SECTION E – Page 8
STANDARD SPECIFICATIONS
When the Contractor arranges for additional work areas and facilities temporarily required by him/her, he/she shall provide the Agency with proof that the additional work areas and/or facilities have been left in a condition satisfactory to the owner(s) of said work areas and/or facilities prior to acceptance of the work. 2-4 COOPERATION AND COLLATERAL WORK
Contractor shall coordinate his/her work so as to minimize disruption to ongoing or scheduled private development projects in the project area.
2-7 CHANGES INITIATED BY THE AGENCY
2-7.1 GENERAL
All final locations determined in the field, and any deviations from the Plans and Specification, shall be marked in red on the documents to show the as-built conditions. Contractor shall maintain a complete and accurate record of all changes of construction from that shown in these plans and specifications for the purpose of providing a basis for construction record drawings. No changes shall be made without prior written approval of the Engineer. Upon completion of the Project, Contractor shall deliver this record of all construction changes to the Engineer along with a letter which declares that other than these noted changes “the Project was constructed in conformance with the Contract Documents”. Final payment will not be made until this requirement is met.
As the figured dimensions shown on the drawings and in the specifications of the Contract may not in every case agree with scaled dimensions, the figured dimensions shall be followed in preference to the scaled dimensions, and drawings to a large scale shall be followed in preference to the drawings to a small scale.
Should it appear that the work to be performed, or any related matter, are not sufficiently detailed or explained in the Contract documents, the Contractor shall apply to the Engineer for such further explanations as necessary, and shall conform to such further explanations provided by the Engineer as part of the Contract to the extent that it is consistent with the terms of the Contract.
Caution: The engineer preparing these plans will not be responsible or liable for unauthorized changes to or uses of these plans. All changes to the plans must be approved in writing by the Engineer.
SECTION 3 – CONTROL OF THE WORK
3-3 SUBCONTRACTORS
All persons engaged in the Work, including Subcontractors and their employees, will be considered employees of the Contractor. The Contractor will be held responsible for their work. The Agency will deal directly and solely with the Contractor and make all payments to the Contractor. 3-5 INSPECTION
SECTION E – Page 9
STANDARD SPECIFICATIONS
The Agency shall inspect for compliance with requirements for 8-hour days and 40-hour weeks on normal working days. The Contractor shall reimburse the Agency, at rates established by the Agency, for any additional inspection, including inspection on legal holidays. 3-10 SURVEYING
3-10.1 GENERAL
The Contractor shall be responsible for all survey and layout of work.
The line and grades for construction will be parallel to and offset from the position of the work. From the established lines and grades, the Contractor shall extend the necessary lines and grades for construction of the work and shall be responsible for the correctness of same. 3-12 WORK SITE MAINTENANCE
3-12.1 GENERAL
3-12.1.1 WORK AREA APPEARANCE
The Contractor shall maintain a neat appearance to the Work.
All unsuitable construction materials and rubbish and debris shall be regularly removed from the job site, be transported to a suitable location, and be disposed of in a proper and legal manner.
In any area visible to the public, the following shall apply:
1. Broken concrete and debris developed during clearing and grubbing shall be disposed of weekly.
2. The Contractor shall furnish trash bins for all debris from structure construction. All debris shall be placed in trash bins daily.
3. Forms or false work that are to be re-used shall be neatly stacked concurrent with their removal.
4. Forms and false work that are not to be re-used shall be disposed of with their removal.
5. Wash down from concrete trucks shall be at one location. Concrete from wash down procedures shall be removed from the site weekly.
3-12.3 NOISE CONTROL
A noise level limit of 85 dba at a distance of fifty (50) feet shall apply to all construction equipment on or related to the job, whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided except in those cases where required for the protection of personnel.
SECTION E – Page
10 The Contractor shall arrange and maintain a secure storage site for all equipment and materials. All equipment and unused materials shall be returned to this site at the end of each work day. 3-12.6 WATER POLLUTION CONTROL
3-12.6.1 GENERAL
This item shall consist of preparation, implementation and compliance with a storm water pollution prevention plan (SWPPP) for the project, if applicable. 3-12.6.2 BEST MANAGEMENT PRACTICES (BMPs)
All storm water pollution prevention measures shall be in accordance with the submitted SWPPP. In the event circumstances during the course of construction require changes to the original SWPPP, a revised plan shall be promptly submitted to the Agency’s representative in each instance. No responsibility shall accrue to the Agency as a result of the plan or as a result of knowledge of the plan. All work installed by the Contractor in connection with the SWPPP but not specified to become a permanent part of the project shall be removed and the site restored in so far as practical to its original condition prior to completion of construction or when directed by the Agency’s representative. 3-12.6.3 STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
Contractor shall submit to the engineer a completed and signed SWPPP at the preconstruction conference.
The plan may utilize the practices recommended in the California Storm Water Best Management Practices Handbook dated January 2015, available from California Stormwater Quality Association (CSQA), and online at http://www.cabmphandbooks.net/ . The plan shall be consistent with the construction General Permit, issued by the State Water Resources, Control Board, through submittal of the Notice of Intent (NOI).
If construction will occur between October 15 and April 15 (considered as the rainy season per the Agency’s Ordinance), a wet weather erosion control plan must be submitted. Additionally, Best Management Practices (BMPs) implemented during the Agency’s rainy season shall include but not be limited to those appropriate for wet weather conditions.
3-12.6.5 PAYMENT
Unless otherwise indicated in the Special Provision, measurement and payment for Storm Water Pollution Prevention Measures, as described herein, shall be included in the items of Work requiring storm water pollution prevention measures as indicated in the project Special Provisions. Such payment shall be considered full compensation for all labor, materials, tools, and equipment for completion, and implementation and compliance with the SWPPP.
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY
SECTION E – Page
11 3-13.3 WARRANTY
The Contractor shall warrant and guarantee the entire Work and all parts thereof, including that performed and constructed by subcontractors, and others employed directly or indirectly on the Work, against faulty or defective materials, equipment or workmanship for the maximum period provided by law. In addition thereto, for a period of one (1) year commencing on the date of acceptance of the Work, the Contractor shall, upon the receipt of notice in writing from the Agency, promptly make all repairs arising out of defective materials, workmanship or equipment and bear the cost thereof. The Agency is hereby authorized to make such repairs and the Contractor and Surety shall bear the cost thereof if, ten (10) days after the giving of such notice to the Contractor, the Contractor has failed to make or undertake with due diligence the repairs; provided, however, that, in the case of an emergency where, in the opinion of the Agency, delay could cause serious loss or damage, repairs may be made without notice being sent to the Contractor or Surety, and all expense in connection therewith shall be charged to the Contractor and Surety.
For the purpose of this article “Acceptance of the Work” shall mean the acceptance of the Work by the Agency in accordance with Subsection 3-13.2 but not for the purpose of extinguishing any covenant or agreement or agreement on the part of the Contractor to be performed or fulfilled under this Contract, which has not in fact been performed or fulfilled at the time of such acceptance all of such covenants and agreements, shall continue to be binding on the Contractor until they have been fulfilled.
The effective date of Acceptance of the Work and commencement of the Guarantee shall be the date of acceptance of the Notice of Completion by the City Council. 3-13.3.4 GENERAL GUARANTY
The Contractor shall remedy any defects in the Work and pay for any damage to other work resulting therefrom, which shall appear within a period of one year from the date of final acceptance of the Work unless a longer period is specified. The Agency will give notice of observed defects with reasonable promptness.
SECTION 4 – CONTROL OF MATERIALS
4-1 GENERAL
The Contractor and all subcontractors, suppliers, and vendors, shall guarantee that the entire Work will meet all requirements of this Contract as to the quality of materials, equipment, and workmanship. The Contractor, at no cost to the Agency, shall make any repairs or replacements made necessary by defects in materials, equipment, or workmanship that become evident within one year after the date of recordation of the Notice of Completion. Within this one year period, the Contractor shall also restore to full compliance with the requirements of this Contract any portion of the Work which is found not to meet those requirements. The Contractor shall defend, indemnify, and hold the Agency, its officers, agents, and employees harmless from claims of any kind due to injuries or damages arising, directly or indirectly, from said defects or noncompliance.
SECTION E – Page 10
STANDARD SPECIFICATIONS
The Contractor shall make all repairs, replacements, and restorations within thirty-five (35) days after the date of the Engineers’ written notice.
If, in the opinion of the Engineer, the defective work is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if, in the opinion of the Engineer, the removal of such work is impractical or will create conditions which are dangerous or undesirable, the Agency shall have the right and authority to retain such work instead of requiring it to be removed and reconstructed, but will make such deductions thereof in the payments due or to become due to the Contractor as the Agency may deem just and reasonable.
4-4 TESTING
Except as elsewhere specified, the Agency will bear the cost of testing material and/or workmanship which meet or exceed the requirements indicated in the Standard Specifications and the Special Provisions. The Contractor shall bear the cost of all other tests, including the retesting of material or workmanship that fails to pass the first test.
4-6 TRADE NAMES
Approval of equipment and materials offered as equivalents to those specified must be obtained prior to the opening of bids as set forth in the Instructions to Bidders.
Along with information supplied by the Contractor regarding equivalency of the proposed item, the Contractor shall clearly identify all deviations from the specified item. Deviations discovered by the Engineer after acceptance of an “or equal” item which were not identified by the Contractor with his/her submittal shall be cause for rejection of the “or equal” item. Contractor shall be due no additional compensation in time or money for acceptance or rejection of a proposed “or equal” item and subsequent replacement with the item specified. Contractor shall pay cost to Agency for items requiring more than two submittals and analysis of any shop drawing which requires more than a general review of an “or equal” item.
SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-3 LABOR
5-3.1 GENERAL
The Contractor shall ensure unlimited access to the job site for all Equal Opportunity Compliance officers.
Every Contractor and Subcontractor shall keep an accurate record showing the name, occupation, and the actual per diem wages paid to each worker employed by him/her in connection with the public work. The record shall be kept open at all reasonable hours to the inspection of the body awarding the Contract and to the Division of Labor Law Enforcement.
SECTION E – Page 11
STANDARD SPECIFICATIONS
5-3.4.1 OVERTIME AND SHIFT WORK
The Contractor may establish overtime and shift work as a regular procedure only with the written permission of the Engineer. Such permission may be revoked at any time. No work other than overtime and shift work established as a regular procedure shall be done between the hours of 4:00 p.m. and 7:30 a.m., nor on Saturdays, Sundays or legal holidays, except such work as is necessary for the proper care and protection of the work already performed or except in case of an emergency.
All costs for overtime inspection, except those occurring as a result of overtime and shift work established as a regular procedure, shall be paid by the Contractor. Overtime inspection shall include inspection required during holidays observed by the AGC and Trade Unions, Saturdays, Sundays, and any weekday between the hours of 4:00 p.m. and 7:30 a.m.. Such costs will include but will not necessarily be limited to engineering, inspection, general supervision and other overhead expenses that are directly chargeable to the overtime work. The Agency shall deduct all such charges from payments due the Contractor.
5.4 INSURANCE
5-4.2 GENERAL LIABILITY INSURANCE
5-4.2.1 GENERAL
CONTRACTOR and AGENCY agree that Agency, its employees, agents and officials should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys fees, litigation costs, defense costs, court costs or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the parties to be interpreted and construed to provide the fullest protection possible under the law to the Agency.
CONTRACTOR acknowledges that AGENCY would not have entered into this Agreement in the absence of the commitment of CONTRACTOR to indemnify and protect AGENCY as set forth here. 5-4.2.2 To the full extent permitted by law, CONTRACTOR shall defend, indemnify and hold harmless AGENCY, its employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged, or threatened, actual attorneys fees incurred by AGENCY, court costs, interest, defense costs including expert witness fees and any other costs or expenses of any kind whatsoever without restriction or limitation incurred in relation to, as a consequence of, arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part to the performance of this Agreement. All obligations under this provision are to be paid by CONTRACTOR as they are incurred by the AGENCY. 5-4.2.3 Without affecting the rights of AGENCY under any provision of this agreement or this section, CONTRACTOR shall not be required to indemnify and hold harmless AGENCY as set forth above for liability attributable to the sole fault of AGENCY, provided such sole fault is determined by agreement between the parties or the findings of a court of competent jurisdiction.
This exception will apply only in instances where the AGENCY is shown to have been solely at fault and not in instances where CONTRACTOR is solely or partially at fault or in instances where AGENCY’s fault accounts for only a percentage of the liability involved. In those instances, the obligation of CONTRACTOR will be all-inclusive and AGENCY will be indemnified for all liability incurred, even though a percentage of the liability is attributable to the conduct of the AGENCY. 5-4.2.4 CONTRACTOR acknowledges that its obligation pursuant to this section extends to liability attributable to AGENCY, if that liability is less than the sole fault of AGENCY. CONTRACTOR has no obligation under this Agreement for liability proven in a court of competent jurisdiction or by written agreement between the parties to be the sole fault of AGENCY.
SECTION E – Page 12
STANDARD SPECIFICATIONS
5-4.2.5 The obligations of CONTRACTOR under this or any other provision of this Agreement will not be limited by the provisions of any workers compensation act or similar act. CONTRACTOR expressly waives its statutory immunity under such statutes or laws as to AGENCY, its employees, agents and officials. 5-4.2.6 CONTRACTOR agrees to obtain executed indemnity agreements with provisions identical to those as set forth here in this section from each and every subcontractor, sub-tier contractor or any other person or entity involved by, for, with or on behalf of CONTRACTOR in the performance or subject matter of this Agreement. In the event CONTRACTOR fails to obtain such indemnity obligations from others as required here, CONTRACTOR agrees to be fully responsible according to the terms of this section. 5-4.2.7 Failure of AGENCY to monitor compliance with these requirements imposes no additional obligations on AGENCY and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend AGENCY as set forth herein is binding on the successors, assigns or heirs of CONTRACTOR and shall survive the termination of this Agreement or this section. 5-4.2.8 CONTRACTOR agrees to provide insurance in accordance with the requirements as set forth here.
If CONTRACTOR uses existing coverage to comply with these requirements and that coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so. The following coverages will be provided by CONTRACTOR and maintained on behalf of AGENCY and in accordance with the requirements set forth herein. 5-4.2.9 Commercial General Liability/Umbrella Insurance. Primary insurance shall be provided on ISOCGL form No. CG 00 01 11 85 or 88. Total limits shall be not less than two million dollars ($2,000,000.00) per occurrence for all coverages and two million dollars ($2,000,000.00) general aggregate. AGENCY and its officers, agents and employees shall be named as additional insureds using ISO additional insureds endorsement form CG 20 10 11 85 (in no event will AGENCY accept an endorsement form with an edition date later than 1990). Coverage shall apply on a primary non- contributing basis in relation to any other insurance or self-insurance, primary or excess, available to AGENCY or any employee or agent of AGENCY. Coverage shall not be limited to the vicarious liability or supervisory role of any additional insured. Umbrella Liability Insurance (over primary) shall apply to bodily injury/property damage, personal injury/advertising injury, at a minimum, and shall include a “drop down” provision providing primary coverage above a maximum of $25,000.00 self-insured retention for liability not covered by primary policies but covered by the umbrella policy. Coverage shall be following form to any underlying coverage.
Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross-liability exclusion. Policies shall have concurrent starting and ending dates.
Each policy of insurance shall contain a clause prohibiting cancellation, modification or lapse without thirty (30) days prior written notice having been given to the City. All insurance policies shall be subject to approval by the City Attorney and certificates evidencing such policies shall be provided to the City concurrently with the filing of all required bonds.
5.4.2.10 Business Auto/Umbrella Liability Insurance. Primary coverage shall be written on ISO Business Auto Coverage form CA 00 01 06 92 including symbol 1 (Any Auto). Limits shall be no less than two million dollars ($2,000,000.00) per accident. Starting and ending dates shall be concurrent. If CONTRACTOR owns no autos, a non-owned auto endorsement to the General Liability policy drafted above is acceptable.
5-4.3 WORKERS’ COMPENSATION INSURANCE
SECTION E – Page 13
STANDARD SPECIFICATIONS
5-4.3.1 Workers’ Compensation/Employers’ Liability shall be written on a policy form providing workers’ compensation statutory benefits as required by law. Employers’ liability limits shall be no less than one million dollars per accident or disease. Employers’ liability coverage shall be scheduled under any umbrella policy described above. Unless otherwise agreed, this policy shall be endorsed to waive any right of subrogation as respects the AGENCY, its officers, agents or employees. 5-4.3.2 CONTRACTOR and AGENCY further agree as follows:
5-4.3.2.1 This Section supersedes all other sections and provisions of this Agreement to the extent that any other section or provision conflicts with or impairs the provisions of this Section. 5-4.3.2.2 Nothing contained in this Section is to be construed as affecting or altering the legal status of the parties to this Agreement. The insurance requirements set forth in this Section are intended to be separate and distinct from any other provision in this Agreement and shall be interpreted as such. 5-4.3.2.3 All insurance coverage and limits provided pursuant to this Agreement shall apply to the full extent of the policies involved, available, or applicable. Nothing contained in this Agreement or any other agreement relating to the AGENCY or its operations limits the application of each insurance coverage. 5-4.3.2.4 Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only and is not intended by any party to be all-inclusive, or to the exclusion of other coverage, or a waiver of any type. 5-4.3.2.5 For purposes of insurance coverage only, this Agreement shall be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement.
5-4.3.2.6 All general or auto liability insurance coverage provided pursuant to this Agreement, or any other agreements pertaining to the performance of this Agreement, shall not prohibit CONTRACTOR, and CONTRACTOR’s agents, officers or employees from waiving the right of subrogation prior to a loss.
Contractor hereby waives all rights of subrogation against AGENCY. 5-4.3.2.7 Unless otherwise approved by AGENCY, CONTRACTOR’s insurance shall be written by insurers authorized to do business in the State of California and with a minimum “Best’s” Insurance Guide rating of “A+VIII.” Self-insurance will not be considered to comply with these insurance specifications. 5-4.3.2.8 In the event any policy of insurance required by this Agreement does not comply with these requirements or is canceled and not replaced, AGENCY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by AGENCY will be promptly reimbursed by CONTRACTOR.
Upon CONTRACTOR’s failure to make such reimbursement within 30 days of written demand, AGENCY may deduct that sum from any monies due CONTRACTOR hereunder or otherwise. 5-4.3.2.9 CONTRACTOR agrees to provide evidence of the insurance required herein, satisfactory to AGENCY, consisting of certificate(s) of insurance evidencing all of the coverages required and an additional insured endorsement to CONTRACTOR’s general liability and umbrella liability policy (if any) using ISO form CG 20 10 11 85. Certificate(s) are to reflect that the insurer will provide 30 days’ notice of any cancellation of coverage. CONTRACTOR agrees to require its insurer to modify such
SECTION E – Page 14
STANDARD SPECIFICATIONS
certificates to delete any exculpatory wording stating that failure of insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.
CONTRACTOR agrees to provide complete copies of policies to AGENCY upon request. 5-4.3.2.10 CONTRACTOR shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Such proof shall be furnished within 72 hours of the expiration of thecoverages. 5-4.3.2.11 Any actual or alleged failure on the part of AGENCY or any other additional insured under these requirements to obtain proof of insurance required under this Agreement in no way waives any right or remedy of AGENCY or any additional insured, in this or any other regard. 5-4.3.2.12 CONTRACTOR agrees to require all subcontractors or other parties hired for this project to provide general liability insurance naming as additional insureds all parties to this Agreement.
CONTRACTOR agrees to obtain certificates evidencing such coverage and make reasonable efforts to ensure that such coverage is provided as required here. CONTRACTOR agrees to require that no contract used by any subcontractor, or contracts CONTRACTOR enters into on behalf of AGENCY, will reserve the right to charge back to AGENCY the cost of insurance required by this Agreement. CONTRACTOR agrees that upon request, all agreements with subcontractors or others with whom CONTRACTOR contracts on behalf of AGENCY will be submitted to AGENCY for review. Failure of AGENCY to request copies of such agreement will not impose any liability on AGENCY, its officers, agents, or employees. 5-4.3.2.13 If CONTRACTOR is a Limited Liability Company, general liability coverage must be amended so that the Limited Liability Company and its Managers, Affiliates, employees, agents and other persons necessary or incidental to its operations are insureds. 5-4.3.2.14 CONTRACTOR agrees to provide immediate notice to AGENCY of any claim or loss against CONTRACTOR that includes AGENCY as a defendant. AGENCY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims. 5-7 SAFETY
At the pre-construction meeting, the Contractor shall submit his/her complete construction schedule to the Engineer for approval. The Contractor shall submit requests for changes in the schedule to the Engineer for approval at least forty-eight (48) hours prior to the scheduled Work. 5-8 PROJECT INFORMATION SIGN
No project information sign is needed for this Project.
SECTION E – Page 15
STANDARD SPECIFICATIONS
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
Prior to issuing the Notice to Proceed, the Engineer will schedule and conduct a pre-construction meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination, discuss construction methods, and clarify inspection procedures. 6-2 PROSECUTION OF THE WORK
Should the Contractor fail to take the necessary steps to fully accomplish said purposes, after orders of the Engineer to do so, the Agency may suspend the work in whole or in part, until the Contractor takes said steps at no cost to the Agency.
The Contractor shall submit monthly progress reports to the Engineer by the tenth day of each month. The report shall include an updated construction schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports. 6-3 TIME OF COMPLETION
6-3.3 WORKING DAY
The Contractor’s activities shall be confined to the hours between 7:30 a.m. and 4:00 p.m. Monday through Friday. In addition, the Contractor shall not perform any Work on Saturday, Sunday, or on Agencydesignated holidays. Agency-designated holidays are listed in TABLE 1 – AGENCY- DESIGNATED HOLIDAYS below. Deviation from these hours will be permitted upon approval of the Engineer, except in emergencies involving immediate hazard to persons or property.
Deviations from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. Service fees will be calculated at overtime rates including benefits, overhead, and travel time; and will be deducted from the amounts due the Contractor.
Failure of the Contractor to adhere to working day requirements will result in damages being sustained by the City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. For each OCCURRENCE of a working day or hours violation, as provided herein, the Contractor shall pay to the Agency, or have withheld from monies due to it, the sum of $1,000.00.
TABLE 1 – AGENCY-DESIGNATED HOLIDAYS
New Year’s Day
Martin Luther King, Jr. Day
President’s Day
Memorial Day
Independence Day
Labor Day
Veteran’s Day
Thanksgiving Day
Day after Thanksgiving
Christmas Eve
Christmas Day
SECTION E – Page 16
STANDARD SPECIFICATIONS
EXECUTION OF THE CONTRACT SHALL CONSTITUTE AGREEMENT BY THE AGENCY AND CONTRACTOR THAT $1,000 PER VIOLATION IS THE MINIMUM VALUE OF THE COST
AND ACTUAL D A M A G E D CAUSED BY FAILURE OF THE CONTRACTOR TO LIMIT
PERFORMANCE OF THE WORK BETWEEN THE ALLOTTED TIMES, THAT SUCH SUM
SHALL NOT BE CONSTRUED AS A PENALTY, AND THAT SUCH SUM MAY BE DEDUCTED FROM PAYMENTS DUE THE CONTRACTOR IF SUCH DELAY OCCURS.
6-4 DELAYS AND EXTENSION OF TIME
6-4.1 GENERAL
6-4.1.1 Notice of Delays
Whenever the Contractor foresees any delay in the prosecution of the work, and in any event immediately upon the occurrence of any delay which the Contractor regards as unavoidable, he/she shall notify the Engineer in writing of the probability of the occurrence of such delay and its cause so that the Engineer may take immediate steps to prevent, if possible, the occurrence or continuance of the delay, or, if prevention is not possible, may determine whether the delay is to be considered avoidable or unavoidable, how long it continues, and to what extent it will delay the prosecution and completion of the work. It will be concluded that any and all delays which have occurred in the prosecution and completion of the work have been avoidable delays, except such delays as shall have been called to the attention of the Engineer at the time of their occurrence and found by him/her to have been unavoidable. The Contractor shall make no claims for any delay not called to the attention of the Engineer at the time of its occurrence as an unavoidable delay.
6-4.1.2 Avoidable Delays
Avoidable delays in the prosecution or completion of the work shall include all delays which in the opinion of the Engineer would have been avoided by the exercise of care, prudence, foresight, and diligence on the part of the Contractor of his/her subcontractors. The following shall be considered avoidable delays within the meaning of the contract: 1) Delays in the prosecution of parts of the work which may in themselves be unavoidable but do not necessarily prevent or delay the prosecution of other parts of the work or the completion of the whole work within the time herein specified; 2) Reasonable loss of time resulting from the necessity of submitting samples of materials and drawings to the Engineer for approval and from performing tests of materials, measurements, and inspections; 3) Reasonable interference of other contractors employed by the Agency and/or other contractors working in the area which do not necessarily prevent the completion of the whole work within the time agreed upon; 4) Delays resulting from inaccurate or incomplete shop drawing submittals; and 5) Interference of other contractors performing concurrent work.
6-4.1.3 EXTENSION OF TIME
In case the work is not completed in the time specified, including such extensions of time as may have been granted for unavoidable delays, the Contractor will be assessed damages for delay in accordance with Paragraph 6-9. The Agency, however, shall have the right to grant an extension of time for avoidable delay if it is deemed in his/her best interest to do so. During such extension of time, the Contractor will be charged for engineering and inspection services and other costs as provided in Paragraph 6-4.2.1 but will not be assessed damages pursuant to Paragraph 6-9.
6-4.2 EXTENSIONS OF TIME
6-4.2.1 COMPENSATION TO AGENCY FOR EXTENSION OF TIME
SECTION E – Page 17
STANDARD SPECIFICATIONS
Compensation for extension of time for avoidable delay granted pursuant to Paragraph 6-4.1.3 shall be the actual cost to the Agency for engineering, inspection, general supervision, and overhead expenses which are directly chargeable to the work and which accrue during the period of such extension, except that the cost of final inspection and preparation of the final estimate shall not be included. 6-4.4 WRITTEN NOTICE AND REPORT
Requests for an extension of time must be delivered to the Agency within ten (10) consecutive calendar days following the date of the occurrence that caused the delay. The request must be submitted in writing and must state the cause of the delay, the date of the occurrence causing the delay, and the amount of additional time requested. This shall be included as part of a revised construction schedule required in Section 6-1. Requests for extensions of time shall be supported by all evidence reasonably available or known to the Contractor, which would support the extension of time requested. Requests for extensions of time, which are not received within the time specified above, shall result in the forfeiture of the Contractor’s right to receive any extension of time requested.
If the Contractor is requesting an extension of time because of weather, he/she shall supply daily written reports to the Agency’s representative describing such weather, and the work that could not be performed that day because of such weather or conditions resulting therefrom and that he/she otherwise would have performed.
6-9 LIQUIDATED DAMAGES
6-9 FORFEITURE DUE TO DELAY
The Contractor shall complete all or any designated portion of the Work called for under the Contract within the time set forth in Part C (Proposal) of these Specifications.
In accordance with Government Code 53069.85, and all other applicable law, the Contractor agrees to forfeit and pay the Agency the amount of Five Hundred Dollars ($500.00) per day for each and every day of unauthorized delay beyond the completion date, which shall be deducted from any monies due the Contractor. This payment shall be considered liquidated damages. Contractor agrees that such liquidated damages are reasonable under the circumstances existing at the time of execution of the contract, that such liquidated damages are to compensate Agency for losses that are difficult to measure and that such damages are not a penalty.
Failure of the Contractor to perform any covenant or condition contained in the Contract Documents within the time period specified shall constitute a material breach of this Contract entitling the Agency to terminate the Contract unless the Contractor applies for, and receives, an extension of time in accordance with the procedures set forth in Section 6-4.
Failure of the Agency to insist upon the performance of any covenant or conditions within the time period specified in the Contract Documents shall not constitute a waiver of the Contractor’s duty to complete performance within the designated periods unless the Agency has executed a waiver in writing.
The Agency’s agreement to waive a specific time provision or to extend the time for performance shall not constitute a waiver of any other time provision contained in the Contract Documents.
SECTION E – Page 18
STANDARD SPECIFICATIONS
Failure of the Contractor to complete performance promptly within the additional time authorized in a waiver or extension of time agreement shall constitute a material breach of this Contract entitling the Agency to terminate this agreement.
The Contractor shall not be deemed in breach of this Contract and no forfeiture due to delay shall be made because of any delays in the completion of the Work due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor provided the Contractor requests an extension of time in accordance with the procedures set forth in Section 6-4. Unforeseeable causes of delay beyond the control of the Contractor shall include acts of God, acts of a public enemy, acts of the government, acts of the Agency, or acts of another contractor in the performance of a contract with the Agency, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and weather, or delays of subcontractors due to such causes, or delays caused by failure of the owner of a utility to provide for removal or relocation of existing utility facilities. Delays caused by actions or neglect of Contractor or his/her agents, servants, employees, officers, subcontractors, directors, or of any party contracting to perform part of all of the Work or to supply any equipment or materials shall not be excusable delays. Excusable delays (those beyond the Contractor’s control) shall not entitle the Contractor to any additional compensation. The sole recourse of the Contractor shall be to seek an extension of time.
6-10 DISPUTES AND CLAIMS
6-10.1 GENERAL
Any and all decisions made on appeal pursuant to this Subsection 6-10 shall be in writing. Any “decision” purportedly made pursuant to this Subsection 6-10 that is not in writing shall not be binding upon the Agency and should not be relied upon by the Contractor.
Nothing in this subsection shall be considered as relieving the Contractor from his/her duty to file the notice required under Subsection 6-11 or other duties required by the Contract Documents. 6-10.2 ADMINISTRATIVE REVIEW
Request for review made to the Construction Inspector or Project Engineer may be either oral or written.
Request for review made to the City Engineer shall be made in writing with supporting evidence attached.
The Contractor shall submit each request for review within twenty-one (21) calendar days of receipt of the decision that he/she is requesting.
Prior to demand for arbitration, the Contractor shall exhaust his/her administrative remedies by attempting to resolve his/her dispute or claim with Agency`s staff in the following sequence:
1. Project Manager
2. City Engineer
Should the Project Manager fail to address the Contractor’s request for review of a disputed decision within fourteen (14) calendar days after receiving such request, the Contractor may proceed directly to the City Engineer. At the option of the Agency, the person to whom the request for review is directed may elect to take such request to a higher level and the Contractor’s request shall be deemed to be properly submitted to such higher level.
SECTION E – Page 20
STANDARD SPECIFICATIONS
The City Engineer shall address disputes or claims within twenty eight (28) calendar days after receiving such request and all necessary supporting data. The City Engineer’s decision on the dispute or claim shall be the Agency’s final decision.
6-10.3 ARBITRATION
Claims and disputes arising under or related to the performance of the contract shall be resolved in arbitration unless the Agency and the Contractor agree in writing, after the claim or dispute has arisen, to waive arbitration and to have the claim or dispute litigated in court of competent jurisdiction. Arbitration shall be conducted, to the extent feasible, pursuant to Chapter 3 (Sections 301-393, inclusive) of Division 2 of Title 1 of the California Code of Regulations except that references therein to the “State Contract Act” shall be construed to mean “applicable law” and “Public Agency”, or “Department” shall be construed to mean “Agency” as defined in Subsection 1.2. The arbitration decision shall be decided under and in accordance with California law, supported by substantial evidence, and in writing, contain the basis for the decision, findings of fact, and conclusions of law.
Arbitration shall be initiated by a Demand for Arbitration. The Contractor shall request a Demand for Arbitration not later than one hundred eighty (180) calendar days after the date of the final written decision of the Agency on the claim or dispute.
All contracts valued at more than $15,000 between the Contractor and his/her Subcontractors and Suppliers shall include a provision that the Subcontractors and Suppliers shall be bound to the Contractor to the same extent that the Contractor is bound to the Agency by all terms and provisions of the Contract, including these arbitration provisions.
6-11 NOTICE OF POTENTIAL CLAIM
The Contractor shall not be entitled to the payment of any additional compensation for any cause, including any act, or failure to act, by the Engineer, or the happening of any event, thing or occurrence, unless the Contractor shall have given the Engineer due notice in writing, of the potential claim as hereinafter specified, provided, however, that compliance with this Subsection 6-11 shall not be a prerequisite as to any claim that is based on differences in measurements or errors of computation as to the Contract quantities.
Additionally, this Subsection 6-11 shall not supersede the specific notice and protest requirements of Subsection 2-9 “Changed Conditions” and Subsection 6-3.2 “Contract Time Accounting” respectively.
A written notice of potential claim shall set forth the reasons the Contractor believes additional compensation will or may be due, the nature of the costs involved, and, insofar as possible, the amount of the potential claim. A notice as above required must have been given to the Engineer prior to the time that the Contractor shall have performed the Work giving rise to the potential claim for additional compensation, if based on an act or failure to act by the Engineer, or in all other cases within fifteen (15) days after the happening of the event, thing or occurrence giving rise to the potential claim.
It is the intention of this Subsection 6-11 that differences between the parties arising under and by the virtue of the Contract be brought to the attention of the Engineer at the earliest possible time in order that such matters may be settled, if possible, or other appropriate action promptly taken. The Contractor hereby agrees that he/she shall have no right to additional compensation for any claim that may be based on any such act, failure to act, event, thing or occurrence for which no written notice of potential claim as herein required was filed.
SECTION E – Page 21
STANDARD SPECIFICATIONS
SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT
7-3.2 PARTIAL AND FINAL PAYMENT
The closure date for period progress payments will be the twenty-fifth day of each month. Authorization to pay is commonly received on the second Wednesday of the following month. The Agency requires four to six weeks to review all progress payments, issue payment checks, present progress payment to Council for approval, and release payment to contractor. However, payments will be withheld pending receipt of any outstanding reports required by the Contract Documents. In addition, the final progress payment will not be released until the Contractor returns the control set of plans and specifications showing the as-built conditions.
The full five (5) percent retention will be deducted from all payments. The final retention will be authorized for payment thirty five (35) days after the date of recordation of the Notice of Completion.
The Contractor may substitute securities for any monies withheld by the Agency to ensure performance under the Contract as provided in Public Contract Code Sections 10263 and 22300. 7-3.3 DELIVERED MATERIALS
Materials and equipment delivered but not incorporated into the Work will not be included in the estimate for progress payment.
7-3.4 Mobilization
Mobilization and demobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, and incidentals to the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, and financing prior to beginning work on the various contract items on the project site. Mobilization shall also include the time, materials, and labor to move the necessary construction equipment to and from the site, supervisory time on the job by the Contractor’s personnel to keep the construction site in a safe condition, and all other related work as required at all times and for all non-working days during the construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials.
Contractor shall provide traffic control per California Temporary Traffic Control Handbook. Contractor must maintain access for visitors to the properties. One driveway must always remain open and accessible.
The cost for traffic control shall be paid per a separate lump sum bid item.
Payment for Mobilization shall be included in the other items of work and shall be considered full compensation and include but not be limited to, obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to, utility
SECTION E – Page 22
STANDARD SPECIFICATIONS
companies, private and public agencies and the City of Los Alamitos; and complying with the requirements specified in those licenses and permits; coordination, field office facility, implementation of Best Management Practices, and incidentals necessary to perform all related items of work.
SECTION F – Page 23
SPECIAL PROVISIONS
ON-CALL SERVICES FOR CONCRETE REMEDIATION
CIP NO. 22/23-08
TECHNICAL PROVISIONS
PART 3 - CONSTRUCTION METHODS
SECTION 300 – EARTHWORK
300-1 CLEARING AND GRUBBING
300-1.1 General.
In addition to the work outlined in Subsection 300-1 of the Standard Specifications, the following items of work are included in other bid items and no additional payment will be made therefore.
(1) Protection of utilities, trees, fences, walls and other facilities within the construction zone, except those specifically directed by the Engineer to be removed or relocated.
(2) Clearing and removal of debris from site of work.
(3) Delay in work necessary to accommodate utility relocations by others. (4) Other items of work as directed in these specifications. 300-1.3 Removal and Disposal of Material.
300-1.2 Root Pruning and Tree Trimming.
300-1.2.1 Protection of Existing Trees to Remain.
All trees to remain in place within the limits of work shall be protected from damage by workmen, equipment, and operations. Insofar as prosecution of the work allows, following removal of surrounding pavements, etc., the root area beneath the tree drip line shall be protected from damage, including compaction. Protection shall include temporary fencing, barricades, etc.
Warning tape will not be considered sufficient.
300-2 UNCLASSIFIED EXCAVATION
It is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per Section 400. All damages to these items shall be fixed to the satisfaction of City Engineer without any additional compensation.
SECTION F – Page 24
SPECIAL PROVISIONS
PART 4 – EXISTING IMPROVEMENTS
SECTION 400 - PROTECTION AND RESTORATION
400-1 GENERAL
Replace the second paragraph with the following:
The Contractor shall relocate, repair, replace or reestablish all existing improvements within the project limits (e.g., curbs, sidewalks, driveways, fences, walls, sprinkler systems, signs, utility installations, pavements, structures, survey monuments, landscaping, etc.) that are damaged or removed as a result of the Contractor’s operations or as required by the plans and specifications.
All existing improvements, either within the right-of-way or not, including irrigation lines that are damaged by actions of the Contractor, shall be restored by the Contractor to their original or better condition at the Contractor’s expense.
The Contractor shall mark, as approved by the Engineer, all survey monuments, manholes, valves, substructures, or other items that are visible on the surface and will be covered by his operations.
This shall be completed prior to the start of that operation and approved by the Engineer.
Existing traffic striping, pavement markings, and curb markings shall also be considered as existing improvements and the Contractor shall repaint or replace, at the Contractor’s expense, such striping or markings (except for traffic striping and pavement markings within the limits of the Work) if damaged or if their reflectivity is reduced due to construction operations. 400-3 PAYMENT
Replace the last sentence of the first paragraph with the following:
All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or reestablishing existing improvements shall be included in the Bid.
SECTION 402 - UTILITIES
Add the following Subsections:
402-1.1.1 MANDATORY NOTIFICATION PRIOR TO EXCAVATION
The Contractor’s attention is direct to Section 4215.5 through 4217 of the Government Code of the State of California. This requires that two (2) working days prior to commencing any excavation “Underground Service Alert of Southern California” (USA) shall be notified by phone, toll free 1- 800-227-2600, for the assignment of an Inquiry Identification Number.
Construction Contractor shall contact all utility companies (e.g. gas company, electric company, telephone company, cable company, water company, and refuse collectors) at least five (5) working days prior to commencing work and shall verify the location of any known utilities and determine whether or not a representative of each company will be present during excavation:
Additionally, the Contractor shall also notify local entities of his/her schedule fourteen (14) days prior to commencing work, including, local law enforcement agencies, the Post Office, Public Schools, and Bus Companies.
No excavation shall commence unless the Contractor has obtained the USA Inquiry
SECTION F – Page 25
SPECIAL PROVISIONS
Identification Number.
402-1.1.2 ACCURACY OF UTILITIES INFORMATION
The locations of known existing major utilities, whether above ground or underground, are indicated on the plans. Information and data reflected in the Contract Documents with respect to underground and above ground utilities at or contiguous to the site is based upon information and data furnished to the City and the Engineer by the owners of such utilities, and the City does not assume responsibility for the accuracy or completeness thereof. The Contractor shall take all possible precautions for the protection of unforeseen utility lines to provide for uninterrupted service and to provide such special protection as may be necessary.
The Contractor shall be responsible for determining the location and depth of all underground facilities, including service connections, which may affect or be affected by his/her operations and he/she shall include the cost to pothole all utilities within the limits of work in his/her bid. If an existing utility line, which has been marked by Underground Service Alert or is shown on the plans, is damaged by the Contractor, the Contractor shall repair the line and bear the cost thereof.
Contractor shall be aware that electrical conduits between street and traffic lights may exist beneath pavement and/or sidewalk in areas where such lights are in place and that said conduits are not shown on these plans.
In the event that the Contractor damages any existing utility lines that are not shown, shown incorrectly or the locations of which are not made known to the Contractor prior to excavation, a telephone call and written report shall be made immediately to the Utility owner, the Engineer, and to the City. If directed by the City, the Contractor shall make repairs under the provisions for changes and extra work contained in SECTION 3 – CONTROL OF THE WORK of the SSPWC Standard Specification.
SECTION 404 - COLD MILLING
404-12 Payment
Measurement and Payment for Trip Hazard Removal (1/4” to 2”) shall be paid per Inch Foot (in-ft) and shall include full compensation for labor, materials, equipment, mobilization, traffic control, grinding /shaving of sidewalk, meeting OSHA requirements, and any other incidentals required for removing trip hazards and no additional compensation shall be made therefor.
SECTION F – Page 26
SPECIAL PROVISIONS
SECTION F – Page 27
SPECIAL PROVISIONS
PART 6 – TEMPORARY TRAFFIC CONTROL
600 ACCESS
600-1 General
Add the following:
600-1.1 Parking Restrictions and Posting for Tow Away
No Parking signs, posted by the Contractor, shall be of heavy card stock and not less than 1.75 square feet of surface area on the face. Background color shall be white and letters shall be printed in red water resistant ink except day, date, and time of restriction may be printed in black water resistant ink. The signs shall be printed with the words “Tow Away” and “No Parking” with a character height of not less than 2.75 inches and a stroke width of not less than
0.5 inches. The day, dated, and time of the particular restriction shall be printed or attached below the above mentioned wording in characters of not less than 2.0 inches in height and 0.4 inches in stroke width. The day of the week shall be written out or properly abbreviated with three to four letters; date or dates or restriction shall be listed completely; the beginning and ending times shall be clearly listed on the sign.
Signs shall be mounted such that the wording “No Parking” are at an elevation at least three feet above the adjacent flowline. Signs may be tied with string to trees and power poles, taped to existing sign poles, or mounted to stakes or barricades as provided by the Contractor. The signs shall be placed as needed to control the parking of cars within the construction zone; signs shall be placed at intervals of 75 feet or less along each side of the roadway.
Signs shall be posted and maintained by the Contractor for a period of 72 hours prior to the restrictions becoming effective. The Contractor may only post parking restrictions that are effective for the duration of the Work. Upon completion of the Work, the Contractor shall promptly and completely remove and dispose all signs, stakes, and barricades. The Contractor shall promptly reset or replace all damaged or defective signs.
The Contractor shall be fully responsible for the adequate removal of all parked cars. The Contractor shall coordinate the removal of all vehicles with the Sheriff Department. The
SECTION F – Page 28
SPECIAL PROVISIONS
Contractor shall notify the Sheriff Communications Center upon posting of the parking restrictions for a particular street. For removal of parked vehicles, the Contractor shall notify the Sheriff Communications Center not less than two hours prior to the needed removal, stating the address nearest the parked vehicle, make, model, color and license number. The City shall not be responsible for any delay or additional costs associated with the removal of parked cars that obstruct the construction operation.
If a vehicle owner successfully contests a towing citation in court, and their citation is dismissed for causes related to the Contractor’s failure to perform the requirements of this section, the Contractor shall reimburse the City for the cost of any claims associated with the towing citation.
DEVIATIONS FROM THE REQUIREMENTS OF THIS SUBSECTION WILL BE PERMITTED ONLY ON PRIOR CONSENT OF THE ENGINEER. FAILURE OF THE
CONTRACTOR TO ADHERE TO THE REQUIREMENTS OF THIS SUBSECTION, OR
FAILURE OF THE CONTRACTOR TO COMPLETE HIS DAILY SCHEDULE ONCE “TEMPORARY NO PARKING” SIGNS HAVE BEEN POSTED, WILL RESULT IN DAMAGES BEING SUSTAINED BY THE CITY. SUCH DAMAGES ARE, AND WILL CONTINUE TO BE, IMPRACTICABLE AND EXTREMELY DIFFICULT TO DETERMINE.
