B. Verify base flashing is in place, sealed, and secure.
3.02 INSTALLATION
A. Perform work in accordance with the following:
1. 2022 CBC and local building code requirements.
2. NRCA (National Roofing Contractors Association) - Roofing Manual.
3. SMACNA (Sheet Metal and Air Conditioning Contractors National Association) - Architectural Sheet Metal Manual.
B. Install starter and edge strips, and cleats.
C. Fit components tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles.
D. Seal metal joints watertight.
E. Attach gutters per manufacturer’s recommendations.
END OF SECTION
PASE – December 2024
270-30-23-22
07900 - 1
Sealants and Caulking
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 07900
SEALANTS AND CAULKING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Furnishing and installing sealants and caulking as shown and as specified.
B. At Contractor’s option, provide the sealant and caulking work by own forces, by a specialty contractor, or by the subcontractors for the various parts of the work who normally provide their own sealants and caulking, or by any combination of the above choices.
1.02 REFERENCED SECTION
A. The following Section is referenced in this Section
1. Section 01330 – Submittals
1.03 SUBMITTALS
A. Comply with Section 01330.
B. Manufacturer’s Data
1. Manufacturer’s specifications, recommendations, and installation instructions for each type ofsealant, caulking and associatedmiscellaneousmaterialrequired.
2. Include manufacturer’s published data, letter of certification, or certified laboratory test report, indicating that each material complies with the requirements of the Contract Documents, and is intended for the uses and applications shown and/or specified.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Acceptable Manufacturers
1. Polyurethane Sealants: Mameco International; Sika Chemical Corp.; SonnebornContech; Tremco, Inc. (Dymeric); and Pecora (Dynatrol I or Dynatrol II).
2. Silicone Sealants: General Electric Co.; Dow Corning Corp.; and Pecora.
3. Compressible Sealant: Sandell Manufacturing Company, Inc.
B. Sealants—General
1. Provide colors matching materials being sealed. Where compound is not exposed to view in finished work, provide manufacturer’s color which has best performance.
2. Provide non-sagging sealant for vertical joints.
3. Sealants for horizontal joints may be self-leveling.
4. Before use of any sealant, investigate its compatibility with joint surfaces, fillers and other materials in joint system. Use only compatible materials.
PASE – December 2024
270-30-23-22
07900 - 2
Sealants and Caulking
City of Milpitas
WellUpgrades Program
McCandless Well Facility
5. Obtain sealing compounds from manufacturers who will provide manufacturers’ field service representatives at project site for purpose of advising and instructing installers in proper procedures. Provide such services, at no expense to the City.
6. All Areas:
a. Polyurethane, or
b. Silicone.
7. Use compressible sealant where indicated.
8. Sealant materials shall be commercial grade products.
C. Sealant, Polyurethane: One or two component.
D. Sealant, Silicone: One or two component.
E. Joint Cleaner: Asrecommended by sealant manufacturer.
F. Primer-Sealer: Asrecommended by sealant manufacturer.
G. Bond Breaker: As recommended by sealant manufacturer.
H. Sealant Backer Rod: Rod stock of polyethylene, polyethylene jacketed polyurethane foam, or other flexible, non-absorbent, non-bituminous material recommended by sealant manufacturer to:
1. Control joint depth.
2. Break bond of sealant at bottom of joint.
3. Provide propershape of sealant bead.
I. Sealant, Compressible
1. Size so that width of material is twice joint width.
2. Foamed polyurethane strip saturated with polymerized polybutylene waterproofing on front face with non-reactive release agent that will act as bond breaker for applied sealant: Polytite-B.
J. Adhesive, compressible sealant: Sandell No. 14.
PART 3 - EXECUTION
3.01 PREPARATION
A. Installer shall inspect the work to which sealants and/or caulking is to be applied and notify the Contractor in writing, with copy to the Engineer, of all conditions detrimental to the timely completion of the work.
B. Do not proceed with the work of this Section until all unsatisfactory conditions have been corrected in a manner acceptable to the manufacturer of the materials.
3.02 INSTALLATION
A. Seal building and any joints or areas which will permit penetration of moisture or access by insects or other pests. Make all joints water and airtight.
B. Where required, prime joint surfaces. Limit application to surfaces to receive caulking.
Mask off adjacent surfaces.
PASE – December 2024
270-30-23-22
07900 - 3
Sealants and Caulking
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Make depth ofsealing compounds not more than½ width of joint, but in no case lessthan 1/4-inch (6 mm).
1. Sub-caulk joints that are deep, or joints without suitable backstop, to proper depth.
2. Protect side walls of joint (to depth of caulking) with Sandell No. 3 tape.
3. Install with adhesive on 2 faces in contact with sides of joints.
D. If joint is too shallow for use of backer rod, apply bond breaker to back of joint as recommended by sealant manufacturer. If bond breaker is used, apply it carefully to avoid prevention of sealant bond to sides of joints.
E. Use guns where possible to insure penetration and density. Finish joint densely and completely filled, producing a smooth surface.
F. In all rooms,seal all penetrations and recessed itemsthrough the floors, walls and ceilings with concealed silicone sealant. This includes such items as electrical device cover plates, pipes, fire extinguisher cabinets, etc.
3.03 PROTECTION AND CLEANING
A. Areas adjacent to jointsto be sealed shall be protected against smearing.
B. Paper masking tape may be used if removed within ten minutes after the joint has been filled with sealant.
C. Fresh compound that has been smeared on adjacentsurfaces shall be immediately wiped off the surface with a clean rag, and all residue removed using methyl ethyl ketone, toluene, or other similar material, taking care not to damage the finish coating of the material being cleaned.
END OF SECTION
PASE – December 2024
270-30-23-22
07900 - 4
Sealants and Caulking
City of Milpitas
WellUpgrades Program
McCandless Well Facility
(THIS PAGE LEFT BLANK INTENTIONALLY)
PASE – December 2024
270-30-23-22
07910 - 1
Preformed Joint Fillers
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 07910
PREFORMED JOINT FILLERS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Preformed joint fillers.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 07900 – Sealants and Caulking
1.03 SUBMITTALS
A. Comply with Section 01330 and include the following information:
1. Complete product information.
2. The manufacturer’s recommendations for handling and installation of the material.
PART 2 - PRODUCTS
2.01 PREFORMED ASPHALT FIBERBOARD
A. Preformed asphalt fiberboard joint filler in accordance with ASTM D994, 1/2 inch thick, unless otherwise specified.
2.02 PREFORMED RESIN-BONDED CORK
A. Preformed resin-bonded cork joint fillershall be in accordance with ASTM D1752, Type II.
B. Cork joint filler thickness shall match the specified joint width.
PART 3 - EXECUTION
3.01 GENERAL
A. Place preformed joint fillers into position before the concrete is poured.
B. Where it is necessary for the filler to be fixed to existing concrete or other building materials, use a suitable adhesive recommended by the filler manufacturer.
C. Filler surfacesshall be clean and dry prior to the placement of the concrete.
3.02 PREFORMED ASPHALT FIBERBOARD
A. Preformed asphalt fiberboard joint fillers shall be used for expansion joints in concrete sidewalks, curbs, and roadways.
3.03 PREFORMED RESIN-BONDED CORK
A. Preformed resin-bonded cork joint filler shall be used for expansion joints in concrete structures.
PASE – December 2024
270-30-23-22
07910 - 2
Preformed Joint Fillers
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. Seal the expansion joint with backer rod and sealant as specified in Section 07900.
END OF SECTION
PASE – December 2024
270-30-23-22
08110 - 1
Metal Doors and Frames
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 08110
METAL DOORS AND FRAMES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Steel doors and steel door frames.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 08710 – Finish Hardware
1.03 QUALITY ASSURANCE
A. Certificates of Compliance
1. Provide manufacturer’s certificates attesting that doors, frames, and accessories meet the specified requirements.
2. Include the grade and model number of each door.
1.04 SUBMITTALS
A. Comply with Section 01330 and include the following items:
1. Shop drawings containing the following information:
a. Elevations of each door type
b. Size of doors and frames
c. Metal gages
d. Details of door and frame construction
e. Methods of anchorage
f. Provisions for and location of hardware
g. Details of installation
h. Schedule showing location of each door, frame, and swing of door
2. Detail specifications and instructions for installation, adjustments, cleaning, and maintenance.
1.05 DELIVERY AND STORAGE
A. Doors, frames, and accessories shall be delivered undamaged and with protective wrappings or packaging.
B. Doors and frames shall be stored on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4-inch airspace between doors.
C. Remove damp or wet packaging immediately wipe dry affected surfaces.
D. Replace damaged materials with new.
PASE – December 2024
270-30-23-22
08110 - 2
Metal Doors and Frames
City of Milpitas
WellUpgrades Program
McCandless Well Facility
PART 2 - PRODUCTS
2.01 STEEL DOORS
A. General
1. 1-3/4 inches thick, 16 gage, and conform to ANSI 100 unless otherwise specified.
2. Composite construction prepared to receive hardware specified in Section 08710.
B. The internal construction of the doors shall conform to one of the following methods, in accordance with the manufacturer’sstandard practice:
1. Vertical and/or horizontal steel, rigidly formed members shall have sound deadening applied to the inside to eliminate metallic sound incident to normal door operation.
2. Honeycomb, polyurethane, or solid structural mineral core bonded to the inside of both faces of the door.
3. Other methods of reinforcing may be used, provided they achieve the same degree of flatness, rigidity, sound deadening and strength as the methods listed above.
2.02 STANDARD STEEL FRAMES
A. General
1. Steel frames shall conform to ANSI 100,shall be of the sizes and shapes specified, and unless otherwise specified, shall be fully welded unit type frames. Steel frames shall be provided for doors, sidelites, and transoms.
B. Welded Frames
1. Frame faces shall be continuously welded at corner joints.
2. Stops and rabbets shall be mechanically interlocked or continuously welded.
3. All welds shall be ground smooth.
4. Frames shall be mortised and reinforced with heavy gage reinforcements for hinges and lock strikes.
5. Steel spreaders to ensure proper alignment of the frame shall be used and shall remain in place until the adjacent wall construction is complete.
C. Anchors
1. General
a. Provide steel anchors to secure the frame to adjoining construction. b. Anchors shall be zinc-coated or painted with rust-inhibitive paint, not lighter than 18 gage.
2. Wall Anchors
a. Provide a minimum of four anchors for each jamb.
PASE – December 2024
270-30-23-22
08110 - 3
Metal Doors and Frames
City of Milpitas
WellUpgrades Program
McCandless Well Facility
b. Locate anchors opposite top and bottom hinges and at equal spaces in between.
1) Anchors for masonry work shall be corrugated or perforated steel straps or 3/16-inch diameter steel wire, adjustable or T-shaped. 2) Anchors for stud partitionsshall be welded or otherwise securely fastened to backs of frames.
a) Anchors shall be designed and fastened to wood studs with nails, to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding.
3) Frames shall be secured to previously placed concrete or masonry with expansion bolts in accordance with SDI 111-F. 4) Anchors for solid plaster partitions shall be secured solidly to back of frames and tied into the lath.
a) Adjustable top strut anchors shall be provided on each side of frame for fastening to structural members or
ceiling construction above.
b) Size and type of strut anchors shall be as recommended by the frame manufacturer.
3. Floor Anchors
a. Provide at bottom of each jamb member, drilled for 3/8-inch anchor bolts.
b. Where floor fill occurs, bottom of frames shall be terminated at the indicated finished floor levels and supported by adjustable extension clips resting on and anchored to the structural slabs.
2.03 INSULATED ROLL-UP DOORS
A. General
1. Doors shall be spring loaded, hand chain operated, coiling doors with steel hood and hand chain lock.
2. Coiling doors shall be Atlas Door, Cornell Iron Works, or approved equal.
3. Provide doors, guides, and accessories from one manufacturer.
4. Provide locking slide bolts on door interior.
B. Material
1. Galvanized steel interlocked curtain with baked-on epoxy modified polyester finish. Color to be selected by the City.
2. Design door and structural steel angles and guides for wind load per ASCE 7-16.
A basic wind speed of 100 miles per hour and Exposure Category C shall be used.
3. Spring counter balance housed in a steel pipe with 24 gauge galvanized steel hood.
PASE – December 2024
270-30-23-22
08110 - 4
Metal Doors and Frames
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Insulated Door Slat Material Requirements
1. Flame Spread Index of zero and a Smoke Developed Index of 10 as tested per ASTM E84.
2. Minimum Sound Transmission Class (STC) rating of 26 as tested per ASTM E90.
3. Minimum R-value of 8.0 (U-factor of 0.125) as calculated using the ASHRAE Handbook of Fundamentals.
4. Insulation to be CFC Free with an Ozone Depletion Potential (ODP) rating ofzero.
D. Weather Stripping
1. Bottom Bar: Replaceable, bulb-style, compressible EDPM gasket extending into guides.
2. Hood: Neorenet/rayon baffle to impede air flow above coil.
2.04 ASTRAGALS
A. Pairs of exterior steel doors which will not have aluminum astragals or removable mullions shall have overlapping steel astragals provided with the doors.
2.05 WEATHER STRIPPING
A. As specified in Section 08710.
2.06 HARDWARE PREPARATION
A. Doors and frames to receive finish hardware shall be reinforced, drilled, and tapped for hardware in accordance with the applicable requirements of SDI 107 and ANSI A115.1 and A115.4.
B. Drilling and tapping for surface-applied hardware shall be done in the field, but additional reinforcing for surface-applied hardware shall be built into the door at the factory.
C. Hardware shall be located in accordance with the requirements of ANSI 100, as applicable.
2.07 FINISHES
A. Hot-Dip Zinc-Coated and Factory-Primed Finish
1. Doors and frames shall be fabricated from galvanized steel, ASTM A653, Coating Designation G60 or A60 (galvannealed).
2. Damaged zinc-coated surfaces shall be repaired by the application of zinc dust paint conforming to DOD-P-21035.
3. Zinc-coated surfaces shall be phosphate treated and factory primed as specified in ANSI 100.
2.08 FABRICATION AND WORKMANSHIP
A. Finished doors and frames shall be strong and rigid, neat in appearance, and free from defects, waves, scratches, cuts, dents, ridges, holes, warp, and buckle.
B. Molded members shall be clean cut, straight, and true, with joints coped or mitered, well formed, and in true alignment.
PASE – December 2024
270-30-23-22
08110 - 5
Metal Doors and Frames
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Exposed welded and soldered joints shall be ground smooth.
D. Door frame sectionsshall be designed for use with the wall construction specified.
E. Corner joints shall be well formed and in true alignment.
F. Conceal fastenings where practicable.
G. On wraparound frames for masonry partitions, a throat opening shall be provided 1/8 inch larger than the actual masonry thickness.
H. Frames in exposed masonry walls or partitionsshall be designed to allow sufficient space between the inside back of trim and masonry to receive caulking compound.
2.09 PRODUCT DATA
A. Certificates of compliance specified in paragraph 1.03 shall be provided as product data in accordance with Section 01330.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Frames
1. Set frames in accordance with SDI 105, and plumbed, aligned, and braced securely until permanent anchors are set.
2. Anchor bottoms of frames with expansion bolts or powder-actuated fasteners.
3. Wall anchors shall be built in or secured to adjoining construction.
4. Anchor frames to the struts or bracing where frames require ceiling struts or overhead bracing.
5. Backfill frames with mortar.
6. When an additive is provided in the mortar, inside of frames shall be coated with corrosion-inhibiting bituminous material.
7. For frames to be installed in exterior walls and to be filled with mortar or grout, the stops shall be filled with strips of rigid insulation to keep the grout out of the stops and to facilitate installation of stop-applied head and jamb seals.
B. Doors
1. Hang doors in accordance with clearances specified in ANSI 100.
2. Clean and adjust hardware after erection and glazing.
3.02 PROTECTION
A. Doors and frames shall be protected from damage, and damaged doors and frames repaired prior to completion and acceptance of the project or replaced with new, as directed.
B. Rusted frames shall be wire brushed until all rust is removed, cleaned thoroughly, and applied with an all-over coat of rust-inhibitive paint of the same type used for shop coat.
PASE – December 2024
270-30-23-22
08110 - 6
Metal Doors and Frames
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3.03 CLEANING
A. Thoroughly clean exposed surfaces of doors and frames upon completion.
B. Mastic smears and other unsightly marks shall be removed.
END OF SECTION
PASE – December 2024
270-30-23-22
08710 - 1
Finish Hardware
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 08710
FINISH HARDWARE
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Furnish and install all necessary architectural finish hardware to complete the Project.
Furnish templates for door and frame preparation.
1.02 REFERENCED SECTIONS
A. The following Section is referenced in this Section.
1. Section 01330 – Submittals
1.03 REFERENCES
A. DHI: Door and Hardware Institute
B. NAAMM: National Association of Architectural Metal Manufacturers C. NFPA 101: Life Safety Code
1.04 SUBMITTALS
A. Comply with Section 01330.
B. Provide product data on specified hardware. Indicate locations and mounting heights of each type of hardware.
C. Submit manufacturer’s parts lists, templates, and installation instructions.
1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver hardware with items packed separately, complete and ready for installation with necessary fittings, trim, fasteners, and accessories. Mark packages clearly for identification in accordance with Hardware Schedule. Deliver hardware so that work may progress without delay or interruption.
B. Upon delivery of the finish hardware to the job site, the Contractor shall be responsible for all material. Protect hardware from damage at all times prior to and after its installation.
1.06 COORDINATION
A. Coordinate work of this Section with other directly affected Sections involving manufacturer of any internal reinforcement for door hardware.
B. Hardware shall be manufactured to template. Provide templates and, if necessary, the physical hardware to fabricator of doors and frames in ample time to facilitate the work.
1.07 MAINTENANCE MATERIALS
A. Provide special wrenches and tools applicable to each different or special hardware component.
PASE – December 2024
270-30-23-22
08710 - 2
Finish Hardware
City of Milpitas
WellUpgrades Program
McCandless Well Facility
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Equivalent products by the other named manufacturers in the list below and within the hardware group listings are also acceptable except for locksets and cylinders.
1. Butts and Hinges: Ives, McKinney, Stanley.
2. Locksets and Latchsets: Schlage.
3. Cylinders: Schlage.
4. Panic Hardware: Von Duprin, Sargent.
5. Slide Bolts and Foot Bolts: McKinney, Stanley.
6. Weather Stripping, Thresholds and Door Bottom Sweeps: Pemko.
7. Stops/Holders: Rockwood, Quality.
8. Closers: LCN Series 4010.
9. Lock Guards: Ives.
10. Silencers: Glynn-Johnson.
2.02 HINGES
A. Provide butt hinges of the five-knuckle, full mortise type, having two or four ball or oilite bearings as noted, stainless steel pins, and complying with ANSI A156.1.
