Aerial Map). All existing structures were constructed between 1950 and 2010 and have been used to manufacture silica and carbon based products since construction.
Figure 1: Aerial Map
The project site has a land use designation of General Industrial and a corresponding zoning of General Industrial (M-2), as shown in Figure 2. The site is bounded by the same land use and zoning designation in all directions. Adjacent land uses include a metal fabricator and furniture manufacturer, located immediately west of the site, a small parts manufacturing facility is located north of the site and beyond West 135th Street, fabrication shop to the east and a similar manufacturing facility of carbon-based products for aerospace and commercial applications continues to operator on the properties to the south (Table 1- Surrounding Uses)
RESO NO. PC 4-23
March 21, 2023
Figure 2: Zoning Map
RESO NO. PC 4-23
March 21, 2023
Table 1 – Surrounding Uses
PROJECT DESCRIPTION
The applicant is proposing to demolish all existing buildings, structures, parking lots and associated improvements to construct a new 190,860 square foot (-sf) industrial building consisting of 180,860-sf for industrial uses and 10,000-sf for office use. The applicant is proposing to construct a shell industrial building which has been designed to accommodate up to two tenants for a variety of uses including light assembly, manufacturing, and warehousing. As the property is located in the M-2 zone, use of the building for light assembly and manufacturing are allowed by-right under the Gardena Municipal Code (GMC). However, the building has also been designed with large unobstructed spaces that will accommodate warehousing. In accordance with GMC Section 18.46.030.C.18, warehouses in the M-1 and M-2 zones are subject to a conditional use permit. Therefore, the applicant is requesting approval of a conditional use permit and has designed the project plans to meet those requirements for warehousing, and all other applicable provisions for the M-2 zone.
Additionally, pursuant to GMC Section 18.44.010.A, whenever a conditional use permit for a development project is being sought, a site plan review shall be processed concurrently. Therefore, a site plan was prepared to show all the uses proposed with full dimensions of all buildings, building heights, spaces between buildings, off-street parking and loading spaces, points of ingress and egress, fences, and landscaping features.
The proposed structure is of modern design with concrete panel elements to be used as accents and multi-colored paint compositions to break down the scale of the concrete tilt up walls. The project will introduce 20,289-sf of new landscaping including ten-foot landscape planters along the front property line. All parking areas, walkways, and driveways will have proper outdoor lighting that will be cast downward and will be shrouded to prevent glare.
Vehicular access to the site is provided by two 45-foot wide driveways on West 135th Street. Parking is proposed to be located in surface parking lots on the north side of the Zoning
Designation
General Plan Land Use
Designation Existing Land Use
Project Site M-2 Industrial Manufacturing
North M-1/M-2 Industrial Manufacturing
South M-1 Industrial Manufacturing
East M-2 Industrial Machine Shop
West M-2 Industrial Metal Fabricator
RESO NO. PC 4-23
March 21, 2023
proposed building fronting West 135th Street with additional stalls available to the rear of the property.
To allow for the construction of the 190,860-sf industrial building for warehouse use, the applicant is seeking approval of the following entitlements:
1. Conditional Use Permit (CUP #7-21) – To permit the operations of a warehouse facility in the General Industrial (M-2) zone in accordance with Section
18.46.030.C.18 of the Gardena Municipal Code; and
2. Site Plan Review (SPR #9-21) – Demolition of all existing on-site buildings to construct a new 190,860 square foot tilt-up industrial building, with 22 dock doors, a new parking area, lighting, and landscaping site improvements; and
3. Environmental Assessment (EA #18-21) – Adoption of a Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP).
RESO NO. PC 4-23
March 21, 2023
Figure 3: Site Plan
ANALYSIS
CONDITIONAL USE PERMIT #7-21
In order to grant a conditional use permit for warehousing at the 1600 and 1606 W. 135th Street, the Planning Commission must make the following findings pursuant to GMC Section 18.46.040.F for the proposed use of a warehouse:
1. That the use if one for which a conditional use permit is authorized; RESO NO. PC 4-23
March 21, 2023
In accordance with GMC Section 18.46.030.C.18, warehouses in the M-1 and M2 zones are subject to a conditional use permit. Pursuant to GMC Section
18.04.476, warehouse means a building where goods or products are stored, whether on a short-term or long-term basis. This classification does not include self-storage facilities but does include the storage of products for wholesale distribution. The applicant’s proposal for a new industrial building is designed to accommodate a variety of uses including warehousing.
2. That such use is necessary or desirable for the development of the community and is compatible with the surrounding uses; is in harmony with the general plan; is not detrimental to the surrounding properties, existing uses or to uses specifically permitted in the zone in which the proposed use is to be located; and will not be detrimental to the public health, safety or welfare;
The building has been designed to accommodate up to two tenants for a variety of uses that will allow all activities to be contained within the enclosed structure and loading areas that are oriented away from the public rights-of-way. The site is located in a predominantly industrial area. Surrounding uses include manufacturing and other similar warehouse facilities. The project will be an improvement to the property as it will remove buildings that are 74 years old and replace them with a new 190,860-square foot tilt-up concrete industrial building.
The project will not be detrimental to the public health, safety or welfare. As shown in Tables 4a-4f, the project will be compatible with various goals and policies of the City’s Land Use Plan, Economic Development Plan, Community Design Plan, Circulation Plan, Conservation Plan, Public Safety Plan, and Noise Plan.
3. That the site for the intended use is adequate in size and shape to accommodate such use and all of the yards, setbacks, walls, fences, landscaping and other features required in order to adjust such use to those existing or permitted future uses on land in the neighborhood; The property has a dimension of 620 feet in depth and 600 feet in width. As shown in the analysis of the site plan further in the report, the project meets or exceeds all of the minimum development standards of the M-1 zone, including setbacks, walls, fencing, landscaping, and parking. Additionally, the project will meet all the requirements for a warehouse use set forth in GMC Section 18.46.030.C.18.
4. That the site for the proposed use relates to streets and highways properly designed and improved so as to carry the type and quantity of traffic generated or to be generated by the proposed use; and
RESO NO. PC 4-23
March 21, 2023
The Circulation Plan of the Gardena General Plan designates West 135th Street as a major collector roadway. Major collector roadways are intended to serve as an intermediate route to carry traffic between collector roadways and arterial roadways. Major collector roadways are designed to carry moderate levels of traffic, with an average right‐of‐way width of 80 feet, generally in the range of 15,000 to 25,000 vehicles per day. The use of the property for light assembly, manufacturing, and warehousing is not expected to generate more traffic than the existing uses, and therefore, the surrounding streets are properly designed to carry the quantity of traffic generated by the proposed use.
5. That the conditions stated in the decision are deemed necessary to protect the public health, safety and general welfare.
The conditions of approval for Conditional Use Permit #7-21, will ensure that the warehouse use will be compatible with, and not detrimental to, the surrounding uses in the vicinity.
In addition to the above findings, pursuant to GMC Section 18.46.030.C.18, the following requirements apply to all warehouse uses in the manufacturing zones:
1. Loading and unloading. Loading and unloading activities shall take place in areas designed and permanently designated solely for such purpose; a. Loading spaces shall be designed so as to permit vehicular and truck traffic to move into and out of the loading spaces without backing into or upon a street;
The proposed loading and unloading areas are located along the south end of the building and oriented away from public view. There are 22 loading docks and two overhead bay doors with concrete ramps. Each loading spaces is designed to allow vehicular and truck traffic to move into and out of the loading spaces without the backing of any truck into or upon parking spaces. Each loading dock space has a dimension of approximately 13-feet in width and at least 40-feet in length and are cleared to the sky. The loading area has a backup clearance of approximately 83 feet. There is no loading space that backs into or upon a public street or alley. b. Truck loading areas shall be screened from public view by an eightfoot-high wall, accessory structures, or landscaping and foliage so arranged as to conceal the loading facility;
The proposed loading and unloading areas are located along the south end of the building and not visible from public view.
RESO NO. PC 4-23
March 21, 2023
2. Setbacks. Landscape setbacks of at least ten feet shall be required along all street frontages, except alleys;
Ten-foot landscape planters will be located along the front property line that will include 15-gallon and 24-inch box trees along with various ground covering, plants, and shrubbery.
3. Fencing. Barbed wire shall not be used in areas visible to the public; The applicant’s proposal does not include the use of barbed wire. Further, a condition has been added to prohibit barbed wire to be used in areas visible from the public right-of-way.
4. Driveways. Driveways must be at least forty-five feet wide; The project includes two driveways along West 135th Street that each have a width of 45 feet.
5. Parking. Customer parking must be separate from truck parking and loading areas;
The applicant is proposing 82 parking stalls, including eight accessible stalls, along the north side of the proposed building which fronts West 135th Street. This area is intended for customer parking and has access to the building entrances on the northeast and northwest corners of the building. Additional parking is available in the rear of the property which is intended for employees. The loading area is located on the south side of the property and is separated from customer parking.
6. Applicant shall be required to pay an annual service impact fee to be imposed in accordance with the Mitigation Fee Act (Government Code Section 66000 et seq.);
The Gardena Municipal Code needs to be amended as to this provision. Mitigation fees are not imposed on an annual basis. The applicant has agreed to pay a onetime fee in the amount of $100,245.60 for its pro rata share of rehabilitation of W. 135th Street from Western to Normandie Avenues. A condition has been added to this effect.
SITE PLAN REVIEW #9-21
In accordance with GMC Section 18.44.010.A, site plan review is required when a conditional use permit or other discretionary permit is being sought. Site plan review approval requires the following findings to be made:
RESO NO. PC 4-23
March 21, 2023
(1) The physical location, size, massing, setbacks, pedestrian orientation, and placement of proposed structure on the site and the location of proposed uses within the project are consistent with applicable standards. (2) The development is consistent with the intent and purpose of the general plan and provisions of the municipal code, and
(3) The health and safety services (police and fire) and public infrastructure are sufficient to accommodate the new development; and
(4) The project is compatible with the surrounding sites and neighborhoods; and (5) The project has been determined to be exempt from the California Environmental Quality Act or the appropriate environmental document has been completed and required findings have been made.
The following analysis is presented to describe the proposed project, as shown the architectural plans dated November 8, 2021 (Exhibit D of Resolution No. PC 4-23) and any anticipated effects it may have on other properties in the vicinity and the city as a whole.
The subject property is located in the M-2 zone. In accordance with Chapter 18.38, all regulations of the M-2 zone are identical to those of the M-1 zone. The proposed structure complies with the development standards set forth in GMC Chapter 18.36 (Table 2- Development Standards).
Table 2 – Development Standards
Development
Standard
M-2 Zone
Requirement
Project
Proposal
Project
Compliant?
Maximum Floor Area Ratio
(FAR) – Maximum
1.0 0.52 Yes
Building Height –
Maximum
65 ft 42 ft Yes
Minimum Setbacks -
Minimum
Front
Side
Rear
10 ft
None
None
84 ft
41 ft
121 ft
Yes
Yes
Yes
Landscaping - Minimum
Street frontage
5% of parking area
First 10 ft
8,882-sf
First 10 ft
20,289-sf
Yes
Yes
Height of Walls/Fencing -
Maximum 8 ft 8 ft Yes
RESO NO. PC 4-23
March 21, 2023
Development
Standard
M-2 Zone
Requirement
Project
Proposal
Project
Compliant?
Parking – Minimum
1 space/1,000-sf
1 space/300-sf
33 spaces
181 spaces
220 spaces Yes
A total of 220 parking spaces are provided, which meets the required amount of parking spaces for 190,860-sf of warehouse and 10,000-sf of office use. As mentioned, the proposed building is designed to accommodate up to two tenants for a variety of uses including light assembly, manufacturing, and warehousing. As shown above, the parking ratio for warehouse uses is 1 space per 1,000-sf of warehouse area 1 space per 300-sf of office. However, parking for manufacturing uses is based on a rate of 1 space per 750-sf of manufacturing area. As shown below, the project will allow for flexibility in use for up to 19,500-sf of manufacturing uses. A condition has been added to ensure that parking requirements continue to be met.
Table 3 – Alternative Uses Parking Requirements
Minimum Parking
Requirement
M-2 Zone
Requirement
Project
Proposal
Project
Compliant?
Warehouse (161,360-sf)
1 space/1,000-sf 161 spaces
Manufacturing (19,500-sf)
1 space/750-sf 26 spaces
Office (10,000-sf)
1 space/300-sf 33 spaces
TOTAL 220 spaces 220 spaces Yes
As shown, the project meets or exceeds all of the minimum development standards of the M-2 zone, therefore, the physical location, size, massing, setbacks, pedestrian orientation, and placement of proposed structure on the site and the location of proposed uses within the project are consistent with applicable standards.
The General Plan Land Use Plan designates the subject property as Industrial. Allowing the warehouse use would be consistent with various goals and policies of the General Plan including the following:
RESO NO. PC 4-23
March 21, 2023
Table 4 – General Plan Consistency
Table 4a – Land Use
LU Goal 2 Develop and preserve high quality commercial centers and clean industrial uses that benefit the City’s tax base, create jobs and provide a full range of services to the residents and businesses.
LU 2.1: Require ample landscaping and
high level maintenance in all new and
existing commercial and industrial
developments.
The project will introduce 20,289-sf of new
landscaping including ten-foot landscape
planters along the front property line.
Further landscaping will run along the
drive-aisles located on the west and east
sides of the property.
LU Goal 3 Provide high quality, attractive and well-maintained commercial, industrial, and public environments that enhance the image and vitality of the City.
LU 3.1: Require adequate off-street
parking, internal circulation and loading
spaces for commercial developments.
220 parking spaces are proposed to be
located in surface parking lots on the north
side of the proposed building fronting West
135th Street and to the rear of the
property. There are two drive aisles along
the west and east sides of the property that
will provide proper internal circulation.
LU 3.5: Promote the development and
preservation of attractive commercial and
industrial development with ample
landscape treatment, adequate parking
and the full range of customer amenities.
The project will demolish all existing
industrial buildings that were constructed
between 1950 and 2010. The existing
conditions of the property had inadequate
parking supply and little landscaping
through the property. The applicant is
proposing to meet all minimum
development standards including parking
and landscaping.
LU 3.7: Require the mitigation or
remediation of potential hazardous
conditions in the City.
The site has historically impacted
groundwater. As a condition, the applicant
shall prepare and implement a Remedial
Action Plan to the Los Angeles Regional
Water Quality Control Board.
LU 3.9: Require loading and unloading of
materials to be conducted completely on
There are 22 loading docks proposed at
the south side of the building which is
RESO NO. PC 4-23
March 21, 2023
private property and out of sight from a
public street.
completely on private property and out of
sight from a public street.
LU 3.10: Ensure new development
provides adequate improvements,
dedications, and fees to the City to fully
cover the cost of the City services and
facilities.
As a condition of approval, the applicant
will be required to replace the sidewalk in
front of the project site.
Table 4b – Economic Development Plan
ED Goal 1 Promote a growing and diverse business community that provides jobs, goods and services for the local and regional market, and maintains a sound tax base for the City.
ED 1.7: Encourage diversification of
businesses to support the local economy
and provide a stable revenue stream.
The project will bring in a new industrial
business into the area that will support
the local economy and will contribute to
the city’s revenue stream.
Table 4c – Community Design Plan
DS Goal 5 Improve the aesthetic quality of the industrial environment for both workers and residents of the City.
DS 5.1: Industrial projects should be
designed to convey visual interest and a
positive image.
The project will introduce new landscape
along the street frontage that will include
various trees and plants that will assist in
the establishing a positive image to not
only the subject site but to the
surrounding neighborhood. The building
includes vertical changes in materials and
colors in order to convey visual interest to
the site.
DS 5.2: Encourage the design of
industrial buildings to consider the visual
and physical relationship to adjacent
uses. An industrial structure, which
dominates the surrounding environment
by its relative size, shall be discouraged.
The proposed structure is of modern
design with concrete panel elements to
be used as accents and multi-colored
paint compositions to break down the
scale of the concrete tilt up walls.
DS 5.3: Industrial projects shall be
required to: incorporate landscape
setbacks and buffers; aesthetically treat
The project will introduce 20,289-sf of
new landscaping including ten-foot
RESO NO. PC 4-23
March 21, 2023
horizontal and vertical design elements
on building and perimeter walls; and
conceal storage yards, parking, and
service areas to minimize visual impacts
on the public.
landscape planters along the front
property line.
DS 5.4: Long, blank walls should be
broken up with vertical and horizontal
façade articulation achieved through
stamping, colors, materials, modulation
and landscaping.
The structure has a height of 42 feet and
that includes two-story lanterns of glass
that accentuate the office corners of the
facility creating solid and void in the
massing of the 42-foot-tall facilities.
Table 4d – Conservation Plan
CN Goal 2 Conserve and protect groundwater supply and water resources.
CN 2.2: Comply with the water
conservation measures set forth by the
California Department of Water
Resources.
The project will be conditioned to ensure
that the landscape and irrigation plans
comply with the State’s Water Efficient
Landscape Guidelines, as adopted by the
Gardena Municipal Code.
CN Goal 3 Reduce the amount of solid waste produced in Gardena.
CN 3.1: Comply with the requirements set
forth in the City’s Source Reduction and
Recycling Element.
The Applicant will be required to prepare
construction and demolition waste
recycling plans for review and approval by
the Building Division. Applicant/developer
shall enroll in the city’s waste diversion
program.
CN Goal 4 Conserve energy resources through the use of technology and conservation methods.
CN 4.2: Require compliance with Title 24
regulations to conserve energy.
The project will be conditioned to comply
with the current California Building Code,
which includes the CalGreen Code.
RESO NO. PC 4-23
March 21, 2023
Table 4e – Public Safety Plan
PS Goal 2 Protect the community from dangers associated with geologic instability, seismic hazards and other natural hazards.
PS 2.3: Require compliance with seismic
safety standards in the Unified Building
Code.
The project will be conditioned to comply with
the California Building Code relating to seismic
safety.
PS 2.4: Require geotechnical studies for all
new development projects located in an
Alquist-Priolo Earthquake Fault Zone or
areas subject to liquefaction.
The applicant is required to submit and comply
with a Geotechnical investigation.
Table 4f – Noise Plan
N Goal 3 Develop measures to control non-transportation noise impacts.
N 3.1: Require compliance with a
quantitative noise ordinance based on the
Model Noise Ordinance developed by the
(now-defunct) State of California Office of
Noise Control.
The project will be conditioned to show
compliance with interior and exterior noise
standards.
N 3.3: Require compliance with construction
hours to minimize the impacts of
construction noise on adjacent land.
The project will be conditioned to comply with
the City’s hours of construction. Additionally,
the project is conditioned on implementing
noise reduction methods.
In addition to all other applicable zoning and development requirements and policies, the following factors shall also be considered by the Planning Commission in determining whether the site plan shall be approved:
1. The dimensions, shape and orientation of the parcel.
The property is an 8.46-acre square shaped lot with approximately 620 feet in depth and 600 feet in width. The project requires a lot line adjustment of two parcels to combine them into one, which has been included as a condition of approval.
2. The placement of buildings and structures on the parcel.
The applicant is proposing to construct one warehouse building designed to accommodate two tenant spaces. The building is designed to be in the center of the property with parking and landscape within the first 84 feet of the property and RESO NO. PC 4-23
March 21, 2023
truck dock doors and additional parking in the rear that is accessible by two drive aisles along the west and east sides of the property.
3. The height, setbacks, bulk and building materials.
The structure has a height of 42 feet and that includes two-story lanterns of glass that accentuate the office corners of the facility creating solid and void in the massing of the 42-foot-tall facilities. Concrete panel elements are proposed to be used as accents and multi-colored paint compositions to break down the scale of the concrete tilt up walls.
4. The distance between buildings or structures.
The applicant’s proposal includes one warehouse building. The only other proposed structure on the lot is a trash enclosure located at the southwest corner of the lot, approximately 120 feet away from the main structure.
5. The location, number and layout of off-street parking and loading spaces.
Parking is proposed to be located in surface parking lots on the north side of the proposed building fronting West 135th Street with additional stalls available in the rear of the property. There are 22 loading docks and two overhead bay doors with concrete ramps on the south side of the building, away from public view.
6. The internal vehicular patterns and pedestrian safety features.
The circulation for the proposed project has been designed to ensure efficient movement of cars and trucks throughout the project site. The subject site currently has six different driveways along West 135th street. The applicant is proposing to replace those with two 45-feet wide driveways on the west and east ends of the property frontage. As mentioned, customer parking is located to the north side of the property with access to the building on the west and east corners of the building. Employee parking is designed to be located on the south end of the property. All walkways and common areas will be properly lit.
7. The location, amount and nature of landscaping.
The new landscaping will have various tree species and shrubs with plant species that are consistent with the surrounding area and will meet drought tolerant requirements. The landscaping includes a mix of 15-gallon and 24-inch box with Chinese Pistache and Yew Pine trees along the street frontage and Crape Myrtle and Brisban Box trees along the building front. Further landscaping will run along the drive-aisles located on the west and east sides of the property.
8. The placement, height and direction of illumination of light standards.
RESO NO. PC 4-23
March 21, 2023
The proposed project is required to comply with the City’s requirements for outdoor lighting, which is an average of two footcandles with no single point less than one footcandle for all public/common areas. The project’s lighting plan includes night lighting for parking areas, walkways, and driveways. Outdoor lights will be cast downward and would be shrouded to prevent glare.
9. The location, number, size and height of signs.
All signs are conditioned to meet the requirements of GMC Chapter 18.58.
10. The location, height and materials of walls, fences or hedges.
The site currently has a nonconforming eight-foot high wrought iron fence that abuts the public right-of-way. The applicant is proposing to remove the nonconforming fencing and install a eight-foot high wrought iron fence along the side and rear property lines. Two eight-foot high metal swinging vehicular gates will be located on each aide of the building and provide access to the loading dock area and designated employee parking spaces.
11. The location and method of screening refuse and storage areas, roof equipment, pipes, vents, utility equipment and all equipment not contained in the main buildings of the development.
The project includes a trash enclosure at the southwest corner of the property, with a roof and metal gate that is out of view from public rights-of way. The project has been conditioned to require any equipment, whether on the roof, side of building, or ground to be concealed from public view.
12. For residential developments, the above factors shall be considered satisfied if the project meets the objective criteria relating to those items set forth in the zone and the applicable general provisions, including residential design criteria, contained in Chapter 18.42.
The project does not include the development for residential uses.
13. For non-residential development, such other information which the community development director or commission may require to make the necessary finding that the provisions of this code are being complied with. • Police protection services in the City are provided by the Gardena Police Department (PD). Gardena PD operates out of the Civic Center located 1718 West 162 Street, which is located roughly 1.7 miles south of the project site. The project site is already within the PD service area, and once operational, the project would continue to be served by the PD. Fire protection and emergency medical response services in the City are provided by the Los Angeles County Fire Department (LACFD). The project site is served by Fire Station No. 159: 2030 West 135th Street, which is located approximately 0.59 miles west of the site. The project site is already RESO NO. PC 4-23
March 21, 2023
within the LACFD service area, and once operational, would continue to be served by LACFD. Therefore, the city’s current health and safety services and public infrastructure are sufficient to accommodate the new development.
• As mentioned above, the site is bounded by the same land use and zoning designation in all directions and adjacent land uses include other industrial establishments such as manufacturers and fabrication shop. Therefore, the project is compatible with the surrounding sites and neighborhoods. • As shown below the appropriate environmental document has been completed and required findings have been made.
Subject to the approval of the site plan review and the issuance of the conditions of approval, the proposed use will be consistent with the General Plan and Gardena Municipal Code, compatible with the surrounding area, and will not be detrimental to the public health, safety, or welfare.
ENVIRONMENTAL CONSIDERATIONS
Harris and Associates prepared an Initial Study (IS)/Mitigated Negative Declaration (MND), and Mitigation Monitoring and Reporting Program (MMRP) under contract to the City. The IS/MND was prepared and noticed in accordance with all requirements of the California Environmental Quality Act (Public Resources Code § 21000 et seq.) and the CEQA Guidelines (14 Cal. Code of Regs. § 15000 et seq.) (collectively, “CEQA”). The IS/MND was subject to a 30-day public review period of October 13, 2022, to November 14, 2022. Additionally, an extension of time to respond was given to the Los Angeles Regional Water Quality Control Board. During the public review period five comment letters were submitted to the City, and an additional comment letter was received on November 30, 2022, from the Los Angeles Regional Water Quality Control Board. All comments, including staff’s responses have been included in the document entitled Response to Comments (Exhibit B to Resolution No. PC 4-23) and the changes have been incorporated into the Final IS/MND (Exhibit A to Resolution No. PC 4-23). The Final IS/MND includes an additional change to Mitigation Measure HAZ-1 as discussed further below (Exhibit F to Resolution No. PC 4-23).
The IS/MND determined that there were no impacts or a less than significant impacts with regard to a number of topics. The IS/MND identified the below topic areas as potentially significant, but can be mitigated below a level of significance:
• Under Geology and Soils resources, the project has the potential for significant impacts relating to soil instability and expansive soil. These potential impacts will be mitigated by Mitigation Measure GEO-1 which requires that grading plans be RESO NO. PC 4-23
March 21, 2023
prepared in conformance with the recommendations in the Geotechnical Report for the project.
• Under Geology and Soils, the Project has the potential for significant impacts relating to soil instability and expansive soil. These potential impacts will be mitigated by Mitigation Measure GEO-1 which requires that grading plans be prepared in conformance with the recommendations in the Geotechnical Report for the project.
• Under Hazards and Hazardous Materials, the project has the potential for significant impacts due to the release of hazardous materials into the environment and being located on a hazardous materials site. Potential impacts under these topics will be mitigated by HAZ-1 which requires a remedial program to be reviewed and approved by the Los Angeles Regional Water Quality Control Board (RWQCB). Minor changes were made for clarification purposes after comments were received by the RWQCB and further consultation with the applicant and the RWQCB. The RWQCB has approved the language of the final mitigation measure in a phone call with staff. This change is a minor technical clarification and does not represent a substitution of the original mitigation measure. • Under Tribal Cultural Resources, the Project has the potential for adverse changes to tribal cultural resources. Potential impacts will be mitigated by TCR-1 through TCR-3. TCR-1 requires the Developer to retain a Native American Monitor to be on-site for ground-disturbing activities. If any tribal cultural resources are found, construction activities will cease until the find is evaluated. TCR-2 provides that the requirements of state law shall be followed if there is any discovery of human remains and associated funerary objects; construction activities must also cease until it is determined by the Tribal Monitor that resuming activities is acceptable.
TCR-3 sets forth procedures to be followed for burials and funerary remains.
These same mitigation measures would also reduce any cumulative impacts in this area to below a level of significance.
The Mitigation Measures are set forth in the Mitigation Monitoring and Reporting Program. (Exhibit C to Resolution No. PC 4-23).
No other impact areas require mitigation as the impacts would be less than significant.
Additionally, the lot line adjustment, which is a condition of approval, does not create any additional environmental impacts that were not examined as part of the overall project The Initial Study was prepared to determine whether implementation of the project may cause significant adverse environmental impacts. On the basis of this evaluation, it was found that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case, because mitigation measures were added to the project.
The IS/MND was independently reviewed by City staff. In making all of the required findings, the Planning Commission will exercise its independent judgment and analysis.
RESO NO. PC 4-23
March 21, 2023
NOTICING
The public hearing notice for the project was published in the Gardena Valley News and mailed first class to owners and occupants within a 300-foot radius of the site on February 9, 2023, for the February 21, 2023, Planning Commission meeting. On February 21, 2023, the public hearing was opened for the project and the Planning Commission continued the item to the March 7, 2023, meeting. At the March 7, 2023 meeting, the public hearing was continued to the March 21st meeting. A copy of Proof of Publication and Affidavit of Mailing are on file in the office of the Community Development Department, Room 101, City Hall, and are considered part of the administrative record.
RECOMMENDATION
Staff recommends the Planning and Environmental Quality Commission to:
1) Continue the public hearing;
2) Receive testimony from the public; and
3) Adopt Resolution PC 4-23 approving, Conditional Use Permit #7-21 and Site Plan Review #9-21and subject to the attached conditions of approval and adopts the Mitigated Negative Declaration and Mitigation Monitoring Program.
ATTACHMENTS
Resolution No. PC 4-23
Exhibit A – Final IS/MND dated March 2023
Exhibit B – Response to Comments dated February 2023
Exhibit C – Mitigation Monitoring and Reporting Program Exhibit D – Architectural Plans, dated November 8, 2021 Exhibit E – Conditions of Approval
Exhibit F – Technical Memo dated March 16, 2023
MARCH 21, 2023
PLANNING & ENVIRONMENTAL QUALITY
COMMISSION
ENVIRONMENTAL ASSESSMENT #18-21
CONDITIONAL USE PERMIT #7-21
SITE PLAN REVIEW #9-21
Vicinity
Map
1600 & 1606 W 135th Street
N
LOCATION
Zoning Map
Demolish all existing on-site structures, 18 existing buildings, which consisted of 23 bay doors
190,860 gross square foot (-sf), 42-foot-high industrial building. 180,860-sf open area for industrial use with 22 dock doors 10,000-sf Office
Site Improvements
New landscaping along street frontage
Proper outdoor lighting
New repaved parking areas, 220 spaces
Vehicular access to the site is provided by two 45-foot wide driveway Project Description
Entitlements Requested
1) Conditional Use Permit (CUP #7-21) – To permit the operations of a warehouse facility in the General Industrial (M-2) zone in accordance with Section
18.46.030.C.18 of the Gardena Municipal Code.
2) Site Plan Review (SPR #9-21) – Demolition of all existing on-site buildings to construct a new 190,860 square foot tilt-up industrial building, with 22 dock doors, a new parking area, lighting, and landscaping site improvements; 3) Environmental Assessment (EA #18-21) – Adoption of a Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP).;
Elevations/Colors and Materials
Conditional Use Permit
1. Conditional Use Permit (CUP #7-21) – To permit
the operations of a warehouse facility in the General
Industrial (M-2) zone in accordance with Section
18.46.030.C.18 of the Gardena Municipal Code
Conditional Use Permit
Warehouse uses are subject to specific provisions in
set forth in GMC Section 18.46.40.F
• Loading and unloading. Loading and unloading activities shall take place in areas designed and permanently designated solely for such purpose.
• Setbacks. Landscape setbacks of at least ten feet shall be required along all street frontages, except alleys
• Fencing. Barbed wire shall not be used in areas visible to the public Conditional Use Permit
Warehouse uses are subject to specific provisions in
set forth in GMC Section 18.46.40.F
• Driveways. Driveways must be at least forty-five feet wide • Parking. Customer parking must be separate from truck parking and loading areas
• Applicant shall be required to pay an annual service impact fee to be imposed in accordance with the Mitigation Fee Act (Government Code Section 66000 et seq.)
Site Plan Review – Analysis
GMC Section 18.44.010.a, site plan review is required when a conditional use permit or other discretionary permit is being sought
Findings:
• The physical location, size, massing, setbacks, pedestrian orientation, and placement of proposed structure on the site and the location of proposed uses within the project are consistent with applicable standards. • The development is consistent with the intent and purpose of the general plan and provisions of the municipal code, and
• The health and safety services (police and fire) and public infrastructure are sufficient to accommodate the new development; and
• The project is compatible with the surrounding sites and neighborhoods; and Site Plan Review – Analysis
GMC Section 18.44.010.a, site plan review is required when a conditional use permit or other discretionary permit is being sought
Findings:
• The project has been determined to be exempt from the California Environmental Quality Act or the appropriate environmental document has been completed and required findings have been made.
• De Novo Planning Group prepared an Initial Study, Mitigated Negative Declaration (MND), and Mitigation Monitoring and Reporting Program (MMRP) under contract to the City
• Initial Study was available for public review from October 13, 2022, to November 14, 2022. Extension to Water Board.
• The IS/MND determined that there were potentially significant impacts with regard to the following:
• Geology and Soils resources,
• Hazards and Hazardous Materials,
• Tribal Cultural Resources.
Mitigated below a level of significance - Mitigation Monitoring and Reporting Program
Environmental Considerations
• Public hearing notices were advertised in the Gardena Valley News and mailed to owners and occupants within a 300-foot radius of the project site on February 21, 2023.
On March 7, 2023, and March 23, 2023, the hearing was
continued.
• No Public Comments received.
Public Noticing
STAFF RECOMMENDATION
Receive testimony from the public; and
Adopt Resolution PC 4-23 approving, Conditional Use
Permit #7-21 and Site Plan Review #9-21, and adopts
the Mitigated Negative Declaration and Mitigation
Monitoring Program
Resolution No. PC 10-22
M
1600 W 135th Street, Gardena CA
Overview
• 8.46 acres of M2 Zoning
• Existing tenant, Avcorp, has elected to close its operations and vacate the property. Current lease expires on March 31, 2023
• Older, functionally obsolete mix of 18 buildings to be replaced with modern, state of the art, class A industrial building of 190,860 square feet
135th Street
Project Tabulation
Net Site Area 8.46 Acres
Building SF (Incl. 5,000 second floor office) 190,860
Auto Parking Provided (Min. 214, Max. 220 ) 220 Stalls (1.15 per 1,000 SF) Landscape 20,289 SF (5.5%)
Building Height 42’
Project Design
• Noteworthy design elements
• High image architectural design suitable for corporate headquarters • Landscape enhancements
• Functional ingress and egress
• Screening of loading areas
• Ability to increase parking for higher employment uses • Customer parking separate from truck parking and loading areas • New street improvements including sidewalks, driveways, landscaping and curb/gutters
• Divisible to two tenants
Current 135th Street Frontage
Proposed 135th Street Frontage
Elevations
Sustainability
• Expandable power for manufacturing or value-add occupiers • EV chargers installed day 1, plus conduits for additional future stalls • Conduits for future EV truck charging
• Solar Ready roof
• Drought tolerant landscaping
• Excess bicycle parking
• High quality insulation
• High performance windows and doors
• 2.5% Skylights to reduce daytime lighting use
• Recycled concrete and asphalt materials from former structures to be reused onsite • Trees for shading of parking per city requirements, focusing on street frontage
• Full concrete paving for heat island reduction
OMP Case Study: 1720 W 135th, Gardena
• 101,890 SF industrial building built by OMP in 2017
• Leased long term to Airfayre, providing in flight catering manufacturer providing significant employment
OMP Case Study: 12901 Western Ave, Gardena
• 40,511 SF industrial building built by OMP in 2018
• Sold to Genexus, a leading apparel company as its corporate headquarters
Project Benefits
• New high quality jobs expected to
generate millions of dollars in
annual salaries and wages
• Redevelopment opportunity to
demo functionally obsolete
buildings to address current market
needs
• New construction jobs
• Additional fee revenue for the City of
other agencies
• Expansion opportunities for a new or
existing companies in Gardena
• Support for Gardena retail and
restaurants
• Local hiring and supplier
opportunities for businesses and
residents in the City of Gardena
The project will provide numerous benefits to the residents and City of Gardena.
