Cities Index.
Agenda packet

Grass Valley City Council
April 8, 2025

Document
Agenda packet
Meeting
April 8, 2025
Body
Grass Valley City Council
Pages
291
Original file
16.4 MB
Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

GRASS VALLEY
City Council Regular Meeting, Capital Improvements Authority and Redevelopment "Successor Agency"
Tuesday, April 08, 2025 at 6:00 PM
Council Chambers, Grass Valley City Hall | 125 East Main Street, Grass Valley, California Telephone: (530) 274-4310 – Fax: (530) 274-4399
E-Mail: [email protected] Web Site: www.cityofgrassvalley.com AGENDA
Any person with a disability who requires accommodations to participate in this meeting should telephone the City Clerk’s office at (530)274-4390, at least 48 hours prior to the meeting to make a request for a disability related modification or accommodation.

Mayor Hilary Hodge, Vice Mayor Haven Caravelli, Councilmember Jan Arbuckle, Councilmember Joe Bonomolo, Councilmember Tom Ivy

MEETING NOTICE
City Council welcomes you to attend the meetings electronically or in person at the City Hall Council Chambers, located at 125 E. Main St., Grass Valley, CA 95945. Regular Meetings are scheduled at 6:00 p.m. on the 2nd and 4th Tuesday of each month. Your interest is encouraged and appreciated.

This meeting is being broadcast “live” on Comcast Channel 17 & 18 by Nevada County Media, on the internet at www.cityofgrassvalley.com, or on the City of Grass Valley YouTube channel at https://www.youtube.com/@cityofgrassvalley.com Members of the public are encouraged to submit public comments via voicemail at (530) 274-4390 and email to [email protected]. Comments will be reviewed and distributed before the meeting if received by 5pm. Comments received after that will be addressed during the item and/or at the end of the meeting. Council will have the option to modify their action on items based on comments received. Action may be taken on any agenda item.

Agenda materials, staff reports, and background information related to regular agenda items are available on the City’s website: www.cityofgrassvalley.com. Materials related to an item on this agenda submitted to the Council after distribution of the agenda packet will be made available on the City of Grass Valley website at www.cityofgrassvalley.com, subject to City staff’s ability to post the documents before the meeting.

Please note, individuals who disrupt, disturb, impede, or render infeasible the orderly conduct of a meeting will receive one warning that, if they do not cease such behavior, they may be removed from the meeting. The chair has authority to order individuals removed if they do not cease their disruptive behavior following this warning. No warning is required before an individual is removed if that individual engages in a use of force or makes a true threat of force. (Gov. Code, § 54957.95.)

Page 1 ends

City of Grass Valley, CA AGENDA April 08, 2025
Council Chambers are wheelchair accessible and listening devices are available. Other special accommodations may be requested to the City Clerk 72 hours in advance of the meeting by calling (530) 274-4390, we are happy to accommodate.

CALL TO ORDER

PLEDGE OF ALLEGIANCE

ROLL CALL
AGENDA APPROVAL - The City Council reserves the right to hear items in a different order to accomplish business in the most efficient manner.

REPORT OUT OF CLOSED SESSION

INTRODUCTIONS AND PRESENTATIONS

1. Arts, Culture & Creativity Month Proclamation

CITY STAFF UPDATE

2. Fire Department Update
PUBLIC COMMENT - Members of the public are encouraged to submit public comments via voicemail at (530) 274-4390 and email to [email protected]. Comments will be reviewed and distributed before the meeting if received by 5pm. Comments received after 5pm will be addressed during the item and/or at the end of the meeting. Council will have the option to modify their action on items based on comments received. Action may be taken on any agenda item. There is a time limitation of three minutes per person for all emailed, voicemail, or in person comments, and only one type of public comment per person. Speaker cards are assigned for public comments that are on any items not on the agenda, and within the jurisdiction or interest of the City. Speaker Cards can be pulled until the opening of public comment at which time sign ups will no longer be allowed.

These cards can be found at the City Clerks desk. If you wish to speak regarding a scheduled agenda item, please come to the podium when the item is announced. When recognized, please begin by providing your name and address for the record (optional). Thirty minutes of public comment will be heard under this item in order of the speaker card assigned and the remaining general public comments will be heard at the end of the meeting. We will begin with number one.

CONSENT ITEMS -All matters listed under the Consent Calendar are to be considered routine by the City Council and/or Grass Valley Redevelopment Agency and will be enacted by one motion in the form listed. There will be no separate discussion of these items unless, before the City Council and/or Grass Valley Redevelopment Agency votes on the motion to adopt, members of the Council and/or Agency, staff or the public request specific items to be removed from the Consent Calendar for separate discussion and action but Council action is required to do so (roll call vote).Unless the Council removes an item from the Consent Calendar for separate discussion, public comments are invited as to the consent calendar as a whole and limited to three minutes per person.

3. Approval of the Regular Meeting Minutes of March 25, 2025.

Recommendation: Council approve minutes as submitted.

Page 2 ends

City of Grass Valley, CA AGENDA April 08, 2025

4. Health and Safety Code Section 13146.4 Report on Fire Inspections CEQA: Not a project
Recommendation: That Council adopt Resolution 2025-07, which accepts the Grass Valley Fire Department report pursuant to Health and Safety Code Section 13146.4 annual inspections for 2024

5. Nevada County Transportation Commission FY 2025/26 Overall Work Program Approval CEQA: N/A – Not a Project
Recommendation: That Council: 1) review the projects proposed for inclusion in the Nevada County Transportation Commission FY 2025/26 Overall Work Program, 2) adopt a Resolution approving the projects for inclusion in the Nevada County Transportation Commission Overall Work Program

6. 2025 Annual Measure E Street Rehabilitation Project – Authorization to Award Contract CEQA: Categorically Exempt – Section 15301 “Existing Facilities” Recommendation: That Council 1) award a contract for the 2025 Annual Measure E Street Rehabilitation Project to Sierra Nevada Construction, Inc., 2) authorize the Mayor to execute the construction contract, subject to legal review and, 3) authorize the City Engineer to approve construction change orders for up to 10% of the contract amount.

7. Extension of an agreement between the City and Nevada County for the County to provide building inspection, plan review, and other related building services for the City.

CEQA: Not a project
Recommendation: Authorize the Mayor to sign the attached Agreement between the City of Grass Valley and Nevada County for the provision of building services, subject to legal review.

8. Community Engagement Specialist Position
CEQA: Not a project.

Recommendation: That the City Council approve the creation of the Community Engagement Specialist position and authorize the promotion of an existing qualified employee to fill the position, with backfilling of any resulting vacancies.

9. Purchase of a Pierce Manufacturing 107’ Ascendant Aerial Ladder Truck CEQA: Not a Project
Recommendation: That 1) Council direct the Fire Chief to enter into an agreement with Pierce Manufacturing for one 107’ Ascendant Aerial Ladder Truck, subject to legal review; 2) Direct the Finance Director to make necessary budget adjustments in the 2025/2026 Fiscal Year Budget.

10. Appointment of Planning Commissioner
CEQA: Not a Project
Recommendation: That Council approve the appointment of Matthew Wich as Planning Commissioner for Councilmember Ivy.

11. Loma Rica Open Space Fuel Reduction Project

Page 3 ends

City of Grass Valley, CA AGENDA April 08, 2025
CEQA: Exempt under CEQA Guideline §15304, Categorical Exemption Class 4 (“Minor Alterations to Land”)
Recommendation: That Council authorize the advertisement for bids for the Loma Rica Open Space Fuels Reduction Project.

12. Appointment of Measure E Oversight Committee Members CEQA: Not a Project
Recommendation: That the City Council appoint Measure E Oversight Committee member Branstrom to a term ending December 2028.

ITEMS REMOVED FROM CONSENT CALENDAR FOR DISCUSSION OR SEPARATE ACTION AND /

OR ANY ADDED AGENDA ITEMS

REORGANIZATION RELATED ITEMS

PUBLIC HEARING

ADMINISTRATIVE

13. Approve Resolution 2025-09 Renaming the road through Memorial Park to Lou Conter Way
CEQA: Not a project
Recommendation: That the City Council approve Resolution 2025-09 naming of a street within Memorial Park in Grass Valley, CA, in honor of Lou Conter, in recognition of his distinguished military service and contributions to the nation and community.

14. Partnership between Grass Valley Police Animal Services and Wayward Journey CEQA: Not a project
Recommendation: That Council (1) receive a presentation by GVPD and Wayward Journey; and (2) direct the Chief of Police to sign an MOU, subject to legal review.

15. Condon Park Road Maintenance Project – Authorization to Award Contract CEQA: Categorically Exempt – Section 15301 “Existing Facilities” Recommendation: That Council 1) award a contract for the Condon Park Road Maintenance Project to the lowest responsive bidder, subject to the bid protest period, 2) authorize the Mayor to execute the construction contract, subject to legal review, and 3) authorize the City Engineer to approve construction change orders for up to 10% of the contract amount.

16. Downtown Street Rehab Project – Authorization to Award Contract CEQA: Categorically Exempt – Section 15301 “Existing Facilities” Recommendation: That Council 1) award a contract for the Downtown Street Rehab Project to Hansen Bros Enterprises, 2) authorize the Mayor to execute the construction contract, subject to legal review, 3) authorize the City Engineer to approve construction change orders for up to 10% of the contract amount, 4) authorize the Finance Director to execute a budget amendment of $400,000 in Water Funds to the project and 5) provide any further direction to Staff on final intersection and pedestrian safety controls.

BRIEF REPORTS BY COUNCIL MEMBERS

Page 4 ends

City of Grass Valley, CA AGENDA April 08, 2025

CONTINUATION OF PUBLIC COMMENT

ADJOURN

POSTING NOTICE
This is to certify that the above notice of a meeting of The City Council, scheduled for Tuesday, April 8, 2025, at 6:00 p.m., was posted at city hall, easily accessible to the public, as of 5:00 p.m. Thursday, April 3, 2025.
________________________
Taylor Whittingslow, City Clerk

Page 5 ends

PROCLAMATION
Arts, Culture & Creativity Month April 2025
WHEREAS, Arts, Culture & Creativity Month of April is the 7th annual statewide celebration first established by the California legislature in 2019; and
WHEREAS, the City of Grass Valley believes that arts, culture and creativity are essential to our thriving community; and
WHEREAS, the benefits of the arts impact our HEALTH by reducing depression, lowering stress hormones, and increasing longevity through regular engagement and attendance at cultural events; and
WHEREAS, the benefits of the arts impact our HOPE by fostering a sense of community and personal fulfillment, inspiring optimism and resilience in the face of challenges; and WHEREAS, the benefits of the arts impact our HEALING by offering therapeutic experiences that restore well-being, enhance mental and physical health, and support emotional recovery; and WHEREAS, culture creates connections, encourages understanding, and strengthens community; and
WHEREAS, creativity sparks innovation, growth, and positive change; and WHEREAS, the City Council, and countless local art organizations and artists lead efforts to advance the arts through programs, partnerships, and the community-building initiatives such as implementing public art programs within the City; and
WHEREAS, the City of Grass Valley values partnering with the Nevada County Arts Council and state-level arts organizations such as California for the Arts and California Arts Council; and WHEREAS, the City of Grass Valley partners with the City of Nevada City, the Grass Valley Chamber, the Nevada City Chamber, and with the Nevada County Arts Council in administering the Grass Valley-Nevada City Cultural District under the California Cultural District Program, pursuant to Assembly Bill 189; and
WHEREAS, this collective work at the local level and throughout the state encourages racial equity, uplifts our community, and changes our lives for the better; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Grass Valley hereby proclaims the month of April 2025 as Arts, Culture & Creativity Month, and hereby encourages those who live, work, play, and create art in the City to join in the celebration! Dated this 8th day of April 2025.
_____________________________ _____________________________ Hilary Hodge, Mayor Haven Caravelli, Vice Mayor
________________________________
Jan Arbuckle, Council Member
____________________________ _____________________________ Joseph Bonomolo, Council Member Thomas Ivy, Council Member

Page 6 ends

Item # 1.

GRASS VALLEY
City Council Regular Meeting, Capital Improvements Authority and Redevelopment "Successor Agency"
Tuesday, March 25, 2025 at 6:00 PM
Council Chambers, Grass Valley City Hall | 125 East Main Street, Grass Valley, California Telephone: (530) 274-4310 – Fax: (530) 274-4399
E-Mail: [email protected] Web Site: www.cityofgrassvalley.com

MINUTES

CALL TO ORDER
Meeting called to order at 6:00 pm

PLEDGE OF ALLEGIANCE
Mayor Hodge led the Pledge of Allegiance.

ROLL CALL

PRESENT
Councilmember Jan Arbuckle
Councilmember Joe Bonomolo
Councilmember Tom Ivy
Vice Mayor Haven Caravelli
Mayor Hilary Hodge

AGENDA APPROVAL -
Motion made to approve agenda as submitted by Councilmember Arbuckle, Seconded by Vice Mayor Caravelli.

Voting Yea: Councilmember Arbuckle, Councilmember Bonomolo, Councilmember Ivy, Vice Mayor Caravelli, Mayor Hodge

REPORT OUT OF CLOSED SESSION
No closed-door meeting.

INTRODUCTIONS AND PRESENTATIONS

1. Child Abuse Prevention Month Proclamation

2. Proclamation for Rotary of Grass Valley 100th Anniversary

3. Annual presentation from the Grass Valley Downtown Association.

PUBLIC COMMENT –
In-person Public comment: Speakers 1 through 5 (Noted change speaker # 3 did not speak).

Virtual Public Comment attached.

CONSENT ITEMS -

Page 7 ends

Item # 3.

City of Grass Valley, CA MINUTES March 25, 2025
Public Comment: Bob Branstrom
Virtual Public Comment attached.

Motion made to approve the consent by Councilmember Arbuckle, Seconded by Vice Mayor Caravelli.

Voting Yea: Councilmember Arbuckle, Councilmember Bonomolo, Councilmember Ivy, Vice Mayor Caravelli, Mayor Hodge

4. Approval of the Regular Meeting Minutes of March 11, 2025.

Recommendation: Council approve minutes as submitted.

5. Emergency Cleaning of WWTP Anaerobic Digester at a Total Cost of $448,400 CEQA: Exempt – Existing Facilities
Recommendation: Council to authorize the Utilities Director to approve the emergency cleaning of the WWTP anaerobic digester from Bristola, in accordance with Section 3.08.150 of the Grass Valley Municipal Code.

6. Resolutions opposing local forest health, wildfire mitigation, social, and economic impacts that will result from federal funding cuts
CEQA: Not a project
Recommendation: That the Council 1) adopt resolution 2025-06 opposing the local impacts to forest health and wildfire mitigation that will result from federal funding and staffing cuts to our public lands; 2) adopt resolution 2025-05 opposing the local economic impacts that will result from federal funding cuts; and 3) Provide direction to staff to draft a cover letter, to be approved by the Mayor and Vice Mayor, expressing the City’s opposition to federal staffing and funding cuts.

ITEMS REMOVED FROM CONSENT CALENDAR FOR DISCUSSION OR SEPARATE ACTION AND /

OR ANY ADDED AGENDA ITEMS

REORGANIZATION RELATED ITEMS

PUBLIC HEARING

ADMINISTRATIVE

7. Fiscal Year 2024-2025 Mid-Year Budget Review
CEQA: Not a project
Recommendation: It is recommended that the City Council approve the Mid-Year Budget Review and the proposed revisions through a motion.

Jennifer Styczynski, Deputy Finance Director, gave the presentation to the council.

Break taken at 7:23 pm. Meeting called back to order at 7:30 pm Public comment: Bob Branstrom, Rob Katizine,
Council discussed reserves, capital projects, possible tariffs, non-fungible funds, Subcommittee of Vice Mayor Caravelli and Mayor Hodge as a budget committee.

Motion made that the City Council approve the Mid-Year Budget Review and the proposed revisions by Councilmember Arbuckle, Seconded by Vice Mayor Caravelli.

Page 8 ends

Item # 3.

City of Grass Valley, CA MINUTES March 25, 2025
Voting Yea: Councilmember Arbuckle, Councilmember Bonomolo, Councilmember Ivy, Vice Mayor Caravelli, Mayor Hodge

8. Parking Assessment Presentation
CEQA: Not a project
Recommendation: That (1) Council hear the presentation from staff and Dixon Resources Unlimited regarding their operational needs assessment; and (2) provide direction on next steps.

Haven Caravelli recues herself due to owning a business within the zone and Tom Ivy recues himself due to owning property within the 500 radius of the parking zone.

Break taken at 7:49 pm. Meeting called back to order at 8:00 pm.

Alex Gammelgard, Police Chief, gave an introduction to the item, and Julie Dixon from Dixon Resources Unlimited gave a presentation to the Council.

Council discussed employee parking and residential overnight parking.

Public Comment: Bob Branstrom, Robin Galvin-Davis, Rob Katizine, Pam, Annamarie Trigger, Jedidiah Watson, Michelle Oakland,
Virtual public comments are attached.

The council directed staff to return with a draft of a Residential Parking policy and information on parking enforcement.

9. Code of Conduct Update
CEQA: Not a project
Recommendation: That Council review and adopt the attached revised Code of Conduct.

Tim Kiser, City Manager, gave a presentation to the Council.

Motion made to review and adopt the attached revised Code of Conduct, with one change to remove "The Union" and replace with local media by Councilmember Arbuckle, Seconded by Vice Mayor Caravelli.

Voting Yea: Councilmember Arbuckle, Councilmember Bonomolo, Councilmember Ivy, Vice Mayor Caravelli, Mayor Hodge

BRIEF REPORTS BY COUNCIL MEMBERS
Vice Mayor Caravelli attended the Cultural Forwards Cities Meeting, and will not be at the April 8th meeting. Councilmember Ivy attended the Nevada County Transit Commission and Transportation Commission meetings and the Pioneer Community Energy meeting.

Councilmember Bonomolo attended the Solid Waste Commission meeting and met with the GVDA and Grass Valley Chamber. Councilmember Arbuckle spent the week in DC and had a meeting at the White House with the intergovernmental affairs director, met with Congressman Kiley, attended the Nevada County Law Enforcement Meeting, attended the Elected and Appointed Women's Tea at the County, the Power of the Purse, Sierra Harvest Soup Night, and Classical music put on with Music in the Mountains. Vice Mayor Hodge attended the GVDA Board Meeting, Cultural District Interview, Arts & Cultural District Meuse Magazine is released, the women's Day Reception was exceptional, and Wednesday with the Mayor will be on the 26th from 9 am to 11 am.

Page 9 ends

Item # 3.

City of Grass Valley, CA MINUTES March 25, 2025

CONTINUATION OF PUBLIC COMMENT

ADJOURN
The meeting was adjourned at 9:49 pm.
____________________________ ________________________________ Hilary Hodge, Mayor Taylor Whittingslow, City Clerk
Adopted on:_________

Page 10 ends

Item # 3.
3lzslZsCITY OF GRASS VALLEY CITY COUNCIL MEETING

GENERAL PUBLIC COMMENT SIGN IN SHEET
WELCOME to the City of Grass Vattey City Council meeting! Pubtic Comments provide an opportunity for the public to address the City Counciton any subject which is not on the agenda but in the jurisdiction of the councit. lf you wish to speak, ptease indicate in the appropriate box when you sign in and take the number corresponding to your name. Each individual can have up to 3 minutes of pubtic comment. At the beginning of the meeting, there wi[[ be an allotted 30 minutes of generat pubtic comments and the remainder of comments wil[ be heard at the end of the agenda.

Speakers witt be catled in order of the numbers given.

When you are recognized by the mayor:

1. Ptease stand before the podium and give your name and address. (optionat)

2. Please limit your comments to three minutes per speaker.

3. lf previous speakers have made the same point, you may simpty indicate your support or disagreement, unless you have new information.

Thank you for your participation.
#'s Print Name
Or N/A
Address
(optional)
Self/Business
(optional)
1 \ .1qp il, rrk \ef Ccftsr\tnlh/
2 '7 ^d" 3 .l :-T-tcuura\ --:r-+ UVr
4 F*)r"nab f,lerqlo Gy ^
Fpp-
$jYt Sltr^ rrrl,l,r/ tot t/.J.^. tIJr, il. \t(
6 I
7 8
9 10
11 12
13 14
a
a
z
l.
\.

Page 11 ends

Item # 3.
1 Taylor Whittingslow
From: SHIRI LOVE - Voicemail box 8880 <[email protected]> Sent: Tuesday, March 25, 2025 4:40 PM
To: Public Comments
Subject: Voicemail from on Mar 25 2025 4:35 PM
Attachments: 1742945709-00001554.mp3

M
m
m
You received a new voicemail message

M
m
m
New voicemail message
Time: Tuesday, March 25 2025 4:35 PM
From:

Duration: 3 minutes 58 seconds
Voicemail box: 8880
Transcript:

When they say Palestinian territory, they mean the entire of Israel. Zionists are anyone who is pro-Israel and love Israel, but also mean 9 million Israelis. So when they say, I'm not anti-Semitic, I'm just anti-Zionist, no. Because radical Islam use deceiving words that often Westerners do not understand, the complete nuances and significances and what the enemy of Israel is actually meaning and intending.

And groups like Nevada City for Palestine and Nevada County Peace and Justice stand behind those type of wordings and parroting it in our city councils. They belittle Middle Eastern voices like myself who were born and raised in the conflict because Their media told them to not listen to the Zionists. They ignite and perpetuate hatred, systematically normalizing the humanization of Israelis and Jewish Americans locally. In their crowd, there are many bullies whom for a year and a half now cry to our city council about humanity and how the war between Israel and Hamas is somehow a local issue, convince us that they are on the good side of history, while bullying us, Jewish Middle Eastern locals, in the backstage of their propaganda proPage 12 Item # 3.
2 terrorism show. Free Palestine is a hijacked movement that isn't a grassroots movement, but rather a well-funded jihadist, anti-Semitic organization. It was created by Yasser Arafat, who was an extremist, father of terrorism, who quite literally created the Palestinian cause to be used as a turgen horse against Israel with the sole purpose of igniting and feeding the narrative that Israel has no right to exist and get the world supporting an idea that Israel should be demolished. Is illegal and present a relentlessly false history and distorted truth about Jews and Israelis. For example, Jews aren't European and never were. Our city councils are engaging with a radical Islamist propaganda, with a group of local radicals brainwashed mob who support Hamas out loud and on the podium of our city hall. A recognized terrorist organization surrendering to their request to put on their table a document that was created by a corrupt American Islamist organization CAIR who recently was exposed for receiving funds from well-established terrorist groups as well as under simple research you can find their members also supporting Hamas on all their social media platforms. Several top executives have been convicted of terror-related crimes. As a result, the FBI has publicly announced that it has terminated any outreach activities with the national organization, which bills itself as America's largest Muslim civil liberties and advocacy organization. They are missing $7 million in taxpayer money and cash that is unaccounted for. I really believe that you guys are doing extremely wrong to our community by engaging with these people. And our statement is that we want a resolution of no forging intervention in city politics. Thank you.

Rate this transcript's accuracy
M
m
m
Mailbox Capacity: 97/99 available
© 2025 GoTo Group, Inc.
333 Summer St, Boston, MA 02210, United States
Follow us on Twitter, LinkedIn, Facebook

Page 13 ends

Item # 3.

Page 14 ends

Item # 3.
4 H.Ben Winkler
Grass Valley, CA
641-451-7076
[email protected]

Page 15 ends

Item # 3.
5 Taylor Whittingslow
From: MARK GOLD - Voicemail box 8880 <[email protected]> Sent: Tuesday, March 25, 2025 4:32 PM
To: Public Comments
Subject: Voicemail from on Mar 25 2025 4:28 PM
Attachments: 1742945319-0000154b.mp3

M
m
m
You received a new voicemail message

M
m
m
New voicemail message
Time: Tuesday, March 25 2025 4:28 PM
From:

Duration: 1 minute 40 seconds
Voicemail box: 8880
Transcript:

Hi. My name is Mark Gold. My wife and I own Goldbush Cookie Company right across the street from City Hall. I received a letter from Waste Management that basically stated that due to a recent audit, they found that we had not been billed for our curbside organics collection for the months of January, February, and March, and that they were going to send as a supplemental bill regarding that. Now I reached out to waste management, spent an hour on the phone with multiple people and in the end they told me that there's nothing they could do about it. So this was a surprise bill, you know, from them. And after finally talking with somebody, they said that it really comes down to the contract and the contract was with the city of Grass Valley.

Now, I'm assuming that I'm not the only person who's affected by this, but effectively what they're saying is that I'm going to have to owe another $204. Now, this is an unexpected bill. I think it's unfair that waste management couldn't get their act together and bill us correctly. And so I'm requesting that the city council talk to the city manager or whoever's responsible for the contract with waste management and

Page 16 ends

Item # 3.
6 see about possibly getting these charges reversed. And that's all I have to say. Thank you so much. Have a great meeting.

Rate this transcript's accuracy
M
m
m
Mailbox Capacity: 97/99 available
© 2025 GoTo Group, Inc.
333 Summer St, Boston, MA 02210, United States
Follow us on Twitter, LinkedIn, Facebook

Page 17 ends

Item # 3.
7 Taylor Whittingslow
From: THE FINER POINT - Voicemail box 8880 <[email protected]> Sent: Tuesday, March 25, 2025 3:39 PM
To: Public Comments
Subject: Voicemail from (510) 206-5456 on Mar 25 2025 3:35 PM Attachments: 1742942130-000014fa.mp3

M
m
m
You received a new voicemail message

M
m
m
New voicemail message
Time: Tuesday, March 25 2025 3:35 PM
From:

Duration: 2 minutes 34 seconds
Voicemail box: 8880
Transcript:

Hello, my name is Jason Miller. I'm a resident at 107 Ventana Ridge Place in Grass Valley, California. And my comment is that I strongly discourage the council from attempting to pass resolutions related to foreign politics. Foreign policy is for the federal government, not the city government. I'm sure there are many local issues with parks, roads, schools, and commerce that need to be addressed. But instead, at the request of Councilman Tom Ivey and seconded by Councilman Joe Bonamolo, we are here to discuss how the city should interpret politics abroad, 4 ,000 miles away. This wastes the city's time and money. Furthermore, the influences that seek to waste our time on this are racist and not only want to discuss what the Jews are doing and only want to discuss what the Jews are doing in the Middle East. This doesn't come from a concern for Muslims, for Muslim women and children. It comes from a racist desire to slander Jews abroad, and now, here at home. How can we see that this is true? Because we're not here to discuss the 1.2 million Muslims who are currently in Chinese concentration camps, or the 400 ,000 Muslims in Yemen who

Page 18 ends

Item # 3.
8 have been starved to death, men, women, and children. We're not here to discuss the 1 ,200 Alawites who were, just a few weeks ago, massacred by Islamist extremists, made to crawl around like dogs while they were butchered in front of their families.

The radical Islamists uploaded those videos to social media just like they did on October 7th. They are proud of it, but we're not here to talk about that, or the one million Afghan refugees who were expelled last year from Pakistan. These are foreign events that nobody wants to discuss. They just want to discuss Israel and what Israel is doing to get their hostages back and secure their borders from those same radical Islamists. It's only news when it's Jews. And in the 1930s, the ***** boycotted Jewish shops and now, unbelievably, similar sentiments are being pushed on the city of Grass Valley. Please, please, I implore you to avoid acting in the same way the ***** did 100 years ago. Grass Valley has always been a place of openness and tolerance, and that should not change now. You will hear from people tonight who proclaim to be Jewish, but I assure you they are no more Jewish than Hunter Biden is Catholic. Do the right thing, stay focused, stay strong, and stay local, please.

Rate this transcript's accuracy
M
m
m
Mailbox Capacity: 97/99 available
© 2025 GoTo Group, Inc.
333 Summer St, Boston, MA 02210, United States
Follow us on Twitter, LinkedIn, Facebook

Page 19 ends

Item # 3.
1 Taylor Whittingslow
From: BLIX MARIA - Voicemail box 8880 <[email protected]> Sent: Tuesday, March 25, 2025 6:17 PM
To: Public Comments
Subject: Voicemail from ( on Mar 25 2025 6:14 PM
Attachments: 1742951652-000015b7.mp3
Follow Up Flag: Flag for follow up
Flag Status: Flagged

M
m
m
You received a new voicemail message

M
m
m
New voicemail message
Time: Tuesday, March 25 2025 6:14 PM
From:

Duration: 1 minute 21 seconds
Voicemail box: 8880
Transcript:

My name is Maria Blix. I live at 131 Northridge Drive in Cross Valley. I just am really disappointed in our council members that we would give in to an organization and that there would be monetary support and a decision made to support this Palestinian group that we know very little about, who is leading their charge, you know, who's in charge of them. And it goes beyond our town's jurisdiction. And I just asked that you would do the research with these people, who they're supported by.

From what I understand, they're supported by the Muslim Brotherhood Ultimately, backed by Hamas, they want to boycott Israeli businesses, and their tenants include annihilating the Jewish nation. All I ask is that the Council investigate this group, their sponsors, and where they get their funding. We don't have any business getting

Page 20 ends

Item # 3.
2 involved in this and using taxpayer dollars to support this Palestinian group. Okay.

Thank you. Bye.

Rate this transcript's accuracy
M
m
m
Mailbox Capacity: 97/99 available
© 2025 GoTo Group, Inc.
333 Summer St, Boston, MA 02210, United States
Follow us on Twitter, LinkedIn, Facebook

Page 21 ends

Item # 3.
3 Taylor Whittingslow
From: WIRELESS CALLER - Voicemail box 8880 <[email protected]> Sent: Tuesday, March 25, 2025 5:52 PM
To: Public Comments
Subject: Voicemail from on Mar 25 2025 5:49 PM
Attachments: 1742950186-000015a8.mp3
Follow Up Flag: Flag for follow up
Flag Status: Flagged

M
m
m
You received a new voicemail message

M
m
m
New voicemail message
Time: Tuesday, March 25 2025 5:49 PM
From:

Duration: 46 seconds
Voicemail box: 8880
Transcript:

Hi, my name is Amy and I live across the street from the Mill Street parking lot at 326 Mill Street. My house does not have a driveway. I bought my house over six years ago and at that time there was an empty lot across for me and plenty of street parking. Since then the city has built a parking lot in that empty lot and when they did this it took away available street parking for myself and my neighbors. Now there is a lot with no overnight parking and a 3-hour time limit for daytime use. I walk past this parking lot every day and it sits empty quite often. I would like to ask the City Council to consider giving the nearby residents space in the lot to safely park our cars. Thank you.

Rate this transcript's accuracy
M
m
m

Page 22 ends

Item # 3.
4 Mailbox Capacity: 97/99 available
© 2025 GoTo Group, Inc.
333 Summer St, Boston, MA 02210, United States
Follow us on Twitter, LinkedIn, Facebook

Page 23 ends

Item # 3.
5 Taylor Whittingslow
From: ELVIS CANTU - Voicemail box 8880 <[email protected]> Sent: Tuesday, March 25, 2025 5:09 PM
To: Public Comments
Subject: Voicemail from ( on Mar 25 2025 5:07 PM
Attachments: 1742947675-00001586.mp3
Follow Up Flag: Flag for follow up
Flag Status: Flagged

M
m
m
You received a new voicemail message

M
m
m
New voicemail message
Time: Tuesday, March 25 2025 5:07 PM
From:

Duration: 45 seconds
Voicemail box: 8880
Transcript:

My name is Elvis and I live across the street from a new parking lot on Mill. I live in one of the three houses that doesn't have a driveway. I love my home and I love Grass Valley. Over the past two years, street parking on Mill has gotten tougher and tougher. I think it would be a grand gesture if the three houses across the street from the parking lot could get one or two permanent parking spots of their very own, either on the street or in the parking lot. I feel it would be easier for you to do this, and a very cool thing for you to do. Thank you for your time. 326 Mohr Street.

