AGREEMENT

PROJECT NO. 19108

Market Street Improvements from Rubidoux Blvd. to Via Cerro

THIS Agreement, made and entered into the 15 th day of May 2025, between the City of Jurupa Valley, a municipal corporation, hereinafter called the "City" and Calmex Engineering, Inc., hereinafter called the "Contractor."

That the City and the Contractor for the consideration hereinafter named, agree as follows:

1. Scope of Services. Contractor shall perform the work and provide all labor, materials, equipment and services, except as otherwise provided in the Plans or Special Provisions, in a good and workmanlike manner for the project identified as Market Street Improvements from Rubidoux Blvd. to Via Cerro in accordance with this Agreement. The complete Agreement includes all of the Documents as if set forth in full herein, to wit, including the Agreement, any and all Contract Change Orders issued after the execution of the Agreement, Addenda No(s). N/A issued prior to the opening of the Bids, the Special Provisions (which includes the General Provisions and Technical Provisions), the Project Plans, the Standard Plans, the Standard Specification, reference Specifications, the Bidder's Proposal, the Notice Inviti ng Bids, the Non- Collusion Affidavit, the Faithful Performance Bond, the Labor and Materials Payment Bond and insurance (the “Documents”), all of which are essential parts of the Agreement between City and Contractor and are hereby made a part of this Agreement. In the event of any conflict in the provisions thereof, the terms of said Documents as set forth above shall control, each over the other, in the order provided.

2. Compensation. The City will pay the Contractor and the Contractor agrees to receive and accept the prices set forth in the Bid Schedule as full compensation for the work required under the bid items awarded by the City, to wit, the Base Bid Item(s) in the sum total amount of Three Million Two-Hundred Twenty-Seven Thousand and Seventy-Five Cents ($3,227,000.75), subject to additions or reductions of the quantities of the various bid items at the unit prices bid, for furnishing all materials and for doing all the work contemplated and embraced under the Documents.

3. Payments. City shall make payments within thirty (30) days after receipt of an undisputed and properly submitted payment request from Contractor. City shall return to Contractor any payment request determined not to be a proper payment request as soon as practicable, but not later than seven (7) days after receipt, and shall explain in writing the reasons why the payment request is not proper.

A payment shall be made as the City Council of the City prescribes upon estimates approved by the City Council. However, progress payments shall not be made in excess of ninety-five percent (95%) of the percentage of actual work completed plus a like percentage of the value of material delivered on the ground or stored subject to, or under the control of, the City, and unused. The City Regular City Council Meeting - May 15, 2025

Page 262 of 583 ends

shall withhold not less than five percent (5%) of the Agreement price until final completion and acceptance of the Project. However, at any time after fifty percent (50%) of the work has been completed, if the City Council of the City finds that satisfactory progress is being made, it may, at its discretion, make any of the remaining progress payments in full for actual work completed.

4. Time. The Contractor hereby agrees to commence work pursuant to this Agreement within fourteen (14) calendar days after the date of authorization specified in the Notice to Proceed. The Contractor agrees to diligently prosecute the work, including corrective items of work, day to day thereafter, to completion, within Ninety (90 ) Working Days after said date in the “Notice to Proceed with Construction,” except as adjusted by subsequent Contract Change Order(s).

5. Liquidated Damages. The City and Contractor hereby agree that in case all construction called for under the Agreement is not completed within the time hereinabove specified, including City caused delays or extensions, damages will be sustained by the City and that, it is and will be impracticable or extremely difficult to ascertain and determine the actual amount of damages the City will sustain in the event of, and by reason of, such delay.

It is, therefore, agreed that such damages shall be presumed to be in the amount of $1,000.00 per calendar day, and that the Contractor will pay to the City, or City may retain from amounts otherwise payable to Contractor, said amount for each calendar day by which the Contractor fails to complete the work, including corrective items of work, under this Agreement within the time hereinabove specified and as adjusted by Contract Change Order(s ). The Contractor will not be assessed liquidated damages for delay(s) occasioned by the failure of the City or of the owner of a utility to provide for the removal or relocation of utility facilities.

6. Insurance. The Contractor shall at all times during the term of this Agreement carry, maintain, and keep in full force and effect: (1) a policy or policies of broad- form comprehensive general liability insurance with minimum limits of $2,000,000.00 combined single limit coverage against any injury, death, loss, or damage as a result of wrongful or negligent acts by the Contractor, its officers, representatives, volunteers, employees, agents, and independent contractors in performance of services
under this Agreement; (2) property damage insurance with a minimum limit of $1,000,000.00; (3) automotive liability insurance with a minimum combined single limits coverage of $1,000,000.00; and (4) workers’ compensation insurance with a minimum limit of $1,000,000.00 or the amount required by law, whichever is greater.

Acceptable insurance coverage shall be from an admitted corporate surety insurer licensed in the State of California, approved by the City, and with a rating of, or equivalent to, A:VII by A.M. Best & Company. Any deviation from this rule shall require specific approval, in writing, from the City.

All insurance policies shall provide that the insurance coverage shall not be non-renewed, canceled, reduced, or otherwise modified (except through addition of additional insured to the policy) by the insurance carrier without the insurance carrier giving the City thirty (30) days prior written notice thereof by certified mail, return receipt requested. The Contractor agrees that it will not cancel, reduce or otherwise modify said insurance coverage.

The Contractor agrees that if it does not keep the aforesaid insurance in full force and effect, and such insurance is available at a reasonable cost, the City may take out the necessary insurance and pay the premium thereon, and the repayment thereof shall be deemed an obligation of the Contractor and the cost of such insurance may be deducted, at the option of the City, from payments due the Contractor.

Regular City Council Meeting - May 15, 2025

Page 263 of 583 ends

The Contractor shall submit to the City (1) insurance certificates indicating compliance with the minimum workers’ compensation insurance requirements above, and (2) insurance policy endorsements not less than one (1) day prior to beginning of performance under this Agreement.

Any deductibles must be declared to and approved by the City.

The general liability and automobile liability policies must contain or be endorsed to contain the following provisions: “The City of Jurupa Valley, its elected and appointed officials, officers, agents, employees, and volunteers are to be covered as insureds with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the contractor; and with respect to liability arising out of work or operations performed on behalf of the City of Jurupa Valley, including materials, parts or equipment furnished in connection with the work or operations.”

The insurance provided by Contractor shall be primary to any coverage available to the City.

The Contractor shall furnish the City with original certificates and amendatory endorsements effecting coverage required herein. All certificates and endorsements are to be received and approved by the City before work commences. The City may require, at any time, complete, certified copies of all required insurance policies, including endorsements affecting the coverage.

7. Bonds. The Contractor hereby agrees to provide and maintain in effect two (2) good and sufficient Surety Bonds for one hundred percent (100%) each of the contract price. The bonds shall be a "Faithful Performance Bond" which shall guarantee the faithful performance of all work and a "Labor and Materials Payment Bond" which shall secure the payment of the claims of labor, mechanics, or materialmen for all work under the Agreement pursuant to Section 9550 of the Civil Code.

8. Contractor’s Guarantee. The Contractor, the Contractor’s heirs, executors, administrators, successors, or assigns guarantee that all work performed under this Agreement fully meets the requirements thereof as to quality of workmanship and materials furnished. If any defects in materials or workmanship become evident within a period of one year from the date of the acceptance of the work by the City Council, the Contractor shall, at his or her own expense, make any repair(s) or replacement(s) necessary to restore the work to full compliance with the Plans and Specifications.

9. Labor Standards and Prevailing Wages. The Contractor shall comply with the Davis -Bacon Fair Labor Standards Act (40 USC a- 276, a-5) and the implementation regulations thereof. Contractor shall comply with the U.S. Department of Housing and Urban Development’s Federal Labor Standards Provisions (HUD 4010), incorporated as Exhibit B-1 in Appendix E.

The Contractor acknowledges that work under this contract is subject to the payment of prevailing wages pursuant to Section 1770 and 1773 et seq. of the Labor Code of the State of California, the Director of Industrial Relations (State Prevailing Wages), and the U.S. Department of Housing and Urban Development’s Federal Labor Standards Provisions (Davis-Bacon Act Prevailing Wages). The Contractor to whom the contract is awarded, and all subcontractors under him, shall pay the higher of the Federal or State prevailing wage rate for any given classification employed in the performance of this contract.

The Federal wage decision is the one in effect ten (10) days prior to bid opening; it is available online at: https://www.wdol.gov/wdol/scafiles/davisbacon/ca.html. The State wage decision is available online at: https://www.dir.ca.gov/oprl/DPreWageDetermination.htm.

Regular City Council Meeting - May 15, 2025

Page 264 of 583 ends

10. Third Party Claims. City shall have full authority to compromise or otherwise settle any claim relating to the Agreement at any time. City shall timely notify Contractor of the receipt of any third- party claim relating to the Agreement. City shall be entitled to recover its reasonable costs incurred in providing this notice.

11. Antitrust Claims. Contractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the California Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Agreement. This assignment shall be made and become effective at the time the City tenders final payment to Contractor without further acknowledgment by the parties.

12. Claim Dispute Resolution. In the event of any dispute or controversy with the City over any matter whatsoever, the Contractor shall not cause any delay or cessation in or of work, but shall proceed with the performance of the work in dispute. The Contractor shall retain any and all rights provided that pertain to the resolution of disputes and protests between the parties. The disputed work will be categorized as an “unresolved dispute” and payment, if any, shall be as later determined by mutual agreement or a court of law. The Contractor shall keep accurate, detailed records of all disputed work, claims and other disputed matters

All claims arising out of or related to the Agreement or this Project, and the consideration and payment of such claims, are subject to the Government Claims Act (Government Code Section 810 et seq.) with regard to filing claims. All such claims are also subject to Public Contract Code Section 9204 and Public Contract Code Section 20104 et seq. (Article 1.5), where applicable. This Contract hereby incorporates those provisions as though fully set forth herein. Thus, the Contractor or any Subcontractor must file a claim in accordance with the Government Claims Act as a prerequisite to filing a construction claim in compliance with Section 9204 and Article 1.5 (if applicable), and must then adhere to Article 1.5 and Section 9204, as applicable, pursuant to the definition of “claim” as individually defined therein.

13. Debarred, Suspended or Ineligible Contractors . Contractor shall not be debarred throughout the duration of this Agreement. Contractor shall not perform work with debarred subcontractor pursuant to California Labor Code Section 1777.1 or 1777.7.

No contract shall be made to parties listed on the General Services Administration's List of Parties Excluded from Federal Procurement or Nonprocurement Programs in accordance with Executive Orders 12549 and 12689, “Debarment and Suspension,” as set forth at 24 CFR part 24. This list contains the names of parties debarred, suspended, or otherwise excluded by agencies, and contractors declared ineligible under statutory or regulatory authority other than Executive Order 12549. Contractors with awards that exceed the small purchase threshold shall provide the required certification regarding its exclusion status and that of its principal employees.

14. Conflicts of Interest. Contractor agrees not to accept any employment or representation during the term of this Agreement or within twelve (12) months after completion of the work under this Regular City Council Meeting - May 15, 2025

Page 265 of 583 ends

Agreement which is or may likely make Contractor “financially interested,” as provided in Government Code Section 1090 and 87100, in any decisions made by City on any matter in connection with which Contractor has been retained pursuant to this Agreement.

Contractor shall comply with the Conflict of Interest provisions, as applicable, in accordance with 2 CFR Part 200.112 and 24 CFR Part 570.611 and other federal Conflict of Interest requirements.

15. Trenching and Excavations. If the project involves trenching more than four (4) feet deep, Contractor shall promptly, and before the following conditions are disturbed, notify the City in writing of any:
material that Contractor believes may be hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; subsurface or latent physical conditions at the site differing from those indicated; or unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Agreement. The City shall promptly investigate the conditions, and if the City finds that the conditions do materially differ or do involve hazardous waste and cause a decrease or increase in Contractor’s cost of or the time required for performance of any part of the work, the City shall issue a change order.

16. Utilities. The City acknowledges its responsibilities under Government Code section 4215 and incorporates that section herein by this reference.

17. Location of Existing Elements . The methods used and costs involved to locate existing elements, points of connection and all construction methods are Contractor’s sole responsibility. Accuracy of information furnished, as to existing conditions, is not guaranteed by the City. Contractor, at its sole expense, must make all investigations necessary to determine locations of existing elements, which may include, without limitation, contacting U.S.A. Alert and other private underground locating firm(s), utilizing specialized locating equipment and/or hand trenching.

18. Wage and Hour Laws. The Contractor shall, as a penalty, forfeit twenty-five dollars ($25) for each worker employed in the execution of the Agreement for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of California Labor Code Section 1813. As provided for in California Labor Code Section 1810, a legal day’s work is 8 hours of labor in any one calendar day.

19. Audits and Records. The Contractor shall maintain and keep books and records on a current basis, recording all transactions pertaining to this Agreement in a form in accordance with generally acceptable accounting principles. The City or its representative shall have the option of inspecting and/or auditing all records and other written materials used by Contractor in preparing its billings to the City as a condition precedent to any payment to Contractor. Contractor will promptly furnish documents requested by the City. Additionally, Contractor shall be subject to State Auditor examination and audit at the request of the City or as part of any audit of the City, for a period of four (4) years after final payment under this Agreement.

20. Entire Agreement. This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between City and Contractor. This Agreement supersedes all prior oral or written negotiations, representations or agreements. This Agreement may not be modified or amended, nor any provision or breach waived, except in a writing signed by both parties which expressly refers to this Agreement.

Regular City Council Meeting - May 15, 2025

Page 266 of 583 ends

21. Termination. This Agreement may be canceled by the City at any time with or without cause without penalty upon thirty (30) days' written notice. In the event of termination without fault of Contractor, City shall pay Contractor for all services satisfactorily rendered prior to date of termination, and such payment shall be in full satisfaction of all services rendered hereunder.

22. Substitution of Securities. Pursuant to California Public Contract Code Section 22300, the Contractor will be permitted the substitution of securities for any monies withheld by the City of Jurupa Valley to ensure performance under this Agreement. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City of Jurupa Valley, or with a state or federally chartered bank as the escrow agent, who shall pay such monies to the Contractor. Securities eligible for substitution under this section shall include those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest- bearing demand deposit accounts, and standby letters of credit. The Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any dividends or interest thereon. The Contractor shall give the City written notice within thirty (30) days after this Agreement is awarded that it desires to substitute securities for money that would ordinarily be withheld. If the substituted securities are deposited into an escrow, the escrow shall be governed by a written escrow agreement in a form which is substantially similar to the agreement set forth in Section 22300, of the Public Contract Code.

23. Indemnification. To the fullest extent permitted by law, Contractor hereby agrees, at its sole cost and expense, to defend, protect, indemnify, and hold harmless the City of Jurupa Valley, and their officials, officers, attorneys, agents, employees, volunteers, successors, and assigns (collectively “Indemnitees”) from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith (collectively “Liabilities”), arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, incidental to, or related to any act, failure to act, error, or omission of Contractor or any of its officers, agents, servants, employees, subcontractors, materialmen, suppliers or their officers, agents, servants or employees, arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to this Agreement or the performance or failure to perform any term, provision, covenant, or condition of this Agreement, including this indemnity provision. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees Regular City Council Meeting - May 15, 2025

Page 267 of 583 ends

may have under the law. Payment is not required as a condition precedent to an Indemnitee's right to recover under this indemnity provision, and an entry of judgment against an Indemnitee shall be conclusive in favor of the Indemnitee's right to recover under this indemnity provi sion. Contractor shall pay Indemnitees for any attorney’s fees and costs incurred in enforcing this indemnification provision. Notwithstanding the foregoing, nothing in this instrument shall be construed to encompass (a) Indemnitees' sole negligence or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code 2782(a) or (b) the contracting public agency's active negligence to the limited extent that the underlying Agreement is subject to Civil Code 2782(b). This indemnity is effective without reference to the existence or applicability of any insurance coverages which may have been required under the Agreement or any additional insured endorsements which may extend to Indemnitees. The Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Contractor regardless of any prior, concurrent, or subsequent active or passive negligence by the Indemnitees.

24. Assignment. The parties do for themselves, their heirs, executors, administrators, successors and assigns agree to the full performance of all of the provisions herein contained. The Contractor may not, either voluntarily or by action of law, assign any obligation assumed by the Contractor hereunder without prior written consent of the City.

25. Attorney’s Fees. If any legal action or other proceeding, including action for declaratory relief, is brought for the enforcement of this Agreement or because of an alleged dispute, breach, default or misrepresentation in connection with this Agreement, the prevailing party shall be entitled to recover reasonable attorneys’ fees, experts’ fees, and other costs, in addition to any other relief to which the party may be entitled.

26. Worker’s Compensation Insurance. By my signature hereunder, as Contractor, I certify that I am aware of the Provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the Provisions of that code, and I will comply with such Provisions before commencing the performance of the work of this Agreement.

27. Effective Date. The effective date of this Agreement shall be the date of the Award of Contract by the City of Jurupa Valley.

28. Contractor’s License . Contractors are required by law to be licensed and regulated by the Contractors' State License Board. Any questions concerning a Contractor may be referred to the Registrar, Contractors’ State License Board, 3132 Bradshaw Road, Sacramento, CA 95826. Mailing address: P.O. Box 26000, Sacramento, CA 95826.

********** (SIGNATURE PAGE FOLLOWS) **********
Regular City Council Meeting - May 15, 2025

Page 268 of 583 ends

CITY OF JURUPA VALLEY,

Municipal Corporation (Name of Contractor)
License No./
BY: Classification:

Rod Butler, City Manager, City of Jurupa Valley
Expiration Date:

Date: Federal I.D. No.:

PRINT NAME:

SIGNATURE:

TITLE:

DATE:

Date

PRINT NAME:

SIGNATURE:

TITLE:

DATE:

Date

SIGNING INSTRUCTION TO THE CONTRACTOR:

All signatures on the Agreement on behalf of the Contractor must be acknowledged before a notary public.

General Partners must sign on behalf of the partnership.

NOTE: In the event that the contracting firm is a corporation, two (2) corporate officers having authority from the corporation MUST sign (two (2) signatures total). If the corporation has a corporate resolution stating that one person is authorized to sign on behalf of all officers, attach corporate resolution immediately following the notary certificates.Corporate Seal may be affixed hereto.

INTERNAL USE ONLY

ATTEST:

Evelyne Ssenkoloto, Interim City Clerk

APPROVED AS TO LEGAL FORM:

Peter Thorson, City Attorney

Date
RECOMMENDED FOR APPROVAL:

Paul Toor, P.E., Director of Public Work / City
Engineer
(if contract exceeds $5,000)
Regular City Council Meeting - May 15, 2025

Page 269 of 583 ends

BOND NO.

PREMIUM $

FAITHFUL PERFORMANCE BOND
(100% of Total Contract Amount)
PROJECT NO. 19108
Market Street Improvements from Rubidoux Blvd. to Via Cerro KNOW ALL MEN AND WOMEN BY THESE PRESENTS:

THAT WHEREAS, the City Council of the City of Jurupa Valley, State of California, known as "City," has awarded to Calmex Engineering, Inc as Principal hereinafter designated as "Contractor" and have entered into an Agreement whereby the Contractor agrees to construct or install and complete certain designated public improvements, which said Agreement, effective on the date signed by the City Manager/Mayor, and identified as Project No. 19108 is hereby referred to and made a part hereof; and WHEREAS, said Contractor under the terms of said Agreement is required to furnish a bond guaranteeing the faithful performance of said Agreement; NOW THEREFORE, we the undersigned Contractor and _____________________________________, as Surety, are held and firmly bound unto the City of Jurupa Valley, County of Riverside in the penal sum of Three Million Two-Hundred Twenty-Seven Thousand and Seventy-Five Cents ($3,227,000.75) lawful money of the United States, to be paid to the said City or its certain attorney, its successors and assigns; for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above bound Contractor, his or her or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in said Agreement and any alterations thereof made as therein provided, on his or her or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City of Jurupa Valley, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect. In the event suit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all costs incurred by the City in such suit, including a reasonable attorney fee to be fixed by the court.

The Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Agreement or to the work to be performed thereunder, or the Provisions accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or the Provisions.

********** (SIGNATURE PAGE FOLLOWS) **********
Regular City Council Meeting - May 15, 2025

Page 270 of 583 ends

BOND NO.

IN WITNESS WHEREOF, we have hereunto set our hands, and seals on this day

of 2025.

CONTRACTOR SURETY

Contractor
Name: Name:

Address: Address:

Telephone No.: Telephone No.:

Print Name: Print Name:

Attorney-in-Fact

Signature: Signature:

Approved as to Form this

day of 2025

Peter Thorson
City Attorney
City of Jurupa Valley

NOTE: This bond must be executed by both parties. Corporate seal may be affixed hereto. All signatures must be acknowledged before a notary public (attach acknowledgments). The attorney-in- fact for the corporate surety must be registered, as such, in at least one county in the State of California. (Attach one original Power of Attorney sheet for each bond).

Regular City Council Meeting - May 15, 2025

Page 271 of 583 ends

BOND NO.

PREMIUM $

LABOR AND MATERIALS PAYMENT BOND
(100% of Total Contract Amount)
Project No. 19108
Market Street Improvements from Rubidoux Blvd. to Via Cerro

KNOW ALL MEN AND WOMEN BY THESE PRESENTS
THAT WHEREAS, the City Council of the City of Jurupa Valley, State of California, known as "City", has awarded to Calmex Engineering, Inc as Principal hereinafter designated as "Contractor" and have entered into an Agreement whereby the Contractor agrees to construct or install and complete certain designated public improvements, which said Agreement, effective on the date signed by the City Manager/Mayor, and identified as Project No. 19108, is hereby referred to and made a part hereof; and WHEREAS, said Contractor under the terms of said Agreement is required to furnish a bond to secure the payment of claims of laborers, mechanics, materialmen, and other persons, as provided by law; NOW, THEREFORE, we the undersigned Contractor and ______ , as Surety are held and firmly bound unto the City of Jurupa Valley, County of Riverside, in the penal sum of Three Million Two-Hundred Twenty-Seven Thousand and Seventy-Five Cents ($3,227,000.75) lawful money of the United States, for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Contractor, his or her or its heirs, executors, administrator, successors or assigns, or subcontractors, shall fail to pay any of the persons described in the State of California Civil Code, Section 9100, or amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such claimant, or any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board from the wages of employees of the Contractor and his or her subcontractors, pursuant to Section 13020, of the Unemployment Insurance Code, with respect to such work and labor, that the Surety or Sureties herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In the event suit is brought upon this bond by the City or other person entitled to bring such an action and judgment is recovered, the Surety shall pay all costs incurred by the City in such suit, including a reasonable attorney fee to be fixed by the court.

The Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Agreement or to the work to be performed thereunder, or the Provisions accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or the Provisions.

Regular City Council Meeting - May 15, 2025

Page 272 of 583 ends

This bond shall inure to the benefit of any of the persons described in the State of California Civil Code Section 9100, to give a right of action to such persons or their assigns in any suit brought upon this bond. ********** (SIGNATURE PAGE FOLLOWS) **********
Regular City Council Meeting - May 15, 2025

Page 273 of 583 ends

BOND NO.

IN WITNESS WHEREOF, we have hereunto set our hands, and seals on this day

of 2025.

BIDDER SURETY

Contractor
Name: Name:

Address: Address:

Telephone No.: Telephone No.:

Print Name: Print Name:

Attorney-in-Fact

Signature: Signature:

Approved as to Form this

day of 2025

Peter Thorson
City Attorney
City of Jurupa Valley

NOTE: This bond must be executed by both parties. Corporate seal may be affixed hereto. All signatures must be acknowledged before a notary public (attach acknowledgments). The attorney-in- fact for the corporate surety must be registered, as such, in at least one county in the State of California. (Attach one original Power of Attorney sheet for each bond).

Regular City Council Meeting - May 15, 2025

Page 274 of 583 ends

City of Jurupa Valley
Public Works Department
Our proposed personnel are local
to the community and have been
residents for over 20 years. We
are excited to serve the City of
Jurupa Valley.

Request for Proposals
Construction Management and Inspection Services for
Market Street Improvements, Citywide Street
Rehabilitation Project, Pacific Avenue Phase 2 and 24/25 Slurry Seal Project
March 12, 2025
Regular City Council Meeting - May 15, 2025

Page 275 of 583 ends

TABLE OF CONTENTS
Table of Contents .......................................................................................... Not Included in Page Count Cover Letter ................................................................................................... Not Included in Page Count A. Organization/Company Profile ............................................................................................................. .1 B. Description of Services Provided by the Company ............................................................................ 10 C. Completed Proposer’s Signature Page ............................................................................. Appendix B D. Completed Non-Collusion Declaration .............................................................................. Appendix B E. Completed List of Three (s) References ................................................................................... Appendix B F. Photocopies of Company’s Licenses ........................................................................................ Appendix C G. Cost Proposal ............................................................................................................... Separate Submission H. Evidence of Insurability ................................................................................................................ Appendix D

APPENDICES
Appendix A ................................................................................................................................................. Resumes Appendix B ...................................................................................................................................................... Forms Appendix C ......................................................................................................................................... Certifications Appendix D ...................................................................................................................... Evidence of Insurability Regular City Council Meeting - May 15, 2025

Page 276 of 583 ends

COVER LETTER
March 12, 2025
Paul Toor, Public Works Director/City Engineer
City of Jurupa Valley, Public Works Department
8930 Limonite Avenue, Jurupa Valley, CA 92509
Subject: Proposal for Construction Management and Inspection Services for Market Street Improvements, Pacific Avenue Phase 2, Citywide Street Rehabilitation Project, and 24/25 Slurry Seal Project Dear Mr. Toor,
Z&K Consultants Inc. (Z&K) is pleased to submit our proposal to the City of Jurupa Valley for Construction Management and Inspection Services for the Market Street Improvements, Pacific Avenue Phase 2, Citywide Street Rehabilitation Project, and 24/25 Slur ry Seal Project. As a certified Disadvantaged Business Enterprise (DBE), Women’s Business Enterprise (WBE), and Small Business Enterprise (SBE) based in Southern California, Z&K specializes in Project Management, Construction Management, Construction Admin istration, Inspection, Pre - Construction Inspection, and Staff Augmentation Services. Our firm has successfully delivered numerous similar projects for local agencies and is fully committed to providing the City with high-quality construction management ser vices tailored to meet the unique needs of each project. Z&K has extensive experience successfully managing street rehabilitation projects, pavement management programs, ADA-compliant improvements, traffic signal modifications, storm drain improvements, and quality assurance. Our comprehensive understanding of municipal requirements, standards, and expectations ensures the successful execution of your projects.

Understanding of the Project Requirements | Our team has reviewed the project scope in detail, ensuring a comprehensive understanding of the four distinct projects. We recognize that each project presents unique challenges and demands a customized approach. The Market Street Improvements project will involve full -depth asphalt removal and reconstruction, curb and gutter replacement, ADA -compliant upgrades, and traffic signal modifications. Pacific Avenue Phase 2 will include asphalt removal and overlay, sid ewalk and ADA ramp construction, storm drain improvements, and signage/striping installation. The Citywide Street Rehabilitation Project will require pavement rehabilitation along various streets, including 2” grind and overlay, curb ramp upgrades, and man hole adjustments. Lastly, the 24/25 Citywide Slurry Seal Project will involve slurry sealing along numerous roadways, with comprehensive signage, striping, and ADA-compliant features. Our extensive experience equips us to proactively manage risks, maintain quality control, and collaborate effectively with stakeholders to ensure seamless project completion. Our ability to adapt to evolving site conditions, efficiently resolve challenges, and implement proactive solutions enables us to uphold the City’s expec tations for quality, safety, and budget control.

Proposed Scope of Work | Our proposed approach integrates strategic planning, technical expertise, and proactive communication to ensure each project’s success. Our comprehensive scope of work includes pre-construction, construction management, and post-construction services. During pre-construction, we will conduct constructability reviews, coordinate utility relocations, and facilitate stakeholder engagement to minimize potential disruptions. Throughout construction, our team will perform daily site inspections, monitor contractor compliance, track progress, and promptly address potential delays. Our proven ability to manage RFIs, submittals, and quality control measures ensures seamless coordination and adherence to project timelines. Post- construction se rvices include final inspections, punch list development, record drawings, and project closeout documentation, ensuring compliance with all contract requirements.

Experience of Firm and Personnel | Our experienced professionals have been carefully selected to align with the unique requirements and challenges of each project. This team has successfully worked together on multiple projects, fostering strong communication practices and seamless coordination. For this contract:

• Market Street Improvements: Anthony Flores will serve as the Construction Manager and Tom Dawson , CBO, ICC Cert. as the Senior Construction Inspector.
• Pacific Avenue Phase 2: Zack Faqih, PE, QSD/P, CBO, ICC Cert. will oversee this project as the Construction Manager, with Jimmy Martin, ACI, ICC Cert. as the Senior Construction Inspector. • Citywide Street Rehabilitation Project: Anthony Flores will serve as the Construction Manager, with Eddie Davalos as the Senior Construction Inspector.
• 24/25 Citywide Slurry Seal Project: Zack Faqih, PE , QSD/P, CBO, ICC Cert. will serve as the Construction Manager and Tom Verpooten, QSP, ICC Cert. as the Senior Construction Inspector.

This strategic alignment of personnel ensures that each project benefits from experienced leadership and technical expertise. Our personnel’s extensive knowledge of municipal requirements, Caltrans standards, and construction best practices positions our team to address complex project elements with confidence and precision.

Z&K has
successfully
delivered over 75
similar street
improvement
projects in the
past five years.

Regular City Council Meeting - May 15, 2025

Page 277 of 583 ends

Sincerely,

Crystal Fraire, PE
President (Principal-in-Charge)
17130 Van Buren Blvd. #122, Riverside, CA 92504
Phone. (951) 310-7470 | [email protected]

Zack Faqih, PE
Vice President
17130 Van Buren Blvd. #122, Riverside, CA 92504
Phone. (949) 637-5040 | [email protected]

Past Performance | Z&K has successfully delivered over 75 street improvement projects in the past five years, demonstrating our proven ability to manage similar scopes of work with exceptional results. Our experience includes extensive collaboration with municipal agencies, strict adherence to Caltrans standards, and effective management of federally funded projects. We have a track record of minimizing disruptions to the public, mitigating delays, and maintaining strong communication with stakeholders.

Z&K has extensive experience providing Construction Management and Inspection Services on similar projects to the City of Jurupa Valley’s Projects. Over the last 5 years, the Z&K team has provided these Services for the following similar contracts and projects:
» City of Alhambra, FY 19 -20, 20- 21, and 21 -22 Street Rehabilitation Projects
» City of Carson, Citywide Pavement Rehabilitation and
Slurry Seal Program
» City of Compton, Annual Residential Street Rehabilitation Project, Phases 1 & 2A
» City of Costa Mesa, Citywide Parkway Maintenance,
Street Rehabilitation, and Slurry Seal Project
» City of Irwindale, 2021-2022 Resurfacing Project
» City of Laguna Beach, Zones 5 & 11A Street Slurry Seal and Rehabilitation Project
» City of Manhattan Beach, Cycle 2 Street Improvement
Project
» City of Manhattan Beach, Slurry Seal Project North &
South Areas of Sand Section
» City of Moreno Valley, 801 -0081 Citywide Pavement
Rehabilitation Project
» City of Norwalk, CDBG Local Streets Rehabilitation
Project
» City of Rosemead, Walnut Grove Ave. Resurfacing
Project, Phase I
» City of San Bernardino, Street Rehabilitation Program » City of San Marino, Street Rehabilitation Program
» City of Torrance, Residential & Arterial Pavement
Improvement Project
COSTS | Our proposed rates are competitive, transparent, and based on time and materials. We have structured our fee schedule to deliver high -value services while maintaining flexibility to address project complexities. The Z&K Team is committed to optimizing project budgets by implementing strategic cost -control measures and minimizing change orders.

We will adhere to all prevailing wage requirements and ensure full compliance with labor standards.

The Z&K Team offers many unique strengths and advantages for this contract, including:
§ Thorough Project Knowledge – Our team has
conducted multiple site visits and reviewed project
documents, ensuring a deep understanding of existing
conditions and requirements.
§ Technical Expertise – Our expertise in construction
management, inspection, and stakeholder engagement
allows us to proactively address project challenges.
§ Certified Professionals – Our team holds required
licenses, including PE, ICC Cert., QSD/P and ACI.
§ Strong Track Record – Our extensive portfolio
demonstrates our ability to successfully manage
complex street improvement projects across Southern
California.
§ Efficiency in Project Budgeting – Our team excels in
managing project costs, optimizing resources, and
maintaining financial accountability to ensure projects are delivered within budget while meeting all compliance requirements.

We will provide weekly drone photos of the site during construction and a Weekly Newsletter summarizing the previous weeks activities, upcoming activities, and project progress for the internal use of the City.

