Cities Index.
Agenda packet

Gilroy City Council
June 29, 2026

Document
Agenda packet
Meeting
June 29, 2026
Body
Gilroy City Council
Pages
256
Original file
67.6 MB
Text extracted from the city's file for reading and search. Open the original on gilroyca.api.civicclerk.com. That file is the official record.

June 29, 2026 | 6:00 PM Page 1 of 4 City Council
Special Meeting

CITY COUNCIL

SPECIAL MEETING AGENDA

CITY COUNCIL CHAMBERS, CITY HALL
7351 ROSANNA STREET, GILROY, CA
95020

AMENDED AGENDA

A CLOSED SESSION ITEM HAS BEEN
ADDED
MONDAY, JUNE 29, 2026 | 6:00 PM
MAYOR
Greg Bozzo

COUNCIL MEMBERS
Dion Bracco
Tom Cline
Terence Fugazzi
Zach Hilton
Carol Marques
Kelly Ramirez
CITY COUNCIL PACKET MATERIALS ARE AVAILABLE ONLINE AT www.cityofgilroy.org AGENDA CLOSING TIME IS 5:00 P.M. THE TUESDAY PRIOR TO THE MEETING

COMMENTS BY THE PUBLIC WILL BE TAKEN ON AGENDA ITEMS BEFORE ACTION IS TAKEN BY THE CITY COUNCIL. Public testimony is subject to reasonable regulations, including but not limited to time restrictions for each individual speaker. **Please limit your comments to 3 minutes.** The amount of time allowed per speaker may vary at the Mayor’s discretion depending on the number of speakers and length of the agenda.

Written comments on any agenda item may be emailed to the City Clerk’s Office at [email protected] or mailed to the Gilroy City Clerk’s Office at City Hall, 7351 Rosanna Street, Gilroy, CA 95020. Comments received by the City Clerk’s Office by 1 p.m. on the day of a Council meeting will be distributed to the City Council prior to or at the meeting and available for public inspection with the agenda packet located in the lobby of Administration at City Hall, 7351 Rosanna Street prior to the meeting. Any correspondence received will be incorporated into the meeting record. Items received after the 1 p.m. deadline will be provided to the City Council as soon as practicable. Written comments are also available on the City’s Public Records Portal at bit.ly/3NuS1IN.

In compliance with the Americans with Disabilities Act, the City will make reasonable arrangements to ensure accessibility to this meeting. If you need special assistance to participate in this meeting, please contact the City Clerk’s Office at least 72 hours prior to the meeting at (408) 846-0204 or [email protected] to help ensure that reasonable arrangements can be made.

If you challenge any planning or land use decision made at this meeting in court, you may be limited to raising only those issues you or someone else raised at the public hearing held at this meeting, or in written correspondence delivered to the City Council at, or prior to, the public hearing. Please take notice that the time within which to seek judicial review of any final administrative determination reached at this meeting is governed by Section 1094.6 of the California Code of Civil Procedure.

A Closed Session may be called during this meeting pursuant to Government Code Section 54956.9 (d)(2) if a point has been reached where, in the opinion of the legislative body of the City on the advice of its legal counsel, based on existing facts and circumstances, there is a significant exposure to litigation against the City.

Materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are available with the agenda packet on the City website at www.cityofgilroy.org subject to the Staff’s ability to

Page 1 of 256 ends

June 29, 2026 | 6:00 PM Page 2 of 4 City Council
Special Meeting
post the documents before the meeting.

KNOW YOUR RIGHTS UNDER THE GILROY OPEN GOVERNMENT ORDINANCE Government's duty is to serve the public, reaching its decisions in full view of the public.

Commissions, task forces, councils and other agencies of the City exist to conduct the people's business. This ordinance assures that deliberations are conducted before the people and that City operations are open to the people's review.

FOR MORE INFORMATION ON YOUR RIGHTS UNDER THE OPEN GOVERNMENT

ORDINANCE, TO RECEIVE A FREE COPY OF THE ORDINANCE OR TO REPORT A

VIOLATION OF THE ORDINANCE, CONTACT THE OPEN GOVERNMENT COMMISSION STAFF AT (408) 846-0204.

If you need assistance with translation and would like to speak during public comment, please contact the City Clerk a minimum of 72 hours prior to the meeting at 408-846-0204 or e-mail the City Clerk’s Office at [email protected].

Si necesita un intérprete durante la junta y gustaría dar un comentario público, comuníquese con el Secretario de la Ciudad un mínimo de 72 horas antes de la junta al 408- 846-0204 o envíe un correo electrónico a la Oficina del Secretario de la Ciudad a [email protected].

To access written translation during the meeting, please scan the QR Code or click this link:

Para acceder a la traducción durante la reunión, por favor escanee el código QR o haga clic en el enlace:
bit.ly/3FBiGA0
Choose Language and Click Attend | Seleccione su lenguaje y haga clic en asistir
Use a headset on your phone for audio or read the transcript on your device.

Use sus auriculares para escuchar el audio o leer la transcripción en el dispositivo.

The agenda for this special meeting is outlined as follows:

1. OPENING

1.1. Call to Order

1.2. Roll Call

1.3. City Clerk's Report on Posting the Agenda

1.4. Employee Introductions

Page 2 of 256 ends

June 29, 2026 | 6:00 PM Page 3 of 4 City Council
Special Meeting

2. CEREMONIAL ITEMS - Proclamations and Awards

2.1. Screen-Free Week Proclamation

3. PUBLIC COMMENT

3.1. Pursuant to the Brown Act, Public Comment Only on Agendized Items at the time those items are heard.

4. CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the City Council to be routine and will be enacted by one motion. There will be no separate discussion of these items unless a request is made by a member of the City Council or a member of the public. Any person desiring to speak on any item on the consent calendar should ask to have that item removed from the consent calendar prior to the time the City Council votes to approve. If removed, the item will be discussed in the order in which it appears.

4.1. Claim of S.S. and A.S., surviving minor children of Andrew Stuart and Stacia Stuart and the Estates of Andrew Stuart and Stacia Stuart

5. BIDS AND PROPOSALS

5.1. Award a Contract to Zumwalt Construction, Inc. for Design-Build Construction Services for the Santa Teresa Fire Station Construction Project for a Total Maximum Project cost of $12,279,555, with a Total Project Construction Cost of $12,051,237 and Project Contingency in the Amount of $228,318, and Adopt a Resolution Amending the Fiscal Year 2025-26 Budget and Authorizing an Interfund Loan

1. Staff Report:

John Doughty, Public Works Director

2. Public Comment

3. Recommended Action:

1. Adopt a resolution awarding a contract to Zumwalt Construction, Inc. for an amount not to exceed $12,279,555, with a total Project Construction Cost of $12,051,237, including $228,318 in Project Contingency Costs, for Design-Build Construction Services for the Santa Teresa Fire Station Construction Project; and authorize the City Administrator to execute the agreement and all other related documents; and

2. Adopt a budget amendment resolution to appropriate $11,942,555 within the Capital Projects Fund, transfer $37,024 from the Facilities Fund, and authorize a temporary interfund loan in the amount of $3,610,757, from the Facilities Fund ($1,500,000), and the General Fund ($2,110,757).

6. CLOSED SESSION

Page 3 of 256 ends

June 29, 2026 | 6:00 PM Page 4 of 4 City Council
Special Meeting

6.1. CONFERENCE WITH LABOR NEGOTIATORS - COLLECTIVE BARGAINING UNITS Pursuant to GC Section 54957.6 and GCC Section 17 A.11 (4) Collective Bargaining Units: AFSCME Local 101 (General & Supervisory Units) Representing Employees Affiliated with AFSCME, Local 101; Local 2805, IAFF Fire Unit Representing Gilroy Firefighters
City Negotiators: Matt Morley, City Administrator; LeeAnn McPhillips, Human Resources Director/Risk Manager
Anticipated lssues(s) Under Negotiation: Wages, Hours, Benefits, Working Conditions; Memorandums of Understanding: City of Gilroy and Gilroy Fire Fighters Local 2805, City of Gilroy and AFSCME, Local 101 General & Supervisory Units

7. ADJOURN TO OPEN SESSION

8. ADJOURNMENT

Page 4 of 256 ends

4.1. City of Gilroy

STAFF REPORT
Agenda Item Title: Claim of S.S. and A.S., surviving minor children of Andrew Stuart and Stacia Stuart and the Estates of Andrew Stuart and Stacia Stuart
Meeting Date: June 29, 2026
From: Matt Morley, City Administrator
Department: Human Resources/Risk Management
Submitted by: LeeAnn McPhillips, Interim Human Resources Director/Risk Manager.

Prepared by: LeeAnn McPhillips, Interim Human Resources Director/Risk Manager.

STRATEGIC PLAN GOALS: Not Applicable

RECOMMENDATION
Based on the recommendation from the Municipal Pooling Authority (MPA) and/or legal counsel, this claim is recommended for rejection.

EXECUTIVE SUMMARY
Based on the recommendation from the Municipal Pooling Authority (MPA) and/or legal counsel, the following claim is submitted to the City Council for rejection at the June 29, 2026 meeting:
• Claim of S.S. and A.S., surviving minor children of Andrew Stuart and Stacia Stuart and the Estates of Andrew Stuart and Stacia Stuart

BACKGROUND

Page 5 of 256 ends

4.1. n/a

ANALYSIS
n/a

ALTERNATIVES
n/a

FISCAL IMPACT/FUNDING SOURCE
n/a

PUBLIC OUTREACH
n/a

NEXT STEPS
n/a
Attachments:

1. Claim of Estates of Andrew and Stacia Stuart June 2026

Page 6 of 256 ends
Page 7 of 256 ends
Page 8 of 256 ends
Page 9 of 256 ends
Page 10 of 256 ends
Page 11 of 256 ends
Page 12 of 256 ends
Page 13 of 256 ends
Page 14 of 256 ends

5.1. City of Gilroy

STAFF REPORT
Agenda Item Title: Award a Contract to Zumwalt Construction, Inc. for DesignBuild Construction Services for the Santa Teresa Fire Station Construction Project for a Total Maximum Project cost of $12,279,555, with a Total Project Construction Cost of
$12,051,237 and Project Contingency in the Amount of
$228,318, and Adopt a Resolution Amending the Fiscal Year 2025-26 Budget and Authorizing an Interfund Loan
Meeting Date: June 29, 2026
From: Matt Morley, City Administrator
Department: Public Works
Submitted by: John Doughty, Public Works Director
Prepared by: Ryan Osenton, Project Manager
STRATEGIC PLAN GOALS: Maintain and Improve City Infrastructure

RECOMMENDATION

1. Adopt a resolution awarding a contract to Zumwalt Construction, Inc. for an amount not to exceed $12,279,555, with a total Project Construction Cost of $12,051,237, including $228,318 in Project Contingency Costs, for Design-Build Construction Services for the Santa Teresa Fire Station Construction Project; and authorize the City Administrator to execute the agreement and all other related documents; and

2. Adopt a budget amendment resolution to appropriate $11,942,555 within the Capital Projects Fund, transfer $37,024 from the Facilities Fund, and authorize a temporary interfund loan in the amount of $3,610,757, from the Facilities Fund ($1,500,000), and the General Fund ($2,110,757).

EXECUTIVE SUMMARY
The City of Gilroy has long planned for the addition of a fourth fire station to address

Page 15 of 256 ends

5.1. operational needs of the Gilroy Fire Department. The City determined that the Glen Loma Ranch community was the appropriate location and ultimately was conveyed a

1.36-acre parcel at the corner of West Luchessa Avenue and Miller Avenue.

Subsequently, the City hired Griffin Structures, Inc to serve as the City’s project/construction manager. Bridging architectural design and programming work was completed through LPA Architects, subcontractor to Griffin. The fire station is planned as an approximate 6,500 square foot single-story structure sited to face the existing roundabout. In April 2026, the City issued a Request for Qualifications and Sealed Proposals soliciting Design-Build Services to identify a team to develop the bridging documents into full construction drawings and complete the construction of the Santa Teresa Fire Station. Qualification Packages were received from four (4) contractors.

Following a competitive review and interview process, the Zumwalt Construction team was determined to be the best Design Build Entity to complete the Santa Teresa Fire Station.

BACKGROUND
The new Santa Teresa Fire Station will improve service coverage and response times for the residents and businesses of Gilroy and replace the current temporary station located at the Ranchside Portion of Christmas Hill Park. The proposed station will be located on a 1.36-acre city-owned parcel at the southeast corner of West Luchessa Avenue and Miller Avenue. The station will be approximately 6,500 square feet in size and include two apparatus bays, dormitory space, kitchen, offices, restrooms, and support areas, with site improvements and emergency power provisions. The station will be “all-electric” and provide vehicle charging station(s). The station is a “Critical Facility” and subject to enhanced design and construction standards. As recommended, the station will not include solar installation (see below for additional details).

The City of Gilroy entered into a Development Agreement in 2005 with the Glen Loma Group to build housing along Santa Teresa Boulevard. This agreement also required delivery of a turnkey fire station prior to the 1,100th building permit. Due to a variety of factors, the project was delayed. In November 2024, the City and developer agreed that the station would be built by the City provided Glen Loma: 1) conveyed the 1.36 acre parcel to the City; and 2) Glen Loma provides funding toward construction. The parcel was conveyed and a final payment of $3.6 million is due upon the recording of a final map covering any portion of Tentative Map 24-03 per agreement. On November 8, 2022, Gilroy voters approved a Charter Amendment to allow for Design-Build procurement process within by the City of Gilroy. Design-Build is an alternative method for delivery of public projects that provides many improvements and benefits when compared to the traditional approach of Design-Bid-Build. The Design-Build methodology allows for a few key benefits, notably:
• A single point of responsibility for both design and construction, which leads to fewer disputes or delays regarding scope, errors, or omissions. • Faster project delivery times due to phases being able to overlap.

Page 16 of 256 ends

5.1. • Costs are more clearly defined earlier in the process due to Guaranteed Maximum Prices or Fixed Based Prices being developed earlier through bridging documents.
• Reduces risk and frequency of Change Orders, which helps keep the project on budget and schedule.

In June 2025, the City issued the Request for Proposals to procure Construction Management with Master Architectural (CM-MA) services to develop program verification, bridging documents, and manage the Design-Build Entity through final design, construction, and project closeout. Griffin Structures was selected as the CMMA based on several factors, including their extensive experience delivering over 100 public safety facilities statewide, including numerous fire stations and Design-Build projects, their specialized Design-Build expertise, with Certified Construction Managers and Design-Build Institute of America professionals on staff to oversee every phase from programming through occupancy, and their demonstrated understanding of the City’s needs, schedule, and budget objectives, with an approach designed to minimize risk and ensure compliance with state and local codes. Griffin Structure's Bridging Documents are attached to this staff report as Attachment 4.

In April 2026, the City issued a Request for Qualifications and Sealed Proposals soliciting Design-Build Services to procure Design-Build Architectural and Construction Services to advance the project through design development, construction documents, permitting, and construction, while verifying all site conditions, coordinating with applicable authorities having jurisdiction, and delivering a fully integrated and code compliant facility (see Attachment 3). In a Design-Build selection process, the City selects a project team with their lead contractor and a partner architectural team. These teams are evaluated on their ability to provide the needed service (qualifications) and subsequently the cost of their proposal. Qualification Packages were received from four (4) contractor teams.

ANALYSIS
The City received four Statements of Qualifications, which were reviewed by an internal evaluation committee in accordance with the published criteria. The evaluation committee evaluated and scored the Qualifications and advanced all four firms to the Sealed Cost Proposal evaluation. Following review and scoring of the Sealed Cost Proposals, the committee determined that all four teams warranted the opportunity to interview. Staff requested Best and Final Offers from each team following the interviews. Following the Interviews and review of Best and Final Offers, the internal committee provided a unanimous recommendation for Zumwalt Construction teamed with Teter Architecture to be the Design-Build Entity for this project. The Zumwalt team received the highest average score during the interview process. Their team also submitted the lowest cost Best and Final Offer. Their Qualifications and Best and Final Offer are attached to this staff report as Attachment 1.

Page 17 of 256 ends

5.1. The selection of the Zumwalt Construction team was based on several factors, including Zumwalt Construction’s and Teter Architecture’s extensive experience delivering public safety facilities statewide, including numerous fire stations and Design-Build projects, their specialized Design-Build expertise, and their demonstrated understanding of the City’s needs, schedule, and budget objectives, with an approach designed to complete the project on schedule and on budget, while minimizing risk and ensure compliance with applicable state and local codes. It was evident in the interview process that Zumwalt Construction and Teter Architecture staff had a strong professional relationship and that would limit design and construction conflicts. Their public safety projects completed include: CAL Fire Station No. 72 in Friant, which was completed on budget and two months ahead of schedule, and Fire Station No. 83 in Farmersville, which was completed under budget with minimal delays. Zumwalt is also in construction for three additional CAL Fire stations in Fresno County, specifically Hart Flat Fire Station No. 11, Cantua Creek Fire Station No. 92, and Fresno Fire Station No. 95, respectively. For all these projects, Zumwalt utilized architectural services from Teter, who will be the architect of record for Santa Teresa Fire Station. Zumwalt and Teter have a long history of partnering together on Design-Build projects. Pricing was a factor in the review committee’s evaluations, with Zumwalt Construction’s Best and Final Offer being the overall lowest total cost of the four received.

As part of the solicitation, the City requested bids for two additives: 1) extension of utilities to the “future use area” to the rear of the site; and 2) the addition of covered solar parking. Staff is recommending the inclusion of the utility extension at a cost of $66,285 due to the likelihood of future use and the challenge of extending the utilities after-the-fact. Staff is not recommending the inclusion of the covered solar parking at a cost of $416,585. While we recognize the desire to integrate sustainability, staff believes that absent the inclusion of battery storage, the benefits of the solar are limited, particularly given the 24-hour nature of a fire station. Staff has inquired about grant funds and have not identified any available for this purpose at present. Shifts in federal priorities and State budget challenges appear to be limiting new grant opportunities.

Covered solar is an item that could be readily be added later to the site. Zumwalt has proposed the inclusion of an additional $163,500 allowance for PG&E related work. This is an allowance and only payable if needed and authorized by the City. Given that PG&E approvals and work is a significant risk to schedule, staff is recommending inclusion of the allowance.

The cost of full Design-Build Services, as recommended, is $12,051,237, plus a Project Contingency in the amount of $228,318, with a total project cost of $12,279,555.

The contract will use the City’s new Design-Build form of agreement, and the scope of work and milestone schedule will be based on the proposal’s response timeframe and project phasing. The design and construction timeframe is anticipated to extend approximately 23 months, ending in May 2028. Zumwalt’s proposed schedule is attached to this staff report as Attachment 2. The schedule reflects a conservative

Page 18 of 256 ends

5.1. approach to wet weather considerations to start construction.

Proposed Project Schedule (in summary):

Phase 1 – Preconstruction – July 2026 through March 2027, approximately 9 months Phase 2 – Construction – April 2027 through April 2028, approximately 12 months Phase 3 – Project Closeout – April 2028 through May 2028, approximately 2 months Phase 4 – Santa Teresa Fire Station Opening – anticipated for June 2028

ALTERNATIVES

1. The City Council may choose to proceed with approval absent the utility extension additive and PG&E allowance. This alternative is not recommended for the reasons noted in the staff report Analysis section.

2. The City Council could include the covered solar parking additive. This is a policy decision for the City Council. Staff provided their rationale for not including within the Analysis section of the staff report.

3. The City Council could choose not to authorize the contract with the Zumwalt team. Staff does not recommend this option given the need for a new permanent fire station, the investment in process, the identification of a quality Design-Build Entity and the committed delivery price.

FISCAL IMPACT/FUNDING SOURCE
This agreement with Zumwalt Construction is for an amount not to exceed $12,051,237 for Design-Build Services, plus $228,318 for Project Contingency, for a total project cost not to exceed $12,279,555.

Previously, the City Council approved an agreement with Griffin Structures for construction management and master architectural services not to exceed $1,163,000 related to the new Santa Teresa Fire Station, including assisting with design-build procurement, development of bridging documents, budget oversight, and project management.

This capital project is included in the adopted FY26-27 CIP as CIP Project 800290 in the Capital Projects Fund (400), with a total budget of $13,000,000, including CM-MA services and the design-build services. The combined project cost is $13,442,555, and additional appropriations of $442,555 is being requested to fully fund the project. A budget amendment is included as Attachment 5 for Council approval that pulls forward $11,500,000 from FY27 to FY26 and appropriates an additional $442,555.

The table below summarizes the total project cost and the funding sources.

Page 19 of 256 ends

5.1. The General Fund (100) and the Facilities Fund (615) have adequate fund balances to support the interfund loans and will be reimbursed upon receipt of funds from the Glen Loma Ranch development project, which is responsible for providing the final $3,610,757 toward the construction of the fire station pursuant to the applicable development agreements. Receipt of these funds is anticipated following approval and recording of the final maps for the remaining neighborhoods, which are currently scheduled for City Council consideration in August 2026, thus the interfund loan is expected to be temporary in nature.

Furniture, Fixtures, and Equipment (FF&E) is not included in the project budget and will be funded separately through the upcoming biennial operating and capital budget development process and is currently estimated to be around $500,000.

PUBLIC OUTREACH
N/A

NEXT STEPS
If approved by Council, staff will complete the contract with the selected vendor and commence the project immediately.

Attachments:

1. Zumwalt Qualifications and BAFO

2. Zumwalt Proposed Project Schedule

3. FINAL 26-RFQP-PW-536 Santa Teresa Fire Station Construction Project

4. Griffin LPA Bridging Documents

5. Budget Amendment Resolution - FY26 STR Fire Station Award

Page 20 of 256 ends

5.1.

Page 21 of 256 ends

Santa Teres a F ire Station – City of Gilroy
Request for Qualifications

Page 22 of 256 ends

Introduction Letter Confirming Qualifications
To Ryan Osenton and the City of Gilroy Selection Committee, This year, Zumwalt Construction, Inc. proudly celebrates 30 years of serving the Central Valley, completing numerous public and private sector projects including fire stations, educational facilities, medical clinics, commercial buildings, multifamily housing, libraries, and hospitals. With nearly 90% of our current workload delivered through the design-build method, we believe Zumwalt is uniquely qualified to support the City of Gilroy in the design and construction of the Santa Teresa Fire Station Project.

Most recently, Zumwalt Construction was awarded the Hart Flat Fire Station No. 11, Cantua Creek Fire Station 92, and Fresno Fire Station No. 95 projects with CAL FIRE, further demonstrating our experience delivering high-quality public safety facilities through collaborative design-build partnerships.

Zumwalt Construction is committed to providing a successful collaboration that meets the City’s programming goals, budget, schedule, and quality expectations. Our design-build expertise includes:
• Design-build preconstruction services
• Collaborative project scheduling
• Cost estimating and budget management
• Coordination of design-build MEP trades
• Quality control and site safety
We strongly believe early collaboration between the design and construction teams is critical to project success. By engaging key trade partners and consultants during design, the project benefits from improved constructability, cost efficiency, schedule reliability, and document coordination, creating a seamless transition from design through construction.

Our team will provide all required services including general contracting, surveying, geotechnical investigation, civil, mechanical, electrical, landscape, fire suppression, permitting, construction, inspections, testing, commissioning, procurement, and installation. Zumwalt Construction will also coordinate with all applicable federal, state, and local agencies and ensure compliance with all applicable codes, regulations, and laws.

Zumwalt Construction confirms that all information submitted during the RFQ process remains true and accurate, and we acknowledge receipt of all applicable addenda issued for this solicitation.

We appreciate the opportunity to partner with the City of Gilroy on this important project and look forward to delivering a high-quality facility completed safely, on time, and within budget.

Sincerely,
Robert McKnight
President
Zumwalt Construction, Inc

Page 23 of 256 ends

TABLE OF CONTENTS:

INTRODUCTION LETTER CONFIRMING QUALIFICATIONS 2

1. COMPANY OVERVIEW & INFORMATION 4

2. KEY PERSONNEL AND ORGANIZATIONAL STRUCTURE 6

3. PROJECT EXPERIENCE AND PAST PERFORMANCE 7

4. PROJECT UNDERSTANDING AND APPROACH 8

5. SCHEDULE AND DELIVERY CAPACITY 9

6. PROJECT CONTROLS AND RISK MANAGEMENT 10

7. SUBCONTRACTOR STRATEGY AND MARKET APPROACH 11
SAFETY PLAN AND SAFETY RECORD 13

Page 24 of 256 ends
Page 25 of 256 ends

1. Company Overview & Information
A. Name of Firm: Zumwalt Construction
Office Location: 2250 E Lamona Ave, Fresno CA 93727
Principal of Firm: Robert McKnight, [email protected] Contact person regarding this RFP: Laureen Jansen, [email protected] Tyson Peters, [email protected]
B. Current physical address: 2250 E Lamona Ave, Fresno CA 93727 Phone number: 559 -252 -1000
C. At Zumwalt Construction, we bring over 30 years of experience as a trusted general contractor in Fresno, serving a wide range of markets including fire stations, schools, office buildings, affordable and multi -housing, medical facilities, and public works. Our extensive experience is tailored to meet and exceed the specific needs of your new medical office buildings, ensuring quality construction and timely deliver y.

Our commitment to excellence and client satisfaction is at the forefront of everything we do. We pride ourselves on delivering projects that are both on time and within budget, while maintaining the highest standards of craftsmanship and safety.

Our team, led by Bob McKnight, combines technical expertise with years of field experience to bring your vision to life smoothly and efficiently. With a focus on quality and precision, we manage each phase of the project with careful attention to detail, e nsuring minimal headaches for you. From planning through completion, our experienced professionals are dedicated to delivering outstanding results on time and within budget.

Zumwalt Construction, Inc. has an excellent reputation with our Clients, Architects, Suppliers and Subcontractors for the reason that our Administrators, Estimators, Project Managers and Project Superintendents are proactive in working collaboratively. We strive to foster a culture of fairness and efficiency.

OUR SERVICES INCLUDE:

Preconstruction:

Budgeting & Cost Estimating
Value Engineering
Constructability Reviews
Scheduling & Phasing Plans
Permitting Assistance
Construction:

Design -Build & Design -Assist
General Contracting
Construction Management
Site Development & Preparation
Safety
Quality Assurance & Quality Control
Scheduling:

Baseline Project Scheduling
Critical Path Method (CPM) Scheduling
Monthly Schedule Updates & Progress Tracking
Weekly Short -Interval Schedules
Delay Analysis & Mitigation Strategies

Page 26 of 256 ends

D. Firm’s Tax I.D. #: 77 -0391018
Legal Form of Company (partnership. corporation, joint venture): S -Corporation Length of Time your Firm has been in Business : (30) Thirty Years Number of Employees: Sixty (60)
List all active Contractors’ license types, license numbers, and dates of expiration:

Contractors State License Board, License Number: 706140, Classification B, Expiration Date 05/31/2027

Page 27 of 256 ends
Page 28 of 256 ends

2. Key Personnel and Organizational Structure
Please refer to the resumes aached to the following pages.

Name Job
Classification
Narrative Delivery
Art Zavala Construction
Director
Team leader to manage, and coordinate all
phases from preconstruction through
closeout; provides operations oversight
and direction to all team members
Part-time during
preconstruction; Full-time
during the construction
phase
Landon Seamons Senior Estimator In charge of bid solicitations, calculations, subcontractor and supplier negotiations,
and detailed takeoffs
Full-time during
preconstruction estimating/
budget phases, Part-time
during the construction
phase
Jonathan Temple Project Manager Assist with constructability reviews and assist in all Facets of the preconstruction
phase; assists with subcontractor bid
solicitations through all design phases
Full-time during the
construction phase
James Hayes Superintendent Site Assigned Superintendent. Provides daily site management and supervision of
all trade’s teams, Architects, Consultants,
Site Inspectors, and works with the Owner
Representatives.

Full-time during the
construction phase
Tyson Peters Pre-construction
Manager
Ensuring all preconstruction activities align
with project deadlines; Developing
preliminary project schedules and
timelines; Coordinating with project
managers, contractors, and suppliers.

Full-time during the preconstruction phase

Page 29 of 256 ends

Robert McKnight
President
Art Zavala
Construction Director
Jonathan Temple
Project Manager
James Hayes
Superintendent/
Quality Control Manager
Tyson Peters
Preconstruction Director
Jacob Becker
Scheduler
Landon Seamons
Senior Estimator
Scott Reynolds
Admin
Clay Davis
Architect of Record
Lyle Munsch
Design Architect
Glenn Miller
Senior Architect
Megan Chang
Principal Structural
Engineer

Page 30 of 256 ends

ABOUT ME
Bob has been with Zumwalt Construction, Inc. for over 10 years and has been in the construction industry for over 30 years. He has earned a reputation for providing outstanding quality in all phases of Project Management with an
emphasis in Design Build and Design Bid Build delivery
methods. Bob oversees all project management within our organization and regularly visits our jobsites to provide support to our team. He is experienced in interpretation of plans and specifications, project planning, scheduling and meeting deadlines, submittal requirements and processes, as-builts, meeting notes, subcontracts, change orders,
variable costs logs and certified payroll.

EXPERIENCE
• Fire Station No. 72, Friant CA, Current
• Fire Station No, 83, Farmersville, CA, Current
• FCRTA Maintenance Facility, Selma, CA
• Majestic Inn, Visalia, CA
• Jenny’s Place, Modesto, CA
• IBEW Office Building, Fresno, CA
• Castroville Farm Labor, Castroville, CA
• California Health Sciences University, Clovis CA
• Tule River Indian Health Center, Current
• Mendota Unified School District, New Elementary School • Miwok Admin Building, Shingle Springs CA
• State Center Community College District, Historic Old Administration Building, Fresno CA

ROBERT MCKNIGHT
President
[email protected]
559-252-1000
zumwaltconstruction.com

EDUCATION
BS Construction Management
UC Davis
30+ YEARS OF

EXPERIENCE

Page 31 of 256 ends

ABOUT ME
Art has been a Project Manager for Zumwalt Construction, Inc. for over 10 years and in the construction industry for over 25 years. He brings a high level of organization, negotiation skills, interpersonal skills and experience to all projects he has been involved in.Art continues to work on hospitals,large scale commercial buildings, multi-family housing and schools.

Providing oversight on all phases of the construction process ensuring project specifications are being followed and work is proceeding with quality, on schedule and within budget. He provides support to the Project Superintendent, reviews their reports and works to proactively identify any changes in project scope and ensures proper measures are taken. Coordinate meetings with the owner, architects, contractors and other individuals involved to provide a progress update and any necessary modifications.He ensures that our jobsite have been inspected by our Site Safety Officer and safety requirements are being met.

EXPERIENCE
• Fire Station No. 72, Friant CA, Current
• Frenso American Indian Health Project, Fresno, CA, Current • Tule River Indian Admin
• Fresno American Indian Health Project, Fresno, CA, Current • Fire Station No. 83, Farmersville, CA, Current
• Valley Heath Team Kingsburg
• Portola Senior Apartments, Portola CA
• Palm Office Building, Fresno, CA
• Valley Children’s Hospital, NICU, Madera CA
• Kaweah Delta Health Care District – 5th and 6th Floor Infill, Visalia CA • Kaweah Delta Health Care District – Emergency Department Addition

ART ZAVALA
Construction Director
[email protected]
559-252-1000
zumwaltconstruction.com

EDUCATION
BS Industrial Technology
Construction
California State University Fresno

CERTIFICATIONS
OSHA 10 hour
OSHA 30 hour
First Aid and CPR

Page 32 of 256 ends

ABOUT ME
Tyson has been with Zumwalt Construction, Inc. since 2013 and has over 15 years of experience in all facets of the industry with a proven track record of successful completion of numerous multimillion dollar commercial projects. His experience in Public Works with schools is impressive. Tyson analyzes construction documents and assists subcontractors plus develops all project scheduling utilizing Microsoft Project, P6 and supervises all quality control efforts. He ensures all safety requirements are met, and tracks and controls construction costs against the project budget to avoid cost overruns.

Tyson also meets regularly with the owner, design group, contractors, and others to monitor and coordinate all phases of construction.

EXPERIENCE
• Fire Station No. 72, Friant CA, Current
• Fire Station No, 83, Farmersville, CA, Current
• Cantua Creek Fire Station No. 92, Cal Fire, CA
• Del Rey Admin Building, Cal Fire, CA
• Hart Flat Fire Station No. 11, CA
• FCRTA Maintenance Facility, Fresno CA
• Fresno American Indian Health Project, Current
• IBEW Office Building, Fresno, CA
• Valley Heath Team Kingsburg
• Valley Health Team Firebaugh
• California Health Sciences University, College of Osteopathic Medicine
• Crisis Residential Treatment Facility, Fresno CA
• Lincoln Elementary School, Mechanical Replacement, Sanger Unified School District

TYSON PETERS
Preconstruction/ Business Development Director
[email protected]
559-252-1000
zumwaltconstruction.com

EDUCATION
B.S Construction Management
California State University
Fresno

CERTIFICATIONS
OSHA 30 Hour
First Aid and CPR Certified
P6 Certification

Page 33 of 256 ends

ABOUT ME
Jonathan is an experienced and adaptable professional with a strong work ethic and effective communication skills. He thrives under pressure and concstently earns high marks for work quality and speed, Just recently he received an award after successfully completing Fire Station No. 72 in Friant, CA for his hard work and dedication throughout the project. He has a proven track record of efficiently completling tasks in commercial, industrial and residential construction and is a dynamic team member of Zumwalt Construction.