Rate this transcript's accuracy
M
m
m

Page 24 ends

Item # 3.
6 Mailbox Capacity: 97/99 available
© 2025 GoTo Group, Inc.
333 Summer St, Boston, MA 02210, United States
Follow us on Twitter, LinkedIn, Facebook

Page 25 ends

Item # 3.

City of Grass Valley
City Council
Agenda Action Sheet
Title: Health and Safety Code Section 13146.4 Report on Fire Inspections CEQA: Not a project
Recommendation: That Council adopt Resolution 2025-07, which accepts the Grass Valley Fire Department report pursuant to Health and Safety Code Section 13146.4 annual inspections for 2024
Prepared by: Roque Barrera - Fire Marshal
Council Meeting Date: 04/08/2025 Date Prepared: 03/10/2025 Agenda: Consent
Background Information: Health and Safety Code (HSC) sections 13146.2 and 13146.3 require fire departments to conduct inspections of specific occupancies once a year.

HSC section 13146.4 then requires those fire departments to report annually to the City Council on their compliance with those sections. Appendix 1, attached to this staff report, details the Grass Valley Fire Department’s 2024 inspections as required by HSC 13146.4.

Council Goals/Objectives: Exceptional Public Safety consistent with the City of Grass Valley Strategic Plan
Fiscal Impact: N/A
Funds Available: N/A Account #: N/A
Reviewed by:

Attachments: Resolution 2025-07, and Appendix 1

Page 26 ends

Item # 4.
1 RESOLUTION NO. 2025-07

A RESOLUTION OF THE COUNCIL OF THE CITY OF GRASS VALLEY,

CALIFORNIA ACKNOWLEDGING RECEIPT OF A REPORT MADE BY THE FIRE

CHIEF OF THE GRASS VALLEY FIRE DEPARTMENT REGARDING THE

INSPECTION OF CERTAIN OCCUPANCIES REQUIRED TO PERFORM

ANNUAL INSPECTIONS IN SUCH OCCUPANCIES PURSUANT TO SECTIONS 13146.2 AND 13146.3 OF THE CALIFORNIA HEALTH AND SAFETY CODE.

WHEREAS, California Health & Safety Code Section 13146.4 was added in 2018, and became effective on September 27, 2018; and,
WHEREAS, California Health & Safety Code Sections 13146.2 and 13146.3 requires all fire departments, including the Grass Valley Fire Department, that provide fire protection services to perform annual inspections in every building used as a public or private school, hotel, motel, lodging house, apartment house, and certain residential care facilities for compliance with building standards, as provided and, WHEREAS, California Health & Safety Code Section 13146.2 requires all fire departments, including the Grass Valley Fire Department, that provide fire protection services to report annually to its administering authority on its compliance with Sections 13146.2 and 13146.3 and, WHEREAS, the Council of the City of Grass Valley intends this Resolution to fulfill the requirements of the California Health & Safety Code regarding acknowledgment of the Grass Valley Fire Department’s compliance with California Health and Safety Code Sections 13146.2 and 13146.3.

NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Grass Valley that said Council expressly acknowledges the measure of compliance of the Grass Valley Fire Department with California Health and Safety Code Sections 13146.2 and 13146.3 in the area encompassed by the City of Grass Valley, as follows for 2024 “Appendix 1”:

A. EDUCATIONAL GROUP E OCCUPANCIES:

Educational Group E Occupancies are generally those public and private schools, used by more than six (6) persons at any one time for educational purposes through the 12th grade. Within the City of Grass Valley, there lie eight (12) Group E Occupancies, buildings, structures and/or facilities.

During calendar year 2024, the Grass Valley Fire Department performed the annual inspection of twelve (12) Group E Occupancies, buildings, structures and/or facilities. This is an inspection rate of 100% for this reporting period.

B. INSTITUTIONAL GROUP I OCCUPANCIES:

Institutional Group I Occupancies, for the purposes of this resolution, are generally those occupanciesin which people, cared for or living in a supervised environment and having physical limitations because of health or age are harbored for medical treatment or other care or treatment. Within the City of Grass Valley, there lies one (1) Group I occupancy, building, structure, and/or facility.

During calendar year 2024, the Grass Valley Fire Department performed the annual inspection of one (1) Group I Occupancy, building, structure and/or facility. This is an inspection rate of 100% for this reporting period.

C. RESIDENTIAL GROUP R OCCUPANCIES:

Page 27 ends

Item # 4.
2 Residential Group R Occupancies, for the purposes of this resolution, are generally those occupancies containing sleeping units, and include hotels, motels, apartments (three units or more), etc. as well as other residential occupancies (including eleven (11) residential care facilities elderly, seven (7) residential care facilities elderly with memory care facilities, one (1) transitional housing facility). These residential care facilities have a number of different sub-classifications, and they may contain residents or clients that have a range of needs, including those related to custodial care, mobility impairments, cognitive disabilities, etc. The residents may also be non-ambulatory or bedridden.

During calendar year 2024, the Grass Valley Fire Department performed the annual inspection of eleven (11) of eleven (11) R-2.1 RCFE facilities (100%), seven (7) of seven (7) R-2.1 / I-2 RCFE with memory care facilities (100%), one (1) of one (1) R-2.1 / R-1 transitional housing facility (100%), eight (8) of eight (8) R-1 hotel/motel facilities (100%), and one hundred forty-five (146) of one hundred forty-six (146) R-2 apartment buildings (100%) resulting in an overall inspection rate of 100% for the reporting period.

Adopted as a resolution of the City Council of the City of Grass Valley at a meeting thereof held on the 8th, day of April 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAINING:
__________________________
Hilary Hodge, Mayor
ATTEST: APPROVED AS TO FORM:
____________________________ ___________________________ Taylor Day, City Clerk David Ruderman, City Attorney
Attachments:
 Appendix 1 – 2024 Report

Page 28 ends

Item # 4.

Appendix 1
2024
EDUCATIONAL GROUP E OCCUPANCIES:

Educational Group E Occupancies are generally those public and private schools, used by more than six (6) persons at any one time for educational purposes through the 12th grade. Within the City of Grass Valley, there lie twelve (12) Group E Occupancies, buildings, structures and/or facilities.

During calendar year 2024, the Grass Valley Fire Department performed the annual inspection of twelve (12) Group E Occupancies, buildings, structures and/or facilities. This is an inspection rate of 100% for this reporting period.

INSTITUTIONAL GROUP I OCCUPANCIES:

Institutional Group I Occupancies, for the purposes of this resolution, are generally those occupancies in which people, cared for or living in a supervised environment and having physical limitations because of health or age are harbored for medical treatment or other care or treatment. Within the City of Grass Valley, there lies one (1) Group I occupancy, building, structure, and/or facility.

During calendar year 2024, the Grass Valley Fire Department performed the annual inspection of one (1) Group I Occupancy, building, structure and/or facility. This is an inspection rate of 100% for this reporting period.

RESIDENTIAL GROUP R OCCUPANCIES:

Residential Group R Occupancies, for the purposes of this resolution, are generally those occupancies containing sleeping units, and include hotels, motels, apartments (three units or

Page 29 ends

Item # 4.

Appendix 1
2024
more), etc. as well as other residential occupancies (including eleven (11) residential care facilities elderly, seven (7) residential care facilities elderly with memory care facilities, one (1) transitional housing facility). These residential care facilities have a number of different sub-classifications, and they may contain residents or clients that have a range of needs, including those related to custodial care, mobility impairments, cognitive disabilities, etc. The residents may also be nonambulatory or bedridden.

During calendar year 2024, the Grass Valley Fire Department performed the annual inspection of eleven (11) of eleven (11) R-2.1 RCFE facilities (100%), seven (7) of seven (7) R-2.1 / I-2 RCFE with memory care facilities (100%), one (1) of one (1) R-2.1 / R-1 transitional housing facility (100%), eight (8) of eight (8) R-1 hotel/motel facilities (100%), and one hundred forty-five (146) of one hundred forty-six (146) R-2 apartment buildings (100%) resulting in an overall inspection rate of 100% for the reporting period.

Page 30 ends

Item # 4.

City of Grass Valley
City Council
Agenda Action Sheet
Title: Nevada County Transportation Commission FY 2025/26 Overall Work Program Approval
CEQA: N/A – Not a Project
Recommendation: That Council: 1) review the projects proposed for inclusion in the Nevada County Transportation Commission FY 2025/26 Overall Work Program, 2) adopt a Resolution approving the projects for inclusion in the Nevada County Transportation Commission Overall Work Program
Prepared by: Bjorn P. Jones, PE, City Engineer
Council Meeting Date: 04/08/2025 Date Prepared: 04/03/2025 Agenda: Consent
Background Information: Staff for Nevada County Transportation Commission (NCTC) have prepared an Overall Work Program (OWP) for FY 2025/26. The OWP is prepared on an annual basis as a scope of work and budget for transportation planning activities for the fiscal year. The OWP is a requirement of NCTC’s Master Fund Transfer Agreement with the State of California and includes the following three components:

Introduction, Work Elements, and Budget.

The purpose of the proposed OWP for FY 2025/26 is to: 1) show how the Federal Planning Factors will be integrated into the OWP work elements; 2) outline continuing and new major activities; and 3) present a summary of the expected revenues and expenditures for the fiscal year. A final OWP will be presented at the May 21, 2025 NCTC meeting.

Adoption of the attached Resolution is recommended, approving the proposed projects for inclusion in the Nevada County Transportation Commission Overall Work Program.

Council Goals/Objectives: The NCTC Overall Work Program executes portions of work tasks towards achieving/maintaining Strategic Goal - City Infrastructure Investment.

Fiscal Impact: N/A Funds Available: N/A
Reviewed by: City Manager Account #: N/A

Page 31 ends

Item # 5.

RESOLUTION NO. R2025-08

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRASS VALLEY

APPROVING THE PROJECTS PROPOSED FOR INCLUSION IN THE NEVADA COUNTY TRANSPORTATION COMMISSION’S FY 2025/26 OVERALL WORK PROGRAM WHEREAS, on October 8, 1991, the Council did adopt Resolution No. 91-172, which authorized the Mayor to execute a Memorandum of Understanding on behalf of the City of Grass Valley with the Nevada County Transportation Commission relating to regional transportation planning; and
WHEREAS, in accordance with the above referenced Memorandum of Understanding, the Nevada County Transportation Commission has submitted the projects to be included in its FY 2025/26 Overall Work Program for the review and approval of the City Council of the City of Grass Valley.

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GRASS VALLEY:

1. That the City Council hereby acknowledges its approval of the projects proposed for inclusion in the FY 2025/26 Overall Work Program of the Nevada County Transportation Commission as submitted; and

2. That the City Council encourages the Nevada County Transportation Commission to continue its efforts to coordinate the regional transportation planning process and to work closely with the staff of the City of Grass Valley to identify and resolve issues that are of common concern.

3. That the City Council encourages the Nevada County Transportation Commission to continue its efforts to analyze the current fixed route/paratransit delivery model and examine alternative delivery options, such as microtransit, micro-mobility, and dial-a-ride to determine the most cost-effective way to provide enhanced transit services.

ADOPTED by the City Council of the City of Grass Valley at a regular meeting held the 8 th day of April, 2025, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
_______________________________
Hillary Hodge, MAYOR
APPROVED AS TO FORM: ATTEST:
__________________________________ _______________________________ Michael G. Colantuono, CITY ATTORNEY Taylor Whittingslow, CITY CLERK

Page 32 ends

Item # 5.
101 Providence Mine Road, Suite 102, Nevada City, California 95959  (530) 265-3202  Fax (530) 265-3260 E-mail: [email protected]  Web Site: www.nctc.ca.gov
File: 1030.0

MEMORANDUM
TO: Nevada County Transportation Commission
FROM: Michael Woodman, Executive Director
SUBJECT: Draft FY 2025/26 Overall Work Program
DATE: March 19, 2025
RECOMMENDATION: Provide comments on Nevada County Transportation Commission's (NCTC) Draft FY 2025/26 Overall Work Program (OWP).

BACKGROUND: Annually each Regional Transportation Planning Agency (RTPA) develops an OWP for formal adoption by its governing board. The OWP outlines the scope of work and budget for various transportation planning activities. The OWP is a requirement of NCTC’s Master Fund Transfer Agreement with the State of California and includes the following three components: Introduction, Work Elements (W.E.), and Budget. The purpose of this draft OWP for FY 2025/26 is:

1. To show how the Federal Planning Factors will be integrated into the OWP Work Elements.

2. To outline continuing and new activities.

3. To present a summary of the expected revenues and expenditures for the fiscal year.

A final OWP will be presented for approval at the May 21, 2025 NCTC meeting.

FEDERAL PLANNING FACTORS FOR FY 2024/25
As shown in the chart on page I-6 in the Draft OWP, the Federal Planning Factors that are included in Fixing America’s Surface Transportation Act (Section 134(h), FAST Act, 2015) have been integrated into NCTC’s FY 2025/26 OWP:

1. Support the economic vitality of the region, especially by enabling global competitiveness, productivity, and efficiency.

2. Increase the safety of the transportation system for motorized and non-motorized users.

3. Increase the security of the transportation system for motorized and non-motorized users.

4. Increase the accessibility and mobility of people and for freight.

MICHAEL WOODMAN, Executive Director
AARON HOYT, Deputy Executive Director
LOU CECI – Nevada City City Council
SUSAN HOEK – Nevada County Board of Supervisors
TOM IVY – Grass Valley City Council, Chair
JAY STRAUSS – Member-At-Large
DUANE STRAWSER – Member-At-Large
ROBB TUCKER – Nevada County Board of Supervisors, Vice Chair JAN ZABRISKIE – Town of Truckee
Grass Valley • Nevada City Nevada County • Truckee

Page 33 ends

Item # 5.

Draft FY 2025/26 Overall Work Program
March 19, 2025

Page 2 ends

101 Providence Mine Road, Suite 102, Nevada City, California 95959  (530) 265-3202  Fax (530) 265-3260 E-mail: [email protected]  Web Site: www.nctc.ca.gov

5. Protect and enhance the environment, promote energy conservation, improve the quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns.

6. Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight.

7. Promote efficient system management and operation.

8. Emphasize the preservation of the existing transportation system.

9. Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation.

10. Enhance travel and tourism.

OWP WORK ELEMENTS
NCTC's OWP integrates the Commission's organizational activities of Planning, Communication, and Coordination into two broad Work Elements: Communication and Coordination, and Regional Planning.

Each Work Element is further subdivided into projects that accomplish specific tasks or objectives.

Status of projects in the prior FY 2024/25 OWP:
• Reenvisioning Transit in Western Nevada County: This planning study is carried over into the FY 2025/26 OWP. The consultant procurement process will begin in March 2025 and the selected consultant will conduct the analysis during FY 2025/26 and complete the planning effort in FY 2026/27. Completion of the Draft Report is anticipated by May of 2026 and the completion of the Final Report is anticipated in September of 2026. (WE 2.3.4) • Zion St. Mobility/School Access Study: This planning study is on-going and carried over into the FY 2025/26 OWP. The consultant will complete the analysis during FY 2025/26. Completion of the Draft Report is anticipated by November of 2025 and the completion of the Final Report is anticipated in March of 2026. (WE 2.3.4)
• Nevada County Regional Transportation Plan (RTP) Update: The Draft 2045 Nevada County Regional Transportation Plan is scheduled to be presented at the May 2025 NCTC meeting and the Final Report adopted in July 2025. This planning effort and associated work element are not carried forward into FY 2025/26. (WE 2.1.1)
• Eastern Nevada County Transit Development Plan: Complete. The final report was accepted as complete in January 2025. (WE 2.3.3)
• Nevada County Local Road Safety Plan: Complete. The final report was accepted as complete in January 2025. (WE 2.4.1)
• Rural Counties Task Force Rural Induced Demand Study: The Final Report was completed in February 2025 and public outreach activities will continue through May of FY 2024/25. This planning effort and associated work element is not carried forward into the FY 2025/26 OWP. (WE 2.4.4)
• Zero Emission Vehicle Transition Plan for County of Nevada: Complete. The final report was completed in September 2024. This planning effort and associated work element are not carried forward into the FY 2025/26 OWP. (WE 2.4.6)

Page 34 ends

Item # 5.

Draft FY 2025/26 Overall Work Program
March 19, 2025

Page 3 ends

101 Providence Mine Road, Suite 102, Nevada City, California 95959  (530) 265-3202  Fax (530) 265-3260 E-mail: [email protected]  Web Site: www.nctc.ca.gov
The following ongoing activities have been integrated into the Draft FY 2025/26 OWP:

1. State Transportation Improvement Program Projects:

A. SR 49 Corridor Improvement Project from La Barr Meadows Road to McKnight Way:

NCTC will continue to participate with Caltrans District 3 in the preparation of Plans, Specifications, and Estimates and Right-of-Way for a future construction project. (WE 2.2).

B. SR 49 Grass Valley Evacuation Route Project: NCTC will continue to participate in the preparation of the Project Approval / Environmental Documentation and Plans, Specifications, and Estimates and Right-of-Way for a future construction project.

2. Planning/Administration Projects:

A. Congestion Mitigation and Air Quality (CMAQ) Funding: Monitor project activities as shown on the multi-year project listing. (WE 2.1)

B. Air Quality Conformity Process: Monitor changes in EPA requirements. (WE 2.1) C. Airport Land Use Commission Planning and Reviews: NCTC staff will continue to serve as staff for the Nevada County and Truckee Tahoe Airport Land Use Commissions and will conduct reviews of projects near the airports for consistency with the adopted Airport Land Use Compatibility Plans. (WE 2.4.2)
D. Rural Counties Task Force Chair Activities & CARL Administration: Starting in July 2024 the NCTC Deputy Executive Director will serve as the Chairman of the Rural Counties Task Force (RCTF). The State of California contains 26 rural counties, which generally have populations of less than 250,000 and do not have a single urbanized area greater than 50,000.

Rural counties provide food, fiber, timber, and mineral products for California industry and residents, as well as recreation for urban residents and tourists. In order to provide a direct opportunity for the small counties to remain informed, have a voice, and become involved with changing statewide transportation policies and programs, a task force was formed in 1988 as a joint effort between the California Transportation Commission (CTC) and the rural counties.

There are 26 rural county Regional Transportation Planning Agencies (RTPAs) or Local Transportation Commissions represented on the Rural Counties Task Force (RCTF). The RCTF is an informal organization with no budget or staff that generally meets every other month. A member of the CTC usually acts as liaison to the RCTF, and CTC and Caltrans staff typically attend these meetings to explain and discuss changing statewide transportation issues that may be of concern to the rural counties.

The California Academy for Regional Leaders (CARL) is a program developed by the California Association of Councils of Governments (CALCOG). The CARL program supports participants in their efforts to strengthen their organizations and increase their personal effectiveness by helping them develop leadership skills, expand their knowledge of

Page 35 ends

Item # 5.

Draft FY 2025/26 Overall Work Program
March 19, 2025

Page 4 ends

101 Providence Mine Road, Suite 102, Nevada City, California 95959  (530) 265-3202  Fax (530) 265-3260 E-mail: [email protected]  Web Site: www.nctc.ca.gov
the systems that impact their agencies, and build state-wide professional networks. One of the duties of the RCTF Chairman is to coordinate scholarships to the CARL program, funded with State Regional Planning Assistance funds. (WE 2.4.5) To assist Caltrans in the review of the NCTC FY 2024/25 OWP, staff has included a list of Rural Planning Assistance (RPA) eligible activities in each work element that uses RPA funds. As the name indicates, RPA funds are to be used for planning. RPA funds cannot be used for project development, project study reports, project implementation, or transit administration. attachments

Page 36 ends

Item # 5.

Nevada County
Transportation Commission
2025/26 Overall Work Program
Draft – March 19, 2025

Page 37 ends

Item # 5.

TABLE OF CONTENTS
Page
EXECUTIVE SUMMARY .................................................................................................ES-1 NCTC MISSION STATEMENT............................................................................................I-1 NCTC ORGANIZATION FLOW CHART .........................................................................I-2 OVERALL WORK PROGRAM INTRODUCTION .........................................................I-3 WORK ELEMENT 1 – COMMUNICATION AND COORDINATION...............................1 Project 1.1 General Services and Communication..............................................................2 Project 1.2 Fiscal Administration........................................................................................3 WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING ............................5 Project 2.1 Transportation Planning...................................................................................7 Project 2.1.1 Nevada County Regional Transportation Plan Update..................................10 Project 2.2 Transportation Improvement Programs.........................................................12 Project 2.3 Transit and Paratransit Programs...................................................................14 Project 2.3.3 Eastern Nevada County Transit Development Plan.......................................16 Project 2.3.4 Reenvisioning Transit ............................................................................................18 Project 2.4 Coordination of Regional Planning ...............................................................19 Project 2.4.1 Local Road Safety Plan .........................................................................................22 Project 2.4.2 Airport Land Use Commission Planning and Reviews .................................23 Project 2.4.3 Zion St. Mobility/School Access Study.................................................................24 Project 2.4.4 Rural Counties Task Force Rural Induced Demand Study…........................25 Project 2.4.5 Rural Counties Task Force......................................................................................27 Project 2.4.5a CARL Administration.............................................................................................28 Project 2.4.6 Zero Emission Vehicle Transition Plan for County of Nevada .......................... 29 WORK ELEMENT 3 - CALTRANS ACTIVITIES WITH NCTC......................................31 Glossary of Terms and Acronyms ...........................................................................................32 BUDGET TABLES:

TABLE 1 Budget Summary............................................................................................B-1 TABLE 2 Direct Costs....................................................................................................B-2 TABLE 3 Indirect Costs.................................................................................................B-3 TABLE 4 Revenues…........................................................................................................B-4 TABLE 5 Expenditures.......................................................................................................B-5 TABLE 6 Budget Detail .................................................................................................B-6

Page 38 ends

Item # 5.

I-1

NEVADA COUNTY TRANSPORTATION COMMISSION

CREATING A BETTER FUTURE BY BUILDING UPON SUCCESSES OF THE PAST

MISSION STATEMENT
The mission of the Nevada County Transportation Commission is to plan, communicate, and coordinate with the citizens and decision makers of Grass Valley, Nevada City, Nevada County, Town of Truckee, and with Caltrans to identify transportation needs, propose solutions, and assist in implementing projects to create a balanced regional transportation system, while protecting the rural qualities and historic character of Nevada County.

Activities to Achieve the Mission Include, But are not Limited to, the Following:
 NCTC develops a Regional Transportation Plan (RTP) which includes the actions, funding recommendations, and policy direction necessary to meet the needs of each transportation system component in the region.
 NCTC interacts with the community through workshops, news media outlets, the NCTC website, and through social media platforms.
 NCTC develops and adopts a Regional Transportation Improvement Program (RTIP) that is consistent with the RTP.
 NCTC conducts a comprehensive planning process in the development of its annual Overall Work Program so that funds expended on planning projects will implement the goals of the RTP.  NCTC reviews transportation plans and programs of member agencies and endorses them based on consistency with the RTP and RTIP. In keeping with this responsibility, NCTC strives to be creative in assisting the region in developing the revenues to construct improvement projects.  NCTC communicates and participates in workshops with Caltrans on proposed projects to be developed in the County of Nevada to ensure that the policies and goals of the RTP are implemented.  NCTC coordinates with regional transportation planning agencies on legislation and statewide policy issues to ensure the region receives appropriate attention and funding from the State of California and the Federal government.
 NCTC participates in interregional planning projects to ensure Nevada County projects support both regional and statewide transportation goals.
 NCTC administers Transportation Development Act funds to ensure all statutory requirements are met, including the identification of the region's transit needs.  NCTC manages Regional Surface Transportation Program funds, Regional Transportation Mitigation Fee funds, Congestion Mitigation and Air Quality Improvement Program funds, Carbon Reduction Program, and Regional Improvement Program funds in accordance with Federal acts and statutes promulgated by the State of California, selecting and funding eligible transportation improvement projects based upon those that are most effective and beneficial to the region.

Page 39 ends

Item # 5.

I-2
Nevada County Transportation Commission
Organization Flow Chart
Nevada County Transportation Commission (NCTC)
NCTC is a Regional Transportation Planning Agency (RTPA) created pursuant to Title 7.88 of the State of California Government Code, Section 67920. As the RTPA for Nevada County, NCTC coordinates transportation planning for Grass Valley, Nevada City, Nevada County, and the Town of Truckee. The NCTC board has seven members. Four members are appointed by the Board of Supervisors and three are appointed by the incorporated municipalities in the County. The Board of Supervisors appoints two of its members and two County at-large representatives. The municipalities appoint three city/town council members; one each from Nevada City, Grass Valley, and the Town of Truckee.

Technical Advisory Committee (TAC)
The TAC is made up of representatives of public transit operators, local public works and planning departments, public airport operators, the air pollution control district, and Caltrans. The Committee provides technical input on transportation issues and ensures there is coordination and cooperation in the transportation planning process.

Social Services Transportation Advisory Council (SSTAC) The SSTAC is made up of potential transit users who are representatives of the general public; seniors and/or disabled; social service providers for seniors, disabled, and persons of limited means; local social service and consolidated transportation providers; and Truckee residents who represent the senior and Latino communities. The goal of the SSTAC is to maintain and improve transportation services to the residents of Nevada County, particularly the underserved and under-represented members of the community, such as the elderly and disabled. The SSTAC recommends action to the Commission relative to the unmet transit needs findings, and advises the Commission on transit issues, including coordination and consolidation of specialized transportation services.

Airport Land Use Commissions (ALUCs)
The Nevada County Transportation Commission has been designated as the Airport Land Use Commission for the Nevada County Airport and provides staff for the Truckee Tahoe ALUC. The purpose of Airport Land Use Commissions is to protect public health, safety, and welfare by ensuring the orderly expansion of airports and adoption of land use measures that minimize the public's exposure to excessive noise and safety hazards within the areas around the airports, to the extent that these areas are not already devoted to incompatible uses.

Nevada County Demographics
As of January 1, 2024, the population of Nevada County was estimated at 100,177. The largest municipality is Truckee with a population of 16,778, followed by Grass Valley at 13,400 and Nevada City at 3,347. The population of the unincorporated portion of the County was 66,652. The Race and Ethnicity data for Nevada County on Census.gov reported the racial makeup of the county as 83.7% White, followed by 10.2% Hispanic, 1.4% Asian,

1.0% Native American, 0.4% Black or African American, 0.1% Native Hawaiian and Pacific Islander, and 3.4% Some Other Race. The data at Census.gov indicates that 11% of the population was below the poverty level.

Page 40 ends

Item # 5.

OVERALL WORK PROGRAM INTRODUCTION
NCTC annually adopts a budget through the preparation of an Overall Work Program (OWP). This work program includes specific “Work Elements” that describe the planning projects and associated activities that are to be conducted, and identifies the type of funds that will pay for the expenditures, such as Rural Planning Assistance (RPA), Local Transportation Funds (LTF), Regional Surface Transportation Program (RSTP), Planning, Programming, and Monitoring (PPM), or Federal Transit Administration (FTA). A Memorandum of Understanding (MOU) between NCTC, the Cities of Grass Valley and Nevada City, the Town of Truckee, and the County of Nevada provides the framework for NCTC’s coordination of regional transportation planning with local governments in Nevada County. The Commission staff prepares a draft OWP and in accordance with the MOU, solicits and integrates comments from each of the jurisdictions. The proposed work program is then submitted to the Commission for approval and forwarded to Caltrans. Caltrans, as the grantor of Rural Planning Assistance funds and Federal Transit Assistance funds, approves the OWP. The budget reflects the on-going regional transportation planning process in Nevada County. Major concerns of each of the jurisdictions and Caltrans are reflected in the elements and levels of funding. The OWP is updated each year to report on the progress of identified projects, propose new or continuing projects for the ensuing year, and to provide an estimate of the required funding of the OWP work elements.

Public Participation
Public involvement is a major component of the transportation planning and programming processes. NCTC makes a concerted effort to solicit public input from all Nevada County residents, including under- represented groups, in many aspects of transportation planning within Nevada County. Specific examples are listed below:
• NCTC maintains a website (www.nctc.ca.gov), a Facebook page, and a Twitter account to keep the public informed of transportation planning and programming efforts underway in Nevada County. Agendas are posted on the bulletin boards of local jurisdictions and emailed to mobile home parks, residential homeowners associations, senior centers, environmental advocates, associations representing the private sector, and individuals that have asked to be included on the distribution list. Citizens are encouraged to attend and speak at NCTC meetings on any matter included for discussion on the agenda at that meeting. • Articles on the preparation of the Regional Transportation Plan (RTP) and Regional Transportation Improvement Program (RTIP), as well as the public comment periods, are posted on the NCTC website. • Copies of the Draft RTP are made available for review at the main public libraries in western and eastern Nevada County, as well as on the NCTC website.
• Press releases are sent to the media establishments in western and eastern Nevada County announcing the Draft RTP is available for review and comment and noting some key findings. • Public hearings are held and noticed in the main newspapers in western and eastern Nevada County prior to adoption of the RTP and RTIP.
• Each year public notifications are sent out to encourage participation in transportation planning processes, such as the annual unmet transit needs public hearing and numerous public workshops relating to the transportation projects and planning activities of NCTC.
• In accordance with AB52, NCTC conducts outreach and Tribal Consultation on any projects for which NCTC is lead agency and files a Notice of Preparation, Notice of Mitigated Negative Declaration or Notice of Negative Declaration. While there are currently no federally recognized tribes located within Nevada County, NCTC consults with the Native American Heritage Commission to identify Native American tribal organizations with historic or cultural interests regarding lands in Nevada County. These groups include but are not limited to the Nisenan of the Nevada City Rancheria and United Auburn Indian Community (UAIC). • NCTC consults with USDA Forest Service Tahoe National Forest and Bureau of Land Management.

I-3 Page 41
Item # 5.

Regional Issues, Needs, and Goals
The main transportation issues in western Nevada County are related to providing adequate multimodal transportation infrastructure and services to meet the needs of the County, while maintaining and enhancing the rural character and environmental qualities of the area. In western Nevada County, interregional traffic adds to the existing challenge and need to maintain and improve the transportation system.

In eastern Nevada County, the issues also stem from the challenges to meet the needs related to the high volumes of traffic generated by travelers taking advantage of the world-class recreational opportunities available in the TruckeeNorth Tahoe area. In addition to discretionary recreation demand travel, high housing costs have increased daily commuter trips into and out of the Truckee/North Tahoe region. To address these issues requires a multimodal and multijurisdictional approach to transportation planning in the region.

Acquiring adequate and timely funding for transportation improvements is the central need within all of the Nevada County issues. Implementation of highway and regional roadway improvements will be key to providing efficient operations, while improving safety and air quality. The 2020 Census reported that approximately 28.5% of the county population was over 65 years of age, between 2010 and 2020 that population increased from 19.6% to 28.5%, and it is projected that by 2030 this population is expected to increase to over 40%. As the population of residents over the age of 65 increases, it will result in increased demand for public transit services in Nevada County. Additional local, state, and federal transit operating and capital revenues, will be necessary in order to meet the additional demand placed on the public transit systems.

