Text extracted from the city's file for reading and search. Open the original on pub-hermosabeach.escribemeetings.com. That file is the official record.

65 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.

Page 1360 of 1878 ends

66 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to local representatives of the bonding company must also be attached.

END OF PERFORMANCE BOND

Page 1361 of 1878 ends

67 E. PAYMENT BOND (LABOR AND MATERIALS)
CIP NO. 619 Kelly Courts Renovations
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Hermosa Beach (hereinafter designated as the “City”), by action taken or a resolution passed ___________________ , 20_____, has awarded to ________________________ hereinafter designated as the “Principal,” a Contract for the work described as follows: Contract No.____________ (the “Project”); and WHEREAS, said Principal is required to furnish a bond in connection with said Contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work Contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work Contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the Contractor and his subcontractors pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any Contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of

Page 1362 of 1878 ends

68 any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the Contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such Contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of Contract between the owner or City and original Contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Civil Code Section 9100, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

By their signatures hereunder, Surety and Principal hereby confirm under penalty of perjury that surety is an admitted surety insurer authorized to do business in the State of California.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.

Contractor/ Principal
By
Title

Surety
By
Attorney-in-Fact
Title

Page 1363 of 1878 ends

69 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.

Page 1364 of 1878 ends

70 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.

END OF PAYMENT BOND

Page 1365 of 1878 ends

71 F. GUARANTEE TO THE CITY OF HERMOSA BEACH
CIP NO. 619 Kelly Courts Renovations
As a material inducement to the City to award the Contract for CIP No. ______ to the ___________, the undersigned (“Guarantor”) has agreed to enter into this guarantee. The Guarantor hereby unconditionally guarantees to the fullest extent allowed by law the following work included in this project: _______________________ (“the work”).

Guarantor guarantees that the materials and equipment used by itself and its sub-Contractors will be free from defects and that the work will conform to the plans and specifications. Should any of the materials or equipment prove defective or should the work as a whole, or any part thereof, prove defective for any reason whatsoever (except due to intentional torts by the City), or should the work as a whole or any part thereof fail to operate properly or fail to comply with the plans and specifications, Guarantor will, at the City’s sole election: 1) reimburse the City, upon written demand, for all of the City’s expenses incurred replacing or restoring any such equipment or materials, including the cost of any work necessary to make such replacement or repairs; or 2) replace any such defective material or equipment and repair said work completely, all without any cost to the City. Guarantor further guarantees that any such repair work will conform to the plans and specifications for the project. This guarantee will remain in effect for one year from the date on which the Contract for the work is accepted by the City.

Guarantor understands and agrees that the City shall have the unqualified option to make any replacements or repairs itself or to have such replacement, repair, performed by the undersigned.

The City shall have no obligation to consult with Guarantor before the City proceeds to perform any repair, replacement, or work itself. If the City elects to have Guarantor perform said repair, replacement, or work, Guarantor agrees that the repair, replacement, or work shall be performed within 15 days after receipt of a written demand from the City.

If the City elects to perform the replacement, repairs itself, Guarantor agrees to make reimbursement payment within 15 days after receipt of a written demand for payment from the City.

If the Guarantor fails or refuses to comply with this guarantee, the City shall be entitled to all costs and expenses, including attorneys and expert fees, reasonably incurred by reason of Guarantor’s failure or refusal.

Guarantor

Contractor Date

By Title

Page 1366 of 1878 ends

72 G. GENERAL COMPREHENSIVE LIABLITY ADDITONAL INSURED

ENDORSMENT
CIP NO. 619 Kelly Courts Renovations

NAME OF ADDRESS OF INSURED:

General description of agreement(s) and/or activity(ies) insured:

Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or in any endorsement now or hereafter attached thereto, it is agreed as follows:

1. That the City of Hermosa Beach and its or their elected officials, officers, agents and employees are insureds thereunder in relation to those activities described generally above with regard to operations performed by or on behalf of the named insured.

2. Such insurance shall be primary, and not contributing with any other insurance maintained by the City.

3. The policy to which this endorsement is attached shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company's liability.

4. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits or non-renewal except after written notice to Risk Management, City of Hermosa Beach, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto.

CANCELLATION NOTICE AND ENDORSEMENT TO BE SENT TO:

Risk Management
City of Hermosa Beach
1315 Valley Dr. Hermosa
Beach, CA 90254
(310) 318-0202
Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.

Page 1367 of 1878 ends

73 Endorsement Effective Policy No.

No. Date

TYPE OF COVERAGES TO WHICH POLICY PERIOD

LIMITS OF

THIS ENDORSEMENT ATTACHES FROM TO

LIABILITY
Scheduled items or locations are to be identified on an attached sheet.

The following inclusions relate to the above coverages includes:
( ) Premises & Operations ( ) Explosion Hazard
( ) Contractual Liability ( ) Collapse
( ) Independent Contractors ( ) Underground Hazard
( ) Products/Completed Operations ( ) Personal Injury
( ) Broad Form Property Damage ( )
( ) Broad Form Liability Endorsement
A deductible or self-insured retention (strike out one) of applies to coverage.

DEDUCTIBLE APPLIES PER CLAIM, PER OCCURRENCE

INSURANCE COMPANY
ADDRESS:

I, , (print name) hereby declare under penalty of
perjury, under the laws of the State of California, that I have the authority to bind the above-named insurance company to this endorsement and by my execution hereof, do so bind said company.

Signature of Authorized Representative (Original Signature only; No facsimile signature or initialed signature accepted) Executed at , on , 20 .

Phone No.: ( )

Page 1368 of 1878 ends

74 H. AUTOMOBILE LIABILITY ADDITIONAL INSURED ENDORSEMENT CIP NO. 619 Kelly Courts Renovations

NAME OF ADDRESS OF INSURED:

General description of agreement(s) and/or activity(ies) insured:

Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or in any endorsement now or hereafter attached thereto, it is agreed as follows:

1. That the City of Hermosa Beach and its or their elected officials, officers, agents and employees are insureds thereunder in relation to those activities described generally above with regard to operations performed by or on behalf of the named insured.

2. Such insurance shall be primary, and not contributing with any other insurance maintained by the City.

3. The policy to which this endorsement is attached shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company's liability.

4. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits or non-renewal except after written notice to Risk Management, City of Hermosa Beach, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto.

CANCELLATION NOTICE AND ENDORSEMENT TO BE SENT TO:

Risk Management
City of Hermosa Beach
1315 Valley Dr. Hermosa
Beach, CA 90254
(310) 318-0202

Page 1369 of 1878 ends

75 Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.

Endorsement Effective Policy No.

No. Date

TYPE OF COVERAGES TO WHICH POLICY PERIOD

LIMITS OF

THIS ENDORSEMENT ATTACHES FROM TO

LIABILITY
Scheduled items or locations are to be identified on an attached sheet.

The following inclusions relate to the above coverages includes:
( ) Owned Automobiles ( ) Owned, Non-owned and Hired Automobiles ( ) Non-owned Automobiles
( ) Hired Automobiles
A deductible or self-insured retention (strike out one) of applies to coverage.

DEDUCTIBLE APPLIES PER CLAIM, PER OCCURRENCE

INSURANCE COMPANY
ADDRESS:

I, , (print name) hereby declare under penalty of
perjury, under the laws of the State of California, that I have the authority to bind the above-named insurance company to this endorsement and by my execution hereof, do so bind said company.

Signature of Authorized Representative (Original Signature only; No facsimile signature or initialed signature accepted) Executed at , on , 20 .

Phone No.: ( )

Page 1370 of 1878 ends

76 I. INSTRUCTIONS FOR COMPLETING, EXECUTING, AND SUBMITTING

EVIDENCE OF INSURANCE TO THE OWNER
CIP NO. 619 Kelly Courts Renovations
Insured: Date:
(Contractor, Lessee, Permittee, etc.)
Insured
A. In order to reduce problems and time delays in providing evidence of insurance to the City, you are requested to give your insurance agent or broker a copy of the attached Insurance Requirements and endorsement forms along with these instructions for completing, executing, and submitting evidence of insurance.

If the agreement requires Workers' Compensation coverage and you have been authorized by the State of California to self-insure Workers' Compensation, then a copy of the certificate from the State authorizing self-insurance for Workers' Compensation shall meet the requirements for Workers' Compensation insurance covering activities within the State of California.

All questions relating to insurance should be directed to the department or office responsible for your Contract, lease, permit, or other agreement.

Insurance Agent or Broker
B. The appropriate Endorsement Form shall be used. No changes in the terms of the Endorsement will be permitted. Certificates of Insurance alone will not be accepted by the City.

More than one insurance policy may be required to comply with the insurance requirements.

Endorsement forms appropriate to your insured's Contract, lease or permit are checked below and enclosed.
( ) Workers' Compensation/Employers Liability
( ) General Liability
( ) Automobile Liability
( ) Excess/umbrella Liability
( ) Professional Liability
( ) Property insurance
( ) Fine Arts Property Insurance
You shall have an authorized representative of the insurance company sign the completed endorsement forms, note his phone number at the bottom of page 2 and have said representative transmit the forms to the City. Signatures must be originals as the City will not accept facsimile (rubber stamp, photocopy, etc.) or initialed signatures.

Page 1371 of 1878 ends

77 The name of the Insurance Company underwriting the coverage and its address shall be noted on page 2 of the endorsement form.

The "General description of agreement(s) and/or activity(ies) insured" shall include reference to the activity and/or to either the specific City Contract number, lease number, permit number or construction approval number.

The coverages and limits for each type of insurance are specified in the attached sheet of insurance requirements. When coverage is on a scheduled basis, then a separate sheet is to be attached to the endorsement listing such scheduled locations, vehicles, etc., so covered.

Endorsements to excess policies will be required when primary insurance is insufficient in complying with the City's requirements.

If there is insufficient space on the form to note pertinent information, such as inclusions, exclusions or specific provisions, etc., a separate sheet may be attached.

When additional sheets are attached, change the number of pages at the bottom of the form.

Completed Endorsement(s) and questions relating to the required insurance are to be directed to:

Risk Management
City of Hermosa Beach
1315 Valley Dr. Hermosa
Beach, CA 90254
(310) 318-0202
Improperly completed Endorsements will be returned to your insured for correction by an authorized representative of the insurance company.

DELAY IN SUBMITTING PROPERLY COMPLETED ENDORSEMENT FORMS MAY

DELAY YOUR INSURED'S INTENDED OCCUPANCY OR OPERATION UNDER AGREEMENT WITH THE OWNER.

For extensions or renewals of insurance policies which have the City's Endorsement Form(s) attached, the City will accept a copy of the endorsement (with an original signature) to extend the period of coverage as evidence of continued coverage.

Page 1372 of 1878 ends

78 J. WORKER'S COMPENSATION INSURANCE CERTIFICATE
CIP NO. 619 Kelly Courts Renovations
The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of the Contract.

DATED:

CONTRACTOR:

By:

Signature

Title
ATTEST:

By:

Signature

Title

Page 1373 of 1878 ends

79 K. SUPPLEMENTAL INFORMATION TO BE COMPLETED BY PRINCIPAL CIP NO. 619 Kelly Courts Renovations
If an individual, so state. If a firm or co-partnership, state the firm and give the names of all individual co-partners composing the partnership. If a corporation, state legal name of corporation; state also the names of the president, secretary, treasurer, and manager thereof. ______________________________________________________
______________________________________________________
______________________________________________________
Business Address: ______________________________________________________ ______________________________________________________
______________________________________________________
Telephone Number:

Date:

Print Name: ___________________________________________ Principal
Signature: ___________________________________________

Page 1374 of 1878 ends

80 L. W9 FORM

Page 1375 of 1878 ends

COMPLIANCE WITH CARB REGULATIONS
The City is a Public Works Awarding Body, as defined under Title 13 California Code of Regulations section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, a valid Certificate of Reported Compliance (“CRC”) for the Bidder’s and its listed subcontractors fleet (including any applicable leased equipment or vehicles) . Bidder must complete and submit the Fleet Compliance Certification, on the form included in the bid package. Failure to provide a valid CRC for the Bidder’s fleet, and for the fleets of all listed subcontractors, or failure to complete the Fleet Compliance Certification, may render the Bid non-responsive.

Fleet Compliance Certification.

Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:

The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.

The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).

The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).

The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.

Name of Bidder:_________________________________________________ Signature: __________________________________________________ Name: __________________________________________________ Title: __________________________________________________ Date: __________________________________________________

Page 1376 of 1878 ends

TP-1
CIP NO. 619 KELLY COURTS RENOVATIONS PROJECT
VI. TECHNICAL PROVISIONS
The following Technical Provisions supplement and amend the 2021 Standard Specifications for Public Works Construction (SSPWC). These Technical Provisions have been arranged into a format and sequence that parallels the Standard Specifications for Public Works Construction.

Page 1377 of 1878 ends

City of Hermosa Beach
Hermosa Beach Pickle Ball Court
Improvements
Hermosa Beach, California
Prepared by
NUVIS
425 Valley Drive
Hermosa Beach California 90254
Project Number 22-040.01

PROJECT
MANUAL

Page 1378 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
- 1

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION
00 01 10 Table of Contents

SPECIFICATIONS GROUP

FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 - EXISTING CONDITIONS
02 41 19 SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 09 - FINISHES
09 96 23 ANTI-GRAFFITI COATING

FACILITY SERVICES SUBGROUP
DIVISION 26 - ELECTRICAL
26 00 10 SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
26 05 19 LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL

SYSTEMS
26 05 33.13 CONDUITS FOR ELECTRICAL SYSTEMS
26 05 33.16 BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
26 05 33.23 SURFACE RACEWAYS FOR ELECTRICAL

SYSTEMS
26 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR

ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 09 23 LIGHTING CONTROL DEVICES
DIVISION 31 - EARTHWORK
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 13 13 CONCRETE PAVING
32 18 23.43 CONCRETE BASKETBALL & MULTI-PURPOSE

COURT SURFACE COLOR COATING SYSTEM

Page 1379 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
- 2
32 18 23.53 CONCRETE TENNIS COURT SURFACE COLOR

COATING SYSTEM
32 18 23.63 CONCRETE PICKLEBALL COURT SURFACE

COLOR COATING SYSTEM
32 31 13 CHAIN LINK FENCES AND GATES
32 33 00 SITE FURNISHINGS

END OF TABLE OF CONTENTS

Page 1380 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
SELECTIVE DEMOLITION 024119 - 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Demolition and removal of selected site elements.

2. Furnishing labor, materials and equipment necessary for demolition, dismantling, cutting and alterations as indicated, specified, or required for completion of the Work.

1.2 REFERENCES & RELATED SECTIONS
A. SSPWC - Standard Specifications for Public Works Construction, Latest Edition.

B. APWA - American Public Works Association.

1.3 REGULATORY REQUIREMENTS
A. Conform to Section 300, SSPWC, Latest Edition.

1.4 COORDINATION AND QUALITY ASSURANCE
A. Contractor shall secure and maintain all required permits and licenses and pay all fees necessary to legally complete the work of this section.

B. Contractor shall notify utility companies for all utilities to be cut off, modified, or relocated, and shall maintain and protect all active utilities.

C. Prior to commencement of Work, schedule a walkthrough with the City Authorized Representative, to confirm Owner property items have been removed from scheduled Work areas. Identify and mark remaining property items and schedule their removal.

D. Coordinate demolition for the correct sequence, limits, and methods. Schedule demolition Work to create the least possible inconvenience to the public and facility operations.

E. Contractor is required to take photo documentation of existing pavement condition at site entrance, adjacent lights (night), permanent structures, and other site conditions prior to start of work. Photos shall be submitted tothe City/Owner.

Page 1381 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
SELECTIVE DEMOLITION 024119 - 2

1.5 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to the City/Owner that may be uncovered during demolition remain the property of the City/Owner

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.6 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.

1.7 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.

B. Schedule of selective demolition activities with starting and ending dates for each activity.

C. Predemolition photographs or video.

1.8 FIELD CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by City/Owner as far as practical.

B. Notify Engineer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

C. Storage or sale of removed items or materials on-site is not permitted.

D. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

E. Maintain fire-protection facilities in service during selective demolition operations.

F. Arrange selective demolition schedule so as not to interfere with City/Owner’s operations.

G. Drawings may not indicate in detail all demolition Work to be performed. Examine existing conditions to determine the full extent of required demolition.

Page 1382 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
SELECTIVE DEMOLITION 024119 - 3
H. Repair damage to existing improvements or damage due to excessive demolition.

I. Provide all measures to avoid excessive damage from inadequate or improper means and methods, improper shoring, bracing or support.

J. If conditions are encountered that varies from those indicated, promptly notify the Engineer for clarification before proceeding.

1.9 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.

1.10 PROTECTION AND SAFETY
A. Contractor shall provide signs and construction fencing in all necessary locations to exclude persons, except those connected with the work, from entering the work area.

Contractor is responsible for protecting the project site and adjacent properties from dirty water, mud, and water accumulation due to Contractor’s operations, rainfall run-off or any water that enters the project site from any other source.

B. Contractor shall protect from any hazards resulting from his operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. All known underground utilities are noted on the plans and are approximate locations;

Page 1383 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
SELECTIVE DEMOLITION 024119 - 4
Contractor to pothole and locate all utilities prior to start of demolition.

B. Should the Contractor encounter existing underground utilities not shown on the drawings, he shall at once notify the City's Authorized Representative who will determine further procedure.

C. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

D. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. City's Authorized Representative will arrange to shut off indicated services/systems when requested by Contractor.

2. Arrange to shut off utilities with utility companies.

3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of park site.

3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Do not commence demolition until fencing, safety partitions, barricades, warning signs and other forms of protection are installed.

2. Provide all safeguards, including warning signs, lights and barricades, for protection of workers, occupants, and the public.

3. All existing palms, trees, curbs, paving, turf, etc. shall be protected in place as noted on the Drawings. Any damage to protected site features shall be repaired and/or replaced by the contractor at no additional cost to the Owner.

4. If applicable, See Section 02850, Tree Protection, for additional information.

B. Safety: If, at any time, safety of existing construction appears to be endangered, take immediate measures to correct such conditions; cease operations and immediately notify the Engineer.

C. Remove temporary barricades and protections where hazards no longer exist.

3.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

Page 1384 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
SELECTIVE DEMOLITION 024119 - 5
C. Existing Items to Remain: Protect construction indicated to remain against damage during selective demolition.

D. Contractor shall notify the City's Authorized Representative prior to start of demolition to allow the Owner to identify items to be salvaged.

E. Clear the site to be improved of weed growth, rubbish and debris, and concrete/asphalt rubble, etc., that are to be removed for construction of the improvements shown on the Drawings. Roots 3” in diameter and larger, and rocks & broken masonry larger than 4” in the greatest dimension shall be removed to a minimum depth of 12” below finished grade, or as necessary to allow for improvements shown on plans.

F. All deleterious materials shall be disposed of off the site in a legal manner by the Contractor, who shall make all necessary arrangements and pay all related costs.

G. Do not throw or drop materials. Use ramps or chutes as required.

H. Remove existing construction only to extent necessary for proper installation of Work and interfacing with existing construction. Cut back finished surfaces to straight, plumb or level lines as required for a smooth transition.

I. Where openings are cut oversize or in improper locations, replace or repair to original condition.

J. Demolition and paving removal work shall be carefully done to avoid damage to existing facilities not designated for removal. Contractor shall repair and/or replace items demolished in excess of amounts indicated on the Drawings at their own expense.

3.5 CLEANING
A. Remove demolition waste materials from Project site and dispose of them in an EPAapproved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Clean existing materials to remain with appropriate tools and equipment.

1. Protect existing improvements during cleaning operations.

2. Debris shall be dampened by fog water spray prior to transporting by truck.

3. Debris pick-up area shall be kept broom-clean and shall be washed daily with clean water.

4. Remove waste and debris. Continuously clean up and remove items as demolition Work progresses.

5. Remove rubbish, debris, and waste materials and legally dispose of off the Project site.

Page 1385 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
SELECTIVE DEMOLITION 024119 - 6

3.6 DUST CONTROL
A. Dust shall be kept to a minimum during site clearing operations by means of wetting the site with water or other approved method. Application shall be made as often as necessary to keep dust from occurring.

B. Daily activity: After all clearing and grubbing operations are complete, sweep down all exiting sidewalks and roadways on and off the site that have become soiled due to Contractor’s operations.

C. All concrete shall be power washed and final condition approved by City’s Authorized Representative.

3.7 END OF SECTION
END OF SECTION 024119

Page 1386 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 1
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL

1.1 SUMMARY
A. Related Requirements:

1. Section 031000 "Concrete Forming and Accessories" for form-facing materials, form liners, insulating concrete forms, and waterstops.

2. Section 032000 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.

3. Section 033300 "Architectural Concrete" for general building applications of specially finished formed concrete.

4. Section 033543 "Polished Concrete Finishing" for concrete floors scheduled to receive a polished concrete finish.

5. Section 035300 "Concrete Topping" for concrete floor toppings.

6. Section 312000 "Earth Moving" for drainage fill under slabs-on-ground.

7. Section 321313 "Concrete Paving" for concrete pavement and walks.

8. Section 321316 "Decorative Concrete Paving" for decorative concrete pavement and walks.

1.2 DEFINITIONS
A. Cementitious Materials: Portland cement or blended hydraulic cement alone or in combination with one or more of the following:

1. Slag cement, other pozzolans, and silica fume; materials subject to compliance with requirements.

B. Water/Cementitious Materials (w/cm) Ratio: The ratio by weight of mixing water to cementitious materials.

1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.

1. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:
a. Contractor's superintendent.
b. Independent testing agency responsible for inspections and acceptance testing of concrete at Project site.
c. Ready-mix concrete manufacturer.
d. Concrete Subcontractor.
e. Special concrete finish Subcontractor.

Page 1387 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 2

2. Review the following:
a. Special inspection and testing and inspecting agency procedures for field quality control.
b. Construction joints, control joints, isolation joints, and joint-filler strips. c. Semirigid joint fillers.
d. Vapor-retarder installation.
e. Anchor rod and anchorage device installation tolerances. f. Cold- and hot-weather concreting procedures.
g. Concrete finishes and finishing.
h. Curing procedures.
i. Forms and form-removal limitations.
j. Shoring and reshoring procedures.
k. Methods for achieving specified floor and slab flatness and levelness. l. Floor and slab flatness and levelness measurements.
m. Concrete repair procedures.
n. Concrete protection.
o. Initial curing of standard-cured and field curing of field-cured test cylinders (ASTM C31/C31M.)
p. Protection of field cured field test cylinders.
q. Distribution of test reports.

1.4 ACTION SUBMITTALS
A. Product Data:

1. Portland cement.

2. Blended hydraulic cement.

3. Performance-based hydraulic cement.

4. Slag cement.

5. Silica fume.

6. Natural or other pozzolans.

7. Aggregates.

8. Ground calcium carbonate and aggregate mineral fillers.

9. Admixtures:
a. Include limitations of use. Admixtures that do not comply with reference ASTM International requirements must be submitted with test data for approval.

10. Color pigments.

11. Fiber reinforcement.

12. Vapor retarders.

13. Floor and slab treatments.

14. Liquid floor treatments.

15. Curing materials.
a. Include documentation from color pigment manufacturer, indicating that proposed methods of curing are recommended by color pigment

Page 1388 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 3
manufacturer.

16. Joint fillers.

17. Repair materials.

B. Sustainable Design Submittals:

C. Design Mixtures: For each concrete mixture, include the following:

1. Mixture identification.

2. Compressive strength at 28 days or other age as specified.

3. Compressive strength required at stages of construction.

4. Durability exposure classes for Exposure Categories F, S, W, and C.

5. Maximum w/cm ratio.

6. Calculated equilibrium and fresh density for lightweight concrete.

7. Slump or slump flow limit.

8. Air content.

9. Nominal maximum aggregate size.

10. Steel-fiber reinforcement content.

11. Synthetic microfiber content.

12. Synthetic macrofiber content.

13. Intended placement method.

14. Submit adjustments to design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant changes.

D. Shop Drawings:

1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.
a. Location of construction joints is subject to approval of the Architect.

E. Concrete Schedule: For each location of each class of concrete indicated in "Concrete Mixture Class Types" Article, including the following:

1. Concrete class designation.

2. Location within Project.

3. Exposure class designation.

4. Formed surface finish designation and final finish.

5. Final finish for floors.

6. Floor treatment, if any.

1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For the following:

1. Installer: Include copies of applicable ACI certificates.

2. Testing Agency: Include documentation indicating compliance with ASTM E329 or ASTM C1077 and copies of applicable ACI certificates for testing technicians or ACI Concrete Construction Special Inspector - MH, ASCC.

Page 1389 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 4
B. Material Certificates: For each of the following:

1. Cementitious materials.

2. Admixtures.

3. Fiber reinforcement.

4. Curing compounds.

5. Floor and slab treatments.

6. Bonding agents.

7. Adhesives.

8. Vapor retarders.

9. Semirigid joint filler.

10. Joint-filler strips.

11. Repair materials.

C. Material Test Reports: For the following:

1. Portland cement.

2. Blended hydraulic cement.

3. Performance-based hydraulic cement.

4. Slag cement.

5. Silica fume.

6. Natural or other pozzolans.

7. Aggregates.

8. Ground calcium carbonate and aggregate mineral filler.

9. Admixtures.

D. Floor surface flatness and levelness measurements report, indicating compliance with specified tolerances in accordance with ACI 117 and in compliance with ASTM E1155.

E. Research Reports:

1. For concrete admixtures in accordance with ICC's Acceptance Criteria AC198.

2. For sheet vapor retarder/termite barrier, showing compliance with ICC's Acceptance Criteria AC380.

F. Preconstruction Test Reports: For each mix design.

G. Field quality-control reports.

H. Minutes of preinstallation conference.

1.6 QUALITY ASSURANCE
A. Installer Qualifications: A qualified Installer who employs Project personnel qualified as an ACI-certified Concrete Flatwork Associate and Concrete Flatwork Finisher and a supervisor who is a certified ACI Advanced Concrete Flatwork Finisher/Technician or an ACI Concrete Flatwork Finisher with experience installing and finishing concrete.

