1757507. 1

2. COMPENSATION

2.1 Maximum Contract Amount. Contractor shall be compensated for the Project Services performed, including authorized reimbursements, if any, in accordance with the hourly rates and charges set forth in the Scope of Services. In no event shall the total compensation and costs payable to Contractor under this Agreement exceed the sum of 80% for permit and plan check fees up to $15,000, 65% of permit and plan check fees from $15,001 to $30,000 and 55% of permit and plan check fees over $ 30,001 up to $75,000, 50% of permit and plan check fees greater than 75,000 including counter, inspection, plan check, and Building Official oversight and an the annual cost of $ 20,000 for the Building Permitting Software via CityTech Solutions. The maximum amount of City’ s payment obligation under this Agreement is the amount specified in this section.

2.2 Method of Payment. In any month in which Contractor wishes to receive payment, Contractor shall no later than first working day of such month, submit to the City, in a form approved by the City Manager or his designee, an invoice for services rendered prior to the date of the invoice. Such requests shall be based upon the amount and value of the services performed by Contractor and accompanied by such reporting data including an itemized breakdown of all costs incurred and tasks performed during the period covered by the invoice, as may be required by the City. Within thirty (30) calendar days of receipt of invoice, City shall pay all undisputed amounts included on the invoice.

2.3 Changes in Scope. In the event any change or changes in the Scope of Services is requested by the City, the Parties shall execute a written amendment to this Agreement, signed by an individual authorized to formally bind the Party for which he/she is signing, setting forth with particularity all terms of such amendment, including, but not limited to, any additional professional fees. An amendment may be entered into: ( a) to provide for revisions or modifications to documents or other work product when documents or other work product or work is required by the enactment or revision of law subsequent to the preparation of any documents, other work product, or work; and/or, (b) to provide for additional services not included in this Agreement or not customarily furnished in accordance with generally accepted practice in Contractor’ s profession.

2.4 Appropriations. This Agreement is subject to and contingent upon funds being appropriated therefore by the Los Alamitos City Council for each fiscal year covered by the term of this Agreement. If such appropriations are not made, this Agreement shall automatically terminate without penalty to the City.

3. SCHEDULE OF PERFORMANCE

3.1 Time of Essence. Time is of the essence in the performance of this Agreement.

The time for completion of the Project Services to be performed by Contractor is an essential condition of this Agreement.

3.2 Schedule of Performance. Contractor shall prosecute regularly and diligently the Project Services according to the periods specified in the Scope of Services. When requested by Contractor, extensions of the time period( s) specified in the Scope of Services may be approved DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 162 of 469 ends

1757507. 1
in writing by the Contract Officer; however, the City shall not be obligated to grant any such extension.

3.3 Force Majeure. The time for performance of the Project Services may be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor ( financial inability excepted), including, but not limited to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, and/or acts of any governmental agency, including the City, if Contractor, within ten ( 10) calendar days of the commencement of such delay, notifies the City Manager in writing of the causes of the delay. The City Manager shall ascertain the facts and the extent of delay, and extend the time for performing the Services for the period of the enforced delay when and if in the judgment of the City Manager such delay is justified. The City Manager' s determination shall be final and conclusive upon the Parties to this Agreement. In no event shall Contractor be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Contractor' s sole remedy being extension of the Agreement pursuant to this section.

3.4 Term. Unless earlier terminated as provided elsewhere in this Agreement, this Agreement shall commence upon the Effective Date and shall continue in full force and effect for an initial period of three ( 3) years, ending on July 1, 2026, with two (2) possible - two (2) year extensions at the sole discretion for renewal by the City, ending on March 20, 2030.

4. COORDINATION OF PROJECT SERVICES

4.1 Contractor’ s Representative. The following principal of Contractor is hereby designated as being the principal and representative of Contractor authorized to act on its behalf with respect to the Project Services and to make all decisions in connection therewith: Mark Abbott It is expressly understood that the experience, knowledge, education, capability, expertise, and reputation of the foregoing principal is a substantial inducement for City to enter into this Agreement. Therefore, the foregoing principal shall be responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to personally supervise the Project Services performed hereunder. The foregoing principal may not be changed by Contractor without prior written approval of the Contract Officer.

4.2 City’ s Contract Officer. The City’ s Contract Officer shall be such person as may be designated by the City Manager, and is subject to change by the City Manager. It shall be the Contractor' s responsibility to ensure that the Contract Officer is kept fully informed of the progress of the performance of the Project Services, and the Contractor shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.

4.3 Prohibition Against Subcontracting or Assignments. The experience, knowledge, capability, expertise, and reputation of Contractor, its principals and employees, were a substantial inducement for City to enter into this Agreement. Therefore, Contractor shall not assign the performance of this Agreement, nor any part thereof, nor any monies due hereunder, DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 163 of 469 ends

1757507. 1
voluntarily or by operation of law, without the prior written consent of City. Contractor shall not contract with any other entity to perform the Project Services without prior written consent of City.

If Contractor is permitted by City to subcontract any part of this Agreement, Contractor shall be responsible to City for the acts and omissions of its subcontractor( s) in the same manner as it is for persons directly employed. Nothing contained in this Agreement shall create any contractual relationships between any subcontractor and City. All persons engaged in the performance of Project Services will be considered employees of Contractor. City will deal directly with and will make all payments to Contractor. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written consent of City.

Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent ( 25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release Contractor or any surety of Contractor from any liability hereunder without the express written consent of City.

4.4 Independent Contractor.

4.4.1 The legal relationship between the Parties is that of an independent contractor; nothing herein shall be deemed to make Contractor a City employee. During the performance of this Agreement, Contractor and its officers, employees, and agents shall act in an independent capacity and shall not act as City officers or employees. Contractor will determine the means, methods and details of performing the Project Services subject to the requirements of this Agreement. The personnel performing the Project Services on behalf of Contractor shall at all times be under Contractor’ s exclusive direction and control. Neither City nor any of its officials, officers, employees, agents or volunteers shall have control over the conduct of Contractor or any of its officers, employees, or agents, except as set forth in this Agreement. Contractor, its officers, employees or agents, shall not maintain a permanent office or fixed business location at City’ s offices. City shall have no voice in the selection, discharge, supervision, or control of Contractor’ s officers, employees, or agents or in fixing their number, compensation, or hours of service.

Contractor shall pay all wages, salaries, and other amounts due its employees in connection with the performance of Project Services and shall be responsible for all reports and obligations respecting them, including but not limited to social security income tax withholding, unemployment compensation, workers’ compensation, and other similar matters. City shall not in any way or for any purpose be deemed to be a partner of Contractor in its business or otherwise a joint venturer or a member of any joint enterprise with Contractor.

4.4.2 Contractor shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner.

4.4.3 No City benefits shall be available to Contractor, its officers, employees, representatives, agents, subconsultants or subcontractors in connection with the performance of any Project Services. Except for fees paid to Contractor as provided for in this Agreement, City shall not pay salaries, wages, or other compensation to Contractor for the performance of any Project Services. City shall not be liable for compensation or indemnification to Contractor, its DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 164 of 469 ends

1757507. 1
officers, employees, representatives, agents, subconsultants or subcontractors, for injury or sickness arising out of the performance of any Project Services. If for any reason any court or governmental agency determines that the City has financial obligations, other than pursuant to Section 2 herein, of any nature relating to salary, taxes, or benefits of Contractor’ s officers, employees, representatives, agents, or subconsultants or subcontractors, Contractor shall defend, indemnify, and hold harmless City from and against all such financial obligations.

4.5 PERS Eligibility Indemnification.

4.5.1 In the event that Contractor or any officer, employee, representative, agent, subconsultant or subcontractor of Contractor providing any Project Services claims or is determined by a court of competent jurisdiction or the California Public Employee Retirement System ( PERS) to be eligible for enrollment in PERS as an employee of the City, Contractor shall indemnify, defend, and hold harmless City against ( 1) all such claims and determinations, ( 2) for the payment of any employee and/or employer contributions for PERS benefits on behalf of Contractor or its officers, employees, representatives, agents, subconsultants or subcontractors, and (3) the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of the City.

4.5.2 Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Contractor and any of its officers, employees, representatives, agents, subconsultants or subcontractors providing any Project Services shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

5. INSURANCE

5.1 Compliance with Insurance Requirements. Contractor shall obtain, maintain, and keep in full force and effect during the term of this Agreement, at its sole cost and expense, and in a form and content satisfactory to City, all insurance required under this section. Contractor shall not commence any Project Services unless and until it has provided evidence satisfactory to City that it has secured all insurance required under this section. If Contractor’ s existing insurance policies do not meet the insurance requirements set forth herein, Contractor agrees to amend, supplement or endorse the policies to do so.

5.2 Types of Insurance Required. As a condition precedent to the effectiveness of this Agreement, and without limiting the indemnity provisions set forth in this Agreement, Contractor shall obtain and maintain in full force and effect during the term of this Agreement, including any extension thereof, the following policies of insurance:

5.2.1 Professional Liability/ Errors and Omissions Insurance (" PLI").

Contractor shall obtain and maintain a policy of Professional Liability or Errors and Omissions Insurance appropriate to Contractor’ s profession with per-claim and aggregate limits of no less than Two Million Dollars ($2,000,000.00). Covered professional services shall specifically include all Project Services to be performed under the Agreement and the policy shall be endorsed to delete DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 165 of 469 ends

1757507. 1
any exclusions that may exclude coverage for claims within the minimum PLI limits set forth herein for the Project Services to be performed under this Agreement.

5.2.1.1 The PLI policy shall be endorsed to delete any Contractual Liability Exclusion. The PLI shall include contractual liability coverage applicable to this Agreement. The policy must “ pay on behalf of” the insured, and include a provision establishing the insurer’ s duty to defend the insured.

5.2.1.2 If the PLI policy is written on a “ claims- made” basis, the policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of three ( 3) years from the date of the completion of all Project Services provided hereunder ( the PLI Coverage Period"). If any PLI policy is replaced, cancelled, non-renewed, discontinued, or otherwise terminated, or if the limits of a PLI policy are reduced or the available coverage depleted below the required minimum coverage amounts for any reason during the PLI Coverage Period, Contractor shall immediately obtain replacement PLI coverage meeting the requirements of this Section 5.2.1. Such replacement coverage shall satisfy all requirements herein, and shall include coverage for the prior acts or omissions of Contractor during the time period during which any Project Services were performed. The coverage shall be evidenced by either a new policy evidencing no gap in coverage, or by obtaining separate extended “ tail” coverage with the present or new carrier or other insurance arrangements providing for complete coverage, either of which shall be subject to the written approval by West- Comm.

5.2.1.3 If the PLI policy is written on an “ occurrence” basis, the policy shall be continued in full force and effect during the term of this Agreement, or until completion of the Project Services provided for in this Agreement, whichever is later. In the event of termination of the PLI policy during this period, new coverage shall immediately be obtained, and written evidence of the policy shall be immediately provided to West- Comm, to ensure PLI coverage during the entire course of performing the Project services.

5.2.1.4 Contractor shall not perform any Project Services at any time during which required types or amounts of PLI insurance are not in effect, and West- Comm shall have no obligation to pay Contractor for Project Services performed while required PLI insurance is not in effect.

5.2.2 Commercial General Liability Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Commercial General Liability Insurance ( CGL). Coverage shall be at least as broad as ISO Form CG 00 01 written on a per occurrence basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits of no less than One Million Dollars 1,000,000.00) per occurrence and Two Million Dollars ($ 2,000.000.00) in the general aggregate.

The policy shall not contain any endorsements or provisions limiting coverage for (1) contractual liability, ( 2) cross liability exclusion for claims or suits by one insured against another, or ( 3) contain any other exclusion contrary to the Agreement.

5.2.3 Automobile Liability Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Automobile Liability Insurance. Coverage shall be at least as broad as ISO Form CA 00 01 written on a per occurrence basis, covering Code 1 ( any auto), or if the Contractor has no owned autos, Code 8 (hired) and DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 166 of 469 ends

1757507. 1
Code 9 ( non-owned), with limits of no less than One Million Dollars ($ 1,000,000.00) for each occurrence covering bodily injury and property damage.

5.2.4 Workers’ Compensation Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Workers’ Compensation Insurance in at least the minimum statutory amounts, and in compliance with all other statutory requirements, as required by the State of California. Contractor agrees to waive and obtain endorsements from its workers’ compensation insurer waiving all subrogation rights under its workers’ compensation insurance policy against the City, its officials, officers, employees, agents and volunteers, and to require each of its subconsultants and subcontractors, if any, to do likewise under their workers’ compensation insurance policies. Contractor shall also obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Employer’ s Liability Insurance written on a per occurrence basis with limits of at least One Million Dollars 1,000,000.00) per accident for bodily injury or disease. Notwithstanding the foregoing, Contractor shall not be required to procure either Worker’ s Compensation Insurance or Employer’ s Liability Insurance if Contractor provides written verification to the City that Contractor does not have any employees.

5.3 Acceptability of Insurers. Insurance required by this section shall be issued by a licensed company authorized to transact business in the state by the Department of Insurance for the State of California with a current rating of A-:VII or better ( if an admitted carrier), or a current rating of A:X or better ( if offered by a non-admitted insurer listed on the State of California List of Approved Surplus Lines Insurers ( LASLI)), by the latest edition of A.M. Best’ s Key Rating Guide, except that the City will accept workers’ compensation insurance from the State Compensation Fund. In the event the City determines that the work or Project Services to be performed under this Agreement creates an increased or decreased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies may be changed accordingly upon receipt of written notice from the City. Contractor shall immediately substitute any insurer whose A.M. Best rating drops below the levels specified herein.

5.4 Specific Insurance Provisions and Endorsements. Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for written approval. Required insurance policies shall contain the following provisions, or Contractor shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:

5.4.1 CGL and Auto Liability Endorsements. The policy or policies of insurance required by this section for CGL and Automobile Liability Insurance shall be endorsed as follows:

5.4.1.1 Additional Insured. The City, its officials, officers, employees, agents and volunteers, shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Agreement; and

5.4.1.1.1 Additional Insured Endorsements. Additional insured endorsements shall not ( 1) be restricted to “ ongoing operations”, ( 2) exclude “ contractual liability”, ( 3) restrict coverage to “ sole” liability of Contractor, or (4) contain any other exclusions contrary to the Agreement; and, the coverage shall contain no special limitations on the scope of DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 167 of 469 ends

1757507. 1
protection afforded to additional insureds.

5.4.1.2 Primary and Non-Contributing Insurance. Each CGL and Automobile Liability Insurance policy shall be endorsed to be primary, and any other insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees, agents or volunteers, shall not contribute with this primary insurance.

5.4.1.3 Waiver of Subrogation. Each CGL and Automobile Liability Insurance policy shall contain or be endorsed to waive subrogation against the City, its officials, officers, employees, agents and volunteers, or shall specifically allow Contractor or others providing insurance evidence in compliance with the requirements set forth in this section to waive their right to recovery prior to a loss. Contractor hereby agrees to waive its own right of recovery against the City, its officials, officers, employees, agents and volunteers, and Contractor hereby agrees to require similar written express waivers and insurance clauses from each of its subconsultants or subcontractors.

5.4.2 Notice of Cancellation. Each policy of any type shall be endorsed to provide that coverage shall not be suspended, voided, cancelled, or modified, or reduced in coverage or in limits, except after thirty (30) calendar days prior written notice has been provided to the City. Notwithstanding the foregoing, if coverage is to be suspended, voided, or cancelled because of Contractor’ s failure to pay the insurance premium, the notice provided by the insurer to City shall be by not less than ten (10) calendar days prior written notice. (A statement that notice will be provided " in accordance with the policy terms" or words to that effect is inadequate to meet the requirements of this section.)
Deductibles and Self-Insured Retentions. Any deductible or self-insured retention must be approved in writing by the City in advance. The decision whether to approve or withhold approval of a deductible or self-insured retention shall be made by the City in the City's sole and absolute discretion.

5.6 Evidence of Coverage. Concurrently with the execution of the Agreement, Contractor shall deliver certificates of insurance together with original endorsements affecting each of the insurance policies required by this section. Contractor shall promptly furnish, at City’ s request, copies of actual policies including all declaration pages, endorsements, exclusions and any other policy documents City may require to verify coverage.

5.6.1 Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for written approval.

5.6.2 Authorized Signatures. The certificates of insurance and original endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf.

5.6.3 Renewal/ Replacement Policies. At least fifteen ( 15) calendar days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced and not replaced immediately so as to avoid a lapse in the required coverage, Contractor shall, within DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 168 of 469 ends

1757507. 1
ten (10) calendar days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies meeting all requirements of this Agreement.

5.7 Requirements Not Limiting. Requirement of specific coverage or minimum limits contained in this section are not intended as a limitation on coverage, limits, or other requirements, or a waiver of any coverage normally provided by any insurance. Nothing in this section shall be construed as limiting in any way the indemnification provision contained in this Agreement, or the extent to which Contractor may be held responsible for payments of damages to persons or property.

5.8 Enforcement of Agreement ( Non-Estoppel). Contractor acknowledges and agrees that actual or alleged failure on the part of the City to inform Contractor of any noncompliance with any of the insurance requirements set forth in this section imposes no additional obligation on the City nor does it waive any rights hereunder.

5.9 Insurance for Subconsultants. Contractor shall either: ( 1) include all subconsultants or subcontractors engaged in the performance of Project Services on behalf of Contractor as additional named insureds under the Contractor’ s insurance policies; or ( 2) Contractor shall be responsible for causing its subconsultants or subcontractors to procure and maintain the appropriate insurance in compliance with the terms of the insurance requirements set forth in this section, including adding the City, its officials, officers, employees, agents and volunteers, as additional insureds to their respective policies. Contractor shall not allow any subconsultant or subcontractor to commence any work or services relating to this Agreement unless and until it has provided evidence satisfactory to City that the subconsultant or subcontractor has secured all insurance required under this section.

5.10 Other Insurance Requirements. The following terms and conditions shall apply to the insurance policies required of Contractor and its subconsultants and subcontractors, if any, pursuant to this Agreement:

5.10.1 Contractor shall provide immediate written notice to City if (1) any of the insurance policies required herein are terminated, cancelled or suspended, ( 2) the limits of any of the insurance coverages required herein are reduced, or (3) the deductible or self-insured retention is increased.

5.10.2 All insurance coverage and limits provided by Contractor and available or applicable to this Agreement are intended to apply to each insured, including additional insureds, against whom a claim is made or suit is brought to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to the City or its operations shall limit the application of such insurance coverage.

5.10.3 None of the insurance coverages required herein will be in compliance with the requirements of this section if they include any limiting endorsement which substantially impairs the coverages set forth herein ( e.g., elimination of contractual liability or reduction of discovery period), unless the endorsement has first been submitted to the City and approved in DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 169 of 469 ends

1757507. 1
writing.

5.10.4 Certificates of insurance will not be accepted in lieu of required endorsements, and submittal of certificates without required endorsements may delay commencement of the Project. It is Contractor’ s obligation to ensure timely compliance with all insurance submittal requirements as provided herein.

5.10.5 Contractor agrees to ensure that subconsultants and subcontractors, if any, and any other parties involved with the Project who are brought onto or involved in the Project by Contractor, provide the same minimum insurance coverage required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and others engaged in the provision of Project Services will be submitted to the City for review.

5.10.6 Contractor agrees to provide immediate written notice to City of any claim, demand or loss against Contractor arising out of the work or Project Services performed under this Agreement and for any other claim, demand or loss which may reduce the insurance available to pay claims, demands or losses arising out of this Agreement.

6. INDEMNIFICATION
To the fullest extent permitted by law, Contractor shall defend ( at Contractor’ s sole cost and expense with legal counsel reasonably acceptable to City), indemnify and hold the City, its officials, officers, employees, agents and volunteers, free and harmless from any and all claims, demands, orders, causes of action, costs, expenses, liabilities, losses, penalties, judgments, arbitration awards, settlements, damages or injuries of any kind, in law or in equity, including but not limited to property or persons, including wrongful death, ( collectively “ Claims”) in any manner arising out of, pertaining to, related to, or incident to any alleged acts, errors or omissions, or willful misconduct of Contractor, its officers, directors, employees, subconsultants, subcontractors, agents or invitees in connection with performance under this Agreement, or in any manner arising out of, pertaining to, related to, or incident to an alleged breach of this Agreement, including without limitation the payment of all consequential damages, expert witness fees and attorneys’ fees and other related costs and expenses.

Notwithstanding the foregoing, and only to the extent that the Project Services performed by Contractor are subject to California Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.

Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit Contractor’ s indemnification obligation or other liability hereunder. Notwithstanding the foregoing, such obligation to defend, hold harmless and indemnify the City, its officials, officers, employees, agents and volunteers, shall not apply to the extent that such Claims are caused by the sole negligence or willful misconduct of that indemnified party.

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 170 of 469 ends

1757507. 1

7. REPORTS AND RECORDS

7.1 Records. Contractor shall keep complete, accurate, and detailed accounts of all time, costs, expenses, and expenditures pertaining in any way to this Agreement. Contractor shall keep such books and records as shall be necessary to properly perform the Project Services required by this Agreement and to enable the Contract Officer to evaluate the performance of such Project Services. The Contract Officer shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records.

7.2 Reports. Contractor shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the Project Services as the Contract Officer shall require.

7.3 Ownership of Documents. All drawings, specifications, reports, records, documents, memoranda, correspondence, computations, and other materials prepared by Contractor, its employees, subconsultants, subcontractors and agents in the performance of this Agreement shall be the property of City and shall be promptly delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership of the documents and materials hereunder. Contractor may retain copies of such documents for its own use. Contractor shall have an unrestricted right to use the concepts embodied therein. Contractor shall ensure that all of its subconsultants and subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all damages resulting therefrom.

7.4 Release of Documents. Except to the extent otherwise required by law, no drawing, specification, report, record, document, or other material prepared by Contractor, its employees, subconsultants, subcontractors and agents in the performance of Project Services shall not be released publicly without the prior written approval of the Contract Officer.

8. ENFORCEMENT OF AGREEMENT

8.1 California Law and Venue. This Agreement shall be construed and interpreted both as to validity and as to performance of the Parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim, or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Orange, State of California, or any other appropriate court in such County, and Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action.

8.2 Waiver. No delay or omission in the exercise of any right or remedy of a nondefaulting Party on any default shall impair such right or remedy or be construed as a waiver. No consent or approval of City shall be deemed to waiver or render unnecessary City’ s consent to or approval of any subsequent act of Contractor. Any waiver by either Party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 171 of 469 ends

1757507. 1

8.3 Rights and Remedies Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other Party.

8.4 Legal Action. In addition to any other rights or remedies, either Party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement.

8.5 Termination Prior to Expiration of Term. City reserves the right to terminate this Agreement, at any time, with or without cause, upon thirty ( 30) calendar days written notice to Contractor, except that where the continuation of services would constitute a danger to health, safety or general welfare, the period of notice shall be such shorter time as may be appropriate.

Upon receipt of the notice of termination, Contractor shall immediately cease all Project Services, except as may be specifically approved by the Contract Officer. Contractor shall be entitled to compensation for all Project Services rendered prior to receipt of the notice of termination and for any Project Services authorized by the Contract Officer thereafter.

8.6 Termination for Default of Contractor.

8.6.1 Contractor’ s failure to comply with any provision of this Agreement shall constitute a default.

8.6.2 If the Contract Officer determines that Contractor is in default in the performance of any of the terms or conditions of this Agreement, he/she shall notify Contractor in writing of such default. If such default is capable of being cured, Contractor shall have ten ( 10) calendar days, or such longer period as City may designate, to cure the default by rendering satisfactory performance. In the event Contractor fails to cure its default within such period of time, or if such default is not capable of being cured, City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice of any remedy to which City may be entitled at law, in equity, or under this Agreement. Contractor shall be liable for any and all reasonable costs incurred by City as a result of such default. Compliance with the provisions of this section shall not constitute a waiver of any City right to take legal action in the event that the dispute is not cured, provided that nothing herein shall limit City’ s right to terminate this Agreement without cause pursuant to Section 8.5.

8.6.3 If termination is due to the failure of Contractor to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 8.6.2, take over the Project Services and prosecute the same to completion by contract or otherwise, and Contractor shall be liable to the extent that the total direct and indirect costs for completion of the Project Services required hereunder exceeds the Maximum Contract Amount, and City may withhold any payments to Contractor for the purpose of set-off toward the cost of completion of the Project Services. The withholding or failure to withhold payments to Contractor shall not limit Contractor’ s liability for completion of the Project Services as provided herein.

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 172 of 469 ends

1757507. 1

8.7 Attorneys’ Fees. In the event any dispute between the Parties with respect to this Agreement results in litigation or any non-judicial proceeding, the prevailing Party shall be entitled, in addition to such other relief as may be granted, to recover from the non-prevailing Party all reasonable costs and expenses, including but not limited to reasonable attorneys’ fees, expert witness fees, court costs and all fees, costs, and expenses incurred in any appeal or in collection of any judgment entered in such proceeding. To the extent authorized by law, in the event of a dismissal by the plaintiff or petitioner of the litigation or non-judicial proceeding within thirty (30) calendar days of the date set for trial or hearing, the other Party shall be deemed to be the prevailing Party in such litigation or proceeding. For purposes of this section, " Reasonable attorney fees" shall be calculated by multiplying the actual number of hours reasonably expended by the attorney( s) handling the dispute on behalf of the prevailing Party by the hourly rate actually paid by the prevailing Party, but in no case shall the hourly rate exceed Two Hundred and Fifty Dollars 250.00) per hour.

9. CITY OFFICERS AND EMPLOYEES: NON- DISCRIMINATION

9.1 Non-liability of City Officers and Employees. No officer or employee of the City shall be personally liable to the Contractor, or any successor- in-interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms of this Agreement.

9.2 Covenant Against Discrimination. Contractor covenants that, by and for itself, its heirs, executors, assigns, subcontractors, subconsultants and all persons claiming under or through them, that there shall be no discrimination or segregation in the performance of or in connection with this Agreement regarding any person or group of persons on account of race, disability, medical condition, color, creed, religion, sex, sexual orientation, marital status, age, national origin, or ancestry. Contractor shall take affirmative action to insure that applicants and employees are treated without regard to their race, disability, medical condition, color, creed, religion, sex, sexual orientation, marital status, national origin, or ancestry.