FOR EACH OCCURRENCE OF A VIOLATION, AS PROVIDED HEREIN, THE
CONTRACTOR SHALL PAY TO THE AGENCY, OR HAVE WITHHELD FROM MONIES DUE TO IT, THE SUM OF $1,000.00.
EXECUTION OF THE CONTRACT SHALL CONSTITUTE AGREEMENT BY THE AGENCY AND CONTRACTOR THAT $1,000.00 PER VIOLATION IS THE MINIMUM
VALUE OF THE COST AND ACTUAL DAMAGE CAUSED, THAT SUCH SUM SHALL
NOT BE CONSTRUED AS A PENALTY, AND THAT SUCH SUM MAY BE DEDUCTED FROM PAYMENTS DUE THE CONTRACTOR.
600-1.2 STREET CLOSURE, DETOURS, BARRICADES
Add the following:
All traffic control barricades, signs and devices used by the Contractor shall, as a minimum, conform to the “Manual of Traffic Controls for Construction and Maintenance Work Zones,” adopted by and in current use by the State of California, Department of Transportation.
Channelization devices shall be spaced no greater than fifty (50) feet apart. The Contractor shall take additional precautions as he/she may find necessary under the circumstances.
Should the Contractor fail to provide adequate traffic control or safety barricades, and in the event a responsible individual cannot be located or refuses to perform, the Agency will at its option place needed devices or engage a private firm to place and maintain said barricades, which will be charged to the Contractor directly.
Temporary traffic channelization shall be accomplished with delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed on finished pavement surfaces which are to remain.
Full street closures will not be allowed prior to City Council approval. 601-1.3 Measurement and Payment.
Measurement and Payment for Traffic Control shall be at the lump sum (LS) bid price and shall
SECTION F – Page 50
SPECIAL PROVISIONS
include but not limited to furnishing all labor, tools, material, equipment, signage, TTC zone devices, channelizing devices, changeable message sign, and incidentals for doing all work involved in preparing traffic control plans and implementing traffic control, and no additional compensation will be allowed therefore.
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 23, 2023 ITEM NUMBER: 11F
To: Mayor Tanya Doby & Members of the City Council
Presented By: Ron Noda, Development Services Director
Subject: Community Development Block Grant (CDBG) Application Resolution for Fiscal Year 2024/2025
SUMMARY
This item recommends adoption of a Resolution of approval for the Fiscal Year 2024/2025 Community Development Block Grant (CDBG) project application with the County of Orange.
RECOMMENDATION
Adopt amended Resolution No. 2023-22, entitled “A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LOS ALAMITOS, CALIFORNIA APPROVING THE CITY’S PARTICIPATION IN THE FISCAL YEAR 2024/2025 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM WITH THE COUNTY OF ORANGE.”
BACKGROUND
The Orange County Housing and Community Development & Homeless Prevention Department administers and disperses Federal Community Development Block Grant (CDBG) monies for smaller cities such as Los Alamitos. The Program provides federal funds to cities with populations under 50,000 for programs that are targeted towards community development. The funds are commonly used for neighborhoods that have a substantial number of low, very low, and extremely low-income residents, and can be used for Senior or ADA (Americans with Disabilities Act) projects as well.
DISCUSSION
The City regularly submits applications to Orange County Community Resources for CDBG funds through the program. Larger cities apply directly to the Federal Government for such funds. As a smaller city, Los Alamitos seeks the oversight of the County when using such funds. The City of Los Alamitos has used such grants for years, often being awarded CDBG funds to improve public facilities within the City’s low income census tracts. If not an ADA project, or a project for seniors, the CDBG activities should serve residents within the City’s low income areas. In 2022-2023, CDBG funds were used for the renovation to create an all-inclusive ADA-compliant Sterns Park. During the current Fiscal Year 2023-2024, CDBG funds will be used for the renovation to create an ADA-compliant Labourdette Park.
CDBG funds are pursued through competitive grant applications submitted to the County. The request for approval of this year’s resolution will require a City match on the resolution of 20% to fulfill the requirement on the grant application for fund requests that are over $150,000.00.
The public was notified of a community meeting that was held during the September 13, 2023 Planning Commission meeting and through an advertisement placed in the Event News Enterprise on September 13, 2023. Here is a suggestion from the Planning Commission for next year’s project:
Project Approximate Cost
Street Repair:
- Maple Street from Green Avenue to Farquhar Avenue
- Howard Avenue from Maple Street to Reagan Street
- Howard Avenue from Maple Street to Bloomfield
Street
Street Repair - $350,000
To include a 20% City match
FISCAL IMPACT
Should the County of Orange approve the City's application, future expenditures of 20% matching funds (cost depending on the projects selected above) will be reflected in next year's annual Capital Improvement Plan budget. The matching funds are anticipated to be drawn from the City’s General Fund, which was historically drawn from Gas Tax or the City’s General Fund.
Attachment: 1. Resolution No. 2023-22 - CDBG Participation
RESOLUTION NO. 2023-22
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
LOS ALAMITOS, CALIFORNIA APPROVING THE CITY’S
PARTICIPATION IN THE FISCAL YEAR 2024/2025
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
PROGRAM WITH THE COUNTY OF ORANGE
WHEREAS, it is the intent of the City of Los Alamitos to participate in the timely filing of an application with the County of Orange for a grant authorized under the Housing and Community Development Act of 1974; and,
WHEREAS, the Housing and Community Development Act of 1974, as amended, authorizes cities under 50,000 in population to enter into cooperative agreements with the County in which they are located for the purpose of undertaking essential community development activities; and,
WHEREAS, the City of Los Alamitos will be submitting an application under FY 2024-25 for the Public Facilities & Improvements Request for Proposal; and, WHEREAS, the City of Los Alamitos desires to accept the award of CDBG funds and authorizes the execution of the necessary agreements, contracts and amendments and other corresponding documentation to accept the CDBG funds.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LOS ALAMITOS, CALIFORNIA, DOES RESOLVE AS FOLLOWS:
SECTION 1. The City Council of the City of Los Alamitos, California, finds that the above recitals are true and correct.
SECTION 2. The City of Los Alamitos hereby accepts the award of CDBG funds through the County’s Urban Counties Program, which will be used to support the City of Los Alamitos’ Public Facilities & Improvements Apartment Row Street Repair Project (Cont’d).
SECTION 3. The City Council does hereby approve and adopt the selection of the following project funding request and directs that an application reflecting this project, be submitted to the County of Orange:
Project Approximate Cost
Street Repair:
- Maple Street from Green Avenue to Farquhar
Avenue
- Howard Avenue from Maple Street to
ReaganStreet
- Howard Avenue from Maple Street to Bloomfield
Street.
Street Repair - $350,000
To include a 20% City match
CC RESO 2023-22
SECTION 4. The City of Los Alamitos authorizes the City Manager or his/her designee to execute, for and on behalf of the City of Los Alamitos, the necessary agreements(s) and/or any other documents or instruments required by the County and/or the United States Department of Housing and Urban Development for participation in the Urban Counties Program and/or for acceptance of the FY 2024-25 CDBG funds.
SECTION 5. The City Clerk shall certify as to the adoption of this Resolution.
PASSED, APPROVED, AND ADOPTED this 23rd day of October, 2023. ___________________________
Tanya Doby, Mayor
ATTEST:
_______________________________
Windmera Quintanar, MMC, City Clerk
APPROVED AS TO FORM:
_______________________________
Michael S. Daudt, City Attorney
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF LOS ALAMITOS )
I, Windmera Quintanar, MMC, City Clerk, of the City of Los Alamitos, do hereby certify that the foregoing Resolution was adopted at a regular meeting of the City Council held on the 23rd day of October 2023, by the following vote, to wit:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ABSTAIN: COUNCILMEMBERS:
_________________________________
Windmera Quintanar, MMC, City Clerk
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 23, 2023 ITEM NUMBER: 11G
To: Mayor Tanya Doby & Members of the City Council
Presented By: Ron Noda, Development Services Director
Subject: Reject Bid for the Bloomfield Neighborhood Street Rehabilitation Project (CIP No. 22/23-06)
SUMMARY
Construction bids were publicly opened for the Bloomfield Neighborhood Street Rehabilitation Project (CIP No. 22/23-06) on September 7, 2023 with five bids received. The submitted acceptable bids surpassed a feasible budget. Therefore, staff is recommending that Council reject the bid submitted and go back out for additional bids.
RECOMMENDATION
Reject all bids received for the Bloomfield Neighborhood Street Rehabilitation Project (CIP No. 22/23-06).
BACKGROUND
The City of Los Alamitos is being provided $200,000 in federal Coronavirus Response and Relief Supplemental Appropriations Act of 2021 (CRRSAA) funding through the 2021 Pavement Management Relief Funding (PMRF) Program.
The City proposes to grind and overlay Bloomfield Street from Katella Avenue to Florista Street as part of the City’s ongoing pavement management program. The project will also replace damaged curb & gutter and lifted sidewalk to correct drainage. ADA curb ramps will be modified to current codes as necessary for accessibility.
DISCUSSION
Construction bids were publicly opened for the the Bloomfield Neighborhood Street Rehabilitation Project (CIP No. 22/23-06) on September 07, 2023. Five bids were received in the amount of $242,993. The bid amount exceeds the appropriated construction budget of $200,000 for construction costs. The lowest bid was $208,000, however, the bid was missing a signed Non-Collussion Affidavit form and could not be counted as a complete bid package.
Therefore, staff is recommending that City Council reject the bid submitted and go back out for additional bids.
FISCAL IMPACT
None.
Attachment: 1. CIP 22/23-06 Bloomfield Street Improvement Bid Breakdown
BLOOMFIELD STREET IMPROVEMENT PROJECT
SPECIFICATION NO. CIP 22/23-06
BID OPENING: SEPTEMBER 7, 2023 AT 11 AM
Hardy & Harper, Inc. Onyx Paving Company,
Inc. Sequel Contractor, Inc. All American Asphalt R.J. Noble Company ITEM DESCRIPTION QTY. UNITS UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. COST COST COST COST COST COST COST COST COST COST
1 Mobilization 1 LS 9,720.00 $ 9,720.00 9,715.00 $9,715.00 15,500.00 $15,500.00 28,000.00 $28,000.00 56,000.00 $56,000.00 2 Traffic Control 1 LS 39,424.00 $ 39,424.00 37,000.00 $37,000.00 22,000.00 $22,000.00 37,766.80 $37,766.80 18,000.00 $18,000.00 3 Cold Mill Existing Pavement 1.5-Inch
Uniform Depth 33,780 SF 0.50 $ 16,890.00 0.55 $18,579.00 0.55 $18,579.00 0.79 $26,686.20 0.92 $31,077.60 4 Remove and Construct 7.5-Inch Fill
Depth Asphalt Concrete Pavement 76 TN 265.00 $ 20,140.00 272.00 $20,672.00 370.00 $28,120.00 250.00 $19,000.00 380.00 $28,880.00 5 Construct 1.5-Inch Thick ARHM
Overlay 310 TN 190.00 $ 58,900.00 172.00 $53,320.00 225.00 $69,750.00 220.00 $68,200.00 195.00 $60,450.00 6 Adjust to Grade (Item as Noted) 1 EA 1,296.00 $ 1,296.00 3,000.00 $3,000.00 4,000.00 $4,000.00 5,500.00 $5,500.00 3,650.00 $3,650.00 7 Install Signing and Striping Complete
per Plans 1 LS 15,700.00 $ 15,700.00 18,914.00 $18,914.00 18,500.00 $18,500.00 14,540.00 $14,540.00 24,000.00 $24,000.00 8 Remove and Replace Curb Ramp,
Type per Plan 4 EA 8,350.00 $ 33,400.00 11,000.00 $44,000.00 11,250.00 $45,000.00 10,000.00 $40,000.00 12,000.00 $48,000.00 9 Construct Handrail Per SPPWC Std
606-4 21 LF 335.00 $ 7,035.00 500.00 $10,500.00 570.00 $11,970.00 700.00 $14,700.00 420.00 $8,820.00 10 Install Detector Loop Complete Per
Plan 7 EA 785.00 $ 5,495.00 900.00 $6,300.00 1,000.00 $7,000.00 785.00 $5,495.00 825.00 $5,775.00 TOTAL $208,000.00 $222,000.00 $240,419.00 $259,888.00 $284,652.60 SCHEDULE TOTAL $208,000.00 $222,000.00 $240,419.00 $259,888.00 $284,652.60 PROJECT TOTAL $208,000.00 $222,000.00 $240,419.00 $259,888.00 $284,652.60
DEVELOPMENT SERVICES DEPARTMENT
PUBLIC WORKS DIVISION
BLOOMFIELD STREET IMPROVEMENT PROJECT
SPECIFICATION NO. CIP 22/23-06
BID OPENING: SEPTEMBER 7, 2023 AT 11 AM
DEVELOPMENT SERVICES DEPARTMENT
PUBLIC WORKS DIVISION
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 23, 2023 ITEM NUMBER: 11H
To: Mayor Tanya Doby & Members of the City Council
Presented By: Ron Noda, Development Services Director
Subject: Purchase of one (1) 2024 Ford Super Duty F-550 Stakebed Truck via the Sourcewell Competitive Purchasing Program from National Auto Fleet Group Contract No. 091521-NAF
SUMMARY
This item seeks approval to purchase one (1) 2024 Ford Super Duty F-550 Stakebed Truck via the Sourcewell Competitive Purchasing Program at a cost of $83,524.46.
RECOMMENDATION
Approve the purchase of one (1) 2024 Ford Super Duty F-550 DRW Stakebed Truck from National Auto Fleet Group via Sourcewell Contract No. 091521-NAF for an amount not to exceed $83,524.46.
BACKGROUND
The City’s fleet is currently made up of fleet assigned to the Public Works Division, the Police Department, the Recreation & Community Services Department, and the Administration Department. These vehicles range from patrol vehicles utilized by the Police Department to heavy commercial trucks operated by the Public Works Division within the Development Services Department.
In 2023, Council adopted Resolution No. 2013-07 which outlined the Vehicle & Equipment Replacement Policy. The policy established guidelines for replacement based on a number of factors including, but not limited to, age, mileage, mechanical condition, maintenance costs.
The policy also established targeted replacement cycles for vehicles and equipment.
As a result of the financial challenges faced in previous years, the City has delayed the replacement of fleet and equipment. This has inadvertently affected the level of service provided to the community, from response time for service calls by the Police Department to productivity and efficiency during street, sidewalk, and roadway maintenance projects completed by the Public Works Division.
DISCUSSION
This item seeks approval for the purchase of one (1) 2024 Ford Super Duty F-550 stakebed truck from National Auto Fleet Group (NAFG) via the Sourcewell Competitive Purchasing Program. The addition of this truck will provide the Public Works Division with the ability to operate a dependable vehicle when completing tasks during day-to-day and emergency
operations.
Sourcewell Competitive Purchasing Program
Sourcewell, formerly known as the National Joint Power Alliance (NJPA), is a national cooperative purchasing agency that facilitates the procurement of goods for members. After 40 years of service, Sourcewell continues to offer contract purchasing solutions to all government agencies, public and private schools/colleges, tribal governments and nonprofit organizations.
Utilizing Sourcewell’s services does not incur any additional costs for the City. Supplemental services that the City may utilize at no additional cost include a review of quotes provided, which will ensure the figures presented accurately and reflect the costs described in the awarded contract with Sourcewell.
Under Section 2.60.110 of the Los Alamitos Municipal Code (LAMC), the City’s purchasing ordinance allows the City to “piggyback” off another public agency or government entity, which has selected the vendor using competitive bidding procedures substantially the same as or similar to those normally utilized by the city for the acquisition of such materials, supplies, equipment, or services. If such a determination is made, the City Manager or City Council, as applicable, may proceed to purchase the materials, supplies, equipment, or services at a price equivalent to that offered to the acquiring agency.
As a member of Sourcewell, the City has the ability to utilize Sourcewell awarded contracts.
The City’s Sourcewell Membership Identification number is ID#060618-EFM.
National Auto Fleet Group (NAFG)
Following a competitive bid process in September 2021, out of 13 bids received for Request for Proposal (RFP#091521), NAFG secured a contract with Sourcewell for the procurement of vehicles, cars, vans, SUVs and light trucks with related equipment, accessories and services.
NAFG’s contract with Sourcewell remains in effect until November 8, 2025.
FISCAL IMPACT
The purchase of one (1) 2024 Ford Super Duty F-550 stakebed truck from NAFG via Sourcewell Contract No. 091521-NAF will not exceed $83,524.46. Funding for this purchase will be expended out of the Vehicle and Equipment Replacement Account via Fund 50.
Attachment: 1. Sourcewell Quote ID#25558 R2 (Stakebed Truck)
2. Sourcewell Proposal No. 091521 (Executed Agreement with NAFG)
3. Sourcewell Proposal No. 091521 (Request for Proposals (RFP))
4. Sourcewell Proposal No. 091521 (Proposal Opening Record)
5. Resolution No. 2013-07 - Vehicle Replacement Policy
091521-NAF
Rev. 3/2021 1
Solicitation Number: RFP #091521
CONTRACT
This Contract is between Sourcewell, 202 12th Street Northeast, P.O. Box 219, Staples, MN 56479 (Sourcewell) and 72 Hour LLC dba: National Auto Fleet Group, 490 Auto Center Drive, Watsonville, CA 95076 (Supplier).
Sourcewell is a State of Minnesota local government unit and service cooperative created under the laws of the State of Minnesota (Minnesota Statutes Section 123A.21) that offers cooperative procurement solutions to government entities. Participation is open to eligible federal, state/province, and municipal governmental entities, higher education, K-12 education, nonprofit, tribal government, and other public entities located in the United States and Canada.
Sourcewell issued a public solicitation for Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories from which Supplier was awarded a contract.
Supplier desires to contract with Sourcewell to provide equipment, products, or services to Sourcewell and the entities that access Sourcewell’s cooperative purchasing contracts (Participating Entities).
1. TERM OF CONTRACT
A. EFFECTIVE DATE. This Contract is effective upon the date of the final signature below.
B. EXPIRATION DATE AND EXTENSION. This Contract expires November 8, 2025, unless it is cancelled sooner pursuant to Article 22. This Contract may be extended one additional year upon the request of Sourcewell and written agreement by Supplier.
C. SURVIVAL OF TERMS. Notwithstanding any expiration or termination of this Contract, all payment obligations incurred prior to expiration or termination will survive, as will the following: Articles 11 through 14 survive the expiration or cancellation of this Contract. All rights will cease upon expiration or termination of this Contract.
2. EQUIPMENT, PRODUCTS, OR SERVICES
A. EQUIPMENT, PRODUCTS, OR SERVICES. Supplier will provide the Equipment, Products, or Services as stated in its Proposal submitted under the Solicitation Number listed above.
091521-NAF
Rev. 3/2021 2
Supplier’s Equipment, Products, or Services Proposal (Proposal) is attached and incorporated into this Contract.
All Equipment and Products provided under this Contract must be new and the current model.
Supplier may offer close-out or refurbished Equipment or Products if they are clearly indicated in Supplier’s product and pricing list. Unless agreed to by the Participating Entities in advance, Equipment or Products must be delivered as operational to the Participating Entity’s site.
This Contract offers an indefinite quantity of sales, and while substantial volume is anticipated, sales and sales volume are not guaranteed.
B. WARRANTY. Supplier warrants that all Equipment, Products, and Services furnished are free from liens and encumbrances, and are free from defects in design, materials, and workmanship.
In addition, Supplier warrants the Equipment, Products, and Services are suitable for and will perform in accordance with the ordinary use for which they are intended. Supplier’s dealers and distributors must agree to assist the Participating Entity in reaching a resolution in any dispute over warranty terms with the manufacturer. Any manufacturer’s warranty that extends beyond the expiration of the Supplier’s warranty will be passed on to the Participating Entity.
C. DEALERS, DISTRIBUTORS, AND/OR RESELLERS. Upon Contract execution and throughout the Contract term, Supplier must provide to Sourcewell a current means to validate or authenticate Supplier’s authorized dealers, distributors, or resellers relative to the Equipment, Products, and Services offered under this Contract, which will be incorporated into this Contract by reference. It is the Supplier’s responsibility to ensure Sourcewell receives the most current information.
3. PRICING
All Equipment, Products, or Services under this Contract will be priced at or below the price stated in Supplier’s Proposal.
When providing pricing quotes to Participating Entities, all pricing quoted must reflect a Participating Entity’s total cost of acquisition. This means that the quoted cost is for delivered Equipment, Products, and Services that are operational for their intended purpose, and includes all costs to the Participating Entity’s requested delivery location.
Regardless of the payment method chosen by the Participating Entity, the total cost associated with any purchase option of the Equipment, Products, or Services must always be disclosed in the pricing quote to the applicable Participating Entity at the time of purchase.
A. SHIPPING AND SHIPPING COSTS. All delivered Equipment and Products must be properly packaged. Damaged Equipment and Products may be rejected. If the damage is not readily apparent at the time of delivery, Supplier must permit the Equipment and Products to be
091521-NAF
Rev. 3/2021 3
returned within a reasonable time at no cost to Sourcewell or its Participating Entities.
Participating Entities reserve the right to inspect the Equipment and Products at a reasonable time after delivery where circumstances or conditions prevent effective inspection of the Equipment and Products at the time of delivery. In the event of the delivery of nonconforming Equipment and Products, the Participating Entity will notify the Supplier as soon as possible and the Supplier will replace nonconforming Equipment and Products with conforming Equipment and Products that are acceptable to the Participating Entity.
Supplier must arrange for and pay for the return shipment on Equipment and Products that arrive in a defective or inoperable condition.
Sourcewell may declare the Supplier in breach of this Contract if the Supplier intentionally delivers substandard or inferior Equipment or Products.
B. SALES TAX. Each Participating Entity is responsible for supplying the Supplier with valid taxexemption certification(s). When ordering, a Participating Entity must indicate if it is a taxexempt entity.
C. HOT LIST PRICING. At any time during this Contract, Supplier may offer a specific selection of Equipment, Products, or Services at discounts greater than those listed in the Contract.
When Supplier determines it will offer Hot List Pricing, it must be submitted electronically to Sourcewell in a line-item format. Equipment, Products, or Services may be added or removed from the Hot List at any time through a Sourcewell Price and Product Change Form as defined in Article 4 below.
Hot List program and pricing may also be used to discount and liquidate close-out and discontinued Equipment and Products as long as those close-out and discontinued items are clearly identified as such. Current ordering process and administrative fees apply. Hot List Pricing must be published and made available to all Participating Entities.
4. PRODUCT AND PRICING CHANGE REQUESTS
Supplier may request Equipment, Product, or Service changes, additions, or deletions at any time. All requests must be made in writing by submitting a signed Sourcewell Price and Product Change Request Form to the assigned Sourcewell Supplier Development Administrator. This approved form is available from the assigned Sourcewell Supplier Development Administrator.
At a minimum, the request must:
x Identify the applicable Sourcewell contract number;
x Clearly specify the requested change;
x Provide sufficient detail to justify the requested change;
091521-NAF
Rev. 3/2021 4
x Individually list all Equipment, Products, or Services affected by the requested change, along with the requested change (e.g., addition, deletion, price change); and x Include a complete restatement of pricing documentation in Microsoft Excel with the effective date of the modified pricing, or product addition or deletion. The new pricing restatement must include all Equipment, Products, and Services offered, even for those items where pricing remains unchanged.
A fully executed Sourcewell Price and Product Change Request Form will become an amendment to this Contract and will be incorporated by reference.
5. PARTICIPATION, CONTRACT ACCESS, AND PARTICIPATING ENTITY REQUIREMENTS
A. PARTICIPATION. Sourcewell’s cooperative contracts are available and open to public and nonprofit entities across the United States and Canada; such as federal, state/province, municipal, K-12 and higher education, tribal government, and other public entities.
The benefits of this Contract should be available to all Participating Entities that can legally access the Equipment, Products, or Services under this Contract. A Participating Entity’s authority to access this Contract is determined through its cooperative purchasing, interlocal, or joint powers laws. Any entity accessing benefits of this Contract will be considered a Service Member of Sourcewell during such time of access. Supplier understands that a Participating Entity’s use of this Contract is at the Participating Entity’s sole convenience and Participating Entities reserve the right to obtain like Equipment, Products, or Services from any other source.
Supplier is responsible for familiarizing its sales and service forces with Sourcewell contract use eligibility requirements and documentation and will encourage potential participating entities to join Sourcewell. Sourcewell reserves the right to add and remove Participating Entities to its roster during the term of this Contract.
B. PUBLIC FACILITIES. Supplier’s employees may be required to perform work at governmentowned facilities, including schools. Supplier’s employees and agents must conduct themselves in a professional manner while on the premises, and in accordance with Participating Entity policies and procedures, and all applicable laws.
6. PARTICIPATING ENTITY USE AND PURCHASING
A. ORDERS AND PAYMENT. To access the contracted Equipment, Products, or Services under this Contract, a Participating Entity must clearly indicate to Supplier that it intends to access this Contract; however, order flow and procedure will be developed jointly between Sourcewell and Supplier. Typically, a Participating Entity will issue an order directly to Supplier or its authorized subsidiary, distributor, dealer, or reseller. If a Participating Entity issues a purchase order, it may use its own forms, but the purchase order should clearly note the applicable Sourcewell
091521-NAF
Rev. 3/2021 5
contract number. All Participating Entity orders under this Contract must be issued prior to expiration or cancellation of this Contract; however, Supplier performance, Participating Entity payment obligations, and any applicable warranty periods or other Supplier or Participating Entity obligations may extend beyond the term of this Contract.
Supplier’s acceptable forms of payment are included in its attached Proposal. Participating Entities will be solely responsible for payment and Sourcewell will have no liability for any unpaid invoice of any Participating Entity.
B. ADDITIONAL TERMS AND CONDITIONS/PARTICIPATING ADDENDUM. Additional terms and conditions to a purchase order, or other required transaction documentation, may be negotiated between a Participating Entity and Supplier, such as job or industry-specific requirements, legal requirements (e.g., affirmative action or immigration status requirements), or specific local policy requirements. Some Participating Entities may require the use of a Participating Addendum; the terms of which will be negotiated directly between the Participating Entity and the Supplier. Any negotiated additional terms and conditions must never be less favorable to the Participating Entity than what is contained in this Contract.
C. SPECIALIZED SERVICE REQUIREMENTS. In the event that the Participating Entity requires service or specialized performance requirements not addressed in this Contract (such as ecommerce specifications, specialized delivery requirements, or other specifications and requirements), the Participating Entity and the Supplier may enter into a separate, standalone agreement, apart from this Contract. Sourcewell, including its agents and employees, will not be made a party to a claim for breach of such agreement.
D. TERMINATION OF ORDERS. Participating Entities may terminate an order, in whole or in part, immediately upon notice to Supplier in the event of any of the following events:
1. The Participating Entity fails to receive funding or appropriation from its governing body at levels sufficient to pay for the equipment, products, or services to be purchased; or
2. Federal, state, or provincial laws or regulations prohibit the purchase or change the Participating Entity’s requirements.
E. GOVERNING LAW AND VENUE. The governing law and venue for any action related to a Participating Entity’s order will be determined by the Participating Entity making the purchase.
7. CUSTOMER SERVICE
A. PRIMARY ACCOUNT REPRESENTATIVE. Supplier will assign an Account Representative to Sourcewell for this Contract and must provide prompt notice to Sourcewell if that person is changed. The Account Representative will be responsible for:
091521-NAF
Rev. 3/2021 6
x Maintenance and management of this Contract;
x Timely response to all Sourcewell and Participating Entity inquiries; and x Business reviews to Sourcewell and Participating Entities, if applicable.
B. BUSINESS REVIEWS. Supplier must perform a minimum of one business review with Sourcewell per contract year. The business review will cover sales to Participating Entities, pricing and contract terms, administrative fees, sales data reports, supply issues, customer issues, and any other necessary information.
8. REPORT ON CONTRACT SALES ACTIVITY AND ADMINISTRATIVE FEE PAYMENT A. CONTRACT SALES ACTIVITY REPORT. Each calendar quarter, Supplier must provide a contract sales activity report (Report) to the Sourcewell Supplier Development Administrator assigned to this Contract. Reports are due no later than 45 days after the end of each calendar quarter. A Report must be provided regardless of the number or amount of sales during that quarter (i.e., if there are no sales, Supplier must submit a report indicating no sales were made).
The Report must contain the following fields:
x Participating Entity Name (e.g., City of Staples Highway Department); x Participating Entity Physical Street Address;
x Participating Entity City;
x Participating Entity State/Province;
x Participating Entity Zip/Postal Code;
x Participating Entity Contact Name;
x Participating Entity Contact Email Address;
x Participating Entity Contact Telephone Number;
x Sourcewell Assigned Entity/Participating Entity Number; x Item Purchased Description;
x Item Purchased Price;
x Sourcewell Administrative Fee Applied; and
x Date Purchase was invoiced/sale was recognized as revenue by Supplier.
B. ADMINISTRATIVE FEE. In consideration for the support and services provided by Sourcewell, the Supplier will pay an administrative fee to Sourcewell on all Equipment, Products, and Services provided to Participating Entities. The Administrative Fee must be included in, and not added to, the pricing. Supplier may not charge Participating Entities more than the contracted price to offset the Administrative Fee.
The Supplier will submit payment to Sourcewell for the percentage of administrative fee stated in the Proposal multiplied by the total sales of all Equipment, Products, and Services purchased
091521-NAF
Rev. 3/2021 7
by Participating Entities under this Contract during each calendar quarter. Payments should note the Supplier’s name and Sourcewell-assigned contract number in the memo; and must be mailed to the address above “Attn: Accounts Receivable” or remitted electronically to Sourcewell’s banking institution per Sourcewell’s Finance department instructions. Payments must be received no later than 45 calendar days after the end of each calendar quarter.
Supplier agrees to cooperate with Sourcewell in auditing transactions under this Contract to ensure that the administrative fee is paid on all items purchased under this Contract.
In the event the Supplier is delinquent in any undisputed administrative fees, Sourcewell reserves the right to cancel this Contract and reject any proposal submitted by the Supplier in any subsequent solicitation. In the event this Contract is cancelled by either party prior to the Contract’s expiration date, the administrative fee payment will be due no more than 30 days from the cancellation date.
9. AUTHORIZED REPRESENTATIVE
Sourcewell's Authorized Representative is its Chief Procurement Officer.
Supplier’s Authorized Representative is the person named in the Supplier’s Proposal. If Supplier’s Authorized Representative changes at any time during this Contract, Supplier must promptly notify Sourcewell in writing.
10. AUDIT, ASSIGNMENT, AMENDMENTS, WAIVER, AND CONTRACT COMPLETE A. AUDIT. Pursuant to Minnesota Statutes Section 16C.05, subdivision 5, the books, records, documents, and accounting procedures and practices relevant to this Agreement are subject to examination by Sourcewell or the Minnesota State Auditor for a minimum of six years from the end of this Contract. This clause extends to Participating Entities as it relates to business conducted by that Participating Entity under this Contract.
B. ASSIGNMENT. Neither party may assign or otherwise transfer its rights or obligations under this Contract without the prior written consent of the other party and a fully executed assignment agreement. Such consent will not be unreasonably withheld. Any prohibited assignment will be invalid.
C. AMENDMENTS. Any amendment to this Contract must be in writing and will not be effective until it has been duly executed by the parties.
D. WAIVER. Failure by either party to take action or assert any right under this Contract will not be deemed a waiver of such right in the event of the continuation or repetition of the circumstances giving rise to such right. Any such waiver must be in writing and signed by the parties.
091521-NAF
Rev. 3/2021 8
E. CONTRACT COMPLETE. This Contract represents the complete agreement between the parties. No other understanding regarding this Contract, whether written or oral, may be used to bind either party.For any conflict between the attached Proposal and the terms set out in Articles 1-22 of this Contract, the terms of Articles 1-22 will govern.
F. RELATIONSHIP OF THE PARTIES. The relationship of the parties is one of independent contractors, each free to exercise judgment and discretion with regard to the conduct of their respective businesses. This Contract does not create a partnership, joint venture, or any other relationship such as master-servant, or principal-agent.
11. INDEMNITY AND HOLD HARMLESS
Supplier must indemnify, defend, save, and hold Sourcewell and its Participating Entities, including their agents and employees, harmless from any claims or causes of action, including attorneys’ fees incurred by Sourcewell or its Participating Entities, arising out of any act or omission in the performance of this Contract by the Supplier or its agents or employees; this indemnification includes injury or death to person(s) or property alleged to have been caused by some defect in the Equipment, Products, or Services under this Contract to the extent the Equipment, Product, or Service has been used according to its specifications. Sourcewell’s responsibility will be governed by the State of Minnesota’s Tort Liability Act (Minnesota Statutes Chapter 466) and other applicable law.
12. GOVERNMENT DATA PRACTICES
Supplier and Sourcewell must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to all data provided by or provided to Sourcewell under this Contract and as it applies to all data created, collected, received, stored, used, maintained, or disseminated by the Supplier under this Contract.
13. INTELLECTUAL PROPERTY, PUBLICITY, MARKETING, AND ENDORSEMENT A. INTELLECTUAL PROPERTY
1. Grant of License. During the term of this Contract:
a. Sourcewell grants to Supplier a royalty-free, worldwide, non-exclusive right and license to use thetrademark(s) provided to Supplier by Sourcewell in advertising and promotional materials for the purpose of marketing Sourcewell’s relationship with Supplier.
b. Supplier grants to Sourcewell a royalty-free, worldwide, non-exclusive right and license to use Supplier’s trademarks in advertising and promotional materials for the purpose of marketing Supplier’s relationship with Sourcewell.
2. Limited Right of Sublicense. The right and license granted herein includes a limited right of each party to grant sublicenses to their respective subsidiaries, distributors, dealers,
091521-NAF
Rev. 3/2021 9
resellers, marketing representatives, and agents (collectively “Permitted Sublicensees”) in advertising and promotional materials for the purpose of marketing the Parties’ relationship to Participating Entities. Any sublicense granted will be subject to the terms and conditions of this Article. Each party will be responsible for any breach of this Article by any of their respective sublicensees.
3. Use; Quality Control.
a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.
b. Each party agrees to use, and to cause its Permitted Sublicensees to use, the other party’s trademarks only in good faith and in a dignified manner consistent with such party’s use of the trademarks. Upon written notice to the breaching party, the breaching party has 30 days of the date of the written notice to cure the breach or the license will be terminated.
4. As applicable, Supplier agrees to indemnify and hold harmless Sourcewell and its Participating Entities against any and all suits, claims, judgments, and costs instituted or recovered against Sourcewell or Participating Entities by any person on account of the use of any Equipment or Products by Sourcewell or its Participating Entities supplied by Supplier in violation of applicable patent or copyright laws.
5. Termination. Upon the termination of this Contract for any reason, each party, including Permitted Sublicensees, will have 30 days to remove all Trademarks from signage, websites, and the like bearing the other party’s name or logo (excepting Sourcewell’s pre-printed catalog of suppliers which may be used until the next printing). Supplier must return all marketing and promotional materials, including signage, provided by Sourcewell, or dispose of it according to Sourcewell’s written directions.
B. PUBLICITY. Any publicity regarding the subject matter of this Contract must not be released without prior written approval from the Authorized Representatives. Publicity includes notices, informational pamphlets, press releases, research, reports, signs, and similar public notices prepared by or for the Supplier individually or jointly with others, or any subcontractors, with respect to the program, publications, or services provided resulting from this Contract.
C. MARKETING. Any direct advertising, marketing, or offers with Participating Entities must be approved by Sourcewell. Send all approval requests to the Sourcewell Supplier Development Administrator assigned to this Contract.
D. ENDORSEMENT. The Supplier must not claim that Sourcewell endorses its Equipment, Products, or Services.
091521-NAF
Rev. 3/2021 10
14. GOVERNING LAW, JURISDICTION, AND VENUE
The substantive and procedural laws of the State of Minnesota will govern this Contract. Venue for all legal proceedings arising out of this Contract, or its breach, must be in the appropriate state court in Todd County, Minnesota or federal court in Fergus Falls, Minnesota.
15. FORCE MAJEURE
Neither party to this Contract will be held responsible for delay or default caused by acts of God or other conditions that are beyond that party’s reasonable control. A party defaulting under this provision must provide the other party prompt written notice of the default.
16. SEVERABILITY
If any provision of this Contract is found by a court of competent jurisdiction to be illegal, unenforceable, or void then both parties will be relieved from all obligations arising from that provision. If the remainder of this Contract is capable of being performed, it will not be affected by such determination or finding and must be fully performed.
17. PERFORMANCE, DEFAULT, AND REMEDIES
A. PERFORMANCE. During the term of this Contract, the parties will monitor performance and address unresolved contract issues as follows:
1. Notification. The parties must promptly notify each other of any known dispute and work in good faith to resolve such dispute within a reasonable period of time. If necessary, Sourcewell and the Supplier will jointly develop a short briefing document that describes the issue(s), relevant impact, and positions of both parties.
2. Escalation. If parties are unable to resolve the issue in a timely manner, as specified above, either Sourcewell or Supplier may escalate the resolution of the issue to a higher level of management. The Supplier will have 30 calendar days to cure an outstanding issue.
3. Performance while Dispute is Pending. Notwithstanding the existence of a dispute, the Supplier must continue without delay to carry out all of its responsibilities under the Contract that are not affected by the dispute. If the Supplier fails to continue without delay to perform its responsibilities under the Contract, in the accomplishment of all undisputed work, the Supplier will bear any additional costs incurred by Sourcewell and/or its Participating Entities as a result of such failure to proceed.
B. DEFAULT AND REMEDIES. Either of the following constitutes cause to declare this Contract, or any Participating Entity order under this Contract, in default:
1. Nonperformance of contractual requirements, or
2. A material breach of any term or condition of this Contract.
091521-NAF
Rev. 3/2021 11
The party claiming default must provide written notice of the default, with 30 calendar days to cure the default. Time allowed for cure will not diminish or eliminate any liability for liquidated or other damages. If the default remains after the opportunity for cure, the non-defaulting party may:
x Exercise any remedy provided by law or equity, or
x Terminate the Contract or any portion thereof, including any orders issued against the Contract.
18. INSURANCE
A. REQUIREMENTS. At its own expense, Supplier must maintain insurance policy(ies) in effect at all times during the performance of this Contract with insurance company(ies) licensed or authorized to do business in the State of Minnesota having an “AM BEST” rating of A- or better, with coverage and limits of insurance not less than the following:
1. Workers’ Compensation and Employer’s Liability.
Workers’ Compensation: As required by any applicable law or regulation.
Employer's Liability Insurance: must be provided in amounts not less than listed below:
Minimum limits:
$500,000 each accident for bodily injury by accident
$500,000 policy limit for bodily injury by disease
$500,000 each employee for bodily injury by disease
2. Commercial General Liability Insurance. Supplier will maintain insurance covering its operations, with coverage on an occurrence basis, and must be subject to terms no less broad than the Insurance Services Office (“ISO”) Commercial General Liability Form CG0001 (2001 or newer edition), or equivalent. At a minimum, coverage must include liability arising from premises, operations, bodily injury and property damage, independent contractors, products-completed operations including construction defect, contractual liability, blanket contractual liability, and personal injury and advertising injury. All required limits, terms and conditions of coverage must be maintained during the term of this Contract.
Minimum Limits:
$1,000,000 each occurrence Bodily Injury and Property Damage $1,000,000 Personal and Advertising Injury
$2,000,000 aggregate for Products-Completed operations
$2,000,000 general aggregate
3. Commercial Automobile Liability Insurance. During the term of this Contract, Supplier will maintain insurance covering all owned, hired, and non-owned automobiles in limits of liability not less than indicated below. The coverage must be subject to terms
091521-NAF
Rev. 3/2021 12
no less broad than ISO Business Auto Coverage Form CA 0001 (2010 edition or newer), or equivalent.
Minimum Limits:
$1,000,000 each accident, combined single limit
4. Umbrella Insurance. During the term of this Contract, Supplier will maintain umbrella coverage over Employer’s Liability, Commercial General Liability, and Commercial Automobile.
Minimum Limits:
$2,000,000
5. Network Security and Privacy Liability Insurance. During the term of this Contract, Supplier will maintain coverage for network security and privacy liability. The coverage may be endorsed on another form of liability coverage or written on a standalone policy. The insurance must cover claims which may arise from failure of Supplier’s security resulting in, but not limited to, computer attacks, unauthorized access, disclosure of not public data – including but not limited to, confidential or private information, transmission of a computer virus, or denial of service.
Minimum limits:
$2,000,000 per occurrence
$2,000,000 annual aggregate
Failure of Supplier to maintain the required insurance will constitute a material breach entitling Sourcewell to immediately terminate this Contract for default.
B. CERTIFICATES OF INSURANCE. Prior to commencing under this Contract, Supplier must furnish to Sourcewell a certificate of insurance, as evidence of the insurance required under this Contract. Prior to expiration of the policy(ies), renewal certificates must be mailed to Sourcewell, 202 12th Street Northeast, P.O. Box 219, Staples, MN 56479 or sent to the Sourcewell Supplier Development Administrator assigned to this Contract. The certificates must be signed by a person authorized by the insurer(s) to bind coverage on their behalf.
Failure to request certificates of insurance by Sourcewell, or failure of Supplier to provide certificates of insurance, in no way limits or relieves Supplier of its duties and responsibilities in this Contract.
C. ADDITIONAL INSURED ENDORSEMENT AND PRIMARY AND NON-CONTRIBUTORY INSURANCE CLAUSE. Supplier agrees to list Sourcewell and its Participating Entities, including their officers, agents, and employees, as an additional insured under the Supplier’s commercial general liability insurance policy with respect to liability arising out of activities, “operations,” or “work” performed by or on behalf of Supplier, and products and completed operations of Supplier. The policy provision(s) or endorsement(s) must further provide that coverage is
091521-NAF
Rev. 3/2021 13
primary and not excess over or contributory with any other valid, applicable, and collectible insurance or self-insurance in force for the additional insureds.
D. WAIVER OF SUBROGATION. Supplier waives and must require (by endorsement or otherwise) all its insurers to waive subrogation rights against Sourcewell and other additional insureds for losses paid under the insurance policies required by this Contract or other insurance applicable to the Supplier or its subcontractors. The waiver must apply to all deductibles and/or self-insured retentions applicable to the required or any other insurance maintained by the Supplier or its subcontractors. Where permitted by law, Supplier must require similar written express waivers of subrogation and insurance clauses from each of its subcontractors.
E. UMBRELLA/EXCESS LIABILITY/SELF-INSURED RETENTION. The limits required by this Contract can be met by either providing a primary policy or in combination with umbrella/excess liability policy(ies), or self-insured retention.
19. COMPLIANCE
A. LAWS AND REGULATIONS. All Equipment, Products, or Services provided under this Contract must comply fully with applicable federal laws and regulations, and with the laws in the states and provinces in which the Equipment, Products, or Services are sold.
B. LICENSES. Supplier must maintain a valid and current status on all required federal, state/provincial, and local licenses, bonds, and permits required for the operation of the business that the Supplier conducts with Sourcewell and Participating Entities.
20. BANKRUPTCY, DEBARMENT, OR SUSPENSION CERTIFICATION
Supplier certifies and warrants that it is not in bankruptcy or that it has previously disclosed in writing certain information to Sourcewell related to bankruptcy actions. If at any time during this Contract Supplier declares bankruptcy, Supplier must immediately notify Sourcewell in writing.
Supplier certifies and warrants that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from programs operated by the State of Minnesota; the United States federal government or the Canadian government, as applicable; or any Participating Entity. Supplier certifies and warrants that neither it nor its principals have been convicted of a criminal offense related to the subject matter of this Contract. Supplier further warrants that it will provide immediate written notice to Sourcewell if this certification changes at any time.