Some examples of the benefits include:
Thank You
1 RESOLUTION NO. 6626
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF GARDENA, CALIFORNIA, APPROVING A MITIGATED
NEGATIVE DECLARATION AND A CONDITIONAL USE
PERMIT AND SITE PLAN FOR A 190,860 SQUARE FOOT
WAREHOUSE BUILDING LOCATED AT 1600 W. 135TH
STREET
WHEREAS, on December 2, 2021, Gardena Owner LP (“Developer”), owner of the 296,630 square foot parcel located at 1600 W. 135th Street (the “Property”), filed an application for development of a 190,860 square foot warehouse building that would include 10,000 square feet of office space; and
WHEREAS, the Property has a land use designation of General Industrial and a corresponding zoning of General Industrial (M-2);
WHEREAS, development of the Project requires approval of a lot line adjustment of two parcels to combine them into one, a conditional use permit (“CUP”) for the warehouse use, and a site plan for the warehouse (the “Project”); and WHEREAS, the lot line adjustment shall be approved by the Community Development Director; and
WHEREAS, on March 22, 2022, the City entered into a consultant agreement with Harris & Associates (“Consultant”) to prepare the required environmental documentation for the project; and
WHEREAS, the City, through Consultant, prepared an Initial Study/Mitigated Negative Declaration for the Project; and
WHEREAS, on March 7, 2023 the Planning Commission opened and continued the public hearing to March 21, 2023; and
WHEREAS, on March 21, 2023 held the public hearing at which time it considered all evidence presented, both written and oral after which it adopted Resolution No. PC 4-23 approving the mitigated negative declaration, conditional use permit and site plan review; and
WHEREAS, On March 28, 2023, Councilmember Love called for review of the project, which was seconded may Mayor Pro Tem Francis; and WHEREAS, on April 13, 2023, a public hearing was duly noticed for the City Council meeting of April 25, 2023, at which time it held a public hearing; and WHEREAS, in making the various findings set forth herein, the City Council has considered all of the evidence presented by staff, the applicant, and the public, whether written or oral, and has considered the procedures and the standards required by the DocuSign Envelope ID: 390477DD-DC84-44EA-9500-825A48EDFC01 RESOLUTION NO. 6626
2 Gardena Municipal Code. The record of these proceedings can be found at the Community Development Department, Room 101, 1700 West 162nd Street, Gardena, California. The Director of Community Development is the custodian of such record.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF GARDENA, CALIFORNIA, DOES HEREBY FIND, DETERMINE, AND RESOLVE, AS FOLLOWS:
SECTION 1. CEQA Procedures. The Planning Commission of the City of Gardena does hereby find as follows:
A. Consultant prepared an Initial Study/Mitigated Negative Declaration (hereafter “MND”). A Notice of Intent to adopt the MND was timely distributed and the public review period was from October 13, 2022 to November 14, 2022. This deadline was extended to the end of November 2022 for the California Regional Water Quality Control Board (“RWQCB”) as it was inadvertently left off of the notice list.
B. Prior to the release of the MND and in accordance with AB 52, the City sent notices regarding tribal consultation to the two tribes that had requested such notice. The City engaged in consultation and mitigation measures have been included in the EIR as a result of the consultation.
C. City received public comments on the MND from the Los Angeles Regional Water Quality Control Board (RWQCB), the South Coast Air Quality Management District (SCAQMD), the Los Angeles County Sanitation Districts, the Los Angeles County Fire Department, Supporters Alliance for Environmental Responsibility (“SAFER”), and Golden State Environmental Justice Alliance. Both SAFER and the Environmental Justice Alliance withdrew their comment letters. All other comments were responded to and incorporated into a separate document entitled Response to Comments, dated March 2023, attached hereto as Exhibit B.
D. As a result of the comment received by the RWQCB, minor changes were made to Mitigation Measure HAZ-1 for clarification purposes. The Mitigation Measure now recognizes that the remedial cleanup program for the shallow VOC impacted soils may be through a document other than a Remedial Action Plan (RAP), includes a reference to the document which contains the clean-up standards, and specifies that cleanup shall be to the criterial protective of human health and the environment. Additionally, the Mitigation Measure provides that additional cleanup that may be required for deeper soils and groundwater is not required for mitigation of the project. The RWQCB is an agreement with the revisions to the mitigation measure and a technical memorandum was prepared by the City’s consultant regarding this change (Exhibit F attached hereto).
E. No substantive changes were required to the MND as a result of the DocuSign Envelope ID: 390477DD-DC84-44EA-9500-825A48EDFC01 RESOLUTION NO. 6626
3 comments and recirculation of the document was not required. The changes merely clarify or make insignificant changes in the Draft IS/MND which are incorporated into the Final IS/MND, dated March 2023 (Exhibit A attached hereto).
F. In adopting the MND and adopting the Mitigation Monitoring and Reporting Program (Exhibit C attached hereto), the City Council has exercised its independent judgement and analysis. The MND is an accurate and complete statement of potential environmental impacts of the Project. The City Council has reviewed and considered the MND, agenda reports, written reports, public testimony, and other information in the record.
SECTION 2. CEQA Findings Regarding Impacts.
A. An MND was prepared for the Project as all potential impacts can be mitigated below a level of significance.
B. The MND identifies the below topic areas as potentially significant, but each can be mitigated below a level of significance.
1. Under Geology and Soils, the Project has the potential for significant impacts relating to soil instability and expansive soil. These potential impacts will be mitigated by Mitigation Measure GEO-1 which requires that grading plans be prepared in conformance with the recommendations in the Geotechnical Report for the Project.
2. Under Geology and Soils, the Project has the potential for significant impacts relating to paleontological resources. Potential impacts under this topic will be mitigated by Mitigation Measure GEO-2 which requires a Worker Awareness and Environmental Program training for construction workers as well as Mitigation Measure GEO-3 which work to cease and a professional vertebrate paleontologist to be contacted if fossil bearing deposits are encountered.
3. Under Hazards and Hazardous Materials, the Project has the potential for significant impacts due to the release of hazardous materials into the environment and being located on a hazardous materials site. Potential impacts under these topics will be mitigated by HAZ-1 which requires a remedial cleanup program to be reviewed and approved by the Los Angeles Regional Water Quality Control Board as set forth in the MMRP.
4. Under Tribal Cultural Resources, the Project has the potential for adverse changes to tribal cultural resources. Potential impacts will be mitigated by TCR-1 through TCR-3. TCR-1 requires the Developer to retain a Native American Monitor to be on-site for ground-disturbing activities. If any tribal cultural resources are found, construction activities will cease until the find is evaluated. TCR-2 provides that the requirements of state law shall be followed if there is any discovery of human remains and associated DocuSign Envelope ID: 390477DD-DC84-44EA-9500-825A48EDFC01 RESOLUTION NO. 6626
4 funerary objects; construction activities must also cease until it is determined by the Tribal Monitor that resuming activities is acceptable.
TCR-3 sets forth procedures to be followed for burials and funerary remains. These same mitigation measures would also reduce any cumulative impacts in this area to below a level of significance.
C. The lot line adjustment, which is a condition of approval, does not create any additional environmental impacts that were not examined as part of the overall Project.
SECTION 3. Adoption of MND and MMRP. Based on the above, the City Council hereby adopts the Final and Complete Initial Study/Mitigated Negative Declaration attached hereto as Exhibit A (Final IS/MND) and adopts the Mitigation Monitoring and Reporting Program attached hereto as Exhibit C.
SECTION 4. Conditional Use Permit. Warehouse uses in the M-2 zone require a CUP and conformance with the requirements set forth in Gardena Municipal Code section 18.46.030C.18. (GMC § 18.36.030M.) The City Council hereby approves Conditional Use Permit #7-21 for the warehouse use based on the following findings and subject to the conditions attached hereto as Exhibit E.
A. That the use applied for in one for which a conditional use permit is authorized by Chapter 18.46.
Analysis: The General Industrial (M-2) zone (Chapter 18.38) incorporates all provisions of the M-1 zone (Chapter 18.36). Both Chapter 18.36 and Chapter 18.46 allow for warehouse uses in the M-2 zone pursuant to a CUP.
B. That such use is necessary or desirable for the development of the community and is compatible with the surrounding uses; is in harmony with the general plan; is not detrimental to the surrounding properties, existing uses, or uses specifically permitted in the zone; and will not be detrimental to the public health, safety or welfare.
Analysis: The Project is compatible with the surrounding uses as it is an industrial project being located in an industrial zoned and developed area. As set forth in the staff report, the Project is consistent with the General Plan. The Project will be an improvement to the Property as it will remove buildings that are approximately 73 years old and replace them with a new 190,860 square foot industrial building designed to accommodate a variety of uses including warehousing. The Project will not be detrimental to the public health, safety or welfare.
C. That the site for the intended use is adequate in size and shape to accommodate such use an all of the yards, setbacks, walls, fences, landscaping and other features required.
Analysis: As set forth in the staff report, the site is adequate in size and shape as the Project complies with all required development standards.
DocuSign Envelope ID: 390477DD-DC84-44EA-9500-825A48EDFC01 RESOLUTION NO. 6626
5 D. That the site for the proposed use relates to streets and highways properly designed and improved to carry the type and quantity of traffic to be generated.
Analysis: The Circulation Plan of the Gardena General Plan designates West 135th Street as a major collector roadway. Major collector roadways are intended to serve as an intermediate route to carry traffic between collector roadways and arterial roadways. Major collector roadways are designed to carry moderate levels of traffic, with an average right‐of‐way width of 80 feet, generally in the range of 15,000 to 25,000 vehicles per day. The use of the property for light assembly, manufacturing, and warehousing is not expected to generate more traffic than the existing uses, and therefore, the surrounding streets are properly designed to carry the quantity of traffic generated by the proposed use.
E. That the conditions are necessary to protect the public health, safety and general welfare.
Analysis: The conditions of approval for Conditional Use Permit #7-21, set forth in Exhibit E, will ensure that the warehouse use will be compatible with, and not detrimental to, the surrounding uses in the vicinity.
F. The Project will comply with the requirements set forth in Gardena Municipal Code section 18.46.030C.18.
Analysis: As indicated in the staff report which is incorporated herein by reference, the project complies with all of the additional requirements set forth in the above-referenced section. As the mitigation fee act cannot impose annual service impact fees and one has not been adopted by resolution, the applicant has agreed to pay a one-time fee of $100,245.60 for its pro rata share of rehabilitation of West 135thStreet from Western Avenue to Normandie Avenue due to wear and tear resulting from trucking operations from the warehouse facility. A condition of approval has been added to address the one-time payment.
SECTION 5. Site Plan Review. A site plan review is required under Gardena Municipal Code section 18.44.010 as this Project also requires a CUP. A site plan shall be approved or conditionally approved when the following two findings are made. The City Council hereby approves Site Plan Review # 9-21 dated November 8, 2021, attached hereto as Exhibit D, as presented to the City Council based on the following findings and subject to the conditions attached hereto as Exhibit E.
A. The physical location, size, massing, setbacks, pedestrian orientation, and placement of proposed structure on the site and the location of proposed uses within the Project are consistent with applicable standards.
Analysis: As set forth in the staff report, the physical location, size, massing, setbacks, pedestrian orientation, and placement of structures within the Project and location of the uses are consistent with applicable standards of the Gardena Municipal Code.
DocuSign Envelope ID: 390477DD-DC84-44EA-9500-825A48EDFC01 RESOLUTION NO. 6626
6 B. The development is consistent with the intent and general purpose of the general plan and provisions of the municipal code.
Analysis: The General Plan land use designation is Industrial which is designed for a wide variety of clean and environmentally friendly industries, technologyrelated uses and supporting facilities and business parks. The proposed use replaces 296,630 square feet of building space that was built between 1950 and 2010 and most recently has been occupied by a manufacturing company of aerospace components.
The site is on a list of contaminated sites. Development of the site will require clean-up of the contamination in accordance with a Remedial Action Plan approved by the California Department of Toxic Substances Control (DTSC). The new development that will replace the existing manufacturing facilities will meet the most current building standards and will be more energy efficient, using less gas and fuel than the previous use. Additionally, the Project will result in fewer vehicular trips, reduce GHGs and other pollutants and will improve stormwater control measures.
The Project is consistent with a number of goals and policies of the General Plan as more fully set forth in the staff report, which is incorporated by reference.
As set forth in the staff report which is incorporated by reference, the Project will comply with all development standards of the M-1 zone as well as the development standards of the CUP requirements for warehouse uses.
C. The health and safety services (police and fire) and public infrastructure are sufficient to accommodate the new development.
Analysis: Police protection services in the City are provided by the Gardena Police Department (PD). Gardena PD operates out of the Civic Center located 1718 West 162 Street, which is located roughly 1.7 miles south of the Property. The Property is already within the PD service area, and once operational, the Project would continue to be served by the PD. Fire protection and emergency medical response services in the City are provided by the Los Angeles County Fire Department (LACFD). The Property is served by Fire Station No. 159: 2030 West 135th Street, which is located approximately 0.59 miles west of the site. The Property is already within the LACFD service area, and once operational, would continue to be served by LACFD. Therefore, the city’s current health and safety services and public infrastructure are sufficient to accommodate the new development.
D. The Project is compatible with the surrounding sites and neighborhoods.
Analysis: The Project is located in an area of the City that is zoned for and has been developed for industrial uses. The Project is keeping within the development pattern of the area and will not have any impacts on the general welfare of the City.
E. The Project has been determined to be exempt from the California Environmental Quality Act or the appropriate environmental document has been completed and required findings have been made.
DocuSign Envelope ID: 390477DD-DC84-44EA-9500-825A48EDFC01 RESOLUTION NO. 6626
7 Analysis: As set forth in Section 2 of this resolution, the appropriate environmental document has been completed and required findings have been made.
SECTION 6. That this Resolution shall be effective immediately.
BE IT FURTHER RESOLVED that the City Clerk shall certify to the passage and adoption of this Resolution; shall cause the same to be entered among the original Resolutions of said City; and shall make a minute of the passage and adoption thereof in the records of the proceedings of the City Council of said City in the minutes of the meeting at which the same is passed and adopted.
Passed, approved, and adopted this 25th day of April, 2023.
TASHA CERDA, Mayor
ATTEST:
MINA SEMENZA, City Clerk
APPROVED AS TO FORM:
CARMEN VASQUEZ, City Attorney
DocuSign Envelope ID: 390477DD-DC84-44EA-9500-825A48EDFC01 FINAL
Initial Study/Mitigated Negative
Declaration
Gardena Industrial Center Project
Prepared for:
City of Gardena
1700 West 162nd Street
Gardena, California 90247
Contact: Amanda Acuna, Senior Planner
Prepared by:
22 Executive Park, Suite 200
Irvine, California 92614
(949) 655-3900
Contact: William Halligan, Esq., Senior Director/Senior Environmental Counsel March 2023
This page intentionally left blank.
Gardena Industrial Center Project IS/MND i March 2023
Table of Contents
Acronyms and Abbreviations .................................................................................................. v Document Overview.................................................................................................................ix Section 1 Project Description............................................................................................... 1
1.1 Project Location ............................................................................................. 1
1.2 Environmental Setting .................................................................................... 1
1.2.1 Surrounding Land Uses ............................................................................. 1
1.2.2 Existing General Plan and Zoning............................................................. 2
1.3 Project Description......................................................................................... 2
1.3.1 Proposed Project Description .................................................................... 2
1.3.2 Proposed Project Design........................................................................... 2
1.3.3 Open Space and Landscaping .................................................................. 2
1.3.4 Lighting....................................................................................................... 3
1.3.5 Access, Circulation, and Parking............................................................... 3
1.3.6 Grading and Drainage................................................................................ 3
1.3.7 Demolition and Construction...................................................................... 3
1.3.8 Project Phasing.......................................................................................... 3
1.4 Project Approvals and Permits ....................................................................... 3 Section 2 Initial Study Checklist.........................................................................................23
2.1 Project Information.......................................................................................23
2.2 Environmental Factors Potentially Affected ..................................................25
2.3 Lead Agency Determination .........................................................................26
2.4 Evaluation of Environmental Impacts ...........................................................27
2.4.1 Aesthetics................................................................................................. 28
2.4.2 Agriculture and Forestry Resources ........................................................32
2.4.3 Air Quality................................................................................................. 34
2.4.4 Biological Resources ...............................................................................45
2.4.5 Cultural Resources...................................................................................49
2.4.6 Energy ......................................................................................................52
2.4.7 Geology and Soils....................................................................................56
2.4.8 Greenhouse Gas Emissions....................................................................62
2.4.9 Hazards and Hazardous Materials ..........................................................67
2.4.10 Hydrology and Water Quality...................................................................76
2.4.11 Land Use and Planning............................................................................81
2.4.12 Mineral Resources ...................................................................................82
2.4.13 Noise ........................................................................................................83
2.4.14 Population and Housing...........................................................................89
2.4.15 Public Services.........................................................................................90 Gardena Industrial Center Project IS/MND ii March 2023
2.4.16 Recreation................................................................................................92
2.4.17 Transportation..........................................................................................93
2.4.18 Tribal Cultural Resources ........................................................................97
2.4.19 Utilities and Service Systems.................................................................103
2.4.20 Wildfire....................................................................................................109
2.4.21 Mandatory Findings of Significance.......................................................111 Section 3 List of Preparers ...............................................................................................113
3.1 Lead Agency ..............................................................................................113
3.2 Consultants................................................................................................113 Section 4 References ........................................................................................................115 Figures
Figure 1. Regional Location ........................................................................................................5 Figure 2. Project Site...................................................................................................................7 Figure 3. Previous Recognized Environmental Conditions ..........................................................9 Figure 4. Site Plan ....................................................................................................................11 Figure 5a. Elevations ................................................................................................................13 Figure 5b. Elevations ................................................................................................................15 Figure 6a. Grading Plan............................................................................................................17 Figure 6b. Grading Plan............................................................................................................19 Figure 7. Building Numbers.......................................................................................................21 Tables
Table 1. Anticipated Discretionary Actions/Approvals..................................................................4 Table 2. South Coast Air Quality Management District Air Quality Mass Daily Thresholds........37 Table 3. Source Receptor Area Southwest Coastal Los Angeles County Localized Significance Thresholds ................................................................................................37 Table 4. Estimated Construction Daily Maximum Air Pollutant Emissions (pounds/day)............39 Table 5. Operational Daily Maximum Air Pollutant Emissions ...................................................40 Table 6. Estimated Construction Daily Maximum Air Pollutant Emissions (pounds/day) Relative to Localized Significance Thresholds...............................................................42 Table 7. Existing Energy Use....................................................................................................52 Table 8. Construction Diesel Fuel and Gasoline Use ................................................................53 Table 9. Existing and Project Electricity Use .............................................................................54 Table 10. Existing and Project Natural Gas Use........................................................................54 Table 11. Existing and Proposed Project Vehicle Fuel Use.......................................................54 Table 12. Project Greenhouse Gas Emissions..........................................................................66 Table 13. Noise Plan Community Noise Exposure Levels (dBA CNEL) ....................................85 Table 14. Allowable Exterior and Interior Noise Levels..............................................................86 Table 15. Project Trip Generation .............................................................................................95 Gardena Industrial Center Project IS/MND iii March 2023 Table 16. Multiple-Dry Years Supply and Demand Comparison (DWR Table 7-4W)...............104 Table 17. Existing and Project Natural Gas Use......................................................................106 Appendices
Appendix A. Transportation Impact Analysis
Appendix B. Air Quality Memo
Appendix C. GHG Memo
Appendix D. Energy Memo
Appendix E. Noise Memo
Appendix F. Phase I Soil Report
Appendix G. Phase II Soil Report and Environmental Summary Appendix H. Low Impact Development Plan
Appendix I. Geotechnical Report
Gardena Industrial Center Project IS/MND iv March 2023
This page intentionally left blank.
Gardena Industrial Center Project IS/MND v March 2023
Acronyms and Abbreviations
°F degrees Fahrenheit
µg/kg micrograms per kilogram
µg/L micrograms per liter
AB Assembly Bill
ADT average daily traffic
Alquist-Priolo Alquist-Priolo Earthquake Fault Zoning Act AMSL above mean sea level
AST aboveground storage tank
bgs below ground surface
BMP best management practice
CAA Clean Air Act
CAAQS California Ambient Air Quality Standards
CAL FIRE California Department of Forestry and Fire Protection Cal/OSHA California Occupational Safety and Health Administration CalEEMod California Emissions Estimator Model
CalEPA California Environmental Protection Agency
Caltrans California Department of Transportation
CAP climate action plan
CARB California Air Resources Board
CCAA California Clean Air Act
CCR California Code of Regulations
CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CESA California Endangered Species Act
CFC chlorofluorocarbon
CFG Code California Fish and Game Code
CFR Code of Federal Regulations
CH4 methane
CNDDB California Rare Plant Rank
CNEL community noise equivalent level
CNPS California Native Plant Society
CO carbon monoxide
CO2 carbon dioxide
CO2e carbon dioxide equivalent
CRHR California Register of Historical Resources
cy cubic yard
dB decibel
dBA A-weighted decibel
DPM diesel particulate matter
DTSC California Department of Toxic Substances Control
EIR environmental impact report
FEMA Federal Emergency Management Agency
FESA federal Endangered Species Act
Gardena Industrial Center Project IS/MND vi March 2023
GHG greenhouse gas
GIS geographic information system
gpm gallons per minute
GPS Global Positioning System
GSF gross square feet
GWP global warming potential
HFC hydrofluorocarbon
HRA health risk assessment
HVAC heating, ventilation, and air conditioning
I- Interstate
IS initial study
Ldn day-night average sound level
Leq equivalent continuous sound level
Lmax maximum sound level
Lmin minimum sound level
LOS level of service
LUST leaking underground storage tank
MBTA Migratory Bird Treaty Act
mg/kg milligrams per kilogram
mg/L milligrams per liter
MMRP Mitigation Monitoring and Reporting Program
MMT millions of metric tons
mpg miles per gallon
mph miles per hour
MSCP Multiple Species Conservation Program
MT metric ton
N2O nitrous oxide
NAAQS National Ambient Air Quality Standards
NAGPRA Native American Graves Protection and Repatriation Act NAHC Native American Heritage Commission
NCCP natural community conservation plan
ND negative declaration
NO nitric oxide
NO2 nitrogen dioxide
NOAA National Oceanic and Atmospheric Administration
NOx nitrogen oxides
NPDES National Pollutant Discharge Elimination System
NRHP National Register of Historic Places
O&M operations and maintenance
O3 ozone
OEHHA California Office of Environmental Health Hazard Assessment OSHA Occupational Safety and Health Administration
PCB polychlorinated biphenyl
PFC perfluorocarbon
PM particulate matter
PM10 particulate matter measuring no more than 10 microns in diameter Gardena Industrial Center Project IS/MND vii March 2023 PM2.5 fine particulate matter measuring no more than 2.5 microns in diameter Porter-Cologne Act Porter-Cologne Water Quality Control Act ppb parts per billion
ppm parts per million
PPV peak particle velocity
PRC California Public Resources Code
project Hitco Industrial
RAQS Regional Air Quality Strategy
RCRA Resource Conservation and Recovery Act
ROG reactive organic gas
ROW right-of-way
RTP Regional Transportation Plan
RWQCB Regional Water Quality Control Board
SAA streambed alteration agreement
SB Senate Bill
SF6 sulfur hexafluoride
SIP State Implementation Plan
SO2 sulfur dioxide
SOx sulfur oxides
SR- State Route
SVOC semivolatile organic compound
SWPPP stormwater pollutant prevention plan
SWRCB State Water Resources Control Board
TAC toxic air contaminant
TCR tribal cultural resource
USACE U.S. Army Corps of Engineers
USDA U.S. Department of Agriculture
USDOT U.S. Department of Transportation
USEPA U.S. Environmental Protection Agency
USFWS U.S. Fish and Wildlife Services
USGS U.S. Geological Survey
UST underground storage tank
v/c volume to capacity
VdB vibration decibel
VMT vehicle miles traveled
VOC volatile organic compound
Gardena Industrial Center Project IS/MND viii March 2023 This page intentionally left blank.
Gardena Industrial Center Project IS/MND ix March 2023
Document Overview
This Initial Study/Mitigated Negative Declaration (IS/MND) has been prepared in accordance with California Environmental Quality Act (CEQA) and the CEQA Guidelines for the proposed Gardena Industrial Center Project. The primary intent of this document is to determine whether project implementation would result in potentially significant impacts to the environment.
In accordance with CEQA, projects that have the potential to result in either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment must undergo analysis to disclose potential significant effects. The provisions of CEQA apply to California governmental agencies at all levels, including local agencies, regional agencies, state agencies, boards, commissions, and special districts. CEQA requires preparation of an IS for a discretionary project to determine the range of potential environmental impacts of that project and to define the scope of the environment review document. As specified in Section 15064(f) of the CEQA Guidelines, the lead agency may prepare a Mitigated Negative Declaration if, in the course of the IS analysis, it is recognized that the project may have a significant impact on the environment, but that implementation of specific mitigation measures would reduce potentially significant impacts to a less than significant level. As the lead agency for the Proposed Project, the City of Gardena has the principal responsibility for conducting the CEQA environmental review to analyze the potential environmental effects associated with project implementation. During the review process, it was determined that no potentially significant impacts would occur. Therefore, an IS/MND has been prepared for the Proposed Project.
This IS/MND is organized as follows:
• Section 1: Project Description. This section introduces the document and discusses the project description including location, setting, and specifics of the lead agency and contacts. • Section 2: Initial Study Checklist. This section discusses the CEQA environmental topics and checklist questions and identifies the potential for impacts. • Section 3: List of Preparers. This section lists the organizations and individuals who were consulted and/or prepared this IS/MND.
• Section 4: References. This section presents a list of reference materials consulted during preparation of this IS/MND.
Gardena Industrial Center Project IS/MND x March 2023
Public Review
The IS/MND will be circulated for a 30-day public review period from October 13, 2022 through November 14, 2022.
Comments regarding this IS/MND must be made in writing and submitted to:
City of Gardena
Community Development Department
1700 West 162nd Street
Gardena, California 90247
Attn: Amanda Acuna, Senior Planner
or by email to [email protected].
The City invites you to submit written comments describing your specific environmental concerns. If you are representing a public agency, please identify your specific areas of statutory responsibility if applicable. Written comments are desired at the earliest possible date, but due to the time limits mandated by State law, your response must be sent no later than 30 days after the receipt of this notice. If a responsible or trustee agency fails to respond within this time period, the Company may presume that your agency has no response to make pursuant to CEQA Guidelines Section 15082(b)(2).
Gardena Industrial Center Project IS/MND 1 March 2023
Section 1 Project Description
The following Initial Study (IS) and Environmental Checklist presents information on the Project and an evaluation of the probable environmental effects anticipated by the Gardena Industrial Center Project (Proposed Project). This Initial Study has been prepared in accordance with the California Environmental Quality Act of 1970 (CEQA), as amended, the CEQA Guidelines, and the City of Gardena’s City Guidelines.
1.1 Project Location
The Proposed Project is located at 1600 West 135th Street in the City of Gardena (City). The 296,630 square foot Project Site is located between the following local thoroughfares: 135th Street to the north, 139th Street to the south, Normandie Avenue to the east, and South Western Avenue to the west. The Project Site is approximately 1 mile west of Interstate 110, approximately 1.2 miles south of Interstate (I) 105, and 3.8 miles east and 0.5 miles north of I-405. Figure 1, Regional Location, shows the Project regional location, while Figure 2, Project Site, depicts the Project Site and the surrounding area.
1.2 Environmental Setting
The City of Gardena is located in the South Bay region of the County of Los Angeles (County).
The Project Site is in an urban area of the southwest region of the County and is currently occupied by a silica and carbon-based products manufacturing company. Generally, the City is an urbanized community. Surrounding the Project Site is 135th Street to the north and industrial uses to the east, south, and west. The Project Site is located within 0.25 miles of bus stops at the intersection of Western Avenue and 135th Street, which provide service to GTrans Line 2 and Line 4. The City is surrounded by the unincorporated community of Athens to the north, the Los Angeles neighborhood of Harbor Gateway to the east and south, the city of Torrance to the southwest, the Los Angeles neighborhood of Alondra Park and Hawthorne to the west, and the city of Hawthorne to the northwest.
1.2.1 Surrounding Land Uses
The Proposed Project is surrounded by industrial uses on all sides, as well as commercial and residential uses in the peripheral areas. Some residences are located between industrial buildings.
The closest residences are located at the intersection of West 135th Street and Halldale Avenue, approximately 350 feet northeast of the Project Site, and near the intersection of West 135th Street and Normandie Drive, approximately 800 feet west of the site. 135th Street Elementary is located further east of the Proposed Project. Purchase Avenue Elementary is located further west of the Proposed Project. Rowley Memorial Park is also located further west of the Proposed Project.
Gardena Industrial Center Project IS/MND 2 March 2023
1.2.2 Existing General Plan and Zoning
The Project Site is currently designated as General Industrial by the City of Gardena General Plan Land Use Map and is zoned as General Industrial (M-2).
1.3 Project Description
1.3.1 Proposed Project Description
The Proposed Project involves the demolition of all existing on-site buildings, totaling 296,630 square feet of building space, parking lots, and associated improvements. This consists of buildings 1-13, 21, 32, 44, 46, 51, 65, 69 73 and 75 as shown on Figure 3, Previous Recognized Environmental Conditions. The Proposed Project would entail the demolition of all structures on site. The site has been used to manufacture silica and carbon-based products since original construction. The site was formerly part of a larger property that was occupied by various owners. Most recently, the site has been occupied by Avcorp Composite Fabricators, manufacturers of composite aerospace components. As shown in Figure 4, Site Plan, the Proposed Project consists of a new 190,860-square foot tilt-up concrete industrial building, constituting of 180,860 square feet of industrial uses and 10,000 square feet of office uses. The proposed building has been designed to accommodate up to two tenants with a wide variety of uses, including light assembly, manufacturing, e-commerce, and warehousing/distribution. The Proposed Project is concurrently applying for a conditional use permit (CUP) for warehousing/distribution and a site plan review (SPR).
1.3.2 Proposed Project Design
The forward-looking configuration of the proposed industrial building includes two-story lanterns of glass that accentuate the office corners of the facility creating solid and void in the massing of the 42-foot-tall facilities as shown in Figure 5a, Elevations, and Figure 5b, Elevations. Clearstories of glazing are proposed high on the concrete tilt up panels between the transparent corners providing natural light deep into the building footprint. Concrete panel elements are proposed to be used as accents and multi-colored paint compositions to break down the scale of the concrete tilt up walls. At 36 feet clear, the tall envelope of the building has been designed to accommodate a wide range of users that require efficient facilities.
1.3.3 Open Space and Landscaping
Ten foot setbacks with landscaping along the property lines are proposed for compliance with the development code. The new landscaping would have varied tree species and shrubs with plant species that are consistent with the surrounding area and meet drought tolerant requirements.
Gardena Industrial Center Project IS/MND 3 March 2023
1.3.4 Lighting
The Proposed Project is required to comply with the City’s requirements for outdoor lighting, which shall demonstrate an average of two footcandles with no single point less than one footcandle for all public/common areas. The Proposed Project’s lighting plan would include night lighting for parking areas, walkways, and driveways. Outdoor lights would cast downward and would be shrouded to prevent glare.
1.3.5 Access, Circulation, and Parking
The circulation for the Proposed Project has been designed to ensure the safe and efficient movement of cars and trucks throughout the Project Site. Two 45-feet wide driveways would be provided on West 135th Street. Parking is proposed to be located in surface parking lots on the North side of the proposed industrial building fronting West 135th Street with additional stalls available in the rear of the proposed building. The Proposed Project does not provide more parking than what is required by the City, but includes 220 parking spaces. Parking impacts, in and of themselves, are exempt from CEQA review.
1.3.6 Grading and Drainage
The approximate earthwork numbers are 20,749 cubic yards of cut, 20,749 cubic yards of fill and 17,721 cubic yards of over-excavation as shown in Figure 6a, Grading Plan, and Figure 6b, Grading Plan. The site is expected to balance cut with fill. The Proposed Project includes the construction of low impact development (LID) stormwater management systems. Infiltration is not an option at this site so the site will use two (2) interconnected WetlandMod units (at-grade with plants) and two (2) sets of StormTech MC-3500 detention chambers sized to treat 1.5x the StormWater Quality Design Volume.
1.3.7 Demolition and Construction
The Proposed Project would result in the demolition of the existing buildings and all surface pavements on the site. See Figure 7, Building Numbers, for existing on site buildings.
1.3.8 Project Phasing
The Proposed Project would be implemented in phases upon approval of necessary discretionary actions and permits. The current tenant is set to vacate the site between December 2022 and April 2023. The demolition and construction phases of the Proposed Project are tentatively scheduled to start in 2023 and anticipated to take approximately 12-14 months.
1.4 Project Approvals and Permits
The City is the lead agency under CEQA and has the principal approval authority over the Proposed Project. A responsible agency is a public agency other than the lead agency that has Gardena Industrial Center Project IS/MND 4 March 2023
responsibility for carrying out or approving a project (CEQA Guidelines, Section 15381, and California Public Resources Code, Section 21069). The following discretionary actions would be required to implement the Project (Table 1, Anticipated Discretionary Actions/Approvals).
Table 1. Anticipated Discretionary Actions/Approvals
Lead Agency Action
City of Gardena CUP: Conditional Use Permit
SPR: Site Plan Review
Responsible Agencies Action
Los Angeles Regional Water Quality Control Board. Approval of a Remedial Action Plan (RAP).
