17.F

Page 1525 of 2581 ends

p / 6 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience

CITY OF SAN MARCOS ON-CALL TRAFFIC ENGINEERING

AND SUPPORT SERVICES

CONTRACT INFORMATION (CRA - PRIME CONSULTANT)
Owner: City of San Marcos
Contact: Damian Schoenecke | 760-744-1050 ext. 3246
Project Type: Traffic Engineering & Design, Traffic Operations, Civil Engineering Design, Staff Support Duration: 2020 - Ongoing
Value: Up to $1 M
CRA is providing the City of San Marcos with a variety of traffic engineering services. Task orders under this contract include: the preparation of traffic calming studies, cycle track feasibility studies and alternatives development, cost estimates, ITS evaluations, safety analysis and countermeasure development, traffic calming evaluation and design, traffic engineering standards and guidelines development and manual updates, grant writing, plan checks, staff report preparation and presentation to the Traffic Commission and City Council.

Specific task orders include the following:
ƒ San Elijo Cycle Track and Traffic Control Plans
ƒ Nordahl Road Adaptive Traffic Control System Feasibility Study ƒ Nordahl Road & Montiel Road Signage and Signal Operations Evaluation ƒ Speed Cushion Policy and Procedure Development
ƒ Local Roadway Safety Plan (LRSP)
ƒ Intersection Sight Distance Standards
ƒ Traffic Commission Guidelines
ƒ Traffic Signal Design Manual Update
ƒ Traffic Impact Study Guidelines Peer Review
ƒ HSIP Cycle 10 Applications
ƒ Traffic Operations Analysis and Signal Timing Improvements at the Creekside Marketplace Shopping Center ƒ Traffic Calming Solutions and Concept Design at Multiple Locations ƒ Guard Rail Needs Assessment
ƒ Conceptual Roundabout Feasibility Study
ƒ General Traffic Engineering Support such as Speed Studies and Plan Checks ƒ Neighborhood Traffic Calming Guideline
ƒ Citywide Engineering and Traffic surveys (E&TS) at 120+ segments.

Projects and On-Call Experience

Page 108 of 378 ends

17.F

Page 1526 of 2581 ends

p / 7 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience
Mission Valley Community Plan Update and EIR
Mission Blvd Public Spaces and Active Transportation Plan CRA is currently providing as-needed (3rd term) traffic engineering services for the City of San Diego Planning Department. Task orders from this contract focus on long-range mobility planning projects including mobility element updates, corridor studies, policy development and mobility research projects, as well as conceptual design and roundabout feasibility. Some of the task orders issued:
ƒ Multimodal Evaluation Guidelines
ƒ Pedestrian and Bicycle Demand/Propensity Models
ƒ Person Trip Generation Assessment
ƒ Transit Priority Area (TPA) Parking Standards and Studies ƒ SB 743 Implementation and VMT-based Impact Fee Program ƒ Morena Boulevard Corridor Study
ƒ Mobility Element Updates

MISSION VALLEY COMMUNITY PLAN UPDATE
CRA prepared the Mobility Element, Mobility Technical Report, and Traffic Impact Study in support of the Mission Valley Community Plan Update. The planned mobility system consists of pedestrian and bicycle facilities, transit routes and stops (bus and light-rail), and roadways, parking needs & utilizations, as well as innovative mobility features such as a potential aerial tramway and demand-responsive community circulators. An SB 743
compliant traffic analysis was performed as part of the Mobility Technical Report, documenting mode share per capita for the various alternatives. The Mission Valley Community Plan Update is the winner of this 2020-2021 San Diego American Planning Association (APA) Comprehensive Plan (Large Jurisdiction) at both local- and state-level!

MISSION BLVD PUBLIC SPACES AND ACTIVE TRANSPORTATION PLAN This project focused on identifying opportunities for public spaces, and bicycle and pedestrian improvements within the Pacific Beach community.

CRA was responsible for assessing the benefits and constraints of eight corridor alternatives, as well as the potential cost and timing of implementation of the improvements. Final project recommendations consisted of traffic calming features, pedestrian and bicycle facility enhancements, emergency vehicle access improvements, and traffic control modifications, including a one-lane roundabout. A prioritization process was employed to identify high priority projects.

CITY OF SAN DIEGO TRAFFIC ENGINEERING AS-NEEDED SERVICES

CONTRACT INFORMATION (CRA - PRIME CONSULTANT)
Owner: City of San Diego
Contact: Maureen Gardiner | 858-449-9388
Project Type: Mobility Plans and Elements, Parking Studies, Corridor Studies, Complete Street Design Guidelines, Model Output Adjustment Tool, ZEV Strategy, etc.

Duration: 2015-2020, 2020-2024
Value: Up to $2.05M for Each Contract

Page 109 of 378 ends

17.F

Page 1527 of 2581 ends

p / 8 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience
EL CAJON BLVD + PALM AVENUE
GREEN STREET WITH "GARDEN" SEATING

THIS CONCEPT IS INSPIRED BY THE EXISTING

PLANTING IN THE EXISTING MEDIANS ON EL
CAJON BLVD. THIS CONCEPT INCORPORATES

AREAS FOR SEATING UNDER LARGE CANOPY

SHADE TREES AND LANDSCAPE AREAS WITH

PLANTING COMPLIMENTARY TO THE MEDIAN

PLANTING
CONCEPT SUMMARY:
• EL CAJON BLVD: TREES LARGE CANOPY

SHADE TREES AT SIDEWALK, FLOWERING

ORNAMENTALS AT ROUNDABOUT
• PALM AVENUE TREES: 2 SPECIES - SMALL

SCALE EVERGREEN TREES AND FLOWERING

ACCENT TREES, BOTH APPROPRIATE FOR

PLANTING UNDER POWER LINES
• UNDERSTORY PLANTING: MIX OF FLOWERING

NATIVE SHRUBS, GRASSES AND

SUCCULENTS
• SEATING AREAS BETWEEN PLANTING FOR

CAFE TABLES OR BENCHES
• PARKLETS AT ROUNDABOUT WITH SEAT

WALLS AND ACCENT PAVING
• DECORATIVE CROSSWALK PAVING AT

ROUNDABOUT
• STORMWATER TREATMENT INTEGRATED

INTO PLANTING AREAS
SCALE: 1" = 120'-0"
0' 60' 120'
N

PALM AVENUE

JOHNSON AVENUE

RICHARDSON AVENUE

RICHFIELD AVENUE

MILLAR AVENUE

EL CAJON BLVD

EXISTING MEDIAN

PLANTING TO REMAIN

EXISTING MEDIAN

PLANTING TO REMAIN

SEATING AREA WITH ACCENT

PAVING AND SEATWALLS

ENLARGEMENT NTS

GARDEN ROOM

SEATING AREAS

DECORATIVE

CROSSWALKS

CANOPY SHADE TREES

IN PLANTING AREAS

DIAGONAL PARKING

EVERGREEN SHADE TREES

AND UNDERSTORY PLANTING

FLOWERING ACCENT TREES

AND UNDERSTORY PLANTING

ROUNDABOUT CONCEPTS

SEE ENLARGEMENTS

PARKLET WITH

SEATING AND

ACCENT PAVING
EL CAJON STREETSCAPE | CONCEPT IDEAS

EDGE OF BUILDING
FURNISHING, TYP.

FACE OF CURB

PLANTING AREA
CANOPY TREE, TYP.

EL CAJON BLVD + PALM AVENUE
GREEN STREET WITH "GARDEN" SEATING

THIS CONCEPT IS INSPIRED BY THE EXISTING

PLANTING IN THE EXISTING MEDIANS ON EL
CAJON BLVD. THIS CONCEPT INCORPORATES

AREAS FOR SEATING UNDER LARGE CANOPY

SHADE TREES AND LANDSCAPE AREAS WITH

PLANTING COMPLIMENTARY TO THE MEDIAN

PLANTING
CONCEPT SUMMARY:
• EL CAJON BLVD: TREES LARGE CANOPY

SHADE TREES AT SIDEWALK, FLOWERING

ORNAMENTALS AT ROUNDABOUT
• PALM AVENUE TREES: 2 SPECIES - SMALL

SCALE EVERGREEN TREES AND FLOWERING

ACCENT TREES, BOTH APPROPRIATE FOR

PLANTING UNDER POWER LINES
• UNDERSTORY PLANTING: MIX OF FLOWERING

NATIVE SHRUBS, GRASSES AND

SUCCULENTS
• SEATING AREAS BETWEEN PLANTING FOR

CAFE TABLES OR BENCHES
• PARKLETS AT ROUNDABOUT WITH SEAT

WALLS AND ACCENT PAVING
• DECORATIVE CROSSWALK PAVING AT

ROUNDABOUT
• STORMWATER TREATMENT INTEGRATED

INTO PLANTING AREAS
SCALE: 1" = 120'-0"
0' 60' 120'
N

PALM AVENUE

JOHNSON AVENUE

RICHARDSON AVENUE

RICHFIELD AVENUE

MILLAR AVENUE

EL CAJON BLVD

EXISTING MEDIAN

PLANTING TO REMAIN

EXISTING MEDIAN

PLANTING TO REMAIN

SEATING AREA WITH ACCENT

PAVING AND SEATWALLS

ENLARGEMENT NTS

GARDEN ROOM

SEATING AREAS

DECORATIVE

CROSSWALKS

CANOPY SHADE TREES

IN PLANTING AREAS

DIAGONAL PARKING

EVERGREEN SHADE TREES

AND UNDERSTORY PLANTING

FLOWERING ACCENT TREES

AND UNDERSTORY PLANTING

ROUNDABOUT CONCEPTS

SEE ENLARGEMENTS

PARKLET WITH

SEATING AND

ACCENT PAVING
EL CAJON STREETSCAPE | CONCEPT IDEAS

EDGE OF BUILDING
FURNISHING, TYP.

FACE OF CURB

PLANTING AREA
CANOPY TREE, TYP.

CRA is actively performing as-needed engineering services for El Cajon. Task orders from this contract have included grant writing, active transportation plan, safety studies, complete streets roadway and green streets design, roundabout design, and park/recreational facilities. Signing and striping plans and signal modifications played a big role in most projects. Some of the task orders under this contract include the following:
ƒ Systemic Safety Analysis Report Program (SSARP)
ƒ Active Transportation Plan
ƒ SANDAG SGIP Grant Writing
ƒ Caltrans ATP and HSIP Grant Writing
ƒ Jamacha Road Corridor Improvements
ƒ Wells Park Improvements

EL CAJON TRANSIT CONNECTIONS
CRA is leading the final design for two concurrent adjacent projects providing much needed multi-modal connections to the El Cajon Transit Center. These projects were developed based on the City’s Transit District Specific Plan (mobility improvement recommendations were developed by CRA) and are both funded by the SANDAG SGIP grant program for design and construction, for which CRA prepared the grant applications on behalf of the City. The first project will improve El Cajon Boulevard between Chamberlain Avenue and Lexington Avenue with minor improvements on Johnson Avenue and Palm Avenue. The focal point of the project is a modern roundabout at the 5-legged intersection of El Cajon Boulevard and Johnson Avenue. This will be the first of three planned roundabouts along the El Cajon Boulevard corridor. Other design elements include a road diet, widened sidewalks with bulb-outs, placemaking to allow opportunities for businesses and community gathering, and landscaping with trees and LID planters. Additionally, the project will serve as a direct connection for the proposed Class I Johnson Avenue Neighborhood Trail. The second project will enhance the Main Street corridor between Marshall Ave and Johnson Ave. A sidewalk-level Class IV bikeway will be installed along the south side of Main Street with a traditional
Class IV on the
north side. Extensive
landscape and BMPs
will transform this area
visually and promote
increased pedestrian
usage. The combined
effect of these two
projects is intended
to revitalize the area
around the Transit
Center and encourage redevelopment.

CITY OF EL CAJON ON-CALL PROFESSIONAL SERVICES

CONTRACT INFORMATION (CRA - PRIME CONSULTANT)
Owner: City of El Cajon
Contact: Mario Sanchez | 619-441-1651
Project Type: Active Transportation Plan, Safety Study, Grant Writing, Complete Streets Design, Park Design
Duration: 2019 - Ongoing
Value: Varied by Task Order

Page 110 of 378 ends

17.F

Page 1528 of 2581 ends

p / 9 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience

WILDOMAR GENERAL PLAN UPDATE

CONTRACT INFORMATION (CRA - SUB CONSULTANT)
Owner: City of Wildomar
Contact: Matthew Bassi, City Contract Manager | 951-677-7751 ext. 213 Project Type: Transportation Planning, Traffic Operations, Traffic Engineering Design, Staff Support Duration: 2022 - Ongoing
Value: $172k
CR Associates is currently supporting the City in updating the Mobility Element of its General Plan. The planned roadway and active transportation networks are mostly consistent with those from our previous efforts, with minor adjustments to better accommodate future land uses. Utilizing “RIVCOM”, CR Associates delivered the travel demand modeling in-house, which included base year calibration and analysis of future-year alternatives such as forecast traffic volumes and vehicle miles traveled. Additionally, we conducted a goods movement study and established the City’s first truck route network. The General Plan Update is now available for public review.

Page 111 of 378 ends

17.F

Page 1529 of 2581 ends

p / 10 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience
Technical Approach/Experience

ENGINEERING DESIGN
When providing engineering design, CRA always
considers a balance between “all users” including
pedestrians, bicyclists, recreational users, trail users, as well as trucks, buses, light rail, freight rail, and automobiles. We also use the latest and best design
criteria and guidelines and utilize fundamental design
resources including, but not limited to:
 City of Hemet Standard Drawings
 City of Hemet Grading and Erosion Control
Standards
 City of Hemet General Notes
 2024 “Greenbook” Standards
 Caltrans Highway Design Manual (HDM)
 Caltrans Standard Plans
 California Manual on Uniform Traffic Control
Devices (CA-MUTCD)
 National Association of City Transportation
Officials (NACTO) via Caltrans Deputy Directive
64-R1
 Transportation Research Board (TRB) and Federal
Highway Administration (FHWA) planning and
design guides
CRA believes in working hand-in-hand with city staff
and getting stakeholder input in the early stages
of a design project. We will develop conceptual
layouts with supporting details (e.g., curb-to-curb
improvements, cross sectional transitions, striping,
traffic calming devices, landscaping elements,
sample intersection treatments) to bring forth to the
community for input. As we obtain both city staff
and community input, we take the approach
to focus and refine the design to a significant level
of completeness.

This approach identifies and resolves project
constraints so that we can, not only establish
project limits, sight lines, controlled speeds, and
other fundamental roadway design principles, but
also balance design components such stormwater
treatment requirements and resolve utility conflicts.

We believe we are well equipped to tackle any and
all projects identified in the City’s Capital
Improvement Program!

TRAFFIC ENGINEERING DESIGN
CRA is dedicated to delivering comprehensive
services that exceed the City of Hemet’s expectations.

Our team specializes in traffic engineering design,
led by seasoned professionals Tomo Takahashi and
Jerard Madrigal. Tomo offers over 18 years of private
sector experience, while Jerard brings more than 13
years of public sector expertise. They are backed by a
skilled team with the technical expertise and software
proficiency required to efficiently and accurately
complete a variety of traffic engineering design
tasks. Our staff also regularly attend training and
workshops to stay updated on new developments
and techniques, ensuring time and cost savings for
the City.

Park Boulevard Exhibit Model

ROBINSON AVENUE

PARK BOULEVARD
Our experience in developing PS&E documents for
permitting, public bid, and low-bid construction
ensures that contract documents are concise and
well-organized to avoid costly delays and change
orders. We provide construction support throughout
the project, offering quick, clear, and well-thoughtout solutions for RFIs and shop drawings presented by the contractor. We understand that each project
has specific needs, which may include data collection,
surveying, right-of-way mapping, utility investigation, and stakeholder and community engagement. Once
the project scope is determined, CRA will obtain
necessary as-builts and right-of-way information from
the City. This information will be verified in the field to ensure consistency and conformity. Field verification
may include items such as confirming roadway

Page 112 of 378 ends

17.F

Page 1530 of 2581 ends

p / 11 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience
width, conducting sign inventory, and assessing and
confirming existing signal equipment (both above
ground and below ground). Project specifications will
follow the boilerplate provided by the City, and cost
estimates will utilize recent bid results.

We have collaborated with several railroad agencies
and CPUC to design for complex design features
for signals adjacent to railroad crossings, including
railroad pre-emption analysis, queue cutter signals,
and pre-signals. Additionally, we have obtained
numerous Caltrans encroachment permits related
to traffic engineering design. CRA is also a teaming
partner on the SR-91 Eastbound Corridor Operations
Project (ECOP) and the I-15 Express Lanes Southern
Extension, so we are familiar with Caltrans District
8 standards and practices. We are also in the final
design phase of the Coachella Valley Arts and
Music Line, which will feature nearly nine miles of
interactive Class I and Class IV bikeways in the Cities of La Quinta, Indio, and Coachella. The project will
incorporate safety features such as bike signals and
blank-out signs at 21 signalized intersections in total!

PLAN CHECK SERVICES FOR TRAFFIC

ENGINEERING PLANS
Through our vast on-call experience, we have
supported agencies with various types of plan
check services for traffic engineering plans, such as
roundabouts, cycle tracks, traffic signals, and traffic control. We work closely with city staff to provide
detailed feedback and recommendations. Our plan
check process involves identifying risks, safety,
constructability, inconsistencies, and compliance
with standards, guidelines and best practices. Our
plan check process is designed to identify and
resolve potential issues early in the process, thereby
avoiding costly delays and modifications during
the construction phase. Upon receiving the project
documents, our team conducts an initial review to
understand the scope and complexity of the project.

This includes checking for completeness, verifying
that all required information and plans are included,
and identifying any immediate areas of concern.

In addition to our technical capabilities, we prioritize clear and effective communication with city staff and
stakeholders. Our team provides regular updates and
collaborates with all parties involved to facilitate a
smooth review process. By leveraging our extensive
experience and technical expertise, we ensure that
the cities we support receive high-quality, reliable
plan check services that contribute to the successful
implementation of these projects.

COMPLETE STREETS ROADWAY
DESIGN
CRA is highly experienced in active transportation
infrastructure design. With a deep understanding
of the various NACTO Guides, American Public
Transportation Association Standards, FHWA
Planning and Design Guides, and the California
MUTCD, we have proactively applied our knowledge
to advance innovative bike and pedestrian
infrastructure throughout the region. We have led the
planning, analysis, design, and grant funding pursuits
of numerous Class I, Class II, and Class IV facilities
and pride ourselves on leading the design of the
first protected intersection in Southern California, in addition to several subsequent protected intersection
projects. We understand what it takes to move
transformative infrastructure from “Concept to
Concrete”.

Additionally, our team’s complete/green streets
knowledge and experience is unmatched. CRA staff
are especially passionate about this line of work
and are dedicated to helping the City of Hemet
achieve its goal of providing safe, livable, and vibrant corridors that accommodate all modes. We have
the expertise to strategically prescribe, analyze, and
design custom solutions to create streets where
bikes, pedestrians, transit, automobiles and all other
modes can safely interact with one another. Our
past projects include raised crosswalks, road diets,
pop-outs, and transit stops, as well as low impact
development green infrastructure, signal design,
lighting, landscape and irrigation, street furnishings, and utility relocation work that these types of projects also demand.

Page 113 of 378 ends

17.F

Page 1531 of 2581 ends

p / 12 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience
12th Street and D Avenue Roundabout
CRA staff are also exceptionally equipped to
handle the complexities of roundabout analysis
and design. Many of our roundabout projects are
focused on limiting impacts to existing conditions
while also achieving safety, mobility, and budgetary
goals. We have the practical knowledge to initially
assess improvement feasibility at a high level, and
to also get into the fine details of redesign at the
preliminary and final engineering stages to define
critical design criteria and solutions. Roundabouts
often require more coordination than typical roadway
improvements – we understand the need to work with
utilities, adjacent landowners, and other stakeholder
at early stages to ensure a successful project.

TRAFFIC ENGINEERING
As a firm that regularly provides on-call services to
local jurisdictions, CRA has unparalleled knowledge
of policies, ordinances, standards, and guidelines
throughout Southern California. We often bring state
and nationwide best practices and our own creativity
and innovation to our clients.

SB 743 IMPLEMENTATION AND

TRAFFIC IMPACT STUDIES
The world of transportation analyses changed in
a big way with the adoption of SB 743. Since July
1, 2020, SB 743 has changed CEQA requirements
to de-emphasize environmental impacts related
to automobile capacity and level of service and
increases emphasis on impacts related to vehicle
miles traveled (VMT). CRA has experience in
preparing and reviewing VMT-based Traffic Impact
Analysis (TIA) on both project- and program- levels.

When preparing or reviewing VMT-based TIS, CRA
will ensure that the County of Riverside Transportation Analysis Guidelines for Level of Service Vehicle
Miles Traveled (County’s TAG) are followed, while
also ensuring our approach is consistent with the
latest case law. Our experience with VMT impacts
and VMT mitigation (such as the Transportation
Demand Management Program) as well as VMTbased transportation/development fee programs will allow us to ensure that the VMT reductions associated
with each TDM program or mobility infrastructure
improvement is consistent with those identified in
Appendix F of the County’s TAG. VMT reducing
measures will be evaluated using methodologies

Page 114 of 378 ends

17.F

Page 1532 of 2581 ends

p / 13 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience
outlined in the County’s TAG, which are consistent
with CAPCOA’s Handbook for Analyzing Greenhouse
Gas Emission Reductions, Assessing Climate
Vulnerabilities, and Advancing Health and Equity.

When it comes to preparing or reviewing a LOSbased Transportation Analysis, CRA will ensure that the County’s TAG are followed. Our approach can be
summed up as “for the public good” with the goal of
ensuring that any approved document is defensible,
technically sound, reflects field conditions, and
that any proposed physical improvements are
implementable and consistent with both the City’
Roadway Circulation Master Plan and the Roadway
Classification Cross-Sections. Through our work for
public agencies, CRA staff always aims to provide
a clear, fair, defensible, and comprehensive review
process. This means that at the on-set of a project,
CRA, in coordination with the City, will provide clear
and concise feedback on the Scoping Agreement.

For example, project trip distribution in the Scoping
Agreement can be the most debatable yet critical
component to a traffic study, CRA will review and
comment on these assumptions based on Big Data
(origin/destination) and census data information. In
addition, we ensure that traffic-specific factors such
as peak hour factor, signal timing, queuing, and
cumulative volumes are based on both historic and
anticipated growth consistent with specific plans, the
general plan or regional plan. We also verify that the
proposed improvements against the design plan,
truck/vehicle turning templates, ultimate buildout of
the Mobility Element, and other relevant documents.

To streamline the review process, CRA keeps track of
our comments in a signal coloring system, where red
= need to resolve, yellow = need minor adjustment,
green = applicant addressed the previous comments.

TRAFFIC OPERATIONS
CRA brings a fresh perspective to the application
of state-of-the-art traffic operational analysis tools
including VISSIM, Synchro/SimTraffic, VISTRO, Traffix,
Rodel and SIDRA, for roundabouts. For internal staff
training, CRA has developed step-by-step guides
on the learning and mastering of each software
application.

We know when and how to apply these advanced
analytical tools in a cost-effective manner, focused
on efficiently extracting the necessary key variables
and performance indicators as measures of project
benefits and worthiness. We understand the correct
application of these tools, coupled with the necessary
expertise related to mobility planning, design and
multimodal integration.

For example, we regularly apply traffic operations
to our roadway design and traffic calming design
projects to include treatments such as bicycle
phasing, lead pedestrian intervals, and pedestrian
scrambles. We have second-to-none experience in
the analysis of transportation facilities (intersections, roadway segments, corridors, etc.) and we pride
ourselves in our “ground truthing” approach which
consists of first understanding the existing conditions of any facility we analyze in order to provide feasible recommendations that will work and are appropriate
in the context of the community. Our PS&E work
with SANDAG on a number of regional bikeway
projects relies on accurate traffic analyses to both
communicate with local agency partners and to
inform traffic operational effects resulting from the
installation of bicycle or pedestrian facilities.

When it comes to traffic calming, we always take a
holistic and detailed look at the roadway or areas of
concern. The key items are to identify the cause(s)
behind the speeding issues, determine whether
the concern is based on perception or on actual
field conditions, as well as the potential solutions.

These potential solutions are then vetted based
on level of effectiveness, construction cost, equity,

Page 115 of 378 ends

17.F

Page 1533 of 2581 ends

p / 14 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 3. Section I – Experience
Example Micro-Simulation
maintainability, and other environmental concerns.

For example, sometimes edge striping is selected
over speed cushions because it is a relatively lowcost solution and reduces the traveled speeds to acceptable levels, whereas a speed cushion, which
may provide further travel speed reduction, however,
would use-up a significant amount of the budget.

We also understand the needs to maintain traffic
calming measures, especially those in high traffic
volume areas. As such, we are conscious about the
return of investment for the City, the staff and funding availability of the public works department, and the
ability of the street-sweeping contractor to clean
around any potential traffic calming measures.

Computerized multimodal, micro-simulation is
another valuable tool that CRA can offer in support of
local agency review and public outreach for projectlevel efforts. This tool can be used to easily convey complex technical concepts and information in an
understandable manner via graphical outlets. Our
micro-simulation capabilities provide highly realistic
visual representations of the interface between
automobile travel and other travel modes (e.g.
cycling, walking, bus, rapid transit, and light rail).

Our use of microsimulation analysis proved to be
essential for communicating the potential impacts
and benefits of the 6th Avenue Promenade Feasibility
Study in 2018. The community was able to clearly
see the potential project effects and provide input
on preferred alternatives. This project recommended
removing a free-left turn lane coming off the I-5
freeway onto 6th Avenue, adjacent to Balboa Park.

Page 116 of 378 ends

17.F

Page 1534 of 2581 ends

p / 15 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118

4. Section II – Personnel
Team Organization and Key Staff Qualifications
CRA will serve as the sole consultant for this contract. We are certified DBE and SBE in California. We have assembled a robust technical team meticulously chosen to fulfill all potential tasks and service needs arising from this on-call contract.

Our proposed contract manager, Phuong Nguyen, TE, will be the primary point of contact for the City, overseeing all task orders within the contract. Phuong has delivered hundreds of traffic studies both for public transportation projects and private development projects throughout Southern California. He has a great understanding of requirements of the various public agencies in the Western Riverside Region, including the City of Hemet.

Phuong will be supported by a team of well qualified key staff members and a deep bench of skilled engineering professionals. Monique Chen, TE, will take on the role and will conduct quality assurance and quality control on all deliverables.

The CRA team organizational chart is depicted below. Abbreviated resumes for key personnel (noted on this organizational chart below with bold text) are included on the following pages.

TRAFFIC ENGINEERING SUPPORT
(REVIEW OF TRAFFIC STUDIES, SCOPING

AGREEMENTS AND TIAS, PREPARATION
OF WARRANT ANALYSES, ETC.)
Phuong Nguyen, TE
Jonathan Sanchez, PE, TE, PTOE
Joey Perez, EIT
Cristian Belmudez
Jesus Martinez
Jackson Schulz

TRAFFIC ENGINEERING DESIGN
(PREPARATION OF PLANS, SIGNAL
TIMING, COST ESTIMATES, ETC.)
Tomo Takahashi, PE
Jerard Madrigal, TE
Laura Hernandez, PE
Alyssa Foley, PE
Tyler Rausch, EIT

CITY OF HEMET

CONTRACT MANAGER
Phuong Nguyen, TE

DEPUTY PROJECT MANAGER
Jonathan Sanchez, PE, TE, PTOE
PRINCIPAL-IN-CHARGE + QA/QC
Monique Chen, TE
Bold = Key Personnel

Page 117 of 378 ends

17.F

Page 1535 of 2581 ends

p / 16 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 4. Section II – Personnel
Phuong is a Senior Traffic Engineer who leads projects which include traffic operations studies, traffic microsimulations, parking plans, VMT/GHG reduction quantifications, transportation demand management plans, Intersection Control Evaluations (ICE) and conceptual engineering. Phuong is a leader in his profession in the application of Big Data to quantify pandemic/post-pandemic travel behavior and has expertise in TransCAD (4-Step Model), Activity-Based Model, SimTraffic and Vissim microsimulation, Synchro traffic analysis, parking analysis, and transportation equity research. His commitment to excellence and equity in transportation planning and engineering empowers him to assess projects from varied perspectives, ensuring the delivery of optimal solutions and has significantly contributed to advancements in traffic analysis.

RELEVANT PROJECT EXPERIENCE
ƒ City of Vista Traffic Engineering On-Call, Vista, CA: Contract Manager – For well over a decade, staff at CRA have provided traffic engineering support to the City of Vista. Assignments have included HSIP projects, traffic impact analyses for new development proposals, peer review, roadway speed studies, parking assessments, roadway operational and circulation studies, interchange improvements, traffic calming, and roadway design standards. Contributions have also included briefings and presentations to City Council/Planning Commission. Today, we continue to provide and communicate our expertise with the City as a trusted and reliable resource.
ƒ City of San Marcos Traffic Engineering On-Call, San Marcos, CA: Contract Manager – CRA is providing the City of San Marcos with a variety of traffic engineering services. Task orders under this contract included the preparation and peer review of traffic studies and operational analyses, signal timing updates, an adaptive signal pilot program, TMC construction management, cycle track feasibility studies and alternatives development, cost estimates, ITS evaluations, safety analysis and countermeasure development, traffic calming evaluation and design, traffic engineering standards and guidelines development and manual updates, grant writing, plan checks, traffic calming guideline, TDM ordinance evaluation, staff report preparation and presentations to the Traffic Commission and City Council. ƒ City of San Diego Traffic Engineering As-Needed Services, San Diego, CA:

Task Order Manager – CRA is currently providing as-needed (second term) traffic engineering services for the City of San Diego Planning Department.

