Cities Index.
Agenda

Hemet City Council
January 25, 2022

Document
Agenda
Meeting
January 25, 2022
Body
Hemet City Council
Pages
2,163
Original file
638.4 MB
Text extracted from the city's file for reading and search. Open the original on hemetca.civicweb.net. That file is the official record.

15.B

Page 883 of 2163 ends

1 Table of Contents
About the Author............................................................................................................ii Introduction....................................................................................................................2 Establishing a Quorum...................................................................................................2 The Role of the Chair......................................................................................................2 The Basic Format for an Agenda Item Discussion........................................................2 Motions in General.........................................................................................................3 The Three Basic Motions................................................................................................3 Multiple Motions Before the Body.................................................................................4 To Debate or Not to Debate............................................................................................4 Majority and Super-Majority Votes ...............................................................................5 Counting Votes................................................................................................................5 The Motion to Reconsider..............................................................................................6 Courtesy and Decorum ..................................................................................................7 Special Notes About Public Input..................................................................................7

Page 86 of 93 ends

15.B

Page 884 of 2163 ends

2 Establishing a Quorum
The starting point for a meeting is the establishment of a quorum.

A quorum is defined as the minimum number of members of the body who must be present at a meeting for business to be legally transacted. The default rule is that a quorum is one more than half the body. For example, in a five-member body a quorum is three.

When the body has three members present, it can legally transact business. If the body has less than a quorum of members present, it cannot legally transact business. And even if the body has a quorum to begin the meeting, the body can lose the quorum during the meeting when a member departs (or even when a member leaves the dais). When that occurs the body loses its ability to transact business until and unless a quorum is reestablished.

The default rule, identified above, however, gives way to a specific rule of the body that establishes a quorum. For example, the rules of a particular five-member body may indicate that a quorum is four members for that particular body. The body must follow the rules it has established for its quorum. In the absence of such a specific rule, the quorum is one more than half the members of the body.

The Role of the Chair
While all members of the body should know and understand the rules of parliamentary procedure, it is the chair of the body who is charged with applying the rules of conduct of the meeting. The chair should be well versed in those rules. For all intents and purposes, the chair makes the final ruling on the rules every time the chair states an action. In fact, all decisions by the chair are final unless overruled by the body itself.

Since the chair runs the conduct of the meeting, it is usual courtesy for the chair to play a less active role in the debate and discussion than other members of the body. This does not mean that the chair should not participate in the debate or discussion. To the contrary, as a member of the body, the chair has the full right to participate in the debate, discussion and decision-making of the body. What the chair should do, however, is strive to be the last to speak at the discussion and debate stage. The chair should not make or second a motion unless the chair is convinced that no other member of the body will do so at that point in time.

The Basic Format for an Agenda Item Discussion
Formal meetings normally have a written, often published agenda.

Informal meetings may have only an oral or understood agenda. In either case, the meeting is governed by the agenda and the agenda constitutes the body’s agreed-upon roadmap for the meeting. Each agenda item can be handled by the chair in the following basic format:

Introduction
The rules of procedure at meetings should be simple enough for most people to understand. Unfortunately, that has not always been the case. Virtually all clubs, associations, boards, councils and bodies follow a set of rules — Robert’s Rules of Order — which are embodied in a small, but complex, book. Virtually no one I know has actually read this book cover to cover. Worse yet, the book was written for another time and for another purpose. If one is chairing or running a parliament, then Robert’s Rules of Order is a dandy and quite useful handbook for procedure in that complex setting. On the other hand, if one is running a meeting of say, a five-member body with a few members of the public in attendance, a simplified version of the rules of parliamentary procedure is in order.

Hence, the birth of Rosenberg’s Rules of Order.

What follows is my version of the rules of parliamentary procedure, based on my decades of experience chairing meetings in state and local government. These rules have been simplified for the smaller bodies we chair or in which we participate, slimmed down for the 21st Century, yet retaining the basic tenets of order to which we have grown accustomed. Interestingly enough, Rosenberg’s Rules has found a welcoming audience. Hundreds of cities, counties, special districts, committees, boards, commissions, neighborhood associations and private corporations and companies have adopted Rosenberg’s Rules in lieu of Robert’s Rules because they have found them practical, logical, simple, easy to learn and user friendly.

This treatise on modern parliamentary procedure is built on a foundation supported by the following four pillars:

1. Rules should establish order. The first purpose of rules of parliamentary procedure is to establish a framework for the orderly conduct of meetings.

2. Rules should be clear. Simple rules lead to wider understanding and participation. Complex rules create two classes: those who understand and participate; and those who do not fully understand and do not fully participate.

3. Rules should be user friendly. That is, the rules must be simple enough that the public is invited into the body and feels that it has participated in the process.

4. Rules should enforce the will of the majority while protecting the rights of the minority. The ultimate purpose of rules of procedure is to encourage discussion and to facilitate decision making by the body. In a democracy, majority rules. The rules must enable the majority to express itself and fashion a result, while permitting the minority to also express itself, but not dominate, while fully participating in the process.

Page 87 of 93 ends

15.B

Page 885 of 2163 ends

3 Ninth, the chair takes a vote. Simply asking for the “ayes” and then asking for the “nays” normally does this. If members of the body do not vote, then they “abstain.” Unless the rules of the body provide otherwise (or unless a super majority is required as delineated later in these rules), then a simple majority (as defined in law or the rules of the body as delineated later in these rules) determines whether the motion passes or is defeated.

Tenth, the chair should announce the result of the vote and what action (if any) the body has taken. In announcing the result, the chair should indicate the names of the members of the body, if any, who voted in the minority on the motion. This announcement might take the following form: “The motion passes by a vote of 3-2, with Smith and Jones dissenting. We have passed the motion requiring a 10-day notice for all future meetings of this body.”
Motions in General
Motions are the vehicles for decision making by a body. It is usually best to have a motion before the body prior to commencing discussion of an agenda item. This helps the body focus.

Motions are made in a simple two-step process. First, the chair should recognize the member of the body. Second, the member of the body makes a motion by preceding the member’s desired approach with the words “I move … ”
A typical motion might be: “I move that we give a 10-day notice in the future for all our meetings.”
The chair usually initiates the motion in one of three ways:

1. Inviting the members of the body to make a motion, for example, “A motion at this time would be in order.”

2. Suggesting a motion to the members of the body, “A motion would be in order that we give a 10-day notice in the future for all our meetings.”

3. Making the motion. As noted, the chair has every right as a member of the body to make a motion, but should normally do so only if the chair wishes to make a motion on an item but is convinced that no other member of the body is willing to step forward to do so at a particular time.

The Three Basic Motions
There are three motions that are the most common and recur often at meetings:

The basic motion. The basic motion is the one that puts forward a decision for the body’s consideration. A basic motion might be: “I move that we create a five-member committee to plan and put on our annual fundraiser.”
First, the chair should clearly announce the agenda item number and should clearly state what the agenda item subject is. The chair should then announce the format (which follows) that will be followed in considering the agenda item.

Second, following that agenda format, the chair should invite the appropriate person or persons to report on the item, including any recommendation that they might have. The appropriate person or persons may be the chair, a member of the body, a staff person, or a committee chair charged with providing input on the agenda item.

Third, the chair should ask members of the body if they have any technical questions of clarification. At this point, members of the body may ask clarifying questions to the person or persons who reported on the item, and that person or persons should be given time to respond.

Fourth, the chair should invite public comments, or if appropriate at a formal meeting, should open the public meeting for public input.

If numerous members of the public indicate a desire to speak to the subject, the chair may limit the time of public speakers. At the conclusion of the public comments, the chair should announce that public input has concluded (or the public hearing, as the case may be, is closed).

Fifth, the chair should invite a motion. The chair should announce the name of the member of the body who makes the motion.

Sixth, the chair should determine if any member of the body wishes to second the motion. The chair should announce the name of the member of the body who seconds the motion. It is normally good practice for a motion to require a second before proceeding to ensure that it is not just one member of the body who is interested in a particular approach. However, a second is not an absolute requirement, and the chair can proceed with consideration and vote on a motion even when there is no second. This is a matter left to the discretion of the chair.

Seventh, if the motion is made and seconded, the chair should make sure everyone understands the motion.

This is done in one of three ways:

1. The chair can ask the maker of the motion to repeat it;

2. The chair can repeat the motion; or

3. The chair can ask the secretary or the clerk of the body to repeat the motion.

Eighth, the chair should now invite discussion of the motion by the body. If there is no desired discussion, or after the discussion has ended, the chair should announce that the body will vote on the motion. If there has been no discussion or very brief discussion, then the vote on the motion should proceed immediately and there is no need to repeat the motion. If there has been substantial discussion, then it is normally best to make sure everyone understands the motion by repeating it.

Page 88 of 93 ends

15.B

Page 886 of 2163 ends

4 First, the chair would deal with the third (the last) motion on the floor, the substitute motion. After discussion and debate, a vote would be taken first on the third motion. If the substitute motion passed, it would be a substitute for the basic motion and would eliminate it. The first motion would be moot, as would the second motion (which sought to amend the first motion), and the action on the agenda item would be completed on the passage by the body of the third motion (the substitute motion). No vote would be taken on the first or second motions.

Second, if the substitute motion failed, the chair would then deal with the second (now the last) motion on the floor, the motion to amend. The discussion and debate would focus strictly on the amendment (should the committee be five or 10 members). If the motion to amend passed, the chair would then move to consider the main motion (the first motion) as amended. If the motion to amend failed, the chair would then move to consider the main motion (the first motion) in its original format, not amended.

Third, the chair would now deal with the first motion that was placed on the floor. The original motion would either be in its original format (five-member committee), or if amended, would be in its amended format (10-member committee). The question on the floor for discussion and decision would be whether a committee should plan and put on the annual fundraiser.

To Debate or Not to Debate
The basic rule of motions is that they are subject to discussion and debate. Accordingly, basic motions, motions to amend, and substitute motions are all eligible, each in their turn, for full discussion before and by the body. The debate can continue as long as members of the body wish to discuss an item, subject to the decision of the chair that it is time to move on and take action.

There are exceptions to the general rule of free and open debate on motions. The exceptions all apply when there is a desire of the body to move on. The following motions are not debatable (that is, when the following motions are made and seconded, the chair must immediately call for a vote of the body without debate on the motion):

Motion to adjourn. This motion, if passed, requires the body to immediately adjourn to its next regularly scheduled meeting. It requires a simple majority vote.

Motion to recess. This motion, if passed, requires the body to immediately take a recess. Normally, the chair determines the length of the recess which may be a few minutes or an hour. It requires a simple majority vote.

Motion to fix the time to adjourn. This motion, if passed, requires the body to adjourn the meeting at the specific time set in the motion. For example, the motion might be: “I move we adjourn this meeting at midnight.” It requires a simple majority vote.

The motion to amend. If a member wants to change a basic motion that is before the body, they would move to amend it. A motion to amend might be: “I move that we amend the motion to have a 10-member committee.” A motion to amend takes the basic motion that is before the body and seeks to change it in some way.

The substitute motion. If a member wants to completely do away with the basic motion that is before the body, and put a new motion before the body, they would move a substitute motion. A substitute motion might be: “I move a substitute motion that we cancel the annual fundraiser this year.”
“Motions to amend” and “substitute motions” are often confused, but they are quite different, and their effect (if passed) is quite different.

A motion to amend seeks to retain the basic motion on the floor, but modify it in some way. A substitute motion seeks to throw out the basic motion on the floor, and substitute a new and different motion for it. The decision as to whether a motion is really a “motion to amend” or a “substitute motion” is left to the chair. So if a member makes what that member calls a “motion to amend,” but the chair determines that it is really a “substitute motion,” then the chair’s designation governs.

A “friendly amendment” is a practical parliamentary tool that is simple, informal, saves time and avoids bogging a meeting down with numerous formal motions. It works in the following way: In the discussion on a pending motion, it may appear that a change to the motion is desirable or may win support for the motion from some members. When that happens, a member who has the floor may simply say, “I want to suggest a friendly amendment to the motion.” The member suggests the friendly amendment, and if the maker and the person who seconded the motion pending on the floor accepts the friendly amendment, that now becomes the pending motion on the floor. If either the maker or the person who seconded rejects the proposed friendly amendment, then the proposer can formally move to amend.

Multiple Motions Before the Body
There can be up to three motions on the floor at the same time.

The chair can reject a fourth motion until the chair has dealt with the three that are on the floor and has resolved them. This rule has practical value. More than three motions on the floor at any given time is confusing and unwieldy for almost everyone, including the chair.

When there are two or three motions on the floor (after motions and seconds) at the same time, the vote should proceed first on the last motion that is made. For example, assume the first motion is a basic “motion to have a five-member committee to plan and put on our annual fundraiser.” During the discussion of this motion, a member might make a second motion to “amend the main motion to have a 10-member committee, not a five-member committee to plan and put on our annual fundraiser.” And perhaps, during that discussion, a member makes yet a third motion as a “substitute motion that we not have an annual fundraiser this year.” The proper procedure would be as follows:

Page 89 of 93 ends

15.B

Page 887 of 2163 ends

5 Motion to close nominations. When choosing officers of the body (such as the chair), nominations are in order either from a nominating committee or from the floor of the body. A motion to close nominations effectively cuts off the right of the minority to nominate officers and it requires a two-thirds vote to pass.

Motion to object to the consideration of a question. Normally, such a motion is unnecessary since the objectionable item can be tabled or defeated straight up. However, when members of a body do not even want an item on the agenda to be considered, then such a motion is in order. It is not debatable, and it requires a two-thirds vote to pass.

Motion to suspend the rules. This motion is debatable, but requires a two-thirds vote to pass. If the body has its own rules of order, conduct or procedure, this motion allows the body to suspend the rules for a particular purpose. For example, the body (a private club) might have a rule prohibiting the attendance at meetings by non-club members. A motion to suspend the rules would be in order to allow a non-club member to attend a meeting of the club on a particular date or on a particular agenda item.

Counting Votes
The matter of counting votes starts simple, but can become complicated.

Usually, it’s pretty easy to determine whether a particular motion passed or whether it was defeated. If a simple majority vote is needed to pass a motion, then one vote more than 50 percent of the body is required. For example, in a five-member body, if the vote is three in favor and two opposed, the motion passes. If it is two in favor and three opposed, the motion is defeated.

If a two-thirds majority vote is needed to pass a motion, then how many affirmative votes are required? The simple rule of thumb is to count the “no” votes and double that count to determine how many “yes” votes are needed to pass a particular motion. For example, in a seven-member body, if two members vote “no” then the “yes” vote of at least four members is required to achieve a two-thirds majority vote to pass the motion.

What about tie votes? In the event of a tie, the motion always fails since an affirmative vote is required to pass any motion. For example, in a five-member body, if the vote is two in favor and two opposed, with one member absent, the motion is defeated.

Vote counting starts to become complicated when members vote “abstain” or in the case of a written ballot, cast a blank (or unreadable) ballot. Do these votes count, and if so, how does one count them? The starting point is always to check the statutes.

In California, for example, for an action of a board of supervisors to be valid and binding, the action must be approved by a majority of the board. (California Government Code Section 25005.) Typically, this means three of the five members of the board must vote affirmatively in favor of the action. A vote of 2-1 would not be sufficient. A vote of 3-0 with two abstentions would be sufficient. In general law cities in Motion to table. This motion, if passed, requires discussion of the agenda item to be halted and the agenda item to be placed on “hold.” The motion can contain a specific time in which the item can come back to the body. “I move we table this item until our regular meeting in October.” Or the motion can contain no specific time for the return of the item, in which case a motion to take the item off the table and bring it back to the body will have to be taken at a future meeting. A motion to table an item (or to bring it back to the body) requires a simple majority vote.

Motion to limit debate. The most common form of this motion is to say, “I move the previous question” or “I move the question” or “I call the question” or sometimes someone simply shouts out “question.” As a practical matter, when a member calls out one of these phrases, the chair can expedite matters by treating it as a “request” rather than as a formal motion. The chair can simply inquire of the body, “any further discussion?” If no one wishes to have further discussion, then the chair can go right to the pending motion that is on the floor.

However, if even one person wishes to discuss the pending motion further, then at that point, the chair should treat the call for the “question” as a formal motion, and proceed to it.

When a member of the body makes such a motion (“I move the previous question”), the member is really saying: “I’ve had enough debate. Let’s get on with the vote.” When such a motion is made, the chair should ask for a second, stop debate, and vote on the motion to limit debate. The motion to limit debate requires a two-thirds vote of the body.

Note: A motion to limit debate could include a time limit. For example: “I move we limit debate on this agenda item to 15 minutes.” Even in this format, the motion to limit debate requires a twothirds vote of the body. A similar motion is a motion to object to consideration of an item. This motion is not debatable, and if passed, precludes the body from even considering an item on the agenda. It also requires a two-thirds vote.

Majority and Super Majority Votes
In a democracy, a simple majority vote determines a question. A tie vote means the motion fails. So in a seven-member body, a vote of 4-3 passes the motion. A vote of 3-3 with one abstention means the motion fails. If one member is absent and the vote is 3-3, the motion still fails.

All motions require a simple majority, but there are a few exceptions.

The exceptions come up when the body is taking an action which effectively cuts off the ability of a minority of the body to take an action or discuss an item. These extraordinary motions require a two-thirds majority (a super majority) to pass:

Motion to limit debate. Whether a member says, “I move the previous question,” or “I move the question,” or “I call the question,” or “I move to limit debate,” it all amounts to an attempt to cut off the ability of the minority to discuss an item, and it requires a two-thirds vote to pass.

Page 90 of 93 ends

15.B

Page 888 of 2163 ends

6 Now, exactly how does a member cast an “abstention” vote? Any time a member votes “abstain” or says, “I abstain,” that is an abstention. However, if a member votes “present” that is also treated as an abstention (the member is essentially saying, “Count me for purposes of a quorum, but my vote on the issue is abstain.”) In fact, any manifestation of intention not to vote either “yes” or “no” on the pending motion may be treated by the chair as an abstention. If written ballots are cast, a blank or unreadable ballot is counted as an abstention as well.

Can a member vote “absent” or “count me as absent?” Interesting question. The ruling on this is up to the chair. The better approach is for the chair to count this as if the member had left his/her chair and is actually “absent.” That, of course, affects the quorum. However, the chair may also treat this as a vote to abstain, particularly if the person does not actually leave the dais.

The Motion to Reconsider
There is a special and unique motion that requires a bit of explanation all by itself; the motion to reconsider. A tenet of parliamentary procedure is finality. After vigorous discussion, debate and a vote, there must be some closure to the issue. And so, after a vote is taken, the matter is deemed closed, subject only to reopening if a proper motion to consider is made and passed.

A motion to reconsider requires a majority vote to pass like other garden-variety motions, but there are two special rules that apply only to the motion to reconsider.

First, is the matter of timing. A motion to reconsider must be made at the meeting where the item was first voted upon. A motion to reconsider made at a later time is untimely. (The body, however, can always vote to suspend the rules and, by a two-thirds majority, allow a motion to reconsider to be made at another time.)
Second, a motion to reconsider may be made only by certain members of the body. Accordingly, a motion to reconsider may be made only by a member who voted in the majority on the original motion. If such a member has a change of heart, he or she may make the motion to reconsider (any other member of the body — including a member who voted in the minority on the original motion — may second the motion). If a member who voted in the minority seeks to make the motion to reconsider, it must be ruled out of order. The purpose of this rule is finality. If a member of minority could make a motion to reconsider, then the item could be brought back to the body again and again, which would defeat the purpose of finality.

If the motion to reconsider passes, then the original matter is back before the body, and a new original motion is in order. The matter may be discussed and debated as if it were on the floor for the first time.

California, as another example, resolutions or orders for the payment of money and all ordinances require a recorded vote of the total members of the city council. (California Government Code Section 36936.) Cities with charters may prescribe their own vote requirements. Local elected officials are always well-advised to consult with their local agency counsel on how state law may affect the vote count.

After consulting state statutes, step number two is to check the rules of the body. If the rules of the body say that you count votes of “those present” then you treat abstentions one way. However, if the rules of the body say that you count the votes of those “present and voting,” then you treat abstentions a different way. And if the rules of the body are silent on the subject, then the general rule of thumb (and default rule) is that you count all votes that are “present and voting.” Accordingly, under the “present and voting” system, you would NOT count abstention votes on the motion. Members who abstain are counted for purposes of determining quorum (they are “present”), but you treat the abstention votes on the motion as if they did not exist (they are not “voting”). On the other hand, if the rules of the body specifically say that you count votes of those “present” then you DO count abstention votes both in establishing the quorum and on the motion. In this event, the abstention votes act just like “no” votes.

How does this work in practice?
Here are a few examples.

Assume that a five-member city council is voting on a motion that requires a simple majority vote to pass, and assume further that the body has no specific rule on counting votes. Accordingly, the default rule kicks in and we count all votes of members that are “present and voting.” If the vote on the motion is 3-2, the motion passes. If the motion is 2-2 with one abstention, the motion fails.

Assume a five-member city council voting on a motion that requires a two-thirds majority vote to pass, and further assume that the body has no specific rule on counting votes. Again, the default rule applies.

If the vote is 3-2, the motion fails for lack of a two-thirds majority. If the vote is 4-1, the motion passes with a clear two-thirds majority. A vote of three “yes,” one “no” and one “abstain” also results in passage of the motion. Once again, the abstention is counted only for the purpose of determining quorum, but on the actual vote on the motion, it is as if the abstention vote never existed — so an effective 3-1 vote is clearly a two-thirds majority vote.

Now, change the scenario slightly. Assume the same five-member city council voting on a motion that requires a two-thirds majority vote to pass, but now assume that the body DOES have a specific rule requiring a two-thirds vote of members “present.” Under this specific rule, we must count the members present not only for quorum but also for the motion. In this scenario, any abstention has the same force and effect as if it were a “no” vote. Accordingly, if the votes were three “yes,” one “no” and one “abstain,” then the motion fails. The abstention in this case is treated like a “no” vote and effective vote of 3-2 is not enough to pass two-thirds majority muster.

Page 91 of 93 ends

15.B

Page 889 of 2163 ends

7 Appeal. If the chair makes a ruling that a member of the body disagrees with, that member may appeal the ruling of the chair. If the motion is seconded, and after debate, if it passes by a simple majority vote, then the ruling of the chair is deemed reversed.

Call for orders of the day. This is simply another way of saying, “return to the agenda.” If a member believes that the body has drifted from the agreed-upon agenda, such a call may be made. It does not require a vote, and when the chair discovers that the agenda has not been followed, the chair simply reminds the body to return to the agenda item properly before them. If the chair fails to do so, the chair’s determination may be appealed.

Withdraw a motion. During debate and discussion of a motion, the maker of the motion on the floor, at any time, may interrupt a speaker to withdraw his or her motion from the floor. The motion is immediately deemed withdrawn, although the chair may ask the person who seconded the motion if he or she wishes to make the motion, and any other member may make the motion if properly recognized.

Special Notes About Public Input
The rules outlined above will help make meetings very publicfriendly. But in addition, and particularly for the chair, it is wise to remember three special rules that apply to each agenda item:

Rule One: Tell the public what the body will be doing.

Rule Two: Keep the public informed while the body is doing it.

Rule Three: When the body has acted, tell the public what the body did.

Courtesy and Decorum
The rules of order are meant to create an atmosphere where the members of the body and the members of the public can attend to business efficiently, fairly and with full participation. At the same time, it is up to the chair and the members of the body to maintain common courtesy and decorum. Unless the setting is very informal, it is always best for only one person at a time to have the floor, and it is always best for every speaker to be first recognized by the chair before proceeding to speak.

The chair should always ensure that debate and discussion of an agenda item focuses on the item and the policy in question, not the personalities of the members of the body. Debate on policy is healthy, debate on personalities is not. The chair has the right to cut off discussion that is too personal, is too loud, or is too crude.

Debate and discussion should be focused, but free and open. In the interest of time, the chair may, however, limit the time allotted to speakers, including members of the body.

Can a member of the body interrupt the speaker? The general rule is “no.” There are, however, exceptions. A speaker may be interrupted for the following reasons:

Privilege. The proper interruption would be, “point of privilege.” The chair would then ask the interrupter to “state your point.” Appropriate points of privilege relate to anything that would interfere with the normal comfort of the meeting. For example, the room may be too hot or too cold, or a blowing fan might interfere with a person’s ability to hear.

Order. The proper interruption would be, “point of order.” Again, the chair would ask the interrupter to “state your point.” Appropriate points of order relate to anything that would not be considered appropriate conduct of the meeting. For example, if the chair moved on to a vote on a motion that permits debate without allowing that discussion or debate.

Page 92 of 93 ends

15.B

Page 890 of 2163 ends

1400 K Street, Sacramento, CA 95814
(916) 658-8200 | Fax (916) 658-8240
www.cacities.org
To order additional copies of this publication, call (916) 658-8200. $10
© 2011 League of California Cities. All rights reserved.

Printed on recycled paper.

Page 93 of 93 ends

15.B

Page 891 of 2163 ends
Page 892 of 2163 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jan 25 2022
Department: Administration
Submitted by: Christopher Lopez, City Manager
Christopher Lopez, City Manager;
☐ Receive and File ☐ Consent Calendar ☒ Business Item ☐ Public Hearing TITLE:

Discussion of the Regional Parks and Open Space District for the County of Riverside in Partnership with the State of California for the Off-Highway Motor Vehicle Recreation Division's Initiation of a Feasibility Study for Site Selection Choices for a Future Public Off-Highway Motor Vehicle Recreation Park
RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Discuss the Regional Parks and Open Space District for the County of Riverside in partnership with the State of California for the Off-Highway Motor Vehicle Recreation Division's initiation of a feasibility study to develop a master plan for site selection choices for a future public OHV Park and provide possible direction to staff.

BACKGROUND:

As stated on the Riverside County Parks OHV website, “The Regional Parks and Open Space District for the County of Riverside, in partnership with the State of California Off-Highway Motor Vehicle Recreation Division, is initiating a feasibility study to develop a master plan and site selection choices for a future public OHV Park. The plan will take into account land ownership, sensitive lands, concerns of noise, dust, cultural resources and environmental protection, and private rights when considering potential OHV Park Sites. Stakeholder and community input will be integrated into the planning efforts.

The plan will look at the entire County but will narrow it down to six potential sites which will further be narrowed down to three feasible sites.”
ANALYSIS:

This discussion is being included on the agenda to allow the City Council an opportunity to discuss their position on the proposed locations, which are listed below and specific maps located here:

Page 1 of 3 ends

15.C

Page 893 of 2163 ends

https://ktuagis.maps.arcgis.com/apps/MapSeries/index.htmlappid=24ffbeb8031c46648cc26f54db00d 7db

1. Banning North Site

2. Banning South Site

3. Coachella South Site

4. Diamond Lake Site

5. Double Butte Park Site

6. Twin Pines Ranch Site
The link above allows residents to provide their comments and suggestions through an online survey tool, which will close on January 28, 2022, in addition to a virtual meeting to be held on January 27, 2022. The flier with this information is attached for reference.

Additional information can be found at the site links below:
https://www.rivcoparksohv.org/
https://www.rivcoparksohv.org/ohv-feasibility-study-tier-1-report DISCUSSION:

The Council may want to discuss potential opportunities and challenges with the proposed Diamond Lake site which is listed above.

STRATEGIC PLAN INTEGRATION:

GOAL THREE: COMMUNITY ENGAGEMENT
To connect and participate in a constant dialogue between members of the community, City staff, and elected officials to promote togetherness and positivity.

Objective 1: Deliver messaging to the Community that connects, is consistent, and relevant.

Objective 2: Increase transparency for the public.

Objective 3: Increase the community's pride within the City.

FISCAL IMPACT:

There is no fiscal impact.

ATTACHMENT(S):

Attachment 1: OHV Information Flyer

Page 2 of 3 ends

15.C

Page 894 of 2163 ends

1/1 Page 3 of 3

15.C

Page 895 of 2163 ends
Page 896 of 2163 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jan 25 2022
Department: Administration
Submitted by: Christopher Lopez, City Manager
Veronica Allen, Management Analyst;
☐ Receive and File ☐ Consent Calendar ☒ Business Item ☐ Public Hearing TITLE:

A Resolution of the City Council of the City of Hemet, California, Authorizing Acceptance of Coronavirus State and Local Fiscal Recovery Funds Established by the American Rescue Plan Act of 2021 in the Amount of $21,674,344.00 and Discussion on Proposed Projects for Funding RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Authorize the acceptance of the American Rescue Plan - Coronavirus State and Local Fiscal Recovery Fund in the amount of $21,674,344.00; and
Discuss proposed projects for funding from the American Rescue Plan – Coronavirus State and Local Fiscal Recovery Fund that directly aligns with the City’s adopted Strategic Plan, Final Treasury Rules, and provide direction.

BACKGROUND:

The American Rescue Plan Act of 2021 (ARPA) is a $1.9 trillion economic stimulus bill. On March 11, 2021, President Biden signed the American Rescue Plan Act 2021, which launched the Coronavirus State and Local Fiscal Recovery Funds (SLFRF). SLFRF will provide $350 billion in emergency funding for state and local governments. The emergency economic stimulus bill provides fiscal aid to address the ongoing COVID-19 public health crisis.

The ARPA states that funding can be used to:

1. Respond to COVID-19 or its Economic Impacts;

2. Replace revenues lost due to COVID-19;

3. Provide premium pay to eligible essential workers; and

4. Invest in water, sewer, and broadband infrastructure.

Of the $350 billion economic stimulus bill, the City will receive almost $22 million in direct one-time funding. This one-time funding will provide significant financial resources for health and safety across the City while also making investments that improve our resident's quality of life.

Page 1 of 27 ends

15.D

Page 897 of 2163 ends

The City's Strategic Plan, approved by Council on June 23, 2021, is the roadmap for the City's workplans. The City's Council Adopted Goals include the following:

1. Quality of Life

2. Economic Opportunity

3. Community Engagement

4. Partnership and Collaboration

5. Organizational Effectiveness
On July 13, 2021, The Hemet City Council received a presentation and discussed potential uses of the ARPA SLFRF funding. Community engagement is a big component of the SLFRF funding and a survey was launched using Polco, Inc., an ARPA Engagement package. The surveys were launched to gather input from the community on the areas of concern and on the uses for this funding.

ANALYSIS:

SLFRF funding will be received in two disbursements. The first $10 million has been received and the second disbursement is anticipated within the next 12 months. The funds may be used for any allowed purpose starting on March 3, 2021, and must be encumbered by December 31, 2024. Funds that are encumbered during this period must be spent by December 31, 2026. Use of funds for projects outside of these dates is prohibited. Funds not spent by the end of 2026 must be returned to the federal government.

In order to get to this discussion, staff took the following actions:

1. Preliminary discussion with Council on July 13, 2021.

2. Polco, Inc. was contracted to conduct an ARPA Engagement Survey for residents and businesses to provide input on the community needs, areas of concern, and provide feedback on how to prioritize ARPA funding. Surveys were made available from September 9 to November 8, 2021.

3. Each department/division was asked to provide a request for funding that aligned with the Strategic Plan and Council feedback from July 13, 2021.

4. Analysis of Polco survey feedback to determine areas of concern and where funding should be prioritized.

5. Initial review by City staff of submitted projects against Treasury guidelines.

6. Legal analysis was conducted by the City Attorney's Office on January 6, 2022, to ensure proposed projects met with Treasury's Final Rule.

7. Analysis which included Polco feedback, Treasury Final Rule alignment, Strategic Plan Alignment, and initial Council discussion from July 13, 2021.

Initial Council Discussion
On July 13, 2021, the Hemet City Council received a presentation and discussed the potential uses of the ARPA - SLFRF funding. In that meeting, the Council indicated an initial preference to prioritize and use the funding to support public health resources and reduce the negative impacts of the pandemic.

During the discussion, Council stated they would like to see homelessness solutions to help with the homelessness concerns in the City along with providing mental health services. There are many households that are in arrears with utility payments and rent due to the pandemic and assistance to these impacted households is needed. Also discussed extensively was the need for increased outdoor activity. This became evident during the mandatory pandemic. The only activity that was allowed was outdoors therefore an increase in outdoor exercise and parks, a skate park, and youth projects would enhance the ability of communities ability to maintain a healthy state of mind. Also mentioned were food delivery to those in need, water and sewer infrastructure, and small business assistance. The

Page 2 of 27 ends

15.D

Page 898 of 2163 ends

Council also supported hearing feedback from the community regarding these funds before deciding upon funding allocations. The areas of priority discussed by the Council were:
• Homelessness Solutions
• Mental Health services
• Housing
• Utility Providers
o People in arrears with utility payments and rent; assist people to get caught up • Tourism, travel, and hospitality
• Simpson Center – form into a Community Center
• Outdoor exercise - parks
• Skate Park
• Youth Projects
• Food delivery to those in need - work with non-profit agencies • Water and Sewer infrastructure
• Small Business Assistance
After this discussion the City Manager's Office took the lead in gathering proposals from operations given the Council direction and discussion. This process involved each department/division completing a request for funding that included a description of the project, cost estimate, a project objective, and how the project aligns with the Strategic Plan. Each request for funding that was submitted was reviewed by City staff to ensure it met Treasury guidelines and a spreadsheet was created listing all of the projects (Attachment 1).

