65270.00021\44884509.1
with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the Contract or not. Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these Contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.
3. COMPENSATION: CONTRACTOR agrees to receive and accept the prices set forth in its Bid Proposal $89,285.00 as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid Contract documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.
4. TIME OF PERFORMANCE: CONTRACTOR agrees to complete the work within 25 working days from the date of the notice to proceed. By signing this Agreement, CONTRACTOR represents to CITY that the Contract time is reasonable for completion of the work and that CONTRACTOR will complete such work within the Contract time.
5. LIQUIDATED DAMAGES: In accordance with Government Code section 53069.85, it is agreed that CONTRACTOR will pay to CITY the sum set forth in Exhibit “A” for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, CONTRACTOR agrees CITY may deduct that amount from any money due or that may become due CONTRACTOR under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.
6. SUBSTITUTION OF SECURITIES: Pursuant to section 22300 of the Public Contract Code of the State of California, CONTRACTOR may request CITY to make retention payments directly to an escrow agent or may substitute securities for any money withheld by CITY to ensure performance under the Contract. At the request and expense of CONTRACTOR, securities equivalent to the amount withheld shall be deposited with CITY or with a state or federally chartered bank as the escrow agent who shall return such securities to CONTRACTOR upon satisfactory completion of the Contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in section 22300 of the Public Contract Code.
7. PREVAILING WAGES AND CALIFORNIA LABOR LAWS.
Pursuant to Labor Code §§ 1720 et seq., and as specified in 8 California Code of Regulations § 16000 (“Prevailing Wage Laws”), CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR’s responsibility to interpret and implement any prevailing wage requirements, and CONTRACTOR agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws. CONTRACTOR shall defend, indemnify and hold the CITY, its officials,
65270.00021\44884509.1
officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. CONTRACTOR and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.
In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY’s Engineering Division or the website for State of California Prevailing wage determination at http://www.dir.ca.gov/DLSR/PWD. CONTRACTOR must post a copy of the prevailing rate of per diem wages at the job site.
CITY directs CONTRACTOR’s attention to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONTRACTOR or any subcontractor.
Labor Code § 1777.5 requires CONTRACTOR or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the Contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:
When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or When the number of apprentices in training in the area exceeds a ratio of one to five, or When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis statewide or locally, or
Assignment of an apprentice to any work performed under a public works Contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
When CONTRACTOR provides evidence that CONTRACTOR employs registered apprentices on all of his Contracts on an annual average of not less than one apprentice to eight journeymen.
CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if CONTRACTOR employs registered apprentices or journeymen in any apprenticeable trade on such Contracts and if other Contractors on the public works site are making such contributions.
CONTRACTOR and any subcontractor must comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices.
65270.00021\44884509.1
Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, exofficio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
The CONTRACTOR or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.
CONTRACTOR and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of CONTRACTOR in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, CONTRACTOR shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such CONTRACTOR must comply with this section. Should noncompliance still be evident after such 10-day period, CONTRACTOR shall, as a penalty to CITY, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A Contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works Contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on CONTRACTOR. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.
Any ineligible Contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.
By executing this Contract, CONTRACTOR verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same.
8. LEGAL HOURS OF WORK: Eight (8) hours of labor shall constitute a legal day's work for all workmen employed in the execution of this Contract, and CONTRACTOR and any subcontractor under it shall comply with and be governed by the laws of the State of California having to do with working hours set forth in Division 2, Part 7, Chapter 1, Article 3 of the Labor Code of the State of California as amended.
65270.00021\44884509.1
CONTRACTOR shall forfeit, as a penalty to City, twenty-five dollars ($25.00) for each laborer, workman or mechanic employed in the execution of the Contract, by him or any subcontractor under it, upon any of the work hereinbefore mentioned, for each calendar day during which the laborer, worker or mechanic is required or permitted to labor more than eight (8) hours in any one calendar day or 40 hours in any one calendar week in violation of the Labor Code.
9. PUBLIC WORKS CONTRACTOR REGISTRATION: Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations (DIR). No bid will be accepted nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the DIR to perform public work. Notwithstanding the foregoing, the Contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
10. LABOR COMPLIANCE AND STOP ORDERS: This Project is subject to compliance monitoring and enforcement by the DIR. It shall be CONTRACTOR’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the DIR against CONTRACTOR or any subcontractor that affect CONTRACTOR’s performance of Work, including any delay, shall be CONTRACTOR’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONTRACTOR caused delay subject to any applicable liquidated damages and shall not be compensable by the CITY. CONTRACTOR shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONTRACTOR or any subcontractor.
11. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS: Contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any Contract on a public works project entered into between a Contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works Contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a Contractor on the Project shall be returned to the CITY. CONTRACTOR shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.
12. LABOR/EMPLOYMENT SAFETY: CONTRACTOR shall comply with all applicable laws and regulations of the federal, state, and local government, including Cal/OSHA requirements and requirements for verification of employees’ legal right to work in the United States CONTRACTOR shall maintain emergency first aid treatment for its employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4. CONTRACTOR shall ensure the availability of emergency medical services for its employees in accordance with California Code of Regulations, Title 8, Section 1512.
65270.00021\44884509.1
CONTRACTOR shall submit the Illness and Injury Prevention Program and a Project site specific safety program to CITY prior to beginning Work at the Project site. CONTRACTOR shall maintain a confined space program that meets or exceeds the CITY Standards. CONTRACTOR shall adhere to CITY’s lock out tag out program
13. TRAVEL AND SUBSISTENCE PAY: CONTRACTOR agrees to pay travel and subsistence pay to each worker needed to execute the work required by this Agreement as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Labor Code Section 1773.8.
14. CONTRACTOR'S LIABILITY: The City of Hermosa Beach and its officers, agents and employees ("Indemnitees") shall not be answerable or accountable in any manner for any loss or damage that may happen to the work or any part thereof, or for any of the materials or other things used or employed in performing the work; or for injury or damage to any person or persons, either workers or employees of CONTRACTOR, of its subcontractors or the public, or for damage to adjoining or other property from any cause whatsoever arising out of or in connection with the performance of the work. CONTRACTOR shall be responsible for any damage or injury to any person or property resulting from defects or obstructions or from any cause whatsoever.
To the fullest extent permitted by law, CONTRACTOR will indemnify Indemnities against and will hold and save Indemnitees harmless from any and all actions, claims, damages to persons or property, penalties, obligations or liabilities that may be asserted or claimed by any person, firm, entity, corporation, political subdivision, or other organization arising out of or in connection with the work, operation, or activities of CONTRACTOR, its agents, employees, subcontractors or invitees provided for herein, whether or not there is concurrent passive negligence on the part of City. In connection therewith:
a. CONTRACTOR will defend any action or actions filed in connection with any such claims, damages, penalties, obligations or liabilities and will pay all costs and expenses, including attorneys' fees, expert fees and costs incurred in connection therewith.
b. CONTRACTOR will promptly pay any judgment rendered against CONTRACTOR or Indemnitees covering such claims, damages, penalties, obligations and liabilities arising out of or in connection with such work, operations or activities of CONTRACTOR hereunder, and CONTRACTOR agrees to save and hold the Indemnitees harmless therefrom. c. In the event Indemnitees are made a party to any action or proceeding filed or prosecuted against CONTRACTOR for damages or other claims arising out of or in connection with the work, operation or activities hereunder, CONTRACTOR agrees to pay to Indemnitees and any all costs and expenses incurred by Indemnitees in such action or proceeding together with reasonable attorneys' fees.
65270.00021\44884509.1
Contractor's obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this agreement, to the extent required by Civil Code section 2782, Contractor shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.
So much of the money due to CONTRACTOR under and by virtue of the Contract as shall be considered necessary by City may be retained by City until disposition has been made of such actions or claims for damages as aforesaid.
It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California. This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law.
This indemnity is effective without reference to the existence or applicability of any insurance coverage which may have been required under this Agreement or any additional insured endorsements which may extend to Indemnitees.
CONTRACTOR, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the CONTRACTOR regardless of any prior, concurrent, or subsequent passive negligence by the Indemnitees.
15. THIRD PARTY CLAIMS. In accordance with Public Contract Code § 9201, CITY will promptly inform CONTRACTOR regarding third-party claims against CONTRACTOR, but in no event later than ten (10) business days after CITY receives such claims. Such notification will be in writing and forwarded in accordance with the “Notice” section of this Agreement. As more specifically detailed in the Contract documents, CONTRACTOR agrees to indemnify and defend the City against any third-party claim.
16. WORKERS COMPENSATION: In accordance with California Labor Code Sections 1860 and 3700, CONTRACTOR and each of its subcontractors will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, CONTRACTOR, by signing this Contract, certifies as follows: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
65270.00021\44884509.1
17. INSURANCE: CONTRACTOR shall procure and maintain for the duration of the Agreement, and for 1 year thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the CONTRACTOR, its agents, representatives, employees, or subcontractors. a. Minimum Scope and Limit of Insurance. Coverage shall be at least as broad as:
i. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. ii. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage. iii. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
iv. Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions.
v. Professional Liability (if Design/Build), with limits no less than $2,000,000 per occurrence or claim, and $4,000,000 policy aggregate.
vi. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions (if project involves environmental hazards) with limits no less than $1,000,000 per occurrence or claim, and $4,000,000 policy aggregate.
vii. If the Contractor maintains broader coverage and/or higher limits than the minimums shown above, the CITY requires and shall be entitled to the broader coverage and/or the higher limits maintained by CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY. b. Self-Insured Retentions. Self-insured retentions must be declared to and approved by the CITY.
At the option of the CITY, either: the CONTRACTOR shall obtain coverage to reduce or eliminate such self-insured retentions as respects the CITY, its officers, officials, employees, and volunteers; or the CONTRACTOR shall provide a financial guarantee satisfactory to the CITY guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or CITY.
c. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions:
65270.00021\44884509.1
i. The CITY, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the CONTRACTOR including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the CONTRACTOR. General liability coverage can be provided in the form of an endorsement to the CONTRACTOR’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
ii. For any claims related to this project, the CONTRACTOR’s insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the CITY, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the CITY, its officers, officials, employees, or volunteers shall be excess of the CONTRACTOR’s insurance and shall not contribute with it. iii. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the CITY.
d. Builder’s Risk (Course of Construction) Insurance.
i. CONTRACTOR may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the CITY as a loss payee as their interest may appear.
ii. If the Project does not involve new or major reconstruction, at the option of the CITY, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery, and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the CITY’s site.
e. Claims Made Policies. If any coverage required is written on a claims-made coverage form:
i. The retroactive date must be shown, and this date must be before the execution date of the Contract or the beginning of Contract work.
ii. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of Contract work.
iii. If coverage is cancelled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the Contract effective, or start of work date, the CONTRACTOR must purchase extended reporting period coverage for a minimum of five (5) years after completion of Contract work.
65270.00021\44884509.1
iv. A copy of the claims reporting requirements must be submitted to the CITY for review. v. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
f. Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the CITY.
g. Waiver of Subrogation. CONTRACTOR hereby agrees to waive rights of subrogation which any insurer of CONTRACTOR may acquire from CONTRACTOR by virtue of the payment of any loss. CONTRACTOR agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the CITY for all work performed by the CONTRACTOR, its employees, agents and subcontractors.
h. Verification of Coverage. CONTRACTOR shall furnish the CITY with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to CITY before work begins.
However, failure to obtain the required documents prior to the work beginning shall not waive the CONTRACTOR’s obligation to provide them. The CITY reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
i. Subcontractors. CONTRACTOR shall require and verify that all subcontractors maintain insurance meeting all requirements stated herein, and CONTRACTOR shall ensure that CITY is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13. j. Special Risks or Circumstances. CITY reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances. k. Supplemental Insurance Requirements. In addition to the requirements of the foregoing, the insurance required by this Agreement shall also meet the following requirements imposed by the Los Angeles Development Authority (“LACDA”) and the County of Los Angeles (“County”):
65270.00021
\44884509.1
65270.00021\44884509.1
l. To the extent that this Agreement required insurance in favor of the CITY, such insurance shall also be maintained on no less favorable terms in favor of LACDA and the County, and to the extent that this Agreement requires insurance in favor of the LACDA or the County, such insurance shall also be maintained on no less favorable terms in favor of the CITY.
18. COMPLIANCE WITH CARB REGULATIONS:
a. Contractor shall comply, and shall ensure all subcontractors comply, with all applicable requirements of the most current version of the regulations imposed by California Air Resources Board (“CARB”) including, without limitation, all applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”). b. Throughout the Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and its subcontractors’ fleets including, without limitation, the Certificates of Reported Compliance (“CRCs”), fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City.
c. Contractor shall be solely liable for any and all costs associated with compliance with the Regulation as well as for any and all penalties, fines, damages, or costs associated with any and all violations, or failures to comply with the Regulation. Contractor shall defend, indemnify and hold harmless the City, its officials, officers, employees and authorized volunteers free and harmless
65270.00021\44884509.1
from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Regulation.
19. ASSIGNMENT: This Contract is not assignable nor the performance of either party's duties delegable without the prior written consent of the other party. Any attempted or purported assignment or delegation of any of the rights of obligations of either party without the prior written consent of the other shall be void and of no force and effect.
20. INDEPENDENT CONTRACTOR: CONTRACTOR is and shall at all times remain as to the CITY, a wholly independent Contractor. Neither the CITY nor any of its agents shall have control of the conduct of CONTRACTOR or any of CONTRACTOR'S employees, except as herein set forth. CONTRACTOR shall not at any time or in any manner represent that it or any of its agents or employees are in any manner agents or employees of CITY.
21. TAXES: CONTRACTOR is responsible for paying all retail sales and use, transportation, export, import, special or other taxes and duties applicable to, and assessable against any work, materials, equipment, services, processes and operations incidental to or involved in this Contract.
CONTRACTOR is responsible for ascertaining and arranging to pay them. The prices established in the Contract shall include compensation for any taxes CONTRACTOR is required to pay by laws and regulations in effect at the bid opening date.
22. LICENSES: CONTRACTOR represents and warrants to CITY that it has all licenses, permits, qualifications, insurance, and approvals of whatsoever nature which are legally required of CONTRACTOR to practice its profession. CONTRACTOR represents and warrants to CITY that CONTRACTOR shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits, insurance, and approvals which are legally required of CONTRACTOR to practice its profession. CONTRACTOR shall maintain a City of Hermosa Beach business license, if required under CITY ordinance.
Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against Contractors if a complaint regarding a patent act or omission is filed within five (5) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a Contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.
23. RECORDS: CONTRACTOR shall maintain accounts and records, including personnel, property, and financial records, adequate to identify and account for all costs pertaining to this Agreement and such other records as may be deemed necessary by CITY or any authorized representative, and will be retained for five years after the expiration of this Agreement. All such records shall be made available for inspection or audit by CITY at any time during regular business hours.
24. SEVERABILITY. If any portion of these Contract documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent
65270.00021\44884509.1
necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect.
25. WHOLE AGREEMENT: This Agreement supersedes any and all other agreements either oral or written, between the parties and contains all of the covenants and agreements between the parties pertaining to the work of improvements described herein. Each party to this Contract acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that any other agreement, statements or promise not contained in this Contract shall not be valid or binding. Any modifications of this Contract will be effective only if signed by the party to be charged.
26. AUTHORITY: CONTRACTOR affirms that the signatures, titles, and seals set forth hereinafter in execution of this Agreement represent all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest herein. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party. This Agreement may be modified by written amendment. CITY’s city manager may execute any such amendment on CITY’s behalf.
27. NOTICES: All notices permitted or required under this Agreement shall be in writing, and shall be deemed made when delivered to the applicable party’s representative as provided in this Agreement. Additionally, such notices may be given to the respective parties at the following addresses, or at such other addresses as the parties may provide in writing for this purpose. Such notices shall be deemed made when personally delivered or when mailed forty-eight (48) hours after deposit in the U.S. mail, first-class postage prepaid, and addressed to the party at its applicable address.
CITY OF HERMOSA BEACH
1315 Valley Drive
Hermosa Beach, CA 90254
Attention: Magvern By, Project Manager
CONTRACTOR:
TVR Construction Engineering LLC
4230 Michael St., Riverside CA 92507
Attention: Gergis Bebawy, Owner
28. DISPUTES. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less.
Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code.
This Section shall be construed to be consistent with said statutes.
65270.00021\44884509.1
Claims. For purposes of this Section, “Claim” means a separate demand by CONTRACTOR, after a change order duly requested in accordance with the terms of this Contract has been denied by the CITY, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of CONTRACTOR pursuant to the Contract, or (C) an amount the payment of which is disputed by the CITY. A “Claim” does not include any demand for payment for which CONTRACTOR has failed to provide notice, request a change order, or otherwise failed to follow any procedures contained in the Contract Documents. Claims governed by this Section may not be filed unless and until CONTRACTOR completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order procedures contained herein, and CONTRACTOR’s request for a change has been denied in whole or in part. Claims governed by this Section must be filed no later than fourteen (14) days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the CITY and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing in this Section is intended to extend the time limit or supersede notice requirements otherwise provided by Contract for the filing of claims, including all requirements pertaining to compensation or payment for extra Work, disputed Work, and/or changed conditions. Failure to follow such Contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.
Supporting Documentation. The CONTRACTOR shall submit all claims in the following format:
Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made
List of documents relating to claim:
Specifications
Drawings
Clarifications (Requests for Information)
Schedules
Other
Chronology of events and correspondence
Analysis of claim merit
Analysis of claim cost
Time impact analysis in CPM format
If CONTRACTOR’s claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the Project, CONTRACTOR shall provide a summary of the percentage of the claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions.
Cover letter and certification of validity of the claim, including any claims from subcontractors of any tier, in accordance with Government Code section 12650 et seq.
65270.00021\44884509.1
City’s Response. Upon receipt of a claim pursuant to this Section, CITY shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide CONTRACTOR a written statement identifying what portion of the claim is disputed and what portion is undisputed.
Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the public entity issues its written statement.
If CITY needs approval from its governing body to provide the CONTRACTOR a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, CITY shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide CONTRACTOR a written statement identifying the disputed portion and the undisputed portion.
Within 30 days of receipt of a claim, CITY may request in writing additional documentation supporting the claim or relating to defenses or claims CITY may have against the CONTRACTOR.
If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of CITY and the CONTRACTOR.
CITY’s written response to the claim, as further documented, shall be submitted to CONTRACTOR within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by CONTRACTOR in producing the additional information or requested documentation, whichever is greater.
Meet and Confer. If the CONTRACTOR disputes CITY’s written response, or CITY fails to respond within the time prescribed, the CONTRACTOR may so notify CITY, in writing, either within 15 days of receipt of CITY’s response or within 15 days of CITY’s failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, CITY shall schedule a meet and confer conference within 30 days for settlement of the dispute.
Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, CITY shall provide the CONTRACTOR a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after CITY issues its written statement. Any disputed portion of the claim, as identified by CONTRACTOR in writing, shall be submitted to nonbinding mediation, with CITY and CONTRACTOR sharing the associated costs equally. CITY and CONTRACTOR shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing unless the parties agree to select a mediator at a later time.
If the Parties cannot agree upon a mediator, each Party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each Party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
65270.00021\44884509.1
For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the Parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
Unless otherwise agreed to by CITY and CONTRACTOR in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
The mediation shall be held no earlier than the date CONTRACTOR completes the Work or the date that CONTRACTOR last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation unless a new unrelated claim arises after mediation is completed.
Procedures After Mediation. If following the mediation, the claim or any portion remains in dispute, CONTRACTOR must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time CONTRACTOR submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference or mediation.
Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this Section:
Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures.. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.
If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.
In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.
65270.00021\44884509.1
Government Code Claims. In addition to any and all Contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, claims and/or changed conditions, CONTRACTOR must comply with the claim procedures set forth in Government Code sections 900 et seq. prior to filing any lawsuit against the CITY. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, claims, and/or changed conditions have been followed by CONTRACTOR. If no such Government Code claim is submitted, or if any prerequisite Contractual requirements are not otherwise satisfied as specified herein, CONTRACTOR shall be barred from bringing and maintaining a valid lawsuit against the CITY. A Government Code claim must be filed no earlier than the date the work is completed or the date CONTRACTOR last performs work on the Project, whichever occurs first.
A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.
Non-Waiver. CITY’s failure to respond to a claim from CONTRACTOR within the time periods described in this Section or to otherwise meet the time requirements of this Section shall result in the claim being deemed rejected in its entirety. CITY’s failure to respond shall not waive CITY’s rights to any subsequent procedures for the resolution of disputed claims.
29. NON-DISCRIMINATION: Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. A violation of this section exposes CONTRACTOR to the penalties provided for in Labor Code Section 1735.
30. TERMINATION: This Contract may be terminated by CITY at any time, either with our without cause, by giving CONTRACTOR three (3) days advance written notice. In the event of termination by CITY for any reason other than the fault of CONTRACTOR, CITY shall pay CONTRACTOR for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, CITY may terminate the Contract immediately without notice, may reduce payment to CONTRACTOR in the amount necessary to offset CITY’s resulting damages, and may pursue any other available recourse against CONTRACTOR. CONTRACTOR may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, CITY may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, CITY may require CONTRACTOR to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by CONTRACTOR in connection with its performance of this Contract.
31. ANTI-TRUST CLAIMS: This provision shall be operative if this Contract Agreement is applicable to California Public Contract Code Section 7103.5. In entering into this Contract Agreement to supply goods, services or materials, Contractor hereby offers and agrees to assign to the Agency all rights, title, and interest in and to all causes of action it may have under Section
65270.00021\44884509.1
4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Contract Agreement. This assignment shall be made and become effective at the time the Agency tender final payment to Contractor, without further acknowledgment by the Parties.
32. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor’s or the City’s obligations under this Contract.
33. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents.
34. FORCE MAJEURE. If CONTRACTOR is delayed in the performance or progress of the work by a Force Majeure Event, then the CONTRACTOR shall be entitled to a time extension, as provided in the Contract documents, when the work stopped is on the critical path and shall not be charged liquidated damages. Such a non-compensable adjustment shall be CONTRACTOR’s sole and exclusive remedy for such delays and the CONTRACTOR will not receive an adjustment to the Contract price or any other compensation. Contractor must submit a timely request in accordance with the requirements of the Contract documents. A Force Majeure Event shall mean an event that materially affects a party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the project site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the work); (4) pandemics, epidemics or quarantine restrictions; and (5) strikes and other organized labor action occurring at the project site and the effects thereof on the work, only to the extent such strikes and other organized labor action are beyond the control of CONTRACTOR and its subcontractors, of every tier, and to the extent the effects thereof cannot be avoided by use of replacement workers. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of the City in its capacity as a municipal authority.
35. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.
36. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature.
65270.00021\44884509.1
37. GOVERNING LAW: This Agreement shall be governed by the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement with all the formalities required by law on the respective dates set forth opposite their signatures.
State of California
CONTRACTOR'S License No. 1064223
CONTRACTOR
TVR Construction Engineering LLC
4230 Michael St., Riverside, CA 92507
_________________ By: ____________________________________________ Date Gergis Bebawy, Owner
CITY OF HERMOSA BEACH, CALIFORNIA
_________________ By: ____________________________________________ Date Steve Napolitano, City Manager
ATTEST:
By: ____________________________________________
Date Martha Alvarez, City Clerk
CONTRACTOR'S Business Phone ___________________________________________ Emergency Phone at which CONTRACTOR can be reached at any time: ( )__________ APPROVED AS TO FORM:
_______________________________________________________________ Jason Baltimore, Interim City Attorney
__________________
Date
CITY OF HERMOSA BEACH
RESOLUTION NO. 26-XXXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HERMOSA
BEACH APPROVING THE CONSTRUCTION OF CAPITAL IMPROVEMENT PROJECT NUMBER 626 (“CIP 626”) COMMUNITY DEVELOPMENT
BLOCK GRANT (“CDBG”) IMPROVEMENTS, AWARDING A PUBLIC
WORKS CONTRACT, AND ESTABLISHING A PROJECT PAYMENT
ACCOUNT
WHEREAS, the City of Hermosa Beach (“City”) has the authority to implement actions for the protection of public health, safety, and welfare (to include the construction, maintenance, and improvement of public streets, sidewalks, and related infrastructure within the public right-of-way) pursuant to California Streets and Highways Code Sections 1800 et seq., California Government Code Section 37359, and the California Constitution (Section 7 to Article XI); and
WHEREAS, the City is further obligated under the Americans with Disabilities Act (Section 12101 et seq. to Title 42 of the U.S. Code)(“ADA”) and California Government Code Sections 4450 et seq. to ensure that public facilities (including sidewalks and curb ramps) are accessible to persons with disabilities; and WHEREAS, the City has identified the need to reconstruct curb ramps and sidewalks along Monterey Boulevard to improve pedestrian safety and accessibility, and to comply with the ADA; and
WHEREAS, CIP 626 (“Project”) consists of the reconstruction of eleven (11) curb ramps and approximately four hundred nineteen (419) square feet of sidewalk; and WHEREAS, the Project is funded in whole or in part through CDBG funds provided by the U.S. Department of Housing and Urban Development, and is therefore subject to applicable Federal and state labor and procurement requirements; and
WHEREAS, the City issued a Notice Inviting Bids in accordance with the California Public Contract Code (including but not limited to Sections 20160 et seq.), and received eleven (11) bids on February 12, 2026; and
WHEREAS, the bid process complied with applicable public contracting requirements, including bidder security pursuant to Public Contract Code Section 20170 and competitive bidding procedures; and
WHEREAS, City staff reviewed all bids and determined that TVR Construction Engineering, LLC (“TVR”) is the lowest responsive and responsible bidder in the amount of $89,285; and
WHEREAS, the City Council (“Council”) finds that the contract award is consistent with the requirement to award to the lowest responsive and responsible bidder under California law; and
WHEREAS, the Council desires to approve the plans and specifications for purposes of design immunity pursuant to California Government Code Section 830.6, award the construction contract, authorize a contingency, and establish a project payment account.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. Recitals. The recitals above are true and correct, and are hereby incorporated herein by reference.
SECTION 2. California Labor Code (“Labor Code”) Compliance. The Council hereby finds that the Project is a “public works” project subject to Labor Code Sections 1720 et seq., including prevailing wage requirements under Section 1773 and contractor registration requirements under Section 1725.5. As such, the Project shall comply with all applicable labor laws including but not limited to the following: (a) prevailing wage requirements (Labor Code Sections 1770-1773); (b) contractor registration (Labor Code Section 1725.5); and (c) apprenticeship requirements (Labor Code Section 1777.5) and applicable Federal labor standards associated with CDBG funding.
SECTION 3. Approval and Authorization. The Council hereby approves and authorizes the following:
a. Approval of Plans and Specifications. The plans and
specifications for the Project are approved conferring design immunity pursuant to California Government Code Section 830.6.
b. Award of Contract. The Council awards the construction contract for the Project to TVR (as the lowest responsive and responsible bidder) in the amount of $89,285 in accordance with the California Public Contract Code. c. Authorization of Contingency. The Director of Public Works is authorized to establish a Project contingency in an amount not to exceed $17,857 (approximately 20%), and to approve change orders within such contingency amount consistent with applicable law.
d. Contract Execution Authority. The City Manager is authorized to execute the construction contract and any necessary amendments or related documents, subject to approval as to form by the City Attorney. e. Project Payment Account. A Project payment account is established for the Project, funded through the CDBG Fund, with sufficient appropriations to cover construction and contingency costs.
f. Notice of Completion. The Director of Public Works is authorized to file a Notice of Completion upon final completion of the Project pursuant to applicable law.
SECTION 4. Design Immunity. The approval and authorization granted by this Resolution is intended to avail the City and the City’s delegated officers of the immunities set forth in California Government Code Section 830.6 with regards to the plans and construction of the Project. The City Engineer finds that the plans are complete and the Project may be constructed.
a. The design and plans for the Project are determined to be consistent with the City’s standards and are approved.
b. The design approval set forth in this Resolution occurred before actual work on the Project construction commenced. c. The approval granted by this Resolution conforms with the City’s General Plan.
d. The City Engineer, or designee, is authorized to act on the City’s behalf in approving any alterations or modifications of the design and plans approved by this Resolution; and
SECTION 5. California Environmental Quality Act (“CEQA”). The Council finds that the Project is categorically exempt from CEQA pursuant to CEQA Guidelines Section 15301 (Class 1 - Existing Facilities) because it consists of minor repair, rehabilitation, and replacement of existing sidewalks and curb ramps within the public right-of-way with no expansion of use or capacity. The Council further finds that no exceptions under CEQA Guidelines Section 15300.2 apply including that the Project will not result in significant environmental effects; cumulative impacts; or impacts to scenic, hazardous, or historical resources. The Director of Public Works, or designee, is hereby authorized and directed to file a Notice of Exemption with the Los Angeles County Clerk and the State Clearinghouse (if applicable) in accordance with CEQA Guidelines Sections 15062 and 21152 of the California Public Resources Code.
SECTION 6. Severability. If any section or provision of this Resolution is for any reason held to be invalid or unconstitutional by any court of competent jurisdiction, or contravened by reason of any preemptive legislation, the remaining sections and/or provisions of this Resolution shall remain valid. The Council hereby declares that it would have adopted this Resolution, and each section or provision thereof, regardless of the fact that any one or more section(s) or provision(s) may be declared invalid or unconstitutional or contravened via legislation.
SECTION 7. Certification. The City Clerk shall certify to the passage and adoption of this Resolution; cause the same to be entered among the original resolutions of the City; and make a minute of the passage and adoption thereof in the records of the proceedings of the Council in the minutes of the meeting at which time same is passed and adopted.
SECTION 8. Effective Date. This Resolution is effective immediately upon adoption.
PASSED, APPROVED and ADOPTED on this 14th day of April 2026. ______________________________________________________________________________ Mayor Mike Detoy
PRESIDENT of the City Council and MAYOR of the City of Hermosa Beach, CA
ATTEST: APPROVED AS TO FORM:
_______________________________ ________________________________ Martha Alvarez Jason Baltimore
City Clerk Interim City Attorney
!
"
#$%&'()*)+(&,-.--(/0-
$&
12345614257 89:;7<<<<<<<<<<<<<<<<<<<
427 1=:>?@A;BC?D9E;9FG
6F:=HIJKBDK9H::?6K:G?B=:>8;L;I9:;MN>:G;1=:>1?KHF=L A;BC?D9E;9FGO19L=@?BH=9OPQRST
U9M=;D9HMV;H:L;C;H7
4G;KHM;BD=IH;MM;FL9B;D:G9:G;WDG;G9DF9B;@KLL>;X9C=H;M:G;L?F9:=?H?@:G;YB?Y?D;MZ?B[ 9HM:G9:G;WDG;G9D;X9C=H;M:G;JL9HD9HM\Y;F=@=F9:=?HDOG9DB;9M:G;1?H:B9F:8?FKC;H:DO9HM G;B;N>9IB;;D:?@KBH=DG9LLL9N?BOC9:;B=9LDO;]K=YC;H:O:??LDO:B9HDY?B:9:=?HO9HMD;B^=F;D:?M? 9LLZ?B[B;]K=B;M@?B7
!
"
#$%&'()*)+(&,-.--(/0-
$&
_H9FF?BM9HF;Z=:G:G;JL9HD9HM\Y;F=@=F9:=?HDYB;Y9B;MN>:G;`HI=H;;BO=H9FF?BM9HF;Z=:G:G; \Y;F=9LJB?^=D=?HDO:G;1?H:B9F:8?FKC;H:DO9HM=H9FF?BM9HF;Z=:G:G;\:9HM9BM\Y;F=@=F9:=?HD @?BJKNL=Fa?B[D1?HD:BKF:=?HRQRObH=@=;MEK=LM=HI1?M;@?B1?HD:BKF:=?HcFKBB;H:;M=:=?Hd c;XF;Y:\;F:=?HDePdO9HM:G;B;]K=B;C;H:D?@:G;`HI=H;;BKHM;BD9=MM?FKC;H:DO@?B:G;YB=F;D DG?ZHG;B;=Hf
g
#((&-*h*-g(gi-g*-j*-)+*gg0(/#h#)%-*(& &(*#-
&&+,-g(&&k/0&)+*g*#
")($-h/g)(g*)*-*--%)k$ g
#j*#
1?H:B9F:?B\=IH9:KB;Ja155;I=D:B9:=?H3KCN;B
TVR Construction Engineering LLC 02/12/2026 1000640510
!"#$%%&$'#!()*%))+#,-) !
./
01234567879:7;<=>?@
01234567879A2=8?@
B293=4C32=D4E>F
G9C4?>2H49I87?C=>J49CIK>3L>>93M>L2=8?4983M>H7;<=>?N3M>L2=8??M455J=>O475PGH3M><973 J=7C>4983M>323454E2<93H2=49I73>E4=>923794;=>>E>93N3M><973J=7C>4529>?M455K> , .
)&,#$
Q #
&
& )&-&
RS( #,
+R
&
& T#!
U VW
X2K757Y43729498Z>E2K757Y43729
0[\E4]P2H32345K78?CM>8<5>
C2?3@
^_`Pa
_ b
VW 1=4HH7CB293=25 cd_`P[Pe
cd_^ _ b
af W: g>E2O>h]7?379;W78>L45i `d`_[Pf b b
j hk g>E2O>h]7?379;B<=Kg4EJ `d`_[Pf b b
af W: B29?3=<C3lBBW78>L45i `d`_[Pf b b
hk
B29?3=<C3kZkB2EJ57493lBB
B<=Kg4EJJ>=WllABW1Z
l549_[NB4?>kN1IJ>`
`d`_[Pf
b b
` hk
B29?3=<C3kZkB2EJ57493lBB
B<=Kg4EJJ>=WllABW1Z
l549_[NB4?>kN1IJ>a
`d`_[Pf
m a hk
B29?3=<C3kZkB2EJ57493lBB
B<=Kg4EJJ>=WllABW1Z
l549_[NB4?>kN1IJ>c
`d`_[Pf
b b
n ` hk
B29?3=<C3kZkB2EJ57493lBB
B<=Kg4EJJ>=WllABW1Z
l549_[NB4?>6N1IJ>e
`d`_[Pf
b b
TVR Construction Engineering LLC
3,000.00 3,000.00
3,000.00 3,000.00
3.00 1,257.00
1,000.00 11,000.00
12.00 5,028.00
6,000.00 6,000.00
6,000.00 18,000.00
6,000.00 24,000.00
$ 89,285.00
Eighty-nine thousand two hundred eighty-five dollars.
!
"
#
#$#
%
&$##
'
&$
#
'(
#)*
%
++++++++++++++++++++++++++++++++++++++++++++++++++,--# $# #)*
(
.
-
#
/01
%
#)*
( 23
#.
#
4*#-
%%
(
5
-5( #
-5( #--(
#
#-4* #
#)#.
(6
7
6%
*
.
%#-
%*
8 *
7
#
# %*
4*
( #
%#
%*
#
5
)
9
2
7
#
:.#
*
;++++++++++++++++++++++++++++++++++++++++++
<=>
.
#
?;
:
#
@
?;+++++++++
7
#
7)
#6A#)
;++++++++++++++++++++++++++++++++++++++++++
10% Of the project amount TVR Construction Engineering LLC 1000640510 1064223 - A
!"#$%
&%'$"()*
))$+,) "
-
./012
3456789:;;6<2
9=>:?6>>@;;<6>>2
A6B6CD7?6372
A02
@EF:?GH=<>=4?FF7@=FD7<:FIJ6B6G4F6;KIFD6L:FIL7=?E:B EM7L:FIN4BB
L:FI78N6<57>4964EDOL4B:87<?:4
@EF:?GH=<>=4?FF7@=FD7<:FIJ6B6G4F6;KIFD6L:FIL7=?E:B2
H=<>=4?FF7I7=<C=KB:>D6;37F:E6P?Q:F:?G9:;>87<2
!"#$%
&%'$"()*
))$+,) "
-
AD6=?;6<>:G?6;;6EB4<6>FD4FD6M>D6D4>E4<68=BBI6R45:?6;FD6B7E4F:7?78FD6C<7C7>6;S7<TU FD4FD6M>D6D4>E4<68=BBI6R45:?6;FD6HB4?>4?;VC6E:8:E4F:7?>O4?;<64;FD64EE75C4?I:?G P?>F<=EF:7?>F79:;;6<>4?;D6<6KIC<7C7>6>F78=<?:>D4BB54F6<:4B>O54ED:?6<IOF77B>OB4K7<O4?; >6<Q:E6>4?;;74BBFD6S7<T?6E6>>4<IF7E75CB6F6FD6C<7W6EF:?4EE7<;4?E6S:FD>4:;HB4?>4?; VC6E:8:E4F:7?>4?;7FD6<L7?F<4EFJ7E=56?F>4FFD6:F65C<:E6>7?FD6K:;;:?G>ED6;=B6X
9Y2 APAZ[2
TVR Construction Engineering LLC
4230 Michael St.
Riverside, CA - 92507
(714) 927 6664
Gergis Bebawy Owner
!"#$%&'(
)(*'%+,-,, './,
#%
01234567831996:56:;87761<:1=
>?@<74567832;576<:3A:87B4CCD7E:F2576:CC69A4F7513G<2A<G2CCB98F:H:819B1<7I9518:A1J 5:F7CDK1<7L912A705M2125;N263K1<7053184A1295319N266783K1<23O89H93:CK1<7N26N956K1<7 I9518:A1K1<7P:21<B4CO78B98F:5A7N956KQ:88:51DN956K1<7O:DF751N956K1<7B7678:C 87R4287F7513K2B:5DK1<7OC:53:56SH7A2B2A:12953K1<7SH7A2:CO89M232953K:561<7@7A<52A:C O89M232953?
?@<74567832;576<:3KTD25M7312;:1295:11<732179B1<7G98U:5691<78G237K3:123B276<2F37CB :3191<75:1487:56C9A:12959B1<7G98U:56B4CCD25B98F76<2F37CB:319:CCA956212953:56 F:11783KG<2A<A:525:5DG:D:BB7A11<7G98U981<7A9311<7879B? ?@<74567832;576B4CCD4567831:5631<73A9H79BG98U:56<:3A<7AU76A:87B4CCD:CCG9863 :56B2;487325378176251<23O89H93:C:56<7B481<784567831:5631<:11<7I21DG2CC591T7 873H9532TC7B98:5D788983989F2332953251<7H87H:8:12959B1<7O89H93:C? V?@<74567832;576:;8773:56:AU59GC76;731<:1<723:G:879B1<7H89M2329539BS7A1295WXX 9B1<7Y:T98I967G<2A<87R428737M78D7FHC9D7819T72534876:;:2531C2:T2C21DB98G98U783Z A9FH753:12959819456781:U737CB[25348:5A725:AA986:5A7G21<1<7H89M2329539B1<:1I967K :561<:11<74567832;576G2CCA9FHCDG21<34A<H89M232953T7B987A9FF75A25;1<7 H78B98F:5A79B1<7I9518:A12B2123:G:8676191<74567832;576? @<74567832;576G2CC7E7A4171<7I9518:A1:56B48523<1<787R4287631:14198DT9563:56 A7812B2A:1739B25348:5A7G21<251<7H782969B12F73H7A2B276251<7I9518:A1\9A4F7513? @<74567832;576G2CCT7;25G98U:B178:G:869BI9518:A1:56:L912A719O89A776<:3T775;2M75 :3<787253H7A2B276:56G2CCA9FHC7173:26G98UG21<251<712F73H7A2B276251<7N26625;SA<764C7? ]?@<74567832;576A7812B2731<:11<23O89H93:C23;754257:565913<:F98A9CC432M7K98F:6725 1<7251787319895T7<:CB9B:H78395591<787255:F76K:561<74567832;576<:35916287A1CD 98256287A1CD2564A769839C2A2176:5D91<78N2667819H4125:3<:FT265982564A76:5D91<78 H78395KB28FK98A98H98:12951987B8:25B89FT26625;? ^?@<74567832;576G2CC:AA7H1:5:G:86:56751782519:I9518:A1B98:CCG98U3A<764C76<78725 95G<2A<<7H41325:T26?@<7:G:863B9834A<G98U:8719T7751287CD:11<7623A871295 9B1<7_G578:B1787M:C4:12959B1<7T263:334TF21176?@<74567832;576:;87731<:11<7 _G5783<:CC87A9M7898871:25:3C2R426:1766:F:;73:5:F94517R4:C191<762BB7875A7T71G775 1<7C9GT26:56:F94519B1<7T269B1<7N26678G21<G<9F1<7I21D7517832519:I9518:A1K:56 1<7348HC43K2B:5DK3<:CCT787148576191<7C9G731N2667825:AA986:5A7G21<1<7H89M2329539B 1<7O4TC2AI9518:A1I96737A1295X>WV251<77M7519B<23B:2C487197E7A417:I9518:A1:56 B48523<87R42876T9563:5625348:5A71<787B98G21<251<712F7H89M2676? W?@<23T26G2CC591T7G21<68:G5G21<25:H782969B52571D`aXb6:D3:B1781<76:179B213 H89H789H7525;TD1<7I21D?
!
"
#!
$
%
&$
!$'!
"
(
#
!
)
#
*
#
&$
!$'
)
#
#&+
,
,
&
-
"
,
.
/
0
TVR Construction Engineering LLC
4230 Michael St.,
Riverside CA - 92507
(714) 927 6664
Owner Gergis Bebawy Owner 1064223 - A
02/12/2026
!
"#$%&'(
)(*'%+,-
,,'./,#%
0112334567189:88;187167<5=61>8>?6@5>AB>?6957C451>6;D648E=67>59561>?F>5>;861G8> ;51=75C5GF>65G5>16C348AC6G>E5>?76:F7;>87F=6B=8487B7645:58GB16HB87GF>58GF4875:5GI>?F>5> 515G=8C345FG=6E5>?F44F3345=FD4696;67F4B1>F>6BFG;48=F4;576=>5<61BFG;6H6=2>5<687;671 76:F7;5G:G8GJ;51=75C5GF>58G5G6C348AC6G>IFG;>?F>5>F:7661>83271263815>5<64AFG; F::76115<64A>?6375G=5346896K2F483387>2G5>A5G6C348AC6G>L
M6F:766136=595=F44AN
OLP861>FD451?878D167<66C348AC6G>3845=561E?5=?F9957CF>5<64A378C8>683387>2G5>561987 C5G875>A36718G1F>F44Q8D46<641L
LP8=8CC2G5=F>6>?513845=A>8F4436718G1=8G=67G6;B5G=42;5G:F44=8C3FGA6C348A661B 82>15;676=725>5G:167<5=61B6136=5F44A>?816167<5G:C5G875>A=8CC2G5>561BFG;>8>?6C5G875>A =8CC2G5>561F>4F7:6L
RLP8>FS6F9957CF>5<61>631>8?576C5G875>A6C348A661E5>?5G>?6=8C3FGAL TUVW
PUPXYZT[YV\Z]\U^]U]^
\U^]0P_VY
`0PY
[46F165G=42;6FGAF;;5>58GF45G987CF>58GF<F54FD4676:F7;5G:6K2F483387>2G5>A6C348AC6G> 378:7FC1G8E5G6996=>E5>?5GA827=8C3FGAN
TVR Construction Engineering LLC Gergis Bebawy
02/12/2026
!"#$%&'
()'*&$+,-
,,&./,"$
0121314567895:46;<=<6>=67?5@8<6>ABCC67895D1E64F6G539<@945HI<455;54J52:K6J5486 E5<>=I45G1L1<>=8K<1E<K<8J764M64N54=OF62:5>=18<6>6486I>G5481N5=5K7P<>=I41>@5<> 1@@64G1>@53<89895:46;<=<6>=678918F6G5Q1>G03<KK@62:KJ3<89=I@9:46;<=<6>=E57645 @6225>@<>L895:5476421>@567895364N6789<=F6>841@8RS?5@8<6>TUTQD1E64F6G5RV
?<L>18I45W
X125W Y<8K5W X12567F62:1>JW
TVR Construction Engineering LLC Gergis Bebawy
Owner
!!! "#$%
& '()
#*
&'+!,+-+.
