2. Give direction to City staff on Council’s preference for traffic signals or roundabouts on Reservation Road.

BACKGROUND:

Reservation Road is one of Marina’s most heavily used arterial streets and plays a crucial role in the City’s future downtown revitalization plans. On October 15, 2024, the City Council adopted the 2024 Downtown Vitalization Specific Plan, which proposed improved traffic signals at key intersections along Reservation Road to facilitate increased future traffic flow and to support the new downtown environment. Recently, Kimley-Horn conducted a feasibility study exploring the potential of implementing roundab outs at these intersections as an alternative to traffic signals, with the goal of enhancing traffic movement, beautification, and long-term sustainability.

ANALYSIS:

The Kimley -Horn study indicates that replacing traffic signals with roundabouts is not only feasible but also offers several benefits including improved traffic flow, reduced long -term maintenance costs, and aesthetic enhancements that align with the downtown revitalization vision.

The study compares various configurations of roundabouts and concludes that certain options outperform traditional signals in efficiency and community impact. Kimley -Horn’s team is prepared to present detailed findings and visualizations through a PowerPoint presentation, and will be available to answer questions from the Council and the public.

FISCAL IMPACT:

The study and presentation primarily involve analytical assessment and public engagement activities. Implementation costs for roundabouts versus traffic signals are expected to be considered during future project planning and budgeting processes. The poten tial for long -term savings in maintenance and operational costs associated with roundabouts could result in fiscal benefits over time. The City will need to evaluate funding sources and budget implications should the Council decide to pursue the construction of roundabouts. 1 Respectfully submitted,

_____________________________
Ismael Hernandez
Public Works Director
City of Marina

Layne Long
City Manager
City of Marina

2 Reservation Road
Corridor Study
May 2025

Downtown Vitalization Specific Plan
•Goal M-1:
• Mobility - A downtown with safe and efficient pedestrian and vehicular circulation that encourages people to gather, walk, cycle, or use public transportation.
•Policy M-1.17
• Support the implementation of roundabouts and lane
reductions on Del Monte Boulevard. Similarly, continue to evaluate the
feasibility of lane reductions on Reservation
Road to calm the flow of traffic and further the City’s goal of creating more inviting streetscapes.
2 Reservation Corridor Study Objectives
Determine an optimal Reservation Road streetscape design to achieve the vision and goals of downtown Marina

1. Test the feasibility of roundabouts along the corridor

2. Enhance access and safety for all users

3. Create a thriving downtown environment consistent with the Downtown Specific Plan

4. Maintain acceptable traffic operations
Corridor Study Overview

1. Corridor Alternatives (Signal vs Roundabout)

2. Corridor Analysis Results

3. Recommendations
Downtown
Marina
Del Monte Blvd Future
Roundabouts at Marina
Station Development
Del Monte Blvd
Future Roundabouts
& Landscape Medians
Test Roundabout Feasibility
Along Reservation Rd
Existing Roundabouts
Project Study Area
Existing RoundaboutsExisting Roundabouts

Downtown
Marina
Project Study Area
Future Roundabout
Corridors

1. Corridor Alternatives

1. History of Del Monte/Reservation & Reservation Rd Corridor

2. Signal Control (Analysis from 2019 Downtown SP Study) • 4 Lane Road
• 2 Lane Road

3. Roundabout Control (Current Study)
• 2+ Lane Road
• 4 Lane Road
• 2 Lane Road (Interim Solution)
7 Corridor Alternatives
Signal Control – Option 1
Roundabout Control – Option 2
8 Reservation
California
Del Monte
Crescent
De Forest
Marina Square
Seacrest
Vista Del Camino
Signal Corridor (4-Lane Existing)
Del Monte to Vista Del Camino
106-ft Cross-Section
90-ft Curb-to-curb
9 Reservation
California
Del Monte Posted Speed: 35-mph
85th % Speed: 39-mph
Signal Corridor (4-Lane Existing)
Vista Del Camino to Crescent
113-ft Cross-Section
95-ft Curb-to-curb
10 California
Del Monte Posted Speed: 35-mph
85th % Speed: 39-mph
Reservation
Signal Corridor (4-Lane Existing)
Crescent to California
110-ft Cross-Section
90-ft Curb-to-curb
11 Reservation
California
Del Monte Posted Speed: 45-mph
85th % Speed: 43-mph

WIDE ROADWAY
& FAST SPEEDS
Downtown Specific Plan – Mobility
12 Downtown Specific Plan – Mobility
13 Features
incorporated with
roundabout
corridor
Speed Reduction Measure
Roundabout Corridor
Del Monte to Vista Del Camino
14 4-Lane Section

CONCEPT LAYOUT FOR

ILLUSTRATIVE PURPOSES
Roundabout Corridor
Vista Del Camino to Crescent
3-Lane & 4-Lane Section
15 CONCEPT LAYOUT FOR

ILLUSTRATIVE PURPOSES
Roundabout Corridor
Crescent to California
16 2-Lane Section

CONCEPT LAYOUT FOR

ILLUSTRATIVE PURPOSES
Del Monte / Reservation
17 TAMC Rail
Monterey
Recreation
Trail
MST Bus Stop
Starbucks
Bill Ring Corner

CONCEPT LAYOUT FOR

ILLUSTRATIVE PURPOSES
RRFB signs at all
bike/ped crossings
2-stage crossings
with median refuge