10. MISCELLANEOUS PROVISIONS

10.1 Notices. Any notice, demand, request, consent, approval, or communication either Party desires or is required to give to the other Party or any other person shall be in writing and either served personally during normal hours of operation of the Party receiving the notice, or sent by pre-paid, first-class mail to the address set forth below. Either Party may change its address by notifying the other Party of the change of address in writing. Notice shall be deemed communicated on the day personally served, or two (2) business days from the date of mailing if mailed as provided in this section. Additionally, notices by email will be considered legal notice if such communications include the following text in the Subject field: FORMAL LEGAL NOTICE – Charles Abbott Associates, Inc.

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 173 of 469 ends

1757507. 1
To City: Chet Simmons, City Manager
City of Los Alamitos
3191 Katella Ave.

Los Alamitos, CA 90720
csimmons@cityoflosalamitos. org
With copy to:

Michael S. Daudt,
City Attorney
Woodruff, Spradlin & Smart
555 Anton Blvd., Suite 1200
Costa Mesa, CA 92626
mdaudt@wss- law.com
To Contractor: Mark Abbott, CBO
27201 Puerta Real, # 200
Mission Viejo, CA92691
markabbott@caa. inc

10.2 Entire Agreement; Amendments in Writing. This Agreement constitutes the entire agreement between the Parties and is intended as an integrated agreement, superseding all prior negotiations, arrangements, agreements, representations, and understandings, if any, made by or among the Parties with respect to the subject matter hereof. No amendments or other modifications of this Agreement shall be binding unless executed in writing by both Parties hereto, or their respective successors, assigns, or grantees.

10.3 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement, which shall be interpreted to carry out the intent of the Parties hereunder.

10.4 Successors in Interest. This Agreement shall be binding upon and inure to the benefit of the Parties’ successors and assignees.

10.5 Third Party Beneficiary. Except as expressly provided herein, nothing contained in this Agreement is intended to confer, nor shall this Agreement be construed as conferring, any rights, including, without limitation, any rights as a third-party beneficiary or otherwise, upon any entity or person not a party hereto.

10.6 Recitals. The above- stated Recitals are hereby incorporated into the Agreement as though fully set forth herein and each Party acknowledges and agrees that such Party is bound, for purposes of this Agreement, by the same.

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 174 of 469 ends

1757507. 1

10.7 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“ Prevailing Wage Laws”). Contractor agrees to fully comply with all applicable federal and state labor laws (including, without limitation, if applicable, the Prevailing Wage Laws). It is agreed by the Parties that, in connection with the work or Project Services provided pursuant to this Agreement, Contractor shall bear all risks of payment or non-payment of prevailing wages under California law, and Contractor hereby agrees to defend, indemnify, and hold the City, its officials, officers, employees, agents and volunteers, free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The foregoing indemnity shall survive termination of this Agreement.

10.8 Corporate Authority. Each of the undersigned represents and warrants that (i) the Party for which he/she is executing this Agreement is duly authorized and existing, ( ii) he/she is duly authorized to execute and deliver this Agreement on behalf of the Party for which he/she is signing, ( iii) by so executing this Agreement, the Party for which he/she is signing is formally bound to the provisions of this Agreement, and ( iv) the entering into this Agreement does not violate any provision of any other agreement to which the Party for which he/she is signing is bound.

SIGNATURES ON NEXT PAGE]
DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 175 of 469 ends

1757507. 1
IN WITNESS WHEREOF, the Parties have executed and entered into this Agreement as of the date first written above.

City”
City of Los Alamitos
By:

Tanya Doby
Mayor
APPROVED AS TO FORM.

Woodruff, Spradlin & Smart, APC
By:

Michael S. Daudt
City Attorney
ATTEST:

By:

Windmera Quintanar, MMC
City Clerk
Contractor”
Name of Contractor
By:

Mark Abbott
CBO
markabbott@caa. inc
By:

Rusty R. Reed
President
rustyreed@caa. inc
DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01 3/ 28/ 2023
3/ 29/ 2023
3/ 29/ 2023
3/ 29/ 2023
3/ 29/ 2023

Page 176 of 469 ends

1757507. 1
EXHIBIT “ A”
1277023. 1
DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 177 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 178 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 179 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 180 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 181 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 182 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 183 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 184 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 185 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 186 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 187 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 188 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 189 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 190 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 191 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 192 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 193 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 194 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 195 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 196 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 197 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 198 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 199 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 200 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 201 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 202 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 203 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 204 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 205 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 206 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 207 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 208 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 209 of 469 ends

DocuSign Envelope ID: A4DD09AB- D957-486D-93D0-DBECB2FD8F01

Page 210 of 469 ends

City of Los Alamitos

CITY COUNCIL AGENDA REPORT
MEETING DATE: May 26, 2026 ITEM NUMBER: 11H
To: Mayor Tanya Doby & Members of the City Council
Presented By: Ron Noda, Assistant City Manager/Development Services Director Britney Ramirez, Senior Management Analyst
Subject:

Amendment No. 1 to Professional Services Agreement (PSA) with Willdan Engineering for City Engineering and Traffic Engineering Services

SUMMARY
The existing Professional Services Agreement (PSA) with Willdan Engineering for City Engineering and Traffic Engineering services expires on June 30, 2026. The agreement includes provisions for term extensions, as previously authorized by the City Council. This item requests City Council approval of Amendment No. 1 to extend the term of the agreement for an additional two (2) years and approve a 4% increase to the fee schedule of hourly rates, while the scope of services remains unchanged.

RECOMMENDATION
Authorize the Mayor to execute Amendment No. 1 to the Professional Services Agreement (PSA) with Willdan Engineering to extend the term of the agreement through June 30, 2028.

BACKGROUND
The City maintains a Professional Services Agreement with Willdan Engineering to provide City Engineering and Traffic Engineering services. These services include consultation on City utilities and facilities, review and coordination of development projects and permits, management of the City’s Capital Improvement Program (CIP), permit review and inspection services, and technical support related to traffic signals, street lighting, traffic control devices, and the issuance of encroachment and oversized load permits. On March 20, 2023, the City Council awarded the agreement following a competitive Request for Proposals (RFP No. 2022- 05) process. The agreement established an initial three-year term with two (2) optional twoyear extensions.

DISCUSSION

Page 211 of 469 ends

The current Professional Services Agreement expires on June 30, 2026. The agreement includes provisions for up to two (2) additional two-year extensions, subject to City Council approval.

Continuation of the Willdan City Engineering and Traffic Engineering services and assistance is an important part of the ongoing operations, regulatory requirements, and the delivery of capital improvement projects. The consultant offers the technical knowledge, professional engineering licenses, and expertise needed to perform services and meet expectations at a high level. Additionally, Willdan can provide the institutional knowledge and familiarity with the City’s standards, systems, and active projects. Extending the agreement will ensure continuity of services and support the efficient delivery of ongoing operations and projects.

Amendment No. 1 will extend the agreement's term for 2 years, through June 30, 2028, with no changes to the scope of services. The firm has maintained its billing rates for the past three years without any increases; however, at this time, Willdan is requesting a 4% adjustment to the approved fee schedule to account for rising labor and operating costs. This 4% increase is a one-time rate adjustment applied with the approval of this amendment and is not an annual increase. The updated fee schedule reflecting this single adjustment is included as an attachment to the amendment.

FISCAL IMPACT
Services will continue to be funded through the Development Services Department for each fiscal year, including the funds already programmed in the Fiscal Year 2026–27 Development Services budget. Funding for these services is supported not only by General Fund allocations but also by transportation and capital improvement project sources. The approved budget is not expected to increase as a result of this amendment. However, the one-time 4% adjustment to the fee schedule may affect total expenditures, depending on the volume of services used.

Attachment: 1. Willdan Engineering - Amendment 1

2. Exhibit A - Fee Schedule

3. Willdan Engineering (2023)

Page 212 of 469 ends
Page 1 of 4 ends

4936-1592-5927, v. 1
AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT
[Willdan Engineering]
This Amendment No. 1 to Professional Services Agreement (“Amendment”) is made and entered into on this 1st day of July 2026 by and between the CITY OF LOS ALAMITOS, a California charter city and municipal corporation (“City”) and WILLDAN ENGINEERING, a California corporation, (“Contractor”). City and Contractor are sometimes hereinafter collectively referred to as the “Parties.”

RECITALS
A. City and Contractor entered into that certain Professional Services Agreement for City Engineering and Traffic Engineering Services including but not limited to consultation on City utilities and facilities, consultation on development projects/permits, lead and manage the City’s Capital Improvement Program (CIP), provide permit review and inspection services, and technical expertise regarding traffic signals, street lighting, traffic signs, and the issuance of encroachment and wide-load permits on, March 20, 2023 (“Agreement”), which is incorporated herein by this reference.

B. The initial term of the Agreement will expire on June 30, 2026, unless extended. Section 3.4 of the Agreement provides for up to two possible two-year extensions exercisable at the sole discretion of the City.

C. City and Contractor desire to exercise the first of two options to extend the term of the Agreement for two (2) additional years, subject to the terms and provisions of this Amendment.

NOW, THEREFORE, City and Contractor mutually agree as follows:

1. Section 2.1 of the Agreement is hereby amended and restated in its entirety to read as follows:
“2.1 Hourly Rates. Contractor shall be compensated for the Project Services performed between the Effective Date and June 30, 2026 in accordance with Exhibit “A”, and thereafter in accordance Exhibit “A-1” for the period ending on June 30, 2028 .”

2. Section 3.4 of the Agreement is hereby amended and restated in its entirety to read as follows:
“3. 4 Term. Unless earlier terminated as provided elsewhere in this Agreement, this Agreement shall commence upon the Effective Date and shall continue in full force and effect for a period of five (5) years ending on June 30, 2028. The Agreement may be renewed for one (1) additional term of two (2) years,

Page 213 of 469 ends
Page 2 of 4 ends

4936-1592-5927, v. 1
at the sole discretion of the City, for a maximum possible term ending on June 30, 2030.”

3. The City of Los Alamitos Professional Services Agreement Extension Cost Proposal, attached hereto, is hereby appended to and made a part of the Agreement as Exhibit “A-1”.

4. Except as expressly modified above, all terms and conditions of the Agreement shall remain unchanged and in full force and effect.

5. The persons executing this Amendment on behalf of the Parties warrant that they are duly authorized to execute this Amendment on behalf of said Parties and that by so executing the Parties are formally bound to the provisions of this Amendment.

IN WITNESS WHEREOF, the Parties have executed and entered into this Amendment as of the date first written above.
“City”
City of Los Alamitos
By:_______________________________
Tanya Doby
Mayor
APPROVED AS TO FORM.

Woodruff & Smart, APC
By:__________________________________
Michael S. Daudt
City Attorney
ATTEST:

By:_______________________________
Windmera Quintanar, MMC
City Clerk
“Contractor”
Willdan Engineering
By:_______________________________
Vanessa Munoz

Page 214 of 469 ends
Page 3 of 4 ends

4936-1592-5927, v. 1
President
[email protected]
By:_______________________________
Adel M. Freij, PE
Principal Engineer
[email protected]

Page 215 of 469 ends
Page 4 of 4 ends

4936-1592-5927, v. 1
EXHIBIT A-1
CONTRACTOR’S UPDATED FEE SCHEDULE (4/29/2026)

Page 216 of 469 ends

City of Los Alamitos
Professional Services Agreement Extension
Cost Proposal
As requested, we are pleased to provide the hourly rates below. A detailed hourly rate schedule is also attached. These rates reflect a reduction from our standard fee schedule in recognition of our longstanding working relationship with the City of Los Alamitos.

Job Description Hourly Rate
City Engineer $166
Geotechnical Manager $192
Landscape Architect $182
Labor Compliance Manager $171
Traffic Engineer $166
Project Manager $164
Public Works Superintendent $156

Page 217 of 469 ends

WILLDAN ENGINEERING
Schedule of Hourly Rates
Effective July 1, 2026 to June 30,2027
** For Non-Prevailing Wage Project *** For Prevailing Wage Project Mileage/Field Vehicle usage will be charged at the rate in accordance with the current FTR mileage reimbursement rate, subject to negotiation.

Additional billing classifications may be added to the above listing during the year as new positions are created. Consultation in connection with litigation and court appearances will be quoted separately.

The above schedule is for straight time. Overtime will be charged at 1.5 times, and Sundays and holidays, 2.0 times the standard rates. Blueprinting, reproduction, messenger services, and printing will be invoiced at cost plus fifteen percent (15%). A sub consultant management fee of fifteen percent (15%) will be added to the direct cost of all sub consultant services to provide for the cost of administration, consultation, and coordination. Valid July 1, 2026 thru June 30, 2027, thereafter, the rates may be raised once per year to the value between the 12-month % change of the Consumer Price Index for the Los Angeles/Orange County/Sacramento/San Francisco/San Jose area and five percent. For prevailing wage classifications, the increase will be per the prevailing wage increase set by the California Department of Industrial Relations.

Updated 04.15.2026

DESIGN ENGINEERING
Technical Aide $86
Technical Aide II $110
Technical Aide III $128
CAD Operator I $136
CAD Operator II $158
CAD Operator III $176
GIS Analyst I $169
GIS Analyst II $185
GIS Analyst III $193
Environmental Analyst I $154
Environmental Analyst II $171
Environmental Analyst III $183
Environmental Specialist $197
Designer I $180
Designer II $187
Senior Designer I $196
Senior Designer II $205
Design Manager $212
Senior Design Manager $219
Plans Reviewer I $160
Plans Reviewer II $178
Senior Plans Reviewer $195
Project Manager I $206
Project Manager II $229
Project Manager III $248
Project Manager IV $264
Principal Project Manager $277
Assistant Engineer I $151
Assistant Engineer II $165
Assistant Engineer III $175
Assistant Engineer IV $186
Associate Engineer I $195
Associate Engineer II $204
Associate Engineer III $209
Senior Engineer I $212
Senior Engineer II $217
Senior Engineer III $220
Senior Engineer IV $224
Supervising Engineer $238
Traffic Engineer I $238
Traffic Engineer II $266
City Engineer I $254
City Engineer II $266
Deputy Director $284
Director $300
Principal Engineer $342

BUILDING AND SAFETY
Code Enforcement Technician $113
Code Enforcement Officer $129
Senior Code Enforcement Officer $152
Supervisor Code Enforcement $184
Fire Plans Examiner $184
Senior Fire Plans Examiner $201
Fire Inspector $169
Senior Fire Inspector $184
Fire Marshal $217
Plans Examiner Aide $121
Plans Examiner $184
Senior Plans Examiner $201
Assistant Construction Permit
Specialist
$129
Construction Permit Specialist $135
Senior Construction Permit Specialist $160
Supervising Construction Permit
Specialist
$169
Assistant Building Inspector $152
Building Inspector $169
Senior Building Inspector $184
Supervising Building Inspector $201
Inspector of Record $215
Assistant Building Official $191
Deputy Building Official $218
Building Official $228
Plan Check Engineer $211
Supervising Plan Check Engineer $213
Principal Project Manager $277
Deputy Director $284
Director $300

PLANNING
CDBG Technician $100
CDBG Specialist $118
CDBG Analyst $136
Sr. CDBG Analyst $145
CDBG Coordinator $161
CDBG Manager $194
Housing Specialist $143
Housing Program Coordinator $161
Planning Technician $139
Assistant Planner $173
Associate Planner $187
Senior Planner $213
Principal Planner $222
Planning Manager $235
Deputy Director $284
Director $300

CONSTRUCTION SERVICES
Labor Compliance Specialist $155
Senior Labor Compliance
Specialist
$170
Assistant Labor Compliance
Manager
$186
Labor Compliance Manager $206
Utility Coordinator $178
Office Engineer I $156
Office Engineer II $170
Assistant Construction Manager $178
Construction Manager $197
Senior Construction Manager $214
Resident Engineer I $222
Resident Engineer II $230
Project Manager IV $264
Deputy Director $284
Director $300

INSPECTION SERVICES
Public Works Observer ** $140
Public Works Observer *** $179
Senior Public Works Observer** $152
Senior Public Works Observer *** $179

MAPPING AND EXPERT SERVICES
Survey Analyst I $156
Survey Analyst II $180
Senior Survey Analyst $193
Supervisor - Survey & Mapping $216
Principal Project Manager $277

LANDSCAPE ARCHITECTURE
Assistant Landscape Architect $162
Associate Landscape Architect $187
Senior Landscape Architect $205
Principal Landscape Architect $218
Principal Project Manager $277

ADMINISTRATIVE
Administrative Assistant I $108
Administrative Assistant II $130
Administrative Assistant III $152
Project Accountant I $122
Project Accountant II $143
Project Controller I $152
Project Controller II $172

Page 218 of 469 ends

1 PROFESSIONAL SERVICES AGREEMENT
City Engineering and Traffic Engineering Services
RFP) 2022- 05
Willdan Engineering]
THIS PROFESSIONAL SERVICES AGREEMENT (“ Agreement”) is made and entered into, to be effective this day of March 20, 2023 (“ Effective Date”), by and between the CITY OF LOS ALAMITOS, a California charter city and municipal corporation, (“ City”) and WILLDAN ENGINEERING, (“ Contractor”) a California corporation. City and Contractor are sometimes hereinafter individually referred to as “ Party” and are hereinafter collectively referred to as the Parties.”

RECITALS
A. City has determined that it requires the services of a qualified contractor to provide City Engineering and Traffic Engineering Services including but not limited to consultation on City utilities and facilities, consultation on development projects/ permits, lead and manage the City’ s Capital Improvement Program ( CIP), provide permit review and inspection services, and technical expertise regarding traffic signals, street lighting, traffic signs, and the issuance of encroachment and wide-load permits.

B. In response to City’ s formal Request for Proposals No. 2022- 05 ( RFP), dated November 14, 2022, Contractor has submitted to City a written proposal, dated January 12, 2023, to provide the desired services.

C. City desires to engage Contractor to provide such services subject to the terms and conditions set forth in this Agreement.

NOW, THEREFORE, in consideration of the promises and mutual obligations, covenants, and conditions contained herein, and other valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows:

AGREEMENT

1. SERVICES OF CONTRACTOR

1.1 Scope of Services and Standard of Performance. Contractor shall provide those services set forth in the City Engineering and Traffic Engineering Services for Development Services Department Proposal, dated January 12, 2023, attached hereto as Exhibit “ A” (“Scope of Services” and/or “ Project Services”). Contractor shall provide the Project Services in compliance with all terms and conditions of this Agreement. Contractor warrants that all Project Services shall be performed in a skillful, competent, professional and satisfactory manner in accordance with all standards prevalent in the same profession in the State of California. Contractor represents and warrants that it and all employees, subcontractors and subconsultants providing any services pursuant to this Agreement shall have sufficient skill and experience to perform the Project Services. All Project Services shall be completed to the reasonable satisfaction of City.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 219 of 469 ends

2 1.1.1 Contract Documents. This Agreement shall consist of the following: ( 1) the main body of this Agreement; ( 2) RPF No. 2022- 05, dated November 14, 2022; and ( 3) Contractor’ s Proposal, Exhibit “ A”. Should any conflict or inconsistency exist in the Contract Documents, the conflict or inconsistency shall be resolved by applying the provisions in the highest priority document, which shall be determined in the following order of priority: ( 1st) the main body of this Agreement; ( 2rd) the RFP, and ( 3rd) Contractor’ s Proposal.

1.2 Compliance with Law. All Project Services shall be provided in accordance with all laws, ordinances, resolutions, statutes, rules, and regulations of City and any federal, state or local governmental agency of competent jurisdiction. Contractor shall be liable for all violations of such laws, ordinances, resolutions, statutes, rules and regulations in connection with performance of the Project Services. If Contractor performs any Project Services in violation of such laws, ordinances, resolutions, statutes, rules or regulations, Contractor shall be solely responsible for all penalties and costs arising therefrom. Contractor shall defend, indemnify, and hold City, its officials, officers, employees, agents and volunteers, free and harmless from and against any claim or liability arising out of any failure or alleged failure to comply with such laws, ordinances, resolutions, statutes, rules or regulations.

1.3 Licenses and Permits. Prior to performing any Project Services, Contractor shall obtain all licenses, permits, qualifications, and approvals of whatever nature that are legally required to practice its profession and perform the Project Services. Contractor represents and warrants to City that Contractor shall, at its sole cost and expense, keep in effect at all times during the term of this Agreement and any extension, any license, permit, qualification, or approval that is legally required for Contractor to perform the Project Services. Contractor shall have the sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Contractor' s performance of the Project Services, and shall defend, indemnify, and hold the City, its officials, officers, employees, agents and volunteers, free and harmless from and against any claim or liability arising out of any failure or alleged failure to obtain such license, permits, qualifications, and approvals of whatever nature that are legally required to practice its profession and perform the Project Services.

1.4 Familiarity with Work. By executing this Agreement, Contractor warrants that Contractor ( a) has thoroughly investigated and considered the Project Services to be performed, b) has carefully considered how the Project Services should be performed, and ( c) fully understands the facilities, difficulties and restrictions attending performance of the Project Services under this Agreement.

1.5 Care in Performance of Project Services. Contractor shall adopt reasonable methods during the term of the Agreement to prevent losses or damage to materials, papers or other components of the Project Services, and shall be responsible for all such damages, to persons or property, until acceptance of the Project Services by the City, except such losses or damages as may be caused by City's own negligence.

1.6 Non-Exclusive Agreement. Contractor acknowledges that City may enter into agreements with other Contractors, consultants, individuals, or vendors for services similar to the services that are the subject of this Agreement. Contractor further acknowledges that City may have its own employees perform services similar to the services that are the subject of this DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 220 of 469 ends

3 Agreement.

2. COMPENSATION

2.1 Hourly Rates. Contractor shall be compensated for the Project Services performed, including authorized reimbursements, if any, in accordance with the hourly rates and charges set forth in the Scope of Services.

2.2 Method of Payment. In any month in which Contractor wishes to receive payment, Contractor shall no later than first working day of such month, submit to the City, in a form approved by the City Manager or his designee, an invoice for services rendered prior to the date of the invoice. Such requests shall be based upon the amount and value of the services performed by Contractor and accompanied by such reporting data including an itemized breakdown of all costs incurred and tasks performed during the period covered by the invoice, as may be required by the City. Within thirty (30) calendar days of receipt of invoice, City shall pay all undisputed amounts included on the invoice.

2.3 Changes in Scope. In the event any change or changes in the Scope of Services is requested by the City, the Parties shall execute a written amendment to this Agreement, signed by an individual authorized to formally bind the Party for which he/she is signing, setting forth with particularity all terms of such amendment, including, but not limited to, any additional professional fees. An amendment may be entered into: ( a) to provide for revisions or modifications to documents or other work product when documents or other work product or work is required by the enactment or revision of law subsequent to the preparation of any documents, other work product, or work; and/or, (b) to provide for additional services not included in this Agreement or not customarily furnished in accordance with generally accepted practice in Contractor’ s profession.

2.4 Appropriations. This Agreement is subject to and contingent upon funds being appropriated therefore by the Los Alamitos City Council for each fiscal year covered by the term of this Agreement. If such appropriations are not made, this Agreement shall automatically terminate without penalty to the City.

3. SCHEDULE OF PERFORMANCE

3.1 Time of Essence. Time is of the essence in the performance of this Agreement.

The time for completion of the Project Services to be performed by Contractor is an essential condition of this Agreement.

3.2 Schedule of Performance. Contractor shall prosecute regularly and diligently the Project Services according to the periods specified in the Scope of Services. When requested by Contractor, extensions of the time period( s) specified in the Scope of Services may be approved in writing by the Contract Officer; however, the City shall not be obligated to grant any such extension.

3.3 Force Majeure. The time for performance of the Project Services may be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor ( financial inability excepted), including, but not limited to, acts of DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 221 of 469 ends

4 God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, and/or acts of any governmental agency, including the City, if Contractor, within ten ( 10) calendar days of the commencement of such delay, notifies the City Manager in writing of the causes of the delay. The City Manager shall ascertain the facts and the extent of delay, and extend the time for performing the Services for the period of the enforced delay when and if in the judgment of the City Manager such delay is justified. The City Manager' s determination shall be final and conclusive upon the Parties to this Agreement. In no event shall Contractor be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Contractor' s sole remedy being extension of the Agreement pursuant to this section.

3.4 Term. Unless earlier terminated as provided elsewhere in this Agreement, this Agreement shall commence upon the Effective Date and shall continue in full force and effect for an initial period of three ( 3) years, ending on July 1, 2026, with two (2) possible - two (2) year extensions at the sole discretion for renewal by the City, ending on March 20, 2030.

4. COORDINATION OF PROJECT SERVICES

4.1 Contractor’ s Representative. The following principal of Contractor is hereby designated as being the principal and representative of Contractor authorized to act on its behalf with respect to the Project Services and to make all decisions in connection therewith: Vanessa Munoz. It is expressly understood that the experience, knowledge, education, capability, expertise, and reputation of the foregoing principal is a substantial inducement for City to enter into this Agreement. Therefore, the foregoing principal shall be responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to personally supervise the Project Services performed hereunder. The foregoing principal may not be changed by Contractor without prior written approval of the Contract Officer.

4.2 City’ s Contract Officer. The City’ s Contract Officer shall be such person as may be designated by the City Manager, and is subject to change by the City Manager. It shall be the Contractor' s responsibility to ensure that the Contract Officer is kept fully informed of the progress of the performance of the Project Services, and the Contractor shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.

4.3 Prohibition Against Subcontracting or Assignments. The experience, knowledge, capability, expertise, and reputation of Contractor, its principals and employees, were a substantial inducement for City to enter into this Agreement. Therefore, Contractor shall not assign the performance of this Agreement, nor any part thereof, nor any monies due hereunder, voluntarily or by operation of law, without the prior written consent of City. Contractor shall not contract with any other entity to perform the Project Services without prior written consent of City.

If Contractor is permitted by City to subcontract any part of this Agreement, Contractor shall be responsible to City for the acts and omissions of its subcontractor( s) in the same manner as it is for persons directly employed. Nothing contained in this Agreement shall create any contractual relationships between any subcontractor and City. All persons engaged in the performance of DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 222 of 469 ends

5 Project Services will be considered employees of Contractor. City will deal directly with and will make all payments to Contractor. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written consent of City.

Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent ( 25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release Contractor or any surety of Contractor from any liability hereunder without the express written consent of City.

4.4 Independent Contractor.

4.4.1 The legal relationship between the Parties is that of an independent contractor; nothing herein shall be deemed to make Contractor a City employee. During the performance of this Agreement, Contractor and its officers, employees, and agents shall act in an independent capacity and shall not act as City officers or employees. Contractor will determine the means, methods and details of performing the Project Services subject to the requirements of this Agreement. The personnel performing the Project Services on behalf of Contractor shall at all times be under Contractor’ s exclusive direction and control. Neither City nor any of its officials, officers, employees, agents or volunteers shall have control over the conduct of Contractor or any of its officers, employees, or agents, except as set forth in this Agreement. Contractor, its officers, employees or agents, shall not maintain a permanent office or fixed business location at City’ s offices. City shall have no voice in the selection, discharge, supervision, or control of Contractor’ s officers, employees, or agents or in fixing their number, compensation, or hours of service.

Contractor shall pay all wages, salaries, and other amounts due its employees in connection with the performance of Project Services and shall be responsible for all reports and obligations respecting them, including but not limited to social security income tax withholding, unemployment compensation, workers’ compensation, and other similar matters. City shall not in any way or for any purpose be deemed to be a partner of Contractor in its business or otherwise a joint venturer or a member of any joint enterprise with Contractor.

4.4.2 Contractor shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner.

4.4.3 No City benefits shall be available to Contractor, its officers, employees, representatives, agents, subconsultants or subcontractors in connection with the performance of any Project Services. Except for fees paid to Contractor as provided for in this Agreement, City shall not pay salaries, wages, or other compensation to Contractor for the performance of any Project Services. City shall not be liable for compensation or indemnification to Contractor, its officers, employees, representatives, agents, subconsultants or subcontractors, for injury or sickness arising out of the performance of any Project Services. If for any reason any court or governmental agency determines that the City has financial obligations, other than pursuant to Section 2 herein, of any nature relating to salary, taxes, or benefits of Contractor’ s officers, employees, representatives, agents, or subconsultants or subcontractors, Contractor shall defend, indemnify, and hold harmless City from and against all such financial obligations.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 223 of 469 ends

6 4.5 PERS Eligibility Indemnification.

4.5.1 In the event that Contractor or any officer, employee, representative, agent, subconsultant or subcontractor of Contractor providing any Project Services claims or is determined by a court of competent jurisdiction or the California Public Employee Retirement System ( PERS) to be eligible for enrollment in PERS as an employee of the City, Contractor shall indemnify, defend, and hold harmless City against ( 1) all such claims and determinations, ( 2) for the payment of any employee and/or employer contributions for PERS benefits on behalf of Contractor or its officers, employees, representatives, agents, subconsultants or subcontractors, and (3) the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of the City.

4.5.2 Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Contractor and any of its officers, employees, representatives, agents, subconsultants or subcontractors providing any Project Services shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

5. INSURANCE

5.1 Compliance with Insurance Requirements. Contractor shall obtain, maintain, and keep in full force and effect during the term of this Agreement, at its sole cost and expense, and in a form and content satisfactory to City, all insurance required under this section. Contractor shall not commence any Project Services unless and until it has provided evidence satisfactory to City that it has secured all insurance required under this section. If Contractor’ s existing insurance policies do not meet the insurance requirements set forth herein, Contractor agrees to amend, supplement or endorse the policies to do so.

5.2 Types of Insurance Required. As a condition precedent to the effectiveness of this Agreement, and without limiting the indemnity provisions set forth in this Agreement, Contractor shall obtain and maintain in full force and effect during the term of this Agreement, including any extension thereof, the following policies of insurance:

5.2.1 Professional Liability/ Errors and Omissions Insurance (" PLI").

Contractor shall obtain and maintain a policy of Professional Liability or Errors and Omissions Insurance appropriate to Contractor’ s profession with per-claim and aggregate limits of no less than Two Million Dollars ($2,000,000.00). Covered professional services shall specifically include all Project Services to be performed under the Agreement and the policy shall be endorsed to delete any exclusions that may exclude coverage for claims within the minimum PLI limits set forth herein for the Project Services to be performed under this Agreement.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 224 of 469 ends

7 5.2.1.1 The PLI policy shall be endorsed to delete any Contractual Liability Exclusion. The PLI shall include contractual liability coverage applicable to this Agreement. The policy must “ pay on behalf of” the insured, and include a provision establishing the insurer’ s duty to defend the insured.

5.2.1.2 If the PLI policy is written on a “ claims- made” basis, the policy shall be continued in full force and effect at all times during the term of this Agreement, and for a period of three ( 3) years from the date of the completion of all Project Services provided hereunder ( the PLI Coverage Period"). If any PLI policy is replaced, cancelled, non-renewed, discontinued, or otherwise terminated, or if the limits of a PLI policy are reduced or the available coverage depleted below the required minimum coverage amounts for any reason during the PLI Coverage Period, Contractor shall immediately obtain replacement PLI coverage meeting the requirements of this Section

5.2.1. Such replacement coverage shall satisfy all requirements herein, and shall include coverage for the prior acts or omissions of Contractor during the time period during which any Project Services were performed. The coverage shall be evidenced by either a new policy evidencing no gap in coverage, or by obtaining separate extended “ tail” coverage with the present or new carrier or other insurance arrangements providing for complete coverage, either of which shall be subject to the written approval by West- Comm.

5.2.1.3 If the PLI policy is written on an “ occurrence” basis, the policy shall be continued in full force and effect during the term of this Agreement, or until completion of the Project Services provided for in this Agreement, whichever is later. In the event of termination of the PLI policy during this period, new coverage shall immediately be obtained, and written evidence of the policy shall be immediately provided to West- Comm, to ensure PLI coverage during the entire course of performing the Project services.

5.2.1.4 Contractor shall not perform any Project Services at any time during which required types or amounts of PLI insurance are not in effect, and West- Comm shall have no obligation to pay Contractor for Project Services performed while required PLI insurance is not in effect.

5.2.2 Commercial General Liability Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Commercial General Liability Insurance ( CGL). Coverage shall be at least as broad as ISO Form CG 00 01 written on a per occurrence basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits of no less than One Million Dollars 1,000,000.00) per occurrence and Two Million Dollars ($ 2,000.000.00) in the general aggregate.

The policy shall not contain any endorsements or provisions limiting coverage for (1) contractual liability, ( 2) cross liability exclusion for claims or suits by one insured against another, or ( 3) contain any other exclusion contrary to the Agreement.

5.2.3 Automobile Liability Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Automobile Liability Insurance. Coverage shall be at least as broad as ISO Form CA 00 01 written on a per occurrence basis, covering Code 1 ( any auto), or if the Contractor has no owned autos, Code 8 (hired) and Code 9 ( non-owned), with limits of no less than One Million Dollars ($ 1,000,000.00) for each DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 225 of 469 ends

8 occurrence covering bodily injury and property damage.

5.2.4 Workers’ Compensation Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Workers’ Compensation Insurance in at least the minimum statutory amounts, and in compliance with all other statutory requirements, as required by the State of California. Contractor agrees to waive and obtain endorsements from its workers’ compensation insurer waiving all subrogation rights under its workers’ compensation insurance policy against the City, its officials, officers, employees, agents and volunteers, and to require each of its subconsultants and subcontractors, if any, to do likewise under their workers’ compensation insurance policies. Contractor shall also obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Employer’ s Liability Insurance written on a per occurrence basis with limits of at least One Million Dollars 1,000,000.00) per accident for bodily injury or disease. Notwithstanding the foregoing, Contractor shall not be required to procure either Worker’ s Compensation Insurance or Employer’ s Liability Insurance if Contractor provides written verification to the City that Contractor does not have any employees.

5.3 Acceptability of Insurers. Insurance required by this section shall be issued by a licensed company authorized to transact business in the state by the Department of Insurance for the State of California with a current rating of A-:VII or better ( if an admitted carrier), or a current rating of A:X or better ( if offered by a non-admitted insurer listed on the State of California List of Approved Surplus Lines Insurers ( LASLI)), by the latest edition of A.M. Best’ s Key Rating Guide, except that the City will accept workers’ compensation insurance from the State Compensation Fund. In the event the City determines that the work or Project Services to be performed under this Agreement creates an increased or decreased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies may be changed accordingly upon receipt of written notice from the City. Contractor shall immediately substitute any insurer whose A.M. Best rating drops below the levels specified herein.

5.4 Specific Insurance Provisions and Endorsements. Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for written approval. Required insurance policies shall contain the following provisions, or Contractor shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:

5.4.1 CGL and Auto Liability Endorsements. The policy or policies of insurance required by this section for CGL and Automobile Liability Insurance shall be endorsed as follows:

5.4.1.1 Additional Insured. The City, its officials, officers, employees, agents and volunteers, shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Agreement; and

5.4.1.1.1 Additional Insured Endorsements. Additional insured endorsements shall not ( 1) be restricted to “ ongoing operations”, ( 2) exclude “ contractual liability”, ( 3) restrict coverage to “ sole” liability of Contractor, or (4) contain any other exclusions contrary to the Agreement; and, the coverage shall contain no special limitations on the scope of protection afforded to additional insureds.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 226 of 469 ends

9 5.4.1.2 Primary and Non-Contributing Insurance. Each CGL and Automobile Liability Insurance policy shall be endorsed to be primary, and any other insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees, agents or volunteers, shall not contribute with this primary insurance.

5.4.1.3 Waiver of Subrogation. Each CGL and Automobile Liability Insurance policy shall contain or be endorsed to waive subrogation against the City, its officials, officers, employees, agents and volunteers, or shall specifically allow Contractor or others providing insurance evidence in compliance with the requirements set forth in this section to waive their right to recovery prior to a loss. Contractor hereby agrees to waive its own right of recovery against the City, its officials, officers, employees, agents and volunteers, and Contractor hereby agrees to require similar written express waivers and insurance clauses from each of its subconsultants or subcontractors.

5.4.2 Notice of Cancellation. Each policy of any type shall be endorsed to provide that coverage shall not be suspended, voided, cancelled, or modified, or reduced in coverage or in limits, except after thirty (30) calendar days prior written notice has been provided to the City. Notwithstanding the foregoing, if coverage is to be suspended, voided, or cancelled because of Contractor’ s failure to pay the insurance premium, the notice provided by the insurer to City shall be by not less than ten (10) calendar days prior written notice. (A statement that notice will be provided " in accordance with the policy terms" or words to that effect is inadequate to meet the requirements of this section.)
Deductibles and Self-Insured Retentions. Any deductible or self-insured retention must be approved in writing by the City in advance. The decision whether to approve or withhold approval of a deductible or self-insured retention shall be made by the City in the City's sole and absolute discretion.

5.6 Evidence of Coverage. Concurrently with the execution of the Agreement, Contractor shall deliver certificates of insurance together with original endorsements affecting each of the insurance policies required by this section. Contractor shall promptly furnish, at City’ s request, copies of actual policies including all declaration pages, endorsements, exclusions and any other policy documents City may require to verify coverage.

5.6.1 Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for written approval.

5.6.2 Authorized Signatures. The certificates of insurance and original endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf.

5.6.3 Renewal/ Replacement Policies. At least fifteen ( 15) calendar days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced and not replaced immediately so as to avoid a lapse in the required coverage, Contractor shall, within ten (10) calendar days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 227 of 469 ends

10 reinstated or has been provided through another insurance company or companies meeting all requirements of this Agreement.

5.7 Requirements Not Limiting. Requirement of specific coverage or minimum limits contained in this section are not intended as a limitation on coverage, limits, or other requirements, or a waiver of any coverage normally provided by any insurance. Nothing in this section shall be construed as limiting in any way the indemnification provision contained in this Agreement, or the extent to which Contractor may be held responsible for payments of damages to persons or property.

5.8 Enforcement of Agreement ( Non-Estoppel). Contractor acknowledges and agrees that actual or alleged failure on the part of the City to inform Contractor of any noncompliance with any of the insurance requirements set forth in this section imposes no additional obligation on the City nor does it waive any rights hereunder.

5.9 Insurance for Subconsultants. Contractor shall either: ( 1) include all subconsultants or subcontractors engaged in the performance of Project Services on behalf of Contractor as additional named insureds under the Contractor’ s insurance policies; or ( 2) Contractor shall be responsible for causing its subconsultants or subcontractors to procure and maintain the appropriate insurance in compliance with the terms of the insurance requirements set forth in this section, including adding the City, its officials, officers, employees, agents and volunteers, as additional insureds to their respective policies. Contractor shall not allow any subconsultant or subcontractor to commence any work or services relating to this Agreement unless and until it has provided evidence satisfactory to City that the subconsultant or subcontractor has secured all insurance required under this section.

5.10 Other Insurance Requirements. The following terms and conditions shall apply to the insurance policies required of Contractor and its subconsultants and subcontractors, if any, pursuant to this Agreement:

5.10.1 Contractor shall provide immediate written notice to City if (1) any of the insurance policies required herein are terminated, cancelled or suspended, ( 2) the limits of any of the insurance coverages required herein are reduced, or (3) the deductible or self-insured retention is increased.

5.10.2 All insurance coverage and limits provided by Contractor and available or applicable to this Agreement are intended to apply to each insured, including additional insureds, against whom a claim is made or suit is brought to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to the City or its operations shall limit the application of such insurance coverage.

5.10.3 None of the insurance coverages required herein will be in compliance with the requirements of this section if they include any limiting endorsement which substantially impairs the coverages set forth herein ( e.g., elimination of contractual liability or reduction of discovery period), unless the endorsement has first been submitted to the City and approved in writing.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 228 of 469 ends

11 5.10.4 Certificates of insurance will not be accepted in lieu of required endorsements, and submittal of certificates without required endorsements may delay commencement of the Project. It is Contractor’ s obligation to ensure timely compliance with all insurance submittal requirements as provided herein.

5.10.5 Contractor agrees to ensure that subconsultants and subcontractors, if any, and any other parties involved with the Project who are brought onto or involved in the Project by Contractor, provide the same minimum insurance coverage required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and others engaged in the provision of Project Services will be submitted to the City for review.

5.10.6 Contractor agrees to provide immediate written notice to City of any claim, demand or loss against Contractor arising out of the work or Project Services performed under this Agreement and for any other claim, demand or loss which may reduce the insurance available to pay claims, demands or losses arising out of this Agreement.

6. INDEMNIFICATION
To the fullest extent permitted by law, Contractor shall defend ( at Contractor’ s sole cost and expense with legal counsel reasonably acceptable to City), indemnify and hold the City, its officials, officers, employees, agents and volunteers, free and harmless from any and all claims, demands, orders, causes of action, costs, expenses, liabilities, losses, penalties, judgments, arbitration awards, settlements, damages or injuries of any kind, in law or in equity, including but not limited to property or persons, including wrongful death, ( collectively “ Claims”) in any manner arising out of, pertaining to, related to, or incident to any alleged acts, errors or omissions, or willful misconduct of Contractor, its officers, directors, employees, subconsultants, subcontractors, agents or invitees in connection with performance under this Agreement, or in any manner arising out of, pertaining to, related to, or incident to an alleged breach of this Agreement, including without limitation the payment of all consequential damages, expert witness fees and attorneys’ fees and other related costs and expenses.

Notwithstanding the foregoing, and only to the extent that the Project Services performed by Contractor are subject to California Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.

Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit Contractor’ s indemnification obligation or other liability hereunder. Notwithstanding the foregoing, such obligation to defend, hold harmless and indemnify the City, its officials, officers, employees, agents and volunteers, shall not apply to the extent that such Claims are caused by the sole negligence or willful misconduct of that indemnified party.

7. REPORTS AND RECORDS
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 229 of 469 ends

12 7.1 Records. Contractor shall keep complete, accurate, and detailed accounts of all time, costs, expenses, and expenditures pertaining in any way to this Agreement. Contractor shall keep such books and records as shall be necessary to properly perform the Project Services required by this Agreement and to enable the Contract Officer to evaluate the performance of such Project Services. The Contract Officer shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records.

7.2 Reports. Contractor shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the Project Services as the Contract Officer shall require.

7.3 Ownership of Documents. All drawings, specifications, reports, records, documents, memoranda, correspondence, computations, and other materials prepared by Contractor, its employees, subconsultants, subcontractors and agents in the performance of this Agreement shall be the property of City and shall be promptly delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership of the documents and materials hereunder. Contractor may retain copies of such documents for its own use. Contractor shall have an unrestricted right to use the concepts embodied therein. Contractor shall ensure that all of its subconsultants and subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all damages resulting therefrom.

7.4 Release of Documents. Except to the extent otherwise required by law, no drawing, specification, report, record, document, or other material prepared by Contractor, its employees, subconsultants, subcontractors and agents in the performance of Project Services shall not be released publicly without the prior written approval of the Contract Officer.

8. ENFORCEMENT OF AGREEMENT

8.1 California Law and Venue. This Agreement shall be construed and interpreted both as to validity and as to performance of the Parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim, or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Orange, State of California, or any other appropriate court in such County, and Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action.

8.2 Waiver. No delay or omission in the exercise of any right or remedy of a nondefaulting Party on any default shall impair such right or remedy or be construed as a waiver. No consent or approval of City shall be deemed to waiver or render unnecessary City’ s consent to or approval of any subsequent act of Contractor. Any waiver by either Party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.

8.3 Rights and Remedies Cumulative. Except with respect to rights and remedies DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 230 of 469 ends

13 expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other Party.

8.4 Legal Action. In addition to any other rights or remedies, either Party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement.

8.5 Termination Prior to Expiration of Term. City reserves the right to terminate this Agreement, at any time, with or without cause, upon thirty ( 30) calendar days written notice to Contractor, except that where the continuation of services would constitute a danger to health, safety or general welfare, the period of notice shall be such shorter time as may be appropriate.

Upon receipt of the notice of termination, Contractor shall immediately cease all Project Services, except as may be specifically approved by the Contract Officer. Contractor shall be entitled to compensation for all Project Services rendered prior to receipt of the notice of termination and for any Project Services authorized by the Contract Officer thereafter.

8.6 Termination for Default of Contractor.

8.6.1 Contractor’ s failure to comply with any provision of this Agreement shall constitute a default.

8.6.2 If the Contract Officer determines that Contractor is in default in the performance of any of the terms or conditions of this Agreement, he/she shall notify Contractor in writing of such default. If such default is capable of being cured, Contractor shall have ten ( 10) calendar days, or such longer period as City may designate, to cure the default by rendering satisfactory performance. In the event Contractor fails to cure its default within such period of time, or if such default is not capable of being cured, City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice of any remedy to which City may be entitled at law, in equity, or under this Agreement. Contractor shall be liable for any and all reasonable costs incurred by City as a result of such default. Compliance with the provisions of this section shall not constitute a waiver of any City right to take legal action in the event that the dispute is not cured, provided that nothing herein shall limit City’ s right to terminate this Agreement without cause pursuant to Section 8.5.

8.6.3 If termination is due to the failure of Contractor to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 8.6.2, take over the Project Services and prosecute the same to completion by contract or otherwise, and Contractor shall be liable to the extent that the total direct and indirect costs for completion of the Project Services required hereunder exceeds the Maximum Contract Amount, and City may withhold any payments to Contractor for the purpose of set-off toward the cost of completion of the Project Services. The withholding or failure to withhold payments to Contractor shall not limit Contractor’ s liability for completion of the Project Services as provided herein.

8.7 Attorneys’ Fees. In the event any dispute between the Parties with respect to this DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 231 of 469 ends

14 Agreement results in litigation or any non-judicial proceeding, the prevailing Party shall be entitled, in addition to such other relief as may be granted, to recover from the non-prevailing Party all reasonable costs and expenses, including but not limited to reasonable attorneys’ fees, expert witness fees, court costs and all fees, costs, and expenses incurred in any appeal or in collection of any judgment entered in such proceeding. To the extent authorized by law, in the event of a dismissal by the plaintiff or petitioner of the litigation or non-judicial proceeding within thirty (30) calendar days of the date set for trial or hearing, the other Party shall be deemed to be the prevailing Party in such litigation or proceeding. For purposes of this section, " Reasonable attorney fees" shall be calculated by multiplying the actual number of hours reasonably expended by the attorney( s) handling the dispute on behalf of the prevailing Party by the hourly rate actually paid by the prevailing Party, but in no case shall the hourly rate exceed Two Hundred and Fifty Dollars 250.00) per hour.

9. CITY OFFICERS AND EMPLOYEES: NON- DISCRIMINATION

9.1 Non-liability of City Officers and Employees. No officer or employee of the City shall be personally liable to the Contractor, or any successor- in-interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms of this Agreement.

9.2 Covenant Against Discrimination. Contractor covenants that, by and for itself, its heirs, executors, assigns, subcontractors, subconsultants and all persons claiming under or through them, that there shall be no discrimination or segregation in the performance of or in connection with this Agreement regarding any person or group of persons on account of race, disability, medical condition, color, creed, religion, sex, sexual orientation, marital status, age, national origin, or ancestry. Contractor shall take affirmative action to insure that applicants and employees are treated without regard to their race, disability, medical condition, color, creed, religion, sex, sexual orientation, marital status, national origin, or ancestry.

10. MISCELLANEOUS PROVISIONS

10.1 Notices. Any notice, demand, request, consent, approval, or communication either Party desires or is required to give to the other Party or any other person shall be in writing and either served personally during normal hours of operation of the Party receiving the notice, or sent by pre-paid, first-class mail to the address set forth below. Either Party may change its address by notifying the other Party of the change of address in writing. Notice shall be deemed communicated on the day personally served, or two ( 2) business days from the date of mailing if mailed as provided in this section. Additionally, notices by email will be considered legal notice if such communications include the following text in the Subject field: FORMAL LEGAL NOTICE – Hirsch & Associates, Inc.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 232 of 469 ends

15 To City: Chet Simmons, City Manager
City of Los Alamitos
3191 Katella Ave.

Los Alamitos, CA 90720
csimmons@cityoflosalamitos. org
With copy to:

Michael S. Daudt, City Attorney
Woodruff, Spradlin & Smart
555 Anton Blvd., Suite 1200
Costa Mesa, CA 92626
mdaudt@wss- law.com
To Contractor: Vanessa Munoz, President
Willdan Engineering
2401 East Katella Avenue
Suite 300
Anaheim, CA 92806- 5909
vmunoz@willdan. com

10.2 Entire Agreement; Amendments in Writing. This Agreement constitutes the entire agreement between the Parties and is intended as an integrated agreement, superseding all prior negotiations, arrangements, agreements, representations, and understandings, if any, made by or among the Parties with respect to the subject matter hereof. No amendments or other modifications of this Agreement shall be binding unless executed in writing by both Parties hereto, or their respective successors, assigns, or grantees.

10.3 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement, which shall be interpreted to carry out the intent of the Parties hereunder.

10.4 Successors in Interest. This Agreement shall be binding upon and inure to the benefit of the Parties’ successors and assignees.

10.5 Third Party Beneficiary. Except as expressly provided herein, nothing contained in this Agreement is intended to confer, nor shall this Agreement be construed as conferring, any rights, including, without limitation, any rights as a third-party beneficiary or otherwise, upon any entity or person not a party hereto.

10.6 Recitals. The above- stated Recitals are hereby incorporated into the Agreement as though fully set forth herein and each Party acknowledges and agrees that such Party is bound, for purposes of this Agreement, by the same.

10.7 Prevailing Wages. Contractor is aware of the requirements of California Labor DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 233 of 469 ends

16 Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“ Prevailing Wage Laws”). Contractor agrees to fully comply with all applicable federal and state labor laws (including, without limitation, if applicable, the Prevailing Wage Laws). It is agreed by the Parties that, in connection with the work or Project Services provided pursuant to this Agreement, Contractor shall bear all risks of payment or non- payment of prevailing wages under California law, and Contractor hereby agrees to defend, indemnify, and hold the City, its officials, officers, employees, agents and volunteers, free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The foregoing indemnity shall survive termination of this Agreement.

10.8 Corporate Authority. Each of the undersigned represents and warrants that (i) the Party for which he/she is executing this Agreement is duly authorized and existing, ( ii) he/she is duly authorized to execute and deliver this Agreement on behalf of the Party for which he/she is signing, ( iii) by so executing this Agreement, the Party for which he/she is signing is formally bound to the provisions of this Agreement, and ( iv) the entering into this Agreement does not violate any provision of any other agreement to which the Party for which he/she is signing is bound.

SIGNATURES ON NEXT PAGE]
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 234 of 469 ends

17 IN WITNESS WHEREOF, the Parties have executed and entered into this Agreement as of the date first written above.

City”
City of Los Alamitos
By:

Tanya Doby
Mayor
APPROVED AS TO FORM.

Woodruff, Spradlin & Smart, APC
By:

Michael S. Daudt
City Attorney
ATTEST:

By:

Windmera Quintanar, MMC
City Clerk
Contractor”
Willdan Engineering
By:

Vanessa Munoz
President
vmunoz@willdan. com
By:

Adel M. Freij, PE
Director - Engineering
afreij@willdan. com
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044 3/ 22/ 2023
3/ 22/ 2023
3/ 23/ 2023
3/ 23/ 2023
3/ 23/ 2023

Page 235 of 469 ends

EXHIBIT “ A”
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 236 of 469 ends

City of Los Alamitos
Development Services Department
Proposal
January 12, 2023
City Engineering and Traffic
Engineering Services
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 237 of 469 ends

January 12, 2023
City of Los Alamitos
3191 Katella Avenue
Los Alamitos, CA 90720
Attention: Ron Noda
Development Services Director
Subject: Proposal for City Engineering and Traffic Engineering Services, RFP No. 2022 05 The City of Los Alamitos City) is seeking consultants to provide City Engineering and Traffic Engineering services to support its capital improvement projects and engineering needs. Willdan Engineering Willdan) has been providing quality on call engineering services to 95% of California cities and counties for over 58 years—23 of those years with the City of Los Alamitos. Our staff has worked closely with city staff across California and currently provides municipal engineering related services such as city engineering, traffic engineering, civil engineering design, construction management, and development review services to the County of Orange and the cities of Yorba Linda, Brea, Laguna Niguel, Newport Beach, Paramount, South Gate, Lakewood, Downey, Long Beach, Bell, and La Puente, to name a few. Many of our staff served as Public Works Department staff before joining our firm providing us with unique insights into critical City challenges and their optimal solutions.