We are committed to supporting the City of Jurupa Valley by ensuring these projects are executed with precision, quality, and accountability. I will serve as the contact person for all communications pertaining to the proposal for the full duration of the contract and I am authorized to obligate the firm to fulfill the commitments contained in the proposal. By signing below, I attest that all information submitted is true and correct. We acknowledge that the City issued Q&A Set No. 1 on 2/10/2025 and Q&A Set No. 2 on 2/26/2025. All contents of this Proposal shall remain valid for a period of not less than 120 days from the date of submittal. Our team is excited for this impactful project for the City of Jurupa Valley’s residents and businesses.

Regular City Council Meeting - May 15, 2025

Page 278 of 583 ends

A. ORGANIZATION/COMPANY PROFILE
Z&K Consultants, Inc. is a leading construction management and consulting firm dedicated to delivering high -quality services tailored to meet the unique needs of public and private sector clients. With a strong foundation built on years of industry experience, our firm specializes in managing infrastructure projects of varying scope and complexity, ensuring compliance with all regulations, and consistently exceeding client expectations. Our team’s expertise, coup led with a commitment to innovation and efficiency, allows us to provide reliable, results-driven solutions that contribute to the success of every project we undertake.

A. Business Name and Legal Business Status | Z&K Consultants, Inc., a corporation established in the State of California, is a full-service construction management and inspection firm.

B. Proof of Non-Profit Status | Not applicable; Z&K Consultants, Inc. operates as a for-profit entity.

C. Company Overview of Services or Activities Performed

1. History of the Firm | Z&K Consultants, Inc. was founded in 2009 with a mission to provide high-quality construction management and inspection services to public and private clients. Over the years, we have built a reputation for delivering infrastructure projects with precision, efficiency, and cost-effectiveness.

2. Years in Business | Operating under the name Z&K Consultants, Inc. for over 15 years, the firm has consistently provided construction management, inspection, and related services. Z&K Consultants, Inc. does not have any other business names.

3. Capital Improvement Projects (>$500,000) | Recent projects managed by Z&K Consultants are included in the Project Experience section of this proposal.

4. Company Hierarchy and Organizational Chart | The organizational structure of Z&K Consultants, Inc. is designed to ensure effective management and streamlined service delivery. At the top of the hierarchy is the Board of Directors/Owners, followed by the President/CEO, who oversees all operations. Supporting the President/CEO is the Senior Management Team, which includes the Vice President of Operations and Directors.

The organization is divided into two primary groups: the Engineering & Design Teams and the Project Management and Construction Management Group. Within the Engineering & Design Teams are the Technical and Support Staff, which includes engineers, estimators, contract administrators, office support personnel, and labor compliance specialists. This group also collaborates with Subconsultants who specialize in areas such as surveying and material testing. The Project Management and Construction Management Group includes Senior Program Managers, Senior Project Managers, and Senior Construction Managers, who lead various projects and provide oversight. Supporting them are Construction Managers and Project Managers, as well as Assistant Project Managers, Senior Construction Inspectors, and specialized roles such as SCADA managers, inspectors, and compliance-focused staff, including office engineers and Qualified SWPPP Developers/Practitioners (QSD/P).

This structure ensures clear roles and responsibilities, with expertise distributed across multiple levels to deliver high-quality project outcomes. An organizational chart outlining roles and responsibilities for this project is included in the proposal.

5. Resumes of Key Personnel | Resumes for the proposed team members are included in Appendix A, highlighting their qualifications, roles, and years of experience. The work under this contract will be performed primarily from our Riverside, CA office.

6. Company Size | Z&K Consultants employs a team of over 90 staff members, including key professionals directly allocated to construction management and inspection services , in addition to as -needed support staff . For this contract, we propose a dedicated team of personnel to ensure timely and effective service delivery.

7. Office Location and Staff Allocation | The primary office supporting this project is located in Riverside, CA which is staffed with construction managers, inspectors, and administrative personnel to handle all aspects of the work.

8. Key Staff Availability: Z&K Consultants, Inc. maintains a flexible and responsive staffing approach to ensure that the appropriate personnel are available to meet project demands. Our proposed team members have been carefully assigned to this project with sufficient bandwidth to dedicate their expertise, ensuring seamless project oversight and on-time deliverables. In the event additional resources are required, we have readily available staff who can provide immediate support to maintain project continuity and efficiency.

D. Controlling or Financial Interests | Z&K Consultants, Inc. does not hold controlling or financial interests in any other organization, nor is it owned or controlled by any other entity. Z&K Consultants, Inc. is a well-established firm with a proven track record in delivering high -quality construction management and inspection services. Our experienced team, robust organizational structure, and deep understanding of local project requirements position us to provide exceptional service tailored to the needs of the City of Jurupa Valley.

Regular City Council Meeting - May 15, 2025

Page 279 of 583 ends

ORGANIZATIONAL CHART
Z&K Consultants, Inc. has developed a project -specific organizational chart that ensures a clear chain of command to support all aspects of the project. Our key personnel — Senior Construction Managers, Senior Construction Inspectors, and Project/Contract Manager— will remain dedicated to their roles for the full contract duration, providing continuity and stability. By fostering close collaboration and clear communication, our team integrates seamlessly with City staff, contractors, and external agencies. This coordinated approach promotes efficiency, keeps the project on schedule and within budget, and aligns with the City’s objectives.

MARKET STREET IMPROVEMENTS

CITYWIDE STREET REHABILITATION PROJECT
Regular City Council Meeting - May 15, 2025

Page 280 of 583 ends

24/25 CITYWIDE SLURRY SEAL PROJECT
PACIFIC AVENUE PHASE 2
Z&K has carefully selected this "A-Team" and has committed our most qualified staff for the duration of the contract. The project team is 100% dedicated to this contract, and all proposed personnel will be available to perform the requested services as required by the City of Jurupa Valley. Our staff will deploy efforts in accordance with the project schedule and construction activities. Z&K guarantees that all assigned personnel will not be removed or replaced without prior written approval from the City of Jurupa Valley. We will reallocate staff hours, when possible, to achieve cost savings for the City.

By utilizing highly qualified, multi-disciplined team members, we are able to provide a cost -effective level of service while maintaining the highest industry standards.

Regular City Council Meeting - May 15, 2025

Page 281 of 583 ends

KEY PERSONNEL
Z&K Consultants, Inc. is proud to present a team of highly skilled professionals with extensive experience in construction management and inspection services. Each team member has been carefully selected to align their expertise with the unique scope and requirements of this contract. Our dedicated A-Team comprises highly qualified professionals committed to the successful delivery of this project. Each team member is fully available to perform the requested services, ensuring continuity throughout the contract.

With extensive experience in Construction Management and Inspection Services for street improvement projects, our team brings specialized expertise in managing schedules, coordinating utilities, and ensuring compliance with City standards. By aligning staff efforts with the project schedule, we optimize resources to meet milestones efficiently. When possible, we will reallocate hours to provide cost savings without compromising service quality. Our proposed personnel are local to the area, ensuring familiarity with City standards and community needs. This knowledge enhances collaboration with City staff, stakeholders, and contractors.
ü Delivering high -quality services and project
deliverables
ü Applying both technical expertise and practical
knowledge to project challenges
ü Ensuring strict adherence to quality and assurance
standards
ü Maintaining efficiency in both time and budget
ü Facilitating constant and open communication with
all stakeholders
ü Meeting and exceeding all licensing, training, and
experience requirements
By leveraging a multi -disciplined team of skilled professionals, Z&K Consultants provides a cost -effective service that maximizes value for the City of Jurupa Valley.

Senior Construction Managers
Anthony Flores | Anthony Flores brings comprehensive experience managing infrastructure projects with a focus on roadway rehabilitation, ADA -compliant upgrades, and traffic signal modifications. His expertise extends to overseeing complex construction schedules, coordinating with multiple stakeholders, and ensuring adherence to local, state, and federal standards. Anthony’s background includes successfully managing multimillion- dollar municipal infrastructure projects, including traffic signal installations, storm drain improvements, and pedestrian accessibility upgrades. His proactive leadership approach emphasizes early risk identification, cost control, and detailed scheduling to keep projects on track. Anthony’s extensive experience working with contractors, utility agencies, and city staff enables him to effectively resolve conflicts and minimize delays.

For this contract, Anthony will serve as the Senior Construction Manager for the Market Street Improvements and Citywide Street Rehabilitation Project. His leadership will be instrumental in ensuring quality construction, timely delivery, and effective coordination with City staff.

Zack Faqih, PE, QSD/P, CBO, ICC Cert. | With over 32 years of extensive experience in construction management, Zack Faqih is a recognized leader in managing complex infrastructure projects. His expertise includes traffic signal modifications, intersection improvements, pavement rehabilitation, and ADA-compliant construction. Zack’s ability to manage high -profile projects, navigate regulatory requirements, and deliver innovative solutions makes him a key asset to the Z&K team. Zack’s background includes managing more than 45 intersection improvement and traffic signal modification projects, ensuring compliance with Caltrans standards, the Local Assistance Procedures Manual (LAPM), and contract documents. His expertise in storm drain installations, traffic control planning, and stakeholder coordination ensures streamlined project execution.

For this contract, Zack will serve as the Senior Construction Manager for the Pacific Avenue Phase 2 and 24/25 Citywide Slurry Seal Project. His proactive communication and technical oversight will ensure all construction activities meet City expectations while minimizing disruptions to the community.

Senior Construction Inspectors
Tom Dawson, CBO, ICC Cert. | Tom Dawson offers over 28 years of extensive experience in construction inspection, specializing in public works projects, street rehabilitation, and traffic signal installations. His expertise includes pavement resurfacing, ADA ramp construction, utility coordination, and electrical work related to traffic signal systems. Tom’s technical proficiency ensures contractors adhere to project plans, specifications, and safety protocols. His experience with electrical improvements, including conduit installations and traffic signal modifications, ensures he can manage both standar d roadway construction and complex electrical upgrades with precision.

For this contract, Tom will serve as the Senior Construction Inspector for the Market Street Improvements Project , ensuring construction meets City standards and Caltrans specifications.

Regular City Council Meeting - May 15, 2025

Page 282 of 583 ends

Eddie Davalos | Eddie Davalos brings over 25 years of experience in public works inspection, construction management, and field oversight. With expertise in street rehabilitation, pavement resurfacing, ADA-compliant upgrades, and storm drain improvements, Eddie ensures every as pect of construction aligns with project specifications. His experience includes ensuring compliance with Caltrans standards, ADA accessibility requirements, and SWPPP regulations. Eddie’s strong background in field inspections, material testing, and contractor coordination ensures potential issues are identified early to maintain project schedules.

For this contract, Eddie will serve as the Senior Construction Inspector for the Citywide Street Rehabilitation Project, where his expertise will ensure pavement rehabilitation and ADA-compliance features are successfully completed.

Jimmy Martin, ACI, ICC Cert. | With over 27 years of experience in roadway infrastructure projects, Jimmy Martin is highly skilled in overseeing pavement rehabilitation, ADA-compliant improvements, and traffic signal upgrades. His expertise includes cold milling, asphalt paving, ARHM ov erlays, and pedestrian facility upgrades. Jimmy is known for his hands- on approach to inspections, ensuring construction activities are performed to the highest quality. He excels in identifying potential field issues early, offering solutions, and maintaining strict compliance with project plans. Jimmy’s proactive communication style ensures smooth collaboration between contractors, City staff, and utility providers.

For this contract, Jimmy will serve as the Senior Construction Inspector for the Pacific Avenue Phase 2 project, where his extensive experience in asphalt rehabilitation and ADA improvements will ensure the project is delivered successfully.

Tom Verpooten, QSP, ICC Cert. | With over 27 years of experience in construction inspection, Tom Verpooten has extensive expertise in pavement rehabilitation, slurry seal applications, and roadway surface treatments. Tom has successfully managed slurry seal projects involving pavement preparation, crack sealing, and final sealing applications. Tom’s ability to ensure precise execution of pavement treatments, coupled with his attention to detail and proactive communication style, ensures successful project completion. His technical expertise in traffic control and work zone safety further supports effective project delivery.

For this contract, Tom will serve as the Senior Construction Inspector for the 24/25 Citywide Slurry Seal Project, ensuring pavement treatments are applied efficiently and in compliance with project specifications.

Additional Key Personnel
Tommy Russell, Journeyman Electrician, Senior Traffic Signal/Electrical Specialist | Tommy brings over 25 years of specialized experience in electrical systems, traffic signal modifications, and intersection improvements. His expertise includes traffic loop detector installations, pedestrian countdown signal installations, and fiber-optic integration. Tommy has managed over 60 traffic signal and electrical projects, including Intelligent Transportation Systems (ITS) upgrades, ensuring smooth functionality and enhanced safety at intersections. His technical proficiency in conduit installations, electrical panel upgrades, and troubleshooting ensures that all electrical systems are properly installed and tested. He will oversee all traffic signal upgrades and electrical modifications to ensure compliance with City standards and Caltrans requirements.

For this contract, Tommy will serve as the Senior Traffic Signal/Electrical Specialist for the all projects. He will oversee all traffic signal upgrades and electrical modifications to ensure compliance with City standards and Caltrans requirements.

Brittany Duhn, PE, QSD/P, Contract Manager/Project Manager | Brittany Duhn is a licensed Professional Engineer and Qualified SWPPP Developer/Practitioner with over a decade of experience in project management, contract administration, and construction oversight. Brittany’s background includes managing complex infrastructure projects, overseeing regulatory compliance, and ensuring accu rate project documentation. Brittany excels in budget management, contract negotiations, and maintaining clear communication among project stakeholders. Her technical expertise in environmental compliance, SWPPP oversight, and risk management ensures that all project elements align with regulatory standards.

For this contract, Brittany will serve as the Contract Manager/Project Manager, ensuring accurate documentation, effective cost tracking, and seamless coordination across all four projects.

Subconsultants
Converse Consultants , Material Testing | In 1946, Professor Frederick J. Converse established Converse Consultants in Pasadena, California to provide the construction industry with geotechnical engineering and geological services. Converse is an employee -owned corporation, with 9 offices and more than 150 employees throughout the United States. Their professional and technical staff includes in-house geotechnical engineers, engineering geologists, environmental scientists, deputy inspectors, laboratory and field technicians, drafting/CAD specialists, and other specialized support personnel.

Resumes are included in Appendix A.

Regular City Council Meeting - May 15, 2025

Page 283 of 583 ends

PROJECT EXPERIENCE
Z&K Consultants, Inc. brings extensive experience in managing and delivering a broad range of roadway, intersection, and infrastructure improvement projects throughout Southern California.

Our proven expertise spans pavement rehabilitation, slurry sealing, ADA compliance upgrades, utility installations, and traffic signal modifications.

Our team excels in coordinating with stakeholders, addressing complex technical challenges, and delivering high-quality results on time and within budget. By combining innovative solutions with a strong focus on safety and efficiency, we minimize community disruptions while ensuring each project meets the highest standards of excellence. Below is a selection of recent projects that demonstrate our expertise and capabilities.

CITY OF ALHAMBRA, PEDESTRIAN COUNTDOWN SIGNAL HEAD INSTALLATION PROJECT | The City of Alhambra Pedestrian Countdown Signal Head Installation Project involved the installation of pedestrian countdown signal heads at various signalized intersections throughout the city. This federally funded project was administered under the HSIP Program (HSIPL-5130(022), Cycle 9 H9 -07-001) and required strict adherence to Caltrans Local Assistance Procedures Manual (LAPM) guidelines. The project aimed to enhance pedestrian safety by improving signal visibility and ensuring clearer countdown indicators for crossing pedestrians. By implementing these improvements at key intersections, the project contributed to increased public safety, reduced accidents, and improved traffic f low throughout the city. The successful completion of this project reflects the City's commitment to providing safer and more efficient roadways for its community.

CITY OF ALHAMBRA, FY 19-20, 20-21, AND 21 -22 STREET REHABILITATION PROJECTS |The City of Alhambra’s multi-year Street Rehabilitation Projects aimed to enhance roadway infrastructure across various local street segments over three fiscal years. These projects involved comprehensive pavement rehabilitation and concrete improvements for a total of 68 local street segments. Each project was designed to improve accessibility, enhance pavement conditions, and ensure compliance with ADA standards. The scope of work included pavement resurfacing, application of slurry seal treatments, varying depths of cold milling and asph alt overlay, and full -depth pavement removal and reconstruction. Concrete improvements involved the removal and replacement of broken and off-grade sidewalks, curb and gutter repairs, ADA curb ramp upgrades, and the reconstruction of concrete cross gutters and driveway aprons. Additional elements included construction staging, installation of loop detectors, adjustment of manhole and utility covers to grade, and the installation of PCC sidewalks.

CITY OF CARSON, CITYWIDE PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This project covers streets across all four districts within the City of Carson, focusing on essential infrastructure improvements for identified roadways, sidewalks, curb ramps, and related assets in need of repair. The scope of work includes traffic control, striping, pavement markings, cold milling, leveling course, asphalt rubber hot mix, installation of traffic loop detectors, concrete enhancements, and slurry sealing.

CITY OF CATHEDRAL CITY, TRAFFIC SIGNAL IMPROVEMENTS AT 12 INTERSECTIONS PROJECT | The Traffic Signal Improvements at 12 Intersections Project in the City of Cathedral City was designed to enhance traffic safety and improve pedestrian accessibility at key intersections throughout the city. Funded through the Highway Safety Improvement Program (HSIP), this project implemented several crucial upgrades to improve overall roadway safety. Key improvements included the installation of advanced dilemma zone detection systems to reduce accident risks at signalized intersec tions and the introduction of protected left-turn phases to improve turning safety and minimize conflicts with oncoming traffic. To further enhance pedestrian safety, pedestrian countdown signal heads were installed to provide clear and reliable crossing information. The project also involved the reconstruction of ADA-compliant curb ramps, ensuring improved accessibility for individuals with disabilities. These enhancements have successfully reduced traffic-related incidents, improved traffic flow, and increased pedestrian safety, contributing to a safer and more efficient transportation network in Cathedral City.

CITY OF CHINO, PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This Project includes street rehabilitation and slurry seal of various streets, including, Pipeline Ave from City Limits to City Limits, Chino Ave from City Limits to City Limits and Schaefer Ave from City Limits to City Limits. Scope of work includes pave ment improvements, street resurfacing, crack sealing, slurry seal, localized dig -outs, striping removal/install, and traffic loop detectors. Z&K provided preparation of submittal packages, scheduling, mark outs, meetings, cost control, reviewing RFIs, preparing change order proposals, permits, progress billings, subcontractor coordination, as -built drawings, and final walkthrough/closeout.

CITY OF COMPTON, ANNUAL RESIDENTIAL STREET REHABILITATION PROJECT, PHASES 1 & 2A | This project involved extensive roadway and pavement rehabilitation, along with significant infrastructure upgrades. The scope includes asphalt overlay, concrete improvements, and construction staging, especially at heavily traveled intersections. Additional work comprises traffic control, clearing and grubbing, SWPPP preparation, cold milling, and overlay applications. Pedestrian infrastructure improvements include PCC sidewalks, ADA- compliant enhancements, pedestrian crossings, and speed humps. Further components include the application of slurry seal, HMA pavement, ARHM overlay, AC base course, aggregate base, and full-depth AC slot pavement.

Z&K has
successfully
delivered over 75
similar street
improvement
projects in the
past five years.

Regular City Council Meeting - May 15, 2025

Page 284 of 583 ends

CITY OF CORONA, CORONA GREEN ALLEYS IMPROVEMENT
PROJECT | The Project aimed to transform selected alleyways in the City into environmentally friendly, functional, and sustainable public spaces. This project includes extensive surface improvements, installation of permeable pavements, and stormwater management features to enhance water quality and reduce urban runoff. Key elements of the work involve unclassified excavation, installation of aggregate base and porous asphalt, sidewalk and driveway construction, and the implementation of landscape elements like green infrastructure and solar lighting fixtures. The project incorporates drainage improvements and sustainable infrastructure elements to reduce the heat island effect, create safe pedestrian zones, and improve aesthetics.

CITY OF CORONA , SHERBORN STREET IMPROVEMENT PROJECT | The Sherborn Street Improvement Project in Corona enhanced local infrastructure with comprehensive street upgrades. The project included pavement rehabilitation, curb and gutter installations, and utility improvements, all aimed at boosting accessibility and safety. Landscaping and storm drain enhancements completed the revitalization of this essential roadway.

CITY OF COSTA MESA, CITYWIDE PARKWAY MAINTENANCE, STREET REHAB, AND SLURRY SEAL PROJECT | This citywide street improvement program in the City of Costa Mesa includes extensive street and intersection improvements, ADA ramp upgrades, and the installation of conduit and traffic signal enhancements. The project scope involves mobilization, constru ction of curb and gutters, sidewalks, driveway approaches, spandrels, cross gutters, and adjustments of manholes and utility covers. Additional work includes procurement and application of Type II slurry seal, crack sealing, installation of traffic signs, striping, pavement markings, traffic markers, speed humps, and the implementation of comprehensive traffic control measures.

CITY OF DOWNEY, WOODRUFF AVENUE PAVEMENT REHABILITATION PROJECT | The Woodruff Avenue Pavement Rehabilitation Project encompasses the rehabilitation of Woodruff Avenue between Firestone Boulevard and Washburn Road in the City of Downey, California. This includes extensive pavement reconstruction, involving the repair of failed pavement areas, cold milling of existing asphalt, and the installation of both asphalt concrete (AC) base course and asphalt rubber hot mix (ARHM) overlay. Additionally, the project addresses uplifted or damaged concrete infrastructure by replacing substandard curbs, gutters, sidewalks, and driveways to ensure safety and ADA compliance. Enhancements also include the installation of steel conduits and single -mode fiber optic cables for improved communication infrastructure. The work will be completed with adjustments to manhole and valve covers, updated traffic striping and markings, and a comprehensive traffic control plan. This project aims to improve road safety, durability, and overall accessibility for residents and commuters.

CITY OF EL SEGUNDO , EL SEGUNDO BOULEVARD IMPROVEMENT PROJECT, PW 23 -02 | The El Segundo Boulevard Improvement Project in the City of El Segundo enhances roadway conditions, traffic flow, and safety along key corridors. The project involves pavement rehabilitation on El Segundo Boulevard (Illinois Street to Isis Avenue) and Nash Street (El Segundo Boulevard to Imperial Highway) using a cement-stabilized base with an asphalt overlay, requiring traffic detours. Key improvements include new traffic signals, ADA-compliant curb ramps at multiple intersections, and upgraded bicycle infrastructure with 1,020 linear feet of cycle track, 27,450 linear feet of Class II bike lanes, and Class III bike route markings (Sharrows). These upgrades improve mobility, enhance safety, and create a more accessible transportation network for all road users.

CITY OF FONTANA , SIERRA AVENUE LANDSCAPE MEDIAN PROJECT | The Sierra Avenue Landscape Median Improvement Project (Bid No. DE-24-28-SB) involves the enhancement of the landscape and irrigation infrastructure along the Sierra Avenue corridor in Fontana, California, between Foothill Boulevard and Baseline Avenue. This project includes the installation of new hardscape and landscape features, along with an advanced irrigation system to ensure efficient water management and compliance with the City’s water conse rvation standards. Key components of the project include soil preparation, planting of drought -tolerant species, and installation of automated irrigation systems designed for water efficiency. This project also entails excavation, concrete curbing, and safety measures to protect the medians from vehicular traffic. The goal is to improve the aesthetic appeal, sustainability, and functionality of the medians along this major thoroughfare, providing a greener, more welcoming environment for residents and commuters.

CITY OF IRWINDALE, 2021-2022 RESURFACING PROJECT |The 2021-2022 Resurfacing Project in the City of Irwindale focused on extensive street resurfacing and infrastructure upgrades to improve roadway safety and functionality. The project included street resurfacing with cold milling and asphalt concrete (AC) overlay, construction of new curbs and gutters, and installation of PCC sidewalks. Key components also involved the installation and configuration of multiple traffic loop detectors, installation of city project signage, preservation of existing city survey monuments, adjustments of manhole and utility covers to grade, and the application of pavement markings and striping. Additional work involved mobilization, traffic control measures, preparation of NPDES compliance plans, coordination with local utilities, and geotechnical and materials testing.

Regular City Council Meeting - May 15, 2025

Page 285 of 583 ends

CITY OF LAGUNA BEACH, ZONES 5 & 11A STREET SLURRY SEAL AND REHABILITATION PROJECT | The Zones 5 & 11A Street Slurry Seal and Rehabilitation Project for the City of Laguna Beach involves comprehensive road surface improvements on El Toro Road (Zone 5) and the Diamond -Crestview neighborhoods (Zone 11A). The scope includes mobilization, clearing, and grubbing; saw-cutting and removing damaged asphalt concrete (A.C.) pavement; grinding and overlaying sections with new A.C. pavement; and applying both Type I and Type II slurry seals. Additional tasks involve the replacement of A.C. berms and curbs, installing Caltrans traffic loops, sealing pavement cracks, conducting stormwater pollution prevention measures, updating pavement striping and markings, and making necessary utility adjustments. These enhancements aim to improve roadway durability, safety, and aesthetics, ensuring smoother and safer travel for motorists and pedestrians alike.

CITY OF LAKE FOREST , STREET RESURFACING PROJECT | The Project involves the street resurfacing of Glenn Ranch Road from Portola Parkway to El Toro Road, as well as the slurry seal of and arterial slurry seal of Jeronimo and Muirlands from Los Alisos to Bake. Relevant project features include street resurfacing and re habilitation, application of slurry seal, grinding and overlay, cold milling, concrete improvements, ARHM pavement, AC base course, aggregate base, signing, striping, markings and pavement legends, removal and replacement of PCC curb ramps, removal and replacement of PCC sidewalk, bike lane traffic loops, Type E traffic loops, dig -outs, sewer and storm drain manhole adjustments, and water valves adjustments.

CITY OF MANHATTAN BEACH, CYCLE 2 STREET IMPROVEMENT PROJECT | The Cycle 2 Street Resurfacing Project in the City of Manhattan Beach is a Public Works initiative designed to improve roadway infrastructure across seven key street segments, totaling approximately 6,820 linear feet. The project encompasses 27th Street from Laurel Avenue to Pacific Avenue, Agnes Road from 29th Street to Marine Avenue, Flournoy Road from Ardmore Avenue to 19th Street, 29th Street from Blanche Road to Agnes Road, Flournoy Drive from Valley Drive to 33rd Street, Marine Avenue from Blanche Road to Valley Drive, and 14th Street from Pacific Avenue to Laurel Avenue. For five of these segments, the scope includes constructing rolled curbs and gutters, pavement removal, and new pavement installation. The remaining two segments involve milling the existing pavement surface and applying a new asphalt rubber surface course over pavement fabric.

CITY OF MANHATTAN BEACH, SLURRY SEAL PROJECT NORTH & SOUTH AREAS OF SAND SECTION | The Project involves comprehensive pavement and surface improvements. The scope of work includes striping and paint removal, full- depth asphalt removal and replacement, asphalt patchwork, crack sealing, slurry sealing, sealcoat application, and installation of signage and striping. Additional features of the project include the construction of decorative crosswalks, pressure washing for paint removal at playgrounds, and updated pavement markings in the playground areas within the north section of the Sand Section area.

CITY OF MANHATTAN BEACH, ADVANCED TRANSPORTATION SYSTEM (MBATS) PROJECT |The project expands the South Bay Fiber Network, implementing a fiber-optic infrastructure that will enhance traffic signal synchronization along Manhattan Beach’s main corridors. This upgrade enables advanced traffic management capabilities, such as real -time monitoring, dynamic signal timing, and future support for autonomous vehicle communication. The project is designed to relieve congestion, optimize traffic flow, and increase the responsiveness of traffic systems throughout the city.

CITY OF MANHATTAN BEACH, MANHATTAN BEACH BOULEVARD IMPROVEMENTS PROJECT | The Manhattan Beach Boulevard Improvements Project addressed critical safety and traffic flow concerns at the intersection of Manhattan Beach Boulevard and Pacific Avenue. The project focused on improving traffic efficiency by reconfiguring the intersectio n to optimize vehicle movement and reduce congestion. With significant westbound traffic demand and limited merging space creating frequent delays and sudden braking, the project int roduced key upgrades to enhance safety and flow.

Improvements included the installation of new traffic signal systems designed to support dedicated left-turn pockets in both directions, effectively reducing peak-hour congestion. Additionally, the redesigned intersection improved merging distances, allowing for smoother transitions and minimizing abrupt stops. These enhancements were designed to improve accessibility, safety, and long-term functionality for residents, commuters, and visitors.

CITY OF MORENO VALLEY, 801-0081 CITYWIDE PAVEMENT REHABILITATION PROJECT | This project is a citywide rehabilitation of Moreno Valley City streets, involving various pavement and infrastructure improvements. The scope includes cold milling to a depth of 1.5 inches, placing a 1.5 -inch asphalt rubber hot mix (ARHM) overlay, curb ramp installations, curb and gutter replacements, cross gutters, and spandrels. It also includes full -depth asphalt removal and replacement, installation of traffic striping and markers, traffic signage, adjustments of existing utility manholes, and asphalt concrete overlay.

CITY OF NORWALK, CDBG LOCAL STREETS REHABILITATION PROJECT | The Local Streets Rehabilitation Project in the City of Norwalk, funded by the Community Development Block Grant (CDBG), focused on enhancing roadway and infrastructure conditions across designated local streets. The project scope included improvements to concrete features such as cross gutters, curbs and gutters, ADA-compliant curb ramps, and intersection upgrades. Additional work involved traffic signal enhancements, installation of bike lanes, coordination with underground utilities, conduit installation, and comprehensive pavement rehabilitation. The project emphasized safety and accessibility improvements, compliance with environmental standards, and efficient coordination with public utilities to support sustainable infrastructure development.

Regular City Council Meeting - May 15, 2025

Page 286 of 583 ends

CITY OF PALM SPRINGS, HSIP CYCLE 9 TRAFFIC SIGNAL MODIFICATIONS (NINE INTERSECTIONS) PROJECT | The HSIP Cycle 9 Traffic Signal Modifications Project in the City of Palm Springs was initiated to enhance traffic safety and pedestrian accessibility at nine signalized intersections across the city. This federally funded project introduced several critical improvements to enhance roadway safety and improve intersection functionality. Key upgrades included the modification of existing traffic signals to improve v isibility, installation of advanced dilemma zone detection systems to reduce potential collisions, and the addition of protected left -turn phases to improve turning safety. To further enhance pedestrian safety, pedestrian countdown signal heads were installed to provide clear crossing information. The project also included the reconstruction of ADA-compliant curb ramps, ensuring improved accessibility for individuals with disabilities.

These enhancements collectively improve traffic flow, reduce accident risks, and create safer and more accessible roadways for Palm Springs residents and visitors.

CITY OF ROSEMEAD, WALNUT GROVE AVE. RESURFACING PROJECT PHASE I | This project involved street resurfacing and widening of Walnut Grove Ave., from Marshall St. to Grand Ave. in the City of Rosemead. Improvements included roadway widening, intersection improvement, waterline installation, pavement improvements, ADA improvements, sidewalk repairs, traffic signal modification, storm drain improvements, sewer main improvements, and bike lanes.

CITY OF SAN BERNARDINO , STREET REHABILITATION PROGRAM (30+ MAJOR CITY STREETS) | The project encompasses extensive pavement and infrastructure improvements for over 30 major streets and multiple intersections across the city. This ongoing project includes roadway and pavement rehabilitation, concrete improvements, installation of cross gutters, curb and gutter replacement, curb ramps, ADA upgrades, and storm drain and pipeline relocations. Additional work involves traffic signal enhancements, comprehensive traffic control, full-depth asphalt removal and replacement, cold milling and AC overlay, slurry seal applications, PCC sidewalk installation, and replacement of existing PCC driveways, driveway approaches, curb ramps, retaining curbs, a 3-foot-high retaining wall, parkway culverts, and cross gutters.

CITY OF SAN MARINO, STREET REHABILITATION PROGRAM
PHASE 1 & 2 | The project included a wide range of improvements, such as roadway and pavement reconstruction, concrete enhancements, installation of cross gutters, curbs and gutters, curb ramps, and ADA - compliant upgrades. The work also covered cold milling of asphalt concrete pavement followed by resurfacing with hot mix asphalt (HMA) and asphalt rubber hot mix (ARHM). Additional tasks involved clearing and grubbing, localized pavement repairs, and replacement of impacted traffic striping, pavement markings, legends, loop detectors, and curb painting. Further improvements included driveways and driveway approaches, installation of speed humps, adjustment of utility frames and grates, inspection and replacement of sewer manholes, water valves, water meters, and storm drain manholes, as well as SWPPP preparation and implementation of temporary construction BMPs.