2. Corridor Analysis Results
18 Traffic Operations
•2040 AM & PM Peak Volumes
• Includes Downtown Specific Plan
•Traffic simulation model and analysis using SIDRA & VISSIM • Ideal tool for roundabout vs signal comparison
• Intersection vehicle delay, queues, level of service
• Roadway travel times, speeds
• Model bike, pedestrian, transit activity
19 Operations Summary
Signal Control – Option 1
Roundabout Control – Option 2
20 Reservation
C D

AM LOS PM LOS
LOS Ranking A to F
LOS D is City Standard

B C B B B B C C C C B B

B C A B A B A B A B B B A B
California
Del Monte
Crescent
De Forest
Marina Square
Seacrest
Vista Del Camino
Average Travel Times (Eastbound)
21 California
Del Monte
Crescent
De Forest
Marina Square
Seacrest
Vista Del Camino
AM PM
1-Mile Corridor
3m35s (15mph) 4m4s (14mph)
2m41s (22mph) 2m48s (21mph)
Reservation
Signal Control – Option 1
Roundabout Control – Option 2
Average Travel Times (Westbound)
22 California
Del Monte
Crescent
De Forest
Marina Square
Seacrest
Vista Del Camino
AM PM
1-Mile Corridor
4m7s (18mph) 5m2s (14mph)
2m31s (21mph) 3m8s (17mph)
Reservation
Signal Control – Option 1
Roundabout Control – Option 2
VISSIM Simulations
23 24
Year 2040 PM Peak

3. Recommendations
25 Corridor Summary – Safety
26 Criteria Signal
Option
Roundabout
Option Notes
Collision Severity
Potential High Low
Signal: High speed, 32 vehicle conflict
points at intersection
RAB: Low Speed, 8 vehicle conflict points
at intersection
Bicycle Access
Improvement Moderate High Signal: Protected Class II & IV facilities RAB: Separated Class I & IV facilities
Pedestrian Access
Improvement Moderate High
Signal: Long crossing exposure in road
RAB: Shorter crossing exposure & 2-stage
crosswalk movements
Downtown SP
Consistency for
Traffic Calming
Moderate High RAB: Provides lane reductions, bulb-outs, landscaping, reduced speeds
Downtown SP
Consistency for
Active Transportation
Moderate High RAB: Reduced speeds accommodate bike,
ped, and transit use on corridor
Corridor Summary – Operations
27 Criteria Signal
Option
Roundabout
Option Notes
Vehicle Delay Moderate Moderate Signal: Standing queues RAB: Moving queues
Travel Time Along
Corridor Moderate Low Signal: Standing queues
RAB: Moving queues
Transit & Emergency
Vehicle Access
Improvement
Moderate Moderate Transit and Emergency access maintained Driver Adaptation
Time Low Moderate Signal: Existing condition
RAB: Installed on other city streets
Driveway Impacts Low Moderate Signal: Existing driveways maintained RAB: Right turn only access
Corridor Summary – Economic
28 Criteria Signal
Option
Roundabout
Option Notes
Capital Construction
Cost Moderate to High High
Signal: Downtown SP cross-section
requires reconstruction
RAB: New infrastructure
Right of Way Impact Low Moderate
Signal: Downtown SP cross-section
requires reconstruction
RAB: New infrastructure, ROW impacts to
corner properties
Ongoing Operation
& Maintenance Cost High Moderate Signal: Electricity & equipment RAB: Landscaping
Environmental
Benefit Moderate High Roundabouts promote active
transportation and improved safety
Grant Funding
Availability Moderate to Low High Roundabouts promote active transportation and improved safety
Analysis Summary
•A roundabout at Reservation / Del Monte intersection is feasible •A roundabout corridor along Reservation Rd is feasible •Interim Condition:
• 2-lane roadway and single-lane roundabouts with turn lanes • 4-lane right of way
• Partial buildout of Downtown Specific Plan
•Ultimate Condition:
• 4-lane roadway and multi-lane roundabouts
• Full buildout of Downtown Specific Plan
29 Next Steps & Discussion
30 31
Driveway Access
32 California
Del Monte
Crescent
De Forest
Marina Square
Seacrest
Vista Del Camino
Vista Del Camino
Full Access
Right-in / Right-out Access
Driveway closure
Pedestrian Crossing Exposure
33 2-Lane Section
90-ft
60-ft
Reservation
Crescent
Reservation
Crescent
Roundabout Corridor
Interim & Ultimate Cross-Sections
Interim
34 Ultimate
Parking access behind
building frontage with
DVSP redevelopment
Roundabout Corridor
Interim & Ultimate Cross-Sections
35 Interim
Ultimate
Parking access behind
building frontage with
DVSP redevelopment
Del Monte / Reservation Queues
36 250-ft queue (PM)

CONCEPT LAYOUT FOR

ILLUSTRATIVE PURPOSES
Year 2040 vehicle queues in EB
and WB directions do not
spillback onto Del Monte or
Vista Del Camino intersections
380-ft queue (PM)
Multi-Lane Roundabouts
37 Beach/Pacific (Santa Cruz)
Alisal/Skyway (Salinas)
Multi-Lane Roundabouts
38SR1/ SR68 / 17 Mile Drive (Monterey)

Del Monte / Reservation
Del Monte Blvd
Reservation Rd
Existing Signal with Bike/Ped

CONCEPT LAYOUT FOR

ILLUSTRATIVE PURPOSES
Del Monte / Reservation
Del Monte Blvd
Roundabout Signal with Bike/Ped