Currently, our staff proudly serves the City of Los Alamitos as the City Engineer, Traffic Engineer, and Interim Public Works Superintendent providing your City with a collective team of experienced civil engineers, traffic engineers, surveyors, geotechnical engineers, landscape architects, and other specialty engineers and support staff. Willdan is deeply interested in and committed to continuing to provide these services to the City. We bring the following significant and relevant qualifications that will result in successful performance.

Superior City and Traffic Engineers
Willdan's proposed City Engineer, Mr. Chris Kelley, PE, QSD/ P, has over 17 years of city/municipal engineering experience— the last three years, as City Engineer for the City of Los Alamitos. In addition, he has recent experience as the City of Rolling Hills Estates Special City Engineer and has served as a Project Manager for various cities including Cerritos, Hawaiian Gardens, and the City of Napa. Mr. Kelley is a well rounded civil engineer with experience in roadway and drainage design, hydrology and hydraulics, water quality Best Management Practices BMPs), land development review, project and construction management, project report writing, and utility design and coordination. Mr. Kelley is adept at building the right team around the City’s scope of work and expectations, managing staff and subconsultant teams effectively, and identifying and correcting critical path issues before they impact the budget and schedule. Willdan’s proposed Traffic Engineer, Mr. Farhad Iranitalab, TE, PTP, has 39 years of traffic engineering experience—six as the City’s Traffic Engineer. In addition, he has recent experience serving as the part time Traffic Engineer for the cities of La Canada, Norwalk, and Pico Rivera. Willdan’s 23 years of service to the City of Los Alamitos and our team’s understanding of the City’s processes, procedures, stakeholders and community will enable us to operate efficiently and cost effectively while achieving excellent results.

Two Decades of Consistently High Performance for the City of Los Alamitos Willdan has enjoyed a productive working relationship with the City of Los Alamitos since 1999, and we are looking forward to this opportunity to expand our partnership. Willdan’s key capabilities include:

Experienced City Engineer with Awareness of Los Alamitos Infrastructure, Staff, and Community. During his service to Los Alamitos, our proposed City Engineer, Mr. Chris Kelley, has worked closely with City staff, developing core relationships with many of the City’s Community Development and Public Works team members which has enabled efficient and meaningful service to the City. Mr. Kelley coordinates with City staff on a daily basis and DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 238 of 469 ends

frequently meets with the community face to face to address engineering questions and concerns from businesses and residents. During his service to the City, Mr. Kelley has also developed key relationships with adjacent Cities, agencies, and local utility providers. He currently works closely with the Orange County Sanitation District OC San) on their current first phase citywide sewer rehabilitation project. Willdan provides agency coordination, reviews, and inspections for this project. We have reviewed plans and specifications for the second phase of the OC San citywide sewer work which will begin construction in late 2023. Other large agency coordinated projects that our city engineer currently facilitates are the Rossmoor Sewer District citywide sewer improvements, the 605 Freeway Interchange at Katella Avenue street improvement project led by the Orange County Transit Authority OCTA) and Caltrans, and ongoing work with Southern California Edison to replace deteriorated power poles and upgrade facilities serving residents and businesses, to name a few. Mr. Kelley recently oversaw design and construction of the City’s 2022 Measure Y’ sales tax funded street improvement project on various streets which repaved nineteen 19) different residential streets, representing each district of the City. In addition, Mr. Kelley has worked with multiple new developments within Los Alamitos, facilitating grading and drainage project plan reviews and making sure that offsite street improvements are done in compliance with project plans, including the City’s new luxury apartments along Cerritos Avenue.

Deep Understanding of Los Alamitos Traffic Engineering Infrastructure and Requirements. Our traffic engineering staff currently provides support to Los Alamitos' City Engineer for traffic designs and studies, including the Old Towne West traffic calming project that provided innovative striping solutions to encourage safer streets for pedestrians and drivers. Our proposed Traffic Engineer, Mr. Farhad Iranitalab, prepared and presented to the Traffic and Planning Commissions the impact of the recent adoption of the new California Environmental Quality Act CEQA) requirements related toVehicle Miles Travelled VMT) instead of Level of Service LOS) as the measuring metric to determine transportation impacts from development projects. He regularly consults with the Development Services Director and City Engineer regarding traffic related matters and addresses technical traffic related questions and concerns from residents and business owners as directed by City staff. He and our other staff have extensive experience in consensus building and attending meetings with other public agencies such as the County of Orange, Orange County Transportation Authority, and California Department of Transportation.

Capacity to Accomplish All Los Alamitos Public Works Requirements Willdan’s comprehensive capabilities will ensure continuity, efficiency, cost effectiveness, quality and adequate resources and give the City maximum control over its workload. With 184 full and part time staff in Southern California and 1,600 firm wide, Willdan has the capacity to rapidly reassign project workloads to an expanded team of subject matter experts from our corporate resources to keep pace with the City’s requirements. Willdan regularly manages 200 active on call contracts at any given time and has ample capacity to successfully perform comprehensive city engineering and traffic engineering services across the City’s entire scope of work. Willdan’s corporate office and office for contractual matters is located at 2401 East Katella Avenue, Suite 300 in Anaheim, California, 92806. Location and contact information for our other offices can be found on our website. Our Federal Tax identification number is 95 2295858. Our insurance coverage will remain in effect and in force at the time of contract execution. Willdan has no known conflicts of interest on this proposal nor any failures or refusals to complete a contract.

During our years of service to the City of Los Alamitos, we have developed fruitful working relationships with City staff and look forward to remaining part of your vibrant team of staff members who continue to place the City and its needs at the forefront. As Director of City Engineering, I am committed to prioritizing the City’s requirements and delivering the resources and expertise you need to achieve optimum results throughout the contract duration. If you have any questions regarding this proposal, please contact Mr. Adel Freij, at 562) 760 7752, or [email protected], or Chris Kelley at 562) 321 1204 or [email protected].

Respectfully submitted,

WILLDAN ENGINEERING
Adel M. Freij, PE
Director of City Engineering
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 239 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 3 ends

About Willdan
Willdan Engineering, a California corporation since 1964, is a subsidiary of Willdan Group, Inc., a publicly traded Delaware corporation. Services are provided to nation wide clientele through our subsidiary firms Willdan Engineering, Willdan Energy Solutions, and Willdan Financial Services that offer a portfolio of diversified strengths.

Throughout our 58+ year history, Willdan Engineering Willdan) has served as a full service, multi disciplinary firm specializing in municipal planning, engineering design, construction management and inspection, and building and safety services. Our full complement of support disciplines provides effective and efficient solutions to resolve everchanging challenges experienced by municipal agencies today and in the future.

Willdan has historically concentrated our efforts in public works engineering for cities, counties, and special districts.

Since 1964, we have evolved into a professional consulting firm offering a broad array of services that provide a comprehensive and integrated approach to our clients’ needs.

Willdan possesses expertise in most facets of the public sector marketplace. The varied experience and background of our staff experience is an added value of our services. No other firm matches Willdan’ s combined breadth of directly relevant technical and operational expertise and depth of experience.

Willdan benefits from longstanding, well established relationships with local and state government agencies, municipal utilities, and regional boards throughout the United States. Headquartered in Anaheim, Willdan operates from offices in over two dozen states spanning the entire country. Willdan maintains a strong balance sheet with the financial and staffing resources to perform and complete all contractual obligations. We have continued to grow to better serve our clients by offering a continuously expanding range of municipal services. There are no pending financial conditions that would impede Willdan' s ability to complete the City' s contract.

Willdan Staff of Experts
Municipal Engineering and Management
Capital Improvement Program CIP)
Highway and Freeway Engineering
Building Safety Services
Environmental Planning
Geotechnical/ Geological Engineering
Assessment Engineering
Computer Aided Analysis and Design
Geographical Information System GIS)
Program and Construction Management
Construction Inspection and Support
Traffic and Transportation
Water and Wastewater
Urban and Regional Planning
Drainage and Flood Control
Structural Engineering
Right of Way Engineering
Landscape Architecture
Grant and Funding Administration
Labor Compliance
For any project to be successful, organization and positive management of the consultant team is essential. That is why we assign a senior member of our staff, Mr. Chris Kelley, PE, QSD/ P, who will continue his role as City Engineer.

He will be the contact person for communications and inquiries from the City of Los Alamitos and will have overall responsibility for coordination and administration of services to be provided by Willdan. Mr. Farhad Iranitalab will continue his services as City Traffic Engineer for the city. Keeping Mr. Kelley and Mr. Iranitalab in their current position with the city will allow a seamless transition between contract periods with no four week transition or adjustment period needed. Mr. Adel Freij, PE, Director of City Engineering Services, will serve as Principal in Charge. Mr. Freij will be responsible for ensuring that the City’ s needs are met, that work efforts are fully coordinated, and that work performance is at the highest technical level. Our team possesses a keen understanding of the City' s goals and objectives on both current and future projects. We are highly familiar with the City' s policies, procedures, funding resources, guidelines, and standards, and we understand that the standards are due to be reviewed and/ or updated. This knowledge and experience enable us to quickly initiate projects and respond DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 240 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 4 ends

appropriately to City staff input and/ or concerns, as well as complete ongoing projects with no downtime or transition period needed.

Willdan Understanding and Approach
Willdan is providing City Engineering and Traffic Engineering as outlined in the City’ s Request for Proposals RFP) on a contract basis to over 50 California cities currently and is prepared to meet all the conditions specified. Willdan is well qualified to continue providing the requested services by the City of Los Alamitos.

Since 1964, Willdan has provided consulting services to hundreds of public agencies in the western United States.

Our depth of experience and broad range of capabilities allow Willdan to offer comprehensive resources for efficient and convenient service. In addition, our expertise in the engineering and planning fields ensures innovative and effective solutions will be applied to all projects undertaken by Willdan. Many of our specialists have a strong background and an intimate understanding of diverse programs for public agencies. This expertise provides the foundation for planning, design, inspection, and administration under agency programs, and offers added value with our unique familiarity with state and federally funded programs. We also place strong emphasis on communication and maintaining personal interaction with the community at large.

One key benefit of selecting Willdan for your City and Traffic Engineer roles is enabling direct access to Willdan’ s extensive design staff and experts in selected fields. This direct access approach allows for a streamlined planning process for projects from inception to construction. Project related questions and needs can be answered on the spot and project details can be worked out from a simple email, phone conversation, video conference or one on one discussion as our primary office is in Orange County, minutes from City Hall. Willdan utilizes a management approach, whereby each assignment is undertaken by a project team. Each project is assigned to a senior member of our staff with the background, experience, and availability best suited for the assignment. Our approach to serve the City on this contract is based on our 58 year history of serving public agencies.

For this assignment, Willdan’ s City Engineer Mr. Chris Kelley, PE, QSD/ P, will be the single point of contact for the City’s staff and will convey all important matters to the project team as appropriate. Mr. Kelley will serve the City at City Hall for approximately 30 40 hours per week as specified in the RFP.

Willdan has designated a city engineering team to provide as needed support to the City for specific project/ task work orders. The fundamental goal of Willdan' s team is to provide the City with the highest level of support in completing the as needed special tasks. This will require close personal coordination between Willdan and the City.

To accomplish this, we will conduct interactive meetings with City staff throughout the course of each assignment to ensure all issues are addressed. Our team has a broad variety of talent and experience in city engineering; development review; public works permitting and inspection; capital improvement project design, inspection, and contract administration; facilities maintenance and repair; surveying; and soils investigation. Combined with our understanding of the desired services and our experience with the City of Los Alamitos, Willdan can assist the City with successful completion of all city engineering matters.

Willdan will commit the appropriate staff to ensure specific projects, as well as the overall contract, are successful.

Our intended approach is to fully understand each project requested by the City, to review the scope of work for each project in detail with the City, agree on the course or extent of the best suited action, and proceed accordingly.

Having successfully completed many other assignments of this type for the City of Los Alamitos and other agencies in Orange and Los Angeles Counties, Willdan' s proposed team understands City processes and possesses the technical and communication skills that are vital to ensuring each task receives the necessary attention, objectives are met, schedules are adhered to, and each task stays on budget. Willdan' s management approach has been proven on past assignments for the City to be effective in delivering services on time, within budget, and to the City’s satisfaction.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 241 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 5 ends

Methodology
Willdan' s methodology focuses heavily on client service and communications. As a firm with a strong public agency orientation, many of our client relationships are long term and ones in which our staff develops intimate familiarity with City staff since we very often serve as an extension of City staff. As such, it is extremely important that our presence on each assignment is seamless.

Willdan' s staff assigned as extension of city staff, such as City Engineer, on a routine or on call contract basis, most often work independently of the project team, since they are generally working directly for and with City staff as city staff. In this instance, the project team’ s role is subservient to the primary assignment and only comes into play on a support basis or on a project specific basis, such as for additional services for capital improvement project design, reviewing tract and parcel maps, inspection services, construction management, and traffic engineering studies.

Technical Approach
Upon commencement of this assignment, Willdan’ s City Engineer, Mr. Chris Kelley, PE, QSD/ P, will meet with City staff to discuss the project assignment in more detail. Based upon the City’ s needs, the routine hours at the City for Mr. Kelley are flexible and can be adjusted to various combinations to balance coverage of work as well as budgetary considerations. For this contract, the City Engineer will report to the Director of Public Works. Mr. Kelley’ s approach to the assignment will depend largely upon the specific needs of the City at any given time; however, he will generally start each day with a review of ongoing work efforts, new work efforts that have been assigned, and discussion with City staff. Since he is accustomed to city engineer assignments, many of these efforts will be self directed, except as otherwise given general or specific direction from the City, as deemed appropriate.

For work efforts while at the City, such as project management, technical advice, and preparation of City Council agenda items, Mr. Kelley will work closely with City staff to coordinate specific tasks and to provide appropriate input when needed. He will make necessary contacts with private developers, other public agencies, and other City departments on an as needed basis. To understand all issues relating more fully to specific projects, Mr. Kelley will research available records at the City, make field reviews as appropriate, and hold discussions with City staff. At the end of each day, he will review the events of the day, schedule any remaining needed efforts by City staff, and establish a preliminary list of efforts for his next regularly scheduled day at the City.

From time to time, the city engineer duties may require Mr. Kelley to be contacted while not at the City. In such cases he will routinely check for messages, both at the City and at Willdan, to keep current with ongoing issues and to formulate and deliver timely responses. This may require him to coordinate with or assign work efforts to City or Willdan staff. Whenever feasible, he will also be available for direct communication while he is away from the City' s office.

Our project approach begins with designating a complete project management team. If selected by the City, and upon written request from the City Project Administrator, Willdan will provide a letter proposal to the City for the specific services requested by the City for each assignment. Each project management team will be led by a principal representative with full authority to direct operations and commit resources. In addition to the principal representative, the management team will include expert staff specializing in the type of service requested. Our array of in house experts allows Willdan to develop a specialized management team for each requested project. In addition, Willdan’ s size gives us the flexibility to undertake large projects and projects on a compressed time schedule. If a project arises that requires immediate or extra attention, Willdan’ s flexibility allows tasks to be rapidly delegated to an expanded team of staff members. This ensures that the project will receive appropriate attention to detail and be completed in a timely fashion.

The first task of Willdan’ s delegated project management team will be to establish a course of action. This task will begin by coordinating with the City to identify specific project objectives. With these objectives in mind, Willdan’ s experienced professionals will actively identify areas of need and design solutions to address these needs. Our DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 242 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 6 ends

policy of open and often client coordination will ensure the established course of action and will be consistent with the City’s goals.

Once the course of action is established, Willdan will develop a project schedule. Each project schedule will be developed with the City’s project completion date in mind and will include a critical path and measurable milestones to ensure the project completion date is met. All project schedules will be submitted to the City to guarantee consistency with the City’ s timeline. In enacting and completing the course of action, Willdan strives to exceed client expectations for quality of work. Willdan has a history of completing projects on time, within budget, and beyond industry standards. Willdan is committed to providing this level of service to the City. As such, after each project is completed, Willdan will follow up with the City to gather feedback on the City’ s satisfaction with the project, and to identify methods to improve future service.

Firm Qualifications
Willdan has been providing exceptional services for municipalities since its inception. The relevant disciplines to the City’ s request are described in more detail below.

General Municipal Engineering Services
Willdan’ s City Engineering Group performs general engineering services for many cities in California and Arizona. Our goal is to come up with solutions in helping cities serve their constituents; whether temporary, as needed assistance, or long term assignments. We specialize in preparing capital improvement programs CIPs), annual budgets, assisting in grant writing and funding applications, and researching infrastructure for statement evaluation. Our city engineering staff also provides recommendations for the implementation of National Pollutant Discharge Elimination System NPDES) and Americans with Disabilities Act ADA) requirements. Our City Engineers are available to write staff reports, report to City Managers and Directors, and attend City Council Meetings.

To support cities with Development, Willdan provides engineering plan review services for a variety of land development projects. The work encompasses review of improvement plans, including street plans, traffic signal plans, signing and striping plans, grading and drainage plans, sewer, water, storm drain plans, erosion and sediment control plans and storm water quality and SWPCP/ SWPPP/ PCSMP documents. The Willdan team is adept at coordinating a complete land development review from project inception and conditioning through approval and permitting, construction phase support for change orders and final as built and acceptance procedures.

Civil Engineering Design
Willdan’ s highly trained and experienced civil engineering staff is supported by technical experts in various disciplines throughout the company. As a result, Willdan offers a range of expertise that only a large firm can provide. Willdan’ s civil design expertise includes transportation engineering; hydrology, drainage, water quality, and water/ wastewater engineering.

Our approach and work scope for street and transportation improvements varies with the type of project assigned.

Our experiences involve a full range of project size from local street rehabilitation to multi million dollar highway, transit corridor, and rail station projects. Willdan has provided engineering design, review and construction management for hundreds of roadway improvements, rehabilitation, and resurfacing projects. Willdan has expertise in all aspects of hydrology, drainage, and flood control, ranging from local and regional drainage and flood control improvements to hydraulic and sediment transport analyses of major rivers. In addition, Willdan’ s design experience encompasses virtually every type of water and wastewater system project, including collection systems, City Engineering Services
Capital Improvement Programs
Grant Writing and Funding
Administration
City Engineer
Staff Augmentation
Stormwater/ NPDES Compliance
ADA Compliance
Project Management
Plan Check
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 243 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 7 ends

disposal facilities, distribution pipelines, master plans, production wells, pump stations, reservoirs, studies, telemetry monitoring systems, and treatment facilities.

To accompany our projects, Willdan implements water quality measures to meet the State and County requirements of the National Pollutant Discharge Elimination System NPDES). Willdan prepares erosion and sediment control plans in accordance with City and State Regional Water Quality Control Board requirements. We have been providing project design of Low Impact Development LID) practices such as green streets, infiltration basins, rain gardens and bioretention/ biofiltration facilities for compliance with the LID requirements of the Orange County Model Water Quality Management Plan WQMP) and Technical Guidance Document.

Willdan is also the NPDES Coordinator for numerous cities in Southern California. As such, we represent the City at all co permittee meetings, report to the City Manager and the City Council to keep them abreast of required actions by the City and potential fiscal impacts.

Geotechnical Engineering and Construction Inspection
Willdan provides geological, geotechnical, material testing, and inspection services for many public agencies in California and the Western United States. Willdan’ s geotechnical office is equipped with a full service soils laboratory, certified and/ or accredited by AASHTO Material Reference Laboratory AMRL), and CALTRANS. With extensive experience throughout Los Angeles, Orange, San Bernardino, Riverside, and Ventura Counties, Willdan is intrinsically familiar with local geologic, geotechnical, and seismic conditions.

Traffic and Transportation Engineering
Willdan specializes in providing traffic engineering and transportation planning services to governmental agencies. Our services range from responding to citizen complaints to designing and managing multimillion dollar capital improvement projects. Currently, our staff serves as contract city traffic engineers or provides traffic engineering services for approximately 40 cities in the southwest.

Our front line knowledge and understanding of local road and traffic conditions are the cornerstone of our services. Willdan’ s traffic engineering staff applies state of the art concepts to confirm the adequacy of transportation facilities, to determine the need for traffic control devices, and to ensure the safe and efficient operation of the transportation system.

Our staff of experts conducts traffic surveys and data collection, investigates motorist and vehicle characteristics identifying and making recommendations on traffic safety, utilizes traffic laws and enforcement to determine traffic signal timing, and evaluates highway operations. Willdan Transportation Engineering
Major Highway Facilities
Roadway Improvements
Bridges and Structures
Curbs, Gutters, and Sidewalks
Rail/ Transit Systems
Airport Development
Pavement Management Systems
Hydrology, Drainage, Flood Control and
Water/ Wastewater Engineering Services
Master Plans
Feasibility Studies
Storm Drain/ Flood Control Facilities
Planning
Storm Drain/ Flood Control Design
NPDES Requirements
Hydraulic Models
Scour and Sediment Transport Analysis
Debris Dam and Side Weir Design
Water Quality Management Plans WQMP)
Sewer Design
Geotechnical Engineering and
Geologist Services
Geotechnical Engineering
Slope Stability and Settlement Analysis
Earthquake and Seismic Hazard Analysis
Engineering Geology and Hydrogeology
Full Service Geotechnical Laboratory
Materials Sampling and Testing
Traffic Engineering Services
Traffic Signal and Control Systems
Signing and Striping Plans
Traffic Control
Circulation Systems
Parking Studies/ Management
Street Lighting
Electric Vehicle EV) Charging Stations
Traffic Management Plans TMPs)
Transportation Demand Management
TDM) Analyses
Capacity Evaluations
Bicycle and Pedestrian Facilities
Traffic Impact Studies
Neighborhood Traffic Management
Suggested Route to School and
Pedestrian Studies
Engineering and Traffic Surveys
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 244 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 8 ends

prepares traffic engineering designs to warn, regulate, and guide traffic. We develop geometric design and channelization, traffic signal and street lighting plans, parking lot designs, and develop traffic control plans for construction.

Landscape Architectural Design
Willdan’ s Landscape Architecture Group focuses on designing landscapes for public improvement projects, such as park and recreational facilities, community centers, and roadway beautification. In developing quality projects and plans, our landscape architects apply their talents and knowledge of site analysis, user needs programming, site design, urban design, landscape preservation, land management, water conservation, and land reclamation.

With experience, mostly in California, our landscape architects offer an essential array of services and expertise that adds long term value to projects and communities.

Construction Management and Inspection
Willdan offers a full complement of construction management, observation, and testing ser vices for public works projects, including streets and highways, bridges, transit facilities, buildings, parking lots, park facilities, utilities, and infrastructure facilities, including sewer, water, and storm drain systems. We provide skilled resident engineers, construction/ project managers, and construction observers who can monitor and direct activities to keep construction on schedule and within budget. Willdan’ s approach to construction management and observation establishes a set of guidelines specifically tailored to the client’ s standards and project goals. Document control is also emphasized. Project coordination with adjacent contracts and agencies is stressed to address potential problems and eliminate adverse impacts to construction progress.

Survey and Mapping
Willdan currently provides professional survey, subdivision map and engineering plan check services for numerous cities and counties throughout California. These services include preparing and/ or reviewing easement documents, lot line adjustments, parcel and tract maps, dedications, and vacations, along with ensuring compliance with the Subdivision Map Act.

Willdan' s plan checking applies City, State and Federal guidelines, particularly the California Subdivision Map Act and general compliance with City Standards, Codes, Ordinances, Conditions of Approval, and Regulations. Our staff of experts will review engineering documents/ plans/ maps for accuracy and adequacy and will submit an approval letter stating the same if required. Open communication is one of the most important elements to the success of a plan check. Willdan will always perform all necessary correspondence and coordination with City Staff to ensure the plan check is completed in a timely manner.

Landscape Architectural Design
Landscape Design
Plans, Specifications, and Estimates
Landscape Studies and Reports
Irrigation Plans
Plan Checking
Arborist Services
Facilities Architecture and Design
Survey and Mapping Services
Easement Documents
Lot Line Adjustments
Parcel and Tract Maps Review
Dedications/ Vacations
Subdivision Map Act Compliance
Improvement Plan Check
Construction Management and
Inspection
Cost Estimating
Constructability Reviews
Bid Administration
Resident Engineering
Contract Administration
Construction Observation
Claims Review and Investigation
Utility Coordination
Federal Labor Compliance
Material Sampling and Testing
Public Relations
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 245 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 9 ends

Storm Water Quality Services
Willdan will provide the City of Los Alamitos with professional engineering, management, and consultant services that ensure the quality, value, and sustainability of your storm water facilities and surrounding environment.

Willdan provides full NPDES Program support for Storm Water Quality Compliance. This includes the preparation of fiscal year budgets, reports, and presentations to city staff and city council; preparation of annual reports and presentations to regulators; development and management of service contracts and multiagency agreements; implementing permit compliance programs; coordination with watershed partners, regulators and at times non governmental organizations; and managing and training city personnel and contractors.

Staff can provide compliance with the Municipal NPDES Permit’ s Stormwater Management Minimum Control Measures. This includes compliance activities associated with public information and public participation, industrial/ commercial facilities, planning and land development, development construction, public agency activities, and illicit discharge/ illicit connection management.

We have been involved with Total Maximum Daily Load TMDL) Programs and Studies which involved developing and managing projects, programs, and studies commonly representing multiple clients with a common interest in the same watershed. This includes engaging with the Regional Water Quality Control Board staff and non governmental organizations, and development of multiagency agreements with complex cost sharing formulas. For example, on behalf of the cities of Agoura Hills, Calabasas, Hidden Hills, and Westlake Village, and the County of Los Angeles and its Flood Control District, we developed and currently manage the Malibu Creek Watershed CIMP. Another example is the Willdan designed, managed, and inspected installation of Connector Pipe Screens CPS) and Automatic Retractable Screens ARS) full capture devices for more the 20 municipal clients in southern California.