EXPERIENCE
-Fire Station No. 83, Farmersville, CA
-Fire station 72, Friant, CA
-St. Mary’s College UCU Pavilion addition and renovation, Moraga, CA -Jaguar Land Rover dealership,Livermore, CA
-Mars Petcare Nutro campus renovation and additional office building, Victorville, CA
-St. Mary’s College Baseball Brother Ronald Gallagher Stadium renovation, Moraga, CA
-New Life Chrisian Center TI, Turlock, CA
-Cal Grand Manor Apartments, Atascadero, CA

JONATHAN TEMPLE
Project Manager
[email protected]
559-252-1000
zumwaltconstruction.com

EDUCATION
Bachelor of Arts
Business Management
Valparaiso University

CERTIFICATIONS
Safety Service Award - Superior
Performance, National Safety
Council
OSHA 30 Hour
COVID-19 Safety Manager
Mandated Reporter Certification
Drug and Alcohol FMCSA
CPR certified

Page 34 of 256 ends

ABOUT ME
James has been with Zumwalt Construction since 2019.

He started gaining experience as a Journeyman Carpenter in 1985. His background provides him with years of
knowledge and experience to overcome obstacles timely
and effectively. James performs regular safety walks of the construction site to ensure the working environment remains safe for all construction trades and Owners
entering the site. James has strong leadership skills and is extremely detail oriented. Most recently James has
completed 3 Valley Children’s Hospital Projects, as the Senior Project Manager.

EXPERIENCE
• Fire Station No, 83, Farmersville, CA, Current
• Valley Children’s PET CT/ Reading Room
• Tule River Indian Health Center
• CMC Ambulatory Surgical Center
• Valley Children’s N.I.C.U 23 Bed Infill
• Valley Children’s Nurse Call System
• Valley Children’s MIR Replacement
• Valley Children’s CT 64 Replacement
• Valley Children’s Radiology/PET-CT
• Crisis Residential Treatment Facility, Fresno CA
• ARC Fresno, Fresno CA
• Badger Fire Station, Fresno CA

JAMES HAYES
Superintendent
[email protected]
559-252-1000
zumwaltconstruction.com

EDUCATION
B.S Construction Management
California State University
Fresno

CERTIFICATIONS
OSHA 30 Hour
First Aid and CPR Certified

Page 35 of 256 ends
Page 36 of 256 ends
Page 37 of 256 ends
Page 38 of 256 ends
Page 39 of 256 ends

FIRE STATION NO. 72, FRIANT
DESCRIPTION OF WORK The fire station is a design build project of a 7,000 SF pre-engineered metal building, metal roof, metal siding with brick veneer and a covered patio. Interior consists of a kitchen, dining room, day room, 6 bedrooms, 4 bathrooms w/showers, lobby, office, turnout area, fitness room and 3 bay apparatus area. Site includes landscape, hardscape, decontamination shower, backup generator, fuel station, hose drying area and solar field.

OWNER Fresno County Fire District
RESPONSIBLE FIRM AND ROLE Zumwalt Construction, General Contractor PROJECT MANAGER Tyson Peters, Zumwalt Construction
ON-SITE PROJECT MANAGER Jonathan Temple, Zumwalt Construction PROJECT SUPERINDENDENT , Zumwalt Construction

CONSTRUCTION MANAGER N/A
ARCHITECT OF RECORD Clay Davis, TETER, Inc.

DELIVERY METHOD Design-Build
SCOPE OF SERVICES General Contractor
GMP$ $5,500,000
FINAL CONSTRUCTION COSTS $5,500,000
DATE CONSTRUCTION COMMENCED 1/26/2023
ORIGINAL SCHEDULE COMPLETION 12/31/2025
ACTUAL SCHEDULE COMPLETION 10/2025

DATE OF DSA CLOSE-OUT CERTIFICATION N/A
OWNER REFERENCE Dustin Hail, [email protected]
3 RELEVANT PROJECT EXPERIENCE

Page 40 of 256 ends

FIRE STATION NO. 83, FARMERSVILLE
DESCRIPTION OF WORK This fire station will consist of an 8,500 SF PEMB, metal roof, metal siding with brick veneer and covered patio. Interior includes, lobby, work station, 3 offices, kitchen, living room, 2 laundry rooms, 4 bedrooms, 4 restrooms with showers, turnout area, fitness room, training room, training platform and 3 bay apparatus area. Site includes landscape, hardscape, backup generator, decontamination shower and hose drying area.

OWNER City of Farmersville
RESPONSIBLE FIRM AND ROLE Zumwalt Construction, General Contractor PROJECT MANAGER Tyson Peters, Zumwalt Construction
ON-SITE PROJECT MANAGER Art Zavala, Zumwalt Construction PROJECT SUPERINDENDENT James Hayes, Zumwalt Construction

CONSTRUCTION MANAGER N/A
ARCHITECT OF RECORD Clay Davis, TETER, Inc.

DELIVERY METHOD Design-Build
SCOPE OF SERVICES General Contractor
GMP$ $6,500,000
FINAL CONSTRUCTION COSTS $6,431,575
DATE CONSTRUCTION COMMENCED 1/26/2023
ORIGINAL SCHEDULE COMPLETION 10/31/2025
ACTUAL SCHEDULE COMPLETION 12/26/2025

DATE OF DSA CLOSE-OUT CERTIFICATION N/A
OWNER REFERENCE Dustin Hail, [email protected]
3 RELEVANT PROJECT EXPERIENCE

Page 41 of 256 ends

FCRTA MAINTENANCE FACILITY
DESCRIPTION OF WORK The facility includes a 9,250-square-foot maintenance shop designed to service both natural gas and electric transit buses. This shop is primarily dedicated to lightduty vehicles and vans, with available space for a 5,400-square-foot expansion.

Additionally, the site features a 6,000-square-foot administrative office and dispatch center, as well as a 4,600-square-foot training facility focused on advanced transit vehicle technology for technician training. To support electric vehicle operations, the facility includes 500 kilowatt-hours (kWh) of battery storage. It also houses a bus wash system equipped with a blow dryer, capable of accommodating buses up to 40 feet in length.

OWNER California Health Sciences Univeristy
RESPONSIBLE FIRM AND ROLE Zumwalt Construction, General Contractor PROJECT MANAGER Tyson Peters, Zumwalt Construction
ON-SITE PROJECT MANAGER Tyson Peters, Zumwalt Construction PROJECT SUPERINDENDENT Ken Flock, Zumwalt Construction

CONSTRUCTION MANAGER N/A
ARCHITECT OF RECORD Clay Davis, TETER, Inc.

DELIVERY METHOD Design-Build
SCOPE OF SERVICES General Contractor
GMP$ $15,000,000
FINAL CONSTRUCTION COSTS $21,000,000 (due to change orders requested by DATE CONSTRUCTION COMMENCED 3/2023
ORIGINAL SCHEDULE COMPLETION 4/15/2025
ACTUAL SCHEDULE COMPLETION 5/30/2025

DATE OF DSA CLOSE-OUT CERTIFICATION N/A
OWNER REFERENCE Moses Stites, [email protected]
3 RELEVANT PROJECT EXPERIENCE

Page 42 of 256 ends

CALIFORNIA HEALTH SCIENCES UNIVERSITY
DESCRIPTION OF WORK ZCI coordinated and participated in bi-weekly design meetings, facilitated integration between design disciplines, including mechanical, electrical, plumbing, fire sprinklers, and structural steel, and managed a Level 2 BIM process with designassist participants. MEP/FS and structural contractors were introduced early in the design phase as design-assist contractors to specifically address budgeting, scheduling, code compliance, and offer constructability suggestions. MEP/FS and structural contractors were selected via an RFQ process early in the design phase to provide current market pricing on selected materials and equipment, value engineering options, and product availability to mitigate potential cost issues and any delay with long-lead materials. Cost estimates were presented to CHSU and design team at the close of each design phase (i.e. schematic design, design development, and construction documents)
OWNER California Health Sciences Univeristy
RESPONSIBLE FIRM AND ROLE Zumwalt Construction, General Contractor PROJECT MANAGER Tyson Peters, Zumwalt Construction
ON-SITE PROJECT MANAGER Ashley Tidrick, Zumwalt Construction PROJECT SUPERINDENDENT Dusty Jones, Zumwalt Construction

CONSTRUCTION MANAGER N/A
ARCHITECT OF RECORD Tony Avila, Darden Architects, Inc.

DELIVERY METHOD Design-Assist
SCOPE OF SERVICES General Contractor
GMP$ $39,368,629.00
FINAL CONSTRUCTION COSTS $39,368,629.00
DATE CONSTRUCTION COMMENCED 5/30/2017
ORIGINAL SCHEDULE COMPLETION 1/31/2019
ACTUAL SCHEDULE COMPLETION 4//2020

DATE OF DSA CLOSE-OUT CERTIFICATION N/A
OWNER REFERENCE Jimmy Dunn, [email protected]
3 RELEVANT PROJECT EXPERIENCE

Page 43 of 256 ends
Page 44 of 256 ends

4. Project Understanding and Approach
Zumwalt Construction understands that the Santa Teresa Fire Station is more than a building project; it is a critical public safety facility intended to improve emergency response capabilities, support firefighter wellness, and serve the City of Gilroy for decades. The project must deliver a modern, durable, code-compliant, and operationally efficient fire station while maintaining cost control, schedule discipline, and alignment with the City’s established program and performance criteria.

The City’s bridging documents provide a strong basis of design, but successful delivery will require an experienced design-build team that can quickly validate the documents, identify gaps or coordination issues, confirm constructability, and advance the design through permit-ready construction documents without losing sight of the City’s budget, schedule, and operational priorities. Our approach is built around early alignment, transparent communication, and disciplined design-to-budget management.

Zumwalt recently received the award for the Hart Flat Fire Station 11 project with Kern County, which utilizes the same bridging document approach to design-build delivery. That experience is directly relevant to Santa Teresa Fire Station. On Hart Flat, our team was selected to take County-provided bridging documents and advance them through design development, permitting, value analysis, constructability review, and final construction pricing. This recent award demonstrates our understanding of how to manage the transition from owner-defined criteria to a coordinated, permitready design while protecting the owner’s intent, budget, and schedule.

Our approach begins with a structured project kickoff involving the City, Griffin Structures, the design team, key trade partners, and applicable agencies. We will confirm project goals, decision-making protocols, schedule milestones, reporting requirements, and design review expectations. Early in the process, we will prepare a responsibility matrix, design milestone schedule, permitting roadmap, long-lead procurement log, and risk matrix to ensure the team is aligned before design advancement begins.

Because this project is being delivered from 100% schematic-level bridging documents, our team will perform an immediate constructability and scope-gap review. This review will focus on code compliance, site grading and drainage, utility coordination, apparatus access and circulation, structural and MEP system integration, fire station alerting, essential services requirements, long-term durability, and maintainability. Any questions or potential conflicts will be elevated early so they can be resolved before they create cost or schedule impacts.

Cost control will be managed continuously as the design advances. We will track design decisions against the established GMP, provide milestone cost updates, identify budget trends early, and present value-conscious options that preserve the City’s program and performance requirements. Our goal is not to redesign the project, but to refine it into a coordinated, constructible, and cost-effective solution that meets the City’s operational needs.

Zumwalt will also prioritize agency coordination. We understand the DBE is responsible for advancing the project through permitting and coordinating with authorities having jurisdiction, utility providers, and City departments. Our team will establish an agency coordination log and proactively manage plan check comments, utility applications, fire department requirements, stormwater requirements, and inspection expectations to minimize delays.

Communication will be consistent, transparent, and action-oriented. We anticipate weekly project meetings during design and preconstruction, monthly schedule and cost reporting, clear meeting minutes, updated decision logs, and early escalation of items requiring City input. Our experience on fire station and public agency work has shown that timely decisions, clear documentation, and early trade involvement are the keys to maintaining momentum.

Ultimately, our approach is to function as a true design-build partner: protect the City’s program intent, advance the bridging documents into a complete and coordinated design, maintain budget and schedule discipline, and deliver a highquality fire station that supports Gilroy’s firefighters and the community they serve.

Page 45 of 256 ends

5. Schedule and Delivery Capacity
Zumwalt Construction understands that schedule performance is a key priority for the Santa Teresa Fire Station project.

The City’s RFQ/P specifically evaluates each Design-Build Entity’s ability to deliver projects on or ahead of schedule, manage project schedules, overlap design and construction activities, identify schedule risks, and procure long-lead items early to support expedited delivery. The project also requires the DBE to advance the City’s 100% schematic-level bridging documents through permitted construction documents while maintaining cost control, schedule discipline, and alignment with the established GMP.

Zumwalt has a proven history of meeting project milestones. In the history of our company, we have never been assessed liquidated damages. We have consistently delivered projects on time or ahead of schedule by establishing realistic baseline schedules, identifying critical path activities early, maintaining frequent communication with owners and design teams, and proactively resolving issues before they affect the completion date.

Our schedule approach begins during preconstruction. Immediately after award, we will develop a comprehensive project schedule that incorporates design advancement, agency review, permitting, procurement, early construction opportunities, inspections, commissioning, closeout, and City occupancy milestones. This schedule will be supported by a detailed submittal log, procurement log, agency coordination log, and risk matrix. We will update the schedule regularly and use weekly look-ahead schedules with our subcontractors and design partners to maintain accountability at the field level.

Zumwalt recently demonstrated this approach on the completed Fire Station 72 project in Friant, California. Fire Station 72 was a design-build public safety project with an extremely tight timeline. To accelerate delivery, our team worked closely with the County of Fresno to obtain early permits for at-risk grading, the building pad, and site utilities while the design team completed the remaining permit documents and building permit review. This overlap of design, permitting, and construction activities saved approximately two months from the overall project duration and allowed the project to maintain momentum without compromising quality or coordination.

We will apply the same fast-track mindset to Santa Teresa Fire Station. Where appropriate, we will evaluate opportunities for early procurement and early construction activities, such as grading, utility coordination, long-lead electrical equipment, generator procurement, mechanical equipment, apparatus bay doors, fire station alerting systems, and other schedulesensitive scopes. The RFQ/P allows early and incremental construction activities to be evaluated and presented to the City for approval when beneficial to the schedule.

Our team also understands that schedule success on this project will depend heavily on early agency and utility coordination. We will proactively coordinate with the City of Gilroy, Griffin Structures, the Building Division, Fire Department, utility providers, testing and inspection agencies, and applicable authorities having jurisdiction. Our objective is to reduce surprises during plan check, resolve utility and permit issues early, and maintain a clear path from design completion to construction start.

Zumwalt’s schedule approach is built on planning, communication, and accountability. We do not wait for problems to become delays. We identify risks early, assign responsibility, track decisions, and keep the City informed with clear schedule updates and recovery strategies when needed. This disciplined approach, combined with our proven designbuild fire station experience, gives the City confidence that Zumwalt can deliver the Santa Teresa Fire Station efficiently, collaboratively, and on schedule.

6. Project Controls and Risk Management
Zumwalt Construction understands that effective project controls and risk management are essential to the successful delivery of the Santa Teresa Fire Station. The City’s RFQ/P identifies cost tracking, budget management, and the identification and management of project risks as the primary evaluation considerations for this section. Our approach is built around early visibility, disciplined documentation, transparent communication, and proactive issue resolution.

Page 46 of 256 ends

From the outset, Zumwalt will establish a clear project controls framework that allows the City, Griffin Structures, the design team, and key trade partners to understand where the project stands at all times. Our team will use Procore for project documentation, RFIs, submittals, meeting minutes, cost events, change management, document control, and field reporting. This creates a single, organized platform for tracking decisions, maintaining accountability, and preserving a clear project record.

Cost control will begin immediately after award. Because the project will be advanced from the City’s 100% schematiclevel bridging documents into final construction documents, Zumwalt will continuously track design development against the established GMP. At each design milestone, we will review scope changes, drawing evolution, constructability items, material selections, and subcontractor input to identify any cost trends before they become budget issues. When a potential variance is identified, our team will present the City with clear options, including cost impacts, schedule impacts, life-cycle considerations, and recommendations for maintaining alignment with the project budget.

Risk management will be handled through a living risk matrix that is created at project kickoff and updated throughout design, permitting, procurement, and construction. The risk matrix will identify each issue, responsible party, potential cost or schedule impact, mitigation strategy, and required decision date. Typical risks we will monitor include bridging document gaps, utility coordination, plan check comments, long-lead equipment, site conditions, stormwater requirements, essential services requirements, subcontractor availability, escalation, and owner decision points.

Zumwalt’s risk management philosophy is simple: identify early, communicate clearly, and solve collaboratively. We do not allow issues to linger until they become change orders or schedule delays. Our project manager and superintendent will work closely with the City and design team to resolve questions quickly, document decisions, and keep the work moving. Weekly meetings will include review of RFIs, submittals, procurement, cost trends, schedule risks, and upcoming decisions required from the City.

During construction, Zumwalt will maintain tight control of field production, quality, safety, and cost exposure. Change events will be documented promptly and reviewed for entitlement, pricing, schedule impact, and available mitigation before proceeding. Subcontractor performance will be monitored through weekly coordination meetings, look-ahead schedules, manpower reviews, and field inspections. This ensures that risks are managed in real time rather than after they affect the project.

Our experience delivering public agency and design-build projects has reinforced the importance of disciplined project controls. For Santa Teresa Fire Station, Zumwalt will provide the City with a transparent, accountable, and proactive management process that protects the GMP, reduces surprises, supports timely decisions, and delivers a high-quality public safety facility with confidence.

As an example of our project controls process, Zumwalt has included a sample risk matrix prepared for the SCCCD New Police Station and Data Center project as an attachment to this SOQ. This matrix demonstrates how our team identifies, categorizes, tracks, and manages project risks from the earliest stages of design and preconstruction.

7. Subcontractor Strategy and Market Approach
Zumwalt Construction understands that the City will evaluate this section based on the identification of key subcontractors and trade partners, as well as the approach to subcontractor procurement and management. Our strategy is to engage qualified design consultants, engineers, and key trade partners early so the project benefits from real-time constructability input, accurate market pricing, value engineering, and early identification of long-lead items.

For the Santa Teresa Fire Station, Zumwalt has selected and prequalified the following design consultants, engineers, and subcontractors:

Page 47 of 256 ends

Team Member Scope
TETER Architects Architectural, Structural, Interior Design MVE Civil Engineering
Designlab252 Landscape Design
Fire Systems Solutions Fire Sprinkler and Fire Alarm Design Tarrar Utility
Consultants
PG&E Electric Design/ Joint Trench Utility
Coordination
Fresno Plumbing Plumbing
Patton HVAC
Rex Moore Electrical/ Low-Voltage

This team was selected because of its relevant fire station and public safety experience, available horsepower to support an expedited design schedule, and proven ability to contribute meaningfully during preconstruction. Each partner understands that success on a design-build fire station requires more than preparing drawings or providing a bid. It requires active participation in scheduling, constructability reviews, design-to-budget decisions, value engineering, utility coordination, and long-lead procurement planning.

A key component of our market and schedule strategy is the early involvement of Tarrar Utility Consultants. Tarrar provides a significant schedule and coordination benefit by advancing the applicant-side utility design rather than waiting for PG&E or other utility providers to drive the process from start to finish. Their scope includes PG&E electric design, joint trench composite design, preliminary routing, transformer and service location coordination, utility applications, lowvoltage provider coordination, trench details, bid documents, and support through utility review and approval.

By engaging Tarrar early, our team can identify utility conflicts, service routing requirements, tie-in points, clearance issues, and cost impacts during design instead of discovering them during construction. This proactive approach helps compress the front-end utility design timeline, reduce redesign and resubmittals, improve bid clarity, and protect the overall project schedule, while still allowing PG&E and other utility providers to complete their required reviews and approvals.

Our selected design and trade partners will be engaged immediately following award to review the City’s bridging documents, validate assumptions, identify scope gaps, and help advance the project toward a coordinated permit-ready design. Their early involvement will allow Zumwalt to provide the City with practical recommendations that balance operational functionality, durability, cost, schedule, and long-term value.

Zumwalt also utilizes BuildingConnected for subcontractor procurement and bid management throughout the preconstruction process. BuildingConnected allows our team to organize bid packages, distribute documents, manage bidder communication, track subcontractor interest, issue addenda, compare proposals, and maintain a transparent procurement record. This process improves bid coverage, reduces missed scope, supports competitive pricing, and allows our estimating team to maintain clear documentation of the market response.

For scopes that are not already identified as part of the proposed DBE team, Zumwalt will follow applicable public works and design-build procurement requirements. We will establish clear scopes of work, reasonable qualification criteria, bid due dates, and evaluation procedures to ensure subcontractors are qualified, responsive, properly licensed, DIRregistered, and capable of meeting the project’s schedule and quality expectations.

During construction, subcontractor management will be handled through weekly coordination meetings, short-interval schedules, submittal and procurement tracking, manpower planning, quality control inspections, and safety oversight.

Zumwalt’s project manager and superintendent will work directly with each trade partner to ensure field installation is properly sequenced, coordinated, and aligned with the approved construction documents.

Our subcontractor strategy is built on early engagement, disciplined procurement, and proactive management. By combining a prequalified design-build team with structured market outreach through BuildingConnected and early utility design support through Tarrar, Zumwalt will provide the City of Gilroy with a strong, responsive, and accountable team capable of delivering the Santa Teresa Fire Station efficiently and successfully.

Page 48 of 256 ends

Alliant Insurance Services, Inc.  641 S Ham Lane, Suite B  Lodi, CA 95242 PHONE (510) 333-0410  FAX (209) 333-1584  EMAIL [email protected]  License No. 0C79771 March 31, 2026
To Whom It May Concern
RE: Zumwalt Construction, Inc. – Five (5) Year Experience Modification Rating (EMR) History Adjusted for Field Only / Non-Clerical Loss
The purpose of this letter is to verify and explain the experience modification rating (EMR) factors developed specifically for Zumwalt Construction, Inc.’s Construction & Field Employees, not including those factors from claims involving clerical or sales employees.

EMR Effective Date EMR Factor Field-Only
Adjusted EMR Factor
9/1/26 – 9/1/27 0.86 0.86
9/1/25 – 9/1/26 0.84 0.84
9/1/24 – 9/1/25 1.29 0.97
9/1/23 – 9/1/24 1.05 0.77
9/1/22 – 9/1/23 1.01 0.83
Five (5) Year Average 1.01 0.85
As noted in the table, Zumwalt Construction, Inc.’s historical Field-Only Adjusted EMR is exemplary and averages over 15 points below the common industry thresholds of 1.00-1.05.

The overall “safety” rating of a contractor is important in determining a company’s safety environment at their construction sites. The Field-Only Adjusted EMR is far more representative of the practical, site-safety and projected losses applicable to future work and is becoming a much more common tool in project prequalification.

The Adjusted EMR factor is calculated by using the exact same EMR Calculation Model used by the California WCIRB in calculating their factor.

Sincerely,
David Schnapp
Senior Vice President
Construction Services Group
Alliant Insurance Services, Inc.

Page 49 of 256 ends

January 8, 2026
Re: Zumwalt Construction, Inc.

To Whom It May Concern:

Nationwide Mutual Insurance Company is the surety for Zumwalt Construction, Inc. and we hold them in the highest regard and recommend them to you without hesitation. We currently provide Zumwalt with a surety program of $40,000,000 single, $100,000,000 aggregate.

Issuance of the bonds is subject to application of Nationwide’s usual and customary underwriting standards and risk selection criteria, including, but not limited to, satisfactory contract terms and conditions, satisfactory bond forms, receipt and satisfactory review of current underwriting information from our client, evidence of adequate owner financing, and the appropriate request form from our contractor for us to provide the bonds. This letter does not constitute an assumption of liability. The issuance of bonds in connection with your Project is a matter solely between Nationwide and Zumwalt. We assume no liability to you or any third party by the issuance of this letter.

Nationwide Mutual Insurance Company has a Treasury listing of over $1.5 billion. Nationwide Mutual Insurance Company maintains an “A” rating and a financial category size of XV by A.M. Best, and the company is licensed to do business in all fifty states.

Should you have any questions, please do not hesitate to contact me at (209) 210-6968.

Sincerely,
Daniel M. Connolly
Attorney-in-Fact
Nationwide Mutual Insurance
1100 Locust Street Department 2006 | Des Moines, IA 50391-2006

Page 50 of 256 ends
Page 51 of 256 ends
Page 52 of 256 ends
Page 53 of 256 ends

Activity ID Activity Name Orig Dur Start Finish
Santa Teresa Fire Station (BAFO) 523 4/24/26 5/30/28
RFQ/P Schedule 44 4/24/26 6/29/26
RFQP_1000 RFQ/P distributed to prospective DBEs and advertised 0 4/24/26* RFQP_1010 Deadline for RFQ/P Questions and Comments 0 5/12/26* RFQP_1020 Response to RFQ/P Questions Emailed 0 5/14/26* RFQP_1030 RFQ/P Submissions due to the City of Gilroy 0 5/28/26* RFQP_1040 Selection Committee evaluates RFQ submissions and selects up to four DBE for Pre-Approved List 5 6/1/26 6/5/26 RFQP_1050 Interviews with Pre-Approved DBE 0 6/16/26*
RFQP_1060 E-Mail Notice provided to all Pre-Approved DBE of decision 0 6/22/26* RFQP_1070 City and chosen DBE initiate work on Design-Build Agreement 0 6/22/26* RFQP_1080 City Council authorizes award of Design-Build Agreement subject to final negotiation and execution by 0 6/29/26* the City Admin Preconstruction 184 6/29/26 3/26/27
PRECON_1000 City Issues NTP for Design 0 6/29/26
PRECON_1300 DBE Completes Planning Submittal 10 6/29/26 7/13/26 PRECON_1040 DBE Completes 50% Design Development (DD) 20 6/29/26 7/27/26 PRECON_1310 Planning Review of Planning Submittal 20 7/14/26 8/10/26 PRECON_1080 City Review of 50% DD 10 7/28/26 8/10/26
PRECON_1090 DBE Provides 50% DD Estimate 15 7/28/26 8/17/26 PRECON_1100 DBE Completes 100% DD 20 8/4/26 8/31/26
PRECON_1320 Revisions to Planning Submittal 5 8/11/26 8/17/26 PRECON_1330 Planning deems Application Complete 20 8/18/26 9/15/26 PRECON_1290 City Review of 100% DD 10 9/1/26 9/15/26
PRECON_1120 DBE Provides 100% DD Estimate 15 9/1/26 9/22/26 PRECON_1210 Process PG&E Service Application/ Design 20 9/1/26 9/29/26 PRECON_1350 City Council Presentations 20 9/1/26 9/29/26 PRECON_1130 DBE Completes 30% Construction Documents (CD) 15 9/9/26 9/29/26 PRECON_1340 Planning Staff Report 20 9/16/26 10/14/26
PRECON_1190 Long-Lead Procurement Releases Begin 0 9/29/26 PRECON_1150 DBE Provides 30% CD Estimate 15 9/30/26 10/21/26 PRECON_1140 City Review of 30% CD 20 9/30/26 10/28/26
PRECON_1160 DBE Completes 60% CD 20 10/7/26 11/4/26
PRECON_1360 Two Presentations to the DRC or Planning Comm 40 10/15/26 12/14/26 PRECON_1170 City Review of 60% CD 20 11/5/26 12/7/26
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2026 2027 2028
RFQ/P distributed to prospective DBEs and advertised
Deadline for RFQ/P Questions and Comments
Response to RFQ/P Questions Emailed
RFQ/P Submissions due to the City of Gilroy
Selection Committee evaluates RFQ submissions and selects up to four DBE for Pre-Approved List Interviews with Pre-Approved DBE
E-Mail Notice provided to all Pre-Approved DBE of decision City and chosen DBE initiate work on Design-Build Agreement City Council authorizes award of Design-Build Agreement subject to final negotiation and execution by the City Admin City Issues NTP for Design
DBE Completes Planning Submittal
DBE Completes 50% Design Development (DD)
Planning Review of Planning Submittal
City Review of 50% DD
DBE Provides 50% DD Estimate
DBE Completes 100% DD
Revisions to Planning Submittal
Planning deems Application Complete
City Review of 100% DD
DBE Provides 100% DD Estimate
Process PG&E Service Application/ Design
City Council Presentations
DBE Completes 30% Construction Documents (CD)
Planning Staff Report
Long-Lead Procurement Releases Begin
DBE Provides 30% CD Estimate
City Review of 30% CD
DBE Completes 60% CD
Two Presentations to the DRC or Planning Comm
City Review of 60% CD
CITY OF GILROY | SANTA TERESA FIRE STATION

PROPOSED PROJECT SCHEDULE

PROPOSED PROJECT SCHEDULE
CITY OF GILROY | SANTA TERESA FIRE STATION

GILROY, CA
ZUMWALT PROJECT NUMBER: TBD
DATA DATE: 4/24/26
PAGE NO. 1 OF 2
Remaining Level of Effort
Actual Level of Effort
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Date Revision Checked Approved
6/2/26 0 JB TP

Page 54 of 256 ends

Activity ID Activity Name Orig Dur Start Finish
PRECON_1180 DBE Provides 60% CD Estimate 20 11/5/26 12/7/26 PRECON_1200 DBE Completes 95% CD 20 11/5/26 12/7/26
PRECON_1110 City Review of 95% CD 10 12/8/26 12/21/26
PRECON_1230 DBE Completes and Submits Plan Check Submittal 20 12/8/26 1/6/27 PRECON_1220 DBE Provides Final Estimate 25 12/8/26 1/13/27 PRECON_1370 City Council Presentation 20 12/15/26 1/13/27 PRECON_1240 City Plan Check Review 20 1/7/27 2/4/27
PRECON_1250 DBE Completes and Submits Back Check Submittal 15 2/5/27 2/26/27 PRECON_1270 City Back Check Review 15 3/1/27 3/19/27
PRECON_1260 City Issues Permit Approval 0 3/19/27
PRECON_1280 City Issues NTP for Construction 0 3/26/27
Construction 260 3/26/27 4/10/28
CONST_1000 Construction 260 3/26/27 4/10/28
Closeout 35 4/10/28 5/30/28
CLS_1000 Substantial Completion 0 4/10/28
CLS_1010 Final Cleaning 5 4/11/28 4/17/28
CLS_1020 Prepare and Deliver As-Built Drawings and Record Documents 5 4/11/28 4/17/28 CLS_1030 Prepare and Submit Warranties, Manuals, and Certifications 5 4/11/28 4/17/28 CLS_1040 Startup and Testing 10 4/11/28 4/24/28
CLS_1050 Punchlist Walk 10 4/18/28 5/1/28
CLS_1060 Owner Training 10 4/18/28 5/1/28
CLS_1070 Commissioning 15 4/25/28 5/15/28
CLS_1080 Punchlist Corrections 20 5/2/28 5/30/28
CLS_1090 Final Inspection and Acceptance 5 5/16/28 5/22/28 CLS_1100 Final Completion 0 5/30/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2026 2027 2028
DBE Provides 60% CD Estimate
DBE Completes 95% CD
City Review of 95% CD
DBE Completes and Submits Plan Check Submittal
DBE Provides Final Estimate
City Council Presentation
City Plan Check Review
DBE Completes and Submits Back Check Submittal
City Back Check Review
City Issues Permit Approval
City Issues NTP for Construction
Construction
Substantial Completion
Final Cleaning
Prepare and Deliver As-Built Drawings and Record Documents Prepare and Submit Warranties, Manuals, and Certifications Startup and Testing
Punchlist Walk
Owner Training
Commissioning
Punchlist Corrections
Final Inspection and Acceptance
Final Completion
CITY OF GILROY | SANTA TERESA FIRE STATION

PROPOSED PROJECT SCHEDULE

PROPOSED PROJECT SCHEDULE
CITY OF GILROY | SANTA TERESA FIRE STATION

GILROY, CA
ZUMWALT PROJECT NUMBER: TBD
DATA DATE: 4/24/26
PAGE NO. 2 OF 2
Remaining Level of Effort
Actual Level of Effort
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Date Revision Checked Approved
6/2/26 0 JB TP

Page 55 of 256 ends

City of Gilroy
Public Works Department
ATTN: RYAN OSENTON

CITY OF GILROY
7351 ROSANNA STREET
GILROY, CA 95020-6197
Proposals Due by:
4:00 PM, Thursday, May 28, 2026
Request for Qualifications and Proposals
Santa Teresa Fire Station
Construction Project
No. 26-RFQ/P PW-536

Page 56 of 256 ends

Request for Qualifications and Proposals
No. 26-RFQ/P-PW-536
Santa Teresa Fire Station Construction Project
Notice is hereby given that the Purchasing Coordinator of the City of Gilroy at 7351 Rosanna Street, Gilroy, CA 95020-6197 is soliciting Qualification Statement Submittals and Sealed Cost Proposals from qualified firms to complete the Design-Build of the new Santa Teresa Fire Station Construction Project No. 26-RFQ/P-PW-536 as described in the attached Request for Qualifications. Submittals will be accepted up until 4:00 PM, Thursday, May 28, 2026. All Design-Build Entities are required to submit five (5) hard copies of their Qualification Statement Submittals and Sealed Cost Proposals, as well as a USB containing both documents. Proposals received after that time and date will not be considered. The City of Gilroy accepts no responsibility if delivery is made to another location other than location specified above and/or delayed deliveries by your chosen carrier. An evaluation team will review submitted qualifications and select up to four of the best qualified firms to move into the Proposal Evaluation round, where proposals will be evaluated and scored to determine the bid winner. The selected Design-Build Entity will then be recommended to the City Council for an agreement to complete the project.

