Cities Index.
Agenda packet

Lomita City Council
July 7, 2026

Document
Agenda packet
Meeting
July 7, 2026
Body
Lomita City Council
Pages
23
Original file
60.9 MB
Text extracted from the city's file for reading and search. Open the original on lomitacity.primegov.com. That file is the official record.

geo-logic.com
On-Call Geotechnical Services, Sonoma Country Water Agency, Sonoma County, California Mr. McCormick served as Contract/Project Manager for an on-call geotechnical services contract for Sonoma County Water Agency for 12+ continuous years. Services included geotechnical assessment, regional feasibility studies, design and construction services for major storm drains, pump stations, water mains, trunk sewer lines, creek stabilization projects, numerous landslides and roadway repair projects, including retaining wall design.

Many of these projects were located in areas of highly compressible soil, unstable slopes and/or liquefiable soil conditions and fault crossings.

On-Call Peer Review, Santa Rosa, Sonoma and Mendocino Counties, California Mr. McCormick was an On-Call Peer Review Consultant for Alquist-Priolo Fault Zone studies and geologic/geotechnical studies. Services included review of consultants' exploration plans, field observation of fault trenches, consultation with other consultants and County, and peer review of consultant summary fault and geologic reports for conformance with state guidelines and appropriate building setbacks.

On-Call Geotechnical Engineering Contract, Federal Highway Administration (FHWA) Central Federal Lands (CFL) Highway Division. Various Locations throughout CFL Footprint, California Project Geologist. On-call geotechnical services for the FHWA of the CFL Highway Division. Covering 14 states in the central and western United States, the CFL Division supports the FHWA and other federal entities, such as the National Park Service in the design and construction of new and repaired roadways.

On-Call Geologic and Geotechnical Services, Contra Costa Water District, Contra Costa County, California Mr. McCormick provided geologic and geotechnical consulting and design services to characterize and mitigate several landslides affecting access and distribution facilities of the District. Work included emergency on-call services to provide preliminary risk assessments for continued use of facilities prior to mitigation. Mr.

McCormick was the Lead Geologist for multiple geologist field teams for a 2023 Storm Damage Assessment. The assessment included field evaluation of 277 landslide and erosion sites to provide documentation of landslidetype dimension and mitigation alternatives for submittal to the Federal Emergency Management Agency (FEMA) for reimbursement application.

Syar Quarry Landslides Geologic/Geotechnical Investigation and Mitigation Design, City of Healdsburg, Healdsburg, California
Project Geologist and Manager for investigation and mitigation design of multiple river flood and rapid draw down landslide failures along several hundred feet of levee face. Mitigation included removal of failed materials and placement of rock slope protection (RSP) and geofabric.

Sonoma Creek Stabilization, Sonoma County Water Agency, Glen Ellen, Caliofrnia Lead Geologist for creek bank erosion assessment for the Sonoma County Water Agency. Study included assessment of creek bank erosion which was encroaching on a sewer main. Assessment included development of multiple mitigation designs including rock slope protection (RSP) and banks stabilization using geoweb confinement cells.

Edgewood Avenue Retaining Wall, County of Marin, Mill Valley, California Mr. McCormick managed the geotechnical analysis and structural design for repair of a roadway that has experienced visual signs of settlement due to slope movement. He also oversaw the exploratory soil borings, Tuesday, July 07, 2026 Reg CC MTG, Page *125
William McCormick, PG, CEG

Page 4 ends

geo-logic.com
geotechnical analyses, structural wall design and structural analysis, as well as the Plans, Specifications and Estimates for the retaining wall.

Dillon Beach Road Landslide Stabilization, County of Marin, Dillon Beach, California Mr. McCormick performed a geotechnical analysis of the effects of a landslide on Dillon Beach Road. As Project Manager and Technical Reviewer, Mr. McCormick met with County staff to analyze the slide plan in the roadway, and provided recommendations for retaining wall types/designs to support the roadway.

Professional Affiliations
2023 Recipient of “Honorary Member Status” of Association of Environmental and Engineering Geologist (AEG) Additional Professional Training
OSHA Hazardous Waste Operations and Emergency Response Training (40-Hour), Acme Environmental, 2012 Publications and Presentations
McCormick, W.V., Jeff Richmond, and Keith Dahlen, 2014, Formation and Re-activation of Ancient Translational Rock “Megaslides” in the Echo Cliffs, Grand Canyon Area, Arizona, Engineering Geology for Society and Territory – Vol 2, DOI: 10.1007/978-3-319-09057-3_143, G. Lollino et al. (eds), Springer International Publishing, Switzerland 2015
McCormick, W.V., 2010, Using Light Weight Tire Derived Aggregate (TDA) as a Green Alternative for Reconstruction of a Landslide Road Failure, in Geologically Active – Williams et al. (eds.), 2010 Taylor & Francis Group, London, ISBN 978-0-415-60034-7.

McCormick, W.V. and Short, R., 2008, A New “Green” Method of Slope Stabilization Using Plate Piles, in Proceedings of the 41st Symposium on Engineering Geology and Geotechnical Engineering, April 9-11, 2008, Boise, Idaho, University of Idaho, Thomas Weaver and Sunil Sharma editors.

McCormick, W.V. and Short, R., 2007, Cost Effective Stabilization of Clay Slopes and Slope Failures Using Plate Piles, in Proceedings of 1st North American Landslide Conference, June 3-8, 2007, Vail, Colorado, 2007 The Association of Environmental & Engineering Geologists.

Hecker, S, Kelsey, H, McCormick, W. V. et al., 2006, History and Pre-History of Earthquakes in Wine and Redwood Country, Sonoma and Mendocino Counties, California, in Prentice, C.S., Scothmoor, J.G., Moores, E.M. and Kiland, J.P., eds., 1906 San Francisco Earthquake Centennial Filed Guides: Filed trips associated with the 100th Anniversary Conference, 18-23April 2006, San Francisco, California, Geological Society of America Field Guide 7, p. 339-372
McCormick, W.V. and Short, R., 2006, Cost Effective Stabilization of Clay Slopes and Failures Using Plate Piles, IAEG 2006 Paper Number 629 in Proceedings of the 2006 IAEG Conference, The Geological Society of London.

McCormick, W.V. and Rice, J.D., 2001, Rio Nido Landslide, Sonoma County California: Engineering Geology and Emergency Response, in Ferriz, H. and Anderson, R., eds, Engineering Geology Practice in Northern California: California Department of Conservation, Division of Mines and Geology Bulletin 210; Association of Engineering Geologists Special Publication 12, p.61-67.

Borchardt, G., McCormick, W.V. and J. Baldwin, 2001, Final Technical Report Holocene Slip rate of the Green Valley Fault at Freeborn Creek, Fairfield, California, USGS Award No.98HQGR1039.

McCormick, W.V, Burkland, P.V. and P.J. Raynak, 1992, Subsidiary Faulting East of the Hayward Fault in Southern Alameda County, in Proceedings of the Second Conference on Earthquake Hazards in the Eastern San Francisco Bay Area, California Division of Mines and Geology Special Publication 113.

Tuesday, July 07, 2026 Reg CC MTG, Page *126
Chalerm (Beeson) Liang, PE, GE
Principal Geotechnical Engineer
geo-logic.com
Mr. Liang has more than 45 years of diversified experience in geotechnical engineering. Many of his projects require innovative and effective solutions for difficult soil conditions such as expansive soil, liquefiable soil, soft soil, and Bay Mud. Mr. Liang has conducted and managed numerous geotechnical investigations for a range of clients in and around the northern California Bay Area for a variety of clients and projects, including school districts, architects, public agencies, and private homeowners. Mr. Liang’s dedication to excellence resulted in an “Extra Mile” award for his dedication and outstanding client service for the Route 101/85 North Interchange Project for the Santa Clara County Valley Transportation Authority.

Mr. Liang’s project experience includes:
x Highways x Educational facilities
x Overcrossings x Military facilities
x Bridges x Medical offices
x Airports x High-rise buildings
x Fire stations x Water storage tanks
x Libraries x Tunnels
x Hospitals x Pipelines
x Theme parks x Energy facilities
x Creek channels x Reinforced earth structures
x Commercial and industrial x Distressed buildings
x Residential developments x Light rail transit systems x Water and wastewater x Landslide investigations
San Mateo County Landslides, County of San Mateo, San Mateo County, California
Project Manager and Geotechnical Engineer for a geologic and geotechnical investigation related to landslides on Gazos Creek Road, Alpine Road, and La Honda Road. Work included geologic mapping, subsurface exploration, laboratory testing, engineering analysis, and report preparation.

Geotechnical Engineering for the Santa Clara Unified School District, Santa Clara, California
Project manager and geotechnical engineer for over 25 years on projects at various campuses, including shade and play structures; bleachers; pedestrian bridge; solar electric systems; classrooms, performance arts, administration, and multi-purpose buildings; portables; parking lots; tennis courts; swimming pools, and athletic fields. Prepared geotechnical and geohazards reports for DSA/CGS approval, including site-specific seismic response analysis.

Supervised geotechnical observation and testing during construction under the DSA LEA program.

EDUCATION
M.S., Geotechnical
Engineering, 1980
Utah State University
B.S., Civil & Environmental
Engineering, 1978
Utah State University

PROFESSIONAL

REGISTRATIONS
Professional Engineer,
California, No. C35399
Professional Geotechnical
Engineer
California, No. 2031

PROFESSIONAL AFFILIATIONS
American Society of Civil
Engineers
Tuesday, July 07, 2026 Reg CC MTG, Page *127
Chalerm (Beeson) Liang, PE, GE

Page 2 ends

geo-logic.com
Geotechnical Engineering for the San Jose Unified School District, San Jose, California Project manager and geotechnical engineer for various school projects, including multi-story classrooms, administration buildings, gymnasiums, multi-purpose buildings, portables, and parking lots. Prepared geotechnical reports and geohazards reports for approval by DSA and CGS, and supervised geotechnical observation and testing during construction. Schools included Empire Gardens Elementary, Horace Mann Elementary, River Glen Elementary, Terrell Elementary, Simonds Elementary, Bret Harte Middle, Herbert Hoover Middle, John Muir Middle, Pioneer High, and Broadway High.

San Jose Student Housing, Symphony Development, San Jose, California Project manager and geotechnical engineer for a 7-story student housing project near San Jose State University.

The project includes 5-story of residential units over 2 levels of podium parking. Performed a geotechnical investigation and prepared a geotechnical design report. The site is underlain by compressible clays. Rammed Aggregate Piers were used to improve the subsurface soil to allow use of conventional foundations, resulted in significantly cost saving in the foundation construction cost. Also supervised geotechnical observation and testing during construction of the RAP, earthwork, and foundations.

Lower Silver Creek Reach 3, Psomas, San Jose, California Project manager & geotechnical engineer for improvement of a section of the existing creek channel, which included channel widening, concrete lining, retaining walls, and pedestrian bridges. Work included subsurface exploration, laboratory testing, field and laboratory data interpretation, liquefaction analysis, slope stability analysis, seepage analysis, settlement analysis, foundation analysis and report preparation. Recommendations for design and construction of various structures, including foundation design parameters and lateral soil pressures, were developed and presented in the design report. Slope stability analysis included end of construction, steady state seepage, rapid drawdown and seismic. Geotechnical investigation for improvement of the existing creek channel which included two pedestrian bridges.

Bernal Intermediate School Gymnasium, Oak Grove School District, San Jose, California Principal geotechnical reviewer for a new 10,000 square foot gymnasium on the existing campus. A geotechnical investigation report and a geologic hazards report were prepared per State requirements, including a sitespecific ground motion hazards analysis. Primary issues included expansive soils and potentially liquefiable silt.

Berryessa Unified School District, San Jose, California Project manager and principal geotechnical engineer for construction observation and testing services during various improvements to existing campuses.

Coyote Creek Trail Phase 2 Master Plan, CH2M Hill, San Jose, California Project manager and principal geotechnical engineer for a 4.1-mile pedestrian and bicycle trail between Montague Expressway and Watson Park, which included Class 1 trail, four bridges, MSE walls, retaining walls, and ten under-crossings.

Eastridge Shopping Mall Improvements, San Jose, California Project manager and geotechnical engineer for the $100-million renovation, seismic retrofit, and expansion of the existing shopping mall, including interior remodeling, new buildings, new parking structure, new theatre, and new pavements. Performed a geotechnical investigation with recommendations for earthwork, building foundations, and pavement sections. Supervised construction geotechnical observation and testing.

Tuesday, July 07, 2026 Reg CC MTG, Page *128
Chalerm (Beeson) Liang, PE, GE

Page 3 ends

geo-logic.com
San Jose International Airport, San Jose, California
Project Manager and Geotechnical Engineer for various improvements to the airport, including baggage handling facility and evaluation of taxiway pavements, following FAA guidelines.

Valley Water Seismic Safety Evaluation of Dams, AMEC, Santa Clara County, California Project manager and geotechnical engineer for observation and testing services during construction of access roads to various drilling sites at Calero, Guadalupe and Almaden Dams. Also performed Becker hammer testing at Calero Dam for liquefaction analysis of the underlying granular soils.

Upper Llagas Creek Flood Protection Project, RMC Water & Environment, Santa Clara County, California Project manager and principal geotechnical engineer for final design of a 14-mile-long section of Upper Llagas Creek in south Santa Clara County. Project includes existing channel improvements, new channels, and a tunnel.

The geotechnical scope included field exploration (borings, cone penetration testing, and rock coring), laboratory testing, and engineering analysis. Engineering analysis includes liquefaction evaluation, creek channel and levee stability and seepage, following Corps of Engineer guidelines.

Singleton Road Bridge, CH2M Hill Engineers, Inc., San Jose, California Project manager and geotechnical engineer for a new 3-span, 280-foot long pedestrian bridge over Coyote Creek. Project also includes a Class 1 trail. The geotechnical scope included borings, cone penetration test probes, laboratory testing and engineering analysis. A Foundation Report was prepared following Caltrans guidelines, including an acceleration response spectral (ARS) curve for seismic design.

City of Fremont On-Call Geotechnical Peer Review, Fremont, California Geotechnical Engineer responsible for peer review of geotechnical reports for private developments in the City.

Work with GLA engineering geologist to provide review comments to City staff.

City of Morgan Hill On-Call Geotechnical Peer Review, Morgan Hill, California Geotechnical Engineer responsible for peer review of geotechnical reports for private developments in the City.

Work with GLA engineering geologist to provide review comments to City staff.

City of Fairfield On-Call Geotechnical Peer Review, Fairview, California Geotechnical Engineer responsible for peer review of geotechnical reports for private developments within the City limits. Work with GLA engineering geologist to provide review comments to City staff.

Geotechnical Engineering for the Gilroy Unified School District, Gilroy, California Project manager and geotechnical engineer for various school improvement projects. Prepared geotechnical reports and geohazards reports for approval by DSA and CGS, and supervised geotechnical observation and testing during construction. Projects included a new Antonio Del Buono Elementary School campus, and various improvements at Rod Kelley Elementary School, Eliot Elementary School and Gilroy High School.

Geotechnical Engineering for the Morgan Hill Unified School District, Morgan Hill, California Project manager and geotechnical engineer for various school projects, including classrooms, administration buildings, portables, athletic field, press box, shade structures, and parking lots. Prepared geotechnical reports and geohazards reports for approval by DSA and CGS, and supervised geotechnical observation and testing during construction. Schools included Gwinn Elementary, Martin Murphy Middle, Nordstrom Elementary, Los Paseos Tuesday, July 07, 2026 Reg CC MTG, Page *129
Chalerm (Beeson) Liang, PE, GE

Page 4 ends

geo-logic.com
Elementary, Barrett Elementary, Burnett Elementary, Live Oak High, Jackson Elementary, P.A. Walsh Elementary, and Paradise Elementary.

Geotechnical Engineering for the San Mateo Foster City School District, San Mateo County, California Project manager and geotechnical engineer for miscellaneous school projects, including classrooms, administration buildings, performing art and multi-purpose buildings, retaining walls, athletic fields and paved parking lots. Schools included Baywood ES, George Hall ES, Horrall ES, Laurel ES, Sunnybrae ES, Foster City ES, Meadow Heights ES, Audubon ES, Park ES, Beresford ES, Brewer Island ES, Abbott MS, Borel MS, Bayside MS and Bowditch MS. Performed geotechnical investigations and provided recommendations for earthwork and design of foundations, retaining walls, and pavements. Supervised geotechnical construction observation and testing.

School sites are underlain by variable geologic units ranging from soft Bay Mud to bedrock.

Geotechnical Engineering for the Redwood City School District, Redwood City, California Project manager and geotechnical engineer for various school improvement projects, including new classrooms and portables. Schools included Taft, Clifford, Adelante, Fair Oaks, Garfield, Hawes, Henry Ford, John Gill, Kennedy, North Star, Roosevelt, Roy Cloud, and Selby Lane.

Geotechnical Engineering for the San Carlos School District, San Carlos, California Project manager and geotechnical engineer for various school improvement projects, including new classrooms, administrative buildings, multi-purpose buildings and portables. Schools included Brittan Acres Elementary, Heather Elementary, Arundel Elementary, White Oaks Elementary, Central Middle, and Tierra Linda Middle.

Herman Intermediate School Gymnasium, Oak Grove School District, San Jose, California Principal geotechnical reviewer for a new 10,000 square foot gymnasium on the existing campus. A geotechnical investigation report and a geologic hazards report were prepared per State requirements, including a site-specific ground motion hazards analysis. Primary issues included expansive soils and potentially liquefiable silt.

Everett Alvarez High School Stadium Improvements, Salinas Union High School District, Salinas, California Principal engineer and technical reviewer for improvements at the existing football stadium.

Hartnell College, Salinas, California
Principal geotechnical engineer and reviewer for the multi-story parking garage, learning resource center, and aviation tower. Provided consultation during indicator pile program, production pile installation, and earthwork construction.

California State University, Monterey Bay, California
Project manager and geotechnical engineer for various improvements, including dormitories, theatre, gymnasium, roadways, and parking lots. Also provided geotechnical engineering during the master planning phase.

Tuesday, July 07, 2026 Reg CC MTG, Page *130
Mohsen Mahdavi Kharanaghi, PhD, PE, GE
Principal Engineer
geo-logic.com
Dr. Mahdavi has more than 17 years of of diverse experience in project management, technical expertise, and research across a wide range of complex geotechnical engineering design and construction projects throughout California, Texas, and abroad. He oversees project management, design reviews, field and laboratory investigations, engineering analysis and design, and the preparation of geotechnical studies and reports. He specializes in the analysis geotechnical design of static and seismic slope stability, earthretaining structures including cast-in-place concrete walls, MSE walls, soil nail walls, retaining walls, sound walls, and tieback walls, as well as the design of spread footings, driven piles, and drilled piles. His expertise also includes settlement analysis for foundations and earth fills, liquefaction evaluation, and ground improvement. Dr. Mahdavi has served as a key point of communication between client project/design managers and local project teams. He has been instrumental in numerous Caltrans and local agency projects and on-call contracts.

Fairfax Bolinas Road MP 1.27, 2.12 & 2.19 Slide Repairs Project, Marin County Public Works Department, Fairfax, California
Principal geotechnical engineer; managed engineering services for three landslide projects along Fairfax-Bolinas Road. Responsibilities included conducting geotechnical investigations and laboratory testing, performing engineering analyses, providing geotechnical design recommendations for proposed retaining walls, preparing draft and final geotechnical reports, and collaborating with structural, survey, and environmental engineers, as well as the County project manager, to deliver a complete design package to the County.

Pixie Trail Landslide#2, Marin County Public Works Department, Mill Valley, California
Principal geotechnical engineer. Provided oversight for field observation and construction management services to the County of Marin during the construction of a proposed retaining wall along Pixie Trail. Key responsibilities included collaborating with the contractor and County project manager, monitoring soil and rock conditions exposed during construction, assessing the applicability of geotechnical report recommendations to site conditions, and recommending design or construction adjustments as needed.

On-Call Geotechnical Engineering Services, California Department of Transportation, Northern California
Senior Geotechnical Engineer and Independent Technical Reviewer Conducted engineering analysis, peer review, geotechnical recommendations, and report preparation for various geotechnical aspects of diverse Caltrans project task orders. Dr. Mahdavi prepared preliminary foundation reports for the replacement of the Stockton Channel Viaduct bridges (Bridge Numbers 29- 0176L & 29-0176R) and the widening of Buena Vista UC Bridges (Bridge

EDUCATION
PhD, Geotechnical
Engineering, 2015
Texas A&M University
MS, Geotechnical Engineering,
Iran, 2009
BS, Civil Engineering, Iran,
2007

PROFESSIONAL

REGISTRATIONS
Professional Engineer,
California, No. C89011
Professional Geotechnical
Engineer California, No. 3263

PROFESSIONAL AFFILIATIONS
American Society of Civil
Engineers (ASCE)
Geo-Institute (G-I) Orange
County (OC) Past Treasurer

PUBLICATIONS
FHWA Technical Report:

FHWA/TX-15/0-6784-1
Tuesday, July 07, 2026 Reg CC MTG, Page *131
Mohsen Mahdavi Kharanaghi, PhD, PE, GE

Page 2 ends

geo-logic.com
Numbers 29-0195L & 29-0195R). He provided as-needed geotechnical recommendations and collaborated with the Caltrans Structural team to select the appropriate bridge type. Additionally, he provided peer review and design recommendations for the SR-70 Binney Junction Roadway Rehabilitation and Complete Streets Project in Marysville (03-YUB-070 PM 15.5/16.4).

On-Call Geotechnical Contract, Santa Clara Valley Water District, Various Locations, California Task Order Manager and Senior Geotechnical Engineer provided engineering field investigations and design pertaining to slope stability, construction-related testing, project management, coordination, fieldwork oversight, engineering analysis, and geotechnical recommendations for the design and construction of various pump stations, canals, and facilities. Examples of task orders overseen by Dr. Mahdavi in the capacity of geotechnical engineer and task order manager included geotechnical engineering services for the Ogier Ponds – Coyote Creek Separation Project, Penitencia Water Treatment Plant Project, Rinconada Water Treatment Plant Slope Stability Analyses, Almaden Valley Pipeline Replacement Project – Unit 2 Phase 2, and Treated Water Isolation Valves Project.

On-Call Geotechnical Contract, County of Santa Clara, Various Locations, California Task Order Manager and Senior Geotechnical Engineer provided engineering field investigations and geotechnical recommendations for the design and construction of various projects, including roadway stabilization and landslide mitigation and repair in County of Santa Clara. Dr. Mahdavi responsibilities included project management, coordination, fieldwork oversight, engineering analysis, and report preparation. Examples of task orders overseen by Dr. Mahdavi in the capacity of geotechnical engineer and task order manager included Geotechnical Engineering Services for the Roadway Stabilization Project on Bloomfield Avenue, Aldercroft Heights Road Landslide Mitigation, and Clayton Road Landslide Repair.

California High-Speed Train Construction Package 1 and 4, California High-Speed Rail Authority, San JoseBakersfield, California Dr. Mahdavi’s responsibilities included collaborating with structural engineers to develop horizontal deformation analyses of mechanically stabilized earth (MSE) walls that supported the high-speed trains. This involved using 2-D Finite Difference Modeling (FDM) software, specifically FLAC, to perform the analyses and meet the deflection criteria.

California High-Speed Train Package 2-3 Design-Build, California High-Speed Rail Authority, San JoseBakersfield, California Geotechnical Engineer for high-speed train embankments, bridge structures, box culverts, and retaining walls.

Key features included HST embankments ranging from 5 to 40 feet in height, roadway embankments up to 50 feet in height, 20 HST bridge structures, 32 roadway bridge structures, numerous box culverts, and numerous cast-in-place and Mechanically Stabilized Embankment (MSE) retaining walls. Responsibilities consisted of bridge deep foundation design using driven piles and small to large diameter drilled shafts, box culvert, MSE wall, and cast-in-place retaining wall foundation design, embankment subgrade preparation, settlement and stability analysis, design of HST track bed for stability, bearing capacity, track deflections, and plastic deformation under static and dynamic loading, and design for critical velocity using the Spectral Analysis of Surface Waves (SASW) method.

Tuesday, July 07, 2026 Reg CC MTG, Page *132
Mohsen Mahdavi Kharanaghi, PhD, PE, GE

Page 3 ends

geo-logic.com
Geotechnical Engineering Services for Eight Chevron Solar Projects, Chevron Corporation, Multiple Locations in California
Project Manager and Senior Geotechnical Engineer provided geotechnical engineering services for the proposed solar array foundations at eight Chevron facilities in Martinez, Tracy, Sacramento, San Jose, Huntington Beach, Montebello, San Diego, and Van Nuys, California. Dr. Mahdavi’s responsibilities included overseeing geotechnical investigation, laboratory testing, geotechnical design recommendations, and preparing reports.

I-15 Express Lanes Design-Build, Riverside County Transportation Commission, Western Riverside County, California
The Riverside County Transportation Department proposed the development of continuous carpool/tolled express lanes along the I-15 median in Riverside County. Dr. Mahdavi’s responsibilities included overseeing and leading a team to review existing subsurface data, conducting shallow borings, performing laboratory testing, and providing geotechnical recommendations for the proposed pavement design and construction, and on expected quantities of over-excavation of unsuitable subgrade materials.

City of Oxnard/Union Pacific Railroad Rive Avenue-Fifth Street Grade Separation Project, Oxnard, California The project involves a proposed six-lane, 275-foot-long, 4-span grade separation bridge at Rice Avenue spanning the existing UPRR tracks and Fifth Street (SR 34) and also includes embankment-supported on- and off-ramps, various retaining walls, and modifications to Rice Avenue from Sturgis Road to south of Fifth Street. The scope of work included. Dr. Mahdavi’s responsibilities included overseeing subsurface explorations; geotechnical laboratory testing; and providing design recommendations for bridge foundation settlement, MSE earth retaining structures, settlement evaluation of embankment fill, and recommendations for new pavement structural sections. He collaborated with bridge designers, WKE, Inc., to provide as-needed geotechnical recommendations and prepared the Bridge Foundation Report (FR) and Geotechnical Data Report (GDR).

City of Lake Elsinore, Camino Del Norte Extension Geotechnical Design Recommendations, Lake Elsinore, Riverside County, California
The City of Lake Elsinore’s proposed project is a new roadway extending Camino Del Norte from the intersection of Canyon Estates Drive and Old Franklin Street on the southeast to existing Camino Del Norte on the northwest.

Dr. Mahdavi’s responsibilities included overseeing surface and subsurface investigations including geotechnical boring and seismic refraction surveys to assess rock ripability in cut areas, laboratory testing of selected samples, developing geotechnical recommendations, and report preparation.

Multiple December 2021 Storm Damage Repair Projects, County of Santa Cruz, Santa Cruz, California Principal geotechnical engineer. Managed engineering services for three landslide projects along Highland Way and Soquel San Jose Road located in Santa Cruz County. Responsibilities included conducting geotechnical investigations and laboratory testing, performing engineering analyses, and providing design recommendations for proposed retaining walls. Prepared draft and final geotechnical reports and collaborated with the County project manager and structural designer to determine the most feasible and cost-effective repair methods for each storm-damaged site.

On-Call Geotechnical Engineering Services, California Department of Transportation, Southern California Senior Geotechnical Engineer provided geotechnical recommendations and overseeing numerous geotechnical investigations including permit preparation and acquisition, coordination of drilling, cone penetration tests, and geophysics sub-contractors, submission of dig alert requests, freeway closure coordination with Caltrans Tuesday, July 07, 2026 Reg CC MTG, Page *133
Mohsen Mahdavi Kharanaghi, PhD, PE, GE

Page 4 ends

geo-logic.com
Transportation Management Centers, analytical testing and disposal of investigation-derived waste, production of geotechnical data reports, and completion of Caltrans borehole backfill data sheets and consultant drill logs.

Provided C-57 license support on dozens of Caltrans task orders throughout Southern California, which involved obtaining permits through the local enforcement agency, ensuring compliance through borehole abandonment observation, and coordinating traffic control services.

I-405 Improvements Project Design-Build, Orange County Transportation Authority, Orange County, California Program Management Consultation (PMC) and geotechnical reviewer. The project involves the improvement of 16 miles of the San Diego Freeway (I-405), between State Route 73 (SR-73) in Costa Mesa and Interstate 605 (I605) near the Los Angeles County line by adding at least one general-purpose lane in both northbound and southbound directions. Dr. Mahdavi’s geotechnical review included the replacement, widening, and new construction of over 35 bridge structures, as well as hundreds of retaining walls, sound walls, and sign foundations. Dr. Mahdavi reviewed geotechnical reports and provided comments.

SR-91 Corridor Operations Project Design-Build, Riverside County Transportation Commission, Riverside and Orange Counties, California
The Riverside County Transportation Commission (RCTC), in cooperation with Caltrans District 8 (San Bernardino/Riverside Counties) and District 12 (Orange County), proposed operational and safety improvements by constructing a portion of the Ultimate Project in this area on the WB SR-91 from Green River Road to the intersection of SR-241 to help alleviate traffic congestion. Dr. Mahdavi’s responsibilities included leading a team to review and summarize existing data, drilling and sampling of boring records, performing laboratory testing, and developing geotechnical recommendations by submitting Material Reports (MR), Geotechnical Data Reports (GDR), and Foundation Reports (FR) for the widening of County Line Bridge and Retaining Walls.

Vista Chino Low Water Crossing Bridge Replacement at Whitewater River Project, Riverside County, California Replacement of the existing low water crossing on Vista Chino at the Whitewater River with a newly constructed 14-span bridge. The total project limits would approximately 4,950 feet. The purpose of the proposed project is to improve traffic circulation and emergency access within Palm Springs and Cathedral City during storm events..

Dr. Mahdavi’s responsibilities included leading a team to perform geotechnical investigations, working with bridge designers, CNS, to provide as needed geotechnical recommendation and prepare bridge Foundation Report (FR) and Geotechnical Data Report
Santa Paula Street Bridge Over Santa Paula Creek Harvest at Limoneira Development City of Santa Paula, California
The proposed Santa Paula Street Bridge Cielo Vista bridge will be constructed in the City of Santa Paula, CA. The bridge is planned across Santa Paula Creek and is intended to connect Santa Paula Street to the west of the creek with the proposed Harvest at Limoneira development to the east. The bridge will be located in the jurisdiction of the United States Army Corps of Engineers and Ventura County Watershed Protection District. Dr.

Mahdavi performed reviews of the 65%, 95%, and final submittal on behalf of the County of Ventura, compared to criteria from AASHTO LRFD Bridge Design Specifications, Caltrans structures manual and Seismic Design Criteria, and the United States Army Corps of Engineers.

Tuesday, July 07, 2026 Reg CC MTG, Page *134
Gregory (Greg) A. Shagam, PG, CEG
Project Geologist III
Mr. Shagam is a Certified Engineering Geologist with over 20 years of experience in geological and geotechnical assessment, investigation, and characterization. His experience includes work of numerous sites in and around the Rancho Palos Verdes/Rolling Hills area. During developmental stages in his career, Mr. Shagam worked for Dale Hinkle P.E. Inc. and conducted a wide range of projects for LACSD, City of Rolling Hills, and City of Torrance, many of which required evaluation and identification of the Malaga Mudstone and its varying degrees of weathering. Projects related to the mapping or logging of geological units found at the Palos Verdes Landfill, such as the Malaga Mudstone and Altamira Shale, are listed below.

Mr. Shagam also has experience overseeing groundwater extraction system design and installation. Monitoring and extractions wells were installed, developed and abandoned by Mr. Shagam on various projects utilizing many different types of drilling methods. This includes permitting, site safety, project and construction management, field documentation and reporting.

Project experience related to the installation and development of extraction wells is also listed below.

Landslide Mitigation, Exploration, Dewatering and Winterization Design, Portuguese Bend Landslide Complex, Rancho Palos Verdes, California Field Geologist for the Portuguese Bend Landslide Complex (PBLC), located along the Pacific Coast in the City of Rancho Palos Verdes. The massive landslide encompasses approximately 239 acres and 38 million cubic yards of sliding mass, with lateral dimensions approximately 0.9 miles x 0.8 miles. Ground movement rates vary widely across the site but have been measured recently to be as much as 11 feet per year near the landslide’s toe at the coast. Field activities include overseeing drilling and construction of boreholes.

Geotechnical Assessment and Retention System Installation, Carolwood/Singingwood Landslide, Torrance, California
Mr. Shagam provided geological field support for the evaluation and repair of the Carolwood/Singingwood Landslide directly adjacent to the northeast property line of the PVLF. Mr. Shagam performed oversight and geological logging of exploratory bore holes and sampling for repair design analysis.

Subsequent caisson and tie-back installations were directed and confirmatory logged by Mr. Shagam.

Geotechnical Assessment and Construction Oversight, Malaga Bank – 25700 Crenshaw Blvd, Torrance, California
Mr. Shagam participated in the initial investigation for proposed construction of the Malaga Bank located at the corner of Crenshaw and Rolling Hills Road.

This involved Drilling and sampling of undocumented fills and alluvium overlying the Malaga Mudstone member of the Monterey formation. Mr.

Shagam also provided construction oversight with regard to geotechnical

EDUCATION
BS, Geological Sciences
Minor, Business Administration
California State University,
Fullerton

PROFESSIONAL TRAINING
Certified Engineering Geologist,
CA (CEG# 2700)
Registered Professional
Geologist, CA (PG# 9406)
Remote Pilot License (3914144)
Private Pilot’s License (noncurrent)
OSHA 40-Hour HAZWOPER
Training (150422182152)
Radiation Safety Officer (RSO)
Instructor- USCS Class, South
Coast Geological Society (2017)

PROFESSIONAL AFFILIATIONS
President of South Coast
Geological Society – 2018
Geological Society of America
Association of Engineering
Geologists
Tuesday, July 07, 2026 Reg CC MTG, Page *135
Gregory (Greg) A. Shagam, PG, CEG

Page 2 ends

geo-logic.com
quality control throughout the duration of the construction which included a deep over-excavation to bedrock.