Funding Administration
Willdan is highly experienced in regulations pertaining to the expenditures of Federal, State, County, and local funds, which include Measure M, Community Development Block Grant CDBG), State Transportation Program Local STPL), State Gas Tax, and various other grant and funding sources. Willdan has coordinated, prepared, and submitted all necessary documentation to the Orange County Transit Authority OCTA) and Caltrans to assist cities in securing federal authorization and obligation of funds for projects. When requested, Willdan has prepared funding applications, invoices, and other required documentation.

Although each program may encompass different components and requirements, the general process remains the same following the Caltrans Local Assistance Procedures Manual LAPM). Willdan also keeps informed of revisions LPPs) to procedures and forms in the LAPM. We have assisted cities at various stages of the federal/ state funded project as follows:

FTIP Programming
Request Federal/ State Project Number
Request for Authorization to Proceed with Preliminary Engineering NEPA/ CEQA documentation
Special Funding Administration
State Transportation Program
Local STPL)
Community Development Block
Grant CDBG)
Measure M
Call for Projects
Proposition SB1
Highway Safety Improvements
Program HSIP)
Active Transportation ATP)
Highway Bridge Program HBP)
Coronavirus Response and Relief
Supplemental Appropriations

CRRSAA)
Clean California Program
Water Engineering Services
Master Plans of Drainage
Hydrology Modeling
Hydrology assessments
NPDES
Program Management
Annual Reporting
Public Information Public
Participation Program
New Significant Redevelopment
Program
Public Agency Activities Program
Illicit Discharge Detection
Elimination Program
Training Program
WQMP Inspection Program
Industrial/ Commercial Stormwater
Inspections
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 246 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 10 ends

Right of Way Certification
Request for Authorization to Proceed with Construction
Award Submittal
Progress Invoice
Final Report of Expenditures
A sample of the required federal documentation includes:

TIP New Project Form
Obligation Plan
Request Federal/ State Project Number
Field Review
Preliminary Environmental Study
Request for Authorization
Detail Estimate and Summary
Finance Letter
PS& E Certification
Right of Way Certification
Local Programs Agreement Checklist
Local Agency Contract Award Checklist
Resident Engineer’ s Construction Contract
Administration Checklist
Final Report of Expenditures Letter and
Checklist
Local Agency Final Inspection Form
Materials Certificate
Willdan also maintains excellent relations with Caltrans’ District Local Assistance Engineers and OCTA’ s staff and will answer questions regarding the submittals and status of the projects.

Project Management
Willdan’ s comprehensive project management services can take projects from inception to completion. Our staff has expertise in all areas of planning and funding administration, engineering design, program and project management, construction management, survey, materials testing, utility coordination, labor compliance, and community relations. We emphasize strong leadership, cost effectiveness, timely performance, and consistent reciprocal communication with clients and internal/ external resources.

Willdan customizes comprehensive programs to provide for any scope of services requested from simple observation inspection to complete design and construction management, including oversight and management of the design team, administration of the general contractor’ s contract, project scheduling, project budget, project controls, building inspections, public works inspection and/ or observation, deputy inspections, and materials testing.

Utility Coordination
Willdan has provided utility coordination services for numerous Southern California cities. Willdan has provided these services for various projects such as traffic signal installations, street reconstruction and resurfacing, overlays, street widenings, and neighborhood public improvement projects, just to name a few. Typical services provided by our utility coordinator include: submit notification to all affected agencies and utility companies of proposed project; submit copies of the plans to all affected utilities and agencies; coordinate with utility companies to implement upgrade of its facilities, as needed, within the project limit; identify conflicts of proposed construction with utilities and provide preliminary coordination for resolution; send notification of preconstruction conference to affected utility companies; provide attendance at the preconstruction conference by the utility coordinator; review project scope of work with each utility company at the preconstruction conference and review possible conflicts and work with each utility to assure that specific needs of the project are understood; coordinate with construction observer during construction to expedite the identification of any unknown utilities found during excavation; and coordinate relocation work by utility companies.

In addition to providing utility coordination services, Willdan regularly reviews project plans to determine if any utility relocation or coordination is necessary. When reviewing plans for utilities, Willdan makes a practice of early and open coordination with the project’ s contractor. This coordination ensures that the contractor will be aware DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 247 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 11 ends

of any special precautions that should be taken to protect the health, safety, and welfare of workmen and the public. In addition, Willdan’ s early and open coordination practices minimizes delays and conflicts by ensuring appropriate scheduling.

Federal and State Labor Compliance
Willdan has been performing federal and state labor compliance monitoring and enforcement services for over 30 years and currently serves several dozen cities in California. Our compliance management system, complete with manuals, checklists, and instructions, is unparalleled in the country. Our staff members have extensive knowledge of contract administration and applicable law; they have undergone training in the administration of projects funded by a variety of sources, including the California Department of Transportation Caltrans), the Federal Highway Administration FHWA), the Federal Transit Administration FTA), the Department of Energy DOE), the Environmental Protection Agency EPA), the State Water Resources Control Board SWRCB), and the U.S. Department of Housing and Urban Development HUD). We have established excellent working relations with key staff members at the above mentioned governmental agencies and are regularly consulted by these organizations for input on procedural issues, evolving requirements, and document development. We are cognizant of the reporting requirements for these agencies and have been thoroughly trained in fraud prevention and detection. Willdan labor compliance monitored projects have been audited by government authorities and have consistently received the highest level of approval.

SCOPE OF SERVICES
Willdan is very familiar with city services typically required in providing city engineer and traffic engineering services to Southern California cities. We have reviewed the requirements for this contract as presented and find they are consistent with the services we are currently providing to the City of Los Alamitos and have provided for other cities.

The following presents the scope of work identified in the City’ s Request for Proposal and includes, but is not necessarily limited to, the services that Willdan will provide. 1) Administrative Services
a) The City Engineer Mr. Chris Kelley, PE, QSD/ P, and Traffic Engineer Mr. Farhad Iranitalab, PE, TE, will attend meetings or work sessions of the City Council, as requested. b) Mr. Kelley will advise City officials, employees, etc. through telephone conferences, meetings, and correspondence.
c) Mr. Kelley and staff will furnish advice of consultation on the operation, maintenance, permitting of the City’ s water stormwater drainage system, transportation system, and other City owned facilities under the direction of the Development Services Department.
d) Mr. Kelley and staff will review project plans and proposals by private parties, for compliance with City code and other applicable requirements. The City Engineer will meet with residents, contractors, developers, engineers, etc. as required.
e) Staff to review and approve grading plans.
i) Shall include, but not limited to the following:
1) Ensure conformance with City codes, written policies, grading ordinances, the County of Orange grading manual, and standard specifications. The review will also assure conformance with the approved Tentative Map and Conditions of Approval for the project. Hydrology and hydraulic calculations will be reviewed for conformance with the Orange County Flood Control District methodology for any proposed storm drain systems and detention basins. 2) Precise Grading Plans will be checked to verify positive drainage to an approved outlet.

Federal and State Labor Compliance
Familiarity with:

California Department of Transportation
Caltrans)
Federal Highway Administration FHWA)
Federal Transit Administration FTA)
Department of Energy DOE)
Environmental Protection Agency EPA)
State Water Resources Control Board SWRCB)
U.S. Department of Housing and Urban
Development HUD)
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 248 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 12 ends

3) Erosion control measures for manufactured slopes will be reviewed to verify that the landscaping and irrigation measures are adequate.
f) Staff to review and approve landscape plans when applicable). i) Shall include, but not limited to the following:
1) Working knowledge of City codes, regulations, and permit requirements. 2) Program development
3) Feasibility studies
4) Investigation reports
5) Reports and restoration and maintenance
6) Conceptual design
7) Project design
8) Specifications
9) Design reviews
10) Project drafting, including CADD work
11) Cost estimating
12) Construction support services
13) Trees and other plant evaluation
14) Soils testing and report
15) Environmental documentation preparation i.e., CEQA) 16) Inspections
17) Plan Check
g) Erosion Control Plans when applicable) will be reviewed to ensure erosion and sedimentation measures comply with the Best Management Practices listed in the Storm Water Pollution Prevention Plans, in compliance with the National Pollution Discharge Elimination System NPDES) and Water Quality Management Plan WQMP) requirements as directed by City staff. h) Landscape and irrigation review for parks, parkways, medians, and all areas that have landscaping as needed).
i) Review, check and make recommendations regarding land use applications within ten 10) working days of receipt.
j) Assist with the preparation of dedications, lot splits, lot line adjustment, zoning maps, and any other subdivision maps and documents administration as deemed necessary by the City, to ensure project compliance with applicable provisions of the Subdivision Map Act, the City’ s Conditions of Approval, Land Surveyor’ s Act, and any other applicable local, state and federal laws. k) Assist and implement as needed emergency work as directed by City staff. l) Coordinate with other agencies and utility companies on engineering matters. m) Prepare CAD exhibits, complex Microsoft Excel spreadsheets, Microsoft Word documents, PowerPoint presentations, as directed, for any needed engineering functions. n) Assist with City’ s Pavement Management Program.
o) Mr. Kelley will be available to review various types of permit applications for private utility improvements, oversized/ overweight vehicles, residential improvement and other common permit applications. The City Engineer shall conduct site inspections associated with such permits and applications needed. p) Funding/ Grants/ Budget Includes but not limited to:
i) Ensure funding compliance, such as with Measure M
ii) Prepare Measure M mid year project review
iii) Assist in the Capital Improvement Program CIP) project budget preparation analyze City’ s needs and prepare short and long term CIP recommendations.
iv) Assist in the tracking and accounting of project funds including revenue sources, expenditures, and project account shortfalls/ surpluses.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 249 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 13 ends

q) Provide Geotechnical Engineering Services as needed for pavement evaluation, construction material testing, geotechnical investigation and reporting and hazardous materials assessment and related services.
r) Construction inspection and contract administration will be in accordance with but not limited to:
i) The Greenbook Standard Specifications and Standard Plans for Public Works Construction. ii) The project plans and special provisions.
iii) Caltrans Construction Manual.
iv) Manual of Traffic Controls for Construction and Maintenance Work Zones. v) The City staff input
s) On an on call basis, Willdan can provide services for additional staff to include but not limited to Landscape Architect, Labor Compliance Manager, Assistant Planner, Project Manager, Labor Compliance Specialist, Geotechnical Specialists, and a Public Works Superintendent. t) Provide surveying services including but not limited to boundary surveys, record of surveys map preparation, right of way acquisition, settlement monitoring, GPS/ Geodetic control surveys, and topographic surveys.
u) Assist in consultant contract management where no conflicts of interest exist. v) Provide hydrology and hydraulic/ drainage reports, models, and studies. w) Manage a variety of challenging multidisciplinary project from budget inception through construction. x) Prepare and secure environmental documentation for CIP projects. y) Obtain easements as needed.
2) Engineering Design and Construction
a) Assist in consulting contract management where no conflicts of interest exist. b) Prepare and process Requests for Proposals RFP) and help to conduct consultant selection processes per City policy
c) Provide hydrology and hydraulic/ drainage reports, models, and studies as needed. d) Prepare plans, specifications, engineering design calculations, and cost estimates. e) Coordinate design and construction activities with City departments, other agencies, citizens, and regulatory agencies.
f) Manage a variety of multidisciplinary projects from budget inception through construction. g) Ensure delivery of projects within schedule and budget. h) Prepare and secure environmental permits for CIP projects i) Obtain easements as needed
j) Provide public outreach coordination and exhibits.
k) Provide utility coordination and notifications for a variety of projects. l) Perform project and construction management activities for a variety of projects. Negotiate and offer recommendations to City staff regarding change orders and consultant contracts. m) Ensure Labor Compliance requirements are satisfied when applicable. 3) City Engineer
a) Willdan will assist as the City Engineer, Chris Kelley, PE shall continue to provide services on an as needed basis in the following capacities as directed by the City:
i) Function as the City Engineer as set forth in all applicable codes and regulations, and as specified in Federal and State law.
ii) Mr. Kelley will provide 30 to 40 in office working hours per week. iii) Mr. Kelley will review, approve, and issue encroachment and wide load permits. iv) Mr. Kelley will maintain, amend, and develop ordinances as needed. v) Mr. Kelley will make determination on the approval and use of alternative materials and methods of construction.
vi) Mr. Kelley will process and prepare Traffic Commission and City Council reports, recommendations, DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 250 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 14 ends

and assist in the presentation on an as needed basis.
vii) Mr. Kelley will assist other Divisions such as Code Enforcement and Planning, with the preparation of necessary documents when prosecution action is necessary to obtain compliance with any applicable codes and regulations.
viii) Mr. Kelley will make final interpretations concerning the application of all pertinent right of way and street safety codes.
ix) Mr. Kelley will meet with developers, homeowners, business owners, engineers and the general public at the City or in the field, as the need dictates to resolve grievances and/ or respond to questions and ensure timely project processing in compliance with Federal, State and City laws and ordinances. x) Mr. Kelley will work with city staff to ensure all public works/ engineering related activities are entered into the City’ s tracking system in an accurate, complete and timely manner. b) Mr. Kelley and his team will assemble and review all existing City policies, ordinances, and conditions pertaining to the Engineering operations, and document any areas of insufficient, incomplete or missing information. Based on this review, Willdan will develop a timetable for the preparation or revision of policies, ordinances, and conditions, and present a report to Development Services Director for consideration when requested by the City.
4) Neighborhood Traffic Management
i) Mr. Kelley and Mr. Iranitalab will work closely with the Development Services Director to address residential traffic circulation and safety issues.
ii) Mr. Kelley and Mr. Iranitalab will respond to requests from the public regarding traffic and parking issues. Requests will be viewed and evaluated to assess the situation and develop solutions to address the concern. Data will be collected to ensure the most appropriate measures and devices are utilized and to determine the resulting effectiveness.
iii) Mr. Kelley and Mr. Iranitalab will respond to citizens and other stakeholder requests for traffic and/ or parking information or improvements traffic control devices, parking restrictions, schools, etc.). iv) Mr. Kelley and Mr. Iranitalab will participate in the planning and preparation of work orders for the installation, removal or replacement of traffic control devices, pavement markings and parking restrictions. Prepare and document decision making process in conjunction with the Development Services Director.
5) Traffic Engineer
a) The scope of work will vary as need arises and will be at the discretion of the City. Mr. Farhad Iranitalab PE, TE will provide Traffic Engineering services for various projects at the request of City staff. The request for services may include, but not limited to:
i) Traffic Engineer, Farhad Iranitalab, PE, TE, shall continue to provide services on an as needed basis. ii) Mr. Iranitalab will conduct or review traffic engineering, traffic analysis, and transportation planning studies or project specific traffic related issues analyses. iii) Mr. Iranitalab will provide Traffic Division support i.e., traffic counts and various assignments). iv) Mr. Iranitalab will provide comprehensive analyses of existing and projected traffic conditions; roundabout analysis and design, intersection design, speed humps, and traffic data collection services. v) Mr. Iranitalab will provide electronic traffic control device studies and design signs, signals, pavement markings, and school zone flashers.
vi) Mr. Iranitalab will perform pedestrian and bicycle studies including those to provide safe routes to school.
vii) Mr. Iranitalab will review subdivision or new development projects involving traffic impact analyses, transportation modeling, area wide transportation studies and road impact fee analyses. viii) Mr. Iranitalab will review Traffic signal design including plans, specifications, engineer’ s cost estimate and contract bid documents for projects that are bid) for new permanent signal installation and modifications to existing signals and flashing beacon, signal interconnect installation and Traffic DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 251 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 15 ends

Management Center TMC) enhancement.
ix) Mr. Iranitalab will review speed data analysis intersection control studies including multi way stop control and traffic signal or alternatives, safety studies, and miscellaneous traffic engineering services. x) Mr. Iranitalab will perform technical studies to support Active Transportation and Safe Routes to School programs.
xi) Mr. Iranitalab will provide technical support for Transportation System Management and Operations TSMO).
xii) Mr. Iranitalab and team will prepare or review stage construction and worksite traffic control plans when applicable).
xiii) Mr. Iranitalab and team will design transportation, roadway, and Complete Streets including construction drawings or plans, specifications, engineer’ s cost estimate and contract bid documents. xiv) Mr. Iranitalab, Mr. Kelley, and team will handle construction management and inspection support services for roadway improvement and transportation projects. xv) Mr. Iranitalab will assist and provide technical assistance in identification and preparation of various traffic and roadway improvement grant opportunities and applications. xvi) Mr. Iranitalab will process and prepare Traffic Commission, Planning Commission and City Council reports and recommendations, and assist in the presentation on an as needed basis. xvii) Traffic Signal System Operations system management. xviii) Provide Traffic Data Collection on an as needed basis). b) Mr. Iranitalab’ s services will be provided on an as needed basis. Willdan and team will acknowledge receipt of requests for services within two 2) working days. Traffic engineering services not specifically identified in previous subtasks, may be performed by the Consultant at the discretion of the City Engineer and Development Services Director.
6) Plan Check Services
i) Manage, coordinate, and oversee the encroachment and wide load permits and plan checks, and inspections.
ii) Answer technical questions from the public, including inquiries regarding public right of way safety codes and regulations.
iii) Perform plan checks.
iv) Assist in a range of inspections as assigned by City staff. v) Ensure that all City Engineering inspections and plan reviews are conducted in an efficient and courteous manner that is responsive to the City and community needs. b) Confirm type of construction, and review construction specifications to determine satisfaction of safety requirements.
c) Check for compliance with applicable codes adopted by the City, and any applicable adopted local amendment, State of California codes or regulations.
d) Calculate encroachment permit and plan check fees, and review permit issuance. e) Review and evaluate engineering geology and geotechnical engineering reports. Provide City staff with specific recommendations regarding the acceptability of such reports and provide detailed review comments to bring the report in compliance with City requirements, as it relates to all level of development, when given reports from the City Building and Safety Department. i) Review foundation and grading plans for proposed development projects, to ensure compliance with applicable geotechnical recommendations.
f) Provide expedited plan check when requested by the City. 7) Public Works Construction Projects
a) Mr. Kelley and staff will analyze/ study improvement projects and prepare preliminary engineering analysis, cost estimate and feasibility studies for various Public Works improvements. b) Mr. Kelley and staff will prepare detailed plans, specifications, bid and contract documents for Public DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 252 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 16 ends

Works construction projects. In addition, the staff will prepare a final cost estimate, required applications of approval of the construction by other governmental agencies, and assist the City in negotiating the acquisition of any necessary right of way or easement.
c) Mr. Kelley and staff will assist the City in the review of bids submitted for construction, in the selection of qualified contractors and in the inspection of construction work. Mr. Kelley will provide general supervision of the contract for Public Works construction projects. d) Mr. Kelley will inspect for compliance and conditions of approval set forth by the City’ s Development Services Department, Planning Commission, and/ or City Council. e) Mr. Kelley will coordinate with various City and County agencies and departments, including but not limited to the Orange County Sanitation District OCSD) and the Rossmoor Los Alamitos Sewer District, and the other governmental agencies providing services, and/ or having jurisdiction over any aspects of a development project to obtain compliance with the applicable public right of way safety code regulations. 8) Capital Project Management
a) Mr. Kelley will Identify capital projects and document budget, scope, schedule, status, organizational responsibility including other Professional Engineering Firms) and funding sources with city direction. b) Mr. Kelley will organize and prioritize all capital projects, with regular reporting and monitoring processes to ensure implementation and completion of scheduled project tasks with city direction. c) Mr. Kelley will track and monitor project status and specific milestone completion, facilitating the discussions and decisions necessary to keep projects on schedule. d) Mr. Kelley will identify and report concerns regarding meeting capital projects goals to the Development Services Director on a monthly basis or as needed).
e) Mr. Kelley will process payments including Gas Tax and other grant funding, monitor budget expenditures and assist with the review of contracts, proposals, invoices and Purchase Orders PO). f) Mr. Kelley will create and store computer files, computer copies, and other types of records and files of work performed for the City using the systems designated by the Development Services Director. g) Mr. Kelley will ensure all applicable local, state and federal laws are adhered to including prevailing wages. h) Mr. Kelley will provide public information regarding encroachment and wide load permit applications, plan check, inspection services and related matters.

Related Experience
Los Alamitos Project Experience
As part of our work for the City of Los Alamitos, Willdan has been involved in providing a variety of services across multiple disciplines. Below is a small list of projects we have completed and staff augmentation services we have provided to date:

City Engineering Services, since 2009 General Municipal Engineering Services) Traffic Engineering Services, since 2009 Traffic and Transportation Engineering Services) Provide construction management, public works inspection, and labor compliance for the City' s 2022 CIP Measure Y Paving Project, 2022 Construction Management/ Inspection Services, Labor Compliance) Pavement Management Plan Updates, 2019 Traffic and Transportation Engineering Services) Recent CDBG funded street resurfacing projects on Howard Avenue, Noel Street and Bloomfield Street, 2020 2022 Traffic and Transportation Engineering Services) Fenley Pump Station Rehabilitation Project General Municipal Engineering Services) Citywide Arterial Sign Replacement Project, 2020 2022 Traffic and Transportation Engineering Services) Old Towne West Traffic Calming Striping Project, 2020 2022 Traffic and Transportation Engineering Services)
Cerritos Avenue Restriping Project, 2022 Traffic and Transportation Engineering Services) DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 253 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 17 ends

Suburbia SB 1 Neighborhood Resurfacing Project, 2021 Traffic and Transportation Engineering Services) Greenbrook, Farquhar and Little Cottonwood SB 1 Neighborhood Resurfacing Project, 2019 Traffic and Transportation Engineering Services)
Los Alamitos Blvd Median Improvement Project, 2017 Traffic and Transportation Engineering Services) On Call Citywide Concrete Improvements Construction Management, 2014 Construction Management/ Inspection Services)
The Commercial Street Improvement Design and Construction Management, 2013 Construction Management/ Inspection Services)
Museum Roof Repair Design and Construction Management, 2013 Construction Management/ Inspection Services)
Old Town East and West Improvement Design and Construction Management, 2013 Construction Management/ Inspection Services)
Cerritos/ Humboldt Intersection Improvements, Carrier Row ADA Ramps, Calle Lee/ Corporate Center Drive Street Rehabilitation, Katella/ Siboney Catch Basins, and Via El Mercado Street Rehabilitation Design and Construction Management, 2012 Construction Management/ Inspection Services) Public Works Yard Gas Tank Removal Design and Construction Management, 2012 Construction Management/ Inspection Services)
Laurel Park Rehabilitation Design and Construction Management, 2012 Construction Management/ Inspection Services)
Citywide ADA Accessibility Ramps Design and Construction, 2012 Traffic Engineering and Construction Management/ Inspection Services)
Citywide ADA Accessibility Ramps Design and Construction, 2012 Traffic Engineering and Construction Management/ Inspection Services)
Projects Examples
Due to Willdan’ s commitment to meet and regularly exceed client expectations, we have served many cities, counties, and special districts for decades. The following experience matrix summarizes some of Willdan’ s relevant experience. Given our long history of providing a full suite of city engineering, public works, and financial services to a multitude of clients, this is just a small excerpt of our most recent contract services.

Client
Civil Traffic Engineering
Design Construction Management
Geotechnical Material Testing
Survey Mapping Environmental
Compliance Plan Check
Federal/ State Funding Project
Assistance Assessment District
Engineering Environmental Compliance City
of Bakersfield City
of Bell City of
Calabasas City of Calimesa
City of Camarillo
City of Elk Grove
City of Fillmore
City of Hawaiian
Gardens City of Hughson City of La Puente

Page 254 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 18 ends

City of Rolling Hills Estates
City of Rosemead
City of Santa Paula
City of Thousand Oaks
City of Ventura
City of Westlake Village
City of Yorba Linda
County of Fresno
County of Kern
County of Madera
County of Orange
County of San Bernardino
General Municipal Engineering Services
Client: City of Paramount
Services Provided General Engineering Services Dates: 1978 Ongoing City Engineer
Traffic Engineer
Civil Engineering
Traffic Engineering
Landscape Architecture
Storm Drain Engineering
Sanitary Sewer Engineering
Funding Administration
Grant Writing
Project Management
Environmental Documentation
Survey/ Right of Way Engineering
Development Review
Regulatory Permit
Public Outreach
Construction Engineering
Construction Management
Construction Inspection
ADA Compliance
Assessment District Engineering
Geotechnical Engineering
Materials Testing
GIS Mapping and Database
Potable Water Distribution
Storm Water Quality/ Master Plan
Labor Compliance
Miscellaneous Tasks
Client: City of Lakewood
Services Provided General Engineering Services Dates: 2000 Ongoing Civil Engineering
Traffic Engineering
Landscape Architecture
Storm Drain Engineering
Sanitary Sewer Engineering
Funding Administration
Grant Writing
Environmental Documentation
Project Management Survey/ Right of Way Engineering
Development Review
Regulatory Permit
Public Outreach
Construction Engineering
Construction Management
Construction Inspection
Geotechnical Engineering
Materials Testing
GIS Mapping and Database
Potable Water Distribution
Storm Water Quality/ Master Plan
ADA Compliance
Assessment District Engineering
Labor Compliance
Miscellaneous Tasks
Client: City of Bell
Services Provided As Needed Engineering Services Dates: 2014 Ongoing City Engineer
Traffic Engineer
Civil Engineering
Traffic Engineering
Landscape Architecture
Storm Drain Engineering
Sanitary Sewer Engineering
Funding Administration
Grant Writing
Project Management
Environmental Documentation
Survey/ Right of Way Engineering
Development Review
Regulatory Permit
Public Outreach
Construction Engineering
Construction Management
Construction Inspection
ADA Compliance
Assessment District Engineering
Geotechnical Engineering
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 255 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 19 ends

Materials Testing
GIS Mapping and Database
Potable Water Distribution
Storm Water Quality/ Master Plan
Labor Compliance
Event Based Planning Operations
Miscellaneous Tasks
Client: City of La Puente
Services Provided City Engineering Services Dates: 2009 Ongoing City Engineer
Traffic Engineer
Civil Engineering
Traffic Engineering
Landscape Architecture
Storm Drain Engineering
Sanitary Sewer Engineering
Funding Administration
Grant Writing
Project Management
Environmental Documentation
Survey/ Right of Way Engineering
Development Review
Regulatory Permit
Public Outreach
Construction Engineering
Construction Management
Construction Inspection
ADA Compliance
Assessment District Engineering
Geotechnical Engineering
Materials Testing
GIS Mapping and Database
Potable Water Distribution
Storm Water Quality/ Master Plan
Labor Compliance
Miscellaneous Tasks
Client: City of Rolling Hills Estates
Services Provided General Engineering Services Dates: 1998 Ongoing City Engineer
Traffic Engineer
Civil Engineering
Traffic Engineering
Landscape Architecture
Storm Drain Engineering
Sanitary Sewer Engineering
Funding Administration
Grant Writing
Project Management
Environmental Documentation
Survey/ Right of Way Engineering
Development Review
Regulatory Permit
Public Outreach
Construction Engineering
Construction Management
Construction Inspection
ADA Compliance
Assessment District Engineering
Geotechnical Engineering
Materials Testing
GIS Mapping and Database
Potable Water Distribution
Storm Water Quality/ Master Plan
Labor Compliance
Miscellaneous Tasks
Geotechnical Engineering Services
Client: City of Diamond Bar
Services Provided On Call Geotechnical Services Dates: 2003 Ongoing Willdan provides review of geotechnical and engineering geology reports and plans submitted by developer’ s soils engineers and/ or engineering geologist using City established policies and procedures and within City timeframes. Prepare review comments and conditions of approval. Review responses to review comments provided by the developer’ s geotechnical consultant and work with developer’ s soils engineer to resolve issues generated by review comments. Attend meetings with developers, builders, engineers, and consultants in a timely manner to resolve issues generated during the report review process or during construction. Review soils reports submitted by the developer’ s geotechnical consultant for proposed changes during grading. Provide technical support to the City for geotechnical engineering and geologic related issues on an as needed basis.