CONCEPT LAYOUT FOR

ILLUSTRATIVE PURPOSES
Del Monte / Reservation
41 CONCEPT LAYOUT FOR

ILLUSTRATIVE PURPOSES
Proposed Del Monte
Blvd Median Landscaping
Starbucks Bill Ring Corner
Median changes with
roundabout layout
Roundabout Control
•Traffic Control - Yield at entry
•Traffic Deflection – Vehicles directed
into One-way counterclockwise flow
•Geometrics – Circular road & entry
angles designed to slow vehicle
speeds
Source: FHWA

Roundabout Control
Source: FHWA
RoundaboutTypical 4-leg Intersection
32 Conflict Points
Potential collisions are high
severity broadside or head-on
impacts
8 Conflict Points
Potential collisions are low
severity sideswipe or rear-end
impacts

LOW SPEED

HIGH SPEED
Pedestrian and Bicycle Circulation

Source: Mark Doctor, P.E., FHWA Resource Center
Roundabouts are Good for Older Drivers
• Lower Speeds through roundabout
• Forgiving, mistakes not lethal
• Longer decision-making time
• No demand to accurately judge closing speeds of fast traffic • Low energy crashes
• No wide visual scans
• Simple decision-making
• By 2020, the 85-percentile design driver will be someone aged 65 or older

Benefits Comparison
Roundabout Traffic Signals
Vehicle and
Driver Safety
Eliminates high-speed crashes and reduces fatalities
and injuries by 70+%
Numerous vehicle and pedestrian conflict points on standard intersection (32 vehicle/24 pedestrian)
Pedestrian and
Bicyclist Safety
Shorter one-directional crossings provide greater
pedestrian focus and awareness
Vehicles are more focused on signal changes than on
pedestrian movements
Space/
Development
Footprint
Reduces additional right-of-way between links of
intersections
May require additional turn lanes in future if traffic volumes or traffic patterns change
Cost and
Sustainability
Less expensive than a signal for greenfield construction (new location)
Increase in fuel consumption and emissions due to stopped and delayed vehicles during red lights
Traffic Capacity Creates equal priority for all approaches Typically prioritizes mainline traffic allowing progression of high volumes approaches
Access
Management
Provides equal priority of driveway/business access Requires drivers to make additional left turns or right turns to access certain properties/businesses
Aesthetics
Provides attractive entries and gateways to
communities
Various lighting and signing distractions can impact the overall aesthetic appeal for the user
Maintenance Pavement markings, lighting, and some landscape maintenance may be more intensive than signals
Requires staff time required to maintain signals, provide retiming, and conduct repair
Roundabout Perception
Source: US Department of Transportation: Federal Highway Administration