1. Post-Installed Concrete Anchors Installers: ACI-certified Adhesive Anchor Installer.

Page 1390 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 5
B. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94/C94M requirements for production facilities and equipment.

1. Manufacturer's production facilities and delivery vehicles certified in accordance with NRMCA's certification requirements or equivalent approval by a State DOT.

C. Laboratory Testing Agency Qualifications: A testing agency qualified in accordance with ASTM C1077 and ASTM E329 for testing that performs duties on behalf of the Architect/Engineer.

1. Personnel performing laboratory tests to be an ACI-certified Concrete Strength Testing Technician and Concrete Laboratory Testing Technician, Level 1.

Testing agency laboratory supervisor tests to be an ACI-certified Concrete Laboratory Testing Technician, Level 2.

D. Field Quality-Control Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.

1. Personnel conducting field tests on plastic concrete properties are to be qualified as an ACI Concrete Field Testing Technician, Grade 1, in accordance with policies from ACI CPP 610.1 or an equivalent certification program.

E. Mockups: Cast concrete slab-on-ground and formed-surface panels to demonstrate typical joints, surface finish, texture, tolerances, floor treatments, and standard of workmanship. Provide up to two batches of concrete to demonstrate the number of required mockups.

1. Slab-on-Ground: Build panel in the location indicated or, if not indicated, as directed by Architect.
a. Divide panel into four equal panels to demonstrate saw joint cutting.

2. Formed Surfaces: Build panel in the location indicated or, if not indicated, as directed by Architect.

3. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.7 PRECONSTRUCTION TESTING
A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on each concrete mixture.

1. Include the following information in each test report:
a. Admixture dosage rates.
b. Slump.
c. Air content.
d. Seven-day compressive strength.

Page 1391 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 6
e. 28-day compressive strength.
f. Evaluation of permeability-reducing admixtures.

1.8 DELIVERY, STORAGE, AND HANDLING
A. Comply with ASTM C94/C94M and ACI 301.

1.9 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 301 as follows:

1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

2. When air temperature has fallen to, or is expected to fall below 40 deg F during the protection period, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.

3. Do not use frozen materials or materials containing ice or snow.

4. Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.

B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:

1. Maintain concrete temperature at time of discharge to not exceed 95 deg F.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete.

Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

1.10 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to furnish replacement sheet vapor retarder/termite barrier material and accessories for sheet vapor retarder/ termite barrier and accessories that do not comply with requirements or that fail to resist penetration by termites within specified warranty period.

1. Warranty Period: 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 CONCRETE STANDARDS
A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.

2.2 CONCRETE MATERIALS
A. Source Limitations:

Page 1392 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 7

1. Obtain all concrete mixtures from a single ready-mixed concrete manufacturer for entire Project.

2. Obtain each type of admixture from single source from single manufacturer.

B. Cementitious Materials:

1. Portland Cement: ASTM C150/C150M, Type V

2. Blended Hydraulic Cement: ASTM C595/C595M, Type IL, as shown on Drawings

3. Performance-Based Hydraulic Cement: ASTM C1157/C1157M: as shown on Drawings.

4. Pozzolans: ASTM C618, Class C, F, or N.

5. Slag Cement: ASTM C989/C989M, Grade 100 or 120.

6. Ground Glass Pozzolan: ASTM C1866/C1866M, Type GS or GE.

7. Silica Fume: ASTM C1240.

C. Normal-Weight Aggregates:

1. Coarse Aggregate: ASTM C33/C33M, As shown on Drawings.

2. Maximum Coarse-Aggregate Size: As shown on Drawings nominal.

3. Fine Aggregate: ASTM C33/C33M.

4. Recycled Aggregate: Provide documentation of characteristics of recycled aggregate and mechanical properties and durability of proposed concrete, which incorporates recycled aggregate to conform to appliable requirements for the class of concrete.

5. Alkali-Silica Reaction: Comply with one of the following for each aggregate used:
a. Expansion Result of Aggregate: Not more than 0.04 percent at one year when tested in accordance with ASTM C1293.
b. Expansion Results of Aggregate and Cementitious Materials in Combination: Not more than 0.10 percent at an age of 16 days when tested in accordance with ASTM C1567. Do not use this option with fly ash with an alkali content greater than 4.0 percent. Submit supporting data for each aggregate showing expansion in excess of 0.10 percent when tested in accordance with ASTM C1260.
c. Alkali Content in Concrete: Not to exceed 4 lb./cu. yd. for aggregate with expansion greater than or equal to 0.04 percent and less than 0.12 percent or 3 lb./cu. yd. for aggregate with expansion greater than or equal to 0.12 percent and less than 0.24 percent. Test aggregate reactivity in accordance with ASTM C1293. Calculate alkali content of concrete in accordance with ACI 301. Do not use this option with natural pozzolan that has a calcium oxide content greater than 18 percent or an alkali content greater than 4.0 percent; or for an aggregate with expansion at one year greater than or equal to 0.24 percent when tested in accordance with ASTM C1293.

D. Lightweight Aggregate: ASTM C330/C330M, nominal maximum aggregate size as shown on Drawings.

1. Limit lightweight aggregate for internal curing to prewetted lightweight fine aggregate in accordance with ASTM C1761/C1761M.

Page 1393 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 8
E. Ground Calcium Carbonate or Aggregate Mineral Filler: ASTM C1797. Unless otherwise permitted, do not use mineral filler derived from carbonate sources in concrete for members assigned to Exposure Class S1, S2, or S3.

2.3 ADMIXTURES
A. Air-Entraining Admixture: ASTM C260/C260M.

B. Chemical Admixtures: Do not use calcium chloride or admixtures containing calcium chloride as shown on Drawings .

1. Water-Reducing Admixture: ASTM C494/C494M, Type A.

2. Retarding Admixture: ASTM C494/C494M, Type B.

3. Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C494/C494M, Type F.

5. High-Range, Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type G.

6. Admixtures with special properties, with documentation of claimed performance enhancement, ASTM C494/C494M, Type S.

C. Mixing Water for Concrete Mixtures and Water Used to Make Ice: ASTM C1602/C1602M. Include documentation of compliance with limits for alkalis, sulfates, chlorides, or solids content of mixing water from Table 2 in ASTM C1602/C1602M.

2.4 FLOOR AND SLAB TREATMENTS
A. Emery Dry-Shake Floor Hardener: As shown on Drawings, factory-packaged, dry combination of portland cement, graded emery aggregate, and plasticizing admixture; with emery aggregate consisting of no less than 60 percent of total aggregate content.

1. Color: As shown on the Drawings..

B. Metallic Dry-Shake Floor Hardener: As shown on Drawings, factory-packaged, dry combination of portland cement, graded metallic aggregate, rust inhibitors, and plasticizing admixture; with metallic aggregate consisting of no less than 65 percent of total aggregate content.

1. Color: As shown on Drawings..

2.5 CURING MATERIALS
A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

B. Moisture-Retaining Cover: ASTM C171, polyethylene film burlap-polyethylene sheet.

1. Color:

Page 1394 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 9
a. Ambient Temperature Below 50 deg F (10 deg C): Black. b. Ambient Temperature between 50 and 85 deg F (10 and 29 deg C): Any color.
c. Ambient Temperature Above 85 deg F (29 deg C): White.

C. Water: Potable water that does not cause staining of the surface.

2.6 ACCESSORIES
A. Expansion- and Isolation-Joint-Filler Strips: As shown on Drawings.

B. Semirigid Joint Filler: Two-component, semirigid, 100 percent solids, as shown on Drawings, in accordance with ASTM D2240.

C. Bonding Agent: ASTM C1059/C1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.

D. Epoxy Bonding Adhesive: ASTM C881/C881M, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade and class to suit requirements, and as follows:

1. As shown on Drawings, for bonding hardened or freshly mixed concrete to hardened concrete.

2.7 REPAIR MATERIALS
A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.

1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.

2. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand, as recommended by underlayment manufacturer.

4. Compressive Strength: Not less than 4100 psi at 28 days when tested in accordance with ASTM C109/C109M.

B. Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/4 inch and that can be filled in over a scarified surface to match adjacent floor elevations.

1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.

2. Primer: Product of topping manufacturer recommended for substrate, conditions, and application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by topping manufacturer.

Page 1395 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 10

4. Compressive Strength: Not less than 5000 psi at 28 days when tested in accordance with ASTM C109/C109M.

2.8 CONCRETE MIXTURE MATERIALS
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.

1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland or hydraulic cement in concrete assigned to Exposure Class F3 as follows:

1. Pozzolans: 25 percent by mass.

2. Slag Cement: 50 percent by mass.

3. Silica Fume: 10 percent by mass.

4. Total of Pozzolans, Slag Cement, and Silica Fume: 50 percent by mass, with pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

5. Total of Pozzolans and Silica Fume: 35 percent by mass with pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.

1. Use corrosion-inhibiting admixture in concrete mixtures where indicated.

2. Use permeability-reducing admixture in concrete mixtures where indicated.

D. Color Pigment: Add color pigment to concrete mixture in accordance with manufacturer's written instructions and to result in hardened concrete color consistent with approved mockup.

2.9 CONCRETE MIXTURE CLASS TYPES
A. Class A: Normal-weight concrete used for footings, grade beams, and tie beams.

1. Exposure Class: ACI 318 Class F0.

2. Minimum Compressive Strength: 3000 psi as shown on Drawings.

3. Maximum w/cm Ratio: 0.40.

4. Slump Limit: 4 inches, plus or minus 1 inch for concrete.

5. Slump Flow Limit: As shown on Drawings

6. Air Content:
a. Exposure Class F1: As shown on Drawings.
b. Exposure Classes F2 and F3: As shown on Drawings.

7. Limit water-soluble, chloride-ion content in hardened concrete to manufacturer’s

Page 1396 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 11
recommended percent by weight of cementitious materials.

8. Compressive strength or alternative methods of estimating in-place strength of concrete by maturity or other nondestructive testing with acceptable correlation between test results and concrete compressive strength as shown on Drawings,

2.10 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with ASTM C94/C94M and furnish delivery ticket.

B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete in accordance with ASTM C94/C94M. Mix concrete materials in appropriate drum-type batch machine mixer.

1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than five minutes after ingredients are in mixer, before any part of batch is released.

2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd..

3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Verification of Conditions:

1. Before placing concrete, verify that installation of concrete forms, accessories, reinforcement, and embedded items is complete and that required inspections have been performed.

2. Do not proceed until unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Provide reasonable auxiliary services to accommodate field testing and inspections, acceptable to testing agency, including the following:

1. Daily access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Secure space for storage, initial curing, and field curing of test samples, including source of water and continuous electrical power at Project site during site curing period for test samples.

4. Security and protection for test samples and for testing and inspection equipment at Project site.

Page 1397 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 12

3.3 TOLERANCES
A. Comply with ACI 117.

3.4 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.

1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install reglets to receive waterproofing and through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.

3.5 INSTALLATION OF CAST-IN-PLACE CONCRETE
A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.

1. Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.

2. Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.

B. Notify Architect and testing and inspection agencies 24 hours prior to commencement of concrete placement.

C. Water addition in transit or at the Project site must be in accordance with ASTM C94/C94M and must not exceed the permitted amount indicated on the concrete delivery ticket.

D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.

1. If a section cannot be placed continuously, provide construction joints as indicated.

2. Deposit concrete to avoid segregation.

3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.

4. Consolidate placed concrete with mechanical vibrating equipment in accordance with ACI 301.
a. Do not use vibrators to transport concrete inside forms. b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer. c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.

Page 1398 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 13
d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.

1. Do not place concrete floors and slabs in a checkerboard sequence.

2. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

3. Maintain reinforcement in position on chairs during concrete placement.

4. Screed slab surfaces with a straightedge and strike off to correct elevations.

5. Level concrete, cut high areas, and fill low areas.

6. Slope surfaces uniformly to drains where required.

7. Begin initial floating using bull floats or darbies to form a uniform and opentextured surface plane, before excess bleedwater appears on the surface.

8. Do not further disturb slab surfaces before starting finishing operations.

3.6 INSTALLATION OF JOINTS
A. Construct joints true to line, with faces perpendicular to surface plane of concrete.

B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.

1. Install so strength and appearance of concrete are not impaired, at locations indicated on Drawings or as approved by Architect.

2. Place joints perpendicular to main reinforcement.
a. Continue reinforcement across construction joints unless otherwise indicated.

3. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete.

4. Locate joints for beams, slabs, joists, and girders at third points of spans. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.

5. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

6. Space vertical joints in walls as indicated on Drawings. Unless otherwise indicated on Drawings, locate vertical joints beside piers integral with walls, near corners, and in concealed locations where possible.

7. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.

8. Use epoxy-bonding adhesive at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.

C. Control Joints in Slabs-on-Ground: Form weakened-plane control joints, sectioning concrete into areas as indicated. Construct control joints for a depth equal to at least one-fourth of concrete thickness as follows and as indicated on Drawings:

Page 1399 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 14

1. Grooved Joints: Form control joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch. Repeat grooving of control joints after applying surface finishes. Eliminate groover tool marks on concrete surfaces.

2. Sawed Joints: Form control joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random cracks.

D. Isolation Joints in Slabs-on-Ground: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.

1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface unless otherwise indicated on Drawings.

2. Terminate full-width joint-filler strips not less than 1/2 inch or more than 1 inch below finished concrete surface, where joint sealants, specified in Section 079200 "Joint Sealants," are indicated.

3. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.

E. Doweled Joints:

1. Install dowel bars and support assemblies at joints where indicated on Drawings.

2. Lubricate or asphalt coat one-half of dowel bar length to prevent concrete bonding to one side of joint.

F. Dowel Plates: Install dowel plates at joints where indicated on Drawings.

3.7 APPLICATION OF FINISHING FLOORS AND SLABS
A. Broom Finish: Apply a broom finish to exterior concrete landings, ramps, and locations indicated on Drawings.

1. Immediately after float finishing, slightly roughen trafficked surface by brooming with a fiber-bristle broom perpendicular to main traffic route.

2. Coordinate required final finish with Architect before application.

B. Dry-Shake Floor Hardener Finish: After initial floating, apply dry-shake floor hardener to surfaces in accordance with manufacturer's written instructions and as follows:

1. Uniformly apply dry-shake floor hardener at a rate of 100 lb/100 sq. ftunless greater amount is recommended by manufacturer.

2. Uniformly distribute approximately two-thirds of dry-shake floor hardener over surface by hand or with mechanical spreader, and embed by power floating.

3. Follow power floating with a second dry-shake floor hardener application, uniformly distributing remainder of material, and embed by power floating.

4. After final floating, apply a trowel finish.

5. Cure concrete with curing compound recommended by dry-shake floor hardener manufacturer and apply immediately after final finishing.

Page 1400 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 15

3.8 APPLICATION OF FINISHING FORMED SURFACES
A. As-Cast Surface Finishes:

1. ACI 301 (ACI 301M) Surface Finish SF-1.0: As-cast concrete texture imparted by form-facing material.
a. Patch voids larger than 1-1/2 inches wide or 1/2 inch deep. b. Remove projections larger than 1 inch.
c. Tie holes do not require patching.
d. Surface Tolerance: ACI 117, Class D.
e. Apply to concrete surfaces for metal lap pan deck formed surfaces and those surfaces that are buried or covered with subsequent installed surfaces.

2. ACI 301 (ACI 301M) Surface Finish SF-2.0: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams.
a. Patch voids larger than 3/4 inch wide or 1/2 inch deep. b. Remove projections larger than 1/4 inch.
c. Patch tie holes.
d. Surface Tolerance: ACI 117, Class B.
e. Locations: Apply to concrete surfaces exposed to public view,.

3. ACI 301 (ACI 301M) Surface Finish SF-3.0:
a. Patch voids larger than 3/4 inch wide or 1/2 inch deep. b. Remove projections larger than 1/8 inch.
c. Patch tie holes.
d. Surface Tolerance: ACI 117 Class A.
e. Locations: Apply to concrete surfaces exposed to public view,.

B. Rubbed Finish: Apply the following to as-cast surface finishes where indicated on Drawings:

1. Grout-Cleaned Rubbed Finish:
a. Clean concrete surfaces after contiguous surfaces are completed and accessible.
b. Do not clean concrete surfaces as Work progresses.
c. Mix 1 part portland cement to 1-1/2 parts fine sand, complying with ASTM C144 or ASTM C404, by volume, with sufficient water to produce a mixture with the consistency of thick paint. Add white portland cement in amounts determined by trial patches, so color of dry grout matches adjacent surfaces.
d. Wet concrete surfaces.
e. Scrub grout into voids and remove excess grout. When grout whitens, rub surface with clean burlap, and keep surface damp by fog spray for at least 36 hours.
f. Maintain required patterns or variances as shown on Drawings or to match

Page 1401 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 16
design reference sample.

C. Abrasive-Blast Finish: Apply the following to as-cast surface finishes as indicated on Drawings:

1. Perform abrasive blasting after compressive strength of concrete exceeds 2000 psi.

2. Coordinate with formwork removal to ensure that surfaces to be abrasive blasted are treated at the same age.

3. Surface Continuity:
a. Perform abrasive-blast finishing as continuous operation, maintaining continuity of finish on each surface or area of Work.
b. Maintain required patterns or variances in depths of blast to match design reference sample.

4. Abrasive Blasting:
a. Abrasive-blast corners and edges of patterns carefully, using backup boards to maintain uniform corner and edge lines.
b. Determine type of nozzle pressure and blasting techniques required to match field sample.
c. Depth of Cut: Use an abrasive grit of proper type and gradation to expose aggregate and surrounding matrix surfaces to match field sample, as follows:
1) Brush Texture: Remove cement matrix to dull surface sheen and expose face of fine aggregate, with no significant reveal. 2) Light Texture: Expose fine aggregate with occasional exposure of coarse aggregate and uniform color, with maximum reveal of 1/16 inch.
3) Medium Texture: Generally, expose coarse aggregate with slight reveal and with a maximum reveal of 1/4 inch.
4) Heavy Texture: Expose and reveal coarse aggregate to a maximum projection of one-third its diameter, with reveal range of 1/4 to 1/2 inch.
d. Maintain required patterns or variances in reveal projection to match design reference sample.

D. High-Pressure Water-Jet Finish: Apply the following to as-cast surface finishes as indicated on Drawings:

1. Perform high-pressure water jetting on concrete that has achieved a minimum compressive strength of 4500 psi.

2. Coordinate with formwork removal to ensure that surfaces to be high-pressure water-jet finished are treated at same age for uniform results.

3. Surface Continuity: Perform high-pressure water-jet finishing in as continuous an operation as possible, maintaining continuity of finish on each surface or area of Work.

4. Maintain required patterns or variances in reveal projection to design reference

Page 1402 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 17
sample.

E. Bushhammer Finish: Apply the following to as-cast surface finishes as indicated on Drawings:

1. Perform bushhammer finish to concrete that has achieved a minimum compressive strength of 4500 psi.

2. Surface Continuity:
a. Perform bushhammer finishing in as continuous an operation as possible, maintaining continuity of finish on each surface or area of Work.

3. Surface Cut:
a. Maintain required depth of cut and general aggregate exposure. b. Use power tool with hammer attachments for large, flat surfaces, and use hand hammers for small areas, at corners and edges, and for restricted locations where power tools cannot reach.

4. Remove impressions of formwork and form facings with exception of tie holes.

5. Maintain required patterns or variances of cut as shown on Drawings or to match design reference sample.

6. Maintain control of concrete chips, dust, and debris in each Work area, limiting migration of airborne materials and dust by use of tarpaulins, windbreaks, or similar devices.

3.9 INSTALLATION OF MISCELLANEOUS CONCRETE ITEMS
A. Filling in:

1. Fill in holes and openings left in concrete structures after Work of other trades is in place unless otherwise indicated.

2. Mix, place, and cure concrete, as specified, to match color and texture with inplace construction exposed to view.

3. Provide other miscellaneous concrete filling indicated or required to complete the Work.

B. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.

C. Equipment Bases and Foundations:

1. Coordinate sizes and locations of concrete bases with actual equipment provided.

2. Construct concrete bases As shown on Drawings. Unless otherwise indicated on Drawings and extend base not less than 6 inches in each direction beyond the maximum dimensions of supported equipment unless otherwise indicated on Drawings, or unless required for seismic anchor support.

3. Minimum Compressive Strength: Unless otherwise noted on Drawing,3000 psi at

Page 1403 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 18
28 days.

4. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of concrete base.

5. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete substrate.

6. Prior to pouring concrete, place and secure anchorage devices. a. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
b. Cast anchor-bolt insert into bases.
c. Install anchor bolts to elevations required for proper attachment to supported equipment.

D. Steel Pan Stairs: Provide concrete fill for steel pan stair treads, landings, and associated items.

1. Cast-in inserts and accessories, as shown on Drawings.

2. Screed, tamp, and trowel finish concrete surfaces.

3.10 APPLICATION OF CONCRETE CURING
A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

1. Comply with ACI 301 for cold weather protection during curing.

2. Comply with ACI 301 and ACI 305.1 for hot-weather protection during curing.

3. Maintain moisture loss no more than 0.2 lb/sq. ft. x h, calculated in accordance with ACI 305R, before and during finishing operations.

B. Curing Formed Surfaces: Comply with ACI 308.1 as follows:

1. Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces.

2. Cure concrete containing color pigments in accordance with color pigment manufacturer's instructions.

3. If forms remain during curing period, moist cure after loosening forms.

4. If removing forms before end of curing period, continue curing for remainder of curing period as follows:
a. Continuous Fogging: Maintain standing water on concrete surface until final setting of concrete.
b. Continuous Sprinkling: Maintain concrete surface continuously wet. c. Absorptive Cover: Pre-dampen absorptive material before application; apply additional water to absorptive material to maintain concrete surface continuously wet.
d. Water-Retention Sheeting Materials: Cover exposed concrete surfaces with sheeting material, taping, or lapping seams.
e. Membrane-Forming Curing Compound: Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's

Page 1404 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 19
written instructions.
1) Recoat areas subject to heavy rainfall within three hours after initial application.
2) Maintain continuity of coating and repair damage during curing period.

C. Curing Unformed Surfaces: Comply with ACI 308.1 as follows:

1. Begin curing after finishing concrete.

2. Interior Concrete Floors:
a. Floors to Receive Floor Coverings Specified in Other Sections: Contractor has option of the following:
1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.
a) Lap edges and ends of absorptive cover not less than 12 inches.
b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days. 2) Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive.
a) Immediately repair any holes or tears during curing period, using cover material and waterproof tape.
b) Cure for not less than seven days.
3) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following not in cold weather:
a) Water.
b) Continuous water-fog spray.
b. Floors to Receive Penetrating Liquid Floor Treatments: Contractor has option of the following:
1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.
a) Lap edges and ends of absorptive cover not less than 12 inches.
b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days.

Page 1405 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 20
2) Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive.
a) Immediately repair any holes or tears during curing period, using cover material and waterproof tape.
b) Cure for not less than seven days.
3) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following:
a) Water.
b) Continuous water-fog spray.
c. Floors to Receive Polished Finish: Contractor has option of the following:
1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.
a) Lap edges and ends of absorptive cover not less than 12 inches.
b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days. 2) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following:
a) Water.
b) Continuous water-fog spray.
d. Floors To Receive Chemical Stain:
1) As soon as concrete has sufficient set to permit application without marring concrete surface, install curing paper over entire area of floor.
2) Install curing paper square to building lines, without wrinkles, and in a single length without end joints.
3) Butt sides of curing paper tight; do not overlap sides of curing paper. 4) Leave curing paper in place for duration of curing period, but not less than 28 days.
e. Floors To Receive Urethane Flooring:
1) As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.
2) Rewet absorptive cover, and cover immediately with polyethylene

Page 1406 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 21
moisture-retaining cover with edges lapped 6 inches and sealed in place.
3) Secure polyethylene moisture-retaining cover in place to prohibit air from circulating under polyethylene moisture-retaining cover. 4) Leave absorptive cover and polyethylene moisture-retaining cover in place for duration of curing period, but not less than 28 days. f. Floors To Receive Curing Compound:
1) Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's written instructions.
2) Recoat areas subjected to heavy rainfall within three hours after initial application.
3) Maintain continuity of coating, and repair damage during curing period.
4) Removal: After curing period has elapsed, remove curing compound without damaging concrete surfaces by method recommended by curing compound manufacturer.
g. Floors To Receive Curing and Sealing Compound:
1) Apply uniformly to floors and slabs indicated in a continuous operation by power spray or roller in accordance with manufacturer's written instructions.
2) Recoat areas subjected to heavy rainfall within three hours after initial application.
3) Repeat process 24 hours later, and apply a second coat. Maintain continuity of coating, and repair damage during curing period.

3.11 INSTALLATION OF JOINT FILLING
A. Prepare, clean, and install joint filler in accordance with manufacturer's written instructions.

1. Defer joint filling until concrete has aged at least one month(s).

B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave contact faces of joints clean and dry.

C. Install semirigid joint filler full depth in saw-cut joints and at least 2 inches deep in formed joints.

D. Overfill joint, and trim joint filler flush with top of joint after hardening.

3.12 INSTALLATION OF CONCRETE SURFACE REPAIRS
A. Defective Concrete:

1. Repair and patch defective areas when approved by Architect.

Page 1407 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 22

2. Remove and replace concrete that cannot be repaired and patched to meet specification requirements.

B. Patching Mortar: Mix dry-pack patching mortar, consisting of 1 part portland cement to 2-1/2 parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing.

C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks in excess of 0.01 inch spalls, air bubbles exceeding surface finish limits, honeycombs, rock pockets, fins and other projections on the surface exceeding surface finish limits, and stains and other discolorations that cannot be removed by cleaning.