/
0$%1
2%345
44
6740
%+
#&+&
89:;<=:>?@A<:=BC=;DEC;F9G>@H:=>:I>:?:<FCF@J:GKF9:LG<F>CMFG>BM:>F@K@:?C<==:MDC>:?F9CFN OP89:;<=:>?@A<:=LG<F>CMFG>@?CQC>:GKR:MF@G<OOPOC<=OPGKF9:LCD@KG><@CSCTG> LG=:BQ9@M9I>G9@T@FCLG<F>CMFG>G>?;TMG<F>CMFG>Q9G9C?T::<KG;<=TEF9:SCTG> LGUU@??@G<:>G>F9:V@>:MFG>GKW<=;?F>@CDX:DCF@G<?FGT:@<J@GDCF@G<GKM:>FC@<I>GJ@?@G<?GK F9:SCTG>LG=:BK>GUT@==@<AG<BT:@<ACQC>=:=BG>I:>KG>U@<AQG>YC?C?;TMG<F>CMFG>G<C I;TD@MQG>Y?I>GZ:MFKG>?I:M@K@:=I:>@G=?GKF@U:P
P89:;<=:>?@A<:=LG<F>CMFG>@?<GF@<:D@A@TD:FGT@=G<BT:CQC>=:=G>I:>KG>UQG>YC?C ?;TMG<F>CMFG>G<CI;TD@MQG>Y?I>GZ:MFTEJ@>F;:GKF9:KG>:AG@<AI>GJ@?@G<?GKR:MF@G<?OOPO G>OPGKF9:LCD@KG><@CSCTG>LG=:G>C<EGF9:>I>GJ@?@G<GKDCQP [P89:;<=:>?@A<:=LG<F>CMFG>@?CQC>:GKLCD@KG><@C\;TD@MLG<F>CMFLG=:R:MF@G<]O^_BQ9@M9 ?FCF:?N
`abcdefghijklmimnobpqkrilkqilskjmitluuvvwtrmxkyfghijLG<F>CMFLG=:zBUCE<GFI:>U@FC LG<F>CMFG>G>?;TMG<F>CMFG>Q9G@?@<:D@A@TD:FGT@=G>QG>YG<BG>T:CQC>=:=BCI;TD@MQG>Y? I>GZ:MFI;>?;C<FFGR:MF@G<OPOG>OPGKF9:SCTG>LG=:FGT@=G<BT:CQC>=:=BG>I:>KG>U QG>YC?C?;TMG<F>CMFG>G<BCI;TD@MQG>Y?I>GZ:MFP{J:>EI;TD@MQG>Y?I>GZ:MF?9CDDMG<FC@<C I>GJ@?@G<I>G9@T@F@<ACLG<F>CMFG>K>GUI:>KG>U@<AQG>YG<CI;TD@MQG>Y?I>GZ:MFQ@F9C ?;TMG<F>CMFG>Q9G@?@<:D@A@TD:FGI:>KG>UQG>YG<F9:I;TD@MQG>Y?I>GZ:MFI;>?;C<FFGR:MF@G< u||u}ut~u|||}|trmxkbgt~tqk}
`agcdlnLG<F>CMFG<CI;TD@MQG>Y?I>GZ:MF:<F:>:=@<FGT:FQ::<CLG<F>CMFG>C<=C=:TC>>:= ?;TMG<F>CMFG>@?JG@=C?CUCFF:>GKDCQP=:TC>>:=?;TMG<F>CMFG>UCE<GF>:M:@J:C<EI;TD@M UG<:EKG>I:>KG>U@<AQG>YC?C?;TMG<F>CMFG>G<CI;TD@MQG>Y?LG<F>CMFBC<=C<EI;TD@MUG<:E F9CFUCE9CJ:T::<IC@=FGC=:TC>>:=?;TMG<F>CMFG>TECLG<F>CMFG>G<F9:I>GZ:MF?9CDDT: >:F;><:=FGF9:CQC>=@<ATG=EP89:LG<F>CMFG>?9CDDT:>:?IG<?@TD:KG>F9:ICEU:<FGKQCA:?FG QG>Y:>?GKC=:TC>>:=?;TMG<F>CMFG>Q9G9C?gkklbhhtkqmtt~tlmxke~t kjm}
P89:;<=:>?@A<:=LG<F>CMFG>9C?@<J:?F@ACF:=F9::D@A@T@D@FEGK:CM9C<=:J:>E?;TMG<F>CMFG>F9: ;<=:>?@A<:=LG<F>CMFG>@<F:<=?FG;?:G<F9@?I;TD@MQG>Y?I>GZ:MFBC<==:F:>U@<:=F9CF<G<:GK F9:U@?@<:D@A@TD:FGI:>KG>UQG>YC?C?;TMG<F>CMFG>G<CI;TD@MQG>Y?I>GZ:MFTEJ@>F;:GKF9: KG>:AG@<AI>GJ@?@G<?GKF9:\;TD@MLG<F>CMFLG=:BR:MF@G<?OOPOG>OPGKF9:SCTG>LG=:B G>C<EGF9:>I>GJ@?@G<GKDCQP
W=:MDC>:;<=:>I:<CDFEGKI:>Z;>E;<=:>F9:DCQ?GKF9:RFCF:GKLCD@KG><@CF9CFF9: KG>:AG@<A@?F>;:C<=MG>>:MFP{:M;F:=F9@?=CEGK BCF B
LCD@KG><@CP
R@A<CF;>:N
CU:N 8@FD:N CU:GKLGUIC<EN TVR Construction Engineering LLC Gergis Bebawy Owner
12th February Riverside
!"#$%&'(
)(*'%+,-,,'./, #%
0123452678942552:;<627=
><?@12AAAAAAAAAAAAAAAAAAABCAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAD@12E<6@F?<G849@12 CB629B849H85I
012H85874B@?<5284@1284@2627@BCDB6B4J21<;CBCD<4F34587:;B725E267B4DE<6@426718ED :B?E<4FD<77B:8<@8B4DB69<48K<@8B4DB6:B6EB6<@8B4I012H85879243842<454B@:B;;378L2B671<?I 012H855261<74B@5862:@;FB6845862:@;F8453:25B67B;8:8@25<4FB@126H85526@BE3@84<C<;72B6 71<?J85I012H855261<74B@5862:@;FB6845862:@;F:B;;3525D:B47E8625D:B448L25DB6<96225M8@1 <4FH85526B6<4FB422;72@BE3@84<71<?J85DB6@B62C6<84C6B?J855849I012H855261<74B@84 <4F?<4426D5862:@;FB6845862:@;FD7B391@JF<9622?24@D:B??348:<@8B4DB6:B4C2624:2M8@1 <4FB42@BC8N@12H85O68:2BC@12H85526B6<4FB@126H85526DB6@BC8N<4FBL2612<5DE6BC8@DB6 :B7@2;2?24@BC@12H85O68:2DB6BC@1<@BC<4FB@126H85526IP;;7@<@2?24@7:B4@<842584@12H85 <62@632I012H855261<74B@D5862:@;FB6845862:@;FD73J?8@@25187B6126H85O68:2B6<4F J62<G5BM4@1262BCDB6@12:B4@24@7@1262BCDB658L3;92584CB6?<@8B4B65<@<62;<@8L2@1262@BD@B <4F:B6EB6<@8B4DE<6@426718ED:B?E<4FD<77B:8<@8B4DB69<48K<@8B4DJ8552EB78@B6FDB6@B<4F ?2?J26B6<924@@1262BC@B2CC2:@3<@2<:B;;378L2B671<?J85D<451<74B@E<85D<45M8;;4B@E<FD <4FE267B4B624@8@FCB673:1E36EB72I
P4FE267B42N2:3@849@18752:;<6<@8B4B4J21<;CBC<H85526@1<@87<:B6EB6<@8B4DE<6@426718ED QB84@L24@362D;8?8@25;8<J8;8@F:B?E<4FD;8?8@25;8<J8;8@FE<6@426718EDB6<4FB@12624@8@FD1262JF 62E62724@7@1<@12B67121<7C3;;EBM26@B2N2:3@2D<455B272N2:3@2D@18752:;<6<@8B4B4J21<;C BC@12H85526I
>52:;<6234526E24<;@FBCE26Q36F34526@12;<M7BC@12R@<@2BCS<;8CB648<@1<@@12CB629B84987 @632<45:B662:@<45@1<@@18752:;<6<@8B4872N2:3@25B4AAAAAAAAAAT5<@2UD<@ AAAAAAAAAAAAAAAAAAAT:8@FUDAAAAAAAAAAAAAAAAAAAT7@<@2UI
VPWXYZH>[[X\
R>]VP0^\XYZH>[[X\
P[[\XRRYZH>[[X\
S>0_R0P0X`>O
TVR Construction Engineering LLC TVR Construction Engineering LLC 4230 Michael St.
Riverside CA - 92507
Owner 02/12/2026
Riverside CA
!"#$%&'((
)'*&$+,-(,,&./,
"$
0
%)'!&.,1&'',,,1/2!!#.3,&!'.&)$&'',,,4&$&,2/#3$) &5!),4*2)2)''2&,/4.',).)$&*+*)2)!2/&,4)%"&, ($$!&)!4.&)!.#,3#!
677777777777777777777777777777777777777777777777777777777777777777777777 89:;9<=>==?;@@ABCDEFGH>I;<HJ
7777777777777777777777777777777777777777777777777777777777777777777777777 KLMNLOPQNRNSTUONKVMWNXUYZVWR[\]^NO\_`aZXUbN\cdLOL^NX 7777777777777777777777777777777777777777777777777777777777777777777777777 7777777777777777777777777777777777777777777777777777777777777777777777777 7777777777777777777777777777777777777777777777777777777777777777777777777 89:;9<=e;f9GF;=e;@H?GgfGA<ABC?Ah;Hf
7777777777777777777777777777777777777777777777777777777777777777777777 i?GIG<9FjA<f?9Hf>:AD<f i?GIG<9Fe9f;ABjA:gF;fGA< 77777777777777777777777777777777777777777777777777777777777 kG<9FjA<f?9Hf>:AD<f kG<9Fe9f;ABjA:gF;fGA<
8D:E;?ABjl9<I;i?=;?@777777777777
7777777777777777777777777777777777777777777777777777777777777777777777 89:;9<=>==?;@@ABCDEFGH>I;<HJ
7777777777777777777777777777777777777777777777777777777777777777777777777 KLMNLOPQNRNSTUONKVMWNXUYZVWR[\]^NO\_`aZXUbN\cdLOL^NX 7777777777777777777777777777777777777777777777777777777777777777777777777 7777777777777777777777777777777777777777777777777777777777777777777777777 7777777777777777777777777777777777777777777777777777777777777777777777777 89:;9<=e;f9GF;=e;@H?GgfGA<ABC?Ah;Hf
CDBG Sidewalk improvement
City of La Verne , 3660 “D” Street La Verne,CA92522
Cody Howing (909)594-9702
CDBG Sidewalk improvement
$74,678.00 Sep.2023
!"#$"%&'$($)*+%$!,#-$.+/0,-(1234$%25670.+8$29:"%"4$.
;
<=>?@@ABA=C?DEFGF>FCHFIJKDF?IF?@@IFK?>?BFILFFBI
MNOPNQ
RPSTUQNOPNQ TN
TVR Construction Engineering LLC
02/12/2026
126,205.00 Feb. 2024
CDBG ADA Curb Ramps Project
City of La Duarte 1600 Huntington Drive Duarte ,CA 91010 Brian Chau 626-357-7931
CDBG ADA Curb Ramps Project
$118,550.00 March 2024
!"#$%&'()(*'%+,-,,
'./, #%
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`F;3;86@7BO81BF<866K?C;<9CF9;K3C;< ;<953C;7313K;<9:3CW:<72<:766@9B319@P982<F?@231;C82;3C]a16P319F?@231;C82;3CK3C 982<F?2<53C;731F<866@967F;9B]
b3;:7;<F;81B71A;<9K3C9A371AO7K;<9:3CW71M36M9F;<9231F;C?2;7313KF;C99;F81B<7A<:8PFO ;<91;<9Q7BB9CF<86667F;982<F?@231;C82;3C:<3:76659CK3C4:3CW3C68@3C3CC91B9CF9CM729;3 ;<9Q7BB9C713C8@3?;;<9:3CW7181843?1;719X29FF3K319J<86K3K31959C291;SI]\_T3K;<9 Q7BB9Ccdefghijklmnkopfnqrstssstuvkovpwpnkdxnphgpnyzfhllkgkf{higk|pdvhii}pxnh{gplgf 5C3M7B9;<9@963:C9~?9F;9B71K3C48;731]
0K;<9N31;C82;3CK876F;3F5927KP8F?@231;C82;3CK3C81P53C;7313K;<9:3CW;3@959CK3C49B?1B9C ;<9N31;C82;O<9F<866@9B9949B;3<8M98AC99B;359CK3C4F?2<53C;731<74F96KO81B<9F<86613; @959C47;;9B;3F?@231;C82;;<8;53C;7313K;<9:3CW9X295;?1B9C;<9231B7;731F<9C9718K;9CF9; K3C;<]
>?@69;;71A3CF?@231;C82;71A3K81P53C;7313K;<9:3CW;3:<72<F?@231;C82;3C:8FB9F7A18;9B71 ;<93C7A7186@7BF<866316P@959C47;;9B7128F9F3K5?@672949CA912P3C1929FF7;PO81B;<91316P 8K;9C8K71B71AC9B?29B;3:C7;71A8F85?@672C923CB3K;<969A7F68;7M9@3BP3K;<9a:19C] //,$,%%*)"%),(,$"',',/$%) "' ()"
,),'%%$"',
,$"','%%%)",(#/
*+#'/.)"
$ "',
'. ((,,
,)/)"+
"')",
),')"
"
%%'.$"+-+
N/A
!
"#
$$
%&
!
"#
$$
%&
!
"#
$$
%&
!
"#
$$
%&
!
"
#
$
%!
!
"#
$%&'()*&'+,-./0*12&3*/4),0*5.236&/56.2+'7'56*23889:6;'.236&/562&5'&6*1*'%%),<'5662 ='3/06-12&='&<)&-6;/66;'2=6*235;'5>'+,'02?&'0/6*3@626;'.236&/562&ABBCDCEBFGHIJDHKCL 6;'M&/3.236&/56*3@$562189N9O4),0*5.236&/56.2+'7'56*238899PQRPSTU*%6&)'/3+52&&'56V W;'.236&/562&*%326V
ONU*+'36*1*'+236;'5)&&'360*%621='&%23/3+'36*6*'%'3@/@'+*3*3X'%6Y'36/56*X*6*'%*3M&/3 =&'=/&'+,-6;'./0*12&3*/Z'=/&6Y'3621['3'&/07'&X*5'%*3/552&+/35'?*6;%),+*X*%*23O,U21 4),0*5.236&/56.2+'7'56*23889\2&
O8U/1*3/35*/0*3%6&)56*236;/6']6'3+%:12&^+/-%2&Y2&':5&'+*6*36;'/Y2)3621_89:999:9992& Y2&'62/3-26;'&='&%232&'36*6-*+'36*1*'+236;'5)&&'360*%621='&%23%/3+'36*6*'%'3@/@*3@ *3*3X'%6Y'36/56*X*6*'%*3M&/3=&'=/&'+,-6;'./0*12&3*/Z'=/&6Y'3621['3'&/07'&X*5'%*3 /552&+/35'?*6;%),+*X*%*23O,U214),0*5.236&/56.2+'7'56*23889:*16;/6='&%232&'36*6- )%'%2&?*00)%'6;'5&'+*662=&2X*+'@22+%2&%'&X*5'%*36;''3'&@-%'562&*3M&/3T W;'.*6-;/%']'Y=6'+6;'.236&/562&1&2Y6;'&'()*&'Y'36%216;'M&/3.236&/56*3@$562189N9 /16'&Y/>*3@/=),0*51*3+*3@6;/6:/,%'366;'']'Y=6*23:6;'.*6-?*00,')3/,0'622,6/*36;' @22+%/3+`2&%'&X*5'%62,'=&2X*+'+=)&%)/36626;'.236&/56T W;'/Y2)36216;'.236&/56=/-/,0'626;'.236&/562&12&6;'4&2<'56+2'%326']5''+_N:999:999T 7*@3/6)&'V 4&*36'+a/Y'V W*60'V b*&Ya/Y'V Z/6'V a26'VM3/552&+/35'?*6;4),0*5.236&/56.2+'7'56*23889^:1/0%'5'&6*1*5/6*23216;*%12&Y%;/00 ,'&'=2&6'+626;'./0*12&3*/$662&3'-['3'&/0/3+Y/-&'%)06*35*X*0='3/06*'%'()/0626;'@&'/6'& 21_8^9:9992&6?*5'6;'.236&/56/Y2)36:6'&Y*3/6*23216;'.236&/56/3+`2&*3'0*@*,*0*6-62,*+ 23.236&/56%12&6;&''-'/&%T
TVR Construction Engineering LLC
02/12/2026
Gergis Bebawy
owner
!
"##$
%
&'()
"&''&)&*++!
$
" $
$
,
-%,
%"
* #+%
#"%
%".
.
+*
#
#%
!
$
.#/
0. +%$-
10
#
#2%
##"-%
,
,#3#.
0#
/4
"
%+5#+
%
)6##,
.788---)"%)$)2
98 +%$:
;
18 +%$;
1),
0+/
""%
%
+%
/
0
%
)
<
%"-%++ #$$#.
#"
=!
$
#
##"%
-%
,
.
/
/
,#!
$
>?@AB
$
$
?>CDEEFAGEFHI?GE@GIJAKIGLGLFMFN@EGOFAGJPQABD?GEI@RSFR@GIJA?GJNFEPJEONDTRIC -
1)
U%""#,## =$#
%/%#
,
%
%-#
/
,##2%
%
#V%#0#
#
/
,%
!
"#
#$
%
&'()
"&''&)&
"%$#
+=#2%
##"!
$
-%
,
,#3#.
0#
/
4 "
%+5#+
%
)&
<0#
/U%""#7WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
3455#2%
%
<0 #7WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
3455#2%
%
XY.%
%
7WWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
60++
Z#$
XY#0.
%
7WWWWWW[#
WWWWWW<
\ARF??]IBBFEI?F^FONGNDE?D@AGGJGLF?O@RRNEJ_FCGF^FONGIJA`]IBBFEPDEGLFE@CaAJKRFBHF?b &)U%""#,++0%
%
$#
345#2%
%
/
,#"
%
/
,#.
Z#$
)
()U%""#,++0%
%
$#
345#2%
%
/
,#"
%
/
,#.
Z#$
)
)U%""#,++%
$+"#
,##V%#0#
/
!
"##$
%
&'()
"&''&)&%
%
!
$
-%
, $
$
"#
#
,
++ $
$
##2%
##"
,#
%0#
/
%"
.#
%
2
"0%
%
#2%
%
/
,#"
%
/
,#.
Z#$
)
c)d%+#
0%
,%/
0
$
0.+=-%
,
=
/
,#
9##V%#0#
0=#+
%
/%
"%
2
,
,# %"%
:#.
%9#)
<0#
/U%""#WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
6%2
#WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
<0#
"e%
+#WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
3
#"WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW fghijklmnokpiqrksktuihmntijkvnwimxpinmmkyqrimxiqnwmkz{qmktkwiru{mr{xwiinijkrtx||umnokpiksktuiqnw{w}km~xnmvn}kkpiqnwr
TVR Construction Engineering LLC TVR Construction Engineering LLC Gergis Bebawy -owner
02/12/2026
1000640510 06/30/202
7
!"#$
!%&'(')"'"')
))*+,-./00+1234
56.-.7+8"8)
9)
#$
9)%&: );<=>?@A@B"((= CD2347EF2377-.70+GD2G.77.4200D23446.-.7H.I6J7.-KLI2D-.G2M.D2DND.3F.D3O42FI.D02DP-20 .QR6GP.OFR-.46OS37602DO63TUJ2GE20FI.1.NR73F62O6-3H3673C7.3F IFFG-VWWMMKT3DCTJ3TN2HW-6F.-W4.03R7FW067.-WC3DJRWD.N3JFWKXKKW200+D23446.-.7W3GG3+YTG40TZ644.D-3D. D.QR6D.4F2J2PG7EM6FI377SU1Z3O41.NR73F62OD.QR6D.P.OF-[6OJ7R46ON[M6FI2RF76P6F3F62O[377 3GG76J3C7.-.JF62O-20FI.1.NR73F62O[3-J24606.46O\6F7.Y20FI.S37602DO63S24.201.NR73F62O- -.JF62OK]]^.F-.QTFID2RNI2RFFI.F.DP20FI._D2`.JFTZ644.D-PR-FGD2H64.[M6FIFI.6DZ64[J2G6.- !""a-3O437776-F.4-RCJ2OFD3JF2D-FI.P2-FD.J.OF[H3764S.DF606J3F.201.G2DF.4S2PG763OJ. #$
%&
"b=
!c8)(;";"
d"'=")!"+
D.-G2O-6H.T
e f
e
ghhe
i j
gkf
e
\I.S6FE6-3_RC76Jl2Dm-UM3D46ONZ24E[3-4.06O.4RO4.D\6F7.YS37602DO63S24.201.NR73F62O- -.JF62OK]]^nJon]oTUJJ2D46ON7E[Z644.D-PR-F-RCP6F[M6FIFI.6DZ64-[3H3764S.DF606J3F.201.G2DF.4 '( #$
%&)!""a
")
)"
RCJ2OFD3JF2D-07..Fn6OJ7R46ON3OE3GG76J3C7.
7.3-.4.QR6GP.OF2DH.I6J7.-oTZ644.DPR-FJ2PG7.F.3O4-RCP6FFI.p7..FS2PG763OJ.S.DF606J3F62O[ )' "")b"( q9c8)(;";" )!""a
)?"
FI.07..F-2037776-F.4-RCJ2OFD3JF2D-[2D0367RD.F2J2PG7.F.FI.p7..FS2PG763OJ.S.DF606J3F62O[P3E D.O4.DFI.Z64O2O+D.-G2O-6H.T
rsst
uvwrxyz{s
s|tx}x{ytxuz
!""b= q:"9
)))=;;:")
!"a
(
?
DR7.-3O4D.NR73F62O-3O43D.03P6763DM6FIFI.D.QR6D.P.OF-20\6F7.Y[S37602DO63S24.201.NR73F62O-[ 56H6-62O[SI3GF.D^[.00.JF6H.2O~3OR3DEY[KXK]#)$ 9)%&c!""b= )
?
b )
)()=(=?)))() q"b:)9))!""a )?")))
b ) )#
&#$8)%&
)" )
\I.p7..F6--RC`.JFF2FI.D.QR6D.P.OF-20FI.1.NR73F62O[3O4FI.3GGD2GD63F. S.DF606J3F.n-o201.G2DF.4S2PG763OJ.I3H.C..O3FF3JI.4I.D.F2T
\I.p7..F6-..PGF0D2PFI.1.NR73F62ORO4.D-.JF62OK]]^TYn0onKo[3O43-6NO.44.-JD6GF62O 20FI.-RC`.JFH.I6J7.-[3O4D.3-2O6ON02D..PGF62OI3-C..O3FF3JI.4I.D.F2T
Z644.D3O4W2DFI.6D-RCJ2OFD3JF2D6-RO3C7.F2GD2JRD.1^^2D1YXXD.O.M3C7.46.-.70R.73-
4.06O.46OFI.1.NR73F62OGRD-R3OFF2-.JF62OK]]^TYn0onoTZ644.D-I377m..G4.F367.4D.J2D4-
4.-JD6C6ONFI.O2DP37D.0R.76ONP.FI24-[FI.6D3FF.PGF-F2GD2JRD.D.O.M3C7.46.-.70R.73O4 GD220FI3F-I2M-FI.EM.D.O2F3C7.F2GD2JRD.D.O.M3C7.46.-.7n6T.TFI6D4G3DFE J2DD.-G2O4.OJ.2DH.O42DC64-oT
!