A free electronic copy of the RFQ/P can be obtained by going to the City of Gilroy website (www.cityofgilroy.org).

RespectfullyRequested,
Carina Baksa
Purchasing Coordinator

Page 57 of 256 ends

i
Table of Contents
Request for Qualifications and Proposals....................................................................................... 0 STATEMENT OF QUALIFICATIONS SUBMITTAL CHECKLIST ......................................... 2 ADDENDA ACKNOWLEDGEMENT ......................................................................................... 3 RFQ/P OVERVIEW....................................................................................................................... 4 Introduction ................................................................................................................................. 4 Overview--Intent and Selection Process ..................................................................................... 5 Project Needs and Core Objectives............................................................................................. 5 Schedule ...................................................................................................................................... 6 Proposal Submittal .................................................................................................................... 11 EVALUATION AND SELECTION PROCESS.......................................................................... 12 A. General ................................................................................................................................. 12 B. Responsiveness and Minimum Requirements (Pass/Fail).................................................... 12 STEP 1 – QUALIFICATIONS EVALUATION (SOQ) .............................................................. 14

1. Firm and Design-Build Team Qualifications (20 Points) ..................................................... 14

2. Key Personnel and Organizational Structure (20 Points)...................................................... 14

3. Relevant Project Experience and Past Performance (20 Points)........................................... 14

4. Project Understanding and Approach (20 Points)................................................................. 14

5. Schedule Approach and Delivery Capability (10 Points) ..................................................... 15

6. Project Controls and Risk Management (5 Points) ............................................................... 15

7. Subcontractor Strategy and Market Approach (5 Points) ..................................................... 15 STEP 2 – PROPOSAL EVALUATION (BEST VALUE)........................................................... 16

1. Price / Lump Sum Proposal (50 Points)................................................................................ 16

2. Project Schedule (10 Points) ................................................................................................. 17

3. Interview / Oral Presentation (40 Points).............................................................................. 17 Clarifications............................................................................................................................. 17 Best Value Determination ......................................................................................................... 17 Tie-Breaker................................................................................................................................ 17 Deadline for Receipt of Submissions........................................................................................ 18 RFQ/P Questions....................................................................................................................... 18 ATTACHMENT 1 - DESIGN-BUILD AND PROGRESSIVE DESIGN-BUILD CONFLICT OF

INTEREST POLICY AND GUIDELINES
ATTACHMENT 2 - SAMPLE AGREEMENT FOR SERVICES, SCOPE OF WORK

DOCUMENTS, AND INDEX OF CRITERIA DOCUMENTS

Page 58 of 256 ends

ii
26-RFQ/P-PW-536
Santa Teresa Fire Station Construction Project
Table of Contents

STATEMENT OF QUALIFICATIONS SUBMITTAL CHECKLIST

SANTA TERESA FIRE STATION CONSTRUCTION PROJECT
26-RFQ/P-PW-536
_________________________________________________________________ 
NOTICE

In order to be eligible to submit for this RFQ/P, all interested parties are requested to send an email to Ryan Osenton no later than 5:00 PM, May 12, 2026 at the following email address:

[email protected]
Please include the following information in your email:
• Contractor Name
• Address
• Email address
• Telephone No.
• Re: 26-RFQ/P-PW-536
This information will be used to send you addendums (if any). Failure to acknowledge addendums (if any) may cause your submittal to be judged non-responsive. __________________________________________________________________ The following documents/information must be filled out and/or included in the submittal in order to be considered for this project:
❑ 5 copies of Contractor Qualifications & required attachments & supporting information, as well as electronic copy of all documents in a USB card. ❑ 5 sealed copies of Contractor Cost Proposals, required attachments, & supporting information, as well as electronic copy of all documents in a USB card. ❑ Acknowledgement of Addenda numbers have been received (if any) and have been examined as part of the RFQ/P documents (see Addenda Acknowledgement page below). ❑ Deliver submittal package to City of Gilroy at address given by 4:00 PM, May 28, 2026.

Page 59 of 256 ends

iii

ADDENDA ACKNOWLEDGEMENT
We acknowledge that the following addenda have been received and have been examined as part of the RFQ/P documents:

Addendum
No. Date Received Initials
__________________________________
Signature
__________________________________ _____________________________________ Printed Name Date

Page 60 of 256 ends

iv

RFQ/P OVERVIEW
Introduction
The City of Gilroy is a charter city located in southern Santa Clara County with a population of approximately 60,000. The City is a council-administrator form of government with the mayor elected at large for a four-year term and six City Councilmembers who are elected at large for four-year terms. Development activity in the original Gilroy town site dates back to the early 1800’s, with the City formally incorporating in 1870. Since then, the City has experienced several annexations and growth periods throughout the 20th and 21st centuries.

Information regarding the City and its organization, such as government structure, services provided, the current Operating and Capital Budgets, Annual Financial Reports, and the most recent Comprehensive Fee Schedule, is available on the City website at www.cityofgilroy.org.

The Santa Teresa Fire Station Construction Project (Project) will establish a modern, highperforming hub for fire and emergency response services in the City of Gilroy, advancing the City’s public safety capabilities through a thoughtfully phased, design-build approach. Located at the southeast corner of West Luchessa Avenue and Miller Avenue, the project will deliver a codecompliant, resilient facility designed to support fire personnel with efficient operations, durable infrastructure, and long-term adaptability. The Santa Teresa Fire Station is intended to serve Gilroy’s growing community by strengthening emergency response capabilities and enhancing public safety services for decades to come.

The City of Gilroy is seeking interested and qualified contractors to submit statements of qualification about your firm’s ability to provide Design-Build Construction Services to the City for the construction of the new Santa Teresa Fire Station, and a separate sealed Cost Proposal to be evaluated if your firm advances through the Qualifications Evaluation. The Project will be delivered using a Design-Build delivery method under a single Agreement between the City and the Design-Build Entity (DBE). A Notice to Proceed will be issued upon the City’s acceptance of the Guaranteed Maximum Price, agreement on the Project Schedule and Completion Date, and execution of an Agreement confirming these terms. All work products and electronic files produced by the DBE shall become the property of the City and may be used by the City for any purpose, including continuation of the Project with another DBE should the need arise.

The City intends to select a DBE consisting of a general contractor, architect, key sub consultants, and key trade contractors (collectively the Design-Build Entity or DBE) based on the evaluation process outlined in this RFQ/P. Your submission should clearly demonstrate how your firm’s resources and expertise can meet the construction needs of the City’s project. This Request for Qualifications and Proposal (RFQ/P) outlines the general scope of the City's project construction needs.

Page 61 of 256 ends

v
Overview-Intent and Selection Process
The intent of this RFQ/P is as follows:
• To evaluate and select up to four DBE, based on Statement of Qualifications, to move into the Cost Proposal evaluation.
• To evaluate and select one DBE from the Cost Proposals to be recommended to City Council for contract award to provide Design-Build Services for the Santa Teresa Fire Station Construction Project.

The RFQ/P for the Santa Teresa Fire Station Construction Project will follow a two-step process.

Any interested DBE will submit two separately sealed proposals. The first proposal will be your Statement of Qualifications. The City will evaluate each interested DBE’s specific qualifications and experience in construction of Design-Build projects and select up to four of the best qualified firms to advance into the second round of review. The selected firms will be notified of their advancement into the Design-Build Construction Services Proposals Evaluation Process by the City. The City and its consultant team will review the sealed Cost Proposals for evaluation and scoring. Following initial review and scoring, interviews will be held with the pre-approved firms.

The City will select one of the pre-approved firms to be recommended to the City Council for the Design-Build Agreement (Agreement).

The Agreement is subject to approval by the Gilroy City Council, and the Council reserves the right to not award any such Agreement. The City also reserves the right to select a non-preapproved firm through a separate selection process if it determines that the needs of the City are best served by doing so.

Project Needs and Core Objectives
The City of Gilroy is seeking a qualified and collaborative Design-Build Entity (DBE) to deliver the Santa Teresa Fire Station in a manner that advances the City’s long term public safety goals while remaining cost effective, innovative, and responsive to the community. The City, through its project management consultant, Griffin Structures, Inc., will be involved in managing the project, attending pre-construction and periodic construction status meetings, as well as problem solving and approving change orders. The City will rely on the DBE for daily management of the Project. The selected DBE will be expected to align with the following core objectives:

1. Expedited Delivery
A primary objective of the project is timely delivery. The DBE is expected to mobilize promptly, proactively coordinate design and construction activities, and sequence work efficiently to bring the Santa Teresa Fire Station online as early as practicable.

2. Cost Effectiveness and Ingenuity
The City is committed to delivering a high-quality facility within available funding. The DBE should propose creative and cost-conscious solutions that maintain operational functionality, durability, and constructability while identifying opportunities for long term value and lifecycle cost savings. Value based decision making and efficiency in delivery are strongly encouraged.

3. Integrated Design and Construction Schedule

Page 62 of 256 ends

vi
The project will be delivered using a design build approach. The DBE will receive 100 percent schematic level bridging documents and associated performance criteria, which are provided as Attachment 2, and will be responsible for advancing the project through design development, construction documents, permitting, and construction. A coordinated and proactive schedule that advances design and construction concurrently is critical to achieving project goals. The DBE shall also be responsible for coordination, design, and delivery of all required utility services, including off-site improvements and coordination with applicable agencies.

4. High Quality, Functional, and Future Ready Design
The completed facility must support the operational, safety, and wellness needs of today’s fire personnel while allowing for future adaptability. This includes efficient space planning, durable and low maintenance materials, and thoughtful design strategies that enhance response times, resilience, and long-term performance.

5. Collaborative and Transparent Delivery Approach
A strong and integrated working relationship among the DBE, the design team, and City stakeholders is essential to project success. The DBE must demonstrate a collaborative team structure, clear and proactive communication practices, and a proven track record delivering public sector design build projects, particularly fire stations or other public safety facilities.

Schedule
A draft schedule for this RFQ/P is given below. Please keep in mind that schedules are subject to change.

RFQ/P Schedule Target Date(s)
RFQ/P distributed to prospective DBEs and advertised April 24, 2026 Deadline for RFQ/P Questions and Comments (5:00 PM) May 12, 2026 Response to RFQ/P Questions Emailed (4:00 PM) May 14, 2026 RFQ/P Submissions due to the City of Gilroy ( 4:00 PM) May 28, 2026 Selection Committee evaluates RFQ submissions and selects up to four DBE for Pre-Approved list
Week of June 1,
2026
Interviews with Pre-Approved DBE June 16, 2026
E-Mail Notice provided to all Pre-Approved DBE of decision June 19, 2026 City and chosen DBE initiate work on Design-Build Agreement June 22, 2026 City Council authorizes award of Design-Build Agreement subject to final negotiation and execution by the City Administrator June 29, 2026
Special City
Council Meeting
The City requests that all DBE’s submitting proposals set aside June 16, 2026, for potential interview sessions. The City is operating on a tight timeline and will need to conduct interviews on that date. City staff will notify DBE’s that advance to the interview stage on June 1, 2026, and will schedule the interviews at that time.

Page 63 of 256 ends

vii
General Information

1. General Services. The City invites qualified DBEs to submit a Response which sets forth its ability to provide the Services, as more fully indicated herein. DBEs must have extensive experience with the Uniform Building Code (“UBC”), Title 24 of the California Code of Regulations. DBEs must have experience in the design and construction of public facilities, preferably fire stations, under both the Public Contract Code’s formal bidding process and under alternative construction delivery methods.

2. Design-Build Entity. An eligible DBE under Public Contract Code section 22161 (d), means a corporation, limited partnership, partnership, or other association that is capable of providing appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build Agreement. Nothing in this RFQ/P is intended nor should be interpreted as contravening the provisions of the Public Contract Code. The DBE shall be fully knowledgeable of, and shall comply with, the provisions of Public Contract Code section 22161, et seq.

3. Project / Program Consultant. The City has, at its expense, retained the services of a construction/project manager to ensure compliance with agreed-upon specifications and other requirements.

4. Contract Requirements. A Design-Build Agreement between the City and the selected DBE will be executed that will outline the full requirements and expectations of the Project.

5. Indemnity. Pursuant to Public Contract Code section 20103.6, the Agreement with the DBE includes language requiring the Designer/Builder to indemnify the City to the furthest extent permitted by California law.

6. Skilled and Trained Workforce. Public Contract Code section 22164 (c) (1) states that a DBE must provide “an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades in accordance with Section 2600 of the Public Contract Code.”

7. Bonds & Insurance. Pursuant to the Agreement, the DBE shall be required to obtain:
a. A payment bond and performance bond to cover the contract amount for non-design services; and
b. Errors and omissions insurance coverage sufficient to cover all design and architectural services provided in the Agreement.

8. Pre-Qualification. All proposers must submit by the date indicated in the RFQ/P Schedule. The City will notify each DBE of their prequalification status by the date indicated in the RFQ/P Schedule. The City will select up to four DBE to proceed with the proposal evaluation process.

9. Proposals Evaluation. The Pre-Approved proposers will be notified of their advancement into the Design-Build Construction Services Proposals Evaluation Process by the City. City

Page 64 of 256 ends

viii
staff will review their sealed Cost Proposals for evaluation and scoring. Following interviews, the City will select one of the pre-approved firms to be recommended to the City Council for an agreement to complete the project.

10. Conflicts of Interest. Public Contract Code section 22162(c) requires the City to develop an organizational conflict-of-interest policy regarding the ability of a person or entity that performs services for the City relating to the solicitation of a design-build project to submit a proposal as DBE or to join a DBE team. The City’s organizational conflict-ofinterest policy is included in Attachment 1. The City will strictly evaluate any potential or actual conflicts of interest to ensure avoiding even the appearance of impropriety in the procurement and performance of the services for the Project. The DBE selected to provide the Services will not be permitted to have any subsidiary, parent, holding company or affiliate of the selected DBE perform any construction work or submit a bid for the Project, without the prior written approval of the City that sufficiently addresses the conflict of interest issues, to the sole discretion of the City.

The following entities are currently retained by the City and/or City’s consultants to assist in the development of the bridging and criteria documents and are precluded from being part of any DBE team:

Entity Services
LPA Design Studios Bridging Documents Architect
Geocon Consulting Geotechnical Consultant
Additional General Information

1. Addenda. If it becomes necessary to revise any part of this RFQ/P, an addendum or revision will be transmitted to all prospective DBEs by email.

2. Right to Reject. The City reserves the right to reject any or all submittals, or any part of the submittal, to waive minor technicalities, or to solicit new submittals on the same project, or on a modified project, which may include portions of the originally proposed project as the City may deem necessary in its interest.

Submittals may be rejected for any alterations of form, additions or alternates not called for, incomplete submittals, erasures or irregularities of any kind.

3. False or Misleading Statements. Any submittals containing, in the opinion of the City, false or misleading statements will be rejected.

4. Incurring Costs. The City of Gilroy will not pay costs incurred in qualification submittal preparation, printing, or the negotiation process. All such costs shall be borne by the submitting DBE.

Page 65 of 256 ends

ix

5. News Release. News releases pertaining to this RFQ/P or to the award of a contract shall not be made without the prior written approval of the City.

6. Clarification of Submittals. The City reserves the right to obtain clarification information of any point in any DBE’s submittal or to obtain additional related information necessary to properly evaluate the submittal. Failure of a DBE to respond to a request for more information may result in the submittal being rejected.

7. Disclosure of Submittal Information. All submittals become a matter of public record once an Agreement is awarded. If a prospective DBE wishes to submit information that is considered confidential or proprietary, they must indicate in the submittal which portions of the material are confidential or proprietary, and why it is proprietary. The City will make reasonable efforts to protect the confidentiality of such material but makes no guarantees that such material may be protected. Entire submittals designated as confidential may be rejected. Prospective DBE’s must understand that the City must abide by the California Public Records Act (Government Code 6250, et seq.).

8. City Use of RFQ/P Ideas. The City reserves the right to use any or all prospective DBE service and project approach ideas presented. Selection or rejection of a DBE does not affect this right.

9. Reliance on Information. DBEs may rely only upon written information and/or instructions from the City, and the City shall not be responsible for any oral information and/or instructions given with regard to this RFQ/P.

Any City response to a request for clarification by a DBE may be made in the form of an addendum to the RFQ/P, DBEs should await responses to inquiries prior to delivering their submittal. City response will be by email. All submitting DBEs shall provide the City with their email address.

Additionally, the DBE may rely on the bridging documents for program and performance intent; however, the DBE shall be responsible for the completeness, coordination, constructability, and code compliance of the final design.

10. Notification of Withdrawal of Submittal. Proposer may modify or withdraw their submittal prior to the date and time specified for submittal submission by an authorized representative of that organization or by formal written notice. Submittals will become the property of the City of Gilroy after the submission deadline.

11. DIR Registration and Compliance Requirements. The DBE and all subcontractors, of every tier, shall be registered with a valid registration number from the Department of Industrial Relations pursuant to Labor Code §§ 1725.5 and 1771.1 for the duration of time that the DBE is performing the work under the construction documents. Neither the DBE nor any subcontractor shall be qualified to submit a Bid/Proposal or be listed in a Proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of work under the Agreement documents unless currently registered and qualified to perform public work pursuant to Section Labor Code §1725.5. The DBE shall not enter any subcontract without proof of the potential subcontractor’s registration. If an unregistered contractor submits a Proposal, the City will deem such Proposal as nonresponsive. If any unregistered contractor or subcontractor performs work on this Project at any time, the City has the right to terminate the Agreement for cause.

Page 66 of 256 ends

x

12. Wage Rates. The DBE is required to comply with all applicable prevailing wage requirements and/or regulations, including but not limited to California Labor Code section 1773 et seq., and those requirements and regulations are deemed included in the proposal documents. State prevailing wage requirements are published by the Director of the State of California Department of Industrial Relations and may be found online at www.dir.ca.gov/.

13. Equal Employment Opportunity. The DBE shall comply with all applicable federal, state, and local laws, rules, and regulations regarding non-discrimination in employment because of race, color, ancestry, national origin, religion, sex, marital status, age, medical conditions, disability, or any other lawful reason.

14. Safety. Safety of City workers, the DBE’s workers and the general public is of primary importance to the City. The DBE and all sub-Contractors (if any) must adhere to all applicable federal, state, and City rules, regulations, and policies related to the safe execution of the work to be performed. This includes the use of proper safety gear (e.g., eye protection, hearing protection, reflective safety vests, etc.), and traffic control measures as per the Manual of Uniform Traffic Control Devices (latest edition), or other regulations as applicable. The City reserves the right to halt work in the event safety rules/regulations are not being followed until corrected to the satisfaction of the City.

15. License. In addition to all other requirements set forth in the Agreement, the successful DBE to whom the Agreement is awarded along with any subcontractors must obtain and keep in force throughout the progress of the service, a valid City of Gilroy Business License issued by the City of Gilroy prior to or concurrently with delivery of the executed Agreement.

16. Agreement Period. The Agreement, once approved by the City Council, is for the duration of the construction and closeout phase.

Submission Requirements
Statement of Qualifications (SOQ)
SOQs shall not exceed thirty (30) pages, excluding cover letter, table of contents, tabs, resumes, and required forms.

The SOQ shall include the following:

1. A dated Letter of Interest must be submitted, including the legal name of the DBE, address, telephone, emails, and the name, title, and signature of the person authorized to submit the SOQ on behalf of the DBE. Firm and Design-Build Team Qualifications

2. Key Personnel and Organizational Structure. Please include detail on how the DBE complies with applicable statutory requirements of the Business and Professions Code and Public Contract Code section 22161, et seq., including section 22161, which states:

Page 67 of 256 ends

xi
(c) ‘Design-build’ means a procurement process in which both the design and construction of a project are procured from a single entity. (d) ‘Design-build entity’ means a corporation, limited partnership, partnership, or other association that is capable of providing appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.

3. Relevant Project Experience and Past Performance

4. Project Understanding and Approach

5. Schedule Approach and Delivery Capability including work commitments that might conflict with this Project.

6. Project Controls, Risk Management, and Agreement Exceptions

7. Subcontractor Strategy and Market Approach

8. Safety Record

9. Any requested Agreement exceptions. If a DBE has any comments or objections to the Sample Agreement attached hereto as Attachment 2 to this RFQ/P, it shall provide those comments or objections with specificity in its SOQ.

Cost Proposal Submittal
Proposal submittals shall be limited to ten (10) pages maximum, excluding the price proposal form. The required one (1) page CPM schedule shall be included within the page limit.

The Proposal shall include the following:

1. Price Proposal (submitted separately)

2. Project Schedule (one-page CPM)

Page 68 of 256 ends

xii

EVALUATION AND SELECTION PROCESS
A. General
The City will utilize a two-step selection process to identify the Design-Build Entity (DBE) that provides the best value for the Santa Teresa Fire Station Project. The process will consist of:

1. Step 1 – Qualifications Evaluation (Statement of Qualifications)

2. Step 2 – Proposal Evaluation (Best Value Determination) Only those firms determined to be most qualified in Step 1 will advance to Step 2. The award will be made to the proposer whose proposal represents the best value to the City, based on a combination of price and qualitative factors, in accordance with applicable provisions of the California Public Contract Code.

B. Responsiveness and Minimum Requirements (Pass/Fail)
Prior to evaluation, all submittals will be reviewed for responsiveness and minimum qualifications. Failure to meet any of the following requirements may result in the submittal being deemed non-responsive and rejected without further evaluation.

Proposers shall meet the following minimum requirements:
• Valid California Contractor’s License (Class B), held and active for a minimum of five (5) years without revocation or suspension
• Current DIR Public Works Contractor Registration
• Not currently debarred, disqualified, or otherwise ineligible to perform public works under California Labor Code
• Submission of all completed and signed required forms and acknowledgements • Acceptance of the City’s Agreement requirements (or clearly identified exceptions) • Submittal prepared and delivered in accordance with the requirements of this RFQ/P Proposers shall also provide a description of any violations, assessments, or penalties related to prevailing wage, apprenticeship, or labor compliance laws within the past five (5) years, including resolution status. This will not be cause for disqualification, however, the City will consider these factors as part of the subsequent SOQ review processes.

Page 69 of 256 ends

xiii
Additionally, proposers must answer the following questions. Responses that do not meet the criteria identified below may result in disqualification.

Pass/Fail Questions (Essential Criteria)

1. Relevant Project Experience
Has your Firm contracted for and completed construction of a minimum of:
• Three (3) California public projects,
• Each with a value of at least $5,000,000, and
• All within the past five (5) years? (Please circle one) NOTE: You must list these projects in the as part of “Project References” in Step 1, category 3.

YES NO
NO = cannot
prequalify

2. Contractor Licensing
Does your firm currently hold all required contractor’s license(s) necessary to perform the work, and have those license(s) been continuously active for at least five (5) years without revocation or suspension? (Please circle one) YES NO
NO = cannot
prequalify

3. Debarment / Responsibility Status
Has your firm or any associated firm been found non-responsible, debarred, disqualified, or otherwise prohibited from bidding on or performing public works in California within the past five (5) years? (Please circle one) YES NO
YES =
cannot
prequalify

4. Contract Default or Termination
Has your firm or any associated firm defaulted on a contract or been terminated for cause by a public agency within California within the past five (5) years, where such default or termination was upheld by a court or arbitrator? (Please circle one)
YES NO
YES =
cannot
prequalify

5. Criminal Convictions
Has your firm, any associated firm, or any of their owners or officers been convicted within the past ten (10) years of a crime involving:
• Bidding, awarding, or performance of a public contract • False claims to a public entity
• Fraud, theft, or other acts of dishonesty (Please circle one) YES NO
YES =
cannot
prequalify

6. Surety / Bonding Issues
Within the past five (5) years, has a performance bond surety for your firm or any associated firm been required to:
• Take over or complete a project
• Supervise the work of a project
• Pay amounts to third parties (Please circle one)
YES NO
YES =
cannot
prequalify
If you answered:
“NO” to questions 1-2 or
“YES” to questions 3-6, then STOP.

You are not eligible for prequalification at this time.

Page 70 of 256 ends

xiv
STEP 1 – QUALIFICATIONS EVALUATION (SOQ)
(Maximum 100 Points)
Evaluation in this phase is based on demonstrated qualifications, experience, and general approach. Project-specific pricing, means and methods, and schedule commitments will not be evaluated until Step 2. The City will evaluate Statements of Qualifications and shortlist up to four (4) of the highest-ranked firms to advance to the Proposal Evaluation phase.

1. Firm and Design-Build Team Qualifications (20 Points) Evaluation will consider:
• Demonstrated experience delivering Design-Build projects of similar size, scope, and complexity
• Experience with public agency projects, particularly fire stations or public safety facilities • Experience advancing projects from schematic-level or bridging documents through construction

2. Key Personnel and Organizational Structure (20 Points) Evaluation will consider:
• Qualifications and relevant experience of proposed key personnel (Project Manager, Superintendent, Lead Designer, etc.)
• Demonstrated success of the proposed team working together • Clarity of roles, responsibilities, and team integration Note: Key personnel identified in the Proposal shall not be replaced without prior written approval from the City.

3. Relevant Project Experience and Past Performance (20 Points) Evaluation will consider:
• Successful completion of similar projects (size, scope, delivery method) • Performance related to budget adherence, schedule compliance, and quality • Owner references and overall client satisfaction
• History of claims, disputes, or terminations
• Safety performance and demonstrated commitment to jobsite safety

4. Project Understanding and Approach (20 Points)
Evaluation will consider:
• Demonstrated understanding of the Project goals, constraints, and priorities • General approach to delivering Design-Build projects using bridging documents

Page 71 of 256 ends

xv
• Approach to collaboration, communication, and coordination with public agencies

5. Schedule Approach and Delivery Capability (10 Points) Evaluation will consider:
• Demonstrated ability to deliver projects on or ahead of schedule • General approach to developing and managing project schedules • Experience with overlapping design and construction activities (fast-tracked delivery) • Identification of typical schedule risks and mitigation strategies • Approach to identifying and procuring long-lead items to support expedited delivery

6. Project Controls and Risk Management (5 Points)
Evaluation will consider:
• Approach to cost tracking and budget management
• Identification and management of project risks

7. Subcontractor Strategy and Market Approach (5 Points) Evaluation will consider:
• Identification of key subcontractors and trade partners • Approach to subcontractor procurement and management
Note: Upon completion of the Step 1 evaluation, the City will rank firms based on total scores and may shortlist up to four (4) of the highest-ranked proposers to proceed to Step 2. Scores from Step 1 will not carry forward to Step 2.

Page 72 of 256 ends

xvi
STEP 2 – PROPOSAL EVALUATION (BEST VALUE)
(Maximum 100 Points)
Only those firms shortlisted through the Qualifications Evaluation phase will have their sealed proposals opened and evaluated. The purpose of Step 2 is to evaluate each proposer’s price proposal and confirm the capability of the proposed team to successfully deliver this specific Project. The City will not re-evaluate general qualifications or experience in this phase.

1. Price / Lump Sum Proposal (50 Points)
Price will be evaluated using the following formula:

Score = (Lowest Responsive Proposal Price ÷ Proposer’s Price) × 50 The lowest responsive proposal will receive the maximum score. The proposed price shall include all costs necessary to complete the Project in accordance with the Agreement Documents, including design, construction, general conditions, overhead, profit, bonds, insurance, and all associated services.

As part of the Lump Sum Proposal, Proposers shall provide a summary of the proposed Contract Sum organized by major cost components, including:
• Design services
• General conditions/general requirements
• Construction
• Overhead and profit
• Allowances
• Contingency
Detailed trade-level pricing is not required. Contingencies shall be clearly identified and will be reconciled to actual costs, with any unused amounts credited to the City. Proposers shall also identify key clarifications and exclusions associated with their Proposal, including those related to site conditions, utilities, permitting, and the completeness of the bridging documents.

The Proposal Price shall represent the Proposer’s committed Contract Sum to deliver the Project based on the bridging documents and performance criteria provided. Following award, the selected Design-Builder will be responsible for advancing the design and completing the Project within the proposed Contract Sum, subject to adjustments only as permitted under the Agreement.

The City reserves the right to request negotiated time-and-materials rates from the selected DBE for use in evaluating potential change orders or additional services. Such rates will not be used as part of the proposal evaluation.

Page 73 of 256 ends

xvii

2. Project Schedule (10 Points)
Proposers shall provide a one (1) page Critical Path Method (CPM) schedule illustrating major design, approval, procurement, and construction activities. Evaluation will consider:
• Logical sequencing of major activities
• Identification of key milestones and critical path
• Overall reasonableness and alignment with the City’s desired timeline • Demonstrated understanding of schedule drivers for this Project • Identification of opportunities for early work packages or phased construction to support expedited delivery

3. Interview / Oral Presentation (40 Points)
Shortlisted proposers will be invited to participate in an interview with the City’s Selection Committee. It will be at the City’s discretion as to whether interviews will be held in-person or virtually. Please hold June 16, 2026 (all day) for potential interview.

The purpose of the interview is to:
• Validate the proposer’s understanding of the Project
• Confirm the team’s ability to successfully execute the work • Evaluate communication, collaboration, and problem-solving capabilities The City may include a scenario-based discussion or charrette as part of the interview process. Evaluation will be limited to the criteria identified above.

Clarifications
The City reserves the right to request written clarifications from proposers during the evaluation process. Clarifications shall not result in any change to the proposer’s price.

Best Value Determination
The Selection Committee will evaluate and score all proposals and recommend the proposer that, in its judgment, provides the best value to the City based on the criteria set forth herein. The City reserves the right to:
• Reject any or all proposals
• Waive minor irregularities
• Negotiate with the highest-ranked proposer
If an agreement cannot be reached, the City may proceed with the next highest-ranked proposer.

Tie-Breaker
In the event of a tie:

Page 74 of 256 ends

xviii

1. The proposer with the higher Interview score will be ranked higher

2. If still tied, the proposer with the lower price will be ranked higher Response Submission
Each responding DBE must provide five (5) printed copies of the SOQ along with an electronic version on a USB card) as well as five (5) printed copies of the Proposal and USB card in a separate sealed envelope identified as “PROPOSAL FOR SANTA TERESA FIRE STATION” the address noted below. It is recommended that you provide an email along with information regarding anticipated delivery of the package to [email protected], with a copy to [email protected]. The email shall refer to the DBE’s company name and “Santa Teresa Fire Station Construction Project Qualifications and Proposal”. All submissions must be sealed in a package showing the following information on the outside and addressed to:

Attn: Carina Baksa
City of Gilroy - Purchasing Division
7351 Rosanna Street
Gilroy, CA 95020
RE: No. 26-RFQ/P-PW-536
Santa Teresa Fire Station Construction Project
The submission package must be delivered to the above address prior to the deadline for receipts of submissions. All respondents who mail or ship their submissions must allow sufficient delivery time to ensure receipt of their submissions by the time specified. Late submissions will be considered non-responsive.

Deadline for Receipt of Submissions
All submissions must be received by the Purchasing Division, City of Gilroy, 7351 Rosanna Street, Gilroy, CA, 95020 by 4:00 P.M. on Thursday, May 28, 2026.

RFQ/P Questions
Direct questions regarding this RFQ/P, via email, no later than Tuesday, May 12, 2026, at 5:00 PM to the following:

Ryan Osenton, Project Manager
(408) 846-0277
[email protected]
and
Nisha Patel, City Engineer
(408) 846-0531
[email protected]

Page 75 of 256 ends

1 ATTACHMENT 1 -

DESIGN-BUILD AND PROGRESSIVE DESIGN-BUILD

CONFLICT OF INTEREST POLICY AND GUIDELINES
A Contractor that enters into an initial contract to perform pre-construction work for a Design-Build Project may be considered an “officer” of the City and thus may have an organizational conflict-ofinterest with respect to subsequent contracts for the same project. (Government Code section 1090) A Contractor may be considered a City officer if they engage in or advise on the making of the subsequent contract. For example, a Contractor may be considered a City officer if they prepare or assist the City with a portion of the City’s request for proposals, request for qualifications, or other solicitation regarding a subsequent contract with the City.