B. Provide all out swinging doors to the exterior with butt hinges of the stainless steel or non-ferrous material, with non-removable pins of the set screw type. Ives 5BB1HW NRP, or equal.
C. Hinge Size:
1. Doors 1-3/4” in thickness to 37” in width shall be provided with 4-1/2” x 4-1/2” butt hinges provided with at least two ball or oilite bearings; wider and heavier doors with 5” x 5” extra heavy butt hinges provided with four ball or oilite bearings.
2. Butt hinges for doors thicker than those noted above or with unusual trim conditions which would interfere with the full opening of the door shall be provided with hinges ofsufficientsize to support the door weight adequately, and of sufficient width to clear adjacent trim.
D. Number of Hinges per Door Leaf:
1. Provide two hinges per door leaf for doors up to 60” high; three hinges per leaf for doors up to 90” high; one additional butt hinge for each additional 30” in height, or fraction thereof.
2.03 LATCHSETS AND CYLINDERS
A. Design: Provide Schlage Model ND94PD at exterior doors and Schlage Model ND10S at interior doors. All levers shall be Athens style.
B. Provide Large Format Interchangeable Cores.
PASE – December 2024
270-30-23-22
08710 - 3
Finish Hardware
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Strikes: Provide each lockset, latchset, or deadlock with a box strike. Provide standard type strikes with extended lips where required to protect adjacent trim from being marred by latch bolt. Verify cutout types provided in metal frames.
D. Deadbolts: Provide keyed deadbolts, double cylinder, at each exterior door, minimum 1- 1/2-inch throw, Schlage B562P.
E. Panic Hardware: Exit devicesshall be UL listed panic hardware with heavy-duty push pads as manufactured by Von Duprin, 98/99 Series.
2.04 DOOR BOTTOM SWEEPS, THRESHOLDS AND WEATHER STRIPPING A. All exterior doors shall be fitted with door bottom sweep, threshold set in sealant, and weather stripping.
B. Door bottoms shall be designed to seal space below door and prevent entry of wasps and other pests.
2.05 STOPS/HOLDERS
A. Provide each door leaf with a door stop and latch holder mounted on outside concrete surface with concrete expansion anchors. Provide stops of proper size and height to prevent doors from hitting walls or fixed objects.
2.06 LOCK GUARDS
A. Provide lock guards on all exterior doors. Construct of stainless steel, with 626 brushed chrome finish, with no exposed fasteners on face of unit.
2.07 SILENCERS
A. Provide each door with a press-metal frame with rubber silencers. Provide each single door with three silencers, each pair of doors with four.
2.08 KEYS AND KEYING
A. Provide a construction keying system for Contractor’s and/or City’s use during construction. Contractor shall retain construction keys and inserts and turn over to the City upon completion of construction.
B. Coordinate the changeover to permanent keyways with the City at completion of station commissioning.
2.09 FINISH
A. All hardware shall have brushed chrome finish (626) for interior and exterior installations typically, unless noted otherwise.
1. Provide over steel base metal (BHMA 626), typical, where required by code.
2.10 HARDWARE SCHEDULE
A. Door hardware sets shall conform to the following schedule. Numbers and references in hardware schedule establish quality to be furnished and installed. Suitable types having similar quality and operation as finish hardware specified may be furnished when approved by the City.
1. Door Hardware Type A: Each door shall have:
PASE – December 2024
270-30-23-22
08710 - 4
Finish Hardware
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3 pairs Hinges
1 Lockset
1 Strike
1 Door Stop/Holder
1 Closer
1 Threshold
1 set Weather Stripping
1 Door Bottom Sweep
1 set Silencers
1 Deadbolt
2. Door Hardware Type B: Each pair of doors shall have:
6 pairs Hinges
1 Lockset
1 Strike
2 Door Stops/Holders
2 Closers
2 Thresholds
2 sets Weather Stripping
2 Door Bottom Sweeps
2 sets Silencers
1 Deadbolt
1 set Slide Bolts
1 set Foot Bolts
1 Astragal
3. Door Hardware Type C: Each door shall have:
3 pairs Hinges
1 Latchset
1 Strike
1 Door Stop/Holder
1 set Silencers
PART 3 - EXECUTION
3.01 PACKING AND MARKING
A. Package all items of hardware in its individual container marked with the manufacturer’s name, type number, and name of item.
B. Each item shall be complete with necessary fastenings, wrenches, spanners, etc., installation instructions, and templates, indelibly, legibly, and carefully marked with an item number corresponding to the room name and hardware group number as indicated on the Plans and hardware schedule provided by supplier.
PASE – December 2024
270-30-23-22
08710 - 5
Finish Hardware
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3.02 EXAMINATION
A. Inspect all doors, frames, and other surfaces to receive items or finish hardware and report all defects which might adversely affect the installation or function of the hardware. Commencement of work will imply acceptance ofsurfaces as being satisfactory and adequate.
B. Coordinate and be responsible for the proper fabrication of all work or material to receive hardware. No extra cost will be allowed because of changes or corrections necessary to facilitate the proper installation and operation of the hardware.
3.03 INSTALLATION
A. Install hardware in accordance with manufacturer’s instructions and requirements of ANSI/NFPA 80, and DHI. Use the templates provided by the hardware item manufacturer.
B. Conform to handicap requirements for positioning requirements for the handicapped.
C. Provide architectural finish hardware with all necessary (plus prudent spares) screws, bolts, or other devices or fastenings of suitable size and type to secure the hardware in position for heavy use and long life, harmonizing as to material and finish. Secure all hardware to concrete with expansion sleeve anchors as indicated by best current practice.
All screws normally exposed to view, including all screws for butt hinges, shall have “Phillips” heads, finished to match hardware.
D. Keying
1. Remove construction plugs and install permanent cylinders as required.
2. The master key chart will be provided by the City.
3. The Contractor isresponsible for all keying and permanent keys.
4. Provide construction cylinders and keys as required during construction and rekey permanent locksets as directed by City.
END OF SECTION
PASE – December 2024
270-30-23-22
08710 - 6
Finish Hardware
City of Milpitas
WellUpgrades Program
McCandless Well Facility
(THIS PAGE LEFT BLANK INTENTIONALLY)
PASE – December 2024
270-30-23-22
09290 - 1
Gypsum Board
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 09290
GYPSUM BOARD
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Gypsum wallboard.
1.02 REFERENCED SECTION
A. The following Section is referenced in this Section
1. Section 01330 – Submittals
1.03 SUBMITTALS
A. Comply with Section 01330.
B. Provide manufacturer’s complete product data sheets.
PART 2 - PRODUCTS
2.01 GYPSUM WALLBOARD
A. Gypsum wallboard shall be tapered edge sheets, fire resistant, conforming to ASTM C36, of 5/8-inch thickness unless otherwise shown.
1. The tape, adhesive and reinforcement shall be standard products recommended by the manufacturer of the gypsum wallboard used in the work.
B. Framing components shall conform to ASTM A653, Grade A, G60 galvanized roll formed channel tracks “C” type studs, flanges minimum 1-5/8” wide with rigid attachment to structure.
1. Wire ties to be 18 ga. soft annealed, galvanized. Provide gauge of studs to meet horizontal loads.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Wallboard
1. Except as may be modified by these specifications and by applicable laws and ordinances at the place of building, all work shall be installed to conform to the requirements of ASTM C840.
2. Space fasteners 12 inches on center in the field and eight inches on center staggered along abutting edges and at 12 inches on center for ceilings.
3. Place fasteners no closer than 3/8 inch from ends or edges of wallboard.
4. Apply a three-inch wide uniform coating of adhesive centered over the joint.
5. Center tape over the joint and embed into the adhesive.
6. When dry, sand the joint smooth.
PASE – December 2024
270-30-23-22
09290 - 2
Gypsum Board
City of Milpitas
WellUpgrades Program
McCandless Well Facility
7. Apply two coats of adhesive over the tape, extending each coat slightly beyond the preceding one.
8. Allow each coat to dry and sand smooth.
9. Treat nail dimples in a like manner.
END OF SECTION
West Yost – December 2024
270-30-23-22
09900 - 1
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 09900
COATINGSYSTEMS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Furnishing labor, equipment and material necessary to perform surface preparation and to furnish and apply all paint, protective coatings and finishes as specified herein and/or as indicated on the Plans.
1.02 REFERENCED SECTIONS
A. The following Section is referenced in this Section
1. Section 01330 – Submittals
1.03 QUALITY ASSURANCE
A. Utilize quality assurance procedures and practices to monitor all phases of surface preparation, application and inspection throughout the duration of the project.
Procedures or practices not specifically defined herein may be utilized provided they meet recognized and acceptable professional standards and are approved by the Engineer.
B. Materials furnished and work accomplished under the Contract shall be subject to inspection by the Engineer. The Contractor shall be held strictly to the true intent of the Specifications in regard to quality of materials, workmanship, and diligent execution of the Contract.
C. Work accomplished in the absence of prescribed inspection may be required to be removed and replaced under the proper inspection, and the entire cost of removal and replacement, including the cost of all materials which may be furnished by the City and used in the work thus removed, shall be borne by the Contractor, regardless of whether the work removed isfound to be defective or not. Work covered up without the authority of the Engineer, shall, upon order of the Engineer, be uncovered to the extent required, and the Contractor shall similarly bear the entire cost of accomplishing all the work and furnishing all the materials necessary for the removal of the covering and its subsequent replacement, as directed and approved by the Engineer.
D. Warranty
1. The City will conduct warranty inspection within eleven months following completion and acceptance of all coating work.
2. The City shall establish a date for the inspection and notify the Contractor five (5) days in advance.
3. Any work found to be defective shall be repaired in accordance with the manufacturer'srecommendations, thisspecification and to the satisfaction of the Engineer.
West Yost – December 2024
270-30-23-22
09900 - 2
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
E. Coating Contractor
1. The Coating Contractor shall hold a current painting license and have a minimum five years practical experience in the application of specified products to surfaces at similar facilities.
1.04 REFERENCE PUBLICATIONS
A. This Section references the following documents. They are a part of this Section as specified and modified. In case of conflict between the requirements of this Section and those of the listed documents, the more stringent requirement shall prevail.
1. SSPC – Society for Protective Coatings
2. AWWA – American Water Works Association
3. NSF/ANSI - NSF International
4. Manufacturer’s recommendations
1.05 SUBMITTALS
A. Comply with Section 01330 and submit the following specific information:
1. Manufacturer’s product data sheets.
2. Complete data on each type of paint and primer. This shall be done whether or not the product is named herein.
3. Manufacturer’s published application instructions.
4. Color chart for each paint for color selection by City.
1.06 DELIVERY AND STORAGE
A. Materials shall be delivered to the site in the manufacturer’s sealed containers. Each containershall be labeled by the manufacturer, and the labelshall be intact upon delivery.
Labels shall give the manufacturer’s name, brand, type of paint, batch number, color of paint, date of manufacture, storage life and instructions for reducing. Job mixing or job tinting may be done when approved by the Engineer and for sample colors. No materials shall be delivered that exceed twelve months from the original manufacturing date.
B. Store paint materials and equipment in a storage place protected from weather and excessive heat and cold. Take necessary precautions to reduce hazards to a minimum.
Materials exceeding the storage life recommended by the manufacturershall be removed from the site.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Paint and coating materials furnished for each coating system shall be the products of a single manufacturer. Use only compatible materials in the work. Particular attention shall be directed to compatibility of primers and finish coats.
B. The volatile organic content (VOC) of the applied coatings, as determined in accordance with ASTM D3960, shall comply with prevailing air pollution regulations.
West Yost – December 2024
270-30-23-22
09900 - 3
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. If the specified products are not available in formulationsthat meet applicable regulations on VOC levels at time of application, the Contractor shall submit for review products of equivalent quality and function that comply with regulations in effect at that time.
D. No request for substitution of an “equal” will be considered which decreases the film thickness designated, the number of coats to be applied, solids content by volume, the general type of coating, paint, or primer, or the quantity, quality and type of ingredients in the coatings specified. Paints not listed in the specifications shall be submitted with certified ingredients analysis so that a complete comparison between specified and proposed paint may be made.
2.02 COLORS
A. All colors and shades of colors of all coats of paint shall be as indicated or selected by the City. Each coat shall be of a slightly different shade, to facilitate inspection of surface coverage of each coat. Finish colorsshall be asselected from the manufacturer’sstandard color samples by the City.
B. The Contractor shall submit color chips at least 3-inches by 5-inches in dimension within fifteen (15) days prior to the start of application of the exterior topcoat. The Contractor shall order final coating materials only after receiving written approval from the City Engineer. Failure to obtain the City’s approval prior to ordering shall not be cause for additional compensation.
PART 3 - EXECUTION
3.01 COATINGS SYSTEMS
A. Shop Applied Prime Coat:
1. Except as otherwise specified, prime coats shall be shop applied. Shop applied primer shall be compatible with the specific coating system and shall be applied at the minimum dry film thickness recommended by the manufacturer.
2. Approved submittal data identifying the shop primer used shall be provided to the onsite finish coat applicator and to the Engineer before delivery of items to the jobsite.
3. Damaged coatings, coatings beyond the maximum recoat time, and poorly applied shop coatings that do not meet the requirements of this Section shall be repaired by field coating, which may consist of touching up the shop prime coat and then applying the finish coats to achieve the specified film thickness and continuity.
B. Field Coats:
1. Field coats shall consist of one or more finish coats to build up the coating to the specified dry film thickness. Unless otherwise specified, finish coats shall not be applied until the prime and intermediate coats have been inspected.
3.02 PREPARATION
A. General
1. Surfaces to be coated or painted shall be in the proper condition to receive the material specified before any coating or painting is performed.
West Yost – December 2024
270-30-23-22
09900 - 4
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2. No more abrasive blasting or surface preparation than can be coated or painted in a normal working day will be permitted.
3. Remove sharp edges, burrs and weld spatter.
4. The following levels of surface preparation are subsequently referred to:
a. White Metal Blast Cleaning (SSPC-SP-5): Removal of all visible rust, mill scale, paint, and foreign matter by blast cleaning by wheel or nozzle (dry) using sand, grit, or shot.
b. Near-White Blast Cleaning (SSPC-SP-10): Blast cleaning nearly to white metal cleanliness until at least 95 percent of each element ofsurface area is free of all visible residues.
c. Commercial Blast (SSPC-SP-6): Blast cleaning until at least 67 percent of each element of surface area is free of all visible residues. d. Brush-Off Blast Cleaning (SSPC-SP-7): Blast cleaning of film, rust, loose coatings, and providing a roughened surface for application of a new finish coat.
e. Solvent Cleaning (SSPC-SP-1): Removal of all grease, oil and dirt. 1) Clean cloths and clean fluids shall be used in solvent cleaning. 2) Cleaning and painting shall be scheduled so that dust and spray from the cleaning process will not fall on wet, newly painted surfaces.
3) Hardware, electrical fixtures, grease fittings, name plates, and similar accessories shall be removed or masked during
preparation and paint operations, or shall otherwise be satisfactorily protected.
4) Equipment adjacent to walls shall be disconnected and moved to permit cleaning and painting of equipment and walls and, following painting, shall be replaced and reconnected.
B. Metallic Surfaces
1. Prepare metallic surfaces in accordance with applicable portions of surface preparation specifications of the Steel Structures Painting Council (SSPC) specified in each coating system. The solvent in solvent cleaning operations shall be as recommended by the manufacturer.
C. Detailed Surface Preparation
1. Surface preparations for each type of surface shall be in accordance with the specific requirements of each coating system.
D. Existing Coating Systems
1. Unless otherwise specified, existing or shop applied coating systems damaged by new construction shall be repaired and coated in accordance with the appropriate system specified for new work.
2. Contractor shall demonstrate that the existing coating is compatible with field coating by applying small test patches of specific paints over existing coatings. If the existing coating is not compatible with the field coat (it lifts or ripples), the
West Yost – December 2024
270-30-23-22
09900 - 5
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3.03 APPLICATION
existing coating shall be reprimed with a primer compatible with both the existing coating and the field applied paint, or replaced with the proper prime coat. The primer shall be as recommended by the manufacturer of the field applied paints.
A. Workmanship
1. Each coat of paint shall be of the consistency as supplied by the manufacturer, or thinned if necessary, and applied in accordance with the manufacturer’s written instructions.
2. Each coat shall be well brushed, rolled, or sprayed to obtain a uniform and evenly applied finish. Work shall be free from “runs”, “bridges”, “shiners”, or other imperfections due to faulty intervals. The finish coats shall be uniform in color and finish.
3. Particular care shall be taken to obtain a uniform, unbroken coating over all bolts, threads, nuts, welds, edges and corners.
4. Further, all weld splattershall be removed and all welds neutralized with thinner.
B. Paint Properties, Mixing, and Thinning
1. Paint, when applied, shall provide a satisfactory film and smooth even surface, and glossy undercoats shall be lightly sanded to provide a surface suitable for the proper application and adhesion of subsequent coats.
2. Paints shall be thoroughly stirred, strained, and kept at a uniform consistency during application.
3. Coatings consisting of two or more componentsshall be mixed in accordance with the manufacturer’sinstructions.
4. Where necessary to suit the conditions of the surface, temperature, weather and method of application, the paint may be thinned immediately prior to use by the addition of not more than one pint per gallon of the proper thinner.
5. Unless otherwise specified, paint shall not be reduced more than necessary to obtain the proper application characteristics. Thinner shall be as recommended by the coating manufacturer.
C. Environmental Conditions
1. Paints shall be applied only to surfaces that are dry, and only under such atmospheric conditions as will cause evaporation rather than condensation.
2. Paint shall not be applied during rainy, misty weather, or to surfaces upon which there is frost or moisture condensation. During damp weather, when the temperature of the surface to be coated is within 10°F of the dew point, the surfaces shall be heated to prevent moisture condensation thereon.
3. During painting, and for a period of at least 8 hours after the paint has been applied, the temperature of the surfaces to be painted, the painted surfaces, and the atmosphere in contact shall be maintained at or above 50°F and not less than 10°F above the dew point.