Task orders from this contract focus on long-range mobility planning projects including mobility element updates, corridor studies, policy development and mobility research projects, as well as conceptual design and roundabout feasibility. At the core of our approach to each task order is an emphasis on multimodal mobility – ensuring that each mode is considered, evaluated and planned for. Working closely with City staff, CRA provided transportation planning services under this contract for communitywide efforts (circulation/ mobility element updates, parking studies, etc.), corridor projects, and sitespecific assessments.

EXPERIENCE
17 years

EDUCATION
BS, Civil Engineering,
San Diego State
University

ACCREDITATIONS
Professional Engineer
(Traffic), California
#TR2660

AFFILIATIONS
Institute of
Transportation
Engineers (ITE)
Past President – 2023
President – 2022
San Diego ITE Mobility
Task Force
San Diego ITE Modeling
Subcommittee
Phuong Nguyen TE
Contract Manager

Page 118 of 378 ends

17.F

Page 1536 of 2581 ends

p / 17 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 4. Section II – Personnel
Phuong Nguyen resume continued
ƒ City of Solana Beach Traffic Engineering As-Needed Services, Solana Beach, CA: Contract Manager – CRA, in our third term, is providing as-needed traffic engineering services for the City of Solana Beach. Task orders from this contract have focused on conducting traffic impact assessments for City-led projects, providing peer review for traffic impact studies submitted to the City by private developers, and responding to public comments and concerns on a wide range of traffic engineering issues. ƒ Traffic Engineering Consulting Services On-Call, Oceanside Unified School District, CA: Contract Manager – As a part of this contract, CRA is providing traffic impact assessments and operations analysis in support of the modernization of existing and construction of new schools throughout the School District. These projects include Oceanside Unified School District Office Modernization, Reynold Elementary Construction and Modernization, Surfside Educational Academy Modernization, and North Terrace Elementary Improvements. ƒ Coachella Valley Arts & Music Line, Coachella Valley, CA: Lead Traffic Engineer – CRA is working on the conceptual design and preliminary engineering for this 10-mile interactive bikeway that traverses the cities of Coachella, Indio, La Quinta, and unincorporated Riverside County. The Arts & Music Line will feature sections of on-street one-way and two-way protected bikeways (Class IV) and off-street shared use paths (Class I). CRA’s transportation operations and civil design engineers are assessing various traffic scenarios at intersections to inform the safest possible bicycle facility design while balancing impacts to vehicular operations. The design incorporates fully protected bicycle movements at all signalized intersections, where it is feasible. ƒ Transportation Demand Management (TDM) Evaluation and SB-743 Compliance Analysis, Otay Ranch Resort Village, Chula Vista, CA: Project Manager – A comprehensive transportation impact study was conducted by CRA for the Resort Village project, including evaluation of the project’s Transportation Demand Management (TDM) program, as well as determining whether the project would follow the recently adopted SB 743. VMT per capita and VMT per employee were evaluated using the SANDAG Series 13 Regional Transportation Model. TDM effectiveness was evaluated using the California Air Pollution Control Officers Association (CAPCOA) “Quantifying Greenhouse Gas Mitigation Measures” report. ƒ Chula Vista Downtown Parking Management Study, Chula Vista, CA: Project Manager – CRA prepared a parking analysis and parking management plan for the City of Chula Vista’s 180-acre downtown parking district. As a part of the Study, CRA evaluated existing parking demand (inventorying parking supply and collecting occupancy) and estimated future parking generation and associated impacts based on anticipated development scenarios using the firm’s innovative Destination-based Occupancy technical approach. CRA also made adjustment recommendations to Chula Vista’s in-lieu fee program and parking and transportation demand management measures to accommodate future parking conditions. Chula Vista recently enacted temporary measures to allow on-street outdoor dining, and CRA assessed the impacts to parking from this program and assisted with the development of a permanent outdoor dining structure ordinance. ƒ West Hollywood On-Call Parking Services, West Hollywood, CA: Project Manager – As a part of this parking on-call services contract, CRA conducts parking management studies for two parking districts within the city.

The studies include monitoring the parking supply, occupancy, and enforcement; and updating the in-lieu fee programs for each parking district. CRA evaluates parking demand (inventorying parking supply and collecting occupancy) using the firm’s innovative Destination-based Occupancy technical approach. This approach was also used to optimize the siting of signage directing visitors to parking options and Electric Vehicle (EV) charging stations. The study is a part of a five-year contract with biannual updates to reflect changes in mobility patterns. Additional components include app-based parking reservation evaluation and implementation, and other next-gen technology research.

Page 119 of 378 ends

17.F

Page 1537 of 2581 ends

p / 18 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 4. Section II – Personnel
Key Personnel Biography Relevant Projects
Monique Chen, TE
Principal-in-Charge +
QA/QC
Years of Experience: 26
BS, Civil Engineering,
University of Arizona,
Tucson
Monique, a founding Principal at CRA,
is an award-winning project manager
who has led numerous mobility planning
and engineering projects where active
transportation and safety play a significant
role in recommendation development.

As a registered engineer and seasoned
mobility planner, or “plan-gineer,” Monique
has overseen dozens complex and
multidisciplinary projects ranging from active
transportation plans, safety studies, mobility
elements, corridor studies, transportation
impact analyses, operational and demand
assessments, and conceptual engineering,
as well as master plans and specific plans.

Enthusiastic, supportive, and strategic,
Monique has amassed a wealth of experience
(25+ years) providing active transportation
and multimodal planning and engineering
leadership and services to both public and
private sector clients.
 Wildomar General Plan Update – Project
Manager
 Wildomar Active Transportation Plan – Project
Manager
 SCAG Transportation On-Call – Contract
Manager
 LA Metro Active Transport, Transit and First/
Last Mile Program, Cycle 1 Corridors: Avalon/
MLK/Gage and Redondo Beach Blvd - Project
Manager
 LADOT Vision Zero 2017 Priority Corridors –
Project Manager
 City of San Diego Traffic Engineering On-Call
for the Planning Department – Contract
Manager and Task Order Manager
 SANDAG Planning On-Call – Contract Manager
and Task Order Manager
 I-8 Corridor Comprehensive Multimodal
Corridor Plan (CMCP) – Deputy Project
Manager
 24th St Trolley Station TOD Overlay – Project
Manager
 LA Metro Countywide Transportation Planning
& Development Bench, Sustainability/Active
Transportation – Contract Manager and Task
Order Manager
 City of Anaheim Transportation Planning
On-Call – Contract Manager
Tomo Takahashi, PE
Key Staff for Traffic
Engineering Design
Years of Experience: 18
BS, Civil Engineering,
Arizona State University
A Senior Traffic Engineer at CRA, Tomo is
renowned for his proficiency in identifying
innovative solutions for traffic signals, lighting,
signing and striping, temporary traffic control,
and Intelligent Transportation Systems (ITS).

With a portfolio encompassing projects such
as bikeways, roundabouts, traffic circles,
express lanes, ADA upgrades, and signal
interconnect systems, he has demonstrated
his expertise in delivering high-impact traffic
design solutions. His experience in traffic
design spans the Southern California region.

Tomo brings to every project an exceptional
attention to detail that enables him to
navigate and resolve design and construction
complexities with precision and timeliness.
 Arts and Music Line, Coachella Valley
Association of Governments (CVAG), La
Quinta, Indio, and Coachella, CA.
 SR-91 Eastbound Corridor Operations Project,
Corona, CA
 I-15 Express Lanes Project south extension,
Corona, Lake Elsinore, CA
 SANDAG University Bikeway – Traffic
Design Engineer
 City of San Marcos Traffic Engineering
On-Call, San Marcos, CA – Task Order Lead

Page 120 of 378 ends

17.F

Page 1538 of 2581 ends

p / 19 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 4. Section II – Personnel
Key Personnel Biography Relevant Projects
Jerard Madrigal, TE
Key Staff for Traffic
Engineering Design
Years of Experience: 13
BS, Civil Engineering, San
Diego State University
Jerard is a Senior Traffic Engineer with 14
years of experience in transportation, traffic
engineering, and intelligent transportation
systems (ITS) projects. Prior to joining the
CRA team, he worked for several public
agencies where he gained expertise in
working with traffic controllers in the field
as well as responding to public requests.

His diverse work experience includes traffic
engineering studies, safety analysis, signal
timing, grant writing, traffic signal and ITS
system operations, including traffic signal
design and construction. Simultaneously
resolute and cheerful, Jerard has led and
assisted on transportation projects involving
protected intersections, signing, and striping
improvements, traffic signals, and fiber optics
design.
 CVAG Arts & Music Line Non-Infrastructure
Program, Coachella Valley, CA – Traffic Signal
Task Lead
 Inland Rail Trail Phase 4 – Traffic Signal and
Lighting Task Lead
 College Boulevard Widening Project in
Oceanside – Traffic Signal and Lighting Task
Lead
 Southbay Bus Rapid Transit Project – Traffic
Signal Systems Engineer Lead*
 Installation of Adaptive Traffic Control System
– Led design and implementation of a new
signal adaptive system*
 Installation of Pedestrian Countdown Signals
Citywide – Project Engineer*
*While working for the City of Chula Vista
Jonathan Sanchez, PE,

TE, PTOE
Key Staff for Traffic
Engineering Support
Years of Experience: 10
MS, Civil (Transportation)
Engineering, San Diego
State University
BS, Civil Engineering, San
Diego State University
Jonathan is a Senior Traffic Engineer with 10
years of experience with traffic impact studies,
traffic engineering design plans, conceptual
design, traffic operations, data collection,
collision analyses, corridor studies, and
multi-modal analysis. His expertise includes
the application of transportation planning and
traffic engineering analysis software including
Synchro, VISSIM, and Highway Capacity
Software (HCS). Jonathan’s fluency in Spanish
has contributed to CRA’s translation services
for community outreach events. An excellent
communicator with an ability to put people
at ease in a wide range of situations, he is
supportive and inclusive, always taking the
time to listen to others’ ideas. These traits
make Jonathan a great leader, co-worker, and
mentor, whose clients feel comfortable and
eager to collaborate with him.
 Wildomar General Plan Update – Deputy
Project Manager
 Wildomar Active Transportation Plan – Lead
Traffic Engineer
 Southern California Edison On-Call – Contract
Manager
 La Mesa Traffic Engineering On-Call – Task
Order Manager, Lead Traffic Studies
 San Marcos Traffic Engineering On-Call – Task
Order Manager
 Vista Traffic Engineering On-Call – Task Order
Manager, Lead Traffic Studies
 El Centro General Plan Update and Traffic
Impact Study Guidelines – Deputy Project
Manager
 City of Solana Beach Traffic Engineering
On-Call – Task Order Manager, Lead Traffic
Studies
Laura Hernandez, PE
Traffic Engineering Design
Years of Experience: 6
BS, Civil Engineering,
California Polytechnic State
University, San Luis Obispo
Laura is a transportation engineer who assists
project managers and senior engineers
with traffic and civil engineering design. Her
transportation experience has been focused on
bikeway improvements, traffic signal/electrical
design, signing/striping design, and utility
research/utility coordination. She is proficient
with AutoCAD/Civil 3D, photometric analysis,
and plan production. Laura has exceptional
communication and organizational skills.
 Downtown Cycle Track Network Wayfinding and
Cortez Hill Pedestrian Wayfinding, Civic San
Diego, CA – Transportation Analyst
 West 19th Street Greenway, City of National
City, National City, CA – Civil Engineer, Utility
Coordinator
 City-Wide Pedestrian Safety Enhancements,
City of National City, National City, CA – Utility
Coordinator
 Arts and Music Line, Coachella Valley
Association of Governments (CVAG), La
Quinta, Indio, and Coachella, CA – Traffic
Engineer
 SANDAG University Bikeway – Traffic Design
Engineer

Page 121 of 378 ends

17.F

Page 1539 of 2581 ends

p / 20 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 4. Section II – Personnel
Key Personnel Biography Relevant Projects
Alyssa Foley, PE
Traffic Engineering Design
and Staff Support
Years of Experience: 6
BS, Environmental
Engineering, San Diego
State University
Alyssa’s experience in transportation
engineering and transportation planning
includes the production of design plans,
signing and striping, temporary traffic control,
roadway improvements, traffic signals, and
street lighting for various roadway, bikeway,
and multi-use path projects. Alyssa has
worked for public agencies and private clients
throughout Southern California and across the
US. Her extensive skillset includes AutoCAD,
Vehicle Tracking, Microstation, ArcGIS, and
Synchro & Simtraffic.
 Oakdale Alameda Improvements, El Cajon,
CA - Civil Engineer
 Arts and Music Line, Coachella Valley
Association of Governments (CVAG),
La Quinta, Indio, and Coachella, CA - Traffic
Engineer
 SR-91 Eastbound Corridor Operations Project,
Corona, CA - Traffic Engineer
 Civic Center Bikeway, South El Monte, CA -
Project Engineer
 LA Metro G Line (Orange) Bus Rapid Transit
Improvements, Los Angeles, CA - Traffic
Engineer*
*Previous work experience
Joseph Perez, EIT
Traffic Engineering Studies
and Staff Support
Years of Experience: 6
BS, Civil Engineering, City
Planning, San Diego State
University
Joey is a Traffic Engineer with six years of
experience providing general and technical
support for traffic impact studies, traffic
operations analyses, data collection, collision
analyses, corridor studies, and multi-modal
analysis as they relate to community plans and
development projects. Joey has contributed
to traffic impact analysis reports, community
plan updates, technical memorandums, and
mobility access studies. He is proficient in the
use of traffic operations analysis software,
which includes Synchro, Simtraffic, Highway
Capacity Software (HCS), and ArcMap. Joey
has also assisted with developing modeling
scenarios, including the SANDAG Series
14 ABM2+ model, to forecast future year
traffic patterns and deliver accurate results
to stakeholders. Clients like working with
Joey because he prioritizes a complete
understanding of their demands and needs, is
reliably responsive, and sets high standards
for the work he undertakes.
 North Harbor Drive Mobility & Access Study –
Traffic Engineer
 LA Metro Active Transport, Transit and First/
Last Mile Program, Cycle 1 Corridors: Avalon/
MLK/Gage and Redondo Beach Blvd – Traffic
Engineer
 San Marcos Traffic Engineering On-Call –
Traffic Engineer
 Vista Traffic Engineering On-Call – Traffic
Engineer
 Ontario Euclid Avenue SSARP – Traffic
Engineer
 Clairemont Community Plan Update – Traffic
Engineer
Tyler Rausch, EIT
Traffic Engineering Design
and Staff Support
Years of Experience: 8
BS, Civil Engineering,
University of WisconsinMadison
Tyler is a Traffic Engineer with seven years
of experience in transportation planning and
engineering for infrastructure projects and
active transportation planning and design. A
strategic thinker with an amicable disposition
and a reputation as a dependable collaborator,
Tyler’s accomplishments include corridor
design, multi-use trail planning, cycle-track
planning, signal and fiber optic design,
lighting design and photometric analysis. He
is proficient with AutoCAD, Civil 3D, AutoTurn
Analysis, Adobe Acrobat Professional,
GuideSign, Microstation, and photometric
analysis software.
 Torrey Pines Fire Station: Traffic Design
Engineer
 SANDAG University Bikeway – Traffic Design
Engineer
 Lemon Grove Connect Main Street Phases
1-3 – Traffic Design Engineer
 Bayshore Bikeway – Barrio Logan Segment –
Traffic Design Engineer
 Envision SR 86 – Traffic Engineer La Mesa
Traffic Engineering On-Call – Traffic Design
Engineer

Page 122 of 378 ends

17.F

Page 1540 of 2581 ends

p / 21 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118 4. Section II – Personnel
Key Personnel Biography Relevant Projects
Cristian Belmudez
Traffic Engineering Studies
and Staff Support
Years of Experience: 6
BS, Civil Engineering, San
Diego State University
Cristian is a Traffic Engineer with five
years of experience providing general and
technical support for traffic impact studies,
traffic operations, data collection, collision
analyses, corridor studies, and multi-modal
analyses as they relate to community plans
and development projects. He has developed
technical tools and software that facilitate
project workflow and the delivery of precise
information to clients. Cristian’s experience
includes traffic analyses for circulation
elements, general plan updates, and active
transportation plans. He is proficient in
Synchro and Big Data usage (Replica) and
has advanced knowledge in Excel and GIS.

Cristian’s relationship-building ability and
capacity for effective guidance makes him
a great team leader and collaborator. He
is an excellent communicator and skilled
public speaker, contributing to community
outreach for active transportation projects
in both English and Spanish, and facilitating
collaborations with Hispanic/Latino/a
communities.
 La Mesa Boulevard Complete Streets Plan
Segments 1 & 2, La Mesa, CA: Project
Manager
 City of San Diego Complete Streets Design
Guidelines, San Diego, CA – Project Manager
 Solana Beach Safe Routes to School Plan,
Solana Beach, CA – Project Manager
 L.A. Metro Complete Streets Training, Los
Angeles, CA – Project Manager
 CVAG Arts & Music Line Non-Infrastructure
Program, Coachella Valley, CA – Project
Manager
 Numerous grant applications such as ATP,
HSIP, Sustainable Communities, SS4A, etc.

Jackson Schulz
Traffic Engineering Studies
and Staff Support
Years of Experience: 3
BS, Civil Engineering,
California State Polytechnic
University, Pomona
Jackson Schulz is a junior traffic engineering
analyst. He provides support on traffic
engineering and transportation planning
projects such as general plans, specific
plans, as-needed traffic engineering services,
and development projects in the southern
California region. Jackson has assisted in
tasks related to the preparation of traffic impact
analysis reports, community plan updates,
technical memorandums, and mobility access
studies. He is proficient in use of traffic
operations software, which includes Synchro, ,
autoCAD, Highway Capacity Software (HCS),
and ArcMap.
 Wildomar General Plan Update, Wildomar, CA
 Mikasa Multi-Family Development, Riverside,
CA
 City of San Marcos On-Call Traffic Engineering
and Support Services, San Marcos, CA
 City of San Diego Traffic Engineering
As-Needed Services, San Diego, CA
 City of Vista Traffic Engineering On-Call, Vista,
CA
Jesus Martinez
Traffic Engineering Studies
and Staff Support
Years of Experience: 2
BS, Civil Engineering,
San Diego State University
Jesus Martinez is a junior traffic engineering
analyst. He provides support on traffic
engineering and transportation planning
projects such as community plans, as-needed
traffic engineering services, and development
projects in the San Diego region. Jesus has
assisted in tasks related to the preparation
of traffic impact analysis reports, community
plan updates, technical memorandums, and
mobility access studies. He is proficient in use
of traffic operations software, which includes
Synchro, Traffix, Highway Capacity Software
(HCS), and ArcMap.
 City of San Marcos On-Call Traffic Engineering
and Support Services, San Marcos, CA
 Traffic Engineering Consulting Services
On-Call, Oceanside Unified School District,
Oceanside, CA
 City of San Diego Traffic Engineering
As-Needed Services, San Diego, CA
 City of Vista Traffic Engineering On-Call, Vista,
CA

Page 123 of 378 ends

17.F

Page 1541 of 2581 ends

p / 22 CITY OF HEMET

ON-CALL SERVICES FOR TRAFFIC ENGINEERING SERVICES
CRA P#2024.118

5. Section III – Fee Schedule
As requested in the RFP, the fee schedule has been uploaded and provided as a separate file.

Page 124 of 378 ends

17.F

Page 1542 of 2581 ends

SAN DIEGO
3900 Fifth Avenue, Suite 310
San Diego, CA 92103

ASSOCIATES ASSOCIATES

Page 125 of 378 ends

17.F

Page 1543 of 2581 ends

1 PROPOSAL FOR:

CITY OF HEMET

ON-CALL SERVICES

FOR TRAFFIC

ENGINEERING
JULY 17, 2024
SUBMITTED BY: General
Technologies and Solutions

Page 126 of 378 ends

17.F

Page 1544 of 2581 ends

1 The City of Hemet seeks a multidisciplinary consultant team to provide traffic engineering services on an on-call basis.

Our proposal outlines the qualifications of our traffic engineers and designers, demonstrates our understanding and familiarity with the scope of work, and documents our past performance and record of experience with respect to the type of traffic engineering activities anticipated under this contract. Our response to the Request for Proposal (RFP) includes our firm experience including references, organization chart and key personnel’s experience, similar projects and services, and fee schedule.

With a proven track record with local agencies throughout Southern California and areas in close proximity to City of Hemet providing traffic engineering services under similar on-call contracts and a diverse portfolio of work throughout the region, we, at GTS can serve as a seamless partner to the city under this contract. We have built relationships through quality traffic engineering services locally and have the depth of resources required for any assignment under this contract including a mix of engineers and designers. All traffic engineering services will be performed by GTS’ California staff, with quality control and quality assurance provided locally too.

I will be your project manager and main point of contact for this project and will manage and coordinate the activities of our proposed team. Myself and my team have served in similar capacities for various cities most recently for the City of Rancho Palos Verdes (helping with traffic calming, intersection analysis, and plan reviews), City of Hermosa Beach (assisting with traffic engineering designs and studies), City of Commerce (delivering on traffic analysis and preparing HSIP and ATP grant applications), City of Glendora (carrying out signal warrant analysis), City of Buena Park (peer reviewing signal synchronization plans), and City of Irvine (assisting with adaptive signal control and probe data analysis), among several others.

Our personnel will serve as an extension of the City of Hemet’s staff and are ready to hit the ground running from their existing experience on traffic engineering on-call contracts in nearby cities. Our team looks forward to the city’s review of our submittal and building a working relationship with your public works department. If you require additional information, please contact me via the phone 213.532.8221 or email at [email protected].

I, Rawad Hani bind this proposal contractually on behalf of my firm GTS. We do not take any exceptions to the RFP and have reviewed all addendums and Q&A. If you need information in addition to our submittal, please feel free to contact me at any time at my phone and email noted above. We appreciate your consideration of the GTS team and look forward to working with the City of Hemet.

Sincerely,
Rawad Hani, PE, TE
City of Hemet
Purchasing Division
Attn: Candace Sunds
SUBJECT: Proposal - City of Hemet On-Call for Traffic Engineering Services Dear Candace Sunds and City of Hemet Selection Committee:

Page 127 of 378 ends

17.F

Page 1545 of 2581 ends

CONTENTS

TABLE OF
Section I - Experience 2 - 4
Section II - Personnel 5 - 13
Section III – Fee Schedule N/A

Page 128 of 378 ends

17.F

Page 1546 of 2581 ends

2 2
Experience
General Technologies and Solutions (GTS)
www.gentecsol.com
GTS provides mobility solutions for all road uses: pedestrian, bicycle, transit, auto, and freight modes.

We employ state-of-the-art technologies to provide innovation in:
» Traffic Engineering
» Systems Engineering
» Multi-modal Planning
» Parking
GTS was established with the goal of helping public agencies leverage advanced technology in transportation. We believe in the power of technology to effect meaningful change in our local neighborhoods and communities. Smart cities are the future, offering unlimited opportunities for smart government technology. GTS brings together our understanding of smart technology solutions (what’s on the horizon) with community needs and goals (what’s in demand).

At GTS results matter as much as the way getting there. We support our clients throughout the whole project lifecycle, including communicating mobility initiatives, technology goals, and strategies to stakeholders at all levels.

GTS currently works across Southern California from Los Angeles County to Los Angeles Metro (leading the Strategy development for the Regional Integration for Intelligent Transportation Systems - RIITS and the Local All-Hazard Mitigation Plan) to Caltrans, LADOT, Coachella Valley Association of Governments (CVAG), Riverside County and the cities of Lake Elsinore, Moreno Valley, Cathedral City, San Bernardino, Buena Park, Irvine, Santa Monica, Torrance, Pomona, Hermosa Beach, Moorpark, Glendale, and Burbank among others on transportation engineering design and planning tasks ranging from grant applications to smart city solutions, revitalization plans, systems engineering, safety studies, traffic calming, signing and striping, traffic signal design and modification, and data analytics among others.

GTS has served in similar capacities for various cities most recently for the City of Rancho Palos Verdes (supporting on traffic calming, school access, intersection analysis, plan review among others), the City of Hermosa Beach (providing traffic engineering designs and studies), and California State University Dominguez Hills (supporting on campus-wide traffic analysis and parking). Our project manager for this on-call has also served many cities on an on-call basis; Rawad worked with the City of Commerce (delivering on traffic analysis and preparing HSIP and ATP grant applications), City of Glendora (carrying out signal warrant analysis), City of Buena Park (peer reviewing signal synchronization plans), City of Irvine (assisting with adaptive signal control and probe data analysis), and City of West Hollywood (carrying out parking studies) among several others.

Page 129 of 378 ends

17.F

Page 1547 of 2581 ends

3 3
City of Rancho Palos Verdes Transportation and Traffic Engineering On-Call (2021 - Ongoing)
GTS is providing transportation and traffic engineering on-call services to the City of Rancho Palos Verdes. GTS worked with the City on the traffic signal design review at the intersection of Palos Verdes Drive E & Palos Verdes Drive S. The scope includes presenting recommendations to enhance the aesthetics at said location by presenting features that better blend with the surroundings.

GTS also assisted with the traffic engineering and circulation analysis for several schools in Rancho Palos Verdes (Silver Spur Elementary, Soleado Elementary, Ridgecrest Intermediate, and Vista Grande Elementary). Our scope of work included working jointly with the City and the schools to confirm the current challenges through site observations of the drop-off and pick-up areas and surrounding streets, analysis of the prevailing conditions and providing recommendations for improvement, and documentation of findings. The results of the analysis will be consolidated in single circulation plan/flyer that can be distributed to families and staff.

Project Amount: $45,000
Contracting Agency: City of Rancho Palos Verdes
Reference Information: Ramzi Awwad | Public Works Director | 30940 Hawthorne Boulevard, Rancho Palos Verdes, CA 90275 | [email protected] | 310.544.5275 City of Lake Elsinore, Traffic Signal Modification Design Central Ave (SR 74) and Ardenwood Way (2021 - Ongoing)
GTS is providing traffic engineering signal upgrade services for the signalized intersection of Central Ave (SR 74) and Ardenwood Way in the City of Lake Elsinore. GTS is carrying out various safety, operational, and accessibility upgrades as part of this design. This project will accommodate the SR74 road widening from 4 to 6 lanes, provide safety improvements for road users and pedestrians, and design ADA-compliant curb ramps. The design services include coordination with the City and the County (which has shared jurisdiction at the intersection).

Project Amount: $13,000
Client: Karaki WS
Reference Information: Florentino Mendoza | Project Manager | 4887 E La Palma Avenue, Suite 707, Anaheim, CA 92807 | [email protected] | 714.695.9300 Date Palm and Victoria Street Conceptual Design, Cathedral City, CA (2021 - 2021) As part of the conditions of approval for a new gas station at the southeast corner of the Date Palm Drive and Victoria Drive intersection, GTS provided conceptual design support services for the project team. GTS reviewed the proposed site plans, previous traffic impact study report, asbuilts, the City’s approval conditions, and other relevant documents. A turning templates (Auto-Turn) analysis of a fuel truck accessing the site was also developed. Based on the initial findings, two concepts were proposed for the project frontage area that included a signal modification and widening of the Victoria Dr. The conceptual plans and costs for the two options were developed and presented along with the pros and cons of each concept.

Project Amount: $22,000
Client: The Altum Group
Reference Information: Rich Malacoff | Project Manager | 44-600 Village Court, Suite 100, Palm Desert, CA 92260 | [email protected] | 760.346.4750

Page 130 of 378 ends

17.F

Page 1548 of 2581 ends

4 4
City of San Bernardino Traffic Signal Upgrade PS&E Services (2019 - 2021) GTS provided traffic engineering signal upgrade services for 40 of the 224 signalized intersections in the City of San Bernardino where various safety, operational, and accessibility upgrades are required. This HSIP-funded project will replace or install new equipment to the existing traffic signal system which include traffic signal head improvements, pedestrian signal head improvements, and pedestrian pushbutton improvements among others.

Project Amount: $50,000
Contracting Agency: City of San Bernardino (GTS is a sub to Kimley-Horn) Reference Information: Azzam Jabsheh | City Traffic Engineer | 290 North D Street, San Bernardino, CA 92401 | [email protected] | 909.384.7272
Vehicle Miles Traveled (VMT) Analysis for Village Specific Plan, Town of Apple Valley (2021 - 2021)
GTS developed the vehicle miles traveled (VMT) analysis for the proposed Village Specific Plan in the Town of Apple Valley, San Bernardino County, CA. The project encompasses multiple parcels north and south of State Highway 18 between Navajo Rd and Central Rd. The project area is divided into 5 planning areas each consisting of one or more planning Traffic Analysis Zones (TAZs). The project primarily consists of non-residential land uses – retail, office, and industrial and some multifamily residential. The VMT analysis demonstrated that while the vehicle miles traveled per employees only shows a slight significant impact, the project has no significant impact with inclusion of number of customers in the service population estimates which is the widely used and reasonable efficiency metric. GTS also assessed the project OD (origin-destination) VMT per service population in cumulative conditions and noted cost effective mitigation measures from the most recent California Air Pollution Control Officers Association (CAPCOA) manual to offset the VMT impact.

Project Amount: $12,000
Client: David Evans and Associates, Inc.