Client: City of Calabasas
Services Provided Land Development Services Dates: 2003 Ongoing Willdan provides review of geotechnical and engineering geology reports and plans submitted by developer’ s soils engineers and/ or engineering geologist using City established policies and procedures and within City timeframes. Prepare review comments and conditions of approval. Review responses to review comments provided by the developer’ s geotechnical consultant and work with developer’ s soils engineer to resolve issues generated by review comments. Attend meetings with developers, builders, engineers, and consultants in a timely manner to resolve issues generated during the report review DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 256 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 20 ends

process or during construction. Review soils reports submitted by the developer’ s geotechnical consultant for proposed changes during grading. Provide technical support to the City for geotechnical engineering and geologic related issues on an as needed basis.

Client: City of Pomona
Services Provided General Engineering Services Dates: Dec. 2018 Aug. 2019 Willdan performed geotechnical and material special inspection and testing during the construction of the project. Our services included observation and testing of subgrade preparation and grading activities; inspection, sampling and testing of concrete and reinforcement; performing required laboratory testing of construction material; and providing quality control for the construction.

Client: City of Irvine
Services Provided General Engineering Services Dates: Nov. 2018 Nov. 2020 Willdan performed geotechnical and material special inspection and testing during the construction of the project. Our services include observation and testing of subgrade preparation and grading activities; inspection, sampling and testing of concrete and reinforcement; performing required laboratory testing of construction material; and providing quality control for the construction.

Traffic and Transportation Engineering Services
Client: City of Downey
Services Provided Traffic Engineering Design Dates: May 2017 Ongoing Willdan will provide professional traffic engineering services for the Paramount Boulevard Traffic Signal Upgrades and Safety Enhancements Project from Gardendale Street to Telegraph Road. The project included conducting an environmental analysis, performing a traffic safety assessment, and preparation of design plans specifications and estimates PS& E) for the installation of traffic signal upgrades and safety enhancements at thirteen 13) signalized intersections. The purpose of this project is to improve traffic safety along Paramount Boulevard by implementing traffic signal. Other safety enhancements include upgrade of curb ramps to be ADA compliant to improve safety for pedestrians and bicyclists. All of these improvements increased traffic signal visibility facilitate safer turning movements and reduce pedestrian and bicyclist involved collisions.

Client: City of Inglewood
Services Provided Traffic Engineering Design Dates: May 2018 December 2020 Willdan provided engineering design and system integration for the preparation of plans specifications and estimates PS& E) for the LAWA ITS Improvements at various locations throughout the City. The project limits include Century Boulevard from La Cienega Boulevard to Van Ness Avenue and La Cienega Boulevard from Florence Avenue to Century Boulevard. The design will generally consist of installing twelve 12) Changeable Message Signs CMS) at various locations in the City traffic signal modifications at twenty two 22) locations including but not limited to 2070 ATC controller cabinet upgrades video detection advanced loop detection CCTV cameras main HUB and communications equipment. The design also includes installation of a secondary fiber optic cable and conduit system along Century Boulevard from La Cienega Boulevard to Van Ness Avenue and a new fiber optic and conduit system on La Cienega Boulevard from Florence Avenue to Century Boulevard including a vault or hub at La Cienega Boulevard Century Boulevard for City of LA and Caltrans to potential connect in the future. No work is anticipated to be performed on the traffic signals at Century Boulevard and La Cienega Boulevard since it’s maintained by the City of LA and the La Cienega Boulevard 405 on/ off ramps since it is Caltrans maintained. The project excludes coordination and communication connections with City of Los Angeles and or County of Los Angeles but does include coordination with Caltrans for an encroachment permit at the signalized intersection of Century I 405 freeway on/ off ramps. The Willdan team is comprised of Willdan Engineering who will perform the design by preparing the PS& E for the project and Kimley Horn and Associates Inc who will perform the ITS integration and fiber assignment component for the project.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 257 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 21 ends

Client: City of Santa Monica
Services Provided Traffic Engineering Design Dates: May 2019 April 2021 Willdan provided professional engineering design services for the preparation of design plans and construction bidding documents for the installation of 78 EV charging stations to be installed at City owned parking lots and curb side locations. The project will be phased over two fiscal years 2018 19 and 2019 20. The design work includes performing topographic surveys; utility coordination including coordinating with Southern California Edison for new meters and transformers; preparation of drawings showing new conduits and charging locations including electrical calculations; preparation of temporary traffic control plans; cost estimates; bidding and construction phase support; and the completion of as built record drawings at the conclusion of construction.

Client: City of El Monte
Services Provided Street Design Cedar Ave, Lower Azusa
Rd, And City Limit Area Zone 2) Street
Improvement Project
Dates: 2020 2022
The project included resurfacing over 8 1/ 2 miles of local streets in the northwest section of the city. The adjacent properties are developed with primarily residential homes with a few church, school, and commercial uses. The project involved three different resurfacing strategies grind and overlay, cape seal, and slurry seal. Including the various pavement strategies provides an advantage to monitor the construction budget during the design process and revise the pavement strategies as necessary to maximize the pavement life of the improvements while keeping costs within the City’ s construction budget.

Client: City of Buena Park
Services Provided Street Design Malvern Street Rehab Dates: 2022 Ongoing Willdan is providing engineering design services, including preliminary engineering, surveying, and preparation of plans, specifications and estimates for assessment of the existing pavement conditions of a section of Malvern Avenue and its repair.

Improvements for the project include pavement rehabilitation on roadways segments; parkway improvements, such as reconstruction of existing damaged and uplifted concrete sidewalk, cross gutter drainage improvements, curb and gutter, Class II Bike lane additions, and drive approaches. Curb ramps are to be installed or reconstructed to ensure compliance with ADA requirements, as well as design survey and utility adjustments, pavement assessments, signing and striping, and replacement of traffic loops.

Construction Management Inspection Services
Client: City of Downey
Services Provided On Call Multidisciplinary Engineering Services
Dates: 2001 Ongoing
Willdan has provided on call engineering services to the City of Downey since 2001. In that time, Willdan has completed over 60 projects for the City, providing a multitude of services such as construction management and inspection, materials testing, plan checking, design engineering, landscape architectural, surveying, GIS, geotechnical engineering, and planning services.

Representative construction management projects completed under this on call contract include Lakewood Boulevard Water Improvements, Firestone Boulevard at Paramount Boulevard Intersection Improvements, Lakewood Boulevard Improvements Phase 3C, Paramount Boulevard Water Improvements, Woodruff Avenue Water Improvements, Samoline Avenue and Melva Street Water Improvements, Third Street Water System Improvements, Old River School Road Rehabilitation STPL), Wilderness Park Sewer improvements, Fifth Street Water Improvements, Police and Library Pier Observation, Solar PV System at Five City facilities, Cole Street Water Improvements, Pellet and Ryerson Water Improvements, Well No. 30 Discharge Pipeline, Woodruff and Smallwood Sewer Repairs, and Patton Road Water Main Improvements. Willdan provided construction management, inspection, and materials testing services for each of these projects.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 258 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 22 ends

Client: City of Inglewood
Services Provided On Call Multidisciplinary Engineering Services
Dates: 2011 Ongoing
Willdan has provided on call engineering services to the City of Inglewood since 2011. In that time, Willdan has completed over 22 projects for the City, providing a multitude of services, such as construction management and inspection, plan checking, design engineering, landscape architectural, surveying, and GIS. Representative construction management and inspection projects completed under this on call contract include La Brea Avenue Reconstruction DEMO4L), La Brea Avenue Realignment and Reconstruction HPLUL), Annual Streets and Alleys Rehabilitation, Imperial Highway Improvements, Prairie Avenue Improvements, Van Ness Avenue Improvements, Inglewood Intermodal Transit/ Park and Ride Facility, Service Center Yard Roofing Project, Intelligent Transportation System Gap Closure, Intelligent Transportation System Phases 5 6, Los Angeles World Airports Intelligent Transportation System, City Parking Lots Rehabilitation, La Brea and Hardy Traffic Signal Improvements, Century Boulevard Mobility Project Federal Funding Closeout Services, La Tijera Elementary School Improvements SR2S), and Encroachment Permits Inspection.

Client: City of Ridgecrest
Services Provided On Call Multidisciplinary Engineering Services
Dates: 2010 Ongoing
Willdan has provided on call engineering services to the City of Ridgecrest since 2010. In that time, Willdan has completed over 75 projects for the City, providing a multitude of services, such as construction management and inspection, plan checking, design engineering, grant administration, labor compliance, city engineering, landscape architectural, surveying, GIS, environmental clearance, building and safety. We have provided these services to the City for projects funded with local, state, and federal funds. Representative construction management and inspection projects completed under this on call contract include Downs Street Widening STPL), West Ridgecrest Boulevard Reconstruction RPSTPL), Ridgecrest Senior Center Tenant improvements CDBG), Electric Vehicle Charging Stations and Solar Photovoltaic Improvements CMAQ), Corporate Yard Site Improvements, New Bus Maintenance Garage and Shade Structure Design/ Build), ADA Transition Plan CDBG), Sewer System Rehabilitation and Repair Program, Sewer GIS mapping, Walmart Supercenter Offsite Improvements, Richmond Road Bike Path, Bowman Channel Improvements, Dolphin Avenue Improvements CMAQ), SSARP, Traffic Signal Installation for China Lake Boulevard at Bowman Road HSIP), Citywide Telecommunications Installation Permit Inspection, Flashing Stop Signs and Adaptive Traffic Signals HSIP), and Leroy Jackson Park Clean CA). On many of these projects, Willdan provided turnkey services including design, environmental, bidding assistance, construction management, inspection, labor compliance, grant administration and materials testing.

Client: City of Santa Ana
Services Provided On Call Construction management Dates: 2020 Ongoing Willdan provided public works and on call construction management inspection services for various projects throughout the City. Through our on call contract, Willdan provided public works inspection and testing services for the Riverview Neighborhood Water Main improvement project, consisting of approximately 5,750 linear feet LF) of 8 inch, and 2,600 LF of 12 inch PVC C 900 water mains and all appurtenances. The project also included removal and reconstruction of minor concrete improvements. Willdan reviewed the existing parking lot and public buildings located within the City' s Maintenance Yard.

Willdan provided a list of repairs and estimated cost for the identified issues. Additional, material testing services were also included for Warner Avenue and various projects throughout the city.

Landscape Architectural Services Inspections
Client: City of Bell
Services Provided As Needed Engineering Services Dates: 2018 Ongoing Willdan is providing as needed city and traffic engineering services. In addition to providing extension of staff services, Willdan specifically provided landscape architecture plans, specifications, and estimates, for the City’ s Clarkson Avenue Green Street DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 259 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 23 ends

Improvements. Willdan provides engineering design, construction management, project management, development review, pavement engineering, funding administration, plan review, surveying/ right of way engineering/ mapping, and geotechnical engineering services throughout the city. These services encompass but are not limited to study and report research and preparation; plan, specification, and cost estimate preparation; funding application research, preparation, and submittal; citizens' request and complaint investigations/ resolutions; development impact studies; City staff, commissions, and council meeting attendance; and City department coordination to implement desired improvements and updates.

Client: City of Lakewood
Services Provided General Engineering Services Dates: 2008 Ongoing For over 20 years, Willdan has been providing landscape architecture, engineering design, construction management and inspection, project management, development review, pavement engineering, funding administration, survey/ right of way engineering/ mapping, and geotechnical engineering services throughout the city. These services encompass but are not limited to study and report research and preparation; plan, specification, and cost estimate preparation; funding application research, preparation, and submittal; citizens' request and complaint investigations/ resolutions; development impact studies; City staff, commissions, and council meeting attendance. Willdan specifically provided landscape architecture plans, specifications, landscape inspections, and estimates, for the City’ s Lakewood Boulevard at Del Amo Boulevard streetscape improvements and Paramount Boulevard water conservation medians renovations.

Client: City of La Puente
Services Provided General Engineering Services Dates: 1996 Ongoing Willdan is providing as needed city and traffic engineering services to the City of La Puente. In addition to providing extension of staff services, Willdan provides landscape design and inspection services, engineering design, construction management, project management, development review, pavement engineering, funding administration, plan review, surveying/ right of way engineering/ mapping, and geotechnical engineering services throughout the city. These services encompass but are not limited to study and report research and preparation; plan, specification, and cost estimate preparation; funding application research, preparation, and submittal; citizens' request and complaint investigations/ resolutions; development impact studies; City staff, commissions, and council meeting attendance and participation; and City department coordination to implement desired City improvements and updates.

Client: City of Paramount
Services Provided General Engineering Services Dates: 2011 2012 Willdan completed program management services for a unique park in the City of Paramount. Funding for this 8 acre park development was available through a park grant from Proposition 84 funds. Willdan was involved with this project from planning through design and through construction including grant application submittals and inspections. The park included synthetic turf play field a 400 meter walking running track multi use soft footed trails exercise stations parking lots security lighting and decorative tubular steel fencing enclosing the entire park. The park site was within Southern California Edison’ s SCE) right of way which required a lengthy review process and adherence to all requirements set forth in SCEs conditions of approval. Approvals were also required from the Metropolitan Water District and Central Basin Municipal Water District.

Willdan’ s program management scope of work included the following: design management, civil engineering, landscape architecture and inspection, constructability reviews review and award of general contractors contract, RFI management, submittal management change order management, observation of construction activity, utility coordination, materials testing construction staking, conducting progress review meetings, cost monitoring control, Federal labor compliance monitoring, schedule monitoring, control review recommendation of general contractors monthly payment application and project closeout management.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 260 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 24 ends

Surveying Services
Client: City of Yorba Linda
Services Provided On Call Survey Dates: 2001 Ongoing
Willdan provided Subdivision Map Checking, as well as Easement, Lot Line Adjustment, and Lot Merger Checking for 20 years.

We have also provided technical advice on a number of high profile items such as the new library, and currently, on modifications to the Nixon Library. Our largest job to date has been the quitclaiming of Landscape Easements dedicated to the City by dedication on a subdivision map or by individual deed. This quitclaiming has resulted in a huge cost savings for the city.

Client: City of La Cañada Flintridge
Services Provided On Call Public Works Services Dates: 1999 Ongoing Willdan provides checking services for all Parcel Maps, Tract Maps, Lot Line Adjustments, Lot Mergers, and Certificates submitted to the City. In addition, Willdan’ s survey group updated a topographic survey of city hall to show updates for handicapped access and other changes. We then prepared a number of ingress/ egress easements for use of the pre school to the east. In an action not specifically for the City, Willdan’ s expert witness, David Knell, represented the city’ s interest in the matter of Tripathi v. City of La Canada Flintridge.

Client: City of La Puente
Services Provided On Call Public Engineering Services Dates: 1996 Ongoing Willdan provides land development and associated infrastructure improvement reviews encompassing civil infrastructure, grading, soils, traffic, floodplain management, environmental studies, and permit application requests. Maps are reviewed for conformance with the California Subdivision Map Act. Additional land development related services provided under the contract involve contract extension of staff services for Deputy City Engineer, Traffic Engineer, City Surveyor, and Public Works Inspector; project management; development review meeting attendance; and independent assurance sampling and testing.

Client: City of Paramount
Services Provided On Call Public Engineering Services Dates: 1978 Ongoing Willdan provides land development and associated infrastructure improvement reviews encompassing civil infrastructure, grading, soils, traffic, floodplain management, environmental studies, and permit application requests. Maps are reviewed for conformance with the California Subdivision Map Act. Additional land development related services provided under the contract involve contract extension of staff services for Deputy City Engineer, Traffic Engineer, City Surveyor, and Public Works Inspector; project management; development review meeting attendance; and independent assurance sampling and testing.

Storm Water Quality Services
Client: Cities of Westlake Village, Anaheim, Bell
Services Provided NPDES Management Dates: 2022 Ongoing
Willdan is performing Municipal NPDES Permit Management, including Total Maximum Daily Load monitoring, management, and mitigation
Client: City of Agoura Hills
Services Provided Stormwater Services Dates: 2022 Ongoing Willdan is providing stormwater services and will assist the Engineering Division on an as needed basis in implementing the City' s Storm Water Program, TMDLs and related regulations. Services to be provided include the following tasks: Prepare City' s DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 261 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 25 ends

NPDES Annual Report, conduct City' s commercial and wet weather inspections, Malibu Creek Watershed group coordination, assist the City in preparing cost estimates relating to the NPDES/ Stormwater Program for the City' s annual budget, attend/ conduct staff meetings and/ or training, providing support for Nutrients Study and Measure W, and providing a mobile detailer investigation and response, and developing public outreach. Additional services may include real property services, environmental planning, municipal planning, engineering services, construction management, development review, capital projects, grantsmanship, and related work.

Client: City of San Fernando
Services Provided Stormwater Services Dates: 2022 Ongoing Implement the City' s Enhanced Watershed Management Plan, Coordinated Integrated Watershed Management Plan, and NPDES permits. PM will attend meetings on behalf of the client; document review. PM will support staff with City Council report and presentations. PM will also conduct as needed briefings to the public, city staff, and City Council.

Client: City of La Cañada Flintridge
Services Provided Stormwater Services Dates: 2022 Ongoing Implement the City' s Enhanced Watershed Management Plan, Coordinated Integrated Watershed Management Plan, and NPDES permits. PM will attend meetings on behalf of the client; document review. PM will support staff with City Council report and presentations. PM will also conduct as needed briefings to the public, city staff, and City Council.

Grant Funding Services
Over the past few years, Willdan has provided services for 215 local city and county improvement projects funded with over 10 million allocated through federal and state grant programs a small segment of which are highlighted in the chart. Overall, our project team has been involved in over 1,000 projects funded through programs such as ATP, CDBG, FEMA, ARRA, HSIP, and HBP during the past five years.

Client: City of Moreno Valley
Services Provided CDBG, HOME, ESG, CDBG CV and NSP
Grant Administration Services
Dates: 2020 Present
Willdan is providing Grant Administration Services to administer the City’ s Housing and Urban Development HUD) Programs, Services and Activities Related to Community Development Block Grants CDBG), Community Development Block Grant Corona Virus funds CDBG CV), Home Investment Partnership Program HOME), Emergency Solution Grant ESG), and Neighborhood Stabilization Program Grant NSP). Successful grant closeout of NSP3 and NSP1.

Client: City of Cudahy
Services Provided CDBG and HOME Programs Assistance Dates: 2019 2021 Willdan provided technical advisement to CDBG staff related to the implementation of their CDBG programs.

Client: City of La Verne
Services Provided Housing Rehabilitation Program and
Grant Administration ARPA)
Dates:

Willdan is providing technical assistance with the administration of the City’ s American Rescue Plan Act ARPA) funded Housing Rehabilitation Program.

Client: City of Torrance
Services Provided Rental Assistance Program CDBG CV) Dates: 2021 2022 Willdan staff members provided guidance and assistance to a Los Angeles Urban County Community Development Block recipient helping the recipient create and administer a CDBG CV funded rental assistance program to alleviate the COVID 19 rental housing crisis.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 262 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 26 ends

Recent Grant Funded Improvement Projects
Type Quantity Description Funding Amount
ATP 1 Bike Path/ Creek Extension 788, 000
CDBG 10 Playground/ Park/ Facility 613,155
CDBG 1 Storm Drain 33,600
CDBG 7 Roadway/ Curb/ Sidewalk 330,942
CDBG 1 Other 16,484
CMAQ 1 Sidewalk 246, 348
FEMA 2 Storm Drain/ Channel 196, 349
FEMA 1 Roadway 53,760
FEMA 1 Bridge 250,000
FEMA 1 Other Service 149,888
HBP 9 Bridges 2,458, 046
HSIP 17 Roadway/ Safety 1,606, 565
Measure L 2 Roadway 157, 980
Other 1 Sewer 47,920
SR2S/ SRTS 1 Roadway/ Safety 44,897
SSARP 1 Safety Study 58,000
STPL 4 Roadway 474,674
TFCA 1 Safety 99,500
Total 7,626, 108
Organizational Chart
The organization chart below identifies the project roles for our team and illustrates the communication, reporting relationships among the team, with discipline leads identified in bold. Willdan’ s proposed team is available to begin work as soon as possible after the selected firm receives the notice to proceed. Resumes for our key staff are provided in a later section of this submittal.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 263 of 469 ends
Page 264 of 469 ends
Page 265 of 469 ends
Page 266 of 469 ends
Page 267 of 469 ends
Page 268 of 469 ends
Page 269 of 469 ends
Page 270 of 469 ends
Page 271 of 469 ends
Page 272 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services 36 Quality Control
Quality assurance and control procedures are critical to ensuring sound engineering practices and quality deliverables are produced for our clients. In accordance with Willdan' s Quality Assurance/ Control Manual, Mr. Adel Freij, PE will serve as the Quality Assurance Advisor. Project specific quality assurance activities will be planned at the beginning of the project. Typical QA/ QC activities include assigning the appropriate technical staff to the project, selecting the proper project technical approach, establishing a project schedule that meets internal Willdan and City deadlines, and determining the proper level of QA/ QC review.

There are four review levels for project deliverables:

Level 1 Peer review only
Level 2 Peer review and editorial review documents)
Level 3 Peer review, editorial review, and engineer review Level 4 All elements of Level 3 plus additional reviews by specific technical experts The two major components of the quality assurance review are technical and communication reviews. A Level 3 review will be performed on engineering design plans, specifications, and cost estimate to ensure the design is sound, constructible, and appropriate for the intended use and to confirm deliverables meet the scope of work requirements. This process involves reviews by independent designers and the Project Manager prior to submittal for formal review under the agreed upon project specific quality assurance plan. Project documents, including letters and correspondence, are subject to a Level 2.

Project Controls
Willdan’ s project control system is designed to provide a coordinated effort between all task facets of a project in the framework of the pre established master schedule, budget controls, and reporting system. The project control system provides an objective measure of performance integrating the following functions:

The work breakdown structure subdivides the work into
manageable segments and is the basis for our project
managers’ project control plan. The work breakdown
structure is tailored to specific project needs, but generally has typical elements, including codes to identify work
segments and engineering disciplines, weekly reports, and project resources schedule.

To monitor labor costs, each person performing work on a project completes a weekly timecard that identifies the project, segment of work, and engineering discipline by code. Man hour summary reports are developed weekly from the timecards and are issued to our project manager for review. Each project manager then updates the schedule. This simple system provides accountability for Willdan’ s payroll, billings, and progress reporting and serves as the basis for all cost related project management data.

Cost Controls
The budget control system is prepared in accordance with the work breakdown structure. The budget becomes the control against which performance is measured. The budget is time phased by combining project master scheduling data with budget data. Actual costs are compared with budgeted costs and variances analyzed. Deviations between planned and actual cost can then be evaluated to forecast and control future work.

Work Breakdown Structure
Budget Control System
Master Schedule Control System
Progress Reporting
Work Breakdown Structure
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 273 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 37 ends

Beginning with electronic timekeeping, project hours are assigned to the appropriate tasks and subtasks and booked as work in process. Pre bill reports are generated that identify the hours to be billed along with any other direct charges to the project. This is the information used to determine each month' s invoicing. Once hours and charges are billed, they are shifted from Work in Process to Accounts Receivable to ensure that billed hours are inactivated. Monitoring is easily accomplished through team member progress updates and comparisons between the scope of work, schedule, and budget.

Schedule Controls
A critical path method master schedule will be prepared following the notice to proceed. The schedule will identify major items of work and will be the vehicle for monitoring, controlling, and tracking progress. The schedule will be updated monthly to reflect actual and forecasted completions. This allows our project managers to anticipate and forecast potential issues and develop an advanced strategy to proactively mitigate problems before they impact the schedule.

If it is determined that a project is falling behind schedule, project managers meet with the respective team members, identify the problem, and ensure that extra support and effort are expended to bring the project back on schedule. Willdan will keep City staff informed of the overall schedule, including advanced notification of any necessary adjustments or actions to remain on track. Project managers monitor all progress on a weekly basis.

Cost Proposal
As requested, we are providing the following hourly rates. A more detailed hourly rate schedule is also attached in the appendix. These rates are reduced from our standard fee schedule based on the longstanding working relationship we have with the City of Los Alamitos.

Job Description Hourly Rate
City Engineer 160
Geotechnical Manager 185
Landscape Architect 175
Labor Compliance Manager 165
Traffic Engineer 160
Project Manager 158
Public Works Superintendent 150
No subconsultants are expected to be necessary at this time. Should one be needed at a later date, their respective rates will be provided at that time.