091521-NAF
Rev. 3/2021 14
21. PROVISIONS FOR NON-UNITED STATES FEDERAL ENTITY PROCUREMENTS UNDER
UNITED STATES FEDERAL AWARDS OR OTHER AWARDS
Participating Entities that use United States federal grant or FEMA funds to purchase goods or services from this Contract may be subject to additional requirements including the procurement standards of the Uniform Administrative Requirements, Cost Principles and Audit Requirements for Federal Awards, 2 C.F.R. § 200. Participating Entities may have additional requirements based on specific funding source terms or conditions. Within this Article, all references to “federal” should be interpreted to mean the United States federal government.
The following list only applies when a Participating Entity accesses Supplier’s Equipment, Products, or Services with United States federal funds.
A. EQUAL EMPLOYMENT OPPORTUNITY. Except as otherwise provided under 41 C.F.R. § 60, all contracts that meet the definition of “federally assisted construction contract” in 41 C.F.R. § 60-
1.3 must include the equal opportunity clause provided under 41 C.F.R. §60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 C.F.R. §, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 C.F.R. § 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.” The equal opportunity clause is incorporated herein by reference.
B. DAVIS-BACON ACT, AS AMENDED (40 U.S.C. § 3141-3148). When required by federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonfederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. § 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 C.F.R. § 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-federal entity must report all suspected or reported violations to the federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. § 3145), as supplemented by Department of Labor regulations (29 C.F.R. § 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-federal entity must report all suspected or reported violations to the federal awarding agency. Supplier must be in compliance with all applicable Davis-Bacon Act provisions.
091521-NAF
Rev. 3/2021 15
C. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT (40 U.S.C. § 3701-3708). Where applicable, all contracts awarded by the non-federal entity in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. §§ 3702 and 3704, as supplemented by Department of Labor regulations (29 C.F.R. § 5).
Under 40 U.S.C. § 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. § 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence. This provision is hereby incorporated by reference into this Contract. Supplier certifies that during the term of an award for all contracts by Sourcewell resulting from this procurement process, Supplier must comply with applicable requirements as referenced above.
D. RIGHTS TO INVENTIONS MADE UNDER A CONTRACT OR AGREEMENT. If the federal award meets the definition of “funding agreement” under 37 C.F.R. § 401.2(a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with the requirements of 37 C.F.R. § 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency. Supplier certifies that during the term of an award for all contracts by Sourcewell resulting from this procurement process, Supplier must comply with applicable requirements as referenced above.
E. CLEAN AIR ACT (42 U.S.C. § 7401-7671Q.) AND THE FEDERAL WATER POLLUTION CONTROL ACT (33 U.S.C. § 1251-1387). Contracts and subgrants of amounts in excess of $150,000 require the non-federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. § 7401- 7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. § 1251- 1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA).
Supplier certifies that during the term of this Contract will comply with applicable requirements as referenced above.
F. DEBARMENT AND SUSPENSION (EXECUTIVE ORDERS 12549 AND 12689). A contract award (see 2 C.F.R. § 180.220) must not be made to parties listed on the government wide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 C.F.R. §180 that implement Executive Orders 12549 (3 C.F.R. § 1986 Comp., p. 189) and 12689 (3 C.F.R. § 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names
091521-NAF
Rev. 3/2021 16
of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. Supplier certifies that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency.
G. BYRD ANTI-LOBBYING AMENDMENT, AS AMENDED (31 U.S.C. § 1352). Suppliers must file any required certifications. Suppliers must not have used federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Suppliers must disclose any lobbying with non-federal funds that takes place in connection with obtaining any federal award. Such disclosures are forwarded from tier to tier up to the non-federal award. Suppliers must file all certifications and disclosures required by, and otherwise comply with, the Byrd Anti-Lobbying Amendment (31 U.S.C. § 1352).
H. RECORD RETENTION REQUIREMENTS. To the extent applicable, Supplier must comply with the record retention requirements detailed in 2 C.F.R. § 200.333. The Supplier further certifies that it will retain all records as required by 2 C.F.R. § 200.333 for a period of 3 years after grantees or subgrantees submit final expenditure reports or quarterly or annual financial reports, as applicable, and all other pending matters are closed.
I. ENERGY POLICY AND CONSERVATION ACT COMPLIANCE. To the extent applicable, Supplier must comply with the mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act.
J. BUY AMERICAN PROVISIONS COMPLIANCE. To the extent applicable, Supplier must comply with all applicable provisions of the Buy American Act. Purchases made in accordance with the Buy American Act must follow the applicable procurement rules calling for free and open competition.
K. ACCESS TO RECORDS (2 C.F.R. § 200.336). Supplier agrees that duly authorized representatives of a federal agency must have access to any books, documents, papers and records of Supplier that are directly pertinent to Supplier’s discharge of its obligations under this Contract for the purpose of making audits, examinations, excerpts, and transcriptions. The right also includes timely and reasonable access to Supplier’s personnel for the purpose of interview and discussion relating to such documents.
L. PROCUREMENT OF RECOVERED MATERIALS (2 C.F.R. § 200.322). A non-federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation
091521-NAF
Rev. 3/2021 17
and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 C.F.R. § 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.
M. FEDERAL SEAL(S), LOGOS, AND FLAGS. The Supplier not use the seal(s), logos, crests, or reproductions of flags or likenesses of Federal agency officials without specific pre-approval.
N. NO OBLIGATION BY FEDERAL GOVERNMENT. The U.S. federal government is not a party to this Contract or any purchase by an Participating Entity and is not subject to any obligations or liabilities to the Participating Entity, Supplier, or any other party pertaining to any matter resulting from the Contract or any purchase by an authorized user.
O. PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS OR RELATED ACTS. The Contractor acknowledges that 31 U.S.C. 38 (Administrative Remedies for False Claims and Statements) applies to the Supplier’s actions pertaining to this Contract or any purchase by a Participating Entity.
P. FEDERAL DEBT. The Supplier certifies that it is non-delinquent in its repayment of any federal debt. Examples of relevant debt include delinquent payroll and other taxes, audit disallowance, and benefit overpayments.
Q. CONFLICTS OF INTEREST. The Supplier must notify the U.S. Office of General Services, Sourcewell, and Participating Entity as soon as possible if this Contract or any aspect related to the anticipated work under this Contract raises an actual or potential conflict of interest (as described in 2 C.F.R. Part 200). The Supplier must explain the actual or potential conflict in writing in sufficient detail so that the U.S. Office of General Services, Sourcewell, and Participating Entity are able to assess the actual or potential conflict; and provide any additional information as necessary or requested.
R. U.S. EXECUTIVE ORDER 13224. The Supplier, and its subcontractors, must comply with U.S. Executive Order 13224 and U.S. Laws that prohibit transactions with and provision of resources and support to individuals and organizations associated with terrorism.
S. PROHIBITION ON CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT. To the extent applicable, Supplier certifies that during the term of this Contract it will comply with applicable requirements of 2 C.F.R. § 200.216.
T. DOMESTIC PREFERENCES FOR PROCUREMENTS. To the extent applicable, Supplier certifies that during the term of this Contract will comply with applicable requirements of 2 C.F.R. § 200.322.
091521-NAF
Rev. 3/2021 18
22. CANCELLATION
Sourcewell or Supplier may cancel this Contract at any time, with or without cause, upon 60 days’ written notice to the other party. However, Sourcewell may cancel this Contract immediately upon discovery of a material defect in any certification made in Supplier’s Proposal. Cancellation of this Contract does not relieve either party of financial, product, or service obligations incurred or accrued prior to cancellation.
Sourcewell 72 Hour LLC dba: National Auto
Fleet Group
By: __________________________ By: __________________________ Jeremy Schwartz Jesse Cooper
Title: Chief Procurement Officer Title: Fleet Manager
Date: ________________________ Date: ________________________ Approved:
By: __________________________
Chad Coauette
Title: Executive Director/CEO
Date: ________________________
5)3
$XWRPRELOHV689V9DQVDQG/LJKW7UXFNVZLWK
5HODWHG(TXLSPHQWDQG$FFHVVRULHV
9HQGRU'HWDLOV
&RPSDQ\1DPH
+285//&
'RHV\RXUFRPSDQ\FRQGXFW
EXVLQHVVXQGHUDQ\RWKHUQDPH",I
\HVSOHDVHVWDWH
1DWLRQDO$XWR)OHHW*URXS
$GGUHVV
$XWR&HQWHU'ULYH
:DWVRQYLOOH&$
&RQWDFW
-HVVH&RRSHU
(PDLO
-FRRSHU#QDWLRQDODXWRIOHHWJURXSFRP
3KRQH
)D[
+67
6XEPLVVLRQ'HWDLOV
&UHDWHG2Q
7XHVGD\$XJXVW
6XEPLWWHG2Q
7XHVGD\6HSWHPEHU
6XEPLWWHG%\
-HVVH&RRSHU
(PDLO
-FRRSHU#QDWLRQDODXWRIOHHWJURXSFRP
7UDQVDFWLRQ
GH
GHHI
EEHIGEG
6XEPLWWHU
V,3$GGUHVV
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
6SHFLILFDWLRQV
7DEOH
3URSRVHU,GHQWLW\ $XWKRUL]HG5HSUHVHQWDWLYHV
*HQHUDO,QVWUXFWLRQV
DSSOLHVWRDOO7DEOHV
6RXUFHZHOOSUHIHUVDEULHIEXWWKRURXJKUHVSRQVHWRHDFKTXHVWLRQ'RQRWPHUHO\DWWDFKDGGLWLRQDOGRFXPHQWVWR\RXU UHVSRQVHZLWKRXWDOVRSURYLGLQJDVXEVWDQWLYHUHVSRQVH'RQRWOHDYHDQVZHUVEODQN UHVSRQG³1$´LIWKHTXHVWLRQGRHVQRWDSSO\WR\RX
SUHIHUDEO\ZLWKDQ
H[SODQDWLRQ
/LQH
,WHP 4XHVWLRQ 5HVSRQVH
3URSRVHUௐ/HJDOௐ1DPHௐ
RQHௐOHJDOௐHQWLW\ௐRQO\
ௐௐ
,QௐWKHௐ
HYHQWௐRIௐDZDUGௐZLOOௐH[HFXWHௐWKHௐUHVXOWLQJௐFRQWUDFWௐ
DVௐ6XSSOLHU
ௐ+RXUௐ//&
,GHQWLI\ௐDOOௐVXEVLGLDU\ௐHQWLWLHVௐRIௐWKHௐ3URSRVHUௐZKRVHௐ HTXLSPHQWௐSURGXFWVௐRUௐVHUYLFHVௐDUHௐLQFOXGHGௐLQௐWKHௐ
3URSRVDO
:&$)ௐ//&
:&'-5ௐ//&
$ODQௐ-D\ௐ$XWRPRWLYHௐ,QF
,GHQWLI\ௐDOOௐDSSOLFDEOHௐDVVXPHGௐQDPHVௐRUௐ'%$ௐQDPHVௐRIௐ WKHௐ3URSRVHUௐRUௐ3URSRVHU
VௐVXEVLGLDULHVௐLQௐ/LQHௐௐRUௐ
/LQHௐௐDERYH
1$)*ௐKDVௐQXPHURXVௐVXEVLGLDULHVௐDQGௐ'%$
VௐLQFOXGLQJௐEXWௐQRWௐOLPLWHGௐWR
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐ
&KHYUROHWௐRIௐ:DWVRQYLOOH
:DWVRQYLOOHௐ)RUG
:DWVRQYLOOHௐ&'-5
:DWVRQYLOOHௐ)OHHWௐ*URXS
$ODQௐ-D\ௐ&KU\VOHUௐ-HHSௐ,QF
$ODQௐ-D\ௐ&KHYUROHWௐ&DGLOODF
$ODQௐ-D\ௐ%XLFNௐ*0&
$ODQௐ-D\ௐ$XWRௐ2XWOHW
&OHZLVWRQௐ0RWRUௐ&RPSDQ\ௐ,QF
$ODQௐ-D\ௐ&KU\VOHUௐ'RGJHௐ5DPௐ-HHS
$ODQௐ-D\ௐ/LQFROQ
$ODQௐ-D\ௐ)RUG
$ODQௐ-D\ௐ1LVVDQ
$ODQௐ-D\ௐ7R\RWD
3URSRVHUௐ3K\VLFDOௐ$GGUHVV
ௐ$XWRௐ&HQWHUௐ'ULYH
:DWVRQYLOOHௐ&$ௐ
3URSRVHUௐZHEVLWHௐDGGUHVVௐ
RUௐDGGUHVVHV
ZZZ1DWLRQDO$XWR)OHHW*URXSFRP
3URSRVHU
Vௐ$XWKRUL]HGௐ5HSUHVHQWDWLYHௐ
QDPHௐWLWOHௐ
DGGUHVVௐHPDLOௐDGGUHVVௐ ௐSKRQH
ௐ
7KHௐUHSUHVHQWDWLYHௐ
PXVWௐKDYHௐDXWKRULW\ௐWRௐVLJQௐWKHௐ³3URSRVHU¶Vௐ$VVXUDQFHௐ
RIௐ&RPSOLDQFH´ௐRQௐEHKDOIௐRIௐWKHௐ3URSRVHUௐDQGௐLQௐWKHௐ
HYHQWௐRIௐDZDUGௐZLOOௐEHௐH[SHFWHGௐWRௐH[HFXWHௐWKHௐUHVXOWLQJௐ
FRQWUDFW
-HVVHௐ&RRSHU
)OHHWௐ0DQDJHU
ௐ$XWRௐ&HQWHUௐ'ULYH
:DWVRQYLOOHௐ&$ௐ
-FRRSHU#QDWLRQDODXWRIOHHWJURXSFRP
3URSRVHU
VௐSULPDU\ௐFRQWDFWௐIRUௐWKLVௐSURSRVDOௐ
QDPHௐWLWOHௐ
DGGUHVVௐHPDLOௐDGGUHVVௐ ௐSKRQH
-HVVHௐ&RRSHU
)OHHWௐ0DQDJHU
ௐ$XWRௐ&HQWHUௐ'ULYH
:DWVRQYLOOHௐ&$ௐ
-FRRSHU#QDWLRQDODXWRIOHHWJURXSFRP
3URSRVHU
VௐRWKHUௐFRQWDFWVௐIRUௐWKLVௐSURSRVDOௐLIௐDQ\ௐ
QDPHௐWLWOHௐDGGUHVVௐHPDLOௐDGGUHVVௐ ௐSKRQH
&ODUNHௐ&RRSHU
)OHHWௐ0DQJHU
ௐ$XWRௐ&HQWHUௐ'ULYH
:DWVRQYLOOHௐ&$ௐ
&ODUNH&RRSHU#ZDWVRQYLOOHIOHHWJURXSFRP
7DEOH
&RPSDQ\,QIRUPDWLRQDQG)LQDQFLDO6WUHQJWK
/LQH
,WHP 4XHVWLRQ 5HVSRQVH
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
3URYLGHௐDௐEULHIௐKLVWRU\ௐRIௐ\RXUௐFRPSDQ\ௐLQFOXGLQJௐ\RXUௐ FRPSDQ\¶VௐFRUHௐYDOXHVௐEXVLQHVVௐSKLORVRSK\ௐDQGௐ
LQGXVWU\ௐORQJHYLW\ௐUHODWHGௐWRௐWKHௐUHTXHVWHGௐHTXLSPHQWௐ SURGXFWVௐRUௐVHUYLFHV
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐVWDUWHGௐDVௐDௐQHZௐGLYLVLRQௐRIௐௐ+RXUௐ//&ௐLQௐWKHௐVXPPHUௐRIௐௐLQௐWKHௐ KHDUWௐRIௐ6RXWKHUQௐ&DOLIRUQLDௐ:HௐEHJDQௐRXUௐQHWZRUNௐZLWKௐDௐVLQJOHௐDXWRPRELOHௐGHDOHUVKLSௐDQGௐKDYHௐQRZௐ JURZQௐRXUௐQHWZRUNௐWRௐHQFRPSDVVௐQXPHURXVௐGHDOHUVKLSVௐORFDWHGௐLQௐDQGௐRXWVLGHௐRIௐ&DOLIRUQLDௐ :HௐVWDQGௐE\ௐSURYLGLQJௐRSSRUWXQLWLHVௐIRUௐDGYDQFHPHQWௐE\ௐKLULQJௐDQGௐSURPRWLQJௐIURPௐZLWKLQௐRXUௐ RUJDQL]DWLRQௐ0DQ\ௐRIௐWKHௐ)OHHWௐ0DQDJHUVௐZKRௐVWDUWHGௐZLWKௐXVௐLQௐௐDUHௐVWLOOௐZLWKௐXVௐWRGD\ௐ 7KURXJKௐWKHௐ\HDUVௐZHௐKDYHௐHYROYHGௐDQGௐDGDSWHGௐWRௐWKHௐQHZௐWHFKQRORJ\ௐGULYHQௐWUHQGVௐWKDWௐDUHௐ UHYROXWLRQL]LQJௐWKHௐDXWRPRWLYHௐLQGXVWU\ௐWRGD\ௐ+RZHYHUௐRXUௐEUDQG¶VௐIXQGDPHQWDOௐFRUHௐYDOXHVௐKDYHௐ UHPDLQHGௐXQFKDQJHGௐ±ௐ:HௐDUHௐFRPPLWWHGௐWRௐGRௐULJKWௐIRUௐWKHௐPHPEHUVௐ,IௐZHௐWDNHௐFDUHௐRIௐWKHPௐWKH\ௐ ZLOOௐLQௐUHWXUQௐWDNHௐFDUHௐRIௐXVௐ
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXS¶VௐRSHUDWLRQDOௐEOXHSULQWௐDQGௐEXVLQHVVௐSKLORVRSK\ௐKDVௐDOZD\VௐEHHQௐWKHௐ³ௐ 5,*+7¶V´ௐIRUௐHYHU\ௐPHPEHU
ௐ:HௐGHOLYHUௐWKHௐ5,*+7ௐYHKLFOHௐDWௐWKHௐ5,*+7ௐWLPHௐWRௐWKHௐ5,*+7ௐSODFHௐDWௐ WKHௐ5,*+7ௐSULFHௐ
7KHௐLQWHJULW\ௐRIௐRXUௐEXVLQHVVௐVWHPVௐRQௐRXUௐGHHSௐIDPLO\ௐURRWVௐLQௐWKHௐDXWRPRWLYHௐLQGXVWU\ௐ:HௐDUHௐDQGௐ DOZD\VௐZLOOௐEHௐIDPLO\ௐRZQHGௐDQGௐRSHUDWHGௐZLWKௐRXUௐIXWXUHௐJHQHUDWLRQVௐDOUHDG\ௐLQௐWKHLUௐLQIDQWௐVWDJHVௐ WRGD\ௐ:HௐDUHௐFRPPLWWHGௐWRௐSLRQHHULQJௐRXUௐLQGXVWU\ௐIRUௐGHFDGHVௐWRௐFRPH
:KDWௐDUHௐ\RXUௐFRPSDQ\¶VௐH[SHFWDWLRQVௐLQௐWKHௐHYHQWௐRIௐ DQௐDZDUG"
,IௐDZDUGHGௐWKLVௐZRXOGௐEHௐRXUௐWKௐ6RXUFHZHOOௐ&RQWUDFWௐDQGௐZHௐZRXOGௐH[HFXWHௐDVௐVXFKௐ:HௐZLOOௐ FRQWLQXHௐWRௐVHUYHௐ\RXUௐPHPEHUVௐDQGௐSURYLGHௐWKHPௐZLWKௐH[FHOOHQWௐFXVWRPHUௐVHUYLFHௐZKLOHௐFRQWLQXLQJௐWRௐ DGYDQFHௐFXVWRPHUௐVDWLVIDFWLRQௐ$ORQJௐZLWKௐLPSOHPHQWLQJௐQHZௐEXVLQHVVௐJURZWKௐVWUDWHJLHVௐWKDWௐZLOOௐ XOWLPDWHO\ௐODXQFKௐXVௐLQWRௐQHZௐKHLJKWVௐRQFHௐDJDLQௐ
)XUWKHUPRUHௐZHௐZLOOௐODXQFKௐRXUௐ3DUWQHUௐ3URJUDPௐGHWDLOHGௐLQௐWKHௐDWWDFKHGௐ³PDUNHWLQJௐ3ODQௐ &RPSUHVVHG´ௐ=LSௐILOHௐ7KLVௐQH[WௐJHQHUDWLRQௐDSSOLFDWLRQௐZLOOௐJLYHௐPHPEHUVௐWKHௐSRZHUௐWRௐVHOHFWௐXSILWWHUVௐ WKH\ௐZRXOGௐOLNHௐ1$)*ௐWRௐSDUWQHUௐZLWKௐLQௐSURYLGLQJௐVDWLVIDFWRU\ௐTXRWHVௐDQGௐVHUYLFHௐ:HௐVHHௐWUHPHQGRXVௐ YDOXHௐLQௐEXLOGLQJௐRXWௐWKHVHௐPXWXDOO\ௐEHQHILFLDOௐSDUWQHUVKLSVௐVRௐZHௐFDQௐSURYLGHௐௐVDWLVIDFWRU\ௐ WXUQNH\ௐVROXWLRQVௐWRௐWKHௐPHPEHUV
'HPRQVWUDWHௐ\RXUௐILQDQFLDOௐVWUHQJWKௐDQGௐVWDELOLW\ௐZLWKௐ PHDQLQJIXOௐGDWDௐ7KLVௐFRXOGௐLQFOXGHௐVXFKௐLWHPVௐDVௐ
ILQDQFLDOௐVWDWHPHQWVௐ6(&ௐILOLQJVௐFUHGLWௐDQGௐERQGௐ
UDWLQJVௐOHWWHUVௐRIௐFUHGLWௐDQGௐGHWDLOHGௐUHIHUHQFHௐOHWWHUVௐ 8SORDGௐVXSSRUWLQJௐGRFXPHQWVௐ
DVௐDSSOLFDEOH
ௐLQௐWKHௐ
GRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
7RௐGHPRQVWUDWHௐ1$)*¶VௐILQDQFLDOௐVWUHQJWKௐDQGௐVWDELOLW\ௐZHௐKDYHௐXSORDGHGௐ%DQNௐ&RPPLWPHQWௐOHWWHUVௐ XQGHUௐWKHௐ)LQDQFLDOௐ6WUHQJWKௐ6HFWLRQௐRIௐWKHௐRQOLQHௐDSSOLFDWLRQௐ:HௐKDYHௐDௐGLUHFWௐOLQHௐRIௐFUHGLWௐRIௐ ௐWKDWௐZHௐDUHௐFXUUHQWO\ௐXWLOL]LQJௐZLWKௐRXUௐFXUUHQWௐDQGௐSDVWௐ6RXUFHZHOOௐ&RQWUDFWVௐ+RZHYHUௐ WKLVௐQXPEHUௐLVௐQRWௐFDSSHGௐDVௐZHௐKDYHௐWKHௐIUHHGRPௐWRௐH[WHQGௐWKHௐFDSௐWRௐDFFRPPRGDWHௐWKHௐUHYROYLQJௐ QHHGVௐRIௐWKHௐPHPEHUVௐ
5HIHUHQFHGௐEHORZௐLVௐDௐVKRUWௐUHJLVWHUௐRIௐVRPHௐRIௐRXUௐPDUNHWௐVXFFHVVௐIURPௐDZDUGHGௐJRYHUQPHQWௐ FRQWUDFWVௐWKDWௐHQFRPSDVVௐRYHUௐௐZRUWKௐRIௐSURGXFWVௐDQGௐJRRGVௐXQGHUௐRXUௐFXUUHQWௐ 6RXUFHZHOOௐ&RQWUDFWௐ
$ௐ&LW\ௐRIௐ6DQௐ'LHJRௐ&$ௐௐௐFRQWUDFWௐXQGHUௐRXUௐ6RXUFHZHOOௐ&RQWUDFWௐ1$) %ௐௐ&LW\ௐRIௐ6DQௐ'LHJRௐ&$ௐௐௐFRQWUDFWௐXQGHUௐRXUௐ6RXUFHZHOOௐ&RQWUDFWௐ1$) &ௐ*RYHUQPHQWௐ)OHHWௐ$UWLFOHௐ+LJKOLJKWLQJௐRXUௐWUDQVDFWLRQௐZLWKௐWKHௐ&LW\ௐRIௐ6DQௐ'LHJRௐ&$ௐSURFXULQJௐRYHUௐ ௐ3ROLFHௐYHKLFOHVௐWKURXJKௐ1$)*ௐ6RXUFHZHOOௐ&RQWUDFWௐ1$) 'ௐ&LW\ௐRIௐ/RVௐ$QJHOHVௐ:RUOGௐ$LUSRUWVௐ&$ௐ&RQWUDFWௐIRUௐௐௐXQGHUௐ6RXUFHZHOOௐ&RQWUDFWௐ 1$)ௐIRUௐWKHௐSURFXUHPHQWௐRIௐௐYHKLFOHV
(ௐ&LW\ௐRIௐ/RVௐ$QJHOHVௐ+DUERUௐ&$ௐ&RQWUDFWௐ([WHQVLRQௐWRௐௐௐFRQWUDFWௐXQGHUௐ6RXUFHZHOOௐ &RQWUDFWௐ1$)
)ௐ&LW\ௐRIௐ/RVௐ$QJHOHVௐ+DUERUௐ&$ௐ&RQWUDFWௐIRUௐௐXQGHUௐRXUௐ6RXUFHZHOOௐ&RQWUDFWௐ1$) *ௐ&LW\ௐRIௐ/RVௐ$QJHOHVௐ+DUERUௐ&$ௐ5HQHZDOௐIRUௐDQRWKHUௐௐௐXQGHUௐ6RXUFHZHOOௐ&RQWUDFWௐ&ODVVௐ ௐௐDQGௐௐ&RQWUDFWௐ1$)
+ௐ&LW\ௐRIௐ&RVWDௐ0HVDௐ&$ௐ&RQWUDFWௐௐXQGHUௐRXUௐ6RXUFHZHOOௐ&RQWUDFWௐ1$) ,ௐ%ODQNHWௐ&RQWUDFWVௐZLWKௐWKHௐ6WDWHௐRIௐ0DU\ODQGௐ0'ௐRIIௐRXUௐFXUUHQWௐ&ODVVௐௐௐDQGௐௐ&KDVVLVௐ&RQWUDFWௐ 1$)
-ௐ%ODQNHWௐ&RQWUDFWVௐZLWKௐWKHௐ6WDWHௐRIௐ0DU\ODQGௐ0'ௐRIIௐRXUௐ&XUUHQWௐ6RXUFHZHOOௐ&RQWUDFWௐ1$) :HௐKDYHௐDOVRௐDWWDFKHGௐRXUௐ&RPPLWPHQWௐ/HWWHU¶VௐIRUௐXQSDUDOOHOௐVXSSRUWௐIURPௐOHDGLQJௐQDWLRQDOO\ௐ UHFRJQL]HGௐXSILWௐVXSSOLHUVௐVXFKௐ7KHௐ.QDSKHLGHௐ0DQXIDFWXULQJௐ&RPSDQ\ௐ$ORQJௐZLWKௐUHJLRQDOௐVXSSOLHUVௐ VXFKௐDVௐ%UDQGௐ);ௐDQGௐ3KHQL[ௐ7UXFNௐ%RG\ௐORFDWHGௐLQௐ6RXWKHUQௐ&DOLIRUQLDௐVHUYHௐDVௐUHJLRQDOௐVXSSRUWௐ ORFDWLRQVௐZKRPௐZHௐRIWHQௐZRUNௐDORQJVLGHௐWRௐIXOILOOௐDOOௐPHPEHUௐQHHGVௐZLWKௐSDVWௐSUHVHQWௐDQGௐIXWXUHௐ RUGHUVௐZLWKௐ1$)*ௐ
,QFOXGHGௐDUHௐDOVRௐ8SILWWHUௐ5HFRPPHQGDWLRQௐOHWWHUVௐWRௐLOOXVWUDWHௐKRZௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐKDVௐ WDNHQௐDௐSURDFWLYHௐLQWHUHVWௐLQௐEXLOGLQJௐPXWXDOO\ௐEHQHILFLDOௐUHODWLRQVKLSௐZLWKௐRXUௐXSILWWHUVௐ0XWXDOLW\ௐDQGௐ UHFLSURFLW\ௐUHODWLRQVKLSVௐEHWZHHQௐERG\ௐFRPSDQLHVௐDQGௐRXUௐGHDOHU¶VௐDUHௐWZRௐRIௐWKHௐNH\ௐFRPSRQHQWVௐ WKDWௐKHOSௐPHPEHUVௐUHFHLYHௐZKDWௐWKH\ௐQHHGௐLQௐDௐVPRRWKௐDQGௐHIILFLHQWௐIDVKLRQௐ ,QௐDGGLWLRQௐWKHௐDGRSWLRQௐRIௐRXUௐ&ODVVௐௐௐDQGௐௐ&RQWUDFWௐIURPௐ$QQHௐ$UXQGHOௐ&RXQW\ௐLQௐWKHௐVWDWHௐRIௐ 0DU\ODQGௐLVௐDVௐDQௐH[DPSOHௐRIௐKRZௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐDWWUDFWVௐDQGௐUHWDLQVௐQHZௐFOLHQWVௐE\ௐ GHPRQVWUDWLQJௐWRௐWKHPௐWKHUH¶VௐDௐEHWWHUௐDQGௐPRUHௐHIILFLHQWௐZD\ௐRIௐILQGLQJௐWXUQNH\ௐVROXWLRQV /DVWO\ௐZHௐKDYHௐDWWDFKHGௐVXSSRUWLQJௐGRFXPHQWVௐWKDWௐKHOSௐHPSKDVL]HௐDQGௐH[HPSOLI\ௐRXUௐJURZWKௐVLQFHௐ RXUௐILUVWௐDZDUGHGௐ6RXUFHZHOOௐ&RQWUDFWௐLQௐௐ:HௐVLQFHUHO\ௐKRSHௐLWௐKHOSVௐSRUWUD\ௐRXUௐFRPPLWPHQWௐWRௐ EXLOGLQJௐOLIHORQJௐUDSSRUWௐDQGௐWUXVWௐZLWKௐRXUௐSDUWQHUௐXSILWWHUVௐDQGௐPHPEHUV
:KDWௐLVௐ\RXUௐ86ௐPDUNHWௐVKDUHௐIRUௐWKHௐVROXWLRQVௐWKDWௐ \RXௐDUHௐSURSRVLQJ"
ௐ2IௐRXUௐUHVSHFWLYHௐEUDQGVௐDQGௐ2(0¶VௐZHௐUHSUHVHQWௐWKHௐ86ௐPDUNHWௐVKDUHௐLVௐHVWLPDWHGௐWRௐEHௐௐ±ௐ
:KDWௐLVௐ\RXUௐ&DQDGLDQௐPDUNHWௐVKDUHௐIRUௐWKHௐVROXWLRQVௐ WKDWௐ\RXௐDUHௐSURSRVLQJ"
,WௐLVௐGLIILFXOWௐWRௐHVWLPDWHௐWKHௐPDUNHWௐVKDUHௐIRUௐWKHௐEUDQGVௐDQGௐ2(0¶VௐZHௐUHSUHVHQWௐKRZHYHUௐZHௐ HVWLPDWHௐWKDWௐLWௐVKRXOGௐEHௐWKHௐVDPHௐௐௐௐRIௐWKHௐ86ௐVKDUH
+DVௐ\RXUௐEXVLQHVVௐHYHUௐSHWLWLRQHGௐIRUௐEDQNUXSWF\ௐ
SURWHFWLRQ"ௐ,IௐVRௐH[SODLQௐLQௐGHWDLO
1R
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
+RZௐLVௐ\RXUௐRUJDQL]DWLRQௐEHVWௐGHVFULEHG
ௐLVௐLWௐDௐ
PDQXIDFWXUHUௐDௐGLVWULEXWRUGHDOHUUHVHOOHUௐRUௐDௐVHUYLFHௐ SURYLGHU"ௐௐ$QVZHUௐZKLFKHYHUௐTXHVWLRQௐ
HLWKHUௐD
ௐRUௐE
ௐ
MXVWௐEHORZ
ௐEHVWௐDSSOLHVௐWRௐ\RXUௐRUJDQL]DWLRQ
D
ௐௐௐௐ,Iௐ\RXUௐFRPSDQ\ௐLVௐEHVWௐGHVFULEHGௐDVௐDௐ
GLVWULEXWRUGHDOHUUHVHOOHUௐ
RUௐVLPLODUௐHQWLW\
ௐSURYLGHௐ\RXUௐ
ZULWWHQௐDXWKRUL]DWLRQௐWRௐDFWௐDVௐDௐ
GLVWULEXWRUGHDOHUUHVHOOHUௐIRUௐWKHௐPDQXIDFWXUHUௐRIௐWKHௐ SURGXFWVௐSURSRVHGௐLQௐWKLVௐ5)3ௐ,IௐDSSOLFDEOHௐLVௐ\RXUௐ
GHDOHUௐQHWZRUNௐLQGHSHQGHQWௐRUௐFRPSDQ\ௐRZQHG"
E
ௐௐௐௐ,Iௐ\RXUௐFRPSDQ\ௐLVௐEHVWௐGHVFULEHGௐDVௐDௐ
PDQXIDFWXUHUௐRUௐVHUYLFHௐSURYLGHUௐGHVFULEHௐ\RXUௐ
UHODWLRQVKLSௐZLWKௐ\RXUௐVDOHVௐDQGௐVHUYLFHௐIRUFHௐDQGௐZLWKௐ \RXUௐGHDOHUௐQHWZRUNௐLQௐGHOLYHULQJௐWKHௐSURGXFWVௐDQGௐ
VHUYLFHVௐSURSRVHGௐLQௐWKLVௐ5)3ௐ$UHௐWKHVHௐLQGLYLGXDOVௐ
\RXUௐHPSOR\HHVௐRUௐWKHௐHPSOR\HHVௐRIௐDௐWKLUGௐSDUW\"
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐLVௐDௐGHDOHUௐQHWZRUNௐEHVWௐFDWHJRUL]HGௐDVௐ³$´ௐௐ'LVWULEXWHU'HDOHU5HVHOOHUௐ DQGௐ'HDOHUௐ3DUWQHUௐIRUௐ
ௐ2(0ௐ0DQXIDFWXUHUVௐLQFOXGLQJௐ)RUGௐ0RWRUௐ&RPSDQ\ௐ&KHYUROHWௐ5$0ௐ *0&ௐ%XLFNௐ&KU\VOHUௐ'RGJHௐ-HHSௐ7R\RWDௐ1LVVDQௐ.,$ௐ%0:ௐ+RQGDௐ&DGLOODFௐDQGௐ9RONVZDJHQௐ$OOௐ RUGHUVௐDUHௐSODFHGௐZLWKௐWKHௐIUDQFKLVHGௐGHDOHUௐDQGௐXOWLPDWHO\ௐWLWOHGௐGLUHFWO\ௐWRௐWKHௐPHPEHUௐ$OOௐ DSSURSULDWHௐFHUWLILFDWLRQௐFHUWLILFDWHVௐDQGௐDXWKRUL]HGௐ'09)DFWRU\ௐOLFHQVHVௐPD\ௐEHௐIRXQGௐLQௐWKHௐ³5HODWHGௐ &HUWLILFDWLRQ´ௐVHFWLRQௐXSORDGHGௐWRௐWKLVௐ5)3ௐ,WௐVKRXOGௐEHௐQRWHGௐZHௐGRௐQRWௐVHOOௐXVHGௐHTXLSPHQWௐWRௐ PHPEHUV
,IௐDSSOLFDEOHௐSURYLGHௐDௐGHWDLOHGௐH[SODQDWLRQௐRXWOLQLQJௐ WKHௐOLFHQVHVௐDQGௐFHUWLILFDWLRQVௐWKDWௐDUHௐERWKௐUHTXLUHGௐWRௐ EHௐKHOGௐDQGௐDFWXDOO\ௐKHOGௐE\ௐ\RXUௐRUJDQL]DWLRQௐ
LQFOXGLQJௐWKLUGௐSDUWLHVௐDQGௐVXEFRQWUDFWRUVௐWKDWௐ\RXௐXVH ௐ
LQௐSXUVXLWௐRIௐWKHௐEXVLQHVVௐFRQWHPSODWHGௐE\ௐWKLVௐ5)3
5HTXLUHGௐOLFHQVHVௐLQFOXGHௐDௐ'HDOHU¶Vௐ/LFHQVHௐDௐ)UDQFKLVHௐLVVXHGௐE\ௐWKHௐ0DQXIDFWXUHௐDௐ'HSDUWPHQWௐ RIௐ0RWRUௐ9HKLFOHVௐ/LFHQVHௐDVௐZHOOௐDVௐDௐ5HVHOOHU¶VௐSHUPLWௐOLFHQVHௐ$OOௐZKLFKௐ1$)*ௐDQGௐ'HDOHUௐ 3DUWQHU¶VௐKROGௐ3OHDVHௐUHYLHZௐRXUௐDWWDFKPHQWௐGRFXPHQWVௐLQௐVHFWLRQௐ³5HODWHGௐ&HUWLILFDWLRQ´ௐIRUௐOLFHQVHVௐ WKDWௐZHௐHLWKHUௐVROHO\ௐRZQௐRUௐDUHௐMRLQWO\ௐRZQHGௐE\ௐRXUௐSDUWQHUௐGHDOHUVௐWKDWௐSHUWDLQௐWRௐWKLVௐ5)3ௐ$ௐOLVWௐRIௐ DOOௐRXUௐOLFHQVHVௐDUHௐEHORZௐVRPHௐRIௐZKLFKௐPD\ௐQRWௐSHUWDLQௐWRௐFODVVௐௐEXWௐWRௐFODVVௐௐ &$ௐ&HUWLILFDWHௐRIௐ*RRGௐ6WDQGLQJௐ
6WDWHௐRIௐ)ORULGDௐ/LFHQVHௐ&HUWLILFDWHV
ௐ
9)
9)
9)
9)
9)
9)
9)
9)
9)
9)
9)
&$ௐ6WDWHௐ6HOOHU¶Vௐ3HUPLWௐ
&$ௐ6WDWHௐ6HOOHU¶Vௐ3HUPLWௐ
'HSDUWPHQWௐRIௐ0RWRUௐ9HKLFOHௐ9HKLFOHௐ'HDOHUௐ/LFHQVHௐ1XPEHUௐ
'HSDUWPHQWௐRIௐ0RWRUௐ9HKLFOHௐ9HKLFOHௐ'HDOHUௐ/LFHQVHௐ1XPEHUௐ
'HSDUWPHQWௐRIௐ0RWRUௐ9HKLFOHௐ9HKLFOHௐ'HDOHUௐ/LFHQVHௐ1XPEHUௐ
%XUHDXௐRIௐ$XWRPRWLYHௐUHSDLUௐ5HJLVWUDWLRQௐௐ$5'
ௐ
&$ௐ6WDWHௐ6HOOHU¶Vௐ3HUPLWௐ
&LW\ௐRIௐ:DWVRQYLOOHௐ%XVLQHVVௐ/LFHQVHௐ1XPEHUௐ
&LW\ௐRIௐ:DWVRQYLOOHௐ%XVLQHVVௐ/LFHQVHௐ1XPEHUௐ
)LFWLWLRXVௐ%XVLQHVVௐ1DPHVௐIURPௐ6DQWDௐ&UX]ௐ&RXQW\ௐIRUௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐ)%1 ௐ
&DOLIRUQLDௐ*HQHUDOௐ5HVDOHௐ&HUWLILFDWHௐ
'XQௐ ௐ%UDGVWUHHWௐ1XPEHU
ௐ
*RYHUQPHQWௐRIௐ7KHௐ'LVWULFWௐRIௐ&ROXPELDௐ&HUWLILFDWH