Date: 6/13/2022 - Last saved by: Randy.Deodat - Path: C:\GIS\Projects\City of Gardena\Map Docs\IS_MND\Figure1_RegionalLocation.mxd Laguna
Beach
Laguna
Hills Coto De
Caza
Newport
Beach
Mission
Viejo
Trabuco
Highlands
Costa
Mesa
Irvine
Huntington
Beach
Tustin
Seal
Beach
Garden
Grove
Orange
Anaheim
Placentia Yorba Linda Fullerton
Perris
Corona
March
Woodcrest AFB
Norco Moreno
Valley
Riverside
Rubidoux
Wildomar
Lake
Elsinore
Torrance Carson
Long
Beach
Redondo Cerritos Beach
Gardena Bellflower Compton
El Segundo
Downey
Culver
City Diamond
Bar
Industry
Walnut
Beverly
Hills
Covina Alhambra
Pomona
Claremont
Glendora
San Fernando
Valley
Lake
Los
Angeles
Lancaster
Irwindale
Burbank Monrovia
Altadena
Pasadena Glendale
Acton
Palmdale
Quartz
Hill
Chino
Hills
Chino
Loma
Linda Ontario Bloomington Colton
Upland Fontana Rialto
Crestline
Lake
Arrowhead
Hesperia
Apple
Valley
Victorville
Adelanto
Rosamond
Edwards
AFB
Mojave
Cypress
Inglewood
Whittier
Commerce
Montebello
Rosemead
Arcadia
Los Angeles County
Orange County
San Bernardino County
Kern County
Los Angeles County
Los Angeles County
Riverside County
Orange County
Orange County
P a c i f i c O c e a n
£¤101
£¤395
ÄÆ90
ÄÆ48
ÄÆ18
ÄÆ47
ÄÆ57
ÄÆ170
ÄÆ14
ÄÆ39
1 ÄÆ18
ÄÆ91
ÄÆ259
ÄÆ60
ÄÆ57
ÄÆ91
ÄÆ103
ÄÆ39
ÄÆ55
ÄÆ91
ÄÆ73
ÄÆ159
ÄÆ189
ÄÆ241
ÄÆ142
ÄÆ107
ÄÆ187
ÄÆ206
ÄÆ126
ÄÆ134
ÄÆ213
ÄÆ133
ÄÆ173
ÄÆ71
ÄÆ60
ÄÆ22
ÄÆ72
ÄÆ2
ÄÆ90
ÄÆ83
ÄÆ27
ÄÆ18
ÄÆ1
ÄÆ58
ÄÆ19
ÄÆ66
ÄÆ138
ÄÆ74
ÄÆ60
ÄÆ14
ÄÆ2
ÄÆ138
§¨¦405
§¨¦405
§¨¦5
§¨¦5
§¨¦710
§¨¦10
§¨¦605
§¨¦215
§¨¦605
§¨¦210
§¨¦5
§¨¦105
§¨¦210
§¨¦10
§¨¦15
Gardena Hitco Project
Project Site
Incorporated Areas
Project Site
!(^
Regional Location
Source: ESRI 2022.
Figure 1
± 0 5 10
Miles
Gardena Industrial Center Project IS/MND 6 March 2023
This page intentionally left blank.
Opal Wy
140th Pl
W 131st St
Parron Ave
Hobart Blvd
W 145th Pl
Mariposa Ave
W Cottage Pl
Kansas Ave
Brighton Ave
147th St
S Western Ave
148th St
W 149th St
W 134th Pl
W 150th St
Marine Ave
W 127th St
W 124th St
W 126th St
W 125th St
La Salle Ave
Denker Ave
S Kingsley Dr
Halldale Ave
W 141st St
W Rosecrans Ave
S Normandie Ave
Raymond Ave
Alma Ave
S Budlong Ave
Daleside Ave
Haas Ave
Berendo Ave
S Catalina Ave
W 146th Pl
W 145 145th St th St
W 144th St
Manhattan Pl
Saint Andrews Pl
Wilton Pl
Van Buren Ave
Catalina Ave
Cimarron Ave
Rosecrans Ave
W 139th St
W 146th St
W El Segundo Blvd
W 135th St
Ruthelen St
Gramercy Pl
W 130th St
W 132nd St
W 134th St
ProjectSite Date: 7/26/2022 - Last saved by: Randy.Deodat - Path: C:\GIS\Projects\City of Gardena\Map Docs\IS_MND\Figure2_ProjectSite.mxd Source: Maxar Imagery 2020.
± 0 500 1,000
Feet Project Site
Source: Maxar Imagery 2020.
Figure 2
Gardena Hitco Project
Gardena Industrial Center Project IS/MND 8 March 2023
This page intentionally left blank.
Source: Enercon 2022.
Path: C:\GIS\Projects\County of Santa Cruz\SV Redwoods Trail Project Permitting\Map Docs\EIR\Segments8_9 Feet
0 100 200 Figure 3 N
Previous Recognized Environmental Conditions
Gardena Hitco Project
B08 (Soil Gas)
5/9/2016
Depth 5 Feet
PCE 45.5
TCE 94.6
W 139th Street
W 135th Street
14c
LEGEND:
PCE
Recognized Environmental Condition
Larger Property
HITCO II Property
Approximate Site Boundary
Feet below the ground surface
Tetrachloroethene
Trichloroethene
No detectable concentration above
the laboratory reporting limit
Concentration in soil gas in micrograms
per liter (ug/l)
Concentration in soil in milligrams
per kilogram (mg/kg)
Concentration exceeds regulatory
screening level in soil gas
Concentration exceeds regulatory screening
level in soil
ND
0.656
Feet
TCE
B27 (Soil)
5/5/2016
Depth 5 Feet 10 Feet
PCE 0.2 ND<0.004
B22 (Soil)
5/3/2016
Depth 5 Feet 10 Feet
PCE 0.0814 0.11
B16 (Soil)
5/3/2016
Depth 5 Feet 10 Feet
PCE 0.145 0.00839
0.145
REC No. 3
REC No. 6
REC No. 5
REC No. 4
REC
6 14b
Proposed Building
PREVIOUS RECOGNIZED ENVIRONMENTAL
CONDITIONS AND 2016 LABORATORY RESULTS
1600 AND 1606 WEST 135TH STREET
GARDENA, CALIFORNIA
FIGURE
4 PROJECT NO.
DATE
101251002
08/22
Yellow highlighted cell indicates concentration which exceeds a regulatory screening level
Approximate Scale, Feet
0 100 200
Dimensions, Directions, and Locations are
Approximate
50 Gardena Industrial Center Project IS/MND 10 March 2023 This page intentionally left blank.
Source: HPA Architecture 2022.
Path: C:\GIS\Projects\City of Gardena\Map Docs\IS_MND\Support Files Feet
0 45 90 Figure 4
Site Plan
Gardena Hitco Project
N
Gardena Industrial Center Project IS/MND 12 March 2023
This page intentionally left blank.
Source: HPA Architecture 2022.
Path: C:\GIS\Projects\City of Gardena\Map Docs\IS_MND\Support Files Figure 5a
Elevations
Gardena Hitco Project
Gardena Industrial Center Project IS/MND 14 March 2023
This page intentionally left blank.
Source: HPA Architecture 2022.
Path: C:\GIS\Projects\City of Gardena\Map Docs\IS_MND\Support Files Figure 5b
Elevations
Gardena Hitco Project
Gardena Industrial Center Project IS/MND 16 March 2023
This page intentionally left blank.
Source: Thienes Engineering Inc 2022.
Path: C:\GIS\Projects\City of Gardena\Map Docs\IS_MND\Support Files Feet
0 45 90 Figure 6a
Grading Plan
Gardena Hitco Project
N
Gardena Industrial Center Project IS/MND 18 March 2023
This page intentionally left blank.
Source: Thienes Engineering Inc 2022.
Path: C:\GIS\Projects\City of Gardena\Map Docs\IS_MND\Support Files Feet
0 45 90 Figure 6b
Grading Plan
Gardena Hitco Project
N
Gardena Industrial Center Project IS/MND 20 March 2023
This page intentionally left blank.
LEGEND:
W. 135th STREET
HUMAN
DIRT
LOT
REGULATED
WASTE
STORAGE
70 PARKING
51 72
55 NOT 14
RADAR
TEST
54 FORMER
RADAR TEST RANGE
52 7 53
3 DIRT
LOT
DIRT
LOT
10 69
NOZZLE
MACHINING
47 22
CARBON/
PARKING
CARBON FURNACES
60 AUTO &
HYDRO
CLAVES 50
PUMP HOUSE
SUMP PATIOGRASS PATIO
OFFICES FINANCE
OFFICES
20 MATERIALS
FACTORY VBM
62 SVE-1
FIT-UP AREA 61
SVE-2
SVE-3
PROCESS
OVEN
WELDING
SHOP68
SVE-4
SVE-8
SVE-5
16 SVE-6SVE-9
P5
SVE-7
P6
SVE-11
23 J-SVE-1
J-SVE-2
J-SVE-3 SVE-12 SVE-16
AREA 1 DPEW-1 SVE-13
SVE-10
17 SVE-17
SVE-14 PARKING
WAREHOUSE
25 15
SVE-15
FREEZER 26
31 28
COOLER
9 CAFE
3 OVENS
30 MATERIALS
DEVELOPMENT
29 11
56 71
46 TAPE
WRAP
44 4
21 HITCO
PROPERTY
NDT8 AUTO &
HYDRO
CLAVES
5 6
36 RTR
65 32
COMPOSITE
LAY-UP 2
LOBBY RESOURCES
ENGINEERING
MARKETING
AIRCRAFT
STRUCTURE
SUB-ASSY. 1
12 SVE
13 Source: Base map obtained from AECOM Figure 1-3; Site Layout and Location of SVE System, dated January 2021
HITCO II Property
PARKING
TREATMENT
SYSTEM COMPOUND
SHIPPING/
RECEIVING
PARKING
139th STREET
STORAGE
AREA
OFFICE
BRAKE
MOLDING
FORMER
MACHINE SHOP
CLAVE
NOZZLE
OFFICES
NOZZLE
ASSY.
NOZZLE
MACHINING
COOLER
MACHINING
INSULATION
FABRICATION
HYDRAULIC
PRESSES
AIRCRAFT
STRUCTURE
SUB-ASSY
AIRCRAFT
STRUCTURE
SUB-ASSY
HARVARD PL.
ALMA AVENUE
75 73
4 ZER
FREELarger Property 1 Building Number
Treatment System Compound Location
SVE Well Location
Soil Vapor Extraction
Aboveground Pipelines to Treatment Plant
Underground Pipelines to Treatment Plant
Potential Source Areas Under Remediation
SITE
38 39CARBONIZING
SITE PLAN AND BUILDING NUMBERS
1600 AND 1606 WEST 135TH STREET
GARDENA, CALIFORNIA
PROJECT NO.
DATE
101251002
08/22
Approximate Scale, Feet
0 160 320 Dimensions, Directions, and Locations are
Approximate
80 Source: Enercon 2022.
Path: C:\GIS\Projects\City of Gardena\Map Docs\IS_MND\Support Files Feet
0 160 320 Figure 7
Building Numbers
Gardena Hitco Project
N
Gardena Industrial Center Project IS/MND 22 March 2023
This page intentionally left blank.
Gardena Industrial Center Project IS/MND 23 March 2023
Section 2 Initial Study Checklist
The following discussion of potential environmental effects was completed in accordance with Section 15063 of the CEQA Guidelines to determine if the Proposed Project may have a significant effect on the environment.
2.1 Project Information
1. Project title: Gardena Industrial Center Project
2. Lead agency name and address: City of Gardena
Community Development Department
1700 West 162nd Street
Gardena, California 90247
3. Contact person name, address, and
phone number:
Amanda Acuna, Senior Planner
Community Development Department
1700 West 162nd Street
Gardena, California 90247
310-217-9524
4. Project location: 1600 West 135th Street
Gardena, California 90249
APNs 6102-013-026, 6102-013-027
5 Project sponsor’s name and address: Gardena Owner LP
19700 S Vermont Ave, STE 101
Torrance, CA 90502
6. General plan designation: Industrial
7. Zoning: M-2: General Industrial
8. Description of project: Refer to Section 1, Project Description, of this IS/MND.
9. Surrounding land uses and setting: Refer to Section 1 of this IS/MND.
10. Other public agencies whose
approval is required:
Los Angeles Regional Water Quality Control Board
Gardena Industrial Center Project IS/MND 24 March 2023
11. Have California Native American
tribes traditionally and culturally
affiliated with the project area
requested consultation pursuant to
Public Resources Code section
21080.3.1? If so, is there a plan for
consultation that includes, for
example, the determination of
significance of impacts to tribal
cultural resources, procedures
regarding confidentiality, etc.?
Tribal consultation has been completed in
accordance with Assembly Bill 52.
Gardena Industrial Center Project IS/MND 25 March 2023
2.2 Environmental Factors Potentially Affected
The environmental factors checked below would be potentially affected by the project, involving at least one impact that is a “Potentially Significant Impact” as indicated by the checklist on the following pages.
☐ Aesthetics ☐ Agriculture and
Forestry Resources
☐ Air Quality
☐ Biological Resources ☐ Cultural Resources ☐ Energy
☐ Geology and Soils ☐ Greenhouse Gas
Emissions
☐ Hazards and
Hazardous Materials
☐ Hydrology and
Water Quality
☐ Land Use and Planning ☐ Mineral Resources
☐ Noise ☐ Population and
Housing
☐ Public Services
☐ Recreation ☐ Transportation ☐ Tribal Cultural
Resources
☐ Utilities and
Service Systems
☐ Wildfire ☐ Mandatory Findings
of Significance
Gardena Industrial Center Project IS/MND 26 March 2023
2.3 Lead Agency Determination
On the basis of this initial evaluation:
☐ I find that the Proposed Project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
☒ I find that although the Proposed Project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent (state), including implementation of the mitigation measures identified herein. A MITIGATED NEGATIVE DECLARATION will be prepared.
☐ I find that the Proposed Project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
☐ I find that the Proposed Project MAY have a “potentially significant impact” or “potentially significant unless mitigated” impact on the environment, but at least one effect (1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and (2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. ☐ I find that although the Proposed Project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the Proposed Project, nothing further is required.
Signature Date
Amanda Acuna, Senior Planner
City of Gardena
Gardena Industrial Center Project IS/MND 27 March 2023
2.4 Evaluation of Environmental Impacts
This section documents the screening process used to identify and focus on environmental impacts that could result from the project. The checklist portion of the IS begins below and includes explanations of each CEQA issue topic. CEQA requires that an explanation of all answers be provided along with this checklist, including a discussion of ways to mitigate any significant effects identified. The following terminology is used to describe the potential level of significance of impacts:
• No Impact. The analysis concludes that the project would not affect the particular resource in any way.
• Less than Significant. The analysis concludes that the project would not cause substantial adverse change to the environment without the incorporation of mitigation. • Less than Significant with Mitigation Incorporated. The analysis concludes that it would not cause substantial adverse change to the environment with the inclusion of mitigation agreed upon by the applicant.
• Potentially Significant. The analysis concludes that the project could result in a substantial adverse effect or significant effect on the environment, even if mitigation is incorporated. If there are one or more “Potentially Significant Impact” entries when the determination is made, an EIR is required.
Gardena Industrial Center Project IS/MND 28 March 2023
2.4.1 Aesthetics
Except as provided in Public Resources Code
Section 21099, would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Have a substantial adverse effect on a scenic vista? ☐ ☐ ☐ ☒ b. Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic
buildings within a state scenic highway?
☐ ☐ ☐ ☒
c. In non-urbanized areas, substantially degrade the
existing visual character or quality of public views of the site and its surroundings? (Public views are those
that are experienced from publicly accessible vantage
point). If the project is in an urbanized area, would the project conflict with applicable zoning and other
regulations governing scenic quality?
☐ ☐ ☒ ☐
d. Create a new source of substantial light or glare
which would adversely affect day or nighttime
views in the area?
☐ ☐ ☒ ☐
Impact Analysis
a. Would the project have a substantial adverse effect on a scenic vista? No Impact. The Project Site is currently occupied by a silica and carbon-based products manufacturing company and is visible from surrounding land uses, including surrounding roadways, as well as commercial areas, industrial areas, and residential areas. The Project Site is not located within a designated scenic vista area, and there are no scenic vistas designated in the City. As such, visual changes at the Project Site would not adversely affect scenic vistas.
Implementation of the Proposed Project would replace the existing on-site buildings and parking lots with a new 190,860-square foot tilt-up concrete creative industrial building and associated parking and landscaping. Since there are no scenic vistas in the City, the Project would result in no impact to scenic vistas.
b. Would the project substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? No Impact. There are no eligible or officially designated state scenic highways located in the City (Caltrans 2019). The closest scenic highway to the Project Site is State Route (SR) 1, located in Orange County approximately 8 miles south/southwest of the Project Site. SR-1 is not visible from the Project Site, nor is the Project Site visible from SR-1. As such, the Project would not impact scenic resources in a state-designated scenic highway. Therefore, no impact would occur.
Gardena Industrial Center Project IS/MND 29 March 2023
c. Would the project, in non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less Than Significant Impact. California Public Resources Code, Section 21071, defines an “urbanized area” as “(a) an incorporated city that meets either of the following criteria: (1) Has a population of at least 100,000 persons, or (2) Has a population of less than 100,000 persons if the population of that city and not more than two contiguous incorporated cities combined equals at least 100,000 persons.” As of January 2022, the population of Gardena is 59,947 persons (California Department of Finance 2022). However, the City of Torrance borders the City to the south and has a population of 144,433 persons (California Department of Finance 2022).
Therefore, the Project is in an urbanized area, and the following analysis considers whether the Project would conflict with applicable zoning and other regulations governing scenic quality.
The Project Site is an infill site in a developed commercial, industrial, and residential area and the Proposed Project would not significantly degrade the existing visual character of the surrounding area. The scale and massing of the proposed building are consistent with surrounding uses. In an effort to ensure that any future changes related to visual character and quality do not result in adverse impacts, and to ensure the proposed industrial structure is visually compatible with surrounding land uses, the Proposed Project would be designed in accordance with the City’s Municipal Code, Section 18.36.060, which sets forth development standards for the M-2 zone.
The project would have a maximum height of 42 feet, which is under the maximum allowable height sixty-five (65) feet. The Proposed Project would have a FAR (Floor Area Ratio) of 1.0 for the M-2 zone. The Proposed Project would fall within the allowable setbacks as designated in the M-2 zone, in addition to the minimum distance between buildings. The Project Site is located proximate to a major commercial corridor of Western Avenue in the city. A majority of industrial development is located here and contributes to the highly urbanized nature of the area.
Industrial development along South Western Avenue primarily consists of one- to two-story distribution centers, manufacturing warehouses, and wholesale suppliers. Industrial buildings in the City vary in color; however, the majority consist of off-white, tans, and greys to blues.
Residential development near the Project Site, includes residential neighborhoods approximately 350 feet northeast of the Project Site and approximately 800 feet west of the Project Site, consisting of one- to two-story single-family homes, as well as up to three-story multi-family apartment complexes. The Proposed Project would be consistent with the visual character of the area and impacts would be less than significant.
Gardena Industrial Center Project IS/MND 30 March 2023
d. Would the project create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Less Than Significant Impact. The Project Site is located in an urbanized area along a main industrial corridor with many surrounding existing sources of light and glare, including streetlights, interior and exterior commercial and residential building lighting, signage lighting, landscape lighting, and security lighting. Nearby sensitive receptors include the residential uses in the periphery of the Project Site.
Construction of the Project would normally occur Monday through Friday between 7:00 a.m. and 6:00 p.m. and Saturday between 9:00 a.m. and 6:00 p.m. Construction activities would typically occur during daylight hours, and nighttime lighting on the Project Site would not typically be required during the construction phase. Therefore, impacts associated with the occasional use of mobile lighting during construction and temporary security lighting would be less than significant.
Existing sources of light on the Project Site include street lights, vehicle headlights, building and security lights, and parking lot lights. Surrounding uses also include a variety of urban and residential uses. Implementation of the Proposed Project would introduce new light sources; however, the lighting would be consistent with existing lighting on site and in the area. The Proposed Project would be consistent with Section 18.42.150 of the City’s Municipal Code, which establishes lighting and security standards. Additionally, all proposed light fixtures would be consistent with the California Green Building Standards Code (CALGreen) and the Building Energy Efficiency Standards - Title 24 California Code of Regulations, which set forth minimum requirements based on Lighting Zones. These requirements are designed to minimize light pollution in an effort to maintain dark skies and ensure new development reduces backlight, uplight, and glare (BUG) from exterior light sources (CALGreen 2019). The Project Site is located within Lighting Zone 3, which establishes ambient illumination standards for urban areas (California Administrative Code 2019).
The Project would be required to comply with the maximum allowable BUG rating for Lighting Zone 3, as defined in Table 5.106.8 [N] of CALGreen.
With adherence to the above standards for illumination and implementation of the previously outlined design considerations, operational lighting would not adversely affect nighttime views in the area, or result in a new source of substantial light and impacts would be less than significant.
Glare is caused by light reflections from pavement, vehicles, and building materials, such as reflective glass and polished surfaces. During daylight hours, the amount of glare depends on intensity and direction of sunlight. Glare can create hazards to motorists and can be a nuisance for pedestrians and other viewers. Proposed exterior building materials primarily include metal trim, concrete panels, and glass windows. Although metallic materials and glass have been incorporated into project design, the façades of the new buildings would not create substantial glare that would affect daytime views. Metallic materials would typically be finished and display a dull veneer.
Gardena Industrial Center Project IS/MND 31 March 2023
Selected glass would have a low exterior reflectance percentage to maximize daylighting opportunities to interior building spaces. Therefore, building materials would not create a new source of substantial light or glare that would adversely affect daytime views in the area. With adherence to the above design standards and regulations, proposed building materials and lighting would not result in substantial glare that would be received by off-site receptors. Further, the Project would be required to comply with the California Green Building Code, which establishes maximum allowable BUG ratings, which include backlight, uplight, and glare. Therefore, glare impacts would be less than significant.
Gardena Industrial Center Project IS/MND 32 March 2023
2.4.2 Agriculture and Forestry Resources
In determining whether impacts to agricultural
resources are significant environmental effects, lead
agencies may refer to the California Agricultural
Land Evaluation and Site Assessment Model (1997)
prepared by the California Dept. of Conservation as
an optional model to use in assessing impacts on
agriculture and farmland. In determining whether
impacts to forest resources, including timberland,
are significant environmental effects, lead agencies
may refer to information compiled by the California
Department of Forestry and Fire Protection
regarding the state’s inventory of forest land,
including the Forest and Range Assessment Project
and the Forest Legacy Assessment project; and
forest carbon measurement methodology provided
in Forest Protocols adopted by the California Air
Resources Board. Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural use?
☐ ☐ ☐ ☒
b. Conflict with existing zoning for agricultural use, or a Williamson Act contract?
☐ ☐ ☐ ☒
c. Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources
Code section 12220(g)), timberland (as defined by
Public Resources Code section 4526), or
timberland zoned Timberland Production (as
defined by Government Code section 51104(g))?
☐ ☐ ☐ ☒
d. Result in the loss of forest land or conversion of
forest land to non-forest use?
☐ ☐ ☐ ☒
e. Involve other changes in the existing environment
which, due to their location or nature, could result
in conversion of Farmland, to non-agricultural use
or conversion of forest land to non-forest use?
☐ ☐ ☐ ☒
Impact Analysis
a. Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? No Impact. The Project Site is located in a highly urbanized area. According to the California Department of Conservation’s (DOC) California Important Farmland Finder, most of the County—including the City—is not mapped under the Farmland Mapping and Monitoring Program, and, thus, does not contain Prime Farmland, Unique Farmland, or Farmland of Statewide Gardena Industrial Center Project IS/MND 33 March 2023
Importance (collectively Important Farmland) (DOC 2019a). Therefore, no impacts associated with conversion of Important Farmland would occur.
b. Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract? No Impact. According to the California Department of Conservation’s Williamson Act Parcel map for Los Angeles County, the Project Site is not located on or adjacent to any lands under a Williamson Act contract. The Project Site is not zoned for agricultural use, and no Williamson Act contract exists for the site (DOC 2017). In addition, the Project Site and surrounding area are not zoned for agricultural uses, but instead for residential, commercial, industrial, and public facility uses (City of Gardena 2021). Therefore, the Proposed Project would not conflict with existing zoning for agricultural use or with a Williamson Act contract. Therefore, no impact would occur. c. Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))?
No Impact. The Project Site is located within a highly urbanized area. According to the City’s Zoning Map, the Project Site is not located on or adjacent to forest land, timberland, or timberland zoned Timberland Production (City of Gardena 2021). Therefore, no impact would occur. d. Would the project result in the loss of forest land or conversion of forest land to non-forest use? No Impact. The Project Site is located in a highly urbanized area. The Project Site is not located on or adjacent to forest land. No forest land, private timberlands or public lands with forests are located in the City. Therefore, no impact would occur.
e. Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
No Impact. See Section 2.4.2(a). The Project Site is not located on or adjacent to any parcels identified as Important Farmland or forestland. In addition, the Project would not involve changes to the existing environment that would result in the indirect conversion of Important Farmland or forestland located away from the Project Site. Therefore, no impact would occur.
Gardena Industrial Center Project IS/MND 34 March 2023
2.4.3 Air Quality
Where available, the significance criteria
established by the applicable air quality
management district or air pollution control district
may be relied upon to make the following
determinations. Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Conflict with or obstruct implementation of the
applicable air quality plan?
☐ ☐ ☒ ☐
b. Result in a cumulatively considerable net increase
of any criteria pollutant for which the project region
is non-attainment under an applicable federal or
state ambient air quality standard)?
☐ ☐ ☒ ☐
c. Expose sensitive receptors to substantial
pollutant concentrations?
☐ ☐ ☒ ☐
d. Result in other emissions (such as those leading
to odors) adversely affecting a substantial
number of people?
☐ ☐ ☒ ☐
Impact Analysis
a. Would the project conflict with or obstruct implementation of the applicable air quality plan? Less Than Significant Impact. The Project is in the SCAB, which includes portions of Los Angeles, Riverside and San Bernardino counties and all of Orange County. This area covers approximately 12,000 square miles. The SCAQMD consists of the four counties in the SCAB; therefore, the City is within the jurisdiction of the SCAQMD. The SCAQMD significance criteria are used in this analysis to determine the Project’s impact on air quality based on the SCAQMD California Environmental Quality Act (CEQA) Air Quality Guidelines.
SCAQMD administers SCAB’s Air Quality Management Plan (AQMP), which is a comprehensive document outlining an air pollution control program for attaining all California Ambient Air Quality Standards (CAAQS) and National Ambient Air Quality Standards (NAAQS).
The most recent adopted AQMP for the SCAB is the 2016 AQMP (SCAQMD 2017), which was adopted by SCAQMD’s Governing Board in March 2017. The 2016 AQMP focuses on available, proven, and cost-effective alternatives to traditional strategies while seeking to achieve multiple goals in partnership with other entities seeking to promote reductions in greenhouse gases (GHGs) and toxic risk, as well as efficiencies in energy use, transportation, and goods movement (SCAQMD 2017). An update to the AQMP to address ozone nonattainment, the 2022 AQMP, is currently underway, but has not yet been adopted, however, a draft is available at this time and is dated May 2022.
The purpose of a consistency finding with regard to the AQMP is to determine if a project is consistent with the assumptions and objectives of the regional air quality plans and if it would Gardena Industrial Center Project IS/MND 35 March 2023
interfere with the region’s ability to comply with federal and state air quality standards. SCAQMD has established criteria for determining consistency with the currently applicable AQMP in Chapter 12, Sections 12.2 and 12.3, of the SCAQMD CEQA Air Quality Handbook (SCAQMD 1993). These criteria are:
• Whether the project would result in an increase in the frequency or severity of existing air quality violations, cause or contribute to new violations, or delay timely attainment of the ambient air quality standards or interim emission reductions in the AQMP. • Whether the project would exceed the assumptions in the AQMP or increments based on the year of project buildout and phase.
To address the first criterion, project-generated criteria air pollutant emissions have been analyzed for significance and are addressed under Section 2.4.3(b). As presented in Section 2.4.3(b), construction and operation of the Project would not generate criteria air pollutant emissions that exceed SCAQMD’s thresholds.
The second criterion regarding the Project’s potential to exceed the assumptions in the AQMP or increments based on the year of project buildout and phase is primarily assessed by determining consistency between the project’s land use designations and its potential to generate population growth. In general, projects are considered consistent with, and not in conflict with or obstructing implementation of, the AQMP if the growth in socioeconomic factors is consistent with the underlying regional plans used to develop the AQMP (per Consistency Criterion No. 2 of the SCAQMD CEQA Air Quality Handbook). SCAQMD primarily uses demographic growth forecasts for various socioeconomic categories (e.g., population, housing, employment by industry) developed by the Southern California Association of Governments (SCAG) for its Regional Transportation Plan (RTP)/Sustainable Communities Strategy (SCS) (SCAG 2020). This document, which is based on general plans for cities and counties in the SCAB, is used by SCAQMD to develop the AQMP emissions inventory (SCAQMD 2017). The AQMP’s pollutant control strategies are based on the latest scientific and technical information and planning assumptions, including SCAG’s 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS).The SCAG 2016-2040 RTP/SCS and the associated Regional Growth Forecast are generally consistent with the local plans; therefore, the 2016 AQMP is generally consistent with local government plans.
The Project Site is currently designated as General Industrial by the City of Gardena General Plan Land Use Map and is zoned as General Industrial (M-2), which does not allow residential development. Based on the maximum allowable lot coverage of 50 percent and the maximum building height of 45 feet (three stories assumed) for the existing M-2 General Industrial zone, the industrial capacity of the site is approximately 200,000 sf. The main source of emissions from the land use development would be vehicle trips; however, the number of daily trips would decrease, not increase, as a result of the completion of the Proposed Project as compared to the existing use.
Gardena Industrial Center Project IS/MND 36 March 2023
Modeling conservatively assumes that the Project would be developed as a manufacturing facility, which would result in a reduction of 178 daily trips compared to existing conditions. If the Project operates as a warehousing use, it is anticipated to result in a reduction of 728 daily trips compared to existing conditions. If the Proposed Project is developed as a high-cube distribution center, it is anticipated to result in a reduction of 784 daily trips. Therefore, emissions from development of the Proposed Project can be assumed to have been accounted for in the AQMP. Therefore, impacts relating to the Project’s potential to conflict with or obstruct implementation of the applicable AQMP would be less than significant.
b. Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard)?
Less Than Significant Impact. Air pollution is largely a cumulative impact. The nonattainment status of regional pollutants is a result of past and present development, and SCAQMD develops and implements plans for future attainment of ambient air quality standards. Based on these considerations, project-level thresholds of significance for criteria pollutants are relevant in the determination of whether a project’s individual emissions would have a cumulatively significant impact on air quality.
In considering cumulative impacts from the Project, the analysis must specifically evaluate a project’s contribution to the cumulative increase in pollutants for which the SCAB is designated as nonattainment for the CAAQS and NAAQS. If a project’s emissions would exceed SCAQMD’s significance thresholds, it would be considered to have a cumulatively considerable contribution to nonattainment status in the SCAB. If a project does not exceed thresholds and is determined to have less than significant project-specific impacts, it may still contribute to a significant cumulative impact on air quality. The basis for analyzing the Project’s cumulatively considerable contribution is if the Project’s contribution accounts for a significant proportion of the cumulative total emissions (i.e., it represents a “cumulatively considerable contribution” to the cumulative air quality impact) and consistency with SCAQMD’s 2016 AQMP, which addresses cumulative emissions in the SCAB. Table 2, South Coast Air Quality Management District Air Quality Mass Daily Thresholds, details the SCAQMD construction and operation significance thresholds for a project.
Gardena Industrial Center Project IS/MND 37 March 2023
Table 2. South Coast Air Quality Management District Air Quality Mass Daily Thresholds Pollutant
Construction Threshold
(pounds/day) Operational Threshold (pounds/day)
CO 550 550
NOx 100 55
PM10 150 150
PM2.5 55 55
SOx 150 150
VOC 75 55
Source: SCAQMD 2019.
Notes: CO = carbon monoxide; NOx = nitrogen oxides; PM10 = respirable particulate matter; PM2.5 = fine particulate matter; SOx = sulfur oxides; VOC = volatile organic compound
The SCAQMD also identifies localized significance thresholds (LSTs), as shown in Table 3, Source Receptor Area Southwest Coastal Los Angeles County Localized Significance Thresholds, to determine if impacts to air quality are significant based on localized exceedances of the federal and or state ambient air quality standards. LSTs represent the maximum emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard at the nearest sensitive receptor. LSTs are identified for NO2, CO, PM10, and PM2.5 generated on a project site. Localized construction and operational emissions thresholds are determined as a function of the disturbance area (acres) and receptor distance (meters) from the boundary of a site. The maximum disturbance area for the LSTs is 5 acres. The Project Site is approximately 8.46 acres; however; for the purposes of this analysis, the most conservative LSTs (1-acre disturbance) are used to screen for potential localized impacts from Project construction. The nearest receptor distance is approximately 100 meters. The LSTs applicable to the Project are listed in Table 3.
Table 3. Source Receptor Area Southwest Coastal Los Angeles County Localized Significance Thresholds
Air Pollutant
Allowable Emissions (pounds/day)
Construction Operation
NOx 107 107
CO 1,156 1,156
PM10 28 7
PM2.5 9 3
Source: SCAQMD 2009.
Notes: CO = carbon monoxide; NOx = nitrogen oxides; PM10 = respirable particulate matter; PM2.5 = fine particulate matter Gardena Industrial Center Project IS/MND 38 March 2023
Construction
Project construction emissions were estimated using the California Emissions Estimator Model (CalEEMod), version 2020.4.0, based on construction information provided by the City and model default assumptions. Project construction is anticipated to last for 12 to 14 months, which is consistent with the CalEEMod default schedule assumptions for the Project. A total of 296,630 square feet of existing development on the Project Site would be demolished and hauled away.
Cut and fill would be balanced on site; however, implementation of mitigation measure HAZ-1 below would require soil export and no import or export is assumed. Implementation of REC No. 5 and REC No. 6 are anticipated to require the removal of 1,533 cubic yards (CY) of soil and require 110 truckloads for disposal. This area contains slightly elevated levels of PCE and would be disposed of as non-hazardous material. The default disposal trip length of 20 miles is assumed for this material. REC No. 4 would result in approximately 55 CY of hazardous materials requiring 4 truckloads that would require disposal at Simi Valley Dump Site, approximately 51 miles from the site. As such, implementation of HAZ-1 would require 228 total truck trips, with an average haul distance of 21.3 miles. Modeling assumes implementation of the SCAQMD Rule 403 for fugitive dust control, which includes the following dust control measures during ground-disturbing activities: replacing ground cover in disturbed areas quickly, watering exposed surfaces at least two times daily, implementing equipment loading/unloading procedures to reduce fugitive dust, managing dust by watering two times daily, and reducing speed on unpaved roads to less than 15 miles per hour.