West Yost – December 2024
270-30-23-22
09900 - 6
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. Fans or indirectfired heatersshall be used inside enclosed areas where conditions causing condensation are severe.
5. Paint shall not be applied on surfaces hotter than 120°F.
D. Protection of Coated Surfaces
1. Items which have been coated shall not be handled, worked on, or otherwise disturbed, until the paint is completely dry and hard.
2. After delivery at the site of permanent erection or installation, shop coated metalwork shall be repainted or retouched with specified paint when it is necessary to maintain the integrity of the film.
E. Method of Paint Application
1. Only good, clean brushes and equipment shall be used; and all brushes, buckets, and spraying equipmentshall be cleaned immediately at the end of each painting period.
2. If paint is applied by spray, the air pressure used shall be within the ranges recommended by both the paint and spray equipment manufacturers. Spray painting shall be conducted under controlled conditions, and the Contractor shall be fully responsible for any damage occurring from spray painting.
3. Care shall be exercised not to damage adjacent work during sandblasting operations. Stainlesssteel need not be abrasive blasted. Blasted surfaces shall be coated within 4 hours of being sandblasted. All dust shall be removed from the surfaces prior to painting.
F. Film Thickness and Continuity
1. Coating system thicknessisthe total thickness of primer and finish coats and does not include passivators or sealers.
2. The surface area covered per gallon of paint for varioustypes ofsurfacesshall not exceed those recommended by the manufacturer.
3. The first coat (prime coat) on metal surfaces refers to the first full paint coat and not to conditioning, tie coats, sealers or other pretreatment applications.
4. Coatings shall be applied to the thickness specified, and in accordance with these specifications.
5. Unless otherwise specified, the average total thickness (dry) of any completed protective coating system on exposed metal surfaces shall be not less than 1.25 mils per coat, and the minimum thickness at any point shall not deviate more than 25 percent from the required average.
6. The City may, but is not required to, also measure coating thickness, at random locations, after each coat. SSPC –PA 2 (Level 1) is only to be used for the calibration of dry film thickness gauges. This is a minimum maximum dry film thickness specification. Dry film thickness readings will not be averaged. All inspection equipment shall be supplied by the Contractor. All equipment shall have current calibration certificates. The City reserves the right to use their own equipment at any time.
West Yost – December 2024
270-30-23-22
09900 - 7
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
7. Unless otherwise specified, no less than two coats shall be applied.
G. Special Requirements
1. Hangers and supports shall be coated, except for the final coat, prior to the installation.
2. Except for those to be filled with grout, the underside of ungalvanized equipment bases and supports shall be coated with at least two coats of primer specified for System No. 5 prior to setting the equipment in place.
3. Bolts and bolt holes in flanges (such as those used with couplings or wafer type valves where holes and bolts as finally installed will be exposed to weather or moisture)shall be coated prior to assembly to prevent rusting of the unprotected metals.
H. Cleanup
1. Upon completion of coating, the Contractor shall remove surplus materials, protective coverings, and accumulated rubbish, and thoroughly clean allsurfaces and repair any overspray or other paint related damage.
3.04 SPARE SUPPLIES
A. Provide one new gallon container of each color and type of paint and each type ofsolvent and thinner required by the specifications.
3.05 COATING SYSTEMS
A. The coating systems used for different types of surfaces are listed below and followed by specification for each:
B. System No. 2, Submerged Metal – Potable Water
1. Application:
a. Pump bowl and other surfaces in contact with potable water.
2. Surface Preparation:
a. Near-White Blast Cleaning (SP 10)
3. Material:
a. Polyamide Epoxy
Application Material Cover, MDFTPC
Primer Modified Polyamide Epoxy 4 mils
Intermediate Modified Polyamide Epoxy 4 mils
Finish Modified Polyamide Epoxy 4 mils
4. Standard of Quality:
a. Tnemec Pota-Pox 80, Series 141; or equivalent products.
5. Color:
a. Intermediate coats shall be contrasting colors.
b. Finish coat shall be white.
West Yost – December 2024
270-30-23-22
09900 - 8
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. System No. 5, Exposed Metal – Mildly Corrosive:
1. Application:
a. All exposed metal including pump discharge heads, pipe, valves, supports, and equipment, and other miscellaneous metal surfaces within the Wellsite, except electrical panels and other equipment which may be factory finished coated by the manufacturer.
b. The pump discharge head shall be shipped with a compatible shop applied prime coat and the final coat shall be field applied as specified herein.
c. Where metal is galvanized, pretreat with Paint System 12. d. Where metal is fusion bonded epoxy, solvent clean, and scuff clean with 80 grit sand paper prior to coating application.
2. Surface Preparation:
a. Solvent Cleaning (SP 1) and wire brush cleaning for shop applied primers.
Power tool clean (SP3) for uncoated metal.
3. Material: Modified Epoxy.
a. Converted epoxy containing rust-inhibitive pigments.
Application Material Cover
Primer Polyamide, Epoxy Primer 1 coat, 5 MDFT
Finish Polyamide, Anticorrosive Epoxy 1 coat, 5 MDFT
4. Standard of Quality:
a. Tnemic Chembuild Series 135, Tnemec Epoxoline II, Series V69F; or equal.
5. Color selected by Engineer from color charts.
D. System No. 6, Exposed Metal – Atmospheric
1. Application:
a. Exposed ferrous metal surfaces to be painted with this system include all exposed building doors, gutters, roof hatches, louvers, and downspouts, and metal trim with the exception of the electrical panels, and other equipment which may be factory painted.
b. Where metal is galvanized, pretreat with Paint System No. 12.
2. Surface Preparation:
a. Commercial Blast Cleaning (SP 6)
3. Material:
a. Epoxy Primer / Acrylic Emulsion
Application Material Cover, MDFT
Primer Rust-Inhibitive Primer 3 mils
Intermediate Acrylic Emulsion 2 mils
Finish Acrylic Emulsion 2 mils
West Yost – December 2024
270-30-23-22
09900 - 9
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. Standard of Quality:
a. Tnemec Chembuild Series 135; Enduratone 1029; or equal.
5. Finish Color:
a. Color selected by City from color charts after submital. b. Building trim and equipment shall be contrasting colors.
E. System No. 10, Underground Piping Appurtenances
1. Application:
a. Unless otherwise specified or factory painted with an approved system, buried pipeline items, such as valves, couplings and bolts shall be coated with this system.
2. Surface Preparation:
a. Apply only to clean, dry surfaces. Remove rust, paint and other foreign matter wire brushing or scraping.
3. Material:
a. Tnemec - Two coats of 27WB Black, or equal; 8 mils each coat.
F. System No. 12, Metal – Galvanized, Aluminum, Copper
1. Application:
a. All galvanized metal. Aluminum, copper and brass to be painted shall be pretreated in accordance with this system.
2. Surface Preparation:
a. Solvent cleaned in accordance with SSPC-SP-1, “Solvent Cleaning”.
Aggressively scarify surfaces to produce a profile between 1.0 and 1.5 mils per SSPC/SP 16.
3. Material:
a. Apply one pretreatment coat of Tnemec Series 69, or equal, to a dry film thickness of 2 mil.
b. Next apply the recommended coating or paint for the particular surface to be painted.
G. System No. 102, Masonry – Exterior
1. Application:
a. Seal exterior masonry surfaces, not otherwise painted, with a silicone rubber water repellent. Include a graffiti protectant sealer where shown on the Drawings.
b. Exterior waterproofing for masonry surfaces shall be clear water based formulation specifically designed to penetrate the masonry surface and prevent moisture penetration and is not sensitive to ultraviolet and weather deterioration.
c. The materialshall contain no silicone oils, paraffin waxes or urethanes.
West Yost – December 2024
270-30-23-22
09900 - 10
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
d. Masonry color, texture or vapor transmission qualities shall not be affected by the application of the waterproofing.
2. Surface Preparation:
a. Complete and cure masonry and concrete construction for 30 days or more before starting surface preparation work.
b. Remove oil, grease, dirt, salts or other chemicals, loose materials, or other foreign matter by solvent, detergent washing, or other suitable cleaning methods.
c. Clean surfaces of mortar and grout spillage and othersurface deposits by rinsing with clean water, or brush-off blasting.
3. Material:
a. Apply two coats of clear water repellent sealer at coverage recommended by material manufacturer.
b. Apply two coats of anti-graffiti coating where indicated on the Drawings at coverage recommended by material manufacturer.
c. Acceptable products:
1) Water Repellent sealer: Protectosil Aqua-Trete Concentrate by Evonik, or equal.
2) Anti-Graffiti Coating: Protectosil Antigraffiti by Evonik, or equal.
H. System No. 103 Masonry - Interior
1. Application:
a. All interior masonry surfaces within the chemical, electrical, and control building.
2. Surface Preparation:
a. Complete and cure masonry and concrete construction for 30 days or more before starting surface preparation work.
b. Remove oil, grease, dirt, salts or other chemicals, loose materials, or other foreign matter by solvent, detergent washing, or other suitable cleaning methods.
c. Clean surfaces of mortar and grout spillage and other surface deposits using one of the following:
1) Nonmetallic fiber brushed and commercial muriatic acid followed by rinsing with clean water, or brush-off blasting.
3. Material:
a. Apply one coat Tnemec 130 Block Filler, 75 SFPGPC to all masonry surfaces.
b. Apply two coats of semi-gloss, off-white, Acrylic Emulsion, Enduratone 1029; or equal.
West Yost – December 2024
270-30-23-22
09900 - 11
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
I. System No. 104 Gypsum Wall Board – Interior
1. Application:
a. All interior gypsum wallboard surfaces.
2. Surface Preparation:
a. Remove oil, grease, dirt, dust, or loose materials.
3. Material:
a. Apply one coat of latex primer/sealer, 350 SFPG, and two coats of semigloss, off-white, acrylic latex, 200 SFPGPC.
J. System No. 105 Concrete Sealant System - Interior
1. Application:
a. Interior concrete including floors, pedestals, housekeeping pads, etc.
2. Surface Preparation:
a. In accordance with manufacturer’s written instructions.
3. Material:
a. Kelly-Moore RUST-OLEUM Concrete Saver, 6000 System Epoxy, Color:
Clear (6010) or approved equivalent.
b. Contractor shall determine compatibility of concrete curing compound with this product prior to pouring concrete to ensure that the final coating appearance is uniform.
3.06 SURFACES NOT TO BE PAINTED
A. Unless otherwise specified, the following surfaces shall be left unpainted:
1. Stainless Steel
2. Machined Surfaces
3. Glass
4. Aluminum
END OF SECTION
West Yost – December 2024
270-30-23-22
09900 - 12
Coating Systems
City of Milpitas
WellUpgrades Program
McCandless Well Facility
(THIS PAGE LEFT BLANK INTENTIONALLY)
West Yost – December 2024
270-30-23-22
09960 - 1
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 09960
HIGH PERFORMANCE COATINGS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Materials, surface preparation, application, curing, and inspection for industrial, highperformance coatings on interior and exterior surfaces.
B. Furnish all labor, materials, tools and equipmentrequired to perform surface preparation, coating work, and inspection as specified. Perform all subsidiary and incidental work necessary to complete the work in conformance with the project requirements, to accomplish the approved end result of a totally protected and usable structure, including all attachments, accessories and appurtenances.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section:
1. Section 01330 – Submittals
2. Section 01340 – Request for Information and Clarifications
3. Section 01600 – Material and Equipment
4. Section 01999 – Reference Forms
5. Section 13224 – Pressure Filter
6. Section 15050 – Piping Systems
1.03 DEFINITIONS
A. Abrasive: Material used for blast-cleaning, such as grit.
B. Abrasive Blast Cleaning: Cleaning/surface preparation by abrasive propelled at high speed.
C. Anchor Pattern: Profile or texture of prepared surface(s).
D. Bug Holes: Small cavities, usually not exceeding 15 mm in diameter, resulting from entrapment of air bubbles in the surface of formed concrete during placement and compaction.
E. Coating/Lining Thickness: The total thickness of primer, intermediate and/or finish coats.
F. Dewpoint: Temperature of a given air/water vapor mixture at which condensation starts.
G. Dry Film Thickness (DFT): Depth of cured film, usually expressed in mils (0.001-inch). Use this definition as opposed to existing definition.
H. Drying Time: Time interval between application and curing of material.
I. Dry to Recoat: Time interval between application of material and ability to receive next coat.
J. Dry to Touch: Time interval between application of material and ability to touch lightly without damage.
West Yost – December 2024
270-30-23-22
09960 - 2
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
K. Feather Edging: Reducing the thickness of the edge of paint.
L. Feathering: Operation of tapering off the edge of a point with a comparatively dry brush.
M. Field Coat: The application or the completion of application of the coating system after installation of the surface at the site of the work.
N. Hold Point: A defined point, specified in this Section 09960, at which work shall be halted for inspection.
O. Holiday: A discontinuity, skip, or void in coating or coating system film that exposes the underlying substrate.
P. Honeycomb: Segregated condition of hardened concrete due to non-consolidation.
Q. Incompatibility: Inability of a coating to perform well over another coating because of bleeding, poor bonding, or lifting of old coating; inability of a coating to perform well on a substrate.
R. Laitance: A layer of weak, non-durable concrete containing cement fine that is brought to the surface through bleed water as a result of concrete finishing/overfinishing.
S. Mil: 0.001-inch.
T. Overspray: Dry spray, particularly such paint that failed to strike the intended surface.
U. Pinhole: A small diameter discontinuity in a coating or coating system film that is typically created by outgassing of air from a void in a concrete substrate resulting in exposure of the substrate or a void between coats.
V. Pot Life: Time interval after mixing of components during which the coating can be satisfactorily applied.
W. Resurfacer/Resurfacing Material: A layer of cementitious and/or resin-sed material used to fill or otherwise restore surface continuity to worn or damaged concrete surfaces.
X. Shelf Life: Maximum storage time for which a material may be stored without losing its usefulness.
Y. Shop Coat: One or more coats applied in a shop or plant prior to shipment to the site of the work, where the field or finishing coat is applied.
Z. Spreading Rate: Surface area covered by a unit volume of paint at a specific film thickness.
AA. Stripe Coat: (SSPC Guide 11) A separate coat of paint applied to all weld seems, pits, nuts/bolts/washers, and edges by brush. This coat shall not be applied until any previous coat(s) have cured and, once applied, shall be allowed to cure prior to the application of the subsequent coat(s).
BB. Surface Saturated Dry (SSD): Refers to concrete surface condition where the surface is saturated (damp) without the presence of standing water.
CC. Tie Coat: An intermediate coat used to bond different types of coatings. Coatings used to improve the adhesion of a succeeding coat.
DD. Touch-Up Painting: The application of paint on areas of painted surfaces to repair marks, scratches, and areas where the coating has deteriorated to restore the coating film to an unbroken condition.
West Yost – December 2024
270-30-23-22
09960 - 3
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
EE. Volatile Organic Compound (VOC) Content: The portion of the coating that is a compound of carbon, is photo chemically reactive, and evaporates during drying or curing, expressed in grams per liter (g/l) or pounds per gallon (lb/gal).
FF. Immersion: Refers to a service condition in which the substrate is below the waterline or submerged in water or wastewater at least intermittently if not constantly.
GG. Weld Spatter: (NACE SPO-178)Beads of metal scattered near seam during welding.
HH. Wet Film Thickness (WFT): The primer or coating film’s thickness immediately following application. Wet film thickness is measured in mils or thousandths of an inch (0.001-inch) and is abbreviated WFT.
1.04 REFERENCES
A. ANSI – American National Standards Institute
B. ASTM – American Society for Testing and Materials
C. CSA – Canadian Standards Association
D. IAPMO – International Association of Plumbing and Mechanical Officials E. SSPC – The Society for Protective Coatings
F. NACE International – National Association of Corrosion Engineers International G. NSF International – National Sanitation Foundation International H. UL – Underwriters Laboratories
I. WQA – Water Quality Association
1.05 SUBMITTALS
A. Comply with Section 01330.
B. Finish Schedule
1. Submit a complete Finish Schedule that includes the surfaces in the Finish Schedule herein and any additional surfaces to be coated by the products submitted under this Section 09960. Indicate the specific products and manufacturer for each item (equipment, substrate, or structure) to be coated.
2. Submit a color card or fan deck for each manufacturer and coating product submitted. Items in the complete Finish Schedule shall be confirmed with Cityapproved colors for each location prior to ordering materials.
C. Product Technical Data
1. Product Data Sheets: Submit coating manufacturer’s technical data on products and recommended use. Include the brand name and series number of all coatings to be used. Submit product data sheets for all coating systems that include the following information:
a. VOC data.
b. Storage requirements.
c. Primer type, where required.
d. Maximum dry and wet mil thickness per coat.
West Yost – December 2024
270-30-23-22
09960 - 4
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
e. Minimum and maximum curing time between coats and final cure times, including atmospheric conditions for each.
f. Curing time before submergence in liquid.
g. Thinners/solvents for reduction and cleaning.
h. Ventilation requirements.
i. Minimum and maximum atmospheric and substrate application conditions.
j. Allowable application methods.
k. Maximum allowable moisture content (concrete substrates). l. Maximum shelf life.
2. Material Safety Data Sheets (MSDS): Submit coating manufacturer’s Material Safety Data Sheets (MSDS) for products to be used on the project, including solvents, additives, cleaners, and thinners.
3. Surface Preparation Criteria: Submit coating manufacturer's surface preparation criteria, including recommended surface profile range after abrasive blasting.
4. Application Instructions: Submit Coating manufacturer's application instructions and equipment recommendation.
D. Certifications
1. VOC Content: Submit coating manufacturer’s certification indicating that the submitted coatings meet regulations for allowable VOC content in the place of application and use intended.
2. NSF 61 Certification: Submit NSF 61 certification or listing for products applied to surfaces in contact with process (potable or to be treated to potable) water.
3. Compatibility Confirmation: Submit written confirmation by the shop and field applied coating manufacturers indicating that the compatibility between the shop and field applied coatings have been checked and approved by those manufacturers.
E. Coating Plan/Program
1. Cleaning and Abrasive Blasting Equipment: Submit abrasive blast cleaning and application equipment list and complete procedures for its use.
2. Coating System Treatment and Termination: Submit detailed, written instructions and/or graphic details for coating system treatment and coating system terminations for items to be coated in the project.
3. Overspray and Fugitive Dust Prevention: Submit contractor’s written program for over spray prevention.
4. Recoating Information and Schedule: Submit information that defines the end date for field coating application for all equipment, machinery, and piping to ensure that the maximum recoat time for the shop applied primers will not be exceeded when field applied coatings are installed.
