15.F.

Page 650 of 1050 ends

5 City of Hemet
Warren Road Improvements
The Avenue 50 & Avenue 52 Improvements Project, led
by WEBB, involves comprehensive street enhancements
to improve mobility, safety, and regional connectivity. The project spans 2.5 miles along Avenue 50 from Jefferson
Street to the eastern Indio city limit and one mile along Avenue 52 from Madison Street to Monroe Street. These
improvements align with the City of Indio’s General Plan Update and the City of La Quinta’s Circulation Plan,
ensuring consistency with regional transportation goals.

WEBB’s scope of work includes alignment studies,
environmental approvals, right-of-way acquisition, utility coordination, and traffic signal modifications. Avenue 50 improvements incorporate a Class IV Cycle Track, pedestrian pathways, ADA-compliant sidewalks, and expanded
drainage facilities. Avenue 52 enhancements focus on
achieving the ultimate General Plan cross-section, including bike lanes, widened roadways, and traffic safety measures.

A major challenge of the project was coordinating with multiple jurisdictions (Indio, La Quinta, CVWD, IID) and addressing right-of-way impacts on 37 parcels, including residential developments, commercial properties, and the Empire Polo Club. Utility relocation required negotiations with IID for 92kV transmission lines, ensuring minimal disruptions and costeffective placement. The project also needed to comply with Coachella Valley Music and Arts Festival construction restrictions, requiring a phased construction approach.

To optimize resources, WEBB conducted in-depth research on property rights, successfully clarifying ownership responsibilities and reducing relocation costs. By securing strategic
agreements and designing around existing infrastructure, WEBB mitigated potential conflicts and streamlined approvals.

REFERENCE: Tim Wassil, Public Works Director
City of Indio
[email protected] / 760.391.4018
DURATION: 2019 - 2024
PROJECT TEAM: Dilesh Sheth, PE, TE, Myung
Choo, PE, TE Joseph Caldwell, PE, CPSWQ, QSD,
QSP, CFM, Joe Castaneda, PE (JLC), Pual Mittica,
PE (Mark Thomas)
AVENUE 50 WIDENING AND AVENUE 52 IMPROVEMENTS

CITY OF INDIO

Page 147 of 248 ends

15.F.

Page 651 of 1050 ends

6 City of Hemet
Warren Road Improvements

SIMILAR PROJECTS
AVENUE 50 BRIDGE

LA QUINTA
Mark Thomas is providing professional engineering services to prepare the plans, specifications, and engineer’s estimate (PS&E) for the replacement of the Avenue 50 low-water crossing (00L-0091) with a new all-weather bridge, Avenue 50 Bridge over the La Quinta Evacuation Channel, Federal Project No. BR-NBIL (547).

The improvements will replace the existing low-water crossing spanning the La Quinta Evacuation Channel at Avenue 50 with an all-weather access bridge. The existing Avenue 50 low water crossing is frequently inundated and damaged due to flows within the storm water channel during severe winter and summer storms. There are safety and community concerns regarding the frequent closures of the low water crossing, whereby the City determined that a replacement of the low water crossing with a new bridge is the best way to ensure all weather access is maintained for the community.

These improvements will provide Coachella Valley motorists and pedestrians a safe path of travel across the La Quinta Evacuation Channel at Avenue 50 regardless of adverse weather. The project will also provide reliable access for emergency vehicles and improve traffic circulation on Avenue 50 and the surrounding project areas.

BREA CANYON ROAD WIDENING

ORANGE COUNTY
Mark Thomas provided PS&E, geometric design and retaining wall and bridge design for the widening of nearly two miles of Brea Canyon Boulevard from Canyondale Drive to the Orange County/LA County boundary line, and the replacement of three bridges. Project improvements include widening the existing undivided two-lane roadway to a four-lane divided roadway, replacing the three existing bridges over the Brea Canyon Channel, rehabilitating the existing channel, constructing permanent retaining walls up to 65-foot-high, and replacing the traffic signal at Canyon Country Road.

CALEXICO BRIDGE WIDENING

CALEXIO
Mark Thomas served as the Engineer of Record and provided professional design services for final deliverables, including ensuring that scope, schedule, and budget are maintained. This project included close coordination with the Imperial County Transportation Commission (ICTC), Federal Highway Administration (FHWA), and Caltrans along with the U.S.

General Services Administration (GSA) to widen the existing Calexico East Port of Entry Bridge over the All-American Canal near the US/Mexico border to improve access to the existing inspection booths.

Responsibilities included all civil components of the project including a design-build, 172-foot long, clear span steel plate, girder bridge widening; roadway widening for two (2) additional commercial vehicle lanes and three (3) additional pass vehicle lanes northbound from Mexico to the Border Patrol Facility; bridge widening; box culvert extensions; drainage improvements; water quality treatment; electrical; and constructing a pedestrian foot path that connects Mexico to Border Patrol Facilities to allow safe passage across the border. Our design team delivered Release for Construction Plans in 10 months, ahead of schedule.

MARK THOMAS SIMILAR PROJECT EXPERIENCE
Client Reference: Bryan McKinney
Public Works Director/City Engineer
City of La Quinta
[email protected] | 760.777.7045

Page 148 of 248 ends

15.F.

Page 652 of 1050 ends

7 City of Hemet
Warren Road Improvements

CHERRY STREET BRIDGE

TEMECULA
Mark Thomas led the preliminary/final design and CEQA documentation efforts to construct a new interim segment of Cherry Street from Diaz Road to Adams Street, including the development of a new bridge over the Murrieta Creek. The ultimate configuration for Cherry Street is a two-lane collector facility that is centered in the City limits between Murrieta and Temecula. Mark Thomas also led the coordination efforts between both cities for consensus on the design section and standards.

In leading the efforts in the development of a roadway alignment that missed several overhead utility conflicts and design features, Mark Thomas was able to save the City over $750k in construction costs. The project included approvals from Riverside County Flood Control and the US Army Corps of Engineers, as Murrieta Creek is considered Waters of the US, and the project improvements cross a large shallow flood plain with a levee system. We worked through final design efforts and completed the CEQA document.

Page 149 of 248 ends

15.F.

Page 653 of 1050 ends

8 City of Hemet
Warren Road Improvements

JLC SIMILAR PROJECT EXPERIENCE
Case Road Widening, City of Perris (June 2020 to January 2025): JLC was a subconsultant to Webb & Associates in the development of roadway improvement plans for 2.5 miles of Case Road.

The proposed roadway improvement included the design of a road, ramp design to I-215, a bridge for the San Jacinto River and localized storm drain. Due to the magnitude of the project, JLC was tasked to perform local hydrology analysis for the proposed roadway and coordinate with Mr. Caldwell who performed the regional floodplain analysis for the San Jacinto River. The proposed design had several challenges given the constraints associated with the Regional Conservation Authority, environmental jurisdictional issues, existing utilities and topography. As part of the project improvements, JLC assessed multiple localized drainage alternatives to ensure that the project would provide flood protection for the proposed roadway.

Ono Track Expansion and Storm Drain Culvert Extensions for BNSF, City of San Bernardino (March 2019 to August 2024): JLC provided stormwater and drainage technical support for 5 miles of railroad expansion on behalf of BNSF & TKDA. JLC was under contract with TKDA to perform a regional hydrology study and a WQMP for the runoff tributary to the railroad corridor located along the westerly side of I-215. JLC was required to assess approximately 800 acres of watershed area. JLC prepared Hydrology & Hydraulic Reports to address the existing flooding and potential improvements that project required to address impacts resulting from the railroad expansion. The hydrology report and WQMP were used as part of the CEQA and NEPA processed for the project. During final engineering, JLC provided technical support for the construction of 5 proposed culvert that BNSF proposed. These culverts connected to existing storm drain infrastructure owned and operated by Caltrans. As part of the study, JLC was required to update the hydraulic model for the storm drain located along I-215. The storm drain model assessed 9,500 feet of existing storm drain. Moreover, JLC was requested to provide technical support to coordinate with the Caltrans Hydraulic Section during the agency processing phase of the project. The proposed hydraulic reports for the proposed storm drain were submitted to Caltrans for review and approval.

Jackson Avenue Street Improvements, City of Indio & County of Riverside (July 2022 to August 2024): JLC provided stormwater and drainage technical support for 1.5 miles of roadway improvements for Jackson Avenue which extended from Avenue 49 to Avenue 52. The project was a multi-agency project which included the City of Indio and the County of Riverside. JLC was under contract with Webb & Associates to provide regional & localized hydrology assessment for the project. Due to the lack of drainage infrastructure, JLC and Webb worked on several drainage solutions that promoted the use of infiltration to reduce the flooding within the proposed roadway improvements. The drainage goal of the project was to develop a solution that would not worsen the existing drainage conditions along Jackson Avenue, Avenue 50, Avenue 51 and Avenue 52.

Page 150 of 248 ends

15.F.

Page 654 of 1050 ends

9 City of Hemet
Warren Road Improvements

SECTION
II.
9 PERSONNEL

Page 151 of 248 ends

15.F.

Page 655 of 1050 ends

10 City of Hemet
Warren Road Improvements

ORGANIZATIONAL CHART
Dilesh Sheth, PE, TE, will be the City’s main point of contact and will lead the assigned team on the City’s project. The following organization chart summarizes the project team that will be available throughout the duration of the City’s important project.

BRIDGE
Mark Thomas

GEOTECHNICAL
Inland Foundation

STREET LIGHT
Visual Concepts

AERIAL TOPOGRAPHY
Inland Aerial

POTHOLING
Ultra Engineering

RAILROAD CROSSING
Pacrail

TRAFFIC MODELING
Translutions

UTILITY COORDINATION
Monument

TRAFFIC COUNTS
Counts Unlimited

BACKUP PROJECT MANAGER
Eric Hays, PE
Senior Engineer
C 73614 (CA)

SALT CREEK DRAINAGE
Joseph Caldwell, PE, CPSWQ, QSD, QSP, CFM
Water Resources Practice Leader
C 67239 (CA)

PRINCIPAL-IN-CHARGE/PROJECT

MANAGER

POINT-OF-CONTACT
Dilesh Sheth, PE, TE
Senior Vice President
C 65078 (CA)

SIGNING AND STRIPING, TRAFFIC SIGNAL, AND

STREET LIGHT
Nick Lowe, PE, TE
Deputy Director, Traffic and Transportation
C 87666 (CA)
Son Le
Associate Engineer

SUB-CONSULTANTS

WEBB TEAM

STREET DRAINAGE
Joseph Castaneda, PE
Senior Engineer
C 59835 (CA)

STREET IMPROVEMENTS
Myung Choo, PE, TE
Traffic and Transportation Practice Area
Leader
C 79651 (CA)
Joy Schwiebert
Assistant Engineer
Mark Thomas
Paul Mittica, PE
Senior Project Engineer
C 84987 (CA)
Rachel Yazawa-Taylor, PE
Assistant Engineer
C 94051 (CA)

SURVEY AND RIGHT OF WAY DOCUMENTS
Michael Johnson, LLS
Senior Engineer
LLS 7673 (CA)
Jason Ardery, PE, TE, LLS, CPESC, QSD, QSP
Vice President
C 71508 (CA)

BRIDGE WIDENING
Mark Thomas
Jason Hickey, SE
Structures Lead
S 5783 (CA)
Lynn Odgiiv, SE
Structural Engineer
S 6838 (CA)

Page 152 of 248 ends

15.F.

Page 656 of 1050 ends

11 City of Hemet
Warren Road Improvements

DILESH SHETH, PE, TE
SENIOR VICE PRESIDENT | TRAFFIC AND TRANSPORTATION
Dilesh Sheth, PE, TE, is a Senior Vice President with WEBB and is Director of the Traffic & Transportation Department. Dilesh assists public and private clients with sophisticated civil works projects. Clients benefit from his expertise in presenting project findings and recommendations to elected officials, municipal commissions, community groups, and the general public.

Dilesh has coordinated projects with Caltrans and numerous counties, cities, flood control districts, utility companies, residential, and business owners throughout Inland Southern California. This experience enables him to help clients realize a wide range of project goals and comply with varied requirements. He balances the needs of the community with the needs of local jurisdictions to bring positive solutions to difficult situations and projects. Dilesh’s technical experience includes highway design, intersection and interchange improvements, street widening, alignment studies, and geometrics’ drawings. His recent projects include a diverse range of roadway design, freeway ramp improvements, residential development street design, traffic signal design, traffic control plans, signing and striping plans, and pedestrian and bike facilities. He has also handled site access evaluation, intersection capacity analysis, traffic forecasting, circulation planning, traffic impact studies, parking studies, parking demand analysis, transportation demand management plans, focused site specific traffic studies, and area-wide circulation studies.

Dilesh is currently serving as the Program Manager for the on-call traffic engineering services for the cities of Palm Springs, Cathedral City, Lake Elsinore, and Grand Terrace, and the County of Riverside. Through his efforts, Dilesh has been able to raise over $24.3 million in funds from HISP and CVAG for these cities and their numerous projects.

A large majority of these projects were completed without any matching funds needed from the City.

PROJECT EXPERIENCE:

On-Call Traffic Engineering Services
City of Indio | Program Manager
Dilesh serves as the Program Manager for these projects. WEBB is currently providing traffic engineering services to assist in completing the City’s projects. WEBB has providing traffic and transportation engineering services including, but not limited to:
• Madison Street and Storm Drain Improvement Project
• Avenue 50 and Avenue 52 Street and Storm Drain Improvement Project • The Civic Center Storm Drain and Oasis Street Beautification Projects • Indio Sports Park Project
• Complete Streets Plan with Drainage Master Plan
• Jackson Storm Drain Evaluation
REGISTRATIONS:

Registered Civil Engineer C 65078
(CA)
Registered Civil Engineer C 14934
(NM)
Registered Traffic Engineer TE 2112
(CA)
EDUCATION:

BS, Civil EngineeringUniversity of
Saurastra Rajkot, India
AFFILIATIONS:

American Public Works Association
(APWA), Coachella Valley
Institute of Transportation
Engineering (ITE) Riverside and San
Bernardino Counties

Page 153 of 248 ends

15.F.

Page 657 of 1050 ends

12 City of Hemet
Warren Road Improvements

DILESH SHETH, PE, TE
SENIOR VICE PRESIDENT | TRAFFIC AND TRANSPORTATION
On-Call Traffic Engineering Services
County of Riverside | Principal in Charge
Dilesh serves as Principal-in-Charge for this on-call. WEBB has been providing on-call traffic and transportation engineering services to assist the County in collaborating with Caltrans and Riverside County Transportation Commission (RCTC) to resolve traffic and transportation issues and improve the County’s network since 2003. Our depth of technical staff and understanding of transportation department needs has led to our success in providing services on time and within budget. Principle responsibilities include: Prepared the traffic signal, signing and striping, traffic control plans, prepare street improvement and storm drain plans, prepare traffic impact analysis, prepare specifications, designs, cost estimates, bid proposals, and legal descriptions, serve as a Project Manager for the Capital Improvement Projects, represent the County in meetings with contractors, developers, consultants, utilities, and others, provide coordination with Caltrans, RCTC, Flood Control Districts, and other agencies, and prepare collision and safety analysis.

Palm Springs Corridor & Traffic Signal Improvements
City of Palm Springs | Project Manager
Dilesh serves as the Project Manager for these projects. WEBB is currently providing on-call civil and traffic engineering services to the City of Palm Springs to assist with the City’s Capital Improvement Project, including obtaining grant funding and resolving traffic and transportation issues throughout the City. WEBB provided traffic and transportation engineering services for the following projects:
• Indian Canyon Two-Way Conversion, Pedestrian, & Bicycle Safety Enhancements - WEBB is providing engineering services for the Indian Canyon Two-Way Conversion, Pedestrian, and Bicycle Safety Project. WEBB provided pedestrian countdown heads, pedestrian detection, accessible pedestrian signals, leading pedestrian phasing, protected left-turn phasing, high visibility crosswalks, advanced stop lines, street lighting, and curb bulb-outs with ADA-accessible wheelchair ramps at nine intersections throughout the City • North Palm Canyon Drive Pedestrian Safety Enhancement Project - This project consisted of the signalized intersections in the downtown area of the City of Palm Springs along Palm Canyon Drive from Tachevah Drive to Ramon Road. Each of the 10 intersections has basic crosswalk markings. WEBB assisted the City with a study, preparation of CVAG funding application, design of traffic signals, street improvements and ADA ramps, and utility coordination
• Vista Chino (SR-111) and Via Miraleste and North Palm Canyon Drive (SR-111) and Via Escuela Intersection Improvement Project - WEBB assisted the City with a study, preparation of CVAG funding application, design of traffic signal, street improvements and ADA ramps, utility coordination, and Caltrans Encroachment Permit applications

Page 154 of 248 ends

15.F.

Page 658 of 1050 ends

13 City of Hemet
Warren Road Improvements

ERIC HAYS, PE
SENIOR ENGINEER | WATER RESOURCES
Eric Hays, PE, is a Senior Engineer with WEBB’s Water Resources Department.

Eric has years of diverse engineering experience with deep knowledge in the fields of hydrology, hydraulics, and drainage design. His experience includes the preparation of preliminary design reports, alternative analysis studies, canal design plans for flood control infrastructure projects, and storm drain system designs for residential, commercial, industrial, and public agency projects.

In addition to Eric’s extensive experience with drainage project design, he offers clients strong civil site development and an extensive public project background.

His experience includes development of site grading plans, street improvements plans, sewer plans, bike trail plans, Water Quality Management Plans, Stormwater Pollution Prevention Plans, and railroad grade crossing improvement plans. His expertise also includes survey, construction staking, construction observation, and support.

PROJECT EXPERIENCE:

University Wash Final Design
Riverside Flood Control & Water Conservation District | Project Engineer Eric served as Project Engineer for the project. The University Wash Storm Drain Project included the planning, analysis, and design of a large diameter master plan storm drain that connects existing upstream and downstream facilities together. This project was unique in that the 2,450 LF, 90-inch RCP required for this project had to be designed to maneuver its way through a developed industrial corridor of the City. Key to this project was the coordination with local businesses to ensure construction of the storm drain minimized impacts to business operations.

Cole Avenue Storm Drain Improvements
City of Riverside - Public Works Department | Project Engineer The Cole Avenue Storm Drain Improvements between Lurin Avenue and Krameria Avenue conveyed runoff from the surrounding residential developments and discharged to a new outlet structure, eliminating continual nuisance drainage problems as well as eliminating flooding problems associated with the intersection flooding that occurs during most storm events. The project watershed is developed along residential home sites. There were no storm drain systems except along Lurin Avenue. The watershed area was subject to surface runoff within the street right-of-way. The area was also subject to nuisance runoff associated with landscape irrigation on a frequent basis. WEBB designed 2,500- FT of storm drain improvements that reduced nuisance flows in the tract and in the roadside channel on the south side of Lurin Avenue to meet the future needs of the area. The alignment WEBB selected discharges runoff into the existing drainage feature 350-FT west of the intersection of Cole Avenue and Lurin Avenue via an impact energy dissipater structure to reduce the construction footprint within the existing right-of-way. This minimized the need for additional right-of-way and reduced the impact to existing vegetation. The system was designed so to easily connect to the future drainage system in Cole Avenue.

REGISTRATIONS:

Registered Civil Engineer C 73614
(CA))
EDUCATION:

BS, Civil Engineering California State
Polytechnic University, Pomona
AFFILIATIONS:

American Society of Civil Engineers
(ASCE)

Page 155 of 248 ends

15.F.

Page 659 of 1050 ends

14 City of Hemet
Warren Road Improvements

NICK LOWE, PE, TE
DEPUTY DIRECTOR | TRAFFIC AND TRANSPORTATION
Nick Lowe, PE, TE is a Deputy Director with WEBB’s Traffic and Transportation Department. Nick assists clients with traffic signal upgrades, signing and striping modifications, and pavement improvements. He also develops temporary traffic control plans for construction while working closely with public agencies, contractors, and construction managers to safely expedite projects, thus minimizing impacts to traffic and businesses.

In addition, Nick assists other engineers on street improvements, street light installations, sewer and water plans, and expert witness testimony. He is also wellversed in the AutoTURN vehicle simulation program which assists in transportation improvements for constrained travel areas and parking lots. With increasing traffic pressure amid booming growth throughout Inland Southern California cities, Nick’s work on regional transportation solutions provides a tangible benefit to the public through improvements in safety, mobility, and quality of life. Nick is active in several industry associations.

Nick provides grant funding assistance to the cities of Lake Elsinore, Palm Springs, and Cathedral City and has helped these cities secure over $20.9 million in funding, with little matched funds needed from the City, to install advanced dilemma zone detection, flashing beacons, and left turn phasing at over 50 signalized intersections.

PROJECT EXPERIENCE:

Madison Street Improvements
City of Indio | Project Engineer
As Project Engineer Nick prepared traffic signal and signing and striping plans. The WEBB Team prepared the alignment study, Project Design Report, environmental, utility relocation, right-of-way acquisition, roundabout feasibility, preparation of Plans, Specifications, and Cost Estimates (PS&E), construction, and multi-agency coordination efforts. Madison Street from Avenue 50 to Avenue 52 is an approximately one mile long arterial roadway located within the City of Indio and the City of La Quinta.

On-Call Civil Traffic Engineering Services
City of Palm Springs | Project Engineer
Nick serves as Project Engineer for the City of Palm Springs’ On-Call Traffic Engineering Services Contract. WEBB is currently providing civil and traffic engineering services to assist in completing City projects, grant funding, and resolving traffic and transportation issues throughout the City.

Calhoun Street Improvements
City of Indio | Project Engineer
Nick prepared signing and striping plans for this project and assisted in the preparation of the street improvement plans. The Project improved driveway and ADA ramps along Calhoun Street between Dr. Carreon Boulevard and Highway 111 to improve pedestrian safety and travel routes.

REGISTRATIONS:

Registered Civil Engineer - C 87666
(CA)
Registered Traffic Engineer TE 3065
(CA)
EDUCATION:

MS, Civil Engineering University of
Southern California
BS, Civil Engineering Stevens
Institute of Technology
AFFILIATIONS:

Institute of Transportation Engineers
(ITE)
American Society of Civil Engineers
(ASCE)
Intelligent Transportation Society of
California (ITS)

Page 156 of 248 ends

15.F.

Page 660 of 1050 ends

15 City of Hemet
Warren Road Improvements

NICK LOWE, PE, TE
DEPUTY DIRECTOR | TRAFFIC AND TRANSPORTATION
Art and Music Line
Coachella Valley Association of Governments | Project Engineer Nick served as Project Engineer for this project. WEBB is actively collaborating with CVAG on the innovative Art and Music Line Project, delivering 15 miles of enhanced bikeways across various locations. This comprehensive initiative includes nine miles of protected bicycle facilities, promoting separation from vehicle traffic, and over six miles of traditional bike lanes. The project focuses on safety and accessibility, with unique elements like lighting and sound for access to festivals at the Empire Polo Grounds. WEBB played a key role in securing $36 million in ATP Grant funds and introduced innovative features like bicycle signals, raised crossings, and more.

On-Call Traffic Engineering Services
City of Lake Elsinore | Project Manager
Nick serves as the Project Manager for the On-Call Traffic Engineering Services Contract for the City. WEBB provides support to City Staff and assists in resolving traffic and transportation projects and concerns within the City. WEBB provided traffic and transportation engineering services for the following projects:
• Highway Safety Improvement Program Grant Application (Cycle 8): WEBB applied for federal funding through Caltrans’ HSIP in 2016 for the City of Lake Elsinore. The City was awarded $825,300 to install advanced dilemma zone detection, flashing beacons, and left turn phasing at eight signalized intersections without any matching funds. WEBB sorted through city-wide historical collision data using the Statewide Integrated Traffic Records System and conducted field reviews of the high-incident intersections to determine countermeasures. The application resulted in a very high benefit/cost ratio of 13.21 • Caltrans Systemic Safety Analysis Report Program: WEBB applied for and received funding for the Caltrans Systemic Safety Analysis Report Program in 2016 for the City. The City was awarded $55,000 to prepare the report with $5,500 in matching funds
• Striping Improvements: WEBB prepares signing and striping plans for known “trouble spots”, slurry seal projects, and bike lanes. WEBB designs the plans to enhance safety and traffic operations while adding to the City’s budding bike lane network
• Railroad Canyon Road Interchange Monitoring System: WEBB worked with City Staff, Caltrans, and McCain, Inc. to design and install traffic monitoring cameras and a communications system for five intersections at the Railroad Canyon Road/I-15 Interchange. WEBB and City Staff can now monitor traffic in real-time at those intersections and modify signal timings when needed • Traffic Control Plan Check: WEBB receives and plan checks all submitted temporary traffic control plans for impending construction projects to ensure conformance with the latest edition of the California MUTCD.

WEBB works with the City and the applicant to provide safe working areas for workers and the traveling public
• Speed Surveys: WEBB conducted speed surveys on 44 roadway segments throughout the City to update the posted speed limits and ensure the continuation of legal speed enforcement • School Zones: WEBB procured and installed speed feedback signs at all schools within the City’s limits to further reinforce the locations of school zones. WEBB also observes school drop-off and pickup times and procedures and works with school staff to determine safety and operational improvements

Page 157 of 248 ends

15.F.

Page 661 of 1050 ends

16 City of Hemet
Warren Road Improvements

JOSEPH CALDWELL, PE, CPESC, CPSWQ,

QSD, QSP, CFM
PRACTICE AREA LEADER | WATER RESOURCES
Joseph Caldwell, PE, CPESC, CPSWQ, QSD, QSP, CFM, is the Practice Leader of WEBB’s Water Resources Department. As the Water Resource’s Practice Leader, Joseph is responsible for training, skill development, and the quality assurance/quality control program. He leads the QA/QC reviews for all submittals and coordinates with project managers and engineers to ensure the appropriate reviews are completed as projects proceed to final design. Joseph focuses on developing master drainage plans, designing backbone drainage infrastructure, and designing water quality systems for flood control projects throughout the region. A Certified Professional in Erosion and Sediment Control and Storm Water Quality, Joseph specializes in water quality and environmental compliance and is an expert in hydrology and hydraulics.

Joseph’s experience includes designing regional flood control basins, a flood control levee, master drainage plans, and several miles of backbone drainage infrastructure. He has also hydrologically and hydraulically modeled the San Jacinto River from Railroad Canyon to the existing Army Corps levee in the City of San Jacinto. Joseph’s extensive knowledge of local agencies’ design standards and procedures and effective working relationships with agency staff enable him to expedite projects through completion.

PROJECT EXPERIENCE:

North Indio Regional Flood Control Channel Project
Coachella Valley Water District | Technical Lead
Joseph is the Technical Lead for the North Indio Regional Flood Control Channel Project which is a key component of the CVWD flood protection mission in the Coachella Valley. The project will complete the link between existing flood control facilities in the north Indio area, providing increased flood protection for the region. The project consists of over three miles of concrete lined trapezoidal and rectangular channels, including numerous culvert crossings of existing and future streets. To date, WEBB has prepared the hydraulic analysis, preliminary design, and environmental documentation for the project. WEBB is currently in the process of preparing the final design plans, specifications, and estimates. WEBB is also responsible for preparing the CLOMR and providing public outreach and right-of-way acquisition services.

University Wash Channel
Riverside County Flood Control and Water Conservation District | Technical Lead Joseph was Technical Lead for the University Wash Storm Drain Project including the planning, analysis, and design of a large diameter master plan storm drain that connects existing upstream and downstream facilities together. This project was unique in that the 2,450-LF - 90-inch RCP required for this project had to be designed to maneuver its way through a developed industrial corridor of the City. Key to this project was the coordination with local businesses to ensure construction of the storm drain minimized impacts to business operations.

REGISTRATIONS:

Registered Civil Engineer C 67239
(CA)
Registered Civil Engineer C 030017
(NV)
Registered Civil Engineer C 76114
(AZ)
Certified Professional in Erosion and
Sediment Control (CPESC) 5311
Certified Professional in Stormwater
Quality (CPSWQ) 544
EDUCATION:

MS, Civil Engineering Brigham Young
University
BS, Civil Engineering Brigham Young
University
AFFILIATIONS:

American Society of Civil Engineers
(ASCE)
American Public Works Association
(APWA)
California Storm Water Quality
Association (CASQA)
Floodplain Management Association
(FMA)

Page 158 of 248 ends

15.F.

Page 662 of 1050 ends

17 City of Hemet
Warren Road Improvements

JOSEPH CALDWELL, PE, CPESC, CPSWQ, QSD, QSP, CFM
PRACTICE AREA LEADER | WATER RESOURCES
San Jacinto River Stage 3 Master Drainage Plan
Riverside County Flood Control and Water Conservation District | Project Manager Joseph served as Project Manager for the WEBB Team responsible for reviewing the current hydrological model, analyzing potential alternative models, and working with the District to decide the best option based on the current Master Drainage Plan. This project consisted of preparation of conceptual drawings for the Master Plan addressing all key elements such as floodplain management, flood control features, environmental preservation, development opportunities, effects on regional infrastructure, right-of-way requirements, and order of magnitude cost. WEBB worked directly with the District to prepare the planning study, coordinated with all stakeholders, and presented all findings to the Advisory Board with recommendations for the next steps (i.e., MSHCP compliance, CEQA strategy, land development constraints, and floodplain management). WEBB is currently working on the final MDP and EIR for the District.

Hemet MDP Line C, Stage 4
County of Riverside Flood Control and Water Conservation District | Project Manager Joseph was the Project Manager for the Hemet MDP Line C, Stage 4 Project. The extension of the Hemet MDP Line C was an important component to provide surface flooding relief and flood protection of a predominately developed portion of the City of Hemet. The extension of the Hemet MDP Line C was an important component to provide surface flooding relief and flood protection of a predominately developed portion of the City of Hemet. This segment of the Master Plan Facility represents the middle one third of the entire Line C System. A critical component of this project was implementing a master planned facility in a highly urbanized area while extremely constrained by multiple utilities. WEBB completed a Preliminary Design Report that outlined the most feasible alignment for this facility. WEBB is currently preparing final design plans and specifications for this backbone drainage facility.

Bedford Wash Channel
Riverside County Flood Control and Water Conservation District | Project Manager Joseph is the Project Manager for the Bedford Wash Channel upstream on the McMillan Property. Services provided included finalizing the 30% design, preparation of all necessary studies, designs for the final construction drawings, preparation and processing of the Cooperative Agreement, and Agency approvals as well as providing on-going coordination with the project team during the design of the overall project and with the environmental consultant to assist with obtaining any regulatory permits associated with the channel construction. WEBB provided three iterations of channel design from the point the project was secured, when it was a completely lined concrete channel.

Through WEBB’s recommendation, the project stakeholders strategically selected to move toward transitioning the channel to a soft bottom.