A Contractor that participated in the making of a subsequent contract is prohibited from submitting a proposal for a project that pertains to that subsequent contract, either individually, or by joining a project team, unless the Contractor’s participation falls within one of the exceptions defined in Government Code section 1097.6. That section provides in part as follows, and the entire section is incorporated into this document by reference:
(a) (1) For a public entity that has entered into a contract with an independent contractor to perform one phase of a project and seeks to enter into a subsequent contract with that independent contractor for a later phase of the same project, the independent contractor is not an “officer” under this article if the independent contractor’s duties and services related to the initial contract did not include engaging in or advising on public contracting on behalf of the public entity. (2) For purposes of this section, “engaging in or advising on public contracting” means preparing or assisting the public entity with any portion of the public entity’s preparation of a request for proposals, request for qualifications, or any other solicitation regarding a subsequent or additional contract with the public entity.
(b) (1) If an independent contractor is an officer under subdivision (a), then it is not a violation of this article for the public entity to enter into a subsequent contract with that independent contractor for a later phase of the same project if the independent contractor did not engage in or advise on the making of the subsequent contract during its performance of the initial contract. (2) For purposes of this section, an independent contractor does not “engage in or advise on the making of the subsequent contract” by participating in the planning, discussions, or drawing of plans or specifications during an initial stage of a project if that participation is limited to conceptual, preliminary, or initial plans or specifications and all bidders or proposers for the subsequent contract have access to the same information, including all conceptual, preliminary, or initial plans or specifications.

A Contractor that has been awarded a contract, prior to entering a contract with other agents or subcontractors, shall ensure that its agents and subcontractors do not have a conflict-of-interest pursuant to Government Code section 1090 or this Conflict of Interest Policy.

Page 76 of 256 ends

2 If a conflict-of-interest is discovered after a contract award, the Contractor must make an immediate and full written disclosure to the City. Resolution of any conflict or potential conflict will be at the sole discretion of the City. Every contract or subcontract made in violation of Government Code section 1090 or this Conflict of Interest Policy may be voided. (Government Code section 1092) If the contract is voided, terminated, amended, or cancelled, the City assumes no obligation, responsibility, or liability to reimburse all, or part of the costs incurred or alleged to have been incurred by the Contractor. Additionally, the City shall be entitled to recover any and all payments made to the Contractor subsequent to the date when the Contractor became aware of or should have become aware of the existence of the conflict-of-interest.

INCORPORATION BY REFERENCE
This Conflict of Interest Policy shall be incorporated by reference into and included as part of all City of Gilroy Design-Build project requests for qualifications and requests for proposals, and all City of Gilroy Design-Build contracts.

Page 77 of 256 ends

3 ATTACHMENT 2 -

SAMPLE AGREEMENT FOR SERVICES
This sample agreement is current as of the date of this RFQ/P but is subject to change at the City’s discretion.

DESIGN-BUILD AGREEMENT
FOR

CITY OF GILROY

SANTA TERESA FIRE STATION

CONSTRUCTION PROJECT
PROJECT No. 26-RFQ/P-PW-536

DESIGN-BUILD AGREEMENT
This Design-Build Agreement ("Agreement") is made this day of ________, 2026 ("Agreement Date") by and between the CITY OF GILROY ("City"), having a principal place of business at 7351 Rosanna Street, Gilroy, California and a [type of entity] ("Design-Build Entity" or “DBE”) ____________________, having a principal place of business at ___________________________________________________. for the design, management, and construction of Santa Teresa Fire Station located at 1330 W Luchessa Ave, Gilroy, CA 95020 ("Project").

ARTICLE 1

TERM OF AGREEMENT
This Agreement will become effective on and will continue in effect through unless terminated in accordance with the provisions of Article 7 of this Agreement.

Page 78 of 256 ends

ARTICLE 2

INDEPENDENT CONTRACTOR STATUS
It is the express intention of the parties that the Design-Build Entity (DBE) is not an employee, agent, joint venturer or partner of CITY. Nothing in this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between CITY and DBE or any employee or agent of DBE. Both parties acknowledge that DBE is not an employee for state or federal tax purposes. DBE shall not be entitled to any of the rights or benefits afforded to CITY’S employees, including, without limitation, disability or unemployment insurance, workers’ compensation, medical insurance, sick leave, retirement benefits or any other employment benefits. DBE shall retain the right to perform services for others during the term of this Agreement.

ARTICLE 3

CONTRACT DOCUMENTS AND INTERPRETATION

3.1 DEFINITIONS
The meanings of all capitalized terms used in the Contract Documents and not otherwise defined herein are contained in the General Conditions. If not defined in the General Conditions, they shall have the meanings assigned to them elsewhere in the Contract Documents. If not defined in the General Conditions or elsewhere, they shall have the meanings reasonably understood to apply to them by the context of the portion of the Contract Documents where such terms are used.

3.2 CONTRACT DOCUMENTS
The "Contract Documents" except for modifications issued after execution of this Agreement, consist of the following documents, all of which are either attached hereto as exhibits or are incorporated herein by this reference:

3.2.1 This Agreement, including all Exhibits and attachments:

3.2.1.1 Exhibit A – Site Legal Description

3.2.1.2 Exhibit B – Scope of Work and Index of Criteria Documents

3.2.1.3 Exhibit C – Performance Bond

3.2.1.4 Exhibit D – Payment Bond (Labor and Material)

3.2.1.5 Exhibit E – DBE's Project Representation and Key Personnel

3.2.1.6 Exhibit F – Milestone Schedule

3.2.1.7 Exhibit F – Submittal Schedule

3.2.2 RFP Documents, DBE Proposal, Best and Final Offer. The RFP Documents, the DBE Proposal (if no Best and Final Offers have been submitted) or (if Best and Final Offers have been submitted) the DBE's last submitted Best and Final Offer (including, in the case of a Best and Final Offer that is an amendment to a DBE Proposal, any portion of the DBE's Proposal expressly stated to be a part of the DBE's Best and Final Offer); provided, however, that, with the exception of Approved Deviations, the Contract Documents shall not include any portion of the DBE Proposal or a Best and Final Offer that deviates from the Project criteria.

Page 79 of 256 ends

3.2.3 General Conditions
TBD

3.2.4 Supplemental and Special Conditions. The following Supplemental and Special Conditions:

Document Title Pages
TBD

3.2.5 Final Construction Documents. The Final Construction Drawings to be hereafter prepared by the DBE that are approved by the City in accordance with the terms of the Contract Documents; provided, however, that, in the exception of Approved Deviations, the Contract Documents shall not include any portion of the DBE Proposal or a Best and Final Offer that deviates from the Project criteria.

3.2.6 Addenda. The following Addenda listed below:

TBD

3.3 REFERENCE DOCUMENTS
The following Reference Documents are not considered Contract Documents and were provided to the DBE for informational purposes. DBE may rely upon the technical data contained in such documents but not upon non-technical data, interpretations, opinions or provisional statements contained therein:

3.3.1 [to be inserted after award]

3.4 ENTIRE AGREEMENT
The Contract Documents represent the entire and integrated agreement between City and DBE, all other representations or statements, whether verbal or written, are merged herein. The DesignBuild Agreement may be amended only by written modification.

ARTICLE 4

THE WORK

4.1 SCOPE OF WORK
DBE shall provide, furnish, and perform all necessary planning, architectural, engineering, and all other design services of any type, procurement, permitting and support services, construction, landscaping, clean-up, and all other construction services of any type, provide and furnish all necessary supplies, materials and equipment (except those to be provided by City, if any) and all necessary supervision, labor, and services required for the complete engineering, design, procurement, quality assurance, construction and all necessary installation, start-up and testing required for a complete, operational, and fully functional Project, as further described in DBE's Best and Final Proposal (hereinafter, the all-inclusive obligations of the DBE set forth in this sentence shall be referred to as the "Work"). Except with regard to any material to be provided and/or installed by City, DBE shall fully commission and turn over a complete operational, and

Page 80 of 256 ends

fully functional Project to City. Without limiting the generality of this Section, DBE shall provide the following work and services:

4.1.1 DBE shall prepare complete designs, engineering, working drawings, shop drawings and generate drawings and/or engineering analysis setting forth in detail the specifications and requirements for the purchasing and procurement of the services, materials and equipment and for the construction of the complete, operational, and fully functional Project, and shall furnish the services of all necessary supervisors, engineers, designers, draftsmen, and other personnel necessary for preparation of those drawings and specifications required for the Work, including the pertinent information for electrical services, water, sewer connections and any other utilities, as required.

4.1.2 DBE shall provide, install and complete as specified and pay for all labor, materials and equipment, tools, supplies, construction equipment and machinery, construction, start-up and testing, utilities, transportation, and other facilities and services (including any temporary materials, equipment, supplies and facilities) necessary for the proper execution and completion of the complete, operational, and fully functional Project, including the permanent interconnection for electricity, natural gas, water supply, and any other utilities and demonstration of fully satisfactory operation of all systems and equipment.

4.1.3 DBE shall supervise and direct the Work, and shall furnish the services of all supervisors, forepersons, skilled and unskilled labor, and all other personnel necessary to design and construct the complete, operational, and fully functional Project. DBE shall provide, manage and organize such personnel as necessary to complete the Work in accordance with all requirements of the Contract Documents.

4.1.4 DBE shall obtain, at DBE expense any required City Business License. The DBE is required to submit for and receive building and related permits. Building plan check and permit fees and applicable connection, capacity and impact fees will be paid for by the City. DBE shall design and construct complete, operational, and fully functional Project in full compliance with all applicable laws, codes and standards (both public and private), including but not limited to, the standards included and warranties expressed in the Contract Documents and manufacturer's recommendations pertaining to individual items of equipment or systems.

4.2 STANDARD OF PERFORMANCE
In addition to and without limiting DBE’s other obligations under the Contract Documents, DBE shall at all times in its performance of its obligations under the Contract Documents conform to the following general standards of performance:

4.2.1 Comply with the requirements of the Contract Documents;

4.2.2 Comply with Applicable Laws;

4.2.3 Conform to the standard of care applicable to those who provide design-build project services and construction of the type called for by this Design-Build Contract for projects of a scope and complexity that is comparable to the Project;

4.2.4 Furnish efficient business administration of the Work, utilizing sufficient senior level management and other qualified personnel to manage the Work; and

4.2.5 Apply its best and highest skill and attention to completing the Work in an

Page 81 of 256 ends

expeditious and economical manner, consistent with the expressed best interests of the City and within the limitations of the Contract Sum and Contract Time.

ARTICLE 5

TIME FOR PERFORMANCE

5.1 CONTRACT TIME
The Date of Commencement of the Work shall be fixed in a Notice to Proceed issued by the City.

If City's issuance of a Notice to Proceed is delayed due to DBE's failure to return a fully-executed Agreement, insurance documents or bonds within fourteen (14) calendar days after the date of award of the Contract, one (1) calendar day will be deducted from the number of days to achieve Substantial Completion of the Work for every day of delay in City’s receipt of such documents.

This right is in addition to and does not affect City’s right to demand forfeiture of DBE's bid Security, or any other rights or remedies available to City if DBE persistently delays in providing the required documentation. DBE agrees to promptly commence the Work after the Notice to Proceed is issued by the City, to achieve Substantial Completion of the entire Work within ____calendar days after the Date of Commencement ("Agreement Time") and to achieve Final Completion of the Work within the time fixed by the City in the Certificate of Substantial Completion. The Agreement Time may be extended only with the written authorization of the City.

5.2 LIQUIDATED DAMAGES

5.2.1 City and DBE recognize that time is of the essence if this Agreement and that the City may suffer financial loss in the form of lost grant funds, additional contract administration expenses, loss of public use if the Work is not completed within the Contract Time, including any extensions thereof allowed in accordance with the Contract Documents.

5.2.2 DBE and City agree to liquidate damages with respect to DBE's failure to achieve Substantial Completion of the Work within the Contract Time. The Parties intend for the liquidated damages set forth herein to apply to this Contract as set forth in Government Code Section 53069.85. DBE acknowledges and agrees that the liquidated damages are intended to compensateCity solely for DBE'sfailure tomeet the deadline for Substantial Completion and shall not excuse DBE from liability from any other breach, including any failure of the Work to conform to the requirements of the Contract Documents.

5.2.3 In the event that DBE fails to achieve Substantial Completion of the Work within the Contract Time, DBE agrees to pay City $10,000 per day for each calendar day that Substantial Completion is delayed.

5.2.4 DBE acknowledges and agrees that the foregoing
liquidated damages have been set based on an evaluation by City of damages that it will incur in the event of the late completion of the Work. DBE and City agree that because of the nature of the Project it would be impractical or extremely difficult to fix the amount of actual damages incurred by the City due to a delay in completion of the Work. Accordingly, the City and DBE have agreed to such liquidated damages to fix DBE’s costs and to avoid later disputes. It is understood and agreed by DBE that any liquidated damages

Page 82 of 256 ends

payable pursuant to this Agreement are not a penalty and that such amounts are not manifestly unreasonable under the circumstances existing as of the effective date of this Agreement.

5.2.5 It is further mutually agreed that City shall have the right to deduct liquidated damages against progress payments or retainage and that the City will issue a unilateral Construction Change Directive and reduce the Contract Sum accordingly. In the event the remaining unpaid Contract Sum is insufficient to cover the full amount of liquidated damages, DBE shall pay the difference to City.

ARTICLE 6

CONTRACT
SUM

6.1 CONTRACT SUM

6.1.1 Total Compensation. City shall pay the DBE in current funds for the DBE’s complete performance of the Work in accordance with the Contract Documents the Contract Sum of [ insert amount ] Dollars ($ ).

6.1.2 Design Fee. The Contract Sum includes a Design Fee of [ insert amount ] Dollars ($ ). The sole purpose of the Design Fee is to determine: (1) the compensation City is obligated to pay to DBE under Article 13 of the General Conditions in the event the DBE is terminated, by either the City or DBE, for cause or convenience, prior to commencement of any physical construction at the Site; and (2) the amount that the DBE is entitled pursuant to Paragraph 9.3 of the General Conditions to include in its Applications for Payment seeking progress payments for the design and non-design portions of the Work.

6.1.3 All Inclusive Price. The Contract Sum is the total amount payable by City to DBE for performance of the Work under the Contract Documents and is deemed to cover all costs arising out of or related to the performance of the Work, including, without limitation, the effects of natural elements upon the Work, unforeseen difficulties or obstructions affecting the performance of the Work (including, without limitation, unforeseen conditions at the Site that do not constitute Differing Site Conditions and fluctuations in market conditions and price escalations (whether occurring locally, nationally or internationally) from any cause, including, without limitation, causes beyond the control or foreseeability of the DBE.

6.2 ALTERNATES
TheContract Sum is based upon the following Alternates described in theRFQ/P Documents, which are hereby accepted by the City:

Number Description Dollar Amount
To be added later

6.3 UNIT PRICES

Page 83 of 256 ends

The following unit prices are agreed to by the DBE and City:

Description Measurement Unit Dollar Amount
To be added later

6.4 PAYMENT BY ELECTRONIC FUND TRANSFER
DBE shall accept all paymentsfrom City via electronic fundstransfer (EFT) directly deposited into the DBE’s designated checking or other bank account. DBE shall promptly comply with directions and accurately complete forms provided by City required to process EFT payments.

ARTICLE 7
DBE’S DUTIES AND RESPONSIBILITIES

7.1 GENERAL SCOPE OF WORK

7.1.1 DBE shall furnish all design and other Services, provide all materials and undertake all efforts necessary or appropriate to construct the Project in accordance with the requirements of the Agreement Documents, all governmental approvals, the approved Construction Documents, all Applicable Law, and all other applicable safety, environmental and other requirements taking into account the constraints affecting the Project Site. Except as otherwise specifically provided in this Contract, all materials, services and efforts necessary to achieve Substantial Completion of the Project and elements thereof on or before the deadlines provided in the Contract Documents shall be DBE’s sole responsibility. The costs of all such materials, services and efforts are included in the Contract Sum.

7.1.1 The scope of Services to be provided by DBE is set forth in the Contract Documents as more particularly described in Exhibit B and the Criteria Documents.

7.1.2 The DBE and all Subcontractors, shall obtain a Business License from the City prior to commencement of Work.

7.2 BEFORE STARTING WORK
DBE shall submit the following to City for review and acceptance within fourteen (14) calendar days after the Date of Commencement fixed in City's Notice to Proceed, and as a condition to payment: (i) detailed Project Schedule including each deadline specified in the Contract Documents; (ii) Schedule of Submittals; (iii) material Procurement Schedule; and (iv) a Schedule of Values in accordance with the requirements of the General Conditions and other Contract Documents.

7.3 INITIAL CONFERENCE
Within twenty (20) calendar days after the Date of Commencement fixed in City's Notice to Proceed, a conference attended by City and DBE and others as appropriate will be held to establish a working understanding among the Parties as to the Work and to discuss the design concepts, updating schedules, progress meetings, procedures for handling submittals, processing Application for Payment, maintaining required records, coordination with DBE Team Members, and other Project administration matters.

7.4 EVALUATION OF PRELIMINARY SUBMITTALS

Page 84 of 256 ends

At least ten (10) calendar days before submission of the first Application for Payment, a conference attended by DBE, City and others as appropriate, will be held to review for acceptability the submittals required by the Contract Documents. No progress payment shall be made to DBE until the required submittals are acceptable to City. The detailed Project Schedule will be acceptable to City providing an orderly progression of the Work to completion within any specified Milestones and the Contract Time, but such acceptance will neither impose on City responsibility for the sequencing, scheduling or progress of the Work nor interfere with nor relieve DBE from DBE’s full responsibility, therefore. The format and structure of the Project Schedule will be set forth in the Contract Documents and approved by City. City's acceptance shall not be deemed to confirm that the schedule is a reasonable plan for performing the Work. DBE's schedule of submittal will be acceptable to City as providing a workable arrangement for reviewing and processing the required submittals.

7.5 DESIGN PROFESSIONAL LICENSING REQUIREMENTS
City does not intend to contract for, pay for, or receive any design services which are in violation of any professional licensing laws, and by execution of this Contract, DBE acknowledges that City has no such intent. It is the intent of the Parties that DBE is fully responsible for furnishing the design of the Project, although the fully licensed design firms designated as members of the Design Team, will perform the design services required by the Contract Documents. Nothing in this Article shall create a contractual relationship between such Persons and the City.

7.6 STANDARD OF CARE
All design Services performed by DBE, the Design Team Members, Subcontractors, and their employees identified by the DBE or other persons approved by the City shall be performed in an expeditious and professional manner using architects, engineers and other professionals properly licensed and duly qualified in the jurisdiction in which the Project is located. The professional obligations of such persons shall be undertaken and performed in the interest of the DBE. All design Services performed pursuant to this Agreement shall be performed with the degree skill and learning ordinarily possessed by architects and engineers in good standing in the community regularly engaged in the design and construction of an improvement such as this Project and must apply that knowledge with the diligence ordinarily exercised by reputable architects and engineers under similar circumstances ("Standard of Care").

7.7 CONSTRUCTABILITY AND COORDINATION REVIEWS
On at least a monthly basis or such other intervals identified in the Contract Documents, DBE shall meet with the CIty, its Separate Contractors, and consultants to coordinate the Construction Documents, including the design of building systems delegated to the DBE, for the purpose of continuing construction feasibility, identifying conflicts, missing information or gaps in the planned scope of Work and to take appropriate action to ensure the full scope of intended Work is performed efficiently and economically.

7.8 DESIGN DEVELOPMENT DOCUMENTS – PHASE 1
After City’s issuance of the Notice to Proceed and within the times set forth in the Project Schedule accepted by City, DBE shall:

7.8.1 Consult with City to fully understand City's requirements for the Project and review available data;

Page 85 of 256 ends

7.8.2 Advise City as to the necessity of City's providing or obtaining from others additional reports, data or services and assist City in obtaining such reports, data, or services;

7.8.3 Identify and analyze requirements of governmental authorities having jurisdiction to approve the portions of the Project designed or specified by DBE with whom consultation is to be undertaken in connection with the Project; and

7.8.4 Review Criteria Documents provided by City.

7.8.5 Prepare plot plans, landscape, irrigation, civil, architectural, structural, mechanical and electrical floor, elevations, cross-sections and other required drawings; and outline specifications describing the size, character, and quality of the entire Project in its essentials as to kinds and locations of materials, and type of structural, mechanical and electrical systems.

7.8.6 Furnish the above documents, drawings, calculations and specifications to and review them with City for approval within the time indicated in the approved Project Schedule at increments of at least 50% and 100% completion of the Design Development Documents.

7.9 CONSTRUCTION DOCUMENTS – PHASE 2
After written acceptance by City of the Design Development Documents, DBEshall:

7.9.1 On the basis of the accepted Design Development Documents, prepare final Construction Documents showing the scope, extent, and character of the construction to be performed and furnished by DBE including technical drawings, schedules, diagrams, calculations, and specifications (which, unless otherwise approved by City, will be prepared, where appropriate, in general conformance with the Construction Specifications Institute) setting forth the requirements for construction of the Work which shall provide information customarily necessary for the use of those in building trades.

7.9.2 Provide technical criteria, written descriptions and design data required for obtaining approvals of such governmental authorities as have jurisdiction to review or approve the final design of the Project and assist City in consultations with appropriate authorities.

7.9.3 Furnish the above documents, drawings, calculations and specifications to and review them with City for approval within the time indicated in the approved Project Schedule at increments of at least 50% and 100% completion of the Construction Documents. After City’s approval of the final Construction Documents, said documents shall be deemed to be incorporated as Contract Documents. DBE shall not proceed with the construction phase unless and until it receives City's written approval of the Construction Documents or portions thereof.

7.9.4 DBE shall submit to City Construction Documents setting forth in detail drawings and specifications describing the requirements for construction of the Work. The Construction Documents shall be consistent with the latest set of interim design submissions, as such submissions may have been modified in a design review meeting. The parties shall have a design review meeting to discuss, and City shall review and approve, the Construction Documents in accordance with the proceduressetforth herein. DBE shall proceed with construction in accordance with the approved Contract Documents and shall submit one set of approved Construction Documents by City prior to commencement of construction.

The DBE shall prepare Construction Documents for the entire Project in full compliance with all applicable building codes, ordinances, and other regulatory authorities including any local adopted

Page 86 of 256 ends

amendments. The Construction Documents shall at a minimum comply with all applicable California State Building Codes to include, but not limited to, Title 8 (Industrial Relations) Title 17 (Public Health), and Title 24 (Building Standards). The completed Construction Documents are to be delivered to the City and shall consist of the following: (1) Drawings — Furnish complete construction drawings, structural calculations, and project specifications in electronic format suitable for download by prospective bidders. All documents shall have undergone prior plan review to the extent necessary to obtain permit approval from the City of Gilroy Building and Safety Division and shall enable responsible party to obtain all required permits. Electronic delivery shall be via secure cloud file share or secure FTP (SFTP). Printed sets shall be provided only upon the City’s written request. (2) Specifications — Responsible party shall deliver final, approved specifications in editable Microsoft Word format (most recent Windows-compatible version) and as searchable PDF/A files. Specification sections shall be organized to conform to the current CSI Master Format. Where manufacturer brand names are identified, the Contractor shall list a minimum of two acceptable manufacturers followed by the phrase “or equal” to preserve competitive bidding in accordance with applicable public contracting laws and regulations. All submissions shall include a digital index and embedded metadata for each file.

7.9.5 City's review and approval of interim design submissions and the Agreement Documents is for the purpose of mutually establishing a conformed set of Agreement Documents compatible with the requirements of the Work. Neither City's review nor approval of any interim design submissions and Construction Documents shall be deemed to transfer any design liability from DBE to City.

7.10 CONSTRUCTION – PHASE 3
DBE shall perform Construction Phase Series in accordance with the requirements of the General Conditions.

7.10.1 Construction Services shall be performed by DBE and/or by qualified and licensed DBE, Subcontractors and suppliers who are selected, paid and acting in the interest of the DBE in accordance with the procedures outlined in the Contract Documents.

7.10.2 The DBE shall keep the City informed of the progress and quality of the Work in the form of periodic written reports, as determined by the City but no less than monthly.

7.10.3 As a condition to final payment to DBE, each Design Team Member shall provide written certification that the Work has been constructed in accordance with the Contract Documents and the design provided by such person.

7.10.4 DBE acknowledges that release of any portion of the retention withheld by City will not occur until, at a minimum, thirty-five (35) days following the City’s filing of the Notice of Completion. Release of any retention is subject to the requirements in the General Conditions, including, but not limited to General Conditions Section, Substantial Completion, and Final Completion.

7.11 EMPLOYMENT REGULATION AND SUPERVISION REQUIREMENTS

7.11.1 DBE shall comply with California Labor Code section 1725.6. The requirements include, but are not limited to, the following:

7.11.1.1 No contractor or subcontractor may be listed on a bid proposal (submitted on or after March 1, 2015) for a public works project unless registered with the

Page 87 of 256 ends

Department of Industrial Relations (DIR) pursuant to Labor Code Section 1725.5, with limited exceptions from this requirement for bid purposes only as allowed under Labor Code Section 1771.1(a)..

7.11.1.2 No contractor or subcontractor may be awarded a contract for public work or perform work on a public works project (awarded on or after April 1, 2015) unless registered with the DIR pursuant to Labor Code Section 1725.5.

7.11.1.3 This Project is subject to compliance monitoring and enforcement by the DIR.

7.11.1.4 As required by the DIR, DBE is required to post job site notices, as prescribed by regulation, regarding compliance monitoring and enforcement by the DIR.

7.11.1.5 DBE and all of its subcontractors at every tier must submit certified payroll records online to the Labor Commissioner for all new public works projects issued on or after April 1, 2015, and for all public works projects, new or ongoing, on or after January 1, 2016.

7.11.1.5.1 The certified payroll must be submitted in a format prescribed by the Labor Commissioner at least monthly to the Labor Commissioner.

7.11.1.5.2 The City reserves the right to require DBE and all subcontractors at every tier to submit certified payroll records more frequently than monthly to the Labor Commissioner.

7.11.1.6 Registration with the DIR and the submission of certified payroll records to the Labor Commissioner are not required if the public works project is $25,000 or less when the project is for construction, alteration, demolition, installation or repair work, or if the public works project is $15,000 or less when the project is for maintenance work.

7.11.1.7 Labor Code Section 1771.1(a) states the following: “A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.”

7.12 INSURANCE
DBE agrees to provide the City with Certificates of Insurance evidencing the required insurance coverage at the time DBE executes the Agreement with the City.

7.13 SKILLED AND TRAINED WORKFORCE
The DBE shall comply with all of the requirements of Public Contract Code Section 22164(c). As required by this section DBE agrees that it “and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades.” DBE agrees that it and all of its subcontractors at every tier will comply with the requirements of Public Contract Code Section 22164(c) and will provide the City with written evidence that DBE and all of its subcontractors at

Page 88 of 256 ends

every tier are complying with these requirements by the 10th day of each month that Work is performed.

ARTICLE 8

DBE'S REPRESENTATIONS AND WARRANTIES
In order to induce City to enter into this Agreement, DBE makes the following representations and warranties:

8.1 DBE has visited the Site and has reasonably examined the nature and extent of the Work, Site, locality, actual conditions, as-built conditions, and all local and federal, state and local laws and regulations that in any manner may affect cost, progress, performance or furnishing of Work or which relate to any aspect of the design and the means, methods, techniques, sequences or procedures of construction to be employed by DBE and safety precautions and programs incident thereto.

8.2 DBE has reasonably examined all reports of exploration and tests of subsurface conditions, as-built drawings, drawings or reports, available for design and construction purposes, of physical conditions, including those which are identified in Paragraph 1.3 hereinabove, or which may be apparent at the Site and accepts the criteria set forth in these documents and the General Conditions to the extent of the information contained in these documents upon which the DBE is entitled to rely. DBE agrees that except for the information so identified, DBE does not and shall not rely on any other information contained in these documents.

8.3 After contract award, DBE, will conduct or obtain any additional examinations, investigations, explorations, tests, reports and studies, including but not limited to geotechnical investigations upon which the design will be based, that pertain to the surface and subsurface conditions, as-built conditions, underground facilities and all other physical conditions at or contiguous to the Site as DBE considers necessary for the performance or furnishing of Work at the Contract Sum, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents.

8.4 DBE has correlated its knowledge and the results of all such observations, examinations, investigations, explorations, test, reports and studies with the terms and conditions of the Contract Documents.

8.5 DBE has given City prompt written notice of all conflicts, errors, ambiguities, or discrepancies that it has discovered before contract award in or among the Contract Documents and as-built drawings and actual conditions and the written resolution thereof through Addenda issued by City is acceptable to DBE.

8.6 DBE is duly organized, existing and in good standing under applicable State law, and is duly qualified to conduct business in the State of California.

8.7 DBE has duly authorized the execution, delivery and performance of this Agreement, the other Contract Documents and the Work to be performed herein. The Agreement Documents do not violate or create a default under any instrument, agreement, order or decree binding on DBE.

8.8 DBE confirms its intent to include in the project the following pre-qualified subcontractors, who were listed in the DBEs Statement of Qualifications earlier in this design-build procurement process. DBE acknowledges its responsibility to provide City with a complete and updated list of

Page 89 of 256 ends

subcontractors as they become known on the project, and that such listing shall be in accordance with the requirements of California Public Contract Code Section 22166. As required by Public Contract Code Section 22166(b), following the City’s approval of the Agreement, the DBE shall award construction subcontracts with a value exceeding ½ of 1% of the Contract Sum allocable to construction Work as follows: (1) Provide public notice of the availability of work to be subcontracted in accordance with the publication requirements applicable to the competitive bidding process used by the City, including a fixed date and time when qualification statements, bids or proposals will be due; (2) Establish reasonable qualification criteria and standards; and (3) Award the subcontract either on a best value basis or to the lowest responsible bidder – this process may include prequalification or short-listing and does not apply to construction subcontractors listed in the DBE’s Proposal. All construction subcontractors that were identified in the Proposal and awarded as required under Public Contract Code Section 22166 shall be afforded all the protections of Public Contract Code Section 4100 et seq.

NAME OF

SUBCONTRACTOR

AND LOCATION OF

MILL OR SHOP

DESCRIPTION OF
WORK: REFERENCE

TO BID ITEMS

SUBCONTRACTOR'S

LICENSE
NO.

ARTICLE 9

MISCELLANEOUS PROVISIONS

9.1 INDEPENDENT DBE
DBE is and shall be acting at all times in the performance of this Agreement as an independent DBE. DBE shall secure at its expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for DBE and its officers, agents and employees and all business licenses, if any, in connection with the services to be performed hereunder.

9.2 CITY EMPLOYEES AND OFFICIALS
DBE shall employ no City official nor any regular City employee in the Work performed pursuant to this Agreement. No officer or employee of City shall have any financial interest in this Agreement in violation of applicable provisions of law.

Page 90 of 256 ends

DBE agrees to provide or has already provided information on former City of Gilroy administrative officials (as defined below) who are employed by or represent DBE. The information provided includes a list of former City administrative officials who terminated City employment within the last five years and who are now officers, principals, partners, associates or members of the business. The information also includes the employment with or representation of DBE. For purposes of this provision, "City Administrative Official" is defined as a member of the City Council, City Administrator or member of such officer’s staff, City department head, assistant/deputy department head, or any employee in the Management, Fire or Police negotiating group.

9.3 IRAN CONTRACTING ACT OF 2010
(Public Contract Code sections 2200 et seq.)
(Applicable for all Contracts of one million dollars ($1,000,000) or more) In accordance with Public Contract Code section 2204(a), the DBE certifies that at the time the Contract is signed, the DBE signing the contract is not identified on a list created pursuant to subdivision (b) of Public Contract Code section 2203
(http://www.dgs.ca.gov/pd/Resources/PDLegislation.aspx) as a person (as defined in Public Contract Code section 2202(e)) engaging in investment activities in Iran described in subdivision (a) of Public Contract Code section 2202.5, or as a person described in subdivision (b) of Public Contract Code section 2202.5, as applicable.

Contractors are cautioned that making a false certification may subject the contractor to civil penalties, termination of existing contract, and ineligibility to bid on a contract for a period of three (3) years in accordance with Public Contract Code section 2205. DBE agrees that signing the Contract shall constitute signature of this Certification.

9.4 DEBARMENT AND SUSPENSION
The DBE certifies that neither it nor its principals, or other key decision makers, or subcontractors is presently disbarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency or on the Federal Government Excluded Parties List System (www.epls.gov). DBE agrees that signing this Contract shall constitute signature of this Certification.

9.5 INACCURACIES OR MISREPRESENTATIONS
If during the course of the administration of this agreement, the City determines that the DBE has made a material misstatement or misrepresentation or that materially inaccurate information has been provided to the City, this Agreement may be immediately terminated. If this Agreement is terminated according to this provision, the City is entitled to purse any available legal remedies.

9.6 NOTICES
Any notices or special instruction required to be given in writing under this Agreement shall be given either by personal delivery to DBE’s agent (as designated in Section 1 hereinabove) or to the City Administrator and Public Works Director as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal

Page 91 of 256 ends

Service, addressed as follows:

CITY DBE

9.7 CONTRACTOR'S LICENSE NOTICE
Contractors are required by law to be licensed and regulated by the Contractors State Licensee Board, which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within 10 years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors State License Board, P.O. Box 26000, Sacramento, California 95826.

WHEREFORE, this Design-Builder Agreement is entered into as of the day and year first written above.

Executed at Gilroy, California, on the date and year first above written.