1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension to solid concrete.
a. Limit cut depth to 3/4 inch.
b. Make edges of cuts perpendicular to concrete surface. c. Clean, dampen with water, and brush-coat holes and voids with bonding agent.
d. Fill and compact with patching mortar before bonding agent has dried. e. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.

2. Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement, so that, when dry, patching mortar matches surrounding color.
a. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching.
b. Compact mortar in place and match surrounding surface.

3. Repair defects on concealed formed surfaces that will affect concrete's durability and structural performance, as determined by Architect.

D. Repairing Unformed Surfaces:

1. Test unformed surfaces, such as floors and slabs, for finish, and verify surface tolerances specified for each surface.
a. Correct low and high areas.
b. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template.

2. Repair finished surfaces containing surface defects, including spalls, popouts, honeycombs, rock pockets, crazing, and cracks in excess of 0.01 inch wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width.

3. After concrete has cured at least 14 days, correct high areas by grinding.

4. Correct localized low areas during, or immediately after, completing surfacefinishing operations by adding patching mortar.

Page 1408 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 23
a. Finish repaired areas to blend into adjacent concrete.

5. Correct other low areas scheduled to receive floor coverings with a repair underlayment.
a. Prepare, mix, and apply repair underlayment and primer in accordance with manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.
b. Feather edges to match adjacent floor elevations.

6. Correct other low areas scheduled to remain exposed with repair topping. a. Cut out low areas to ensure a minimum repair topping depth of 1/4 inch to match adjacent floor elevations.
b. Prepare, mix, and apply repair topping and primer in accordance with manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.

7. Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete. a. Remove defective areas with clean, square cuts, and expose steel reinforcement with at least a 3/4-inch clearance all around. b. Dampen concrete surfaces in contact with patching concrete and apply bonding agent.
c. Mix patching concrete of same materials and mixture as original concrete, except without coarse aggregate.
d. Place, compact, and finish to blend with adjacent finished concrete. e. Cure in same manner as adjacent concrete.

8. Repair random cracks and single holes 1 inch or less in diameter with patching mortar.
a. Groove top of cracks and cut out holes to sound concrete, and clean off dust, dirt, and loose particles.
b. Dampen cleaned concrete surfaces and apply bonding agent. c. Place patching mortar before bonding agent has dried. d. Compact patching mortar and finish to match adjacent concrete. e. Keep patched area continuously moist for at least 72 hours.

E. Perform structural repairs of concrete, subject to Architect's approval, using epoxy adhesive and patching mortar.

F. Repair materials and installation not specified above may be used, subject to Architect's approval.

3.13 FIELD QUALITY CONTROL
A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.

Page 1409 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 24
B. Testing Agency: Owner will engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

1. Testing agency to be responsible for providing curing facility for initial curing of strength test specimens on-site and verifying that test specimens are cured in accordance with standard curing requirements in ASTM C31/C31M.

2. Testing agency to immediately report to Architect, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents.

3. Testing agency to report results of tests and inspections, in writing, to Owner, Architect, Contractor, and concrete manufacturer within 48 hours of inspections and tests.
a. Test reports to include reporting requirements of ASTM C31/C31M, ASTM C39/C39M, and ACI 301, including the following as applicable to each test and inspection:
1) Project name.
2) Name of testing agency.
3) Names and certification numbers of field and laboratory technicians performing inspections and testing.
4) Name of concrete manufacturer.
5) Date and time of inspection, sampling, and field testing. 6) Date and time of concrete placement.
7) Location in Work of concrete represented by samples. 8) Date and time sample was obtained.
9) Truck and batch ticket numbers.
10) Design compressive strength at 28 days.
11) Concrete mixture designation, proportions, and materials. 12) Field test results of fresh concrete, including slump or slump flow, air content, temperature and density.
13) Information on storage and curing of samples at the Project site, including curing method and maximum and minimum temperatures during initial curing period.
14) Type of fracture and compressive break strengths at seven days and 28 days.

4. Provide a space and source of power or other resources for curing and access to test specimens by the testing agency.

C. Delivery Tickets: comply with ASTM C94/C94M.

D. Inspections:

1. Headed bolts and studs.

2. Verification of use of required design mixture.

3. Concrete placement, including conveying and depositing.

4. Curing procedures and maintenance of curing temperature.

5. Verification of concrete strength before removal of shores and forms from beams and slabs.

6. Batch Plant Inspections: On a random basis, as determined by Architect.

Page 1410 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 25
E. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with ASTM C 172/C 172M to be performed in accordance with the following requirements:

1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 150 cu. yd. or fraction thereof.
a. When frequency of testing provides fewer than five compressive-strength tests for each concrete mixture, testing is to be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

2. Slump: ASTM C143/C143M:
a. One test at point of delivery for each composite sample, but not less than one test for each day's pour of each concrete mixture.
b. Perform additional tests as needed.

3. Slump Flow: ASTM C1611/C1611M:
a. One test at point of delivery for each composite sample when strength test specimens are cast, but not less than one test for each day's pour of each concrete mixture.
b. Perform additional tests as needed.

4. Air Content: ASTM C231/C231M pressure method, for normal-weight concrete; ASTM C173/C173M volumetric method, for structural lightweight concrete. a. One test for each composite sample when strength test specimens are cast, but not less than one test for each day's pour of each concrete mixture.

5. Concrete Temperature: ASTM C1064/C1064M:
a. One test hourly when air temperature is 40 deg F and below or 80 deg F and above, and one test for each composite sample when strength test specimens are cast.

6. Concrete Density: ASTM C138/C138M:
a. One test for each composite sample when strength test specimens are cast.

7. Unit Weight: ASTM C138/C138M density of fresh structural lightweight concrete. a. One test for each composite sample, but not less than one test for each day's pour of each concrete mixture. The fresh density should be consistent with that associated with the equilibrium density within a tolerance of plus or minus 4 lb/ft.3.

8. Compression Test Specimens: ASTM C31/C31M:

Page 1411 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 26
a. Cast and standard cure two sets of two 6 inches by 12-inches or 4-inch by 8-inch cylindrical specimens for each composite sample. b. Cast, and field cure two sets of two standard cylindrical specimens for each composite sample.

9. Compressive-Strength Tests: ASTM C39/C39M.
a. Test one set of two standard cured specimens at seven days and one set of two specimens at 28 other age days.
b. Test one set of two field-cured specimens at seven days and one set of two specimens at 28 days.
c. A compressive-strength test to be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.

10. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, Contractor to evaluate operations and provide corrective procedures for protecting and curing in-place concrete.

11. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests of standard cured cylinders equals or exceeds specified compressive strength, and no compressive-strength test value falls below specified compressive strength by more than 500 psi if specified compressive strength is 5000 psi, or no compressive strength test value is less than 10 percent of specified compressive strength if specified compressive strength is greater than 5000 psi.

12. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete.

13. Additional Tests:
a. Testing and inspecting agency to make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Architect. b. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C42/C42M or by other methods as directed by Architect.
1) Acceptance criteria for concrete strength to be in accordance with ACI 301, Section 1.7.6.3.

14. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

15. Correct deficiencies in the Work that test reports and inspections indicate do not comply with the Contract Documents.

F. Measure floor and slab flatness and levelness in accordance with ASTM E1155 within 24 hours of completion of paving finishing and promptly report test results to Architect.

Page 1412 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CAST-IN-PLACE CONCRETE 033000 - 27

3.14 PROTECTION
A. Protect concrete surfaces as follows:

1. Protect from petroleum stains.

2. Diaper hydraulic equipment used over concrete surfaces.

3. Prohibit vehicles from interior concrete slabs.

4. Prohibit use of pipe-cutting machinery over concrete surfaces.

5. Prohibit placement of steel items on concrete surfaces.

6. Prohibit use of acids or acidic detergents over concrete surfaces.

7. Protect liquid floor treatment from damage and wear during the remainder of construction period. Use protective methods and materials, including temporary covering, recommended in writing by liquid floor treatments installer.

8. Protect concrete surfaces scheduled to receive surface hardener or polished concrete finish using floor slab protective covering.

END OF SECTION 033000

Page 1413 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
ANTI-GRAFFITI COATING 099623 - 1
SECTION 099623 - ANTI-GRAFFITI COATING
PART 1 - GENERAL

1.1 Anti-Graffiti Coating Summary:

A. Description: This section includes the application of graffiti resistant coatings to protect above grade, vertical masonry and concrete surfaces.

1. “Coatings” as used herein means all graffiti resistant coating system materials, including base coatings and top coatings required to achieve the performance requirements of this section.
a. Included:
1) Clear (transparent) graffiti resistant coating
2) Water repellant sealer

1.2 References:

A. ASTM D 2369-92 – Test method for volatile organic content of coatings.

B. ASTM D 3960-93 – Practice for volatile organic compound (VOC) content of paints and related coatings.

1.3 Submittals:

A. Product Data: In accordance with the provisions of submittal section, submit complete manufacturer’s literature and specifications, include complete lists of materials proposed for use, giving the manufacturers name, product numbers, and product information sheets for each specific item. Submit description for protection of surrounding areas and non-masonry surfaces, surface preparation, application, and final cleaning.

B. Maintenance Requirements: Submit manufacturer’s instructions for graffiti removal procedures.

C. Application and Safety: Submit manufacturer’s recommendation methods of installation including limitations, safety and environmental cautions, and material safety data sheets.

1.4 Quality Assurance
A. Applicator Qualifications:

Page 1414 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
ANTI-GRAFFITI COATING 099623 - 2

1. Applicator must be trained by manufacturer on application of protective coating, safety practices, clean up, removal of graffiti and ongoing maintenance of coating.
a. Outside applicator must be experienced applicator and have a history of successful applications within the past two years. Applicator must use skilled workers who are trained, experienced, and familiar with the specific requirements and methods of similar products.

B. Performance Requirements:

1. Graffiti resistant coating shall be a permanent coating. Products shall not require reapplication after removal for life of the warranty period provided that the manufacturer’s specifications for removal have been followed throughout the life of the coating.

2. Product must be available to suit architectural aesthetics of substrate and must come in clear with a satin or gloss finish.

3. Coatings and removal products must have been in commercial use for a period of not less than five (5) years.

1.5 Environmental Regulations
A. Comply with the California Code of Regulations Title 24.

B. Comply with all applicable Federal, State, and local codes and regulations.

C. All products must not contain VOC (zero VOC), solvents or odors for the air quality management district where application takes place. Where those requirements conflict with this specification, comply with the more stringent provisions.

D. Reduction must be water.

E. Clean up with thinners and solvents. MEK, toluene, xylene will not be approved.

1.6 Test Panels
A. Before full-scale application, review the manufacturer’s product data sheet and apply sealer and graffiti resistant coating to test panels to determine number of applications, coverage rates, mils thickness, compatibility, effectiveness, surface preparation, application procedures and desired results. Final specifications will be determined by this procedure.

B. Apply sealer and graffiti resistant coating to test panels in accordance with manufacturer’s written instructions. Allow 48 hours or until test panels are thoroughly dry and tack free before evaluating final appearance and results. Do not begin fullscale application until test panels are reviewed and accepted by project official, architect, manufacturer, applicator and the construction manager.

C. Test Panel Requirements:

Page 1415 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
ANTI-GRAFFITI COATING 099623 - 3

1. Size: minimum 4 feet each or as determined by project coordinator.

2. Locations: as determined by project coordinator.

3. Numbers: as required to completely test each sealer and graffiti resistant coating with each typical substrate to be protected.
a. Test panel shall be tested in accordance with the performance of this section for the removal of all graffiti from the coating. Removal agent shall also be demonstrated to the satisfaction of the section. b. No evidence of ghosting, shadowing or staining shall remain after removal provided that all manufacturer’s recommendations have been followed with regard to application of the coating and removal process.

D. Apply the system as specified in a designated area. This will serve an indication that the applicator can provide acceptable results and will be used as the standard for the rest of the work.

E. Retain and protect test panels approved by project manager in undisturbed condition during the work of this section, to be used as a standard for judging the graffiti resistance coating work.

1.7 Delivery, Storage, and Handling
A. Delivery: Deliver materials to site or specified address in manufacturer’s original, unopened containers and packaging, bearing the manufacturer’s label with the following information:

1. Name or title of material

2. Manufacturer’s stock number and date of manufacturing (batch number)

3. Manufacturer’s name

4. Contents by volume and weight

5. Application/instructions

6. Technical specifications

7. Color name number (if applicable)
B. Storage and Handling:

1. Store materials not in actual use, except those materials already catalyzed, in tightly covered containers. Maintain containers used in storage of paint in clean condition, free of foreign materials and residue.

2. Do not allow material to freeze. Protect from freezing where necessary, containers should be protected from prolonged exposure to hear or sunlight.

Materials should be stored in an environment between 45 and 75 degrees Fahrenheit.

3. Keep storage area neat and orderly. Remove flammable rags and waste daily.

Take all precautions to ensure that workman and work areas are adequately protected from the fire hazards and health hazards from handling, mixing, and application of paints.

Page 1416 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
ANTI-GRAFFITI COATING 099623 - 4

1.8 Project Conditions
A. Apply Okon PLGR-5 CMU water repellant as base coat to provide water repellant surfaces, control pH and for overall aesthetics of surface. Follow manufacturer’s directions for application.

B. Apply SCR 3 clear gloss top coat only when temperature of surfaces to be coated and surrounding air temperatures are between 50 and 90 degrees Fahrenheit. Allow first coat to dry before applying second coat. Do not apply wet on wet.

C. Do not apply topcoat when relative humidity exceeds 80%. Do not apply earlier than 24 hours after rain or if rain is predicted for a period of 12 hours after application, unless otherwise indicated by manufacturer’s written instructions.

D. Do not apply to frozen substrates. Allow adequate time for substrate to thaw, if freezing conditions exist before application.

E. Do not apply under windy conditions such that graffiti control coating may be blown to surfaces not intended to be treated.

1.9 Maintenance Products
A. Extra Products: Furnish County Coordinator with the following extra products:

1. Graffiti Resistant Coating: 1 gallon

2. Graffiti Removal Agent: 1 gallon

1.10 Warranty
A. Warranty shall cover the original purchaser for a period of up to ten (10) years from the date of purchase.

B. Manufacturer shall warrant the removal of all graffiti defacement, chemical staining, ghosting, shadowing and normal environmental effects, without exception, and will retain reasonable gloss and color stability so long as product is applied and maintained according to manufacturer’s recommendations.

PART 2 - PRODUCTS

2.1 Manufacturers
A. Design is based on products manufactured by: Genesis Coating Incorporated in California (800) 533-4273

Page 1417 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
ANTI-GRAFFITI COATING 099623 - 5

2.2 Graffiti Control Coatings
A. Graffiti control coating must be tested and approved by the Project Coordinator.

B. Graffiti control coating must have the capability of having all types of paints and graffiti materials (currently known to the public) completely removed without damaging both the coating and the substrate when removed according to manufacturer’s written recommendations.

C. Removal agent shall be non-toxic and have a PH level between 7 and 8.5. After removal is complete, no evidence of graffiti shall be present when used in accordance with manufacturer’s written recommendations.

D. The removal of graffiti materials shall not cause a change in appearance of the treated surface for the period of the warranty when removal is completed in compliance with manufacturer’s written recommendations.

E. The graffiti control coating should follow the technical data as listed below:

1. Resin type of graffiti control coating should be aliphatic polyurethane.

2. Percent solids of mixed material should equal:
a. Percent Solids by Weight: Clear 60%/Pigmented=66% (mixed) b. Percent Solids by Volume: Clear=58%/Pigmented=64% (mixed)

3. Specific gravity should equal 1.05.

4. Pot life of mixed material should be between 1.5 to 2 hours.

5. Full cure of applied material should be between 3 to 5 days depending on temperature and humidity.

6. Graffiti control coating should be a two-component coating system.

7. Graffiti control coating should be reducible with water.

8. Graffiti control coating should contain zero volatile organic compounds (VOC).

PART 3 - EXECUTION

3.1 EXAMINATION
A. Prior to the commencement of the Work of this Section, applicator must examine areas and conditions where graffiti control coating is to be applied. Applicator must notify Contractor in writing of conditions detrimental to proper and timely completion. Do not proceed with Work until unsatisfactory conditions have been corrected in a manner acceptable to the applicator.

B. Starting if coating Work will be construed as applicator’s acceptance of the surfaces and conditions in any particular area.

C. Do not apply over dirt, rust, scale, grease, moisture, or conditions otherwise detrimental to formation of durable paint film as discussed in manufacturer’s technical specifications.

Page 1418 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
ANTI-GRAFFITI COATING 099623 - 6

3.2 Protection
A. Protect surrounding areas, landscaping, building occupants, pedestrians, vehicles, and non masonry surfaces not designated for protection during the Work from graffiti resistant coatings, masonry or concrete cleaners if used, residues, rinse water, fumes, wastes, and effluents in accordance with manufacturer’s written specifications.

B. Cover finished work and materials of all other trades that may be affected by work of the Section during coating application. Protect all surrounding adjacent areas from overspray.

C. Divert and protect pedestrian and vehicle traffic.

3.3 Surface Preparation
A. General: Perform preparation and cleaning procedures in accordance with coating manufacturer’s instruction and as herein specified for each particular substrate condition.

1. Clean surfaces to be painted before applying coating or surface treatments.

Remove oil, grease, and other surface contaminants prior to mechanical cleaning. Program cleaning and painting so that contaminants from the cleaning process will not fall onto wet, newly surfaces.

B. Repair, patch, and fill all cracks, voids, defects, and damaged areas in surface as approved by Construction Manager. Allow repair materials to cure completely before application of graffiti resistant coatings.

C. Apply compatible sealant and caulking and allow to cure completely before application of graffiti resistance coating.

D. Seal all open joints
E. Apply new construction substrates to properly cure before graffiti control.

F. Properly clean the new substrates as specified in manufacturer’s technical data.

3.4 Application of Graffiti Control Coating
A. General: Apply sealer and graffiti resistant coating in accordance with manufacturer’s directions. Review material safety data sheets prior to use of material. Use application techniques best suited for substrate and type of material to be applied.

B. Applicator must know the substrate that is to be coated and understand the porosity, texture, and general conditions that will be present during the application to provide a correct bid and choose correct product acquisition.

C. Anti-graffiti coating must be reducible with clean, fresh water at a rate of 5%-20% depending on applications.

Page 1419 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
ANTI-GRAFFITI COATING 099623 - 7
D. Do not mix two-component coating at any other rate than the ratio supplied by manufacturer.

E. Applicator must use caution when spraying materials. Applicator should wear OSHA approved respirator with organic vapor cartridge. Avoid over-spray and spillage. Mark all windows, move vehicles, cover air intakes, cover vegetation, and warn pedestrians prior to spraying. Applicator must make sure there is proper ventilation.

F. Do not apply in windy conditions.

G. Applicator shall do a test sample prior to application to confirm aesthetics, compatibility and coverage. Project Coordinator, architect and the construction manager must indicate acceptance of the test sample and sign off prior to full application.

H. Apply material between 50 degrees and 90 degrees Fahrenheit with a relative humidity not to exceed 80%.

3.5 Application Rates
A. Use Okon PLGR-5 CMU Water Repellant sealer to achieve a proper profile for a pinhole free, continuous coating. Allow sealer to cure based on product manufacturer’s direction.

B. Allow approximately 6-8 hours, or until tack free, dry time between each coat of GCR 3 Clear Top Coat. Full cure of material is approximately 3-5 days.

C. Temperature and humidity will affect and cure time of graffiti control coating.

D. Typically apply 2 mils dry (3-5 wet mil, do not exceed 7 wet mils) per coat to achieve optimal performance, however it is mandatory to determine the acceptable mils thickness for each specified job.

E. Mark time of application to establish pot life of material. Typical pot life is 1.5 to 2 hours depending on temperature and humidity. Exposure to direct sunlight, heat, or high humidity will decrease pot life of the material. Discard material after 2.5 hours.

F. Product should not be mixed with other products or containers of GCP 1000 Do not mix partial kits.

G. Follow manufacturer’s specified mixing instructions and dwell time charts. Never add water directly to activator or unanalyzed polyol.

H. Apply coating in a crosshatch pattern. One vertical pass and on horizontal pass are considered one coat.

I. Spray applications are recommended by manufacturer for optimal coverage and appearance. Material sets up quickly and pulls easily, use caution when backrolling.

J. Coverage rates are affected by porosity, texture, method of application and environmental conditions. Average coverage rates should be approximately 250 top

Page 1420 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
ANTI-GRAFFITI COATING 099623 - 8
280 square feet per gallon per coat. Application will require two coats of material.

Coverage rates for extremely porous surfaces will be substantially lower than normal rates. Applicator should establish coverage rates for job under these conditions. Do not use universal spec to determine coverage.

K. More material is not better. Over application will result in microblistering, poor adhesion, and blushing.

3.6 Graffiti Removal
A. Use manufacturer’s recommended graffiti remover for the specific system.

B. Spray vandalized area, allow 1-3 minutes before aggravating with a soft bristle brush or sponge.

C. Wash graffiti off with damp towels or pressure washer (1500psi)

3.7 Cleaning, Touching Up and Refinishing
A. General: Clean equipment immediately with solvents. Do not allow catalyzed material to stay in hoses beyond pot life. Clean material on shin and hair immediately with industrial soap and water.

B. Carefully remove all splatters, spots, and blemishes caused by work of this Section.

C. Upon completion of the Work, remove all rubbish, cans, and accumulated materials resulting from the Work. All areas must be left in a clean and orderly condition.

D. Runs, sags, misses, holidays, stains and other defects ion the coated surface, including inadequate coverage and mil thickness, will be satisfactorily touched up or refinished.

3.8 Field Quality Control
A. Inspection: Inspect the graffiti resistant coating Work with the construction manager, applicator, Project Coordinator and manufacturer’s representative, and compare with test panel results accepted by all of the above.

END OF SECTION 099623

Page 1421 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 1
SECTION 260010 - SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Requirements generally applicable to all electrical Work on the Project, including but not limited to Work specified in Divisions 26, 27, and 28.

B. Related Requirements:

1. Section 018116 "Facility Environmental Requirements" specifies basis-of-design environmental conditions and performance criteria that are applicable to product selection and installation of the Work on the Project.

2. Section 018123 "Facility Seismic and Wind Criteria" specifies basis-of-design seismic and wind criteria for nonstructural components on the Project.

1.2 REFERENCES
A. Abbreviations and Acronyms for Electrical Terms and Units of Measure:

1. 8P8C: An 8-position 8-contact modular jack.

2. A: Ampere, unit of electrical current.

3. AC or ac: Alternating current.

4. AFCI: Arc-fault circuit interrupter.

5. AIC: Ampere interrupting capacity.

6. AL, Al, or ALUM: Aluminum.

7. ASD: Adjustable-speed drive.

8. ATS: Automatic transfer switch.

9. AWG: American wire gauge; see ASTM B258.

10. BAS: Building automation system.

11. BIL: Basic impulse insulation level.

12. BIM: Building information modeling.

13. BMS: Building management system.

14. CAD: Computer-aided design or drafting.

15. CATV: Community antenna television.

16. CB: Circuit breaker.

17. cd: Candela, the SI fundamental unit of luminous intensity.

18. CO/ALR: Copper-aluminum, revised.

19. COPS: Critical operations power system.

20. CU or Cu: Copper.

21. CU-AL or AL-CU: Copper-aluminum.

22. dB: Decibel, a unitless logarithmic ratio of two electrical, acoustical, or optical power values.

23. dB(A-weighted) or dB(A): Decibel acoustical sound pressure level with APage 1422 of 1878 NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 2
weighting applied in accordance with IEC 61672-1.

24. dB(adjusted) or dBa: Decibel weighted absolute noise power with respect to 3.16 pW (minus 85 dBm).

25. dBm: Decibel absolute power with respect to 1 mW.

26. DC or dc: Direct current.

27. DCOA: Designated critical operations area.

28. DDC: Direct digital control (HVAC).

29. EGC: Equipment grounding conductor.

30. ELV: Extra-low voltage.

31. EMF: Electromotive force.

32. EMI: Electromagnetic interference.

33. EMP: Electrical maintenance program (operation and maintenance); electromagnetic pulse (transient analysis).

34. EPS: Emergency power supply.

35. EPSS: Emergency power supply system.

36. ESS: Energy storage system.

37. EV: Electric vehicle.

38. EVPE: Electric vehicle power export equipment.

39. EVSE: Electric vehicle supply equipment.

40. FACU: Fire-alarm control unit.

41. fc: Footcandle, an internationally recognized unit of illuminance equal to one lumen per square foot or 10.76 lx. The simplified conversion 1 fc = 10 lx in the Specifications is common practice and considered adequate precision for building construction activities. When there are conflicts, lux is the primary unit; footcandle is specified for convenience.

42. FLC: Full-load current.

43. ft: Foot.

44. ft-cd: Foot-candle, the antiquated U.S. standard unit of illuminance, equal to one international candle measured at a distance of one foot, that was superseded in 1948 by the unit "footcandle" when the SI unit candela (cd) replaced the international candle; see "fc."

45. FTP: File transfer protocol.

46. GEC: Grounding electrode conductor.

47. GFCI: Ground-fault circuit interrupter.

48. GFPE: Ground-fault protection of equipment.

49. GND: Ground.

50. HACR: Heating, air conditioning, and refrigeration.

51. HDPE: High-density polyethylene.

52. HID: High-intensity discharge.

53. HP or hp: Horsepower.

54. HVAC: Heating, ventilating, and air conditioning.

55. Hz: Hertz.

56. IBT: Intersystem bonding termination.

57. ICT: Information and communications technology.

58. inch: Inch. To avoid confusion, the abbreviation "in." is not used.