• Pedestrian experiences an exaggerated level of
security because the signals tell them it’s safe to
cross
• Most crashes occur when drivers turn left or right
across the crosswalk while the pedestrian has a
walk indication
Safety vs. Security at Signalized
Intersections
• Pedestrian feeling of security more
closely matches their actual level of
safety
Safety vs. Security at Roundabouts
50 Intersection
Intersection Geometry Notes
(Entry Lanes)
2040 Future Conditions
AM Peak
Hour
PM Peak
Hour
NB SB EB WB Delay LOS Delay LOS
1 Del Monte Ave & Reservation Rd L,T,R,R L,L,T,TR TL,TR L,L,T,R 26.1 C 29.9 D 2 Reservation Rd & Vista Del Camino TL, R TL, R L, T, TR L,T,T,R 14.5 B 22.7 C 3 Reservation Rd & Seacrest Ave L, R N/A T,T,R L,T,T 11.8 B 13.5 B 4 Reservation Rd & Shopping Center LTR TL,R L,T,TR T,T,R 10.2 B 11.3 B 5 Reservation Rd & De Forest Rd TL, R LTR L,T,T,R L,T,T,R 25.5 C 21.4 C 6 Reservation Rd & Cresent Ave TL,R TL,R L,T,T,R L,T,TR 31.5 C 34.8 C 7 Reservation Rd & California Ave L,R LTR L,T,TR L,T,TR 15.0 B 13.8 B Option 1A – Signal (4-Lane Road)
Intersection
Intersection Geometry Notes
(Entry Lanes)
2040 Future Conditions
AM Peak
Hour
PM Peak
Hour
NB SB EB WB Delay LOS Delay LOS
1 Del Monte Ave & Reservation Rd L,T,R,R L,L,T,TR TL,TR L,L,T,R 28.9 C 32.8 C 2 Reservation Rd & Vista Del Camino TL, R TL, R L, TR L,T,R 21.9 C 42.9 D 3 Reservation Rd & Seacrest Ave L, R N/A T,R L,T 15.3 B 26.1 C 4 Reservation Rd & Shopping Center LTR TL,R L,TR T,R 13.9 B 19.0 B 5 Reservation Rd & De Forest Rd TL, R LTR L,T,R L,T,R 32.6 C 30.8 C 6 Reservation Rd & Cresent Ave TL,R TL,R L,T,T,R L,T,TR 31.4 C 34.5 C 7 Reservation Rd & California Ave L,R LTR L,T,TR L,T,TR 15.0 B 13.8 B Option 1B – Signal & Road Diet (2-Lane Road)
Acceptable operations
but some left turn
pocket queue
spillback with 2-lane
road geometry
Acceptable operations
& queues with 4-lane
road geometry
Year 2040 Scenario
Year 2040 Scenario
1A - Signal (4-Lane Road) 1B - Signal (2-Lane Road)
52 Option 2C - 2-Lane Road & Single-Lane Roundabouts with Turn Lanes Option 2A - 4-Lane Road & Multi-Lane Roundabouts
Option 2B - 3-Lane Road & Multi-Lane Roundabouts
Acceptable
operations, long
vehicle queues
Acceptable operations
& queues with 4-lane
road geometry
Acceptable operations
& queues with 3-lane
road geometry
Year 2040 Scenario
Intersection
Intersection Geometry Notes (#
Circulating & Entry Lanes)
2040 Future Conditions
AM Peak Hour PM Peak Hour
NB SB EB WB Delay LOS V/C Delay LOS V/C
1 Del Monte Ave & Reservation Rd TL, R L, TR LTR L, TR 14.2 B 0.787 16.2 B 0.744 2 Reservation Rd & Vista Del Camino LTR LTR TL, TR TL, TR 7.5 A 0.555 14.5 B 0.712 3 Reservation Rd & Seacrest Ave LTR N/A T, TR TL, T 7.2 A 0.387 10.6 B 0.629 4 Reservation Rd & Shopping Center LTR LTR TL, TR TL, TR 6.3 A 0.354 7.5 A 0.463 5 Reservation Rd & De Forest Rd LTR LTR TL, TR TL, TR 6.6 A 0.376 7.8 A 0.463 6 Reservation Rd & Cresent Ave LTR LTR TL, TR TL, TR 7.7 A 0.417 9.8 A 0.584 7 Reservation Rd & California Ave LTR LTR TL, TR TL, TR 7.6 A 0.445 7.7 A 0.427 Intersection
Intersection Geometry Notes (#
Circulating & Entry Lanes)
2040 Future Conditions
AM Peak Hour PM Peak Hour
NB SB EB WB Delay LOS V/C Delay LOS V/C
1 Del Monte Ave & Reservation Rd TL, R L, TR LTR L, TR 14.2 B 0.787 16.2 C 0.744 2 Reservation Rd & Vista Del Camino LTR LTR TL, TR TL, TR 7.5 A 0.407 14.5 B 0.712 3 Reservation Rd & Seacrest Ave LTR N/A T, TR L, T 8.0 A 0.562 12.5 B 0.748 4 Reservation Rd & Shopping Center LTR LTR TL, TR TL, R 7.6 A 0.556 10.6 B 0.756 5 Reservation Rd & De Forest Rd LTR LTR TL, TR TL, R 8.0 A 0.577 11.4 B 0.776 6 Reservation Rd & Cresent Ave LTR LTR TL, TR L, TR 10.5 B 0.618 14.6 B 0.793 7 Reservation Rd & California Ave LTR LTR TL, R L, TR 9.8 A 0.631 12.0 B 0.719 Intersection
Intersection Geometry Notes (#
Circulating & Entry Lanes)
2040 Future Conditions
AM Peak Hour PM Peak Hour
NB SB EB WB Delay LOS V/C Delay LOS V/C