Reference Information: James M. Daisa | Project Manager | 201 S Figueroa Street, Suite 240, Los Angeles, CA 90012 | [email protected] | 909.912.7304 VMT Analysis of Mariposa Road/Fashion Court Commercial
Development, Hesperia, CA (2021 - 2021)
GTS performed the vehicle miles traveled (VMT) analysis for the Mariposa Road / Fashion Court commercial development project located on two sites to the southwest and southeast corners of Mariposa Road and Fashion Court intersection in the City of Hesperia. The project proposes to construct a McDonalds, a drive through restaurants, retail and quality sit-down restaurants. This VMT analysis evaluated the project using the 2016 and 2040 model years obtained from the San Bernardino County Transportation Authority (SBCTA).

Although this project can be screened out for VMT analysis based on its size (less than 50,000 SF) per the City’s Traffic Impact Analysis Guidelines for Vehicle Miles Traveled (VMT), a detailed VMT analysis was carried out to accommodate for the non-local trips given the proximity to the freeway.

The analysis demonstrated that while the vehicle miles traveled per employees only shows a significant impact, the project has no significant impact with inclusion of number of customers in the service population estimates which is the widely used and reasonable efficiency metric.

Project Amount: $10,000
Client: David Evans and Associates, Inc.

Reference Information: James M. Daisa | Project Manager | 201 S Figueroa Street, Suite 240, Los Angeles, CA 90012 | [email protected] | 909.912.7304

Page 131 of 378 ends

17.F

Page 1549 of 2581 ends

5 5
Personnel
The following is a brief introduction to the key personnel. Our labor resources are fully adequate to meet the demands of the project. Key personnel will be available to the extent proposed for the duration of the project. GTS acknowledges that no person designated as “key” to the project shall be removed or replaced without the prior written concurrence of the City. An organizational chart and one-page resumes are presented in the following pages.

Rawad Hani, PE, TE, RSP1, PTOE | Role: Project Manager
Rawad is a licensed civil and traffic engineer with over 22 years of experience in traffic engineering and transportation planning. Rawad carried out various projects similar in scope to the project under consideration and understands the importance of communications and timely follow through the success of on-call projects. He will have overall responsibility for the work, work with the City as the main point of contact for this project, and manage day-to-day activities of the project team.

Chaouki A. Hosn, EE | Role: Electrical Engineer
Chaouki is a registered electrical engineer with over 34 years of experience working with the private and public sectors, specializing in high and low voltage design for infrastructure projects. Chaouki will lead on any EV charging and street lighting tasks as needed.

Rock Miller, PE, TE, PTOE (Subconsultant) | Role: Signal Timing, Transportation & Outreach Rock is a registered civil and traffic engineer with more than 45 years of transportation planning, design, and operations experience. As an extension to our team, Rock will build on his expertise in signal timing and active transportation planning with similar projects to advise on the pedestrian, bicycle, and safety planning and design aspects, and will support in reviewing final plans and public engagement/outreach.

Patrick Armijo, PE, PEng | Role: Signal Operations
Patrick is a professional engineer with 30 years of experience exclusively in traffic signal systems, operations, and signal timings. Patrick will provide signal systems engineering expertise building on his many years of experience working with state and local governments.

Ariel Godwin, AICP | Role: Senior Planner
Ariel is a certified urban and regional planner with over 16 years of experience in community planning, transportation/mobility planning, design, GIS, and project management. Ariel has worked on a wide variety of projects from Complete Streets policy development to congestion management strategies, and will lead on traffic analysis tasks.

Sabrina Mamo | Role: Senior Engineer
Sabrina is an accomplished traffic engineer specializing in traffic signals, traffic control/MPT, roadway design, specialized signage conceptual design, alternative analysis, project management, data collection, report writing, traffic analysis, and team management. Sabrina will provide traffic engineering and design services.

Rudy Garcia, EIT | Role: Traffic Analysis
Rudy is an experienced transportation engineer with more than 10 years of experience in the design and studies of transportation systems, specializing in traffic impact studies, parking, and feasibility studies. Rudy will support on traffic analysis tasks.

Page 132 of 378 ends

17.F

Page 1550 of 2581 ends

6 6
City of
Hemet PROJECT

MANAGER
Cassandra Garcia, EIT | Role: Design Engineer
Cassandra will provide traffic engineering and design services ranging from signal designs to signing and striping, traffic control plans, and street lighting.

Ryan Meller | Role: Transportation Planner
Ryan will provide transportation planning support services on traffic impact studies and VMT analysis.

April Krawiec, EIT | Role: Design Engineer
April is a transportation engineer who has worked on projects across Southern California, carrying out traffic signal design, pavement delineation plans, signing & striping plans, and ITS plans, among others.

An organization chart and one-page resume of each of our key team members are included next.

Organizational Chart
Rawad Hani*
PE, TE, PTP, PTOE, RSP1

PROJECT MANAGER
Sabrina Mamo SENIOR TRANSPORTATION

ENGINEER
Rock Miller*

PE, TE, PTOE

SIGNAL TIMING,

TRANSPORTATION
& OUTREACH
Patrick Armijo*
PE, PEng

SIGNAL OPERATIONS
Ariel
Godwin
AICP

SENIOR PLANNER
Chaouki A. Hosn*
EE

ELECTRICAL ENGINEER
Cassandra Garcia
EIT

DESIGN ENGINEER
April Krawiec EIT DESIGN ENGINEER
Ryan Meller TRANSPORTATION

PLANNER
Rudy Garcia
EIT

TRAFFIC ANALYSIS

Page 133 of 378 ends

17.F

Page 1551 of 2581 ends

7 7

PROFILE
Rawad is a traffic engineer and transportation planner with over 22 years of experience. He specializes in traffic engineering, parking analysis, demand modeling, and technology applications. Rawad has managed engineering design projects in the US and internationally where he advised public, private, and institutional clients. His recent experience includes assisting local governments across Southern California with transportation plans, traffic studies, parking management strategies, and signal and street lighting designs. His on-call project experience includes the cities of Hermosa Beach, Irvine, Buena Park, Commerce, Santa Monica, and Glendora among others.

Rawad understands the importance of striking the right balance between engineering (mobility and safety) and planning (livability and sustainability) considerations.

EXPERIENCE
• Seaton Avenue and Perry Street Traffic Design, Riverside County • Ramona Expressway and Brennan Avenue Traffic Design Services, City of Perris
• Date Palm and Victoria Street Conceptual Design, Cathedral City, CA • Traffic Signal Modification Design of Palm Avenue and W Esplanade Avenue, San Jacinto/Hemet, CA
• Wildomar Crossroads Traffic Engineering Design Services, City of Wildomar
• Traffic Signal Modification Design Central Ave (SR 74) and Ardenwood Way, City of Lake Elsinore
• City of Rancho Palos Verdes Transportation and Traffic Engineering OnCall, Rancho Palos Verdes, CA • Hermosa Beach On-Call Traffic Control Plans and Striping, City of Hermosa Beach On-Call
• City of Commerce MixMaster Analysis and Alternatives Design, City of Commerce On-Call
• Foothill Blvd and Oak Tree Dr Warrant Analysis, City of Glendora On-Call • Artesia Blvd and Knott Ave Signal Synchronization Review, City of Buena Park On-Call
• City of Hawthorne, On-Call Warrant Analysis, Traffic Signal Design and Feasibility Study
• City of La Habra Heights Traffic Calming Analysis
• City of West Hollywood, Melrose Design District Fiber Communications and Smart City Design Services
• City of Norwalk Rosecrans Ave and San Antonio Dr Traffic Control Plans • City of Commerce ATP and HSIP Grant Applications, Commerce, CA • 20th Street Pedestrian and Bicycle Connection (ATP), City of Santa Monica/ Caltrans
• San Bernardino Traffic Signal Upgrade PS&E Services (HSIP), San Bernardino, CA
RAWAD HANI PE, TE, RSP1, PTOE

PROJECT MANAGER

EDUCATION
• BE Civil Engineering,
American University
• MS Civil Engineering,
American University

REGISTRATIONS
• Civil Engineer in CA
• Traffic Engineer in CA
• PTOE - Professional Traffic
Operations Engineer
• PTP - Professional
Transportation Planner
• RSP1 - Road Safety
Professional 1

AREAS OF EXPERTISE
• Traffic Engineering
• Parking Analysis
• Transportation Planning
• Transportation Technology
Applications

Page 134 of 378 ends

17.F

Page 1552 of 2581 ends

8 8

PROFILE
Chaouki is a California registered Electrical Engineer, specializing in high and low voltage design for infrastructure projects. His experience includes street lighting design, lighting photometric, communication infrastructure, dry utility services as well as the electrical design for parking lots lighting design.

He has designed several electric vehicle charging stations as well as electrical infrastructure designs for commercial, industrial facilities, and residential facilities. Chaouki has over 34 years of experience working with the private and public sectors mostly with the City of Los Angeles Harbor Department and as such he understands first hand the demands placed on the local agency staff. He works collaboratively with utility owners and local agencies to ensure on-going communications and timely delivery of projects.

EXPERIENCE
• Emergency Shelter Parking Lot, Pomona, CA – Design Manager: Light poles layout, conduit and wires, communication, lighting photometric, load calculations, specifications, and cost estimate.
• Santa Monica 20th Street Connection, Santa Monica, CA – Electrical Design Manager: Laying out pedestrian and bicycle lighting along with complete infrastructure design, new SCE services, specifications and cost estimate. Project is in Caltrans right of way and involved working closely with Caltrans.
• Palm Ave Street Lighting Design, Upland, CA – Design Manager: street lighting improvement along Palm Ave between West 9th Street and Alpine Street in compliance with ANSI/IES RFP-8-14 roadway lighting, which includes street light poles layout, conduit and wires, communication, lighting photometric, load calculations, specifications, and cost estimate. • Melrose Complete Street Design, West Hollywood, CA – Design Manager: (12) EV charging level II stations along streets, which includes power and communication infrastructures, new SCE services and charge point platform for billing. Advising on smart pole designs. • Lincoln and Arlington Street Lighting and Undergrounding, Torrance, CA – Design Manager: utility pole relocations, undergrounding, new SCE services, load calculations.
• Navy Way Street Lighting, Port of Los Angeles – Design Engineer:
lighting and undergrounding design for the 3-mile roadway that included photometric, utility coordination, light poles layout, load calculations, specifications, and cost estimate. LED was later installed. • Various Dry utility services, SCE rule 20B, parking lot lighting, and complete electrical infrastructure for various development projects across Southern California (Pasadena, Colton, Carlsbad, San Clemente, Dana Point, Newport Beach, San Diego, Long Beach among others.) CHAOUKI A. HOSN EE

ELECTRICAL ENGINEER

EDUCATION
• BS Electrical Engineering,
University of Washington,
(Seattle, WA)

REGISTRATIONS
• Electrical Engineer in CA

AREAS OF EXPERTISE
• Street Lighting
• Power and Lighting
• Layout Design
• EV Charging Stations
• Lighting Photometric
• Dry Utility Services
• Design Management

Page 135 of 378 ends

17.F

Page 1553 of 2581 ends

9 9

PROFILE
Rock is a registered Civil Engineer and Traffic Engineer in the State of California with more than 45 years of transportation planning, design, and operations experience. He is an expert in the latest capabilities and requirements available and expected from cities and municipal governments.

For more than 25 years, Rock has been a consultant at the senior or principal level in the field of traffic engineering, traffic safety, and circulation design. He also has 10 years of public agency experience serving as City Traffic Engineer for Costa Mesa and staff traffic engineer with the County of Orange.

Rock has completed a wide variety of unique transportation projects, including traffic signals, signing and striping, street lighting, work site traffic control, traffic impact analysis, and the design of street and highway improvements. He has also prepared many transportation policy plans and completed controversial and complex transportation studies, including neighborhood traffic calming projects, complete streets, pedestrian and bicycle studies, projects anticipating litigation by another public agency, and projects with intense public opposition. Rock is a national expert in the traffic design and safety for walking and ur ban bicycling infrastructure. He has frequently been an invited speaker to regional and national conferences and committees on many topics, including pedestrian circulation, innovative bikeway design, traffic calming, and transportation policy. Rock served as International President of the 15,000 member Institute of Transportation Engineers (ITE) in 2012. He is a Professional Engineer (Civil) and Professional Engineer (Traffic) in the State of California and a Certified Professional Traffic Operations Engineer by the Institute of Transportation Engineers.

EXPERIENCE
Rock has extensive experience in leading neighborhood traffic management plans. He has led such studies for over ten communities. His role is key as the leader of public outreach efforts for this type of studies, taking advantage of his effective presentation style in public workshops and events. Some of the larger studies of this type are highlighted below and a more extensive resume can be provided upon request:
• City of La Quinta Roundabout Designs
• CV Link Multi-Purpose Trail, Coachella Valley, CA
• Rancho Mirage Bikeway Design Assistance, Rancho Mirage, CA • Berkeley Street Traffic Calming Project, Santa Monica, CA • Town of Piru Traffic Management Plan, Ventura County, CA • Fillmore River Street Traffic Circles, Fillmore, CA
• Vista Avenue Bicycle Boulevard, Long Beach, CA
• Short Range Bicycle Friendly Improvement Program, Long Beach, CA • Newport Heights Neighborhood Traffic Management Plan, Newport Beach, CA
• Los Alamitos Neighborhood Traffic Plan, Los Alamitos, CA • OC Loop Feasibility Study, Orange County, CA
• Crosswalk Safety Studies, Santa Ana, CA
• Enhanced Pedestrian Crossing Study (Phase I & II), Santa Monica, CA • Bicycle Friendly Improvements, UCLA Campus, Los Angeles, CA ROCK E. MILLER PE, TE

SIGNAL TIMING, TRANSPORTATION & OUTREACH

EDUCATION
• MS Civil Engineering,
UC Davis
• BS Civil Engineering,
UC Davis

REGISTRATIONS
• Civil Engineer in CA and HI
• Traffic Engineer in CA
• PTOE - Professional
• Traffic Operations Engineer

MEMBERSHIPS
• Voting Member, National
Committee on Uniform
Traffic Control Devices
• International President,
2012, Institute of
Transportation Engineers
• Member, Association of
Pedestrian and Bicycle
Professionals
• Member, American Society
of Civil Engineers
• Past Section and District
President, Institute of
Transportation Engineers
• Fellow, Institute of
Transportation Engineers

Page 136 of 378 ends

17.F

Page 1554 of 2581 ends

10 10

PROFILE
Patrick Armijo is a Professional Engineer with about 30 years of experience in the public and private sectors. His experience includes: municipal infrastructure management; supervising traffic signal and railroad signal operations engineering staff and signal maintenance crews; traffic signal timing; traffic signal design; traffic signal construction; ITS operations; TMC operations and design; highway design; bridge and roadway construction; railway crossing signal operations; community lighting; capital Improvement program budgeting; and writing requests for proposals.

EXPERIENCE
• Light Rail Signals Supervisor at Santa Clara Valley Transportation Authority: Plan, schedule, and supervise inspections, maintenance, and repair of signaling, crossing equipment, and rail safety systems. Conduct safety training and monitor crew performance to ensure safe work practices, procedures and compliance with FRA and CPUC regulations. Evaluate traffic signal RR preemption and crossing safety. Advise VTA on intelligent transportation systems and transit system priority.
• Technical Director, Intelligent Transportation Systems at Western Pacific Signal, San Leandro, California: Advanced Traffic Management System client liaison, advanced technical support, training, and proposal director.

Projects included adaptive traffic signal operations, transit signal priority, connected vehicle research, railroad crossing signal preemption, and traffic management center design.
• Project Manager at ADVANTEC Consulting Engineers, Irvine, California:

Traffic signal timing, traffic signal synchronization and railroad preemption signal timing: Orange County (OCTA), San Bernardino Association of Governments (SANBAG), Metropolitan Transportation Commission (MTC), Caltrans and City of Glendale.
• Traffic Signals/Railroad Signals Manager at City of Lethbridge, Alberta, Canada: Managed and supervised the traffic signal department for the City of Lethbridge. The staff included a traffic signal operations engineer, five traffic signal/railroad signal electricians. Served as Project Manager on new traffic signal designs and construction projects. Managed traffic signal synchronization projects. Supervised and approved upgrades to traffic signal infrastructure such as signal interconnect, cabinets, controllers, vehicle detection systems, emergency vehicle preemption systems, speed enforcement/red light running camera systems, and Battery Back Up units. • Traffic Signals Operations Engineer at Washington State Department of Transportation: Managed traffic signal operations for over 250 state, county, and municipal traffic signals for 18 years. Developed traffic signal timing and signal coordination plans. Conducted traffic accident analysis and recommended safety mitigation measures. Experience with transit system priority programming and traffic signal railroad preemption timing development.

PATRICK ARMIJO PE, PEng

SIGNAL OPERATIONS EXPERT

EDUCATION
• BS Civil Engineering,
California State University,
Sacramento

REGISTRATIONS
• Professional Engineer in
WA and Alberta, Canada

AREAS OF EXPERTISE
• Institute of Transportation
Engineers
• International Municipal
Signals Association

Page 137 of 378 ends

17.F

Page 1555 of 2581 ends

11 11

PROFILE
Ariel is a transportation planner with over 16 years of experience in planning, design, and project management. Throughout a career focused on multimodal planning and transportation safety, he has worked on a wide variety of projects, from Complete Streets policy development to pedestrian and bicycle plans to congestion management strategies. His recent experience includes assisting local governments with creative solutions to address unique traffic safety issues, as well as advising on regional transit systems, pedestrian connectivity, and shared parking.

EXPERIENCE
• County of San Luis Obispo, Transportation Planning and Traffic Engineering On-Call
• City of Hermosa Beach, Transportation Planning and Traffic Engineering On-Call
• City of Rancho Palos Verdes, Transportation and Traffic Engineering OnCall • California State University Dominguez Hills, Transportation Planning and Engineering Support Services
• Southern California Association of Governments, Park-and-ride Joint Development Project
• City of Glendora Local Roadway Safety Plan (LRSP), Glendora, CA • City of Hawthorne, Transportation Planning and Traffic Engineering On-Call • City of Alhambra, Community Center Traffic Impact Study • City of Barstow, Charter School Traffic Impact Study
• City of Irwindale, Safe Streets for All Comprehensive Safety Action Plan • City of Rancho Palos Verdes, Near-miss Analysis and Gap Analysis • City of Menifee, Residential Development Traffic Impact Study • Sunset4All, Los Angeles, site analysis and roadway cross-sections • City of Long Beach, School Traffic Impact and Circulation Studies • City of Yorba Linda, Richard Nixon Library Parking Study • City of Torrance Downtown Revitalization Plan, Pedestrian Connectivity Ariel Godwin AICP

SENIOR PLANNER

EDUCATION
• Master of City and
Regional Planning, Ohio
State University
• BA, Grinnell College

CERTIFICATIONS
• AICP (American Institute
of Certified Planners)

AREAS OF EXPERTISE
• Traffic Safety Analysis
• Pedestrian & Bicycle
Planning & Design
• Complete Streets Policies
• GIS & Mapping
AWARDS
• NADO Impact Award – City
of Douglas Sidewalk Master
Plan, 2020.
• NADO Impact Award – City
of Nicholls Zoning Code,
2019.
• NADO Innovation Award –
Tifton Downtown Pedestrian
Connectivity Plan, 2018.
• NARC Major Metro
Achievement Award –Florida
Broadband Planning Project,
2015.
• NADO Innovation Award –
Florida Broadband Planning
Project, 2014.

Page 138 of 378 ends

17.F

Page 1556 of 2581 ends

12 12

PROFILE
Sabrina is a highly accomplished transportation engineer with a background in project management and traffic engineering design. Her management responsibilities include overseeing cost estimates, grant assistance, and CAD management, while ensuring quality control for models, plans, and sketches. She has successfully guided conceptual designs and demonstrated forward- thinking in addressing future design needs. Sabrina’s diverse experience spans corridor analysis, adaptive signal plans, pedestrian facilities, and roadway design. Additionally, Sabrina’s commitment to the profession extends beyond technical skills; she actively engages in leadership roles within professional organizations, contributing to mentorship programs and community initiatives.

EXPERIENCE
• Oceanside Boulevard Signals for Private Development, Oceanside, CA - Adjusted signal traffic designs to meet clients’ needs to two signals on Sports Park Way/W. Bobier Drive and Melrose Drive/Oceanside Boulevard.
• Oceanside On-Call, Oceanside, CA - The on-call supported several traffic engineering tasks for Oceanside, CA, such as parking, signage, sight distance and traffic calming measures.
• Poway On-Call, Poway, CA - The on-call supported Poway on several traffic engineering tasks for Poway, CA. This on-call supported as a traffic division for Poway and would support the city on traffic calming, speed review, parking, signal design and timing adjustments, leading pedestrian initiative, land development traffic review, and meeting material preparation for traffic safety committee.
• Warminster Township Signals, Warminster, PA - As-built plans, specialized sign
design, ITERIS coordination, cabinet signal timings review, client meetings, track hours, and conduct field inspections.
• Freemansburg Streetscape, Freemansburg, PA - Cost estimate and accompanying visual report, grant assistance, OpenRoads CAD Management, QA/QC on all models, plans and sketches and management of staff hours, OpenRoads Team Lead and conceptual design, lighting, signage, parking evaluation, and pedestrian study.
• Boot Road Corridor, West Goshen, PA - Developed Synchro corridor, client
communication, assisted with minor PM tasks for preliminary design, performed analternative analysis, pavement markings plans, SignCAD specialized signs, roadway QA/QC, and erosion and sediment control. • Bus Rapid Transit, Pittsburgh, PA - Mast arm design, pedestrian facilities, signal
design, signage design, span wire calculations, and bike lane design. • PA 309 Connector, Kulpsville, PA - Permit and construction signal plans from design to fullbuild. This entailed signal calculations, adaptive signal plans, pedestrian facilities, and sign design.

SABRINA MAMO

SENIOR TRANSPORTATION ENGINEER

EDUCATION
• BS Civil Engineering,
University of South Florida

AREAS OF EXPERTISE
• Traffic Signals
• Traffic Control/MPT
• Roadway
• Specialized Signage
Conceptual Design
• Alternative Analysis
• Intelligent Transportation
Systems Project
Management
• Data Collection
• Report Writing
• Traffic Analysis
• Team Management

MEMBERSHIPS
• ASCE YMF Board Member
(2021-2023)
• ASCE, MOASIC
Corresponding Member
(2022-2023)
• WTS Member (2018-2023)
• MASITE Member
(2021-2023)

Page 139 of 378 ends

17.F

Page 1557 of 2581 ends

13 PROFILE
Cassandra provides traffic engineering and design services ranging from signal designs to signing and striping, traffic control plans, and street lighting.

Her recent experience includes the collection of data and creation of design plans for resurfacing projects, bike path projects, and traffic signal upgrade projects. Cassandra strives to improve communities through implementation of safe and effective methods of transportation.

EXPERIENCE
• San Bernardino Traffic Signal Hardware Upgrade, San Bernardino, CA - Created plans for the relocation, replacement and/or upgrade of traffic signal equipment including vehicle heads, pedestrian heads, and pedestrian push buttons for multiple intersections in the San Bernardino region.
• Colton Speed Study, Colton, CA - Assisted in the collection of data and
preparation of documents for a speed study within city of Colton. • WEHO Melrose, West Hollywood, CA - Performed field visit and created base plans for multiple signalized intersections within the city of West Hollywood.
• Burbank Road Resurfacing Project (Phase I & II), Burbank, CA - Worked on creating signing and striping plans as well as loop replacement plans for multiple corridors pending resurfacing within the city of Burbank. • RPV On-Call, Rancho Palos Verdes, CA - Worked on multiple signing and striping improvement plans, collision diagrams, and traffic signal plans for four Rectangular Rapid Flashing Beacon (RRFB) crossing locations. • Glendora LRSP, Glendora, CA - Set up a site for the collection of stakeholder comments and analyzed collision data to form a report and develop a list of viable countermeasures to be used in a HSIP application. • Carson Signal Design, Carson, CA - Performed a field visit and prepared plans for the installation of poles, curbs, video detection cameras and other traffic signal equipment at an intersection within the city of Carson. • Carson On-Call, Carson, CA - Performed a field visit along multiple corridors for the purpose of implementing bike routes and bike lanes to join disconnected portions of the Dominguez Channel Bike Path. Created signing and striping plans for all connecting sections along the channel and paved street roads.
• LHH Signal Design, La Habra Heights, CA - Created signing and striping plans
for all Hacienda Road within La Habra Heights city limits and assisted with traffic signal design plans.
• CSULB SS, Long Beach, CA - Created signing and striping for stopcontrolled intersection within California State University, Long Beach. • Norwalk TCP, Norwalk, CA - Developed traffic control plans within Caltrans right-of-way for the purpose of utility installation.
• LHH Matrix Oil TCP, La Habra Heights, CA - Developed temporary traffic control plans for the safe maneuver of oversized trucks through curvy narrow road.

CASSANDRA GARCIA EIT

DESIGN ENGINEER

EDUCATION
• Bachelor of Civil
Engineering, California
State Polytechnic
University, Pomona

CERTIFICATIONS
• EIT (Engineer-In-Training)

AREAS OF EXPERTISE
• Computer-Aided Design

Page 140 of 378 ends

17.F

Page 1558 of 2581 ends

Consulting Traffic Engineers to Government Agencies
July 17, 2024
Ms. Candace Sunds,
Procurement Administrator
City of Hemet
445 E. Florida Avenue
Hemet, CA 92543
SUBJECT: PROPOSAL FOR PROFESSIONAL SERVICES FOR:

ON-CALL TRAFFIC ENGINEERING SERVICES

Dear Ms. Sunds:

Hartzog & Crabill, Inc. (HCI) is pleased to submit this proposal for providing On-Call Traffic Engineering Services to the City of Hemet. HCI understands that it is the City’s intent for this process to result with entering into nonexclusive, multi-year professional services agreements with multiple qualified firms on an on-call, as-needed basis. Once a firm is approved, the City may authorize a firm to complete specific engineering services to assist City staff on a Task Order basis as deemed necessary to fulfill the City’s needs. HCI proposes to provide our professional traffic engineering services to the City addressing all tasks identified in the City’s Request for Proposal (RFP), dated June 19, 2024.

HCI has thoroughly examined and become familiar with the work required under this RFP, and is capable of performing quality traffic engineering work to achieve the City’s objectives under a new multi-year contract. HCI acknowledges receipt of Addendums No. 1 – 4 (regarding Q&A), which have also been acknowledged in PlanetBids. The City’s RFP, and Addendums, are incorporated in their entirety as part of our proposal.

In the course of our (30+) years in business, HCI staff have successfully provided these same types of professional on-call traffic engineering consulting services to numerous Southern California city agencies, where we have continued to build on their foundation for a viable, responsive traffic engineering function. Our service to our client agencies over these past years also affords us knowledge of client expectations and work products required.

We look forward to sharing our experience and expertise, moving toward a goal of ever-improving traffic safety and efficiency in the City of Hemet, by augmenting the City’s professional engineering capabilities and providing high-quality, very timely expertise, when needed.

I, Gerald J. Stock, PE, TE, am Executive Vice President and owner of HCI, a California corporation, and am legally authorized to commit to contractual terms and conditions resulting from this submittal.

Gerald J. Stock, PE, TE,
Executive Vice President
17821 E. 17th Street
Suite 245
Tustin, CA 92780
Phone: (714) 731-9455
FAX: (714) 731-9498
www.hartzog-crabill.com

Page 141 of 378 ends

17.F

Page 1559 of 2581 ends

Ms. Candace Sunds
July 17, 2024

Page 2 of 2 ends

Our general company information, including legal name, address, telephone number, and title information of our company principal/owner is provided below:

Hartzog & Crabill, Inc.
17821 E. 17th Street, Suite 245
Tustin, CA 92780
Phone (714) 731-9455
Attn: Mr. Gerald J. Stock, PE, TE, Vice President
Email: [email protected]
If selected, I will remain as the firm principal from HCI to execute a new agreement with the City of Hemet. Our Senior Engineer, Mr. Scott Ma, PE, TE, will be assigned as the responsible engineer to complete the on-call traffic engineering services requested by the City. In addition, our Associate Engineer, Mr. Michael Vallado and our Traffic Signal Systems Supervisor, Mr.

Greg Cabey, will remain available to assist with any requested day-to-day, on-call traffic engineering services.

HCI respectfully requests the City’s review/approval for certain revisions/exceptions on one page of the proposed sample Professional Services Agreement (red-lined exceptions are attached in the Appendix to this proposal). Upon execution of the agreement, HCI confirms that our insurance shall meet or exceed the City’s RFP requirements. HCI is proposing this project as a sole prime consultant, and does not intend on using sub-consultants, with exception to requested/Cityapproved traffic count data collection, as well as possible design potholing to confirm clearance in the larger signal foundations. The attached proposal will remain valid for a period of (180) days from the date of this submittal letter.

We encourage City staff to contact our references listed in our proposal, and solicit additional information regarding our firm’s personnel and qualifications. By signing this cover letter of transmittal below, I attest that all information submitted in the attached proposal is true and correct. On behalf of our entire HCI staff, we sincerely appreciate the opportunity to submit this proposal and being considered to serve your community.

Very truly yours,
HARTZOG & CRABILL, INC.

Gerald J. Stock, PE, TE
Executive Vice President
City & Traffic Engineering Services
Attach: Proposal

Page 142 of 378 ends

17.F

Page 1560 of 2581 ends

PROPOSAL FOR PROFESSIONAL

ON-CALL TRAFFIC ENGINEERING SERVICES
Prepared for:

City of Hemet
445 E. Florida Avenue
Hemet, CA 92543
Attention:

Ms. Candace Sunds,
Procurement Administrator
Presented by:

Hartzog & Crabill, Inc.