!"
#$
!
!!
%&
'
(
!!
#
!)
#
!!
!)
!$
'
!
!
*
!!!
!
! '
+
(
!!,-------------------------------------------------
.
,--------------------------------------------------
+
,--------------------------------------------------
, --------------------------------------------------
/ , --------------------------------------------------
TVR Construction Engineering LLC
Gergis Bebawy -
owner
02/12/2026
!"##
$%
&
'$&
()*+ ,-./0123456758932:53;23..03::<9-=3::;0>5467;-4;?3/@545.152-3./ >54=-4A3.150./542@51-.24312-4?;BBC>-:7175;3./3==74A327653127-. DE
F
G H
$
$
$
I$
F
J
K
$
K
&EI
$L
MG
G
#IE#
EE
F
$%$
#
G
$
##
$%
&
DE
F
NF()+
G$IFG()*+OG
##$
#
$
$
P
$
$QI
$
$Q %%I
L
$
G
$
%
E
$F$IK#MG
G
G
$
$
%
%D
$
JK
$
K
%
L
D
$
J
#IE#
EE
F
L
$%$
#
DE
F
IJ
$NF()+
GIFG()*+
#
G
K
#
K$&
J
J
G
G
$
$
&
ELK
$
K
G
F$IK%
R
&
$L
##$
I$
G
G
F$IKG
K
&
%K
G
%KEL%
#%
$
JM%
G
JI
$L
I$
G
G
$
S5.5=72;-=2@5>4-T43A34545=:5125/7.2@51-.24312-4?;A7.-472<3./=5A3:58-4U #$
K
$
K
%
R
FJ#
G
##$
%
J
&
JI
EF
E
J
%
DE
J
K$&
J
J I%
MG
GJ
%
$
G
##
&
#
R
D
G
E##
G
$
$OG
DE
F
1-A>:<9@-8565497;2@51-.24312-4?;93./=37:045-=;01G F$IK
#IE#
EE
-S:7T327-.;@3::.-2S53/5=5.;5=-42@51-.24312-4?;.-.1-A>:73.15V
FE
F
E#$%
$
J
K
$
FE
F
E#$M%
G
&
D
DE
G
JOG
$
$GM
&
$
$
WI
$
J
K$&
J
WI
E
%KEL%
KK$
I
L
J
R
##
$%
&
#$
EE%
$
LF$IKD
G%
E
J
#
%
E
J
EEM%
D
G%
$
L
JQ%
$
LH
WI
EL
G
$
$%
LD
&
E
#
G
X
I
&
!$J
$
#
K
$
IE
$F$IK
%KEL
J
ID
EELJ
K
$
%
$(#$
X
%KE
&
GIFG
G
$
$G
G
&
J
F
E#$M%
F
$
EEL
G
$
$%
LD
&
E
#
G
X
I
&
!$J
$
#
K
#
%
$
LF$IK#M%
IJ
$I
E
Y
J+
POG
$
$G
EE
I
G
F
E
J
%
DE
#
##
$%
&
J
$J
J
$
%
F
LK
$D
I
#$
E$$
E
F
$
E$
F
ROG
$
$G
EE
$
LID
$
M
G
LK
$$#
$%
J
D
$$
J#$%&
$%
$
KI$I
X
I
&
!$J
$))Z*
EOG
$
$G
EE
$$LI
I G
JK
E
#$&
E
#
G
K
#
J#
G
WI
E!KK$
I
LHE
I
EIJ
FIK
$%
J
EE
#
X
FID
$
%
LD
%K
J$
$J
$
JKI$I
X
I
&
!$J
$))Z*
%
J
J
J
%KE
%
F
$
FIE
DL
G
!##
#[
J
$
EH
$
H%KE
'$F$
%L
$
$MG#
E
$$LI
I G
JK
E
G
EED
&
E
#
G
K
#
J X
I
&
!$J
$))Z*
%
J
J
% OG
$
$
#IE#
EE
F
DE
F
IJ
$
G
K
#
G
EE
%KE
%
K
#
##
$%
&
K
E
X
&
G
J
$J
K$
$
D
J
'
$
F$
KGNF#
G
K
#
G
&
%
X
%I%
$
IE
#$%
##$
I$
WI
E
%KEL%
KK$
I
L#
G
$
$
#
E
%KELM
G
G
$
WI
$
%
#
G
X
I
&
!$J
$
G
%KE
%
F
$
FIE
$
G
K
#
G
$
$G
EEK$
J
$J
M
G
Z)H[\'
$
*Q)](^GMH
I
_
+
!"
#$%!&'(
%"
'()(*&'(
%
+,-./0,1+2, -./0,1+234,.
1/-252, -6/2,
1/-25.,77
8 9:;:
<
=8
;
>?
@
A
?
8 9
@
B8C
97
DE9
@
1
>
98
FGHIJKILMNOPQOJMRSPJMMTMJUMVWXIUMJYIHMPZ[SJMLG\GPZ[YXPGHPXPYU]IJNIJ^MJ_[QIVWMZ[GYPIZ 8
=`
8 a
>9b
=8
8`
?
@
@
B8C
9
@
`
`?
>> AB>:
?
@= @B8C
;
98
AA
<
@
B
898A
9
@
?8a9
@
8
3+6/.c,/dd1e2, 3+6/.c,/dd1e++e,f1-1+5 3+6/.c,/dd1e72+3., +,
02/12/2026 Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 607325 TVR Construction Engineering LLC (714) 927 6664
4230 Michael St., Riverside, CA - 92507 Gergis Bebawy Owner Gergis Bebawy Owner
02/12/2026
!"#
$%&'()*
"+)
"
"&'(,
$"-*
"+)
"
./0123452 ./012345672/8/52539 30.5952 7:3054/34:;673054/340<</0654.=0525672/ 30.59/2;; >?5672/ <325;25672/2.<092/254>34055672/65;5672/2@< ABCDEFGDBEHIJDKLJDFKKJIMGBCDEFGDJBEJIMNDLOEGBCDEFGDJLCPBKPLCQKFMBEFDDROJLDOBSGBCJDEIGDLBCTEOQFEUKOJJBSUBKKFEFHBICDBEVOEGOCDFQOBSMLUW &'("&'(,XYZ[\]^X[_`X][abc d+e$fg%%"$
f+*%$h$#i*$d'e($" -*
"+)
"
)$*
$ d'e($" e#hj$" %$*
)+
* d'e($" kld& d'e($" -*
"+)
ge'*
e+
$% &
+"
k+
$
e+
$% -e#h$
* k+
$ "+%$m
n
($l
$%
64=0/o20>>3<5264=0/o20>>3<44<2:3.34964=0/o20>>3<;546/242 Gergis Bebawy
Owner
!"
#$# %$&
'
"$&$("$&)*
+#
,"
#$ -./01234154671. 8.41429
2/-4941
2/-49.1:: ;214:14671.1-;/91.143<23/44671.64:4671. 3=
>
?@
=
=
A>
A
BCD
E
=
F
=>
G
EA
@>BB??
>B
EH
BI=
J
>
E
=
KLMNOPQROMPSTUVWXYOMZPY[QW\WN]^Q]Y_Y`VWPYaYNOTbMPcYXYPQ\\deTTWTOYXLMNTOPVROWMNfQNX =
<
E
>
B;
H>:
E
>E->J
Cg6hij?>kD
E
=
H
=A
>
FE
>
E
=
>
lF
>
k
3=
?BBI
mA
>
E
m
E
=
A
@>BB??
>?>
=
kA
@
E
F
=>
G
E
m
=
:
k
?2kAB
=
I
BB
kA
@
=I
nB@2
>
?
E-
@>BB.
A>
?>
=
A>o
p q)rstuutvvspCE
J
EF
B.
A
HB
?>:
m
m:
k
?2kAB
D 41 33;1 :46.1 31 qswq)utxwsyzws)uq)swspC;
E2:;7-
>
B;
D 41 33;1 :46.1 31
Gergis Bebawy Owner
02/12/2026
Raffi Thomassian
Raffi Thomassian 02/12/2026
!"#$%%& &"'()*)(&!&+( &"'('%(
,-
.
/
0 1
!"#!"$%!&'$()*)%)!+,!#%)-)($%)
./0123452 ./012345672/783054/34099/0654 30.5:52 30.5:/2;; 9325;25672/2.90:2/254<34055672/65;5672/ 4= >
?
@
AABC
?
@D
@
@
@
>
=
=
8=
?
?E
AA
F G
@H@I
?
>@=
8=
@
JHAB
B
K@
K
?>
A
B> =
8=
@
LA
=J
.
@J
=
8=
@
JHAB
H
@>@J
=
@
@I
BA
D?
@=
8=
@
@AE=
@
K@
K
?>
A
@
J
? 4=
>
?
@
AAB
?
@
@
K@
=
L@
=>
=
@
>
I
A
>
=
2MD
A 0HH@
D
B3A
D
=
@
D
?
=
@
>
=
@J
K@
K
?>
A
J
BE
K@JE@N
@
@
@J
?E
=@J@
D@
?
=
@
K
@
J
A NA N
@@J
?
=
@
@
K
@?@
K
@
H
@N
KA
?@
N
K >D
@
@
@
@
J
@
@
H@
?=D
K>
A
H@I
?
?>@
JHAB
E=
=
@
K@
K
?LB
OHA
?
@
I
@
@
>
K@
K
?
=
L
> @
@
? A@@
A@
K
L
D
>=
L
A
A D
J@
=
@E
4=
>
?
@
AABC
?
@
@
K@
=
P
O
H
E=
@
=
8=
=
L
?
?
A
@
>
>@JH@H
?DL
@
@>@H
>
J
H
@
?Q=
8=
E
AAL
?
A
@
>
>@JH@H
?DL
@
@H@
@
=
E
@?>DL
@
O
?
KRG E=
=
@
O
JH
>@J
=
H@I
>
=
2MD
A0HH@
D
B3A
D
?
=
=
8=
E
AA @
D =
@
>
=
8=
@>
A
ST4=
H
A
B>@J
N
K>
A
J
>>
@
H@
@
L
?
GU6;3GG 64V0/W20<<395264V0/W20<<39449283.34: 64V0/W20<<39;546/242 Gergis Bebawy Owner
02/12/2026
!" #
$%&
'!'%
'"$ ()*+,-./, ()*+,-./01,)/01,)*2,(3*4,,5 -*(/4/, -*(/4),55 3-,/5,/01,),(3*4,),/.2-.*//01,)0/5/01,) .6 7
88 9 :9:
8;7<
9 96
9 7=
9 >
6 6
?6
6
6
:
9 :
8
:9
@
;
9 9;7
9 ;7A
6 ,B;
C*::9
;
=-C
;
9 B;
9 87=,D
;
@
*98
9EFGEEEEH9EEHI
8
6 6
?6
6
6
>
C
8J
6
6 +
)
:9
K-LL
6
9 9>
6 *>>
>2
8 9
C-
9 -L:C
MNONPQRSTUNPVWNVXYTVXPQYXZV[TPQOWZVZ\XNPZV[Q[NVY]^TPX_N`TPWNPaPN\ZONVXb\cLL
,B;
C,L:C=L
*::9
;
=
CC9
:9
8;
;8
9
6
::C
7C
>
C
K9
B;
9 L
def.6
:
C
=>9L
g
K>
C
L
>>
9
:9
9
7 8
Eh05-EE 0.i*)j,*22-3/,0.i*)j,*22-3..3,?-(-.4 0.i*)j,*22-35/.0),., def.6
7@
9 >
9
B;
9 87=
6 ,B;
C,L:C=L
*::9
;
=)
K;C
>
6 5
9 9= >3
79kHE-2)I<Elk7mkEm
8L;
7
;7L
87=7
88 9
8:9:
8;7
9 9C=
J
6
9
8;7
9 J6
6
9 ;7A
6
B;
C::9
;
= C
;
-
9
8;7
9 J6
6
9
D
L:
>9L
6
B;
C::9
;
= C
;
9
>9
6
HE-2)I<EG k
9 CC=C=
9 9;7
9 >nE9;8
9
9
D
L:
m(9:
8:9
L
9 9
8 ;7
9 9J66
@
:
9 :
8
:9
@
;
9 9;7
9 ;7A
6 ,D
;
@
*98
9
86
@
>
C
8
6 9
B;
9 89
:9
6;C8
6 HE-2)I<Elk7mkEm:9
@
6
J
98>
9
8;7
9 ;C
; 6
9 9;7L
9
:9
@
9 K
6 8
C
B;
:
9 89; 6
6 9 :
9 8:
>
87=
6 05
:
9 L
>
6
9 997=
6
9 9*>>
>2
8 9
C-
9 -L:C
05
:
9 L
>3
79 52<Ek,,*<EmL;
7
>
C
87=o kmCC:9
@
L:C=
9J6
9 o kEm5;7A
.
C
p>
6 -
@
C)
K6
>EFIHk
L
8
8mJ
6E9L9
L:C=
km5;7A
.
C
pJ66
>
J
9
6 E
L:C=
>
6 L:
=
J
89
>>
C
8J
6
6 9 L:
=9
6 9
9 C
q
8J
96
:
9C9L
K
L
6
6 K9;: C
K
CC=
;
KC
9:9
8
6
9
9:9
L:C=
C>E9L9
L:C=
k1mCC>
8 9
C
9 9k:9
@
L:C=
9mJ6o kEm9
D
L:
:9@
8 8>97=HE-2)I<EG kmi
@
G9L9
L:C=
8
9
:9
L
9 99>
9
<
9;7
9 9
86
@
9 ;7
9 9:;9 6
98
9
L;
K
nG9L9
r9 75
9@
8
:
9=>@
9L
>;8
=
L;
9
>
C
;
J6
6
;
K
8:
=
K
K
>9055
@
K18
8/
Gergis Bebawy Owner
02/12/2026
!
"#$%&'(&
)'!*
+((
,
$*
) -./ 01.234.560.07.5815951:51910--;11-< 5199
:5.=1<-01 :5.=1<-064154><.0-5<-.335.60- <.:0?01 <.:0?5199 3<1091064151:3.?1510-2<-.00641560906415 -@ 6A
B
C
A DBB
EF@EA
B
G
@
HEH
CIDAI
@
69H
BJ
B
DK
B
G
@
LB
J
B
B@EA
CD @
B
?D
B
AH
A
@
DA
B
@
LBH
I
@
KH
B
BDK
B
A
BA
G
@1M
D
H
.BA
BNNOP
@
DA
B
C
A
KE
C
A
A
B
J
C
F
JLEF
B
LLE
IB
JLEFJ
K
D
IB
EBB
E
C
MB
EB
C
-@
KE
C
A
B
J
JLEFJ
EDA
KD
E
J
A
@
IEEG/
NQ
B
CLE
J
DLCB
A
C
B
I
BBA
J
R 5
BD
J
AH
B
CBE
IB
JLEFJ
R S-B
J
ADB
C
JLEFJ
R O5
IL
FB
@
BIBJI JL
R T9
E
IB
B
C
EDA
C
LLB
@
LR
A P3
FIIB
BJ
-@
IDB
@
A
FDLDBD
@
LBH
I
@
KH
B
BDK
B
A 1M
D
H
.BA
BNNOP<L
I
@
G
EEK
L
AKF
@
DA
B
C
A
L
DD LE
H
E
KE
JLEF
B
LLE
IB
JLEFJ
+U-@
L
E
FIBJ
V
CI
E
J
II
B
LB
B
K
A
NW69<NN 6-Q.5X1.22<3016-Q.5X1.22<3--31><:<-? 6-Q.5X1.22<390-651-1 Gergis Bebawy Owner
02/12/2026
AGC of America
6212 Ferris Square , San Diego, CA, 92121
!"#
$%&'
()*+)
')),
!' -
)'./0123456 7.89.:;77;:<=>9;.<?9.7?<.@AA>B?;C<<D9C.@D9889.;C> 8@.B;7C77C?9.:@9C?9.D9C.@D9. EFGHIJFKELF GHIJFKELMNFH OHLF GPILF NMQLFQQHFQQ >89??.:R STUVWXYZV[Z\]^_`a\VbZc_^d[ea_Zf g
h
gi
jL
k
lIm
n Knon
Q
l non
p G
n
nq
orstuvwxyzysy{w|}z~uuxyt}~ L
k
lG
n
np J
in
J
in
G
n
o
p Lik
nl
nl
nkq
i
ig
non
m
nq
op 9=C.78<:9.@8D7R S]^_`a\VeUVZdV^_c_ZV^^[WV_^VZ\V^W[eV_^[Z\eUVV^WVZe[V_c_ZV^UaaZeV^Ve_ceU_VaZ\a`a\[f 4054 @5C34/ @/245545 @45 8445/2 =43/ =1/5 C/2 1@/3 95/ 9=C.78C?9.:@9CR S aeV[WU_ZV^_ceUVca^deU[eU[¡V^WVZe_^d_^V_ceUVU[^VaZeUVca^df C/ ./ 7/¢ >/21 95/240 95/240 8/2/536/ £13456 8/2/536/ /234¤333/451234150214//2/45432/5122/3¥ ?//2CR A4/5/C/2R <;C7C 7C@;. <@ ?A77@C¦§:C9.>9.=9:C9=C<¨8.9D<98@.© @C<8.9£<C?9.:@9C9C7;D9C.@D79.7;B.D9C.@DC=:=?.:7¥ 02/12/2026 Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 607325 TVR Construction Engineering LLC (714) 927 6664
4230 Michael St., Riverside, CA - 92507
02/12/2026
!"
!#
$%&'()*&+%,&
'()*&+%,-.&(
/(,&
'0),&
.%&.1+),%(+%)-,%23456789:43;<=649 8<>?@AB>49=3<>43@ABC=683>49=3<>4B8<D<378 =4EFGHIF:63;@J K=<>? 4;LM8=7>4LN:2<3=OPL38564A@L<Q8R:34;8<>?EFGHIFG:63;M@=87B M4DJ STUVWXYZUVY[\]
Z]^ UV_^`
VYab
S_ c\^dXVT^YVe\f^ g?8>hi98
VcZY]VSWXUV YZUj
#U^YX\`klZ ^\W`VY]ZX\VW_Ye\f^ l Y\WdXYS^ZWfUVY^UXm STUVWXYZUk_^ VcZY]VSWX ^YU WXZn^V`XZc\f j o p
j o p
#$
#[
b!"
!"#q r
stu#
"#v"
"
"
wZYXxy
#[
[#
" !"
!
wZYXyz
"!
"{
!"qr !"
!#
$b$""
[#r["!#[!"
amps Cycle 2 607325
(714) 927 6664
02/12/2026
!
"#!!#
!
$%
&
'
()
*
+
,
,)*(
,-
%.)&*
,&/&/
0-%
%
*
,,
&
12
&31245
&
67&,
)*
&
-
%12&312'
&(45
&
7
50
0-%
&
,
,
%
.)%
8 &
,
, (/0
,-
%
0
%&
497'
%
,:
%
2''&
0
,*
0-;)()
%, )(
,
(
&
%
0
%&
497+,<'
%
''&
-
&
(
,
)&
12=312/
&
/
%
&
+//&
)
.;)&+,<'
%
''&
-
00*
8 0)
,
&,
-
%
%
&
&
0
,*
0-
>>?!@ABC#DD>EBF
GHIJGJKBJ?LMAKAGNG>DO
KABA@ICJEJ
ADBENJ@K?
P>EEJPB
6$%
1
,,
&=:
&(
,
,
/&
<*
,(
+%
,*.
%
-
&,
+
+
.
+
Q-0
,+
'
%
/&R
&
S)
&
(
,+
04
'
/&
<*
,(
+
-
''
&
,7
$%
1
,,
&=:
&(
,8
&
,
%
8 0
*
0 .')*
&
+&)//0.
//&
)
'&12=312'
&(
-
%
%
/&R
' (/0
%
'00-
+T
,
-%
&
,8
&
,T
,
'&(
T
47'
,8
&
(
T
% /
'
%
,8
&
(
47
%
'&(
,)*(
-
%*
,
UVWXYZ[X\W]V^_\`abX]W_cXdX^Wc`]X`\\XeW`f[Xg
9$%
1
,,
&=:
&(/&8
,
,
&
,/
012=312)*
&
&-
%
%
/&R
/0
,/
'
hWW`\i`[_cWVjklZmnlZj_]dcWi`W]X\X_bXae]VoX\We[`^c`^aceX\_j_\`W_V^cg p^\[qaXWiX_]`aa]Xccr\_WsrcW`WXrt_e\VaXr\V^W`\WeX]cV^rWX[XeiV^X^qdfX]g u]Vb_aX`^VW`W_V^Vj`^s]XceV^cXc]X\X_bXaj]VdWiVcXj_]dcg v$%
1
,,
&=:
&(/&8
,
,/
012=312)*
&
&-
%
%
0
&
,8
,
%
%
0
-
8 0
*0
'&(
%
*
,,
&
'
0 ),
&
,
+'
%
&
&
S)
&
(
,
(/0
%
/
/
&-&Q
&.
/
&
/
%
&
hWW`\i`[_cWVjklZmnlZj_]dcWi`WsVq]\Vde`^se]Vb_aXa`cc_cW`^\XWVg p^\[qaXWiX^`dXVjWiXklZmnlZj_]dr`aa]Xccr\_WsrcW`WXrt_e\VaXr\V^W`\W eX]cV^r`^a`aXc\]_eW_V^VjWiXWX\i^_\`[`cc_cW`^\Xe]Vb_aXag w$%
1
,,
&=:
&((
,
'00-<)/
-
%/
012=312'
&(-%
%
x/&
,
&
%
/&R
hWW`\i`[_cWVjklZmnlZj_]dcWi`WsVq]\Vde`^sjV[[VyXazqey_Wigp^\[qaX WiX_]`aa]Xccr\_WsrcW`WXrt_e\VaXr\V^W`\WeX]cV^rWX[XeiV^X^qdfX]g u]Vb_aX`^VW`W_V^Vj`^s]XceV^cXc]X\X_bXaj]VdWiVcXj_]dcg G.B
G.B
!!
"#$ "%"
&'
()
!*(( ()*+,
-".%."/*+ 0*) .+(1
,
!
+) -2
3.)
+) *456#76- "%(
899:;<:=>?9@A@BC:D>E:9>@D?;@D?F=9GH9@>D;=FHG9<GD:IG@A9<G @BC:D>E:9>@DJ:HHBG??J;>9KJ?9:9GJE>L;@HGJ;@D9:;9LGB?@DJ9>IG:DHH:9G? ;@D9B:;9GHJIG9<@H;@D9:;9GHJ:DHBG?F=9?M
N
!!