1 Del Monte Ave & Reservation Rd TL, R L, TR LTR L, TR 15.7 C 0.874 21.4 C 0.947 2 Reservation Rd & Vista Del Camino LTR LTR L, TR TL, TR 8.3 A 0.584 19.9 C 0.854 3 Reservation Rd & Seacrest Ave LTR N/A T, R L, T 9.0 A 0.553 22.1 C 0.982 4 Reservation Rd & Shopping Center LTR LTR L, TR TL, R 7.5 A 0.518 10.7 B 0.731 5 Reservation Rd & De Forest Rd LTR LTR L, TR TL, R 8.9 A 0.644 11.8 B 0.715 6 Reservation Rd & Cresent Ave LTR LTR TL, R L, TR 11.6 B 0.670 20.5 C 0.947 7 Reservation Rd & California Ave LTR LTR LTR LTR 18.5 C 0.853 20.3 C 0.838 53 Option 2C - 2-Lane Road & Single-Lane Roundabouts with Turn Lanes Option 2B - 3-Lane Road & Multi-Lane Roundabouts
Acceptable
operations, long
vehicle queues
Acceptable operations
& queues with 3-lane
road geometry
Year 2040 Scenario
Intersection
Intersection Geometry Notes (#
Circulating & Entry Lanes)
2040 Future Conditions
AM Peak Hour PM Peak Hour
NB SB EB WB Delay LOS V/C Delay LOS V/C
1 Del Monte Ave & Reservation Rd TL, R L, TR LTR L, TR 14.2 B 0.787 16.2 C 0.744 2 Reservation Rd & Vista Del Camino LTR LTR TL, TR TL, TR 7.5 A 0.407 14.5 B 0.712 3 Reservation Rd & Seacrest Ave LTR N/A T, TR L, T 8.0 A 0.562 12.5 B 0.748 4 Reservation Rd & Shopping Center LTR LTR TL, TR TL, R 7.6 A 0.556 10.6 B 0.756 5 Reservation Rd & De Forest Rd LTR LTR TL, TR TL, R 8.0 A 0.577 11.4 B 0.776 6 Reservation Rd & Cresent Ave LTR LTR TL, TR L, TR 10.5 B 0.618 14.6 B 0.793 7 Reservation Rd & California Ave LTR LTR TL, R L, TR 9.8 A 0.631 12.0 B 0.719 Intersection
Intersection Geometry Notes (#
Circulating & Entry Lanes)
2040 Future Conditions
AM Peak Hour PM Peak Hour
NB SB EB WB Delay LOS V/C Delay LOS V/C
1 Del Monte Ave & Reservation Rd TL, R L, TR LTR L, TR 15.7 C 0.874 21.4 C 0.947 2 Reservation Rd & Vista Del Camino LTR LTR L, TR TL, TR 8.3 A 0.584 19.9 C 0.854 3 Reservation Rd & Seacrest Ave LTR N/A T, R L, T 9.0 A 0.553 22.1 C 0.982 4 Reservation Rd & Shopping Center LTR LTR L, TR TL, R 7.5 A 0.518 10.7 B 0.731 5 Reservation Rd & De Forest Rd LTR LTR L, TR TL, R 8.9 A 0.644 11.8 B 0.715 6 Reservation Rd & Cresent Ave LTR LTR TL, R L, TR 11.6 B 0.670 20.5 C 0.947 7 Reservation Rd & California Ave LTR LTR LTR LTR 18.5 C 0.853 20.3 C 0.838 Option 2D – 2-Lane Road & Single Lane Roundabout Operations fail & queues spillback into
adjacent intersections
with 2-lane road &
single lane geometry
Intersection
Intersection Geometry Notes (#
Circulating & Entry Lanes)
2040 Future Conditions
AM Peak Hour PM Peak Hour
NB SB EB WB Delay LOS V/C Delay LOS V/C
1 Del Monte Ave & Reservation Rd TL, R L, TR LTR L, TR 17.2 C 0.787 17.7 B 0.721 2 Reservation Rd & Vista Del Camino LTR LTR LTR LTR 119.4 F 1.493 257.4 F 2.090 3 Reservation Rd & Seacrest Ave LTR N/A LTR LTR 24.7 C 0.918 43.8 E 1.075 4 Reservation Rd & Shopping Center LTR LTR LTR LTR 19.0 C 0.872 75.7 F 1.271 5 Reservation Rd & De Forest Rd LTR LTR LTR LTR 12.4 B 0.708 43.2 E 1.112 6 Reservation Rd & Cresent Ave LTR LTR LTR LTR 14.9 B 0.770 27.0 D 0.966 7 Reservation Rd & California Ave LTR LTR LTR LTR 16.3 B 0.822 29.5 C 0.998 2C - 2-Lane Road & SL Roundabouts+TL2A - 4-Lane Road & ML Roundabouts 2B - 3-Lane Road & ML Roundabouts # Intersection Approach /
MVMT
Lane Length
(ft)
Dual Entry Alternative; 2-Lane Road
2040 AM Peak 2040 AM Peak
Impact? 95% Queue
(ft) Impact? 95% Queue
(ft)
1 Del Monte Ave &
Reservation Rd
NB1 450 NO 47.4 NO 48.6
NB2 450 NO 32.5 NO 106.6
SB1 1000 NO 25.1 NO 17.3
SB2 200 NO 23 NO 11.2
EB1 1000 NO 124.1 NO 191.7
WB1 590 NO 40.9 NO 69
WB2 590 NO 47.8 NO 108.6
2 Reservation Rd &
Vista Del Camino
NB 100 NO 11.5 NO 48
SB 500 NO 17.1 NO 86.2
EB1 585 NO 11.9 NO 24.8
EB2 585 NO 54.9 NO 254.8
WB1 460 NO 24.4 NO 66.3
WB2 460 NO 29.9 NO 66.9
3 Reservation Rd &
Seacrest Ave
NB 200 NO 39.6 YES 220.9
EB1 460 NO 50.3 NO 147.3
EB2 460 NO 12.2 NO 17.3
WB1 470 NO 14.3 NO 23.2
WB2 470 NO 46.6 NO 108
4 Reservation Rd &
Shopping Center
NB 50 NO 1 NO 2.6
SB 150 NO 24 NO 20.8
EB1 470 NO 7.6 NO 8.2
EB2 470 NO 52.2 NO 93.1
WB1 210 NO 38.4 NO 64.8
WB2 210 NO 7.8 NO 6.2
5 Reservation Rd &
De Forest Rd
NB 200 NO 6.4 NO 39.5
SB 100 NO 27.3 NO 22.5
EB1 210 NO 69 NO 87.1
EB2 210 NO 1.9 NO 7.8
WB1 470 NO 41.7 NO 68.7
WB2 470 NO 6.8 NO 5
6 Reservation Rd &
Cresent Ave