West Yost – December 2024
270-30-23-22
09960 - 5
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
F. References and Qualifications
1. Manufacturer Project References: Submit a minimum of five project references, including current contact name, address, and telephone number where proposed coating products have been successfully used in similar coating applications within the past 5 years.
2. Applicator Project References: Submit a minimum of five project references, including current contact name, address, and telephone number where the Coatings Applicator has successfully performed similar coating work within the past 5 years.
3. Applicator Quality Assurance: Submit a letter from the selected and approved coating manufacturers for the project that verifies that the applicator meets the qualifications and quality assurance requirements in this Section (09960).
4. Inspector Qualifications: Submit Qualifications for Quality Control personnel to be provided on site by the Contractor including, but not limited to, the inspector’s NACE and SSPC Certification numbers for the certifications as requested in this Section (09960).
1.06 QUALITY ASSURANCE
A. Regulatory Requirements
1. All work, materials, procedures, and practices under this Section 09960 shall conform to the requirements of the applicable Federal, State, County, and local regulations and ordinances. The Contractor shall be responsible for securing any and all licenses, certificates, and permits required for the work at no additional cost to the City.
2. Prime and finish coat painting done at the project site or in locations other than the project site shall be in accordance with the air quality regulations in effect at the place the coating is applied.
3. All debris (liquid or solid) generated from surface preparation or coating activities shall be tested and disposed offsite in accordance with applicable Federal, State, County, and local regulations and ordinances. The Contractor shall be responsible for all required testing, monitoring, reporting, licenses, permits, and fees at no additional cost to the City.
B. Unit Responsibility
1. Assign unit responsibility for the materials, surface preparation, and coatings application to the Coatings Application Subcontractor.
2. Provide a certificate of Unit Responsibility. See Section 01999.
C. Materials
1. Contaminated, outdated, diluted materials, and/or materials from previously opened containers shall not be used.
2. Each coating system shall have only one product used for the finish coat to ensure consistency in appearance throughout the project.
West Yost – December 2024
270-30-23-22
09960 - 6
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. Delivery of coating system materials shall be in original, unopened containers with seals unbroken and labels intact. Labelsshall identify type of material, color, and batch number. No material shall exceed six months from the original batch manufacturing date (No exceptions).
4. For repairs, the Contractor shall provide the same products, or products recommended by the coating manufacturer, as used for the original coating.
D. Qualifications
1. Coatings Manufacturer Requirements
a. Minimum of ten (10) years of successful experience manufacturing protective coatings. Submit list of references to demonstrate successful performance on comparable projects.
2. Coatings Applicator Requirements
a. Hold a valid State of California Contractor's Class C 33 Painting and Decorating Contractorslicense for performing abrasive blast cleaning and coating work.
b. Coating applicator must be QP-1 and QP-2 certified by SSPC for coating work relevant to QP-1 and QP-2.
c. Minimum of five (5) years practical experience and successful history in the application of similar products on comparable projects. Submit list of references.
E. Pre-Construction Conference
1. Schedule pre-construction conference with the City.
2. Do not proceed without holding a pre-construction conference with the City, Contractor, Inspector, Fabricator, Coating Applicator and Manufacturer.
3. Topics for discussion include:
a. Site conditions
b. Coating materials and manufacturer's application recommendations. c. Surface preparation prior to abrasive blast cleaning. d. Specification compliance of blast abrasives and surface profile requirements.
e. Schedule of field surface preparation and coating application, and order of the work.
f. List of equipment and procedures for cleaning, blasting, coating application, ventilation and dehumidification (if required). g. Safety programs and the enforcementto be used during the course ofthe work.
h. Weather limitations for acceptable work.
i. Inspection facilities and equipment to be provided.
j. Hold points and inspector’s authority.
West Yost – December 2024
270-30-23-22
09960 - 7
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
k. Establish non-conformance procedures, and chain of command and who signs off on completion of bringing the job back into compliance. l. Procedures for over-spray prevention.
F. Coatings Applicator Personnel
1. Provide a supervisor at the work site during cleaning, surface preparation, and coating operations.
2. Provide skilled personnel qualified to perform work to industry standards of practice and safety, maintain continuity of personnel, and coordinate any transfer of personnel with the City.
G. Quality Control Requirements
1. The Contractor is responsible for ensuring that the surface preparation and coating activities meet the requirements of thisspecification. Observations by the Engineer, or a representative of the coating manufacturer, will not relieve or limit the Contractor’s responsibilities.
2. Coatings application shall conform to requirements of this specification and the referenced standards. Changes in the coating system installation requirements will be allowed only with the written authorization of the Engineer before work commences.
3. The Contractor shall conduct the work and maintain appropriate and measurable quality control activities to ensure that the coating systems are installed as specified. Coating system work that does not conform to the Specifications or is otherwise not acceptable shall be corrected in accordance with the coating manufacturer’s written procedures.
a. Measure all dry film thicknesses. Readings shall be conducted as defined in SSPC-PA2.
b. The City may, but is not required to, also measure coating thickness, at random locations, after each coat. SSPC –PA 2 (Level 1) is only to be used for the calibration of dry film thickness gauges. This is a minimum maximum dry film thickness specification. Dry film thickness readings will not be averaged. All inspection equipment shall be supplied by the Contractor. All equipment shall have current calibration certificates. The City reserves the right to use their own equipment at any time.
4. The Contractor shall prepare and submit coating work daily reports for each day while on site. The coating work daily reports shall be submitted to the Engineer no later than 1:00 p.m. the following workday. The coating work daily reports shall include the following:
a. Number of coating applicator employees on site.
b. Start and finish time of work shift.
c. Climatic conditions at 4-hour intervals(i.e., partly cloudy, airtemperature 78°F, relative humidity 63%, dew point 68°F, and WNW wind @ 4 mph).
West Yost – December 2024
270-30-23-22
09960 - 8
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
d. Major equipment on site regardless of utilization (i.e., trailers, air compressors, generators, spray pumps, scaffolding, aerial lifts, pressure washers, and sandblast pots).
e. Inventory of coatings, solvents and abrasive media stored on site including information relative to deliveries received each day. f. Summary of work performed to include:
1) Substrates/structures prepared (size, quantity, and location). 2) Surface preparation methods including materials consumed and equipment utilized.
3) Substrates/structures coated (size, quantity, and location). 4) Mixing method and time mixed (coating materials).
5) Induction time, pot life, and application start time. 6) Coating application methods including equipment utilized. 7) Application finish time.
8) Coating materials consumed [sequencing, product name, batch number(s) and manufacture date].
9) Problems encountered (i.e., equipment malfunctions or disruption/interference by other trades).
10) Accidents or near misses.
11) Quality control testing results.
H. On-site Inspection
1. The Contractor shall identify the points of access for inspection. The Contractor shall provide ventilation, ingress and egress, and other means necessary for the City’s personnel to safely access the work areas.
2. The specified quality control tasks shall be performed by an individual who has been properly trained and has a minimum of 5 years of experience. The Contractor shall provide the Engineer documentation indicating that the individual designated to perform quality control has received training similar to NACE CIP Level 3, SSPC PCI Level 2, and, has a minimum of 5 yearsfield experience with similar type projects.
3. Acceptance criteria for each Quality Control test shall be as indicated on the manufacturer’s published data or in this specification, whichever is more stringent.
1.07 WARNINGS
A. Application of paint, epoxy, and protective coating materials may be hazardous. Take all necessary precautions to ensure the safety of workers and property.
B. Part of this work requires abrasive blasting. This may require the use of special equipment. Become familiar with the existing site conditions and take allsteps necessary to protect adjacent facilities and personnel, at no additional cost to the City. Abrasive blasting and painting is called for in, on, or around mechanical equipment, which may be damaged by grit, dust, or painting overspray. Mask, wrap, enclose, and provide all protection required to safeguard this equipment at no additional cost to the City.
West Yost – December 2024
270-30-23-22
09960 - 9
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Perform abrasive blasting activities in a manner that will not cause nuisance.
1.08 EXTRA MATERIALS
A. Supply 1 gallon of each color, type, and surface texture. Store where directed.
B. Label each container with color, type, texture, and room locations, in addition to manufacturer's label.
1.09 WARRANTY
A. Provide material and workmanship warranty for coatings of 18 months from date of final acceptance by the City
B. Complete the Extended Warranty Form in Section 01999.
C. See also Paragraph 3.10.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Products identified for each coating system are the product names from specific manufacturers. Coatings products from other manufacturers and of equal or higher quality and performance may also be acceptable.
1. Requestsfor Substitution of Alternative Coatings Products:
a. Include the full name of each product, descriptive literature, test data, data on past performance, manufacturer's instruction for use, generic type, and its nonvolatile content by volume.
b. Demonstrate product and performance is equivalent to the specified materials and complete systems.
c. Demonstrate that the coatings manufacturer has local qualified representation which will provide onsite technical support to resolve field problems with the manufacturer's products, materials or application for the duration of the project.
B. Requestsforsubstitution of alternative coating products that decreasesthe specified dryfilm thickness or the number of coats to be applied, or which changes the generic type of coating specified, will not be considered.
2.02 ABRASIVES FOR BLAST CLEANING
A. Use only new materials that are clean and free of contaminants.
B. Materials must be certified by the California Air Resources Board (CARB) for use in dry, open air abrasive blasting.
C. The Contractorshall use abrasive grit for field blast cleaning conforming to the following:
1. Produce a sharp angular surface profile of 1.5 to 2.5 mils
2. New, clean and free of contaminants (SSPC AB 1), and containing no hazardous materials.
West Yost – December 2024
270-30-23-22
09960 - 10
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
D. Comply with all applicable requirements of Cal/OSHA and the Bay Area Air Quality Management District. Abrasives shall be certified by California Air Resources Board, Executive Order G-565.
E. Purchase only from firms which can accept spent abrasives, then process spent abrasives for recycle or proper disposal.
2.03 COATING SYSTEMS
A. System No. 1 – Zinc-Epoxy-Polyurethane System
1. Surface: Metal.
2. Service: Interior; exterior; exposed to direct sunlight; not immersed.
3. Surface Preparation
a. Shop-Primed Metal
1) Clean shop-primed surfaces in accordance with SSPC SP-2 (Hand Tool Cleaning).
2) Clean damaged shop-coated areas in accordance with SSPC SP-3 (Power Tool Cleaning) and recoat with specified primer. 3) For factory-coated or shop-primed pumps, tanks, and other equipment, delete zinc-rich primer and use compatible primer as recommended by the coating manufacturer. All repair areasshall be abraded and de-glossed and feathered into a smooth
transition.
b. Bare Metal
1) Prepare surface in accordance with SSPC SP-6 (Commercial Blast Cleaning) to 1.5 to 2.5 mil (Thin film systems)surface profile. 2) For ductile iron pipe, prepare surfaces in accordance with NAPF 500-03, NAPF 500-03-04, and NAPF 50.
3) Clean ferrous metal with bleeding in accordance with SSPC SP-11 (Power Tool Cleaning to Bare Metal).
4) Spot blast areas of rust penetration to SSPC SP-10 (Near White Blast) and spot prime with specified primer.
c. Galvanized Metal
1) Clean damaged galvanized steel areas with exposed ferrous metal and/or rust in accordance with SSPC SP-5 (White Metal Blast Cleaning) or SSPC SP-11 (Power Tool Cleaned to Bare Metal) to achieve uniform 1.0 to 1.5 mil profile; spot prime with specified primer.
2) Prepare galvanized, non-ferrous metal in accordance with SSPC SP-16 to impart uniform 1.0 to 1.5 mil profile.
3) For galvanized steel, delete zinc primer.
West Yost – December 2024
270-30-23-22
09960 - 11
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. Primer
a. Field apply one coat of zinc-rich epoxy primer, or polyurethane primer where zinc-rich primer is to be omitted, compatible with urethane finish; comply with written instructions of coating manufacturer. b. Thickness: 3.0 to 4.0 dry mils.
c. Products: Sherwin Williams, Zinc Clad 4100; Carboline, 859; or equal.
5. Intermediate
a. Field apply one coat of intermediate or primer epoxy. b. Thickness: 5.0 to 6.0 dry mils.
c. Product: Sherwin Williams, Macropoxy 646 FC; Carboline, Carboguard 890; or equal.
6. Finish
a. Field apply one coat of polyurethane finish.
b. Thickness: 2.0 to 3.0 dry mils.
c. Product: Sherwin Williams, Hi Solids Polyurethane 250; Carbothane 134VOC; or equal.
B. System No. 2 – NSF Epoxy
1. Surface: Metal.
2. Service: Interior of tanks and other metal components in contact with water.
3. Surface Preparation
a. Shop-Primed Metal
1) Clean shop-primed surfaces in accordance with SSPC SP-2 (Hand Tool Cleaning) or SSPC SP-3 (Power Tool Cleaning).
2) Clean damaged shop-coated areas in accordance with SSPC SP-5 (White Metal Blast Cleaning) and spot prime with specified primer. Cleaning shall produce a surface profile of 2.0 to 2.5 mils. 3) Shop epoxy primed surfaced shall require abrasive blasting or abrading per SSPC-SP 7 prior to receiving finish coats if the maximum recoat limit has been exceeded for the primer. This cleaning shall produce a uniform surface profile of 1.0 to 1.5 mils in the intact primer.
b. Bare Ferrous Metal
1) Prepare surface in accordance with SSPC SP-5 (White Metal Blast Cleaning) to 2.0 to 2.5 mil surface profile.
c. Nonferrous and Galvanized Metal
1) Prepare in accordance with SSPC SP-16 to achieve a uniform 1.0 to 1.5 mil profile.
4. System Thickness: Minimum 10 mils dry film.
West Yost – December 2024
270-30-23-22
09960 - 12
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
5. Primer
a. Field apply one coat of the epoxy primer at the manufacturer’s recommended dry film thickness.
b. Products: Sherwin Williams, Macropoxy 646; Carboline, Carboguard 691; or equal.
6. Finish
a. Field apply one or more coats of the epoxy finish at the manufacturer’s recommended dry film thickness per coat to the specified system thickness.
b. Product: Sherwin Williams, Macropoxy 646; Carboline, Carboguard 691; or equal.
C. System No. 3 – Polyamidoamine Epoxy
1. Surface: Metal.
2. Service: Below grade (buried, exterior) in contact with soil.
3. Surface Preparation
a. Shop-Primed Metal
1) Clean shop-primed surfaces in accordance with SSPC SP-2 (Hand Tool Cleaning) or SSPC SP-3 (Power Tool Cleaning).
2) Clean damaged shop-coated areas in accordance with SSPC SP10 (Near White Metal Blast Cleaning) and spot prime with specified primer. Cleaning shall produce a surface profile of 2.0 to 2.5 mils.
3) Shop epoxy primed surfaced shall require abrasive blasting or abrading per SSPC-SP 7 prior to receiving finish coats if the maximum recoat limit has been exceeded for the primer. This cleaning shall produce a uniform surface profile of 1.0 to 1.5 mils in the intact primer.
b. Bare Ferrous Metal
1) Prepare surface in accordance with SSPC SP-10 (Near White Metal Blast Cleaning) to 2.0 to 2.5 mil surface profile.
4. System Thickness: Minimum 16 mils dry film.
5. Finish
a. Field apply two or more coats at the coating manufacturer’s recommended dry film thickness per coat to the specified system thickness.
b. Product: Sherwin Williams, Macropoxy 646; Carboguard 890; or equal.
D. System No. 4 – Acrylic (Latex)
1. Surface: PVC and CPVC pipe.
2. Service: Exterior; directsunlight exposure.
West Yost – December 2024
270-30-23-22
09960 - 13
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. Surface Preparation
a. Clean plastic pipe with a solvent compatible with the specified primer. b. Sand plastic pipe to uniformly abrade and de-gloss surfaces to achieve a surface profile of 1.0 to 1.5 mils. Vacuum clean after sanding to remove loose dust, plastic particles, and dirt.
4. System Thickness: Minimum 3 mils dry film.
5. Primer
a. Field apply one coat of acrylic primer.
b. Thickness: To the coating manufacturer’s recommended dry film thickness.
c. Product: Sherwin Williams, Extreme Bond; Carboline, Sanitile 120; or equal.
6. Finish
a. Field apply one or more coats at the coating manufacturers recommended dry film thickness per coat to provide the specified system thickness.
b. Thickness: To system thickness.
c. Product: Sherwin Williams, Sher-Cryl HPA; Carboline, Carbocrylic 3359 DTM.
E. System No. 5 – Two component Polycyclamine
1. Surface: Concrete.
2. Service: Interior in chemical containment areas and sumps.
3. Surface Preparation: SSPC/13 surface profile equal to ICRI N0. 6.
4. Primer: International Ceilcote #680 0ne coat @ 5.0 to 10.0 mils DFT, or equal.
5. Finish: International Enviroline #225 40.0 to 60.0 mils DFT, or equal.
6. Color: Off white or gray
7. Other: Holiday test per ASTM D 4787 Finish shall be free of pinholes including visual pinholes, runs, overspray, and even in color and finish.
2.04 FINISH SCHEDULE
A. The following Finish Schedule identifies major structures, equipment, and substrates to be coated in accordance with this Section 09960. The Finish Schedule is not intended to be a complete listing of all surfaces to be coated and other requirements may be identified elsewhere in the Specifications or on the Drawings. There may be additional surfaces for the project that require coating application which may not be listed in the Finish Schedule, and the Contractor shall be responsible for coating those surfaces in accordance with the requirements of this Section 09960.
West Yost – December 2024
270-30-23-22
09960 - 14
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
Structure Substrate
Coating
System Color
Backwash Tank – Interior Ferrous Metal No. 2 Determined by City Backwash Tank – Exterior Ferrous Metal No. 1 Determined by City Filter Vessel – Interior Ferrous Metal See Section
13224
Determined by Manufacturer
Filter Vessel – Exterior Ferrous Metal No. 1 Determined by City Exposed DI and Steel Piping Ferrous Metal No. 1 Determined by City Buried DI and Steel Piping Ferrous Metal No. 3 Determined by Manufacturer Exposed PVC Piping Thermoplastic No. 4 Determined by City Chemical Storage Area – Floors and
Spill Containment Walls
Concrete No. 5 Determined by City
B. The Contractor shall be responsible to identify any surfaces for which there is a question about what standard coating system to apply. about what standard coating system to apply as part of the work covered by this Section 09960 through a Request for Information in accordance with Section 01340.