*RYHUQPHQWௐRIௐWKHௐ'LVWULFWௐRIௐ&ROXPELDௐ7D[ௐ5HJLVWUDWLRQௐௐ &LW\ௐRIௐ/RVௐ$QJHOHVௐ7D[ௐ5HJLVWUDWLRQௐ
*RYHUQPHQWௐRIௐ7KHௐ'LVWULFWௐRIௐ&ROXPELDௐ&/($1ௐ+$1'6ௐ&(57,),&$7,21 6DQௐ'LHJRௐ)UHLJKWOLQHUௐ6HOOHU¶Vௐ3HUPLW
&RPPRQZHDOWKௐRIௐ9LUJLQLDௐ6WDWHௐ&RUSRUDWLRQௐ&RPPLVVLRQௐ&HUWLILFDWHௐ 6WDWHௐRIௐ0DU\ODQGௐ*RRGௐ6WDQGLQJௐ&HUWLILFDWHௐ
.DQVDVௐ'HSDUWPHQWௐRIௐ5HYHQXHௐIRUௐ.DQVDVௐ&LW\ௐ3HWHUELOW
1HZௐ-HUVH\ௐ'HSDUWPHQWௐRIௐ7UHDVXU\ௐ5HJLVWUDWLRQௐ&HUWLILFDWH 1HZௐ-HUVH\ௐ%XVLQHVVௐ5HJLVWUDWLRQௐ
1RWLFHௐRIௐ&RPSOLDQFHௐRIௐWKHௐ&DQWRQௐ&LW\ௐ&RGLILHGௐ2UGLQDQFHௐ (PSOR\HHௐ,QIRUPDWLRQௐ5HSRUWௐIRUௐWKHௐ6WDWHௐRIௐ1HZௐ-HUVH\ௐ 6WDWHௐRIௐ0DU\ODQGௐ1HZௐ6DOHVௐDQGௐ8VHௐWD[ௐ/LFHQVHௐ
&$ௐ6WDWHௐ6HOOHU¶Vௐ3HUPLWௐ
ௐ
6RXWKௐ&DUROLQDௐ'HSDUWPHQWௐRIௐ0RWRUௐ9HKLFOHVௐ/LFHQVHௐ1XPEHUௐ 6WDWHௐRIௐ6RXWKௐ&DUROLQDௐ5HWDLOௐ/LFHQVHௐ
&RPPRQZHDOWKௐRIௐ.HQWXFN\ௐ9HKLFOHௐ'HDOHUௐ/LFHQVHௐௐௐ 6WDWHௐRIௐ:HVWௐ9LUJLQLDௐ'HDOHUௐ/LFHQVHௐ
&RPPRQZHDOWKௐRIௐ.HQWXFN\ௐ9HKLFOHௐ'HDOHUௐ/LFHQVHௐௐௐ 6WDWHௐRIௐ7HQQHVVHHௐ9HKLFOHௐ'HDOHUௐ/LFHQVH
3URYLGHௐDOOௐ³6XVSHQVLRQௐRUௐ'HEDUPHQW´ௐLQIRUPDWLRQௐWKDWௐ KDVௐDSSOLHGௐWRௐ\RXUௐRUJDQL]DWLRQௐGXULQJௐWKHௐSDVWௐWHQௐ
\HDUV
1RWௐ$SSOLFDEOHௐQRQH
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
7DEOH
,QGXVWU\5HFRJQLWLRQ 0DUNHWSODFH6XFFHVV
/LQH
,WHP 4XHVWLRQ 5HVSRQVH
'HVFULEHௐDQ\ௐUHOHYDQWௐLQGXVWU\ௐDZDUGVௐRUௐUHFRJQLWLRQௐ WKDWௐ\RXUௐFRPSDQ\ௐKDVௐUHFHLYHGௐLQௐWKHௐSDVWௐILYHௐ\HDUV
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXS¶VௐUHFHLYHGௐLWVௐPRVWௐSUHVWLJLRXVௐDZDUGௐIRUௐ7RSௐ3ODFHPHQWௐZLWKLQௐ)RUGௐ0RWRUௐ &RPSDQ\ௐDVௐWKHௐOHDGLQJௐGHDOHUVKLSௐLQௐ*RYHUQPHQWௐ6DOHVௐ,QௐDGGLWLRQௐRXUௐ&KHYUROHWௐEUDQGௐZDVௐKLJKO\ௐ UDQNHGௐDQGௐKRQRUHGௐௐFRQVHFXWLYHௐ\HDUVௐE\ௐ*HQHUDOௐ0RWRUV
:KDWௐSHUFHQWDJHௐRIௐ\RXUௐVDOHVௐDUHௐWRௐWKHௐ
JRYHUQPHQWDOௐVHFWRUௐLQௐWKHௐSDVWௐWKUHHௐ\HDUV
:LWKLQௐRXUௐIOHHWௐGLYLVLRQௐ
ௐRIௐRXUௐFRQWUDFWVௐZLWKLQௐWKHௐSDVWௐWKUHHௐ\HDUVௐKDYHௐEHHQௐZLWKௐJRYHUQPHQWௐ DFFRXQWV
:KDWௐSHUFHQWDJHௐRIௐ\RXUௐVDOHVௐDUHௐWRௐWKHௐHGXFDWLRQௐ
VHFWRUௐLQௐWKHௐSDVWௐWKUHHௐ\HDUV
:LWKLQௐWKHௐSDVWௐௐ\HDUVௐ
ௐRIௐRXUௐVDOHVௐKDYHௐEHHQௐWRௐJRYHUQPHQWௐDFFRXQWVௐௐRIௐZKLFKௐDUHௐ ZLWKLQௐWKHௐHGXFDWLRQௐVHFWRU
/LVWௐDQ\ௐVWDWHௐSURYLQFLDOௐRUௐFRRSHUDWLYHௐSXUFKDVLQJௐ FRQWUDFWVௐWKDWௐ\RXௐKROGௐ:KDWௐLVௐWKHௐDQQXDOௐVDOHVௐ
YROXPHௐIRUௐHDFKௐRIௐWKHVHௐFRQWUDFWVௐRYHUௐWKHௐSDVWௐWKUHHௐ \HDUV"
:HௐKROGௐWKHௐ6WDWHௐRIௐ&DOLIRUQLDௐFRQWUDFWௐZLWKௐYROXPHVௐIURPௐௐWRௐௐXQLWVௐDௐ\HDUௐRYHUௐWKHௐSDVWௐ WKUHHௐ\HDUVௐ,QௐDGGLWLRQௐRXUௐ6RXUFHZHOOௐ&RQWUDFW¶Vௐ
ௐௐDQGௐௐWKDWௐZHௐKDYHௐ
PDLQWDLQHGௐRYHUௐWKHௐSDVWௐWKUHHௐ\HDUVௐKDVௐVROGௐFRPELQHGௐQRUWKௐRIௐௐPLOOLRQௐRIௐ&RPELQHGௐ4XDUWHUO\ௐ 6DOHV
/LVWௐDQ\ௐ*6$ௐFRQWUDFWVௐRUௐ6WDQGLQJௐ2IIHUVௐDQGௐ6XSSO\ௐ $UUDQJHPHQWVௐ
626$
ௐWKDWௐ\RXௐKROGௐ:KDWௐLVௐWKHௐ
DQQXDOௐVDOHVௐYROXPHௐIRUௐHDFKௐRIௐWKHVHௐFRQWUDFWVௐRYHUௐ
WKHௐSDVWௐWKUHHௐ\HDUV"
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXS¶VௐIRFXVௐOLHVௐRQௐWKHௐ6RXUFHZHOOௐ&RQWUDFWௐ1$)*ௐKROGVௐQRௐRWKHUௐ*6$ௐ FRQWUDFWௐ6WDQGLQJௐ2IIHUVௐRUௐ6XSSO\ௐ$UUDQJHPHQWVௐRWKHUௐWKDQௐWKHௐ6WDWHௐRIௐ&DOLIRUQLDௐFRQWUDFWௐௐ2XUௐ DQQXDOௐVDOHVௐYROXPHௐLVௐHVWLPDWHGௐWRௐEHௐQRUWKௐRIௐௐPLOOLRQ
7DEOH
5HIHUHQFHV7HVWLPRQLDOV
/LQH,WHP6XSSO\UHIHUHQFHLQIRUPDWLRQIURPWKUHHFXVWRPHUVZKRDUHHOLJLEOHWREH6RXUFHZHOOSDUWLFLSDWLQJHQWLWLHV (QWLW\1DPH
&RQWDFW1DPH
3KRQH1XPEHU
3RUWௐRIௐ/RVௐ$QJHOHVௐ&$ 0Uௐ'DYHௐ&RPHU
&RXQW\ௐRIௐ9HQWXUHௐ&$ 0Uௐ-RUJHௐ%QLOOD
&LW\ௐRIௐ$XVWLQௐ7; 0Uௐ0DWWௐ6DJHU
&RXQW\ௐRIௐ6DQௐ-RDTXLQௐ&$ 0Uௐ'DYLGௐ0\HUV
&LW\ௐRIௐ3DORௐ$OWRௐ&$ 0Vௐ'DQLWUDௐ%DKOPDQ
7DEOH
7RS)LYH*RYHUQPHQWRU(GXFDWLRQ&XVWRPHUV
/LQH,WHP3URYLGHDOLVWRI\RXUWRSILYHJRYHUQPHQWHGXFDWLRQRUQRQSURILWFXVWRPHUV HQWLW\QDPHLVRSWLRQDO
LQFOXGLQJHQWLW\W\SHWKHVWDWHRUSURYLQFHWKH
HQWLW\LVORFDWHGLQVFRSHRIWKHSURMHFW
V
VL]HRIWUDQVDFWLRQ
V
DQGGROODUYROXPHVIURPWKHSDVWWKUHH\HDUV
(QWLW\1DPH (QWLW\7\SH
6WDWH3URYLQFH
6FRSHRI:RUN
6L]HRI7UDQVDFWLRQV
'ROODU9ROXPH3DVW7KUHH
<HDUV
&LW\ௐRIௐ$XVWLQ *RYHUQPHQW 7H[DV7; 3XUFKDVHU ௐ9HKLFOHVௐDWௐRQFHௐ9DQVௐ DQGௐ689V
2YHUௐ0
/RVௐ$QJHOHVௐ
'HSDUWPHQWௐRIௐ
:DWHUௐDQGௐ3RZHU
*RYHUQPHQW &DOLIRUQLD&$ 3XUFKDVHU 2YHUௐௐ9HKLFOHVௐ9DQVௐDQGௐ 689V
2YHUௐ0
3RUWௐRIௐ/RVௐ
$QJHOHV
*RYHUQPHQW &DOLIRUQLD&$ 3XUFKDVHU 2YHUௐௐ7UXFNVௐ9DQVௐDQGௐ689V 2YHUௐ0
$QQHௐ$UXQGHOௐ
&RXQW\
*RYHUQPHQW 0DU\ODQG0' 3XUFKDVHU 2YHUௐௐ7UXFNVௐ9DQVௐDQGௐ689V 2YHUௐ0
&LW\ௐRIௐ6DQௐ'LHJR *RYHUQPHQW &DOLIRUQLD&$ 3XUFKDVHU 2YHUௐௐ7UXFNVௐ9DQVௐ689 2YHUௐ0
7DEOH
$ELOLW\WR6HOODQG'HOLYHU6HUYLFH
'HVFULEH\RXUFRPSDQ\¶VFDSDELOLW\WRPHHWWKHQHHGVRI6RXUFHZHOOSDUWLFLSDWLQJHQWLWLHVDFURVVWKH86DQG&DQDGDDVDSSOLFDEOH<RXUUHVSRQVHVKRXOGDGGUHVV LQGHWDLODWOHDVWWKHIROORZLQJDUHDV
ORFDWLRQVRI\RXUQHWZRUNRIVDOHVDQGVHUYLFHSURYLGHUVWKHQXPEHURIZRUNHUV IXOOWLPHHTXLYDOHQWV
LQYROYHGLQHDFKVHFWRU
ZKHWKHUWKHVHZRUNHUVDUH\RXUGLUHFWHPSOR\HHV
RUHPSOR\HHVRIDWKLUGSDUW\
DQGDQ\RYHUODSEHWZHHQWKHVDOHVDQGVHUYLFHIXQFWLRQV /LQH
,WHP 4XHVWLRQ 5HVSRQVH
6DOHVௐIRUFH 2XUௐVDOHVௐIRUFHௐFRQVLVWVௐRIௐGLUHFWௐDQGௐDQௐLQGLUHFWௐVDOHVௐIRUFHௐ2XUௐGLUHFWௐVDOHVௐIRUFHௐFRQVLVWVௐRIௐGLUHFWௐ HPSOR\HHVௐDQGௐSDUWQHUௐGHDOHUVௐZKLFKௐH[FHHGVௐDQௐHPSOR\HHௐFRXQWௐRIௐௐSHUVRQQHOௐERWKௐIXOOௐWLPHௐDQGௐ SDUWௐWLPHௐ0DQ\ௐRIௐRXUௐVDOHVௐIRUFHௐDUHௐVSUHDGௐDFURVVௐWKHௐ86ௐDQGௐZHௐOHYHUDJHௐRXUௐUHODWLRQVKLSVௐZLWKௐ RXUௐODUJHUௐFODVVௐGHDOHUVKLSVௐWRௐVHUYLFHௐWKHௐPHPEHUVௐORZHUௐFODVVௐYHKLFOHௐQHHGVௐDVௐZHOOௐ$ௐFURVVௐVDOHVௐ IRUFHௐ7KHVHௐLQGLYLGXDOVௐKHOSௐVXSSRUWௐRXUௐGHDOHUVKLSVௐDQGௐ1$)*ௐ)OHHWௐ'LYLVLRQௐGLUHFWO\ௐ2QௐWKHௐRWKHUௐ KDQGௐRXUௐLQGLUHFWௐVDOHVௐIRUFHௐPDGHௐXSௐRIௐXSILWWHUVௐDQGௐSDUWQHUௐVXSSOLHUVௐFRQVLVWVௐRIௐRYHUௐௐSHUVRQQHOௐ ZLWKௐRXUௐSDUWQHUௐQHWZRUNௐDQGௐVDOHVௐIRUFHௐJURZLQJௐDQQXDOO\ௐ :LWKௐERWKௐGLUHFWௐDQGௐLQGLUHFWௐVDOHVௐIRUFHௐVWDIIௐZRUNLQJௐWRJHWKHUௐ1$)*ௐKDVௐEHHQௐDEOHௐWRௐVXFFHVVIXOO\ௐ JURZௐPDLQWDLQௐDQGௐVHUYLFHௐWKHௐGHPDQGௐRIௐWKHௐPHPEHUVௐ$VௐWKHௐQXPEHUௐRIௐ\RXUௐPHPEHUVௐJURZௐZHௐZLOOௐ FRQWLQXRXVO\ௐZHOFRPHௐPRUHௐVWDIIௐWRௐQRWௐRQO\ௐPHHWௐFXVWRPHUௐGHPDQGௐEXWௐDOVRௐWRௐH[FHHGௐFXVWRPHUௐ H[SHFWDWLRQV
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
'HDOHUௐQHWZRUNௐRUௐRWKHUௐGLVWULEXWLRQௐPHWKRGV 2XUௐIUDQFKLVHௐQHWZRUNௐLQௐ&DQDGDௐDQGௐWKHௐ86ௐLVௐIRUWXQDWHO\ௐVHFRQGௐWRௐQRQHௐ2XUௐௐSURSRVHGௐ2(06ௐ SUHYLRXVO\ௐPHQWLRQHGௐDOOௐRIௐZKLFKௐKDYHௐHVWDEOLVKHGௐDௐSUHVHQFHௐQDWLRQZLGHௐZLWKௐIDFWRU\ௐVWRUHVௐ VWUDWHJLFDOO\ௐSODFHGௐZKHUHௐDOOௐPHPEHUVௐFDQௐUHFHLYHௐVHUYLFHௐDQGௐFRPSOHWHௐZDUUDQW\ௐUHSDLUVௐZLWKௐWKHLUௐ UHVSHFWLYHௐSURGXFWV
ௐ6LPSOHௐSXWௐWKHௐ1RUWKௐ$PHULFDQௐDQGௐ&DQDGLDQௐDXWRPRELOHௐVXSSO\ௐFKDLQௐQHWZRUNௐLVௐRQHௐRIௐWKHௐEHVWௐLQௐ WKHௐZRUOGௐ2IௐWKHௐௐEUDQGVௐZHௐUHSUHVHQWௐWKHௐ2(0VௐKDYHௐSXWௐLQௐSODFHௐDௐGHDOHUௐQHWZRUNௐDFURVVௐDOOௐௐ VWDWHVௐWKDWௐZLOOௐDOORZௐXVௐWRௐEHVWௐVHUYHௐDOOௐPHPEHUV
6HUYLFHௐIRUFH 7KHௐௐPDQXIDFWXUHVௐZHௐUHSUHVHQWௐKDYHௐWKRXVDQGVௐRIௐVHUYLFHௐORFDWLRQVௐWKDWௐZRXOGௐEHௐHDVLO\ௐDFFHVVLEOHௐ WRௐDOOௐ\RXUௐPHPEHUVௐ6HUYLFHௐFHQWHUVௐDQGௐZDUUDQW\ௐUHSDLUௐIDFLOLWLHVௐIRUௐDOOௐௐ2(0VௐDUHௐDPSOHௐDQGௐ UHDG\ௐWRௐKHOSௐVHUYLFHௐRXUௐPHPEHUVௐDQGௐWKHLUௐQHHGVௐ+RZHYHUௐ$ODVNDௐDQGௐ+DZDLLௐPD\ௐEHௐH[FHSWLRQVௐ DVௐWKH\ௐPD\ௐKDYHௐIDUWKHUௐGLVWDQFHVௐEHWZHHQௐIUDQFKLVHVௐZKHUHௐPHPEHUVௐFDQௐXWLOL]HௐWKHௐUHSDLUௐVHUYLFHV
'HVFULEHௐWKHௐRUGHULQJௐSURFHVVௐ,IௐRUGHUVௐZLOOௐEHௐ
KDQGOHGௐE\ௐGLVWULEXWRUVௐGHDOHUVௐRUௐRWKHUVௐH[SODLQௐWKHௐ UHVSHFWLYHௐUROHVௐRIௐWKHௐ3URSRVHUௐDQGௐRWKHUV
7KHௐPHPEHUௐPD\ௐRUGHUௐWKHLUௐYHKLFOHVௐE\ௐQDYLJDWLQJௐWRௐRXUௐZHEVLWHௐZZZ1DWLRQDO$XWR)OHHW*URXSFRPௐ DQGௐJRLQJௐWKURXJKௐWKHௐVWHSE\VWHSௐSURFHVVௐWRௐJHQHUDWHௐDQௐRQOLQHௐTXRWHௐRUௐE\ௐFDOOLQJௐRQHௐRIௐRXUௐ UHSUHVHQWDWLYHVௐDWௐ
ௐRUௐE\ௐVHQGLQJௐ1$)*ௐDQௐHPDLOௐDWௐ)OHHW#1DWLRQDO$XWR)OHHW*URXSFRPௐ 2UGHUVௐDUHௐWKHQௐSURFHVVHGௐGLUHFWO\ௐWRௐWKHௐPDQXIDFWXUHUௐZKRௐZLOOௐZRUNௐWRௐVXSSO\ௐWKHௐYHKLFOHௐWRௐWKHௐVKLS WRௐORFDWLRQௐIRUௐXSILWWLQLJௐRUௐHQGௐXVHUௐGHVLUHGௐGHOLYHU\ௐORFDWLRQ
'HVFULEHௐLQௐGHWDLOௐWKHௐSURFHVVௐDQGௐSURFHGXUHௐRIௐ
\RXUௐFXVWRPHUௐVHUYLFHௐSURJUDPௐLIௐDSSOLFDEOHௐௐ
,QFOXGHௐ\RXUௐUHVSRQVHWLPHௐFDSDELOLWLHVௐDQGௐ
FRPPLWPHQWVௐDVௐZHOOௐDVௐDQ\ௐLQFHQWLYHVௐWKDWௐKHOSௐ
\RXUௐSURYLGHUVௐPHHWௐ\RXUௐVWDWHGௐVHUYLFHௐJRDOVௐRUௐ
SURPLVHV
7RௐEHVWௐGHPRQVWUDWHௐRXUௐ&XVWRPHUௐ6HUYLFHௐSURJUDPௐNLQGO\ௐUHIHUHQFHௐWKHௐ=,3ௐILOHௐ³0HPEHUௐ:DONௐ 7KURXJK´ௐWKDWௐLVௐDWWDFKHGௐLQௐWKHௐ$GGLWLRQDOௐ'RFXPHQWVௐIROGHUௐ3OHDVHௐEHJLQௐZLWKௐDQGௐUHYLHZௐLQௐRUGHUௐWKDWௐ LVௐH[SODLQHGௐEHORZ
ௐ
+RZௐ0HPEHUVௐ&DQௐ*HWௐ4XRWHVௐ2QOLQH
ௐௐ$ௐPHPEHUௐFDQௐREWDLQௐPRVWௐTXRWHVௐE\ௐYLVLWLQJௐRXUௐZHEVLWHௐ ZZZ1DWLRQDO$XWR)OHHW*URXSFRPௐZKHUHௐDௐVLPSOHௐRQHௐVWHSௐIRUPௐLVௐQHHGHGௐIRUௐUHJLVWUDWLRQௐ7KLVௐLVௐWRௐ SURWHFWௐWKHௐSULFHௐLQIRUPDWLRQௐIURPௐQRQPHPEHUVௐ2QFHௐDௐPHPEHUௐUHJLVWHUVௐWKH\ௐZLOOௐUHFHLYHௐDQௐ DXWRPDWHGௐZHOFRPHௐHPDLOௐZLWKௐDௐGHPRௐYLGHRௐRQௐKRZௐWRௐXVHௐRXUௐVLWHௐ0HPEHUVௐZLOOௐJDLQௐDFFHVVௐWRௐ WKHUHௐYHU\ௐRZQௐGDVKERDUGௐZKLFKௐZLOOௐKRXVHௐDOOௐWKHUHௐTXRWHVௐLQௐRQHௐVDIHௐVHFXUHௐORJLQௐ0HPEHU¶VௐFDQௐ VHOHFWௐZKLFKௐEUDQGௐWKH\ௐDUHௐORRNLQJௐIRUௐDQGௐPRGHOௐ\HDUௐ2XUௐVLWHௐVKRZVௐDOOௐWKHௐFDWHJRULHVௐWKHௐEUDQGௐ RIIHUVௐVXFKௐDV
ௐ&DUVௐ9DQVௐ689¶Vௐ7UXFNVௐDQGௐ&KDVVLVௐ&DEVௐ0HPEHUVௐZLOOௐWKHQௐEHௐDEOHௐWRௐGULOOௐGRZQௐ IRUௐWKHௐULJKWௐVHOHFWLRQௐE\ௐSLFNLQJௐIURPௐWKHௐILOWHUௐPHQXௐRIௐZKDWௐFDEௐWKHUHௐORRNLQJௐIRUௐ 5HJXODUௐ([WHQGHGௐ
RUௐ&UHZ
ௐWRௐௐZKHHOௐRUௐௐZKHHOௐGULYHௐGRZQௐWRௐWKHௐEHGௐOHQJWKௐWKHUHௐORRNLQJௐIRUௐௐ$OOௐIDFWRU\ௐRSWLRQVௐDUHௐ WKHQௐSUHVHQWHGௐIRUௐWKHௐPHPEHUௐWRௐVHOHFWௐIURPௐWKLVௐZLOOௐVKRZௐDOOௐFXUUHQWௐIDFWRU\ௐRUGHUDEOHௐRSWLRQVௐWDNLQJௐ WKHௐJXHVVௐZRUNௐRXWௐIRUௐWKHௐPHPEHUௐ2QFHௐDௐPHPEHUௐVHOHFWVௐDௐGHVLUHௐEXLOGௐWKH\ௐZLOOௐVHHௐWKHUHௐ 6RXUFHZHOOௐ3ULFHௐUHSRUWௐVKRZLQJௐWKHௐ0653ௐWKHUHௐFRQWUDFWௐSULFHௐWKHௐVDYLQJௐLQௐUHDOௐGROODUVௐDQGௐDVௐDௐ SHUFHQWDJHௐ,QௐWKHௐ3')ௐH[DPSOHௐ\RXௐFDQௐVHHௐDௐVDYLQJௐRIௐௐ
ௐRIௐௐWRௐWKHௐPHPEHUௐ
VKRZLQJௐDௐVLJQLILFDQWௐVDYLQJVௐ0HPEHUVௐWKHQௐFDQௐFKRVHௐWRௐDGGௐH[WUD¶VௐWRௐWKHUHௐRUGHUௐOLNHௐH[WUDௐNH\V¶ௐ VHUYLFHௐPDQXDOVௐVDOHVௐWD[ௐDQGௐHYHQௐUHTXHVWௐDQௐXSILWௐWRௐEHௐDGGHGௐWRௐWKHUHௐTXRWHௐ/DVWO\ௐWKH\ௐZLOOௐEHௐ JLYHQௐDௐFRPSOHWHௐWXUQௐNH\ௐTXRWHௐSDFNDJHௐWRௐSULQWௐZKLFKௐZLOOௐLQFOXGHௐWKHUHௐFXVWRPL]HGௐ4XRWHௐ,'ௐ 'HVFULSWLRQௐDQGௐ6SHFLILFDWLRQVௐRIௐZKDWௐWKH\ௐEXLOWௐௐௐ
+RZௐ0HPEHUVௐDQGௐ8SILWWHUVௐFDQௐ3DUWQHUௐZLWKௐ1$)*
ௐ2XUௐGHGLFDWHGௐZHEVLWHௐZZZ1$)*3DUWQHUFRPௐZDVௐ
EXLOWௐWRௐDFFRPPRGDWHௐWKHௐPHPEHUௐZKRௐZRXOGௐOLNHௐDௐFHUWDLQௐXSILWWHUௐWRௐXSILWௐWKHUHௐYHKLFOHVௐ,WௐZDVௐDOVRௐ EXLOWௐIRUௐXSILWWHUVௐWRௐKDYHௐDௐSODFHௐWRௐJRௐZKHUHௐWKH\ௐFDQௐILQGௐLQIRUPDWLRQௐRQௐKRZௐWRௐSDUWQHUௐZLWKௐ1$)*ௐ WRௐEHWWHUௐVHUYHௐWKHUHௐORFDOௐPHPEHUVௐ
([DPSOHௐRIௐ$ௐ0HPEHUௐZLWKௐ8SILWௐ4XRWH
ௐ7KLVௐLVௐDQௐH[DPSOHௐRIௐKRZௐZHௐXVHௐRXUௐ&DEௐ&KDVVLVௐDQGௐ
FRPELQHௐWKHPௐZLWKௐDQௐXSILWௐWRௐSURYLGHௐDௐWXUQNH\ௐVROXWLRQௐIRUௐWKHௐPHPEHUௐLQௐDௐVLPSOHௐWRௐIROORZௐIRUPDWௐ (7$ௐ6\VWHPௐIRUௐ0HPEHUVௐ:DONௐ7KURXJK
ௐ7KLVௐLVௐZKHUHௐPHPEHUVௐFDQௐHDVLO\ௐFRPHௐWRௐRXUௐZHEVLWHௐWKHௐ VDPHௐZHEVLWHௐWKH\ௐEXLOWௐWKHUHௐFKDVVLVௐRQௐDQGௐWUDFNௐWKHUHௐRUGHUௐOLNHௐWKH\ௐZRXOGௐDௐ836ௐSDFNDJHௐ:Hௐ KDYHௐDௐYHU\ௐVLPSOHௐGLVSOD\ௐRQௐRXUௐKRPHSDJHௐ³7UDFNௐ\RXUௐRUGHU´ௐZKHUHௐPHPEHUVௐFDQௐHQWHUௐRQHௐRIௐWKHௐ
IROORZLQJ
ௐ3XUFKDVHௐ2UGHUௐ1XPEHUௐ4XRWHௐ,'ௐ8SILWௐ4XRWHௐ,'ௐRUௐYLQௐWRௐHDVLO\ௐVHHௐWKHUHௐLQௐWKHௐSURFHVVௐ WKHUHௐSDUWLFXODUௐRUGHUௐLVௐLQௐ
&RXUWHV\ௐ&RQILUPDWLRQௐ([SODLQHG
ௐ$IWHUௐ1$)*ௐUHFHLYHVௐDQௐRUGHUௐIURPௐDௐ0HPEHUௐZHௐDOZD\VௐOLNHௐWRௐ VHQGௐWKHPௐDௐ&RXUWHV\ௐ&RQILUPDWLRQௐ7KLVௐLVௐZHUHௐWKHௐPHPEHUௐZLOOௐGRXEOHௐFKHFNௐVRPHௐSDUWLFXODUVௐRQௐ WKHUHௐRUGHUௐOLNHௐ&RORUௐ4XDQWLW\ௐ8SILWௐDQGௐ6SHFLILFDWLRQ¶VௐDUHௐDOOௐFRUUHFWௐEHIRUHௐRUGHUௐSODFHPHQWௐௐ:Hௐ DOVRௐOLNHௐWRௐDVNௐIRUௐWLWOHௐLQIRUPDWLRQௐDWௐWKLVௐSRLQWௐVRௐZHௐFDQௐKHOSௐSURFHVVௐWKHௐSDSHUZRUNௐDWௐGHOLYHU\ௐ SURPSWO\
ௐௐ)DFWRU\ௐ2UGHUௐ&XWௐ2IIௐ1RWLFHV
ௐ+HUHௐLVௐZHUHௐZHௐOLNHௐWRௐKLJKOLJKWௐZHUHௐPHPEHUVௐFDQௐDFFHVVௐDQ\ௐ XSFRPLQJௐIDFWRU\ௐRUGHUௐFXWௐRIIௐGDWHVௐ:HௐZDONௐWKHPௐWKURXJKௐWKHௐSURFHVVௐVWHSௐE\ௐVWHSௐWRௐHQVXUHௐ HYHU\RQHௐNQRZVௐWKHௐXSFRPLQJௐRUGHUௐFXWௐRIIௐGDWHௐZHௐHYHQௐSULQWௐWKLVௐLQIRUPDWLRQௐ LIௐNQRZQௐDWௐWKHௐWLPH
ௐ
ULJKWௐRQௐWKHௐFRYHUௐSDJHௐRIௐWKHUHௐTXRWHVௐ
9DOLGDWLRQௐ:DONௐ7KURXJKௐ([DPSOH
ௐ7RௐGHPRQVWUDWHௐDௐSULFHௐYDOLGDWLRQௐZHௐVKRZௐZKDWௐDௐPHPEHUௐZRXOGௐ VHHௐZKHQௐWKH\ௐEXLOGௐDௐWUXFNௐRQௐRXUௐVLWHௐ$WௐFKHFNௐRXWௐWKHௐPHPEHUௐZRXOGௐVHHௐWKHௐ7RWDOௐ&RQILJXUHGௐ 0653ௐRIௐௐௐ$ௐ6RXUFHZHOOௐ3ULFHௐRIௐௐௐ7RWDOௐ6DYLQJௐRIௐௐ ௐRUௐௐIRUௐ
Dௐௐ)ௐIROORZHGௐE\ௐWKHௐSULFLQJௐSDJHௐZKLFKௐVKRZVௐWKHௐ0LQLPXPௐ'LVFRXQWௐRIௐDWௐOHDVWௐௐ$Vௐ \RXௐVHHௐZHௐSURYLGHGௐDQௐDGGLWLRQDOௐௐGLVFRXQWௐRQௐWRSௐRIௐWKHௐௐFRQWUDFWௐGLVFRXQWௐ7KLVௐZRXOGௐEHௐ WKHௐFDVHௐLQௐPRVWௐLQVWDQFHV
'HVFULEHௐ\RXUௐDELOLW\ௐDQGௐZLOOLQJQHVVௐWRௐSURYLGHௐ\RXUௐ SURGXFWVௐDQGௐVHUYLFHVௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐ
HQWLWLHVௐLQௐWKHௐ8QLWHGௐ6WDWHV
2XUௐZLOOLQJQHVVௐDQGௐDELOLW\ௐWRௐVHUYLFHௐPHPEHUVௐQDWLRQZLGHௐLVௐXQSDUDOOHOHGௐ:HௐKDYHௐGHGLFDWHGௐVWDIIௐௐ GD\VௐDௐZHHNௐIURPௐDPௐWRௐSPௐVWDQGLQJௐE\ௐUHDG\ௐWRௐDVVLVWௐDQ\ௐPHPEHUௐKHOSௐILQGௐWKHௐEHVWௐVROXWLRQௐIRUௐ WKHUHௐQHHGVௐHYHQௐLIௐKHOSLQJௐDVVLVWௐWKHPௐWRௐWKHௐEHVWௐ6RXUFHZHOOௐ&RQWUDFWௐWKDWௐFRXOGௐEHௐDௐVROXWLRQௐ:Hௐ KDYHௐDௐGHGLFDWHGௐOLYHௐFKDWௐIHDWXUHௐRQௐRXUௐRQOLQHௐTXRWHௐJHQHUDWLQJௐZHEVLWHௐLQௐFDVHௐDQ\ௐPHPEHUௐKDVௐ DQ\ௐWURXEOHௐDWௐDOOௐLQௐEXLOGLQJௐWKHUHௐTXRWHVௐ1$)*ௐKDVௐHVWDEOLVKHGௐDௐFKDLQௐRIௐVXSSOLHUVௐZKRௐDUHௐDWௐWKHௐ UHDG\ௐWRௐVHUYHௐLIௐFDOOHGௐXSRQௐE\ௐDQ\ௐPHPEHUௐ:HௐDUHௐKHUHௐWRௐKHOS
'HVFULEHௐ\RXUௐDELOLW\ௐDQGௐZLOOLQJQHVVௐWRௐSURYLGHௐ\RXUௐ SURGXFWVௐDQGௐVHUYLFHVௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐ
HQWLWLHVௐLQௐ&DQDGD
:HௐDUHௐZLOOLQJௐDQGௐHDJHUௐWRௐVRRQௐH[WHQGௐRXUௐEXVLQHVVௐPRGHOௐDQGௐQHWZRUNௐLQWRௐ&DQDGDௐ:HௐEHOLHYHௐ SDUWQHULQJௐZLWKௐORFDOௐ&DQDGLDQௐEDVHGௐGHDOHUௐJURXSVௐLVௐNH\ௐWRௐVXFFHVVௐLQௐWKHௐ&DQDGLDQௐPDUNHWௐ1$)*¶Vௐ FRPSHWLWLYHௐSULFLQJௐDVௐZHOOௐDVௐDௐVLPSOHௐ86ௐ'ROODUௐWRௐ&DQDGLDQௐFRQYHUVDWLRQௐZLOOௐKHOSௐ1$)*ௐH[SDQGௐ LQWRௐWKHௐ&DQDGLDQௐPDUNHWௐIRUௐSDUWLFLSDWLQJௐ6RXUFHZHOOௐPHPEHUV
,GHQWLI\ௐDQ\ௐJHRJUDSKLFௐDUHDVௐRIௐWKHௐ8QLWHGௐ6WDWHVௐ
RUௐ&DQDGDௐWKDWௐ\RXௐZLOOௐ127ௐEHௐIXOO\ௐVHUYLQJௐWKURXJKௐ
WKHௐSURSRVHGௐFRQWUDFW
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐZLOOௐKDQGOHௐVHUYLFLQJௐௐRIௐDOOௐJHRJUDSKLFௐDUHDVௐORFDWHGௐLQௐWKHௐ8QLWHGௐ 6WDWHVௐௐ$OWKRXJKௐLWௐLVௐXQFOHDUௐZKDWௐXQVHHQௐREVWDFOHVௐZHௐPD\ௐIDFHௐLQௐ&DQDGDௐ1$)*ௐLVௐFRPPLWWHGௐWRௐ EXLOGLQJௐWKHௐVDPHௐPRGHOௐWRௐVHUYLFHௐ&DQDGDௐDQGௐSURYLGLQJௐWKHௐVDPHௐOHYHOௐRIௐFXVWRPHUௐVDWLVIDFWLRQௐ VHUYLFHௐDQGௐFDUHௐDVௐLQௐWKHௐ8QLWHGௐ6WDWHV
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
,GHQWLI\ௐDQ\ௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLW\ௐVHFWRUVௐ
LHௐJRYHUQPHQWௐHGXFDWLRQௐQRWIRUSURILW
ௐWKDWௐ\RXௐ
ZLOOௐ127ௐEHௐIXOO\ௐVHUYLQJௐWKURXJKௐWKHௐSURSRVHGௐ
FRQWUDFWௐ([SODLQௐLQௐGHWDLOௐ)RUௐH[DPSOHௐGRHVௐ\RXUௐ
FRPSDQ\ௐKDYHௐRQO\ௐDௐUHJLRQDOௐSUHVHQFHௐRUௐGRௐRWKHUௐ
FRRSHUDWLYHௐSXUFKDVLQJௐFRQWUDFWVௐOLPLWௐ\RXUௐDELOLW\ௐWRௐ SURPRWHௐDQRWKHUௐFRQWUDFW"
1$)*ௐZLOOௐFRQWLQXHௐWRௐVHUYLFHௐDOOௐ6RXUFHZHOOௐ0HPEHUVௐWKURXJKௐRXUௐௐKRXUௐDௐGD\ௐௐGD\VௐDௐZHHNௐ RQOLQHௐSRUWDOௐZLWKௐWKHௐH[FOXVLRQௐRIௐ1RQ3URILWVௐ8QIRUWXQDWHO\ௐ1RQ3URILWVௐDUHௐRIWHQௐQRWௐHOLJLEOHௐIRUௐWKHௐ VDPHௐGLVFRXQW¶VௐJRYHUQPHQWௐHQWLWLHVௐDUHௐTXDOLILHGௐIRUௐ+RZHYHUௐ1RQ3URILWVௐDUHௐVXEMHFWௐWRௐDௐGLIIHUHQWௐ SULFLQJௐSURJUDPௐDQGௐZLOOௐEHௐHYDOXDWHGௐRQௐDௐFDVHௐWRௐFDVHௐEDVLV
'HILQHௐDQ\ௐVSHFLILFௐFRQWUDFWௐUHTXLUHPHQWVௐRUௐ
UHVWULFWLRQVௐWKDWௐZRXOGௐDSSO\ௐWRௐRXUௐSDUWLFLSDWLQJௐ
HQWLWLHVௐLQௐ+DZDLLௐDQGௐ$ODVNDௐDQGௐLQௐ86ௐ7HUULWRULHV
7KHௐRQO\ௐSRVVLEOHௐORJLVWLFDOௐFRQVWUDLQWVௐZHௐPD\ௐIDFHௐLVௐWKHௐVKLSSLQJௐFRQVWUDLQWVௐIRUௐVKLSPHQWVௐDUULYLQJௐLQௐ $ODVNDௐ+DZDLLௐDQGௐ86ௐ7HUULWRULHVௐ)RUௐH[DPSOHௐZHௐRIWHQௐSURYLGHௐPHPEHUVௐLQௐ$ODVNDௐRUௐ+DZDLLௐZLWKௐ YHKLFOHVௐWKDWௐRIWHQௐKDYHௐXSILWVௐ7RௐFLUFXPYHQWௐWKLVௐSRWHQWLDOௐLVVXHௐPHPEHUVௐDOORZௐXVௐWRௐDGGௐWKHVHௐH[WUDௐ VKLSSLQJௐDQGௐSRUWௐFRVWVௐWRௐWKHLUௐTXRWHV
7DEOH
0DUNHWLQJ3ODQ
/LQH
,WHP 4XHVWLRQ 5HVSRQVH
'HVFULEHௐ\RXUௐPDUNHWLQJௐVWUDWHJ\ௐIRUௐSURPRWLQJௐ
WKLVௐFRQWUDFWௐRSSRUWXQLW\ௐௐ8SORDGௐ
UHSUHVHQWDWLYHௐVDPSOHVௐRIௐ\RXUௐPDUNHWLQJௐ
PDWHULDOVௐ
LIௐDSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐ
XSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐHQFRPSDVVHVௐDௐYDULHW\ௐRIௐPDUNHWLQJௐVWUDWHJLHVௐWRௐSURPRWHௐRXUௐSURGXFWVௐDQGௐ VHUYLFHVௐWRௐVWUHDPOLQHௐWKHௐYHKLFOHௐSXUFKDVLQJௐSURFHVVௐIRUௐJRYHUQPHQWௐHQWLWLHVௐௐௐ%HORZௐDUHௐDௐIHZௐVWUDWHJLHVௐ XVHGௐWRௐVHUYHௐDVௐWKHௐJDWHZD\ௐEHWZHHQௐRXUௐEXVLQHVVௐDQGௐSXEOLFௐDJHQFLHVௐௐ :HEVLWHௐDQGௐ,QERXQGௐ0DUNHWLQJ
ௐௐ7KHௐFUHDWLRQௐRIௐDௐSURIHVVLRQDOௐFXVWRPHUIRFXVHGௐZHEVLWHௐLVௐRQHௐRIௐRXUௐPDLQௐ IHDWXUHVௐWRௐPDUNHWௐRXUௐSURGXFWVௐDQGௐVHUYLFHVௐ7KHௐ1$)*ௐZHEVLWHௐHQFRXUDJHVௐRXUௐPHPEHUVௐWRௐLQWHUDFWௐDQGௐ EURZVHௐWKURXJKௐSURGXFWVௐRIIHUHGௐDORQJௐZLWKௐSULFLQJௐDQGௐLQIRUPDWLRQௐDERXWௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐ,QERXQGௐ PDUNHWLQJௐLVௐFUHDWHGௐZKHQௐSRWHQWLDOௐPHPEHUVௐDUHௐGLUHFWHGௐWRௐWKHௐFRPSDQ\ௐZHEVLWHௐௐ:LWKௐWKLVௐPHWKRGௐZHௐ DUHௐDEOHௐWRௐQRWௐRQO\ௐFRQQHFWௐZLWKௐPHPEHUVௐEXWௐWRௐSXWௐWKHௐSXUFKDVLQJௐDELOLW\ௐLQWRௐWKHௐKDQGVௐRIௐHDFKௐPHPEHUௐௐ 2XUௐLQERXQGௐPDUNHWLQJௐVWUDWHJ\ௐDWWUDFWVௐPHPEHUVௐE\ௐFUHDWLQJௐYDOXDEOHௐFRQWHQWௐDQGௐH[SHULHQFHVௐWDLORUHGௐWRௐWKHௐ QHHGVௐRIௐHDFKௐLQGLYLGXDOௐ([DPSOHVௐLQFOXGHௐHPDLOௐFDPSDLJQௐIO\HUVௐRQௐRXUௐSURGXFWVௐLQIRUPDWLYHௐDQGௐKRZWRௐ YLGHRVௐVRFLDOௐPHGLDௐDQGௐHQJDJLQJௐPHPEHUVௐZLWKௐWRSQRWFKHGௐFXVWRPHUௐVHUYLFHௐWRௐEXLOGௐEUDQGௐDZDUHQHVVௐ (PDLOௐ0DUNHWLQJ
ௐ2QHௐRIௐWKHௐPDLQௐVWUDWHJLHVௐXVHGௐWRௐHQJDJHௐFXUUHQWௐDQGௐSRWHQWLDOௐPHPEHUVௐLVௐ(PDLOௐ 0DUNHWLQJௐ2XUௐHPDLOVௐLQFOXGHௐGLIIHUHQWௐW\SHVௐRIௐIO\HUVௐWKDWௐFRQVLVWௐRIௐLQIRUPDWLRQௐRIௐWKHௐ6RXUFHZHOOௐFRQWUDFWௐ SURPRWLQJௐPDQXIDFWXUHUௐEUDQGVௐKROLGD\ௐWKHPHGௐIO\HUVௐGLVFRXQWVௐRIIHUHGௐWRௐILUVWௐWLPHௐEX\HUVௐLPSRUWDQWௐFXWRIIௐ GDWHௐUHPLQGHUVௐDQGௐXSFRPLQJௐSURGXFWVௐDQGௐHYHQWVௐௐ
7KHௐXVHௐRIௐPDUNHWLQJௐFDPSDLJQVௐSOD\VௐDௐPDMRUௐUROHௐLQௐHQKDQFLQJௐWKHௐJURZWKௐRIௐRXUௐFOLHQWௐGDWDEDVHௐௐ(PDLOVௐ DUHௐDௐELJௐSDUWௐRIௐRXUௐGDLO\ௐOLYHVௐGXHௐWRௐJRYHUQPHQWௐDJHQF\ௐHPSOR\HHVௐXWLOL]LQJௐHPDLOVௐDVௐWKHLUௐPDLQௐVRXUFHௐRIௐ FRPPXQLFDWLRQௐௐ:HௐXVHௐFDPSDLJQHUFRPௐDVௐWKHௐHPDLOLQJௐSODWIRUPௐWRௐUHDFKௐRXUௐWDUJHWௐPHPEHUVௐௐ9LGHRVௐDQGௐ GHVFULSWLYHௐLPDJHVௐDUHௐXVHGௐRQௐDOOௐIO\HUVௐDQGௐDUHௐFRPSDWLEOHௐZLWKௐDௐGHVNWRSௐRUௐPRELOHௐGHYLFHௐௐ0HVVDJHVௐ DUHௐVKRUWௐDQGௐWRௐWKHௐSRLQWௐZLWKௐOLQNVௐOHDGLQJௐWRௐWKHௐ6RXUFHZHOOௐDQGௐ1$)*ௐKRPHSDJHௐௐ7KHௐ&DPSDLJQHUௐHPDLOௐ V\VWHPௐDOORZVௐWKHௐDELOLW\ௐWRௐWUDFNௐHPDLOௐDFWLYLW\ௐEDVHGௐRQௐRSHQௐUDWHௐXQVXEVFULEHVௐDQGௐOLQNௐFOLFNVௐZKLFKௐLVௐ EHQHILFLDOௐWRௐXQGHUVWDQGLQJௐHPDLOௐHIIHFWLYHQHVVௐௐ
2QFHௐSRWHQWLDOௐPHPEHUVௐDUHௐGLUHFWHGௐWRௐRXUௐZHEVLWHௐWKH\ௐDUHௐZHOFRPHGௐZLWKௐDௐZLGHௐUDQJHௐRIௐRSWLRQVௐWRௐ H[SORUHௐDQௐDUUD\ௐRIௐRXUௐSURGXFWVௐDQGௐVHUYLFHVௐ7KH\ௐDUHௐDEOHௐWRௐUHJLVWHUௐWRௐEHFRPHௐDௐPHPEHUௐYLHZௐSULFLQJௐ H[SORUHௐDYDLODEOHௐLQVWRFNௐYHKLFOHVௐYLHZௐKRZWRYLGHRVௐEXLOGௐDௐYHKLFOHௐRQOLQHௐWRௐUHTXHVWௐDQௐLPPHGLDWHௐTXRWHௐ RUௐXVHௐRXUௐOLYHௐFKDWௐDVVLVWDQWௐRUௐFDOOHPDLOௐIRUௐOLYHௐVXSSRUWௐ )DFHௐWRௐ)DFHௐ0DUNHWLQJௐ6WUDWHJLHV
ௐௐ7KLVௐVWUDWHJ\ௐKDVௐSURYHQௐWRௐEHௐVXFFHVVIXOௐLQௐJHQHUDWLQJௐOHDGVௐDQGௐ FUHDWLQJௐODVWLQJௐUHODWLRQVKLSVௐE\ௐGHYHORSLQJௐJHQXLQHௐFRQQHFWLRQVௐZLWKௐSURVSHFWLYHௐPHPEHUVௐௐ1DWLRQDOௐ$XWRௐ )OHHWௐ*URXSௐDWWHQGVௐVHYHUDOௐWUDGHVௐVKRZVௐSHUௐ\HDUௐWRௐHQJDJHௐPHPEHUVௐDQGௐSXWௐDௐIDFHௐWRௐWKHௐFRPSDQ\ௐ7KLVௐ LQௐSHUVRQௐPHHWLQJௐDLGVௐWRௐEXLOGௐWKHௐEUDQGௐE\ௐQXUWXULQJௐUHODWLRQVKLSVௐEHWZHHQௐPHPEHUVௐDQGௐRWKHUௐYHQGRUVௐ DVVRFLDWHGௐWKURXJKௐWKHௐSURFHVVௐௐௐ7UDGHௐVKRZVௐDWWHQGHGௐLQFOXGHௐ*);ௐ,$332ௐ1,*3ௐ$&7ௐ&$332ௐDQGௐ &$6%2ௐWKURXJKRXWௐWKHௐ8QLWHGௐ6WDWHVௐௐ
1$)*ௐKDVௐPDQ\ௐRSSRUWXQLWLHVௐWRௐPDNHௐLQௐSHUVRQௐSUHVHQWDWLRQVௐWRௐSURSRVHௐSURGXFWVௐVHUYLFHVௐRIIHUHGௐDQGௐWRௐ DQVZHUௐDQ\ௐTXHVWLRQVௐSRWHQWLDOௐPHPEHUVௐPD\ௐKDYHௐௐ7KHVHௐ3RZHU3RLQWௐ3UHVHQWDWLRQVௐLQFOXGHௐWRSLFVௐRQௐ 1$)*6RXUFHZHOOௐSURFHVVௐKRZௐWRௐIDFLOLWDWHௐWKHௐYHKLFOHௐSXUFKDVLQJௐZLWKRXWௐELGGLQJௐLQIRUPDWLRQDOௐYLGHRVௐDQGௐ WKHௐEUDQGVௐDQGௐVHUYLFHVௐZHௐSURYLGHௐ7KHVHௐPHHWLQJVௐKDYHௐEHHQௐKHOGௐDWௐORFDOௐFLWLHVௐFRXQWLHVௐVFKRROௐGLVWULFWVௐ ZDWHUௐGLVWULFWVௐDQGௐSRUWV
5HODWLRQVKLSௐ0DUNHWLQJௐLVௐDௐYLWDOௐVWUDWHJ\ௐXVHGௐLQௐEXLOGLQJௐDQGௐPDLQWDLQLQJௐORQJWHUPௐUHODWLRQVKLSVௐSUDFWLFHGௐE\ௐ 1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐRQௐDௐGDLO\ௐEDVLVௐௐ
1$)*ௐVWULYHVௐWRௐFUHDWHௐDௐSRVLWLYHௐDQGௐVXSSRUWLYHௐFRQQHFWLRQௐZLWKௐPHPEHUVௐE\ௐSURYLGLQJௐSHUVRQDOL]HGௐDQGௐ UHVSRQVLYHௐFXVWRPHUௐVHUYLFHௐSUDFWLFHVௐௐ7KHௐVDOHVௐWHDPௐKDVௐZRUNHGௐWLUHOHVVO\ௐWRௐIRFXVௐRQௐSURYLGLQJௐ RXWVWDQGLQJௐFXVWRPHUௐVXSSRUWௐWRௐFUHDWHௐDௐSRZHUIXOௐUDSSRUWௐZLWKௐH[LVWLQJௐDQGௐQHZௐPHPEHUVௐௐ%\ௐJRLQJௐDERYHௐ DQGௐEH\RQGௐWKH\ௐKDYHௐHQKDQFHGௐH[LVWLQJௐUHODWLRQVKLSVௐDQGௐH[HFXWHGௐFXVWRPHUௐOR\DOW\ௐZLWKௐUHSHDWௐEXVLQHVVHVௐௐ 7KH\ௐVWULYHௐWRௐGHYLDWHௐIURPௐWKHௐ³&DUௐ6DOHVSHUVRQ´ௐPHQWDOLW\ௐZKLFKௐLVௐௐVDOHVௐGULYHQௐWRௐDௐPRUHௐSURGXFWௐ DQGௐFXVWRPHUௐVHUYLFHௐDSSURDFKௐE\ௐLQVWLOOLQJௐDௐVHQVHௐRIௐFRQILGHQFHௐLQௐRXUௐFOLHQWVௐௐ7KHௐJRDOௐLVௐWRௐUHJXODUO\ௐ DVVLVWௐFOLHQWVௐDQGௐDGGUHVVௐDQ\ௐQHHGVௐDQGௐFRQFHUQVௐHYHQௐDIWHUௐWKHௐSXUFKDVHௐKDVௐRFFXUUHGௐௐ7KHௐVWULYHௐWRௐ IRFXVௐRQௐVROXWLRQௐVHOOLQJௐYVௐSURGXFWௐVHOOLQJௐGHYHORSVௐLQWRௐDௐPXWXDOO\ௐEHQHILFLDOௐDJUHHPHQWௐIRUௐPHPEHUVௐDQGௐ WKHௐEXVLQHVVௐௐ
%HORZௐDUHௐDௐIHZௐH[DPSOHVௐRQௐVXFFHVVIXOௐUHODWLRQVKLSௐPDUNHWLQJௐIURPௐRXUௐ)OHHWௐ'HSDUWPHQW ௐ
:HௐKDGௐDௐPHPEHUௐFDOOௐLQௐWRௐUHTXHVWௐILQDQFLQJOHDVHௐRSWLRQVௐIRUௐDௐWUXFNௐQHHGHGௐWKURXJKௐRXUௐ1DWLRQDOௐ$XWRௐ )OHHWௐ*URXS6RXUFHZHOOௐYHKLFOHௐFRQWUDFWௐௐ,ௐFRQWDFWHGௐDQRWKHUௐ6RXUFHZHOOௐYHQGRUௐ0DWWௐ*HLVHOKDUWௐIURPௐ1&/ௐ *RYௐ&DSLWDOௐDQGௐKHௐZDVௐKDSS\ௐWRௐDVVLVWௐZLWKௐDௐILQDQFLQJௐTXRWHௐௐ7KHௐPHPEHUௐDOVRௐUHTXHVWHGௐWRௐWUDGHௐLQௐDௐ FXUUHQWௐYHKLFOHௐLQௐWKHLUௐIOHHWௐDQGௐZDVௐGLUHFWHGௐWRௐ*RYGHDOVௐIRUௐDVVLVWDQFHௐLQௐUHPRYLQJௐWKHௐRXWGDWHGௐXQLWௐ WKURXJKௐDQௐDXFWLRQௐௐௐ7KHௐPHPEHUௐZDVௐDEOHௐWRௐXWLOL]HௐWKUHHௐ6RXUFHZHOOௐFRQWUDFWVௐWRௐFRPSOHWHௐKLVௐWUDQVDFWLRQௐ ZKLFKௐVLPSOLILHGௐWKHௐHQWLUHௐSURFHVVௐௐ7KHௐPHPEHUௐZDVௐYHU\ௐVDWLVILHGௐZLWKௐWKHௐDPRXQWௐRIௐFDUHௐDQGௐHDVHௐ WKURXJKௐKLVௐH[SHULHQFHௐDQGௐEHFDPHௐDௐUHSHDWௐFXVWRPHUௐௐௐ%\ௐXWLOL]LQJௐDௐFURVVVHOOLQJௐVWUDWHJ\ௐ1DWLRQDOௐ$XWRௐ )OHHWௐ*URXSௐEHFDPHௐKLVௐRQHௐVWRSௐVKRSௐWRௐIXOILOOௐDOOௐIOHHWௐYHKLFOHௐSXUFKDVLQJௐQHHGVௐ ³,ௐKDGௐDௐPHPEHUௐFDOOௐLQௐGHVSHUDWHௐWRௐREWDLQௐDௐQHZௐWUXFNௐEHFDXVHௐDQௐHPSOR\HHௐKDGௐJRWWHQௐLQWRௐDௐVHULRXVௐ DFFLGHQWௐDQGௐKDGௐWKHௐWUXFNௐWRWDOHGௐௐௐௐ'XHௐWRௐFRYLGௐUHVWULFWLRQVௐPRVWௐPDQXIDFWXUHUVௐDUHௐFXUUHQWO\ௐH[SHULHQFLQJௐ PLFURFKLSௐVKRUWDJHVௐZKLFKௐUHOD\VௐWRௐSURGXFWLRQௐGHOD\VௐDWௐWKHௐIDFWRU\ௐௐ:HௐZHUHௐDEOHௐWRௐGLUHFWௐEX\HUௐWRௐRXUௐLQ VWRFNௐLQYHQWRU\ௐRQௐWKHௐ1$)*ௐZHEVLWHௐDQGௐPHPEHUௐZDVௐHFVWDWLFௐWRௐORFDWHௐWUXFNௐWRௐPHHWௐWKHLUௐQHHGVௐௐௐ,QVWHDGௐ RIௐKDYLQJௐWRௐZDLWௐௐZHHNVௐWRௐUHFHLYHௐWKHௐQHZௐYHKLFOHௐPHPEHUௐZDVௐDEOHௐWRௐREWDLQௐWKHௐQHZௐWUXFNௐZLWKLQௐௐ ZHHNV´
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
³, RQFH KDG D PHPEHU FRQWDFW XV WZR \HDUV DIWHU SXUFKDVLQJ D YHKLFOH IURP XVௐௐௐ7KH\ KDG D PDOIXQFWLRQ ZLWKௐWKHௐOLIWJDWHௐRQௐWKHௐER[ௐWUXFNௐZKLFKௐFDXVHGௐDௐORJLVWLFDOௐQLJKWPDUHௐௐ,ௐZDVௐDEOHௐWRௐFRQWDFWௐRQHௐRIௐRXUௐERG\ௐ YHQGRUVௐWKDWௐXSILWWHGௐWKHௐOLIWௐJDWHௐLQVWDOODWLRQௐDQGௐDௐVHUYLFHௐWHFKQLFLDQௐZDVௐDEOHௐWRௐJRௐRQVLWHௐWRௐUHVROYHௐWKHௐ OLIWJDWHௐLVVXHௐDWௐQRௐDGGLWLRQDOௐFRVWௐௐ7KHௐPHPEHUௐZDVௐYHU\ௐLPSUHVVHGௐZLWKௐWKHௐTXDOLW\ௐRIௐRXUௐFXVWRPHUௐVHUYLFHௐ HYHQௐDIWHUௐSXUFKDVHௐ³