DBE: CITY:
__________________________________________ CITY OF GILROY By: ________________________________ By:_______________________________ Name: _____________________________ Name:_____________________________ Title: ______________________________ Title:______________________________

Page 92 of 256 ends

20421.1 | 5329-184400 Exhibit A - 1

EXHIBIT A

SITE LEGAL DESCRIPTION
Site Address: 1330 W Luchessa Ave, Gilroy, CA 95020
APN: 80858004
Parcel Lot Number: Q

Page 93 of 256 ends

19 EXHIBIT B

SCOPE OF WORK AND INDEX OF

CRITERIA DOCUMENTS
Project Overview
The Santa Teresa Fire Station Project is a new approximately 6,700 SF Fire Station on approximately one (1) Acre to be delivered using the Design Build project delivery method. The project will be located at 1330 W Luchessa Avenue, at the southeast corner of West Luchessa Avenue and Miller Avenue, in the City of Gilroy and is intended to strengthen the City’s emergency response capabilities while supporting long term operational flexibility and community growth.

The selected Design Build Entity (DBE) will be provided with 100% schematic design level bridging documents and associated performance criteria by major building systems. The DBE will be responsible for advancing the project through design development, construction documents, permitting, and construction, while verifying all site conditions, coordinating with applicable authorities having jurisdiction, and delivering a fully integrated and code compliant facility.

The Santa Teresa Fire Station is envisioned as a modern, efficient, and resilient facility that supports fire suppression, emergency response, and day-to-day operations. The design is expected to prioritize operational efficiency, staff safety and wellness, durable materials, and adaptability for future needs. Site development will include apparatus access and circulation, secure and unsecured parking, outdoor operational and training areas, and appropriate landscape and hardscape improvements consistent with the surrounding context.

In addition, a future approximately 0.28-acre area has been identified for potential future fire station use. As part of the initial site improvements, this area shall be protected and secured, with site planning designed to allow for efficient adaptability and seamless integration into future station operations as service needs evolve.

PHASE 1: PRECONSTRUCTION SERVICES
Design Advancement, Cost Management, and Schedule Coordination Preconstruction services shall commence upon issuance of the Preconstruction Phase Notice to Proceed. The DBE shall not perform any services prior to issuance of the NTP. The intent of this phase is to advance the design from the City’s 100% schematic design bridging documents through permitted construction documents, while maintaining cost control, schedule discipline, and alignment with the established lumpsum Guaranteed Maximum Price.

General Preconstruction Responsibilities
During the preconstruction phase, the DBE shall provide integrated design, scheduling, cost management, and coordination services necessary to efficiently advance the Project through design development and construction documents. The DBE shall work collaboratively with the City to maintain alignment with the established GMP and to support an expedited transition into construction.

Page 94 of 256 ends

20 Design Services
The Contractor shall provide complete architectural, engineering, and consulting services required to advance the Project from the City’s approved schematic design bridging documents to plan-checked and permitted construction documents.

Design services shall be continuous and coordinated to support constructability, schedule efficiency, and cost control. Minimum design deliverables shall include:
• 50% Design Development with outline specifications
• 100% Design Development with outline specifications
• 30% Construction Documents with outline specifications • 60% Construction Documents with outline specifications • 95% Construction Documents suitable for plan check and permitting The DBE shall coordinate with all authorities having jurisdiction and shall be responsible for incorporating all required comments into the construction documents.

Project Scheduling
The DBE shall prepare and maintain a comprehensive Project Schedule reflecting all remaining design, permitting, and construction activities. The City’s objective is to expedite delivery to the greatest extent feasible.

The schedule shall be updated at least monthly, or more frequently if requested by the City, and shall be structured to allow overlapping design, procurement, and construction activities where appropriate, consistent with the established GMP and Contract requirements.

Cost Tracking, Budget Validation, and Reporting
The Project GMP shall be established as part of the DBE procurement based on the City’s 100% schematic design bridging documents. The DBE shall not be required to re-establish the GMP during preconstruction.

As design advances, the DBE shall:

1. Track and report design evolution against the established GMP

2. Provide periodic cost updates aligned with design milestones

3. Identify variances, trends, or emerging risks that could affect the GMP

4. Recommend mitigation strategies or scope adjustments, if necessary, to maintain alignment with the GMP
Cost reporting shall be transparent and structured to give the City clear visibility into how design decisions impact budget while preserving the integrity of the agreed-upon GMP.

Page 95 of 256 ends

21 Presentations and Agency Coordination
The DBE shall prepare presentation materials including plans, schedules, and cost summaries to support City review and approvals. At a minimum, the DBE shall support:
• Regular project team meetings, most likely weekly
• At least two (2) presentations to the Design Review Board or Planning Commission • At least two (2) presentations to City Council
Risk Identification and Mitigation
The DBE shall identify project risks that may affect scope, quality, schedule, or cost and document such risks in a risk matrix. The DBE shall recommend mitigation strategies and incorporate risk management into design advancement, scheduling, and procurement planning.

Cost Efficiency and Constructability
The DBE shall actively pursue constructability improvements, sequencing efficiencies, and costconscious solutions that do not alter the Project program, performance criteria, or design intent.

Any proposed efficiencies shall be evaluated in the context of maintaining the established GMP, quality standards, and long-term performance.

Early and Incremental Construction Activities
Where beneficial to schedule, the DBE shall evaluate opportunities for early procurement or early construction activities consistent with the Contract and GMP. Proposed early activities shall be presented to the City for review and approval prior to implementation.

PHASE 2: CONSTRUCTION SERVICES: CONSTRUCTION, COORDINATION, and PROJECT

CLOSEOUT
Construction Phase Notice to Proceed
The City shall issue a Construction Phase Notice to Proceed upon satisfaction of the following conditions:
• Completion of plan check and issuance of required permits • Confirmation of the Project Schedule and Completion Date • Verification of conformance with the Contract Documents • Verification of required bonding and insurance
The DBE shall not commence Construction Phase services prior to issuance of the Construction Phase Notice to Proceed. The City’s intent is to issue the Construction Phase NTP promptly following permit approval in order to maintain project momentum and support an expedited delivery schedule.

Page 96 of 256 ends

22 General Construction Responsibilities
Upon issuance of the Construction Phase Notice to Proceed, the DBE shall furnish all labor, materials, equipment, supervision, and services necessary to complete construction of the Project in accordance with the Contract Documents, applicable codes, and approved permits.

The DBE shall be fully responsible for coordination of all construction activities, subcontractors, suppliers, and consultants to ensure the Project is delivered safely, efficiently, and in compliance with quality, schedule, and cost requirements.

Subcontractor Procurement and Management
The DBE shall identify subcontractors listed in its proposal using the Designation of Subcontractors List. All subcontractors not previously identified shall be procured in accordance with the California Public Contract Code through a publicly advertised and competitive process.

All subcontractors shall comply with applicable public works requirements, including prevailing wage laws. The DBE shall be responsible for managing subcontractor performance, coordination, scheduling, and compliance throughout construction.

Preconstruction Conference
The City and the DBE shall jointly conduct a preconstruction conference with subcontractors, design personnel, City representatives, the Inspector of Record, and applicable consultants.

The conference agenda shall include, at a minimum:
• Safety requirements, site logistics, and any special conditions • Communication protocols and lines of authority
• Procedures for submittals, RFIs, and clarifications
• Change management and payment procedures
• Testing, inspection, and quality control requirements • Meeting minutes shall be prepared and distributed by the DBE Testing and Inspection
Special testing and inspection services required by code shall be provided by the City. The DBE shall coordinate with the City’s testing and inspection agencies and shall provide reasonable access, scheduling coordination, and support to facilitate inspections without delay to the Project.

The DBE remains responsible for the quality and completeness of the Work regardless of testing and inspection activities.

Project Schedule Updates and Reporting
The DBE shall maintain and update the Project Schedule at least monthly, or more frequently if required by the Contract or requested by the City. Schedule updates shall clearly identify

Page 97 of 256 ends

23 progress, upcoming milestones, and any potential impacts to the Completion Date.

The DBE shall assist the City with periodic progress reporting and shall prepare presentations or written updates for City management, oversight bodies, or governing boards as requested.

Cost Control and Change Management
The DBE shall perform the Work in accordance with the established lump-sum Guaranteed Maximum Price. Changes to the GMP shall be limited to those allowed under the Contract and shall follow established change management procedures.

The DBE shall promptly notify the City of any events or conditions that may affect cost, schedule, or scope and shall collaborate with the City to evaluate and address such issues.

Substantial Completion and Project Closeout
The DBE shall achieve Substantial Completion in accordance with the Contract and shall complete all required closeout activities, including:
• Completion of punch list items
• Delivery of as-built drawings and record documents
• Submission of warranties, manuals, and certifications • Training of City personnel as required
• Final inspections and acceptance
• Final payment shall be made in accordance with the Contract following successful completion of all closeout requirements.

Project Documents
Bridging Documents. It is the intent of the City that the work be performed by the DBE as part of the Project and the Project shall be designed and constructed in accordance with the Bridging Documents (Attachment 1) which are 100 % Schematic Design level drawings with performance criteria developed by LPA Design Studios.

Reference Documents
• GEOCON Consultants Geotechnical Investigation Report
• LPA Design Studios Bridging Documents
Project Requirements

1. For purposes of fee proposal calculation, the estimated direct construction cost (hard costs only) is approximately $11,000,000. This amount excludes construction contingency, design fees, and all other soft costs.

Page 98 of 256 ends

24 2. The City will withhold retention of 5% from all payments for the work.

3. Liquidated damages will be Two Thousand Five Hundred Dollars ($2,500) for each calendar day that the Project extends beyond the Completion Date.

4. The DBE must have a State of California “B” license.

5. The architect must be licensed in the State of California.

6. The DBE must have a valid City of Gilroy Business License.

Page 99 of 256 ends

J:\33000\33236\DOCS\001 Project Information\00\Basis of Design IRVINE • SACRAMENTO • SAN DIEGO • SAN JOSE • DALLAS • SAN ANTONIO

City of Gilroy
Santa Teresa Fire Station
100% S D / BRIDGING DOCUMENTS BASIS OF DESIGN
April 03 , 202 6
City of Gilroy
Gilroy , California
Project No:

C33236
Developed by:

LPA, Inc.

Page 100 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 1

Page 1 ends

PROJECT T EAM
Owner: Construction Manager:

City of Gilroy
7351 Rosanna Street
Gilroy, CA 9 2618
P: 408.846.0277
Griffin Structures, Inc.
1 Technology Dr,
Building I, Suite 829
Irvine, CA 92618
P: 949.497.9000
Architect: Landscape Architect :

LPA, INC.
5301 California Ave.

Suite 100
Irvine, CA 92617
P: 949.260.1001
LPA, INC.
5301 California Ave.

Suite 100
Irvine, CA 92617
P: 949.260.1001
Structural Engineer: Civil Engineer :

LPA, INC.
5301 California Ave.

Suite 100
Irvine, CA 92617
P: 949.260.1001
LPA, INC.
5301 California Ave.

Suite 100
Irvine, CA 92617
P: 949.260.1001
Mechanical / Plumbing Engineer: Electrical Engineer / Lighting:

LPA, INC.
5301 California Ave.

Suite 100
Irvine, CA 92617
P: 949.260.1001
LPA, INC.
5301 California Ave.

Suite 100
Irvine, CA 92617
P: 949.260.1001
Geotechnical Engineer:

Geocon Consultants, Inc.
6671 Brisa Street
Livermore, CA 9 4550
P: 925.371.5900
Geocon Project No. E9213-04 -06

Page 101 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 2

Page 2 ends

001 SUMMARY OF WORK
A. GENERAL DESCRIPTION
The Project consists of a new 6,500 – 7,000 square foot one -story , all-electric fire station building which include s two fire truck bays, administrative offices , individual dormitory rooms , kitchen , shared living area, fitness and support spaces on an approximately 1.3 6 acre site at the southeast corner of West Luchessa Avenue and Miller Avenue in Gilroy, CA. The project address provided at this time is 1330 West Luchessa Avenue. Site improvements include secure d staff parking , public/visitor parking , an emergency generator, a roofed trash enclosure, perimeter wall, and vehicular gates. There are 2 alternates included as part of this Project ; see list on Drawing Sheet G0.20 .

B. DESIGN -BUILD NOTES

1. These bridging documents establish the basis of design for the project. Items shown, depicted, described, suggested, implied, referenced, or otherwise conveyed in any manner within these documents shall be incorporated into the Design -Build Entity’s ( DBE ) final design, engineering, and construction without additional cost to the City. The DBE shall resolve all discrepancies, omissions, schematic details, or conflicts in a manner consistent with the owner’s program, spatial, and functional intent, whether expressly shown or implied in the bridging documents. At no point shall the DBE ’s final design omit, reduce, substitute, or alter any space, furnishing, system, feature, or element depicted, described, referenced, or otherwise conveyed in the bridging documents, except with the prior written approval of the City or Constr uction Manager specific to said item, and such approval shall not constitute grounds for additional compensation or time unless expressly authorized in writing by the City. Where discrepancies exist among the bridging documents, the DBE shall assume and carry the most stringent and comprehensive interpretation of the requirement and shall not have grounds to request additional compensation or time for doing so. The DBE shall not rely upon the preliminary nature of these documents to assert claims for additional compensation or time. The DBE is solely responsible for ensuring that the final design is fully compliant with all applicable codes and requirements of authorities having jurisdiction, constructible, coordinated across all disciplines, and consistent with the owner’s program intent. Utility layouts depicted in the bridging documents are diagrammatic only. The DBE is fully responsible for finalizing the design, engineering, and coordination of all utility services directly with the provider, including submitting complete applications and securing approvals and permits from the serving utilities and authorities having jurisdiction (permit fees to be paid by the City).

2. The DBE shall ensure that all utility services are designed, coordinated, and installed in a manner that meets the project schedule and supports timely occupancy.in the event of conflicts between these documents, the interpretation most consistent with the owner’ s program intent shall govern. The DBE shall provide all design, labor, materials, equipment, supervision, and systems required to furnish and install the project consistent with these requirements. No omission or ambiguity in the bridging documents shall relieve the DBE of its obligation to deliver a complete, fully functioning, and code -compliant facility. For purposes of this disclaimer, “bridging documents” means all plans, specifications, basis of design narratives, reports, and exhibits issued by the owner as part o f the procurement package.

3. These Criteria/Bridging Documents: (a) reflect a design that is preliminary, incomplete, and conceptual in nature; (b) will undergo material development and change as the design is refined into Construction Documents by others; (c) contain unresolved desig n issues that may impact the Cost of the Work and the Project schedule; and (d) were prepared solely for the purpose of establishing the basis of design for further design development. The Design -Builder shall include appropriate contingencies and other al lowances for changes to the Cost of the Work or Project schedule resulting from evolution of the design, cost estimating, Owner changes, changes required by authorities having jurisdiction, constructability reviews, trade subcontractor input, and other

Page 102 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 3

Page 3 ends

circumstances (expected and unexpected) that may impact the cost or time required to perform the Work.

4. The contents of the RFP package are included with product references for use as the basis of the Design -Build Entity (DBE) to use as the basis for system selection and design. Alternate products and systems will be considered for the savings value, system performance and aesthetic. Proposed alternates shall be provided at the time of bid for evaluation by the owner, owner's representative and the architect.

C. AREA SUMMARY
Building Area: 6,687 SF
Covered Area + Roof Overhang: 2,252 SF
(Building Dept. Area 8,939 SF)
Site Development: ± 1.36 AC
The Main Building construction is Type V-B, fully sprinklered according to NFPA 13 D. OCCUPANCY TYPE
Nonseparated Occupancies including B, R -2 & S-2
E. PROJECT DELIVERY METHOD
Design /Build is the delivery method for th e project.

F. AHJ PROCESSING REQUIREMENTS

1. DBE is responsible for obtaining necessary permits on all aspects of the project including grading, building (city, county & HCD) , utilities, CARB, etc. for the entirety of the project.

G. ALTERNATES

1. See list of Alternates on Drawing Sheet G0.20.

END OF SUMMARY OF WORK SECTION
002 CODES AND STANDARDS
A. GENERAL DESCRIPTION
This Project will comply with 1)all the current building codes in the State of California and American Disabilities Act and 2) in accordance with the Essential Services Seismic Safety Act The project shall be designed to the current edition o f the adopted Title 24 C.C.R. codes expected to be the 2025 editions.

B. MUNICIPAL / STATE BUILDING CODES AND STANDARDS
• California Building Standards Administrative Code, Title 24 C.C.R., Part 1 • California Building Code (CBC), Title 24 C.C.R., Part 2 • California Residential Code (C RC), Title 24 C.C.R., Part 2 .5

Page 103 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 4

Page 4 ends

• California Electrical Code (CEC), Title 24 C.C.R., Part 3 • California Mechanical Code (CMC), Title 24 C.C.R., Part 4 • California Plumbing Code (CPC), Title 24 C.C.R., Part 5 • California Energy Code, Title 24 C.C.R., Part 6
• California Fire Code (CFC), Title 24 C.C.R., Part 9
• California Green Building Standards (Calgreen), Title 24 C.C.R., Part 11 • California Referenced Standards, Title 24 C.C.R., Part 12 • ADA Standards for Accessible Design
• Title 19 C.C.R., Public Safety, State Fire Marshal Regulations • Gilroy City Code, current through Ordinance 2025 -11, passed December 8, 2025 C. PARTIAL LIST OF APPLICABLE STANDARDS
• ASHRAE Standard Ventilation
• ASHRAE Standard Thermal Comfort
• NFPA 13 Automatic Sprinkler Systems (CA Amended)
• NFPA 14 Standpipe Systems (CA Amended)
• NFPA 20 Stationary Pumps
• NFPA 24 Private Fire Mains (CA Amended)
• NFPA 72 National Fire Alarm Code (CA Amended)
• NFPA 80 Fire Door and Other Opening Protectives
• NFPA 2001 Clean Agent Fire Extinguishing Systems
Reference Code Section for NFPA Standards.

See Chapter 35 for the State of California Amendments to NFPA Standards.

D. LEED
None required.

END OF CODES AND STANDARDS SECTION
003 - SITE PLANNING
A. EXISTING SITE
The project site is approximately 1.36 acres within the City of Gilroy , County of Santa Clara . It is a vacant lot with some vegetation. There is a grade difference of approximately 8 feet from the southwest corner of the site to the northeast corner. The site is surrounded by an undeveloped residential lot to the south and east, and existing street improvements to the west and north.

Cad files of the existing topography and the surrounding street improvements were provided by the City of Gilroy.

A draft geotechnical investigation report was prepared by Geocon Consultants, Inc. , Project No . E9213- 04 -06 dated January 09, 2026.

The project proposes to utilize City of Gilroy standards for onsite improvements (if applicable). Offsite improvements are not anticipated.

Page 104 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 5

Page 5 ends

B. DEMOL ITION
Clear and grub existing vacant lot and remove existing vegetation.

C. GRADING/EARTHWORK
Refer to the Draft Geotechnical Investigation Report for over-excavation, pavement sections, and utilities trenching and bedding recommendations .

Proposed grades shall support the building access, fire apparatus road, parking circulation, and drainage designs. Along ADA accessible path -of-travel, longitudinal grades shall not exceed 5%, and cross slopes shall not exceed 2%. ADA accessible ramps into the building shall meet the requirements of the 2022 Access Compliance Advisory Manual. Hardscape areas adjacent to buildings shall be sloped 2% maximum away from the building. Planting areas adjacent to buildings shall be sloped 5% minimum away from the building.

D. EXTERIOR IMPROVEMENTS

1. Parking lot will be paved in asphalt. Thickness of asphalt pavement and base material shall be per Geotechnical Engineer’s recommendation.

2. Onsite hardscape will include curb, gutter, vehicular concrete paving and pedestrian concrete paving. Pedestrian and vehicular concrete paving will be Portland Cement paving. Thickness of concrete pavement and base material shall be per Geotechnical Engine er’s recommendation.

3. Finish on concrete to be medium broom and Top Cast. Include both natural gray concrete and integral colored concrete by Davis Color. Speed dowels should be from Sika Corporation. Provide dowel connections at all exterior doors. Include mix designs. All con crete to be sealed with lithium - based sealer.

4. ADA detectable warning tiles (12” x12” precast concrete tiles from Wausau Design ) and pavement markings are to be installed. Parking lot pavement markings are to be water emulsion -based traffic paint.

5. MOTORIZED GATE OPERATOR
Provide a HySecurity SlideDriver II SD50 for the gate operator. Provide photo -eye safety beams, edge sensors in -pavement traffic loops, and other safety and security features per UL325. Gate to be custom tubular steel with expanded metal inserts and painted with a high -performance coating.

Expanded metal inserts basis of design: APEX01 Expanded Mesh by Amico Architectural Metals.

Keypad access at south entry.

6. TUBE STEEL GATES
Tubular Steel Gates: 2” x 2” x 12ga. gate frame and rails with expanded metal inserts (basis of design:

APEX01 Expanded Mesh by Amico Architectural Metals ). 6’ height, 4X4X1/4” fence and pedestrian gate posts; . Powder coat finis h. Color: Black Stone (MP33348) by Matthews Paint Company. All egress swing gates to have accessible hardware with ¼” thick plate and panic hardware.

7. EMERGENCY GENERATOR AND TRASH ENCLOSURE GATES
3” x3” x 1/4” Steel L frame with expanded metal inserts (basis of design: APEX01 Expanded Mesh by Amico Architectural Metals) for 5’ wide leafs. 2 high -capacity hinges (Brookfield i -8500 series) per leaf, Polyurethane coating system .

Page 105 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 6

Page 6 ends

8. SITE FURNISHINGS
a. Flagpoles, 30 -foot tall, internal halyard and clear anodized finial ball from American Flagpole. Flag to be 5’x8’
b. Bike racks, Landscape Forms, Ring rack, stainless steel, embedded. c. Bike Locker, Dura Bike Locker, model DL 2 locker, powder coated, U -Lock/padlock handle. Provide space for two bikes.
d. Dining Table (OFOI) – Landscape Forms Steelhead Table, powdercoat finish e. Dining Chairs (OFOI) – Landscape Forms 21 Chair

9. PEDESTRIAN LIGHTING
See Lighting BOD.

10. PLANTING PREPARATION
Scrape and stockpile upper 12” of topsoil. Amend all planting areas as recommended by Agronomic Soil Test results.

11. LANDSCAPE IRRIGATION SYSTEM
Rain Bird 1800 -SAM-PRS series spray heads with 5F -B bubblers for all trees located within shrub areas, provide two bubblers per tree. Rain Bird EFB -CP -PRS -D valves for all non - drip valve assemblies. Rotor heads shall be Hunter I -20 and Hunter I -25. Rain B ird XCZ series drip valve assemblies for all drip valves. KBI swing and spring check valves used when elevation difference exists between valves and zones, check valves shall also be used as required to prevent low head and low area drainage. Rainbird Smar t Irrigation Controller with rain shut-off device. Data Industrial flow sensor at POC with Superior Model 3100 series master control valve. Toro DL200 drip tubing within all shrub planters. 3M DBR/Y -6 wire connectors for all wire connections. Sheathed #12 detection wire to be include d along main line runs.

12. LANDSCAPE PLANTING
48” box trees and 36” box trees. 15 -gallon, 5 -gallon, and 1-gallon shrubs. Root barriers from Deep Root- UB24 -2. Duckbill anchoring system/triple stake trees. 3” layer of shredded bark mulch from Whittier Fertilizer. Bioretention soil, (Sandy Loam) 18” dee p and percolation rate of 5 in/hour minimum from TMT Enterprises .

13. LANDSCAPE PLANTERS
Basis of design: Kitsap Aluminum Modular Planter Walls by T ournesol. Finish : Powder -coat metal.

Color: Pitched Satin.

14. SITE HANDRAILS
Provided as required by code and per plan. Color: Black Stone (MP33348) by Matthews Paint Company.

15. COBBLE:
4”-6” river rock as required at bio retention planter pipe outfalls and drain inlets .

16. LANDSCAPE MAINTENANCE
90 -day maintenance period.
0 17. SUB -DRAINAGE SYSTEMS
9”-12” drains provided for all landscape areas.

Page 106 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 7

Page 7 ends

E. WET UTILITIES

1. Water Service
There will be a new water service connection to the existing waterline in Luchessa Avenue. New water meter and reduced pressure backflow preventer shall be installed. A new 3-inch domestic water line will be connected to the existing domestic water lateral in Luchessa Avenue. Service will be extended to the new plumbing POC at the proposed building and the trash enclosure area .

Domestic water pipes shall be PVC (SCH 80) for pipes sizes smaller or equal to 3” and PVC (DR -18) for 4” and up. Gate valves and thrust blocks shall be installed per City of Gilroy Water Department standards.

2. Fire Water Service
There will be a new fire water service per the City of Gilroy Fire Department for the project. A 4 -inch fire line is proposed and connected to the existing 4 -inch fire water lateral in Luchessa Avenue. One double detector check assemblies with a 2-way fire department connection (FDC ) will be installed.

One fire hydrant with 1-4” and 2 -2.5” outlets is also proposed. Fire water pipes shall be C900 PVC (DR -14).

3. Sanitary Sewer System
A new sanitary sewer service lateral will be connected to the existing 4-inch sewer lateral behind the sidewalk in Luchessa Avenue. It is assumed that this existing sewer has the capacity to receive sewer flow generated from the proposed development and is deep enough so that gravity flow can be maintained.

The roofed trash enclosure runoff will be directed to the onsite sanitary sewer system.

Wash water from the exterior vehicle washdown area will be directed to a sand/oil separator before discharging in to the onsite sanitary sewer system via a Fox Drain system .

Sanitary sewer pipes shall be PVC (SDR 35) installed with slopes equal to or greater than 1 percent minimum. Sewer cleanouts shall be installed at changes in pipe direction and at intervals of 100 feet maximum.

4. Storm Drain System
Stormwater treatment shall comply with the City of Gilroy requirements and C.3 Stormwater Handbook .

Hydromodification is anticipated because of the increase in impervious areas from the existing condition.

Since i nfiltration is feasible based on the percolation test results shown in the Geotechnical Report , bioretention basins without underdrains are proposed to allow some storage and infiltration into the native soil. Location of these basins such as setbacks from the Right -of-Way, Structure’s footing etc., has to be reviewed and approved by the Geotechnical Engineer . Other infiltration BMP s such as subsurface infiltration systems utilizing underground pipes or vaults to store and infiltrate runoff can also be an a lternative.

The proposed development will capture the majority of the storm runoff through drain inlets and catch basins. Drain inlets/catch basins will be installed at various locations in the landscaped areas.

Runoff will be treated through infiltration BMPs before discharging into the existing public storm drain system in Luchessa Avenue.

Page 107 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 8

Page 8 ends

Storm runoff from the exterior vehicle washdown area will be directed to the onsite storm drain system with a Fox Drain system.

Onsite storm drain conveyance shall be PVC SDR 35 for pipe sizes 4” to 10” and HDPE for pipe sizes 12” and up. Drain inlets shall be precast concrete or HDPE and will range from 6 -inch round to 24” square grates. Planter drains shall be 4 -inch or 6 -inch round black atrium drains. Storm drain cleanouts shall be installed at changes in pipe direction and at intervals of 100 feet maximum. Drain basins shall be installed in lieu of cleanouts for pipes larger than 12”.

F. EROSION CONTROL
BMP’s (Best Management Practices) and erosion control requirements will be stipulated on the Erosion Control Plan, to be prepared by the design consultant.

Since the limits of disturbance exceed 1 -acre, a Storm Water Pollution Prevention Plan (SWPPP) will be required, to be prepared by the design consultant.

The Design -Build Entity shall be required to employ the services of a Qualified SWPPP Practitioner (QSP). The QSP shall be required to download copies of the approved SWPPP from the State and will be responsible for implementation and enforcement of the SWPPP and the Erosion Con trol Plan during construction.

Within 90 days of construction completion, the Design -Build Entity 's QSP shall electronically file a Notice of Termination, NOT, to the State Water Board's SMARTS system.

END OF SITE PLANNING SECTION
004 STRUCTURAL SYSTEMS
A. GENERAL

1. The building must be designed to meet the requirements for an essential services building (risk category IV) as required by the 2025 CBC. While the below provides suggested structural systems, the design team is responsible for choosing a system that adequately addresses the final design with consideration of long -term serviceability and structural durability. Wood structural systems ar e not considered an acceptable alternative.

B. GRAVITY SYSTEMS

1. Foundation System
Refer to the owner-provided , draft geotechnical investigation report by Geocon Consult ants Inc., Project No . E9213-04 -06 dated January 09 , 2026. The building may be supported by shallow foundations designed to allowable pressures provided in the geotechnical report. However, the final building layout and loading should be evaluated by the geotechnical engineer to ensure the recommendations provided in the report are adequate. The ground floor slab -on-grade is expected to be a conventional reinforced 5” slab -on-grade typical and 10” thick in the apparatus bays but should be confirmed by the structural engineer.

Page 108 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 9

Page 9 ends

2. Framing System
It is anticipated that the roof framing will be constructed out of light-gauge steel and structural steel supporting metal deck. However, alternative framing systems may be chosen based on the final layout and design of the new building and should include consideration of life -cycle costs, resilience, and constructability. Wood construction is not an acceptable alternative.

C. LATERAL SYSTEMS
The primary lateral system is anticipated to be light -framed metal framing with steel sheets or Special Steel Moment Frames. However, alternative framing systems may be chosen based on the final layout and design of the new building and should include consideration of life -cycle costs, resilience, and constructability. Wood construction is not an acceptable alternative.

D. NONSTRUCTURAL COMPONENTS
Nonstructural components are to be designed and anchored per the requirements of the 2025 CBC and ASCE 7 -22 Chapter 13. All architectural, mechanical, electrical, plumbing, fire protection , audio/visual systems , etc., must be anchored per code requirements and utilizing an importance factor equal to 1.5.

E. LOAD S

LIVE LOADS
Per CBC, Section 1607.

WIND LOADS
Per CBC, Section 1609
Risk Category IV

LOAD COMBINATIONS
Per CBC, Section 1605

SEISMIC LOADS
Per CBC, Section 1613

Page 109 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 10

Page 10 ends

SEISMIC LOADS DESIGN FACTORS
(PER GEOTECHNICAL REPORT)
Ss 1.83g
S 1 0.68g
SDS 1.32g
SD1 1.34g
Site Class Default
Risk Category IV
Importance Factor, I 1.5
F. MATERIAL PROPERTIES

1. Concrete: All Structural concrete mixes shall be Type II/V cement. All structural concrete shall have a minimum compressive strength at 28 days as follows:

CONCRETE
Foundations f’c = 4,000 psi minimum (145 pcf)
Concrete on metal
decks
f’c = 3,000 psi minimum (115 pcf)
Slab -on-Grade f’c = 4,000 psi minimum (145 pcf)
Columns, Slabs,
Beams & Shea r
Walls
f’c = 4,000 psi minimum (145 pcf)
(145 f
)

2. Structural Steel: All Structural steel shall be ASTM A992, Grade 50, unless noted otherwise.

STRUCTURAL STEEL
Steel Angles and
Channels
ASTM A 992, Grade 50 (Fy = 50 ksi)
Structural Tubes
(Rectangular and
Round)
ASTM A500, Grade C (Fy = 50 ksi)
Structural Pipes ASTM A53, Grade B (Fy = 35 ksi)

Page 110 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 11

Page 11 ends

BOLTS
Structural Bolt Bolt connections shall be A325X bolts
unless noted otherwise.

Gravity Column
Anchor Bolts
ASTM F1554, Grade 36
Seismic Column
Anchor Bolts
ASTM F1554, Grade 55

ELECTRODE STRENGTH
E80XX (Reinforcing Steel)
E70XX (Structural Steel)

END OF STRUCTURAL SYSTEMS SECTION
005 BUILDING EXTERIOR
A. EXTERIOR WALL S

1. Exterior walls shall conform to structural engineering criteria for framing . All framed exterior wall s shall have full thickness batt insulation with 1" foil faced polyiso continuous insulation (CI) with 16 GA Zee girts with 5/8" exterior gyp sheathing at the exterior wall face , or equal. Exterior wall assemblies shall have R21min insu lation.

2. CMU wall construction b asis of design:
a. Manufacturer: Orco Block
b. Product: 8x4x16 Shot Blast Block
c. Finish: Indio Gray

3. CMU wall mounted signage:
a. 10” high metal pan channel letters for building identification . b. Color: Black Stone (MP33348) by Matthews Paint Company.

4. Exterior Plaster. Design based on smooth texture applied over metal lath.

Plaster system basis of design: Parex Armourwall 300 Krak -Shield with WaterMaster a. WRB : WeatherSeal Spray & Roll -on
b. Plaster Slip Sheet : Building paper, JumboTex 60 min. c. Base Coat : Parex Fiber -47
d. Admixture : Parex Adacryl
e. Primer: Parex PrimeShield
f. Coating : Parex DPR Coating
g. Finish : Parex Image Smooth (VE Alternate - Parex DPR Standard Finish 533 Sand Smooth.) h. Paint Color: Reserved White (SW7056 ) by Sherwin Williams . i. System Warranty: 10 years min.