PART 3 - EXECUTION
3.01 PRODUCT SHIPMENT, PROTECTION, AND STORAGE
A. Comply with Section 01600.
B. Delivery
1. Deliver in original sealed containers identified with labels indicating manufacturer; product name and number; color, batch or lot number, and date of manufacture.
2. Note the date of manufacture and apply coatings prior to the expiration of the guaranteed storage life.
3. Coating materials exceeding storage life will be rejected.
C. Storage
1. Store coating materials in enclosed structures to protect from weather and excessive heat or cold.
2. Coatings stored at above or below manufacturers recommendations will be rejected.
3. Comply with state and local requirements for flammable materials.
3.02 SCAFFOLDING
A. Furnish, maintain, and remove scaffolding, ladders, planks required for application of coatings. Scaffolding, ladders, and rigging shall be designed for their intended use and shall comply with OSHA requirements.
B. Where requested by the City, provide ladders or scaffolding to facilitate inspection of the specified work.
West Yost – December 2024
270-30-23-22
09960 - 15
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3.03 HEALTH AND SAFETY REQUIREMENTS
A. General
1. Comply with the applicable health and safety requirements of OSHA and the recommendations of the product manufacturer.
2. Provide and require the use of proper personal protective and life saving equipment for all persons visiting or working in or about the project site.
B. Ventilation: Ventilate work areasto control potential exposure and hazard to workers and employees of the plant.
1. Furnish and install temporary ventilation system to remove contaminated air, vapors, and other potential hazardous substances from confined spaces and interiors of containmentstructures. Forced air ventilation is required during blast cleaning, abrasive removal, coating application, and curing in confined spaces.
2. Ventilation system equipment shall be explosion proof, of industrial design, and of adequate capacity to reduce the concentration of air contaminants to the degree that a hazard to workers or employees of the plant does not exist. Size ventilation system to maintain air changes within the confined space per OSHA regulations.
C. Illumination
1. Provide spark proof artificial lighting for all work in confined spaces.
2. Equip light bulbs with a protective cage to prevent breakage.
3. For lighting fixtures and bulbs, comply with the requirements of Section 70 of the National Fire Protection Association (NFPA), "National Electric Code", for the applicable atmosphere.
4. For lighting and other electrical systems, provide ground fault type, complying with NFPA 70.
5. Provide the following minimum illumination during all phases of work:
a. General work area: 25-Foot Candles.
b. Surface preparation and coating application: 30-Foot Candles. c. Inspection: 50-Foot Candles per SSPC-Guide 12.
6. As directed by the City, provide additional illumination to fully illuminate all areas to be inspected.
D. Noise
1. Whenever the occupational noise exposure exceeds the maximum allowable sound level as set forth by OSHA regulations, the regional Air Pollution Control District and/or the City of Milpitas, provide and require the use of approved ear protection devices.
2. General maximum sound levelsfor the project are defined asthose which will not affect routine facility or neighborhood activities.
West Yost – December 2024
270-30-23-22
09960 - 16
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. Whenever levels are objectionable, or exceed these limits, adjust operations to reduce noise levels, as directed by the City or the local agency of jurisdiction.
E. Fire Extinguishers
1. Keep a minimum of two (2) ten pound (10-lb) ABC type fire extinguishers present in the work area whenever work is proceeding.
2. Train all personnel in the use of this type of fire extinguisher.
F. Comply with OSHA and applicable regulations and carefully follow the manufacturer's recommendations, precautions, and warnings regarding the handling and use of all surface preparation and coating materials and equipment.
G. Use coating equipment designed for application of the material specified and maintain in good working condition at all times.
3.04 ENVIRONMENTAL CONTROL
A. Carefully contain paints and solvents. Do not allow them to penetrate the soil.
B. Dispose of waste material in a legal manner. All stationary operating equipment shall be placed into secondary containment.
3.05 PREPARATION
A. General
1. Surface preparations for each type of surface shall be in accordance with the specific requirements of each Coating Systems Description. In the event of a conflict the Coating Systems Description shall take precedence.
2. Surfaces to be coated shall be clean and dry. Before applying coating or surface treatments, oil, grease, dirt, rust, loose mill scale, old weathered coatings, and other foreign substances shall be removed. Oil and grease shall be removed before mechanical cleaning is started. Where mechanical cleaning is accomplished by blast cleaning, the abrasive used shall be washed, graded and free of contaminants which might interfere with the adhesion of the coatings. The air used for blast cleaning shall be sufficiently free of oil and moisture to not cause detrimental contamination of the surfaces to be coated.
3. The Contractor shall verify at a minimum of two times daily that air supply is free of oil and moisture contamination (ASTM D-4285). The Contractor shall use effective oil and water separators in all main compressor airlines and shall be placed as close as practicable to the equipment. Prior to using compressed air, the Contractor shall test the quality of air downstream of the separators at suitable outlets by blowing the air on clean white blotter for 2 minutes to check for any contamination, oil, or moisture.
4. Cleaning and coating shall be scheduled so that dust and spray from the cleaning process shall not fall on wet, newly coated surfaces. Hardware, hardware accessories, nameplates, data tags, machined surfaces, sprinkler heads, electrical fixtures, and similar uncoated items which are in contact with coated surfaces shall be removed or masked prior to surface preparation and painting operations.
The Coating Inspector will examine surfaces after abrasive blast cleaning to verify
West Yost – December 2024
270-30-23-22
09960 - 17
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
that all deposits of contaminants have been removed as per surface clean as per ISO 8502 (Class 2). The Contractorshall blow down and vacuum allsurfaces prior to City inspection. Tank floors shall be vacuumed. Following completion of coating, removed items shall be reinstalled. Equipment adjacent to walls shall be disconnected and moved to permit cleaning and painting of equipment and walls and, following painting, shall be replaced and reconnected.
5. Containment: The Contractor shall erect and maintain protective enclosures as required to ensure that surface preparation debris, including dust, is contained within the immediate work area. All costs associated with containment shall be paid by the Contractor.
6. Dust and Contaminants: Protect substrate from excessive dust and airborne contaminants during coating application and curing. Use temporary dust barriers to close off areas being painted from areas where other work is being performed.
B. Abrasive Blast Cleaning
1. When abrasive blast cleaning is required to achieve the specified surface preparation the following requirements for blast cleaning materials and equipment shall be met:
a. Used or spent blast abrasive shall not be reused on this project. b. The compressed air used for blast cleaning shall be filtered and shall contain no condensed water and no oil. Moisture traps shall be cleaned at least once every four hours or more frequently as required to prevent moisture from entering the supply airto the abrasive blasting equipment. c. Oilseparatorsshall be installed just downstream of compressor discharge valves and at the discharge of the blast pot discharges. These shall be checked on the same frequency as the moisture traps as defined in Item 2 above.
d. Regulators, gauges, filters, and separators shall be in use on compressor air lines to blasting nozzles times during this work.
e. An air dryer or desiccant filter drying unit shall be installed which dries the compressed air prior to blast pot connections.
f. The air dryer shall be used and maintained for the duration of surface preparation work.
g. The contractor shall provide ventilation for airborne particulate evacuation (meeting pertinent safety standards) to optimize visibility for both blast cleaning and inspection of the substrate during surface preparation work.
h. If, between final surface preparation work and coating system application, contamination of prepared and cleaned metallic substrates occurs, or if the prepared substrates' appearance darkens or changes color, re-cleaning by water blasting, re-blasting and abrasive blast cleaning shall be required until the specified degree of cleanliness is reclaimed.
i. The contractor is responsible for dust control and for protection of mechanical, electrical, and other equipment adjacent to coatings work.
West Yost – December 2024
270-30-23-22
09960 - 18
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Solvent Cleaning
1. Any solvent wash, solvent wipe, or cleaner used, including but not limited to those used for surface preparation in accordance with SSPC SP-1 Solvent Cleaning shall be of the emulsifying type which emits no more than 340 g/l VOCs for AIM regions, 250 g/l for CARB regions and 100 g/l for SCAQMD regions, contains no phosphates, is biodegradable, removes no zinc, and is compatible with the specified primer.
2. Clean white cloths and clean fluids shall be used in solvent cleaning.
D. Ferrous Metal Substrates
1. Ferrous surfaces shall be prepared in accordance with applicable surface preparation specifications of SSPC/NACE specified for each coating system.
Specific surface preparation requirements are stated in the Coating Systems Description. The profile depth of the surface to be coated shall be in accordance with the Coating Systems Description requirements and shall be measured by Method C of ASTM D4417. Blast particle size shall be selected by the Contractor to produce the specified surface profile. The solvent in solvent cleaning operations shall be as recommended by the coating manufacturer.
2. Preparation of ferrous metal surfaces shall be based upon comparison with SSPCVIS1, and as described in the Coating Systems Description for each coating system. If dry abrasive blast cleaning is selected and to facilitate inspection, the Contractor shall, on the first day of cleaning operations, abrasive blast metal panelsto the standardsspecified. Platesshall measure a minimum of 8-1/2 inches by 11 inches. Panels meeting the requirements of the specifications shall be initialed by the contractor and the City and coated with a clear nonyellowing finish. One of these panels shall be prepared for each type of abrasive blasting and shall be used as the comparison standard throughout the project.
3. Blast cleaning requirements for steel, and ductile-iron, are asfollows:
a. Ferrous steel piping shall be prepared in accordance with SSPC SP-6 and primed before installation.
b. Ductile-iron piping surfaces including fittings shall be prepared in accordance with NAPF 500-03, NAPF 500-03-04, and NAPF 50. c. Remove traces of grit, dust, dirt, rust scale, friable material, loose corrosion products or embedded abrasive from substrate by vacuum cleaning prior to coating application per ISO 8502 (Class 2). . d. Care must be taken to prevent contamination of the surface after blasting from worker’s fingerprints, deleterious substances on workers’ clothing, or from atmospheric conditions.
E. Thermoplastic
1. Prepare surfaces of PVC by sanding to establish uniform surface roughness and to remove glossfrom the substrate. Vacuum clean surfacesto remove loose dust, dirt, and other materials. Next, solvent clean using clean white rags and allow solvent to completely evaporate before application of coating materials.
West Yost – December 2024
270-30-23-22
09960 - 19
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3.06 APPLICATION
A. Workmanship
1. Coated surfaces shall be free from excessive runs, sags, drips, ridges, waves, laps, and brush marks. Coats shall be applied to produce an even film of uniform thickness completely coating corners and crevices. Minor and infrequent runs and sags which are within the total specified DFT plus a few mils – no more than 10% more mils than the specified total DFT shall be acceptable. Frequent runs or sags which exceed these limits or are detrimental to coating system performance are not acceptable.
2. The Contractor's spray equipment shall be designed for application of the materials specified. Compressors shall have suitable traps and filters to remove water and oils from the air. Spray equipment shall be equipped with mechanical agitators, pressure gages, and pressure regulators, and properly sized spray tips.
3. Each coating application be applied evenly and sharply cut to line. Care shall be exercised to avoid overspray or spattering paint on surfaces not to be coated.
Glass, hardware, floors, roofs, and other adjacent areas and installations shall be protected by taping, drop cloths, or other suitable measures.
4. Coating applications method shall be as recommended by the coating manufacturer.
5. Allow each coat to cure or dry thoroughly, according to the coating manufacturer’s printed instructions, prior to recoating.
6. Vary color for each successive coat for coating systems when possible. When coating complex steel shapes, prior to overall coating system application, stripe coat welds, edges of structural steel shapes, metal cutouts, pits in steel surfaces, or rough surfaces with the prime coat. This involves applying a separate coat using brushes or rollers to ensure proper coverage. Stripe coat via spray application is not permitted.
B. Coating Properties – Mixing and Thinning
1. Coatings, when applied,shall provide a satisfactory film and smooth even surface.
Glossy undercoats shall be lightly sanded to provide a surface suitable for the proper application and adhesion of subsequent coats. Coating materials shall be thoroughly stirred,strained, and kept at a uniform consistency during application.
Coatings consisting of two or more componentsshall be mixed in accordance with the coating manufacturer’s instructions. Where necessary to suit the conditions of the surface, temperature, weather and method of application, the coating may be thinned as recommended by the coating manufacturer immediately prior to use. The VOC of the coating as applied shall comply with prevailing air pollution control regulations. Unless otherwise specified, coatings shall not be reduced more than necessary to obtain the proper application characteristics. Thinner shall be as recommended by the coating manufacturer.
2. Mixing of partial “kits” is strictly prohibited unless authorized in writing by the coating manufacturer and the City. This prohibition also applies to coatings
West Yost – December 2024
270-30-23-22
09960 - 20
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
mixed for touchup or repairs. If authorized to mix partial kits, the contractorshall utilize containers with appropriate graduated markings/calibrated weight scales.
C. Environmental Conditions
1. Provide adequate heat, ventilation, and dehumidification to ensure that the coating manufacturer’s environmental requirements are met and to ensure no loss of production days due to failure to meet coating manufacturer’s environmental requirements.
2. Provide sufficient and continuous ventilation and air movement across coated substrates to remove volatile constituents (solvent) throughout the manufacturer’s published curing period.
3. Air and surface temperatures: Prepare surfaces, apply and cure coatings within air and surface temperature range recommended by coating manufacturer.
4. Relative humidity: Prepare surfaces, apply and cure coatings within relative humidity range in accordance with coating manufacturer’s instructions.
5. Dew Point: Do not apply coatings unless the temperature of the dew point is 5°F or greater than the temperature of the substrate.
6. Precipitation: Do not apply coatings in rain, snow, fog, or mist.
7. Wind: Do not spray apply coatings when the wind direction and velocity are such that overspray may result in property damage.
D. Protection of Coated Surfaces
1. Items which have been coated shall not be handled, worked on, or otherwise disturbed, until the coating is completely dry and hard. After delivery at the site, and upon permanent erection or installation, shop-coated metalwork shall be recoated or retouched with specified coating when it is necessary to maintain the integrity of the film.
E. Film Thickness and Continuity
1. WFT of the first coat of the coating system and subsequent coats shall be verified by the contractor, during application of each coat.
2. Coatingsshall be applied to the minimum dry film thickness specified asindicated on the CDS. Dry film thicknessshall be determined using the appropriate industry standard for the substrate (SSPC-PA 2, SSPC-PA 9, or ASTM D1400). Coatings determined to be above the maximum dry film thickness, as indicated herein or on the coating manufacturer’s product data sheet, will be removed at the City’s discretion.
3. The Inspector may, but is not required to, also measure coating thickness, at random locations, after each coat. SSPC –PA 2 (Level 1) is only to be used for the calibration of dry film thickness gauges. This is a minimum maximum dry film thickness specification. Dry film thickness readings will not be averaged. All inspection equipment shall be supplied by the Contractor. All equipment shall have current calibration certificates. The City reserves the right to use their own equipment at any time.
West Yost – December 2024
270-30-23-22
09960 - 21
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. In testing for continuity of coating about welds, projections (such as bolts and nuts), and crevices, the City shall determine the minimum conductivity for smooth areas of like coating where the dry mil thickness has been accepted. This conductivity shall be the minimum required for these rough or irregular areas.
Pinholes and holidays shall be recoated to the required coverage.
5. The ability to obtain specified film thickness is generally compromised when brush or roller application methods are used and, therefore, more coats may be needed to be applied to achieve the specified dry film thickness.
6. For concrete substrates, the Contractor shall apply a complete skim coat of the specified filler-surfacer material over the entire substrate prior to application of the coating system. This material shall be applied such that all open air voids and “bug holes” in the concrete substrate are completely filled prior to coating application.
F. Special Requirements
1. Before erection, the Contractor shall apply all but the final finish coat to interior surfaces of roof plates, roof rafters and supports, pipe hangers, piping in contact with hangers, and contact surfaces which are inaccessible after assembly. The final coat shall be applied after erection. Structural friction connections and high tensile bolts and nuts shall be coated after erection. Areas damaged during erection shall be hand-cleaned or power-tool cleaned and recoated with primer coat prior to the application of subsequent coats. Touch-up of surfaces shall be performed after installation. Surfaces to be coated shall be clean and dry at the time of application. Except for those to be filled with grout, the underside of equipment bases and supportsthat have not been galvanized shall be coated with at least two coats of intermediate coat specified for System 1 prior to setting the equipment in place. Provide coating system terminations at leading edges and transitions to other substrates in accordance with the coating manufacturer’s recommendations or detail drawings.
G. Soluble Salt Contamination of Metal Substrates
1. Contractor shall test in accordance with SSPC Guide 15 metal substrates to be coated that have been exposed to sea water or coastal air or to industrial fallout of particulate or other sources of soluble chlorides (such as waste water exposure). If testing indicates chloride levels in excess of 25 ppm exist after the surface preparation has been completed. The Contractor shall reclean and prepare these surfaces until chloride levels are below 25 ppm.
3.07 EXCLUSIONS
A. Do not prepare or coat the following items or surfaces:
1. Mortar coated pipe and fittings
2. Sacrificial anodes and support wires
3. Copper, brass
4. Name Plates
5. Fiberglass items
West Yost – December 2024
270-30-23-22
09960 - 22
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. Where surfaces specified as "not to be coated" are damaged, coated or otherwise do not comply with these Specifications, clean, repair or otherwise restore such surfaces to the satisfaction of the City, at no additional cost to the City.
3.08 INSPECTION AND TESTING
A. Perform inspection and testing as specified. Include additional inspection, sampling and testing work that the City may require to verify compliance with these Specifications.
B. Notify the City three (3) working daysin advance of any field operations involving abrasive blast cleaning or coating applications.
C. Assistance to City
1. Coordinate work with the inspection, sampling and testing requirements of the City
2. Assist the City as required for the performance of duties.
3. Provide all lighting and scaffolding to enable the City to perform inspection and testing.
4. Provide the level of illumination and scaffolding locations for inspection purposes as directed by the City.
5. Furnish City with safety equipment and devices during abrasive blast cleaning, coating and painting operations. Provide a helmet withcontinuous fresh air supply for observation during cleaning operations and coating application.
D. The City will perform such tests as are required to help ensure compliance with all phases of the surface preparation, and application of the coating systems. Provide test equipment including, but not be limited to the following: SSPC surface preparation standards; surface profile test tape; micrometer; abrasive sieve test; ultraviolet lamp; sling psychrometer; mirror; certified thickness calibration plates; magnetic type dry film thickness gage; and a nondestructive holiday detector.