CITY OF TORRANCE, RESIDENTIAL & ARTERIAL PAVEMENT IMPROVEMENT PROJECT, I-159/I-139 | This project involves comprehensive pavement improvements across a residential neighborhood and four arterial streets in the City of Torrance. The scope of work includes roadway and pavement rehabilitation, concrete improvements, installation of cross gutters, curb and gutter replacement, curb ramp and ADA improvements, and clearing and grubbing. Additional work includes applying slurry seal, cold milling with asphalt concr ete (AC) overlay, removal and disposal of existing pavement, and localized pavement repairs. Additional improvements cover tree removal and replacement, asphalt berm replacement, AC base course, installation of PCC (Portland Cement Concrete) sidewalks, PCC driveways and approaches, access ramps, pavement markings and striping on both concrete and asphalt surfaces, installation of raised pavement markers, and City project signage. Specialty elements include the installation of loop detectors, bicycle loop detectors, reconfiguration of sewer piping, water valves, water meters, storm drain manholes, and related features.

CITY OF TORRANCE, ANZA/VISTA MONTANA/PCH TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS | The Anza/Vista Montana/PCH Traffic Signal and Intersection Improvements Project in the City of Torrance was designed to enhance traffic flow, improve safety, and expand roadway capacity at a heavily trafficked intersection. Key upgrades included modernizing the traffic signal systems, installing pedestrian countdown signals, and integrating fiber optic communication equipment to improve signal coordination. To reduce congestion, the project introduced dual left-turn lanes, reconfigured travel lanes, and widened the roadway to accommodate increased traffic volumes. Additional improvements involved extending left -turn lanes, relocating utilities such as fire hydrants and storm drains, and up grading stormwater drainage systems. The project also featured the installation of ADA-compliant curb ramps and enhanced street lighting to improve accessibility and pedestrian safety.

Our past performance demonstrates our expertise in street rehabilitation, traffic signal improvements, ADA upgrades, and municipal infrastructure enhancements, making us well-equipped to support the Project. With a highly skilled team, proactive management approach, and commitment to delivering projects on time and within budget, we are confident in our ability to provide exceptional construction management and inspection services. We look forward to the opportunity to bring our experience and dedication to this important project, ensuring its successful completion for the City and its residents.

Regular City Council Meeting - May 15, 2025

Page 287 of 583 ends

B. DESCRIPTION OF SERVICES PROVIDED BY THE COMPANY
The City of Jurupa Valley is dedicated to investing in its infrastructure to improve the quality, safety, and longevity of it s transportation network. As one of the fastest -growing communities in the region, the City has identified critical projects designed to address deteriorating roadway conditions, improve pedestrian access, and ensure safer, more efficient travel routes for motorists and cyclists alike. These projects reflect the City's approach to maintaining public infrastructure, improving accessibility, and enhancing connectivity for all users. Through careful planning, strategic investments, and community engagement, these initiatives are designed to provide lasting benefits while minimizing d isruptions during construction. Each project reflects the City’s commitment to responsible growth and sustainable infrastructure development.

Market Street Improvements Project | The Market Street Improvements Project is a vital investment by the City of Jurupa Valley to improve roadway infrastructure, enhance public safety, and ensure long-term resilience for this important corridor.

The project was bid on March 6, 2025, and is de signed to revitalize Market Street between State Route 60 and Rubidoux Boulevard through comprehensive roadway rehabilitation, ADA improvements, and upgraded traffic control systems.

Project Understanding: The Market Street Improvements Project is a critical infrastructure upgrade for the City of Jurupa Valley, designed to enhance roadway conditions, improve pedestrian access, and upgrade traffic control systems to ensure safer, more efficient travel along t his key corridor. The project focuses on Market Street between State Route 60 and Rubidoux Boulevard and aims to address roadway deterioration, improve ADA accessibility, and enhance traffic signal functionality.

Scope of Work:
• Pavement Rehabilitation: Full-depth asphalt removal
and reconstruction to address extensive cracking, rutting, and surface failures. The project incorporates hot mix
asphalt (HMA) to improve road durability.
• ADA Compliance Improvements: Construction of curb
ramps, replacement of non -compliant sidewalks, and
improved crosswalk markings to enhance pedestrian
access.
• Traffic Signal Modifications: Upgrades to existing traffic signals, pedestrian countdown signals, and the installation of fiber optic communication systems for improved
synchronization.
• Utility Adjustments: Adjustment of manhole covers and utility/water vaults to match the improved pavement grade. • Storm Drain Enhancements: Modifications to drainage
infrastructure to improve water flow, reduce localized
flooding risks, and protect the newly paved surface.

Key Features and Community Benefits:
• Enhanced roadway durability with improved pavement
structure and materials.
• Improved pedestrian safety through ADA- compliant
upgrades and enhanced signal systems.
• Efficient traffic flow enabled by updated signals and synchronization.
• Reduced flood risks through improved drainage systems.

Technical and Logistical Considerations: To minimize
disruptions, construction will be completed in multiple phases, ensuring safe pedestrian and vehicle movement
throughout the project area. Clear signage, designated
detour routes, and phased closures will be implemented to maintain access for residents and businesses. Our team will conduct proactive outreach with local businesses, schools, and residents to ensure clear communication on project
milestones, potential impacts, and alternate travel routes.

Pacific Avenue Phase 2 Improvements | The Pacific Avenue Phase 2 Improvements Project is a significant component of Jurupa Valley's ongoing infrastructure enhancement efforts. This project is designed to address deteriorating roadway conditions while implementing accessibility upgrades that improve safety and connectivity throughout the community.

Project Understanding: The Pacific Avenue Phase 2 Project is a comprehensive street improvement effort designed to improve roadway conditions, pedestrian accessibility, and public safety. The project targets Pacific Avenue from Rubidoux Boulevard to Mission Boulevard and aims to address aging infrastructure while enhancing multimodal transportation capabilities.

Scope of Work

• Asphalt Pavement Removal and Overlay: Includes full-
depth pavement reconstruction, localized dig -outs, and the application of new asphalt to restore surface quality. • Curb Ramp and Sidewalk Construction: Repla cement
of non-compliant curb ramps, sidewalks, and crosswalks
to meet ADA standards and improve pedestrian access.
• Drainage System Improvements: Enhanced drainage
structures, including new catch basins, storm drain pipe installation, and curb and gutter enhancements to mitigate flooding.
• Signage and Striping: Installation of updated pavement markings, signage, and crosswalk enhancements to
improve driver visibility and pedestrian safety.

Key Features and Community Benefits

• Safer pedestrian access through improved crosswalks
and ADA-compliant features.
• Enhanced roadway conditions, reducing wear and tear for local motorists.
• Improved drainage reduces the risk of standing water and enhances stormwater management.

Technical and Logistical Considerations : To ensure
minimal disruption to the community, the project will follow a staged construction approach with clear signage and
alternate access points maintained throughout the process.

Our team will also implement a communication plan to
provide updates on construction progress, schedule
changes, and detour information, ensuring the public
remains informed and prepared during the project.

Regular City Council Meeting - May 15, 2025

Page 288 of 583 ends

Citywi
de Street Rehabilitation Project | The Citywide Street Rehabilitation Project is a strategic effort by the City of Jurupa Valley to address deteriorating road conditions throughout residential and arterial streets. This project will enhance driving conditions, improve accessibility, and support sustainable infrastructure improvements across the community.

Project Understanding: This citywide rehabilitation initiative addresses aging pavement conditions across key streets in Jurupa Valley. The project is designed to extend roadway lifespans, improve ride quality, and ensure ADA compliance across various residential and commercial corridors.

Scope of Work
• Pavement Rehabilitation: 2- inch grind and overlay
operations to improve surface conditions on designated
streets.
• ADA Compliance Improvements: Curb ramp upgrades,
sidewalk repairs, and improved pedestrian crossing
features.
• Manhole and Utility Adjustments: Raising manholes,
valve covers, and utility vaults to match the new pavement grade.
• Signage and Striping: Comprehensive updates to traffic markings, including bike lanes and pedestrian crossings, to improve road safety.

Key Features and Community Benefits
• Enhanced roadway durability reduces future maintenance costs.
• Improved pedestrian mobility through upgraded ADA
features.
• Greater roadway safety achieved through improved
pavement markings and signal adjustments.

Technical and Logistical Considerations: The project will require coordination with utility providers, public agencies, and local stakeholders to ensure a streamlined process. Our team will implement proactive communication strategies to keep residents, businesses, and commuters informed of
upcoming construction schedules and alternate routes.
24/25 Slurry Seal Project | As part of the City’s commitment to proactive pavement maintenance, the 24/25 Slurry Seal Project focuses on preserving the condition of numerous streets throughout Jurupa Valley. This preventive maintenance initiative ensures the City’s infrastructure remains safe, reliable, and aesthetically improved.

Project Understanding:

The 24/25 Slurry Seal Project is a proactive maintenance effort designed to extend the life of Jurupa Valley's road network by applying a protective seal over designated streets. This project targets numerous residential and arterial streets throughout the city.

Scope of Work

• Slurry Seal Application: Application of Type II slurry seal to enhance roadway durability and reduce surface wear.
• Crack Sealing and Pothole Repairs: Surface-level
repairs to stabilize pavement before sealant application. • Signage and Striping: Replacement of faded or worn
pavement markings to ensure clear lane delineation.
• ADA Enhancements: Installation of new curb ramps
where required to meet current accessibility standards.

Key Features and Community Benefits
• Enhanced roadway surface conditions for improved
driving comfort.
• Cost-effective preventive maintenance that extends
pavement life.
• Improved safety through updated pavement markings and signage.

Technical and Logistical Considerations: The project will be scheduled to minimize disruption to residents,
businesses, and local traffic patterns.

Funding and Project Timeline | The Market Street Improvements Project is estimated to take approximately 120 working days to complete, ensuring all roadway rehabilitation, ADA improvements, and traffic signal modifications are properly implemented. The Pacific Avenue Phase 2 Improvements Project is expected to span 120 working days, addressing asphalt rehabilitation, curb ramps, and drainage improvements. The Citywide Street Rehabilitation Project has an anticipated duration of 90 working days, focusing on pavement upgrades, ADA enhancements, and traffic safety improvements. Lastly, the 24/25 Slurry Seal Project is estimated to take 75 working days to complete, focusing on preventative maintenance to extend roadway longevity and improve surface conditions. Funding for the City of Jurupa Valley’s Market Street Improvements, Pacific Avenue Phase 2 Improvements, Citywide Street Rehabilitation, and 24/25 Slurry Seal Project is provided entirely through local funding sources. This strategic allocation of resources reflects the City’s ongoing commitment to fiscal responsibility, ensuring infrastructure enhancements align with long-term financial sustainability goals.

Key Features and Community Benefits | This project is more than just roadway repairs; it’s a comprehensive effort to enhance the community’s transportation experience. Key benefits include:
• Enhanced Safety: Improved road conditions reduce the risk of accidents caused by uneven surfaces, potholes, and poor drainage.
• Increased Accessibility: Upgrades to ADA-compliant curb ramps and pedestrian pathways foster inclusivity and ease of mobility for all residents.
• Economic Growth: By improving the functionality and appearance of roadways, the project supports local businesses and encourages economic development.
• Traffic Efficiency: Traffic signal modifications and pavement markings improve vehicle flow and minimize delays. • Environmental Sustainability : Incorporating sustainable construction practices, such as recycling asphalt and implementing stormwater management systems, reduces the project’s environmental footprint.

Regular City Council Meeting - May 15, 2025

Page 289 of 583 ends

MANAGEMENT PLAN
We have successfully utilized CM Agency delivery on a host of projects. Through this experience we have developed management procedures that promote collaboration and teamwork, improve quality, and maximize the value of the City’s projects. Z&K’s past performance with Cities, Counties, and other agencies show our remarkable ability to control costs, guarantee great quality of work, and meet all project deadlines.

Management Approach | Z&K Consultants, Inc. provides proven professional construction management techniques to ensure the safe construction of a quality project completed on time and within budget.

Z&K accomplished this by establishing the systems, policies, and procedures necessary to ensure adequate project controls are in place.

The Construction Manager must ensure all parties understand the basic responsibilities and interrelationships of all team member such as the Owner (both project management and op erations), the Design Engineer, the Contractor, the construction management team, and the subconsultants. Additionally, a good Construction Manager must have the knowledge and experience to effectively understand the interrelationships between the key management components of time, information, cost, and quality. Decision making, including obtaining sufficient information to make reasoned decisions, is the key element leading to a successful project.

Time Management | Effective time management relies on accurate scheduling to track critical timelines and resource allocation. Z&K will review the Contractor’s baseline schedule to confirm its accuracy and feasibility, ensuring activity durations and logic ties are reasonable. We will also monitor for float suppression to protect schedule flexibility. Throughout the project, Z&K will document daily progress and compare the Contractor’s three -week look-ahead schedule with the baseline to identify potential delays early. This proactive approach helps maintain project momentum and ensures the Contractor effectively manages the schedule.

Information Management | Efficient information flow is vital for project success. Z&K will manage and distribute project information, including contracts, meeting minutes, drawings, RFIs, pay requests, and inspection reports. Our structured communication framework begins with a comprehensive kick-off meeting to establish roles and communication protocols.

Weekly construction meetings will ensure ongoing issues are addressed, with topics such as safety, progress updates, RFIs, and schedule reviews discussed. Unresolved issues will be tracked until resolved, ensuring clear communication and accountability throughout the project.

Funding Management | Z&K will ensure that the City has all necessary information to comply with funding requirements.

Our team is experienced in complying with funding reporting and filing requirements. We pay close attention to these requirements and deadlines so that project funding remains unaffected and so that file audits are conducted quickly and efficiently. Proper Project documentation is key in any audits.

Cost Management | Z&K will take the lead to ensure a cost management system is properly implemented and maintained.

Z&K’s cost management role will be in two parts. The first is to track the value of the completed work to ensure accurate and detailed monthly progress billing by the contractor. Secondly, Z&K will proactively manage the change order process.

The monthly progress billing may be tied to the construction schedule. A cost loaded critical path method (CPM) schedule is a valuable management tool. Each month, the Construction Inspector will review and approve the CPM.

Codes & Procedures Management | Z&K has a strong knowledge of the City, County, State, and Federal codes and procedures that are required to deliver a successful project. Z&K will ensure that all codes and procedures are properly followed for the City’s Project. Some of the requirements are as follows:
o Project Construction Documents
o City Standards and Design Manuals
o Caltrans Construction Manual
o American Water Works Association
(AWWA)
o American Public Works Association
(APWA)
o Best Industry Practices
o Manual of Uniform Traffic Control
Devices (MUTCD)
o Work Area Traffic Control Handbook
(WATCH) Manual
o Construction Traffic Control and
Safety
o Shoring, Trenching, and Excavation
Safety
o WPCP Compliance
o California Building Code
o California Plumbing Code
o California Mechanical Code
o California Electrical Code
o California Building Energy Efficiency
Standards
o Title 24, Part 2, 2.5, 3, 4, 5, 6, 11
o California Fire Code
o California Residential Code
o California Green Building Code
o California Disabled Regulations
o City Codes & Ordinances
o City Grading Code & Manual
o Caltrans Standards, Specifications,
and Procedures
o Caltrans Safety Manual
o OSHA Construction Safety Orders
o 10/30-hr OSHA Training
Certification
o Local Assistance Procedures
Manual (LAPM)
o State and Federal Building Codes
(Site Accessibility)
o County Procedures and Guidelines
o Project Safety Plan (PSP)
o Site Health and Safety Plan
o Activity Hazard Analysis (AHA)
Regular City Council Meeting - May 15, 2025

Page 290 of 583 ends

WORK PLAN
The following work plan outlines our approach to executing the City’s Projects. This plan is designed to ensure efficiency, quality, and compliance with project specifications while minimizing disruptions to the community. The work will be structured in phases, with each phase involving specific tasks and deliverables.

Phase 1: Pre-Construction Planning | Establish the foundation for a successful project by coordinating with stakeholders, reviewing project details, and identifying potential challenges. Key Activities include:
• Kickoff Meeting: Meet with City staff, utility providers, and other stakeholders to discuss project goals, timelines, and communication protocols. Establish points of contact for smooth coordination. • Review of Plans and Specifications: Conduct a thorough review of project documents to identify potential discrepancies or challenges. Perform constructability reviews to optimize project delivery. • Site Assessments: Inspect project location s to confirm field conditions align with design plans. Identify critical areas requiring specialized attention, such as high-traffic zones or intersections near schools. • Traffic Control Planning: Develop a detailed traffic management plan to ensure public safety and minimize disruptions. • Permitting and Utility Coordination : Coordinate with utility providers to schedule adjustments to water valves, manholes, and other infrastructure. Secure necessary permits and clearances.

Phase 2: Mobilization | Prepare the project sites for construction activities. Key Activities include:
• Staging and Logistics: Establish staging areas for equipment/materials to minimize the footprint of operations. • Public Notifications: Distribute notifications to residents, businesses, and stakeholders regarding project schedules, detours, and anticipated disruptions.
• Safety Preparations: Deploy temporary traffic control measures, including signage, barriers, and flaggers, to ensure the safety of workers and the public.

Phase 3: Construction Management & Inspection | Oversee the street improvement and associated infrastructure improvements efficiently and in compliance with project specifications. Key Construction Activities include:
• Site Preparation : Clear and grub as necessary to prepare sites for construction. Perform grading and drainage adjustments to ensure proper runoff management.
• Pavement Rehabilitation: Conduct grind-and-overlay operations, cold milling, and full -depth pavement reconstruction where required. Apply slurry seals to extend pavement life and improve surface conditions. • ADA Compliance Upgrades: Install or upgrade curb ramps and sidewalks to meet ADA standards. • Utility Adjustments: Adjust manholes, water valves, and other utilities to align with the finished pavement surface. • Traffic Signal and Loop Detector Modifications: Install and test traffic loop detectors and make necessary signal modifications.
• Inspection and Quality Control: Perform routine inspections to verify compliance with project specifications and maintain quality assurance.

Phase 4: Close-Out | Ensure the project is completed to the City’s satisfaction and all necessary documentation is provided.

Key Activities include:
• Punch List Completion: Identify and address any remaining deficiencies before final acceptance. • Final Inspections: Conduct comprehensive inspections with City representatives to confirm project compliance. • Documentation and Handover: Submit as-built drawings, testing reports, and close-out documentation. Provide a final project summary, including lessons learned and recommendations for future projects.

Reporting and Communication | Throughout all phases, we will maintain consistent communication with the City and other stakeholders. Our work reporting mechanisms include:
• Daily Progress Reports: Documentation of work completed, weather conditions, workforce levels, and equipment usage. • Weekly Progress Meetings: Updates on milestones, schedule adherence, and issue resolution. • Monthly Summary Reports: Comprehensive overviews of project progress, costs, and compliance with specifications.

Our comprehensive work plan reflects our commitment to delivering the Projects efficiently, on schedule, and to the highest standards of quality. By combining meticulous pre -construction planning, precise execution during construction, and thorough close-out procedures, we will ensure seamless project delivery that aligns with the City’s goals. In the pre - construction phase, we will conduct detailed assessments, review plans for constructability, and coordinate closely with stakeholders to establish a clear schedule with defined milestones. During construction, our team will implement rigorous quality control measures, conduct frequent inspections, and proactively resolve issues to maintain progress and minimize disruptions. For project close -out, we will manage final inspections, address punch list items, and provide organized documentation to support the City’s maintenance efforts.

Through proactive communication, diligent oversight, and collaboration with all stakeholders, we will deliver successful outcomes that leave a lasting positive impact on the City’s infrastructure.

Regular City Council Meeting - May 15, 2025

Page 291 of 583 ends

Implement Project
Management Plan
• Develop Construction
Management Procedures
Manual (CMPM) Project Kick-Off Meeting with
Department Staff
(Project Manager)

Review Project Documents
• Specifications
• Plans
• Manuals
• Permits
• Documentation
Requirements
Prepare Pre-Construction
Meeting
• CM Agenda
• Daily Report Form
Approval
• Permit Requirements
• Work Requirements
• Work Restrictions
• Liquidated Damages
• Superintendence
• Critical Path Submittals
• CPM Schedule
• Milestones
• Facility Shutdowns
• Safety
Pre-Construction
Documentation
• Digital Documentation
• Digital Video
Pre-Construction Phase
Z&K Consultants, Inc. proposes to provide the scope of services as set forth in the RFP:

Construction Phase
CM Responsibilities
• Direct Charge of Work

Keep City’s Project Manager
and Staff, and City Informed
• Maintain Compliance with
Permits
• Maintain Staff
Communication
• Administer Project Plan
• Quality Assurance
• Monitor Construction
Schedule
• Cost Management
• Project Team
Coordination
• Monitor RFIs and RFCs
• Review Change Orders
• Negotiate Change Orders
• Monthly Progress Reports
• Submittal Completeness
Review
• Maintain Submittal Log
• Coordinate Training,
Start-up and Testing
Observation
• Review Traffic Plans
• Assist, Review, and
Negotiation for Extra
Work Orders
Monitor Project Financial
Status
Submittal Partial Payment
Request
• District Forms and Format

CM Responsibilities
Keep City’s Project Manager
and Staff, and City
of Norwalk Informed
• Maintain Permit
Compliance
• Maintain Staff
Communication
• Quality Assurance
• Daily Inspection Reports
and Digital
Documentation
• Monitor Safety
• Monitor SWPPP
• Coordinate Geotechnical,
Materials, & Water
Sampling Testing
• Monitor Traffic Plan
• Monitor and Lead
Resolution of Day-to-Day
Construction and
Construction Issues
Confirm Materials &
Equipment
• Confirm Installed
Materials Against
Submittals
Construction Survey
• Monitor Construction
Surveying
Consultant Coordination
• Geotechnical & Material
Testing
• CM to coordinate
Contaminate Soil Testing,
Handling, and Disposal
• CM Team to lead and
assist with Public
Relations and Community
Outreach
Review Partial Payment
Requests
CM / Inspector
Responsibilities

Keep City’s Project Manager
and Staff, and City Informed
• Maintain Permit
Compliance
• Maintain Staff
Communication
• Quality Assurance
• Daily Inspection Reports
and Digital
Documentation
• Monitor Safety
• Monitor SWPPP
• Coordinate Geotechnical,
Materials, & Water
Sampling Testing
• Review and Coordinate
the Contractor’s Bypass,
Shutdown, & Start-Up
Plans
• Provide Any Other
Services as Requested by
City, and Permit
Requirements
Confirm Materials &
Equipment
• Confirm Installed
Materials Against
Submittals
• Sample, Test, Impact, and
Document All Materials
Generated and Produced
for the Project
Document Construction
Deviations
• Prepare Estimate of
Increased/Decreased
Quantities
Review Partial Payment
Requests
Start-Up and Close-Out
Phases
Project Final Job Walk
• Generate Preliminary
Punch List
Commissioning
• Staff Training
• Performance Test Period
Record and Submit Record
Drawings
• Review and Certify
Contractor’s Project
Record Drawings
O&M Manuals Final Review
• Coordinate Preparation
and Verify Completeness
of O&M Manuals
Final Payment
• Check for Preliminary
Notices
• Check for Liens
• Liquidated Damages
• Potential Claims
• File Final Notice of
Completion
• Review and Approve Final
Payment

One-Year Warranty Follow-
Up (As Required)
• Prepare Warranty
Expiration Spreadsheet
• Provide Engineering,
Technical Support, and
Administrative Services
during the Warranty
Phase
Regular City Council Meeting - May 15, 2025

Page 292 of 583 ends

WORK REPORTING MECHANISMS
Z&K Consultants, Inc. employs a comprehensive, transparent, and responsive work reporting structure to ensure seamless interaction with the City of Jurupa Valley. Our robust framework is designed to deliver detailed, actionable insights into project performance while addressing potential challenges efficiently. By prioritizing clear communication, detailed documentation, and proactive problem resolution, we ensure that the Projects meet and exceed the City’s expectations.

Interaction Between Z&K Consultants and the City
• Progress Meetings for Alignment and Transparency: Regular progress meetings will be held weekly with City representatives and project stakeholders to review all aspects of the project. These meetings will provide updates on milestones, budget adherence, and schedule performance. Topics will include progre ss toward project deliverables, issues requiring resolution, and upcoming work activities. In addition to verbal updates, Z&K will provide visual aids such as photographs, updated schedules, and financial tracking reports to facilitate informed decision -making. Meeting agendas and minutes will be distributed both in advance and after each meeting to ensure all parties are aligned on action items, deadlines, and responsibilities.
• Detailed Daily Reporting for Real-Time Tracking: To maintain real-time tracking of field activities, Z&K’s Construction Inspectors will submit daily reports documenting all aspects of the day’s work. Each report will provide a summary of completed tasks, resource allocation details, and workforce and equipment usage. Observations on weather, safety, and traffic conditions, as well as any impacts on operations, will also be included. Reports will feature compliance logs and annotated photographs capturing site conditions, completed activities, and any areas requiring immediate attention. These detailed daily reports will ensure transparency and facilitate rapid response to potential challenges. • Centralized Communication for Seamless Coordination: A dedicated Project Manager will serve as the primary liaison between Z&K and the City, ensuring consistent and efficient communication. Real- time interaction will be supported through email updates, phone calls, video meetings, and site visits. Z&K will a lso establish a secure shared document control system for storing reports, schedules, and project documentation. This centralized communication system will minimize delays, ensure responsiveness, and enhance collaboration among all stakeholders. • Proactive Problem Resolution Protocols: Proactive issue resolution is a cornerstone of Z&K’s project management approach. We implement structured protocols to address and resolve issues swiftly, with minimal disruption to project progress. Issues identified by field staff will be documented with photographs and summaries for review by stakeholders.

Potential solutions will be evaluated by Z&K staff in consultation with the City, and corrective actions will be promptly implemented upon approval. All resolutions will be logged to create a clear record of actions taken and enable continuous improvement for future activities.
• Advanced Reporting Technology for Streamlined Management: Z&K utilizes advanced project management and reporting technologies to further enhance communication and transparency. Tools such as construction management software and mobile inspection apps will enable the team to capture field data, upload reports in r eal time, and provide immediate access to documentation for all stakeholders. This technological integration reduces administrative lag, streamlines workflow, and ensures that accurate, up-to-date information is readily available. • Enhanced Public Engagement and Notification Systems: Given the nature of the project and its impact on local residents and businesses, Z&K will employ enhanced public engagement protocols. Notifications will be distributed at least 14 days before construction begins, with follow -up reminders issued two days prior to activities directly impacting residents. All communication materials will be bilingual and tailored to address community concerns. Z&K will maintain a Resident Communication Log, updated daily, to document interactions, ensure follow-through on inquiries, and provide a transparent record of community engagement efforts.
• Rigorous Quality Assurance and Inspection Integration: To ensure the highest standards of quality, Z&K integrates rigorous quality assurance checks at every stage of the project. Inspection findings and quality control results are incorporated into daily and weekly reports, allowing for real -time adjustments a nd ensuring compliance with project specifications. The Project Manager will oversee all completed work, verifying that it meets or exceeds the City’s expectations.
• Collaboration and Stakeholder Engagement: Z&K also places a strong emphasis on collaboration and stakeholder engagement as fundamental elements of successful project delivery. Consistent communication, thorough reporting, and a problem -solving mindset ensure that all stakeholders —including City representatives, residents, businesses, and utilities—remain informed and engaged throughout the project lifecycle. This approach fosters trust, transparency, and a shared commitment to delivering an exceptional final product.

Z&K’s work reporting mechanisms are tailored to ensure the success of the Projects. By employing detailed reporting, clear communication, and proactive problem resolution protocols, we are confident in our ability to maintain transparency, meet deadlines, and deliver a high -quality project. Our approach ensures that all project objectives are met efficiently while exceeding expectations for collaboration, quality, and long-term value to the community.

Regular City Council Meeting - May 15, 2025

Page 293 of 583 ends

QUALITY ASSURANCE/QUALITY CONTRCOL PROCESS
Quality control is a cornerstone of Z&K Consultants, Inc.’s approach to project delivery, ensuring that every phase of work meets or exceeds established standards and aligns with the City of Jurupa Valley’s expectations and funding requirements.

By implementing rigorous quality assurance protocols, we aim to deliver consistent, high -quality results across all project activities, minimizing risks and maximizing long-term value. Our quality control measures are embedded in every aspect of the project lifecycle—from initial planning and pre-construction activities through construction, inspection, and final close- out documentation.

Z&K’s quality control approach combines comprehensive inspections, real-time monitoring, and detailed documentation to maintain transparency, accountability, and adherence to project specifications. Regular inspections and testing procedures enable us to detect and address issues early, preventing costly rework and maintaining project momentum. Additionally, our quality control framework incorporates industry best practices and regulatory guidelines, ensuring that our processes align with federal, state, and local standards, including ADA compliance and applicable funding requirements. This proactive approach not only safeguards the integrity of the project but also fosters strong communication among stakeholders, ensuring a collaborative environment focused on achieving excellence.

Quality Control Protocols
• Comprehensive Inspection Protocols: Construction Inspectors will conduct daily inspections and quality checks, verifying that all materials, workmanship, and construction activities meet project specifications, regulatory standards, and ADA compliance requirements. Detailed daily reports, photographs, and compliance logs will document each inspection, creating a transparent and traceable record of quality checks. • Standardized Testing Procedures: Material Testing Technicians will perform on-site and laboratory testing for critical construction materials such as asphalt and concrete to ensure durability and compliance with specifications. Any materials failing to meet project standards will be flagged for corrective action, with results communicated promptly to the project team.
• Quality Review Meetings: Mid-phase and final quality review meetings will be held with the project team and City representatives to assess milestones, discuss any observed issues, and develop action plans to address deficiencies.

This approach ensures that quality standards are maintained consistently and that issues are resolved before they escalate.
• Documented Quality Assurance (QA) Program: Z&K will implement a formal QA program including checklists, benchmarks, and standard procedures for identifying and addressing quality concerns. The QA program will be reviewed with City representatives to align expectations and maintain uniform standards throughout the project.

Budget Control Measures
• Detailed Budget Tracking: A real-time budget tracking system will monitor all expenditures, including labor, materials, and equipment costs, using advanced project management software. Weekly budget reviews will identify variances, triggering immediate corrective actions to ensure cost control. • Regular Financial Reporting: Comprehensive financial updates will be provided to City officials, summarizing current expenditures, forecasted costs, and potential budget risks. These reports will enable informed decision -making and proactive budget management.
• Cost-Control Measures: Measures such as resource allocation reviews, material cost assessments, and expense audits will ensure efficient use of project resources. Contingency budgets will be maintained for each phase to address unforeseen costs without exceeding the overall budget.

Schedule Control Measures
• Comprehensive Project Scheduling: A detailed project schedule will be developed using software such as Microsoft Project or Primavera, outlining clear milestones and deadlines for each phase of work. The schedule will be regularly updated to reflect actual progress and address any changes promptly. • Weekly Progress Meetings: Weekly meetings with the project team and City representatives will provide updates on schedule adherence, identify potential delays, and implement corrective measures as needed. These meetings will ensure that all stakeholders remain aligned on timelines and priorities. • Milestone Tracking and Reporting : Progress toward project milestones will be tracked and reported by the Project Manager, highlighting tasks at risk of delay and allowing for proactive adjustments to maintain the overall timeline. • Risk Management and Contingency Planning: A risk assessment will be conducted at the project’s outset to identify potential schedule challenges, such as weather delays or resource shortages. Contingency plans will be integrated into the schedule to allow for flexibility and minimize impacts on the project’s overall progress Z&K Consultants is committed to delivering the Projects with the highest standards of quality, efficiency, and accountability.

Our proactive quality control, budget management, and schedule adherence measures are designed to ensure a successful project that exceeds expectations and provides lasting value to the City of Jurupa Valley and its residents.

Regular City Council Meeting - May 15, 2025

Page 294 of 583 ends

QA/QC PLAN
Described below are the activities involved in delivering the tasks in the general order they will occur. The tasks identifie d in the scope of work require varying staff commitments. The staffing plan is presented with the ability to reallocate manhours as needed to fit the Project needs.

Pre-Bid Phase
Activity Description Deliverable
Utility Companies Meet with all utility companies responsible for relocation. Meeting Documentation Photos & Videos Take pre-construction photos and videotape conditions. Photos & video Project Schedule Evaluate proposed schedule for construction duration and cost. Construction Schedule Kick-off Meeting Arrange a pre- construction meeting with agencies, contractor, and utility companies and address all concerns.

Meeting agenda and
minutes
City/Caltrans
Standards
Review and assist staging plans for compliance with the law and Caltrans guidelines.

Review comments &
assist
Construction Phase
Weekly Progress
Meeting
Conduct weekly meetings to discuss schedule, change orders, new issues, submittal status, RFI's & safety.