References
Over the past 58 years, Willdan has provided municipal services to more than 400 municipalities, for projects involving a broad array of disciplines. The following briefly summarizes some of the firm’s relevant on call services experience performed for various clients. Client references have been provided for a representative sampling of Willdan’ s contracts. We encourage the City to contact the listed agencies to verify Willdan’ s commitment to excellence, project schedules, and project budgets.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 274 of 469 ends

City of Los Alamitos RFP No. 2022 05
Proposal for City Engineering and Traffic Engineering Services

Page 38 ends

Client: City of Rolling Hills Estates
Address: 4045 Palos Verdes Drive North, Rolling Hills Estates, CA 90274 Contact: David Wahba, Director of Public Works
310) 377 1577 x 103, DavidW@RollingHillsEstates. gov
Services: City Engineer, Project Management, Civil Engineering, Traffic Engineering, Landscape Architecture, Construction Management and Inspection, Material Testing, Engineering Plan Check, Pavement Engineering, Encroachment Permits, Building and Safety.

Client: County of Orange
Address: 601 North Ross Street, Santa Ana, CA 92701
Contact: Bea Jimenez, Division Manager Land Development 714) 667 8852, beabea. jimenez@ocpw. ocgov. com
Services: Engineering Plan Check Services
Client: City of La Canada Fintridge
Address: One Civic Center Drive, La Canada Flintridge, CA 91011 Contact: Maged El Rabaa, P.E., City Engineer
818) 790 8882 x 205, cityengineer@lcf. ca.gov
Services: Traffic Engineering, Engineering Plan Check, Civil Engineering, Construction Management and Inspection, Labor Compliance.

Client: City of Paramount
Address: 16400 Colorado Avenue, Paramount, CA 90723
Contact: Adriana Figueroa, Director of Public Works
562) 220 2100, AFigueroa@paramountcity. com
Services: City Engineering, Project Management, Civil Engineering, Traffic Engineering, Water Engineering, Public Works Permits/ Inspection, Development Review, CIP and Facilities Design/ Inspection, CDBG Administration, Grant Writing and Funding Administration, NPDES, Geotechnical Engineering, Survey, Landscape Architecture, Construction Management, Right of Way Engineering, Map Plan Check.

Client: City of La Puente
Address: 15900 East Main Street, La Puente, CA 91744
Contact: Mr. John Di Mario, Development Services Director 626) 855 1517 jdimario@lapuente. org
Services: City Engineering, Civil Engineering, Traffic Engineering, Grants and Funding Administration, Development Review, Geotechnical Engineering, Survey, Landscape Architecture, Labor Compliance, Construction Management, Planning, Building and Safety.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 275 of 469 ends

Resumes of Proposed Personnel
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 276 of 469 ends

Adel Freij, PE
Project Role: Principal in Charge
Job Classification: Director
Profile Summary
Education: BS, Civil Engineering, University of Missouri, Kansas City Resident Engineer Academy
Credentials: Civil Engineer, California No. 55564
Experience: 35 Years
Adel M. Freij is the Director of City Engineering at Willdan, overseeing staff augmentation to provide city, county, and regional engineering services. He is an accomplished manager in assisting clients to serve their constituents, with temporary, as needed assistance or long term assignments. Mr. Freij provides innovative solutions in engineering and construction management services for large scale multi discipline public works projects, working diligently to meet clients’ budgets and schedules. His areas of expertise include Capital Improvement Program CIP) implementation, annual budget preparation, funding and grant administration, Stormwater and National Pollutant Discharge Elimination System NPDES) guidelines, and Americans with Disabilities Act ADA) requirements. Mr. Freij is a proficient negotiator and collaborator with well developed decision making and organization skills.

Relevant Project Experience
As Needed Engineering Services, Various Cities, California. Mr. Freij served as Willdan’ s primary point of contact and managed As Needed and On Call Engineering Services for the cities of La Puente, Bell, Azusa, San Fernando, South Gate, Inglewood, Hawaiian Gardens, Rosemead, Maywood, Placentia, Lynwood, and Grand Terrace.

Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood, California. Project Manager. Willdan provided design engineering services to prepare plans, specifications, and estimates PS& E) for complete green street improvements on Lakewood Boulevard between the north city limit and Del Amo Boulevard. Improvements involved street widening and median improvements; Class II bike lanes in both directions; turn lanes; landscape planting and irrigation; overhead distribution and transmission power undergrounding; sidewalk curb and gutter and driveway approach reconstruction; street resurfacing; catch basin construction; storm water quality improvements to comply with Green Streets policy; bike lockers bus shelter and traffic signal modifications. Willdan services included civil, traffic, pavement, drainage, geotechnical engineering, landscape architecture, survey and right of way engineering, utility coordination and relocation, preparation of an initial study checklist and a mitigated negative declaration pursuant to the California Environmental Quality Act.

Garfield Avenue Improvements, City of Paramount, California. Project Manager. Willdan provided design engineering services to prepare plans, specifications, and estimates PS& E) for street improvements through the Garfield Avenue corridor between the north and south city limits. The design involved street widening to accommodate a third lane in each direction; street resurfacing; concrete sidewalk curb and gutter and driveway approach re construction; catch basin construction; streetscape improvements for raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic signal modifications at nine locations along the Garfield Avenue corridor. Willdan services included civil, traffic, and drainage engineering design; survey and mapping; utility relocation; landscape architecture; and pavement management. Willdan prepared an initial study checklist and mitigated negative declaration pursuant to CEQA requirements.

Street and Sewer Improvements on Florence Avenue, City of Bell, California. Project Manager. Willdan provided engineering design PS& E), project management, contract administration, construction observation, engineering support, utility coordination, material testing, and labor compliance services for the Street and Sewer Improvements on Florence Avenue Project. The project included cold milling existing AC pavement, ARHM overlay, remove and replace sidewalks, curb, curb and gutter, curb ramps, AC pavement, PCC cross gutter spandrel, trenching, installing VCP sewer, connecting sewer laterals, constructing sewer manholes, adjusting manhole frames to grade, and signing and striping.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 277 of 469 ends

Christopher Kelley, PE, QSD/ P
Project Role: City Engineer
Job Classification: Project Manager II
Profile Summary
Education: BS, Civil Engineering, California Polytechnic State University, Pomona Credentials: Civil Engineer, California No. 83179
Qualified SWPPP Developer and Practitioner, No. 25874
Experience: 17 Years
Mr. Christopher Kelley has more than 17 years of experience in civil engineering. He has provided city engineer, project management, CIP management and implementation, contract administration, supervision of public works inspectors and City staff, coordination of various agencies and consultants, plan check, and general engineering services to such Cities as Los Alamitos, Hawaiian Gardens, Cerritos, and El Monte on an as needed basis. He has assisted the Cities on various projects, including implementing and administering the design and construction of various capital improvement projects, water quality representation; and permitting.

Project Management experience includes:

Street Reconstruction
Street Widening
Medians
Storm Drains
Overlay and Slurry Seal
Sewers
Pump Station
Concrete Repairs
Landscape Improvements
Park Improvements
Best Management Practices BMP) Design
Public Facility Improvements
Relevant Project Experience
City of Los Alamitos, California. Mr. Kelley currently serves as the interim City Engineer and provides the following services: general engineering oversight for CIP implementation, site plan and development reviews, ADA compliance, prepare City Council reports for funding of project and attend meetings, prepare Traffic Commission reports for various citywide traffic related items and attend meetings, coordinate preparation of plans and specifications, award of construction and consulting contracts, project construction, change orders, project funding of Measure M, SB 1, Gas Tax, CDBG, etc., coordination with OCTA, Caltrans, OC Sanitation District, address residents’ complaints, traffic and curb marking requests, issue Public Works permits, perform inspections, etc. Worked on the following CIP projects: Los Alamitos FY 19/ 20 Street Improvement Project, 700, 000. Work included grind and overlay streets, sidewalk, curb and gutter repairs, wheelchair ramp construction, striping, etc. Los Alamitos FY 20/ 21 Street Improvement Project, 1,7000, 000. Work included grind and overlay streets, sidewalk, curb and gutter repairs, wheelchair ramp construction, striping, etc.

Other CIP work includes misc. concrete repairs and street repairs, 200, 000. Manage various City owned facilities repair projects such as the City Hall generator, community center roof, and the City’ s pump station facility.

City of Rolling Hills Estates, California. Mr. Kelley acts as the Special City Engineer for the City of Rolling Hills Estates for various assignments. He manages the encroachment permits and inspections. Willdan Engineering provides design, construction management, and traffic engineering services to the City.

City of Manhattan Beach, California. Mr. Kelley served the City as a Project Manager for a high profile mall renovation project and coordinated all disciplines such as civil, building and safety, planning, geotechnical, inspection and met weekly with development team representatives for project status and assignments.

Plan Checking Services
Mr. Kelley has extensive development review experience in grading, drainage and water quality and service has included the following agencies:

Azusa, Los Alamitos, Irvine Campus Housing Authority, Fontana, County of Orange, San Bernardino, Goleta, San Bernardino, Compton, Lake Elsinore, Cerritos, Brea, El Monte, Hawaiian Gardens, Rolling Hills Estates, Rolling Hills, Manhattan Beach, South Gate, La Puente, Bell, and Camarillo.

Reviews consist of grading and drainage plans, Low Impact Development LID) Reports, WQMPs, SWPPPS, Hydrology Hydraulic Reports, reference to conditions of approval, local ordinances, local and state standards, and coordination with City staff, development engineers, as well as crossover disciplines such as building and safety and geotechnical engineers.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 278 of 469 ends

Farhad Iranitalab, PE, TE
Project Role: Traffic Engineer
Job Classification: Principal Project Manager
Profile Summary
Education: BS, Civil Engineering, Oregon State University Credentials: Civil Engineer, California No. 33142
Traffic Engineer, California No. 1695
Experience: 39 Years
Mr. Farhad Iranitalab possesses expertise in managing and directing projects involving geometric design; traffic signal design and operation; traffic impact and traffic flow/ capacity analyses; signing and striping design; and street light design. His experience encompasses projects from initial planning through construction. He has served as City Traffic Engineer for the Cities of Fairfield, San Jose, and Hayward; and has served or currently serves as contract City Traffic Engineer for the Cities of Brea, Pico Rivera, Los Alamitos, Norwalk, La Cañada Flintridge, and Elk Grove. His ability to assemble and work closely with the right project team empowers him to cost effectively manage complex projects.

Relevant Project Experience
Contract City Engineer and Traffic Engineer, City of Los Alamitos, California. Contract City Traffic Engineer responsible for providing contract extension of staff services in support of the City' s traffic engineering needs. Day to day tasks encompass all general traffic engineering concerns, such as reviewing traffic impact studies and traffic signal and striping plans, performing stop sign and safety analyses, evaluating traffic signal timing and operation, preparing and presenting Commission and Council reports, collaborating with neighborhood groups to develop traffic calming plans/ programs, conducting field investigations, and investigating citizens’ requests.

Katella Avenue Traffic Signal Synchronization, City of Los Alamitos, California. Project Manager responsible for overall project management and oversight of services required to coordinate the Measure M improvements. The project entailed 73 traffic signal modifications and traffic infrastructure updates along Katella Avenue from Inter state 605in Los Alamitos to Jamboree Road in the City of Orange. Willdan served as the Los Alamitos liaison with other agencies to move the project forward. Willdan secured funding for the City to replace the twisted copper communication cable with fiber optics, fund a traffic management center for the City of Los Alamitos, and upgrade traffic controller for future expansions.

City Traffic Engineering Services, City of La Cañada Flintridge, California. Contract City Traffic Engineer responsible for providing contract extension of staff services in support of the City' s traffic engineering needs. Day to day tasks encompass all general traffic engineering concerns, such as reviewing traffic impact studies and traffic control plans, collaborating with developers and their design teams, reviewing encroachment, approving transportation permits, preparing and reviewing traffic signal and striping plans, performing stop sign and safety analyses, preparing and presenting Commission and Council reports, collaborating with neighborhood groups to develop traffic calming plans/ programs, conducting field investigations, and investigating citizen requests.

City Traffic Engineering Services, City of Pico Rivera, California. Contract City Traffic Engineer responsible for providing contract extension of staff services in support of the City' s traffic engineering needs. Day to day tasks encompass all general traffic engineering concerns, such as reviewing traffic impact studies and traffic signal and striping plans, reviewing traffic control plans, performing stop sign warrants and safety analyses, preparing traffic calming studies, evaluating traffic signal timing and operations, preparing and presenting Commission and Council reports, conducting field investigations, and investigating citizens’ requests.

Traffic Engineering Services, City of Brea, California. Contract City Traffic Engineer responsible for providing contract extension of staff services in support of the City' s traffic engineering needs. Day to day tasks encompass general traffic engineering concerns, such as checking plans and project details regarding onsite circulation and design, project access, parking, and off site impacts; determining if traffic impact studies are required and providing required study elements to the City/ developer; reviewing and commenting on traffic studies; meeting with developers and developers' civil and traffic engineer; approving final traffic studies; analyzing collision reports and recommending safety measures, and preparing conditions of development.

El Roblar Drive Traffic Management Study, County of Ventura, California. Project Manager responsible for overall project management and oversight of all services required to prepare the traffic management study along El Roblar Drive. Willdan evaluated and developed short term and medium term alternatives to improve the safety and traffic flow between Rice Road and Lomita Avenue and the surrounding neighborhood streets. The goal of the traffic management plan was to improve safety and reduce traffic impacts along this urban residential collector road and determine if there was any cut through traffic or parking encroachment onto surrounding residential streets. The study also evaluated and addressed the safety for pedestrians and bicyclists by improving the signing and pavement markings.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 279 of 469 ends

Tyrone Peter, PE
Project Role: Civil Engineering
Job Classification: Director
Profile Summary
Education: BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering Civil Engineering, Murugappa Polytechnic
Credentials: Civil Engineer, California, No. 81888
Experience: 15 Years
Mr. Tyrone Peter is an accomplished civil engineer for multi discipline and multi agency infrastructure projects and is known for providing innovative, quality engineering services to ensure project delivery within budget and schedule. His 15 years of experience managing and designing all types of public works projects provide a solid foundation to understand what is needed to deliver a successful project and make him the perfect fit for overseeing the entire project as well as specific civil engineering tasks. Mr. Peter' s comprehensive experience includes design of state highway, new street, street widening, street realignment, pavement rehabilitation, light rail and railroad, grade separation, flood control facility, water, and sewer projects. He has supervised feasibility study, project study report, project report, construction document preparation as well as grade certification issuance, construction administration, and construction inspection. He is proficient at managing large project teams with subconsultants and multiple technical disciplines.

Relevant Project Experience
Priority 1 Street Improvements Phases 1, 2, and 3, City of Lynwood, CA. Project Manager responsible for overall project management and oversight required for the street improvement program. The project includes multiple phases for resurfacing selected local streets throughout the City. Various pavement strategies such as slurry seal, grind and overlay, and total reconstruction were incorporated into the street rehabilitations. Existing water and sanitary sewer mains and services were upsized. Willdan provided engineering design, utility coordination, advertising and bid support, and design support during construction.

Citywide Pavement Rehabilitation, City of Pico Rivera, CA. Project Manager. Willdan is providing engineering design services, including preliminary engineering, surveying, and preparation of plans, specifications and estimates for assessment of the existing pavement conditions of identified streets, and provide recommendations for the Citywide Street Rehabilitation Project Overlay and Reconstruction. Improvements for the project include pavement rehabilitation on various roadways segments; parkway improvements, such as reconstruction of existing damaged and uplifted concrete sidewalk, curb and gutter, and drive approaches.

The driveways within the project will be repaired where drainage and ADA issues exist. Curb ramps are to be installed or reconstructed to ensure compliance with ADA requirements, as well as design survey and utility adjustments, pavement assessments, signing and striping, and replacement of traffic loops.

US 101/ Lindero Canyon Road Interchange and Roadway Widening, City of Westlake Village, CA. Project Manager. Project Manager responsible for overall project management and oversight required to widen the roadway and bridge between Via Colinas and Agoura Road from two lanes to three lanes in each direction. Portions of curb and gutter and raised median along Lindero Canyon Road were removed and reconstructed to accommodate the widening. The north and south bound on and off ramps were modified to incorporate the widened roadway section.

Annual Pavement Preservation Project, City of Yorba Linda, CA. Project Manager. Willdan provided engineering design services to prepare plans, specifications, and estimates for assessment of the existing pavement conditions of identified streets and provide recommendations for the City' s Annual Pavement Preservation Program, Zone 1, for Year 2017/ 2018. The project limits for Zone 1 is located west of Valley View Avenue and north of Yorba Linda Boulevard. This zone encompasses approximately 68 lane miles of pavement that includes arterial, collector, and local streets. The scope of the project is preventive maintenance and increase the average life of the streets by five to seven years. Cost saving current strategies such as recycled asphalt pavement slurry, CAPE seal, applying reinforcing layers to wheel paths, using interlayers for crack mitigation, or adding high tensile fibers to the asphalt mixture was considered to identify the most cost effective maintenance or repair strategy for each street.

Lakewood Boulevard/ Del Amo Boulevard Hot Spot Box Culvert Extension and Street Widening, City of Lakewood, CA. Project Manager. Project Manager responsible for overall project management and oversight of all services required for the culvert extension and intersection improvements. The improvements encompassed widening the west side of Lakewood Boulevard south of Del Amo Boulevard requiring an extension of the existing 12 foot by 9 foot triple box culvert 35 feet on either side, a realignment of the channel 100 feet on the upstream side, and a modification of the existing storm drain connections. Willdan prepared CEQA documentation, obtained a County of Los Angeles construction permit and license agreement, and prepared a LID report as required DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 280 of 469 ends

Christopher D. Baca, RCI
Project Role: Construction Management/ Inspection
Job Classification: Director
Profile Summary
Education: BS, Public Administration, California State University, Fullerton Credentials: Registered Construction Inspector, Division IV, Public Works, California No. 4161 Registered Construction Inspector, Division I, Engineering, California No. 5161 Experience: 38 Years
Mr. Christopher D. Baca is responsible for directing and monitoring public works inspection services, and overseeing construction inspection personnel. His experience includes construction management of capital improvement projects in areas of water systems, street improvements, park improvements, storm drains, sanitary sewers, asphalt resurfacing including asphalt rubber products), concrete paving, landscaped medians, and traffic signals. Mr. Baca is familiar with the inspection and contract administration of other federally funded projects in accordance with Caltrans Local Assistance Procedures Manual.

Prior to joining Willdan, Mr. Baca worked for a soils engineering firm conducting field inspections and performing laboratory testing.

Relevant Project Experience
Street Improvements FY 19 20 Construction Management, City of La Puente, California. Provide construction observation, project management, material testing and labor compliance services for the street improvements on Various Streets Project FY 2019 20.

New Potable Water, Patton Road, City of Downey, California. The project involves the installation of new potable water ductile iron pipe, gate valves, tees, bends, thrust blocks and appurtenant fittings; installation of new fire hydrant assemblies, water service lines, meters, and boxes; and other appurtenant work.

Right of Way Improvements at Elliott Avenue and Amar Road, City of La Puente, California. Provide construction observation, project management, and labor compliance services for the right of way improvements at Elliott Avenue and Amar Road Project.

Lakewood and Del Amo Intersections Improvements, City of Lakewood, California. Provide project management, contract administration, construction observation, engineering support, utility coordination, labor compliance, material testing, and Metro invoicing reporting services for the Del Amo and Lakewood Intersection Improvements Project.

Ian Calderon Skate Park, City of La Puente, California. Provide construction observation, project management, material testing and labor compliance services for Ian C. Calderon Skatepark and Basketball Court Construction Project.

Sewer and Park Improvements at La Puente Park, City of La Puente, California. Provide construction observation, project management, material testing and labor compliance services for the sewer and park improvements at La Puente Community Park Project.

Westside Water and Sewer Main Replacement Program Phase 1 City of South Gate California. Project Manager. Willdan provided construction management and public works observation services for the City’ s water and sewer main replacement project. The project included replacement of 1.000 LF of 12” DIP, 17,600 LF of 8” DIP, and 950 LF of 6” DIP water mains and 450 LF of 12” VCP and 1,700 LF of 10” VCP sewer mains. Existing water mains were abandoned in place while the existing sewer mains were removed from the trench and new mains installed in the same alignment. Total construction cost is approximately 4.5 million.

Firestone at Paramount Intersection Improvements, City of Downey, California. Willdan provided construction management and inspection services for this 1.6 million construction project. The project included street widening at the intersection of Firestone Blvd and Paramount Blvd, the 2nd highest volume intersection within the City of Downey. The general nature of the work included raised medians, new curb, gutter, and sidewalk, driveway approaches, traffic signal replacement, landscaping and irrigation, ARHM paving, utility adjustments, and striping.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 281 of 469 ends

Jeffrey Lau, PE, TE, ENV SP
Project Role: Traffic Engineering
Job Classification: Deputy Director
Profile Summary
Education: BS, Civil Engineering, California Polytechnic State University Pomona Credentials: Civil Engineer, California No. 83887
Traffic Engineer, California No. 2835
Envision Sustainability Professional No. 45376
Experience: 18 Years
Mr. Jeffrey Lau offers 18 years of traffic design and transportation planning experience. Mr. Lau provides transportation design for Willdan' s traffic engineering group and manages design projects for a variety of cities and counties throughout California. He is responsible for analysis, coordination, and design of various projects, including preparation of plans, specifications and estimate PS& E) for traffic design projects such as traffic signals, signing and striping, street lighting, and construction traffic control. He has also assisted with traffic impact studies and analyses, plan reviews, and engineering and traffic survey updates. Mr. Lau is an accomplished engineer for multi discipline and multi agency traffic and transportation projects and has supervised completion of a variety of large to small scale projects. Mr. Lau has personally designed over 200 new and modified traffic signal installations for cities and other agencies throughout California. He understands the importance of meeting schedules and developing the most cost efficient project to meet budgetary constraints.

Relevant Project Experience
On Call Traffic Engineering Services, City of Paramount, California. Project Manager. Responsible for providing professional traffic engineering services to the City of Paramount on a routine basis. Duties included field reconnaissance and data collection; resident request investigations and work order preparation; traffic signal, signal interconnect, signing and striping, and traffic control plan reviews; funding documents preparation to request reimbursement of federally funded projects; and traffic and civil improvement conceptual design plans and council exhibit preparation.

On Call Traffic Engineering Services, City of Pico Rivera, CA. Project Manager. Willdan is serving as City Traffic Engineer for the City of Pico Rivera and provides on call traffic engineering services. Typical duties include design oversight, response to residents’ and businesses’ requests, review of traffic and parking impact studies, review of development projects, development of conditions of approval”, review of traffic signal and traffic control plans, preparation of work orders, operational analysis, development of City’ s Neighborhood Traffic Calming program, attendance at City Council and Planning Commission meetings as requested.

City Traffic Engineer/ On Call Traffic Engineering, City of Inglewood, California. Task Manager/ Project Traffic Engineer responsible for traffic studies and design services through our staff augmentation City Traffic Engineer contract. Willdan staff review and make recommendations on residents' requests for stop signs, crosswalks, permit parking, and speed humps; review plans, specifications, and estimates for various projects; prepare staff reports; attend Parking and Traffic Commission meetings; prepare traffic signal and signing and striping plans, specifications, and estimates; prepare timing charts for citywide signal coordination timing and individual traffic signals; prepare studies for CMP, warrant analyses, traffic calming measures, and other areas of concern.

On Call Traffic Engineering Services FY 2016 2017, City of Rancho Palos Verdes, CA. Plan Check Engineer. Willdan provides city traffic engineering services to the City of Rancho Palos Verdes. Duties include preparing traffic studies and reports, investigating citizens' requests, reviewing traffic impacts of developments, plan check traffic control for permit process, preparing staff reports and attending Traffic Commission meetings and working with Public Works staff in implementing traffic related projects. Willdan prepared a variety of traffic studies for the City, such as stop signs, traffic signals, school circulation, school pedestrian safety, crosswalks/ enhanced crosswalks, Engineering Traffic Surveys to set speed limits, permit parking, sight distance, and safety improvements at intersections and on roadway segments.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 282 of 469 ends

Chien Chang Chen, Ph.D., PE, GE
Project Role: Geotechnical Services
Job Classification: Supervising Engineer
Profile Summary
Education: PhD, Geotechnical Engineering, Georgia Institute of Technology MS, Geotechnical Engineering, Georgia Institute of Technology BS, Civil Engineering, National Chiao Tung University, Taiwan Credentials: Geotechnical Engineer, California, No. 3183 Professional Engineer in Civil Engineer, California No. C63238 Experience: 24 Years
Mr. Chien Chang Chen has over 24 years of experience in geotechnical and earthquake engineering. He specializes in developing foundation recommendations for the design and construction of pipelines, transportation, power supplies, residential development, schools, and commercial structures including the mitigation of soft ground and liquefaction by ground improvement. Chien Chang offers leadership in the provision of geotechnical interpretation, analysis, the development of geotechnical solutions and design production including project management and business development. Chien Chang has worked on a wide variety of engineering projects in USA, New Zealand and Taiwan.

Relevant Project Experience
City Trunk Line South Unit 6 CTLS 6), Studio City, California, Los Angeles Department of Water and Power LADWP). Project Engineer. Performed geotechnical field investigation and prepared geotechnical baseline reports for the CTLS 6 project. The project involved relining the existing 51 inch inner diameter, riveted steel pipe with a carbon fiber reinforced polymer CFRP) lining, removal of the flow meter, and relocation of the flow control station using cut and cover method. Our field investigation task involved drilling and sampling of 5 borings to 50 feet bgs along the pipeline alignment, laboratory testing on soil samples, preparation of geotechnical baseline reports, review of design drawings and specifications, and scheduling.

Century Trunk Line Unit 1 CTL 1), Inglewood, California, Los Angeles Department of Water and Power LADWP). Project Engineer.

Performed technical review of shoring system designed by the Contractor and construction inspection for the CTL 1 project. The project involved involve installation of approximately 9,700 lineal feet of 48 inch diameter, earthquake resistant ductile iron pipe using both cut and cover and tunneling methods.