E. Inspection by the City does not relieve the Contractor of the responsibility of compliance with all the requirements of these specifications.
1. In cases of dispute concerning surface profiles, film thickness, film continuity (holidays), etc., the City’s measurements and tests shall be final. Abide by the City’s decisions and directives.
2. Correct deficiencies in the continuity of the coating, or painting film or in the dry film thickness by applying additional coats as required, at the sole expense of the Contractor.
F. The City will determine the degree and surface profile ofthe field blast cleaned surface per test method NACE RP0287. Perform additional blast cleaning over areas not conforming to the specified degree of surface preparation and surface profile.
G. Perform tests on surfaces of abrasively blast-cleaned steel to detect oil and other contaminants which might be deposited on surfaces as a result of abrasive blasting operations. This may include chemical tests or ultraviolet (black light) tests, as required.
West Yost – December 2024
270-30-23-22
09960 - 23
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
H. Perform all mixing, thinning, application and holiday detection of coatingsin the presence of the City.
I. The City may completely inspect each application of coating to determine thickness and integrity.
1. Each coating application will be checked and deficiencies marked.
2. After observing specified recoat time apply additional coating materials over areas not having the specified minimum dry film thickness and areas having any holidays or pinholes.
3. After correction of deficiencies, the City will re inspect those areas to determine the acceptability of the additional coating.
4. Each coating application must be one hundred (100) percent to the satisfaction of the City prior to proceeding with successive coating applications.
J. Dry Film Thickness Measurement
1. Use an approved magnetic type non destructive dry film thickness gauge.
2. Determine that the specified dry film thickness has been obtained.
3. Measure specified dry film thickness' above the peaks of the surface profile.
4. Perform as many dry film thickness measurements, as described in SSPC–PA2, as required to verify compliance with this specification. Use a Type II Constant Pressure Probe Dry Film Thickness Gauge.
K. Furnish calibrated inspection devices in good working condition for detection of holidays and measurement of dry film thickness.
1. Calibrate and operated per manufacturer's instructions.
2. Furnish U.S. Department of Commerce; National Bureau of Standards certified thickness calibrated plates to test the accuracy of dry film thickness gauges and certified instrumentation to test the accuracy of holiday detectors.
3. Keep dry film thickness gauges and holiday detectors available onsite at all times until final acceptance of the application.
L. City may elect to furnish inspection devices and render decisions based solely upon test results from these devices.
M. For coating film continuity detection tests on interior structure coated surfaces with 20 mils or less dry film thickness, use a nondestructive holiday detector.
1. Provide personnel to operate coating film continuity detection devices under the direction of the City.
2. Operate inspection devices per the manufacture’s recommendations in accordance with NACE SPO188.
West Yost – December 2024
270-30-23-22
09960 - 24
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. Holiday test any tank lining or coatings that are to be used in immersion. The Contractorshall test all coated surfacesfor pinholes(NACE SPO-188) and holidays after application of the final coat in accordance with the following:
a. Perform test in presence of the City Coating Inspector. b. Perform test after coating has cured as recommended by the manufacturer.
c. Use an appropriate detector, such as Elcometer #236 or as approved by the City representative.
N. Test the coating integrity of the interior surfaces below the overflow line.
1. Mark all pinholes and repair manufacturer's written recommendations, or as directed by the City; and then retest.
2. Holidays or other irregularities are not permitted in the completed coating system.
3. During the testing, keep the detecting blade in continuous contact with the coated surface.
4. Do not proceed with holiday detection until the completed coating system has been cured per the manufacturer's recommendations.
O. Upon completion of the epoxy application to the interior structure surfaces, retest for holidays those areas of the lower shell which may have been subjected to abrasive blast rebound from the floor, repaired as noted herein. Repair areas as required and retest.
P. Measure anchor profile for prepared surfaces using a non destructive instrument such as a Testex Press O Film System.
Q. The City will verify completion of the final cure of the interior lining using a solvent wipe test.
1. Solvent wipe test: Consists of rubbing a solvent saturated rag on the area to be tested per ASTM D5402, using solvent recommended by manufacturer.
2. If any coating material isremoved or the surface being tested becomes tacky, the coating is not fully cured. Extend curing time and if required continue dehumidification until the coating is fully cured.
R. The City may suspend the work if the cleaning and coating operations of the Contractor are creating a localized condition detrimental to facility operation, personnel or adjacent property. In the event of an intermittent or emergency suspension of the work by the City, correct deficiencies immediately.
S. Prepare,sign, and submit to the City daily inspection reports.
T. Nonconformance Reports
1. When a nonconformance report is required, prepare, sign, and submit to the City within one working day from the time that it is written.
2. After confirming that all non-conforming work has been corrected and/or the coating work is in compliance with this specification, prepare and submit a conformance verification report shall be completed for the specific item or area.
West Yost – December 2024
270-30-23-22
09960 - 25
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. This report must be signed by the Inspector.
3.09 FINAL CLEANUP
A. Leave all areas in a neat and presentable condition.
B. Remove rubbish, construction debris and waste, surplus construction materials, scaffolding, tools, equipment, and coating, and thinner containers, and excess coating, and thinners, and other objectionable materials.
C. Dispose of such materials away from the site of work and in conformance with all applicable codes, ordinances and regulations.
D. Remove coating spots upon adjacent surfaces.
E. Clean, repair or refinish all damage to surfaces resulting from the work.
3.10 WARRANTY INSPECTION
A. Conduct a warranty inspection of all coating and painting work between the period of eleventh (11th) month through eighteenth (18th) month following final acceptance of the Contract work.
B. The City will establish the date for the inspection and will notify the Contractor atleast 30 days in advance. The City may, by written notice to the Contractor, reschedule the warranty inspection to another date within the eleventh through eighteenth month inspection period, or may cancel the warranty period altogether.
C. Attendance
1. Attend the warranty inspection.
2. Notifying directly involved parties of the date and time of the inspection.
3. The City suggests personnel present at the pre-construction conference be present at this inspection.
D. Preparation
1. The City will completely drain and hose clean sufficiently for inspection.
2. Provide (Contractor)suitable lighting, ventilation and scaffolding for the structure inspection.
3. Use SSPC – Guide 12 for Illumination, and provide a minimum of 200 candle foot illumination for inspection.
E. Inspect visually the entire interior and exterior coating systemsto determine whether any repair work is necessary or if a more detailed inspection will be needed.
F. Inspection Report
1. The City will prepare and deliver to the Contractor an Inspection Report. a. The report will cover the warranty inspection, setting forth the number and types of failures observed, the percentage of the surface area where
West Yost – December 2024
270-30-23-22
09960 - 26
High Performance Coatings
City of Milpitas
WellUpgrades Program
McCandless Well Facility
failure has occurred, and the names of the persons making the inspections.
b. Color photographs illustrating each type of failure will be included in the report.
c. A coating system failure is defined as any location where coatings have peeled off, bubbled, or cracked, and any location where rusting is evident. d. Upon completion of inspection and receipt of Inspection Report, the City will establish a date for the Contractor to proceed with remedial work.
G. Commence repairs on the date established by the City and completed within one month (thirty days).
1. Repair all coating system failures.
a. Remove the deteriorated coating, clean the surface and recoat with the same coating system in strict accordance with the specification and manufacturer'srecommendations,to the satisfaction of the City. b. If the area of failure exceeds twenty five (25) percent of the area of a portion of the structures surface, then remove the entire coating system and recoat that surface. All costs for warranty inspection are the responsibility of the Contractor. Additional inspection and all costs for repair are the responsibility of the Contractor.
H. If the Contractor fails to complete the remedial work to the satisfaction of the City, the City may elect to perform the remedial work. The Contractor is liable for actual cost of all such remedial work, plus 20% for City’s administrative cost.
I. Perform final cleanup in accordance with this Section.
END OF SECTION
West Yost – December 2024
270-30-23-22
10200 - 1
Safety and Signage
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 10200
SAFETY AND SIGNAGE
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Informational and accident prevention signs.
B. Fire extinguishers.
C. Fire and security entry key lock box.
1.02 REFERENCED SECTIONS
A. The following Section is referenced in this Section
1. Section 01330 – Submittals
1.03 SUBMITTALS
A. Comply with Section 01330.
B. Product Data: Fully describe all items proposed for use.
C. Shop Drawings: Scaled drawings or photostats of custom-made signs, showing style and size of lettering and colors.
D. Samples: Manufacturer’sstandard color palette for selection.
1.04 QUALITY ASSURANCE
A. Regulatory Compliance
1. American with Disabilities Act (ADA)
2. California Building Code (CBC), Title 24, especially Chapters 11A, 11C and 11D
3. California Code of Regulations (CCR), Title 8, CAL/OSHA
4. Code of Federal Regulations (CFR), Title 29, Chapter XVII, Part 1910 a. Subpart E, Section 1910.37
b. Subpart J, Section 1910.145
5. Uniform Fire Code, with local amendments
6. National Fire Protection Association (NFPA)
B. Standards
1. Conform to American National Standards Institute (ANSI) Z535.
PART 2 - PRODUCTS
2.01 SIGNS
A. Emergency Eyewash and Shower Location Signs
1. Manufacturers: Seton; Brady; or equal.
2. Size: 10-inch H x 14-inch W
West Yost – December 2024
270-30-23-22
10200 - 2
Safety and Signage
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. Sign Characteristics: Meet ANSI Z535 sign format for safety signs; signal word - white text on green background; text – black text on white background; safety symbol – green on white background.
4. Material: Aluminum.
5. Provide holes and ties for mounting sign to the emergency shower and eyewash station standpipe.
6. Schedule of Signs Required:
Quantity Text Location
1 EMERGENCY
Safety Shower & Eyewash Station
At emergency shower and
eyewash station
B. Fire Equipment Location Signs
1. Manufacturers: Seton; Brady; or equal.
2. Size: 4-inch W x 18-inch H
3. Sign Characteristics: Bright, fade-resistant red on white downward facing directional arrow on red field.
4. Material: Vinyl with adhesive back.
5. Schedule of Signs Required:
Quantity Text Location
One (1) for each fire
extinguisher
FIRE EXTINGUISHER On the wall above or next to
each fire extinguisher
C. Caution Signs
1. Manufacturers: Seton; Brady; or equal.
2. Size: 14-inch W x 10-inch H.
3. Sign Characteristics: Conform to OSHA 1910.145(d)(4).
4. Material: Aluminum.
5. Provide eyelet holes at each corner for mounting.
6. Schedule of Signs Required:
Quantity Text Location
3 CAUTION
THIS EQUIPMENT
STARTS AUTOMATICALLY
Well Pump; Surface Wash
Pump; and Filter
5 CAUTION
NON-POTABLE WATER
DO NOT DRINK
(7-inch H x 10-inch W)
At lab sink, at each utility
station, and at each hose bib
West Yost – December 2024
270-30-23-22
10200 - 3
Safety and Signage
City of Milpitas
WellUpgrades Program
McCandless Well Facility
D. Danger Signs
1. Manufacturers: Seton; Brady; or equal.
2. Size: 14-inch W x 10-inch H, unless noted otherwise.
3. Sign Characteristics: Conform to OSHA 1910.145(d)(2).
4. Material: Aluminum.
5. Provide eyelet holes at each corner for mounting.
6. Schedule of Signs Required:
Quantity Text Location
4 DANGER
HIGH VOLTAGE
At Switchgear and Motor
Control Centers
E. Informational Signs
1. Manufacturers: Seton; Brady; or equal.
2. Size: 14-inch W x 10-inch H, unless noted otherwise.
3. Sign Characteristics: Conform to ANSI Z535 Standards.
4. Material: Aluminum.
5. Provide eyelet holes at each corner for mounting.
6. Schedule of Signs Required:
Quantity Text Location
1 NOTICE
ELECTRICAL ROOM On Electrical Room door
1 NOTICE
CHEMICAL ROOM On Chemical Room door
2 NOTICE
AUTHORIZED PERSONNEL ONLY At each entrance gate
2 WARNING
IT IS A FEDERAL OFFENSE TO TAMPER WITH
THIS FACILITY. VIOLATORS WILL BE
PROSECUTED PER HR 3448.
At each entrance gate
F. NFPA Fire Hazards of Materials Signs
1. Manufacturers: Seton; Brady; or equal.
2. Sign Characteristics: 4-color background – blue, red, yellow, white; 7-1/2-inch by 7-1/2-inch; 3-inch black hazard numerals scheduled below; conform to NFPA No. 704, standard System for Identification of Hazards of Materials for Emergency Response.
3. Material: Semi-rigid plastic with adhesive back.
West Yost – December 2024
270-30-23-22
10200 - 4
Safety and Signage
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. Schedule of Signs Required:
Quantity Material Health Flammability Reactivity Symbol 1 Ammonium Sulfate 0 0 0 --
1 Ferric Chloride 2 0 1 --
1 Sodium Hypochlorite 3 0 0 OX
G. Chemical Signs
1. Manufacturers: Seton; Brady; or equal.
2. Sign Characteristics: Red text on white background. Text shall include chemical name, precautionary measures, signal word, statement of hazards, and antidote.
Sign shall include NFPA No. 704, Standard System for the Identification of the Hazards of Materials for Emergency Response.
3. Material: Semi-rigid plastic with adhesive back.
4. Provide eyelet holes at each corner for mounting. Provide 3/4-inch-thick AB marine grade plywood backing,sealed edges, painted for mounting on CMU wall.
5. Schedule of Signs Required:
Quantity Material
1 Ammonium Sulfate
1 Ferric Chloride
1 Sodium Hypochlorite
2.02 FIRE EXTINGUISHERS
A. Provide fire extinguishers as required by applicable codes and ordinances.
B. Fire extinguishers shall be 40-pound minimum, BC dry chemical type, with UL rating of 4A: 40BC.
C. Include mounting bracket for each fire extinguisher mounted on masonry wall.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Signs
1. Install signs where directed by the Engineer.
2. Install signs after painting surfaces to receive signs.
3. Use fasteners as follow:
a. To concrete and masonry: 4.25-inch diameter expansion anchors. b. To sheet metal (28 to 6 gauge): #10 sheet metal screws. c. To dry wall: Adhesive backing tape.
d. To chain link fence: Wire ties at each corner.
e. To plywood backing boards: #10 wood screws.
West Yost – December 2024
270-30-23-22
10200 - 5
Safety and Signage
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. To machinery: Fasteners as suitable. Where surface is unavailable for mounting sign, provide a permanent galvanized steel sign post set in concrete for mounting sign.
5. Follow manufacturer’s written installation instructions.
6. Securely mount signs level, plumb, and true to plane positions.
B. Fire Extinguishers
1. Install in accordance with all applicable codes and ordinancesincluding NFPA-10.
END OF SECTION
West Yost – December 2024
270-30-23-22
10200 - 6
Safety and Signage
City of Milpitas
WellUpgrades Program
McCandless Well Facility
(THIS PAGE LEFT BLANK INTENTIONALLY)
West Yost – December 2024
270-30-23-22
10520 - 1
Fire Protection
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 10520
FIRE PROTECTION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Surface mounted wall bracket
B. Hand portable fire extinguishers
C. All attachments and accessories necessary to provide a complete installation
1.02 REFERENCED SECTIONS
A. The following Section is referenced in this section
1. Section 01330 – Submittals
1.03 SUBMITTALS
A. Comply with Section 01330.
B. Product Data: Material specifications, manufacturer's installation, and maintenance instructions.
1.04 PRODUCT HANDLING
A. Protection
1. Cabinets and extinguishersto be stored at the job site in a safe, dry place with all labels intact and legible at time of installation.
2. Use all means to protect fire protection equipment before, during, and after installation.
B. Replacements
1. In the event of damage, including water intrusion, immediately make all repairs and replacements necessary to the approval of the City and at no additional cost to the City.
1.05 QUALITY ASSURANCE
A. Comply with
1. All pertinent codes and regulations
2. Comply with the 2022 California Fire Code, Chapter 9, Section 906 for Ordinary Hazard locations.
3. Mounting Height: Comply with the 2022 California Building Code, Chapter 11-B for access requirements.
B. Manufacturer as approved by NFPA and State Fire Marshal.
C. Work to be performed only by workers thoroughly skilled and specially trained in the techniques of installing fire extinguishers and cabinets, and who are completely familiar with the published recommendations of the manufacturer of the material being used.
West Yost – December 2024
270-30-23-22
10520 - 2
Fire Protection
City of Milpitas
WellUpgrades Program
McCandless Well Facility
1.06 OPERATION AND MAINTENANCE MANUALS
A. Provide test, refill and recharge schedules, procedures and recertification requirements.
PART 2 - PRODUCTS
2.01 FIRE EXTINGUISHERS
A. Fire extinguishers for new building shall be from one manufacturer.
B. Manufacturer:
1. General #TCP-5LH, 2A-10B:C,
2. Amenex #500, 2A-10B:C,
3. Or approved equal
C. Wall brackets: Manufacturer’s standard metal bracket. Fasteners shall be expansion anchors, concrete screws or adhesive anchors.
PART 3 - EXECUTION
3.01 SURFACE CONDITIONS
A. Coordination
1. Coordinate with all other trades as required to ensure proper and adequate installation of brackets in the locations shown.
B. Inspection
1. Verify, before installation of signs, that surfaces are ready to receive fire extinguishers.
3.02 INSTALLATION
A. Install fire extinguishing devices in full accordance with pertinent regulations and the manufacturer’srecommendations.
B. Install extinguishers in locations indicated on the plans and in accordance with the California Fire Code.
C. Wall bracketsshall be installed in concrete andmasonry using expansion, concrete screws or adhesive anchors.
END OF SECTION
West Yost – December 2024
270-30-23-22
11000 - 1
General Requirementsfor Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 11000
GENERAL REQUIREMENTS FOR EQUIPMENT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. General requirements applicable to mechanical equipment and systems.
B. Ensure mechanical equipment meets the requirements of this Section in addition to the specific requirements of the individual equipment specification Sections.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 01610 – Seismic Anchorage and Bracing
3. Section 01782 – Operation and Maintenance Information
4. Section 01825 – Equipment and System Testing
5. Section 01999 – Reference Forms
6. Section 09960 – High Performance Coatings
7. Section 10200 – Safety and Signage
8. Section 15110 – Valves and Appurtenances
9. Section 16940 – Instrumentation
1.03 GENERAL REQUIREMENTS
A. Equipment shall be of new construction and comply with the following requirements:
1. Designed for all stresses that may occur during fabrication, transportation, erection, and during continuous or intermittent operations.