59. I/O: Input/output.

60. IP: Ingress protection rating (enclosures); Internet protocol (communications).

61. IR: Infrared.

62. IS: Intrinsically safe.

63. IT&R: Inspecting, testing, and repair.

Page 1423 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 3

64. ITE: Information technology equipment.

65. kAIC: Kiloampere interrupting capacity.

66. kcmil or MCM: One thousand circular mils.

67. kV: Kilovolt.

68. kVA: Kilovolt-ampere.

69. kvar: Kilovolt-ampere reactive.

70. kW: Kilowatt.

71. kWh: Kilowatt-hour.

72. LAN: Local area network.

73. lb: Pound (weight).

74. lbf: Pound (force).

75. LCD: Liquid-crystal display.

76. LCDI: Leakage-current detector-interrupter.

77. LED: Light-emitting diode.

78. Li-ion: Lithium-ion.

79. lm: Lumen, the SI-derived unit of luminous flux.

80. LNG: Liquefied natural gas.

81. LP-Gas: Liquefied petroleum gas.

82. LRC: Locked-rotor current.

83. LV: Low voltage.

84. lx: Lux, the SI-derived unit of illuminance equal to one lumen per square meter.

85. m: Meter.

86. MCC: Motor-control center.

87. MDC: Modular data center.

88. MG set: Motor-generator set.

89. MIDI: Musical instrument digital interface.

90. MLO: Main lugs only.

91. MPEG-2: Abbreviation for the ISO/IEC Moving Picture Experts Group's standard for generic coding of moving pictures and associated audio information (ISO/IEC 13818) released in 1995 and used for most over-the-air and satellite broadcast digital television.

92. MPEG-4: Abbreviation for the ISO/IEC Moving Picture Experts Group's standard framework for coding of audio-visual objects (ISO/IEC 14496) released in 1999, with digital rights management and more advanced compression algorithms than MPEG-2.

93. MOV: Metal-oxide varistor.

94. MV: Medium voltage.

95. MVA: Megavolt-ampere.

96. mW: Milliwatt.

97. MW: Megawatt.

98. MWh: Megawatt-hour.

99. N.C.: Normally closed.
100. Ni-Cd: Nickel-cadmium.
101. Ni-MH: Nickel-metal hydride.
102. NIU: Network interface unit.
103. N.O.: Normally open.
104. NPT: National (American) standard pipe taper.
105. OCPD: Overcurrent protective device.
106. ONT: Optical network terminal.
107. PC: Personal computer.

Page 1424 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 4
108. PCS: Power conversion system.
109. PCU: Power-conditioning unit.
110. PF or pf: Power factor.
111. PHEV: Plug-in hybrid electric vehicle.
112. PLC: Programmable logic controller.
113. PLFA: Power-limited fire alarm.
114. PoE: Power over Ethernet.
115. POTS: Plain old telephone service. See "public switched telephone network" definition.
116. PSTN: Public switched telephone network.
117. PV: Photovoltaic.
118. PVC: Polyvinyl chloride.
119. pW: Picowatt.
120. RFI: (electrical) Radio-frequency interference; (contract) Request for interpretation.
121. RMS or rms: Root-mean-square.
122. RPM or rpm: Revolutions per minute.
123. SCADA: Supervisory control and data acquisition.
124. SCCR: Short-circuit current rating.
125. SCR: Silicon-controlled rectifier.
126. SPD: Surge protective device.
127. sq.: Square.
128. SWD: Switching duty.
129. TCP/IP: Transmission Control Protocol/Internet Protocol. 130. TEFC: Totally enclosed fan-cooled.
131. TR: Tamper resistant.
132. TVSS: Transient voltage surge suppressor.
133. UL: (standards) UL Standards & Engagement Inc.; (product categories) UL, LLC. 134. UL CCN: UL Category Control Number.
135. UPS: Uninterruptible power supply.
136. USB: Universal serial bus.
137. UV: Ultraviolet.
138. V: Volt, unit of electromotive force.
139. V(ac): Volt, alternating current.
140. V(dc): Volt, direct current.
141. VA: Volt-ampere, unit of complex electrical power. 142. VAR: Volt-ampere reactive, unit of reactive electrical power. 143. VFC: Variable-frequency controller.
144. VOM: Volt-ohm-multimeter.
145. VoIP: Voice over Internet Protocol.
146. VPN: Virtual private network.
147. VRLA: Valve regulated lead acid; also called "sealed lead acid (SLA)" or "valve regulated sealed lead acid."
148. W: Watt, unit of real electrical power.
149. WAN: Wide area network.
150. Wh: Watt-hour, unit of electrical energy usage.
151. WPT: Wireless power transfer.
152. WPTE: Wireless power transfer equipment.
153. WR: Weather resistant.

Page 1425 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 5
B. Abbreviations and Acronyms for Electrical Raceway Types:

1. EMT: Electrical metallic tubing.

2. EMT-A: Aluminum electrical metallic tubing.

3. EMT-S: Steel electrical metallic tubing.

4. EMT-SS: Stainless steel electrical metallic tubing.

5. ENT: Electrical nonmetallic tubing.

6. EPEC: Electrical HDPE underground conduit (thin wall).

7. EPEC-A: Type A electrical HDPE underground conduit.

8. EPEC-B: Type B electrical HDPE underground conduit.

9. ERMC: Electrical rigid metal conduit.

10. ERMC-A: Aluminum electrical rigid metal conduit.

11. ERMC-S: Steel electrical rigid metal conduit.

12. ERMC-S-G: Galvanized-steel electrical rigid metal conduit.

13. ERMC-S-PVC: PVC-coated-steel electrical rigid metal conduit.

14. ERMC-SS: Stainless steel electrical rigid metal conduit.

15. FMC: Flexible metal conduit.

16. FMC-A: Aluminum flexible metal conduit.

17. FMC-S: Steel flexible metal conduit.

18. FMT: Steel flexible metallic tubing.

19. FNMC: Flexible nonmetallic conduit. See "LFNC."

20. HDPE: HDPE underground conduit (thick wall).

21. HDPE-40: Schedule 40 HDPE underground conduit.

22. HDPE-80: Schedule 80 HDPE underground conduit.

23. IMC: Steel electrical intermediate metal conduit.

24. LFMC: Liquidtight flexible metal conduit.

25. LFMC-A: Aluminum liquidtight flexible metal conduit.

26. LFMC-S: Steel liquidtight flexible metal conduit.

27. LFMC-SS: Stainless steel liquidtight flexible metal conduit.

28. LFNC: Liquidtight flexible nonmetallic conduit.

29. LFNC-A: Layered (Type A) liquidtight flexible nonmetallic conduit.

30. LFNC-B: Integral (Type B) liquidtight flexible nonmetallic conduit.

31. LFNC-C: Corrugated (Type C) liquidtight flexible nonmetallic conduit.

32. PVC: Rigid PVC conduit.

33. PVC-40: Schedule 40 rigid PVC conduit.

34. PVC-80: Schedule 80 rigid PVC Conduit.

35. PVC-A: Type A rigid PVC concrete-encased conduit.

36. PVC-EB: Type EB rigid PVC concrete-encased underground conduit.

37. RGS: See ERMC-S-G.

38. RMC: See ERMC.

39. RTRC: Reinforced thermosetting resin conduit.

40. RTRC-AG: Low-halogen, aboveground reinforced thermosetting resin conduit.

41. RTRC-AG-HW: Heavy wall, low-halogen, aboveground reinforced thermosetting resin conduit.

42. RTRC-AG-SW: Standard wall, low-halogen, aboveground reinforced thermosetting resin conduit.

43. RTRC-AG-XW: Extra heavy wall, low-halogen, aboveground reinforced thermosetting resin conduit.

44. RTRC-BG: Low-halogen, belowground reinforced thermosetting resin conduit.

Page 1426 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 6
C. Abbreviations and Acronyms for Electrical Single-Conductor and Multiple-Conductor Cable Types:

1. AC: Armored cable.

2. CATV: Coaxial general-purpose cable.

3. CATVP: Coaxial plenum cable.

4. CATVR: Coaxial riser cable.

5. CI: Circuit integrity cable.

6. CL2: Class 2 cable.

7. CL2P: Class 2 plenum cable.

8. CL2R: Class 2 riser cable.

9. CL2X: Class 2 cable, limited use.

10. CL3: Class 3 cable.

11. CL3P: Class 3 plenum cable.

12. CL3R: Class 3 riser cable.

13. CL3X: Class 3 cable, limited use.

14. CM: Communications general-purpose cable.

15. CMG: Communications general-purpose cable.

16. CMP: Communications plenum cable.

17. CMR: Communications riser cable.

18. CMUC: Under-carpet communications wire and cable.

19. CMX: Communications cable, limited use.

20. DG: Distributed generation cable.

21. FC: Flat cable.

22. FCC: Flat conductor cable.

23. FPL: Power-limited fire-alarm cable.

24. FPLP: Power-limited fire-alarm plenum cable.

25. FPLR: Power-limited fire-alarm riser cable.

26. IGS: Integrated gas spacer cable.

27. ITC: Instrumentation tray cable.

28. ITC-ER: Instrumentation tray cable, exposed run.

29. MC: Metal-clad cable.

30. MC-HL: Metal-clad cable, hazardous location.

31. MI: Mineral-insulated, metal-sheathed cable.

32. MTW: (machine tool wiring) Moisture-, heat-, and oil-resistant thermoplastic cable.

33. MV: Medium-voltage cable.

34. NM: Nonmetallic sheathed cable.

35. NMC: Nonmetallic sheathed cable with corrosion-resistant nonmetallic jacket.

36. NMS: Nonmetallic sheathed cable with signaling, data, and communications conductors, plus power or control conductors.

37. NPLF: Non-power-limited fire-alarm circuit cable.

38. NPLFP: Non-power-limited fire-alarm circuit cable for environmental air spaces.

39. NPLFR: Non-power-limited fire-alarm circuit riser cable.

40. NUCC: Nonmetallic underground HDPE conduit with conductors.

41. OFC: Conductive optical fiber general-purpose cable.

42. OFCG: Conductive optical fiber general-purpose cable.

43. OFCP: Conductive optical fiber plenum cable.

44. OFCR: Conductive optical fiber riser cable.

45. OFN: Nonconductive optical fiber general-purpose cable.

Page 1427 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 7

46. OFNG: Nonconductive optical fiber general-purpose cable.

47. OFNP: Nonconductive optical fiber plenum cable.

48. OFNR: Nonconductive optical fiber riser cable.

49. P: Marine shipboard cable.

50. PLTC: Power-limited tray cable.

51. PLTC-ER: Power-limited tray cable, exposed run.

52. PV: Photovoltaic cable.

53. RHH: (high heat) Thermoset rubber, heat-resistant cable.

54. RHW: Thermoset rubber, moisture-resistant cable.

55. SA: Silicone rubber cable.

56. SE: Service-entrance cable.

57. SER: Service-entrance cable, round.

58. SEU: Service-entrance cable, flat.

59. SIS: Thermoset cable for switchboard and switchgear wiring.

60. TBS: Thermoplastic cable with outer braid.

61. TC: Tray cable.

62. TC-ER: Tray cable, exposed run.

63. TC-ER-HL: Tray cable, exposed run, hazardous location.

64. THW: Thermoplastic, heat- and moisture-resistant cable.

65. THHN: Thermoplastic, heat-resistant cable with nylon jacket outer sheath.

66. THHW: Thermoplastic, heat- and moisture-resistant cable.

67. THWN: Thermoplastic, moisture- and heat-resistant cable with nylon jacket outer sheath.

68. TW: Thermoplastic, moisture-resistant cable.

69. UF: Underground feeder and branch-circuit cable.

70. USE: Underground service-entrance cable.

71. XHH: Cross-linked polyethylene, heat-resistant cable.

72. XHHW: Cross-linked polyethylene, heat- and moisture-resistant cable.

D. Abbreviations and Acronyms for Electrical Flexible Cord Types:

1. SEO: 600 V extra-hard-usage, hard-service cord with thermoplastic elastomer insulation and oil-resistant thermoplastic elastomer outer covering for damp locations.

2. SEOW: 600 V extra-hard-usage, hard-service cord with thermoplastic elastomer insulation and oil-resistant thermoplastic elastomer outer covering for damp or wet locations.

3. SEOO: 600 V extra-hard-usage, hard-service cord with oil-resistant thermoplastic elastomer insulation and oil-resistant thermoplastic elastomer outer covering for damp locations.

4. SEOOW: 600 V extra-hard-usage, hard-service cord with oil-resistant thermoplastic elastomer insulation and oil-resistant thermoplastic elastomer outer covering for damp or wet locations.

5. SJEO: 300 V hard-usage, junior hard-service cord with thermoplastic elastomer insulation and oil-resistant thermoplastic elastomer outer cover for damp locations.

6. SJEOW: 300 V hard-usage, junior hard-service cord with thermoplastic elastomer insulation and oil-resistant thermoplastic elastomer outer cover for damp or wet locations.

7. SJEOO: 300 V hard-usage, junior hard-service cord with oil-resistant

Page 1428 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 8
thermoplastic elastomer insulation and oil-resistant thermoplastic elastomer outer cover for damp locations.

8. SJEOOW: 300 V hard-usage, junior hard-service cord with oil-resistant thermoplastic elastomer insulation and oil-resistant thermoplastic elastomer outer cover for damp or wet locations.

9. SJO: 300 V hard-usage, junior hard-service cord with thermoset insulation and oil-resistant thermoset outer cover for damp locations.

10. SJOW: 300 V hard-usage, junior hard-service cord with thermoset insulation and oil-resistant thermoset outer cover for damp or wet locations.

11. SJOO: 300 V hard-usage, junior hard-service cord with oil-resistant thermoset insulation and oil-resistant thermoset outer cover for damp locations.

12. SJOOW: 300 V hard-usage, junior hard-service cord with oil-resistant thermoset insulation and oil-resistant thermoset outer cover for damp or wet locations.

13. SJTO: 300 V hard-usage, junior hard-service cord with thermoplastic insulation and oil-resistant thermoplastic outer cover for damp locations.

14. SJTOW: 300 V hard-usage, junior hard-service cord with thermoplastic insulation and oil-resistant thermoplastic outer cover for damp or wet locations.

15. SJTOO: 300 V hard-usage, junior hard-service cord with oil-resistant thermoplastic insulation and oil-resistant thermoplastic outer cover for damp locations.

16. SJTOOW: 300 V hard-usage, junior hard-service cord with oil-resistant thermoplastic insulation and oil-resistant thermoplastic outer cover for damp or wet locations.

17. SO: 600 V extra-hard-usage, hard-service cord with thermoset insulation and oilresistant thermoset outer covering for damp locations.

18. SOW: 600 V extra-hard-usage, hard-service cord with thermoset insulation and oil-resistant thermoset outer covering for damp or wet locations.

19. SOO: 600 V extra-hard-usage, hard-service cord with oil-resistant thermoset insulation and oil-resistant thermoset outer covering for damp locations.

20. SOOW: 600 V extra-hard-usage, hard-service cord with oil-resistant thermoset insulation and oil-resistant thermoset outer covering for damp or wet locations.

21. STO: 600 V extra-hard-usage, hard-service cord with thermoplastic insulation and oil-resistant thermoplastic outer covering for damp locations.

22. STOW: 600 V extra-hard-usage, hard-service cord with thermoplastic insulation and oil-resistant thermoplastic outer covering for damp or wet locations.

23. STOO: 600 V extra-hard-usage, hard-service cord with oil-resistant thermoplastic insulation and oil-resistant thermoplastic outer covering for damp locations.

24. STOOW: 600 V extra-hard-usage, hard-service cord with oil-resistant thermoplastic insulation and oil-resistant thermoplastic outer covering for damp or wet locations.

E. Definitions:

1. 8-Position 8-Contact (8P8C) Modular Jack: An unkeyed jack with up to eight contacts commonly used to terminate twisted pair and multiconductor Ethernet cable. Also called a "TIA-1096 miniature 8-position series jack" (8PSJ), or an "IEC 8877 8-pole jack."
a. Be careful when suppliers use "RJ45" generically. Obsolete RJ45 jacks used for analog telephone cables have rejection keys. 8P8C jacks used for

Page 1429 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 9
digital telephone cables and Ethernet cables do not have rejection keys.

2. Basic Impulse Insulation Level (BIL): Reference insulation level expressed in impulse crest voltage with a standard wave not longer than 1.5 times 50 microseconds and 1.5 times 40 microseconds.

3. Cable: In accordance with NIST NBS Circular 37 and IEEE standards, in the United States for the purpose of interstate commerce, the definition of "cable" is (1) a conductor with insulation, or a stranded conductor with or without insulation (single-conductor cable); or (2) a combination of conductors insulated from one another (multiple-conductor cable).

4. Communications Jack: A fixed connecting device designed for insertion of a communications cable plug.

5. Communications Outlet: One or more communications jacks, or cables and plugs, mounted in a box or ring, with a suitable protective cover.

6. Conductor: In accordance with NIST NBS Circular 37 and IEEE standards, in the United States for the purpose of interstate commerce, the definition of "conductor" is (1) a wire or combination of wires not insulated from one another, suitable for carrying an electric current; (2) (National Electrical Safety Code) a material, usually in the form of wire, cable, or bar, suitable for carrying an electric current; or (3) (general) a substance or body that allows a current of electricity to pass continuously along it.

7. Conduit: A structure containing one or more duct raceways.

8. Designated Seismic System: An architectural, electrical, or mechanical system and its components for which the component importance factor is greater than

1.0 when determined in accordance with Section 018123 "Facility Seismic and Wind Criteria."

9. Direct Buried: Installed underground without encasement in concrete or other protective material.

10. Duct Bank: An arrangement of conduit providing one or more continuous duct raceways between two points.

11. Duct Raceway: A single enclosed raceway for conductors or cable.

12. Electrical Service: The conductors and equipment for delivering electric energy from the serving utility to the wiring system of the premises served.

13. Enclosure: The case or housing of an apparatus, or the fence or wall(s) surrounding an installation, to prevent personnel from accidentally contacting energized parts or to protect the equipment from physical damage. Types of enclosures and enclosure covers include the following:
a. Cabinet: An enclosure that is designed for either surface mounting or flush mounting and is provided with a frame, mat, or trim in which a swinging door or doors are or can be hung.
b. Concrete Box: A box intended for use in poured concrete. c. Conduit Body: A means for providing access to the interior of a conduit or tubing system through one or more removable covers at a junction or terminal point. In the United States, conduit bodies are listed in accordance with outlet box requirements.
d. Conduit Box: A box having threaded openings or knockouts for conduit, EMT, or fittings.
e. Cover Plate: A cover designed for protecting wiring devices installed in flush-mounted device boxes while permitting their safe operation; also

Page 1430 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 10
called a faceplate or wallplate.
f. Cutout Box: An enclosure designed for surface mounting that has swinging doors or covers secured directly to and telescoping with the walls of the enclosure.
g. Device Box: A box with provisions for mounting a wiring device directly to the box.
h. Extension Ring: A ring intended to extend the sides of an outlet box or device box to increase the box depth, volume, or both.
i. Floor Box: A box mounted in the floor intended for use with a floor box cover and other components to complete the floor box enclosure. j. Floor-Mounted Enclosure: A floor box and floor box cover assembly with means to mount in the floor that is sealed against the entrance of scrub water at the floor level.
k. Floor Nozzle: An enclosure used on a wiring system, intended primarily as a housing for a receptacle, provided with a means, such as a collar, for surface-mounting on a floor, which may or may not include a stem to support it above the floor level, and is sealed against the entrance of scrub water at the floor level.
l. Junction Box: A box with a blank cover that joins different runs of raceway or cable and provides space for connection and branching of the enclosed conductors.
m. Outlet Box: A box that provides access to a wiring system having pryout openings, knockouts, threaded entries, or hubs in either the sides or the back, or both, for the entrance of conduit, conduit or cable fittings, or cables, with provisions for mounting an outlet box cover, but without provisions for mounting a wiring device directly to the box. n. Pedestal Floor Box Cover: A floor box cover that, when installed as intended, provides a means for typically vertical or near-vertical mounting of receptacle outlets above the floor's finished surface. o. Pull Box: A box with a blank cover that joins different runs of raceway and provides access for pulling or replacing the enclosed cables or conductors. p. Raised-Floor Box: A floor box intended for use in raised floors. q. Recessed Access Floor Box: A floor box with provisions for mounting wiring devices below the floor surface.
r. Recessed Access Floor Box Cover: A floor box cover with provisions for passage of cords to recessed wiring devices mounted within a recessed floor box.
s. Ring: A sleeve, which is not necessarily round, used for positioning a recessed wiring device flush with the plaster, concrete, drywall, or other wall surface.
t. Ring Cover: A box cover, with raised center portion to accommodate a specific wall or ceiling thickness, for mounting wiring devices or luminaires flush with the surface.
u. Termination Box: An enclosure designed for installation of termination base assemblies consisting of bus bars, terminal strips, or terminal blocks with provision for wire connectors to accommodate incoming or outgoing conductors, or both.

14. Emergency Systems: Those systems legally required and classed as emergency by municipal, state, federal, or other codes, or by any governmental agency

Page 1431 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 11
having jurisdiction that are designed to ensure continuity of lighting, electrical power, or both, to designated areas and equipment in the event of failure of the normal supply for safety to human life.

15. Essential Electrical Systems: (healthcare facilities) Those systems designed to ensure continuity of electrical power to designated areas and functions of a healthcare facility during disruption of normal power sources, and also to minimize disruption within the internal wiring system.

16. Fault Limited: Providing or being served by a source of electrical power that is limited to not more than 100 W when tested in accordance with UL 62368-1. a. The term "fault limited" is intended to encompass most Class 1, 2, and 3 power-limited sources complying with Article 725 of NFPA 70; Class ES1 and ES2 electrical energy sources that are Class PS1 electrical power sources (e.g., USB); and Class ES3 electrical energy sources that are Class PS1 and PS2 electrical power sources (e.g., PoE). See UL 62368-1 for discussion of classes of electrical energy sources and classes of electrical power sources.

17. High-Performance Building: A building that integrates and optimizes on a lifecycle basis all major high-performance attributes, including energy conservation, environment, safety, security, durability, accessibility, cost-benefit, productivity, sustainability, functionality, and operational considerations.

18. Jacket: A continuous nonmetallic outer covering for conductors or cables.

19. Luminaire: A complete lighting unit consisting of a light source such as a lamp, together with the parts designed to position the light source and connect it to the power supply. It may also include parts to protect the light source or the ballast or to distribute the light.

20. Mode: The terms "Active Mode," "Off Mode," and "Standby Mode" are used as defined in the Energy Independence and Security Act (EISA) of 2007.

21. Multi-Outlet Assembly: A type of surface, flush, or freestanding raceway designed to hold conductors, receptacles, and switches, assembled in the field or at the factory.

22. One-Line Diagram: A diagram that shows, by means of single lines and graphic symbols, the course of an electric circuit or system of circuits and the component devices or parts used therein. Also called "single-line diagram."

23. Plenum: A compartment or chamber to which one or more air ducts are connected and that forms part of the air distribution system.

24. Protective Device: A device that senses when an abnormal current flow, abnormal voltage potential, or other abnormal electrical waveform exists and then disconnects the affected portion of the circuit from the system. Common protective devices include fuses, circuit breakers, relays, ground-fault circuit interrupters, and arc-fault circuit interrupters.

25. Public Switched Telephone Network (PSTN): Analog telephone technology that uses twisted pair cables from a telephone-provider central office for the transmission medium. "PSTN" refers to the telephone network; "POTS" refers to the individual subscriber line.

26. Receptacle: A fixed connecting device arranged for insertion of a power cord plug. Also called a power jack.

27. Receptacle Outlet: One or more receptacles mounted in a box with a suitable protective cover.

Page 1432 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 12

28. Sheath: A continuous metallic covering for conductors or cables.

29. UL Category Control Number (CCN): An alphabetic or alphanumeric code used to identify product categories covered by UL's Listing, Classification, and Recognition Services.

30. Voice over Internet Protocol (VoIP): Digital telephone packet technology that uses the internet for its transmission medium.

31. Voltage Class: For specified circuits and equipment, voltage classes are defined as follows:
a. Control Voltage: Having electromotive force between any two conductors, or between a single conductor and ground, that is supplied from a battery or other Class 2 or Class 3 power-limited source.
b. Line Voltage: (1) (controls) Designed to operate using the supplied lowvoltage power without transformation. (2) (transmission lines, transformers, SPDs) The line-to-line voltage of the supplying power system. c. Extra-Low Voltage (ELV): Not having electromotive force between any two conductors, or between a single conductor and ground, exceeding 30 V(ac rms), 42 V(ac peak), or 60 V(dc).
d. Low Voltage (LV): Having electromotive force between any two conductors, or between a single conductor and ground, that is rated above 30 V but not exceeding 1000 V.
e. Medium Voltage (MV): Having electromotive force between any two conductors, or between a single conductor and ground, that is rated about 1 kV but not exceeding 69 kV.
f. High Voltage: (1) (circuits) Having electromotive force between any two conductors, or between a single conductor and ground, that is rated above 69 kV but not exceeding 230 kV. (2) (safety) Having sufficient electromotive force to inflict bodily harm or injury.

32. Wire: In accordance with NIST NBS Circular 37 and IEEE standards, in the United States for the purpose of interstate commerce, the definition of "wire" is a slender rod or filament of drawn metal. A group of small wires used as a single wire is properly called a "stranded wire." A wire or stranded wire covered with insulation is properly called an "insulated wire" or a "single-conductor cable." Nevertheless, when the context indicates that the wire is insulated, the term "wire" will be understood to include the insulation.

1.3 COORDINATION
A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions:

1. Notify [Architect][Construction Manager][Owner][Tenant] no fewer than [seven]<Insert number> days in advance of proposed interruption of electrical service.

2. Do not proceed with interruption of electrical service without [Architect's][Construction Manager's][Owner's][Tenant's] written permission.