Department/Division Proposals
City operations brought forward the following projects to the City Manager's Office for consideration:
• Police Multi-purpose Mobile Command Post and Emergency Operations Center • Police External Safety and Infrastructure upgrade at the Main Public Safety Facilities • Police Community Center & Citywide Training Facility
• Police Department Job Training/Employment Support
• Fire - Replace Zoll Defibrillator/Heart Monitors
• Fire Station Facility Evaluation/Retrofit/Remodel as necessary; Internal Fire Station System Upgrades
• Fire Apparatus Replacement - 2 KME Engines
• Small Business Infrastructure Grant Program
• Homelessness Services
• Public Works Apprentice Program
• Youth Employment Program
• Household Rent/Mortgage Assistance Program
• Community Development Contactless Development Software • Community Development Neighborhood Enhancement Project • Community Development Economic Development Strategic Plan • Library - Refresh Firewall
• Library - Children's Patio
• Utility Bill Relief Program
• Park Renovations
• Outdoor Fitness Court
• Skate Park
• Pickleball Court
• Public Works Sewer Infrastructure projects
• Public Works Water Infrastructure projects

Page 3 of 27 ends

15.D

Page 899 of 2163 ends

• City Clerk - Records Management System
• Information Technology - Critical Infrastructure/Cybersecurity Modernization • Information Technology - Telephone and Network Modernization • Information Technology - Data Center Modernization
Attachment 1 reflects all of the projects submitted and the highlighted projects on the bottom of the spreadsheet are considered not eligible as they do not meet Treasury Guidelines. City Manager staff reviewed the submitted projects against Treasury guidelines in the Interim Final Rule (subsequently adopted on January 6, 2022). Since the adoption of the Treasury's Final Rule, the City Attorney's Office was asked to review all the ARPA projects to ensure the projects considered eligible and ineligible were accurately categorized. The City Attorney's Office provided their legal opinion on the submitted projects and those legally eligible have been noted. The Council has been provided this opinion.

The following projects most likely do not meet Treasury guidelines based on legal's review. • Police Multi-purpose Mobile Command Post and Emergency Operations Center • Police External Safety and Infrastructure upgrade at the Main Public Safety Facilities • Police Community Center & Citywide Training Facility
• Fire Station Facility Evaluation/Retrofit/Remodel, Internal Fire Station System Upgrades • Fire Apparatus Replacement - 2 KME Engines
• City Clerk - Records Management System
• Community Development Neighborhood Enhancement Project • Community Development Economic Development Strategic Plan Revenue Loss
Initially, the Treasury's requirements on Revenue Loss was very definitive. If cities could not document revenue loss, cities were deemed ineligible to utilize any of the SLFRF funding for projects considered provisions of 'general government'. The City did not have revenue loss when the Treasury's Interim Final Rule was in place. When Treasury adopted the Final Rule for the SLFRF funding on January 6, 2022, one of the most significant changes was the modification to the lost revenue provision which allows recipients to use SLFRF funds in the amount up to the recipient’s lost revenue for provisions of “government services.”
“Government services” generally include any service traditionally provided by a government, including the construction of roads and other infrastructure; provision of public safety and other services; health and educational services; modernization of cybersecurity, including hardware, software, and protection of critical infrastructure; health services; environmental remediation; school or educational services; and the provision of police, fire, and other public safety services.

With this revision, the City is eligible to use the “revenue replacement category” because the Treasury is allowing a “standard allowance” of $10 million. Under revenue replacement, cities have broad latitude to use funds for government services due to the pandemic so long as other restrictions do not apply.

Some of the projects listed above as likely ineligible projects could potentially be funded from revenue replacement, as may almost all operations of the City of Hemet, with certain exceptions (i.e., pension costs, judgments/settlements). This 'standard allowance' is not additional funding however part of the allocation the City has received.

With this change in the Final Rule regarding the revenue replacement category and 'standard allowance', this brings the first major policy item for the Council: Does the Council wish to utilize the 'standard allowance' of $10 million? Staff seeks direction on this item.

Page 4 of 27 ends

15.D

Page 900 of 2163 ends

If the Council approves this standard allowance, the Council would still be required to allocate approximately $12M in ARPA funding for eligible projects under the Final Rule.

Community Engagement and Feedback
Community engagement is an important component of the SLFRF funding. The City partnered with Polco, Inc. for an ARPA Engagement Package to provide a survey for residents and businesses to gather feedback from the community. The survey was shared on all media platforms to encourage participation. The survey was deployed from September 9, 2021 to November 8, 2021. The survey received 273 residents and 92 business responses. Approximately 57.6 percent of the respondents reported being property owners in the City. Below reflects the age range of the survey respondents.

The majority of the respondents were between 65-74 years of age. Also reflected is the age and gender of survey respondents.

Page 5 of 27 ends

15.D

Page 901 of 2163 ends

The four critical areas of focus are the same for residents and businesses who responded: Safety, Economy, Inclusivity, Education, Arts, and Culture. Safety refers to the overall feeling of safety in Hemet. Economy refers to the overall economic health of Hemet. Inclusivity refers to the resident's connection and engagement with their community. Lastly, Education, Arts, and Culture refer to the overall opportunities for education, culture, and the arts in Hemet. The information below reflects the percentages from the Resident survey of Critical Focus topics. This is located on p. 14 in Section 4 of the Resident survey and p. 12 of the Business survey. The percentages below reflect the percentages from the Resident survey.

The business respondent's feedback on the most important funding categories are as follows: economic aid to small businesses, services to promote healthy childhood environments, and services to address behavioral healthcare demand increase as a result of the pandemic.

Page 6 of 27 ends

15.D

Page 902 of 2163 ends

The resident respondent's feedback on the most important funding categories are as follows: services to address behavioral healthcare demand increase as a result of the pandemic, economic aid to households experiencing housing, food, or other financial hardships, and financial aid to high poverty school districts to help reduce gaps in educational achievement.

Page 7 of 27 ends

15.D

Page 903 of 2163 ends

The common theme between the business and resident survey on important funding categories is providing services to address behavioral healthcare demand increase as a result of the pandemic.

Other common themes in the survey results were:
• On community livability between residents and businesses:
o The City is rated high on Community Design and Utilities o The City is rated low on Economy and Education, Arts, and Culture • On ARPA Biggest Challenges between residents and businesses:
o Knowing what services are available in the community for residents and businesses The data from the Resident survey reflects the various areas of interest and its importance to the residents in Hemet. Below is the resident respondent's feedback:

In Section 6, Community Design (p. 16) of the Resident survey, 55% of the respondents state the importance of the overall design or layout of Hemet's residential and commercial areas (e.g. homes, buildings, streets, parks, etc.) is essential or very important.

In Section 7, Economy (p. 19) of the Resident survey, 72% of the respondents state the importance of overall economic health of Hemet is essential or very important.

In Section 8, Education, Arts, and Culture (p. 23) of the Resident survey, 72% of the respondents state the importance of overall opportunities for education, culture, and the arts is essential or very important.

Page 8 of 27 ends

15.D

Page 904 of 2163 ends

In Section 9, Health and Wellness (p. 26) of the Resident survey, 83% of the respondents state the importance of overall health and wellness opportunities in Hemet is essential or very important.

In Section 10, Inclusivity (p. 30) of the Resident survey, 79% of the respondents state the importance of residents' connection and engagement with their community is essential or very important.

In Section 11, Mobility (p. 34) of the Resident survey, 54% of the respondents state the importance of overall quality of the transportation system (auto, bicycle, foot, bus) in Hemet is essential or very important.

In Section 12, Natural Environment (p. 36) of the Resident survey, 79% of the respondents state the importance of overall quality of the natural environment in Hemet is essential or very important.

In Section 13, Parks and Recreation (p. 38) of the Resident survey, 74% of the respondents state the importance of overall quality of parks and recreation opportunities is essential or very important.

In Section 14, Safety (p. 40) of the Resident survey, 98% of the respondents state the importance of the overall feeling of safety in Hemet is essential or very important.

In Section 15, Utilities (p. 42) of the Resident survey, 78% of the respondents state the importance of the overall quality of the utility infrastructure in Hemet (water, sewer, stormwater, electric/gas, broadband) is essential or very important.

The complete results can be accessed with the link to the engagement survey results below. https://www.hemetca.gov/DocumentCenter/View/7611/Hemet_ARPA_Resident_Nov2021 https://www.hemetca.gov/DocumentCenter/View/7612/Hemet_ARPA_Business_Nov2021 DISCUSSION:

The basis for the recommended proposed projects is based on the foundation formula created which included the following: project alignment with the Strategic Plan + initial Council ARPA Priorities + project is eligible under Final Rule + importance to community based on feedback from the Polco survey. These highly recommended projects meet all four foundation basis. Projects that meet 3 of the criteria would be considered important however are missing one of the elements in the foundation formula. Projects that did not meet the criteria did not meet the basic Treasury guideline based on the Treasury's Final Rule and is considered an ineligible project.

Within the overall categories of eligible uses, recipients have some flexibility to decide how best to use the funding to meet the needs of their communities. Specific to Hemet, staff prioritized projects that would provide long-term benefits to those impacted by COVID-19. The proposed projects include resources to support the public health response, funding to promote and stimulate economic growth and enhance fiscal stability of the City, as well as programs that support nonprofit and local business community. The recommended projects provide benefits Citywide and make strategic investments in the City's infrastructure to connect the community by improving access to parks and commerce.

The proposed American Rescue Plan - State and Local Fiscal Recovery Fund Projects for consideration and discussion are listed below (outlined in Attachment 1):

Supporting the Public Health Response: $6,794,977

Page 9 of 27 ends

15.D

Page 905 of 2163 ends

Funds may be used to support public health expenditures and COVID-19 mitigation efforts. The City is recommending that funding be used to cover eligible expenditures including personal protective equipment and investments in public facilities to meet pandemic operational needs. The COVID-19 pandemic has highlighted the vital role that technology plays in our ability to communicate to the public and ensure critical public safety activities continue, and the necessity of providing online self-serve options to enable customers to access City services. Project funds are allocated to provide the necessary technology upgrades to enable the City to continue to responding to the pandemic and provide long-term benefits to customers, business, citizens, and City staff with upgrades to the City telephone network, data center, and contactless development software for Community Development.

This includes funding towards cost related to emergency medical response during the pandemic by the Fire and Police Department. To continue to support small businesses affected by the COVID-19 pandemic and mandatory stay at home orders, a small business outdoor dining grant will be provided for enhancing or construction of outdoor dining for eligible restaurants, bars, and other qualifying businesses. Funding is proposed for a Crime Violence Intervention project. Safety is ranked as essential with the community based on the community engagement survey and this project will assist in reducing crime and violence.
• $5,261,473 for Citywide General COVID expenses and response • $500,000 for Small Business Assistance - to construct new/enhance outdoor dining • 800,000 for a Community Violence Intervention Program • $233,504 for Fire and Police Medical Response Costs
Addressing Negative Economic Impacts: $3,211,920
Eligible activities in this category including speeding the recovery of the tourism, travel, and hospitality sectors and providing assistance to workers, households, small businesses, impacted industries, and the public sector. Funding will be available to support economic development through non-profit agency, household mortgage and utility assistance and employment programs.

In order to support and address the needs of the nonprofit community, staff is recommending that $500,000 in SLFRF funds be set aside for Non-profit Community Grant Assistance program. The program eligibility and requirements have not been determined, but staff are assessing the needs and reviewing existing programs with other City agencies in order to develop the criteria. For example, the City of San Marcos created an operational grants program to support local nonprofits. Their guidelines document and a summary of the eligibility and criteria process is available on their website.

Households were impacted during the pandemic due to loss of job, illness, or reduced work hours which resulted in being in arrears with rent/mortgage and utility payments. Funding is recommended to provide a Utility Bill Relief program and Household Rent/Mortgage Assistance. • $500,000 for Community Non-Profit Agency grant assistance • $1,500,000 for Utility Bill Relief Program
• $500,000 for Household Rent/Mortgage Assistance Program • $340,000 for Police Department Job training/Employment Support • $223,170 for Public Works Apprentice Program
• $148,750 for Youth Employment Program

Page 10 of 27 ends

15.D

Page 906 of 2163 ends

Services to Disproportionately Impacted Communities: $5,714,545 In recognition of the disproportionate negative economic impacts on certain communities and populations, the Treasury guidance allows for programs and services designed to build stronger neighborhoods and communities and to address health disparities and the social determinants of health. Since the onset of the pandemic, there has been a significant increase in demand for public outdoor spaces. Funds will be used to make investments in parks and other public outdoor recreation spaces, such as the construction of a pickleball court, outdoor fitness court, and Skate Park in Gibbel Park to promote healthier living environments and socialization to mitigate the spread of COVID-19.

Also an upgrade to the Library's Children's Patio to allow children a place for socialization outside of the home and promote healthy childhood environments.

Staff is recommending that $1.7 million in funds be used for citywide park improvements. Two of the parks are located in a qualified census tract where low to moderate income households are located.

Services to disproportionate communities also includes those individuals and families who are unhoused. Homelessness services is a recommended project which has already been approved by City Council.
• $1,183,307 for City Net Homelessness Services
• $175,000 for a Pickleball Court
• $277,988 for an Outdoor Fitness Court
• $1,728,250 for Citywide Park Improvements
• $1,950,000 for a Skate Park
• $50,000 Library Children's Patio
• $350,000 Library Firewall Refresh
Premium Pay: $972,500
ARPA allows funds for premium pay to public sector employees who performed essential work during the pandemic. This project has already been approved by City Council. • $972,500 for premium pay to public sector staff who performed essential work Investments in Water, Sewer, Broadband: $14,500,000
ARPA allows funds to be spent on projects that improve access to clean drinking water, improve wastewater and stormwater infrastructure systems, and provide access to high-quality broadband service. Staff is recommending that $3.0 million to be used for citywide sewer infrastructure projects that will replace aging and failing sewer lines throughout the City. Use $3.5 million to construct a new two-million-gallon potable water storage reservoir and $8.0 million for replacing aging and failing water transmission lines. These projects will maintain health and safety for residents by providing clean drinking water and improving the wastewater and stormwater systems. • $3,000,000 for Public Works Sewer Infrastructure projects • $11,500,000 for Public Works Water Infrastructure projects

Page 11 of 27 ends

15.D

Page 907 of 2163 ends

Administrative Costs: $222,300
ARPA allows administrative costs to cover the management of federal grant funds. This costs covers the ARPA engagement survey from Polco, Inc. and the grant management software system to assist in monitoring the financial data for reporting of the SLFRF funded projects. These projects have already been approved by City Council.
• $222,300 for a grant management software system and the Polco community engagement survey
The estimated total amount of the proposed projects is $31,416,242.04. The proposed project's total is over by $9,741,898.04 of the City's ARPA SLFRF allocation of $21,674,344.

Council Discussion
The ARPA SLFRF is an opportunity to provide services to the community due to the coronavirus pandemic and its effect on the community as a whole. The actions taken by the City Council by providing their priorities with the ARPA funding during the July 13th Council meeting, engaging the community for feedback with the Polco survey, review of the proposed projects to ensure they meet Treasury requirements and alignment with the Strategic Plan is the foundational formula used to recommend the proposed project to meet the needs of the community.

A total of $2,378,107 in projects listed below have already been approved by Council. This leaves $8,621,893 in SLFRF funding available for discussion if the Council chooses to utilize the standard allowance. Projects that have already been approved by the Council in the amount of $2,378,107 are the following:
• Homelessness Services with City Net in the amount of $1,183,307. This is a three-year contract to provide street outreach, engagement, and emergency shelter/bridge housing. • Premium Pay for public sector staff for essential work in the amount of $972,500. • Polco, Inc. Community Engagement survey and the eCivis Grant Management software system in the amount of $222,300 under Administrative Services.

Based on the Treasury Rule and unique needs of the City, the staff is recommending the City Council discuss and provided direction on the following:

1. Does the Council wish to utilize the 'standard allowance' of $10 million?

2. What is the Council's feedback on the ARPA eligible proposed projects for the distribution of funds based on the foundation formula of alignment with the City's Strategic Plan, the initial council priority discussion on July 13, 2021, meets Treasury Final Rule, and is essential or very important to the community based on the engagement survey is presented to Council for discussion.

3. Does the Council wish to approve specific projects as listed in the attachments, or prefer other projects that staff can explore?
In conclusion, The Project Matrix (Attachment 3) reflects the proposed projects to the foundation formula (project alignment with the Strategic Plan + project meets Council Priorities + project is eligible under Treasury Guidelines + importance to community-based on feedback from the Polco survey).

PREVIOUS COUNCIL ACTION:

Page 12 of 27 ends

15.D

Page 908 of 2163 ends

On July 13, 2021, this item was presented to the Hemet City Council to receive information on the American Rescue Plan - State and Local Fiscal Recovery Fund. The Council discussed priority areas for ARPA - SLFRF use of funding. The areas of discussion were:
• Homelessness Solutions
• Mental Health services
• Housing
• Utility Providers
o People in arrears with utility payments and rent; assist people to get caught up • Tourism, travel, and hospitality
• Simpson Center – form into a Community Center
• Outdoor exercise - parks
• Skate Park
• Youth Projects
• Food delivery to those in need - work with non-profit agencies • Water and Sewer infrastructure
• Small Business Assistance
STRATEGIC PLAN INTEGRATION:

GOAL ONE: QUALITY OF LIFE:

To ensure that Hemet is safe, clean, attractive and comfortable for all who live, work, and visit.

ARPA SLFRF proposed projects aligns with the Quality of Life goal by providing homelessness solutions for the City, providing needed services to impacted communities in the City, and enhancing the visual appearance of the community to make it attractive and reduce blight.

GOAL TWO: ECONOMIC OPPORTUNITY
To ensure that Hemet is a hub, with access to quality jobs, shopping options, and a varied and sustained tax base.

ARPA SLFRF proposed projects aligns with the Economic Opportunity goal by providing employment opportunities for disadvantaged community residents and providing resources for small businesses and non profit agencies.

GOAL THREE: COMMUNITY ENGAGEMENT
To connect and participate in a constant dialogue between members of the community, City staff, and elected officials to promote togetherness and positivity.

A key component in the ARPA SLFRF funding is community engagement. The Polco Engagement Community survey provides the ability for City businesses and residents to provide their input on areas of concern for ARPA funding. The survey increases transparency for the public and the City is able to bring the message to the Community that is consistent and relevant.

GOAL FOUR: PARTNERSHIP & COLLABORATION
To pursue partnerships that will increase the opportunities available to the community, including our businesses, unemployed, and youth populations.

ARPA SLFRF proposed projects aligns with the Partnership & Collaboration goal is the ability to develop concepts and program to increase opportunities for youth recreation, develop concepts and programs to enhance the quality of life services, and provide programs to offer support to the community's businesses.

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Page 13 of 27 ends

15.D

Page 909 of 2163 ends

ARPA SLFRF proposed projects aligns with the Organizational Effectiveness goal by assisting the City to operate in a financially sustainable manner and providing employment programs that will increase employee retention by training and creating future employment for residents affected by the pandemic.

FISCAL IMPACT:

No General Fund Impact. Funding for approved projects will be included in the FY 2022-2023 American Rescue Plan, Fund 270.

ATTACHMENT(S):

Attachment 1: ARPA SLFRF Proposed Projects-revised
Attachment 2: Resolution to Authorize Acceptance of State and Local Fiscal Recovery Funds established by the American Rescue Plan Act of 2021 in the Amount of $21,674,344 Attachment3: ARPA Proposed Project Matrix-revised
Attachment 4: ARPA Proposed Project Discussion Presentation

Page 14 of 27 ends

15.D

Page 910 of 2163 ends

City of Hemet Proposed ARPA SLFRF Projects
Category Recommendations Amount Percent Strategic Plan Alignment Exp Category Comments/Notes

1. Supporting the Public Health Response $6,794,977.00 21.63% City-Wide General COVID Expenses and Response
• Replacement of Zoll Defibrillator/Heart Monitors $322,000.00 Quality of Life 1.6 Replacement of 10 Zoll EKG monitor/defibrillator units in order to replace aging, beyond expected life of equipment • On-going personal protective equipment (PPE) needs $22,000.00 Quality of Life 1.5 Personal protective equipment for Code Compliance Neighborhood Enhancement Project • Investment in public facilities to meet pandemic operational needs $165,000.00 Organizational Effectiveness 1.7 Badge readers - adapting public facilities to implement COVID-19 mitigation tactic. • Investment in public facilities to meet pandemic operational needs $200,000.00 Organizational Effectiveness 1.7 Community Development Contactless Development Software - adapting public facilities to implement COVID-19 mitigation tactic.
• Ventilation Improvements in Key locations (Library) $1,052,473.00 Quality of Life 1.4 Library HVAC upgrade $1,000,000.00 Organizational Effectiveness 1.7
Criticial Infrastructure/Cybersecurity Modernization - Review and modernization of the City of Hemet’s enterprise-wide cybersecurity. Our City’s growing reliance on our critical technology infrastructure expands ever year. During COVID-19, this reliance grew exponentially overnight. Providing a secure remote work environment to facilitate continue City operations with residents and private businesses have pushed this infrastructure to its limits. At the same time, cyber criminals and nation-states have grasped this opportunity to conduct major cyber-attacks during the pandemic. These attacks on critical infrastructure can severely impact our ability to provide services to all sectors of our community. This project will review our current cyber security posture and implement necessary changes to protect us against existing and future threats to our critical infrastructure. This project impacts the success of every goal on the current strategic plan. The City is improving technology infrastructure as a COVID-19 mitigation tactic. $1,000,000.00 Organizational Effectiveness 1.7
Telephone and Network Modernization - Modernization of the City’s telephone system. Throughout COVID-19, the City’s phone system has played a vital link between the City, it’s businesses and residents. This system allowed businesses and residents to engage staff and connect with City services, including public safety while following local directives. For residents without access to broadband Internet, this system provided their only way to communicate with the City and its services. This systems age and lack of versatility showed throughout this period, impacting timely response to our businesses and residents.

This project would modernize this system, increasing the availability of remotely working staff to answer live calls, increase reliability, and reduce wait times through use of advanced technology and redesigned call workflows. As a part of our critical technology infrastructure, this system is foundational to ensure the successful implementation of other ARP projects by City departments and divisions. This project impacts the success of every goal on the current strategic plan. The City is improving technology infrastructure as a COVID-19 mitigation tactic. • Technology Upgrades to Streamline Operations Page 15 of 27

15.D

Page 911 of 2163 ends

City of Hemet Proposed ARPA SLFRF Projects
Category Recommendations Amount Percent Strategic Plan Alignment Exp Category Comments/Notes $1,500,000.00 Organizational Effectiveness 1.7
Data Center Modernization - Replacement of the City’s computer and storage environments at City Hall and Police Department. Our City’s growing reliance on our critical technology infrastructure expands ever year. During COVID-19, this reliance grew exponentially overnight. Many paper processes are being converted to digital, lessening the need for direct physical contact and interaction with businesses and residents. As part of Council approved documentation retention, paper documentation must be digitized for easier access and transparency. These moves have depleted available computer and storage resources to levels that impede successful completion of additional projects, including data backups. Replacement part availability of these older systems have been directly impacted due to supply chain shortages and component obsolescence. As a part of our critical technology infrastructure, continued operation of these systems is essential to the successful implementation of other ARP projects and Council strategic plan goals. This project would ensure a solid foundation for the successful implementation of future projects and strategic goals. This project impacts the success of every goal on the current strategic plan. The City is improving technology infrastructure as a COVID-19 mitigation tactic.

Small Business Infrastructure Grant (outdoor dining) $500,000.00 Quality of Life 1.12 Grants for construction or enhancement of outdoor dining in response to COVID-19 pandemic to mitigate spread of COVID-19.

Community Violence Intervention Program $800,000.00 Quality of Life 3.16 Partnership for Safe Communities collaboration with the City to provide analysis and intervention strategies and Crime intervention nonprofit agency collaboration to reduce crime in the City .

Emergency Medical Response Costs - Fire and Police $233,504.00 Quality of Life, Organizational Effectiveness 1.12 Cost of emergency response during COVID-19 pandemic (March 2020-Dec. 2021) for Fire and Police

2. Negative Economic Impacts $3,211,920.00 10.22%
Community Non-Profit Agency Grant Assistance $500,000.00 Economic Opportunity 2.10 $20K for to assist 25 non profit agencies with costs associated with affects of the pandemic (late rent, PPEs, etc.) Utility Bill Relief Program $1,500,000.00 Partnership & Collaboration 2.2 work with Non-profit agencies to distribute grants funds for utility bill relief to the community Household Rent/Mortgage Assistance Program $500,000.00 Quality of Life 2.2 work with Non-profit agencies to distribute grants funds for household rent/mortgage assistance to the community Police Department Job Training/Employment Support $340,000.00 Organizational Effectiveness, Partnership & Collaboration 2.7 A Police Department Employment program to include job training for individuals who want and are available to work, assistance with employment certifications, and experience to learn a skill/trade.

Public Works Apprentice program $223,170.00 Organizational Effectiveness, Partnership & Collaboration 2.7 A Public Works Apprentice program to include job training for individuals who want and are available to work, assistance with employment certifications, and experience to learn a skill/trade.

Youth Employment Program $148,750.00 Organizational Effectiveness, Partnership & Collaboration 2.7 The Student Worker Apprentice program will assist youth and designed to provide educational and career support to students belonging to racial/ethnic minorities or who have other challenges applying to or entering employment through a summer employment program and/or student apprenticeship program.

3. Services to Disproportionately Impacted Communities $5,714,545.04 18.19% City Net Homelessness Services $1,183,307.04 Quality of Life 3.11 Homelessness services - case management and emergency housing Pickleball Court $175,000.00 Quality of Life, Partnership & Collaboration 3.9 Construct a pickleball court at Gibbel Park to provide an aerobic exercise site for senior adults, while replacing an underutilized horseshoe play area. In a qualified census tract.

Outdoor Fitness Court - Gibbel Park $277,988.00 Quality of Life, Partnership & Collaboration 3.9 Construct a 2nd outdoor Fitness Court at Gibbel Park CityWide Park Improvements $1,728,250.00 Quality of Life, Partnership & Collaboration 3.9 Replace aging and deteriorating restrooms, playground equipment, shade structures and gazebos at four of the City’s major parks (Gibbel, Brubaker, Weston and Mary Henley) in order to ensure healthy and safe park facilities for the community.

Skate Park $1,950,000.00 Quality of Life, Partnership & Collaboration 3.9 Construct a Skate Park Plaza at Gibbel Park that will allow residents of all ages to have an all-wheel skate park location within the City. In a qualified census tract.

Children's Patio (Library) $50,000.00 Quality of Life, Partnership & Collaboration 3.9 Enhance the children’s patio on the east side of the library to include tables with benches, a drinking fountain, sunshades and play equipment. The Hemet Public Library is located centrally in Hemet. It is an economically challenged area with a housing stock that is generally 60 or more years old. This is a walkable area located near Police and Fire Stations. • Technology Upgrades to Streamline Operations Page 16 of 27

15.D

Page 912 of 2163 ends

City of Hemet Proposed ARPA SLFRF Projects
Category Recommendations Amount Percent Strategic Plan Alignment Exp Category Comments/Notes Refresh Library Firewall $350,000.00 Quality of Life, Partnership & Collaboration 3.9 Refresh for Library and adding the James Simpson Center Firewall. Our current firewall is 5 years old and due to nationwide ramson ware attacks needs to be replaced in order to provide proper security to Library Users. This project falls under section 5 of the APR Act, Infrastructure 5.17 other. The Hemet Public Library serves a population that is located in an economically disadvantaged area and having access to safe and protected Broadband connectivity is vital to the economic development in the Hemet community. This project allows the community to use the Library’s internet safely as they search for Homework Assistance, Jobs, Unemployment Benefits, Veterans assistance and medical help. This project allows interconnectivity with the Library and Simpson Center again allowing the public better internet access. Additionally, replacing out door cameras and DVR server for parking lot cameras. Access will be available using the enhanced wireless connectivity provided through this project, and will benefit the Simpson Center, Hemet Fire and Police Departments as well as the Library parking lots.

4. Premium Pay $972,500.00 3.10% Quality of Life 4.1
Premium pay for public sector staff who are eligible workers of the recipient who perform essential work during the COVID-19 health emergency

Page 17 of 27 ends

15.D

Page 913 of 2163 ends

City of Hemet Proposed ARPA SLFRF Projects
Category Recommendations Amount Percent Strategic Plan Alignment Exp Category Comments/Notes

5. Infrastructure $14,500,000.00 46.15%
Public Works Sewer Infrastructure projects $3,000,000.00 Quality of Life 5.1-5.5 Replace aging and failing sewer mainlines throughout the City. Certain areas of the city’s sewer infrastructure due to its age, construction defects and type of material used is in a state of disrepair and requires replacement to safeguard and protect public health and safety. These lines are experiencing major cracks, holes and collapse resulting in the potential for significant failures which in turn could result in Sanitary Sewer Overflows that could create health, safety and environmental concerns.

Replacing the sewer mains in failing areas will also protect the areas from ground water contamination. There are 11 sewer line sections mostly in the central part of the city that are top priority for replacement in which the lines are deteriorating.

Total footage in this project to be replaced is 5182 ft and 510 of relining with 40 linear feet of spot repairs.

Public Works Water Infrastructure Projects $3,500,000.00 Quality of Life 5.11-5.15 1) Construct a new two-million-gallon potable water storage reservoir and transmission line from Echo Hills tank site to distribution system.

Public Works Water Infrastructure Projects $4,500,000.00 Quality of Life 5.11-5.15 2) Replace aging transmission water line from Park Hill’s Tank site down to the city’s distribution system.

Public Works Water Infrastructure Projects $3,500,000.00 Quality of Life 5.11-5.15 3) Replace aging and failing water main drops that go under storm drain infrastructure in the residential neighborhoods of Sanderson to the west, Stetson to the South and Santa Teresa Way to the East.

6. Provisions of Government Services $0.00 0.00% N/A Must have calculated City revenue loss in order to use for provisions of general government.

7. Administrative $222,300.00 0.71%
• Administrative Costs for federal funding management and oversight $222,300.00 Organizational Effectiveness, Community Engagement 7.1 Grant management system, community engagement survey-Polco (3 year period - 2021/22-2023/24) Other Projects - Likely Ineligible - Does not meet Treasury Guidelines: $5,961,000.00 18.97% Community Development Neighborhood Enhancement Project $128,000.00 Organizational Effectiveness, Community Engagement The ARP program 1.5 Personal Protective Equipment will help our Neighborhood Enhancement Project (NEP) with Safe contact and Educational information to our communities. Code Enforcement staff will continue providing safe customer service to our communities and educational outreach. These protective gear items will allow staff to contact property owners and tenants that needing assistance in regards to health and safety conditions to their residence / homes and help create a safe environment and enhance quality of life.

City Clerk Records Management System $112,491.00 Organizational Effectiveness, Community Engagement City Leaders throughout the state are working hard every day to improve the quality of life for their communities. In 2020, many offices experienced a delay in regular business practices due to COVID-19 impacts. One significant impact to the City of Hemet due to COVID-19 was closing offices and limited service hours to the public. The significant risk for the City Clerk’s Office was providing accessibility to the City’s vital records on time. With the request for documents on the rise within the organization and the public, it is recommended to approve a new Record’s Management Plan, focusing on the archiving, preservation, and accessibility to documents. This new plan would focus on upgrading the City’s current LaserFiche system, allowing licenses for internal administrative use and a public portal, allowing accessibility to agreements, resolutions, ordinances, campaign disclosure documents, statements of economic interest, an assortment of maps, and other documents.

This plan will also include the preservation and archiving process for the City’s vital records such as minutes, ordinances, and resolutions.