Traffic Engineers
17821 E. 17th Street, Suite 245
Tustin, CA 92780
(714) 731-9455
July 17, 2024

Page 143 of 378 ends

17.F

Page 1561 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA Table of Contents
Section Description Page No.(s)
Cover Letter initial pages
I EXPERIENCE 1 – 15
II PERSONNEL 16 – 20
III FEE SCHEDULE (separate file) 20
AGREEMENT/INSURANCE/BUSINESS LICENSE 20

Appendix:
 Resumes
 Exceptions to Agreement

Page 144 of 378 ends

17.F

Page 1562 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 1 ends

Below and on the following pages, Hartzog & Crabill, Inc. (HCI) has provided our responses to the City’s requirements set forth in Section 5.5 PROPOSAL FORMAT and Section 5.6 PROPOSAL CONTENT of the City of Hemet’s RFP (Page 7). We have incorporated the exact order of the bulleted format below and on the following pages to facilitate the City’s review.

COVER LETTER:

Please see our cover letter of transmittal in the initial pages of this proposal package.

SECTION I - EXPERIENCE:

Hartzog & Crabill, Inc. (HCI) is a California corporation operating as a private traffic engineering consulting firm, which has been in business since 1993 offering the same types of traffic engineering services under the same name (over 31 years of related experience). The firm’s sole office location is headquartered in Tustin, CA, which provides quick, easy access to the majority of our client cities. Our general firm information, including legal name, address, telephone numbers, and title information of our company owner/principal are provided below:

Hartzog & Crabill, Inc.
17821 E. 17th Street, Suite 245
Tustin, CA 92780
Phone (714) 731-9455
Fax (714) 731-9498
Attn: Mr. Gerald J. Stock, Executive Vice President
Email: [email protected]
Gerald J. Stock, PE, TE, is Executive Vice President and owner of HCI, and is authorized to commit to contractual terms and conditions resulting from this submittal. If selected, Mr. Jerry Stock will be the firm’s primary point of contact in regards to executing a new agreement with the City of Hemet. HCI has had no failures or refusals in completing a contract, and has no financial interests or conflicts in other lines of business.

LOCATION
The firm’s Tustin office location, located in Orange County near the Santa Ana (I-5) and Costa Mesa (SR-55) Freeway interchange, provides quick, easy access to the majority of our client cities.

The office employees total (12) individuals who comprise a complete staff of professional engineers and support technicians where all design work products are prepared using state-of-theart AutoCAD software and personal office computers from this office location.

Page 145 of 378 ends

17.F

Page 1563 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 2 ends

SECTION I - EXPERIENCE (continued)

DESCRIPTION OF FIRM
HCI is a consulting engineering firm specializing in serving local government agencies with a full array of engineering services, including serving several of our client cities as contract City Traffic Engineer, contract City Engineer, and “on-call” City Traffic Engineer. Specific to traffic engineering, traffic signals operations, and transportation planning, HCI performs various traffic services including, but not limited to, the following:

Design of traffic signal and striping plans, specifications, and estimates (PS&E); traffic control plans; review of traffic impact analyses; preparation of warrant analyses for traffic control devices (traffic signals, Stop signs, crosswalks, flashing beacons, RRFBs, etc.); and engineering and traffic surveys for establishing speed limits; on-going remote and local (off-site/on-site) management of local agency traffic signal systems; development and design of traffic signal coordination systems; assist cities with coordination of services completed by their traffic signal maintenance contractor.

HCI also provides construction observation services on behalf of our client Cities relative to the installation of new or upgraded traffic signals, lighting, and copper/fiber optic interconnect communications in order to verify compliance with approved PS&E.

Since its inception in 1993, HCI has proven itself as a leader in client satisfaction through successful project completion. This is evident in the continued and long-standing relationships we have maintained with our numerous client cities. The successes are attributed to the "hands on" approach that was demonstrated by our founding firm principals, Mr. Trammell Hartzog and Mr.

Jerry Crabill (retired). It is important to note, Mr. Gerald J. Stock (‘Jerry’) is the current owner of HCI. Mr. Stock is a registered Civil and Traffic Engineer whose experience covers over (30+) years. Mr. Stock has been serving the City of Bellflower as both contract City Engineer and City Traffic Engineer for over (24) years.

In addition to our technical expertise, a cornerstone of HCI’s success is our work ethic, loyalty to our client cities, completion of assigned tasks on schedule, and ability to effectively communicate with the public, City staff, and elected officials.

TYPICAL SERVICES
Working with numerous Southern California cities, HCI has been responsible for directing the activities of Traffic Divisions, providing expertise to City Engineering and Planning staffs, and responding to requests, inquiries and concerns of citizens and City Council members; typical of certain needs identified by the City of Hemet’s RFP for overall engineering services.

Page 146 of 378 ends

17.F

Page 1564 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 3 ends

SECTION I - EXPERIENCE (continued)
TYPICAL SERVICES (cont’d)
If desired, our overall services available to the City of Hemet include the following:
 Traffic signal design
 Signing & striping design
 Warrant analyses for traffic control devices, such as traffic signals, Stop signs, crosswalks  Traffic signal LOS operational analyses
 Develop and implement traffic signal timing plans
 Develop, design and implement traffic signal coordination systems  Remote and local (off-site/on-site) management of traffic signals  Traffic management plans (traffic control plans)
 Review of traffic impact analyses
 Provide construction observation/management services on behalf of the City on all proposed traffic improvements, development, site and traffic management plans to ensure conformance with applicable standards (City, AASHTO, Cal. MUTCD, etc.)  Coordination of activities of our client cities’ traffic maintenance contractor  Engineering and Traffic Surveys for establishing speed limits  Other traffic-related impact reports, surveys, and analyses From our office location, HCI also continuously operates twelve (12) agencies’ citywide traffic signal systems. The local agencies where HCI operates and maintains the coordination timing for traffic signals are the following cities:
1) Aliso Viejo 5) La Palma 9) San Juan Capistrano
2) Cerritos 6) Laguna Hills 10) Stanton
3) Cypress 7) Moorpark 11) Tustin
4) Indian Wells 8) Rancho Santa Margarita 12) Yorba Linda

Page 147 of 378 ends

17.F

Page 1565 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 4 ends

SECTION I - EXPERIENCE (continued)

PERSONNEL
All of our personnel are available and headquartered at our Tustin office. In regards to Cityrequested On-call Traffic Engineering Services, as mentioned these engineering services will be managed by our Senior Engineer, Mr. Scott Ma, PE, TE, who is available and works closely with our company firm principal, Mr. Jerry Stock, PE, TE, as well as our Associate Engineer, our Senior Designers, and our Traffic Signal Systems Supervisor and Specialist.

Scott is currently performing similar on-call Traffic Engineer, and design/plan-checking services for the Cities of Lake Forest and Hermosa Beach; however, his availability to serve the City of Hemet is still at 40%. Our other key staff is available to serve the City at minimum 20% and up to 50%.

Further details of our personnel staff are provided in the following Section II (starting on Page 16).

It is important to note, our proposed staff is distinctly ready to serve the City of Hemet Public Works Department, and is immediately available to perform any of the requested on-call traffic engineering services with minimal supervision (including any backload of City work).

DISCLOSURES
HCI does not have any “Conflict-of-Interest” in working with the City of Hemet. HCI has no potential conflicts to disclose, and is not working on any projects (for another company or agency) that the City of Hemet needs to review on behalf of the City. Lastly, HCI also does not have any disciplinary actions against our firm to disclose.

Page 148 of 378 ends

17.F

Page 1566 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 5 ends

SECTION I - EXPERIENCE (continued)
Below we are providing a listing of nine (9) relevant City references, where HCI continues our oncall traffic engineering and signal design services, for the City of Hemet’s review & verification of our experience. All services are considered on-call/on-going traffic engineering services with assigned projects completed as requested and on schedule.

1. City of Bellflower - City Engineer & City Traffic Engineer Contract Services, (since 2000) Mr. Len Gorecki, Assist. City Manager/Public Works Director, [email protected] (562) 804-1424; Project Manager and Principal in Charge of Services – Mr. Gerald J. Stock, PE, TE

2. City of Cypress - City Traffic Engineering & Signal Operations Services, (since 1994) Mr. Nick Mangkalakiri, P.E., City Engineer, [email protected], (714) 229-6750; Principal in Charge of Traffic Signals – Mr. Greg Cabey

3. City of Hermosa Beach - On-Call City Traffic Engineer Contract Services, (since 2006) Mr. Lucho Rodriguez, Acting Director of Public Works, [email protected], (310) 318-0210; Contract City Traffic Engineer – Mr. Scott Ma, PE, TE

4. City of Indian Wells – On-Call City Traffic Engineering & Signal Operations Services, (since 2015) Mr. Ken Seumalo, P.E., Public Works Director, [email protected]; (760) 776-0237; Project Manager and Principal in Charge of Signals – Mr. Greg Cabey

5. City of Laguna Hills - City Traffic Engineering & Signal Operations Services (since 2000) Mr. Joe Ames, PE, TE, Public Works Director/City Engineer, [email protected]; (949) 707-2655; On-Call Traffic Engineering Services
Project Manager and Principal in Charge of TE Services – Mr. Gerald J. Stock, PE, TE On-Call Traffic Signal Operations Support Services
Principal in Charge of Signals – Mr. Greg Cabey

6. City of Lake Forest – City Traffic Engineer Services, (since 2014) Mr. Thomas E. Wheeler, P.E., Director of Public Works, [email protected]; (949) 461-3480; On-call Professional Engineering Services
Project Manager in Charge of Traffic Engineering Services – Mr. Scott Ma, PE, TE

7. City of San Juan Capistrano - On-Call Traffic Signal Operations Services, (since 1995) Mr. George Alvarez, Project Manager, [email protected], (949) 443-6351; Principal in Charge of Traffic Signals – Mr. Greg Cabey

8. City of Tustin - City Traffic Engineering & Signal Operations Services, (since 1993) Mr. Ken Nishikawa, Deputy Director of Public Works, [email protected]; (714) 573-3263; On-call Professional Engineering Services
Project Manager in Charge of Traffic Engineering Services – Mr. Doug Anderson Traffic Signal Operations Support Services / Signal Monitoring Project Manager and Principal in Charge of Traffic Signals – Mr. Greg Cabey On-Call Traffic Signal, Signing & Striping, & Traffic Control Plan-Checking Services Project Manager in Charge of Plan-Checking Services – Mr. Scott Ma, PE, TE

9. City of Yorba Linda - On-Call City Traffic Engineering Services, (since 1994) Mr. Tony Wang, Traffic Engineering Manager, [email protected]; (714) 961-7170; Project Manager and Principal in Charge of Traffic Signals – Mr. Greg Cabey

Page 149 of 378 ends

17.F

Page 1567 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 6 ends

SECTION I - EXPERIENCE (continued)
HCI has extensive experience in the development of traffic engineering plans, such as traffic signal design/modification, signal interconnect design, and signing & striping, as these are among our firm's primary service products. In the past recent years, our HCI project team successfully completed the following design plans:
• San Juan Capistrano – HCI recently completed a traffic signal modification design for Adams Streeter for the intersection of Camino Capistrano and Old Mission Road in 2024, which included signing/striping design, as part of the Arguello Way Beautification project. Construction is expected in 2024.
• City of Yucaipa – HCI recently completed a traffic signal installation design for the intersection of Oak Glen Road and Colorado Street in 2023. Construction is expected in 2024. • City of San Juan Capistrano – HCI recently completed a traffic signal installation design for the intersection of La Novia Avenue and Calle Arroyo in 2023. Construction is expected in 2024. • City of Bellflower – HCI recently completed two traffic signal designs in 2023: 1) intersection of Bellflower Blvd at Park St; and 2) intersection of Bellflower Blvd at Cedar St. Construction is expected in 2024. HCI also completed 4 other traffic signal designs along Lakewood Blvd in 2022. • City of Yucaipa – HCI completed a traffic signal installation design for the intersection of Live Oak Canyon Road and Outer Highway 10 South during the past year in 2022. HCI also completed 2 other traffic signal designs for the City: 1) Oak Glen Road at Sunnyside Drive Signal Modification in 2021; and 2) Oak Glen Road at 2nd Street Signal Installation in 2020. • Town of Apple Valley – HCI completed a traffic signal modification design for the intersection of Navajo Road and Powhatan Road in 2022 for adding protected left-turn phasing to the SB movement, and included a left-turn phasing warrant and LOS analysis. HCI also completed a similar traffic signal modification design for the intersection of Bear Valley Road and Deep Creek Road in 2021.
• County of Riverside/Caltrans – HCI completed a traffic signal modification design for the County/Caltrans shared intersection of Winchester Road and Thompson Road in 2021, which included signing/striping design, as part of an adjacent development project. • City of Bellflower – HCI completed 3 new traffic signal designs in 2020: 1) Bellflower Blvd at Harvard St.; 2) Bellflower Blvd at Mayne St.; and 3) Woodruff Ave at Lindale St. The designs included signing/striping and minor civil engineering work. Both Bellflower Blvd signals included decorative traffic signal equipment.
• City of Whittier – HCI completed a new/modified traffic signal design for the off-set Tintersection of Greenleaf Avenue and Putnam Street in 2019. The design included updating the existing signal, and including the adjacent offset T-intersection into one signalized intersection with special off-set overlap phasing. The design also included new video detection, EVP, signing & striping design, and minor civil engineering work.

Page 150 of 378 ends

17.F

Page 1568 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 7 ends

SECTION I - EXPERIENCE (continued)
HCI also has extensive experience in the preparation of traffic-related studies, such as traffic signal warrant studies, left-turn phasing warrant studies, Stop sign warrant studies, LOS operational/queuing analyses, Engineering and Traffic (E&T) speed limit surveys, as well as traffic signal timing, plan-checking services, and review of traffic impact analyses for our client cities. In the past recent years, our HCI project team completed the following:
• Cerritos – Multi-Way Stop Sign warrant analyses for 1 intersection in 2024. • Stanton – E&T Survey for Speed Limits. Completed in 2024. • Laguna Hills – Sight Distance Evaluation at 2 locations. Completed in 2024 & 2023. • Laguna Hills – Multi-Way Stop Sign warrant analyses for 2 intersection, as well as a separate roadway speed evaluation and marked crosswalk analysis, in 2023. • Laguna Hills – Prepared Traffic Signal Master Plan for 18 Intersections in 2023. • Coto de Caza – Sight Distance Evaluation. Completed in 2023. • Town of Apple Valley – Left-turn Phasing Warrant Analysis at Navajo/Powhatan in 2022. • Indian Wells – E&T Survey for Speed Limits. Completed in 2022. • Coto de Caza – Signing & Striping Roadway Evaluation. Completed in 2022. • City of Bellflower – 3 Left-turn Phasing Warrant Analyses on Foster Road in 2022. • City of Yucaipa – Multi-Way Stop Sign warrant analyses for 4 intersections in 2022. • City of Indian Wells – Multi-Way Stop warrant analyses for 2 intersections in 2022. • City of Stanton – Crossing Guard warrant analyses for 3 intersections in 2022. • City of Bellflower – Traffic Signal Warrant Analysis for Bellflower/Cedar in 2022. • City of Lake Forest – Marked Crosswalk Analysis for Catalina at Mariposa in 2021. • City of Bellflower – Left-turn Phasing Warrant Analysis for Bellflower/Park in 2021.

Page 151 of 378 ends

17.F

Page 1569 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 8 ends

SECTION I - EXPERIENCE (continued)
OVERVIEW AND APPROACH TO CITY REQUESTED SERVICES:

In general, HCI understands that the City’s on-call traffic engineering services may require development of construction documents for necessary roadway engineering plans, including traffic signal plans, signing and striping plans, and also may include related plan-check and traffic studies.

More specifically, we understand that the City is interested in selecting consultants who have the civil & traffic engineering experience and expertise to provide as-needed engineering services, including traffic signal design, signing & striping design, and related plan-check services, and review of traffic analyses.

We also understand the purpose of developing a qualified list of consultants capable of performing this work is to have a ready contract and required insurance in place to streamline the process of contracting for engineering and design work on various projects. These services are intended to be an on-call/as-needed basis to supplement staff’s efforts where specific expertise is required or time constraints necessitate consultant assistance.

HCI provides these and other types of traffic engineering services, including traffic design, traffic signal timing, warrant analyses, construction observation services, and other traffic-related duties in a comprehensive and timely manner.

HCI does possess the expertise, experience, and familiarity in successfully providing the requested traffic engineering design services, including working with various regional agencies such as Riverside County and Caltrans District 8. On the following pages, we have provided responses on our typical on-call engineering experience and capabilities below each type of possibly requested engineering consultant service that may be assigned by the City.

If selected, our Senior Engineer, Mr. Scott Ma, PE, TE, and our Associate Engineer, Mr. Michael Vallado, will serve the City of Hemet in providing design and/or recommendations and requested services to the City’s principal contact on an on-call basis. This team will ensure that consistent communication between the City of Hemet and HCI occurs regularly.

On-call Traffic Engineering Services
Our assigned staff that will serve the City of Hemet have a thorough knowledge and proficiency in local agency municipal codes, current State (Caltrans) standard plans and specifications, Highway Design Manual, Highway Capacity Manual, California Manual on Uniform Traffic Control Devices (CA MUTCD), policies and procedures for ADA regulations, traffic signal timing, traffic engineering modeling and methodologies, County/City traffic standards and methodologies, and the State of California Vehicle Code. Our team will provide the City with the materials and labor to perform the requested traffic engineering services and conform to these standards.

Page 152 of 378 ends

17.F

Page 1570 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 9 ends

SECTION I - EXPERIENCE (continued)
Under the direction of the City’s principal contact, or other approved staff member, HCI will be ready to provide on-call traffic engineering consulting services and address the following areas within the City of Hemet Public Works Department:

1. Provide traffic engineering design.

HCI has extensive experience in the development of traffic engineering plans, such as new traffic signal, traffic signal modification, signal interconnect, signing and striping, and traffic control plans, as these are our firm’s primary service products. For each of these types of plans, HCI includes technical provisions and engineer’s estimates that complement each plan set providing complete PS&E that is ready for construction bidding on time and within the approved schedule. Examples of our different types of designs can be submitted for the City’s review upon request.

2. Review, plan-check, and make recommendations on traffic plans and reports, and provide input relating to traffic issues on planning and development applications.

Our staff also has extensive experience in reviewing and analyzing several types of City and developer-related plans, as well as assimilating the findings and recommendations into easily understood summations. Our experience and expertise also allows quick and complete site plan review for traffic engineering applications to determine conformance to traffic, parking, access, street and pavement, subdivision requirements, meetings with developers or contractors to resolve traffic issues.

It is noted that many development-related services such as the review of street improvement or traffic signal plans are project specific and are treated as recoverable project costs.

Upon request, HCI staff will render and remit a typed plan-check correction/clarification list (2 copies) to the Public Works Department within (10) working days from notification by the City for a typical development project.

3. When requested, prepare written engineering reports related to pedestrian traffic patterns, traffic installations, and traffic control devices such as STOP signs, traffic signals, crosswalks, speed zones, traffic control, and similar matters.

Our staff prepares numerous amounts of warrant analysis and traffic operations reports every year for various city agencies, such as, traffic signal warrants, left-turn phasing warrants, multiway stop warrants, operational level-of-service (LOS), queuing analyses, crosswalk warrants, traffic calming studies, Engineering and Traffic (E&T) surveys for speed limits, etc. HCI staff has obtained and analyzed data, prepared exhibits, and developed reports for literally hundreds of traffic studies. Sample reports can be forwarded to the City upon request.

Page 153 of 378 ends

17.F

Page 1571 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 10 ends

SECTION I - EXPERIENCE (continued)
Again, HCI staff has extensive experience in reviewing and analyzing all types of City and developer-related traffic studies and reports, as well as assimilating the findings and recommendations into easily understood summations.

4. Provide technical advice on traffic signal facilities, accident rates, new developments, and maintenance of traffic facilities.

HCI has the capability and range of expertise to provide technical advice to the City of Hemet on many traffic or transportation-related issues or facilities. HCI staff will complete the requested services in a thorough and efficient manner, on time and within the approved fee schedule.

5. Review proposed improvements for conformance to the City’s Traffic Standards.

As previously noted, HCI has the expertise to review proposed improvements, development, site, and traffic management plans (i.e., traffic control plans) for conformance to the City’s standards, from both a traffic engineering and civil engineering perspective.

6. Work closely with City staff, Caltrans, Riverside County, and local law enforcement agencies in analyzing traffic-related issues and mitigation.

A tenet of HCI is our belief that we serve as an extension of City staff and consider ourselves as associates in the well-being of the City. Through our successful work in other communities, HCI already has these relationships firmly established. One notable and particularly important relationship is working with Caltrans. HCI staff has been able to quickly contact the correct person for project development, along with other similar individuals at Caltrans District 7 as well as Riverside County, in order to resolve trafficrelated matters that affect our client cities.

7. Work with City staff and other consultants in developing, monitoring and providing input into traffic services.

Since our client base are primarily municipalities, we have extensive experience working with both City staffs and other city consultants in providing the support necessary to ensure that traffic services and transportation planning required by the City are met.

These associations also afford HCI the opportunity to learn and share new technologies, products and procedures with our client cities.

Page 154 of 378 ends

17.F

Page 1572 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 11 ends

SECTION I - EXPERIENCE (continued)

8. When requested, advise the City regarding traffic-related matters.

HCI’s collective experience and expertise in most aspects of traffic and transportation engineering allows our staff to provide advice and recommendations to our client cities on numerous traffic issues. If a new or unique situation arises, HCI staff does not hesitate in performing the research necessary to determine an appropriate action or recommendation.

9. Develop a prioritized list of traffic improvement projects for inclusion into the City’s Capital Improvement Program (CIP) and incorporate into existing project lists.

HCI has also worked with many of our client cities in identifying and developing long and short-range CIP projects consistent with the economic capabilities of the City. A fundamental goal of HCI in developing CIP projects is to provide City staff with that data necessary to make meaningful decisions at critical stages of the project’s development, in order to provide viable, achievable options. Consistently reaching this goal assists with resolving issues and problems associated with each project.

Possible traffic engineering candidate projects the City of Hemet may desire to consider or expand on include the following:
a.) Video surveillance of other major intersections or street segments. b.) Identification and analysis of potential critical intersections, improvement alternatives, and funding opportunities.
c.) An updated Signal Construction or Modification Priority List, including long-term maintenance and equipment needs.
d.) Implementation of citywide emergency vehicle preemption (EVP) systems. e.) Countdown pedestrian signal indications.
f.) APS pedestrian push-buttons.
g.) Changeable message signs.

10. Other duties, as assigned by City Engineer or Director of Public Works.

As previously noted, HCI’s collective experience and expertise in most aspects of traffic and transportation engineering allows our staff to provide recommendations to our client cities on numerous traffic issues. Consequently, if a unique situation arises or a new duty is assigned by the City’s principal contact, HCI staff will not hesitate in performing the research necessary to determine an appropriate action or recommendation.

If other services are requested on a project-by-project basis, HCI will negotiate with the City and provide a pre-agreed scope of work and hours required to complete the work.

Page 155 of 378 ends

17.F

Page 1573 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 12 ends

SECTION I - EXPERIENCE (continued)
TRAFFIC SIGNAL OPERATIONS SUPPORT SERVICES:

It is noted, we are including an explanation of our traffic signal support services for the City’s review. We understand these particular services may not be needed; however, they are provided as part of our experience information for the City’s consideration.

As mentioned, HCI currently manages the traffic signals and signal systems of (12) cities on a daily basis. Consequently, we have a very good understanding and are infinitely familiar with both the Econolite control equipment as well as the Centracs and Aries Traffic Management System softwares for traffic signal systems management. In regards to coordination timing and separate time-referencing devices, all signal controller time clocks that we manage are constantly updated through our Centracs and Aries Traffic Management softwares, which are always connected to the GPS time via internet.

HCI’s project-specific experience includes extensive knowledge on the local agency’s signal controllers. HCI staff continuously (daily) interfaces with the signal controllers in our client cities which currently use the Econolite ASC/2S, ASC/3, and the latest Cobalt system controllers, the ASC/2M master controllers, and managed by the Centracs and Aries Traffic Signal Management systems.

HCI staff’s “hands-on” traffic signal timing experience comprises all levels of timing applications, including timing input into signal system controllers manually and from our traffic signal management center through our licensed system software, designing and installing special “custom” traffic signal operational circuitry, and maintaining signal interconnect operations.

Our same team members have been working with several City staffs during the past several years in monitoring their City’s systems.

Lastly, throughout the past years, HCI has maintained a good working relationship with Caltrans, as several projects have been implemented that successfully interfaced with freeway interchange traffic signal systems.

In conjunction, HCI staff continues our on-going excellent relationships with most traffic signal, lighting, and signal maintenance contractors (and their technicians) including Econolite Group (Aegis), Siemens ITS, Computer Services Company (CSC), Bear Electric, St. Francis, as well as with Caltrans and the County of Riverside for any shared City/State or City/County intersections.

Page 156 of 378 ends

17.F

Page 1574 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 13 ends

SECTION I - EXPERIENCE (continued)
Approach
The specific approach to our traffic signal operations and management services that HCI provides to our client agencies includes the following:

HCI typically provides a Traffic Signal Systems Specialist for the monitoring support on all the City’s traffic signals. The Specialist sets up the Scheduled Operations on the Centracs or Aries Traffic Management systems specifically for our client City’s systems in order to automatically perform a variety of tasks. Specifically, the Centracs/Aries functions and Specialist’s time spent on these services include performing the following daily sub-tasks:

1. The Scheduled Operations automatically gather and store historical data and real-time information on all the City’s traffic signal operations programmed;

2. The data is reviewed daily to verify that all traffic signals are working properly;

3. Any malfunctions logged are immediately reported to the City’s designated traffic signal maintenance contractor, for dispatch;

4. The historical data is also analyzed to identify traffic volumes and patterns in order to assist in determining if adjustments to signal timing is necessary;

5. Verify if all timing is programmed correctly in each master and local controller.

HCI staff typically reports traffic signal problems and malfunctions to the City’s traffic signal maintenance contractor within (24) hours. HCI staff coordinates all work associated with the City’s contractor and also provides verification to the City of their completed work. HCI staff often assists the City in resolving traffic signal control complaints by speaking by phone/email/in person with the resident(s)/City personnel on their specific request/complaint. HCI staff completes the necessary investigation and makes recommendations to the City on identified traffic signal improvements, such as equipment upgrade, more efficient signal phasing, significant timing adjustments, any new coordinated signal control systems, etc.

Upon request, HCI staff may also drive each project arterial during peak-periods in order to verify and fine-tune coordination timing. If necessary and approved by the City, HCI also coordinates/gathers updated traffic counts as part of the investigation.

The above approach has proven to be a valuable service to our client cities, as the on-going scheduled signal management has minimized overall time in troubleshooting, repair, and maintenance company efforts by City staff on their citywide traffic signal system. In turn, this controlled management service actually saves the City on the amount of time and personnel required to monitor and repair signal related issues.

Page 157 of 378 ends

17.F

Page 1575 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 14 ends

SECTION I - EXPERIENCE (continued)
Project Controls
A tenet of HCI is our belief that when acting on behalf of the City of Hemet, we serve as staff associates, or as an extension of City staff, in the well-being of the City. As such, we try our very best to always streamline the required traffic signal management tasks, design and plan review process, and also believe we have a commensurate responsibility to the public for high quality performance of our own services, and quality assurance when reviewing others’ plans.

All of our staff that will serve the City of Hemet have a thorough knowledge and proficiency in local agency municipal codes, current State (Caltrans) Standard Plans and Specifications, Highway Design Manual, Highway Capacity Manual, California Manual on Uniform Traffic Control Devices (CA MUTCD), policies and procedures for ADA regulations, traffic signal timing, traffic engineering modeling and methodologies, County/City traffic standards and methodologies, and the State of California Vehicle Code.

Upon request by the contract officer, our team will provide the City with all materials and labor to perform the requested on-call traffic/transportation engineering and traffic signal operations support services and conform to industry standards. In addition to our technical expertise, our staff possesses the ability to effectively communicate in oral or written form and have no difficulty speaking before groups, if requested by the City.

As part of our on-call traffic engineering and on-going signal management services, HCI staff remains available to provide assistance to the City contract officer and/or contractors during the construction phases, as applicable, either in person, or via email or phone.

As we specialize in traffic design, HCI prides itself on timely design phase submittals, complete internal plan-checks of our own designs or other consultants’ designs, and consistently providing a quick turn-around for addressing comments. We typically provide 60%, 90% and final submittals on our designs within 4 to 8 weeks, and rarely have significant comments on our own design plans.

Upon review and final approval by the City of the preliminary engineering plans submitted, a final set of the plans, specifications, and construction estimate (PS&E) are typically submitted within a week, including a construction item list with quantity extensions and definitions suitable for bidding. Our typical turn-around for plan-check services is within one to two weeks from receipt.

Similarly, HCI can control costs by providing accurate and timely invoices through internal control measures. HCI prides itself on consistently working with the City to quickly address requests and staying in budget. HCI’s ability to take a request from the City for a traffic design all the way through completion of construction, including signal timing and operations tasks, ensures greater accuracy, efficiency, and timely results.