3. Coordinate interruption with systems impacted by outage including, but not limited to, the following:

Page 1433 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 13
a. Exercising generators.
b. Emergency lighting.
c. Elevators.
d. Fire-alarm systems.

4. Arrange to provide temporary emergency and standby electrical [service][or][power] so facility may remain occupied during the outage in accordance with requirements specified in Section 015000 "Temporary Facilities and Controls." Coordinate power requirements with Owner.

B. Interruption of Existing Telephone Service: Do not interrupt telephone service to facilities occupied by Owner or others unless permitted under the following conditions:

1. Notify [Architect][Construction Manager][Owner][Tenant] no fewer than [seven]<Insert number> days in advance of proposed interruption of telephone service.

2. Do not proceed with interruption of telephone service without [Architect's][Construction Manager's][Owner's][Tenant's] written permission.

C. Interruption of Existing Internet Service: Do not interrupt internet service to facilities occupied by Owner or others unless permitted under the following conditions:

1. Notify [Architect][Construction Manager][Owner][Tenant] no fewer than [seven]<Insert number> days in advance of proposed interruption of internet service.

2. Do not proceed with interruption of internet service without [Architect's][Construction Manager's][Owner's][Tenant's] written permission.

D. Interruption of Existing Security System: Do not interrupt security system to facilities occupied by Owner or others unless permitted under the following conditions:

1. Notify [Architect][Construction Manager][Owner][Tenant] no fewer than [seven]<Insert number> days in advance of proposed interruption of security system.

2. Do not proceed with interruption of security system without [Architect's][Construction Manager's][Owner's][Tenant's] written permission.

E. Interruption of Existing Fire-Alarm System: Do not interrupt fire-alarm system to facilities occupied by Owner or others unless permitted under the following conditions:

1. Notify [Architect][Construction Manager][Owner][Tenant] no fewer than [seven]<Insert number> days in advance of proposed interruption of fire-alarm system.

2. Do not proceed with interruption of fire-alarm system without [Architect's][Construction Manager's][Owner's][Tenant's] written permission.

1.4 PREINSTALLATION MEETINGS
A. Electrical Preconstruction Conference: Schedule conference with Architect and Owner, not later than [10]<Insert number> days after Notice to Proceed. Agenda topics

Page 1434 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 14
include, but are not limited to, the following:

1. Electrical installation schedule.

2. Status of power system studies.

3. Value analysis proposals and requests for substitution of electrical equipment.

4. Utility work coordination and class of service requests.

5. Commissioning activities.

6. Sustainability activities[, including Measurement and Verification Plan].

B. Communications Preconstruction Conference: Schedule conference with Architect and Owner not later than [10]<Insert number> days after Notice to Proceed. Agenda topics include, but are not limited to, the following:

1. Installation schedule for communications systems.

2. Value analysis proposals and requests for substitution of communications equipment.

3. Utility services work coordination and monitoring service requests.

4. Commissioning activities.

5. Sustainability activities.

C. Electronic Safety and Security Preconstruction Conference: Schedule conference with Architect and Owner not later than [10]<Insert number> days after Notice to Proceed.

Agenda topics include, but are not limited to, the following:

1. Installation schedule for security, fire-alarm, and other life-safety systems.

2. Value analysis proposals and requests for substitution of electronic safety and security equipment.

3. Monitoring services work coordination and monitoring service requests.

4. Commissioning activities.

5. Sustainability activities.

1.5 SEQUENCING
A. Conduct and submit results of power system studies before submitting product data and Shop Drawings for electrical equipment.

1.6 SCHEDULING
A. <Insert requirements for unusual scheduling coordination>.

1.7 ACTION SUBMITTALS
A. Coordination Drawings for Structural Supports: Show coordination of structural supports for equipment and devices, including restraints and bracing for control of seismic and wind loads, with other systems, equipment, and structural supports in the vicinity.

B. Coordination Drawings for Ceiling Areas: Where indicated on drawings, provide

Page 1435 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 15
reflected ceiling plan(s), supplemented by sections and other details, drawn to scale, in accordance with Section 013100 "Project Management and Coordination," on which the following items are shown and coordinated with each other, using input from installers of the items involved:

1. Suspended ceiling components.

2. Structural members to which equipment and suspension systems will be attached.

3. Size and location of access panels on ceilings.

4. Elevation, size, and route of sprinkler piping.

5. Elevation, size, and route of plumbing piping.

6. Elevation, size, and route of ductwork.

7. Elevation, size, and route of cable tray.

8. Elevation, size, and route of conduit.

9. Elevation and size of wall-mounted and ceiling-mounted equipment.

10. Access panels.

11. Sprinklers.

12. Air inlets and outlets.

13. Control modules.

14. Luminaires.

15. Communications devices.

16. Speakers.

17. Security devices.

18. Fire-alarm devices.

19. Indicate clear dimensions for maintenance access in front of equipment.

20. Indicate dimensions of fully open access doors.

C. Coordination Drawings for Cable Tray Routing: Reflected ceiling plan(s), supplemented by sections and other details, drawn to scale, in accordance with Section 013100 "Project Management and Coordination," on which the following items are shown and coordinated with each other, using input from installers of the items involved:

1. Elevation, size, and route of cable trays.

2. Relationships between components and adjacent structural, electrical, and mechanical elements.

3. Vertical and horizontal offsets and transitions.

4. Elevation and size of sleeves for wall, ceiling, and floor cable penetrations.

5. Elevation of ceilings and size of ceiling tiles.

6. Locations of access panels on ceilings.

7. Locations where cable tray crosses or parallels sprinkler piping.

8. Locations where cable tray crosses plumbing piping.

9. Locations where cable tray crosses or parallels ductwork.

10. Locations of access panels on ductwork.

11. Locations where cable tray crosses conduit.

12. Items blocking access around cable trays, including the following:
a. Light fixtures.
b. Speakers.
c. Fire-alarm devices.
d. Power outlets.

Page 1436 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 16
e. Wall-mounted equipment.
f. Equipment racks.
g. Furniture.
h. Door swings.
i. Building features.

13. Indicate clear dimension between cable tray and walls or obstructions that are closer than 10 ft.

14. Highlight locations where cable tray is greater than 3 ft above ceilings. Explain how personnel access will be accommodated for cable tray maintenance.

D. Coordination Drawings for Conduit Routing: Conduit routing plans, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of items involved:

1. Structural members in paths of conduit groups with common supports.

2. HVAC and plumbing items and architectural features in paths of conduit groups with common supports.

E. Coordination Drawings for Bus Assembly Routing: Floor plans and sections, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of items involved:

1. Scaled bus-assembly layouts and relationships between components and adjacent structural, mechanical, and electrical elements.

2. Vertical and horizontal enclosed bus-assembly runs, offsets, and transitions.

3. Clearances for access above and to the side of enclosed bus assemblies.

4. Vertical elevation of enclosed bus assemblies above the floor or bottom of structure.

5. Support locations, type of support, and weight on each support.

6. Location of adjacent construction elements, including luminaires, HVAC and plumbing equipment, fire sprinklers and piping, signal and control devices, and other equipment.

F. Coordination Drawings for Large Equipment Indoor Installations:

1. Location plan, drawn to scale, showing heavy equipment or truck access paths to loading dock or other freight access into building. Indicate available width and height of doors or openings.

2. Floor plan for entry floor and floor where equipment is located, drawn to scale, showing heavy equipment access paths for maintenance and replacement, with the following items shown and coordinated with each other, based on input from installers of the items involved:
a. Dimensioned concrete bases, outlines of equipment, conduit entries, and grounding equipment locations.
b. If freight elevator must be used, indicate width and height of door and depth of car. Indicate if large equipment must be tipped to use elevator. c. Dimensioned working clearances and dedicated areas below and around electrical equipment where obstructions and tripping hazards are

Page 1437 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 17
prohibited.

3. Reflected ceiling plans for entry floor and floor where equipment is located, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved:
a. Support locations, type of support, and weight on each support. Locate structural supports for structure-supported raceways[, busways,][and seismic bracing].
b. Location of lighting fixtures, sprinkler piping and sprinklers, ducts and diffusers, and other obstructions, indicating available overhead clearance. c. Dimensioned working clearances and dedicated areas above and around electrical equipment where foreign systems and equipment are prohibited.

G. Coordination Drawings for Large Equipment Outdoor Installations:

1. Utilities site plan, drawn to scale, showing heavy equipment or truck access paths for maintenance and replacement, with the following items shown and coordinated with each other, based on input from installers of the items involved:
a. Fences and walls, dimensioned concrete bases, outlines of equipment, conduit entries, and grounding and bonding locations.
b. Indicate clear dimensions for fence gates and wall openings. c. Indicate depth and type of ground cover, and locations of trees, shrubbery, and other obstructions in access path.
d. Indicate clear height below tree branches, overhead lines, bridges, and other overhead obstructions in access path, or where cranes and hoists will be needed to handle large electrical equipment.
e. Support locations, type of support, and weight on each support. Locate structural supports for structure-supported raceways[, busways,][and seismic bracing].
f. Dimensioned working clearances and dedicated areas around electrical equipment.

H. Coordination Drawings for Duct Banks:

1. Show duct profiles and coordination with other utilities and underground structures.

2. Include plans and sections, drawn to scale, and show bends and locations of expansion fittings.

I. Sustainable Design Submittals:

1.8 INFORMATIONAL SUBMITTALS
A. Electrical Installation Schedule: At preconstruction meeting, and periodically thereafter as dates change, provide schedule for electrical installation Work to Owner and Architect including, but not limited to, milestone dates for the following activities:

1. Submission of power system studies.

Page 1438 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 18

2. Submission of specified coordination drawings.

3. Submission of action submittals specified in Division 26.

4. Orders placed for major electrical equipment.

5. Arrival of major electrical equipment on-site.

6. Preinstallation meetings specified in Division 26.

7. Utility service outages.

8. Utility service inspection and activation.

9. Mockup reviews.

10. Closing of walls and ceilings containing electrical Work.

11. System startup, testing, and commissioning activities for major electrical equipment.

12. System startup, testing, and commissioning activities for emergency lighting.

13. System startup, testing, and commissioning activities for automation systems (SCADA, BMS, lighting, HVAC, fire alarm, fire pump, etc.).

14. Pouring of concrete housekeeping pads for electrical equipment and testing of concrete samples.

15. Requests for special inspections.

16. Requests for inspections by authorities having jurisdiction.

B. Installation Schedule for Communications Systems: At preconstruction meeting, and periodically thereafter as dates change, provide schedule for installation of the communications Work to Owner and Architect including, but not limited to, milestone dates for the following activities:

1. Submission of specified coordination drawings.

2. Submission of action submittals specified in Division 27.

3. Orders placed for major equipment.

4. Arrival of major equipment on-site.

5. Preinstallation meetings specified in Division 27.

6. Telephone and internet service outages.

7. Telephone and internet service inspection and activation.

8. Mockup reviews.

9. Closing of walls and ceilings containing the communications Work.

10. System startup, testing, and commissioning activities for communications equipment.

11. System startup, testing, and commissioning activities for the Work specified in other divisions that depends on the Work specified in Division 27.

12. System startup, testing, and commissioning activities for automation systems (SCADA, BMS, lighting, HVAC, fire alarm, fire pump, etc.).

13. Requests for special inspections.

14. Requests for inspections by authorities having jurisdiction.

C. Installation Schedule for Security, Fire-Alarm, and Other Life-Safety Systems: At preconstruction meeting, and periodically thereafter as dates change, provide schedule for installation of security, fire-alarm, and the other life-safety Work to Owner and Architect including, but not limited to, milestone dates for the following activities:

1. Submission of specified coordination drawings.

2. Submission of action submittals specified in Division 28.

3. Orders placed for major equipment.

Page 1439 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 19

4. Arrival of major equipment on-site.

5. Preinstallation meetings specified in Division 28.

6. Security and fire-alarm system outages.

7. Security and fire-alarm system inspection and activation.

8. Mockup reviews.

9. Closing of walls and ceilings containing the security and fire-alarm Work.

10. System startup, testing, and commissioning activities for security and fire-alarm equipment.

11. System startup, testing, and commissioning activities for fire-alarm interfaces with the Work specified in other divisions.

12. System startup, testing, and commissioning activities for automation systems (SCADA, BMS, lighting, HVAC, fire alarm, fire pump, etc.).

13. Requests for special inspections.

14. Requests for inspections by authorities having jurisdiction.

D. Welding certificates.

E. Seismic Performance Certificates: Provide special certification for designated seismic systems as required to meet requirements specified in Section 018123 "Facility Seismic and Wind Criteria" for all designated seismic systems identified on the Drawings or in the Specifications.

1. Include the following information:
a. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.
b. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. c. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements. d. Detailed description of conduit support devices and interconnections on which the certification is based and their installation requirements. e. Equipment manufacturer's written certification for each designated active electrical seismic device and system, stating that it will remain operable following the basis-of-design seismic criteria specified in Section 018123 "Facility Seismic and Wind Criteria."
f. Equipment manufacturer's written certification that components with hazardous contents maintain containment following the basis-of-design seismic criteria specified in Section 018123 "Facility Seismic and Wind Criteria."
g. Evidence demonstrating compliance with these requirements for approval to authorities having jurisdiction after review and acceptance by qualified structural professional engineer.

F. Wind Performance Certificates: Provide special certification for systems and components designated on the Drawings or in the Specifications to be subject to high wind exposure and impact damage.

1. Include the following information:

Page 1440 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 20
a. Provide equipment manufacturer's written certification for each designated system and component, stating that it will remain in place and operable following the design wind event and comply with requirements of authorities having jurisdiction.
b. Certification must be based on ICC-ES or similar nationally recognized testing standard procedures acceptable to authorities having jurisdiction.

G. Qualification Statements:

1. For qualified regional manufacturer.

2. For structural professional engineer.

3. For electrical professional engineer.

4. For lighting professional engineer.

5. For EPM specialist.

6. For welder.

7. For ERMC-S-PVC raceway Installer.

8. For medium-voltage cable Installer.

9. For medium-voltage duct Installer.

10. For medium-voltage equipment Installer.

11. For electrical power monitoring Installer.

12. For switchboard Installer.

13. For EVSE Installer.

14. For generator set Installer.

15. For lightning protection system Installer.

16. For theatrical lighting Installer.

17. For exterior athletic lighting Installer.

18. For power quality specialist.

19. For [medium-voltage and]low-voltage electrical testing agency and on-site electrical testing supervisor.

20. For power-limited electrical testing agency and on-site power-limited testing supervisor.

21. For structural testing and inspecting agency.

22. For outdoor pole testing and inspecting agency.

23. For luminaire photometric testing laboratory.

24. For lighting testing and inspecting agency.

25. For communications design professional.

26. For communications cable Installer.

27. For communications testing agency and on-site communications testing supervisor.

28. For security design professional.

29. For life-safety professional engineer.

30. For fire-alarm cable Installer.

31. For security testing agency and on-site security testing supervisor.

32. For fire-alarm testing agency and on-site fire-alarm testing supervisor.

1.9 CLOSEOUT SUBMITTALS
A. Facility EMP Binders:

Page 1441 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 21

1. Complete Set: On [approved online or cloud solution][and][USB media that is clearly and permanently labeled with attached placard on lanyard to prevent misplacement].

2. Volumes 2 and 8: Reproducible hardcopy on archival quality, 28 lb, acid-free, bond paper.

B. Operation and Maintenance Data:

1. Provide emergency operation, normal operation, and preventive maintenance manuals for each system, equipment, and device listed below:
a. <Insert system, equipment, or device>.

2. Include the following information:
a. Manufacturer's operating specifications.
b. User's guides for software and hardware.
c. Schedule of maintenance material items recommended to be stored at the Project site.
d. Detailed instructions covering operation under both normal and abnormal conditions.
e. Time-current curves for overcurrent protective devices and manufacturer's written instructions for testing and adjusting their settings. f. List of load-current and overload-relay heaters with related motor nameplate data.
g. List of lamp types and photoelectric relays used on the Project, with ANSI and manufacturers' codes.
h. Manufacturer's instructions for setting field-adjustable components. i. Manufacturer's instructions for testing, adjusting, and reprogramming microprocessor controls.
j. EPSS: Manufacturer's system checklists, maintenance schedule, and maintenance log sheets in accordance with NFPA 110.
k. Exterior pole inspection and repair procedures.

C. Software and Firmware Operational Documentation: Provide software and firmware operational documentation[ in Facility EPM Binders], including the following:

1. Software operating and upgrade manuals.

2. Names, versions, and website addresses for locations of installed software.

3. Device address list.

4. Printout of software application and graphic screens.

5. Testing and adjusting of panic and emergency power features.

6. For lighting controls, include the following:
a. Adjustments of scene preset controls, adjustable fade rates, and fade overrides.
b. Operation of adjustable zone controls.

D. Software:

1. Program Software Backup: Provide [username and password for approved online

Page 1442 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 22
or cloud solution][and][USB media that is clearly and permanently labeled with attached placard on lanyard to prevent misplacement].

2. Provide to Owner upgrades and unrestricted licenses[ for Government use] for installed and backup software, including operating systems and programming tools required for operation and maintenance.

1.10 MOCKUPS
A. Simple Mockups for Coordinating Accessibility of Electrical Devices around Fixed Furnishings and Equipment:

1. Build simple mockups using art supplies and other inexpensive materials for verification of general arrangement, actual dimensions, and accessibility of <Insert identification of room and fabrication> by
[Architect][Owner][Tenant]<Insert approving stakeholders> prior to fabrication and installation of Work. Depict products from all Divisions requiring coordination, including, but not limited to, fixed furnishings, casework, outlet covers and plates, HVAC controls, exposed raceway, exposed plumbing, equipment, and signage.

B. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Owner specifically approves such deviations by Change Order.

PART 2 - PRODUCTS

2.1 SUBSTITUTION LIMITATIONS FOR ELECTRICAL EQUIPMENT
A. Substitution requests for electrical equipment will be entertained under the following conditions:

1. Substitution requests may be submitted for consideration prior to the Electrical Preconstruction Conference if accompanied by value analysis data indicating that substitution will comply with the Project performance requirements while significantly increasing value for Owner throughout life of facility.

2. Substitution requests may be submitted for consideration concurrently with submission of power system study reports when those reports indicate that substitution is necessary for safety of maintenance personnel and facility occupants.

3. Contractor is responsible for sequencing and scheduling power system studies and electrical equipment procurement. After the Electrical Preconstruction Conference, insufficient lead time for electrical equipment delivery will not be considered a valid reason for substitution.

2.2 SUBSTITUTION LIMITATIONS FOR COMMUNICATIONS EQUIPMENT A. Substitution requests for communications equipment will be entertained under the following conditions:

Page 1443 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 23

1. Substitution requests may be submitted for consideration prior to the Communications Preconstruction Conference if accompanied by value analysis data indicating that substitution will comply with the Project performance requirements while significantly increasing value for Owner throughout life of facility.

2. Contractor is responsible for sequencing and scheduling equipment procurement. After the Communications Preconstruction Conference, insufficient lead time for equipment delivery will not be considered a valid reason for substitution.

2.3 SUBSTITUTION LIMITATIONS FOR ELECTRONIC SAFETY AND SECURITY

EQUIPMENT
A. Substitution requests for electronic safety and security equipment will be entertained under the following conditions:

1. Substitution requests may be submitted for consideration prior to the Electronic Safety and Security Preconstruction Conference if accompanied by value analysis data indicating that substitution will comply with the Project performance requirements while significantly increasing value for Owner throughout life of facility.

2. Contractor is responsible for sequencing and scheduling equipment procurement. After the Electronic Safety and Security Preconstruction Conference, insufficient lead time for equipment delivery will not be considered a valid reason for substitution.

2.4 FACILITY ELECTRICAL MAINTENANCE PROGRAM (EMP) BINDERS A. Description: Set of binders containing operation and maintenance data for facility's electrical equipment that was compiled during analysis of installed electrical Work for Facility EMP development.

B. Applicable Standards:

1. Regulatory Requirements: Comply with requirements in NFPA 70B.

2. General Characteristics:
a. Volume 1 - Introduction:
1) Summarize how Facility EMP analysis was performed, how data were collected, and how volumes are organized.
2) Describe Facility EMP and provide recommended policies and procedures for implementing the program and keeping it current. 3) Provide place for Owner to identify contact information for employees responsible for implementing and maintaining Facility EMP. b. Volume 2 - Facility Safety, Hazards Awareness, and Emergency Procedures:

Page 1444 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 24
1) Include training requirements for employees and contractors. 2) Include list of known facility hazards impacting IT&R activities. 3) Include approval and permitting procedures for IT&R activities. 4) Include incident emergency response procedures.
5) Include emergency shutdown procedures.
6) Include electrical disaster recovery procedures.
7) Include procedures for investigating the following incidents:
a) Electrical safety incidents.
b) Equipment malfunctions.
c) Unintended operations or alarms.
d) Operation of protective devices.
c. Volume 3 - Operating Procedures for Electrical Equipment and Controls:
1) <Insert requirements>.
d. Volume 4 - Facility Diagrams and Schedules:
1) Include single-line diagrams.
2) Include grounding and bonding diagrams.
3) Include essential wiring diagrams.
4) Include system automation diagrams (SCADA, BMS, lighting, HVAC, etc.).
5) Include records of switchgear, switchboard, and panelboard schedules.
6) Include time-current curves for overcurrent protective devices. 7) Include list of load-current and overload-relay heaters with related motor nameplate data.
e. Volume 5 - Inventory of Facility Equipment Using Electrical Power:
1) Include simplified floor plans showing equipment locations. 2) Identify critical equipment (electrical or otherwise). 3) Include identifying designations and nameplate data. 4) Include warranty and maintenance contract information. f. Volume 6 - Inventory of Facility Tools, Supplies, and Personnel Protective Equipment:
1) Include schedules of maintenance material items recommended to be stored at facility.
2) Include list of lamp types and photoelectric relays used in facility with ANSI and manufacturers' codes.
3) Include calibration and servicing data for each item. g. Volume 7 - Inspection, Testing, and Repair (IT&R) Plan:
1) Include tables showing frequency of activities for each item. 2) Include annual schedule with activities mapped to specific days of the year.

Page 1445 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 25
3) Include exterior pole inspection and repair procedures. h. Volume 8 - Inspection, Testing, and Repair (IT&R) Forms:
1) <Insert requirements>.
i. Volume 9 - Inspection, Testing, and Repair (IT&R) Procedures:
1) <Insert requirements>.
j. Volume 10 - Spare Parts List:
1) Include list of all parts required to perform IT&R procedures. 2) Identify quantities of which parts are recommended to be stored onsite. 3) Include source contact information and budget cost for each item. k. Volume 11 - Construction Project Closeout Record Documentation:
1) Include records of power system studies and photometric studies. 2) Include records of risk assessment studies.
3) Include records of electrical system startup and commissioning activities.
4) Include records of baseline inspections and tests.
5) Include records of baseline infrared photographs with normal light photographs showing the location, direction, angle, and conditions necessary for reproducing each infrared photograph.
6) Include records of baseline settings for adjustable equipment and devices.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Verification of Conditions:

1. <Insert Project requirements>.

B. Preinstallation Testing:

1. <Insert Project requirements>.

C. Evaluation and Assessment:

1. <Insert Project requirements>.

Page 1446 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 26

3.2 PREPARATION
A. Protection of In-Place Conditions:

1. <Insert Project requirements>.

3.3 DEVELOPMENT OF FACILITY ELECTRICAL MAINTENANCE PROGRAM (EMP) A. Facility EMP must be developed by qualified EMP specialist.

B. Conduct Facility EMP analysis in accordance with NFPA 70B requirements.

1. Renovation Projects:
a. Facility diagrams must include connected existing equipment for entire facility where known. Areas of uncertainty should be clearly indicated. b. Obtain copies of existing operation and maintenance data and existing Facility EMP information from Owner.
c. Facility EMP analysis should identify existing equipment that does not have available operation and maintenance data, and should explain Owner's risks because this equipment is not included in Facility EMP. d. Data for existing equipment outside scope of the Project may be inserted in Facility EMP Binders without analysis.
e. Data for existing equipment impacted by scope of the Project should be analyzed and documented similar to the Project's new equipment data as much as possible.

C. Compile operation and maintenance data from Facility EMP analysis and submit [updated]Facility EMP Binders.

3.4 INSTALLATION OF ELECTRICAL WORK
A. Unless more stringent requirements are specified in the Contract Documents or manufacturers' written instructions, comply with NFPA 70 and NECA NEIS 1 for installation of electrical Work on the Project. Consult Architect for resolution of conflicting requirements.

3.5 CLEANING
A. Electrical or Electronic Waste Management:

1. <Insert requirements for special handling or diversion of electrical and electronics waste for recycling or disposal>.

3.6 CLOSEOUT ACTIVITIES
A. Training:

Page 1447 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SUPPLEMENTAL REQUIREMENTS FOR

ELECTRICAL
260010 - 27

1. [With assistance from factory-authorized service representatives, train][Train] Owner's maintenance personnel on the following topics:
a. How to implement [updated]Facility EMP.
b. <Insert system or equipment>.

2. [Provide video recordings of training sessions to Owner.][Allow Owner to record training sessions.]
END OF SECTION 260010

Page 1448 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES
260519 - 1
SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL

1.1 SUMMARY
A. Related Requirements:

1. Section 018116 "Facility Environmental Requirements" specifies basis-of-design environmental conditions and performance criteria that are applicable to product selection and installation of the Work on the Project.

2. Section 018123 "Facility Seismic and Wind Criteria" specifies basis-of-design seismic and wind criteria for nonstructural components on the Project.

3. Section 260010 "Supplemental Requirements for Electrical" specifies additional requirements applicable to coordinating, scheduling, and sequencing of the Work specified in this Section.

4. Section 260513 "Medium-Voltage Cables" for single-conductor and multiconductor cables, cable splices, and terminations for electrical distribution systems with 601 to 35 000 V.