³,ௐKDGௐDௐPHPEHUௐUHTXHVWௐDௐôௐWRQௐWUXFNௐSULFLQJௐEXWௐZDVௐXQVXUHௐDERXWௐWKHLUௐEXGJHWௐDWௐWKHௐWLPHௐௐௐ,ௐWRRNௐWKHௐ WLPHௐWRௐJRௐWKURXJKௐHDFKௐRSWLRQௐZLWKௐWKHௐFOLHQWௐWRௐSURYLGHௐDௐ6RXUFHZHOOௐSULFLQJௐTXRWHௐWKURXJKௐPXOWLSOHௐ PDQXIDFWXUHUVௐIURPௐ5DPௐ&KHYUROHWௐDQGௐ)RUGௐௐ7KLVௐHPSRZHUHGௐWKHௐPHPEHUௐWRௐKDYHௐPXOWLSOHௐSULFLQJௐRSWLRQVௐ IRUௐUHYLHZௐWRௐDOLJQௐZLWKௐWKHLUௐEXGJHWௐDVௐZHOOௐDVௐHOLPLQDWLQJௐWKHௐQHHGௐWRௐVKRSௐDQ\ZKHUHௐHOVHௐ³ௐௐ ³:HௐZRUNௐZLWKௐPDQ\ௐERG\ௐFRPSDQLHVௐWRௐDVVLVWௐFXVWRPHUVௐZLWKௐWKHௐERG\ௐXSILWWLQJௐSURFHVVௐௐௐ2QHௐRIௐRXUௐ PHPEHUVௐFDOOHGௐLQௐDௐUHTXHVWௐWRௐH[SHGLWHௐDௐSDUWLFXODUௐYHKLFOHௐWKDWௐZDVௐKHOGௐXSௐDWௐRQHௐRIௐWKHLUௐORFDOௐERG\ௐ XSILWWHUVௐௐௐ,ௐFRQWDFWHGௐWKHௐERG\ௐFRPSDQ\ௐUHSUHVHQWDWLYHௐDQGௐSXWௐLQௐDௐUHTXHVWௐWRௐH[SHGLWHௐWKHௐXSILWWLQJௐSHUௐ UHTXHVWௐRIௐWKHௐPHPEHUௐௐ7KHௐERG\ௐFRPSDQ\ௐZDVௐDEOHௐWRௐFRPSO\ௐZLWKௐWKHௐUHTXHVWௐDQGௐGHOLYHU\ௐZDVௐPDGHௐ VRRQHUௐWKDQௐH[SHFWHG´
:RUGRI0RXWKௐ0DUNHWLQJ
ௐௐ7KHௐSRVLWLYHௐTXDOLW\ௐRIௐVHUYLFHௐKDVௐOHGௐWRௐPRUHௐVDOHVௐEDVHGௐRQௐSUHYLRXVௐ FXVWRPHUV¶ௐLPSUHVVLRQVௐRQௐWKHLUௐH[SHULHQFHௐௐ1$)*¶VௐJRDOௐLVௐWRௐSURYLGHௐH[HPSODU\ௐFXVWRPHUௐVHUYLFHௐ WKURXJKRXWௐWKHௐHQWLUHௐSXUFKDVLQJௐSURFHVVௐWRௐHQFRXUDJHௐUHSHDWௐEXVLQHVVௐDQGௐDGYRFDWHௐVHUYLFHVௐWRௐRWKHUௐ PHPEHUVௐௐ1$)*ௐKDVௐEHHQௐIRUWXQDWHௐWRௐH[SHULHQFHௐPXOWLSOHௐLQVWDQFHVௐRIௐOHDGVௐJHQHUDWHGௐEDVHGௐVROHO\ௐRQௐ ZRUGRIPRXWKௐPDUNHWLQJௐWKRXJKௐRXUௐH[LVWLQJௐFXVWRPHUVௐௐ &URVVSURPRWLRQ
ௐௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐLVௐFXUUHQWO\ௐFROODERUDWLQJௐZLWKௐDQRWKHUௐ6RXUFHZHOOௐ9HQGRUௐ1&/ௐ *RYHUQPHQWௐ&DSLWDOௐWRௐSURPRWHௐHDFKௐRWKHU¶VௐSURGXFWVௐDQGௐVHUYLFHVௐௐ1&/ௐ*RYHUQPHQWௐ&DSLWDOௐVSHFLDOL]HVௐLQௐ SURYLGLQJௐFRPSHWLWLYHௐHTXLSPHQWௐILQDQFLQJௐSURJUDPVௐIRUௐPXQLFLSDOLWLHVௐDQGௐSXEOLFௐHGXFDWLRQௐHQWLWLHVௐDFURVVௐWKHௐ 8QLWHGௐ6WDWHVௐௐ$VௐDௐWHDPௐ1&/ௐDQGௐ1$)*ௐSURGXFHGௐDௐYDULHW\ௐRIௐPDUNHWLQJௐPDWHULDOVௐVXFKௐDVௐYLGHRVௐIO\HUVௐ DQGௐLQIRௐJUDSKVௐWRௐSURPRWHௐSXUFKDVLQJௐDQGௐOHDVLQJௐRSSRUWXQLWLHVௐௐௐௐ +RJOXQGௐ%XVௐ&RPSDQ\ௐLVௐDQRWKHUௐFURVVSURPRWLRQௐYHQGRUௐ1$)*ௐKDGௐWKHௐRSSRUWXQLW\ௐWRௐFUHDWHௐDௐSDUWQHUVKLSௐ ZLWKௐௐௐ)O\HUVௐZHUHௐFUHDWHGௐWRௐDGYHUWLVHௐ&KDVVLVௐIURPௐ1$)*ௐDORQJௐZLWKௐDௐYDULHW\ௐRIௐEXVௐERGLHVௐIURPௐ+RJOXQGௐ %XVௐ&RPSDQ\ௐௐௐ
:LWKௐFURVVSURPRWLRQௐFRPSDQLHVௐH[FKDQJHௐNQRZOHGJHௐDQGௐSURYLGHௐHQGRUVHPHQWVௐRQௐZHEVLWHVௐVRFLDOௐPHGLDௐ DQGௐHPDLOௐFDPSDLJQVௐௐ7KLVௐVWUDWHJ\ௐFUHDWHVௐDQௐLQIOX[ௐRIௐQHZௐOHDGVௐEUDQGௐDZDUHQHVVௐLQFUHDVHGௐVDOHVௐDQGௐ UHFXUUHQFHௐRIௐFXVWRPHUVௐௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐZLOOௐFRQWLQXHௐWRௐFUHDWHௐQHZௐSDUWQHUVKLSVௐDQGௐIDFLOLWDWHௐ PRUHௐFURVVSURPRWLRQௐRSSRUWXQLWLHVௐLQௐWKHௐQHDUௐIXWXUHௐWRௐSURYLGHௐWXUQNH\ௐVROXWLRQVௐIRUௐDௐYDULHW\ௐRIௐYHKLFOHௐ SXUFKDVLQJௐQHHGVௐ
&RPLQJௐLQௐௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐZLOOௐEHௐODXQFKLQJௐDௐ1$)*ௐ3DUWQHUௐ:HEVLWHௐWRௐIXUWKHUௐLQFUHDVHௐ EXVLQHVVௐJURZWKௐௐ7KHௐZHEVLWHௐZZZQDIJSDUWQHUFRPௐLVௐH[SHFWHGௐWRௐODXQFKௐQH[Wௐ\HDUௐLQௐௐௐ7KHௐVLWHௐ HQFRXUDJHVௐERG\ௐXSILWWLQJௐFRPSDQLHVௐWKURXJKRXWௐWKHௐ8QLWHGௐ6WDWHVௐWRௐSDUWQHUௐXSௐZLWKௐ1$)*ௐWRௐEHFRPHௐDௐ SUHIHUUHGௐPHPEHUௐௐ7KHௐEHQHILWVௐRIௐEHFRPLQJௐDௐSUHIHUUHGௐPHPEHUௐLQFOXGHௐHQGRUVHPHQWVௐRQௐZHEVLWHௐDQGௐ VRFLDOௐPHGLDௐDYHQXHVௐDORQJௐZLWKௐZRUGRIPRXWKௐUHIHUUDOௐIRUௐFOLHQWVௐZLWKௐXSILWWLQJௐQHHGVௐௐ2XUௐGHGLFDWHGௐSXEOLFௐ UHODWLRQVௐUHSUHVHQWDWLYHௐZLOOௐFRQGXFWௐSKRQHௐDQGௐLQௐSHUVRQௐPHHWLQJVௐWRௐGLVFXVVௐWKHௐDGYDQWDJHVௐRIௐSDUWQHULQJௐXSௐ ZLWKௐ1$)*ௐWKHUHIRUHௐJHQHUDWLQJௐPRUHௐFURVVSURPRWLRQௐRSSRUWXQLWLHVௐ 0HPEHUVௐIURPௐJRYHUQPHQWௐDJHQFLHVௐDUHௐHQFRXUDJHGௐWRௐJRௐRQௐWKHௐVLWHௐWRௐVHDUFKௐIRUௐORFDOௐERG\ௐXSILWWLQJௐ FRPSDQLHVௐWKH\ௐDUHௐLQWHUHVWHGௐLQௐZRUNLQJௐZLWKௐௐௐ$VௐDௐSUHUHTXLVLWHௐLQௐEHFRPLQJௐDௐSUHIHUUHGௐYHQGRUௐWKH\ௐDUHௐ UHTXLUHGௐWRௐDGYHUWLVHௐ1$)*ௐDQGௐWKHௐ6RXUFHZHOOௐFRQWUDFWௐRQௐWKHLUௐEXVLQHVVௐZHEVLWHௐDQGௐUHIHUௐWKHLUௐFOLHQWVௐWRௐ SXUFKDVHௐWKHLUௐFDEFKDVVLVௐQHHGVௐWKURXJKௐ1$)*ௐௐ7KLVௐHVWDEOLVKHVௐDௐSDUWQHUVKLSௐWKDWௐZLOOௐJHQHUDWHௐLQFUHDVHGௐ VDOHVௐDOOௐDURXQGௐௐ:HௐDUHௐVWLOOௐFXUUHQWO\ௐEXLOGLQJௐWKHௐZHEVLWHௐDQGௐLQWHUDFWLQJௐZLWKௐERG\ௐFRPSDQLHVௐDFURVVௐWKHௐ 8QLWHGௐ6WDWHVௐWKDWௐZRXOGௐEHௐLQWHUHVWHGௐLQௐSDUWQHULQJௐXSௐZLWKௐ1$)* Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
'HVFULEHௐ\RXUௐXVHௐRIௐWHFKQRORJ\ௐDQGௐGLJLWDOௐ
GDWDௐ
HJௐVRFLDOௐPHGLDௐPHWDGDWDௐXVDJH
ௐWRௐ
HQKDQFHௐPDUNHWLQJௐHIIHFWLYHQHVV
6RFLDOௐPHGLDௐSOD\VௐDௐFUXFLDOௐHOHPHQWௐLQௐWKHௐZD\ௐSHRSOHௐFRPPXQLFDWHௐDQGௐFRQQHFWௐZLWKௐHDFKௐRWKHUௐௐௐௐ /LQNHG,QௐLVௐWKHௐJRWRௐSODWIRUPௐXVHGௐE\ௐ1$)*ௐDVௐLWௐRIIHUVௐDௐYDULHW\ௐRIௐZD\VௐWRௐH[SDQGௐRXUௐQHWZRUNௐE\ௐORFDWLQJௐ DQGௐFRQQHFWLQJௐZLWKௐUHOHYDQWௐSURIHVVLRQDOVௐLQௐWKHௐLQGXVWU\ௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐKDVௐXWLOL]HGௐ/LQNHG,QௐWRௐ HQJDJHௐFXUUHQWௐDQGௐSRWHQWLDOௐPHPEHUVௐWKURXJKௐSHUVRQDOL]HGௐPHVVDJHVௐDQGௐSRVWVௐௐ3HUVRQDOL]HGௐPHVVDJHVௐ LQFOXGHௐWKDQNLQJௐWKHPௐIRUௐUHJLVWHULQJௐRQௐVLWHௐDVௐZHOOௐDVௐGLUHFWLQJௐWKHPௐWRௐRQௐRXUௐOLQNௐWRௐWKHௐZHEVLWHௐ/LQNHG,Qௐ <RX7XEHௐ)DFHERRNௐDQGௐ,QVWDJUDPௐFRPSDQ\ௐSDJHVௐௐ7KHௐJRDOௐLVௐWRௐXQLWHௐZLWKௐSHRSOHௐDOUHDG\ௐRQௐRXUௐ GDWDEDVHௐDVௐZHOOௐDVௐSHRSOHௐWKDWௐZRXOGௐEHQHILWௐIURPௐRXUௐSURGXFWVௐDQGௐVHUYLFHVௐௐ&XUUHQWௐIO\HUVௐRUௐPHVVDJHVௐ DERXWௐRXUௐFRPSDQ\ௐDUHௐDOVRௐSRVWHGௐRQௐWKHௐ/LQNHG,QௐVLWHௐWRௐJHQHUDWHௐDQGௐDWWUDFWௐPRUHௐEXVLQHVVௐௐ7LPHௐLVௐ DOVRௐVSHQWௐRQௐUHDGLQJௐSRVWVௐIURPௐFRQQHFWLRQVௐDQGௐREVHUYHௐDQ\ௐQHHGVௐWKDWௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐPD\ௐ DVVLVWௐZLWKௐௐ
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐKDVௐEHJXQௐXWLOL]LQJௐYLGHRௐPDUNHWLQJௐVWUDWHJLHVௐWRௐIXUWKHUௐSURPRWHௐDQGௐPDUNHWௐ SURGXFWVௐE\ௐHQJDJLQJௐRQௐVRFLDOௐPHGLDௐFKDQQHOVௐDQGௐHPDLOௐIO\HUVௐௐ3URJUDPVௐVXFKௐDVௐ9LPHRௐ9LGHRௐ6FULEHௐ &DUWRRQௐ$QLPDWRUௐ$GREHௐ$QLPDWHௐ,OOXVWUDWHௐ&DSWLYHௐ3KRWRVKRSௐDQGௐ0RYDYLௐ9LGHRௐ(GLWRUௐ3OXVௐDUHௐHPSOR\HGௐ WRௐHGLWௐDQGௐFUHDWHௐYLGHRVௐWRௐDVVLVWௐLQௐHQGRUVLQJௐRXUௐFRPSDQ\ௐௐ7KHௐIROORZLQJௐYLGHRVௐZHUHௐUHFHQWO\ௐFUHDWHGௐE\ௐ RXUௐPDUNHWLQJௐGHSDUWPHQWௐDORQJௐZLWKௐRXWVLGHௐYLGHRௐSURGXFWLRQௐFRPSDQLHV
([SODLQHUௐ9LGHR
ௐௐ7KHௐILUVWௐYLGHRௐFUHDWHGௐZDVௐDௐ
ௐVHFRQGௐH[SODLQHUௐYLGHRௐDERXWௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐ WKDWௐXVHGௐDQLPDWHGௐFKDUDFWHUVௐWRௐYLVXDOL]HௐRXUௐSURGXFWVௐDQGௐVHUYLFHVௐDORQJௐZLWKௐLQIRUPDWLRQௐRQௐWKHௐ6RXUFHZHOOௐ DZDUGHGௐFRQWUDFWௐௐ7KHௐYLGHRௐKDVௐEHHQௐLQFRUSRUDWHGௐLQWRௐDOOௐRXUௐZHHNO\ௐHPDLOௐIO\HUVௐDQGௐVRFLDOௐPHGLDௐ SODWIRUPVௐDVௐDQௐLQIRUPDWLYHௐYLGHRௐRQௐRXUௐSURGXFWVௐDQGௐKRZௐWRௐSXUFKDVHௐYHKLFOHVௐRIIௐ6RXUFHZHOOௐ*RYHUQPHQWௐ &RQWUDFW
+RZௐ7Rௐ9LGHRV
ௐௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐKDVௐDOVRௐFUHDWHGௐVWHSE\VWHSௐ+RZ7RௐYLGHRVௐRQௐWKHௐSURFHVVௐWRௐ SXUFKDVHௐERWKௐ/LJKWௐ'XW\ௐDQGௐ+HDY\'XW\ௐYHKLFOHVௐRIIௐWKHௐFRQWUDFWௐௐ ,Qௐ6WRFNௐ9HKLFOHV
ௐௐ7KLVௐYLGHRௐVKRZFDVHVௐRXUௐLQVWRFNௐYHKLFOHVௐDYDLODEOHௐDQGௐWKHௐSURFHVVௐRIௐUHTXHVWLQJௐDௐ TXRWHௐ
(7$ௐ7UDFNLQJௐ6\VWHP
ௐௐ7KLVௐYLGHRௐZDVௐFUHDWHGௐWRௐQRWௐRQO\ௐLQWURGXFHௐEXWௐWRௐHQFRXUDJHௐFOLHQWVௐWRௐVHOIWUDFNௐ WKHLUௐYHKLFOHௐVWDWXVௐௐ
+ROLGD\ௐ7KHPHGௐ9LGHRV
ௐ7KHVHௐDPXVLQJௐYLGHRVௐZHUHௐFUHDWHGௐWRௐFHOHEUDWHௐWKHௐKROLGD\VௐDQGௐDGGௐKXPRUௐDQGௐ OLJKWQHVVௐWRௐRXUௐFRPSDQ\ௐDQGௐSURGXFWVௐVROGௐௐ
&URVVௐ3URPRWLRQௐ9LGHR
ௐௐ7KLVௐYLGHRௐPDUNHWVௐRXUௐUHODWLRQVKLSௐZLWKௐ1&/ௐ*RYHUQPHQWௐ&DSLWDOௐDQGௐ6RXUFHZHOOௐWRௐ HQGRUVHௐ(9ௐYHKLFOHVௐௐ
9LGHRVௐIRUௐVRFLDOௐPHGLD
ௐௐ0LQLௐYLGHRVௐZHUHௐFUHDWHGௐWRௐDGYHUWLVHௐQHZௐYHKLFOHVௐDYDLODEOHௐSULFLQJௐDQGௐFXWRIIௐ GDWHௐUHPLQGHUVௐௐ
1$)*ௐKDVௐUHFHQWO\ௐLQWURGXFHGௐDௐQHZO\ௐEXLOWௐOLYHௐFKDWௐIHDWXUHௐRQௐRXUௐZHEVLWHௐIRUௐFXVWRPHUௐFRQYHQLHQFHௐDVௐZHOOௐ DVௐLPSURYLQJௐFXVWRPHUௐVHUYLFHௐௐ9LVLWRUVௐKDYHௐDFFHVVௐWRௐFKDWௐZLWKௐDௐOLYHௐVDOHVௐUHSUHVHQWDWLYHௐௐKRXUVௐDௐGD\ௐ ௐGD\VௐDௐZHHNௐௐ:LWKௐWKLVௐIHDWXUHௐSRWHQWLDOௐFXVWRPHUVௐDUHௐSURYLGHGௐZLWKௐDQRWKHUௐDYHQXHௐIRUௐDVVLVWDQFHௐLQௐ DGGLWLRQௐWRௐHPDLOLQJௐDQGௐSKRQHௐFDOOVௐௐ7KHௐEHQHILWVௐRIௐDௐOLYHௐFKDWௐRSWLRQௐLQFOXGHௐTXLFNHUௐUHVSRQVHௐWLPHௐWRௐ DVVLVWௐEX\HUVௐLQௐUHDFKLQJௐDௐSXUFKDVLQJௐGHFLVLRQௐDQGௐDQVZHUௐWKHLUௐTXHVWLRQVௐ ,PSURYLQJௐFXVWRPHUௐVHUYLFHௐZLOOௐDOVRௐOHDGௐWRௐLQFUHDVHGௐVDOHVௐFXVWRPHUௐOR\DOW\ௐDQGௐHQJDJHPHQWௐௐ0DQ\ௐVWXGLHVௐ KDYHௐVKRZQௐDௐVWURQJௐFRUUHODWLRQௐEHWZHHQௐOLYHௐFKDWௐDQGௐLQFUHDVHௐLQௐFRQYHUVLRQௐUDWHVௐௐ3RWHQWLDOௐFOLHQWVௐ DSSUHFLDWHௐKDYLQJௐWKHLUௐTXHVWLRQVௐDQVZHUHGௐLQௐUHDOWLPHௐZKHQௐWU\LQJௐWRௐEXLOGௐDௐYHKLFOHௐTXRWHௐRQOLQHௐDQGௐ DOORZLQJௐWKHௐXVHUௐWRௐPXOWLWDVNௐGLIIHUHQWௐSURMHFWV
,Qௐ\RXUௐYLHZௐZKDWௐLVௐ6RXUFHZHOO¶VௐUROHௐLQௐ
SURPRWLQJௐFRQWUDFWVௐDULVLQJௐRXWௐRIௐWKLVௐ5)3"ௐ
+RZௐZLOOௐ\RXௐLQWHJUDWHௐDௐ6RXUFHZHOODZDUGHGௐ
FRQWUDFWௐLQWRௐ\RXUௐVDOHVௐSURFHVV"
6RXUFHZHOO¶VௐPLVVLRQௐVWDWHV
ௐ³2XUௐFRPPLWPHQWௐWRௐVHUYLFHௐDQGௐH[FHHGLQJௐFOLHQWௐH[SHFWDWLRQV´ௐௐ7KLVௐVWDWHPHQWௐ LQWHJUDWHVௐZLWKௐRXUௐUHODWLRQVKLSௐPDUNHWLQJௐVWUDWHJ\ௐZLWKௐRXUௐFRPPLWPHQWௐWRௐJRௐDERYHௐDQGௐEH\RQGௐIRUௐDOOௐRXUௐ PHPEHUVௐௐ6RXUFHZHOOௐLVௐDௐWUXVWHGௐEUDQGௐWKDWௐJRYHUQPHQWௐHQWLWLHVௐFDQௐUHO\ௐRQௐWRௐDFFHVVௐDௐZLGHௐYDULHW\ௐRIௐ SURGXFWVௐDQGௐVHUYLFHVௐIRUௐWKHLUௐHYHU\GD\ௐQHHGVௐௐ:LWKௐRYHUௐௐ\HDUVௐRIௐSDUWQHUVKLSVௐDQGௐUHODWLRQVKLSௐEXLOGLQJௐ WKH\ௐDUHௐWKHௐJOXHௐWKDWௐFRQQHFWVௐJRYHUQPHQWௐHGXFDWLRQௐDQGௐQRQSURILWௐDJHQFLHVௐWRௐFRPSDQLHVௐRIௐDOOௐVL]HVௐWRௐ RIIHUௐWXUQNH\ௐVROXWLRQVௐWRௐWKHLUௐQHHGVௐௐௐௐ
6RXUFHZHOOௐLVௐDOVRௐDௐUHOLDEOHௐUHVRXUFHௐIRUௐYHQGRUVௐE\ௐQRWௐRQO\ௐFRQQHFWLQJௐZLWKௐSRWHQWLDOௐSURVSHFWVௐEXWௐE\ௐ SURYLGLQJௐYDOXDEOHௐPDUNHWLQJௐPDWHULDOVௐUHDGLO\ௐDYDLODEOHௐIRUௐGRZQORDGௐRQௐWKHLUௐZHEVLWHௐௐ5HVRXUFHVௐDQGௐWRROVௐ SURYLGHGௐLQFOXGHௐIO\HUVௐYHQGRUௐWUDLQLQJௐYLGHRVௐDORQJௐZLWKௐFRPSOLDQFHௐLQIRUPDWLRQ 7KHௐ6RXUFHZHOOௐEUDQGௐLQWHJUDWHVௐDௐWKRURXJKௐGRFXPHQWDWLRQௐUHYLHZௐRIௐDOOௐYHQGRUVௐSULRUௐWRௐDZDUGLQJௐWKHLUௐ FRRSHUDWLYHௐFRQWUDFWVௐWRௐHQVXUHௐSURGXFWVௐDQGௐVHUYLFHVௐDUHௐIURPௐUHSXWDEOHௐYHQGRUVௐௐ7KHௐEUDQGௐSURYLGHVௐDௐ VHQVHௐRIௐOHJLWLPDF\ௐRIௐRXUௐFRPSDQ\ௐQDPHௐDQGௐPHPEHUVௐUHFRJQL]HௐWKDWௐSURGXFWVௐDQGௐVHUYLFHVௐDUHௐIURPௐ UHOLDEOHௐVRXUFHVௐWKDWௐZLOOௐPHHWௐWKHLUௐQHHGVௐௐ
6RXUFHZHOO¶VௐDLPௐLVௐWRௐVLPSOLI\ௐWKHௐSXUFKDVLQJௐDQGௐSURFXUHPHQWௐSURFHVVௐRIௐJRYHUQPHQWௐHQWLWLHVௐE\ௐHOLPLQDWLQJௐ WKHௐFRVWO\ௐELGGLQJௐSURFHGXUHௐௐ7KHௐSURFHVVௐRIௐUHVHDUFKLQJௐWKHௐULJKWௐYHQGRUௐLVௐQRWௐRQO\ௐVWUHVVIXOௐDQGௐWLPH FRQVXPLQJௐEXWௐFDQௐEHௐH[SHQVLYHௐDVௐZHOOௐௐ6RXUFHZHOOௐKDVௐFRPSOHWHGௐWKHௐELGGLQJௐIRUௐJRYHUQPHQWௐHQWLWLHVௐ ZKLFKௐVLPSOLILHVௐWKHௐRYHUDOOௐSXUFKDVLQJௐSURFHVVௐE\ௐSURYLGLQJௐDFFHVVௐWRௐFRPSHWLWLYHO\ௐELGௐFRQWUDFWVௐSURFXUHGௐE\ௐ DௐJRYHUQPHQWௐDJHQF\ௐௐ
6RXUFHZHOOௐKDVௐSURYLGHGௐ1$)*ௐZLWKௐRYHUZKHOPLQJௐRSSRUWXQLWLHVௐWRௐZRUNௐZLWKௐJRYHUQPHQWௐDJHQFLHVௐDFURVVௐWKHௐ 8QLWHGௐ6WDWHVௐௐ7KHௐ6RXUFHZHOOௐQDPHௐUHSUHVHQWVௐDௐKLJKௐVWDQGDUGௐRIௐLQWHJULW\ௐDQGௐHWKLFVௐZKLFKௐLVௐDௐG\QDPLFௐ 1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐLVௐSURXGௐWRௐEHௐSDUWௐRIௐௐ6RXUFHZHOOௐPHPEHUVௐKDYHௐDFFHVVௐWRௐDௐFRQWUDFWௐWKDWௐLVௐ PRUHௐIOH[LEOHௐWKDQௐWKHௐVWDQGDUGௐELGGLQJௐSURFHVVௐௐ6RXUFHZHOOௐLVௐDQௐRUJDQL]DWLRQௐWKDWௐDLGVௐJRYHUQPHQWௐHQWLWLHVௐ WRௐVWD\ௐFRPSHWLWLYHௐZLWKRXWௐWKHௐIUXVWUDWLRQVௐDQGௐLVVXHVௐLQYROYHGௐZLWKௐWKHௐWUDGLWLRQDOௐELGGLQJௐSURFHVVௐௐ7KLVௐ FRQWUDFWௐFDQௐEHௐFXVWRPL]HGௐWRௐPHHWௐWKHௐXQLTXHௐQHHGVௐRIௐHDFKௐFOLHQWௐௐ7KHௐVDOHVௐWHDPௐKDVௐLQFRUSRUDWHGௐQRWௐ RQO\ௐWKLVௐVWDQGDUGௐRIௐLQWHJULW\ௐLQௐWKHLUௐVDOHVௐSUDFWLFHௐHQVXULQJௐFOLHQWV¶ௐSXUFKDVLQJௐQHHGVௐZLOOௐDOZD\VௐEHௐPHWௐௐ 7KHௐFRVWௐVDYLQJVௐDQGௐVWUHVVIUHHௐQDWXUHௐRIௐWKHௐFRRSHUDWLYHௐFRQWUDFWVௐIDYRUVௐWKDWௐRIௐWKHௐWUDGLWLRQDOௐELGGLQJௐ SURFHVVௐௐ,WௐHQDEOHVௐYHQGRUVௐWRௐZRUNௐZLWKௐTXDOLI\LQJௐJRYHUQPHQWௐHQWLWLHVௐLQௐDௐPRUHௐHIILFLHQWௐPDQQHUௐௐ:HௐYRZௐ WRௐPDLQWDLQௐWKHVHௐOHYHOVௐRIௐVWDQGDUGVௐDFURVVௐWKHௐERDUGௐWKURXJKRXWௐDOOௐGHSDUWPHQWVௐZLWKLQௐWKHௐFRPSDQ\
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
$UHௐ\RXUௐSURGXFWVௐRUௐVHUYLFHVௐDYDLODEOHௐ
WKURXJKௐDQௐHSURFXUHPHQWௐRUGHULQJௐSURFHVV"ௐ,Iௐ
VRௐGHVFULEHௐ\RXUௐHSURFXUHPHQWௐV\VWHPௐDQGௐ
KRZௐJRYHUQPHQWDOௐDQGௐHGXFDWLRQDOௐFXVWRPHUVௐ
KDYHௐXVHGௐLW
2XUௐZHEVLWHௐSURYLGHVௐDௐKDQGVRQௐHPSRZHULQJௐDSSURDFKௐWRௐRUGHULQJௐYHKLFOHVௐRQOLQHௐௐ&OLHQWVௐFDQௐVHDUFKௐ WKURXJKௐPDQ\ௐYHKLFOHVௐPDNHVௐDQGௐPRGHOVௐZLWKௐWKHௐDELOLW\ௐWRௐFXVWRPL]HௐDௐYHKLFOHௐWDLORUHGௐWRௐWKHLUௐVSHFLILFௐ QHHGVௐRIௐWKHLUௐDJHQF\ௐௐௐ$ௐSHUVRQDOL]HGௐTXRWHௐZLWKௐSULFLQJௐFDQௐEHௐDYDLODEOHௐLQௐDVௐOLWWOHௐDVௐௐPLQXWHVௐ GHSHQGLQJௐRQௐWKHௐFRPSOH[LW\ௐRIௐWKHௐYHKLFOHௐௐௐ,IௐXSILWWLQJௐLVௐQHHGHGௐWKHௐEX\HUௐFDQௐOLVWௐWKHௐGHWDLOVௐRIௐWKHௐXSILWௐ ZKLOHௐEXLOGLQJௐWKHLUௐYHKLFOHௐRQௐRXUௐZHEVLWHௐWRௐUHFHLYHௐDௐFRPSOHWHௐTXRWHௐRUௐDௐVDOHVௐUHSUHVHQWDWLYHௐFDQௐEHௐ UHDFKHGௐWKURXJKௐSKRQHௐHPDLOௐRUௐRXUௐQHZௐOLYHௐFKDWௐIHDWXUHௐEXLOWௐRQௐRXUௐZHEVLWHௐௐ :HௐKDYHௐUHFHQWO\ௐFUHDWHGௐDQGௐXSORDGHGௐDௐ³+RZ7Rௐ9LGHRV´ௐVHFWLRQௐRQௐWKHௐKRPHSDJHௐRIௐRXUௐZHEVLWHௐZKLFKௐ KLJKOLJKWVௐDௐVWHSE\VWHSௐSURFHVVௐRQௐKRZௐWRௐEXLOGௐDQௐRQOLQHௐTXRWHௐௐ7KLVௐLQIRUPDWLYHௐYLGHRௐGHPRQVWUDWHVௐKRZௐ WRௐQDYLJDWHௐWKHௐZHEVLWHௐLQௐKRZௐWRௐJHQHUDWHௐDௐYHKLFOHௐTXRWHௐZLWKௐRUௐZLWKRXWௐXSILWWLQJௐRSWLRQVௐௐ,WௐEHJLQVௐE\ௐ H[SODLQLQJௐKRZௐWRௐUHJLVWHUௐRQௐRXUௐZHEVLWHௐDVௐDௐPHPEHUௐDQGௐWKHQௐGHWDLOVௐRQௐKRZௐWRௐVHOHFWௐYHKLFOHௐPRGHOௐDQGௐ W\SHௐDQGௐWKHௐIDFWRU\ௐRSWLRQVௐQHHGHGௐௐௐ
2QFHௐDௐFXVWRPL]HGௐTXRWHௐLVௐEXLOWௐFOLHQWVௐKDYHௐWKHௐRSWLRQௐWRௐILQDOL]HௐWKHௐVDOHVௐWUDQVDFWLRQௐE\ௐVXEPLWWLQJௐDௐ SXUFKDVHௐRUGHUௐWRௐRXUௐVDOHVௐWHDPௐYLDௐHPDLOௐௐ7KLVௐJLYHVௐFRPSOHWHௐDXWRQRP\ௐWRௐWKHௐFOLHQWௐWRௐSXUFKDVHௐYHKLFOHVௐ ZLWKRXWௐWKHௐQHHGௐWRௐVSHDNௐWRௐDௐVDOHVௐUHSௐௐ,IௐDVVLVWDQFHௐLVௐQHHGHGௐWKH\ௐFDQௐFRQWDFWௐVDOHVௐWKURXJKௐHPDLOௐOLYHௐ FKDWௐRUௐSKRQHௐௐ
,IௐDVVLVWDQFHௐLVௐUHTXLUHGௐWRௐEXLOGௐDௐTXRWHௐRXUௐVDOHVௐUHSௐLVௐDOVRௐDYDLODEOHௐWRௐZDONௐDௐFOLHQWௐWKURXJKௐWKHௐH SURFXUHPHQWௐSURFHVVௐVWHSௐE\ௐVWHSௐௐ7KLVௐHQVXUHVௐVRPHRQHௐLVௐDYDLODEOHௐWRௐDQVZHUௐDQ\ௐTXHVWLRQVௐLIௐQHHGHGௐ DQGௐHPSRZHULQJௐWKHௐFOLHQWௐWRௐPDNHௐDQ\ௐIXWXUHௐSXUFKDVHVௐRQௐWKHLUௐRZQௐௐ&OLHQWVௐPD\ௐDOVRௐFDOOௐRUௐHPDLOௐWKHௐ QHHGVௐRIௐWKHௐFRPSDQ\ௐDQGௐUHFHLYHௐDௐFXVWRPL]HGௐYHKLFOHௐTXRWH
7DEOH
9DOXH$GGHG$WWULEXWHV
/LQH,WHP 4XHVWLRQ 5HVSRQVH
'HVFULEHௐDQ\ௐSURGXFWௐHTXLSPHQWௐ
PDLQWHQDQFHௐRUௐRSHUDWRUௐWUDLQLQJௐ
SURJUDPVௐWKDWௐ\RXௐRIIHUௐWRௐ6RXUFHZHOOௐ
SDUWLFLSDWLQJௐHQWLWLHVௐ,QFOXGHௐGHWDLOVௐVXFKௐ
DVௐZKHWKHUௐWUDLQLQJௐLVௐVWDQGDUGௐRUௐ
RSWLRQDOௐZKRௐSURYLGHVௐWUDLQLQJௐDQGௐDQ\ௐ
FRVWVௐWKDWௐDSSO\
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐH[WHQGVௐDQ\ௐDQGௐDOOௐSURGXFWௐHTXLSPHQWௐPDLQWHQDQFHௐDQGௐRSHUDWLQJௐSURJUDPVௐ SURYLGHGௐE\ௐWKHௐ0DQXIDFWXUHUௐGLUHFWO\ௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐGXULQJௐWKHௐTXRWLQJௐSURFHVVௐ7KHௐ PDQXIDFWXUHUௐZLOOௐSURYLGHௐTXRWHVௐWRௐWKHௐPHPEHUௐEDVHGௐRQௐWKHௐYHKLFOHVௐFODVVௐDQGௐVL]HௐDQGௐJHRJUDSKLFௐORFDWLRQௐ 1$)*ௐZLOOௐDOZD\VௐSDVVௐWKHVHௐTXRWHVௐRQWRௐPHPEHUVௐDQGௐWUHDWௐWKHPௐOLNHௐDQௐXSILWௐWRௐWKHௐYHKLFOH
'HVFULEHௐDQ\ௐWHFKQRORJLFDOௐDGYDQFHVௐWKDWௐ
\RXUௐSURSRVHGௐSURGXFWVௐRUௐVHUYLFHVௐRIIHU
7HFKQRORJLFDOௐDFFRPSOLVKPHQWVௐE\ௐ0DQXIDFWXUHVௐOLNHௐ)RUGௐ0RWRUௐ&RPSDQ\ௐDQGௐ*HQHUDOௐ0RWRUVௐVHUYHௐPHPEHUVௐ E\ௐNHHSLQJௐPDQ\ௐPRGHOVௐDYDLODEOHௐIRUௐPHPEHUVௐWRௐFKRRVHௐIURPௐ$GGLWLRQDOO\ௐ1$)*ௐDOORZVௐPHPEHUVௐWKHௐDELOLW\ௐ WRௐFKRRVHௐWRௐHOHFWULI\ௐWKHLUௐYHKLFOHௐE\ௐRSWLQJௐLQWRௐWKHௐ0RWLYHௐ3RZHUௐ6\VWHPVௐZHௐFDQௐVWLOOௐKHOSௐVXSSO\ௐWKLVௐNLQGௐ RIௐDQௐXSILWௐ)RUௐPRUHௐLQIRUPDWLRQௐZHௐKDYHௐDWWDFKHGௐWKHௐSURGXFWௐDQGௐSULFLQJௐLQIRUPDWLRQௐZLWKLQௐWKHௐ³8SILWVௐ $YDLODEOH´ௐDQGௐ³$OOௐௐ0DQXIDFWXUHV´ௐ=,3ௐILOHVௐXQGHUௐWKHௐVXSSRUWLQJௐGRFXPHQWVௐSRUWLRQௐRIௐWKHௐDSSOLFDWLRQ
'HVFULEHௐDQ\ௐ³JUHHQ´ௐLQLWLDWLYHVௐWKDWௐUHODWHௐ
WRௐ\RXUௐFRPSDQ\ௐRUௐWRௐ\RXUௐSURGXFWVௐRUௐ
VHUYLFHVௐDQGௐLQFOXGHௐDௐOLVWௐRIௐWKHௐ
FHUWLI\LQJௐDJHQF\ௐIRUௐHDFK
ௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐKHOSHGௐFUHDWHௐWKHௐ&OLPDWHௐ0D\RUௐ3XUFKDVLQJௐ&ROODERUDWLYHௐE\ௐSDUWQHULQJௐZLWKௐRYHUௐ ௐ0D\RUVௐQDWLRQZLGHௐ7KLVௐLQLWLDWLYHௐZDVௐFUHDWHGௐIRUௐWKHௐEHQHILWௐRIௐPHPEHUVௐZKRௐZDQWHGௐWRௐFUHDWHௐDQGௐ VXVWDLQௐDQௐDOOHOHFWULFௐIOHHWௐ:HௐRIIHUௐௐSXUHO\ௐHOHFWULFௐYHKLFOHVௐ\RXUௐPHPEHUVௐWRௐFKRRVHௐIURPௐ6RPHௐSRSXODUௐ PRGHOVௐLQFOXGHௐWKHௐ&KHYUROHWௐ%ROWௐ)RUGௐ)XVLRQௐ)RUGௐ0XVWDQJௐ0DFK(ௐDVௐZHOOௐDVௐ)RUG¶VௐDOOௐHOHFWULFௐ)ௐ:Hௐ DUHௐFRQILGHQWௐWKDWௐDVௐPRUHௐ2(0¶VௐFRQWLQXHௐWRௐPDQXIDFWXUHௐQHZௐHOHFWULFௐYHKLFOHVௐZHௐZLOOௐSURYLGHௐWKHPௐIRUௐ PHPEHUVௐWRௐVHOHFWௐIURPௐ0RUHௐLQIRUPDWLRQௐDERXWௐWKLVௐLQLWLDWLYHௐFDQௐEHௐIRXQGௐDWௐZZZ'ULYHHYIOHHWRUJ
,GHQWLI\ௐDQ\ௐWKLUGSDUW\ௐLVVXHGௐHFRODEHOVௐ
UDWLQJVௐRUௐFHUWLILFDWLRQVௐWKDWௐ\RXUௐFRPSDQ\ௐ
KDVௐUHFHLYHGௐIRUௐWKHௐHTXLSPHQWௐRUௐ
SURGXFWVௐLQFOXGHGௐLQௐ\RXUௐ3URSRVDOௐUHODWHGௐ
WRௐHQHUJ\ௐHIILFLHQF\ௐRUௐFRQVHUYDWLRQௐOLIH
F\FOHௐGHVLJQௐ
FUDGOHWRFUDGOH
ௐRUௐRWKHUௐ
JUHHQVXVWDLQDELOLW\ௐIDFWRUV
1$)*ௐKDVௐWKHௐ&DOLIRUQLDௐ$LUௐ5HVRXUFHௐ%RDUGௐ
&$5%
ௐ&HUWLILFDWHௐDVௐZHOOௐDVௐWKHௐ)RUGௐ4XDOLILHGௐ9HKLFOHௐ0RGLILHUௐ &HUWLILFDWHௐRQௐILOHௐZLWKௐVRPHௐRIௐRXUௐSDUWQHUௐVXSSOLHUVௐDQGௐXSILWWHUVௐKROGௐWKHVHௐFHUWLILFDWLRQVௐDQGௐWKHVHௐ FHUWLILFDWLRQVௐKHOSௐLOOXVWUDWHௐKRZௐHDFKௐYHKLFOHௐFRQVHUYHVௐHQHUJ\ௐDQGௐUHPDLQVௐHQHUJ\ௐHIILFLHQW
'HVFULEHௐDQ\ௐ:RPHQௐRUௐ0LQRULW\ௐ
%XVLQHVVௐ(QWLW\ௐ
:0%(
ௐ6PDOOௐ%XVLQHVVௐ
(QWLW\ௐ
6%(
ௐRUௐYHWHUDQௐRZQHGௐEXVLQHVVௐ
FHUWLILFDWLRQVௐWKDWௐ\RXUௐFRPSDQ\ௐRUௐKXEௐ
SDUWQHUVௐKDYHௐREWDLQHGௐ8SORDGௐ
GRFXPHQWDWLRQௐRIௐFHUWLILFDWLRQௐ
DVௐ
DSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐXSORDGௐ
VHFWLRQௐRIௐ\RXUௐUHVSRQVH
1$)*ௐKROGVௐDௐFXUUHQWௐSDUWQHUVKLSௐZLWKௐPDQ\ௐVXSSOLHUVௐVRPHௐRIௐZKLFKௐDUHௐYHWHUDQௐRZHGௐVXFKௐDVௐ3DFLILFௐ7UXFNௐ %RG\ௐORFDWHGௐLQௐ&$ௐ2XUௐ)RUGௐ&KHYUROHWௐDQGௐ5DP-HHS'RGJH&KU\VOHUௐVWRUHVௐDUHௐMRLQWO\ௐRZQHGௐDQGௐRSHUDWHGௐ E\ௐ0LQRULWLHV
:KDWௐXQLTXHௐDWWULEXWHVௐGRHVௐ\RXUௐ
FRPSDQ\ௐ\RXUௐSURGXFWVௐRUௐ\RXUௐVHUYLFHVௐ
RIIHUௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHV"ௐ
:KDWௐPDNHVௐ\RXUௐSURSRVHGௐVROXWLRQVௐ
XQLTXHௐLQௐ\RXUௐLQGXVWU\ௐDVௐLWௐDSSOLHVௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHV"
ௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐZDVௐQRWௐRQO\ௐEXLOWௐRQௐGHGLFDWLRQௐDQGௐKDUGௐZRUNௐEXWௐDOVRௐWKURXJKௐTXDQWLILDEOHௐ PHWULFVௐWKDWௐGLUHFWO\ௐPHDVXUHௐWKHௐUHVXOWVௐRIௐRXUௐHIIRUWVௐWRௐHQVXUHௐUHDOௐJRDOVௐDUHௐEHLQJௐPHDVXUHGௐDQGௐPHWௐ 7KURXJKௐPHDVXULQJௐUHVXOWVௐ1$)*ௐWDNHVௐUHVSRQVLELOLW\ௐLQௐHQVXULQJௐZHௐGHOLYHUௐRQO\ௐWKHௐEHVWௐFXVWRPHUௐFDUHௐWRௐ \RXUௐPHPEHUVௐ1$)*ௐRIIHUVௐPHPEHUVௐௐKRXUௐZHEVLWHௐDFFHVVௐWRௐFXVWRPHUௐVXSSRUWௐWRௐSHUVRQDEO\ௐZDONௐ PHPEHUVௐWKURXJKௐDQ\ௐTXHVWLRQVௐWKH\ௐPD\ௐKDYHௐ1RௐPDWWHUௐZKDWௐWKHௐLVVXHௐPD\ௐEHௐZHௐDOZD\VௐWKLQNௐRXWVLGHௐWKHௐ ER[ௐWRௐKHOSௐPHPEHUVௐILQGௐDௐVROXWLRQ
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
7DEOH
$
:DUUDQW\
'HVFULEHLQGHWDLO\RXUPDQXIDFWXUHUZDUUDQW\SURJUDPLQFOXGLQJFRQGLWLRQVDQGUHTXLUHPHQWVWRTXDOLI\FODLPVSURFHGXUHDQGRYHUDOOVWUXFWXUH<RX PD\XSORDGUHSUHVHQWDWLYHVDPSOHVRI\RXUZDUUDQW\PDWHULDOV LIDSSOLFDEOH
LQWKHGRFXPHQWXSORDGVHFWLRQRI\RXUUHVSRQVHLQDGGLWLRQWR UHVSRQGLQJWRWKHTXHVWLRQVEHORZ
/LQH,WHP 4XHVWLRQ 5HVSRQVH
'Rௐ\RXUௐZDUUDQWLHVௐFRYHUௐDOOௐSURGXFWVௐSDUWVௐDQGௐODERU" (DFKௐRIௐWKHௐௐPDQXIDFWXUHVௐZHௐUHSUHVHQWௐFRYHUௐWKHLUௐRZQௐSURGXFWVௐSDUWVௐDQGௐODERUௐ$OOௐ ZDUUDQW\ௐLQIRUPDWLRQௐPD\ௐEHௐIRXQGௐLQௐRXUௐDWWDFKPHQWVௐXQGHUௐWKHௐ=,3ௐ)LOHௐ³$OOௐௐ 0DQXIDFWXUHV´
'Rௐ\RXUௐZDUUDQWLHVௐLPSRVHௐXVDJHௐUHVWULFWLRQVௐRUௐRWKHUௐ OLPLWDWLRQVௐWKDWௐDGYHUVHO\ௐDIIHFWௐFRYHUDJH"
3ULRUௐWRௐSXUFKDVHௐPHPEHUVௐVKRXOGௐEHௐDZDUHௐRIௐHDFKௐPDQXIDFWXUHU¶VௐUHVWULFWLRQVௐ6XFKௐDVௐ LPSURSHUௐXVHௐRIௐWKHௐYHKLFOHௐPD\ௐUHVXOWௐLQௐGLVTXDOLILFDWLRQௐRIௐFRYHUDJHௐXQGHUௐWKHௐ2(0¶Vௐ ZDUUDQW\ௐ$QௐH[DPSOHௐRIௐWKLVௐPD\ௐEHௐDQௐ)ௐEHLQJௐXVHGௐIRUௐDௐSROLFHௐUHODWHGௐSXUVXLWௐZKLFKௐ PD\ௐYRLGௐFHUWDLQௐZDUUDQWLHVௐ$OWKRXJKௐZHௐDOZD\VௐZHOFRPHௐDQGௐHQFRXUDJHௐPHPEHUVௐWRௐ FRQWDFWௐXVௐIRUௐWKHLUௐSDUWLFXODUௐZDUUDQW\ௐFRYHUDJH
'Rௐ\RXUௐZDUUDQWLHVௐFRYHUௐWKHௐH[SHQVHௐRIௐWHFKQLFLDQV¶ௐWUDYHOௐ WLPHௐDQGௐPLOHDJHௐWRௐSHUIRUPௐZDUUDQW\ௐUHSDLUV"
,QௐVRPHௐFDVHVௐPDQXIDFWXUHUVௐZLOOௐWRZௐDௐPHPEHU¶VௐYHKLFOHௐWRௐWKHௐQHDUHVWௐZDUUDQW\ௐUHSDLUௐ IDFLOLW\ௐLQௐFDVHௐRIௐDௐEUHDNGRZQௐDQGௐFRYHUௐH[SHQVHVௐEXWௐSULRUௐDSSURYDOௐLVௐUHTXLUHG
$UHௐWKHUHௐDQ\ௐJHRJUDSKLFௐUHJLRQVௐRIௐWKHௐ8QLWHGௐ6WDWHVௐRUௐ &DQDGDௐ
DVௐDSSOLFDEOH
ௐIRUௐZKLFKௐ\RXௐFDQQRWௐSURYLGHௐDௐ
FHUWLILHGௐWHFKQLFLDQௐWRௐSHUIRUPௐZDUUDQW\ௐUHSDLUV"ௐௐ+RZௐZLOOௐ 6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐWKHVHௐUHJLRQVௐEHௐSURYLGHGௐ VHUYLFHௐIRUௐZDUUDQW\ௐUHSDLU"
7KLVௐPD\ௐYDU\ௐIURPௐPDQXIDFWXUHUௐWRௐPDQXIDFWXUHUௐ7KXVௐZHௐHQFRXUDJHௐPHPEHUVௐWRௐFDOOௐLQௐ SULRUௐWRௐSXUFKDVHௐDQGௐLQTXLUHௐDERXWௐWKHLUௐVSHFLILFௐUHJLRQௐDQGௐKRZௐWKHLUௐZDUUDQW\ௐUHSDLUVௐZLOOௐ EHௐFRYHUHGௐZLWKௐWKHLUௐPDQXIDFWXUHU
:LOOௐ\RXௐFRYHUௐZDUUDQW\ௐVHUYLFHௐIRUௐLWHPVௐPDGHௐE\ௐRWKHUௐ PDQXIDFWXUHUVௐWKDWௐDUHௐSDUWௐRIௐ\RXUௐSURSRVDOௐRUௐDUHௐWKHVHௐ ZDUUDQWLHVௐLVVXHVௐW\SLFDOO\ௐSDVVHGௐRQௐWRௐWKHௐRULJLQDOௐ
HTXLSPHQWௐPDQXIDFWXUHU"
$OOௐZDUUDQWLHVௐDUHௐW\SLFDOO\ௐSDVVHGௐRQௐWRௐWKHௐRULJLQDOௐHTXLSPHQWௐPDQXIDFWXUHUௐDQGௐDQ\ௐXSILWௐ ZDUUDQW\ௐZLOOௐEHௐSDVVHGௐRQௐWRௐWKHௐXSILWWHUௐWRௐSHUIRUP
:KDWௐDUHௐ\RXUௐSURSRVHGௐH[FKDQJHௐDQGௐUHWXUQௐSURJUDPVௐDQGௐ SROLFLHV"
,IௐDௐPHPEHUௐFKDQJHVௐWKHLUௐPLQGௐ1$)*ௐZLOOௐTXLFNO\ௐPDNHௐHYHU\ௐHIIRUWௐWRௐFKDQJHௐRUௐFDQFHOௐ WKHௐRUGHUௐZLWKௐWKHௐIDFWRU\ௐ+RZHYHUௐRQFHௐWKHௐPDQXIDFWXUHUௐEHJLQVௐSURGXFLQJௐWKHௐYHKLFOHௐWKHUHௐ DUHௐQRௐFKDQJHVௐH[FKDQJHVௐRUௐUHIXQGVௐDYDLODEOHௐ7KHௐRUGHUௐLVௐWKHQௐGHHPHGௐQRQFDQFHOODEOHௐ 7KLVௐLQFOXGHVௐDQ\ௐXSILWௐHTXLSPHQWௐDQௐXSILWWHUௐKDVௐRUGHUHGௐIRUௐWKHௐXQLW
'HVFULEHௐDQ\ௐVHUYLFHௐFRQWUDFWௐRSWLRQVௐIRUௐWKHௐLWHPVௐLQFOXGHGௐ LQௐ\RXUௐSURSRVDO
1$)*ௐRIIHUVௐDQ\ௐDQGௐDOOௐPDQXIDFWXUHUௐVHUYLFHௐFRQWUDFWVௐIRUௐDOOௐPHPEHUVௐ7KHUHௐDUHௐVHYHUDOௐ SDUDPHWHUVௐLQௐZKLFKௐDௐVHUYLFHௐFRQWUDFWௐPD\ௐEHௐFXVWRPL]DEOHௐ7KHVHௐFXVWRPL]HGௐVHUYLFHௐ FRQWUDFWVௐZLOOௐEHௐWUHDWHGௐDVௐDGGௐIDFWRU\ௐRSWLRQVௐDQGௐIROORZLQJௐWKHௐVDPHௐGLVFRXQWௐVFKHGXOHௐ SURYLGHGௐLQௐWKHௐSULFLQJௐILOH
7DEOH
%
3HUIRUPDQFH6WDQGDUGVRU*XDUDQWHHV
'HVFULEHLQGHWDLO\RXUSHUIRUPDQFHVWDQGDUGVRUJXDUDQWHHVLQFOXGLQJFRQGLWLRQVDQGUHTXLUHPHQWVWRTXDOLI\FODLPVSURFHGXUHDQGRYHUDOOVWUXFWXUH<RXPD\ XSORDGUHSUHVHQWDWLYHVDPSOHVRI\RXUSHUIRUPDQFHPDWHULDOV LIDSSOLFDEOH
LQWKHGRFXPHQWXSORDGVHFWLRQRI\RXUUHVSRQVHLQDGGLWLRQWRUHVSRQGLQJWRWKH TXHVWLRQVEHORZ
/LQH
,WHP 4XHVWLRQ 5HVSRQVH
'HVFULEHௐDQ\ௐSHUIRUPDQFHௐVWDQGDUGVௐRUௐJXDUDQWHHVௐ
WKDWௐDSSO\ௐWRௐ\RXUௐVHUYLFHV
7KHௐRQO\ௐJXDUDQWHHௐZHௐFDQௐHYHUௐSURYLGHௐLVௐWKHௐJXDUDQWHHௐWKDWௐZHௐZLOOௐWUHDWௐDQGௐKHOSௐHYHU\ௐPHPEHUௐ WKDWௐFRQWDFWVௐZLWKௐUHVSHFWௐLQWHJULW\ௐDQGௐSURIHVVLRQDOLVP
'HVFULEHௐDQ\ௐVHUYLFHௐVWDQGDUGVௐRUௐJXDUDQWHHVௐWKDWௐ
DSSO\ௐWRௐ\RXUௐVHUYLFHVௐ
SROLFLHVௐPHWULFVௐ.3,VௐHWF
1$)*ௐDQGௐVWDIIௐXSKROGௐKLJKௐVWDQGDUGVௐZLWKௐKRZௐZHௐSURYLGHௐVHUYLFHௐWRௐWKHௐPHPEHUVௐQRWௐRQO\ௐKROGLQJௐ HDFKௐRWKHUௐDFFRXQWDEOHௐEXWௐE\ௐHPEUDFLQJௐPHPEHUௐIHHGEDFNௐRIௐKRZௐZHௐFDQௐLPSURYHௐ7KHQௐZHௐDFWௐ XSRQௐLWௐDQGௐLPSOHPHQWௐLPSURYHPHQWV
7DEOH
3D\PHQW7HUPVDQG)LQDQFLQJ2SWLRQV
/LQH
,WHP 4XHVWLRQ 5HVSRQVH
'HVFULEHௐ\RXUௐSD\PHQWௐWHUPVௐDQGௐDFFHSWHGௐSD\PHQWௐ
PHWKRGV"
6WDQGDUGௐSD\PHQWௐWHUPVௐDUHௐ1HWௐௐZLWKௐDௐௐ±ௐGD\ௐJUDFHௐSHULRG
'HVFULEHௐDQ\ௐOHDVLQJௐRUௐILQDQFLQJௐRSWLRQVௐDYDLODEOHௐIRUௐ XVHௐE\ௐHGXFDWLRQDOௐRUௐJRYHUQPHQWDOௐHQWLWLHV
ௐ,QௐRUGHUௐWRௐSURYLGHௐOHDVLQJௐRUௐILQDQFLQJௐRSWLRQVௐ1$)*ௐKDVௐSDUWQHUHGௐZLWKௐ1DWLRQDOௐ&RRSHUDWLYHௐ/HDVLQJௐWRௐ RIIHUௐOHDVLQJௐWHUPVௐIRUௐ6RXUFHZHOOௐPHPEHUVௐIRUௐDOOௐ1$)*ௐTXRWHVௐXQGHUௐWKHௐ6RXUFHZHOOௐFRQWUDFWௐ)RUௐIXUWKHUௐ UHYLHZௐZHௐKDYHௐDWWDFKHGௐDௐ3')ௐFDOOHGௐ³1&/ௐ6DPSOHௐ/HDVH´ௐLQௐWKHௐ³0HPEHUௐ:DONௐ7KURXJK´ௐ=LSௐILOH
'HVFULEHௐDQ\ௐVWDQGDUGௐWUDQVDFWLRQௐGRFXPHQWVௐWKDWௐ\RXௐ SURSRVHௐWRௐXVHௐLQௐFRQQHFWLRQௐZLWKௐDQௐDZDUGHGௐFRQWUDFWௐ
RUGHUௐIRUPVௐWHUPVௐDQGௐFRQGLWLRQVௐVHUYLFHௐOHYHOௐ
DJUHHPHQWVௐHWF
ௐ8SORDGௐDௐVDPSOHௐRIௐHDFKௐ
DVௐ
DSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐ
UHVSRQVH
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXS¶VௐWUDQVDFWLRQௐSURFHVVௐ
3XUFKDVHௐ2UGHU
ௐLVௐFORVHO\ௐWUDFNHGௐZHOOௐGRFXPHQWHGௐDQGௐ
QHDWO\ௐRUJDQL]HGௐWRௐPRQLWRUௐHDFKௐWUDQVDFWLRQௐSHUIRUPHGௐWKURXJKௐRXUௐ6RXUFHZHOOௐ&RQWUDFWௐ7KLVௐZD\ௐ1$)*ௐPD\ௐ SURGXFHௐVZLIWௐDQGௐDFFXUDWHௐTXDUWHUO\ௐUHSRUWLQJ
'Rௐ\RXௐDFFHSWௐWKHௐ3FDUGௐSURFXUHPHQWௐDQGௐSD\PHQWௐ