Maximum daily emissions levels associated with construction of the Project are shown in Table 4, Estimated Construction Daily Maximum Air Pollutant Emissions (pounds/day). As shown in Table 4, the Project would not exceed SCAQMD construction thresholds for any pollutant. Therefore, the Project would not result in a significant impact related to criteria pollutant emissions during construction. Because emissions of criteria pollutants under the Project would be below applicable thresholds, which are established to assist in maintaining or achieving regional attainment in the SCAB, construction would not result in a cumulatively considerable contribution to regional acute and long-term health impacts related to non-attainment of the ambient air quality standards.
Gardena Industrial Center Project IS/MND 39 March 2023
Table 4. Estimated Construction Daily Maximum Air Pollutant Emissions (pounds/day) Construction Phase VOC NOx CO SOx PM10 PM2.5
Demolition 2 2830 22 <1 79 2
Site preparation 3 28 19 <1 10 6
Grading 2 1820 1516 <1 4 2
Building construction and coating 29 18 25 <1 4 1
Paving 2 10 15 <1 1 <1
Maximum Daily Emissions 29 2830 2225 <1 10 6
SCAQMD Threshold 75 100 550 150 150 55
Significant Impact? No No No No No No
Source: CalEEMod, version 2020.4.0. See Attachment 1 for model output (Appendix B, Air Quality Memo).
Notes: CO = carbon monoxide; NOX = oxides of nitrogen; PM10 = particulate matter less than 10 microns; PM2.5 = particulate matter less than
2.5 microns; SOX = oxides of sulfur; VOC = volatile organic compound Emission quantities are rounded to the nearest whole number. Exact values are provided in Attachment 1 (Appendix B).
Operation
Area sources of air pollutant emissions associated with the Project include fuel combustion emissions from space and water heating, fuel combustion emissions from landscape maintenance equipment, VOC emissions from periodic repainting of interior and exterior surfaces, and natural gas use. Vehicles trips generated by the Project would also contribute to regional emissions of criteria pollutants. However, the Project Site is currently developed with similar facilities.
Operational emissions from existing land uses and the Project are modeled with CalEEMod to estimate the net change in emissions as a result of project implementation. Vehicle trip data was obtained from the Project’s Transportation Impact Analysis (Gibson 2022). The Project is anticipated to result in a net decrease in vehicle trips compared to existing conditions. Modeling conservatively assumes that the Project would be developed as a manufacturing facility, which would result in a reduction of 178 daily trips compared to existing conditions. If the Project operates as a warehousing use, it is anticipated to result in a reduction of 728 daily trips compared to existing conditions. If the Project is developed as a high-cube distribution center, it is anticipated to result in a reduction of 784 daily trips.
The total estimated and net changes in operational emissions from project implementation are provided in Table 5, Operational Daily Maximum Air Pollutant Emissions. As shown in Table 5, operational emissions from the Project would not exceed any of the SCAQMD significance thresholds and would result in a net decrease from existing conditions. Additionally, Project operational emissions would be further reduced through compliance with SCAQMD Rule 2305, Warehouse Indirect Source Rule – Warehouse Actions and Investments to Reduce Emissions (WAIRE) Program. Adopted in 2021, this rule reduces regional emissions of NOX and PM associated with warehouse operations by requiring warehouse owners to implement emissionsreducing features, such as electric vehicle charging infrastructure, to achieve a required number of Gardena Industrial Center Project IS/MND 40 March 2023
points based on annual truck trips. Air quality impacts associated with operation of the Project would be less than significant.
Table 5. Operational Daily Maximum Air Pollutant Emissions Emissions Source
Maximum Daily Emissions (pounds/day)
VOC NOx CO SO2 PM10 PM2.5
Existing Conditions
Area sources 5 <1 <1 <1 <1 <1
Energy sources <1 1 1 <1 <1 <1
Vehicular sources 4 4 43 <1 10 3
Existing Total Operational Emissions 9 5 44 <1 10 3
Proposed Project
Area sources 4 <1 <1 <1 <1 <1
Energy sources <1 1 1 <1 <1 <1
Vehicular sources 3 4 36 <1 9 2
Total Project Operational Emissions 8 5 37 <1 9 2
Net Change from Project (1) 0 (7) 0 (1) (1)
Significance Threshold 55 55 550 150 150 55
Significant Impact? No No No No No No
Source: CalEEMod, version 2020.4.0. See Attachment 1 for model output (Appendix B, Air Quality Memo).
Notes: CO = carbon monoxide; NOx = nitrogen oxides; PM10 = respirable particulate matter; PM2.5 = fine particulate matter; SO2 = sulfur dioxide; VOC = volatile organic compound
Emissions quantities are rounded to the nearest whole number. Exact values are provided in Attachment 1 (Appendix B). c. Would the project expose sensitive receptors to substantial pollutant concentrations? Less Than Significant Impact. Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved. Sensitive population groups include children, older adults, people with acute illnesses, and people with chronic illnesses, especially those with cardiorespiratory diseases.
Residential areas are also considered sensitive to air pollution because residents tend to be home for extended periods of time, resulting in sustained exposure to any pollutants present. Other sensitive receptors include retirement facilities, hospitals, and schools. Recreational land uses are considered moderately sensitive to air pollution. Although exposure periods are generally short, exercise places a high demand on respiratory functions, which can be impaired by air pollution.
Industrial, commercial, and office areas are considered the least sensitive to air pollution. Exposure periods associated with these land use types are relatively short and intermittent because the majority of workers tend to stay indoors most of the time. The Project Site is in a primarily industrial area; however, some residences are located between industrial buildings. The closest residences are at the intersection of West 135th Street and Halldale Avenue, approximately 350 feet northeast of the Project Site, and near the intersection of West 135th Street and Normandie Drive, approximately 800 feet west of the Project Site.
Gardena Industrial Center Project IS/MND 41 March 2023
Carbon Monoxide
CO is a colorless, odorless, poisonous gas produced by combustion processes, primarily mobile sources. When CO gets into the body, it combines with chemicals in the blood and prevents blood from providing oxygen to cells, tissues, and organs. Because the body requires oxygen for energy, high-level exposure to CO can cause serious health effects, including death (USEPA 2021b).
Nitrogen Oxides
NOx is a general term pertaining to compounds including nitric oxide (NO), nitrogen dioxide (NO2), and other oxides of nitrogen. NOx is produced from burning fuels, including gasoline, diesel, and coal. NOx reacts with volatile organic compounds (VOCs) to form ground-level O3 (smog). NOx is linked to a number of adverse respiratory systems effects (USEPA 2021d).
Ozone
Ground-level O3 is not emitted directly into the air but is formed by chemical reactions of “precursor” pollutants (NOx and VOCs) in the presence of sunlight. Major emissions sources include NOx and VOC emissions from industrial facilities and electric utilities, motor vehicle exhaust, gasoline vapors, and chemical solvents. O3 can trigger a variety of health problems, particularly for sensitive receptors, including children, older adults, and people of all ages who have lung diseases, such as asthma (USEPA 2021c).
Particulate Matter
Particulate matter includes dust, metals, organic compounds, and other tiny particles of solid materials that are released into and move around in the air. Particulates are produced by many sources, including the burning of diesel fuels by trucks and buses, industrial processes, and fires.
Particulate pollution can cause nose and throat irritation and heart and lung problems. Particulate matter is measured in microns, which are 1 millionth of a meter in length (or 1 thousandth of a millimeter). PM10 is small (i.e., respirable) particulate matter measuring no more than 10 microns in diameter, while PM2.5 is fine particulate matter measuring no more than 2.5 microns in diameter (CARB 2020b).
Sulfur Dioxide
SO2 is formed primarily by the combustion of sulfur-containing fossil fuels, especially at power plants and industrial facilities. SO2 is linked to a number of adverse effects on the respiratory system (USEPA 2022).
Toxic Air Contaminants
TACs are generated by a number of sources, including stationary sources such as dry cleaners, gas stations, combustion sources, and laboratories; mobile sources such as automobiles; and area Gardena Industrial Center Project IS/MND 42 March 2023
sources such as landfills. The two primary emissions of concern regarding health effects for land development projects are CO and diesel particulate matter (DPM). The health effects of CO are described above. DPM is a mixture of many exhaust particles and gases that is produced when an engine burns diesel fuel. Compounds found in diesel exhaust are carcinogenic. Some short-term (acute) effects of diesel exhaust exposure include eye, nose, throat, and lung irritation and headaches and dizziness. Long-term exposure is linked to increased risk of cardiovascular, cardiopulmonary, and respiratory disease and lung cancer (OSHA 2013).
Construction
Construction equipment exhaust combined with fugitive particulate matter emissions have the potential to expose sensitive receptors to criteria air pollutant emissions because these emissions would occur in the construction area. Consistent with SCAQMD methods, off-site vehicle and truck trips that would be spread out over commute and haul routes are not included in the LST analysis (SCAQMD 2008). As described above, project construction is compared to the most conservative LSTs for the project receptor area and receptor distance. As shown in Table 6, Estimated Construction Daily Maximum Air Pollutant Emissions (pounds/day) Relative to Localized Significance Thresholds.
Table 6. Estimated Construction Daily Maximum Air Pollutant Emissions (pounds/day) Relative to Localized Significance Thresholds
Construction Phase NOx CO PM10 PM2.5
Demolition 21 20 68 2
Site preparation 28 18 10 6
Grading 18 15 4 2
Building construction and coating 15 18 1 1
Paving 10 15 <1 <1
Maximum Daily On-Site Emissions 28 20 10 6
1-Acre LST (allowable emissions) 107 1,156 28 9
Significant Impact? No No No No
Source: CalEEMod, version 2020.4.0. See Attachment 1 for model output (Appendix B, Air Quality Memo).
Notes: CO = carbon monoxide; LST = localized significance threshold; NOX = nitrogen oxides; PM10 = respirable particulate matter; PM2.5 = fine particulate matter; SOX = sulfur oxide; VOC = volatile organic compound Emission quantities are rounded to the nearest hundredth. Exact values are provided in Attachment 1 (Appendix B).
Relative to Localized Significance Thresholds, project construction emissions would not exceed these LST thresholds. On-site construction associated with Project construction would not result in a significant impact to sensitive receptors. In addition to the potential for localized impacts described previously, construction has the potential to result in DPM emissions. The Project would result in a short-term addition of truck trips occurring over a few months. However, the Project Site is currently a source of truck trips, so the net change in trips during the construction period would not be substantial as there are existing truck trips currently. Total construction emissions would be below SCAQMD significance thresholds for particulate matter. Construction associated Gardena Industrial Center Project IS/MND 43 March 2023
with implementation of the Project would not result in a significant impact to sensitive receptors related to DPM.
Operation
Regarding sensitive receptors, the Project Site is currently developed with industrial uses in an existing industrial area. Operation of the Project would be similar to existing conditions. As shown previously in Table 5, the project would result in a net decrease in vehicle emissions compared to existing site operations. Therefore, the Project does not propose any new facilities that would require a health risk assessment for sensitive receptors.
Future project tenants are currently unknown; however, equipment that would result in potential TAC emissions would require permitting from the SCAQMD. Additionally, because the Project would result in a net decrease in vehicle trips, implementation of the Project would not contribute to any CO hotspots. Therefore, impacts to sensitive receptors would be less than significant. d. Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less Than Significant Impact. Construction associated with the Proposed Project could result in minor amounts of odor compounds associated with diesel-heavy equipment exhaust. In addition, the Project could produce objectionable odors during construction from paving, painting, and equipment operation; however, these substances, if present, would be minimal and temporary.
Impacts associated with odors during construction would not result in nuisance odors that would result in a significant impact.
The SCAQMD CEQA Air Quality Handbook identifies certain land uses as sources of odors. Land uses and industrial operations associated with odor complaints include agricultural uses, wastewater treatment plants, food-processing plants, chemical plants, composting operations, refineries, landfills, dairies, and fiberglass molding facilities (SCAQMD 1993). The Project would consist of a new 190,860- square foot tilt-up concrete creative industrial building and would not create any new sources of substantial odor during operation. The Project would not include any of the land uses that have been identified by the SCAQMD as odor sources. Therefore, the Proposed Project would not create objectionable odors and impacts would be less than significant.
Construction of the Project could result in minor amounts of odor compounds associated with diesel heavy equipment exhaust. However, all diesel equipment would not be operating at once, and construction near individual receptors would be temporary. Additionally, SOx is the only criteria air pollutant with a strong, pungent odor (ATSDR 2015). Maximum construction emissions of SOx would be less than 1 pound per day, which is well below the SCAQMD long-term threshold of 150 pounds per day. Therefore, impacts associated with odors during construction would not result in nuisance odors that would result in a significant impact.
Gardena Industrial Center Project IS/MND 44 March 2023
Sources of odor as identified above and in the SCAQMD CEQA Air Quality Handbook would not occur on site. Future Project tenants are currently unknown; however, the proposed building would not accommodate the types of uses that create objectionable orders described above. Additionally, SCAQMD Rule 402 prohibits nuisance odors. Therefore, there would be no long-term operational impacts associated with odors, and this impact would be less than significant.
Gardena Industrial Center Project IS/MND 45 March 2023
2.4.4 Biological Resources
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Have a substantial adverse effect, either directly
or through habitat modifications, on any species
identified as a candidate, sensitive, or special
status species in local or regional plans, policies,
or regulations, or by the California Department of
Fish and Game or U.S. Fish and Wildlife Service?
☐ ☐ ☐ ☒
b. Have a substantial adverse effect on any riparian
habitat or other sensitive natural community
identified in local or regional plans, policies,
regulations or by the California Department of
Fish and Game or US Fish and Wildlife Service?
☐ ☐ ☐ ☒
c. Have a substantial adverse effect on state or
federally protected wetlands (including, but not
limited to, marsh, vernal pool, coastal, etc.) through
direct removal, filling, hydrological interruption, or
other means?
☐ ☐ ☐ ☒
d. Interfere substantially with the movement of any
native resident or migratory fish or wildlife species
or with established native resident or migratory
wildlife corridors, or impede the use of native
wildlife nursery sites?
☐ ☐ ☐ ☒
e. Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
☐ ☐ ☐ ☒
f. Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community
Conservation Plan, or other approved local,
regional, or state habitat conservation plan?
☐ ☐ ☐ ☒
Impact Analysis
a. Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
No Impact. The Project Site is located in a developed part of the City and is surrounded by industrial uses on all sides, as well as commercial and residential uses in the peripheral areas. The nearest open space area as identified by the City’s General Plan is Rowley Memorial Park, which is located approximately 0.67 miles west of the Project Site (City of Gardena 2021). No native habitat is located on the Project Site or in the immediately surrounding area. The Project Site consists of a flat, fully developed lot. Plant species surrounding the Project Site are limited to non-native, Gardena Industrial Center Project IS/MND 46 March 2023
ornamental species located within the public right-of-way. These non-native, ornamental plant species form a non-cohesive plant community that is not known to support any candidate, sensitive or special-status plant species.
As previously mentioned, ornamental landscape trees are found within the public right-of-way.
Pursuant to Chapter 13.60.110 of the City’s Municipal Code, removal of a City tree would require the applicant to obtain a written permit from the City prior to removing a tree located on public property (City of Gardena 2022). However, according to the Project Site plan, trees would not be removed from the public right-of-way. Therefore, the Project would result in no impact to any species identified as candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service.
b. Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? No Impact. The Project Site is located in a predominantly urbanized area, and consists of a flat, fully developed lot. Surrounding land uses include industrial uses on all sides, as well as commercial and residential uses in the peripheral areas. The Project Site does not contain any riparian habitat or other sensitive natural community. Sensitive natural communities are natural communities that are considered rare in the region by regulatory agencies, that are known to provide habitat for sensitive wildlife or plant species, or that are known to be important wildlife corridors. Riparian habitats are those occurring along the banks of rivers and streams. No sensitive natural community or riparian habitat are on site. Therefore, no impact would occur. c. Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
No Impact. Wetlands are defined under the federal Clean Water Act as land that is flooded or saturated by surface water or groundwater at a frequency and duration sufficient to support and that normally does support a prevalence of vegetation adapted to life in saturated soils. Wetlands include areas such as swamps, marshes, and bogs. There are no state or federally protected wetlands located on or near the Project Site. Further, no federally defined waters of the United States or state occur within the Project Site. This includes the absence of federally defined wetlands and other waters (e.g., drainages) and state-defined waters (e.g., streams and riparian extent) (USFWS 2021). Therefore, no impact would occur.
Gardena Industrial Center Project IS/MND 47 March 2023
d. Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
No Impact. Wildlife movement corridors facilitate movement of species between large patches of natural habitat. The Project Site is already fully developed except for non-native landscaping materials and, therefore, lacks suitable habitat for wildlife species and is not a native wildlife nursery site. However, several ornamental trees and other vegetation are on site that require removal, and these may be used for nesting by migratory birds, which are protected under the federal Migratory Bird Treaty Act (USC 16 703–712). The Migratory Bird Treaty Act governs the taking, killing, possession, transportation, and importation of migratory birds, their eggs, parts, and nests. The Act prohibits the take, possession, import, export, transport, sale, purchase, barter, or offering of these activities, except under a valid permit or as permitted in the implementing regulations. If removal of the vegetation occurs during nesting season (typically between February 1 and September 1), the project applicant is required to conduct nesting bird surveys in accordance with the California Department of Fish and Wildlife requirements prior to removal of the trees.
Compliance with the Migratory Bird Treaty Act would ensure that no significant impacts to migratory birds occur. Additionally, the Project Site is located within a highly urbanized area and would not interfere with the movement of any native residents, migratory fish, or wildlife species.
Therefore, no impact would occur.
e. Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
No Impact. As previously mentioned, ornamental landscape trees are found within the public rightof-way. Pursuant to Chapter 13.60.110 of the City’s Municipal Code, removal of a City tree would require the applicant to obtain a written permit from the City prior to removing a tree located on public property (City of Gardena 2022). However, according to the Project Site plan, trees would not be removed from the public right-of-way. Therefore, the Project would result in no impact to any species identified as candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service.
Notably, the City is located in a highly urbanized and dense area. The City is nearly entirely developed, with the exception of a few vacant infill parcels throughout the community. There are no expansive open space areas, natural features or sensitive natural plant communities, or riparian habitats for which to consider conservation (City of Gardena 2010). Therefore, no impact would occur.
Gardena Industrial Center Project IS/MND 48 March 2023
f. Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? No Impact. The Project Site is not located within any habitat conservation plan; natural community conservation plan; or other approved local, regional, or state habitat conservation plan area.
Therefore, the Project would not conflict with the provisions of an adopted conservation plan, and no impact would occur.
Gardena Industrial Center Project IS/MND 49 March 2023
2.4.5 Cultural Resources
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Cause a substantial adverse change in the
significance of a historical resource pursuant to
Section 15064.5?
☐ ☐ ☒ ☐
b. Cause a substantial adverse change in the
significance of an archaeological resource pursuant
to Section 15064.5?
☐ ☐ ☒ ☐
c. Disturb any human remains, including those
interred outside of dedicated cemeteries?
☐ ☐ ☒ ☐
Impact Analysis
a. Would the project cause a substantial adverse change in the significance of a historical resource pursuant to Section 15064.5?
Less Than Significant Impact. Section 15064.5 defines historic resources as resources listed or determined to be eligible for listing by the State Historical Resources Commission, a local register of historical resources, or the lead agency. Generally, a resource is considered “historically significant” if it meets one of the following criteria:
1. Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage
2. Is associated with the lives of persons important in our past
3. Embodies the distinctive characteristics of a type, period, region or method of construction, or represents the work of an important creative individual, or possesses high artistic values
4. Has yielded, or may be likely to yield, information important in prehistory or history The Project Site is located within an urbanized area and is fully developed. Historic aerials from 1952 through 2018 were reviewed, and eleven of the structures within the Project area of potential effect (APE) were constructed more than 50 years ago. The structures are identified as buildings 1 and 2, 3, 4, 5, 10, 12 and 13, 21, 32, and 65. The architectural style of all but one structure is considered Vernacular Industrial and the function of the structures has been primarily manufacturing. Descriptions of the structures are provided below.
Buildings 10, 12 and 13, and 65 are concrete tilt-up structures over concrete slab. These buildings have metal roll-up style doors, and those that contain windows are multi-pane, steel casement style.
All have flat roofs and exterior equipment is either attached to the side or top of the buildings.
Building 10 also has standard style, exterior doors and large fixed picture windows. Buildings 12 and 13 are one building; however, the portion identified as Building 13 is at a lower height.
Gardena Industrial Center Project IS/MND 50 March 2023
Buildings 3, 4, 5, 21, and 32 are corrugated metal buildings on concrete slabs. They have flat roofs, metal roll-up and/or standard exterior doors, and no windows except for Building 21 that had a large window in the past that is currently replaced with metal sheeting. In addition, this building has an awning on the northeast side, of which the purpose is unclear as there is no door or window at this location. Equipment is attached to the side or top of the buildings. Between 1998 and 1999, an addition was constructed on the southwest side of Building 4, and additions to the north side of Building 32 occurred in 1995 and 2012.
Buildings 1 and 2 are one combined building with different architectural styles. Building 1 is a Quonset style brick building with an addition that was added to the east side of the building. The addition is constructed of brick, and multi-pane, steel casement style windows are present on the addition. At the northerly end of the building, another later addition was constructed. It is adjacent to 135th Street, and is two-story, and of frame-stucco construction with a flat roof. Windows include large, picture frame, and fixed, three-pane styles. The roof is flat and surrounded by a façade.
Material awnings are present on the first floor to provide shade where windows and doors are present.
Building 2 is also an addition that is located to the west of Building 1. It is a combination of concrete tilt-up and metal corrugated construction with roll up metal and swing exterior doors. Similar to the other buildings, equipment is attached to the side or top of the buildings.
The property is currently used for aerospace manufacturing. The buildings are used for office, manufacturing, and warehouse purposes. The property was initially developed in the 1940s by Zenith Plastics (1947-1956). Other previous owners include 3M Company (1956-1961), H.I.
Thompson Company (i.e., HITC; 1960-1961), Armco Steel (1969-1985), Owens-Corning Fiberglass Corporation (1985-1987), BP Advanced Materials (BP, 1987-1995), HITCO Technologies, Inc. (1995-1997), HITCO Carbon Composites, Inc. (1997-present), and AV Corp (2015-present).
The buildings are in fair to good condition. None of the buildings are associated with a historic event or persons important to the past, nor do they have an architectural style of note. They do not embody the distinctive characteristics of a type, period, region or method of construction, or represent the work of an important creative individual, or possess high artistic values. They are not likely to yield information important in history beyond what has been documented with this evaluation. None of the buildings are on federal, state, or local lists of designated historic resources and are not eligible for listing. The development is not historically significant, and therefore, the redevelopment would not cause a substantial adverse change in the significance of a historical resource. b. Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5?
Less Than Significant Impact. The Project Site is located within an urbanized area and is fully developed. Any archaeological resources, which may have existed at one time (on or beneath the Gardena Industrial Center Project IS/MND 51 March 2023
site), have likely been previously disturbed or destroyed. Nonetheless, construction activities associated with project implementation have the potential to unearth undocumented resources. In the event that archaeological resources are discovered during project subsurface activities, all earth-disturbing work within a 25-foot radius must be temporarily suspended or redirected until an archaeologist meeting the Secretary of the Interior’s Standards Professional Qualification Standards has evaluated the nature and significance of the find. After the find has been appropriately mitigated, work in the area may resume. With implementation of this standard requirement, a less than significant impact would occur. c. Would the project disturb any human remains, including those interred outside of dedicated cemeteries?
Less Than Significant Impact. California Health and Safety Code, Section 7050.5, requires that in the event that human remains are discovered on a Project Site, disturbance of the site shall halt and remain halted until the County Coroner has conducted an investigation into the circumstances, manner, and cause of any death and the recommendations concerning the treatment and disposition of the human remains have been made to the person responsible for the excavation or to their authorized representative. If the County Coroner determines that the remains are not subject to their authority and if the County Coroner has reason to believe the human remains are those of a Native American, they shall contact the Native American Heritage Commission by telephone within 24 hours. The Proposed Project would comply with existing law, and potential impacts to human remains would be less than significant.
Gardena Industrial Center Project IS/MND 52 March 2023
2.4.6 Energy
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
☐ ☐ ☒ ☐
b. Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?
☐ ☐ ☒ ☐
Impact Analysis
a. Would the project result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation?
Less Than Significant Impact. The existing site currently includes fuel use (i.e., motor gasoline) from vehicles to and from the existing businesses, electricity use from lighting the existing buildings, and natural gas use from water heating. Energy use for the existing site was estimated using the CalEEMod model (Version 2020.4.0) as part of the greenhouse gas (GHG) emissions modeling for the Project. Vehicle fuel use was calculated by the California Emissions Estimator Model (CalEEMod) output, based on traffic data from the Project’s Transportation Impact Analysis (Gibson 2022), and kilogram/carbon dioxide (kg/CO2) per gallon conversion factors from the U.S.
Environmental Protection Agency (USEPA) (2021) for motor gasoline. Table 7, Existing Energy Use, shows the existing energy use on site. A quantification of existing energy use compared with proposed energy use is discussed below.
Table 7. Existing Energy Use
Energy/Fuel Type GHG Emissions (MT CO2e) Amount
Electricity 342 1,921,152 kWh/yr
Natural Gas 192 3,575,859 KBTU/yr
Fossil Fuel 1,594 180,220 gallons
Sources: CalEEMod Version 2040.4.0, USEPA 2021
Notes: GHG = greenhouse gas; KBTU/yr = kilo British thermal unit per year; kWh/yr = kilowatt-hour per year; MT CO2e = metric tons of carbon dioxide equivalent
Assumes a conversion factor of 10.21 kg/CO2 for diesel fuel and 8.78 kg/CO2 for motor gasoline. Detailed calculations are provided in Attachment 1, Fuel Use Calculations (Appendix D, Energy Memo).
Project Construction
Construction of the Project would require temporary energy demand. Construction energy impacts involve the one-time, non-recoverable energy costs associated with construction of structures and associated site features. During construction, the Project would result in an increase in energy Gardena Industrial Center Project IS/MND 53 March 2023
consumption through the combustion of fossil fuels in construction vehicles, worker commute vehicles, and construction equipment and the use of electricity for small tools and other sources. Construction of the Project would require demolition, grading, building construction, paving, and landscaping installation. All construction would be typical for the region and building type. The Proposed Project does not include unusual circumstances that would require unusually high energy use for construction, such as helicopter delivery or highly specialized construction waste disposal requirements.
Fuel consumption from construction of the Project was calculated using the CalEEMod annual carbon dioxide equivalent (CO2e) emissions output prepared for the Project GHG emissions analysis and the kg/CO2 conversion factors from the USEPA (2021) for diesel fuel and motor gasoline. Total diesel fuel use and motor gasoline consumption from operation of construction equipment, haul truck trips, vendor truck trips, and worker vehicle trips is in Table 8, Construction Diesel Fuel and Gasoline Use. When not in use, electric equipment would be powered off to avoid unnecessary energy consumption. Natural gas is not anticipated to be used during construction.
Table 8. Construction Diesel Fuel and Gasoline Use
Fuel Type GHG Emissions (MT CO2e) Gallons
Diesel Fuel 537 52,637
Motor Gasoline 171 19,445
Sources: CalEEMod 2020.4.0; USEPA 2021 (conversion factors).
Notes: GHG = greenhouse gas; MT CO2e = metric tons of carbon dioxide equivalent Includes fuel use from construction equipment, haul truck trips, vendor truck trips, and worker vehicle trips. Assumes a conversion factor of 10.21 kg/CO2 for diesel fuel and 8.78 kg/CO2 for motor gasoline. Detailed calculations are provided in Attachment 1 (Appendix D, Energy Memo).
Project Operation
Operation of the Project would consume energy for things such as water heating, refrigeration, lighting, and electricity. The following includes energy use estimates for electricity, natural gas, and vehicle fuel (fossils fuels) from implementation of the Project. Similar to existing energy use, energy use associated with the Proposed Project was obtained from the Project GHG analysis and was calculated using the CalEEMod output and the kg/CO2 conversion factors from the USEPA (2021) for diesel fuel and motor gasoline. Electricity, natural gas, and fuel use from the Project are separately compared to existing conditions below.
Operation of the Proposed Project would consume electrical energy for several purposes, including but not limited to lighting and equipment operation. Table 9, Existing and Project Electricity Use, shows existing electricity use on site compared with the Project.
Gardena Industrial Center Project IS/MND 54 March 2023
Table 9. Existing and Project Electricity Use
Scenario GHG Emissions (MT CO2e) kWh/yr
Existing 342 1,921,152
Proposed Project 302 1,692,813
Net Electricity Use (40) (228,339)
Sources: CalEEMod 2040.4.0
Notes: GHG = greenhouse gas; kWh/yr = kilowatt-hour per year; MT CO2 = metric tons of carbon dioxide equivalent Operation of the Project would consume natural gas for several purposes, including but not limited to water heating. Table 10, Existing and Project Natural Gas Use, shows existing natural gas use on site compared with the Proposed Project.
Table 10. Existing and Project Natural Gas Use
Scenario GHG Emissions (MT CO2e) KBTU/yr
Existing 192 3,575,859
Proposed Project 206 3,754,650
Net Natural Gas Use 14 178,791
Sources: CalEEMod 2040.4.0
Notes: GHG = greenhouse gas; KBTU/yr = kilo British thermal unit per year; MT CO2 = metric tons of carbon dioxide equivalent Vehicles trips to and from the Project Site would result in fuel consumption. Table 11, Existing and Proposed Project Vehicle Fuel Use, shows the net fuel use from implementation of the Project compared with existing conditions. Vehicle trip data was obtained from the Project’s Transportation Impact Analysis (Gibson 2022). This estimate is conservative because it assumes that the Project would be developed as a manufacturing facility, which would result in a reduction of 178 daily trips compared to existing conditions. If the Project operates as a warehousing use, it is anticipated to result in a reduction of 728 daily trips compared to existing conditions. If the Project is developed as a high-cube distribution center, it is anticipated to result in a reduction of 784 daily trips.
Table 11. Existing and Proposed Project Vehicle Fuel Use Scenario GHG Emissions (MT CO2e) Gallons
Existing 1,594 180,220
Proposed Project 1,399 158,268
Net Fuel Use (194) (21,952)
Sources: CalEEMod output 2020.4.0; USEPA 2021 (conversion factors).
Notes: GHG = greenhouse gas; MT CO2 = metric tons of carbon dioxide equivalent Assumes a conversion factor of 10.21 kg/CO2 for diesel fuel and 8.78 kg/CO2 for motor gasoline. Detailed calculations are provided in Attachment 1 (Appendix D, Energy Memo).
The Project would be subject to the Title 24 Building Energy Efficiency Standards, which apply to new construction and regulate energy consumed for heating, cooling, ventilation, water heating, and lighting, as further discussed below. Compliance with the most recent applicable Building Energy Efficiency Standards would ensure that the energy efficiency of the proposed buildings is maximized Gardena Industrial Center Project IS/MND 55 March 2023
to the extent feasible. The most recent adopted standards, the 2019 Building Energy Efficiency Standards, include requirements for photovoltaic systems and features such as insulation requirements to reduce electricity demand from the energy grid. The Project would not result in wasteful, inefficient, or unnecessary consumption of energy resources. Impacts would be less than significant. b. Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Less Than Significant Impact. The Project would result in a net decrease in electricity and fossil fuel use compared to existing conditions. The Project would result in a net increase in natural gas use.
However, the Project does not include any features that would result in or encourage the wasteful, inefficient, or unnecessary consumption of energy. The net increase in natural gas would likely be less than demonstrated in Table 10, above, because the CalEEMod modeling does not take into account that the Project would be subject to more stringent Title 24 Building Energy Efficiency Standards compared to the existing buildings. Consistency with energy-related regulations would be required to be demonstrated to obtain necessary building permits. Through compliance with existing energy regulations, the Project would be consistent with CN Goal 4 of the City’s General Plan Community Resources Element, which encourages energy conservation through Title 24 compliance and energy efficient building design and appliance installation. The Project also supports Measures EE:C4 and EE:D1 of the City’s Climate Action Plan, which are to upgrade older commercial buildings and require new buildings to achieve or exceed Title 24 standards.
As discussed previously, the Project would comply with the 2019 CALGreen standards and the Title 24 Building Energy Efficiency Standards.
The Proposed Project would follow applicable energy standards and regulations during construction. In addition, the Proposed Project would be built and operated in accordance with all existing, applicable regulations at the time of construction. Therefore, the Project would not result in a wasteful, inefficient, or unnecessary consumption of natural gas; would decrease electricity and fossil fuel use; and would not conflict with a state or local plan for renewable energy or energy efficiency. Impacts would be less than significant.
Gardena Industrial Center Project IS/MND 56 March 2023
2.4.7 Geology and Soils
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Directly or indirectly cause potential substantial
adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on other
substantial evidence of a known fault? Refer
to Division of Mines and Geology Special
Publication 42.
☐ ☐ ☐ ☒
ii. Strong seismic ground shaking? ☐ ☐ ☒ ☐
iii. Seismic-related ground failure, including
liquefaction?
☐ ☐ ☒ ☐
iv. Landslides? ☐ ☐ ☐ ☒
b. Result in substantial soil erosion or the loss of topsoil? ☐ ☐ ☒ ☐ c. Be located on a geologic unit or soil that is
unstable, or that would become unstable as a result
of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence,
liquefaction or collapse?
☐ ☒ ☐ ☐
d. Be located on expansive soil, as defined in Table 18- 1-B of the Uniform Building Code (1994), creating
substantial direct or indirect risks to life or property? ☐ ☒ ☐ ☐
e. Have soils incapable of adequately supporting the
use of septic tanks or alternative waste water
disposal systems where sewers are not available
for the disposal of waste water?