Transportation issues facing Nevada County which have been identified as regionally significant include the following:
• Insufficient state, federal, and local transportation revenues • Air quality/greenhouse gas emission reductions
• Coordination of land use, air quality, and transportation planning • Providing and maintaining a transportation system that enhances safety, the efficient movement of all people, goods, services, and information, and environmental quality • Efficient implementation of new technologies, including zero-emission bus fleets and charging technology
• High cost of housing and short-term rentals increasing commute trips and distances • Improvements to the regional transportation system to ensure safe and efficient emergency evacuation
Recognition of these issues leads to the overall goal of the Regional Transportation Plan, which is to provide and maintain a transportation system that enhances safety, the efficient movement of all people, goods, and services, and environmental quality. In the Policy Element this overarching goal is divided into the following four goals:
1) Provide for the safe and efficient movement of all people, goods, services, and information; 2) Reduce adverse impacts on the natural, social, cultural, and historical environment and the quality of life;
3) Develop an economically feasible multimodal transportation system; 4) Create and maintain a comprehensive, multi-modal transportation system to serve the needs of the County.

I-4 Page 42
Item # 5.

The following list of projects and planning efforts indicates progress made toward implementing the goals of the Regional Transportation Plan:
• Support of ongoing operation of Nevada County Connects, Truckee Tahoe Area Regional Transit, and associated paratransit services
• SR 49-La Barr Meadows Road Signalization and Widening project, constructed 2013 • SR 20/49 Dorsey Drive Interchange project, constructed 2014 • SR 49 Bicycle and Pedestrian Improvement project, constructed 2014 • SR 49 Signal Pre-emption, programmed 2012 STIP, constructed 2015/16 • SR 89 “Mousehole” Grade Separation, programmed 2012 STIP, constructed 2015/16 • Northeast Grass Valley Sidewalk Improvements, constructed 2015/16 • Newtown Road Class II/III Bike Lanes, constructed 2016/17 • Nevada County Active Transportation Plan, 2018/19
• SR 49 Multimodal Corridor Plan, 2019/20
• SR 174/20 Intersection Analysis, 2019/20
• NCTC Travel Demand Model Update, 2019/20
• Town of Truckee Transit Center Relocation Feasibility Study, 2020/21 • Western Nevada County Transit Development Plan 2021/22 • SR 49 Comprehensive Multimodal Corridor Plan 2021/22
• SR 49-La Barr Meadows to McKnight Way, Environmental Impact Report 2021/22, Plans, Specifications, and Estimates 2023/24
• SR-49 Interstate 80 to McKnight Way Safety Needs Assessment 2021/22 • Ready Nevada County Extreme Climate Event Mobility and Adaptation Plan, 2021/22 • Legacy Trail – Brockway Multi-use Path, Construction 2021/22 • Legacy Trail Phase 4, Plans, Specifications, and Estimate, 2021/22 • Church Street Extension and Trout Creek Restoration, Plans Specifications, and Estimates 2021/22 • Truckee Railyard Mobility Hub, Right of Way Acquisition, Plans Specifications, and Estimate, 2022/23 • West River Streetscape Improvement Project, Plans, Specifications, and Estimate, 2022/23 • Town of Truckee Microtransit Feasibility Study 2022/23 • Coldstream/I-80 Off Ramp Roundabout, Construction 2022/23 • SR 20 Omega Curve Correction, Planning, Environmental, and Design completed. Construction completion target: Winter 2025.
• SR 49 Multi-modal Corridor Improvement Project was awarded $13.8 million from the Active Transportation Program, 2022/23. Construction to begin FY 2026/27. • SR 174/49/20 Roundabout and Active Transportation Safety Project was awarded $5.4 million from the Active Transportation Program, 2022/23. Construction to begin FY 2026/27. • SR 49 Corridor Improvement Project: 2023/24 - $14.6 million awarded of Trade Corridor Enhancement Program (TCEP) funding for southbound improvements between McKnight Way Interchange and La Barr Meadows Road. Construction to begin FY 2025/26.
• SR 49 Grass Valley Wildfire Evacuation Route Project: 2023/24 - $35 million awarded of Local Transportation Climate Adaptation Program (LTCAP) funding. Construction to begin FY 2025/26.

I-5

Page 43 ends

Item # 5.

Federal Planning Factors:

As shown in the chart below, the Federal Planning Factors have been integrated into NCTC’s FY 2023/24 OWP:

1. Support the economic vitality of the region, especially by enabling global competitiveness, productivity, and efficiency.

2. Increase the safety of the transportation system for motorized and non-motorized users.

3. Increase the security of the transportation system for motorized and non-motorized users.

4. Increase the accessibility and mobility of people and for freight.

5. Protect and enhance the environment, promote energy conservation, improve the quality of life, and promote consistency between transportation improvements and State and local planned growth, housing, and economic development patterns.

6. Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight.

7. Promote efficient system management and operation.

8. Emphasize the preservation of the existing transportation system.

9. Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation.

10. Enhance travel and tourism.

Planning Factors WE

1.1 WE

1.2 WE

2.1 WE

2.1.1 WE

2.2 WE

2.3 WE

2.3.3 WE

2.3.4 WE

2.4 WE

2.4.1 WE

2.4.2 WE

2.4.3 WE

2.4.4 WE

2.4.5 WE

2.4.6 Economic Vitality X X X X X X X X X X
Safety X X X X X X X X X X X X X
Security X X X X X X X X X X
Accessibility X X X X X X X X X X X
Environment X X X X X X X X X X X X
Connectivity X X X X X X X X X X X
System Management &
Operation X X X X X X X X X X X X X X X
Preservation X X X X X X X X X X X
Resiliency & Reliability X X X X X X X X X X X X
Travel & Tourism X X X X X X X X X
I-6 Page 44
Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 1
WORK ELEMENT 1 - COMMUNICATION AND COORDINATION
Public involvement is a major component of NCTC's planning process. The activities and products from Project 1.1, General Services and Communication, are intended to provide the public with complete information and timely notices, thereby giving full public access to key decisions.

Work Element 1 incorporates the following activities that are an integral part of accomplishing NCTC's Mission:
 NCTC interacts with the community through workshops, news media outlets, NCTC webpage, and social media platforms.
 NCTC conducts a comprehensive planning process in the development of its annual Overall Work Program so that funds expended on planning projects will implement the goals of the RTP.

NCTC has the statutory responsibility to administer Transportation Development Act (TDA) funds, and to ensure that all expenditures of TDA funds are in conformity with the Regional Transportation Plan (RTP). NCTC also administers funds received from the Regional Surface Transportation Program (RSTP) and the Regional Transportation Mitigation Fee (RTMF) program. The work performed under Project 1.2, Fiscal Administration, has been incorporated into the NCTC Mission as follows:
 NCTC administers Transportation Development Act funds to ensure all statutory requirements are met, including the identification of the region's transit needs.  NCTC manages Regional Surface Transportation Program funds, Regional Transportation Mitigation Fee funds and Regional Improvement Program funds in accordance with Federal acts and statutes promulgated by the State of California, selecting and funding eligible transportation improvement projects based upon those that are most effective and beneficial to the region.

Through communication, collaboration, and public outreach activities, Work Element 1 incorporates the ten Federal Planning Factors (see page I-5) into the NCTC planning program.

Information and data developed through these activities are included in the Regional Transportation Plan and in transit planning documents.

Page 45 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 2
WORK ELEMENT 1 - COMMUNICATION AND COORDINATION (continued) Project 1.1 - General Services and Communication
Purpose: Conduct communication and public outreach activities. Provide administrative and financial support for the operation of the Nevada County Transportation Commission and its advisory committees through the activities listed below.

Additional/Continuing Work:
• Public information and outreach activities (LTF)
• Preparation of agendas, minutes, notices, and correspondence (LTF) • Track legislation pertinent to the transportation planning process (LTF) • Technical Advisory Committee (TAC) activities (LTF)
• Provide staff services to SSTAC (LTF)
• Personnel administration (LTF)
• Maintain and update the NCTC website (LTF)
• Office lease (LTF)
• Purchase equipment (LTF)
• Maintain the Commission's office and equipment (LTF)
• Press releases and social media platforms (LTF)
• Reports on legislative measures and monitor legislation that impacts transportation planning. (LTF) • Update Conflict of Interest Code (LTF)
• Update DBE Program (LTF)
• Coordination with public safety agencies regarding the safety and security of the transportation system (LTF)
• Coordinate implementation of projects in the Regional Transportation Mitigation Fee (RTMF) Program. (LTF)
• Work with Nevada County, Grass Valley, and Nevada City to implement projects included in the multi-year Congestion Mitigation Air Quality (CMAQ) project listing. (LTF) • Apply for FTA planning grants. (LTF)
• Annual Legislative Platform (LTF)
Products:
• Documentation of Commission and/or TAC meetings (Bimonthly) • Executive Director's Reports (Bimonthly)
• Personnel reviews (Annual)
• FTA Section 5311 Program of Projects (Mar 26)
Budget 1.1
Revenues:

LTF $350,097.84
RTMF $7,500.00
Total $357,597.84
Expenditures:

Staff $252,975.97
Indirect $47,621.87
Consulting $57,000.00
Total $357,597.84
Totals may not equal addition of amounts in columns due to rounding.

Indirect costs are paid with local funds (see Budget Table 5).

Page 46 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 3
WORK ELEMENT 1 - COMMUNICATION AND COORDINATION (continued) Project 1.2 - Fiscal Administration
Purpose: Administer funds held by NCTC in accordance with the provisions of the TDA Guidelines and State and Federal requirements through the activities listed below.

Previous Work:
• Develop and oversee Overall Work Program and annual budgets • Oversee fiscal and performance audits, as required
• Provide assistance to claimants in completing claims and resolving audit findings and/or recommendations
• Preparation of State Controller's Annual Report
• Annual "Unmet Transit Needs" public hearing (SSTAC)
• Preparation of monthly financial reports
• Review and process claims for TDA funds
• Reports to Caltrans regarding FTA grants and RPA funds • Update transportation/transit claim guidelines and forms • Administer the Regional Surface Transportation Program • Accounting/payroll
• Coordination of community transit services and funding with Consolidated Transportation Service Agencies
• Triennial Performance Audit for FYs 2021/22, 2022/23, and 2023/24 Additional/Continuing Work:
• Develop and oversee Overall Work Program and annual budgets (LTF) • Oversee fiscal and performance audits, as required (LTF) • Provide assistance to claimants in completing claims and resolving audit findings and/or recommendations (LTF)
• Preparation of State Controller's Annual Report (LTF) • Annual "Unmet Transit Needs" public hearing (LTF)
• Preparation of monthly financial reports (LTF)
• Review and process claims for TDA funds (LTF)
• Reports to Caltrans regarding FTA grants and RPA funds (LTF) • Update transportation/transit claim guidelines and forms (LTF) • Administer the Regional Transportation Mitigation Fee Program (RTMF) • Administer the Regional Surface Transportation Program (LTF) • Accounting/payroll (LTF)
• Coordination of community transit services and funding with Consolidated Transportation Service Agencies (LTF)
• Administer Federal Transit Administration revenues (5311, Cares Act, and CRRSAA) (LTF) • Administration of Senate Bill (SB) 125 funding
Products:
• Closeout FY 2024/25 OWP (Sept 25)
• State Controller’s Annual Report (Dec 25)
• Manage FY 2025/26 Overall Work Program (July 25-June 26) • Draft FY 2026/27 Overall Work Program (Mar 26)
• Final FY 2026/27 Overall Work Program (May 26)
• Completed Fiscal and Compliance Audit (Mar 26)

Page 47 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 4
WORK ELEMENT 1 - COMMUNICATION AND COORDINATION (continued) Project 1.2 - Fiscal Administration (continued)
• Accounting Reports/Payroll/Payment Authorizations/Tax Reports (Ongoing) • Financial reports (Monthly)
• Findings of Apportionment (Feb 26)
Budget 1.2
Totals may not equal addition of amounts in columns due to rounding Indirect costs are paid with local funds (see Budget Table 5).

Revenues:

LTF $353,630.49
SB 125 Administration $20,000.00
Total $373,630.49
Expenditures:

Staff $263,901.86
Indirect $49,678.63
Fiscal Audits $60,050.00
Total $373,630.49

Page 48 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 5
WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING
NCTC has the responsibility to prepare and adopt a Regional Transportation Plan (RTP) directed to the achievement of a coordinated and balanced regional transportation system. The plan is to be action-oriented and pragmatic, considering both the short-and-long term future, and is to present clear, concise policy guidance to local and state officials. Projects 2.1 (Transportation Planning),

2.1.1 (Nevada County Regional Transportation Plan Update), 2.2 (Transportation Improvement Programs), 2.3 (Transit and Paratransit Programs), and 2.4 (Coordination of Regional Planning), are tied to the NCTC Mission by the following activities:
 NCTC develops a Regional Transportation Plan (RTP) which includes the actions, funding recommendations, and policy direction necessary to meet the needs of each transportation system component in the region.
 NCTC develops and adopts a Regional Transportation Improvement Program that is consistent with the RTP.
 NCTC reviews transportation plans and programs of member agencies and endorses them based on consistency with the RTP and RTIP. In keeping with this responsibility, the NCTC strives to be creative in assisting the region in developing the revenues to construct improvement projects.
 NCTC communicates and participates in workshops with Caltrans on proposed projects to be developed in the County of Nevada to ensure that the policies and goals of the RTP are implemented.
 NCTC coordinates with regional transportation planning agencies on legislation and statewide policy issues to ensure the region receives appropriate attention and funding from the State of California and the Federal government.  NCTC participates in interregional planning projects to ensure Nevada County projects support both regional and statewide transportation goals.

The following activities and products included in Work Element 2 are appropriate uses of Rural Planning Assistance Funds:
 Participate in Federal and State Clean Air Act transportation related air quality planning activities. (Projects 2.1 and 2.2)
 Develop and/or modify tools that allow for better assessment of transportation impacts on community livability and emergency preparedness (e.g. integration of GIS and census data into the regional traffic model and development of performance measurement tools and strategies). (Projects 2.1 and 2.4)
 Identify and document transportation facilities, projects, and services required to meet the regional and interregional mobility and access needs. (Projects 2.1, 2.2, and 2.3)  Define solutions and implementation issues in terms of the multimodal transportation system, land use and economic impacts, financial constraints, air quality and environmental concerns (including wetlands, endangered species, and cultural resources). (Projects 2.1 and 2.2)  Assess the operational and physical continuity of transportation system components within and between metropolitan and rural areas, and interconnections to and through regions. (Projects

2.1, 2.3, and 2.4)

Page 49 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 6
WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued)  Conduct transit needs public hearings and prepare transit development plans and transit marketing plans as appropriate. (Project 2.3)
 Investigate methods to reduce vehicle travel and methods to expand and enhance travel services. (Projects 2.3 and 2.4)
 Incorporate transit and intermodal facilities, bicycle transportation facilities, and pedestrian walkways in projects where appropriate. (Projects 2.1, 2.2 and 2.3)  Participate with regional, local and state agencies, the general public, and the private sector in planning efforts to identify and implement policies, strategies, programs and actions that maximize and implement the regional transportation infrastructure. (Projects 2.1, 2.2, 2.3, and

2.4)
 Conduct collaborative public participation efforts to further extend transportation planning to communities previously not engaged in discussion. (Project 2.1 and 2.3)  Create, strengthen, and use partnerships to facilitate and conduct regional planning activities between Caltrans, RTPAs, Metropolitan Planning Organizations (MPOs), transit districts, cities, counties, the private sector, and other stakeholders. (All WE 2 Projects)  Use partners to identify and implement policies, strategies, programs and actions that enhance the movement of people, goods, services, and information. (Projects 2.1 and 2.3)  Ensure that projects developed at the regional level are compatible with statewide and interregional transportation needs. (Projects 2.2 and 2.4)  Conduct planning and project activities (including corridor studies, and other transportation planning studies) to identify, develop, and monitor current and future STIP projects. (Projects

2.1 and 2.2)
 Implement ways to meet transportation needs by using existing transportation facilities more efficiently. Encourage owners and operators of transportation facilities/systems to work together to develop operational objectives and plans maximizing utilization of existing facilities. (Projects 2.1, 2.3 and 2.4)
 Document environmental and cultural resources and develop and improve coordination between agencies using Geographic Information Systems (GIS), Intelligent Transportation Management Systems (ITMS), and other computer-based tools. (Projects 2.1 and 2.4) Work Element 2, Regional Transportation Planning, incorporates the ten Federal Planning Factors into the NCTC planning program (see page I-6).

Monitoring safety and operational data of transportation facilities and services in Projects 2.1 and

2.3 will aid NCTC efforts to incorporate “safety” and “security” within the planning process.

Through expanded Technical Advisory Committee meetings, transportation planning will be coordinated with emergency preparedness plans in the region. Systems management and operational data will be used to identify opportunities to increase transit ridership and develop operational improvements for regional transportation facilities. Management and operations data will also be key components in guiding capital investment plans for regional transportation system facilities and services. Planning activities will include coordination with nonemergency human service transportation providers. NCTC will also provide information to regional transit operators to ensure appropriate safety, security, and operational training opportunities are provided.

Page 50 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 7
WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.1 - Transportation Planning
Purpose: Regional planning and implementation, monitoring the regional transportation system, and implementation of the Regional Transportation Plan through the activities listed below. • Update travel demand models and circulation plans.
• Coordinate the RTP with Caltrans planning documents.
• Coordinate the RTP with county, town, and city general plans. • Complete planning studies on projects in the RTP to be programmed in the RTIP. • Plan and coordinate local, regional, state, and federal funding for RTP projects (e.g., RTMF, STIP, RSTP, SHOPP, CMAQ, and federal grants).

Previous Work:
• NCTC staff participated in meetings and workshops related to current State funding opportunities and provided input on State guidelines development and eligibility requirements for future grant funding cycles.
• NCTC staff participated in an I-80 Focus Group meeting with Nevada County OES and Sheriff’s Office Staff, Truckee CHP, Truckee Fire, Caltrans and various affected local agencies to discuss short-term coordination, evacuation and detouring issues, and long-term Planning Opportunities to be prepared for future disasters.
• NCTC staff continued collecting and analyzing freight data on SR 49 in relation to I-80 emergency detours and continued coordinating with Caltrans District 3 to discuss potential wildfire evacuation climate adaptation projects that could help to reduce evacuation times in the SR 49 corridor. • NCTC Staff researched and participated in meetings regarding evacuation initiatives and current climate related impacts.
• NCTC staff continued to meet with Nevada County OES staff and consultant firm Ladris to discuss evacuation routes and emergency evacuation scenarios and simulations. • NCTC and the Nevada County Office of Emergency Services continued to discuss coordination and partnership opportunities in relation to a mutual desire to conduct coordinated wildfire/evacuation research with the University of California Los Angeles Environmental Engineering Department utilizing western Nevada County as a test bed region for the testing and further development of the latest technical modeling platforms. • NCTC staff also participated in meetings with Nevada County OES regarding other current evacuation planning initiatives underway.
• NCTC continued conversations with the University of California Los Angeles Environmental Engineering Department on wildfire research and prepared a letter of collaboration in support of a grant submittal to the National Science Foundation to establish a Research Center CyPRES (Community Pyro-Resilience, Equitability, and Sustainability). • NCTC coordinated with Caltrans District 3 Safety Division to analyze and review accident data in the SR 20 corridor between Grass Valley and the Yuba County line. • NCTC monitored the development and status of all Caltrans projects located within the boundaries of the SR 49 Corridor System Management Plan (CSMP) and monitored accident data for regional roadways within Nevada County.
• NCTC enhanced its public engagement activities and outreach efforts by expanding its social media footprint and identified disadvantaged and vulnerable community groups, in an effort to better serve those communities.
• NCTC staff prepared and issued a Congestion Mitigation Air Quality Improvement Program (CMAQ) and Carbon Reduction Program (CRP) call for projects and reviewed the project applications and prepared preliminary rankings. Staff also coordinated with the Technical Advisory Committee to discuss draft funding recommendations.

Page 51 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 8
WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.1 - Transportation Planning (continued)
• NCTC staff met with partnering agencies to discuss options of funding all submitted applications for CMAQ and CRP projects.
• NCTC staff began preparation of the submittal to the Interagency Consultation Working Group for their review and recommended reaffirmation of the previous determination of the State Route 49 Corridor Improvement Project as exempt.
• NCTC staff coordinated with Caltrans to explore opportunities to implement the SR 49 Corridor System Management Plan and monitor existing traffic conditions and safety data. NCTC staff continue to monitor the development and status of all Caltrans projects located within the boundaries of the SR 49 Corridor System Management Plan (CSMP) and work with the design team to minimize right-of-way impacts.
• NCTC staff coordinated with Caltrans and CTC on the $35 million funding awarded for the SR 49 Grass Valley Evacuation Route Project to widen Highway 49 between Ponderosa Pines Way and Wolf Road.

Additional/Continuing Work:
• Monitor implementation of the Comprehensive Multimodal Corridor Plan (CMCP) recommendations. (NCTC) (RPA, LTF, & PPM)
• Solicit input from citizens and transportation stakeholders, including the Native American community, disadvantaged communities, and agencies regarding transportation issues. (NCTC) (RPA & LTF)
• Update capital improvement needs lists. (NCTC) (RPA, LTF & PPM) • Coordinate with the Town of Truckee’s update of the Trails Master Plan (NCTC)(RPA) • Work with Northern Sierra Air Quality Management District (NSAQMD) to determine air quality impacts of regional transportation plans and improvement programs. (NCTC) (RPA & LTF) • NCTC staff will continue to coordinate with Caltrans, the Northern Sierra Air Quality Management District and other agencies regarding planning related to the Federal 8-hour ozone standards and air quality conformity. (NCTC) (RPA & LTF) • Develop information to evaluate goods movement impacts on the region'stransportation system and consider air quality issues related to goods movement. (NCTC) (RPA, LTF, & PPM). • Update Highway Performance Monitoring System (HPMS) data. (NCTC) (RPA, LTF, & PPM) • Incorporate local agency transportation CIPs and master plans into the RTP and RTIP as appropriate. (NCTC) (RPA, LTF, & PPM)
• Assist member agencies with review and update of transportation capital improvement programs (CIPs) and master plans. (NCTC) (RPA, LTF, & PPM) • Update traffic model land use files. (NCTC) (RPA, LTF, & PPM) • Participate in updates of Nevada County, Truckee, Grass Valley, Nevada City General Plans. (NCTC) (RPA, LTF, & PPM)
• Conduct and update planning studies as needed for regional projects identified by NCTC, TAC, and member agencies. (NCTC) (RPA, LTF, & PPM)
• Analyze alternative growth scenarios and report on related infrastructure needs and costs. (NCTC) (RPA, LTF, & PPM)
• Identify Right-of-Way needed for future transportation projects. (NCTC) (RPA, LTF, & PPM) • Conduct technical studies necessary to support policies and projects included in the RTP. (NCTC) (RPA, LTF, & PPM)

Page 52 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 9
WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.1 - Transportation Planning (continued)
• Work with Nevada County's GIS staff to ensure the following airport information is included in the GIS database: airport locations, airport boundaries, noise contours, airport influence area, and ground access routes to airports. (NCTC) (RPA & LTF)
• Coordinate with public safety agencies. (NCTC) (RPA & LTF) • Local participation in regional planning and updating traffic counts (NCTC, Grass Valley, Nevada City, Town of Truckee, Nevada County) (RPA)
• Monitor existing traffic conditions and safety data. (NCTC) (RPA & LTF) • Coordinate with Caltrans to develop and implement performance measures in the regional planning process. (NCTC) (RPA & LTF)
• Coordinate with Northern Sierra Air Quality Management District (NSAQMD) and California Air Resources Board (CARB) to assist in development of the Statewide Implementation Plan (SIP) for western Nevada County. (NCTC) (RPA & LTF)
• Review and compare the California State Transportation Agency Final Climate Action Plan for Transportation Infrastructure (CAPTI) to the RTP policies, regional needs, and projects to determine if the projects align with proposed investment strategies. (NCTC) (RPA & LTF) • When developing regional transportation projects and updating planning documents, NCTC will consider and incorporate transit services, intermodal facilities, and pedestrian bicycle facilities whenever appropriate. (NCTC) (RPA & LTF)
• Planning activities related to CMAQ program including preparation and releasing of call for projects, review and ranking applications, project selection, and programming. (NCTC) (RPA & LTF) • Coordinate review of safety and design concerns of state highway projects. (NCTC) (RPA, LTF & PPM) • Identify and analyze issues relating to integration of regional transportation and community goals and objectives in land use, housing, economic development, social welfare and environmental preservation. (NCTC) (RPA & LTF)
• SB743 VMT Forecasting Tool and Web Hosting. (NCTC/Consultant) (LTF) • Analyze climate related impacts to the transportation system and identify strategies to address resiliency. (NCTC) (RPA & LTF)
Products:
• Documentation of Air Quality Conformity Process (As Needed) • Traffic count updates (Annual)
• Reports on new issues and projects to be included in the RTP (Annual) • Progress reports on project planning activities (Bimonthly) Budget 2.1
Revenues:

LTF $13,078.99
RPA Formula $146,299.25
STIP Planning PPM $3,178.69
Total $162,556.93
Expenditures:

Staff $69,477.94
Indirect $13,078.99
Transportation Eng $40,000.00
Local Agency $30,000.00
Traffic Counts $10,000.00
Total $162,556.93
Totals may not equal addition of amounts in columns due to rounding Indirect costs are paid with local funds (see Budget Table 5).

Page 53 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 10 WORK ELEMENT 2 – REGIONAL TRANSPORTATION PLANNING (continued) Project 2.2 – Transportation Improvement Programs
Purpose: To monitor implementation of the Regional Transportation Improvement Program (RTIP) and Interregional Transportation Improvement Program (ITIP) funding and provide policy analysis and recommendations regarding the RTIP and the State Transportation Improvement Program (STIP) through the activities listed below.

Previous Work:
• NCTC staff participated in the State Transportation Improvement Program (STIP) Guidelines workshop.
• NCTC continued interagency coordination to identify and consider new RTIP projects and the need for future Project Initiation Documents.
• NCTC staff continued to monitor STIP projects and implementation of NCTC’s Regional Transportation Improvement Program (RTIP).
• NCTC staff coordinated with Caltrans District 3 and Caltrans Headquarters to propose and secure Interregional Improvement Program funding in the 2024 STIP to provide the necessary funding to construct the improved access to the Nevada County Transit Operations Center and zero emission bus charging infrastructure.
• Begin preparation of draft 2024 RTIP - October 2023
• NCTC staff coordinated with Caltrans District 3 and Caltrans Headquarters in the preparation and submittal of the programming request for Regional Improvement Program and Interregional Improvement Program funding in the 2024 STIP for the construction of the State Route 49 Corridor Improvement Project.
• Public hearing and adoption of 2024 RTIP - November 2023 • Submittal of 2024 RTIP to the CTC - December 2023
• NCTC staff continued coordination as a member of the project development team and attended regular meetings with Caltrans Project Management regarding the SR 49 Corridor Improvement Project (CIP) and Caltrans SHOPP project 4E170 and 3H510. • NCTC staff continued coordination with Caltrans to identify incremental projects to accelerate safety improvements in the SR 49 corridor between Grass Valley and the Combie Road/Wolf Road intersection.

Additional/Continuing Work:
• NCTC staff will continue to work closely with Caltrans District 3 and Headquarters staff on Climate Adaptation projects that can be incorporated into the transportation infrastructure network within Nevada County. (NCTC) (RPA & LTF)
• Monitor STIP implementation. (NCTC) (RPA & LTF)
• Encourage interagency coordination necessary to identify and develop new RTIP projects. (NCTC) (RPA & LTF)
• Communicate and coordinate with Caltrans to identify and implement incremental projects to accelerate the safety improvements to the SR 49 corridor between Grass Valley and the Combie/Wolf Road intersection. (NCTC) (RPA & LTF)
• Coordinate with Caltrans regarding Interregional Transportation Improvement Program (ITIP) participation in STIP funded projects in Nevada County. (NCTC) (RPA & LTF) • Review and comment on ITIP funding criteria proposed in the Caltrans Strategic Investment Strategy (CSIS). (NCTC) (RPA & LTF)
• Begin preparation of draft 2026 RTIP - October 2025 (NCTC) (RPA & LTF) • Public hearing and adoption of 2026 RTIP - November 2025 (NCTC) (RPA& LTF) • Submittal of 2026 RTIP to the CTC - December 2025 (NCTC) (RPA & LTF)

Page 54 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 11 WORK ELEMENT 2 – REGIONAL TRANSPORTATION PLANNING (continued) Project 2.2 – Transportation Improvement Programs (continued) • Review consistency of future RTIP projects with the Climate Action Plan for Transportation Infrastructure and California Transportation Plan 2050 (NCTC) (RPA & LTF) • NCTC will continue to participate with Caltrans District 3 in the preparation of the Design and Right-of-Way phases for the proposed improvements on SR 49 from La Barr Meadows Road to McKnight Way. (NCTC) (RPA & LTF)
• SR 49 Grass Valley Evacuation Route Project: NCTC will continue to participate in the preparation of the Project Approval/Environmental Documentation and Plans, Specifications, and Estimates and Right-of-Way for a future construction project.

Products:
• Status reports on Nevada County’s STIP projects (Bimonthly) • Reports regarding implementation of the Nevada County RTIP (Ongoing) • Reports on implementation of Caltrans SR 49 Comp Multimodal Corridor Plan (Annual) Budget 2.2
Revenues:

LTF $15,885.40
RPA Formula $84,386.11
Total $100,271.51
Expenditures: Staff $84,386.11
Indirect $15,885.40
Total $100,271.51
Totals may not equal addition of amounts in columns due to rounding

Page 55 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 12 WORK ELEMENT 2 – REGIONAL TRANSPORTATION PLANNING (continued) Project 2.3 – Transit and Paratransit Programs
Purpose: Work with city, county, and town staff to improve efficiency, productivity, and cost effectiveness of existing transit and paratransit systems through the activities listed below.

Previous Work:
• NCTC staff continued to work with the Nevada County Transit Services to examine capital funding opportunities for planned improvements to the Nevada County Transit Operations Center and plans for Zero Emission Bus transition.
• NCTC staff also coordinated with Nevada County Transit Services to develop a proposed scope of work for a Comprehensive Operational Analysis to analyze the current fixed route/paratransit delivery model and examine alternative delivery options, such as microtransit, micro-mobility, and dial-a-ride to determine the most cost-effective way to provide enhanced mobility.
• NCTC staff continued to work with the Town of Truckee to identify funding opportunities for long-term implementation of the Town’s microtransit pilot and construction of the new Transit Center at the Truckee Railyard.
• NCTC staff coordinated with the Placer County Transportation Planning Agency, Tahoe Regional Transportation Planning Agency, Washoe County Transportation Commission, Nevada County, Placer County, and Capitol Corridor Joint Powers Agency to explore opportunities to coordinate to help advance the mutual goal of expanding passenger rail service to Truckee/Reno and develop last mile transit connections. • NCTC staff monitored transit and paratransit statistics and compliance with the requirements of the TDA and participated in the ATCI/MAPCO group and SSTAC. • NCTC staff also assisted transit operators with administrative challenges related to Cares Act and CRRSAA funding.
• NCTC staff coordinated and participated in the monthly Truckee Convene, Champion & Catalyze (CCC) meetings established by the Board of Supervisors, to discuss the Truckee area transportation/transit issues and improvement plans.