Limits and depth of the excavation were determined in the field by Mr. Shagam.

Geotechnical Investigation, 2221 Palos Verdes Drive North, Lomita, California Mr. Shagam directed field activities which included logging bore holes to refusal, sampling and test pit siting and logging. Geologic materials encountered include documented fills, alluvium and the Malaga Mudstone member of the Monterey formation. The purpose of this investigation was to prepare building distress repair plans.

Geotechnical Investigation and Design of Buttress Fill Stabilization, 5 Sagebrush Lane, Rolling Hills, California Mr. Shagam participated in the geotechnical investigation conducted for landslide remediation at the residence.

Landslide material overlying the Altamira Shale member of the Monterey formation was discovered in exploratory bore holes logged by Mr. Shagam and others. When bucket augers were used, down-hole logging was conducted by Mr. Shagam. During construction of the buttress, Mr. Shagam provided oversight of over-excavation activities exposing bedrock prior to placing engineered fill.

Geotechnical investigation of the Via Ballena Landslide, San Clemente, California (Arriola vs. LHC Investments) Mr. Shagam was a Project Manager for this project. He also performed geological mapping and data interpretation, coordinated field work activities, including installation of geotechnical instrumentation, monitored slope inclinometers and tilt meters, developed a site-specific, real-time topography from drone survey data, logged multiple bore holes, hand-dug test pits, and monitored/logged 30-feet deep cuts. He also assisted with slope stability evaluation by means of site characterization that included monitoring and interpretation on groundwater elevations. Mr. Shagam further assisted with the permitting process, including with response to City reviewers. His work also included interaction with the Coastal Commission regarding blue line stream preservation, riparian habitat preservation, and net coastal discharge compliance.

Geotechnical and Seismic Exploration, Century High-Rise Project, Los Angeles, California Mr. Shagam was involved in site exploration program performed in support of siting of a 40+ story building in Los Angeles. The site was in the immediate vicinity of the Beverly Hills fault. He was involved in fault investigations by means of trenching and surface offset observation. Mr. Shagam further provided geotechnical oversight at multiple drilling locations and coordinated fieldwork. Work included drilling, logging, recovery of representative soil samples for geotechnical laboratory testing, and surface restoration. Mr. Shagam also assisted with assessment and verification of locations of existing and abandoned oil wells, postulated to exist in the vicinity of the site. Work included coordination and interpretation of geophysical (surface refraction and magnetic) surveys.

Subsidence Investigation, Litigation Support, Faulk v Standard Pacific, 7 Olive, Ladera Ranch, California Mr. Shagam performed geologic mapping, and geotechnical site/structure assessment of the Faulks residence in support of the Faulks v. Standard Pacific litigation. Work included measurement and assessment of structural deformation, assessment of the cause of the reported and observed deformation. Mr. Shagam performed floor level surveys and performed interpretation of the results. He further characterized in situ soil conditions by means of exploratory boring, identified a potential for shrinkage of highly plastic cohesive soils prone to dehydration, and delineated engineered fills constructed of these materials. Mr. Shagam supervised installation of a slope inclinometer, monitored slope displacements by means of inclinometer readings, monitored structural deflection, and assisted structural engineers who developed recommendations for structural repair. Mr. Shagam further supervised implementation of structural mitigation measures that included levelling of structure to mitigate 9 inches of differential settlement by injection grouting and subsequent repair of post-tension slab. Mr. Shagam also supervised the repair of flatwork and planters.

Tuesday, July 07, 2026 Reg CC MTG, Page *136
Fouad Mina, PE, QISP
Principal Engineer
geo-logic.com
Mr. Mina is a Principal Engineer with 35 years of experience in civil engineering design, master planning and construction phasing of landfill facilities, permitting, landfill operations and maintenance, regulatory compliance, and public works projects, including preparation of bid documents, competitive bidding process, contract development and administration, and construction management. His experience covers a broad range of civil/infrastructure projects, including landfill expansions (vertical and horizontal); landfill closure, post-closure care and land use, and financial assurance; waste recycling facilities; liquid waste ponds’ construction and closure; fee-booth and truck scales facilities; field office; dry and wet utilities; access roads; surface drainage; education center facility to promote public awareness about proper handling and disposal of waste resources; fleet maintenance facility; household hazardous waste collection facility; and land acquisitions and easements.

Prior to joining Geo-Logic Associates (GLA) in December 2019, Mr. Mina worked for the County of Riverside Department of Waste Resources for more than 28 years. His responsibilities have included oversight and management of the Lamb Canyon regional landfill site, as well as several other active and closed landfill sites throughout Riverside County.

Sunshine Canyon Landfill Front Entrance Toe Berm Phase 1 & 2, Engineering Design and Construction Support Services, Republic Services, Inc., Sylmar, California
Project Manager who led a team of civil and geotechnical engineers and geologists in evaluating, designing, and permitting of the ultimate entrance configuration at the Sunshine Canyon Landfill (SCL). The primary objective of this project was to maximize the potential disposal capacity at the SCL through designing the ultimate grading, drainage, and access plans for this site. The core component in this project is an approximately 200-feet high compacted earthen stabilization berm, which is intended to create substansial airspace volume for future waste disposal. This engineered earthen berm will supprt the ultimate landfill build out, provide landfill access road and surface drainage system comprising of a network of channels, downdrains, drainage benches, pipe and box culverts, and water quality basins. This project included preparation of permit-level drawings and interaction with various regulatory agencies to obtain the necessary permits. Project cosnstruction is divided into five phases to be implemented during the period from year 2021 through 2024. Mr. Mina’s efforts in this project also included preparation of the necessary documents for construction of Phases 1 and 2, including Construction Drawings (final grading, drainage, access plans), Contract Documents (Special and Technical Specifications, and Construction Quality Assurance (CQA) Plan), and providing engineering support during prject construction.

EDUCATION
MS, Civil Engineering,
California Polytechnic State
University, Pomona, 2002
BS, Civil Engineering, Ain
Shams University, Cairo, 1985

PROFESSIONAL

REGISTRATIONS
Registered Civil Engineer,
California, No. C52592
Certified Qualified Industrial
Storm Water Practitioner
(QISP)

TRAINING
OSHA 40-Hour HAZWOPER
training
OSHA 8-Hour Annual
HAZWOPER refresher training
SWANA, Manager of Landfill
Operations
Tuesday, July 07, 2026 Reg CC MTG, Page *137
Fouad Mina, PE, QISP

Page 2 ends

geo-logic.com
Prima Deshecha Landfill Bridging Document (feasibility study and preliminary engineering design) for Condensate Treatment & Sewer Conveyance System, Orange County Waste & Recycling, San Juan Capistrano, California
Project Manager who performed comprehensive studies to determine the feasibility of constructing a sewer conveyance system at Prima landfill for disposal of landfill gas condensate into the municipal sewer system within the area. Preparation of Bridging Document included the following:
x Identification of the sewer service authorities within the area and major compliance issues and concerns; x Identification of all required permitting and constraints including pre-treatment options; x Determination of the applicable requirements and design guidelines by the local sewer agencies; x Development of conceptual design alignment, profile, pipe size, and manhole location for the proposed sewer system; and
x Preparation of a final comprehensive Bridging Document to summarize this work including the findings and recommendations.

Lee Vining Landfill Site Remediation Design, Construction Management, and Construction Quality Assurance Services, CalRecycle, Lee Vining, California
Engineer of Record and design engineer responsible for remediation design for this inactive site to eliminate or minimize the immediate and long-term risk due to exposed waste to the nearby residents. Design included grading plans for waste excavation areas, waste reconsolidation area, borrow area, and final cover; preparation of a hydrology study and hydraulic design for drainage improvements. Work also included preparation of design and construction documents, which consisted of design calculations, design report, construction drawings, technical specifications, and CQA plan. Construction Management and CQA services included coordination and documention of construction activities, scheduling of CQA monitors, reviewing contractor submittals, requests for information (RFIs), daily logs from field technicians and CQA monitors, and preparation of any necessary design modifications.

Frank R. Bowerman Landfill Feasibility Study, Engineering Design, and Contract Documents for Liquid Treatment & Sewer Conveyance System, Orange County Waste & Recycling, Irvine, California Project Manager who performed comprehensive studies to determine the feasibility of constructing a sewer conveyance system at FRB landfill for disposal of landfill-generated liquids into the municipal sewer system within the area. This feasibility study included the following:
x Identification of the sewer service authorities within the area and major compliance issues and concerns; x Identification of all required permitting and constraints including pre-treatment options; x Determination of the applicable requirements and design guidelines by the local sewer agencies; x Evaluation of six different alignment options with corresponding point-of-connection (POC) and development of construction cost estimates for all options; x Verification of hydraulic capacity of the existing sewer facilities at each potential POC; x Development of conceptual design alignment, profile, pipe sizes, and manhole locations for the proposed sewer system; and
x Preparation of a final comprehensive report to summarize this feasibility study including the findings and recommendations.

Mr. Mina’s work was commended for being comprehensive and of high technical quality, and as a result, the owner (OCWR) has tasked Mr. Mina to prepare the Contract Documents (project drawings and specifications) for construction of a Treatment System for landfill-generated liquids (condensate, leachate, and groundwater), Tuesday, July 07, 2026 Reg CC MTG, Page *138
Fouad Mina, PE, QISP

Page 3 ends

geo-logic.com
as well as a Sewer System comprising of a lift station, forcemain, and gravity sewer to convey the treated liquids into the nearest municipal sewer point of connection.

Non-Water Corrective Action Plan and Financial Assurance Cost Estimates for Multiple Landfill Sites, San Bernardino County Solid Waste Management Division, California Project Manager who updated the non-water corrective action plan for four closed Class-III landfill sites located in San Bernardino County: Big Bear, Lenwood Hinkley, Twentynine Palms, and Trona-Argus Sanitary Landfills.

These facilities were designed to withstand the maximum probable earthquake and the 100-year, 24-hour storm event. Therefore, further analyses were performed to determine the potential damage scenarios for the maximum credible earthquake, 1,000-year, 24-hour storm event, fire, and flood causal events. Completed corresponding cost estimates per California Code of Regulations Title 27 requirements. Prepared comprehensive reports, subsequently reviewed and accepted by San Bernardino County Solid Waste Management Division with no comments.

Lamb Canyon Sanitary Landfill Engineering, Riverside County Department of Waste Resources, Beaumont, California
Site Engineer and Principal-in-Charge for all engineering aspects of site development projects, including: master planning, engineering design, permitting, preparation of Contract Documents, competitive bidding process, and contract administration of all site improvements and infrastructure projects, such as liner expansions, waste recycling facility, liquid pond closure, fee-booth, truck scales, field office, utilities, access roads, surface drainage, education center facility, fleet maintenance facility, Household hazardous waste collection facility, and several land acquisitions and easements. Spearheaded and directed the preparation of all engineering designs, technical specifications, administrative and general provisions, and all Contract Documents for these Public Works projects. Directed and managed all aspects of the competitive bidding process through contract award.

Lamb Canyon Sanitary Landfill Permitting and Regulatory Compliance, Riverside County Department of Waste Resources, Beaumont, California
Project Manager responsible for preparing all the necessary permitting documents and for obtaining site operating permits and Waste Discharge Orders (WDRs) from the California Department of Resources Recycling and Recovery, Local Health Department Enforcement Agency, and the California Regional Water Quality Control Board. Responsibilities also included managing engineering and landfill operation staff to ensure adherence and compliance with all regulatory permitting conditions and requirements.

Double Butte Sanitary Landfill Closure Design and Construction Management, Riverside County Department of Waste Resources, Winchester, California
Site Engineer and Principal-in-Charge responsible for the design and construction of all aspects of the landfill closure project at the Double Butte Sanitary Landfill. The main tasks included the design of a prescriptive cover system per CCR Title 27 requirements including grading and drainage plans, engineer’s cost estimate, hydrology analyses, stability analyses, project scheduling, Quality Assurance/Quality Control (QA/QC) plan, and geotechnical investigations within the designated borrow source for the final cover material. Prepared the technical specifications and other contract documents for this landfill closure project, and managed all aspects of the competitive bidding process through contract award. Responsible for contract administration of all construction activities, as well as management of construction QA/QC consultant agreement and related activities. Tracked work progress, conducted weekly progress meetings and related documentations, estimated Tuesday, July 07, 2026 Reg CC MTG, Page *139
Fouad Mina, PE, QISP

Page 4 ends

geo-logic.com
quantities, initiated progress payments, prepared construction change orders, and prepared all necessary documents for final acceptance and project close-out.

Highgrove Sanitary Landfill Closure Design and Construction Management, Riverside County Department of Waste Resources, Highgrove, California
Project Manager responsible for design and construction of all aspects of the landfill closure project at Highgrove Sanitary Landfill, including a 4-ft thick monolithic evapotranspiration (ET) cover system, grading plan, surface drainage and erosion control plan, two sedimentation basins, and slope stability analyses.

West Riverside Sanitary Landfill Closure Design and Construction Management, Riverside County Department of Waste Resources, Jurupa Valley, California
Project Manager who designed and managed all aspects of the landfill closure construction project at the West Riverside sanitary landfill facility. Responsibilities included the design of grading and drainage plans for a prescriptive final cover system, preparing engineer’s cost estimate, hydrology analyses, stability analyses, project scheduling, QA/QC plan, and geotechnical investigations within the designates sources for the final cover materials.

Mead Valley Sanitary Landfill Geosynthetic Cap System, Riverside County Department of Waste Resources, Riverside, California
Project Manager who designed an interim geosynthetic capping system for lead-contaminated soil.

Responsibilities included design and construction management of landfill liner expansion, landfill final cover, and gas collection systems. Designed plans, profiles, cross sections, and grading plans. Designed and sized drainage structures, performed topographic field surveys, and placed construction stakes for earthwork, access road, and drainage structure alignments. Performed as-built surveys for landfill liner area and generated record maps.

OTHER WORK EXPERIENCE AND PROJECTS
x Prepared cost estimates for closure/post-closure plans and financial assurance records for several landfill sites in Riverside County. This work also included determining the escrow balances and the minimum annual deposits, or pledges, required for closures, post-closure, and corrective actions. x Prepared the engineering design and contract documents, and managed construction of a Re-use Store facility and development of a new site for a full-scale greenwaste composing operation at Lamb Canyon Landfill.
x Prepared and managed the implementation of SWPPPs for several active landfill sites including Lamb Canyon, Blythe, Desert Center, Mecca-II, and Oasis landfills. x Managed a Design-Build contract, including ground lease agreement, with a private developer (Stronghold Engineering) to install and operate a Solar Energy Farm at the 80-acre closed West Riverside Sanitary landfill.

Provided technical review of the development plans for the Solar Energy project. x Managed several ground lease agreements to install communication tower for cellular wireless service providers, including T-Mobile, Verizon, Sprint, and AT&T, at Lamb Canyon Landfill.

Awards
The 2007 Project of the Year Award was awarded by the American Public Works Association (APWA), Southern California Chapter, Inland Empire Branch, for a liner expansion project that was completed that year at the Lamb Canyon Landfill for which Mr. Mina was the Project Manager.

Tuesday, July 07, 2026 Reg CC MTG, Page *140
Grant Deem, GIT
Project Geologist
geo-logic.com
As a Project Geologist, Mr. Deem's primary duties include: geotechnical borehole logging, compaction testing, field construction-observation and inspection including foundations and pier installation monitoring. His CQA experience includes nearly 7 million square feet of geomembrane and 3 million cubic yards of soil. Mr. Deem has extensive field experience overseeing the installation on groundwater wells and has overseen the installation of more than 40 wells.In addition, Mr. Deem has been an integral team member of Geo-Logic Associates’ (GLA) wildfire debris removal project team.

Landslide Mitigation Design, City of Rancho Palos Verdes, California GLA is currently directing and overseeing a pilot geotechnical investigation and instrumentation program for the City of Rancho Palos Verdes. The pilot program consists of advancement of 20 boreholes by sonic drilling conversion of select boreholes into standpipe piezometers. Mr. Deem is the onsite field geologist responsible for overseeing drilling and construction of boreholes.

Goetting Landslide Investigation, Private Homeowner, Santa Clara County, California
Staff geologist; assisted project geologist with large diameter downhole logging and mapping potential slide areas for proposed subdivision in the Saratoga Hills.

Avenida Montalvo Canyon & Trail, City of San Clemente, San Clemente, California
Construction observation services for a canyon sidewall that has been eroded by stormwater flow through the canyon, undermining the near-vertical slope.

The City of San Clemente constructed gabion wall against the eroded sidewall as an erosion mitigation measure.

Water West Operations, Jurupa Valley, California
Observation, logging, and construction of six groundwater monitoring wells within alluvium, decomposed / weathered bedrock, and unweathered bedrock. Observed, logged, and collected core samples.

Castle Mine Groundwater Monitoring Well Installation, Castle Mountain Venture, San Bernardino County, California
Exploratory drilling and ground water monitoring well installation for the mine’s heap leach pad.

Goldstrike Mine North Block Tailings Facility (NBTDF), Nevada Gold Mines, Eureka County, Nevada
Provided geotechnical support and advanced laboratory testing for the North Block Tailings Facility (NBTDF).

EDUCATION
Bachelor of Science, Geology,
2012
San Jose State University, San
Jose, California

CERTIFICATIONS
Geologist-in-Training

PROFFESIONAL TRAINING
OSHA HAZWOPER 40-Hour
Certification
MSHA P46/48 24-Hour
Certification
SMARA Inspection
Certification
CPN - Nuclear Gauge Certified
Instro Tek Inc. - Radiation
Safety Officer
Cal Trans Certified CTM
216,231,226
Nielsen Environmental –
Complete Ground Water
Sampling, 2012, Certified by
the Geosynthetic Research
Institute
Tuesday, July 07, 2026 Reg CC MTG, Page *141
Grant Deem, GIT
Project Geologist
geo-logic.com
Stringfellow Hazardous Waste Site Hydrogeologic Investigation, California Department of Toxic Substances Control (DTSC), Riverside County, California
Field geologist responsible for overseeing drilling and construction of groundwater monitoring wells as part of the ongoing remediation of this Superfund site. Worked closely with DTSC personnel to ensure that well designs met with project goal. Logged cuttings, and cores, and revised well designs based on field data. Also assisting with groundwater sampling.

Stringfellow Hazardous Waste Site Well Installation Geologic Support, Veolia Inland Branch Fires Wildfire Debris Cleanup Project, Tidal Basin Government Consulting, LLC, Northern California Environmental Task Force Leader for the Inland Branch Wildfire Debris Cleanup in the counties of Lake, Mendocino, Napa, Solano, Sonoma, and Yolo. Managed debris removal crews, reviewed debris removal documentation, worked closely with stakeholders including the California Department of Resources, Recycling and Recovery (CalRecycle) and the California Office of Emergency Services (OES). Assessed site access conditions and work schedule to ensure a smooth, logical, and cost-effective progression of work. Worked with the local agencies to resolve issues between residents, the County, and work crews. Interacted daily with affected residents, negotiating cleanup work schedules and coordinating property recovery efforts.

Upper Llagas Creek Flood Control Project, RMC Water & Environment, Santa Clara County, California Conducted long term ground water level monitoring. Assisted Project Geologist in borehole logging. Developed and implemented traffic control plan.

Hollister Wastewater Treatment Plant, Harris & Associates, Hollister, California Observation and inspection of vibro-placement stone columns for foundations. Project elements included stone columns, Hilfiker retaining wall, 27-foot-deep structure excavation, various structures, pipelines, pump stations and percolation pond levees.

Porter Lane, Ponderosa Homes, San Jose, California
Staff Technician assisting Project Geologist for a fault investigation that successfully cleared a previously suspected active splay of the Calaveras fault at a complex stepover setting. Conducted earthwork observation and testing of engineered fill on and behind MSE retaining walls, home pads, and buried utilities for 19-home hillside subdivision.

Grant Ranch Seismic Retrofit, Santa Clara Parks, Santa Clara County, California Staff Technician assisting Project Geologist for a fault investigation that successfully located and defined a previously suspected active splay of the Calaveras fault at a complex stepover setting; developed tectonic model for site vicinity; and established that seismic retrofit of a historic ranch building cluster could proceed. Trench investigation involved fast-track exploration, tight coordination with Parks authorities, and management of high groundwater condition through trench design and pumping program.

Laboratory Procedures:

Moisture Content and Dry Density (ASTM D2937), Atterberg Limits (ASTM D4318), Grainsize analysis (ASTM D422), (ASTM D1140), Compaction (ASTM D1557), Unconfined Compression (ASTM D2166), Cal Trans Testing 226,231,216, AASTO Certified January 2013.

Tuesday, July 07, 2026 Reg CC MTG, Page *142
Forms
Attachment 2
Tuesday, July 07, 2026 Reg CC MTG, Page *143
Addendum No. 1
February 18, 2026

Page 8 ends

CITY HALL OFFICES • 24300 NARBONNE AVENUE, LOMITA • CALIFORNIA 90717 (310) 325-7110 • FAX (310) 325-4024 • www.lomitacity.com

ACKNOWLEDGEMENT OF ADDENDUM
Slope Stabilization on Palos Verdes Drive North
Complete and sign this acknowledgement form. Enclose the original copy of the acknowledgement in your proposal. Failure to do so may result in disqualification of your firm’s proposal.

The undersigned acknowledges receipt of Addendum No. 1 dated February 18, 2026.

ATTEST: *HR/RJLF$VVRFLDWHV,QF____________
Principal: -RKQ0+RZHU3*&(*___________
Address: (*XDVWL5RDG6XLWH2QWDULR&$

By: _____________________________________
Title: 6HQLRU9LFH3UHVLGHQW____________________
Tuesday, July 07, 2026 Reg CC MTG, Page *144
Tuesday, July 07, 2026 Reg CC MTG, Page *145

ATTACHMENT D
CLAIMS HISTORY - Geologic Associates, Inc.

Each Consultant shall submit a summary of whether or not any of the following events have occurred within the past (10) years and, if so, a brief description of the circumstances involved (including, without limitation, the names of parties involved, current status and final disposition of the matter of dispute):

Failure to disclose any circumstances requested in the following paragraphs is grounds for disqualification.
▪ Failure by Consultant or any sub-consultant to enter into a contract to which it has received an award by a public entity. (none)
▪ Forfeiture of a bid or proposal bond by proposer or any sub-consultant. (none) ▪ Termination for default under a contract awarded by a public entity to Consultant or any sub-consultant. (none)
▪ Debarment of Consultant or any sub-consultant by any municipal, county, state, federal, or local agency (note: debarment is grounds for automatic disqualification). (none)
▪ The filing of a lawsuit or arbitration in which the Consultant or a sub-consultant was a defendant or cross-defendant at any time within the past ten (10) years that involved the performance of project, program, or engineering services and that involved an amount in controversy sought to be recovered from Consultant or the sub-consultant of more than $100,000.00. (see attached) ▪ Conviction of Consultant, a sub-consultant, or any of their principals or officers for violation of a state or federal antitrust law involving bid rigging, collusion, or restriction on competition between bidders, or conviction of violating any other federal or state law relating to bidding or contract performance (note: such conviction is grounds for automatic disqualification). (none) ▪ Any publications involving firm or principals alleging or claiming corruption (such claims are grounds for automatic disqualification). (none) ▪ Any suspension, revocation, or other disciplinary proceeding relating to a contracting or professional license issued to proposer or a sub-consultant. (none) Tuesday, July 07, 2026 Reg CC MTG, Page *146
LIST OF ALL LITIGATION INVOLVING GEOLOGIC ASSOCIATES, INC. AND ITS

WHOLLY OWNED SUBSIDIARIES DURING THE PAST TEN YEARS
A. CURRENTLY PENDING LITIGATION:

1. Michael A. Gerek, et. al. v. Zurich American Insurance Company, Northway Fence Incorporated, Pavement Maintenance Incorporated, James Peterson Sons, Incorporated, Buteyn-Peterson Construction Company, Incorporated, Kunkel Engineering Group, a Limited Liability Company, Mega Rentals, Limited Liability Company, Village of Lisbon, County of Waukesha, et. al.

On or about April 8, 2026, Kunkel Engineering Group, a wholly owned subsidiary of Geo-Logic Associates, Inc., was served with a Complaint in the above referenced case. That pleading alleges that the plaintiff, who was riding a motorcycle at the time, was involved in an accident on July 18, 2023 on a road that was under construction and/or being repaired. The Complaint contains negligence causes of action against each of the defendants. The boiler plate Complaint is very generic in describing the identical claims that it makes against each of the defendants. This case was filed on March 31, 2026 in the Waukesha Circuit Court, in the State of Wisconsin. Because of the very early stage of this case and the very generic allegations in the Complaint, it is not possible to say anything further about this case at this time.

2. Government of Guam v. Gershman, Brickner & Bratton, Inc; Black Construction Corporation; Brown & Caldwell; Geo-Logic Associates f/k/a Vector Engineering, Inc. f/k/a Ausenco Vector; and GHD, Inc. f/k/a Winzler & Kelly, Federal District Court of Guam, Civil Case No. 1:24-CV-00011.

On May 6, 2024, the Government of Guam (“Guam”) filed a lawsuit in the Federal District Court of Guam against 4 entities, including Geo-Logic Associates, Inc. (“Company”), involved in the design and closure of the Ordot Dump facility on Guam. Discovery has begun. Late last year, the Chief Judge of the Guam Federal District Court has ordered this case and a related case to mediation. It is the Company’s position that it performed its services properly; and, therefore, it intends to vigorously resist and forcefully respond to the claims made against it in this action by Guam. However, the Company intends to in good faith participate in the court ordered mediation. Two sessions of that mediation took place on March 24th and 25th in Los Angeles.

Although the case did not settle, the mediator is trying to get the Parties to agree to another mediation session.

B. RESOLVED LITIGATION:

1. Jeffrey R. Walker and Kelly C. Hendrix vs. Fieldstone Partners, California, LLC, Fieldstone Residential Builders, LLC, RSM 8, LLC, Geologic Associates, Inc., and many others, Orange County Superior Court, Case No.: 30-2022-01274812- CU-OR-CXC.

This lawsuit was filed on August 10, 2022 by attorneys representing the owners of the house at 21401 Vista Drive, Trabuco Canyon, Orange County California (“Property”). The allegations in that Complaint against the Company are that its services in connection with the grading of the tract Tuesday, July 07, 2026 Reg CC MTG, Page *147
and the Property were performed negligently resulting in damages to the Property. In April of 2023, plaintiffs dismissed the Company from this lawsuit without any consideration being paid by the Company.

2. Arizona Public Service Company v. Layne Christensen Company and Clear Creek Associates, LLC, Arizona Superior Court, Maricopa County, Case No. CV2023-09113.

Arizona Public Service Company (“APS”) filed a Complaint on December 6, 2023, in Arizona Superior Court, Maricopa County, claiming that Clear Creek Associates (“CC”), a wholly owned subsidiary of GeoLogic Associates, Inc., breached its contract with APS and that it performed its services negligently. The contract at issue was to design and perform limited construction management services during construction of a 2500-foot-deep water well. CC believes any problem with the functioning of the well is the fault and responsibility of Layne Christensen Company (“Layne”), the drilling company that constructed the well. APS has made virtually identical claims in its Complaint against Layne. CC and Layne settled this lawsuit with APS at the end of 2024. The terms of this settlement are confidential.

3. Geo-Logic Associates, Inc. v. Metal Recovery Solutions, Inc.

On September 13, 2017, Geo-Logic Associates, Inc. (the “Company”) filed a lawsuit against Metal Recovery Solutions, Inc. (“MRS”) and its owner, Dr. Thomas Seal, in United States District Court, District of Nevada, Case No. 3:17-cv-00563-MMD-WGC (the “Civil Action”), alleging claims for relief for (a) Breach of Contract (Phase II Work Order); (b) Breach of Contract (Phase III Word Order); (c) Misappropriation of Trade Secrets; (d) Unjust Enrichment and Restitution; (e) Quantum Meruit; and (f) Accounting. The crux of the Company’s claims is that MRS did not pay the Company for its services and did not share profits from a project, as the Company contends is contractually required.

On October 24, 2017, the parties to the Civil Action stipulated to arbitrate certain claims and stay the Civil Action. On November 8, 2017, the Company filed a Demand for Arbitration with JAMS pursuant to the stipulation, JAMS Case No. 1260004635 (the “Arbitration”), alleging the same claims against MRS as in the Civil Action, except that the Company did not pursue its trade secret misappropriation claim in arbitration, and the Company did not name Dr. Seal as a respondent in the arbitration.

On November 22, 2017, MRS filed a Response to the Demand for Arbitration, denying the material allegations and asserting affirmative defenses. MRS also asserted a Counterclaim (the “Counterclaim”) against the Company for trade secret misappropriation. The gist of MRS’s Counterclaim is that the Company allegedly failed to timely return certain business records of MRS.

On December 6, 2017, the Company filed an Answer to the Counterclaim, asserting a general denial and several affirmative defenses.

Tuesday, July 07, 2026 Reg CC MTG, Page *148
On April 3, 2018, the Arbitrator issued an Order permitting MRS to file an Amended Counterclaim, adding claims for relief for Breach of Contract, Breach of the Covenant of Fair Dealing, Trade Secret Misappropriation, and Trademark Infringement. The crux of MRS’s Amended Counterclaim is that the Company allegedly misappropriated key elements of MRS’s trade secret technology to conduct competitive activities.

On April 24, 2018, the Company filed an Answer to the Amended Counterclaim, asserting a general denial and several affirmative defenses.

On August 13, 2018, the Arbitrator issued an Order denying a Motion for Temporary Restraining Order that MRS had filed back on February 8, 2018. The Motion had been briefed extensively prior to the Arbitrator’s ruling. The Arbitrator held that MRS had failed to clearly demonstrate a likelihood of success on the merits of its counterclaims, that the balance of hardships tipped in favor of the Company, and that issuing an injunction would not be in the public interest.

The parties have engaged in extensive written discovery and have produced tens of thousands of documents to each other.

In April 2019, the arbitrator granted the Company's motion for summary judgment on MRS' claims for trade secret misappropriation, trademark infringement, and breach of &e of the agreements between the parties.

The arbitration hearing on the Company's claims and MRS' remaining claims took place on May 28 through May 31,2019 in Reno, Nevada. On August 31 2019, the arbitrator issued his decision in favor of the Company awarding it$2,037,676, plus prejudgment interest, on its claims and finding in favor of the Company on MRS' Counterclaim. On January 6, 2020, a judgment was entered in favor of the Company and against MRS in the amount of $2,0371676, plus prejudgment interest. Of that amount, MRS has already paid GLA approximately $140,000.

Tuesday, July 07, 2026 Reg CC MTG, Page *149

ATTACHMENT D

CLAIMS HISTORY
Each Consultant shall submit a summary of whether or not any of the following events have occurred within the past (10) years and, if so, a brief description of the circumstances involved (including, without limitation, the names of parties involved, current status and final disposition of the matter of dispute):

Failure to disclose any circumstances requested in the following paragraphs is grounds for disqualification.
▪ Failure by Consultant or any sub-consultant to enter into a contract to which it has received an award by a public entity.
▪ Forfeiture of a bid or proposal bond by proposer or any sub-consultant. ▪ Termination for default under a contract awarded by a public entity to Consultant or any sub-consultant.
▪ Debarment of Consultant or any sub-consultant by any municipal, county, state, federal, or local agency (note: debarment is grounds for automatic disqualification). ▪ The filing of a lawsuit or arbitration in which the Consultant or a sub-consultant was a defendant or cross-defendant at any time within the past ten (10) years that involved the performance of project, program, or engineering services and that involved an amount in controversy sought to be recovered from Consultant or the sub-consultant of more than $100,000.00.
▪ Conviction of Consultant, a sub-consultant, or any of their principals or officers for violation of a state or federal antitrust law involving bid rigging, collusion, or restriction on competition between bidders, or conviction of violating any other federal or state law relating to bidding or contract performance (note: such conviction is grounds for automatic disqualification).
▪ Any publications involving firm or principals alleging or claiming corruption (such claims are grounds for automatic disqualification).
▪ Any suspension, revocation, or other disciplinary proceeding relating to a contracting or professional license issued to proposer or a sub-consultant. - Bancroft Construction Services
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Tuesday, July 07, 2026 Reg CC MTG, Page *150

ATTACHMENT E

LEVINE ACT STATEMENT
Tuesday, July 07, 2026 Reg CC MTG, Page *151
California Levine Act Statement
California Government Code Section 84308, commonly referred to as the "Levine Act," prohibits any Lomita City Councilmember from participating in any action related to contracts if he or she receives any political contributions totaling more than $250 within the previous twelve (12) months, and for twelve (12) months following the date a final decision concerning the contract has been made, from the person or company awarded the contract.

The Levine Act also requires disclosure of such contribution by a party to be awarded a specific contract. Proposers are encouraged to review the requirements of the Levine Act at Government Code Section 84308 and any accompanying regulations adopted by the Fair Political Practices Commission (FPPC). Current Lomita City Councilmembers are listed at: https://lomitacity.com/citycouncil/ Proposers are responsible for accessing this link to review the names prior to answering the following questions.

1. Have you or your company, or any agent on behalf of you or your company, made any political contributions of more than $250 to any Lomita City Councilmember in the 12 months preceding the date of the submission of your proposal or application?
YES If yes, please identify the Councilmember(s):

NO

2. Do you or your company, or any agency on behalf of you or your company, anticipate or plan to make any political contribution of more than $250 to any Lomita City Councilmember in the 12 months before or following any Council action related to your proposal or application?
YES If yes, please identify the Councilmember(s):

NO
Answering yes to either of the two questions above does not preclude the Lomita City Council from awarding a contract or approving an application or any subsequent action. It does, however, preclude the identified Councilmember(s) from participating in any actions related to your proposal or application.

Date
Signature of authorized individual
Company/Applicant Name
X
X
06/25/2026
Geologic Associates, Inc.