Heacock Channel Design Project
March Joint Powers Authority | Project Manager
Joseph served as the Project Manager for Phase 3 of the Heacock Channel Design Project for the March Joint Powers Authority. The project included the preparation of final improvement plans, traffic control plans, and a hydrology and hydraulic report for approximately 3,600-LF of the channel. The project extends from Lateral A of the Perris Valley Storm Drain north along Heacock Avenue to the southern end of an existing landfill. WEBB’s services also included project management and coordination throughout the duration of the project, including attendance at project design team meetings, quality control services, and all other processing of improvement for necessary project approvals.

Page 159 of 248 ends

15.F.

Page 663 of 1050 ends

18 City of Hemet
Warren Road Improvements
For over fifteen years, Myung has been a dedicated
Senior Design Engineer at WEBB, contributing to traffic and transportation projects, including numerous intricate roadway enhancements. His engineering expertise was
instrumental in the Snowdrop and Sun Lakes Street
Improvement Projects; both presented similar critical challenges such as hillside grading, rock slope protection, construction of retaining walls, drainage enhancements, right-of-way acquisitions, and utility relocations. Myung’s strong technical acumen encompasses a thorough understanding of the Caltrans and AASHTO Standards, the project’s technical facets, design principles, construction methodologies, and pertinent regulations and standards.

Joy Schwiebert is an Assistant Engineer with WEBB’s Traffic and Transportation Department. Joy has assisted with
the development of construction projects related to deep foundations and has performed take-offs, written submittals, RFIs, and various other construction documents. Joy has served as an assistant project engineer for a wide range of projects involving urban highway design and rehabilitations, railroad grade separation, master planned drainage facility design, water and wastewater facility design, hydrology and hydraulics studies, water quality facility design, and various residential, commercial, and industrial developments.

MYUNG CHOO, PE, TE

PRACTICE AREA LEADER

JOY SCHWIEBERT

ASSISTANT ENGINEER
Son Le is an Associate Engineer with WEBB’s Traffic and Transportation Department. Son is a dedicated engineer with a superb work ethic and customer satisfaction record. His roles have included working on projects independently to completion or as a member of a professional engineering team. Son’s background knowledge and experience is weighted toward relevant safety standards pertaining to civil engineering, particularly with respect to transportation safety. He also has experience in designing temporary traffic control, signals, street lighting modifications, and re-striping of streets.

SON LEE

ASSOCIATE ENGINEER

Page 160 of 248 ends

15.F.

Page 664 of 1050 ends

19 City of Hemet
Warren Road Improvements
Michael Johnson, LLS, is the Practice Area Leader of
WEBB’s Land Survey and Mapping Department. With years
of experience in all aspects of surveying, Michael handles initial project coordination and research, performs survey data adjustments and analysis, and oversees and provides construction staking through final as-built and ALTA surveys. Michael has supervised several field crews, providing training for technical office and support staff. From entitlement to field survey and construction through delivery of a completed product, he has the knowledge and experience to offer the entire range of services to any municipal, private development, or construction company. Michael has worked in both the private and public sectors of development, gaining experience with subdivisions, retail centers, commercial distribution centers, pipelines, tank site & reservoir projects, mass grading and hillside slope projects, hospitals, schools, training facilities for fire & police, highways, channels, parking structures, and more. Michael is responsible for providing technical support, survey analysis, overseeing all survey work, and management for specific projects. He provides expertise and a broad range of skills for solutions to complex and large-scale projects.

MICHAEL JOHNSON, LLS

LAND SURVEY PRACTICE AREA LEADER
As an experienced civil engineer and land surveyor, Jason brings a wealth of experience in planning, designing, and managing complex projects from conception to completion.

With 19 years of experience in the field, Jason has established a reputation for delivering high-quality results that meet or exceed client expectations. Jason is a licensed civil engineer, traffic engineer, land surveyor, Certified Professional in Erosion and Sediment Control (CPESC), a Qualified SWPPP Developer (QSD) and Qualified SWPPP Practitioner (QSP), a small Unmanned Aircraft System (sUAS) Remote Pilot, and holds a Bachelor of Science degree in Civil Engineering from California State Polytechnic University, Pomona. Jason is also a member of professional organizations such as the American Society of Civil Engineers and serves as the President of his current HOA. With Jason’s extensive knowledge and experience in civil engineering and land surveying, Jason is well-equipped to provide clients with the highest level of service and expertise.

JASON ARDERY, PE, TE, LLS,

CPESC, QSD, QSP

VICE PRESIDENT

Page 161 of 248 ends

15.F.

Page 665 of 1050 ends

20 City of Hemet
Warren Road Improvements
Joseph Castaneda, PE,
Principal Engineer/ Drainage Task Leader
Tasks to be Involved: Hydrology & Hydraulic Studies, Culvert & Floodplain Assessments
[Brief Biography/Key Qualifications] Mr. Castaneda has been working in the stormwater and drainage field for over 27 years. His career has focused on projects with major flooding and drainage constraints. Mr. Castaneda has been an On-Call Consultant with RCFC&WCD since 2008 and actively performing work for the City of Hemet & RCFC&WCD on the Hemet Valley Master Drainage Plan.

Relevant Project Experience
Tract Map 38979, City of Hemet, CA (January 2024 to Present): Drainage Task Leader, Mr.

Castaneda is the drainage consultant in the design of a residential project adjacent to Warren Road. The project consist of 200 residential lots and 3 detention/water quality basins. The project extends just north of Devonshire Avenue and south of Esplanade Avenue. JLC was required to study 130 acres of drainage area from a hillside area that impacted the property and Warren Road. The major drainage goal was to investigate drainage solutions that would minimize the flooding along Warren Road.

Historical Flood Plain Analyses for Vernal Pool Complex Along MWD Aqueduct, City of Hemet CA (March 2005 to June 2007): Mr. Castaneda was the Project Manager that lead a drainage team that studied the existing vernal pool complex located along the MWD Aqueduct as part of the Garret Ranch Development that was a 200 acre project bounded by Florida Avenue, Warren Road, Myers Road and Devonshire Avenue. The Vernal Pool Complex is roughly located between Florida Avenue and extends south to Hemet Channel. JLC was requested to assess the hydrology and floodplain for the vernal pool area at the request of the Riverside Regional Conservation Authority. As part of the Vernal Pool study, JLC assessed over 4,500 acres of drainage area that was tributary to the vernal pool complex.

Approximately 1,800 acres of the drainage area are tributary to Warren Road. The purpose of the study was to understand the flooding and inundation areas along roadways and undeveloped land upstream and downstream of the vernal pool complex.

Tract Map 36510 Mass Grading Drainage Report, City of Hemet, CA (June 2021 to December 2022): Mr. Castaneda was retained by Richland and MBI to assess the existing floodplain upstream of Warren Road north of Florida Avenue. The purpose of the study was to assess how the proposed development that proposed to construct a regional basin would alter the runoff from a 1,300 acre watershed upstream of the Devonshire Avenue and Myers Road Intersection. The drainage study assessed the existing floodplain using 1 foot topographical mapping and the hydrology model developed for the upstream drainage area.

Hemet Valley Master Drainage Plan, City of Hemet & County of Riverside, CA (2014 to Present):

JLC is a subconsultant to MBI providing hydrology and hydraulic technical expertise to develop a Master Drainage Plan for an area roughly Bounded by Florida Avenue to the north, Domenigoni Parkway to the south, California Road to the west and Sanderson Road to the east. The purpose of the Master Drainage Plan is to provide proposed master drainage plan alignments for areas that have not been assessed and coordinate the proposed alignment with the existing approved Master Drainage Plans. The purpose of the Hemet Valley Master Drainage Plan is to provide proposed and updated alignment that will provide flood protection for the area that is within the City of Hemet sphere of influence and ensure that the system account for the existing development that is currently in place.

EDUCATION:

B.S., Civil Engineering, California
State University Los Angeles, 1996

REGISTRATIONS &
CERTIFICATIONS:

Professional Civil Engineer,
California, 1998, No. 59835
Qualified Stormwater Practioner
California 2008, No.21364
YEARS OF EXPERIENCE: 27
YEARS WITH JLC: 17

Page 162 of 248 ends

15.F.

Page 666 of 1050 ends

21 City of Hemet
Warren Road Improvements

CALEXICO BRIDGE WIDENING, CALEXICO
Design manager responsible for overseeing design
services and final deliverables, including ensuring that scope, schedule, and budget are maintained. Under Paul’s leadership, the design team delivered Release for
Construction Plans in 10 months, ahead of schedule. Paul represents the Mark Thomas team, serving as Engineer of Record in a subconsultant role to Hazard Construction.

ICTC, FHWA, and Caltrans along with the U.S. General
Services Administration (GSA) propose to widen the
existing Calexico East Port of Entry Bridge over the AllAmerican Canal near the US/ Mexico border to improve access to the existing inspection booths. Mark Thomas’s responsibilities included all civil components of the project including roadway widening for two additional commercial vehicle lanes and three additional pass vehicle lanes NB from Mexico to the Border Patrol Facility; bridge widening; box culvert extensions, drainage improvements, water
quality treatment, electrical, and constructing a pedestrian foot path that connects Mexico to Border Patrol Facilities to allow safe passage across the border.

CHERRY STREET BRIDGE, TEMECULA
Project manager responsible for the design of roadway
extension and the Murrieta Creek crossing for the City of Temecula. The project provided an interim roadway
connection from the existing Cherry Street to the
proposed new intersection, requiring a crossing over the Murrieta Creek. Extensive coordination with RCFC & WCD, RCWD, and RCA. Today, Cherry Street serves as a divided four lane arterial roadway facility that provides connectivity from Diaz Road to French Valley Parkway for the residents in the cities of Murrieta and Temecula.

BREA CANYON ROAD WIDENING, ORANGE COUNTY
Senior project engineer responsible for the design to
widen nearly two miles of Brea Canyon Boulevard from
Canyondale Drive to the Orange County/LA County
boundary line. The project improvements include
widening the existing undivided two-lane roadway to a
four-lane divided roadway, replacing the three existing bridges over the Brea Canyon Channel, rehabilitating the existing channel, construction permanent retaining walls up to 65-feet-high, and replacing the traffic signal at Canyon County Road. The project involves complex
construction staging to keep the roadway in operation
during construction, as it is a reliever route for SR 57.

LA QUINTA AVENUE 50 BRIDGE, LA QUINTA
Project manager responsible for providing professional
engineering services to prepare the PS&E for the
replacement of existing low-water crossing spanning the La Quinta Evacuation Channel at Avenue 50 with an allweather access bridge. The existing Avenue 50 low water crossing is frequently inundated and damaged due to
flows within the storm water channel during severe winter and summer storms.

STETSON AVENUE BRIDGE, HEMET
At a prior firm, Paul, managed the preliminary and final design engineering services for the replacement of a
failing bridge. The existing Stetson Bridge spans 60 feet across Hemet Channel and is 28 feet wide
accommodating two lanes. Due to decay and flexural
damage, the Stetson (Hemet Channel) Bridge is
considered structurally deficient. An early execution of the NEPA/CE was allowed due to innovative strategies to
reduce the project footprint. It reduced the project
schedule and cost.

PAUL MITTICA, PE

ROADWAY/CIVIL LEAD

EDUCATION
BS in Civil and Environmental Engineering, Pennsylvania State University

REGISTRATION
CA PE C84987
Paul has 25 years of experience in municipal, transportation, and project management experience. He is a recognized leader within the Inland Empire. He has experience ranging from large complex Caltrans state highway projects to local civil and traffic improvement projects. He has developed engineering and geometrics for 30 intersections, 10 interchanges, and over 40 miles of freeway improvements. He has recently focused his efforts to integrate and navigate projects through the environmental and final design processes with many years of relevant work and relationships throughout the area. Paul brings a thorough understanding of project delivery from inception to completion.

REPRESENTATIVE PROJECTS

Page 163 of 248 ends

15.F.

Page 667 of 1050 ends

22 City of Hemet
Warren Road Improvements

LIMONITE GAP CLOSURE, EASTVALE
Project engineer responsible for providing preliminary
design, CEQA clearance, and final design to close the gap in the existing Limonite Avenue corridor. The project will include a 2,450-foot, 4-lane roadway, Class IV protected bikeways, wide sidewalks, new bridge over the
Cucamonga Creek channel, and bridge aesthetics and
landscape architecture. The bridge over the channel will be a 377-foot, three-span concrete bridge and a
challenging 60-degree skew. Additionally, the City wants to construct a new bicycle/pedestrian bridge for the Class I trail located within the SCE right of way. The project will also involve coordination with USACE and private
developers.

US 101/OLIVE MILL ROAD AND SAN YSIDRO INTERCHANGES,
SBCAG
Design engineer for PS&E of interchange improvements at Olive Mill Road and San Ysidro Road at US 101 for Santa Barbara County Association of Governments (SBCAG). This project will provide much needed traffic congestion relief along the local frontage roads to US 101. It will also
alleviate the anticipated increase in traffic volume due to the planned US 101 HOV improvements. Both interchanges
will be roundabouts. The project is on an accelerated
delivery model using CMGC.

CHERRY STREET BRIDGE, TEMECULA
Project engineer for the design of roadway extension and the Murrieta Creek crossing for the City of Temecula. The project will provide an interim roadway connection from the existing Cherry Street to the proposed new
intersection, requiring a crossing over the Murrieta Creek.

Extensive coordination with RCFC & WCD, RCWD, and
RCA. Today, Cherry Street serves as a divided four lane arterial roadway facility that provides connectivity from Diaz Road to French Valley Parkway for the residents in the cities of Murrieta and Temecula.

CANNON STREET WIDENING, ORANGE
Project engineer for widening portions of Cannon Street between Santiago Canyon Road and Serrano Avenue in
the City of Orange with three northbound lanes within
these project limits. The existing span of Cannon Street consists of two northbound through lanes and two
southbound through lanes separated by a painted median
which opens to accommodate left-turn pockets at various intersections. The existing configuration also includes class II bike lanes in both northbound and southbound
directions. Mark Thomas is leading the environmental
clearance, bridge widening, traffic engineering and
landscape architecture efforts while providing overall
support services for survey, geotechnical, hydrology&
hydraulic analysis and right of way engineering.

STETSON AVENUE BRIDGE, HEMET
At a prior firm, Paul, managed the preliminary and final design engineering services for the replacement of a
failing bridge. The existing Stetson Bridge spans 60 feet across Hemet Channel and is 28 feet wide
accommodating two lanes. Due to decay and flexural
damage, the Stetson (Hemet Channel) Bridge is
considered structurally deficient. An early execution of the NEPA/CE was allowed due to innovative strategies to
reduce the project footprint. It reduced the project
schedule and cost.

RACHEL YAZAWA-TAYLOR, PE

ROADWAY/CIVIL

EDUCATION
BS in Civil Engineering, California State Polytechnic University, Pomona

REGISTRATION
CA PE C94051
Rachel has 10 years of civil engineering experience in roadway and highway design. Her experience includes pavement management programs, street design, cost estimation, report writing, and data collection. She is well-versed in Caltrans standards from working on several Highway 1 interchanges in Santa Cruz County. Rachel participates in designing engineering plans and specifications for the construction of roadways, interchanges, improved bicycle & pedestrian accommodations, raised and landscaped medians, utility relocations, etc.

REPRESENTATIVE PROJECTS

Page 164 of 248 ends

15.F.

Page 668 of 1050 ends

23 City of Hemet
Warren Road Improvements
SR 60/PORTERO BOULEVARD INTERCHANGE, BEAUMONT
Structures engineer supporting the PA&ED and PS&E
documents to construct a new interchange connection to
SR 60 at Potrero Boulevard. Design work included
roadway and freeway design, bridge structure design,
retaining wall design, traffic signal and ramp metering design, hydrology and hydraulic analysis, storm water
quality assessment, utility relocation coordination, right of way engineering, and field survey. The project includes a new Type L-9 interchange that will provide full access to SR 60 at Potrero Boulevard. Potrero Boulevard will be a six-lane facility between Willow Springs Parkway and
Western Knolls Avenue. A local roadway (Western Knolls
Avenue) will be extended and realigned north to connect back to Potrero Boulevard.

SBCAG, US 101 HOV & REHABILITATION PROJECT, SANTA

BARBARA COUNTY
Structures engineer for the completion of the PS&E for this $300M HOV widening and pavement rehabilitation project
for US 101, from the Cabrillo Boulevard Interchange to the Padaro Lane Interchange, a total of 6 miles. We are
working with Caltrans, including coordinating with Caltrans staff preparing design for their adjacent segment and
Caltrans staff providing corridor-wide services such as geotechnical engineering and surveying. Project elements also include reconstruction of two interchanges with leftlane off-ramps, replacement of three bridges of FEMAregulated creeks, retaining walls along the sea cliff, sound walls, and pavement rehabilitation.

JOHN WAYNE AIRPORT LANDSIDE MAINTENANCE AND

REMEDIATION PROJECT, ORANGE COUNTY
Structural engineer providing design support for John
Wayne Airport (JWA) for the development of design and
construction documents for multiple landside projects as part of JWA’s asset management program. Scope of
services included the visual inspection, assessment and evaluation of multiple bridge structures, document
concerns and/or issues and providing PS&E for the repair and rehabilitation recommendations.

BREA CANYON ROAD WIDENING, ORANGE COUNTY
Structures engineer responsible for the design of eight retaining walls and independent check of seven walls. Two walls are to be Caltrans Type 1 walls, one wall is to be an MSE wall, two walls are to be soldier pile walls, two walls are to be soldier pile walls with ground anchors and secant piles, one wall is to be an isolated soldier pile wall, and seven walls are to be soil nail walls. The soldier pile walls with ground anchors and secant piles used the secant piles to reduce required excavation depths during construction to place bottom of wall at required depths to meet
scouring of the adjacent creek channel. The soldier pile wall with isolation casing utilized the casing to prevent increased loading on an adjacent existing sheet pile wall.

The soil nail walls range in height up to 35 feet and in length up to 800 feet. Close coordination was required
with the replacement of bridge structures along the
widening where tall soldier pile walls meet up with the bridge abutments.

JASON HICKEY, SE

STRUCTURES LEAD

EDUCATION
Training in Bridge Inspector Training, National Highway Institute (NHI) Training in LRFD Bridge Design Course, University of California, Davis BS in Civil Engineering, California State University, Chico

REGISTRATION
CA SE S5783 | CA PE C72409
Leadership in Energy and Environmental Design (LEED)
National Bridge Inventory (NBI) Certificate - Safety Inspection of In-Service Bridges Jason has 21 years of experience in the analysis, design and preparation of PS&E packages for bridge and retaining wall projects.

He has been responsible for all aspects of structures project development, from preparing advance planning studies, retrofit strategy reports, and type selection reports during preliminary engineering to the preparation of PS&E production documents to shop drawing reviews and field investigations during construction. Jason's project experience also includes structure inspections, evaluation of existing and damaged structures, design of repairs and strengthening. These projects have included vehicular bridges, pedestrian bridges, entry monuments, shade structures, flag poles and sign structures, residential and commercial buildings, box culverts, concrete and steel storage tanks and water/wastewater treatment structures.

REPRESENTATIVE PROJECTS

Page 165 of 248 ends

15.F.

Page 669 of 1050 ends

24 City of Hemet
Warren Road Improvements

CANNON STREET WIDENING, ORANGE
Structural engineer providing professional and technical engineering services to improve the level of service along Cannon Street by widening to provide an additional
northbound lane between Santiago Canyon Road and
Serrano Avenue. The widening will be along the westerly side of the street and would require the widening of the existing bridge over Santiago Creek. The City is leading the civil and roadway design efforts, in addition to preparing the Water Quality Management Plan (WQMP) and
coordination with the utility companies and the City of Villa Park, while Mark Thomas is leading the environmental clearance, bridge widening, traffic engineering and
landscape architecture efforts while providing overall
support services for survey, geotechnical, hydrology &
hydraulic analysis and right-of-way engineering.

LA NOVIA BRIDGE WIDENING STUDY, SAN JUAN CAPISTRANO
Structures engineer for the preliminary study, performing the structural analysis, preparing the preliminary cost estimate for each phase from planning to construction and identification of funding sources for the replacement of this bridge. The project includes improvements to the
existing La Novia Avenue bridge that spans San Juan
Creek. The existing two-lane bridge will be demolished in phases and replaced with a four-lane facility. The new
bridge will include a three-span bridge that will be
approximately 260 feet long and 84 feet wide. In addition, to the four travel lanes, the bridge will also include a pedestrian lane and an equestrian lane that will be
physically separated from the travel lanes.

NUEVO ROAD BRIDGE REHABILITATION, RIVERSIDE COUNTY
Structures engineer for the replacement of the existing Nuevo Road Bridge over San Jacinto River. The existing
two-lane bridge will be replaced with a four-lane structure accommodating the future build out of Nuevo Road. The
approach roadway will taper from the new wider structure to the existing two-lane roadway. Primarily funded by HBP funds, the project will follow the process and procedures under the Caltrans Office of Local Programs.

YORBA LINDA BOULEVARD WIDENING AND SAVI RANCH

PARKWAY WIDENING PROJECTS, YORBA LINDA
Structural engineer providing final design services for the widening of Yorba Linda Boulevard and Savi Ranch
Parkway that includes the bridge widening over the Santa Ana River. Scope of work includes PS&E for both as well as leading the efforts on regulatory permitting processes.

OC LOOP SEGMENTS O, P, AND Q, ORANGE COUNTY
Structures lead for this project to bridge the 2.7-mile gap in the existing Coyote Creek Bikeway to provide safe, offroad bikeway connections that is west to the beach, north to Santa Fe Springs and east to La Habra. Segment O has grade separated crossings at Valley View Avenue and
Artesia Boulevard; Segment P has grade separated
crossings at Firestone Boulevard, I-5 and the rail tracks; and Segment Q has grade separated crossings at both rail tracks and Stage Road. It will connect the adjacent
neighborhoods to work, school and regional amenities
while providing safe crossings of freeways, waterways, and arterial roadways.

LYNN ODGIIV, SE

STRUCTURES/BRIDGES

EDUCATION
MS in Structural Engineering, Illinois Institute of Technology BS in Civil Engineering, Arizona State University

REGISTRATION
CA SE 6838 | CA PE 86869
Lynn has 18 years of experience in bridge structural engineering for transportation structures with an emphasis in the analysis, design, and inspection of highway bridges, earth retaining structures, and other structures. She has been responsible for leading and managing bridge-specific projects of various sizes, from small rehabilitation work with local agencies to large full segment structures with Caltrans and OCTA, overseeing the design and analysis calculations of bridge structures, preparing construction plan, specifications, quantities, and cost estimates, and various bridge type selection reports.

REPRESENTATIVE PROJECTS

Page 166 of 248 ends

15.F.

Page 670 of 1050 ends

25 City of Hemet
Warren Road Improvements

SHAUN (VINNY) CHAVEZ
SR. RAILROAD SYSTEMS TECHNOLOGIST III

EDUCATION
Signal Certificate (BNSF)
Johnston Community
College

REFERENCES
Jerry Bennett
Mass Electric Company
1925 Wright Street
La Verne, CA 91750
(562) 244 7919
William Maines
BNSF Railway
888 East Carnegie Drive
San Bernardino, CA 92408
(909) 269-2959 Cell

EMPLOYMENT

HISTORY
Pacific Railway
Enterprises, Inc.
09/2009 – present
BNSF Railway
10/2003-09/2009
Shaun "Vinny" Chavez has 21 years' experience in the railroad signal industry. Mr. Chavez has led the signal design on Automatic Highway Warning Systems (AHWS), design efforts to implement the new federal Positive Train Control (PTC) requirements. This work includes new control point designs based upon microprocessors, design modifications to existing relay-based systems and technology associated with AHWS systems. Mr. Chavez fakes the design from concept and survey plans and fully designs the signaling system in detail including developing detailed parts and material lists and creating final as-in-service plans.

REPRESENTATIVE PROJECTS INCLUDE:

Mid-Region Council of Governments - NMRX 54 Crossing Refresh Project: Served as a Senior Systems Technologist III and project manager, leading upgrades to 54 crossing locations. The upgrades consisted of upgrading old constant warning devices with new XP4 warning devices. Project Timeframe: 1/2024 – Current Austin Capital Metro - State of Good Repairs: Served as a Senior Systems Technologist II and project manager, leading upgrades to 20 crossing locations. The upgrades consisted of upgrading old constant warning devices with new XP4 warning devices. In addition, developing site specific application software for each location.

Project Timeframe: 12/2020 – 12/2024

Mid-Region Council of Governments - Tiger IX CTC: Served as a Senior Systems Technologist II and project manager, leading upgrades to the 26-mile corridor to the New Mexico Rail Runner service. The design process dealt with different tasks which are listed below.
• Upgraded existing wayside locations with new Electrologix Vital Controllers. • Designed all new wayside locations.
• Reconfigured existing crossing applications.
• Developed application software for all intermediates and control points. • Coordination changes to dispatch system and handshake logic with BNSF Railway.

Project Timeframe: 10/2020 – 06/2023
Foothill Goldline Phase 2B , Pomona, CA: Served as a Senior Systems Technologist II and project manager, leading the extension of the Phase 2A Project. This project consists of upgrading the Pasadena Subdivision wayside and crossing systems to accommodate the new adjacent light rail service. The design process dealt with different tasks which are listed below.
• Created new aspect charts for in service testing.
• Designed 27 new crossings with XP4.
• Designed 5 new wayside locations with IXS.
• Developed application software for all new locations. • Developed material lists for all locations.

Timeframe: 06/2019 – Present
Redlands Passenger Rail Project (RPRP), Redlands, CA: Served as a Senior Systems Technologist II and project manager, leading the brand new 10-mile corridor and extension of the Downtown Passenger Rail Project (First Mile). This project consists of three different types of operations which includes passenger, freight and light rail. The system is being designed with vital fiber wayside and crossing links to communicate point to point with a separate redundant ring in the case of a fiber strike. It has 26 at grade crossings and 8 control points. This project is currently in construction. Project Timeframe:
03/2016 – 06/2019
NCTD-PTC WIU Design & Installation Project: Served as a Senior Systems Technologist

Page 167 of 248 ends

15.F.

Page 671 of 1050 ends

26 City of Hemet
Warren Road Improvements
Shaun V. Chavez
I, supporting the programming and design of NCTD (North County Transit District) implementation of PTC throughout their system. As one of the project programmers, my efforts were to develop PTC mapping files for various locations throughout the system, as well as update signal plans, to support PTC enhancements. This project is currently ongoing.

Blitz Projects, BNSF Railway, and Bakersfield Subdivision, Bakersfield, CA: Served as Signal Maintainer for Blitz projects on BNSF mainline from Bakersfield to Richmond.

Duties included crossing protection, signal system integrity protection, FRA tests and troubleshooting. Project Timeframe: 01/2005 – 03/2005
Cajon Triple Track Project, BNSF Railway, Cajon Subdivision, Cajon, CA: Served as a Signalman in the triple track project from CP Keenbrook to CP Summit on the BNSF Cajon Subdivision responsible for pre-testing of all shop wired signal appliances, field tests; i.e., switch break down, track circuit setup, lamp downgrades, ramp testing and both pre and post cutover testing. Project Timeframe: 08/2006 – 12/2008 North Start Commuter Project, BNSF Railway, Minneapolis, MN: Served as foreman responsible for signal construction on the North Star Project in Minneapolis, MN. Duties included installation and upgrade of signal equipment, pre-testing and cutovers at various locations. Project Timeframe: 12/2008 – 08/2009
CP Mole Crossovers Project, Port of Long Beach/Parsons, Long Beach, CA: Served as Signal Engineer designing and researching new upgrades to CP LAXT and CP Mole.

Upgrades included changing dwarf signals to high signals, cantilevers and/or bridge signals where clearance permitted, design for placement of foundations for dwarf signals, high signals, cantilevers, and/or signal bridges.

CP Ocean Track Realignment Project, Port of Long Beach/Jacobs, Long Beach, CA: Served as Signal Engineer for design at CP Ocean related to track modifications. Design included modifications to the existing CP Ocean house, ensuring that if at all possible installation of new equipment would not affect reliability of existing equipment during construction.

Crossing Projects, BNSF Railway, Various Locations, United States: Served as a Signal Engineer II for BNSF crossing projects in various states throughout the BNSF system.

Projects include designs for installation of DTMF Activators for remote activation of crossings and full crossing installation including new house and crossing warning devices, Duties included design and material list generation. Project Timeframe: 09/2009 – 10/2010
California Division (Cajon Subdivision) PTC Integration: Served as a Signal Engineer II, for the Cajon Subdivision, leading the integration of new PTC equipment on the Cajon Subdivision which spans 81miles on the Transcon which involved adding new battery busses to support the newly developed IMG-2(WIU) and 220 Hz PTC radio, as well as designing in new GPS and PTC antennas. The Cajon subdivision was divided into five phases preparing the construction forces with suitable cut-over limits. There were various control points and intermediates in this subdivision that we completely revamped from old relay-based systems to having new equipment as well as new vital microprocessors.

The design process was extensive, but with our vast knowledge, we provided a team that accomplished all different aspects listed below.
• Created material lists for all locations affected within the subdivision. • Designed 7 new control points and 9 new intermediate signals with integrated PTC as well as solar/wind generator.
• Designed 25 Locations (CP/Int.) with PTC upgrades.
• Provided the BNSF with aspect charts spanning all 5 phases. • Developed custom programs, as well provide on call programming cut-over support.

Page 168 of 248 ends

15.F.

Page 672 of 1050 ends

27 City of Hemet
Warren Road Improvements

KENNETH CLARK

SENIOR RAILROAD SYSTEMS TECHNOLOGIST II
Kenneth (Ken) Clark has over fourteen (14) years of experience working within the railroad signal industry. He has held positions in maintenance, construction, engineering, and management during his railroad career.

Ken has utilized this experience to successfully contribute to projects of all sizes and varying levels of complexity. He has always, without fail, safely delivered projects for various owners, consistently on time and always under budget.

A large portion of Ken’s experience has been in signal maintenance on both the Union Pacific Railroad and Metrolink. During that time, he developed an innate understanding of signal system rehabilitation requirements, becoming an expert on a wide variety of signal equipment lifecycles and the requirements necessary for safely perform system upgrades. Ken’s responsibilities included testing and construction of wayside signals, crossings, PTC, and stand-by power. He has a complete understanding of commuter rail system regulatory requirements and is well versed on Metrolink signal standards and design criterion.

REPRESENTATIVE PROJECTS INCLUDE:

SCRRA – Wireless Crossing Nearside Station Stop Upgrades: The WCNSS system alleviates the nuisance crossing warning system activations due to commuter trains stopping at adjacent passenger stations. Ken performed operational QA/QC checks on the system design at each location to be upgraded with the WCNSS system. The WCNSS system encompasses signal, PTC, communication and fiber optic systems that are all vital in the WCNSS operation. Timeframe 3/2023 - Present NCTD – San Dieguito Double Track – The project extends the double track from CP Valley to CP Del Mar on the San Diego subdivision. The project encompasses new designs for signal, crossing, PTC, communication and fiber optic systems. Ken’s task for the project is to provide independent operational design review and manage the PRE QA/QC process. Reviewing the civil design and ensuring the systems design is accurate is a crucial aspect of the QA/QC process.