Additional/Continuing Work Activities:
• Assist in implementation of Transit Development Plans and Nevada County Coordinated Public Transit-Human Services Transportation Plan. (NCTC) (RPA & LTF) • Monitor ridership, expenditures, and revenue data for each system. (NCTC) (RPA & LTF) • Hold coordination meetings with transit and paratransit providers. (NCTC) (RPA & LTF) • Check operational performance indicators for each system. (NCTC) (RPA & LTF) • Develop and present information regarding alternative forms of transportation that are practical for Nevada County. (NCTC) (RPA & LTF)
• Coordinate with human service transportation providers. (NCTC) (RPA & LTF) • Distribute press releases and other educational information regarding alternative forms of transportation. (NCTC) (RPA & LTF)
• Participate on the Accessible Transportation Coalition Initiative-Mobility Action Partners Coalition. (NCTC) (RPA & LTF)
• Assist transit operators with feasibility analysis of transit electrification mandate. (NCTC) (RPA & LTF)
• Coordinate with Town on public polling effort in consideration of 2024 Transportation -Transit Ballot Measure (NCTC) (RPA & LTF)

Page 56 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 13 WORK ELEMENT 2 – REGIONAL TRANSPORTATION PLANNING (continued) Project 2.3 – Transit and Paratransit Programs (continued) • Monitor ridership, expenditures, and revenue for each system. (NCTC) (RPA & LTF) • Hold coordination meetings with transit and paratransit providers. (NCTC) (RPA & LTF) • Check operational performance indicators for each system. (NCTC) (RPA & LTF) • Develop and present information regarding alternative forms of transportation that are sustainable and practical for Nevada County. (NCTC) (RPA & LTF) • Coordinate with human service transportation providers. (NCTC) (RPA & LTF) • Distribute press releases and other educational information regarding alternative forms of transportation. (NCTC) (RPA & LTF)
• Participate on the Accessible Transportation Coalition Initiative-Mobility Action Partners Coalition. (NCTC) (RPA & LTF)
• Administer Federal Transit Administration 5311 revenues. (LTF & RPA) • Planning and coordination with transit operators in the development of grant applications for the Transit Intercity Rail Capital Program (TIRCIP) competitive program. (NCTC) (RPA & LTF) • Planning and coordination with transit operators in the development and administration of Senate Bill 125 TIRCIP and Zero Emission Transit Capital Program. (NCTC) (RPA & LTF) Products:
• Reports to the Commission regarding staff participation in the transit and paratransit planning processes (Bimonthly)
• Quarterly ridership, expenditure, and revenue reports for each system • Quarterly operational performance reports for each system • Bi-monthly minutes of the Accessible Transportation Coalition Initiative-Mobility Action Partners Coalition.
.

Budget 2.3
Revenues:

LTF Carryover $18,132.61
RPA Formula $56,395.68
Total $74,528.29
Expenditures:

Staff $56,395.68
Indirect $18,132.61
Total $74,528.29
Totals may not equal addition of amounts in columns due to rounding Indirect costs are paid with local funds (see Budget Table 5).

Page 57 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 14 WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.3.4 – Reenvisioning Transit in Western Nevada County/Comprehensive Operational Analysis (COA)
Purpose: The Reenvisioning Transit in Western Nevada County / Comprehensive Operational Analysis (COA) will comprehensively review the existing transit services offered and identify areas and opportunities to transition to alternative operating models to provide greater system efficiency and ridership benefits. Similar to many other transit systems across the nation, Nevada County Connects (fixed route transit service) has not rebounded from the impacts of the COVID 19 Pandemic and it is imperative to identify the most cost effective and efficient services with the limited operational funding streams available to meet the needs of the residents and visitors of Western Nevada County. NCTC will manage this study in coordination with Nevada County Connects, the Cities of Nevada City and Grass Valley, key stakeholders, and residents to capture the vision that most successfully explores the relationships between effective transit and land-use, population growth and employment patterns, as well as social equity and areas of high transit need. The COA will generate recommendations based on extensive data analysis, public outreach, and industry best practices for deploying various public transportation modes and integrating with the Statewide Transit and Rail Plans, and the COA shall consider an entire spectrum of service options ranging from minor modifications to a full “reset” of the system. These options may include traditional fixed route service, dial-a-ride service, micro-transit service, micromobility options, and/or a combination to address the challenges of meeting the transit needs outside the fixed route/ADA service areas and outlying communities.

Previous Work:
• Western Nevada County Transit Development Plan, June 2021.

Additional/Continuing Work Activities:

Project Administration:
• Project support and administration of grant. (NCTC/Consultant) (FTA/RPA) • Project meetings and coordination. (NCTC/Consultant) (FTA/RPA) • Project Advisory Committee (PAC) activities. (NCTC/Consultant) FTA/RPA) • Public outreach activities. (NCTC/Consultant) (FTA/RPA) Consultant Procurement:
• NCTC staff prepare and distribute a Request for Proposals to qualified consultants to prepare the COA. (NCTC)
• NCTC review proposals, select consultant, and execute contract to prepare the COA. (NCTC) Existing Conditions:
• Provide project initiation and baseline information/data collection. (NCTC/Consultant) May 2025 Analysis:
• Provide analysis for fixed assets; vehicle fleet; operations; community services; rural routes; dial-a-ride; volunteer driving program; service models; and mobility hubs. (Consultant) January 2026.

Public Outreach:
• Outreach will be conducted through on-board/on-line surveys, meetings, workshops, focus groups, interviews, and outreach directly to key social service agencies, church. This outreach plan will be adjusted as conditions permit. (NCTC/Consultant) July 2026 Advisory Committee meetings:
• The development of an advisory committee to beneficial to the development of the COA and enhance Nevada County Transit’s long-term relationship with the many communities it serves. (NCTC/ Consultant) Page 58
Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 15 WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Draft and Final COA:
• The Draft and Final plans will aggregate the data and recommendations from the COA development process including any public comments; the operational analysis; suggested service alternatives; cost analysis of service recommendations; and the financing and implementation plan. (NCTC/Consultant) (January 2027)
Board Review/Approval:
• The COA will be presented to the Board of Supervisors and NCTC Commission for both Boards to adopt the COA and support the timely implementation of the COA recommendations. (NCTC/Consultant) (May 2027)
Products:
• Existing Conditions Working paper (May 25)
• Financial Plan (Jan 26)
• Draft Comprehensive Operational Analysis COA (Nov 26) • Final Comprehensive Operational Analysis COA (Jan 27) Budget 2.3.4
Revenues:

LTF $8,608.35
RPA Formula $31,319.65
Strategic Partnership Grant
(FTA 5304)
$170,000.00
Total $209,928.00
Expenditures:

Staff $39,928.00
Consultant $170,000.00
Total $209,928.00

Page 59 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 16 WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.4 - Coordination of Regional Planning
Purpose: Enhance NCTC's regional planning efforts through the following activities:
• Coordinate local land use planning with regional transportation planning. • Analyze regional transportation impacts of proposed development projects, including VMT. • Improve Transportation Systems Management (TSM) and Transportation Demand Management (TDM) efforts in the region.
• Provide for Commission participation in studies done by other agencies. • Promote cooperation between regional planning agencies. • Promote regional transportation services (e.g. connections to Capitol Corridor rail service). • Participate and coordinate in regional evacuation planning efforts.

Previous Work:
• Review of local development projects and environmental documents. • Traffic model analyses of development projects, and modifications to regional and local transportation facilities proposed by public agencies.
• Study to extend Capitol Corridor train service to Truckee/Tahoe area. • Participate in the SR 49 Corridor Study with Placer County Transportation Planning Agency (PCTPA) and Caltrans.
• Participate in the Tahoe Gateway Intelligent Transportation Study. • Coordinate with Placer County, PCTPA, Nevada County, and Caltrans as a Technical Advisory Committee for the SR 49 Corridor Study.
• Coordinate with Caltrans, SACOG, El Dorado Transportation Commission, Sierra County Transportation Commission, and Placer County Transportation Planning Agency to update and maintain the Tahoe Gateway ITS Regional Architecture.
• Participate with Caltrans and RTPAs to pursue rail projects that will improve goods movement and enhance passenger rail service.
• Work with the Northern Sierra Air Quality Management District (NSAQMD) to develop and implement transportation control measures consistent with the region's air quality non-attainment plan and Regional Transportation Plan.
• In conjunction with PCTPA and Caltrans, actively pursue, develop, and implement funding for SR 49 corridor improvements.
• Participate as a member of the Tahoe Gateway Architecture Maintenance Team. • Coordinate with member agencies to reestablish and enhance Transportation Demand Management (TDM) programs in Nevada County.
• Assist with modeling and traffic analyses as requested by jurisdictions and approved by NCTC. • Analyze transportation impacts of development proposals. • Analyze proposed modifications to city and county land use plans. • Participate in the North State Super Region “North State Transportation for Economic Development Study.”
• Reviewupdates oftheCirculation andLand UseElements of General Plansfor NevadaCounty, cities of Grass Valley and Nevada City, and the Town of Truckee to ensure consistency with the adopted Airport Land Use Compatibility Plans (ALUCPs) for the Nevada County and Truckee Tahoe airports.
• Participate in inter-regional planning projects (e.g. North State Super Region (NSSR), I-80 Corridor Management Plan, and Trans-Sierra Transportation Coalition). • Participated with PCTPA and Caltrans to develop update of Sacramento to Reno Passenger Rail Service Planning Study – Truckee/Tahoe/Reno

Page 60 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 17 WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.4 - Coordination of Regional Planning (continued) Additional/Continuing Work:
• Participate in Regional Transportation Planning Agency group meetings and California Rural Counties Task Force meetings. (NCTC) (LTF)
• Participate in Federal and State Clean Air Act transportation related air quality planning activities. (NCTC) (LTF)
• Participate in the Truckee/North Tahoe Transportation Management Association (TNT/TMA) and Resort Triangle Transportation Planning Coalition (RTTPC) meetings. (NCTC) (LTF) • Review and comment on Caltrans Systems Plans and related documents. (NCTC) (LTF) • Coordination with the Nevada County Economic Resource Council. (NCTC) (LTF) • Monitor planning efforts in Grass Valley, Nevada City, Nevada County, Truckee. (LTF) • Present information to local civic groups regarding regional transportation planning. (NCTC) (LTF) • Participate in local ad hoc committees. (NCTC) (LTF)
• Maintain formal consultation with Native American Tribal Governments. (NCTC) (LTF) • Maintain formal consultation with the U.S Forest Service & Bureau of Land Management. (NCTC) (LTF)
• Monitor implementation of the Nevada County Active Transportation Plan. (NCTC) (LTF) • Participate in the “Zero Traffic Fatalities Task Force”. (NCTC) (LTF) • Participate in Critical Freight Corridors Working Group. (NCTC) (LTF) • Participate in SR 49 Stakeholders Committee. (NCTC) (LTF) • Distribute press releases. (NCTC) (LTF)
• California Local Streets and Roads Needs Assessment Oversight Committee Participation. (NCTC) (LTF)
• Coordinate with partner agencies to implement the federal performance-based approach in the scope of the transportation planning process. (NCTC) (LTF) • Participate in the California Federal Programming Group (CFPG). (NCTC) (LTF) • Participate in the Transportation Cooperative Committee. (NCTC) (LTF) • Participate on the Truckee Transit Center Study Project Advisory Committee. (NCTC) (LTF) • Coordinate with local jurisdictions in the identification of pedestrian and bicycle projects that meet the requirements for Active Transportation Program grant funding and plan to resubmit grant applications. (NCTC) (LTF)
• Coordinate with partners to identify policies, strategies, programs, and actions that enhance the movement of people, goods, services and information on the regional, interregional, and state highway systems. (NCTC) (LTF)
• Participate in Interregional Transportation Strategic Plan (ITSP) Workshops. (NCTC) (LTF) • Participate in Federal Rescission working group. (NCTC) (LTF) • Participate with North Tahoe SSTAC and Placer County SSTAC in coordination of unmet needs hearings. (NCTC) (LTF)
• Participate in the preparation of the SR 49 Comprehensive Multimodal Corridor Plan (CMCP). (NCTC) (LTF)
• Participate on the Project Advisory Committee for the SR 49 Safety Assessment. (NCTC) (LTF) • Participate with CalSTA in development and implementation of the Climate Action Plan for Transportation Infrastructure (CAPTI). (NCTC) (LTF)
• Coordinate with California State Association of Counties and Rural County Representatives of California regarding transportation policy. (NCTC) (LTF) • Participate in quarterly meetings of the Trans-Sierra Transportation Coalition. • Coordinate with Western Region Institute of Transportation Engineers on development of Induced Demand White Paper. (NCTC) (LTF)
• Participate and coordinate evacuation planning with the Nevada County Office of Emergency Services, Nevada County Sheriff’s Department, CAL FIRE NEU, California Highway Patrol, and other local emergency responders. (NCTC) (LTF) Page 61 Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 18 WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.4 - Coordination of Regional Planning (continued) • Outreach regarding Rural Induced Demand
Products:
• Reports regarding participation in regional coordination activities (e.g. Zero Traffic Fatalities Task Force, Critical Freight Corridors Working Group, ITSP Workshops, Sacramento to Reno Passenger Rail Service Planning Study – Truckee/Tahoe/Reno, and Critical Freight Corridors Working Group). (Bimonthly)
• Reports on coordination with the Nevada County Economic Resource Council. (Bimonthly) • Reports on SR 49 Corridor improvements. (Bimonthly)
• Reports to the Commission regarding North State Super Region meetings and activities. (Bimonthly)
• Reports regarding RTPA and RCTF meetings. (Bimonthly) • Reports regarding TNT/TMA and RTTPC activities. (Bimonthly) Budget 2.4
Revenues:

LTF $36,412.50
RPA Formula $117,556.40
RSTP $30,000.00
Total $183,968.90
Expenditures:

Staff $117,556.40
Indirect $35,612.50
Consulting $30,000.00
Statewide Local Streets and Roads $800.00
Total $183,968.90
Totals may not equal addition of amounts in columns due to rounding Indirect costs are paid with local funds (see Budget Table 5).

Page 62 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 19 WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.4.2 – Airport Land Use Commission Planning and Reviews Purpose: Enhance NCTC's regional planning efforts through the following activities:
• Coordinate local land use planning with airport land use compatibility plans. • Promote cooperation between land use planning agencies and airport land use commissions. • Conduct reviews of projects near Nevada County and Truckee Tahoe Airport for consistency with adopted ALUCPs.
• Provide staff support to Nevada County and Truckee Tahoe Airport Land Use Commissions. • Participate in statewide ALUC meetings.

Previous Work:
• Review airport land use compatibility issues.
• Conduct reviews of projects near Nevada County and Truckee Tahoe Airport for consistency with adopted ALUCPs. (ALUC Fees, LTF)
Additional/Continuing Work:
• Review airport land use compatibility issues.
• Conduct reviews of projects near Nevada County and Truckee Tahoe Airport for consistency with adopted ALUCPs. (ALUC Fees, LTF)
Products:
• Reports on airport land use compatibility issues. (Ongoing) Budget 2.4.2
Totals may not equal addition of amounts in columns due to rounding Revenues:

LTF $19,226.92
ALUC Fees $15,000.00
Total $34,226.92
Expenditures:

Staff $19,226.92
ALUC Reviews $15,000.00
Total $34,226.92

Page 63 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 20 WORK ELEMENT 2 - REGIONAL TRANSPORTATION PLANNING (continued) Project 2.4.3 – Zion St. Mobility/School Access Study
Purpose: The Zion St. corridor in Nevada City is heavily used by vehicular, pedestrian, and bicycle traffic due to three schools in the vicinity. This project will analyze cost-effective improvements in the Zion Street Corridor related to improving safety and pedestrian and bicycle connectivity to school facilities. The need for improvements in this corridor are identified in the 2019 Nevada County Active Transportation Plan. This project is being funded with a FY 2023/24 RPA Grant.

Previous Work:

No previous work.

Project Work Activities:
• Prepare and distribute a Request for Proposal to qualified consultants (RPA) (NCTC) • Review proposals, select consultant, and execute a contract (RPA) (NCTC/Consultant) • Finalize the work program and refine the scope of work (RPA) (NCTC/Consultant) • Project meetings and coordination (RPA) (NCTC/Consultant) • Public Outreach (RPA) (NCTC/Consultant)
• Project Advisory Committee activities (RPA) (NCTC)
• Project support and administration of grant (RPA) (NCTC) • Prepare quarterly reports and invoices (RPA) (NCTC)
• Project initiation and data collection (RPA) (NCTC/Consultant) • Develop potential improvement alternatives (RPA)
• Prepare Draft Report (RPA)
• Public workshops (RPA)
• Prepare Final Report (RPA)
Products:
• Consultant Procurement Process (Sep 24)
• Consultant Contract (Jan 25)
• Administrative Draft Report (Sep 25)
• Draft Report (Nov 25)
• Final Report (Mar 26)
Budget 2.4.3
Revenues:

RPA Grant Carryover $199,998.20
RPA Formula $30,542.92
Total $230,541.12
Expenditures:

Staff $30,542.92
Consultant $199,998.20
Total $230,541.12

Page 64 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 21 WORK ELEMENT 2 – REGIONAL TRANSPORTATION PLANNING (continued) Project 2.4.5 – Rural Counties Task Force Chair Activities Purpose: To coordinate the participation of the twenty-six Rural Transportation Planning Agencies (RTPA) in the statewide issues pertinent to transportation planning, programming, and funding. This work element is in the first year of a two-year NCTC planning effort. This work element provides the resources necessary for the NCTC Deputy Director to fulfill the responsibilities of Chair of the Rural Counties Task Force (RCTF). The RCTF is an advisory committee to the California Transportation Commission (CTC). The RCTF provides a forum for the RTPAs in California to coordinate information, discuss issues, and present their unique perspective and input into the statewide decision-making process. In addition, the RCTF provides a venue to pool financial and knowledge-based resources. The Chair position provides access to policy makers from state government putting the rural counties, including NCTC, in a unique position to protect and enhance our projects and funding.

Previous and Continuing Work:
• Participate in RTPA group meetings and California RCTF meetings.

Additional Work Activities:
• Develop, organize, and distribute the RCTF meeting agendas. (NCTC) (Bi-Monthly) • Represent the RCTF at ad hoc and standing Caltrans and CTC policy and technical advisory committees. (NCTC) (Ongoing)
• Represent the RCTF at government forums and workshops. (NCTC) (As needed) • Represent the RCTF at CTC meetings and workshops. (NCTC) (Monthly) • Coordinate efforts and provide technical assistance on transportation issues with the Regional Council of Rural Counties, California State Association of Counties, and League of California Cities. (NCTC) (Ongoing)
• Communicate with RCTF members on issues of shared interest, such as policy and procedural changes or funding opportunities. (NCTC) (Ongoing)
Products:
• RCTF agendas. (Bi-Monthly or as needed)
• RCTF Bi-Monthly reports and annual report to the CTC. (Ongoing) • Correspondence and communications to Caltrans, California Transportation Commission, Regional Council of Rural Counties, California State Association of Counties, and League of California Cities. (As needed)
• Billings to RCTF member agencies for voluntary dues. (January 25) Budget 2.4.5
Revenues:

RCTF Dues $36,853.81
Total $36,853.81
Expenditures:

Staff $21,853.81
RCTF Travel $15,000.00
Total $36,853.81

Page 65 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 22 WORK ELEMENT 2 – REGIONAL TRANSPORTATION PLANNING (continued) Project 2.4.5a –CARL Administration
Purpose: The California Academy for Regional Leaders (CARL) supports participants in their efforts to strengthen their organizations and increase their personal effectiveness by helping them develop leadership skills, expand their knowledge of the systems that impact their agencies, and build state-wide professional networks.

Previous Work: No Previous Work, this is a new project.

Work Activities:

Utilizing RPA Grant funds, the Rural Counties Task Force Chairman will identify candidates for the CARL program.

Products:

Billings to CALCOG to enable RCTF members to participate in the CARL program on scholarship. (Annually)
Budget 2.4.5a
Revenues:

FY 24/25 RPA Grant $25,000.00
Total $25,000.00
Expenditures:

CARL Scholarships $25,000.00
Total $25,000.00

Page 66 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 23 WORK ELEMENT 2 – REGIONAL TRANSPORTATION PLANNING (continued) Project 2.4.5b – Rural Counties Task Force Administrative Guidebook and Training Purpose: Prepare an update to the RCTF Administrative Guidebook first developed in 2015 and updated in 2022.

Previous Work: In 2015 the RCTF contracted preparation of an Administrative Guidebook for rural California counties. The Guidebook included sections on: Administration, Accounting systems, Procurement, Employee Handbooks, and Personnel Policies and Procedures.

Work Activities: Contract for preparation of an update to the RCTF Administrative Guidebook. The contract will include provision of training by the consultant on use of the guidebook to RCTF members that request that assistance.

Products:
• Draft Guidebook (Feb 2026)
• Final Guidebook (May 2026)
Budget 2.4.5b
Revenues:

RPA Grant FY25/26 $13,240.00
Total $13,240.00
Expenditures:

Consulting $13,240.00
Total $13,240.00
Totals may not equal addition of amounts in columns due to rounding

Page 67 ends

Item # 5.

NCTC 2025/26 Draft Overall Work Program – March 2025 24 WORK ELEMENT 3 - CALTRANS ACTIVITIES WITH NCTC FR FY 2023/24

ACTIVITY DESCRIPTION PRODUCTS
System Planning Completion of system planning
products used by Caltrans and its
transportation partners
Caltrans District 3 System
Planning documents consistent
with the Caltrans District 3
System Planning Five-Year Work
Plan.

Advance Planning Completion of pre-programming
studies (e.g., Project Initiation
Documents) so as to be ready to
program resources for capital
projects
Project Initiation Documents
(PID), as indicated in the TwoYear PID Work Plan.

Regional Planning Participate in and assist with
various regional planning projects
and studies
Participation in the following
projects and studies:
• Rural Counties Task Force Rural
Induced Demand Study
• SR 49 CSMP Update
• Assisting with SR 49 TCEP, SCCP,
RAISE, Rural Surface
Transportation Program Grant
Applications
• Oversight of Planning Studies/
Conceptual Projects pertaining to the
State Highway System
Local Development Review
Program
Review of local development
proposals potentially impacting
the State Highway System
Assistance to lead agencies to
ensure the identification and
mitigation of local development
impacts to the State Highway
System that is consistent with the
State’s smart mobility goals.

Page 68 ends

Item # 5.

Glossary of Terms and Acronyms
Active Transportation Plan: Identifies a network of pedestrian and bicycle facilities and projects to support pedestrian and bicycle safety for people of all ages and abilities. Specifically, the Active Transportation Plan aims to:
• Identify barriers and innovative solutions to encourage walking and bicycling as viable travel modes • Effectively build on recently completed and current active transportation planning efforts • Develop walking/bicycling networks supportive of existing and future land uses and projects • Develop a clearly defined implementation strategy with specific, creative, yet practical and financially feasible projects matched to specific funding opportunities Active Transportation Program (ATP): Created in 2013 by the passage of SB 99 and AB 101, the Active Transportation Program consolidates existing federal and state transportation programs into a single program with a focus to make California a national leader in active transportation. The purpose of the Active Transportation Program is to encourage increased use of active modes of transportation by achieving the following goals:
• Increase the proportion of trips accomplished by biking and walking, • Increase safety and mobility for non-motorized users, • Advance the active transportation efforts of regional agencies to achieve Greenhouse Gas (GHG) reduction goals, pursuant to SB 375 (of 2008) and SB 341 (of 2009), • Enhance public health and ensure that disadvantaged communities fully share in the benefits of the program, and
• Provide a broad spectrum of projects to benefit many types of active transportation users.

Airport Land Use Commission (ALUC): The fundamental purpose of ALUCs is to promote land use compatibility around airports. As expressed in state statutes, this purpose is “… to protect public health, safety, and welfare by ensuring the orderly expansion of airports and the adoption of land use measures that minimize the public’s exposure to excessive noise and safety hazards within areas around public airports to the extent that these areas are not already devoted to incompatible uses.” The statutes give ALUCs two principal powers by which to accomplish this objective:

1. ALUCs must prepare and adopt an airport land use plan; and

2. ALUCs must review the plans, regulations, and other actions of local agencies and airport operators for consistency with that plan.

Airport Land Use Compatibility Plan (ALUCP): A document referred to by ALUCs and individuals seeking to review standards for land use planning in the vicinity of an airport. The ALUCP defines compatible land uses for noise, safety, airspace protection, and overflight within the Airport Influence Area (AIA).

Allocation: A distribution of funds by formula or agreement. With regard to Transportation Development Act funds, allocation is the discretionary action by the RTPA which designates funds for a specific claimant for a specific purpose.

Apportionment: Distribution of funds by a formula. Apportionment under the Transportation Development Act is the determination by the RTPA of each area’s share of anticipated LTF for the ensuing fiscal year.

California Environmental Quality Act (CEQA): A statute that requires state and local agencies to identify the significant environmental impacts of their actions and to avoid or mitigate those impacts, if feasible.

Capital Improvement Program (CIP) or Capital Improvement Plan: A short-range plan, which identifies capital projects and equipment purchases, provides a planning schedule and identifies options, for financing the plan.

Page 69 ends

Item # 5.

Congestion Mitigation and Air Quality (CMAQ): A federal funding program that is available in western Nevada County for transportation projects that demonstrate emission reductions to help attain federal air quality standards. Western Nevada County was classified in 2004 as “non-attainment” for 8- hour ozone standards. Project categories eligible for CMAQ funding include:
• Alternative fuels and vehicles
• Congestion reduction and traffic flow improvements
• Transit improvements
• Bicycle and pedestrian facilities
• Public education and outreach
• Diesel engine retrofits
• Carpooling and vanpooling
Projects are submitted by local jurisdictions for consideration and are ranked based on air quality benefits and project readiness. NCTC then reviews the ranking and chooses projects to be funded.

Corridor System Management Plan (CSMP): Foundational documents supporting a partnership-based, integrated management of all travel modes (cars, trucks, transit, bicycles, and pedestrians) and infrastructure (highways, roads, rail tracks, information systems and bike routes) so that mobility along a corridor is provided in the most efficient and effective manner possible.

Federal Highway Administration (FHWA): An agency within the U.S. Department of Transportation that supports state and local governments in the design, construction, and maintenance of the Nation's highway system (Federal Aid Highway Program) and various federally and tribal owned lands (Federal Lands).

Federal Transit Administration (FTA): A federal agency that provides financial and technical assistance to local public transit systems, including buses, subways, light rail, commuter rail, trolleys and ferries.

Findings of Apportionment: Prior to March 1 of each year, Nevada County Transportation Commission (NCTC), pursuant to the California Code of Regulations Section 6644, transmits “Findings of Apportionment” for all prospective claimants. The apportionments are determined from the Nevada County Auditor-Controller's estimate of Local Transportation Funding (LTF) for the ensuing fiscal year, less those funds allocated for Transportation Development Act (TDA) administration, transportation planning and programming, pedestrian/ bicycle projects, and community transit services. The remaining funds are then apportioned according to the population of each applicant's jurisdiction in relation to the total population of the County.

Fixing America’s Surface Transportation (FAST) Act: A federal law enacted in 2015 to provide longterm funding for surface transportation infrastructure planning and investment. The FAST Act authorizes $305 billion over fiscal years 2016 through 2020 for highway, highway and motor vehicle safety, public transportation, motor carrier safety, hazardous materials safety, rail, and research, technology, and statistics programs.

FTA Section 5310: This program set forth in United States Code (U.S.C.) Title 49 Section 5310 provides formula funding to statesfor the purpose of assisting private nonprofit groupsin meeting the transportation needs of older adults and people with disabilities when the transportation service provided is unavailable, insufficient, or inappropriate to meeting these needs.

FTA Section 5311: This program set forth in United States Code (U.S.C.) Title 49 Section 5311 provides grants for Rural Areas providing capital, planning, and operating assistance to states to support public transportation in rural areas with populations of less than 50,000 where many residents often rely on public transit to reach their destinations.

Interregional Transportation Improvement Program (ITIP): The ITIP is a five-year program of projects funded through the State Transportation Improvement Program (STIP) that obtains funding primarily through the per-gallon State tax on gasoline. The ITIP is prepared by the California Department of Transportation (Caltrans) and is submitted to the California Transportation Commission (CTC) for approval.

Page 70 ends

Item # 5.

Level of Service (LOS): A qualitative measure used to relate the quality of traffic service. LOS is used to analyze highways by categorizing traffic flow and assigning quality levels of traffic based on performance measures like speed, density, etc. North American highway LOS standards use letters A through F, with A being the best and F being the worst, similar to academic grading.

Local Transportation Fund (LTF): The LTF is derived from a 1/4-cent general sales tax collected statewide. The State Board of Equalization, based on the sales tax collected in each county, returns the sales tax revenues to each county’s LTF. The LTF was created in 1971when legislation was passed to provide funding to counties for transit and non-transit related purposes.

Memorandum of Understanding (MOU): An agreement between two (or more) parties. It expresses a convergence of will between the parties, indicating an intended common line of action. Many government agencies use MOUs to define a relationship between agencies.

Metropolitan Planning Organization (MPO): MPOs are the regional planning entities in urbanized areas, usually an area with a population of 50,000 or more. There are 18 MPOs in California, accounting for approximately 98% of the state’s population.

Nevada County Airport Land Use Commission (NCALUC): The Nevada County Transportation Commission was designated by the Nevada County Board of Supervisors and the city selection committee as the ALUC for the Nevada County Airport in May 2010. The NCTC Executive Director serves as the NCALUC Executive Director with support from the NCTC staff.

Nevada County Airport Land Use Compatibility Plan (NCALUCP): The basic function of this plan is to promote compatibility between the airport and surrounding land uses. The plan serves as a tool for use by the NCALUC in fulfilling its duty to review airport and adjacent land use development proposals.

Additionally, the plan sets compatibility criteria applicable to local agencies and their preparation or amendment of land use plans and ordinances and to land owners in their design of new developments.

North State Super Region (NSSR): Regional transportation planning agencies from 16 counties in Northern California came together on October 20, 2010, to sign a memorandum of agreement. This agreement created an alliance between the agencies to work together and support each other on issues related to transportation and to have a unified voice representing the North State.

Northern Sierra Air Quality Management District (NSAQMD): The Northern Sierra Air Quality Management District was formed in 1986 by the merging of the Air Pollution Control Districts of Nevada, Plumas and Sierra Counties. The District is required by state law to achieve and maintain the federal and state Ambient Air Quality Standards, which are air quality standards set at levels that will protect public health. The District is composed of three primary entities, each with a specific purpose: District staff, Governing Board of Directors, and Hearing Board.

Overall Work Program (OWP): NCTC annually adopts a budget through the preparation of an Overall Work Program. This work program describes the planning projects and activities or work elements that are to be funded, and the type of funds that will pay for the expenditures.

Planning, Programming, and Monitoring (PPM): PPM is funding allocated by the California Transportation Commission (CTC) through the State Transportation Improvement Program (STIP).