NB 150 NO 58.1 YES 179.9
SB 150 NO 16.6 NO 11.5
EB1 470 NO 70.8 NO 145.2
EB2 470 NO 5.7 NO 9.5
WB1 500 NO 6.6 NO 13.4
WB2 500 NO 52.4 NO 120.5
7 Reservation Rd &
California Ave
NB 280 NO 75.3 NO 73.3
SB 50 NO 0.5 NO 1.3
EB1 350 NO 277.6 NO 229.9
EB2 350 NO NO
WB1 500 NO 89.5 NO 205.2
WB2 500 NO NO
# Intersection Approach /
MVMT
Lane Length
(ft)
Dual Entry Alternative; 3-Lane Road
2040 AM Peak 2040 AM Peak
Impact? 95% Queue
(ft) Impact? 95% Queue
(ft)
1 Del Monte Ave &
Reservation Rd
NB1 450 NO 44.9 NO 40.2
NB2 450 NO 31.3 NO 94
SB1 1000 NO 25.8 NO 14.1
SB2 200 NO 21.6 NO 9.1
EB1 1000 NO 73 NO 76
WB1 590 NO 36.4 NO 40.2
WB2 590 NO 30.8 NO 100.1
2 Reservation Rd &
Vista Del Camino
NB 100 NO 7.5 NO 22
SB 500 NO 12.8 NO 51.2
EB1 585 NO 23.1 NO 61.8
EB2 585 NO 23.1 NO 61.8
WB1 460 NO 20.2 NO 62.2
WB2 460 NO 20.2 NO 62.2
3 Reservation Rd &
Seacrest Ave
NB 200 NO 17.5 NO 43.6
EB1 460 NO 21.4 NO 31.9
EB2 460 NO 21.4 NO 31.9
WB1 470 NO 6.7 NO 10.9
WB2 470 NO 39.5 NO 143
4 Reservation Rd &
Shopping Center
NB 50 NO 0.7 NO 1.4
SB 150 NO 17.6 NO 11.5
EB1 470 NO 19.8 NO 30.1
EB2 470 NO 19.8 NO 30.1
WB1 210 NO 40.9 NO 83.2
WB2 210 NO 4 NO 3.2
5 Reservation Rd &
De Forest Rd
NB 200 NO 2.3 NO 11.8
SB 100 NO 19 NO 11.2
EB1 210 NO 20.7 NO 29.3
EB2 210 NO 20.7 NO 29.3
WB1 470 NO 47.5 NO 137.1
WB2 470 NO 3.6 NO 2.4
6 Reservation Rd &
Cresent Ave
NB 150 NO 20 NO 34.9
SB 150 NO 9.9 NO 6.2
EB1 470 NO 38.1 NO 82.5
EB2 470 NO 13.4 NO 17
WB1 500 NO 3.1 NO 6.1
WB2 500 NO 48.7 NO 190.8
7 Reservation Rd &
California Ave
NB 280 NO 32.1 NO 27.5
SB 50 NO 0.2 NO 0.3
EB1 350 NO 50.2 NO 86.2
EB2 350 NO 11 NO 5.8
WB1 500 NO 6.2 NO 5.5
WB2 500 NO 42.7 NO 69.1
# Intersection Approach /
MVMT
Lane Length
(ft)
Dual Entry Alternative; 4-Lane Road
2040 AM Peak 2040 AM Peak
Impact? 95% Queue
(ft) Impact? 95% Queue
(ft)
1 Del Monte Ave &
Reservation Rd
NB1 450 NO 111.7 NO 100
NB2 450 NO 80.2 NO 278.8
SB1 1000 NO 56.8 NO 31.7
SB2 200 NO 47.8 NO 20.9
EB1 1000 NO 165.2 NO 173.9
WB1 590 NO 86.8 NO 96.4
WB2 590 NO 73.3 NO 238.6
2 Reservation Rd &
Vista Del Camino
NB 100 NO 18.6 NO 54.7
SB 500 NO 31.9 NO 127.3
EB1 585 NO 95.8 NO 469
EB2 585 NO 30.7 NO 48
WB1 460 NO 50.1 NO 154.8
WB2 460 NO 50.1 NO 154.8
3 Reservation Rd &
Seacrest Ave
NB 200 NO 43.4 NO 108.3
EB1 460 NO 87.6 NO 282.5
EB2 460 NO 28.9 NO 40.7
WB1 470 NO 78.1 NO 241.4
WB2 470 NO 25.7 NO 37.1
4 Reservation Rd &
Shopping Center
NB 50 NO 1.7 NO 3.4
SB 150 NO 31 NO 21.1
EB1 470 NO 80.8 NO 137.4
EB2 470 NO 26.7 NO 37.8
WB1 210 NO 68.9 NO 106.3
WB2 210 NO 23.9 NO 32.5
5 Reservation Rd &
De Forest Rd
NB 200 NO 5.6 NO 29.1
SB 100 NO 35 NO 20.9
EB1 210 NO 81.3 NO 124.6
EB2 210 NO 29.6 NO 39.5
WB1 470 NO 72.5 NO 93.9
WB2 470 NO 26.5 NO 32.7
6 Reservation Rd &
Cresent Ave
NB 150 NO 49.7 NO 86.8
SB 150 NO 24.5 NO 15.4
EB1 470 NO 94.8 NO 205.3
EB2 470 NO 33.4 NO 42.2
WB1 500 NO 70.8 NO 174.1
WB2 500 NO 26.8 NO 38.3
7 Reservation Rd &
California Ave
NB 280 NO 59.9 NO 50.5
SB 50 NO 0.5 NO 0.8
EB1 350 NO 104.7 NO 104.8
EB2 350 NO 35.5 NO 35.3
WB1 500 NO 77 NO 92.8
WB2 500 NO 28.2 NO 32.5
2D - 2-Lane Road & SL Roundabouts
# Intersection Approach /
MVMT
Lane Length
(ft)
Single Lane Alternative; 2-Lane Road
2040 AM Peak 2040 AM Peak
Impact? 95% Queue
(ft) Impact? 95% Queue
(ft)
1 Del Monte Ave &
Reservation Rd
NB1 450 NO 111.7 NO 100
NB2 450 NO 80.2 NO 278.8
SB1 1000 NO 56.8 NO 31.7
SB2 200 NO 47.8 NO 20.9
EB1 1000 NO 165.2 NO 173.9
WB1 590 NO 86.8 NO 96.4
WB2 590 NO 73.3 NO 238.6
2 Reservation Rd &
Vista Del Camino
NB 100 NO 24.9 NO 62.7
SB 500 NO 45.2 NO 148.9
EB1 585 YES 738.7 YES 2901.7
EB2 585
WB1 460 YES 507.3 YES 2664
WB2 460
3 Reservation Rd &
Seacrest Ave
NB 200 NO 60.8 NO 147.3
EB1 460 YES 570.2 YES 2009.6
EB2 460
WB1 470 NO 370.9 YES 1653.3
WB2 470
4 Reservation Rd &
Shopping Center
NB 50 NO 2.2 NO 4.7
SB 150 NO 43.7 NO 28.6
EB1 470 NO 217.3 YES 1215.2
EB2 470
WB1 210 NO 168.3 YES 733.1
WB2 210
5 Reservation Rd &
De Forest Rd
NB 200 NO 7.5 NO 40.6
SB 100 NO 47.2 NO 27.7
EB1 210 YES 417.6 YES 1337.7
EB2 210
WB1 470 NO 184.4 YES 558.4
WB2 470
6 Reservation Rd &
Cresent Ave
NB 150 NO 68.9 NO 125