John M. Hower, Senior Vice President
Tuesday, July 07, 2026 Reg CC MTG, Page *152
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Deanna Fraley, PE, Public Works Director
MEETING DATE: July 7, 2026
SUBJECT: Purchase of Public Works Equipment and Installation of Automated Security Access Gates

RECOMMENDED ACTION
Approve a Public Works Agreement with Ed’s Fencing, Inc. for the installation of two automated security access gates at the Public Works Yard and Cypress Water Production Facility in an amount not to exceed $45,208.00; and authorize the following purchases:

1. Vermeer SC48TX Stump Grinder through Sourcewell Contract No. 010925-VRM in an amount not to exceed $90,839.39;

2. Replacement of the dump bed and hydraulic system on the City’s 2013 Freightliner dump truck by Superior Trailer in an amount not to exceed $48,250.00;

3. CAT Model 260 Skid Steer Loader through Sourcewell Contract No. 011723-CAT in an amount not to exceed $108,710.12; and,

4. Toku TNB-6M Hydraulic Breaker Attachment in an amount not to exceed $13,481.00.

BACKGROUND
The City of Lomita’s Public Works Department relies on specialized equipment and vehicles to maintain the City’s streets, trees, sidewalks, parks, and water distribution system. To maintain efficient operations and continue providing timely maintenance services, staff have identified several equipment replacement and facility improvement needs that are included in the adopted Fiscal Year Capital and Equipment Replacement Program.

The proposed purchases include replacement of two pieces of equipment that have exceeded their useful service life and are becoming increasingly costly to maintain, as well as acquisition of two additional pieces of equipment that will expand the City’s ability to perform maintenance activities in-house. Staff also recommends the installation of

CITY OF LOMITA

CITY COUNCIL REPORT
Item No.
7h
Tuesday, July 07, 2026 Reg CC MTG, Page *153
2 automated security access gates at the Public Works Yard and Cypress Water Production Facility to improve facility security and protect City vehicles, equipment, and critical water infrastructure.

DISCUSSION
Stump Grinder Replacement
The existing stump grinder has been in service for approximately 30 years and has exceeded its expected service life. The equipment is frequently used by the Streets/Trees and Parks Division for stump removal and associated with sidewalk repairs, tree maintenance, and park improvements. Due to its age and increasing maintenance requirements, replacement is more cost-effective and efficient than continued repairs.

Staff recommends purchasing a Vermeer SC48TX Stump Grinder through the competitively bid Sourcewell cooperative purchasing contract. The recommended purchase includes the stump grinder, trailer, freight, and delivery for a total cost of $90,839.39.

Dump Bed Replacement
The City’s 2013 Freightliner dump truck is utilized daily by all Public Works divisions to transport construction materials, debris, and maintenance equipment. While the truck chassis remains in good operating condition, the dump bed has deteriorated beyond its useful life. The steel bed has become excessively worn, the tailgate is no longer functional, and hydraulic hoist system requires replacement.

Rather than replacing the entire vehicle, staff recommends replacing the dump bed assembly and hydraulic system, which provides a substantially more economical solution while extending the useful life of the truck. Three quotes were obtained, with Superior Trailer submitted the lowest responsive quote of $48,250.00. The purchase includes removal of the old dump bed body, installation of a new dump bed body, and new hydraulic system.

Skid Steer Loader
Staff recommends purchasing a CAT Model 260 Skid Steer Loader to improve operational efficiency and expand the Department’s ability to perform maintenance work in areas where the City’s current heavy, and bulkier, equipment cannot access.

Currently, many maintenance activities must be completed using a backhoe loader, which is larger, heavier, and less maneuverable than a skid steer. A skid steer will improve access in tight work areas, reduce damage to sidewalk and landscaped areas, and increase efficiency for water utility repairs, park maintenance, and sidewalk reconstruction projects. The recommended purchase also includes broom and forklift attachments, allowing crews to perform street sweeping following utility repairs and unload deliveries without relying on rented equipment. Staff evaluated multiple skid steer models and determined that the CAT Model 260 best meets the City’s operational needs based on performance, ease of maintenance, and the availability of replacements parts and local Tuesday, July 07, 2026 Reg CC MTG, Page *154
3 service support. Staff recommends purchasing the equipment through the competitively bid Sourcewell cooperative purchasing contract for a total cost of $108,710.12. The purchase includes the skid steer loader, training materials, and freight delivery costs.

Hydraulic Breaker Attachment
Staff recommends purchasing a hydraulic breaker attachment for the City’s existing backhoe loader. The attachment will significantly improved productivity by allowing crews to remove concrete much quicker than traditional pneumatic jackhammers/ This equipment will expand the City’s ability to complete sidewalk, curb, and concrete repairs with City crews, reducing reliance on outside contractors, and lowering long-term maintenance costs. Staff recommend purchasing the Toku TNB-6M for a cost of $13,481.00.

Automated Security Access Gates
Staff recommends replacing the existing manual gates at both the Public Works Yard and Cypress Water Production Facility with automated security access gates.

The current gates remain open during normal business hours, allowing unrestricted access to City maintenance facilities where vehicles, equipment, materials, and critical water infrastructure are stored. Automated gates will improve employee safety, enhance site security, and better protect City assets while maintaining convenient access for authorized personnel.

Three quotes were received from Automated Gate Services, Inc., Ed’s Fencing, Inc., and Gate & Garage Masters. Staff recommends awarding the contract to Ed’s Fencing, Inc., the lowest responsive bidder, in the amount of $45,208.00.

FISCAL IMPACT
The total cost of the recommended purchases and public work contract is $306,488.51.

The equipment purchases and automated security gates are budgeted in the Adopted FY 26-27 Adopted Budget in the Equipment Replacement Fund and Water Capital Fund.

ITEM TOTAL COST
Stump Grinder $ 90,839.39
Dump Bed Replacement $ 48,250.00
Skid Steer Loader $ 108,710.12
Hydraulic Breaker Attachment $ 13,481.00
Security Gates $ 45,208.00
Total $ 306,488.51
Tuesday, July 07, 2026 Reg CC MTG, Page *155
4 VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 5: City Infrastructure & Water Utility – Investing in reliable, sustainable infrastructure.

OPTIONS

1. Approve staff’s recommendation.

2. Provide alternative direction.

ATTACHMENTS

1. Stump Grinder Quote

2. Dump Bed Replacement Quote

3. Skid Steer Loader Quote

4. Hydraulic Breaker Attachment Quote

5. Public Works Contract with Ed’s Fencing for automated security gate installation Prepared by: Approved by:
_______________________ ______________________
Deanna Fraley, PE Andrew Vialpando
Public Works Director City Manager
Tuesday, July 07, 2026 Reg CC MTG, Page *156
Investment Proposal (Quote)
RDO Equipment Co.
1300 Kona Drive
Rancho Dominguez CA, 90220
Phone: (310) 223-2400 - Fax: (310) 223-2424
Proposal for:

CITY OF LOMITA
24300 NARBONNE AVE
LOMITA, CA, 907171198

LOS ANGELES
Investment Proposal Date:

Pricing Valid Until:

Deal Number:

Customer Account#:

Account Manager:

Phone:

Fax:

Email:
2/2/2026
12/31/2026
1883994
7110003
Lance Barker
1 (424) 349-1407
[email protected]
Comments
Sourcewell Contract #
010925-VRM Tree Maintenance Equipment, Attachments, Accessories, and Related Services Equipment Information
Quantity Serial Number
Stock Number
Hours
(approx.)
Status / Year / Make / Model
Additional Items
Cash Price
1 TBD
TBD
0 New 2026 VERMEER SC48TX $79,891.00
SC48TX1000 SC48TX BASE UNIT
SC48TX1150 SC48TX DIESEL ENGINE
SC48TX1450 OPERATORS STATION W/REMOTE
SC48TX1610 SC48TX GROUND DRIVE/TRACKS
SC48TX1851 SC48TX POWER FLUIDS
SC48TX2051 SC48TX DRIVESHAFT CUTTING SYSTEM W/ YELLOW
JACKET
SC48TX2301 SC48TX YELLOW JACKET CUTTING SYSTEM
SC48TX4000 SC48TX CHIP BLADE
SC48TX4800 TELEMATICS
Freight in : $895.00
Prep / Reconditioning : $600.00
Customer Discount Sourcewell Contract ($11,184.74)
1 TBD
TBD
0 New 2026 BUTLER LT712 $10,550.00
LT712 TANDEM AXLE TILT TRAILER GVWR - 7,000 LBS.

EMPTY WEIGHT 1,730 LBS.

Freight in : $1,000.00
Prep / Reconditioning : $450.00
Equipment Subtotal: $82,201.26
Purchase Order Totals
Balance: $82,201.26
CA STATE TAX: $4,932.08
CA COUNTY TAX: $205.50
CA CITY TAX: $616.51
CA SPECIAL TAX: $2,877.04
Sales Tax Total: $8,631.13
CA Tire Fee: $7.00
Sub Total: $90,839.39
Cash with Order: $0.00
Balance Due: $90,839.39
D1883994 Page 1 of
1 Tuesday, July 07, 2026 Reg CC MTG, Page *157
9600 E Ave. Hesperia, CA 92345
Office 909-350-0185 - Fax 909-350-3816
QUOTE
April 4, 2025
(Revised 6-8-2026)
City of Lomita Water Department
Attn: Van Mesa
24300 Narbonne Ave. Lomita, CA 90717
Office: 310-304-3632 / Mobile: 310-508-3755
12’ Square Municipal Dump Body
5 Cubic yards. 1/4” AR450 HX floor, 3/16” AR450 HX sides. 36” Tall gate & sides. 9” Spreader apron with chains. Trunion mount hoist. Flaps rear and front. Frame mount tail lights, 4 markers.

Air shift PTO, cable control pump, wet kit. Cab controls. Sandblast prime paint body WHITE.

All per customer specs and requirements.

Base price $32,250.00
Options added to base price
2- Red oval “rear” facing post lights $250.00
2- Amber oval “side” facing post lights $250.00
Large cab guard $1,000.00
Doghouse style front hoist panel $1,500.00
Auto tarp system no flaps (Asphalt rated) $3,500.00
Retractable pull out side ladder with handle (CS) $1,000.00 Dual acting rear gate (Top hinge, drop down & side swing) $2,000.00 35 Gal hydraulic tank $1,500.00
3- Center ditch gates $3,000.00
Hotshift PTO (Auto trans) $1,500.00
Remove old body prep chassis for new body (Scrap body) $500.00 Cost with options $48,250.00
Extra options available NOT included
Tool holder (Broom or Shovel) $250.00
SS light panels on flaps (6 Lights) $850.00
Air mud flaps no lights $1,000.00
Dump bed vibrator $1,600.00
12” Amber strobe bar with swivel (Top of cab Guard) $2.100.00 6- Way strobes (2 grille, 2 sides & 2 rear post) $2,600.00 370 Premier hitch assembly with D-Rings $3,500.00
CA 88” / AF 50”
Price valid for 30 days. Pricing may change without notice.

Payment terms: Due upon delivery. FOB Hesperia. Due to trucks running out of fuel during install. Trucks drop shipped and or delivered under 1/4 tank of fuel will be charged $250.00 fueling fee. This charge will be added to final invoice.

Sign ______________________________ PO# __________________ Date _________________ Mike V. Espinosa
Superior Trailer Works
Direct 909-578-8595
“COMMITTED TO CUSTOMER SERVICE” Tuesday, July 07, 2026 Reg CC MTG, Page *158 Quote 186790-01

Page 1 of 6 ends

186790-01
Jun 11, 2026

CITY OF LOMITA
Attention: Account Payable

OFFICE OF THE CITY CLERK
LOMITA, California 90717-1230
Attention: VAN MESA
Dear Sir,
We would like to thank you for your interest in our company and our products, and are pleased to quote the following for your consideration.

One (1) New Caterpillar Inc. Model: 260 Skid Steer Loader including standard and optional equipment as listed below.

Sourcewell #011723 - CAT
We wish to thank you for the opportunity of quoting on your equipment needs. This quotation is valid for 30 days, after which time we reserve the right to re-quote. If there are any questions, please do not hesitate to contact me.

Sincerely,
Leo Jasso
Machine Sales Representative
Tuesday, July 07, 2026 Reg CC MTG, Page *159
Quote 186790-01

Page 2 of 6 ends

One (1) New Caterpillar Inc. Model: 260 Skid Steer Loader including standard and optional equipment as listed below.

STANDARD EQUIPMENT
POWERTRAIN -Cat C2.8T turbocharged diesel engine --Gross horsepower per ISO 14396 -74 hp (55 kW) --Glow plugs starting aid --Liquid cooled, direct injection -Air cleaner, dual element, radial seal -S-O-S sampling valve, hydraulic oil -Ecology drain - coolant -Filter, hydraulic supply, cartridge type -Filter, hydraulic return, cartridge type -Filter, canister type, engine oil -Filter, canister type, fuel -and water separator -Radiator / hydraulic oil -cooler (side-by-side) -Spring applied, hydraulically released, -parking brakes -Hydrostatic transmission -Four wheel chain drive -Lockable fuel cap -Auto engine idle - HYDRAULICS -Selectable control pattern - ISO or H -Electro/hydraulic implement control -Electro/hydraulic hydrostatic -transmission control -Heavy duty flat faced quick disconnects -with integrated pressure release lever ELECTRICAL -Work Tool Electrical Harness -Heavy duty battery --includes battery disconnect with -lockout feature -12 volt electrical system -85 ampere alternator -LED work lights -Auto reverse lights -Switch backlighting -Interior LED dome light -Backup alarm -Electrical outlet, beacon -Courtesy lighting, exterior - OPERATOR ENVIRONMENT -Operator warning system indicators: --Air filter restriction --Alternator output --Armrest raised / operator out of seat --Engine coolant temperature --Engine oil pressure --Glow plug activation --Hydraulic supply filter restriction --Hydraulic oil temperature --Park brake engages --Engine emission system -(where applicable) -Control interlock system, when operator -leaves seat or armrest raised: --Hydraulic system disables --Hydrostatic transmission disables --Parking brake engages -ROPS cab, tilt up -FOPS, Level I -Color LCD monitor: --Creep speed control --Drive response adjustment --Implement response adjustment --Drive Power Priority adjustment --Language selection (x32) --Date, Time, Units, and brightness -settings --Multi-operator Anti-theft Security -System & Monitoring --Maintenance schedule and reminders --Event and Diagnostic Code monitoring --Smart Technology, enables use of -Smart Attachments -Gauges: fuel level, hour meter, -hydraulic temperature, battery -voltage, tachometer. -Rear View Camera -Cell Phone Storage Pocket -Cup Holder -Ergonomic contoured armrest -Independently adjustable, seat -mounted joystick controls. -Top and rear windows -Floormat -Headliner -Interior rear view mirror -Horn -Hand (dial) throttle, electronic -12 volt power port -Rear window breaker hammer
FRAMES -Lift linkage, vertical path -Chassis, one piece welded -Machine tie down points (9) -Removable panels for machine -frame cleanout -Support, lift arm -Steel rear and front bumpers, welded -Fuel fill, machine right hand side OTHER STANDARD EQUIPMENT -Steel engine door with replaceable -louvers -Engine door - lockable -Extended life antifreeze (-37C, -34F) -Work tool attachment coupler -Hydraulic oil level sight gauge -Radiator coolant level sight gauge -Radiator expansion bottle -Cat ToughGuard TM hose -Hydraulic demand cooling fan Tuesday, July 07, 2026 Reg CC MTG, Page *160
Quote 186790-01

Page 3 of 6 ends

MACHINE SPECIFICATIONS
260 05A SKID STEER LOADER 601-2110
LANE 2 ORDER 0P-9002
CAB PACKAGE, PRO PLUS 661-5346
GUARDING / SEALING PKG, (HD0) 586-0091
HYDRAULICS, PERFORMANCE, (HP1) 586-0012
RIDE CONTROL 585-9528
STARTING PACKAGE, STANDARD 652-2073
FUEL, MANUAL PRIMING 607-0943
WORKLIGHTS, LED, FRONT/REAR 579-2310
ROADING LIGHTS 607-8330
COMFORT PKG, ENCLOSED CAB,HVAC 657-2195
AIR CONDITIONING, R134A REF 661-1438
SEAT,AIR SUSPENSION,CLOTH,HEAT 585-9587
DOOR, CAB, POLYCARBONATE 593-7244
INTEGRATED RADIO 651-8586
SEAT BELT, 3'' 613-1925
PACKAGE, TECHNOLOGY (T4) 607-8407
FAN, COOLING, DEMAND 624-1809
PRODUCT LINK, CELLULAR PLE643 579-2324
TIRES, 12/16.5 CAT 10PR 650-7297
QC, HYD DUAL SELF-LEVEL 586-0034
CERTIFICATION ARR, P65 643-7211
INSTRUCTIONS, ANSI, USA 585-9542
SERIALIZED TECHNICAL MEDIA KIT 421-8926
POWERTRAIN, 2-SPEED 585-9525
BEACON, AMBER LED 638-6745
HOSE GUIDE, ATTACHMENT 640-5405
MOUNTING, FIRE EXTINGUISHER 594-1961
SHIPPING/STORAGE PROTECTION 643-1300
PACKING, ROLL ON - ROLL OFF 0P-0226
BROOM, UTILITY, BU118, POLY 626-4232
KIT, WATER TANK, 47 US GAL 610-5876
KIT, WATER SPRINKLER, BU 623-4203
BUCKET-GP, 80'', BOCE 279-5377
CARRIAGE, PAL C2, 46'', SSL 351-9371
FORK, PAL C2, 48'' X 4'' X 1.6'' 195-8545
HAMMER, B8 532-9108
BRACKET, LINES, SSL, MD-LG 532-9240
Tuesday, July 07, 2026 Reg CC MTG, Page *161
Quote 186790-01

Page 4 of 6 ends

Base Model Part # List Price
260 with 2026 Pricing
89,352.00
July 2% Price increase
1,787.04
Sub Total, Machine
91,139.04
Min Member Disc 21.0%
(19,139.20)
Machine / Option Price
71,999.84
Work Tools / Attachments
BROOM, UTILITY, BU118, POLY

7,500.00
KIT, WATER TANK, 47 US GAL

1,632.00

KIT, WATER SPRINKLER, BU

496.00
BUCKET-GP, 80", BOCE

2,174.00
CARRIAGE, PAL C2, 46", SSL

715.00
FORK, PAL C2, 48" X 4" X 1.6"

522.00
HAMMER, B8

11,125.00

BRACKET, LINES, SSL, MD-LG

1,597.00
July 2% Price increase

535.22
Sub Total
26,296.22
Member Disc 21.0%
(5,522.21)
Work Tool / Attachments Price
20,774.01
Customer Invoice
Machine / Option Price
71,999.84
Work Tool / Attachments Price
20,774.01
Tuesday, July 07, 2026 Reg CC MTG, Page *162
Quote 186790-01

Page 5 of 6 ends

Pre-Tax Total
92,773.86
Pre-Prep Total
92,773.86
Nondiscountable Items
Delivery
650.00
PDI
1,000.00
Machine Prep
2,750.00
Manuals, (1) set CD/DVD
1,200.00
Total 98,373.86
Tuesday, July 07, 2026 Reg CC MTG, Page *163
Quote 186790-01

Page 6 of 6 ends

WARRANTY & COVERAGE
Standard Warranty: 24 MONTHS / 2,000 HOURS FULL MACHINE SELL PRICE $98,373.86
NET BALANCE DUE $98,373.86
TIRE FEE $7.00
SALES TAX (10.5%) $10,329.26
AFTER TAX BALANCE $108,710.12

PAYMENT TERMS
Cash Invoice Terms

CASH WITH ORDER
$0.00
F.O.B/TERMS:

City Of Industry Machine
Accepted by___________________________________ on ____________________ ______________________________
Signature
Tuesday, July 07, 2026 Reg CC MTG, Page *164

QUOTATION
DATE: 3/10/2026
14635 VALLEY BLVD 11318 NORWALK BLVD
FONTANA, CA 92335 SANTA FE SPRINGS, CA 90670
43136 RANCHO WAY
TEMECULA, CA 92590
CUSTOMER: SALESPERSON: German Pinedo
ADDRESS OFFICE: (909) 822-2200
CITY, STATE, ZIP FAX: (909) 822-4850
CONTACT: CELL: 909 491 9096
EMAIL:

OFFICE:

FAX:

CELL:

SHIP VIA: F.O.B. FONTANA, CA PRICES BELOW ARE GOOD FOR 10 DAYS

QUANTITY DESCRIPTION UNIT PRICE AMOUNT
Equip and/or Serial Number
1 TBD $12,200.00 $12,200.00
SUBTOTAL $ 12,200.00
Purchase Order # Company_______________________ TAX $ 1,281.00 DELIEVERY $ -
Date: _________ Signature/ Title: ______________________________________ DMV $ - DEP / DN PYMT $ -
TOTAL $ 13,481.00
Travel Time Is Not Covered By Warranty
All Warranty is Performed at Scott Equipment Service Shop Description
TNB-6M-TLBQC
Tuesday, July 07, 2026 Reg CC MTG, Page *165

Page 1 of 10 ends

CITY OF LOMITA

PUBLIC WORKS AGREEMENT
This Public Works Agreement (“Agreement”) is made and entered into as of the date executed by the City Manager and attested to by the City Clerk, by and between Ed’s Fencing, Inc., a California corporation, (hereinafter referred to as "CONTRACTOR") and the City of Lomita, California, a municipal corporation (hereinafter referred to as "CITY").

R E C I T A L S
A. Pursuant to the receipt of quotes received for the installation of automated security gates at the Public Works Yard and Cypress Water Production Facility, three quotes were received, opened, and reviewed.

B. On Tuesday, July 7, 2026, Lomita’s City Council declared CONTRACTOR to be the selected contractor and accepted the CONTRACTOR’s quote.

C. The City Council has authorized the City Manager to execute a written contract with CONTRACTOR for furnishing labor, equipment and material for the Automated Security Gates Project in the City of Lomita.

NOW, THEREFORE, in consideration of the foregoing and the mutual covenants herein contained, it is agreed:

1. GENERAL SCOPE OF WORK: CITY agrees to engage CONTRACTOR and CONTRACTOR agrees to furnish all necessary labor, tools, materials, appliances, and equipment for and do the work for the Automated Security Gates Project in the City of Lomita. The work shall be performed in accordance with the Plans and Specifications (the “Specifications” attached as Exhibit A) and in accordance with bid prices set forth in CONTRACTOR’S Bid Proposal (attached as Exhibit B) and in accordance with the instructions of the City Engineer.

2. INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY:

The contract documents for the aforesaid project, a complete set of which is on file with the Lomita City Clerk’s Office, shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications, Special Provisions, and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said contract documents are made a part hereof as though fully set forth herein. This Tuesday, July 07, 2026 Reg CC MTG, Page *166

Page 2 of 10 ends

contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the contract or not. Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.

3. COMPENSATION: CONTRACTOR agrees to receive and accept the prices set forth in its Bid Proposal as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid contract documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.

4. TIME OF PERFORMANCE: CONTRACTOR agrees to complete the work within calendar days from the date of the notice to proceed. By signing this Agreement, CONTRACTOR represents to CITY that the contract time is reasonable for completion of the work and that CONTRACTOR will complete such work within the contract time. In accordance with Government Code Section 53069.85, CONTRACTOR agrees to forfeit and pay CITY as liquidated damages, not as a penalty, the sum of $1,000.00 per day for each and every day of unauthorized delay beyond the completion date, which amount shall be deducted from any payments due or to become due the CONTRACTOR.

5. PREVAILING WAGES:

A. Pursuant to Labor Code § 1720, and as specified in 8 California Code of Regulations § 16000, CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR’s responsibility to interpret and implement any prevailing wage requirements and CONTRACTOR agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws.

B. In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY’s Engineering Division or the website for State of California Prevailing wage determination at http://www.dir.ca.gov/DLSR/PWD. CONTRACTOR must post a copy of the prevailing rate of per diem wages at the job site.

Tuesday, July 07, 2026 Reg CC MTG, Page *167

Page 3 of 10 ends

C. CITY directs CONTRACTOR’s attention to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONTRACTOR or any subcontractor.

D. Labor Code § 1777.5 requires CONTRACTOR or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:
(1) When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or
(2) When the number of apprentices in training in the area exceeds a ratio of one to five, or
(3) When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or
(4) When CONTRACTOR provides evidence that CONTRACTOR
employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. (5) CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if CONTRACTOR employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions. (6) CONTRACTOR and any subcontractor must comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices. (7) Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

E. CONTRACTOR and its subcontractors must keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with this Agreement.

Tuesday, July 07, 2026 Reg CC MTG, Page *168

Page 4 of 10 ends

The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement. If requested by CITY, CONTRACTOR must provide copies of the records at its cost.

6. LEGAL HOURS OF WORK: Eight (8) hours of labor shall constitute a legal day's work for all workmen employed in the execution of this contract, and CONTRACTOR and any subcontractor under it shall comply with and be governed by the laws of the State of California having to do with working hours set forth in Division 2, Part 7, Chapter 1, Article 3 of the Labor Code of the State of California as amended.

CONTRACTOR shall forfeit, as a penalty to CITY, twenty-five dollars ($25.00) for each laborer, workman or mechanic employed in the execution of the contract, by him or any subcontractor under it, upon any of the work hereinbefore mentioned, for each calendar day during which the laborer, worker or mechanic is required or permitted to labor more than eight (8) hours in violation of the Labor Code.

7. TRAVEL AND SUBSISTENCE PAY: CONTRACTOR agrees to pay travel and subsistence pay to each worker needed to execute the work required by this Agreement as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Labor Code Section 1773.8.

8. CONTRACTOR'S LIABILITY: The City of Lomita and its officers, agents and employees ("Indemnitees") shall not be answerable or accountable in any manner for any loss or damage that may happen to the work or any part thereof, or for any of the materials or other things used or employed in performing the work; or for injury or damage to any person or persons, either workers or employees of CONTRACTOR, of its subcontractors or the public, or for damage to adjoining or other property from any cause whatsoever arising out of or in connection with the performance of the work. CONTRACTOR shall be responsible for any damage or injury to any person or property resulting from defects or obstructions or from any cause whatsoever.

CONTRACTOR will indemnify Indemnitees against and will hold and save Indemnitees harmless from any and all actions, claims, damages to persons or property, penalties, obligations or liabilities that may be asserted or claimed by any person, firm, entity, corporation, political subdivision, or other organization arising out of or in connection with the work, operation, or activities of CONTRACTOR, its agents, employees, subcontractors or invitees provided for herein, whether or not there is concurrent passive negligence on the part of any Indemnitee. In connection therewith:
a. CONTRACTOR will defend any action or actions filed in connection with any such claims, damages, penalties, obligations or liabilities and will pay all costs and expenses, including attorneys' fees, expert fees and costs incurred in connection therewith.

Tuesday, July 07, 2026 Reg CC MTG, Page *169

Page 5 of 10 ends

b. CONTRACTOR will promptly pay any judgment rendered against CONTRACTOR or Indemnitees covering such claims, damages, penalties, obligations and liabilities arising out of or in connection with such work, operations or activities of CONTRACTOR hereunder, and CONTRACTOR agrees to save and hold the Indemnitees harmless therefrom.
c. In the event Indemnitees are made a party to any action or proceeding filed or prosecuted against CONTRACTOR for damages or other claims arising out of or in connection with the work, operation or activities hereunder, CONTRACTOR agrees to pay to Indemnitees and any all costs and expenses incurred by Indemnitees in such action or proceeding together with reasonable attorneys' fees.

CONTRACTOR'S obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, Contractor shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.

So much of the money due to CONTRACTOR under and by virtue of the contract as shall be considered necessary by CITY may be retained by CITY until disposition has been made of such actions or claims for damages as aforesaid.

It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California. This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law.

This indemnity is effective without reference to the existence or applicability of any insurance coverage which may have been required under this Agreement or any additional insured endorsements which may extend to Indemnitees.

CONTRACTOR, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising our of or incident to activities or operations performed by or on behalf of the CONTRACTOR regardless of any prior, concurrent, or subsequent passive negligence by the Indemnitees.

Tuesday, July 07, 2026 Reg CC MTG, Page *170

Page 6 of 10 ends

9. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, CITY will promptly inform CONTRACTOR regarding third-party claims against CONTRACTOR, but in no event later than ten (10) business days after CITY receives such claims. Such notification will be in writing and forwarded in accordance with the “Notice” section of this Agreement. As more specifically detailed in the contract documents, CONTRACTOR agrees to indemnify and defend the City against any third-party claim.

10. WORKERS' COMPENSATION: In accordance with California Labor Code Sections 1860 and 3700, CONTRACTOR and each of its subcontractors will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, CONTRACTOR, by signing this contract, certifies as follows: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake selfinsurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

11. INSURANCE: With respect to performance of work under this contract, CONTRACTOR shall maintain and shall require all of its subcontractors to maintain insurance as required in the Builders General Provisions.

12. ASSIGNMENT: This Agreement is not assignable nor the performance of neither party's duties delegable without the prior written consent of the other party. Any attempted or purported assignment or delegation of any of the rights of obligations of either party without the prior written consent of the other shall be void and of no force and effect.

13. INDEPENDENT CONTRACTOR: CONTRACTOR is and shall at all times remain as to the CITY, a wholly independent contractor. Neither the CITY nor any of its agents shall have control of the conduct of CONTRACTOR or any of CONTRACTOR'S employees, except as herein set forth. CONTRACTOR shall not at any time or in any manner represent that it or any of its agents or employees are in any manner agents or employees of CITY.

14. TAXES: CONTRACTOR is responsible for paying all retail sales and use, transportation, export, import, special or other taxes and duties applicable to, and assessable against any work, materials, equipment, services, processes and operations incidental to or involved in this contract. CONTRACTOR is responsible for ascertaining and arranging to pay them. The prices established in the contract shall include compensation for any taxes CONTRACTOR is required to pay by laws and regulations in effect at the bid opening date.

15. LICENSES: CONTRACTOR represents and warrants to CITY that it has all licenses, permits, qualifications, insurance, and approvals of whatsoever nature Tuesday, July 07, 2026 Reg CC MTG, Page *171

Page 7 of 10 ends

which are legally required of CONTRACTOR to practice its profession.

CONTRACTOR represents and warrants to CITY that CONTRACTOR shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits, insurance, and approvals which are legally required of CONTRACTOR to practice its profession. CONTRACTOR shall maintain a City of Lomita business license, if required under CITY ordinance.

16. RECORDS: CONTRACTOR shall maintain accounts and records, including personnel, property, and financial records, adequate to identify and account for all costs pertaining to this Agreement and such other records as may be deemed necessary by CITY or any authorized representative, and will be retained for three years after the expiration of this Agreement. All such records shall be made available for inspection or audit by CITY at any time during regular business hours.

17. SEVERABILITY. If any portion of these contract documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect provided that it does not frustrate the mutual intent of the parties herein.

18. WHOLE AGREEMENT: This Agreement supersedes any and all other agreements, either oral or written, between the parties and contains all of the covenants and agreements between the parties pertaining to the work of improvements described herein. Each party to this Agreement acknowledges that no representations, inducements, promises, or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that any other agreement, statements, or promise not contained in this Agreement shall not be valid or binding. Any modification of this Agreement will be effective only if signed by the party to be charged.

19. AUTHORITY: CONTRACTOR affirms that the signatures, titles, and seals set forth hereinafter in execution of this Agreement represent all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest herein. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party. This Agreement may be modified by written amendment. CITY’s City Manager may execute any such amendment on CITY’s behalf.

20. NOTICES: All notices permitted or required under this Agreement shall be in writing, and shall be deemed made when delivered to the applicable party’s representative as provided in this Agreement. Additionally, such notices may be given to the respective parties at the following addresses, or at such other addresses as the parties may provide in writing for this purpose.

Such notices shall be deemed made when personally delivered or when mailed forty-eight (48) hours after deposit in the U.S. mail, first-class postage prepaid, and addressed to the party at its applicable address. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.

Tuesday, July 07, 2026 Reg CC MTG, Page *172

Page 8 of 10 ends

CITY OF LOMITA, CA
24300 NARBONNE AVENUE, LOMITA, CA 90717
PHONE: (310) 325-7110
FAX: (310) 325-4024
EMAIL: [email protected]
Attention: Hector Flores, Public Works Operations Manager and Van Mesa, Water Systems Superintendent
CONTRACTOR:

ED’S FENCING, INC.
1521 E PACIFIC COAST HWY, WILMINGTON, CA 90744
PHONE: (310) 518-3200
EMAIL: [email protected]
Attention: Chase Jones, Project Manager
Tuesday, July 07, 2026 Reg CC MTG, Page *173

Page 9 of 10 ends

21. DISPUTES. Disputes arising from this Agreement will be determined in accordance with the contract documents and Public Contracts Code §§ 10240- 10240.13.

22. NON-DISCRIMINATION: No discrimination shall be made in the employment of persons in the work contemplated by this Agreement because of race, religion, color, medical condition, sex, sexual orientation, national origin, political affiliation or opinion, or pregnancy or pregnancy-related condition. A violation of this section exposes CONTRACTOR to the penalties provided for in Labor Code Section 1735.

23. NO THIRD PARTY BENEFICIARY. This Agreement and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor’s or the City’s obligations under this Contract.

24. TIME IS OF THE ESSENCE. Time is of the essence for each and every provision of the Contract Documents.

25. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

26. GOVERNING LAW: This Agreement shall be governed by the laws of the State of California, and exclusive venue for any action involving this Agreement will be in Los Angeles County.
[signatures on the following page]
Tuesday, July 07, 2026 Reg CC MTG, Page *174

Page 10 of 10 ends

IN WITNESS WHEREOF, the parties hereto have executed this Agreement with all the formalities required by law on the respective dates set forth opposite their signatures.

State of California
CONTRACTOR’S License No. #422002

CONTRACTOR
ED’S FENCING, INC.