Timeframe 9/2024 – Present
NMRX – Crossing Refresh Project: The project upgrades 24 HXP-3 predictors to state-of-the-art XP4 predictors. Ken implemented PRE’s QA/QC process at all locations to provide a detailed review of all circuits affected by the design including the existing infrastructure.

Timeframe 6/2024 – Present
ACTA – Systems Modernization Program: This project upgrades obsolete equipment with state-of-the-art ElectrologIXS logic controllers. The

EDUCATION
Union Pacific Railroad,
Signalman Training
Courses

REFERENCES
Robert Flaherty
Herzog
Signal Supervisor
9130 Anaheim Place,
Ste: 230
Rancho Cucamonga,
CA 91730
661/666-7955
Casey Spencer
Herzog
Signal Inspector
9130 Anaheim Place,
Ste: 230
Rancho Cucamonga,
CA 91730
626/422-5477
Paul Goforth
Mass Electric
Construction Company
Signal Superintendent
9021 Rancho Park Ct.

Rancho Cucamonga,
CA 91730
562/205-7055

EMPLOYMENT

HISTORY
Pacific Railway
Enterprises, Inc.:
8/2021 – present
Mass Electric
Construction Company:
8/2016 – 8/2021
Union Pacific Railroad:
7/2010 – 8/2016

Page 169 of 248 ends

15.F.

Page 673 of 1050 ends

28 City of Hemet
Warren Road Improvements
Kenneth Clark

Page 2 ends

project also required designing vital fiber optic communication links between main and remote locations. Ken performed QA/QC checks on the system design at each location to be upgraded.

Timeframe 5/2024 - Present
SCRRA – Los Angeles Union Station Track & Signal Modernization: This project upgrades the signal system and improves the efficiency of train operations at Metrolink’s most critical hub. Ken performed vital signal program safety checks by rack testing control points in PRE’s signal lab.

Performing these checks and tests are extremely important to ensure that signal system cut-overs are executed efficiently. Timeframe:
3/2023 – Present
SCRRA – Lone Hill to White Double Track: The project will extend a second main track from CP White to Lone Hill Avenue on the Metrolink San Gabriel Subdivision. The project upgrades two control points, and twelve crossings that will result in improved operational efficiency on the Metrolink system. Ken performed signal system design review and QA/QC checks throughout the design process. Ken advised PRE personnel on ways to improve the signal systems design, which will lead to the best final product for Metrolink and the ridership.

Timeframe: 1/2023 – Present
SCRRA – Brighton to Roxford Double Track: The Brighton to Roxford Double Track Project includes approximately 12 miles of signal, crossing and track improvements on the Metrolink Valley Subdivision. Ken has overseen aspects of the signal design and performed QA/QC checks to ensure the quality of the signal system design.

Timeframe: 8/2022 – Present
SCRRA – SCORE Program Systems Engineering: The Metrolink SCORE program will add infrastructure to the overall Metrolink system to facilitate planned service increases. Ken has performed quality assurance checks for systems design and has contributed to the overall design configuration of the program. In his role as the Quality Manager, Ken directed PRE personnel in their design duties and performed feasibility and safety checks on the final design submittals. In addition, he assisted PRE staff with identifying program changes that improved the project’s overall operational efficiencies. Timeframe: 8/2021 – Present SCRRA – Anaheim Canyon Second Platform Project: The Anaheim Canyon Second Platform Project will introduce an additional platform and siding track on SCRRA’s Olive Subdivision. This much needed infrastructure improvement will allow bi-directional passenger operations in this area for the first time in Metrolink’s history. System improvements include the introduction of two new end of siding control points, various crossing system improvements and installing a new customer information system on the new passenger platform.

Page 170 of 248 ends

15.F.

Page 674 of 1050 ends

29 City of Hemet
Warren Road Improvements

C U R T I S B I B O L E T, S R / W A ,

R/W-AMC

UTILITY COORDINATION MANAGER
As a certified right-of-way professional, Curtis possesses an abundance of real estate transaction, utility relocation, and property management expertise. He has over 14 years of experience managing best practices, regulatory procedures, and logistics for utility relocation and property management projects on behalf of public agencies.

With his friendly demeanor, Curtis provides oversight and quality review for Monument agents. He is focused on maximizing revenue, clearing encroachments, and mitigating utility conflicts for his clients.

SANTA ANA RIVER TRAIL (SART) PHASE 2
Riverside County Transportation Commission | Corona, CA SART will cover a 12.8-mile section along the Santa Ana River Trail connecting Orange, Riverside and San Bernardino Counties. This Phase is the most westerly portion of the project adjacent to Green River Golf Course and the project will have to cross the rail. The utility companies within the project location are ATT, City of Corona, Level 3 Communication, Metropolitan Water District, Santa Ana Watershed, Southern California Edison, Southern California Gas, and Sprint.

Curtis is the Utility Coordination Manager which includes the relocation of electric, cable, gas, and waterline facilities. He is coordinating with affected agencies and utility owners to obtain permits, approvals, and necessary agreements for relocation, maintained files documenting relocations and communications with the utilities involved, and participated in meetings with RCTC and the design team to provide status updates.

WESTERN COACHELLA VALLEY FLOOD/BLOWSAND ROAD IMPROVEMENT, INDIAN

CANYON DRIVE
Coachella Valley Association of Governments | Palm Springs, CA This road improvement project is part of a initiative to mitigate roadway closures due to seasonal flooding and blowsand in the area. As utility Coordination Manager, Curtis is overseeing utility identification, potholing, and necessary utility relocation of utilities including sewer, fiber, and gas for this project.

LA CADENA OVER SANTA ANA RIVER BRIDGE REPLACEMENT PROJECT City of Colton | Colton, CA
This public improvement Project replaces the existing La Cadena bridge over Santa Ana River to accommodate four travel lanes, a raised median, bike lane, and a sidewalk in each direction.

Curtis is the Utility Coordination Manager which includes the relocation of electric, cable, gas, and waterline facilities before construction and will obtain Caltrans Certification.

RAMON ROAD WIDENING
Cities of Palm Springs and Cathedral City | Palm Springs and Cathedral City, CA This project entails the widening of Ramon Road between Palm Springs and Cathedral City from 4 lanes to 6 lanes. It included 25 potholes belonging to 11 utilities and funded by the Federal Highway Bridge Program and adheres to the Uniform Act. As Utility Coordination Manager, Curtis oversaw the protection, removal and relocation of utility facilities necessary to clear and certify Right-of-way with Caltrans.
2ND STREET BRIDGE
City of Long Beach | Long Beach
The 2nd Street Bridge over Marine Stadium was originally constructed in 1955 and seismically retrofitted in 1995. This Project will replace the entire bridge deck in conformance with the current Caltrans design specifications. Curtis is the Utilities Coordination Project Manager for Phase I of this project providing Utility Location Determination and Utility Notifications. Phase I of the project involved identifying utilities in the area and obtaining as-built plans and inventory PROJECT EXPERIENCE 15 YEARS EXPERIENCE

BACHELORS DEGREE
Communications Studies,
Minor in Business, University
of Idaho

EDUCATION

SENIOR RIGHT-OF-WAY AGENT
International Right-of-Way Association

RIGHT-OF-WAY ASSET

MANAGEMENT
International Right-of-Way Association

REAL ESTATE SALESMAN
State of California
CA#02008725

LICENSES
IRWA
International Right-of-Way
Association
WTS
Women’s Transportation
Seminar

AFFILIATIONS
Curtis is a boating enthusiast
even though his acronym for
BOAT means “Bust Out Another
Thousand.” He is exceptional at
producing large crawfish boils
and his favorite food is creole.

He played football in college and
married his college sweetheart.

FUN FACT!

Page 171 of 248 ends

15.F.

Page 675 of 1050 ends

30 City of Hemet
Warren Road Improvements
maps from the utility owners to identify all utility location, followed by Utility notification, including meeting with utility owners,reviewing facilities with the design team, identifying conflicts, and preparing Relocation Claim Letters and Notices to owner to relocate, and filing final close out with the city.

PERRIS VALLEY LINE RAIL EXTENSION PROJECT
Riverside County Transportation Commission | Riverside and Perris, CA This project extended the Metrolink 91 Line commuter rail service 24 miles to link service to Perris. The extension involved track shared with freight rail and other segments with new double track siding. Curtis coordinated 162 potholes, drafted utility agreements, and gathered data from the cities of Perris, and major utilities including SoCal Gas Company, Kinder Morgan, Questar, Metropolitan Water District of Southern California, Eastern Municipal Water District, and Western Municipal Water District. Curtis’ tasks included preparing a utility matrix, determining liability by analyzing superior rights, preparing reports of investigations, notices to owners, and drafting utility agreements.

PLANS, SPECIFICATIONS & ESTIMATES (PS&E) SR-60/POTRERO BOULEVARD NEW INTERCHANGE PHASE 1
City of Beaumont | Beaumont, CA
The project provides the City of Beaumont with a full access interchange at Potrero Boulevard and SR-60 designed to mitigate increasing traffic volumes and implement the circulation element of the City ‘s General Plan. Mid-way through the project, the City sought utility services of Curtis to assist with right of way utility relocations. Curtis coordinated all utility relocations and met strict deadlines in order to secure the City’s $8 million federal funding. Curtis prepared and obtained approval for Caltrans District 8 right of way certification for phase 1.

PA&ED AND PS&E AUTO CENTER BRIDGE/CASINO DRIVE BRIDGE SEISMIC

REHABILITATION
City of Lake Elsinore | Lake Elsinore, CA
The project will strengthen and widen the bridge to add a sidewalk on East Side of the bridge. Curtis provided utility research, cost estimation, collection of as-builts, and initial coordination with utility companies to protect and relocate their facilities in this bridge rehabilitation project.

AVENUE 50 AND JACKSON STREET INTERSECTION IMPROVEMENTS
City of Indio | Indio, CA
The City of Indio us improving the intersection of avenue 50 and Jackson Street and widening the two streets, eliminating the stop signs and adding traffic signals. As Utility Relocation and Coordination Lead, Curtis identified 12 individual utility facilities that would be impacted by the project during the planning phase of the project.

NORTH FIRST AVENUE BRIDGE REPLACEMENT OVER BNSF RAIL YARD City of Barstow | Barstow, CA
Utilizing Caltrans Highway Bridge funds, the City is replacing the bridge to correct structural deficiencies. As the Utility Manager, Curtis provided utility coordination services for 28 utility conflicts in the original design and ultimately coordinated relocations for 11 facilities.

Utilities affected included City of Barstow sewer, Golden State Water, Southwest Gas, Southern California Edison, Spectrum, and Frontier. Curtis provided cost estimates for the utility relocations for the Caltrans Right of Way Data Sheet and certification package.

PS&E TEMESCAL CANYON BRIDGE OVER TEMESCAL WASH REPLACEMENT PROJECT City of Lake Elsinore | Lake Elsinore, CA
Curtis and his team completed the requisite Caltrans Right of Way Data Sheet to estimate utility relocation costs and clear the project for constructing the proposed improvements to landscape along the I-215 corridor in San Bernardino.

ENVIRONMENTAL AND FINAL DESIGN PHASE FOR CALLE CONTENTO/RANCHO CALIFORNIA ROAD ROUNDABOUT PROJECT Riverside County Transportation Department | Temecula Valley, CA The Temecula Valley Wine Country Community Plan adopted by the Riverside County Board of Supervisors planned for the implementation of roundabouts at five intersections across four miles of Rancho California Road between Butterfield Stage Road and Glenoaks Road.

Curtis provided turnkey utility coordinator services as the subconsultant to the design engineer. Curtis collected as-built plan, created a utility conflict matrix, reviewed utility exhibits, and drafted license agreements. In the absence of a Construction Manager for this project, as Utility Coordinator, Curtis was engaged during construction phase and coordinating with the contractor and affected utility agencies CURTIS’ PROJECT EXPERIENCE CONTINUED

STRONG RELATIONSHIPS

WITH ALL STATE UTILITY

COMPANIES

EXPERIENCED IN MAJOR

TRANSPORTATION

PROJECTS

DEDICATED MANAGER

WHO ENSURES PROJECT

SUCCESS

A CONSENSUS BUILDER

UTILITY RELOCATION
EXPERT
CURTIS

AT A GLANCE

Page 172 of 248 ends

15.F.

Page 676 of 1050 ends

31 City of Hemet
Warren Road Improvements
IFE Inland Foundation Engineering, Inc.

Inlandfoundation.com
1310 South Santa Fe Ave. PO Box 937 San Jacinto, CA 92581 ꓲ (951) 654-1555 77622 Country Club Dr. Suite Q, Palm Desert, CA 92211 ꓲ (760) 200-2400 Allen D. Evans, P.E.

Principal / Project Manager
Mr. Evans has more than 40 years of engineering and management experience. He has extensive experience in geotechnical engineering for transportation infrastructure projects and has managed several pavement and geotechnical engineering
investigations for projects like the Warren Road Improvements project. His recent pavement experience includes reconstruction of the Hemet Auto Mall streets, in addition to several miles of City of Hemet streets that have been reconstructed with SB1 funding. He has also managed geotechnical investigations for new bridge and bridge widening projects that have been designed and constructed with FHWA guidelines and Caltrans oversight.

Relevant Project Experience:
• City of Hemet, CIP 2406, SB 1 Pavement Rehabilitation • City of Hemet, CIP 2407, SB 1 Pavement Rehabilitation • City of Hemet, CIP 5690, SB 1 Pavement Rehabilitation • City of Hemet, CIP 5755, SB 1 Pavement Rehabilitation • City of Hemet, CIP 5765, SB 1 Pavement Rehabilitation • City of Hemet, Kirby Street Pavement Rehabilitation
• City of Hemet, Hemet Auto Mall Pavement Rehabilitation • City of San Jacinto State Street Pavement Rehabilitation • City of Lake Elsinore, La Laguna RV Park and Boat Launch • City of Lake Elsinore, Rosetta Canyon Park
• City of Indian Wells, Bicycle and Pedestrian Bridge at Deep Canyon Channel • City of Menifee, Peacock Neighborhood Street Evaluation and Rehabilitation Projects • City of Moreno Valley, Cycle 6 ADA Pedestrian Ramp Improvements • City of Rancho Mirage, Gerald Ford and Bob Hope Drive Improvements • City of San Jacinto, State Street Improvements
• City of San Jacinto, Mountain Avenue Evaluation and Pavement Rehabilitation Projects • City of Perris, Citywide Pavement Evaluation and Pavement Rehabilitation Projects • City of Perris, Old Nuevo Road Evaluation and Pavement Rehabilitation Projects • City of Beaumont, Potrero Boulevard Interchange
• BNSF, Third Main Line, San Gabriel River Crossing, Santa Fe Springs, California • SBCTA, Interstate 215 Segments 1 & 2, San Bernardino, California • Riverside County Transportation Commission, Cactus Avenue Bridge Widening, Riverside County, California
• SBCTA, Colton Crossing, Colton, California
Experience
40 + Years
Education:
- B.S. Agricultural Engineering,
University of Idaho, Moscow,
Idaho
- M.S. Civil Engineering,
University of Southern
California, Los Angeles,
California
Professional Registrations:
- CA Geotechnical Engineer,
No. 2060
- CA Civil Engineer, No. 38104
Associations:
- American Society of Civil
Engineers
- California Geotechnical
Engineers Association
- American Council of
Engineering Companies

Page 173 of 248 ends

15.F.

Page 677 of 1050 ends

32 City of Hemet
Warren Road Improvements

Shawn Ariannia, Ph.D., PE, GE | Principal Geotechnical
Engineer

Dr. Ariannia has over 38 years of experience in the design, supervision, and technical management of transportation, transit, and different types of public projects in structural and geotechnical fields. During the last two decades, he has performed geotechnical engineering services for various types of projects in Southern California including
highway/transportation, PA/ED and PS&E studies for
Caltrans/Los Angeles County Metropolitan Transportation Authority (LA Metro) highway projects, bridges, parking structures, aviation, ports, educational facilities, and numerous CIP/pavement and vertical/building projects for various cities and municipalities.

Dr. Ariannia has extensive experience in LA Metro Highway Program PA/ED and PS&E projects and a vast knowledge of Caltrans regulations related to highway design. He has
supervised complex and large transportation geotechnical engineering projects.

Relevant Experience
 Geotechnical Services for G-Line BRT, LA Metro,
San Fernando Valley, CA
 Geotechnical Services for I-105 ExpressLanes
Segment 1 for PS&E Phase, LA Metro, Los Angeles
County, CA
 Geotechnical Services for PA/ED and PS&E of SR91 from Central Avenue to Acacia Court Improvement Project, LA Metro, Compton, CA
 Geotechnical Services for PA/ED and PS&E for SR91 from Atlantic Avenue to Cherry Avenue Improvement Project, LA Metro, Long Beach, CA
 Geotechnical Services for Lynwood Intersection
Improvements PS&E, LA Metro, Lynwood, CA
 Geotechnical Services for Willow Street Corridor
Project, LA Metro, Long Beach, CA
 Pavement Engineering for Intermodal Transportation
Facility West (ITF West) Landside Access
Modernization Program Automated People Mover
(APM) Project, LAWA/LAX, Los Angeles, CA
 Geotechnical Investigation for PS&E for SR-57/SR60 Confluence Project, LA Metro, Los Angeles County, CA
Education
 Ph.D., Geotechnical
Engineering, University of
California, Los Angeles
(UCLA)
 M.S., Civil Engineering,
University of Tehran
 B.S., Civil Engineering,
University of Tehran
Registrations/Certifications/
Affiliations
 Registered Geotechnical
Engineer: California, #2824
 Professional Civil Engineer:

California, #65642
 Asphalt Mix Design
Certification, Asphalt Institute
 Former Member of National
Science Review Panel, US
 Past President, ASCE Inland
Empire Geotechnical
Committee
 Member of Cal Poly Pomona
Industry Advisory Committee
Areas of Expertise
 38+ years of experience in
Civil engineering and
geotechnical engineering
projects for public and private
clients
 Saved hundreds of thousands
of dollars for clients by
providing high quality yet
economic alternate
geotechnical value engineering
solutions
 High extent of familiarity with
all the educational local, state,
and federal laws and
regulations
 Vast knowledge and
experience in geotechnical
seismic rehabilitation study
and site specific evaluations
 Extensive experience in
Pavement design, retrofit and
management projects with
various cities in Southern
California
 Geotechnical engineering for
various transportation, bridge,
parking structures and
commercial buildings

Page 174 of 248 ends

15.F.

Page 678 of 1050 ends

33 City of Hemet
Warren Road Improvements
Ken Perez Sr. IES
Experience
20 years of field experience as
an electrician installing lighting
and power systems.
26 years engineering design
experience in the consulting
electrical engineering field
• UCSD-1998, HVAC, DDC
Controls Certification
• Mesa College-1978, National
Electrical Code
• On-going classes in lighting
fundamental, applications,
Title-24 and UBC, NEC, CEC
etcetera.

Professional Affiliation
BIA: Member
IES: Member
Ken Perez Sr. has been in the electrical field for more than 40 years with experience in both construction as well as electrical engineering design. For the last 30 years, he has been working on the engineering side of the industry with an emphasis in lighting design. His actual field experience has given him a tremendous edge over his competition
in that he knows firsthand HOW an electrical system is
installed, which he is then able to more clearly translate this to the design documents. This approach has enabled him
to keep costly change orders down to a minimum for his
client’s benefit. He has continued his knowledge in lighting fundamentals and electrical engineering by staying active with on-going classes in his field of expertise. These classes include Lighting Fundamentals through the IESNA and state sponsored classes for Energy Conservation Measures.

Ken’s experience has caught the attention of many
municipal agencies and has been called upon to offer expert advice on lighting ordinances as well as lighting design guide criteria.

President Visual Concepts Lighting
Roripaugh Sports Park| Temecula, CA
Project Organization
& Key Personnel

Page 175 of 248 ends

15.F.

Page 679 of 1050 ends

34 City of Hemet
Warren Road Improvements
DEREK C. HOOD, PLS
California Professional Land Surveyor #6799
President / Principal of Inland Aerial Surveys, Inc.

Mr. Hood began his Land Surveying career in 1979. He has worked on projects for both the public and private sectors. In 2000, Mr. Hood became Principal and President of Inland Aerial Surveys, Inc. and during this time has been managing the company operations. Inland Aerial Surveys, Inc. provides aerial photogrammetry services. Some of Mr. Hood’s Past experience has included, Survey Party Chief, Survey Dept. Management, Photogrammetic map compilation and Aerial Camera Operator.

Project Experience
EMWD Strip Maps - Kitching St and Heacock St , Moreno Valley Ca.

Provided Aerial Photogrammetry Services consisting of the following:

Acquired Aerial Imagery
Compiled approx. 8,100 lf of 150’ wide strip mapping 1” =40’ with 1’ contours.

Project deliverables: A digital Topographic Map, which included a Digital Terrain Model and digital files of the aerial imagery
Mapping Data delivered in AutoCAD .DWG format
The project was performed for Cozad & Fox.

CVWD Ave 42 Bermuda Dunes CA
Provided Aerial Photogrammetry Services consisting of the following:

Acquired Aerial Imagery
Compiled approx. 10,800 lf of 150’ wide strip mapping 1” =40’ with 1’ contours.

Project deliverables: A digital Topographic Map, which included a Digital Terrain Model and digital files of the aerial imagery
Mapping Data delivered in AutoCAD .DWG format
The project was performed for Krieger & Stewart, Inc.

Cajalco Rd. Riverside County CA
Provided Aerial Photogrammetry Services consisting of the following:

Acquired Aerial Imagery and LIDAR
Compiled over 800 acres of mapping at 1” =40’ with 1’ contours for design purposes for an approx. 5.3 mile stretch of Cajalco Rd.

Project deliverables: A digital Topographic Map, which included a Digital Terrain Model (DTM) and a high resolution digital orthophoto.

LIDAR was utilized in the creation of the DTM
Mapping Data delivered in MicroStation format
The project was performed for Riverside County, Transportation Dept.

Page 176 of 248 ends

15.F.

Page 680 of 1050 ends

35 City of Hemet
Warren Road Improvements
Ultra
Engineering
Contractors,
Inc.

John
West

36806
Pebley
Ct

Winchester,
CA
92596

General
Engineering
Contractors
License:

960135 and 971768

Experience:

35 years
construction
management
with
15 years
dedicated
to

Subsurface
Utility
Engineering.

Certified
Utility
Locator
and
Ground

Penetrating
Radar
Operator.

Responsibilities for
past/related
services:

• Hiring
and
training
of
employees.
• Fourteen
years
of
in
the
field
air/vacuum
excavation
experience.
• Utility
locating,
layout
and
design.
• Project
coordination.
• Estimating.
• Equipment testing and inspections.
• Brand recognition and growth
• Purchasing.
• Scheduling.
• Customer acquisition and relations.

Contact:

John
West

Vice
President/RMO

Ultra
Engineering
Contractors,

Inc.
36806
Pebley
Ct

Winchester,
CA
92596

WBE/SBE
Cell
–
619.438.1213

Office
–
951.223.3552
Email- [email protected]
Website-­‐
www.DigWithAir.com

Page 177 of 248 ends

15.F.

Page 681 of 1050 ends

36 City of Hemet
Warren Road Improvements
Ultra
Engineering
Contractors,
Inc.

Jeremy Marginson
38296 Members Club Drive
Murrieta, CA 92563
Arizona State University
School of Business
B.S. Economics 1999
Experience:

16 years
construction
management
all
dedicated
to
Subsurface
Utility

Engineering.

Certified
Utility
Locator
and
Ground
Penetrating
Radar

Operator.

Responsibilities
for
past related
services:

• 16 years
of
in
the
field
air/vacuum
excavation
experience.
• Utility
locating,
layout
and
design.
• Project
management
and
coordination.
• Utility
documentation
inspection
and
processing.
• Estimating.
• Traffic
Control
design
and
permit
processing.
• Safety
training. EM-385, OSHA, Cal OSHA.
• Quality Control
• Delivering final reports.

Contact:

Jeremy Marginson
Project Manager
Ultra
Engineering
Contractors,
Inc.

36806
Pebley
Ct

Winchester,
CA
92596

Phone: 951-223-3552
Mobile: 858-414-4134
Email: [email protected]

Page 178 of 248 ends

15.F.

Page 682 of 1050 ends

37 City of Hemet
Warren Road Improvements
Sandipan Bhattacharjee, PE, TE, AICP, ENV SP PRINCIPAL
the transportation solutions company...

LICENSES/CERTIFICATIONS
American Institute of Certified Planners
(AICP): Membership Number 019936
Professional Engineer (Civil), California,
License Number C81872
Professional Engineer (Traffic), California,
License Number TR2847
ENV-SP, Certificate Number 23729

EDUCATION
University of Southern California (USC),
Master of Planning, 2003.

Indian Institute of Technology, Kharagpur,
India. Bachelor of Architecture (Honors), 2001.

EXPERTISE
Transportation Fee Programs
California Environmental Quality Act
National Environmental Policy Act
Asset Management
Envision & Sustainable Infrastructure
Global Climate Change Strategy
Transportation Planning & Modeling
Traffic Impact Assessment
Traffic Simulations
Site Access Analyses
Transit Oriented Development
Access Management and Site Design
Parking Studies
Roadway Widening and Realignment Studies
Campus Design and Non-Motorized Circulation

EXPERIENCE
Adjunct Faculty, Price School of Policy, Planning
& Development, USC, 2008–2016
Associate, LSA Associates, Inc., Riverside,
California, October 2003–January 2014.

Contract Planner, City of South Pasadena,
California, June 2002–October 2003.

PROFESSIONAL AFFILIATIONS
American Planning Association (APA)
Institute of Transportation Engineers (ITE)
Building Industry Association (BIA)
Sandipan is a Co-Founder and Principal at Translutions. His primary responsibilities are to prepare technical analyses of land development and transportation infrastructure projects, including comprehensive traffic impact analyses, traffic operations analyses, and parking studies. Sandipan has worked in the Southern California region for over fifteen years and has extensive experience in preparing traffic operations analyses for Caltrans and other MPOs. He is well versed in rules and regulations in the five-county SCAG region.

Sandipan has led teams preparing traffic studies and multimodal analyses for various types of projects. Sandipan has extensive experience in preparing defensible transportation analysis for inclusion in CEQA documents. Sandipan has worked with several jurisdictions to help prepare and/or review proposed guidelines and implementation of SB-743 requirements under CEQA.

REPRESENTATIVE PROJECTS
Colima Road Widening, Los Angeles County
Translutions prepared the VMT Analysis for the Colima Road Widening project. The analysis included running the SCAG Regional Transportation Plan (RTP) model to identify the projects impacts on VMT. As part of the project, Translutions worked with the Client to identify the appropriate area to determine impacts from the project as well as identified induced demand from the project. Translutions also provided future without and with project traffic volume forecasts for the area. Mr. Bhattacharjee is the Principal in Charge.

Jackson Street Widening
Translutions prepared the VMT analysis for the Jackson Street Widening Project in the City of Indio and Unincorporated Riverside County. The Jackson Street Improvement Project is proposing roadway and traffic signal improvements on Jackson Street from Odlum Drive (approximately 0.5 miles north of Avenue 50) to approximately 0.25 miles south of Avenue 52. The project also includes improvements on Avenue 50, Avenue 51, and Avenue 52 near Jackson Street. The project would widen the roadway to provide a second northbound through lane on Jackson Street, as well as dedicated left- and rightturn lanes at the intersections. The project is approximately 1.5 miles long and also adds a bike lane and sidewalk along the roadway. The initial assessment showed a CEQA impact under VMT. As a result, Translutions recommended feasible mitigation measures to reduce the impacts to less than significant.

Temescal Canyon Road Widening, County of Riverside
Translutions is working on the traffic operations analysis report for the Temescal Canyon Road Widening Project for the County of Riverside. The proposed project is in the El Cerrito area of the County of Riverside near the City of Corona. Translutions is preparing the traffic operations analysis as well as the VMT analysis for the project. For the analysis, several models including the RIVTAM, SCAG-RTP, City of Corona, as well as the RIVCOM were evaluated. The analyses are being conducted using the RIVCOM model.

The analysis included running the traffic model to identify the projects impacts on VMT.

As part of the project, Translutions worked with the Client to identify the appropriate area to determine impacts from the project as well as identified induced demand from the project. Translutions also provided future without and with project traffic volume forecasts for the area. Mr. Bhattacharjee is the Principal in Charge.

Gilman Springs Road Bridge, County of Riverside
Translutions is working on the traffic operations analysis report and the construction impact analysis for the Gilman Springs Bridge Project for the County of Riverside. The proposed project is in the El Cerrito area of the County of Riverside near the City of Corona. Translutions is preparing the traffic operations analysis as well as the VMT

Page 179 of 248 ends

15.F.

Page 683 of 1050 ends

38 City of Hemet
Warren Road Improvements
Sandipan Bhattacharjee, PE, TE, AICP, ENV SP

PRINCIPAL
REPRESENTATIVE PROJECTS (Continued)
2 analysis for the project. The County of Riverside in cooperation with Caltrans have determined that there is a significant need for bridge the transportation solutions company...
improvements on the existing Gilman Springs Road Bridge over Potrero Creek. The analyses are being conducted using the RIVCOM model. Mr. Bhattacharjee is the Principal in Charge.

Telegraph Road Bridge Widening, City of Pico Rivera
Translutions is working on the traffic operations analysis report, VMT analysis, and the construction impact analysis for the Telegraph Road Bridge Project in the City of Pico Rivera. The proposed project will widen the bridge over the Rio Hondo River. Translutions recommended strategies which would allow traffic operations to be minimally impacted during construction, a major deviation from the RFP where the recommendation was to reduce the number of lanes on the bridge during construction. The analyses are being conducted using the SCAG RTP model. Mr. Bhattacharjee is the Principal in Charge.

Shadow Mountain Road, Helendale area of San Bernardino County Translutions prepared on the traffic operations analysis for the proposed Shadow Mountain Road Grade Separation project from a traffic operations and vehicle miles traveled perspective. The project consists of constructing a 4-lane roadway to extend Shadow Mountain Road from Helendale Road, over the Mojave River, to National Trails Highway. The project also includes constructing a grade separation over the Burlington Northern Santa Fe (BNSF) railroad. The proposed project will provide better access for the community and railroad crossing safety benefits for the developing Helendale community. Reduced delays are also anticipated at the railroad crossing. The study objectives include (1) documentation of existing weekday AM and PM peak hour traffic conditions (including existing accident data in the vicinity of the site); (2) evaluation of weekday AM and PM peak hour traffic conditions for Interim Year (2020) conditions; (3) evaluation of weekday AM and PM peak hour traffic conditions for Long Range 2040 conditions; (4) evaluation of construction impacts for operations and VMT; and (4) evaluation of CEQA impacts under VMT. Mr. Bhattacharjee is the Principal in Charge.