Designated uses of PPM include:
• Regional transportation planning – includes development and preparation of the regional transportation plan;
• Project planning – includes the development of project study reports or major investment studies conducted by regional agencies or by local agencies, in cooperation with regional agencies;
• Program development – includes the preparation of regional transportation improvement programs (RTIPs) and studies supporting them; and
• Monitoring the implementation of STIP projects – includes project delivery, timely use of funds, and compliance with state law and CTC guidelines.

Plans, Specifications, and Estimates (PS&E): In this stage of project development, the scope of the selected alternative is refined; design surveys and photogrammetric mapping is obtained; and reports including traffic data, hydrology and hydraulics, geotechnical design, pavement design, and materials and sound wall design reports are completed. Final right-of-way requirements are determined, and procurement is initiated. At the completion of the PS&E stage, a complete set of project plans have been developed that will allow a competent contractor to bid and build the project. These plans include a refined estimate of the construction costs and any required specifications on how the work is to proceed.

Page 71 ends

Item # 5.

Project Approval and Environmental Documentation (PA/ED): The PA/ED step of project development reinforces the philosophy of balancing transportation needs with community goals and values. Outputs of the PA/ED step are the project report and environmental document. The project report is an engineering document that evaluates the various alternatives for selection of a preferred alternative.

The environmental document is a disclosure document that assesses the potential impacts of the project on the environment.

Project Initiation Document (PID): a report that documents the purpose, need, scope, cost, and schedule for a transportation project. The PID identifies and describes the viable alternatives to a transportation problem.

Project Study Report (PSR): A report of preliminary engineering efforts, including a detailed alternatives analysis, cost, schedule, and scope information for a transportation project. A PSR also includes estimated schedule and costs for environmental mitigation and permit compliance.

Public Transportation Modernization Improvement & Service Enhancement Account (PTMISEA): PTMISEA was created by Proposition 1B, the Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006. Of the $19.925 billion available to Transportation, $3.6 billion dollars was allocated to PTMISEA to be available to transit operators over a ten-year period.

PTMISEA funds may be used for transit rehabilitation, safety or modernization improvements, capital service enhancements or expansions, new capital projects, bus rapid transit improvements, or rolling stock (buses and rail cars) procurement, rehabilitation or replacement. Funds in this account are appropriated annually by the Legislature to the State Controller’s Office (SCO) for allocation in accordance with Public Utilities Code formula distributions: 50% allocated to Local Operators based on fare-box revenue and 50% to Regional Entities based on population.

Regional Improvement Program (RIP): The RIP is one of two funding programs in the State Transportation Improvement Program (STIP). The RIP receives 75% of the STIP funds and the second program, the Interregional Improvement Program receives 25% of STIP funds. RIP funds are allocated every two years by the California Transportation Commission (CTC) to projects submitted by Regional Transportation Planning Agencies (RTPAs) in their Regional Transportation Improvement Programs (RTIPs).

Regional Surface Transportation Program (RSTP): The RSTP was established by the State of California to utilize federal Surface Transportation Program funds for a wide variety of transportation projects. The State exchanges these federal funds for less restrictive state funds to maximize the ability of local agencies to use the funds for transportation purposes including planning, construction of improvements, maintenance and operation of public streets, and pedestrian and bicycle projects.

Regional Transportation Improvement Program (RTIP): NCTC submits regional transportation projects to the California Transportation Commission (CTC) for funding in a list called the RTIP. The RTIP is a five-year program that is updated every two years. Projects in the RTIP are funded from the Regional Improvement Program (RIP).

Regional Transportation Mitigation Fee (RTMF): The Western Nevada County Regional Transportation Mitigation Fee Program was established in 2001 through a partnership of Nevada County, City of Nevada City, City of Grass Valley, and the Nevada County Transportation Commission (NCTC).

The RTMF Program was developed to collect impact fees from new development to help fund transportation improvement projects needed to accommodate growth in the region of western Nevada County.

Regional Transportation Plan (RTP): The Regional Transportation Plan has been developed to document transportation policy, actions, and funding recommendations that will meet the short- and longterm access and mobility needs of Nevada County residents over the next 20 years. This document is designed to guide the systematic development of a comprehensive multi-modal transportation system for Nevada County.

Regional Transportation Planning Agency (RTPA): County or multi-county entities charged by state law in meeting certain transportation planning requirements. As the RTPA for Nevada County, NCTC coordinates transportation planning for Grass Valley, Nevada City, Nevada County, and the Town of Truckee. Page 72
Item # 5.

Request for Proposal (RFP): A document that solicits proposals, often made through a bidding process, by an agency or company interested in procurement of a commodity, service, or valuable asset, to potential suppliers to submit business proposals.

Rural Counties Task Force (RCTF): There are 26 rural county Regional Transportation Planning Agencies (RTPAs) or Local Transportation Commissions represented on the Rural Counties Task Force (RCTF). The RCTF is an informal organization with no budget or staff that generally meets every other month. A member of
the CTC, usually acts as liaison to the RCTF, and CTC and Caltrans staff typically attend these meetings to explain and discuss changing statewide transportation issues that may be of concern to the rural counties.

Rural Planning Assistance (RPA): Annually the 26 rural RTPAs receive state transportation planning funding, known as RPA, on a reimbursement basis, after costs are incurred and paid for using local funds.

Social Services Transportation Advisory Council (SSTAC): Consists of representatives of potential transit users including the general public, seniors and/or disabled; social service providers for seniors, disabled, and persons of limited means; local consolidated transportation service agencies; and Truckee residents who represent the senior and Hispanic communities. The SSTAC meets at least once annually and has the following responsibilities:
• To maintain and improve transportation services to the residents of Nevada County, particularly the elderly and disabled.
• Review and recommend action to the NCTC relative to the identification of unmet transit needs and advise the Commission on transit issues, including coordination and consolidation of specialized transportation services.
• Provide a forum for members to share information and concerns about existing elderly and handicapped transportation resources.

State Highway Operations and Protection Program (SHOPP): The SHOPP is a four-year listing of projects prepared by Caltrans.

State Transit Assistance (STA): These funds are provided by the State for the development and support of public transportation needs. They are allocated by the State Controller’s Office to each county based on population and transit performance.

State Transportation Improvement Program (STIP): The STIP is a multi-year capital improvement program of transportation projects on and off the State Highway System, funded with revenues from the Transportation Investment Fund and other funding sources. STIP programming generally occurs every two years. The STIP has two funding programs, the Regional Improvement Program and the Interregional Improvement Program.

Technical Advisory Committee (TAC): The Technical Advisory Committee (TAC) is made up of representatives of local public works and planning departments, Caltrans District 3, public airport operators, the air pollution control district, public transit operators, and the NCTC consultant engineer on retainer. Members are assigned by staff of local jurisdictions and other participating organizations. Any decisions made or actions proposed by the TAC shall be subject to the review and approval of the NCTC.

TAC responsibilitiesinclude:
• Provide technical input, assistance, and recommendations to the Commission to ensure there is comprehensive coordination and cooperation in the transportation planning process for Nevada County.
• Review and comment on comprehensive regional transportation plans for the area, which include the Regional Transportation Plan (RTP), the Regional Transportation Improvement Program (RTIP), and the Overall Work Program (OWP).
• Coordinate efforts and discussions to create and maintain circulation elements of the General Plan and specific plans of the member governments.

Transit Development Plan (TDP): Transit Development Plans study the County’s transit services. They help identify transit service needs, prioritize improvements and determine the resources required for implementing modified or new service. The plans also provide a foundation for requests for State and federal funding,

Page 73 ends

Item # 5.

Transit Services Commission (TSC): This commission oversees and advises as necessary the daily operations of the western Nevada County transit system. The TSC has the following responsibilities:
• Establish fares;
• Adopt the level of transit and paratransit services, including route structure and service areas; • Monitor public response;
• Approve proposed purchase of additional vehicles;
• Review and approve the annual budget for transit and paratransit operations.

Transportation Development Act (TDA): The Transportation Development Act was enacted in 1971 and provides two major sources of funding for public transportation: the Local Transportation Fund (LTF) and the State Transit Assistance fund (STA). The TDA funds a wide variety of transportation programs, including planning and programming activities, pedestrian and bicycle facilities, community transit services, and public transportation projects. One of NCTC’s major responsibilities is the administration of TDA funding in Nevada County.

Travel Demand Model (also Traffic Model): A computer model used to estimate travel behavior and travel demand for a specific future time frame, based on a number of assumptions. In general, travel analysis is performed to assist decision makers in making informed transportation planning decisions.

The strength of modern travel demand forecasting is the ability to ask critical “what if” questions about proposed plans and policies.

Truckee North Tahoe Transportation Management Association (TNT/TMA): The Truckee North Tahoe Transportation Management Association is dedicated to fostering public-private partnerships and resources for the advocacy and promotion of innovative solutions to the unique transportation challenges of the Truckee-North Lake Tahoe Resort Triangle. The TNT/TMA is a planning stakeholder and partner with NCTC.

Truckee Tahoe Airport Land Use Commission (TTALUC): The Truckee Tahoe Airport is an "intercounty" airport situated in both Nevada County and Placer County; therefore, a special ALUC with representatives from both counties was formed. Six members are selected, one each, by Placer and Nevada Counties' Board of Supervisors,City SelectionCommittees, and Airport Managers of each county.

A seventh member is chosen by the other six members to represent the general public. NCTC authorized its staff on May 19, 2010, to provide staff support to the TTALUC.

Truckee Tahoe Airport Land Use Compatibility Plan (TTALUCP): A document referred to by the TTALUC and individuals seeking to review standards for land use planning in the vicinity of the Truckee Tahoe Airport. The plan defines compatible land uses for noise, safety, airspace protection, and overflight.

The TTALUC performs consistency determinations for proposed projects in the area covered by the Compatibility Plan as needed.

Vehicle Miles Traveled (VMT): VMT is a metric of the total milestraveled by vehicles in a defined area over a defined period of time and is often used to estimate the environmental impacts of driving, such as Greenhouse Gases and air pollutant emissions. Factors that influence VMT include travel mode, number of trips, and distance traveled. California jurisdictions are transitioning from a Level of Service (LOS) metric to a Vehicle Miles Traveled (VMT) metric within the California Environmental Quality Act’s (CEQA) transportation analysis.

Page 74 ends

Item # 5.

Table 1
DRAFT Amendment 2
FY 2025/26 FY 2024/25
LTF Administration 703,728.33 776,509.69 -72,781.36
LTF Planning 111,344.77 141,082.89 -29,738.12
LTF Contingency 146,297.62 142,755.59 3,542.03
Rural Planning Assistance (RPA) Formula 466,500.00 294,000.00 172,500.00 Rural Planning Assistance (RPA) Formula Carryover 0.00 19,156.13 -19,156.13 Rural Planning Assistance (RPA) Grants 38,240.00 60,760.00 -22,520.00 Rural Planning Assistance (RPA) G rants Carryover 199,998.20 174,893.58 25,104.62 Regional Transportation Mitigation Fees (RTMF) 7,500.00 7,500.00 0.00 Strategic Partnership Grant (FTA 5304) 170,000.00 170,000.00 0.00 RCTF Dues 36,853.81 36,000.00 853.81
STIP Planning Funds (PPM) 130,283.72 130,283.72 0.00
ALUC Fees 15,000.00 15,000.00 0.00
Regional Surface Transportation Program (RSTP) 30,000.00 33,797.13 -3,797.13 LTF Carryover 0.00 53,851.77 -53,851.77
Senate Bill 125 (SB125) Administration 20,000.00 20,000.00 0.00 TOTAL 2,075,746.45 2,075,590.51 155.94
DRAFT Amendment 2
FY 2025/26 FY 2024/25
Salary 719,915.72 696,973.04 22,942.68
Benefits 236,329.88 231,610.35 4,719.53
Direct (Table 2) 666,088.20 819,787.81 -153,699.61
Indirect (Table 3) 180,010.00 179,180.00 830.00
Contingency 273,402.65 148,039.31 125,363.34
TOTAL 2,075,746.45 2,075,590.51 155.94
Estimated Estimated Difference
Fund Balance FY 2025/26 FY 2024/25
$119,211.17 $119,211.17 $0.00
Revenues
Expenditures Difference
Difference
Budget Summary FY2025/26 OWP DRAFT
NCTC 2025/26 Overall Work Program – DRAFT March 2025 B1

Page 75 ends

Item # 5.

1.1 Intergovernmental Advocacy $52,000.00 $52,000.00 $0.00 LTF

1.1 Human Resources Consulting $5,000.00 $5,000.00 $0.00 LTF

1.2 Fiscal Auditor $60,050.00 $58,190.00 $1,860.00 LTF

1.2 Triennial Performance Audits (completed 24/25) $0.00 $47,020.00 ($47,020.00) LTF

2.1 Traffic Counts $10,000.00 $10,000.00 $0.00 RPA, PPM, LTF

2.1 Transportation Engineering $40,000.00 $40,000.00 $0.00 RPA, PPM, LTF

2.1 Local Agencies Participation in Regional Planning $30,000.00 $30,000.00 $0.00 RPA, PPM, LTF

2.1.1 Regional Transportation Plan Update (consultant work completed in 24/25) $0.00 $17,406.95 ($17,406.95) RPA

2.3.3 Eastern Nevada County Transit Development Plan (consultant work completed in 24/25) $0.00 $8,580.90 ($8,580.90) LTF

2.3.4 Reenvisioning Transit in Western Nev Co. $170,000.00 $170,000.00 $0.00 FTA 5304

2.4 Consultant Prepared ATP Applications $30,000.00 $30,000.00 $0.00 RSTP

2.4 Statewide Local Streets and Roads Needs Assessment $800.00 $800.00 $0.00 LTF

2.4.1 Local Road Safety Plan (completed 24/25) $0.00 $3,061.72 ($3,061.72) RSTP

2.4.2 Airport Land Use Commission Planning & Reviews $15,000.00 $15,000.00 $0.00 ALUC, LTF

2.4.3 Zion St. Mobility/School Access study $199,998.20 $199,998.20 $0.00 PPM & RPA Grant

2.4.4 RCTF Rural Induced Demand Study (consultant work completed in 24/25) $0.00 $61,858.68 ($61,858.68) RPA Grant

2.4.5 Rural Counties Task Force Chairman Travel Mileage Meals Lodging $15,000.00 $17,076.46 ($2,076.46) RCTF Dues

2.4.5a Calcog Academy for Regional Leadership Administration $25,000.00 $25,000.00 $0.00 RPA Grant

2.4.5b Rural Counties Task Force Administrative Manual and Training $13,240.00 $0.00 $13,240.00 RPA Grant

2.4.6 Zero Emission Vehicle Transition Plan for County of Nevada (completed 24/25) $0.00 $28,794.90 ($28,794.90) RPA Grant TOTAL $666,088.20 $819,787.81 ($153,699.61)
Work Element
Table 2
Difference Source 24/25
Amendment 2 DRAFT 25/26
Direct Costs Budget FY 2025/26 OWP Draft
NCTC 2025/26 Overall Work Program – DRAFT March 2025 B2

Page 76 ends

Item # 5.

DRAFT Amendment 2
FY 25/26 FY 24/25

13.2 Nevada County Auditor/Controller $30,000 $30,000 $0 0.00%

13.1 Legal Counsel $15,000 $15,000 $0 0.00%

13.3 TNT/TMA Membership $4,600 $4,600 $0 0.00%

13.21 Website Update/Maintenance $12,670 $11,840 $830 7.01%

13.17 Nevada County ERC Membership $1,000 $1,000 $0 0.00% Insurance $22,250 $22,250 $0 0.00%

1.1 General Liability & Errors and Omissions $18,250 $18,250 $0 0.00%

1.3 Workers' Compensation $4,000 $4,000 $0 0.00%
Office Expenses $32,590 $32,590 $0 0.00%

2.1 Phones $900 $900 $0 0.00%

2.2 Equipment Rental $500 $500 $0 0.00%

2.3 Records Storage $2,000 $2,000 $0 0.00%

2.4 Equipment Maintenance Agreements $1,000 $1,000 $0 0.00%

2.5 Publications/Legal Notices $2,500 $2,500 $0 0.00%

2.6 Janitoral Services $1,500 $1,500 $0 0.00%

2.7 Payroll Service $5,000 $5,000 $0 0.00%

2.8 Supplies $2,500 $2,500 $0 0.00%

2.9 Printing & Reproduction $250 $250 $0 0.00%

2.10 Subscriptions $320 $320 $0 0.00%

2.11 Computer Software & Network Maintenance $11,500 $11,500 $0 0.00%

2.12 Postage $300 $300 $0 0.00%

2.13 Telework Reimbursement $4,320 $4,320 $0 0.00%
3 Equipment $4,800 $4,800 $0 0.00%
Copier/Printer $800 $800 $0 0.00%
Office Furniture $500 $500 $0 0.00%
Laptop /Computer $3,000 $3,000 $0 0.00%
Miscellaneous $500 $500 $0 0.00%
5 Training and Conferences $2,000 $2,000 $0 0.00%
6 Office Lease $28,000 $28,000 $0 0.00%
7 Utilities $3,000 $3,000 $0 0.00%
8 Travel - Meals & Lodging $10,000 $10,000 $0 0.00%
9 Travel - Mileage/Fares/Parking $10,000 $10,000 $0 0.00% 10 Professional & Service Organizations $4,100 $4,100 $0 0.00% TOTAL $180,010 $179,180 $830 0.46%
Table 3
Indirect Costs Budget FY 2025/26 Draft OWP
ACCT ITEM Variance Variance %
NCTC 2025/26 Overall Work Program – DRAFT March 2025 B3

Page 77 ends

Item # 5.

1.1 General Services 350,097.84 7,500.00 357,597.84

1.2 Fiscal Administration 353,630.49 20,000.00 (1) 373,630.49

2.1 Transportation Planning 13,078.99 146,299.25 3,178.69 162,556.93

2.2 Transportation Improvement Program 15,885.40 84,386.11 100,271.51

2.3 Transit & Paratransit Programs 18,132.61 . 56,395.68 74,528.29

2.3.4 Reenvisioning Transit in Western Nev Co. 8,608.35 31,319.65 170,000.00 209,928.00

2.4 Coordination of Regional Planning 36,412.50 117,556.40 30,000.00 183,968.90

2.4.2 Airport Land Use Commission Planning & Reviews 19,226.92 15,000.00 34,226.92

2.4.3 Zion St. Mobility/School Access study 199,998.20 30,542.92 230,541.12

2.4.5 Rural Counties Task Force Chair Activities 0.00 0.00 36,853.81 (2) 36,853.81

2.4.5a Calcog Academy for Regional Leadership Administration 0.00 25,000.00 25,000.00

2.4.5b Rural Counties Task Force Admin Manual and Training 0.00 13,240.00 0.00 0.00 13,240.00 Contingency 133,225.90 13,071.72 127,105.03 273,402.65
Totals 948,299.00 13,071.72 38,240.00 199,998.20 466,500.00 0.00 15,000.00 7,500.00 130,283.72 30,000.00 170,000.00 56,853.81 2,075,746.45 Totals may not equal addition of amounts in columns due to rounding. SB125 Admin (1) RCTF Dues (2) S/B 36,500
LTF
Carryover 25/26 LTF RPA Grants RPA Grant
Carryover RPA Formula
Table 4
Work Element TOTAL RPA Formula
Carryover ALUC Fees RTMF STIP Planning PPM
Revenues - FY 2025/26 DRAFT OWP
RSTP
Strategic
Partnerrship
Grant
(FTA 5304)
Other
NCTC 2025/26 Overall Work Program – DRAFT March 2025 B4

Page 78 ends

Item # 5.

Expenditures - FY 2025/26 DRAFT OWP
PY Staff Indirect Transportation
Engineering Consulting Total

1.1 General Services 1.69 252,975.97 47,621.87 57,000.00 (1) 357,597.84

1.2 Fiscal Administration 1.63 263,901.86 49,678.63 60,050.00 (2) 373,630.49

2.1 Transportation Planning 0.35 69,477.94 13,078.99 40,000.00 40,000.00 (3) 162,556.93

2.2 Transportation Improvement Program 0.40 84,386.11 15,885.40 100,271.51

2.3 Transit & Paratransit Programs 0.28 56,395.68 18,132.61 74,528.29

2.3.4 Reenvisioning Transit in Western Nev Co. 0.00 39,928.00 170,000.00 209,928.00

2.4 Coordination of Regional Planning 0.55 117,556.40 35,612.50 30,000.00 (4) 800.00 (4) 183,968.90

2.4.2 Airport Land Use Commission Planning & Reviews 0.10 19,226.92 15,000.00 34,226.92

2.4.3 Zion St. Mobility/School Access study 0.14 30,542.92 199,998.20 230,541.12

2.4.5 Rural Counties Task Force Chair Activities 0.00 21,853.81 15,000.00 (5) 36,853.81

2.4.5a Calcog Academy for Regional Leadership Admin. 25,000.00 (5) 25,000.00

2.4.5b Rural Counties Task Force Admin Manual and Training 0.00 13,240.00 13,240.00 Contingency 273,402.65 273,402.65
TOTAL 5.48 956,245.60 180,010.00 40,000.00 485,238.20 40,000.00 374,252.65 2,075,746.45 Notes:
(3) $10,000 Traffic Counts, Local Agency (WE 2.1): Nev. Co. $7,500; Truckee $7,500; Nevada City $7,500; Grass Valley $7,500. (4) $30,000 ATP Application preparation, $800 Statewide Local Streets and Roads (5) $15,000 RCTF Travel Expense; $25,000 RCTF CALCOG Leadership Academy Indirect Costs are paid with local funds, no RPA or STIP planning funds are used.

Table 5
Work Elements Local Agency Other
(2) $60,050 Fiscal Audit Contract
Totals may not equal addition of amounts in columns due to rounding. (1) $52,000 Intergovernmental Advocacy, $5,000 Human Resources Consulting NCTC 2025/26 Overall Work Program – DRAFT March 2025 B5

Page 79 ends

Item # 5.

ACCT Table 6 Budget Detail FY 2025/26 DRAFT OWP ALLOCATION 1 Insurance 22,250.00

1.1 General Liability & Errors and Omissions 18,250.00

1.3 Workers' Compensation 4,000.00
2 Office Expenses 32,590.00

2.1 Phones 900.00

2.2 Equipment Rental 500.00

2.3 Records Storage 2,000.00

2.4 Equipment Maintenance Agreements 1,000.00

2.5 Publications/Legal Notices 2,500.00

2.6 Janitorial Services - carpets, blinds, interior painting, etc. 1,500.00

2.7 Payroll Service 5,000.00

2.8 Supplies 2,500.00

2.9 Printing & Reproduction 250.00

2.10 Subscriptions 320.00

2.11 Computer Software & Network Maintenance 11,500.00

2.12 Postage 300.00

2.13 Telework Reimbursement 4,320.00
3 Equipment 4,800.00
5 Training and Conferences 2,000.00
6 Office Lease 28,000.00
7 Utilities 3,000.00
8 Travel - Meals & Lodging 10,000.00
9 Travel - Mileage/ Fares/ Parking 10,000.00
10 Professional & Service Organizations 4,100.00
Subtotal Items 1-10 116,740.00
11 Contingency 273,402.65
12 Salaries, Wages, & Benefits 956,245.60

12.1 Executive Director 247,676.99

12.11 Deputy Executive Director 218,538.07

12.2 Administrative Services Officer 158,324.31

12.3 Transportation Planner 152,376.25

12.4 Administrative Assistant 108,800.17

12.8 Temporary Employee 70,529.81
13 Other Services 729,358.20

13.1 Legal Counsel 15,000.00

13.2 Nevada County Auditor/Controller 30,000.00

13.3 TNT/TMA Membership 4,600.00

13.4 Fiscal Audits (WE 1.2) 60,050.00

13.6 Triennial Performance Audits (WE 1.2) 0.00

13.7 Traffic Counts (WE 2.1) 10,000.00

13.8 Transportation Engineering (WE 2.1) 40,000.00

13.11a Local Agencies (WE 2.1) 30,000.00

13.11b Local Agency LRSP (WE 2.4.1) 0.00

13.16a Rural Counties Task Force Membership (WE 2.4) 0.00

13.16b Statewide Local Streets and Roads Needs Assessment (WE 2.4) 800.00

13.17 Nevada County ERC Membership 1,000.00

13.19 Eastern Nev. Co. Transit Development Plan (WE 2.3.3) 0.00

13.62 Reenvisioning Transit in Western Nev Co.(WE 2.3.4) 170,000.00

13.21 Website Update/Maintenance 12,670.00

13.23 Regional Transportation Plan Update (WE 2.1.1) 0.00

13.30 Airport Land Use Commission Project Reviews (WE 2.4.2) 15,000.00

13.48 Human Resources Consulting (WE 1.1) 5,000.00

13.57 RCTF Rural Induced Demand Study (WE 2.4.4) 0.00

13.59 Intergovernmental Advocacy (WE 1.1) 52,000.00

13.52 Consultant Prepared ATP Applications (WE 2.4) 30,000.00

13.61 Zion St .Mobility/School Access study (WE 2.4.3) 199,998.20

8.1 & 9.1 Rural Counties Task Force Chairman Travel Mileage Meals Lodging (2.4.5) 15,000.00

13.63 Rural Counties Task Force Administrative Manual and Training (2.4.5b) 13,240.00

13.64 Calcog Academy for Regional Leadership Administration(2.4.5a ) 25,000.00 TOTAL Budget Items 1-13 2,075,746.45
Indirect Costs
Accounts 1 through 10 116,740.00
Legal 15,000.00
Nevada Co. Auditor/Controller 30,000.00
TNT/TMA 4,600.00
Nevada Co. ERC Membership 1,000.00
Website Update/Maintenance 12,670.00
Total Indirect Costs 180,010.00
Calculated Indirect Rate Indirect Cost / Salaries & Benefits 18.82% NCTC 2025/26 Overall Work Program – DRAFT March 2025 B6

Page 80 ends

Item # 5.

City of Grass Valley
City Council
Agenda Action Sheet
Title: 2025 Annual Measure E Street Rehabilitation Project – Authorization to Award Contract
CEQA: Categorically Exempt – Section 15301 “Existing Facilities” Recommendation: That Council 1) award a contract for the 2025 Annual Measure E Street Rehabilitation Project to Sierra Nevada Construction, Inc., 2) authorize the Mayor to execute the construction contract, subject to legal review and, 3) authorize the City Engineer to approve construction change orders for up to 10% of the contract amount.

Prepared by: Bjorn P. Jones, PE, City Engineer
Council Meeting Date: 4/8/2025 Date Prepared: 4/3/2025
Agenda: Consent
Background Information: The 2025 Annual Measure E Street Rehabilitation Project involves the pavement resurfacing of East Main St, Brunswick Ave, Dorsey Dr, Sutton Way, Olympic Park Circle, Old Tunnel Road and Sierra College Drive. Project work primarily includes a micro surfacing overlay, pavement markings, and striping improvements.

Bids were opened on March 27, 2025, and five bids were received. A bid summary is attached. Staff reviewed the low bid of $1,004,007.00 submitted by Sierra Nevada Construction, Inc. and determined the bid to be complete and responsive.

Staff recommends that Council authorize award and execution of a contract for the 2025 Annual Measure E Street Rehabilitation Project to Sierra Nevada Construction, Inc. in the amount of $1,004,007.00 and authorize the City Engineer to approve construction change orders for up to 10% of the contract amount.

Council Goals/Objectives: The 2025 Annual Measure E Street Rehabilitation Project executes portions of work tasks towards achieving/maintaining Strategic Plan Goal – Transportation
Fiscal Impact: The 2025 Annual Measure E Street Rehabilitation Project was budgeted at $1,000,000 in the FY 24/25 CIP Budget with Measure E funds. Additional Measure E funds are available to fund the small shortfall to the final contract amount.

Funds Available: Yes Account #: 300-406-63850
Reviewed by: City Manager

Page 81 ends

Item # 6.

H:\DESMGMNT\24-07 2025 Measure E Street Rehab\700 Construction\710 Bid Docs\Bid Summary.docx 2025 MEASURE E ANNUAL STREET REHABILITATION PROJECT
PROJECT #24-07

BID SUMMARY
Date: MARCH 27, 2025; 3:30 p.m. Engineer’s Estimate: 1,000,000.00$ BIDDER DATE/TIME REC’VD AMOUNT
Consolidated Engineering , Inc 3/27/2025
3:15 PM $1,169,999.00
Sierra Nevada Construction, Inc 3/27/2025
3:12 PM $1,004,007.00
Pavement Coatings, Co 3/27/2025
3:07 PM $1,096,539.00
VSS International, Inc 3/27/2025
3:01 PM $1,111,211.00
* Apparent Low Bidder

Page 82 ends

Item # 6.

Page 83 ends

Item # 6.

City of Grass Valley
City Council
Agenda Action Sheet
Title: Extension of an agreement between the City and Nevada County for the County to provide building inspection, plan review, and other related building services for the City.

CEQA: Not a project
Recommendation: Authorize the Mayor to sign the attached Agreement between the City of Grass Valley and Nevada County for the provision of building services, subject to legal review.

Prepared by: Jon May, Building Official
Council Meeting Date: 4/8/2025 Date Prepared: 4/3/2025
Agenda: Consent
Background Information: Since July 2014, the City has had a contract with Nevada County to provide the City’s with back up support for building plan check and inspection services. On May 29, 2019, the City signed a contract for supplemental building services with a private consulting firm while maintaining the contract with the County. Staff would like to maintain the contract with Nevada County to continue that working relationship. Attached is a one-year extension of the existing agreement with the County. The continuation of this contract will provide staff with flexibility to provide effective building services to the community.

Council Goals/Objectives: The contract will meet the City’s Strategic Plan goal of providing high performance government and quality customer service.

Fiscal Impact:Building services are paid from account 100-302. These funds are budgeted from year to year and paid through fees collected from building permits.

Funds Available: Yes Account #: 100-302
Reviewed by: City Manager
Attachments: Proposed Agreement

Page 84 ends

Item # 7.

EXTENSION OF AGREEMENT

BETWEEN THE CITY OF GRASS VALLEY AND COUNTY OF NEVADA

FOR THE PROVISION OF BUILDING SERVICES

PREAMBLE
This Agreement is made between the County of Nevada (hereinafter “COUNTY”) and the City of Grass Valley (hereinafter “CITY”), effective May 1, 2025. In consideration for this Agreement, COUNTY will provide CITY with building services and resources described herein, and CITY will pay COUNTY for said services and resources in accordance with the terms, conditions, and rates described herein.

TERMS OF AGREEMENT

1. General
COUNTY, through its Community Development Agency, will provide CITY with building department services on an “as needed” basis as described herein.

2. Period of the Agreement
This Agreement shall be effective May 1, 2025 through June 20, 2026, unless terminated earlier by either party upon thirty (30) days written notice to the other party.

If requested by CITY, COUNTY shall cooperate with CITY and contractors to ensure a smooth transition at the time of termination of this Agreement, regardless of the nature or timing of the termination. COUNTY shall cooperate with CITY to accomplish a transition of the services being terminated to CITY or to any replacement provider designated by CITY.

Such transition services shall be subject to the billing rates described in Section 5 below.

3. Services to be provided by County

3.1. COUNTY will provide a building inspector to CITY to complete building inspections on an as-needed basis. CITY must approve of assigned inspector.

3.2. COUNTY inspector services will include the following tasks as requested and as time allows:

3.2.2. Customer service requests related to existing and proposed projects.

3.2.3. Complete basic administrative tasks as associated to building inspections and project plan reviews.

3.2.4. Provide code enforcement inspections and provide appropriate code and state law references for violations pertaining to the building code.