Community Development Economic Development Strategic Plan $250,000.00 Organizational Effectiveness, Community Engagement The City is requesting funds to prepare an Economic Development Strategic Plan, including an analysis of the City’s per capita sales by market category and targeted industries for job growth. Identify underserved employment and retail categories and conduct a supply and demand analysis on the targeted niche. Provide a strategy to retain existing business and explore economic development opportunities to meet the city's needs for the future. Capitalize on economic development efforts already occurring in the region and form partnerships with adjacent cities, the County of Riverside, and other local organizations to enhance economic programs and funding opportunities.

Page 18 of 27 ends

15.D

Page 914 of 2163 ends

City of Hemet Proposed ARPA SLFRF Projects
Category Recommendations Amount Percent Strategic Plan Alignment Exp Category Comments/Notes Police Multi-purpose Mobile Command Post and Emergency Operations Center $1,200,000.00 Quality of Life, Organizational Effectiveness, Community Engagement The project description is a City-wide multi-purpose mobile Command Post (CP) and Emergency Operations Center (EOC). This is a modernized effort to establish infield CP or EOC with integrated infrastructure to resolve any issue across all City of Hemet Departments capabilities. This will be a mobile vehicle equipped with advance technology and communications capabilities support Community Events, Press Conferences, emergencies involving a centralized command post for all City Department over a long duration of time, to include Public Safety emergencies and to establish a much needed EOC. The mobile command vehicle will replicate and improve operations and capabilities by providing immediate set up in minimal amount of time throughout the City. It will provide the space to accommodate a large conference room for privacy, work stations, and command center to allow ease of work and planning while not interrupting the different operations. This will be a customized response vehicle which will include all necessary technology and equipment such as microwave, satellite and cellular video transmission, teleconferencing, high definition and thermal cameras, radio communications and dispatch. The vehicle will also be equipped with external work stations and monitors with separate access points to all areas of command. This will accommodate all stakeholders in the City at any time an incident or operation that has been activated.

Police External Safety and Infrastructure upgrade at the Main Public Safety Facilities $500,000.00 Quality of Life, Organizational Effectiveness, Community Engagement Rehab of the exterior areas of the Police Department and Fire Department facility to improve safety, to improve ingress and egress of public safety equipment to both facilities. This project would include an exterior block wall around the parking lot of both facilities to improve safety for all employees, redesign and refurbish of the parking lot for employee safety and equipment safety due to potholes and uneven pavement. New upgraded lighting to improve visibility at night due to both operations ongoing 24 hours a day 365 days a year. New upgraded entry end exit gates for ingress and egress of public safety equipment, responding and returning to the public safety facilities. The project would include architectural design and build to ensure improved functionality and safety.

Community Center & Citywide Training Facility $500,000.00 Quality of Life, Organizational Effectiveness, Community Engagement With the anticipated move of the Council Chambers to the Simpson Center I am recommending a remodel of the current location for a Community Center and Training Facility that would accommodate large groups for the purpose of meetings and educational training. This project would involve remodeling the current city council chambers, meeting rooms and Public Information room which all is in much need of infrastructure improvement. The project would include architectural design, project management, material, labor compliance and build, to ensure that the remodel will facilitate a community room for the public and training facility for city employees with the technology to accommodate meetings and training.

Fire Station Facility Evaluation/Retrofit/Remodel, Internal Fire Station System Upgrades $2,361,000.00 Quality of Life, Organizational Effectiveness, Community Engagement Comprehensive Fire Station Evaluation per Station; Diesel Smoke Extraction System per Station; Fire Station 5 modular replacement; Professional Washing machines
Fire Apparatus Replacement - 2 KME Engines $1,400,000.00 Quality of Life, Organizational Effectiveness, Community Engagement Two KME Fire Engines Amount of Total Projects $31,416,242.04 100%
City ARPA SLFRF Allocation $21,674,344.00
Variance (Remaining of Allocation) -$9,741,898.04

Page 19 of 27 ends

15.D

Page 915 of 2163 ends

City of Hemet Resolution No.

CITY OF HEMET

HEMET, CALIFORNIA
RESOLUTION NO. 2022-XXX

A RESOLUTION OF THE

CITY COUNCIL OF THE

CITY OF HEMET,

CALIFORNIA,

AUTHORIZING THE

ACCEPTANCE OF

CORONAVIRUS STATE

AND LOCAL FISCAL

RECOVERY FUNDS

ESTABLISHED BY THE

AMERICAN RESCUE
PLAN ACT OF 2021 IN

THE AMOUNT OF
$21,674,344, THE

EXECUTION OF ALL

NECESSARY PROGRAM

DOCUMENTS, AND THE

NECESSARY BUDGET

ADJUSTMENTS RELATED

THERETO
The City Council of the City of Hemet, California
(hereafter referred to as the “City Council”) does resolve as follows:

WHEREAS, on March 11, 2021, the American
Rescue Plan Act of 2021 was signed into law and
allocated Three Hundred and Fifty Billion Dollars
($350,000,000,000) of Coronavirus State & Local Fiscal
Recovery Funds (“SLFRF”) to state, local, territorial,

Page 20 of 27 ends

15.D

Page 916 of 2163 ends

City of Hemet Resolution No.
and tribal governments to bolster their response to the COVID-19 emergency and its economic impacts; and
WHEREAS, on May 10, 2021, the U.S.

Department of Treasury announced the launch of the
Coronavirus State and Local Fiscal Recovery Funds
program, and
WHEREAS, eligible categories of SLFRF
expenditures include response to the public health
emergency and its negative economic impacts,
provision of services to disproportionately impacted
communities, premium pay for essential workers,
necessary investments in water, sewer, and broadband
infrastructure, and replacement of lost public sector
revenue; and
WHEREAS, the City of Hemet (“City”) was
allocated Twenty-One Million Six Hundred SeventyFour Thousand Three Hundred and Forty-Four Dollars ($21,674,344) (“SLFRF Allocation”) and must comply
with SLFRF program requirements; and
WHEREAS, to receive these funds, the City
must submit a Financial Assistance Agreement; and
WHEREAS, the SLFRF Allocation must be
obligated by December 31, 2024, and expended by
December 31, 2026.

Page 21 of 27 ends

15.D

Page 917 of 2163 ends

City of Hemet Resolution No.

NOW, THEREFORE, THE CITY COUNCIL OF

THE CITY OF HEMET FINDS, DETERMINES,
ORDERS AND RESOLVES AS FOLLOWS:

SECTION 1. That the above recitations are
true.

SECTION 2. That the City Council authorizes
the acceptance of the ARPA SLFRF Allocation in the
amount of Twenty-One Million Six Hundred SeventyFour Thousand Three Hundred and Forty-Four Dollars ($21,674,344).

SECTION 3. That the City Council authorizes
the City Manager, or his designee, to execute any and
all documents necessary for the acceptance of the
SLFRF Allocation.

SECTION 4. That the City Council authorizes the
City Manager, or his designee, to effectuate any and all budget adjustments necessary to establish new project
numbers for tracking and spending the SLFRF
Allocation.

Page 22 of 27 ends

15.D

Page 918 of 2163 ends

City of Hemet Resolution No.

PASSED, APPROVED AND ADOPTED this 11th
day of January 2022.
____________________________
Malcom Lilienthal, Mayor
ATTEST:
_____________________________
John Paul Maier, City Clerk

Page 23 of 27 ends

15.D

Page 919 of 2163 ends

City of Hemet Resolution No.

State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of
Hemet, do hereby certify that the foregoing resolution
was adopted by the Hemet City Council on the 14 day
of December 2021, and was passed by the following
vote:

AYES: Council Members: None.

NOES: Council Members: None.

ABSTAIN: Council Members: None.

ABSENT: Council Members: None.
_____________________________
John Paul Maier, City Clerk

Page 24 of 27 ends

15.D

Page 920 of 2163 ends
Page 25 of 27 ends

15.D

Page 921 of 2163 ends

City of Hemet Proposed ARPA SLFRF Projects
Category Recommendations Amount
Meets
Council
Priorities
Strategic Plan
Alignment
Community
Input
Meets
Treasury
Guidelines

1. Supporting the Public Health Response $6,794,977.00
City-Wide General COVID Expenses and Response
• Replacement of Zoll Defibrillator/Heart Monitors $322,000.00 X X • On-going personal protective equipment (PPE) needs $22,000.00 X X • Investment in public facilities to meet pandemic operational needs - badge readers $165,000.00 X X
• Investment in public facilities to meet pandemic operational needs - Community Development Contactless Development Software $200,000.00 X X • Ventilation Improvements in Key locations (Library) $1,052,473.00 X X • Technology Upgrades to Streamline Operations - Criticial Infrastructure/Cybersecurity Modernization $1,000,000.00 X
X
• Technology Upgrades to Streamline Operations - Telephone and Network Modernization $1,000,000.00 XX • Technology Upgrades to Streamline Operations - Data Center Modernization $1,500,000.00 X X Small Business Infrastructure Grant (outdoor dining) $500,000.00 X X X X Community Violence Intervention Program $800,000.00 X X X Emergency Medical Response Costs - Fire and Police $233,504.00 X X

2. Negative Economic Impacts $3,211,920.00
Community Non-Profit Agency Grant Assistance $500,000.00 X X X X Utility Bill Relief Program $1,500,000.00 X X X X
Household Rent/Mortgage Assistance $500,000.00 X X X X
Police Department Job Training/Employment Support $340,000.00 X X X Public Works Apprentice program $223,170.00 X X X
Youth Employment Program $148,750.00 X X X

3. Services to Disproportionately Impacted Communities $5,714,545.04 City Net Homeless Services $1,183,307.04 X X X X
Pickleball Court $175,000.00 X X X
X
Outdoor Fitness Court - Gibbel Park $277,988.00 X X X
X
CityWide Park Improvements $1,728,250.00 X X X
X
Skate Park $1,950,000.00 X X X
X
Children's Patio (Library) $50,000.00 X X X X
Refresh Library Firewall $350,000.00 X X

4. Premium Pay $972,500.00 X X

5. Infrastructure $14,500,000.00
Public Works Sewer Infrastructure projects $3,000,000.00 X X X X
Public Works Water Infrastructure Projects - Water Storage reservoir (1) $3,500,000.00 X X X X Public Works Water Infrastructure Projects - Replace aging transmission water line from Park Hill’s Tank site (2) $4,500,000.00 X X X
X
Public Works Water Infrastructure Projects - Replace aging and failing water main drops that go under storm drain infrastructure (3) $3,500,000.00 X X X X

6. Provisions of Government Services $0.00 N/A

7. Administrative $222,300.00
• Administrative Costs for federal funding management and oversight $222,300.00 X X X X Other Projects - Likely Ineligible - Does not meet Treasury Guidelines: $6,451,491.00 Community Development Neighborhood Enhancement Project $128,000.00 X City Clerk Records Management System $112,491.00 X
Community Development Economic Development Strategic Plan $250,000.00 X Police Multi-purpose Mobile Command Post and Emergency Operations Center $1,200,000.00 X Police External Safety and Infrastructure upgrade at the Main Public Safety Facilities $500,000.00 X Community Center & Citywide Training Facility $500,000.00 X X Fire Station Facility Evaluation/Retrofit/Remodel, Internal Fire Station System Upgrades $2,361,000.00 X Fire Apparatus Replacement - 2 KME Engines $1,400,000.00 X Amount of Proposed Projects $31,416,242.04 $37,867,733.04 Amount of All Projects City ARPA SLFRF Allocation $21,674,344.00 $21,674,344.00 City ARPA SLFRF Allocation Variance -$9,741,898.04 -$16,193,389.04 Variance

Page 26 of 27 ends

15.D

Page 922 of 2163 ends
Page 27 of 27 ends

15.D

Page 923 of 2163 ends
Page 924 of 2163 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jan 25 2022
Department: City Attorney
Submitted by: Christopher Lopez, City Manager
Steven Graham, Interim City Attorney;
☐ Receive and File ☐ Consent Calendar ☒ Business Item ☐ Public Hearing TITLE:

Discussion and Direction Regarding Issuance of a City of Hemet Position Letter on Net Energy Metering

3.0 Proceedings Before the California Public Utilities Commission RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Discuss and take possible action, including potentially issuing a position letter on the Net Energy Metering 3.0 Proceedings being held before the California Public Utilities Commission.

BACKGROUND:

The California Public Utilities Commission is considering revisions to the net metering energy structure for solar electric customers. Several parties have submitted proposals for this new structure. Among the proposals is a joint submission from Pacific Gas and Electric, Southern California Edison, and San Diego Gas and Electric.

The draft position letter urges the California Public Utilities Commission to reject elements of proposals that would make it more difficult for customer-sited renewable generation installations to continue to grow.

ANALYSIS:

Net energy metering (NEM) was provided for by the California Legislature in Public Utilities Code section 2827 to support the installation of customer-sited renewable energy generation. Under NEM, when a rooftop solar system generates more energy than the homeowner or business actually consumes, customers can sell the excess back to utilities via the grid and receive credits on their bills.

In 2020, the California Public Utilities Commission (CPUC) initiated Rulemaking No. R.20-08 020 to revise the NEM structure in a third iteration known as ‘NEM 3.0’. Several parties have submitted

Page 1 of 4 ends

15.E

Page 925 of 2163 ends

proposals for what they contend the NEM 3.0 structure and terms should be. NEM 3.0 is the latest iteration of the program, which has not been updated since January 2016.

The focus of the NEM 3.0 proceeding is the balance between concepts known as payback periods and cost shifts. According to the CPUC, a ‘simple payback period’ is an estimate of how many years of bill savings would be required to recover the upfront costs of a new solar or solar-plus-storage system. A shorter payback period reflects a proposal that is more favorable to NEM participants. ‘Cost shift’ reflects the dollar value of utility costs shifted from participants to nonparticipants after interconnection. A smaller cost shift reflects a proposal that is more favorable to nonparticipants.

The NEM 3.0 proceeding has drawn significant attention from both trade organizations representing solar power manufacturers and installers on the one hand, and investor-owned utilities (such as Southern California Edison) on the other. The solar industry says the existing rules have been instrumental in making California the nation’s solar leader and warns major changes would jeopardize continued growth. Backers say rooftop installations help the state meet its greenhouse gas reduction goals and alleviate strain on the power grid.

Utilities have been calling for changes for years, saying the current policy leaves customers who don’t have rooftop solar paying a disproportionate amount of the fixed costs that come with running the electrical system — things like wires, substations, and transformers. The power companies say this “cost shift” needs to be addressed and others have cited equity issues for customers who can’t afford to install rooftop solar having to pay a disproportionate share of costs.

On December 13, 2021, the CPUC announced a proposed decision from the CPUC's Administrative Law Judge. The proposal can be accepted, rejected or altered by the CPUC’s five commissioners. The important highlights from the proposed decision are as follows:

Changing how much solar customers are paid when they send power back to the grid. Instead of receiving the retail rate of electricity, they would get paid at the “actual avoided cost,” which is lower.

Creating a “grid participation charge” of $8 per kilowatt on the solar systems of residential customers.

The typical rooftop system is about 5 to 6 kilowatts so the charge would come to about $40 to $48 per month for most customers. According to the CPUC, the average customer who does not have rooftop solar pays about $100 per month for their access to the grid. The charge would not apply to commercial customers.

Establishing a $600 million Equity Fund to support clean energy and energy storage programs for lowincome Californians. Disadvantaged households would be exempt from paying the grid participation charge.

Providing a 10-year payback period for customers who add energy storage to their solar systems. The goal is that by deploying storage, customers will help reduce strain on the grid during the 6 p.m. to 9 p.m. hours when solar production rapidly deceases as the sun sets.

DISCUSSION:

Many communities are sending comment letters to the CPUC and it is reported that the CPUC has received over 100,000 comments so far. City staff have prepared draft language for a comment letter below for City Council consideration:

Page 2 of 4 ends

15.E

Page 926 of 2163 ends

**** DRAFT POSITION LETTER LANGUAGE ****
NEM is a significant driver of solar adoption in the City of Hemet. The California Public Utilities Commission (CPUC) has commenced Rulemaking No. R.20-08 020 to revise the NEM tariff structure in a third evolution known as NEM 3.0 and a proposed decision has been submitted for consideration as early as January 27, 2022 by the CPUC. Public Utilities Code section 2827.1 requires that the NEM

3.0 successor tariff to “[e]nsure that customer-sited renewable distributed generation continues to grow sustainably and include specific alternatives designed for growth among residential customers in disadvantaged communities,” and “[e]nsure that the total benefits of the [NEM 3.0] tariff to all customers and the electrical system are approximately equal to the total costs” The proposed NEM decision would extend the payback period for customer-sited solar systems significantly beyond the payback periods. Additionally, the proposal does not sufficiently reduce costshifting and ensure that total benefits to all customers are approximately equal to total costs. In particular, the new fixed fees on NEM 3.0 customers called Grid Benefits Charge would make it more difficult for customer-sited renewables to continue to grow sustainably as mandated by Public Utilities Code section 2827.1.

The clean energy sector has a large economic benefit for our region, and the rooftop solar industry provides thousands of jobs in Riverside County. Expanding access to rooftop solar in our community will help California move toward clean energy and energy independence.

The Hemet City Council, therefore, supports significant changes to the proposed NEM 3.0 decision that:
• Support the sustainable growth of customer-sited solar electric and energy storage facilities to meet California’s clean energy targets, particularly residential customers in disadvantaged communities.
• Expand access to renewable solar generating facilities for low-and-moderate income households including access to other clean energy technologies such as batteries and ensure that the solar installations continue to grow.
• Ensure equitable and robust solar rooftop and battery adoption and do not burden non-solar and low-income customers.
• Reject elements of the proposal that will stifle sustainable growth of customer-sited renewable generating facilities including high monthly fixed charges and avoided cost models PREVIOUS COUNCIL ACTION:

None
STRATEGIC PLAN INTEGRATION:

N/A
FISCAL IMPACT:

N/A
ALTERNATIVE(S):

Page 3 of 4 ends

15.E

Page 927 of 2163 ends

The City Council could direct staff to amend the proposed position letter language or decline to issue a position letter.

Page 4 of 4 ends

15.E

Page 928 of 2163 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jan 25 2022
Department: Public Works
Submitted by: Christopher Lopez, City Manager
Lynn Merrill, Public Works Consultant;
☐ Receive and File ☐ Consent Calendar ☒ Business Item ☐ Public Hearing TITLE:

Centrica Business Solutions - Investment Grade Audit of City Facilities Results Update RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Receive an update and report of the proposed recommendations provided by Centrica Business Solutions regarding the Investment Grade Audit of the City's facilities, provide guidance to staff regarding the next steps relating to the selection, implementation, and financing of the audit recommendations, and remove this item from the Council's List of Future Items.

BACKGROUND:

In July 2019, Centrica Business Solutions Services, Inc., (Centrica) approached the City regarding the performance of a Preliminary Feasibility Assessment of City buildings and facilities in order to identify potential opportunities for the City to improve and enhance the energy demands and usages within the various city facilities such as City Hall, Covell Building, Police, Fire and Public Library. Centrica conducted this Preliminary Feasibility Assessment in June 2020 and identified eleven Facility Improvement Measures (FIM) in which tentative energy savings may be implemented. These areas include:

Facility Improvement Measure (FIM)
Interior LED Lighting
Exterior LED Lighting
HVAC Replacements
Hot Water Pump Variable Frequency Drive
Chiller Replacement
Demand Control Ventilation
Networkable Thermostats
Transformer Replacement

Page 1 of 1157 ends

15.F

Page 929 of 2163 ends

Facility Improvement Measure (FIM)
Generator Block Heater Heat Pump
Plug-Load Controls
Solar Photovoltaic
At the December 8, 2020, Regular City Council Meeting, Centrica presented the results of the Preliminary Feasibility Assessment. The Assessment identified various opportunities for the City to achieve significant energy saving, and it was recommended that an Investment Grade Audit of all City buildings and facilities be conducted. This Audit was conducted at no cost to the City.

As a result, the City Council approved an Investment Grade Audit Agreement between the City and Centrica on December 8, 2020. Centrica commenced the work on the Investment Grade Audit in January 2021 and submitted a draft report on August 3, 2021. Staff and Centrica conducted subsequent internal reviews of the Audit, including review meetings with the various effected departments such as Police and Fire to confirm the acceptance of the recommendations within the Audit. In addition, staff and Centrica worked closely together regarding potential alternative funding sources for the proposed Audit results in order to reduce the long-term funding requirements to the City.

ANALYSIS:

The purpose of the Investment Grade Audit (IGA) was to conduct a more detailed review of all of the City’s facilities in order to fully identify and quantify the extent of the potential savings that may be afforded to the City through the implementation of a comprehensive energy program and facilities upgrade.

This work could, if the City elects to implement the results of the Investment Grade Audit, result in a budget-neutral energy savings project under California State Government Code 4217.10 et seq (“4217 Code”). Under State Government Code 4217 et. seq. the City may enter into a direct agreement with a company to conduct the necessary studies and implement a program of energy-saving retrofits that will result in net energy savings over a 25-year period and that does not increase the foreseeable City’s energy costs. This program allows the City to reduce energy demand by replacing outdated and inefficient lights, heating and air conditioning systems and implementing long term conversion to solar photovoltaic systems, thus reducing the City’s energy demands on the state’s limited energy grid, as well as reducing the City’s Green House Gas footprint in compliance with various state laws, policies, and objectives.

As a result of the Audit, Centrica reviewed various internal City documents prepared by the various departments that relate to energy conservation and facility upgrades. This included such issues as inadequate HVAC systems, single-pane windows, poor ventilation, and other building envelope components. Centrica conducted detailed assessments of each City building, including a physical inventory of the energy use components, reviews of utility bills for each facility, and discussions with affected departments as to energy-related issues such as inadequate or poor heating, ventilation, and air conditioning or substandard lighting.

As a result of the Audit, Centrica identified three key areas for consideration. These are summarized below:

Infrastructure Enhancements: includes interior and exterior lighting improvements, advanced lighting controls, HVAC unit replacements, chilled water system upgrades, hot water system upgrades, building

Page 2 of 1157 ends

15.F

Page 930 of 2163 ends

management system upgrades, secondary transformer replacements, networkable thermostats, plug load controls, window retrofits, and domestic plumbing retrofits and replacements.

Renewable Energy: includes solar photovoltaics and microgrids including battery storage systems to ensure continuity of power services in the event of extended electrical service interruptions.

Irrigation Conservation: includes various water conservation features within landscape areas throughout the City.

The following table summarizes the program recommendations by each operation:

Department Implementation Cost
Percent of Total
Project
Implementation Cost
First Year Utility
and Maintenance
Savings
Fire (Stations 1, 2,
and 4) $580,239 6.4% $19,885
Police $698,411 7.7% $25,321
Public Safety
Resiliency $3,222,844. 35.4% $165,192
General Facilities $2,883,553 31.7% $181,624
Parks $684,061 7.5% $17,642
Landscape
Maintenance
Districts
$1,026,848 11.3% $98,557
TOTALS $9,095,956 $508,221
Of the recommended work, the largest cost items include the installation of solar photovoltaics at Fire Station 4 and the City Yard and the Public Safety Resiliency that includes both a photovoltaic array and battery back-up/microgrid system. The attached PowerPoint presentation provides additional details as it relates to specific recommendations as contained in the full audit report.

DISCUSSION:

Due to the level of deferred maintenance that has accumulated within the City's facilities, this program represents an important opportunity for the City to make a significant impact on the physical condition of the facilities as well as reduce energy costs while lowering greenhouse gas emissions. Under the general authority of the State of California 4217 Code Program, energy conservation efforts that reduce demand have been exempted from the normal process of development of bid specifications and engineering plans, and may directly be implemented. As shown in the previous section, the proposed program would result in approximately $500,000 per year of energy and maintenance savings.

Under the 4217 Code Program, these savings would then be used to fund the actual improvements on a long-term financing program. The approximate total of $9,096,000 of identified improvements could be financed through an appropriate financial instrument as provided by Centrica and financial partners for up to 18 years while generating actual net savings to City operations. Staff spent considerable discussion with Centrica, Finance, and the City Manager's Office on alternative financing, which could include use of General Fund fund balance for public safety enhancements, water conservation funding through both the City's Water Division and Eastern Municipal Water District / Metropolitan Water District, American Rescue Plan (ARP) or internal fund balances as identified.

Page 3 of 1157 ends

15.F

Page 931 of 2163 ends

Staff is therefore seeking direction from the City Council relating to project implementation, including direction as to desired financial methods.

A proposed funding approach that may be considered, would include a mix of ARPA, General Fund fund balance, long term bond financing and water conservation grants from both the City of Hemet Water Division and Eastern Municipal Water District. The table below shows a broad allocation of the specific energy saving categories and potential funding sources:

This approach would minimalize the long-term financing of the various solar projects to approximately $3,909,743 while ensuring the maximum amount of annual energy savings accrued to the City by the use of one-time payments. The remaining $1,576,552 of projects could potentially be funding through other sources, or included in the bond financing amount, increase the total amount of long-term bond financing to $5,486,295.

If the Council accepts the findings of the Investment Grade Audit and provides guidance to staff regarding an acceptable funding strategy, staff will subsequently develop a financing plan for presentation to the Council at the January 25th Council meeting. A public hearing may be required to formally adopt the financing plan under the 4217 Code Program requirements and authorize staff to implement the Audit recommendations and to enter into an implementation agreement with Centrica.

PREVIOUS COUNCIL ACTION:

December 8, 2020 - Authorize Centrica to conduct an Investment Grade Audit.

STRATEGIC PLAN INTEGRATION:

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Page 4 of 1157 ends

15.F

Page 932 of 2163 ends

The proposed action aligns with Council adopted objective: Operate in a financially sustainable manner.

This program meets the Strategic Plan objectives by reducing the City's use of electricity, water, and gas in city facilities while allowing the City to enhance and improve the environmental quality of the valley through good stewardship of limited resources.

FISCAL IMPACT:

Under the proposed Investment Grade Audit, financing for the entire approximate total of $9,096,000 would be from the net energy savings resulting from the program. This funding stream would be subject to ongoing measurement and verification of ongoing savings to confirm actual savings.

Alternative funding of the program may be developed using various grants and revenue sources, to reduce the length of the financing terms and to pay for less expensive elements of the program. Such funding sources may include fund balance, water conservation funding through both the City's Water Division and Eastern Municipal Water District, American Rescue Plan funding or other grants.

ALTERNATIVE(S):

Accept the findings of the Audit, and take no further action, or provide additional direction as appropriate.

ATTACHMENT(S):

Attachment 1: City of Hemet IGA Report 11.24 (1)
Attachment 2: Appendix A
Attachment 3: Appendix B
Attachment 4: Appendix C part1
Attachment 5: Appendix C part2
Attachment 6: Appendix C part3
Attachment 7: Appendix D

Page 5 of 1157 ends

15.F

Page 933 of 2163 ends

© 2021 Centrica Business Solutions
Josh Steeber
Account Executive
949.432.0689
[email protected]
Trevor Nelson, P.E., LEED AP, CEM, CCP
Engineering & Development Leader
949.878.7271
[email protected]
Brett Watson
Project Director
805.704.6166
[email protected]
Teren Salinas
Energy Engineer
714.400.4961
[email protected]
Investment
Grade
Audit
City of Hemet

Page 6 of 1157 ends

15.F

Page 934 of 2163 ends

© 2020 Centrica Business Solutions

Page 2 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table of Contents

1.0 Executive Summary ................................................................................................................. 1

1.1 Project Overview.............................................................................................................................. 1

1.2 Facility Improvement Measure (FIM) Summary .............................................................................. 2

1.2.B PARKS.......................................................................................................................................................7

1.2.C FIRE DEPARTMENT...................................................................................................................................8

1.2.D POLICE DEPARTMENT ..............................................................................................................................9

1.2.C/D FIRE/POLICE DEPARTMENT SOLAR - RESILIENCY...............................................................................10

1.2.E LANDSCAPE MAINTENANCE DISTRICTS .................................................................................................11

1.2.G BASINS ...................................................................................................................................................12

1.3 Integration with Strategic Plan ...................................................................................................... 13

1.4 Project Guidelines and Goals......................................................................................................... 15

2.0 Facility Description ................................................................................................................ 16

3.0 Utility Analysis....................................................................................................................... 19

3.1 Utility Usage and Cost Summary.................................................................................................... 19

3.2 Utility Rate Review......................................................................................................................... 21

3.3 Baseline Annual Energy Usage and Utility Benchmarking ............................................................. 28

3.4 Reconciliation of Usage to Baseline............................................................................................... 35

4.0 Facility Improvements........................................................................................................... 36

4.1 FIM #1 Interior LED Lighting Upgrades.......................................................................................... 36

4.2 FIM #2: Exterior LED Lighting Upgrades ........................................................................................ 49

4.3 FIM #3: Advanced Lighting Controls.............................................................................................. 59

4.4 FIM #4: HVAC Unit Replacements ................................................................................................. 60

4.5 FIM #5: Chilled Water System Upgrades....................................................................................... 67

4.6 FIM #6: Hot Water System upgrades............................................................................................. 70

4.7 FIM #7: Building Management System REplacement.................................................................... 73

4.8 FIM #8: Secondary Transformer Installation ................................................................................. 79

4.9 FIM #9: Networkable Thermostat Installation............................................................................... 82

4.10 FIM #10: Plug load controls ........................................................................................................... 88

4.11 FIM #11: Solar Photovoltaics ......................................................................................................... 92

4.12 FIM #12: Window Retrofits............................................................................................................ 96

4.13 FIM #13: Domestic Plumbing Fixture Upgrades .......................................................................... 103

4.14 FIM #14: Irrigation Controls Upgrades ........................................................................................ 151

5.0 Financial Summary .............................................................................................................. 165

6.0 Potential Rebates and Incentives......................................................................................... 168

7.0 Project Construction Schedule ............................................................................................. 169

Page 7 of 1157 ends

15.F

Page 935 of 2163 ends

© 2020 Centrica Business Solutions

Page 1 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.0 Executive Summary

1.1 PROJECT OVERVIEW
Centrica Business Solutions Services (Centrica) is pleased to provide this Investment Grade Audit (IGA) for the City of Hemet. We developed the following report to identify, document, and present a full complement of infrastructure improvements and cost reduction strategies.

We greatly value the support we have received from the public works department and city staff and look forward to expanding our partnership by implementing these Facility Improvement Measures (FIMs) during the design-build implementation phase of the project.

Centrica will complete the scope of work as described in this proposal for an installed cost of $9,096,095.

This report provides the scope of work, energy savings estimates, and cost proposal for infrastructure improvement and cost reduction strategies at the following City buildings, parks, and districts:

Facilities
• City Hall
• City Yard
• City Storage
• Public Library
• Simpson Center
Parks
• Brubaker Park
• Cawston Park
• Gibbel Park
• Simpson Park
• Spencer Park
• Weston Park
Fire Department
• Fire Station 1
• Fire Station 2
• Fire Station 4
Police Department
• Gang Task Force
• PACT
• Police Station
• Shooting Range
• SWAT Command/
GIT
Landscape Maintenance
Districts
• Heartland District
(19-5)
• Woodcrest District
(23-2B)
• Cottonwood District
(22)
• McSweeney District
(36)
• AP North Lakes Solar
(101)
• Autumn Ridge
District (23-4)
• Crean District (23)
• Rancho Diamonte
District (47)
• Stoney Mountain
District (19-4)
• Original District (13)
• Original District (16)
• Original District (17)
• Original District (19)
• Willowalk District
(26)
• Flowerwood District
(25)
Basins
• Mary Henley Park

Page 8 of 1157 ends

15.F

Page 936 of 2163 ends

© 2020 Centrica Business Solutions

Page 2 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.2 FACILITY IMPROVEMENT MEASURE (FIM) SUMMARY
The Facility Improvement Measures (FIMs) presented in this report will result in a total annual energy cost savings of $393,920/year, which translates to a 33% reduction in annual utility costs for the sites specified in the scope of work. In addition, annual maintenance, repair, and replacement savings of $16,814 per year are identified. Thus, the total annual project savings are $410,734/year.