2. Adequately anchored, leveled, aligned, and ready for operation without binding or overloading of critical components or motors.
3. Installed with necessary appurtenances required for proper operation and installation in a neat and workmanlike manner.
4. Tested by factory trained service mechanics or engineers.
1.04 UNIT RESPONSIBILITY
A. Equipment systems shall be assembled as a unit by a single manufacturer responsible for the entire unit.
1. Responsibility extends to selecting components of the system to assure compatibility, proper operation, and compliance with specified performance requirements.
2. Unit responsibility does not relieve Contractor of responsibility to City for performance of the Work.
West Yost – December 2024
270-30-23-22
11000 - 2
General Requirementsfor Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
1.05 QUALITY ASSURANCE
A. Arrangement
1. The arrangement of equipment shown on the Drawings is based upon information available at the time of design and is not intended to show exact dimensions peculiar to a specific manufacturer.
2. Some features of the illustrated equipment installation may require revision to meet actual equipment installation requirements.
3. Structural supports, foundations, connected piping, and valves shown may have to be altered to accommodate the equipment provided. Additional payment will not be made for such revisions and alterations.
B. Balance: Fully assemble all rotating elements in motors, pumps, blowers and centrifugal compressors before performing static and dynamic balance. Where specified, submit balancing reports, demonstrating compliance with this requirement.
1.06 SUBMITTALS
A. Comply with Section 01330.
B. General: Provide separate submittals for each equipment item or group of related equipment items.
C. Equipment Anchorage: Submit anchor bolt sizing calculations.
D. Bearing Life Calculations: Submit bearing L-10 life calculationsin accordance with AFBMA requirements.
1.07 OPERATION AND MAINTENANCE MANUALS
A. Furnish operation and maintenance manuals for each equipment system in accordance with the Section 01782 requirements.
1.08 PROTECTION DURING SHIPMENT
A. Shipping: Ship equipment in sealed, weather-tight, enclosed conveyances, and protected against damaging stresses during transport and handling.
B. Bearing Housings: Wrap or otherwise seal to prevent contamination by grit and dirt, and tape closed ventilation and other types of openings.
C. Repair any damaged materialsto conform to the requirements of the Contract before the assembly is incorporated into the Work. The Contractor shall bear the costs arising out of dismantling, inspection, repair, and reassembly.
PART 2 - PRODUCTS
2.01 PIPING CONNECTIONS ON EQUIPMENT
A. Flanges on Equipment: Conform to dimensions and drilling specified in ANSI B16.1, Class 125 unless otherwise required by Division 15 pipe specifications or the Drawings.
B. Pipe Flanges: Conform to dimensions and drilling specified in AWWA C207, Class D, 125 lb flanges provided on connection pipe.
C. Threaded Flanges: Flat faced with standard taper pipe thread conforming to ANSI B1.20.1.
West Yost – December 2024
270-30-23-22
11000 - 3
General Requirementsfor Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
D. Pipe Threads: Conform in dimension and limits of size to ANSI B1.1, coarse thread series, Class 2 fit.
E. Flange Assembly Bolts and Nuts
1. Heavy pattern, hexagonal head, carbon steel machine bolts with heavy pattern, hot pressed, hexagonal nuts conforming to ANSI B18.2.1 and B18.2.2.
2. Threads: Unified Screw Threads, Standard Coarse Thread Series, Class 2A and 2B, ANSI B1.1.
2.02 BEARINGS
A. Service: Unless otherwise specified, equipment bearings shall be oil or grease lubricated, ball or roller type, designed to withstand the stresses of the service specified.
B. Rating
1. L-10 Rating Life: Minimum 50,000 hours unless otherwise specified. Determine rating life using the maximum equipment operating speed.
2. Determine rating in accordance with the latest revisions of AFBMA Methods of Evaluating Load Ratings of Ball and Roller Bearings.
3. Where individual equipment Sections specify higher bearing life ratings, those requirements supersede the minimum bearing life specified above.
C. Grease Lubricated Bearings
1. Fit with easily accessible grease supply, flush, drain and relief fittings, except those bearings specified to be factory sealed and lubricated.
2. Extend non-accessible grease fittings to an easily accessible location using 1/4- inch diameter stainless steel tubing as an extension tube.
3. Grease supply fittings: Standard hydraulic Alemite or Zerk type.
D. Oil Lubricated Bearings
1. Equip with either a pressure lubricating system or a separate oil reservoir type system.
2. Size oil lubrication systems to safely absorb the heat energy normally generated in the bearing under a maximum ambient temperature of 60°C.
3. Equip with a filler pipe and an external level indicator gage.
E. Incorporate bearing housings with sufficient cooling to maintain surface temperature at 65 degrees C or less for continuous operation at bearing rated load and a 50 degrees C ambient temperature, or install appropriate shielding on bearings that are accessible to touch.
F. Bearing Isolators
1. Provide for bearing where the shaft exits the bearing housing.
2. Motor Bearings: Provide Inpro/Sealstyle VBX vapor blocking isolators.
3. Gears: Provide Inpro/Seal “Double Runner” bearing isolator for shafts exiting the gear casing.
West Yost – December 2024
270-30-23-22
11000 - 4
General Requirementsfor Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. Pumps, Blowers and Compressors: Provide Inpro/Sealstyle VBX blocking bearing isolators where shafts exit casings/housings.
5. Pillow Block Bearings: Provide Inpro/Seal “Pop-In” style bearing isolators.
2.03 DRIVE COMPONENTS
A. V-Belt Drives
1. Design with sliding base or other suitable tension adjustment.
2. Design with service factor of at least 1.6 at maximum speed.
3. Statically balance sheaves. In addition, dynamically balance sheaves that will operate at peripheral speed of more than 5,500 feet per minute.
4. Belts: Provide anti-static belts when explosion-proof equipment or environment is specified.
B. Gear Reducers
1. Provide drives with nominal input horsepower rating equal to or greater than the nameplate horsepower of the drive motor.
2. Provide gear drives manufactured in accordance with AGMA Class II service requirements.
2.04 SHAFT COUPLINGS
A. Type and Rating: Non-lubricated, designed for a minimum of 50,000 hours operating life.
B. Equipment with a driver greater than 1/2 horsepower, and where the input shaft of a driven unit is directly connected to the output shaft of the driver, shall have its two shafts connected by a flexible coupling which can accommodate angular misalignment, parallel misalignment and end float, and which cushions shock loads and dampens torsional vibrations.
C. Provide couplings recommended by the coupling manufacturer for the specific application, considering horsepower, speed of rotation, and type of service.
D. Install couplings in conformance to the manufacturer'sinstructions.
2.05 GUARDS AND CAUTION SIGNS
A. Guards
1. Enclose exposed moving parts with guardsthat meet the requirements of federal and state OSHA requirements.
2. Enclose drive shafts to at least 7 feet above floors or operating platforms.
B. Materials
1. Fabricate guards of 14 gauge steel and expanded metal screen to provide visual inspection of moving parts without removal of the guard.
2. Galvanize after fabrication and paint with the equipment.
3. Fasteners: Type 304 stainless steel.
West Yost – December 2024
270-30-23-22
11000 - 5
General Requirementsfor Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Warning Sign
1. Provide warning signs near equipment with moving parts that operate automatically or by remote control.
2. Provide warning signs with wording, size and colors specified in Section 10020.
2.06 PRESSURE TAPS, GAUGES, AND SWITCHES
A. Pressure Taps and Gauges: Unless otherwise indicated, provide on the discharge and suction sides of pumps, blowers, and compressors.
B. Pressure Gauges: See Section 15110.
C. Pressure Switches: Unless otherwise indicated, provide on the discharge side of pumps.
See Section 16940 for pressure switch specifications.
2.07 NAMEPLATES AND LIFTING EYES
A. Nameplates
1. Provide on each item of equipment with the specified equipment name or abbreviation and equipment number.
2. Engrave or stamp (not painted) on stainless steel and fastened to the equipment in an accessible location with stainless steel screws or drive pins.
B. Lifting Eyes
1. Provide on equipment weighing over 80 lbs.
2.08 SPARE PARTS AND LUBRICANTS
A. Spare Parts: Provide for each item of mechanical, electrical, and instrumentation equipment a supply of spare parts and special tools required for the starting, testing, adjustments, and initial operation. Pack spare parts required by individual equipment specifications:
1. Pack spare parts with individual weights less than 50 pounds in a heavily constructed painted wood box with hinged cover and a locking clasp.
2. Provide a typed inventory of spare parts stapled to the underside of the cover.
3. Tag and wrap each part in a waterproof container. Spare bearings shall be encapsulated in an airtight plastic film.
B. Lubricants: Provide for each item of mechanical equipment of the type recommended by the equipment manufacturer a supply of the lubricant for startup, testing, and initial operation.
1. Provide a list showing the required lubricants for each item of mechanical equipment. List estimated quantity of lubricant needed for a full year's operation, assuming the equipment will operate continuously.
2. Lubricants shall be products of the City's current lubricant supplier.
3. Limit the various types of lubricants by consolidating them, with the equipment manufacturer's approval, into the least number of different types.
2.09 ANCHOR BOLTS
A. Size anchor bolts and concrete anchors for equipment in accordance with Section 01610.
West Yost – December 2024
270-30-23-22
11000 - 6
General Requirementsfor Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2.10 FACTORY APPLIED COATINGS
A. Ship each item of equipment to the site of the work with a shop applied prime coating prepared in accordance with the requirements of Section 09960 and compatible with the finish coatings.
B. Finish Painting of Motors: Factory-apply finish coats using manufacturer's standard coating, unless otherwise specified in Section 09960.
2.11 SPECIAL TOOLS AND ACCESSORIES
A. Furnish with each piece of equipment all tools, instruments, or accessories of a special nature that are required to assemble, disassemble, maintain, or repair any item of equipment.
1. Tag and mark each piece indicating their service and the piece of equipment for which their use is intended.
2. Include a list and description or pictorial representation of all special tools required for a given piece of equipment for insertion into the equipment operation and maintenance manual.
2.12 FASTENERS AND DIELECTRIC ISOLATION
A. Fastenersfor Aluminum: Stainless steel.
B. Isolate steel surfaces, other than stainless steel, from aluminum with stainless steel, neoprene, non-metallic washers or other acceptable material.
C. Dissimilar Metals: Protect from galvanic corrosion by means of pressure tapes, coatings, or isolators.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install, align and test each item of equipment within the tolerancesrecommended by the equipment manufacturer.
B. When specified in individual Sections, install and test equipment under the direction of installation engineers who have been factory trained by the equipment manufacturer.
C. Perform all work in accordance with manufacturer's recommendations.
3.02 QUALITY CONTROL
A. Test equipment in accordance with Section 01825 and the individual equipment Sections.
B. Furnish written certification from the equipment manufacturers that each item has been installed, aligned, and tested correctly and that the installation meets the manufacturer's requirements for efficient, trouble-free operation. Utilize Manufacturer’s Installation Certification Form provided in Section 01999.
C. Equipment manufacturer’s certification shall not be construed asrelieving the Contractor of his overall responsibility for this portion of the work.
END OF SECTION
PASE – December 2024
270-30-23-22
11002 - 1
Equipment Mounting
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 11002
EQUIPMENT MOUNTING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Equipment mounting requirements, including fabricated steel equipment bases, concrete equipment pads, supports, anchorage, and accessories.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 01611 – Seismic Design Requirements
3. Section 05501 – Anchor Bolts
4. Section 09900 – Coating Systems
1.03 QUALITY ASSURANCE
A. Provide supports, anchorage, and equipment mountsthat are sized and designed to resist the calculated forces and that are in accordance with the manufacturer’s recommendations, the current California Building Code (CBC), and industry standards requirements.
1.04 DESIGN REQUIREMENTS
A. Design equipment mounts and anchorages to resist the minimum lateral force required by Section 01611 and the latest edition of the CBC.
B. Equipment anchor bolt sizes shown on the Drawings are the minimum required size.
C. Equipment anchorage design and calculations shall be prepared and signed by a civil or structural engineer currently registered in the state where equipment is installed.
1.05 MOUNTING REQUIREMENTS
A. Mount equipment and driver on a common fabricated steel baseplate with ample rigidity to support equipment and maintain shaft alignment without excessive deflection.
B. Mount equipment baseplates on concrete equipment pads.
1.06 SUBMITTALS
A. Comply with Section 01330.
B. Shop Drawings: Provide drawings of equipment bases and anchorage details.
C. Anchorage Calculations: Submit stamped and signed anchor bolt sizing calculations.
PART 2 - PRODUCTS
2.01 ANCHOR BOLTS AND CONCRETE ANCHORS
A. Provide anchor bolts and concrete anchors in accordance with Section 05501.
PASE – December 2024
270-30-23-22
11002 - 2
Equipment Mounting
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2.02 CONCRETE EQUIPMENT PADS
A. Construct concrete pedestals at least 6 inches wider and longer than the steel or cast base so that the distance between the anchor bolts and the edge of concrete is at least 3 inches.
B. Unless otherwise shown orspecified, all conduits, piping connections, drains, etc.shall be enclosed by the concrete base.
C. Shape concrete pedestals to drain away from the base.
D. Allow concrete to cure 21 days or until the concrete has cured to 75 percent of its specified compressive strength before placing equipment on the concrete pedestal.
E. Do not start equipment placed on the concrete pedestal until the concrete has cured for 28 days or to 100 percent of its specified compressive strength.
2.03 STRUCTURAL STEEL EQUIPMENT BASES
A. Provide structuralsteel bases with thickened steel pads for doweling.
1. Fabricate equipment base using continuous welds to seal seams and contact edges between steel members.
2. Grind welds smooth.
B. Design equipment bases with perimeter steel beams, intermediate stiffeners and baseplate.
1. Provide perimeter steel beams with minimum depth equal to 1/10th of the longest dimension of the base.
2. Beam depth need not exceed 14 inches provided that the baseplate deflection is kept within acceptable limits to minimize misalignment, as determined by the manufacturer.
C. Provide grout holes for the bases of equipment where vibration isolation is not specified.
D. Provide minimum 1-inch thick steel mounting baseplate for equipment with drivers 20 horsepower and larger.
E. Shop-apply prime coat prepared in accordance with the requirements of Section 09900 and compatible with the finish coatings
PART 3 - EXECUTION
3.01 GENERAL
A. Connect piping to equipment with flexible connections and/or expansion joints such that the intended uses of these joints is maintained in the piping system.
B. Coordinate the location of electrical conduit and piping penetrations within the concrete pad and equipment base.
1. Stub-up penetrations on the same side of the equipment as required for connection to the equipment.
2. Locate equipment drains for proper drainage away from equipment.
PASE – December 2024
270-30-23-22
11002 - 3
Equipment Mounting
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3.02 EQUIPMENT MOUNTING
A. Mount equipment on equipment baseplates using stainlesssteelshimsso that equipment and driver are level in both directions and mounted within machined areas on baseplate.
Do not use wedges to obtain level and alignment.
B. Utilize templates for placement of anchor bolts prior to placing concrete for equipment pad.
C. Apply a non-seize or non-galling compound on the threads of anchor bolts and concrete anchors.
3.03 SHAFT ALIGNMENT
A. After the complete unit has been installed on the equipment pad and leveled, check the factory shaft alignment by disassembling coupling and measuring angular and parallel orientations.
B. Use reverse-indicator dial or laser type alignment equipment to align shafts to within the manufacturer’s required tolerance. Allow for thermal expansion, spacer coupling length and other factors that affect proper shaft alignment.
3.04 GROUTING EQUIPMENT BASES
A. After alignment has been completed, tighten anchor bolts and grout between equipment base and equipment pad. Use non-shrink and non-ferrous grout no lessthan 7/8 inch and no more than 1-5/8 inches thick unless otherwise shown.
B. Allow 48 hours for grout to harden and then remove jacking screws. Re-check torque on anchor bolts and re-check shaft alignment, making corrections as necessary.
END OF SECTION
PASE – December 2024
270-30-23-22
11002 - 4
Equipment Mounting
City of Milpitas
WellUpgrades Program
McCandless Well Facility
(THIS PAGE LEFT BLANK INTENTIONALLY)
West Yost – December 2024
270-30-23-22
11060 - 1
Electric Motors
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 11060
ELECTRIC MOTORS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Low-voltage alternating current induction motors, 250 horsepower or less.
B. This section does not specify medium voltage (over 600 volts) motors and specialty motors such as submersible motors, hoist motors, valve operator motors or torque rated motors.
C. Unless specified otherwise, require electric motors to be provided by the manufacturer of the driven equipment per Section 11000.
D. Unless specified otherwise in the particular equipment specifications, comply with these specifications.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 01600 – Material and Equipment
3. Section 01782 – Operation and Maintenance Information
4. Section 01999 – Referenced Forms
5. Section 11000 – General Requirements for Equipment
1.03 QUALITY ASSURANCE
A. Unit Responsibility
1. Comply with Section 11000.
2. Unless otherwise specified, assign unit responsibility for motors to the individual manufacturers of the driven equipment.
B. Product Delivery, Storage, and Handling
1. Comply with Section 01600.
C. Basic Standards
1. Manufacture per UL 674, UL 1004, NEMA Standard MG 1, and the requirements specified.
1.04 ENVIRONMENTAL CONDITIONS
A. Refer to individual equipment sections and drawings for installation locations.
1.05 SUBMITTALS
A. Comply with Section 01330.
West Yost – December 2024
270-30-23-22
11060 - 2
Electric Motors
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. Include a copy of the contract document control diagrams and process and instrumentation diagrams, with addenda updates, that apply to the equipment in this section.
1. Mark to show specific changes necessary for the equipment proposed in the submittal.
2. If no changes are required, mark the drawing or drawings “No Changes Required”.
3. Failure to comply with this paragraph is sufficient cause to reject the entire submittal.
C. Include the following items:
1. Completed Motor Data Form (Section 01999).
2. For motors 100 horsepower and larger, a motor heating curve.
3. Motor outline, dimensions, and weight.
4. Manufacturer's descriptive information relative to motor features.
5. Where a winding over-temperature device is required, provide a response curve for the temperature device.
6. For all inverter duty motors, the motor manufacturer's certification that the motor is compatible with the adjustable frequency drive to be used with the motor as specified in this section.
7. Motor performance data showing motor full load current, efficiency, and power factor for the motor operating at 25, 50, 75, 100 and 125 percent of full load.