SURFHVV"ௐ,IௐVRௐLVௐWKHUHௐDQ\ௐDGGLWLRQDOௐFRVWௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐIRUௐXVLQJௐWKLVௐSURFHVV" <HVௐ1$)*ௐDFFHSWVௐXSௐWRௐௐSHUௐYHKLFOHௐ+RZHYHUௐDQ\ௐGROODUௐDPRXQWௐKLJKHUௐWKDQௐௐZLOOௐUHTXLUHௐDௐ3 FDUGௐ&UHGLWௐ&DUGௐWUDQVDFWLRQDOௐIHHௐWKDWௐZRXOGௐEHௐSDVVHGௐRQWRௐWKHௐPHPEHU
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
7DEOH
3ULFLQJDQG'HOLYHU\
3URYLGHGHWDLOHGSULFLQJLQIRUPDWLRQLQWKHTXHVWLRQVWKDWIROORZEHORZ.HHSLQPLQGWKDWUHDVRQDEOHSULFHDQGSURGXFWDGMXVWPHQWVFDQEHPDGHGXULQJWKHWHUPRI DQDZDUGHG&RQWUDFWDVGHVFULEHGLQWKH5)3WKHWHPSODWH&RQWUDFWDQGWKH6RXUFHZHOO3ULFHDQG3URGXFW&KDQJH5HTXHVW)RUP /LQH
,WHP 4XHVWLRQ 5HVSRQVH
'HVFULEHௐ\RXUௐSULFLQJௐPRGHOௐ
HJௐOLQHLWHPௐGLVFRXQWVௐRUௐSURGXFWFDWHJRU\ௐ
GLVFRXQWV
ௐ3URYLGHௐGHWDLOHGௐSULFLQJௐGDWDௐ
LQFOXGLQJௐVWDQGDUGௐRUௐOLVWௐ
SULFLQJௐDQGௐWKHௐ6RXUFHZHOOௐGLVFRXQWHGௐSULFH
ௐRQௐDOOௐRIௐWKHௐLWHPVௐWKDWௐ\RXௐ
ZDQWௐ6RXUFHZHOOௐWRௐFRQVLGHUௐDVௐSDUWௐRIௐ\RXUௐ5)3ௐUHVSRQVHௐ,IௐDSSOLFDEOHௐ SURYLGHௐDௐ6.8ௐIRUௐHDFKௐLWHPௐLQௐ\RXUௐSURSRVDOௐ8SORDGௐ\RXUௐSULFLQJௐ PDWHULDOVௐ
LIௐDSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐLVௐRIIHULQJௐ/LQH,WHPௐ'LVFRXQWVௐ2IIௐ0DQXIDFWXUHௐ 6XJJHVWHGௐ5HWDLOௐ3ULFHௐIRUௐௐPDQXIDFWXUHUVௐWKDWௐLVௐGHWDLOHGௐLQௐWKHௐ3ULFHௐ)LOHௐ 1$)*ௐZLOOௐDOVRௐRIIHUௐDQ\ௐ8SILWVௐWRௐEHௐDGGHGௐWRௐDQ\ௐDQGௐDOOௐYHKLFOHV¶ௐWKDWௐPHPEHUVௐ ZLVKௐWRௐDGGௐ'HWDLOVௐDUHௐORFDWHGௐRQௐWKHௐ3ULFHௐ6XPPDU\ௐ3DJHௐLQௐWKHௐ3ULFHௐ)LOH
4XDQWLI\ௐWKHௐSULFLQJௐGLVFRXQWௐUHSUHVHQWHGௐE\ௐWKHௐSULFLQJௐSURSRVDOௐLQௐWKLVௐ UHVSRQVHௐ)RUௐH[DPSOHௐLIௐWKHௐSULFLQJௐLQௐ\RXUௐUHVSRQVHௐUHSUHVHQWVௐDௐ SHUFHQWDJHௐGLVFRXQWௐIURPௐ0653ௐRUௐOLVWௐVWDWHௐWKHௐSHUFHQWDJHௐRUௐ SHUFHQWDJHௐUDQJH
1$)*ௐKDVௐDQௐSURYLGHGௐRIIHULQJVௐIURPௐௐ%UDQGV2(06ௐDQGௐWKHUHௐUHVSHFWLYHௐ SHUFHQWDJHௐRIIௐYDU\ௐDQGௐDUHௐGHWDLOHGௐLQௐWKHௐ3ULFHௐ)LOHௐ]LSௐ (DFKௐ0DQXIDFWXUHௐ5DQJHௐLVௐGHWDLOHGௐLQௐWKHௐWDEVௐEHORZௐKHUHௐLVௐDQௐ RYHUYLHZௐௐௐௐௐௐௐௐௐௐௐௐ
&KHYUROHWௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
)RUGௐ0RWRUௐ&RPSDQ\ௐIURPௐ
ௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
*0&ௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
5DPௐIURPௐ
ௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
'RGJHௐIURPௐ
ௐWRௐ
ௐௐௐௐௐௐௐௐௐௐௐௐௐ
-HHSௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
&KU\VOHUௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
7R\RWDௐIURPௐௐWRௐ
ௐௐௐௐௐௐௐௐௐௐௐௐௐ
+RQGDௐIURPௐௐWRௐ
ௐௐௐௐௐௐௐௐௐௐௐௐௐ
1LVVDQௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
%XLFNௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐ
.LDௐIURPௐ
ௐWRௐ
ௐௐௐௐௐௐௐௐௐௐௐௐௐ
%0:ௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
&DGLOODFௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐௐ
9RONVZDJHQௐIURPௐௐWRௐௐ
'HVFULEHௐDQ\ௐTXDQWLW\ௐRUௐYROXPHௐGLVFRXQWVௐRUௐUHEDWHௐSURJUDPVௐWKDWௐ\RXௐ RIIHU
,IௐFOLHQWVௐDUHௐFRQVLGHULQJௐDQௐRUGHUௐRIௐௐRUௐPRUHௐXQLWVௐZHௐHQFRXUDJHௐPHPEHUVௐ WRௐFRQWDFWௐXVௐIRUௐDQ\ௐDGGLWLRQDOௐGLVFRXQWHGௐTXRWHV
3URSRVHௐDௐPHWKRGௐRIௐIDFLOLWDWLQJௐ³VRXUFHG´ௐSURGXFWVௐRUௐUHODWHGௐVHUYLFHVௐ ZKLFKௐPD\ௐEHௐUHIHUUHGௐWRௐDVௐ³RSHQௐPDUNHW´ௐLWHPVௐRUௐ³QRQVWDQGDUG RSWLRQV´ௐ)RUௐH[DPSOHௐ\RXௐPD\ௐVXSSO\ௐVXFKௐLWHPVௐ³DWௐFRVW´ௐRUௐ³DWௐFRVWௐ SOXVௐDௐSHUFHQWDJH´ௐRUௐ\RXௐPD\ௐVXSSO\ௐDௐTXRWHௐIRUௐHDFKௐVXFKௐUHTXHVW ³2SHQௐ0DUNHW´ௐSURGXFWVௐRUௐ³6RXUFHGௐ*RRGV´ௐZLOOௐEHௐFRQVLGHUHGௐDQGௐWUHDWHGௐDVௐ UHJXODUௐXSILWVௐ+RZHYHUௐWKH\ௐPD\ௐEHௐTXRWHGௐXSௐWRௐDௐௐPDUNௐXSௐLIௐDSSOLFDEOH
,GHQWLI\ௐDQ\ௐHOHPHQWௐRIௐWKHௐWRWDOௐFRVWௐRIௐDFTXLVLWLRQௐWKDWௐLVௐ127ௐLQFOXGHGௐ LQௐWKHௐSULFLQJௐVXEPLWWHGௐZLWKௐ\RXUௐUHVSRQVHௐ7KLVௐLQFOXGHVௐDOOௐDGGLWLRQDOௐ FKDUJHVௐDVVRFLDWHGௐZLWKௐDௐSXUFKDVHௐWKDWௐDUHௐQRWௐGLUHFWO\ௐLGHQWLILHGௐDVௐ IUHLJKWௐRUௐVKLSSLQJௐFKDUJHVௐ)RUௐH[DPSOHௐOLVWௐFRVWVௐIRUௐLWHPVௐOLNHௐSUH GHOLYHU\ௐLQVSHFWLRQௐLQVWDOODWLRQௐVHWௐXSௐPDQGDWRU\ௐWUDLQLQJௐRUௐLQLWLDOௐ LQVSHFWLRQௐ,GHQWLI\ௐDQ\ௐSDUWLHVௐWKDWௐLPSRVHௐVXFKௐFRVWVௐDQGௐWKHLUௐ UHODWLRQVKLSௐWRௐWKHௐ3URSRVHU
$OOௐFRQVLGHUDWLRQVௐKDYHௐDOUHDG\ௐEHHQௐWDNHQௐLQWRௐDFFRXQWௐLQௐLWVௐHQWLUHO\ௐ7KHௐ3ULFHௐ 6XPPDU\ௐ3DJHௐDQGௐ3ULFHௐ7DEOHௐFRQWDLQHGௐLQௐWKHௐSULFHௐILOHௐLQFOXGHVௐDOOௐFRQVLGHUHGௐ FRVWVௐ$OWKRXJKௐLIௐDௐPHPEHUௐUHTXHVWHGௐDௐVSHFLDOL]HGௐTXRWHௐIRUௐDௐXQLTXHௐVLWXDWLRQௐ WKDWௐUHTXLUHVௐVSHFLDOௐWUDLQLQJௐGLUHFWLRQௐRUௐLQVWDOODWLRQௐWKHௐDGGLWLRQDOௐFRVWVௐZRXOGௐEHௐ DGGHGௐDVௐDௐSDUWௐRIௐWKHௐXSILWௐDQGௐWKHQௐLQFOXGHGௐLQVLGHௐWKHௐPHPEHU¶VௐTXRWH
,IௐIUHLJKWௐGHOLYHU\ௐRUௐVKLSSLQJௐLVௐDQௐDGGLWLRQDOௐFRVWௐWRௐWKHௐ6RXUFHZHOOௐ SDUWLFLSDWLQJௐHQWLW\ௐGHVFULEHௐLQௐGHWDLOௐWKHௐFRPSOHWHௐIUHLJKWௐVKLSSLQJௐDQGௐ GHOLYHU\ௐSURJUDP
$OOௐPDQXIDFWXUHVௐFKDUJHௐDௐVWDQGDUGௐ³)DFWRU\ௐ'HVWLQDWLRQௐ&KDUJH´ௐ+RZHYHUௐWKDWௐLVௐ VHSDUDWHௐIURPௐWKHௐIUHLJKWGHVWLQDWLRQௐFRVWௐWKDWௐPHPEHUVௐPD\ௐLQFXUௐWRௐVKLSௐDௐYHKLFOHௐ WRௐDQGௐIURPௐDQௐLQVWDOOHUௐLIௐDSSOLFDEOHௐ7KHVHௐVXEVHTXHQWௐORFDWLRQDOௐPRYHPHQWVௐPD\ௐ EDUHௐDGGLWLRQDOௐIUHLJKWௐFRVWVௐWKDWௐZLOOௐEHௐRXWOLQHGௐZLWKLQௐWKHௐPHPEHUVௐTXRWHௐIRUௐ WKHLUௐUHYLHZௐSULRUௐWRௐSXUFKDVH
6SHFLILFDOO\ௐGHVFULEHௐIUHLJKWௐVKLSSLQJௐDQGௐGHOLYHU\ௐWHUPVௐRUௐSURJUDPVௐ DYDLODEOHௐIRUௐ$ODVNDௐ+DZDLLௐ&DQDGDௐRUௐDQ\ௐRIIVKRUHௐGHOLYHU\ )UHLJKWௐVKLSSLQJௐDQGௐGHOLYHU\ௐWHUPVௐDPRQJௐWKHVHௐUHJLRQVௐVRPHWLPHVௐFDUU\ௐ DGGLWLRQDOௐORJLVWLFDOௐFKDUJHVௐIRUௐDGGHGௐIHUU\ௐSRUWௐDQGௐGULYHUௐFRVWVௐIURPௐERWKௐWRௐDQGௐ IURPௐWKHௐPDLQODQGௐ7KHVHௐDGGHGௐFRVWVௐZLOOௐEHௐGLVFORVHGௐRQௐWKHௐTXRWHௐIRUௐ PHPEHUVௐWRௐUHYLHZௐDQGௐDSSURYHௐSULRUௐWRௐSXUFKDVH
'HVFULEHௐDQ\ௐXQLTXHௐGLVWULEXWLRQௐDQGRUௐGHOLYHU\ௐPHWKRGVௐRUௐRSWLRQVௐ RIIHUHGௐLQௐ\RXUௐSURSRVDO
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐDOUHDG\ௐKDVௐDௐZHOOHVWDEOLVKHGௐ$XWRPRELOHௐ)UDQFKLVHௐ 'LVWULEXWLRQௐ1HWZRUNௐWKDWௐDOORZVௐIRUௐVZLIWௐDQGௐUHODWLYHO\ௐVHDPOHVVௐGHOLYHU\ௐWRௐ PHPEHUVௐDQGௐWKHLUௐHQGௐXVHUV
7DEOH
3ULFLQJ2IIHUHG
/LQH
,WHP 7KH3ULFLQJ2IIHUHGLQWKLV3URSRVDOLV
&RPPHQWV
FEHWWHUWKDQWKH3URSRVHUW\SLFDOO\RIIHUVWR*32VFRRSHUDWLYHSURFXUHPHQWRUJDQL]DWLRQVRUVWDWHSXUFKDVLQJGHSDUWPHQWV 1$)*ௐ6WULYHVௐWRௐRIIHUௐWKHௐEHVWௐ RYHUDOOௐYDOXHௐWRௐWKHௐPHPEHUௐZLWKௐ
HDFKௐDQGௐHYHU\ௐTXRWH
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
7DEOH
$XGLWDQG$GPLQLVWUDWLYH)HH
/LQH
,WHP 4XHVWLRQ 5HVSRQVH
6SHFLILFDOO\ௐGHVFULEHௐDQ\ௐVHOIDXGLWௐSURFHVVௐRUௐSURJUDPௐWKDWௐ\RXௐSODQௐWRௐHPSOR\ௐ WRௐYHULI\ௐFRPSOLDQFHௐZLWKௐ\RXUௐSURSRVHGௐ&RQWUDFWௐZLWKௐ6RXUFHZHOOௐ7KLVௐSURFHVVௐ LQFOXGHVௐHQVXULQJௐWKDWௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐREWDLQௐWKHௐSURSHUௐSULFLQJௐ WKDWௐWKHௐ9HQGRUௐUHSRUWVௐDOOௐVDOHVௐXQGHUௐWKHௐ&RQWUDFWௐHDFKௐTXDUWHUௐDQGௐWKDWௐWKHௐ 9HQGRUௐUHPLWVௐWKHௐSURSHUௐDGPLQLVWUDWLYHௐIHHௐWRௐ6RXUFHZHOOௐ3URYLGHௐVXIILFLHQWௐGHWDLOௐ WRௐVXSSRUWௐ\RXUௐDELOLW\ௐWRௐUHSRUWௐTXDUWHUO\ௐVDOHVௐWRௐ6RXUFHZHOOௐDVௐGHVFULEHGௐLQௐWKHௐ &RQWUDFWௐWHPSODWH
6RXUFHZHOOௐSDUWLFLSDWLQJௐPHPEHUVௐDUHௐDEOHௐWRௐREWDLQௐSURSHUௐSULFLQJௐGLUHFWO\ௐ IURPௐRXUௐZHEVLWHௐZKHUHௐWKH\ௐDUHௐDEOHௐWRௐXVHௐRXUௐXVHUIULHQGO\ௐGHVLJQௐWRௐ EXLOGௐDQGௐSULFHௐWKHLUௐYHKLFOHVௐ7KHௐ1$)*ௐLVௐXSGDWHGௐGDLO\ௐWRௐUHIOHFWௐ XSGDWHGௐPDQXIDFWXUHUௐ0653ௐLQIRUPDWLRQௐ2XUௐV\VWHPௐZLOOௐSURYLGHௐPHPEHUVௐ ZLWKௐDQௐDFFXUDWHௐTXRWHௐ
ௐRIௐWKHௐWLPHௐ,QௐDGGLWLRQௐ1$)*ௐKDVௐDௐ
VWUHDPௐOLQHௐDQGௐRUJDQL]HGௐSURFHVVௐKDWௐFDOFXODWHVௐDGPLQLVWUDWLYHௐIHHVௐDQGௐ DOORZVௐ1$)*ௐWRௐJLYHௐDௐWXUQDURXQGௐWLPHௐRIௐௐ±ௐௐGD\VௐIRUௐTXDUWHUO\ௐ UHSRUWV
,Iௐ\RXௐDUHௐDZDUGHGௐDௐFRQWUDFWௐSURYLGHௐDௐIHZௐH[DPSOHVௐRIௐLQWHUQDOௐPHWULFVௐWKDWௐ ZLOOௐEHௐWUDFNHGௐWRௐPHDVXUHௐZKHWKHUௐ\RXௐDUHௐKDYLQJௐVXFFHVVௐZLWKௐWKHௐFRQWUDFW 2QHௐRIௐWKHௐLQWHUQDOௐPHWULFVௐ1$)*ௐXVHVௐWRௐWUDFNௐDQGௐPHDVXUHௐVXFFHVVௐ ZLWKௐWKHௐ6RXUFHZHOOௐ&RQWUDFWௐLVௐPDLQWDLQHGௐWKURXJKௐRXUௐZHEVLWHௐ2XUௐ ZHEVLWHௐNHHSVௐDௐGHWDLOHGௐORJௐRIௐTXRWHVௐWKDWௐPHPEHUVௐDUHௐJHQHUDWLQJௐ:Hௐ RYHUVHHௐDQGௐNHHSௐWUDFNௐRIௐKRZௐPDQ\ௐTXRWHVௐDUHௐEHLQJௐJHQHUDWHGௐDQGௐ ZKLFKௐTXRWHVௐDUHௐPHWௐZLWKௐDௐSXUFKDVHௐRUGHUௐ(YHU\ௐPRQWKௐZHௐHYDOXDWHௐRXUௐ VDOHVௐLQGLFDWRUVௐDQGௐFORVHO\ௐPRQLWRUௐWKHௐYROXPHௐDQGௐIUHTXHQF\ௐRIௐVDOHVௐ 2QHௐH[DPSOHௐLVௐE\ௐHYDOXDWLQJௐZKLFKௐPHPEHUVௐDUHௐSXUFKDVLQJௐIURPௐRXUௐ SODWIRUPௐ±ௐQHZௐPHPEHUVௐRUௐIUHTXHQWௐPHPEHUVௐWRௐHQVXUHௐZHௐDUHௐJURZLQJௐ RXUௐPHPEHUௐEDVHௐ:HௐXVHௐWKHVHௐPHWULFVௐWRௐPHDVXUHௐRXUௐSURMHFWHGௐJURZWKௐ UDWHௐDQGௐZRUNௐWRௐH[FHHGௐRXUௐH[SHFWDWLRQV
,GHQWLI\ௐDௐSURSRVHGௐDGPLQLVWUDWLYHௐIHHௐWKDWௐ\RXௐZLOOௐSD\ௐWRௐ6RXUFHZHOOௐIRUௐ IDFLOLWDWLQJௐPDQDJLQJௐDQGௐSURPRWLQJௐWKHௐ6RXUFHZHOOௐ&RQWUDFWௐLQௐWKHௐHYHQWௐWKDWௐ \RXௐDUHௐDZDUGHGௐDௐ&RQWUDFWௐௐ7KLVௐIHHௐLVௐW\SLFDOO\ௐFDOFXODWHGௐDVௐDௐSHUFHQWDJHௐRIௐ 9HQGRU¶VௐVDOHVௐXQGHUௐWKHௐ&RQWUDFWௐRUௐDVௐDௐSHUXQLWௐIHH
ௐLWௐLVௐQRWௐDௐOLQHLWHPௐ
DGGLWLRQௐWRௐWKHௐ0HPEHU¶VௐFRVWௐRIௐJRRGVௐ
6HHௐWKHௐ5)3ௐDQGௐWHPSODWHௐ&RQWUDFWௐIRUௐ
DGGLWLRQDOௐGHWDLOV
1$)*ௐZLOOௐVXEPLWௐௐௐSHUௐYHKLFOHௐSXUFKDVHGௐWKURXJKௐ1$)*ௐDQGௐௐௐ SHUௐYHKLFOHௐSXUFKDVHGௐWKRXJKௐRXUௐSDUWQHUௐGHDOHUௐ$ODQௐ-D\ௐ$XWRPRWLYHௐ)RUௐ WKHௐSXUSRVHௐRIௐDQௐDGPLQௐIHHௐWKHUHௐDUHௐQRௐRWKHUௐSDUWQHUௐGHDOHUௐJURXSVௐ FRQVLGHUHG
7DEOH$
'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV /LQH
,WHP 4XHVWLRQ 5HVSRQVH
3URYLGHௐDௐGHWDLOHGௐGHVFULSWLRQௐRIௐWKHௐHTXLSPHQWௐ
SURGXFWVௐDQGௐVHUYLFHVௐWKDWௐ\RXௐDUHௐRIIHULQJௐLQௐ\RXUௐ
SURSRVDO
1$)*ௐKDVௐSURYLGHGௐDௐ³0RGHOௐ5ROOௐ2XW´ௐ&KDUWVௐLQௐWKHௐ³3ULFHௐ)LOH´ௐ]LSௐEXWௐRIௐWKHௐௐPDQXIDFWXUHUVௐZHௐ UHSUHVHQWௐWKH\ௐKDYHௐRYHUௐௐPDNHVௐDQGௐPRGHOVௐIRUௐPHPEHUVௐWRௐFKRRVHௐIURPௐWKDWௐUDQJHௐIURPௐ&ODVVௐ ௐDQGௐVXSSRUWLQJௐ&ODVVௐௐ&DEௐDQGௐ&KDVVLVௐWUXFNVௐ1$)*¶VௐSODWIRUPVௐFDQௐDGGௐDQ\ௐXSILWௐRIௐWKHLUௐ FKRRVLQJௐUDQJLQJௐIURPௐWRROER[HVௐWRௐ/LQHௐ0HFKDQLFௐ%RGLHVௐ$Q\ௐDQGௐDOOௐXSILWVௐFDQௐEHௐDGGHGௐWRௐDQ\ௐ RQHௐRIௐRXUௐYHKLFOHVௐWKURXJKௐRQHௐRIௐRXUௐXSILWௐSDUWQHUௐVXSSOLHUVௐRUௐE\ௐDQௐXSILWௐVXSSOLHUௐRIௐWKHௐPHPEHUVௐ FKRRVLQJௐ1$)*ௐDQGௐWKHௐVXSSOLHUௐZLOOௐZRUNௐWRJHWKHUௐWRௐVXSSO\ௐPHPEHUVௐZLWKௐWXUQNH\ௐTXRWHV
:LWKLQௐWKLVௐ5)3ௐFDWHJRU\ௐWKHUHௐPD\ௐEHௐVXEFDWHJRULHVௐ RIௐVROXWLRQVௐ/LVWௐVXEFDWHJRU\ௐWLWOHVௐWKDWௐEHVWௐGHVFULEHௐ \RXUௐSURGXFWVௐDQGௐVHUYLFHV
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐOLVWVௐWKHௐPDNHVௐDQGௐPRGHOVௐRIௐDOOௐௐPDQXIDFWXUHUVௐZHௐUHSUHVHQWௐXQGHUௐWKHௐ =,3ௐ)LOHௐ³$OOௐௐ0DQXIDFWXUHV´ௐௐ7KHVHௐௐ2(0VௐPDNHௐXSௐRYHUௐௐFRPELQHGௐPDNHVௐPRGHOVௐDQGௐ HQJLQHௐFRPELQDWLRQVௐIRUௐPHPEHUVௐWRௐVHOHFWௐIURPௐDORQJௐZLWKௐVHYHUDOௐVXEWLWOHௐ³8SILWV´ௐGHWDLOHGௐIRUௐ PHPEHUVௐLQௐWKHௐSULFHௐILOH
7DEOH%
'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV ,QGLFDWHEHORZLIWKHOLVWHGW\SHVRUFODVVHVRIHTXLSPHQWSURGXFWVDQGVHUYLFHVDUHRIIHUHGZLWKLQ\RXUSURSRVDO3URYLGHDGGLWLRQDOFRPPHQWVLQWKHWH[WER[ SURYLGHGDVQHFHVVDU\
/LQH,WHP &DWHJRU\RU7\SH 2IIHUHG
&RPPHQWV
$XWRPRELOHV <HV
1R
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐZHOOௐDERYHௐௐ
PDNHVௐDQGௐPRGHOV
6SRUWௐ8WLOLW\ௐ9HKLFOHV <HV
1R
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐZHOOௐDERYHௐௐ
PDNHVௐDQGௐPRGHOV
9DQV <HV
1R
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐZHOOௐDERYHௐௐ
PDNHVௐDQGௐPRGHOV
7UXFNV <HV
1R
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐZHOOௐDERYHௐௐ
PDNHVௐDQGௐPRGHOV
9HKLFOHVௐGHVFULEHGௐLQௐ/LQHVௐௐDERYHௐIRUௐ3XEOLFௐ6DIHW\ௐ
DSSOLFDWLRQV
<HV
1R
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐZHOOௐDERYHௐௐ
PDNHVௐDQGௐPRGHOV
&RQYHQWLRQDOௐLQWHUQDOௐFRPEXVWLRQௐPRGHOV <HV
1R
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐZHOOௐDERYHௐௐ
PDNHVௐDQGௐPRGHOV
1DWXUDOௐJDVௐRUௐSURSDQHௐDXWRJDVௐK\EULGௐRUௐDOWHUQDWLYHௐIXHOௐ PRGHOV
<HV
1R
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐZHOOௐDERYHௐௐ
PDNHVௐDQGௐPRGHOV
(OHFWULFௐSRZHUHGௐPRGHOV <HV
1R
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐZHOOௐDERYHௐௐ
PDNHVௐDQGௐPRGHOV
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
7DEOH
([FHSWLRQVWR7HUPV&RQGLWLRQVRU6SHFLILFDWLRQV)RUP /LQH,WHP127,&(
7RLGHQWLI\DQ\H[FHSWLRQRUWRUHTXHVWDQ\PRGLILFDWLRQWRWKH6RXUFHZHOOWHPSODWH&RQWUDFWWHUPVFRQGLWLRQVRUVSHFLILFDWLRQVD 3URSRVHUPXVWVXEPLWWKHH[FHSWLRQRUUHTXHVWHGPRGLILFDWLRQRQWKH([FHSWLRQVWR7HUPV&RQGLWLRQVRU6SHFLILFDWLRQV)RUPLPPHGLDWHO\EHORZ7KHFRQWUDFW VHFWLRQWKHVSHFLILFWH[WDGGUHVVHGE\WKHH[FHSWLRQRUUHTXHVWHGPRGLILFDWLRQDQGWKHSURSRVHGPRGLILFDWLRQPXVWEHLGHQWLILHGLQGHWDLO3URSRVHU VH[FHSWLRQVDQG
SURSRVHGPRGLILFDWLRQVDUHVXEMHFWWRUHYLHZDQGDSSURYDORI6RXUFHZHOODQGZLOOQRWDXWRPDWLFDOO\EHLQFOXGHGLQWKHFRQWUDFW &RQWUDFW6HFWLRQ 7HUP&RQGLWLRQRU6SHFLILFDWLRQ ([FHSWLRQRU3URSRVHG0RGLILFDWLRQ
'RFXPHQWV
(QVXUH\RXUVXEPLVVLRQGRFXPHQW
V
FRQIRUPVWRWKHIROORZLQJ
'RFXPHQWVLQ3')IRUPDWDUHSUHIHUUHG'RFXPHQWVLQ:RUG([FHORUFRPSDWLEOHIRUPDWVPD\DOVREHSURYLGHG 'RFXPHQWVVKRXOG127KDYHDVHFXULW\SDVVZRUGDV6RXUFHZHOOPD\QRWEHDEOHWRRSHQWKHILOH,WLV\RXUVROHUHVSRQVLELOLW\WRHQVXUHWKDWWKHXSORDGHG
GRFXPHQW
V
DUHQRWHLWKHUGHIHFWLYHFRUUXSWHGRUEODQNDQGWKDWWKHGRFXPHQWVFDQEHRSHQHGDQGYLHZHGE\6RXUFHZHOO 6RXUFHZHOOPD\UHMHFWDQ\UHVSRQVHZKHUHDQ\GRFXPHQW V
FDQQRWEHRSHQHGDQGYLHZHGE\6RXUFHZHOO
,I\RXQHHGWRXSORDGPRUHWKDQRQH
GRFXPHQWIRUDVLQJOHLWHP\RXVKRXOGFRPELQHWKHGRFXPHQWVLQWRRQH]LSSHGILOH,IWKH]LSSHGILOHFRQWDLQVPRUHWKDQ RQH
GRFXPHQWHQVXUHHDFKGRFXPHQWLVQDPHGLQUHODWLRQWRWKHVXEPLVVLRQIRUPDWLWHPUHVSRQGLQJWR)RUH[DPSOHLIUHVSRQGLQJWRWKH0DUNHWLQJ3ODQ FDWHJRU\VDYHWKHGRFXPHQWDV³0DUNHWLQJ3ODQ´
3ULFLQJ1$)*3ULFH)LOHIRU%LG
]LS0RQGD\6HSWHPEHU
)LQDQFLDO6WUHQJWKDQG6WDELOLW\0DUNHW6XFFHVVDQG)LQDQFLDO6WDELOLW\]LS0RQGD\6HSWHPEHU
0DUNHWLQJ3ODQ6DPSOHV0DUNHWLQJ3ODQ&RPSUHVVHG]LS7XHVGD\6HSWHPEHU
:0%(0%(6%(RU5HODWHG&HUWLILFDWHV,QVXUDQFHDQG5HODWHG'RFXPHQWV]LS7XHVGD\6HSWHPEHU
:DUUDQW\,QIRUPDWLRQ:DUUDQWLHV5)3
]LS7XHVGD\6HSWHPEHU
6WDQGDUG7UDQVDFWLRQ'RFXPHQW6DPSOHV6WDQGDUG7UDQVDFWLRQ]LS0RQGD\6HSWHPEHU
8SORDG$GGLWLRQDO'RFXPHQW$//0DNHVDQG8SILWV]LS7XHVGD\6HSWHPEHU
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
$GGHQGD7HUPVDQG&RQGLWLRQV
352326(5$)),'$9,7$1'$6685$1&(2)&203/,$1&(
,FHUWLI\WKDW,DPWKHDXWKRUL]HGUHSUHVHQWDWLYHRIWKH3URSRVHUVXEPLWWLQJWKHIRUHJRLQJ3URSRVDOZLWKWKHOHJDODXWKRULW\WRELQGWKH3URSRVHUWRWKLV$IILGDYLWDQG $VVXUDQFHRI&RPSOLDQFH
7KH3URSRVHULVVXEPLWWLQJWKLV3URSRVDOXQGHULWVIXOODQGFRPSOHWHOHJDOQDPHDQGWKH3URSRVHUOHJDOO\H[LVWVLQJRRGVWDQGLQJLQWKHMXULVGLFWLRQRILWV UHVLGHQFH
7KH3URSRVHUZDUUDQWVWKDWWKHLQIRUPDWLRQSURYLGHGLQWKLV3URSRVDOLVWUXHFRUUHFWDQGUHOLDEOHIRUSXUSRVHVRIHYDOXDWLRQIRUFRQWUDFWDZDUG 7KH3URSRVHULQFOXGLQJDQ\SHUVRQDVVLVWLQJZLWKWKHFUHDWLRQRIWKLV3URSRVDOKDVDUULYHGDWWKLV3URSRVDOLQGHSHQGHQWO\DQGWKH3URSRVDOKDVEHHQFUHDWHG ZLWKRXWFROOXGLQJZLWKDQ\RWKHUSHUVRQFRPSDQ\RUSDUWLHVWKDWKDYHRUZLOOVXEPLWDSURSRVDOXQGHUWKLVVROLFLWDWLRQ DQGWKH3URSRVDOKDVLQDOOUHVSHFWVEHHQ
FUHDWHGIDLUO\ZLWKRXWDQ\IUDXGRUGLVKRQHVW\7KH3URSRVHUKDVQRWGLUHFWO\RULQGLUHFWO\HQWHUHGLQWRDQ\DJUHHPHQWRUDUUDQJHPHQWZLWKDQ\SHUVRQRU EXVLQHVVLQDQHIIRUWWRLQIOXHQFHDQ\SDUWRIWKLVVROLFLWDWLRQRURSHUDWLRQVRIDUHVXOWLQJFRQWUDFW DQGWKH3URSRVHUKDVQRWWDNHQDQ\DFWLRQLQUHVWUDLQWRIIUHH WUDGHRUFRPSHWLWLYHQHVVLQFRQQHFWLRQZLWKWKLVVROLFLWDWLRQ$GGLWLRQDOO\LI3URSRVHUKDVZRUNHGZLWKDFRQVXOWDQWRQWKH3URSRVDOWKHFRQVXOWDQW DQLQGLYLGXDO
RUDFRPSDQ\
KDVQRWDVVLVWHGDQ\RWKHUHQWLW\WKDWKDVVXEPLWWHGRUZLOOVXEPLWDSURSRVDOIRUWKLVVROLFLWDWLRQ 7RWKHEHVWRILWVNQRZOHGJHDQGEHOLHIDQGH[FHSWDVRWKHUZLVHGLVFORVHGLQWKH3URSRVDOWKHUHDUHQRUHOHYDQWIDFWVRUFLUFXPVWDQFHVZKLFKFRXOGJLYHULVHWR DQRUJDQL]DWLRQDOFRQIOLFWRILQWHUHVW$QRUJDQL]DWLRQDOFRQIOLFWRILQWHUHVWH[LVWVZKHQDYHQGRUKDVDQXQIDLUFRPSHWLWLYHDGYDQWDJHRUWKHYHQGRU¶VREMHFWLYLW\ LQSHUIRUPLQJWKHFRQWUDFWLVRUPLJKWEHLPSDLUHG
7KHFRQWHQWVRIWKH3URSRVDOKDYHQRWEHHQFRPPXQLFDWHGE\WKH3URSRVHURULWVHPSOR\HHVRUDJHQWVWRDQ\SHUVRQQRWDQHPSOR\HHRUOHJDOO\DXWKRUL]HG DJHQWRIWKH3URSRVHUDQGZLOOQRWEHFRPPXQLFDWHGWRDQ\VXFKSHUVRQVSULRUWR'XH'DWHRIWKLVVROLFLWDWLRQ ,IDZDUGHGDFRQWUDFWWKH3URSRVHUZLOOSURYLGHWR6RXUFHZHOO3DUWLFLSDWLQJ(QWLWLHVWKHHTXLSPHQWSURGXFWVDQGVHUYLFHVLQDFFRUGDQFHZLWKWKHWHUPV FRQGLWLRQVDQGVFRSHRIDUHVXOWLQJFRQWUDFW
7KH3URSRVHUSRVVHVVHVRUZLOOSRVVHVVEHIRUHGHOLYHULQJDQ\HTXLSPHQWSURGXFWVRUVHUYLFHVDOODSSOLFDEOHOLFHQVHVRUFHUWLILFDWLRQVQHFHVVDU\WRGHOLYHU VXFKHTXLSPHQWSURGXFWVRUVHUYLFHVXQGHUDQ\UHVXOWLQJFRQWUDFW 7KH3URSRVHUDJUHHVWRGHOLYHUHTXLSPHQWSURGXFWVDQGVHUYLFHVWKURXJKYDOLGFRQWUDFWVSXUFKDVHRUGHUVRUPHDQVWKDWDUHDFFHSWDEOHWR6RXUFHZHOO 0HPEHUV8QOHVVRWKHUZLVHDJUHHGWRWKH3URSRVHUPXVWSURYLGHRQO\QHZDQGILUVWTXDOLW\SURGXFWVDQGUHODWHGVHUYLFHVWR6RXUFHZHOO0HPEHUVXQGHUDQ DZDUGHG&RQWUDFW
7KH3URSRVHUZLOOFRPSO\ZLWKDOODSSOLFDEOHSURYLVLRQVRIIHGHUDOVWDWHDQGORFDOODZVUHJXODWLRQVUXOHVDQGRUGHUV 7KH3URSRVHUXQGHUVWDQGVWKDW6RXUFHZHOOZLOOUHMHFW5)3SURSRVDOVWKDWDUHPDUNHGFRQILGHQWLDO RUQRQSXEOLFHWF
HLWKHUVXEVWDQWLDOO\RULQWKHLUHQWLUHW\
8QGHU0LQQHVRWD6WDWXWHV6HFWLRQ
VXEGLYLVLRQDOOSURSRVDOVDUHFRQVLGHUHGQRQSXEOLFGDWDXQWLOWKHHYDOXDWLRQLVFRPSOHWHDQGD&RQWUDFWLV DZDUGHG$WWKDWSRLQWSURSRVDOVEHFRPHSXEOLFGDWD0LQQHVRWD6WDWXWHV6HFWLRQSHUPLWVRQO\FHUWDLQQDUURZO\GHILQHGGDWDWREHFRQVLGHUHGDWUDGH VHFUHWDQGWKXVQRQSXEOLFGDWDXQGHU0LQQHVRWD
V'DWD3UDFWLFHV$FW
3URSRVHULWVHPSOR\HHVDJHQWVDQGVXEFRQWUDFWRUVDUHQRW
,QFOXGHGRQWKH³6SHFLDOO\'HVLJQDWHG1DWLRQDOVDQG%ORFNHG3HUVRQV´OLVWPDLQWDLQHGE\WKH2IILFHRI)RUHLJQ$VVHWV&RQWURORIWKH8QLWHG6WDWHV 'HSDUWPHQWRIWKH7UHDVXU\IRXQGDW
KWWSV
ZZZWUHDVXU\JRYRIDFGRZQORDGVVGQOLVWSGI
,QFOXGHGRQWKHJRYHUQPHQWZLGHH[FOXVLRQVOLVWVLQWKH8QLWHG6WDWHV6\VWHPIRU$ZDUG0DQDJHPHQWIRXQGDW KWWSV
VDPJRY6$0
RU
3UHVHQWO\GHEDUUHGVXVSHQGHGSURSRVHGIRUGHEDUPHQWGHFODUHGLQHOLJLEOHRUYROXQWDULO\H[FOXGHGIURPSURJUDPVRSHUDWHGE\WKH6WDWHRI0LQQHVRWD
WKH8QLWHG6WDWHVIHGHUDOJRYHUQPHQWRUWKH&DQDGLDQJRYHUQPHQWDVDSSOLFDEOH RUDQ\3DUWLFLSDWLQJ(QWLW\9HQGRUFHUWLILHVDQGZDUUDQWVWKDWQHLWKHULW QRULWVSULQFLSDOVKDYHEHHQFRQYLFWHGRIDFULPLQDORIIHQVHUHODWHGWRWKHVXEMHFWPDWWHURIWKLVVROLFLWDWLRQ %\FKHFNLQJWKLVER[,DFNQRZOHGJHWKDW,DPERXQGE\WKHWHUPVRIWKH3URSRVHU¶V$IILGDYLWKDYHWKHOHJDODXWKRULW\WRVXEPLWWKLV3URSRVDORQEHKDOIRIWKH 3URSRVHUDQGWKDWWKLVHOHFWURQLFDFNQRZOHGJPHQWKDVWKHVDPHOHJDOHIIHFWYDOLGLW\DQGHQIRUFHDELOLW\DVLI,KDGKDQGVLJQHGWKH3URSRVDO7KLVVLJQDWXUHZLOOQRW EHGHQLHGVXFKOHJDOHIIHFWYDOLGLW\RUHQIRUFHDELOLW\VROHO\EHFDXVHDQHOHFWURQLFVLJQDWXUHRUHOHFWURQLFUHFRUGZDVXVHGLQLWVIRUPDWLRQ-HVVH&RRSHU)OHHW 0DQDJHU+RXU//&
7KH3URSRVHUGHFODUHVWKDWWKHUHLVDQDFWXDORUSRWHQWLDO&RQIOLFWRI,QWHUHVWUHODWLQJWRWKHSUHSDUDWLRQRILWVVXEPLVVLRQDQGRUWKH3URSRVHUIRUHVHHVDQDFWXDORU SRWHQWLDO&RQIOLFWRI,QWHUHVWLQSHUIRUPLQJWKHFRQWUDFWXDOREOLJDWLRQVFRQWHPSODWHGLQWKHELG <HV 1R
7KH%LGGHUDFNQRZOHGJHVDQGDJUHHVWKDWWKHDGGHQGXPDGGHQGDEHORZIRUPSDUWRIWKH%LG'RFXPHQW Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
&KHFNWKHER[LQWKHFROXPQ,KDYHUHYLHZHGWKLVDGGHQGXPEHORZWRDFNQRZOHGJHHDFKRIWKHDGGHQGD )LOH1DPH
,KDYHUHYLHZHGWKH
EHORZDGGHQGXPDQG
DWWDFKPHQWV
LI
DSSOLFDEOH
3DJHV
$GGHQGXPBB$XWRVB689VB9DQVB7UXFNVB5)3B
:HG6HSWHPEHU
30
$GGHQGXPBB$XWRVB689VB9DQVB7UXFNVB5)3B
7XH6HSWHPEHU
30
$GGHQGXPBB$XWRVB689VB9DQVB7UXFNVB5)3B
7KX$XJXVW
30
$GGHQGXPBB$XWRVB689VB9DQVB7UXFNVB5)3B
0RQ$XJXVW
$0
$GGHQGXPBB$XWRVB689VB9DQVB7UXFNVB5)3B
6XQ$XJXVW
30
$GGHQGXPBB$XWRVB689VB9DQVB7UXFNVB5)3B
7KX$XJXVW
30
Bid Number: RFP 091521 Vendor Name: 72 HOUR LLC
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
RFP #091521
REQUEST FOR PROPOSALS
for
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Proposal Due Date: September 15, 2021, 4:30 p.m., Central Time Sourcewell, a State of Minnesota local government unit and service cooperative, is requesting proposals for Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories to result in a contracting solution for use by its Participating Entities. Sourcewell Participating Entities include thousands of governmental, higher education, K-12 education, nonprofit, tribal government, and other public agencies located in the United States and Canada. A full copy of the Request for Proposals can be found on the Sourcewell Procurement Portal [https://proportal.sourcewell-mn.gov]. Only proposals submitted through the Sourcewell Procurement Portal will be considered. Proposals are due no later than September 15, 2021, at 4:30 p.m. Central Time, and late proposals will not be considered.
Solicitation Schedule
Public Notice of RFP Published: July 28, 2021
Pre-proposal Conference: August 25, 2021, 10:00 a.m., Central Time Question Submission Deadline: September 8, 2021, 4:30 p.m., Central Time Proposal Due Date: September 15, 2021, 4:30 p.m., Central Time Late responses will not be considered.
Opening: September 15, 2021, 6:30 p.m., Central Time
See RFP Section V.G. “Opening”
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
I. ABOUT SOURCEWELL
A. SOURCEWELL
Sourcewell is a State of Minnesota local government unit and service cooperative created under the laws of the State of Minnesota (Minnesota Statutes Section 123A.21) that facilitates a competitive public solicitation and contract award process for the benefit of its 50,000+ participating entities across the United States and Canada. Sourcewell’s solicitation process complies with State of Minnesota law and policies, conforms to Canadian trade agreements, and results in cooperative purchasing solutions from which Sourcewell’s Participating Entities procure equipment, products, and services.
Cooperative purchasing provides participating entities and suppliers increased administrative efficiencies and the power of combined purchasing volume that result in overall cost savings. At times, Sourcewell also partners with other purchasing cooperatives to combine the purchasing volume of their membership into a single solicitation and contract expanding the reach of contracted suppliers’ potential pool of end users.
Sourcewell uses a website-based platform, the Sourcewell Procurement Portal, through which all proposals to this RFP must be submitted.
B. USE OF RESULTING CONTRACTS
In the United States, Sourcewell’s contracts are available for use by:
• Federal and state government entities1;
• Cities, towns, and counties/parishes;
• Education service cooperatives;
• K-12 and higher education entities;
• Tribal government entities;
• Some nonprofit entities; and
• Other public entities.
In Canada, Sourcewell’s contracts are available for use by:
• Provincial and territorial government departments, ministries, agencies, boards, councils, committees, commissions, and similar agencies; • Regional, local, district, and other forms of municipal government, municipal organizations, school boards, and publicly-funded academic, health, and social service entities referred to as MASH sector (this should be construed to include but not be limited to the Cities of Calgary, Edmonton, Toronto, Ottawa, and Winnipeg), as well as any corporation or entity owned or controlled by one or more of the preceding entities; 1 Pursuant to HAR §3-128-2, the State of Hawaii, Department of Accounting and General Services, State Procurement Office, on behalf of the State of Hawaii and participating jurisdictions, has provided notice of its Intent to Participate in the solicitation as a participating entity.
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