Page 111 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 12

Page 12 ends

5. Aluminum window wall & storefront system s. Factory finish Arcadia. Pre-finished frame color: (AB -8) Black.
a. Glazing ( GL -1) basis of design : High performance Low -E insulated glazing (1” thick) : U=0.29, SHGC=0.24, Viracon VZRE1 -46 or similar.
b. Storefront System basis of design : Arcadia System AFG451T (2”x4 1/2” Offset Glazing) c. Operable Casement and Fixed Window system basis of design : Arcadia System T200 E.

B. ROOF

1. Roofing assembly basis of design is metal roof over roof underlayment over the roof deck assembly . a. Manufacturer: AEP Span Span -lok with SpanSeam 180 O Seam, 12” coverage, 22 GA , b. Color: Cool Matte Black ,
c. Finish: Fluropon.
d. Roof underlayment: AEP Span “Underlayment HT”,

2. Roof mechanical wells: Fully adhered single -ply PVC roof over roof deck assembly . Roof covering Fire Resistance Classification: Class A. California Cool Roof System insulation thermal value (R) minimum of 30 using rigid insulation . Sarnafil G410-18 Feltback fiberglass reinforced membrane .

3. Manufacturer will supply to the owner a 30 years non -dollar limit edge warrantee. Warrantee must be non-pro-rated and must cover all labor and all material installed from the deck up.

4. Flashing, fascia, gutter assembly and miscellaneous roof metals to be prefinished to match Black Stone (MP33348) by Matthews Paint Company.

5. Min R value at roof: R30
C. DOORS/FRAMES

1. Exterior Doors
a. Entrance doors with sidelight are a 8’-0” tall aluminum storefront window system with 1" insulated glazing .
b. Entrance doors to be pre -finished 8’-0” tall aluminum framed doors, with wide stile (5” wide) c. Fire Apparatus Bay front and rear doors shall be motorized sectional steel doors with Lift Clearance Track , prefinished ( equal to Overhead Door Corp. Model 521 with SolarBan 70XL Argon Filled glazing ).
1) Controls for the doors shall be installed in common control panels with controls at two locations for parallel control arrangement. Front doors shall have both individual controls and a single button to open both front doors simultaneously. 2) Motor shall be equal to Overhead Door Corp. Model RSX with the fastest available opening speed for front App Bay doors.

2. Interior Doors
a. Interior doors to be 8’-0” tall aluminum knock down frames with solid -core, flush wood, custom grade, closed -grain hardwood veneer face with clear sealer. b. Knockdown door frames to be clear anodized finish.
c. Sidelites at interior doors shall have ¼” clear tempered glazing , set in aluminum knock down frame, to match door frames.

3. Door Hardware
a. All door hardware shall meet ADA requirements and shall have a brushed aluminum finish or satin chrome finish as available on each item .
b. All exterior entrance doors shall have card reader s for access control. c. Doors in stipulated STC rated walls shall be provided with automatic door bottoms.

END OF BUILDING EXTERIOR SECTION

Page 112 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 13

Page 13 ends

006 BUILDING INTERIOR
A. GENERAL DESCRIPTION

1. The building will be designed in accordance with the Essential Services Seismic Safety Act and is classified under Risk Category 4. All detailing for ceilings, millwork, partition types, and equipment installation will be designed to comply with the requir ed increased importance factor (similar to Healthcare or DSA project, not a typical Office project).

2. All interior walls shall be 5/8” Type ‘X’ gyp board with level 4 painted finish, over 4” metal studs typically, unless noted otherwise.
a. Provide cement backer board at tile installations. If interior partitions are full height, studs & gypsum board to be on both sides full height, with sound attenuation insulation. b. Provide moisture-resistant gypsum board in restrooms, shower rooms, and decontamination room where tile is not specified .
c. At all Corridor/Hallway walls and other high -traffic locations, gypsum board shall be high - Impact type to 8’ -0” min. Corners to be square with corner bead and corner guards to be provided as noted on the Finish Plan .
d. Dorm rooms shall be separated from other spaces by providing wall and ceiling construct ion with min 50 STC rating.

B. FLOORING FINISH MATERIALS

1. Polished Concrete (PC -1):

Location: Dorms, Day Room, Laundry, Kitchen , All Offices, Storage Rooms , Corridors , Restrooms.

Specification Requirements: CPC (Concrete Polishing Council) Aggregate Exposure: B .

CPC Finish Gloss Finish: Satin
Provide PROSOCO "Consolideck System", or equal.

DCOF (wet) : 0.42 min

2. Polished Concrete (PC -2):

Location: Apparatus Bays , Turnout Gear, Workshop, Medical Storage.

Specification Requirements: CPC Aggregate Exposure: ACPC Finish Gloss Finish: Flat Provide PROSOCO "Consolideck System", or equal.

DCOF (wet): 0.42 min

3. Sheet Resilient Flooring (RF -1):

Location: Shower s / Decontamination
Specification requirements: Sheet Width: At least 78 inches wide, Thickness: 0.08 -inch (2.0mm) and

0.12-inch (3.0mm) Shore A Hardness: At least 85, when measured in conformance with ASTM D 2240. Color: Product Options indicated on the Drawings or selected by the Architect. Seaming Method: Heat welded. Weld Rods: Manufacturer’s standard solidified adhesive welding rod. Base:

Integral flash cove. Finish: Equal to Altro Aquarius Wet Room Flooring.

4. Rubber Sports Flooring (RB -1):

Locations: Weight Room
Specification requirement: 24” square x 3/8” thick 2/3 of total area. Equal to Johnsonite Triumph sports flooring.

5. Sealed Concrete (SC -1)
Location s: Electrical Room, Fire Riser, and Air Compressor .

Page 113 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 14

Page 14 ends

Specification requirements: Concrete sealer shall be a water -based non -staining dissipating translucent resin conforming to ASTM C309, Type 1, Class B , and ASTM C1315, Type 1, Class B Provide Euclid Chemical “Super Aqua -Cure Vox ", or equal.

6. Static Dissipative Flooring with Electrical Grounding (SDT) :

Location : MDF.

Specification requirements: Armstrong Excelon SDT 12” x 12”.

C. BASE TYPES

1. Everywhere U.N.O. (B -1)- 4” rubber cove base

2. Apparatus Bays and Turnout (B -2) - 4” Metal cove base

3. Showers / Restrooms (B -3) - 4-6" coved / bullnose tile base D. WALL FINISHES

1. Eggshell - Gloss Paint (P -1, P-2, P-3) TYP – Eggshell finish , typical; allow for ( 2) accent colors. Dark wall colors to have Level 5 Finish, all other walls Level 4. Semi -gloss paint at Restrooms. Gloss paint at trim.

2. Porcelain Wall Tile (T -1) – Kitchen –Tile at backsplash, see finish plan for locations . Mfg: Cross ville, Series: Size: 4” x 16”.

3. Wall Protection Systems (WP -1) - at Apparatus Bay and Turnout Gear walls. Inpro, Koroseal or C/S Group Acrovyn or equal. 4” to 48” AFF. Include all trim pieces for installation.

4. Shower Wall Panels (WP -2):

Locations: Restrooms / Shower s - 8’-0” high at all walls. Altro Prism Decorative S hower Walls. Trim per manufacturer.

5. Mirrors:

Fitness room –starting at +4” to +8’ -0” on one (1) wall.

Corner Guards (CG) – Provide at each location per plan - 2”x2” Stainless Steel corner guards to 8’ -0” high.

6. Acoustical Wall Paneling (AWP -1)– 1” thick Upholstered wall Treatment in the Weight Room and Day Room. Specification by Fabritrak or equal.

7. Janitor closet and Decontamination (FRP) – Fiberglass reinforced plastic wall protection panels at all walls, unless otherwise noted. Provide full height.

E. CEILING FINISHES

1. ACT -1 Acoustical Suspended Ceiling System:

Location : Per Plan
Specification requirements: Moderate acoustical performance such as Armstrong Fine Fissured or USG Mars, 2’x4’ with 15 /16” Suspension grids at 10’ -0” high. All walls will penetrate grids.

2. Exposed Metal Deck:

Location : Per Plan

Page 114 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 15

Page 15 ends

Specification requirements: Paint all exposed elements white

3. GYP -1 Gypsum Board Ceilings and Soffits:

Location : Per Plan
Finish is eggshell paint, match P -1.

4. GYP -2 Water and Mold Resistant Gypsum Board:

Location : Per Plan (at Restrooms & Showers , and other wet areas ) Specification requirements: Finish is semi-gloss paint, match P -1.

F. CASEWORK

1. Kitchen 104:
a. Wood base , upper and tall cabinets, stainless steel countertops with front edge lip to catch water and integral backsplash. Combination adjustable shelves and storage drawers, and custom pull out trash hardware. See Floor Plan for additional casework information.

2. Laundry/Janitor 108:
a. Plastic laminate all base and upper cabinets, solid surface countertops with front edge lip to catch water and integral backsplash. Combination adjustable shelves and storage drawers.

3. Non-rated Corridor 107 :
a. Plastic Laminate all base and upper cabinets, Plastic Laminate Tops. Combination Adjustable shelves and storage drawers.

4. All restrooms:
a. Restroom countertops , Solid surface with undermount porcelain sink and removable plumbing shield.

5. Dorms 112, 113, 114, 115, and 116:
a. Plastic laminate countertop and tall storage closets with clothing rod and adjustable shelves.

G. RESTROOM ACCESSORIES

1. Restroom accessories:
a. Bobrick or eq.
b. Full WIDTH MIRRORS AT SINKS .

2. Phenolic shower benches - ACCESSIBLE AND STANDARD, SHOWER RODS/CURTAINS.

3. Utility shelves in each restroom. 5” x 16”.

H. FIXTURES AND EQUIPMENT

1. See Equipment plan and schedule , OFOI, CFCI as noted.

2. All residential appliances to be Energy Star Certified.

3. Metal Shelving: Per Plan
I. ARCHITECTURAL MISCELLANEOUS

4. Window shades: See locations on Equipment / Furniture Plan

5. Metal Shelving: See locations on Equipment / Furniture Plan

6. Marker Boards : See locations on Equipment / Furniture Plan

END OF BUILDING INTERIOR SECTION

Page 115 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 16

Page 16 ends

007 MECHANICAL SYSTEMS
A. GENERAL DESCRIPTION
The new mechanical systems for this project are anticipated to be all -electric and will primarily provide conditioning via variable refrigerant flow (VRF) heat recovery condensing units coupled with indoor fan coils serving the various zones.

1. Design Criteria/Design Calculation Guidelines
a. Project Location & Climate
Gilroy , CA
California Climate Zone: 4
Latitude: 37° North
Longitude: 121.6° West
Elevation: 194’
Cooling Design Temperature: 105°, 70° MCWB (0.1%)
Wetbulb Design Temperature: 72° (0.1%)
Heating Design Temperature: 28° (0.2%)
b. Indoor Design Conditions, Office Areas
People: 250 gross square feet per person
Lights: 0.60 watts/square foot
Equipment: 0.75 watts/square foot
Temperature: Summer – 74°F ( ± 2°F)
Winter – 70°F ( ± 2°F)
Humidity: No direct humidity control required.

Ventilation: 30% greater than required by CMC (ASHRAE 62.1) c. Indoor Design Conditions, Main Entry Lobby
People: 100 gross square feet per person
Lights: 0.70 watts/square foot
Equipment: 0.25 watts/square foot
Temperature: Summer – 74°F ( ± 2°F)
Winter – 70°F ( ± 2°F)
Humidity: No direct humidity control required.

Ventilation: 30% greater than required by CMC (ASHRAE 62.1) Exhaust: Space to be negative relative to adjacent spaces. d. Indoor Design Conditions, Dorm Rooms
People: 120 gross square feet per person
Lights: 0.40 watts/square foot
Equipment: 0.25 watts/square foot
Temperature: Summer – 74°F (± 2°F)
Winter – 70°F (± 2°F)
Humidity: No direct humidity control required.

Ventilation: 30% greater than required by CMC (ASHRAE 62.1) Interlock: Provide new window sensor for operable window to setback VRF fan coil temperature setpoint when window is in open position.

Page 116 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 17

Page 17 ends

e. Indoor Design Conditions, Weight Room
People: 100 gross square feet per person
Lights: 0.50 watts/square foot
Equipment: 0.25 watts/square foot
Temperature: Summer – 74°F ( ± 2°F)
Winter – 70°F ( ± 2°F)
Humidity: No direct humidity control required.

Ventilation: 30% greater than required by CMC (ASHRAE 62.1) Exhaust: Space to be negative relative to adjacent spaces.

Interlock: Provide door sensor for sectional door to reduce HVAC flow and temperature setpoints when door is in open position.
f. Indoor Design Conditions, Kitchen
People: 40 gross square feet per person
Lights: 0.95 watts/square foot
Equipment: 1.00 watts/square foot
Temperature: Summer – 74°F ( ± 2°F)
Winter – 70°F ( ± 2°F)
Humidity: No direct humidity control required.

Ventilation: 30% greater than required by CMC (ASHRAE 62.1) Exhaust: Space to be negative relative to adjacent spaces. g. Indoor Design Conditions, Dining / Day Room Area s
People: 35 gross square feet per person
Lights: 0.40 watts/square foot
Equipment: 0.50 watts/square foot
Temperature: Summer – 78°F ( ± 2°F)
Winter – 62°F ( ± 2°F)
Humidity: No direct humidity control required
Ventilation: 30% greater than required by CMC (ASHRAE 62.1) h. Indoor Design Conditions, Laundry /Janitor
People: 100 gross square feet per person
Lights: 0.45 watts/square foot
Equipment: 0.75 watts/square foot
Temperature: Summer – 74°F ( ± 2°F)
Winter – 70°F ( ± 2°F)
Humidity: No direct humidity control required.

Ventilation: 30% greater than required by CMC (ASHRAE 62.1) Exhaust: Space to be negative relative to adjacent spaces. i. Indoor Design Conditions, Decontamination
People: 100 gross square feet per person
Lights: 0.45 watts/square foot
Equipment: 0.75 watts/square foot
Temperature: Summer – 78°F ( ± 2°F)
Winter – 70°F ( ± 2°F)
Humidity: No direct humidity control required.

Ventilation: 100% OSA
Exhaust: 100% exhaust from space sized for 10 air changes per hour. j. Indoor Design Conditions, Turnout Gear

Page 117 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 18

Page 18 ends

Lights: 0.45 watts/square foot
Exhaust: 10 air changes per hour
Makeup Air: 100% of exhaust air, make -up from gravity intake hoods . k. Indoor Design Conditions, Apparatus Bay
Lights: 0.65 watts/square foot
Exhaust: Direct connections to truck exhaust (Plymovent system, or similar) Makeup Air: 100% of exhaust air, make -up from gravity intake hoods .

Heat: Provided by i nfrared heaters (Infratech WD -60, or similar ). l. Indoor Design Conditions, Restrooms
Lights: 0.60 watts/square foot
Exhaust: Greater of 100 cfm/fixture or 10 air changes per hour Makeup Air: 100% of exhaust air, make -up from adjacent spaces . Restrooms with door sweepers to have transfer boots with ceiling grilles on each side of the full height wall to allow transfer air .

2. Zoning
Each fan coil unit (zone) will be dedicated to a unique room, building orientation, floor level, and interior use. On average, there will be one fan coil zone per 1000 sf. Dorm rooms, offices, and unique uses will have dedicated fan coil zones. Up to three perimeter offices will be served by a single, shared fan coil zone.

3. Energy Conservation Calculations
The HVAC design shall utilize the above design criteria as a basis and shall also comply with the 202 5 State of California Energy Code California Code of Regulations (CCR), Title 24 and Building Standards. The performance based “whole building” model compliance approach shall be used.

4. HVAC Equipment
The building will be conditioned by a dedicated VRF heat recovery system with ducted and ductless fan coils throughout the various spaces. Building ventilation to be provided through an energy recovery ventilator unit. All of the mechanical equipment in the building is anticipated to be on emergency power .

Alternate mechanical system types will be considered for the building if the above noted design criteria and zoning conditions can be met.
a. Electrical service connections to HVAC equipment will be from dedicated HVAC electrical panels. b. VRF -1:The building will be conditioned by an approximately 12ton variable refrigerant flow (VR F) heat recovery condensing unit located on the ground near the electrical room. VRF -1, serving the building fan coil units, will consist of a single condensing module with R-32 refrigerant (Daikin, or similar). The module will be independently powered, anchored and externally isolated using neoprene waffle pads (Mason Super W, or similar) , and will have a master controller with BACnet compatibility.
c. ERV -1:The building will have ventilation and exhaust air provided by a 950 cfm energy recovery ventilator unit (Greenheck model ECV , or similar) located on the roof. Ventilation air ducts will be ducted through the building and be coupled with various VRF fan coils in each thermal zone throughout the space. ERV -1 will be paired with VRF-1fan coils. Return/exhaust air back to the unit shall be fully ducted in the ceiling space via l ow pressure return ducts to the dedicated outdoor air systems where it will pass over the heat recovery core before being exhausted. ERV -1 will include ECM supply and exhaust fans, heat recovery core, MERV 13 filtration, and BACNet controls. Unit should also be mounted on an acoustic vibration isolation curb (Vibrex VIC-EQ, or similar)

Page 118 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 19

Page 19 ends

d. VRF Fan Coils (VFC -1 to VFC -11): Each thermal zone in the new building will include a VRF fan coil (Daikin model FXZQ, FXMQ, FXAQ, or equal). The type of fan coil provided in each zone will depend on the requirements of the space – ceiling cassette type for small spaces requiring separate zone control, highwall type for utility spaces with no ceiling, and ducted fan coils for units for large spaces.

Each fan coil will have a ventilation air duct coupled with the unit, washable filter (cassettes), MERV 13 filter (ducted units with MERV 13 Air Filter and Cabinet Kit, or similar), factory integral condensate pumps for cassette & ducted units, field mounted condensate pumps for highwall units (Aspen DACA -CP1-1, or similar), 2-row cooling coil, and BACnet controls. e. Process Cooling Equipment (1-to-1 split systems) : Air-cooled mini split systems will provide 24/7 conditioning of MDF and Electrical rooms. Units to use R-32 or R-454B refrigerant. i. FC -1 / CU-1:Electrical 121 will be served by an approximately 3 ton highwall ductless fan coil unit (Daikin FTXV36AVJU9 / RXV36AVJU 9, or similar).
ii. FC -2 / CU -2: MDF 123 will be served by an approximately 3 ton highwall ductless fan coil unit (Daikin FTXV36AVJU9 / RXV36AVJU9 , or similar).
iii. FC -3 / CU -3: Decontamination 130 will be served by an approximately 4 ton 100% O/A ducted fan coil unit (Daikin FXMQ48MFVJU / RX TQ48TB VJU B, or similar). This unit will need to be updated to the equivalent R-32 unit as soon as it is available from the manufacturer.
iv. Condensing units will be located on the roof .
f. Refrigerant Leak Detect ion: Each VRF zone indicated on the plans shall have a VRF refrigerant leak sensor mounted on a wall within 12” of the finished floor level (Macurco model RD-VRF, or similar). g. Multi Port Branch Selector Boxes (BS): The building heat will be provided by the VRF system in conjunction with various BS boxes throughout the space (Daikin model BSQ , or similar). The BS boxes will be interlocked with the main VRF system and will have control boards to communicate with the VRF main controller .
h. Refrigerant Safety Shut-Off Boxes (SOV): The refrigerant piping branches of the VRF system will include safety shut-off boxes to limit the amount of potential R32 refrigerant released into the building in the event of a pipe leak in the system (Daikin model SVA , or similar). The SOV boxes will be interconnected with the main VRF system and will have control boards to communicate with the VRF main controller if they have closed due to leakage being detected . The quantity of SOVs required will be determined by the size of the rooms and the amount of refrigerant in each branch. i. Exhaust Systems:

1. EF -1:Dryer booster fan, approximately 80 cfm, will be provided for the dryer exhaust in the laundry room (Fantech DBF 4XLT, or similar) . Dryer to be controlled via a pressure sensor mounted in the ductwork.

2. EF -2: Rooftop exhaust fan, approximately 200 cfm, will be provided for the Turnout Gear exhaust (Greenheck CUE or similar).

3. EF -3: Rooftop exhaust fan, approximately 40 0 cfm, will be provided for the Decontamination room, restroom 131, and storage 128. (Greenheck CUE or similar).

4. EF -4: Rooftop exhaust fan, approximately 300 cfm, will be provided for the drying cabinet in the decontamination room. (Greenheck CUE or similar). Fan to be interlocked with drying cabinet.

5. Apparatus Bay Vehicle Extraction System (VEF -1): The apparatus bay will be equipped with a vehicle extraction system (Plymovent, or similar). The extraction system shall include the following:
(i) Roof mounted exhaust fan (Plymovent model TEV, or similar). Fan to be equipped with a weatherproof enclosure and pressure sensors for fan activation. (ii) A filter housing with MERV 8 pre -filters and 95% final filters

Page 119 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 20

Page 20 ends

(iii) One long straight rail in each apparatus bay to run the full length of the bay outfitted with 2 hoses per rail, crab return assemblies, balancer, saddle & hose loop for 25ft 4ӯ hose, pneumatic fill valve and grabber nozzle and complete pneumatic circuit for pa ssive release auto crab/trolley return with safety switch. System to be designed for two apparatuses stored in tandem in each bay with the ability to add a third hose to each rail to be able to store three tandem or remove a hose for a single long app aratus. (iv) Control panel provided to control the vehicle exhaust system. Controls to allow for manual or automatic control of the fan. Control box to also include an alarm device that can be used for status control of the airflow in the exhaust system. j. Gravity Intake Units:

1. IH-1: Rooftop gravity intake hood, approximately 2,000 cfm, will be provided for apparatus bay exhaust air makeup (Greenheck GRSI or similar).

2. IH-2: Rooftop gravity intake hood, approximately 200 cfm, will be provided for the Turnout Gear exhaust air makeup (Greenheck GRSI or similar).

3. IH-3: Rooftop gravity intake hood, approximately 200 cfm, will be provided for the Decontamination room exhaust air makeup (Greenheck GRSI or similar). k. Infrared Heaters (IR-1 to IR-6):

1. Infrared heaters to be provided in apparatus bay along sides of apparatus bay (Infratech WD - 60, or similar). A total of 6 heaters anticipated (3 on each side) , equally spaced across the length of the bay, and mounted at 12ft above the finished floor. l. Ceiling Fans:

1. CF -1: Ceiling fan, 60” diameter, will be provided for the Weight Room ( Big Ass Fan Haiku L , or similar). Ceiling fan to include wall controller.

5. HVAC Equipment Additional Notes
a. The fire station building is considered an essential facility and will have the majority of the mechanical systems on emergency power.
b. HVAC testing, adjusting and balancing agent will be certified by AABC or NEBB. c. HVAC systems commissioning will be provided in accordance with California Energy Code.

6. HVAC Ductwork and Accessories
a. Comply with SMACNA HVAC Duct construction Standards, Metal and Flexible (SMACNA), Fourth Edition, 2021 and NFPA 90A.
b. Ductwork shall be galvanized steel with G -90 zinc coating, ASTM A 653, minimum 26 gauge, unless otherwise noted. Assume plenum return air system with limited return air ductwork. c. Concealed HVAC supply air ductwork shall be insulated with mineral fiber insulation and ASJ jacket per California Energy Code standards.
d. Duct silencers shall be provided at main supply and return /exhaust to each ERV unit. e. Combination fire/smoke dampers, integrated with area -wide fire alarm, will be provided as required at occupancy separations.
f. Flexible ductwork shall be provided for final 5 -foot connection to supply air diffusers.

Page 120 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 21

Page 21 ends

7. Grilles and Diffusers
a. General ceiling supply diffusers to be steel, plaque faced. Ceiling mounted return and exhaust grilles to be steel, louver face. Diffusers and grilles to be compatible with ceiling and wall conditions, field painted where required to match custom wall colo rs.
b. Grilles and diffusers located in locker rooms, restrooms, and shower rooms to be aluminum. c. Supply diffusers in exposed ceiling areas to be spiral duct mounted type. Return air in exposed ceiling areas to be minimized to large open -ended ducts covered with wire mesh. d. Air distribution in all lay-in T-bar ceiling areas will be plaque face type. Air distribution in hard lid areas will be linear diffusers (Price, Titus, Krueger or equal).

8. Volume Dampers
Manual volume dampers will be provided in branch ducts to each diffuser. In areas with hard ceilings and non - accessible areas, remote balancing damper controllers (Young Regulator EBD, or similar) will be provided at each inlet or outlet in lieu of manual dampers.

9. Refrigerant Piping and Accessories
Type L copper tubing with soldered joints shall be provided for refrigerant piping distribution. Refrigerant piping shall be insulated with 1” elastomeric foam pipe insulation.

10. HVAC Controls
a. A Building Management System (BMS) is not anticipated to be utilized in the facility and all units are to be provided with programmable thermostats. Equipment to be provided with BACnet provisions to accommodate potential future BMS installation.

11. Seismic Restraints
HVAC ductwork and pipe support to comply with SMACNA Seismic Restraint Manual, Guidelines for Mechanical Systems, Third Edition 2008.

END OF MECHANICAL SYSTEMS SECTION
008 PLUMBING SYSTEMS
A. OVERVIEW
The plumbing scope of service for this project is to provide complete plumbing design for a new single -story fire station. The new building shall be provided with complete domestic hot and cold water, sanitary soil, waste, vent, and storm drainage piping systems.

B. CODES AND GUIDELINES
All aspects of the design shall follow the requirements of the current California Plumbing Code and CalGreen standards for plumbing fixtures. Additional Regulations and Standards shall include as a minimum:
• ANSI ‐ American National Standards Institute Inc.
• ASHRAE ‐ American Society of Heating Refrigerating and Air Conditioning Engineers Handbooks
• ASME ‐ American Society of Mechanical Engineers Guidelines and Standards • AWS ‐ American Welding Society
• CAL/OSHA ‐ California Occupational Safety and Health Administration • CBC ‐ California Building Code
• CCR ‐Title 24 California Code of Regulations
• CFC ‐ California Fire Code

Page 121 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 22

Page 22 ends

• CPC ‐ California Plumbing Code
• NFPA ‐ National Fire Protection Association Guidelines and Standards • SFM ‐ California State and local Fire Marshal
C. PLUMBING FIXTURE Water Efficiency
Plumbing fixtures installed in the project will meet or exceed the water efficiency requirements of the 2025 California Green Building Standards (CalGreen) code. The maximum water uses for each indoor plumbing fixture type installed in the project shall be:
• Water closets: 1.28 GPF
• Urinals: 0.125 GPF
• Lavatories: 0.5 GPM
• Sinks 1.8 GPM
• Showers 1.8GPM
D. ACCESSIBILITY
Accessible plumbing fixtures in each restroom will comply with the requirements of the Americans with Disabilities Act (ADA) and all California requirements for accessibility.

E. CALIFORNIA AB 1953 COMPLIANCE
Potable water system fixtures, materials, valves, and appurtenances to be in compliance with California Assembly Bill 1953, which limits the allowable lead content in certain domestic water system components.

F. SITE UTILITIES
Refer to “003 – SITE PLANNING” for site domestic water, sewer, and storm drain basis of design.

G. PLUMBING PIPING MATERIALS

1. DOMESTIC WATER PIPING
Piping within the building and above grade shall be Type "L" ASTM B88, hard drawn copper tubing with wrought copper sweat fittings per ANSI B16.18 and B16.22. Below grade piping outside of the building within five feet (5') of the foundation shall be Type "K" ASTM B88, hard drawn copper with wrought copper sweat fittings per ANSI B16.18 and B16.22. Below slab piping shall be Type "K" soft annealed copper tubing with no fittings below the slab.

2. SANITARY SOIL, WASTE PIPING
Soil and waste piping within the building and outside within five feet (5') of the foundation shall be no -hub cast iron pipe and fittings conforming to CISPI Standard 301 -04 or ASTM A -888-04 with Heavy -Duty No-Hub Couplings conforming to ASTM C -1540 and AS TM C-564.

Plumbing fixtures above grade shall be drained by gravity to the site sanitary drainage system. Gravity drainage system shall maintain a minimum slope down of 2% in the direction of flow except where indicated otherwise.

3. SANITARY VENT PIPING
Same as specified for sanitary soil and waste piping except with Standard Duty No -Hub Couplings conforming to CISPI Standard 310 and ASTM C -564.

Vents from fixture traps shall be extended through and terminate a minimum 12” above roof and shall be located a minimum of 10 feet from building outside air intakes. Exposed vent piping shall be Schedule 40 galvanized steel pipe, ASTM A53.

Page 122 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 23

Page 23 ends

4. FACILITY STORM DRAINAGE PIPING
Storm drain piping within the building and outside within five feet (5') of the foundation, and overflow drain piping within the building shall be no -hub cast iron pipe and fittings conforming to CISPI Standard 301 -04 or ASTM A-888-04 with Heavy -Duty No-Hub Couplings conforming to ASTM C -1540 and ASTM C -564.

Roof drains, overflow drains and leaders shall be designed for a minimum of 2‐inch per hour rainfall unless directed otherwise by the local building authority. Overflow drain piping shall "daylight" to the building exterior and be provided with downspout covers as indicated on the plumbing plans.

Perimeter Gutters and Downspouts will be provided as required, materials to be determined. Coordinate with architectural plans.

5. CONDENSATE DRAINAGE PIPING
Condensate drain piping shall be Type "M" ASTM B88, hard drawn copper tubing with wrought copper sweat fittings.

6. INDIRECT WASTE
Indirect waste piping shall be Type ”L” ASTM B88, hard drawn copper tubing with wrought copper fittings as specified for water piping.

7. PLUMBING INSULATION
Piping for service hot water systems shall be insulated with preformed fiberglass pipe insulation with all service jacket, per California Title -24 standards.

H. PLUMBING FIXTURES

1. Plumbing fixtures by Sloan, Zurn, Kohler, American Standard or approved equal.

2. Water closets shall be water efficient 1.28 GPF manual flushometer valves, wall mount vitreous china with siphon jet action, elongated bowl with open front seat, in both ADA and non -ADA compliant configurations as applicable.

3. Restroom lavatories shall be undermounted vitreous china with manual 0.5 GPM faucet, with prewrapped trap and supply covers, loose key stops, and rigid supplies. ADA compliant.

4. Kitchen area sinks shall be undermount stainless-steel ADA single bowl for use with solid surface countertops, HW/CW with 1.5 GPM kitchen faucet with prewrapped trap and supply covers, loose key stops, rigid supplies, and garbage disposal.

5. Kitchen areas to be provided with connections for dishwasher, filtered water dispenser and coffee machine(s).

6. Icemaker supply box with shut -off valve will be provided at all refrigerators.

7. Interior bottle fillers shall be stainless steel, refrigerated and filtered with recessed compressor.

8. Showers shall be recessed mount, thermostatic mixing valve actuation, with HW/CW, 1.8 gpm showerheads, ADA compliant showers to include in addition a fixed showerhead and control valve. Floor drains shall be cast iron body with flashing collar and nickel -bronze adjustable strainer.

9. Service sinks shall be free standing stainless steel with HW/CW wall mount faucet with integral vacuum breaker, hose, pail hook, and vinyl rim guard.

10. Floor drains with trap primers shall be provided in all restrooms and laundry / decontamination rooms.

11. Provide a wall mounted hose bibb in restrooms for wash down.

12. Provide floor drains with trap primers in the Laundry Room and the Decontamination Room.

13. Provide floor sinks with trap primers at Decontamination Room and as indicated on plans and as required.

14. Provide two -compartment stainless steel, floor-mounted utility sink HW/CW with 1.5 GPM with goose neck faucet with wrist blade handles in Decontamination Room.

15. Provide additional one -compartment stainless steel, floor-mounted utility sink, HW/CW with 1.5 GPM with goose neck faucet with foot pedal activation located adjacent to Decontamination Room.

16. Provide wall mounted clothes washer supply box in the Laundry Room and an indirect drain to a floor trough drain with lint trap at extractor in the Decontamination Room.

Page 123 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 24

Page 24 ends

17. Provide downspout covers to the overflow drain pipe termination. Coordinate with architecture the height location of the fixtures.

18. Provide trench drains at Apparatus Bays running the length of the bay as indicated on plans. Coordinate exact length and location with Architectural design. P -traps shall be provided with a trap primer connection.

Drainage from Apparatus Bay trench drain s shall extend to the site and discharge to a Sand and Oil Interceptor and Sample Box before continuing to the city sanitary sewer connection.

19. Provide icemaker with floor sink, as indicated on plans, adjacent to the Apparatus Bay .

20. Floor sinks will be provided in the Air Compressor room and the ice machines .

21. Exterior hose bibbs around the building shall be recessed lockable box type with integral vacuum breaker.

Rooftop hose bibbs shall be free standing with integral vacuum breaker.

22. Provide hub drain with electric trap primer will be installed for fire riser test drain.

23. Provide hose reels with quick disconnect adaptors. Hose reels to be located in the Apparatus Bay and mounted at a minimum 9’-0” above finished floor.

I. PLUMBING EQUIPMENT

1. Domestic Water Heating
a. This project will include a tank type electric water heating system with expansion tank, drain pan and drain to receptor located in the Laundry/Janitor room . Hot water will be controlled to a supply temperature no more than 140 degrees Fahrenheit to serve all lavatories, sinks, and service sinks. Point of use thermostatic mixing valves located at the lavatories will provide tempered water. The hot water system will be fully circulated with a pump interlocked to an aquastat allowing for control of the circulating system. Water heater(s) shall be a A.O. Smith or approved equal. b. Electric instantaneous point of use water heaters may be provided as required to serve remote fixtures requiring hot water. Water heaters shall be Eemax, Chronomite or equal.