By:

DATE TITLE
CONTRACTOR’S Business Phone (949) 337-5004
Emergency Phone at which CONTRACTOR can be reached at any time: (949) 337-5004

CITY OF LOMITA, CALIFORNIA
By:

DATE Andrew Vialpando, CITY MANAGER
ATTEST:

By:

DATE Kathleen Horn Gregory, CITY CLERK

APPROVED AS TO
FORM:

By:

DATE Trevor Rusin, CITY ATTORNEY
Tuesday, July 07, 2026 Reg CC MTG, Page *175
Exhibit A
Tuesday, July 07, 2026 Reg CC MTG, Page *176
Ed’s Fencing, Inc.
1521 E Pacific Coast Hwy, Wilmington, CA 90744
(310) 518-3200 | License #422002
DIR #1000044021
Since 1939
Client: City of Lomita
Date: January 27, 2026
Quote Valid For: 30 Days
Payment Terms: Net 30
This job was bid using prevailing wages.

Scope of Work
- Remove and haul away existing chain link swing gate
- Furnish and install new 8' high x 25' wide iron slide gate with spiked pickets on top - Gate to be motorized and operate on V-track with roller guide - Pour concrete pad for slide gate motor
- Install heavy-duty V-track set in asphalt with concrete footings; V-track to extend approximately 1-1/4" above grade
- V-track designed to support vehicular traffic without damage - Gate to include three (3) heavy-duty 6" chrome V-track wheels - Slide gate to be primed with red oxide rust-preventative primer and painted black - Price does not include running electrical wiring to gate motor location - Slide gate motor to be 24V DC and include photo eye and 5' safety edge - Motor includes a two (2) year manufacturer warranty
Materials to Be Used
- 2" x 14-gauge steel frame
- 1" x 14-gauge steel pickets
- Heavy-duty commercial-grade gate hardware and components Cost Breakdown (Prevailing Wage)
Materials: $11,979.00
Labor: $9,801.00
Total Cost
$21,780.00
Accepted By: _______________________________
Title: ___________________
Date: ___________________
Tuesday, July 07, 2026 Reg CC MTG, Page *177
Terms and Conditions

1. A 50% deposit is due prior to the start of the job. Remaining balance is due upon completion.

2. Start dates are subject to material availability and weather conditions.

3. Client to provide clear access to work area during normal working hours.

4. All materials are new and commercial grade unless otherwise specified.

5. Workmanship is guaranteed for one (1) year from date of installation.

6. Ed’s Fencing, Inc. is not responsible for unmarked underground utilities.

7. Any changes to scope require a written and signed change order.

8. Pricing is valid for 30 days from date of quote.

Tuesday, July 07, 2026 Reg CC MTG, Page *178
ED'S FENCING, INC.

California License No. 422002
1521 East Pacific Coast Highway, Wilmington, CA 90744
Date: April 27, 2026
Client: Van City of Lomita
Address: 26112 Cypress Street, Lomita, CA
Scope of Work
- Remove and re-install 25’ x 8’ high existing wrought iron fencing, offset 12” from water pipes. - Install approximately 50’ x 8” concrete mow-strip.
- Install V-track into new concrete footing.
- Fabricate and install (1) 25’ x 8’ high wrought iron slide gate. - Install roller guide system.
- Install new 3” posts.
- Re-use and re-install existing wrought iron panels to new fence line.

Important Notes
- Approximately 25’ of existing panels to be re-used.
- Existing fittings to be re-used.

Materials to be Used
- V-track
- 3" .0140 wall square wrought iron posts
- Roller-guide wheels
- Roller-guide
- V-track wheels
- 4500 PSI concrete
Total Contract Price
$23,428.00
All material and labor included.

Prevailing wage applies.

Tuesday, July 07, 2026 Reg CC MTG, Page *179
Acceptance
Client Signature: __________________________ Date: __________ Ed’s Fencing Representative: __________________________ Date: __________ Disclaimer
Ed’s Fencing, Inc. shall not be responsible for delays due to weather conditions, restricted access, site logistics, labor availability, material shortages, inspection delays, utility conflicts, or any circumstances beyond contractor control. This project includes the removal and reuse of existing wrought iron panels and fittings. Client acknowledges that reused materials may contain hidden defects including but not limited to corrosion, fatigue, misalignment, cracking, or prior structural damage. Contractor is not responsible for the structural integrity, performance, or longevity of reused materials. Work performed near existing underground or above-ground utilities, including water lines, requires reliance on provided or visible locations. Contractor is not responsible for damage to unmarked, improperly marked, or unknown utilities. Any repairs required due to unforeseen utility conflicts will be addressed through change order. Concrete installations including mow-strip and V-track footings assume suitable subgrade conditions. Contractor is not responsible for cracking, settling, or failure due to soil conditions, existing slab conditions, or environmental factors. Sliding gate systems require ongoing maintenance and proper use. Contractor is not responsible for track obstruction, debris accumulation, impact damage, or long-term wear affecting gate operation. All measurements are approximate and subject to field verification. Adjustments in layout, alignment, or quantities may occur due to site conditions.

Prevailing wage work is subject to compliance with applicable DIR requirements. Any changes in classification, scope, or labor requirements may result in price adjustments through written change order. All work will be completed per industry standards; however, minor variations in alignment, finish, and installation may occur due to field conditions and tolerances. Payment is due per agreed terms.

Failure to make payment may result in suspension of work and additional charges. Contractor reserves the right to file a mechanic’s lien in accordance with California law for unpaid balances.

Tuesday, July 07, 2026 Reg CC MTG, Page *180
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Deanna Fraley, PE, Public Works Director
MEETING DATE: July 7, 2026
SUBJECT: Professional Services Agreement with Ron’s Maintenance Inc. for Fiscal Year 2026-27 Catch Basin Cleaning Services

RECOMMENDED ACTION
Approve a Professional Services Agreement with Ron’s Maintenance Inc. for Fiscal Year 2026-27 catch basin cleaning services for an amount not to exceed $50,400; and appropriate an additional $29,400 from the Special Revenue Fund (Gas Tax).

BACKGROUND
The Public Works Department is responsible for maintaining the City of Lomita’s stormwater drainage system to ensure the safe and efficient conveyance of stormwater runoff during rain events. While the Los Angeles County Flood Control District (LACFCD) owns and maintains the majority of the regional storm drain infrastructure, the City is responsible for the annual maintenance of 210 catch basins throughout Lomita.

Under the City’s maintenance agreement with LACFCD, the City is responsible for cleaning 36 City-owned catch basins, as well as 174 LACFCD-owned catch basins that have been retrofitted with City-installed trash excluders. The trash excluders are designed to capture litter and debris before it enters the regional storm drain system, which helps the City comply with stormwater quality requirements and reduce pollutant discharges to local waterways.

DISCUSSION
For Fiscal Year 2025-26, catch basin cleaning services were provided by Los Angeles County Public Works. For Fiscal Year 2026-27, the County provided an estimated cost of $65,160 to clean all catch basins three times during the wet season and one time during the dry season. The proposed services include cleaning and

CITY OF LOMITA

CITY COUNCIL REPORT
Item No.
7i
Tuesday, July 07, 2026 Reg CC MTG, Page *181
2 removing all sediment from the catch basins and replacement of “No-Dumping” stencils, as needed. Repairs to any trash excluders will be an additional cost.

Staff also evaluated completing this work with City staff. Based on labor, equipment rentals, and operational costs, staff estimates it would cost approximately $54,647 to clean all 210 catch basins once, making in-house performance substantially more expensive while also diverting maintenance crews from other essential Public Works operations.

To identify a more cost-effective alternative, staff solicited a proposal from Ron’s Maintenance Inc., a firm specializing in storm drain maintenance services. Ron’s Maintenance submitted a proposal in the amount of $42,000 to clean all catch basins three times during the wet season and one time during the dry season.

The proposed services include the removal of all sediment, vegetation, litter, and debris using vacuum and pressure-washing equipment. The contractor will also provide photographs and inspection reports documenting completion of work at each catch basin.

Based on the competitive pricing, it is recommended that the City enter into a Professional Services Agreement with Ron’s Maintenance Inc. and establishing a contingency of $8,400 to address additional work that may be required during the cleaning process, including replacement of “No Dumping” stencils and repairs to trash excluders identified during inspections for a total contract amount not to exceed $50,400.

FISCAL IMPACT
The Fiscal Year budget currently includes $21,000 appropriated from the Special Revenue Fund (Gas Tax). An additional appropriation of $29,400 is required to fund the services.

VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 5: City Infrastructure & Water Utility – Investing in reliable, sustainable infrastructure.

OPTIONS

1. Approve staff’s recommendation.

2. Provide alternative direction.

Tuesday, July 07, 2026 Reg CC MTG, Page *182
3 ATTACHMENTS

1. Professional Services Agreement with Ron’s Maintenance Inc.

2. Ron’s Maintenance Inc. Proposal
Prepared by: Approved by:
_______________________ ______________________
Deanna Fraley, PE Andrew Vialpando
Public Works Director City Manager
Tuesday, July 07, 2026 Reg CC MTG, Page *183

CONTRACT FOR PROFESSIONAL SERVICES

BETWEEN
THE CITY OF LOMITA AND RON’S MAINTENANCE INC.

Page 1 of 13 ends

This AGREEMENT for Annual Catch Basin Cleaning Services is entered into this 7th day of July, 2026, by and between the CITY OF LOMITA, a general law city and municipal corporation (“CITY”) and Ron’s Maintenance, Inc., a California corporation (“CONTRACTOR”).

R E C I T A L S
A. CITY does not have the personnel able and/or available to perform the services required under this agreement.

B. Therefore, CITY desires to contract out for Annual Catch Basin Cleaning Services.

C. CONTRACTOR warrants to CITY that it has the qualifications, experience and facilities to perform properly and timely the services under this Agreement.

D. CITY desires to contract with CONTRACTOR to perform the services as described in Exhibit A of this Agreement.

NOW, THEREFORE, based on the foregoing recitals, CITY and CONTRACTOR agree as follows:

1. CONSIDERATION AND COMPENSATION.

A. As partial consideration, CONTRACTOR agrees to perform the work listed in the SCOPE OF SERVICES, attached as Exhibit A;
B. As additional consideration, CONTRACTOR and CITY agree to abide by the terms and conditions contained in this Agreement;
C. As additional consideration, CITY agrees to pay CONTRACTOR for its services satisfactory and reasonably rendered in an amount not to exceed $42,000.00, computed at a rate of $50.00 per catch basin, as set forth in the SCOPE OF Services and attached as Exhibit A, unless otherwise specified by written amendment to this Agreement. The City Council has also approved an additional 20% of these estimated costs, or up to $8,400.00, for unexpected contingencies, or a total, not-to-exceed amount of $50,400.00. If CONTRACTOR incurs expenses exceeding the proposed cost of $42,000.00, the CONTRACTOR must request such expenses in writing, and the CITY’s City Manager or his designee must approve of Tuesday, July 07, 2026 Reg CC MTG, Page *184

Page 2 of 13 ends

such requests, for CONTRACTOR to receive compensation for those costs.

D. No additional compensation shall be paid for any other expenses incurred, unless first approved by the City Manager or his designee.

E. CONTRACTOR shall submit to CITY, by not later than the 10th day of each month, its bill for services itemizing the fees and costs incurred during the previous month. CITY shall pay CONTRACTOR all uncontested amounts set forth in the CONTRACTOR'S bill within 30 days after it is received.

2. SCOPE OF SERVICES.

A. CONTRACTOR will perform the services and activities set forth in the SCOPE OF SERVICES attached hereto as Exhibit A and incorporated herein by this reference.

If any part of Exhibit A is inconsistent with the terms of this Agreement, the terms of this Agreement shall control.

B. Except as herein otherwise expressly specified to be furnished by CITY, CONTRACTOR will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space, and facilities necessary or proper to perform and complete the work and provide the professional services required of CONTRACTOR by this Agreement.

3. PAYMENTS. For CITY to pay CONTRACTOR as specified by this Agreement, CONTRACTOR must submit an invoice to CITY which lists the reimbursable costs, the specific tasks performed, and, for work that includes deliverables, the percentage of the task completed during the billing period.

4. TIME OF PERFORMANCE. The services of CONTRACTOR are to commence upon receipt of a notice to proceed from CITY and shall continue until all authorized work is completed to CITY’s reasonable satisfaction, in accordance with the schedule incorporated in “Exhibit A,” unless extended in writing by CITY.

5. FAMILIARITY WITH WORK. By executing this Agreement, CONTRACTOR represents that CONTRACTOR has (a) thoroughly investigated and considered the scope of services to be performed; (b) carefully considered how the services should be performed; and (c) understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.

6. KEY PERSONNEL. CONTRACTOR’s key person assigned to perform work under this Agreement is Ron Norman. CONTRACTOR shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of CITY.

7. TERM OF AGREEMENT. The term of this Agreement shall commence upon execution by both parties and shall expire on June 30, 2027, unless earlier termination Tuesday, July 07, 2026 Reg CC MTG, Page *185

Page 3 of 13 ends

occurs under Section 13 of this Agreement, or extended in writing in advance by both parties.

2. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONTRACTOR and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.

3. TAXPAYER IDENTIFICATION NUMBER. CONTRACTOR will provide CITY with a Taxpayer Identification Number.

4. PERMITS AND LICENSES. CONTRACTOR will obtain and maintain during the term of this Agreement all permits, licenses, and certificates that may be required by local, state and federal laws in connection with the performance of services under this Agreement, including a business license as specified in Title VI, Chapter 2 of the Lomita Municipal Code.

5. LAWS AND REGULATIONS; EMPLOYEE/LABOR CERTIFICATION.

CONTRACTOR shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. CONTRACTOR shall be liable for all violations of such laws and regulations in connection with the Services and this Agreement. All violations of such laws and regulations shall be grounds for CITY to terminate the Agreement for cause

6. PREVAILING WAGE.

A. Prevailing Wage. CONTRACTOR is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, CONTRACTOR agrees to fully comply with such Prevailing Wage Laws.

Upon request, CITY shall provide CONTRACTOR with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

CONTRACTOR shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the CONTRACTOR’S principal place of business and at the project site. It is the intent of the parties to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 of the Labor Code within this Agreement, and CONTRACTOR shall therefore comply with such Labor Code sections to the fullest extent required by law.

CONTRACTOR shall defend, indemnify and hold the CITY, its officials, officers, Tuesday, July 07, 2026 Reg CC MTG, Page *186

Page 4 of 13 ends

employees, agents, and volunteers free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

B. Registration/DIR Compliance. If the services are being performed on a public works project of over $25,000 when the project is for construction, alteration, demolition, installation, or repair work, or a public works project of over $15,000 when the project is for maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, CONTRACTOR and all subcontractors must be registered with the Department of Industrial Relations (“DIR”). CONTRACTOR shall maintain registration for the duration of the project and require the same of any subcontractors. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be CONTRACTOR’S sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Any stop orders issued by the DIR against CONTRACTOR or any subcontractors that affect CONTRACTOR’S performance of services, including any delay, shall be CONTRACTOR’S sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONTRACTOR caused delay and shall not be compensable by CITY.

CONTRACTOR shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONTRACTOR or any subcontractor.

C. Labor Certification. By its signature hereunder, CONTRACTOR certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

D. Employment of Apprentices. CONTRACTOR and all subcontractors shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

E. CONTRACTOR or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between CONTRACTOR and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid or may have been paid to a debarred subcontractor by CONTRACTOR on the project shall be returned to CITY. CONTRACTOR shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

Tuesday, July 07, 2026 Reg CC MTG, Page *187

Page 5 of 13 ends

F. CONTRACTOR agrees to bind every subcontractor to the terms of the Agreement as far as such terms are applicable to subcontractor’s portion of the work.

CONTRACTOR shall be as fully responsible to CITY for the acts and omissions of its subcontractor and of persons either directly or indirectly employed by its subcontractor, as CONTRACTOR is for acts and omissions of persons directly employed by CONTRACTOR. Nothing contained in these Agreement shall create any contractual relationship between any subcontractor and CITY.

7. TERMINATION.

A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination shall be in writing.

B. CONTRACTOR may terminate this Agreement. Notice will be in writing at least 30 days before the effective termination date.

C. In the event of such termination, CONTRACTOR shall cease services as of the date of termination, all finished or unfinished documents, data, drawings, maps, and other materials prepared by CONTRACTOR shall, at CITY’s option, become CITY’s property, and CONTRACTOR will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination.

D. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.

8. INDEMNIFICATION.

A. CONTRACTOR shall indemnify, defend with counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT, regardless of CITY’S passive negligence, but excepting such loss or damage which is caused by the sole active negligence or willful misconduct of CITY. Should CITY in its sole discretion find CONTRACTOR’S legal counsel unacceptable, then CONTRACTOR shall reimburse CITY its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation.

CONTRACTOR shall promptly pay any final judgment rendered against CITY (and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

B. The requirements as to the types and limits of insurance coverage to be maintained by CONTRACTOR as required by Section 19, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or Tuesday, July 07, 2026 Reg CC MTG, Page *188

Page 6 of 13 ends

qualify the liabilities and obligations otherwise assumed by CONTRACTOR pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.

9. ASSIGNABILITY. This Agreement is for CONTRACTOR’s professional services.

CONTRACTOR’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.

10. INDEPENDENT CONTRACTOR. CITY and CONTRACTOR agree that CONTRACTOR will act as an independent contractor and will have control of all work and the manner in which is it performed. CONTRACTOR will be free to contract for similar service to be performed for other employers while under contract with CITY. CONTRACTOR is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONTRACTOR as to the details of doing the work or to exercise a measure of control over the work means that CONTRACTOR will follow the direction of the CITY as to end results of the work only.

11. AUDIT OF RECORDS.

A. CONTRACTOR agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement.

CONTRACTOR agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement.

CONTRACTOR further agrees to maintain such records for a period of three (3) years following final payment under this Agreement.

B. CONTRACTOR will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Agreement.

12. CORRECTIVE MEASURES. CONTRACTOR will promptly implement any corrective measures required by CITY regarding the requirements and obligations of this Agreement. CONTRACTOR will be given a reasonable amount of time as determined by CITY to implement said corrective measures. Failure of CONTRACTOR to implement required corrective measures shall result in immediate termination of this Agreement.

13. INSURANCE REQUIREMENTS.

A. CONTRACTOR, at CONTRACTOR’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies:

Tuesday, July 07, 2026 Reg CC MTG, Page *189

Page 7 of 13 ends

1. Workers Compensation Insurance as required by law. CONTRACTOR shall require all subcontractors similarly to provide such compensation insurance for their respective employees. Any notice of cancellation or non-renewal of all Workers’ Compensation policies must be received by CITY at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against CITY, its officers, agents, employees, and volunteers for losses arising from work performed by CONTRACTOR for CITY.

2. General Liability Coverage. CONTRACTOR shall maintain commercial general liability insurance in an amount of not less than two million dollars ($2,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.

3. Automobile Liability Coverage. CONTRACTOR shall maintain automobile liability insurance covering bodily injury and property damage for all activities of CONTRACTOR arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired, and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.

4. Professional Liability Coverage. CONTRACTOR shall maintain professional errors and omissions liability insurance for protection against claims alleging negligent acts, errors, or omissions which may arise from CONTRACTOR’S operations under this Agreement, whether such operations be by CONTRACTOR or by its employees, subcontractors, or subcontractors. The amount of this insurance shall not be less than two million dollars ($2,000,000) on a claims-made annual aggregate basis, or a combined single-limit-per-occurrence basis. When coverage is provided on a “claims made basis,” CONTRACTOR will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated.

Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONTRACTOR for all claims made by CITY arising out of any errors or omissions of CONTRACTOR, or its officers, employees or agents during the time this Agreement was in effect.

B. Endorsements. Each general liability, automobile liability and professional liability insurance policy shall be issued by a financially responsible insurance company or companies admitted and authorized to do business in the State of California, or which is approved in writing by CITY, and shall be endorsed as follows. CONTRACTOR also agrees to require all contractors, and subcontractors to do likewise.

1. “The CITY, its elected or appointed officers, officials, employees, agents, Tuesday, July 07, 2026 Reg CC MTG, Page *190

Page 8 of 13 ends

and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the CONTRACTOR, including materials, parts, or equipment furnished in connection with such work or operations.”

2. This policy shall be considered primary insurance as respects CITY, its elected or appointed officers, officials, employees, agents, and volunteers.

Any insurance maintained by CITY, including any self-insured retention CITY may have, shall be considered excess insurance only and shall not contribute with this policy.

3. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.

4. The insurer waives all rights of subrogation against CITY, its elected or appointed officers, officials, employees, or agents.

5. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to CITY, its elected or appointed officers, officials, employees, agents, or volunteers.

6. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days’ written notice has been received by CITY.

C. CONTRACTOR agrees to provide immediate notice to CITY of any claim or loss against Contractor arising out of the work performed under this agreement.

CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.

D. Any deductibles or self-insured retentions must be declared to and approved by CITY. At CITY’s option, CONTRACTOR shall demonstrate financial capability for payment of such deductibles or self-insured retentions.

E. CONTRACTOR shall provide certificates of insurance with original endorsements to CITY as evidence of the insurance coverage required herein.

Certificates of such insurance shall be filed with CITY on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with CITY at all times during the term of this Agreement.

F. Failure on the part of CONTRACTOR to procure or maintain required insurance shall constitute a material breach of contract under which CITY may terminate this Agreement pursuant to Section 13 above.

G. The commercial general and automobile liability policies required by this Tuesday, July 07, 2026 Reg CC MTG, Page *191

Page 9 of 13 ends

Agreement shall allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and/or deductible of the policy in lieu of the CONTRACTOR (as the named insured) should CONTRACTOR fail to pay the SIR or deductible requirements. The amount of the SIR or deductible shall be subject to the approval of the City Attorney and the Finance Director. CONTRACTOR understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONTRACTOR as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CONTRACTOR’S behalf upon CONTRACTOR’S failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against Contractor for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.

14. USE OF OTHER CONTRACTORS. CONTRACTOR must obtain CITY’s prior written approval to use any Contractors while performing any portion of this Agreement. Such approval must include approval of the proposed Contractor and the terms of compensation.

15. FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by the CONTRACTOR of the final payment made under this Agreement shall operate as and be a release of CITY from all claims and liabilities for compensation to the CONTRACTOR for anything done, furnished or relating to the CONTRACTOR’S work or services. Acceptance of payment shall be any negotiation of CITY’S check or the failure to make a written extra compensation claim within ten (10) calendar days of the receipt of that check. However, approval or payment by CITY shall not constitute, nor be deemed, a release of the responsibility and liability of CONTRACTOR, its employees, sub-Contractors and agents for the accuracy and competency of the information provided and/or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by CITY for any defect or error in the work prepared by CONTRACTOR, its employees, sub-Contractors and agents.

16. CORRECTIONS. In addition to the above indemnification obligations, the CONTRACTOR shall correct, at its expense, all errors in the work which may be disclosed during CITY’S review of CONTRACTOR’S report or plans. Should the CONTRACTOR fail to make such correction in a reasonably timely manner, such correction shall be made by CITY, and the cost thereof shall be charged to CONTRACTOR. In addition to all other available remedies, CITY may deduct the cost of such correction from any retention amount held by CITY or may withhold payment otherwise owed CONTRACTOR under this Agreement up to the amount of the cost of correction.

17. NON-APPROPRIATION OF FUNDS. Payments to be made to CONTRACTOR by CITY for services preformed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that CITY does not appropriate sufficient funds for payment of CONTRACTOR’S services Tuesday, July 07, 2026 Reg CC MTG, Page *192

Page 10 of 13 ends

beyond the current fiscal year, the Agreement shall cover payment for CONTRACTOR’S only to the conclusion of the last fiscal year in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.

24. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

CITY CONTRACTOR
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
ATTN: City Manager
Ron’s Maintenance Inc.

P.O. Box 4562
Downey, CA 90241
ATTN: President
Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.

25. SOLICITATION. CONTRACTOR maintains and warrants that it has not employed nor retained any company or person, other than CONTRACTOR’s bona fide employee, to solicit or secure this Agreement. Further, CONTRACTOR warrants that it has not paid nor has it agreed to pay any company or person, other than CONTRACTOR’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONTRACTOR breach or violate this warranty, CITY may rescind this Agreement without liability.

26. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONTRACTOR and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONTRACTOR’s or CITY’s obligations under this Agreement.

27. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.

28. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written.

Tuesday, July 07, 2026 Reg CC MTG, Page *193

Page 11 of 13 ends

29. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.

30. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment with signatures of all parties to this Agreement. CITY’s city administrator, or designee, may execute any such amendment on behalf of CITY.

31. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

32. FORCE MAJEURE. Should performance of this Agreement be impossible due to fire, flood, explosion, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ control, then the Agreement will immediately terminate without obligation of either party to the other.

33. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided.

34. ATTORNEY’S FEES. The parties hereto acknowledge and agree that each will bear his or its own costs, expenses and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled.

35. STATEMENT OF EXPERIENCE. By executing this Agreement, CONTRACTOR represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY.

CONTRACTOR represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private Contractors, and experience in dealing with public agencies all suggest that CONTRACTOR is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency.

36. DISCLOSURE REQUIRED. (CITY and CONTRACTOR initials required at one of the following paragraphs)
Tuesday, July 07, 2026 Reg CC MTG, Page *194

Page 12 of 13 ends

By their respective initials next to this paragraph, CITY and CONTRACTOR hereby acknowledge that CONTRACTOR is a “contractor” for the purposes of the California Political Reform Act because CONTRACTOR’S duties would require him or her to make one or more of the governmental decisions set forth in Fair Political Practices Commission Regulation 18700.3(a)(2) or otherwise serves in a staff capacity for which disclosure would otherwise be required were CONTRACTOR employed by CITY. CONTRACTOR hereby acknowledges his or her assumingoffice, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the CITY’S Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to Contractor commencing services hereunder, the City’s Manager shall prepare and deliver to CONTRACTOR a memorandum detailing the extent of CONTRACTOR’S disclosure obligations in accordance with the CITY’S Conflict of Interest Code.

City Initials ______
Contractor Initials ______
OR
By their initials next to this paragraph, CITY and CONTRACTOR hereby acknowledge that CONTRACTOR is not a “contractor” for the purpose of the California Political Reform Act because CONTRACTOR’S duties and responsibilities are not within the scope of the definition of contractor in Fair Political Practice Commission Regulation 18700.3(a)(2) and is otherwise not serving in staff capacity in accordance with CITY’S Conflict of Interest Code.

City Initials ______
Contractor Initials ______
[signatures on following page]
Tuesday, July 07, 2026 Reg CC MTG, Page *195

Page 13 of 13 ends

IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.

CITY OF LOMITA CONTRACTOR
Andrew Vialpando, City Manager By: Ron Norman, President ATTEST:

Kathleen Horn Gregory, City
Clerk
Taxpayer ID No.

APPROVED AS TO FORM:

City Attorney
Tuesday, July 07, 2026 Reg CC MTG, Page *196
RMI

CATCH BASIN AND STORM DRAIN MAINTENANCE

SERVICES
April 27, 2026
Rachel Bucklew
Water Quality & Environmental Specialist
Public Works Department
City of Lomita
Sent via email to: [email protected]
Re: Annual Catch Basin Cleaning Services for the City of Lomita Dear Ms. Bucklew;
Ron’s Maintenance Inc. (RMI) has received your request for pricing annual catch basin cleaning services for the City’s 210 catch basins. RMI will supply all tools, equipment, and materials needed to clean the City’s catch basins 1 time in the Dry Season and 3 times in the Wet Season for a total of 4 times per year. Services will be completed at a cost of $50.00/catch basin, for a total annual price of $42,000.

Please feel free to contact me directly at (213) 359-3827 should you have any questions or need additional information.

Sincerely,
Ron Norman,
President
Exhibit A
Tuesday, July 07, 2026 Reg CC MTG, Page *197
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Susan Kamada, Deputy City Manager/Administrative Services Director
MEETING DATE: July 7, 2026
SUBJECT: Human Resources Technician Job Classification

RECOMMENDATION
Approve the Human Resources Technician Position Specifications.

BACKGROUND
A system of position classification creates an understanding of the roles, responsibilities, and relationships of each job classification within the City. Classification descriptions identify the essential duties, responsibilities, level of authority, knowledge, skills, education, experience, and certifications required to meet the minimum performance standards for each position at the City.

The City Council is responsible for adopting the position classifications and authorizing the number of City positions through Resolutions. As the City’s Personnel Officer, the City Manager, or designee, is responsible for ensuring that accurate class descriptions exist for all positions. From time to time, creations and changes to position classification specifications are needed as the City Manager determines necessary to accomplish the City’s mission, purpose, and programs.

The City Manager recommends that a new position classification titled Human Resources Technician be created to meet the operational needs of the City.

DISCUSSION
The Human Resources Technician is an entry-level administrative support position that focuses on the day-to-day operations of the Human Resources division. The HR Technician position is a confidential, non-represented classification in the Human Resources series.

Item No.

CITY OF LOMITA

CITY COUNCIL REPORT
Tuesday, July 07, 2026 Reg CC MTG, Page *198
2 Establishing the Human Resources Technician classification will strengthen the City's human resources operations by providing dedicated technical support for essential personnel functions, improving efficiency, and allowing professional staff to focus on strategic and complex human resources responsibilities. Approval of the proposed classification will enhance service delivery while supporting the City's workforce and organizational goals.

If approved, the recommended action only approves the newly created job specifications detailed in the HR Technical Job Classification (Attachment). Staff is not recommending that an additional full-time equivalent (FTE) be added to the Full-Time position listing at this time, meaning that no budget amendment is being requested and the number of fulltime employees will not change.

VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 6: High Performing Organization – Strengthening City services through innovation and excellence.

Options:

1. Approve staff’s recommendation.

2. Give staff alternative direction.

FISCAL IMPACT
If approved, the recommended action only approves the newly created job specifications detailed in the HR Technical Job Classification (Attachment). Staff is not recommending that an additional full-time equivalent (FTE) be added to the Full-Time position listing at this time, meaning that no budget amendment is being requested and the number of fulltime employees will not change.

ATTACHMENTS
1) Human Resources Technician Job Classification
Approved by:

Andrew Vialpando
City Manager
Tuesday, July 07, 2026 Reg CC MTG, Page *199
3 Prepared by:
__________________________
Susan Kamada
Deputy City Manager/Administrative Services Director
Tuesday, July 07, 2026 Reg CC MTG, Page *200
July 2026
FLSA: Non-Exempt

HUMAN RESOURCES TECHNICIAN

DEFINITION
Under general supervision, performs a variety of responsible technical and administrative work in support of the City’s Human Resources and Risk Management programs, including recruitment and selection, onboarding, employee benefits enrollment, leave administration, personnel records maintenance, training and development, and other related duties as assigned requiring confidentiality.

SUPERVISION RECEIVED AND EXERCISED
Receives general direction from the Human Resources Manager. Exercises no direct supervision over staff.

CLASS CHARACTERISTICS
This is an entry-level administrative support position that focuses on the day-to-day operations of the Human Resources division. The HR Technician position is a confidential, non-represented classification in the Human Resources series responsible for performing assigned work. Incumbents regularly work on tasks which are varied and require considerable discretion and independent judgment. Assignments are given with general guidelines, and incumbents are expected to complete their work with limited supervision.

Incumbents are expected to demonstrate a complete understanding of all applicable policies, procedures, statutory and legal requirements, and work methods associated with assigned duties. Work is typically reviewed upon completion for soundness, appropriateness, and conformity to policy and requirements.

EXAMPLES OF TYPICAL JOB FUNCTIONS (Illustrative Only)
Management reserves the right to add, modify, change, or rescind the work assignments of different positions and to make reasonable accommodations where appropriate so qualified employees can perform the essential functions of the job.
➢ Provides professional and technical staff support: provide outstanding internal and external customer service by phone and in-person, provide clerical support for the Human Resources division; processes and distribute mail, order and stocks supplies, schedule in-person and virtual meetings, file, copy, scan, maintain paper and electronic files, prepare memos, announcements, flyers, and other documents using Microsoft Office, graphic design software (Canva), AI, etc., issue ID badges and access cards, and coordinate IT access.
➢ Maintains various logs and databases utilizing spreadsheets and databases; compiles information and prepares data and reports related to departmental functions. ➢ Assists with recruitment and selection activities including: Creating job announcements and advertisements, answering inquiries regarding vacancies and requirements for employment, screens applications, schedules candidates for interviews, proctors and scores exams, coordinates oral boards, assembling test materials and rater packets, and informs hiring department of status of processes; assists with employee interviewing and selection, update candidate status in applicant tracking system, generate status notices to candidates, inform candidates and departments of final hiring decisions. ➢ Coordinates offer letters, pre-employment physicals, livescans, reference checks, I-9 documentation, and onboarding.