• Crown corporations, government enterprises, and other entities that are owned or controlled by these entities through ownership interest; • Members of the Rural Municipalities of Alberta (RMA) and their represented Associations: MASH (municipalities, academic institutions, schools and hospitals) and MUSH (municipalities, universities, schools and hospitals) sectors, and other governmental agencies eligible to use the Sourcewell contracts. MASH and MUSH sector refers to regional, local, district or other forms of municipal government, school boards, publicly-funded academic, health and social service entities, as well as any corporation or entity owned or controlled by one or more of the preceding entities, including but not limited to represented associations, Saskatchewan Association of Rural Municipalities ("SARM"), Association of Manitoba Municipalities ("AMM"), Local Authorities Services/Association of Municipalities Ontario ("LAS/AMO", excluding the cities of Toronto and Ottawa), Nova Scotia Federation of Municipalities (“NSFM”), Federation of Prince Edward Island Municipalities (“FPEIM”), Municipalities Newfoundland Labrador (“MNL”), Union of New Brunswick Municipalities (“UNBM”), North West Territories Association of Communities ("NWTAC") and their members.
RMA Participants may include all not-for-profit agencies for Canadian provinces and territories.
For a listing of current United States and Canadian Participating Entities visit Sourcewell’s website (note: there is a tab for each country): https://www.sourcewell-mn.gov/sourcewell-forvendors/agency-locator.
Participating Entities typically access contracted equipment, products, or services through a purchase order issued directly to the contracted supplier. A Participating Entity may request additional terms or conditions related to a purchase. Use of Sourcewell contracts is voluntary and Participating Entities retain the right to obtain similar equipment, products, or services from other sources.
To meet Participating Entities’ needs, Sourcewell broadly publishes public notice of all solicitation opportunities, including this RFP. In the United States each state-level procurement department receives notice for possible re-posting.
Proof of publication will be available at the conclusion of the solicitation process.
II. SOLICITATION DETAILS
A. SOLUTIONS-BASED SOLICITATION
This RFP and contract award process is a solutions-based solicitation; meaning that Sourcewell is seeking equipment, products, or services that meet the general requirements of the scope of this RFP and that are commonly desired or are required by law or industry standards.
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
B. REQUESTED EQUIPMENT, PRODUCTS, OR SERVICES
It is expected that proposers will offer a wide array of equipment, products, or services at lower prices and with better value than what they would ordinarily offer to a single government entity, a school district, or a regional cooperative.
1. Sourcewell is seeking proposals for Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories, including, but not to be limited to:
a. Vehicles of the following types and classifications:
i. Automobiles: mini, subcompact, compact, coupe, sedan, and full-size; ii. Sport Utility Vehicles: cross-over, light duty, and heavy duty; iii. Vans: passenger and cargo;
iv. Trucks: light duty, half ton, three-quarter ton, and one ton; and v. Vehicles of the varieties described in subsections 1. a. i – iv. above, with upfitting designed for Public Safety applications, such as equipment, lighting, technology, and accessories.
b. A wide range of vehicles by: 1) engine type, to include conventional internal combustion, natural gas or propane autogas, hybrid or alternative fuel, and electric powered solutions; 2) seating or cargo configurations, drive train options, and trim levels; and, 3) optional equipment offerings.
c. Proposers may include related equipment, accessories, supplies, parts, and services to the extent that the solutions are an incidental portion of the response.
2. This solicitation does not include those equipment, products, or services covered under categories included in contracts currently maintained by Sourcewell:
a. Ambulance and Emergency Medical Transport Vehicles, with Related Equipment, Accessories, And Supplies (RFP #022118);
b. Firefighting Apparatus, with Related Equipment, Accessories, and Supplies (RFP #022818);
c. Class 4-8 Chassis with Related Equipment, Accessories, and Services (RFP #060920); d. School Buses with Related Accessories, Supplies, Parts, and Services (RFP #063020); and, e. Electric Vehicle Supply Equipment and Related Services (RFP #042221).
Generally, the solutions for Participating Entities are turn-key solutions, providing a combination of equipment, products and services, delivery, and installation to a properly operating status. However, equipment or products only solutions may be appropriate for situations where Participating Entities possess the ability, either in-house or through local thirdparty contractors, to properly install and bring to operation the equipment or products being proposed.
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Sourcewell prefers suppliers that provide a sole source of responsibility for the equipment, products, and services provided under a resulting contract If proposer is including the equipment, products, and services of its subsidiary entities, the proposer must also identify all included subsidiaries in its proposal. If proposer requires the use of distributors, dealers, resellers, or subcontractors to provide the equipment, products, or services, the proposal must address how the equipment, products or services will be provided to Participating Entities, and describe the network of distributors, dealers, resellers, and/or subcontractors that will be available to serve Participating Entities under a resulting contract.
Sourcewell desires the broadest possible selection of equipment, products, and services being proposed over the largest possible geographic area and to the largest possible cross-section of Sourcewell current and future Participating Entities.
C. REQUIREMENTS
It is expected that proposers have knowledge of all applicable industry standards, laws, and regulations and possess an ability to market and distribute the equipment, products, or services to Participating Entities.
1. Safety Requirements. All items proposed must comply with current applicable safety or regulatory standards or codes.
2. Deviation from Industry Standard. Deviations from industry standards must be identified with an explanation of how the equipment, products, and services will provide equivalent function, coverage, performance, and/or related services.
3. New Equipment and Products. Proposed equipment and products must be for new, current model; however, proposer may offer certain close-out equipment or products if it is specifically noted in the Pricing proposal.
4. Delivered and operational. Unless clearly noted in the proposal, equipment and products must be delivered to the Participating Entity as operational.
5. Warranty. All equipment, products, supplies, and services must be covered by a warranty that is the industry standard or better.
D. ANTICIPATED CONTRACT TERM
Sourcewell anticipates that the term of any resulting contract(s) will be four years, with an optional one year extension that may be offered based on the best interests of Sourcewell and its Participating Entities.
E. ESTIMATED CONTRACT VALUE AND USAGE
Based on past volume of similar contracts, the estimated annual value of all transactions from contracts resulting from this RFP are anticipated to be USD $300 Million; therefore, proposers are expected to propose volume pricing. Sourcewell anticipates considerable activity under the
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
contract(s) awarded from this RFP; however, sales and sales volume from any resulting contract are not guaranteed.
F. MARKETING PLAN
Proposer’s sales force will be the primary source of communication with Participating Entities.
The proposer’s Marketing Plan should demonstrate proposer’s ability to deploy a sales force or dealer network to Participating Entities, as well as proposer’s sales and service capabilities. It is expected that proposer will promote and market any contract award.
G. ADDITIONAL CONSIDERATIONS
1. Contracts will be awarded to proposers able to best meet the need of Participating Entities. Proposers should submit their complete line of equipment, products, or services that are applicable to the scope of this RFP.
2. Proposers should include all relevant information in its proposal, since Sourcewell cannot consider information that is not included in the proposal. Sourcewell reserves the right to verify proposer’s information and may request clarification from a proposer, including samples of the proposed equipment or products.
3. Depending upon the responses received in a given category, Sourcewell may need to organize responses into subcategories in order to provide the broadest coverage of the requested equipment, products, or services to Participating Entities. Awards may be based on a subcategory.
4. A proposer’s documented negative past performance with Sourcewell or its Participating Entities occurring under a previously awarded Sourcewell contract may be considered in the evaluation of a proposal.
III. PRICING
A. REQUIREMENTS
All proposed pricing must be:
1. Either Line-Item Pricing or Percentage Discount from Catalog Pricing, or a combination of these:
a. Line-item Pricing is pricing based on each individual product or services. Each line must indicate the proposer’s published “List Price,” as well as the “Contract Price.” b. Percentage Discount from Catalog or Category is based on a percentage discount from a catalog or list price, defined as a published Manufacturer’s Suggested Retail Price (MSRP) for the products or services. Individualized percentage discounts can be applied to any number of defined product groupings. Proposers will be responsible for providing and maintaining current published MSRP with Sourcewell, and this pricing must be included in its proposal and provided throughout the term of any Contract resulting from this RFP.
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
2. The proposer’s not to exceed price. A not to exceed price is the highest price for which equipment, products, or services may be billed to a Participating Entity. However, it is permissible for suppliers to sell at a price that is lower than the contracted price.
3. Stated in U.S. and Canadian dollars (as applicable).
4. Clearly understandable, complete, and fully describe the total cost of acquisition (e.g., the cost of the proposed equipment, products, and services delivered and operational for its intended purpose in the Participating Entity’s location).
Proposers should clearly identify any costs that are NOT included in the proposed product or service pricing. This may include items such as installation, set up, mandatory training, or initial inspection. Include identification of any parties that impose such costs and their relationship to the proposer. Additionally, proposers should clearly describe any unique distribution and/or delivery methods or options offered in the proposal.
B. ADMINISTRATIVE FEES
Proposers are expected to pay to Sourcewell an administrative fee in exchange for Sourcewell facilitating the resulting contracts. The administrative fee is normally calculated as a percentage of the total sales to Participating Entitiesfor all contracted equipment, products, or services made during a calendar quarter, and is typically one percent (1%) to two percent (2%). In some categories, a flat fee may be an acceptable alternative.
IV. CONTRACT
Proposers awarded a contract will be required to execute a contract with Sourcewell (see attached template). Only those modifications the proposer indicates in its proposal will be available for discussion. Much of the language in the Contract reflects Minnesota legal requirements and cannot be altered. Numerous and/or onerous exceptions that contradict Minnesota law may result in the proposal being disqualified from further review and evaluation.
To request a modification to the template Contract, a proposer must submit the Exceptions to Terms, Conditions, or Specifications table with its proposal. Only those exceptions noted at the time of the proposal submission will be considered.
Exceptions must:
1. Clearly identify the affected article and section.
2. Clearly note the requested modification; and as applicable, provide requested alternative language.
Unclear requests will be automatically denied.
Only those exceptions that have been accepted by Sourcewell will be included in the contract document provided to the awarded supplier for signature.
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
If a proposer receives a contract award resulting from this solicitation it will have up to 30 days to sign and return the contract. After that time, at Sourcewell’s sole discretion, the contract award may be revoked.
V. RFP PROCESS
A. PRE-PROPOSAL CONFERENCE
Sourcewell will hold an optional, non-mandatory pre-proposal conference via webcast on the date and time noted in the Solicitation Schedule for this RFP and on the Sourcewell Procurement Portal. The purpose of this conference is to allow potential proposers to ask questions regarding this RFP and Sourcewell’s competitive contracting process. Information about the webcast will be sent to all entities that have registered for this solicitation opportunity through their Sourcewell Procurement Portal Supplier Account. Pre-proposal conference attendance is optional.
B. QUESTIONS REGARDING THIS RFP AND ORAL COMMUNICATION
All questions regarding this RFP must be submitted through the Sourcewell Procurement Portal.
The deadline for submission of questions is found in the Solicitation Schedule and on the Sourcewell Procurement Portal. Answers to questions will be issued through an addendum to this RFP. Repetitive questions will be summarized into a single answer and identifying information will be removed from the submitted questions.
All questions, whether specific to a proposer or generally related to the RFP, must be submitted using this process. Do not contact individual Sourcewell staff to ask questions or request information as this may disqualify the proposer from responding to this RFP. Sourcewell will not respond to questions submitted after the deadline.
C. ADDENDA
Sourcewell may modify this RFP at any time prior to the proposal due date by issuing an addendum. Addenda issued by Sourcewell become a part of the RFP and will be delivered to potential proposers through the Sourcewell Procurement Portal. Sourcewell accepts no liability in connection with the delivery of any addenda.
Before a proposal will be accepted through the Sourcewell Procurement Portal, all addenda, if any, must be acknowledged by the proposer by checking the box for each addendum. It is the responsibility of the proposer to check for any addenda that may have been issued up to the solicitation due date and time.
If an addendum is issued after a proposer submitted its proposal, the Sourcewell Procurement Portal will WITHDRAW the submission and change the proposer’s proposal status to INCOMPLETE. The proposer can view this status change in the “MY BIDS” section of the
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Sourcewell Procurement Portal Supplier Account. The proposer is solely responsible to check the “MY BIDS” section of the Sourcewell Procurement Portal Supplier Account periodically after submitting its proposal (and up to the Proposal Due Date). If the proposer’s proposal status has changed to INCOMPLETE, the proposer is solely responsible to:
i) make any required adjustments to its proposal;
ii) acknowledge the addenda; and
iii) ensure the re-submitted proposal is received through the Sourcewell Procurement Portal no later than the Proposal Due Date and time shown in the Solicitation Schedule above.
D. PROPOSAL SUBMISSION
Proposer’s complete proposal must be submitted through the Sourcewell Procurement Portal no later than the date and time specified in the Solicitation Schedule. Any other form of proposal submission, whether electronic, paper, or otherwise, will not be considered by Sourcewell. Late proposals will not be considered. It is the proposer’s sole responsibility to ensure that the proposal is received on time.
It is recommended that proposers allow sufficient time to upload the proposal and to resolve any issues that may arise. The time and date that a proposal is received by Sourcewell is solely determined by the Sourcewell Procurement Portal web clock.
In the event of problems with the Sourcewell Procurement Portal, follow the instructions for technical support posted in the portal. It may take up to 24 hours to respond to certain issues.
Upon successful submission of a proposal, the Sourcewell Procurement Portal will automatically generate a confirmation email to the proposer. If the proposer does not receive a confirmation email, contact Sourcewell’s support provider at [email protected].
To ensure receipt of the latest information and updates via email regarding this solicitation, or if the proposer has obtained this solicitation document from a third party, the onus is on the proposer to create a Sourcewell Procurement Portal Supplier Account and register for this solicitation opportunity.
Within the Sourcewell Procurement Portal, all proposals must be digitally acknowledged by an authorized representative of the proposer attesting that the information contained in in the proposal is true and accurate. By submitting a proposal, proposer warrants that the information provided is true, correct, and reliable for purposes of evaluation for potential contract award.
The submission of inaccurate, misleading, or false information is grounds for disqualification from a contract award and may subject the proposer to remedies available by law.
E. GENERAL PROPOSAL REQUIREMENTS
Proposals must be:
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
• In substantial compliance with the requirements of this RFP or it will be considered nonresponsive and be rejected.
• Complete. A proposal will be rejected if it is conditional or incomplete. • Submitted in English.
• Valid and irrevocable for 90 days following the Proposal Due Date.
Any and all costs incurred in responding to this RFP will be borne by the proposer.
F. PROPOSAL WITHDRAWAL
Prior to the proposal deadline, a proposer may withdraw its proposal.
G. OPENING
The Opening of proposals will be conducted electronically through the Sourcewell Procurement Portal. A list of all proposers will be made publicly available in the Sourcewell Procurement Portal after the Proposal Due Date, but no later than the Opening time listed in the Solicitation Schedule.
To view the list of proposers, verify that the Sourcewell Procurement Portal opportunities list search is set to “All” or “Closed.” The solicitation status will automatically change to “Closed” after the Proposal Due Date and Time.
VI. EVALUATION AND AWARD
A. EVALUATION
It is the intent of Sourcewell to award one or more contracts to responsive and responsible proposers offering the best overall quality, selection of equipment, products, and services, and price that meet the commonly requested specifications of Sourcewell and its Participating Entities. The award(s) will be limited to the number of proposers that Sourcewell determines is necessary to meet the needs of its Participating Entities. Factors to be considered in determining the number of contracts to be awarded in any category may include the following:
• The number of and geographic location of:
o Proposers necessary to offer a comprehensive selection of equipment, products, or services for Participating Entities’ use.
o A proposer’s sales and service network to assure availability of product supply and coverage to meet Participating Entities’ anticipated needs. • Total evaluation scores.
• The attributes of proposers, and their equipment, products, or services, to assist Participating Entities achieve environmental and social requirements, preferences, and goals.
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Information submitted as part of a proposal should be as specific as possible when responding to the RFP. Do not assume Sourcewell has any knowledge about a specific supplier or product.
B. AWARD(S)
Award(s) will be made to the proposer(s) whose proposal conforms to all conditions and requirements of the RFP, and consistent with the award criteria defined in this RFP.
Sourcewell may request written clarification of a proposal at any time during the evaluation process.
Proposal evaluation will be based on the following scoring criteria and the Sourcewell Evaluator Scoring Guide (a copy is available in the Sourcewell Procurement Portal):
Conformance to RFP Requirements 50
Financial Viability and Marketplace Success 75
Ability to Sell and Deliver Service 100
Marketing Plan 50
Value Added Attributes 75
Warranty 50
Depth and Breadth of Offered Equipment, Products, or Services 200 Pricing 400
TOTAL POINTS 1000
C. PROTESTS OF AWARDS
Any protest made under this RFP by a proposer must be in writing, addressed to Sourcewell’s Executive Director, and delivered to the Sourcewell office located at 202 12th Street NE, P.O.