Tables 1, 2, and 3 provides energy savings, maintenance savings, and implementation price, for all recommended FIMs for all city owned properties. FIMs will provide City of Hemet the ability to accomplish the following:
• Reduce annual electricity consumption by 30%
• Reduce annual natural gas consumption by 9%
• Reduce annual water consumption by 4%
Table 1: Summary of Recommended Infrastructure Enhancements Infrastructure Enhancements
FIM
No. FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Annualized
Rate of
Return
Install Cost
1 Interior Lighting Improvements $59,579 $5,692 5% $739,373 2 Exterior Lighting Improvements $22,442 $2,284 6% $231,991 3 Advanced Lighting Controls $0 $0 0% $43,125
4 HVAC Unit Replacements $4,839 $8,449 0% $800,213
5 Chilled Water System Upgrades $14,075 $0 1% $445,902
6 Hot Water System Upgrades $1,105 $0 0% $268,132
7 Building Management System
Upgrades $13,420 $0 2% $338,489
8 Secondary Transformer
Replacements $10,222 $0 4% $137,468
9 Networkable Thermostats $4,572 $0 0% $241,007
10 Plug Load Controls $2,343 $0 10% $9,226
12 Window Retrofits $2,690 $0 0% $290,692
13 Domestic Plumbing
Retrofits/Replacements $3,852 $389 0% $159,570
TOTALS $139,140 $16,814 2% $3,705,188

Page 9 of 1157 ends

15.F

Page 937 of 2163 ends

© 2020 Centrica Business Solutions

Page 3 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table 2: Summary of Renewable Energy
Renewable Energy
FIM
No. FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Annualized
Rate of
Return
Install Cost
11 Solar Photovoltaics and Microgrid $144,596 $0 2% $3,909,743 TOTALS $144,596 $0 2% $3,909,743
Table 3: Summary of Irrigation Conservation
Irrigation Conservation
FIM
No. FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Annualized
Rate of
Return
Install Cost
14 Irrigation System Upgrades $110,184 $0 4% $1,481,163 TOTALS $110,184 $0 4% $1,481,163

Page 10 of 1157 ends

15.F

Page 938 of 2163 ends

© 2020 Centrica Business Solutions

Page 4 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Improvement Measure (FIM) Summary by Department Sections 1.2.A through 1.2.F separate the overall project by departments affetced by the recommended facility improvement measures. Tables 2 through 10 provides energy savings, maintenance savings, and implementation costs for each department. Sections below are catorgoized by the following:
• 1.2.A FACILITIES
• 1.2.B PARKS
• 1.2.C FIRE DEPARTMENT
• 1.2.D POLICE DEPARTMENT
• 1.2.C/D FIRE/POLICE DEPARTMENT SOLAR
• 1.2.E LANDSCAPE MAINTENANCE DISTRICTS
• 1.2.F BASINS

Page 11 of 1157 ends

15.F

Page 939 of 2163 ends

© 2020 Centrica Business Solutions

Page 5 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.2.A FACILITIES
FIMs listed in Tables 4 through 6 are applicable to the following sites:
• City Hall
• City Yard
• City Storage
• Public Library
• Simpson Center
Table 4: Summary of Facilities Recommended FIMs- Infrastructure Enhancements Infrastructure Enhancements
FIM
No. FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Annualized
Rate of
Return
Install Cost
1 Interior Lighting Improvements $40,716 $4,255 6% $429,199 2 Exterior Lighting Improvements $8,813 $911 7% $81,938 3 Advanced Lighting Controls $0 $0 0% $43,125
4 HVAC Unit Replacements $2,429 $3,788 0% $311,915
5 Chilled Water System Upgrades $14,075 $0 1% $445,902
6 Hot Water System Upgrades $1,105 $0 0% $268,132
7 Building Management System
Upgrades $13,420 $0 2% $338,489
8 Secondary Transformer
Replacements $7,704 $0 5% $81,908
9 Networkable Thermostats $287 $0 0% $113,913
10 Plug Load Controls $1,572 $0 10% $6,300
12 Window Retrofits $1,396 $0 0% $141,308
13 Domestic Plumbing
Retrofits/Replacements $1,425 $259 0% $108,534
TOTALS $92,942 $9,213 2% $2,370,662

Page 12 of 1157 ends

15.F

Page 940 of 2163 ends

© 2020 Centrica Business Solutions

Page 6 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table 5: Summary of Facilities Recommended FIMs- Renewable Energy Renewable Energy
FIM
No. FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Annualized
Rate of
Return
Install
Cost
11 Solar Photovoltaics $70,003 $0 8% $441,286
TOTALS $70,003 $0 8% $441,286
Table 6: Summary of Facilities Recommended FIMs- Irrigation Conservation Irrigation Conservation
FIM
No. FIM Name
Annual
Utility
Savings
Annual Repair
and
Replacement
Savings
25 Year
Annualized
Rate of
Return
Install
Cost
14 Irrigation System Upgrades $9,464 $0 7% $71,605
TOTALS $9,464 $0 7% $71,605

Page 13 of 1157 ends

15.F

Page 941 of 2163 ends

© 2020 Centrica Business Solutions

Page 7 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.2.B PARKS
FIMs listed in Table 7 are applicable to the following sites:
• Brubaker Park
• Cawston Park
• Gibbel Park
• Simpson Park
• Spencer Park
• Weston Park
Table 7: Summary of Parks Recommended FIMs
Infrastructure Enhancements
FIM
No. FIM Name
First Year
Utility
Savings
First Year
Repair and
Replacement
Savings
25 Year
Return on
Investment
Install
Cost
1 Interior Lighting Improvements $3,248 $156 3% $74,301 2 Exterior Lighting Improvements ($18) $99 0% $14,115
4 HVAC Unit Replacements $180 $754 0% $97,615
8 Secondary Transformer
Replacements $1,005 $0 5% $12,393
13 Domestic Plumbing
Retrofits/Replacements $64 $0 6% $551
TOTALS $4,479 $1,009 1% $198,975
Irrigation Conservation
FIM
No. FIM Name
Annual
Utility
Savings
Annual Repair
and
Replacement
Savings
25 Year
Return on
Investment
Install
Cost
14 Irrigation System Upgrades $12,154 $0 0% $485,086
TOTALS $12,154 $0 0% $485,086

Page 14 of 1157 ends

15.F

Page 942 of 2163 ends

© 2020 Centrica Business Solutions

Page 8 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.2.C FIRE DEPARTMENT
FIMs listed in Tables 8 and 9 are applicable to the following sites:
• Fire Station 1
• Fire Station 2
• Fire Station 4
Table 8: Summary of Fire Department Recommended Infrastructure Enhancements Infrastructure Enhancements
FIM
No. FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Return on
Investment
Install
Cost
1 Interior Lighting Improvements $4,986 $585 4% $80,485 2 Exterior Lighting Improvements $1,714 $213 7% $14,473 4 HVAC Unit Replacements $1,041 $1,670 0% $175,199
9 Networkable Thermostats $1,593 $0 3% $32,274
12 Window Retrofits $271 $0 0% $32,196
TOTALS $9,605 $2,469 2% $334,627
Table 9: Summary of Fire Department Renewable Energy
Renewable Energy
FIM
No. FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Return on
Investment
Install
Cost
11 Solar Photovoltaics – Fire Station
#4 $6,899 0% 2% $245,612
TOTALS $6,899 0% 2% $245,612

Page 15 of 1157 ends

15.F

Page 943 of 2163 ends

© 2020 Centrica Business Solutions

Page 9 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.2.D POLICE DEPARTMENT
FIMs listed in Table 10 are applicable to the following sites:
• Gang Task Force
• PACT
• Police Station
• Shooting Range
• SWAT Command/ GIT
Table 10: Summary of Police Department Recommended FIMs FIM
No.

FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Return on
Investment
Install
Cost
1 Interior Lighting Improvements $10,629 $696 5% $155,388 2 Exterior Lighting Improvements $2,714 $291 8% $19,089 4 HVAC Unit Replacements $1,189 $2,237 0% $215,485
8 Secondary Transformer
Replacements $1,512 $0 1% $43,167
9 Networkable Thermostats $2,692 $0 0% $94,820
10 Plug Load Controls $771 $0 10% $2,925
11 Solar Photovoltaics $0* $0* 0% $0*
12 Window Retrofits $1,023 $0 0% $117,189
13 Domestic Plumbing
Retrofits/Replacements $2,350 $130 3% $50,348
TOTALS $22,881 $3,353 2% $698,411
*Solar Photovoltaics for Police Station are applied in Section 1.2C/D, Table 11

Page 16 of 1157 ends

15.F

Page 944 of 2163 ends

© 2020 Centrica Business Solutions

Page 10 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.2.C/D FIRE/POLICE DEPARTMENT SOLAR - RESILIENCY
Fire Station 1 and Police Station share a common main electrical panel from the utility provider. Both fire and police departments benefit from solar array and microgrid respective of their total building usage.

Due to both building usage being attached to one (1) meter, Section 1.2.C and 1.2.D do not include solar cost savings and implementation cost. The following section with Tables 11 describes the overall solar array and microgrid that will affect Fire Station 1 and Police Station.

Table 11: Summary of Solar Photovoltaics at Fire Station 1/Police Station FIM
No.

FIM Name
Annual
Utility
Savings
Annual
Repair and
Replacement
Savings
25 Year
Return on
Investment
Install Cost
11 Solar Photovoltaics $55,273 $0 0% $2,380,495
11 Microgrid $12,421 $0 0% $842,350
TOTALS $67,694 $0 0% $3,222,845

Page 17 of 1157 ends

15.F

Page 945 of 2163 ends

© 2020 Centrica Business Solutions

Page 11 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.2.E LANDSCAPE MAINTENANCE DISTRICTS
FIMs listed in Table 12 are applicable to the following sites:
• Heartland District (19-5)
• Woodcrest District (23-2B)
• Cottonwood District (22)
• McSweeney District (36)
• AP North Lakes Solar (101)
• Autumn Ridge District (23-4)
• Crean District (23)
• Rancho Diamonte District (47)
• Stoney Mountain District (19-4)
• Original District (13)
• Original District (16)
• Original District (17)
• Original District (19)
• Willowalk District (26)
• Flowerwood District (25)
Table 12: Summary of LMD Recommended FIMs
FIM
No.

FIM Name
Annual
Utility
Savings
Annual Repair
and
Replacement
Savings
25 Year
Return on
Investment
Install
Cost
2 Exterior Lighting Improvements $8,980 $753 6% $92,542 14 Irrigation System Upgrades $51,947 $0 4% $824,799
TOTALS $60,927 $753 4% $917,341

Page 18 of 1157 ends

15.F

Page 946 of 2163 ends

© 2020 Centrica Business Solutions

Page 12 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.2.F BASINS
FIMs listed in Table 13 are applicable to the following sites:
• Mary Henley Park
Table 13: Summary of Basin Recommended FIMs
FIM
No.

FIM Name
Annual
Utility
Savings
Annual Repair
and
Replacement
Savings
25 Year
Return on
Investment
Install
Cost
2 Exterior Lighting Improvements $240 $17 0% $9,833
14 Irrigation System Upgrades $36,620 $0 11% $99,674
TOTALS $36,860 $17 11% $109,507

Page 19 of 1157 ends

15.F

Page 947 of 2163 ends

© 2020 Centrica Business Solutions

Page 13 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.3 INTEGRATION WITH STRATEGIC PLAN
City of Hemet Mayor, with assistance from City Manager and City Council, has developed a strategic plan for fiscal year 2021/22 and beyond. Outlined in the plan is the vision for City of Hemet, along with concrete action items and success metrics. The Strategic Plan organizes focus into the following categories:
• Improve quality of life
• Promote economic opportunity
• Increase community engagement
• Increase partnering and collaboration
• Improve organizational effectiveness
It is Centrica’s intent to fit within the Strategic Plan and assist with meeting specific goals and metrics.

IMPROVE QUALITY OF LIFE
In an effort to improve quality of life for Hemet residents, the Strategic Plan dictates enhancing the visual appearance of the community and increasing public safety. Further, a success indicator is described as the total park maintenance expenditures per acre. Centrica’s proposed project shall assist in the following ways:
• Installing new exterior lighting fixtures in parks, buildings, parking lots, and streetsides. The new fixtures shall have a modern look, increasing the aesthetics of the lighting. Further, the new lighting shall provide a consistent color temperature and more visual pleasing lighting pattern. • Increase light levels in the park shall assist in making the parks more safe. • The solar arrays to be installed in the parking lots of Police and Library shall provide an update to the aesthetics of the area.
• The solar arrays at Police and Library shall be paired with battery energy storage and a microgrid controller. This shall provide energy resiliency to Police Station as additional backup power in the event of electric service issues.
• Updated irrigation controllers in parks shall reduce maintenance and increase the health of existing turf.
• LED lighting at parks shall reduce the maintenance burden because LEDs last 3-4 time longer than the existing lighting technology.

Success will be measured in following ways:
• Light levels at Parks shall be measured before and after installation. Success will be indicated by an increase in light levels.
• Police station resiliancy will create a safer environment for city residents by enabling police to remain operational during power failure. Success will be indicated by decreased operation of existing generator. An ancillary measure of success shall be indicated should electric grid failure occurs and Police operations are not interupted.

Page 20 of 1157 ends

15.F

Page 948 of 2163 ends

© 2020 Centrica Business Solutions

Page 14 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

INCREASE COMMUNITY ENGAGEMENT
The Strategic Plan details the goals of increasing transparency for the public, increasing community’s pride within the City, and delivering messaging to the Community that connects. A success indicator for these goals is stated as “percent increase of social media followers.” Centrica’s proposed project shall assist in the following ways:
• Work with city staff to create a public relations release on social media networks detailing the project.
• Work with City IT staff to create a live graphic for the City’s website to show the benefits of the solar arrays at Police Station and City Yard. The graphic shall show the total energy production of the solar arrays, as well as the amount of carbon dioxide emissions offset and its equivalency in environmental benefits.
• Centrica shall conduct free community workshops with City council to educate residents on home and commercial energy savings, water efficiency, and renewable technologies.

Success will be measured in following ways:
• Increased traffic to City website and social media pages • Community Workshop attendance

IMPROVE ORGANIZATIONAL EFFECTIVENESS
In order to improve organizational effectiveness, the Strategic Plan specifies operating in a financially sustainable manner, ensuring continuity with industry best practices, and increasing employee retention through training. It further emphasizes the need to create a public works maintenance schedule in line with existing staffing. Centrica shall assist with these goals in the following ways:
• Reduce maintenance through replacement of end of life HVAC equipment • Reduce repair and replacement costs through the installation of long-life LED lighting • Train Public Works staff in the proper operation and maintenance of new equipment • Provide Public Works with maintenance schedule for new equipment, in line with industry standards
• Control utility costs by reducing existing energy and water costs, and by producing electricity onsite via solar arrays.

Success will be measured in following ways:
• Number of HVAC units replaced under emergency conditions shall be reduced • Reduction in maintenance budget for lighting replacements • Adherence of Public Works to preventative maintenace schedule • Reduction in electric, natural gas, and water costs

Page 21 of 1157 ends

15.F

Page 949 of 2163 ends

© 2020 Centrica Business Solutions

Page 15 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

1.4 PROJECT GUIDELINES AND GOALS
Centrica has worked with the following objectives in mind for City of Hemet:
• Promote City’s strategic plan.
• Reduce energy and water costs for buildings and parks. • Maintain or improve existing conditions within each facility. • Provide and improve operational control of City of Hemet facility equipment and systems. • Reduce maintenance burden for Public Works staff.

Additional benefits include:
• Work performed under a normal, properly planned and executed schedule and not under an emergency situation.
• Provides quality engineering, construction and long-term performance under a turnkey approach.

Page 22 of 1157 ends

15.F

Page 950 of 2163 ends

© 2020 Centrica Business Solutions

Page 16 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November24, 2021

2.0Facility Description
Centrica Engineers audited a series of buildings, and parks within City of Hemet jurisdiction, as summarized in Table 9 through14. The total gross area of the buildings audited is 245,755.

Table 11– Facilities Properties Considered
Building Address Facility Type Square ft. Utility Spend Electrical Provider Gas Provider Water Provider City Hall 445 E Florida Ave Office 26,455 $60,262 Southern California Edison SoCal Gas City of Hemet City Yard 3777 Industrial
Ave
Office/ Warehouse/
Storage 46,280 $84,260 Southern California Edison SoCal Gas EMWD Library 300 E Latham Ave Library/ Public
Assembly 50,650 $113,017 Southern California Edison SoCal Gas City of Hemet Simpson Center 305 E Devonshire
Ave, Hemet, CA Community Center 22,040 $22,853 Southern California Edison SoCal Gas City of Hemet City Storage 124 N Carmalita St Unoccupied N/A $362 Southern California Edison SoCal Gas City of Hemet Table 12– Parks Properties Considered
Building Address Facility Type Square ft. Utility Spend Electrical Provider Gas Provider Water Provider Simpson Park 28505 Rawlings Rd Residential 5,000 $10,768 Southern California Edison SoCal Gas Lake Hemet Brubaker Park 1860 Cawston Ave Park N/A $38,738 Southern California Edison SoCal Gas EMWD Gibbel Park 2615 W
Devonshire Ave
Park/ Community
Center 1,170 $51,364 Southern California Edison SoCal Gas City of Hemet Weston Park
755 E Latham
Ave/130 N
Thompson
Park/ Community
Center 5,560 $14,000 Southern California Edison SoCal Gas City of Hemet Cawston Park 0 Cawston Ave
Park Park N/A $2,274 Southern California Edison SoCal Gas EMWD Spencer Park 1110 S Palm Ave Park N/A $6,234 Southern California Edison SoCal Gas City of Hemet

Page 23 of 1157 ends

15.F

Page 951 of 2163 ends

© 2020 Centrica Business Solutions

Page 17 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table 13– Fire Department Properties Considered
Building Address Facility Type Square ft. Utility Spend Electrical Provider Gas Provider Water Provider Police, Fire Station 1,
Council Chambers 220 N Juanita St
Office/ Public
Assembly/ Fire
Station
24,401 $107,208 Southern California Edison SoCal Gas City of Hemet Fire Station 2 895 W Stetson
Ave Fire Station 4,647 $8,311 Southern California Edison SoCal Gas EMWD Fire Station 3 4110 W
Devonshire Ave Fire Station 5,274 $7,392 Southern California Edison SoCal Gas EMWD Fire Station 4 1035 S Cawston
Ave Fire Station 9,757 $18,685 Southern California Edison SoCal Gas EMWD Fire Station 5 120 N Hemet Fire Station 2,352 $5,079 Southern California Edison SoCal Gas Lake Hemet Table 14– Police Department Properties Considered
Building Address Facility Type Square ft. Utility Spend Electrical Provider Gas Provider Water Provider Gang Task Force 395 E Latham Ave Office 3,015 $5,838 Southern California Edison SoCal Gas City of Hemet PACT 319 E Latham Ave Office 1,490 $5,054 Southern California Edison SoCal Gas City of Hemet Police, Fire Station 1,
Council Chambers 220 N Juanita St
Office/ Public
Assembly/ Fire
Station
24,401 $107,208 Southern California Edison SoCal Gas City of Hemet SWAT Command/ GIT 401 N Juanita St Office/ Storage 25,170 $12,826 Southern California Edison SoCal Gas City of Hemet Table 15– Landscape Maintenance District Properties Considered Building Address Facility Type Square ft. Utility Spend Electrical Provider Gas Provider Water Provider Rancho Diamonte Various Sidewalk
Landscaping N/A $49,325 Southern California Edison SoCal Gas EMWD Oltman Park 985 Cawston Ave Park N/A $15,195 Southern California Edison SoCal Gas EMWD Cottonwood
Neighborhood Various Sidewalk Landscaping N/A $45,390 Southern California Edison SoCal Gas EMWD

Page 24 of 1157 ends

15.F

Page 952 of 2163 ends

© 2020 Centrica Business Solutions

Page 18 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Building Address Facility Type Square ft. Utility Spend Electrical Provider Gas Provider Water Provider McSweeney Park 0 McSweeney
Pkwy Park N/A $10,829 Southern California Edison SoCal Gas EMWD Streetlighting
Management District Various Sidewalk Landscaping N/A $3,425 Southern California Edison SoCal Gas City of Hemet Stoney Mountain Park Shadestone Dr,
Hemet, CA 92545 Park N/A $1,324 Southern California Edison SoCal Gas EMWD Table 16- Basin Properties Considered
Building Address Facility Type Square ft. Utility Spend Electrical Provider Gas Provider Water Provider Mary Henley Park 2502 W Johnston Park N/A $125,478 Southern California Edison SoCal Gas City of Hemet

Page 25 of 1157 ends

15.F

Page 953 of 2163 ends

© 2020 Centrica Business Solutions

Page 19 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

3.0 Utility Analysis

3.1 UTILITY USAGE AND COST SUMMARY
City of Hemet currently spends $1,191,303 annually on utilities for listed sites listed below:
• Salon
• City Hall
• City Yard
• Covell Building
• Fire Training
• Gang Task Force
• Library
• PACT
• Police, Fire Station 1,
Council Chambers
• Fire Station 2
• Fire Station 3
• Fire Station 4
• Fire Station 5
• Park Hill Repeater
Building
• Shooting Range
• Simpson Center
• Simpson Park
• SWAT Command/ GIT
• Brubaker Park
• Gibbel Park - Lawn
Bowling
• Mary Henley Park
• Weston Park - Shuffle
Board
• Welch Memorial Green
• City Hall Overflow
Parking
• Downtown Parking Lot
• Parking Lot- Carmalita
St.
• Appeloosa Basin
• Catalina / Redbluff Basin
• Chestshire / Tabby Basin
• Clarence /
Commonwealth Basin
• Coramdeo / Fruitvale
Basin
• Haviture / Brittania
Basin
• Heartland 1 Basin
• La Familia / Hope Basin
• Sanderson / Esplanade
Basin
• Seattle Basin
• Silverdrop Basin
• Stoney Mountain Basin
• Bottletree Booster
(Booster #1)
• Fruitvale Booster
• Searl Booster (Well #13)
• 7 Hills Booster (Well
#16)
• Echo Hills Tanks (Tanks 3
& 4)
• Park Hills Tanks (Tanks 1
& 2)
• Well #12
• Well #14
• Well #15
• Well #2
• Well #3
• Well #4 / Palm Booster
• Streetside Irrigation
• Rancho Diamonte
(Streetside Irrigation)
• Oltman Park
• Autumn Ridge
Neighborhood
• Cottonwood
Neighborhood
• Woodcrest
Neighborhood Perimeter
• Montero Neighborhood
Park
• Cawston Park
• Spencer Park
• LLMD
Table 3 and Figure 1 summarize the energy cost allocated to electricity, natural gas, and water consumption for the for the baseline period (January 2020 – December 2020). Figure 1 indicates that electricity accounts for about 53% of the utility costs at the sites in scope. Water transmission accounts for 44% of utility cost and Natural Gas accounts for 3%.

Page 26 of 1157 ends

15.F

Page 954 of 2163 ends

© 2020 Centrica Business Solutions

Page 20 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table 3 - Annual Utility Usage and Cost Summary
Electricity Natural Gas Water
Consumption
(kWh) Cost Consumption (therms) Cost Consumption (kGal) Cost 4,263,468 $638,355 24,329 $24,084 95,188 $528,864
Figure 1 – Utility Breakout
Electricity
$638,355
Natural Gas 54%
$24,084
2%
Water
$528,864
44%

Page 27 of 1157 ends

15.F

Page 955 of 2163 ends

© 2020 Centrica Business Solutions

Page 21 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

3.2 UTILITY RATE REVIEW
Electric service to City of Hemet is provided by Southern California Edison (SCE) through several accounts listed under their respective sites below:

Site Acct No Utility
7 Hills Booster (Well 16) 28145139 Southern California Edison Brubaker Park 24587807 Southern California Edison
Catalina/ Redbluff Basin 33512192 Southern California Edison Chestshire & Tabby Basin 36591225 Southern California Edison City Hall 18197413 Southern California Edison
City Hall Overflow Parking 34491161 Southern California Edison Clarence/ Commonwealth Basin 28736525 Southern California Edison Coramdeo/ Fruitvale Basin 31026337 Southern California Edison Cottonwood Neighborhood 32423864 Southern California Edison Cottonwood Neighborhood 32423917 Southern California Edison Cottonwood Neighborhood 32426514 Southern California Edison Cottonwood Neighborhood 38249973 Southern California Edison Covell Building 1841781 Southern California Edison
Devonshire/ Sanderson Basin 29317199 Southern California Edison Downtown Parking Lot 15237359 Southern California Edison Echo Hills Tanks (Tanks 3 & 4) 1158749 Southern California Edison Edward J Rodeghier Memorial Green 842410 Southern California Edison Fire Station 2 1158873 Southern California Edison
Fire Station 3 5630630 Southern California Edison
Fire Station 4 25891468 Southern California Edison
Fire Station 5 25738789 Southern California Edison
Fruitvale Booster 43720302 Southern California Edison
Gibbel Park 1158779 Southern California Edison
Gibbel Park 1158784 Southern California Edison
GIT/ SWAT Command 28788708 Southern California Edison
GTF 31579752 Southern California Edison
GTF 31579775 Southern California Edison
Heartland 1 Basin 26584980 Southern California Edison

Page 28 of 1157 ends

15.F

Page 956 of 2163 ends

© 2020 Centrica Business Solutions

Page 22 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Site Acct No Utility
Heartland 2 Basin 27152866 Southern California Edison
Hemet Fire Training Center 18432624 Southern California Edison Hemet Library 21644812 Southern California Edison
La Familia/ Hope Basin 36789827 Southern California Edison Mary Henley Park 1772537 Southern California Edison
Mary Henley Park 3378525 Southern California Edison
Montana Neighborhood 32397019 Southern California Edison Montero Neighborhood 36789837 Southern California Edison Montero Neighborhood 36789843 Southern California Edison Old Paint Shop 1924000 Southern California Edison
Old Sisk Bldg 17787176 Southern California Edison
PACT 24511878 Southern California Edison
PACT 24511903 Southern California Edison
Park Hill Repeater Building 1158878 Southern California Edison Park Hills Tanks (Tanks 1 & 2) 1158740 Southern California Edison Parking Lot- Carmalita St. 870335 Southern California Edison Police/ Fire Station 1 1158724 Southern California Edison Public Works Yard 1158762 Southern California Edison
Public Works Yard 1158768 Southern California Edison
Public Works Yard 9560323 Southern California Edison
Salon 19085885 Southern California Edison
Salon 45348536 Southern California Edison
Sanderson/ Esplanade Basin 36705457 Southern California Edison Searl Booster (Well 13) 3766965 Southern California Edison Seattle Basin 8827072 Southern California Edison
Silverdrop Basin 32423881 Southern California Edison
Simpson Park 140013 Southern California Edison
Simpson Park 164252 Southern California Edison
Simpson Park 164258 Southern California Edison
Simpson Park 1158879 Southern California Edison
Simpson Park 1158881 Southern California Edison

Page 29 of 1157 ends

15.F

Page 957 of 2163 ends

© 2020 Centrica Business Solutions

Page 23 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Site Acct No Utility
Simpson Park 14923785 Southern California Edison
Stoney Mountain Basin 29681265 Southern California Edison Storage Apts 19085824 Southern California Edison
Storage Apts 21127591 Southern California Edison
Storage Apts 21803673 Southern California Edison
Storage Apts 26033314 Southern California Edison
Storage Apts 26033346 Southern California Edison
Storage Apts 26099187 Southern California Edison
Welch Memorial Green 24000441 Southern California Edison Well 10 51130802 Southern California Edison
Well 12 2003677 Southern California Edison
Well 14 17634044 Southern California Edison
Well 15 23045114 Southern California Edison
Well 2 1646128 Southern California Edison
Well 3 932199 Southern California Edison
Well 4/ Palm Booster 1158870 Southern California Edison Weston Park 1923899 Southern California Edison
Weston Park 24576012 Southern California Edison
Woodcrest Neighborhood 30641295 Southern California Edison Woodcrest Neighborhood 30641314 Southern California Edison Woodcrest Neighborhood 30641324 Southern California Edison

Page 30 of 1157 ends

15.F

Page 958 of 2163 ends

© 2020 Centrica Business Solutions

Page 24 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
The energy consumption rate components for the two different rates are shown in Table 4 below:

Table 4 – Southern California Edison Electric Rate Components Electric Energy Consumption
2020 Rates, per kWh/meter/month
Customer
Charge,
2020 Rates
Summer Winter
Rate Off-Peak On-Peak MidPeak
OffPeak
SuperOffPeak
OnPeakMidPeak Per Meter
AL-2F $0.0873 $0.0873 $0.0873 $0.0873 $0.0873 $0.087
3 $0.087
3 $9.36 per
month
TOU-GS1D $0.1106 $0.1690 $0.1600 $0.1106 $0.0906 n/a $0.163 6 $0.0457
per day
TOU-GS1E $0.1828 $0.4701 $0.2774 $0.1728 $0.1401 n/a $0.327 5 $0.457 per
day
TOU-PA2D $0.0928 $0.1565 $0.1477 $0.0986 $0.0891 n/a $0.115 1 $55.87 per
month
TOU-GS2D $0.0994 $0.1383 $0.1289 $0.1050 $0.0833 n/a $0.116 5 $158.71
per month
TOU-GS2E $0.1456 $0.5561 $0.2063 $0.1099 $0.1001 n/a $0.186 2 $158.71
per month
DOMESTIC $0.1389 $0.1389 $0.1389 $0.1389 $0.1389 $0.138 9 $0.138
9 $0.031 per
day
Natural gas service to the City of Hemet is provided by Southern California Gas to the sites and accounts listed below.

Site Acct No Utility
Covell Building 03682435007 Southern California Gas
Public Works Yard 19422505008 Southern California Gas
Library 0158894562 Southern California Gas
City Hall 19432435725 Southern California Gas
Police/ Fire Station 1 13552433008 Southern California Gas Fire Station 2 20052532007 Southern California Gas
Fire Station 3 05552545005 Southern California Gas
Fire Station 4 16839831845 Southern California Gas

Page 31 of 1157 ends

15.F

Page 959 of 2163 ends

© 2020 Centrica Business Solutions

Page 25 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Site Acct No Utility
Fire Station 5 16265395737 Southern California Gas
Gibbel Park (Lawn Bowling) 12272552006 Southern California Gas Simpson Center 08722433003 Southern California Gas
GTF 17962433391 Southern California Gas
Weston Park 16915239764 Southern California Gas
GIT/ SWAT Command 14602433568 Southern California Gas
Fire Training Center 17752433346 Southern California Gas PACT 17542433523 Southern California Gas
Natural Gas Vehicle Charge 04026816381 Southern California Gas Old Sisk Bldg 09142433235 Southern California Gas
Water service to the City of Hemet is provided by Eastern Municipal Water District (EMWD), Lake Hemet, and City of Hemet to the sites and accounts listed below.