I-10 8th Street Interchange
Translutions is working on the traffic operations analysis report for the I-10/8th Street interchange in the City of Banning. The analysis was based on the Riverside Transportation Analysis Model and the SCAG Regional Transportation Plan. Traffic operations at the study area intersections will be conducted using HCM 6th Edition for a multiple period analysis, which accounts for the carryover of unmet demand from one time period to the next during periods of oversaturation. The analysis was also used to identify residual queues in a previous period that persist to the start of an additional analysis period using SimTraffic software for multiple period analysis. A failure year analysis will also conducted to determine the last year at which the project would continue to operate at satisfactory levels of service and all queues would fit within the available storage lengths.

I-5 Utica Avenue
Translutions is working on the Intersection Control Evaluation (ICE) for the Utica Avenue and Interstate 5 located in unincorporated Kings County. The ICE analysis will be consistent with the procedures included in the Caltrans Traffic Operations Policy Directive 13-02 Intersection Control Evaluation (August 2013). The objective of the evaluation will be to identify access solution concepts that will meet the transportation purpose and need consistent with system performance goals, project context, and financial constraints. This assessment will include a planning-level capacity analysis to identify the preliminary size or footprint of each study area intersection.

SR-210 Alder Avenue Interchange, City of Rialto, San Bernardino County Translutions prepared the traffic operations analysis report for the SR-210/Alder Avenue in the City of Rialto. The analysis was based on the San Bernardino Transportation Analysis Model and the SCAG Regional Transportation Plan. Traffic operations at the study area intersections was conducted using HCM 6th Edition for a multiple period analysis, which accounts for the carryover of unmet demand from one time period to the next during periods of oversaturation. The analysis was also used to identify residual queues in a previous period that persist to the start of an additional analysis period. SimTraffic software used for the multiple period analysis since it captures the driver behavior and models the interaction of vehicles within a roadway network. A failure year analysis was also conducted to determine the last year at which the project would continue to operate at satisfactory levels of service and all queues would fit within the available storage lengths. A comparison of collision data within the project study are to statewide average collision rates on similar facilities was conducted using data provided by Caltrans for a three-year period. Mr. Bhattacharjee is the Principal in Charge.

Sierra Avenue Traffic Operations & Construction Impact Analysis, City of Fontana, San Bernardino County Translutions conducted a traffic operations analysis, construction impact analysis, for the Sierra Avenue Widening Project in the City of Fontana. The widening of Sierra Avenue would provide additional traffic capacity of meet future demands, as the current traffic volumes

Page 180 of 248 ends

15.F.

Page 684 of 1050 ends

39 City of Hemet
Warren Road Improvements
Sandipan Bhattacharjee, PE, TE, AICP, ENV SP

PRINCIPAL
REPRESENTATIVE PROJECTS (Continued)
3 are at, or exceed, the traffic capacity of the existing roadway. The project a the transportation solutions company...
lso included sidewalks and 5-foot-wide bicycle lanes that would improve connectivity within the community and encourage alternative modes of transportation. The project would add one additional travel lane in each direction for approximately 1 mile along Sierra Avenue between Foothill Boulevard and Baseline Avenue.

The width of each proposed travel lane would consist of 11 feet with a new 12-foot-wide raised landscaped median. Translutions evaluated the potential impacts of the median and identified locations for potential median breaks. The Construction Impact Analysis (CIA) included a construction staging area located on one of several vacant parcels located on the northern portion of the Project limits along Sierra Avenue. The CIA reduced the saturation flow rates from 1,800 to 1,600 vehicles per lane per hour, since lane narrowing, and construction conditions reduce capacity, based on research conducted by the Transportation Research Board. Mr. Bhattacharjee is the Principal in Charge.

Rancho Santa Margarita Bridge, City of Rancho Santa Margarita, Orange County Translutions is working with the City of Rancho Santa Margarita and assisting the Engineering Team on the Rancho Santa Margarita Bridge Hinge Replacement Project. Translutions will prepare a Construction Traffic Impact Analysis and Transportation Management Plan. This project is a Caltrans Local Assistance project. Translutions’ role in this project is to identify strategies to minimize impacts to automobile, pedestrian, and bicycle traffic as well as to the nature trails in the area during construction. Translutions is evaluating signal timing and unobtrusive strategies to keep traffic moving during construction. Mr. Bhattacharjee is the Principal in Charge.

North Haiwee Dam Construction Impact Analysis, Inyo County Translutions is working on the construction traffic impact analysis for the proposed North Haiwee Dam 2 Project for the Los Angeles Department of Water & Power. The project is located in the Owens Valley area of Inyo County. Translutions’ is helping LADWP identify self-mitigating strategies to minimize traffic impacts during construction of the project. In addition to evaluating impacts on roadway capacity, Translutions is also assisting is identifying effects on other transportation issues such as speed differentials, left turn stacking evaluation, sight distances, etc. Mr. Bhattacharjee is the Principal in Charge.

Water Replenishment District of Southern California Learning Center, City of Pico Rivera, Los Angeles County Translutions prepared the traffic impact analysis for the proposed Water Replenishment District of Southern California (WRD) Administrative Learning Center project. The proposed project is located in the City of Pico Rivera in Los Angeles County. WRD will construct the administrative learning center as part of the Groundwater Reliability Improvement Program Advanced Water Treatment Facility. The project would create an outreach facility for the public, local stakeholder groups and nearby educational facilities, where WRD can present information on recycled water treatment and daily operations. In addition, it would provide meeting and conference space for WRD, the City of Pico Rivera, and El Rancho Unified School District. Mr. Bhattacharjee was the Principal in Charge.

Pico Rivera Urban Greening Master Plan (Active Transportation), City of Pico Rivera, Los Angeles County The State Strategic Growth Council awarded the City of Pico Rivera for the Urban Greening Master Plan which will identify new sites for green spaces, develop a pedestrian and bicycle lane plan, develop a groundwater infiltration plan and create a unifying street tree canopy and water efficient plant palette. The project includes preparation of the plan as well as relevant CEQA documents. Translutions role in this project is in the identification of prospective bike lanes, preparing portions of the bicycle master plan, evaluating potential changes to mode split because of the plan, calculate potential VMT reductions because of the proposed plan, and preparation of the transportation/traffic section of the CEQA document. Mr. Bhattacharjee is the Principal in Charge.

Kruse Road Feasibility Study
The City of Pico Rivera: Kruse Road Feasibility Study and Development Plan is part of the SCAG Sustainability Planning Grant program.

Translutions is part of a multi-disciplinary team of consultants for this project. Translutions’ role is to evaluate traffic as well as pedestrian and bike operations and identify potential land use changes and their impacts on the transportation system. Mr. Bhattacharjee was the Principal in Charge.

Lytle Creek Roadway Sufficiency
Translutions prepared a sufficiency analysis for the proposed Lytle Creek Road in the City of Fontana. Lytle Creek Road is classified as a four-lane roadway in the City’s General Plan. Due to geometric constraints, right of way issues, and SCE towers, the four-lane classification wasn’t geometrically feasible. Translutions conducted an analysis and recommended intersection design strategies to lower traffic volumes on Lytle Creek Road to provide acceptable operations under year 2035. Mr. Bhattacharjee was the Principal in Charge.

Page 181 of 248 ends

15.F.

Page 685 of 1050 ends

40 City of Hemet
Warren Road Improvements

SUB-CONSULTANTS
Inland Foundation Engineering, Inc. - Geotechnical Engineering IFE will provide geotechnical engineering services as part of the WEBB Team for this project.

IFE has been a recognized leader in developing solutions for demanding geotechnical engineering for over 37 years. IFE was founded in 1978 to serve the needs of the private sector, local agencies, and school districts. IFE offers comprehensive geological and geotechnical engineering services for commercial, public works, schools, and private land development projects.

Mark Thomas - Bridge Engineering
Mark Thomas provides civil and structures engineering, construction management, surveying, urban design, and landscape architectural services that have set the stage for countless California roadways, structures, bicycle/pedestrian facilities, parks, communities, and flood control and utility systems. We strive to develop ideas and alternatives that other firms might not, and be a true partner with our clients – developing solutions that are supported by the community and decision makers, are context-sensitive, and are technically sound.

Visual Concepts Lighting, Inc. - Street Light
Visual Concepts Lighting, Inc. (VCL) will provide electrical engineering services for the City’s project. VCL specializes in the creation of outdoor “Lighting Portraits”. Not only do they provide expert advice as Lighting Consultants, but they also provide the engineering support for Design Documents. Their combined years of actual field experience and our knowledge of Municipal Lighting Ordinances and Codes has enabled them to stand out as an industry leader in the art of lighting. Their experience has won us the respect of many municipalities and we have been called upon by a number of agencies to assist in the rewriting of Municipal Lighting Ordinances and Design Guide Criteria.

Inland Aerial Surveys, Inc. (IAS) - Aerial Topography
IAS has been providing photogrammetry, aerial mapping, and geo-spatial services to a continually expanding number of clients in both the private and public sector.

IAS offers all photogrammetric services while specializing in the compilation of aerial topographic digital data. Through the use of technologically advanced precision equipment and capabilities, IAS has established a prominent reputation in the industry by providing an unequaled level of quality. An excellent reputation has been established by very close quality control of all phases of a project.

Ultra Engineering - Potholing
Ultra Engineering (USI) is the leading experienced underground utility location company in Southern California. USI was formed out of necessity by experienced utility contracting experts that realized the need for safe, fast, and accurate underground utility locating. USI and their team of highly qualified operators and management are committed to performing a fast, safe, and accurate utility locating service. Their high-velocity air-driven excavation delivers the power to cut precise holes into the earth without damaging the utility being located.

Page 182 of 248 ends

15.F.

Page 686 of 1050 ends

41 City of Hemet
Warren Road Improvements

SUB-CONSULTANTS
Pacific Railway Enterprises, Inc. - Railroad Crossing
Pacific Railway Enterprises, Inc. in operations since 1994, provides an array of services to our clients. PRE’s staff have amassed an impressive accumulation of railroad communications and signal expertise in the areas of railroad freight, light rail, commuter and transit signal design, inspection, construction management and maintenance services. PRE was formed to provide signal and train control design and inspections services for railroads and agencies located in the state of California. PRE is a DBE/SBE firm with a staff of experienced Transit and Rail professionals who have demonstrated exceptional expertise in signal and communications systems. PRE provides design and inspection services to transit agencies, light and heavy rail, commuter railroads, and Class 1 railroads.

Translutions, Inc. - Traffic Modeling for Build Out Volumes Translutions will prepare VMT analyses for the project and evaluate the effects on VMT using transportation models, as well as the California Statewide Travel Demand Model.

Monument - Utility Coordination
Monument is a robust team of experts in many right-of-way disciplines. Monument acts as a real estate and right-of-way services consulting partner, equally invested in the goals and objectives of its clients. By engaging as a partner through each phase, Monument brings a tried-and-true approach and powerful solutions to create an effective strategy for each project. Monument is a California-certified Small Business Enterprise (SBE), Disadvantaged Business Enterprise (DBE) and Women Owned Business Enterprise (WBE).

Page 183 of 248 ends

15.F.

Page 687 of 1050 ends

42 City of Hemet
Warren Road Improvements

SECTION
III.
42 PROJECT
SCOPE

Page 184 of 248 ends

15.F.

Page 688 of 1050 ends

43 City of Hemet
Warren Road Improvements

TECHNICAL PROPOSAL

APPROACH AND UNDERSTANDING
Project Understanding
Warren Road
The City of Hemet (City) is seeking proposals for professional engineering services to design the Warren Road Improvements in three phases:

Phase 1 – Esplanade Avenue to Stetson Avenue
Phase 2 – Stetson Avenue to Salt Creek Bridge
Phase 3 – Salt Creek Bridge Widening
These phases may be further divided after a preliminary assessment based on constraints, feasibility, and available funds.

The widening of Warren Road between Esplanade Avenue and Domenigoni Parkway, including the bridge over Salt Creek, is a TUMF-eligible improvement with a total cost of $24.1 million in the current program.

According to the City’s Roadway Circulation Master Plan, Warren Road was classified as a 6-lane divided arterial from Esplanade Avenue to the future Walden Weaver Road and a 4-lane undivided secondary. The City has performed a General Plan Amendment and determined that Warren Road from Esplanade Avenue to Domenigoni Parkway is a 4-lane secondary (70’ curb to curb in a 94’ right-of-way). Warren Road is an important north-south corridor located on the western City boundary, connecting the Ramona Expressway and Domenigoni Parkway.

The existing 2-lane roadway carries a significant amount of high-speed vehicle traffic and has the following deficiencies:
• No paved shoulders
• Sub-standard horizontal curves
• Lack of pedestrian and bicycle infrastructure
• Open roadway ditches and drainage per the Master Plan Storm Drain • Conflicting utilities
• Poor condition of the railroad crossing
• Inadequate intersection controls like traffic signals • Insufficient right-of-way
• Lack of streetlights
• Segment located in the airport restriction zone
• Part of the roadway located in MHSCP criteria cells and RCA reserve lands • Half-width bridge
The City plans to conduct a Preliminary Assessment and Phasing Analysis to identify constraints, feasibility, costs, and schedules. Once funding is secured, the City aims to proceed with the final design. Albert A. Webb Associates Team (WEBB Team) acknowledges the City’s objectives to improve Warren Road, enhancing mobility, safety, and community well-being, thereby elevating residents’ quality of life.

Page 185 of 248 ends

15.F.

Page 689 of 1050 ends

44 City of Hemet
Warren Road Improvements
PROJECT APPROACH:

1. Project Scope
As detailed in our scope of work, our success in delivering complex, multi-disciplinary projects stems from a comprehensive understanding of project requirements, key stakeholder collaboration, the contributions of each discipline, and the feasibility of design features.

2. Project Team
To meet City expectations and uphold our quality standards, we adopt a proactive approach that includes:

Assigning the Right Project Manager, Dilesh Sheth, PE, TE, who will be the primary point of contact for the City, overseeing the delivery of services under this contract. Dilesh will mobilize WEBB services and resources to promptly and effectively respond to the City’s needs. As project manager, he will ensure consistent coordination with the City, maintain the schedule, track the budget, and drive continuous progress across all project fronts.

If Dilesh is unavailable during the contract, Eric Hays will step in as the backup project Manager to continue project coordination seamlessly.

Establishing a Committed and Competent Project Team The WEBB Team will apply its knowledge and experience to carry out tasks described in our scope of work. We intend to partner with the City of Hemet to perform the coordination successfully, complete the design, help with funding, and get the project ready for construction as quickly and efficiently as possible.

In response to the City’s needs and the project’s complexity, WEBB has assembled an experienced team of design experts for the street, drainage, structural, geotechnical, traffic signal, right-of-way mapping, railroad, street light, landscape, and utility coordination elements. The WEBB Team includes exceptionally skilled and local drainage experts Joe Castaneda with JLC Engineering & Consulting and Joseph Caldwell with WEBB. Joe Castaneda will provide drainage analysis and improvement plans for the roadway and MDP storm drain improvements, while Joseph Caldwell will prepare drainage and scour analysis related to the Salt Creek Bridge widening.

The WEBB Team includes exceptionally skilled and the well-experienced Mark Thomas team to support WEBB with the Salt Creek Bridge and help with the project phasing when needed. WEBB is working with Mark Thomas Project Management Approach
Our approach starts with our project manager, Dilesh, implementing the six elements highlighted below.

Project Scope
Provide a well
thought out scope
Quality Review
Perform quality
reviews
Project Team
Engage an
experienced and
effective project team
Project
Communication
Provide effective
communication and
coordination
Budget and Schedule
Maintain budget and
schedule controls
Project Risk and
Challenges
Manage project risks
and challenges

1. 4. 5. 6.

2. 3.

Page 186 of 248 ends

15.F.

Page 690 of 1050 ends

45 City of Hemet
Warren Road Improvements
and Co. on Avenue 50 and Avenue 52 Projects for the City of Indio, the Harley Knox/I-215 Interchange for the City of Perris, and Avenue 50 Bridge for the City of La Quinta.

In addition, we have added a local geotechnical engineering firm, Inland Foundation, and a railroad crossing expert, Pacific Railway Enterprise, to help with the RCTC railroad crossing and CPUC processing and requirements.

3. Budget and Schedule
WEBB is dedicated to delivering technically successful and fiscally responsible projects. This is achieved by employing experienced staff equipped with the right tools for planning and tracking projects. Project cost management involves managing both design fees and construction costs.

Approach to Managing the Schedule: Our schedule management approach focuses on communication, meeting interim milestones, identifying information gaps, and adjusting priorities/resources to address unforeseen delays:

Meeting Interim Milestones: Progress will be monitored through action item lists as deliverables are prepared.

Tracking individual steps in developing technical documentation and setting interim goals/milestones will highlight any schedule slippage early, allowing for resource and priority adjustments.

Identifying Information Gaps: Project delays can occur when key information is unavailable. At the kickoff meeting, the WEBB team will identify needed data and desired timelines and follow up with stakeholders to facilitate information exchange and acquisition.

Adjusting Priorities/Resources: By understanding the project’s status in real-time versus the desired schedule through interim milestones/action item lists, we can initiate resource adjustments (additional help from Mark Thomas) to accelerate the completion of critical path/high-priority activities and keep the project on schedule.

4. Quality Reviews
For each project, WEBB conducts detailed quality control reviews at major deliverable milestones (Conceptual Design, 35%, 60%, 90%, and final level) and compiles an electronic QA/QC binder. This binder serves as a “one-stop shop” for the project’s QC checklists, forms, notes, contract requirements, and submittals. The forms are saved electronically and accessible to all project team members. The QA/QC Manager continually checks to enforce standards and QC procedures.

5. Communication
Progress meetings with the WEBB team will develop/review action item lists and completion status. Results from these meetings, including action items, will be shared with City of Hemet staff via conference calls to confirm information requirements, stakeholder decisions, data availability, and next steps.

6. Project Risks and Challenges
The WEBB team has performed a field review of the project site and understands the project intent and the City’s goals. Based on our review, we have identified challenges and recommended solutions for the project.

After reviewing the existing documents, as-built plans, surveys, and coordination with the City, these potential solutions need more analysis

Page 187 of 248 ends

15.F.

Page 691 of 1050 ends

46 City of Hemet
Warren Road Improvements
Solution: WEBB proposes to conduct a preliminary assessment and phasing analysis to identify constraints, feasibility, opportunities, and phasing. This will ensure that the project aligns with the City’s goals and can be implemented with the current TUMF, DIF, and other funds as soon as possible. The analysis will include, but is not limited to, the following:
• Purpose and Need
• Site Assessment
• Data Collection
• Stakeholder Input
• Alignment Alternatives Phasing Analysis
• Right-of-Way Requirements and Approximate Costs
• Utility Relocation and Costs
• Environmental Determination and Mitigation Measures (By Others) • Opportunities and Risks
• Cost and Funding Strategies – TUMF, DIF, and Developer Fairshare • Delivery Schedule
• Phasing Analysis Report
Solution: Selecting the preferred roadway alignment involves considering several factors to ensure the road is safe, efficient, and cost-effective. We have prepared five exhibits showing potential alignment options (Exhibits A, B, C, and D), drainage improvements (Exhibit E), and bridge widening options. Some factors and potential solutions for the Warren Road alignment are as follows:

Between Esplanade Avenue and Devonshire Avenue (Exhibit A):
• The MWD aqueduct is located on the west side within a typical 350-foot-wide property. Obtaining right-ofway and/or easements from MWD will be difficult, so we propose holding the MWD property line as the west right-of-way line, widening the street to the east, and obtaining the necessary right-of-way and easement from the east. Preliminary analysis indicates we can keep existing SCE transmission/distribution poles in place.
• A developer is pursuing a residential development project (Hemet 80) on the east side. We propose coordinating the alignment and potential fair-share participation. • Approximately ¼ mile of Warren Road is improved to the ultimate on the east side. We will consider shifting the roadway alignment to the east to minimize the proposed widening, reduce costs, and maintain a uniform street section throughout.

Between Devonshire Avenue and Florida Avenue (SR74) (Exhibit A):
• RCA conserved land is located on the west side of Warren Road between Devonshire Avenue and SR74.

According to the MHSCP covered roads right-of-way, the maximum permanent and temporary impacts shall be no greater than 100 feet wide. We propose that the alignment will have no effect on the conservation land and will keep the footprint within 100 feet.

Key Issue #1: Phasing Determination
Key Issue #2: Selecting the Preferred Roadway Alignment

Page 188 of 248 ends

15.F.

Page 692 of 1050 ends

47 City of Hemet
Warren Road Improvements
Between Florida Avenue (SR74) and Stetson Avenue (Exhibit A):
• Hemet Auto Mall is located east of Warren Road and has improved the roadway to the east. 72” and 75” MWD aqueducts cross through Auto Mall and Warren Road, requiring coordination with the MWD. WEBB has recently completed Van Buren Road Improvements at the March JPA boundary, which required close coordination with the MWD. WEBB understands MWD requirements and how to protect its facility. • The Hemet-Ryan airport is located at the northeast corner of the Warren Road and Stetson Avenue intersection. It is in the most restricted Airport Zone A, extending on the west and south sides of the intersection. There are stringent limitations on the improvements, including height. WEBB has designed the Harley Knox Roundabout with breakable street lights just south of the March Airforce Reserve Base in a very restricted area. In addition to the airport restricted area, RCA conservation lands located along the west side will restrict the realignment. WEBB has developed preliminary alignments for Warren Road and Stetson Avenue, as shown in the exhibit in this proposal. The realignment is constrained by RCA reserved lands, and we may not be able to stay completely on Airport Zone A. WEBB will develop the solution for the Hemet-Ryan airport, Riverside County ALUC, and the City.

Between Stetson Avenue and Poplar Street (Exhibit B):
• Warren Road between Stetson Avenue and Corte Del Mar (entry into Del Webb development) crosses existing RCTC railroad tracks, the existing Riverside County Flood Control Channel, and the proposed Walden Weaver Road. RCTC owns the San Jacinto Branch Line (SJBL), which extends 38.3 miles between Highgrove and Hemet. Even if the tracks are not in use, they will require approval from the RCTC. WEBB has completed three railroad crossings in the City of Perris and provided close coordination with RCTC, Metrolink, and CPUC. Since the tracks are not in used we will not require CPUC approval and GO88. • The proposed realignment and widening will require reconstructing the Riverside County Flood Control channel. The drainage improvements are discussed under Key Issue #3. Walden Weaver Road is partially constructed, approximately 600’ from Warren Road to Stetson, just short of Avenue. The extension of Walden Weaver to Warren Road will create a major intersection, which will be signalized in the future. Our alignment study will consider future traffic signal pole locations, which will be very close to the flood control channel and future railroad crossing gates and signals. We have worked on similar railroad crossings, Ellis Avenue/Case Road and Mapes Road/Case Road in Perris, where signalized intersections are located less than 50’ from the intersections.
• A large residential development is proposed on the west side of Warren Road. WEBB will coordinate the designs to ensure roadway drainage and street improvements are adequately addressed and that the ultimate design meets all regulatory requirements and community needs, resulting in safe, functional, and aesthetically pleasing improvements. Additionally, WEBB will work with the City and Developer to establish their fair share.
• We are proposing narrow lanes slightly to avoid widening the existing drainage culvert between Mustang and Poplar, which will lessen the environmental and cost impact.

Page 189 of 248 ends

15.F.

Page 693 of 1050 ends

48 City of Hemet
Warren Road Improvements
Poplar Street to Salt Creek Bridge (Exhibit C, and D):

Using the City’s General Plan and secondary roadway section, w looked into roadway alignment alternatives for Warren Road from the Salt Creek Bridge widening to a logical terminus near Poplar Street.

This first alternative proposes to:
• Construct interim alignment and only widen Warren
Road to the existing Simpson Road
• Only construct edge of shoulder to edge of the
shoulder, allowing for coordination with future
development plans and the ability for the City to
discuss a fair share of trunk line “I.”
• Address and improve stopping sight distance at
the Warren Road/Simpson Road intersection
The second alternative proposes to:
• Introduce a reversing curve and realign and widen
Warren Road to Poplar Street
• Only build curb to curb
• Construct interim trunk line “I” if determined feasible as the ultimate alignment • Both alternatives have independent utility and logical termini for the environmental document and can both be looked at during that phase. This
would be further developed in PS&E, pending discussions about development once the path has been determined.

The Bridge widening will require realignment and widening of Warren Road south of the Domenigoni Parkway to align lanes.

Page 190 of 248 ends

15.F.

Page 694 of 1050 ends

49 City of Hemet
Warren Road Improvements
The Warren Road corridor is located through an area impacted by the San Jacinto Valley Master Drainage Plan and the Regional Hemet Area Drainage Plan. In general, major storm drains north of Tres Cerritos Avenue flow towards the San Jacinto River in the northerly direction. The area south of Tres Cerritos Avenue flows to the southwest towards the Hemet Channel and Salt Creek Channel. The project follows the phases outlined in the RFP, which divides the project into three phases: Phase 1 – Esplanade Avenue to Stetson Avenue, Phase 2 – Stetson Avenue to Salt Creek Bridge, and Phase 3 – Salt Creek Widening.

Phase 1 – Esplanade Avenue to Stetson Avenue
The existing terrain along Warren Road Phase 1 remains mostly undeveloped. Major developments are proposed along this reach, such as Ramona Creek, Tres Cerritos East, and a few other residential developments. The major drainage challenge for this reach is the vernal pool complex located between Devonshire Avenue and Stetson Avenue, just west of Warren Road. The design team has identified four major constraints for the Phase 1 Corridor as follows:

1. Collecting runoff from the hillside area east of Warren Road, which is located between Devonshire Avenue & Tres Cerritos Avenue.

2. The regional flood control facilities and development projects being proposed between Devonshire Avenue and Florida Avenue

3. The existing drainage facilities defined as the Line 2E, existing channels, culverts, and storm drain systems adjacent to Warren Road between Florida Avenue and Stetson Avenue

4. The shallow flooding and vernal pool complex area between Florida Avenue and Stetson Avenue The Project Team proposes to identify the shallow flooding associated with this corridor using HEC-RAS 2D modeling and hydrology results that can be obtained from the Hemet Valley Master Drainage Plan, if available.

The HEC-RAS 2D Model will use either RCFC&WCD or USGS LIDAR topographic mapping to assess the shallow flooding. The purpose of the shallow flooding is to identify interim drainage solutions. The downstream regional drainage facilities required for this area will most likely be constructed after the construction of Warren Road. Therefore, the proposed drainage solutions will ensure that roadway improvements will not adversely impact downstream and upstream property owners.

Phase 2 – Stetson Avenue to Salt Creek Bridge
Warren Road between Stetson Avenue and the Salt Creek Bridge is an active area with several planned developments. Our research shows developments are being constructed along the east side of Warren Road between the Hemet Channel and Poplar Street. These developments direct runoff to the Hemet MDP Line 3B Earthen Channel System. Moreover, there are planned developments on the east side of Warren Road between Poplar Street and Salt Creek Tract Map 38873 and along the west side of Warren Road between Hemet Channel and Mustang Way Tract Map 36481. Tract Map 38873 must direct flows directly to Salt Creek. Tract Map 36481 will send flows into a proposed detention basin that will eventually discharge into Line 3B, eventually discharging runoff into the existing RCFC&WCD Line B system. Along with the proposed development, the Project Team will study the Hemet Channel using data obtained from the RCFC&WCD Hemet Channel study that is in process.

The study’s purpose is to determine the 100-year culvert crossing required for the Hemet Channel just south of the existing RCTD railroad corridor. As part of the Hemet Channel assessment, an ultimate culvert size will be determined based on the roadway constraints. However, the Hemet Channel downstream of Warren Road is a project that will most likely not be constructed for another 10-15 years. As a result, the interim culvert will Key Issue #3 Drainage Improvements

Page 191 of 248 ends

15.F.

Page 695 of 1050 ends

50 City of Hemet
Warren Road Improvements
be designed with a soft bottom backfill condition that matches the existing flowlines within the Hemet Channel.

The Project Team will coordinate with the adjacent developers through Outreach Meetings to develop an overall drainage strategy to resolve drainage issues for the proposed residential developments and Warren Road. The Outreach Meetings aim to determine the timing and schedule associated with the proposed development and Warren Road Improvement Plans. The goal of the Outreach Meeting is to have an ultimate drainage facilities map using the Hemet Valley MDP and the proposed infrastructure constructed as part of the approved Tract Maps. Additionally, the Project Team will develop interim storm drain improvements required for the Warren Road Improvements Plans should future developments post-date the Warren Road project. The goal of the interim storm drain plan is to ensure that interim facility removal is minimized.

Phase 3 – Creek Bridge
Joseph Caldwell has extensive experience in hydraulic modeling and floodplain management. He has led projects like the San Jacinto River project, utilizing advanced modeling techniques and managing stakeholder engagement effectively. His expertise will be crucial for the Warren Road Bridge widening project.WEBB will provide comprehensive engineering services for the hydraulic analysis of the proposed Warren Road Bridge widening in Salt Creek.

The approach includes Verification of Existing Floodplain Hydraulics: Utilizing existing topography and data, the current floodplain hydraulics will be modeled according to RCFC & WCD requirements and the US Army Corps of Engineers HEC-RAS software. Compliance with Caltrans LAPM: Ensuring all analyses adhere to Caltrans Local Assistance Procedures Manual (LAPM) standards.Design and Channel Analysis: Evaluating design requirements and channel geometric characteristics based on upstream and downstream field crosssection data.Investigation of Hydraulic Constraints: Identifying potential constraints before analyzing alternative designs.Multi-Frequency Design Flow Analysis: Assessing the hydraulics of various design flows and their impacts to determine the level of flood protection.Extended Hydraulic Analysis: Extending the analysis upstream and downstream to evaluate the impact of existing flooding fully.Scour and Sediment Transport Analysis: Using hydraulic parameters to determine additional facility protection requirements and the extent of the necessary revetment.

SALT CREEK BRIDGE WIDEN
Our team has extensive experience in bridge river crossings and bridge widenings, including recent projects:

Yorba Linda Blvd Widening over the Santa Ana River and La Novia Ave Bridge widening over San Juan Creek.

Our relevant experience and technical skills are coupled with our creative and innovative design approach to bring significant benefits to the project.

The Existing Salt Creek Bridge, built in 1996, is a continuous 5-span Cast-In-Place Prestressed (CIP/PS) concrete box girders on reinforced concrete pier walls and open-end seat type abutments, all supported on Cast-In-Drilled-Hole (CIDH) concrete piles. Our structures team has obtained the existing Salt Creek bridge asbuilt plans and the Bridge Inspection Reports (BIR) to study the existing bridge type and its conditions for the purpose of this proposal.

Key Issue #4 Salt Creek Bridge Widening

Page 192 of 248 ends

15.F.