"#$ "%,.+)*,)
!3.)
+) *456#76- "%(*+!+
/.) *) .+1*(%*!
+/..!-* )
899:;<:=>?9@AOPQRSPQA>BI?9<:9K@FB;@IL:DKDGC@9>:9GHT>9<MUD;=FHG9<G D:IG@A9<GOPQRSPQA>BIJ:HHBG??J;>9KJ?9:9GJE>L;@HGJ;@D9:;9LGB?@DJ T<G9<GBOPQ@BSPQJ>AL=:D?@B?LG;>A>;:9>@D?TGBGLB@V>HGH9@9<G@9<GBL:B9KJ :DH9<GBG?F=9?@AK@FBDGC@9>:9>@D?M8=?@:99:;<;@L>G?@A:DK>D9GBD:= H@;FIGD9?9<:9T>==GV>HGD;G9<G?:IG:DH?FWI>9T>9<W>HM 8;;@BH>DC9@X>9=GYZJ[G;9>@DY\\Y@A9<G]M[M^@HGJ>9>?:AG=@DKA@B:DKLGB?@D9@_D@T>DC=K :DHT>==>DC=KI:_GA:=?G@BAB:FHF=GD9?9:9GIGD9?9@:DKHGL:B9IGD9@A9<G]D>9GH[9:9G? `@VGBDIGD9MUJ9<GFDHGB?>CDGHJ<GBGWK;GB9>AK9<:9:==?9:9GIGD9?;@D9:>DGH<GBG>DJ:BG9BFG :DH;@BBG;99@9<GWG?9@AIK_D@T=GHCG:DHWG=>GAM
a
b
c
bd
b ef
g
hijkl
mn6 ol
6
i
p6 qrsk6
02/12/2026
Owner (714) 927 6664
G.B
G.B
!"#$$%&'()
(&*&+ (&#, -./012341 -./01234561.672/43.23/88./543 2/-4941 2/-49.1:: 8214:14561.1-8/91.143;23/44561.54:4561.
<=
>
?@@
>
=A
B
C@
DB
E
>D
F
C/@@
?B
G
>
@??H
< 2
D
@
>
5:
I
D
B
@JE
<
C5D=
A
?IB
C
>
=CK
H
DC
<
>
@
C
D
??K
C
DE
D
L M4;
C
D
?
IIDID
C@EC>
A
=
I
C=KD=
>
?@@
>
=A
B
C@
DB
KI
D@D
@?E
<D
BI
<
@?E
@@
DD
BI?K
@
K
<
K
B=
D@2<D
@@
DD
BI?K
@2<D
D
BI?K
@
B=
D@2<D
H
>
>
H
DC
<@
K;
C
D
?
D
>
B
G
<@
C;
C
D
?<D
?
D I
D
A
<D
B
C
K
N
E
D
H
?
B
CB
DBC
@
>
D
@
CO @
K@EC
>
D
>
;
C
D
?
IIDID
C@EC>
A
=
I
CDH
??=
I
C
K I
D@D
@?E
<D
BI
<
@?E
@@
DD
BI?K
D
K
<
K
B=
D@2<D
@@
DD
BI?K
@2<D
D
BI?K
@
B=
D@ 2<D
H
>
>
;
C
D
?
D
<D
?
D I
D
A
<D
B
>
=A
B
C@
DB>
?? BI?
CE=B
:
C
DC;DBPQQQRSTUVWXYVZ[\]Y[^_Y `\aY[_QYbbcUdefRUd
DC
H
>
DE
CO g3>
=A
B
@
DB>
??D
hE
D
>
>
?
<E
<
@
>
D
@
=
?EC
C
>
H
DCC EB
@D
??E=P
H
DC
??
Di
?EC
<E=
D
E=P<D
C
D
EC
D<D
?
C I
D
A
<D
B
j
C
>
??E=P D
I
>
??
D
@K
CC
?
DC
<?K 3>
D
@
B
D
?D
ID
@@
EIH>
>D
?
H
I?
CH>
>
D
H
B
C
D
D
C
:E=B
@
>
D
@
ID
D
hE
@DB
G
< D
D
<
>
D
BI
C=K:
Mgk3
?
gM5:2C
KI
DH>@
?
@
?
>
D
hE
D
C
D
@
>
??=
E=l
A
?I
?
K@
?
>
mM
C
BD
>
mM@D
>E >@
?ED
nop3>
I
?
K@DB
G
<@
?
B
@@
D
ID
D
=
C
Mq5:2MM 53J/.r1/;;284153J/.r1/;;28338172-239 53J/.r1/;;28:435.131 Gergis Bebawy Owner
02/12/2026
!
"
#$%&'()*+%,------------------------------------------------------------------------------------ .//+&00,------------------------------------------------------------------------------------- 12$2&,-----------3*45'/&,-------------6&7&48'9&#:%;&+,<=----------------------- .>2*9?'9;&8$7('(28&$;'@&9$%&/(*+%A$0*20.:28'+*B&/C((*>*$7AD%$E&28&('77'F*9?5&+2*(*>$2*'92'28& G'0.9?&7&05':92HI&@&7'4%&92.:28'+*2H<G.5I.=J
K=D2*0:9/&+02''/28$2&$>84&+0'9L&92*2HL(*+%F8'$447*&0('+$G'0.9?&7&05':92H I&@&7'4%&92.:28'+*2H>'92+$>2A$9/$04$+2'(28$24+'>&00A08$77>&+2*(H28$228&H$+&($%*7*$+ F*2828&+&M:*+&%&920'(28&G'0.9?&7&05':92H5'/&A58$42&+NJKOP<G'0.9?&7&05':92H C+/*9$9>&QRSPPRK=$9/T
N=68$2$774&+0'90L&92*2*&0L(*+%0$>2*9?'9;&8$7('(28&$;'@&9$%&/(*+%8$@&$9/F*77>'%47H F*2828&5':92H5'/&A$9/T
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
UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUVWXUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU YZ[\]^_`][^abcd`[\]^_`][^eYbfg\_]c^he UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU Yi_]he Yjf]khe TVR Construction Engineering LLC
4230 Michael St., Riverside
CA 92507 (714) 927 6664
Gergis Bebawy
02/12/2026 Owner
!"#$%&'()*+
,
-
.
/01
2 34056 7
0 8.2
09:;1<=> ?@A>BC-76@DE;F1GH6@DEIJK
LMNOPQRNMQPSNMTUVWSPNMOXPQWS YMZP[MSVPQ\VQPN]RSVPQU[MOVSWOX[R^ZUNMQS[^_RVW`abZPQSN[QU]cMNd efghijkielmfklim imnopkielmfklim
f mhn
qrstuvwxyz{| }~|
yx|
fmieijimhhe
mihklfeikflie
mihklimkielmfklei
f e flh
h oklien iiiiiiii
efgh ¡¢£¤¥¦§¡¨©£ª
«¬®¯¢°¤¥±¡ª§¤°±¥°ikfnhkoml
¡¨©£ª²ij³±ª´£ª
iji e
e
i l n iel g hµh im
kfn jkflie
ln im il iomnimhfkf
lilf
iomn
mflh ijf minn
fgioel
hfmehjkf l¶
ie
lfµ ilhm
lilf
h oklien
ehl fhn
f
jimhh
n
nnnnnnn
·¸¹º»¼½¾¿x|}
³ÀÁ¬ÃÄÅÆÂ¬ÇÁÄÈÉ¥ ÊųËÌÍÎÏÁÐÄÆÇÁÈѯÁÇÐÅÑÈÒÑÇÄÊÓÉ ÃÔ¬ÊÒÃÄÈÇÊÑÃÄÐÑÈÒÐÕÖÃÄÈÇÊÑÃÄÐÆ¬ÉÄÅÁÈ®×ÄÊØ È¥¬ÒÊÑÂÓÉÁÈÑìÒÄÊÑÐÁǬÒÃÄÈÐÇÊÕÃÁÄÈà ÇÊÑÃÐÄÊ¬ÐÆÄÈÒÇ À¬ÁÈÉÄÊÅÑÇÁÄÈìÇÁÄÈà ÇÑÁ¬Ò ÙÚÛ¥ªÜ Í¯Ý «Ñ²¤À¬ÛÄÆ¬ÂÑÈÒÃÇ «ÎÞ¡°ÛÜÍßÎݲÃÄÈÇÊÑÃÄÐÑÈÒÐÕÖÃÄÈÇÊÑÃÄÐÆ¬ÉÄÅÁÈ®×ÄÊØ È¥¬ÒÊÑÂÓÉÁÈÑìÒÄÊÑÐÁǬÒÃÄÈÐÇÊÕÃÁÄÈà ÇÊÑÃÐÄàÉÕÊÈÁÐÀ׬ØÂÓÑÐǬŬÈÇ×ÁÀÊ¬ÐÆÃÇÄÀ¬×Ñ®¬ÐÆÑÁÒ¬ÃÀ ÅÆÂÄÓ¬ÒÕÊÁÈ®ÇÀ¬ÆÊÃÒÁȮ׬Øà¡° ¬ÆÑÊÇŬÈÄÉ¢ÑÖÄÊ«±¢²Ê¬®ÕÂÑÇÁÄÈÐÑÇ ÙÚÛ¥ªÜÝ «Ñ²Í ÁʬáÕÁÃÄÈÇÊÑÃÄÐ ÕÖÅÁÇ׬ØÂÓÑÃÄÆÓ ÉÑÂÆÓÊÄÂÐÇÄÀ¬¥ ÒÊÑ®¬ÈÃÓÄÈÇÊÑÃÁÈ®ÉÄÊ ÉÁÈÑà ®ÇÀ¬ÃÄÈÐÇÊÕÃÁÄÈÆÊâ¬ÃÇ¯Ñ ÄÅÆÑÈÁ¬ÒÖÓÑÐÁ®È¬Òà°ÇѬŬÈÇÄÉÛ ÅÆÂÁÑÈìàÁÈÒÃÑÇÈ®ÀÑ ¬ÆÑÓÊÄÂÐÑʬÃÄ ¬ÇÑÈÒÃÄÅÆÂ¬ÇÑÈÒÇÀѬÃÀÂÖÄʬ ÄÊŬÃÀÑÈÁÀÑÐÖ¬ÈÆÑÁÒÈÄǬРÇÀÑÈ ¬ÆÊĬÑÔÁÐÌ©ÑÃÄÈÆÊ¬ÔÑÁÂÈ®×ѬÊÇÉÄÊÇÀ¬×ÄÊØÆ¬ÉÄŬұ¢ÑÈÒɬ ÊÑÂÃÄÈÇÊÑÃÁȮѬÈÃÁÐÊÃÁÔÈ®ÇÀÁÐÈÉÄÊÅÑÇÁÄÈʬÔÁ×ÇÀ ÁÈÉÄÊÅÑÇÁÄÈ Ò¬ ÊÅÁÈÇÀÑ¬ÅÆÂÄÓ¬ÐÀÑÔ¬ÊÃÁÔÒ®ÑÓʬáÕÁÒ×Ñ®¬ÐÈÒÉÊÁÈ®¬ÖÈÉÁÇÐ ãäåæçèéäêëìíîïðìñìíï ³¬¬ÐÇÁÅѬÀÑÁÐ×ÂÇÑØ¬ È Ô¬Ê®ÄÉÝ ÅÁÈÕǬÐÄÃÅÆÂ¬ÇÀÁÐÃĬÇÁÄȯÃÂÕÒÁÈ®ÇŬÉÄʬÔÁ×È®ÐÇÊÕÃÁÄÈЯ¬ÑÊÃÀÁÈ®¬òÁÐÇÈ®ÒÑÇÐÄÕÊìЯ®ÑÇÀ¬ÊÁÈ®ÑÒÅÑÁÈÇÑ ®ÇÀ¬ÒÑÇÈ¬Ò ¯ÑÈ ÃÄÅÆÂ¬ÇÁÈ®ÑÒʬÔÁ×È®ÇÀ¬ÃĬÇÁÄÈÉÁÈÄÊÅÑÇÁÄÈÉÓÄÕÀÑÔ¬ ÑÈÓÃÄÅŬÈÇÐʬ®ÑÒÁÈ®ÇÀ¬Ð ÇÁÅѬÐÄÊÑÈÓÄÇÀ¬ÊÑÐÆ¬ÃÇÄÉÀÁÐÃĬÇÁÄȯÃÂÕÒÁÈ®ÐÕ ¬ÐÇÁÄÈÉʬÒÕÃÁÈ®ÇÀÁÐÖÕÊҬȯРÒÇÀ¬ÅÇÄÀ¬ÒÅÁÈÁÐÇÊÑį³Ñ®¬ÑÈÒËÄÕÊÁÔÐÄȯ¡° ¬ÆÑÊÇŬÈÄÉ¢ÑÖÄʯª ŰÍÝÞÙ¯ ÛÄÈÐÇÁÕÄÈÔ¬ÈÕ¯³ ³ÑÐÀÁÈ®ÇÄ¯Û ÙÞß «ÄԬʲ
!
!
!
"
!
!
#
$
%
&'
(
)
*+!+
,
-%-
-
!
!
!
!
!
-%-
./
!0
1
2/!0
!0
-
!
3
456 783
9
!
:
9!
;<
=6;<
>4
=
?<@5
=6>@"
=4A@";?B=
CDEFG !
-
5
-
!H!I
HJ
H
K
!
!
" -
!
!LMN
O2LK
O!
H/!H!"/ NP2QORN20HSQ
!
!
--
%
=
4/2
O!
T
/
K
2U
MO2V
R2TMKS0ONQ/T
M0-O
2
O!
2!M
WV0X
H
YTMKS0ONQ/T2SU
B
:
Z
!
W![\02K]M ^OQ0MU
-#
9 !
B
:
=
;
$_`3 8 a`#` 8
93`9b9 3bc`:9
8B
b33ba39d
e
!
-
!
!
!
f !
!
V HLg0
0
gR
0RH
Q
!KgTPHhKQ]
[!
i!
;!
-=
$_`3 8 a`#` 8
93`9 9
_
j `!
!
!
!
!
!
-
I
!
![!
i!
;!
-=
!`k b
3`d93l
`k b 398`k:9 b
9d` :`
a 9B3`
_`$:8B 89:
8 9b mn9 omnpq`9#br`
s `d`
dso
B#tu q` bv39 b3bw
B# b 39 b3b c:b3 3d 9:3b
` Bb =
` b
? b8:`
<9
` b xyz{b8:`4
b8_`B `
9 `
b`=
!"#$%!"&'#($)*+(,$$%-'$
./
0$&"/$*" #(#'$$)*+(,$$
#'$ /
-"0$&1
234& &#$
!$(/5/"6$+7
8$93 /$7:;<; =$#$/)
"# (
7
>
?@
A
!"#$-'$/$./
0$&"
#/"
0"/$*" 1
BCDEFEGHIJKL(
#/"!#(/M/
0$N$
$. #2#"#$)$
#
>
OPQ
RP
TR
UV
OPQ ?S
W
N"&$8"#$7
L+"&& . !"# (
7 N X6$/# &$)$
#="#$7
Y/(3*Z[$/ (7
!/$"&$="#$\&]7
^_
`
W
W
a
V VbQa
cU
VW
QaW
Td'(3/+,/"#$&
VQ
dPQ
ac
WWd
a
P
c
Ud
QQPQcA
V
beeeeeeeee
V
beeeeeeeee
!"#$-'$/$./
0$&"
#/"
0"/$*" 1
!"#$%!"&'#($)*+(,$$%-'$
./
0$&"/$*" #(#'$$)*+(,$$
#'$ /
-"0$&1
f
8$6 &$./
0$4$
$. #&#"#$)$
#&)3$&34) ##$3/
0#'$*/(0/$&&(.-(/g ."
!'"
0$
"
,/"#$(.*",.(/"
,-(/g!+"&& . !"# (
&)"$1
N"&$8"#$7
234& &#$
!$(/5/"6$+7
8$93 /$7:;<;
h =$#$/)
"# (
7
!/$"&$="#$\&]7
fW
L+"&& . !"# (
7 N X6$/# &$)$
#="#$7
Y/(3*Z[$/ (7
O
VP
OPQ
Ri
j
O
VP
TBD
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
ADDENDUM No. 1
CIP 626 – COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT 602732-25 Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 DATE: February 2, 2026
TO: All Prospective Bidders
1. Refer to CONTRACT DOCUMENTS – Recital 17K Supplemental Insurance Requirements
Replace Exhibit 1 A – Los Angeles County Development Authority (LACDA) with Appendix “A”, Supplemental Insurance Requirments
2. Refer to Appendix D – Federal Labor Standards Compliance Forms and Instructions
Replace Exhibit 17 Federal Wage Decision with Appendix “B”, Current Federal Wage Decision
ADDENDUM ISSUED BY: _____________________________________ Saad Malim, City Engineer
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
ACKNOWLEDGEMENT OF ADDENDUM No. 1
CIP 626 – COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT 602732-25 Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 Complete and sign this acknowledgement form. Enclose the original copy of the acknowledgement in your bid. Failure to do so may result in disqualification of your firm’s bid.
The undersigned acknowledges receipt of Addendum No. 1 dated February 2, 2026.
ATTEST: _____________________________________
Principal: _____________________________________
Address: _____________________________________
By: _____________________________________
Title: _____________________________________
TVR Construction Engineering LLC
Gergis Bebawy
4230 Michael St., Riverside, CA - 92507
Gergis Bebawy
Owner
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix “A” – Supplemental Insurance Requirements
EXHIBIT 1 A - LOS ANGELES COMMUNITY DEVELOPMENT AUTHORITY (LACDA)
CITY CONTRACTOR/SUB-CONTRACTOR REQUIREMENTS
The City shall require in its agreement with its Contractor(s) for activities related to this Agreement, under the Contractor(s) own policies, the Contractor(s) shall name the LACDA and the County of Los Angeles as additional insureds on the Contractor(s) general liability policy and shall include primary and non-contributory coverage and a waiver of subrogation. A waiver of subrogation shall be required for the auto liability and workers compensation policies. The City shall provide the LACDA with each Contractor(s) separate evidence of insurance coverage for activities related to this Agreement or upon request.
The City shall obtain the LACDA’s prior review and approval of any Contractor/Sub-Contractor request for modification of the required insurance. The City shall be responsible for verifying that each Contractor/Sub-Contractor complies with the required insurance provisions herein.
CITY AND/OR CONTRACTOR/SUBCONTRACTOR REQUIREMENTS (CONSTRUCTION):
A
GENERAL LIABILITY: (providing scope of coverage equivalent to ISO policy form CG 00 01), naming the LACDA, its Special Districts, Elected Officials, Officers, Agents, Employees and Volunteers (collectively "LACDA and its Agents") as additional insureds with primary and non-contributory coverage and a waiver of subrogation naming the LACDA and the County is required.
General Aggregate $2 Million
Products/Completed/On-Going Operations Aggregate $2 Million Personal and Advertising Injury $1 Million
Each Occurrence $1 Million
B
COMMERCIAL AUTOMOBILE INSURANCE: Shall include coverage of all “owned”, “hired” and “non-owned” vehicles, or coverage for “any auto”. Shall include a waiver of subrogation in favor of the LACDA.
Bodily injury and property damage, in combined
or equivalent split limits, for each single accident $1 Million C
WORKERS’ COMPENSATION AND EMPLOYER’S LIABILITY: As required by the Labor Code of the State of California. Must include a waiver of subrogation in favor of the LACDA. In all cases, insurance shall include employer’s liability coverage with limits of not less than indicated.
Employers’ Liability coverage with limits of not less than $1 Million D
POLLUTION LIABILITY INSURANCE AND/OR ASBESTOS POLLUTION LIABILITY AND/OR ERRORS & OMISSIONS: applicable to the work being performed including coverage for bodily injury, personal injury, death, property damages, and environmental damage. The LACDA and the County shall be covered as additional insureds on the pollution liability insurance policy.
Said policy shall include a $2 million-dollar general aggregate and $1 million dollars each occurrence limit and shall include but not be limited to coverage for any and all remediation costs, including, but not limited to, Brownfield restoration and clean-up
costs, and coverage for the removal, repair, handling, and disposal of asbestos and/or lead containing materials where applicable. The LACDA and the County shall be covered as additional insureds on the pollution liability insurance policy. If the general liability insurance policy and/or the pollution liability insurance policy is written on a claims-made form, then said policy or policies shall also comply with all of the following requirements:
a. The retroactive date must be shown on the policy and must be before the date of this Agreement or the beginning of the work or services that are the subject of this Agreement;
b. Insurance must be maintained, and evidence of insurance must be provided for the duration of this Agreement or for five (5) years after completion of the work or services that are the subject of this Agreement, whichever is greater; c. If coverage is canceled or non-renewed, and not replaced with another claimsmade policy form with a retroactive date prior to the effective date of this Agreement, then the Contractor(s) must purchase an extended period coverage for a minimum of five (5) years after completion of work or services that are the subject of this Agreement;
d. A copy of the claims reporting requirements must be submitted to the LACDA for review; and
e. If the work or services that are the subject of this Agreement involve lead based paint or asbestos identification/remediation, then the Contractor’s pollution liability shall not contain any lead-based paint or asbestos exclusions. f. If the services involve mold identification/remediation, the Contractor’s pollution liability shall not contain a mold exclusion and definition of “pollution” shall include microbial matter including mold.
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix “B” – Current Federal Wage Decision
"General Decision Number: CA20260022 01/30/2026
Superseded General Decision Number: CA20250022
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
County: Los Angeles County in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication Date
0 01/02/2026
1 01/23/2026
2 01/30/2026
ASBE0005-002 09/01/2024
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
protective coverings,
coatings, and finishes to all
types of mechanical systems).....$ 56.32 26.52
Fire Stop Technician
(Application of Firestopping
Materials for wall openings
and penetrations in walls,
floors, ceilings and curtain
walls)...........................$ 39.94 20.65
---------------------------------------------------------------- ASBE0005-004 07/04/2022
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)....$ 23.52 13.37
---------------------------------------------------------------- BOIL0092-003 01/01/2024
Rates Fringes
BOILERMAKER......................$ 51.98 42.11
---------------------------------------------------------------- * BRCA0004-007 05/01/2024
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 45.53 20.29
*The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the
standard San Bernardino/Riverside County hourly wage rate ---------------------------------------------------------------- BRCA0018-004 06/01/2024
Rates Fringes
MARBLE FINISHER..................$ 43.38 15.36
TILE FINISHER....................$ 37.96 13.77
TILE LAYER.......................$ 51.82 19.32
---------------------------------------------------------------- BRCA0018-010 09/01/2024
Rates Fringes
TERRAZZO FINISHER................$ 42.11 14.67
TERRAZZO WORKER/SETTER...........$ 49.62 15.26
---------------------------------------------------------------- CARP0213-001 07/01/2025
Rates Fringes
CARPENTER
(1) Carpenter, Cabinet
Installer, Insulation
Installer, Hardwood Floor
Worker and acoustical
installer...................$ 52.24 26.18
(2) Millwright..............$ 52.24 26.68
(3) Piledrivermen/Derrick
Bargeman, Bridge or Dock
Carpenter, Heavy Framer,
Rock Bargeman or Scowman,
Rockslinger, Shingler
(Commercial)................$ 52.37 26.18
(4) Pneumatic Nailer,
Power Stapler...............$ 52.37 26.18
(5) Sawfiler...............$ 52.34 26.18
(6) Scaffold Builder.......$ 45.37 25.43
(7) Table Power Saw
Operator....................$ 52.34 26.18
FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a
substitute for back forms (which work is performed by
piledrivers): $0.13 per hour additional.