Tuesday, July 07, 2026 Reg CC MTG, Page *201
Human Resources Technician

Page 2 of 4 ends

➢ Provides assistance in tracking Workers’ Compensation claims; ensures that accident, injury, and illness incidents have been properly documented and reported in accordance with statutory requirements and risk management policies; maintains Workers’ Compensation files and posts annual OSHA incident logs.
➢ Assists with risk management; claim intake, correspond with JPIA, insurance companies, appraisers, attorneys, third parties, and complainants, track claims, maintain claim files, and follow-up as needed. ➢ Assists with coordination of City-wide training programs, education reimbursement programs, wellness reimbursement, service awards, commendations, and special events; coordinates employee activity committee meetings and action items.
➢ Explains city policies, rules, and procedures; maintains and updates personnel records in accordance with records management retention and planned destruction practices. ➢ Provides administrative support for department director and Human Resources Manager, researches and prepares salary and benefits survey data, maintain personnel, medical, benefits, and workers compensations records, and production of reports.
➢ Processes personnel action forms in HRIS for employee status changes on appointments, assignments, transfers, leaves of absences, dismissals, resignations and other personnel information, and implements personnel status changes resulting from new labor agreements. ➢ Prepares orientation packets and conducts orientation for new hires, explains benefit plans and City policies as part of open enrollment; enters, collects, and verifies enrollment form data for enrollment and reporting purposes; assists employees with health insurance enrollment, network coverage, and interim eligibility questions, schedules and coordinates benefit meetings, clinics, and other functions. ➢ Prepares exit documents for terminating and retiring employees including communicating healthcare coverage and rates and collecting city property; Administers Consolidated Omnibus Budget and Reconciliation Act (COBRA) health insurance notifications and enrollment changes for former employees, spouses, and dependents.
➢ Coordinates and monitors employees on paid and unpaid leave programs, including Family and Medical Leave Act (FMLA), California Family Rights Act (CFRA), and other leaves of absence; ensures that proper medical clearances are received for employees returning to work; monitors employee benefit eligibility under the Affordable Care Act (ACA) provisions. ➢ Assists eligible employees with short-term and long-term disability insurance and life insurance claims; sends claim forms to employees, provides employer information, and ensures that claims are paid correctly by reviewing correspondence received from insurance carrier. ➢ Assists departments and employees by providing policy, procedure, and payroll information according to personnel rules, MOUs, and FLSA guidelines.
➢ Assist in the coordination of open enrollment and benefits fair by sending out notifications, conducting open enrollment meetings, explaining requirements and changes, and collecting and checking records for completeness and accuracy. Assists in the coordination of open enrollment and health fair. ➢ Researches and responds to requests for general and specific information from the public, other departments and outside agencies; interprets and applies memorandums of understanding, city policies, procedures, rules and regulations.
➢ Organizes and maintains office records, statistics, and activity reports; creates and updates software databases; updates applicant tracking systems for recruitment, onboarding and performance evaluations; maintains and updates distribution lists; serves as records liaison for the Human Resources division.

Tuesday, July 07, 2026 Reg CC MTG, Page *202
Human Resources Technician

Page 3 of 4 ends

➢ Designated as responsible party to request information from the Department of Justice on criminal history information for background checks and from medical clinic regarding employee medical status reports.
➢ Performs other duties as assigned.

QUALIFICATIONS
Knowledge of:
➢ Confidentiality, compliance, security, and privacy protocols; ➢ Basic principles and practices of personnel processes, including record keeping, terminology, and accuracy;
➢ Benefits, classification and compensation, and employee relations; ➢ City personnel rules and Memorandum of Understanding (MOU); ➢ Federal and state regulations including, but not limited to California Labor Code; ➢ Public Employees Retirement Law and Fair Labor Standards Act; ➢ Federal and state employee leaves including workers compensation; ➢ Americans with Disability Act (ADA); Family Medical Leave Act (FMLA) and CFRA ➢ Operations, procedures, policies, and precedents of the City; ➢ Records management methods and practices;
➢ Customer service and customer relations practices and principles; ➢ English usage, spelling, vocabulary, grammar, and punctuation; ➢ Modern equipment and communication tools used for business functions and program, project, and task coordination, including computers and software programs relevant to work performed; ➢ Microsoft Office; advanced skill specifically in Word and Excel and Canva ➢ Safe work methods and safety regulations.

Ability to:
➢ Maintain confidentiality
➢ Provide professional human resources services independently in the absence of supervision; ➢ Understand, interpret and apply human resources theory, applicable policies, procedures, laws, and regulations;
➢ Identify and respond to employee inquiries, complaints, concerns and needs; ➢ Conduct salary, benefit and classification surveys and prepare reports; ➢ Implement recruitment and training programs; Maintain accurate and complete employee records; ➢ Assist with risk management claims
➢ To exercise diplomacy, tact and good judgment in dealing with confidential records related to employee personnel and payroll records.
➢ Perform basic mathematical calculations related to employee compensation ➢ Communicate clearly and concisely, both orally and in writing; ➢ Establish and maintain effective working relationships with all levels of management, employees, the public and others encountered in the course of work
➢ Organize and prioritize a variety of projects and multiple tasks in an effective and timely manner; organize own work, set priorities, and meet critical deadlines. ➢ Operate a variety of modern office equipment including computers and applicable software at an intermediate to advanced level; Adapt to changing technologies and learn functionality of new equipment and systems;
➢ Use English effectively to communicate in person, over the telephone, and in writing. ➢ Work independently and on project teams.

Tuesday, July 07, 2026 Reg CC MTG, Page *203
Human Resources Technician

Page 4 of 4 ends

Education and Experience:

Any combination of training and experience that would provide the required knowledge, skills, and abilities is qualifying. A typical way to obtain the required qualifications would be:

Education:
➢ Equivalent to an Associate (AA) degree from an accredited college or university with major coursework in public administration, business administration, human resources management, or a related field.

Experience:
➢ One (1) year of responsible clerical or administrative experience, preferably in human resources and/or a public sector agency, is required.

Licenses and Certifications:
➢ Possession of a valid California Class “C” Driver’s License, to be maintained throughout employment.

PHYSICAL DEMANDS
Must possess mobility to work in a standard office setting and use standard office equipment, including a computer; to operate a motor vehicle and visit various City sites; vision to read printed materials and a computer screen; and hearing and speech to communicate in person and over the telephone. This is primarily a sedentary office classification although standing in work areas and walking between work areas may be required. Finger dexterity is needed to access, enter, and retrieve data using a computer keyboard or calculator and to operate standard office equipment. Positions in this classification occasionally bend, stoop, kneel, reach, push, and pull drawers open and closed to retrieve and file information. Employees must possess the ability to lift, carry, push, and pull materials and objects up to 25 pounds.

ENVIRONMENTAL CONDITIONS
Employees work in an office environment with moderate noise levels, controlled temperature conditions, and no direct exposure to hazardous physical substances. Employees may interact with upset staff and/or public and private representatives in interpreting and enforcing departmental policies and procedures.

CONFIDENTIAL POSITION
This position is designated as a "Confidential" position pursuant to the provisions of the Meyers-MiliasBrown Act.

Tuesday, July 07, 2026 Reg CC MTG, Page *204
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Adrian Fernandez, Community and Economic Development Director
MEETING DATE: July 7, 2026
SUBJECT: Cooperation Agreement Between the City of Lomita and the County of Los Angeles for Continued Participation in the County of Los Angeles Urban Community Development Block Grant Program

RECOMMENDED ACTION
Adopt a resolution authorizing the Mayor or designee to execute the agreement for the time period of July 1, 2027, through June 30, 2030.

BACKGROUND
In 1974, the U.S. Congress introduced the Community Development Block Grant (CDBG) Program as part of the Housing and Community Development Act. CDBG is funded by the U.S. Department of Housing and Urban Development (HUD). Although the Act has been amended in recent years, the primary objective continues to develop viable urban communities by providing decent housing, a suitable living environment, and expanding economic opportunities, principally for low- and moderate-income persons.

The Los Angeles County Development Authority (LACDA), formerly the Los Angeles County Community Development Commission, administers this funding on behalf of the Los Angeles County Board of Supervisors, which oversees the LACDA, and 48 participating cities throughout the County including Lomita. LACDA acts as the intermediary between the Housing and Urban Department (HUD) and the City in the distribution of CDBG funds.

To participate in the CDBG Program, LACDA must requalify with HUD every three (3) years to obtain entitlement status as an Urban County. The County is in the process of submitting its documentation to qualify for this designation. For the requalification to be possible, LACDA needs to enter into cooperation agreements with all non-entitlement cities, with a population of less than 50,000, within the Los Angeles County.

CITY OF LOMITA

CITY COUNCIL REPORT
Item No.
7k
Tuesday, July 07, 2026 Reg CC MTG, Page *205
2 In order to continue to receive CDBG funding, the City of Lomita is required to send an adopted resolution (Attachment 1) and a signed Cooperation Agreement to the Los Angeles County Development Authority (LACDA) authorizing continued participation (Attachment 2). LACDA has not received the 27-29 Cooperation Agreement from the Department of Housing and Urban Development.

The Cooperation Agreements are executed on three (3) year cycles, the next being July 1, 2027, through June 30, 2030. The current Urban County three-year qualification period will end on June 30, 2027.

The City of Lomita would need to continue its participation in order to continue receiving CDBG funding. The City of Lomita has been approved to receive a CDBG allocation during fiscal year 2026-2027 of $140,108.

FISCAL IMPACT
By participating in the Los Angeles Urban CDBG Program, the City of Lomita would be allocated an estimated $440,000 in CDBG funds between July 1, 2027, and June 30, 2030.

OPTIONS

1. Approve staff’s recommendation

2. Give staff alternative direction

ATTACHMENTS

1. Draft Resolution

2. Cooperation Agreement
Approved by:
.
______________________
Andrew Vialpando
City Manager
Prepared by:
__________________________
Adrian Fernandez, Community and Economic Development Director Tuesday, July 07, 2026 Reg CC MTG, Page *206
Attachment 1
RESOLUTION NO. 2026-40

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LOMITA,

CALIFORNIA, APPROVING PARTICIPATION IN THE LOS ANGELES

URBAN COUNTY PROGRAM
Whereas, the City of Lomita ("City") desires to participate in the Los Angeles Urban County Program for Community Development Block Grant ("CDBG") funds, and if applicable, the HOME Investment Partnerships ("HOME") Program, and the Emergency Solutions Grant ("ESG") Program, in the County's Consolidated Plan for Fiscal Years 2027-2029, commencing on July 1, 2027, and through June 30, 2030; and Whereas, the City authorizes the execution of a Cooperation Agreement with the County of Los Angeles in order to receive said CDBG funds;

THE CITY COUNCIL OF THE CITY OF LOMITA, CALIFORNIA, DOES HEREBY FIND, ORDER AND RESOLVE AS FOLLOWS:

Section 1. The City Council adopts and approve its participation in the Los Angeles County Urban County Program and receiving CDBG funds, and if applicable, HOME and ESG Program funds, and execution of the Cooperation Agreement between the City of Lomita and the County of Los Angeles for the time period of July 1, 2024, through June 30, 2027 and self-renewing thereafter.

Section 2. The City Council authorizes the Mayor, or his/her designee, to execute the Cooperation Agreement, any and all related documents necessary, for participation in the Los Angeles Urban County Program on behalf of the City.

Section 3: This Resolution will become effective immediately upon adoption.

Section 4: The City Clerk shall certify the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED, APPROVED AND ADOPTED, this 7th day of July 2026. ________________________________
Cindy Segawa, Mayor
APPROVED AS TO FORM: ATTEST:

Trevor Rusin, City Attorney Kathleen Horn Gregory,City Clerk Tuesday, July 07, 2026 Reg CC MTG, Page *207
FYs 2027-2029 CITY OF LOMITA Cooperation Agreement
June 2026 1

COUNTY OF LOS ANGELES

COMMUNITY DEVELOPMENT BLOCK GRANT ENTITLEMENT PROGRAM

HOME INVESTMENT PARTNERSHIPS PROGRAM

EMERGENCY SOLUTIONS GRANTS PROGRAM

PARTICIPATING CITY

COOPERATION AGREEMENT
This COOPERATION AGREEMENT (Agreement) is being entered into on this 1st day of JULY 2026, to be effective on the 1st day of July 2027, by and between the CITY OF LOMITA (City) and the County of Los Angeles (County), by and through the Los Angeles County Development Authority (LACDA) acting as the County's agent, and shall remain in effect for Fiscal Years 2027-2029. The County and the City are collectively referred to as the “Parties” or individually “Party.”
WITNESSETH THAT:

WHEREAS, the City Council of the City authorized the City Manager, or designee, to execute this Agreement on the City's behalf;
WHEREAS, the Board of Supervisors of the County authorized the LACDA, through its Executive Director, or designee, to execute this Agreement as the agent of the County on the County's behalf;
WHEREAS, in 1974, the U.S. Congress enacted and the President signed a law entitled, the Housing and Community Development Act of 1974 (Act); WHEREAS, the Parties desire to cooperate to undertake, or assist in undertaking, community development, essential community renewal, lower-income housing assistance activities, specifically urban renewal and publicly assisted housing, including, but not limited to, the improvement or development of housing for persons of low- to moderate-incomes, and other community or urban renewal activities as approved between the Parties in the CDBG agreements, including the Consolidated Plan, as authorized by the Act, the Cranston-Gonzalez National Affordable Housing Act (NAHA), and the U.S. Housing Act of 1937, as amended; WHEREAS, the Community Development Block Grant (CDBG) Entitlement Program, the HOME Investment Partnerships (HOME) Program, and the Emergency Solutions Grants (ESG) Program are required to have an approved comprehensive housing strategy as authorized under NAHA;
WHEREAS, the County qualifies as an Urban County as defined under the U.S.

Department of Housing and Urban Development (HUD) and, as such, receives allocations of CDBG Entitlement Program funds;
WHEREAS, HUD requires the County to re-qualify as an Urban County every three years Attachment 2
Tuesday, July 07, 2026 Reg CC MTG, Page *208
FYs 2027-2029 CITY OF LOMITA Cooperation Agreement
June 2026 2
and to enter into cooperation agreements with participating cities for the Fiscal Years 2027-2029 Urban County qualification period;
WHEREAS, the City desires to participate in the County's Urban County CDBG Entitlement Program for Fiscal Years 2027-2029 (Urban County Program); WHEREAS, as the Urban County, the County assumes all responsibilities of an applicant under federal statutes and regulations, including the analysis of needs, establishment of objectives, preparation of the Consolidated Plan and related submissions, and the provision of all required certifications and assurances on behalf of the County and participating cities; WHEREAS, this Agreement is authorized under State and local laws and provides full legal authority for the County, acting through the LACDA, to undertake or assist in undertaking, eligible community development and housing activities within the City for the benefit of its residents; and
WHEREAS, by executing this Agreement, the Parties affirm their mutual intention for the City to participate in the County's Urban County program for the Fiscal Years 2027-2029 CDBG Uban County qualification period.

NOW, THEREFORE, the Parties agree as follows:

1. General
a. Authorization to Implement Activities. The City hereby authorizes the County, acting through the LACDA, to perform, or cause to be performed all actions necessary or appropriate to implement eligible community development and housing activities within the City for Fiscal Years 2027-2029. Any references to the County shall also refer to the LACDA acting as the agent of the County.

The City's activities may include, but are not limited to, the improvement or development of housing for persons of low- and moderate-income and other eligible activities authorized under Title 1 of the Act, as amendment, and where applicable, the HOME and ESG programs. These activities may be funded from the County's CDBG Entitlement Program allocation and, where applicable HOME and ESG funds, including any program income generated therefrom. b. Cooperation. The County and the City agree to cooperate to undertake, or assist in undertaking, essential community development and housing assistance activities within the benefit of the City, as approved and authorized between the Parties in this Agreements including the Consolidated Plan. c. State CDBG Program. The City understands and agrees that it may not apply for grants under the State CDBG Program for the Urban County Term, defined below, in which the City participates in the Urban County CDBG Program. The Tuesday, July 07, 2026 Reg CC MTG, Page *209
FYs 2027-2029 CITY OF LOMITA Cooperation Agreement
June 2026 3
County agrees that the CDBG funds that the City is entitled to will be utilized to benefit the City.
d. Covered HUD Programs. This Agreement covers the following formula funding programs administered by HUD where the County receives the following direct entitlement funding: the CDBG Program, the HOME Program and the ESG Programs.

The City understands and agrees that it may only receive such funding where HOME and ESG formula are allocated funds from the County. The City understands and agrees that it may receive a formula allocation under the HOME and ESG Programs only through the Urban County. This does not preclude the Urban County or the City from applying for HOME or ESG funds from the State, if the State allows.
e. Subrecipient Status. Pursuant to 24 CFR § 570.501(b), the City is subject to all requirements applicable to subrecipients, including the requirement of a written agreement as set forth in 24 CFR § 570.503.

2. Term; Withdrawal Rules. The Agreement shall remain in effect for the three-year program period of Fiscal Years 2027 - 2029, commencing July 1, 2027 and ending June 30, 2030 (Term), and until the expenditure of all CDBG funds, or where applicable, HOME and ESG funds granted and program income received during the three-year program period are expended and the funded activities completed. Neither the County nor the City may terminate, withdraw, or be removed from the Urban County Program during the three-year program period or while this Agreement remains in effect.

This Agreement will renew automatically for participation for one successive three-year Urban County qualification period, unless the County or the City provides written notice to the other party that it elects not to participate in a new qualification period. The terminating party shall send a copy of the notice of termination to the HUD field office by the date specified on the HUD Exchange Urban Counties website. The County will notify the City in writing of the City’s right to make this election. A copy of the County’s notification must be sent to the HUD filed office by the date specified on the HUD Exchange Urban Counties website.

3. Reversion of Assets/Unspent Funds. Following the end of the three-year Urban County qualification period, and after resolution of any financial or programmatic findings, if the City elects not to participate in the next qualification period and does not qualify as a metropolitan city under HUD regulations, the City shall not be entitled to request the transfer of any unspent CDBG funds or remaining balances. Such unspent funds shall remain with the County and shall be reprogrammed to the Supervisorial District funding pool in which the City is located, consistent with 24 CFR 570.503(b)(7).

4. Amendments. The Parties agree to adopt amendments to this Agreement as may be required by HUD to meet any new Urban County Qualification requirement(s) for subsequent qualification cycles, when applicable. Failure by either Party to adopt any such amendments, and Tuesday, July 07, 2026 Reg CC MTG, Page *210
FYs 2027-2029 CITY OF LOMITA Cooperation Agreement
June 2026 4
to submit such amendment to HUD, will void this Agreement for the applicable qualification period.

5. Prohibition on Transfer or Exchange of Funds. The County and the City shall not sell, trade, assign, or otherwise transfer any portion of CDBG funds, or, where applicable, HOME and ESG funds, to any metropolitan city, urban county, unit of general local government, or insular area that directly or indirectly receives such funds, in exchange for any other funds, credits or non-federal consideration. All funds must be used solely for eligible under Title I of the Act, as amended, and applicable HOME and ESG statutes and regulations.

6. Program Income
a. Reporting and Remittance. The City shall report to the County any program income generated from the use of CDBG funds, and, where applicable, HOME and ESG funds. All such program income shall be remitted to the County within 30 days of receipt. Program income shall be used solely for eligible activities in accordance with all applicable CDBG, HOME and ESG regulations in effect at the time of receipt or use.
b. Disposition of Program Income. The County and City shall not terminate or withdraw from the Agreement while it remains in effect. The County may transfer the program income to the City, upon its termination of Urban County participation, provided that the City begins participating as an independent CDBG Entitlement grantee and agrees to use the program income in its own CDBG Entitlement program.
c. Program Income After Closeout or Termination. In the event of grant closeout or termination of this Agreement, any program income on hand or received after closeout or termination shall be remitted to the County within sixty (60) days. Such program income shall remain subject to all applicable CDBG, HOME, and ESG requirements.
d. Program Income from Real Property. All program income generated from the disposition or transfer of real property acquired or improved by the City using CDBG funds, and, where applicable, HOME and ESG, funds or program income, during the Urban County Term shall remain subject to all terms and conditions of this Agreement and all applicable federal regulations.

7. Recordkeeping and Monitoring. The County is responsible for reporting to HUD on the use of all program income; the City shall maintain complete and accurate records, accounts, and documentation sufficient to demonstrate compliance with all applicable CDBG, HOME, and ESG requirements. The City shall make such records available to the County upon request for monitoring, reporting, and audit purposes.

8. Compliance with Federal Laws and Regulations. In performing this Agreement, the Parties shall take all actions necessary to ensure compliance with the County's certification Tuesday, July 07, 2026 Reg CC MTG, Page *211
FYs 2027-2029 CITY OF LOMITA Cooperation Agreement
June 2026 5
(under section 104(b) of Title I of the Housing and Community Development Act of 1974), that City grant will be conducted and administered in conformity with:
• Title VI of the Civil Rights Act of 1964 (and the implementing regulations at 24 CFR Part 1);
• Fair Housing Act (Title VIII of the Civil Rights Act of 1968), and the implementing regulations at 24 CFR Part 100, and the duty to affirmatively further fair housing (AFFH); and
• Section 109 of Title I of the Housing and Community Development Act of 1974, and the implementing regulations at 24 CFR Part 6, which incorporates:
o Section 504 of the Rehabilitation Act of 1973, and the implementing regulations at 24 CFR Part 8;
o Title II of the Americans with Disabilities Act, and the implementing regulations at 28 CFR Part 35;
o Age Discrimination Act of 1975, and the implementing regulation at 24 CFR Part 146;
o Section 3 of the Housing and Urban Development Act of 1968; o Uniform Relocation and Real Property Acquisition Policies Act of 1970, and the implementing regulations at 49 CFR Part 24;
o Section 104(d) of the Housing and Community Development Act of 1974, implementing regulation at 24 CFR Part 42; and
• Other applicable federal laws and regulations.

CDBG, and where applicable HOME and ESG, funds in no event will be used for any activities in or in support of City failure to affirmatively further fair housing or that impedes the County’s actions to comply with the County's fair housing certification and duty to affirmatively further fair housing.

9. Records and Audit Access. The City shall make available for inspection and audit by the County and HUD, upon request, all books, records, documents, and files relating to activities funded under CDBG and, where applicable, HOME and ESG programs. Such records shall be retained for at least five (5) years after the closeout of the applicable grant or completion of the activity, whichever is later, in accordance with 24 CFR 570.506.

10. Excessive Force and Anti-Blockade Policies. The County and the City certifies that each have adopted and are enforcing:
a. A policy prohibiting the use of excessive force by law enforcement agencies within its jurisdiction against individuals engaged in non-violent civil rights demonstrations; and b. A policy prohibit law enforcement agencies from physically barring the Tuesday, July 07, 2026 Reg CC MTG, Page *212
FYs 2027-2029 CITY OF LOMITA Cooperation Agreement
June 2026 6
entrance to or exit from a facility or location that is the subject of such non-violent civil rights demonstrations.

11. No Third-Party Beneficiaries. This Agreement is made and entered into for the sole protection and benefit of the Parties hereto and shall not create any rights in any third parties.

No other person or entity shall have the right or action based upon the provisions of the Agreement.

12. Indemnification. City agrees to indemnify, defend, and hold harmless County and its authorized officers, employees, agents, and volunteers from any and all claims, actions, losses, damages, and/or liability arising from City acts, errors or omissions and for any costs or expenses incurred by County on account of any claim therefore, except where such indemnifications is prohibited by law. City shall promptly notify County in writing of the occurrence of any such claims, actions, losses, damages, and/or liability.

City shall indemnify and hold harmless County against any liability, claims, losses, demands, and actions incurred by County as a result of the determination by HUD or its successor that activities undertaken by City under the program(s) fail to comply with any laws, regulations, or policies applicable thereto or that any funds billed by and disbursed to City under this Agreement were improperly expended.

13. Severability. Each paragraph and provision of this Agreement is severable from each other provision and in the event any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provision will never the less continue in full force without being impaired or invalidated in any way

14. Assignment. City shall not make any sale, assignment, conveyance or lease of any trust or power, or transfer in any other form with respect to this Agreement, or delegate or assign any interest in this Agreement without prior written approval of the County.

15. Interpretation; Governing Law. This Agreement and any dispute arising hereunder shall be governed by and interpreted in accordance with the laws of the State of California. This Agreement shall be construed as a whole according to its fair language and common meaning to achieve the objectives and purposes of the Parties hereto, and the rule of construction to the effect that ambiguities are to be resolved against the drafting Party shall not be employed in interpreting this Agreement, all Parties having been represented by counsel in the negotiation and preparation hereof.

16. Waiver. Failure by a Party to insist upon the strict performance of any of the provisions of this Agreement by the other Party, or the failure by a Party to exercise its rights upon the default of the other Party, shall not constitute a waiver of such Party’s right to insist and demand strict compliance by the other Party with the terms of this Agreement thereafter.

17. Jurisdiction and Venue. Any action at law or in equity arising under this Agreement or brought by a Party hereto for the purpose of enforcing, construing or determining the validity of any provision of this Agreement shall be filed in the Superior Court of California, County of Los Angeles, State of California, and the Parties hereto waive all provisions of law Tuesday, July 07, 2026 Reg CC MTG, Page *213
FYs 2027-2029 CITY OF LOMITA Cooperation Agreement
June 2026 7
providing for the filing, removal or change of venue to any other court or jurisdiction.

18. Amendments. No change, amendment, or modification to the Agreement shall be valid or binding upon City or County unless such change, amendment, or modification is in writing and duly executed. City and County agree to adopt any necessary amendments to this Agreement to incorporate changes required by HUD as set forth in the Urban County Qualification Notice.

Amendments must be submitted to HUD as provided in the Urban County Qualification Notice and failure to do so will void the automatic renewal for such qualification period.

19. Counterparts; Electronic Signatures. This Agreement may be executed in counterparts, each of which shall be deemed an original, and all of which together shall constitute one and the same instrument. Signatures transmitted by facsimile, email, or other electronic means shall be deemed original signatures for all purposes.

Tuesday, July 07, 2026 Reg CC MTG, Page *214
S-1
IN WITNESS WHEREOF, the Board of Supervisors of the County of Los Angeles has caused this Agreement to be subscribed by the Executive Director of the LACDA, and the City has subscribed the same through its duly authorized officers, on the day, month, and year first above written.

County Counsel Certification
The office of the County Counsel hereby certifies that the terms and provisions of this Agreement are fully authorized under state and local laws, and that the Agreement provides full legal authority for the County to undertake or assist in undertaking essential community development and housing assistance activities, specifically urban renewal and public-assisted housing.

By: ___________________________________ ___________________________ Principal Deputy County Counsel Date

COUNTY OF LOS ANGELES
By: ________________________________
EMILIO SALAS, Executive Director
Los Angeles County Development Authority
APPROVED AS TO FORM:

DAWYN R. HARRISON
County Counsel
By: ________________________________

BEHNAZ TASHAKORIAN
Principal Deputy County Counsel
Tuesday, July 07, 2026 Reg CC MTG, Page *215
S-2
IN WITNESS WHEREOF, the Board of Supervisors of the County of Los Angeles has caused this Agreement to be subscribed by the Executive Director of the LACDA, and the City has subscribed the same through its duly authorized officers, on the day, month, and year first above written.

CITY OF LOMITA
By: ________________________________
CITY MANAGER OR DESIGNEE (Signature)
_______________________________
Print Name, Title
ATTEST:

City Clerk
By: ________________________________
APPROVED AS TO FORM:

By: ________________________________

CITY ATTORNEY
Tuesday, July 07, 2026 Reg CC MTG, Page *216
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Emma Kelley, Parks and Recreation Director MEETING DATE: July 7, 2026
SUBJECT: Update on the 2026 Sister City Delegation Visit, Hospitality and Related Activities

RECOMMENDED ACTION
Receive and file the update regarding the 2026 Sister City delegation visit, hospitality, and related activities.

BACKGROUND
The City of Lomita and Takaishi City, Japan have maintained a longstanding Sister City relationship that has fostered cultural exchange, educational opportunities, and international goodwill between the two communities. This year marks the 45th year that Lomita and Takaishi have maintained their Sister City bond, reflecting decades of friendship, collaboration, and mutual understanding.

Additionally, Takaishi City is commemorating its 60th city Anniversary in 2026, marking an important milestone in the city's history. These anniversaries provide a meaningful opportunity to celebrate the enduring bond between the two communities, recognize past achievements, and explore future opportunities for cultural, educational, and civic exchange.

DISCUSSION
On June 11, 2026, the Sister Cities Ad Hoc Committee, consisting of Mayor Segawa and Councilmember Waronek, met with the Sister Cities Association to discuss plans for a delegation from Takaishi to visit Lomita this summer. The discussion included potential events and hospitality activities associated with welcoming the delegation and commemorating these important milestones.

CITY OF LOMITA

CITY COUNCIL REPORT
Item No.
8a
Tuesday, July 07, 2026 Reg CC MTG, Page *217
2 The Sister City Ad Hoc Committee recommended that the following activities be brought to the full City Council for review and consideration.

July 25th – Sister City Guests Arrive
• City Council to host a meet and greet with the Sister City guests at the Railroad Museum at 2:30pm.
• City to provide tables and chairs for a sit-down lunch for City Council and guests. • City Council to present Sister City guests with Lomita branded welcome gifts.

July 30th - Zoom phone call with Japan and Council
• City Council and Sister City guests to meet in the Council Chambers for a Zoom meeting at 4:00pm with dignitaries from Japan
• City to present proclamation from Supervisors Hahn's office.

August 4th –Sister City Guests Recognition at National Night Out (6pm – 8pm City Hall Front Lawn)
• City Council to adopt a proclamation at the July 21 City Council Meeting for presentation to the Sister City guests during National Night Out program on stage. • Extend an invitation to the Sister City delegation to attend National Night Out. • Mayor Segawa to welcome attendees, offer brief remarks and formally recognize the visiting Sister City guests.

August 6th – Farewell dinner in the Lomita City Hall Foyer • Host a farewell dinner in the foyer for City Council, Sister City delegation, and invited guests.
• Confirm the anticipated attendance and coordinate meal preferences with the Sister City delegate.
• City to cover the cost of the dinner.

FISCAL IMPACT
If approved, funding for activities and expenses associated with welcoming the Lomita Sister City be nominal and included in the Adopted Budget.

VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 3: Community Engagement & Communications - Building trust through open, inclusive communication.

OPTIONS

1. Receive and File

2. Provide alternate direction
Tuesday, July 07, 2026 Reg CC MTG, Page *218
3 ATTACHMENTS
None.

Prepared by: Approved by:
_______________________ ______________________
Emma Kelley Andrew Vialpando
Parks and Recreation Director City Manager
Tuesday, July 07, 2026 Reg CC MTG, Page *219
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Deanna Fraley, PE, Public Works Director
MEETING DATE: July 7, 2026
SUBJECT: Second Amendment to the Agreement with David Evans & Associates for Engineering Design Services for Street
Reconstruction Project - Zone G for Phases 3 and 4

RECOMMENDED ACTION
Approve the Second Amendment to Agreement No. 2022-31 with David Evans & Associates (DEA) for additional engineering design and construction support services associated with Phase 3 and 4 of the Zone G Street Reconstruction Project for an additional amount of $71,870, plus a contingency amount of $7,500 for unexpected costs, for a total amended contract amount of $397,258.

BACKGROUND
On July 19, 2022, the City Council approved Professional Services Agreement No. 2022- 31 with David Evans & Associates (DEA) to provide engineering design and construction support services for Zone G Street Reconstruction Project (Attachment 1). DEA was selected by the City to provide engineering design and construction support services for the Zone G Street Reconstruction Project.

Since the start of the project and as design progressed, it was determined that constructing the project as a single phase was no longer the most cost-effective approach. The project was subsequently divided into four construction phases to spread construction costs over multiple fiscal years and to allow planned water main replacement improvements to be completed before pavement rehabilitation on several streets. This additional coordination effort required use of some of the original contract contingency.

The Zone G Street Reconstruction Project phasing is shown on the map in Attachment 2.

Following completion of the design for Phase 1 and due to increased construction costs and additional construction support required during implementation, the remaining budget for engineering services was insufficient to complete Phases 2 through 4. As a result, on

CITY OF LOMITA

CITY COUNCIL REPORT
Item No.
8b
Tuesday, July 07, 2026 Reg CC MTG, Page *220
2 June 3, 2025, the City Council approved the First Amendment to the agreement (Agreement No. 2025-21) to provide additional engineering design and construction support services for the remaining phases of the project (Attachment 3).

Phase 2 design was completed and advertised for bids on July 31, 2025. Construction began in November 2025 and is currently in the project closeout phase.

DISCUSSION
Construction of Phases 3 and 4 have been intentionally delayed to coordinate with the Zone G Water Main Replacement Project. As a best practice for preserving the integrity and lifespan of newly constructed pavement, staff makes every effort to avoid trenching into recently resurfaced streets. Since the Zone G Water Main Replacement Project includes replacement of water mains beneath three streets scheduled for reconstruction in Phases 3 and 4, roadway construction has been deferred until completion of the water improvements. This will minimize disruption to the surrounding residents and businesses by phasing the water main work with the roadway reconstruction work. The Zone G Water Main Replacement Project is anticipated to be completed in Fall 2026.

While preparing for the next phases of construction, staff identified an opportunity to improve project efficiency by incorporating additional street rehabilitation work planned for Fiscal Year 2026-27 into the existing Zone G Street Reconstruction Project.

Combining these improvements into a single design package and future construction contract will reduce consultant procurement efforts, minimize construction mobilization costs, and provide greater overall project efficiency. The additional street segments are 254th Street between Cypress Street and the western terminus, 255th Street between Walnut Street and the eastern City limit, and Doria Avenue (north and south of 252nd Street). In addition, the proposed amendment includes extending the reconstruction limits on Walnut Street from 253rd Street to approximately 25 feet north of 253rd Place. The additional segment on Walnut Street will also include three curb extensions and six ADAcompliant curb ramps. Finally, installation of a new fire hydrant and associated water service lateral at the end of Alcor Street will be included to improve fire protection.

DEA has submitted a proposal for the additional engineering design and construction support services associated with this expanded scope (Exhibit A-2 of Attachment 4). Staff have reviewed the proposal and determined the scope and associated fees are reasonable and necessary to complete the remaining phases of the Zone G Street Reconstruction Project.

Approval of the Second Amendment will allow the consultant to complete final design, bidding support, construction support, and record drawing preparation for the expanded project limits. Table 1 shows the contract history.

Table 1
Tuesday, July 07, 2026 Reg CC MTG, Page *221
3 Agreement Amount
Original Agreement (2022) $221,835
Amendment No. 1 w/ Contingency (2025) $ 96,053
Amendment No. 2 w/ Contingency (Proposed) $ 79,370
Revised Total Contract $397,258

FISCAL IMPACT
The Second Amendment increases the original contract amount by $79,370.00, bringing the new total contract amount to $397,258.00. The increase will be fully funded by the Gas Tax.

VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 5: City Infrastructure & Water Utility – Investing in reliable, sustainable infrastructure.

OPTIONS

1. Approve recommended action.

2. Provide Staff with further direction.

ATTACHMENTS

1. Agreement No. 2022-31 with David Evans & Associates

2. Zone G Street Reconstruction with Additional Locations Map

3. Agreement No. 2025-21: First Amendment to Agreement No. 2022-31

4. Second Amendment to Agreement No. 2022-31 with Exhibit A-2 (Letter Proposal) Prepared by: Approved by:
_______________________ ______________________
Deanna Fraley, P.E. Andrew Vialpando
Public Works Director City Manager
Tuesday, July 07, 2026 Reg CC MTG, Page *222
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251

CONTRACT FOR PROFESSIONAL SERVICES

BETWEEN
Agree No 2022-31
THE CITY OF LOMITA AND DAVID EVANS AND ASSOCIATES, Inc.

This AGREEMENT for Engineering Design Services is entered into this 19th day of July, 2022, by and between the CITY OF LOMITA, a general law city and municipal corporation ("CITY") and David Evans and Associates, Inc. ("CONSUL TANT").

RECITALS
A. CITY does not have the personnel able and/or available to perform the services required under this agreement.

B. Therefore, CITY desires to contract out for Engineering Design Services for Street Reconstruction Project - Zone G ·
c. CONSUL TANT warrants to CITY that it has the qualifications, experience and facilities to perform properly and timely the services under this Agreement.

D. CITY desires to contract with CONSULTANT to perform the services as described in Exhibit .

A of this Agreement.

NOW, THEREFORE, based on the foregoing recitals, CITY and CONSULTANT agree as follows:

1. CONSIDERATION AND COMPENSATION.

A As partial consideration, CONSUL TANT agrees to perform the work listed in the SCOPE OF SERVICES, attached as Exhibit A.

B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement.

C. As additional consideration, CITY agrees to pay CONSULTANT an amount not to exceed $221,835, for CONSUL TANT's services, unless otherwise specified by written amendment to this Agreement.

D. No additional compensation shall be paid for any other expenses incurred, unless first · approved by the City Manager or his designee.

E. CONSUL TANT shall submit to CITY, by not later than the 10th day of each month, its bill for services itemizing the fees and costs incurred during the previous

Page 1 of 13 ends

Attachment 1
Tuesday, July 07, 2026 Reg CC MTG, Page *223
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-DOF45B6F5251

2. month. CITY shall pay CONSUL TANT all uncontested amounts set forth in the · CONSULTANT'S bill within 30 days after it is received.

SCOPE OF SERVICES.

A. CONSUL TANT will perform the services and activities set forth in the SCOPE OF SERVICES attached hereto as Exhibit A and incorporated herein by this reference.

If any part of Exhibit A is inconsistent with the terms of this Agreement, the terms of this Agreement shall control.

B. Except as herein otherwise expressly specified to be furnished by CITY, CONSUL TANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space, and facilities necessary or . proper to perform and complete the work and provide the professional services required of CONSUL TANT by this Agreement.

3. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit an invoice to CITY which lists the reimbursable costs, the specific tasks performed, and, for work that includes deliverables, the percentage of the task completed during the billing period.

4. TIME OF PERFORMANCE. The services of CONSUL TANT are to commence upon receipt of a notice to proceed from CITY and shall continue until all authorized work is completed to CITY's reasonable satisfaction, in accordance with the schedule incorporated in "Exhibit A," unless extended in writing by CITY.

5. FAMILIARITY WITH WORK. By executing this Agreement, CONSUL TANT represents that CONSUL TANT has (a) thoroughly investigated and considered the scope of services to be performed; (b) carefully considered how the services should be performed; and (c) understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.

6. KEY PERSONNEL. CONSULTANT's key person assigned to perform work under this Agreement is Marie Marston, PE. CONSUL TANT shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of CITY.

7. TERM OF AGREEMENT. The term of this Agreement shall commence upon execution by both parties and shall expire upon completion of the work, unless earlier termination occurs under Section 12 of this Ag-reement or extended in writing in advance by both parties.

8. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized

Page 2 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *224
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251 in writing, executed by CONSUL TANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.

9. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number.

10. PERMITS AND LICENSES. CONSULTANT will obtain and maintain during the term of this Agreement all permits, licenses, and certificates that may be required by local, state and federal laws in connection with the performance of services under this Agreement, including a business license as specified in Title VI, Chapter 2 of the Lomita Municipal Code.

11. PREVAILING WAGES.

A. Prevailing Wage. CONSUL TANT is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, CONSUL TANT agrees to fully comply with such Prevailing Wage Laws.

Upon request, CITY shall provide CONSULTANT with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

CONSUL TANT shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available . to interested parties upon request and shall post copies at the CONSULTANT'S principal place of business and at the project site. It is the intent of the parties to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777 .5, 1813, and 1815 of the Labor Code within this Agreement, and CONSULTANT shall therefore comply with such Labor Code sections to the fullest extent required by law. CONSUL TANT shall defend, indemnify and hold the CITY, its officials, officers, employees, agents, and volunteers free and harmless from any claim or · liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

B. Registration/DIR Compliance. If the services are being performed on a public works project of over $25,000 when the project is for construction, alteration, demolition, installation, or repair work, or a public works project of over $15,000 when the project is for maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, CONSUL TANT and all subconsultants must be registered with the Department of Industrial Relations . ("DIR"). CONSULTANT shall maintain registration for the duration of the project and require the same of any subconsultants. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be CONSULTANT'S

Page 3 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *225
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-DOF45B6F5251 sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Any stop orders issued by the DIR against CONSUL TANT or any subconsultant that :
affect CONSULTANT'S performance of services, including any delay, shall be CONSULTANT'S sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONSULTANT caused delay and shall not be compensable by CITY. CONSTRUCTION shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONSULTANT or any subconsultant..

C. Labor Certification. By its signature hereunder, CONSUL TANT certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code and agrees to comply with such provisions before commencing the performance of the Services.

D. Employment of Apprentices, CONSULTANT and all subconsultants shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, .

California, or from the Division of Apprenticeship Standards and its branch offices.

E. CONSUL TANT or subconsultants may not perform work on a public works project with a subconsultant who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between CONSUL TANT and a debarred subconsultant is void as a matter of law. A debarred subconsultant may not receive any public money for performing work as a subconsultant on a public works contract. Any public money that is paid or may have been paid to a debarred subconsultant by CONSULTANT on the project shall be returned to CITY. CONSULTANT shall be responsible for the payment of wages to workers of a debarred subconsultant who has been allowed to work on the Project.

F. CONSUL TANT agrees to bind every subconsultant to the terms of the Agreement as far as such terms are applicable to subconsultant's portion of the work. · CONSULTANT shall be as fully responsible to CITY for the acts and omissions of its subconsultants and of persons either directly or indirectly employed by its subconsultants, as CONSULTANT is for acts and omissions of persons directly employed by CONSULTANT. Nothing contained in these Agreement shall create any contractual relationship between any subconsultant and CITY.

12. TERMINATION.

Page 4 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *226
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251 A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination shall be in writing.

B. CONSUL TANT may terminate this Agreement. Notice will be in writing at least 30 days before the effective termination date.

C. In the event of such termination, CONSUL TANT shall cease services as of the date of termination, all finished or unfinished documents, data, drawings, maps, and other materials prepared by CONSULTANT shall, at CITY's option, become CITY's property, and CONSUL TANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination.

D. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.

13. INDEMNIFICATION.

A. CONSULTANT shall indemnify, defend with counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONSULTANT's performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT, regardless of CITY'S passive negligence, but excepting such loss or damage which is caused by the sole active negligence or willful misconduct of CITY. Should CITY in its sole discretion find CONSULTANT'S legal counsel unacceptable, then CONSUL TANT shall reimburse CITY its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation. CONSUL TANT shall promptly pay any final judgment rendered against CITY (and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
i. If CONSULTANT'S obligation to defend, indemnify, and/or hold harmless arises out of CONSULTANT'S performance of ~'design professional" services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, CONSULTANT'S indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT, and, upon CONSULTANT obtaining a final adjudication by a court of competent jurisdiction, CONSULTANT'S liability for such claim, including the cost to defend, shall not exceed CONSULTANT'S proportionate percentage of fault.

Page 5 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *227
DocuSign Envelope ID: 04837O57-3FDA-4596-8CBD-D0F45B6F5251 B. The requirements as to the types and limits of insurance coverage to be maintained by CONSUL TANT as required by Section 18, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSUL TANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.

14. ASSIGNABILITY. This Agreement is for CONSULTANT's professional services.

CONSUL TANT's attempts to assign the benefits or burdens of this Agreement without CITY's written approval are prohibited and will be null and void.

15. INDEPENDENT CONSULTANT. CITY and CONSULTANT agree that CONSUL TANT will act as an independent CONSUL TANT and will have control of all work and the manner in which it is performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSUL TANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSUL TANT as to the details of doing the work or to exercise a measure of control over the work means that CONSUL TANT will follow the direction of the CITY as to end results of the work only.

16. AUDIT OF RECORDS.

A. CONSUL TANT agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement. CONSULTANT agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement. CONSUL TANT further agrees to maintain such records for a period of three (3) years following final payment under this Agreement.

B. CONSULTANT will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Agreement.

17. CORRECTIVE MEASURES. CONSUL TANT will promptly implement any corrective measures required by CITY regarding the requirements and obligations of this Agreement. CONSULTANT will be given a reasonable amount of time as determined by CITY to implement said corrective measures. Failure of CONSUL TANT to implement required corrective measures shall result in immediate termination of this Agreement.

18. INSURANCE REQUIREMENTS.

A. CONSUL TANT, at CONSULTANT's own cost and expense, shall procure and

Page 6 of 13 ends

-----------------------------------~- Tuesday, July 07, 2026 Reg CC MTG, Page *228 DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251 maintain, for the duration of the contract, the following insurance policies:

1. Workers Compensation Insurance as required by law. CONSUL TANT shall require all subconsultants similarly to provide such compensation insurance for their respective employees. Any notice of cancellation or non-renewal of all Workers' Compensation policies must be received by CITY at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against CITY, its officers, agents, employees, and volunteers for losses arising from work performed by CONSULTANT for CITY.

2. General Liability Coverage. CONSUL TANT shall maintain commercial general liability insurance in an amount of not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.

3. Automobile Liability Coverage. CONSUL TANT shall maintain automobile liability insurance covering bodily injury and property damage for all activities of CONSUL TANT arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired, and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.

4. Professional Liability Coverage. CONSULTANT shall maintain professional liability insurance for protection against claims to the extent arising out of the negligent acts, errors, or omissions which may arise from CONSULTANT'S operations under this Agreement, whether such operations be by CONSUL TANT or by its employees, subconsultants, or subconsultants. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single-limit-peroccurrence basis. When coverage is provided on a "claims made basis," CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement and will cover CONSUL TANT for all claims made by CITY arising out of any negligent acts, errors or omissions of CONSUL TANT, or its officers, employees or agents during the time this Agreement was in effect.

B. Endorsements. Each general liability, automobile liability and professional liability insurance policy shall be issued by a financially responsible insurance company or companies admitted and authorized to do business in the State of California, or which is approved in writing by CITY, and shall be endorsed as follows.

CONSULTANT also agrees to require all CONSULTANTS, and subconsultants to do likewise.

Page 7 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *229
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251

1. "The CITY, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to the commercial general liability and automobile liability arising out of work performed by or on behalf of the CONSULTANT, including materials, parts, or equipment furnished in connection with such work or operations."

2. The commercial general liability and automobile liability policy shall be considered primary insurance as respects CITY, its elected or appointed officers, officials, employees, agents, and volunteers. Any insurance maintained by CITY, including any self-insured retention CITY may have, shall be considered excess insurance only and shall not contribute with this policy.

3. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.

4. The insurer waives all rights of subrogation against CITY, its elected or appointed officers, officials, employees, or agents.

5. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to CITY, its elected or appointed officers, officials, employees, agents, or volunteers.

6. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits to not meet the requirements of this Agreement except after thirty (30) days' written notice has been received by CITY.

C. CONSULTANT agrees to provide prompt notice to CITY of any claim or loss against CONSUL TANT arising out of the work performed under this agreement.

CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY ..

D. Any deductibles or self-insured retentions must be declared to and approved by CITY. At CITY's option, CONSUL TANT shall demonstrate financial capability for payment of such deductibles or self-insured retentions.

E. CONSUL TANT shall provide certificates of insurance with original endorsements to CITY as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with CITY on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with CITY at all times during the term of this Agreement.

F. Failure on the part of CONSULTANT to procure or maintain required insurance

Page 8 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *230
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251 shall constitute a material breach of contract under which CITY may terminate this Agreement pursuant to Section 11 above.

G. The commercial general and automobile liability policies required by this Agreement shall allow CITY, as additional insured, to satisfy the self-insured retention ("SIR") and/or deductible of the policy in lieu of the CONSUL TANT (as the named insured) should CONSULTANT fail to pay the SIR or deductible requirements. The amount of the SIR or deductible shall be subject to the approval of the City Attorney and the Finance Director. CONSUL TANT understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONSULTANT as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CONSULTANT'S behalf upon CONSULTANT'S failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against CONSULTANT for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.

19. USE OF OTHER CONSULTANTS. CONSUL TANT must obtain CITY's prior written approval to use any CONSULTANTs while performing any portion of this Agreement.

Such approval must include approval of the proposed CONSULTANT and the terms of compensation.

20. FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by the CONSUL TANT of the final payment made under this Agreement shall operate as and be a release of CITY from all claims and liabilities for compensation to the CONSULTANT for anything done, furnished or relating to the CONSULTANT'S work or services. Acceptance of payment shall be any negotiation of CITY'S check or the failure to make a written extra compensation claim within ten (10) calendar days of the receipt of that check. However, approval or payment by CITY shall not constitute, nor be deemed, a release of the responsibility and liability of CONSULTANT, its employees, sub-CONSULTANTS and agents for the accuracy and competency of the information provided and/or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by CITY for any defect or error in the work prepared by CONSUL TANT, its employees, sub-CONSUL TANTs and agents.

21. CORRECTIONS. In addition to the above indemnification obligations, the CONSULTANT shall correct, at its expense, all errors in the work which may be disclosed during CITY'S review of CONSULTANT'S report or plans. Should the CONSULTANT fail to make such correction in a reasonably timely manner, such correction shall be made by CITY, and the cost thereof shall be charged to CONSUL TANT. In addition to all other available remedies, CITY may deduct the cost of such correction from any retention amount held by CITY or may withhold payment

Page 9 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *231
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251 otherwise owed CONSUL TANT under this Agreement up to the amount of the cost of correction.

22. NON~APPROPRIATION OF FUNDS. Payments to be made to CONSULTANT by CITY for services preformed within the current fiscal year are within the current fiscal bu,dget and within an available,· unexhausted fund. In the event that CITY does not appropriate sufficient funds for payment of CONSULTANT'S services beyond the current fiscal year, the Agre~ment shall cover payment for CONSULTANT'S only to the conclusion of the last fiscal year in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.

23. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

CITY CONSULTANT
City of Lomita David Evans and Associates, Inc.
24300 Narbonne Avenue 2100 S River Parkwa~1 Suite 100
Lomita1 CA 90717 Portland, OR 97201
ATTN: City Manager ATTN: RA Plummer,.

Senior Vice President
Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the l).S. mail or personally delivered as specified in this Section.

24. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor ret1;1ined any company or person, other than CONSUL TANT's bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT's bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSUL TANT breach or violate this warranty, CITY may rescind this Agreement without liability.

25. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSUL TANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSUL TANT's or CITY's obligations under this Agreement.

Page 10 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *232
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251

26. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.

27. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written.

28. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.

29. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment with signatures of all parties to this Agreement. CITY's city administrator, or designee, may execute any such amendment on behalf of CITY.

30. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects. as having the same effect as an original signature.

31. FORCE MAJEURE. Should performance of this Agreement be impossible due to fire, flood, explosion, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties' control, then the Agreement will immediately terminate without obligation of either party to the other.

32. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided.

33. ATTORNEY'S FEES. The parties hereto acknowledge and agree that each will bear his or its own costs, expenses and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled.

34. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY.

CONSUL TANT represents that its financial resources, surety and insurance

Page 11 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *233
DocuSign Envelope ID: 04837057-3FDA-4596-8CBD-D0F4586F5251 experience, service experience, completion ability, personnel, current workload, experience in dealing with private CONSULTANTs, and experience in dealing with public agencies all suggest· that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency.

35. DISCLOSURE REQUIRED. (CITY and CONSULTANT initials required at one of the following paragraphs)
OR
By their respective initials next to this paragraph, CITY and CONSUL TANT hereby acknowledge that CONSUL TANT is a "CONSUL TANT" for the purposes of the California Political Reform Act because CONSULTANT'S duties would require him or her to make one or more of the governmental decisions set forth in Fair Political · Practices Commission Regulation 18700.3(a)(2) or otherwise serves in a staff capacity for which disclosure would otherwise be required were CONSULTANT employed by CITY. CONSUL TANT hereby acknowledges his or her assuming-office, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the CITY'S Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to CONSUL TANT commencing services hereunder, the City's Manager shall prepare and deliver to CONSULT ANT a memorandum detailing the extent of CONSULTANT'S disclosure obligations in accordance with the CITY'S Conflict of Interest Code.

City Initials __ _
·CONSULTANT Initials __
By their initials next to this paragraph, CITY and CONSUL TANT hereby acknowledge that CONSULTANT is not a "CONSULTANT" for the purpose of the California Political Reform Act because CONSULTANT'S duties and responsibilities are not within the scope of the definition of CONSULTANT in Fair Political Practice Commission Regulation 18700.3(a)(2) and is otherwise not serving in staff capacity in accordance with CITY'S Conflict of Interest Code.

City Initials ,~
CONSUL TANT Initials ~p
IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.

Page 12 of 13 ends

Tuesday, July 07, 2026 Reg CC MTG, Page *234
DocuSign Envelope ID: 04837D57-3FDA-4596-8CBD-D0F45B6F5251

CITY OF LOMITA
an Smoot, City Manager
APPROVED AS TO FORM:

CONSULTANT
By: RA Plummer, Senior Vice President
93-0661195
Taxpayer ID No .
............. ,.,
~,.,
' \
~\
(\ . . )
~'.t_~o~,/1//

Page 13 of 13 ends

--- ~ - -- I
Tuesday, July 07, 2026 Reg CC MTG, Page *235

ENGINEERING DESIGN SERVICES FOR

STREET RECONSTRUCTION PROJECT - ZONES C & F
City of Lomita
0 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com September 22, 2020
City of Lomita
City Clerk’s Office
24300 Narbonne Avenue
Lomita, CA 90717
RE: Proposal for Design of Street Reconstruction Project – Zones C & F Civil Works Engineers (CWE) appreciates the opportunity to submit this proposal. Our proposed team prides themselves with quality, service, expertise in design of street rehabilitation projects. Our well-qualified team has worked together previously on similar projects and has ample resources ready to deliver this project.

PROPOSAL PREPARED FOR:

City of Lomita
City Clerk’s Office
24300 Narbonne Avenue
Lomita, CA 90717
PREPARED BY:

Civil Works Engineers, Inc.
3151 Airway Avenue, Suite T-1
Costa Mesa, CA 92626
714.966.9060
www.civilworksengineers.com
Proposal for Engineering Design Services
for
Street Reconstruction Project – Zone G
March 10, 2022
Revised April 25, 2022
Exhibit A
Tuesday, July 07, 2026 Reg CC MTG, Page *236

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
1 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com Section 1: Cover Letter
March 10, 2022 (revised April 25, 2022)
City of Lomita
City Clerk’s Office
24300 Narbonne Avenue
Lomita, CA 90717
RE: Proposal for Design of Street Reconstruction Project – Zones C & F Civil Works Engineers (CWE) appreciates the opportunity to submit this proposal. Our proposed team prides themselves with quality, service, and expertise in the design of street rehabilitation projects. Our well-qualified team has worked together previously on similar projects and has ample resources ready to deliver this project.

Since 2020 until currently, our team has been working together on the Street Reconstruction Project – Zones C&F in the City of Lomita and therefore, we are knowledgeable of the City’s staff, procedures, and standards.

The civil engineering services required for this project align perfectly with our recent experience and capabilities.

We specialize in street improvement projects for public agencies and will utilize our knowledge from previous street reconstruction projects to your benefit. Our team is augmented with subconsultants for surveying and pavement analysis with whom we have previously worked. Our Project Team is:

Civil Works Engineers Project Management, Roadway Design, Utility LaBelle Marvin Geotechnical Engineering & Pavement Evaluation Andrade Riehle Surveying, Base Mapping
CWE provides senior-level engineering insight on every project ensuring the City our collected experience and knowledge is applied to this project’s construction documents. We meet the selection criteria as follows:
➢ Our Project Team is well qualified with extensive roadway rehabilitation design experience ➢ We have recent experience in performing similar design work on projects for public agencies ➢ Our Project Manager has designed pavement rehabilitation for 120 streets through 22 construction contracts ➢ Our proposed plan identifies the objectives/tasks of the RFP and uses the knowledge from previous experience ➢ CWE’s fees are very competitive within the industry
We are committed to providing the City with high quality work, personalized service, and timely delivery for the design of this reconstruction project. We look forward to the opportunity to provide our services to the City of Lomita. We acknowledge receipt of the City’s Addendum No. 1 for this RFP dated March 2, 2022. I am the authorized person to negotiation the agreement with the City. If you have any questions or require additional information, please contact me.

Sincerely,
Marie Marston
President
[email protected]
Tuesday, July 07, 2026 Reg CC MTG, Page *237

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
2 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com Section 2: Qualifications and Experience
CWE has successfully completed numerous street pavement reconstruction projects some of which are shown in the table below. As this project also involves ADA, we have included examples for those tasks also.

AGENCY AGENCY CONTACT PROJECT NAME WORK COMPLETED START DATE
END
DATE
Completed
on Budget
Street Reconstruction
City of
Laguna
Niguel
Jacki Scott
(949) 362-4377
[email protected]
30111 Crown Valley Parkway
Laguna Niguel, CA 92677
Alicia Parkway
and Marina Hills
Drive Resurfacing
Project
Pavement Rehab
Design, Sidewalk
Reconstruction, ADA
Compliance, Traffic
Signal Modifications,
Specs, Cost Estimate
2021 Ongoing N/A
City of
Tustin
Joann Wu
(714) 573-3157
[email protected]
300 Centennial Way
Tustin, CA 92780
2021-2022
Maintenance for
Roadway and
Sidewalk – Zone
3 (64 Streets)
Pavement Rehab
Design, Sidewalk
Reconstruction, ADA
Compliance, Specs,
Cost Estimate
2021 2022
(PS&E
compl
eted)
Yes
City of
Lomita
Mondher Saied
(310) 325-7110 x110
[email protected]
24300 Narbonne Avenue
Lomita, CA 90717
2020-2021 Street
Reconstruction
Project – Zones C
& F (20 Streets)
Pavement Rehab
Design, ADA
Compliance, Specs,
Cost Estimate
2020 2022
(PS&E
compl
eted)
Yes
City of San
Gabriel
(Szeka) Angela Cheng
(626) 308-2825
[email protected]
425 S. Mission Drive
San Gabriel, CA 91776
Great Street
Project (18
Streets)
Pavement Rehab
Design, ADA
Compliance, Specs,
Cost Estimate
2017 2020 Yes
City of
Newport
Beach
Patricia Kharazmi
(949) 644-3344
[email protected]
100 Civic Center Drive
Newport Beach, CA 92660
MacArthur Blvd
& University
Avenue
Pavement
Rehabilitation
Pavement Rehab
Design, Specs, Cost
Estimate, WQMP,
Caltrans Permit
2017 2019 Yes
City of
Newport
Beach
Patrick Arciniega
(949) 644-3347
[email protected]
100 Civic Center Drive
Newport Beach, CA 92660
Dover Drive
Rehabilitation &
Streetscape
Improvements
Street & Rehab Design,
Landscape, Signal,
Signing, Striping,
Caltrans Permit, Water
Quality, Estimate,
Specs
2015 2017 Yes
City of
Yorba Linda
Fredy Castillo
(714) 961-7170
[email protected]
4845 Casa Loma Avenue
Yorba Linda, CA 92886
Annual Pavement
Preservation
Program
(10 streets)
Pavement Rehab
Design, Striping, ADA
Compliance
2015 2016 Yes
City of La
Mirada
Gary Sanui
(562) 902-2373
[email protected]
13700 La Mirada Boulevard
La Mirada, CA 90638
Neighborhood
Streets
Rehabilitation
(38 streets)
Pavement Rehab
Design, Parkway
Repair, Storm Drain
Rehab, Specs, Estimate
2014 2015 Yes
Tuesday, July 07, 2026 Reg CC MTG, Page *238

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
3 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com City of
Yorba Linda
Jacki Scott, now at City of Laguna
Niguel
(949) 362-4377
[email protected]
30111 Crown Valley Parkway
Laguna Niguel, CA 92677
City Wide
Pavement
Rehabilitation
(49 streets)
(multi-year
contract)
Pavement Rehab
Design, ADA
Compliance, Specs,
Cost Estimate
2009 2015 Yes
ADA
Caltrans
District 12
Naser Saleh
(657) 328-6089
[email protected]
1750 E 4th St #100
Santa Ana, CA 92705
Huntington
Street at Pacific
Coast Highway
Civil Design, ADA
Compliance,
Pedestrian Detours
2016 2017 Yes
Caltrans
District 12
Christopher Le
(657) 328-6113
[email protected]
1750 E 4th St #100
Santa Ana, CA 92705
Imperial Highway
(SR 90) ADA Curb
Ramps and
Driveways
Upgrade
Civil Design, ADA
Compliance
2016 2017 Yes
Section 2.1: References
The following representative projects demonstrate our street reconstruction qualifications similar to that required for the Street Reconstruction Project – Zone G. References are given for the project samples.

Alicia Parkway and Marina Hills Drive Resurfacing Project Client: City of Laguna Niguel
Address: 30111 Crown Valley Parkway, Laguna Niguel, CA 92677 Contact: Jacki Scott
Email: [email protected]
Phone: (949) 362-4377
Completion: Ongoing
City desired to rehabilitate Alicia Parkway (7,100’) from Highland Avenue to Crown Valley Parkway and Marina Hills Drive (6,550’) from Niguel Road to Golden Lantern. 15 and 16 non-ADA compliant curb ramps along Alicia Parkway and Marina Hills Drive, respectively were updated to ADA standards. The project also included traffic signal modification plans to add video/radar detection system to 4 intersections. Other project services included field review, surveying, geotechnical investigations, traffic index calculations, pavement analysis, geotechnical report, utility adjustments, striping design (adding buffered bike lane), final PS&E, and bid document preparation. 2021-2022 Annual Maintenance for Roadway and Sidewalk – Zone 3 Client: City of Tustin
Address: 300 Centennial Way, Tustin, CA 92780
Contact: Joann Wu
Email: [email protected]
Phone: (714) 573-3157
Completion: Ongoing with Final PS&E Recently Submitted
Civil Works is providing pavement rehabilitation and reconstruction design services for 64 streets (9.4 miles) including sidewalk, driveway, and drainage improvements at the NW corner of the El Camino Real and Browning Avenue intersection. 4 streets are major streets, 3 streets are alleys, and 57 streets are local streets. The Tuesday, July 07, 2026 Reg CC MTG, Page *239

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
4 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com project is divided into preliminary and design phases. The preliminary phase included field reviewing and marking all 64 streets for damage/lifted sidewalk, curb ramps, and localized damage/cracking AC areas and preparing the preliminary project cost estimate. The design phase included the preparation of PS&E. The project included surveying, pavement investigations and analysis, geotechnical report, and bid document preparation. 2020-2021 Street Reconstruction Project, Zones C and F
Client: City of Lomita
Address: 24300 Narbonne Avenue, Lomita, CA 90717
Contact: Mondher Saied
Email: [email protected]
Phone: (310) 325-7110 x110
Completion: Ongoing with Final PS&E Recently Submitted
Provided pavement rehabilitation and reconstruction design services for 20 streets (2.2 miles) within the City. The 20 streets are located primarily in Zones C and F which are residential and commercial areas of the City.

The project also included 37 curb ramp reconstructions, aesthetic upgrades at Lomita Boulevard/Narbonne Avenue intersection (this task is currently on hold), existing storm drain condition review at Lomita Boulevard/Narbonne Avenue and Moon Avenue/247th Street intersections. Other project services included, field review, surveying, geotechnical investigations, pavement analysis, geotechnical report, utility adjustments, striping, preparation of exhibits for staff presentation at City council meeting, final PS&E, bidding document preparation, and construction support. La Belle Marvin performed the pavement investigation needs and Chris Riehle of Andrade Riehle (formerly at Psomas) performed surveying needs for this project.

Great Streets 2017-2019 Pavement Rehabilitation Improvements Design Project Client: City of San Gabriel
Address: 917 E. Grand Avenue, San Gabriel CA 91778
Contact: Angela Cheng
Email: [email protected]
Phone: (626) 308-2825
Completion: 2020
In this project, the City identified two phases with 9 streets in each phase requiring complete reconstruction. Civil Works provided design services for the pavement rehabilitation and reconstruction of 18 streets (3.6 miles). The 18 streets are located primarily in residential and commercial areas of the City. Since most of 18 streets had not been rehabilitated for more than 20 years, the existing roadway asphalt exhibited signs of various asphalt distress including block, transverse, longitudinal, map, and alligator cracking.

The project included field review, surveying, geotechnical investigations, pavement analysis, geotechnical report, predesign report, ADA ramp reconstruction, sidewalk reconstruction, striping, final design including plans, specifications, and estimates, bidding document preparation, and bidding and construction support. The analysis included review of full depth reconstruction with cement stabilized or recycled asphalt concrete layers with an option for cold central plant recycling (CCPR). The City selected AC over cement stabilized pulverized base (CSPB). Phase 1 was estimated at $1.69 million and the range of bidders in July 2018 was from $1.45 to $1.92 million. Phase 2 was estimated at $2.34 million and the range of bidders in July 2019 was from $1.44 to $3.50 million.

Tuesday, July 07, 2026 Reg CC MTG, Page *240

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
5 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com MacArthur Boulevard & University Drive Pavement Rehabilitation Client: City of Newport Beach
Address: 100 Civic Center Drive, Newport Beach, CA 92660 Contact: Patricia Kharazmi
Email: [email protected]
Phone: (949) 644-3344
Completion: 2019
The City desired to improve the wearing surface of MacArthur Boulevard and University Drive and identified the project through their Pavement Management Program indications. The rehabilitation extended on MacArthur Boulevard from Ford Road / Bonita Canyon Drive to the SR-73 (4,050’) and on University Drive from Jamboree Road to the east side of the SR-73 northbound ramps (2,450’). The City also desired to reconstruct deteriorated concrete flatwork, upgrade pedestrian facilities to ADA and restripe using the new 6” stripes with a slightly changed cross section.

After preparation of the Pavement Investigation Reports, the agreed upon pavement rehabilitation strategy on MacArthur Boulevard was to use 2” asphalt rubber hot mix (ARHM) over 4” base for a 10-15 year service life for the section from Bison to SR-73 and 2” ARHM over 1.5” base from Ford Road to Bison. On University Drive, we examined an alternative approach for a test pilot program using fiber for a portion of the length. Upon coordination with the fiber manufacturer however, it was decided this was too expensive, so it was revised to a conventional structural section. Most of the section was constructed using 2” ARHM over 1.5” base providing a 20-year design life.

We prepared plans for pavement rehabilitation including 50’ cross sections and plan and profile. A Caltrans permit and traffic handling plans within Caltrans jurisdiction were prepared for the work that extended traffic handling onto their SR-73 facilities. The project also involved field review, surveying, geotechnical investigations, utility coordination, base plan development, pavement analysis, stage construction and traffic handling, traffic detour, street improvement design, signing and striping, specifications, cost estimate, and construction support. The project was successfully constructed. La Belle Marvin performed the pavement investigation needs for this project.

Dover Drive Improvements Pavement Rehabilitation and Streetscape Improvements Owner/Client: City of Newport Beach
Address: 100 Civic Center Drive
Newport Beach, CA 92660
Contact: Patrick Arciniega
Email: [email protected]
Phone: (949) 644-3347
Completion: 2017
A major Orange County Sanitation District aged trunk line sewer was replaced within Dover Drive which caused significant damage to the street surface. As a result, the City initiated a street improvement project with along Dover Drive and Westcliff Drive to improve the pavement and also to improve the aesthetics. The project involved the rehabilitation of the two existing roadways and construction of new and in some locations, widened landscaped medians. The improvements on Dover Drive extend between Coast Highway and Irvine Avenue, approximately 1.4 miles and on Westcliff Drive from Dover Drive to Irvine Avenue. A change in aesthetics was also requested by the City and therefore, our team developed alternative landscape palettes from which the City could choose the preferred new look. The project additionally included curb ramp improvements, traffic signal upgrades, traffic handling storm drain catch basin upgrades, and new irrigation and landscaping. Coordination and an Tuesday, July 07, 2026 Reg CC MTG, Page *241

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
6 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com encroachment permit were necessary from Caltrans for the work on Dover Drive at the intersection with Pacific Coast Highway. We coordinated with the existing utility companies including AT&T, City of Newport Beach water, The Gas Company, SCE, OCSD, and Time Warner.