☐ ☐ ☐ ☒
f. Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
☐ ☒ ☐ ☐
Impact Analysis
a. Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
No Impact. According to the City’s General Plan, no active faults have been identified within the City. According to the Community Safety Element – Public Safety Plan, the closest faults in the Gardena Industrial Center Project IS/MND 57 March 2023
broader project region include the regional San Andreas and San Jacinto faults and the local Newport-Inglewood, Palos Verdes, Whittier-Elsinore, Sierra Madre-Cucamonga, San Fernando and Raymond Hill fault system (City of Gardena 2022). The Newport-Inglewood-Rose Canyon Fault Zone is the closest fault and is located approximately 1.5 miles northeast of the Project Site.
The faults do not entirely underlie the City; the faults do not underlie the Project Site. Thus, although the Project could experience strong seismic ground shaking (see Section 2.4.7(a)(ii)), the Project Site is not susceptible to surface rupture. Therefore, the possibility of significant fault rupture on the site is considered to be low. Therefore, there is no potential for the rupture of a known earthquake fault at the Project Site.
ii. Strong seismic ground shaking?
Less Than Significant Impact. Similar to other areas located in the seismically active Southern California region, the City is susceptible to ground shaking during an earthquake. Numerous faults considered active or potentially active have been mapped in Southern California, including in the vicinity of the City. However, as addressed in Section 2.4.7(a)(i), the Project is not located within an active fault zone, and the site would not be affected by ground shaking more than any other area in the seismically active region. The Geotechnical Report, which is included as Appendix I, concluded that there was no evidence of faulting during the geotechnical investigation. Therefore, the possibility of significant fault rupture on the site is considered low. Additionally, the Proposed Project is required to be constructed in compliance with the 2019 California Building Code (effective January 1, 2020), which contains standards for building design to minimize the impacts from ground shaking. Therefore, impacts from strong ground shaking would be considered less than significant.
iii. Seismic-related ground failure, including liquefaction? Less Than Significant Impact. Liquefaction refers to loose, saturated sand or gravel deposits that lose their load supporting capability when subjected to intense shaking. Any buildings or structures on these sediments may float, sink, or tilt as if on a body of water. According to Figure PS-2:
Seismic Hazard Areas in the City’s Community Safety Element – Public Safety Plan, the southern region of City is located in a liquefaction zone. The liquefaction risk is no greater for the Project Site than it is for the surrounding areas and cities. Additionally, the Project would be designed in accordance with all applicable provisions established in the current California Building Code, which sets forth specific engineering requirements to ensure structural integrity, regardless of the specific geotechnical characteristics of a particular site. The Geotechnical Report also indicated that based on the conditions encountered at the boring locations, and mapping performed by CGS, liquefaction is not considered to be a significant design concern for the Proposed Project.
Therefore, impacts associated with liquefaction would be less than significant.
Gardena Industrial Center Project IS/MND 58 March 2023
iv. Landslides?
No Impact. Susceptibility of slopes to landslides and other forms of slope failure depend on several factors, which are usually present in combination—steep slopes, condition of rock and soil materials, presence of water, formational contacts, geologic shear zones, and seismic activity.
According to the City’s Community Safety Element – Public Safety Plan, the City does not have any known landslide zones (City of Gardena 2022). The Project Site and surrounding area are predominantly flat and lack any substantial topographical variations. No hillsides are located on or adjacent to the Project Site. Therefore, no impacts associated with landslides would occur. b. Would the project result in substantial soil erosion or the loss of topsoil? Less Than Significant Impact. According to the Geotechnical Report, the Project Site and surrounding area are relatively flat and underlain primarily by artificial fill and alluvial soils. The fill soils generally consist of medium stiff to stiff silty clays with occasional loose fine sandy silts with varying medium to coarse sands. The alluvium generally consists of medium dense silty sands and clayey sands, and stiff to very stiff silty clays and sandy clays with occasional very stiff clayey silts and medium dense to dense sands.
Construction Impacts
The Project would involve earthwork and other construction activities that would disturb surface soils and temporarily leave exposed soil on the ground’s surface. Common causes of soil erosion from construction sites include stormwater, wind, and soil being tracked off site by vehicles.
However, construction activities are short-term in nature and would comply with all applicable state and local regulations for erosion control and grading. The Proposed Project would be required to comply with standard regulations, including SCAQMD Rules 402 and 403, which would reduce construction erosion impacts. Rule 403 requires that fugitive dust be controlled with best available control measures so that it does not remain visible in the atmosphere beyond the property line of the emissions source (SCAQMD 2005). Rule 402 requires dust suppression techniques be implemented to prevent dust and soil erosion from creating a nuisance off site (SCAQMD 1976).
The Proposed Project would also incorporate Best Management Practices (BMPs), as shown in Appendix H, Low Impact Development Plan, to ensure that potential water quality impacts from water-driven erosion during construction would be reduced to less than significant.
Operational Impacts
Once operational, the Project Site would be developed with a new 190,860-square foot tilt-up concrete industrial building and associated parking and landscaping. Collectively, these on-site areas would reduce the potential for soil erosion and topsoil loss. The structural and paved improvements would be impervious areas lacking any exposed soils. Therefore, impacts associated with soil erosion and topsoil loss would be less than significant.
Gardena Industrial Center Project IS/MND 59 March 2023
c. Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
Less Than Significant Impact with Mitigation. See responses to Section 2.4.7(a)(iii) for liquefaction and (iv) for landslide impacts. Lateral spreading refers to lateral displacement of large, surficial blocks of soil as a result of pore pressure buildup or liquefaction in a subsurface layer. According to the City’s Community Safety Element – Public Safety Plan, the City is comprised primarily of alluvial soil, containing sand, silt, and clay silts (City of Gardena 2022). The Project Site soil is classified as Urban land-Aquic Xerorthents, fine substratum-Cropley complex, which is described as discontinuous human-transported material over mixed alluvium derived from granite and/or sedimentary rock (USDA 2019).
As addressed in Section 2.4.7(a)(iii), the southern region of the City has been identified as being located in a liquefaction hazard zone. However, the liquefaction risk is no greater for the Project Site than it is for the surrounding areas and cities. As previously discussed, the Proposed Project would be designed in accordance with all applicable provisions established in the current California Building Code, which sets forth specific engineering requirements to ensure structural integrity, regardless of the specific geotechnical characteristics of a particular site. Additionally, the City has relatively flat topography and is not known to have any landslide zones. In accordance with the California Building Code, Appendix J, which has been adopted by the City of Gardena, a geotechnical report has been prepared for the Project. The Geotechnical Report also includes specific recommendations based on the results of the subsurface evaluation and laboratory testing, review of referenced geologic materials, and geotechnical analysis. These recommendations address earthwork, seismic design parameters, foundations, lateral earth pressures, underground utilities, sidewalk and hardscapes, preliminary pavement design, corrosivity, concrete placement, and drainage, among other factors. Therefore, impacts would be less than significant. d. Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Less Than Significant Impact with Mitigation. As described in the City’s Community Safety Element – Public Safety Plan, the City is comprised primarily of alluvial soil, containing sand, silt, and clay silts (City of Gardena 2022). The U.S. Department of Agriculture’s Web Soil Survey does not identify the Project Site or surrounding areas as clay soils, which are typically expansive. The Project Site is classified as Urban land-Aquic Xerorthents, fine substratum-Cropley complex, which is described as discontinuous human-transported material over mixed alluvium derived from granite and/or sedimentary rock (USDA 2021). The Proposed Project would involve excavation of existing soil and import of materials. The imported soil materials would meet the California Building Code standards and would be required to have an expansion index of 20 or less. Such imported materials are anticipated to contain sufficient fines (binder material) to result in a stable Gardena Industrial Center Project IS/MND 60 March 2023
subgrade when compacted, and are required to be approved by the geotechnical engineer of record before being transported to the Project Site. The near-surface soils at this Project Site range from silty clays, sandy clays, clayey sands, and silty sands with occasional sandy silts. Laboratory testing performed on a representative sample of the near-surface soils indicates that these materials possess a medium expansion potential (EI = 51). Based on the presence of expansive soils at this site, care should be given to proper moisture conditioning of all building pad subgrade soils to a moisture content of 2 to 4 percent above the ASTM D-1557 optimum during site grading. The Geotechnical Report also includes specific recommendations based on the results of the subsurface evaluation and laboratory testing, review of referenced geologic materials, and geotechnical analysis. These recommendations address earthwork, seismic design parameters, foundations, lateral earth pressures, underground utilities, sidewalk and hardscapes, preliminary pavement design, corrosivity, concrete placement, and drainage, among other factors Therefore, the Proposed Project would not be on expansive soil, and substantial risks to life or property due to expansive geologic unit would be less than significant. e. Would the project have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? No Impact. Development of the Proposed Project would not require the installation of a septic tank or alternative wastewater disposal system. The Project would use the existing local sewer system.
Therefore, no impact would result from septic tanks or other on-site wastewater disposal systems. f. Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
Less Than Significant Impact with Mitigation. The Project Site has been previously disturbed.
Further, according to the U.S. Department of Agriculture’s Web Soil Survey, the Project Site is underlain by Urban land-Aquic Xerorthents, fine substratum-Cropley complex, which is described as discontinuous human-transported material over mixed alluvium derived from granite and/or sedimentary rock (USDA 2021). Human-transported fill materials generally do not contain significant paleontological resources on or very near the surface immediately underlying the Project Site. Therefore, the likelihood of affecting paleontological resources within the Project Site is considered low. Nonetheless, it is always possible that intact paleontological resources are present at subsurface depths that were not impacted by previous grading activities. For instance, at depths below human-transported fill materials, there is a greater likelihood of encountering sediments that are old enough to contain significant paleontological resources. Given these factors, the likelihood of impacting paleontological resources within the Project Site is considered low above the original ground surface, increasing with depth. Nonetheless, paleontological resources may possibly exist at deep levels and could be unearthed with implementation of the Project.
Gardena Industrial Center Project IS/MND 61 March 2023
Mitigation Measure GEO-2 would require Worker Awareness and Environmental Program (WEAP) Training for construction personnel involved in ground disturbing activities. Mitigation Measure GEO-3 details the appropriate steps in the event paleontological resources are encountered during ground disturbing activities, including the requirement for all work within a 25-foot radius of the find to be halted and a professional vertebrate paleontologist be contacted to evaluate the find. With implementation of the Conditions of Approval, a less than significant impact would occur.
Mitigation Measures
Mitigation Measure GEO-1: Prior to issuance of a grading permit, grading plans shall be prepared in conformance with the grading recommendations included in the Geotechnical Report prepared for the proposed project (see Appendix I).
Mitigation Measure GEO-2: Prior to commencement of ground-disturbing activities, a qualified vertebrate paleontologist (as defined by the Society for Vertebrate Paleontology) shall develop Worker Awareness and Environmental Program (WEAP) Training for construction personnel.
This training shall be presented to construction personnel and include what fossil remains may be found within the Project area and policies and procedures that must be followed in case of a discovery. Verification of the WEAP Training shall be provided to the Gardena Community Development Department.
Mitigation Measure GEO-3: If fossils or fossil bearing deposits are encountered during grounddisturbing activities, work within a 25-foot radius of the find shall halt and a professional vertebrate paleontologist (as defined by the Society for Vertebrate Paleontology) shall be contacted immediately to evaluate the find. The paleontologist shall have the authority to stop or divert construction, as necessary. Documentation and treatment of the discovery shall occur in accordance with Society of Vertebrate Paleontology standards. The significance of the find shall be evaluated pursuant to the State CEQA Guidelines. If the discovery proves to be significant, before construction activities resume at the location of the find, additional work such as data recovery excavation may be warranted, as deemed necessary by the paleontologist and full-time paleontological monitoring shall occur for the remainder of ground disturbance for the Project.
Gardena Industrial Center Project IS/MND 62 March 2023
2.4.8 Greenhouse Gas Emissions
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Generate greenhouse gas emissions, either
directly or indirectly, that may have a significant
impact on the environment?
☐ ☐ ☒ ☐
b. Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions
of greenhouse gases?
☐ ☐ ☒ ☐
Impact Analysis
Regulatory Setting
Federal
The U.S. Environmental Protection Agency is responsible for implementing federal policy to address global climate change. In 2009, the U.S. Environmental Protection Agency issued a Final Rule for mandatory reporting of GHG emissions, which applies to fossil fuel and industrial gas suppliers, direct GHG emitters, and manufacturers of heavy-duty and off-road vehicles, and requires annual reporting of emissions. This rule does not regulate the emission of GHGs; it only requires the monitoring and reporting of GHGs for those sources above certain thresholds.
State
California has enacted a variety of legislation relating to climate change, much of which has set aggressive goals for GHG emissions reductions throughout the state. California Executive Order S-03-05 (2005) establishes the goal of reducing GHG emissions to 2000 levels by 2010, to 1990 levels by 2020, and to 80 percent below 1990 levels by 2050. In September 2006, Governor Schwarzenegger signed California’s Global Warming Solutions Act of 2006 (AB 32), requiring the California Air Resources Board to establish a statewide GHG emissions cap for 2020 based on 1990 emissions and to adopt mandatory reporting rules for significant sources of GHG emissions.
In April 2015, Governor Brown signed Executive Order B-30-15, which established the goal of reducing GHG emissions to 40 percent below 1990 levels by 2030.
Regional
The City is in the South Coast Air Basin, and the South Coast Air Quality Management District (SCAQMD) is the agency primarily responsible for comprehensive air pollution control in the basin. To provide GHG emissions guidance to the local jurisdictions in the South Coast Air Basin, the SCAQMD organized a working group to develop GHG emissions analysis guidance and thresholds. In 2008, the SCAQMD’s governing board adopted a tiered interim approach for Gardena Industrial Center Project IS/MND 63 March 2023
determining GHG emissions significance, whereby the level of detail and refinement needed to determine significance increases with a project’s total GHG emissions. The approach defines projects that are exempt under the California Environmental Quality Act (CEQA) (Tier 1) and projects that are in a GHG Reduction Plan (Tier 2) as less than significant. Tier 3 provides numerical GHG significance threshold of 3,000 MTCO2e per year for all land use types (SCAQMD 2008).
Local
In 2017, the City, in cooperation the South Bay Cities Council of Governments, prepared a Climate Action Plan (CAP), which includes the goal to reduce GHG emissions to 15 percent below 2005 levels by the year 2020 and the longer-term GHG reduction goal of 49 percent below 2005 levels by 2035. The interim and longer-term goals put the City on a path toward the state’s long-term goal to reduce emissions 80 percent below 1990 levels by 2050. The CAP outlines the City’s existing sustainability efforts, including improved bicycle infrastructure and partnerships to increase energy efficiency. The CAP included additional measures to reduce GHG emissions to accomplish the City’s GHG reduction targets in five broad categories: Land Use and Transportation, Energy Efficiency, Energy Generation, Solid Waste, and Urban Greening (City of Gardena 2017).
Methodology
SCAQMD Thresholds
In 2008, SCAQMD formed a Working Group to identify GHG emissions thresholds for land use projects that could be used by local lead agencies in the SoCAB. A Proposed Project would be evaluated against the following tiers and a determination would be made as to which tier would be most appropriate for the individual project:
• Tier 1 consists of evaluating whether or not the project qualifies for any applicable exemption under CEQA. If the project qualifies for an exemption, no further action is required. The project is not exempt from CEQA; therefore, Tier 1 does not apply. • Tier 2 consists of determining whether or not the project is consistent with a GHG Reduction Plan that may be part of a local government plan. The GHG Reduction Plan must, at a minimum, comply with AB 32 GHG reduction goals, include an emissions inventory agreed upon by either CARB or the SCAQMD, have been analyzed under CEQA and have a certified final CEQA document, and have monitoring and enforcement components. If the Proposed Project is consistent with the qualifying GHG reduction plan, it is not significant for GHG emissions. The City does not have a qualified CAP, therefore, Tier 2 does not apply.
• Tier 3 includes a screening level threshold of 3,000 MTCO2e per year that is intended to achieve a regional emissions capture rate of 90 percent. That is, most future projects Gardena Industrial Center Project IS/MND 64 March 2023
would be required to implement GHG reduction measures while excluding small projects that would contribute a relatively small fraction of the cumulative statewide GHG emissions. Consistent with the SCAQMD method, construction emissions should be amortized over a 30-year project life and added to operational emissions. The following analysis uses Tier 3. The project would result in a significant GHG emissions impact if annual project operation and amortized construction emissions would exceed the screening level threshold of 3,000 MTCO2e.
Modeling Methodology
Construction
Project construction emissions were estimated using the California Emissions Estimator Model (CalEEMod), version 2020.4.0, based on construction information provided by the City and model default assumptions. Project construction is anticipated to last for 12 to 14 months, which is consistent with the CalEEMod default schedule assumptions for the project. A total of 230,889 square feet of existing development on the project site would be demolished and hauled away. Cut and fill would be balanced on site, and no import or export is assumed. Detailed assumptions and modeling datasheets are provided in Appendix C, GHG Memo.
Operation
Operational emissions from existing land uses and the project are modeled with CalEEMod to estimate the net change in emissions as a result of project implementation. Vehicle trip data was obtained from the project’s Transportation Impact Analysis (Gibson 2022) (see Appendix A).
Modeling assumptions were provided for both the assumption as a manufacturing facility as well as the assumption of a warehouse use.
a. Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
Less Than Significant Impact. Global climate change refers to changes in average climatic conditions on Earth, including changes in temperature, wind patterns, precipitation, and storms.
Global warming, a related concept, is the observed increase in average temperature of Earth’s surface and atmosphere. One identified cause of global warming is an increase of GHGs in the atmosphere. The GHGs defined under California’s Assembly Bill 32 include carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6).
Single projects do not generate enough GHG emissions on their own to influence global climate change; therefore, the GHG impact analysis measures the project’s contribution to the cumulative environmental impact. Implementation of the project would contribute to global climate change directly through GHG emissions from construction through vehicle engine exhaust from construction equipment, on-road truck trips, and worker commuting trips. Operational sources of Gardena Industrial Center Project IS/MND 65 March 2023
GHG emissions include energy use (electricity and natural gas), area sources (landscaping equipment), vehicle use, solid waste generation, and water conveyance and treatment.
The Project includes the development of a new 190,860-square foot tilt-up concrete creative industrial building. Modeling conservatively assumes that the project would be developed as a manufacturing facility, which would result in a reduction of 178 daily trips compared to existing conditions (see Appendix A). If the project operates as a warehousing use, it is anticipated to result in a reduction of 728 daily trips compared to existing conditions. If the Project is developed as a high-cube distribution center, it is anticipated to result in a reduction of 784 daily trips.
Construction
Total GHG emissions associated with construction of the Project would be approximately 72609 MTCO2e. Consistent with SCAQMD guidance, construction emissions are amortized over a 30- year project lifetime and added to project operational emissions. Amortized construction emissions would be approximately 24 MTCO2e per year.
Operation
The existing total operational emissions is 2,456 MTCO2e, whereas the total Project operational emissions for the Proposed Project is 2,212 MTCO2e. In addition, construction would contribute minimal emissions when amortized over 30 years. Since the Proposed Project would result in the reduction of GHG emissions from daily trips, the Project would not exceed the 3,000 MTCO2e threshold. Therefore, impacts would be less than significant.
Implementation of the Proposed Project would not result in a significant impact related to GHG emissions.
b. Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Less Than Significant Impact. There are numerous State plans, policies and regulations adopted for the purpose of reducing GHG emissions. The principal overall State plan and policy is Assembly Bill (AB) 32, the California Global Warming Solutions Act of 2006. The quantitative goal of AB 32 is to reduce GHG emissions to 1990 levels by 2020. Statewide plans and regulations such as GHG emissions standards for vehicles (AB 1493), the Low Carbon Fuel Standard, and regulations requiring an increasing fraction of electricity to be generated from renewable sources are being implemented at the statewide level; as such, compliance at the project level is not addressed.
Therefore, the Proposed Project does not conflict with those plans and regulations.
As mentioned, the City has adopted a CAP; however, the CAP is a planning tool with optional GHG reduction strategies and is not a qualified CAP for use for CEQA streamlining. In the absence of a City-specific threshold, guidance from the SCAQMD is used to evaluate the significance of Gardena Industrial Center Project IS/MND 66 March 2023
project emissions. SCAQMD guidance consists of a tiered approach for evaluating GHG emissions for development projects where the SCAQMD is not the lead agency. The project is not exempt from CEQA, and a local qualified CAP is not adopted; therefore, Tiers 1 and 2 of the SCAQMD approach do not apply to the project. Tier 3 establishes a numerical screening level threshold of 3,000 MTCO2e per year for all land use types. Projects that do not exceed the bright-line threshold would result in a less than cumulatively considerable impact on GHG emissions. This threshold is based on the AB 32 GHG reduction target and 2020 GHG emissions inventory. The SCAQMD has yet to publish a quantified GHG efficiency threshold for the 2030 target. Although the SCAQMD has not published a quantified threshold beyond 2020, this assessment uses the scaled threshold of 2,520 MTCO2e per year, which was calculated for the buildout year of 2024 based on the GHG reduction goals of Senate Bill 32 and Executive Order B-30-15. As shown in Table 12, Project Greenhouse Gas Emissions, below, operational emissions for the Proposed Project would be 2,212 MTCO2e which is below the threshold of 2,520 MTCO2e.
Table 12. Project Greenhouse Gas Emissions
Emissions Source Annual GHG Emissions (MTCO2e)
Existing Conditions
Area sources <1
Energy sources 534
Vehicular sources 1,593
Solid waste 131
Water 197
Existing Total Operational Emissions 2,456
Proposed Project
Area sources <1
Energy sources 508
Vehicular sources 1,399
Solid waste 117
Water 163
Amortized construction 24
Total Project Operational Emissions 2,212
Net Change from Project (244)
Significance Threshold 2,520
Significant Impact? No
As discussed above, the Proposed Project is an energy-efficient project that would result in insignificant GHG emissions, and would comply with all applicable requirements to further minimize GHG emissions. The Proposed Project would not conflict with applicable plans or regional measures to meet statewide GHG emissions reduction goals. Therefore, impacts would be less than significant.
Gardena Industrial Center Project IS/MND 67 March 2023
2.4.9 Hazards and Hazardous Materials
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
☐ ☐ ☒ ☐
b. Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
☐ ☒ ☐ ☐
c. Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or
waste within one-quarter mile of an existing or
proposed school?
☐ ☐ ☒ ☐
d. Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a
result, would it create a significant hazard to the
public or the environment?
☐ ☒ ☐ ☐
e. For a project located within an airport land use plan or, where such a plan has not been adopted, within
two miles of a public airport or public use airport,
result in a safety hazard or excessive noise for
people residing or working in the project area?
☐ ☐ ☐ ☒
f. Impair implementation of or physically interfere with an adopted emergency response plan or
emergency evacuation plan?
☐ ☐ ☒ ☐
g. Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury or death involving wildland fires?
☐ ☐ ☐ ☒
Impact Analysis
a. Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Less Than Significant Impact. Construction of the Proposed Project would likely involve the use of some hazardous materials, such as vehicle fuels, solvents, paints, oils, and grease. Operation of the Proposed Project would involve an unquantifiable, but limited, use of potentially hazardous materials typical of industrial uses, including cleaning fluids, detergents, solvents, adhesives, sealers, paints, fuels/lubricants, and fertilizers and/or pesticides for landscaping. The use, storage, transport, and disposal of hazardous materials by construction workers and tenants of the Proposed Project would be required to comply with existing regulations of several agencies, including the California Department of Toxic Substances Control, U.S. Environmental Protection Agency, Gardena Industrial Center Project IS/MND 68 March 2023
Occupational Safety and Health Administration, California Department of Transportation, and City codes. Impacts would be less than significant.
b. Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Less Than Significant With Mitigation. The term “hazardous material” can be defined in different ways. For purposes of this environmental document, the definition of “hazardous material” is the one outlined in the California Health and Safety Code, Section 25501:
Hazardous materials that, because of their quantity, concentration, or physical or chemical characteristics, pose a significant present or potential hazard to human health and safety or to the environment if released into the workplace or the environment. Hazardous materials include, but are not limited to, hazardous substances, hazardous waste, and any material that a handler or the unified program agency has a reasonable basis for believing that it would be injurious to the health and safety of persons or harmful to the environment if released into the workplace or the environment.
“Hazardous waste” is a subset of hazardous materials, and the definition is essentially the same as in the California Health and Safety Code, Section 25117, and in the California Code of Regulations, Title 22, Section 66261.2:
Hazardous wastes are those that, because of their quantity, concentration, or physical, chemical, or infectious characteristics, may either cause, or significantly contribute to an increase in mortality or an increase in serious illness, or pose a substantial present or potential hazard to human health or the environment when improperly treated, stored, transported, disposed of, or otherwise managed.
Hazardous materials can be categorized as hazardous nonradioactive chemical materials, radioactive materials, and biohazardous materials (infectious agents such as microorganisms, bacteria, molds, parasites, viruses, and medical waste).
Exposure of the public or the environment to hazardous materials could occur through the following: improper handling or use of hazardous materials or hazardous wastes, particularly by untrained personnel; transportation accident; environmentally unsound disposal methods; and/or fire, explosion, or other emergencies. The severity of potential effects varies with the activity conducted, the concentration and type of hazardous material or wastes present, and the proximity of sensitive receptors.
Gardena Industrial Center Project IS/MND 69 March 2023
Following is a discussion of the Proposed Project’s potential to create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials during the construction and operational phases.
In July 2021, Ardent Environmental Group, Inc. completed a Phase I Environmental Assessment (Phase I ESA) (see Appendix F) of the Project Site. As part of its real estate due diligence, the Project Applicant retained Ardent to prepare a Phase I Environmental Site Assessment (ESA) and Document Review for the site (referred to as the “2021 Phase I ESA”; Ardent, 2021). The 2021 Phase I ESA identified a number of recognized environmental conditions (RECs). Some of these RECs needed further evaluation to assess the extent of impacted soil that will be encountered during redevelopment. A Phase II Environmental Site Assessment (see Appendix G) was conducted and presents the results of this further investigation. The Phase II ESA also documents the results of a site-specific HHRA completed using previous soil gas data collected by others. The HHRA was prepared to determine whether a possible vapor intrusion issue was present in the existing buildings that will remain. Also, an Environmental Summary was completed which is also included in Appendix G.
The Phase II ESA was completed in August, 2021. Based on the 2021 Phase I ESA and a review of these previous investigations, Ardent identified four areas needing further evaluation to determine if soil remediation was needed (REC No. 3) and to further assess the extent of impacted soils (REC Nos. 4, 5, and 6). The following presents the results of the Phase I and II ESAs. • REC No. 3: Area 6 – Former Acetone UST - Based on the data collected in the vicinity of REC No. 3, the residual concentrations of VOCs, namely PCE and TCE, in soil and soil gas would not pose a threat to future workers or occupants of the site and would not threaten groundwater. Therefore, this area would no longer be considered an REC and no further work is necessary.
• REC No. 4: Area 14b – Adjacent East of “Not HITCO Property” - Based on the data collected in the vicinity of REC No. 4, the vertical and lateral extent of PCE impacted soil has not been fully defined and may encroach onto the adjacent property to the west.
Further onsite investigations and potential onsite remediation are needed. Since this release was first identified during the 2001 FS, the remediation of these soils would be the responsibility of BP.
• REC No. 5: Area 14c – Adjacent East of “Not HITCO Property” - Based on the data obtained in the vicinity of REC No. 5, the depth of PCE-impacted soil exceeding the regulatory screening levels for the protection of groundwater is limited to less than 10 feet bgs. During Ardent’s investigation, the assessment of the lateral extent of impacted soils was limited due to site access constraints (e.g., fenced areas, outbuilding, concrete cut representing possible utilities, and a warehouse building). Based on the data obtained, the lateral extent of impacted soil is anticipated to be approximately 28 feet Gardena Industrial Center Project IS/MND 70 March 2023
wide by 42 feet long. The total volume of bank (i.e., in-place) impacted soils that will need to be remediated during redevelopment is estimated at approximately 436 cubic yards. Since this release was first identified during the 2001 FS, the remediation of these soils would be the responsibility of BP.
• REC No. 6: Boring 16 – Based on the data collected during this investigation, the depth of PCE/TCE-impacted soil exceeding the regulatory screening levels for the protection of groundwater is limited to less than 10 feet bgs in the vicinity of REC No. 6. During Ardent’s investigation, the assessment of the lateral extent of impacted soils to the west of boring B16 was limited due to the close proximity of the existing warehouse building. Based on the data obtained, the lateral extent of impacted soil is anticipated to be approximately 47 feet wide by 63 feet long. The total volume of bank (i.e., inplace) impacted soils that will need to be remediated during redevelopment is estimated at approximately 1,097 cubic yards.
To further evaluate whether a possible vapor intrusion issue was present in the southern portion of the site associated with Building 25 which is planned to continue to be used for commercial purposes, Ardent completed an HHRA using previous soil gas data.
Based on the results of this site specific HHRA, which was completed in accordance with current regulatory guidelines, it was determined that a possible vapor intrusion issue was present.
The Phase II ESA presented a number of recommendations based on the investigation conducted. • REC No. 4 – Further investigations should be completed on-site to determine the vertical and lateral extent of impacted soils that will need to be remediated for the protection of groundwater. Shallow soils that will be encountered during site redevelopment should be excavated and removed to the depth of the proposed geotechnical requirements. Any deep impacted soils could be further remediated by in-situ SVE following redevelopment. • REC No. 5 and REC No. 6 – Shallow VOC-impacted soils should be remediated to concentrations below the SFRWQCB-ESL guidelines for the protection of groundwater by excavation and off-site disposal during redevelopment activities. • Indoor air samples should be collected in Building 25 to assess whether a vapor intrusion issue is present and whether soil vapor mitigation measures are needed to protect future occupants of this building.
• All work should be completed under the direction and approval of the LARWQCB.
Implementation of the recommendations set forth in the Phase II ESA would result in a less than significant impact as well as the implementation of Mitigation Measure HAZ-1 under the oversight and approval of LARWQCB, the Proposed Project would not create a significant hazard to the public or the environment.
Gardena Industrial Center Project IS/MND 71 March 2023
Project Construction
Construction activities of the Proposed Project would involve the use of small amounts of hazardous materials, such as cleaning fluids, detergents, solvents, adhesives, sealers, paints, fuels/lubricants, and fertilizers and/or pesticides for landscaping. However, the materials used would not be in such quantities or stored in such a manner as to pose a significant safety hazard.
These activities would also be short term or one time in nature, and construction workers would be trained in safe handling and hazardous materials use. Additionally, the use, storage, transport, and disposal of construction-related hazardous materials and waste would be required to conform to existing laws and regulations of the federal, state, and local agencies. Compliance with applicable laws and regulations would ensure that all potentially hazardous materials are used and handled in an appropriate manner and would minimize the potential for safety impacts to occur.
Therefore, hazards to the public or the environment arising from the routine use of hazardous materials during project construction would be less than significant and no mitigation measures are necessary.
Project Operation
The project involves construction of a new 190,860-square foot tilt-up concrete creative industrial building. As such, potentially hazardous materials associated with operation of the Project would include those materials typically associated with operation of the Project, such as cleaning and maintenance activities. Although these materials would vary, they would generally include industrial cleaning products, solvents, paints, fertilizers, and herbicides and pesticides. Many of these materials are considered industrial hazardous wastes, common wastes, and universal wastes by the EPA, which considers these types of wastes common to businesses and households and to pose a lower risk to people and the environment than other hazardous wastes when properly handled, transported, used, and disposed of (EPA 2021). Federal, state, and local regulations typically allow these types of wastes to be handled and disposed of under less-stringent standards than other hazardous wastes, and many of these wastes do not need to be managed as hazardous waste.
In addition, any potentially hazardous materials handled on the Project Site would be limited in quantity and concentration, consistent with other similar service sector uses located in the City, and any handling, transport, use, and disposal of such material would comply with applicable federal, state, and local agencies and regulations. In addition, as mandated by OSHA, all hazardous materials stored on the Project Site would be accompanied by a Materials Safety Data Sheet, which would inform on-site personnel and residents of the necessary remediation procedures in the case of accidental release (OSHA 2012). Therefore, operational impacts associated with the use, transport, and disposal of hazardous materials would be less than significant.
Gardena Industrial Center Project IS/MND 72 March 2023
Mitigation Measures
Mitigation Measure HAZ-1: Prior to the issuance of building permits, the Project Applicant shall prepare and implement a Remedial Action Plan or other remedial cleanup program document reviewed and approved by LARWQCB (collectively referred to as the “RAP”) in compliance with Water Board Resolution No. 92-49. Subject to the LARWQCB’s requirements, the RAP shall present the scope of work and schedule to remediate and mitigate all impacted shallow soils to the criteria protective of human health and the environment, including groundwater quality.
The results of the remedial efforts shall be documented in a report that will be submitted to the LARWQCB.
The Remedial Cleanup Program required as mitigation for this project is for the shallow VOC impacted soils on site. Additional remediation for deeper soils and groundwater may be required for this site by LARWQCB, but is not required as part of the mitigation for this project to proceed. However, appropriate access for monitoring, sampling and remediation for impacted deeper soils and impacted groundwater shall be maintained and shall not be affected by the proposed project.
Prior to the issuance of building permits, the Project Applicant shall prepare and implement a Remedial Action Plan or other remedial cleanup program document reviewed and approved by LARWQCB (collectively referred to as the “Final Remedial Cleanup Program”). The LARWQCB may require additional soil, soil vapor, and groundwater investigations prior to submittal of a Final Remedial Cleanup Program. Prior to implementation, the RAP shall be reviewed and approved by the LARWQCB. The Final Remedial Cleanup Program RAP will present the results of the previous work and present a scope of work to facilitate industrial or commercial redevelopment of the Site, including remediation of remediate shallow impacted soil that might be encountered during grading and other redevelopment activities. The Project Applicant shall provide a copy of the Final Remedial Cleanup Program RAP to the City once it has been reviewed and approved by the LARWQCB with confirmation of approval.
Subject to the LARWQCB’s discretion, At a minimum, the Final Remedial Cleanup Program RAP should present the scope of work and schedule to remediate and/or mitigate shallow excavate and remove onsite VOC-impacted soil associated with REC Nos. 4, 5, and 6 so grading and redevelopment can commence. The results of the remedial efforts shall be documented in a report that will be submitted to the LARWQCB.
Prior to issuance of grading permits, a Soil Management Plan (SMP) shall be submitted to the City which shall identify the procedures to manage unknown environmental concerns that might be encountered during redevelopment. This document shall also be submitted to the LARWQCB. The SMP does not need to be approved by the LARWQCB nor the City.