Site Acct No Utility
City Hall 17-011017-02 City of Hemet
City Hall 17-011027-02 City of Hemet
City Hall 17-011037-02 City of Hemet
Covell Building 02-074152-01 City of Hemet
Downtown Parking Lot 03-094190-01 City of Hemet
Empty Grass Field 14-115098-01 City of Hemet
Fire Training Center 03-075149-02 City of Hemet
Gibbel Park 14-115095-01 City of Hemet
Gibbel Park 14-115096-01 City of Hemet
Gibbel Park 14-115097-01 City of Hemet
Gibbel Park 14-115099-01 City of Hemet
Gibbel Park 14-115196-01 City of Hemet
Gibbel Park 14-121000-01 City of Hemet
Gibbel Park 14-121200-01 City of Hemet
GIT/ SWAT Command 03-067250-02 City of Hemet

Page 32 of 1157 ends

15.F

Page 960 of 2163 ends

© 2020 Centrica Business Solutions

Page 26 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Site Acct No Utility
Griffith Park 18-016083-01 City of Hemet
GTF 03-075101-04 City of Hemet
Library 03-075057-01 City of Hemet
Library 03-075056-01 City of Hemet
Mary Henley Park 39-136000-01 City of Hemet
Mary Henley Park 39-136100-01 City of Hemet
Mary Henley Park 39-136112-02 City of Hemet
Mary Henley Park 39-136200-01 City of Hemet
Mary Henley Park 39-137129-01 City of Hemet
Mary Henley Park 37-137523-01 City of Hemet
Mary Henley Park 39-751000-01 City of Hemet
Old Print Shop 02-074142-01 City of Hemet
Old Sisk Bldg 03-067178-02 City of Hemet
PACT 03-075147-03 City of Hemet
Police/ Fire Station 1 03-075040-01 City of Hemet
Police/ Fire Station 1 03-075029-01 City of Hemet
Police/ Fire Station 1 03-075025-01 City of Hemet
Police/ Fire Station 1 03-075005-01 City of Hemet
Police/ Fire Station 1 03-075003-01 City of Hemet
Simpson Center 03-075066-01 City of Hemet
Small Grass Park 03-075129-03 City of Hemet
Spencer Park 42-095900-01 City of Hemet
Storage Apts 17-010036-01 City of Hemet
Storage Apts 17-010038-01 City of Hemet
Streetside Irrigation- Chanaral Ave 13-118137-01 City of Hemet Streetside Irrigation- Sanderson Ave 14-110078--02 City of Hemet Welch Park 03-075182-01 City of Hemet
Weston Park 02-073179-01 City of Hemet
Weston Park 02-073175-01 City of Hemet

Page 33 of 1157 ends

15.F

Page 961 of 2163 ends

© 2020 Centrica Business Solutions

Page 27 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Site Acct No Utility
Weston Park 02-073177-01 City of Hemet
Weston Park 02-074180-01 City of Hemet
Autumn Ridge Neighborhood 203621-02 EMWD
Autumn Ridge Neighborhood 203620-02 EMWD
Autumn Ridge Neighborhood 203619-02 EMWD
Brubaker Park 249421-02 EMWD
Brubaker Park 196114-01 EMWD
Cawston Park 239690-01 EMWD
Cottonwood Neighborhood 205127-02 EMWD
Cottonwood Neighborhood 205124-02 EMWD
Cottonwood Neighborhood 208622-02 EMWD
Cottonwood Neighborhood 205126-02 EMWD
Cottonwood Neighborhood Park 205125-02 EMWD
Fire Station 2 10783-01 EMWD
Fire Station 3 17889-04 EMWD
Fire Station 3 95304-01 EMWD
Fire Station 4 190884-01 EMWD
Fire Station 4 190886-01 EMWD
Flowerwood Neighborhood Park 204014-02 EMWD
McSweeney Park 228865-04 EMWD
Montero Neighborhood Park 216449-04 EMWD
Oltman Park 239713-01 EMWD
Public Works Yard 19953-23 EMWD
Public Works Yard 239668-01 EMWD
Public Works Yard 18985-23 EMWD
Rancho Diamonte Neighborhood 224626-02 EMWD
Rancho Diamonte Neighborhood 226309-02 EMWD
Rancho Diamonte Neighborhood 238624-03 EMWD
Stoney Mountain Neighborhood 196966-02 EMWD

Page 34 of 1157 ends

15.F

Page 962 of 2163 ends

© 2020 Centrica Business Solutions

Page 28 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Site Acct No Utility
Stoney Mountain Park 179435-02 EMWD
Streetside Irrigation- Auto Blvd 91612-02 EMWD
Streetside Irrigation- Florida Gas Plus 147104-04 EMWD
Streetside Irrigation- Lyon Ave 24241-02 EMWD
Streetside Irrigation- Lyon Ave 24239-02 EMWD
Woodcrest Neighborhood 187217-02 EMWD
Woodcrest Neighborhood 187218-02 EMWD
Fire Station 5 0101-00085-00 Lake Hemet
Fire Station 5 0101-0084-00 Lake Hemet
Simpson Park 1000-00322-00 Lake Hemet

3.3 BASELINE ANNUAL ENERGY USAGE AND UTILITY BENCHMARKING This section summarizes the baseline period energy usage for the buildings audited. Table 5 presents a summary of the utility consumption for each building by energy source for the baseline period (January 2020 – December 2020). A summary of the baseline period usage and cost data are provided in Appendix A.

Table 5 – Utility Consumption and Costs by Building, Gross Area Facility
Electric
Usage
(kWh/yr)
Natural Gas
Usage
(therm/yr)
Water
Usage
(kGal)
Annual
Utility Cost
Salon 668 - - $362
City Hall 325,686 3,875 221 $61,039
City Yard 282,349 11,307 1,489 $86,408
Covell Building 136,617 303 98 $24,308
Fire Training 11,064 415 30 $2,777
Gang Task Force 28,927 323 5 $5,924
Library 575,063 3,349 1,373 $113,824
PACT 21,923 582 50 $5,238
Police, Fire Station 1, Council Chambers 650,685 6,493 1,167 $108,482

Page 35 of 1157 ends

15.F

Page 963 of 2163 ends

© 2020 Centrica Business Solutions

Page 29 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility
Electric
Usage
(kWh/yr)
Natural Gas
Usage
(therm/yr)
Water
Usage
(kGal)
Annual
Utility Cost
Fire Station 2 39,448 921 72 $8,576
Fire Station 3 37,565 231 105 $7,392
Fire Station 4 97,907 1,382 150 $18,919
Fire Station 5 20,437 541 230 $5,164
Park Hill Repeater Building 1,757 - - $416
Shooting Range - - - -
Simpson Center 101,167 226 0 $22,853
Simpson Park 5,057 - 2,100 $10,768
SWAT Command/ GIT 67,975 781 22 $13,025
Brubaker Park 28,477 - 13,296 $38,738
Gibbel Park - Lawn Bowling 7,686 - 7,815 $51,364
Mary Henley Park 12,354 - 19,263 $125,478
Weston Park - Shuffleboard 5,756 65 2,005 $14,029
Welch Memorial Green 51 - - $131
City Hall Overflow Parking 8,170 - - $1,544
Downtown Parking Lot 5,581 - 222 $2,512
Parking Lot- Carmalita St. 41 - - $129
Appeloosa Basin 885 - - $255
Catalina / Redbluff Basin 2,469 - - $500
Chestshire / Tabby Basin 360 - - $181
Clarence / Commonwealth Basin 526 - - $202
Coramdeo / Fruitvale Basin 245 - - $161
Haviture / Brittania Basin - - - -
Heartland 1 Basin 225 - - $160
La Familia / Hope Basin 31 - - $127
Sanderson / Esplanade Basin 1,493 - - $358
Seattle Basin 13,969 - - $2,705
Silverdrop Basin 1,234 - - $312
Stoney Mountain Basin 7,774 - - $1,324

Page 36 of 1157 ends

15.F

Page 964 of 2163 ends

© 2020 Centrica Business Solutions

Page 30 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility
Electric
Usage
(kWh/yr)
Natural Gas
Usage
(therm/yr)
Water
Usage
(kGal)
Annual
Utility Cost
Bottletree Booster (Booster #1) 58,054 - - $8,263
Fruitvale Booster 60,994 - - $3,798
Searl Booster (Well #13) 96,547 - - $10,588
7 Hills Booster (Well #16) 53,362 - - $8,074
Echo Hills Tanks (Tanks 3 & 4) 4,983 - - $973
Park Hills Tanks (Tanks 1 & 2) 10,075 - - $985
Well #12 179,959 - - $14,611
Well #14 2,944 - - $866
Well #15 5,929 - - $3,412
Well #2 1,193,017 - - $129,196
Well #3 2,418 - - $1,008
Well #4 / Palm Booster 58,361 - - $8,144
Streetside Irrigation - - 11,645 $84,040
Rancho Diamonte (Streetside Irrigation) - - 6,814 $49,325 Oltman Park - - 6,253 $15,195
Autumn Ridge Neighborhood - - 2,791 $23,329
Cottonwood Neighborhood - - 5,715 $45,390
Woodcrest Neighborhood Perimeter - - 2,198 $15,944
Montero Neighborhood Park - - 1,866 $10,338
Cawston Park - - 936 $2,274
Spencer Park - - 974 $6,234
LLMD 19,195 - - $3,425
TOTALS 4,247,460 30,794 88,904 $1,181,097

Page 37 of 1157 ends

15.F

Page 965 of 2163 ends

© 2020 Centrica Business Solutions

Page 31 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
The table below displays the fraction of electricity, natural gas, and water consumption percentages for each site.

Table 6 - Electricity Usage by Building
Sites
Electric
Usage
(kWh)
Electric
Usage %
Natural
Gas Usage
(therm)
Natural
Gas
Usage
%
Water
Usage
(kGal)
Water
Usage
%
Salon 668 0.02% - - - -
City Hall 325,686 7.67% 3,875 12.58% 221 0.25%
City Yard 282,349 6.65% 11,307 36.72% 1,489 1.67%
Covell Building 136,617 3.22% 303 0.98% 98 0.11%
Fire Training 11,064 0.26% 415 1.35% 30 0.03%
Gang Task Force 28,927 0.68% 323 1.05% 5 0.01%
Library 575,063 13.54% 3,349 10.88% 1,373 1.54%
PACT 21,923 0.52% 582 1.89% 50 0.06%
Police, Fire Station 1, Council
Chambers 650,685 15.32% 6,493 21.09% 1,167 1.31%
Fire Station 2 39,448 0.93% 921 2.99% 72 0.08%
Fire Station 3 37,565 0.88% 231 0.75% 105 0.12%
Fire Station 4 97,907 2.31% 1,382 4.49% 150 0.17%
Fire Station 5 20,437 0.48% 541 1.76% 230 0.26%
Park Hill Repeater Building 1,757 0.04% - - - -
Shooting Range - - - - - -
Simpson Center 101,167 2.38% 226 0.73% - -
Simpson Park 5,057 0.12% - - 2,100 2.36%
SWAT Command/ GIT 67,975 1.60% 781 2.54% 22 0.02%
Brubaker Park 28,477 0.67% - - 13,296 14.96%
Gibbel Park - Lawn Bowling 7,686 0.18% - - 7,815 8.79%
Mary Henley Park 12,354 0.29% - - 19,263 21.67%
Weston Park - Shuffleboard 5,756 0.14% 65 0.21% 2,005 2.26% Welch Memorial Green 51 0.00% - - - -
City Hall Overflow Parking 8,170 0.19% - - - -
Downtown Parking Lot 5,581 0.13% - - 222 0.25%
Parking Lot- Carmalita St. 41 0.00% - - - -
Appeloosa Basin 885 0.02% - - - -
Catalina / Redbluff Basin 2,469 0.06% - - - -
Chestshire / Tabby Basin 360 0.01% - - - -
Clarence / Commonwealth
Basin 526 0.01% - - - -
Coramdeo / Fruitvale Basin 245 0.01% - - - -
Haviture / Brittania Basin - - - - - -
Heartland 1 Basin 225 0.01% - - - -

Page 38 of 1157 ends

15.F

Page 966 of 2163 ends

© 2020 Centrica Business Solutions

Page 32 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Sites
Electric
Usage
(kWh)
Electric
Usage %
Natural
Gas Usage
(therm)
Natural
Gas
Usage
%
Water
Usage
(kGal)
Water
Usage
%
La Familia / Hope Basin 31 0.00% - - - -
Sanderson / Esplanade Basin 1,493 0.04% - - - -
Seattle Basin 13,969 0.33% - - - -
Silverdrop Basin 1,234 0.03% - - - -
Stoney Mountain Basin 7,774 0.18% - - - -
Bottletree Booster (Booster
#1) 58,054 1.37% - - - -
Fruitvale Booster 60,994 1.44% - - - -
Searl Booster (Well #13) 96,547 2.27% - - - -
7 Hills Booster (Well #16) 53,362 1.26% - - - -
Echo Hills Tanks (Tanks 3 & 4) 4,983 0.12% - - - -
Park Hills Tanks (Tanks 1 & 2) 10,075 0.24% - - - -
Well #12 179,959 4.24% - - - -
Well #14 2,944 0.07% - - - -
Well #15 5,929 0.14% - - - -
Well #2 1,193,017 28.09% - - - -
Well #3 2,418 0.06% - - - -
Well #4 / Palm Booster 58,361 1.37% - - - -
Streetside Irrigation - - - - 11,645 13.10%
Rancho Diamonte (Streetside
Irrigation) - - - - 6,814 7.66%
Oltman Park - - - - 6,253 7.03%
Autumn Ridge Neighborhood - - - - 2,791 3.14%
Cottonwood Neighborhood - - - - 5,715 6.43%
Woodcrest Neighborhood
Perimeter - - - - 2,198 2.47%
Montero Neighborhood Park - - - - 1,866 2.10%
Cawston Park - - - - 936 1.05%
Spencer Park - - - - 974 1.10%
LLMD 19,195 0.45% - - - -
Totals 4,247,460 100% 30,794 100% 88,904 100%

Page 39 of 1157 ends

15.F

Page 967 of 2163 ends

© 2020 Centrica Business Solutions

Page 33 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table 7 presents the unit cost of energy and water.

Table 7 – Unit Cost of Energy and Water
Facility
Unit Cost of
Electricity
($/kWh)
Unit Cost of
Natural Gas
($/therm)
Unit Cost
of Water
($/kGal)
7 Hills Booster (Well #16) $0.1513 N/A N/A
Appeloosa Basin $0.2884 N/A N/A
Autumn Ridge Neighborhood N/A N/A $2.430
Bottletree Booster (Booster #1) $0.1423 N/A N/A
Brubaker Park $0.2266 $1.1850 $6.398
Catalina / Redbluff Basin $0.2027 N/A N/A
Cawston Park N/A N/A $5.539
Chestshire / Tabby Basin $0.5021 N/A N/A
City Hall $0.1700 $1.109 $6.402
City Hall Overflow Parking $0.1890 N/A N/A
City Yard $0.2153 $0.8737 $10.524
Clarence / Commonwealth Basin $0.3839 N/A N/A
Coramdeo / Fruitvale Basin $0.6590 N/A N/A
Cottonwood Neighborhood N/A N/A $8.359
Covell Building $0.1708 $1.1716 $6.385
Downtown Parking Lot $0.1951 N/A N/A
Echo Hills Tanks (Tanks 3 & 4) $0.1954 N/A N/A
Fire Station 2 $0.1827 $1.1663 $4.158
Fire Station 3 $0.1824 $1.1730 $2.553
Fire Station 4 $0.1705 $1.1654 $4.137
Fire Station 5 $0.1857 $1.1370 $3.261
Fire Training $0.1898 $1.1834 $6.392
Fruitvale Booster $0.0623 N/A N/A
Gang Task Force $0.1906 $1.1732 $6.385
Gibbel Park - Lawn Bowling $0.1809 N/A $2.428
Haviture / Brittania Basin No Data N/A N/A
Heartland 1 Basin $0.7131 N/A N/A

Page 40 of 1157 ends

15.F

Page 968 of 2163 ends

© 2020 Centrica Business Solutions

Page 34 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility
Unit Cost of
Electricity
($/kWh)
Unit Cost of
Natural Gas
($/therm)
Unit Cost
of Water
($/kGal)
La Familia / Hope Basin $4.0813 N/A N/A
Library $0.1770 $0.9928 $6.394
LLMD $0.1785 N/A $6.399
Mary Henley Park $0.1762 N/A $6.395
McSweeney Park N/A N/A N/A
Montero Neighborhood Park N/A N/A $7.253
Oltman Park N/A N/A $7.238
PACT $0.1936 $1.1590 $6.392
Park Hill Repeater Building $0.2366 N/A N/A
Park Hills Tanks (Tanks 1 & 2) $0.0977 N/A N/A
Parking Lot- Carmalita St. $3.1459 N/A $6.400
Police, Fire Station 1, Council Chambers $0.1458 $0.9567 $6.389 Rancho Diamonte (Streetside Irrigation) N/A N/A $7.217
Salon $0.5414 N/A No Data
Sanderson / Esplanade Basin $0.2401 N/A N/A
Searl Booster (Well #13) $0.1097 N/A N/A
Seattle Basin $0.1936 N/A N/A
Silverdrop Basin $0.2531 N/A N/A
Simpson Center $0.2233 N/A No Data
Simpson Park $0.2376 $1.1627 $6.462
Spencer Park N/A N/A $2.431
Stoney Mountain Basin $0.1703 N/A N/A
Streetside Irrigation N/A N/A N/A
SWAT Command/ GIT $0.1761 N/A $4.556
Welch Memorial Green $2.5604 $1.2276 $6.413
Well #10 $0.3551 N/A N/A
Well #12 $0.0812 N/A N/A
Well #14 $0.2942 N/A N/A
Well #15 $0.5755 N/A N/A

Page 41 of 1157 ends

15.F

Page 969 of 2163 ends

© 2020 Centrica Business Solutions

Page 35 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility
Unit Cost of
Electricity
($/kWh)
Unit Cost of
Natural Gas
($/therm)
Unit Cost
of Water
($/kGal)
Well #2 $0.1083 N/A N/A
Well #3 $0.4167 N/A N/A
Well #4 / Palm Booster $0.1396 N/A N/A
Weston Park - Shuffleboard $0.1873 N/A $6.401
Woodcrest Neighborhood Perimeter N/A N/A $7.943

3.4 RECONCILIATION OF USAGE TO BASELINE
The data used for the energy and water baseline have been reviewed, and no unusual findings were present.

Page 42 of 1157 ends

15.F

Page 970 of 2163 ends

© 2020 Centrica Business Solutions

Page 36 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.0 Facility Improvements

4.1 FIM #1 INTERIOR LED LIGHTING UPGRADES
Annual Cost Savings Implementation Cost Incentive/Rebate $65,270 $739,373 $0

FACILITIES AFFECTED
This FIM will be completed in following facilities:
• Brubaker Park
• City Hall
• City Yard
• Fire Station 2
• Fire Station 4
• Gang Task Force
• Gibbel Park - Lawn Bowling
• Library
• PACT
• Police, Fire Station 1, Council Chambers
• Salon
• Shooting Range
• Simpson Center
• Simpson Park
• SWAT Command/ GIT
• Weston Park - Shuffleboard
Table 8 provides savings summary for affected sites.

Table 8 – Lighting Savings Summary by Site
Facility Name Annual Utility Savings
(per yr)
Operational Savings
(per yr)
Total Annual
Cost Savings
Brubaker Park $1,759 $88 $1,846
City Hall $6,329 $612 $6,941
City Yard $7,301 $297 $7,598
Fire Station 2 $709 $38 $746
Fire Station 4 $3,544 $486 $4,030
Gang Task Force $1,010 $37 $1,047
Gibbel Park - Lawn Bowling $599 $31 $630
Library $19,161 $2,363 $21,525
PACT $1,170 $41 $1,211
Police, Fire Station 1, Council Chambers $7,910 $548 $8,457 Salon $- $- $-
Shooting Range $- $76 $76
Simpson Center $7,925 $983 $8,908
Simpson Park $323 $18 $341

Page 43 of 1157 ends

15.F

Page 971 of 2163 ends

© 2020 Centrica Business Solutions

Page 37 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Annual Utility Savings
(per yr)
Operational Savings
(per yr)
Total Annual
Cost Savings
SWAT Command/ GIT $1,273 $56 $1,329
Weston Park - Shuffleboard $566 $19 $585
TOTAL $59,579 $5,693 $65,270

OBSERVATION
A detailed audit of existing interior lighting was conducted at above sites. There was a mix of lighting technologies, luminaire types and control strategies. Table 9 shows breakdown of existing fixture types by site.

Table 9 - Existing Exterior Lighting Fixture Summary
Facility Name Fixture Type Quantity
Brubaker Park Fluorescent, (4) 48" T12 40W lamps, Energy Saving Magnetic Ballast
22 Brubaker Park Compact Fluorescent, (1) 26W lamp 12
Brubaker Park Fluorescent, (2) 48" T12 40W lamps, Energy Saving Magnetic Ballast
10 Brubaker Park Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
3 Brubaker Park Fluorescent, (2) U-Tube, T-8 lamps, Instant Start Ballast 1 City Hall Fluorescent, (1) 48", T-8 lamp, Rapid Start Ballast, NLO (BF: .85-.95)
81 City Hall Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
306
City Hall EXIT Compact Fluorescent, (2) 9W lamp 12
City Hall LED Luminaire 45
City Hall Compact Fluorescent, (2) 13W lamp 12
City Hall EXIT radioactive 2
City Hall Emergency egress, 2-lamp, incandescent 11
City Hall Fluorescent, (2) U-Tube, T-8 lamps, Instant Start Ballast 3 City Hall Fluorescent, (2) 24", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
16 City Hall Compact Fluorescent, (1) 26W lamp 15
City Hall EXIT Light Emitting Diode, (1) 0.5W lamp, Single Sided 1

Page 44 of 1157 ends

15.F

Page 972 of 2163 ends

© 2020 Centrica Business Solutions

Page 38 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
City Hall Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
2 City Hall 100w Metal Halide 5
City Hall Fluorescent, (4) 24", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
8 City Hall Incandescent, (1) 300W lamp 1
City Hall Incandescent, (1) 170W lamp 1
City Hall Fluorescent, CircleLite, (1) 22W lamp, PreHeat Blst 1 City Yard Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
142
City Yard Compact Fluorescent, (2) 26W lamp 1
City Yard Incandescent, (1) 60W lamp 3
City Yard Fluorescent, (2) U-Tube, T-8 lamps, Instant Start Ballast 1 City Yard Fluorescent, (1) 48", T-8 lamp, Rapid Start Ballast, NLO (BF: .85-.95)
10 City Yard Fluorescent, (2) 96", ES HO lamp 58
City Yard Fluorescent, (6) 48", T-8 lamps, (2) IS Ballasts, NLO (0.85 < BF < 0.95)
74 City Yard Fluorescent, (2) 24", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
2 City Yard Compact Fluorescent, (1) 26W lamp 1
City Yard LED Luminaire 3
City Yard Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
1 Fire Station 2 LED Luminaire 21
Fire Station 2 Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
13 Fire Station 2 Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
7 Fire Station 2 Incandescent, (1) 60W lamp 1
Fire Station 2 Fluorescent, (2) 48" T12 40W lamps, Energy Saving Magnetic Ballast
2 Fire Station 4 Compact Fluorescent, (1) 26W lamp 2
Fire Station 4 EXIT Compact Fluorescent, (2) 9W lamp 6

Page 45 of 1157 ends

15.F

Page 973 of 2163 ends

© 2020 Centrica Business Solutions

Page 39 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
Fire Station 4 Recessed Can Hi-Hat Fixture w/(1) PL 26w CF Quad Lamps 14 Fire Station 4 Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
100
Fire Station 4 Recessed Can Hi-Hat Fixture w/(2) PL 26w CF Quad Lamps 4 Fire Station 4 Fluorescent, (3) 48" T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
3 Fire Station 4 Fluorescent, (2) 48" T12 40W lamps, Energy Saving Magnetic Ballast
2 Fire Station 4 Fluorescent, (2) 36", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
12 Fire Station 4 Fluorescent, (2) 24", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
4 Gang Task Force Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
2 Gang Task Force EXIT radioactive 3
Gang Task Force LED Luminaire 6
Gang Task Force Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
14 Gang Task Force Fluorescent, (2) 96", ES HO lamp 1
Gang Task Force Compact Fluorescent, (1) 26W lamp 2
Gibbel Park - Lawn Bowling Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
5 Gibbel Park - Lawn Bowling Fluorescent, (2) 36", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
1 Gibbel Park - Lawn Bowling Fluorescent, (2) 48" T12 40W lamps, Energy Saving Magnetic Ballast
1 Gibbel Park - Lawn Bowling Fluorescent, (3) 48" T12 40W lamps, Energy Saving Magnetic Ballast
8 Gibbel Park - Lawn Bowling LED Luminaire 6
Gibbel Park - Lawn Bowling Incandescent, (1) 60W lamp 1 Library Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
70 Library Fluorescent, (3) 48" T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
39

Page 46 of 1157 ends

15.F

Page 974 of 2163 ends

© 2020 Centrica Business Solutions

Page 40 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
Library Fluorescent, (2) 36", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
14 Library EXIT radioactive 28
Library Recessed Can Hi-Hat Fixture w/(1) PL 42w CF Quad Lamp 91 Library Fluorescent, (4) 24", STD lamps 324
Library Incandescent, (1) 60W lamp 2
Library Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
6 Library Fluorescent (2) 45.8" T-5 HO lamps, (1) PRS Electronic Ballast, HLO (.95 < BF < 1.1)
85 Library Fluorescent (1) 45.8" T-5 HO lamp, (1) PRS Electronic Ballast, HLO (.95 < BF < 1.1)
57 Library Fluorescent, (2) 48", 2 x T-5 lamp, Instant Start Ballast 7 Library Fluorescent, (2) 24", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
1 Library 70w High Pressure Sodium 10
Library 150w Metal Halide 4
Library Incandescent, (1) 50W lamp 5
Library Compact Fluorescent, (1) 26W lamp 1
PACT Compact Fluorescent, (2) 26W lamp 1
PACT Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
38 PACT Emergency egress, 2-lamp, incandescent 2
Police, Fire Station 1, Council
Chambers
Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
366
Police, Fire Station 1, Council
Chambers
LED Luminaire 132
Police, Fire Station 1, Council
Chambers
EXIT Compact Fluorescent, (1) 9W lamp 7
Police, Fire Station 1, Council
Chambers
Emergency egress, 2-lamp, incandescent 4
Police, Fire Station 1, Council
Chambers
EXIT Light Emitting Diode, (1) 0.5W lamp, Single Sided 10

Page 47 of 1157 ends

15.F

Page 975 of 2163 ends

© 2020 Centrica Business Solutions

Page 41 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
Police, Fire Station 1, Council
Chambers
Fluorescent, (1) 48", T-8 lamp, Rapid Start Ballast, NLO (BF: .85-.95)
13 Police, Fire Station 1, Council
Chambers
EXIT Compact Fluorescent, (2) 9W lamp 5
Police, Fire Station 1, Council
Chambers
Fluorescent, (2) U-Tube, T-8 lamps, Instant Start Ballast 4 Police, Fire Station 1, Council
Chambers
Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
6 Police, Fire Station 1, Council
Chambers
Compact Fluorescent, (1) 26W lamp 2
Police, Fire Station 1, Council
Chambers
No Action 1
Police, Fire Station 1, Council
Chambers
Fluorescent, (2) 48" T12 34W lamps, Energy Saving
Magnetic Ballast
16 Police, Fire Station 1, Council
Chambers
Adding to this location 3
Salon Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
21 Salon 75w Incand. 1 Lamp Vanity Fixture w/ Blower 1
Salon LED Luminaire 1
Salon Incandescent, (1) 60W lamp 3
Salon Fluorescent, (2) U-Tube, T-8 lamps, Instant Start Ballast 4 Salon Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
4 Salon Compact Fluorescent, (1) 26W lamp 19
Salon Fluorescent, (2) 96", ES HO lamp 1
Shooting Range Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
15 Shooting Range EXIT Compact Fluorescent, (2) 9W lamp 2 Simpson Center Compact Fluorescent, (1) 26W lamp 37
Simpson Center EXIT Compact Fluorescent, (2) 9W lamp 24 Simpson Center Fluorescent, (2) 48" T12 40W lamps, Energy Saving Magnetic Ballast
20 Simpson Center Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
156

Page 48 of 1157 ends

15.F

Page 976 of 2163 ends

© 2020 Centrica Business Solutions

Page 42 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
Simpson Center Fluorescent, (4) 48" T12 34W lamps, Energy Saving Magnetic Ballast
1 Simpson Center Emergency egress, 2-lamp, incandescent 9 Simpson Center Incandescent, (1) 90W lamp 29
Simpson Center Fluorescent, (1) 48", T-8 lamp, Rapid Start Ballast, NLO (BF: .85-.95)
18 Simpson Center Fluorescent, (2) U-Tube, T-8 lamps, Instant Start Ballast 15 Simpson Center Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
9 Simpson Center Fluorescent, CircleLite, (1) 22W lamp, PreHeat Blst 1 Simpson Center Compact Fluorescent, (2) 13W lamp 24
Simpson Center Incandescent, (1) 60W lamp 11
Simpson Center 100w Metal Halide 6
Simpson Center Fluorescent, (3) 48" T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
1 Simpson Park Compact Fluorescent, (1) 26W lamp 5
Simpson Park Incandescent, (1) 120W lamp 5
Simpson Park Fluorescent, (2) 48" T12 40W lamps, Energy Saving Magnetic Ballast
3 Simpson Park Incandescent, (1) 150W lamp 1
Simpson Park Incandescent, (1) 300W lamp 1
Simpson Park Incandescent, (1) 170W lamp 1
Simpson Park Compact Fluorescent, (2) 26W lamp 3
Simpson Park LED Luminaire 9
Simpson Park Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
3 Simpson Park Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
1 SWAT Command/ GIT LED Luminaire 1
SWAT Command/ GIT Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
31 SWAT Command/ GIT Compact Fluorescent, (1) 26W lamp 1

Page 49 of 1157 ends

15.F

Page 977 of 2163 ends

© 2020 Centrica Business Solutions

Page 43 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
SWAT Command/ GIT Fluorescent, (6) 48", T-8 lamps, (2) IS Ballasts, NLO (0.85 < BF < 0.95)
24 SWAT Command/ GIT Emergency egress, 2-lamp, incandescent 1 Weston Park - Shuffleboard Fluorescent, (2) 48" T12 40W lamps, Energy Saving Magnetic Ballast
3 Weston Park - Shuffleboard Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
25 Weston Park - Shuffleboard LED Luminaire 9
Weston Park - Shuffleboard Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
24 Weston Park - Shuffleboard EXIT Light Emitting Diode, (1) 0.5W lamp, Single Sided 3 Weston Park - Shuffleboard Fluorescent, (2) 96", T-8 lamps, Instant Start Ballast, NLO (0.85 < BF < 0.95)
2 Total 3,049

RECOMMENDATION
Centrica recommends replacing fixtures/ lamps identified in Table 9 with an LED solution. All fixtures and retrofit kits shall be DesignLights Consortium (DLC) approved. Motion sensors and lighting controls shall be installed where required to comply with CA Title 24 energy code.

Existing fixtures, lamps, and ballasts, as well as any metal and cardboard will be recycled. Centrica will be responsible for disposal and recycling of existing lighting fixtures. Centrica will provide all necessary aerial equipment for safe and proper replacement of light fixtures in accordance with Cal/OSHA and local codes and ordinances.

Table 10 provides a summary of proposed lighting upgrades by fixture type. Appendix A provides detailed line-by-line summary of lighting upgrades and locations. Appendix C provides cut sheets for materials described in Table 10.

Table 10 – Lighting Fixture Upgrades Summary
Fixture Upgrade Description Qty
LED Strip Retrokit 4' 238
LED Strip Retrokit 8' 122
LED Troffer Retrokit 1,527
New Exit Sign 90
New LED High Bay 98
New LED Wrap 61

Page 50 of 1157 ends

15.F

Page 978 of 2163 ends

© 2020 Centrica Business Solutions

Page 44 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Fixture Upgrade Description Qty
New Wall Pack 6
New Wrap 4' 246
New Wrap 8' 112
Rebuild 22
Relamp 57
Retro Kit Can to LED 180
TOTAL 2,759

SAVINGS SUMMARY
Savings for lighting measures are based on two components:
• Energy savings associated with a reduction in lamp/fixture power • Reduction in operating costs associated with the increased life of new LED lighting.

For each site, lighting energy savings for retrofits are based on following calculation:

Energy Savings (kWh/yr) = (kWbefore - kWafter) × Operating Hours Retrofit strategies are developed and calculations are repeated for proposed or post-retrofit configuration. Further, installation of occupancy sensor control is anticipated to reduce annual hours of operation in those spaces where sensors are installed. While savings from occupancy sensors are expected, savings associated with a reduction in operating hours have not been estimated for this FIM.

Annual operating cost savings are based on replacement costs for ballasts and lamps as shown in following calculation. Note that no labor savings are included, only material replacement costs. Table 11 shows replacement cost savings using equation below.

Replacement Cost Savings = Quantity × Unit Annual Cost per Item Table 11 – Lighting Lamp and Ballast Material Cost Savings Components
Avg
Annual
Run
Hours
Avg
Rated
Lamp
Life
(hours)
Avg
Rated
Ballast
Life
(hours)
Lamp
Qty
Ballast
Qty
Annual
Lamp
Cost
Annual
Ballast
Cost
Total
Annual
Line Item
Cost
Compact
Fluorescent
(CFL) Lamp and
Ballast
4,466 6,000 24,286 399 109 $1,909 $39 $1,947
HID Lamp and
Ballast
1,860 21,333 80,000 25 14 $41 $25 $66

Page 51 of 1157 ends

15.F

Page 979 of 2163 ends

© 2020 Centrica Business Solutions

Page 45 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Components
Avg
Annual
Run
Hours
Avg
Rated
Lamp
Life
(hours)
Avg
Rated
Ballast
Life
(hours)
Lamp
Qty
Ballast
Qty
Annual
Lamp
Cost
Annual
Ballast
Cost
Total
Annual
Line Item
Cost
Incandescent
Lamp
721 17,947 - 120 - $52 $- $52
T-5 Fluorescent
Lamp and
Ballast
2,086 30,750 100,000 241 149 $81 $90 $172
T-8 Fluorescent
Lamp and
Ballast
2,806 34,159 94,246 5,381 2,203 $2,383 $868 $3,250
T-12
Fluorescent
Lamp and
Ballast
2,263 20,000 50,000 226 88 $123 $77 $200
Existing LED 4,229 14,952 - 247 - $4 $- $4
TOTAL 6,639 2,563 $4,592 $1,100 $5,692

BASELINE USAGE AND COST
Energy baseline for this FIM is defined as the existing annual electric energy usage and lamp/ballast replacement costs for lighting at these facilities as shown in the Table 12 below.