2. Compressed Air System:
a. The Air Compressor shall be sized per owner equipment requirements. DBE shall provide the Air Compressor, compressed air piping to equipment and provide a floor sink for indirect drainage from the Air Compressor. All compressed air piping shall terminate with quick disconnect adaptors per owner specified connection type. Refer to plumbing plans for specification

3. Domestic Water Anti -Scale Filtration
a. The anti-scale shall be sized per GPM demand of the building. Domestic water to be routed through the anti-scale system prior to the final plumbing fixture location.

J. PIPE TESTING

1. All piping systems shall be tested in accordance with the applicable service as indicated in the California Plumbing Code.

2. All new water piping shall be disinfected/sterilized as directed by the California Plumbing Code.

END OF PLUMBING SYSTEMS SECTION

Page 124 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 25

Page 25 ends

009 ELECTRICAL SYSTEMS
A. MAIN SWITCHBOARD MSB
A new MSB at 800A -120/208V -3PH-4W shall be located in the main electrical room and served from the PG&E transformer located on the site.

B. EMERGENCY GENERATOR
A new 350kW emergency generator with 2000 gallon base mounted fuel tank shall be located on the site. The generator will serve as emergency back -up for the entire building for 72 -hours. The generator will serve the building through an 800A automatic transfer switc h and emergency distribution board.

The generator will be located outdoors in a weatherproof enclosure , sound attenuating muffler system and diesel particulate filter . The base fuel tank will hold enough diesel fuel to power the station for three days. T he basis of design is Rehlko Generators.

Comply with federal (EPA), state, and local regulations applicable at the time of commissioning; include factory emissions certification with submittals.

C. FUTURE SOLAR READY
The MSB will have a section reserved for Solar Readiness and Battery Energy Storage System (BESS) connection dedicated to Solar PV .

D. POWER

1. GENERAL REQUIREMENTS
a. Multiple power and lighting panelboards will be provided as required. Lighting loads will be connected at 120 volts, single-phase, HVAC /Plumbing loads will be connected at 120 volts, single-phase or 208-volt, 3- phase, Receptacle loads will be connected at 120 volts, single -phase. b. Typical receptacles, switches and wiring devices to be specification grade, white in color, decora type with specification grade stainless steel faceplates.
c. Dedicated GFI receptacles shall be provided in restrooms and on the exterior of the building. d. EV charging stations will be based on the number of parking spaces provided on site .

E. LIGHTING

1. GENERAL REQUIREMENTS
a. Lighting system shall be designed to comply with the California Energy Code and Title 24. b. All lighting shall conform to the latest IES Recommended Practices (RP s) and IES G -1-22 “Guide for Security Lighting for People, Property, and Crit ical Infrastructure”. c. Lighting shall conform to City of Gilroy Zoning Code, including the Glen Loma Ranch Specific Plan, and Resolution No 2014-19; and amendments to the California Building code, including Ordinance 2025 -06. d. All fixtures shall be dimmable LED.
e. All illumination to be on emergency power.

2. INTERIOR LIGHTING
a. General Requirements
1) Color Rendering: 90 CRI minimum
2) Color Temperature: 3500K typical, with exception to specific fixtures where warmer color temperatures are beneficial to night -time activities such as sleeping . 3) Controls: All interior spaces shall have on/off/dimming controls . Where multiple layers of light are provided, individual zone control shall be provid ed for flexibility. Controls shall be accessible

Page 125 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 26

Page 26 ends

to occupants, except in publicly occupied spaces such as lobbies, where controls shall be accessible to authorized personnel only.
b. Scope / Design Considerations:
1) Offices, Conference Rooms, Corridors & Typical Spaces Throughout: 2x2 or 2x4 troffers. 2) Utility Spaces: Troffers or utility strip lights.
3) Lobbies/Reception: Fixtures shall be vandal resistant. Design shall include vertical illumination at specialty signage/wall graphics.
4) Dorms: Lighting design shall include a minimum of (2) layers of light, including a reading light with local switch control, and general overhead lighting . General overhead lighting shall provide sufficient illumination per IES recommendations, while balancing budget and visual comfort (either through a low UGR rating, indirect illumination , or other methods to soften the lighting and balance vertical and horizontal illumination).
5) Restrooms/Showers : Fixtures shall be shower rated, with dead front trims where applicable. 6) Dining/Kitchen : Design shall include direct and indirect illumination with multi -zone control.

Design shall also include decorative pendant over kitchen island. 7) Weight Room : Design shall include direct and indirect illumination with mutli -zone control. Direct fixtures shall not be located directly above fans and fixtures shall be placed such that they do not cause str obing .
8) Apparatus Bays : High volume linear fixtures or linear wraparounds . Fixtures shall be laid out between apparatus bays such that there is ample vertical illumination on the sides of fire trucks and equipment.
9) Decontamination : Fixtures shall be sealed and wash-down rated.

3. EXTERIOR LIGHTING
a. General Requirements
1) Color Rendering: 80 CRI minimum
2) Color Temperature: 3000K
3) Heights: Fixtures shall be at a maximum height of 20’ per City of Gilroy, Glen Loma Ranch Specific Plan, and Resolution 2014 -19.
4) Light Pollution: Design shall be sensitive to surrounding residential neighborhood. In addition to complying with all applicable CalGreen requirements, fixtures shall incorporate back -light, uplight, and glare control/shields where relevant to minimize light trespass and pollution.
b. Illuminance and Control
1) Lighting design shall be capable of providing a maintained average illuminance of 5fc with an average -to-minimum uniformity ratio not greater than 3:1 per IES standards. 2) Exterior illumination shall be controlled by timeclock and/or photosensors such that lights are automatically turned off during the day, and automatically turned on at night. 3) Poles shall be equipped with occupancy sensors for additional energy savings and to reduce light pollution within the neighborhood when the site is unoccupied. 4) Control shall be designed such that site lighting has a minimum of three settings. a) Emergency Response: During preparation and response to an emergency call for service, parking and station exit area lighting shall be raised to full output, providing the 5fc maintained average.
b) Stand -by Mode: Five minutes after all responding personnel and equipment have departed and the building is secured, illumination shall return to stand -by mode, to

Page 126 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 27

Page 27 ends

provide 1fc along paths of travel and egress, and a minimum of 0.5fc in parking and roadway areas. Stand -by mode shall be the primary mode when the site is occupied during night -time hours.
c) Unoccupied : After occupancy sensors sense 20 minutes of vacancy, lighting output shall be reduced to 50% of stand -by mode. Occupancy of the exterior site shall automatically raise the illumination back to Stand -by Mode levels, except when the Emergency Response mode is triggered.
c. Scope
1) Parking/Roadways: 20’ max, full-cutoff, dimmable poles with integral occupancy sensors 2) Pedestrian Paths: 40” bollards and/or step lights.
3) Entry Stairs: Integral handrail lighting, with integral driver post. Lighting and rails to be specified as one complete system (handrail, lighting, posts, and drivers provided by one manufacturer).
4) Entry Doorway: Recessed 3” downlight.
5) Flag Poles and Tree Accents : Ingrade, vandal and impact -resistant, adjustable uplights . 6) Wall Area Light s: Vandal, impact -resistant area lights. 7) Signage: Integral signage lighting by signage manufacture r. (Note: address number must also be illuminated).

END OF ELECTRICAL SYSTEMS SECTION
010 STRUCTURED CABLING SYSTEM
A. Telecommunications Service Entrance Room (MDF)

1. One (1) MDF room shall be provided per plan. The MDF room shall be air-conditioned and humidity controlled 24/7/365 and shall be equipped with a dedicated 100 Amp panel board (or higher depending on other equipment the department will be installing). The MDF room shall have a minimum of (3) 120v dedicated 20 -amp circuits and (2) 208 -volt 30 -amp circuits routed to outlets attached to overhead ladder tray (outlet types TBD). (2) 3” conduits will be installed from the MDF room to the roof with a weather head, in addition one 2” conduit to roof with weather head connection for GPS repeater system. (2) 2” conduits shall be installed over the apparatus bay to facilitate low voltage cabling pathways from one side of the bay to the other in both .

2. Provide (2) 4" conduit to from tel. company POC pull box and (2) 3" conduit from cable provider POC pull box to MPOE (MDF). Coordinate with local providers engineering departments for pathway requirements.

3. MDF room will have two walls covered with ¾” fire rated plywood finished and painted on one side.

4. The telecom will be designed using UL listed 19” X 7’ equipment racks with minimum 10” wide vertical cable management on both sides to hold patch panels and City of Gilroy provided data switch equipment . Voice and data terminations shall be on rack mounted patch panels. Panels to RJ45 patch cables will be used to connect data ports to switches. Patch cables will be used to connect voice ports to phone switch tail connections. Multi -pair voice grade cable will be run from the rack mounte d panels for cross -connection of phone switch tails and phone backbone cables.

CATV equipment will also be included in the racks. Overhead UL listed Telco style ladder tray will be used to hold and distribute all cables entering or leaving the room.

Page 127 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 28

Page 28 ends

B. Signal Grounding System

5. An appropriate ground bus bar shall be designed for the telecom room with a #2/0 green -insulated copper ground conductor to be connected to the Main Building Ground and #6 AWG conductor to building steel per TIA 607 standards. All cabinets, racks, conduits, AC units, UPSs, and electronics shall be bonded to the ground busbar with dedicated #6 AWG solid conductor green insulated wire and 2-hole compression lugs.

C. Cable System

1. Appropriately sized conduits shall be used to transition over closed gypsum board ceilings. Outlets for telecom service will have 1 ¼” conduits stubbed 6” above accessible ceiling for the horizontal cables. In inaccessible areas, conduits shall be designed to go directly to the cable tray or to the telecom room depending on the exact circumstance. 3” or 4” EZ Path UL listed firewall penetration systems shall be installed where required for cable access through fire -rated walls.

2. Category 6 cables for voice and data using a Structured Cabling Solution per City of Gilroy standard shall be installed. Horizontal CATV cables will be RG6.

D. Horizontal Cabling

1. All horizontal data/voice and CATV cables shall originate from the MDF.

E. Wireless Access

1. The building shall be provided with interior and exterior wireless access coverage utilizing City of Gilroy standard wireless access points (WAP’s). Provide complete design, engineering, installation , and conf iguration of the wireless netw ork to ensure continuous and reliable coverage with strong signal strength throughout the ent ire secured ar ea and extending a minimum of 15 feet beyond the secure perimeter fenc eline.

F. Station Outlet Configuration

1. Typical outlet configurations shall be one voice and two data jacks. Alternate outlet configurations to be used based on type of space will be 1) one voice, two data and one coaxial jacks, 2) one voice, two data and two multi -mode optics, 3) Voice wall jack and 4) all data jacks. Future wireless access point locations shall be cabled each with (2) Category 6 cables to a ceiling mounted enclosure. Electronics will be provided by City of Gilroy /IT.

G. Structured Cable Warranty and Testing

1. All Category 6, Category 3 (voice feeder) and coax cabling shall be tested utilizing a Fluke DTX 1800 or equivalent. All Fiber Optic cables shall be tested utilizing Fluke Networks OFP -100 or equivalent.

Test results shall be provided to City of Gilroy via unedited softcopy version of LinkWare.

2. Design -Build Entity shall provide 25 -year System Warranty.

END OF STRUCTURED CABLING SYSTEM SECTION

Page 128 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 29

Page 29 ends

011 SECURITY SYSTEMS
A. ACCESS CONTROL SYSTEM

1. Provide access control card readers at all exterior door s into the facility . Provide access control card readers and a localized mechanical pushbutton lock (basis of design: Simplex 5000 Series) at site pass gates.

B. SECURITY VIDEO SURVEILLANCE SYSTEM

1. Provide a security surveillance system and include all equipment for a complete and operable system, including the required servers, video recorder, cameras, camera accessories, camera mounting accessories, camera onboard storage (SD/micro -SD card, if applicable), applications/programs, licensing configurations/programming .

2. Provide (8) exterior secu rity video s urveillance cameras . Confirm all camera locations with City .

3. Cameras are IP -based with category 6A cabling.

END OF SECURITY SYSTEMS SECTION
012 AUDIO -VISUAL
A. GOALS AND PROJECT REQUIREMENTS

1. The purpose of the basis of design is to provide the proposed description of the Audio -Visual systems design, engineering, installation, and start -up for a complete, fully operational Audio - Visual systems for the project addressing the design assumptions based on the following standards.

2. Technologies listed below are options for review and incorporated as required. a. Speakers in Day Room , with integral cabling to the monitor in the room. b. Speakers in Dining, with integral cabling to the monitor in the room. c. Speakers in Shared Office, with integral cabling to the monitor in the room. d. Speakers in Captain’s Office , with integral cabling to the monitor in the room.

B. APPLICABLE CODES AND STANDARDS GUIDELINES

1. California Electrical Code

2. INFOCOM - Avixa Audio – Visual Design Standards.

3. Accessibility requirements per California Building Codes – Chapter 11B Accessibility to Public Buildings, Public Accommodations, Commercial Building and Public Housing

END OF AUDIO -VISUAL SECTION
013 FIRE PROTECTION SYSTEMS
A. OVERVIEW
The fire protection systems shall be designed responding to the building plan diagrams and complying with the current version of NFPA 13, NFPA 14 and NFPA 24. This will be a design build process , and the scope will be addressed by the bidding Design-Build Entity and their subcontractors.

B. FIRE WATER SUPPLY
Sprinkler heads shall be as follows:

1. Sprinkler heads in suspended ceiling areas shall be pendent quick response sprinkler, white finish with adjustable semi -recessed white finish escutcheon . Head shall be in the center of the half ACP panel.

Page 129 of 256 ends

Basis of Design Narrative | City of Gilroy, Santa Teresa Fire Station | April 3, 2026 LPA Project No.: 33236 | Page 30

Page 30 ends

2. Sprinkler heads in gyp board or other non -suspended ceiling areas shall be quick response concealed pendent sprinkler with white or custom color cover plate to match adjacent ceiling surfaces as applicable. Sprinkler heads shall be installed align ed in each ceiling area.

3. Areas with no ceiling shall be provided with sprinkler coverage using brass finish upright quick response sprinklers.

END OF FIRE PROTECTION SYSTEMS SECTION
014 FIRE ALARM SYSTEMS
C. OVERVIEW
The building shall be equipped with a fire alarm system to notify occupants of smoke or fire detected in the building complying with NFPA 72 .

END OF FIRE ALARM SYSTEMS SECTION
015 FIRE STATION ALERTING SYSTEMS
A. OVERVIEW
The building shall be equipped with a fire station alerting system to notify the fire crew of emergency calls throughout.

1. The S tation Controller :
a. Locate t he controller in the MDF room and include a compatible amplifier and UPS for th is specific system.
b. Provide station controller expansion modules as required. c. Provide system to provide a signal to other Design -Build Entity provided systems including gas/fuel shut -off system , lighting control system .
d. Provide connection between controller’s line -level audio output and house audio amplifier , if applicable per owner AV requirements.
e. System shall send alerts to fire personnel ’s smartphones while off-site.

2. System components :
a. LED Message signs : Each side of each App Bay, entrances to App Bay s, Dining , Day Room, Kitchen, Shared Office, Captain’s Office, and Weight Room . b. Strobe Lights: Each side of each App Bay, Shared Crew Office, Weight Room, Workshop. c. Dorm Light: Each dorm room.
d. Speaker s, flush mount : Each occupied room .
e. Speakers, W eather-proof: App Bays, outside front and rear of App Bays and outdoor patio. f. System remote relay s: As required.

3. Design -Build Entity to provide the following for the complete system. a. Conduit
b. Back boxes
c. Cable trays .
d. Mounting fasteners .

END OF FIRE STATION ALERTING SYSTEMS SECTION

END OF DOCUMENT

Page 130 of 256 ends

20421.1 | 5329-184400 Exhibit C - 1

EXHIBIT C
Performance Bond No.

PERFORMANCE BOND
WHEREAS, the City of Gilroy ("City") has awarded [ insert name of DBE ] designated as the "Principal" herein, an agreement for the work described as follows:

WHEREAS, on or about , 20 , the Principal entered into a Design-Build Agreement with the City for the design and construction of the work of improvement, which Design-Build Agreement and all Agreement Documents set forth therein are incorporated herein and made a part hereof by this reference; and
WHEREAS, Principal is required to furnish a bond guaranteeing the faithful performance of its obligations under the Agreement Documents concurrently with delivery to City of the executed Design-Build Agreement.

NOW, THEREFORE, Principal and ("Surety"), a duly
admitted surety in the State of California, are held and firmly bound to City for payment of the penal sum of $ ("the Bonded Sum"), in lawful money of the United States, for payment of which sum Principal and Surety jointly and severally bind themselves and their heirs, executors, administrators, successors and assigns.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT its Principal shall promptly and faithfully perform all of its obligations under the Agreement Documents, including any and all amendments and supplements thereto, then this obligation shall be null and void; otherwise it shall remain in full force and effect.

The following terms and conditions shall apply with respect to this Bond:

1. The DBE and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to City for the complete and proper performance of the Design-Build Agreement, which is incorporated herein by reference.

2. If the DBE completely and properly performs all of its obligations under the Design-Build Agreement, the Surety and the DBE shall have no obligation under this Bond.

3. If there is no City Default, the Surety's obligation under this Bond shall arise after:

3.1 City has declared a DBE Default under the Design-Build Agreement pursuant to the terms of the Design-Build Agreement; and

3.2 City has agreed to pay the Balance of the Agreement Sum to:

Page 131 of 256 ends

20421.1 | 5329-184400 Exhibit C - 2

3.2.1 The Surety in accordance with the terms of this Bond and the Design-Build Agreement; or

3.2.2 The contractor selected to perform the Design-Build Agreement in accordance with the terms of this Bond and the Design-Build Agreement.

4. When City has satisfied the conditions of Paragraph 3, the Surety shall promptly (within thirty (30) days) and at the Surety's expense elect to take one of the following actions (provided, that unless and until City has actually terminated DBE for default, the Surety need only respond to City and commence a diligent investigation, not make an election):

4.1 Arrange for the DBE, with consent of City, to perform and complete the DesignBuild Agreement (but City may withhold consent, in which case the Surety must elect an option described in Paragraphs 4.2, 4.3 or 4.4, below); or

4.2 Undertake to perform and complete the Design-Build Agreement itself, through its agents or through independent contractors, but City may reject use of the DBE as an agent or independent contractor; or

4.3 Obtain bids from qualified Design-Builders (DBEs) acceptable to City for a contract for performance and completion of the Design-Build Agreement (other than the original DBE), and, upon determination by City of the lowest responsible bidder, arrange for a contract to be prepared for execution by City and the DBE selected with City's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the DesignBuild Agreement; and, if the Surety's obligations defined in Paragraph 6, below, exceed the Balance of the Contract Sum, then the Surety shall pay to City the amount of such excess; or

4.4 Waive its right to perform and complete, arrange for completion, or obtain a new DBE and with reasonable promptness under the circumstances, and, after investigation and consultation with City, determine in good faith its monetary obligation for which it may then be liable to City under Paragraph 6, below, for the performance and completion of the Design-Build Agreement and, as soon as practicable after the amount is determined, tender payment therefor to City with full explanation of the payment's calculation. If City accepts the Surety's tender under this Paragraph 4.4, City may still hold Surety liable for future damages then unknown or unliquidated resulting from the DBE Default. If City disputes the amount of Surety's tender under this Paragraph 4.4, City may exercise all remedies available to it at law to enforce the Surety's liability under Paragraph 6 below.

5. If the Surety does not proceed as provided in Paragraph 4, above, then the Surety shall be deemed to be in default on this Bond ten (10) days after receipt of an additional written notice from City to the Surety demanding that the Surety perform its obligations under this Bond. At all times City shall be entitled to enforce any remedy available to City at law or under the Design-Build Agreement including, without limitation, and by way of example only, rightsto perform work, protect work, mitigate damages, or coordinate work with other consultants or DBEs.

Page 132 of 256 ends

20421.1 | 5329-184400 Exhibit C - 3

6. The Surety's monetary obligation under this Bond is limited to the amount of this Bond, plus the Balance of the Contract Sum paid hereunder. Subject to these limits, the Surety's obligations under this Bond are commensurate with the obligations of the DBE under the Design-Build Contract. The Surety's obligations shall include, but are not limited to:

6.1 The responsibilities of the DBE under the Design-Build Agreement for completion of the Design-Build Agreement and correction of defective work;

6.2 The responsibilities of the DBE under the Design-Build Agreement to pay liquidated damages, and for damages for which no liquidated damages are specified in the Design-Build Agreement, actual damages caused by non-performance of the Design-Build Agreement, including but not limited to, all valid and proper backcharges, offsets, payments, indemnities, or other damages;

6.3 Additional legal, design professional and delay costs resulting from the DBE Default or resulting from the actions or failure to act of the Surety under Paragraph 4, above.

7. No right of action shall accrue on this Bond to any person or entity other than City or its heirs, executors, administrators, or successors.

8. The Surety hereby waives notice of any change, alteration or addition to the Design-Build Agreement or to related subcontracts, purchase orders and other obligations, including changes of time. The Surety consentsto all terms of the Design-Build Agreement, including provisions on changes to the Agreement. No extension of time, change, alteration, modification, deletion, or addition to the Agreement Documents, or of the work required thereunder, shall release or exonerate Surety on this Bond or in any way affect the obligations of Surety on this Bond.

9. Any proceeding, legal or equitable, under this Bond shall be instituted in any court of competent jurisdiction where a proceeding is pending between City and the DBE regarding the Design-Build Agreement, or in the courts of the County of Santa Clara.

10. Notice to the Surety, City or the DBE shall be mailed or delivered to the address shown on the signature page.

11. Any provision in this Bond conflicting with any statutory or regulatory requirementshall be deemed deleted herefrom and provisions conforming to such statutory requirement shall be deemed incorporated herein.

12. Definitions.

12.1 Balance of the Contract Sum: The total amount payable by City to the DBE pursuant to the terms of the Design-Build Agreement after all proper adjustments have been made under the Design-Build Agreement, for example, deductions for progress payments made, and increases/decreases for approved modifications to the DesignBuild Agreement.

Page 133 of 256 ends

20421.1 | 5329-184400 Exhibit C - 4

12.2 Design-Build Agreement: The agreement between City and the DBE identified on the signature page, including all Agreement Documents and changes thereto.

12.3 DBE Default: Material failure of the DBE, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Design-Build Agreement

12.4 City Default: Material failure of City, which has neither been remedied nor waived, to pay the DBE progress payments due under the Design-Build Agreement or to perform other material terms of the Design-Build Agreement, if such failure is the cause of the asserted DBE Default and issufficient to justify DBE termination of the Design-Build Agreement.

13. Qualification Regarding Extended Warranties. The Surety’s liability for extended warranties for Subcontractors and suppliers shall not apply to a breach of any such extended warranty under the Design-Build Agreement that occurs more than one year after the applicable warranty commencement date under the Design-Build Agreement.

IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety of the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Principal and Surety have caused this Bond to be duly executed and delivered as of this day of , 20 .

SURETY: PRINCIPAL:

Name Name
Principal Place of Business Address
By: By:

Signature Signature
Attorney-In-Fact Printed Name
Signature Title

Page 134 of 256 ends

20421.1 | 5329-184400 Exhibit C - 5
(Attach Attorney-in-Fact Certificate, Corporate Seal and Surety Seal)

END OF DOCUMENT

Page 135 of 256 ends

20421.1 | 5329-184400 Exhibit D - 6

EXHIBIT D
Payment Bond No.

PAYMENT BOND
(Labor and Material Bond)
WHEREAS, the City of Gilroy ("City") has awarded [ insert name of DBE ] designated as the "Principal" herein, an agreement for the work described as follows:

WHEREAS, on or about , 20 , the Principal entered into a Design-Build Agreement with the City for the design and construction of the work of improvement, which Design-Build Agreement and all Agreement Documents set forth therein are incorporated herein and made a part hereof by this reference; and
WHEREAS, by terms of the Design-Build Agreement, as well as California Civil Code §9550, Principal is required to furnish a bond guaranteeing payment of claims.

NOW, THEREFORE, Principal and ("Surety"), a duly
admitted surety in the State of California, are held and firmly bound to the City for payment of the penal sum of $ ("the Bonded Sum"), in lawful money of the United States, for payment of which sum Principal and Surety jointly and severally bind themselves and their heirs, executors, administrators, successors and assigns.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT if Principal shall fail to pay any of the persons named in California Civil Code §9100 for all labor, materials, equipment or services used or reasonably required for use in performance of the Work of the Project, then Surety shall pay for the same in an amount not-to-exceed the Bonded Sum, otherwise this obligation shall be null and void.

The following terms and conditions shall apply with respect to this Bond:

1. The DBE and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to City and to Claimants, to pay for labor, materials and equipment furnished for use in the performance of the Design-Build Agreement, which is incorporated herein by reference.

2. With respect to City, this obligation shall be null and void if the DBE:

2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and

2.2 Defends, indemnifies and holds harmless City from all claims, demands, liens or suits by any person or entity who furnished labor, materials or equipment for use in the performance of the Design-Build Agreement, provided City has promptly

Page 136 of 256 ends

20421.1 | 5329-184400 Exhibit D - 7
notified the DBE and the Surety (at the address described in Paragraph 10) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the DBE and the Surety, and provided there is no City Default.

3. With respect to Claimants, this obligation shall be null and void if the DBE promptly makes payment, directly or indirectly through its subcontractors, for all sums due Claimants.

However, if DBE or its subcontractors fail to pay any of the persons named in California Civil Code section 9100, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Agreement, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of DBE or subcontractors pursuant to the Unemployment Insurance Code section 13020, with respect to such work and labor, then Surety will pay for the same, and also, in case suit is brought upon this bond, a reasonable attorney's fee, to be fixed by the Court.

4. Consistent with the California Mechanic's Lien Law, California Civil Code §§ 8000, etseq., the Surety shall have no obligation to Claimants under this Bond unless the Claimant has satisfied all applicable notice requirements.

5. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety under this Bond.

6. Amounts due the DBE under the Design-Build Agreement shall be applied first to satisfy claims, if any, under any Construction Performance Bond and second, to satisfy obligations of the DBE and the Surety under this Bond.

7. City shall not be liable for payment of any costs, expenses, or attorney's fees of any Claimant under this bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond.

8. The Surety hereby waives notice of any change, including changes of time, to the DesignBuild Agreement or to related subcontracts, purchase orders and other obligations.

9. Suit against Surety on this Payment Bond may be brought by any Claimant, or its assigns, at any time after the Claimant has furnished the last of the labor or materials, or both, but, pursuant to California Civil Code §9558, must be commenced before the expiration of six months after the period in which stop notices may be filed as provided in Civil Code §9356.

10. Notice to the Surety, City or the DBE shall be mailed or delivered to the address shown on the signature page. Actual receipt of notice by Surety, City or the DBE, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page.

11. This Bond has been furnished to comply with the California Mechanic's Lien Law, including, but not limited to, Civil Code §§9550, et seq. Any provision in this Bond conflicting with said statutory requirements shall be deemed deleted and provisions conforming to such statutory or other legal requirements shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond.

Page 137 of 256 ends

20421.1 | 5329-184400 Exhibit D - 8

12. Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the DBE shall promptly furnish a copy of this Bond or shall permit a copy to be made.

13. DEFINITIONS

13.1 Claimant: An individual or entity having a direct contract with this DBE or with a subcontractor of the DBE to furnish labor, materials or equipment for use in the performance of the Contract, as further defined in California Civil Code §9100.

The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Design-Build Agreement, architectural and engineering services required for performance of the work of the DBE and the DBE’s subcontractors, and all other items for which a stop notice might be asserted. The term Claimant shall also include the Unemployment Development Department as referred to in California Civil Code §9554(b).

13.2 Design-Build Contract: The agreement between City and the DBE identified on the signature page, including all Contract Documents and changes thereto.

13.3 City Default: Material failure of City, which has neither been remedied nor waived, to pay the DBE as required by the Design-Build Agreement, provided that failure is the cause of the failure of DBE to pay the Claimants and is sufficient to justify termination of the Design-Build Agreement.

IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety of the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Principal and Surety have caused this Bond to be duly executed and delivered as of this day of , 20 .

SURETY: PRINCIPAL:

Name Name
Principal Place of Business Address
By: By:

Signature Signature
Attorney-In-Fact Printed Name
Signature Title

Page 138 of 256 ends

20421.1 | 5329-184400 Exhibit D - 9
(Attach Attorney-in-Fact Certificate, Corporate Seal and Surety Seal)

END OF DOCUMENT

Page 139 of 256 ends

20421.1 | 5329-184400 Exhibit E - 1

EXHIBIT E

DBE'S PROJECT REPRESENTATION AND

KEY PERSONNEL

Page 140 of 256 ends

20421.1 | 5329-184400 Exhibit F - 1

EXHIBIT F

SUBMITTAL SCHEDULE

Page 141 of 256 ends

408-780-7200 Office
60 South Market Street, Suite 1250
San Jose, California 95113

NOT FOR REGULATORY APPROVAL,

PERMITTING OR CONSTRUCTION

ARCHITECTURE ENGINEERING INTERIORS

LANDSCAPE ARCHITECTURE PLANNING
LPADesignStudios.com

PROJECT NUMBER
Submittal Date
70% SCHEMATIC DESIGN 03/10/2026
100% SD / BRIDGING DOCS 03/26/2026
33236

SANTA TERESA FIRE STATION
1330 WEST LUCHESSA AVENUE
GILROY, CA 95020
G0.00

COVER SHEET

Page 142 of 256 ends

11B-201.4 CONSTRUCTION SUPPORT FACILITIES. These requirements shall apply to temporary or permanent construction support facilities for uses and activities not directly associated with the actual processes of construction, including but not limited to offices, meeting rooms, plan rooms, other administrative or support functions. When provided, toilet and bathing facilities serving construction support facilities shall comply with 11B-213. When toilet and bathing facilities serving construction support facilities are provided by portable units, at least one of each type shall be accessible and connected to the construction support facilities it serves by an accessible route.

EXCEPTION: During construction an accessible route shall not be required between site arrival points or the boundary of the area of construction and the entrance to the construction support facilities if the only means of access between them is a vehicular way not providing pedestrian access.

TEL: 408/846-0277

PUBLIC WORKS, PROJECT MANAGER
NAME: CITY OF GILROY

CLIENT INFORMATION
CITY,STATE, ZIP: GILROY, CA 95020
ADDRESS: 7351 ROSANNA STREET
CONTACT: RYAN OSENTON E-MAIL: [email protected] TEL: 408/780-7200
NAME: LPA, INC.

ARCHITECT
CITY,STATE, ZIP: SAN JOSE, CA 95113
ADDRESS: 60 S MARKET ST #1250
CONTACT: CHARLIE WILLIAMS E-MAIL: [email protected] TEL: 916/287-2400
NAME: LPA, INC.

LANDSCAPE ARCHITECT
CITY,STATE, ZIP: SACRAMENTO, CA 95814
ADDRESS: 431 I ST #107
CONTACT: RITA FRINK E-MAIL: [email protected] TEL: 949/261-1001
NAME: LPA, INC.

CIVIL ENGINEER
CITY,STATE, ZIP: IRVINE, CA 92617
ADDRESS: 5301 CALIFORNIA AVE, SUITE 100
CONTACT: ANTHONY TSUI E-MAIL: [email protected] TEL: 925/371-5900
NAME: GEOCON CONSULTANTS, INC.

GEOTECHNICAL ENGINEER
CITY,STATE, ZIP: LIVERMORE, CA 94550
ADDRESS: 6671 BRISA STREET
CONTACT: ADAM KNOX E-MAIL: [email protected]
TEL: 949/261-1001
NAME: LPA, INC.

STRUCTURAL ENGINEER
CITY,STATE, ZIP: IRVINE, CA 92617
ADDRESS: 5301 CALIFORNIA AVE, SUITE 100
CONTACT: JOHN WILSON E-MAIL: [email protected] TEL: 949/261-1001
NAME: LPA, INC.

MECHANICAL ENGINEER
CITY,STATE, ZIP: IRVINE, CA 92617
ADDRESS: 5301 CALIFORNIA AVE, SUITE 100
CONTACT: KRISTY NELSON E-MAIL: [email protected] TEL: 949/261-1001
NAME: LPA, INC.

ELECTRICAL ENGINEER
CITY,STATE, ZIP: IRVINE, CA 92617
ADDRESS: 5301 CALIFORNIA AVE, SUITE 100
CONTACT: FRANK TRAN E-MAIL: [email protected]
TEL: 949/261-1001
NAME: LPA, INC.

PLUMBING ENGINEER
CITY,STATE, ZIP: IRVINE, CA 92617
ADDRESS: 5301 CALIFORNIA AVE, SUITE 100
CONTACT: JARED PLUMMER E-MAIL: [email protected] TEL: 949/497-9000
NAME: GRIFFIN STRUCTURES, INC.