5. Section 260523 "Control-Voltage Electrical Power Cables" for control systems communications cables and Classes 1, 2, and 3 control cables.

6. Section 271313 "Communications Copper Backbone Cabling" for twisted pair cabling used for data circuits.

7. Section 271513 "Communications Copper Horizontal Cabling" for twisted pair cabling used for data circuits.

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.

B. Sustainable Design Submittals:

C. Product Schedule: Indicate type, use, location, and termination locations.

1.3 INFORMATIONAL SUBMITTALS
A. Field quality-control reports.

PART 2 - PRODUCTS

2.1 NONMETALLIC UNDERGROUND CONDUIT WITH CONDUCTORS, TYPE NUCC A. Description: A factory assembly of conductors or cables inside a nonmetallic, smooth wall raceway with a circular cross section.

Page 1449 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES
260519 - 2
B. Applicable Standards:

1. Regulatory Requirements: Listed and labeled in accordance with NFPA 70 and marked for intended location and use.

2. General Characteristics:
a. Reference Standards: UL 1990.

PART 3 - EXECUTION

3.1 CONDUCTOR MATERIAL APPLICATIONS
A. Feeders:

1. Copper; solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

2. Copper for feeders smaller than No. 4 AWG; copper or aluminum for feeders No. 4 AWG and larger. Conductors must be solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

B. Branch Circuits:

1. Copper:
a. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger. b. Solid for No. 12 AWG and smaller; stranded for No. 10 AWG and larger.

C. ASD Output Circuits Cable: Extra-flexible stranded for all sizes.

D. Power-Limited Fire Alarm and Control: Solid for No. 12 AWG and smaller.

E. PV Circuits: [Copper][Aluminum]. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

3.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS AND

WIRING METHODS
A. Service Entrance: [Type THHN/THWN-2, single conductors in raceway][Type XHHW-2, single conductors in raceway][Type USE, single conductor in raceway][Mineralinsulated, metal-sheathed cable, Type MI][Multiconductor cable, Type SE].

B. Exposed Feeders: [Type THHN/THWN-2, single conductors in raceway][Type XHHW2, single conductors in raceway][Armored cable, Type AC][Metal-clad cable, Type MC][Mineral-insulated, metal-sheathed cable, Type MI][Nonmetallic-sheathed cable, Type NM].

C. Feeders Concealed in Ceilings, Walls, Partitions, and Crawlspaces: [Type THHN/THWN-2, single conductors in raceway][Armored cable, Type AC][Metal-clad cable, Type MC][Mineral-insulated, metal-sheathed cable, Type MI][NonmetallicPage 1450 of 1878 NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES
260519 - 3
sheathed cable, Type NM].

D. Feeders Concealed in Concrete, below Slabs-on-Grade, and Underground: [Type THHN/THWN-2, single conductors in raceway][Type XHHW-2, single conductors in raceway][Underground feeder cable, Type UF].

E. Feeders Installed below Raised Flooring: [Type THHN/THWN-2, single conductors in raceway][Armored cable, Type AC][Metal-clad cable, Type MC][Mineral-insulated, metal-sheathed cable, Type MI].

F. Feeders in Cable Tray: [Type THHN/THWN-2, single conductors in raceway][Type XHHW-2, single conductors larger than No. 1/0 AWG][Armored cable, Type AC][Metalclad cable, Type MC][Mineral-insulated, metal-sheathed cable, Type MI][Nonmetallicsheathed cable, Type NM].

G. Exposed Branch Circuits, Including in Crawlspaces: [Type THHN/THWN-2, single conductors in raceway][Armored cable, Type AC][Metal-clad cable, Type MC][Mineralinsulated, metal-sheathed cable, Type MI][Nonmetallic-sheathed cable, Type NM].

H. Branch Circuits Concealed in Ceilings, Walls, and Partitions: [Type THHN/THWN-2, single conductors in raceway][Armored cable, Type AC][Metal-clad cable, Type MC][Mineral-insulated, metal-sheathed cable, Type MI][Nonmetallic-sheathed cable, Type NM].

I. Branch Circuits Concealed in Concrete, below Slabs-on-Grade, and Underground:
[Type THHN/THWN-2, single conductors in raceway][Type XHHW-2, single conductors in raceway][Underground branch-circuit cable, Type UF].

J. Branch Circuits Installed below Raised Flooring: [Type THHN/THWN-2, single conductors in raceway][Armored cable, Type AC][Metal-clad cable, Type MC][Mineralinsulated, metal-sheathed cable, Type MI].

K. Branch Circuits in Cable Tray: [Type THHN/THWN-2, single conductors in raceway][Type XHHW-2, single conductors larger than No. 1/0 AWG][Armored cable, Type AC][Metal-clad cable, Type MC][Mineral-insulated, metal-sheathed cable, Type MI][Nonmetallic-sheathed cable, Type NM].

L. Cord Drops and Portable Appliance Connections: Type SO, hard service cord with stainless steel, wire-mesh, strain relief device at terminations to suit application.

M. ASD Output Circuits: [Type XHHW-2 in metal conduit][Type TC-ER cable with braided shield][Type TC-ER cable with dual tape shield].

N. PV Circuits, Type USE-2: For PV source circuits rated at 600 V or less.

O. PV Circuits, Type PV: For PV source circuits rated at [600][1000][2000] V.

3.3 INSTALLATION, GENERAL
A. Conceal cables in finished walls, ceilings, and floors unless otherwise indicated.

Page 1451 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES
260519 - 4
B. Complete raceway installation between conductor and cable termination points in accordance with Section 260533.13 "Conduits for Electrical Systems" prior to pulling conductors and cables.

C. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.

D. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway.

E. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible.

F. Support cables according to Section 260529 "Hangers and Supports for Electrical Systems."
G. Complete cable tray systems installation according to Section 260536 "Cable Trays for Electrical Systems" prior to installing conductors and cables.

3.4 CONNECTIONS
A. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A-486B.

B. Make splices, terminations, and taps that are compatible with conductor material[ and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors].

1. Use oxide inhibitor in each splice, termination, and tap for aluminum conductors.

C. Wiring at Outlets: Install conductor at each outlet, with at least [6 inch][12 inch] of slack.

D. Comply with requirements in Section 284600 "Fire Detection and Alarm" for connecting, terminating, and identifying wires and cables.

3.5 IDENTIFICATION
A. Identify and color-code conductors and cables according to Section 260553 "Identification for Electrical Systems."
B. Identify each spare conductor at each end with identity number and location of other end of conductor, and identify as spare conductor.

3.6 SLEEVE AND SLEEVE-SEAL INSTALLATION FOR ELECTRICAL PENETRATIONS A. Install sleeves and sleeve seals at penetrations of exterior floor and wall assemblies.

Page 1452 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES
260519 - 5
Comply with requirements in Section 260544 "Sleeves and Sleeve Seals for Electrical Raceways and Cabling."

3.7 FIRESTOPPING
A. Apply firestopping to electrical penetrations of fire-rated floor and wall assemblies to restore original fire-resistance rating of assembly according to Section 078413 "Penetration Firestopping."

3.8 FIELD QUALITY CONTROL
A. Tests and Inspections:

1. After installing conductors and cables and before electrical circuitry has been energized, test service entrance and feeder conductors for compliance with requirements.

2. After installing conductors and cables and before electrical circuitry has been energized, test [service entrance and feeder conductors][and][conductors] feeding the following critical equipment and services for compliance with requirements:
a. <Insert, in separate subparagraphs, critical equipment and services to be tested>.

3. Perform each of the following visual and electrical tests:
a. Inspect exposed sections of conductor and cable for physical damage and correct connection according to the single-line diagram. b. Test bolted connections for high resistance using one of the following:
1) A low-resistance ohmmeter.
2) Calibrated torque wrench.
3) Thermographic survey.
c. Inspect compression-applied connectors for correct cable match and indentation.
d. Inspect for correct identification.
e. Inspect cable jacket and condition.
f. Insulation-resistance test on each conductor for ground and adjacent conductors. Apply a potential of 500 V(dc) for 300 V rated cable and 1000 V(dc) for 600 V rated cable for a one-minute duration.
g. Continuity test on each conductor and cable.
h. Uniform resistance of parallel conductors.

4. Initial Infrared Scanning: After Substantial Completion, but before Final Acceptance, perform an infrared scan of each splice in conductors No. 3 AWG and larger. Remove box and equipment covers so splices are accessible to portable scanner. Correct deficiencies determined during the scan.

Page 1453 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES
260519 - 6
a. Instrument: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device.
b. Record of Infrared Scanning: Prepare a certified report that identifies switches checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action.

5. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of each switch 11 months after date of Substantial Completion.

B. Cables will be considered defective if they do not pass tests and inspections.

C. Prepare test and inspection reports to record the following:

1. Procedures used.

2. Results that comply with requirements.

3. Results that do not comply with requirements, and corrective action taken to achieve compliance with requirements.

END OF SECTION 260519

Page 1454 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 1
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL

1.1 SUMMARY
A. Related Requirements:

1. Section 018116 "Facility Environmental Requirements" specifies basis-of-design environmental conditions and performance criteria that are applicable to product selection and installation of the Work on the Project.

2. Section 018123 "Facility Seismic and Wind Criteria" specifies basis-of-design seismic and wind criteria for nonstructural components on the Project.

3. Section 260010 "Supplemental Requirements for Electrical" specifies additional requirements applicable to coordinating, scheduling, and sequencing of the Work specified in this Section.

4. Section 264113 "Lightning Protection for Structures" specifies bonding of lightning protection grounding electrodes to facility grounding electrodes.

5. Section 260553 "Identification for Electrical Systems" specifies electrical equipment labels and warning signs installed by this Section.

6. Section 270528 "Pathways for Communications Systems"[ and Section 271100 "Communications Equipment Room Fittings"] specifies additional requirements for identification and grounding and bonding of communications equipment, raceways, boxes, and cable trays.

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Product Listing: Include copy of unexpired approval letter, on letterhead of qualified electrical testing agency, certifying product's compliance with specified listing criteria.
a. If listed manufacturer differs from selling manufacturer, indicate relationship between entities on submittal. Clearly indicate which entity warrants product performance and fitness for purpose.
b. Listing criteria identified in approval letter must match specified listing criteria. UL label indicating approval of equipment's enclosure is not considered approval of equipment for intended application. c. Product identification in approval letter must match product branding and model numbers in submittal. Approval letters for discontinued or superseded products are unacceptable for submitted product.

B. Shop Drawings: Prepare and submit the following:

1. Plans showing dimensioned locations of grounding features described in "Field Quality Control for Grounding and Bonding" Article, including the following:

Page 1455 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 2
a. Grounding electrode access enclosures.
b. Grounding electrodes.
c. Grounding arrangements and connections for separately derived systems. d. <Insert items>.

C. Sustainable Design Submittals:

1. Product data for sustainable design features for each type of product.

D. Field quality-control reports.

1.3 INFORMATIONAL SUBMITTALS
A. Manufacturer's published instructions.

1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data:

1. In addition to items specified in Section 260010 "Supplemental Requirements for Electrical," include the following:
a. Plans showing locations of grounding features described in "Field Quality Control for Grounding and Bonding" Article, including the following:
1) Grounding electrode access enclosures.
2) Grounding electrodes.
3) Grounding arrangements and connections for separately derived systems.
4) <Insert items>.
b. Instructions for periodic testing and inspection of grounding features at [test wells][ring electrodes][grounding connections for separately derived systems]<Insert locations> based on [NETA MTS][NFPA 70B]<Insert reference>.
1) Tests must determine if ground-resistance or impedance values remain within specified maximums, and instructions must recommend corrective action if values do not.
2) Include recommended testing intervals.

1.5 QUALIFICATIONS
A. Electrical Power Testing (EPT) Technician III: Possessing active NICET EPT Level III certification. Able to manage switching procedures, conduct tests of complex equipment, analyze test and equipment data, plan a job, and lead a team. Has experience performing NFPA 70B, IEEE, and NETA electrical tests.

Page 1456 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 3
B. Electrical Power Testing (EPT) Technician IV: Possessing active NICET EPT Level IV certification. Able to conduct tests of complex metering and relay systems, evaluate tests, test equipment, test results, and power system performance, recommend actions to maintain or improve system performance, and lead multi-team projects.

C. Electrical Power Testing and Inspecting Agency: Entities possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site electrical testing supervisors must possess active NICET EPT Technician [III][IV] certification.

1.6 SERVICE CONDITIONS FOR ELECTRICAL EQUIPMENT
A. Soil Resistivity: Grounding (earthing) Work on the Project must account for soil resistivity conditions specified in Section 018116 "Facility Environmental Requirements."
B. Electrical and ICT Equipment Grounding (Earthing): Do not exceed [25 Ω][10 Ω]<Insert resistance value> resistance to ground (earth).

1. Contact Architect for resolution if 25 Ω specified resistance to ground (earth) is not attained after complying with prescriptive requirements in Article 250 of NFPA

70. 2. Contact Architect for resolution if [10 Ω]<Insert resistance value> specified resistance to ground (earth) is not attained after second attempt to increase effectiveness of grounding (earthing) electrode.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Products or components listed and labeled in accordance with NFPA 70, by qualified electrical testing laboratory recognized by authorities having jurisdiction, and marked for intended location and application.

B. <Insert additional performance requirements for the Project>.

2.2 GROUNDING AND BONDING CONDUCTORS
A. Equipment Grounding Conductor:

1. Standard Features: 600 V, [THHN/THWN-2][or][THWN-2], [copper][or][tinnedcopper] wire or cable, green color, in accordance with Section 260519 "LowVoltage Electrical Power Conductors and Cables." B. Isolated Equipment Grounding Conductor:

Page 1457 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 4

1. Standard Features: 600 V, [THHN/THWN-2][or][THWN-2], [copper][or][tinnedcopper] wire or cable, green color with one or more yellow stripes, in accordance with Section 260519 "Low-Voltage Electrical Power Conductors and Cables."

2.3 GROUNDING AND BONDING CLAMPS
A. Description: Clamps suitable for attachment of grounding and bonding conductors to grounding electrodes, pipes, tubing, and rebar. Grounding and bonding clamps specified in this article are also suitable for use with communications applications.

2.4 GROUNDING AND BONDING BUSHINGS
A. Description: Bonding bushings connect conduit fittings, tubing fittings, threaded metal conduit, and unthreaded metal conduit to metal boxes and equipment enclosures, and have one or more bonding screws intended to provide electrical continuity between bushing and enclosure. Grounding bushings have provision for connection of bonding or grounding conductor and may or may not also have bonding screws.

2.5 INTERSYSTEM BONDING BRIDGE GROUNDING CONNECTORS
A. Description: Devices that provide means for connecting communications systems grounding and bonding conductors at service equipment or at disconnecting means for buildings or structures.

2.6 GROUNDING AND BONDING BUSBARS
A. Description: Miscellaneous grounding and bonding devices that serve as common connection for multiple grounding and bonding conductors.

2.7 SIGNAL REFERENCE GRIDS
A. Description: Means for providing low-impedance path to ground over a large area, approximating an equipotential plan, while simultaneously mitigating large current spikes from faults or lightning.

2.8 GROUNDING ELECTRODE ENCLOSURES
A. Description: Enclosures designed to protect grounding electrodes from damage while providing access for inspection and testing of the grounding system.

Page 1458 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 5
PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine facility's grounding electrode system and equipment grounding for compliance with requirements for maximum ground-resistance level and other conditions affecting performance of grounding and bonding of electrical system.

B. Inspect test results of grounding system measured at point of electrical service equipment connection.

C. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

D. Proceed with connection of electrical service equipment only after unsatisfactory conditions have been corrected.

3.2 SELECTION OF GROUNDING AND BONDING PRODUCTS
A. Grounding and Bonding Conductors:

1. Provide solid conductor for [8 AWG]<Insert wire size> and smaller, and stranded conductors for [6 AWG]<Insert wire size> and larger unless otherwise indicated.

2. Custom-Length Insulated Equipment Bonding Jumpers: 6 AWG, 19-strand, Type THHN.

3. Bonding Cable: 28 kcmil, 14 strands of 17 AWG conductor, 1/4 inch in diameter.

4. Bonding Conductor: 4 AWG or 6 AWG, stranded conductor.

5. Bonding Jumper: Copper tape, braided conductors terminated with copper ferrules; 1-5/8 inch wide and 1/16 inch thick.

6. Tinned Bonding Jumper: Tinned-copper tape, braided conductors terminated with copper ferrules; 1-5/8 inch wide and 1/16 inch thick.

7. Underground Grounding Conductors: Install bare [tinned-]copper conductor, [2/0 AWG]<Insert wire size> minimum.

B. Grounding and Bonding Connectors:

1. Pipe and Equipment Grounding Conductor Terminations: Bolted connectors.

2. Underground Connections: Welded connectors except at test wells and as otherwise indicated.

3. Connections to Ground Rods at Test Wells: Bolted connectors.

4. Connections to Structural Steel: Welded connectors.

C. Grounding and Bonding Busbars: Provide in electrical equipment rooms, in rooms housing service equipment, and elsewhere as indicated on the Drawings.

D. Substation Signal Reference Grid:

1. Unless more stringent requirements are specified in Contract Documents or manufacturers' published instructions, comply with IEEE C2.

Page 1459 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 6
a. Install [8 AWG][6 AWG]<Insert wire size from fault calculation> bonding conductors below grade in a grid pattern on 2 ft centers. Bond grid conductors with exothermic welds where they cross each other. b. Grid must fill entire area inside equipment yard fence, and extend minimum

6.5 ft outside fence, so someone walking or running outside yard may not touch fence or open gate without first stepping inside grid. c. Bond each metal fence post and gate post to at least two grid conductors. d. Inside grid, bond equipment reinforcing steel inside bases and sidewalks to at least two grid conductors.
e. Bond underground metal pipe and conduit passing under grid to nearest grid conductor at both ends.

E. Signal Reference Grid Tape Mesh:

1. Install tape mesh under floor finish with the following features:
a. Tape mesh, 2 inch by 16 mil solid copper, [12 inch][24 inch] spacing.

3.3 SELECTION OF GROUNDING AND BONDING PRODUCTS FOR

COMMUNICATIONS
A. Comply with Section 270528 "Pathways for Communications Systems" and Section 271100 "Communications Equipment Room Fittings."

3.4 SELECTION OF GROUNDING AND BONDING PRODUCTS FOR TOWERS AND

ANTENNAS
A. Special Techniques:

1. Ring Electrode: Buried at least 30 inch below grade and at least 24 inch from base of tower or mounting.

2. Bond each tower base and metallic frame of dish to ring electrode, buried at least 18 inch below grade.

3. Bond ring electrode and antenna bonding conductors to equipment room PBB or SBB, buried at least 30 inch below grade.

4. Bond metal fences located within 6 ft of towers and antennas to ring electrode, buried at least 18 inch below grade.

5. Special Requirements for Roof-Mounted Towers:
a. Roof Ring: Meet requirements for ring electrode except conductors must comply with NFPA 780.
b. Bond tower base footings steel, SBB in equipment room, and antenna support guys to roof ring.
c. Connect roof ring to perimeter conductors of lightning protection system.

6. Special Requirements for Waveguides and Coaxial Cable:
a. Bond cable shields at point of entry into building to nearest SBB and to cable entrance plate, using 2 AWG bonding conductors.

Page 1460 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 7
b. Bond coaxial cable surge arrester to ring electrode or roof ring using bonding conductor size recommended by surge-arrester manufacturer.

3.5 INSTALLATION OF GROUNDING AND BONDING
A. Comply with manufacturer's published instructions.

B. Reference Standards:

1. Electrical Construction: ICC IBC, ICC IFC, NFPA 1, NFPA 70, and NECA NEIS

1. 2. Electrical Maintenance: NFPA 70B.

3. Electrical Safety: NFPA 70E.

4. Grounding and Bonding: NECA NEIS 331 and Article 250 of NFPA 70.

5. Communications Work: BICSI N1.

6. Work in ITE Rooms: NFPA 75.

7. Work in Health Care Facilities: NFPA 99 and Article 517 of NFPA 70.

8. Emergency and Standby Power Work: NFPA 110, NFPA 111, and NECA NEIS 416.

9. Work in Confined Spaces: NFPA 350.

10. Work in Basements and Other Developed Subterranean Spaces: NFPA 520.

11. Ground Bonding Common with Lightning Protection System: Comply with NFPA 780 and UL 96 when interconnecting with lightning protection system. Bond electrical power system ground directly to lightning protection system grounding conductor at closest point to electrical service grounding electrode. Use bonding conductor sized same as system grounding electrode conductor, and install in conduit.

12. Consult Architect for resolution of conflicting requirements.

C. Special Techniques:

1. Grounding and Bonding Conductors:
a. Route along shortest and straightest paths possible unless otherwise indicated or required by Code. Avoid obstructing access or placing conductors where they may be subjected to strain, impact, or damage. b. Underground Grounding Conductors:
1) Bury at least 30 inch below grade.
2) Duct-Bank Grounding Conductor: Bury 12 inch above duct bank when indicated as part of duct-bank installation.

2. Grounding and Bonding Connectors: Make connections so possibility of galvanic action or electrolysis is minimized. Select connectors, connection hardware, conductors, and connection methods so metals in direct contact are galvanically compatible.
a. Use electroplated or hot-tin-coated materials to ensure high conductivity and to make contact points closer in order of galvanic series. b. Make connections with clean, bare metal at points of contact.

Page 1461 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 8
c. Make aluminum-to-steel connections with stainless steel separators and mechanical clamps.
d. Make aluminum-to-galvanized-steel connections with tin-plated copper jumpers and mechanical clamps.
e. Coat and seal connections having dissimilar metals with inert material to prevent future penetration of moisture to contact surfaces. f. Bonding Straps and Jumpers: Install in locations accessible for inspection and maintenance except where routed through short lengths of conduit. 1) Bonding to Structure: Bond straps directly to basic structure, taking care not to penetrate adjacent parts.
2) Bonding to Equipment Mounted on Vibration Isolation Hangers and Supports: Install bonding so vibration is not transmitted to rigidly mounted equipment.
3) Use exothermic-welded connectors for outdoor locations; if disconnect-type connection is required, use bolted clamp. g. Grounding and Bonding for Piping:
1) Metal Water Service Pipe: Install insulated copper grounding conductors, in conduit, from building's main service equipment, or grounding bus, to main metal water service entrances to building.

Connect grounding conductors to main metal water service pipes; use bolted clamp connector or bolt lug-type connector to pipe flange by using one of lug bolts of flange. Where dielectric main water fitting is installed, connect grounding conductor on street side of fitting.

Bond metal grounding conductor conduit or sleeve to conductor at each end.
2) Water Meter Piping: Use braided-type bonding jumpers to electrically bypass water meters. Connect to pipe with bolted connector. 3) Bond each aboveground portion of gas piping system downstream from equipment shutoff valve.
h. Bonding Interior Metal Ducts: Bond metal air ducts to equipment grounding conductors of associated fans, blowers, electric heaters, and air cleaners.

Install [tinned]bonding jumper to bond across flexible duct connections to achieve continuity.
i. Grounding for Steel Building Structure: Install driven ground rod at base of each corner column and at intermediate exterior columns at distances not more than 60 ft apart.

3. Grounding and Bonding Busbars:
a. Install busbar horizontally, on insulated spacers 2 inch minimum from wall, 6 inch above finished floor unless otherwise indicated. b. Where busbars are indicated on both sides of doorways, route bonding conductor up to top of door frame, across top of doorway, and down; connect to continuation of horizontal busbar.

4. Electrodes:

Page 1462 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 9
a. Ground Rods: Drive rods until tops are 2 inch below finished floor or final grade unless otherwise indicated.
1) Interconnect ground rods with grounding electrode conductor below grade and as otherwise indicated. Make connections without exposing steel or damaging coating if any.
2) Use exothermic welds for below-grade connections.
b. For grounding electrode system, install at least [three]<Insert number> rods spaced at least one-rod length from each other and located at least same distance from other grounding electrodes, and connect to service grounding electrode conductor.
c. Test Wells: Ground rod driven through drilled hole in bottom of handhole.

Handholes are specified in Section 260543 "Underground Ducts and Raceways for Electrical Systems," and must be at least 12 inch deep, with cover.
1) Install at least one test well for each service unless otherwise indicated. Install at ground rod electrically closest to service entrance.

Set top of test well flush with finished grade or floor. d. Ring Electrode: Install grounding conductor, electrically connected to each building structure ground rod and to each [steel column][indicated item], extending around perimeter of [building][area or item indicated]. 1) Install tinned-copper conductor not less than [2/0 AWG]<Insert wire size> for ring electrode and for taps to building steel. 2) Bury ring electrode not less than [24 inch]<Insert dimension> from building's foundation.
e. Concrete-Encased Electrode (Ufer Ground):
1) Fabricate in accordance with NFPA 70; use minimum of [20 ft]<Insert dimension> of bare copper conductor not smaller than [4 AWG]<Insert wire size>.
a) If concrete foundation is less than [20 ft]<Insert dimension> long, coil excess conductor within base of foundation.
b) Bond grounding conductor to reinforcing steel in at least four locations and to anchor bolts. Extend grounding conductor below grade and connect to building's grounding grid or to grounding electrode external to concrete.
2) Fabricate in accordance with NFPA 70; using electrically conductive coated steel reinforcing bars or rods, at least 20 ft long. If reinforcing is in multiple pieces, connect together by usual steel tie wires or exothermic welding to create required length.

5. Grounding at Service:
a. Equipment grounding conductors and grounding electrode conductors must

Page 1463 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 10
be connected to ground busbar. Install main bonding jumper between neutral and ground buses.

6. Grounding Separately Derived Systems:
a. Permanent Generators: Install grounding electrode(s) at location of permanent generators having switched neutral connections. Electrode must be connected to equipment grounding conductor and to frame of generator.