3.3. COUNTY to provide plan review services at COUNTY offices as project submittal demands increase. The City Building Official, and County Director of Building, if needed, will review and determine which plan reviews are sent to COUNTY for review.

COUNTY plan review fees shall cover the costs of the 1st and 2nd reviews. Should additional plan reviews be needed, the COUNTY fees shall be based on the hourly billing rate per the schedule of hourly billing services shown in Section 5 of this Agreement. COUNTY to provide clear, concise, and thorough plan review comment letters from which design professionals, contractors, business owners, and

Page 85 ends

Item # 7.

Agreement for Building Services
City of Grass Valley and County of Nevada
2 homeowners can work from and understand. Should COUNTY inspector first check in at COUNTY offices prior to arrival at CITY office, inspector can deliver plan review approval and comment letters upon arrival at CITY.

3.4. COUNTY, upon receipt of a plan review at its offices, shall provide CITY with an estimated plan review turn-around schedule. COUNTY commits to completing initial plan reviews for the more common projects within two weeks, and within 4 weeks for larger and more complex projects.

3.5. COUNTY to provide Building Official services as needed.

3.6. COUNTY to provide review and approval of grading plans and associated inspections.

3.7. COUNTY to provide Certified Access Specialist (CASP) services as requested.

3.8. COUNTY will apply CITY’s code and administrative procedures for all services provided under this Agreement.

3.9. COUNTY to provide CITY with a monthly invoice that provides sufficient details for all expenditures and charges. Invoice to include reasonable documentation of expenses incurred, including but not limited to timesheets and plan review reimbursements noted in 4.4 below.

4. CITY Responsibilities

4.1. CITY to notify COUNTY 24 hours prior to building services at CITY being needed, and/or if the need is expected to be less than 2 hours. COUNTY to complete regular administrative tasks associated to inspection information processing from COUNTY offices.

4.2. City to notify County a minimum of four (4) weeks in advance when services are needed for an extended period of time to accommodate planned absences and training of CITY staff.

4.3. CITY, if need for inspection services is less than 2 hours, agrees to pay a 2-hour minimum per day for inspection services.

4.4. CITY to provide cover letter with all plan reviews conducted at COUNTY offices specifying the total plan review fee collected by CITY, and the portion to be provided to the COUNTY for its service.

4.5. CITY to pay COUNTY 65% of the plan review fee collected for plans reviewed by COUNTY offices under section 3.4 above. CITY and COUNTY will monitor this percentage and may increase the percentage up to 70%. An increase shall be based on a review that ensures both the CITY’S and COUNTY’s plan review costs are adequately recouped. COUNTY shall provide no less than sixty (60) days’ written notice of any percentage increase.

4.6. CITY will conduct all reviews and appeals of decisions and determinations made by COUNTY staff acting under section 3 above.

Page 86 ends

Item # 7.

Agreement for Building Services
City of Grass Valley and County of Nevada
3 5. Rates for Services and Support

5.1. Schedule for Hourly Billing Services:

Certified Building
Official $160.00/Hr
Certified Building
Official $160.00/Hr
Certified Building
Inspector $115.00/Hr
Certified Building
Inspector $115.00/Hr
Certified Permit
Technician $105.00/Hr
Certified Permit
Technician $105.00/Hr
Certified Plans
Examiner $155.00/Hr
Certified Plans
Examiner $155.00/Hr
Certified Access Specialist
(CASp) $155.00/Hr
Certified Access Specialist
(CASp) $155.00/Hr
Emergency Call Out (2HrMin.)
$200.00/Hr
Emergency Call Out (2HrMin.)
$200.00/Hr
Reimbursable Expenses
Time & Materials
Reimbursable Expenses
Time & Materials
Certified Building
Official $160.00/Hr
Certified Building
Official $160.00/Hr

5.2. Rate Adjustments
All rates shall be subject to annual adjustment to reflect the actual cost of providing services. Labor rates shall be based on the Countywide Cost Plan as approved by the office of the State Controller. COUNTY will provide CITY with no less than sixty (60) days written notice prior to any rate adjustments.

6. Contact Persons
For CITY OF GRASS VALLEY
Jon May, Building Official
125 East Main Street
Grass Valley, CA 95945
(530) 274-4717
For the COUNTY OF NEVADA:

George Schureck, Director of Building
950 Maidu Avenue
Nevada City, CA 95959
(530) 265-1222

7. Notices
All notices required by this Agreement shall be sent first-class mail or personally delivered to

Page 87 ends

Item # 7.

Agreement for Building Services
City of Grass Valley and County of Nevada
4 the persons and addresses set forth in above. Such addresses may be amended from time to time by the parties, which shall not be deemed or construed an amendment to this Agreement.

8. Authority
CITY and COUNTY represent that they have the authority to enter into this Agreement and perform its terms. Each party warrants that the individuals signing this Agreement have the legal authority to do so and bind each party to perform the obligations set forth herein.

9. Mutual Indemnity
The CITY shall indemnify, defend and hold harmless the COUNTY and its officers, officials, employees, agents and volunteers from any and all liabilities, claims, demands, damages, losses and expenses (including, without limitation, defense costs and attorney fees) which result from the alleged negligent acts, errors or omissions of the CITY, its employees or agents, and COUNTY employees for acts or omissions resulting from performance under Section 3 of this agreement.

COUNTY agrees to indemnify, defend and hold harmless the CITY and its officers, officials, employees, agents and volunteers from any and all liabilities, claims, demands, damages, losses and expenses (including, without limitation, defense costs and attorney fees) which result from the alleged gross negligence or willful misconduct, of its employees acting under Section 3. COUNTY additionally agrees to indemnify and defend CITY for any breach of contract or alleged negligence, error, or omission of its employees acting outside of Section

3. 10. Miscellaneous Provisions
Time is of the essence in this Agreement and all parties agree to proceed with due diligence to fulfill its terms. This Agreement shall be interpreted in accordance with the laws of the State of California, and the exclusive jurisdiction and venue over any litigation arising here from shall be the appropriate court of Nevada County, California. This Agreement contains the entire agreement between the parties with regard to all matters contained herein and supersedes all previous discussions, representations, and correspondence between the parties. If any provision of this Agreement shall be declared void, voidable, illegal or unenforceable by any court of competent jurisdiction, administrative panel or arbitration panel, such declaration or finding shall not void or cancel the other provisions of this Agreement, which shall remain binding upon the parties. No modification of this Agreement may be made except in a recorded writing signed by all parties that is approved in the manner required by California law for contracting with government agencies. This Agreement may be signed in counterparts, each of which shall constitute an original and collectively shall constitute one instrument. The parties hereto have independently reviewed this Agreement and no presumption shall arise from the fact that it was prepared by or at the request of either party. The parties shall fully cooperate with each other in performance of this Agreement, including execution of any and all reasonably required documents and take any reasonably required further acts.

11. Employee Status
Notwithstanding the parties’ mutual indemnity under section 9, the CITY and COUNTY are each responsible for all benefits, salaries, and other employer duties for their respective employees.

Page 88 ends

Item # 7.

Agreement for Building Services
City of Grass Valley and County of Nevada
5 IN WITNESS WHEREOF, the CITY OF GRASS VALLEY and COUNTY OF NEVADA have executed this agreement on the day and year set forth below.

COUNTY OF NEVADA CITY OF GRASS VALLEY
___________________________ ___________________________ Heidi Hall Hilary Hodge
Chair, Board of Supervisors Mayor
Dated: Dated:

Attest:
__________________________ __________________________
Clerk of the Board of Supervisors City Clerk
Approved as to Form:
___________________________ __________________________
County Counsel Michael Colantuono, City Attorney

Page 89 ends

Item # 7.

City of Grass Valley
City Council
Agenda Action Sheet
Title: Community Engagement Specialist Position
CEQA: Not a project.

Recommendation: That the City Council approve the creation of the Community Engagement Specialist position and authorize the promotion of an existing qualified employee to fill the position, with backfilling of any resulting vacancies.

Prepared by: Taylor Whittingslow, Deputy City Manager
Council Meeting Date: 4/8/2025 Date Prepared: 4/3/2025
Agenda: Consent
Background Information: Effective community engagement and communication are essential to maintaining transparency, fostering public trust, and ensuring citizens are well-informed about City initiatives. Currently, the City relies on an external social media contract for communication and outreach. By transitioning these responsibilities in-house, the City can enhance its engagement efforts while achieving cost savings.

The proposed Community Engagement Specialist position is designed to centralize and enhance the City’s public communication efforts, social media management, event coordination, and community outreach. This role will also oversee city branding, facilitate public safety messaging, and administer the City’s code compliance software.

The position will be classified as full-time, exempt, and will report directly to the City Manager or a designee.

The creation of this role will allow the City to:
 Improve direct engagement with residents through enhanced communication strategies.
 Increase efficiency by consolidating digital and print media efforts under a dedicated in-house specialist.
 Improve oversight and coordination of public events, decorations, and community initiatives.
 Strengthen relationships with local businesses, organizations, and stakeholders.  Enhance transparency by streamlining information dissemination and public inquiries.

The proposed salary range for the Community Engagement Specialist position will be a minimum of $36.11 per hour, a median of $45.14 per hour, and a maximum of $57.92

Page 90 ends

Item # 8.
per hour.

The establishment of the Community Engagement Specialist position aligns with the City’s commitment to effective communication, enhanced public engagement, and operational efficiency. The position will provide a cost-neutral solution that benefits the City and its residents while leveraging internal talent. The staff recommends that the City Council approve the creation of this position and authorize staff to implement the necessary hiring and transition steps.

Council Goals/Objectives: The Community Engagement Specialist Position executes portions of work tasks towards achieving/maintaining Strategic Plan – Community Leadership
Fiscal Impact: Funding for this position will be sourced from the cost savings generated by reducing external social media contracts. The allocation of salary and benefits will be distributed across the General Fund, Sewer Fund, and Water Fund to ensure that there is no net impact on the General Fund.

Funds Available: Yes
Account #: General – 100, Sewer Enterprise – 510, Water Enterprise - 500 Reviewed by: City Manager
Attachments: Community Engagement Specialist

Page 91 ends

Item # 8.
1 Community Engagement Specialist
City of Grass Valley

JOB DESCRIPTION
Department: City Administration FLSA Status: Exempt
Reports To: City Manager or Designee Unit: 1, Full-time Employee SUMMARY OF JOB PURPOSE Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect all duties performed within the job.

This position requires a combination of strategic communication skills, creative design ability, event coordination expertise, and administrative oversight. The Community Engagement Specialist serves as a liaison between the City and the community, ensuring that public information is accessible, accurate, and engaging. The role also involves working across departments to support citywide initiatives and enhance community participation in municipal programs and events.

DISTINGUISHING CHARACTERISTICS
Under the direction of the City Manager or designee, this position is responsible for managing the City's social media, website, and digital communications, coordinating public events, overseeing city décor efforts, and developing graphic design materials to support city branding and outreach.

Additionally, this role supervises the Pop-Up Events Coordinator, ensuring the successful execution of city-sponsored events and activities.

The Specialist will work closely with all city departments, including the Fire Department and Police Department, to facilitate clear communication and community outreach. This position also plays a key role in analyzing program activities, ensuring compliance with relevant laws, improving customer service with vendors, and assisting in grant applications and contract management. Furthermore, this role supports the implementation of the City Council’s vision through creative and engaging public engagement strategies.

Additionally, this position serves as the administrator for City code compliance, responsible for obtaining and managing compliance software, overseeing staff usage of the software, and ensuring proper follow-up on code enforcement matters.

This position is designated as management for Labor Relations purposes and is considered exempt under the Fair Labor Standards Act (FLSA).

SUPERVISION RECEIVED AND EXERCISED
Receives administrative direction from the City Manager or designee. Exercises direct and indirect

Page 92 ends

Item # 8.
2 Community Engagement Specialist
City of Grass Valley

JOB DESCRIPTION
supervision over departments, divisions, management, professional, technical and office support personnel.

ESSENTIAL FUNCTIONS The following duties are typical for this classification. Incumbents may not perform all of the listed duties and/or may be required to perform additional or different duties from those set forth below to address business needs and changing business practices.

1. Develop and implement communication strategies to effectively inform the public about city initiatives, programs, and services.

2. Manage and update the City’s social media platforms, website, and digital newsletters.

3. Create engaging content, including press releases, social media posts, graphics, and videos.

4. Monitor public inquiries on digital platforms and ensure timely, accurate responses.

5. Work with the Fire and Police Departments to communicate public safety messages and emergency updates.

6. Design marketing materials, infographics, event flyers, and other visual content to support city initiatives.

7. Ensure consistency in branding and messaging across all city communications.

8. Develop creative visuals for city programs, signage, and promotional materials.

9. Assist in designing presentations and reports that support the City Council’s vision and priorities.

10.Plan and coordinate city events, public meetings, and community engagement initiatives.

11.Supervise the Pop-Up Events Coordinator, providing guidance and ensuring event success.

12.Collaborate with local businesses, nonprofits, and community organizations to enhance event participation and sponsorship opportunities.

13.Attend community meetings and represent the City at public functions.

14.Oversee seasonal and event-related decorations throughout the City, ensuring aesthetic appeal and alignment with city branding.

15.Coordinate with public works and local artists for beautification projects and public art displays.

16.Analyze program activities and develop corrective actions in conjunction with City management staff to improve effectiveness and efficiency.

17.Review applications for accuracy and compliance with pertinent laws, regulations, and city policies.

18.Work directly with City vendors to manage customer issues, improve customer service, and enhance service delivery.

19.Assist with contract management, ensuring compliance with city policies and performance expectations.

20.Assist in grant application preparation and submission, supporting city funding efforts for projects and initiatives.

Page 93 ends

Item # 8.
3 Community Engagement Specialist
City of Grass Valley

JOB DESCRIPTION

21.Work directly with the Fire and Police Departments to disseminate public safety information and coordinate emergency communication efforts.

22.Partner with other city departments to promote programs, services, and initiatives.

23.Assist in developing materials and engagement strategies that reflect and support the City Council’s vision for the community.

24.Conduct community surveys and feedback initiatives to help guide decision-making and ensure alignment with resident needs.

25.Assist front counter staff with customer inquiries, transactions and general support.

26.Serve as the administrator for City code compliance software, ensuring its proper implementation and use.

27.Research, obtain, and manage code compliance software solutions.

28.Oversee staff usage of the compliance software, ensuring accurate documentation and reporting.

29.Follow up on code enforcement matters to ensure timely and effective resolution.

30.Work with relevant departments to improve efficiency and compliance processes.

KNOWLEDGE, SKILLS AND ABILITIES: The following generally describes the knowledge and ability required to enter the job and/or be learned within a short period of time in order to successfully perform the assigned duties.

Knowledge of:

1. Principles and practices of effective communication, public relations, and media engagement.

2. Social media management, website content administration, and digital marketing strategies.

3. Graphic design principles and tools such as Adobe Creative Suite and Canva.

4. Event planning, coordination, and execution.

5. Principles of branding, visual identity, and public messaging.

6. Practices of budget preparation and administration.

7. Methods used in customer service and office administration.

Ability to:

1. Independently perform a full range of varied complex, sensitive, highly responsible, and confidential office administrative, advanced clerical, and routine programmatic support functions of a general or specialized nature in support of assigned programs, division, and/or department with only occasional instruction or assistance.

2. Effectively manage multiple projects and deadlines.

3. Develop and maintain positive working relationships with community members, stakeholders, and colleagues.

4. Write and edit clear, compelling, and professional communication materials.

Page 94 ends

Item # 8.
4 Community Engagement Specialist
City of Grass Valley

JOB DESCRIPTION

5. Design engaging and visually appealing digital and print content.

6. Organize and execute community events, ensuring alignment with city goals.

7. Analyze program effectiveness and recommend improvements.

8. Adapt to changing priorities and remaining flexible in a dynamic work environment.

9. Work occasional evenings and weekends for events and public meetings.

10. Use tact, initiative, prudence, and independent judgment within general policy, procedural and legal guidelines.

11. Use computer technology and applications in the performance of daily activities.

12. Meet the physical requirements to safely and effectively perform assigned duties.

13. Organize, implement, and supervise departmental goals and City objectives.

14. Interpret and apply policies, laws, and regulations.

15. Prepare complex reports and documents.

16. Analyze problems, identify solutions, and implement recommendations.

17. Effectively negotiate solutions and contracts.

18. Plan, organize, direct, and supervise the work of staff.

19. Make presentations and represent the City in public forums.

20. Use computer programs effectively and communicate clearly.

21. Ability to step in and fulfill key responsibilities of the City’s Front Counter Staff.

Minimum Qualifications:

Any combination of training and experience that would provide the required knowledge, skills and abilities is qualifying. A typical way to obtain the required qualifications would be:

1. Bachelor's degree in Communications, Public Relations, Marketing, Graphic Design, Public Administration, or a related field (or equivalent experience).

2. Experience in social media management, public relations, event coordination, or community outreach.

3. Strong writing, editing, and verbal communication skills.

4. Proficiency in social media platforms, website content management, and graphic design tools.

5. Experience in event planning, décor coordination, and vendor management.

6. Experience in code compliance administration, including software implementation and oversight, is preferred.

7. Experience in grant application preparation and contract management is preferred.

GENERAL QUALIFICATIONS

Page 95 ends

Item # 8.
5 Community Engagement Specialist
City of Grass Valley

JOB DESCRIPTION
License Requirements
A valid California Class C driver license or higher is required at the time of appointment. Individuals who do not meet this requirement due to a disability will be reviewed on a case-by- case basis.

Physical Requirements
Incumbents appointed to this class must have the mobility to work in a standard office or field environment, use standard office equipment and attend off-site meetings; intermittently operate a motor vehicle on surface streets with occasional exposure to weather conditions, and construction and traffic hazards; mobility to traverse uneven terrain, periodically standing, stooping, bending, climbing and kneeling to perform fieldwork; intermittently sit at desk for long periods of time; lift light to moderately heavy weights; vision to read handwritten and printed materials and a computer screen; hearing and speech to communicate in person and by telephone; manual dexterity to operate small equipment, tools and standard office equipment and supplies, and to manipulate both single sheets of paper and large document holders (binders, manuals, etc.).

Working Conditions
Employees work in an office environment with moderate noise levels, controlled temperature conditions and no direct exposure to hazardous physical substances, and in the field and are occasionally exposed to loud noise levels, cold and hot temperatures, inclement weather conditions, road hazards, substantial heights, vibration, confined workspaces, chemicals, mechanical and/or electrical hazards, and hazardous physical substances and fumes. Employees may interact with upset staff and/or public and private representatives, and contractors in interpreting and enforcing departmental policies and procedures. The incumbent may be required to work evenings, weekends and holidays, and participate in after-hours on-call assignments.

GENERAL
The City reserves the right to revise or change classification duties and responsibilities as the need arises. This description does not constitute a written or implied contract of employment.

I have read and understand the contents of this job description, and I have received a copy of this job description for my records.

Print Name:

Signature: Date:

Adopted:

Revised:

Page 96 ends

Item # 8.

City of Grass Valley
City Council
Agenda Action Sheet
Title: Purchase of a Pierce Manufacturing 107’ Ascendant Aerial Ladder Truck CEQA: Not a Project
Recommendation: That 1) Council direct the Fire Chief to enter into an agreement with Pierce Manufacturing for one 107’ Ascendant Aerial Ladder Truck, subject to legal review; 2) Direct the Finance Director to make necessary budget adjustments in the 2025/2026 Fiscal Year Budget.

Prepared by: Mark Buttron- Fire Chief
Council Meeting Date: 04/08/2025 Date Prepared: 04/01/2025 Agenda: Consent
Background Information:

Grass Valley operates the only Ladder Truck in Western Nevada County servicing all fire agencies and communities with its specialized capabilities. A ladder truck differs from a fire engine most notably by the 100 ft ladder on top of the vehicle essential for accessing multi story occupancies for fire and rescue emergencies, providing elevated water streams, and providing tools and equipment for complex incidents as seen at the Everhart Fire in 2024. Ladder Trucks generally have a 20 year service history with some used in a reserve status once being removed from front line service. In 2010 the city, through a series of grants, a bequest, and impact fees, purchased a ladder truck due to the limited capability of the previous ladder truck and its excessive maintenance history. This new truck was manufactured in 2009 as a demonstration model that toured the Country prior to our purchase. The truck has serviced the City well although its operational window and maintenance issues have shown the need for increased performance now available through technology and manufacturing advancements.

In 2023 staff request approval to enter into a contract with Fire Apparatus Solutions, the KME authorized dealer for California, for one new ladder truck in the amount of $2,151,138.36. At time of request current build times for fire apparatus, including a new truck, were estimated at a minimum of 3 years for delivery. Additionally, entering into that contract saved the city a known cost increase of $106,897 on December 1st as well annual increases over the course of the agreement. The new ladder truck, assuming a 3 year build, would be delivered when the current truck is 16 years in service and 17 years on the road.

Page 97 ends

Item # 9.

The City has been presented with a unique opportunity to acquire a fire apparatus through Pierce Manufacturing’s Dealer Allocated Stock Slot (DAS) program. Since the signing of our previous contract with KME, this opportunity provides the potential to enhance operational efficiency and realize cost savings while meeting our agency's specific needs.

Key Advantages of the Pierce DAS Program:

1. Reduced Delivery Time: The proposed Pierce 107’ Ascendant Aerial Ladder Truck has an estimated build time of 11 to 13 months from the contract date, significantly shorter than the delivery timeline for the contracted KME vehicle.

2. Cost Savings: The truck is priced at $2,025,467.65, representing a savings of $125,607.71 compared to the current KME contract.

3. Enhanced Features: The DAS truck is equipped with all-wheel steering, providing superior maneuverability and agility with an improved turning radius—an invaluable feature for urban and complex emergency operations.

4. Simplified Configuration: While the DAS program provides a stock vehicle with limited customization options, staff has reviewed the specifications and confirmed that the vehicle meets the operational needs of the City.

Staff seeks approval to:
 Enter into a contract with Pierce Manufacturing for the 107’ Ascendant Aerial Ladder Truck under the DAS program.
 Collaborate with the City Attorney to seek relief from the existing KME contract prior to signing with Pierce.

This program operates on a first-come, first-served basis, and the contract must be finalized by April 30, 2025, to secure the opportunity.

We believe this acquisition will enhance the Fire Department's response capabilities while achieving fiscal efficiency. Your approval of this request is respectfully recommended.

Financial Summary:
 Pierce DAS Program Cost: $2,025,467.65
 Current KME Contract Cost: $2,151,138.36
 Savings: $125,607.71
Upon arrival of the new truck, the old truck will be sold with proceeds returned to fund balance.

Council Goals/Objectives: Exceptional Public Safety consistent with the City of Grass Valley Strategic Plan

Page 98 ends

Item # 9.

Fiscal Impact: The Ladder Truck purchase will be funded with Measure E funding which has been forecasted for expenditure / appropriation in FY 2025-26; and available fund balances expected to accrue over the next three years.

Funds Available: Yes- Future year funding Account #: 200-203-52050 Reviewed by:

Attachments: Pierce Proposal

Page 99 ends

Item # 9.

PREPARED ESPECIALLY FOR:

CITY OF GRASS VALLEY
One (1) Pierce Manufacturing, Inc.
107’ Enforcer Ascendant Quint Aerial

Page 100 ends

Item # 9.

Product Proposal
Standard Terms and Conditions (Exhibit A)
Product Specifications (Exhibit B)
Product Warranties (Exhibit C)
Dealer Supplied Products and/or Services (Exhibit D)

TABLE OF CONTENTS
1 2
3 4
5 goldenstatefire.com

Page 101 ends

Item # 9.

JROGHQVWDWHĆUHFRP
PRODUCT 1 PROPOSAL

Page 102 ends

Item # 9.

OPTION A
100% PRE-PAYMENT
This will be the price of the Product(s)
contingent upon the Customer paying the
Grand Total Purchase Price to GSFA within
thirty (30) calendar days of the Executed Date
pursuant to the Payment Terms
Please note this discount is also available contingent upon a Third Party (Leasing Company) paying 100% of the Grand Total Purchase Price on behalf of the Customer to GSFA within thirty (30) calendar days of the Executed Date pursuant to the Payment Terms

IF YOU ELECT THIS OPTION,

IT RESULTS IN A SAVINGS OF
($114,495.35) OFF

OF THE GRAND TOTAL OF OPTION B

Page 103 ends

Item # 9.
goldenstatefire.com
7400 Reese Road, Sacramento, CA 95828 | 916.330.1638
PRODUCT PROPOSAL FOR:

Grass Valley Fire Department 125 E. Main Street
Grass Valley, CA 95945
Sales Consultant
Brad Hansen
[email protected]
Mobile: (916) 869-6072
Golden State Fire Apparatus, Inc. (“GSFA”) is pleased to provide this proposal for the fire apparatus(es) and equipment identified below (the "Product”) to CITY OF GRASS VALLEY (“Customer”) for consideration. This proposal (this “Product Proposal”) includes the following exhibits attached hereto: the Standard Terms and Conditions attached as Exhibit A (the “Terms and Conditions”); the Product Specifications attached as Exhibit B (the “Specifications”); the Product Warranties attached as Exhibit C; and the Dealer Supplied Products and/or Services attached as Exhibit D (the “Dealer Supplied Products/Services List”) (all of the foregoing, collectively, the “Agreement”). Through its signature below or other Acceptance (as defined on page 2), Customer acknowledges having received and read, and agrees to be bound by, the Agreement. The Agreement shall be effective as of the latest date appearing in the signature blocks below (the “Executed Date”).

PAYMENT TERMS – Customer shall pay the total purchase price set forth directly above (the “Grand Total Purchase Price”) to GSFA within thirty (30) calendar days of the Executed Date. If payment of the Grand Total Purchase Price is late, a late fee as specified in section 6 of the Terms and Conditions may be applied, and the Prepayment Discount may be adjusted, and the Grand Total Purchase Price increased in accordance with section 2.c of the Terms and Conditions. Customer shall pay any balance due as a result of Change Orders as described in the Terms and Conditions.

MANUFACTURER – Customer acknowledges that GSFA is not an agent of the Product manufacturer identified above (“Manufacturer”) and is not capable of binding Manufacturer. Within five (5) business days of the Executed Date, GSFA shall submit an order form to the Manufacturer for the Product. GSFA’s further performance under the Agreement is contingent upon Manufacturer’s acceptance of such order form at the price and on the terms GSFA believed to be available when submitting this Product Proposal to Customer. If Manufacturer rejects such order as submitted or fails to respond to GSFA within a reasonable SUBMITTED DATE EXPIRATION DATE GSFA PROPOSAL # MANUFACTURER BID # MANUFACTURER CONSORTIUM 03/25/2025 05/23/2025 10325-25A 977 Pierce
Manufacturing,
Inc.

Sourcewell #113021-
OKC-1, ID #236,
Member #98084

ITEM PRODUCT DESCRIPTION UNIT PRICE
A One (1) Pierce Manufacturing, Inc. 107’ Enforcer Ascendant Quint Aerial 1,860,351.00 B Discount for 100% Payment at Time of Order (the “Prepayment Discount”) (108,849.00) C SUBTOTAL 1,751,502.00
D 8.875% State Sales Tax 155,445.80
E California Tire Fee 10.50
F 100% Payment & Performance Bond 4,014.00
G GRAND TOTAL PURCHASE PRICE 1,910,972.30

Page 104 ends

Item # 9.
goldenstatefire.com
7400 Reese Road, Sacramento, CA 95828 | 916.330.1638
amount of time, GSFA shall notify Customer in writing, and unless GSFA and Customer otherwise agree in writing, the Agreement shall then terminate and have no further force or effect.

PRODUCT COMPLETION – The Product shall be ready for final inspection by Customer at the manufacturing facility within approximately 11 to 13 MONTHS after the Executed Date. The foregoing estimate is provided as a good faith approximation as of the date of submission of this Product Proposal and is subject to the Terms and Conditions.

PREDELIVERY SERVICE – If applicable, after transportation from the manufacturing facility and prior to final delivery or pick up, the Product shall receive those additional Products and/or services identified on the Dealer Supplied Products/Services List. It is estimated that such a service will add approximately 0.5 to 1 MONTH(S) to the above Product completion estimate. The foregoing estimate is provided as a good faith approximation as of the date of submission of this Product Proposal and is subject to the Terms and Conditions.

PROPOSAL EXPIRATION – This Product Proposal supersedes any previous proposal(s) presented to Customer by GSFA and its employees and may be accepted by Customer on or before the Expiration Date identified above. Unless accepted by the Expiration Date, GSFA reserves the right to withdraw this Product Proposal or to alter its terms (including by providing updated Product pricing) prior to an order being accepted.

PURCHASE ORDER – Any PO shall be made out to: Golden State Fire Apparatus, Inc. – 7400 Reese Road – Sacramento, CA 95828.

ACCEPTANCE – ACCEPTANCE OF THIS PROPOSAL CREATES AN ENFORCEABLE BINDING AGREEMENT BETWEEN GSFA AND CUSTOMER. “ACCEPTANCE” MEANS THAT THE CUSTOMER DELIVERS TO GSFA: (A) A SIGNED COPY OF THIS PRODUCT PROPOSAL, OR (B) A SIGNED COPY OF A PURCHASE ORDER INCORPORATING THE AGREEMENT IN ITS ENTIRETY. ANY ADDITIONAL OR DIFFERENT TERMS, WHETHER CONTAINED IN CUSTOMER’S FORMS OR OTHERWISE PRESENTED BY CUSTOMER AT ANY TIME, ARE HEREBY REJECTED AND OF NO EFFECT UNLESS APPROVED IN WRITING SIGNED BY GSFA.

COUNTERPARTS - This Product Proposal may be executed in multiple counterparts, each of which shall be deemed an original (including copies sent to a party by electronic transmission) as against the party signing such counterpart, but which together shall constitute one and the same instrument. A signed copy of this Product Proposal delivered by facsimile, email or other means of electronic transmission will be deemed to have the same legal effect as delivery of an original signed copy of this Product Proposal.

If this Product Proposal is returned to GSFA with the signature of Customer’s authorized representative but without an attestation or co-signers signature, then absent Customer’s written notice to the contrary, GSFA shall be entitled to rely on such single signature as sufficient evidence of the signatory’s authority to execute the Agreement and bind Customer thereby.

INTENDING TO CREATE A BINDING AGREEMENT, Customer and GSFA have each caused this Product Proposal dated 03/25/2025, GSFA Proposal Number 10325-25A to be executed by their duly authorized representatives effective as of the Executed Date.

ACCEPTED AND AGREED TO BY CUSTOMER ACCEPTED AND AGREED TO BY GSFA __________________________________________________ _________________________________________________ Signature of Authorized Customer Representative Signature of Authorized GSFA Representative __________________________________________________ _________________________________________________ Print Name Print Name
__________________________________________________ _________________________________________________ Title Title
__________________________________________________ _________________________________________________ Date Date

Page 105 ends

Item # 9.