Page 158 of 378 ends

17.F

Page 1576 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 15 ends

SECTION I - EXPERIENCE (continued)
Quality Control/Quality Assurance (QA/QC)
HCI employs the following QA/QC program that outlines the definition of roles, responsibilities, expectations, review requirements, and quality standards of all services, documents, and procedures in order to ensure a high standard of work:
a) Service Request or Plan Review:

Our service tasks and submitted documents go through three levels of review prior to response: Initial Peer Review, Project Manager Review, and QA/QC Review. This three-tiered review allows for error mitigation on three separated levels of detail: ground level (signal design and management check, drafting, calculations, and document formatting), project management level (signal design and management decision, and project intent compliance) and quality assurance level (signal design and management confirmation, completeness of document and ensure “biddable” or “implementable” plans). Our service tasks and plan checks look at the 5C’s: consistent, correct, clear, constructible, and complete.
b) Communication:

HCI will stay in constant communication with the City contract officer to ensure we understand the service request and have all necessary milestones in place and that we meet those milestones. As previous clients can attest to, our team will allocate as many engineering and support staff to the project to ensure the schedule is maintained and that the City is satisfied with the delivery of the project. We make it a point to accommodate our client's needs, and we guarantee satisfaction with our ability to deliver. By making ourselves consistently available to the City, we avoid delays and any defects to the final traffic PS&E or any signal services that could occur as a result of miscommunication or misunderstanding.
c) Scheduling:

For the remote possibility there is a delay, our project manager will develop strategies to bring the project back on track using all necessary means at no additional cost to the City.

Above all else, clear communication will be the critical item in bringing any schedule slippage back on track. Our staff will actively communicate with the contract officer and affected parties to reschedule or reallocate resources in an effort to expedite all necessary items. Tasks can be reorganized to allow for staggering of work items.

Page 159 of 378 ends

17.F

Page 1577 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 16 ends

SECTION 2 - PERSONNEL:

HCI staff is comprised of (12) engineering professionals and technicians who have the proven ability/expertise to meet the ever-changing, challenging needs of the modern city. As shown above, HCI is providing an organizational chart showing the relationship of the City of Hemet and our proposed consultant team. Our proposed personnel are all headquartered in our Tustin office and will remain during the term of the agreement. HCI is proposing as the prime consultant, with two sub-consultants: NDS and possibly C Below or Bess Testlab. National Data & Surveying Services, Inc. (NDS) may be used more frequently for requested traffic count data collection associated with reports, surveys, studies, and investigations. C Below or Bess Testlab will only be used as-needed/City-approved for design potholing of traffic signal pole foundations.

Traffic Signal
Monitoring
Jerry Stock, PE, TE
Scott Ma, PE, TE
Senior Engineer
Greg Cabey, Traffic Signals
Systems Supervisor
Todd Hartzog,   Senior Designer
Michael Powers, Traffic
Signals Systems Specialist
Principal‐In‐Charge of Agreement
Jerry Stock, PE, TE,
Principal Engineer
Project Manager
Scott Ma, PE, TE,
Senior Engineer
Traffic Signal Design &
Plan‐Check, Signal
Operations/Coordination
Traffic &  Transportation
Studies & Warrant
Reports, Exhibits
Jerry Stock, PE, TE
Scott Ma, PE, TE
Michael Vallado,
Associate Engineer

Dave Martorano,   Senior Designer
Sub‐Consultants
NDS, Inc.
(count data)
C Below
(design potholing)
Bess TestLab, Inc.
(design potholing)

Page 160 of 378 ends

17.F

Page 1578 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 17 ends

SECTION 2 - PERSONNEL: (continued)
HCI TEAM ORGANIZATION AVAILABLE TO SERVE THE CITY OF HEMET FOR ONCALL TRAFFIC ENGINEERING SERVICES:

Firm Principal In Charge of Agreement/Contract:

Mr. Jerry Stock, PE, TE, Principal Engineer
Key Staff:

Mr. Scott Ma, PE, TE, Senior Engineer (Project Manager) Mr. Michael Vallado, Associate Engineer
Mr. Greg Cabey, Traffic Signal Systems Supervisor
Mr. Todd Hartzog, Senior Designer
Mr. Dave Martorano, Senior Designer
Mr. Michael Powers, Traffic Signal Systems Specialist
As mentioned, HCI staff is comprised of (12) engineering professionals and technicians who have the proven ability and expertise to meet the ever-changing, challenging needs of the modern city.

As shown above, in regards to City-requested On-Call Traffic Engineering Services that may include design, operations, timing and traffic signal plan-check services, these requested on-call engineering services will be managed by our Senior Engineer, Mr. Scott Ma, PE, TE. Scott works closely with our Associate Engineer and Senior Designers, as well as our Signal Systems Supervisor and Specialist in the majority of our design projects.

All HCI personnel listed are all headquartered at our Tustin office. It should be mentioned, HCI and assigned key professional engineering staff are properly registered/licensed to practice in the State of California and will comply with all federal, state, and local laws and ordinances applicable to the work assigned.

For most requested services, HCI proposes to serve the City of Hemet as a sole prime consultant on specific projects and does not intend on using any sub-contractors, with exception to obtaining City-requested traffic count data and possible design potholing for new, larger traffic signal pole foundations to obtain clearance of underground utilities.

Below are ‘summary’ qualifications of our proposed staffing plan per our textual organization chart above (full resumes attached):

Page 161 of 378 ends

17.F

Page 1579 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 18 ends

SECTION 2 - PERSONNEL: (continued)
Mr. Gerald J. Stock, PE, TE, HCI Executive Vice-President, Principal Engineer Mr. ‘Jerry’ Stock is a registered professional Civil and Traffic Engineer with more than (34) years of municipal engineering experience. If selected, Jerry will serve as the firm Principal-In-Charge of the new agreement with the City of Hemet for the requested on-call engineering consulting services. Jerry presently serves the City of Bellflower as contract City Engineer and City Traffic Engineer since November 2000. Jerry has been responsible for completing the majority of our Engineering and Traffic (E&T) Survey for Speed Limits for numerous local Southern California agencies.

Mr. Scott Ma, PE, TE – Senior Engineer (Project Manager) Mr. Scott Ma is a licensed, professional Civil and Traffic Engineer registered in the State of California and brings over (24) years of engineering experience. Scott is a senior engineer that works in our HCI Tustin office, and is currently providing part-time contract City Traffic Engineer services to Cities of Lake Forest, as well as on-call traffic engineering services to the City of Hermosa Beach.

Scott’s experience includes reviewing and conducting a variety of traffic studies including but not limited to, warrant analyses, preparing and reviewing traffic impact analyses reports and recommendations, responding to community requests such as crosswalks, traffic signals, stop signs, parking matters, and also performing project management that includes the final design preparation and submittal of project plans, specifications, and estimates (PS&E). His experience also includes overseeing numerous aspects of our client cities’ consulting service requirements in regards to review of traffic-related requests, analyses and operational studies, permits, and other daily duties requested.

As mentioned, Scott will be assigned as Project Manager to perform the requested on-call traffic engineering services for the City of Hemet. Scott’s email address contact information is [email protected].

Mr. Michael A. Vallado – Associate Engineer
Mr. ‘Mike’ Vallado provides assistance to Mr. Jerry Stock, and Mr. Scott Ma in the area of preparation of traffic signal and left-turn phasing warrant analysis reports, traffic signal operations (LOS) and queuing analyses, multi-way Stop sign analyses, and related project specifications.

Mike brings over (25) years of experience specifically related to traffic-engineering and signal design. Five of these years were devoted to running the City of Glendora's Traffic Engineering section, while the past (20) years have been with HCI. His primary responsibilities with HCI include preparing signal analysis reports & recommendations, warrant analyses and evaluations, project specifications, and final review & preparation of plans, specifications, and estimates to our client cities.

Page 162 of 378 ends

17.F

Page 1580 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 19 ends

SECTION 2 - PERSONNEL: (continued)
Mr. Greg Cabey - Traffic Signal Systems Supervisor
Mr. Cabey brings over (30+) years of traffic signal experience to the HCI team and will be involved in certain aspects of requested traffic signal timing and operations tasks. Prior to HCI, Greg was a Lead Technician for Peek Traffic for over (12) years, and is certified as an International Municipal Signal Association (IMSA) Level III Traffic Signal Technician. This HCI and Peek Traffic experience has allowed him to continue retaining in-depth knowledge on the types of controllers in the area’s traffic signal system. His extensive field experience and familiarity with signal systems and timing will aid in the complete success of any requested traffic signal design and signal timing related services.

Mr. Todd Hartzog – Senior Designer
Mr. Todd Hartzog provides assistance to our team in the area of signal design. Todd brings over (30) years of experience specifically related to traffic signal and signing/striping design, traffic signal operations/monitoring assistance, and overall traffic engineering services. His responsibilities also include CAD designs on traffic projects, including traffic signal, interconnect, and signing and striping plans.

Mr. David Martorano – Senior Designer
Mr. David ‘Dave’ Martorano provides assistance to our team in the area of traffic engineering design, signing & striping design, and traffic control plan preparation. Dave has been with HCI for (30) years with overall experience in traffic engineering design. His responsibilities with HCI include project research and full AutoCAD design on all traffic-related projects, including traffic signal, interconnect, signing/striping, and traffic control plans.

Mr. Michael Powers - Traffic Signal Systems Specialist
Mr. Michael Powers brings over (30) years of traffic signal experience to the HCI team and will also be involved in requested traffic signal timing and related trouble-shooting & observation tasks. Michael is certified as an International Municipal Signal Association (IMSA) Level III Traffic Signal Technician. Prior to HCI, Michael worked for Siemens (Republic) as a Lead Technician for over (20) years.

Page 163 of 378 ends

17.F

Page 1581 of 2581 ends

Proposal for On-Call Traffic Engineering Services for the City of Hemet, CA

Page 20 ends

SECTION 2 - PERSONNEL: (continued)

SUB-CONSULTANTS
In terms of possible City-requested traffic count data collection, HCI proposes to use National Data & Surveying (NDS) Services, headquartered in Los Angeles, CA to collect any required vehicular traffic and pedestrian data as part of City-requested reports, surveys, studies, and investigations.

Founded in 1989, NDS was established to deliver accurate and professional solutions to their client’s traffic, transit and GIS/GPS data collection needs. NDS has over (35) years of successful operations, and an outstanding team of (100) professional full time employees that have established them as the foremost, full service traffic and transit data collection company on the west coast. NDS is certified as a SBE by the State of California.

HCI has successfully partnered with NDS on numerous data collection projects over the last (26) years, realizing their competitive pricing on their efficient data collection.

Projects that HCI has completed with NDS include data collection for numerous stop sign warrant analyses, traffic signal warrants analyses, left-turn phasing/delay warrant studies, citywide E&T speed limit surveys, citywide ADT flow maps, truck classification counts for TI calculations, traffic signal timing development (counts for free & coordinated timing), SYNCHRO Level-ofService (LOS) operational/queuing analyses, crosswalk analyses, video surveillance and parking studies. Upon request by the City of Hemet, HCI will use NDS to conduct count data collection specific to the requested task(s).

SECTION III – FEE SCHEDULE:

HCI is aware of the City’s fixed rates for plan check services per the RFP. As outlined in Section

5.6 of the City’s RFP, under c), as these are on-call, as-needed traffic engineering services, HCI is providing our Schedule of Hourly Rates (Fee Schedule attached as a separate Cost File) for compensation of City-requested On-Call Traffic Engineering Services. These rates will be valid through a new minimum 3-year contract. HCI understands there is an option to renew for 2 oneyear additional terms. HCI respectfully requests possible adjustment of rates after the initial 3 years, at renewal of the two one-year additional terms.

AGREEMENT/INSURANCE/BUSINESS LICENSE:

HCI agrees to the terms in the RFP, and respectfully requests the City’s review and approval for certain revisions/exceptions on one page of the proposed sample Professional Services Agreement (red-lined exceptions are attached in the Appendix to this proposal). HCI will provide updated insurance and business license requirements at the time of execution of a new agreement for a three-year contract.

Page 164 of 378 ends

17.F

Page 1582 of 2581 ends

Hartzog & Crabill, Inc.

Consulting Traffic Engineers
17821 E. 17th Street, Suite 245,  Tustin, CA 92780  (714) 731-9455

EXCEPTIONS TO AGREEMENT

Page 165 of 378 ends

17.F

Page 1583 of 2581 ends

00092061.2
SECTION 17. INDEMNIFICATION
(a) To the fullest extent permitted by law, Consultant shall indemnify, protect, defend (with legal counsel reasonably selected by the City) and hold harmless City and any and all of its elected and appointed officials, officers, employees, representatives and agents (“Indemnified Parties”) from and against any and all claims, actions and proceedings (whether at law or equity, administrative or judicial), demands, orders, judgments, losses, injuries (including, without limitation, injury to or death of an employee of Consultant or sub consultants), liabilities of every kind (including, without limitation, incidental and consequential damages, court costs, and litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and cost of investigation), damages, costs and expenses, including attorney’s fees and costs, (collectively "Claims") that arise out of, pertain to, or relate to, directly or indirectly, in whole or in part, negligent performance of Services by Consultant, its officers, agents, employees, representatives, sub consultants, anyone directly or indirectly employed by any of them, or anyone that they control. Consultant’s duty to indemnify, protect, defend, and hold harmless Indemnified Parties, shall not include any Claims arising from the sole negligence or willful misconduct of the Indemnified Parties. (b) Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this section from each and every sub consultant, subcontractor, or any other person or entity involved by, for, with, or on behalf of Consultant in the performance of this Agreement naming the Indemnified Parties as additional indemnitees. In the event Consultant fails to obtain such indemnity obligations from others as required here, Consultant agrees to be fully responsible according to the terms of this section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth herein is binding on the successors, assigns, or heirs of Consultant and shall survive the termination of this Agreement and this section.

SECTION 18. INSURANCE
Consultant agrees to obtain and maintain in full force and effect during the Term of this Agreement the insurance policies set forth in Exhibit “C” “Insurance” and made a part of this Agreement. All insurance policies shall be subject to approval by City as to form and content.

These requirements are subject to amendment or waiver if so approved in writing by the City Manager. Consultant agrees to provide City with copies of required policies upon request.

SECTION 19. ASSIGNMENT
Add word
'negligent'

Page 166 of 378 ends

17.F

Page 1584 of 2581 ends

Hartzog & Crabill, Inc.

Consulting Traffic Engineers
17821 E. 17th Street, Suite 245,  Tustin, CA 92780  (714) 731-9455

RESUMES

Page 167 of 378 ends

17.F

Page 1585 of 2581 ends

Gerald J. Stock, PE, TE
Executive Vice-President
RESUME
Years of Experience: 30
Education:
1989 BSCE, Civil Engineering,
University of Colorado, Denver
1978 BS, Geology,
California State University, Long Beach
Professional Registrations &
Certifications:

Registered Civil Engineer–California
No. 52822
Registered Traffic Engineer–California
No. 2049
Chi Epsilon – 1989
Professional Affiliations:

American Public Works Association
American Society of Civil Engineers
Mr. Stock is Executive Vice President with the consulting firm of Hartzog & Crabill, Inc. (HCI) in charge of city and traffic engineering services. He provides consulting to public agencies from both a technical and organizational perspective. Mr. Stock’s background includes a broad array of municipal projects from project conception through completion. He has directed city staffs in both long-term capital project planning as well as the day-to-day activities associated with managing a municipal engineering department.

Mr. Stock’s experience includes over (30) years of project management, capital improvement planning, design, and contract administration. He is well-versed in both the technical and the political challenges of municipal engineering activities.

Mr. Stock has recently completed Engineering and Traffic surveys for the Cities of San Juan Capistrano, South Gate, Indian Wells, Laguna Niguel, and San Gabriel, and in prior years in Bellflower, Hermosa Beach, Laguna Hills, Monrovia, Monterey Park, Moorpark, Villa Park, and Yucaipa. In every case, the project was completed on time and on budget.

Administration:

Since 2000, Mr. Stock has served the City of Bellflower as contract City Engineer and City Traffic Engineer. Mr. Stock also serves the City of Hermosa Beach as on-call Traffic Engineer. Prior to joining HCI, Mr.

Stock was employed by the City of Norwalk as their in-house City Engineer. Mr. Stock represents the Engineering/Public Works Department before the Public Safety and Planning Commissions, as well as the City Council for his client cities.

Mr. Stock has directed City staffs and consultants regarding the administration of client city’s Congestion Management Program, NPDES activities, grant applications and grant administration, underground utility districts, and pipeline/utility franchises.

Transportation:

Most recently, Mr. Stock oversaw the design and construction of the widening of Bellflower Boulevard, between Artesia Boulevard and the SR91 Freeway ramps, using Measure R funds via the SR-91/I-605 Freeway/I405 Freeway Technical Advisory Committee.

Mr. Stock prepared intersection widening plans in the City of Laguna Hills, as well as completed the Engineering and Traffic Surveys for Speed Limits in the Cities of Laguna Hills, Laguna Niguel, San Juan Capistrano, and Yorba Linda.

The City of Bellflower selected Mr. Stock to represent the City on the technical advisory committee (TAC) of the SR-91/I-605 Needs Assessment Major Corridor Study. As vice-chair of the TAC, Mr. Stock’s role is to ensure that the City’s interests are protected during the planning and development of major improvements along the SR-91and I-605 Freeways in Bellflower.

Page 168 of 378 ends

17.F

Page 1586 of 2581 ends

Scott Q. Ma, PE, TE
Senior Engineer
RESUME
Years of Experience: 20
Education:
2002 BSCE, Civil Engineering,
University of California, Berkeley
Professional Registrations &
Certifications:

Registered Civil Engineer–California
No. 70812
Registered Traffic Engineer–California
No. 2519
Professional Affiliations:

Institute of Transportation Engineers
Member, Orange County Traffic
Engineering Council (OCTEC)
Mr. Scott Ma is a Senior Engineer with the traffic engineering consulting firm of Hartzog & Crabill, Inc (HCI). Mr. Ma is a registered Civil and Traffic Engineer with the State of California, and has over (20) years of engineering experience. Mr. Ma has a wide breadth of experience in the field of traffic engineering and transportation planning.

Traffic Engineering
Mr. Ma’s responsibilities are to provide project management and design expertise for various traffic-related projects. Mr. Ma’s experience includes the preparation of Plans, Specifications and Estimates (PS&E) for numerous projects throughout Southern California. These include traffic signal plans, traffic control plans, road improvement plans, and signing and striping plans.

Mr. Ma has experience in signal operations and the development, implementation and calibration of coordination timing plans. Mr. Ma has also conducted Engineering and Traffic Surveys (E&TS), traffic signal warrant studies, multiway stop warrant studies, and traffic index (TI) calculations.

Transportation Planning
Mr. Ma has prepared numerous traffic impact studies, queuing studies, and shared parking studies for development projects. Mr. Ma has also participated and provided his traffic knowledge in the development of General Plans/Mobility Plans, Bicycle Master Plans, and Safe Route to School Plans.

Municipal Engineering
Mr. Ma is currently serving the Cities of Lake Forest and Hermosa Beach as consulting Traffic Engineer. He previously served as consulting Traffic Engineer for the City of South Gate. In his role, he has assisted city staff in the development of long-term Capital Improvement Programs (CIPs) as well as the day-to-day activities such as traffic-related requests from residents.

Mr. Ma has applied his traffic expertise to provide plan check services, process Encroachment Permits, implement permit parking programs and review private development plans.

Representative Projects List
 City of Commerce, HSIP Traffic Signal Modification Plans for Four (4) Intersection
 City of Commerce, Class II Bike Lanes Striping Plans for Eastern Avenue, Commerce Way and Harbor Street
 City of Bellflower, Traffic Signal Plans for Four (4) Intersections on Lakewood Boulevard
 City of Bellflower, Bellflower Boulevard and Cedar Avenue Traffic Signal Plan
 City of Yucaipa, Live Oak Canyon Road and Outer Highway 10 South Traffic Signal Plan
 City of Indio, 35 Arterial Highways and Local Streets for Signing and Striping Plans for Bicycle Facilities
 City of Hermosa Beach, On-Call Traffic Engineering Services, Consulting Traffic Engineer
 City of Lake Forest, On-Call Traffic Engineering Services, Consulting Traffic Engineer

Page 169 of 378 ends

17.F

Page 1587 of 2581 ends

Michael A. Vallado
Associate Engineer
RESUME
Years of Experience: 22
Education:

BSCE – Civil Engineering, 1997
California State University, CA
Professional Affiliations:

City Traffic Engineers (CTE)
Member, Orange County Traffic
Engineering Council (OCTEC)
Traffic Signal Association (TSA) for
Los Angeles, Orange, Riverside, and San
Bernardino Counties
Mr. Vallado brings over (22) years of civil engineering experience specifically related to traffic engineering and signal design.

Five (5) of these years were devoted to managing the City of Glendora’s Traffic Engineering section, while the last (17) years have been with Hartzog & Crabill, Inc. (HCI).

Mr. Vallado’s responsibilities with HCI include conducting trafficengineering warrant studies, developing traffic Level-of-Service (LOS) operational analysis reports and providing recommendations, preparing specifications, and project management of final preparation of project plans, specifications and estimates (PS&E) to client cities.

Mr. Vallado has also assisted with the construction management of several traffic signal construction projects for various client cities.

PRIOR EXPERIENCE:

City of Glendora, Public Works Department, Glendora, CA 1999-2003 Civil Engineering Assistant-Traffic
 Maintained the operations of forty (40) traffic signals in the city.  Administered the entire process of the Traffic Safety Committee, including preparing the Agenda, gathering data for initial staff recommendations, notifying all affected residents, reserving Council Chambers, transcribing minutes from the meeting for City Council approval, and implementing all approved changes by issuing work orders.
 Designed and prepared plans, specifications, and estimates for new traffic signals, signal upgrades, and signing/striping projects.  Managed the duties of a Traffic Engineering Aide to assist in all aspects of the Traffic Engineering Division.
 Developed and implemented a new Preferential Parking District for residents in the vicinity of Glendora High School.
 Inspected sight-distance requests regarding traffic issues.  Oversaw the speed hump design and installation project on Ada Ave between Cullen Ave and Glenwood Ave.
 Reviewed traffic control plans for all different types of project developments.

Scienscope International, Inc., Walnut, CA 1998-1999
Product Manager
 Developed and produced specifications and owner’s manuals for all optical engineering products manufactured/sold.
 Answered technical information from company distributors and customers regarding manufactured products.
 Attended product trade shows in various cities and states to display/promote optical products and meet with clients.  Assisted with marketing/advertising of all products in company Internet website, magazines, registers and suppliers handbooks.  Translated catalog information into Spanish for customer base in Mexico and South America.

Page 170 of 378 ends

17.F

Page 1588 of 2581 ends

Greg Cabey
Traffic Signal Systems
Supervisor
Years of Experience: 31
Education:

Associate of Arts–Technical Electronics,
Fullerton College, California, 1981
Professional Affiliations:

Treasurer,
Traffic Signal Association (TSA)
Orange County Chapter
Member, International Municipal Signal
Association (IMSA)
Certified as a Traffic Signal Inspector and
Level III Traffic Signal Technician
RESUME
Mr. Greg Cabey brings over (31) years of traffic signal experience to the Hartzog & Crabill, Inc. (HCI) project team specializing in signal communications systems, timing development, implementation and finetuning of coordination timing.

Greg frequently assists client cities with reviewing numerous OCTA TSSP corridor projects under development by other consultants. The Imperial Highway and Los Alisos Boulevard TSSP projects are two current examples of projects where Greg is assisting our client cities with review of another consultants’ timing development as well as providing construction support.

Prior to the last (19) years working with HCI, Greg was a Signal Maintenance Lead-man for Peek Traffic for over (12) years. Greg’s extensive field experience with signal systems and all types of signal controller functions will aid in the success of any traffic signal coordination-type project.

RELEVANT EXPERIENCE:

Traffic Signal Operations Management (9 Cities, CA) On-Going – Greg provides assistance to Mr. Trammell Hartzog in regards to traffic signal timing and operations monitoring services for the Cities of Cerritos, Cypress, Indian Wells, Moorpark, Rancho Santa Margarita, San Juan Capistrano, Stanton, Tustin, and Yorba Linda. His responsibilities include daily reviewing and comparing of timing to verify if all traffic signals are in good working order. Any malfunctions logged are quickly reported to the City’s designated agency or traffic signal maintenance contractor for dispatch. Greg also analyzes historical data in order to identify traffic volumes and patterns to assist in determining if an adjustment to signal timing is necessary. Greg verifies if timing is programmed correctly in each master and controller. His on-going monitoring and maintenance services of signal timing for these city agencies combine to approximately (500) signalized intersections.

Ball Road-Taft Avenue Traffic Signal Synchronization Project (OCTA, Various Orange County Agencies) 2019. This TSSP project involved coordinating (38) intersections within Cities of Anaheim, Orange, and Caltrans.

Kraemer Avenue/Glassell Street/Grand Avenue Traffic Signal Synchronization Project (OCTA, Various Orange County Agencies) 2018. This TSSP project involved coordinating (61) intersections within Cities of Brea, Placentia, Yorba Linda, Santa Ana, and Caltrans.

Del Obispo Street Traffic Signal Synchronization Project (OCTA, Cities of San Juan Capistrano & Dana Point) 2016. This TSSP project involved coordinating (16) intersections along a 3.6 mile segment.

Paseo de Valencia Traffic Signal Synchronization Project (OCTA, Led by City of Laguna Hills) 2015. This TSSP project involved providing traffic signal coordination timing for (12) intersections along 3.3 miles.

Page 171 of 378 ends

17.F

Page 1589 of 2581 ends

PROPOSAL TO PROVIDE TRANSPORTATION PLANNING AND TRAFFIC ENGINEERING

CONSULTING SERVICES FOR THE

ON-CALL TRAFFIC ENGINEERING

SERVICES FOR THE CITY OF HEMET
JULY 16, 2024

Page 172 of 378 ends

17.F

Page 1590 of 2581 ends

TABLE OF CONTENTS
Page i

Page 1 ends
Page 15 ends
Page 25 ends

Appx A
• Cover Letter
1 • Experience
2 • Personnel
3 • Fee Schedule
A
• Resumes

Page 173 of 378 ends

17.F

Page 1591 of 2581 ends

COVER LETTER

Page 174 of 378 ends

17.F

Page 1592 of 2581 ends

City of Hemet | Linscott, Law & Greenspan, Engineers i
Cover Letter I II III A

COVER LETTER
July 16, 2024
TO:

Ms. Candace Sunds – Purchasing Division
City of Hemet
445 East Florida Avenue
Hemet, CA 92543
(951) 765-2348
[email protected]
FROM:

Linscott, Law & Greenspan, Engineers
2 Executive Circle, Suite 250
Irvine, CA 92614
(949) 825-6175
LLG Reference: P2.24.0199.1
SUBJECT: Proposal for the City of Hemet On-Call Traffic Engineering Services Dear Ms. Sunds:

Linscott, Law & Greenspan, Engineers (LLG) is pleased to submit this proposal to provide Traffic Engineering & Transportation Planning On-Call consulting services to the City of Hemet (City), Riverside County, California as outlined in the Request for Proposals (RFP) dated June 19, 2024. LLG offers the City innovative, highly effective and comprehensive consultancy services for this assignment. Our approach focuses on communication, insightful and accurate services, timely delivery of work products and anticipation of issues.

LLG has been providing and continues to provide, insightful, accurate and innovative traffic engineering and transportation planning solutions that emphasize the importance of safe, equitable and efficient mobility for the traveling public for the past 57 years. Our success comes from representing the public’s best interest and challenging ourselves to grow personally and professionally in a collegial environment. Since our founding in 1966, in excess of 15,000 engagements have been completed involving a wide variety of projects throughout the United States and Overseas. We cherish our history and look forward to evolving and continuing to work in partnership with public agencies by also providing On-Call Traffic Engineering & Transportation Planning consulting services and support that include context-sensitive and holistic solutions to address transportation and mobility planning issues.

There are numerous reasons why we believe the City would be best served by the LLG team, some of which are summarized below:
- Project Experience and Technical Competence – Having completed more than 15,000 transportation and traffic impact analysis reports, travel demand modeling projects, as well as design projects, for several agencies in the region, we are prepared to address the critical issues and provide comprehensive consulting services. We pride ourselves in our capabilities of providing innovative approaches and accurate technical analyses.
- Grant Writing Experience – LLG has extensive experience in grant writing and has helped prepare several State, Federal and Tribal Governments grant applications, including, in the last cycles that were awarded. - Project Team – Keil D. Maberry, P.E. will be your Principal-in-Charge and Zawwar Saiyed, M.S., P.E., R.S.P., will be the day-to-day Project Manager. Keil and Zawwar are both registered Traffic Engineers in the State of

Page 175 of 378 ends

17.F

Page 1593 of 2581 ends

City of Hemet | Linscott, Law & Greenspan, Engineers ii Cover Letter I II III A
California. The Irvine office of LLG will primarily work on this engagement, with resources available from the San Diego and Pasadena offices if and when support is needed. - Expertise – LLG has recognized technical ability and expertise in all areas of traffic engineering and planning and is focused on providing implementable solutions to meet the City’s needs. - Qualifications and Approach to Work – We possess all the required qualifications, competence and capabilities to provide well rounded comprehensive consulting services. We have identified several key approaches in order to ensure comprehensive, innovative, high-quality services are provided while adhering to the schedule and budget.
- Local Experience – LLG has a broad range of recent local experience, as we have successfully completed many transportation planning, travel demand modeling and operations projects in the City of Hemet, adjacent Cities and Riverside County over the past several decades. LLG has good and long-standing working relationship with the City and we believe that our experience and familiarity with the City staff, the City policies/procedures and our understanding of the City processes will assuredly assist in expediting the process.
- Proposed Methodology and Approach to Work – We possess the required qualifications, competence, and capabilities to provide well-rounded, comprehensive consulting services. We have identified several critical approaches within the proposal to ensure comprehensive, innovative, and high-quality services while adhering to the schedule and budget.
- Staff Qualifications and Certifications – LLG has a full range of staffing resources tailored for addressing the unique needs of a given assignment. LLG Principals and Senior Staff are recognized experts in transportation planning and traffic engineering and possess professional registration in Traffic Engineering, Civil Engineering, or both as well as possessing Road Safety Professional (RSP) Certification from the Transportation Professional Certification Board.