7. Grounding Underground Distribution System Components:
a. Duct-Bank Grounding Conductor: Bury 12 inch above duct bank when indicated as part of duct-bank installation.
b. Comply with IEEE C2 grounding requirements.
c. Grounding Manholes and Handholes: Install driven ground rod through manhole or handhole floor, close to wall, and set rod depth so 4 inch will extend above finished floor. If necessary, install ground rod before manhole is placed and provide 1/0 AWG bare, tinned-copper conductor from ground rod into manhole through waterproof sleeve in manhole wall. Protect ground rods passing through concrete floor with double wrapping of pressure-sensitive insulating tape or heat-shrunk insulating sleeve from 2 inch above to 6 inch below concrete. Seal floor opening with waterproof, nonshrink grout.
d. Grounding Connections to Manhole Components: Bond exposed-metal parts such as inserts, cable racks, pulling irons, ladders, and cable shields within each manhole or handhole, to ground rod or grounding conductor.

Make connections with 4 AWG minimum, stranded, hard-drawn copper bonding conductor. Train conductors level or plumb around corners and fasten to manhole walls. Connect to cable armor and cable shields in accordance with manufacturer's published instructions with splicing and termination kits.
e. Pad-Mounted Transformers and Switches: Install two ground rods and ring electrode around pad. Ground pad-mounted equipment and noncurrentcarrying metal items associated with substations by connecting them to underground cable and grounding electrodes. Install tinned-copper conductor not less than 2 AWG for ring electrode and for taps to equipment grounding terminals. Bury ring electrode not less than 6 inch from foundation.

8. Equipment Grounding and Bonding:
a. Install insulated equipment grounding conductors with feeders and branch circuits.
b. Install insulated equipment grounding conductors with the following items, in addition to those required by NFPA 70:
1) Feeders and branch circuits.
2) Lighting circuits.
3) Receptacle circuits.

Page 1464 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 11
4) Single-phase motor and appliance branch circuits.
5) Three-phase motor and appliance branch circuits.
6) Flexible raceway runs.
7) Armored and metal-clad cable runs.
8) Busway Supply Circuits: Install insulated equipment grounding conductor from grounding bus in switchgear, switchboard, or distribution panel to equipment grounding bar terminal on busway. 9) X-Ray Equipment Circuits: Install insulated equipment grounding conductor in circuits supplying x-ray equipment.
c. Air-Duct Equipment Circuits: Install insulated equipment grounding conductor to duct-mounted electrical devices operating at 120 V and more, including air cleaners, heaters, dampers, humidifiers, and other duct electrical equipment. Bond conductor to each unit and to air duct and connected metallic piping.
d. Water Heater, Heat-Tracing, and Antifrost Heating Cables: Install separate insulated equipment grounding conductor to each electric water heater and heat-tracing cable. Bond conductor to heater units, piping, connected equipment, and components.
e. Isolated Grounding Receptacle Circuits: Install insulated equipment grounding conductor connected to receptacle grounding terminal. Isolate conductor from raceway and from panelboard grounding terminals.

Terminate at equipment grounding conductor terminal of applicable derived system or service unless otherwise indicated.
f. Isolated Equipment Enclosure Circuits: For designated equipment supplied by branch circuit or feeder, isolate equipment enclosure from supply circuit raceway with nonmetallic raceway fitting listed for the purpose. Install fitting where raceway enters enclosure, and install separate insulated equipment grounding conductor. Isolate conductor from raceway and from panelboard grounding terminals. Terminate at equipment grounding conductor terminal of applicable derived system or service unless otherwise indicated. g. Poles Supporting Outdoor Lighting Fixtures: Bond insulated equipment grounding conductor to equipment grounding terminal inside pole base. h. Metallic Fences: Comply with requirements of IEEE C2. 1) Grounding Conductor: Bare[, tinned] copper, not less than [8 AWG]<Insert wire size>.
2) Gates: Must be bonded to grounding conductor with flexible bonding jumper.
3) Barbed Wire: Strands must be bonded to grounding conductor.

9. Fence Grounding:
a. Grounding Method: At each grounding location, drive grounding rod vertically until top is 6 inch below finished grade. Connect rod to fence with 6 AWG conductor. Connect conductor to each fence component at grounding location.
b. Fences greater than 100 ft of Buildings, Structures, Walkways, and Roadways: Ground fence at maximum intervals of [1500 ft]<Insert lesser distance if grounding resistance is high>.

Page 1465 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 12
c. Fences within 100 ft of Buildings, Structures, Walkways, and Roadways:

Ground fence at maximum intervals of [750 ft]<Insert lesser distance if grounding resistance is high>.
1) Gates and Other Fence Openings: Ground fence on each side of opening.
a) Bond metal gates to gate posts by connecting bonding jumper between gate post and gate frame.
b) Bond across openings, with and without gates, except at openings indicated as intentional fence discontinuities. Use 2 AWG wire and bury it at least 18 inch below finished grade. d. Protection at Crossings of Overhead Electrical Power Lines: Ground fence at location of power line crossing and at maximum distance of 150 ft on each side of crossing.
e. Bonding to Lightning-Protection System: If fence terminates at lightningprotected building or structure, ground fence and bond fence grounding conductor to lightning-protection down conductor or lightning-protection grounding conductor, complying with NFPA 780.

3.6 FIELD QUALITY CONTROL FOR GROUNDING AND BONDING
A. Administrant for Electrical Power Tests and Inspections:

1. [Owner][Tenant] will engage qualified electrical testing and inspecting agency to administer and perform tests and inspections.

2. Engage qualified electrical testing and inspecting agency to administer and perform tests and inspections.

3. Engage factory-authorized service representative to administer and perform tests and inspections on components, assemblies, and equipment installations, including connections.

4. Administer and perform tests and inspections[ with assistance of factoryauthorized service representative].

B. Acceptance Testing Preparation:

1. <Insert requirements>.

C. Field tests and inspections must be witnessed by [Architect][Tenant][authorities having jurisdiction]<Insert names or titles of witnesses>.

D. Tests and Inspections:

1. After installing grounding system but before permanent electrical circuits have been energized, test for compliance with requirements.

2. Inspect physical and mechanical condition. Verify tightness of accessible, bolted, electrical connections with calibrated torque wrench in accordance with manufacturer's published instructions.

3. Test completed grounding system at each location where maximum groundPage 1466 of 1878 NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS
260526 - 13
resistance level is specified, at service disconnect enclosure grounding terminal[, at ground test wells][, and at individual ground rods]. Make tests at ground rods before conductors are connected.
a. Measure ground resistance no fewer than two full days after last trace of precipitation and without soil being moistened by means other than natural drainage or seepage and without chemical treatment or other artificial means of reducing natural ground resistance.
b. Perform tests by fall-of-potential method in accordance with IEEE Std 81. c. Excessive Ground Resistance: If resistance to ground exceeds specified values, notify Architect promptly and include recommendations to reduce ground resistance.

4. Prepare dimensioned Drawings locating each test well, ground rod and groundrod assembly, and other grounding electrodes. Identify each by letter in alphabetical order, and key to record of tests and observations. Include number of rods driven and their depth at each location, and include observations of weather and other phenomena that may affect test results. Describe measures taken to improve test results.

E. Nonconforming Work:

1. Grounding system will be considered defective if it does not pass tests and inspections.

2. Remove and replace defective components and retest.

F. Collect, assemble, and submit test and inspection reports.

1. Report measured ground resistances that exceed the following values:
a. Power and Lighting Equipment or System with Capacity of 500 kVA and Less: [10 Ω]<Insert ohms>.
b. Power and Lighting Equipment or System with Capacity of 500 to 1000 kVA: [5 Ω]<Insert ohms>.
c. Power and Lighting Equipment or System with Capacity More Than 1000 kVA: [3 Ω]<Insert ohms>.
d. Power Distribution Units or Panelboards Serving Electronic Equipment: [1 Ω][3 Ω]<Insert ohms>.
e. Substations and Pad-Mounted Equipment: [5 Ω]<Insert ohms>. f. Manhole Grounds: [10 Ω]<Insert ohms>.
g. <Insert application and maximum ground-resistance>.

3.7 PROTECTION
A. After installation, protect grounding and bonding cables and equipment from construction activities. Remove and replace items that are contaminated, defaced, damaged, or otherwise caused to be unfit for use prior to acceptance by Owner.

END OF SECTION 260526

Page 1467 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 1
SECTION 260533.13 - CONDUITS FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL

1.1 SUMMARY
A. Related Requirements:

1. Section 018116 "Facility Environmental Requirements" specifies temperature, humidity, acoustical, and other field conditions applicable to the Work specified in this Section.

2. Section 018123 "Facility Seismic and Wind Criteria" specifies seismic hazard, wind hazard, other structural load design conditions applicable to the Work specified in this Section.

3. Section 260010 "Supplemental Requirements for Electrical" specifies additional coordination, scheduling, sequencing, submittal, and installation requirements applicable to the Work for electrical, communications, and electronic safety and security systems on the Project, including wiring methods.

4. Section 078413 "Penetration Firestopping" specifies firestopping referenced by this Section.

5. Section 260519 "Low-Voltage for Electrical Power Conductors and Cables" specifies nonmetallic underground conduit with conductors (Type NUCC).

6. Section 260529 "Hangers and Supports for Electrical Systems" specifies conduit hangers and supports referenced by this Section.

7. Section 260543 "Underground Ducts and Raceways for Electrical Systems" specifies exterior duct banks, manholes, and underground utility construction.

8. Section 260553 "Identification for Electrical Systems" specifies electrical equipment labels.

9. Section 270528 "Pathways for Communications Systems"[ and Section 271100 "Communications Equipment Room Fittings"] specifies additional requirements for installation of conduits for communications cabling.

1.2 REFERENCES
A. Abbreviations and Acronyms for Electrical Raceway Types:

1. EMT: Electrical metallic tubing.

2. EMT-A: Aluminum electrical metallic tubing.

3. EMT-S: Steel electrical metallic tubing.

4. EMT-SS: Stainless steel electrical metallic tubing.

5. ENT: Electrical nonmetallic tubing.

6. EPEC: Electrical HDPE underground conduit (thin wall).

7. EPEC-A: Type A electrical HDPE underground conduit.

8. EPEC-B: Type B electrical HDPE underground conduit.

9. ERMC: Electrical rigid metal conduit.

10. ERMC-A: Aluminum electrical rigid metal conduit.

11. ERMC-S: Steel electrical rigid metal conduit.

Page 1468 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 2

12. ERMC-S-G: Galvanized-steel electrical rigid metal conduit.

13. ERMC-S-PVC: PVC-coated-steel electrical rigid metal conduit.

14. ERMC-SS: Stainless steel electrical rigid metal conduit.

15. FMC: Flexible metal conduit.

16. FMC-A: Aluminum flexible metal conduit.

17. FMC-S: Steel flexible metal conduit.

18. FMT: Steel flexible metallic tubing.

19. FNMC: Flexible nonmetallic conduit. See "LFNC."

20. HDPE: HDPE underground conduit (thick wall).

21. HDPE-40: Schedule 40 HDPE underground conduit.

22. HDPE-80: Schedule 80 HDPE underground conduit.

23. IMC: Steel electrical intermediate metal conduit.

24. LFMC: Liquidtight flexible metal conduit.

25. LFMC-A: Aluminum liquidtight flexible metal conduit.

26. LFMC-S: Steel liquidtight flexible metal conduit.

27. LFMC-SS: Stainless steel liquidtight flexible metal conduit.

28. LFNC: Liquidtight flexible nonmetallic conduit.

29. LFNC-A: Layered (Type A) liquidtight flexible nonmetallic conduit.

30. LFNC-B: Integral (Type B) liquidtight flexible nonmetallic conduit.

31. LFNC-C: Corrugated (Type C) liquidtight flexible nonmetallic conduit.

32. PVC: Rigid PVC conduit.

33. PVC-40: Schedule 40 rigid PVC conduit.

34. PVC-80: Schedule 80 rigid PVC Conduit.

35. PVC-A: Type A rigid PVC concrete-encased conduit.

36. PVC-EB: Type EB rigid PVC concrete-encased underground conduit.

37. RGS: See ERMC-S-G.

38. RMC: See ERMC.

39. RTRC: Reinforced thermosetting resin conduit.

40. RTRC-AG: Low-halogen, aboveground reinforced thermosetting resin conduit.

41. RTRC-AG-HW: Heavy wall, low-halogen, aboveground reinforced thermosetting resin conduit.

42. RTRC-AG-SW: Standard wall, low-halogen, aboveground reinforced thermosetting resin conduit.

43. RTRC-AG-XW: Extra heavy wall, low-halogen, aboveground reinforced thermosetting resin conduit.

44. RTRC-BG: Low-halogen, belowground reinforced thermosetting resin conduit.

B. Definitions:

1. Conduit: A structure containing one or more duct raceways.

2. Direct Buried: Installed underground without encasement in concrete or other protective material.

3. Duct Bank: An arrangement of conduit providing one or more continuous duct raceways between two points.

4. Duct Raceway: A single enclosed raceway for conductors or cable.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.

Page 1469 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 3
B. Sustainable Design Submittals:

1. Product data for sustainable design features for each type of product.

C. Field quality-control reports.

1.4 INFORMATIONAL SUBMITTALS
A. Manufacturer's published instructions.

1.5 QUALIFICATIONS
A. Electrical Power Testing (EPT) Technician III: Possessing active NICET EPT Level III certification. Able to manage switching procedures; conduct tests of complex equipment; analyze test and equipment data; plan a job; and lead a team. Has experience performing NFPA 70B, IEEE, and NETA electrical tests.

B. Electrical Power Testing (EPT) Technician IV: Possessing active NICET EPT Level IV certification. Able to conduct tests of complex metering and relay systems; evaluate tests, test equipment, test results, and power system performance; recommend actions to maintain or improve system performance; and lead multi-team projects.

C. Electrical Power Testing and Inspecting Agency: Entities possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site electrical testing supervisors must possess active NICET EPT Technician [III][IV] certification.

D. ERMC-S-PVC Installers: Installer possessing active qualifications specified in Section 014000 "Quality Requirements," and able to present unexpired certified Installer credentials issued by ERMC-S-PVC manufacturer prior to starting installation.

E. Communications Testing and Inspecting Agency: Entity possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site communications testing supervisor must have [BICSI Technician (TECH)]<Insert certification program> certification and documented training, and be experienced with testing communications equipment in accordance with [BICSI]<Insert code enforced by authorities having jurisdiction> testing standards.

Page 1470 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 4
PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Products or components listed and labeled in accordance with NFPA 70, by qualified electrical testing laboratory recognized by authorities having jurisdiction, and marked for intended location and application.

B. <Insert additional performance requirements for the Project>.

PART 3 - EXECUTION

3.1 SELECTION OF CONDUITS FOR ELECTRICAL SYSTEMS
A. Unless more stringent requirements are specified in the Contract Documents or manufacturer's published instructions, comply with NFPA 70 for selection of duct raceways. Consult Architect for resolution of conflicting requirements.

B. Special Instructions Regarding HDPE Conduits: Although Article 353 of NFPA 70 permits use of HDPE conduits where encased in concrete aboveground, UL CCN EAZX listing requirements state that HDPE[ and EPEC] underground conduits are intended only for use where direct buried with or without being encased in concrete.

Specified Type HDPE[ and Type EPEC] underground conduits are not permitted to be used aboveground on the Project.

C. Outdoors:

1. Exposed and Subject to Severe Physical Damage: [ERMC][IMC].

2. Exposed and Subject to Physical Damage: [ERMC][IMC][Corrosion-resistant EMT].

3. Exposed and Not Subject to Physical Damage: [ERMC][IMC][Corrosion-resistant EMT][PVC-80][RTRC-AG].

4. Concealed Aboveground: [ERMC][IMC][EMT][PVC-80][PVC-40][RTRC-AG].

5. Direct Buried: [PVC-80][PVC-40][HDPE-80][HDPE-40][RTRC-BG].

6. Concrete Encased Not in Trench: [PVC-80][PVC-40][PVC-A][RTRC-BG].

7. Concrete Encased in Trench: [PVC-80][PVC-40][PVC-A][PVC-EB][HDPE80][HDPE-40][EPEC-A][EPEC-B][RTRC-BG].

8. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid, or Motor-Driven Equipment): [LFMC][LFNCA][LFNC-B].

D. Indoors:

1. Hazardous Classified Locations: [ERMC][IMC].

2. Exposed and Subject to Severe Physical Damage: [ERMC][IMC].

3. Exposed and Subject to Physical Damage: [ERMC][IMC][EMT].

4. Exposed and Not Subject to Physical Damage: [ERMC][IMC][EMT][PVC80][RTRC-AG].

Page 1471 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 5

5. Concealed in Ceilings and Interior Walls and Partitions: [ERMC][IMC][EMT][PVC80][PVC-40][RTRC-AG].

6. Damp or Wet Locations: [ERMC][IMC][RTRC-AG][Corrosion-resistant EMT].

7. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid, or Motor-Driven Equipment): [LFMC][FMC][LFNCA][LFNC-B].

8. Circuits Operating Above 60 Hz: [EMT-A][ERMC-A][RTRC-AG]. Provide nonmetallic sleeve where aluminum duct raceways pass through concrete.

E. Duct Fittings: Select fittings in accordance with NEMA FB 2.10 guidelines.

1. ERMC and IMC: Provide threaded-type fittings unless otherwise indicated.

3.2 INSTALLATION OF CONDUITS FOR ELECTRICAL SYSTEMS
A. Comply with manufacturer's published instructions.

B. Reference Standards for Installation: Unless more stringent installation requirements are specified in the Contract Documents or manufacturer's published instructions, comply with the following:

1. Electrical Construction: ICC IBC, ICC IFC, NFPA 1, NFPA 70, and NECA NEIS

1. 2. Electrical Safety: NFPA 70E.

3. Commissioning of Active and Passive Fire Protection Features: NFPA 3 and NFPA 4.

4. Grounding and Bonding: NECA NEIS 331 and Article 250 of NFPA 70.

5. Communications Work: BICSI N1.

6. Life Safety and Means of Egress Work: NFPA 101.

7. Emergency and Standby Power Work: NFPA 110, NFPA 111, and NECA NEIS 416.

8. Work in Confined Spaces: NFPA 350.

9. Work in Basements and Other Developed Subterranean Spaces: NFPA 520.

10. Type EMT-A: Article 358 of NFPA 70 and NECA NEIS 102.

11. Type EMT-SS: Article 358 of NFPA 70 and NECA NEIS 101.

12. Type EMT-S: Article 358 of NFPA 70 and NECA NEIS 101.

13. Type ENT: Article 362 of NFPA 70 and NECA NEIS 102.

14. Type HDPE and Type EPEC: Article 353 of NFPA 70 and NECA NEIS 111.

15. Type ERMC-A: Article 344 of NFPA 70 and NECA NEIS 102.

16. Type ERMC-SS: Article 344 of NFPA 70 and NECA NEIS 101.

17. Type ERMC-S: Article 344 of NFPA 70 and NECA NEIS 101.

18. Type FMC-S: Article 348 of NFPA 70 and NECA NEIS 101.

19. Type FMC-A: Article 348 of NFPA 70 and NECA NEIS 102.

20. Type FMT: Article 360 of NFPA 70 and NECA NEIS 101.

21. Type IMC: Article 342 of NFPA 70 and NECA NEIS 101.

22. Type LFMC: Article 350 of NFPA 70 and NECA NEIS 101.

23. Type LFNC: Article 342 of NFPA 70 and NECA NEIS 111.

24. Type PVC: Article 356 of NFPA 70 and NECA NEIS 111.

25. Type RTRC: Article 355 of NFPA 70 and NECA NEIS 111.

Page 1472 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 6

26. Expansion Fittings: NEMA FB 2.40.

27. Consult Architect for resolution of conflicting requirements.

C. Special Installation Techniques:

1. General Requirements for Installation of Duct Raceways:
a. Complete duct raceway installation before starting conductor installation. b. Provide stub-ups through floors with coupling threaded inside for plugs, set flush with finished floor. Plug coupling until conduit is extended above floor to final destination or a minimum of 2 ft above finished floor. c. Install no more than equivalent of three 90-degree bends in conduit run[ except for control wiring conduits, for which no more than equivalent of two 90-degree fewer bends are permitted]. Support within 12 inch of changes in direction.
d. Make bends in duct raceway using large-radius preformed ells except for parallel bends. Field bending must be in accordance with NFPA 70 minimum radii requirements. Provide only equipment specifically designed for material and size involved.
e. Conceal conduit within finished walls, ceilings, and floors unless otherwise indicated. Install conduits parallel or perpendicular to building lines. f. Support conduit within 12 inch of enclosures to which attached. g. Install duct sealing fittings at accessible locations in accordance with NFPA 70 and fill them with listed sealing compound. For concealed duct raceways, install fitting in flush steel box with blank cover plate having finish similar to that of adjacent plates or surfaces. Install duct sealing fittings in accordance with NFPA 70.
h. Install devices to seal duct raceway interiors at accessible locations. Locate seals so no fittings or boxes are between the seal and the following changes of environments. Seal interior of duct raceways at the following points:
1) Where conduits pass from warm to cold locations, such as boundaries of refrigerated spaces.
2) Where an underground service duct raceway enters a building or structure.
3) Conduit extending from interior to exterior of building. 4) Conduit extending into pressurized duct raceway and equipment. 5) Conduit extending into pressurized zones that are automatically controlled to maintain different pressure set points.
6) Where otherwise required by NFPA 70.
i. Do not install duct raceways or electrical items on "explosion-relief" walls or rotating equipment.
j. Do not install conduits within 2 inch of the bottom side of a metal deck roof. k. Keep duct raceways at least 6 inch away from parallel runs of flues and steam or hot-water pipes. Install horizontal duct raceway runs above water and steam piping.
l. Cut conduit perpendicular to the length. For conduits metric designator 53 (trade size 2) and larger, use roll cutter or a guide to make cut straight and

Page 1473 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 7
perpendicular to the length. Ream inside of conduit to remove burrs. m. Install pull wires in empty duct raceways. Provide polypropylene or monofilament plastic line with not less than 200 lb tensile strength. Leave at least 12 inch of slack at both ends of pull wire. Cap underground duct raceways designated as spare above grade alongside duct raceways in use.
n. Install duct raceways square to the enclosure and terminate at enclosures without hubs with locknuts on both sides of enclosure wall. Install locknuts hand tight, plus one-quarter turn more.
1) Termination fittings with shoulders do not require two locknuts. o. Terminate threaded conduits into threaded hubs or with locknuts on inside and outside of boxes or cabinets. Install bushings on conduits up to metric designator 35 (trade size 1-1/4) and insulated throat metal bushings on metric designator 41 (trade size 1-1/2) and larger conduits terminated with locknuts.[ Install insulated throat metal grounding bushings on service conduits].

2. Types EMT-A, ERMC-A, and FMC-A: Do not install aluminum duct raceways or fittings in contact with concrete or earth.

3. Types ERMC and IMC:
a. Threaded Conduit Joints, Exposed to Wet, Damp, Corrosive, or Outdoor Conditions: Apply listed compound that maintains electrical conductivity to threads of duct raceway and fittings before making up joints. Follow compound manufacturer's published instructions.

4. Type ERMC-S-PVC:
a. Follow manufacturer's installation instructions for clamping, cutting, threading, bending, and assembly.
b. Provide PVC-coated sealing locknut for exposed male threads transitioning into female NPT threads that do not have sealing sleeves, including transitions from PVC couplings/female adapters to Type ERMC-S-PVC elbows in direct-burial applications. PVC-coated sealing locknuts must not be used in place of conduit hub. PVC-coated sealing locknut must cover exposed threads on Type ERMC-S-PVC duct raceway.
c. Coat field-cut threads on PVC-coated duct raceway with manufacturerapproved corrosion-preventing conductive compound prior to assembly.

5. Types FMC, LFMC, and LFNC:
a. Provide a maximum of [36 inch][72 inch] of flexible conduit for [recessed and semirecessed luminaires,]equipment subject to vibration, noise transmission, or movement; and for transformers and motors.

6. Types PVC, HDPE, and EPEC:
a. Do not install Type PVC, Type HDPE, or Type EPEC conduit where ambient temperature exceeds [122 deg F]<Insert temperature>. Conductor

Page 1474 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 8
ratings must be limited to 75 deg C except where installed in a trench outside buildings with concrete encasement, where 90 deg C conductors are permitted.
b. Comply with manufacturer's published instructions for solvent welding and fittings.
c. Join joints with solvent cement in accordance with manufacturer's published instructions and allowed to cure before handling. Joints to be bent, pushed, or pulled must set for minimum 24 h after joining.

7. Type RTRC: Do not install Type RTRC conduit where ambient temperature exceeds [230 deg F]<Insert temperature>.

8. Duct Raceways Embedded in Slabs:
a. [Run duct raceways larger than metric designator 27 (trade size 1) below concrete slab][Run duct raceways larger than metric designator 27 (trade size ) parallel or at right angles to main reinforcement. Where at right angles to reinforcement, place duct raceway close to slab support. Secure duct raceways to reinforcement at maximum 10 ft intervals]. b. Arrange duct raceways to cross building expansion joints with expansion fittings at right angles to the joint.
c. Arrange duct raceways to ensure that each is surrounded by minimum of [1 inch][2 inch]<Insert dimension> of concrete without voids. d. Do not embed threadless fittings in concrete unless locations have been specifically approved by Architect.
e. Change from ENT to [PVC-80][PVC-40][ERMC][or][IMC] before rising above floor.

9. Stub-ups to Above Recessed Ceilings:
a. Provide EMT, IMC, or ERMC for duct raceways.
b. Provide a conduit bushing or insulated fitting to terminate stub-ups not terminated in hubs or in an enclosure.

10. Duct Raceway Terminations at Locations Subject to Moisture or Vibration:
a. Provide insulating bushings to protect conductors, including conductors smaller than 4 AWG.[ Install insulated throat metal grounding bushings on service conduits].