A Vapor Intrusion Mitigation System (VIMS) Design Plan shall be prepared that presents the proposed design and construction details of the vapor mitigation system and submitted to the City along with Gardena Industrial Center Project IS/MND 73 March 2023
construction documents. A VIMS Performance Plan should accompany the VIMS Design Plan and will present baseline indoor air sampling details that will be collected once the building is constructed.
The baseline sampling, compared to subsequent sampling results, will provide evidence that the VIMS is performing adequately and that no human health risks are present for site occupancy. The VIMS Performance Plan will include the baseline and startup sampling procedures, on-going performance monitoring, and operation, monitoring, and maintenance (OM&M) operations. The VIMS Performance Plan will also provide contingencies for further mitigation if unfavorable vapor concentrations are discovered. Following completion of these tasks, the Project Applicant will request a determination from the LARWQCB that no further sampling/monitoring be required. from the LARWQCB.
Prior to issuance of a temporary or final Certificate of Occupancy, a Land Use Covenant (LUC) shall be recorded with the Los Angeles County Registrar-Recorder restricting the property to be used only for industrial and/or commercial uses. Proof or recording shall be provided to the City. Prior to recording, the LUC shall be presented to the LARWQCB for review and approval. c. Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less Than Significant Impact. The Project Site is not located within 0.25 miles of existing schools.
The Project Site is located approximately 0.85 miles west of 135th Street Elementary School, approximately 0.83 miles east of Purchee Avenue Elementary School, and approximately 0.73 miles east of Maria Regina School. Project operations would involve industrial use activities and it is possible that hazardous materials could be used by a future occupant’s daily operations; however, future operations at the Project site would be required to comply with all applicable local, State, and federal regulations related to the transport, handling, and usage of hazardous materials. During project construction, potentially hazardous materials would likely be handled on the Project Site.
Handling of these potentially hazardous materials would be temporary and would coincide with the short-term construction phase of the Project. Any handling, transport, use, or disposal of hazardous materials would comply with all relevant federal, state, and local agencies and regulations, including the USEPA, the California Department of Toxic Substances Control, the California OSHA, Caltrans, the Resource Conservation and Recovery Act, the SCAQMD, and the Los Angeles County Certified Unified Program Agency. Therefore, impacts associated with the emitting or handling of hazardous materials within 0.25 miles of a school would be less than significant. d. Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Less Than Significant Impact With Mitigation. California Government Code, Section 65962.5, requires the compiling of lists of the following types of hazardous materials sites: hazardous waste facilities; hazardous waste discharges for which the State Water Quality Control Board has issued Gardena Industrial Center Project IS/MND 74 March 2023
certain types of orders; public drinking water wells containing detectable levels of organic contaminants; underground storage tanks with reported unauthorized releases; and solid waste disposal facilities from which hazardous waste has migrated.
A review of Cortese List online data resources identifies the following sites that are active within the vicinity of 1600 West 135th Street (SWRCB 2021):
• Aerodynamic Plating Co., Inc. #3: 13629 Saint Andrews Place (Plant #3) • Angelus Plating Works: 1713 West 134th Street
• AVCORP Composite Fabrication Inc.: 1600 W. 135th Street • KB Gardena Building, LLC: 13720 South Western Avenue
All of these sites except for the AVCORP Composite Fabrication Inc. are over 500 feet away from the Proposed Project Site and would not have a significant impact to the site. The larger HITCO property was listed on regulatory databases and is an active remediation site for VOCs in soil and groundwater. These activities are on-going by the responsible party and are located off the subject property. As described above, on-site VOC-impacted soil was historically identified and remediated under the direction of the LARWQCB. Residual contaminants in the shallow soil that is planned to be disturbed during grading will be further remediated by excavation and off-site disposal (see Mitigation Measures HAZ-1). Groundwater beneath the site is still impacted with VOCs due to historical land use. Based on residual contaminants in soil and/or groundwater, a vapor intrusion issue is possible. As noted above, this possible human health risk will be mitigated by installing a VIMS beneath the proposed building. With the implementation of the Mitigation Measure HAZ-1 described above, the Proposed Project would not create a significant hazard to the public or the environment. Therefore, impacts associated with a hazardous materials site would be less than significant with mitigation.
e. For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? No Impact. The Proposed Project is not located within the airport land use plans for these nearby airports (ALUC 2021). The Project Site is located outside of any airport impact zones, and as such, the Project would not result in a safety hazard for people working at the Project Site. The Project Site is located approximately 1.7 miles southeast of Hawthorne Municipal Airport (HHR), approximately 3.7 miles northwest of Compton/Woodley Airport, and approximately 4.9 miles southeast of Los Angeles International Airport (LAX). Additionally, the City of Hawthorne General Plan Noise Element provides noise contours for Hawthorne which show that the noise contours associated with the airport do not extend beyond the municipal boundaries of the City of Hawthorne. Therefore, no impacts associated with a safety hazard or excessive noise resulting from proximity to an airport would occur.
Gardena Industrial Center Project IS/MND 75 March 2023
f. Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
Less Than Significant Impact. As mentioned in the City’s General Plan, the Project would be required to comply with the Gardena Emergency Operations Plan, adopted in 2017. The plan provides a strategy for the City’s planned response to emergency situations. The City’s Community Safety Element – Public Safety Plan shows emergency routes for the City (City of Gardena 2022). The Project would be provided emergency access along West 135th Street and South Western Avenue. The Project Site is also provided regional access via I-110, I-105, and I405, as well as SR-91 and SR-107. Due to the Proposed Project’s local and regional connectivity, in the unlikely event of an emergency, the project-adjacent roadway facilities would be expected to serve as emergency evacuation routes for first responders and residents. The Project would not adversely affect operations on the local or regional circulation system, and as such, would not influence the use of these facilities as emergency response routes. Therefore, impacts associated with an emergency response plan would be less than significant. g. Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
No Impact. According to the California Department of Forestry and Fire Protection’s (CAL FIRE’s) Fire Hazard Severity Zone Map of the County (2020), the Proposed Projects is not located in a Very High Fire Hazard Safety Zone; therefore, the implementation of the Proposed Project would not expose people or structures to a significant risk from wildland fires.
Gardena Industrial Center Project IS/MND 76 March 2023
2.4.10 Hydrology and Water Quality
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Violate any water quality standards or waste
discharge requirements or otherwise substantially
degrade surface or groundwater quality?
☐ ☐ ☒ ☐
b. Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge
such that the project may impede sustainable
groundwater management of the basin?
☐ ☐ ☒ ☐
c. Substantially alter the existing drainage pattern of the site or area, including through the alteration of the
course of a stream or river or through the addition of
impervious surfaces, in a manner which would:
i. Result in substantial erosion or siltation onor off-site? ☐ ☐ ☒ ☐
ii. Substantially increase the rate or amount of
surface runoff in a manner which would result in
flooding on- or offsite?
☐ ☐ ☒ ☐
iii. Create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted runoff?
☐ ☐ ☒ ☐
iv. Impede or redirect flood flows? ☐ ☐ ☒ ☐
d. In flood hazard, tsunami, or seiche zones, risk
release of pollutants due to project inundation?
☐ ☐ ☒ ☐
e. Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater
management plan?
☐ ☐ ☒ ☐
Impact Analysis
a. Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality? Less Than Significant Impact. Construction of the Project would include earthwork activities that could potentially result in erosion and sedimentation, which could subsequently degrade downstream receiving waters and violate water quality standards. Stormwater runoff during the construction phase may contain silt and debris, resulting in a short-term increase in the sediment load of the municipal storm drain system. Substances such as oils, fuels, paints, and solvents may be inadvertently spilled on the Project Site and subsequently conveyed via stormwater to nearby drainages, watersheds, and groundwater. Construction-related erosion effects would be addressed through compliance with the NPDES program’s Construction General Permit. Construction activity subject to this General Permit includes any construction or demolition activity, including, Gardena Industrial Center Project IS/MND 77 March 2023
but not limited to, clearing, grading, grubbing, or excavation, or any other activity that results in a land disturbance of equal to or greater than 1.0 acre. The Project would disturb approximately 8.76 acres and therefore would be subject to the General Permit. To obtain coverage under the General Permit, dischargers are required to file with the State Water Resources Control Board (SWRCB) the Permit Registration Documents (PRDs), which include a Notice of Intent (NOI) and other compliance-related documents. The General Permit requires development and implementation of a Stormwater Pollution Prevention Plan (SWPPP) and monitoring plan, which must include erosion control and sediment-control Best Management Practices (BMPs) that would meet or exceed measures required by the General Permit to control potential construction-related pollutants. Erosion-control BMPs are designed to prevent erosion, whereas sediment controls are designed to trap sediment once it has been mobilized. Also, the Project Site is expected to balance in terms of its construction activities since the approximate earthwork numbers are 20,749 cubic yards of cut, 20,749 cubic yards of fill and 17,721 cubic yards of over-excavation. Therefore, construction impacts associated with water quality standards would be less than significant.
Once operational, the Project Site would be developed with a new 190,860-square foot tilt-up concrete creative industrial building and associated parking and landscaping. Collectively, these on-site areas would reduce the potential for soils erosion and topsoil loss that could affect surface water quality. Additionally, the Proposed Project includes the construction of low impact development (LID) stormwater management systems. Infiltration is not an option at this site so the site will use two (2) interconnected WetlandMod units (at-grade with plants) and two (2) sets of StormTech MC-3500 detention chambers sized to treat 1.5x the StormWater Quality Design Volume. The structural and paved improvements would cover impervious areas lacking any exposed soils. Therefore, operational impacts associated with water quality standards would be less than significant.
b. Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Less Than Significant Impact. The Project will require the use of water for dust suppression during project demolition, grading, and construction. The amount of water that will be required to control dust during grading and construction will be minimal and not significantly impact existing groundwater supplies. Once completed, the Project will require potable water to serve the Project site, water the landscaping and provide required fire flow. The City and the Project Site would receive water service from the Golden State Water Company – Southwest Water System.
According to the Golden State Water Company, the Southwest Water System is a blend of groundwater pumped from the West and Central Coast Groundwater Basins and imported water from the Colorado River Aqueduct and State Water Project (imported and distributed by Metropolitan Water District of Southern California) (Golden State Water Company 2022).
Gardena Industrial Center Project IS/MND 78 March 2023
Additionally, Golden State Water Company (GSWC) has entitlement of groundwater resources in the West and Central Coast Groundwater Basins. Furthermore, GSWC leases additional water rights from entities that no longer pump groundwater but have entitlements, in the attempt to meet the increase in water demand from its service area. As such, GSWC currently has no immediate concern with the availability of water supply to the City. Therefore, impacts associated with groundwater supplies would be less than significant.
The Project involves the construction of a new 190,860-square foot tilt-up concrete creative industrial building and associated parking and landscaping. The Project Site would introduce more pervious areas via landscaping in the front yard and along the perimeters of the Project Site.
Under the existing conditions, the Project Site is occupied by a silica and carbon-based products manufacturing company; therefore, the Project Site is not considered an important location for groundwater recharge. The Project would not substantially impair groundwater recharge necessary to replenish the City’s water supply; thus, impacts related to groundwater recharge would be less than significant.
c. Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i. Result in substantial erosion or siltation on- or off-site? Less Than Significant Impact. There are no streams or rivers located on or near the Project Site.
Project construction would involve some earth-disturbing activities, including grading, that could expose on-site soils to erosion and surface water runoff. However, the Project Site is located within a developed area, with primarily industrial land uses surrounding the Project Site; as such, the development of the Project would not cause a significant change to surface bodies of water in a manner that could cause siltation or erosion. Therefore, impacts would be less than significant. ii. Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite?
Less Than Significant Impact. There are no natural drainage features on or near the Project Site.
The Project Site, in its existing condition, is occupied by a silica and carbon-based products manufacturing company. Construction activities would entail grading, excavation, and other ground-disturbing activities, which could temporarily alter surface drainage patterns and increase the potential for flooding, erosion, or siltation. However, the Project would comply with existing local, state, and federal regulations related to drainage and runoff. As such, the Project would not result in flooding on or off site. According to the Low Impact Development Plan (see Appendix H), the Proposed Project within the south property is a redevelopment Project disturbing less than 50 percent of the impervious surface and the previous development project was not subject to postconstruction stormwater quality control measures, Therefore, only the proposed disturbed areas Gardena Industrial Center Project IS/MND 79 March 2023
must meet the requirements of the Los Angeles County’s Low Impact Development Standards Manual (February 2014). The Proposed Project will disconnect runoff from impervious areas by means of biofiltration systems and underground detention. Additionally, the Project is designed so that pollutants from the impervious surfaces are disconnected prior to discharging offsite. Runoff from the parking lots is conveyed to the biofiltration units for treatment. Additionally, the Project would be required to comply with the NPDES Construction General Permit, which would require implementation of BMPs and erosion control measures, thereby reducing the effects of construction activities on erosion and drainage patterns. The Proposed Project will not substantially increase the rate or amount of surface runoff in a manner, which would result in a flooding on or off-site.
iii. Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Less Than Significant Impact. The Proposed Project would comply with existing local, state, and federal regulations related to drainage and runoff. Furthermore, according to the Low Impact Development Plan (see Appendix H), runoff from the northerly portion of the roof and northerly vehicle parking will drain to catch basins in the drive aisle. A private storm drain will convey the storm water westerly then southerly around the west side of the building. Catch basins in the drive aisle will collect runoff and tie into the storm drain. The storm drain will continue southerly then turn easterly into the truck yard. Three catch basins will collect runoff from the southerly portion of the building roof, truck yard, and easterly drive aisle.
The storm drain will then wrap back around the westerly site of the building and flow north towards 135th Street. The private drain will connect to the existing 8’6” x3’ box. The south property drains to the existing public storm drain in 139th Street. A catch basin in the proposed truck yard will collect the runoff and a storm drain will convey runoff southerly through the drive aisle towards 139th Street. The southern building adjacent to 139th Street will be left as-is. Therefore, impacts associated with stormwater drainage system capacity would be less than significant. iv. Impede or redirect flood flows?
Less Than Significant Impact. The Proposed Project Site does not contain any streams or rivers having the potential to be altered by the Project. The Project Site has been previously graded and is located within a highly urbanized area. According to Figure Ps-3: FEMA Flood Zone Map in the City’s Community Safety Element – Public Safety Plan, the majority of the City is located outside a Federal Management Agency 500-year floodplain, which indicates that the City has less than a 0.9% probability of flooding annually (City of Gardena 2022). Therefore, no impacts associated with impeding or redirecting flood flows would occur.
Gardena Industrial Center Project IS/MND 80 March 2023
d. Would the project, in flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
Less Than Significant Impact. Tsunamis are seismic sea waves generated by sudden movements of the sea floor caused by submarine earthquakes, landslides, or volcanic activity. Seiches are waves that oscillate in enclosed water bodies, such as reservoirs, lakes, ponds, or semi-enclosed bodies of water.
Seiches may be triggered by moderate or large submarine earthquakes or by large onshore earthquakes.
No significant impacts from an earthquake-induced seiche would occur. Mud and debris flows are mass movements of dirt and debris that occur after intense rainfall, earthquakes, and severe wildfires.
The speed of a slide depends on the amount of precipitation and steepness of the slope.
Flooding from tsunami conditions is not expected since the Project Site is located approximately 6.9 miles from the Pacific Ocean. In addition, the National Flood Insurance Program identifies the City as a Zone A area, meaning that the City has a 1 percent annual chance of flooding (i.e., a portion of the City is within the 100-year flood zone). The Project would comply with existing local, state, and federal regulations related to drainage and runoff. Runoff from public streets would be collected into existing curb inlet catch basins and gutters along West 135th Street and 139th Street. Therefore, the Project would not result in flooding on or off site. The Project would not risk release of pollutants due to inundation and a less than significant impact would occur. e. Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Less Than Significant Impact. The Project Site is located within the jurisdiction of the Los Angeles Regional Water Quality Control Board Basin Plan (RWQCB 2014). Construction activities would comply with applicable requirements of the Los Angeles Regional Water Quality Control Board, including compliance with Stormwater Pollution Prevent Plan-mandated BMPs. Compliance with regional and local regulations related to water quality control plans would reduce potential water quality impairment of surface waters. Therefore, the Proposed Project would not conflict with a water quality control plan or sustainable groundwater management plan, and impacts would be less than significant.
Gardena Industrial Center Project IS/MND 81 March 2023
2.4.11 Land Use and Planning
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Physically divide an established community? ☐ ☐ ☒ ☐
b. Cause a significant environmental impact due to a
conflict with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating an
environmental effect?
☐ ☐ ☒ ☐
Impact Analysis
a. Would the project physically divide an established community? Less Than Significant Impact. The Project Site is currently occupied by a silica and carbon-based products manufacturing company. The project is surrounded primarily by industrial uses. The Project Site does not physically divide any community, and redevelopment of the Project Site would not physically divide an established community. The Proposed Project would entail the development of new 190,860-square foot tilt-up concrete creative industrial building. Therefore, a less than significant impact would occur.
b. Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Less Than Significant Impact. The Project Site is currently designated as General Industrial by the City of Gardena General Plan and is classified as General Industrial (M-2) zone. The Proposed Project is concurrently applying for a conditional use permit (CUP) for warehousing/distribution.
If the applicant were to receive approval for the CUP, then the Project would be consistent with the General Plan and Zoning Ordinance. Additionally, the proposed industrial uses would be consistent with the existing industrial uses located in all directions of the Project Site. Thus, the Proposed Project would not conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the Project (including, but not limited to the general plan or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect. Therefore, impacts would be less than significant.
Gardena Industrial Center Project IS/MND 82 March 2023
2.4.12 Mineral Resources
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Result in the loss of availability of a known mineral resource that would be of value to the region and
the residents of the state?
☐ ☐ ☐ ☒
b. Result in the loss of availability of a locallyimportant mineral resource recovery site delineated on a local general plan, specific plan or other land
use plan?
☐ ☐ ☐ ☒
Impact Analysis
a. Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
No Impact. The Project Site is not a locally important mineral resource recovery site according to maps obtained through the California Department of Conservation and California Geological Survey. The Project Site is located within a Mineral Resource Zone 1 (MRZ-1) zone, which is defined as an area where adequate information indicates that no significant mineral deposits are present (DOC 1981). No known mineral resources of value to the region are located in the Project Site; therefore, no impact would occur.
b. Would the project result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact. The Project Site is not a locally important mineral resource recovery site according to maps obtained through the California Department of Conservation and California Geological Survey. The Project Site is located within a Mineral Resource Zone 1 (MRZ-1) zone, which is defined as an area where adequate information indicates that no significant mineral deposits are present (DOC 1981). The implementation of the Proposed Project would not result in the loss of availability of a locally important mineral resource; therefore, no impact would occur.
Gardena Industrial Center Project IS/MND 83 March 2023
2.4.13 Noise
Would the project result in:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the project in excess of standards established in the
local general plan or noise ordinance, or applicable
standards of other agencies?
☐ ☐ ☒ ☐
b. Generation of excessive groundborne vibration or
groundborne noise levels?
☐ ☐ ☒ ☐
c. For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a
plan has not been adopted, within two miles of a
public airport or public use airport, would the project expose people residing or working in the project
area to excessive noise levels?
☐ ☐ ☐ ☒
Impact Analysis
a. Would the project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less Than Significant Impact. The California Department of Transportation defines “noise” as sound that is loud, unpleasant, unexpected, or undesired. Sound pressure levels are quantified using a logarithmic ratio of actual sound pressures to a reference pressure squared, called “bels.” A bel is typically divided into tenths, or decibels (dB). Sound pressure alone is not a reliable indicator of loudness because frequency (or pitch) also affects how receptors respond to sound. To account for the pitch of sounds and the corresponding sensitivity of human hearing to them, the raw sound pressure level is adjusted with a frequency-dependent A-weighting scale that is stated in units of decibels (dBA) (Caltrans 2013).
A receptor’s response to a given noise may vary depending on the sound level, duration of exposure, character of the noise sources, time of day during which the noise is experienced, and activity affected by the noise. Activities most affected by noise include rest, relaxation, recreation, study, and communications. In consideration of these factors, different measures of noise exposure have been developed to quantify the extent of the effects from a variety of noise levels. The community noise equivalent level (CNEL) is the average equivalent A-weighted sound level over a 24-hour period. This measurement applies weights to noise levels during evening and nighttime hours to compensate for the increased disturbance response of people at those times. CNEL is the equivalent sound level for a 24-hour period with a +five dBA weighting applied to sound occurring Gardena Industrial Center Project IS/MND 84 March 2023
between 7 p.m. and 10 p.m. and a +10 dBA weighting applied to sound occurring between 10 p.m. and 7 a.m. (City of Garden 2006a).
The dB level of a sound decreases (or attenuates) as the distance from the source of that sound increases. For a single point source, such as a piece of mechanical equipment, the sound level typically decreases by approximately six dBA for each doubling of distance from the source.
Sound that originates from a linear (or “line”) source, such as vehicular traffic, attenuates by approximately three dBA per doubling of distance. Other contributing factors that affect sound reception include ground absorption, natural topography that provides a natural barrier, meteorological conditions, and the presence of human-made obstacles, such as buildings and sound barriers (Caltrans 2013).
Noise-sensitive land uses include noise receptors (receivers) where an excessive amount of noise interferes with normal activities. The Project Site is located in a primarily industrial area. Industrial uses are not generally considered noise sensitive. However, some residences are located between industrial buildings. The closest residences are located at the intersection of West 135th Street and Halldale Avenue, approximately 350 feet northeast of the Project Site, and near the intersection of West 135th Street and Normandie Drive, approximately 800 feet west of the site.
The most significant noise-producing activity within the City includes vehicle noise from arterials and train movements on the Union Pacific rail line. In addition, numerous fixed sources of noise exist within portions of the City including noise from commercial and industrial operations (City of Gardena 2006a).
City of Gardena General Plan
Applicable policies and standards governing environmental noise in the City are set forth in the General Plan Community Safety Element - Noise Plan (2006). Table N-1 of the Gardena Noise Plan outlines the exterior noise compatibility for community noise environments, replicated below in Table 13, Noise Plan Community Noise Exposure Levels (dBA CNEL). A land use in an area identified as “normally acceptable” indicates that standard construction methods attenuate exterior noise to an acceptable indoor noise level and that people could conduct outdoor activities with minimal noise interference. Land uses that fall into the “conditionally acceptable” noise environment need noise insulation features included in the design. Conventional construction, but with closed windows and fresh air supply systems or air conditioning, usually suffice. For land uses where the exterior noise level falls within the “normally unacceptable” range, new construction or development should generally be discouraged. If new construction or development proceeds, a detailed analysis of noise reduction requirements must be made with noise insulation features included in the design. For land uses where the exterior noise levels fall within the “clearly unacceptable” range, new construction generally should not be undertaken. The Noise Plan includes three goals and associated policies including using noise control to reduce transportation Gardena Industrial Center Project IS/MND 85 March 2023
noise impacts (N Goal 1), incorporating noise considerations into land use planning decisions (N Goal 2), and developing measures to control non-transportation noise impacts (N Goal 3).
Table 13. Noise Plan Community Noise Exposure Levels (dBA CNEL) Land Use Category
Normally
Acceptable
Conditionally
Acceptable
Normally
Unacceptable
Clearly
Unacceptable
Residential – single-family, multi-family, duplex, 50–60 60–65 65–75 75–85 Residential – mobile homes 50–60 60–65 65–75 75–85
Transient lodging, motels, hotels 50–60 60–70 70–80 80–85 Schools, libraries, churches, hospitals, nursing homes 50–60 60–65 65–75 75–85 Auditoriums, concert halls, amphitheaters, meeting halls NA 50–60 60–70 NA Sports arenas, outdoor spectator sports, amusement parks 50—65 65–75 NA 75—85 Playgrounds, neighborhood parks 50–65 65-70 70 –75 75—85 Golf courses, riding stables, cemeteries 50–70 70—75 75–85 NA Office and professional buildings 50–65 65 – 75 75–80 80 – 85 Commercial retail, banks, restaurants, theatres 50 – 70 70 – 80 80 -- 85 NA Industrial, manufacturing, utilities, wholesale, service stations
50–70 70–85 NA NA
Agriculture 50 – 85 NA NA NA
Source: City of Gardena 2006a.
Notes: CNEL = community noise equivalent level; dBA = A-weighted decibel; NA = not applicable (Appendix E, Noise Memo).
City of Gardena Municipal Code – Noise Ordinance
Sections 8.36.040 and 8.36.050 of the City’s Noise Ordinance establish exterior and interior noise standards as it relates to how loud operational noise can be. The allowable noise levels are presented in Table 14, Allowable Exterior and Interior Noise Levels. Subsection 8.36.040(C)states that in the event the ambient noise level exceeds the noise standard, the ambient noise level shall become the noise standard.
Gardena Industrial Center Project IS/MND 86 March 2023
Table 14. Allowable Exterior and Interior Noise Levels
Type of Land Use
15-minute Average Noise (dBA, Leq) Maximum Noise Level (dBA, Lmax) 7:00 a.m. – 10:00 p.m. 10:00 p.m. – 7:00 a.m. 7:00 a.m. – 10:00 p.m. 10:00 p.m. – 7:00 a.m.
Residential 55 50 75 70
Residential portions of
mixed use
60 50 80 70
Commercial 65 60 85 80
Industrial or
manufacturing
70 70 90 90
Allowable Interior Noise Levels
Residential 45 40 65 60
Residential portions of
mixed use
45 40 70 60
Source: City of Gardena 2006b.
Notes: CNEL = community noise equivalent level; dBA = A-weighted decibel; Leq = equivalent continuous sound level Noise levels are measured at the property line of the noise-sensitive land use. 1 This category includes residences, hospitals, and hotels where a nighttime sensitivity to noise is assumed to be of utmost importance. 2 This category includes schools, libraries, theaters, and churches where it is important to avoid interference with activities such as speech, meditation, and concentration on reading material. (Appendix E, Noise Memo).
Per Section 8.36.080 of the City’s Noise Ordinance, project construction activities are explicitly exempt from the exterior and interior noise standards presented in Sections 8.36.040 and 8.36.050.
Specifically, the ordinance states that “noise associated with construction, repair, remodeling, grading or demolition of any real property are exempt from the provisions in Chapter 8.36 (City of Gardena Noise Ordinance), provided said activities do not take place between the hours of 6:00 PM and 7:00 AM on weekdays between the hours of 6:00 PM and 9:00 AM on Saturday or any time on Sunday or a Federal holiday.”
Construction Impact Analysis
Construction of the Project would have the potential to result in temporary noise level increases as a result of operation of heavy equipment and haul trucks. Construction of the Project would generate noise that could expose nearby receptors to elevated noise levels that may disrupt communication and routine activities. The magnitude of the impact would depend on the type of construction activity, equipment, duration of the construction phase, distance between the noise source and receiver, and intervening structures. Sound levels from typical construction equipment range from 76 dBA to 88 dBA Leq at 50 feet from the source (FTA 2018). Noise from construction equipment generally exhibits point source acoustic characteristics. Strictly speaking, a point source sound decays at a rate of six dBA per doubling of distance from the source. The rule applies to the propagation of sound waves with no ground interaction.
Project construction would last for approximately 12 to 14 months and would require typical construction equipment. Therefore, construction would generate noise levels ranging from 76 to 88 dBA Leq at 50 feet from construction activities. The Project Site is surrounded by industrial Gardena Industrial Center Project IS/MND 87 March 2023
buildings that are not considered noise sensitive. Additionally, construction would take place during the allowable hours outlined in Section 8.36.080 of the City’s Noise Ordinance: 7:00 AM to 6:00 PM and weekdays and 9:00 AM to 6:00 PM on Saturdays. Truck trips would be required for hauling material during demolition and delivery of construction materials; however, the site is currently a source of truck trips. Therefore, temporary impacts from construction would be less than significant.
Permanent Increase in Vehicle Noise
The Proposed Project would generate vehicle trips during operation, including personal vehicle trips from employees and truck trips from deliveries. However, the Project Site is currently developed with facilities that general vehicle and truck trips. Based on the Project’s Transportation Impact Analysis (Gibson 2022), the Project is anticipated to result in a net decrease in vehicle trips compared to existing conditions. The Project would generate approximately 178 fewer daily trips than the current use if it would be developed with manufacturing uses. If the Project operates as a warehousing use, it is anticipated to result in a reduction of 728 daily trips compared to existing conditions. If the Project is developed as a high-cube distribution center, it is anticipated to result in a reduction of 784 daily trips. It is anticipated that the Project would have a similar trip distribution as the existing facilities and utilize similar truck routes. Therefore, the Project would be expected to result in similar or reduced ambient vehicle noise compared to existing conditions.
Therefore, potential noise impacts are considered less than significant.
Other Operational Noise Sources
Operation of the Project would be expected to result in stationary noise from heating, ventilation, and air conditioning (HVAC) systems and industrial equipment. The specifications of future HVAC systems and industrial equipment are currently unknown. However, the nearest sensitive receptors are located approximately 350 feet from the Project Site. At this distance, typical noise levels from major mechanical HVAC equipment (69–73 dBA CNEL) at a distance of 50 feet, would be reduced to below the noise compatibility standard of 60 dBA CNEL for sensitive receptors. Industrial equipment would be subject to Noise Ordinance standards as well as Occupational Safety and Health Administration requirements to protect workers from hearing loss.
In addition to HVAC systems, the proposed land uses also have the potential to generate noise from truck deliveries and parking areas. Truck delivery noise sources include engines idling and beeping from back up warning signals at commercial loading docks. State law (13 CCR 2485) currently prohibits heavy-duty diesel delivery trucks from idling more than five minutes.
Therefore, noise from idling will be limited to five minutes during truck deliveries. Beeping from trucks would not be continuous and would only occur while the truck is backing up. Noise sources from parking areas include car alarms, door slams, radios, and tire squeals. These sources are Gardena Industrial Center Project IS/MND 88 March 2023
generally short term and intermittent, and would be different from each other in kind, duration, and location so that the overall effects would be separate.
Additionally, the noise sources associated with the Project, including stationary equipment, truck deliveries, and parking areas would be similar to the operation of the existing industrial uses on the Project Site. The site is surrounded by industrial development that is not considered noise sensitive and therefore would not be sensitive to minor changes in industrial noise on the Project Site. Operational impacts from the Project would be less than significant. b. Would the project result in the generation of excessive groundborne vibration or groundborne noise levels?
Less Than Significant Impact. Excessive groundborne vibration is typically associated with activities such as blasting used in mining operations, or the use of pile drivers during construction.
The primary concern associated with ground-borne vibration is annoyance; however, in extreme cases, vibration can cause damage to buildings, particularly those that are old or otherwise fragile.
Some common sources of ground-borne vibration are trains, and construction activities such as blasting, pile-driving, and heavy earth-moving equipment. The Proposed Project would be constructed using typical construction techniques and would be short-term in nature. No pile driving for construction would be necessary. Thus, significant vibration impacts would not occur.
Heavy construction equipment (e.g., bulldozer and excavator) would generate a limited amount of ground-borne vibration during construction activities at short distances away from the source. The use of equipment would most likely be limited to a few hours spread over several days during demolition/grading activities. Post-construction on-site activities would be limited to mechanical equipment (e.g., air handling unit and exhaust fans) that would not generate excessive groundborne vibration or ground-borne noise. Therefore, ground-borne vibration and noise levels associated with the Proposed Project would be less than significant. c. For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? No Impact. The Proposed Project is not located within the airport land use plans for the nearby airports (ALUC 2021). Thus, the Project would not expose people residing or working in the Project area to excessive noise levels. The Project Site is located approximately 1.7 miles southeast of Hawthorne Municipal Airport (HHR), approximately 3.7 miles northwest of Compton/Woodley Airport, and approximately 4.9 miles southeast of Los Angeles International Airport (LAX).
Therefore, no impacts associated with a safety hazard or excessive noise resulting from proximity to an airport would occur.
Gardena Industrial Center Project IS/MND 89 March 2023
2.4.14 Population and Housing
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Induce substantial unplanned population growth in an area, either directly (for example, by proposing new
homes and businesses) or indirectly (for example,
through extension of roads or other infrastructure)?
☐ ☐ ☒ ☐
b. Displace substantial numbers of existing people or
housing, necessitating the construction of
replacement housing elsewhere?
☐ ☐ ☐ ☒
Impact Analysis
a. Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
Less that Significant Impact. The CEQA Guidelines identify several ways in which a project could have growth-inducing impacts (Public Resources Code, Section 15126.2), either directly or indirectly. Growth-inducement may be the result of fostering economic growth, fostering population growth, providing new housing, or removing barriers to growth. Growth inducement may be detrimental, beneficial, or of no impact or significance under CEQA. An impact is only deemed to occur when it directly or indirectly affects the ability of agencies to provide needed public services, or if it can be shown that the growth will significantly affect the environment in some other way.
The Proposed Project consists of industrial uses and would not result in a significant population increase in the area. The Project is consistent with the most recent uses of the site (industrial uses).
It is also consistent with the zoning and land use designations as light industrial for the Project Site. 1600 West 135th Street would house a new 190,860-square foot tilt-up concrete industrial building designed to accommodate up to two tenants with a variety of uses, including e-commerce, manufacturing, and warehousing/distribution. The employees that would fill the roles anticipated for the Proposed Project would come from the region and therefore not induce unplanned population growth in the area.
b. Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
No Impact. The Project Site is currently occupied by a silica and carbon-based products manufacturing company. No housing units would be demolished as part of the construction of the new industrial building at 1600 West 135th Street. Therefore, the Proposed Project would not displace a substantial number of existing people, necessitating the construction of replacement housing elsewhere.
Gardena Industrial Center Project IS/MND 90 March 2023
2.4.15 Public Services
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Result in substantial adverse physical impacts
associated with the provision of new or physically
altered governmental facilities, need for new or
physically altered governmental facilities, the
construction of which could cause significant
environmental impacts, in order to maintain
acceptable service ratios, response times or other
performance objectives for any of the public services:
Fire protection? ☐ ☐ ☒ ☐
Police protection? ☐ ☐ ☒ ☐
Schools? ☐ ☐ ☒ ☐
Parks? ☐ ☐ ☒ ☐
Other public facilities? ☐ ☐ ☒ ☐
Impact Analysis
a. Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
Fire protection?