We take no exceptions to the terms and conditions of the RFP (inclusive of the City of Hemet Professional Services Agreement), acknowledge that we are obligated by all of the RFP addenda and will commit to comply with all relevant local/state/federal laws, regulations, and ordinances applicable to the work. Please note that this Proposal is valid for a period of 120 calendar days from the date of submission and all information in this Proposal is true and correct. We appreciate the opportunity to submit this proposal. Please call us at (949) 825-6175 if you have any questions/comments regarding this proposal.

Sincerely,

LINSCOTT, LAW & GREENSPAN, ENGINEERS
Keil D. Maberry, P.E.

Principal
[email protected]
California Registration TR 1802
Zawwar Saiyed, P.E.

Associate Principal
[email protected]
California Registration: TR 2525

Page 176 of 378 ends

17.F

Page 1594 of 2581 ends

SECTION I

EXPERIENCE

Page 177 of 378 ends

17.F

Page 1595 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 1
Cover Letter I II III A
I. EXPERIENCE
Linscott, Law & Greenspan, Engineers (LLG) is pleased to have the opportunity to submit this proposal to provide Transportation Planning and Traffic Engineering consulting services for the City of Hemet On-Call Traffic Engineering Services. LLG Principals and Senior Staff are recognized experts in these practice areas and possess professional registration in Traffic Engineering, Civil Engineering, or both as well as possessing Road Safety Professional (RSP) Certification from the Transportation Professional Certification Board. We pride ourselves on our fresh and dynamic perspective that contributes to innovative approaches and accurate technical analyses. For this project, LLG believes that the most critical elements to consider are Our Team, Our Method and Our Experience. It should be noted that LLG has never been terminated from an contract.

OUR TEAM
Linscott, Law & Greenspan, Engineers (LLG), is a DBA for LG2WB Engineers, Inc., a California corporation, established in 1966. LLG is also a certified Small Business Enterprise (SBE) with the State of California. LLG is a well-respected firm of medium size, comprised of approximately sixtyfive (65) dedicated professionals who serve our clients on a wide variety of traffic, transportation and parking issues. The Irvine office of LLG will primarily work on this engagement, with resources available from the San Diego and Pasadena offices if and when support is needed.

Since our founding in 1966, over 15,000 projects have been completed. Our team is the right mix of proven track records, organic collaboration, and opportunities for fresh perspectives, and a unique skill set. Keil Maberry, with over 37 years of experience working on similar projects, will be the Principal-in-Charge and Zawwar Saiyed, with over 23 years, will be the day-to-day Project Manager for this important project. Their wide technical bandwidth, management culture, implementation skills, political astuteness, and commitment to safe and resilient communities will serve the City well. LLG will be supported by a team to ensure a quality product is delivered expeditiously. Also, LLG’s breadth and depth of staff provides a pool of knowledge, talent, and capacity options.

Our diverse experience and expertise enable us to provide services to both public agencies and the private sector.

Project organization is structured so that Principals and Senior Staff maintain direct involvement from project initiation to completion, ensuring a quality product that is clear, easily understood and will support the City needs and Stakeholder engagement process, if needed.

OUR METHOD
LLG’s experience on similar contracts has led to developing methods to accomplish project tasks on-time and within budget. First, we will ensure our understanding of the City’s goals, policies, practices, and expectations concerning our tasks. We also prioritize making strong personal contacts with key staff at the City to ensure reliable communication from the start. Next, we leverage our large team’s talent to put the right people on the right tasks. Finally, our rigorous quality control process is applied to ensure that the City receives the best product for the best value on every task assigned. We “The Commission was
very pleased with the
presentation and was
very complimentary of
LLG. Thanks for all
your support in
getting the project
approved.”
City of Chino Hills

Page 178 of 378 ends

17.F

Page 1596 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 2
Cover Letter I II III A
will implement the critical approaches shown to the right to ensure success and meaningful project outcomes.

This comprehensive and holistic approach has proven positive results on project outcome, cost, and schedule.

OUR EXPERIENCE
Our work differentiates us from others as we remain focused on data-driven, research-inspired, implementable solutions that speak to the community. Included in our team are safety experts who stay connected through active participation in professional societies and cutting-edge research.

From data science analytics, predictive video safety, countermeasure research, to local roadway safety plans, we are ready to assist the City with traffic engineering and transportation planning projects. As you read forth and check references, you will find that LLG’s reputation is that of the most qualified, responsible and responsive specialized transportation planning and traffic engineering firm, currently providing on-call consulting services to Western Riverside Council of Governments (WRCOG), San Gabriel Valley Council of Governments (SGVCOG), Federally recognized Native American Tribal Governments, as well as many municipalities in Orange County (Fullerton, Brea, Anaheim, Dana Point, San Juan Capistrano), County of San Deigo, City of Long Beach, City of Chino Hills, City of Corona and Riverside County. We look forward to the opportunity to serve the City.

Page 179 of 378 ends

17.F

Page 1597 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 3
Cover Letter I II III A

FIRM PROFILE & QUALIFICATIONS
Linscott, Law & Greenspan, Engineers (LLG) a Small Business Enterprise (SBE), provides state of the art transportation planning, traffic engineering and parking consulting services. Our diverse experience and expertise enable us to provide services to both public agencies and the private sector. Project organization is structured so that Principals and Senior Staff maintain direct involvement from project initiation to completion, ensuring a quality product that is clear, easily understood and will support the project’s needs and the public review process. Since our founding in 1966, in excess of 15,000 engagements have been completed involving a wide variety of projects throughout the United States and Overseas, with the core of our practice in Southern California. LLG’s specialties are listed to the right.

We provide insightful, accurate and innovate transportation planning and traffic engineering solutions that emphasize the importance of safe, equitable and efficient mobility for the traveling public. Our success comes from representing the public’s best interest and challenging ourselves to grow personally and professionally in a collegial environment. Quality and a successful outcome are LLG’s primary objectives for this project.

LLG is a multiple award-winning firm that is always striving to best serve our clients. The quality of our work resonates with our peers and has been recognized by the above organizations
LLG’S SPECIALTIES
- Traffic Impact Analysis Reports
- As-Needed On-Call Services
- Mobility Studies
- Vehicle Miles Traveled (VMT)
Analyses
- General Plans and Specific Plans
- Pedestrian/Bicycle Planning
- Transportation Master Planning
- Multi-Modal Planning & Analyses
- Site Access and Circulation
- Preliminary/Conceptual
Engineering
- Complete Streets Analyses
- Local Planning Group
Presentation
- Road Safety Reviews
- Travel Demand Modeling
- Traffic Signal Design
- Traffic Signing/Striping Design
- Construction Zone Traffic Control
Plans
- Parking Design and Planning
- Traffic Planning and Operations
Studies
- 2D & 3D Traffic Simulation
- Traffic Calming
- Shared Parking Demand
Forecasting
- Integration of Alternative Modes
- Circulation Elements for General
Plans and Specific Plans
- Roundabout Analysis and Design
- Congestion Management
Program (CMP)
- Transportation Demand
Management (TDM)
- Traffic Signal Warrant Studies
- Local Road Safety Plans (VZAP)
- Active Transportation Plans (ATP)
- Long Range Transportation Plans
(LRTP)

Page 180 of 378 ends

17.F

Page 1598 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 4
Cover Letter I II III A

FIRM OVERVIEW
Below are the firm specifics, as requested in the RFP:

YEARS IN BUSINESS: 58 Years (Founded 1966)
TYPE OF BUSINESS: S-Corporation

LIST OF OWNERS & PRINCIPAL
MEMBERS:

David S. Shender, P.E.

John Boarman, P.E.

Richard E. Barretto, P.E.

Keil Maberry, P.E.

Kaylan Yellapu, P.E.

Dave Roseman, P.E.

Shankar Ramakrishnan, P.E.

Dan Kloos, P.E.

Zawwar Saiyed, P.E.

OFFICE LOCATIONS:

Pasadena:
600 South Lake Avenue, Suite 500
Pasadena, CA 91106
(626) 796-2322
Irvine:
2 Executive Circle, Suite 250
Irvine, CA 92614
(949) 825-6175
San Diego:
4542 Ruffner Street, Suite 100
San Diego, CA 92111
(858) 300-8800

LOCATION OF OFFICE THROUGH

WHICH SERVICES WILL BE
PROVIDED:

Irvine:
2 Executive Circle, Suite 250
Irvine, CA 92614
(949) 825-6175
PRINCIPAL IN-CHARGE:

Keil D. Maberry, P.E.
[email protected]
(949) 825-6175 x228
NUMBER OF EMPLOYEES: 65
SERVICES PROVIDED: Transportation Planning, Traffic Engineering, Travel Demand Modeling and Parking Consulting Services

Page 181 of 378 ends

17.F

Page 1599 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 5
Cover Letter I II III A

FIRM EXPERIENCE
There are numerous reasons why the LLG team would best serve the City. To assist the City’s Selection Committee, the three key reasons to select our team are summarized below. Our relevant project experiences are detailed in the subsequent pages.

LOCAL KNOWLEDGE
Having worked on numerous projects all throughout
California, including the City of Hemet, LLG understands the need for intimate knowledge of the area’s
transportation needs and familiarity with transportation infrastructure in the area. Communication, collaboration efforts and the support of stakeholders such as the
residents, adjacent Cities, Riverside County and Caltrans would be an important aspect to this project.

TECHNICAL EXPERIENCE
Having provided a variety of transportation planning and traffic engineering services for public agencies and private sector clients, our team is prepared to complete the tasks at hand, address the critical issues and provide comprehensive consulting services. Our work differentiates us from others as we remain focused on data-driven, context sensitive, implementable solutions that meets the City’s needs.

PUBLIC AGENCY WORK
The LLG team has completed a broad
range of transportation planning and
traffic engineering projects for many
public agencies in California. We are
passionate about all of our projects,
meeting client’s goals and exceeding
expectations for service.

THE LLG TEAM

Page 182 of 378 ends

17.F

Page 1600 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 6
Cover Letter I II III A

REPRESENTATIVE PROJECTS EXPERIENCE
LOCAL ROADWAY SAFETY PLANS (LRSP) FOR 23 COMMUNITIES IN THE COUNTY OF SAN DIEGO LLG recently completed a comprehensive local roadway safety plan for the County of San Diego. This project involves conducting a holistic systemic safety assessment for the County with focused assessments for each of the 23 unincorporated planning communities listed below:
- Alpine - North Mountain
- Bonsall - Otay
- Central Mountain - Pala Pauma
- Crest Dehesa - Pendleton De Luz
- County Islands - Rainbow
- Desert - Ramona
- Fallbrook - San Dieguito
- Jamul Dulzura - Spring Valley
- Julian - Sweetwater
- Lakeside - Valley Center
- Mountain Empire - Valle De Oro
- North County Metro
LLG processed over 17,000 collision data points that occurred in both rural and urban areas within the County of San Diego. With use of GIS and Excel software, LLG processed data by translating the information and extracting relevant information from each collision. With so many collisions and hierarchal information for each collision, the key to successful review and analysis of the data is a clear process and good data management practices.

Using GIS and pertinent shapefiles, LLG mapped out the collision data for each community. The GIS collision figures included the following key elements:
- All Intersection/Segment Collisions
- Mode Share by Census Track
- Pedestrians Involved Collisions (All and Youth)
- Bicyclist Involved Collisions (All and Youth)
- Senior Involved Collisions
While maps assisted with evaluating determining any "hot spot" intersection and segments, the trends analysis helped with understanding over-represented collision trends on County maintained roadways. Up to 50 types of queries were conducted with the data available, which helped identify data-driven emphasis areas. The

Page 183 of 378 ends

17.F

Page 1601 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 7
Cover Letter I II III A
LOCAL ROADWAY SAFETY PLANS (LRSP) FOR 23 COMMUNITIES IN THE COUNTY OF SAN DIEGO collision analysis also calculated the collision rate
for various roadways and intersections and
identifies collision trends by type, demographics,
locations, and other parameters.

LLG developed a process to help determine the top
10 intersection and top 10 segment locations. This
process is unique as it will consider the collision
frequency and collision rate and factor in
severity/vulnerable users and the healthy place
index. This ensures that locations for focused
assessment and improvements are chosen
equitably.

Based on the analysis findings and in-depth assessment of potential human-related risk factors or contributing roadway factors, and input from various stakeholders, LLG determined a set of recommended proven countermeasures, policies, and strategies. LLG
collaborated closely with County staff in the
Engineering, Planning, and Public Health
departments. These recommendations are
consistent with the emphasis areas identified and the
4E approach to roadway safety.

LLG is currently assisting the County with the Active
Transportation Plan (ATP), Highway Safety
Improvement (HISP), and Safe Streets for All (SS4A)
grants. This includes assisting with the application,
data analytics, concept plans, and cost estimates.

Page 184 of 378 ends

17.F

Page 1602 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 8
Cover Letter I II III A

CITY OF GRAND TERRACE ACTIVE TRANSPORTATION PLAN
LLG along with KTU+A prepared the preliminary engineering designs of two selected corridors in Barton Road and Mount Vernon Avenue that will be utilized for grant applications. Utilized a variety of active transportation tools and references such as Urban Bikeway Design Guide and Urban Street Design Guide, as well as experience in multiple jurisdictions revolving around enhancing pedestrian and bicycle safety. The preliminary engineering designs included intersection and roadway segment analysis to determine intensity of vehicles as well as interaction with pedestrian and bicyclists. Trends associated with vehicular and pedestrian/bicycle volume were also analyzed to develop location and implementation of enhanced pedestrian crosswalks, green pavement, bicycle detectors, etc. Additional duties include outreach coordination, public workshop, pop-up event and safe routes to school coordination and facilitation in conjunction with KTU+A. Additionally, LLG prepared detailed engineering cost estimates for the Barton Road and Mount Vernon Avenue priority projects in conjunction with the ATP Grant Application for Caltrans. These cost estimates included a comprehensive breakdown of general construction items, Project Approval and Environmental Documents (PA&ED) costs, Plans Specifications and Estimates (PS&E) costs, Right-of-way Engineering and Construction Engineering (CE) costs.

Page 185 of 378 ends

17.F

Page 1603 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 9
Cover Letter I II III A

CITY OF CHINO PEDESTRIAN AND BICYCLE MASTER PLAN
LLG along with KTU+A evaluated mobility for non-motorized users throughout the City of Chino. Based on the evaluation of the existing conditions, collision data, usage data, and community input, the project team developed recommendations to complete and enhance the existing bicycle and pedestrian network. After the prioritization of all projects, the team selected the Telephone Avenue Bicycle Boulevard Neighborhood Greenway project due to its proximity to schools, connectivity to other existing and proposed bicycle facilities and its proximity to the City’s Core. LLG prepared the concept plan for the Telephone Avenue Bicycle Boulevard Neighborhood Greenway project. The concept plan included recommendation such as parking buffers, bike boxes, chicanes, bulb-outs, in-roadway lights, high-visibility crosswalks, a mini-roundabout, rectangular rapid flashing beacons, signage and
pavement markings, and other
features aimed to calm traffic and
improve safety and connectivity of
the of the boulevard for bicyclist and
pedestrians.

Page 186 of 378 ends

17.F

Page 1604 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 10 Cover Letter I II III A
CITY OF HUNTINGTON BEACH SB 743 IMPLEMENTATION PROGRAM GUIDELINES LLG prepared the City of Huntington Beach VMT Guidelines which are generally based on the recommendations provided in the OPR Technical Advisory on Evaluation Transportation Impacts in CEQA (dated December 2018), and the County of Orange Transportation Implementation Manual (dated September 2021). The VMT Guidelines have been tailored to serve the local land use conditions and the General Plan goals and policies adopted for the City of Huntington Beach.

The VMT for the City of Huntington Beach has been calculated by summing the distance traveled by all types of vehicles, including passenger cars, trucks, buses, and motorcycles, within a given area over a specific time period. For land development projects, VMT is simply the product of the daily trips generated by new development and the distance those trips travel to their destinations.

This document will present the VMT methodology, thresholds for project-specific and cumulative impacts, and TDM mitigation measures the City will use for CEQA. LLG will also develop a toolbox of mitigation measures compliant with the revised CEQA guidelines
(i.e., TDM strategies), and identify
quantifiable levels of effectiveness.

Further, this document serve as a
guide for land development projects
and analyzes the potential
transportation impact by the
adopted screening criteria, VMT
methodology, and threshold within
the city of Huntington Beach that
requires environmental review in
compliance with CEQA. The main
objectives of the VMT guidelines are
to reduce VMT, promote sustainable
transportation modes, and achieve
environmental, social, and economic
benefits.

The Orange County Transportation
Analysis Model 5.0 (OCTAM 5.0) was
be utilized to develop regional and
local area VMT data metrics and
thresholds.

Page 187 of 378 ends

17.F

Page 1605 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 11 Cover Letter I II III A

ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) TRAVEL DEMAND MANAGEMENT (TDM)

TOOLBOX SUPPORT SERVICES
LLG is providing support to the Orange County Transportation Authority (OCTA) to develop a tool for evaluating Vehicle Miles Traveled (VMT) reductions resulting from the Transportation Demand Management (TDM) measures as provided in the California Air Pollution Control Officers Association (CAPCOA) Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity, Designed for Local Governments, Communities, and Project Developers (dated December 2021). The toolbox will incorporate the latest quantification methodologies, default assumptions, and elasticities provided in the 2021 Handbook. As part of the update process, LLG will incorporate additional features in order to provide additional flexibility in the analysis while preserving the clarity of the final results and improving the overall user experience. The tool will provide dynamic filtering to identify potentially applicable TDM measures based on parameters provided by the user (e.g., the scale of application, locational context, and residential/nonresidential for development projects). The TDM toolbox will incorporate robust data validation and error handling, provide both pop-up and footnoted warnings for incompatible or mutually exclusive measures, alerts users when maximum reduction caps are reached, and provide an automated summary and reporting for the selected measures. The LLG development team will also provide group OCTA training on the use of the proprietary tool, and will prepare video tutorials which are envisioned to serve as on-demand refresher courses for infrequent users as well as training for new users going forward.

Page 188 of 378 ends

17.F

Page 1606 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 12 Cover Letter I II III A

CITY OF LAGUNA NIGUEL GENERAL PLAN UPDATE TRAFFIC STUDY LLG is currently working on the City of Laguna Niguel General Plan Update Traffic Study that analyzes the Existing, Current General Plan Buildout, Proposed General Plan Buildout and Alternate General Plan Buildout Traffic Conditions. This Traffic Study included the update of the Orange County Transportation Analysis Model (OCTAM 5.0) which included verifying and converting all the development totals within the City into Socioeconomic Data (SED), and coding the appropriate land uses, transit and network assumptions into the baseline and cumulative traffic conditions to generate future year forecast volumes, VMT screening maps and analyses.

Further, this Traffic Study presents the
existing and future operating conditions
Level of Service (LOS) operations at fiftyfive (55) intersections and thirty-four (34) roadway segments throughout the City of
Laguna Niguel and its adjacent
jurisdictions, Vehicle Miles Traveled (VMT)
analyses that include all the TAZs within
the City, Transportation Demand
Management (TDM) strategies and
mitigation measures.

Page 189 of 378 ends

17.F

Page 1607 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 13 Cover Letter I II III A

CITY OF CHINO HILLS GENERAL PLAN UPDATE VEHICLES MILES TRAVELED (VMT) STUDY LLG is currently working on the Vehicle Miles Traveled (VMT) Analysis Study for the proposed Chino Hill General Plan Update project. The project includes Transportation Demand Modeling using the San Bernardino County Transportation Analysis Model (SBTAM) as provided by San Bernardino County Transportation Authority (SBCTA), VMT analyses for all Traffic Analysis Zones (TAZs) within the City, VMT screening criteria, analysis methodology, significance thresholds and TDM reduction strategies.

The Project is an adaptation of the 6th Cycle Housing Element of the Chino Hills General Plan. The state Department of Housing and Community Development (HCD) has allocated 3,729 housing units to the City of Chino Hills as part of the Regional Housing Needs Assessment process (RHNA).

Page 190 of 378 ends

17.F

Page 1608 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 14 Cover Letter I II III A

REFERENCES
We welcome you to contact our references and re-affirm our integrity and reputation, as well as fiscal responsibility. The following summarizes our firm’s most current & ongoing Professional Transportation Planning and Traffic Engineering Consulting Services experience that LLG has been involved in or providing on-call support services for. Also, please note that LLG currently provides on-call services to Western Riverside Council of Governments (WRCOG), San Gabriel Valley Council of Governments (SGVCOG), Cities of Fullerton, Brea, Long Beach and Corona as well and we can provide references for those municipalities upon request.

MR. MATTHEW SINACORI, P.E.

Director of Public Works/City Engineer
LLG currently provides traffic engineering and transportation planning on-call support services for the Public Works
Department of the City of Dana Point. During the past 20 years, LLG staff has been providing professional on-call services related to development/plan check, traffic impact analysis report review, parking demand analysis report review, traffic impact analysis report preparation, parking study preparation and traffic design plan review/preparation.

CITY OF DANA POINT
33282 Street of the Golden Lantern
Dana Point, CA 92629
(949) 248-3574
[email protected]
Completion Date: On-going
MR. RAFAEL COBIAN, P.E., LEED GA
City Traffic Engineer
LLG currently provides traffic engineering and transportation planning on-call support services for the Public Works
Department of the City of Anaheim. LLG staff has been providing professional on-call services related to development/plan check, traffic impact analysis report review, parking demand analysis report review and traffic design plan review/preparation.

CITY OF ANAHEIM
200 S Anaheim Boulevard
Anaheim, CA 92805
(714) 765-4991
[email protected]
Completion Date: On-going
MR. DARREN SAM, P.E.

Senior Traffic Engineer
LLG currently provides traffic engineering and transportation planning on-call support services for the Public Works
Department of the City of Huntington Beach. During the past several years, LLG staff has been providing professional on-call services related to traffic impact analysis report review, traffic impact analysis report preparation, travel demand modeling, VMT analysis/guidelines and traffic design plan preparation.

CITY OF HUNTINGTON BEACH
2000 Main Street
Huntington Beach, CA 92648
(714) 374-1619
[email protected]
Completion Date: On-going
MR. MICHAEL HOFFLINGER
Planning Manager
LLG currently provides traffic engineering and transportation planning on-call support services for the Community
Development Department of the City of Chino Hills. LLG staff has been providing professional on-call services related to development/plan check, traffic impact analysis report review, parking demand analysis report review, traffic design plan review/preparation, travel demand modeling and VMT
analysis/guidelines.

CITY OF CHINO HILLS
14000 City Center Drive
Chino Hills, CA 91709
(909) 364-2777
[email protected]
Completion Date: On-going

Page 191 of 378 ends

17.F

Page 1609 of 2581 ends

SECTION II

PERSONNEL

Page 192 of 378 ends

17.F

Page 1610 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 15 Cover Letter I II III A
II. PERSONNEL

ORGANIZATIONAL CHART
Below illustrates the Project Team organizational chart. Brief descriptions of the key personnel are provided on the following pages. Resumes of key personnel are provided in Appendix A.

Keil Maberry, with over 37 years of experience working on similar projects, will be the Principal-in-Charge and Zawwar Saiyed, with over 23 years, will be the day-to-day Project Manager for this important project.

City of Hemet
Keil D. Maberry, P.E.

Zawwar Saiyed, M.S.,
P.E., R.S.P.

Trissa Allen,
P.E., R.S.P.

Golnaz
Sarram, Ph.D.

Yi Li
Shane Green,
P.E.

Angela Besa,
P.E.

Megan Lam,
P.E.

Felipe Ortega
Natali
Esparza
Kim Preap,
P.E.

Jeremy
Mempin

Page 193 of 378 ends

17.F

Page 1611 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 16 Cover Letter I II III A

KEY PERSONNEL
KEIL D. MABERRY, P.E.

Managing Principal
RELEVANT EXPERIENCE:
- San Manuel Hotel and Casino Expansion,
- Paradise Valley Specific Plan,
- Alberhill Villages Specific Plan
- Morongo Casino Expansion Project
Keil D. Maberry, P.E. who has over 37 years of experience that go beyond simple traffic and parking studies, will be the Managing Principal assigned to this engagement. In addition to having detailed knowledge of widely accepted methodologies and techniques, Keil has extensive experience in operational planning, diagnostics, “trouble shooting”, creative applications and, if necessary, fine tuning and expansion of established procedures. These tasks include evaluation requiring extensive public review, intricate access and circulation networks, expansive study areas with multi-jurisdictional requirements, a wide array of land use types and mixed-use development programs with unique parking and trip-making characteristics and multi-phased projects, mitigation and improvements. Keil has successfully managed numerous projects all throughout southern California.

ZAWWAR SAIYED, M.S., P.E.

Associate Principal
RELEVANT EXPERIENCE:
- Chino Hills LRSP
- Rolling Hills Casino Renovation & Expansion Project & Community Center, - Anaheim Regional Transportation Intermodal Center (ARTIC) Zawwar Saiyed, P.E. earned his Master of Science in Civil Engineering, with a specialization in Traffic Engineering and Transportation Planning, from the University of Arizona, Tucson and has over 23 years of experience working on traffic engineering projects throughout the Southern California region. Mr. Saiyed who has been with LLG for 18 years will be the day to day project manager and will provide project management support, quality control and assessment. Mr. Saiyed has experience in the preparation of safety analyses, traffic impact analysis reports for a variety of land uses, multimodal plans, site access and operational plans, simulation studies, transportation demand modeling, complete streets consultation, parking studies, traffic and parking management plans, General Plan Updates, Specific Plans Updates and Master Plan Updates.

Page 194 of 378 ends

17.F

Page 1612 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 17 Cover Letter I II III A
TRISSA ALLEN, P.E, R.S.P.

Senior Transportation Engineer
RELEVANT EXPERIENCE:
- Globemaster Corridor Specific Plan
- New Long Beach Civic Center
- One World Trade Center
- Pike at Rainbow Harbor
- LRSPs for the City of Fullerton and City of Chino Hills Trissa (de Jesus) Allen, P.E., R.S.P. has been with LLG for over 25 years, and will lead the transportation planning and traffic safety efforts for this engagement. She has over 32 years of experience in the preparation of traffic and parking studies for a variety of land uses, multimodal plans, Active Transportation plans, circulation elements, site access and traffic operational plans, traffic and pedestrian control plans, and parking management plans. She is a licensed Traffic Engineer in the State of California and certified Road Safety Professional. She prepared multimodal funding applications, safety studies, cost estimates, and benefit-cost ratios for HSIP and Metro Call for Projects for the City of Long Beach, in addition to traffic and parking studies for the Globemaster Corridor Specific Plan, New Long Beach Civic Center, One World Trade Center, Pike at Rainbow Harbor, Bike Gap Projects, and residential projects in the City.

SHANE GREEN, P.E.

Senior Transportation Engineer
RELEVANT EXPERIENCE:
- Brea Mall Expansion Project
- Mercury Apartment Project
- Chapman University PMP Report Card
Shane Green, P.E. is a licensed Civil Engineer in the state of California. He earned his Bachelor of Science in Civil Engineering from the University of California, Irvine and has over 17 years of experience working on traffic engineering projects throughout the Southern California region. Mr.

Green has extensive experience in the preparation of traffic impact studies for a variety of land uses, site access and operational plans and parking studies. In addition, he currently provides on-call traffic and transportation engineering consultation services to the City of Dana Point. His expertise in traffic engineering helps LLG continue its tradition of excellence in the region.

Page 195 of 378 ends

17.F

Page 1613 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 18 Cover Letter I II III A

FELIPE ORTEGA
Senior Signal Systems Specialist
RELEVANT EXPERIENCE:
- San Bernardino County Transportation Valley Coordinated Traffic Signal System (SBVCTSS) Program Project
- The Antonio Parkway Project
Felipe Ortega will be the ITS Manager for this project. Mr. Ortega is a recognized expert in traffic signal controller technology and communications systems. He is an essential member of the LLG team, not only because of his expertise in ITS, but also for his extensive knowledge of not only the City of Chino roadways, intersections, equipment, and traffic management system but also all the surrounding Cities, Caltrans and the County. As part of the San Bernardino County Transportation Valley Coordinated Traffic Signal System (SBVCTSS) program, Mr. Ortega has conducted field evaluations of signalized intersections, has implemented both local and coordination timing plans, provided system/timing maintenance and monitoring, as well as specified, purchased, installed, and integrated central traffic signal control software and hardware for each unique signal system for the participating agencies throughout the San Bernardino Valley.

NATALI EID ESPARZA
Senior Transportation Planner
RELEVANT EXPERIENCE:
- Highway 111 Intersection Improvements and Traffic Signal Synchronization Project
- Signal Coordination Timing along Jefferson Street
Natali Eid Esparza has been a key participant in various projects that involved coordination with local cities, Caltrans, County, Transportation Authorities, residents, and private developers. These projects included the preparation of traffic impact studies/analyses, traffic signal coordination timing plans, traffic signal designs, speed surveys, intersection/street/highway improvements, conceptual pavement delineation plans, and Congestion Management Program compliance projects throughout Southern California. Ms. Esparza is experienced in using a variety of transportation planning and traffic engineering software, such as Synchro, TruTraffic, Highway Capacity Software, TRAFFIX, and Crossroads.

Page 196 of 378 ends

17.F

Page 1614 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 19 Cover Letter I II III A
KIM PREAP, P.E.