11. Duct Fittings: Install fittings in accordance with NEMA FB 2.10 guidelines. a. ERMC-S-PVC: Provide only fittings listed for use with this type of conduit.

Patch and seal joints, nicks, and scrapes in PVC coating after installing conduits and fittings. Provide sealant recommended by fitting manufacturer and apply in thickness and number of coats recommended by manufacturer.
b. EMT: Provide [setscrew][compression], [steel][cast-metal] fittings. Comply with NEMA FB 2.10.
c. Flexible Conduit: Provide only fittings listed for use with flexible conduit type. Comply with NEMA FB 2.20.

Page 1475 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 9

12. Expansion-Joint Fittings:
a. Install in runs of aboveground PVC that are located where environmental temperature change may exceed 30 deg F and that have straight-run length that exceeds 25 ft. Install in runs of aboveground ERMC[ and EMT] conduit that are located where environmental temperature change may exceed 100 deg F and that have straight-run length that exceeds 100 ft. b. Install type and quantity of fittings that accommodate temperature change listed for the following locations:
1) Outdoor Locations Not Exposed to Direct Sunlight:
[125 deg F]<Insert temperature> temperature change.
2) Outdoor Locations Exposed to Direct Sunlight: [155 deg F]<Insert temperature> temperature change.
3) Indoor Spaces Connected with Outdoors without Physical Separation: [125 deg F]<Insert temperature> temperature change. 4) Attics: [135 deg F]<Insert temperature> temperature change. 5) <Insert location and corresponding temperature change>. c. Install fitting(s) that provide expansion and contraction for at least

0.00041 inch per foot of length of straight run per deg F of temperature change for PVC conduits. Install fitting(s) that provide expansion and contraction for at least 0.000078 inch per foot of length of straight run per deg F of temperature change for metal conduits.
d. Install expansion fittings at locations where conduits cross building or structure expansion joints.
e. Install expansion-joint fitting with position, mounting, and piston setting selected in accordance with manufacturer's published instructions for conditions at specific location at time of installation. Install conduit supports to allow for expansion movement.

13. Duct Raceways Penetrating Rooms or Walls with Acoustical Requirements: Seal duct raceway openings on both sides of rooms or walls with acoustically rated putty[ or firestopping].

14. Identification: Provide labels for conduit assemblies, duct raceways, and associated electrical equipment.
a. Provide warning signs.

15. <Insert more stringent installation requirements that supplement or supersede listed standards and manufacturer's published instructions>.

D. Interfaces with Other Work:

1. Firestop penetrations of fire-rated floor and wall assemblies.

2. Provide conduit hangers and supports.

3. Coordinate installation of new products for <Insert system or product family/category> with existing conditions.
a. <Insert requirements for transition between new and existing>.

Page 1476 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 10

4. Coordinate with <Insert Section number and title> for <Insert description of interfacing related Work>.
a. <Insert requirements for transition between this Section and related Work>.

3.3 FIELD QUALITY CONTROL OF CONDUITS FOR ELECTRICAL SYSTEMS A. Administrant for Electrical Power Tests and Inspections:

1. [Owner][Tenant] will engage qualified medium-voltage electrical testing and inspecting agency to administer and perform tests and inspections.

2. Engage qualified medium-voltage electrical testing and inspecting agency to administer and perform tests and inspections.

3. Engage factory-authorized service representative to administer and perform tests and inspections on components, assemblies, and equipment installations, including connections.

4. Administer and perform tests and inspections[ with assistance of factoryauthorized service representative].

B. Administrant for Communications Tests and Inspections:

1. [Owner][Tenant] will engage qualified communications testing and inspecting agency to administer and perform tests and inspections.

2. Engage qualified communications testing and inspecting agency to administer and perform tests and inspections.

3. Engage factory-authorized service representative to administer and perform tests and inspections on components, assemblies, and equipment installations, including connections.

4. Administer and perform tests and inspections[ with assistance of factoryauthorized service representative].

C. Acceptance Testing Preparation:

1. <Insert requirements>.

D. Field tests and inspections must be witnessed by [Architect][Tenant][authorities having jurisdiction]<Insert names or titles of witnesses>.

E. Tests and Inspections:

1. Perform manufacturer's recommended tests and inspections.

2. Pull solid aluminum or wood test mandrel through duct to prove joint integrity and adequate bend radii, and test for out-of-round duct. Provide minimum 12 inch long mandrel equal to duct size minus 1/4 inch. If obstructions are indicated, remove obstructions and retest.

3. Conduit Placement:
a. Verify that center-line location and offsets are in accordance with the Drawings.
b. Verify that hangers and supports for conduits are attached to structure [in

Page 1477 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California
CONDUITS FOR ELECTRICAL SYSTEMS 260533.13 - 11
accordance with the Drawings][as directed by qualified structural engineer]. c. Verify that nuts on bolts or hanger rods are secure. d. Verify that space between raceways and cored holes are filled with nonshrinking grout or other approved material indicated on the Drawings and the Specifications.
e. Verify that expansion devices are installed at locations indicated on the Drawings and the Specifications.
f. Verify that ends are cut square to provide flush-butting surfaces when spliced and inside edges are free of burrs that could impede installation of cables.
g. Verify minimum separation of utilities, or that approved mechanical protection has been provided to surrounding conduit(s) where minimum separation cannot be achieved.

4. Document all changes on Record Drawings.

F. Nonconforming Work:

1. Conduit will be considered defective if it does not pass tests and inspections.

2. Remove and replace defective units and retest.

G. Field Quality-Control Reports: Collect, assemble, and submit test and inspection reports.

3.4 CLEANING
A. Verify that bentonite or other drilling fluids are contained and removed, and site is restored to its original or improved condition.

3.5 PROTECTION
A. Protect coatings, finishes, and cabinets from damage and deterioration.

1. Repair damage to galvanized finishes with zinc-rich paint recommended by manufacturer.

2. Repair damage to PVC coatings or paint finishes with matching touchup coating recommended by manufacturer.

END OF SECTION 260533.13

Page 1478 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 1
SECTION 260533.16 - BOXES AND COVERS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL

1.1 SUMMARY
A. Related Requirements:

1. Section 018116 "Facility Environmental Requirements" specifies temperature, humidity, acoustical, and other field conditions applicable to the Work specified in this Section.

2. Section 018123 "Facility Seismic and Wind Criteria" specifies seismic hazard, wind hazard, other structural load design conditions applicable to the Work specified in this Section.

3. Section 260010 "Supplemental Requirements for Electrical" specifies additional coordination, scheduling, sequencing, submittal, and installation requirements applicable to the Work for electrical, communications, and electronic safety and security systems on the Project, including wiring methods.

4. Section 078413 "Penetration Firestopping" specifies materials and methods for sealing penetrations of rated walls and partitions referenced by this Section.

5. Section 260526 "Grounding and Bonding for Electrical Systems" specifies grounding and bonding referenced by this Section.

6. Section 260553 "Identification for Electrical Systems" specifies electrical equipment labels and warning signs installed by this Section.

7. Section 260573 "Power System Studies" specifies arc-flash hazard analysis and warning labels referenced by this Section.

8. Section 270528 "Pathways for Communications Systems"[ and Section 271100 "Communications Equipment Room Fittings"] specifies additional requirements for identification of communications equipment and cabling.

1.2 DEFINITIONS
A. Communications Outlet: One or more communications jacks, or cables and plugs, mounted in a box or ring, with a suitable protective cover.

B. Enclosure: The case or housing of an apparatus, or the fence or wall(s) surrounding an installation, to prevent personnel from accidentally contacting energized parts or to protect the equipment from physical damage. Types of enclosures and enclosure covers include the following:

1. Cabinet: An enclosure that is designed for either surface mounting or flush mounting and is provided with a frame, mat, or trim in which a swinging door or doors are or can be hung.

2. Concrete Box: A box intended for use in poured concrete.

3. Conduit Body: A means for providing access to the interior of a conduit or tubing system through one or more removable covers at a junction or terminal point. In the United States, conduit bodies are listed in accordance with outlet box

Page 1479 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 2
requirements.

4. Conduit Box: A box having threaded openings or knockouts for conduit, EMT, or fittings.

5. Cover Plate: A cover designed for protecting wiring devices installed in flushmounted device boxes while permitting their safe operation; also called a faceplate or wallplate.

6. Cutout Box: An enclosure designed for surface mounting that has swinging doors or covers secured directly to and telescoping with the walls of the enclosure.

7. Device Box: A box with provisions for mounting a wiring device directly to the box.

8. Extension Ring: A ring intended to extend the sides of an outlet box or device box to increase the box depth, volume, or both.

9. Floor Box: A box mounted in the floor intended for use with a floor box cover and other components to complete the floor box enclosure.

10. Floor-Mounted Enclosure: A floor box and floor box cover assembly with means to mount in the floor that is sealed against the entrance of scrub water at the floor level.

11. Floor Nozzle: An enclosure used on a wiring system, intended primarily as a housing for a receptacle, provided with a means, such as a collar, for surfacemounting on a floor, which may or may not include a stem to support it above the floor level, and is sealed against the entrance of scrub water at the floor level.

12. Junction Box: A box with a blank cover that joins different runs of raceway or cable and provides space for connection and branching of the enclosed conductors.

13. Outlet Box: A box that provides access to a wiring system having pryout openings, knockouts, threaded entries, or hubs in either the sides or the back, or both, for the entrance of conduit, conduit or cable fittings, or cables, with provisions for mounting an outlet box cover, but without provisions for mounting a wiring device directly to the box.

14. Pedestal Floor Box Cover: A floor box cover that, when installed as intended, provides a means for typically vertical or near-vertical mounting of receptacle outlets above the floor's finished surface.

15. Pull Box: A box with a blank cover that joins different runs of raceway and provides access for pulling or replacing the enclosed cables or conductors.

16. Raised-Floor Box: A floor box intended for use in raised floors.

17. Recessed Access Floor Box: A floor box with provisions for mounting wiring devices below the floor surface.

18. Recessed Access Floor Box Cover: A floor box cover with provisions for passage of cords to recessed wiring devices mounted within a recessed floor box.

19. Ring: A sleeve, which is not necessarily round, used for positioning a recessed wiring device flush with the plaster, concrete, drywall, or other wall surface.

20. Ring Cover: A box cover, with raised center portion to accommodate a specific wall or ceiling thickness, for mounting wiring devices or luminaires flush with the surface.

21. Termination Box: An enclosure designed for installation of termination base assemblies consisting of bus bars, terminal strips, or terminal blocks with provision for wire connectors to accommodate incoming or outgoing conductors, or both.

C. Receptacle: A fixed connecting device arranged for insertion of a power cord plug. Also

Page 1480 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 3
called a power jack.

D. Receptacle Outlet: One or more receptacles mounted in a box with a suitable protective cover.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.

B. Samples: For each type of product requiring samples for source quality control.

C. Shop Drawings: Prepare and submit the following:

1. Shop Drawings for Floor Boxes: Show that floor boxes are located to avoid interferences and are structurally allowable. Indicate floor thickness [at location]where boxes are embedded in concrete floors and underfloor clearances where boxes are installed in raised floors.

D. Sustainable Design Submittals:

1. Product data for sustainable design features for each type of product.

1.4 INFORMATIONAL SUBMITTALS
A. Manufacturer's published instructions.

1.5 QUALIFICATIONS
A. Electrical Power Testing (EPT) Technician III: Possessing active NICET EPT Level III certification. Able to manage switching procedures; conduct tests of complex equipment; analyze test and equipment data; plan a job; and lead a team. Has experience performing NFPA 70B, IEEE, and NETA electrical tests.

B. Electrical Power Testing (EPT) Technician IV: Possessing active NICET EPT Level IV certification. Able to conduct tests of complex metering and relay systems; evaluate tests, test equipment, test results, and power system performance; recommend actions to maintain or improve system performance; and lead multi-team projects.

C. Inspection and Testing of Fire-Alarm Systems (I&TFAS) Technician I: Possessing active NICET I&TFAS Level I certification. Able to perform periodic inspections and tests of basic fire-alarm systems and prepare related records and reports.

D. Inspection and Testing of Fire-Alarm Systems (I&TFAS) Technician II: Possessing active NICET I&TFAS Level II certification. Able to plan, perform, and coordinate periodic inspections and tests of complex fire-alarm systems (including one or more of suppression interfaces, networked control units, smoke control interfaces, air sampling systems, multi-zone voice evacuation systems, or high-rise applications) and prepare related records and reports.

Page 1481 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 4
E. Electrical Power Testing and Inspecting Agency: Entities possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site electrical testing supervisors must possess active NICET EPT Technician [III][IV] certification.

F. Communications Testing and Inspecting Agency: Entity possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site communications testing supervisor must have [BICSI Technician (TECH)]<Insert certification program> certification and documented training, and be experienced with testing communications equipment in accordance with [BICSI]<Insert code enforced by authorities having jurisdiction> testing standards.

G. Security Testing and Inspecting Agency: Entity possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site security testing supervisor must have [ASIS][PSP]<Insert organization> certification and documented training and experience with testing security equipment in accordance with [ASIS]<Insert organization> testing standards.

H. Fire-Alarm Testing Agency: Entity possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site fire-alarm testing supervisor must possess active NICET I&TFAS Technician [I][II] certification.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Products or components listed and labeled in accordance with NFPA 70, by qualified electrical testing laboratory recognized by authorities having jurisdiction, and marked for intended location and application.

B. <Insert additional performance requirements for the Project>.

2.2 METALLIC OUTLET BOXES, DEVICE BOXES, RINGS, AND COVERS A. Source Quality Control:

1. Samples:
a. Floor Box Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors and flooring inserts for each

Page 1482 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 5
type of floor box.
b. Raised Floor Box Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors and flooring inserts for each type of floor box.
c. Recessed Access-Floor Box Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors and flooring inserts for each type of floor box.
d. Concrete Box Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors and flooring inserts for each type of floor box.

2.3 NONMETALLIC OUTLET BOXES, DEVICE BOXES, RINGS, AND COVERS A. Source Quality Control:

1. Samples:
a. Floor Box Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors and flooring inserts for each type of floor box.
b. Raised Floor Box Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors and flooring inserts for each type of floor box.
c. Recessed Access-Floor Box Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors and flooring inserts for each type of floor box.
d. Concrete Box Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors and flooring inserts for each type of floor box.

PART 3 - EXECUTION

3.1 SELECTION OF BOXES AND COVERS FOR ELECTRICAL SYSTEMS A. Unless more stringent requirements are specified in Contract Documents or manufacturers' published instructions, comply with NFPA 70 for selection of boxes and enclosures. Consult Architect for resolution of conflicting requirements.

B. Degree of Protection:

1. Outdoors:
a. [Type 3][Type 3R][Type 4] unless otherwise indicated. b. Locations Exposed to Hosedown: [Type 4][Type 4X][Type 6][Type 6P]. c. Locations Subject to Potential Flooding: Type 6P.
d. Locations Aboveground Where Mechanism Must Operate When Ice Covered: Type 3S.
e. Locations in-Ground or Exposed to Corrosive Agents: [Type 4X][Type

Page 1483 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 6
6P][Type 3RX].
f. Locations in-Ground or Exposed to Corrosive Agents Where Mechanism Must Operate When Ice Covered: Type 3SX.

2. Indoors:
a. Type 1 unless otherwise indicated.
b. Damp or Dusty Locations: [Type 12][Type 2][Type 4][Type 5]. c. Surface Mounted in Kitchens and Other Locations Exposed to Oil or Coolants: Type 12.
d. Flush Mounted in Kitchens and Other Locations Exposed to Oil or Coolants: [Type 12][Type 12K].
e. Locations Exposed to Airborne Dust, Lint, Fibers, or Flyings: [Type 4][Type 6].
f. Locations Exposed to Hosedown: [Type 4][Type 6][Type 6P]. g. Locations Exposed to Brief Submersion: [Type 6][Type 6P]. h. Locations Exposed to Prolonged Submersion: Type 6P.
i. Locations Exposed to Corrosive Agents: [Type 4X][Type 6P]. j. Locations Exposed to Spraying Oil or Coolants: Type 13.

C. Exposed Boxes Installed Less Than 2.5 m (8 ft) Above Floor:

1. [Provide cast-metal boxes][Boxes with knockouts or unprotected openings are prohibited].

2. Provide exposed cover. Flat covers with angled mounting slots or knockouts are prohibited.

3.2 INSTALLATION OF BOXES AND COVERS FOR ELECTRICAL SYSTEMS A. Comply with manufacturer's published instructions.

B. Reference Standards for Installation: Unless more stringent installation requirements are specified in Contract Documents or manufacturers' published instructions, comply with the following:

1. Electrical Construction: ICC IBC, ICC IFC, NFPA 1, NFPA 70, and NECA NEIS

1. 2. Electrical Safety: NFPA 70E.

3. Commissioning of Active and Passive Fire Protection Features: NFPA 3 and NFPA 4.

4. Grounding and Bonding: NECA NEIS 331 and Article 250 of NFPA 70.

5. Communications Work: BICSI N1.

6. Life Safety and Means of Egress Work: NFPA 101.

7. Emergency and Standby Power Work: NFPA 110, NFPA 111, and NECA NEIS 416.

8. Work in Confined Spaces: NFPA 350.

9. Work in Basements and Other Developed Subterranean Spaces: NFPA 520.

10. Outlet, Device, Pull, and Junction Boxes: Article 314 of NFPA 70.

11. Consult Architect for resolution of conflicting requirements.

Page 1484 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 7
C. Special Installation Techniques:

1. Provide boxes in wiring and raceway systems wherever required for pulling of wires, making connections, and mounting of devices or fixtures.

2. Mount boxes at heights indicated on Drawings. If mounting heights of boxes are not individually indicated, give priority to ADA requirements. Install boxes with height measured to [center][top][bottom] of box unless otherwise indicated.

3. Recessed Boxes in Masonry Walls: Saw-cut opening for box in center of cell of masonry block, and install box flush with surface of wall. Prepare block surfaces to provide a flat surface for a raintight connection between box and cover plate or supported equipment and box, whether installed indoors or outdoors.

4. Horizontally separate boxes mounted on opposite sides of walls so they are not in the same vertical channel.

5. Locate boxes so that cover or plate will not span different building finishes.

6. Support boxes in recessed ceilings independent of ceiling tiles and ceiling grid.

7. Support boxes of three gangs or more from more than one side by spanning two framing members or mounting on brackets specifically designed for purpose.

8. Fasten junction and pull boxes to, or support from, building structure. Do not support boxes by conduits.

9. Set metal floor boxes level and flush with finished floor surface.

10. Set nonmetallic floor boxes level. Trim after installation to fit flush with finished floor surface.

11. Do not install aluminum boxes, enclosures, or fittings in contact with concrete or earth.

12. Do not rely on locknuts to penetrate nonconductive coatings on enclosures.

Remove coatings in the locknut area prior to assembling conduit to enclosure to ensure a continuous ground path.

13. Boxes and Enclosures in Areas or Walls with Acoustical Requirements:
a. Seal openings and knockouts in back and sides of boxes and enclosures with acoustically rated putty.
b. Provide gaskets for cover plates and covers.

14. <Insert more stringent installation requirements that supplement or supersede listed standards and manufacturers' published instructions>.

D. Interfaces with Other Work:

1. Identification: Provide labels for boxes and associated electrical equipment. a. Identify field-installed conductors, interconnecting wiring, and components. b. Label each enclosure with engraved metal or laminated-plastic nameplate. c. Provide warning signs and arc-flash hazard warning labels for electrical equipment.

2. Coordinate installation of new products for <Insert system or product family/category> with existing conditions.
a. <Insert requirements for transition between new and existing>.

3. Coordinate with <Insert Section number and title> for <Insert description of

Page 1485 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 8
interfacing related Work>.
a. <Insert requirements for transition between this Section and related Work>.

3.3 FIELD QUALITY CONTROL OF BOXES AND COVERS
A. Administrant for Electrical Power Tests and Inspections:

1. [Owner][Tenant] will engage qualified medium-voltage electrical testing and inspecting agency to administer and perform tests and inspections.

2. Engage qualified medium-voltage electrical testing and inspecting agency to administer and perform tests and inspections.

3. Engage factory-authorized service representative to administer and perform tests and inspections on components, assemblies, and equipment installations, including connections.

4. Administer and perform tests and inspections[ with assistance of factoryauthorized service representative].

B. Administrant for Communications Tests and Inspections:

1. [Owner][Tenant] will engage qualified communications testing and inspecting agency to administer and perform tests and inspections.

2. Engage qualified communications testing and inspecting agency to administer and perform tests and inspections.

3. Engage factory-authorized service representative to administer and perform tests and inspections on components, assemblies, and equipment installations, including connections.

4. Administer and perform tests and inspections[ with assistance of factoryauthorized service representative].

C. Administrant for Security Tests and Inspections:

1. [Owner][Tenant] will engage qualified security testing and inspecting agency to administer and perform tests and inspections.

2. Engage qualified security testing and inspecting agency to administer and perform tests and inspections.

3. Engage factory-authorized service representative to administer and perform tests and inspections on components, assemblies, and equipment installations, including connections.

4. Administer and perform tests and inspections[ with assistance of factoryauthorized service representative].

D. Administrant for Fire-Alarm Tests and Inspections:

1. [Owner][Tenant] will engage qualified fire-alarm testing and inspecting agency to administer and perform tests and inspections.

2. Engage qualified fire-alarm testing and inspecting agency to administer and perform tests and inspections.

3. Engage factory-authorized service representative to administer and perform tests and inspections on components, assemblies, and equipment installations,

Page 1486 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

BOXES AND COVERS FOR ELECTRICAL

SYSTEMS
260533.16 - 9
including connections.

4. Administer and perform tests and inspections[ with assistance of factoryauthorized service representative].

E. Acceptance Testing Preparation:

1. <Insert requirements>.

F. Field tests and inspections must be witnessed by [Architect][Tenant][authorities having jurisdiction]<Insert names or titles of witnesses>.

G. Tests and Inspections:

1. Perform manufacturer's recommended tests and inspections.

2. Perform tests and inspections recommended by standards listed in "Reference Standards for Installation" Paragraph.

H. Nonconforming Work:

1. Boxes and covers will be considered defective if they do not pass tests and inspections.

2. Remove and replace defective units and retest.

I. Field Quality-Control Reports: Collect, assemble, and submit test and inspection reports.

3.4 CLEANING
A. Remove construction dust and debris from boxes before installing cover plates, covers, and hoods.

3.5 PROTECTION
A. After installation, protect boxes from construction activities. Remove and replace items that are contaminated, defaced, damaged, or otherwise caused to be unfit for use prior to acceptance by Owner.

END OF SECTION 260533.16

Page 1487 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SURFACE RACEWAYS FOR ELECTRICAL

SYSTEMS
260533.23 - 1
SECTION 260533.23 - SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL

1.1 SUMMARY
A. Related Requirements:

1. Section 018116 "Facility Environmental Requirements" specifies temperature, humidity, acoustical, and other field conditions applicable to the Work specified in this Section.

2. Section 018123 "Facility Seismic and Wind Criteria" specifies seismic hazard, wind hazard, and other structural design conditions applicable to the Work specified in this Section.

3. Section 260010 "Supplemental Requirements for Electrical" specifies additional coordination, scheduling, sequencing, submittal, and installation requirements applicable to the Work for electrical, communications, and electronic safety and security systems on the Project, including wiring methods.

4. Section 260526 "Grounding and Bonding for Electrical Systems" specifies grounding and bonding referenced by this Section.

5. Section 260553 "Identification for Electrical Systems" specifies warning signs referenced by this Section.

6. Section 270528 "Pathways for Communications Systems"[ and Section 271100 "Communications Equipment Room Fittings"] specifies additional requirements for identification of communications equipment and cabling.

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.

B. Samples: For each type of product requiring samples for source quality control.

C. Sustainable Design Submittals:

1. Product data for sustainable design features for each type of product.

1.3 INFORMATIONAL SUBMITTALS
A. Manufacturer's published instructions.

1.4 QUALIFICATIONS
A. Electrical Power Testing (EPT) Technician III: Possessing active NICET EPT Level III certification. Able to manage switching procedures; conduct tests of complex equipment; analyze test and equipment data; plan a job; and lead a team. Has

Page 1488 of 1878 ends

NUVIS
22-040.01
Hermosa Beach Pickle Ball
Court Improvements
Hermosa Beach, California

SURFACE RACEWAYS FOR ELECTRICAL

SYSTEMS
260533.23 - 2
experience performing NFPA 70B, IEEE, and NETA electrical tests.

B. Electrical Power Testing (EPT) Technician IV: Possessing active NICET EPT Level IV certification. Able to conduct tests of complex metering and relay systems; evaluate tests, test equipment, test results, and power system performance; recommend actions to maintain or improve system performance; and lead multi-team projects.

C. Electrical Power Testing and Inspecting Agency: Entities possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site electrical testing supervisors must possess active NICET EPT Technician [III][IV] certification.

D. Communications Testing and Inspecting Agency: Entity possessing active credentials from a qualified electrical testing laboratory recognized by authorities having jurisdiction.

1. On-site communications testing supervisor must have [BICSI Technician (TECH)]<Insert certification program> certification and documented training, and be experienced with testing communications equipment in accordance with [BICSI]<Insert code enforced by authorities having jurisdiction> testing standards.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Products or components listed and labeled in accordance with NFPA 70, by qualified electrical testing laboratory recognized by authorities having jurisdiction, and marked for intended location and application.

2.2 SURFACE METAL RACEWAYS AND FITTINGS
A. Source Quality Control:

1. Samples:
a. Surface Metallic Raceway Nonmetallic Cover Samples for Initial Selection:

Manufacturer's standard color sheets, showing full range of available colors for each type, [12 inch]<Insert dimension> long.

2.3 SURFACE NONMETALLIC RACEWAYS
A. Source Quality Control:

1. Samples:

Page 1489 of 1878 ends