Paseo Del Mar White Point) Permanent Restoration Project, Los Angeles Geotechnical Engineering Division LAGED). Lead Geotechnical Engineer. Led and performed a geotechnical detailed design for a single span bridge 380 feet long) and associated site civil work for the Paseo Del Mar White Point) Permanent Restoration Project in San Pedro, California, following the 2011 White Point landslide. Detailed design involved in interpretation of design parameters for soils and rock, seismic assessment to determine design peak ground acceleration and liquefaction potential, foundation design and ground improvement for the proposed bridge, mitigation of the existing slopes by deep soil mixing and ground anchors and the reinforced soil slopes located in approach fill.

State Route 91 Widening Project, Caltrans, Yorba Linda, California. Project Engineer. The project was proposed to add one additional lane on westbound Route 91 between Orange/ Riverside County line and Coal Canyon Rd. The total distance of the proposed project was about 2 miles including the construction of new roadway embankment and retaining wall up to 4 meters in height and existing bridge widening. He supervised the field investigation and performed engineering analysis including seismic analysis, liquefaction potential, retaining wall/ roadway embankment analysis and design, bearing capacity and settlement analysis for shallow foundations and pile design for bridge widening.

Pacific Coastal Highway Roadway Distress Investigation, Caltrans, Crystal Cove, California. Project Engineer. Pavement cracking/ vertical offset and fill embankment settlement was observed in an enclosing area of 70 m long and 12 m wide. The width of cracking was on the order of inches. Chien Chang planned and supervised forensic investigation including boring holes, CPT soundings, and installation of slope inclinometers, settlement marks and observation wells. He also performed engineering analysis including slope stability analysis to evaluate the potential for embankment slope failure. Remedial recommendations were provided to prevent further distress and ensure roadway embankment safety.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 283 of 469 ends

David Wooley, PLS
Project Role: Survey
Job Classification: Principal Project Manager
Profile Summary
Education: Survey and Mapping Courses Ethics, Business Professions Code, ALTA/ NSPS, Copyright Law, and Land Surveying Courses, Santiago Canyon College
Credentials: Land Surveyor, California No. 7304
Experience: 32 Years
Mr. David Woolley possesses a full complement of land surveying expertise. His background and knowledge encompasses standard of care, construction surveying, boundary line determinations and analyses, boundary disputes, deed interpretations, boundary reconstructions, easement analyses and construction, map preparation, construction, and constructability. Mr. Woolley offers a strong history interpreting the Professional Land Surveyor’ s Act and California Subdivision Map Act and ensuring prepared and reviewed documentation conforms to all codes and regulations under those acts along with any local or regional requirements.

Mr. Woolley was the former supervisor of the Compliance Checking Section of the Orange County Surveyor' s office. He was responsible for compliance with state laws, local ordinances and boundary determination. In addition to preparing records of survey, he reviewed over 1,000 tract maps, 500 parcel maps, and 300 records of survey prepared by private land surveyors. Mr. Woolley served as the Interim City Surveyor for the City of Long Beach. There, he was responsible for all land surveying functions required of the department. to prepare or review right of way documents such as vacations, dedications, and acquisitions.

Relevant Project Experience
On Call Services for City Surveyor, Traffic Engineering, Environmental Review, and Labor Compliance, City of El Monte, California.

Contract City Surveyor and Survey/ Mapping Reviewer responsible for performing reviews for improvements throughout the city.

Willdan provides engineering on call plan check services for off site improvement of various developments throughout the city. Plan checks encompass first, second, and third reviews as necessary for street, traffic, sewer, storm drain, geotechnical reports, SWPPPs, and map checks.

Survey and Mapping Services, City of Inglewood, California. Survey/ Mapping Reviewer responsible for performing reviews for public improvements throughout the city. Through the on call services contract, Willdan provides technical reviews of parcel maps, tract maps, lot line adjustment, certificates of compliance, and lot mergers.

On Call Survey Services, City of Lakewood, California. Survey/ Mapping Reviewer responsible for performing reviews for public improvements throughout the city. Willdan provides technical checking services for lot line adjustments and easement dedications and has performed topographic surveys, prepared base maps for use in designs, and performed right of way engineering for citywide improvement projects.

Contract City Surveyor and On Call Improvement Plan Check, City of Rialto, California. Contract City Surveyor and Survey/ Mapping Reviewer responsible for performing reviews for improvements throughout the city. Willdan provides plan checking services for all improvement plans, including residential subdivisions; private developments; and street, traffic, and grading improvements; all map reviews; and all technical design reports associated with the improvement plans, including hydrology, utilities, SWPPP, WQMP, and sediment control plans.

On Call Land Development Review, City of Santa Paula, California. Survey/ Mapping Reviewer responsible for performing third party review for development throughout the city. Willdan provides reviews for land development projects encompassing civil infrastructure, grading, soils, traffic, floodplain management, environmental studies, and permit application requests. Maps are reviewed for conformance with the California Subdivision Map Act.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 284 of 469 ends

John Hidalgo, RLA
Project Role: Landscape Architecture
Job Classification: Principal Project Manager
Profile Summary
Education: BS, Landscape Architecture, California State Polytechnic University, Pomona European Study Tour, California Polytechnic State University, School of Architecture, Pomona Credentials: Landscape Architect, California No. 3551
Licensed Contractor, California C 27 No. 713613
Experience: 29 Years
Mr. John Hidalgo possesses landscape architecture experience that encompasses a variety of landscape and irrigation projects. He has in depth expertise in design development, preparation of plans and specifications, plan reviews, and construction observation.

Mr. Hidalgo is familiar with various local, state, and federal codes, regulations, procedures, and standards relating to construction, safety, park and facility planning, and other landscape and irrigation amenities. He has successfully completed projects in compliance with these various standards. Mr. Hidalgo has experience representing project owners during the plan review process. He possesses comprehensive experience in both field observation and construction. Mr. Hidalgo responsibilities include managing park and street beautification design, low impact developments, plan reviews, and construction observation.

Relevant Project Experience
Urban Greening Bicycle Trail, City of Lynwood, California. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required to develop a sustainable, integrated, and efficient design for a bicycle trail within the community consistent with the City' s year round recreational programs. The 2.85 million, 1.2 mile project improvements are being designed to meet the City' s general plan objectives and incorporate landscaping and decorative/ commemorative points of interest along the trail. The ultimate bicycle path will provide safe connectivity between parks, bus and light rail transit stops, city hall, and other City attractions and shopping areas. Willdan is providing full engineering design services encompassing field survey, right of way engineering, geotechnical engineering and inspection, landscape architecture, environmental documentation, preliminary and final design, drainage and water quality, utility coordination, traffic design, and safety and visibility lighting design.

Long Valley Road/ Valley Circle Boulevard/ U.S. 101 On Ramp Improvements. City of Hidden Hills, California. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required to improve traffic congestion and pedestrian access at the Long Valley Road on ramp intersection. The improvements encompass sidewalks, right turn out lane, paved public parking lot and staging area for City entry, on ramp sidewalk, shoulder paving, and other improvements at the heavily congested intersection of Long Valley Road and U.S. 101 on ramp. Willdan is providing civil, drainage, landscape architectural, and traffic design; environmental compliance documentation; survey; geotechnical engineering and materials testing; grant funding administration; utility coordination; NPDES, SWPPP, and erosion control; right of way engineering; and construction support for this Measure R improvement project.

Firestone Boulevard Capacity Enhancement, City of South Gate, California. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required for the corridor improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA compliant ramps; parkway trees; artistic elements and corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services provided included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and right of way engineering; and utility relocation.

Firestone Boulevard/ Atlantic Avenue Intersection Improvements, City of South Gate, California. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required for improvements between Firestone Boulevard limit and south city limit. The improvements involved asphalt rubber hot mix overlay, street widening, street trees, raised landscaped medians, irrigation system, ADA compliant curb ramps, concrete repairs, traffic signal modifications, communication conduits, and signing and striping. Willdan assisted the City through the planning process by developing a concept plan and presenting it to city council and affected business owners and residents. Willdan provided civil and traffic engineering design, pavement engineering, design survey, landscape architectural design, public outreach, and utility coordination.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 285 of 469 ends

Joe Bellomo, PE, QSD/ P
Project Role: Storm Water/ NPDES
Job Classification: Principal Project Manager
Profile Summary
Education: BS, Civil Engineering, California State University, Los Angeles Credentials: Civil Engineer, California No. 75564
Qualified SWPPP Developer QSD) and Qualified SWPPP Practitioner QSP) No. 20016 Experience: 24 Years
Mr. Joseph Bellomo joined Willdan as a Civil Engineer to work on various aspects of storm water and city engineering. Since his start with the firm, Mr. Bellomo has used his experience and knowledge of the State and Federal National Pollutant Discharge Elimination Systems NPDES) program to manage compliance for many of Willdan’ s clients. The majority of Willdan’ s NPDES related clients rely on Mr. Bellomo for full NPDES permit and Total Maximum Daily Load TMDL) program management services, formally or otherwise.

This typically includes the preparation of fiscal year budgets, report, and presentations to city staff and city council, preparation of annual reports and presentations to regulators; development and management of service contracts, multiagency agreements, and compliance programs; coordination with watershed partners, regulators and non governmental organizations; and at times managing city service personnel. As a result, Willdan has a comprehensive understanding of NPDES Permit requirements and the best approach to implementation. Mr. Bellomo is assisted by a team of two solely dedicated to providing NPDES compliance services to Willdan clientele.

Relevant Project Experience
NPDES/ EWMP Consulting Services, City of San Fernando, CA. NPDES Compliance Manager. Mr. Bellomo has provided the City with Upper Los Angeles River EWMP Group representation and general NPDES Permit compliance consultation since 2013. This includes compliance with the MS4 Permit and TMDL technical guidance, Trash TMDL compliance and catch basin retrofits, annual report preparation, staff training, and general implementation of MS4 Permit minimum control measures. Joe assists the Water Department comply with the Low Threat Discharge permit issued for the reactivation of Well 7A, and other matters relating to regulatory requirements.

NPDES/ Water Quality Consultant Services, City of Hidden Hills, CA. Mr. Bellomo has served as the Storm Water Program Manager since 2013. Mr. Bellomo is responsible for full compliance with the Municipal NPDES Permit, TMDLs in the Los Angeles River Watershed and Malibu Creek Watershed, as well as other NPDES regulations. On the City’ s behalf, he serves as the City’ s representative to the North Santa Monica Bay Watershed Area Steering Committee for the regional management of the Measure W Safe Clean Water Program. Mr. Bellomo has ensured compliance with the municipal NPDES permit, and developer compliance with the State’ s construction general permit, including SWPPP and USMP reviews, and LID plan reviews. Mr. Bellomo reports directly to the City Manager and answers to the City County on all NPDES permit and TMDL management and implementation of related programs, special monitoring studies, and annual reporting.

NPDES Services, City of Bell, CA. NPDES Compliance Manager. Mr. Bellomo is responsible for assisting with the City' s stormwater program relating to ensuring MS4 Permit compliance; serving as the City' s advocate at LAR UR2 watershed, funding, and permit group meetings; reviewing and providing guidance on key technical documents and regulations; administering commercial and industrial facility inspections; and completing the required annual reporting.

NPDES Consulting Services, City of Cudahy, CA. Mr. Bellomo performs most of the permit functions and provides technical expertise; LAR UR2 WMP and other MS4 permit related meeting representation; staff training; commercial and industrial facility inspections; and annual reporting requirements. Joe assisted with the development of the Green Streets policy and the Low Impact Development Ordinance adopted by the City Council to manage development in the City.

Storm Water Program Management, City of Calabasas, California. Responsible for providing the Environmental Services Division with onsite staff support services. Duties included storm water pollution prevention plan SWPPP) and urban storm water mitigation plan USMP) reviews, municipal NPDES permit and TMDL requirements, staff reports, assisting at the public counter for storm water related issues, participation on the Development Review Committee to provide conditions for private development projects, and training and transitioning City staff into the Division as well as the current Environmental Services Manager.

Storm Water Engineering, Morongo Band of Mission Indians, Banning, California. Responsible for assisting in development of a nonpoint source NPS) pollution identification study for the Tribe. This study identified several NPS on the Reservation with the potential to impair water bodies within the watershed, and provided recommended control measures to reduce the risk of pollution.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 286 of 469 ends

Lani Alfonso, PE
Project Role: Grant Administration
Job Classification: Principal Project Manager
Profile Summary
Education: BS, Civil Engineering, University of Southern California, Los Angeles, California Credentials: Professional Civil Engineer, California Registration No. 56397 Experience: 30 Years
Ms. Lani Alfonso is a Willdan Engineering project manager with 30 years of experience in public works engineering and project management who combines excellent communication and management skills with analytical and technical qualifications.

Relevant Project Experience
Engineering Services FY 2020, City of Paramount, CA. Willdan provides city traffic engineering services to the City of Paramount.

Duties include preparing traffic studies and reports investigating citizens requests reviewing traffic impacts of developments plan checking traffic related projects preparing staff reports and attending Traffic Commission meetings and working with Public Works staff in implementing traffic related projects. Willdan prepares plans specification and estimate for traffic signal signing striping traffic control and street lighting.

Street Improvements FY 2019 2020, City of La Puente, CA. Willdan provided professional engineering services for the design and bidding of the 2019 20 FY Annual Resurfacing Project for the City of La Puente. Willdan prepared the plans, specifications, and estimates PS& E) for the design package and provided bidding assistance services for the project. The project included the following proposed improvements: Resurfacing with Asphalt Rubber Hot Mix ARHM) to prevent more serious and costly deterioration which could lead to complete reconstruction of existing pavement, reconstruction of damaged and uplifted concrete sidewalk, curb, gutter and driveway approaches, installation of new access curb ramps compliance with the Americans with Disabilities Act ADA) requirements as well as signing and striping.

Valley Boulevard Sewer Construction Management, City of La Puente, CA. Provide construction observation, project management and labor compliance services for the Valley Boulevard sanitary sewer improvement and pavement resurfacing project.

Local Road Safety Plan, City of Lakewood, CA. Willdan will prepare a Local Road Safety Plan LRSP) for the City. The LRSP looks at crash history on an aggregate basis to identify high risk roadway characteristics, rather than looking at high collision concentration locations through site analysis. This evaluation is expected to help identify safety projects within the City and prioritize countermeasures across a system. The results of the evaluation will identify safety projects within the City that can be used to apply for future funding consideration through the Highway Safety Improvement Program HSIP) and other safety program applications.

City Engineering Services, City of Westlake Village, CA. Willdan is providing city engineering services, project management, construction management and inspection services for capital improvement projects. Projects include the Sidewalk Improvement Project FY 2021 2022, CIP Park Improvement FY 2021 2022.

Fair Oaks Traffic Signal Project, City of South Pasadena, CA. The project includes the installation of fiber optic lines throughout Fair Oaks Avenue. Willdan provided construction management and inspection services for the Project.

Annual Street Improvement FY 2021 22, City of Fillmore, CA. Project includes street improvement, ADA improvements, and Mountain View sidewalk project.

DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 287 of 469 ends

Jane E. Freij
Project Role: Labor Compliance
Job Classification: Labor Compliance Manager
Profile Summary
Education: BA, Linguistics, University of Kansas
Experience: 22 Years
Ms. Jane E. Freij is an experienced Administrative/ Project Manager with a proven record of profitability achieved through comprehensive and effective management of time and budget. Key areas of expertise include project needs analyses, scheduling and budgeting, contract administration/ negotiation, legal documentation, policy and procedure development, and writing and editing. As a Supervising Labor Compliance Manager, Ms. Freij provides oversight of labor compliance monitoring services for various federally funded projects under FHWA, FTA, HUD, and EPA. She is familiar with the FHWA federal funding administration process from field review and request for authorization to final invoicing and has specialized training in the reporting requirements and fraud detection and prevention procedures for projects funded by the American Recovery and Reinvestment Act of 2009 ARRA).

Experience prior to joining Willdan includes 4 years with Edison Enterprises, where Ms. Freij served as Contract Administrator and Senior Contract Administrator. In these positions, she developed and negotiated contracts for products and services, monitored and enforced contractual compliance, constructed contractual terms and conditions, served as risk management liaison, and managed a multi state licensing project for an energy services subsidiary. Ms. Freij has a strong legal background, having served as a paralegal and senior paralegal for litigation attorneys in the areas of real estate, land development, and contract law. She is experienced in Microsoft Word, Microsoft Excel, and Lexis Nexis research software.

Relevant Project Experience
Sewer Improvements on Beck and Orchard Avenues, City of Bell, California. Provide project management, contract administration, construction observation, engineering support, utility coordination, labor compliance material testing for the sewer improvements on Beck and Orchard Avenues project. The project included replacing the existing 8 inch sewer with 10 inch VCP, pavement cold milling and ARHM overlay, sidewalk, cross gutters, ADA ramps, adjusting manhole frames and valves to grade, and striping.

Florence Avenue Pedestrian Project, City of Bell, California. Provide project management, contract administration, construction observation, utility coordination labor compliance for the Florence Avenue Pedestrian Improvement Project. The project included construction of median islands, entry monuments, built outs, decorative concrete sidewalks, bus shelter furnishings, and parkway trees.

Street Improvements FY 19 20 Construction Management, City of La Puente, California. Provide construction observation, project management, material testing and labor compliance services for the street improvements on Various Streets Project FY 2019 20.

Right of Way Improvements on Elliott Avenue and Amar Road, City of La Puente, California. Provide construction observation, project management, and labor compliance services for the right of way improvements at Elliott Avenue and Amar Road Project.

Lakewood and Del Amo Intersections Improvements, City of Lakewood, California. Provide project management, contract administration, construction observation, engineering support, utility coordination, labor compliance, material testing, and Metro invoicing reporting services for the Del Amo and Lakewood Intersection Improvements Project.

Ian Calderon Skate Park, City of La Puente, California. Provide construction observation, project management, material testing and labor compliance services for Ian C. Calderon Skatepark and Basketball Court Construction Project.

Sewer and Park Improvements at La Puente Community Park, City of La Puente, California. Provide construction observation, project management, material testing and labor compliance services for the sewer and park improvements at La Puente Community Park Project.

Curbs, Sidewalks, and Curb Ramps ADA Citywide, City of Pico Rivera, California. Labor compliance monitoring and enforcement of a citywide CDBG funded sidewalk and ADA curb ramp project. CIP No. 21364 DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 288 of 469 ends

Proposed Fee Schedule
A fee schedule is attached, it should be noted that some classifications have a reduced rate offered to the City.

Schedule of Hourly Rates
Effective July 1, 2022 to June 30, 2023
For Non- Prevailing Wage Project *** For Prevailing Wage Project Mileage/ Field Vehicle usage will be charged at the rate in accordance with the current FTR mileage reimbursement rate, subject to negotiation. Additional billing classifications may be added to the above listing during the year as new positions are created. Consultation in connection with litigation and court appearances will be quoted separately. The above schedule is for straight time. Overtime will be charged at 1.5 times, and Sundays and holidays, 2.0 times the standard rates. Blueprinting, reproduction, messenger services, and printing will be invoiced at cost plus fifteen percent ( 15%). A sub consultant management fee of fifteen percent ( 15%) will be added to the direct cost of all sub consultant services to provide for the cost of administration, consultation, and coordination. Valid July 1, 2022 thru June 30, 2023, thereafter, the rates may be raised once per year to the value between the 12-month % change of the Consumer Price Index for the Los Angeles/ Orange County/ Sacramento/ San Francisco/ San Jose area and five percent. For prevailing wage classifications, the increase will be per the prevailing wage increase set by the California Department of Industrial Relations. Rev 06. 09. 2022V03

DESIGN ENGINEERING
Technical Aide I $ 74
Technical Aide II $ 96
Technical Aide III $ 115
CAD Operator I $ 120
CAD Operator II $ 139
CAD Operator III $ 154
GIS Analyst I $ 160
GIS Analyst II $ 175
GIS Analyst III $ 185
Environmental Analyst I $ 133
Environmental Analyst II $ 149
Environmental Analyst III $ 159
Environmental Specialist $ 171
Designer I $ 160
Designer II $ 166
Senior Designer I $ 175
Senior Designer II $ 184
Design Manager $ 185
Senior Design Manager $ 188
Project Manager I $ 169
Project Manager II $ 187
Project Manager III $ 197
Project Manager IV $ 212
Principal Project Manager $ 216
Program Manager I $ 187
Program Manager II $ 199
Program Manager III $ 217
Assistant Engineer I $ 133
Assistant Engineer II $ 148
Assistant Engineer III $ 157
Assistant Engineer IV $ 165
Associate Engineer I $ 170
Associate Engineer II $ 177
Associate Engineer III $ 181
Senior Engineer I $ 184
Senior Engineer II $ 188
Senior Engineer III $ 191
Senior Engineer IV $ 195
Supervising Engineer $ 199
Traffic Engineer I $ 199
Traffic Engineer II $ 212
City Engineer I $ 212
City Engineer II $ 220
Deputy Director $ 220
Director $ 226
Principal Engineer $ 245

BUILDING AND SAFETY
Assistant Code Enforcement Officer $ 98
Code Enforcement Officer $ 112
Senior Code Enforcement Officer $ 132
Supervisor Code Enforcement $ 160
Plans Examiner Aide $ 105
Plans Examiner $ 160
Senior Plans Examiner $ 175
Assistant Construction Permit Specialist $ 112
Construction Permit Specialist $ 118
Senior Construction Permit Specialist *** $ 139
Supervising Construction Permit
Specialist $ 147
Assistant Building Inspector $ 132
Building Inspector*** $ 147
Senior Building Inspector $ 160
Supervising Building Inspector $ 175
Inspector of Record $ 187
Deputy Building Official $ 187
Building Official $ 189
Plan Check Engineer $ 183
Supervising Plan Check Engineer $ 185
Principal Project Manager $ 216
Deputy Director $ 220
Director $ 226

PLANNING
CDBG Technician $ 78
CDBG Specialists $ 93
CDBG Analyst $ 110
CDBG Coordinator $ 138
CDBG Manager $ 166
Planning Technician $ 118
Assistant Planner $ 147
Associate Planner $ 160
Senior Planner $ 182
Principal Planner $ 189
Planning Manager $ 201
Deputy Director $ 220
Director $ 226

ADMINISTRATIVE
Administrative Assistant I $ 90
Administrative Assistant II $ 109
Administrative Assistant III $ 127
Project Accountant I $ 102
Project Accountant II $ 119
Project Controller I $ 127

CONSTRUCTION MANAGEMENT
Labor Compliance Specialist $ 132
Labor Compliance Manager $ 166
Utility Coordinator $ 167
Office Engineer I $ 133
Office Engineer II $ 148
Assistant Construction Manager $ 145
Construction Manager $ 168
Senior Construction Manager $ 182
Resident Engineer I $ 189
Resident Engineer II $ 196
Project Manager IV $ 212
Deputy Director $ 220
Director $ 226

INSPECTION SERVICES
Public Works Observer ** $ 113
Public Works Observer *** $ 138
Senior Public Works Observer** $ 124
Senior Public Works Observer *** $ 138

MAPPING AND EXPERT SERVICES
Survey Analyst I $ 139
Survey Analyst II $ 160
Senior Survey Analyst $ 182
Supervisor - Survey & Mapping $ 191
Principal Project Manager $ 216

LANDSCAPE ARCHITECTURE
Assistant Landscape Architect $ 139
Associate Landscape Architect $ 160
Senior Landscape Architect $ 175
Principal Landscape Architect $ 185
Principal Project Manager $ 216
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 289 of 469 ends

13191 Crossroads Parkway North, Suite 405
Industry, CA 91746- 3443
562.908.6200 | 800.499.4484 | Fax: 562.695.2120
www.willdan. com
DocuSign Envelope ID: 04C5D855- 7EDC- 477D-8475-A9E9D8919044

Page 290 of 469 ends

City of Los Alamitos

CITY COUNCIL AGENDA REPORT
MEETING DATE: May 26, 2026 ITEM NUMBER: 11I
To: Mayor Tanya Doby & Members of the City Council
Presented By: Ron Noda, Assistant City Manager/Development Services Director Britney Ramirez, Senior Management Analyst
Subject: Amendment No. 2 to Professional Services Agreement (PSA) with SDI Presence LLC for IT Services

SUMMARY
The existing Professional Services Agreement (PSA) with SDI Presence LLC for Information Technology (IT) Staffing and Management Services expires on June 30, 2026. This item requests City Council approval of Amendment No. 2 to extend the term of the agreement for an additional one (1) year through June 30, 2027, while the scope of services and compensation remains unchanged.

RECOMMENDATION
Authorize the Mayor to execute Amendment No. 2 to the Professional Services Agreement (PSA) with SDI Presence LLC to extend the term of the agreement through June 30, 2027, and at City's sole discretion, to optionally extend another year to June 30, 2028 if in the best interest of the City.

BACKGROUND
In 2024, the City conducted an informal request for proposals for Information Technology staffing and management services. Following the review process, the City entered into a Professional Services Agreement with SDI Presence LLC to provide Information Technology staffing and management services in support of the City’s ongoing technology operations and initiatives. Services provided under the agreement include technical staffing support, information technology management assistance, and related professional IT services that supplement City staff resources.

The existing Professional Services Agreement expires on June 30, 2026. The agreement currently provides for services in an amount not-to-exceed $8,245.25 per month. The proposed Amendment No. 2 would extend the agreement term through June 30, 2027, while maintaining the existing scope of services.

DISCUSSION
SDI continues to provide Information Technology staffing and management services that support the City’s day-to-day technology operations and ongoing IT initiatives. The

Page 291 of 469 ends

continuation of these services will assist the City in maintaining operational continuity and ensuring continued support for critical technology systems and services.

The proposed Amendment No. 2 would extend the agreement term for an additional one (1) year through June 30, 2027, while maintaining the existing scope of services and current compensation. The amendment also provides that the City may exercise, at its sole discretion, an option to extend the Agreement for one (1) additional one (1)-year term to June 30, 2028.

Staff recommends approval of Amendment No. 2 to ensure continuity of Information Technology staffing and management services.

FISCAL IMPACT
Funding for the agreement is included in the Information Technology budget for Fiscal Year 2026-27 and will be appropriated through the annual budget process. Approval of Amendment No. 2 will not require additional budget appropriations at this time.

Attachment: 1. Amendment No. 2 - SDI Presence, LLC

2. Amendment No. 1 - SDI Presence, LLC

3. SDI Presence, LLC. - Professional Services Agreement (2024)

Page 292 of 469 ends