OPTION B

PAYMENT AT TIME OF DELIVERY OR PICKUP
This will be the price of the Product(s) contingent
upon the Customer paying the Grand Total
Purchase Price to GSFA at time of delivery or pickup
pursuant to the Payment Terms

Page 106 ends

Item # 9.
goldenstatefire.com
7400 Reese Road, Sacramento, CA 95828 | 916.330.1638
PRODUCT PROPOSAL FOR:

Grass Valley Fire Department
125 E. Main Street
Grass Valley, CA 95945
Sales Consultant
Brad Hansen
[email protected]
Mobile: (916) 869-6072
Golden State Fire Apparatus, Inc. (“GSFA”) is pleased to provide this proposal for the fire apparatus(es) and equipment identified below (the "Product”) to CITY OF GRASS VALLEY (“Customer”) for consideration. This proposal (this “Product Proposal”) includes the following exhibits attached hereto: the Standard Terms and Conditions attached as Exhibit A (the “Terms and Conditions”); the Product Specifications attached as Exhibit B (the “Specifications”); the Product Warranties attached as Exhibit C; and the Dealer Supplied Products and/or Services attached as Exhibit D (the “Dealer Supplied Products/Services List”) (all of the foregoing, collectively, the “Agreement”). Through its signature below or other Acceptance (as defined on page 2), Customer acknowledges having received and read, and agrees to be bound by, the Agreement. The Agreement shall be effective as of the latest date appearing in the signature blocks below (the “Executed Date”).

PAYMENT TERMS – Customer shall pay the total purchase price set forth directly above (the “Grand Total Purchase Price”) to GSFA no later than the time of GSFA’s delivery of the applicable Product to Customer’s address listed above (or Customer’s pick up of such Product at GSFA’s facilities, if approved by GSFA). GSFA shall have no obligation to deliver, or permit pick up of the Product if the Customer does not have full payment ready when the Product is complete and ready to deliver or pick up, as applicable. Customer shall pay any balance due as a result of Change Orders as described in the Terms and Conditions.

MANUFACTURER – Customer acknowledges that GSFA is not an agent of the Product manufacturer identified above (“Manufacturer”) and is not capable of binding Manufacturer. Within five (5) business days of the Executed Date, GSFA shall submit an order form to the Manufacturer for the Product. GSFA’s further performance under the Agreement is contingent upon Manufacturer’s acceptance of such order form at the price and on the terms GSFA believed to be available when submitting this Product Proposal to Customer. If Manufacturer rejects such order as submitted or fails to respond to GSFA within a reasonable amount of time, GSFA shall notify Customer in writing, and unless GSFA and Customer otherwise agree in writing, the Agreement shall then terminate and have no further force or effect.

SUBMITTED DATE EXPIRATION DATE GSFA PROPOSAL # MANUFACTURER BID # MANUFACTURER CONSORTIUM 03/25/2025 05/23/2025 10325-25B 977 Pierce
Manufacturing,
Inc.

Sourcewell #113021-
OKC-1, ID #236,
Member #98084

ITEM PRODUCT DESCRIPTION UNIT PRICE
A One (1) Pierce Manufacturing, Inc. 107’ Enforcer Ascendant Quint Aerial 1,860,351.00 B 8.875% State Sales Tax 165,106.15
C California Tire Fee 10.50
D GRAND TOTAL PURCHASE PRICE 2,025,467.65

Page 107 ends

Item # 9.
goldenstatefire.com
7400 Reese Road, Sacramento, CA 95828 | 916.330.1638
PRODUCT COMPLETION – The Product shall be ready for final inspection by Customer at the manufacturing facility within approximately 11 to 13 MONTHS after the Executed Date. The foregoing estimate is provided as a good faith approximation as of the date of submission of this Product Proposal and is subject to the Terms and Conditions.

PREDELIVERY SERVICE – If applicable, after transportation from the manufacturing facility and prior to final delivery or pick up, the Product shall receive those additional Products and/or services identified on the Dealer Supplied Products/Services List. It is estimated that such a service will add approximately 0.5 to 1 MONTH(S) to the above Product completion estimate. The foregoing estimate is provided as a good faith approximation as of the date of submission of this Product Proposal and is subject to the Terms and Conditions.

PROPOSAL EXPIRATION – This Product Proposal supersedes any previous proposal(s) presented to Customer by GSFA and its employees and may be accepted by Customer on or before the Expiration Date identified above. Unless accepted by the Expiration Date, GSFA reserves the right to withdraw this Product Proposal or to alter its terms (including by providing updated Product pricing) prior to an order being accepted.

PURCHASE ORDER – Any PO shall be made out to: Golden State Fire Apparatus, Inc. – 7400 Reese Road – Sacramento, CA 95828.

ACCEPTANCE – ACCEPTANCE OF THIS PROPOSAL CREATES AN ENFORCEABLE BINDING AGREEMENT BETWEEN GSFA AND CUSTOMER. “ACCEPTANCE” MEANS THAT THE CUSTOMER DELIVERS TO GSFA: (A) A SIGNED COPY OF THIS PRODUCT PROPOSAL, OR (B) A SIGNED COPY OF A PURCHASE ORDER INCORPORATING THE AGREEMENT IN ITS ENTIRETY. ANY ADDITIONAL OR DIFFERENT TERMS, WHETHER CONTAINED IN CUSTOMER’S FORMS OR OTHERWISE PRESENTED BY CUSTOMER AT ANY TIME, ARE HEREBY REJECTED AND OF NO EFFECT UNLESS APPROVED IN WRITING SIGNED BY GSFA.

COUNTERPARTS - This Product Proposal may be executed in multiple counterparts, each of which shall be deemed an original (including copies sent to a party by electronic transmission) as against the party signing such counterpart, but which together shall constitute one and the same instrument. A signed copy of this Product Proposal delivered by facsimile, email or other means of electronic transmission will be deemed to have the same legal effect as delivery of an original signed copy of this Product Proposal.

If this Product Proposal is returned to GSFA with the signature of Customer’s authorized representative but without an attestation or co-signers signature, then absent Customer’s written notice to the contrary, GSFA shall be entitled to rely on such single signature as sufficient evidence of the signatory’s authority to execute the Agreement and bind Customer thereby.

INTENDING TO CREATE A BINDING AGREEMENT, Customer and GSFA have each caused this Product Proposal dated 03/25/2025, GSFA Proposal Number 10325-25B to be executed by their duly authorized representatives effective as of the Executed Date.

ACCEPTED AND AGREED TO BY CUSTOMER ACCEPTED AND AGREED TO BY GSFA __________________________________________________ _________________________________________________ Signature of Authorized Customer Representative Signature of Authorized GSFA Representative __________________________________________________ _________________________________________________ Print Name Print Name
__________________________________________________ _________________________________________________ Title Title
__________________________________________________ _________________________________________________ Date Date

Page 108 ends

Item # 9.

JROGHQVWDWHĆUHFRP

STANDARD TERMS

AND CONDITIONS
Exhibit “A”
2

Page 109 ends

Item # 9.
1 STANDARD TERMS AND CONDITIONS

1. Definitions.

a. “Agreement” has the meaning given in the Product Proposal. b. “Customer” means the customer identified in the Product Proposal. c. “Dealer Preparation,” if applicable, means additional product(s) and/or services added by GSFA after Manufacturer’s completion of the Product and prior to delivery, in accordance with the Dealer Supplied Products/Services List.
d. “Dealer Supplied Products/Services List” means the Dealer Supplied Products and/or Services List attached to the Product Proposal as Exhibit D, which reflects all Dealer Preparation under the Agreement absent a valid Change Order(s).
e. “Grand Total Purchase Price” means the total purchase price for the Product identified in the Product Proposal (subject to any adjustments required or permitted by these Terms and Conditions, including by the execution of a valid Change Order(s).
f. “GSFA” means Golden State Fire Apparatus, Inc., a California corporation. g. “Manufacturer” means the person or persons, company, firm, corporation, partnership, or other organization identified in the Product Proposal as responsible for manufacturing the Product. h. “Party” or “Parties” means GSFA and/or Customer, as applicable. i. “Prepayment Discount” means a discount to the purchase price for the Product granted to Customer in connection with Customer’s advance payment of the Grand Total Purchase Price (or portion thereof, as specified in the Product Proposal).
j. “Product” means the fire apparatus(es) and any associated equipment listed in the Product Proposal and further described in the Specifications.
k. “Product Completion” means the fire apparatus(es) in the Product Proposal and further described in the Specifications being ready for final inspection by Customer at the manufacturing facility. l. “Product Proposal” means the GSFA proposal executed by Customer to which these Terms and Conditions are attached.
m. “Product Warranties” means the Manufacturer warranties for the Product attached to the Product Proposal as Exhibit C.
n. “Specifications” means the specifications for the Product attached to the Product Proposal as Exhibit B. o. “Terms and Conditions” means these Standard Terms and Conditions, which are attached to the Product Proposal as Exhibit A.

2. Purchase and Payment.
a. Purchase. Customer agrees to purchase the Product at the Grand Total Purchase Price (as such amount may be adjusted in accordance with these Terms and Conditions), pursuant to the payment terms set forth in the Product Proposal. The Grand Total Purchase Price is payable in U.S. dollars. b. Contingency Reserve Fund. The Grand Total Purchase Price may include an amount to be set aside for the purpose of funding any future costs or financial obligations incurred by Customer under the Product Proposal or any valid Change Order(s) (the “Contingency Reserve Fund”). If applicable, the amount of any required Contingency Reserve Fund will be set forth in either the Product Proposal or Exhibit D. The Contingency Reserve Fund may be withdrawn against by Customer or GSFA for the purpose of satisfying Customer’s payment obligations under the initial Product Proposal or any valid Change Order(s) (including, without limitation, a Change Order submitted by GSFA pursuant to Section 8.b). If a Contingency Reserve Fund is required under the Agreement, the amount of such fund is not intended as an estimate of the actual additional costs of contingencies, Change Orders, unforeseen items or other required work that may be incurred under the Agreement after submission of the Product Proposal to Customer, which amounts Customer acknowledges may exceed the Contingency Reserve Fund amount. The balance of any Contingency Reserve Fund will be credited against Customer’s payment obligations, or otherwise returned to

Page 110 ends

Item # 9.
2 Customer within thirty (30) calendar days of delivery of all Products under the Agreement (provided that Customer has paid all amounts owed under the Agreement as of such date). c. Prepayment Discount. If GSFA has granted Customer a Prepayment Discount, Customer must provide each associated prepayment (each, a “Prepayment”) within the time frame specified in the Product Proposal in order to receive such discount. Customer’s failure to timely make such Prepayment may result in: (i) GSFA’s termination of the Agreement; and/or (ii) Customer’s loss of the Prepayment Discount for the portion of the Grand Total Purchase Price represented by such outstanding Prepayment and the application of a late fee as set forth in Section 6, in each case in GSFA’s sole discretion.
d. State Sales Tax. Customer shall be responsible for the cost of state sales tax associated with, or attributable to, the Product. The taxes stated in the Product Proposal are subject to adjustment for the applicable state sales tax rate in effect at the time of delivery. Therefore, the sales tax set forth on the Product Proposal is only an estimate of such taxes and will be increased or decreased at the time of delivery if a change in the applicable sales tax rate has occurred, in which case Customer shall pay GSFA (or be refunded by GSFA) the difference in the applicable sales tax.

3. Product Completion Date. Within thirty (30) calendar days of the date on which the last required signatory executes the Product Proposal (such date, the “Executed Date”), GSFA shall submit to Customer a tentative Product completion date (which may differ from the Product completion estimate contained in the Product Proposal). Due to global supply chain constraints, any Product completion date contained herein, or in the Product Proposal, or otherwise provided to Customer, is a good faith estimate only as of the date provided to Customer, and merely an approximation based on current information available to GSFA and Manufacturer. Customer shall not be entitled to rely on any such estimate, and GSFA shall have no liability to Customer for a failure by GSFA or Manufacturer to meet any such estimate. All Product completion estimates are subject to modification and, if applicable, GSFA will provide updates to such estimates to Customer when available.

4. Stock / Demo Units. Notwithstanding any other provision contained in the Agreement (including Section 12 hereof concerning warranties), any Products constituting stock/demo unit(s) are sold to Customer on an as-is, first-come and first served-basis and GSFA makes no further representation or warranty to any customer with respect to such unit(s). Regardless of the terms of the Product Proposal, GSFA shall only be obligated to sell such stock/demo unit(s) to the first customer to enter into a purchase agreement with GSFA identifying such unit(s), and after the execution by GSFA of such agreement any subsequent purchase agreement (including the Agreement, as applicable) shall have no further force or effect with respect to such unit(s).

5. Multiple Unit Purchase. If the Grand Total Purchase Price includes pricing for multiple Products, the Product price stated in the Product Proposal shall only be valid if the quantity of Products being proposed are purchased at the same time, pursuant to the same Agreement. GSFA shall have no obligation to offer the same price for any Product if purchased by Customer pursuant to a later purchase agreement.

6. Late Fee; Storage Fee. A late fee equal to 0.033% of the outstanding portion of the Grand Total Purchase Price will be charged per calendar day for overdue payments beginning ten (10) calendar days after the payment is due and continuing for the first thirty (30) calendar days thereafter. After such thirty (30) calendar day period, the late fee shall increase to 0.044% per calendar day until payment of the outstanding portion of the Grand Total Purchase Price is received. If Customer is unable to satisfy the delivery requirements hereunder or is unwilling to take delivery of the Product, then GSFA shall be entitled to a storage charge running from the earlier of: (i) the date of delivery agreed to between GSFA and Customer (provided GSFA is willing and able to deliver the Product on such date), or (ii) twenty-one (21) calendar days after GSFA notifies Customer that the Product is available for delivery. The storage charge is equal to: (i) $175.00 per calendar day per apparatus stored, or (ii) the actual charges incurred by GSFA with a third party for storage of the Product, whichever is greater. Such storage charge shall continue until the actual time of delivery and Customer’s possession of the Product, and any such storage by GSFA or such third party shall be at the sole risk of Customer.

Page 111 ends

Item # 9.
3 7. Delivery; Inspection and Acceptance.
a. Delivery. Subject to Section 5 hereof, the Product is scheduled to be delivered to the location and within the time period specified in the Product Proposal. Such delivery date is an estimate, and GSFA is, notwithstanding this Section 7.a, not bound to such date unless it otherwise agrees in a separate writing to complete delivery by a date certain. For the avoidance of doubt, GSFA is not responsible for delivery delays caused by or because of actions, omissions or conduct of Customer, the Manufacturer, or their respective employees, affiliates, suppliers, contractors, and carriers. Risk of loss for the Product shall pass to Customer at the point and time of delivery (which shall include an attempted delivery by GSFA which cannot be completed due to any act of Customer). However, title to the Product shall only pass to Customer upon delivery if Customer has then fully paid GSFA all amounts due hereunder (including additional amounts due under any valid Change Order). Absent GSFA’s separate written agreement, which it may or may not provide in its sole and absolute discretion, delivery of the Product will not occur before Customer has fully paid all amounts due under the Agreement and provided proof of insurance reasonably satisfactory to GSFA. If GSFA permits Customer to take possession of the Product, Customer may not mount equipment, conduct training, or place the Product into service until all amounts due under the Agreement have been paid. If Customer has ordered multiple Products, GSFA reserves the right to deliver such Products in installments and to separately invoice Customer for such Products.
b. Inspection and Acceptance. Upon delivery, Customer shall have ten (10) calendar days within which to inspect the Product for substantial conformance to the Specifications, and in the event of substantial nonconformance to the Specifications to furnish GSFA with written notice sufficient to permit GSFA to evaluate such non-conformance (“Notice of Nonconformance to Specifications”). Contingent upon part availability and Customer’s cooperation, any Product not in substantial conformance to material Specifications shall be remedied by GSFA (by repair or replacement, at GSFA’s election) within thirty (30) calendar days from GSFA’s receipt of the Notice of Nonconformance to Specifications. In the event GSFA does not receive a Notice of Nonconformance to Specifications within ten (10) calendar days of delivery, the Product will be deemed to be in conformance with Specifications and accepted by Customer.

8. Changes to Agreement Terms.
a. Change Orders. The Customer may request that GSFA incorporate a change to the Product or the Specifications for the Product, or GSFA may submit changes to the Agreement required or permitted to be made by GSFA (pursuant to Section 8.b or otherwise) by delivering a written Change Order to the other party hereto, which shall include a description of the proposed change sufficient to permit the receiving party to evaluate such change (either, a “Change Order”). For any Change Order submitted by Customer, GSFA will provide Customer a written response (a “Response”) stating (i) whether GSFA will accommodate such Change Order (which GSFA may decide in its sole and absolute discretion); and (ii) the terms of the modification to the order, including any increase or decrease in the Grand Total Purchase Price resulting from such Change Order, a date on which any increase in the Grand Total Purchase Price must be paid, and an estimate of any effect on production scheduling or delivery resulting from such Change Order. Customer shall have seven (7) calendar days after receipt of the Response to notify GSFA as to whether Customer desires to make the changes GSFA has approved in the Response. In the event Customer countersigns GSFA’s Response, Customer shall pay the increase (or be refunded the decrease) in the Grand Total Purchase Price by the date specified in the Response. GSFA may also send Customer a Change Order to account for any changes to the Agreement required or permitted to be made by GSFA (including those changes required pursuant to Section 8.b hereof), and such Change Order shall be effective upon delivery to Customer unless Customer elects to terminate the applicable Product order under the Agreement in accordance with Section 9. b. Additional Changes.
i. Component Price Volatility; Increases Imposed by Manufacturer. GSFA shall not be responsible for (i) any unforeseen price increase or surcharge enacted by suppliers of major components of the Product (including but not limited to commercial chassis, engine, transmission, and fire pump); or (ii) price increases imposed on GSFA by Manufacturer pursuant to Manufacturer’s terms and conditions for sale of the Product (a “Manufacturer

Page 112 ends

Item # 9.
4 Price Increase”), after Customer becomes bound by the Agreement. Customer shall be responsible for all amounts arising from any price increases for major components of the Product (including all associated taxes and fees thereon) for the Product or any Manufacturer Price Increases occurring after the execution of the Agreement which increases the cost of the Product to GSFA, and such amounts will be documented on a Change Order adjusting the Grand Total Purchase Price accordingly. Customer shall pay any such price increase prior to Product delivery. A Manufacturer Price Increase may include, but shall not be limited to, an increase in Product price resulting from an increase in the Producer Price Index of Components for Manufacturing (see www.bls.gov Series ID: WPUID6112) in excess of a compounded annual growth rate of five percent (5%), as measured between the month Manufacturer accepts the applicable Product order and the month that is fourteen (14) months prior to the then-current estimated Product completion date (the foregoing, a “PPI-Based Price Increase”). If, upon Customer’s receipt of a Change Order reflecting a PPI-Based Price Increase, Customer elects to terminate the applicable Product Order in accordance with Section 8.b.iii rather than pay such increase, then in lieu of the cancellation fees described in Section 9.a hereof GSFA shall be entitled to recover and Customer shall pay GSFA’s actual non-reimbursable costs incurred in connection with the Product order through the date of Customer’s termination of such Product order. ii. New Legal Standards. In the event the Product design, materials or specifications require an alteration arising from new regulations issued by any governmental entity or trade association, including, but not limited to, the NFPA, DOT, and EPA, and such alteration increases the cost of the Product to GSFA, Customer shall be responsible for changes to the Grand Total Purchase Price arising from such alteration. GSFA shall promptly notify Customer when it becomes aware of any potential or required change in regulations occurring prior to delivery that would impact the Product purchased.
iii. Change Orders. Customer shall execute any Change Order submitted by GSFA documenting any of the changes required or permitted by Sections 8.b.i and 8.b.ii above (which shall, to the extent practicable, itemize any increases in the Grant Total Purchase Price and specify a commercially reasonable date by which Customer must pay such increase), unless Customer instead elects to terminate the applicable Product order under the Agreement within fifteen (15) calendar days of Customer’s receipt of such Change Order and in accordance with Section 9.

Absent such a termination, failure to execute a Change Order does not alter Customer’s obligations under this Section 8.b.
c. Changes in Commercial Specifications. Specifications for all components of the Product manufactured by companies other than the Manufacturer are subject to change without notice. Specifications for such components will be as available at the time of manufacture of the Product. GSFA shall not be liable for any deviations in such specifications arising from a substitution of components or changes in the design of any component by their original manufacturer.

9. Termination.
a. By Customer. Customer may terminate a Product order identified in the Product Proposal or a Change Order by providing written notice to GSFA in accordance with Section 16 hereof. If Customer elects to terminate a Product order, Customer shall pay GSFA a cancellation fee as follows: (a) after the Product order is accepted and entered by GSFA, 10% of the portion of the Grand Total Purchase Price applicable to such Product (including all associated taxes, fees and costs) (such amount, the “Product Purchase Price”); (b) after completion of the preconstruction phase of the order process, 20% of the Product Purchase Price; and (c) after the requisition of any materials or commencement of any manufacturing or assembly of the Product by either GSFA or Manufacturer but before substantial completion of such Product, 50% of the Product Purchase Price. Customer shall not be permitted to terminate a Product order after substantial completion of manufacturing and assembly of such Product (excluding any Dealer Preparation or other pre-delivery services or untypical Product customization, if applicable).

Notwithstanding the foregoing, if the applicable tier of cancellation fee is not sufficient to cover all actual costs and fees incurred by GSFA with Manufacturer in connection with Customer’s termination of the Product order (“Manufacturer Termination Fees”), then in addition to such cancellation fee Customer shall pay the balance of all Manufacturer Termination Fees. If Customer received a Prepayment Discount, such discount shall not be considered for the purpose of calculating the above cancellation fee. The tier of cancellation fee applicable to any cancellation,

Page 113 ends

Item # 9.
5 as well as the determination of whether a Product has reached substantial completion, shall be in the sole and absolute discretion of GSFA. Customer may request a fee waiver, and GSFA, in its sole discretion, may agree to waive and/or adjust such fee. GSFA will return the balance of the Grand Total Purchase Price or Product Purchase Price, as applicable, within thirty (30) calendar days of the effective date of the cancellation of the Product order or termination of the Agreement.

Customer may terminate the Agreement for an Event of Default by GSFA after providing GSFA with written notice in accordance with Section 16 (which notice shall describe with reasonably particularity the Event of Default justifying such termination) if such Event of Default remains uncured (if capable of cure) thirty (30) days following GSFA’s receipt of such notice; provided, however, that the foregoing cure period shall continue if and for so long as GSFA has commenced and is continuing to undertake commercially reasonable efforts to cure such Event of Default as promptly as reasonably practicable.
b. By GSFA. GSFA may terminate the Agreement for an Event of Default by Customer after providing Customer with written notice in accordance with Section 16 (which notice shall describe with reasonably particularity the Event of Default justifying such termination) if such Event of Default remains uncured (if capable of cure) thirty (30) days following Customer’s receipt of such notice; provided, however, that the foregoing cure period shall continue if and for so long as Customer has commenced and is continuing to undertake commercially reasonable efforts to cure such Event of Default as promptly as reasonably practicable. Notwithstanding the foregoing, GSFA may terminate the Agreement effective immediately upon written notice to Customer for Customer’s failure to pay any amount owed under the Agreement when due.

Notwithstanding any other provision of this Agreement, if Customer terminates a Product order in accordance with Section 9.a above, GSFA may elect to instead terminate the Agreement upon notice to Customer in accordance with Section 16 hereof. If GSFA terminates the Agreement in accordance with this Section 9.b, Customer shall pay the applicable tier of cancellation fee for all Products pursuant to Section 9.a above as if Customer had elected to terminate each applicable Product order.
c. Based on Discontinuation or Cancellation by Manufacturer. In the event that Manufacturer cancels a Product order (provided that such cancellation is not the result of an act by Customer in violation of the Agreement) or discontinues the manufacture of a Product prior to its completion and delivery: (i) if such Product is the only Product contemplated under the Agreement, then the Agreement shall terminate; or (ii) if additional Products are contemplated under the Agreement, then only the Product order for the applicable cancelled or discontinued Product shall be terminated. Such Agreement termination or Product termination, as applicable, shall be effective upon GSFA’s written notice to Customer of such cancellation or discontinuance in accordance with Section 16 hereof.

GSFA’s only obligation to Customer in such event shall be the return of any Prepayment paid by Customer for the cancelled or discontinued Product. For the avoidance of doubt, the cancellation fees contemplated in Section 9.a hereof shall not apply in the event of a termination pursuant to this Section 9.c.

10. Customer’s Obligations. Customer shall provide its timely and best efforts to cooperate with GSFA and Manufacturer during the Product manufacturing process. Reasonable and timely cooperation includes, without limitation, Customer’s providing timely information in response to any requests from Manufacturer or GSFA and the participation of Customer’s authorized representatives in traveling to Manufacturer’s facility for inspections and approval of the Product, including a final approval before the Product leaves Manufacturer’s facility.

11. Representations and Warranties. Customer hereby represents and warrants to GSFA as of the Executed Date that the execution of the Agreement and the purchase of the Product(s) and performance of the other obligations of Customer under the Agreement have been approved by Customer in accordance with applicable general laws and, as applicable, Customer’s charter, ordinances, purchasing policies, and other governing documents, and executed by the appropriate Customer employees, officials, and/or representatives, and funding for Customer’s performance of its obligations under the Agreement has been duly budgeted and appropriated by Customer.

Page 114 ends

Item # 9.
6 12. Standard Warranty. All applicable Manufacturer warranties are contained in the Product Warranties. Any additional warranties must be expressly approved in a writing signed by GSFA, and Customer acknowledges and agrees that Manufacturer will not be liable for any such additional warranties. a. Disclaimer. OTHER THAN AS EXPRESSLY SET FORTH IN THE AGREEMENT, GSFA, ITS AFFILIATES, AND THEIR

RESPECTIVE OFFICERS, DIRECTORS, EMPLOYEES, SHAREHOLDERS, AGENTS, OR REPRESENTATIVES, DO NOT MAKE

ANY EXPRESS OR IMPLIED WARRANTIES WITH RESPECT TO THE PRODUCT (WHETHER RELATING TO THE CONDITION

OR QUALITY OF THE PRODUCT, OR OTHERWISE) PROVIDED HEREUNDER OR OTHERWISE REGARDING THE

AGREEMENT (INCLUDING, WITHOUT LIMITATION, WITH RESPECT TO ANY APPLICABLE DEALER PREPARATION), WHETHER ORAL OR WRITTEN, EXPRESS, IMPLIED OR STATUTORY. WITHOUT LIMITING THE FOREGOING, ANY

IMPLIED WARRANTY OR CONDITION OF MERCHANTABILITY, THE IMPLIED WARRANTY AGAINST INFRINGEMENT, THE

IMPLIED WARRANTY OR CONDITION OF FITNESS FOR A PARTICULAR PURPOSE, AND ANY IMPLIED WARRANTIES ARISING FROM COURSE OF DEALING OR USAGE OF TRADE ARE EXPRESSLY EXCLUDED AND DISCLAIMED.

STATEMENTS MADE BY SALES CONSULTANTS OR IN PROMOTIONAL MATERIALS DO NOT CONSTITUTE WARRANTIES. b. Exclusions of Incidental and Consequential Damages. In no event shall GSFA be liable for consequential, incidental, or punitive damages incurred by Customer in connection with any matter arising out of or relating to the Agreement, or the breach thereof, even if GSFA has been advised of the possibility of such damages, and regardless of whether such damages arise out of breach of warranty, the Agreement, indemnity, whether resulting from nondelivery or from GSFA’s own negligence, or otherwise, except and solely to the extent such damages arise from the gross negligence or willful misconduct of GSFA.

13. Default. The occurrence of one or more of the following events (each, an “Event of Default”) shall constitute a default under the Agreement: (a) Customer’s failure to pay any amounts due or to perform any of its obligations under the Agreement; (b) GSFA’s failure to perform any of its obligations under the Agreement; (c) either Party becoming insolvent or becoming subject to bankruptcy or insolvency proceedings; (d) any representation made by either Party under the Agreement which is false in any material respect; (e) any action by Customer to dissolve, merge, consolidate or transfer a substantial portion of its property to another entity during the term of the Agreement; (f) any other material breach of the terms of the Agreement by a Party; or (g) a default or breach by Customer under any other agreement with GSFA or its affiliates.

14. Indemnification of GSFA. Customer shall indemnify, defend, and hold harmless GSFA, its agents, servants, successors and assigns from and against all losses, damages, injuries, claims, demands and expenses, including attorneys’ fees and other legal expenses, of whatever nature (“Damages”), to the extent Damages arise out of or in connection with: (i) Customer’s breach of the Agreement, or (ii) Customer’s use, storage, or operation of the Product following delivery, regardless of where, how, and by whom operated (excluding any negligent operation by GSFA).

The indemnification and assumptions of liability and obligation herein provided shall continue in full force and effect notwithstanding the termination of the Agreement, whether by expiration of time, by operation of law or otherwise.

This provision is not intended to and shall not constitute the exclusive remedy of the Parties under the Agreement; the Parties may seek indemnity from one another under other legal principles, whether based in equity or law, so long as they do not nullify or cancel the effects of this paragraph.

15. Force Majeure. GSFA shall not be responsible nor deemed to be in default of any provision of the Agreement on account of delays in performance due to causes which are beyond GSFA’s or Manufacturer’s control and which make GSFA’s performance impracticable, including but not limited to wars, insurrections, strikes or labor unrest, riots, fires, storms, floods, other acts of nature, explosions, earthquakes, accidents, any act of federal, state or local government, failure or delays in transportation, inability to obtain necessary labor, supplies or manufacturing facilities, supply chain issues, allocation regulations or orders affecting materials, equipment, facilities or completed products, failure to obtain any required license or certificates, acts of God or the public enemy or terrorism, failure of transportation, disease, pandemics or epidemics, quarantine restrictions, failure of vendors (due to causes similar to those within the scope of this clause) to perform their agreements or labor troubles causing cessation, slowdown, or interruption of work.

Page 115 ends

Item # 9.
7 16. Notice. Any notices, requests, consents, claims, demands, waivers and other communications required or permitted to be given hereunder must be given in writing at the address of each Party set forth below, or to such other address as either Party may substitute by written notice to the other in accordance with this Section 16, by one of the following methods: hand delivery; registered, express, or certified mail, return receipt requested, postage prepaid; or nationally recognized private express courier. All such communications will be deemed to have been given: (i) when delivered by hand (with written confirmation of receipt); (ii) on the third (3rd) calendar day after the date mailed, by registered, express or certified mail; or (iii) when delivered by the addressee if sent by a nationally recognized private express courier.

GSFA: CUSTOMER:

Golden State Fire Apparatus Inc. To the address listed in the Product Proposal 7400 Reese Road
Sacramento, CA 95828

17. Contradictions. In the event of a conflict between the Agreement and any Change Order, or between Change Orders, the terms of the latest executed Change Order shall control.

18. Manufacturer’s Statement of Origin. It is agreed that the manufacturer’s statement of origin (“MSO”) for the Product covered by the Agreement, if applicable, shall be retained and remain in the possession of GSFA per California Department of Vehicles (DMV) directives. Notwithstanding the foregoing, GSFA shall provide Customer with the original MSO if the Customer is self-registering, and Customer shall comply with all good-faith Process of Duty and other DMV requirements applicable to the Product and retain its own MSO.

19. Assignment. The relationship of the Parties established under the Agreement is that of independent contractors and neither Party is a partner, employee, agent, or joint venturer of or with the other. Neither Party may assign its rights and obligations under the Agreement unless it has obtained the prior written approval of the other Party.