City Wide Pavement Rehabilitation
Owner/Client: City of Yorba Linda
Address: 30111 Crown Valley Parkway
Laguna Niguel, CA 91677
Contact: Jacki Scott (now at City of Laguna Niguel)
Email: [email protected]
Phone: (949) 362-4386
Completion: 2009, 2010, 2011, 2015
As part of our on-call contract, Civil Works prepared four sets of construction documents over four different fiscal years for the pavement rehabilitation of multiple residential streets throughout the City. In 2009 the rehabilitation included six streets, in 2010, seven streets, and in 2011, 26 streets were included within the project. In 2015, the project included a slurry seal or grind/overlay for 10 streets. Plans included patch repair of damaged and failed pavement areas, repair of damaged parkway improvements, grinding and pavement overlay. All projects were successfully constructed.

Neighborhood Streets Pavement Rehabilitation (38 Streets) Owner/Client: City of La Mirada
Address: 15515 Phoebe Avenue
La Mirada, CA 90638
Contact: Gary Sanui, Public Works Manager
Email: [email protected]
Phone: (562) 902-2373
Completion: 2015
The project involved planning pavement repair and rehabilitation, parkway repair, and storm drain rehabilitation for 38 residential streets.

The intent of the project was to identify and quantify areas of distressed asphalt concrete pavement, determine method of asphalt concrete pavement rehabilitation, identify, and quantify areas of damaged or lifted concrete sidewalk and damaged, lifted, or depressed curb and gutter. These were summarized in a written report providing recommendations to repair the distressed pavement (typically dig-outs), method of pavement rehabilitation (slurry seal, grind and overlay, pavement reconstruction), and method of curb and gutter and sidewalk repair (grinding tripping hazards, remove and replacement).

The project included video inspection of the existing CMP storm drains and subsequent recommendations.

Rehabilitation involved installing liners rather than replacement with RCP. We prepared the construction plans, specifications, bid list and construction estimate to complete the rehabilitation work.

Idaho Street, Montana Avenue & Washington Street Pavement Rehabilitation
Owner/Client: City of Buena Park
Address: 6650 Beach Boulevard
Buena Park, CA 90622
Contact: Wood Nousome (retired), for questions please
contact Nabil Henein, Public Works Director
Email: [email protected]
Tuesday, July 07, 2026 Reg CC MTG, Page *242

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
7 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com Phone: (714) 562-3678
Completion: 2014
The project involved rehabilitation of three adjoining streets surrounded by residential homes and an elementary school.

Rehabilitation involved two different methods: grind and overlay or removal and reconstruction. The scope also included repair of sidewalks, curb and gutter, and driveway approaches.

Section 2.2: Project Team
Civil Works Engineers, Inc. is a professional civil engineering consulting firm formed in 2005 and based in Costa Mesa, California. Our staff has a tremendous amount of experience preparing preliminary and final civil and traffic engineering for roadway improvements for public agencies meeting all requirements. We have a wide variety of transportation experience that encompasses civil and traffic roadway planning and design for improvement projects, ranging among rehabilitation projects, roadway widenings, roadway narrowings, intersection improvements, and interchange improvements projects. CWE has completed 153 street rehabilitation projects in our 16-year history for 12 different agencies.

LaBelle Marvin, Inc. (LMI) is a distinguished full-service pavement engineering firm situated in southern California, with over 46 years of experience in all pavement related projects serving local, state, and national clients. LMI offers the latest in pavement engineering services with their innovative techniques utilized to test, analyze and design all pavement related projects with their investigative services both in the field and in the laboratory by the utilization of their Falling Weight Deflectometer (FWD), Ground Penetrating Radar (GPR), materials laboratory and their certified technical and engineering staff.

Andrade Riehle Land Surveying, founded in 2021, is a local professional land surveying and mapping firm based in Laguna Beach, California. The owners, Tony Andrade and Chris Riehle, are both licensed professional land surveyors and bring a collective 35+ years of experience in the surveying and mapping industries. Andrade Riehle Land Surveying specializes in topographical surveys, boundary surveys, ALTA/NSPS Surveys, right-of-way engineering, aerial mapping ground control, final map preparation and construction staking using both GPS and conventional surveying equipment.

Tuesday, July 07, 2026 Reg CC MTG, Page *243

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
8 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com The experience and qualifications of personnel assigned to this project is detailed below.

RICKY CHAN, PE, TE, PTOE, Project Manager / Project Engineer RELEVANT PROJECTS:

Alicia Parkway and Marina Hills Drive Resurfacing Project, City of Laguna Niguel.

Project Manager to provide rehabilitation and reconstruction design services for Alicia Parkway (7,100’) from Highland Avenue to Crown Valley Parkway and Marina Hills Drive (6,550’) from Niguel Road to Golden Lantern. The project included adding video/radar detection system for 4 intersections, field review, surveying, geotechnical investigations, traffic index calculations, pavement analysis, geotechnical report, utility adjustments, striping design (adding buffered bike lane), final PS&E, bidding document preparation, and construction support.
2021-2022 Annual Maintenance for Roadways and Sidewalks, City of Tustin. Project Manager to provide pavement rehabilitation and reconstruction design services for 64 streets (9.4 miles) and sidewalk, driveway, and drainage improvements. The design phase included the preparation of PS&E for the project. The project included surveying, geotechnical investigations, pavement analysis and report and PS&E. 2020-2021 Street Reconstruction Project, Zones C & F, City of Lomita. Project Manager providing pavement rehabilitation and reconstruction design services for 20 streets (2.2 miles) within the City. The project also included 37 curb ramp reconstructions, field review, surveying, geotechnical investigations, pavement analysis, geotechnical report, utility adjustments, striping, and final PS&E.

Great Streets Project 2017-19, City of San Gabriel. Project Manager / Project Engineer. Pavement rehabilitation and reconstruction design services for 18 streets (3.6 miles) over two phases/construction document packages.

MacArthur Boulevard & University Drive Pavement Rehabilitation, City of Newport Beach. Project Manager / Project Engineer. This rehabilitation design project extends on MacArthur Boulevard from Ford Road / Bonita Canyon Drive to the SR-73 and on University Drive from Jamboree Road to the SR-73 northbound ramps.

Pacific Coast Highway (SR-1) Roadway Preservation Project in Two Locations, from Vista Del Sol to 7th Avenue in Laguna Beach, and from Crescent Bay Drive to Newport Coast Drive, City of Newport Beach. Project Engineer. Prepared final TMP, utility conflict maps, pavement delineation plans, sign plans, stage construction and traffic handling plans, SWDR, specifications, quantities, and estimates.

AVAILABILITY: 65%
TENURE AT CWE: 5 yrs
REGISTRATIONS:

Professional Engineer
(California), #71389
Traffic Engineer, #2673
Professional Traffic
Operations Engineer,
#3685
EDUCATION:

B.S. in Civil Engineering
University of California,
Irvine, 2000
KEY STRENGTHS:
• 22 years of experience in roadway, traffic, and municipal engineering projects • Well-rounded experience in many aspects of street design projects including roadway geometrics, traffic signals, signing and striping, construction staging and traffic handling, and utility impacts
• Adept at agency coordination among cities, other local agencies, and other project stakeholders
Tuesday, July 07, 2026 Reg CC MTG, Page *244

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
9 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com MARIE MARSTON, PE, Principal-In-Charge, QA/QC Manager
RELEVANT PROJECTS:

Alicia Parkway and Marina Hills Drive Resurfacing Project, City of Laguna Niguel.

Principal in Charge/QC Manager. Pavement rehabilitation and reconstruction design services for Alicia Parkway (7,100’) from Highland Avenue to Crown Valley Parkway and Marina Hills Drive (6,550’) from Niguel Road to Golden Lantern. 2021-2022 Annual Maintenance for Roadways and Sidewalks, City of Tustin.

Principal in Charge/QC Manager. Pavement rehabilitation and reconstruction design services for 64 streets (9.4 miles) and sidewalk, driveway, and drainage improvements.
2020-2021 Street Reconstruction Project, Zones C & F, City of Lomita. Principal in Charge/QC Manager. Pavement rehabilitation and reconstruction design services for 20 streets (2.2 miles) within the City including 37 curb ramp reconstructions.

Great Streets Project 2017-19, City of San Gabriel. Principal in Charge/QC Manager.

Pavement rehabilitation and reconstruction design services for 18 streets (3.6 miles) over two phases/construction document packages.

MacArthur Boulevard & University Drive Pavement Rehabilitation, City of Newport Beach. Principal in Charge / QC Manager. This rehabilitation design project extends on MacArthur Boulevard from Ford Road / Bonita Canyon Drive to the SR-73 and on University Drive from Jamboree Road to the SR-73 northbound ramps.

Neighborhood Street Rehabilitation, City of La Mirada. Principal in Charge /QC Manager. Prepared final construction plans, specifications, bid list and construction estimate for rehabilitation work for 38 residential streets including parkway repair and storm drain rehabilitation.

Dover Drive Improvements, City of Newport Beach. Principal in Charge/QC Manager.

Rehabilitation design and new landscaped center medians and widening of existing landscaped center medians, curb ramp improvements, traffic signal upgrades, catch basin upgrades, and new irrigation and landscaping.

Kass Drive/Thomas Street/Page Street Pavement Rehabilitation, City of Buena Park.

Principal in Charge/QC Manager. Prepared the rehabilitation design for three severely deteriorated industrial area streets.

AVAILABILITY: 20%
TENURE AT CWE: 17 yrs
REGISTRATIONS:

Professional Engineer
(California), #38798
SWPPP Developer &
Practitioner, #23572

COMMUNITY SERVICE
AFFILIATIONS:

Harbor Commission – City
of Newport Beach Council
Appointed Commissions,
2019 – present
Parks, Beaches &
Recreation Commission –
City of Newport Beach,
2006-2017
General Plan Advisory
Committee – City of
Newport Beach Council
Appointed Member, 2003-
2006
EDUCATION:

B.S. in Civil Engineering
Oregon State University,
1980
M.B.A., University of
California, Irvine, 1988
KEY STRENGTHS:
• 40+ year career of street and site planning, design, and construction • Variety of experience ranging from small to large street projects • Experience working with both the public and private sector including cities, counties, state agencies, federal agencies, school districts, universities, and developers
Tuesday, July 07, 2026 Reg CC MTG, Page *245

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
10 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com FRANÇOIS ZUGMEYER, PE, Senior Civil Engineer
RELEVANT PROJECTS:
2020-2021 Street Reconstruction Project, Zones C & F, City of Lomita. Senior Civil Engineer. Provided pavement rehabilitation and reconstruction design services for 20 streets (2.2 miles) within the City including 37 curb ramp reconstructions.

MacArthur Boulevard & University Drive Pavement Rehabilitation, City of Newport Beach. Senior Manager / Project Engineer. This pavement rehabilitation project is to extend on MacArthur Boulevard from Ford Road / Bonita Canyon Drive to the SR-73 (4,050’) and on University Drive from Jamboree Road to the east side of the SR-73 northbound ramps (2,450’) CWE prepared plans for pavement rehabilitation including 50’ cross sections and plan and profile.

Bastanchury Road and Rose Drive Storm Drain Improvements, City of Yorba Linda.

Project Engineer. Prepared a preliminary drainage report and conducting a hydrology study for all concepts and participated in the preparation of PS&E documents.

Rosecrans/Marquardt Grade Separation, City of Santa Fe Springs. Project Engineer. Responsible for preparation of hydrology study, drainage report and storms drain plans for the project. Storm water quality requirements included design of BMPs and preparation of a Standard Urban Storm Water Mitigation Plan (SUSMP) in accordance with County of Los Angeles requirements.

Residential Street Pavement and Parkway Rehabilitation, City of Costa Mesa. Senior Civil Engineer. Responsible for the preparation of final design plans for pavement rehabilitation of existing residential streets and repair of damaged curb and gutter, sidewalk, cross gutters, driveways, and curb ramps. Prepared detailed report of final parkway repairs and atlas maps for pavement rehabilitation to be included in the project specifications.

Pacific Coast Highway (SR-1) and Huntington Street Intersection Improvements, City of Huntington Beach.

Senior Engineer. Design services included the preparation of street improvement plans, detail plans, signing and striping plans, pedestrian detour plans, construction cost estimate, specifications, and coordination with Caltrans.

Kass Drive/Thomas Street/Page Street Pavement Rehabilitation, City of Buena Park. Project Engineer. These industrial area streets were highly deteriorated. Pavement rehabilitation involved three different methods – overlay, removal and reconstruction and reconstruction by cement treatment of existing base materials.

Included curb ramp construction and parkway repair. Prepared pavement rehabilitation plans, striping plans, traffic handling plans, specifications and estimate.

KEY STRENGTHS:
• 45+ year career of street and site planning, design, and construction • Heavily experienced in planning and design of street improvements • Experience includes right of way engineering, utilities, construction staging and traffic handling, detours, signing, and pavement delineation • Significant experience in projects requiring ADA compliance • Experience includes construction staging and utility coordination and involvements
AVAILABILITY: 50%
TENURE AT CWE: 17 yrs
REGISTRATIONS:

Professional Engineer
(California), #31046
EDUCATION:

Civil Engineering
E.N.S.A.I., Strasbourg,
France, 1972
Tuesday, July 07, 2026 Reg CC MTG, Page *246

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
11 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com STEVE MARVIN, PE, Pavement Engineer
RELEVANT PROJECTS:
2020-2021 Street Reconstruction Project, Zones C & F, City of Lomita. Pavement Engineer. LMI performed a thorough structural investigation of the roadway to determine specific needs and explore rehabilitation alternatives.

Cameo Highland Residential, Newport Beach. Pavement Engineer. LMI performed a thorough structural investigation of the roadway to determine specific needs and explore rehabilitation alternatives.

Camino Capistrano & Avenida Aeropuerto, San Juan Capistrano. Pavement Engineer.

LMI performed a thorough structural investigation of the roadway to determine specific needs and explore rehabilitation alternatives.

CHRISTOPHER RIEHLE, PLS, Survey Manager
RELEVANT PROJECTS:
2020-2021 Street Reconstruction Project, Zones C & F, City of Lomita. Survey Manager. Photogrammetric Mapping, Centerline and ROW basemapping and topographic surveying in support of this 20 street (2.2 miles) project.

City of Los Angeles, Complete Streets Program (TOS 38), Los Angeles. Office Surveyor.

Mapping included location of all surface visible improvements, including utilities, driveways, curbs, flowlines, and ramps over 22 miles of roadway.

Orange County Fair and Event Center, Costa Mesa. Project Surveyor. Aerial Mapping collected all visible features for roadway, utilities, and cultural items in support of the conventional ground survey. DTM break lines and mass points supplemented select planimetric features for triangulation of a surface model and ultimately the creation of the 1’ contours for the entire site.

AVAILABILITY: 50%
TENURE AT Andrade
Riehle:
1 yr (19 yrs at other
firms)
REGISTRATIONS:

Professional Land
Surveyor (California),
#9453
EDUCATION:

B.S. in Geography, GIS
Minor, California
Polytechnic University,
Pomona, 2002
Steven R. Marvin, P.E., has more than forty-six years of experience in the area of pavement engineering. Mr. Marvin oversees final quality control for all data and inspections performed by LMI operations of the asphalt concrete laboratory, field sampling, pavement evaluations, and testing of roadway, aggregate and subgrade materials, soil stabilization design and evaluation, pavement design, rehabilitation design for existing pavement systems, and complete investigations of material and/or design caused pavement failures.

AVAILABILITY: 20%

TENURE AT LABELLE
MARVIN: 37 yrs
REGISTRATIONS:

Professional Civil
Engineer, (California),
#30659
EDUCATION:

BSCE, California State
University, Long Beach
Chris Riehle has 19 years of experience in a wide array of survey and mapping disciplines, including ALTA/NSPS Land Title Surveys, boundary analysis, topographic mapping, preparation and review of parcel maps, final maps and Records of Survey, lot line adjustments, legal description preparation, analysis and mapping of rights-of-way and easements, and extensive GPS post-processing and geodetic control network establishment throughout California.

Tuesday, July 07, 2026 Reg CC MTG, Page *247

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
12 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com Section 2.3: Previous Experience working with Subconsultants Civil Works Engineers has worked with our subconsultants recently on the following projects:

La Belle Marvin –
City of Lomita - 2020-2021 Street Reconstruction Project, Zones C & F City of Tustin - 2021-2022 Annual Maintenance for Roadways and Sidewalks City of Newport Beach – MacArthur Boulevard & University Drive Pavement Rehabilitation Andrade Riehle Land Surveying (Chris Riehle worked with us while at a previous employer and recently started his own surveying firm) –
City of Lomita - 2020-2021 Street Reconstruction Project, Zones C & F Section 3: Scope of Work and Project Approach
Section 3.1: Project Understanding
AC Reconstruction and AC Overlay
As described in the Request for Proposals, the City of Lomita desires to rehabilitate the pavement of twenty (20) street segments within the City. Listed below on Table 1-Project Limits, is a summary of the proposed project street limits with a total of 12,396 linear feet (2.35 miles) of reconstruction.

Table 1 – Project Limits
No. STREET EXTENT
STREET
WIDTH
(ft)

SEGMENT
LENGTH
(ft)
AC

OVERLAY
AC RECONSTRUCT
# TOTAL
CORES
1 Walnut St Northern City Border to 241st St 40 507 X 2 2 240th St Eshelman Ave to Walnut St 30,36 841 X 2
3 241st St Western Street End to Walnut St 30 749 X 2
4 Callison St Stanhurst Ave to Walnut St 30 483 X 2
5 Stanhurst St 241st St to Callison St 30 500 X 2
6 Falena Ave Northern City Border to 247th St 34 459 X 2 7 247th Pl Western Street End to Eastern City
Border 30 760 X
2 8 Walnut St Lomita Blvd to 253rd St 36 1,445 X 2
9 Ebony Ln Lomita Blvd to 252nd St 56 787 X 2
10 252nd St Western Street End to Ebony Ln 30 190 X 1
11 Alcor St Western Street End to Walnut St 36 259 X 1
12 253rd Pl Eshelman Ave to Walnut St 26 735 2
13 Walnut St 241st St to Turrell St 40 1,332 X 2
14 Turrell St Western Street End to Walnut St 26 501 X 2 15 Nordman St Western Street End to Walnut St 30 503 X 1 Tuesday, July 07, 2026 Reg CC MTG, Page *248

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
13 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com 16 246th St Falena Ave to Eastern City Border 34 650 X 2 17 247th St Abita Ave to Walnut St 30 264 X 1
18 Abita Ave 247th St to Southern Street End 30 204 X 1 19 248th St Western Street End to Eastern City
border 29 487 X
2 20 Abony Ln 252nd St to Walnut St 56 740 X 2
TOTAL 12,396 35
AC reconstruction will extend from curb-to-curb with alternative treatment such as conventional hot mix asphalt (HMA), asphalt rubberized hot mix (ARHM), cold in place recycling, base reconstruction, etc. Pavement repair strategies and methods will be evaluated to recommend an appropriate and cost-effective alternative for each street segment. It is not anticipated that street profiles would need to be modified.

The street improvements will also address the following as applicable for each street:
• Adjustments of manholes and utility valve covers
• Replacement of traffic signal loop detectors
• Replacement of striping, pavement markings and pavement markers The pavement investigation and report will be prepared to address each street segment and determine appropriate potential reconstruction alternatives. From this information, we will prepare a memo summarizing the alternatives and associated costs for the City to evaluate the repair options. Following the City’s review and approval of the preferred reconstruction approach, we will prepare design PS&E.

ADA Curb Ramps
Existing curb ramps not meeting current ADA requirements will be reconstructed as part of the street reconstruction. We have identified thirty-six (36) existing curb ramps in Zone G that will need reconstruction.

Table 2 below shows the locations of the non-ADA curb ramps.

Table 2 – Summary of Curb Ramp Work
No. LOCATIONS OF NON-ADA CURB
RAMPS

NUMBER OF NON-ADA

CURB RAMPS NEED

RECONSTRUCTION
1 Eshelman Ave & 242nd St 2
2 Eshelman Ave & Turrell St 2
3 Eshelman Ave & Lomita Blvd 4
4 Walnut St & April Ct 2
5 Walnut St & Callison St 2
6 Lomita Blvd & Walnut St 2
7 Lomita Blvd & Ebony Ln 3
8 Walnut St & Leola St 2
9 Walnut St & Eleanor Pl 2
10 Ebony Ln & 251st St 2
Tuesday, July 07, 2026 Reg CC MTG, Page *249

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
14 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com 11 Ebony Ln & 252nd St 2
12 Walnut St & Alcor St 2
13 Walnut St & 252nd St 2
14 Walnut St & 253rd St 2
15 Ebony Ln & 253rd St 2
16 Eshelman Ave & 252nd St 2
17 Eshelman Ave & 253rd St 1
TOTAL 36

Section 3.2: Scope of Work
Based on the RFP and field review of the project site, the following scope of services is presented for the PS&E.

Task 1 Meetings and Coordination
Task 2 Pavement Investigation and Analysis
Task 3 Plans, Specifications and Estimate (PS&E)
Task 4 Bid Package
Task 5 Bid and Construction Support
Task 1 – Meetings and Coordination
We anticipate five project meetings will be held during the project development as follows: kickoff meeting for overall coordination, establishment of project direction, scope, budget details, and schedule; second meeting (progress meeting) at 30% level of completion; third meeting (progress meeting) at 60% level of completion; fourth meeting (progress meeting) at 90% level of completion; and fifth meeting (progress meeting) at the 100% level of completion. The purpose of the progress meetings is to maintain communication with the City, discuss progress and ensure delivery on schedule, discuss specific issues, exchange information, and receive guidance and direction. Agendas and meeting minutes will be prepared.

This task also includes the project management and coordination efforts required among the project team throughout the project development.

Task 2 – Pavement Investigation and Analysis
Field sampling by pavement coring method shall be performed on each roadway segment. Each location will be located within the right wheel track, extending 4’ below the finish surface. All locations shall be backfilled and patched, per City of Lomita requirements.
• 35 total pavement core locations will be sampled including existing asphalt concrete and PCC layers, and the sampling of the underlying soils. Sample specimens shall be measured, labeled, and transported back to LMI’s Caltrans certified and AASHTO accredited laboratory for further analysis. See Table 1 in Section 3.1 “Project Understanding” for the number of pavement coring to be performed for each street. o All sampling operations shall comply with the City’s no fee encroachment permit requirements.

Tuesday, July 07, 2026 Reg CC MTG, Page *250

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
15 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com o Professional traffic control shall be provided per MUTCD standards. o Underground Service Alert will be notified and a meeting held, if requested, with concerned utilities to relocate test sites, as necessary.
o A core log and core location plan shall be included in the final report • Existing cross slopes, taken by digital smart level, shall be obtained at select locations in the field during the coring operations. Existing cross slopes shall be utilized to verify compliance with City standards.

Ground Penetrating Radar shall provide additional asphalt concrete thickness information on a continuous basis, providing up to 3 tests per linear foot, without the need to increase the proposed pavement coring efforts. This is a substantial cost saving to the City while providing greater information to our engineers. The measured asphalt concrete pavement thickness shall be mapped by depth and location and provided onto aerial imagery.

Subgrade soil samples taken in the field will be identified, labeled, and measured during the sampling process.

Data developed during the laboratory testing will be utilized to project probable field support conditions during construction and highlight where appropriate special care may be required during roadway preparation.

Evaluation of the present pavement thicknesses utilizing component analysis with R-value data will be combined with future traffic estimates (Traffic Index provided by City) for design and development of suitable, alterative replacement sections. Laboratory tests included within this investigation are as follows:
o Moisture Content Tests (CA 226): Subgrade soil samples taken in the field will be visually classified and the in-situ moisture content will be determined per sample location. o R-Value Tests (CA 301): Representative sample(s) will be selected and tested for R-Value (soil strength) determinations on the subgrade.

LaBelle Marvin shall perform a site evaluation of site conditions. Conditions shall be recorded for the purposes of compiling the recommendation plans and report. Compare field conditions with thickness data obtained during core sampling and GPR scanning. We will compare field conditions with component analysis based on laboratory subgrade strength testing for the purpose of providing needed structural improvements.

Engineered recommendations for alternate methods of pavement rehabilitation, and/or reconstruction, (where conditions dictate) inclusive of a pulverization alternative, where feasible, will be developed based of the materials investigation. Pavement will be designed in accordance with the City’s design standards and California Design Manual for Flexible Pavement and Roadway Rehabilitation. Designs shall be based on City provided traffic index and design life criteria. Final rehabilitation concept plans of each strategy will be created in AutoCAD and produced onto color media 11” x 17”, suitable for conveying alternative methods of improvement.

A final report shall be provided inclusive of all data developed during the investigation with the most costeffective design rehabilitation alternatives, structural replacement sections for areas of reconstruction, material specifications, field, and laboratory test data.

Task 3 – Plans, Specifications and Estimate (PS&E)
Task 3.1 AC Reconstruction and AC Overlay
This task includes the preparation of construction plans. We have assumed we will prepare one set of plans for all 20 street segments. Aerial topographic survey mapping will be performed for all 20 street segments. The Tuesday, July 07, 2026 Reg CC MTG, Page *251

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
16 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com aerial survey mapping will be taken from right of way to right of way, and include right of way line, centerline, curb, and gutter, back of walk, surface utilities.

The plans related to pavement reconstruction will be prepared on 24” by 36” sheets using AutoCad Civil 3D 2022. The plan set is expected to include the following sheets. • Title sheet (1 sheet)
• Typical Sections (2 sheet)
• Layout Plans at 1” = 40’ (5 sheets) – including centerline and public right of way line • Curb Ramp Detail Sheets at 1”=10’ (4 sheets)
• Signing and Striping plans at 1” = 40’ (5 sheets) – includes signing, striping, pavement marking, pavement markers, painted curb length, and loop detectors Curb and gutter profiles are not typically prepared for a pavement rehabilitation project. Although full reconstruction may be needed for these streets, it is not anticipated that curb and gutter would need to be replaced and therefore, no roadway profiles are included in this proposal.

The roadway plans will include removals, pavement rehabilitation improvements and utility adjustments. Curb ramps to be modified will be shown. No improvements are expected to the concrete portions of the roadways, i.e., curb and gutter, sidewalk, bridges, bus stops, bus turnouts, etc. The design will be ADA compliant.

Striping sheets will be prepared to replace the striping following the pavement rehabilitation. Changes from the existing striping are not anticipated, however, the striping must be restored. Additionally, loop detector replacements will be shown on the striping sheets. Existing signing will be inventoried during our field review for ease in re-creation on the plans. Modifications to signs are not anticipated.

We will prepare technical specifications in Word in conformance to the latest editions of the Standard Specifications for Public Works Construction (Greenbook), City Standard plans, Standard Plans for Public Works Construction, State of California Department of Transportation (Caltrans) Standard Plans and Specifications, California Manual on Uniform Traffic Control Devices (CA MUTCD), incorporating City general conditions.

Task 3.2 ADA Curb Ramps
Thirty-six (36) non-ADA curb ramps, based on our Google map observation, to be reconstructed will be shown on the layout and curb ramp detail sheets with the type of ramp per APWA standard drawings. The layout plan will also include a tabulated list detailing the types of curb, locations, and materials.

Aerial survey will be performed on existing curb ramps and curb returns at each of the 36 curb ramp locations to assess their ADA compliance. The survey will include existing curb ramp, surface utilities, other topographic features, etc. that will provide constraints to the curb ramp design.

We will perform a field review of each street segment and curb ramp locations and take photographs. The photographs will document the before condition. We will also identify and note specific site constraints and existing conditions as observed. We will summarize any findings of difference between our visual review and the as-builts. As-builts are expected to be provided by the City.

Task 3.3 Engineer’s Estimate
Tuesday, July 07, 2026 Reg CC MTG, Page *252

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
17 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com The engineer’s quantity and cost estimate will be prepared in Excel spreadsheet at 60%, 90%, and 100% level of completion. The cost estimate informs the City of the upcoming financial obligation and provides the engineer’s estimate. The estimate will show quantities and unit prices for each work item along with appropriate mobilization and contingency costs including utility adjustments, tie out and resetting of survey monuments, record and filing of corner records for the monuments. We will research the latest unit prices available and consult with the City on specific prices and use our own information from other recent bids as well as City of Lomita and other city’s cost data as available to ensure the unit prices are current.

We anticipate submittals of the plans at the 60%, 90%, and 100% level of completion. Review comments from the previous submittal will be addressed and responses will be provided with the latest submittal.

Task 3.4 Utility Research, Confirmation Letters, and Coordination Utility coordination can often be critical design function to ensure a smooth construction. If utility facilities are not identified, coordination is not made, and issues arise during construction it could cause a slow-down or stoppage leading to change orders. This task involves more than the collection and mapping of facilities, it involves continuing our contact with the owners after their facilities are mapped and our design has been determined such that conflicts can be identified and coordination ensued to develop an appropriate action plan.

We would begin by making contact with all utility companies with facilities within the project limits to inform them of this project and obtain their as-built plans to verify locations, types, and sizes of facilities and include on our base map. While vertical information is many times unavailable, we would need to coordinate with the owners to understand their depths and whether the new structural sections would impact the facilities. Once the information is added to our base maps, we would forward them to the utility companies for verification.

Following confirmation of mapping, this task includes continued coordination and related follow-up with the affected underground and overhead utility companies regarding the specific impact locations. We would preliminarily determine any conflicts the improvements would have with the utilities and summarize the information on the plans. A log of all coordination and correspondence would be maintained throughout the project development. We anticipate the utility conflicts would be minimal, consisting primarily of adjustment to grade of surface manholes and valve covers. We would, however, review the limits of the new structural section with the depth information to confirm there are no vertical conflicts.

Costs associated with utility surface features adjustments to grade would be included in our estimate. We do not anticipate a need for determination of prior rights since relocations and modifications to existing utility facilities are unlikely. Potholing is not anticipated to be necessary. No separate utility plans are anticipated.

Design of the relocation or modification of facilities is not included.

Task 4 – Bid Package
We will prepare a bid package which includes the plans and technical specifications.

Using the cost estimate as a basis, we will determine which items in the cost estimate will be included as contract items in the bid list. We have found an essential part of the PS&E is preparing a bid list which references the specific Contractor’s payment clause. By doing this, we ensure that all bid items have a clear manner of payment. We cross check the construction plans, cost estimate and bid item list to ensure all items of work have a means of payment and are accounted for in the bid and quantity estimate even if some bid items include multiple items as it is possible that the engineer’s cost estimate and bid proposal may not list items in Tuesday, July 07, 2026 Reg CC MTG, Page *253

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
18 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com the same manner. It is also important to coordinate the method of payment, such as final pay items, partial pay items, lump sum items, etc.

Task 5 – Bid and Construction Support
We will provide professional support during bidding process and construction activities. We will perform the following activities as requested.
• Provide answers and information to bid questions or inquiry • Attend pre-bid meeting
• Attend pre-construction meeting
• Review construction submittals (shop drawing review)
• Respond to Request for Information (RFI)
• Assist in cost estimate and analysis for Contract Change Order (CCO) Optional Tasks
Optional Task #1 - Conventional Ground Survey for four (4) streets Should the extent of reconstruction require the need for more precise plans for curb, gutter, and driveway replacement, we have included an optional task for additional conventional ground survey for four streets that would need curb, gutter, and driveway replacement. The streets included 240th Street from Eshelman Avenue to Walnut Street, 241st Street from Western Street End to Walnut Street, Callison Street from Stanhurst Avenue to Walnut Street, and Stanhurst Avenue from 241st Street to Callison Street. We would research horizontal and vertical control and recover nearby monuments for the basis of our surveys. Elevations would be established by conventional leveling from nearby County benchmarks. During this survey task, additional points may be established to facilitate the survey. We would utilize the City or County’s offices to obtain corner records, street centerline ties, record maps, benchmarks, and GPS control data.

The ground topographic survey for these four streets could be proposed to take 50-foot interval survey cross sections as needed to produce the construction details. The survey would be taken from right-of-way to right of way and include flow line, top of curb, edge of gutter, back of walk, roadway crown, and surface utilities.

Optional Task #2 –Conventional Ground Survey for thirty-six (36) Curb Ramps We would survey the intersection curb returns for ADA compliance and reconstruction of the curb ramps at 36 curb ramp locations. The survey would include existing curb ramp, flow line, top of curb, gutter lip, back of walk, surface utilities within each curb return from BCR to ECR.

Exclusions from Scope of Work
• Roadway Profiles
• Drainage Study & Report
• Right of Way Engineering
• Utility Modification or Relocation Design (other
than adjustments to grade)
• Street Light Design
• Utility Potholing
• Mix Design for CSPB or CIR
• Traffic Study & Report
• Striping and Signing Modification
• Water Quality Documentation
• Environmental Services
• Traffic Signal Modification Design (temporary or
permanent)
• Plan Check / Permit Fees Cost
• Structure Modifications Design
• Private Property Owner Coordination &
Meetings
Tuesday, July 07, 2026 Reg CC MTG, Page *254

ENGINEERING DESIGN SERVICES FOR

STREET RECONSTRUCTION PROJECT - ZONES C & F
City of Lomita
18 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com

Section 3.3: Key Project Concerns to Address
Pavement Determination Approach
Challenge: Due to visual signs of extensive pavement distress, the existing condition on at least 8 street segments may require full depth reclamation due to extent and severity of damage. See the photo to the right for the street segment along Walnut Street between 241st Street and Turrell Street. The City will be interested in an efficient and economical solution for the 20-year design life.

Solution: Based on sampling from our field investigation, we will evaluate conventional pavement sections with varying combinations of thicknesses of AC over aggregate base as well as full depth asphalt. Due to the extent of existing roadway dig outs (exceeding 40%), other remediation strategies become more viable and cost effective and therefore, we will consider full-depth reclamation (FDR) and cold central plant recycling (CCPR) which would be a beneficial environmental approach to make use of existing material. Following the identification of possible structural sections, we will perform value engineering and confer with the City for the appropriate design.