CONSTRUCTION MANAGER
CITY,STATE, ZIP: IRVINE, CA 92618
ADDRESS: 1 TECHNOLOGY, BUILDING I, SUITE 829
CONTACT: DUSTIN ALAMO E-MAIL: [email protected] ADDRESS:
1330 WEST LUCHESSA AVENUE
GILROY, CA 95020
APN: 808-58-004
P
N
ROJECT
ORTH
N
THE PROJECT CONSISTS OF A NEW 6,500-7,000 SQUARE FOOT ONE-STORY FIRE

STATION BUILDING WHICH INCLUDES TWO FIRE TRUCK BAYS, ADMINISTRATIVE

OFFICES, INDIVIDUAL DORMITORY ROOMS, KITCHEN, SHARED LIVING AREA, FITNESS AND SUPPORT SPACES ON AN APPROXIMATELY 1.36 ACRE SITE AT THE

SOUTHEASTERN CORNER OF WEST LUCHESSA AVENUE AND MILLER AVENUE IN GILROY, CA. SITE IMPROVEMENTS INCLUDE SECURED STAFF PARKING, PUBLIC/

VISITOR PARKING, AN EMERGENCY GENERATOR, A TRASH ENCLOSURE, PERIMETER WALL, AND VEHICULAR GATES.

THE INTENT OF THE LIMIT OF WORK LINE IS TO DESCRIBE IN GENERAL THE AREAS AFFECTED BY PROJECT CONSTRUCTION. IT IS NOT INTENDED TO BE AN EXACT INDICATION OR EDGE OF THE CONSTRUCTION AREA. THE DBE SHOULD

VISIT THE SITE & BECOME FAMILIAR W/ EXG CONDITIONS & THEIR RELATIONSHIP TO THE WORK PROPOSED IN THE CONTRACT DOCUMENTS. ALL ITEMS

NECESSARY FOR THE PROPER EXECUTION & COMPLETION OF THE WORK SHALL BE INCLUDED. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY &

WHAT IS REQ BY ONE SHALL BE BINDING AS IF REQ BY ALL TO THE EXTENT

THAT IT IS REASONABLY INFERABLE FROM THEM AS BEING NECESSARY TO PRODUCE THE INTENDED RESULTS.

THESE BRIDGING DOCUMENTS ESTABLISH THE BASIS OF DESIGN FOR THE PROJECT. ITEMS SHOWN, DEPICTED, DESCRIBED, SUGGESTED, IMPLIED,

REFERENCED, OR OTHERWISE CONVEYED IN ANY MANNER WITHIN THESE DOCUMENTS SHALL BE INCORPORATED INTO THE DESIGN-BUILD ENTITY’S (DBE)

FINAL DESIGN, ENGINEERING, AND CONSTRUCTION WITHOUT ADDITIONAL COST TO THE CITY. THE DBE SHALL RESOLVE ALL DISCREPANCIES, OMISSIONS,

SCHEMATIC DETAILS, OR CONFLICTS IN A MANNER CONSISTENT WITH THE OWNER’S PROGRAM, SPATIAL, AND FUNCTIONAL INTENT, WHETHER EXPRESSLY SHOWN OR IMPLIED IN THE BRIDGING DOCUMENTS. AT NO POINT SHALL THE DBE’S FINAL DESIGN OMIT, REDUCE, SUBSTITUTE, OR ALTER ANY SPACE,

FURNISHING, SYSTEM, FEATURE, OR ELEMENT DEPICTED, DESCRIBED,

REFERENCED, OR OTHERWISE CONVEYED IN THE BRIDGING DOCUMENTS,

EXCEPT WITH THE PRIOR WRITTEN APPROVAL OF THE CITY ENGINEER SPECIFIC

TO SAID ITEM, AND SUCH APPROVAL SHALL NOT CONSTITUTE GROUNDS FOR

ADDITIONAL COMPENSATION OR TIME UNLESS EXPRESSLY AUTHORIZED IN WRITING BY THE CITY. WHERE DISCREPANCIES EXIST AMONG THE BRIDGING

DOCUMENTS, THE DBE SHALL ASSUME AND CARRY THE MOST STRINGENT AND

COMPREHENSIVE INTERPRETATION OF THE REQUIREMENT AND SHALL NOT

HAVE GROUNDS TO REQUEST ADDITIONAL COMPENSATION OR TIME FOR DOING SO. THE DBE SHALL NOT RELY UPON THE PRELIMINARY NATURE OF THESE DOCUMENTS TO ASSERT CLAIMS FOR ADDITIONAL COMPENSATION OR TIME.

THE DBE IS SOLELY RESPONSIBLE FOR ENSURING THAT THE FINAL DESIGN IS

FULLY COMPLIANT WITH ALL APPLICABLE CODES AND REQUIREMENTS OF

AUTHORITIES HAVING JURISDICTION, CONSTRUCTIBLE, COORDINATED ACROSS ALL DISCIPLINES, AND CONSISTENT WITH THE OWNER’S PROGRAM INTENT.

UTILITY LAYOUTS DEPICTED IN THE BRIDGING DOCUMENTS ARE DIAGRAMMATIC ONLY. THE DBE IS FULLY RESPONSIBLE FOR FINALIZING THE DESIGN,

ENGINEERING, AND COORDINATION OF ALL UTILITY SERVICES DIRECTLY WITH

THE PROVIDER, INCLUDING SUBMITTING COMPLETE APPLICATIONS AND

SECURING APPROVALS AND PERMITS FROM THE SERVING UTILITIES AND AUTHORITIES HAVING JURISDICTION (PERMIT FEES TO BE PAID BY THE CITY).

THE DBE SHALL ENSURE THAT ALL UTILITY SERVICES ARE DESIGNED,

COORDINATED, AND INSTALLED IN A MANNER THAT MEETS THE PROJECT SCHEDULE AND SUPPORTS TIMELY OCCUPANCY.IN THE EVENT OF CONFLICTS

BETWEEN THESE DOCUMENTS, THE INTERPRETATION MOST CONSISTENT WITH THE OWNER’S PROGRAM INTENT SHALL GOVERN. THE DBE SHALL PROVIDE ALL

DESIGN, LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND SYSTEMS

REQUIRED TO FURNISH AND INSTALL THE PROJECT CONSISTENT WITH THESE REQUIREMENTS. NO OMISSION OR AMBIGUITY IN THE BRIDGING DOCUMENTS

SHALL RELIEVE THE DBE OF ITS OBLIGATION TO DELIVER A COMPLETE, FULLY FUNCTIONING, AND CODE-COMPLIANT FACILITY. FOR PURPOSES OF THIS DISCLAIMER, “BRIDGING DOCUMENTS” MEANS ALL PLANS, SPECIFICATIONS,

BASIS OF DESIGN NARRATIVES, REPORTS, AND EXHIBITS ISSUED BY THE OWNER AS PART OF THE PROCUREMENT PACKAGE.

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CER CERAMIC

CI CAST IRON

CIP CAST IN PLACE

CIV ENG CIVIL ENGINEER

CG CORNER GUARD

CJ CONTROL JOINT

CLG CEILING

CLKG CAULKING

CLO CLOSET

CLR CLEAR

CNTR COUNTER

CO CASED OPENING

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONSTR CONSTRUCTION

CONT CONTINUOUS

CORR CORRIDOR

CT CERAMIC TILE

CTR CENTER

CTSK COUNTERSUNK

DA DISABLED ACCESS

DBE DESIGN-BUILD ENTITY

DBL DOUBLE
DEPT. DEPARTMENT

DESC DESCRIPTION

DF DRINKING FOUNTAIN

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DR DOOR

DWR DRAWER

DS DOWNSPOUT

DSP DRY STANDPIPE

DWG DRAWING
E EAST

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

EP ELECTRICAL PANELBOARD

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXPO EXPOSED

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FB FLAT BAR

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLASH FLASHING

FLUOR FLUORESCENT

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD

FOV FACE OF VENEER (BRICK OR

PRECAST)

FOW FACE OF WALL

FR FIRE RETARDANT

FPRF FIREPROOF

FS FINISH SURFACE

FT FOOT OR FEET

FTG FOOTING

FURR FURRING

FUT FUTURE

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GI GALVANIZED IRON

GL GLASS

GND GROUND

GR GRADE

GYP GYPSUM

HB HOSE BIB

HC HOLLOW CORE

HDWD HARDWOOD

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HGT/HT HEIGHT

ID INSIDE DIAMETER

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

KIT KITCHEN

LAB LABORATORY

LAM LAMINATE

LAND ARCH LANDSCAPE ARCHITECT

LAV LAVATORY

LKR LOCKER

LT LIGHT

MATL MATERIAL

MAX MAXIMUM

MC MEDICINE CABINET

MECH MECHANICAL

MEMB MEMBRANE

MET METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MTD MOUNTED

MUL MULLION

N NORTH

NIC NOT IN CONTRACT
NO/# NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OA OUTSIDE AIR

OBS OBSCURE

OC ON CENTER

OD OUTSIDE DIAMETER

OFF OFFICE

OPNG OPENING

OPP OPPOSITE

OSA OUTSIDE AIR

PA PLANTING AREA

PRCST PRECAST

PH PANIC HARDWARE

PL PLATE

P LAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

POT PATH OF TRAVEL

PR PAIR

PT PAINT

PTD PAPER TOWEL

DISPENSER

PTD/R COMBINATION PAPER

TOWEL DISPENSER
& RECEPTACLE

PTN PARTITION

PTR PAPER TOWEL

RECEPTACLE

QT QUARRY TILE

R RISER

RAD RADIUS

RD ROOF DRAIN

REF REFERENCE

REFR REFRIGERATOR

RGTR REGISTER

REINF REINFORCED

REQD REQUIRED

RESIL RESILIENT

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RWD REDWOOD

RWL RAIN WATER LEADER

S SOUTH

SC SOLID CORE

SCD SEAT COVER

DISPENSER

SCHED SCHEDULE

SD SOAP DISPENSER

SECT SECTION

SF SQUARE FEET

SH SHELF

SHR SHOWER

SHT SHEET

SIM SIMILAR

SND SANITARY NAPKIN

DISPENSER

SNR SANITARY NAPKIN

RECEPTACLE

SPEC SPECIFICATION(S)

SQ SQUARE

SS STAINLESS STEEL

S SK SERVICE SINK

STA STATION

STD STANDARD

STL STEEL

STOR STORAGE

STR STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

T TREAD

TB TOWEL BAR

TC TOP OF CURB

TEL TELEPHONE

TER TERRAZZO

T&G TONGUE & GROOVE

THK THICK

TOB TOP OF BEAM

TOC TOP OF CONCRETE

TOW TOP OF WALL

TOP TOP OF PARAPET

TPD TOILET PAPER

DISPENSER

TS TOP OF SLOPE

TV TELEVISION

TYP TYPICAL

UNF UNFINISHED

UNO UNLESS NOTED

OTHERWISE

UR URINAL

VCT VINYL COMPOSITION
TILE

VERT VERTICAL

VEST VESTIBULE
W WEST

W/ WITH

WC WATER CLOSET

WD WOOD

W/O WITHOUT

WP WATERPROOF

WR WATER RESISTANT

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC
& AND
∠ ANGLE
@ AT
℄ CENTERLINE
∅ DIAMETER OR ROUND
# POUND OR NUMBER
(E) EXISTING
(P) PAINT
(R) REMOVE
+/- DIM TOLERANCE

AC ASPHALTIC CONCRETE

ACC ACCESSIBLE

ACOUS ACOUSTICAL

ACM ALUM COMPOSITE MATERIAL

ACT ACOUS CLG TILE

AD AREA DRAIN

AED AUTO EXT DEFIBRILLATOR

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

AGGR AGGREGATE

AHJ AUTHORITY HAVING

JURISDICTION

ALUM ALUMINUM

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ASF ASSIGNABLE SF

ASPH ASPHALT

BD BOARD

BITUM BITUMINOUS

BLDG BUILDING

BLK BLOCK

BLK'G BLOCKING

BM BEAM

BOC BACK OF CURB

BOT BOTTOM

BO BOTTOM OF

BOC BACK OF CURB

BOW BOTTOM OF WALL

BS BOTTOM OF SLOPE

COLUMN LINES
0 0

SURFACE DRAINAGE

ARROW INDICATES

DIRECTION OF FLOW
N

PROJECT NORTH

BUILDING SECTION

SECTION ID

SHEET NUMBER

WALL SECTION

SECTION ID

SHEET NUMBER

DETAIL CALLOUTS

DETAIL ID

SHEET NUMBER

DETAIL SECTION

DETAIL ID

SHEET NUMBER

DETAIL REFERENCE

DETAIL ID

SHEET NUMBER

INTERIOR ELEVATIONS

DETAIL ID

SHEET NUMBER
A
C
SIM
D A101 B

DOOR DESIGNATION

ROOM DESIGNATION

ROOM NUMBER

ROOM AREA
REVISION CLOUD & 1

TAG (OPTIONAL)
SA2U
1t

SHADED PORTION POINTS

TO SIDE REFERENCED

DATUM POINT

KEYNOTE

WALL TYPE

OPENING DESIGNATION
TYP.
?

MATCH LINE
SEE SHEET A101

LEVEL LINE, CONTROL POINT
EL: 12'-8" = ELEVATION/SECTION

STAIR DIRECTION
DN
UP

CENTER LINES, LEVEL LINES

HIDDEN CONSTRUCTION FEATURE

BREAK LINE
####
FINISH TAG XX-##
EQUIPMENT TAG 1i
N

TRUE NORTH

NORTH ARROW

EXTERIOR ASSEMBLY
REFER TO A8.11 R1
Room
101
150 SF
1 A101
TYP
1 A101
TYP
1 A101
SIM
1 A101
SIM
1 A101
SIM

LIST OF APPLICABLE CODES
2025 CALIFORNIA ADMINISTRATIVE CODE (CAC), PART 1, TITLE 24 CCR 2025 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 CCR 2025 CALIFORNIA RESIDENTIAL CODE (CBC), PART 2.5, TITLE 24 CCR 2025 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 CCR 2025 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 CCR 2025 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 CCR 2025 CALIFORNIA ENERGY CODE, PART 6, TITLE 24 CCR
2025 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 CCR
2025 CALIFORNIA EXISTING BUILDING CODE (CEBC), PART 10, TITLE 24 CCR 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE (CAL GREEN), PART 11, TITLE 24 CCR
2025 CALIFORNIA REFERENCED STANDARDS CODE, PART 12, TITLE 24 CCR TITLE 19 CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS

APPLICABLE STANDARDS

FOR A LIST OF APPLICABLE STANDARDS, INCLUDING CALIFORNIA AMENDMENTS TO THE NFPA STANDARDS, REFER TO CBC CHAPTER 35 AND CFC CHAPTER 80.

1. PLANS FOR THE FIRE SPRINKLER SYSTEMS MUST BE APPROVED BY THE AUTHORITY HAVING JURISDICTION (AHJ) PRIOR TO INSTALLATION. SUBMIT

PLANS IN A MANNER WHICH WILL NOT IMPEDE THE PROGRESS OF CONSTRUCTION.

2. FIRE SPRINKLER SYSTEMS & INSTALLATION SHALL CONFORM W/ THE APPLICABLE STANDARDS AND CODES.

3. FIRE SPRINKLER SYSTEMS TO BE TIED INTO THE ALARM SYSTEM PER THE APPLICABLE CODES.

4. AUTOMATIC SPRINKLER SYSTEM(S) SHALL BE SUPERVISED BY AN APPROVED

CENTRAL OR REMOTE STATION SERVICE, AND/OR SHALL BE PROVIDED W/ A LOCAL ALARM WHICH WILL GIVE AN AUDIBLE SIGNAL.

5. FIRE SPRINKLER SYSTEM(S) & ALL CONTROL VALVES SHALL BE SUPERVISED BY A U.L. LISTED CENTRAL ALARM STATION OR PER THE APPLICABLE CODES.

6. FIRE HYDRANT & FIRE SPRINKLER SYSTEM(S) SHALL BE FLUSHED

THOROUGHLY BEFORE CONNECTION IS MADE TO EXISTING SYSTEM STUBOUTS & WITNESSED BY THE PROJECT INSPECTOR.

7. A HYDROSTATIC TEST (200 PSI PRESSURE FOR 2 HRS. OR @ 50 PSI IN EXCESS OF THE MIN. STATIC PRESSURE WHEN IT IS IN EXCESS OF 150 PSI) SHALL BE

WITNESSED BY THE PROJECT INSPECTOR PRIOR TO COVERING PIPING JOINTS.

8. A 3' CLR SPACE SHALL BE MAINTAINED AROUND THE CIRCUMFERENCE OF FIRE

HYDRANTS EXCEPT AS OTHERWISE REQ OR APPROVED PER THE APPLICABLE CODES.

9. THRUST BLOCKS SHALL BE PROVIDED WHEREVER PIPE CHANGES DIRECTION.

10. ALL PIPE SHALL BE UL LISTED FOR FIRE SERVICE SYSTEMS, CLASS 200 MIN.

11. FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED W/I 100' FROM A PUBLIC FIRE HYDRANT PER THE APPLICABLE STANDARDS AND CODES.

12. FIRE SPRINKLER RISER SHALL BE LOCATED WITHIN 5 FT OF THE EXT WALL (OR AS REQ BY THE AHJ) AND TERMINATE 6" ABV FF

13. AN ALL-WEATHER FIRE ACCESS ROAD SHALL BE IN PLACE BEFORE ANY COMBUSTIBLE MATERIALS ARE PLACED ON THE SITE OR AS REQ BY THE AHJ.

14. STORAGE, DISPENSING, OR USE OF ANY FLAMMABLE & COMBUSTIBLE LIQUIDS,

FLAMMABLE & COMPRESSED GASES & OTHER HAZARDOUS MATERIALS SHALL COMPLY W/ THE APPLICABLE CODES.

15. EXIT SIGNS SHALL BE POSTED OVER EXIT DOORS & DIRECTIONAL EXIT SIGNS SHALL BE LOCATED TO DIRECT PERSONS TOWARD EXIT DOORS.

16. EXIT SIGNS SHALL BE SELF-LUMINOUS TYPE OR ELECTRONICALLY

ILLUMINATED & ENERGIZED FROM SEPARATE CIRCUITS, ONE OF WHICH SHALL

BE FROM STORAGE BATTERIES OR AN ON-SITE GENERATOR, FOR A DURATION OF 90 MINUTES PER THE APPLICABLE CODES.

17. EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT.

18. ACCESS GATE(S) SHALL BE OPENABLE W/ FIRE DEPT MASTER KEY FROM THE EXTERIOR.

19. CURBS ALONG FIRE LANES SHALL BE PAINTED SAFETY RED & MARKED "FIRE LANE NO PARKING" W/ 3" WHITE LETTERS ON THE TOP OF CURBING EVERY 30' AS INDICATED ON THE APPROVED DRAWINGS.

20. APPROVED NUMBERS OR ADDRESSES SHALL BE PROVIDED FOR ALL NEW &

EXG BLDGS IN SUCH A POSITION AS TO BE PLAINLY VISIBLE & LEGIBLE FROM

THE STREET OR ROAD FRONTING THE PROPERTY PER THE APPLICABLE CODES.

21. PROVIDE PERMANENT OR TEMPORARY STANDPIPES WHILE BUILDING IS UNDER CONSTRUCTION PER THE APPLICABLE CODES.

22. PROVIDE FIRE EXTINGUISHERS PER THE REQ THE APPLICABLE STANDARDS AND CODES.

1. ALL CONSTRUCTION & MATERIALS SHALL BE AS SPECIFIED & IN ACCORDANCE

WITH ALL APPLICABLE CODES, ORDINANCES, LAWS, PERMITS & THE CONTRACT DOCUMENTS.

2. THE DESIGN-BUILD ENTITY (DBE) SHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF ALL NEW CONSTRUCTION ON THE SITE.

3. THE DBE IS RESPONSIBLE FOR ALL EXG SURVEY MONUMENTS WHICH MAY BE

DISTURBED THROUGH CONSTRUCTION ACTIVITIES DEEMED NECESSARY FOR PRESERVATION BY THE CIVIL ENGINEER. IF SUCH MONUMENTS WERE

DISTURBED, THE APPLICANT SHALL HAVE A LICENSED LAND SURVEYOR

QUALIFIED CIVIL ENGINEER REESTABLISH ANY SUCH MONUMENTATION

DAMAGED OR DESTROYED DURING THE CONSTRUCTION OF THE PROJECT & SUBMIT "PRELIMINARY CORNER RECORDS" TO THE CIVIL ENGINEER AFTER REPLACEMENT. AFTER APPROVAL BY THE CIVIL ENGINEER, THE APPLICANT SHALL FILE THE CORNER RECORDS WITH THE COUNTY SURVEYOR. PRIOR TO

THE EXONERATION OF ANY SECURITY, EVIDENCE OF SUCH FILING SHALL BE FURNISHED TO THE CIVIL ENGINEER.

4. THE DBE IS RESPONSIBLE TO INSURE THAT TRUCK ROUTES SHALL BE STEERED AWAY FROM RESIDENTIAL AREAS.

5. THE DBE SHALL ENSURE THAT TRUCKS HAULING DIRT ON PUBLIC ROADS TO & FROM THE SITE SHALL BE COVERED OR WILL MAINTAIN A 6" DIFFERENTIAL

BETWEEN THE MAX HGT OF ANY HAULED MATERIAL & THE TOP OF THE HAUL TRAILER. HAUL TRUCK DRIVERS SHALL WATER THE LOAD PRIOR TO LEAVING THE SITE TO PREVENT SOIL LOSS DURING TRANSPORT.

6. THE DBE SHALL ENSURE THAT GRADED SURFACES USED FOR OFF ROAD

PARKING, MATERIALS LAY-DOWN, OR AWAITING FUTURE CONSTRUCTION SHALL BE STABILIZED FOR DUST CONTROL AS NEEDED. FREQUENTLY ACCESSED

UNPAVED AREAS SHALL BE PAVED AS EARLY AS POSSIBLE TO MINIMIZE DIRT TRACKOUT TO PUBLIC RIGHTS-OF-WAY.

7. THE CONSTRACTOR SHALL COORDINATE ANY LANE CLOSURES OR DETOURS WITH THE CITY/COUNTY. FLAG PERSONS & APPROPRIATE TRAFFIC CONTROL

DEVICES SHALL BE USED AS NEEDED TO MINIMIZE CONSTRUCTION ACTIVITY INTERFERENCE WITH OFF-SITE-TRAFFIC.

8. THE DBE SHALL VERIFY ALL DIMENSIONS & SITE CONDITIONS BEFORE STARTING WORK. SHOULD A DISCREPANCY APPEAR IN THE CONTRACT

DOCUMENTS OR BETWEEN THE CONTRACT DOCUMENTS & EXISTING

CONDITIONS, NOTIFY THE ARCHITECT AT ONCE FOR INSTRUCTION ON HOW TO PROCEED.

9. SHOULD A CONFLICT OCCUR BETWEEN DWGS & SPECIFICATIONS, THE MORE

COSTLY CONDITION SHALL TAKE PRECEDENCE, UNLESS A WRITTEN DECISION

FROM THE ARCHITECT HAS BEEN OBTAINED WHICH DESCRIBES A
CLARIFICATION OR ALTERNATE METHOD AND/OR MATERIALS.

10. THE DBE SHALL CONFINE HIS OPERATION ON THE SITE TO AREAS PERMITTED BY OWNER.

11. THE JOBSITE SHALL BE MAINTAINED IN A CLEAN, ORDERLY CONDITION FREE OF

DEBRIS & LITTER & SHALL NOT BE UNREASONABLY ENCUMBERED WITH ANY MATERIALS OR EQUIPMENT. EACH SUBDBE IMMEDIATELY UPON COMPLETION

OF EACH PHASE OF HIS WORK SHALL REMOVE ALL TRASH & DEBRIS AS A RESULT OF HIS OPERATION.

12. ALL MATERIAL STORED ON THE SITE SHALL BE PROPERLY STACKED & PROTECTED TO PREVENT DAMAGE & DETERIORATION. FAILURE TO PROTECT MATERIALS MAY BE CAUSE FOR REJECTION OF WORK.

13. THE DBE SHALL DO ALL CUTTING, FITTING, AND/OR PATCHING OF HIS WORK

THAT MAY BE REQ TO MAKE ITS SEVERAL PARTS FIT TOGETHER PROPERLY &

SHALL NOT ENDANGER ANY OTHER WORK BY CUTTING, EXCAVATING, OR OTHERWISE ALTERING THE TOTAL WORK OR ANY PART OF IT. ALL PATCHING,

REPAIRING AND REPLACING OF MATERIALS AND SURFACES, CUT OR DAMAGED

IN EXECUTION OF WORK, SHALL BE DONE WITH APPLICABLE MATERIALS SO

THAT SURFACES REPLACED WILL, UPON COMPLETION, MATCH SURROUNDING SIMILAR SURFACES.

14. STRUCTURAL OBSERVATION WILL BE PERFORMED BY THE STRUCTURAL ENGINEER. WHEN REQ, A STATEMENT IN WRITING SHALL BE GIVEN TO THE

BUILDING OFFICIAL, STATING THAT THE SITE VISITS HAVE BEEN MADE &

WHETHER OR NOT ANY OBSERVED DEFICIENCIES HAVE BEEN CORRECTED TO CONFORM TO THE APPROVED PLANS & SPECIFICATIONS.

15. SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITAL ITEMS SHALL BE

SUBMITTED TO THE ARCHITECT OR ENGINEER OF RECORD, WHO SHALL

REVIEW THEM & RETURN THEM TO THE DBE (WITH A NOTIFICATION INDICATING

THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED & THAT

THEY HAVE BEEN FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING) FOR PLAN CHECK APPROVAL. THE DEFERRED SUBMITTAL

ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN & SUBMITTAL

DOCUMENTS HAVE BEEN APPROVED BY THE AUTHORITY HAVING
JURISDICTION.

16. PROVIDE ALL ACCESS PANELS AS REQ BY GOVERNING CODES TO ALL CONCEALED SPACES, VOIDS, ATTICS, ETC. VERIFY TYPE REQ WITH ARCHITECT PRIOR TO INSTALLATION.

17. NO PORTION OF WORK REQ A SHOP DWG OR SAMPLE SUBMISSION SHALL BE COMMENCED UNTIL THE SUBMISSION HAS BEEN REVIEWED BY THE ARCHITECT.

ALL SUCH PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH CORRECTED SHOP DWGS. AND SAMPLES.

18. DIMENSIONS:

A. ALL DIMS SHALL TAKE PRECEDENCE OVER SCALE.

B. ALL DIMS ARE TO FACE OF STUD / CONCRETE / MASONRY UNO C. CLG HGT DIMS ARE FROM FACE OF SLAB TO FACE OF FIN CLG MATERIAL UNO

19. DO NOT SCALE DRAWINGS

20. PROVIDE ALL NECESSARY BLOCKING, BACKING, & FRAMING FOR LIGHT

FIXTURES, ELECTRIC UNITS, AC EQUIP, RECESSED ITEMS, AND ALL OTHER ITEMS AS REQ.

21. WHERE LARGER STUDS OR FURRING ARE REQ TO COVER PIPING AND

CONDUITS, THE LARGER STUD SIZE OR FURRING SHALL EXTEND THE FULL

SURFACE OF THE WALL WIDTH AND LENGTH WHERE THE FURRING OCCURS, UNO.

22. ALL DOORS SHALL BE OPERABLE FROM THE INSIDE W/O THE USE OF A KEY OR SPECIAL KNOWLEDGE OF EFFORT. EXIT SIGNS SHALL BE PROVIDED AT ALL EXITS AS REQ BY THE APPLICABLE CODES. ALL DOOR SWINGS SERVING AN OCCUPANT LOAD OF 50 OR GREATER SHALL SWING IN THE DIRECTION OF TRAVEL.

23. ALL GLASS AND GLAZING SHALL COMPLY WITH THE APPLICABLE CODES.

24. WALL AND CLG MATERIALS SHALL NOT EXCEED THE FLAME SPREAD CLASSIFICATIONS IN THE APPLICABLE CODES.

25. SURVEYORS CERTIFICATE REQ PRIOR TO FINAL COMPLETION.

26. THE DBE SHALL COMPLY WITH THE APPLICABLE CODES FOR FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION.

1. PROVIDE COMPLETE PHOTOVOLTAIC ARRAY SYSTEM OVER PARKING CANOPY.

SEE KEYNOTE 26.01 ON ARCHITECTUAL SITE PLAN, AND SEE KEYNOTE ON ELECTRICAL SITE PLAN.

2. EXTEND ELECTRICAL, DOMESTIC WATER, AND SEWER SYSTEM
INFRASTRUCTURE TO OPEN GREEN FEILD. SEE KEYNOTE ON CIVIL UTILITY PLAN, AND SEE KEYNOTE ON ELECTRICAL SITE PLAN.

Revision Date
408-780-7200 Office
60 South Market Street, Suite 1250
San Jose, California 95113

NOT FOR REGULATORY APPROVAL,

PERMITTING OR CONSTRUCTION

ARCHITECTURE ENGINEERING INTERIOR DESIGN

LANDSCAPE ARCHITECTURE PLANNING
LPADesignStudios.com
Developed for
Checked By
Scale
Job Number Submittal Date 70% SCHEMATIC DESIGN 03/10/2026 100% SD / BRIDGING DOCS 03/26/2026 This document and all other project documents, ideas,
aesthetics and designs incorporated therein are instruments of service. All project documents are copyright protected, are the property of LPA, Inc. (LPA) and cannot be lawfully used in whole or in part for any project or purpose except as set forth in the contractual agreement between LPA and its Client. The unauthorized disclosure and/or use of the
project documents (including the creation of derivative works), may give rise to liability for copyright infringement, unlawful disclosure, use or misappropriation of property rights held by LPA. The unauthorized use of the project documents will give rise to the recovery of monetary losses and damages including attorney fees and costs for which the unauthorized user will be held liable.

Project documents describe the design intent of the work and are not a representation of as-built or existing
conditions. LPA is not responsible for any discrepancies between the project documents and the existing conditions. © LPA, Inc.
1/8" = 1'-0"

SANTA TERESA FIRE STATION
1330 WEST LUCHESSA AVENUEGILROY, CA 95020
GRIFFIN STRUCTURES, INC.

GENERAL PROJECT

INFORMATION & SHEET
INDEX
G0.20
33236

MG / TP

ADA CONSTRUCTION SUPPORT FACILITIES

PROJECT DIRECTORY

PROJECT SCOPE VICINITY MAP

LIMIT OF WORK

BASIS OF DESIGN NOTE

SYMBOLS ABBREVIATIONS SHEET INDEX SHEET NUMBER

SHEET NAME

GENERAL
G0.00 COVER SHEET
G0.20 GENERAL PROJECT INFORMATION & SHEET INDEX
G0.40 CALGREEN 1
G0.41 CALGREEN 2
G0.42 CALGREEN 3
G0.43 CALGREEN 4
G1.01 SITE CODE & FIRE ACCESS PLAN
G2.01 CODE ANALYSIS & EGRESS PLAN
CIVIL
C0.01 CIVIL NOTES
C0.02 EXISTING CONDITIONS PLAN
C1.01 DEMOLITION PLAN
C2.01 CONCEPTUAL GRADING PLAN
C3.01 CONCEPTUAL STORM DRAIN PLAN
C4.01 CONCEPTUAL UTILITY PLAN

LANDSCAPE
L0.01 LANDSCAPE NOTES AND LEGENDS
L1.01 MATERIALS PLAN
L7.01 PLANTING PLAN

ARCHITECTURE
A0.21 SITE PLAN
A2.01 FLOOR PLAN
A2.02 ROOF PLAN
A2.21 FLOOR FINISHES PLAN
A2.31 REFLECTED CEILING PLAN
A2.41 EQUIPMENT/ FURNITURE PLAN
A3.01 EXTERIOR ELEVATIONS
A3.11 BUILDING SECTIONS

MECHANICAL
M0.01 MECHANICAL LEGENDS AND GENERAL NOTES
M5.01 MECHANICAL ZONING PLANS
M5.02 MECHANICAL ZONING PLANS

PLUMBING
P0.10 PLUMBING LEGENDS AND GENERAL NOTES
P1.00 PLUMBING SITE PLANS
P2.01 PLUMBING FLOOR PLAN
P2.02 PLUMBING ROOF PLAN
P4.01 PLUMBING ENLARGED PLANS
P6.00 PLUMBING SCHEDULES

ELECTRICAL
E0.01 ELECTRICAL LEGEND & GENERAL NOTES
E0.02 ELECTRICAL GENERAL NOTES
E0.21 ELECTRICAL SITE PLANS
E0.31 LIGHTING SITE PLAN
E2.01 ELECTRICAL POWER PLANS
E2.13 ELECTRICAL MECHANICAL POWER ROOF PLANS
E5.00 ELECTRICAL SINGLE LINE DIAGRAMS
TOTAL NUMBER OF SHEETS: 41

APPLICABLE CODES

CONSTRUCTION NOTES FIRE LIFE AND SAFETY NOTES

ALTERNATES

Page 143 of 256 ends
← All documents from this meeting