---------------------------------------------------------------- CARP0213-002 07/01/2025
Rates Fringes
Diver
(1) Wet.....................$ 901.92 26.18
(2) Standby.................$ 450.96 26.18
(3) Tender..................$ 442.96 26.18
(4) Assistant Tender........$ 418.96 26.18
Amounts in ""Rates' column are per day
---------------------------------------------------------------- CARP0213-004 07/01/2025
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 52.24 26.18
STOCKER/SCRAPPER............$ 21.45 11.27
---------------------------------------------------------------- CARP0721-001 07/01/2025
Rates Fringes
Modular Furniture Installer......$ 25.00 13.06
---------------------------------------------------------------- * ELEC0011-004 01/27/2026
Rates Fringes
ELECTRICIAN (INSIDE
ELECTRICAL WORK)
Journeyman Electrician......$ 65.00 3%+35.62
ELECTRICIAN (INTELLIGENT
TRANSPORTATION SYSTEMS Street
Lighting, Traffic Signals,
CCTV,and Underground Systems)
Journeyman Transportation
Electrician.................$ 64.80 3%+35.82
Technician..................$ 48.60 3%+35.82
FOOT NOTE:
CABLE SPLICER & INSTRUMENT PERSON: Recieve 5% additional per hour above Journeyman Electrician basic hourly rate.
TUNNEL WORK: 10% additional per hour.
SCOPE OF WORK - TRANSPORTATION SYSTEMS
ELECTRICIAN:
Installation of street lights and traffic signals,including electrical circuitry, programmable controllers,
pedestal-mounted electrical meter enclosures and laying of pre-assembled multi-conductor cable in ducts, layout of electrical systems and communication installation,
including proper position of trench depths and radius at duct banks, location for man
holes, pull boxes, street lights and traffic signals.
Installation of underground ducts for electrical,telephone, cable television and communication systems.
Pulling,termination and
splicing of traffic signal and street lighting conductors and electrical systems including interconnect,detector loop, fiber optic cable and video/cable.
TECHNICIAN:
Distribution of material at job site, manual excavation and backfill, installation of system conduits and raceways for electrical, telephone, cable television and communication systems. Pulling, terminating and splicing of traffic signal and street lighting conductors and electrical systems
including interconnect, detector loop, fiber optic cable and video/data.
---------------------------------------------------------------- * ELEC0011-007 01/01/2024
COMMUNICATIONS & SYSTEMS WORK (excludes any work on Intelligent Transportation Systems or CCTV highway systems)
Rates Fringes
Communications System
Installer...................$ 46.47 3%+17.08
SCOPE OF WORK The work covered shall include the
installation, testing, service and maintenance, of the
following systems that utilize the transmission and/or
transference of voice, sound, vision and digital for
commercial, education, security and entertainment purposes for TV monitoring and surveillance, background foreground music, intercom and telephone interconnect, inventory
control systems, microwave transmission, multi-media,
multiplex, nurse call system, radio page, school intercom and sound, burglar alarms and low voltage master clock
systems.
A. Communication systems that transmit or receive information and/or control systems that are intrinsic to the above
listed systems SCADA (Supervisory control/data acquisition PCM (Pulse code modulation) Inventory control systems
Digital data systems Broadband & baseband and carriers
Point of sale systems VSAT data systems Data communication systems RF and remote control systems Fiber optic data
systems
B. Sound and Voice Transmission/Transference Systems
Background-Foreground Music Intercom and Telephone
Interconnect Systems Sound and Musical Entertainment
Systems Nurse Call Systems Radio Page Systems School
Intercom and Sound Systems Burglar Alarm Systems
Low-Voltage Master Clock Systems Multi-Media/Multiplex
Systems Telephone Systems RF Systems and Antennas and Wave Guide
C. *Fire Alarm Systems-installation, wire pulling and
testing.
D. Television and Video Systems Television Monitoring and Surveillance Systems Video Security Systems Video
Entertainment Systems Video Educational Systems CATV and CCTV
E. Security Systems, Perimeter Security Systems, Vibration Sensor Systems
Sonar/Infrared Monitoring Equipment, Access Control Systems, Card Access Systems
*Fire Alarm Systems
1. Fire Alarms-In Raceways: Wire and cable pulling in
raceways performed at the current electrician wage rate and fringe benefits.
2. Fire Alarms-Open Wire Systems: installed by the Technician. ---------------------------------------------------------------- ELEC1245-001 01/01/2025
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 70.16 24.71
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 53.30 22.26
(3) Groundman...............$ 40.76 21.76
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0018-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC................$ 69.43 38.435+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0012-004 08/01/2025
Rates Fringes
OPERATOR: Power Equipment
(DREDGING)
(1) Leverman................$ 67.90 40.95
(2) Dredge dozer............$ 61.93 40.95
(3) Deckmate................$ 61.82 40.95
(4) Winch operator (stern
winch on dredge)............$ 61.27 40.95
(5) Fireman-Oiler,
Deckhand, Bargeman,
Leveehand...................$ 60.73 40.95
(6) Barge Mate..............$ 61.34 40.95
---------------------------------------------------------------- ENGI0012-024 07/01/2025
Rates Fringes
OPERATOR: Power Equipment
(All Other Work)
GROUP 1....................$ 63.40 33.20
GROUP 2....................$ 64.18 33.20
GROUP 3....................$ 64.67 33.20
GROUP 4....................$ 65.96 33.20
GROUP 6....................$ 66.18 33.20
GROUP 8....................$ 66.29 33.20
GROUP 10....................$ 66.41 33.20
GROUP 12....................$ 66.58 33.20
GROUP 13....................$ 66.68 33.20
GROUP 14....................$ 66.71 33.20
GROUP 15....................$ 66.79 33.20
GROUP 16....................$ 66.91 33.20
GROUP 17....................$ 67.08 33.20
GROUP 18....................$ 67.18 33.20
GROUP 19....................$ 67.29 33.20
GROUP 20....................$ 67.41 33.20
GROUP 21....................$ 67.58 33.20
GROUP 22....................$ 67.68 33.20
GROUP 23....................$ 67.79 33.20
GROUP 24....................$ 67.91 33.20
GROUP 25....................$ 68.08 33.20
OPERATOR: Power Equipment
(Cranes, Piledriving &
Hoisting)
GROUP 1....................$ 64.75 33.20
GROUP 2....................$ 65.53 33.20
GROUP 3....................$ 65.82 33.20
GROUP 4....................$ 65.96 33.20
GROUP 5....................$ 66.18 33.20
GROUP 6....................$ 66.29 33.20
GROUP 7....................$ 66.41 33.20
GROUP 8....................$ 66.58 33.20
GROUP 9....................$ 66.75 33.20
GROUP 10....................$ 67.75 33.20
GROUP 11....................$ 68.75 33.20
GROUP 12....................$ 69.75 33.20
GROUP 13....................$ 70.75 33.20
OPERATOR: Power Equipment
(Tunnel Work)
GROUP 1....................$ 65.25 33.20
GROUP 2....................$ 66.03 33.20
GROUP 3....................$ 66.32 33.20
GROUP 4....................$ 66.46 33.20
GROUP 5....................$ 66.68 33.20
GROUP 6....................$ 66.79 33.20
GROUP 7....................$ 66.91 33.20
PREMIUM PAY:
$10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval
Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp
Pendleton
Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator
operator-inside; Engineer Oiler; Forklift operator
(includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank
operator);Coil Tubing Rig Operator, Concrete mixer
operator-skip type; Conveyor operator; Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or
concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd. without
attachment); Tar pot fireman; Temporary heating plant
operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable);Direct Push
Operator (Geoprobe or similar types) Drilling machine
operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -
drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling
(above ground tunnel); Power concrete curing machine
operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck
GROUP 6: Articulating material hauler; Asphalt plant
engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator,
bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45'
maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track
maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete,
Clary-Johnson-Bidwell or similar); Micro tunnel system
(below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator
(crawler and wheel type, over 3/4 yd. and up to and
including 1-1/2 yds.); Slip form pump operator (power
driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and
including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator;
Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar types; Cable Bundling Machine Operator
(excluding handheld); Cable Trenching Machine Operator
(Spider Plow or similar types) Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled);
Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar
type); Pumpcrete gun operator; RCM Cementing Unit Operator, Rail/Switch Grinder Operator (Harsco or similar types)
Rock Drill or similar types; Rotary drill operator
(excluding caisson type); Rubber-tired earth-moving
equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck);
Rubber-tired earth-moving equipment operator (multiple
engine up to and including 25 yds. struck); Rubber-tired scraper operator (self-loading paddle wheel type-John
Deere, 1040 and similar single unit); Self- propelled curb and gutter machine operator; Shuttle buggy; Skiploader
operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type
larger than D-5 - 100 flywheel h.p. and over, or
similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity,
manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull
(compaction) operator
GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar
types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail
locomotive operator (diesel, gas or electric); Motor
patrol-blade operator (single engine); Multiple engine
tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment)
GROUP 12: Auto grader operator; Automatic slip form operator;
Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or
similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment operator
operating equipment with push-pull system (single engine, up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.)
GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple
engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system
(multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, up to and including 25 yds. struck)
GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any
combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment
operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction
units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating in tandem
(scrapers, belly dumps, and similar types in any
combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)
GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, up to and including 25 yds. struck)
GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, Caterpillar, Euclid, Athey Wagon and
similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck)
GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar type, over 50 cu. yds. struck); Spyder Excavator Operator, with all attachments
CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross carrier
operator (jobsite)
GROUP 4: Bridge-type unloader and turntable operator;
Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile
operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar
gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane
repair; Tugger hoist operator (3 drum)
GROUP 8: Crane operator (up to and including 25 ton
capacity); Crawler transporter operator; Derrick barge
operator (up to and including 25 ton capacity); Hoist
operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to and
including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.);
GROUP 11: Crane operator (over 100 tons and up to and
including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) ; Tower crane operator and tower gantry
GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and
including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)
TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. without
attachment)
GROUP 2: Power-driven jumbo form setter operator
GROUP 3: Dinkey locomotive or motorperson (up to and
including 10 tons)
GROUP 4: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons)
GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading
shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator
ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below:
That area within the following Boundary: Begin in San
Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 6, T25S, R42E, MDM. Continue W along the Inyo and San
Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.
Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.
Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.
Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM.
Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM
$1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below:
That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM.
Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow
the west side of R30W, SBM to the SW corner of T9N, R30W, SBM.
Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W.
Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM.
$2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below:
That area within the following Boundary: Begin at the
intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM.
Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM.
Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM.
Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM.
REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE
---------------------------------------------------------------- IRON0433-006 01/01/2025
Rates Fringes
IRONWORKER
Fence Erector...............$ 45.78 26.51
Ornamental, Reinforcing
and Structural..............$ 50.70 35.15
PREMIUM PAY:
$9.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0300-001 11/01/2025
Rates Fringes
Brick Tender.....................$ 42.60 22.13
---------------------------------------------------------------- LABO0300-003 07/01/2025
Rates Fringes
LABORER (TUNNEL)
GROUP 1.....................$ 53.60 25.74
GROUP 2.....................$ 53.92 25.74
GROUP 3.....................$ 54.38 25.74
GROUP 4.....................$ 55.07 25.74
LABORER
GROUP 1.....................$ 46.48 25.95
GROUP 2.....................$ 47.03 25.95
GROUP 3.....................$ 47.58 25.95
GROUP 4.....................$ 49.13 25.95
GROUP 5.....................$ 49.48 25.95
LABORER CLASSIFICATIONS
GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike-off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or
water pipeline laborer; Laborer, asphalt-rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator
(walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete; Railroad maintenance, repair track person and road beds; Streetcar and railroad construction track laborers; Rigging and signaling; Scaler; Slip form raiser; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations
GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and
installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curbs, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine
grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water
pipeline wrapper - pot tender and form person; Guinea
chaser; Headerboard person - asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer(lead); Tank scaler and cleaner; Tree climber, faller, chain saw
operator, Pittsburgh chipper and similar type brush
shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay-kold,
creosote, lime caustic and similar type materials
(""applying"" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating
machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Wacker and similar type; Trenching machine, hand-propelled
GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Head rock
slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize
concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster
(nozzle person), water blasting, Porta Shot-Blast
GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person; Dump
person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.) GROUP 2: Chucktender, cabletender; Loading and unloading agitator cars;; Vibrator person, jack hammer, pneumatic tools (except driller); Bull gang mucker, track person; Concrete crew, including rodder and spreader
GROUP 3: Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; Jumbo person; Kemper and other pneumatic concrete placer operator; Miner, tunnel (hand or machine); Nozzle person; Operating of
troweling and/or grouting machines; Powder person (primer house); Primer person; Sandblaster; Shotcrete person; Steel form raiser and setter; Timber person, retimber person, wood or steel; Tunnel Concrete finisher
GROUP 4: Diamond driller; Sandblaster; Shaft and raise work ---------------------------------------------------------------- LABO0300-005 07/01/2025
Rates Fringes
Asbestos Removal Laborer.........$ 46.48 25.93
SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and
disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaffolding,
fabrication of temporary wooden barriers and assembly of decontamination stations.
---------------------------------------------------------------- LABO0345-001 07/01/2025
Rates Fringes
LABORER (GUNITE)
GROUP 1.....................$ 55.88 23.77
GROUP 2.....................$ 54.93 23.77
GROUP 3.....................$ 51.39 23.77
FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a
Bosn'n's Chair or suspended from a rope or cable shall
receive 40 cents per hour above the foregoing applicable classification rates. Workers doing gunite and/or
shotcrete work in a tunnel shall receive 35 cents per hour above the foregoing applicable classification rates, paid on a portal-to-portal basis. Any work performed on, in or above any smoke stack, silo, storage elevator or similar type of structure, when such structure is in excess of
75'-0"" above base level and which work must be performed in whole or in part more than 75'-0"" above base level, that work performed above the 75'-0"" level shall be compensated for at 35 cents per hour above the applicable
classification wage rate.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Rodmen, Nozzlemen
GROUP 2: Gunmen
GROUP 3: Reboundmen
---------------------------------------------------------------- LABO1184-001 07/01/2025
Rates Fringes
Laborers: (HORIZONTAL
DIRECTIONAL DRILLING)
(1) Drilling Crew Laborer...$ 47.94 20.86
(2) Vehicle Operator/Hauler.$ 48.11 20.86
(3) Horizontal Directional
Drill Operator..............$ 49.96 20.86
(4) Electronic Tracking
Locator.....................$ 51.96 20.86
Laborers: (STRIPING/SLURRY
SEAL)
GROUP 1.....................$ 49.30 23.97
GROUP 2.....................$ 50.60 23.97
GROUP 3.....................$ 52.61 23.97
GROUP 4.....................$ 54.35 23.97
LABORERS - STRIPING CLASSIFICATIONS
GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician
GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and
preparation of surface for coatings. Traffic control
person: controlling and directing traffic through both
conventional and moving lane closures; operation of all related machinery and equipment
GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This
category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the
application process. Traffic protective delineating system installer: removes, relocates, installs, permanently
affixed roadside and parking delineation barricades,
fencing, cable anchor, guard rail, reference signs,
monument markers; operation of all related machinery and equipment; power broom sweeper
GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all
related machinery and equipment
---------------------------------------------------------------- LABO1414-001 08/06/2025
Rates Fringes
LABORER
PLASTER CLEAN-UP LABORER....$ 46.17 25.97
PLASTER TENDER..............$ 48.72 25.97
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0036-001 07/01/2023
Rates Fringes
Painters: (Including Lead
Abatement)
(1) Repaint (excludes San
Diego County)...............$ 29.59 17.12
(2) All Other Work..........$ 38.52 18.64
REPAINT of any previously painted structure. Exceptions:
work involving the aerospace industry, breweries,
commercial recreational facilities, hotels which operate commercial establishments as part of hotel service, and sports facilities.
---------------------------------------------------------------- PAIN0036-006 09/01/2024
Rates Fringes
DRYWALL FINISHER/TAPER
Antelope Valley North of
the following Boundary:
Kern County Line to Hwy.
#5, South on Hwy. #5 to
Hwy. N2, East on N2 to
Palmdale Blvd., to Hwy.
#14, South to Hwy. #18,
East to Hwy. #395...........$ 45.20 26.82
Remainder of Los Angeles
County......................$ 49.33 26.82
---------------------------------------------------------------- PAIN0036-015 01/01/2025
Rates Fringes
GLAZIER..........................$ 53.05 30.64
FOOTNOTE: Additional $1.25 per hour for work in a condor, from the third (3rd) floor and up Additional $1.25 per
hour for work on the outside of the building from a swing stage or any suspended contrivance, from the ground up
---------------------------------------------------------------- PAIN1247-002 01/01/2025
Rates Fringes
SOFT FLOOR LAYER.................$ 45.15 19.43
---------------------------------------------------------------- PLAS0200-009 08/03/2022
Rates Fringes
PLASTERER........................$ 47.37 19.64
---------------------------------------------------------------- PLAS0500-002 07/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 47.70 27.07
---------------------------------------------------------------- PLUM0016-001 09/01/2025
Rates Fringes
PLUMBER/PIPEFITTER
Work ONLY on new additions
and remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space.................$ 59.85 25.83
Work ONLY on strip malls,
light commercial, tenant
improvement and remodel
work........................$ 44.29 24.16
All other work except work
on new additions and
remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space and work on
strip malls, light
commercial, tenant
improvement and remodel
work........................$ 61.73 26.81
---------------------------------------------------------------- PLUM0345-001 09/01/2025
Rates Fringes
PLUMBER
Landscape/Irrigation Fitter.$ 44.75 26.20
Sewer & Storm Drain Work....$ 48.84 23.58
---------------------------------------------------------------- ROOF0036-002 08/01/2025
Rates Fringes
ROOFER...........................$ 52.63 20.73
FOOTNOTE: Pitch premium: Work on which employees are exposed to pitch fumes or required to handle pitch, pitch base or pitch impregnated products, or any material containing coal tar pitch, the entire roofing crew shall receive $1.75 per hour ""pitch premium"" pay.
---------------------------------------------------------------- * SFCA0669-013 01/01/2026
DOES NOT INCLUDE THE CITY OF POMONA, CATALINA ISLAND, AND THAT PART OF LOS ANGELES COUNTY WITHIN 25 MILES OF THE CITY LIMITS OF LOS ANGELES:
Rates Fringes
SPRINKLER FITTER.................$ 50.79 29.80
---------------------------------------------------------------- SFCA0709-005 09/01/2025
THE CITY OF POMOMA, CATALINA ISLAND, AND THAT PART OF LOS
ANGELES COUNTY WITHIN 25 MILES OF THE CITY LIMITS OF LOS ANGELES:
Rates Fringes
SPRINKLER FITTER (Fire)..........$ 58.60 33.65
---------------------------------------------------------------- SHEE0105-002 01/01/2025
LOS ANGELES (South of a straight line between Gorman and Big Pines including Catalina Island)
Rates Fringes
SHEET METAL WORKER
(1) Light Commercial: Work
on general sheet metal and
heating and AC up to 4000
sq ft.......................$ 35.57 10.63
(2) Modernization :
Excluding New Construction
- Under 5000 sq. ft. Does
not include modification,
upgrades, energy
management, or
conservation improvements
of central heating and AC
equpment....................$ 34.17 10.86
---------------------------------------------------------------- SHEE0105-003 01/01/2025
LOS ANGELES (South of a straight line drawn between Gorman and Big Pines)and Catalina Island, INYO, KERN (Northeast part, East of Hwy 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES Rates Fringes
SHEET METAL WORKER
(1) Commercial - New
Construction and Remodel
work........................$ 59.31 30.43
(2) Industrial work
including air pollution
control systems, noise
abatement, hand rails,
guard rails, excluding
aritechtural sheet metal
work, excluding A-C,
heating, ventilating
systems for human comfort...$ 56.95 30.04
---------------------------------------------------------------- SHEE0105-004 07/01/2023
KERN (Excluding portion East of Hwy 395) & LOS ANGELES (North of a straight line drawn between Gorman and Big Pines including Cities of Lancaster and Palmdale) COUNTIES
Rates Fringes
SHEET METAL WORKER...............$ 45.98 29.24
----------------------------------------------------------------
TEAM0011-002 07/01/2025
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 41.59 35.69
GROUP 2....................$ 41.74 35.69
GROUP 3....................$ 41.87 35.69
GROUP 4....................$ 42.06 35.69
GROUP 5....................$ 42.09 35.69
GROUP 6....................$ 42.12 35.69
GROUP 7....................$ 42.37 35.69
GROUP 8....................$ 42.62 35.69
GROUP 9....................$ 42.82 35.69
GROUP 10....................$ 43.12 35.69
GROUP 11....................$ 43.62 35.69
GROUP 12....................$ 44.05 35.69
WORK ON ALL MILITARY BASES:
PREMIUM PAY: $3.00 per hour additional.