Senior Transportation Engineer
RELEVANT EXPERIENCE:
- Pomona Rincon Road at Soquel Canyon Parkway Plans
- Specifications & Estimates (PS&E) Project
- Sprouts Market
Kim Preap, P.E. will manage the design efforts for our LLG team. He is a licensed Traffic Engineer in the state of California and has over 20 years of experience working on traffic engineering projects throughout the Southern California region. He has extensive experience in the design of traffic signals, street lighting, signing and striping, traffic control plans, pedestrian accessibility upgrades, roadway operation system designs, CCTV, trunk line communication, and has succeeded in completing more than 90 traffic signal-related designs. In addition, he provides “on‐call” consulting services for the cities of Dana Point and Long Beach.

JEREMY MEMPIN
Transportation Engineer III
RELEVANT EXPERIENCE:
- Grand Terrace Active Transportation Plan
- City of Fullerton Local Roadways Safety Plan
Jeremy Mempin is an Engineer-in-Training in the state of California and will provide support related to the detailed technical analyses for all work tasks. He earned his Bachelor of Science in Civil Engineering from the University of California, Irvine and has over 7 years of experience working on traffic engineering projects throughout the Southern California region. Mr. Mempin has experience in the preparation of traffic impact analysis reports and parking studies, as well as experience in the design of traffic signals, street lighting, signing and striping and traffic control plans.

Page 197 of 378 ends

17.F

Page 1615 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 20 Cover Letter I II III A
ANGELA BESA, P.E.

Transportation Engineer III
RELEVANT EXPERIENCE:
- San Manuel Hotel and Casino Expansion
- San Manuel Casino Master Planning Traffic Support
- City of Laguna Niguel General Plan Update
Angela Besa, P.E. has been with LLG for 8 years and will provide support on detailed technical analyses for all work tasks. Ms. Besa is a registered Civil Engineer in the state of California. She is experienced in the preparation of traffic impact analysis reports for a variety of land uses, site access and operational plans and parking studies. She was responsible for the Traffic Impact Analysis Report for the San Manuel Hotel and Casino Expansion on the San Manuel Reservation in San Bernardino County. Ms. Besa worked closely with County and Tribal staff during the preparation of the Traffic Impact Analysis Report and throughout the approval process.

MEGAN LAM
Transportation Engineer III
RELEVANT EXPERIENCE:
- Meredith International Centre Specific Plan Amendment - Beckman Business Center
- Rancho La Habra
Megan Lam has been with LLG for 9 years and will provide support on detailed technical analyses for all work tasks. Ms. Lam is an Engineer-inTraining in the state of California. She is experienced in the preparation of traffic impact analysis reports for a variety of land uses, site access and operational plans and parking studies. She was responsible for the Traffic Impact Analysis Report for the Meredith International Centre Specific Plan Amendment in the City of Ontario. Her expertise in traffic engineering helps LLG continue its tradition of excellence in the region.

Page 198 of 378 ends

17.F

Page 1616 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 21 Cover Letter I II III A
GOLNAZ SARRAM. PH.D.

Transportation Engineer I
RELEVANT EXPERIENCE:
- City of Laguna Niguel General Plan
- Santa Clarita Laboratory Building Travel Time Study
Golnaz Sarram, Ph.D. earned her Doctor of Philosophy in Civil Engineering, with a specialization in Transportation Engineering, from the University of Memphis and has 2 years of experience working on transportation planning and modeling projects throughout the Southern California region and Tennessee State. Ms. Sarram has significant experience in long range planning and forecasting, travel demand modeling, Vehicle Miles Traveled (VMT) analyses, GIS mapping and analysis and data analysis by Microsoft Excel and by R and Python programming. She is proficient in utilizing TransCAD, ArcGIS Pro, AutoCAD, R, Python programming and GISDK.

YI LI
Transportation Engineer I
RELEVANT EXPERIENCE:
- City of Laguna Niguel General Plan Update
- KPC Coachella Specific Plan
Yi Li is an Engineer-in-Training in the state of California and will provide support related to the detailed technical analyses for all work tasks. She earned her Master of Science in Civil Engineering from the University of Southern California, Los Angeles and has 2 years of experience working on traffic engineering projects throughout the Southern California region. Ms. Li has experience in the preparation of VMT analysis reports and traffic studies, as well as experience in programming, implementation, execution and application of travel demand models.

Page 199 of 378 ends

17.F

Page 1617 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 22 Cover Letter I II III A

PROJECT MANAGEMENT STRATEGY
Our general approach focuses on communication,
insightful and accurate services, timely delivery of
work products, and early anticipation of issues. We
carefully reviewed the scope of work to be provided,
as detailed in the RFP. We understand that specific
tasks will demand sensitivity to issues, experience
with project management, and the resources to
provide timely and accurate deliverables. As a large
transportation planning and traffic engineering
firm, we have the staffing size that allows us to
always be available and responsive. As listed to the
right, we would implement the following key
approaches to ensure a successful and meaningful
project outcome. These key approaches are further
explained below:

1. Innovative High Impact Solutions
LLG will provide innovate and comprehensive consulting services to enable the City to serve as a model in the practice of innovative transportation planning and traffic engineering.

2. Effective Project Management
Effect project management involves the management of resources, knowledge, and people.

We will ensure the Project Team’s sound organization, in-depth understanding of the issues and goals, and development/execution of the project plan. Our staffing size allows us to handle multiple tasks simultaneously.

3. Adherence to the Procedures
LLG will adhere to the standards, policies, business methods, and project requirements. This includes understanding Federal, State, and Local regulations and best practices within our discipline.

4. Regular and Effective Client Communication
Zawwar Saiyed, as the Project Manager, would facilitate communication between the City, responsible parties, and the Project Team. LLG frequently uses teleconferencing and emails to expedite project manage. LLG will provide written updates on the project’s progress since communication is paramount.

5. Availability and Responsiveness to Client
Many of our projects demand that we be responsive and work effectively with other team members. All phone calls and emails are returned within 24 hours.

METHODOLOGY

1. Innovative High Impact Solution

2. Effective Project Management

3. Adherence to the Procedures

4. Regular & Effective Client Communication

5. Availability & Responsiveness to Client

6. Anticipation of Issues & Problem Solving

7. Graphics & Visual Simulations

8. Well-Documented Reports/Plans

9. Schedule & Budget Adherence

10.Quality Assurance/Quality Control

Page 200 of 378 ends

17.F

Page 1618 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 23 Cover Letter I II III A

6. Anticipation of Issues and Problem Solving
We understand that smooth progression is critical to achieving a successful outcome. We embrace a philosophy of anticipating issues or conflicts before they arise. In some instances, issues cannot be avoided but they will be addressed positively and affirmatively.

7. Graphics & Visual Simulations
It is critical to illustrate the issues,
analysis, and results. LLG will prepare
high-end informative figures, graphs,
maps and illustrations for use in the
reports and presentations.

8. Well-Documented Reports/Plans
LLG has prepared several thousand
technical reports and design plans.

We specialize in putting the study’s
technical elements of the report into
a format that our clients and the
public can easily understand.

9. Schedule and Budget Adherence
We recognize the importance of the project adhering to a set schedule and budget. We will prepare a schedule and a cost breakdown of the tasks at the beginning of the project for approval. The schedule will be met, and the budget will not be exceeded.

10.Quality Assurance/Quality Control
LLG has a standard practice of quality control that involves both Senior and Principal-level staff members.

Every deliverable to the City will be reviewed before leaving our office as part of our Standardized Quality Control Program.

Page 201 of 378 ends

17.F

Page 1619 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 24 Cover Letter I II III A

HEALTH, SOCIAL JUSTICE & EQUITY WORK
There is a direct relationship between health, equity, social justice and the built environment. Although many factors affect health and equity, research shows that there is a direct link between transportation and equity. LLG is committed to being a part of the solution working alongside the City to tackle the challenges with healthy living and dismantling the social injustices in transportation. Our mission is to provide insightful, accurate and innovative transportation planning and engineering solutions that emphasize the importance of safe, equitable and efficient mobility for the traveling public.

OUR COMPANY
LLG is committed to fostering a diverse workforce and maintaining an equitable, inclusive and safe workplace for all employees. Our staff comprises a wide range of backgrounds and characteristics, much like the communities we serve. As such, we bring a fresh and multi-faceted perspective to all our projects and all staff, no matter their position or level, are encouraged to provide their valued opinions and thoughts. A diverse team brings diverse perspectives, ensuring a broader evaluation of the problem at hand.

OUR PROFESSIONAL APPROACH
The first step towards social justice and equity in transportation is to identify existing disparities and inequalities and their roots to establish a clear understanding of the underlying and explicit issues. As transportation engineers, planners and professionals, we clearly understand the impacts and implications of our projects, work and decision-making.

OUR GUIDING STRATEGIES
LLG recognizes there is work to do to ensure social justice and equity in transportation. We look forward to being a part of the solution and applying these values and principles to projects:

1. Collaborate with Organizations, Stakeholders & Communities

2. Connect transportation messages to issues people care about

3. Use effective-messengers

4. Use demonstration projects as a communication tool

5. Make the transportation process easy to understand

6. Connect people to destinations

7. Set performance targets that will improve safety

8. Change culture to support multimodal transportation systems

9. Take time to make sure project scopes are correct

10. Remove barriers to participating in transportation decisions

11. Build partnerships and relationships across disciplines

Page 202 of 378 ends

17.F

Page 1620 of 2581 ends

SECTION III

FEE SCHEDULE

Page 203 of 378 ends

17.F

Page 1621 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 25 Cover Letter I II III A
III. FEE SCHEDULE
Effective January 1, 2024

TITLE PER HOUR
Principals
Principal Engineer..........................................................................................................$ 298.00 Associate Principal Engineer..........................................................................................$ 268.00 Planning/Design Manager .............................................................................................$ 249.00 Transportation Engineers
Senior Transportation Engineer.....................................................................................$ 226.00 Transportation Engineer III............................................................................................$ 200.00 Transportation Engineer II.............................................................................................$ 171.00 Transportation Engineer I..............................................................................................$ 147.00 Transportation Planners
Senior Transportation Planner.......................................................................................$ 200.00 Transportation Planner III..............................................................................................$ 171.00 Transportation Planner II...............................................................................................$ 146.00 Transportation Planner I................................................................................................$ 130.00 Signal System Specialist
Senior Signal System Specialist......................................................................................$ 226.00 Signal System Specialist III .............................................................................................$ 200.00 Signal System Specialist II ..............................................................................................$ 171.00 Signal System Specialist I ...............................................................................................$ 147.00 Technical Support
Engineering Associate III................................................................................................$ 150.00 Engineering Associate II.................................................................................................$ 145.00 Engineering Associate I..................................................................................................$ 140.00 Engineering Computer Analyst II ...................................................................................$ 138.00 Engineering Computer Analyst I ....................................................................................$ 109.00 Senior CADD Drafter......................................................................................................$ 140.00 CADD Drafter III .............................................................................................................$ 130.00 CADD Drafter II ..............................................................................................................$ 115.00 CADD Drafter I ...............................................................................................................$ 98.00 Senior Engineering Technician.......................................................................................$ 140.00 Engineering Technician II...............................................................................................$ 130.00 Engineering Technician I................................................................................................$ 99.00 Word Processor/Secretary.............................................................................................$ 92.00 Engineering Aide I..........................................................................................................$ 70.00 Public Hearing and litigation support may be charged at 125% of the base rate. Consultation in connection with litigation and Court appearances will be quoted separately.

Project-related mileage will be billed at the prevailing standard mileage rate as determined by the IRS.

Subcontractors and other project-related expenses will be billed at cost plus 15%.

The above schedule is for straight time. Overtime will be charged at 1.50 times the standard hourly rates.

Interim and/or monthly statements will be presented for completed work. These will be due and payable upon presentation unless prior arrangements are made. A finance charge of 1.5% may be charged each month on the unpaid balance.

Page 204 of 378 ends

17.F

Page 1622 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 26 Cover Letter I II III A
It is noted that Section 4.2 of the RFP has identified a General Scope of Work including rates for plan check and review services, thus based on our overall sense and understanding of the issues, we divided this section into two parts. The first part, On-Call Traffic Review Services, will be based on the fixed rates listed below:

1. Review of the Traffic Scoping Agreement, Traffic Impact Analyses (TIA), VMT Screening Memos, Queuing Memos, and other Traffic Related Studies Fees:
a. Traffic Scoping Agreement = $2,500
b. TIA for LOS
i. 1 to 25 Intersections = $3,000
ii. 26 to 50 Intersections = $4,250
iii. Over 51 Intersections = We will provide letter proposal. c. VMT Analysis for CEQA
i. VMT Screening Memo = $2,500
ii. Detailed VMT Analyses with Travel Demand Model Input Checks = $3,500 d. All Others
i. We will provide a letter proposal. The Scope of Work for different tasks and disciples is outlined in the next section. The City can request a $2,500 deposit. Once this deposit is exhausted, the City can then request additional funds based upon the letter proposal provided.

2. Review of Traffic Plans (80% of the fees the City will collect):
a. Traffic Signal (Three Plan Checks)
i. Initial Sheet = $2,120 ($2,650 will be collected by the City) ii. Each Additional Sheet = $1,060 ($1,325 will be collected by the City) iii. Any Plan Checks beyond three = We will provide letter proposal.

3. Warrant Analyses (Stop Signs, Traffic Signal, etc.):
a. We will provide letter proposal. The Scope of Work in the following section provides more detail on this task.

4. Task 4: Other Traffic Related Services:
a. We will provide letter proposal. The Scope of Work in the following section provides more detail on this task.

The second part, On-Call Traffic Engineering Services, will be based on the letter proposal provided per requested task order. This letter proposal will be based on the fee schedule above. Further, we propose the following detailed Scope of Work for individual tasks for the On-Call Traffic Engineering Services. Please note that the tasks

Page 205 of 378 ends

17.F

Page 1623 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 27 Cover Letter I II III A
listed below are not in the same order nor have the same title as in the RFP since we added additional tasks and subtasks beyond what is required in the RFP to provide more detail, sequentiality and clarity.

Page 206 of 378 ends

17.F

Page 1624 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 28 Cover Letter I II III A

SCOPE OF WORK
TASK 1 – PREPARATION OF TRAFFIC

IMPACT ANALYSIS REPORTS
The following is the general anticipated work
program, which focuses to the preparation of a
traffic impact analysis report (i.e. for Project Level
Transportation Analysis and/or Long Range Corridor
Studies [General Plans and Specific Plans]), which
includes specific work tasks for Trip Generation
Analysis, On-Site Circulation Analysis, Access Studies
and Data Collection.

1.1 – Contact City staff to discuss the
project and analysis criteria, confirm
the study approach, identify
pertinent traffic issues and concerns,
and formalize the Scope of Work for the traffic study.

In consultation with City staff, prepare a scope of
work agreement detailing the study area,
assumption, traffic analysis scenarios, list of related projects to be included in the near-term cumulative
assessment, need for long-term buildout analyses,
and overall traffic impact analysis report
requirements, and submit to City staff for review and
approval.

1.2 – Visit the project study area to confirm existing
conditions. Confirm the existing roadway striping,
traffic control measures, curbside parking
restrictions, adjacent intersection configurations,
and other pertinent roadway features within the
project study area. Identify the existing transit
system and bus stop locations within the project
study area.

1.3 – Conduct manual turning movement counts
during the morning (7:00 AM to 9:00 AM) and
afternoon (4:00 PM to 6:00 PM) peak periods at the
identified key study intersections within the project
vicinity. The traffic counts will also include
pedestrian and bicycle counts if necessary. If
required, the turning movement traffic counts with
be conducted with FHWA vehicle classifications.

1.4 – Conduct 24-hour daily machine traffic counts
at identified key roadway segments to support the
roadway segment capacity analyses. If required, the
24-hour daily traffic counts with be conducted with
FHWA vehicle classifications.

1.5 – Research data and recent traffic impact studies
prepared for developments in the Project vicinity
regarding the status of other proposed
developments (cumulative projects) in the area that
may contribute cumulative impacts to the adjacent
street system and study locations in the vicinity of
the proposed Project. The compiled list of
cumulative projects will be forwarded for review and
approval by City Staff.

1.6 – Determine and present in tabular and/or
graphic form a trip generation forecast for the
proposed Project on a daily and peak-hour basis. The
forecasts will be based on the trip generation rates
found in Trip Generation, 11th Edition, published by
the Institute of Transportation Engineers (ITE)
[2021]. Appropriate adjustments to the trip
generation potential of the Project to account for
internal capture and/or pass-by traffic will be made,
if applicable. In addition, if applicable, all truck trips will be converted into passenger car equivalents
(PCE) for capacity analysis.

1.7 – Prepare select zone model runs for the
proposed Project using the Riverside County Model
(RIVCOM) as provided by the Western Riverside
Council of Governments (WRCOG), if needed. This
will be done for the AM and/or PM peak periods to
determine the overall Project trip distribution
pattern. The distribution patterns will be submitted
for review and approval by City Staff prior to
finalization and will be used to formalize the study
area.

Page 207 of 378 ends

17.F

Page 1625 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 29 Cover Letter I II III A

1.8 – Assign the forecasted Daily, AM and PM peak
hour trips expected to be generated by the proposed
Project to the study intersections and roadway
segments based on existing and anticipated traffic
patterns to and from the Project site, as well as the
RIVCOM select zone model runs for the Project.

1.9 – Develop estimated trip generation projections
for each of the cumulative projects within the Project
vicinity. Distribute and assign cumulative project
traffic.

1.10 – Develop AM and PM peak hour and Daily
traffic volume projections at the key study
intersections and key roadway segments for existing
plus project traffic conditions, near-term traffic
conditions and long-term traffic conditions (if
required, long-term traffic projections will be
developed via the use of RIVCOM).

1.11 – Provide recommended mitigation measures
which may include intersection and/or signalization
improvements, striping modifications, the addition
of auxiliary turn lanes, traffic control/limitations at site access points, etc.

1.12 – Conduct traffic signal warrant
analyses for all impacted
unsignalized study intersections
and/or Project driveways utilizing the
peak hour warrants from the most
recent edition of the California Manual of Uniform
Traffic Control Devices (CA-MUTCD) where a traffic
signal is recommended as part of the mitigation
measure.

1.13 – Calculate the net traffic increment (fair-share
percentage) due to the Project at the impacted
intersections. Based on the required mitigation
measures, estimate the Project’s fair-share
percentage towards the cost of the proposed
mitigation improvements.

1.14 – Conduct freeway analyses for Existing, NearTerm, and Long-Term traffic conditions as outlined in the Caltrans’ requirements. These analyses will be
conducted to determine the potential impacts of the
proposed Project, if any.

1.15 – Review the proposed access and internal
circulation scheme of the proposed Project and
provide comments regarding the on-site
circulation/parking lot layout and design, ingress and
egress safety opportunities and constraints,
adequate sight distances at Project driveways,
locations of proposed driveways with respect to
existing (conflicting) driveways, striping
configurations, and median modifications, if any.

Evaluate and comment on pedestrian and bicycle
circulation.

1.16 – Prepare a traffic impact analysis report that
details all of the above-mentioned items including
our analysis, findings and conclusions. The report will be submitted for review by City staff. If necessary,
update the traffic impact analysis report based on
City staff comments and submit a final traffic impact
analysis report to the City.

TASK 2 – VEHICLE MILES TRAVELED
(VMT) ANALYSIS
The following is the anticipated work program, which
focuses on the preparation of a Vehicles Miles
Traveled (VMT) Analysis Technical Memorandum.

2.1 – Coordinate with City Staff to confirm the
assumptions that can affect the analysis and confirm
VMT requirements and thresholds as adopted by the
City. Use RIVCOM, convert proposed Project
development totals into Socioeconomic Data (SED),
and code the appropriate land uses and network
assumptions into the baseline and cumulative Traffic
Analysis Zone(s) (TAZs) for the project.

2.2 – Determine Project impact based on the City’s
adopted guidelines. Utilize up to three (3) efficiency

Page 208 of 378 ends

17.F

Page 1626 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 30 Cover Letter I II III A
metrics such as per capita, per employee, and/or per
service population as the regional average threshold.

2.3 – Prepare and conduct full model runs for the
applicable scenarios listed below via the use of
RIVCOM. The land uses in the TAZ or TAZs of which
the Project is contained will be changed to reflect the “with Project” conditions. The analysis scenarios
associated with the model update and runs are listed
below:
• Baseline Year Conditions
• Baseline Year With Project Conditions
• Buildout Year Conditions
• Buildout Year With Project Conditions

2.4 – Evaluate the “With Project” Scenarios noted
above for Baseline and Buildout conditions and
summarize the VMT as outlined in the City’s
guidelines.

2.5 - Calculate the Baseline and Buildout City and/or
regional average VMT thresholds and determine
Project and Buildout impacts based on the VMT
guidelines adopted by the City.

2.6 – Recommend appropriate mitigation
measures, if necessary, to reduce the impact. LLG
will consider the mitigation measures listed in the
Handbook for Analyzing Greenhouse Gas Emission
Reductions, Assessing Climate Vulnerabilities, and
Advancing Health and Equity (dated December
2021), prepared by the California Air Pollution
Control Officers Association (CAPCOA).

2.7 – Quantify the effects of the mitigation
improvement by utilizing the Handbook for
Analyzing Greenhouse Gas Emission Reductions,
Assessing Climate Vulnerabilities, and Advancing
Health and Equity.

2.8 – Prepare a VMT Analysis Technical
Memorandum detailing all the above-mentioned
items, our findings and conclusions. The technical
memorandum will be suitably documented with
appropriate text, tabular, graphic, and/or appendix
materials. The technical memorandum will be
submitted and reviewed by City staff. Comments will
be addressed in the final VMT Analysis Technical
Memorandum.

2.9 – Attend project coordination meetings with City
staff as necessary during the preparation of the VMT
Analysis Technical Memorandum.

2.10 – Additional services that LLG can also assist the City as follows:
• SB 743 Project Screening
• Transit Priority Area (TPA) Mapping
• VMT Mitigation Analysis (TDM and Fee
Programs)
• VMT Guidelines and Policy Support
• Climate Action Plan Support and Air Quality
VMT
TASK 3 – PREPARATION OF PARKING

DEMAND ANALYSIS REPORTS
The following is the anticipated work
program, which focuses to the
preparation of a parking study.

3.1 – Meet with City staff to identify pertinent
parking issues and concerns and formalize a Scope of
Work for the parking study.

3.2 – Conduct a visit to the site area and review
existing on-site conditions.

3.3 – Prepare a parking analysis for the proposed
Project. The contents of the parking analysis will be
based on the approved City Scope of Work and may
include the following analyses:
• City-code parking evaluation
• ULI Shared Parking evaluation
• Survey Shared Parking evaluation

Page 209 of 378 ends

17.F

Page 1627 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 31 Cover Letter I II III A
• Parking analysis based on other parking
resources (i.e., ITE Parking Generation 5th
Edition, etc.)

3.4 – Prepare a Parking Letter Report
that details all of the abovementioned items including our analysis, findings and conclusions. The
report will be submitted for review by the
appropriate members of City staff. If necessary,
update the Parking Letter Report based on City staff
comments and submit a Final Parking Letter Report
to the City.

3.5 – Attend project coordination meetings with City
staff as necessary during the preparation of the
Parking Analysis.

3.6 – Additional Studies will be prepared and may
include the following if required:
• Accumulation Surveys
• Utilization Surveys
• Neighborhood Parking Surveys
• Parking & Traffic Management Plans
• Parking Structure Review
• Parking Design/Layout
TASK 4 – PREPARATION OF TRAFFIC

DESIGN PLANS
The following work program is proposed for the
preparation of a “typical” PS&E (plans, specifications, and estimates) package, which consists of traffic
signal, signing and striping, and work zone traffic
control plans.

4.1 – Review existing and proposed improvement
plans for the proposed project. Confirm proposed
improvements accurately reflect the requirements
of the City. Meet with City staff to discuss any special requirements involved in the project’s design prior
to commencing development of the plans.

4.2 – Coordinate with the City for pertinent
street/signal design standards. The traffic signal and
signing/striping design will be prepared according to
City requirements and will be consistent with the
State of California Department of Transportation
Standard Plans and Specifications and the current
California Manual on Uniform Traffic Control Devices
(MUTCD).

4.3 – Visit the project site to photograph, measure,
and verify all pertinent existing surface conditions.

Make extensive field notes for traffic signal and
channelization plan preparation, consisting of street
geometrics, lane configurations and widths, landscape
and hardscape locations, inventory and location of
existing signs, traffic signal equipment, traffic signal wiring and electrical equipment, signal and lighting
pole locations, etc. The field review shall be completed as often as necessary throughout the duration of plan
preparation to ensure that conflicts do not arise during construction. LLG will research City records and collect existing plans and data necessary to complete the
plans. LLG will incorporate all field and existing
conditions data obtained through researching City
record files for the preparation of a completed design
plan set for review by various City departments and
other external Utility Companies. LLG will provide
electronic files for design plans (PDF format) and any
necessary hardcopy plan set for distribution when
requested.

4.4 – Obtain an aerial survey of the project area and
prepare a related topographic survey depending on the
availability of adequate base mapping and the nature
of the improvements, Research existing utilities
information at the City and utility companies to
coordinate proposed improvements with existing field
conditions. LLG will be responsible for the identification and distribution of plans to Utility Companies external to the City for review. LLG will deliver responses
collected by and retained in the design file to the City at time of plan approval. All comments received from
City departments and Utility Companies during the plan

Page 210 of 378 ends

17.F

Page 1628 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 32 Cover Letter I II III A
review process will be discussed with the City’s Project Manager and incorporated into the plan set.

4.5 – LLG will be responsible for preparing any
permit applications for outside agencies (Caltrans,
County, railroad, etc.) that may be necessary during the course of the project. LLG understands that
administration of the permit through the permitting
agencies process may also be required on the City’s
request.

4.6 – LLG will be responsible for the preparation of
right-of-way/easement documents for processing by
the City. This will include any services (i.e. survey)
necessary to complete the task.

4.7 – Traffic Signal Plan: Prepare traffic
signal installation or modification plans for
the project intersections. The plans will be
prepared at 1”= 20’ (20 scale) using
AutoCAD or MicroStation drafting software on 24” x
36” plan sheets. The plans will incorporate all aspects of the traffic signal including new and relocated signal standards, all signal heads, loop detectors, conduits,
the controller assembly, and service point locations.

We will show all related street/intersection
improvements on our plans to be prepared by the Civil
Engineer. The plans will conform to the City’s Standard Plans, Special Provisions, and any staff special
requirements, as well as the latest Caltrans Standard
Plans and Specifications. The traffic signal plans will be prepared under the supervision of and signed by a
Registered Civil Engineer. Traffic plans will include
existing overhead circuit elevations, conduit fill
capacity and electrical load requirements. LLG will
provide City staff with the design support information
and/or calculations for consideration during the City’s review of the plans.

4.8 – Signing and Striping Plans: Prepare signing and
striping plans for the project street segments. Our plans will be prepared at 1” = 40’ (40 scale) using AutoCAD or Microstation drafting software on 24” x 36” plan
sheets. Our plans will include all new striping,
pavement markings, pavement legends, and stripe
removals. At the project limits, we will reference in
existing striping based on topographic information and
field review. For those projects that require the
preparation of roadway design plans, the plans
prepared by the project civil engineer will be used as a base. For those projects that do not have significant
roadway work, LLG will prepare the base for our signing and striping plans using applicable as-built plans and
field review surveys. Note that if the signing and
striping work is fairly minor, signing and striping
improvements could be shown on the signal plan itself
to save the City time and money.

4.9 – Traffic Control Plans: If required, prepare work
zone traffic control plans and detour plans for the
implementation of the proposed street/intersection
improvements. Our plans will be prepared at 1” = 40’
(40 scale) using AutoCAD or Microstation drafting
software on 24” x 36” plan sheets. Our plans will
incorporate all aspects of traffic control devices, using the Work Area Traffic Control Handbook (WATCH) and
California MUTCD as reference.

4.10 – Signal Timing Plans: Prepare the appropriate
traffic signal timing plans that identifies the proposed signal cycle length, minimum green times, green
intervals, offsets and time of day operation. Submit the traffic signal timing plans to the City for review and
make any necessary revisions to the timing plans based
on City comments. Produce a signed copy of the signal
timing plans and submit to the City for approval.

Provide field support for data collection,
implementations, and trouble shooting.

4.11 – Special Provisions/Technical Specifications:

Prepare Special Provisions/Technical Specifications for any special construction instructions on the traffic
signal design projects. The technical special provisions will be prepared according to City’s requirements. An
electronic Word Document will be submitted to the
City as part of the first submittal of the plan set.

Updates to the specification and special provision will

Page 211 of 378 ends

17.F

Page 1629 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 33 Cover Letter I II III A
be submitted with subsequent plan submittals, if
required.

4.12 – Plan Submittal: Submit copies of the completed
plan set to the City for initial review and comment.

Copies to other agencies will be provided for their
review, as necessary. The plan set package will be
complete with all required sheets, including a title
sheet, roadway plans, signing and striping plans, traffic control plans, and traffic signal plans.

4.13 – Plan Processing and Revisions: Revise design
plans, Special Provisions, and cost estimates per City
comments and submit second and third plan sets for
final check and approval. After plans are approved, we
will submit one set of mylar plans for signatures. All
final plans and reports will be signed and stamped by a licensed professional engineer. Design plans will be
submitted to the City at 60%, 90% and 100% levels.

Final drawings will be wet signed and stamped on 24” x
36” mylar.

4.14 – Review Standard Details: Review and
comment on traffic related standard drawings that the
City is developing to assure compliance with California MUTCD and Caltrans requirements.

4.15 – Meeting Support: Attend coordination
meetings with City staff, the project Civil Engineer,
and/or other public agencies to ensure projects are
processed within the established deadlines.

TASK 5 – PEER REVIEW OF TRAFFICRELATED TECHNICAL REPORTS

5.1 – Meet with City Staff to identify
pertinent traffic issues and concerns.