20. Governing Law; Jurisdiction; Disputes. Without regard to any conflict of laws provisions, the Agreement is to be governed by and under the laws of the state of California. Prior to taking any legal action that may and/or can arise out of the Agreement, the Parties shall first attempt mediation with an agreed upon mediator. If the Parties cannot agree upon a mediator within thirty (30) calendar days of the submission of written notice of a dispute in accordance with Section 16 hereof, if any disputed matter remain unresolved within thirty (30) calendar days of the commencement of discussions, or if any party refuses to meet, then either party may submit any remaining disputes concerning and/or claim regarding the Agreement and/or the terms and conditions herein to the Superior Court, County of Sacramento (and the parties expressly consent to exclusive personal jurisdiction and venue before such court).

21. Entire Agreement; Amendments. The Agreement, including the Product Proposal, its exhibits, and all valid Change Orders, is the exclusive agreement between the Parties regarding the subject matter contained herein and therein. No change in, modification of, or revision of the Agreement shall be valid unless in writing and signed by duly authorized representatives of both Parties with authority to sign such amendments to the Agreement.

END OF STANDARD TERMS AND CONDITIONS

Page 116 ends

Item # 9.

JROGHQVWDWHĆUHFRP

PRODUCT

SPECIFICATIONS
Exhibit “B”
3

Page 117 ends

Item # 9.

Page 118 ends

Item # 9.

Proposal Details Report
OptionCode Type Option ProposalText
0766640 Boiler Plates, Aerial 107' ASL

Golden State Fire Apparatus Inc is pleased to submit a proposal to City of Grass Valley Fire Department for a Pierce® 107' Heavy Duty Aerial Ladder per your request for quotation. The following paragraphs will describe in detail the apparatus, construction methods, and equipment proposed. This proposal will indicate size, type, model and make of components parts and equipment, providing proof of compliance with each and every item (except where noted) in the departments advertised specifications.

PIERCE MANUFACTURING was founded in 1913. Since then, we have been building bodies with one philosophy, "BUILD THE FINEST". Our skilled craftsmen take pride in their work, which is reflected, in the final product. We have been building fire apparatus since the early "forties" giving Pierce Manufacturing over 75 years of experience in the fire apparatus market. Pierce Manufacturing has built and put into service more than 62,500 apparatus, including more than 33,900 on Pierce custom chassis designed and built specifically for fire and emergency applications. Our Appleton, Wisconsin facility has over 870,000 total square feet of floor space situated on approximately 105 acres of land. Our Bradenton, Florida facility has 300,000 square feet of floor space situated on approximately 38 acres of land.

Our beliefs in high ethical standards are carried through in all of our commitments and to everyone with whom we do business. Honesty, Integrity, Accountability and Citizenship are global tenets by which we all live and work. Consequently, we neither engage in, nor have we ever been convicted of price fixing, bid rigging, or collusion in any domestic or international fire apparatus market.

Pierce has only one brand of fire apparatus "Pierce", ensuring you are receiving top of the line product that meets your specification.

In accordance with the current edition of applicable NFPA standards, this proposal will specify whether the fire department, manufacturer, or apparatus dealership will provide required loose equipment.

Images and illustrative material in this proposal are as accurate as known at the time of publication, but are subject to change without notice. Images and illustrative material is for reference only, and may include optional equipment and accessories and may not include all standard equipment.

GENERAL DESIGN AND CONSTRUCTION
To control quality, ensure compatibility, and provide a single source for service and warranty, the custom cab, chassis, pump module and body will be entirely designed, assembled/welded and painted in Pierce owned manufacturing facilities. This includes, but not limited to the cab weldment, the pumphouse module assembly, the chassis assembly, the body and the electrical system.

QUALITY AND WORKMANSHIP
Pierce has set the pace for quality and workmanship in the fire apparatus field. Our tradition of building the highest quality units with craftsmen second to none has been the rule right from the beginning and we demonstrate that ongoing commitment by: Ensuring all steel welding follows American Welding Society D1.1-2004 recommendations for structural steel welding. All aluminum welding follows American Welding society and ANSI D1.2-2003 requirements for structural welding of aluminum. All sheet metal welding follows American welding Society B2.1-2000 requirements for structural welding of sheet metal. Our flux core arc welding uses alloy rods, type 7000 and is performed to American Welding Society standards A5.20-E70T1. Furthermore, all employees classified as welders are tested and certified to meet the American welding Society codes upon hire and every three (3) years thereafter. Pierce also employs and American Welding Society certified welding inspector in plant during working hours to monitor weld quality.

Pierce Manufacturing operates a Quality Management System under the requirements of ISO 9001. These standards sponsored by the International Organization for Standardization (ISO) specify the quality systems that are established by the manufacturer for design, manufacture, installation and service. A copy of the certificate of compliance is included with this proposal.

In addition to the Quality Management system, we also employ a Quality Achievement Supplier program to insure the vendors and suppliers that we utilize meet the high standards we demand.

That is just part of our overall "Quality at the Source" program at Pierce.

To demonstrate the quality of our products and services, a list of at least five (5) fire departments/municipalities that have purchased vehicles for a second time is provided.

DELIVERY
The apparatus will be delivered under its own power to insure proper break-in of all components while the apparatus is still under warranty. A qualified delivery representative shall deliver the apparatus and remain for a sufficient length of time to instruct personnel in proper operation, care and maintenance of the equipment delivered.

MANUAL AND SERVICE INFORMATION
At time of delivery, complete operation and maintenance manuals covering the apparatus will be provided. A permanent plate will be mounted in the driver's compartment specifying the quantity and type of fluids required including engine oil, engine coolant, transmission, pump transmission lubrication, pump primer and drive axle.

SAFETY VIDEO
At the time of delivery Pierce will also provide one (1) 39-minute, professionally produced apparatus safety video, in DVD format. A link to the video is also available on the Pierce Training website. This video will address key safety considerations for personnel to follow when they are driving, operating, and maintaining the apparatus, including the following: vehicle pre-trip inspection, chassis operation, pump operation, aerial operation, and safety during maintenance.

PERFORMANCE TESTS
A road test will be conducted with the apparatus fully loaded and a continuous run of no less than 3/25/2025
Customer: City of Grass Valley Bid Number: 977
Representative Hansen, Brad Job Number:

Requirements Manager: Organization: Golden State Fire Apparatus, Inc Description: Enforcer Ascendant 107' Ladder
Chassis: Enforcer Chassis, Aerials, Tandem Axle, Ascendant/LSL Body: Aerial, HD Ladder 107' ASL Tandem, Alum Body
Bid #: 977 1

Page 119 ends

Item # 9.
ten (10) miles. During that time the apparatus will show no loss of power nor will it overheat. The transmission drive shaft or shafts and the axles will run quietly and be free of abnormal vibration or noise. The apparatus when fully loaded will not have less than 25 percent nor more than 50 percent on the front axle, and not less than 50 percent nor more than 75 percent on the rear axle.

The apparatus will meet the current edition of applicable NFPA standards acceleration and braking requirements.

SERVICE AND WARRANTY SUPPORT
Pierce dealership support will be provided by Golden State Emergency Services Inc by operating in conjunction with a Pierce authorized service center. The service center will have factory-trained mechanics on staff versed in Pierce fire apparatus. The service facility will be located within seventy five (75) miles of the fire department.

In addition to the dealership, Pierce has service facilities located in both, Weyauwega, Wisconsin and Bradenton, Florida. Pierce also maintains a dedicated parts facility of over 100,000 square feet in Appleton, Wisconsin. The parts facility stocks in excess of $5,000,000 in parts dedicated to service and replacement parts. The parts facility employs a staff dedicated solely for the distribution and shipment of service and replacement parts.

Service parts for the apparatus being proposed can be found via Pierceparts.com which, is an interactive online tool that delivers information regarding your specific apparatus as well as the opportunity to register for training classes.

As a Pierce customer you have the ability to view the complete bill of materials for your specific apparatus, including assembly drawings, piece part drawings, and beneficial parts notations. You will also have the ability to search the complete Pierce item master through a parts search function which offers all Pierce SKU's and descriptions offered on all Pierce apparatus. Published component catalogs, which include proprietary systems along with an extensive operators manual library is available for easy reference.

Pierce Manufacturing maintains a dedicated service and warranty staff of over 35 personnel, dedicated to customer support, which also maintains a 24 hour 7 day a week toll free hot line, four (4) on staff EVTs, and offers hands-on repair and maintenance training classes multiple times a year.

LIABILITY
The successful bidder will defend any and all suits and assume all liability for the use of any patented process including any device or article forming a part of the apparatus or any appliance furnished under the contract.

INSURANCE PROVIDED BY BIDDER
Commercial General Liability Insurance
The successful bidder will, during the performance of the contract and for three (3) years following acceptance of the product, keep in force at least the following minimum limits of commercial general liability insurance:

Each Occurrence:
$1,000,000
Products/Completed Operations Aggregate:
$1,000,000
Personal and Advertising Injury:
$1,000,000
General Aggregate:
$2,000,000
Coverage will be written on a Commercial General Liability form. The policy will be written on an occurrence form and will include Contractual Liability coverage for bodily injury and property damage subject to the terms and conditions of the policy. The policy will include Owner as an additional insured when required by written contract.

Commercial Automobile Liability Insurance
The successful bidder will, during the performance of the contract, keep in force at least the following minimum limits of commercial automobile liability insurance and coverage will be written on a Commercial Automobile liability form:

Each Accident Combined Single Limit:
$1,000,000
Umbrella/Excess Liability Insurance
The successful bidder will, during the performance of the contract and for three (3) years following acceptance of the product, keep in force at least the following minimum limits of umbrella liability insurance:

Aggregate:
$3,000,000
Each Occurrence:
$3,000,000
The umbrella policy will be written on an occurrence basis and at a minimum provide excess to the bidder's General Liability and Automobile Liability policies.

The required limits can be provided by one (1) or more policies provided all other insurance requirements are met.

Coverage will be provided by a carrier(s) rated A- or better by A.M. Best.

All policies will provide a 30-day notice of cancellation to the named insured. The Certificate of Insurance will provide the following cancellation clause: Should any of the above described polices be cancelled before the expiration date thereof, notice will be delivered in accordance with the policy provisions.

Bidder agrees to furnish owner with a current Certificate of Insurance with the coverages listed above along with the bid. The certificate will show the purchaser as certificate holder.

INSURANCE PROVIDED BY MANUFACTURER
Product Liability Insurance
The manufacturer will, during the performance of the contract and for three (3) years following acceptance of the product, keep in force at least the following minimum limits of Product Liability insurance:

Each Occurrence:
$1,000,000
Products/Completed Operations Aggregate:
$1,000,000
Coverage will be written on a Commercial General Liability form. The policy will be written on an occurrence form. The manufacturer's policy will include the owner as additional insured when required by written contract between the Owner and a Pierce authorized dealer.

Bid #: 977 2

Page 120 ends

Item # 9.

Umbrella/Excess Liability Insurance
The manufacturer will, during the performance of the contract and for three (3) years following acceptance of the product, keep in force at least the following minimum limits of umbrella liability insurance:

Each Occurrence:
$25,000,000
Aggregate:
$25,000,000
The umbrella policy will be written on an occurrence basis and provide excess to the manufacturer's General Liability/Products policies.

The required limits can be provided by one (1) or more policies provided all other insurance requirements are met.

Coverage will be provided by a carrier(s) rated A- or better by A.M. Best.

All policies will provide a 30-day notice of cancellation to the named insured. The Certificate of Insurance will provide the following cancellation clause: Should any of the above described polices be cancelled before the expiration date thereof, notice will be delivered in accordance with the policy provisions.

Manufacturer agrees to furnish owner with a current Certificate of Insurance with the coverages listed above along with the bid. The certificate will show the purchaser as the certificate holder. 0018180 Single Source Compliance, Aerials

SINGLE SOURCE MANUFACTURER
Pierce Manufacturing, Inc. provides an integrated approach to the design and manufacture of our products that delivers superior apparatus and a dedicated support team. From our facilities, the chassis, cab weldment, cab, pump house (including the sheet metal enclosure, valve controls, piping and operators panel) body and aerial device will be entirely designed, tested, and hand assembled to the customer's exact specifications. The electrical system either hardwired or multiplexed, will be both designed and integrated by Pierce Manufacturing. The warranties relative to these major components (excluding component warranties such as engine, transmission, axles, pump, etc.) will be provided by Pierce as a single source manufacturer.

Pierce's single source solution adds value by providing a fully engineered product that offers durability, reliability, maintainability, performance, and a high level of quality. 0584456 Manufacture Location, Appleton,
Wisconsin
Your apparatus will be manufactured in Appleton, Wisconsin. 0584452 RFP Location: Appleton, Wisconsin

0588609 Vehicle Destination, US
0829495 SP DAS Truck DEALER ALLOCATED STOCK
This build started with DAS template 107' T3
0816491 Comply NFPA 1900 Changes
Effective Jan 1, 2024, With
Exceptions
NFPA 2024 STANDARDS
This unit will comply with the NFPA standards effective January 1, 2024, except for fire department directed exceptions. These exceptions will be set forth in the Statement of Exceptions.

Certification of slip resistance of all stepping, standing and walking surfaces will be supplied with delivery of the apparatus.

All horizontal surfaces designated as a standing or walking surface that are greater than 48.00" above the ground must be defined by a 1.00" wide line along its outside perimeter. Perimeter markings and designated access paths to destination points will be identified on the customer approval print and are shown as approximate. Actual location(s) will be determined based on materials used and actual conditions at final build. Access paths may pass through hose storage areas and opening or removal of covers or restraints may be required. Access paths may require the operation of devices and equipment such as the aerial device or ladder rack.

A plate that is highly visible to the driver while seated will be provided. This plate will show the overall height, length, and gross vehicle weight rating.

The manufacturer will have programs in place for training, proficiency testing and performance for any staff involved with certifications.

An official of the company will designate, in writing, who is qualified to witness and certify test results.
0533351 Quint Fire Apparatus

0588612 Vehicle Certification, Aerial w/Pump

Bid #: 977 3

Page 121 ends

Item # 9.
0681278 Agency, Apparatus Certification,
Aerial w/Pump, U.L.

NFPA COMPLIANCY
Apparatus proposed by the bidder will meet the applicable requirements of the National Fire Protection Association (NFPA) as stated in current edition at time of contract execution. Fire department's specifications that differ from NFPA specifications will be indicated in the proposal as "non-NFPA".

INSPECTION CERTIFICATE
A third party inspection certificate for the aerial device will be furnished upon delivery of the aerial device. The certificate will be Underwriters Laboratories Inc. Type 1 and will indicate that the aerial device has been inspected on the production line and after final assembly.

Visual structural inspections will be performed on all welds on both aluminum and steel ladders.

On critical weld areas, or on any suspected defective area, the following tests will be conducted:

Magnetic particle inspection will be conducted on steel aerials to assure the integrity of the weldments and to detect any flaws or weaknesses. Magnets will be placed on each side of the weld while iron powder is placed on the weld itself. The powder will detect any crack that may exist. This test will conform to ASTM E709 and be performed prior to assembly of the aerial device.

A liquid penetrant test will be conducted on aluminum aerials to assure the integrity of the weldments and to detect any flaws or weaknesses. This test will conform to ASTM E165 and be performed prior to assembly of the aerial device.

Ultrasonic inspection will be conducted on all aerials to detect any flaws in pins, bolts and other critical mounting components.

In addition to the tests above, functional tests, load tests, and stability tests will be performed on all aerials. These tests will determine any unusual deflection, noise, vibration, or instability characteristics of the unit.

PUMP TEST
The pump will be tested, approved and certified by Underwriter's Laboratory at the manufacturer's expense. The test results and the pump manufacturer's certification of hydrostatic test; the engine manufacturer's certified brake horsepower curve; and the manufacturer's record of pump construction details will be forwarded to the Fire Department.

GENERATOR TEST
If the unit has a generator, the generator will be tested, approved, and certified by Underwriters Laboratories at the manufacturer's expense. The test results will be provided to the Fire Department at the time of delivery.

BREATHING AIR TEST
If the unit has breathing air, Pierce Manufacturing will draw an air sample from the air system and certify that the air quality meets the requirements of NFPA 1989, Standard on Breathing Air Quality for Fire and Emergency Services Respiratory Protection. 0816495 Certification, Vehicle Inspection
Program, NFPA 1900

VEHICLE INSPECTION PROGRAM CERTIFICATION
To assure the vehicle is built to current NFPA 1900 standards, the apparatus, in its entirety, will be third-party, independent, audit-certified through Underwriters Laboratory (UL) that it is built and complies to all applicable standards in the current edition. The certification includes: all design, production, operational, and performance testing of not only the apparatus, but those components that are installed on the apparatus.

A placard will be affixed in the driver's side area stating the third party agency, the date, the standard and the certificate number of the whole vehicle audit. 0537375 Unit of Measure, US Gallons

0030006 Bid Bond Not Requested

BID BOND NOT REQUESTED
A bid bond will not be included. If requested, the following will apply:

All bidders will provide a bid bond as security for the bid in the form of a 5 percent bid bond to accompany their bid. This bid bond will be issued by a Surety Company who is listed on the U.S.

Treasury Departments list of acceptable sureties as published in Department Circular 570. The bid bond will be issued by an authorized representative of the Surety Company and will be accompanied by a certified power of attorney dated on or before the date of bid. The bid bond will include language, which assures that the bidder/principal will give a bond or bonds as may be specified in the bidding or contract documents, with good and sufficient surety for the faithful performance of the contract, including the Basic One (1) Year Limited Warranty, and for the prompt payment of labor and material furnished in the prosecution of the contract.

Notwithstanding any document or assertion to the contrary, any surety bond related to the sale of a vehicle will apply only to the Basic One (1) Year Limited Warranty for such vehicle. Any surety bond related to the sale of a vehicle will not apply to any other warranties that are included within this bid (OEM or otherwise) or to the warranties (if any) of any third party of any part, component, attachment or accessory that is incorporated into or attached to the vehicle. In the event of any contradiction or inconsistency between this provision and any other document or assertion, this provision will prevail.

Bid #: 977 4

Page 122 ends

Item # 9.
0816571 Performance Bond, 100% with 25%
Warranty Bond, 1 Yr, and Payment
Bond, PPI Terms
PERFORMANCE BOND, 1 YEAR
The successful bidder will furnish a Performance and Payment bond (Bond) equal to 100 percent of the total contract amount within 30 days of the notice of award. Such Bond will be in a form acceptable to the Owner and issued by a surety company included within the Department of Treasury's Listing of Approved Sureties (Department Circular 570) with a minimum A.M. Best Financial Strength Rating of A and Size Category of XV. In the event of a bond issued by a surety of a lesser Size Category, a minimum Financial Strength rating of A+ is required.

Bidder and Bidder's surety agree that the Bond issued hereunder, whether expressly stated or not, also includes the surety's guarantee of the vehicle manufacturer's Basic One (1) Year Limited Warranty period included within this proposal. Owner agrees that the penal amount of this bond will be simultaneously amended to 25 percent of the total contract amount upon satisfactory acceptance and delivery of the vehicle(s) included herein. Notwithstanding anything contained within this contract to the contrary, the surety's liability for any warranties of any type will not exceed one (1) year from the date of such satisfactory acceptance and delivery, or the actual Basic One (1) Year Limited Warranty period, whichever is shorter.

Due to global supply chain constraints, any delivery date contained herein is a good faith estimate as of the date of this order/contract, and merely an approximation based on current information. Delivery updates will be made available, and a final firm delivery date will be provided as soon as possible.

If the Producer Price Index of Components for Manufacturing [www.bls.gov Series ID:

WPUID6112] ("PPI") has increased at a compounded annual growth rate of 5.0% or more between the month Pierce accepts the order ("Order Month") and a month 14 months prior to the then predicted Ready For Pickup date ("Evaluation Month"), then pricing may be updated in an amount equal to the increase in PPI over 5.0% for each year or fractional year between the Order Month and the Evaluation Month.

The seller will document any such updated price for the customer's approval before proceeding and provide an option to cancel the order.
0000007 Approval Drawing APPROVAL DRAWING
A drawing of the proposed apparatus will be prepared and provided to the purchaser for approval before construction begins. The Pierce sales representative will also be provided with a copy of the same drawing. The finalized and approved drawing will become part of the contract documents. This drawing will indicate the chassis make and model, location of the lights, siren, horns, compartments, major components, etc.

A "revised" approval drawing of the apparatus will be prepared and submitted by Pierce to the purchaser showing any changes made to the approval drawing. 0002928 Electrical Diagrams ELECTRICAL WIRING DIAGRAMS
Two (2) electrical wiring diagrams, prepared for the model of chassis and body, will be provided. 0786875 Enforcer Chassis, Aerials, Tandem
Axle, Ascendant/LSL

ENFORCER CHASSIS
The Pierce Enforcer™ is the custom chassis developed exclusively for the fire service. Chassis provided will be a new, tilt-type custom fire apparatus. The chassis will be manufactured in the apparatus body builder's facility eliminating any split responsibility. The chassis will be designed and manufactured for heavy-duty service, with adequate strength, capacity for the intended load to be sustained, and the type of service required. The chassis will be the manufacturer's first line tilt cab.
0000110 Wheelbase WHEELBASE
The wheelbase of the vehicle will be 249.00.
0000070 GVW Rating GVW RATING
The gross vehicle weight rating will be 66,800.
0729280 Frame Rails, 13.38 x 3.50 x .375,
Enforcer
FRAME
The chassis frame will be built with two (2) steel channels bolted to five (5) cross members or more, depending on other options of the apparatus. The side rails will have a 13.38" tall web over the front and mid sections of the chassis, with a continuous smooth taper to 10.75" over the rear axle. Each rail will have a section modulus of 25.992 cubic inches and a resisting bending moment (rbm) of 3,119,040 in-lb over the critical regions of the frame assembly, with a section modulus of 18.96 cubic inches with an rbm of 2,275,200 in-lb over the rear axle. The frame rails will be constructed of 120,000 psi yield strength heat-treated 0.38" thick steel with 3.50" wide flanges.
0889469 Frame Liner, "C/Inv L" 12.50" x 3.00"
x .25", AXT/Vel/Imp/Enf, 56" QVal

FRAME REINFORCEMENT
In addition, a mainframe internal liner will be provided. The liner will be an internal "C" design that steps to an internal "L" design over the rear axle. It will be heat-treated steel measuring 12.50" x

3.00" x 0.25" through the front portion of the liner, stepping to 9.38" x 3.00" x 0.25" through the rear portion of the liner. Each liner will have a section modulus of 13.58 cubic inches, yield strength of 110,000 psi, and rbm of 1,494,042 in-lb. Total rbm at wheelbase center will be 4,391,869 in-lb.

The frame liner will be mounted inside of the chassis frame rail and extend the full length of the frame.

Bid #: 977 5

Page 123 ends

Item # 9.
0629940 Axle, Front, Oshkosh TAK-4, Non
Drive, 22,800 lb, Enforcer

FRONT NON DRIVE AXLE
The Oshkosh TAK-4® front axle will be of the independent suspension design with a ground rating of 22,800 lb.

Upper and lower control arms will be used on each side of the axle. Upper control arm castings will be made of 100,000-psi yield strength 8630 steel and the lower control arm casting will be made of 55,000-psi yield ductile iron.

The center cross members and side plates will be constructed out of 80,000-psi yield strength steel.

Each control arm will be mounted to the center section using elastomer bushings. These rubber bushings will rotate on low friction plain bearings and be lubricated for life. Each bushing will also have a flange end to absorb longitudinal impact loads, reducing noise and vibrations.

There will be nine (9) grease fittings supplied, one (1) on each control arm pivot and one (1) on the steering gear extension.

The upper control arm will be shorter than the lower arm so that wheel end geometry provides positive camber when deflected below rated load and negative camber above rated load.

Camber at load will be zero degrees for optimum tire life.

The ball joint bearing will be of low friction design and be maintenance free.

Toe links that are adjustable for alignment of the wheel to the center of the chassis will be provided.

The wheel ends will have little to no bump steer when the chassis encounters a hole or obstacle.

The steering linkage will provide proper steering angles for the inside and outside wheel, based on the vehicle wheelbase.

The axle will have a turning angle of up to 45 degrees. 0010427 Suspension, Front TAK-4, 22,800 lb,
Qtm/AXT/Imp/Vel/Enf/SFR

FRONT SUSPENSION
Front Oshkosh TAK-4™ independent suspension will be provided with a minimum ground rating of 22,800 lb.

The independent suspension system will be designed to provide maximum ride comfort. The design will allow the vehicle to travel at highway speeds over improved road surfaces and at moderate speeds over rough terrain with minimal transfer of road shock and vibration to the vehicle's crew compartment.

Each wheel will have torsion bar type spring. In addition, each front wheel end will also have energy absorbing jounce bumpers to prevent bottoming of the suspension.

The suspension design will be such that there is at least 10.00" of total wheel travel and a minimum of 3.75" before suspension bottoms.

The torsion bar anchor lock system allows for simple lean adjustments, without the use of shims.

One can adjust for a lean within 15 minutes per side. Anchor adjustment design is such that it allows for ride height adjustment on each side.

The independent suspension was put through a durability test that simulated 140,000 miles of inner city driving.
0087572 Shock Absorbers, KONI, TAK-4,
Qtm/AXT/Imp/Vel/DCF/Enf

FRONT SHOCK ABSORBERS
KONI heavy-duty telescoping shock absorbers will be provided on the front suspension. 0000322 Oil Seals, Front Axle FRONT OIL SEALS
Oil seals with viewing window will be provided on the front axle. 0899438 Tires, Front, Goodyear, Armor MAX
MSA, 425/65R22.50, 20 ply

FRONT TIRES
Front tires will be Goodyear 425/65R22.50 radials, 20 ply Armor Max MSA, rated for 22,800 lb maximum axle load and 68 mph maximum speed.
0752585 Wheels, Front, Alcoa, 22.50" x

12.25", Aluminum, Dura-Black, Hub
Pilot
The tires will be mounted on Alcoa© 22.50" x 12.25" Dura-Black® aluminum disc type wheels with a ten (10) stud, 11.25" bolt circle.
0785450 Axle, Rear, Oshkosh TAK-4 T3,
44,000 lb, Rear Steer, 2 Axle,
Enforcer

REAR AXLE
The rear axle will be a tandem axle assembly, of the Oshkosh TAK-4® T3, Tight Turning Technology, independent suspension design, with the ability to support a mechanical rear axle steering system. Tandem rear axles will have a ground rating of 44,000 lb.

The rear axles will be designed for specific use of the independent suspension.

The rear independent suspension driving axles will be equipped with a carrier reduction of 1.69 to

1.00 with a planetary wheel end reduction of 3.55 to 1.00. Driving torque will be transmitted from the center differential to the planetary wheel drive by means of a half shaft.

Oil fills and level checks will be required at the center differential and the planet wheel end locations.

An inter-axle differential, which divides torque evenly between axles, will be provided with an indicator light mounted on the cab instrument panel.

REAR AXLE STEERING
The tandem rear axle assembly will include a mechanical rear steering system. The mechanical rear steering system will be applied to both rear axles.

The steering geometry will be designed to minimize tire scrub of the rear tandem axle tires while reducing the overall turning diameter of the apparatus.

The mechanical rear steering system will not use electronic controls and will not have a means to be disengaged. Coordinated steering is the only steering mode supported by the mechanical steering system.

Rear steering system is actuated by a mechanical means of connecting the front master/slave steering gear system to a rear axle master/slave steering gear system.

Bid #: 977 6

Page 124 ends

Item # 9.
0544244 Top Speed of Vehicle, 60 MPH/96
KPH

TOP SPEED OF VEHICLE
A rear axle ratio will be furnished to allow the vehicle to reach a top speed of 60 mph/96KPH. 0639379 Suspen, Rear, Oshkosh TAK-4,
Independent, 44,000 lb

REAR SUSPENSION
The rear suspension will be an Oshkosh TAK-4® independent type with a minimum ground rating of 44,000 lbs.

The independent suspension will be configured with upper and lower control arms with a spring seat for a coil spring mounted to the lower control arm. The spring tower will be integrated into the suspension frame mount. Each control arm has elastomeric bushings at the inner pivot locations with a ball joint bearing at the outer pivot location. All suspension pivot joints will be of a maintenance free design.

The rear independent suspension will be provided with steering toe links providing tow adjustments and maintaining wheel control throughout the range of wheel travel.

The independent suspension will be designed to provide maximum ride quality when traveling at highway speeds over improved roads or a moderate speeds over secondary road surfaces with minimal transfer of shock and vibration to the apparatus.

Each independent suspension will utilize a coil type of spring. The design will allow for removal of the spring without the use of any spring compression.

The rear suspension will provide a minimum wheel travel of 10.00", 6.00" jounce and 4.00" of rebound.
0000485 Oil Seals, Rear Axle

REAR OIL SEALS
Oil seals will be provided on the rear axle(s).
0802654 Tires, Rear, Goodyear, Armor Max
MSA, 445/65R22.5, 20 ply,
(AWS/IRS), Tandem

REAR TIRES
Rear tires will be four (4) Goodyear radials 445/65R22.50, 20 ply all-position Armor Max MSA tread, rated for 49,200 lb maximum axle load and 68 mph maximum speed. 0826900 Wheels, Rear, 22.50" x 13.00", Steel,
Hub Pilot, Tandem, AWS/IRS
The tires will be mounted on 22.50" x 13.00" steel disc type wheels with a ten (10) stud,11.25" bolt circle.
0568081 Tire Balancing, Counteract Beads

TIRE BALANCE
All tires will be balanced with Counteract balancing beads. The beads will be inserted into the tire and eliminate the need for wheel weights.
0620569 Tire Pressure Monitoring,
RealWheels, AirSecure, Valve Cap,
Tandem Axle

TIRE PRESSURE MANAGEMENT
There will be a RealWheels LED AirSecure™ tire alert pressure management system provided, that will monitor each tire's pressure. A sensor will be provided on the valve stem of each tire for a total of 10 tires.

The sensor will calibrate to the tire pressure when installed on the valve stem for pressures between 10 and 200 psi. The sensor will activate an integral battery operated LED when the pressure of that tire drops 5 to 8 psi.

Removing the cap from the sensor will indicate the functionality of the sensor and battery. If the sensor and battery are in working condition, the LED will immediately start to flash. 0801932 Lug Nut, Covers, Stainless Steel

LUG NUT COVERS
Stainless steel lug nut covers will be installed on all lug nuts. 0003245 Axle Hub Covers w/center hole, S/S,
Front Axle

FRONT HUB COVERS
Stainless steel hub covers will be provided on the front axle. An oil level viewing window will be provided.
0002045 Mud Flap, Front and Rear, Pierce
Logo

MUD FLAPS
Mud flaps with a Pierce logo will be installed behind the front and rear wheels. 0601010 Chocks, Wheel, SAC-44-E, Folding,
Aerials

WHEEL CHOCKS
There will be one (1) pair of folding Ziamatic, Model SAC-44-E, aluminum alloy, Quick-Choc wheel blocks, with easy-grip handle provided.
0601009 Mounting Brackets, Chocks, SAC-44-
E, Folding, Horizontal, Aerials
Wheel Chock Brackets
There will be one (1) pair of Zico, Model SQCH-44-H, horizontal mounting wheel chock brackets provided for the Ziamatic, Model SAC-44-E, folding wheel chocks. The brackets will be made of aluminum and consist of a quick release spring loaded rod to hold the wheel chocks in place. The brackets will be mounted forward of the left side rear tire.

Bid #: 977 7

Page 125 ends
← All documents from this meeting