Table 12 – FIM #1 Baseline Usage and Costs
Building
Electrical
Consumption
(kWh/yr)
Electrical
Annual Cost
(per year)
Lamp/Ballast
Annual
Replacement Cost
(per year)
Total Annual
Cost
(per year)
Brubaker Park 12,682 $2,111 $88 $2,198
City Hall 54,484 $9,260 $612 $9,872
City Yard 53,561 $11,534 $297 $11,831
Fire Station 2 8,483 $1,550 $38 $1,588
Fire Station 4 30,150 $5,140 $486 $5,626
Gang Task Force 7,333 $1,398 $37 $1,434
Gibbel Park - Lawn Bowling 4,080 $738 $31 $769
Library 142,169 $25,157 $2,363 $27,520

Page 52 of 1157 ends

15.F

Page 980 of 2163 ends

© 2020 Centrica Business Solutions

Page 46 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Building
Electrical
Consumption
(kWh/yr)
Electrical
Annual Cost
(per year)
Lamp/Ballast
Annual
Replacement Cost
(per year)
Total Annual
Cost
(per year)
PACT 8,393 $1,625 $41 $1,665
Police, Fire Station 1, Council
Chambers
85,318 $12,439 $548 $12,986
Salon - $- $- $-
Shooting Range 6,482 $1,353 $76 $1,429
Simpson Center 48,203 $10,763 $983 $11,746
Simpson Park 2,181 $518 $18 $536
SWAT Command/ GIT 12,682 $2,233 $56 $2,289
Weston Park - Shuffleboard 4,591 $890 $19 $909
TOTAL 480,792 $86,709 $5,693 $92,398

Page 53 of 1157 ends

15.F

Page 981 of 2163 ends

© 2020 Centrica Business Solutions

Page 47 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

POST RETROFIT ENERGY USE AND COST
The projected energy use and cost for this FIM are shown in the table below.

Table 13 – FIM #1 Post Retrofit Energy Usage and Costs
Building
Electrical
Consumption
(kWh/yr)
Electrical
Annual
Cost
(per year)
Lamp/Ballast
Annual
Replacement
Cost
(per year)
Total
Annual Cost
(per year)
Brubaker Park 1,475 $334 $- $334
City Hall 16,869 $2,867 $- $2,867
City Yard 17,243 $3,713 $- $3,713
Fire Station 2 4,566 $834 $- $834
Fire Station 4 8,395 $1,431 $- $1,431
Gang Task Force 1,980 $377 $- $377
Gibbel Park - Lawn Bowling 733 $133 $- $133
Library 32,790 $5,802 $- $5,802
PACT 2,289 $443 $- $443
Police, Fire Station 1, Council
Chambers
30,513 $4,449 $- $4,449
Salon - $- $- $-
Shooting Range 1,321 $276 $- $276
Simpson Center 12,355 $2,759 $- $2,759
Simpson Park 800 $190 $- $190
SWAT Command/ GIT 5,138 $905 $- $905
Weston Park - Shuffleboard 1,533 $297 $- $297
TOTAL 138,000 $24,810 $0 $24,810

Page 54 of 1157 ends

15.F

Page 982 of 2163 ends

© 2020 Centrica Business Solutions

Page 48 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

ENERGY AND COST SAVINGS
The savings are the difference between the Baseline and the Post Retrofit energy usage and cost savings as summarized in the table that follows. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 14 – FIM #1 Energy and Cost Savings
Building
Electric
Consumption
Savings
(kWh/yr)
Electrical Cost
Savings
(per year)
Replacement
Cost Savings
(per year)
Total
Annual Cost
Savings
(per year)
Brubaker Park 7,760 $1,759 $88 $1,846
City Hall 37,239 $6,329 $612 $6,941
City Yard 33,905 $7,301 $297 $7,598
Fire Station 2 3,878 $709 $38 $746
Fire Station 4 20,788 $3,544 $486 $4,030
Gang Task Force 5,300 $1,010 $37 $1,047
Gibbel Park - Lawn Bowling 3,313 $599 $31 $630
Library 108,285 $19,161 $2,363 $21,525
PACT 6,043 $1,170 $41 $1,211
Police, Fire Station 1, Council
Chambers
54,253 $7,910 $548 $8,457
Salon - $- $- $-
Shooting Range 5,110 $- $76 $76
Simpson Center 35,490 $7,925 $983 $8,908
Simpson Park 1,361 $323 $18 $341
SWAT Command/ GIT 7,227 $1,273 $56 $1,329
Weston Park - Shuffleboard 3,023 $566 $19 $585
TOTAL 332,975 $59,579 $5,693 $65,270

Page 55 of 1157 ends

15.F

Page 983 of 2163 ends

© 2020 Centrica Business Solutions

Page 49 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.2 FIM #2: EXTERIOR LED LIGHTING UPGRADES
Annual Cost Savings Implementation Cost Incentive/Rebate $24,726 $231,991 $0

FACILITIES AFFECTED
This FIM will be completed in the following facilities: Abelia Sports Park • Brubaker Park
• City Hall
• City Hall Overflow Parking
• City Yard
• Fire Station 2
• Fire Station 4
• Gang Task Force
• Gibbel Park - Lawn Bowling
• Library
• LLMD
• Mary Henley Park
• PACT
• Police, Fire Station 1, Council Chambers
• Salon
• Shooting Range
• Simpson Center
• Simpson Park
• SWAT Command/ GIT
• Weston Park - Shuffle Board
A savings summary for the affected sites is provided in Table 15.

Table 15 – Lighting Savings Summary by Site
Facility Name Annual Utility Savings
(per yr)
Operational Savings
(per yr)
Total Annual
Cost Savings
Brubaker Park $640 $49 $689
City Hall $1,625 $151 $1,776
City Hall Overflow Parking $483 $42 $524
City Yard $805 $223 $1,028
Fire Station 2 $68 $4 $72
Fire Station 4 $1,268 $145 $1,413
Gang Task Force $155 $20 $175
Gibbel Park - Lawn Bowling $(691) $47 $(644)
Library $2,120 $329 $2,449
LLMD $8,980 $753 $9,733
Mary Henley Park $240 $17 $256
PACT $192 $27 $219
Police, Fire Station 1, Council
Chambers
$921 $170 $1,091
Salon $2,759 $38 $2,797

Page 56 of 1157 ends

15.F

Page 984 of 2163 ends

© 2020 Centrica Business Solutions

Page 50 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Annual Utility Savings
(per yr)
Operational Savings
(per yr)
Total Annual
Cost Savings
Shooting Range $- $31 $31
Simpson Center $1,021 $129 $1,150
Simpson Park $13 $2 $14
SWAT Command/ GIT $1,824 $107 $1,931
Weston Park - Shuffleboard $21 $2 $22
TOTAL $22,444 $2,286 $24,726

OBSERVATIONS
A detailed audit of the existing exterior lighting was conducted at the above sites. While on site, Centrica noticed a mix of lighting technologies, luminaire types and control strategies. A breakdown of existing fixture types by site is provided in the Table 16 below.

Table 16 – Existing Exterior Lighting Fixture Summary
Facility Name Fixture Type Quantity
Brubaker Park Incandescent, (1) 100W lamp 5
Brubaker Park Compact Fluorescent, (1) 26W lamp 1
Brubaker Park Low-Pressure Sodium, S54, 100w 2
City Hall Compact Fluorescent, (1) 26W lamp 22
City Hall LED Luminaire 3
City Hall Compact Fluorescent, (2) 26W lamp 3
City Hall 70w High Pressure Sodium 1
City Hall 250w Metal Halide 8
City Hall Overflow Parking 250w Metal Halide 4
City Hall Overflow Parking No Action 3
City Yard Compact Fluorescent, (1) 26W lamp 9
City Yard 70w High Pressure Sodium 2
City Yard 400w High Pressure Sodium 4
City Yard Compact Fluorescent, (2) 26W lamp 2
City Yard No Action 1
City Yard Incandescent, (1) 120W lamp 2
City Yard 70w Metal Halide 2
City Yard 175w High Pressure Sodium 12

Page 57 of 1157 ends

15.F

Page 985 of 2163 ends

© 2020 Centrica Business Solutions

Page 51 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
City Yard - -
City Yard LED Luminaire 2
City Yard Low-Pressure Sodium, S55, 150w 21
Fire Station 2 LED Luminaire 9
Fire Station 2 Incandescent, (1) 120W lamp 1
Fire Station 4 100w Metal Halide 10
Fire Station 4 LED Luminaire 16
Fire Station 4 70w High Pressure Sodium 7
Fire Station 4 Incandescent, (1) 120W lamp 3
Fire Station 4 50w Metal Halide 5
Gang Task Force Incandescent, (1) 120W lamp 1
Gang Task Force Compact Fluorescent, (1) 26W lamp 7
Gang Task Force LED Luminaire 1
Gibbel Park - Lawn Bowling No Action 11
Gibbel Park - Lawn Bowling Low-Pressure Sodium, S68, 50w 2 Gibbel Park - Lawn Bowling 175w High Pressure Sodium 3
Gibbel Park - Lawn Bowling Compact Fluorescent, (1) 26W lamp 2 Gibbel Park - Lawn Bowling Low-Pressure Sodium, S54, 100w 18 Gibbel Park - Lawn Bowling LED Luminaire 47
Gibbel Park - Lawn Bowling Incandescent, (1) 120W lamp 1 Library 70w Metal Halide 16
Library LED Luminaire 34
Library EXIT radioactive 1
Library Compact Fluorescent, (1) 26W lamp 8
Library Incandescent, (1) 40W lamp 30
Library Recessed Can Hi-Hat Fixture w/(1) PL 42w CF Quad Lamp
3 Library 250w High Pressure Sodium 9
LLMD Low-Pressure Sodium, S68, 50w 491
Mary Henley Park Low-Pressure Sodium, S54, 100w 11
PACT LED Luminaire 1

Page 58 of 1157 ends

15.F

Page 986 of 2163 ends

© 2020 Centrica Business Solutions

Page 52 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
PACT 70w High Pressure Sodium 4
Police, Fire Station 1, Council
Chambers
70w High Pressure Sodium 16
Police, Fire Station 1, Council
Chambers
Compact Fluorescent, (1) 26W lamp 26
Police, Fire Station 1, Council
Chambers
LED Luminaire 21
Police, Fire Station 1, Council
Chambers
Compact Fluorescent, (1) 42W lamp 3
Salon 250w High Pressure Sodium 2
Salon 1000w Metal Halide 1
Salon Low-Pressure Sodium, S68, 50w 2
Salon Incandescent, (1) 120W lamp 2
Salon Compact Fluorescent, (1) 26W lamp 10
Shooting Range Incandescent, (1) 100W lamp 7
Shooting Range Fluorescent, (4) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
3 Shooting Range Fluorescent, (2) 48", T-8 lamp, Instant Start Ballast, NLO (BF: .85-.95)
2 Simpson Center Compact Fluorescent, (1) 26W lamp 17
Simpson Center LED Luminaire 8
Simpson Center 70w High Pressure Sodium 12
Simpson Center Low-Pressure Sodium, S68, 50w 2
Simpson Center 150w Metal Halide 1
Simpson Park Incandescent, (1) 100W lamp 1
Simpson Park Incandescent, (1) 75W lamp 1
Simpson Park Compact Fluorescent, (2) 26W lamp 3
Simpson Park Incandescent, (1) 50W lamp 1
Simpson Park No Action 6
SWAT Command/ GIT 70w High Pressure Sodium 2
SWAT Command/ GIT - 1
SWAT Command/ GIT Compact Fluorescent, (1) 26W lamp 1
SWAT Command/ GIT LED Luminaire 1

Page 59 of 1157 ends

15.F

Page 987 of 2163 ends

© 2020 Centrica Business Solutions

Page 53 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Fixture Type Quantity
SWAT Command/ GIT 250w High Pressure Sodium 5
SWAT Command/ GIT Fluorescent, (6) 48", T-8 lamps, (2) IS Ballasts, NLO (0.85 < BF < 0.95)
5 SWAT Command/ GIT Incandescent, (1) 120W lamp 7
Weston Park - Shuffle Board LED Luminaire 9
Weston Park - Shuffle Board Low-Pressure Sodium, S68, 50w 1 Total 1,040

Page 60 of 1157 ends

15.F

Page 988 of 2163 ends

© 2020 Centrica Business Solutions

Page 54 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

RECOMMENDATION
Centrica recommends replacing fixtures/ lamps identified in Table 16 with an LED solution. All fixtures and retrofit kits shall be Design Lights Consortium (DLC) approved. Motion sensors and lighting controls shall be installed where required to comply with CA Title 24 energy code.

The existing fixtures, lamps, and ballasts, as well as any metal and cardboard will be recycled. Centrica will be responsible for disposal and recycling of existing lighting fixtures. Centrica will provide all necessary aerial equipment for safe and proper replacement of the light fixtures in accordance with Cal/OSHA and local codes and ordinances.

Table 17 provides a summary of the proposed lighting upgrades by fixture type. Detailed line-by-line summary of the lighting upgrades and locations are represented in Appendix B. Cut sheets for the materials described in Table 17 are provided in Appendix C.

Table 17 – Lighting Fixture Upgrades Summary
Fixture Upgrade Description Quantity
LED Strip Retrokit 4' 2
LED Strip Retrokit 8' 3
N/A - Existing LED 154
New Area Light 94
New Exit Sign 1
New Flood 45
New HID High Bay 5
New LED Wrap 24
New Wall Pack 37
No Action 22
Rebuild 536
Relamp 84
Remove 1
Retro Kit Can to LED 36
Total 1,044

SAVINGS SUMMARY
Savings for lighting measures are based on two components:
• Energy savings associated with a reduction in lamp/fixture power • Reduction in operating costs associated with the increased life of new LED lighting.

For each site, the lighting energy savings for retrofits are based on the following calculation:

Page 61 of 1157 ends

15.F

Page 989 of 2163 ends

© 2020 Centrica Business Solutions

Page 55 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Energy Savings (kWh/yr) = (kWbefore - kWafter) × Operating Hours Retrofit strategies are developed and the calculations are repeated for the proposed or post-retrofit configuration. Further, the installation of occupancy sensor control is anticipated to reduce annual hours of operation in those spaces where the sensors are installed. While savings from occupancy sensors are expected, savings associated with a reduction in operating hours have not been estimated for this FIM.

The annual operating cost savings are based on the replacement costs for ballasts and lamps as shown in the following calculation. Note that no labor savings are included, only material replacement costs.

The replacement cost savings are shown in Table 18 using the equation below.

Replacement Cost Savings = Quantity × Unit Annual Cost per Item Table 18 – Lighting Lamp and Ballast Material Cost Savings Components
Avg
Annual
Run
Hours
Avg
Rated
Lamp Life
(hours)
Avg
Rated
Ballast
Life
(hours)
Lamp
Qty
Ballast
Qty
Annual
Lamp
Cost
Annual
Ballast
Cost
Total
Annual
Line Item
Cost
Compact
Fluorescent
Lamp (CFL) and
Ballast
3,119 9,789 2,632 125 3 $253 $2 $255
HID Lamp and
Ballast
4,317 58,667 42,899 676 666 $719 $1,021 $1,740
Incandescent
Lamp
3,653 3,000 - 62 - $272 $- $272
T-8 Fluorescent
Lamp and
Ballast
1,703 36,000 100,000 46 15 $11 $5 $17
Existing LED 4,436 10,513 - 154 - $- $- $-
TOTAL 1,063 684 $1,255 $1,028 $2,284

Page 62 of 1157 ends

15.F

Page 990 of 2163 ends

© 2020 Centrica Business Solutions

Page 56 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

BASELINE USAGE AND COST
Energy baseline for this FIM is defined as existing annual electric energy usage and lamp/ballast replacement costs for lighting at these facilities as shown in Table 19 below.

Table 19 – FIM #2 Baseline Usage and Costs
Building
Electrical
Consumption
(kWh/yr)
Electrical
Annual Cost
(per year)
Lamp/Ballast
Annual
Replacement
Cost
(per year)
Total
Annual
Cost
(per year)
Brubaker Park 5,554 $1,259 $49 $1,308
City Hall 14,450 $2,456 $151 $2,607
City Hall Overflow Parking 5,168 $977 $42 $1,018
City Yard 39,941 $8,601 $223 $8,823
Fire Station 2 1,007 $184 $4 $188
Fire Station 4 12,549 $2,139 $145 $2,284
Gang Task Force 1,472 $281 $20 $300
Gibbel Park - Lawn Bowling 13,626 $2,465 $47 $2,511
Library 26,604 $4,708 $329 $5,036
LLMD 129,035 $26,556 $753 $27,309
Mary Henley Park 5,782 $1,019 $17 $1,036
PACT 1,708 $331 $27 $357
Police, Fire Station 1, Council Chambers 12,058 $1,758 $170 $1,928 Salon 7,840 $4,245 $38 $4,282
Shooting Range 3,182 $664 $31 $695
Simpson Center 8,786 $1,962 $129 $2,091
Simpson Park 102 $24 $2 $26
SWAT Command/ GIT 14,861 $2,617 $107 $2,724
Weston Park - Shuffleboard 1,226 $238 $2 $239
TOTAL 304,951 $62,484 $2,286 $64,762

POST RETROFIT ENERGY USE AND COST
Projected energy use and cost for this FIM are shown in Table 20 below.

Table 20 – FIM #2 Post Retrofit Energy Usage and Costs

Page 63 of 1157 ends

15.F

Page 991 of 2163 ends

© 2020 Centrica Business Solutions

Page 57 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Building
Electrical
Consumption
(kWh/yr)
Electrical
Annual Cost
(per year)
Lamp/Ballast
Annual
Replacement Cost
(per year)
Total
Annual Cost
(per year)
Brubaker Park 2,418 $548 $- $548
City Hall 3,828 $651 $- $651
City Hall Overflow Parking 2,330 $440 $- $440
City Yard 35,786 $7,706 $- $7,706
Fire Station 2 596 $109 $- $109
Fire Station 4 4,284 $730 $- $730
Gang Task Force 569 $109 $- $109
Gibbel Park - Lawn Bowling 17,874 $3,233 $- $3,233
Library 13,293 $2,352 $- $2,352
LLMD 73,120 $15,049 $- $15,049
Mary Henley Park 4,271 $752 $- $752
PACT 604 $117 $- $117
Police, Fire Station 1, Council
Chambers
5,038 $735 $- $735
Salon 2,177 $1,179 $- $1,179
Shooting Range 825 $172 $- $172
Simpson Center 3,705 $827 $- $827
Simpson Park 43 $10 $- $10
SWAT Command/ GIT 3,351 $590 $- $590
Weston Park - Shuffleboard 1,104 $214 $- $214
TOTAL 175,216 $35,523 $- $35,523

ENERGY AND COST SAVINGS
Savings is difference between Baseline and Post Retrofit energy usage and cost savings as summarized in Table 21. A 10% reduction is applied to consumption and cost savings to account for Centrica’s guarantee.

Table 21 – FIM #2 Energy and Cost Savings

Page 64 of 1157 ends

15.F

Page 992 of 2163 ends

© 2020 Centrica Business Solutions

Page 58 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Building
Electric
Consumption
Savings
(kWh/yr)
Electrical Cost
Savings
(per year)
Replacement
Cost Savings
(per year)
Total
Annual Cost
Savings
(per year)
Brubaker Park 3,136 $640 $49 $689
City Hall 10,622 $1,625 $151 $1,776
City Hall Overflow Parking 2,838 $483 $42 $524
City Yard 4,155 $805 $223 $1,028
Fire Station 2 412 $68 $4 $72
Fire Station 4 8,265 $1,268 $145 $1,413
Gang Task Force 902 $155 $20 $175
Gibbel Park - Lawn Bowling (4,248) $(691) $47 $(644)
Library 13,311 $2,120 $329 $2,449
LLMD 55,915 $8,980 $753 $9,733
Mary Henley Park 1,511 $240 $17 $256
PACT 1,104 $192 $27 $219
Police, Fire Station 1, Council
Chambers
7,020 $921 $170 $1,091
Salon 5,663 $2,759 $38 $2,797
Shooting Range 2,357 $- $31 $31
Simpson Center 5,081 $1,021 $129 $1,150
Simpson Park 60 $13 $2 $14
SWAT Command/ GIT 11,511 $1,824 $107 $1,931
Weston Park - Shuffleboard 123 $21 $2 $22
TOTAL 129,738 $22,444 $2,286 $24,726

Page 65 of 1157 ends

15.F

Page 993 of 2163 ends

© 2020 Centrica Business Solutions

Page 59 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.3 FIM #3: ADVANCED LIGHTING CONTROLS
Annual Cost Savings Implementation Cost Incentive/Rebate $0 $43,125 $0

FACILITIES AFFECTED
This FIM will be completed at the following sites:
• Library

OBSERVATIONS
A detailed audit of existing advanced lighting controls was conducted at library. Library is equipped with 2 advanced lighting control panels: one located in downstairs electrical room and second located in upstairs electrical room. Downstairs panel is a WattStopper ACPNET 32120. Panel upstairs is a subpanel HPSM 115/277. System is currently not functional and lighting in library is controlled manually via override.

RECOMMENDATION
Centrica recommends replacing existing advanced lighting controls with new Lutron based system.

Panels in both upstairs and downstairs will be replaced with Lutron XPS36-1204ML-20. All low voltage wiring to power packs, bridges, switches, etc. will be replaced or installed as necessary.

New lighting control system will enable scheduling of all luminaires controlled by previous advanced lighting control system. New system will not add or expand control zones; it will restore full scheduling functionality to library.

SAVINGS SUMMARY
Savings for this FIM are associated with energy conservation related to reducing operating hours during unoccupied times for controlled areas.

Although Centrica believes this measure will yield some electric savings through reduced operating hours, we did not claim any energy savings for the measure. City of Hemet already operates system efficiently by only keeping lights on when occupied. However, a working advanced lighting control system would ease burden of labor on maintenance staff to manually operate lighting efficiently.

Page 66 of 1157 ends

15.F

Page 994 of 2163 ends

© 2020 Centrica Business Solutions

Page 60 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.4 FIM #4: HVAC UNIT REPLACEMENTS
Annual Cost Savings Implementation Cost Incentive/Rebate $13,289 $800,213 $0

FACILITIES AFFECTED
This FIM will be completed at the following sites:
• City Hall
• City Yard
• Gang Task Force
• Police, Fire Station 1, Council Chambers
• Simpson Center
• Fire Station 2
• Fire Station 4
• Brubaker Park
• Weston Park - Shuffleboard
A savings summary for the affected sites is provided in Table 22.

Table 22 – HVAC Savings Summary by Site
Facility Name Annual Utility Savings Operational Savings Total Annual Cost (per yr) (per yr) Savings
City Hall $709 $2,337 $3,046
City Yard $242 $377 $619
Gang Task Force $149 $221 $369
Police, Fire Station 1,
Council Chambers
$1,421 $2,754 $4,175
Simpson Center $1,478 $1,074 $2,552
Fire Station 2 $19 $235 $254
Fire Station 4 $642 $698 $1,339
Brubaker Park $0 $0 $0
Weston Park - Shuffle
Board
$180 $754 $934
Total $4,839 $8,449 $13,289

OBSERVATION
The City has a mixture of rooftop packaged units and split systems that Centrica considers to be reasonable to replace. See the table below for an inventory of units included in Centrica’s

Page 67 of 1157 ends

15.F

Page 995 of 2163 ends

© 2020 Centrica Business Solutions

Page 61 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
recommendation. The current units at the sites are not operating as efficiently as possible, primarily due to outdated technology, and deterioration over time. As such, the replacement of the HVAC units will improve energy usage efficiency as well as operational savings.

Table 23 – Existing HVAC Unit Inventory
Site Equipment Type Make Model Cooling
Capacity (tons)
Brubaker Park Evaporative Cooler Unknown Unknown -
City Hall Gas/ Electric Split
System CARRIER 38HDC036-321 3
City Hall Gas/ Electric Split
System CARRIER 38HDR060-301 5
City Hall Gas/ Electric
Packaged Unit CARRIER 48HJD008---541-- 7.5
City Hall Gas/ Electric
Packaged Unit CARRIER 48HJD008---541-- 7.5
City Hall Gas/ Electric
Packaged Unit CARRIER 48HJD008---541-- 7.5
City Hall Gas/ Electric
Packaged Unit CARRIER 48HJD008---541-- 7.5
City Hall Gas/ Electric
Packaged Unit CARRIER 48HJD012---571-- 10
Fire Station 2 Gas/ Electric Split
System CARRIER 38BRC048370 4
Fire Station 4 Gas/ Electric Split
System CARRIER 38YKC030320 2.5
Fire Station 4 Gas/ Electric
Packaged Unit CARRIER 48HJM006---541-- 5
Fire Station 4 Gas/ Electric
Packaged Unit CARRIER 48HJM006---541-- 5
Fire Station 4 Gas/ Electric
Packaged Unit CARRIER 48HJM004---541-- 3
Gang Task Force Gas/ Electric
Packaged Unit CARRIER 48GXN024040301-- 2
Gang Task Force Gas/ Electric
Packaged Unit CARRIER 48GXN0420060301-- 3.5
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit CARRIER 48HJD008---641-- 7.5
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit LENNOX LGA088HS2G 7.5
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit CARRIER 48HJL006---641-- 5

Page 68 of 1157 ends

15.F

Page 996 of 2163 ends

© 2020 Centrica Business Solutions

Page 62 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Site Equipment Type Make Model Cooling
Capacity (tons)
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit CARRIER 48HJM004---641-- 3
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit CARRIER 48HJD008---641-- 7.5
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit CARRIER 48HJL006---641-- 5
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit CARRIER 38HD060C500 5
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit ICP CAC036HAA/ACC036HAA 3
PD, FS1, Council
Chambers
Gas/ Electric
Packaged Unit CARRIER 48HJD008---641-- 7.5
PD, FS1, Council
Chambers Split System UT CARRIER 38HD060C500 5
Public Works Yard Gas/ Electric
Packaged Unit CARRIER 48HJD005---621-- 4
Public Works Yard Gas/ Electric
Packaged Unit CARRIER 48HJD005---621-- 4
Simpson Center Gas/ Electric
Packaged Unit CARRIER 48HJL006---541-- 5
Simpson Center Gas/ Electric
Packaged Unit LENNOX LGA300SS1G 25
Simpson Center Split System Heat
Pump CARRIER 38TH048610DL 4
Simpson Center Split System Heat
Pump CARRIER 38TH024300 2
Weston Park Packaged Heat
Pump Lennox CHA16-511-6P 4
Weston Park Packaged Heat
Pump Lennox CHA16-511-6P 4
Weston Park Packaged Heat
Pump Lennox CHA16-511-6P 4
Weston Park Packaged Heat
Pump Lennox CHA16-511-6P 4
Total 189

RECOMMENDATION
Centrica recommends replacing forty-two (34) HVAC units that consist of one (1) evaporative cooler at Brubaker Park, sixteen (7) split system units and twenty-five (27) packaged units throughout the city.

Existing units in Table 23 have a minimum age of 15 years and are showing signs of significate

Page 69 of 1157 ends

15.F

Page 997 of 2163 ends

© 2020 Centrica Business Solutions

Page 63 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
degradation. The new units contain environmentally safe refrigerant, are easy to install, and are more efficient than the current installed systems.

The current specification is to replace all units ton-for-ton with new Carrier equipment. Where needed, curb adapters will be installed to ensure a matching fit to the existing duct work. Low-leak economizers and factory installed VFD controllers shall be included where required by CA Title 24. Data sheets for the new RTUs are provided in Appendix C.

SAVINGS SUMMARY
Cost savings can be obtained from both energy savings and maintenance savings by replacing these older units with new units. Energy savings is based upon the improved operating efficiencies of the new equipment and has been determined using ASHRAE standard comparison calculations for climatic conditions. As HVAC equipment ages, performance levels decrease due to general wear of motors, compressors, heat exchangers, actuators, and linkages. In our energy calculations, we have assumed that the base level performance has decreased for the existing units.

Energy Savings (kWh/yr) = Existing Usage – Proposed Usage Usage (Cooling kWh) = Clg Tonnage x 12,000 (Btuh/ton) x EFLCH ÷1,000 (W/kW) ÷ Existing EER Usage (Heating therms) = Htg Capacity (Btu/h) x EFLHH ÷100,000 (Btu/h/therm) ÷ Htg Efficiency (%) Maintenance savings are based on annual R-22 refrigerant loss and cost per pound for annual recharging. R-22 refrigerant is no longer being manufacturer in the United States and continues to increase in price every year.

Table 24 – FIM #4 Annual Refrigerant Usage
Site Total Refr Charge (lbs) Annual Refr Charge (lbs) Annual Refr Cost
City Hall 104 26 $2,337
City Yard 17 4 $377
Gang Task Force 10 3 $221
Police, Fire Station 1, Council
Chambers 122 31 $2,754
Simpson Center 48 12 $1,074
Fire Station 2 10 3 $235
Fire Station 4 31 8 $698
Brubaker Park 0 0 $0
Weston Park - Shuffleboard 34 8 $754
Total 376 95 $8,450

BASELINE USAGE AND COST

Page 70 of 1157 ends

15.F

Page 998 of 2163 ends

© 2020 Centrica Business Solutions

Page 64 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
The energy baseline for this FIM is defined as the existing annual electric energy usage and natural gas costs at these facilities as shown in the table below.

Table 25 – FIM #4 Baseline Usage and Costs
Location
Baseline
Electric
Consumption
Baseline
Annual
Baseline Gas
Consumption
Baseline
Gas Cost Baseline
Maintenance
Cost
Total
Annual
(kWh/yr) Cost
Electrical
kWh Cost (therm/yr) (per year)
(per year)
City Hall 37,185 $6,320 1104 $1,224 $2,337 $9,881
City Yard 6,464 $1,392 256 $224 $377 $1,993
Gang Task
Force 4,565 $870 134 $157 $221 $1,248
Police, Fire
Station 1,
Council
Chambers
49,868 $7,270 1107 $1,059 $2,754 $11,084
Simpson
Center 20,824 $4,650 108 $126 $1,074 $5,850
Fire Station
2 3,219 $588 0 $0 $235 $823
Fire Station
4 12,555 $2,140 392 $457 $698 $3,295
Brubaker
Park 0 $0 0 $0 $0 $0
Weston
ParkShuffleboard3,211 $601 0 $0 $754 $1,355
Total 137,891 $23,831 3,101 $3,247 $8,450 $35,529

POST RETROFIT ENERGY USE AND COST
The projected energy use and cost for these measures are shown in the table below.

Table 26 – FIM #4 Post Retrofit Energy Usage and Costs
Location
Proposed
Electric
Consumption
Proposed
Annual
Proposed
Gas
Consumption
Proposed
Gas Cost Proposed
Maintenance
Cost
Proposed
Total
Annual
Cost (kWh/yr) Electrical
kWh Cost (therm/yr) (per year)
(per year)
City Hall 33,841 $5,752 977 $1,083 $0 $6,835
City Yard 5,539 $1,193 207 $181 $0 $1,374

Page 71 of 1157 ends

15.F

Page 999 of 2163 ends

© 2020 Centrica Business Solutions

Page 65 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Location
Proposed
Electric
Consumption
Proposed
Annual
Proposed
Gas
Consumption
Proposed
Gas Cost Proposed
Maintenance
Cost
Proposed
Total
Annual
Cost (kWh/yr) Electrical
kWh Cost (therm/yr) (per year)
(per year)
Gang Task
Force 3,712 $708 146 $171 $0 $879
Police, Fire
Station 1,
Council
Chambers
41,493 $6,049 899 $860 $0 $6,909
Simpson
Center 15,014 $3,352 77 $90 $0 $3,442
Fire Station
2 3,114 $569 0 $0 $0 $569
Fire Station
4 8,914 $1,520 374 $436 $0 $1,956
Brubaker
Park 0 $0 0 $0 $0 $0
Weston
ParkShuffleboard2,247 $421 0 $0 $0 $421
Total 113,874 $19,564 2,680 $2,821 $0 $22,385

ENERGY AND COST SAVINGS
The energy savings are the difference between the Baseline and the Post Retrofit energy use and cost as summarized in the table below. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 27 – FIM #4 Energy and Cost Savings
Location
Electric
Consumption
Savings
Annual
Gas
Consumption
Savings
Gas Cost
Savings Maintenance
Savings (per
Year)
Total
Annual
Cost
(kWh/yr) Savings
Electrical
kWh Cost
Savings
(therm/yr) (per year)
City Hall 3,344 $568 127 $141 $2,337 $3,046
City Yard 924 $199 49 $43 $377 $619
Gang Task
Force 853 $163 -12 ($14) $221 $369
Police, Fire
Station 1, 8,375 $1,221 209 $200 $2,754 $4,175

Page 72 of 1157 ends

15.F

Page 1000 of 2163 ends

© 2020 Centrica Business Solutions

Page 66 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Location
Electric
Consumption
Savings
Annual
Gas
Consumption
Savings
Gas Cost
Savings Maintenance
Savings (per
Year)
Total
Annual
Cost
(kWh/yr) Savings
Electrical
kWh Cost
Savings
(therm/yr) (per year)
Council
Chambers
Simpson
Center 5,810 $1,297 155 $180 $1,074 $2,552
Fire Station
2 104 $19 0 $0 $235 $254
Fire Station
4 3,641 $621 18 $21 $698 $1,339
Brubaker
Park 0 $0 0 $0 $0 $0
Weston Park
-
Shuffleboard
963 $180 0 $0 $754 $934
Total 24,014 $4,268 546 $571 $8,450 $13,288

Page 73 of 1157 ends

15.F

Page 1001 of 2163 ends

© 2020 Centrica Business Solutions

Page 67 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.5 FIM #5: CHILLED WATER SYSTEM UPGRADES
Annual Cost Savings Implementation Cost Incentive/Rebate $14,075 $445,902 $4,000

FACILITIES AFFECTED
This FIM will be completed at the following site:
• Library

OBSERVATION
Cooling is provided to Library via (56) fan coil units (FCUs). Each FCU contains a chilled water coil controlled with a 3-way valve and digital actuator. A single water-cooled, 130-ton screw chiller produces chilled water to be distributed to the building via (2) 10 horsepower chilled water pumps. The (2) chilled water pumps operate in a lead-lag configuration, meaning only one is running at any given time. The pumps operate at constant speed during cooling season and are off during heating. Heat rejection from the chiller is provided by an EVAPCO cooling tower. The cooling tower has a single constant speed 10 horsepower fan motor, and condenser water is circulated via a 2-horsepower constant speed pump.