[29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, El Centro Naval Facility, Fort Irwin, Marine Corps
Logistics Base at Nebo & Yermo, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception,
Vandenberg AFB]
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Truck driver
GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom
GROUP 3: Driver of vehicle or combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less than 16 yds. water level; Erosion control driver
GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete truck, less than 6-1/2 yds. water level
GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work;
Slurry truck driver
GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump truck, 16 yds. to 25 yds. water level
GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver
GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder
GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over
GROUP 10: Dump truck - 50 yds. or more water level; Water
pull - single engine with attachment
GROUP 11: Water pull - twin engine; Water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments
GROUP 12: Boom Truck 17K and above
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the
contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
---------------------------------------------------------------- The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier. ?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to [email protected] or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to [email protected] or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to [email protected] or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================ END OF GENERAL DECISION"
APPENDIX A
Sidewalk, Curb Ramps, and Cross Gutter Locations
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps
CIP NO. 626
APPENDIX A
SIDEWALK AND CURB RAMPS
LOCATIONS
LOCATION OVERVIEW
SHT 4 SHT 1 of 12 SHT 2 SHT 4 SHT 6 SHT 7 SHT 9SHT 8 1
LEGEND
Sidewalk Curb Ramps
2 3
4 5
6 7
8 9
10 11 SHT 3 SHT 10 SHT 11 SHT 12
CONSTRUCTION NOTES
REMOVE EXISTING CURB RAMP CONSTRUCT ADA COMPLIANT PCC CURB RAMP PER SPPWC STD PLAN 111-5, CASE A, TYPE 6 CONSTRUCT ADA COMPLIANT PCC CURB RAMP PER SPPWC STD PLAN 111-5, CASE B, TYPE 2 ADJUST SEWER MANHOLE TO GRADE PROTECT IN PLACE Monterey Boulevard and 2nd Street, Hermosa Beach, CA 90254
MONTEREY BLVD
2ND ST
N
1 3
4 5
1 4
7 LIGHT POLE
1 3
5 7 SIGN POST
7 FIRE HYDRANT
1 3
7 SIGN POST
7 LIGHT POLE
7 SIGN POST SHT 2 of 12
7 7 UTILITY BOX
7 VENT PIPE
N Monterey Boulevard and 4th Street, Hermosa Beach, CA 90254 CONSTRUCTION NOTES REMOVE EXISTING CURB RAMP ADJUST UTILITY COVER TO GRADE PROTECT IN PLACE REMOVE EXISTING SIDEWALK CONSTRUCT 4" PCC SIDEWALK. MATCH EXISTING. CONSTRUCT ADA COMPLIANT PCC CURB RAMP PER SPPWC STD PLAN 111-5, CASE A, TYPE 4 1 6
7 8
1 MONTEREY BLVD
4TH ST 10
6 7 LIGHT POLE
1 10
6 6
7 SIGN POST
7 SCE POLE
910
8 9 112SF SHT 3 of 12 Page 457 of 874
Monterey Boulevard and 6th Street, Hermosa Beach, CA 90254 CONSTRUCTION NOTES REMOVE EXISTING CURB RAMP CONSTRUCT ADA COMPLIANT PCC CURB RAMP PER SPPWC STD PLAN 111-5, CASE A, TYPE 6 CONSTRUCT ADA COMPLIANT PCC CURB RAMP PER SPPWC STD PLAN 111-5, CASE B, TYPE 2 ADJUST UTILITY COVER TO GRADE PROTECT IN PLACE CONSTRUCT ADA COMPLIANT PCC CURB RAMP PER SPPWC STD PLAN 111-5, CASE A, TYPE 4 1 3
4 N
MONTEREY BLVD
6TH ST
3 1
6 7 LIGHT POLE
1 3 7
1 10 SIGN POST SIGN POST
1 4
7 SIGN POST
7 6
SHT 4 of 12
6 7 10
Monterey Boulevard and 10th Street, Hermosa Beach, CA 90254 CONSTRUCTION NOTES REMOVE EXISTING CURB RAMP CONSTRUCT ADA COMPLIANT PCC CURB RAMP PER SPPWC STD PLAN 111-5, CASE A, TYPE 3 CONSTRUCT ADA COMPLIANT PCC CURB RAMP PER SPPWC STD PLAN 111-5, CASE B, TYPE 2 ADJUST UTILITY COVER TO GRADE PROTECT IN PLACE 1 4
6 7
N
1 2
1 6 SIGN POST 7
7 SIGN POST
10TH ST
MONTEREY BLVD SHT 5 of 12
4 SIGN POST
2
301 2nd Street, Hermosa Beach, CA 90254 72SF
MONTEREY BLVD CONSTRUCTION NOTES REMOVE EXISTING SIDEWALK CONSTRUCT 4" PCC SIDEWALK. MATCH EXISTING. 8 9
N
8 9
SHT 6 of 12 Page 460 of 874
121 Monterey Boulevard, Hermosa Beach, CA 90254 12SF
MONTEREY BLVD CONSTRUCTION NOTES REMOVE EXISTING SIDEWALK CONSTRUCT 4" PCC SIDEWALK. MATCH EXISTING. 8 9
N
8 9
SHT 7 of 12 Page 461 of 874
309 Monterey Blvd, Hermosa Beach, CA 90254 8SF
MONTEREY BLVD CONSTRUCTION NOTES REMOVE EXISTING SIDEWALK CONSTRUCT 4" PCC SIDEWALK. MATCH EXISTING. 8 9
N
8 9
SHT 8 of 12 Page 462 of 874
435 Monterey Blvd, Hermosa Beach, CA 90254 13SF
MONTEREY BLVD CONSTRUCTION NOTES REMOVE EXISTING SIDEWALK CONSTRUCT 4" PCC SIDEWALK. MATCH EXISTING. 8 9
N
8 9
SHT 9 of 12 Page 463 of 874
446 & 515 Monterey Blvd, Hermosa Beach, CA 90254 9SF
MONTEREY BLVD CONSTRUCTION NOTES REMOVE EXISTING SIDEWALK CONSTRUCT 4" PCC SIDEWALK. MATCH EXISTING. 8 9
N
8 9
8 9 65SF
SHT 10 of 12 Page 464 of 874
726 Monterey Blvd, Hermosa Beach, CA 90254
MONTEREY BLVD CONSTRUCTION NOTES REMOVE EXISTING SIDEWALK CONSTRUCT 4" PCC SIDEWALK. MATCH EXISTING. 8 9
N
8 9 27SF
SHT 11 of 12 Page 465 of 874
947 Monterey Blvd, Hermosa Beach, CA 90254 101SF
MONTEREY BLVD CONSTRUCTION NOTES REMOVE EXISTING SIDEWALK CONSTRUCT 4" PCC SIDEWALK. MATCH EXISTING. 8 9
N
1 2
SHT 12 of 12 Page 466 of 874
APPENDIX A
Sidewalk, Curb Ramps, and Cross Gutter Locations
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps
CIP NO. 626
APPENDIX B
CITYWIDE TRUCK ROUTE MAP
PALM DR
THE STRAND
VALLEY DR
MANHATTAN AVE
ARDMORE AVE
BAY VIEW DR
PROSPECT AVE
PACIFIC COAST HWY
BEACH DR
MONTEREY BLVD
7TH ST
8TH PL
25TH ST
PIER AVE
10TH ST
5TH ST
6TH ST
2ND ST
HERMOSA AVE
14TH ST
30TH ST
HARPER AVE
31ST ST
GOULD AVE
OCEAN DR
16TH ST
29TH ST
31ST PL
28TH ST
32ND PL
SUNSET DR
30TH PL
17TH ST
33RD ST
29TH CT
33RD PL
ALLEY
28TH CT
LOMA DR
1ST ST
7TH PL
3RD ST
AVIATION BLVD
8TH ST
24TH PL
27TH ST
BOUNDARY PL
9TH ST
OZONE CT
4TH ST
1ST PL
HERONDO ST
24TH ST
LONGFELLOW AVE
ARTESIA BLVD
21ST ST
13TH ST
26TH ST
15TH ST
19TH ST OWOSSO AVE
34TH ST
RHODES ST
11TH ST
20TH ST
OAK ST
INGLESIDE DR
20TH PL
BARD ST
PARK AVE
REYNOLDS LN
MYRTLE AVE
22ND ST
GENTRY ST
HILLCREST DR
POWER ST
35TH PL
GOULD TER
1ST CT
17TH CT
18TH CT
16TH CT
18TH ST
15TH PL
19TH CT
11TH PL
14TH CT
CYPRESS AVE
13TH CT
VALLEY PARK AVE
9TH CT
CIRCLE DR
11TH CT
15TH CT
12TH CT
20TH CT
10TH CT
GOLDEN AVE
CULPER CT
6TH CT
SILVER ST
21ST CT
MASSEY AVE
MEYER CT
HILL ST
5TH CT
SPRINGFIELD AVE
4TH CT
OCEAN VIEW AVE
23RD ST
3RD CT
AMBY PL
HARPER LN
MARLITA PL
13TH ST
5TH ST
25TH ST
24TH ST
21ST ST
1ST ST
21ST ST
11TH ST
9TH ST
1ST ST
20TH ST
CYPRESS AVE
3RD ST
7TH ST 7TH ST
1ST ST
BEACH DR
4TH ST
26TH ST
18TH ST
24TH ST
30TH ST
16TH ST
20TH ST
10TH ST
15TH ST
11TH ST
18TH ST
17TH ST
OAK ST
4TH ST
9TH ST
11TH PL
2ND ST
LOMA DR
6TH ST
10TH ST
19TH ST
ALLEY
1ST PL
34TH ST
24TH PL
14TH ST
LOMA DR
3RD ST
4TH ST
11TH ST
ALLEY
24TH ST
1ST ST
8TH ST
6TH ST
19TH ST
City of Hermosa Beach
Truck Routes
"2015"
APPENDIX A
Sidewalk, Curb Ramps, and Cross Gutter Locations
CDBG Project 602667-23
Valley Drive and Monterey Avenue ADA Sidewalks & Access Ramps CIP NO. 624
APPENDIX C
SPPWC STANDARD PLANS
1 CITY OF HERMOSA BEACH CONTRACT
DOCUMENTS AND SPECIFICATIONS FOR
COMMUNITY DEVELPOMENT BLOCK GRANT (CDBG) PROJECT
602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
2 City of Hermosa Beach
NOTICE INVITING BIDS
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 3PM on Thursday, February 12, 2026, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP No. 626, CDBG Project 602732-25, Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2.
The project includes, but is not limited to, removal and replacement of sidewalks and removal and installation of ADA curb ramps at multiple locations within the City of Hermosa Beach.
The engineer’s cost estimate for the project is $151,000. License requirement is a valid State of California Contractors License Class “A”.
The duration of the project is 25 working days. All bids must be submitted electronically on Planet Bids Portal, accessible through the City’s webpage at https://www.hermosabeach.gov/ourgovernment/city-clerk/bids-and-proposals where you must first register as a vendor through our Planet Bids Portal. Contract Documents, plans, and specifications will be available for review on Planet Bids. All relevant materials shall be obtained from the link above.
This is a Federally-assisted construction contract. Federal Labor Standards Provisions including prevailing wage requirements of the Davis-Bacon and Related Acts (DBRA) will be enforced. In the event of a conflict between Federal and State prevailing wage rates, the higher of the two will prevail. The contractor’s duty to pay State prevailing wages can be found under Labor Code, Section 1770 et seq. Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and employ apprentices including forfeitures and debarment. The Prime Contractor shall be responsible for complying and ensuring compliance with the Federal Labor Standards Provisions by all sub-contractors.
Pursuant to Labor Code section 1771.1, no contractor or subcontractor may be listed on a bid proposal for a public works project submitted unless registered with the Department of Industrial Relations. Ready-mix haulers and companies that deliver ready-mixed concrete for public works projects are considered subcontractors under Labor Code section 1722.1.
Furthermore, all bidders are hereby notified that no contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations.
Prior to contract award, the contractor’s status and eligibility will be checked and verified with the California Department of Industrial Relations at http://www.cslb.ca.gov at:
https://efiling,dir.ca.gov, http://www.dir.ca.gov/dlse/debar.html and, excluding parties list at the federal System for Award Management (SAM) website https://www.sam.gov.
The Bid must include completed and signed federal labor compliance forms found in VI.
SPECIAL PROVISIONS, APPENDIX D – FEDERAL LABOR STANDARDS COMPLIANCE FORMS AND INSTRUCTIONS.
Each proposal must be accompanied by a cash deposit, a certified or cashier's check, or a
3 Bidder's bond, made payable to the City of Hermosa Beach, in an amount not less than 10 percent of the total bid submitted.
The successful Bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the Contract price, a payment bond in the amount of 100 percent of the Contract price, and a warranty bond all in the attached form satisfactory to the City Attorney.
The successful Bidder will also be required to pay the State of California prevailing wage scale as determined by the Department of Industrial Relations, available at http://www.dir.ca.gov/dlse/dlsePublicWorks.html.
The Contractor must be registered with the Department of Industrial Relations at the time of bid.
Contractor’s registration information is available at:
https://www.dir.ca.gov/Public-Works/Contractor-Registration.html The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive and responsible Bidder.
Please submit any questions related to this bid on Planet Bids portal no later than 3 PM on Wednesday, February 4, 2026.
4 TABLE OF CONTENTS
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
I. PROJECT DESCRIPTION AND UNDERSTANDING ............................................................... 5 II. NOTICE TO BIDDERS.................................................................................................................. 6 III. INSTRUCTION TO BIDDERS .................................................................................................... 8 IV. BID DOCUMENTS...................................................................................................................... 17 A. PROPOSAL....................................................................................................................................................17 B. BID SCHEDULE............................................................................................................................................18 C. BID BOND......................................................................................................................................................20 D. BIDDER'S ASSURANCE..............................................................................................................................22 E. BIDDER'S DECLARATION ........................................................................................................................23 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS....................................................25 G. CERTIFICATION OF PRINCIPAL............................................................................................................25 H. DECLARATION OF ELIGIBILITY TO CONTRACT.............................................................................27 I. NON-COLLUSION DECLARATION ..........................................................................................................28 J. REFERENCES OF WORK ...........................................................................................................................29 K. SUBCONTRACTORS LIST.........................................................................................................................31 L. IRAN CONTRACTING ACT CERTIFICATION......................................................................................34 M. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION ...........................................35 N. FLEET COMPLIANCE CERTIFICATION...............................................................................................36 V. CONTRACT DOCUMENTS........................................................................................................ 38 A. CONTRACT AGREEMENT........................................................................................................................39 B. AGREEMENT OF INDEMNIFICATION ..................................................................................................58 C. EQUALS.........................................................................................................................................................59 D.FAITHFUL PERFORMANCE BOND .........................................................................................................60 E. PAYMENT BOND (LABOR AND MATERIALS) .....................................................................................65 F. GUARANTEE TO THE CITY OF HERMOSA BEACH ...........................................................................69 G. GENERAL COMPREHENSIVE LIABLITY ADDITONAL INSURED ENDORSMENT....................70 H. AUTOMOBILE LIABILITY ADDITIONAL INSURED ENDORSEMENT ..........................................72 I. INSTRUCTIONS FOR COMPLETING, EXECUTING, AND SUBMITTING EVIDENCE OF INSURANCE TO THE OWNER ......................................................................................................................74 J. WORKER'S COMPENSATION INSURANCE CERTIFICATE..............................................................76 K. SUPPLEMENTAL INFORMATION TO BE COMPLETED BY PRINCIPAL......................................77 L. W9 FORM.......................................................................................................................................................78 VI. SPECIAL PROVISIONS............................................................................................................. 79 VII. TECHNICAL PROVISIONS .................................................................................................... 80
5 City of Hermosa Beach
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
I. PROJECT DESCRIPTION AND UNDERSTANDING
This project is funded in whole or in part with Community Development Block Grant (CDBG) funds provide by the U.S. Department of Housing and Urban Development (HUD). Federal Labor Standards Provisions, including prevailing wage requirements of the Davis-Bacon and Related Acts will be enforced. In the event of a conflict between Federal and State wage rates, the higher of the two will prevail.
All Bidders are hereby noticed that new Los Angeles County insurance requirements must now be met prior to the award of a construction contract. Please see Exhibit D for the specific insurance requirements.
The scope of the work is to reconstruct curb ramps and sidewalks along Monterey Blvd. To ensure pedestrian safety and uninterrupted flow through the work area, pedestrian and vehicular traffic control measures are required, including signage and protective barriers.
All sidewalks and access ramps must be replaced within 72 hours of removal and completed before Friday to ensure they are open to the public for the weekend.
6 II. NOTICE TO BIDDERS
Prospective Bidder: To be considered as a responsive Bidder you must register on Planet Bids portal through the city’s website at https://www.hermosabeach.gov/our-government/cityclerk/bids-and-proposals .
Pre-bid Meeting: pre-bid meeting will be held for this project. However, each prospective Bidder shall familiarize itself with the plans and work site(s) to satisfy itself that it has the abilities and resources to complete the work.
Bid Documents: Bid Documents, including but not limited to specifications and proposal forms, will be available for download on Planet Bids Portal, accessible through the webpage at:
https://pbsystem.planetbids.com/portal/51313/bo/bo-search.
To the extent required by Section 20103.7 of the Public Contract Code, upon request from a Contractor plan room service, the City shall provide an electronic copy of the Contract Documents at no charge to the Contractor plan room.
It is the responsibility of each prospective Bidder to download and print all bid documents for review and to verify the completeness of Bid Documents before submitting a bid. The City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading, or printing of the Bid Documents.
Questions: All questions regarding this bid shall be submitted through Planet Bids no later than February 4, 2026 at 3P.M.. Proposers shall not contact City personnel or Elected Officials with any questions or clarifications concerning this Invitation for Bids other than through Planet Bids.
Any City response for this Bid that is not posted through Planet Bids is unauthorized and will be considered invalid.
Submittal of Bids: Electronic bids shall be submitted through Planet Bids until February 12, 2026 at 3P.M. at which time they will be publicly opened and read in the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA. All bids shall be valid for a period of 90 calendar days after the bid opening date.
Bidder’s Guarantee: Each bid must be accompanied by cash or a certified check or a cashier's check or Bidder's bond made payable to the City of Hermosa Beach for an amount equal to at least ten percent (10%) of the bid price. In accordance with Public Contract Code Section 20170, the Bidder’s Bond shall be issued by a surety company admitted to do business in the State of California. Further, in accordance with Public Contract Code Section 20172, such guarantee shall be forfeited should the Bidder to whom the Contract is awarded fail to enter into the Contract within the specified time.
Payment, Performance Bonds: The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond, each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein and shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer.
7 Substitution of Securities: Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by the City to ensure its performance under the Contract.
Contractor License: In accordance with provisions of Section 3300 of the California Public Contract Code, City of Hermosa Beach has determined that the Contractor shall possess a valid “A” California Contractor’s License. Failure to possess such license may render the bid as nonresponsive and bar the award of the Contract to that non-responsive Bidder.
Prevailing Wages: Pursuant to Labor Code Section 1773, the Contractor shall pay the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in Los Angeles County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this Contract. A copy of these prevailing wage rates may be obtained by visiting: https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html In addition, a copy of the prevailing rate of per diem wages will be made available at the City’s Public Works Department upon request. The successful Bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory for the Bidder to whom the Contract is awarded, and for any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor, and debarment of Contractors and subcontractors.
Contractor’s Registration with the Department of Industrial Relations (DIR): The Bidder’s attention is directed to Labor Code Section 1725.5, which provides that a Contractor or subcontractor shall not be qualified to bid on, be listed in a Bid proposal, subject to the requirements of Public Contract Code Section 4104, or engage in the performance of any Contract that is subject to Labor Code Section 1720 et seq., unless currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5. No Bid will be accepted, nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the DIR to perform public work. If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project.
Compliance Monitoring and Enforcement: Contractor’s performance of the Work described in the Notice Inviting Bids is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this Contract and applicable law in its Bid.
Award of Contract: The City shall award the Contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the total base bid. City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.
8 III. INSTRUCTION TO BIDDERS
Form of Proposal: The proposal shall be fully executed and submitted on the forms provided by the City. Proposal forms can be obtained from Planet Bids.
Signatures: All places where signatures are required must be fully executed.
Proposal: Documents which shall be signed and returned to the City with the Bid Proposal are:
A. Proposal
B. Bid Schedule
C. Bid Bond
D. Bidder’s Assurance
E. Bidder’s Declaration
F. Certificate of Non-Discrimination by Contractors
G. Certification of Principal
H. Declaration of Eligibility to Contract
I. Non-Collusion Declaration
J. References for Work
K. SubContractor List
L. Iran Contracting Act Certification
M. Public Works Contractor Registration Certification
N. Fleet Compliance Certification Form
O. Addenda (if applicable)
Contract: Documents which shall be signed and returned to the City by the successful Bidder within 10 days of notification of intent to award Contract:
A. Contract Agreement
B. Agreement of Indemnification and Hold Harmless and Waiver of Subrogation and Contribution
C. Equals
D. Faithful Performance Bond
E. Payment Bond (Labor and Materials)
F. Guarantee to the City of Hermosa Beach
G. General Comprehensive Liability Additional Insured Endorsement H. Automobile Liability Additional Insured Endorsement
I. Instructions for Completing, Executing, and Submitting Evidence of Insurance to the Owner
J. Worker’s Compensation Insurance Certificate
K. Supplemental Information to be Completed by Principal L. W-9 Form
M. Copy of City Business License
N. Pollution Liability Insurance Additional Insured Endorsement Delivery of Proposal: Each Bid prepared by Bidder shall be completed in itself and shall be submitted electronically through Planet Bids.
9 Prevailing Wage: In accordance with the provisions of Section 1770 et seq., of the Labor Code, the Director of the Department of Industrial Relations of the State of California has ascertained the general prevailing rate of wages which is the minimum amount which shall be paid to all workers employed to perform the work. A copy of the determination is on file in the office of the City Clerk and is hereby incorporated herein and made a part hereof as though fully set forth herein.
A copy of the determination will be made available to any interested person upon request and shall be posted at the job site.
Overtime: As per Labor Code Section 1810 et seq., eight (8) hours is the legal working day. The Contractor shall pay overtime for each worker who works in excess of the legal working day.
Payment: Refer to the Contract Agreement for payment information. Contractor shall submit progress payment requests on City approved form.
Required Bonds: Prior to the execution of the Contract, the successful Bidder shall file with the City surety bonds in the amounts and for the purposes noted below. The surety insurer shall be a California admitted surety insurer, as defined in Code of Civil Procedure section 995.120.
Contractor shall pay all premiums and costs thereof and incidental thereto.
Per Civil Code section 3247, a Payment Bond is required if the Contract is for more than $25,000.
The successful Bidder shall give three (3) surety bonds with good and sufficient sureties:
"Payment Bond – Labor and Materials" shall be so conditioned as to insure to the benefit of persons furnishing materials for or performing labor upon the work. Bond to be in the sum of not less than 100% of the Contract price to assure the claims of materialmen supplying materials to Contractor, and for payment to laborers and subcontractors employed on the project. “Faithful Performance Bond" in the sum of not less than 100% of the Contract price to assure the faithful performance of the Contract; shall be conditioned as to assure the faithful performance by the Contractor of all work under said Contract, in a manner that is satisfactory and acceptable to the City; that all materials and workmanship supplied by him will be free from original or developed defects; and that should original or developed defects or failures appear, the Contractor shall, at his own expense, make good such defects and failures and make all replacements and adjustments required, within a reasonable time after being notified by the City to do so, and to the satisfaction of the City.