SB 150 NO 33.4 NO 20.7
EB1 470 YES 722.3 YES 1814.2
EB2 470
WB1 500 NO 283 YES 1222.9
WB2 500
7 Reservation Rd &
California Ave
NB 280 NO 79.8 NO 68.4
SB 50 NO 0.6 NO 1.1
EB1 350 YES 886.9 YES 819.3
EB2 350
WB1 500 NO 196.2 YES 600.1
WB2 500
# Intersection Approach /
MVMT
Lane Length
(ft)
Dual Lane Alternative; 4-Lane Road
2040 AM Peak 2040 AM Peak
Impact? 95% Queue
(ft) Impact? 95% Queue
(ft)
1 Del Monte Ave &
Reservation Rd
NBL 450 NO 111.7 NO 100
NBR 450 NO 80.2 NO 278.8
NBR2 1000 NO 56.8 NO 31.7
SBL 200 NO 47.8 NO 20.9
SBL2 1000 NO 165.2 NO 173.9
EBR 590 NO 86.8 NO 96.4
WBL 590 NO 73.3 NO 238.6
2 Reservation Rd &
Vista Del Camino
NB 100 NO 18.6 NO 54.7
SB 500 NO 31.9 NO 127.3
EB1 585 NO 95.8 NO 469
EB2 585 NO 30.7 NO 48
WB1 460 NO 50.1 NO 154.8
WB2 460 NO 50.1 NO 154.8
3 Reservation Rd &
Seacrest Ave
NB 200 NO 43.4 NO 108.3
EB1 460 NO 87.6 NO 282.5
EB2 460 NO 28.9 NO 40.7
WB1 470 NO 78.1 NO 241.4
WB2 470 NO 25.7 NO 37.1
4 Reservation Rd &
Shopping Center
NB 50 NO 1.7 NO 3.4
SB 150 NO 31 NO 21.1
EB1 470 NO 80.8 NO 137.4
EB2 470 NO 26.7 NO 37.8
WB1 210 NO 68.9 NO 106.3
WB2 210 NO 23.9 NO 32.5
5 Reservation Rd &
De Forest Rd
NB 200 NO 5.6 NO 29.1
SB 100 NO 35 NO 20.9
EB1 210 NO 81.3 NO 124.6
EB2 210 NO 29.6 NO 39.5
WB1 470 NO 72.5 NO 93.9
WB2 470 NO 26.5 NO 32.7
6 Reservation Rd &
Cresent Ave
NB 150 NO 49.7 NO 86.8
SB 150 NO 24.5 NO 15.4
EB1 470 NO 94.8 NO 205.3
EB2 470 NO 33.4 NO 42.2
WB1 500 NO 70.8 NO 174.1
WB2 500 NO 26.8 NO 38.3
7 Reservation Rd &
California Ave
NB 280 NO 59.9 NO 50.5
SB 50 NO 0.5 NO 0.8
EB1 350 NO 104.7 NO 104.8
EB2 350 NO 35.5 NO 35.3
WB1 500 NO 77 NO 92.8
WB2 500 NO 28.2 NO 32.5
2A - 4-Lane Road & ML Roundabouts 2B - 3-Lane Road & ML Roundabouts # Intersection Approach /
MVMT
Lane Length
(ft)
Dual Lane Alternative; 3-Lane Road
2040 AM Peak 2040 AM Peak
Impact? 95% Queue
(ft) Impact? 95% Queue
(ft)
1 Del Monte Ave &
Reservation Rd
NBL 450 NO 111.7 NO 100
NBR 450 NO 80.2 NO 278.8
NBR2 1000 NO 56.8 NO 31.7
SBL 200 NO 47.8 NO 20.9
SBL2 1000 NO 165.2 NO 173.9
EBR 590 NO 86.8 NO 96.4
WBL 590 NO 73.3 NO 238.6
2 Reservation Rd &
Vista Del Camino
NB 100 NO 15.6 NO 48.4
SB 500 NO 31.9 NO 127.3
EB1 585 NO 57.3 NO 153.6
EB2 585 NO 57.3 NO 153.6
WB1 460 NO 45.8 NO 146
WB2 460 NO 45.8 NO 146
3 Reservation Rd &
Seacrest Ave
NB 200 NO 43.4 NO 108.3
EB1 460 NO 53.3 NO 79.4
EB2 460 NO 53.3 NO 79.4
WB1 470 NO 16.7 NO 27
WB2 470 NO 98.1 NO 355.5
4 Reservation Rd &
Shopping Center
NB 50 NO 1.7 NO 3.4
SB 150 NO 43.7 NO 28.6
EB1 470 NO 49.1 NO 74.8
EB2 470 NO 49.1 NO 74.8
WB1 210 NO 101.8 NO 206.9
WB2 210 NO 10.1 NO 8
5 Reservation Rd &
De Forest Rd
NB 200 NO 5.6 NO 29.1
SB 100 NO 47.2 NO 27.7
EB1 210 NO 51.6 NO 72.8
EB2 210 NO 51.6 NO 72.8
WB1 470 NO 118.1 NO 270.4
WB2 470 NO 9 NO 5.9
6 Reservation Rd &
Cresent Ave
NB 150 NO 49.7 NO 86.8
SB 150 NO 24.5 NO 15.4
EB1 470 NO 94.8 NO 205.3
EB2 470 NO 33.4 NO 42.2
WB1 500 NO 7.7 NO 15.3
WB2 500 NO 121.1 NO 474.5
7 Reservation Rd &
California Ave
NB 280 NO 79.8 NO 68.4
SB 50 NO 0.5 NO 0.8
EB1 350 NO 124.8 NO 214.3
EB2 350 NO 27.3 NO 14.5
WB1 500 NO 15.5 NO 13.7
WB2 500 NO 106.1 NO 171.8
Traffic Volumes
•2040 Traffic forecasts
• From AMBAG Travel Demand Model
• Includes traffic and travel pattern changes from
• Marina Downtown Plan
• Regional growth and roadway improvements
56 Year 2018 Traffic Volumes
Reservation
538(983) 571(941)
493(955)
XX – AM Volume
(XX) – PM Volume
705(832)689(875)
1 2 3
1 2 3
57 701(555)
574(885)
705(832)
Reservation1 2 3
Year 2040 Traffic Volumes
829(1032)
766(1047)775(1065)
1 2 3
872(1099)
58 XX – AM Volume
(XX) – PM Volume
765(951)
771(967)
766(1044)
785(670)
Year 2018 Traffic Volumes
Reservation
575(962) 598(980)
705(767)757(735)
4 5 6
4 5 6
59 7
7 653(915)
706(738)
XX – AM Volume
(XX) – PM Volume
Reservation4 5 6 7
Year 2040 Traffic Volumes
876(1063)
745(962)789(925)
4 5 6
XX – AM Volume
(XX) – PM Volume
805(1072)
60 930(970)
795(932)
7 Through Volumes WB (R to SR1)
61 7,000 trips
8,750 trips 2018
10,650 trips 2040
Through Volumes EB (SR1 to R)
62 1,150 trips
9,800 trips 2018
10,099 trips 2040
May 1, 2025 Item No: 13d