Less Than Significant Impact. Fire protection and emergency medical response services in the City are provided by the Los Angeles County Fire Department (LACFD). The LACFD provides service to over 60 58 cities and unincorporated areas throughout the County. The Project Site is served by Fire Station No. 159: 2030 West 135th Street, which is located approximately 0.59 miles west of the site. The station is equipped with one fire truck and three four personnel, including a fire captain, an engineer, and a firefighter paramedic (City of Gardena 2022).
The Project Site is already within the LACFD service area, and once operational, would continue to be served by LACFD. Additionally, as discussed in Section 2.4.14(a), Population and Housing, the Project would not induce substantial population growth in the City. The Proposed Project would not result in the construction of new or physically altered fire facilities. Service to the Project site by LACFD occurs under existing conditions. The continuation of industrial uses within the Project site would not incrementally increase the demand for fire protection or emergency medical services to the site. Overall, it is anticipated that the Project would be adequately served by existing LACFD facilities, equipment, and personnel. Therefore, impacts would be less than significant.
Gardena Industrial Center Project IS/MND 91 March 2023
Police protection?
Less Than Significant Impact. Police protection services in the City are provided by the Gardena Police Department (PD) (City of Gardena 2022). The PD operates out of the Civic Center: 1718 West 162nd Street, which is located roughly 1.7 miles south of the Project Site.
The Project Site is already within the PD service area, and once operational, the Project would continue to be served by the PD. As previously mentioned, the Project would not induce substantial population growth in the City. The continuation of industrial uses to the Project site would not incrementally increase the demand for police protection services to the site. Overall, it is anticipated that the Project would be adequately served by existing PD facilities, equipment, and personnel. Therefore, impacts would be less than significant.
Schools?
Less Than Significant Impact. Education in the City is provided by the Los Angeles Unified School District (LAUSD). As previously mentioned, the Proposed Project would not induce substantial population growth in the City. As such, a significant increase in school-age children requiring public education is not expected to occur, and there would be no need for the development of additional schools. Therefore, the Proposed Project would result in less-than-significant impacts associated with the construction or expansion of school facilities.
Parks?
Less Than Significant Impact. As previously mentioned, the Proposed Project would not induce substantial population growth in the City. As such, an increase in patronage at park facilities is not expected. In addition, the number of residents visiting existing parks would be minimal. Therefore, the Proposed Project would result in less-than-significant impacts associated with the construction or expansion of park facilities.
Other public facilities?
Less Than Significant Impact. As previously mentioned, the Proposed Project would not induce substantial population growth in the City. As such, a substantial increase in patronage at libraries, community centers, and other public facilities is not expected. Therefore, the Proposed Project would result in less-than-significant impacts associated with the construction or expansion of public facilities.
Gardena Industrial Center Project IS/MND 92 March 2023
2.4.16 Recreation
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the facility would occur or be accelerated?
☐ ☐ ☒ ☐
b. Does the project include recreational facilities or
require the construction or expansion of recreational
facilities which might have an adverse physical effect
on the environment?
☐ ☐ ☒ ☐
Impact Analysis
a. Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
Less Than Significant Impact. As discussed in Section 2.4.14(a), the Proposed Project would not induce substantial population growth in the City. As such, the Proposed Project would not increase the use of existing parks and recreational facilities such that substantial physical deterioration of recreational facilities would occur or be accelerated. Additionally, due to the anticipated limited number of construction personnel, short-term impacts to local recreational facilities would not occur. Therefore, substantial physical deterioration of these facilities would not occur or be accelerated with implementation of the Proposed Project, and the Project would result in less-thansignificant impacts. b. Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? Less Than Significant Impact. The Proposed Project would not induce substantial population growth in the City. Thus, the Project would not increase the demand for recreational facilities.
Additionally, the Project would not promote or indirectly induce new development that would require the construction or expansion of recreational facilities. Therefore, impacts would be less than significant.
Gardena Industrial Center Project IS/MND 93 March 2023
2.4.17 Transportation
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Conflict with a program, plan, ordinance or policy
addressing the circulation system, including transit,
roadway, bicycle and pedestrian facilities?
☐ ☐ ☒ ☐
b. Conflict or be inconsistent with CEQA Guidelines
section 15064.3, subdivision (b)?
☐ ☐ ☒ ☐
c. Substantially increase hazards due to a
geometric design feature (e.g., sharp curves or
dangerous intersections) or incompatible uses
(e.g., farm equipment)?
☐ ☐ ☐ ☒
d. Result in inadequate emergency access? ☐ ☐ ☒ ☐
Impact Analysis
a. Would the project conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? Less Than Significant Impact. GTrans and LA Metro currently serve the Project Site and the surrounding area. GTrans Line 2 serves the Project Site. GTrans Line 2 circles Western, Imperial Highway, Vermont, Normandie and PCH, taking riders to several important places in the community. The closest stop to the Project Site is located at 13999 S Western Ave, Gardena, CA 90249 approximately 0.6 miles away from the Project Site.
LA Metro Route 209 operates between the Cities of Los Angeles, Inglewood, and West Athens, traveling through the City of Gardena along Normandie Avenue, to the west of the Project site.
Typically, Route 209 operates on weekdays from approximately 5:40 AM to 8:02 PM, with 15- to 25-minute headways. The nearest stop to the Project site is located at Crenshaw Boulevard and 135th Street, approximately 1.3 miles from the Project site. The Project would continue to be served by the existing transit system. The employees that would fill the roles anticipated for the Proposed Project would come from the region and therefore not induce unplanned population growth in the area that would substantially increase the demand for public transit services. The Proposed Project would not conflict with a program plan, ordinance, or policy addressing transit and impacts would be less than significant.
Western Avenue and 135th Street provide access to the Project site. According to the Gardena General Plan, Western Avenue is an arterial roadway. Arterial roadways are the principal urban thoroughfares, provide a linkage between activity centers in the City to adjacent communities and other parts of the region, and prove intra-city mobility. The Project does not propose any changes to Western Avenue.
Gardena Industrial Center Project IS/MND 94 March 2023
There are no bicycle facilities adjacent to the Project site. In December, 2011 the City adopted the South Bay Bicycle Master Plan (Bicycle Master Plan), which is a multi-jurisdictional bicycle master plan intended to guide the development and maintenance of a comprehensive bicycle network and set of programs throughout the cities in the South Bay, including Gardena. There are no bicycle facilities proposed adjacent to the Project site. The Project would not conflict with a program plan, ordinance, or policy addressing bicycle facilities and impacts would be less than significant.
A sidewalk is located adjacent to the Project site along W. 135th Street. The Proposed Project would not remove existing sidewalks or significantly impact pedestrian access or facilities. The Project would not conflict with a program, plan, ordinance or policy addressing pedestrian facilities and impacts would be less than significant.
The Proposed Project will not conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities. Therefore, a less than significant impact would occur.
b. Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)? Less Than Significant Impact. The following analysis was based on the Transportation Screening Analysis: Transportation Assessment for the 1600 West 135th Street Project prepared by Gibson Transportation Consulting, Inc. (Appendix A). Based on review of the ITE land use descriptions, Land Use Code(s) 140 Manufacturing and 710 General Office Building were determined to adequately represent the proposed use and were selected for the analysis. The number of trips forecast to be generated by the Proposed Project is determined by multiplying the trip generation rates and directional distributions by the land use quantity.
As shown in Table 15, Project Trip Generation, the proposed use is forecast to generate approximately 967 daily trips, including the trips generated for both land uses: Manufacturing and General Office Building.
Gardena Industrial Center Project IS/MND 95 March 2023
Table 15. Project Trip Generation
Trip Generation Rates
Land Use Source1 Size2
AM Peak Hour PM Peak Hour Daily
% In % Out Rate % In % Out Rate Rate
Manufacturing ITE 140 per ksf 76% 24% 0.68 31% 69% 0.74 4.75 General Office Building ITE 710 per ksf 88% 12% 1.52 17% 83% 1.44 10.84 Trips Generated
Land Use Source1 Size2
AM Peak Hour PM Peak Hour Daily
In Out Total In Out Total Trips
Manufacturing ITE 140 180.86 ksf 93 30 123 42 92 134 859 General Office Building ITE 710 10 ksf 13 2 15 2 12 14 108 1 Sources: ITE = Institute of Transportation Engineers Trip Generation Manual (11th Edition, 2021); ### = Land Use Code 2 ksf = 1,000 square feet
State of California Senate Bill 743 (Steinberg, 2013) (SB 743) required the Governor’s Office of Planning and Research to change the CEQA guidelines regarding the analysis of transportation impacts. Under SB 743, the focus of transportation analysis shifted from driver delay (level of service [LOS]) to VMT in order to reduce greenhouse gas emissions, create multimodal networks, and promote mixed-use developments.
The City Guidelines define the methodology for analyzing a project’s VMT impacts in accordance with SB 743 and include criteria for screening low VMT generating projects out of a detailed VMT analysis. The City Guidelines include an outline of the procedures for studying a project’s effects on the local transportation system beyond what is required to comply with CEQA under SB 743.
For projects generating less than 20 peak hour trips, a summary of a project’s trip generation and assignment is required, and no cumulative project review or LOS analysis is necessary.
The Project is anticipated to generate 178 fewer daily trips, 21 fewer morning peak hour trips and 18 fewer afternoon peak hour trips than those currently generated by on-site uses. Based on these results, adjacent intersections and roadway segments are anticipated to experience less traffic demand and/or congestion from the Proposed Project uses.
After accounting for the removal of existing uses on site, the Project would result in net negative trip generation. Based on the City Guidelines, the Project satisfies the Project Type Screening criteria by generating fewer than 110 daily trips. As such, the Project would be screened from performing a detailed VMT analysis, and it can be concluded that the Project would result in a less-than-significant VMT impact. Further, the local transportation assessment includes a geometric distribution assignment and demonstrates the Project would result in lessened traffic Gardena Industrial Center Project IS/MND 96 March 2023
demand and/or congestion at adjacent intersections and along roadway segments due to the reduction in overall traffic.
Therefore, the Proposed Project satisfies the City-established screening criteria for non-retail project trip generation screening and may be presumed to result in a less than significant VMT impact. c. Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? No Impact. The Proposed Project consists of constructing a new 190,860-square foot tilt-up concrete creative industrial building. Vehicular access to the site would be provided by two 45- feet wide driveways on West 135th Street. The Proposed Project would not include unusual or hazardous design features, nor would it generate incompatible uses with the surrounding industrial area. The access point has been designed consistently with the City’s circulation standards and does not create a hazard for vehicles, bicycles, or pedestrians entering or exiting the site. Therefore, the Proposed Project would not substantially increase hazards in/around the site and no impact would occur.
d. Would the project result in inadequate emergency access? Less Than Significant Impact. The Project Site comprises of 8.46-acres in the City. During construction, surrounding roadways would continue to provide emergency access through the Project Site and to surrounding properties. Further, the Project would provide emergency access in accordance with the requirements of the Los Angeles County Fire Department. Therefore, the Proposed Project would not result in inadequate emergency access.
Gardena Industrial Center Project IS/MND 97 March 2023
2.4.18 Tribal Cultural Resources
Would the project:
Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Cause a substantial adverse change in the
significance of a tribal cultural resource, defined in
Public Resources Code section 21074 as either a
site, feature, place, cultural landscape that is
geographically defined in terms of the size and
scope of the landscape, sacred place, or object
with cultural value to a California Native American
tribe, and that is:
i. Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in
Public Resources Code section 5020.1(k), or
☐ ☒ ☐ ☐
ii. A resource determined by the lead agency, in
its discretion and supported by substantial
evidence, to be significant pursuant to criteria
set forth in subdivision (c) of Public Resources
Code Section 5024.1? In applying the criteria
set forth in subdivision (c) of Public Resource
Code Section 5024.1, the lead agency shall
consider the significance of the resource to a
California Native American tribe.
☐ ☒ ☐ ☐
Impact Analysis
a. Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
Impact Analysis
a. Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or Less Than Significant Impact with Mitigation. Section 21074 defines tribal cultural resources (TCR) as sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that is included or determined eligible for inclusion in the Gardena Industrial Center Project IS/MND 98 March 2023
California Register of Historical Resources or a local register, or that has been determined to be a TCR by the lead agency, in its discretion and supported by substantial evidence.
A significant impact may occur if a project were to cause a substantial adverse change in the significance of a Tribal cultural resource listed or eligible for listing in the California Register of Historical Resources (CRHR), or in a local register of historical resources as defined in California Public Resources Code, Section 5020.1(k).
The Project Site is currently occupied by an aerospace manufacturing company. The Project Site is located in a highly urbanized and developed part of the City, and is completely developed. The City of Gardena (City) initiated tribal outreach efforts for the purposes of AB-52 consultation on June 1, 2022. The Gabrieleño Band of Mission Indians – Kizh Nation requested consultation and the City met with them on June 9, 2022. Although no Native American tribal cultural resources are known to occur within the Project site, based on the Gabrieleño Band of Mission Indians – Kizh Nation’s cultural affiliation with the area and the findings of the Cultural Resources Assessment, the parties agreed to impose mitigation measures to mitigate potential impacts to previously unidentified Native American tribal cultural resources.
As such, the Project Site would not be eligible for listing in the National Register of Historic Places or CRHR, and thus, would not be considered a historical resource as defined by CEQA. Mitigation Measure TCR-1 will be implemented, however, to assure that impacts remain less than significant. ii. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1? In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.
Less Than Significant Impact with Mitigation. No resources have been identified onsite or within the vicinity of the Project Site and surrounding area pursuant to criteria set forth in subdivision (c) of Public Resources Code, Section 5024.1. However, Mitigation Measure TCR-2 and TCR-3 will be implemented to assure impacts remain less than significant. As required by AB 52 (Public Resources Code, Section 21080.3.1 et seq.), the City notified all Native American tribes provided by the California Native American Heritage Commission (NAHC) and on the City’s AB 52 tribal consultation list of the Project, inviting the tribes to consult on the Project. The City has received one response from the Gabrieleño Band of Mission Indians – Kizh Nation, who requested the following mitigation measures.
Gardena Industrial Center Project IS/MND 99 March 2023
Mitigation Measures
Mitigation Measure TCR-1: Prior to issuance of a grading permit, the applicant shall retain a Native American Monitor Prior to Commencement of Ground-Disturbing Activities:
A. The project applicant shall retain a Native American Monitor from or approved by the Gabrieleño Band of Mission Indians – Kizh Nation. The monitor shall be retained prior to the commencement of any “ground-disturbing activity” for the subject project at all project locations (i.e., both on-site and any off-site locations that are included in the project description/definition and/or required in connection with the project, such as public improvement work). “Grounddisturbing activity” shall include, but is not limited to, demolition, pavement removal, potholing, auguring, grubbing, tree removal, boring, grading, excavation, drilling, and trenching.
B. A copy of the executed monitoring agreement shall be submitted to the lead agency prior to the earlier of the commencement of any ground-disturbing activity, or the issuance of any permit necessary to commence a ground-disturbing activity.
C. The monitor will complete daily monitoring logs that will provide descriptions of the relevant ground-disturbing activities, the type of construction activities performed, locations of grounddisturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe. Monitor logs will identify and describe any discovered TCRs, including but not limited to, Native American cultural and historical artifacts, remains, places of significance, etc., (collectively, tribal cultural resources, or “TCR”), as well as any discovered Native American (ancestral) human remains and burial goods. Copies of monitor logs will be provided to the project applicant/lead agency upon written request to the Tribe.
D. On-site tribal monitoring shall conclude upon the latter of the following (1) written confirmation to the Kizh from a designated point of contact for the project applicant/lead agency that all ground-disturbing activities and phases that may involve ground-disturbing activities on the project site or in connection with the project are complete; or (2) a determination and written notification by the Kizh to the project applicant/lead agency that no future, planned construction activity and/or development/construction phase at the project site possesses the potential to impact Kizh TCRs.
E. Upon discovery of any TCRs, all construction activities in the immediate vicinity of the discovery shall cease (i.e., not less than the surrounding 50 feet) and shall not resume until the discovered TCR has been fully assessed by the Kizh monitor and/or Kizh archaeologist. The Kizh will recover and retain all discovered TCRs in the form and/or manner the Tribe deems appropriate, in the Tribe’s sole discretion, and for any purpose the Tribe deems appropriate, including for educational, cultural and/or historic purposes.
Gardena Industrial Center Project IS/MND 100 March 2023 Mitigation Measure TCR-2: Prior to issuance of grading permit, the following notes shall be listed on the grading plans for the project:
Unanticipated Discovery of Human Remains and Associated Funerary Objects A. Native American human remains are defined in PRC 5097.98 (d)(1) as an inhumation or cremation, and in any state of decomposition or skeletal completeness. Funerary objects, called associated grave goods in Public Resources Code, Section 5097.98, are also to be treated according to this statute.
B. If Native American human remains and/or grave goods discovered or recognized on the project site, then all construction activities shall immediately cease. Health and Safety Code, Section 7050.5, dictates that any discoveries of human skeletal material shall be immediately reported to the County Coroner and all ground-disturbing activities shall immediately halt and shall remain halted until the coroner has determined the nature of the remains. If the coroner recognizes the human remains to be those of a Native American or has reason to believe they are Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission, and Public Resources Code, Section 5097.98, shall be followed.
C. Human remains and grave/burial goods shall be treated alike per California Public Resources Code, Section 5097.98(d)(1) and (2).
D. Construction activities may resume in other parts of the project site at a minimum of 200 feet away from discovered human remains and/or burial goods, if the Kizh determines in its sole discretion that resuming construction activities at that distance is acceptable and provides the project manager express consent of that determination (along with any other mitigation measures the Kizh monitor and/or archaeologist deems necessary). (CEQA Guidelines Section 15064.5(f).) E. Preservation in place (i.e., avoidance) is the preferred manner of treatment for discovered human remains and/or burial goods.
F. Any discovery of human remains/burial goods shall be kept confidential to prevent further disturbance.
Gardena Industrial Center Project IS/MND 101 March 2023 Mitigation Measure TCR-3: Prior to issuance of grading permit, the following notes shall be listed on the grading plans for the project:
Procedures for Burials and Funerary Remains
A. As the Most Likely Descendant (“MLD”), the Koo-nas-gna Burial Policy shall be implemented. To the Tribe, the term “human remains” encompasses more than human bones. In ancient as well as historic times, Tribal Traditions included, but were not limited to, the preparation of the soil for burial, the burial of funerary objects with the deceased, and the ceremonial burning of human remains.
B. If the discovery of human remains includes four or more burials, the discovery location shall be treated as a cemetery and a separate treatment plan shall be created.
C. The prepared soil and cremation soils are to be treated in the same manner as bone fragments that remain intact. Associated funerary objects are objects that, as part of the death rite or ceremony of a culture, are reasonably believed to have been placed with individual human remains either at the time of death or later; other items made exclusively for burial purposes or to contain human remains can also be considered as associated funerary objects. Cremations will either be removed in bulk or by means as necessary to ensure complete recovery of all sacred materials.
D. In the case where discovered human remains cannot be fully documented and recovered on the same day, the remains will be covered with muslin cloth and a steel plate that can be moved by heavy equipment placed over the excavation opening to protect the remains. If this type of steel plate is not available, a 24-hour guard should be posted outside of working hours. The Tribe will make every effort to recommend diverting the project and keeping the remains in situ and protected. If the project cannot be diverted, it may be determined that burials will be removed.
E. In the event preservation in place is not possible despite good faith efforts by the project applicant/developer and/or landowner, before ground-disturbing activities may resume on the project site, the landowner shall arrange a designated site location within the footprint of the project for the respectful reburial of the human remains and/or ceremonial objects.
F. Each occurrence of human remains and associated funerary objects will be stored using opaque cloth bags. All human remains, funerary objects, sacred objects and objects of cultural patrimony will be removed to a secure container on site if possible. These items should be retained and reburied within six months of recovery. The site of reburial/repatriation shall be on the project site but at a location agreed upon between the Tribe and the landowner at a site to be protected in perpetuity. There shall be no publicity regarding any cultural materials recovered.
G. The Tribe will work closely with the project’s qualified archaeologist to ensure that the excavation is treated carefully, ethically and respectfully. If data recovery is approved by the Gardena Industrial Center Project IS/MND 102 March 2023 Tribe, documentation shall be prepared and shall include (at a minimum) detailed descriptive notes and sketches. All data recovery data recovery-related forms of documentation shall be approved in advance by the Tribe. If any data recovery is performed, once complete, a final report shall be submitted to the Tribe and the NAHC. The Tribe does not authorize any scientific study or the utilization of any invasive and/or destructive diagnostics on human remains.
Gardena Industrial Center Project IS/MND 103 March 2023
2.4.19 Utilities and Service Systems
Would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Require or result in the relocation or construction of new or expanded water, wastewater treatment or
storm water drainage, electric power, natural gas,
or telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
☐ ☐ ☒ ☐
b. Have sufficient water supplies available to serve the project and reasonably foreseeable future development
during normal, dry and multiple dry years?
☐ ☐ ☒ ☐
c. Result in a determination by the wastewater
treatment provider which serves or may serve the
project that it has adequate capacity to serve the
project’s projected demand in addition to the
provider’s existing commitments?
☐ ☐ ☒ ☐
d. Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of
solid waste reduction goals?
☐ ☐ ☒ ☐
e. Comply with federal, state, and local management
and reduction statutes and regulations related to
solid waste?
☐ ☐ ☒ ☐
Impact Analysis
a. Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
Less Than Significant Impact. The Proposed Project would not require or result in the relocation or construction of new or expanded water, wastewater treatment, storm water drainage, electric power, natural gas, or telecommunication facilities for the reasons discussed below.
Water Facilities
The Project involves the construction of a new 190,860-square foot tilt-up concrete creative industrial building, in replacement of existing industrial uses. Therefore, water demand for the Proposed Project would be comparable to existing demand at the Project Site. Additionally, as discussed in Section
2.4.14, Population and Housing, the Proposed Project would not result in a significant population increase for the City as the Proposed Project is not introducing new residential uses. The Proposed Project’s nominal contribution to the total water demand could be served by existing water facilities serving the project area without requiring new or expanded facilities. Table 16, Multiple-Dry Years Gardena Industrial Center Project IS/MND 104 March 2023 Supply and Demand Comparison (DWR Table 7-4W), in the Urban Water Management Plan for the West Basin Municipal Water District indicates water supplies would meet the service area’s water demands for normal, single-dry, and multiple dry-year conditions through 2045.
Table 16. Multiple-Dry Years Supply and Demand Comparison (DWR Table 7-4W) 2025 2030 2035 2040 2045
First Year Supply Totals 146,190 150,160 160,450 165,660 165,760 Demand Totals 146,190 150,160 160,450 165,660 165,760
Difference 0 0 0 0 0
Second Year Supply Totals 146,190 150,160 160,450 165,660 165,760 Demand Totals 146,190 150,160 160,450 165,660 165,760
Difference 0 0 0 0 0
Third Year Supply Totals 146,190 150,160 160,450 165,660 165,760 Demand Totals 146,190 150,160 160,450 165,660 165,760
Difference 0 0 0 0 0
Fourth Year Supply Totals 146,190 150,160 160,450 165,660 165,760 Demand Totals 146,190 150,160 160,450 165,660 165,760
Difference 0 0 0 0 0
Fifth Year Supply Totals 146,190 150,160 160,450 165,660 165,760 Demand Totals 146,190 150,160 160,450 165,660 165,760
Difference 0 0 0 0 0
Source: West Basin Municipal Water District, 2020 Urban Water Management Plan Notes: Units are in AFY
The Proposed Project also includes the construction of low impact development (LID) stormwater management systems. LID is an approach to stormwater management that mimics a site’s natural hydrology as the landscape is developed. Stormwater is managed on-site and the rate and volume of predevelopment stormwater reaching receiving waters is unchanged. Additionally, according to the City of Gardena’s General Plan, industrial uses create 240 gallons per 1,000 square feet. The existing building space proposed for demolition totals 296,630 square feet of industrial uses, using approximately 71,191 gallons per day of water. As the Proposed Project includes the construction of a 190,860 industrial warehouse building, it would consume approximately 45,806 gallons per day of water. This would result in a net reduction of approximately 25,385 gallons per day of water compared to the existing use. The Proposed Project would also comply with the California Green Building Standards Code (CALGreen) which includes requirements for residential and nonresidential uses which would further reduce water usage compared to existing use. The nonresidential provisions of the 2019 CALGreen Code outline planning, design and development methods that include environmentally responsible site selection, building design, building siting and development to protect, restore and enhance the environmental quality of the site and respect the integrity of adjacent properties; establishes the means of conserving water used indoors, outdoors and in wastewater conveyance; outlines means of achieving material conservation and Gardena Industrial Center Project IS/MND 105 March 2023 resource efficiency; and outlines means of reducing the quantity of air contaminants. Thus, impacts associated with the construction or expansion of water facilities would be less than significant.
Wastewater Treatment Facilities
The wastewater generated by the proposed project would be treated at the Districts’ Joint Water Pollution Control Plant (JWPCP) located in the City of Carson, which has a capacity of 400 million gallons per day (mgd) and currently processes an average flow of 243.1 mgd. The JWPCP currently provides primary and secondary treatment only. (LACSD 2022) Wastewater generated at the Project Site would be treated at the Hyperion Water Reclamation Plant (Hyperion), which is owned and operated by Sanitation Districts of Los Angeles County. Hyperion provides primary, secondary, and tertiary treatment for an estimated 275 million gallons per day (Los Angeles County Sanitation Districts (LACSD) 2021). Wastewater generated by the Project would represent only a nominal percentage of the Hyperion average dry-weather flow capacity and average wastewater flow. According to the City of Gardena’s General Plan, industrial uses create 200 gallons of wastewater per 1,000 square feet. The existing building space proposed for demolition totals 296,630 square feet of industrial uses, generating approximately 59,326 gallons of wastewater per day. As the Proposed Project includes the construction of a 190,860 industrial warehouse building, it would generate approximately 38,172 gallons of wastewater per day. This would result in a net reduction of approximately 21,154 gallons of wastewater per day compared to existing use. As mentioned above, the Proposed Project would also comply with the California Green Building Standards Code (CALGreen) which would further reduce wastewater when compared to existing use. The non-residential provisions of the 2019 CALGreen Code outline planning, design and development methods including for wastewater conveyance. Thus, the Proposed Project would not require or result in relocation or construction of wastewater facilities, the construction or relocation of which could cause significant environmental effects. Therefore, impacts associated with wastewater treatment facilities would be less than significant.
Stormwater Drainage Facilities
The Proposed Project is located on level or gently sloping topography and is surrounded by urban land uses. The Project is not anticipated to substantially modify existing topography or runoff patterns.
Also, the Proposed Project includes the construction of low impact development (LID) stormwater management systems. LID is an approach to stormwater management that mimics a site’s natural hydrology as the landscape is developed. Stormwater is managed on-site and the rate and volume of predevelopment stormwater reaching receiving waters is unchanged. Therefore, impacts associated with stormwater drainage facilities would be less than significant.
Electric Power Facilities
Electrical energy is accessed by transmission and distribution lines from substations owned by SCE. At full buildout, the Project’s operational phase would require electricity for building Gardena Industrial Center Project IS/MND 106 March 2023 operation (appliances, lighting, etc.). In addition, the project would be required to comply with the 2019 Title 24 standards or the most recent standards at the time of building permit issuance. The energy-using fixtures within the project would likely be newer technologies, using less electrical power. Additionally, as discussed in Section 2.4.6, Energy, previously, the Proposed Project would result in a net decrease in electricity use totaling 228,339 kWh/yr. Therefore, no new or expanded facilities would be required and impacts associated with electrical power facilities would be less than significant.
Natural Gas Facilities
Natural gas is provided to the City by Southern California Gas Company, Pacific Region. As mentioned in the General Plan, natural gas is imported by the Southern California Gas Company from its interstate system. (City of Gardena 2022). The Project would result in a net increase in natural gas use from 192 MT CO2e to 206 MT CO2e, for a net natural gas use of 14 MT CO2e, as indicated in Table 17, Existing and Project Natural Gas Use, below.
Table 17. Existing and Project Natural Gas Use
Scenario GHG Emissions (MT CO2e) KBTU/yr
Existing 192 3,575,859
Proposed Project 206 3,754,650
Net Natural Gas Use 14 178,791
The net increase in natural gas would likely be less than demonstrated in Table 4 of the Energy Memo (see Appendix D) because the CalEEMod modeling does not take into account that the Project would be subject to more stringent Title 24 Building Energy Efficiency Standards compared to the existing buildings. Therefore, no new or expanded facilities would be required and impacts related to natural gas would be less than significant.
Telecommunications Facilities
The City of Gardena is served by multiple telecommunications service providers. Since the Project Site is in an urbanized area and is surrounded primarily by industrial uses, there are existing telecommunication facilities that would be able to serve the Project Site. Telecommunication services are provided by a variety of companies and are typically selected by the individual customer.
Transmission lines/infrastructure for these services are provided within the Project Site. The Proposed Project would not require or result in the relocation or construction of telecommunication facilities.
Therefore, impacts would be less than significant.
b. Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years? Less Than Significant Impact. The City of Gardena, including the Project Site, receives water from Golden State Water Company (GSWC). This City is located within the GSWC’s Southwest Gardena Industrial Center Project IS/MND 107 March 2023 Customer Service Area, which serves approximately 55,000 customers. Water delivered to the Southwest System is a blend of groundwater pumped from the West and Central Coast Groundwater Basins and imported water from the Colorado River Aqueduct and State Water Project (imported and distributed by Metropolitan Water District of Southern California).
According to the Golden State Water Company, the Southwest Water System is a blend of groundwater pumped from the West and Central Coast Groundwater Basins and imported water from the Colorado River Aqueduct and State Water Project (imported and distributed by Metropolitan Water District of Southern California) (Golden State Water Company 2022).
Additionally, GSWC has entitlement of groundwater resources in the West and Central Coast Groundwater Basins. GSWC also leases additional water rights from entities that no longer pump groundwater but have entitlements, in the attempt to meet the increase in water demand from its service area. As such, GSWC currently has no immediate concern with the availability of water supply to the City. The City’s water demands can be met under multiple-dry years, and because supply would meet projected demand due to diversified supply and conservation measures and because the Proposed Project would not result in a significant increase in population, the project’s water demands would be served by the City’s projected current and future supplies. Additionally, as previously indicated, according to the City of Gardena’s General Plan, industrial uses create 240 gallons per 1,000 square feet. As the Proposed Project includes the construction of a 190,860 industrial warehouse building, it would generate approximately 45,806.4 gallons per day of water.
The General Plan provided an estimate of 2,288,736 gallons per day of existing water usage with a projected 2,545,584 gallons per day for year 2025. The estimated 45,806.4 gallons per day for the Proposed Project is within this projected increase. c. Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Less Than Significant Impact. A significant impact would occur if the wastewater treatment provider indicates that a project would increase wastewater generation to such a degree that the capacity of the facilities currently serving the Project Site would be exceeded. As mentioned in Section 2.4.19(a), wastewater generated at the Project Site would be treated at the Districts’ Joint Water Pollution Control Plant (JWPCP) located in the City of Carson, which has a capacity of 400 million gallons per day (mgd) and currently processes an average flow of 243.1 mgd (LACSD 2022) Hyperion Water Reclamation Plant (Hyperion). Hyperion provides primary, secondary, and tertiary treatment for an estimated 275 million gallons per day (LACSD 2021). Wastewater generated by the Project would represent only a nominal percentage of the LBWRP average dryweather flow capacity and average wastewater flow. As previously mentioned above, the 38,172 gallons per day for the Proposed Project is well within this projected increase indicated in the General Plan the available capacity at the JWPCP. Therefore, impacts associated with wastewater treatment capacity would be less than significant.
Gardena Industrial Center Project IS/MND 108 March 2023 d. Would the project generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less Than Significant Impact. Solid waste disposal services for the City are provided by Waste Resources of Gardena (WRG). Waste from the City is taken to either the American Waste Transfer Station, which is operated by Republic Services of California, LLC (1449 West Rosecrans Avenue) or the Waste Resources Recovery Station, which is operated by Waste Resources Recovery, Inc. (357 West Compton Boulevard). Currently, the City contributes approximately 86,354 tons of waste annually. Approximately 27 percent of waste is recycled through the City’s programs. Commercial land uses are the largest producer of disposable waste, generating approximately 35,194 tons of waste and 9,502 tons of recyclable materials annually. Additionally, the Proposed Project will comply with all federal, state, and local statutes and regulations related to solid waste. All construction debris will be disposed of according to applicable federal, state, and local statutes.
According to the City of Gardena’s General Plan, industrial uses create 8.93 pounds of solid waste per 1,000 square feet. As the Proposed Project includes the construction of a 190,860 industrial warehouse building, it would generate approximately 1,704.38 pounds of solid waste per day. The General Plan provided an estimate of 85,160 pounds per day of existing solid waste for industrial with a projected 84,717 pounds per day for year 2025. The 1,704.38 pounds per day for the Proposed Project is within this projected increase. Therefore, impacts associated with solid waste generation would be less than significant.
e. Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Less Than Significant Impact. See response to 2.4.19(d) above. Additionally, collection, transportation, and disposal of solid waste generated by the Project would comply with all applicable federal, state, and local statutes and regulations. In particular, AB 939, the Integrated Waste Management Act of 1989, requires that at least 50% of solid waste generated by a jurisdiction be diverted from landfill disposal through source reduction, recycling, or composting.
Regional agencies, counties, and cities are required to develop a waste management plan that would achieve a 50% diversion from landfills (California Public Resources Code, Section 40000 et seq.). Therefore, impacts associated with solid waste reduction would be less than significant.
Gardena Industrial Center Project IS/MND 109 March 2023
2.4.20 Wildfire
If located in or near state responsibility areas or
lands classified as very high fire hazard severity
zones, would the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Substantially impair an adopted emergency
response plan or emergency evacuation plan?
☐ ☐ ☐ ☒
b. Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose
project occupants to, pollutant concentrations from
a wildfire or the uncontrolled spread of a wildfire?
☐ ☐ ☐ ☒
c. Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency
water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
☐ ☐ ☐ ☒
d. Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
☐ ☐ ☐ ☒
Impact Analysis
a. Would the project substantially impair an adopted emergency response plan or emergency evacuation plan?