Meeting agenda and
minutes
Deficiency Log Maintain a log of non-compliant work items. Deficiency Log Process Submittals Review and track all submittals for completeness & constructability. Submittal Approval Log Track Quantities Track quantities of completed/force account work for payment. List of Quantities RFIs Answer the Contractor’s RFI, ensure that the designer explains design RFI. RFI Logs CCOs Review CCO's and recommend needed CCO's. Track cash flow for CCO's. CCO Tracking Claims
Administration
Perform claims administration, coordination and monitoring claims, response preparation, logging claims, and tracking claims status.

Potential claims and
financial impact
WSWD Issue a Weekly Statement of Working Days (WSWD) throughout the project. WSWD
Environmental
Compliance
Review and enforce requirements in permits issued by regulatory and agencies. Maintain/update the master ECR for project compliance. Reports & inspection Labor Compliance Monitor for compliance with the applicable labor laws and contract requirements, such as prevailing wage requirements.

Verify Certified Payrolls
and Interviews
Progress Payments Review contractor's payment requests, verify completed quantities Certified Pay Request Project
Documentation
Maintain a project Uniform Filing System per Caltrans LAPM /Construction Manual “Project Documentation”.

Electronic files, project
files/logs
Project Schedule Review contractor's baseline, monthly, and "look-ahead" submittals. Notify all parties of deviations from the schedule.

Project Schedules,
Correspondence
Permits/Easement
Utility relocations
Continuation of pre -construction activities. Assist in coordination and scheduling of utility work.

Permits easements,
relocated utilities
SWPPP & Safety
Assist and review, approve and monitor of the Contractor’s SWPPP.

Review, monitor, document and enforce contractor safety procedures for compliance with laws and regulations.

SWPPP Review,
conduct regular
safety/tailgate meetings
Quality Assurance /
Inspection
Inspect work to ensure compliance with contract documents. Reject unacceptable work using Deficiency Log.

Daily Reports.

Deficiency Log
Progress Photos Continue taking pictures to document the contractor's progress. Captured Photos Community
Outreach Respond to citizens and business owner’s concerns. Minimize complaints Daily Reports Document contractor’s daily operations and provides daily diaries. Daily Reports Traffic Control,
Closure Coordination
Review contractor’s traffic control and lane closure request, obtains CT closure approval, establish an agreement/contract with CHP’s.

Conduct regular safety/
tailgate meetings
Post Construction Phase
Final Inspection Conduct a final inspection/walk-through including maintenance and service personnel. Issue preliminary and final punch list. Coordinate with City.

Punch lists and Notice
of Completion
"As-Built" Drawings Review Contractor's redline drawings, submit to the designer. As-built redline drawings
Dispute Resolution As requested, aids in resolving any outstanding disputes. Negotiation/ arbitration Project Files Deliver all project files and complete Final Report. Project files Final Inspection Conduct a final inspection/walk-through. Issue preliminary and final punch list. Punch lists and NOC
Final Pay Request,
Certificate of
Completion
Process the contractor's final payment request, issue a Certificate of Completion, obtain applicable permits and a Project Final Report.

Final Pay Request,
Certification of
Completion
Regular City Council Meeting - May 15, 2025

Page 295 of 583 ends

PROJECT CHALLENGES & RECOMMENDATIONS
This Project Challenges & Recommendations table identifies potential issues, conflicts, and concerns that could arise during the construction phase of the project. The findings in this report are based on a comprehensive review of the Project Plans, Specifications, and a thorough field investigation of the site conditions. Our review included an in-depth analysis of the work site to assess factors such as site access, the presence of existing infrastructure, and surrounding conditions that could impact construction activities. By examining these elements, we aim to proactively address any challenges that may affect the successful execution of the project, ensuring alignment with the Project Plans and Specifications.

Category Project Challenge Recommendation
Traffic Control
Limitations
Lane closures are restricted during peak hours
(8:30 AM - 4:00 PM), which may limit
operations like cold milling and paving that
need uninterrupted work windows.

Confirm if extended lane closures can be
approved by the Engineer for tasks requiring
more time and coordinate closures with
impacted stakeholders to maintain the
schedule.

Utility Adjustment
Timelines
Adjusting storm drain manholes, sewer
manholes, and valve covers is tied to final
pavement completion, potentially delaying the
schedule.

Specify if utility adjustments can occur
concurrently with paving or require separate
mobilizations to minimize disruptions and
streamline the construction process.

Sidewalk and ADA
Compliance
Sidewalk surface variation tolerance of 0.02 ft
is required. Non-compliant ADA ramps must be
removed and replaced at the contractor's
expense.

Use a pre -construction checklist for ADA
compliance to minimize rework and clarify
inspection procedures before demolition or
reconstruction begins.

Backfill and
Landscape
Restoration
Backfill for planting areas must include 6
inches of compacted topsoil (85%). This may
not apply uniformly across all project locations.

Identify planting areas during pre-construction
walkthroughs to establish clear restoration
scopes and avoid disputes regarding
landscape restoration.

Public
Communication
Residents and businesses impacted by the
construction require notification 14 and 2
working days before activities causing
disruption.

Ensure the Contractor provides bilingual
written notices approved by City staff and
distribute them through USPS at least 10
working days before the start of construction to
ensure clear communication with
stakeholders.

Public
Communication
The project involves areas near schools and
businesses, requiring coordination to minimize
disruptions during school hours and daily
schedules.

Begin coordination with the School District
early to align construction schedules with bell
schedules and minimize disruptions to student
and parent routines.

Dust and Noise
Control
Construction activities may lead to noise and
fugitive dust disturbances to surrounding
neighborhoods and businesses.

Implement strict noise and dust control
measures, including real -time monitoring, to
minimize impact. Schedule noisy activities
during acceptable hours and provide advance
notice to affected residents and businesses.

Temporary Traffic
Control
Traffic control measures must ensure safety
and efficiency in high-traffic areas near schools
and residences.

Review advanced notice message board
language with the Construction Manager and
Engineer before posting. Require certified
flaggers for traffic management and obtain
documentation of their certification prior to
construction.

Document Control
Proper tracking and logging of submittals,
RFIs, RFCs, and other documentation is
essential for smooth project execution.

Ensure that the Construction Manager
establishes a comprehensive system for
document control, with timely processing of
correspondence and updates to ensure project
progress and maintain clear communication
with stakeholders.

Inspection
Reporting
Daily construction activity reports must capture
all labor, equipment, materials, and work
details for future auditing.

Require clear and concise daily reports with
supporting photographs to maintain
transparency and provide a comprehensive
record for project oversight and compliance
audits.

Utility Markings and
Coordination
Faded utility markings require re -marking
during construction, potentially causing delays.

Ensure accurate utility mapping pre -
construction and confirm coordination with
Underground Service Alert (USA) for ongoing
updates during construction activities.

Regular City Council Meeting - May 15, 2025

Page 296 of 583 ends

SERVICES PROVIDED BY THE PROPOSER
Z&K Consultants, Inc. is fully prepared to provide a comprehensive suite of services for the Projects using our skilled in- house staff and a single trusted sub -consultant for material testing. Below is a detailed breakdown of the services to be provided and the resources allocated to ensure project success:

Services Provided by In-House Staff
• Project Management: Z&K’s experienced Project Manager will oversee all aspects of the project, including scheduling, budgeting, contractor coordination, and communication with City representatives. Acting as the primary point of contact, the Project Manager will ensure timely resolution of any issues and maintain alignment with project goals. • Construction Management : Our in -house team will provide detailed oversight of contractor activities, ensuring adherence to plans, specifications, and safety standards. This includes reviewing submittals, RFIs, and schedules, and ensuring all project milestones are met on time and within budget. • Construction Inspection: Z&K’s dedicated Inspectors will perform daily on -site inspections to verify compliance with project specifications, regulatory standards, and safety protocols. Detailed daily reports will document site activities, including workforce levels, material deliveries, and equipment usage, to maintain a transparent record of progress. • Quality Assurance and Quality Control (QA/QC): Z&K’s in-house QA/QC team will ensure all construction activities, materials, and workmanship meet project specifications and regulatory requirements. Comprehensive inspections will focus on ADA compliance, pavement specifications, and SWPPP implementation. • Traffic Control Review | Our team will review and approve traffic control plans, ensuring safety for both the public and construction workers, while minimizing disruptions during construction. • Public Communication: Z&K staff will handle all public outreach efforts, including distributing notifications to residents, schools, and businesses. We will ensure that stakeholders are informed about construction schedules and potential impacts. Special attention will be given to coordinating with schools and businesses to minimize disruptions to daily operations.
• Labor Compliance Monitoring: Our team will review certified payrolls and verify prevailing wage compliance to ensure all contractors meet local, state, and federal labor requirements.

Services Provided by Sub-Consultant | For specialized material testing services, Z&K will partner with a trusted, certified sub-consultant laboratory. This sub-consultant will perform:
• Material Testing: Compaction testing for subgrade and asphalt layers. Verification of asphalt mix designs to meet project specifications. Concrete strength testing to ensure compliance with structural requirements. • Reporting and Compliance: Detailed test results will be provided to verify material quality and adherence to specifications, ensuring the project’s long-term durability and safety.

Resource Allocation
• In-House Team: Z&K’s in-house team will manage all construction management, inspection, quality control, traffic control, and public communication tasks.
• Sub-Consultant Coordination: Material testing services will be seamlessly integrated into the project workflow through close coordination between Z&K’s team and the sub-consultant.

By leveraging our experienced in-house team and a specialized material testing sub-consultant, Z&K Consultants ensures that the project will be executed with precision, efficiency, and a commitment to excellence.

TECHNICAL CAPABILITIES OF THE PROPOSER
Z&K Consultants, Inc. possesses extensive technical capabilities to deliver the Projects with precision and efficiency. Our multidisciplinary team, coupled with advanced tools and methodologies, ensures a seamless execution of all project phases.

Below is an overview of our technical strengths:

Advanced Project Management Tools
• Scheduling Software: Z&K utilizes industry- standard tools such as Microsoft Project and Primavera to create, monitor, and adjust project schedules in real-time, ensuring adherence to critical timelines.
• Budget Tracking: Our team employs specialized project management software for detailed cost tracking and
forecasting, enabling accurate budget control throughout the project lifecycle.
• Document Management Systems: Z&K uses digital
platforms for logging and tracking submittals, RFIs, and other critical project documents, ensuring efficient
communication and timely responses.

Construction Management Expertise
• Regulatory Knowledge: Our team is well-versed in local, state, and federal construction standards, including ADA compliance, Caltrans specifications, and SWPPP
requirements.
• Pavement Rehabilitation: Z&K has deep expertise in cold milling, asphalt overlay, slurry sealing, and dig-out repairs, ensuring pavement durability and smoothness.
• Utility Coordination: We have extensive experience in coordinating utility adjustments, including storm drain and sewer systems, minimizing disruptions and ensuring
alignment with project schedules.

Regular City Council Meeting - May 15, 2025

Page 297 of 583 ends

Inspection and Quality Control
• On-Site Inspection: Our Construction Inspectors use
advanced tools such as laser levels and GPS equipment
for precise measurements and verification of project
specifications.
• Material Verification: Z&K’s team performs rigorous on - site inspections to verify the quality of asphalt, concrete, and other materials, ensuring compliance with project
requirements.
• Reporting: Detailed daily inspection reports, supported by high-resolution photographs, provide transparency and
traceability throughout construction.

Public Communication and Stakeholder Coordination
• Community Engagement: Z&K has proven strategies for
maintaining clear communication with residents, schools, businesses, and public agencies to minimize disruptions. • Bilingual Outreach: Our team is equipped to deliver
notifications and updates in both English and Spanish,
ensuring inclusivity and effective stakeholder engagement.

Specialized Expertise
• Traffic Control Management: Our team is proficient in the design and review of temporary traffic control plans,
ensuring safety and minimizing delays during construction activities.
• Stormwater Management: Z&K is experienced in
implementing SWPPP measures, including erosion control
and stormwater pollution prevention strategies.
• Material Testing Coordination: Through our certified sub-consultant, we ensure all materials meet stringent
quality standards, supporting the structural integrity and longevity of the project.

Proven Technology Integration
• Surveying and Mapping: Our team uses advanced
surveying equipment for accurate alignment and grading, ensuring the project adheres to design specifications.
• Real-Time Communication Tools: Z&K leverages mobile
technology to provide instant updates to the City,
enhancing coordination and responsiveness.

By combining state-of-the-art technology, experienced personnel, and proven methodologies, Z&K Consultants is uniquely positioned to deliver a high-quality, efficient, and cost-effective solution for the Projects. Our technical capabilities ensure that every aspect of the project is managed with the highest level of expertise and attention to detail.

SCOPE OF WORK
Z&K Consultants, Inc. will provide comprehensive construction management and inspection services to ensure the successful execution of the Project s. Our team is committed to delivering high -quality results while adhering to project specifications, regulatory requirements, and the City of Jurupa Valley’s expectations. The scope of work encompasses all phases of the project, from pre-construction planning to final close-out.

During the pre-construction phase, Z&K will conduct a detailed constructability review of project plans and specifications to identify potential issues and provide recommendations for improvement. We will facilitate pre -construction meetings with stakeholders, including contractors, utility providers, and City representatives, to confirm alignment on project goals, timelines, and requirements. Our team will verify all traffic control plans, utility coordination, and environmental compliance measures, such as SWPPP implementation, to ensure readiness for construction.

Throughout the construction phase, Z&K’s experienced Construction Inspectors will oversee daily activities to verify compliance with project specifications and regulatory standards, including ADA requirements. Inspections will cover all major tasks, such as pavement rehabilitation, cold milling, asphalt overlay, slurry sealing, and dig-out repairs. We will closely monitor contractor performance, track progress against schedules, and document site activities through detailed daily reports. Our team will also coordinate utility adjustments, ensuring that storm drain and sewer manholes, valve covers, and other infrastructure are addressed efficiently to minimize delays.

Z&K will ensure that all quality assurance and quality control measures are implemented rigorously. This includes verifying material compliance, such as asphalt and concrete mix designs, through our trusted sub-consultant for material testing. We will manage project documentation, including submittals, RFIs, change orders, and progress payments, ensuring timely review and approval processes.

Public and stakeholder communication is a critical component of our scope of work. Z&K will coordinate outreach efforts to notify residents, businesses, and schools in advance of construction activities, providing bilingual notifications as needed.

We will maintain open lines of communication with all stakeholders, addressing concerns promptly and effectively to minimize disruptions and maintain public satisfaction.

During the close-out phase, Z&K will perform a thorough final inspection to verify that all work meets project specifications and standards. We will prepare as-built drawings, compile project documentation for City records, and ensure that all punch- list items are addressed promptly. Our team will provide a comprehensive project completion report, summarizing all activities, milestones, and outcomes, to facilitate a smooth handover to the City.

Z&K’s scope of work is designed to ensure that the Projects are completed on time, within budget, and to the highest standards of quality and safety. Through meticulous planning, proactive management, and continuous communication, we will deliver exceptional results for the City of Jurupa Valley.

Regular City Council Meeting - May 15, 2025

Page 298 of 583 ends

APPROACH TO SCOPE OF WORK
Our approach to providing the services described in this RFP is comprehensive, structured, and tailored to meet the specific needs of the City’s project. Below is a detailed outline of our approach to each task, identifying subconsultants where applicable:

PROJECT INITIATION AND PLANNING
Kickoff Meeting: Schedule and chair a kickoff meeting with City representatives, inspectors, design engineers, and other stakeholders to discuss the work plan and special concerns.

Field Walk: Conduct a field walk with inspectors, design engineers, and City representatives to familiarize the team with the project site and scope.

Work Plan Development: Develop a detailed work plan
outlining key tasks, milestones, responsibilities, and
timelines.

CONSTRUCTION MANAGEMENT AND OVERSIGHT

Field Office Management: Staff and maintain a consultant- provided field office for the duration of the construction.

Ensure the field office is equipped with necessary tools and technology to support project management and
communication needs.

Permit Review: Review all project permit requirements
thoroughly to ensure compliance with local, state, and federal regulations. Coordinate with the relevant authorities to secure any additional permits required during the
construction phase.

Coordination of Activities: Provide continuous
coordination of project activities, preparing necessary reports and documents for City review and action. Ensure all project activities are aligned with the schedule and milestones.

Contract Administration: Administer the construction
contract in conformance with the project plans and
specifications, including Caltrans and City requirements.

Manage all RFIs, submittals, and change orders in
coordination with the Contractor and Design Engineers.

QUALITY ASSURANCE AND CONTROL

Inspection Coordination: Our in-house team will perform all necessary inspections and monitor compliance with project specifications and regulatory standards.

Document Control: Maintain a comprehensive record of all project documents, including contracts, drawings,
specifications, and change orders.

SCHEDULE AND COST MANAGEMENT

Schedule Monitoring: Review and analyze the Contractor’s schedule weekly. Work with the Contractor to maintain the project schedule and suggest revisions as needed.

Cost Tracking: Track project expenditures against the
budget, review Contractor invoices, and manage change
orders to minimize budget overruns.

RISK AND SAFETY MANAGEMENT
Risk Assessment: Conduct regular risk assessments to
identify potential project risks and develop mitigation strategies.

Safety Program: Implement a comprehensive safety
program, conduct regular safety audits, and provide safety training to ensure a safe working environment.

COMMUNICATION AND REPORTING

Progress Meetings: Conduct weekly construction progress meetings with all stakeholders to discuss procedures,
progress, problems, and scheduling. Prepare and distribute meeting minutes.

Weekly Newsletter: Provide a Weekly Newsletter
summarizing project progress, details of work completed, and upcoming work, including captioned aerial and site
photos.

PROBLEM IDENTIFICATION AND RESOLUTION

Identification: Regularly monitor project progress through site inspections and the Project Control System (PCS).

Utilize the PCS to flag deviations from the project plan, allowing for early detection of potential issues. Encourage open communication among project team members to
identify problems promptly.

Resolution approach : Approach includes the following
steps.

Analysis: Thoroughly analyze the identified problem to
understand its root cause
Consultation: Engage relevant stakeholders, including City staff, Contractors, and consultants, to discuss potential solutions
Implementation: Develop and implement an action plan to resolve the issue, ensuring minimal disruption to the project timeline
Documentation: Document the issue and the resolution
process for future reference and continuous improvement.

Handling Unforeseen Problems: In past projects, our team effectively handled unforeseen issues like unexpected
underground utilities through the following strategies:

Rapid Response Team: Assemble a team of experts to
assess the situation immediately. Conduct a thorough site investigation to understand the scope of the problem.

Alternative Solutions: Propose alternative solutions to stakeholders and select the most feasible option. Evaluate the impact of solutions on the project timeline and budget.

Adaptive Planning: Adjust the project plan and
communicate changes to all stakeholders to ensure
everyone is informed. Implement the chosen solution and monitor its effectiveness closely.

By employing a proactive approach to coordination and
problem resolution, combined with robust construction
management practices, our team ensures that the project progresses smoothly, adheres to the schedule, and meets all regulatory requirements.

COORDINATION WITH STAKEHOLDERS
City Staff: Establish regular coordination meetings with City staff to ensure alignment on project objectives, timelines, and deliverables. Develop a communication protocol to keep City staff informed of project progress, issues, and milestones.

Utilize collaborative tools and platforms to share updates, documents, and reports efficiently.

Regular City Council Meeting - May 15, 2025

Page 299 of 583 ends

Caltrans: Maintain close collaboration with Caltrans to ensure compliance with state requirements and facilitate necessary approvals. Schedule regular updates and
meetings with Caltrans representatives to discuss project status and address any concerns. Use established channels for submitting reports and obtaining feedback promptly.

Local Agencies: Engage with local agencies to address
regional impacts and secure necessary permits. Provide regular updates to local agencies to ensure transparency and foster cooperation. Coordinate with local traffic management authorities to minimize disruptions during construction.

Utility Companies: Engage utility companies early in the project to coordinate any necessary relocations or
modifications. Schedule coordination meetings with utility representatives to plan and manage utility work efficiently.

Monitor utility work closely to ensure it aligns with the overall project schedule and minimize potential delays.

Regulatory and Permitting Agencies: Ensure compliance
with all regulatory requirements through continuous
interaction with relevant agencies. Schedule inspections and ensure all necessary documentation is submitted timely.

Address any regulatory concerns promptly to avoid delays.

APPROACH FOR EACH TASK

CONSTRUCTION MANAGEMENT
Field Office Management: Staff and maintain a consultant- provided field office for the duration of the construction.

Ensure the field office is equipped with necessary tools and technology to support project management and
communication needs.

Permit Review: Review all project permit requirements
thoroughly to ensure compliance with local, state, and federal regulations. Coordinate with the relevant authorities to secure any additional permits required during the
construction phase.

Field Walks and Kickoff Meetings: Schedule and attend
field walks with inspectors, design engineers, and City representatives. Chair the kickoff meeting with the City to discuss the proposed work plan and any special concerns to be addressed at the pre-construction meeting.

Pre-Construction Meeting: Provide a pre -construction
meeting agenda to the City for concurrence. Lead the pre - construction meeting, ensuring all interested parties,
including utilities and sub-Contractors, are notified.

Coordination of Project Activities: Provide continuous coordination of project activities, preparing necessary reports and documents for City review and action. Ensure all project activities are aligned with the schedule and milestones.

Documentation Management: Maintain a comprehensive
record at the project site or consultant’s local office, including all contracts, drawings, specifications, addenda, change orders, shop drawings, and other relevant documents.

Weekly Status Reports: Provide weekly status reports to the City, highlighting project progress, any issues
encountered, and upcoming activities.

Review and Coordination of Test Reports: Review
laboratory, shop, and mill test reports of materials and equipment. Coordinate with Design Engineers as required to ensure compliance with specifications.

Weekly Statements and Monitoring: Prepare and send a
Weekly Statement of Working Days, noting the controlling operations to the Contractor. Monitor Contractor and sub - Contractor compliance with labor laws and requirements, including certified payroll and prevailing wage compliance.

Utility Coordination: Coordinate, monitor, and document utility relocations as necessary, ensuring minimal disruption to the project schedule.

Daily/Weekly Reporting: Prepare daily/weekly Resident
Engineer reports, including work done, controlling operation, weather conditions, and important discussions with the
Contractor.

Contract Administration: Administer the construction
contract in accordance with the project Plans and
Specifications, including applicable Caltrans and City
requirements. Manage all RFIs, submittals, and change
orders in coordination with the Contractor and Design
Engineers.

Progress Meetings: Conduct weekly construction progress meetings with all stakeholders to discuss procedures,
progress, problems, and scheduling. Prepare and distribute meeting minutes.

Contract Filing System: Maintain a Contract Filing System in accordance with Caltrans Construction Manual and Local Assistance Procedures Manual (LAPM).

Subcontracting and Inspection Coordination: Review
and approve Subcontracting Request forms. Coordinate and monitor all inspection activities, ensuring compliance with the project specifications and regulatory standards.

Stakeholder Coordination: Maintain open communication
with property owners and business owners to address
concerns and provide updates on the project.

Traffic Control and Safety: Administer and monitor the implementation of the project's Traffic Control Plans,
conducting weekly reviews for conformance to the plans.

Construction Closeout: Administer and coordinate final inspections and the completion of all punch list items. Assist the City in determining substantial completion and issuing the notice of completion.

INSPECTION
Compliance and Documentation: Review contract
documents, plans, and permits to ensure compliance. Attend field walks and kickoff meetings to align inspection activities with project requirements.

Monitoring and Reporting: Monitor and enforce
construction noticing requirements, including PM10 and
SWPPP requirements. Maintain a field diary with detailed daily and weekly reports, change order documentation, and photographs.

Testing and Quality Assurance: Ensure compliance with
the construction contract through continuous monitoring and evaluation. Track and monitor construction costs,
maintaining a digital photographic history of the project progress.

ADA Compliance and Staking Review: Ensure ADA
compliance throughout the construction phase. Review
construction staking as appropriate to ensure accuracy.

Regular City Council Meeting - May 15, 2025

Page 300 of 583 ends

RESOURCES, INFORMATION, AND ASSISTANCE REQUIRED FROM THE CITY The City’s provision of all relevant project documents will serve as the foundation for effective planning, execution, and monitoring. This includes approved plans and specifications to guide field inspections and quality control processes, as well as bid documents detailing contractor schedules, cost breakdowns, and awarded contract details to monitor progress, manage payments, and resolve discrepancies. Historical records such as previous inspectio n reports, as-built drawings, and maintenance histories for areas within the project scope will also help identify potential challenges and ensure alignment with project objectives.

Utility Coordination and Mapping | Utility coordination is a critical component of this project, and support from the City is necessary to streamline these activities. Accurate and up -to-date utility maps for water, sewer, gas, electrical, and telecommunications infrastructure are essential to avoid conflicts during construction. Contact details for utility providers and other stakeholders will facilitate timely communication and resolution of utility -related issues. Additionally, the City’s assistance in scheduling pre -construction utility coordination meetings and securing necessary permissions from utility companies will be vital.

Regulatory and Environmental Compliance | Z&K will require assistance from the City in ensuring all work adheres to applicable regulations and environmental requirements. This includes regulatory documentation such as standards, ordinances, and guidelines related to ADA compliance, stormwater pollution prevention plans (SWPPP), and traffic control.

Any existing environmental assessments, geotechnical studies, or ecological impact reports relevant to the project area will also be necessary to maintain compliance.

Geographic and Site Information | To optimize planning and construction activities, the City’s Geographic Information System (GIS) data and other resources will be required. This includes GIS -based maps showing property boundaries,
easements, and right-of-way information, as well as existing survey data for alignment, grading, and drainage features.

Permits and Approvals | The City will need to provide or assist in securing all permits and approvals necessary for project execution. These include traffic control permits for lane closures, detours, and other traffic management
measures, environmental clearances to confirm compliance with local, state, and federal requirements, and right-of-entry agreements for accessing private properties or restricted areas within the project limits.

Financial and Administrative Support | Transparency and efficiency in financial and administrative processes are essential for project success. Z&K will require detailed project budget information, including allocated contingency funds, to assist in cost tracking and change order management. Clear guidance on the City’s procedures for submitting, reviewing, and approving progress payments, retention releases, and final payments will streamline the administrative process.

Additionally, access to City -standard templates for reports, change orders, and close -out documentation will ensure consistency.

Community and Stakeholder Engagement | Given the direct impact of construction on residents, businesses, schools, and other stakeholders, collaboration with the City is critical to ensure effective communication. The City’s guidelines for engaging with stakeholders, including required notice periods and approved methods for distributing information, will be essential. Public notification templates in English and Spanish, ensuring inclusivity, and stakeholder contact information for schools, businesses, and homeowner associations will facilitate proactive communication and minimize disruptions.

Access to City Staff | Z&K will require collaboration with various City staff throughout the project lifecycle. This includes a designated City representative for day- to-day communication and decision- making, as well as coordination with departments such as Public Works, Traffic Engineering, and Community Development for approvals, updates, and inspections. Assistance in communicating with external agencies such as fire, police, and transportation authorities will also be necessary for traffic management and emergency access planning.

Coordination with Schools and Local Services | Construction activities will directly impact schools, residential areas, and commercial establishments. Early communication with school district officials will help plan construction around school schedules, drop-off/pick-up times, and pedestrian safety requirements. Coordination with local service providers, such as waste management and postal services, will ensure uninterrupted services during construction.

By providing these resources, information, and assistance, the City of Jurupa Valley will empower Z&K Consultants to deliver exceptional results for the Projects. This collaborative approach will ensure the project progresses efficiently, aligns with community needs, and adheres to the highest standards of quality and safety.

Regular City Council Meeting - May 15, 2025

Page 301 of 583 ends

APPENDIX A. RESUMES
Regular City Council Meeting - May 15, 2025

Page 302 of 583 ends

Mr. Flores is an experienced Senior Construction Manager with years of expertise managing a wide range of infrastructure and roadway improvement projects. His comprehensive skill set includes pavement rehabilitation, ADA -compliant upgrades, utility adjustments, storm drainage systems, and traffic control implementation. Mr.

Flores has successfully overseen both public and private sector projects, ensuring compliance with regulatory and municipal standards. His extensive experience includes managing complex projects that feature asphalt resurfacing, curb ramp installations, sidewalk improvements, storm drain enhancements, landscaped medians, and traffic signal modifications. With a strong understanding of Caltrans construction standards, local agency specifications, and Cal-OSHA safety protocols, Mr. Flores ensures projects are delivered safely, efficiently, and within budget.

As a Senior Construction Manager, Mr. Flores excels in managing all aspects of construction oversight, including field inspection, contractor coordination, and adherence to project plans and specifications. He is proficient in handling key project documentation such as RFIs, submittals, progress payments, and contract change orders (CCOs). His ability to identify and mitigate potential delays has been instrumental in maintaining project schedules and minimizing disruptions.

Mr. Flores also prioritizes proactive community engagement to address concerns from residents, businesses, and schools. By maintaining clear communication with stakeholders, utility companies, and local agencies, he ensures minimal impact on the surrounding community while promoting positive collaboration. His ability to manage complex projects, resolve challenges efficiently, and uphold safety and quality standards makes Mr. Flores a valuable asset to the City of Jurupa Valley’s construction projects.

PROJECT EXPERIENCE
CITY OF CARSON, CITYWIDE PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This project covers streets across all four districts within the City of Carson, focusing on essential infrastructure improvements for identified roadways, sidewalks, curb ramps, and related assets in need of repair. The scope of work includes traffic control, striping, pavement markings, cold milling, leveling course, asphalt rubber hot mix, installation of traffic loop detectors, concrete enhancements, and slurry sealing.

CITY OF CHINO, PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This Project includes street rehabilitation and slurry seal of various streets, including, Pipeline Ave from City Limits to City Limits, Chino Ave from City Limits to City Limits and Schaefer Ave from City Limits to City Limits. Scope of work includes pave ment improvements, street resurfacing, crack sealing, slurry seal, localized dig -outs, striping removal/install, and traffic loop detectors. Z&K provided preparation of submittal packages, scheduling, mark outs, meetings, cost control, reviewing RFIs, preparing change order proposals, permits, progress billings, subcontractor coordination, as -built drawings, and final walkthrough/closeout.

CITY OF CORONA, CORONA GREEN ALLEYS IMPROVEMENT PROJECT | The Project aimed to transform selected alleyways in the City into environmentally friendly, functional, and sustainable public spaces. This project includes extensive surface improvements, installation of permeable pavements, and stormwater management features to enhance water quality and reduce urban runoff. Key elements of the work involve unclassified excavation, installation of aggregate base and porous asphalt, sidewalk and driveway construction, and the implementation of landscape elements like green infrastructure and solar lighting fixtures. The project incorporates drainage improvements and sustainable infrastructure elements to reduce the heat island effect, create safe pedestrian zones, and improve aesthetics.

CITY OF CORONA , SHERBORN STREET IMPROVEMENT PROJECT | The Sherborn Street Improvement Project in Corona enhanced local infrastructure with comprehensive street upgrades. The project included pavement rehabilitation, curb and gutter installations, and utility improvements, all aimed at boosting accessibility and safety. Landscaping and storm drain enhancements completed the revitalization of this essential roadway.

CITY OF DOWNEY, WOODRUFF AVENUE PAVEMENT REHABILITATION PROJECT | The Woodruff Avenue Pavement Rehabilitation Project encompasses the rehabilitation of Woodruff Avenue between Firestone Boulevard and Washburn Road in the City of Downey, California. This includes extensive pavement reconstruction, involving the repair of failed pavement areas, cold milling of existing asphalt, and the installation of both asphalt concrete (AC) base course and asphalt Anthony Flores, BSCE
Senior Construction Manager

EDUCATION
» Bachelor of Science in Civil
Engineering – California
State University, Long Beach

TRAINING & REGISTRATION
» Engineer-In-Training (EIT),
State of California, #170698
» Caltrans Temporary
Pedestrian Facilities Training
» 30-Hr. Cal OSHA
» Defensive Driving Training

Regular City Council Meeting - May 15, 2025

Page 303 of 583 ends

rubber hot mix (ARHM) overlay. Additionally, the project addresses uplifted or damaged concrete infrastructure by replacing substandard curbs, gutters, sidewalks, and driveways to ensure safety and ADA compliance. Enhancements also include the installation of steel conduits and single -mode fiber optic cables for improved communication infrastructure. The work will be completed with adjustments to manhole and valve covers, updated traffic striping and markings, and a comprehensive traffic control plan. This project aims to improve road safety, durability, and overall accessibility for residents and commuters.