Rejection of Proposals: The City reserves the right to reject any and all proposals and to waive any minor or technical discrepancies or irregularities. Proposals may be rejected if they show any alteration of form, additions not called for, conditional bids, incomplete bids, erasures, or irregularities of any kind.
Agents: When proposals are signed by an agent, other than the officer or officers of a corporation authorized to sign Contracts on its behalf or a member of a partnership, a "Power of Attorney" must be on file with the City prior to opening bids or shall be submitted with the proposal; otherwise, the proposal will be rejected as irregular and unauthorized.
Withdrawal of Proposals: Any bid may be withdrawn at any time prior to the time fixed in the public notice for the opening of bids only by written request for the withdrawal of the bid filed with the City Engineer. The request shall be executed by the Bidder or their duly authorized
10 representative. The withdrawal of a bid does not prejudice the right of the Bidder to file a new bid. Bids are opened exactly at the time fixed in the public notice for opening bids. A bid will not be received after that time, nor may any bid be withdrawn after that time. No Bidder may withdraw his bid within ninety (90) days after the actual date of the opening thereof.
Insurance: Without limiting Contractor's indemnification, Contractor shall maintain in force at all times during the performance of this agreement the insurance provisions set out in the Contract Agreement.
City Business License and Permits: The successful Bidder shall obtain a valid City of Hermosa Beach Business License prior to commencing work under this Contract.
The successful Bidder will be required to obtain City Right of Way Permit to work in public rightof-way, issued at no fee for the project.
Increased or Decreased Quantities: The City reserves the right to increase, or decrease, or to entirely eliminate items or portions of items from work if found desirable or expedient.
Approximate Estimate: The quantities in the Bid Schedule are approximate only, being given as a basis for the comparison of bids. The City does not, expressly or by implication, agree that the actual amount of work will correspond therewith. The Contractor shall verify in the field the accuracy of the estimated quantities.
Examination of Plans, Specifications, Contract, and Site of Work: The Bidder shall examine carefully the site of the work contemplated, the Plans and Specifications, and the proposal and Contract forms therefor. The submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and scope of work to be performed, the quantities of materials to be furnished, and as to the requirements of the proposal, Plans, Specifications, and the Contract.
Where the City may have made investigations of subsurface conditions in areas where work is to be performed under the Contract, such investigations are made only for the purpose of study and design. Where such investigations have been made, Bidders or Contractors may, upon written request, inspect the records of the City as to such investigations subject to and upon the conditions hereinafter set forth. Such inspection of records may be made at the office of the City Engineer.
The records of such investigations are not a part of the Contract and are shown solely for the convenience of the Bidder or Contractor. It is expressly understood and agreed that the City assumes no responsibility whatsoever in respect to the sufficiency or accuracy of the investigations thus made, the records thereof, or of the interpretations set forth therein or made by the City in its use thereof and there is no warranty or guaranty, either expressed or implied, that the conditions indicated by such investigations or records thereof are representative of those existing throughout such areas, or any part thereof, or that unlooked for developments may not occur, or that materials other than, or in proportions different than these indicated, may not be encountered.
Bidders shall satisfy themselves by personal examination of the locations of the proposed work, and by such other means as they may choose as to actual conditions and requirements and as to the accuracy of the quantities stated in the Proposal forms. Information derived from the maps, plans, specifications, profiles, or drawings, or from the Engineer or his assistants (or the
11 Architects or their assistants), shall not relieve the Bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary investigations is not guaranteed nor is any liability assumed by the City.
If a prospective Bidder is in doubt as to the true meaning or intent of any part of the Contract Documents including the Specifications, or discovers discrepancies in, or omissions from, the Specifications or Drawings, they may submit to the Engineer a written request for an interpretation or a correction thereof via Planet Bids. Interpretations or corrections of the Contract Documents including the Specifications and Drawings, shall be made only by addendum duly issued by the Engineer, and a copy of such addendum will be uploaded on Planet Bids and such addendum shall be considered a part of and incorporated in the Contract Documents.
Relief of Bidders: If the Bidder claims a mistake was made in their bid, the Bidder shall give the City written notice within five (5) days after the opening of the bids of the alleged mistake, specifying in the notice in detail how the mistake occurred.
Disqualification of Bidders: More than one proposal from an individual, firm, partnership, corporation, or combination thereof under the same or different names will not be considered.
Reasonable grounds for believing that any individual, firm, partnership, corporation, or combination thereof is interested in more than one proposal for the work contemplated may cause the rejection of all proposals in which such individual, firm, partnership, corporation, or combination thereof is interested. If there is reason for believing that collusion exists among the Bidders, any or all proposals may be rejected. Proposals in which the prices obviously are unbalanced due to mathematical errors may be rejected.
Award of Contract: The award of the Contract, if it be awarded, will be to the lowest responsible Bidder whose proposal complies with all of the requirements prescribed. Such award, if made, will normally be made within in ninety (90) calendar days of the opening of the proposals.
If the lowest responsible Bidder refuses or fails to execute the Contract, the City may award the Contract to the second lowest responsible Bidder. If the second lowest responsible Bidder refuses or fails to execute the Contract, the City may award the Contract to the third lowest responsible Bidder.
Execution of Contract: The Contract shall be signed by the successful Bidder and returned, together with the Contract bonds, insurance endorsements and certificates, and all other required documents within ten (10) business days after the Bidder has received notice of intent to award.
Failure to Execute Contract: Failure of the lowest responsible Bidder, the second lowest responsible Bidder, or the third lowest responsible Bidder to execute the Contract and file acceptable bonds as provided herein within ten (10) business days after such Bidder has received notice that the Contract has been awarded to them shall be just cause for the forfeiture of the proposal guaranty. The successful Bidder may file with the City Engineer a written notice, signed by the Bidder, or his authorized representative, specifying that the Bidder will refuse to execute the Contract if presented to him. The filing of such notice shall have the same force and effect as the failure of the Bidder to execute the Contract and furnish acceptable bonds within the time herein above prescribed.
Return of Proposal Guaranties: Within ten (10) business days after the award of the Contract to the lowest responsible Bidder, the City will return the proposal guaranties, other than Bidder's
12 bonds, accompanying such of the proposals as are not to be further considered in making the award. Retained proposal guaranties will be held until the Contract has been finally executed, after which all proposal guaranties, except Bidder's bonds and any guaranties which have been forfeited, will be returned to the respective Bidders whose proposals they accompany.
Qualifications of Bidders: Each Bidder shall be skilled and regularly engaged in the general class or type of work called for under the Contract. A statement setting forth their experience shall be submitted by each Bidder on the References of Work form provided herein.
Each Bidder shall possess valid active Contractor’s License issued by the Contractor’s State License Board at the time their bid is submitted. The class of license shall be applicable to the work specified in the Contract. Each Bidder shall also have no less than five (5) years’ experience in the magnitude and the character of the work bid.
Pursuant to section 1103 of the Public Contract Code, City staff has determined that the following non-exhaustive experience is reasonably necessary to satisfactorily perform the public works Contract:
The Contractor shall have a minimum of three (3) projects of similar type of construction and magnitude with other public agencies within the past five (5) years.
The Contractor shall have been in the business under the same name and California Contractor’s License for a minimum of five (5) continuous years prior to the bid opening date for this project.
The license used to satisfy this requirement shall be of the same type as that required by the Contract.
The Contractor shall perform above 50% of the Contract with its own forces.
Bidders must be thoroughly competent and capable of satisfactorily performing the work covered by the proposal. They shall have had project experience similar to the project scope of work.
When requested, they shall furnish such statements relative to previous experience on similar work, the plan or procedure proposed, and the organization, machinery, plant, and other equipment available for the contemplated work, and the financial condition and resources of the Bidder, as may be deemed necessary by the City Engineer in determining such competence and capability.
The City of Hermosa Beach will not enter into a Contract with any Bidder who is not properly licensed to do the work of this Contract under the provisions of Section 7000 et seq., of the Business and Professions Code, unless particularly exempted by the terms thereof. A bid by a Contractor who is not properly licensed shall be considered non-responsive and will be rejected.
The Contractor must hold all sub-Contractors to these same Contract requirements.
The sheet for Bidder's signature in the Bid Proposal shall clearly show the Contractor's name, address, telephone number, State of California Contractor’s license number, classification, and date of expiration.
Completeness of Bids: Bids are required for the entire work. The amount of the bid for comparison purposes will be the total bid price of all items. The Bidder shall set forth the bid price for each item in the respective spaces provided for these purposes.
13 In case of discrepancy between the unit price and the total set forth for the item, the unit price shall prevail, provided, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or in the case where the unit price is the same amount as the entry in the "Total" column, then the amount set forth in the "Total" column for the item shall prevail in accordance with the following:
a) As to lump sum items, the amount set forth in the "Total" column shall be the unit price. b) As to unit price items, the amount set forth in the "Total" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price.
The City may waive technical or non-substantive inconsistencies in any bid.
Non-discrimination: Pursuant to the provisions of 31 CFR, Part 51, Section 51.55, the Revenue Sharing Act, notice is hereby given of the following policy, effective immediately:
The City of Hermosa Beach does not discriminate on the basis of handicapped status in admission or access to, or treatment of, or employment in, its programs and activities. The office that will coordinate compliance is that of Human Resources.
Workers’ Compensation Insurance: Before execution of this Agreement by the City, the Contractor shall file with the City’s Risk Manager the following signed certification:
“I am aware of, and will comply with, Section 3700 of the Labor Code, requiring every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance before commencing any of the work.”
The Contractor shall also comply with Section 3700 of the Labor Code by securing, paying for and maintaining in full force and effect for the duration of this Agreement, complete Workers’ Compensation Insurance, and shall furnish a Certificate of Insurance to the City’s Risk Manager reflecting such insurance before this Agreement becomes effective. Contractor shall fully indemnify and hold harmless City, its attorneys, agents, officers, and employees for any claims in law or equity occasioned by the failure of Contractor to comply with the terms of this section.
Every Workers’ Compensation Insurance policy required hereunder, shall bear an endorsement, or shall have attached a rider, providing that in the event of expiration or proposed cancellation of such policy for any reason whatsoever, the City’s Risk Manager shall be notified of such action by registered mail, postage prepaid, return receipt requested, at least 30 days before such expiration or cancellation becomes effective.
Indemnification: Bidders are instructed to refer to the Contract Agreement.
Subcontractors: Bidders must list the name, address of the place of business, Contractor license number, and DIR registration number for each subcontractor to be responsible for more than 1/2 of 1% of the total bid, and the portion of the job for which that subcontractor is responsible. Only one subcontractor may be listed for each portion of the job.
Unfair Business Practices Claims: In entering into a public works Contract or a subcontract to supply goods, services, or materials pursuant to a public works Contract, the Contractor or subContractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7
14 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works Contract or the subcontract. This assignment shall be made and become effective at the time the awarding body renders final payment to the Contractor without further acknowledgment by the parties. (Section 7103.5, California Public Contract Code.) Bidder Registration Requirement: Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations (DIR). No bid will be accepted, nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the DIR to perform public work. If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project. To this end, Bidder shall sign and submit with its bid proposal the Public Works Contractor Registration Certification on the form provided, attesting to the facts contained therein. Failure to submit this form may render the bid non-responsive. In addition, each Bidder shall provide the registration number for each listed subcontractor in the space provided in the Subcontractors List form.
Claim Procedures: Bidders are instructed to refer to the Contract Documents, including by way of illustration and not by limitation the Contract Agreement.
Protest Procedures: Bidders may file a “protest” of a bid proposal with the City’s City Manager. In order for a Bidder’s protest to be considered valid, the protest must:
A. Be filed in writing within five (5) calendar days after the bid opening date; B. Clearly identify the specific irregularity or accusation; C. Clearly identify the specific City staff determination or recommendation being protested; D. Specify in detail the grounds for protest and the facts supporting the protest; E. Include all relevant supporting documentation with the protest at time of filing; and F. Be transmitted concurrently to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.
If the protest does not comply with each of these requirements, the City may reject the protest with or without further review.
If the protest is timely and complies with the above requirements, the City Manager, or other designated City staff member, shall review the protest, any response from the challenged Bidder(s), and all other relevant information, and will provide a written decision to the protestor.
The City Manager or designee shall have up to ten calendar days to decide whether to approve or reject the protest. The written decision of the City Manager or designee on the protest shall be served upon the protesting Bidder and any Bidder subject to the protest within fourteen (14)
15 calendar days of receipt of the bid protest. The City Manager or designee may extend the ten (10) calendar days if necessary, to review additional information requested from any Bidder.
If the protester wishes to further contest the protest, it shall appeal this decision to the Acting Pursuant to Authority Delegated by the City Council by filing a statement of appeal with the City Clerk within five (5) days of the issuance of the City Manager’s decision. Said statement of appeal shall include all information required of the original bid protest, as well as s short and plain statement setting forth why Protester disputes the City Manager’s decision and the legal and factual basis for such dispute. Any person or entity may present a formal protest to the City with respect to solicitations being conducted by staff.
A Bidder whose bid has been protested by another Bidder may submit to the City Manager a written response to the protest by email or by personal delivery or overnight mail to City Hall, 1315 Valley Drive, Hermosa Beach, California 90254, so that it is received by the City no later than seven calendar days after the protest has been served by the protesting Bidder.
1. Definitions
a. “Bidder” means any person or firm providing a timely, written response to the City solicitation.
b. “Bid Protest” means any protest with regard to the response submitted by another Bidder.
c. “Response” means the written response to the City solicitation provided by a person or firm.
d. “Solicitation Protest” means a statement of protest, dispute, challenge, disagreement, disapproval or other objection regarding documents, determinations or actions taken or contemplated by the City with respect to a solicitation. e. “Solicitation” means the document by which the City identifies goods, equipment, services, or public construction projects for which it seeks a response.
2. Format – The protest must be in writing and include the following information at a minimum:
a. The name, address, and phone number of the protester, or the authorized representative of the protester;
b. The signature of the protester or authorized representative of the protester; c. The project number and title under which the protest is submitted; d. A detailed description of the legal and/or factual grounds for the protest and all supporting documentation. For protests containing elements not based on publicly released information the protest must contain documentation clearly showing the date on which the protester received the information; and e. The form of relief requested.
3. State or Federal Funding
16 If the subject matter of the solicitation or project is receiving any state or federal funds which requires a protest procedure different than the procedures stated above, then that protest procedure shall control.
In the event there is any lawsuit filed against the City relating to any federally funded project, the City will provide prompt notice of that lawsuit to all agencies who participated in the funding of the project.
4. Mandatory Procedure
This administrative procedure and the time limits set forth herein are mandatory. Failure to comply with these mandatory procedures shall constitute a waiver of any right to pursue the bid protest, including filing a Government Code claim or any legal proceedings or actions.
17 IV. BID DOCUMENTS
A. PROPOSAL
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
CONTRACTOR: Date: ___________________
TO: City of Hermosa Beach
Acting Pursuant to Authority Delegated by the City Council Hermosa Beach, California, 90254
Ladies and Gentlemen:
The undersigned declares that he/she has carefully examined the location of the proposed work and that he/she has examined the Plans and Specifications, has read the Contract Documents, and hereby agrees to furnish all labor, materials, equipment, tools, transportation, and services to do all work required for:
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
In accordance with the Plans and Specifications prepared by the Engineer, in accordance with the Special Provisions, the Contract Documents, and in accordance with the Standard Specifications for Public Works Construction 2021, Unified Building Code for Construction (current edition) (except Sections 1-9), and the requirements of the Engineer under said documents, for the prices shown herein.
The Contractor also certifies that he/she is registered with the Department of Industrial Relations.
All work shall be completed within 25 days from the date the Notice to Proceed is issued by the Engineer.
Contractor Signature PWCR Registration Number
18 B. BID SCHEDULE
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
(Total Bid in Figures)
(Total Bid in Words)
Contractor Name:
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be Item
No.
Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
1 1 LS
Mobilization and Demobilization
(5% max. of total bid schedule
cost)
7-3.4
- $
2 1 LS Traffic Control 601-3.5.2
601-7
- $
3 419 SF Remove Existing Sidewalk 303-5.9 $ $
4 11 EA Remove Existing Curb Ramp 303-5.9 $ $
5 419 SF Construct PCC Sidewalk 303-5.9 $ $
6 1 EA
Construct ADA Compliant PCC
Curb Ramp per SPPWC STD
Plan 111-5, Case A, Type 3
303-5.9
$ $
7 3 EA
Construct ADA Compliant PCC
Curb Ramp per SPPWC STD
Plan 111-5, Case A, Type 4
303-5.9
8 4 EA
Construct ADA Compliant PCC
Curb Ramp per SPPWC STD
Plan 111-5, Case A, Type 6
303-5.9
$ $
9 3 EA
Construct ADA Compliant PCC
Curb Ramp per SPPWC STD
Plan 111-5, Case B, Type 2
303-5.9
$ $
19 considered to represent the Bidder’s intention and all totals will be corrected to conform thereto.
Attached hereto is cash, a certified check, a cashier's check, or a Bidder's bond in the amount of
__________________________________________________Dollars, said amount being not less than ten (10) percent of the amount bid. It is agreed a portion equal to the difference between the low bid and second low bid shall be retained as liquidated damages by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.
Contractor Signature: __________________________________________ PW Registration #:
State License #: _________
Contractor Company Name: __________________________________________
20 C. BID BOND
KNOW ALL MEN BY THESE PRESENTS:
WHEREAS, ________________________________, (hereinafter referred to as "Contractor") intends to submit a bid to the City of Hermosa Beach, California, a Municipal Corporation, for the performance of certain work as required in the City of Hermosa Beach CDBG Project 602732-25 Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626 said work being: CDBG Project 602732-25 Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626 as shown in this specification, and in compliance with the specifications therefore under an invitation of said City contained in a notice or advertisement for bids or proposals.
NOW, THEREFORE, we, the Contractor, as Principal, and ______________________ _______________________________ a corporation organized and existing under the laws of the State of _________________, duly authorized to transact business under the laws of the State of California as Surety, are held and firmly bound unto the City of Hermosa Beach, as Obligee, in the sum of ___________________________________ Dollars ($_______________) lawful money of the United States of America, said sum being not less than ten percent (10%) of the bid amount for the payment of which sum well and truly to be made, the said Principal, and said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT: If the bid of the said Principal is rejected by the said Obligee; or if the said Obligee shall accept the bid of the said Principal and said Principal shall enter into an Agreement with said Obligee in accordance with the terms of the bid, and shall give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Agreement and for the prompt payment of labor and material furnished in the prosecution thereof; or in the event of the failure of said Principal to enter such Agreement and give such bond or bonds, if said Principal shall pay to said Obligee the difference not to exceed the penalty thereof between the amount specified in said bid and such larger amount for which said Obligee may in good faith Contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. In case suit is brought upon this bond, the court shall fix and award and the surety shall pay, in addition to the face amount hereof, costs and reasonable attorney's fees incurred by the City of Hermosa Beach in successfully enforcing said obligation.
IN WITNESS THEREOF, we have hereunto, set our hands and seals this ___________ day of ______________________, ______.
Principal
By _______
Title _
_____________________________________
Surety
By:__________________________________
_____________________________________
21 Title
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
22 D. BIDDER'S ASSURANCE
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
FROM:
Name of Bidder:
Business Address:
Telephone No:
TO:
Acting Pursuant to Authority Delegated by the City Council c/o City Hall
City of Hermosa Beach, California
Acting Pursuant to Authority Delegated by the City Council :
Pursuant to your published Notice Inviting Bids for: CDBG Project 602732-25 Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626 The undersigned declares that he/she has carefully examined the location of the proposed work; that he/she has carefully examined the Plans and Specifications, and read the accompanying Instructions to Bidders and hereby proposes to furnish all materials, machinery, tools, labor, and services and do all the work necessary to complete the project in accordance with said Plans and Specifications and other Contract Documents at the item prices on the bidding schedule.
BY: TITLE:
23 E. BIDDER'S DECLARATION
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
It is understood and agreed that:
1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, Warranty Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.
2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.
3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.
4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.
The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.
The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.
5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other Bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding.
6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the Owner after evaluation of the bids as submitted. The undersigned agrees that the Owner shall recover or retain as liquidated damages an amount equal to the difference between the low bid and amount of the bid of the Bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest Bidder in accordance with the provisions of the Public Contract Code section 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefor within the time provided.
7. This bid will not be withdrawn within a period of ninety (90) days after the date of its proper opening by the City.
24 8. The undersigned Bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.
Respectfully submitted,
Contractor's Business Name Contractor Signature Title
Business Address: Street By Title
City State Zip Contractor's License No. and Classification Business Phone Number Date
Name Title Residence: Street
City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the Bidder, whose address must be given: if it is made by a firm, it must be signed in the co-partnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each member must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.
25 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.
We agree specifically:
1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.
2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.
3. To take affirmative steps to hire minority employees within the company.
FIRM
TITLE OF PERSON SIGNING
SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:
26 G. CERTIFICATION OF PRINCIPAL
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract. (Section 1861, Labor Code.) Signature:
Name:
Title:
Name of Company:
27 H. DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
The undersigned, a duly authorized representative of the Contractor, certifies and declares that:
1. The undersigned Contractor is aware of Section 1771.1 and 1777.7 of the California Labor Code, which prohibit a Contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.
2. The undersigned Contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.
3. The undersigned Contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a Contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a Contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.”
“(b) Any Contract on a public works project entered into between a Contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works Contract, and any public money that may have been paid to a debarred subcontractor by a Contractor on the project shall be returned to the awarding body. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”
4. The undersigned Contractor has investigated the eligibility of each and every subcontractor the undersigned Contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of
, at (place of execution),
California.
Signature:
Name:
Title:
Name of Company:
28 I. NON-COLLUSION DECLARATION
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
The undersigned declares:
I am the ___________________ of ______________________________, the party making the foregoing Bid.
The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham.
The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on __________ [date], at ___________________ [city], ___________________ [state].
NAME OF BIDDER
SIGNATURE OF BIDDER
ADDRESS OF BIDDER
CITY STATE ZIP
29 J. REFERENCES OF WORK
CDBG Project 602732-25
Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2 CIP NO. 626
Provide names, addresses, phone numbers and email addresses for at least three public agencies for which Bidder has performed similar work within the past five years.
All contact information must be current.
1. _______________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________
2.______________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
30 ___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________
3.________________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________
For additional References, please add separate sheets.
NAME OF BIDDER