No Impact. As mentioned in the City’s Community Safety Element – Public Safety Plan, the Project would be required to comply with the City’s Emergency Operations Plan, adopted in 2017. The plan provides a strategy for the City’s planned response to emergency situations. The City’s Community Safety Element – Public Safety Plan shows emergency routes for the City (City of Gardena 2022). The Project would be provided emergency access along West 135th Street and South Western Avenue. The Project Site is also provided regional access via I-110, I-105, and I405, as well as SR-91 and SR-107. Due to the Proposed Project’s local and regional connectivity, in the unlikely event of an emergency, the Project -adjacent roadway facilities would be expected to serve as emergency evacuation routes for first responders and residents. The Project would not adversely affect operations on the local or regional circulation system, and as such, would not influence the use of these facilities as emergency response routes. Therefore, there would be no impacts associated with an emergency response plan.
b. Would the project, due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
No Impact. The Project Site is not on a slope that would expose project occupants to pollutant concentrations from wildfire. Additionally, according to the California Department of Forestry and Fire Protection’s (CAL FIRE’s) Fire Hazard Severity Zone Map of the County (2020), the Proposed Gardena Industrial Center Project IS/MND 110 March 2023 Projects is not located in a Very High Fire Hazard Safety Zone. Therefore, the development of the Proposed Project would not expose people or structures to a significant risk from wildland fires. c. Would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? No Impact. The Proposed Project does not involve the installation of new infrastructure that would exacerbate fire risk. In addition, the Project Site is not in or immediately near state responsibility areas or lands classified as Very High Hazard Severity Zones according to CAL FIRE’s California Fire Hazard Severity Zone Maps (2021). Therefore, the development of the Proposed Project would not result in temporary or ongoing impacts to the environment. d. Would the project expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes?
No Impact. The Proposed Project is not in an area that is susceptible to flooding or landslides. In addition, the Project Site is not in or immediately near state responsibility areas or lands classified as Very High Hazard Severity Zones according to CAL FIRE’s California Fire Hazard Severity Zone Maps (2021). Therefore, the development of the Proposed Project would expose people or structures to significant risks.
Gardena Industrial Center Project IS/MND 111 March 2023
2.4.21 Mandatory Findings of Significance
Does the project:
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a. Have the potential to substantially degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or
wildlife population to drop below self-sustaining
levels, threaten to eliminate a plant or animal
community, substantially reduce the number or
restrict the range of a rare or endangered plant or
animal or eliminate important examples of the
major periods of California history or prehistory?
☐ ☒ ☐ ☐
b. Have impacts that are individually limited, but
cumulatively considerable? (“Cumulatively
considerable” means that the incremental effects of
a project are considerable when viewed in
connection with the effects of past projects, the
effects of other current projects, and the effects of
probable future projects)?
☐ ☒ ☐ ☐
c. Have environmental effects which will cause
substantial adverse effects on human beings,
either directly or indirectly?
☐ ☐ ☒ ☐
Note: Authority cited: Sections 21083 and 21083.05, Public Resources Code. Reference: Section 65088.4, Gov. Code; Sections 21080(c), 21080.1, 21080.3, 21083, 21083.05, 21083.3, 21093, 21094, 21095, and 21151, Public Resources Code; Sundstrom v.
County of Mendocino,(1988) 202 Cal.App.3d 296; Leonoff v. Monterey Board of Supervisors, (1990) 222 Cal.App.3d 1337; Eureka Citizens for Responsible Govt. v. City of Eureka (2007) 147 Cal.App.4th 357; Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116 Cal.App.4th at 1109; San Franciscans Upholding the Downtown Plan v. City and County of San Francisco (2002) 102 Cal.App.4th 656.
Impact Analysis
a. Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less Than Significant Impact with Mitigation. With implementation of Mitigation Measures TCR1 through TCR-3, the Proposed Project would not degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory.
Gardena Industrial Center Project IS/MND 112 March 2023 b. Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)?
Less Than Significant Impact with Mitigation. As determined in the analysis presented in this IS/MND, with implementation of Mitigation Measures TCR-1 through TCR-3, the Proposed Project would not result in significant impacts in any resources area; therefore, there would be no cumulatively considerable effects.
c. Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
Less Than Significant Impact. As determined in the analysis in this IS/MND, for all resource topics the Project would have no impact or less than significant impacts. Therefore, substantial adverse impacts on human beings would not occur as a result of the Project.
Gardena Industrial Center Project IS/MND 113 March 2023 Section 3 List of Preparers
3.1 Lead Agency
Amanda Acuna, Senior Planner
Community Development Department
1700 West 162nd Street
Gardena, California 90247
310-217-6110
3.2 Consultants
Harris & Associates
22 Executive Park, Suite 200
Irvine, California 92614
William Halligan, Esq., Senior Director/Senior Environmental Counsel Kelsey Hawkins, Associate
Yliana Ortega, Associate
Michael Rupić, Associate
Sharon Toland, Senior Air Quality and Noise Specialist
Lindsey Messner, Technical Editor
Randy Deodat, GIS Analyst
Gardena Industrial Center Project IS/MND 114 March 2023 This page intentionally left blank.
Gardena Industrial Center Project IS/MND 115 March 2023 Section 4 References
California Department of Transportation Division of Transportation Planning. 1997. Transportation Project-Level Carbon Monoxide Protocol. Accessed November 2021. Accessed at https://dot.ca.gov/-/media/dot-media/programs/environmental-analysis/documents/env/coprotocol-searchable-a11y.pdf.
City of Gardena, Gardena General Plan 2006, April 2006.
City of Gardena, Gardena General Plan 2006 Final Environmental Impact Report, SCH# 2005021125, April 2006.
County of Los Angeles, Public Works Department. 2013. County of Los Angeles Traffic Impact Analysis Report Guidelines. Accessed November 2021. Accessed at https://dpw.lacounty. gov/traffic/trafficreportmsg.cfm.
Los Angeles Department of Transportation (LADOT). 2016. Transportation Impact Study Memorandum of Understanding. December Accessed November 2021. Accessed at https://planning.lacity.org/odocument/90d2c25b-476a-40bc-9c14-6bb50c95aa56/ENV-2018- 1651-IS-10.pdf.
SCAG (Southern California Association of Governments. 2016. “Current Context – Demographics & Growth Forecast 2016 RTP/SCS Appendix.” Adopted April 2016. Accessed November 2021. http://scagrtpscs.net/Documents/2016/final/f2016RTPSCS_DemographicsGrowthForecast.pdf.
SCAQMD. 1993. CEQA Air Quality Handbook. Accessed November 2021. http://www.aqmd.gov/home/rulescompliance/ceqa/air-quality-analysis-handbook/ceqa-airquality-handbook-(1993).
SCAQMD (South Coast Air Quality Management District). 2008. “Interim CEQA Greenhouse Gas (GHG) Significance Threshold.” Draft. October. Accessed November 2021. http://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases-(ghg)-ceqasignificance-thresholds/ghgattachmente.pdf.
SCAQMD. 2017. Final 2016 Air Quality Management Plan. March 16, 2017. Accessed November 2021. http://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality-management-plans/ 2016-airquality- management-plan/final-2016-aqmp/final2016aqmp.pdf?sfvrsn=15.
Gardena Industrial Center Project IS/MND 116 March 2023 This page intentionally left blank.
Response to Comments
Gardena Industrial Center Project
Prepared for:
City of Gardena
1700 West 162nd Street
Gardena, California 90247
Contact: Amanda Acuna, Senior Planner
Prepared by:
22 Executive Park, Suite 200
Irvine, California 92614
(949) 655-3900
Contact: William Halligan, Esq., Senior Director/Senior Environmental Counsel February 2023
This page intentionally left blank.
Response to Comments i February 2023
Gardena Industrial Center Project IS/MND
Table of Contents
Section 1 Introduction........................................................................................................1-1
1.1 Introduction .................................................................................................1-1 Section 2 Response to Comments....................................................................................2-1 Tables
Summary of Public Comments.................................................................................................2-1 Appendices
Appendix A. Comment Letter E-1 from Lozeau Drury, LLP on Behalf of Supporters’ Alliance for Environmental Responsibility (SAFER) - Withdrawn
Appendix B. Comment Letter F-1 from Blum Collins & Ho, LLP on Behalf of Golden State Environmental Justice Alliance - Withdrawn
Appendix C. Updated Air Quality Computer Modeling
Response to Comments ii February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 1-1 February 2023
Gardena Industrial Center Project IS/MND
Section 1 Introduction
1.1 Introduction
This document includes a compilation of the public comments received on the Gardena Industrial Center Project Initial Study and Mitigated Negative Declaration (IS/MND) and the City of Gardena (City) responses to the comments.
Under the California Environmental Quality Act (CEQA), a lead agency has no affirmative duty to prepare formal responses to comments on a mitigated negative declaration (MND). The lead agency, however, should have adequate information on the record explaining why the comments do not affect the conclusion of the MND that there are no potentially significant environmental effects. In the spirit of public disclosure and engagement, the City—as the lead agency of Gardena Industrial Center Project—has responded to all written comments submitted during the 30-day MND public review period, which began October 13, 2022 and closed November 14, 2022, as well as an additional comment received on November 30, 2022 from the Los Angeles Regional Water Quality Control Board which was granted an extension to respond.
Response to Comments 1-2 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 2-1 February 2023
Gardena Industrial Center Project IS/MND
Section 2 Response to Comments
This section provides all written responses received on the IS/MND and the City of Gardena’s responses to each comment.
Comment letters and specific comments are given letters and numbers for reference purposes.
Where sections of the IS/MND are excerpted in this document, the sections are shown indented.
Changes to the IS/MND text are shown in underlined text for additions and strikeout for deletions.
The following is a list of agencies and persons that submitted comments on the IS/MND during the public review period.
Summary of Public Comments
No. Reference Commenting Person/Agency Date of Comment Page No.
Public Agencies and Organizations
A South Coast Air Quality Management
District
November 10, 2022 2-3
B Los Angeles County Sanitation Districts November 14, 2022 2-13 C County of Los Angeles Fire Department November 17, 2022 2-17 D Los Angeles Regional Water Quality
Control Board
November 30, 2022 2-21
Residents and Interested Parties
E Lozeau Drury, LLP on Behalf of SAFER –
withdrawal letter
November 16, 2022 2-27
E-1 Lozeau, Drury, LLP on Behalf of SAFER –
(original comment letter withdrawn)
Appendix A
F Blum Collins & Ho, LLP on Behalf of
Golden State Environmental Justice
Alliance – withdrawal letter
January 18, 2023 2-31
F-1 Blum Collins & Ho, LLP on Behalf of
Golden State Environmental Justice
Alliance – (original comment letter
withdrawn)
Appendix B
Response to Comments 2-2 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 2-3 February 2023
Gardena Industrial Center Project IS/MND
Comment Letter A. Sam Wang, Program Supervisor, CEQA-IGR, South Coast Air Quality Management District, November 10, 2022
Response to Comments
2-4 February 2023
Gardena Industrial Center Project IS/MND
Response to Comments
2-5 February 2023
Gardena Industrial Center Project IS/MND
Response to Comments
2-6 February 2023
Gardena Industrial Center Project IS/MND
Response to Comments
2-7 February 2023
Gardena Industrial Center Project IS/MND
Response to Comments 2-8 February 2023
Gardena Industrial Center Project IS/MND
Responses to Letter A. Sam Wang, Program Supervisor, CEQA-IGR, South Coast Air Quality Management District, November 10, 2022
A-1 This comment introduces the letter. It does not include a comment on the adequacy of or accuracy of information in the IS/MND. No additional response is required.
A-2 This comment summarizes project information and identifies sensitive receptor 85 feet from the project site. The comment includes a project description inconsistency. The project proposes a 190,860 square foot building. Additionally, the City and City’s consultant have reviewed the project area. Although the residence was not identified in the comment, it appears SCAQMD is referring to the structures located at 1531 W. 135th Street, across from the Project Site. These structures were built in approximately 1948.
The properties have been boarded up and are fenced off. Residential uses are not allowed in the City’s manufacturing zone and they could not be redeveloped for residential use.
Furthermore, property records indicate that the properties were bought along with the industrial property to the west in 2021. As such, the nearest potentially occupied sensitive receptor distance of 100 meters was correctly, and no changes to the analysis have been made in response to this comment.
A-3 This comment states that the construction air quality analysis should reflect a 25-meter receptor distance and a 1-acre disturbance, based on the receptor identified by the SCAQMD.
Refer to response to comment #A-2. No changes to the analysis have been made in response to this comment.
A-4 This comment states that the construction air quality analysis should reflect a 25-meter receptor distance and a 1-acre disturbance, based on the receptor identified by the SCAQMD.
Refer to response to comment #A-2. 100 meters is the correct sensitive receptor distance for the analysis. No changes to the analysis have been made in response to this comment.
A-5 This comment summarizes the commenters request for the construction emissions analysis be revised to reflect an LSTs receptor distance of 25-meter with a 1-acre disturbance, and to incorporate mitigation measures if necessary. Please see response to comments #A-2. 100 meters is the correct sensitive receptor distance for the analysis. No changes to the analysis have been made in response to this comment.
A-6 This comment states that air quality impacts from implementation of HAZ-1 are not analyzed in the MND and should be included in the air quality analysis or as mitigation requiring future analysis. As stated in the comment, cleanup activities for remediating and controlling contaminated soil may occur prior to or concurrently with the construction of the Proposed Project, and may include further investigation, soil sampling, testing, and preparing a remediation plan before the Proposed Project's redevelopment. Investigation, Response to Comments 2-9 February 2023
Gardena Industrial Center Project IS/MND
sampling, and testing activities would not require the use of heaving construction equipment or vehicle trips beyond what is assumed for typical construction activity based on CalEEMod default construction assumptions for the project. However, additional details regarding soil movement and disposal have been estimated. Implementation of REC No. 5 and REC No. 6 required in mitigation measure HAZ-1 are anticipated to require the removal of 1,533 cubic yards (CY) of soil and require 110 truckloads for disposal. This area contains slightly elevated levels of PCE and would be disposed of as non-hazardous material. The default disposal trip length of 20 miles is assumed for this material. REC No. 4 would result in approximately 55 CY of hazardous materials requiring 4 truckloads that would require disposal at Simi Valley Dump Site, approximately 51 miles from the site. As such, implementation of HAZ-1 would require 228 total truck trips, with an average haul distance of 21.3 miles. The air quality analysis (IS/NND Section 2.4.3.b) has been revised to incorporate this soil movement during the grading phase of construction. Table 4 has been updated to reflect the revised modeling and compare results to South Coast AQMD construction significance thresholds. Construction with implementation of HAZ-1 would not exceed any significance threshold and a new significant impact would not occur. Page 38 of the Draft IS/MND has been revised as follows and the new CalEEMod model runs are included in Appendix C:
Construction
Project construction emissions were estimated using the California Emissions Estimator Model (CalEEMod), version 2020.4.0, based on construction information provided by the City and model default assumptions. Project construction is anticipated to last for 12 to 14 months, which is consistent with the CalEEMod default schedule assumptions for the Project. A total of 296,630 square feet of existing development on the Project Site would be demolished and hauled away.
Cut and fill would be balanced on site; however, implementation of mitigation measure HAZ-1 below would require soil export, and no import or export is assumed. Implementation of REC No. 5 and REC No. 6 are anticipated to require the removal of 1,533 cubic yards (CY) of soil and require 110 truckloads for disposal. This area contains slightly elevated levels of PCE and would be disposed of as non-hazardous material. The default disposal trip length of 20 miles is assumed for this material. REC No. 4 would result in approximately 55 CY of hazardous materials requiring 4 truckloads that would require disposal at Simi Valley Dump Site, approximately 51 miles from the site. As such, implementation of HAZ-1 would require 228 total truck trips, with an average haul distance of 21.3 miles. Modeling assumes implementation of the SCAQMD Rule 403 for fugitive dust control, which includes the following dust control measures during ground-disturbing activities: replacing ground cover in disturbed areas quickly, watering exposed surfaces at least two times daily, implementing equipment loading/unloading procedures to reduce fugitive dust, managing dust by watering two times daily, and reducing speed on unpaved roads to less than 15 miles per hour.
Response to Comments 2-10 February 2023
Gardena Industrial Center Project IS/MND
Maximum daily emissions levels associated with construction of the Project are shown in Table 4, Estimated Construction Daily Maximum Air Pollutant Emissions (pounds/day). As shown in Table 4, the Project would not exceed SCAQMD construction thresholds for any pollutant. Therefore, the Project would not result in a significant impact related to criteria pollutant emissions during construction. Because emissions of criteria pollutants under the Project would be below applicable thresholds, which are established to assist in maintaining or achieving regional attainment in the SCAB, construction would not result in a cumulatively considerable contribution to regional acute and long-term health impacts related to non-attainment of the ambient air quality standards.
Table 4. Estimated Construction Daily Maximum Air Pollutant Emissions (pounds/day) Construction Phase VOC NOx CO SOx PM10 PM2.5
Demolition 2 2830 22 <1 79 2
Site preparation 3 28 19 <1 10 6
Grading 2 1820 1516 <1 4 2
Building construction and coating 29 18 25 <1 4 1
Paving 2 10 15 <1 1 <1
Maximum Daily Emissions 29 2830 2225 <1 10 6
SCAQMD Threshold 75 100 550 150 150 55
Significant Impact? No No No No No No
Source: CalEEMod, version 2020.4.0. See Attachment 1 for model output (Appendix B, Air Quality Memo).
Notes: CO = carbon monoxide; NOX = oxides of nitrogen; PM10 = particulate matter less than 10 microns; PM2.5 = particulate matter less than 2.5 microns; SOX = oxides of sulfur; VOC = volatile organic compound Emission quantities are rounded to the nearest whole number. Exact values are provided in Attachment 1 (Appendix B).
A-7 This comment request that haul trips from project construction be recalculated to account for the potential soil excavation as a result of mitigation measure HAZ-1. Please see response to comment #A-6. Per your request, additional modeling was completed and showed that even with the addition of off-site haul trips, construction emissions are well below SCAQMD thresholds.
A-8 This comment outlines South Coast AQMD Rules 2305 and Rule 316 as they apply to the proposed project, and requests that these rules be reviewed, and potential project features or mitigation measures be incorporated into the MND. As stated by the commenter, Project operation would be required to apply with all applicable South Coast AQMD rules, including Rule 2305. As demonstrated in Table 5, Operational Daily Maximum Air Pollutant Emissions, Project operational emissions would not exceed the South Coast AQMD thresholds for operation, and additional project features or mitigation is not necessary. However, a reference to Rule 2305 has been added to Page 39 of the Draft IS/MND as follows:
The total estimated and net changes in operational emissions from project implementation are provided in Table 5, Operational Daily Maximum Air Pollutant Emissions. As shown in Table 5, Response to Comments 2-11 February 2023
Gardena Industrial Center Project IS/MND
operational emissions from the Project would not exceed any of the SCAQMD significance thresholds and would result in a net decrease from existing conditions. Additionally, Project operational emissions would be further reduced through compliance with SCAQMD Rule 2305, Warehouse Indirect Source Rule – Warehouse Actions and Investments to Reduce Emissions (WAIRE) Program. Adopted in 2021, this rule reduces regional emissions of NOX and PM associated with warehouse operations by requiring warehouse owners to implement emissionsreducing features, such as electric vehicle charging infrastructure, to achieve a required number of points based on annual truck trips. Air quality impacts associated with operation of the Project would be less than significant.
A-9 Comment noted. The project will obtain all necessary stationary source permits in compliance with applicable South Coast AQMD rules.
A-10 The comment outlines CEQA requirements related to response to comments and accordingly requests responses to the above comments, and provides agency contact information. Please refer to the above responses to comments.
Response to Comments 2-12 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 2-13 February 2023
Gardena Industrial Center Project IS/MND
Comment Letter B. Mandy Huffman, Environmental Planner, Los Angeles County Sanitation District, November 14, 2022
Response to Comments
2-14 February 2023
Gardena Industrial Center Project IS/MND
Response to Comments 2-15 February 2023
Gardena Industrial Center Project IS/MND
Response to Comment Letter B. Mandy Huffman, Environmental Planner, Los Angeles County Sanitation District, November 14, 2022
B-1 Per your request, the following revisions have been made to Page 103 of the Draft MND. It should be noted that the changes do not affect the conclusions in the IS/MND.
Wastewater Treatment Facilities
The wastewater generated by the proposed project would be treated at the Districts’ Joint Water Pollution Control Plant (JWPCP) located in the City of Carson, which has a capacity of 400 million gallons per day (mgd) and currently processes an average flow of 243.1 mgd. The JWPCP currently provides primary and secondary treatment only. (LACSD 2022) Wastewater generated at the Project Site would be treated at the Hyperion Water Reclamation Plant (Hyperion), which is owned and operated by Sanitation Districts of Los Angeles County. Hyperion provides primary, secondary, and tertiary treatment for an estimated 275 million gallons per day (Los Angeles County Sanitation Districts (LACSD) 2021). Wastewater generated by the Project would represent only a nominal percentage of the Hyperion average dry-weather flow capacity and average wastewater flow. According to the City of Gardena’s General Plan, industrial uses create 200 gallons of wastewater per 1,000 square feet. The existing building space proposed for demolition totals 296,630 square feet of industrial uses, generating approximately 59,326 gallons of wastewater per day. As the Proposed Project includes the construction of a 190,860 industrial warehouse building, it would generate approximately 38,172 gallons of wastewater per day. This would result in a net reduction of approximately 21,154 gallons of wastewater per day compared to existing use. As mentioned above, the Proposed Project would also comply with the California Green Building Standards Code (CALGreen) which would further reduce wastewater when compared to existing use. The non-residential provisions of the 2019 CALGreen Code outline planning, design and development methods including for wastewater conveyance. Thus, the Proposed Project would not require or result in relocation or construction of wastewater facilities, the construction or relocation of which could cause significant environmental effects. Therefore, impacts associated with wastewater treatment facilities would be less than significant.
B-2 Per your request, the following revisions have been made to Page 105 of the Draft MND. It should be noted that the changes do not affect the conclusions in the IS/MND.
Less Than Significant Impact. A significant impact would occur if the wastewater treatment provider indicates that a project would increase wastewater generation to Response to Comments 2-16 February 2023
Gardena Industrial Center Project IS/MND
such a degree that the capacity of the facilities currently serving the Project Site would be exceeded. As mentioned in Section 2.4.19(a), wastewater generated at the Project Site would be treated at the Districts’ Joint Water Pollution Control Plant (JWPCP) located in the City of Carson, which has a capacity of 400 million gallons per day (mgd) and currently processes an average flow of 243.1 mgd (LACSD 2022) Hyperion Water Reclamation Plant (Hyperion). Hyperion provides primary, secondary, and tertiary treatment for an estimated 275 million gallons per day (LACSD 2021). Wastewater generated by the Project would represent only a nominal percentage of the LBWRP average dry-weather flow capacity and average wastewater flow. As previously mentioned above, the 38,172 gallons per day for the Proposed Project is well within this projected increase indicated in the General Plan the available capacity at the JWPCP. Therefore, impacts associated with wastewater treatment capacity would be less than significant.
B-3 Comment noted. The project applicant will be required to obtain all Industrial Wastewater Discharge permits from the LACSD, if necessary. The comment does not address the adequacy of or accuracy of information in the IS/MND. No additional response is required.
B-4 Comment noted. The project applicant will be required to pay sewer connection fees if Industrial Wastewater Discharge permits are required from the LACSD. The comment does not address the adequacy of or accuracy of information in the IS/MND. No additional response is required.
B-5 Comment noted. The proposed project replaces an existing industrial building with a smaller industrial building. As a result, the proposed project is consistent with SCAG’s regional growth forecasts.
Response to Comments 2-17 February 2023
Gardena Industrial Center Project IS/MND
Comment Letter C. Ronald M. Durbin, Chief, Forestry Division Prevention Services Bureau, Los Angeles County Fire Department, November 17, 2022 Response to Comments
2-18 February 2023
Gardena Industrial Center Project IS/MND
Response to Comments 2-19 February 2023
Gardena Industrial Center Project IS/MND
Response to Comment Letter C. Ronald M. Durbin, Chief, Forestry Division Prevention Services Bureau, Los Angeles County Fire Department, November 17, 2022
C-1 Per your request, the following revisions have been made to Section 2.4.15 of the Draft MND:
Fire protection?
Less Than Significant Impact. Fire protection and emergency medical response services in the City are provided by the Los Angeles County Fire Department (LACFD). The LACFD provides service to over 60 58 cities and unincorporated areas throughout the County. The Project Site is served by Fire Station No. 159: 2030 West 135th Street, which is located approximately 0.59 miles west of the site. The station is equipped with one fire truck and three four personnel, including a fire captain, an engineer, and a firefighter paramedic (City of Gardena 2022).
C-2 Comment noted. The comment does not address the adequacy of or accuracy of information in the IS/MND. No additional response is required.
C-3 Comment noted. The comment does not address the adequacy of or accuracy of information in the IS/MND. No additional response is required.
C-4 Comment noted. The comment does not address the adequacy of or accuracy of information in the IS/MND. No additional response is required.
Response to Comments 2-20 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 2-21 February 2023
Gardena Industrial Center Project IS/MND
Comment Letter D. Renee Purdy, Executive Officer, Los Angeles Regional Water Quality Control Board, November 30, 2022
Response to Comments
2-22 February 2023
Gardena Industrial Center Project IS/MND
Response to Comments
2-23 February 2023
Gardena Industrial Center Project IS/MND
Response to Comments 2-24 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 2-25 February 2023
Gardena Industrial Center Project IS/MND
Response to Comment Letter D. Renee Purdy, Executive Officer, Los Angeles Regional Water Quality Control Board, November 30, 2022 D-1 Per your request, ENERCON, on behalf of the Project Applicant, will upload the previous environmental reports including the previous Phase I ESA and Subsurface Investigation.
D-2 The site-specific CSM is under internal review by Gardena Owner LP and will be presented to the LARWQCB soon. Remediation of shallow soils will be completed during redevelopment for the protection of workers. Deeper soils will be remediated by the responsible party at a later date. Regarding the recommendations presented above, ENERCON, the environmental consultant for the applicant, has clarified that indoor air sampling has already been completed at the site including in existing Building 25, the results of which are presented in the draft Vapor Intrusion Evaluation Report by Ardent Environmental Group, Inc., dated March 14, 2022. The results of the evaluation indicated that a vapor intrusion concern is not present in Building 25.
D-3 The RAP will be submitted after the LARWQCB presents its review of the CSM. Per your request, Mitigation Measures HAZ-1 has been revised as follows:
Mitigation Measure HAZ-1: Prior to the issuance of building permits, the Project Applicant shall prepare and implement a Remedial Action Plan or other remedial cleanup program reviewed and approved by LARWQCB (collectively referred to as the “Final Remedial Cleanup Program”). The LARWQCB may require additional soil, soil vapor, and groundwater investigations prior to submittal of a Final Remedial Cleanup Program. Prior to implementation, the RAP shall be reviewed and approved by the LARWQCB. The Final Remedial Cleanup Program RAP will present the results of the previous work and present a scope of work to remediate shallow impacted soil that might be encountered during grading and redevelopment activities. The Project Applicant shall provide a copy of the Final Remedial Cleanup Program RAP to the City once it has been reviewed and approved by the LARWQCB with confirmation of approval.
At a minimum, the Final Remedial Cleanup Program RAP should present the scope of work and schedule to excavate and remove onsite VOC-impacted soil associated with REC Nos. 4, 5, and 6 so grading and redevelopment can commence. The results of the remedial efforts shall be documented in a report that will be submitted to the LARWQCB.
Prior to issuance of grading permits, a Soil Management Plan (SMP) shall be submitted to the City which shall identify the procedures to manage unknown environmental concerns that might be encountered during redevelopment. This document shall also be submitted to the LARWQCB. The SMP does not need to be approved by the LARWQCB nor the City.
Response to Comments 2-26 February 2023
Gardena Industrial Center Project IS/MND
A Vapor Intrusion Mitigation System (VIMS) Design Plan shall be prepared that presents the proposed design and construction details of the vapor mitigation system and submitted to the City along with construction documents. A VIMS Performance Plan should accompany the VIMS Design Plan and will present baseline indoor air sampling details that will be collected once the building is constructed. The baseline sampling will provide evidence that the VIMS is performing adequately and that no human health risks are present for site occupancy. The VIMS Performance Plan will include the baseline and startup sampling procedures, on-going performance monitoring, and operation, monitoring, and maintenance (OM&M) operations. The VIMS Performance Plan will also provide contingencies for further mitigation if unfavorable vapor concentrations are discovered. Following completion of these tasks, the Project Applicant will request no further sampling/monitoring be required from the LARWQCB.
Prior to issuance of a temporary or final Certificate of Occupancy, a Land Use Covenant (LUC) shall be recorded with the Los Angeles County Registrar-Recorder restricting the property to be used only for industrial/commercial uses. Proof or recording shall be provided to the City. Prior to recording, the LUC shall be presented to the LARWQCB for review and approval.
D-4 Pursuant to the County’s MS4 Permit Requirements, the Project Applicant shall prepare a preliminary water quality management plan (WQMP). The WQMP will identify Low Impact Development (LID) design strategies for on-site Best Management Practices to lessen the impacts of development on stormwater quality and quantity. The goal of LID is to mimic the undeveloped runoff conditions of the development site with the postdevelopment conditions.
D-5 The proposed building will be developed with a passive vapor intrusion mitigation barrier.
D-6 All remediation activities will be completed with oversight from the LARWQCB.
Response to Comments 2-27 February 2023
Gardena Industrial Center Project IS/MND
Comment Letter E. Adam Frankel, Lozeau Drury, LLP on Behalf of Supporters’ Alliance for Environmental Responsibility (SAFER), November 16, 2022 Response to Comments 2-28 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 2-29 February 2023
Gardena Industrial Center Project IS/MND
Response to Comment Letter E. Adam Frankel, Lozeau Drury, LLP on Behalf of Supporters’ Alliance for Environmental Responsibility (SAFER), November 16, 2022
E-1 Comment noted. While SAFER has withdrawn their original comment letter and no further response required, it is noted that the comment did not provide any evidence of a significant environmental impact.
Response to Comments 2-30 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 2-31 February 2023
Gardena Industrial Center Project IS/MND
Comment Letter F. Blum Collins & Ho, LLP on Behalf of Golden State Environmental Justice Alliance, January 18, 2023
F
F-1
Response to Comments 2-32 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Response to Comments 2-33 February 2023
Gardena Industrial Center Project IS/MND
Response to Comment Letter F. Blum Collins & Ho, LLP on Behalf of Golden State Environmental Justice Alliance, January 18, 2023
F-1 Comment noted. The Environmental Justice Alliance has withdrawn their original comment letter and no further response required. It should be noted that the Proposed Project involves the demolition of all existing on-site industrial buildings, totaling 296,630 square feet of building space, parking lots, and associated improvements. the Proposed Project consists of a new 190,860-square foot tilt-up concrete industrial building, constituting of 180,860 square feet of industrial uses and 10,000 square feet of office uses. As noted in the Draft MND, the reduction in square footage on-site will reduce most operational impacts as compared to the existing condition.
Response to Comments 2-34 February 2023
Gardena Industrial Center Project IS/MND
This page intentionally left blank.
Appendix A. Comment Letter E-1 from Lozeau Drury, LLP on Behalf of Supporters’ Alliance for Environmental Responsibility (SAFER) - Withdrawn
This page intentionally left blank.
Via Email
October 26, 2022
Amanda Acuna, Senior Planner
City of Gardena
Community Development Department
1700 West 162nd Street
Gardena, California 90247
[email protected]
Re: Comment on the Mitigated Negative Declaration (MND) for the Gardena Industrial Center Project
Dear Ms. Acuna:
I am writing on behalf of Supporters Alliance for Environmental Responsibility (“SAFER”) regarding the Initial Study and Mitigated Negative Declaration (“IS/MND”), prepared for the Gardena Industrial Center Project, including all actions related or referring to the proposed construction of a 190,860-square foot tilt-up concrete industrial building located at 1600 W. 135th Street in the City of Gardena (“Project”).
After reviewing the IS/MND, we conclude the IS/MND fails as an informational document, and that there is a fair argument that the Project may have adverse environmental impacts. Therefore, we request that the City of Gardena prepare an environmental impact report (“EIR”) for the Project pursuant to the California Environmental Quality Act (“CEQA”), Public Resources Code (“PRC”) section 21000, et seq.
We reserve the right to supplement these comments during review of the Final EIR for the Project and at public hearings concerning the Project. Galante Vineyards v. Monterey Peninsula Water Management Dist., 60 Cal. App. 4th 1109, 1121 (1997).
Sincerely,
Adam Frankel
This page intentionally left blank.
Appendix B. Comment Letter F-1 from Blum Collins & Ho, LLP on Behalf of Golden State Environmental Justice Alliance - Withdrawn This page intentionally left blank.
BLUM COLLINS & HO, LLP
ATTORNEYS AT LAW
AON CENTER
707 WILSHIRE BOULEVARD
SUITE 4880
LOS ANGELES, CALIFORNIA 90017 (213) 572-
0400
November 11, 2022
Amanda Acuna VIA EMAIL TO:
City of Gardena [email protected]
1700 West 162nd Street
Gardena, CA 90247
SUBJECT: COMMENTS ON GARDENA INDUSTRIAL CENTER PROJECT MND (SCH NO. 2022100279)
Dear Ms. Acuna:
Thank you for the opportunity to comment on the Mitigated Negative Declaration (MND) for the proposed Gardena Industrial Center project. Please accept and consider these comments on behalf of Golden State Environmental Justice Alliance. Also, Golden State Environmental Justice Alliance formally requests to be added to the public interest list regarding any subsequent environmental documents, public notices, public hearings, and notices of determination for this project. Send all communications to Golden State Environmental Justice Alliance P.O. Box 79222 Corona, CA 92877.
1.0 Summary
The project proposes the construction and operation of one 190,860 square foot (sf) industrial building comprised of 180,860 sf of industrial uses and 10,000 sf of office uses on an 8.46 acre site. The proposed building has been designed to accommodate up to two tenants with a wide variety of uses, including light assembly, manufacturing, e-commerce, and warehousing/distribution. The Proposed Project is concurrently applying for a conditional use permit (CUP) for warehousing/distribution and a site plan review (SPR). The building includes 22 truck/trailer loading dock doors and 220 passenger car parking spaces. The proposed project necessitates the demolition of all existing on-site buildings, totaling 296,630 square feet of building space, parking lots, and associated improvements