CITY OF FONTANA , SIERRA AVENUE LANDSCAPE MEDIAN PROJECT | The Sierra Avenue Landscape Median Improvement Project (Bid No. DE-24-28-SB) involves the enhancement of the landscape and irrigation infrastructure along the Sierra Avenue corridor in Fontana, California, between Foothill Boulevard and Baseline Avenue. This project includes the installation of new hardscape and landscape features, along with an advanced irrigation system to ensure efficient water management and compliance with the City’s water conse rvation standards. Key components of the project include soil preparation, planting of drought -tolerant species, and installation of automated irrigation systems designed for water efficiency. This project also entails excavation, concrete curbing, and safety measures to protect the medians from vehicular traffic. The goal is to improve the aesthetic appeal, sustainability, and functionality of the medians along this major thoroughfare, providing a greener, more welcoming environment for residents and commuters.

CITY OF LAKE FOREST , STREET RESURFACING PROJECT | The Project involves the street resurfacing of Glenn Ranch Road from Portola Parkway to El Toro Road, as well as the slurry seal of and arterial slurry seal of Jeronimo and Muirlands from Los Alisos to Bake. Relevant project features include street resurfacing and re habilitation, application of slurry seal, grinding and overlay, cold milling, concrete improvements, ARHM pavement, AC base course, aggregate base, signing, striping, markings and pavement legends, removal and replacement of PCC curb ramps, removal and replacement of PCC sidewalk, bike lane traffic loops, Type E traffic loops, dig -outs, sewer and storm drain manhole adjustments, and water valves adjustments.

CITY OF MANHATTAN BEACH, SLURRY SEAL PROJECT NORTH & SOUTH AREAS OF SAND SECTION | The Project involves comprehensive pavement and surface improvements. The scope of work includes striping and paint removal, full- depth asphalt removal and replacement, asphalt patchwork, crack sealing, slurry sealing, sealcoat application, and installation of signage and striping. Additional features of the project include the construction of decorative crosswalks, pressure washing for paint removal at playgrounds, and updated pavement markings in the playground areas within the north section of the Sand Section area.

CITY OF PALM SPRINGS, HSIP CYCLE 9 TRAFFIC SIGNAL MODIFICATIONS (NINE INTERSECTIONS) PROJECT | The HSIP Cycle 9 Traffic Signal Modifications Project in the City of Palm Springs was initiated to enhance traffic safety and pedestrian accessibility at nine signalized intersections across the city. This federally funded project introduced several critical improvements to enhance roadway safety and improve intersection functionality. Key upgrades included the modification of existing traffic signals to improve v isibility, installation of advanced dilemma zone detection systems to reduce potential collisions, and the addition of protected left -turn phases to improve turning safety. To further enhance pedestrian safety, pedestrian countdown signal heads were installed to provide clear crossing information. The project also included the reconstruction of ADA-compliant curb ramps, ensuring improved accessibility for individuals with disabilities.

These enhancements collectively improve traffic flow, reduce accident risks, and create safer and more accessible roadways for Palm Springs residents and visitors.

CITY OF SAN BERNARDINO , STREET REHABILITATION PROGRAM (30+ MAJOR CITY STREETS) | The project encompasses extensive pavement and infrastructure improvements for over 30 major streets and multiple intersections across the city. This ongoing project includes roadway and pavement rehabilitation, concrete improvements, installation of cross gutters, curb and gutter replacement, curb ramps, ADA upgrades, and storm drain and pipeline relocations. Additional work involves traffic signal enhancements, comprehensive traffic control, full-depth asphalt removal and replacement, cold milling and AC overlay, slurry seal applications, PCC sidewalk installation, and replacement of existing PCC driveways, driveway approaches, curb ramps, retaining curbs, a 3-foot-high retaining wall, parkway culverts, and cross gutters.

CITY OF SAN MARINO, STREET REHABILITATION PROGRAM PHASE 1 & 2 | The project included a wide range of improvements, such as roadway and pavement reconstruction, concrete enhancements, installation of cross gutters, curbs and gutters, curb ramps, and ADA-compliant upgrades. The work also covered cold milling of asphalt concrete pavement followed by resurfacing with hot mix asphalt (HMA) and asphalt rubber hot mix (ARHM). Additional tasks involved clearing and grubbing, localized pavement repairs, and replacement of impacted traffic striping, pavement markings, legends, loop detectors, and curb painting. Further improvements included driveways and driveway approaches, installation of speed humps, adjustment of utility frames and grates, inspection and replacement of sewer manholes, water valves, water meters, and storm drain manholes, as well as SWPPP preparation and implementation of temporary construction BMPs.

CITY OF TORRANCE, ANZA/VISTA MONTANA/PCH TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS | The Anza/Vista Montana/PCH Traffic Signal and Intersection Improvements Project in the City of Torrance was designed to enhance traffic flow, improve safety, and expand roadway capacity at a heavily trafficked intersection. Key upgrades included modernizing the traffic signal systems, installing pedestrian countdown signals, and integrating fiber optic communication equipment to improve signal coordination.

Regular City Council Meeting - May 15, 2025

Page 304 of 583 ends

Mr. Zack Faqih brings over 32 years of experience in construction management, project oversight, and infrastructure improvements for public and private sector projects. He has successfully managed more than 45 intersection improvement and traffic signal modification projects, showcasing his expertise in coordinating federally funded projects administered through Caltrans. His extensive background also includes street improvements, ADA -compliant upgrades, draina ge system enhancements, and utility coordination. Mr. Faqih’s diverse skill set encompasses budget analysis, contract negotiations, schedule management, and stakeholder coordination, ensuring seamless communication between contractors, city staff, and regulatory agencies. His proactive leadership and strong problem-solving skills allow him to effectively manage complex project challenges while maintaining focus on quality, safety, and timely delivery.

Holding multiple certifications, including Professional Engineer (PE), Certified Building Official (CBO), and QSD/QSP credentials, Mr. Faqih has extensive technical expertise that ensures projects adhere to Caltrans standards, including the Local Assistanc e Procedures Manual (LAPM), Construction Manual, and Standard Specifications. His experience navigating these requirements allows him to manage documentation, inspections, and compliance efficiently.

Mr. Faqih’s ability to maintain clear communication, anticipate project risks, and proactively resolve issues has consistently led to successful project outcomes. His leadership in coordinating construction staging, traffic control measures, and utility adjustments ensures minimal disruption to the public.

PROJECT EXPERIENCE

CITY OF ALHAMBRA, PEDESTRIAN COUNTDOWN SIGNAL HEAD
INSTALLATION PROJECT | The City of Alhambra Pedestrian Countdown Signal Head Installation Project involved the installation of pedestrian countdown signal heads at various signalized intersections throughout the city. This federally funded project was administered under the HSIP Program (HSIPL-5130(022), Cycle 9 H9-07- 001) and required strict adherence to Caltrans Local Assistance Procedures Manual (LAPM) guidelines. The project aimed to enhance pedestrian safety by improving signal visibility and ensuring clearer countdown indic ators for crossing pedestrians.

By implementing these improvements at key intersections, the project contributed to increased public safety, reduced accidents, and improved traffic flow throughout the city. The successful completion of this project reflects the City's commitment to providing safer and more efficient roadways for its community.

CITY OF ALHAMBRA , FY 19-20, 20-21, AND 21- 22 STREET REHABILITATION PROJECTS |The City of Alhambra’s multi -year Street Rehabilitation Projects aimed to enhance roadway infrastructure across various local street segments over three fiscal years. These projects involved comprehensive pavement rehabilitation and concrete improvements for a total of 68 local street segments. Each project was designed to improve accessibility, enhance pavement conditions, and ensure compliance with ADA standards. The scope of work included pavement resurfacing, application of slurry seal treatments, varying depths of cold milling and asphalt overlay, and full-depth pavement removal and reconstruction. Concrete improvements involved the removal and replacement of broken and off -grade sidewalks, curb and gutter repairs, ADA curb ramp upgrades, and the reconstruction of concrete cross gutters and driveway aprons.

CITY OF COMPTON, ANNUAL RESIDENTIAL STREET REHABILITATION PROJECT, PHASES 1 & 2A | This project involved extensive roadway and pavement rehabilitation, along with significant infrastructure upgrades. The scope includes asphalt overlay, concrete improvements, and construction staging, especially at heavily traveled intersections. Additional work comprises traffic control, clearing and grubbing, SWPPP preparation, cold milling, and overlay applications. Pedestrian infrastructure improvements include PCC sidewalks, ADA- compliant enha ncements, pedestrian crossings, and speed humps. Further components include the application of slurry seal, HMA pavement, ARHM overlay, AC base course, aggregate base, and full-depth AC slot pavement.

Zack Faqih, PE, QSD/P, CBO
Senior Construction Manager

EDUCATION
» MSCE - Structures
Cal State Fullerton 2005
» BSCE - Civil /Transportation
Cal State LA 1985

LICENSES & REGISTRATION
» Professional Engineer, P.E.

State of California, C57958
» Certified Accessibility
Inspector/Plans Examiner
» Certified Building Official,
C.B.O., CABO, ICC #3741
» Certified Plans Examiner,
I.C.B.O., #1020345-60
» Certified Mechanical
Inspector
I.C.B.O. #1020345-40
» Certified Plumbing Inspector
I.C.B.O. #1020345-30
» Certified Electrical Inspector
I.C.B.O. #1020345-20
» SWPPP (QSD) & (QSP)
#22055
» OSHA 30 Hour Certification
» State Certified HERS Rater
» Certified Emergency
Inspector
» C.G.B.P Certified Green
Building Inspector
» Certified Special Inspector for
Fire Proofing
» Certified Special Inspector for
Structural Welding
» Certified Special Inspector for
Structural Steel
» Certified Special Inspector for
Reinforced Concrete

Regular City Council Meeting - May 15, 2025

Page 305 of 583 ends

CITY OF COSTA MESA, CITYWIDE PARKWAY MAINTENANCE, STREET REHAB, AND SLURRY SEAL PROJECT | This citywide street improvement program in the City of Costa Mesa includes extensive street and intersection improvements, ADA ramp upgrades, and the installation of conduit and traffic signal enhancements. The project scope involves mobilization, constru ction of curb and gutters, sidewalks, driveway approaches, spandrels, cross gutters, and adjustments of manholes and utility covers. Additional work includes procurement and application of Type II slurry seal, crack sealing, installation of traffic signs, striping, pavement markings, traffic markers, speed humps, and the implementation of comprehensive traffic control measures.

CITY OF EL SEGUNDO , EL SEGUNDO BOULEVARD IMPROVEMENT PROJECT, PW 23 -02 | The El Segundo Boulevard Improvement Project in the City of El Segundo enhances roadway conditions, traffic flow, and safety along key corridors. The project involves pavement rehabilitation on El Segundo Boulevard (Illinois Street to Isis Avenue) and Nash Street (El Segundo Boulevard to Imperial Highway) using a cement-stabilized base with an asphalt overlay, requiring traffic detours. Key improvements include new traffic signals, ADA-compliant curb ramps at multiple intersections, and upgraded bicycle infrastructure with 1,020 linear feet of cycle track, 27,450 linear feet of Class II bike lanes, and Class III bike route markings (Sharrows). These upgrades improve mobility, enhance safety, and create a more accessible transportation network for all road users.

CITY OF IRWINDALE, 2021-2022 RESURFACING PROJECT |The 2021-2022 Resurfacing Project in the City of Irwindale focused on extensive street resurfacing and infrastructure upgrades to improve roadway safety and functionality. The project included street resurfacing with cold milling and asphalt concrete (AC) overlay, construction of new curbs and gutters, and installation of PCC sidewalks. Key components also involved the installation and configuration of multiple traffic loop detectors, installation of city project signage, preservation of existing city survey monuments, adjustments of manhole and utility covers to grade, and the application of pavement markings and striping. Additional work involved mobilization, traffic control measures, preparation of NPDES compliance plans, coordination with local utilities, and geotechnical and materials testing.

CITY OF LAGUNA BEACH, ZONES 5 & 11A STREET SLURRY SEAL AND REHABILITATION PROJECT | The Zones 5 & 11A Street Slurry Seal and Rehabilitation Project for the City of Laguna Beach involves comprehensive road surface improvements on El Toro Road (Zone 5) and the Diamond -Crestview neighborhoods (Zone 11A). The scope includes mobilization, clearing, and grubbing; saw-cutting and removing damaged asphalt concrete (A.C.) pavement; grinding and overlaying sections with new A.C. pavement; and applying both Type I and Type II slurry seals. Additional tasks involve the replacement of A.C. berms and curbs, installing Caltrans traffic loops, sealing pavement cracks, conducting stor mwater pollution prevention measures, updating pavement striping and markings, and making necessary utility adjustments. These enhancements aim to improve roadway durability, safety, and aesthetics, ensuring smoother and safer travel for motorists and pedestrians alike.

CITY OF MANHATTAN BEACH, CYCLE 2 STREET IMPROVEMENT PROJECT | The Cycle 2 Street Resurfacing Project in the City of Manhattan Beach is a Public Works initiative designed to improve roadway infrastructure across seven key street segments, totaling approximately 6,820 linear feet. The project encompasses 27th Street fr om Laurel Avenue to Pacific Avenue, Agnes Road from 29th Street to Marine Avenue, Flournoy Road from Ardmore Avenue to 19th Street, 29th Street from Blanche Road to Agnes Road, Flournoy Drive fr om Valley Drive to 33rd Street, Marine Avenue from Blanche Road to Valley Drive, and 14th Street from Pacific Avenue to Laurel Avenue. For five of these segments, the scope includes constructing rolled curbs and gutters, pavement removal, and new pavement installation. The remaining two segments involve milling the existing pavement surface and applying a new asphalt rubber surface course over pavement fabric.

CITY OF MORENO VALLEY, 801-0081 CITYWIDE PAVEMENT REHABILITATION PROJECT | This project is a citywide rehabilitation of Moreno Valley City streets, involving various pavement and infrastructure improvements. The scope includes cold milling to a depth of 1.5 inches, placing a 1.5 -inch asphalt rubber hot mix (ARHM) overlay, curb ramp installations, curb and gutter replacements, cross gutters, and spandrels. It also includes full -depth asphalt removal and replacement, installation of traffic striping and markers, traffic signage, adjustments of existing utility manholes, and asphalt concrete overlay.

CITY OF NORWALK, CDBG LOCAL STREETS REHABILITATION PROJECT | The Local Streets Rehabilitation Project in the City of Norwalk, funded by the Community Development Block Grant (CDBG), focused on enhancing roadway and infrastructure conditions across designated local streets. The project scope included improvements to concrete features such as cross gutters, curbs and gutters, ADA-compliant curb ramps, and intersection upgrades. Additional work involved traffic signal enhancements, installation of bike lanes, coordination with underground utilities, conduit installation, and comprehensive pavement rehabilitation. The project emphasized safety and accessibility improvements, compliance with environmental standards, and efficient coordination with public utilities to support sustainable infrastructure development.

CITY OF ROSEMEAD, WALNUT GROVE AVE. RESURFACING PROJECT PHASE I | This project involved street resurfacing and widening of Walnut Grove Ave., from Marshall St. to Grand Ave. in the City of Rosemead. Improvements included roadway widening, intersection improvement, waterline installation, pavement improvements, ADA improvements, sidewalk repairs, traffic signal modification, storm drain improvements, sewer main improvements, and bike lanes.

Regular City Council Meeting - May 15, 2025

Page 306 of 583 ends

Mr. Tom Dawson brings over 28 years of experience in public works and capital improvement projects, with extensive expertise in construction management, inspection, project oversight, and contract administration. His diverse project background includes building construction, street improvements, traffic signal installations, and com munity park enhancements. Mr. Dawson has overseen projects featuring playground equipment installation, lighting and electrical systems, concrete upgrades, stormwater chamber systems, and landscaping improvements. His technical knowledge extends to specialized areas such as landfill remediation and methane gas system rehabilitation, where he has managed the collection, disposal, and implementation of remedial measures to protect habitable structures. Mr. Dawson is also experienced in the removal and disposa l of contaminated soil in accordance with environmental regulations.

A certified professional with numerous qualifications, Mr. Dawson holds credentials as a Building Plan Examiner, California Commercial Combination Inspector, Certified Building Official, and multiple ICC certifications for plumbing, mechanical, and electrical inspection. He is OSHA 30 -certified and has significant experience working on projects within Caltrans right -of-way (ROW), ensuring compliance with Greenbook standards, Caltrans specifications, and ADA requirements. As the former Deputy Building Official for the County of Orange for over 12 years, Mr. Dawson brings exceptional leadership and regulatory expertise to each project. His proactive approach to problem-solving, attention to detail, and commitment to delivering projects on time and within budget make him an invaluable asset to the project team.

PROJECT EXPERIENCE

CITY OF COMPTON, ANNUAL RESIDENTIAL STREET REHABILITATION PROJECT, PHASES 1 & 2A | This project involved extensive roadway and pavement rehabilitation, along with significant infrastructure upgrades. The scope includes asphalt overlay, concrete improvements, and construction staging, especially at heavily traveled intersections. Additional work included traffic control, clearing and grubbing, SWPPP preparation, cold milling, and overlay applications. Pedestrian infrastructure improvements include PCC sidewalks, ADA -compliant enhancements, pedestrian crossings, and speed humps. Further components include the application of slurry seal, HMA pavement, ARHM overlay, AC base course, and full-depth AC slot pavement.

CITY OF EL SEGUNDO , EL SEGUNDO BOULEVARD IMPROVEMENT PROJECT, PW 23 -02 | The El Segundo Boulevard Improvement Project in the City of El Segundo enhances roadway conditions, traffic flow, and safety along key corridors. The project involves pavement rehabilitation on El Segundo Boulevard (Illinois Street to Isis Avenue) and Nash Street (El Segundo Boulevard to Imperial Highway) using a cement-stabilized base with an asphalt overlay, requiring traffic detours. Key improvements include new traffic signals, ADA-compliant curb ramps at multiple intersections, and upgraded bicycle infrastructure with 1,020 linear feet of cycle track, 27,450 linear feet of Class II bike lanes, and Class III bike route markings (Sharrows).

CITY OF LAKE FOREST , STREET RESURFACING PROJECT | The Project involves the street resurfacing of Glenn Ranch Road from Portola Parkway to El Toro Road, as well as the slurry seal of and arterial slurry seal of Jeronimo and Muirlands from Los Alisos to Bake. Relevant project features include street resurfacing and re habilitation, application of slurry seal, grinding and overlay, cold milling, concrete improvements, ARHM pavement, AC base course, aggregate base, signing, striping, markings and pavement legends, removal and replacement of PCC curb ramps, removal and replacement of PCC sidewalk, bike lane traffic loops, Type E traffic loops, dig -outs, sewer and storm drain manhole adjustments, and water valves adjustments.

CITY OF SAN MARINO, STREET REHABILITATION PROGRAM PHASE 1 & 2 | The project included a wide range of improvements, such as roadway and pavement reconstruction, concrete enhancements, installation of cross gutters, curbs and gutters, curb ramps, and ADA-compliant upgrades. The work also covered cold milling of asphalt concrete pavement followed by resurfacing with hot mix asphalt (HMA) and asphalt rubber hot mix (ARHM). Additional tasks involved clearing and grubbing, localized pavement repairs, and replacement of impacted traffic striping, pavement markings, legends, loop detectors, and curb painting. Further improvements included driveways and driveway approaches, installation of speed humps, adjustment of utility frames and grates, inspection and replacement of sewer manholes, water valves, water meters, and storm drain manholes, as well as SWPPP preparation and implementation of temporary construction BMPs.

Thomas Dawson, CBO, ICC Certified
Senior Construction Inspector

LICENSES &

REGISTRATION
» International Code
Counsel Certifications
» Building Plan Examiner
» California Commercial
Combination Inspector
» California Commercial
Plumbing Inspector
» California Commercial
Mechanical Inspector
» California Residential
Mechanical Inspector
» California Residential
Electrical Inspector
» California Residential
Plumbing Inspector
» Certified Building Official
» CLB License No. 674861
» OSHA 30 Hr.

Regular City Council Meeting - May 15, 2025

Page 307 of 583 ends

Mr. Eddie Davalos brings over 25 years of extensive experience in public works inspection, construction management, and quality control for capital improvement projects. He has successfully delivered over 35 street improvement projects, showcasing his expertise in managing diverse infrastructure enhancements. His skill set spans street and intersection improvements, median upgrades, ADA -compliant ramp installations, and the development of bike lanes and bike trails. Mr. Davalos is highly experienced in overseeing key technical aspects of construction, including conduit installations, traffic signal upgrades, asphalt overlays, and construction staging. His ability to manage traffic control measures ensures minimal disruption to surrounding communities while maintaining project safety. In addition, Mr. Davalos has extensive experience in site preparation activities such as clearing and grubbing, SWPPP preparation, and utility coordination. He has successfully managed critical utility adjustments, including manhole and utility cover modifications, to ensure seamless integration with project improvements.

With a strong background in Caltrans standards, Federal Department of Labor regulations, and California Division of Labor Standards Enforcement protocols, Mr.

Davalos is adept at ensuring regulatory compliance and equal employment opportunity monitoring. He diligently oversees labor standards, prevailing wage requirements, and workforce diversity goals to ensure that projects meet all legal and contractual obligations. Mr. Davalos's commitment to quality control, safety, and proactive communication has consistently contributed to successful project outcomes. His ability to anticipate challenges, resolve issues efficiently, and maintain strong relationships with stakeholders makes him an invaluable asset to the City of Jurupa Valley’s infrastructure improvement projects.

PROJECT EXPERIENCE
CITY OF ALHAMBRA, FY 19-20, 20-21, AND 21 -22 STREET REHABILITATION PROJECTS |The City of Alhambra’s multi-year Street Rehabilitation Projects aimed to enhance roadway infrastructure across various local street segments over three fiscal years. These projects involved comprehensive pavement rehabilitation and concrete improvements f or a total of 68 local street segments. Each project was designed to improve accessibility, enhance pavement conditions, and ensure compliance with ADA standards. The scope of work included pavement resurfacing, application of slurry seal treatments, varying depths of cold milling and asphalt overlay, and full- depth pavement removal and reconstruction. Concrete improvements involved the removal and replacement of broken and off-grade sidewalks, curb and gutter repairs, ADA curb ramp upgrades, and the reconstruction of concrete cross gutters and driveway aprons. Additional elements included construction staging, installation of loop detectors, adjustment of manhole and utility covers to grade, and the installation of PCC sidewalks.

CITY OF CHINO, PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This Project includes street rehabilitation and slurry seal of various streets, including, Pipeline Ave from City Limits to City Limits, Chino Ave from City Limits to City Limits and Schaefer Ave from City Limits to City Limits. Scope of work includes pave ment improvements, street resurfacing, crack sealing, slurry seal, localized dig -outs, striping removal/install, and traffic loop detectors. Z&K provided preparation of submittal packages, scheduling, mark outs, meetings, cost control, reviewing RFIs, preparing change order proposals, permits, progress billings, subcontractor coordination, as -built drawings, and final walkthrough/closeout.

CITY OF MORENO VALLEY, 801-0081 CITYWIDE PAVEMENT REHABILITATION PROJECT | This project is a citywide rehabilitation of Moreno Valley City streets, involving various pavement and infrastructure improvements. The scope includes cold milling to a depth of 1.5 inches, placing a 1.5 -inch asphalt rubber hot mix (ARHM) overlay, curb ramp installations, curb and gutter replacements, cross gutters, and spandrels. It also includes full -depth asphalt removal and replacement, traffic striping and markers, traffic signage, adjustments of utility manholes, and asphalt concrete overlay.

CITY OF SAN BERNARDINO , STREET REHABILITATION PROGRAM (30+ MAJOR CITY STREETS) | The project encompasses extensive pavement and infrastructure improvements for over 30 major streets and multiple intersections across the city. This ongoing project includes roadway and pavement rehabilitation, concrete improvements, installation of cross gutters, curb and gutter replacement, curb ramps, ADA upgrades, and storm drain and pipeline relocations. Additional work involves traffic signal enhancements, comprehensive traffic control, full-depth asphalt removal and replacement, cold milling and AC overlay, slurry seal applications, PCC sidewalk installation, and replacement of existing PCC driveways, driveway approaches, curb ramps, retaining curbs, a 3-foot-high retaining wall, parkway culverts, and cross gutters.

Eddie Davalos
Senior Construction Inspector

LICENSES & REGISTRATION
» Citrus College, Covina, CA,
Public Works/Earth Work
» OSHA 30 Hour Construction
Safety & Health
» Sexual Harassment
Prevention Training
» Defensive Driving Training
» Caltrans Roadway Safety
Training
» Bridge Inspector Training
» Metro Rail Safety Training

Regular City Council Meeting - May 15, 2025

Page 308 of 583 ends

Mr. Tom Verpooten offers over 27 years of experience in construction management and inspection, with a focus on capital improvement projects. As a certified ICC and ACI professional, he has successfully managed over 40 infrastructure projects, including roadway rehabilitation, intersection improvements, raised and landscaped medians, and ADA -compliant upgrades. His extensive knowledge of public works projects includes storm drain systems, sewer and water pipelines, traffic signal installations, and pavement resurfacing.

Mr. Verpooten is highly skilled in ensuring compliance with Caltrans standards, Cal- OSHA safety regulations, and municipal specifications. He closely monitors construction activities to verify proper installation of street lighting, pavement markings, ADA curb ramps, and pedestrian crossings. His expertise in contract administration includes managing RFIs, submittals, and contract change orders to maintain progress and accountability.

In addition to his technical skills, Mr. Verpooten is an experienced field leader, actively coordinating with contractors, city staff, and utility providers to address project challenges. His proactive communication and commitment to public safety ensure construction activities proceed efficiently while minimizing disruptions to residents, businesses, and schools. With his comprehensive understanding of construct ion staging, traffic control, and environmental compliance, Mr. Verpooten plays a key role in delivering successful projects that align with client expectations and community needs.

PROJECT EXPERIENCE
CITY OF CARSON, CITYWIDE PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This project covers streets across all four districts within the City of Carson, focusing on essential infrastructure improvements for identified roadways, sidewalks, curb ramps, and related assets in need of repair. The scope of work includes traffic control, striping, pavement markings, cold milling, leveling course, asphalt rubber hot mix, installation of traffic loop detectors, concrete enhancements, and slurry sealing.

CITY OF COSTA MESA, CITYWIDE PARKWAY MAINTENANCE, STREET REHAB, AND SLURRY SEAL PROJECT | This citywide street improvement program in the City of Costa Mesa includes extensive street and intersection improvements, ADA ramp upgrades, and the installation of conduit and traffic signal enhancements. The project scope involves mobilization, constru ction of curb and gutters, sidewalks, driveway approaches, spandrels, cross gutters, and adjustments of manholes and utility covers. Additional work includes procurement and application of Type II slurry seal, crack sealing, installation of traffic signs, striping, pavement markings, traffic markers, speed humps, and the implementation of comprehensive traffic control measures.

CITY OF DOWNEY, WOODRUFF AVENUE PAVEMENT REHABILITATION PROJECT | The Woodruff Avenue Pavement Rehabilitation Project encompasses the rehabilitation of Woodruff Avenue between Firestone Boulevard and Washburn Road in the City of Downey, California. This includes extensive pavement reconstruction, involving the repair of failed pavement areas, cold milling of existing asphalt, and the installation of both asphalt concrete (AC) base course and asphalt rubber hot mix (ARHM) overlay. Additionally, the project addresses uplifted or damaged concrete infrastructure by replacing substandard curbs, gutters, sidewalks, and driveways to ensure safety and ADA compliance. Enhancements also include the installation of steel conduits and single -mode fiber optic cables for improved communication infrastructure. The work will be completed with adjustments to manhole and valve covers, updated traffic striping and markings, and a comprehensive traffic control plan. This project aims to improve road safety, durability, and overall accessibility for residents and commuters.

CITY OF LAGUNA BEACH, ZONES 5 & 11A STREET SLURRY SEAL AND REHABILITATION PROJECT | The Zones 5 & 11A Street Slurry Seal and Rehabilitation Project for the City of Laguna Beach involves comprehensive road surface improvements on El Toro Road (Zone 5) and the Diamond -Crestview neighborhoods (Zone 11A). The scope includes mobilization, clearing, and grubbing; saw-cutting and removing damaged asphalt concrete (A.C.) pavement; grinding and overlaying sections with new A.C. pavement; and applying both Type I and Type II slurry seals. Additional tasks involve the replacement of A.C. berms and curbs, installing Caltrans traffic loops, sealing pavement cracks, conducting stormwater pollution prevention measures, updating pavement striping and markings, and making necessary utility adjustments. These enhancements aim to improve roadway durability, safety, and aesthetics, ensuring smoother and safer travel for motorists and pedestrians alike.

LICENSES & REGISTRATION
» ICC Soils Special Inspector
» ICC Commercial Building
Inspector
» Caltrans Various Certifications
» QSP
» 30 Cal/OSHA
» Confined Space Training
» Fall Protection
» Traffic Control Safety

Tom Verpooten, QSP, ICC Cert.

Senior Construction Inspector
Regular City Council Meeting - May 15, 2025

Page 309 of 583 ends

Mr. Jimmy Martin brings over 27 years of experience in construction inspection, specializing in roadway rehabilitation, street improvements, and infrastructure upgrades. Jimmy will play a key role in ensuring successful project delivery through his extensive technical expertise and proactive oversight.

His responsibilities will include overseeing cold milling, asphalt pavement removal and reconstruction, ARAM interlayer and ARHM overlays, curb and gutter replacement, ADA curb ramp installations, signing and striping, and traffic signal modifications. Jimmy will conduct daily field inspections to ensure all work aligns with contract document s, Caltrans standards, and City specifications.

Jimmy’s role also involves contractor oversight, quality control monitoring, and strict adherence to safety protocols. He will document project progress, track material usage, review RFIs and submittals, and coordinate with contractors, utility agencies, and City representatives to resolve issues efficiently and maintain project momentum. With experience delivering over 25 successful street improvement projects, Jimmy’s comprehensive knowledge of municipal roadway construction makes him well-equipped to manage field operations with precision.

His strong attention to detail, proactive communication skills, and commitment to quality assurance will ensure the project is completed on time, within budget, and to the highest standards of workmanship. Jimmy’s expertise in field coordination and problem-solving makes him an invaluable asset to the project team.

PROJECT EXPERIENCE

CITY OF CARSON, CITYWIDE PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This project covers streets across all four districts within the City of Carson, focusing on essential infrastructure improvements for identified roadways, sidewalks, curb ramps, and related assets in need of repair. The scope of work includes traffic control, striping, pavement markings, cold milling, leveling course, asphalt rubber hot mix, installation of traffic loop detectors, concrete enhancements, and slurry sealing.

CITY OF CORONA, CORONA GREEN ALLEYS IMPROVEMENT PROJECT | The Project aimed to transform selected alleyways in the City into environmentally friendly, functional, and sustainable public spaces. This project includes extensive surface improvements, installation of permeable pavements, and stormwater management features to enhance water quality and reduce urban runoff. Key elements of the work involve unclassified excavation, installation of aggregate base and porous asphalt, sidewalk and driveway construction, and the implementation of landscape elements like green infrastructure and solar lighting fixtures. The project incorporates drainage improvements and sustainable infrastructure elements to reduce the heat island effect, create safe pedestrian zones, and improve aesthetics.

CITY OF MANHATTAN BEACH, MANHATTAN BEACH BOULEVARD IMPROVEMENTS PROJECT | The Manhattan Beach Boulevard Improvements Project addressed critical safety and traffic flow concerns at the intersection of Manhattan Beach Boulevard and Pacific Avenue. The project focused on improving traffic efficiency by reconfiguring the intersectio n to optimize vehicle movement and reduce congestion. With significant westbound traffic demand and limited merging space creating frequent delays and sudden braking, the project introduced key upgrades to enhance safety and flow.

Improvements included the installation of new traffic signal systems designed to support dedicated left-turn pockets in both directions, effectively reducing peak-hour congestion. Additionally, the redesigned intersection improved merging distances, allowing for smoother transitions and minimizing abrupt stops. These enhancements were designed to improve accessibility, safety, and long-term functionality for residents, commuters, and visitors.

CITY OF NORWALK, CDBG LOCAL STREETS REHABILITATION PROJECT | The Local Streets Rehabilitation Project in the City of Norwalk, funded by the Community Development Block Grant (CDBG), focused on enhancing roadway and infrastructure conditions across designated local streets. The project scope included improvements to concrete features such as cross gutters, curbs and gutters, ADA-compliant curb ramps, and intersection upgrades. Additional work involved traffic signal enhancements, installation of bike lanes, coordination with underground utilities, conduit installation, and comprehensive pavement rehabilitation. The project emphasized safety and accessibility improvements, compliance with environmental standards, and efficient coordination with public utilities to support sustainable infrastructure development.

Jimmy Martin, ACI, ICC Cert.