Page 696 of 1050 ends

51 City of Hemet
Warren Road Improvements
Salt Creek Bridge Widen - Alternative 1
Salt Creek Bridge widening will consist of constant width of 42’-2” on the northeast side of the existing bridge.

The proposed widening of the Salt Creek Bridge will match the 5-span bridge length. Two types of concrete superstructure are feasible, that will maintain the existing creek freeboard requirement, and both structure types will be studied and compared during preliminary design phase.

Figure 1 - Salt Creek Bridge Widen Alternative 1
Concrete superstructure will be supported on pier walls matching existing bridge piers, its stiffness, and structural behavior in response to seismic activity. Abutments will match existing open-end seat-type abutments as well, providing opening to existing access roads. Proposed widening will be connected to the existing bridge by concrete deck closure pour at the superstructure and drill and bond dowel connections at the substructure, pier walls and abutments. See Figure 1 for Salt Creek Bridge Widen Alternative 1.

Salt Creek Bridge Widen - Alternative 2
Widening Salt Creek Bridge by building a separate and parallel 43’-2” wide bridge northeast of the existing bridge, similar to S. Sanderson Ave bridges upstream, is a feasible alternative. The proposed Salt Creek Bridge (Right) will be separated by a few feet from the existing Salt Creek Bridge (Left) to have enough room for construction. Actual separation distance will be determined during the design phase, considering seismic displacement demand of the two bridges and space requirements for constructability. The proposed Right bridge will match the existing 5-span Left bridge length and structure depth. Separating the structures provides greater flexibility with profile, grade, and alignment, helps facilitate staging, and will also minimize disturbance to existing traffic during construction. Two types of concrete superstructure are feasible, similar to Alternative 1, and both structure types will be studied and compared during Type Selection phase:
• CIP/PS Concrete box girders
• Precast California Wide-Flange (Ca-WF) Concrete girders CIP/PS Concrete Box girders Precast Concrete California Wide-Flange (CA-WF) girders Pros
• No impact to existing
freeboard
• Better aesthetics
• $/SF cost less compare
to precast girders
Cons
• Falsework required
• Longer construction
duration
Pros
• No Falsework required
• Reduced construction
duration
Cons
• $/SF cost more
compared to CIP box
girders
• Will slightly reduce
existing freeboard

Page 193 of 248 ends

15.F.

Page 697 of 1050 ends

52 City of Hemet
Warren Road Improvements
Figure 2 - Salt Creek Bridge Widen Alternative 1
The Right bridge concrete superstructure will be supported on circular multi-column piers since the Right bridge is not connected to the existing bridge. Abutments will match existing Left bridge abutments, open-end seat-type abutments as well, providing opening to existing access roads. Multi-column pier columns will be supported on large diameter concrete Cast-In-Drilled-Hole (CIDH) piles. Multi-column piers on concrete CIDH piles are a more efficient and cost-effective solution compared to the pier walls supported on group of piles.

Both construction duration and construction cost will be reduced. See Figure 2 for Salt Creek Bridge Widen Alternative 2.

Existing Salt Creek Bridge Repair Work
According to the latest inspection, dated July 2, 2024, repair work recommendations are:
• Full bridge deck treatment with Methacrylate resin
• Clean and repair metal tube railing
• Deck drain inlet debris clean up
Existing bridge deck will be treated with Methacrylate resin and deck drain inlets will be cleaned up as part of the bridge widening project for both widen alternatives. Since the proposed bridge widening is connecting on the same side as where the metal tube bridge railing is, this railing will be removed, and railing repair work is no longer required for widen Alternative 1.

Challenges
Key challenges to work through carefully during this project, applicable to both the widen alternatives, are listed below:
• Environmental process and permits
» Pier supports (total 4) are all located within the Salt Creek Channel. Our team is well acquainted with the environmental process for this type of project.
• Construction duration within the environmentally sensitive footprint » Properly sized and laid out pile group will help avoid having unnecessarily large pile cap. Our design team will try to keep pier support pile cap size minimal by using efficient pile size and layout, which will help keep excavation footprint minimal in channel bed, therefore reducing construction duration and cost.

Page 194 of 248 ends

15.F.

Page 698 of 1050 ends

53 City of Hemet
Warren Road Improvements
Street improvement projects require extensive coordination with utility companies to eliminate conflicts, maintain the schedule, and minimize relocation costs. The Warren Road Street Improvement Project, while primarily focused on street improvements, also involves significant utility coordination and relocation efforts. WEBB will strive to minimize the relocation of existing utilities through several overhead and underground utilities along Warren Road, which will need to be relocated or adjusted.

To determine financial responsibility for these relocations, we must first establish prior rights. WEBB’s team will research, compile, and locate all easement interests within and adjacent to the streets. We will have a title company research chain of title reports for each impacted property to determine prior rights. A right-of-way map will be prepared, showing all easements and their dates of recordation. This information, along with supporting documents, will be provided to the various utility companies. Any required relocations or modifications will be coordinated and scheduled accordingly.

WEBB follows a mandatory utility coordination procedure that involves a systematic approach. This includes the following steps:

1. Research

2. Face-to-face meetings

3. Utility logging

4. Preliminary noticing

5. Potholing

6. Field review

7. Design review requests

8. Relocation or adjustment requests
By adhering to this procedure, WEBB ensures effective coordination and minimizes disruptions during the Warren Road Street Improvement Project.

Key Issue #5 Relocation of Utilities

Page 195 of 248 ends

15.F.

Page 699 of 1050 ends

54 City of Hemet
Warren Road Improvements

EXHIBIT A

WARREN ROAD FROM ESPLANADE AVENUE TO STETSON AVENUE
PHASE 1 EXHIBIT

WARREN ROAD
LEGEND

RCA CONSERVATION LAND

HEMET - RYAN AIRPORT - ZONE A

PROPOSED SIDEWALK

WARREN ROAD

RCA CONSERVATION LAND RCA CONSERVATION LAND

RCA CONSERVATION LAND

FLORIDA AVENUE

DEVONSHIRE AVENUE

ESPLANADE AVENUE

STETSON AVENUE

HEMET-RYAN AIRPORT - ZONE A

SAN DIEGO AQUEDUCT

Page 196 of 248 ends

15.F.

Page 700 of 1050 ends

55 City of Hemet
Warren Road Improvements

EXHIBIT B

WARREN ROAD FROM STETSON AVENUE TO DOMENIGONI PARKWAY
PHASE 2 EXHIBIT
LEGEND

RCA CONSERVATION LAND

HEMET - RYAN AIRPORT - ZONE A

PROPOSED SIDEWALKSTETSON AVENUE

MUSTANG WAY

POPLAR STREET

WALDEN WEAVER ROAD

WARREN ROAD

RCA CONSERVATION LAND

HEMET-RYAN AIRPORT - ZONE A

Page 197 of 248 ends

15.F.

Page 701 of 1050 ends

56 City of Hemet
Warren Road Improvements

EXHIBIT C EXHIBIT D

Page 198 of 248 ends

15.F.

Page 702 of 1050 ends

57 City of Hemet
Warren Road Improvements

EXHIBIT E

1. Approximately 1,200 acres of
drainage approximately 1,200 acres
of drainage area must be assessed
in the interim condition between
Esplanade Avenue and Stetson
Avenue

2. Phase 1 is impacted by shallow
flooding phase 1 is impacted
by shallow flooding between
Devonshire Avenue & Florida
Avenue.

3. Phase 1 is impacted by shallow
flooding phase 1 is impacted by
shallow flooding between Whitter
Avenue & Stetson Avenue.

4. Existing approved studies will be
used existing approved studies will
be used between Stetson Avenue
and Poplar Street.

DESIGN NOTE:

Page 199 of 248 ends

15.F.

Page 703 of 1050 ends

58 City of Hemet
Warren Road Improvements
The scope of work consists of three phases: planning/environmental (by others), design (PS&E), and construction support. The work will comply with the requirements of the City of Hemet, Caltrans, AASHTO, County of Riverside, Riverside County Flood Control & Water Conservation District (RCFC&WCD), and the US Army Corps of Engineers (COE).

Phase A – Preliminary Engineering and Phasing Analysis
TASK 1: PROJECT MANAGEMENT/ADMINISTRATION (Phase A only)

1.1 Project Management: We will plan, organize, direct, and monitor project work activities and resources in accordance with the contract scope, schedule, and budget. This task includes ongoing general project management with the City, sub-consultants, and stakeholders, including preparing contract paperwork, memos, letters, emails, phone calls, and maintaining project files. This activity commences after receipt of the Noticeto-Proceed, continues through the submittal of key final project deliverables, and concludes after construction and closeout.

1.2 Meetings and Schedule: We will schedule and attend meetings in the planning phase as follows:
• Kick-off meeting including sub-consultants and agencies • Project Development Team (PDT) meetings
• Stakeholder Meetings
• Meetings with the City’s Environmental Consultant
•
We will schedule, chair, and prepare meeting agendas and minutes for all meetings. The agendas will be submitted to the City for review one working day before the meeting. The minutes will be distributed to all attendees, everyone who was invited, and the City’s Project Manager within five working days after the meeting.

The minutes will include a list of attendees with phone numbers and contact emails, a summary of discussion items, any pertinent information, action items, and follow-up to action items.

We will prepare project schedules for the three phases using Microsoft Project. The project schedules will be divided into tasks and subtasks in full detail, including the City function timeline, critical path, and outside sources such as agencies or utilities.

1.3 Coordination with Sub-consultants and Agencies: We will coordinate the ongoing projects with the Cities, sub-consultants, and other agencies. We will maintain project files and prepare memos, letters, emails, and any other communication necessary to manage the project.

Deliverables: Project Management, PDT Meetings, Meeting Agendas and Minutes (electronic), Monthly Status Reports (electronic), Project Schedules, Monthly Invoices, Quality Control TASK 2: AERIAL TOPOGRAPHIC SURVEY

2.1 Aerial Topographic Survey
• Field locate and recover an existing benchmark and establish survey datum for the project. Vertical datum shall be based on the North America Vertical Datum of 1988 (NAVD88), and Horizontal control will be North American Datum of 1983 (NAD83) State Plan Coordinates, Zone VI, unless otherwise requested. • Set ground control and aerial targets for aerial topographic mapping of the project limits as depicted for

SCOPE OF WORK

Page 200 of 248 ends

15.F.

Page 704 of 1050 ends

59 City of Hemet
Warren Road Improvements
each Phase in Figure 1.
• Obtain existing ground surface elevations and identify surface features within the project limits, including curbs, gutters, pavement areas, sidewalks, utility appurtenances, structures, fence lines, and other visible features.
• Provide a 1” = 40’ scale digital aerial topographic survey of the property with a one-foot contour for the project limits.

Prepare electronic CAD files for the existing planimetric (XP file) and existing ground surface (TO file).

Deliverables:
• Digital color orthorectified photo (1”=40’ scale) from Aerial sub-consultant • Electronic PDF & CAD of Aerial Topographic Survey from Aerial sub-consultant • TO CAD (Topo) file with Civil 3D surface for design.
• XP CAD (Existing Plan) file with existing planimetric linework from aerial topo and field data for design.

Note: This scope of work and budget is based on starting with Phase 1 and proceeding with the phases in sequential order.

TASK 3: TRAFFIC ANALYSIS
We will collect average daily counts (ADT) at six locations and peak hour counts at six major intersections along the corridor. We will determine future traffic volumes using proposed projects, background traffic growth, and General Plan projections. WEBB will review the collision data for the last five years. We will identify the appropriate traffic controls for intersections of Esplanade Avenue, Devonshire Avenue, Stetson Avenue, future Walden Weaver Road, Poplar Street, and Simpson Road. We will also propose safety improvements based on the collision data.

Deliverables:
• Traffic Analysis and traffic control recommendations.

TASK 4: UTILITY INVESTIGATION AND BASE MAPPING
We will contact Dig-Alert to secure an official ticket with contact information for all known utilities within the project limits. Record request forms will be sent to all utility owners requesting as-built facilities and available record drawings. Additional research will be performed with the City, County, Caltrans, MWD, and RCFC&WD to identify locations/potential existence of their facilities within the project limits.

Upon compiling as-built information from utility owners, we will conduct a site visit to identify all existing improvements shown on the as-builts to verify their accuracy and note facilities such as manholes and valves identified in the as-built plans but not visible in the field. These conditions will be flagged and sent to our project survey team. Additionally, follow-up discussions with the utility owners will occur in these cases if past improvement projects have inadvertently paved over the manhole/valve covers.

Deliverables: Records obtained from the city and outside agencies and utility locations are shown on the base mapping.

Page 201 of 248 ends

15.F.

Page 705 of 1050 ends

60 City of Hemet
Warren Road Improvements
TASK 5: GEOTECHNICAL ANALYSIS
Our scope will be completed in two stages. The first stage will consist of a pavement investigation for the entire alignment, from Esplanade Avenue to the Salt Creek Bridge. The second stage will consist of the geotechnical investigation for the Salt Creek Bridge itself.

Stage 1 – Warren Road Pavement Investigation
The pavement investigation will consist of the following general tasks • Preliminary pavement condition survey, determination of pavement coring locations, and encroachment permits. Proposed core locations will be marked on the pavement surface and Underground Service Alert will be notified. Encroachment permits will be obtained from the City of Hemet. • Pavement coring. Preliminarily we plan to core the pavement at a spacing of approximately 1,000 feet, alternating core locations across travel lanes. The thickness of underlying aggregate base will be measured through the core holes and samples of subgrade soil will be obtained for laboratory testing. • Laboratory testing. Laboratory testing will be performed on representative samples obtained from the pavement coring. The testing will include sieve analysis, plastic index, moisture content and R-value. • Analysis and report preparation. A final report will be prepared that will include:
» Photos and description of existing pavement conditions at core locations » Summary of pavement and aggregate base thickness measurements » Laboratory test results
» Site plan(s) with core locations
» Alternative recommendations for pavement rehabilitation including (1) removal and replacement, (2) mill and overlay, and (3) full depth reclamation (FDR)
» Recommendations for pavement section design construction in new pavement areas » Alternative recommendations for pavement subgrade stabilization, as necessary, including cement treatment, crushed rock and geogrid.
» Construction considerations
Caltrans’ Site Investigation Guide for Mechanistic-Empirical Design of California Pavements (2022) will be used as a general guide for the pavement evaluation.

Stage 2 – Salt Creek Bridge Geotechnical Investigation
The geotechnical investigation will consist of the following general tasks. The investigation will be performed in general accordance with Caltrans’ publication, “Foundation Reports for Bridges, 2024”. • Collection and review of pertinent geologic literature, groundwater data, and geotechnical information. This will include review of existing as-built bridge plans, foundation reports and any other available geotechnical information.
• Preparation of exploratory location plan, utility clearance and permitting. An exploration plan will be prepared

Page 202 of 248 ends

15.F.

Page 706 of 1050 ends

61 City of Hemet
Warren Road Improvements
for review by Webb, the City of Hemet and the bridge structure engineer. The plan will show exploration locations, depths and access conditions. We will obtain encroachment permits from the City of Hemet and Riverside County Flood Control District for exploration in the channel and abutment areas.

We understand there may be U.S. Department of Fish and Wildlife, Army Corps of Engineers, and other jurisdictional requirements for exploration within the Salt Creek Channel. The extent of such requirements is not currently known. Any permitting to comply with such requirements is not included in our proposed scope of work.
• Subsurface exploration. We plan to explore the bridge foundation soil conditions with a combination of rotary wash borings and cone penetration test (CPT) soundings. At least one boring or CPT will be placed at each proposed pier and abutment location. Borings and CPTs will extend to planned depths as deep as 100 feet below existing ground surface, or until practical is encountered. The borings will be logged a field staff geologist who will also obtain soil samples for laboratory testing. Shear wave velocity testing will be performed within one of the CPT soundings to determine V100, the average shear wave velocity within the upper 100 feet of soil profile for seismic site classification. • Laboratory testing. Laboratory testing will be performed on selected samples obtained from the borings.

The testing will include unit weight, moisture content, sieve analysis, plastic index, consolidation, direct shear strength and corrosivity. The testing program may be modified, depending on the actual subsurface conditions encountered and samples obtained.
• Analysis and report preparation. The geologic, exploration, and laboratory test data will be reviewed and analyzed to develop conclusions and recommendations for design and construction of the Salt Creek bridge widening. The data, conclusions and recommendations will be summarized in a bridge foundation report that will address the following.
» Site geology and geologic hazards including fault rupture, landsliding, liquefaction, flooding and scour » Subsurface soil and groundwater conditions with idealized soil profiles » Seismicity and acceleration response spectra
» Corrosivity
» Shallow foundations
» Deep foundations
» Bridge abutment and retaining walls
» Approach embankments
» Construction considerations
The bridge foundation report will be prepared in accordance with Caltrans’ Foundation Reports for Bridges format. The report will include results of laboratory testing and logs of test borings (LOTBs).

Deliverables: Records obtained from the city and outside agencies and utility locations are shown on the base mapping.

Page 203 of 248 ends

15.F.

Page 707 of 1050 ends

62 City of Hemet
Warren Road Improvements
TASK 6: DRAINAGE REPORTS

6.1 Warren Road: The scope of work assumes that available hydrology for the ultimate condition is readily available based on studies performed for several developments and the Hemet Valley Master Drainage Plan.

The Project Team will perform research to maximize obtaining the available approved data for the area. This would reduce workload in re-creating hydrology & hydraulic assessments for the area.

The Drainage Report approach will focus on studying the interim condition and assumt that development has not constructed any storm drain infrastructure. Therefore, the scope of work requires the following hydrology and hydraulic assessments to be performed for the area:

1. The project team will perform an offsite hydrology assessment for approximately 1200 acres of area to determine the existing condition flow rate for the project. The assessment will focus on performing a hydrology study for the area between Devonshire Avenue and Stetson Road in order to assess the existing sheet flow condition emanating from the watershed area to the east. The existing condition flow rate will be used to design interim storm drain systems and culverts required to flood protect the project from offsite flows.

2. The project team will perform a localized street hydrology for approximately 5 miles of roadway for Warren Road. The hydrology analyses will use the proposed vertical street design to determine the watershed areas within the road right-of-way.

3. The project team will be required to develop a HEC-RAS 2D Floodplain model to evaluate the shallow flooding that emanates from the watershed east of Warren Road. This shallow floodplain analyses is critical in identifying how the existing area inundates Warren Road. The shallow floodplain model will assist in determining where to place culverts and storm drain to flood protect Warren Road. The floodplain model will also be used to provide the City a pre-project and post-project comparative analyses.

4. During the design process, the project team will develop a drainage facilities map for the project. The drainage facilities map will be a plan that will provide a conceptual solution as the project commences. The drainage facilities map will undergo revisions as the plans are processed to a final 100% plan set.

The hydrology and hydraulic assessment developed for the project will be documented in a Drainage Report.

The project scope assumes that 2-3 iteration of the report will be prepared as part of the Roadway Alignment Study and Advance Planning Study.

6.2 Salt Creek – Warren Road Bridge Widening: WEBB will provide engineering services to perform the Hydraulic Analysis for the proposed Warren Road Bridge widening in Salt Creek. The hydraulic analysis will include verification of existing floodplain hydraulics based on existing topography previously obtained during the research and investigation. The existing floodplain hydraulics condition will be modeled utilizing Riverside County Flood Control District and Water Conservation District (RCFC & WCD) requirements and the US Army Corps of Engineers HEC-RAS analysis software. The analysis will be performed in accordance with Caltrans LAPM. Design requirements and channel geometric characteristics will be analyzed based on the proposed channel upstream and field cross-section information upstream and downstream. Potential hydraulic constraints will be investigated prior to analyzing proposed alternative designs. The hydraulics of multi-frequency design flows will be investigated, and the associated hydraulic impacts will be assessed to determine the level of flood protection associated with the crossing. The hydraulic analysis will extend an adequate distance upstream and downstream from the proposed project to evaluate the impact of the existing flooding fully. Hydraulic parameters generated will be utilized for the scour and sediment transport analysis to determine additional facility protection requirements. In addition, the limits and extent of the required revetment upstream and downstream will be determined.

Deliverables: Draiange Reports for Roadway and Bridge

Page 204 of 248 ends

15.F.

Page 708 of 1050 ends

63 City of Hemet
Warren Road Improvements
TASK 7: COORDINATION WITH ENVIRONMENTAL CONSULTANT
We will coordinate with the city’s consultant to complete the project environmental process, including permit pre-application meetings to discuss the proposed project with, but not limited to, RCA, COE, CDFG, and RWQCB. These meetings will facilitate the permit processing by allowing the resource agencies to comment on the proposed project before submitting the applications and during the environmental permit process.

TASK 8: PRELIMINARY DESIGN

8.1 Roadway Alignment Study
As discussed in the project approach and key issues, we will prepare a roadway alignment study for the corridor.

Alignments will include curb and gutter, sidewalks, driveways, drainage improvements, traffic control, signing and striping, existing and proposed right-of-ways, utility relocations, RCA conservation lands, environmentally sensitive areas, airport restrictions, side roadway realignments, proposed developments, and all other necessary information.

Deliverables: Roadway Alignment Study

8.2 ADVANCE PLANNING STUDY
Mark Thomas will prepare a Structure Advance Planning Study (APS) for the Salt Creek Bridge Widen. APS will consist of one plan sheet showing the basic structure layout, items of work and square foot cost estimate.

The APS and APS Design Memo will document the structure alternative strategies considered, construction staging, falsework needs, proposed aesthetics, constructability, necessary retrofit and structure upgrades, and foundation type assumed. An APS checklist will also be included. The APS will follow Caltrans Memo to Designer manual and the OSFP Information and Procedure guide. Existing bridge as-built plans and Bridge Inspection Reports (BIR) will be reviewed. The APSs will be submitted to Caltrans for review and comment. It is assumed that one round of Caltrans comments will be addressed. The approved APSs will be included as part of the Project Report.

Deliverables: Advance Planning Study
TASK 9: INITIAL COST ESTIMATE AND POTENTIAL FUNDING
We will prepare an initial project cost estimate (hard and soft costs) for the proposed roadway, drainage, bridge, utility, right-of-way, mitigation, environmental, engineering, and construction management. We will also prepare a funding analysis by phase, which will include TUMF, DIF, developer fair share, and other funding options.

Deliverables: Cost Estimate and Funding Stratergy
TASK 10: PHASING ANALYSIS AND RECOMMENDATIONS
WEBB will prepare the phasing analysis and recommendations reports that will identify constraints, feasibility, opportunities, phasing, preferred alignment, cost, funding, mitigation measures, and schedule.

Deliverables: Phasing Analysis Report

Page 205 of 248 ends

15.F.

Page 709 of 1050 ends

64 City of Hemet
Warren Road Improvements
Phase B – Final Plans, Specifications, and Estimate (PS&E) TASK 11: PROJECT MANAGEMENT/ADMINISTRATION (Phase B only)

11.1 Project Management: We will plan, organize, direct, and monitor project work activities and resources in accordance with the contract scope, schedule, and budget. This task includes ongoing general project management with the City, sub-consultants, and stakeholders, including preparing contract paperwork, memos, letters, emails, phone calls, and maintaining project files. This activity commences after receipt of the Notice-toProceed, continues through the submittal of key final project deliverables, and concludes after construction and closeout. We believe that the landscape and irrigation responsibilities should fall to the property owners fronting Warren Road, to be implemented when they develop their projects. Therefore, we have excluded these tasks from our current scope. However, if the City decides to proceed with these elements, WEBB has an in-house landscape group ready to provide the necessary scope and budget.

11.2 Meetings and Schedule: We will schedule and attend meetings in the planning phase as follows:
• Meetings with sub-consultants and agencies
• Project Development Team (PDT) meetings
• Stakeholder Meetings
We will schedule, chair, and prepare meeting agendas and minutes for all meetings. The agendas will be submitted to the City for review one working day before the meeting. The minutes will be distributed to all attendees, everyone who was invited, and the City’s Project Manager within five working days after the meeting.

The minutes will include a list of attendees with phone numbers and contact emails, a summary of discussion items, any pertinent information, action items, and follow-up to action items.

We will prepare project schedules for the remaining phases using Microsoft Project. The project schedules will be divided into tasks and subtasks in full detail, including the City function timeline, critical path, and outside sources such as agencies or utilities.

11.3 Coordination with Sub-consultants and Agencies: We will coordinate the ongoing projects with the Cities, sub-consultants, and other agencies. We will maintain project files and prepare memos, letters, emails, and any other communication necessary to manage the project.

Deliverables: Project Management, PDT Meetings, Meeting Agendas and Minutes (electronic), Monthly Status Reports (electronic), Project Schedules, Monthly Invoices, Quality Control TASK 12: FIELD TOPOGRAPHIC SURVEY

12.1 Supplemental Field Topographic Survey
• Provide a supplemental field topographic survey of proposed project areas to obtain ground surface data obscured in the aerial topographic survey by vegetation, along with existing utility appurtenances (manhole rims, waterlines, meters, valves, fire hydrants, blow-offs, air valves, etc.), and other areas as directed by the engineer/design team to supplement the aerial topography. • Utilizing the aerial topographic data combined with the supplemental field topographic data, provide a topographic survey of the project areas with one-foot contours. • Process and draft topography data and prepare electronic CAD files for the existing ground surface (FT) file, Civil 3D existing surface (TO) file, and existing plan (XP) file for the design team’s use.

Page 206 of 248 ends

15.F.

Page 710 of 1050 ends

65 City of Hemet
Warren Road Improvements
Deliverables:
• TO CAD (Topo) file with Civil 3D surface for design based on aerial and field topo data. • XP CAD (Existing Plan) file with existing planimetric linework based on aerial and field topo data.

TASK 13: PLANS, SPECIFICATIONS, AND ESTIMATE (35%, 60%, 90%, AND FINAL PLANS)

13.1 Roadway Improvement Plan Preparation (3 Phases): The street improvement plans will be in accordance with the current City of Hemet standard plans or standards approved by the City Engineer. Existing utilities shall be indicated in plan view. These plans shall be prepared at a 1”=40’ scale, on 24” x 36” improvement plan sheets, and will consist of:

Street Improvement Plans: existing surface improvements, entrances, driveway approaches, edge of pavement, sewer manhole, water valve and gas valve lids, cross gutters, pedestrian ramps, curb returns, and other details that could be affected by the new construction and shall be shown in a half-tone or dashed background format to distinguish them from the new improvements proposed for the project. New improvements including curbs, gutters, sidewalks, street drainage facilities, street lighting (when required), all facility or structure adjustments to be performed by the contractor (including water valves, gas valves, sewer manholes, telephone manholes, S.C.E. manholes, etc.), all relocations, all reconstructions or modifications shall be shown in full tone or highlighted with appropriate construction note, detail reference, or standard plan reference identified. Also, curb ramps within the project limits shall be upgraded to comply with the latest ADA standards. Construction notes should be arranged such that the first notes are ‘protect in place’ followed by ‘removal’ notes and ending with the actual work. Notes of like work should be grouped together.

13.2 Storm Drain and Culvert Plan (3 Phases): The plans will include hydrology, hydraulic, and structural calculations in conformance with the Riverside County Flood Control and Water Conservation District standards, with probable requirements for review and approval and channel connection permitting by the District. In the absence of district standards, Los Angeles County standards would be considered.

We will provide the necessary plan and profile sheets with hydraulic grade lines, velocity calculations for pipe sizing, and detailing of connections, catch basins, and lateral pipes for all portions of the proposed drain or culvert. This work includes, but is not limited to, determining the water surface, hydraulic grade line (HGL), velocities, manhole spacing, catch basin sizing, and lateral pipe sizing with structural “D” value determination and all other calculations required for a complete storm drain or culvert design. The design shall ensure that the number one lane is free of on-street ponding, per City requirements.

13.3 Signing & Striping Plans (3 Phases): The signing & striping plans will include access ramp locations and types, existing street striping, street legends, crosswalks, traffic signal loops, sign legends, and all other ancillary street markings and signing that may exist or be required to complete the new street improvements.

The signing notes, painted striping notes, and thermoplastic marking notes will be grouped together.

13.4 Traffic Signal Plans (3 Phases)
Phase 1 – Esplanade Avenue to Stetson Avenue

1. Warren Road/Esplanade Avenue Intersection—The City of San Jacinto is proposing to install a signal in 2025. Minor modifications will be required due to additional lanes along Warren Road.

2. Warren Road/Devonshire Avenue Intersection

3. Warren Road/Auto Drive Intersection Modification

4. Warren Road/Stetson Avenue Realigned Intersection

Page 207 of 248 ends

15.F.

Page 711 of 1050 ends

66 City of Hemet
Warren Road Improvements
Phase 2 – Stetson Avenue to Salt Creek Bridge

1. Warren Road/Walden Weaver Intersection

2. Warren Road/Mustang Way

3. Warren Road/Simpson Road Realignment
Phase 3 – Salt Creek Bridge Widening

1. Warren Road/Domenigoni Parkway
The final design will include, but not be limited to, eight-phase controllers with bicycle logic, emergency vehicle pre-emption, telephone connection, and battery backup. It will also include the ultimate sizing of traffic signal poles and arms, pedestrian and bicycle push buttons, poles and pole footings designed to a wind velocity of 100 MPH or greater, adequate storage for turn lanes, and any other improvements, including right-of-way, to signalize the intersection. Traffic signal design shall be ADA compliant, including access ramps, pedestrian push buttons (PPB), and landings adjacent to the PPB.

We will measure the height of the existing overhead utility lines and pothole for traffic signal, safety lighting, and street light clearance of utilities. The plans will clearly show the horizontal location of overhead and underground utilities in the immediate vicinity of the proposed improvements. We will provide a profile drawing showing overhead and underground utilities with elevations and clearance to the proposed traffic signal dimensions from the utility.

We will coordinate with Southern California Edison for the source and location of power for the traffic signals.

The City will provide the address for the meter cabinet when the location is known.

13.5 Street Light Plans (3 Phases)
We will prepare street light location plans, and our sub-consultant will prepare street light conduit and wiring plans per SCE requirements. We will provide coordination with SCE for the service connections.

13.6 Bridge Improvement Plans
Structure Type Selection Report
Mark Thomas will prepare a Structure Type Selection Report to assist the City in determining the best suited structure type for the project. The Type Selection Report will discuss geotechnical, hydraulic, seismic, constructability, aesthetic, utility, and drainage issues related to the structure. Two different alternatives will be considered in the report, which will include a General Plan, Foundation Plan, and General Plan Estimate for each structure alternative. After approval from the City, the Structure Type Selection Report will be submitted to Caltrans Structure Local Assistance for approval.

Structure Design (65%, 95%, and Final Plans)
Mark Thomas will prepare structural calculations and plans for the selected bridge alternative. For the purposes of this scope of work, it is assumed that widen alternative 1, an attached five-span, cast-in-place, post-tensioned box girder on pier walls is the preferred structure alternative. The structure design will be in accordance with AASHTO LRFD Bridge Design Specifications, 8th Edition with the California Amendments and Caltrans Seismic Design Criteria, Version 2.0. The 2024 Caltrans Standards and current versions of the Caltrans Structure Technical Policies and Bridge Design Manuals will be used.