Box 219, Staples, MN 56479. All documents that comprise the complete protest package must be received no later than 10 calendar days’ following Sourcewell’s notice of contract award(s) or non-award and must be time stamped by Sourcewell no later than 4:30 p.m., Central Time. A protest must allege a procedural, technical, or legal defect, with supporting documentation. A protest that merely requests a re-evaluation of a proposal’s content will not be entertained A protest must include the following items:
• The name, address, and telephone number of the protester; • Identification of the solicitation by RFP number;
• A precise statement of the relevant facts;
• Identification of the alleged procedural, technical, or legal defect; • Analysis of the basis for the protest;
• Any additional supporting documentation;
• The original signature of the protester or its representative; and • Protest bond in the amount of $20,000 (except where prohibited by law or treaty).
Rev. 3/2021 Sourcewell RFP #091521
Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Protests that do not address these elements will not be reviewed.
D. RIGHTS RESERVED
This RFP does not commit Sourcewell to award any contract, and a proposal may be rejected if it is nonresponsive, conditional, incomplete, conflicting, or misleading. Proposals that contain false statements or do not support an attribute or condition stated by the proposer may be rejected.
Sourcewell reserves the right to:
• Modify or cancel this RFP at any time;
• Reject any and all proposals received;
• Reject proposals that do not comply with the provisions of this RFP; • Select, for contracts or for discussion, a proposal other than that with the lowest cost; • Independently verify any information provided in a proposal; • Disqualify any proposer that does not meet the requirements of this RFP, is debarred or suspended by the United States or Canada, State of Minnesota, Participating Entity’s state or province; has an officer, or other key personnel, who have been charged with a serious crime; or is bankrupt, insolvent, or where bankruptcy or insolvency are a reasonable prospect;
• Waive or modify any informalities, irregularities, or inconsistencies in the proposals received;
• Clarify any part of a proposal and discuss any aspect of the proposal with any proposer; and negotiate with more than one proposer;
• Award a contract if only one responsive proposal is received if it is in the best interest of Participating Entities; and
• Award a contract to one or more proposers if it is in the best interest of Participating Entities.
E. DISPOSITION OF PROPOSALS
All materials submitted in response to this RFP will become property of Sourcewell and will become public record in accordance with Minnesota Statutes Section 13.591, after negotiations are complete. Sourcewell considers that negotiations are complete upon execution of a resulting contract. It is the proposer’s responsibility to clearly identify any data submitted that it considers to be protected. Proposer must also include a justification for the classification citing the applicable Minnesota law. Sourcewell may reject proposals that are marked confidential or nonpublic, either substantially or in their entirety.
Sourcewell will not consider the prices submitted by the proposer to be confidential, proprietary, or trade secret materials. Financial information, including financial statements, provided by a proposer is not considered trade secret under the statutory definition.
8/5/2021
Addendum No. 1
Solicitation Number: RFP 091521
Solicitation Name: Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Consider the following Question and Answer to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.
Question 1:
We manufacture service bodies and do not sell complete vehicles. Can we bid our product as an accessory to the bid?
Answer 1:
Refer to RFP Section II. B. 1. c., “Proposers may include related equipment, accessories, supplies, parts, and services to the extent that the solutions are an incidental portion of the response.” A proposal that does not include complete vehicles, of the types described in RFP Section II. B. 1. a., will be deemed non-responsive.
End of Addendum
Acknowledgement of this Addendum to RFP 091521 posted to the Sourcewell Procurement Portal on 8/5/2021, is required at the time of proposal submittal.
8/8/2021
Addendum No. 2
Solicitation Number: RFP 091521
Solicitation Name: Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Consider the following Question and Answer to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.
Question 1:
Are you accepting leasing options for this bid?
Answer 1:
Refer to RFP Section II. B. for the description of the requested equipment, products, and services. Sourcewell is seeking equipment, products, or services that meet the general requirements of the scope of this RFP and that are commonly desired by participating entities. A proposer may submit their complete line of equipment, products, or services that are applicable to the scope of this RFP. It is left to the discretion of each proposer to articulate their ability to serve Sourcewell participating entities.
End of Addendum
Acknowledgement of this Addendum to RFP 091521 posted to the Sourcewell Procurement Portal on 8/8/2021, is required at the time of proposal submittal.
8/23/2021
Addendum No. 3
Solicitation Number: RFP 091521
Solicitation Name: Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Consider the following Questions and Answers to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.
Question 1:
I would like to see an example of line-item pricing for Sourcewell. Please provide.
Answer 1:
In the competitive process, Sourcewell cannot conduct research for, or expressly identify resources that may be relevant to, a proposer. A proposer may review a sampling of past pricing proposals within the current awarded contract documentation available on the Sourcewell website. Navigate to the following address:
https://www.sourcewell-mn.gov/contract-search and use the list or search functions.
Question 2:
Where can I get a copy of the current contract pricing for the brand of vehicles that I offer?
Answer 2:
Each Sourcewell solicitation represents a separate and distinct opportunity. For examples of current Sourcewell-awarded contracts, refer to the link provided in Answer No. 1 above. Currently active contracts offering similar solutions were awarded under solicitation numbers 120716 and 060920.
End of Addendum
Acknowledgement of this Addendum to RFP 091521 posted to the Sourcewell Procurement Portal on 8/23/2021, is required at the time of proposal submittal.
8/26/2021
Addendum No. 4
Solicitation Number: RFP 091521
Solicitation Name: Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Consider the following Question and Answer to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.
Question 1:
The manufacturer that I represent has not developed pricing for the 2022 model year vehicles. Should pricing be presented for 2021 and 2022 models that have pricing, and a TBD associated with 2022 models that have yet to be priced by the manufacturer? Answer 1:
In the competitive process, Sourcewell will not advise a proposer on the content of the proposal. It is left to the discretion of each proposer to articulate and propose the pricing approach that aligns with its business methods and satisfies the requirements of RFP Section III. – Pricing. Proposals are evaluated based on the criteria stated in the RFP.
Refer also to the Sourcewell contract template for additional details on the process for requesting a product or pricing change during the term of an awarded contract. A downloadable version of the contract template is found on the Bid Details page for this solicitation within the Sourcewell Procurement Portal.
End of Addendum
Acknowledgement of this Addendum to RFP 091521 posted to the Sourcewell Procurement Portal on 8/26/2021, is required at the time of proposal submittal.
9/7/2021
Addendum No. 5
Solicitation Number: RFP 091521
Solicitation Name: Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Consider the following Questions and Answers to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.
Question 1:
We are requesting a clarification on Table 4 and Table 5. Could we include a reference from a fleet management company or a supplier we use?
Answer 1:
In the competitive process, Sourcewell will not advise a proposer on the content of the proposal. It is left to the discretion of each proposer to determine how to best demonstrate the ability to serve Sourcewell participating entities and satisfy all requirements of the questionnaire tables.
Question 2:
Is it acceptable to provide a redline of the entire Sourcewell template contract? Answer 2:
A request for modification to the Sourcewell contract template may only be submitted with a proposal. To request a modification to the template Contract terms, conditions, or specifications, a Proposer must complete and submit the Exceptions to Terms, Conditions, or Specifications Form, which is found as the final Table of Step 1 in the proposal submission process. A proposer may elect to include additional supporting materials in its discretion.
Question 3:
Could a video be uploaded as additional content?
Answer 3:
It is left to the discretion of each proposer to determine the method it deems best suited to submit its relevant information in a timely fashion through the Sourcewell Procurement Portal. Proposer’s complete proposal must be submitted through the Sourcewell Procurement Portal no later than the date and time specified in the Solicitation Schedule (RFP Section V. D.), and all relevant information should be included in the proposal (RFP Section II., G.).
Question 4:
Can you elaborate on line item 71? Is there a list of subcategory titles that can be used for reference?
Answer 4:
It is left to the discretion of the proposer to identify subcategory descriptors that may be relevant to the proposer’s offered equipment, products, and services.
End of Addendum
Acknowledgement of this Addendum to RFP 091521 posted to the Sourcewell Procurement Portal on Tuesday, September 7, 2021 6:58 PM, is required at the time of proposal submittal.
9/8/2021
Addendum No. 6
Solicitation Number: RFP 091521
Solicitation Name: Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories
Consider the following Questions and Answers to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.
Question 1:
With the ongoing supply chain delays related to Covid, microchip shortages, and acrossthe-industry shortages of raw materials, we respectfully request an extension to the submittal deadline.
Answer 1:
No extension of the due date is contemplated at this time.
Question 2:
In what format would you like financial stability to be verified? Answer 2:
In the competitive process, Sourcewell will not advise a proposer on the content of the proposal. It is left to the discretion of each proposer to determine how to best demonstrate its financial stability and satisfy all requirements of the questionnaire tables.
End of Addendum
Acknowledgement of this Addendum to RFP 091521 posted to the Sourcewell Procurement Portal on 9/8/2021, is required at the time of proposal submittal.
Proposal Opening Record
Date of opening:September 15, 2021
Sourcewell posted Request for Proposal #091521, for the procurement of Automobiles, SUVs, Vans, and Light Trucks with Related Equipment and Accessories, on the Sourcewell Procurement Portal [proportal.sourcewellͲ mn.gov] on Wednesday, July 28, 2021, and the solicitation remained in an open status within the portal until September 15, 2021, at 4:30 pm CT. The RFP required that all proposals be submitted through the Sourcewell Procurement Portal no later than 4:30 pm CT on September 15, 2021, the date and time specified in the Solicitation Schedule.
The undersigned certify that all responses received on Request for Proposal #091521 were submitted through the Sourcewell Procurement Portal, and that each Proposer’s response material was digitally sealed upon submission and remained inaccessible until the due date and time specified in the Solicitation Schedule.
Responses were received from the following:
72 HOUR, LLC dba National Auto Fleet GroupͲSubmitted 9/14/21 at 2:10:21 PM CONTEMPORARY MOTOR CARS, INC.ͲSubmitted 9/14/21 at 1:50:55 PM Creative Bus Sales, Inc.ͲSubmitted 9/15/21 at 2:39:01 PM Davis Chevrolet, GMC, Buick, Ltd.ͲSubmitted 9/15/21 at 2:25:01 PM Donlen, LLCͲSubmitted 9/15/21 at 9:21:53 AM
GreenPower Motor Company, Inc.ͲSubmitted 9/15/21 at 3:32:58 PM Lithia Toyota of Billings II, LLCͲSubmitted 9/14/21 at 2:29:57 PM Lordstown Motors Corp.ͲSubmitted 9/15/21 at 4:16:01 PM Mike Albert Leasing, Inc. dba Mike Albert Fleet SolutionsͲSubmitted 9/15/21 at 3:15:15 PM RO Truck & Equipment, LLC DBA RO Bus SalesͲSubmitted 9/14/21 at 7:57:35 PM Tesla, Inc.ͲSubmitted 9/15/21 at 1:27:00 PM
TROPICAL FORD, INC.ͲSubmitted 9/14/21 at 1:23:12 PM
VALLEY FORD TRUCK, INC.ͲSubmitted 9/15/21 at 11:15:01 AM The Proposals were opened electronically, and a list of all Proposers was made publicly available in the Sourcewell Procurement Portal, on September 15, 2021, at 4:36:55 PM CT. All responsive proposals were then submitted for review by the Sourcewell Evaluation Committee. ____________________________________________________________________ Chris Robinson, CPSM, Procurement ManagerCarol Jackson, Procurement Analyst
RESO UTBON NO. 2013- 07
A RESOLUTION OF CITY COUNCIL OF THE CITY OF LOS
ALAMITOS, CALIFORNIA, APPROVING THE
VEHICLE/ EQUIPMENT REPLACEMENT POLICY
WHEREAS, the City of Los Alamitos wishes to properly formalize a mechanism for vehicle/ equipment replacement and expenditures from the Fleet Maintenance Fund; and,
WHEREAS, Staff has conducted an intensive research to determine the best " practical policy that would serve the City of Los Alamitos and was able to develop a policy that incorporates all the City departments' needs for vehicles and equipment; and,
WHEREAS, the policy identifies timely budgeting procedures for ail departments, a replacement schedule that is based upon mileage and age, and a spreadsheet for determining internal charge rates; and,
WHEREAS, the policy will provide guidelines for vehicle replacement and allow for improved budgeting and planning with regard to the City' s fleet of vehicles.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LOS ALAMITOS DOES RESOLVE AS FOLLOWS:
SECTION 1. The City Council of the City of Los Alamitos, California, finds that the above recitals are true and correct.
SECTION 2. The City Council hereby approves the attached Vehicle/ Equipment Replacement Policy ( Exhibit A).
SECTION 3. The City Clerk shall certify as to the adoption of this Resolution.
PASSED, APPROVED, AND ADOPTED this 15t" day of April, 2013.
Warren Kusumoto, ayor
ATTEST:
indmera Quintanar, C C, Ci y-Cl rk
APPROVED AS TO FORM:
d`-'""
Steve Skolnik, Interim City Attorney
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF LOS ALAMITOS )
I, Windmera Quintanar, CMC, City Clerk of the City of Los Alamitos, do hereby certify that the foregoing Resolution was adopted at a meeting of the City Council held on the 15th day of April, 2013, by the following vote to wit:
AYES: COUNCILMEMBERS: Grose , Murnhy, Graham- D4ejia
NOES: COUNCILMEMBERS: Edgar , Kusumoto
ABSENT: COUNCILMEMBERS: None
ABSTAIN: COUNCILMEMBERS:
on
v
indme Quintanar, CMC, City C erk
CC RESO 2013- 07
Exhibit A
CITY OF LOS ALAMITOS
FLEET MAINTENANCE DIVISION
Vehicie/ Equipment Replacement
Guidelines/ Procedures
MISSION
The Public Works Fleet Maintenance Division' s mission is to provide and maintain the most appropriate, safe, reliable, and clean vehicles/ equipment allowing departments to better serve the residents.
OBJECTIVES
The objective of this vehiclelequipment replacement guidelinelprocedure is to promote an orderly system of funding, purchasing and managing a standardized fieet replacement process and to plan future departmental transportation requirements.
GENERAL
All City vehicles/ equipment acquired and maintained by Public Works Fleet Maintenance Division are recommended for replacement in accordance with this guideline/ procedure and all departments are responsible for complying with these guidelines/ procedures. Priority will be given to those departments whose services relate to public health, safety, and law enforcement.
As vehicles/equipment reach the targeted mileage and age of replacement criteria, a vehicle/ equipment maintenance evaluation wiil be performed by Public Works Fieet Maintenance Division. If the evaluation proves the vehicle/equipment would be economical to retain for an additionai year(s), the vehicle/ equipment will be targeted for retention or reassignment.
ACQUISITION
The Pubiic Works Fleet Maintenance Division is responsible for acquiring all City vehicies/ equipment with the approval of the City Council. Vehicles/ equipment are to be purchased using one of the following criteria:
Utilizing the " Piggy Back" process whenever possible, as more vehicles can be acquired at lower prices; or
CC RESO 2013- 07
EXn b t a
Request for Proposal ( RFP) process as outlined in Section 2. 60. 030 of the City' s Municipal Code; or
Purchases at an auction ( will require City Council pre- approval). The City Council will set a predetermined spending cap. The purchase decision wiil be made by the Public Works Superintendent.
Before any order is placed, the Public Works Fleet Maintenance Division and the user department will jointly review department requirements and vehicle/ equiprnent specifications. It is the Public Works Fleet Maintenance Division' s goal to select the proper vehicle/ equipment for the department. Suitability and appropriateness for the job intended, balanced by initial cost, depreciation/ resale vaBue, and maintenance repair factors are the primary factors for the review process. Compatibility with the rest of the fleet, fuel economy, safety/ repair records, and serviceability are also important considerations.
Once the replacement cycle is complete, the replaced vehicle/ equipment is evaluated for reassignment as a " low usage" vehicle to another department or declared surplus and sold at auction.
RETENTION or REASSIGNMENT
in some cases, it may be beneficial to reassign vehicies/ equipment to other departments that have " Iow usage" requirements. These decisions are made on a case by case basis between the Public Works Superintendent and the director of the department to which the vehicle is to re- assigned. The vehicle/ equipment must have one third of its life expectancy remaining ( years and mileage} and show a direct cost savings to the budget. Exception to this rule is if the vehicle/equipment in question has had major repairs completed within the past 12 months, deeming it reliable for use by the Fleet Maintenance Division.
ADDITIONS TO THE F EET
Additions are defined as any increase in the totai number of vehicies/ equipment assigned to a City' s department. Additions to the fleet are to be requested by City departments via a Vehicle/ Equipment Request Form and approved by the Department Head before submitting to the Public Works Fleet Maintenance Division.
REPLACED VEHICLE/EQUIPMENT
Replaced vehicles/ equipment that are not reassigned to another City department are to be declared surplus by the City Council. After the equipment is declared surplus, the Fleet Maintenance Division shall dispose of it in a manner best serving the interest of the City, which include:
CC RESO 2013-07
Exhibif A
Pubiic auction; or
Sale or transfer to other governmental entities; or
Sale or transfer to nonprofit entities
MID- YEAR REQUESTS
If a department desires to add or replace a vehic e/ equipment to the fleet, outside of the annual vehicle replacement request process, a completed Vehicle/ Equipment Request Form shail be submitted for processing. In addition to the Vehicle/ Equipment Request Form, a budget amendment request for funding may be needed. This request is to be submitted by November 1St of that year.
VEHICLE/ EQUIPMENT REQUEST CYCLE
The Public Works Fleet Maintenance Division initiates the vehicle/ equipment request cycle each year in February when departments are asked to submit requests for additional or replacement vehicleslequipment. Requests are reviewed and prioritized based on the vehicle or equipmenYs inspection report. Throughout February and March, the Public Works Fleet Maintenance Division works with departments to recommend a vehicle/equipment replacement list based on the strategic budget outlook and the total vehicle/ equipment replacement liability. In May, the Public Works Superintendent prepares the annual vehicle/ equipment replacement request for budget consideration from City Council.
REPLACEMENT CRITERIA*
Timely replacement ensures that vehicles/equipment are replaced once the life cycle, or economic costs, reach a minimum. The guidelines for vehicies/ equipment replacement are, but not limited to:
Predetermined age and/ or mileage
Mechanical condition
State of technology
Availability of replacement parts
Anticipated depreciation
Resale value
Operation costs
Safety standards
Departmental needs
Overall appearance
CC RESO 2013- 07
Exhibit A
The Public Works Fleet Maintenance Division recommends replacement of vehicles or equipment based on the above criteria met for each class of vehicie. A technical/ maintenance evaluation of requested replacement vehicles/ equipment will be perFormed by Pubiic Works Fleet Maintenance staff before each vehicle/ equipment is recommended for replacement. The targeted replacement cycles, in terms of years and miles, are as follows
DESCRIPTION AGE/MILES
Law Enforcement
Sedan — Patrol 4 yrs./ 75, 000 miles
SUV— Patrol 5 yrs./ 100, 000 miles
Detective/ Unmarked 5 yrs./75, 000 miles
Motorcycle 4 yrs./75, 000 miles
Administrative — Passenger 10 yrs./ 90, 000 miles
Light Duty Trucks
Sports Utility 10 yrs./90, 000 miles
Pickup & 4 x 4 10 yrs./ 95, 000 miles
Medium & Heavy Duty Trucks 15 yrs./ 100, 000 miles
Miscellaneous Equipment
Trailers By condition
Mowers (tractor style) By condition
The above vehicle replacement criteria are from Local Agency Surveys and City of Los Alamitos historicai data.
CC RESO 2013- 07
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 23, 2023 ITEM NUMBER: 11I
To: Mayor Tanya Doby & Members of the City Council
Presented By: Ron Noda, Development Services Director
Subject: Disposal of Surplus Equipment (City Fleet and Equipment)
SUMMARY
This item sets forth a recommendation to dispose of surplus equipment and a fleet vehicle valued between $8,975 - $17,175.
RECOMMENDATION
Declare the listed equipment and fleet as surplus and authorize its disposal in accordance with Los Alamitos Municipal Code (LAMC), Section 2.60.020.
BACKGROUND
The City has accumulated street maintenance equipment and vehicles that are obsolete and/or broken and have no potential use now or in the future. Section 2.60.020(H) of the Los Alamitos Municipal Code (LAMC) authorizes the City Manager to recommend the sale of all supplies and equipment which has become unsuitable for City use.
This item requests City Council's approval to surplus the specified equipment and fleet, which have no suitable use for the City. Once authorized, staff will contact the City’s auction services provider for disposal of the equipment. The Auctioneer will take on the responsibility of all transport of City property, advertising, sale and point of sale transactions.
DISCUSSION
The table below lists the estimated auction value for each item. The estimated auction value is derived from discussions with the City’s Auction Company, US Auctions. The table below (Table 1) also includes a low and high estimated action value for each item:
2023 Proposed Equipment and Vehicle Surplus
Item Previous
Vehicle/Equipment
Use
Estimated Auction Value
1982 Altas Copco
Serial No. 19995
Public Works $775 - $1,115
1996 Crafco Crack Sealer Trailer
Serial No. 1C9EP1226T1418200
Public Works $925 - $2,150
2001 MQ Whiteman Power Trowel
Serial No. MHZ5430
Public Works $1,050 - $2,750
2012 Looks Vision Public Works $1,300 - $2,210
Vin No. 53BTV1213DF004879
2012 Message Board
VIN No. 53BTV1213DF004879
Public Works $575 - $1,100
2013 FMC Trailer
VIN No. 1WW9DC061XK1063087
Public Works $1,100 - $2,750
2016 Dodge Charger
VIN No. 2C3CDXAT5GH188334
Patrol $3,250 - $5,100
Total Estimated Auction Value $8,975 - $17,175
FISCAL IMPACT
The equipment and vehicle surplus described in Table 1 has an estimated auction value between $8,975 to $17,175. When the items are sold at auction, the revenue will be placed in the Sale of Property Account No. 50-4830.
Attachment: None
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 23, 2023 ITEM NUMBER: 12A
To: Mayor Tanya Doby & Members of the City Council
Presented By: Chet Simmons, City Manager
Subject: Projects of Significance Update - MyLosAlEngage
SUMMARY
This Item provides an update on automation processes related to enhancing the City’s notification efforts related to projects of significance in the City.
RECOMMENDATION
Receive and file.
BACKGROUND
At its April 17, 2023 meeting, the Council adopted a policy for notifying the community on projects of significance. This policy is outlined in Administrative Regulation 9.1 available on the City's website. Since the implementation of this policy, the Director of Communications began meeting with various vendors for a community engagement platform. The goals of the platform are to provide an additional outlet to notify the public of large-scale projects throughout the City, provide the community a mechanism to track project timelines, and provide a transparent and accessible means for the community to provide feedback.
DISCUSSION
The City entered into an agreement under the City Manager's Authority with CitizenLab.
CitizenLab focuses on centralizing engagement and building community involvement, assists the City in building a brand and culture of engagement, and assists the City in establishing best practices for an effective community engagement strategy. Citizen Lab provides a platform for all large projects to have an informative landing web page. It allows for community feedback through surveys, emails, and comments. The landing page includes a comprehensive timeline that allows the community to see where the project is, where it's going, and how they can participate.
Staff began training on the new platform the week of October 9, with an anticipated launch date of early November. Before the launch of the new platform, "MyLosAlEngage", a notification campaign will be pushed out through the City's established communication channels, including the website, social media, and e-newsletter. MyLosAlEngage will be integrated into the City's existing website. Registration is not required to review the available information; however, some registration data is collected in order to participate in the community feedback portions (i.e. surveys, and comments). Staff is looking forward to the launch of the new platform and collaborating with our community.
The City Staff is dedicated to keeping our community informed and simplifying processes as much as possible. Below is a summary of the additional automation processes that have been taken on in the past year.
• CivicClerk is the City's agenda automation system. It allows the City to store agendas, minutes, and videos (when available) on the City's website. Residents are able to search past agendas and sign up to be notified of future meetings. • Laserfiche is the City's document repository system. This allows online access to commonly requested public records. Interested parties are able to search for agendas, minutes, resolutions, and ordinances from the convenience of their homes. Staff is looking to expand the available online records to include contracts and building permits, two of the most commonly requested types of records. Additionally, the Police Department is looking to automate with Laserfiche. Automation will allow for the quick retrieval of reports in the office and in the field, via a secured connection. • BidNet is the City's electronic bid submittal process. Automating this system increased transparency and equity throughout the bid process. A second component that will be launched in the coming months is the automation of contract approvals. Currently, contracts are routed through email for approval by various departments. BidNet will allow collaboration in real-time, store contracts in one central location, and notify Staff when renewals are coming up.
• Granicus is being used for the electronic filing of Form 700. Currently, Conflict of Interest Code filers have to file paper copies with the City Clerk's Office. The City Clerk's Office manually tracks when forms are received and files the paper copy.
Granicus will allow filings to be completed and stored electronically. This will help to ensure filers are filing in a timely manner and will allow staff to respond to requests for records quicker and more efficiently.
FISCAL IMPACT
Sufficient funding for the various platforms is available in the Council-approved Fiscal Year 2023-24 Administration budget.
Attachment: None
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 23, 2023 ITEM NUMBER: 12B
To: Mayor Tanya Doby & Members of the City Council
Presented By: Craig Koehler, Director of Finance
Subject: Consideration of an Accelerated Warrant Report Policy
SUMMARY
This report provides information in connection with a proposed acceleration of the Warrant Report Policy.
RECOMMENDATION
Approve the proposed accelerated distribution of the Warrant Register.
BACKGROUND
The Warrant Report is provided to the Council on a consent basis and covers checks and electronic funds transfers for the previous month or period (e.g. September 1, 2023 through September 30, 2023). The Director of Finance certifies the accuracy of the warrants and the availability of funds for payment.
DISCUSSION
The Warrent Register is a generally accepted municipal accounting tool used to highlight a city's expenditures over a set period of time. While it is a helpful summary of a city's expenditures, there is often a background or explanation needed in order to highlight the purpose of individual expenditures. While the staff diligently works in order to ensure they are prepared to answer any and all questions raised at City Council meetings, these registers can often contain between 200 to 300 different line items generated from the City's various departments and divisions. Given the desire to ensure that all information that is being provided is well researched and accurate, the Budget Standing Committee has developed the following policy in order to create greater transparency and to better facilitate the flow of this information.
As is customary in all cities, agendas and the related warrant registers are normally posted 72 hours before a City Council meeting. In an effort to provide more time for review, the Budget Standing Committee is recommending that the City adopt an accelerated timeline in order to provide the City Council with access to the Warrant Register on the Monday prior to the City Council meeting. For example, for the November City Council meeting, the Warrant Register would be provided to the City Council on Monday, November 13th, one week prior to the November 20th meeting date. This accelerated timeline would provide City Council members with an opportunity to review the Warrant Register and submit any related questions to the City's Finance Department in advance of the meeting. In doing so, those questions can be
properly researched and answered.
Under this accelerated timeline, Council members would be asked to submit their warrant related questions to the Finance Department prior to the close of business on the Thursday prior to the next City Council meeting. In the example used above, this would mean by Thursday, November 16th. Staff would then research the questions asked and provide responses to the entire City Council prior to the City Council meeting on Monday, November 20th. As these questions are often asked in order to highlight or underscore different expenditures that might be of interest to the public, Council members would then be able to ask these questions related to the warrants again at the Council meeting should they choose to. Any question not received by the Thursday deadline would then be researched and have their answers provided prior to the next City Council meeting. In accordance with the current information dissemination protocols, answers to any warrant questions will be provided to all Council members in a separate report.
FISCAL IMPACT
None.
Attachment: None
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 23, 2023 ITEM NUMBER: 12C
To: Mayor Tanya Doby & Members of the City Council
Presented By: Chet Simmons, City Manager
Subject: Resolution to Express Support for Actions to Retain Local Control Related to Local Zoning and Housing Issues
SUMMARY
This agenda item provides information on SB 9 which allows homeowners to create up to four homes on an existing parcel, in effect, eliminating single-family-only zoning. The item includes information on the charter cities of Carson, Del Mar, Redondo Beach, Torrance, and Whittier (Petitioner Cities) and their day in court arguing against the State of California on the constitutionality of SB 9.
RECOMMENDATION
Support retaining local control by Adopting Resolution No. 2023-23, entitled, "A RESOLUTION
OF CITY COUNCIL OF THE CITY OF LOS ALAMITOS, CALIFORNIA, EXPRESSING
SUPPORT FOR ACTIONS TO FURTHER STRENGTHEN LOCAL DEMOCRACY, AUTHORITY, AND CONTROL AS RELATED TO LOCAL ZONING AND HOUSING ISSUES".
BACKGROUND
SB 9 was signed by Governor Newsom on September 16, 2021, and chaptered by the Secretary of State. This bill will went into effect on January 1, 2022.
SB 9 made two important changes to state law:
• It allows homeowners in most areas around the state to divide their property into two lots, thereby increasing opportunities for homeownership in their neighborhood; and • It allows two homes to be built on each of those lots, with the effect of legalizing fourplexes in areas that previously only allowed one home without having to meet the minimum lot size required by the underlying zone.
On September 5, 2023, the charter cities of Carson, Del Mar, Redondo Beach, Torrance, and Whittier (Petitioner Cities) had their day in court arguing against the State of California on the constitutionality of SB 9, a law enacted in 2022 that in essence eliminates all single-family residential zones within the State. The Petitioner Cities argued that SB 9 unconstitutionally strips charter cities of their local land use authority and zoning control because it is not reasonably related to its stated purpose of promoting access to affordable housing, and is not narrowly tailored to avoid interference in local governance.
Judge Curtis Kin of Department 82, who is hearing the case, questioned the State’s position that SB 9 was enacted to promote housing at all income levels, when the legislative history and text of the statute appear to imply otherwise – that SB 9 was an affordable housing bill.
Attorney Pam Lee of Aleshire & Wynder, LLP, who argued on behalf of the Petitioner Cities, provided additional statutory and case law support that the legislature, in enacting SB 9, specifically included the term “affordable housing” to mean below market rate housing; yet none of the provisions of SB 9 are reasonably related to promoting such a purpose or narrowly tailored to avoid charter cities’ governance over local zoning of single-family residential zones.
Judge Kin took the matter under submission; he is expected to issue a decision in the coming weeks.
DISCUSSION
Staff’s recommendation is that the City Council discuss and vote to pass Resolution No. 2023- 23 to show support and speak with a unified voice among charter cities to retain local control.
FISCAL IMPACT
None.
Attachment: 1. Resolution No. 2023-23 - Support SB9
RESOLUTION NO. 2023-23
A RESOLUTION OF CITY COUNCIL OF THE CITY OF
LOS ALAMITOS, CALIFORNIA, EXPRESSING
SUPPORT FOR ACTIONS TO FURTHER
STRENGTHEN LOCAL DEMOCRACY, AUTHORITY,
AND CONTROL AS RELATED TO LOCAL ZONING
AND HOUSING ISSUES
WHEREAS, the legislature of the State of California each year proposes, passes, and has signed into law a number of bills addressing a range of housing issues; and
WHEREAS, the legislature of the State of California does not allow sufficient time between each legislative cycle to determine if the legislation is successful in bringing about the change for the State of California’s housing issues; and
WHEREAS, the majority of these bills usurp the authority of local jurisdictions to determine for themselves the land use policies and practices that best suit each city and its residents and instead impose mandates that do not take into account the needs and differences of jurisdictions throughout the State of California; and
WHEREAS, the ability of local jurisdictions to determine for themselves which projects require review beyond a ministerial approval; what parking requirements are appropriate for various neighborhoods within their jurisdiction; what plans and programs are suitable and practical for each community rather than having these decisions imposed upon cities without regard to the circumstances of each individual city; and what zoning should be allowed for residential properties is a matter of great import to the City of Los Alamitos among other items related to local zoning and housing issues; and WHEREAS, the City Council of the City of Los Alamitos feels strongly that our local government is best able to assess the needs of our community and objects to the proliferation of State legislation that deprives us of that ability.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LOS
ALAMITOS DOES RESOLVE AS FOLLOWS:
SECTION 1. The City Council of the City of Los Alamitos, California, finds that the above recitals are true and correct.
SECTION 2. The City of Los Alamitos is opposed to the current practice of the legislature of the State of California of continually proposing and passing multitudes of bills that directly impact and interfere with the ability of cities to
CC RESO 2023-23
control their own destiny through use of the zoning authority that has been granted to them.
SECTION 3. The City of Los Alamitos will explore various ways to protect the ability of cities to retain local control over zoning as each individual city within the State of California is best suited to determine how the zoning in their city should be allocated in order to meet the housing needs of the community.
SECTION 4. The City Clerk shall certify as to the adoption of this Resolution.
PASSED, APPROVED, AND ADOPTED this 23 day of October 2023. ________________________________
Tanya Doby, Mayor
ATTEST:
______________________________
Windmera Quintanar, MMC, City Clerk
APPROVED AS TO FORM:
_______________________________
Michael S. Daudt, City Attorney
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF LOS ALAMITOS )
I, Windmera Quintanar, CMC, City Clerk, of the City of Los Alamitos, do hereby certify that the foregoing Resolution was adopted at a regular meeting of the City Council held on the 23rd day of October, 2023, by the following vote, to wit:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ABSTAIN: COUNCILMEMBERS:
________________________________________
Windmera Quintanar, MMC, City Clerk
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 23, 2023 ITEM NUMBER: 12D
To: Mayor Tanya Doby & Members of the City Council
Presented By: Emeline Noda, Director of Recreation & Community Services Subject: Los Alamitos Community Foundation and City of Los Alamitos Memorandum of Understanding (MOU), Los Alamitos Senior Club and City of Los Alamitos Agreement, Los Alamitos Museum Insurance
SUMMARY
This agenda item provides draft Memorandum of Understandings (MOU) between the Los Alamitos Community Foundation and the City of Los Alamitos and the Agreement between the Los Alamitos Senior Club and the City of Los Alamitos. This item also addresses the reimbursement cost of insurance for both organizations, including the Los Alamitos Museum.
RECOMMENDATION
1. Review and discuss the Memorandum of Understanding (MOU) with the Los Alamitos Community Foundation and the Agreement with the Los Alamitos Senior Club; and,
2. Authorize the Mayor to execute the Memorandum of Understanding with the Los Alamitos Community Foundation; and,
3. Authorize the Mayor to execute the Agreement with the Los Alamitos Senior Club; and,
4. Discuss and provide direction concerning the City covering the cost of insurance for the Los Alamitos Community Foundation, Los Alamitos Senior Club, and Los Alamitos Museum; and,
5. Provide any feedback and/or further direction as necessary.
BACKGROUND
The Los Alamitos Senior Club, Los Alamitos Community Foundation, and Los Alamitos Museum are City-established non-profits that exist to support the City in funding and/or programs.
Los Alamitos Senior Club
The Los Alamitos Senior Club is a non-profit organization established in 1976. The club operates in both 501(c)3 and 501(c)7 statuses. The Club meets every Thursday at the Los Alamitos Community Center (City-owned facility) from 9:00 a.m. to 3:00 p.m. The Senior Club has its own Board of Directors and provides opportunities to meet new friends, develop new interests and socialize with one’s peers. Club activities include:
• Bingo
• table games
• luncheons, holiday parties and birthday celebrations
• guest speakers, crafts and entertainment
• charity projects and volunteer opportunities
Los Alamitos Community Foundation
In 2018, the City Council directed Staff to bring back an item that would allow discussing the possibility of creating a non-profit Foundation including duties, bylaws, funding and long-term management. The item was tabled after discussion and requested to bring back at a future date. At the October 18, 2021 City Council meeting, Council gave direction to Staff to begin the process of establishing a City Foundation that would assist in enhancing and supplementing the City of Los Alamitos revenues to enhance City-wide services and/or update facilities and infrastructure.
At the November 15, 2021 City Council meeting, Council voted on the name Los Alamitos Community Foundation. The Articles of Incorporation were filed with the Secretary of State on December 10, 2021. The first Los Alamitos Community Foundation Board Meeting was held on March 14, 2022, with the Bylaws adopted at the March 14, 2022 meeting. The Los Alamitos Community Foundation is an organization that partners with the City of Los Alamitos to provide funding to enhance programs and services offered through the City to benefit the residents of Los Alamitos.
Los Alamitos Museum
The City of Los Alamitos took over ownership of the Los Alamitos Museum (formerly the Los Alamitos Fire Station) from the County of Orange by resolution on July 3, 1974 and by Grant Deed on July 8, 1976. The Los Alamitos Museum property is owned by the City of Los Alamitos, granted to the City by the County of Orange as long as the property is used for “public museum or recreational purposes for the free and beneficial use of all County residents.”
The Los Alamitos Museum operates in a City-owned facility with the purpose of collecting, advancing, preserving and exhibiting the cultural, historical, and other related materials to receive the full benefit of the City of Los Alamitos' rich history.
DISCUSSION
The City of Los Alamitos and the Los Alamitos Senior Club partner together to provide senior services for the community. The City provides staff support and the Senior Club provides funding and volunteers. The agreement outlines the expectations for each entity and is up for renewal to be considered by the City Council.
The City of Los Alamitos and the Los Alamitos Community Foundation work together to support one another and a Memorandum of Understanding (MOU) has been developed to create an agreement between the two organizations. Outlined in the MOU details items such as the terms of the agreement, the City of Los Alamitos responsibilities, the Los Alamitos Community Foundation responsibilities, party responsibilities, insurance, and various other terms to be considered by the City Council.
The City of Los Alamitos entered into an agreement with the Los Alamitos Museum Association on July 28, 1975 with the purpose of collecting, preserving and exhibiting historical, cultural and other related materials in the community and to provide recreational programs in the fields of historical and cultural development for residents of the City and the County of Orange.Due to the basis of the organizations being established by the City to assist with funding the City’s operations or providing service providing historical and cultural development to the community, it is recommended that the City Council cover the costs of insurance for the three organizations.
FISCAL IMPACT
The cost to establishing a City of Los Alamitos Foundation was approximately $5,000. Funds raised by the Foundation goes directly to offset the expenses of the City of Los Alamitos to provide funding to enhance programs and services.
Staff support to the Los Alamitos Community Foundation, Los Alamitos Museum, and Los Alamitos Senior Club are all budgeted in the City's annual budget.
The cost to cover the insurance for all three organizations have been approved by the Budget Standing Committee and is under the purchasing authority of the City Manager.
Attachment: 1. Los Alamitos Community Foundation MOU
2. Los Alamitos Senior Club Agreement
1781470.2
City of Los Alamitos
MEMORANDUM OF UNDERSTANDING
LOS ALAMITOS COMMUNITYFOUNDATION
THIS MEMORANDUM OF UNDERSTANDING (“Agreement”) is made and entered into this 23 day of October, 2023 (“Effective Date”), by and between the CITY OF LOS ALAMITOS, a California charter city and municipal corporation (“City”) and THE LOS ALAMITOS COMMUNITY FOUNDATION, a California nonprofit public benefit corporation (“Foundation”). City and Foundation are sometimes hereinafter individually referred to as a “Party” and collectively as “Parties”.
RECITALS
WHEREAS, Foundation is a nonprofit organization with the public purpose, as stated in Article 3 of the Foundation’s Bylaws, to support the community of Los Alamitos; and WHEREAS, Foundation provides financial support to City to enhance services beyond the capabilities of local tax revenues by, among other things, raising additional funds for City facilities, programs and services.
WHEREAS, the Parties understand and agree that Foundation is not an entity of the City, but that Foundation regularly interacts and cooperates with the City to supplement or organize community events, including without limitation Beverage Gardens and Fireworks Stands; and
WHEREAS, the Parties desire to enter into this Agreement to set forth and memorialize the responsibilities of both Parties when cooperating to fulfill the public purpose of Foundation.
NOW, THEREFORE, in consideration of the promises and mutual obligations, covenants, and conditions contained herein, and other valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows:
AGREEMENT
1. Recitals; Term of Agreement.
1.1 Recitals. The recitals set forth above are hereby incorporated into this Amendment as though fully set forth herein and made part of the Agreement.
1.2 Term of Agreement. This Agreement shall commence upon the Effective Date and shall continue in full force and effect until terminated by one or both of the Parties. Either Party may terminate the Agreement at any time, with or without cause, by giving the other Party no less than thirty (30) days advance written notice.
2. City's Responsibilities...
2.1 Fee Waiver. City shall waive all application fees, security deposits, rental fees,
1781470.2
equipment fees and any other fees related to the Foundation's reservation and use of City parks, the Los Alamitos Community Center and other City-owned buildings (“City Facilities”) to conduct meetings, community programs and activities open to the public, and any special event permit application fees and traffic control fees under Los Alamitos Municipal Code Chapter 12.44.
2.2 Publishing Programs and Activities. Provided Foundation submits to the City a listing of Foundation programs and/or activities Foundation wishes to be published in City publications, such as social media, quarterly Recreation Brochure, and ENews and provided such information is submitted to the City with sufficient time for publication pursuant to the various production schedules provided to Foundation by City, City may publish, at no cost to Foundation or at shared cost with City in City's discretion,such listing of Foundation.
2.3 Staff Assistance and Equipment. City shall provide City staff assistance and City equipment for Foundation programs and activities, subject to the following conditions:
2.3.1 Foundation shall request in writing any use of City equipment or assistance by City staff for a Foundation program or activity at least thirty (30) days in advance.
2.3.2 City shall provide City staff assistance and City equipment to an extent that is reasonable in City’s sole discretion. City represents that a reasonable amount of City staff assistance is not more than an average of approximately ten (10) staff person-hours per month (cumulative hours), but may be more or fewer hours under the particular circumstances.
2.3.3 City shall waive all costs for Foundation's use of equipment owned by the City. Any other equipment required shall be either purchased or rented by Foundation at its sole expense.
2.3.4 City may require Foundation to reimburse City for City staff costs on a program-by-program basis in the City’s sole discretion. Notwithstanding the foregoing, part-time staff costs incurred by the City on the day of the Foundation program, activity or meeting shall always be fully reimbursed by Foundation. Staff costs shall be the actual costs incurred by the City, as determined by the current average rate including 5% in benefits, which is the same rate the City generally charges others for City staff costs.
3. Foundation’s Responsibilities.
3.1 Identifying City as Co-Sponsor. Foundation shall include the words “CoSponsored by the City of Los Alamitos” on all flyers, programs, advertisements, and press releases for all programs and activities jointly sponsored by City and Foundation. All such flyers, programs, advertisements, and press releases are subject to City approval, and may not be distributed without Cityapproval.
1781470.2
3.2 City Announcements. Foundation shall provide reasonable space and time at Foundation programs and activities for City to disperse information and/or make microphone announcements.
3.3 Requests for City Permits. Foundation shall provide requests for needed City resources, including use of City Facilities and City staff or equipment, a minimum of thirty (30) days in advance of the Foundation program or activity start date.
3.4 Set up/Take Down. Foundation shall provide assistance with cleaning or set up/take down for use of City Facilities or City equipment for Foundation programs, activities or meetings, at no cost to City. Foundation staff, volunteers, and agents shall remain present onsite and available to assist City staff with cleaning and take down of facilities until City staff determines the facilities are adequately clean.
3.5 Licenses and Permits. Except as otherwise provided in Section 2.1, Foundation shall obtain at its sole cost and expense such licenses, permits, and approvals as may be required by law for the performance of its duties and obligations under this Agreement, and for all Foundation programs, activities, and meetings.
3.6 Records. Foundation shall keep accurate records of costs incurred under this Agreement. Said records to be available to City upon request at reasonable times.
FOUNDATION shall keep said records for not less than two (2) years.
3.7 Assumption of Risk. Foundation assumes all risk for loss, damage (excluding normal wear and tear), liability, injury, cost or expense that may arise during, or be caused in any way by its use or occupancy of the City Facilities.
3.8 Insurance. Foundation shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise.
Minimum Scope and Limit of Insurance
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL) on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence. The general aggregate limit shall be twice the required occurrence limit.
2. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional insured Status