Senior Construction Inspector

LICENSES & REGISTRATION
» ICC Soils Special Inspector
» ICC Reinforced Concrete
Inspector
» Caltrans Various Certifications »
Nuclear Gauge Certification
» ACI Field Technician Grade 1 » 30
Cal/OSHA
» Confined Space Training
» Traffic Control Technician and
Traffic Control Flagger
» Certified California Journeyman
Laborer (AGC)
» Pervious Concrete Technician
(NRMCA)
» Carpentry
» Cement Mason
» Fall Protection
» Traffic Control Safety

Regular City Council Meeting - May 15, 2025

Page 310 of 583 ends

Thomas "Tommy" Russell brings over 25 years of specialized experience in street rehabilitation, traffic signal modifications, and roadway infrastructure projects. Tommy will provide expert oversight in managing electrical installations, traffic signal upgrades, and ITS system improvements. His extensive background in electrical work, coupled with his comprehensive knowledge of construction inspection and quality assurance, makes him uniquely suited to ensure the success of these projects.

With a strong understanding of Caltrans Standard Specifications, Greenbook guidelines, and municipal construction requirements, Tommy ensures that all construction activities adhere to industry best practices, safety protocols, and regulatory compliance. His proactive problem -solving, technical expertise, and leadership in the field will contribute to the successful execution of this project, ensuring the City of Norwalk receives high -quality infrastructure improvements completed on time and within budget.

For this assignment, Tommy will oversee critical project elements such as traffic signal modifications, fiber optic communication installations, electrical system upgrades, and pedestrian safety enhancements. His responsibilities include conducting daily site inspections, verifying contractor compliance with project specifications, monitoring material quality, and docum enting progress to maintain accountability. Tommy will work closely with City staff, traffic maintenance teams, and utility agencies to resolve field issues efficiently, minimizing disruptions to residents and businesses.

With experience delivering over 60 successful traffic signal and infrastructure improvement projects, Tommy’s expertise spans fiber optic installations, ITS integration, pavement rehabilitation, and ADA accessibility upgrades. His background also includes storm drain improvements, trenching and excavation safety, and the implementation of advanced traffic control measures to support public safety.

PROJECT EXPERIENCE
CITY OF ALHAMBRA, PEDESTRIAN COUNTDOWN SIGNAL HEAD INSTALLATION PROJECT | The City of Alhambra Pedestrian Countdown Signal Head Installation Project involved the installation of pedestrian countdown signal heads at various signalized intersections throughout the city. This federally funded project was administered under the HSIP Program (HSIPL-5130(022), Cycle 9 H9 -07-001) and required strict adherence to Caltrans Local Assistance Procedures Manual (LAPM) guidelines. The project aimed to enhance pedestrian safety by improving signal visibility and ensuring clearer countdown indicators for crossing pedestrians. By implementing these improvements at key intersections, the project contributed to increased public safety, reduced accidents, and improved traffic flow throughout the city. The successful completion of this project reflects the City's commitment to providing safer and more efficient roadways for its community.

CITY OF CATHEDRAL CITY, TRAFFIC SIGNAL IMPROVEMENTS AT 12 INTERSECTIONS PROJECT | The Traffic Signal Improvements at 12 Intersections Project in the City of Cathedral City was designed to enhance traffic safety and improve pedestrian accessibility at key intersections throughout the city. Funded through the Highway Safety Improvement Program (HSIP), this project implemented several crucial upgrades to improve overall roadway safety. Key improvements included the installation of advanced dilemma zone detection systems to reduce accident risks at signalized intersections and the introduction of protected left-turn phases to improve turning safety and minimize conflicts with oncoming traffic. To further enhance pedestrian safety, pedestrian countdown signal heads were installed to provide clear and reliable crossing information.

CITY OF PALM SPRINGS, HSIP CYCLE 9 TRAFFIC SIGNAL MODIFICATIONS (NINE INTERSECTIONS) PROJECT | The HSIP Cycle 9 Traffic Signal Modifications Project in the City of Palm Springs was initiated to enhance traffic safety and pedestrian accessibility at nine signalized intersections across the city. This federally funded project introduced several critical improvements to enhance roadway safety and improve intersection functionality. Key upgrades included the modification of existing traffic signals to improve v isibility, installation of advanced dilemma zone detection systems to reduce potential collisions, and the addition of protected left -turn phases to improve turning safety. To further enhance pedestrian safety, pedestrian countdown signal heads were installed to provide clear crossing information.

Thomas Russell, Journeyman Electrician
,,,

Senior Traffic Signal/Electrical Specialist

LICENSES & REGISTRATION
» Electrical Training apprenticeship
IBEW Local 441 City of Orange,
California
» Journeyman Electrician, State
Certified GPA (3.0)
» 30-Hr Cal/OSHA
» Fall Protection
» Traffic Control Safety
» Sexual Harassment Prevention
Training
» Defensive Driving Training
» Caltrans Roadway Safety
Training
» Bridge Inspector Training
» Metro Rail Safety Training

Regular City Council Meeting - May 15, 2025

Page 311 of 583 ends

Brittany Duhn, PE, QSD/P, will serve as the Project Manager/Contract Managerb for the City of Jurupa Valley’s Projects. With extensive experience in project management, construction oversight, and contract administration, Brittany specializes in delivering street improvement projects, coordinating utility relocations, and ensuring environmental compliance.

For these projects, Brittany will manage construction documentation, progress tracking, and coordination between the contractor, City staff, and regulatory agencies. She will ensure that all aspects of the projects —including asphalt rehabilitation, curb an d gutter replacement, ADA -compliant ramp installations, pavement striping, and traffic signal improvements —are executed according to contract specifications, Caltrans standards, and City requirements. Brittany’s technical expertise in cost control, schedule management, and quality assurance will ensure each project stays on track and within budget.

With a proactive and detail -oriented approach, Brittany will facilitate effective communication among stakeholders, addressing potential issues early to prevent delays. Her strong background in stormwater regulations, SWPPP compliance, and permitting ensures environmental considerations are effectively managed throughout construction.

Brittany’s collaborative leadership, technical proficiency, and commitment to maintaining project momentum make her a key asset in ensuring the successful delivery of these critical infrastructure improvements for the City of Jurupa Valley.

PROJECT EXPERIENCE
CITY OF ALHAMBRA, PEDESTRIAN COUNTDOWN SIGNAL HEAD INSTALLATION PROJECT | The City of Alhambra Pedestrian Countdown Signal Head Installation Project involved the installation of pedestrian countdown signal heads at various signalized intersections throughout the city. This federally funded project was administered under the HSIP Program (HSIPL-5130(022), Cycle 9 H9 -07-001) and required strict adherence to Caltrans Local Assistance Procedures Manual (LAPM) guidelines. The project aimed to enhance pedestrian safety by improving signal visibility and ensuring clearer countdown indicators for crossing pedestrians. By implementing these improvements at key intersections, the project contributed to increased public safety, reduced accidents, and improved traffic flow throughout the city. The successful completion of this project reflects the City's commitment to providing safer and more efficient roadways for its community.

CITY OF ALHAMBRA, FY 19-20, 20-21, AND 21 -22 STREET REHABILITATION PROJECTS |The City of Alhambra’s multi-year Street Rehabilitation Projects aimed to enhance roadway infrastructure across various local street segments over three fiscal years. These projects involved comprehensive pavement rehabilitation and concrete improvements f or a total of 68 local street segments. Each project was designed to improve accessibility, enhance pavement conditions, and ensure compliance with ADA standards. The scope of work included pavement resurfacing, application of slurry seal treatments, varying depths of cold milling and asphalt overlay, and full-depth pavement removal and reconstruction. Concrete improvements involved the removal and replacement of broken and off-grade sidewalks, curb and gutter repairs, ADA curb ramp upgrades, and the reconstruction of concrete cross gutters and driveway apr ons. Additional elements included construction staging, installation of loop detectors, adjustment of manhole and utility covers to grade, and the installation of PCC sidewalks.

CITY OF CARSON, CITYWIDE PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This project covers streets across all four districts within the City of Carson, focusing on essential infrastructure improvements for identified roadways, sidewalks, curb ramps, and related assets in need of repair. The scope of work includes traffic control, striping, pavement markings, cold milling, leveling course, asphalt rubber hot mix, installation of traffic loop detectors, concrete enhancements, and slurry sealing.

CITY OF COMPTON, ANNUAL RESIDENTIAL STREET REHABILITATION PROJECT, PHASES 1 & 2A | This project involved extensive roadway and pavement rehabilitation, along with significant infrastructure upgrades. The scope includes asphalt overlay, concrete improvements, and construction staging, especially at heavily traveled intersections. Additional work comprises traffic control, clearing and grubbing, SWPPP preparation, cold milling, and overlay applications. Pedestrian infrastructure improvements include PCC sidew alks, ADA- compliant enhancements, pedestrian crossings, and speed humps. Further components include the application of slurry seal, HMA pavement, ARHM overlay, AC base course, aggregate base, and full-depth AC slot pavement.

EDUCATION
» BSCE – Civil Engineering
California State Polytechnic
University, Pomona

LICENSES & REGISTRATION
» Professional Engineer,
P.E. State of California, #91078
» SWPPP (QSD) & (QSP)
Certificate # 22055
» OSHA 30 Hour

Brittany Duhn, PE, QSD/QSP

Project Manager/Contract Manager

Regular City Council Meeting - May 15, 2025

Page 312 of 583 ends

CITY OF COSTA MESA, CITYWIDE PARKWAY MAINTENANCE, STREET REHAB, AND SLURRY SEAL PROJECT | This citywide street improvement program in the City of Costa Mesa includes extensive street and intersection improvements, ADA ramp upgrades, and the installation of conduit and traffic signal enhancements. The project scope involves mobilization, construction of curb and gut ters, sidewalks, driveway approaches, spandrels, cross gutters, and adjustments of manholes and utility covers. Additional work includes procurement and application of Type II slurry seal, crack sealing, installation of traffic signs, striping, pavement markings, traffic markers, speed humps, and the implementation of comprehensive traffic control measures.

CITY OF EL SEGUNDO , EL SEGUNDO BOULEVARD IMPROVEMENT PROJECT, PW 23 -02 | The El Segundo Boulevard Improvement Project in the City of El Segundo enhances roadway conditions, traffic flow, and safety along key corridors. The project involves pavement rehabilitation on El Segundo Boulevard (Illinois Street to Isis Avenue) and Nash Street (El Segundo Boulevard to Imperial Highway) using a cement-stabilized base with an asphalt overlay, requiring traffic detours. Key improvements include new traffic signals, ADA-compliant curb ramps at multiple intersections, and upgraded bicycle infrastructure with 1,020 linear feet of cycle track, 27,450 linear feet of Class II bike lanes, and Class III bike route markings (Sharrows). These upgrades improve mobility, enhance sa fety, and create a more accessible transportation network for all road users.

CITY OF IRWINDALE, 2021-2022 RESURFACING PROJECT |The 2021-2022 Resurfacing Project in the City of Irwindale focused on extensive street resurfacing and infrastructure upgrades to improve roadway safety and functionality. The project included street resurfacing with cold milling and asphalt concrete (AC) overlay, construction of new curbs and gutters, and installation of PCC sidewalks. Key components also involved the installation and configuration of multiple traffic loop detectors, installation of city project signage, preservation of existing city survey monuments, adjustments of manhole and utility covers to grade, and the application of pavement markings and striping. Additional work involved mobilization, traffic control measures, preparation of NPDES compliance plans, coordination with local utilities, and geotechnical and materials testing.

CITY OF LAGUNA BEACH, ZONES 5 & 11A STREET SLURRY SEAL AND REHABILITATION PROJECT | The Zones 5 & 11A Street Slurry Seal and Rehabilitation Project for the City of Laguna Beach involves comprehensive road surface improvements on El Toro Road (Zone 5) and the Diamond -Crestview neighborhoods (Zone 11A). The scope includes mobilization, clearing, and grubbing; saw-cutting and removing damaged asphalt concrete (A.C.) pavement; grinding and overlaying sections with new A.C. pavement; and applying both Type I and Type II slurry seals. Additional tasks involve the replacement of A.C. berms and curbs, installing Caltrans traffic loops, sealing pavement cracks, conducting stormwater pollution prevention measures, updating pavement striping and markings, and making necessary utility adjustments. These enhancements aim to improve roadway durability, safety, and aesthetics, ensuring smoother and safer travel for motorists and pedestrians alike.

CITY OF LAKE FOREST , STREET RESURFACING PROJECT | The Project involves the street resurfacing of Glenn Ranch Road from Portola Parkway to El Toro Road, as well as the slurry seal of and arterial slurry seal of Jeronimo and Muirlands from Los Alisos to Bake. Relevant project features include street resurfacing and re habilitation, application of slurry seal, grinding and overlay, cold milling, concrete improvements, ARHM pavement, AC base course, aggregate base, signing, striping, markings and pavement legends, removal and replacement of PCC curb ramps, removal and replacement of PCC sidewalk, bike lane traffic loops, Type E traffic loops, dig -outs, sewer and storm drain manhole adjustments, and water valves adjustments.

CITY OF MANHATTAN BEACH, CYCLE 2 STREET IMPROVEMENT PROJECT | The Cycle 2 Street Resurfacing Project in the City of Manhattan Beach is a Public Works initiative designed to improve roadway infrastructure across seven key street segments, totaling approximately 6,820 linear feet. The project encompasses 27th Street fr om Laurel Avenue to Pacific Avenue, Agnes Road from 29th Street to Marine Avenue, Flournoy Road from Ardmore Avenue to 19th Street, 29th Street from Blanche Road to Agnes Road, Flournoy Drive fr om Valley Drive to 33rd Street, Marine Avenue from Blanche Road to Valley Drive, and 14th Street from Pacific Avenue to Laurel Avenue. For five of these segments, the scope includes constructing rolled curbs and gutters, pavement removal, and new pavement installation.

CITY OF MORENO VALLEY, 801-0081 CITYWIDE PAVEMENT REHABILITATION PROJECT | This project is a citywide rehabilitation of Moreno Valley City streets, involving various pavement and infrastructure improvements. The scope includes cold milling to a depth of 1.5 inches, placing a 1.5 -inch asphalt rubber hot mix (ARHM) overlay, curb ramp installations, curb and gutter replacements, cross gutters, and spandrels. It also includes full -depth asphalt removal and replacement, installation of traffic striping and markers, traffic signage, adjustments of existing utility manholes, and asphalt concrete overlay.

CITY OF NORWALK, CDBG LOCAL STREETS REHABILITATION PROJECT | The Local Streets Rehabilitation Project in the City of Norwalk, funded by the Community Development Block Grant (CDBG), focused on enhancing roadway and infrastructure conditions across designated local streets. The project scope included improvements to concrete features such as cross gutters, curbs and gutters, ADA-compliant curb ramps, and intersection upgrades. Additional work involved traffic signal enhancements, installation of bike lanes, coordination with underground utilities, conduit installation, and comprehensive pavement rehabilitation. The project emphasized safety and accessibility improvements, compliance with environmental standards, and efficient coordination with public utilities to support sustainable infrastructure development.

Regular City Council Meeting - May 15, 2025

Page 313 of 583 ends

APPENDIX B. FORMS
Regular City Council Meeting - May 15, 2025

Page 314 of 583 ends

EXHIBIT A

CITY OF JURUPA VALLEY
PROPOSER’S SIGNATURE

CONSTRUCTION MANAGEMENT SERVICES

The undersigned, having become familiar with the local conditions affecting the cost of work, hereby proposes to furnish all management, tools, supplies, equipment, material, transportation, and labor service necessary to perform and all work performed under any contract resulting from this proposal.

By submission of this proposal, the undersigned certifies that this proposal has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this proposal with any other proposer or competitor.

[THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]
Regular City Council Meeting - May 15, 2025

Page 315 of 583 ends

Regular City Council Meeting - May 15, 2025

Page 316 of 583 ends

Regular City Council Meeting - May 15, 2025

Page 317 of 583 ends

EXHIBIT B

NON-COLLUSION DECLARATION TO BE

EXECUTED BY PROPOSER AND SUBMITTED WITH PROPOSAL
The undersigned declares:

I am the [Declarant’s title] of , the party making the foregoing Proposal.

The Proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Proposal is genuine and not collusive or sham.

The Proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal. The Proposer has not directly or indirectly colluded, conspired, connived, or agreed with any proposer or anyone else to put in a sham proposal, or to refrain from proposing. The Proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Proposal price of the Proposer or any other proposer, or to fix any overhead, profit, or cost element of the Proposal price, or of that of any other proposer. All statements contained in the Proposal are true. The Proposer has not, directly or indirectly, submitted his or her Proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, proposal depository, or to any member or agent thereof, to effectuate a collusive or sham Proposal, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Proposer that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Proposer.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [date], at [city], [state].

Signature:

Print Name:

Title:

Address:

Telephone No:

Crystal Fraire
President
17130 Van Buren Blvd, Suite 122, Riverside, CA, 92504
(951) 310-7470
President Z&K Consultants
March 12, 2025
Riverside California
Regular City Council Meeting - May 15, 2025

Page 318 of 583 ends

-16-
Request for Proposals Construction Management Services

EXHIBIT C

LIST OF REFERENCES

ON-CALL CONSTRUCTION MANAGEMENT SERVICES
PROPOSER:

REFERENCES
Following are the names, addresses and telephone numbers for three (3) public agencies for which PROPOSER has performed similar work within the past two (2) years:

1. Name, Title, and Telephone Number of Person Familiar with Project Annual Contract Amount Type of Work Date Completed

2. Name and Address of Agency
Name, Title, and Telephone Number of Person Familiar with Project Annual Contract Amount Type of Work Date Completed

3. Name and Address of Agency
Name, Title, and Telephone Number of Person Familiar with Project Annual Contract Amount Type of Work Date Completed
Z&K Consultants, Inc.

Name and Address of Agency
Cheryl Ebert, PE, Senior Civil Engineer, (310) 524-2321 City of El Segundo | 350 Main Street, El Segundo, CA 90245 Nazila Mokarram, Principal Civil Engineer, (949) 461-3490 City of Lake Forest | 100 Civic Center Drive, Lake Forest, CA 92630 Arlington Rodgers, Public Works Director, (310) 847-3500 City of Carson | 18620 S Broadway, Carson, CA 90248
N/A - ongoing
N/A - ongoing
N/A - ongoing
CM, Inspection, and Material Testing Services for
Pavement Rehabilitation Projects
CM, Inspection, and Material Testing Services for Street Improvement and Slurry Seal Projects
CM, Inspection, and Material Testing Services for Street Improvement Projects
Cheryl Ebert, PE, City Engineer, (310) 524-2321
$500,000
$1,700,000
$700,000
Additional references are available upon request. Z&K has also recently completed street improvement and pavement rehabilitation projects for the City of Eastvale, City of Corona, City of Norco, and City of Fontana.

Regular City Council Meeting - May 15, 2025

Page 319 of 583 ends

-17-
Request for Proposals Construction Management Services

EXHIBIT D

REQUIRED SUBCONSULTANT INFORMATION
NAME LICENSE NO. AND CLASSIFICATION

TELEPHONE
DESCRIPTION OF WORK CONTRACTED: ADDRESS

CITY, ZIP
NAME LICENSE NO. AND CLASSIFICATION
TELEPHONE DESCRIPTION OF WORK CONTRACTED:

ADDRESS

CITY, ZIP
NAME LICENSE NO. AND CLASSIFICATION
TELEPHONE DESCRIPTION OF WORK CONTRACTED:

ADDRESS

CITY, ZIP
Converse Consultants
909-474-2847
2021 Rancho Dr., Suite 1
Redlands, CA 92373
Material Testing &
Geotechnical Services
Converse holds many licenses and
certifications to assist with any
project.

Regular City Council Meeting - May 15, 2025

Page 320 of 583 ends

Regular City Council Meeting - May 15, 2025

Page 321 of 583 ends

Regular City Council Meeting - May 15, 2025

Page 322 of 583 ends

Regular City Council Meeting - May 15, 2025

Page 323 of 583 ends

EXHIBIT B

NON-COLLUSION DECLARATION TO BE

EXECUTED BY PROPOSER AND SUBMITTED WITH PROPOSAL
The undersigned declares:

I am the [Declarant’s title] of , the party making the foregoing Proposal.

The Proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Proposal is genuine and not collusive or sham.

The Proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal. The Proposer has not directly or indirectly colluded, conspired, connived, or agreed with any proposer or anyone else to put in a sham proposal, or to refrain from proposing. The Proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Proposal price of the Proposer or any other proposer, or to fix any overhead, profit, or cost element of the Proposal price, or of that of any other proposer. All statements contained in the Proposal are true. The Proposer has not, directly or indirectly, submitted his or her Proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, proposal depository, or to any member or agent thereof, to effectuate a collusive or sham Proposal, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Proposer that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Proposer.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [date], at [city], [state].

Signature:

Print Name:

Title:

Address:

Telephone No:

Principal in Charge
Converse
Consultants
Hashmi Quazi
Principle in Charge
2021 Rancho Drive, Ste. 1, Redlands, CA 92373
909-474-2847
03/12/2025
Redlands California
Regular City Council Meeting - May 15, 2025

Page 324 of 583 ends

EXHIBIT C

LIST OF REFERENCES

CONSTRUCTION MANAGEMENT SERVICES
PROPOSER:

REFERENCES
Following are the names, addresses and telephone numbers for three (3) public agencies for which PROPOSER has performed similar work within the past two (2) years:

1. Name and Address of Agency
Name, Title, and Telephone Number of Person Familiar with Project Annual Contract Amount Type of Work Date Completed

2. Name and Address of Agency
Name, Title, and Telephone Number of Person Familiar with Project Annual Contract Amount Type of Work Date Completed

3. Name and Address of Agency
Name, Title, and Telephone Number of Person Familiar with Project Annual Contract Amount Type of Work Date Completed
Converse Consultants
City of Beaumont, 550 E. 6th Street, Beaumont, CA 92223 Dustin Christensen, Project Engineer, 951-572-3192
$21,000.00 Geotechnical Material Testing & Inspection May 2024 City of Corona, 400 S. Vicentia Ave., Corona, CA 92882
Ismael Rivera, Project Engineer, 951-739-2304
$92,670.00 March 2024Geotechnical Material Testing & Inspection City of La Quinta, 78495 Calle Tampico, La Quinta, CA 92253 Ubaldo Ayon, Jr., Construction Manager, 760-275-2789
Geotechnical Material Testing & Inspection January 2024$41,725.00 Regular City Council Meeting - May 15, 2025

Page 325 of 583 ends

APPENDIX C. CERTIFICATIONS
Regular City Council Meeting - May 15, 2025

Page 326 of 583 ends

October 14, 2020 CUCP# 41235
Metro File #6184

Ms. Crystal Faqih
Z&K Consultants, Inc.
22295 Jessamine Way
Corona, CA 92883

Subject:

Disadvantaged Business Enterprise Certification

Dear Ms. Crystal Faqih:

We are pleased to advise you that after careful review of your application and supporting documentation, the Los Angeles County Metropolitan Transportation Authority (Metro) has determined that your firm meets the eligibility standards to be certified as a Disadvantaged Business Enterprise (DBE) as required under the U.S. Department of Transportation (U.S. DOT) Regulation 49 CFR Part 26, as amended. This certification will be recognized by all of the U.S. DOT recipients in California. Your firm will be listed in the California Unified Certification Program (CUCP) database of certified DBEs under the following specific area(s) of expertise that you have identified on the NAICS codes form of the application package:

NAICS 541330: ENGINEERING SERVICES
NAICS 236220: CONSTRUCTION MANAGEMENT, COMMERCIAL AND INSTITUTIONAL BUILDING NAICS 237110: CONSTRUCTION MANAGEMENT, WATER AND SEWER LINE NAICS 237990: CONSTRUCTION MANAGEMENT, MASS TRANSIT
NAICS 541990: ALL OTHER PROFESSIONAL, SCIENTIFIC, AND TECHNICAL SERVICES

Your DBE certification applies only for the above code(s). You may review your firms information in the CUCP DBE database which can be accessed at the CUCP website at
https://dot.ca.gov/programs/civil-rights/dbe-search. Any additions and revisions must be submitted to Metro for review and approval.

In order to ensure your continuing DBE status, you are required to submit an annual update along with supporting documentation. If no changes are noted, then your DBE status remains current. If there are changes, Metro will review to determine continued DBE eligibility. Please note, your DBE status remains in effect unless Metro notifies you otherwise.

Also, should any changes occur that could affect your certification status prior to receipt of the annual update, such as changes in your firm's name, business/mailing address, ownership, management or control, or failure to meet the applicable business size standards or personal net worth standard, please notify Metro immediately. Failure to submit forms and/or change of information will be deemed a failure to cooperate under Section 26.109 of the Regulations.

Metro reserves the right to withdraw this certification if at any time it is determined that it was knowingly obtained by false, misleading, or incorrect information. Your DBE certification is subject to review at any time. The firm thereby consents to the examination of its books, records and documents by Metro.

Congratulations, and thank you for your interest in the DBE program. Should you have any questions, please contact us at (213) 922-2600. For information on Metro contracting opportunities, please visit our website at www.metro.net.

Sincerely,

Shirley Wong
Principal Certification Officer
Diversity & Economic Opportunity Department
Regular City Council Meeting - May 15, 2025

Page 327 of 583 ends

October 14, 2020 Metro File #6184

Ms. Crystal Faqih
Z&K Consultants, Inc.
22295 Jessamine Way
Corona, CA 92883

Subject:

Small Business Enterprise Certification

Dear Ms. Crystal Faqih:

We are pleased to advise you that after careful review of your application and supporting documentation, the Los Angeles County Metropolitan Transportation Authority (Metro) has determined that your firm meets the eligibility standards to be certified as a Small Business Enterprise (SBE) as required under Metro's SBE Program. Your firm will be listed in Metro's SBE database of certified SBEs under the following specific areas of expertise:

NAICS 541330: ENGINEERING SERVICES
NAICS 236220: CONSTRUCTION MANAGEMENT, COMMERCIAL AND INSTITUTIONAL BUILDING NAICS 237110: CONSTRUCTION MANAGEMENT, WATER AND SEWER LINE NAICS 237990: CONSTRUCTION MANAGEMENT, MASS TRANSIT
NAICS 541990: ALL OTHER PROFESSIONAL, SCIENTIFIC, AND TECHNICAL SERVICES

Your SBE certification is valid for five years from the date of this letter and applies only for the above NAICS code(s). Any additions and revisions must be submitted to Metro for review and approval.

In order to ensure your continuing SBE status, you are required to submit an annual update along with supporting documentation. If no changes are noted, then your SBE status remains current. If there are changes, Metro will review to determine continued SBE eligibility. Please note, your SBE status remains in effect unless Metro notifies you otherwise.

After the five-year certification period, your entire file will be reviewed in order to ascertain continued SBE certification status. You will be notified of the pending SBE status review and any documentation updates necessary prior to the expiration date.

Also, should any changes occur that could affect your certification status prior to receipt of the annual update application, such as changes in your firm's name, business/mailing address, ownership, management or control, or failure to meet the applicable business size standards or personal net worth standard, please notify Metro immediately.

Metro reserves the right to withdraw this certification if at any time it is determined that it was knowingly obtained by false, misleading, or incorrect information. Your SBE certification is subject to review at any time. The firm thereby consents to the examination of its books, records, and documents by Metro.

Congratulations, and thank you for your interest in Metro's SBE Program. Should you have any questions, please contact us at (213) 922-2600.

For information on Metro contracting opportunities, please visit our website at www.metro.net.

Sincerely,

Shirley Wong
Principal Certification Officer
Diversity & Economic Opportunity Department
Regular City Council Meeting - May 15, 2025

Page 328 of 583 ends

hereby grants
to
Z&K Consultants, Inc.
who has successfully met WBENC's standards as a W omen's Business Enterprise (WBE).

This certication arms the business is woman-owned, operated and controlled and is valid through the date herein.

Certication Granted: January 19, 2021
Expiration Date: January 31, 2022
WBENC National Certication Number: WBE2100129
WBENC National WBE Certication was processed and validated by W omen's Business Enterprise Council - W est, a WBENC Regional Partner Organization.

Authorized by Pamela Williamson, President & CEO
W omen's Business Enterprise Council - W est
National  Women's  Business Enterprise Certification
NAICS: 541330, 236220, 237110, 237310, 237990, 541990
UNSPSC: 81101500, 81101510, 81101511, 81101513, 81101527, 81101528, 81102200 Regular City Council Meeting - May 15, 2025

Page 329 of 583 ends

APPENDIX D. EVIDENCE OF

INSURABILITY
Regular City Council Meeting - May 15, 2025

Page 330 of 583 ends

ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD

PRODUCER CONTACT
NAME:

FAXPHONE
(A/C, No):(A/C, No, Ext):

E-MAIL
ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY)

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $
DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $

PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT
OTHER: $

COMBINED SINGLE LIMIT
$(Ea accident)
ANY AUTO BODILY INJURY (Per person) $

OWNED SCHEDULED
BODILY INJURY (Per accident) $AUTOS ONLY AUTOS

HIRED NON-OWNED PROPERTY DAMAGE
$AUTOS ONLY AUTOS ONLY (Per accident)
$

OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $

PER OTH-

STATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
© 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03)

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
5/17/2024
(714) 505-5550 (714) 975-8966
25674
Z & K Consultants, Inc.
22295 Jessamine Way
Corona, CA 92883
31194
A 1,000,000
6802J978123
5/18/2024 5/18/2025
5,000
1,000,000
2,000,000
2,000,000
1,000,000A
BA6W8120541
5/18/2024 5/18/2025
5,000,000A
CUP7W800864 5/18/2024 5/18/2025
0 5,000,000
A
UB-9K77696A-23-47-G 5/18/2024 5/18/2025 1,000,000
1,000,000
1,000,000
B E&O Aggregate $2M 0105963601
7/10/2024 Ded $0 2,000,000
Insured Purposes Only

PROOF OF COVERAGE ONLY
Z&KCONS-01 SOPHIAGONZALEZ
NFP Property & Casualty Services, Inc.
1551 North Tustin Avenue
Suite 500
Santa Ana, CA 92705
Travelers Property Casualty Company of America
Travelers Casualty and Surety Company of America
Aggregate
7/10/2025
X
X
X
X
X
Regular City Council Meeting - May 15, 2025

Page 331 of 583 ends

Regular City Council Meeting - May 15, 2025

Page 332 of 583 ends

120

STAFF REPORT
DATE: M AY 15, 2025
TO: HONORABLE

MAYOR AND CITY COUNCIL
FROM: ROD BUT

LER, CITY MANAGER
BY: PAUL TOOR, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: AGENDA ITEM NO. 12.I

RESOLUT

ION OF THE CITY COUNCIL OF THE CITY OF JURUPA

VALLEY ACCEPTING CERTAIN STREETS INTO TH E CITY
MANTAINED STREET SYSTEM FOR PARCEL MAP 37528 LOCATED

EAST OF RUBIDOUX BOULEVARD, SOUTH OF EL RIVINO ROAD,

WEST OF HALL AVENUE, NORTHWEST OF A PRIVATE PROPERTY

OF THE WEST RIVERSIDE CANAL AND JURUPA CANAL (AGUA

MANSA COMMERCE PHASE III, LLC)

RECOMME
NDATION:

That the Ci
ty Council:

1. Adopt Resolution No. 2025-50:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF JURUPA

VALLEY ACCEPTING CERTAIN STREETS INTO THE CITY MAINTAINED STREET SYSTEM ( PARCEL MAP 37528 LOCATED EAST OF RUBIDOUX

BOULEVARD, SOUTH OF EL RIVINO ROAD, WEST OF HALL AVENUE,

NORTHWEST OF A PRIVATE PROPERTY OF THE WEST RIVERSIDE
CANAL AND JURUPA CANAL ). PURSUANT TO STREETS AND
HIGHWAYS CODE SECTION 1806

2. Authorize the City Engineer to record the Notice of Completion now that public improvements have been completed by the developer and accepted by the City Engineer; and

3. Direct the
City Engineer to release the remaining bonds after 45 days for the Faithful Performance, and the Material and Labor for street improvements.

RETURN TO AGENDA
Regular City Council Meeting - May 15, 2025

Page 333 of 583 ends

BACKGROUND

On April 21, 2022, City Council approved Final Parcel Map No. 37528 (“Final Map”). The Final Map subdivided the existing property into 12 lots for industrial/commercial use and 1 lot for open space (“Open Space”) and remediation purposes located on 302.8 acres.

The streets designated as lettered lots within the Final Map were dedicated by the owner for public use for public utility purposes. Prior to recording the final map, subdivision agreements were executed, and bonds were provided by the developer to secure the required improvements.

ANALYSIS

The developer, Agua Mansa Commerce Phase III, LLC, completed construction of the required improvements for the Final Map as of December 29, 2023. Staff inspected the improvements for compliance with the approved plans, adopted conditions of approval, the City’s Standard Plans and Specifications, and the City’s Municipal Code. All improvements have been constructed and compl eted to the satisfaction of the City Engineer. The streets now being accepted by this action are shown on the attached map.