Page 208 of 248 ends

15.F.

Page 712 of 1050 ends

67 City of Hemet
Warren Road Improvements
Structure Independent Check (95% Plans)
City comments from the 65% submittal will be addressed and incorporated into the 95% design. Responses to comments will be prepared and submitted.

Mark Thomas will perform an independent design check of the structure in conformance with Caltrans bridge design procedures. The independent check will be completed by an engineer who was not involved in the original design of the structure. Calculations will be performed to check the bridge layouts and structural integrity. Upon completion of the independent check, discrepancies between the designer and checker will be reconciled and plans updated.

Resident Engineer Pending File
Mark Thomas will compile the necessary documents to be included in the RE Pending file, including the typical information below:
• Joint Movement Rating Calculations for bridge expansion joints (using Caltrans Form DSD-D-0129) prepared in accordance with Bridge Memo to Designers.
• Final Foundation Report (one copy)
• Final Hydrology/Hydraulics Report (one copy)
• Quantity summary sheets for Bar Reinforcing, Concrete, Piles, Miscellaneous Metal, Structure Excavation and Structure Backfill. Summary sheets are prepared in accordance with Bridge Design Aids. • Special instructions or information from the Designer to the Resident Engineer/Structure Representative. As a minimum, this should include the following:
» The intent of the designer where misinterpretation of contract documents is possible » Alerts to details or sequences.
» A description of construction methods anticipated for unique or unusual designs. » Special falsework or shoring concepts and requirements. • As-Built plans for existing structures.
• 1” = 4’ Deck Contour Plots (4-Scales) prepared in accordance with Bridge Memo to Designers

13.7 Specifications and Bid Documents
The City will provide us with its boilerplate Specifications and Technical Provisions in Microsoft Word format. We will compile the project specifications, including the project-specific scope of work in the Technical Specifications, and provide Special Technical Provisions beyond the City’s standard Technical Provisions. With each submittal, WEBB will provide a bid schedule, special provisions, and technical specifications. The specifications will be signed by a civil engineer registered in the state of California as complete and ready for bidding purposes and awarding contracts for construction for the improvements. The latest edition of the Greenbook (Standard Specifications for Public Works Construction and subsequent amendments) and Caltrans Specifications will be used on the project.

Task 13.7.1 Special Provisions
Mark Thomas will develop project special provisions using Caltrans Standard Special Provisions (2024 version).

The special provisions will be prepared using Microsoft Word. Special Provisions will be submitted at the 95% and 100% submittals. It is assumed the City will provide the boilerplate contract language to be included in the specifications at the 95% submittal.

Page 209 of 248 ends

15.F.

Page 713 of 1050 ends

68 City of Hemet
Warren Road Improvements

13.8 Cost Estimate
We will provide a construction quantity and cost estimate with each submittal of plans. The unit costs will be based on the most current cost information for recent similar projects in the area compiled by us and approved by the City. The estimated items of work with quantities will include, but not be limited to, itemizing all removals, clearing and grubbing, relocations, sidewalk, curb & gutter, driveway approaches, Asphalt Concrete (AC), utility improvements, applying/painting of pavement legends & striping, signs, traffic control, raised pavement markers, street lights in City limits, storm drain improvements, and project identification and completion signs.

The estimates will also include probable costs for utility relocations, right-of-way, and temporary construction easements.

Deliverables: Street, Strom, Traffic Signal, Signing & Striping, Street Light, Bridge Type Selection Report, and Bridge Report, Independent Check, Specifications, and Cost Estimate TASK 14: UTILITY COORDINATION

14.1 Utility Relocation Coordination
As part of our comprehensive service, we will proceed with drafting and issuing Relocation Claim Letters and Relocation Claim Letters to all utility owners affected within the project limits. This process includes overseeing the coordination of relocation plans as deemed necessary. Monument places a high priority on transparent communication and collaboration; thus, we will actively engage with the City to obtain their concurrence, keeping all stakeholders well-informed throughout the process.

In instances where utility relocation is not necessary due to alignment with the project, Monument will issue No Conflict letters to the Owner, officially closing the utility files for those entities. Our commitment to excellence and strategic coordination is focused on delivering a smooth and successful project outcome.

Seven utility owners have been identified by DigAlert and the Project scope as possibly having facilities present in the project area and will have to be addressed:
• City of Hemet
• Easter Municipal Water District
• Frontier
• Metropolitan Water District
• Southern California Edison
• Southern California Gas – District
• Spectrum
Phase 1 – Espanade Avenue to Stetson Avenue
In summary, Monument’s Utility Relocation Support encompasses the following comprehensive services:
• Monument will serve as the primary liaison with utility owners identified on the utility plans. • Obtain and organize utility facility maps.
• Actively engage in monthly Project Development Team (PDT) meetings, with an estimated participation of 18 meetings.
• Collaborate with PE to identify and verify facilities considered in conflict. • Coordinate with PE in preparing the conflict matrix and exhibits required for utility companies with conflicting facilities.
• Prepare the Relocation Claim Letters, facilitating the verification of installation rights and initiation of relocation plans (estimated issuance of 15 letters).

Page 210 of 248 ends

15.F.

Page 714 of 1050 ends

69 City of Hemet
Warren Road Improvements
• Determine if utility companies hold prior rights for each conflicting utility. • Plan and facilitate meetings among utility owners and the design team as needed to discuss project design, utility conflicts, relocation alternatives, and conflict resolution plans (estimated 10 meetings, including field meetings).
• Determine liability for facilities conflicting with the project (estimated for 10 conflicts). • Collaborate with the City and PE for the review and approvals of all submittals. • Coordinate the electrical service between PE and SCE. • Obtain detailed relocation plans and, if necessary, cost estimates from utility owners. • Draft and issue Notice to Owner to relocate (estimated issuance of 5 notices). • Draft and issue no-conflict letters for facilities not impacting proposed improvements. • Draft meeting agendas and minutes to ensure thorough documentation. • Assemble and deliver the final close-out file for the utility relocation process and provide all correspondence with utility companies
Utility Assumptions:
• Assumed that the project will bear the expenses for acquiring as-built plans or covering special processing fees if mandated by the utility owner.
• Assumed that there will be 10 utility facilities in conflict, leading to the preparation of Notices to Owners specifically tailored for these 10 facilities.
• Assumed that 1 utility agreements will be required.
• Assumed project engineer to be responsible for updating the utility base plan based on information from utility companies, identifying conflicts, and preparing necessary maps and matrices. • Assumed project engineer will generate a Composite Utility Plan displaying all existing utilities within the proposed construction area and those impacted by the project. • Assumed project engineer identifying and depicting all utility poles on plans, including structure numbers. • Assumed project engineer will provide utility companies with required Cad files. • Assumed that the design for new and relocated utilities will be conducted by the respective utility owners. • Assumed inspection of utility relocation construction, including obtaining final as-built to be conducted by other entities.
• Assumed project engineer will review and approve all utility relocation plans. • Assumed all utility service meters to be acquisition costs, and the project engineer will handle the application and processing for City meters addresses for new utility services. • Assumed the costs and efforts related to utility replacement easements, additional property rights, and actual relocation or construction management/inspection are not included within the utility coordination scope and fee.
• Assumed that traffic signals and intersections lighting are part of the project engineer’s electrical design plan and not considered utilities.
• Assumed project engineer to be responsible for updating the street lighting electrical service plan, identifying service locations, prepare electrical service plan for traffic signals, obtain City concurrence, obtain address for meters and preparing necessary SCE service forms.
• Assumes 5 Street lights will need to be coordinated.
• Assumed project engineer will incorporate utility specifications in the final design plans. • Assumed project engineer to update right-of-way requirements impacted by the relocation of utilities. • Assumed scope excludes any fees associated with the actual relocation of utility facilities and/or construction management/inspection.
• Assumed that potholing services are not required but could be provided for an additional fee.

Page 211 of 248 ends

15.F.

Page 715 of 1050 ends

70 City of Hemet
Warren Road Improvements
• Assumed that ground-penetrating radar services are not required but could be provided for an additional fee.
• Assumed that the project will be completed 18 months from the Notice to Proceed (NTP). Monument may require a change order for additional services if any delays impact the completion date.

Phase 2 – Stetson Avenue to Domenigoni Parkway
In summary, Monument’s Utility Relocation Support encompasses the following comprehensive services:
• Monument will serve as the primary liaison with utility owners identified on the utility plans. • Obtain and organize utility facility maps.
• Actively engage in monthly Project Development Team (PDT) meetings, with an estimated participation of 18 meetings.
• Collaborate with PE to identify and verify facilities considered in conflict. • Coordinate with PE in preparing the conflict matrix and exhibits required for utility companies with conflicting facilities.
• Prepare the Relocation Claim Letters, facilitating the verification of installation rights and initiation of relocation plans (estimated issuance of 7 letters).
• Determine if utility companies hold prior rights for each conflicting utility. • Plan and facilitate meetings among utility owners and the design team as needed to discuss project design, utility conflicts, relocation alternatives, and conflict resolution plans (estimated 18 meetings, including field meetings).
• Determine liability for facilities conflicting with the project (estimated for 21 conflicts). • Collaborate with the City and PE for the review and approvals of all submittals. • Coordinate the electrical service between PE and SCE. • Obtain detailed relocation plans and, if necessary, cost estimates from utility owners. • Draft and issue Notice to Owner to relocate (estimated issuance of 5 notices). • Draft and issue no-conflict letters for facilities not impacting proposed improvements. • Draft meeting agendas and minutes to ensure thorough documentation. • Assemble and deliver the final close-out file for the utility relocation process and provide all correspondence with utility companies.

Utility Assumptions:
• Assumed that the project will bear the expenses for acquiring as-built plans or covering special processing fees if mandated by the utility owner.
• Assumed that there will be 21 utility facilities in conflict, leading to the preparation of Notices to Owners specifically tailored for these 21 facilities.
• Assumed that 1 utility agreements will be required.
• Assumed project engineer to be responsible for updating the utility base plan based on information from utility companies, identifying conflicts, and preparing necessary maps and matrices. • Assumed project engineer will generate a Composite Utility Plan displaying all existing utilities within the proposed construction area and those impacted by the project. • Assumed project engineer identifying and depicting all utility poles on plans, including structure numbers. • Assumed project engineer will provide utility companies with required Cad files. • Assumed that the design for new and relocated utilities will be conducted by the respective utility owners.

Page 212 of 248 ends

15.F.

Page 716 of 1050 ends

71 City of Hemet
Warren Road Improvements
Phase 3 – Salt Creek Bridge Widening
In summary, Monument’s Utility Relocation Support encompasses the following comprehensive services:
• Monument will serve as the primary liaison with utility owners identified on the utility plans. • Obtain and organize utility facility maps.
• Actively engage in monthly Project Development Team (PDT) meetings, with an estimated participation of 18 meetings.
• Collaborate with PE to identify and verify facilities considered in conflict. • Coordinate with PE in preparing the conflict matrix and exhibits required for utility companies with conflicting facilities.
• Prepare the Relocation Claim Letters, facilitating the verification of installation rights and initiation of relocation plans (estimated issuance of 4 letters).
• Determine if utility companies hold prior rights for each conflicting utility. • Plan and facilitate meetings among utility owners and the design team as needed to discuss project design, utility conflicts, relocation alternatives, and conflict resolution plans (estimated 5 meetings, including field meetings).
• Determine liability for facilities conflicting with the project (estimated for 2 conflicts). • Collaborate with the City and PE for the review and approvals of all submittals. • Coordinate the electrical service between PE and SCE. • Obtain detailed relocation plans and, if necessary, cost estimates from utility owners. • Draft and issue Notice to Owner to relocate (estimated issuance of 2 notices). • Draft and issue no-conflict letters for facilities not impacting proposed improvements. • Draft meeting agendas and minutes to ensure thorough documentation. • Assemble and deliver the final close-out file for the utility relocation process and provide all correspondence with utility companies.

Utility Assumptions:
• Assumed that the project will bear the expenses for acquiring as-built plans or covering special processing fees if mandated by the utility owner.
• Assumed that there will be 2 utility facilities in conflict, leading to the preparation of Notices to Owners specifically tailored for these 2 facilities.
• Assumed that 0 utility agreements will be required.
• Assumed project engineer to be responsible for updating the utility base plan based on information from utility companies, identifying conflicts, and preparing necessary maps and matrices. • Assumed project engineer will generate a Composite Utility Plan displaying all existing utilities within the proposed construction area and those impacted by the project. • Assumed project engineer identifying and depicting all utility poles on plans, including structure numbers. • Assumed project engineer will provide utility companies with required Cad files. • Assumed that the design for new and relocated utilities will be conducted by the respective utility owners.

14.2 Utility Potholing: We will pothole all underground utilities to determine the depth for clearance or conflicts for any underground improvements such as gas lines, telephone lines, electrical lines, sewer lines, water lines, storm drain lines, MWD aqueducts, etc. We will submit to each utility company a preliminary set of plans that provide the location, elevation of the utility, and the elevation of the improvement with the conflict area clouded to show the utility companies the areas of conflict with the proposed improvement. The potholing information and plan shall be submitted to the City after completion of that task.

Deliverables: Certified List of Utilities per USA, Utility Conflict Mapping Procedure (“ABC” Letters), and Utility Pothole Field Surveys

Page 213 of 248 ends

15.F.

Page 717 of 1050 ends

72 City of Hemet
Warren Road Improvements
TASK 15: RIGHT OF WAY

15.1 Title Reports (3 Phases)
• An allowance has been included in the budget to obtain and furnish up to thirty (30) Title Reports as needed from a title company. Title reports will be used to verify legal ownership, legal description of the property, and other easements/encumbrances on the property that may impact the project alignment and/or easement rights.

Deliverable:
• Title Reports.

15.2 Record of Survey
• Utilizing the grant deeds/title reports obtained, together with documents obtained through public research, compile all appropriate reference materials pertaining to the project alignment, including referenced Record Maps, Corner Records, Tie Sheets, and Right-of-Way maps. • Perform a field survey to locate and verify existing monuments and property corners. • Prepare a Record of Survey for the project alignment based on the reference documents obtained through research, to establish the existing centerline alignment and right-of-way of Warren Road, per Riverside County requirements, including Map Title, Surveyor Notes, Map Body, Legible Map Data, and Legend as applicable.
• If necessary, set survey monuments in accordance with Riverside County Ordinance 460. • Prepare Record of Survey application and compile all research and reference documents. • Submit Record of Survey application and process through Riverside County Survey Department for review and recordation.

Deliverables:
• Electronic PDF of approved and filed Record of Survey, signed & stamped by a Licensed Land Surveyor and Riverside County Surveyor.
• PB CAD (Property Boundary) file with 2D linework for road centerlines, right-of-way, and property lines for design.

15.3 Legal Descriptions & Plats (3 Phases)
• Prepare legal descriptions and plats per City standards and requirements for proposed Right-of-Way and easement acquisitions utilizing the Record of Survey prepared and recorded as the base. Currently, the number of Right-of-Way and easement acquisitions is unknown; therefore, for the purposes of this proposal, we have included forty (40) legal descriptions & plats. • Provide coordination, attend meetings, participate in phone calls, and respond to emails with City staff and project design team members through the preparation of the legal description and plat. • Coordinate with City staff to have signature pages prepared based on owner information noted in preliminary title reports.
• Coordinate with City staff to obtain owner’s signatures and record at the County of Riverside Recorder’s Office.

Deliverable:
• PDF (and wet signed original if required) of the legal description(s) and plat(s).

Page 214 of 248 ends

15.F.

Page 718 of 1050 ends

73 City of Hemet
Warren Road Improvements
Phase C – Bidding and Construction Support
Task 16: Bidding Support Services (3 Phases): We will attend up to three pre-bid meetings with the appropriate technical personnel. When requested by the City, we will respond to bidder inquiries for the updated Final PS&E bid package. Should the City request bid addendum documents and plans, we will require an addendum to the contract to account for the additional work. We will attend up to three pre-construction meetings with the appropriate technical personnel.

Task 17: Construction Support Services (3 Phases)
We will draft Request for Information (RFI) responses as requested by the Resident Engineer and assist the City in issuing Contract Change Orders as requested by the City. We will respond to RFIs and/or Contract Change Orders in any combination.

17.1 Pre-Construction Meetings

17.2 Response to RFIs

17.3 Review Contractor Change Orders

17.4 Final Record Drawings
Deliverables: Attendance at up to three Pre-Bid Meetings, three Pre-Construction Meetings, RFI Responses and/or Contract Change Orders, and final Record Drawings.

Page 215 of 248 ends

15.F.

Page 719 of 1050 ends

74 City of Hemet
Warren Road Improvements

PROJECT

SCHEDULE
ID Task Name Duration Start Finish 1 Project Kick-Off Meeting 0 days Mon 3/24/25 Mon 3/24/25 2 Phase A - Preliminary Engineering and Phasing Analysis 260 days Mon 3/24/25 Fri 3/20/26 3 Task 1 - Project Management 260 days Mon 3/24/25 Fri 3/20/26 4 Task 2 - Aerial Topographic Survey 60 days Mon 3/24/25 Fri 6/13/25 5 Task 3 - Traffic Analysis 60 days Mon 3/24/25 Fri 6/13/25 6 Task 4 - Utility Investigation and Base Mapping 60 days Mon 3/24/25 Fri 6/13/25 7 Task 5 - Geotechnical Analysis 60 days Mon 3/24/25 Fri 6/13/25 8 Task 6 - Drainage Reports 60 days Mon 6/16/25 Fri 9/5/25 9 Task 8.1 - Roadway Alignment Study 60 days Mon 6/16/25 Fri 9/5/25 10 Task 8.2 - Advance Planning Study 60 days Mon 6/16/25 Fri 9/5/25 11 City and Agency Review of Drainage Reports, Roadway Alignment Study, Advance Planning Study
30 days Mon 9/8/25 Fri 10/17/25
12 Revise Drainage Reports, Roadway Alignment Study, and Advance Planning Study
40 days Mon 10/20/25 Fri 12/12/25
13 Task 9 - Initial Cost Estimate & Potential Funding 40 days Mon 10/20/25 Fri 12/12/25 15 City Review of Drainage Reports, Roadway Alignment Study, Advance Planning Study, and Cost Estimate & Potential Funding 40 days Mon 12/15/25 Fri 2/6/26
16 Task 10 - Phasing Analysis & Recommendations 30 days Mon 2/9/26 Fri 3/20/26 14 Coordination with Environmental Consultant 110 days Mon 10/20/25 Fri 3/20/26 17 Phase B - Plans, Specifications, and Estimate (35%, 60%, 90%, and Final)
385 days Mon 3/23/26 Fri 9/10/27
18 Task 11 - Project Management 385 days Mon 3/23/26 Fri 9/10/27 19 Task 12 - Field Topographic Survey 60 days Mon 3/23/26 Fri 6/12/26 20 Task 13 - Phase 1 - Esplanade to Stetson Plans, Specifications, and Cost Estimate
325 days Mon 6/15/26 Fri 9/10/27
21 Phase 1 - Roadway, Storm Drain & Culvert, Singing & Striping, Traffic Signal, and Street Light Plans (35%)
80 days Mon 6/15/26 Fri 10/2/26
22 City and Agency Review 20 days Mon 10/5/26 Fri 10/30/26 23 Phase 1 - Roadway, Storm Drain & Culvert, Signing & Striping, Traffic Signal, Street Light Plans, Specifications, and Cost Estimate (60%)
80 days Mon 11/2/26 Fri 2/19/27
24 City and Agency Review 20 days Mon 2/22/27 Fri 3/19/27 25 Phase 1 - Roadway, Storm Drain & Culvert, Signing & Striping, Traffic Signal, Street Light Plans, Specifications, and Cost Estimate (90%)
60 days Mon 3/22/27 Fri 6/11/27
26 City and Agency Review 20 days Mon 6/14/27 Fri 7/9/27 27 Phase 1 - Roadway, Strom Drain & Culvert, Signing & Striping, Traffic Signal, Street Light Plans, Specifications, and Cost Estimate (Final)
40 days Mon 7/12/27 Fri 9/3/27
28 City and Agency Final Submittal for Signature 5 days Mon 9/6/27 Fri 9/10/27 29 Task 14 - Utility Coordination 240 days Mon 10/5/26 Fri 9/3/27 30 Utility Conflict Mapping/Utility Relocation Coordination & Agreements
12 mons Mon 10/5/26 Fri 9/3/27
31 Utility Potholing 20 days Mon 2/22/27 Fri 3/19/27
32 Task 15 - Right of Way 240 days Mon 10/5/26 Fri 9/3/27 33 Title Reports 15 days Mon 10/5/26 Fri 10/23/26
34 Legal & Plats 80 days Mon 11/2/26 Fri 2/19/27
35 City Review 20 days Mon 2/22/27 Fri 3/19/27
36 Legal & Plats Corrections 60 days Mon 3/22/27 Fri 6/11/27 37 City Review 20 days Mon 6/14/27 Fri 7/9/27
38 Legal & Plants Approval 40 days Mon 7/12/27 Fri 9/3/27 39 Phase B - Plans, Specifications, and Estimate (35%, 60%, 90%, and Final)
340 days Mon 9/6/27 Fri 12/22/28
40 Task 11 - Project Management 335 days Mon 9/13/27 Fri 12/22/28 41 Task 12 - Field Topographic Survey 40 days Mon 9/13/27 Fri 11/5/27 42 Task 13 - Phase 2 Stetson to Salt Creek Bridge and Phase 3 Salt Creek Bridge Widening Plans, Specifications, and Cost Estimate 340 days Mon 9/6/27 Fri 12/22/28
43 Phase 2 and 3 - Roadway, Bridge, Storm Drain & Culvert, Singing & Striping, Traffic Signal, and Street Light Plans (35%) 80 days Mon 9/6/27 Fri 12/24/27
44 City and Agency Review 20 days Mon 12/27/27 Fri 1/21/28 45 Phase 2 and 3 - Roadway, Bridge, Storm Drain & Culvert, Signing & Striping, Traffic Signal, Street Light Plans, Specifications, and Cost Estimate (60%)
80 days Mon 1/24/28 Fri 5/12/28
46 City and Agency Review 20 days Mon 5/15/28 Fri 6/9/28 47 Phase 2 and 3 - Roadway, Bridge, Storm Drain & Culvert, Signing & Striping, Traffic Signal, Street Light Plans, Specifications, and Cost Estimate (90%)
60 days Mon 6/12/28 Fri 9/1/28
48 City and Agency Review 20 days Mon 9/4/28 Fri 9/29/28 49 Phase 2 and 3 - Roadway, Bridge, Strom Drain & Culvert, Signing & Striping, Traffic Signal, Street Light Plans, Specifications, and Cost Estimate (Final)
40 days Mon 10/2/28 Fri 11/24/28
50 City and Agency Final Submittal for Signature 20 days Mon 11/27/28 Fri 12/22/28 51 Task 14 - Utility Coordination 240 days Mon 12/27/27 Fri 11/24/28 52 Utility Conflict Mapping/Utility Relocation Coordination & Agreements
12 mons Mon 12/27/27 Fri 11/24/28
53 Utility Potholing 20 days Mon 1/24/28 Fri 2/18/28
54 Task 15 - Right of Way 240 days Mon 1/24/28 Fri 12/22/28 55 Title Reports 20 days Mon 1/24/28 Fri 2/18/28
56 Legal & Plats 80 days Mon 2/21/28 Fri 6/9/28
57 City Review 20 days Mon 6/12/28 Fri 7/7/28
58 Legal & Plats Corrections 80 days Mon 7/10/28 Fri 10/27/28 59 City Review 40 days Mon 10/30/28 Fri 12/22/28
60 Legal and Plats Approval 20 days Mon 10/30/28 Fri 11/24/28 3/24
Phase A - Preliminary Engineering and Phasing Analysis
Phase 1 -Esplanade to Stetson (PS&E)
Phase 2 and 3 Stetson to Salt Creek Bridge Widening (PS&E) Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
Deadline
Progress
Manual Progress
City of Hemet - Warren Road Improvements

Page 1 ends

24-0770_Warren Road Improvem

Page 216 of 248 ends

15.F.

Page 720 of 1050 ends

Prepared for:

City of Hemet
Cost Proposal to Provide Professional Engineering
Services for

WARREN ROAD

IMPROVEMENTS
January 30, 2025
webbassociates.com

Page 217 of 248 ends

15.F.

Page 721 of 1050 ends

2 City of Hemet
Warren Road Improvements

SECTION
IV.
2 FEE

SCHEDULE

Page 218 of 248 ends

15.F.

Page 722 of 1050 ends

3 City of Hemet
Warren Road Improvements
FEE

SCHEDULE
Item Description
Dilesh R. Sheth, Principal II Myung G. Choo, Principal I Nicholas R. Lowe, Principal I Son H. Le, Associate III Kawai C. Mang, Associate III Joy A. Schwiebert, Associate I Deborah A. Saulina, Assistant III Joseph C. Caldwell, Principal II Eric Hays, Principal I Jason Ardery, Principal II Michael E. Johnson, Principal II Andres Lopez, Senior II Jordan T. Moretti, Associate I 2-Man Survey Party
Total HoursWEBB- LaborMark ThomasInland FoundationInland AerialJLCTranslutionsExpenses Total/task1
Billout Rate $ 298$ 298$ 312 $ 240$ 240 $ 163$ 312$ 217 $ 312$ 312$ 267$ 217$ 298 326$

PHASE A - PRELIMINARY ENGINEERING AND PHASING ANALYSIS
Task 1 - Project Management / Administration (Phase A Only) (T&M) 88 44 64 196 $ 53,700 $ 25,357 $ - $ - $ - $ - $ 3,000 $ 82,057

1.1 Project Management 24 24 48 $ 14,640 $ 19,787 $ -$ - $ -$ 3,000$ - $ 37,427

1.2 Meetings and Schedule 40 20 40 100 $ 27,660 $ 5,570 $ -$ - $ -$ -$ - $ 33,230

1.3 Coordination with Sub-consultants and Agencies 24 24 48 $ 11,400 $ - $ -$ - $ -$ - $ 11,400 Task 2 - Aerial Topographic Survey 4 8 8 3 3 4 15 14 59 $ 15,047 $ - $ - $30,470 $ - $ - $ 106 $ 45,623

2.1 Aerial Topographic Survey 4 8 8 3 3 4 15 14 59 $ 15,047 $ - $ 30,470$ - $ -$ 106$ - $ 45,623 Task 3 - Traffic Analysis 4 8 60 8 80 $ 19,336 $ - $ - $ - $ - $20,900 $ 2,000 $ 42,236

3.1 Traffic Analysis 4 8 60 8 80 $ 19,336 $ - $ -$ - $ 20,900$ - 2,000$ $ 42,236 Task 4 - Utility Investigation and Base Mapping (T&M) 8 80 12 100 $ 21,812 $ 5,808 $ - $ - $ - $ - $ - $ 27,620

4.1 Utility Investigation 8 12 20 $ 4,452 $ - $ -$ - $ -$ - $ 4,452

4.2 Base Mapping 80 80 $ 17,360 $ 5,808 $ -$ - $ -$ - $ 23,168 Task 5 - Geotechnical Analysis 16 16 8 40 $ 9,768 -$ 159,830 $ -$ $ -$ -$ 169,598 - $

5.1 Phase 1 and 2 - Warren Road Pavement Investigation 8 84 20 $ 4,884 $ 27,830 - $ -$ $ -$ - $ 32,714

5.2 Phase 3 - Salt Creek Bridge Geotechnical Investigation 8 84 20 $ 4,884 $ 132,000 - $ -$ $ -$ - $ 136,884 Task 6 - Drainage Reports 8 4 30 60 102 $ 30,388 $ - $ - $ - $ 98,010 $ - $ - $ 128,398

6.1 Phase 1 and 2 - Warren Road 4 4 $ 1,248 $ - $ -$ 98,010 - $ -$ $ 99,258

6.2 Phase 3 -Salt Creek - Warren Road Bridge Widening4 4 30 60 98 $ 29,140 $ - $ -$ - $ -$ - $ 29,140 Task 7 - Coordination with Environmental Consultant (T&M) 16 24 16 16 72 $ 17,800 $ - $ - $ - $ - $ - $ - $ 17,800

7.1 Coordination with Environmental Consultant (T&) 16 24 16 16 72 $ 17,800 $ - $ -$ - $ -$ - $ 17,800 Task 8 - Preliminary Design 44 24 300 100 4 472 $ 115,232 $ 75,975 $ - $ - $ - $ - $ - $ 191,207

8.1 Roadway Alignment Study 40 24 300 100 464 $ 113,332 $ 41,642 $ -$ - $ -$ - $ 154,974

8.2 Advance Planning Study 4 4 8 $ 34,333 1,900 $ $ -$ - $ -$ - $ 36,233 Task 9 - Initial Cost Estimate and Potential Funding 16 24 60 24 124 $ 29,076 $ 7,374 $ - $ - $ - $ - $ - $ 36,450

9.1 Initial Cost Estimate and Potential Funding 16 24 60 24 124 $ 29,076 $ 7,374 $ -$ - $ -$ - $ 36,450 Task 10 - Phasing Analysis and Recommendations 16 16 24 16 8 80 $ 20,072 -$ $ -$ - $ -$ -$ 20,072 - $

10.1 Phasing Analysis and Recommendations 16 16 24 16 8 80 $ 20,072 $ - $ -$ - $ -$ - $ 20,072 Total 220 64 8 300 60 312 144 54 124 3 3 4 15 14 1325 $ 332,231 $ 114,514 $ 159,830 $30,470 $ 98,010 $20,900 $ 5,106 $ 761,061 Warren Road Improvements - Preliminary Phase - Preliminary Engineering and Phasing Analysis City of Hemet

Page 219 of 248 ends

15.F.