The cooling system at Library was installed in 2004 and is showing numerous issues. Issues identified during the site walk are provided in the list below:
• Cooling tower is leaking. Visible rust in the basin was detected and significant deterioration of media was observed.
• The chiller has issues with compressor stages failing. Maintenance is fixing this as needed. • Chiller controls are operated manually, not according to sequence of operations. • Chilled water pumps operate at constant speed.

RECOMMENDATION
Centrica recommends demolishing existing EVAPCO enclosure which houses the chiller, cooling tower, and chilled water pumps/motors. Maintenance staff have shown concern over the amount of repair work needed for water-cooled system which has driven our decision to propose an air-cooled chiller with similar nominal cooling capacity. Air cooled chiller will eliminate the need for water treatment and will save additional maintenance by not having condenser water pump and cooling tower fans.

Centrica also recommends converting the existing chilled water loop to variable flow. The Existing chilled water pumps and motors will be replaced in kind and variable frequency drives will be installed on new inverter-duty motors. A chilled water bypass loop will be installed to accommodate excess flow.

All chilled water valves in FCUs shall be replaced with two-way valves.

SAVINGS SUMMARY
Cost savings can be obtained from the energy savings associated with upgrading existing chiller to a new Title 24 complaint air-cooled chiller. Additional energy saving will also be added due to the elimination of the condenser water pump and cooling tower fans that are needed for water-cooled chillers. Energy

Page 74 of 1157 ends

15.F

Page 1002 of 2163 ends

© 2020 Centrica Business Solutions

Page 68 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
savings is based upon the improved operating efficiencies of the new equipment and has been determined using ASHRAE standard comparison calculations for climatic conditions. As HVAC equipment ages, performance levels decrease due to general wear of motors, compressors, plumbing, heat exchangers. In our energy calculations, we have assumed that the base level performance has decreased for the existing chiller.

Energy savings associated with an increase in chiller efficiency are calculated as follows for each chiller in the scope of work:

𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 �
𝑘𝑘𝑘𝑘ℎ
� = 𝐶𝐶𝐶𝐶 𝐶𝐶 𝑈𝑈 − 𝑃𝑃 𝑃𝑃𝑃𝑃𝑃𝑃 𝑃𝑃 𝑈𝑈
𝐶𝐶𝐶𝐶 𝐶𝐶 𝑈𝑈 �
𝑘𝑘𝑘𝑘ℎ
�
= 𝐶𝐶 𝐶𝐶 𝑇𝑇 𝑥𝑥 12,000
𝐵𝐵 ℎ
𝑥𝑥 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸
1𝑘𝑘𝑘𝑘
1,000 𝑥𝑥 𝐸𝐸 𝐸𝐸𝐸𝐸 𝐶𝐶ℎ 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸 𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 (
𝑘𝑘𝑘𝑘
)
𝑃𝑃 𝑃𝑃𝑃𝑃𝑃𝑃 𝑃𝑃 𝑈𝑈 �
𝑘𝑘𝑘𝑘ℎ
�
= 𝐶𝐶 𝐶𝐶 𝑇𝑇 𝑥𝑥 12,000
𝐵𝐵 ℎ
𝑥𝑥 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸
1𝑘𝑘𝑘𝑘
1,000 𝑥𝑥 𝑃𝑃 𝑃𝑃𝑃𝑃𝑃𝑃 𝑃𝑃 𝐶𝐶ℎ 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸 𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 (
𝑘𝑘𝑘𝑘
)
Where,
EFLCH = Equivalent Full Load Cooling Hours
Energy savings for chilled water loop variable frequency drives were based on a motor load profile and pump laws in which the power of the motor decreases as a cubic function of the speed. A factor of 2.5 was used rather than 3 to ensure the savings estimates are conservative. The minimum VFD speed is limited at 40% to ensure minimum flowrates are maintained through the chillers. The calculations are provided in Appendix B utilizing a BIN temperature analysis as described below:

𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 �
𝑘𝑘𝑘𝑘ℎ
� = 𝐶𝐶𝐶𝐶 𝐶𝐶 𝑈𝑈 − 𝑃𝑃 𝑃𝑃𝑃𝑃𝑃𝑃 𝑃𝑃 𝑈𝑈
𝐶𝐶𝐶𝐶 𝐶𝐶 𝑈𝑈 = � 𝐼𝐼 𝑃𝑃𝑃𝑃𝑃𝑃 (𝑘𝑘𝑘𝑘)𝑥𝑥 𝐵𝐵
𝑏𝑏𝑏𝑏𝑏𝑏 ℎ𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜
𝑃𝑃 𝑃𝑃𝑃𝑃𝑃𝑃 𝑃𝑃 𝑈𝑈 = � 𝐼𝐼 𝑃𝑃𝑃𝑃𝑃𝑃 (𝑘𝑘𝑘𝑘)𝑥𝑥 𝑉𝑉 𝑉𝑉 %𝑝𝑝𝑝𝑝 𝑏𝑏𝑏𝑏𝑏𝑏

2.5 𝑥𝑥 𝐵𝐵
𝑉𝑉 𝑉𝑉 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸 𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 𝑏𝑏𝑏𝑏𝑏𝑏 ℎ𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜

Page 75 of 1157 ends

15.F

Page 1003 of 2163 ends

© 2020 Centrica Business Solutions

Page 69 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

BASELINE USAGE AND COST
The energy baseline for this FIM is defined as the existing annual electric energy usage and natural gas costs at these facilities as shown in the table below.

Table 28 – FIM #4 Baseline Usage and Costs
Location Baseline Electricity
Consumption (kWh/yr)
Baseline kWh Cost
(per year) Total Annual Cost
Library - Chiller
Replacement 181,463 $32,110 $32,110
Library - Chilled Water
Loop VFD 21,237 $3,758 $3,758
Total 202,700 $35,868 $35,868

POST RETROFIT ENERGY USE AND COST
The projected energy use and cost for these measures are shown in the table below.

Table 29 – FIM #4 Post Retrofit Energy Usage and Costs
Location Proposed Electricity
Consumption (kWh/yr)
Proposed kWh Cost
(per year)
Proposed Total Annual
Cost
Library - Chiller
Replacement 109,117 $19,308 $19,308
Library - Chilled Water
Loop VFD 5,204 $921 $921
Total 114,321 $20,229 $20,229

ENERGY AND COST SAVINGS
The energy savings are the difference between the Baseline and the Post Retrofit energy use and cost as summarized in the table below. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 30 – FIM #4 Energy and Cost Savings
Location Electricity Consumption
Savings (kWh/yr)
kWh Cost Savings (per
year)
Total Annual Cost
Savings
Library - Chiller
Replacement 65,111 $11,522 $11,522
Library - Chilled Water
Loop VFD 14,430 $2,553 $2,553
Total 79,541 $14,075 $14,075

Page 76 of 1157 ends

15.F

Page 1004 of 2163 ends

© 2020 Centrica Business Solutions

Page 70 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.6 FIM #6: HOT WATER SYSTEM UPGRADES
Annual Cost Savings Implementation Cost Incentive/Rebate $1,105 $268,132 $749

FACILITIES AFFECTED
This FIM will be completed at the following sites:
• Library

OBSERVATION
Heating is provided to Library via (56) fan coil units (FCUs). Each FCU contains a hot water coil controlled with a 3-way valve and digital actuator. Two 830 MBH hot water boilers produce hot water to be distributed to the building via (2) 5 horsepower hot water pumps. The (2) hot water boilers operate in a lead-lag configuration; however, one boiler is inoperable. The pumps operate at constant speed during heating season and are off during cooling.

RECOMMENDATION
Centrica recommends replacing both hot water boilers with matching Raypak hot water boilers due to ongoing maintenance issues and faulty equipment. Centrica also recommends converting the existing hot water loop to variable flow. The Existing hot water pumps and motors will be replaced in kind and variable frequency drives will be installed on new inverter-duty motors. Hot water valves in FCUs shall be replaced with two-way valves.

SAVINGS SUMMARY
The energy savings for this measure are achieved by decreasing the pump speed using Variable Frequency Drives (VFDs). Variable frequency drives (VFD’s) will be installed on the two 5 horsepower pumps that feed the chilled water loop. The use of a variable speed drive will allow the pumps to modulate speed depending on system load. Energy savings are associated with a reduction in the power consumed by the pumps. Savings for the installation of VFDs were calculated using a spreadsheet model.

Energy savings were based on a motor load profile and pump laws in which the power of the motor decreases as a cubic function of the speed. A factor of 2.5 was used rather than 3 to ensure the savings estimates are conservative. The minimum VFD speed is limited at 40% to ensure minimum flowrates are maintained through the chillers. The calculations are provided in Appendix B utilizing a BIN temperature analysis as described below:

𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 �
𝑘𝑘𝑘𝑘ℎ
� = 𝐶𝐶𝐶𝐶 𝐶𝐶 𝑈𝑈 − 𝑃𝑃 𝑃𝑃𝑃𝑃𝑃𝑃 𝑈𝑈

Page 77 of 1157 ends

15.F

Page 1005 of 2163 ends

© 2020 Centrica Business Solutions

Page 71 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
𝐶𝐶𝐶𝐶 𝐶𝐶 𝑈𝑈 = � 𝐼𝐼 𝑃𝑃𝑃𝑃𝑃𝑃 (𝑘𝑘𝑘𝑘)𝑥𝑥 𝐵𝐵
𝑏𝑏𝑏𝑏𝑏𝑏 ℎ𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜
𝑃𝑃 𝑃𝑃𝑃𝑃𝑃𝑃 𝑃𝑃 𝑈𝑈 = � 𝐼𝐼 𝑃𝑃𝑃𝑃𝑃𝑃 (𝑘𝑘𝑘𝑘)𝑥𝑥 𝑉𝑉 𝑉𝑉 %𝑝𝑝𝑝𝑝 𝑏𝑏𝑏𝑏𝑏𝑏

2.5 𝑥𝑥 𝐵𝐵
𝑉𝑉 𝑉𝑉 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸
𝑏𝑏𝑏𝑏𝑏𝑏 ℎ𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜

BASELINE USAGE AND COST
The energy baseline for this FIM is defined as the existing annual electric energy usage and natural gas costs at these facilities as shown in the table below.

Table 31 – FIM #6 Baseline Usage and Costs
Location Baseline Electricity
Consumption (kWh/yr)
Baseline kWh Cost
(per year) Total Annual Cost
Library - Boiler
Replacement - $0 $0
Library - Hot Water
Loop VFD 8,740 $1,547 $1,547
Total 8,740 $1,547 $1,547

POST RETROFIT ENERGY USE AND COST
The projected energy use and cost for these measures are shown in the table below.

Table 32 – FIM #6 Post Retrofit Energy Usage and Costs
Location Proposed Electricity
Consumption (kWh/yr)
Proposed kWh Cost
(per year)
Proposed Total Annual
Cost
Library - Boiler
Replacement - $0 $0
Library - Hot Water
Loop VFD 1,798 $318 $318
Total 1,798 $318 $318

Page 78 of 1157 ends

15.F

Page 1006 of 2163 ends

© 2020 Centrica Business Solutions

Page 72 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

ENERGY AND COST SAVINGS
The energy savings are the difference between the Baseline and the Post Retrofit energy use and cost as summarized in the table below. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 33 – FIM #6 Energy and Cost Savings
Location Electricity Consumption
Savings (kWh/yr)
kWh Cost Savings (per
year)
Total Annual Cost
Savings
Library - Boiler
Replacement - $0 $0
Library - Hot Water
Loop VFD 6,247 $1,105 $1,105
Total 6,247 $1,105 $1,105

Page 79 of 1157 ends

15.F

Page 1007 of 2163 ends

© 2020 Centrica Business Solutions

Page 73 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.7 FIM #7: BUILDING MANAGEMENT SYSTEM REPLACEMENT
Annual Cost Savings Implementation Cost Incentive/Rebate $13,420 $338,489 $0

FACILITIES AFFECTED
This FIM will be completed at the following sites:
• Library

OBSERVATION
During Centrica’s site audit, we were made aware that the Tracer Summit building management controls systems for the central plant HVAC system was inoperable and needs immediate attention. The system is meant to control all aspects of the HVAC system which include the chiller, hot wate broiler, pumps, Fan Coil Units (FCUs), rooftop make-up air units, exhaust fans, etc. The controls system is also supposed to provide centralized access to monitor the system with ease. At this time, the maintenance staff does not have the ability to use Tracer Summit for it intended purpose and must manually adjust the components of the overall system at induvial points. This includes all fifty-two FCUs throughout the entire facility.

RECOMMENDATION
Centrica recommends replacing all direct digital controls components, software and programming including control panels / backplates, controllers, transformers, sensors (duct temperature, motor current, room temperature, outside air temperature, etc.), transmitters, actuators, control valves and relays. This will allow maintenance staff and library works to easily adjust system for comfort during occupancy and reducing runtime during unoccupied hours. Below is a list of IO points that will gain control after switching to new BMS controls.

Makeup Air Units IO Points (Typ. for 2):

Analog Input Exhaust Fan Load
Analog Input Outside Air Temp and Humidity
Analog Input Return Air Temperature
Analog Input Supply Air Temperature
Analog Input Supply Fan Load
Digital Input Filter Status
Analog Output Circulating Air Dampers
Analog Output Exhaust Bypass Dampers
Analog Output Exhaust Dampers
Analog Output Outside Air Damper1

Page 80 of 1157 ends

15.F

Page 1008 of 2163 ends

© 2020 Centrica Business Solutions

Page 74 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Analog Output Outside Air Damper2
Digital Output Energy Wheel Request Enable
Digital Output Exhaust Request Enable
Digital Output Supply Fan Command
Digital Output Supply Fan Request Enable
Heating System IO Points
Analog Input Boiler 1 Circ Pump 1 Load
Analog Input Boiler 2 Circ Pump 2 Load
Analog Input Hot Water Return Temp
Analog Input Hot Water Supply Temp
Analog Input Loop Pump 1 Load
Analog Input Loop Pump 2 Load
Digital Input HW Boiler 1 Alarm
Digital Input HW Boiler 1 Run Status
Digital Input HW Boiler 2 Alarm
Digital Input HW Boiler 2 Run Status
Digital Input VFD 1 Alarm
Digital Input VFD 1 Fault
Digital Input VFD 2 Alarm
Digital Input VFD 2 Fault
Analog Output Boiler-1 Setpoint
Analog Output Boiler-2 Setpoint
Analog Output Pump 1 VFD Speed
Analog Output Pump 2 VFD Speed
Digital Output Boiler 1 Circ Pump Command
Digital Output Boiler 2 Circ Pump Command
Digital Output Boiler Plant Fail Reset
Digital Output HW Pump 1 (Loop)Command

Page 81 of 1157 ends

15.F

Page 1009 of 2163 ends

© 2020 Centrica Business Solutions

Page 75 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Digital Output HW Pump 2 (Loop)Command
Chilled Water System IO Points
Analog Input Chilled Water Pump 1 Load
Analog Input Chilled Water Pump 2 Load
Analog Input Chiller 1 General Alarm
Analog Input Chiller 1 Return Temp
Analog Input Chiller 1 Supply Temp
Analog Input Return Loop DP (tie into DDC controller in the Space) Analog Input Supply Loop DP (tie into DDC controller in the Space) Digital Input Chiller 1 Alarm
Digital Input Chiller 1 Alert
Digital Input Chiller 1 Isolation Valve Status (O/C)
Digital Input DX Stage 1 Status
Digital Input DX Stage 2 Status
Digital Input DX Stage 3 Status
Digital Input DX Stage 4 Status
Digital Input VFD 1 Alarm
Digital Input VFD 1 Fault
Digital Input VFD 2 Alarm
Digital Input VFD 2 Fault
Analog Output Chiller 1 Setpoint
Analog Output Pump 1 VFD Speed
Analog Output Pump 2 VFD Speed
Digital Output Chilled Water Pump 1 Command
Digital Output Chilled Water Pump 2 Command
Digital Output Chiller 1 Enable
Digital Output DX Stage 1 Command
Digital Output DX Stage 2 Command

Page 82 of 1157 ends

15.F

Page 1010 of 2163 ends

© 2020 Centrica Business Solutions

Page 76 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Digital Output DX Stage 3 Command
Digital Output DX Stage 4 Command
Four-pipe Fan Coil Units IO Points Typ. For 56
Analog Input Discharge Air Temperature
Analog Input Fan Load
Analog Input Room Temperature
Analog Input Set Point Adjust
Digital Input Timed Override
Analog Output Chilled Water Valve
Analog Output Fan Speed
Analog Output Hot Water Valve
Digital Output Fan Command

SAVINGS SUMMARY
Centrica has been made aware that the fan coil units at Public Library are manually set to run without any zone temperature or thermostat control.

A reduction of 3,650 runtime hours at each fan coil was made to match the occupied hours assessed at the Public Library.

Energy Usage = Motor HP x 0.746 kW/HP x Hours of Operation/Year x Part Load Factor / Motor Efficiency
Energy Savings (kWh/yr) = Existing Usage – Proposed Usage Electric Energy Cost ($) = Energy Usage x Electric Cost($/kWh) The desired cooling season temperature is below the current average building temperature. A correction to 74°F was used to determine savings associated with improved control through the BMS. A bin temperature analysis was performed based on the parameters, observed temperatures and the recommended changes summarized below
The following savings calculations are used for the temperature correction and setback at all the facilities. The same calculation will be used for cooling and heating. The “n” in the equation below represents the BIN for that specific calculation.

Page 83 of 1157 ends

15.F

Page 1011 of 2163 ends

© 2020 Centrica Business Solutions

Page 77 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
𝐴𝐴 $ 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 = 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 × $/𝑇𝑇ℎ 𝑒𝑒 𝑅𝑅
𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 (𝑇𝑇ℎ 𝑒𝑒 )
= [( + ) – (
+ )]/ (𝐵𝐵 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸 𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 × 1 𝑇𝑇ℎ 𝑒𝑒 /100 𝑀𝑀 )
= 𝐶𝐶 𝐶𝐶 𝐶𝐶 (𝑀𝑀 )
= ∑ [𝑈𝑈 × 𝐴𝐴 × (𝑇𝑇 ,𝑈𝑈 𝑈𝑈 – ) × 𝑈𝑈
/ 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
+ [𝑈𝑈 × 𝐴𝐴 × (𝑇𝑇 , – ) × / 1,000𝐵𝐵
/𝑀𝑀 ] “ ”
= 𝐼𝐼 (𝑀𝑀 )
= ∑ [𝐴𝐴 𝐼𝐼 & × 𝐴𝐴 × (( – 𝑇𝑇 , )
× )
+ ( – 𝑇𝑇 ,𝑈𝑈 ) × 𝑈𝑈 )) / 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
= 𝐶𝐶 𝐶𝐶 𝐶𝐶 (𝑀𝑀 )
= ∑ [𝑈𝑈 × 𝐴𝐴 × (𝑇𝑇 ,𝑈𝑈 𝑈𝑈 – ) × 𝑈𝑈
/ 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
+ [𝑈𝑈 × 𝐴𝐴 × (𝑇𝑇 , – ) × / 1,000𝐵𝐵
/𝑀𝑀 ] “ ”
= 𝐼𝐼 (𝑀𝑀 )
= ∑ [𝐴𝐴 𝐼𝐼 & × 𝐴𝐴 × (( – 𝑇𝑇 , )
× )
+ ( – 𝑇𝑇 ,𝑈𝑈 ) × 𝑈𝑈 )) / 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
𝐶𝐶 𝐶𝐶 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 (𝑘𝑘𝑘𝑘ℎ)
= [(𝐶𝐶𝐶𝐶 + 𝐶𝐶 )– (𝐶𝐶𝐶𝐶 𝐶𝐶 + 𝐶𝐶 𝐶𝐶)] × 𝐶𝐶ℎ 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸 𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 ÷ 1,000 𝐶𝐶𝐶𝐶 = 𝐶𝐶 𝐶𝐶 𝐶𝐶 𝐶𝐶 𝐶𝐶 (𝑀𝑀 )
= ∑ [𝑈𝑈 × 𝐴𝐴 × (
− 𝑇𝑇 𝐶𝐶 𝐶𝐶 ,𝑈𝑈 ) × 𝑈𝑈 / 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
+ [𝑈𝑈 × 𝐴𝐴 × (
− 𝑇𝑇 𝐶𝐶 𝐶𝐶 , ) × / 1,000𝐵𝐵 /𝑀𝑀 ] “ ”
𝐶𝐶 = 𝐶𝐶 𝐶𝐶 𝐼𝐼 (𝑀𝑀 )
= ∑ [𝐴𝐴 𝐼𝐼 & × 𝐴𝐴 × (( – 𝑇𝑇 𝐶𝐶 , )
× )/
+ ( – 𝑇𝑇 𝐶𝐶 𝐶𝐶 ,𝑈𝑈 ) × 𝑈𝑈 )/𝑈𝑈 ) / 1,000 𝐵𝐵
/𝑀𝑀 ] “ ”
𝐶𝐶𝐶𝐶 𝐶𝐶 = 𝐶𝐶 𝐶𝐶 𝐶𝐶 𝐶𝐶 𝐶𝐶 (𝑀𝑀 )
= ∑ [𝑈𝑈 × 𝐴𝐴 × (
− 𝑇𝑇 𝐶𝐶 𝐶𝐶 ,𝑈𝑈 𝑈𝑈 – ) × 𝑈𝑈 / 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
+ [𝑈𝑈 × 𝐴𝐴 × (
− 𝑇𝑇 𝐶𝐶 𝐶𝐶 , ) × / 1,000𝐵𝐵 /𝑀𝑀 ] “ ”

Page 84 of 1157 ends

15.F

Page 1012 of 2163 ends

© 2020 Centrica Business Solutions

Page 78 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
𝐶𝐶 = 𝐶𝐶 𝐶𝐶 𝐼𝐼 (𝑀𝑀 )
= ∑ [𝐴𝐴 𝐼𝐼 & × 𝐴𝐴 × (( – 𝑇𝑇 𝐶𝐶 𝐶𝐶 , )
× )/
+ ( – 𝑇𝑇 𝐶𝐶 𝐶𝐶 ,𝑈𝑈 ) × 𝑈𝑈 )/𝑈𝑈 ) / 1,000 𝐵𝐵
/𝑀𝑀 ] “ ”
𝐴𝐴 𝐶𝐶 𝐶𝐶 $ 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 = 𝐶𝐶 𝐶𝐶 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 × $/𝑘𝑘𝑘𝑘ℎ 𝑅𝑅

BASELINE USAGE AND COST
The energy baseline for this FIM is defined as the existing annual electric energy usage and natural gas costs at these facilities as shown in the table below.

Table 34 – FIM #7 Baseline Usage and Costs
Baseline
Electricity
Consumption
Baseline
Electricity Cost
Baseline Gas
Consumption Baseline Gas Cost Total Annual Cost
(kWh/yr) (per year) (therm/yr) (per year)
221,420 $39,180 19,457 $19,317 $58,497

POST RETROFIT ENERGY USE AND COST
The projected energy use and cost for these measures are shown in the table below.

Table 35 – FIM #7 Post Retrofit Energy Usage and Costs
Proposed
Electricity
Consumption
Proposed
Electricity Cost
Proposed Gas
Consumption
Proposed Gas
Cost Proposed Total
Annual Cost
(kWh/yr) (per year) (therm/yr) (per year)
137,155 $24,270 19,457 $19,317 $43,587

ENERGY AND COST SAVINGS
The energy savings are the difference between the Baseline and the Post Retrofit energy use and cost as summarized in the table below. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 36 – FIM #7 Energy and Cost Savings
Electricity
Consumption
Savings
Electricity Cost
Savings
Gas Consumption
Savings Gas Cost Savings Total Annual Cost
Savings
(kWh/yr) (per year) (therm/yr) (per year)
75,838 $13,420 0 $0 $13,420

Page 85 of 1157 ends

15.F

Page 1013 of 2163 ends

© 2020 Centrica Business Solutions

Page 79 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.8 FIM #8: SECONDARY TRANSFORMER INSTALLATION
Annual Cost Savings Implementation Cost Incentive/Rebate $10,222 $137,468 $0

FACILITIES AFFECTED
This FIM will be completed at the following sites:
• City Yard
• Police, Fire Station 1, Council Chambers
• Simpson Center
• Brubaker Park
A savings summary for the affected sites is provided in Table 37.

Table 37 – Transformer Savings Summary by Site
Facility Name Annual Utility Savings Operational Savings Total Annual Cost (per yr) (per yr) Savings
City Yard $5,160 $0 $5,160
Police, Fire Station 1,
Council Chambers $1,512 $0 $1,512
Simpson Center $2,545 $0 $2,545
Brubaker Park $1,005 $0 $1,005
TOTAL $10,222 $0 $10,222

OBSERVATIONS
During the preliminary site walk-through, three (8) older transformers were noted that are good candidates for replacement. These transformers waste energy, and this cost for waste is included on the utility bill. The transformers were “warm” to the touch and made excessive noise. This heat which makes them warm is wasted energy and thus is an area for potential savings.

RECOMMENDATION
Although often overlooked because of their more challenging economics for replacement, often difficult locations, and typical low priority compared to other measures, installing more efficient transformers can offer significant savings over the life of the transformer (often over 50 years). Centrica Business Solutions believes replacing the transformer with a very high-efficiency, custom-built device will provide valuable infrastructure improvements along with long-term energy savings.

SAVINGS SUMMARY
Savings associated with replacing the transformers with more efficient transformers is based on the construction, age, size, and the loading of the transformer. Secondary transformers are the typical target, particularly those that are 20-30 years old. More efficient transformers are constructed with better coils and are designed to reduce losses at part loads.

Page 86 of 1157 ends

15.F

Page 1014 of 2163 ends

© 2020 Centrica Business Solutions

Page 80 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
The savings were calculated using a tool that incorporates a database of historical transformer performance, using the age, make, model, and conditions to determine an expected efficiency of the existing transformers. Centrica Business Solutions engineers created an inventory of the existing transformers and validated their age, make, model, and location and then conducted a more detailed audit to identify the specific candidate transformers for replacement. This existing transformer was compared to high efficiency replacements of the same kVA rating to determine the energy and cost savings. Table 38 below lists the transformers targeted for replacement.

Table 38 - Transformer Replacement Summary
Facility Rating (kVA)
Police, Fire Station 1,
Council Chambers 150
Public Works Yard 112.5
Public Works Yard 75
Public Works Yard 50
Public Works Yard 75
Simpson Center 112.5
Simpson Center 30
Brubaker Park 45

BASELINE USAGE AND COST
The energy baseline for this FIM is defined as the energy losses with the existing transformers. This includes both the electrical losses from the inefficiency of the transformers and the increased cooling energy required to heat losses from the existing transformers. The baseline usage and costs are shown in the table below:

Table 39 – FIM #3 Baseline Usage and Costs
Building
Electrical
Losses
Electrical Losses
Annual Cost
Operation and
Maintenance Cost
Total Annual
Cost
(kWh/yr) (per year) (per year) (per year)
City Yard 31,148 $6,706 $0 $6,706
Police, Fire Station 1,
Council Chambers 13,497 $1,968 $0 $1,968
Simpson Center 14,755 $3,506 $0 $3,506
Brubaker Park 5,674 $1,286 $0 $1,286
Total 65,074 $13,465 $0 $13,465

Page 87 of 1157 ends

15.F

Page 1015 of 2163 ends

© 2020 Centrica Business Solutions

Page 81 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

POST RETROFIT ENERGY USE AND COST
The projected energy use and cost for this FIM are shown in the table below.

Table 40 – FIM #3 Post Retrofit Energy Usage and Costs
Building
Electrical
Losses
Electrical Losses
Annual Cost
Operation and
Maintenance Cost
Total Annual
Cost
(kWh/yr) (per year) (per year) (per year)
City Yard 4,523 $974 $0 $974
Police, Fire Station 1,
Council Chambers 1,972 $287 $0 $287
Simpson Center 2,093 $497 $0 $497
Brubaker Park 745 $169 $0 $169
Total 9,333 $1,927 $0 $1,927

ENERGY AND COST SAVINGS
The savings are the difference between the Baseline and the Post Retrofit energy usage and cost savings as summarized in the table that follows. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 41 – FIM #3 Energy and Cost Savings
Building
Electric
Consumption
Savings
Electrical Cost
Savings
Operation and
Maintenance Cost
Savings
Total Annual
Cost Savings
(kWh/yr) (per year) (per year) (per year)
City Yard 23,962 $5,160 $0 $5,160
Police, Fire Station 1,
Council Chambers 10,373 $1,512 $0 $1,512
Simpson Center 11,396 $2,545 $0 $2,545
Brubaker Park 4,436 $1,005 $0 $1,005
Total 50,166 $10,222 $0 $10,222

Page 88 of 1157 ends

15.F

Page 1016 of 2163 ends

© 2020 Centrica Business Solutions

Page 82 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.9 FIM #9: NETWORKABLE THERMOSTAT INSTALLATION
Annual Cost Savings Implementation Cost Incentive/Rebate $4,572 $241,007 $0

FACILITIES AFFECTED
This FIM will be completed at the following site:
• City Hall
• City Yard
• Gang Task Force
• PACT
• Police, Fire Station 1, Council Chambers
• Simpson Center
• SWAT Command/ GIT
• Fire Station 2
• Fire Station 4

OBSERVATION
The city currently controls their HVAC units through standalone programmable thermostats located in each facility. The lack of programming capability at most locations means that turning the system on/off or making changes to the setpoints must be made at the physical locations. This leads to wasted energy in several ways. First, in the few cases per year where the occupants forget to turn off the systems at night, they will continue to run and cause significant energy charges. The current thermostats also leave the temperature setpoints to the discretion of the occupants, not allowing the District to achieve their desired energy savings by keeping setpoints at their desired level. Maintenance staff need to rely on faculty to notify them of HVAC issues which may or may not be a programming issue. As such, the addition of networkable and programmable thermostats will allow both issues to be solved and provide potentially significant energy and operational savings.

RECOMMENDATION
Centrica Business Solutions recommends installing networkable thermostats for each of the AC and heating systems at the thirteen (13) sites provided in the list above. The networkable capability means that they will be connected the sites’ internet networks, so the equipment can be viewed and controlled remotely. The proposed system will provide a front-end control interface where maintenance staff can view temperatures and equipment statuses, set schedules, and change setpoints remotely. It will also provide many more options for locking out local thermostat control, setting control setpoint ranges, and allowing various options for scheduling. The identified units included in scope are as follows:

Page 89 of 1157 ends

15.F

Page 1017 of 2163 ends

© 2020 Centrica Business Solutions

Page 83 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table 42 – Proposed Networkable Thermostat Inventory
Facility Name Address
Number of
Networkable
Thermostats
City Hall 445 E Florida Ave, Hemet, CA 13
City Yard 3777 Industrial Ave, Hemet, CA 7
Gang Task Force 395 E Latham Ave, Hemet, CA 2
PACT 319 E Latham Ave, Hemet, CA 2
Police, Fire Station
1, Council Chambers 220 N Juanita St, Hemet, CA 27
Simpson Center 305 E Devonshire Ave, Hemet, CA 15
SWAT Command/
GIT 401 N Juanita St, Hemet, CA 2
Fire Station 2 895 W Stetson Ave, Hemet, CA 1
Fire Station 4 1035 S Cawston Ave, Hemet, CA 4
TOTAL 73

SAVINGS SUMMARY
Savings for this FIM are associated with energy conservation related to reducing the temperature setpoints and implementing setbacks through the new control system. These measures will allow the AC units and furnaces to have reduced operating hours through temperature control and setting back the setpoints during unoccupied times or used areas.