OTHER INFORMATION

Previous Actions:

• City Council meeting of April 21, 2022: City Council approved Final Parcel Map 37528, subdivision agreements, and accepted offers of dedication and improvements bonds.

FISCAL IMPACT

The City has received development fees and payments as part of the obligations defined in the Municipal Code. The Public Works Department will maintain the public improvements on the streets dedicated to the City and accepted on the Final Map.

ALTERNATIVES

1. Take no action.

2. Provide alternative direction to staff.

************************** SIGNATURES ON FOLLOWING PAGE ************************** Regular City Council Meeting - May 15, 2025

Page 334 of 583 ends

Prepared
�
Yash Patel
Assistant Engineer
Reviewed by:
rL� - n Paragas ,vsa, -
Director of Finance
Approved as to form:

Peter M. Thorson
City Attorney
Attachments:

1. Resolution 2025*50

2. Final Parcel Map 37528

3. Notice of Completion

4. Bonds
www.jurupavalley.org
Reviewed by:
tiJ{� Director of Public Works/City Engineer
Reviewed by:

Michael Flad
Assistant City Manager
�.i-�
Rod B. Butler
City Manager
Page I 3
Regular City Council Meeting - May 15, 2025

Page 335 of 583 ends

RE

CORDING REQUESTED

BY AND WHEN RECORDED
MAIL TO:

City Clerk
City of Jurupa Valley
8930 Limonite Avenue
Jurupa Valley, CA 92509-5183

____________________________________________________________________________________ EXEMPT FROM RECORDING FEE PER GOVT. CODE § 6103

RESOLUTION NO. 2025-50

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF JURUPA

VALLEY ACCEPTING CERTAIN STREETS INTO THE CITY
MAINTAINED STREET SYSTEM (PARCEL MAP 37528 LOCATED ON

THE SOUTHEAST CORNER OF RUBIDOUX BOULEVARD AND EL

RIVINO ROAD) PURSUANT TO STREETS AND HIGHWAYS CODE
SECTION 1806

THE CITY COUNCIL OF THE CITY OF JURUPA VALLEY DOES RESOLVE AS FOLLOWS:

Section 1. The City Council hereby finds, determines and declares that:
(a) Parcel Map 37528 was recorded by the Riverside County Recorder on April 27, 2022 (“Parcel Map”).
(b) Pursuant to Government Code Sections 66477.1 and 66477.2 and other applicable law , the Parcel Map offered for dedication to the City certain land for streets, public utilities and associated drainage and public improvements as described on Exhibit A, attached hereto and incorporated herein by this reference (“Streets”).

Regular City Council Meeting - May 15, 2025

Page 336 of 583 ends

(c
) The City’s acceptance of the dedication of the Streets is conditioned on the completion of construction of the Streets and associated drainage and public improvements in accordance with City Standards and improvement plans approved by the City Engineer as provided in the Subdivision Improvement Agreement for the Streets entered into between the City and the owner of the parcel. (d) The City Engineer has inspected the Streets and has determined that the Streets and the public improvements related thereto have been satisfactorily completed in accordance with Improvement Plan No. IP 21-002, approved by the City Engineer.

Section 2. The City Council hereby accepts the Streets and related drainage and public improvements as described and depicted on Exhibit A into the City -Maintained Street System pursuant to Streets and Highways Code Section 1806.

Section 3. The City Clerk shall cause this Resolution and its exhibits to be recorded in the Official Records of the County of Riverside.

Section 4. The City Clerk shall certify to the adoption of this Resolution.

PASSED, APPROVED AND ADOPTED by the City Council of the City of Jurupa Valley on this 15th day of May 2025.

__________________________
Brian Berkson
Mayor

ATTEST:

__________________________
Evelyne Ssenkoloto
Interim City Clerk
Regular City Council Meeting - May 15, 2025

Page 337 of 583 ends

C

ERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.

CITY OF JURUPA VALLEY )

I, Evelyne Ssenkoloto, Interim City Clerk of the City of Jurupa Valley, do hereby certify that the foregoing Resolution No. 2025-50 was duly adopted and passed at a meeting of the City Council of the City of Jurupa Valley on the 15 th day of May, 20 25 by the
following votes, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF , I have hereunto set my hand and affixed the official seal of the City of Jurupa Valley, California, this 15th day of May, 2025.

________________________________
Evelyne Ssenkoloto, Interim City Clerk
City of Jurupa Valley
Regular City Council Meeting - May 15, 2025

Page 338 of 583 ends

E

XHIBIT A
STREETS AND RELATED PUBLIC IMPROVEMENTS FOR PARCEL MAP 37528:
- RUBIDOUX BOULEVARD
- EL RIVINO ROAD
- HALL AVENUE
- LOTS “A” THROUGH “F”
Regular City Council Meeting - May 15, 2025

Page 339 of 583 ends

;
Fa6I
16 s.d
''
PArcd:i
Ofi,IER'S STAEilENI:

IN IHE CI|Y OF JURUPA VALLEY, COUNIY OF RIWRSIDE ,'
PAF?CEL ANAP No. O752A
BEINO A SUADMSION OF LOTS 8, 9 AilD 11 ATIO PORIENS OF LOIS '.
15 ANO 16, AU LOIS OF IIAP OF RMNO
HEtallts SLoCt( ,, As PER tttP R€CORDEO N @OK 5, PAGE, t,ls OF IIAPE IOGfHER ,vtlH tuRnONS OF RMM) aouLEyARo (uAaiED), ALSO \OaETHER trtH LOrS I HROUoH lE, tNCLUStvq OF RMilO AAROiNS, AS PER &AP R€CORDo tN @Ot( 2t, PA6E 29 OF ttAPS ALSO |OOEqTER tvrH PArcEL ts' OF LOf L|NE Ad)UglUENT NO. 52rA RECORDED kty 29, 2@A A5 N,7RL)UEN| NO. 2OOA-O29|N9 OF OFF'CUL RECOROi PArcELS 1Ai tsi AilO b' OF LOr UNE AAIUS|MEM NO. LU
'7r8,
RECORD@ JUNE 30, 202' AS tNglRultEt'lf NO. 202r-0t01779 0F OFFEAL

RECORDE ANO PARCEL
'3

OF ORAM DEED, RECORDED SPIEUBER
'O
2O2O A' INSIRUMENT NO. M2O-0122513 OF
OMCAL R&ORO, ALL IN IHE OFFICE OF |IIE COUNN RECORDER OF 9IIO COUNN LNNC WIH SECruNS 2 ANO A IOYIIIISHIP 2 SOUN], RANCE 5
'Y6T, 'IN
EERMRDINO IIRIOAN, ACCORDINC D NE OFIEAL PUT HEREOF.

IHI€NES ENaINEERNE, INC, OCTOEER, 2O2O
murqflWffi&ffi*.Zaa-\-- ,WffiMomru WM
SURVEYORS STA|EM€NI:

JE Mn$Y ,AE nAr xE ARE tH€ OW€RS Ofr, 0R tAtE SdtE nCflt nnd d NltRESl N lH€ lAttD lNCLllEo grlHtN lH€ SU@MStOlt AS SHOW dt IHE AilNA(m tAP; nilf tlE ARE NE OMf PERSONS WTIOSE CONSE\I| 15 N€C€sSART IO PASS CLEAR \IftE IO SAID WO ANO IIE CONSEN| IO IHE PREPAPAINN ANO trCORUIION OF NilS SUEDMSION IAP A9 SHOVN VTHN tHE OtSltNCnVf BOROE? LNE
ll Lllc,
TIIIS IAP IYAS PR€PARED 8Y UE OR UND€R NY OIR€CNCN NO IS EASED UPON A NA.D sUtuEl tN coNfa4wilcl |{flH lH€ REoU|RETIENIS 0F ltf SUW{rrStON AAP ACf N0 LoCJI *iltctilE Af lw trqJEgf $ Aan uttt cgtERc€ PRtzEu rlc, (N etw 2024 t tMaf STAE IilI il ilNUIft}IR ARE Of IH€ CIIAR^CIIR AM NIWY TIE fugIItN!; IMICIITD, OR fiLL AE N
'CTORilNCE
NN H€ IER'IS 6 IHE TOIIINENT AORf,EIIEM FOP IIE PARCTT MP, ANd nAr sAD NNUilEt S wtLL ff SUtF'CtENf rO EMA-E nE SURyEf ru 8E ROaCEo, I HEREBY SlAIE TAT IilS PARCEL IAP SUEBTAIIIAU| CONFORNS IO IHE APPROIEO ENIAIIE IAP.Nt RtAt PtuPtRtf DE$AA€O AA.ov B aeilCAlED AS il A.ffilENf mt tug.tc AtPtuSeS LOr, 'A' THROUCH ?i btCLUStvE tHE a€0EA1ON tS FOR PUaLE gnm ANo PUilIC UIILII| PURfuSES
tE HER€B| ROArt LOIS '0' DttuUdl Ti tNCLUSttE N0E4l4) aS TR|YA\E SIffE7s A5 gOW HERE(N FOR PRME IJSE FOR IH€ SOL€ aTNtrII G qNSEI.IIF.' OUN fuCCESSOR5 ASSIONEEs, AND PARCEL Ofr'IERS V'IHN ruS PARCEL MP, +hilzzbr' 'unNIIIIE REAI Pfr*EN'f ESCRBED SA^Y A OEDICAIEO AS il EL,ENEN| IW PUBLE PURP68:

LO\S t' DffiUeH 11 fiCiltSLE fH€ EUAlDlt E fOR PUSLE UlWn tuRNSeS rfrETHER MH ilE Rt6Hf OF NORESS AflO ECRESS FOn AntnattOf VEHICLES WHIN IHE tsRMAE SIREE7S.,
gy "fr,fi,,8iii'liilihl'l'lfif,nftsl't"yil$04'[ trl
riilrrd rhbiri\ co,pany, k sota v$w*' ti{ffi.9?!W^f^fi,!#{tr!rffi,fu-l,t[-7fr{,rily:A

BEEN CONPLIR) IIIIH,
AlrlA,{Aro ud+-.l.rlrti UW a h^p^n,
Dclmu* 11q1134 lirblli{,, dt4Atiy|hhntr9 rrM= -*
r,n:+/t*122'
dtY €NaNEER * rlSthz_
Uill+.l Urull+I OilP,\i+s t4e gqrrru
CllT ENCTNEERS SffiEilENl,_
I, UICMEL O. ilENS, HEREAY STAE IIA| I IAIE EAUNED IHE MIIIIN IAP, ANO I AII SAIISITED TMT SAID MP IS I€CHNICAILY CORRECT,
NAfATDN
t duor. qwg Nt4ut
BY:

PRIH| MNE:

PRwf nll€t
8Y:

A
VrcE fuar6mrf
PflNT MilE!
PHNI NNE vtaE fr.E |oer.rT
BENmCAR!-StAtEUOtt.

JPHORGAN C'ASE EWK,N.A., AS ADNINISTRA|IVE A6EN|, IIS SUCC€SSORS ANO ASS|6NS, UNOER CONSTRUCnON OEED OF tRuST, RECOROED S€prtilRER 29, 2O2' /s NstRUuENf NO, 202r-05A0770 0F OfnCAL RECOROS,
- Ril'
MEt d.fl ru.aCEX
nE: AuWa WW
,* t|fu?Lr.* ^n1yi7!@ffi,r?t#u
R.c.E n7o2 atFr/t./o.(
QIY COUNClL_StAtEile'tr:

IHE CiY OF JURUPA VALLEY, COUNTY Or nERStOt, StAfE OF C^LFOaNA, ey tfs Ctfl COUNCIL IEREBY APFROES IIE PARCEL IAP ANO ACffPTS iE OF/E(S) OF Of,UCANON IIAOE HER€ON FOR PUBLIC STREET ANO PURLIC U|TLI|Y PURfuSES. fHE COUNCIL tEcuREs ltAf IHE ACdEP|ANC€ OF tH€ OFFER(s) t5 fO t/..St tm€ N flE Ctfy Ott SEIAIF OF IH€ PUAUC FOR 91IO PURPOSES guf |IAI SAID SIREE7(S) S,1,/.LL NOT 6€COI'E PAR| OF THE dIY MNIAINED SIR€EI
'fSIEil
WIIL ACTtrED 8f REflLUIION
OF IHIS CWNCIL AOOPIED PURSUN| IO SECIION B06 OF IHE fiNAEIS AM) HIGl]flAf' COD€,
Nf ASHEN| FOP iIREE| AND PBTE UfuJN AMS€i, LOI 11' (RU&OOI'( EUEVAROI LOr E (RUAI@UX A.ALEUARD) LOf t'(EL RMtfr tuAD), LOr'b'(EL AntA nUOj, Lor t' (EL RMNo Rdo), AND Lot f (iur AyENUE),
IH€ E'SEU€N| IOR AJEI.E UIILIII PIJRfuSE T$NHER MIH IH€ RIdT OF NCR€SS AIIO EOR€SS FOR EUERaENCY VEH|CLES fifHtN ?RtvAft 9tpEE7S. (LOrg b. THRO|aH T.

NCLUS.|E) t5 il€R€Ay ACCqPqEo.
^o, l4,l zt ,au: Arr.sr:

CIIY OF JURUPA UALLEf,, SIAIT OF CALI
:ffi:**"ffi|gyrn
rAX COLLECTORS CERnndE:_
I HREAY CERttry nqt ACCORD|ilO rO 7H€ R€COfrOS OF tHS OrnCE, AS OF iilS Utt,lltERE Affi NO UENS AOAll,tSf IHE PtuPRfl SHOW\I ON l|lE *flHtN tAp FOR UNqATD SIAIE COUNIY, MUNICIPAL OR LO14L IAXES OR SPECAL /l.s5655I'A'I5 COUECIED A5 IAXES, EXCEP| IAXES OR SPECAL ,.SSE55/EM5 COLLEilA AS IAXES NOYI A UEN AUT Nor ET pAyAa.E wHtcH Atr Estlur€o to BE r dttbt),Sb9.oO . Thtl Anfrvfiv\ cr\ouil, qy aqqVwln44%ffi*1$difuf .
#WilI ,,O
uno, b?fi\ lv , ,, fu-, sn '1ha.*4ba%b-, oEeun
fN_eOND CERnFICAIE:_
M)IARY ACKIAU|.AEMENI:
stAE 6 ILUNO|S
ca)Nt oF coox
)
)
,t
ilY PRNCIPAL PUC€ OF AUSNESS IS IN:
rHE rotrootNo tNstRUil€Nt Ms Actoto*LrDaEo B€rwE ME ott ?,tl -ll-222O2', 8T UN POUCEK IH€ AUIIIORIZED SIOMIORY OF JPUOfuAiI CMSE AlNK NT ON BEIALF OF SUCH CNPANf,
nNESS.ilr wO:
/* W Na+x-vQt{r.-stte-og.:nr.,rus
,1. , .S/6ry4M4€ - ilY'Coililtssattt NUUaER
-l$Hf-)#pL w @ilutsstoN a@ffs i*te ,.2d2\
f -,Lr- CfuNft.
ano' hlttl b zo 12. en Tuw,irhl)tl, , sspury
SEE SHEET 2 FOR NOTARY ACKNOIYLEOEUENT * SBMruRE OUBSIONS sEcnoMs 2 t J, rowvsHtp 2 soun, RANaE 5 ty{.J-', 5,8.U. AND scH€ouLE t' Regular City Council Meeting - May 15, 2025

Page 340 of 583 ends

Faq
fi
c6
IN \HE CI|Y OF JURUPA VALLEY, COUN|Y OF RIUIRSIDE SIAIE OF CALIFORNIA II1IENES €NENEERINE NC. ocroEER, 2020
NOIAR!_AC KNO \ILE0 euEilr:.
g#82 N19,' PARCAS
sbMruRE OktSStONS:

PURSUANT rO SECnOfi 56136 6 lH€ SUEilngON IAP AC| 0F lH€ SIAE 0F CALIFORNL IHE SEMruRES OF IH€ FOLLOfrNO 4SENENT HOLOERS ru'E A€EN OMNED SINC€ IHEIR IN'ERESIS CANNOT flPEN NIO A FE€;
A NOTARY PUSLIC OR OIH€R OFFIC€R CONPLMNO fu15
c€RnficArf v€Hn€s aNLY tHE loEHlilf oF tHE NdMoan
WO SIaNED I'18 DOCUil(NT fO
'IIIEH
IHE CERNfiOlE IS
ATACHEo ANO NOT IH€ IRUH.ULNESS, ACCURACY, OR
u{tilfl G mf MUUFNI
'I€ARN'
RAIICIfr COIIPANY AM JURUPA IANO ANO YAITR COTPA!ff, NgR SUCCESSONS OR ASSI6NS, IOLD€R OF ilUIAL flOHfs fOR OIEHES CAMLS ON ilPELINES, IruT SIJCH ArcHES SIAU IIIIEN PfulCIIClL TOLLOrI IHE LNE OT HE SURGfM $WilnSON, Of tHE JURUPA R/|EHO. (91tO RICHT 0F JvAfS ARE StrltKEf N MruRE AND l0r A.OrfEO)
stAtE oF ?^|AFo'.xt} )
sE
@u /rv oF<ar, FailcltlD
frN6S IIY IAND
,1-anLftlt
I I SEMfuRE
JaIc Sut4
PR\NI tfriE
A NOTARY PUAUC OR O|HER OfFICER COTIPLEVNG THE
CERflT,CAE tl*lFlES O|ILY nE DAnflfY OF IHE NDlVlOlAl
Mlo SENEO tHE NCUilENf tO mCH 7HE CfrnnCAE lS
A|TACHED, AIIO NOT IHE IRUTHFULNSS, ACCURACY, OA
urltdt oF tuf MliilFNl
c-*zr* Ll--
-Tr_EMiiiE-JAdE qrA
PR|M Milf
ON L?etLt< 2oz, AEFORE NE lAAre suc
(tN€Rt MUt MtARf ru&E)
ON
I CERN.Y UNOER PEMUI OF PEN)URY UNO€N ilE /,r''',s OF IHE SIAE OFLALI?'}UIR N4T HE FORECOINO PAPrcRAPH 6 INUE AND CORRECI,
(94t0 WA|S AR€ N MIURE ANO
IHE
LOS AIfiELES ANO SALT U*€ RAILRUO COilPAilY, A CORfuilTION, HOLD€R OF Ail FtsEutM roR ctHslRuclo\ wNlEMtbE us€ No oP€RAltoll oF A srktuRo dAUOE RilLRAO IPACI( PURNS€, RECORD€D SEEYRTR 25, 1923
RECORO|IG tlo: AOOK SlrA PAOE 57t OF o€EDS, R€CORDS OF RlttRSlOE COUNI| soutHERN alLtroRNA €ASON COtP*tX A CORPOR)qON, llOAfi OF AN AS*ENT FOR PUSLE UnLliES, r.,6RESS AilO E6trSS PURPOSES RECORoED AUOUST 21, '926,
N
s@x 686, PAaE 282 aE@S; AilD RTCORDA JULY ,2 ,92A N aOOK 2?Z PaeE J$ a€ms, nEco4o, 0F RrGRSIaE cdNtr.
sountERl cAuFoRtrA ds cotPANl, A coRPo&ilt(N, Is StJcc€ssoR' AN0/0R A5916N5, HOLO€R OF AN ASEilENT IVR PUSLE UI'UNES, NER{SS AND EOR€SS PURfuSES. R€CORDEO JULY JO, 1929, N fuOX ail, PAOE
'06
D€EOS.

AN ASEilENf FOR PUEUC USE, IOR CON,NIEIW ANO IIAINEMIICE OF PUALE UNUNES, AS OEEfrTE IOR D€OICAIW ON flN^P OIROENS AS PEP IAP NLED N 8@T 2', PA6E 29 OF MPS, R&ORD, OF RI'€RSIDE COUNII,
cALtFORnU AECtf,tC POtlFR COilPAtVy, HOL-dER OF AN 498il€Hr fOR PUEL|C UtLnv

PURPOSES, ECORAED NOEHSER
'6,
191E, N 8@K
'O2Z
PA6€ 2'7 ANO RECOROED
^€aE'HaER '1,
t91d N @OX t^r5, PACE 1J5, BO|H OF dFl@4t RftOROt RECORN Of RT'ERSIOE CONY.

IHE AOA IA^ISA VTNIURE A CAII.ORNU 6ENtNAL PARINERSHP,
'ldOER
OF AN
ASEil€M FOR RIL N'NSfuR|AI'ON PURPAiES, RECORDN MY 14
'990,

INCUENT
lP: 172090 0F O.FEUL REORo, RECORAS OF NTERSIDE COUNlv. ,TI'I gil A€RMRAilO COUNIY IIAftR OISIRICT HOLOER OF AN EISENENT FON $AER PMNES AIIO APPURIEMIICE PURPOSE,, RECOROED I.AY
'A '998oOCUilEM lot ,91578 G OFFICAL R€CORAS, RECORDS OF RttERStd€ CArNil, souDERN CAL|4RM A$ COilpANti A CORtuRAToN, fiS SLECEiSORS ANO/OR

A'SION', IALOER OF AN EASEIIENT FOR PIPELINTS AIIO CONOUIIS, TOEETHER YIN AIOERINd, IIEISURIM, REoUUING CATHODE PROITCIION, COTIUUNICAIITNS ANO OBN PPUR|EMNC|S PUffiSEs RECaRaEO NO\|EUaER JO, t998, tN ooCUil€Nf NX 5t7E20 U|EAL R€COROS.

C&PORIUND COLIPATIT, HOLDER OF AII E'SEilENT MR DPAIMG€ PURPOSE:i, RECOROEO dEcfiiaER
'J,
mt, oocultENr lo. 20r7-0522Jr5 0f otFtcaL R€coRas, REcoRos ofRkaga€ couNtY, RfuASD€ CENEN| CdIPAIIY HOLO€R OF AN EASANTN| MR RAAD ANO UNU|Y PURtu5B, RECORoEO tAY E, 2020 aS NStRUilENf NO. 2020-0t96262 aqCAL RECOROS, RECOROS Or ilvERStD€ COUNtt
il'ERSIDE COUNIY |IOOO CONIROI, ANO IIAftl CANSERUAIION DIilRET HOLDER Of N EISEilENT fuR OPAIMO€ PURfusEg REC*IEO NOVE:IIqER I, 2O2' A5 NSNUKTN| tO. tu2r-061165E OFnCru AECOROS R€@tus OF Rfl/&StDt COUNfr.

WlS oF SEARtttCS:._
IHT 8,5A OF EEIRING9 FOR IHB SUfuEY E IHE a'UIORNA STAE PUN€ CoOROM|E S}S/EU (CCSaJ), Z^NE A NORTH AU€R1CAN
dAruN
'983
(MUJ) ASm LOCAttf ON CONTNUOUSLY OPERA|\NO
R€F€RENCE STAruNS (COR,) TtLFpi AyPp'AttD 'tt6O'AS
SHOW HEREON. AIL qSTAMES SIOW ARE GfuUNO OI9TAIICES
UNLESS O|HERmSE N0lE0, tO OgtilN 6RtO OETANCES, ilULnPLr oRouNo dsr/]yce' 8Y A coil&Mnoil fActw oF 0,9999889961, .ALCUUI\ONS ARE MIE Af ESTABLTSHED POIN| tO , FOUNo MtL TAGdEO hIV, CO SURV€iOR., FLUSII, PR RJ Rl A R5; ACCEPI€O lS IIIE CETII€RLNE INERSECTPN OF RUADOUX ROULTYARO ANO EL HnNo aouLEvARo (couvt LN€), J1Tzbr.a5,2z96s9' No?tH,
tr72J36.J2toso999'frEsr nH A ffitH ruEflcaN wM
Hy pRtNctpAL puc€ oF BustN|ss /s ,il, -5A.ujgaA&!S!a-- ca{fln IOTART ACKM)'il.EOEUENT:
ttlcBE
DUE
stAtE of9r!.Lagt!E_)
)t,auw tr*ttll,,IJito)
oru Apal rrr2rzl aarorele#,
(NStRf Wt Mta4t P&E)
ANO
IH€ IN
ruf
t cffinfl uMffi pEMLtt oF paJURy uvoEn HE uns oF ilE star oFeautro2iltlr HAT HE RR€6IYN6 PAR)GRAPH 19 IRUE lTID CORRECT.
mlN(ss ilY tuND:

L43'+t+ilf couusstoN NUUaR
ilY cotvtsstoN ExPtREs 7.t'2t?L
ily PRI,^CIPAI PUCE OF RUSNESS tS til s\J ltl^ralclD COUNIY, N 8$t9'59'r
2&38.1 5'
N 8923'41' W
rJi9.52'
aruu oF ,9a8 (Mw88) 6FS DERTED ELEVAddN OF 9t8.2O'.

VICINITY MAP
il/
cotwlxcENcE IME -oJ7'{1.99'
Ar ESTAEjSHID PoNrr @
SHEFr_-tUOtx:_
sEE SHE| 3 FOR ilONuilEilt A ESr/AL&il€Nf NOTES
S€E SHEE| 1 IOR EOUTIDARY INOEX
sE s4Efs 5 DtNtEH E FOR pDnpML BOUNtyRy OOAttSSE€ ,H€€T 9 IOR PArcEL NOTX SEf S,/E[7 fu MR PArc€L I ANO LOIS ? d T OE74L5
st€ sHeEr n FoR pARcELs 2, J & 1 ANo Lors b. oEtAlLs
sqi sHtrT tt tuR 4ARCELS 5, 4 9, * t, DOatLs.S€€ SHE€I
'1
IDR PArcEL IO MALS-sE! 5H€Et
'5
FaR qARCELS t2 * tJ OEtilLS.
.tEE 5//675 t6 tHrcUOH
'9
FOR OETAILS Or €Xsnta EAsENEiltS
GPS TIES A &4SIS OF BilRINGS: N.t s.
=
r{ 6859'15'tl 7631t.81'
GPS TtE (67657.5t' CRID)srE I
l{
Regular City Council Meeting - May 15, 2025

Page 341 of 583 ends

oerco
rl
16 oc6
PAfr c'Hf ^'it;X"FrKi'6'UiTsza
trttE A suwMstoN oF Lofs E I ANo ,1 ANO tuFttOUS OF LO7S 3, '5,
AND
'A
AU LO|S 0F ilAp OF Rtt/'NO

HEEIIIS SLOA(
',
AS PER IIAP R€CORDED ItI @IN 6, PAC6 115 OF IIAPS IWEIHER NH fuilDNS OF RMTIO RWLilARO (UACAIA) ALSO nenHER MtH LOf,
'
THROUOH t8, ttrCLUSrvE, OF RMttO CAROENS, AS PER ttAP
RECORD€O IN fuOK 2', PAA€ 29 OF IIIPS, ALSO IOOEIHER TYIIH PArcEL ts' OF LOT UNE ANUSIUEM NO, 52'E, REcoRa@ tAy 29, 20@ A, tNsrRuuEMr No. 20oE-029t6J9 oF otTtcul REcoRDs, pAfrcELs 7i tsi ANo T'tr LOr UNE ANUS|MENT NO. LU
'7rA
RECORoo ,JUNE tO, 202t A' tNStRUUENt NO. 202r-0J!r1779 ff OFFTCAL RE@ROA AND PArcEL
'3
OF ORANT OEEO R€CORDED SEP'EUaR 14 2O2O
^S
INS1RUUEITT NO, 2O2O-U2754| OF
oFncAL RECVROS, ALL tN fHE OqCE OF tHE COUN|Y R&OROER OF SAID COUNty, LnN6 WH SECT7?/NS 2 ANO t, totfiisHtP 2 Eotml nANoE 5 wEsr, sAN offiMaotNo u€Rtouil, ACxoRDtNO ro wE omcAl pur HERE1F.

II1IENES ENEINE€RINa, INC, OCTOAER, 2O2O
UOilUHEM E ESTABLISHMEfi NOIES.
fl rwm z' tm HE a&& 1-s t15Ji tLU* frR R,t Acctpttu B tnE sMH - ,A caatEf, oF sEcnaN 2, ns R,Y, san
fal Fow a'Rotr Hp€ tAffiD ft t92ti w o.g', pER H t Ra AccEp',ED s* rH€ sillwatf c&NtR tr sEcfloN z l2s Rsw. sar. fll nuno t'ffiN ptFE frH luEota.E tAc Nytt dll ptR Rts: Actpoa As - NEBECTXN tr IHE MM ff AM M RdD M lwfrf W trsEcrpil t 123 R5u w As gfrw & Rr. f4 snu.: NffrsEctutt ff sount tilt oF *ctw t AM) cEtttRW€ oF wpR - -@Hr OF tyAY: EslAg.tgl@ Ot,Otowe RE@@ dSrArEE RAn A2,05'rROu 12) ffn R,.
ls1 nwo sptt$ & usHER stNpED 7-s s?so', RN. pgp n M
- coRNEn REWa CUnffNnf Ett6 PFetSStO mnt tH€ W eEnWaW'Cowlf SAfrGYmS *rct: AC€EP@ LS *1116. ON llE tlMltERLl LltE ff$t7rw Z t125, R5U SAn NO ACCTPTED rc tE CENftntf ff EL M mNOWRIE f6+ FouNo sprr t %g$n srwp€o as s?soi nusH, ptq R2: AclcptEl As ,rE - twril$f conNER * sfcltoil 2. ra Rtu sau.
fn sr,n; NeH Ul c*tt* * sicltat 2, ,25;ffiu s:gt: Esta6l.tgtEo or' Hd-M trffi dslAilG 0F 229t' FRdt p) PEn R$, fil roum 2' Nn npE a@o 7s ltiti nugi, pB Rr: Acqptp As tHE - wEnsEEtNN ff C&tEmtE ff AoU Wgl RAaD eO Mtn *drON uMt trs€ctw 2, P5 HU S&1. fel s.tt-: nt cENffr oF sEcncr 2. ta Mil, s&t,; EitaJstao Aloxc tHE - frurcnlf frwwnot E LNE tz-p). HaM Rftotu A ustM€ 0f982.79'fnoil l!) Pm nt, l,ol FouND ML tacx€D 3M @ stwEtoRl ntp;, pER Rt R1 a R* ActEpftu_ ^S
iE $MMINE NEBECru Of RMDOUX ilM.ilRO M A M
MJLEWRO (CO6m UNE),
li7l s.r.u.; xonn /1 c*ttEg * s€rrror! t trg_.Rsu, soy: ata*-tswD or,!frWffiff ffir6 tee.22',frut VAptR ^E; HEt_o t?R nEcotu
F21 xonnwsr c*xn * olfic& 'A' c Rto; EstAa,.tolla sy Hot-otrc RfioRo - atsTAlcE t ,9il.2t' FMtl!)Pfi Rto.

TJ+ Fouto *txE d A$HrP. stAup€o 1s s25o1 FLusH. ptP R2: ActEpED As fltE* CEI'ERLIIE ff A RMN) AW M ACIUS AENifr.

Ii4l FOUND SPttQ * UAS\#R S|NPEo 75 5250i \USH, pd M UNfttcfrffi - c*t{ER R€dna, d.RNNnr NNe P E:tgA ymt HE W BFmWtO
COWfl gJftEIM'S ffi|c8 AC$M S HE CENEruN€ W,ITSfCM OF AMO M1D AilO ru AEM.

Fil can*Lne-r ru Aybue 6rM,.Et#D af trcoRo arfirr G wubt'* tHtuN U Ftuil VJ PEn P6 t R9- Fal n w nr cgiltrrut€ ff Rt1: EstA&-tsHED il Hooila REc,aRD alsrAvcl p€R T4 rc w DE cEiltER.nE tr R,J: Egt/t&JgtED ar Hoar6 R€coRo otstmcl pER -
Pt3
@ twnmr wt * aRcEL D'oF Rni ersrw-Etfo of Rlcofa urA ftn Rtr.

Fil ranw un lA@Eo fiy. @ suRltrtwl RU'H. pER R.* AccEpED s HE* cENtERtNE N|&9ECDON tr RTMOUX lmwrytRo AM dgmm M. 14 snn: wrlirisrcrpn G nE wsr aM E nf trnrua$ ut ff ffifioN t - fri Rlrn 9t Atb lltE CtMEil.ttE tr fiJADdU daeflAnb: €SlM.{il#DKXdNA R&ORO D|S|AME ff J69,95', FnOil UA ALONA H€ CEHETN. OF RUEIOOU E(WM FR R5
@ mw ut A6€0 hv. co smlr-l*i RUsu, pfr Rr Acctpr@ As *tttc ou* rrylGEM UHE ff lr€ aENETNE 6 R ANU eOUEAm ilO Dtstfrt 0.30'Ffuil AC Fil g.ru.: tc n HE canlltfrtwl ff w @ulgAtu: BIMJyED ar trffi - ilatE ilo ustANcE pEn R3 M ffi tileEilf Ar la,
@ colane a *vamu acpL€afiot Esaa.EHEo oy Rt:t*D ilrA ffn RJ Vjl w xu- tAe@ *il. co sRE oR', fLUsH, pER RJ: Accp@ As *M N - IMf IN€ tr IIE CTNEruM WIEffiM ff R)aOOUX SOIJMO AN)
o,srNf a62' tfrou e
ptl num rua. tAffio nv. co stfryErtR', f.uslt, ptR Ru AcxpED As *M N_ IAJIO&I| LTE ff il€ CilTERLNE NTEIlsf?IW OF RUMIJX O(M*M AMdtrNt Lz1'm &.