Page 723 of 1050 ends

4 City of Hemet
Warren Road Improvements
FEE

SCHEDULE
Item Description
Dilesh R. Sheth, Principal II Myung G. Choo, Principal I Nicholas R. Lowe, Principal I Son H. Le, Associate III Joy A. Schwiebert, Associate I Wendy N. Albarran, Assistant V Nancy Ochoa, Assistant V Deborah A. Saulina, Assistant III Eric Hays, Principal I Jason Ardery, Principal II Michael E. Johnson, Principal II Jon Ros, Senior II Andres Lopez, Senior II Jordan T. Moretti, Associate I Andrew Simpson, Project Coordinator 2-Man Survey Party
Total HoursWEBB- LaborSub-consultant budgetMonumentUltra EngineeringVisual Concepts IncJLCExpenses Total/task1
Billout Rate $ 312 $ 298 $ 298 $ 240 $ 196$ 217 $ 196 $ 298$ 312$ 312$ 163 $ 267$ 217$ 141$ 326$ 267

PHASE B - PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E)
Task 11 - Final Plans, Specifications, & Cost Estim Project Management / Administration (Phase B only) ate (T&M) 160 24 40 140 80 444 $ 112,412 $ - $ - $ - $ - $ - $ - $ 112,412

11.1 Project Management 60 40 100 $ 30,640 -$ -$ -$ -$ $ 30,640

11.2 Meetings and Schedule 60 16 60 40 176 $ 45,188 -$ -$ -$ -$ $ 45,188

11.3 Coordination with Sub-consultants and Agencies 40 8 40 80 168 $ 36,584 -$ -$ -$ -$ $ 36,584 Task 12 - Field Topographic Survey 4 16 8 1 1 5 18 26 79 $ 20,365 $ - $ - $ - $ - $ - $ 160 $ 20,525

12.1 Supplemental Field Topographic Survey 4 16 8 1 1 5 18 26 79 $ 20,365 -$ -$ -$ -$ 160 $ $ 20,525 Task 13 - Plans, Specifications, and Estimate (35%, 60%, 90%, & Final) 124 364 112 396 364 120 620 132 2232 $ 521,120 -$ -$ -$ 33,550$ 67,100$ 621,770 -$ $

13.1 Roadway Improvement Plan Preparation 80 300 300 500 40 1220 $ 283,980 -$ -$ -$ -$ $ 283,980

13.2 Storm Drain and Culvert Plan -$ -$ -$ -$ 67,100$ $ 67,100

13.3 Signing & Striping Plans 40 80 120 240 $ 54,640 -$ -$ -$ -$ $ 54,640

13.4 Traffic Signal Plans 8 40 300 348 $ 86,416 -$ -$ -$ -$ $ 86,416

13.5 Street Light Plans 8 24 120 8 160 $ 32,528 -$ -$ 33,550$ -$ $ 66,078

13.6 Not Used

13.7 Specifications and Bid Documents 16 40 24 60 140 $ 33,844 -$ -$ -$ -$ $ 33,844

13.8 Cost Estimate 12 24 8 16 40 24 124 $ 29,712 -$ -$ -$ -$ $ 29,712 Task 14 - Utility Coordination (T&M) 20 48 16 40 4 8 16 152 $ 34,912 $38,804 $42,684 $86,981 $ - $ - $ - $ 164,577

14.1 Utility Conflict Mapping/Utility Relocation Coordination and Agrements 16 40 40 96 $ 38,804$ 42,684$ 20,192 -$ -$ -$ $ 62,876

14.2 Utility Potholing 4 8 16 4 8 16 56 $ 14,720 -$ 86,981$ -$ -$ $ 101,701 Task 15 - Right-of-Way 8 24 28 8 40 259 7 16 390 $ 102,600 $ - $ - $ - $ - $ - $ 19,257 $ 121,857

15.1 Title Reports 4 47 7 22 $ 4,691 -$ -$ -$ -$ 14,950 $ $ 19,641

15.2 Record of Survey 4 4 8 1 13 88 16 134 $ 36,500 -$ -$ -$ -$ 4,307 $ $ 40,807

15.3 Legal Descriptions & Plats 4 16 16 27 171 234 $ 61,409 -$ -$ -$ -$ $ 61,409

PHASE C - BIDDING AND CONSTRUCTION SUPPORT (T&M)
Task 16 - Bidding Support Services (T&M) 8 8 16 8 40 $ 10,736 $ - $ - $ - $ - $ - $ - $ 10,736

16.1 Bidding Support Services 8816 8 40 $ 10,736 -$ -$ -$ -$ $ 10,736 Task 17 - Construction Support Services (T&M) 40 12 4 12 44 24 16 152 $ 36,988 $ - $ - $ - $ - $ - $ - $ 36,988

17.1 Pre-Construction Meetings 44 4 4 16 $ 3,960 -$ -$ -$ -$ $ 3,960

17.2 Response to RFIs 16 40 4 60 $ 14,324 -$ -$ -$ -$ $ 14,324

17.3 Review Contractor Change Orders 16 12 8 36 $ 9,872 -$ -$ -$ -$ $ 9,872

17.4 Final Record Drawings 4 12 24 40 $ 8,832 -$ -$ -$ -$ $ 8,832 Total 364 376 148 408 552 120 660 364 88 13 41 259 13 18 7 58 3489 $ 839,133 $38,804 $42,684 $86,981 $33,550 $67,100 $ 19,417 $ 1,088,865 Warren Road Improvements - Phase 1 - Esplanade Avenue to Stetson Avenue City of Hemet

Page 220 of 248 ends

15.F.

Page 724 of 1050 ends

5 City of Hemet
Warren Road Improvements
FEE

SCHEDULE
Item Description
Dilesh R. Sheth, Principal II Myung G. Choo, Principal I Nicholas R. Lowe, Principal I Son H. Le, Associate III Joy A. Schwiebert, Associate I Wendy N. Albarran, Assistant V Nancy Ochoa, Assistant V Deborah A. Saulina, Assistant III Joseph C. Caldwell, Principal
II Eric Hays, Principal I Jason Ardery, Principal II Michael E. Johnson, Principal II Jon Ros, Senior II Andres Lopez, Senior II Jordan T. Moretti, Associate I Andrew Simpson, Project Coordinator 2-Man Survey Party
Total HoursWEBB- LaborMark ThomasMonumentUltra EngineeringVisual Concepts IncJLCPacrailExpenses Total/task1
Billout Rate $ 312 298$ 298$ 240$ $ 196$ 217 196$ 163$ 312$ $ 312$ 312$ 298 $ 267$ 217$ 141$ 326$ 267

PHASE B - PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E)
Task 11 - Final Plans, Specifications, & Cost Estimate Project Management / Administration (Phase B only) (T&M) 100 4 40 40 80 264 $ 71,432 $ - $ - $ - $ - $ - $ - $ - $ 71,432

11.1 Project Management 40 40 80 $ 24,400 $ - $ - $ - $ - $ - $ - $ 24,400

11.2 Meetings and Schedule 40 20 20 40 120 $ 32,000 $ - $ - $ - $ - $ - $ - $ 32,000

11.3 Coordination with Sub-consultants and Agencies 20 4 20 20 64 $ 15,032 $ - $ - $ - $ - $ - $ - $ 15,032 Task 12 - Field Topographic Survey 1 1 7 18 36 63 $ 18,135 $ - $ - $ - $ - $ - $ - $ - $ 18,135

12.1 Supplemental Field Topographic Survey 1 1 7 18 36 63 $ 18,135 $ - $ - $ - $ - $ - $ - $ 18,135 Task 13 - Plans, Specifications, and Estimate (35%, 60%, 90%, & Final) 96 168 32 136 206 150 260 84 40 96 1268 $ 302,034 $ 118,259 -$ -$ 22,275$ 49,500$ 16,500$ -$ 508,568 $

13.1 Roadway Improvement Plan Preparation 40 100 150 150 440 $ 104,230 $ 64,086 $ - $ - $ - $ - $ 16,500 $ 184,816

13.2 Storm Drain and Culvert Plan 4 40 96 140 $ 42,280 $ - $ - $ - $ - $ 49,500 $ - $ 91,780

13.3 Signing & Striping Plans $ - $ 54,173 $ - $ - $ - $ - $ - $ 54,173

13.4 Traffic Signal Plans 24 120 180 324 $ 71,568 $ - $ - $ - $ - $ - $ - $ 71,568

13.5 Street Light Plans 4 16 80 100 $ 20,400 $ - $ - $ - $ 22,275 $ - $ - $ 42,675

13.6 Not Used

13.7 Specifications and Bid Documents 16 40 24 60 140 $ 33,844 $ - $ - $ - $ - $ - $ - $ 33,844

13.8 Cost Estimate 12 24 8 16 40 24 124 $ 29,712 $ - $ - $ - $ - $ - $ - $ 29,712 Task 14 - Utility Coordination 12 26 28 20 4 4 8 102 $ 23,058 $ - $50,646 $43,491 $ - $ - $ - $ - $ 117,195

14.1 Utility Conflict Mapping/Utility Relocation Coordination and Agrements 8 20 20 20 68 $ 14,016 -$ 50,646$ -$ -$ -$ -$ $ 64,662

14.2 Utility Potholing 4 6 8 4 4 8 34 $ 9,042 $ - $ - $ 43,491 $ - $ - $ - $ 52,533 Task 15 - Right-of-Way 8 20 24 9 48 321 8 16 454 $ 120,583 $ - $ - $ - $ - $ - $ - $23,007 $ 143,590

15.1 Title Reports 4 4 8 8 24 $ 5,144 $ - $ - $ - $ - $ - $ - $ 18,400 $ 23,544

15.2 Record of Survey 4 4 8 1 14 97 16 144 $ 39,215 $ - $ - $ - $ - $ - $ - $ 4,607 $ 43,822

15.3 Legal Descriptions & Plats 4 12 12 34 224 286 $ 76,224 $ - $ - $ - $ - $ - $ - $ 76,224

PHASE C - BIDDING AND CONSTRUCTION SUPPORT (T&M)
Task 16 - Bidding Support Services (T&M) 6 8 6 20 $ 4,586 $ - $ - $ - $ - $ - $ - $ - $ 4,586

16.1 Bidding Support Services 6 8 6 20 $ 4,586 $ - $ - $ - $ - $ - $ - $ 4,586 Task 17 - Construction Support Services (T&M) 20 4 4 16 28 12 14 4 102 $ 24,366 $ - $ - $ - $ - $ - $ - $ - $ 24,366

17.1 Pre-Construction Meetings 4 4 4 4 16 $ 4,500 $ - $ - $ - $ - $ - $ - $ 4,500

17.2 Response to RFIs 8 8 24 8 48 $ 10,928 $ - $ - $ - $ - $ - $ - $ 10,928

17.3 Review Contractor Change Orders 4 4 6 14 $ 3,418 $ - $ - $ - $ - $ - $ - $ 3,418

17.4 Final Record Drawings 4 8 12 24 $ 5,520 $ - $ - $ - $ - $ - $ - $ 5,520 Total 242 172 40 152 328 150 300 188 40 180 14 49 321 11 18 8 60 2273 $ 564,194 $ 118,259 $50,646 $43,491 $22,275 $49,500 $16,500 $23,007 $ 887,872 Warren Road Improvements - Phase 2 - Stetson Avenue to Salt Creek Bridge City of Hemet

Page 221 of 248 ends

15.F.

Page 725 of 1050 ends

6 City of Hemet
Warren Road Improvements
FEE

SCHEDULE
Item Description
Dilesh R. Sheth, Principal II Myung G. Choo, Principal I Nicholas R. Lowe, Principal I Son H. Le, Associate III Kawai C. Mang, Associate III Joy A. Schwiebert, Associate I Nancy Ochoa, Assistant V Deborah A. Saulina, Assistant III Joseph C. Caldwell, Principal II Eric Hays, Principal I Jason Ardery, Principal II Michael E. Johnson, Principal II Jon Ros, Senior II Andres Lopez, Senior II Jordan T. Moretti, Associate I Andrew Simpson, Project Coordinator 2-Man Survey Party
Total HoursWEBB- LaborMark ThomasMonumentUltra EngineeringVisual Concepts IncExpenses Total/taskTotal/task1
Billout Rate $ 298$ 298$ 240$ 240$ 312 217$ 196$ 163$ 312$ 298$ 312$ 312$ 267$ 267$ 217$ 141$ 326$

PHASE B -PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E)
Task 11 - Final Plans, Specifications, & Cost Estim Project Management / Administration (T&M) ate 72 44 24 140 $ 36,788 $ 46,675 $ - $ - $ - $ - $ 83,463 $ 83,464

11.1 Project Management 24 12 36 $ 11,064 $ 38,320 -$ -$ -$ $ 49,384 $ 49,384

11.2 Meetings and Schedule 24 20 12 56 $ 14,324 $ 8,356 -$ -$ -$ $ 22,680 $ 22,680

11.3 Coordination with Sub-consultants and Agencies 24 24 48 $ 11,400 $ -$ -$ -$ - $ 11,400 $ 11,400 Task 12 - Field Topographic Survey 4 4 1 1 2 5 4 21 $ 5,447 $ - $ - $ - $ - $ - $ 5,447 $ 5,447

12.1 Supplemental Field Topographic Survey 4 4 11 25 4 21 $ 5,447 $ -$ -$ -$ - $ 5,447 $ 5,447 Task 13 - Plans, Specifications, and Estimate (35%, 60%, 90%, & Final) 44 56 20 60 100 20 64 52 24 60 500 $ 125,504 $ 527,366 -$ -$ 7,150$ -$ 660,020 $ $ 660,021

13.1 Roadway Improvement Plan Preparation 16 24 100 16 156 $ 38,752 $ -$ -$ -$ - $ 38,752 $ 38,752

13.2 Storm Drain and Culvert Plan 8 24 60 92 $ 27,752 $ -$ -$ -$ - $ 27,752 $ 27,752

13.3 Signing & Striping Plans 4 8 16 28 $ 7,472 $ -$ -$ -$ - $ 7,472 $ 7,472

13.4 Traffic Signal Plans 4 8 40 40 92 $ 21,072 $ 41,523 -$ -$ -$ $ 62,595 $ 62,595

13.5 Street Light Plans 4 8 24 4 40 $ 8,340 $ -$ -$ 7,150$ - $ 15,490 $ 15,490

13.6 Bridge Improvement Plans
Type Selection Report $ 44,722 - $ -$ -$ -$ $ 44,722 $ 44,722 Bridge Improvement Plans $ 384,120 - $ -$ -$ -$ $ 384,120 $ 384,120

13.7 Specifications and Bid Documents 8 16 16 40 $ 9,872 $ 28,996 -$ -$ -$ $ 38,868 $ 38,868

13.8 Cost Estimate 8 8 4 4 12 16 52 $ 12,244 $ 28,006 -$ -$ -$ $ 40,250 $ 40,250 Task 14 - Utility Coordination 8 8 12 2 4 8 42 $ 10,488 $ 11,814 $20,409 $14,497 $ - $ - $ 42,711 $ 42,711

14.1 Utility Conflict Mapping/Utility Relocation Coordination and Agrements 4 88 20 $ 4,288 $ 20,409$ 11,814 -$ -$ $ 36,511 $ 36,511

14.2 Utility Potholing 4 4248 22 $ 6,200 $ -$ 14,497$ - -$ $ 6,200 $ 6,200 Task 15 - Right-of-Way 4 16 20 2 15 56 1 4 118 $ 29,681 $ - $ - $ - $ - $ 2,403 $ 32,084 $ 32,084

15.1 Title Reports 44 1 1 10 $ 1,973 $ -$ -$ -$ 1,150$ - $ 3,123 $ 3,123

15.2 Record of Survey 2 4 8 1 6 36 4 61 $ 15,896 $ -$ -$ -$ 1,253$ - $ 17,149 $ 17,149

15.3 Legal Descriptions & Plats 2 88 9 20 47 $ 11,812 $ -$ -$ -$ - $ 11,812 $ 11,812

PHASE C - BIDDING AND CONSTRUCTION SUPPORT (T&M)
Task 16 - Bidding Support Services (T&M) 8 8 16 $ 4,232 $ 18,383 $ - $ - $ - $ - $ 22,615 $ 22,615

16.1 Bidding Support Services 8 8 16 $ 4,232 $ 18,383 -$ -$ -$ $ 22,615 $ 22,615 Task 17 - Construction Support Services (T&M) 14 4 6 12 8 8 4 56 $ 13,668 $ 59,704 $ - $ - $ - $ - $ 73,372 $ 73,372

17.1 Pre-Construction Meetings 4 4 44 16 $ 3,960 $ 3,458 -$ -$ -$ $ 7,418 $ 7,418

17.2 Response to RFIs 4 844 20 $ 4,828 $ 27,610 -$ -$ -$ $ 32,438 $ 32,438

17.3 Review Contractor Change Orders 4 4 $ 1,248 $ 11,942 -$ -$ -$ $ 13,190 $ 13,190

17.4 Final Record Drawings 2 68 16 $ 3,632 $ 16,694 -$ -$ -$ $ 20,326 $ 20,326 Total 154 56 24 66 100 64 72 140 24 88 5 16 56 6 5 1 16 893 $ 225,808 $ 663,942 $20,409 $14,497 $ 7,150 $ 2,403 $ 919,713 $ 919,714 Warren Road Improvements - Phase 3 - Salt Creek Bridge Widening City of Hemet

Page 222 of 248 ends

15.F.

Page 726 of 1050 ends

00091740.2

PROFESSIONAL SERVICES AGREEMENT

BY AND BETWEEN

THE CITY OF HEMET

A CALIFORNIA MUNICIPAL CORPORATION
AND
TKE ENGINEERING, INC.

A CALIFORNIA CORPORATION
AGREEMENT # 2025-072

Page 223 of 248 ends

15.F.

Page 727 of 1050 ends

PROFESSIONAL SERVICES AGREEMENT

FOR PROFESSIONAL ENGINEERING SERVICES FOR WARREN ROAD IMPROVEMENTS BETWEEN THE CITY OF HEMET AND TKE ENGINEERING, INC.

THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is made and entered into this 26th day of March, 2025 (“Effective Date”), by and between the CITY OF HEMET (“City”), a California municipal corporation and TKE Engineering, Inc., a California corporation (“Consultant”). For the purposes of this Agreement City and Consultant are sometimes hereinafter referred to as “Party” and hereinafter collectively referred to as the “Parties.”

RECITALS

1. City has sought by request for proposals the performance of the Professional Engineering Services for Warren Road Improvements defined and described particularly in Section 2, “Scope of Services and Schedule of Performance” of this Agreement.

2. Consultant was selected by City to perform those services.

3. Consultant was selected by City on the basis of Consultant’s demonstrated competence and the professional qualifications necessary for the satisfactory performance of the services required.

4. City has authority to enter into this Agreement and the City Manager has authority to execute this Agreement.

5. The Parties desire to formalize the selection of Consultant for performance of those services defined and described particularly in Section 2 “Scope of Services” of this Agreement and desire that the terms of that performance be as particularly defined and described herein.

OPERATIVE PROVISIONS
NOW, THEREFORE, for and in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the Parties agree as follows:

SECTION 1. TERM OF AGREEMENT
Subject to the provisions of Section 21 "Termination of Agreement" of this Agreement, the Term of this Agreement is through June 30, 2026, commencing on the Effective Date, unless otherwise extended by written agreement of the Parties.

Page 224 of 248 ends

15.F.

Page 728 of 1050 ends

00092061.2
(a) The City Manager may, in his or her sole discretion, unilaterally exercise an option to extend the Agreement on a month-to-month basis following expiration on the same terms and conditions, including compensation as set forth in Section 4 “Compensation.” (b) Consultant acknowledges that the Agreement term may extend over multiple City fiscal years, and that the work and compensation under this Agreement is contingent on the City Council appropriating funding for and authorizing such work and compensation for those fiscal years. This Agreement may be terminated by the City Manager at the end of a fiscal year when sufficient funding is not appropriated and authorized for the subsequent fiscal year. City is not obligated to pay Consultant for any amounts not duly appropriated and authorized by the City Council.

SECTION 2. SCOPE OF SERVICES
Subject to this Agreement, all addendums and exhibits attached and incorporated hereto, Consultant agrees to perform the services and tasks set forth in Exhibit “A,” “Scope of Services” (hereinafter, the “Services”), and the City agrees to retain and does hereby retain Consultant for the Services.

SECTION 3. ADDITIONAL SERVICES
Consultant shall not be compensated for any work rendered in connection with its performance of this Agreement that is in addition to or outside of the Services unless such additional services are authorized in advance and in writing in accordance with Section 25 “Administration and Implementation” or Section 27 “Amendment” of this Agreement. If and when such additional work is authorized, such additional work shall be deemed to be part of the Services.

SECTION 4. COMPENSATION
(a) Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in Exhibit “B” “Compensation” and made a part of this Agreement by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed One Million Eight Hundred and Thirty-Six Thousand Eight Hundred and Twenty-Eight Dollars ($1,836,828.00) (“Not to Exceed Amount”) unless additional compensation is approved in writing in accordance with Section 25 “Administration and Implementation” or Section 27 “Amendment” of this Agreement. (b) All City vendors and consultants receiving new contracts, contract renewals, or contract extensions must sign up to receive electronic payments through the City's Automated Clearing House (ACH) payments service/provider. Electronic payments are processed biweekly and are safe and secure. To enroll in ACH electronic payments contact

Page 225 of 248 ends

15.F.

Page 729 of 1050 ends

00092061.2
[email protected].
(c) Payment to Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant. (d) If this Agreement is extended pursuant to Section 1 “Term of Agreement,” the City shall pay the same rates specified in Exhibit “B” “Compensation.” SECTION 5. METHOD OF PAYMENT AND INVOICING
(a) Payment shall be made in accordance with City’s usual accounting procedures upon receipt and approval of an itemized invoice setting forth the services performed. The invoices shall be emailed to [email protected]. Under no circumstances shall the total amount paid to Consultant under this Agreement exceed the City Manager’s authority without approval by the City Council.
(b) Consultant shall submit within 30 days of the end of each month a complete and accurate written itemized invoice for services performed and/or goods provided. The invoice must be in a format approved by City. In order to receive payment, Consultant shall submit to City an itemized invoice, on a monthly basis, for services performed pursuant to this Agreement. Each itemized invoice shall identify at the top of the first page, the Not to Exceed Amount (as set by Section 4(a) above), the total amount billed to date, the services rendered during the billing period, and the amount due for the statement invoice for which reimbursement is sought in the statement invoice. The invoice shall detail charges by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and sub consultant contracts. Sub consultant charges shall be detailed by the following categories: labor, travel, materials, equipment and supplies. If the compensation set forth in Section 4(a) and Exhibit “B” include payment of labor on an hourly basis (as opposed to labor and materials being paid as a lump sum), the labor category in each invoice shall include detailed descriptions of tasks performed and the amount of time incurred for or allocated to that task. City shall independently review each invoice submitted by the Consultant to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. In the event that no charges or expenses are disputed, the invoice shall be approved and paid according to the terms set forth in subsection (c). In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission.
(c) Except as to any charges for work performed or expenses incurred by Consultant which are disputed by City, City will use its best efforts to cause Consultant to be paid within forty-five (45) days of receipt of Consultant’s correct and undisputed invoice. (d) The Parties estimate that performance of this Agreement will be accomplished without an increase in the Not to Exceed Amount. Consultant shall notify the City in writing

Page 226 of 248 ends

15.F.

Page 730 of 1050 ends

00092061.2
whenever it has reason to believe that the costs the Consultant expects to incur under this Agreement in the following sixty (60) days, when added to all costs previously incurred, will exceed eighty percent (80%) of the Not to Exceed Amount specified herein. As part of the notification, the Consultant shall provide the City with a revised estimate of the total cost of performing this Agreement.

SECTION 6. INSPECTION AND FINAL ACCEPTANCE
City may inspect and accept or reject any of Consultant’s work under this Agreement, either during performance or when completed. City shall reject or finally accept Consultant’s work within sixty (60) days after submitted to City. City shall reject work by a timely written explanation, otherwise, Consultant’s work shall be deemed to have been accepted. City’s acceptance shall be conclusive as to such work except with respect to latent defects, fraud, and such gross mistakes as amount to fraud. Acceptance of any of Consultant’s work by City shall not constitute a waiver of any of the provisions of this Agreement including, but not limited to, Section 17 “Indemnification” and Section 18 “Insurance.” SECTION 7. OWNERSHIP OF DOCUMENTS
All original maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files and other documents prepared, developed, or discovered by Consultant in the course of providing the Services pursuant to this Agreement shall become the sole property of City and may be used, reused or otherwise disposed of by City without the permission of the Consultant. Upon completion, expiration, or termination of this Agreement, Consultant shall turn over to City all such original maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files, and other documents.

If and to the extent that City utilizes for any purpose not related to this Agreement any maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files, or other documents prepared, developed, or discovered by Consultant in the course of providing the Services pursuant to this Agreement, Consultant’s guarantees and warranties in Section 11 “Standard of Performance” of this Agreement shall not extend to such use of the maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files or other documents.

SECTION 8. INTELLECTUAL PROPERTY RIGHTS ASSIGNMENT
For no additional compensation, Consultant hereby assigns to City all of Consultant’s rights, title, and interest in and to the content of all deliverable materials created by Consultant or its employees, agents, or sub consultants, including copyrights, in connection with the Services performed under this Agreement. Consultant shall promptly execute and deliver and shall cause its employees, agents, and sub consultants to promptly execute and deliver, upon request by the City or any of its successors or assigns at any time and without further compensation of any kind, any power of attorney, assignment, application for copyright, patent, trademark or other

Page 227 of 248 ends

15.F.

Page 731 of 1050 ends

00092061.2
intellectual property right protection, or other papers or instruments which may be necessary or desirable to fully secure, perfect or otherwise protect to or for the City, its successors, and assigns, all right, title and interest in and to the content of the deliverable materials. For purposes of this section deliverable materials include all works, tangible or not, created under this Agreement including, without limitation, documents, material, data, reports, manuals, specifications, artwork, drawings, sketches, computer programs and databases, schematics, photographs, video and audiovisual recordings, sound recordings, marks, logos, graphic designs, notes, website, domain names, inventions, processes, formulas matters and combinations thereof, and all forms of intellectual property. The provisions of this paragraph are binding on the successors, assigns and heirs of Consultant and shall survive the termination of Consultant’s Services under this Agreement.

SECTION 9. CONSULTANT’S BOOKS AND RECORDS
(a) Consultant shall maintain any and all documents and records demonstrating or relating to Consultant’s performance of the Services. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, or other documents or records evidencing or relating to work, services, expenditures, and disbursements charged to City pursuant to this Agreement. Any and all such documents or records shall be maintained in accordance with generally accepted accounting principles and shall be sufficiently complete and detailed so as to permit an accurate evaluation of the Services provided by Consultant pursuant to this Agreement. Any and all such documents or records shall be maintained for three (3) years from the date of execution of this Agreement and to the extent required by laws relating to audits of public agencies and their expenditures. (b) Any and all records or documents required to be maintained pursuant to this section shall be made available for inspection, audit, and copying, at any time during regular business hours, upon request by City or its designated representative. Copies of such documents or records shall be provided directly to the City for inspection, audit and copying when it is practical to do so; otherwise, unless an alternative is mutually agreed upon, such documents and records shall be made available at Consultant’s address indicated for receipt of notices, “Section 23,” of this Agreement.
(c) Where City has reason to believe that any of the documents or records required to be maintained pursuant to this section may be lost or discarded due to dissolution or termination of Consultant’s business, City may, by written request, require that custody of such documents or records be given to the City. Access to such documents and records shall be granted to City, as well as to its successors in interest and authorized representatives.

SECTION 10. INDEPENDENT CONTRACTOR

Page 228 of 248 ends

15.F.

Page 732 of 1050 ends

00092061.2
(a) Consultant is and shall at all times remain a wholly independent contractor and not an officer, employee, or agent of City. Consultant shall have no authority to bind City in any manner, nor to incur any obligation, debt, or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. (b) The personnel performing the Services under this Agreement on behalf of Consultant shall at all times be under Consultant’s exclusive direction and control. Neither City, nor any elected or appointed boards, officers, officials, employees or agents of City, shall have control over the conduct of Consultant or any of Consultant’s officers, employees, sub consultants or agents except as set forth in this Agreement. Consultant shall not at any time or in any manner represent that Consultant or any of Consultant’s officers, employees, or agents are in any manner officials, officers, employees or agents of City. (c) Neither Consultant, nor any of Consultant’s officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Consultant expressly waives any claim Consultant may have to any such rights.

SECTION 11. STANDARD OF PERFORMANCE
Consultant represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the Services required under this Agreement in a thorough, competent, and professional manner. Consultant shall at all times faithfully, competently, and to the best of its ability, experience, and talent, perform all Services. In meeting its obligations under this Agreement, Consultant shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing services similar to the Services required of Consultant under this Agreement, and shall use such skill, prudence, and diligence as other members of Consultant’s profession commonly possess and exercise. In addition to the general standards of performance set forth in this section, additional specific standards of performance and performance criteria may be set forth in Exhibit “A” “Scope of Services” that shall also be applicable to Consultant’s work under this Agreement. Where there is a conflict between a general and a specific standard of performance or performance criteria, the specific standard or criteria shall prevail over the general.

SECTION 12. COMPLIANCE WITH APPLICABLE LAWS; PERMITS AND LICENSES Consultant shall keep itself informed of and comply with all applicable federal, state, and local laws, statutes, codes, ordinances, regulations, and rules in effect during the term of this Agreement. Consultant shall at all times observe and comply with all such laws, ordinances, and regulations, and shall be solely responsible for any failure to comply with all applicable laws, ordinances, and regulations. Consultant represents and warrants that Consultant has obtained or shall promptly obtain all necessary licenses to perform the Services set forth in this Agreement

Page 229 of 248 ends

15.F.

Page 733 of 1050 ends

00092061.2
and that such licenses are in good standing, including but not limited to obtaining a City business license. Consultant further represents and warrants that the services provided herein shall conform to all ordinances, policies, and practices of the City. Neither City nor any elected or appointed boards, officers, officials, employees or agents of City, shall be liable, at law or in equity, as a result of any failure of Consultant to comply with this section.

SECTION 13. PREVAILING WAGE LAWS
Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. To the extent applicable, Consultant shall defend, indemnify, and hold the City, its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure of Consultant to comply with the Prevailing Wage Laws.

SECTION 14. NONDISCRIMINATION
Consultant and subconsultants shall not unlawfully discriminate, harass, or allow harassment against any person because of sex, sexual orientation, gender, gender identity, gender expression, reproductive health decision-making, race, color, religious creed, marital status, ancestry, national origin, medical condition, genetic information, age, disability (mental and physical), or military or veteran status in connection with or related to the performance of this Agreement. Consultant and subconsultants shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code, § 12900 et seq.) and the applicable regulations promulgated thereunder (Cal. Code of Regs, tit. 2, § 7285.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code, § 12990 (a)-(f), are incorporated into this Agreement by reference and made a part hereof as set for in full (Cal. Code of Regs, tit. 2, § 7285.0, et seq.). Consultant shall include the non-discrimination and compliance provisions of this section in all subcontracts to perform work under this Agreement.

SECTION 15. CONFLICTS OF INTEREST
(a) Consultant covenants that neither it nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Consultant’s performance of the Services. Consultant further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the City Manager. Consultant agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement.

Page 230 of 248 ends

15.F.

Page 734 of 1050 ends

00092061.2
(b) City understands and acknowledges that Consultant is, as of the date of execution of this Agreement, independently involved in the performance of non-related services for other governmental agencies and private parties. Consultant is unaware of any stated position of City relative to such projects. Any future position of City on such projects shall not be considered a conflict of interest for the purposes of this section. (c) City understands and acknowledges that Consultant will, perform non-related services for other governmental agencies and private parties following the completion of the Services under this Agreement. Any such future service shall not be considered a conflict of interest for purposes of this section.