Honorable Mayor and Members of the
Regular Meeting
Marina City Council of May 6, 2025

CITY COUNCIL TO PROVIDE DIRECTION TO STAFF ON SEVERAL
ITEMS DISCUSSED AT THE APRIL 29, 2025, JOINT MEETING WITH THE

MONTEREY PENINSULA REGIONAL PARKS DISTRICT (MPRPD)
BOARD. THIS PRESENTATION IS EXEMPT FROM ENVIRONMENTAL
REVIEW PER SEC. 15378 OF THE CEQA GUIDELINES.

REQUEST:

It is requested that the City Council provide direction to the City Manager on the following short- and long-term projects to occur at Locke-Paddon Park (LPP)

BACKGROUND:

The City Council and MPRPD Board held a joint meeting on Tuesday, April 29, 2025, to hear a staff presentation on the history of the Park and the deed restrictions and development constraints known to be in effect on the subject parcels, and to receive public comment and brief Council/Board member comments on goals for Park maintenance and improvements moving forward.

Staff requests that the Council authorize the following short-term actions and activities:

1. Direct staff and the City Attorney to initiate a discussion with MPRPD staff and counsel to determine the appropriate instrument (lease, MOU, or other) needed to pursue the development of an approximately one (1) acre Asian Community Garden at the south end of Lot 43 and begin the work of creating a Coastal Development Permit (CDP) application and EIR;

2. Direct staff to begin discussions with MPRPD staff on the process to trim the existing Cypress trees on Lots 42 and 43 (Isakson property) and along the south side of Seaside Circle (APN 033-121-010), as needed;

3. Direct City staff to begin working with MPRPD staff on a new maintenance agreement that defines roles and responsibilities between the parties; and

4. Direct staff to request that MPRPD remove the residual radio tower infrastructure remaining on APN -006 at its earliest opportunity.

Staff further requests that the Council authorize the following long-term actions and activities:

1. Staff preparation of a comprehensive pond management/maintenance/restoration plan based on the following two (2) strategies:
a. A CEQA-exempt “Cutting the Green Tape” restoration-based management plan, or b. A larger-scale plan that would require an EIR and permitting by multiple agencies

2. Potential land swap to facilitate the management of lands based on each agencies’ mission and community goals.

Council direction can also include coordinating with MPRPD to ensure any existing or future improvements to City development on MPRPD -owned property has appropriate documentation and approvals.

FISCAL IMPACT:

The Council has allocated funding for the Cypress tree trimming . Funding for the other short - and long-term items, such as the development of the Asian Community Garden, has not yet been identified.

ENVIRONMENTAL REVIEW:

This request for direction qualifies for a CEQA exemption per § 15378 (b)(5) of the CEQA Guidelines which allows for o rganizational or administrative activities of governments that will not result in direct or indirect physical changes in the environment.

CONCLUSION:

To ensure that the momentum obtained at the joint meeting on April 29 th is maintained, staff requests that clear direction on the above items be provided.

Respectfully submitted,

_________________________
Alyson Hunter, AICP
Planning Manager, Community Development Dept.

City of Marina

Reviewed/concur:

_________________________
Guido Persicone, AICP
Director, Community Development Dept.

City of Marina

Reviewed/concur:

_________________________
Layne Long
City Manager
City of Marina