Fil ao!/v0 !a!L
^OAEO
fiu Ly st]fi,gfiR', nusfl, Fa Rt Aet?rEo as EErc oil
- IMgIf UNE OF HE *MERIJIE N|ERSENN.ff RUdDou bdjLMRO AMotstNl 0.t! Ftoil te 761 retlo ,'M! M rAer 7s 5Jso., od#t a2', pER Rt Mm B M - N DE NfrlNRf Lt€ c DE ffi Rtutrsw L nhii dM m ir. - "- @ ratm ML A6tD Ls stgo', dt tw ff Mu" p€R Rt.
!ry oe$ryq t 0F R9; E ta&.tsHEo dt RtCORo ed-Ew ?4 mRr. p\ mt mm n ttr NoaDtrrrr uNE * 4rinlAllnilra er mrnsecnw t @- Ailo tr@@ astM tr 6tt.E' FpoU IZA ftT Rt.

UONUI'iEN| e BIAOUSHTENI ttOfES:

M
@
@
B
EnAa;sflo er HotM R€cm dshucE 2gaot'ttun @ m ntz.
dtAa.Jsffi x Rfrotu ua ffi Rt2
IOUIfi WE M UEdE.E MSTR, flugl, A$TPED AS @'R SPKE M V$IE?,tAffi L5 2360', P€P Pr: ActeED aS IHE CENERTNE NIERSECIPN ff RLtWOtfrw M nlE Swtffitf thtE G sacrpil t t25 Rsu san gF.N.; ,IAltuN 2 ff Rtt EAAJg4Efr ffitArc RECORO UtA Ftuil @ pER Rt, S.Eil: H ff['dN HLCETERLINE.DF RWNX W: BIruw ilNtEPsEcncN ff LNE W)ND nE U4 - pll ?{hP6# WY6* *EVRo: Eshatsno ffNc tAtntur
s.F.N.; CENM WER|tEC|W Of AUALN 9nIZf ANO frlJNOUX_EtdlflARq E,TBLBHED gr Hotdrc A ff@D atstAilc€ * t9ou' fiat VAM R,. sEN.i #ftRt:.lfiNEn E Psa-,64A-ESAA.B1O tloLattd A RE@frO A,ANCE 0FEo@', Ftu$ Yltarc mE YA - AP€n Pr.

I/E:"ERI.f INE ff UM COilWED PER R',* ESIA&.ISTEO ggNE MA W M20' *tlitEttt ua:illtED Ar RBi frctfs imt W Er F,J.

SF.N.: MIE nM N mE UM 0€Sm&21 M( e6, H& AS ff ffi!ESr,4,$H@ OY RECoffi UtA ttut M g- ?A pER Rt7.
gsrtRll utE.of Rugoolil &MEwfrD pER oocwEvf frtffiwo Aua)sa z t962 45 NSM| NO. 7120d m4 R€C,RO* ElirAA.JgED trtb 10' FMtW ff rudod)X &NIMNAS 94M ON R2O, @ s.nn., wtnsraw or nt @m@
@ s,ttt, qrt qr r, lNE *ntfit staw tJ frD H oF n$; Estae.Nio ER -
RECRO UA PtR Rt FNN WJ
fi s.r.n: *trw il oF Rra; Esta&.EH@ pta RE@Ro un rrn n rmt @ S.F,N.i SlAl(N $ Af Flt: ESIA&ISHaD HOLDfi{ll RECOtu NIM ff Jfi.J'ALM wDflstm.y ptutdtawN or UNE p4ilo gfra Rti grfl.; ruM Of OtMnvO OF Rt1; EST/d,.TSflED Ay frtCof,D UtA rnt @ ren WHE4$ERLY uN€ G tltrD COtiEraO P€R Rt1; BAA.JSHE, Or R€C&O AAAtRoil pgPR RE. s,EN.; E$AA.|S\ED At NEfrSEC4ON C@m@
'{,1kffi,ffi,f,{ffiWtr# ffi Wi,Y* 4 anu,A cMt;
iEN.; CtilEME N|ERSEW ff & h14to N\AD NO Wffi R/1t EslA*Jsr/ED Sy Hlinsec* G A LNE 1o' sowEstEnr FRN ttE rssmtf ai,-amt- iz c Fl wr uw a. nf NRIEEAST /1 E ficnan t fls Rstt @i E;tA&.ritro - *rvE0t u FRoil a.

F4 mwo il tu rilH N tao M alF,; acttEpEo As Ec ff cENttRt-NE t ruwM - BTMfu'RO AS SrcW N Ril.
@ xtatmm Berfi ililalNr Rot cuRG ts - @,
@ t'WffilrlW W-'W* * 5o@'P€R Etz ato RN, Et^tc tAwEM
F4 snnt satwagmtr mm ff pARCtt E 6 Rr2 1tEst?RLt G ptt; - tst&.lsH.o il a tr@RD GALC) atstAt{ct tr ,699.N' pER tfi M Rt2 LONChSMf UNE U RI' FfuI' IHE EN'INJNE * TI RMNO fu1D.

Fd s.r,x., swnwtnr c*ilEz 6 ma E * Rr2 (ffir ff n,t: {sna.w' 8r RtcoRo ha.E E uar2J' rlffiraH Vl ttut trffit Ltf ff hi. m ftt2. ls4 qta;-q.-tt-ut lEltELNE ff woN pActFb RR As sflNtt ofl Rra EstaELEHED* of RtcoRo dtA m Rtz. lrdl v,aiqu_tut ccttwws of uNtot pActFb frfr As srfrfit dt Rr?: eirA&lgttl* aY RECM 0/,lA FRWAPaR Rt?, pil s.t4;,ry9- rry 4r zEN@M q wNN ,l.crF,c m As stow oN Rr?; ErirAa,JsHED - aY R€CORD UtA FrutQetn Rtr,
@ rouno t'RoN HpE rAGxEo 7s 5:,g0', oow 0.2', ptR 8,,
F4 s.tty; ry,ryr !il olEllqra W oF,w NfrtH R^ERstD€ t ,NRIH cM.;' EST/!,LEHED HdANe R€CaRO UrA FnOt V4 pER Rr, p1l qr.x.; quq.e mtr N flE aENERN€ *,w NoRtH Rtvttsto€ & dnJs @M' ESr/ilBHfi N)t"drc trCO@ Uil Frut @ Pffi Rr, li* sr.nt tnat papr N nE anv',ra-M * H€ MRIH RtEFsro€ * Jtmtt-crMt* Lfr NM srAw e 6 Rt, EMH@ *nilN6 f€ffio urA Fru{ UA ER F4 sr.r.: tw mr N nE dNEilM ff re w ffisE, ww* t9 ffi sAM a ff Rtt EtrusMD Ho@N6 RtxoRD ua Fruil VA pth @
@
@
@
E}
B@
ts
B
@
@
@
ts
@
@
R2
RJ
R5
R6
ffi
P9
R'O
Rt2R''
R'5
Rt6
RttR'9
m0
* SW, CUffiNILT ff$Egil eanMnaw COuNtl SLtRytrOR)
@fi gyygasp ff Rt1: Eiltulm*a ft4 dn;;11,;6'6;s ii om-;aA--*'RffiffffirW.t2 ND nil Ftan F4 sr.u.; ttfiLE nM N nE rsm* ffi s{f rmhsfrff wt"#;tr,iE f#ffi* lesl s.Ex; stmtdu rRilM ffld7l_ g. a; tStAA,tW At NtrFSEcnON fftu LNt @ _ @ r.w,wyxwa ffiilf ffi&,'ffi&,i,#,!?{,!ff 0H,",., *
su?vrroP9 Not6:
( ) Ndo{$ uasuRED AND R€@O UrA p& sp ftrEq€rlcE
. Na&ar8s ltOtlW€M FOUNo AS NOttD
o NotarS fff ,. ruN pp€, rA6@ 75 5?5oi FLttSH.
o,R, nfc ,0/26,/20t,
o.R-, Rtc, 5/29/2008o.R Rrc, B/30/m2tGM*Mt
Bou"ilRo) d! 9/D€
$ta.E tutvtg N stoE of,
A}IO N
SHEET..INDEX:

E {#E-Et 2 FR ytatNtlf up ilD Nrs e EAR{I6I,gE &#Ef 1 fw tullilunr tw # yff ,o W tr p* autD Rr oEtALs
sff sftEFr to fa Hrci I ilO LOIS t e r" DETATLS
sE wo I t FoR Htuas z ,l t t tto rcrs D. uirus
#w fi ffiffi ,5 ttr i?rai,;, iE;*,
# Yffi", {WffiT,'ioi di^ffF oo*o o*,^o
cam. pER ,{ril i/o. aeaa:olUlfua_, nrr.JL_Aj-zoj4 an
MtMc€ asEilanl;s gau ft Ktpt Fft€E Ot Auil,Ott8s ND wtpt)clqtE.

Regular City Council Meeting - May 15, 2025

Page 342 of 583 ends

;(F
l-
s,o

6.b
3 400
SCILE: l'-400'
IN fHE CI|Y OF JURIJPA VALLEI, COUN|Y OF RIWRSIOE STAE OF CALIFORNA SI,EE| 1 E 'O
S']FE1!i
PAFTCEL A'AP N(2. 3752A
BENO A gt@MStON OF tOtS 8, I ANO
'1
ANo tuRnoilS OF LO|S d t5, AND t6 lU LO|S OF tAP OF RMNO HEIOHIS ELOCK I, AS PER I*1P RECORIED III fuOK 5, PAAB I$ OF TAPS DEAH& UMl PORIICNS OF RMNO SOULilARO (UAO||ED) ALSO |OOEIHER tvtfH LOIS t fHtuUeH E, INCLUSTW OF RMNO ilROENs" AS PER MP RECORDED tN tuOK 2t, PAaE 29 OF VAPS, ALSO tOaE7tlR tflH PArcEL ts'OF LOr UNE ANUgUAfi NO. 52rA, RECORDEO tAY 29, 2008 AS tNStRUilENT NO. 2NA-O29|639 OF OfnCUL R€COROi PArcELS 1Ai tsi ANO 1C'OF LOf UNE ANUSIIIENT ilO. LU
'2rd,
RECORaED JUilE tC', 202' AS tNgnUilEM NO, 202r-0J01779 0F O|T\CAL RECOfrDS, Al,t0 PARaEL lJ Of Oatttr OEEO R€CORDfr SEPIE|IBER t0, 2020 AS INSIRUilEM tM. 202O-U275,t:t oF OFNCUL RECORDS, ALL IN IHE OFNCE OF IHE COUNIY RECORDR OF 9IIO COUN|Y, LNNO NH S€CIIONS 2 ATIO JDN$HP 2 SOUIH, RAME 5 'YECT
gN AERMRDINO MERIOUN, ACTOROINO IO IHE OFFICAI PUf IHREOE II1IENES ENEINFERINC, INC, OCTOEER, 2O2O
r 200
sHEFr NqO(:_
SEE SHEET 2 FOR WCINIIY IAP ANO E/.SIS OF BEARNES
SE SHE|
'
FOR NilIUUEN| & ESIAaI.ISHil€HI M)IB
sEE S//EE|5 5 IHROUaH A FOR fuUNbART D€IAILS
SEE 9/fE7S 9 FOR PArcEL DEIilS
SE SITIE7
'O

FVR PARCEL
'
AND LO|S T'' T O€TAILS
sEE *lIEf "
FOR PArcEL, 2 '
C 1 ANO LO|S b'DEIAILS
sEE SHtEf
'2
FOe PAtrEtS 6 * 7 ANO LO|S A'& E aEtAtLS.
5E SHE| '3
FOR PArc&.s
', A 9, & "
IETALS.
sEE SHEFI
'1
F& PAill
'O

OOAILS,
SEE SHTE|
'5
FOR PArcELs
'2
T I' IETAAS.
sEE s,/fflS
'6
|HNXJaH 19 IOR 0$AiLS 6 EXETNO A$ilENrS

EOUNOARY ETASLISHUEM INOO( SHEET
(
SEE SHEET 5

EL RIVINO
ETEII
s{t SHEET 6
ROAD
,I
{
-l
.,1
t=
t_
a
H
Iq
J
il
o
6 q
]FCD]R.
\t- ET7--/-
I ffi uE s.2
c_ _a@;TL _STREET _l
---\---- -1-
---------+
-\s-_SEE
\

PARCEO-
"ts" Iur
-{-
ti
)
(.-
i-[-A fTferllLcflf 3l
Nr-B" sE
tl4}l.l5r-T---l-

SHEET A
stEc. 3 srEc. 2
IR5\A/, SJE.ML
PARGEL "4"[-LA fTfA
PATBEEL "ts"LLA f7flA
PARCEL "C"LLA XTNA
T2S, I
I
r---{r \--| 'r
|.

Regular City Council Meeting - May 15, 2025

Page 343 of 583 ends

ecr\
Eo
f;o
cd
a, EFDFEbo
m6F\s
c!E
-4E2
B.
aa

UALLEY, COUNIY OF RIWRSIOE STAE OF CALIFORNIA
PAIICEL ANAP TVO.3752A
E
'9
$EAS
RENC A SUBDtngCN Of LO|S 8, I At'lO t1 ANO tuRnONS OF tOtS J, t5 ANO tA ALL LdtS OF kAp OF RMNO HE|OH|S ELOCk I, AS PER IAP REOROED lN EOOK 5, PAC6 lKt OF LUPi IOGIH& MIH tuRlbt'ls OF Rtwlto SOUilARD (UACAIED), ALSO TOEflHER Nil LOIS
' HruUdl IA NCLUSIVE OF RMNO OAROENi A5 PR MP
RECORDED IN BOOK 21, PAOE 29 OF ilAPi ALSO IOOETHER WH PARCEL E'OF LOT LNE AAfugUEM ITO, 5218, RECORDEO MY 29, 2OO8 AS N9IRUUEI,II NO. 2ON-0291639 OF OFFICUL RECORO', PArcELS Vi ?i AND b' OF LOr UNE AAJUSIUEI'1T NO. llA '7rA
RECORDED ,JUNE JA 2O2' AS lilgfRuilEv NO. 202r-OJ91279 0F OFFTCAL RECORDS AilO PARCEL
'J
OF 6e1M DE@, RECORDED SEptWS& tO m2O AS tNstRUilEM M. 2020-0127s,rJ OF oFncAL RECORDS ALL tN IHE OFFICE OF tHE COUNTy RECORaER OF SltD COUNA LnNO tyfiH SECaONS 2 ANO tronNsHlP 2 soutH, RANoE 5 ttf,st sAN gEnMROtNO M€RtOt4N ACCOROINi tu HE OFFTCAL PUt IHER@F.

THIENES EN6INE€RIN6, INC. OCTOEER, 2O2O
0 100 200 4m SHEEI NOEX:_
SCALE: I '-200'
sff
.sEE
SEE
SEE
sfr
sEf
sAf
srEsfE
s8f
SEF
o

HE TIAE
txE , 8€rilo lo6n
Lr
L'
JL4
Jlr.72'i5)
rJ2,il'
il,il'
o(tsnt6 asEuENt!;
stsgtr'lrohr 3
TTSI RsT/, S.IBNL
I r/ c&.
s€c I EL RIVINO ROAD
I rlr'50' , 26JaiJ' (t !t20'15'r 2ar!,il, i,(x rfi2l' E f,
ROD Ms 0@s
+
q
u)-
a+
PARGEI. "A"LLA NZ1A
i
al
ill
Y
9lxl
NI(r)
|
6t
I
I
i
I
-
FOR',ltION
slEctutoN 3 b
L
E
6 H
'n2s, Rsw' sJEUt
PARGEI. "ts''LILA fl7{A
G
o
@
(tfl6o
kL c
3 --l
a
6 (r 9lt'1J' rrs.&' m)
i t[fi' E
ts!7'
S€E 9H€ET 8
Regular City Council Meeting - May 15, 2025

Page 344 of 583 ends

oo',-U
o
.6
s
c6
IN II]€ CI|Y OF JURUPA VALLEY, COUNIY OF RIWRSIOE STATE OF AAUFORNA PAF?CEL IVAP IVO.

IHIENES €NCIN€ERINO, INC.

SHET INOO(:

RMNO
RMIfr
oF RwTNO

OF LOT LNE
octoEER, 2020
sEE SH€tf 2 tOR ndMff MP AilD dAStS 0F AAil$S
sEt gHEf
'
NR ilONUHTTI|
'
ESIAELISHUEN| N)IES
sE s4tzf I ruR eouMyRf tNDEx
sEE 5,/'EZ7S 5 '
fittuUAH I fOR AODfitOML EIOUNilRT OetdLS
SEa SHTZ?S I FOR PArcEL DOI.JLS
SEE SHM rc FOR PARCEI
'
lflO LO|S E" & T MAILS
SE ilM II FOR PARCELS 2, 3 & 1 AND LOIS b'OEIAIL'
sE€ sflEEr t2 FOR PARCEIS 6 & 7 aNo LO|S 'iA't ?'0€tilLi SE€ SH8ET
'J
FOR PARCELS 5, 6, 9, & "
DOAJLS.

SET SHE| I1 FOR PARCEL
'O
D€IAILS,
SEE SHE| tS FOR PARCELS 12 iL $ DAfiLg
sEE
'H4n7S
t6
'HROU6H '9
tOR OET4LS OF EXtSflNO ilSEilENIS

AS PR MP
H+H
0 r00 200
nmsn,
ns, 9&I. nn.ts. afll9n
EL HVINO xrr2J's'r
2in.6e' (x otrJ'td f,
400 600
2o7.A'
il) 0 rt/{' r
SCILE:1'-200'
ROADt,Jo,rr m)
tral7' (m) (r!2o.ra' n6 r il)
d cOlr{TYOFeAtEt{AEnp
-cfrFiii6F-ffi68--
x rre'r' ru,ta'
(x rm'15' r
-
,!S.A' n0 lltr52'
PAREEL "8"
ll I I'i"r'Tt !
Ll 1-] _l_l
l--[
$
SEE SHEET 7
I
N
@
NN
__l ,na Jlpx
MLts.
3 5/
---
nTna-
[.onr 8
MLIB. 5/
[4]5-[4t6
t45-t6
LO'lr 14I
MLts. 5/
it45-[4]6
t_ I
I
I
I
\
I
ILOr 9
N[.tB. 5/
145-]/"6
q
h
L
E
B
fr
\LL
\t\:,RE
I.
iiE
l-
Lr
H
-l--r
a{
E
e
hI
L
E
fr
\ \---I
@
@
I
N
@
N
g
d
A
)F
ltoT [5
MLB. 5/t45-\6
IPOR.

L-
L
\
F()R.

I-orr 16
MLIE. 5/
\ n4s-146
\
oJrr
uE
Ll-
h5bE
@
@
I
N
@
N/
-VtlE
d
o\
--]----.-- )
(.-
a
s€.

T"
I
6 I
Regular City Council Meeting - May 15, 2025

Page 345 of 583 ends

6(F
|-qo
?6
I(
IN IH€ CIIY OF JURUPA VALLEY, COUNTY OF RIVERSIOE 5
PANCEL TVIAP NO.37524
BEINo A SUBotwStON oF LO75 A I AttO t4 AND NRI\ONS OF LOIS d ,d AttO t8, ALL LOIS oF huP oF RMNC) HEIOH|S ALOCK
',
AS pER NaP RECOROED N AOOK 5, pAC6 115 OF tAt\ Damten nH NRnOttS OF RMNO ^OUtilARD
oAAtm) ALSO |OOETHER MtH LOIS
'
1HROU6H
'A
TNCLUSM OF RMNO MOENS, AS P8 tAP
R&OROED IN NNK 2', PAEE 29 OF IIAI'5 ALSO IOCEfuER MIH PARCEL b. OF LOI UN€ ANIBIYENT NO. C2'A RECC)RDo tAY 29, 2OOtt AS fi,tstRuilEw NO. 20A8-029r6J9 OF OFFTCAL RECORDA PARCELS 2i z" ANO t'OF LOf UNE Aa)UgrilEM NO, LU '7rE
RECORoEO JUNE JO, 202' AS tNSfRUilEM ilO. 202r-Ar912n OF OFFTCAL RECOROS, At'tO PArcEL tJ or 0RANT OEEA RECORDED SEPtEttBER tq 2o2o AS NgnunEM NO. 2O2O-O12251J oF oFncul REcoRDs, Alt tN tHE oFncE oF tHE couMv REG0RaER oF 94tD @UN|Y, LnNO tyfiH SECtDttS 2 ANO A rotw,nP 2 soutH, RAtloE 5 tEs,; 94N BERMRAilO MERI.MN, ACCOR0iNo 'O
IHE OmCAL PUr HfiEOE
nltENES ENCINEERINS tNC. OCTOAER, 2O2O
9&7 7 aFt9g#ES
o 100 2oo 400 600
(r
SEE SHEET 6
IPOIR.

ILcm 16
MLIE. 5/
[4t5-]t4r6
I
h;'8$
3 e{
E
!
*
B
I'3
d
F
!t
Y,
I
E
;
E
SCAE: I '-200'
--l
\ \ \ \ \
@
@
!
N
@
N
tlE
E&
)
(.-.
{
a
$g
t
g
PARCEL "C"[-LA fTfA l.ls'(81)
H
e
-lr
Hll I
gdr
f;lr '
t
h
a
s
s\9'Fe
I
t
J.s.,*
(r
muts 2
-
J-D-gEE-s:i:-
* o.''.', i*.rr-, (* or,,,Iiroi.r-lru(i r2a1!. r 2rtrm, R!) rl
V
-{fl 'Jli*
scRs.2
SHEET,-INDAC- UT Iff
UIC
'
ISBB
II &
S!! SH6ET 2 FOR t/ttMll tAP AM dAS6 Or BA&mOSSE SHEE| J FOR IIONUHENI * STABLEHilENT NOI|-5 sEE SH.IT 1 FOR @UNAARY ttOO(q6E .9HEE7S 5, 6 ANo A FOR ADOnOilaL AANOART OETilLSsEE 5l/EE75 9 IOR PAfrCEI OETA]LS sEE sHEEr to FoR parcEL , AND Lon T. & T- oETAtLs
sEE SHIET I, foR PAtrELS z J T 1 ANo Lors b. DaA]Ls
S_gitHqr t2 FOR pAftA_S 6 * 7 AtD LO\S .A. & Z. OEtilLi.sEE sHEEr tJ FoR prRcEts s, E, 9, e , i imtLs - -- ---' 9E SHEEI t4 FOR P'rcd IO DCALS
lE sHEtf ,5 FOR PATeLS t2 * t3 DOAILS.
s6E s//ffrs ,6 tHRotbH t9 FoR ooAlLs oF EXtStl/,6 6i.9,j,ft7r[S Regular City Council Meeting - May 15, 2025

Page 346 of 583 ends

EG|-g,
o
(6
rto.l
IN IH€ CITY OF JURUPA VALLEY COUNIY OF RIWRSIO€, STArc OF CALIFORNA SIfiET E IF '9 sAEE7s
PAFICEL IVAP NO. 37524
aANo A sUBoMsw oF Lots d' I AttD t4 AM ruRnoNs OF Lols d '5' kto 'A fu Loz5 oF t'uP oF RMM
HEEHIS BLOCK I, AS PEN HAP RECORDED IN BOOK 5, PAEfs
'4'
AF ilAPS IOGE1HER U'IH PORIIONS OF HW,IO
BOUtflARo UAoltED) ALfi DoEtHR mftt LOIS , THROUOH ,A NCLUSr\E, oF RMNO @tRDENg AS PER taP RECOROEO IN BOOK 21, PAOE 29 OF IIAPS, ALSO fOEilHEN NH PARCEL E' OF LOT UNE AAIUSIUETII M. 52IA RECORDED IAY 29, 2M AS INSTRUUEM NO. 2M-O29IN9 OF OFFICAL RECOROS, PAMELS .Ai tsi AND T. OF LOr UNE AAtugUENT tfr. LU '2rA
RECORO@ JUNE 3q 202' AS INS1RUilEM NO. 2021-OJ91779 OF OFFICAL R€COROE AltO PArcEL B OF O&4Nl DEED, RECORoEO SPIE\IEER ,d 2020 AS tNglRUtENr NO. 2O2O-4275'.J OF omdfi- REcoRos, AtL tN nE oFncE oF nrE couNlr RTaRDER oF 94tD cotMY LnNo wnH sffnot8 2 ANo J, TOMVSHIP 2 SOUIH, &4I,IOE 5 "8N
SA^I BERMRDINO HERIOUN, ACCORANO M HE OFFICAL PUT HREOF. {0 600
SCALE:l "-200'
ffiTru
dnE , ETA Ii[tnB l66n
JS--rr.-]i-ln
c7 ls.t
6 gsaT
mdl
6 t22',1e'
fr'il13' !].:!Ii
ffi
12t
t7t-t7
ct2 rJsu' e3&2J nti
s€€ sHEo 5
IHIENES ENOIN€€RINA INC, ocroaER, 2020

SHEET INOEX
sff stGl ,o FoR PArcA
'
ANo tOtS T a r aETAIS
g€€ sHEn ,, mR PARCELS 2 3 & I ANo LOIS b'DEIAiLS
sEE StlEEt
'2
F& 4rcfl, 6 * 2 AtA LOIS :A' t E'
anAtls
SE€ SHE|
'J
FOR PANil$ d E, 9, & I' OETAILS.

SE *IEET
'1

FOR PARCE
'O
O€TAIIS
SEE STEEI 15 F(N PARCELS 12 U I' DEIAILS,
sEE s}irE7s
'6
lHNt$H t9 tuR attAlLS OF Odstltfi
Ft9A,lENtS
i{r--lI ?\aQ I
i#ffiiI *l\\- |
. 5l \f,
lvAiqi
'. DF|AIL\g'.
\$tE [ts \ i
-t-
3q rO
ri\
c
(hat
- FORTION
, sEc[To l 3
{ me n:w, sn-n*.
e
\
a.5
'4
It
(i trglf t
rs.m' ro)
fl tt!!2' ttsr/
I
E
oA
SEE *EEf 2 fiN WNIIY MP AN) Bl'5I9 Of EEARMS
sEE grtEf , FOR llaNtluENr ., EglA&.lsHtlENf IOIES
sI'9€I7 4 tuR iltflUnf NIEX
S6I'9trE,5 5 DMLEH 2 fM AOOI'IilIIL SOUNURY DEIAILS
sET .SA€F75 9 IDR PArcEL IETfiS
\
f,
l{g
a
krg
I
(,
E'r.5 t
E

10.J9'
1r.75' n17)
15rJ2'
r,o20'il2)
PARCEL "C"L[-A XTnAT
I
x 199.t2'
x m00' n!2)
$
x rI'll' f, 2&.t, (X !92{[. f, 26€.00' nl)
-
x
i trta/r rr5../ nr2)
b

67.G'(ir)
t lg2{r7, r fiIr{ (x el's. r il)
(,
a
hkeak.-b5H
t
{
B
0 F
m
s
B
ata
I
-i$rft"^
An"g
\
\ s*'
1_
sf, ffi.s&. 2
7-
B
F
B
B
SEE
AROW
PffCtl! II G
GUM lxID
[EC. m-rG2ot
ooc, ,mm-92756, of,
eisS Rl')
$57
I rtr10'0r' x
(fl 1rr0!f
t
B:!c{'-L@.!)-
x t!a'51'I lst.u'
(fl 92/0' r tos' 8t2)
PARGEL "C"
i 1at0'g'f tn.t2'(i rtr.ro' , 2@m' i12)
itr)
ae
rO
8a
-iF \..
iit
e'R
=g
Iad5t
N.;
E
nvn@
-oElAtL_
sQ[8 i.IS
n-c&.O'H.N'
i..liaA0d H.&' Rl4
f 1110/
I rr7,t!'nt4
UNt TlaI$5{!o'_LGrO_
UNE
'
lE,ftflC tmB
LI r fgt:or'E nst
IJ 3 5+J8'1t'
'
azu
L' x s12 u-lx ar$'m'
I
rt.d
G r ,92!'m' r r2l.G'
6 r 2fq'{' r tfft$m'tl,
tr ..,;J
u0
L|l
tlt
Lrt
Lll
LI'
ttr
ll0.!t
ffi1
a
LI 7
Regular City Council Meeting - May 15, 2025

Page 347 of 583 ends

;F
Eo
16 .soc[
lN ltlE cllv oF JURIJPA VALLEI, couNlv OF RltrtRSlOE SIAIE OF CALTFORNTA s,EEr e t'F 'o
e#z7s
PAF?CEL IVAP No.37528
aaNG A SUOaMS|ON OF LOB A I AilD
'1
At'to tuRnONS OF LO|S J, tA ANO tA N.L LOIS 6 IAP OF RMM) HEGI]IS BLOCK
',
AS PER MP RECORDED IN aOOK 4 PA6E
',E
OF MPS IOEftIER YfiH ruRNOI6 OF RIYIM)
EOULilARD uAAEq, ALSO TOaEIHER UIH LOIS I IHROUOH
'A
|NCLUS\W, OF RMNO AROEN, L' PER ilAP
REC@DEo tN AOOK 2r, PAOE 29 OF NA6, ALSO lWm#R nH PARCEL ?' OF LOr LINE AatUSnrENr rA. 52tA RECORDEo tAr 29, 20@ L' tNSfRUilOt NO. 2@E-029r6J9 OF OFFTCUL RECOROS, PAfrCELS 'Ai tsi ANO b'OF LOr UNE AAtWilEM M). LU
"rA
RECORDED JUNE 30, 2O2' AS lNStRUilENf NO. 2O2|-OJ91779 ff OFF6AL R€CORDA ilo PARaA- t3 OF offilr OEEo, REGoROED SEP|EIBR tO 2020 A9 tNStRuttENr t'lo. 2O20-A275,ut oF OFFICIAI. RECOROS, AIL IN IHE OMCE OF IHE COUNIY RECOROER OF SAID COUNTY, LNNC 'TIIH
S&NONS 2 ANO 3,
IOWSHIP 2 Soaml RAI'IOE 5 WEsr,
'Utl
AERMRDIM) ll€RlDUN, ACCORDTNO ft) IHE OFnCAL PUf |H€REOE DIIENES ENCINE€R|NO, tNC. OCTOBES 2020
SHEE| NOEX:_
SCAIE: t "-300'
SE SHE| 2 IOR NdMff MP A'IO AIs/6 6 EaRING'
5EE SHEEf 3 FOR ilONUiltNf 2 E'tAalJsHiltilf t@tts
SEE SHEEI 1 IOR EOUNA4RY INDEX
SEE SHEE]rs 5 THROI.DH 6 FW AAONTOML OOUNOARY DEIAILS
SEE SHEET lO FON PARCEL
'
ANO LO\S E' E T OETAILS
9EE glEO
'I

IOR PARCELS Z '
& 1 AND LO|S b'OEIAILS
SEE *IEET
'2
FOR PARCEIS 6
'
7 NO LO|S A.
' b. OEIAILS.

SE 5HEE7 I' FOR PArcAs 5, A 9, & 'I

OEIAILS,
5E iHEE|
'1

FOR PARCEL
'O

DOAJLS,
SE SHEE|
'5
fOR PARCEI.S
'2
* B OEfuLS.
sEE SHEEIS
'6 'HROIJ6H
19 FOR OOAILS OF EXIS'IIIc A'EYEilIS

INDO( SHEO
LOT \EL RIWNO LOT'D' I 1 noao LOT'E'
iH
SEE AHEET 1I
LOT
2 FIOA,D
smtEr)LOT
EEIHEET 12
6 l-oT 'B'
:-l
LOT'K'
3 t.oT
_t
I

SEE AHEET IO
LOI'P
LOT'O'
LOT 'o'
1 t_
I
H
E&
fi
LOT'P'
LOT
4 'o'
--e- L€'g- - -
9 LOT'R
LOT'A'
5 1o sEE sHEET rg
I
-l
I
I
I
I
I
I
I
LOT
(
I
I
I
I
I
I
-1-
I
I
I
I
I
T
I
I
I
i
I see r5l
I
I
13 I
I
I
I
I
I
L
I
I
I
I
)
)
t.
/l/l
I
\
)
I
v
-t-
sEE SHEET 14
Regular City Council Meeting - May 15, 2025

Page 348 of 583 ends
← All documents from this meeting