SECTION 16. CONFIDENTIAL INFORMATION; RELEASE OF INFORMATION (a) All information gained or work product produced by Consultant in performance of this Agreement shall be considered confidential unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the City Manager, except as may be required by law. (b) Consultant, its officers, employees, agents, or sub consultants, shall not, without prior written authorization from the City Manager or unless requested by the City Attorney of City, voluntarily provide declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered "voluntary" provided Consultant gives City notice of such court order or subpoena. (c) If Consultant, or any officer, employee, agent, or sub consultant of Consultant, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Consultant for any damages, costs, and fees, including attorney’s fees, caused by or incurred as a result of Consultant’s conduct. (d) Consultant shall promptly notify City should Consultant, its officers, employees, agents, or sub consultants be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed thereunder. City retains the right but has no obligation, to represent Consultant or be present at any deposition, hearing, or similar proceeding. Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant. However, this right to review any such response does not imply or mean the right of City to control, direct, or rewrite said response.

Page 231 of 248 ends

15.F.

Page 735 of 1050 ends

00092061.2
SECTION 17. INDEMNIFICATION
(a) To the fullest extent permitted by law, Consultant shall indemnify, protect, defend (with legal counsel reasonably selected by the City) and hold harmless City and any and all of its elected and appointed officials, officers, employees, representatives and agents (“Indemnified Parties”) from and against any and all claims, actions and proceedings (whether at law or equity, administrative or judicial), demands, orders, judgments, losses, injuries (including, without limitation, injury to or death of an employee of Consultant or sub consultants), liabilities of every kind (including, without limitation, incidental and consequential damages, court costs, and litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and cost of investigation), damages, costs and expenses, including attorney’s fees and costs, (collectively "Claims") that arise out of, pertain to, or relate to, directly or indirectly, in whole or in part, performance of Services by Consultant, its officers, agents, employees, representatives, sub consultants, anyone directly or indirectly employed by any of them, or anyone that they control. Consultant’s duty to indemnify, protect, defend, and hold harmless Indemnified Parties, shall not include any Claims arising from the sole negligence or willful misconduct of the Indemnified Parties. (b) Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this section from each and every sub consultant, subcontractor, or any other person or entity involved by, for, with, or on behalf of Consultant in the performance of this Agreement naming the Indemnified Parties as additional indemnitees. In the event Consultant fails to obtain such indemnity obligations from others as required here, Consultant agrees to be fully responsible according to the terms of this section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth herein is binding on the successors, assigns, or heirs of Consultant and shall survive the termination of this Agreement and this section.

SECTION 18. INSURANCE
Consultant agrees to obtain and maintain in full force and effect during the Term of this Agreement the insurance policies set forth in Exhibit “C” “Insurance” and made a part of this Agreement. All insurance policies shall be subject to approval by City as to form and content.

These requirements are subject to amendment or waiver if so approved in writing by the City Manager. Consultant agrees to provide City with copies of required policies upon request.

SECTION 19. ASSIGNMENT
The expertise and experience of Consultant are material considerations for this Agreement. City has an interest in the qualifications and capability of the persons and entities

Page 232 of 248 ends

15.F.

Page 736 of 1050 ends

00092061.2
who will fulfill the duties and obligations imposed upon Consultant under this Agreement. In recognition of that interest, Consultant shall not assign or transfer this Agreement or any portion of this Agreement or the performance of any of Consultant’s duties or obligations under this Agreement without the prior written consent of the City, which may be given in the sole and absolute discretion of the City Manager. Any attempted assignment shall be ineffective, null, and void, and shall constitute a material breach of this Agreement entitling City to any and all remedies at law or in equity, including termination of this Agreement pursuant to Section 21 “Termination of Agreement.” City acknowledges, however, that Consultant, in the performance of its duties pursuant to this Agreement, may utilize sub consultants.

If in the performance of its duties Consultant utilizes sub consultants or subcontractors, Consultant covenants that subcontracts, if any, shall contain a provision making sub consultants or subcontractors subject to all provisions stipulated in this Agreement, including without limitation, the insurance obligations set forth in Section 18 “Insurance.” The Consultant acknowledges and agrees that the City is an intended beneficiary of any work performed by any sub consultant or subcontractor for purposes of establishing a duty of care between any sub consultant or subcontractor and the City.

SECTION 20. CONTINUITY OF PERSONNEL
Consultant shall make every reasonable effort to maintain the stability and continuity of Consultant’s staff and subcontractors / sub consultants, if any, assigned to perform the Services.

Consultant shall notify City of any changes in Consultant’s staff and subcontractors/sub consultants, if any, assigned to perform the Services prior to and during any such performance.

SECTION 21. TERMINATION OF AGREEMENT
(a) City may terminate this Agreement in its sole and absolute discretion, with or without cause, at any time by giving written notice of termination to Consultant. In the event such notice is given, Consultant shall cease immediately all work in progress. (b) Consultant may terminate this Agreement for cause at any time upon thirty (30) days written notice of termination to City.
(c) If either Consultant or City fail to perform any material obligation under this Agreement, then, in addition to any other remedies, either Consultant, or City may terminate this Agreement immediately upon written notice.
(d) Upon termination of this Agreement by either Consultant or City, all property belonging exclusively to City which is in Consultant’s possession shall be returned to City.

Consultant shall furnish to City a final invoice for work performed and expenses incurred by Consultant, prepared as set forth in Section 5 “Method of Payment and Invoicing” of this Agreement. This final invoice shall be reviewed and paid in the same manner as set forth in Section 5 “Method of Payment and Invoicing” of this Agreement.

Page 233 of 248 ends

15.F.

Page 737 of 1050 ends

00092061.2
(e) Upon written notice, City may suspend all or any portion of Consultant’s performance under this Agreement at its sole option and for its convenience for a reasonable period of time not to exceed six (6) months. City will pay to Consultant a sum equivalent to the reasonable value of the services satisfactorily provided up to the date of suspension. City may rescind the suspension prior to or at six (6) months by providing Consultant with written notice of the rescission, at which time Consultant would be required to resume performance in compliance with the terms and provisions of this Agreement. Consultant will be entitled to an extension of time to complete performance under this Agreement equal to the length of the suspension unless otherwise agreed to in writing by the Parties.

SECTION 22. EXCUSABLE DELAYS
Neither Party shall be liable for damages, including liquidated damages, if any, caused by delay in performance or failure to perform due to causes beyond the control of either Party. Such causes include, but are not limited to, acts of God, acts of the public enemy, acts of federal, state or local governments, acts of City, court orders, fires, floods, epidemics, strikes, embargoes, and unusually severe weather. The term and price of this Agreement shall be equitably adjusted for any delays due to such causes.

SECTION 23. NOTICES.

All notices required or permitted to be given under this Agreement shall be in writing and shall be personally delivered, or sent by telecopier or certified mail, postage prepaid and return receipt requested, addressed as follows:

To City: City of Hemet
Attn: City Manager
445 E. Florida Ave.

Hemet, CA 92543
To Consultant: TKE Engineering, Inc.

Attn: Terry Renner
2305 Chicago Ave.

Riverside, CA 92507
Notice shall be deemed effective on the date personally delivered or transmitted by facsimile or, if mailed, three (3) days after deposit of the same in the custody of the United States Postal Service.

Page 234 of 248 ends

15.F.

Page 738 of 1050 ends

00092061.2
SECTION 24. AUTHORITY TO EXECUTE.

The person or persons executing this Agreement on behalf of Consultant represents and warrants that he/she/they has/have the authority to so execute this Agreement and to bind Consultant to the performance of its obligations hereunder.

SECTION 25. ADMINISTRATION AND IMPLEMENTATION.

This Agreement shall be administered and executed by the City Manager or his or her designated representative. The City Manager shall have the authority to issue interpretations and to make amendments to this Agreement, including amendments that commit additional funds, consistent with Section 27 “Amendment” and the City Manager’s contracting authority under the Hemet Municipal Code.

SECTION 26. BINDING EFFECT.

This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the Parties.

SECTION 27. AMENDMENT.

No amendment to or modification of this Agreement shall be valid unless made in writing and approved by Consultant and by City. The City Manager shall have the authority to approve any amendment to this Agreement if the total compensation under this Agreement, as amended, would not exceed the City Manager’s contracting authority. All other amendments shall be approved by the City Council. The Parties agree that the requirement for written modifications cannot be waived and that any attempted waiver shall be void.

SECTION 28. WAIVER.

Waiver by any Party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any Party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision nor a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any work or services by Consultant shall not constitute a waiver of any of the provisions of this Agreement.

SECTION 29. LAW TO GOVERN; VENUE.

This Agreement shall be interpreted, construed and governed according to the laws of the State of California. In the event of litigation between the Parties, venue in state trial courts shall lie exclusively in the County of Riverside, California. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in Riverside.

Page 235 of 248 ends

15.F.

Page 739 of 1050 ends

00092061.2
SECTION 30. ATTORNEY’S FEES, COSTS AND EXPENSES.

In the event litigation or other proceeding is required to enforce or interpret any provision of this Agreement, the prevailing Party in such litigation or other proceeding shall be entitled to an award of reasonable attorney’s fees, costs and expenses, in addition to any other relief to which it may be entitled.

SECTION 31. ENTIRE AGREEMENT.

This Agreement, including the attached exhibits and addendums, along with any amendments thereto, is the entire, complete, final and exclusive expression of the Parties with respect to the matters addressed therein and supersedes all other agreements or understandings, whether oral or written, or entered into between Consultant and City prior to the execution of this Agreement. No statements, representations or other agreements, whether oral or written, made by any Party which are not embodied herein shall be valid and binding.

SECTION 32. SEVERABILITY.

If any term, condition or covenant of this Agreement is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall not be affected thereby and the Agreement shall be read and construed without the invalid, void or unenforceable provision(s).

SECTION 33. INCORPORATION AND CONFLICTING TERMS.
(a) The following documents are incorporated and made part of this Agreement by this reference:

1. All exhibits and addendums

2. All amendments

3. Consultant’s proposal, if any

4. Any laws, regulations, requirements, or restrictions, applicable to the funding source used by City to pay Consultant for any portion of work done under Agreement (“Funding Restrictions”)
(b) The documents listed above shall be referred to collectively as the “Agreement Documents.” The Agreement Documents are intended to be complementary, and a requirement in one Document is effective as if it appeared in all the Documents. In the event of a conflict between any of the Agreement Documents, the Documents shall be given effect in the following order: Funding Restrictions, Amendments (most recent first), this Agreement, Insurance requirements, exhibits and addendums, and Consultant’s proposal. Where the requirements of one Document are more stringent then another the more stringent shall govern.

Page 236 of 248 ends

15.F.

Page 740 of 1050 ends

00092061.2
SECTION 34. TIME OF THE ESSENCE.

Time is of the essence for each and every provision of this Agreement. [SIGNATURE PAGE FOLLOWS]

Page 237 of 248 ends

15.F.

Page 741 of 1050 ends

00091740.2
Signature Page

PROFESSIONAL SERVICES AGREEMENT

FOR PROFESSIONAL ENGINEERING SERVICES FOR WARREN ROAD IMPROVEMENTS BETWEEN THE CITY OF HEMET AND TKE ENGINEERING, INC.

IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on the date and year first-above written.

CITY OF HEMET
___________________________
Mark Prestwich
City Manager
ATTEST:

CITY CLERK
By: ___________________________
APPROVED AS TO FORM:

CITY ATTORNEY
By: ____________________________

CONSULTANT
By:

Its:

Page 238 of 248 ends

15.F.

Page 742 of 1050 ends

00091740.2
Exhibit A – Scope of Services
Page | 1
EXHIBIT “A”

SCOPE OF SERVICES
TASK NO. 1 PROJECT MANAGEMENT
TKE’s Project Manager will be responsible for the entire project team. He will attend all meetings, prepare agendas and corresponding meeting minutes together with collection of signatures for meeting attendees (sign-in sheets). He will meet with the City at appropriate times and will meet as needed with agencies, residents, property owners, and utilities in addition to the meetings presented below. He will also update the project budget and schedule prior to each City meeting for discussion with staff.

TASK NO. 2 INITIAL ‘KICK-OFF’ MEETING
Prior to commencement of services, we propose to meet City staff to review project obligations and to discuss all project requirements in detail. TKE’s Project Manager and \Engineer will attend the meeting to determine project protocol and obtain City record drawings.

TASK NO. 3 RECORDS RESEARCH
We will thoroughly research existing utility records and acquire copies of all available records.

The purpose of the records research is to assemble survey records to establish locations of street centerlines, street rights-of-way, and easements and determine locations of all existing utilities and improvements. The research will consist of assembling copies of assessors’ maps, tract maps, parcel maps, easement documents, monument ties, benchmark data, corner records, street and storm drain improvement plans, and utility drawings. We will request the City provide copies of available pertinent City records, such as survey ties, benchmarks, and street, sewer and storm drain improvement plans.

We will notify Underground Service Alert to acquire a complete list of underground utility purveyors. The utility drawings will include existing drawings from the City, and drawings and/or atlas maps from all private utility companies, and/or agencies. We will confer and coordinate with the following agencies as well as any additional agencies listed in the Underground Service Alert:

Δ Metropolitan Water District
Δ Caltrans
Δ City of Hemet Water Department
Δ Frontier
Δ AT&T
Δ Sprint
Δ Southern California Gas Co.

Δ Southern California Edison
Δ Spectrum
We will send first utility notice letters to all listed utility companies and agencies requesting their data. We will maintain copies of the letters and correspondence for future reference. We shall also provide the City with a complete copy of all correspondence with all utility companies.

TASK NO.4 DESIGN SURVEY
TKE will conduct a conventional design survey of the sidewalk and ramp construction project areas due to the level of detail needed for precise grading design. Our field survey crews will collect appropriate detail as required to prepare a topographic map for all areas where grading improvements are required. The topographic map shall be a minimum of 120-feet wide and shall extend 100-feet beyond end of centerline. In addition, we will collect 50-foot cross sections with

Page 239 of 248 ends

15.F.

Page 743 of 1050 ends

00091740.2
Exhibit A – Scope of Services
Page | 2
shots extending to right-of-way and 10-feet beyond right-of-way on each side where possible.

Survey data will include trees over 2-inches in diameter, buildings, walkways, sidewalks, driveways, curbs, gutters, cross gutters, fire hydrants, water valves, manholes, water meters, signs, street lights, power poles, fences, structure, traffic signal poles and all other visible features.

Our crews will set 100-foot stationing along street centerlines and collect existing topography as needed to provide sufficient level of detail for precise design. The crew will also measure invert, top of cone and rim elevations for all existing manholes in the project area and invert and rim elevations for all drainage facilities. The crew will set temporary benchmarks within the project limits and each will be shown on the drawings.

TASK NO. 5 TOPOGRAPHIC MAP/SURVEY CONTROL PLAN
We will prepare a topographic map for the entire reach of sidewalk replacement and ramp construction areas. The topographic map shall be prepared in AutoCAD format at 1”=40’ scale and shall include 1 foot contours. For areas of striping improvements only a topographic survey will not be performed
A survey control plan shall be prepared and shall show all existing found monumentation, benchmarks, ties and temporary control points. All found monumentation will include descriptions and tie-out information.

The survey control plan will be provided to the City in hard copy (mylar) and digital (AutoCAD and PDF) formats.

TASK NO. 6 BASE CONSTRUCTION DRAWINGS
We will prepare the base construction drawings on 24” by 36” sheets with the City’s standard title block using AutoCAD 2020 software, at a drawing scale of 1”=40’. The base construction drawings will include a plan view based on the accumulated conventional survey data. We will add the sheet north arrow, graphic scale, existing improvements and utilities (based on both assembled records and field data), property lines, public and private right-of-way, easement areas, assessor parcel numbers, street centerline, street names, building locations, water service location; sewer manhole lids and water valve lids; cross gutters; driveways, pedestrian ramps; traffic stripes and legends; curb returns; details of private improvements, fences, gates, irrigation systems, mailboxes, trees and landscaping, and survey data to the drawings. Once the base drawings are complete, we will perform a careful field review to ensure all underground facilities are shown correctly.

TASK NO. 7 COMPOSITE UTILITY PLAN
TKE will prepare a composite utility plan which identifies all existing utilities within the proposed right-of-way and all utilities affected by the proposed street and traffic signal improvements and requiring relocation. The plan shall show all above and below ground utilities including all laterals. The utility plan will be for City use in coordinating with utility companies.

For all facilities to be potholed, we propose to verify the horizontal and vertical alignments by locating the facilities. We will request that Underground Service Alert (USA) notify USA members to attend a field meeting to review locations to be excavated. We will mark critical utility locations as defined by TKE and approved by City staff in the field.

We will conduct a field meeting to request that utility representatives mark their facilities within specified locations. We will document meeting attendees for future reference. We will retain C Below to excavate each utility. We will measure all utilities that are excavated to record their horizontal and vertical alignments.

TASK NO. 8 GEOTECHNICAL

Page 240 of 248 ends

15.F.

Page 744 of 1050 ends

00091740.2
Exhibit A – Scope of Services
Page | 3
We would propose to retain Aragon Geotechnical Inc. (AGI) as a sub consultant to provide Geotechnical services for the project. AGI will first review historical geotechnical reports. Scope of services includes, mobilization with truck mounted drilling equipment, boring locations/elevations, utility locates, traffic control during drilling, drill and sample borings, Shelby Tube samples or blow counts in all borings at 5-foot intervals, laboratory testing, engineering analysis, and electronic boring logs.

Prior to the field investigation, AGI will prepare a plan showing the proposed boring locations.

The plan will be submitted to the CITY for obtaining an encroachment permit to perform the borings. Traffic control may be necessary when drilling. AGI will follow the CITY traffic control guidelines if required. They will also perform the following:

Δ Drilling, sampling and logging of necessary borings along roadway and below proposed culvert. AGI will notify Underground Service Alert. Borings include, the asphalt pavement thickness and base thickness will be noted during the boring operations.

Δ Design of street structural section using City provided traffic indices.

Δ Laboratory testing of representative soil samples to evaluate in-situ moisture content, density tests, infiltration rates, max density and optimum tests, sieve analysis, R-value, direct shear tests, consolidation and collapse tests and corrosivity characteristics of the on-site soils.

Δ Data compilation and geotechnical analysis of existing geotechnical maps, reports, and field and laboratory data to provide recommendations for pavement design. Analysis will include recommendations for new pavement section alternatives, based on the traffic indices and R-value testing.

Preparation of a report presenting findings, conclusions and recommendations pertaining to design, compaction requirements, subgrade preparation, and earthwork/embankment recommendations. In addition, the report will provide recommendations for asphalt pavement recycling and other recommendations, which would include cost saving treatment methods.

The report will also include
Δ Settlement and slope stability analysis for roadway fill areas and culverts and (updates there to)
Δ Suitability of existing soils to be excavated for reuse as embankment fill TASK NO. 9 PRELIMINARY ENGINEERING
Using the topographic mapping, TKE will prepare preliminary design concepts for geometric alignment that will analyze impacts to adjacent properties and developments, impacts to adjacent streets, conveyance of offsite drainage, street drainage, earthwork, utility relocations, slope and temporary construction easements, traffic impacts, constructability reviews and future street improvements. Preliminary geometric design will be performed to establish ultimate improvements to minimize removals of improvements constructed with future projects. The analysis will include an exhibit identifying potential impacts, mitigation requirements and quantities as appropriate for each item listed above and will include preliminary engineer’s estimate. TKE will attend two meetings for review and approval of the geometric alignment design.

In addition, TKE will prepare hydrology and hydraulic analysis of the project area to determine culvert and/or low water crossing flowrates and size requirements.

TKE will prepare preliminary alignments for all curb, gutter, sidewalk and striping improvements and present the alternatives to the City in a Geometric Alignment Design (GAD).

Page 241 of 248 ends

15.F.

Page 745 of 1050 ends

00091740.2
Exhibit A – Scope of Services
Page | 4
The GAD will be reviewed with City Staff to determine the desired alignments for all improvements and a final approved design will be accepted during this process.

TASK NO. 10 RIGHT-OF-WAY
After 30% design is complete, we will prepare and maintain a right-of-way acquisition map and will update it as right-of-way progresses. The map will show all required rights-of-way for project construction. The map will be prepared on a 24” by 36” sheet with City Standard title block at an appropriate drawing scale. All parcels will be identified with Assessor Parcel Number, width of required right-of-way acquisition and total acquisition area.

TKE will prepare all necessary final right-of-way documents for the project including permanent and temporary construction right-of-way deeds and easements. We will prepare legal descriptions and plats for each parcel requiring acquisition and, working with the City, we will attend two negotiation meetings with each property owner to negotiate the acquisition. If after two meetings a negotiated position has not been reached, the City will need to provide additional direction. TKE anticipates right-of-way document preparation for all four corner properties at the proposed roundabout intersections, approximately 40 parcels. Right-of-way documents would be prepared in accordance with the City requirements.

TASK NO. 11 60% DESIGN SECTION III | PROJECT SCOPE
60% Design will include preparation geometric roadway improvement exhibits, preliminary construction drawings, preliminary technical specifications, preliminary construction estimates, and completed geotechnical report.

Construction drawings will show proposed street geometrics including locations of proposed asphalt concrete pavement, curb and gutters, sidewalk, ramps, drive approaches, and bike lanes.

In addition, preliminary street and sidewalk grades will be prepared to establish project grading requirements. Proposed improvements will be designed in accordance with the City’s current street design standards and specifications. The proposed improvements will be designed to minimize removals, grading and earthwork.

For the drawings, we will prepare a title sheet (1), construction notes sheet (2), demolition sheets (14), plan/profile sheets (27), drainage sheets (10), bridge widening sheets (traffic signal sheets (6), signing and striping sheets (14), street light sheets (14), and necessary detail sheets.

The title sheet shall include the title of the job, a vicinity map showing the City in relationship to surrounding communities, a location map showing the project limits, a list of abbreviations used, benchmark data, general notes, construction notes and quantities, an index for the drawings, list of utilities with phone numbers, and references on the City’s standard title block.

The construction note sheet will show general construction notes and project specific requirements.

The demolition sheet will show existing improvement demolition including limits of pavement removal, saw cutting locations and limits and concrete cross gutters and curbs, if required. In addition, the plan will specify relocation of private improvements such as mailboxes fences, drive approaches, etc. as required.

Plan/profile sheets will show proposed improvements at 1”=40’ scale including curb and gutter, sidewalk, ramps, driveways, pavement limits, existing utility relocations, water service relocations, and manhole, valve, and vault cover grade adjustments. For the profile portion of the drawings, we will show existing and proposed pavement elevations at centerline top of curb and centerline with appropriate design data. The construction details will include connections and abandonment details, all at appropriate drawing scales.

Page 242 of 248 ends

15.F.

Page 746 of 1050 ends

00091740.2
Exhibit A – Scope of Services
Page | 5
Bridge design will include review of the existing bridge as-built plans to determine feasible methods for widening the existing bridge. Bridge plans will include structural calculations and plan preparation to identify all required structural steel and reinforced concrete members to widen the existing bridge abutments, piers and decking for the proposed 4 lane roadway.

The drainage sheets will be prepared in accordance with City standards and requirements. The sheet will be prepared at a 1”=20’ scale and will show existing right-of-way, curb, gutter, sidewalk, existing utilities, existing right-of-way, curb, gutter, sidewalk, existing utilities, existing drainage improvements and all proposed improvements including catch basins, pipe and connections. Storm drain sheets will show top of pipe, flowline, structures utility crossings and ground surface.

The street cross-sections sheets will show street sections at appropriate drawing scales. The sections will be dimensioned and construction and demolition notes will be shown. In addition, rights-of-way and limits of work will be shown.

Street lighting sheets will be prepared in accordance with City standards and requirements. The sheets will be prepared at a 1”=40’ scale and will show existing right-of-way, curb, gutter, sidewalk, existing utilities, existing right-of-way, curb, gutter, sidewalk, existing utilities, existing and proposed street light improvements and all proposed modifications including conduit extension and head replacements.

The electrical sheets will include design for decorative lighting at each roundabout intersection, including splitter islands to accommodate pedestrian warning lighting. The sheets will be prepared at a 1”=20’ scale and will show existing right-of-way, curb, gutter, sidewalk, existing utilities, existing right-of-way, curb, gutter, sidewalk, existing utilities, existing and proposed electrical improvements and connections.

Traffic signal sheet will be prepared in accordance with City traffic standards and requirements.

The sheets will be prepared at a 1”=20’ scale and will show existing right-of-way, curb, gutter, sidewalk, existing utilities, existing traffic signal improvements and all proposed installation including poles, loop or video placement and conduit placement.

The signing and striping sheets will include all required pavement markings, lane stripes and signage in accordance with the MUTCD, California supplement and all other applicable City requirements, for the project limits. The sheets will be prepared at 1”=40’ scale and include full geometrical layouts at each intersection.

Landscape and irrigation sheets will include design for the landscaping within the proposed raised median. The sheets will include the point of connection, irrigation layout and planting materials to be installed and shall be in conformance with city standards, specifications, ordinances, regulations and requirements.

For the specifications, we will amend the City Standards Technical Provisions as required for the projects. The construction specifications will be prepared in Microsoft Word (2020 Version) format in accordance with City standards.

In addition, we will prepare quantity estimates for all proposed improvements prepared using an excel spreadsheet showing an itemized construction cost breakdown. Descriptions of work, unit prices, and quantities will be included in the spreadsheet.

TASK NO. 12 COORDINATION WITH AGENCIES/UTILITIES
After 60% design is complete, plans will be sent to agencies having facilities in the project areas requesting that they verify their facilities are shown correctly and that they furnish any construction requirements they desire. We will highlight each agency’s facilities and advise each of potential conflicts and relocation requirements. We will request that they respond within two

Page 243 of 248 ends

15.F.

Page 747 of 1050 ends

00091740.2
Exhibit A – Scope of Services
Page | 6
weeks and we will follow up with telephone calls to confirm all agency requirements have been incorporated. We will document all conferences with utilities and agencies and copy the City via e-mail.

TASK NO. 13 PERMITTING
TKE will prepare permit applications with the following agencies as required for approval of the project design and construction.

Δ Metropolitan Water District
Δ Caltrans Encroachment Permit
Δ County of Riverside Encroachment Permit
Δ Riverside County Flood Control
Δ AT&SF Encroachment Permit
TKE will coordinate with all agencies to address any comments or concerns and track the permit process throughout approval.

TASK NO. 14 DESIGN REVIEW MEETINGS
After the City has completed its review, we will meet with City staff to acquire Staff’s comments.

TASK NO. 15 90% DESIGN
After the City has completed its review, we will meet with City staff to acquire Staff’s comments.

TASK NO. 16 90% DESIGN REVIEW MEETINGS
After the City has completed its review, we will meet with City staff to acquire Staff’s comments.

TASK NO. 17 100% DESIGN
100% design will include incorporation of City comments, final plans, specifications, and estimates, ready for public bidding. Final documents will include mylars and hard copy specifications with signatures and electronic copies of final documents. 100% Design will be submitted with a project summary memorandum together with an updated project schedule, additional stakeholder meeting summary, and internal plan review documentation.

TASK NO. 18 FINAL COORDINATION WITH AGENCIES/UTILITIES
After the final drawings are approved by the City, we will again submit them to all agencies/utilities having underground facilities in the project area requesting that they verify their facilities are shown correctly and we will advise them of the project construction schedule and relocation requirements. In addition, we will coordinate final relocation construction prior to project bidding. We will document all meetings and conferences with utilities and agencies.ECTION III | PROJECT SCOPE
TASK NO. 19 CONSTRUCTION SUPPORT PHASE
After the final drawings are approved by the City, we will again submit them to all agencies/utilities having underground facilities in the project area requesting that they verify their facilities are shown correctly and we will advise them of the project construction schedule and relocation requirements. In addition, we will coordinate final relocation construction prior to project bidding. We will document all meetings and conferences with utilities and agencies.

Page 244 of 248 ends

15.F.

Page 748 of 1050 ends

00091740.2
Exhibit B – Compensation
Page | 1
EXHIBIT “B”

COMPENSATION
Compensation for the Services shall not exceed One Million Eight Hundred and Thirty-Six Thousand Eight Hundred and Eighty-Two Dollars ($1,836,828.00).

Page 245 of 248 ends

15.F.

Page 749 of 1050 ends

EXHIBIT “C”

INSURANCE
(A)INSURANCE REQUIREMENTS. Consultant shall provide and maintain insurance, acceptable to the City, in full force and effect throughout the Term of this Agreement, against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Services by Consultant, its agents, representatives or employees. Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII. Consultant shall provide the following scope and limits of insurance:

1. MINIMUM SCOPE OF INSURANCE. Consultant shall maintain the following types and limits of insurance.

2. MINIMUM LIMITS OF INSURANCE.

GENERAL LIABILITY INSURANCE. Consultant shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000 per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.

AUTOMOBILE LIABILITY INSURANCE. Consultant shall maintain automobile liability insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with Services to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.

PROFESSIONAL LIABILITY (ERRORS & OMISSIONS) INSURANCE. Consultant shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of $2,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this Agreement and Consultant agrees to maintain continuous coverage through a period no less than three (3) years after completion of the services required by this Agreement.

WORKERS’ COMPENSATION INSURANCE. Consultant shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000 per accident or disease). Consultant shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its officers, agents, employees, and volunteers.

UMBRELLA OR EXCESS LIABILITY INSURANCE. [Optional depending on limits required]. As an option to meet the limits of insurance required by this Agreement, Consultant may obtain and maintain an umbrella or excess liability insurance policy with limits that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary

Page 246 of 248 ends

15.F.

Page 750 of 1050 ends

coverages set forth above, including commercial general liability, automobile liability, and employer’s liability. Such policy or policies shall include the following terms and conditions:

1. A drop-down feature requiring the policy to respond if any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason;

2. Pay on behalf of wording as opposed to reimbursement;

3. Concurrency of effective dates with primary policies;

4. Policies shall “follow form” to the underlying primary policies; and

5. Insureds under primary policies shall also be insureds under the umbrella or excess policies.
(B) OTHER PROVISIONS. Each insurance policy required by this Agreement shall be endorsed and state the coverage shall not be suspended, voided, canceled by the insurer or either Party to this Agreement, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to City. (C) OTHER REQUIREMENTS. Consultant agrees to deposit with City, at or before the effective date of this Agreement, certificates of insurance necessary to satisfy City that the insurance provisions of this contract have been complied with. The City Attorney may require that Consultant furnish City with copies of original endorsements effecting coverage required by this Section. The certificates and endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. City reserves the right to inspect complete, certified copies of all required insurance policies, at any time.

1. Upon request from the City, Consultant shall furnish certificates and endorsements from each subcontractor identical to those Consultant provides.

2. Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions with respect to City or its respective elected or appointed officers, officials, employees, and volunteers or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration, defense expenses and claims.

3. The procuring of such required policy or policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

4. Coverage provided by Consultant shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on

Page 247 of 248 ends