Discrepancies between the City ADA Curb Ramp Assessment Report vs Site Conditions Challenge: Based on the experience from Zones C & F project, City provided an ADA curb ramp assessment report indicating 77 curb ramps were not ADA compliant within the project limits. After our site/curb ramp review on the 77 curb ramps, we determined that only 37 curb ramps were non-ADA compliant. 40 curb ramps ($6,000 construction cost for each ramp and $240,000 construction cost in total) were ADA compliant per the latest APWA Standard and did not need reconstruction. As such, the assessment report could be outdated and a similar situation could happen for this Zone G project.

Solution: In order to determine if the discrepancies between the City-provided assessment report and the site conditions, our project manager/ADA designer will perform site review on all the curb ramps in Zone G and determine and report to the City which ramps are ADA compliant or non-ADA compliant. Like we did on the Zones C and F project, we will provide our comments on the assessment report and present it to the City for review. See the photos below for snapshots of our comments on the assessment report from the Zones C & F project and the associated curb ramp. We believe our comments will bring value to the project and City and help City to avoid the unnecessary construction cost.

Curb ramp #32 assessment from assessment report and our comments:

Tuesday, July 07, 2026 Reg CC MTG, Page *255

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
19 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com Site Photo of Curb Ramp #32:

Summary of Geotechnical Report and Recommendations
Challenge: Each street segment will have its own geotechnical report and 3 to 4 recommended alternatives from the report. It will be time consuming for City to read through the reports and select the best alternative for each street.

Solution: To avoid the City staff going through each separate roadway report, we will provide a summary of the geotechnical report recommendations (summarizing all the report’s recommendations), our recommendations, and associated cost estimate for the City to review and make their pavement decision. See the example below from the Zones C & F project which demonstrates the summary information we will provide to the City.

Zones C & F Summary of geotechnical report recommendation and our recommendations:

Tuesday, July 07, 2026 Reg CC MTG, Page *256

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
20 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com Curb Ramp Reconstruction and Right of Way
Challenge: Confirming the existing right of way limits when performing curb ramp design is important to ensure the curb ramp construction will be within public right of way, staying out of private property.

Solution: We will perform centerline and right of way field survey and basemapping. We will put the right of way line on the curb ramp construction details so that the new curb ramp will be shown clearly within the public right of way.

See the curb ramp construction detail #26 on the right from the Zones C & F project clearly indicating the right of way line.

Section 3.4: Quality Assurance/Quality Control
To ensure that all deliverables will be free of errors, our Quality Assurance / Quality Control (QA/QC) program ensures correct and coordinated design documents.

Our QA/QC plan will include checking and cross-checking prior to each submittal. The QA/QC process begins at the onset of the project and will be in effect throughout the contract duration to meet the project and City’s guidelines and requirements during the project. Our reviewsinclude:

Inter-Discipline Review – Managers of each applicable discipline will review the plans, design and/or reports.

Tuesday, July 07, 2026 Reg CC MTG, Page *257

ENGINEERING DESIGN SERVICES FOR
STREET RECONSTRUCTION PROJECT – ZONE G
City of Lomita
21 3151 Airway Avenue, Suite T-1, Costa Mesa CA 92626
714.966.9060 p | 714.966.9085 f | www.civilworksengineers.com Coordination Review – The project manager will review the plans, specifications and reports for proper coordination, accuracy, and submittal standards. Coordination with other team members such as survey and geotechnical are performed to ensure consistency throughout the documents.

Submittal Review – An independent review of the plans, specifications and reports will be completed by the QA/QC manager prior to submittal to the City.

At final submittal, an additional cross-check is performed between the items and quantities in the bid list and that shown on the plans. Quality control is fundamental to Civil Works Engineers’ success to ensure the projects are constructible. Our Principal-In-Charge is a firm believer in ensuring quality before submittals are made.

Section 3.5: Document Control
For all of our projects, we have a typical in-house protocol which all our employees follow for project filing of cadfiles, design documents and reports, source documents, meeting minutes, quality control records, etc. As such, any employee can look up any project through the job number and find project details readily. We additionally have the ability to share our documents through online file transfer applications, particularly if the documents are large sized. We also prepare, generally on our larger projects, a deliverables list. This list identifies all documents that will be submitted and provides a space to record the submittal date, comments received date, and responses date for each item. Additionally, as stated above, for utility information, we keep a separate utility matrix noting the correspondence dates of requests and receipt of information, size, and type of utility present, and whether it has been identified as conflicting. During the kickoff meeting with the City, we will determine what documentation the City would like and coordinate to the needed level.

Tuesday, July 07, 2026 Reg CC MTG, Page *258
Act
ID Description Orig Dur Early Start Early Finish 18JUL 2022 25 AUG 2023 01 SEP 08 OCT 15 NOV 22 DEC 29 JAN 05 FEB 12 MAR 19 APR 26 MAY 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 06 13 20 27 03 10 17 24 01 08 15 22 Preliminary Engineering
100 Notice To Proceed 0 20JUL22105 Project Pre-Design Meeting & Site Walk 5 20JUL22 * 26JUL22110 Utility Investigation 40 20JUL22 13SEP22115 Research & Data Collection 5 27JUL22 02AUG22120 Design Field Survey & Base Mapping 20 27JUL22 23AUG22135 Pavement Investigation & Analysis 35 27JUL22 13SEP22 Plans, Specifications, & Estimates
205 Prepare 60% PS&E 25 24AUG22 27SEP22210 City Review - 60% PS&E 10 28SEP22 11OCT22215 Meeting with City 1 12OCT22 12OCT22220 Prepare 90% PS&E 20 28SEP22 25OCT22225 City Review 90% PS&E 10 26OCT22 08NOV22230 Meeting with City 1 09NOV22 09NOV22235 Prepare 100% PS&E Bid Package 10 26OCT22 08NOV22240 City Review 100% PS&E Bid Package 5 09NOV22 15NOV22245 City Approves PS&E 1 16NOV22 16NOV22 Bidding & Construction
305 Council Approve for Bid 0 15DEC22 *310 Bidding 25 15DEC22 18JAN23315 Contract Award 10 19JAN23 01FEB23320 Construction 80 02FEB23 24MAY23 Notice To Proceed
Project Pre-Design Meeting & Site Walk
Utility Investigation
Research & Data Collection
Design Field Survey & Base Mapping
Pavement Investigation & Analysis
Prepare 60% PS&E
City Review - 60% PS&E
Meeting with City
Prepare 90% PS&E
City Review 90% PS&E
Meeting with City
Prepare 100% PS&E Bid Package
City Review 100% PS&E Bid Package
City Approves PS&E
Council Approve for Bid
Bidding
Contract Award
Co
Start date 20JUL22Finish date 24MAY23Data date 20JUL22
© Primavera Systems, Inc.

CITY OF LOMITA

ZONE G STREET REONCONSTRUCTION REHABILITATION

CIVIL WORKS ENGINEERSPROJECT SCHEDULE
Early barCritical barStart milestone pointFinish milestone point Tuesday, July 07, 2026 Reg CC MTG, Page *259
CLIENT: City of Lomita Civil Works Engineers
PROJ: Street Reconstruction Project - Zone G PROJECT LABOR ESTIMATE DATE: 3/10/2022 (Revsied 4/22/2022)
M. Marston
Principal
F. Zugmeyer
Senior Drainage
Engineer
R. Chan
Project
Manager/Engineer
Senior Engineer
Staff Engineer
Designer
Administrative
Support
HOURS
CWE
LABOR

SUBTOTAL
SubConsultant -
Labelle Marvin
SubConsultant -
Andrade Riehle
Markup
TOTAL
Rate $165 $135 $135 $115 $100 $95 $65 5%
Task 1 Pre-Design Meeting
Kick-Off Meeting (1) 3 3 3 9 $1,185 $1,185
Progress Meetings (4) 6 12 9 27 $3,465 $3,465
Project Coordination 8 24 32 $4,560 $4,560
Subtotal 17 39 68 $9,210 $9,210
Task 2 Pavement Investigation and Analysis
Review Pavement Structural Investigation Report 2 8 10 $1,410 $39,900 $1,995 $43,305 Subtotal 2 8 10 $1,410 $39,900 $1,995 $43,305
Task 3 Plans, Specifications and Estimate (PS&E)
Task 3.1 AC Reconstruction and AC Overlay
Title Sheet (1) 1 1 8 10 $1,060 $1,060
Typical Section (2) 1 8 32 41 $4,285 $4,285
Layout Plans (5) 1 20 80 101 $10,465 $10,465
Curb Ramp Detail Sheets (4) 1 8 12 21 $2,385 $2,385
Signing and Striping Plans (5) 1 15 60 76 $7,890 $7,890 Specifications 4 16 20 $2,820 $2,820
Task 3.2 ADA Curb Ramps
Field Review 16 16 32 $3,680 $3,680
Survey (Aerial Survey for 20 streets and 36 curb
ramps) 1 6 2 9 $1,165 $37,000 $1,850 $40,015
Curb Ramp Design for 36 curb ramps to be
incorporated in curb ramp detail sheets in Task 3.1 4 40 40 84 $9,860 $9,860 Task 3.3 Engineer's Estimate
Engineer's Estimate 1 8 8 17 $2,005 $2,005
Response to City's 60% Responses 2 16 24 42 $4,770 $4,770 Response to City's 90% Responses 2 12 16 30 $3,470 $3,470 Response to City's 100% Responses 2 8 12 22 $2,550 $2,550 Task 3.4
Utility Research, Confirmation Letter (60%, 90% &
100%) and Coordination 1 6 16 23 $2,495 $2,495
Subtotal 22 180 326 528 $58,900 $37,000 $1,850 $97,750
Task 4 Bid Package
Prepare Bid Package 2 16 8 26 $3,250 $3,250
Subtotal 2 16 8 26 $3,250 $3,250
Task 5 Bid and Construction Support
Responses to Bid Questions and Inquiry 2 8 10 $1,410 $1,410 Attend Pre-bid Meeting 5 5 $675 $675
Attend Pre-construction Meeting 5 5 $675 $675
Review Construction Submittals (Shop Drawing
Review) 2 8 10 $1,410 $1,410
Responses to Request for Information (RFI) 2 16 18 $2,490 $2,490 Assist in Cost Estimate and Analysis for Contract
Change Orders 2 12 14 $1,950 $1,950
Subtotal 8 54 62 $8,610 $8,610
Totals 51 297 334 694 $81,380 $39,900 $37,000 $3,845 $162,125 Reproduction $500
Delivery $200
Travel $300
GRAND TOTAL= $163,125
Optional Tasks
Optional
Task #1 Conventional Ground Survey for 4 streets 1 6 7 $975 $11,500 $575 $13,050 Optional
Task #2 Conventional Ground Survey for 36 Curb Ramps 1 6 7 $975 $15,000 $750 $16,725 Total of Optional Tasks= $29,775
Exclusions
Roadway Profiles Environmental Services
Water Quality Documentation Traffic Signal Modification Design (temporary or permanent) Right of Way Engineering Plan Check/Permit Fee Cost
Utility Modification or Relocation Structure Modifications Design Street Light Design Private Property Owner Coordination & Meetings Utility Potholing Signing and Stripng Modification Design Traffic Study & Report
Mix Design for CSPB or CIR
1 of 1 4/26/2022 Tuesday, July 07, 2026 Reg CC MTG, Page *260 Tuesday, July 07, 2026 Reg CC MTG, Page *261
Attachment 3
Tuesday, July 07, 2026 Reg CC MTG, Page *262
Tuesday, July 07, 2026 Reg CC MTG, Page *263
Tuesday, July 07, 2026 Reg CC MTG, Page *264
Tuesday, July 07, 2026 Reg CC MTG, Page *265
Tuesday, July 07, 2026 Reg CC MTG, Page *266
Tuesday, July 07, 2026 Reg CC MTG, Page *267
Tuesday, July 07, 2026 Reg CC MTG, Page *268
Tuesday, July 07, 2026 Reg CC MTG, Page *269
Tuesday, July 07, 2026 Reg CC MTG, Page *270
Tuesday, July 07, 2026 Reg CC MTG, Page *271
Tuesday, July 07, 2026 Reg CC MTG, Page *272
Tuesday, July 07, 2026 Reg CC MTG, Page *273
1 SECOND AMENDMENT TO

AGREEMENT BETWEEN THE CITY OF LOMITA AND DAVID EVANS AND ASSOCIATES, INC. FOR ENGINEERING DESIGN SERVICES FOR STREET RECONSTRUCTION PROJECT – ZONE G
This Second Amendment to the Agreement between the City of Lomita, a general law city and municipal corporation (“City”) and David Evans and Associates, Inc., a California corporation (“Consultant”) is made and entered into this 7th day of July 2026.

A. The City and Consultant are parties to an Agreement for Engineering Design Services for Street Reconstruction Project – Zone G for dated July 19, 2022 (“the Agreement”).

B. The First Amendment (“Amendment No. 1”) to the Agreement was made and entered into on June 3, 2025, to increase the total not-to-exceed amount by $96,053, update the Scope of Service, and extend the term of the Agreement.

C. The City and Consultant desire to amend the Agreement to: (1) increase the total not-to-exceed amount of the Agreement by $79,370.00; (2) amend the Scope of Services to include additional work performed; (3) amend the Key Personnel; and (4) revise fee schedules.

NOW, THEREFORE, in consideration of the promises and mutual covenants contained therein, City and Consultant hereby agree as follows:

1. CONSIDERATION AND COMPENSATION. Section 1, entitled
“Consideration and Compensation.” Subsection C is hereby amended to read as follows:

As additional consideration, CITY agrees to pay CONSULTANT an amount not to exceed $389,758.00, for CONSULTANT’s services, unless otherwise specified by written amendment to this Agreement. The City Council has also approved an additional $7,500.00 for unexpected contingencies. Therefore, the total compensation as amended under the Second Amendment shall be a total, not-to-exceed amount of $397,258.00. If CONSULTANT incurs expenses exceeding the amount of $389,758.00, the CONSULTANT must request such expenses in writing, and the CITY’s City Manager or his designee must approve of such requests, for CONSULTANT to receive compensation for those costs.

2. EXHIBITS. In addition to the work plan as outlined in the Agreement and Amendment No. 1 of the Agreement, Consultant will complete the services and activities as set forth in Exhibit A-2. Certain fees relating to the services being provided are amended as set forth in Exhibit A-2. Exhibit A-2 attached hereto is incorporated herein by reference.

3. KEY PERSONNEL. Section 6, entitled “Key Personnel.” is hereby amended to read as follows:

Tuesday, July 07, 2026 Reg CC MTG, Page *274
2 CONSULTANT’s key personnel assigned to perform work under this Agreement are Marie Marston, PE and Ryan Williams, PE. CONSULTANT shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of CITY.

4. NO OTHER CHANGES. All terms, conditions and other provisions of the Agreement and Amendment No. 1 to the Agreement, including all Exhibits thereto, not affected by this Second Amendment shall remain in full force and effect.

5. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this amendment to the Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

IN WITNESS WHEREOF, the parties hereto have executed this Second Amendment on the 7th day of July 2026, at Lomita, California.

CITY OF LOMITA CONSULTANT
Andrew Vialpando
City Manager
By: Gabriel Rodriguez
Vice President
ATTEST:

Kathleen Horn Gregory
City Clerk
Taxpayer ID No.

APPROVED AS TO FORM:

Trevor Rusin
City Attorney
Tuesday, July 07, 2026 Reg CC MTG, Page *275
17542 E. 17th Street Suite 150 Tustin California 92780
June 23, 2026
Jennifer Howell
City of Lomita
24300 Narbonne Ave.

Lomita, CA 90717

Subject: Additional Scope of Work – Street Reconstruction Project – Zone G: 254th Street, 255th Street, Doria Avenue, additional portion of Walnut Street (including pavement, three curb extensions and six curb ramps) and Alcor Street Fire Hydrant

Dear Jennifer:

David Evans and Associates, Inc. is pleased to submit this proposal for additional services described in the following Exhibit A-2. If you have any questions, please let us know, otherwise please sign and return the attached Exhibit A-2 as soon as possible and we will proceed with the added scope.

Sincerely,

Ryan Williams, P.E.

Project Manager
Jennifer Howell, P.E.

Associate Engineer
Attachments:

Exhibit A-2 – Additional Scope of Work
Attachment 1 – Compensation & Fee Proposal
Attachment 2 – Additional Project Locations
Tuesday, July 07, 2026 Reg CC MTG, Page *276
Exhibit A-2 – Additional Scope of Work
June 23, 2026
17542 E. 17th Street Suite 150 Tustin California 92780
EXHIBIT A-2

ADDITIONAL SCOPE OF WORK
FOR
Street Reconstruction Project – Zone G:
254th Street, 255th Street, Doria Avenue, additional portion of Walnut Street (including pavement, three curb extensions and six curb ramps) and
Alcor Street Fire Hydrant

David Evans and Associates, Inc. (DEA) agrees to perform the additional scope of work described herein, as requested by the City of Lomita for the Street Reconstruction Project – Zone G. We understand the City would like DEA to add design and construction support services for three streets to Zone G Street Reconstruction Phases 3 & 4 which include 254th Street, 255th Street, and Doria Avenue, as well as an additional portion of Walnut Street (including pavement rehabilitation between 253rd Street and 253rd Place as well as three curb extensions and six curb ramps on the northwest, northeast, and southwest corners at the intersection of 253rd Street and Walnut Street), and the design of a fire hydrant and lateral connection to the water main on Alcor Street. See Attachment 2 for project locations. Note time and materials charged will be only for the services requested and performed. If some services that are included in the amendment are not ultimately requested, then they would not be performed or invoiced.

Additional services are necessary because the original contract did not include 254th Street, 255th Street, Doria Avenue, the additional portion of Walnut Street (including pavement, curb extensions and curb ramps), and the fire hydrant and lateral on Alcor Street as part of Zone G Street Reconstruction Phases 3 & 4.

Task 1 – Meetings and Coordination
This task includes ongoing project coordination with internal DEA staff, subconsultants, City staff, and City representatives throughout the design phase of the project. Services will include participation in projectrelated virtual meetings, coordination of technical and administrative matters, and communication necessary to support project delivery.

This task also includes coordination with the Local Travel Network (LTN) project team to ensure consistency between the proposed project design and planned improvements at the intersection of Ebony Lane, Walnut Avenue, and 253rd Street. The budget for LTN coordination includes participation in up to five (5) virtual meetings, preparation and distribution of meeting minutes, and routine email correspondence associated with coordination activities.

Tuesday, July 07, 2026 Reg CC MTG, Page *277
Exhibit A-2 – Additional Scope of Work
June 23, 2026
17542 E. 17th Street Suite 150 Tustin California 92780
Task 2 – Site Walk
Due to the addition of newly proposed streets and the time elapsed since the original field review was completed, an updated site walk is recommended. The purpose of this effort is to document current site conditions through updated photographs and field observations, and to identify any changes that may affect the project, design assumptions, or proposed improvements. Findings from the site walk will be incorporated into the ongoing design review and project development process.

Task 3 – Field Topographic Survey and Base Mapping
Task 3 includes establishing project survey control, field topographic survey, and preparing base mapping within the project area by David Evans and Associates, Inc. including 255th street between Walnut Street and the City Limit (just west of Western Avenue), Doria Avenue, and 254th Street West of Cypress Street. The work includes research and review of available survey and land records, development of a preliminary CAD base map, establishment of horizontal and vertical control, field topography, and refinement of roadway centerline and right-of-way information. The resulting topographic base map will cover approximately 2,400 linear feet of roadway, including adjacent sidewalks, intersections, and publicly available easement information. Note for 254th Street, 255th Street, and Doria Avenue survey will capture from back of walk to back of walk and will exclude homeowner improvements within the right-of-way.

Task 4 – Utility Coordination
As utility record information has not yet been obtained for the proposed project streets, DEA will coordinate with the applicable utility providers to obtain the most current available utility as-built records and facility information for 254th Street, 255th Street, Doria Avenue, and Alcor Street.

The collected utility information will be reviewed and incorporated into the project design as appropriate to identify potential utility conflicts, improve design accuracy, and support project development.

Task 5 – Plans, Specifications and Estimate (PS&E)
In addition to the scope of work from Amendment #1, the Phase 3 and 4 PS&E package will be revised to incorporate the following scope of work changes:

1. 254th Street, 255th Street, Doria Avenue and additional portion of Walnut Street Rehabilitation – This will include additional typical sections, revisions to the plan set, added civil plan sheets, added signing and striping sheets (assumed 8 sheets total). The Treatment of each street has been determined from the 2024 Pavement Management Program Update. DEA will proceed with these recommendations which includes the following:
a. Doria Avenue – Grind and Overlay
b. 254th Street – Full Depth Reconstruction
c. 255th Street – A combination of Grind and Overlay (westerly side from Walnut Street to cross gutter) and Full Depth Reconstruction (easterly side from city limits to cross gutter) Tuesday, July 07, 2026 Reg CC MTG, Page *278
Exhibit A-2 – Additional Scope of Work
June 23, 2026
17542 E. 17th Street Suite 150 Tustin California 92780
d. Walnut Street – Grind and Overlay from 253rd Street to new pavement just north of 253rd Place

2. Redesign the curb ramp on northerly corner of Cypress Street and 254th Street – The City identified this curb ramp as being non-compliant with ADA requirements and requiring removal and replacement. Additionally, a panel on the southwest cross gutter is damaged and will require replacement. A detail of this curb ramp will be provided but called out to be constructed per the applicable standard with no elevations.

3. 254th Street Gutter and Curb and Driveway Repairs – Remove and replace existing curb and gutter at the end of the cul-de-sac adjacent to the fire hydrant, approximately 15-feet. Driveway repair at address 2330 254th Street.

4. Proposed Fire Hydrant Connection – A fire hydrant is proposed at the end of Alcor Street. This will require design of the fire hydrant and the connection to the main water line.

Scope related to the Concept Design by the Toole Design Group curb extensions and curb ramps at 253rd Street and Walnut Street:

1. Four additional sheets for the detailing of curb extensions and associated curb ramps will be included.

Items not included in this scope package:

1. The following curb ramps do not appear to be out of compliance with ADA requirements and, therefore, are not included in this design. These include:
a. The curb ramps on Doria Avenue
b. The southwest curb ramp at Cypress Street and 254th Street Tuesday, July 07, 2026 Reg CC MTG, Page *279
Attachment 1 – Compensation
June 23, 2026
17542 E. 17th Street Suite 150 Tustin California 92780
Attachment 1
Compensation and Fee Proposal
FOR
Street Reconstruction Project – Zone G: 254th Street, 255th Street, Doria Avenue, additional portion of Walnut Street (including pavement, three curb extensions and six curb ramps) and Alcor Street Fire Hydrant
The City of Lomita shall compensate DEA for the services described in Exhibit A-2 – Additional Scope of Work.

We estimate a grand total fee of $71,870 for these additional tasks in accordance with the attached Fee Proposal. The fee amount will not be exceeded without prior written authorization by the City of Lomita.

Additional tasks will not be performed by DEA without prior written authorization by the City of Lomita.

Tuesday, July 07, 2026 Reg CC MTG, Page *280
Task No Task Description Personel Staff Rate Hours Amount Task 1 Meetings & Coordination Administrative Support Office Administrator Marga Rosso $ 65.00 $ 8 520.00 Local Travel Network Coordination, City, Subconsultants, Internal Project Engineer Ryan Williams $ 165.00 $ 8 1,320.00 Task 2 Site Walk Site walk, photos, and notes Project Engineer Ryan Williams $ 165.00 $ 9 1,485.00Task 3 Field Topographic Survey and Base Mapping Field Topographic survey and base mapping of new streets Surveyor DEA Survey Staff $ $ - - 29,500.00Task 4 Utility Coordination Obtain utility as-builts and add to CAD base files Civil Engineer Kim Schultz/Abigail Hartman $ $ 95.00 40 3,800.00 Project Engineer Ryan Williams $ 165.00 $ 9 1,485.00
Task 5 Plans, Specifications and Estimate (PS&E) Civil Sheets, typical sections, and ADA Curb Ramp Detail at Doria Civil Engineer Kim Schultz/Abigail Hartman $ $ 95.00 80 7,600.00 Project Engineer Ryan Williams $ $ 165.00 20 3,300.00
Task 5 Plans, Specifications and Estimate (PS&E) Signing and Striping Modifications at Ebony/253rd St/Walnut and Bike Lane on Ebony Civil Engineer Kim Schultz/Abigail Hartman $ 95.00 $ 8 760.00 Project Engineer Lisa Candelaria/Ryan Williams $ 165.00 $ 8 1,320.00 Task 5 Plans, Specifications and Estimate (PS&E) Signing and Striping Sheets for 254th St, 255th St, and Doria Civil Engineer Kim Schultz/Abigail Hartman $ 95.00 $ 8 760.00 Project Engineer Ryan Williams $ 165.00 $ 2 330.00
Task 5 Plans, Specifications and Estimate (PS&E) Alcor Hydrant and Water Line Water Resource Engineer/Civil Engineer Zack Worley/Kim Schultz/Abigail Hartman $ 95.00 $ 4 380.00 Project Engineer Zack Workley/Ryan Williams $ 165.00 $ 4 660.00 Task 5 Plans, Specifications and Estimate (PS&E) Three (3) Curb Extensions and Six (6) Curb Ramps at 253rd Street and Walnut Street Civil Engineer Kim Schultz/Abigail Hartman/ Craig Sample/Kirby Neale $ $ 95.00 80 7,600.00 Project Engineer Ryan Williams $ $ 165.00 20 3,300.00
Task 5 Plans, Specifications and Estimate (PS&E) Cost Estimate and Quantites Civil Engineer Kim Schultz/Abigail Hartman $ $ 95.00 18 1,710.00 Project Engineer Ryan Williams $ 165.00 $ 8 1,320.00
Task 5 Plans, Specifications and Estimate (PS&E) Specification Revisions Civil Engineer Kim Schultz/Abigail Hartman $ 95.00 $ - - Project Engineer Ryan Williams $ 165.00 $ 8 1,320.00
Task 5 Plans, Specifications and Estimate (PS&E) QA/QC Civil Engineer Kim Schultz/Abigail Hartman $ 95.00 $ 8 760.00 Project Engineer Ryan Williams $ $ 165.00 16 2,640.00
$ 1,840.00$ 1,485.00
$ 29,500.00
$ 5,285.00
$ 33,760.00$ 71,870.00
Attachment 1 - Fee Proposal
Phase 3 & 4
Assumptions:1. Plan modifications assumes 2 round of revisions. 2. All meeting are assumed to be virtual.

Task 1 SubtotalTask 3 SubtotalTask 4 SubtotalTask 5 SubtotalTask 2 Subtotal

GRAND TOTAL
Tuesday, July 07, 2026 Reg CC MTG, Page *281
Tuesday, July 07, 2026 Reg CC MTG, Page *282

SHARROWS AFTER INTERSECTIONS AND
SPACED AT 250' INTERVALS (TYP.)

EXISTING PARKING TO BE
MAINTAINED (TYP.) 10' (TYP.)
8' 5' 11' 5' 8'

10.5' 10.5'
6' 10' 10' 6' 8'
5' 10' 10' 10' 5' 8'
8'
8'
XX.XX.20XX
02LAX.00444.00

CITY OF LOMITA

CONCEPT DESIGN SUBMISSION

PRELIMINARY - NOT FOR CONSTRUCTION
13 OF 15

CONCEPT DESIGN
XX
XX
XX
XX
XXX H:\G0000\02lax.00444.00_p_lomita local travel network\production\CADD\PLANS\02LAX.00444.00_TP_ConceptMerged.dwg Wednesday, March 18, 2026 9:34:33 AM 0 SCALE IN FEET
40' 80' 120'

LOMITA LOCAL TRAVEL NETWORK
PROJECT NO.

NO. DATE REVISION BY APVD

REUSE OF DOCUMENTS
ALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT.

REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. DATE
DRAWING NO.

SHEET NO.

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE PLANS

WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF [STATE],
LICENSE NO. __________,
EXPIRATION DATE: ________________.

CHK
DSGN
DR
APVD
742 S. HILL STREET, SUITE 600
LOS ANGELES, CA 90014
PHONE: 213.257.8680
www.tooledesign.com
Submitted by TDG Engineering, Inc., an affiliate of Toole Design Group, LLC 254TH ST MATCH LINE SEE SHEET
6 MATCH LINE SEE LEFT

MATCH LINE SEE RIGHT WALNUT ST WALNUT ST WALNUT ST
253RD PL
253RD ST 253RD ST MONTEREY CIR

EBONY LN
254TH ST FROM ESHELMAN AVE TO WALNUT
AVE, WALNUT AVE TO 253RD ST, AND 253RD ST

TO CITY BOUNDARY

KEY MAP
SCALE: NTS
Tuesday, July 07, 2026 Reg CC MTG, Page *283
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Deanna Fraley, PE, Public Works Director
MEETING DATE: July 7, 2026
SUBJECT: Professional Services Agreements for On-call Capital Improvement Project Civil Engineering Services

RECOMMENDED ACTION
Approve Professional Services Agreements between the City of Lomita and Psomas, David Evans and Associates, Inc., Mark Thomas, Kimley-Horn and Associates, Inc., General Technologies and Solutions Inc., and Transtech Engineering, Inc. for Capital Improvement Project Civil Engineering services for three-year terms, with the option to extend for two additional one-year terms, in an amount not to exceed $500,000 over three years for each agreement; and authorize the City Manager to execute the agreements.

BACKGROUND
The City of Lomita delivers multiple capital improvement projects each year that require highly qualified civil engineering firms to augment capital improvement project workload throughout the year. These services include roadway design, water and sewer improvements, traffic engineering, structural engineering, survey, geotechnical engineering, utility coordination, and construction support. This use of contracted engineering firms can be scaled as needed depending on project complexity, staff vacancies, and technical specialties.

Ordinarily, the City prepares a separate engineering services Request for Proposals (RFP) for each CIP project. The cumbersome process typically takes about three months and involves preparation of the RFP, fee negotiations, contract preparation, City Council approval and award of contract.

To improve project delivery and efficiency, a pre-qualified list of on-call engineering firms is recommended. Utilizing on-call agreements eliminates the need to conduct a RFP process for each individual project, allowing projects to begin design much sooner while

CITY OF LOMITA

CITY COUNCIL REPORT
Item No.
8c
Tuesday, July 07, 2026 Reg CC MTG, Page *284
2 still maintaining City Council oversight. Additionally, on-call contracts comply with the City’s procurement and are approved upon budget appropriation and authorization by the City Council.

Approval of these on-call agreements does not mean that the City will pay each firm $500,000, nor does it authorize work on any specific capital improvement project. Simply, the recommended action establishes a list of qualified consultants that may be utilized as needed and restricts the City from paying amounts beyond $500,000 over the life of the agreement. Although the contract “not-to-exceed” amounts are established, each project budget and funding appropriation will be reviewed and authorized by the City Council as the project construction is approved.

DISCUSSION
In May 2026, the Public Works Department issued a request for proposals (RFP) for oncall general civil engineering services. The scope of work called for proposa;s on a variety of civil engineering services including:
• Water and sanitary Sewer Analysis and Design
• Storm Sewer Analysis Design
• Dry Utility Design
• Traffic Analysis and Design
• Street Improvement Engineering
• Geotechnical Engineering
• Structural Analysis and Design
• Survey and Right-of-Way
• Project Management
• General Civil Engineering Design
The RFP was advertised through PlanetBids, and twelve proposals were received. A panel consisting of three Staff members representing the Public Works Department evaluated the proposals.

Table 1: Evaluation Sheet for On-Call General Civil Engineering Services Rank Consultant
1 Psomas
2 David Evans and Associates, Inc.
3 Mark Thomas
4 General Technology Solutions, Inc.
5 Kimley-Horn and Associates, Inc.
6 Transtech Engineers, Inc.
7 BKF Engineers
8 LAE Associates, Inc.
9 AYCE Consulting Engineers, Inc.
10 KPFF, Inc
Tuesday, July 07, 2026 Reg CC MTG, Page *285
3 11 AE Group Engineers IE
12 Ladayu Consulting Group
Based on the evaluation results and the City’s anticipated workload, staff recommends establishing on-call agreements with the six highest-ranked firms. Having multiple firms available provides flexibility to select consultants based on project type, technical expertise, staff availability, scheduling, and workload while maintaining competitive pricing and ensuring timely delivery of engineering services.

When a project requiring engineering services is identified, staff will prepare a projectspecific scope of work and negotiate a fee with the consultant best suited for that project.

Each project and its associated engineering fee will be presented to the City Council for separate approval before any design work is authorized. These agreements do not guarantee any minimum amount of work to any consultant and do not preclude the City from issuing separate Requests for Proposals when staff determines that doing so is in the City’s best interest.

FISCAL IMPACT
Approval of these agreements does not appropriate or obligate any funds and does not create an immediate fiscal impact.

The $500,000 “not-to-exceed” amount represents the maximum cumulative contract capacity available over the life of each agreement should future projects be assigned.

Actual expenditures will occur only if the City Council subsequently approves projectspecific task orders or design contracts. Any future engineering services performed under these agreements will likely be funded through the applicable Capital Improvement Program or operating budgets and will return to the City Council for approval as part of the project authorization process.

VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 5: City Infrastructure & Water Utility – Investing in reliable, sustainable infrastructure.

OPTIONS

1. Approve recommended action.

2. Provide alternate direction.

Tuesday, July 07, 2026 Reg CC MTG, Page *286
4 ATTACHMENTS

1. Professional Service Agreement with Psomas

2. Professional Service Agreement with David Evans and Associates, Inc.

3. Professional Service Agreement with Mark Thomas

4. Professional Service Agreement with Kimley-Horn and Associates, Inc.

5. Professional Service Agreement with General Technology Solutions, Inc.

6. Professional Service Agreement with Transtech Engineers, Inc.

Reviewed by: Approved by:
_______________________ ______________________
Deanna Fraley, PE Andrew Vialpando
Public Works Director City Manager
Tuesday, July 07, 2026 Reg CC MTG, Page *287

CONTRACT FOR PROFESSIONAL SERVICES

BETWEEN

THE CITY OF LOMITA AND PSOMAS

Page 1 of 13 ends
← All documents from this meeting