Assist City staff in the preparation of
a Scope of Work and/or review
applicant’s traffic engineer’s work program for the
traffic analysis report and/or parking demand
analysis report. Review the site area, existing traffic circulation, and access characteristics to familiarize
ourselves with the project site and local area.

5.2 – Evaluate and review the traffic impact
analysis report for the proposed project prepared by
applicant’s traffic engineer. The report and its
accompanying appendices will be reviewed to
ensure consistency and compliance with City
requirements and guidelines, the current Congestion
Management Program (CMP), and standard
engineering practices. Our evaluation will focus on,
but is not limited to, the following:
• Traffic forecasting methodology and accuracy
of traffic forecasts
• Traffic analysis methodology and assumptions
• Intersection capacity analysis and project
impacts
• Recommended mitigation measures and their
feasibility
• Confirmation of findings and conclusions

5.3 - Review and evaluate the site access and
circulation-related characteristics of the proposed
project. Elements of this evaluation include:
• On-site circulation sizing (i.e., basic internal
network, drive aisle widths, orientation, and
throat dimensioning) and review of driveway
locations and dimensions on bordering
arterials
• Traffic control and limitations at site access
points and key internal locations, including
spacing, sight line characteristics, left-turn
provisions, right-turn in/out restrictions,
auxiliary lane needs, median configurations
and control measures
• If applicable, service/delivery configuration
and on-site truck circulation
• If applicable, orientation of parking facilities to
internal vehicle and pedestrian system and
external street system.

5.4 - Evaluate and review the parking demand
analysis report for the proposed project prepared by

Page 212 of 378 ends

17.F

Page 1630 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 34 Cover Letter I II III A
applicant’s traffic engineer. The report and its
accompanying appendices will be reviewed to
ensure consistency/compliance with City parking
requirements and ULI’s Shared Parking methodology
(if applicable). Our evaluation will focus on, but not
limited to, the following:
• Parking forecasting methodology and accuracy
of parking forecasts
• Parking methodology and assumptions
• Parking demand/supply analysis
• Confirmation of findings and conclusions

5.5 - Evaluate and review the Vehicles Miles
Traveled (VMT) analysis report for the proposed
project prepared by applicant’s traffic engineer. The
report and its accompanying appendices will be
reviewed to ensure consistency and compliance with
City requirements and guidelines and standard
engineering practices. Our evaluation will focus on,
but not limited to, the following:
• VMT forecasting methodology and accuracy of
traffic forecasts
• Travel Demand Model Inputs and Land Use to
SED Conversion
• VMT and Travel Demand Model assumptions,
including the development of the Project VMT
and the Regional VMT (City VMT). The model
input and output model files will be required
to complete this review task
• Senate Bill 743 (SB 743) Compliance
• Recommended mitigation measures (i.e., TDM
measures) and their level of effectiveness per
the CAPCOA document
• Quantification of the recommended mitigation
measures and TDM Strategies
• Confirmation of the reasonableness of analysis
Findings and Conclusions

5.6 - Products prepared as part of this Scope of Work
include the preparation of a memorandum, which
will summarize our review and comments and/or
report mark-ups. The memorandum will set forth the
results of our evaluation and review of the traffic
impact analysis, parking demand analysis, and/or
VMT analysis for the proposed development with
specific comments relative to recommended
remedial action of any identified shortcomings
relative to methodology, accuracy, and adequacy.

TASK 6 – PEER REVIEW OF TRAFFICRELATED DESIGN PLANS
The following is the anticipated work program, which
focuses on a peer review of traffic-related design plans.

6.1 – Meet with City Staff to identify pertinent traffic issues, concerns, and any special requirements
involved in the project’s design. Visit the site area
and review existing conditions on the project area
streets (i.e., limits of the design work).

6.2 – Evaluate and review the design plans (i.e.,
traffic signal plans, signing and striping plans, traffic control plans, signal timing plans, etc.) prepared by
the applicant’s traffic engineer. The design plans will be reviewed to ensure consistency with City
requirements and consistency with the State of
California Department of Transportation Standard
Plans and Specifications and the current California
Manual on Uniform Traffic Control Devices (MUTCD).

6.3 - Products prepared as part of this Scope of Work
include the preparation of plan mark-ups and/or a
memorandum summarizing our review comments.

TASK 7 – INTELLIGENT

TRANSPORTATION SYSTEMS (ITS)
LLG staff has been providing Intelligent Transportation Services (ITS) for various agencies for over two decades and below is a list of anticipated tasks:

Page 213 of 378 ends

17.F

Page 1631 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 35 Cover Letter I II III A

7.1 – Provide the City with traffic signal
synchronization traffic controller technology and
communication systems with International
Municipal Signal Association (IMSA) Transportation
Center System Specialist Level I, IMSA Traffic Signal
Senior Field Technician Level III certifications.

7.2 – Provide traffic engineering design plans for
various infrastructure projects including new and
modified traffic signals, wired and wireless
communications, street lighting, signing and striping,
and construction detours.

7.3 - Provide the City with support for the
complexities and implications of various traffic
signals, communications, and ITS upgrades.

7.4 – Provide support to the City for Traffic Signal
Systems projects that include installing and
upgrading ITS elements such as signal control
systems at the respective Traffic Management
Centers, signal design and signal timing preparation
and implementation, signal controller and assembly
upgrades, and operating, maintaining, and
supporting/monitoring the traffic signal systems.

7.5 – Implement, fine-tune, operate, monitor, and
troubleshoot various signal systems and ITS
applications on a continual basis.

7.6 - Additional ITS service that LLG can also assist
the City as follows:
• Traffic Signal Synchronization,
implementation, fine-tuning and monitoring
for individual Cities or multijurisdictional
between Cities, County and Caltrans
• Network and communication development
and support
• System Integration with agency central
systems, design, signal timing support and
implementation
• Inventory of ITS Components and Subsystems
• Infrastructure Monitoring and Operational
Maintenance
• Traffic Signal Hardware and Software
installation, operations, and maintenance
• Implementation and Technical Oversight for
Adaptive Signals
• Implementation of Traffic Management Center
(TMC)
• Troubleshooting Traffic Related Equipment
(Network, Controllers, and Timing)
TASK 8 – SPEED DATA ANALYSIS

8.1 – Conduct engineering studies as defined in the
California Vehicle Code (CVC) for the review of all
speed zones adopted by ordinance, analyze speed
data and recommend speed limit changes and safety
related improvements.

TASK 9 – INTERSECTION CONTROL

STUDIES & WARRANT ANALYSES
The following is a list of intersection control studies that LLG can provide to the City as needed.

9.1 – Multi-Way Stop: Conduct an engineering study
for the consideration of a Multi-Way Stop installation
that utilizes methodology described in Section 2B.07
of the latest Edition of the California Manual on
Uniform Traffic Control Devices (MUTCD) or
conforms to City Policies and Procedures for
Residential Multi-Way Stop Signs. Traffic counts will
be conducted for all approaches to the intersection
and will be performed for a 24-hour period during a
typical workday (unless specified otherwise).

9.2 – Traffic Signal: Conduct traffic signal warrant
analysis for the consideration of a traffic signal
installation. The engineering study would utilize the
methodology described in Chapter 4C of the latest
Edition of the California MUTCD. Unless specified
otherwise, it should be assumed warrants 1 through

Page 214 of 378 ends

17.F

Page 1632 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 36 Cover Letter I II III A
8 will be analyzed for each location requested.

Machine traffic counts will be performed for all
approaches to the intersection and will be
performed for a 24-hour period during a typical
workday (unless specified otherwise).

9.3 – Determine the most appropriate intersection
control at a requested intersection for the control
measures listed above. All alternatives shall be
compared on the basis of safety, user delay and
implementation cost. The results of the study
including recommendations shall be summarized in
memorandum format and submitted to the City for
review.

TASK 10 – PEDESTRIAN & BICYCLE

MOBILITY / ACTIVE TRANSPORTATION
PLANS
The following is the anticipated work program, which
focuses on the preparation of an Active Transportation
Plan (ATP) with emphasis to Pedestrian and Bicycle
Mobility.

10.1 – Coordinate with City Staff to
discuss the Project, develop short,
medium and long-range goals,
objectives, and performance measures
in accordance with the local, state and federal
policies and guidelines, evaluate existing
transportation systems within the City and identify
pertinent active transportation conditions for the
Active Transportation Plan (ATP).

10.2 – Work collaboratively with the City to develop
a comprehensive Public Participation Plan (PPP) and
engagement components. Work with City to collect
community feedback regarding needs, issues, and
challenges for both existing and potential active
transportation travel by holding Community
Workshop series, distributing public input surveys,
etc.

10.3 – Inventory and assess existing on-off road
active transportation facilities, such as sidewalks,
bikeways, multi-use paths, and other enhancements
supporting active transportation, bike racks and
bicycle lockers. Develop a comprehensive baseline
map using Geographic Information Systems (GIS)
software and a summary report that includes a
geographic and demographic review of the City.

10.4 – Identify needs on the City’s active
transportation network based on prior tasks analysis
and public inputs. The needs assessment will
consider future growth, safety with respect to
bicyclists and pedestrians, existing gaps in and
deficiencies of active transportation, mobility and
accessibility across all ages and abilities, and public and stakeholder feedback recorded during the
outreach process.

10.5 – Identify strategies and compile a prioritized
list of infrastructure improvements, including noninfrastructure solutions and programs consistent with the goals and objectives of the plan. In
coordination with the City, develop strategies to
address needs and develop a methodology for
prioritizing investments and strategies.

10.6 - Provide a planning-level cost estimate for
recommended strategies and infrastructure
improvements. Identify available funding sources for
active transportation projects, including Federal and
State grants, private capital, and local funds by
project or strategy.

10.7 – Develop an ATP based on the results and
feedback. The ATP will be suitably documented with
appropriate text, tabular, graphic, and/or appendix
materials. The ATP will be submitted and reviewed
by City staff. All applicable comments will be
addressed in the final ATP.

Page 215 of 378 ends

17.F

Page 1633 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 37 Cover Letter I II III A

10.8 – Attend project coordination meetings with
City staff as necessary during the preparation of the
ATP.

TASK 11 – TRANSPORTATION SAFETY

STUDIES AND ACTION PLANS
The following is the anticipated work program, which
focuses on the preparation of a Safety Plan/Report (i.e., Local Road Safety Plan (LRSP), Vision Zero Action Plan, SS4A Action Plan, etc.).

11.1 – Coordinate with City Staff to
discuss the Project, evaluate existing
transportation systems within the
City and identify pertinent traffic
safety issues for the Safety Plan/Report. The Safety
Plan/Report will provide a framework to identify
potential safety enhancements to reduce trafficrelated accidents on the City transportation network.

11.2 – Evaluate safety data based on coordination
with City staff to determine the data source and the
time period of data to be utilized. The data includes
collisions, traffic volumes, number of lanes, and
posted speeds. Work with City staff to formalize the
safety plan approach, goals, and objectives to serve
multimodal mobility needs safely and equitably.

11.3 – Analyze the collision data for the City’s
publicly maintained roadway network to identify
high collision locations. Identify high-injury corridors and intersections (those with the highest number of
fatalities and severe injury collisions). Process the
collision data and translate it into tabular or
graphical formats.

11.4 – Develop a comprehensive Stakeholder
Engagement Plan and engagement components.

Work with City to hold Community Workshops to get
feedback on traffic safety concerns from the public.

11.5 – Identify and document deficiencies within the
existing transportation network based on safety
concerns regarding traffic data and collision data
analysis as well as feedback received from the public
in the Community Workshops and the stakeholders.

11.6 - Determine emphasis areas with
considerations to the 4 “Es” (Education,
Enforcement, Engineering, and Emergency Medical
Services) based on the collision analysis.

11.7 – Identify strategies to address these emphasis
areas based on the emphasis areas conditions and
the goals, and achieve the project goals,
recommendations, and countermeasures to reduce
the likelihood of future crashes.

11.8 – Prepare the Safety Plan/Report that details
all of the items mentioned above, our findings,
assessment, and conclusions. The report will be
suitably documented with tabular, graphic, and
appendix materials. The report will be submitted to
the City and revised to address any City comments.

The proposed plan will include a methodology to
regularly review and update the Safety Plan/Report
plan once it has been approved and adopted by the
City.

TASK 12 – TRANSPORTATION DEMAND

MANAGEMENT (TDM) PLANS
The following is the anticipated work program, which
focuses to the preparation of a Transportation Demand
Management (TDM) Plan.

12.1 – Coordinate with City Staff to address
congestion, mobility, access, and environmental
issues related to transportation, traffic, and parking
at work sites, residential communities, mixed use
activity centers, and travel corridors.

12.2 – Provide comprehensive mobility and TDM
strategies applied with the following:

Page 216 of 378 ends

17.F

Page 1634 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 38 Cover Letter I II III A
• Conducting market and transportation
research
• Assessing and developing public policies
• Creating transportation management plans
• Designing parking management programs
• Developing transportation projects
• Designing, implementing, and managing
transportation programs
• Training and education to develop client
capabilities
• Creating partnerships to mobilize communities
and deliver effective programs
• Evaluating investments in transportation
programs and projects
TASK 13 – TRAVEL DEMAND MODELING
The following is the anticipated work program, which
focuses on the preparation of a city-wide regional
Transportation Analysis Model.

13.1 – Coordinate with City Staff to discuss the
project and identify pertinent traffic issues and
concerns to develop a citywide traffic forecast model
for the General Plan Updates. Additionally, the
citywide traffic forecast model will also establish the framework for Vehicle Miles Traveled (VMT) analysis
and allow future development within the City to be
fully compliant with Senate Bill (SB) 743.

13.2 – Develop the City of Hemet Transportation
Analysis Model that will tier-off RIVCOM and will
allow for micro-level detail, validation, and
refinement within each Traffic Analysis Zone (TAZ)
within the City’s jurisdiction. It should be noted that the City currently relies on the RIVCOM, prepared by
WRCOG, for its modeling needs.

13.3 – Verify in the field the existing roadway
network for the base year model. All planned
buildout network improvements will be confirmed
for inclusion within the future year scenario.

13.4 – Coordinate with the City and confirm all
Existing and Buildout model inputs.

13.5 – Review every TAZ within the City with
microscopic detail and the most recent adopted
socioeconomic data and land uses will be inputted
and validated, in addition to the network
assumptions. Socioeconomic data will be consistent
with the City’s General Plan for the base model and
General Plan for the updated base model,
respectively. The socioeconomic data will be
reviewed by the City and will include the number of
households, population demographics,
employment, etc., within each TAZ.

13.6 – Calibrate the Hemet Transportation Analysis
Model to allow for more precise, detailed integration
of City land uses to improve long-term induced travel
modeling capabilities.

13.7 – Conduct sensitivity modeling for the above
analysis scenarios. Land use data will be organized by
existing TAZs.

13.8 – Evaluate the scenarios noted above for the
Baseline and Cumulative conditions, and summarize
the following types of VMT:
• Project generated VMT per Capita (VMT/Cap),
VMT per Employee (VMT/Emp) and/or VMT
per Service Population (VMT/SP) and
compared it to the appropriate benchmark
noted in the City’s Guidelines.
• Project effect on VMT: comparing how the
Project changes VMT on the network by
looking at Citywide VMT.

13.9 – Calculate the Baseline and Buildout City
average VMT per Capita (VMT/Cap), VMT per
Employee (VMT/Emp), VMT per Service Population
(VMT/SP) and/or Citywide VMT.

Page 217 of 378 ends

17.F

Page 1635 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 39 Cover Letter I II III A

13.10 – Additional services that LLG can also assist
the City as follows:
• Travel behavior survey and evaluation, data
visualization
• Future traffic volumes forecasts
• Select zone and link analysis
• Average trip length (ATL) analyses
• Transit and highway corridor assessments
• Location-based analytics
• Assessment of transit and shared mobility
systems
• Connected/Autonomous Vehicles planning
and modeling analyses
• Network development assignments
TASK 14 – BIG DATA ANALYTICS
Travel behavior is difficult to predict
and traditional approaches rely on
many assumptions. “Big Data” utilizes
travel behavior data from GPS data
sources such as smart phones and car
navigation systems to reveal how actual commuters are
using the transportation system. This private and datarich source allows LLG to provide more context to enhance our transportation planning services such as
below.

14.1 – Apply big data analytics for the following
based on individual project needs:
• Origin/Destination Studies
• Select Link Analysis
• Travel Time/Speed Studies
• Trip Length Studies
• Performance Measurements
• Multi-Modal TDM Opportunities Review
• Internal/External Studies
• Commercial Trips
• Segment Congestion
• Parking Studies
TASK 15 – GEOGRAPHIC INFORMATION

SYSTEMS (GIS)
The following is a list of applicational uses of
Geographic Information Systems (GIS) that LLG can
provide to the City as needed.

15.1 – Utilize state of the art software to create
Geographic Information Systems (GIS) that capture,
analyze and display spatial data – including natural
elements such as elevation and waterways, as well
as transportation links and land use information.

Data are graphically represented in either vector or
raster formats. Create GIS databases using a
common index variable that allows for interaction
with external systems. All information stored within
a GIS can be queried, analyzed, and displayed.

15.2 – Integrate existing geographical data into GIS,
to create customized maps and reports based on
specific project studies or action plans.

TASK 16 – GRANT WRITING SERVICES

16.1 – Notify the City with all applicable Grant
funding opportunities from all sources.

16.2 – Provide the City with technical and grant
writing support in applying for regional, state, and
federal grant opportunities. Prepare competitive
grant applications for both Planning Action Plans and
Implementation Projects.

16.3 – Provide the City with grant components
including application narrative, project justification, grant specific objectives, project scope of work, and
project timeline.

Page 218 of 378 ends

17.F

Page 1636 of 2581 ends

Proposal for the On-Call Traffic Engineering Services
City of Hemet | Linscott, Law & Greenspan, Engineers 40 Cover Letter I II III A
TASK 17 – MISCELLANEOUS TRAFFIC

ENGINEERING TASKS & SERVICES

17.1 – LLG is also well qualified to provide the
following consulting support services for the City:
• Preparation of Plans, Specifications and
estimates for Capital Improvement Program
(CIP) projects.
• Multi-Modal and Complete Streets traffic
engineering support and policies
• Prepare or review conditions of approval
• School related circulation
• Safe Routes to School
• Respond to traffic-related resident’s requests
• Traffic Simulation utilizing Synchro and/or
Vistro software
• Transit Studies and Corridor Studies
• Traffic Studies for Capital Projects
• Traffic Calming Support, including design and
review
• Road Review/Audits
• Advisory Curve Speed Assessments
• Research and outreach; assist staff in
producing reports and making presentations
on transportation related topics (i.e., attend
Neighborhood meetings, Traffic Commission
meetings, Planning Commission meetings
and/or City Council meetings)
• Training: provide and facilitate training of staff
in specific transportation planning areas as
requested by the City
• Upon request, conduct investigations and
prepare reports regarding requests for traffic
control device installations and modifications,
such as traffic signals, stop signs, parking
regulations, speed zones, channelization,
crosswalks, pedestrian, and bicycle facilities
• Upon request, advise, support and assist City
departments, committees, commissions and
the City Council. In addition, provide an
interface with Regional and State
transportation agencies. Assist in the
preparation of traffic-related portions of the
City’s operational and capital improvement
budgets
• Upon request, assist in the modification of the
Traffic Ordinance, development fees and
assessment fees for capital traffic
improvements and maintenance
• Upon request, assist City’s Director of Public
Works and Engineering Services in the
selection of other consultants to perform the
design of traffic safety projects
• Provide oversight of design and other
consultant contracts for traffic safety projects
• Provide contract administrations, construction
management and construction observation for
all City traffic safety projects
• Upon request, assist in the modification of the
City’s Guidelines and Code
• Upon request, prepare warrant studies per
latest California MUTCD
• Upon request, provide traffic counts through
appropriate subconsultants

Page 219 of 378 ends

17.F

Page 1637 of 2581 ends

APPENDIX A

RESUMES

Page 220 of 378 ends

17.F

Page 1638 of 2581 ends

Keil Maberry, P.E. PRINCIPAL

LINSCOTT, LAW & GREENSPAN, ENGINEERS
2 Executive Circle, Suite 250, Irvine, CA 92614
949.825.6175
www.llgengineers.com
LOCATIONS :

PASADENA
IRVINE

SAN DIEGO

BIOGRAPHY
Keil D. Maberry has over 37 years of experience in the preparation of transportation planning analysis, traffic impact studies and parking studies. He is a licensed Traffic Engineer in the state of California. Mr. Maberry holds a Bachelor of Science in Civil Engineering from the University of Maryland. He has extensive experience in the preparation of traffic impact studies for a variety of land uses, site access and operational plans, simulation studies, parking studies, traffic and parking management plans, school operational plans and suggested route to school plans. In addition, Mr. Maberry has provided on-call traffic and transportation engineering consultation services to the City of Anaheim (currently), City of Corona, City of Irvine and the City of Dana Point.

AREAS OF EXPERTISE
- Traffic Analysis Reports/Traffic Studies - General Plans and Specific Plans - Regional & Multimodal Transportation Plans - Expert Witness Testimony - VMT Analyses - Transportation Demand Management (TDM) - Mixed-Use Shared Parking Demand Studies - Trip Generation Studies - Traffic and Parking Field Studies - Sight Distance Analyses - Site Access and Internal Circulation - Traffic Signal Warrant Analyses - Roundabout Analysis and Design - Conceptual Improvement Plan Preparation - Traffic Signal Design - Traffic Control
- Signing and Striping Plans - Suggested Route to School Plans - Traffic Engineering, Transportation Planning and
Site Design Consultation

REPRESENTATIVE PROJECTS
 City of Laguna Niguel – City Center Traffic Impact Analysis Report and VMT Analysis  City of Chino Hills – Local Roadway Safety Plan (LRSP)  City of Coachella – KPC Coachella Specific Plan Traffic Impact Analysis Report and VMT Analyses  City of Anaheim – Anaheim Regional Transportation Intermodal Center (ARTIC) Traffic & Circulation Study  City of Murrieta – Kaiser Murrieta Valley Medical Center – Traffic Study and Caltrans Facilities Analyses  City of Corning – Rolling Hills Casino Amphitheater Traffic Management Plan & Freeway Queuing Analyses  City of Anaheim – Kaiser Permanente Orange County Medical Center Traffic and Parking Demand Analyses  City of Newport Beach – Lido Marina Village Redevelopment Parking Demand Analysis & Management Plan  City of Corona – Dos Lagos Master Plan EIR Traffic Impact Analysis Report YEARS OF EXPERIENCE – 37 years
YEARS WITH LLG ENGINEERS – 27 years
EDUCATION – B.S. in Civil Engineering, University of Maryland REGISTRATION – Professional Engineer, CA Registration TR 1802 PROFESSIONAL MEMBERSHIPS – Institute of Transportation Engineers (ITE) American Society of Civil Engineers (ASCE)
Urban Land Institute (ULI)

Page 221 of 378 ends

17.F

Page 1639 of 2581 ends

Zawwar Saiyed, M.S., P.E., R.S.P. ASSOCIATE PRINCIPAL

LINSCOTT, LAW & GREENSPAN, ENGINEERS
2 Executive Circle, Suite 250, Irvine, CA 92614
949.825.6175
www.llgengineers.com
LOCATIONS :

PASADENA
IRVINE

SAN DIEGO

BIOGRAPHY
Zawwar Saiyed is a licensed Traffic Engineer in the State of California and a certified Road Safety Professional (RSP) with the Transportation Professional Certification Board, Inc. He earned his Master of Science in Civil Engineering, with a specialization in Traffic Engineering and Transportation Planning, from the University of Arizona, Tucson and has over 23 years of experience working on traffic engineering and transportation engineering projects throughout California and abroad. Mr. Saiyed has extensive experience in travel demand modeling, Vehicle Miles Traveled (VMT) analyses and Travel Demand Management (TDM) mitigation measures, preparation of Traffic Impact Analysis (TIA) reports for a variety of land uses, site access and operational plans, parking studies and parking management plans.

Mr. Saiyed is proficient in utilizing TransCAD, ArcGIS Pro, AutoCAD, Highway Capacity Software, Vistro, Synchro and the MS Office Suite. Mr. Saiyed provides oversight and oversees the travel demand modeling and transportation planning teams. In addition, he currently provides on-call traffic engineering and transportation planning consultation services to the City of Anaheim, the City of Dana Point, City of Chino Hills and the City of Long Beach.

His expertise in traffic engineering and transportation planning helps LLG continue its tradition of excellence in the region.

AREAS OF EXPERTISE
- Traffic Analysis Reports/Traffic Studies - General Plans and Specific Plans - Travel Demand Forecasting / Modeling and
Simulation
- Traffic Engineering, Transportation Planning
and Site Design Consultation
- Regional & Multimodal Transportation Plans - Transportation Demand Management (TDM) - VMT Analyses - Technical Grant Writing Support
- Active Transportation Plans (ATP) - Pedestrian / Bicycle Planning - Complete Streets Analyses / Mobility Studies - Long Range Transportation Plans (LRTP) - Mixed-Use Shared Parking Demand Studies - Safety Action Plans - Traffic and Parking Field Studies - Trip Generation Studies - Site Access and Internal Circulation - Sight Distance Analyses - Roundabout Analysis and Design - Traffic Signal Warrant Analyses - Big Data Analytics - Geographic Information Systems (GIS)

REPRESENTATIVE PROJECTS
 City of Laguna Niguel – General Plan Update Study using Orange County Transportation Analysis Model  City of Coachella – KPC Coachella Specific Plan Traffic Impact Analysis Report and VMT Analyses  City of Anaheim – Anaheim Regional Transportation Intermodal Center (ARTIC) Traffic & Circulation Study  City of La Habra – Sempra Oil Field Development Truck Access Assessment and Evaluation Study  City of Murrieta – Kaiser Murrieta Valley Medical Center – Traffic Study and Caltrans Facilities Analyses  City of Corning – Rolling Hills Casino Amphitheater Traffic Management Plan & Freeway Queuing Analyses YEARS OF EXPERIENCE – 23 years
YEARS WITH LLG ENGINEERS – 18 years
EDUCATION – M.S. in Civil Engineering, University of Arizona REGISTRATION – Professional Engineer, CA Registration TR 2525 PROFESSIONAL MEMBERSHIPS – Institute of Transportation Engineers (ITE) American Society of Civil Engineers (ASCE)

Page 222 of 378 ends

17.F

Page 1640 of 2581 ends

Trissa de Jesus Allen, P.E., R.S.P. SENIOR TRANSPORTATION ENGINEER

LINSCOTT, LAW & GREENSPAN, ENGINEERS
2 Executive Circle, Suite 250, Irvine, CA 92614
949.825.6175
www.llgengineers.com
LOCATIONS :

PASADENA
IRVINE

SAN DIEGO

BIOGRAPHY
Ms. Trissa Allen has over 30 years of experience in the in the preparation of traffic and parking studies for a variety of land uses, multimodal plans (Complete Streets), Local Roadway Safety Plans (LRSPs), Active Transportation Plans (ATPs), site access and traffic operational plans, and parking management plans. She is a licensed Traffic Engineer in the State of California and certified Road Safety Professional. She was the Project Manager for the preparation of LRSPs for the City of Fullerton and City of Chino Hills. She prepared multimodal funding applications, safety studies, cost estimates, and benefit-cost ratios for HSIP and Metro Call for Projects for the City of Long Beach, and is currently working with the City of Fullerton on Safe Streets and Roads for All (SS4A) Grant Program applications. She worked with the City of Grand Terrace in developing the City’s Active Transportation Plan, and with the City of Dana Point and City of Chino Hills in the preparation of SB 743 Implementation Guidelines. She has successfully completed multimodal studies, traffic calming studies, and bike/pedestrian gap closure studies for the City of Long Beach, Port of Long Beach, City of Fullerton’s Downtown Core and Corridors, NFL Stadium/Industry Business Center and General Plan Update study efforts for the City of Industry, Chapman University in the City of Orange, and the Arts District in the City of Costa Mesa.

AREAS OF EXPERTISE
- Local Roadway Safety Plans (LRSPs) - Traffic Analysis Reports/Traffic Studies - HSIP, SS4A, ATP Grant Writing Support - SB 743, VMT Analysis - Regional & Multimodal Transportation Plans - Transportation Demand Management (TDM) - Active Transportation Plans (ATPs) - Public Transit, TOD, and Truck Studies - Complete Streets Analyses / Mobility Studies - Traffic Management Plans (TMPs), ITS - Ped & Bike Safety, Safe Routes to School - Site Access and Internal Circulation - Traffic Safety, Traffic Calming, Gap Closure - Site Design Consultation - Traffic Engineering and Transportation Planning - Traffic and Parking Field Studies - General Plans and Specific Plans - Trip Generation Studies - Parking Studies, Shared Parking - Sight Distance Analyses - Parking Management Plans (PMPs) - Traffic Signal Warrant Analyses

PROJECT EXPERIENCE
 City of Chino Hills – Local Roadway Safety Plan (LRSP)  City of Fullerton – Local Roadway Safety Plan (LRSP)
 City of Grand Terrace – Active Transportation Plan
 City of Long Beach – HSIP Funding Applications, Bike Gap Closure Studies  Port of Long Beach – Bike Gap Closure, Coastal Trail Route Analysis YEARS OF EXPERIENCE – 32 years
YEARS WITH LLG ENGINEERS – 25 years
EDUCATION – B.S. Civil Engineering, University of California, Irvine REGISTRATION – Professional Engineer, CA Registration TR 2231 Road Safety Professional RSP 981
PROFESSIONAL MEMBERSHIPS – Institute of Transportation Engineers (ITE)

Page 223 of 378 ends