Although Centrica believes this measure will yield some electric and gas energy savings through reduced operating hours and stricter setpoints, we did not claim any energy savings for the measure. City of Hemet already operates the system effectively by only keeping the systems on when they are occupied, and they make sure setpoints are not too aggressive.

Energy Savings Summary
The following savings calculations are used for the temperature correction and setback at all the facilities. The same calculation will be used for cooling and heating. The “n” in the equation below represents the BIN for that specific calculation.

𝐴𝐴 $ 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 = 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 × $/𝑇𝑇ℎ 𝑒𝑒 𝑅𝑅
𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 (𝑇𝑇ℎ 𝑒𝑒 )
= [( + ) – (
+ )]/ (𝐵𝐵 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸 𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 × 1 𝑇𝑇ℎ 𝑒𝑒 /100 𝑀𝑀 )

Page 90 of 1157 ends

15.F

Page 1018 of 2163 ends

© 2020 Centrica Business Solutions

Page 84 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
= 𝐶𝐶 𝐶𝐶 𝐶𝐶 (𝑀𝑀 )
= ∑ [𝑈𝑈 × 𝐴𝐴 × (𝑇𝑇 ,𝑈𝑈 𝑈𝑈 – ) × 𝑈𝑈
/ 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
+ [𝑈𝑈 × 𝐴𝐴 × (𝑇𝑇 , – ) × / 1,000𝐵𝐵
/𝑀𝑀 ] “ ”
= 𝐼𝐼 (𝑀𝑀 )
= ∑ [𝐴𝐴 𝐼𝐼 & × 𝐴𝐴 × (( – 𝑇𝑇 , )
× )
+ ( – 𝑇𝑇 ,𝑈𝑈 ) × 𝑈𝑈 )) / 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
= 𝐶𝐶 𝐶𝐶 𝐶𝐶 (𝑀𝑀 )
= ∑ [𝑈𝑈 × 𝐴𝐴 × (𝑇𝑇 ,𝑈𝑈 𝑈𝑈 – ) × 𝑈𝑈
/ 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
+ [𝑈𝑈 × 𝐴𝐴 × (𝑇𝑇 , – ) × / 1,000𝐵𝐵
/𝑀𝑀 ] “ ”
= 𝐼𝐼 (𝑀𝑀 )
= ∑ [𝐴𝐴 𝐼𝐼 & × 𝐴𝐴 × (( – 𝑇𝑇 , )
× )
+ ( – 𝑇𝑇 ,𝑈𝑈 ) × 𝑈𝑈 )) / 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
𝐶𝐶 𝐶𝐶 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 (𝑘𝑘𝑘𝑘ℎ)
= [(𝐶𝐶𝐶𝐶 + 𝐶𝐶 )– (𝐶𝐶𝐶𝐶 𝐶𝐶 + 𝐶𝐶 𝐶𝐶)] × 𝐶𝐶ℎ 𝐸𝐸𝐸𝐸𝐸𝐸 𝐸𝐸 𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 ÷ 1,000 𝐶𝐶𝐶𝐶 = 𝐶𝐶 𝐶𝐶 𝐶𝐶 𝐶𝐶 𝐶𝐶 (𝑀𝑀 )
= ∑ [𝑈𝑈 × 𝐴𝐴 × (
− 𝑇𝑇 𝐶𝐶 𝐶𝐶 ,𝑈𝑈 ) × 𝑈𝑈 / 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
+ [𝑈𝑈 × 𝐴𝐴 × (
− 𝑇𝑇 𝐶𝐶 𝐶𝐶 , ) × / 1,000𝐵𝐵 /𝑀𝑀 ] “ ”
𝐶𝐶 = 𝐶𝐶 𝐶𝐶 𝐼𝐼 (𝑀𝑀 )
= ∑ [𝐴𝐴 𝐼𝐼 & × 𝐴𝐴 × (( – 𝑇𝑇 𝐶𝐶 𝐶𝐶 , )
× )/
+ ( – 𝑇𝑇 𝐶𝐶 𝐶𝐶 ,𝑈𝑈 ) × 𝑈𝑈 )/𝑈𝑈 ) / 1,000 𝐵𝐵
/𝑀𝑀 ] “ ”
𝐶𝐶𝐶𝐶 𝐶𝐶 = 𝐶𝐶 𝐶𝐶 𝐶𝐶 𝐶𝐶 𝐶𝐶 (𝑀𝑀 )
= ∑ [𝑈𝑈 × 𝐴𝐴 × (
− 𝑇𝑇 𝐶𝐶 𝐶𝐶 ,𝑈𝑈 𝑈𝑈 – ) × 𝑈𝑈 / 1,000 𝐵𝐵 /𝑀𝑀 ] “ ”
+ [𝑈𝑈 × 𝐴𝐴 × (
− 𝑇𝑇 𝐶𝐶 𝐶𝐶 , ) × / 1,000𝐵𝐵 /𝑀𝑀 ] “ ”
𝐶𝐶 = 𝐶𝐶 𝐶𝐶 𝐼𝐼 (𝑀𝑀 )
= ∑ [𝐴𝐴 𝐼𝐼 & × 𝐴𝐴 × (( – 𝑇𝑇 𝐶𝐶 𝐶𝐶 , )
× )/
+ ( – 𝑇𝑇 𝐶𝐶 𝐶𝐶 ,𝑈𝑈 ) × 𝑈𝑈 )/𝑈𝑈 ) / 1,000 𝐵𝐵
/𝑀𝑀 ] “ ”

Page 91 of 1157 ends

15.F

Page 1019 of 2163 ends

© 2020 Centrica Business Solutions

Page 85 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
𝐴𝐴 𝐶𝐶 𝐶𝐶 $ 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 = 𝐶𝐶 𝐶𝐶 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑆𝑆 × $/𝑘𝑘𝑘𝑘ℎ 𝑅𝑅

BASELINE USAGE AND COST
The energy baseline for this FIM is defined as the energy losses through building infiltration and conduction at the current thermostat temperature setpoints. The baseline usage and costs are shown in the table below
Table 43 – FIM #9 Baseline Usage and Costs
Location
Baseline Electric
Consumption
Baseline
Annual
Electrical
kWh Cost
Baseline Gas
Consumption
Baseline Gas
Cost Total Annual
Cost
(kWh/yr) (per year) (therm/yr) (per year)
City Hall 44,194 $7,511 2282 $2,530 $10,041
City Yard 22,557 $4,857 1276 $1,115 $5,972
Gang Task
Force 7,329 $1,397 309 $363 $1,760
PACT 8,108 $1,570 222 $1,405 $2,975
Police, Fire
Station 1,
Council
Chambers
66,619 $9,713 0 $5,794 $15,507
Simpson
Center 20,785 $4,641 2466 $2,867 $7,508
SWAT
Command/ GIT 24,664 $4,343 967 $1,133 $5,476
Fire Station 2 12,173 $2,224 1896 $2,211 $4,435
Fire Station 4 41,490 $7,073 5849 $6,817 $13,890
Total 247,919 $43,329 15,267 $24,235 $67,564

POST RETROFIT ENERGY USE AND COST
The projected energy use and cost is based on adjusted temperature sets points and adjusted programming for unoccupied hours. Set points, bin data, and unoccupied hours for calculations can be found in Appendix B. Projected energy use for this FIM are shown in the table below.

Page 92 of 1157 ends

15.F

Page 1020 of 2163 ends

© 2020 Centrica Business Solutions

Page 86 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table 44 – FIM #9 Proposed Usage and Costs
Location
Proposed
Electric
Consumption
Proposed
Annual
Electrical kWh
Cost
Proposed Gas
Consumption
Proposed Gas
Cost
Proposed
Total Annual
Cost
(kWh/yr) (per year) (therm/yr) (per year)
City Hall 43,927 $7,466 2154 $2,388.00 $9,854
City Yard 22,264 $4,794 1197 $1,046.00 $5,840
Gang Task
Force 7,159 $1,365 309 $363.00 $1,728
PACT 7,508 $1,453 990 $1,147.00 $2,600
Police, Fire
Station 1,
Council
Chambers
58,723 $8,561 6056 $5,794.00 $14,355
Simpson
Center 20,785 $4,641 2466 $2,867.00 $7,508
SWAT
Command/
GIT
15,936 $2,806 911 $1,067.00 $3,873
Fire Station 2 11,100 $2,028 1739 $2,028.00 $4,056
Fire Station 4 37,630 $6,415 5367 $6,255.00 $12,670
Total 225,032 $39,529 21,189 $22,955 $62,484

ENERGY AND COST SAVINGS
The savings are the difference between the Baseline and the Post Retrofit energy usage and cost savings as summarized in the table that follows. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 45 – FIM #9 Annual Usage and Cost Savings
Location
Annual
Electric
Savings
Annual
Electrical kWh
Cost Savings
Annual Gas
Savings
Annual Gas
Cost Savings Annual Total
Cost Savings
(kWh/yr) (per year) (therm/yr) (per year)
City Hall 240 $41 115 $128 $168
City Yard 264 $57 71 $62 $119
Gang Task
Force 153 $29 0 $0 $29
PACT 540 $105 200 $232 $338
Police, Fire
Station 1,
Council
Chambers
7,106 $1,037 0 $0 $1,037

Page 93 of 1157 ends

15.F

Page 1021 of 2163 ends

© 2020 Centrica Business Solutions

Page 87 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Location
Annual
Electric
Savings
Annual
Electrical kWh
Cost Savings
Annual Gas
Savings
Annual Gas
Cost Savings Annual Total
Cost Savings
(kWh/yr) (per year) (therm/yr) (per year)
Simpson
Center 0 $0 0 $0 $0
SWAT
Command/
GIT
7,855 $1,383 50 $59 $1,443
Fire Station 2 966 $176 141 $165 $341
Fire Station 4 3,474 $592 434 $506 $1,098
Total 20,598 $3,420 1,012 $1,152 $4,572

Page 94 of 1157 ends

15.F

Page 1022 of 2163 ends

© 2020 Centrica Business Solutions

Page 88 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.10 FIM #10: PLUG LOAD CONTROLS
Annual Cost Savings Implementation Cost Incentive/Rebate $2,343 $9,226 $0

FACILITIES AFFECTED
This FIM will be completed at the following sites:
• Police Station/ Council Chambers
• City Hall
• Library
A savings summary for the affected sites is provided in Table 46.

Table 46 – Plug Load Controls Savings Summary by Site
Facility Name Annual Utility Savings Operational Savings Total Annual Cost (per yr) (per yr) Savings
City Hall $986 $0 $986
Library $586 $0 $586
Police, Fire Station 1,
Council Chambers
$771 $0 $771
Total $2,343 $0 $2,343

OBSERVATION
Throughout City buildings there are many printers, monitors, water fountains, and other “plug-loads”, that constantly draw power. The loads on each of these circuits are often left on at all times of the day even if there is not demand for use. Further, many of these office appliances utilize a standby mode, which uses power even when the device appears to be off. An inventory of office equipment with these properties is listed in the table below:

Table 47 – Existing Plug Load Inventory
Facility Name Room Device Type Qty
Police Station/ Council Chambers Records Printer 2
Police Station/ Council Chambers Evidence Printer 1
Police Station/ Council Chambers Captain Operations Room Printer 1 Police Station/ Council Chambers Investigations Bureau Printer 2 Police Station/ Council Chambers Main Area Printer 0
Police Station/ Council Chambers Records Copier (15 Amps) 1 Police Station/ Council Chambers Main Area Copier (20 Amps) 2 Police Station/ Council Chambers Main Area Copier (20 Amps) 2

Page 95 of 1157 ends

15.F

Page 1023 of 2163 ends

© 2020 Centrica Business Solutions

Page 89 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Room Device Type Qty
Police Station/ Council Chambers Investigations Bureau Hot/ Cold Water Dispenser 1 Police Station/ Council Chambers Police Department Entrance Vending Machine (Soda) 1 City Hall 1st Floor Open Offices Printer 5
City Hall HR Printer 1
City Hall 2nd Floor Offices Printer 4
City Hall Upstairs Office by RR Printer 1
City Hall 2nd Floor Offices Copier (20 Amps) 1
City Hall Open Office Copier (20 Amps) 2
City Hall 2nd Floor Offices Hot/ Cold Water Dispenser 1 City Hall Employee Lounge Vending Machine (Soda) 1
City Hall Employee Lounge Vending Machine (Snacks) 1
City Hall 1st Floor Open Offices TV/ Monitor 1
City Hall HR TV/ Monitor 1
City Hall Employee Lounge TV/ Monitor 1
City Hall 2nd Flr Meeting Room TV/ Monitor 2
Library Library Printer 4
Library 1st Floor Copier (20 Amps) 1
Library Library Vending Machine (Soda) 1

RECOMMENDATION
Centrica recommends installing networkable outlets for the equipment listed in Table 32 above. The new outlets shall come equipped with Wi-Fi capabilities and will communicate back to a network gateway for remote access. The remote capabilities will allow for scheduling of the outlet devices so power is cut when occupants are not present. Further, override buttons shall be physically located on the outlets in order to provide occupants power should “off-hour” use of controlled office equipment be necessary.

SAVINGS SUMMARY
Energy savings are obtained through scheduling devices off during unoccupied hours. It must be noted that modern office equipment typically has a standby power mode, so savings are not obtained for the full power draw of the equipment. Savings are calculated using the following formulas:

Baseline Electric Consumption (kWh/yr) = Existing Equipment Wattage x Existing Annual Operating Hours Proposed Electric Consumption (kWh/yr) = Existing Equipment Wattage x Proposed Annual Operating Hours
Annual Electric Savings (kWh/yr) = Proposed Electric Consumption – Baseline Electric Consumption

BASELINE USAGE AND COST

Page 96 of 1157 ends

15.F

Page 1024 of 2163 ends

© 2020 Centrica Business Solutions

Page 90 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
The energy baseline for this FIM is defined as the existing annual electric energy and costs during unoccupied periods at these facilities as shown in the table below.

Table 48 – Plug Load Baseline Usage and Costs
Location
Baseline Electric
Consumption
(kWh/yr)
Baseline Annual
Electrical kWh Cost
(per yr)
City Hall 6,447 $1,096
Library 3,679 $651
Police, Fire Station 1, Council
Chambers 5,878 $857
Total 16,005 $2,604

POST RETROFIT ENERGY USE AND COST
The projected energy consumption and cost for these measures during unoccupied periods are shown in the table below.

Table 49 – Plug Load Proposed Usage and Costs
Location
Proposed Electric
Consumption
(kWh/yr)
Proposed Annual
Electrical kWh Cost
(per yr)
City Hall 645 $110
Library 368 $65
Police, Fire Station 1, Council
Chambers 588 $86
Total 1,600 $260

Page 97 of 1157 ends

15.F

Page 1025 of 2163 ends

© 2020 Centrica Business Solutions

Page 91 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

ENERGY AND COST SAVINGS
The savings are the difference between the Baseline and the Post Retrofit energy usage and cost savings as summarized in the table that follows. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 50 – Plug Load Annual Usage and Cost Savings
Location Annual Electric Savings Annual Electric Savings (kWh/yr) (per yr)
City Hall 5,803 $986
Library 3,311 $586
Police, Fire Station 1, Council Chambers 5,290 $771
Total 14,404 $2,343

Page 98 of 1157 ends

15.F

Page 1026 of 2163 ends

© 2020 Centrica Business Solutions

Page 92 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.11 FIM #11: SOLAR PHOTOVOLTAICS
Annual Cost Savings Implementation Cost Incentive/Rebate $144,596 $3,909,743 $200,000

FACILITIES AFFECTED
This FIM will be completed at the following sites:
• City Yard
• Fire Station 4
• Library
• Police, Fire Station 1, Council Chambers
The City of Hemet currently does not own any solar PV installations at either of the facilities noted above as we observed in our Investment Grade Audit (IGA). Several system types and locations had been considered at the above properties prior to identifying the proposed locations for solar PV. During our site walk we confirmed each building’s existing electrical service, switch gear and PV system point of interconnection. Due to the extensive conduit runs and obstructions, under-ground boring technology was discussed to physically connect the PV systems to the existing electrical systems. Underground public utilities will need to be located prior to construction.

RECOMMENDATION
Centrica will install three solar PV systems as summarized below:
• 141 kW (DC) Roof-mount solar PV system
• 40 kW (DC) Roof-mount solar PV system
• 531 kW (DC) Carport solar PV system
The PV system located next to Police/Fire Station 1 will be installed as Host PV system with the Library system utilizing the SCE Net Energy Meter Aggregation (NEMA) Program.

Table 51 – Solar PV Installation Summary
Facility Name Address Measure Type PV Size (kW) (DC)
Estimated FirstYear kWh
Generation
City Yard
3777 Industrial
Ave, Hemet, CA
92545
Roof-Mount 140.60 191,880
Fire Station 4
1035 S Cawston
Ave, Hemet, CA
92545
Roof-Mount 40.33 54,225
Library
(Beneficiary)
300 E Latham Ave,
Hemet, CA 92545 NEMA 0 342,947
Police, Fire
Station 1, Council
Chambers (HOST)
220 N Juanita St,
Hemet, CA 92545 Carport 522.43 494,144
TOTAL 703 1,083,196

Page 99 of 1157 ends

15.F

Page 1027 of 2163 ends

© 2020 Centrica Business Solutions

Page 93 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Centrica recognizes that there is a viable opportunity to install an energy storage system for the Carport array at Fire Station 1, Police Station, Council Chambers. This system would act as a peak shaving system and would reduce electrical demand cost. Battery storage system will discharge energy to the building when electric demand is at its highest usage during “peak demand”.

Table 52 – Energy Storage System/Microgrid Summary
Facility Name Address Measure Type Battery Size (kW)
(DC)
Battery kWh
Discharge
Capacity (kWh)
Police, Fire
Station 1, Council
Chambers
220 N Juanita St,
Hemet, CA 92545 ESS/Microgrid 250 500
TOTAL 250 500
The scope of work for this facility is provided below: (Turnkey) • Installation of Tier I solar modules totaling 703kW (DC). • Provide Smart Grid interactive inverters with web-based monitoring. • Install mechanical carport structure and racking system. • Installation of under canopy LED lighting.
• Provide the necessary AC/DC wiring and system disconnects. • Provide electrical and structural stamped drawings for all PV systems electrical and mechanical equipment.
• Complete the required Southern California Edison (SCE) interconnection application and gain system approval from the utility for all PV systems.
• Complete the required building and electrical permit application. • Provide for system commissioning, startup and As-built drawings. • Provide a total of 4-hours of safety training and general system operational procedures to City staff personnel on the new solar PV systems operation.

SAVINGS SUMMARY
Savings were calculated using a HelioScope models, shown in Appendix D. The software utilizes site specific information coupled with the total energy generation for the systems given the size and performance expectations and weather data for each specific area. The tables below include each facilities baseline kWh usage, energy cost and proposed energy savings within the first year of system operation.

BASELINE USAGE AND COST
The energy baseline for this FIM is defined as the annual electric energy usage of the site after FIMs 1 through 8 and Centrica’s 90% guarantee have been implemented.

Page 100 of 1157 ends

15.F

Page 1028 of 2163 ends

© 2020 Centrica Business Solutions

Page 94 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Table 53 – FIM #11 Baseline Usage and Costs
Building
Electrical
Consumption Electrical Annual
Cost
Operation and
Maintenance
Cost Total Annual Cost
(kWh/yr) (per year)
City Yard 282,349 $60,800 $0 $60,800
Fire Station 4 97,907 $16,691 $0 $16,691
Library
(Beneficiary) 575,063 $101,758 $0 $101,758
Police, Fire
Station 1, Council
Chambers (HOST)
650,685 $94,866 $0 $94,866
TOTAL 1,606,004 $274,115 $0 $274,115

POST RETROFIT ENERGY USE AND COST
The projected energy consumption after applying the Solar PV generation is shown in the table below.

Table 54 – Solar PV Post Retrofit Energy Usage and Costs Building
Electrical
Consumption Electrical Annual
Cost
Operation and
Maintenance
Cost Total Annual Cost
(kWh/yr) (per year)
City Yard 90,469 $29,158 $0 $29,158
Fire Station 4 43,682 $9,793 $0 $9,793
Library
(Beneficiary) 232,116 $63,397 $0 $63,397
Police, Fire
Station 1, Council
Chambers (HOST)
156,541 $39,592 $0 $39,592
TOTAL 522,808 $141,940 $0 $141,940

Page 101 of 1157 ends

15.F

Page 1029 of 2163 ends

© 2020 Centrica Business Solutions

Page 95 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

ENERGY AND COST SAVINGS
The savings are the difference between the Baseline and the Post Retrofit energy usage and cost savings as summarized in the table that follows. A 10% reduction is applied to the consumption and cost savings to account for Centrica’s guarantee.

Table 55 – Energy Storage Post Retrofit Energy Usage and Costs Building
Electrical
Consumption
Savings
Electrical Annual
Cost Savings
Operation and
Maintenance
Cost
Total Annual Cost
Savings
(kWh/yr) (per year)
Police, Fire
Station 1, Council
Chambers (HOST)
0 $12,421 $0 $12,421
TOTAL 0 $12,421 $0 $12,421
Table 56 – Solar PV Energy and Cost Savings
Building
Electrical
Consumption
Savings
Electrical Annual
Cost Savings
Operation and
Maintenance
Cost Savings
Total Annual Cost
Savings
(kWh/yr) (per year)
City Yard 191,880 $31,642 $0 $31,642
Fire Station 4 54,225 $6,899 $0 $6,899
Library
(Beneficiary) 342,947 $38,361 $0 $38,361
Police, Fire
Station 1, Council
Chambers (HOST)
494,144 $55,273 $0 $67,694
TOTAL 1,083,196 $132,175 $0 $144,596

Page 102 of 1157 ends

15.F

Page 1030 of 2163 ends

© 2020 Centrica Business Solutions

Page 96 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

4.12 FIM #12: WINDOW RETROFITS
Annual Cost Savings Implementation Cost Incentive/Rebate $2,690 $290,692 $0

FACILITIES AFFECTED
This FIM will be completed at the following sites:
• City Hall
• Council Chambers
• Police Station
• Fire Station 1
A savings summary for the affected sites is provided in Table 57.

Table 57 – Window Retrofit Savings Summary by Site
Facility Name
Annual Electrical
Savings Annual Gas Savings Total Annual Cost
Savings (per yr) (per yr)
City Hall $948 $448 $1,396
Fire Station 1, Police
Station, Council Chambers $1,168 $126 $1,294
Total $2,115 $575 $2,690

OBSERVATION
Police Station, Council Chambers, Fire Station 1, and City Hall have old single pane windows with metal frames. These windows have low R-values which result in greater heat transfer from the outside temperature to the conditioned space. As time progresses, the windows and seals corrode resulting in significant infiltration and creating comfort issues associated with “drafty” windows.

Fire Station 1 is a two-story building with a stairwell leading to living quarters on the second floor. A ceiling height window runs from the perpendicular to the stairs. The window has been identified as a potential safety hazard as fire fighters may trip running down the stairs and break through the window.

An inventory of the windows to be replaced is provided in the table below:

Table 58 – Existing Window Inventory
Facility Name Room Type Existing Description
Qty
(Existin
g)
Lengt
h (ft)
Heig
ht
(ft)
Council
Chambers East Hallway
Single Pane, Metal
Frame 1 7.50 3.67

Page 103 of 1157 ends

15.F

Page 1031 of 2163 ends

© 2020 Centrica Business Solutions

Page 97 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Room Type Existing Description
Qty
(Existin
g)
Lengt
h (ft)
Heig
ht
(ft)
Council
Chambers Room
Single Pane, Metal
Frame 1 7.50 3.67
Council
Chambers Room
Single Pane, Metal
Frame 1 7.50 3.67
Council
Chambers Room
Single Pane, Metal
Frame 1 7.50 3.67
Police
Department Records Office
Single Pane, Metal
Frame 1 1.00 5.08
Police
Department Records Office
Single Pane, Metal
Frame 1 4.67 5.42
Police
Department Police Entrance
Single Pane, Metal
Frame 1 28.00 8.00
Council
Chambers Council Chambers 2nd Flr HW
Single Pane, Metal
Frame 1 5.25 10.00
Council
Chambers
Council Chambers 2nd Flr Open
Space
Single Pane, Metal
Frame 2 5.17 8.25
Council
Chambers Empty Office
Single Pane, Metal
Frame 1 5.33 8.42
Council
Chambers Conference Room
Single Pane, Metal
Frame 8 1.25 8.42
Council
Chambers Captain's Office
Single Pane, Metal
Frame 1 2.58 8.42
Council
Chambers Management Assistant
Single Pane, Metal
Frame 1 2.58 8.42
Council
Chambers
Personnel & Training
Coordinator
Single Pane, Metal
Frame 1 5.25 8.42
Council
Chambers Admin Assistant
Single Pane, Metal
Frame 1 7.17 8.42
Council
Chambers Chief
Single Pane, Metal
Frame 1 7.17 8.42
Council
Chambers Support Services
Single Pane, Metal
Frame 1 3.92 8.42
Council
Chambers 2nd Floor Hallway- West
Single Pane, Metal
Frame 1 7.08 8.17
Police
Department Lt Support Services
Single Pane, Metal
Frame 1 3.00 6.00
Police
Department Bureau Lt
Single Pane, Metal
Frame 1 3.00 6.00
Police
Department Sgt Traffic Bureau
Single Pane, Metal
Frame 1 3.00 6.00
Police
Department Open Office
Single Pane, Metal
Frame 1 3.00 6.00

Page 104 of 1157 ends

15.F

Page 1032 of 2163 ends

© 2020 Centrica Business Solutions

Page 98 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Room Type Existing Description
Qty
(Existin
g)
Lengt
h (ft)
Heig
ht
(ft)
Police
Department Investigations
Single Pane, Metal
Frame 3 10.00 2.00
Police
Department Investigations
Single Pane, Metal
Frame 4 10.00 2.00
Police
Department Conference Room
Single Pane, Metal
Frame 1 20.00 2.50
Fire Station 1 App Bay
Single Pane, Metal
Frame 1 4.00 8.00
Fire Station 1 Workout Area
Single Pane, Metal
Frame 1 7.00 10.00
Fire Station 1 Workout Area
Single Pane, Metal
Frame 1 5.25 4.50
Fire Station 1 Room 1
Single Pane, Metal
Frame 1 7.00 6.00
Fire Station 1 Room 2
Single Pane, Metal
Frame 1 5.25 4.50
Fire Station 1 Room 3
Single Pane, Metal
Frame 1 5.25 4.50
Fire Station 1 Stairwell
Single Pane, Metal
Frame 1 16.00 5.00
Fire Station 1 Living Area
Single Pane, Metal
Frame 1 3.33 6.00
Fire Station 1 Living Area
Single Pane, Metal
Frame 1 2.42 5.25
City Hall Community Development
Single Pane, Metal
Frame 3 2.50 11.00
City Hall Community Development
Single Pane, Metal
Frame 2 2.50 11.00
City Hall Business Services
Single Pane, Metal
Frame 3 6.00 10.67
City Hall Business Services
Single Pane, Metal
Frame 4 6.00 5.25
City Hall Business Services
Single Pane, Metal
Frame 1 4.63 3.50
City Hall Open Area
Single Pane, Metal
Frame 2 2.92 2.17
City Hall Open Area
Single Pane, Metal
Frame 2 3.67 2.17
City Hall Open Area
Single Pane, Metal
Frame 2 2.00 2.25
City Hall Open Area
Single Pane, Metal
Frame 1 2.00 5.83

Page 105 of 1157 ends

15.F

Page 1033 of 2163 ends

© 2020 Centrica Business Solutions

Page 99 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021
Facility Name Room Type Existing Description
Qty
(Existin
g)
Lengt
h (ft)
Heig
ht
(ft)
City Hall Open Area
Single Pane, Metal
Frame 2 2.42 2.58
City Hall Open Area
Single Pane, Metal
Frame 2 2.67 2.58
City Hall Lobby Entrance
Single Pane, Metal
Frame 1 8.58 4.33
City Hall Conference Room
Single Pane, Metal
Frame 2 6.25 11.00
City Hall Office
Single Pane, Metal
Frame 2 6.25 7.42
City Hall Code Area
Single Pane, Metal
Frame 4 6.25 11.00
City Hall Code Office
Single Pane, Metal
Frame 1 6.25 11.00
City Hall Code Office
Single Pane, Metal
Frame 1 6.25 11.00
City Hall West Door
Single Pane, Metal
Frame 1 5.83 2.33
City Hall West Door
Single Pane, Metal
Frame 1 2.17 3.00
City Hall HR Area
Single Pane, Metal
Frame 2 11.00 2.17
City Hall HR Area
Single Pane, Metal
Frame 1 3.08 2.17
City Hall HR Office
Single Pane, Metal
Frame 1 5.42 5.92
City Hall HR Office
Single Pane, Metal
Frame 1 4.42 2.17
City Hall HR Office 2
Single Pane, Metal
Frame 1 6.17 9.83
City Hall HR Office 2
Single Pane, Metal
Frame 1 6.17 5.50

Page 106 of 1157 ends

15.F

Page 1034 of 2163 ends

© 2020 Centrica Business Solutions

Page 100 of 171 ends

Centrica Business Solutions Services
Investment Grade Audit
November 24, 2021

RECOMMENDATION
Centrica proposes to retrofit the existing windows listed in Table 41 with a supplemental window retrofit system.

With a supplemental window system, the existing single
pane windows shall be cleaned and remain in place. A
new double pane window shall be created to match the
existing frame size. The new window will be mounted
to the existing frame and sealed to make it airtight.

Krypton gas shall be charged into the space between the old single pane window and the new double pane
window to provide additional thermal insulative
properties. To account for extra the potential safety
hazard in Fire Station 4, the bottom pane shall be
retrofit with a supplemental window that has shatterproof glass. Before and after pictures can be seen above.

SAVINGS SUMMARY
There are three components that affect energy related to the efficacy of windows: conduction, infiltration, and radiation. Conduction occurs when there is a temperature difference between indoor air and outdoor air. Energy flows naturally from high to low temperatures, so heat is either gained or loss depending on heating or cooling seasons. Infiltration occurs when cracks exist in window frames.

Cracks in window frames leads to drafty rooms as well as lose energy through airflow penetrating or existing window cracks. Radiation is heat into a building due to solar energy directed through windows.

The heat is absorbed into furniture, carpet and directly into the air, placing further demand on heating and cooling systems.

Baseline Conduction Energy (Btu/yr) = Existing Window U-Value (Btu/h/sq ft/deg F) x Area of Window (sq ft) x (Outdoor Temperature – Indoor Temperature) (deg F) x Annual hours at each temperature Baseline Infiltration Energy (Btu/yr) = 1.08 x Existing Flowrate Through Cracks (cfm) x (Outdoor Temperature – Indoor Temperature) x Annual hours at each temperature Baseline Radiation Energy (Btu/yr) = Solar Heat Gain Coefficient of Existing Windows x Area of Window (sq ft) x Solar Flux on Window Surface (Btu/h/sq ft) Annual hours at each temperature Total Baseline Energy (Btu/yr) = Baseline Conduction Energy + Baseline Infiltration Energy + Baseline Radiation Energy
Proposed Conduction Energy (Btu/yr) = Proposed Window U-Value x Area of Window x (Outdoor Temperature – Indoor Temperature)
Proposed Infiltration Energy (Btu/yr) = 1.08 x Proposed Flowrate Through Cracks (cfm) x (Outdoor Temperature – Indoor Temperature) x Annual hours at each temperature Proposed Radiation Energy (Btu/yr) = Solar Heat Gain Coefficient of Proposed Windows x Area of Window (sq ft) x Solar Flux on Window Surface (Btu/h/sq ft) Annual hours at each temperature Annual Water Savings (gal/ yr) = Proposed Consumption (gal/ yr) - Baseline Water Consumption (gal/yr)

Page 107 of 1157 ends
← All documents from this meeting