8. Operating and maintenance information specified in Section 01782.
9. Overhaul instructions for each motor 5 horsepower and above.
1.06 DESIGN REQUIREMENTS
A. NEMA “B” design, unless otherwise specified.
B. NEMA Class B temperature rise above 40 degrees C ambient.
1.07 WARRANTY
A. Provide two-year warranty from date of substantial completion unless manufacturer’s standard warranty is longer.
B. Complete the Extended Warranty Form in Section 01999.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. General
1. The City and City believe the following candidate manufacturers are capable of producing equipment and/or products that will satisfy the requirements of this section.
West Yost – December 2024
270-30-23-22
11060 - 3
Electric Motors
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2. Do not construe the preceding statement, as an endorsement of a particular manufacturer’s products or that named manufacturers’ standard equipment or products will comply with the requirements of this section.
3. The below listed manufacturer's motors generally meet the class and performance requirements of this specification when furnished with appropriate modifications and additional features as specified.
B. Horizontal Motors
1. Types 1 and 2 – Premium efficiency motors manufactured by General Electric Inc., Type KS; and Reliance Electric Co., Type XEX, or equal.
2. Type 3 – Premium efficiency explosionproof motors manufactured by General Electric Inc., Type KS, ClassI, Group D; and Emerson US Motor, Type LCE, or equal.
C. Vertical Motors
1. Types 1 and 2 – Premium efficiency motors manufactured by General Electric Inc., Type KS; and Emerson US Motors, Type TUCE Corroduty, or equal.
2. Type 3 – Premium efficiency explosionproof motors manufactured by General Electric Inc., Type KS, Class I, Group D; and Emerson US Motors, Type LUCE, or equal.
D. Inverter Duty Motors
1. Baldor, Inverter Motor; General Electric, ASD; Reliance, RPM-AC (XT) and US Motors Varidyne Inverter Duty, or equal.
2.02 MATERIALS
A. Cast iron frames for motors 1/2 horsepower and larger. Steel frames for motors smaller than 1/2 horsepower. Aluminum frame motors will not be permitted.
B. Cast metal fan blades and shrouds.
C. Stainless steel hardware.
D. Nonhygroscopic leads.
2.03 NAMEPLATES
A. Material: Engraved or stamped stainless steel or brass.
B. Information: Include items listed in NEMA Standard MG 1, Paragraph 10.37, 10.38 or
20.60, as applicable.
C. For motors 1/2 horsepower and larger, indicate the ABMA L-10 rated life for the motor bearings.
D. For motors 2 horsepower and larger, list the nominal efficiency.
E. For explosionproof motors, indicate UL frame temperature limit code.
F. Permanently fasten to the motor frame and position for easy visible inspection.
West Yost – December 2024
270-30-23-22
11060 - 4
Electric Motors
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2.04 MOTORS LESS THAN 1/2 HORSEPOWER
A. General
1. Type: Squirrel cage, single phase, capacitorstart, induction run type.
2. The equipment manufacturer may provide normally supplied materials in lieu of those specified in Paragraph 2.02
3. For single phase motors provide Class B insulation.
4. Small fan motors may be split-phase or shaded-pole type.
5. Provide with copper windings.
B. Rating
1. 115 volts, single phase, 60 hertz.
2. Continuous-time rated per NEMA Standard MG 1, Paragraph 10.35.
3. Nonoverloading at all points of the equipment operation.
C. Enclosures
1. Comply with NEMA MG 1.
2. Unless otherwise specified, provide totally enclosed fan cooled or totally enclosed nonventilated enclosures.
3. Explosion Proof Motors
a. Furnish with UL Label for ClassI, Division 1, Group D hazardouslocations. b. Provide an over temperature device in the enclosure to detect and automatically de-energize the motor if the enclosure surface temperature exceeds 260 degrees C.
c. Mark nameplate with UL frame temperature limit code T2B.
2.05 MOTORS 1/2 HORSEPOWER THROUGH 250 HORSEPOWER
A. General
1. Type: Three phase, squirrel cage, full voltage start induction type.
2. Unless otherwise specified, provide a NEMA MG 1-1.16 design for the duty service imposed by the driven equipment such as frequent starting, intermittent overload, high inertia, mounting configuration, or service environment.
B. Rating
1. 460 volts, three phase, 60 Hz.
2. Continuoustime rated per NEMA Standard MG 1, paragraph 10.40.
3. Unlessspecified otherwise, provide a service factor of 1.15, butsize not to exceed the nameplate rating at any point on the operating curve (non-overloading) of the driven equipment.
West Yost – December 2024
270-30-23-22
11060 - 5
Electric Motors
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Classifications
1. General:
a. Comply with the requirements specified in the following paragraphs. b. Definition of terms: Per NEMA MG 1.
c. Temperature rise: for all motor types, do not exceed that permitted by Note II, paragraph 12.42, NEMA MG 1. The insulation shall be nonhygroscopic.
2. Type 1 Motors:
a. Drip-proof guarded enclosures
b. Class F insulation and Class B temperature rise at the motor's nominal rating.
3. Type 2 Motors:
a. Totally enclosed, fan cooled.
b. Class F insulation and Class B temperature rise at the motor's nominal rating.
c. Conform to IEEE 841.
d. Coat all internalsurfaces with an epoxy paint.
4. Type 3 Motors
a. Explosion proof motors, UL listed per UL 674 for Class I, Group D hazardous atmospheres.
b. Class F insulation.
c. Conform to IEEE 841.
d. Provide UL-approved breather/drain device in the motor drain hole. e. Provide a frame temperature thermostat which meets the UL frame temperature limit code T2B (260 degrees C). Include automatically reset, normally closed contact rated 2 amperes at 115 volts AC.
D. Thermal Protection
1. Unless specified otherwise, provide thermal protection as defined in NEMA MG 1-12.53.1, as follows:
Motor type
Thermal Protection
Type 2 - Thermostats Type 1 - RTDs
Noninverter duty 50-150 HP 200-250 HP
Inverter duty 1-60 HP 75-250 HP
2. Provide thermal protection in each stator winding.
a. Thermostats: Bimetallic switch type, self-resetting. b. Resistance temperature detectors (RTDs): 10-ohm copper type (two per phase).
c. On larger frame sizes where the motor manufacturer does not offer copper type RTDs, provide 100-ohm platinum type (two per phase).
West Yost – December 2024
270-30-23-22
11060 - 6
Electric Motors
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. For explosion proof motors, provide the motor winding thermal protection as specified above in addition to the motor frame thermostat specified in Paragraph
2.05.c.4.e.
E. Inverter Duty Motors
1. Use with adjustable frequency controllers employing Pulse Width Modulation (PWM) technology.
2. Do not exceed NEMA MG 1, Class B, temperature rise when operating over the specified speed range on the specified load speed/torque characteristicsrequired by the associated driven equipment
3. Provide certification from the motor manufacturer of compatibility with the adjustable frequency controller to be used with the motor.
4. Designed to operate over the speed or frequency range specified.
5. Insulation: Meet NEMA MG 1, Part 31 (1600 volt peak at a minimum of 0.1 microsecond rise time).
6. Provide with thermal protection asspecified above.
7. Provide Grounding Unit
a. Provide with a shaft grounding unit mounted on the fan housing with stub shaft extended from the motor shaft.
b. Equip with two brushes, totally enclosed and sealed against environmental contamination.
c. Exception: Grounding unit and brushes not required for vertical turbine pumps.
8. Totally Enclosed, Air-Over, Blower-Cooled (TEBC) Type a. Provide where specified or required by the specified application requirements.
b. Blowers: Driven at constant speed by 460-volt, 3-phase motors meeting Type 2 requirements specified in Paragraph 2.04 C.3.
c. Manufacture blower and ducting as an integral part of the main motor frame.
d. Provide air intake filter.
e. Constructscroll case of cast aluminum or iron, and fan wheel of Type 304 stainless steel.
9. Inverter duty motors may be NEMA MG1-1.16, design A.
F. Vertical Motors
1. Provide solid-shaft P-base type specifically designed for vertical installation.
2. Universal position motors are not acceptable.
3. Comply with Type 2, Type 3, and/or Inverter Duty Motor requirements as specified.
West Yost – December 2024
270-30-23-22
11060 - 7
Electric Motors
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. Thrust bearing rating: Demonstrate compatibility with the loads imposed by the driven equipment.
G. Minimum Nameplate Efficiency
1. Determine per IEEE 112B testing procedures, when operating on a sinusoidal power source.
2. Comply with the following:
Motor
Horsepower
Motor Minimum Efficiency, percent
900 rpm 1200 rpm 1800 rpm 3600 rpm
1 72.0 82.5 83.0 84.0
1.5 75.5 84.0 85.0 84.0
2 81.5 85.5 82.5 82.5
3 86.5 88.5 89.5 87.5
5 87.5 89.5 89.5 89.1
7.5 88.5 91.0 91.7 90.2
10 89.5 91.1 91.7 91.0
15 89.8 91.7 92.4 91.7
20 90.2 91.7 93.0 91.7
25 91.0 92.4 93.5 92.0
30 91.0 93.0 93.6 92.4
40 91.7 93.6 94.1 93.0
50 92.4 93.6 94.1 93.0
60 93.0 93.9 94.5 93.6
75 93.0 94.5 95.0 94.1
100 93.6 94.5 95.4 94.5
125 94.5 94.5 95.4 94.9
150 94.5 95.4 95.8 95.0
200 94.5 95.4 95.8 95.4
250 94.5 95.4 95.8 95.4
H. Conduit Boxes
1. Type: Cast iron,split construction with threaded hubs.
2. Conform to IEEE 841.
3. Furnish at least one size larger than NEMA standard for the given motor size.
Review Conduit and Wire Routing schedule and coordinate with Electrical Contractor for conduit and cable requirements.
4. Design to rotate in order to permit installation in any of four positions 90 degrees apart.
West Yost – December 2024
270-30-23-22
11060 - 8
Electric Motors
City of Milpitas
WellUpgrades Program
McCandless Well Facility
5. Furnish with petroleum-resistant gaskets at the base of the conduit box and between the halves of the conduit box.
6. Provide grounding lug located within the box for the ground connection.
7. Minimum length of pigtail leads:
a. 12 inches for motors up to 50 horsepower.
b. 16 inches for motors larger than 50 to 250 horsepower.
I. Bearings
1. Type: Oil or grease lubricated ball or angle contact roller bearings.
2. Rating: Minimum L-10 life of 100,000 hours per ABMA 9 or 11 at the ambient temperature specified.
3. Motor designs employing cartridge type bearings will not be accepted.
4. Fit with lubricant fill and drain or relief fittings.
J. Lifting Eyes
1. Fit motors weighing more than 50 pounds with at least one lifting eye.
K. Current Imbalance
1. Base upon the lowest value measured.
2. Do not exceed the values tabulated below when the motor is operating at any load within its service factor rating and is supplied by a balanced voltage system:
a. Under 5 horsepower: 25 percent
b. 5 horsepower and above: 10 percent
L. Space Heaters
1. Where specified, size and design to prevent condensation inside the motor enclosure after shutdown.
2. Type: Cartridge or flexible wraparound type.
3. Power Requirements: 120 volts, single phase, 60 Hz.
4. Mark the rating in watts and volts on the motor nameplate or on a second nameplate.
5. Bring terminals to a separate terminal block or to pigtails in the conduit box.
PART 3 - EXECUTION
3.01 TESTING
A. Perform winding insulation resistance and current imbalance testing as specified in Division 16.
B. Test for correct rotation during preoperational checkout.
END OF SECTION
West Yost – December 2024
270-30-23-22
11342 - 1
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 11342
SUBMERSIBLE WELL PUMP
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Product-lubricated submersible turbine pump, complete with electric motors, discharge elbow and all accessories and appurtenances as specified or shown on the Drawings and including all labor, superintendence, materials, power, water, tools, equipment and services required by the Contract Documents or required to complete the Work.
B. Designed for pumping well water.
C. All materials in contact with well water shall be lead-free and meet the requirements of California Code of Regulations Title 22 Chapter 16 Article 7 regarding direct and indirect additives.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 01782 – Operation and Maintenance Information
3. Section 01820 – Training
4. Section 01825 – Equipment and System Testing
5. Section 01999 – Reference Forms
6. Section 05501 – Anchor Bolts and Anchoring Devices
7. Section 11000 – General Requirements for Equipment
8. Section 11060 – Electric Motors
1.03 QUALITY ASSURANCE
A. General
1. All components of the pumping unit must be supplied by and warranted by the pump manufacturer including bowls, impellers, column, shafting, discharge heads, couplings, seals, suction barrels (if applicable) and motors.
B. Unit Responsibility
1. Assign unit responsibility, as specified in Section 11000, to the pump equipment manufacturer for the equipment specified in this Section and other referenced sections.
2. Submit a certificate of Unit Responsibility (Section 01999).
C. ISO 9001 Quality System
1. Comply with ISO 9001 Quality System
2. Submit documentation of compliance prepared by independent certification agency approved by International Organization for Standardization.
West Yost – December 2024
270-30-23-22
11342 - 2
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. Do notship equipment before compliance documentation has been reviewed and approved.
D. Governing Standards
1. Conform to the applicable requirements of AWWA E-102 – Submersible Vertical Turbine Pumps, latest edition.
2. Conform to the applicable requirements of ANSI/HI 9.6.4, Rotodynamic Pumps for Vibration Analysis and Allowable Values, latest edition.
3. Testing: Conform to ANSI/HI 14.6 Rotodynamic Pumpsfor Hydraulic Performance Acceptance Tests, latest edition, Level 1U
E. Manufacturer:
1. Shall have supplied complete units that have been in successful operation, at similar installations, for at least ten (10) years.
2. Provide products of a single manufacturer who has been regularly engaged in the design and manufacture of the equipment.
F. Variable Frequency Drive Coordination
1. Contractor to verify that proposed pump and VFD are compatible.
1.04 DESIGN AND PERFORMANCE REQUIREMENTS
A. Install, test and adjust pumping equipment under the supervision of the manufacturer's representative. All costs for such supervision shall be paid for by the Contractor and included in the bid.
B. Bowl diameter shall allow for installation in the well casing as constructed.
1. Well casing at pump setting is nominal: 16-inches in diameter
2. Maximum bowl diameter: 12 inches
3. Minimum annular clearance between pump bowl and casing wall: 1 inch C. The horsepower rating of the motorsshall be sufficient to coverthe fullrange of the pump curve from zero discharge to free discharge without motor overload.
D. Rotating mechanical equipmentshall not exhibit criticalspeeds within the specified range of operating speeds. Critical speedsfor the assembly of the pump/pump station unit shall be at least 20% greater than maximum operating speed or at least 20% below the minimum speed.
E. Design pumps to operate:
1. Continuously under the specified conditions without damage to pump or motor.
2. In a stable fashion and without cavitation over the full range of operating conditions.
3. With head/capacity curves which slope continuously with no flat areas or slope reversals which could cause operating problems in variable frequency drive applications.
4. At shutoff head for durations up to 30 seconds without overloading or damage.
West Yost – December 2024
270-30-23-22
11342 - 3
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
5. Without encroaching on the motor’s service factor at any point on the pump’s speed/capacity curve.
F. Design the pumping unit to safely operate free of resonant frequency. Conform to the vibration requirements of ANSI/HI 9.6.4.
G. Comply with the following.
Design Requirements
Number of Pumps 1
Minimum Pump Column Diameter, inches 8
Minimum Discharge Diameter, inches 6
H. Design pumpsfor long-term operation under the following environmental conditions:
Environmental Conditions
Equipment Location In Well
Pumped Fluid Clear Water
Pumped Fluid Temperature 35-65 °F
Duty Continuous
Suction Bowl Submergence 250 feet minimum
Site Elevation 41 feet
Well Artesian Pressure 19 psi
I. Performance Criteria
1. Comply with the following:
a. The specified head includes static lift, distribution system pressure and friction headloss in piping external to the pump.
b. Specified head does not include velocity head or hydraulic losses internal to the pump. The pump manufacturershall calculate these losses and add them to the total head specified herein giving total dynamic head.
Performance Requirements
Nominal pump speed, rpm: 3540
Condition A(a)
Capacity, gpm 400
Total head, feet 422
Min. Efficiency, % 70
Condition B(b)
Capacity, gpm 200
Total head, feet 520
West Yost – December 2024
270-30-23-22
11342 - 4
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
Performance Requirements
Condition C(c)
Total Head, feet 600
(a) Condition A: The rated, continuous-duty operating performance, guaranteed in accordance with Hydraulic Institute Acceptance Level 1U. (b) Condition B is provided to indicate the general shape of the pump curve. (c) Condition C is Shut Off Head.
2. Select pumps such that the primary design point (Condition A) is greater than 95 % of the pump best efficiency point flow, and less than 105% of the pump best efficiency point flow.
1.05 SUBMITTALS
A. Comply with Section 01330.
B. Include a copy of the contract document control diagrams and process and instrumentation diagrams, with addenda updates, that apply to the equipment in this Section.
1. Mark to show specific changes necessary for the equipment proposed in the submittal.
2. If no changes are required, mark the drawing or drawings “No Changes Required”.
3. Failure to comply with this paragraph is sufficient cause to reject the entire submittal.
C. Include the following items
1. Complete scope of supply indicating all componentsto be furnished.
2. Materials of construction
3. Performance data curves showing head, capacity, horsepower demand, NPSH required, recommended NPSH margin, and pump efficiency over the entire operating range of the pump.
a. Indicate separately:
1) The minimum submergence required at the rated flow condition and at the maximum and minimum flow conditions.
2) Head
3) Capacity
4) Horsepower demand
5) Pump efficiency
6) Manufacturer’s recommended maximum and minimum flow
conditions
b. Submit performance curves at intervals of 100 rpm from minimum speed to maximum speed for each pump equipped with a variable speed drive.
4. Fully dimensioned assembly and installation drawings including shaft size, seal, coupling, bearings, anchor bolt plan, part nomenclature, material list, outline dimensions, and shipping weights.
West Yost – December 2024
270-30-23-22
11342 - 5
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
5. On shop drawings or elsewhere indicate:
a. Pump model and size
b. Design rotation speed
c. Number of stages
d. Type of bowl bearings
e. Type of line shaft bearings
f. Shaft size
g. Pump column size
h. Discharge size
i. Outside diameter of pump bowls
6. Vibration analysis stamped and signed by a licensed professional engineer demonstrating that the critical speeds of the discharge head assembly and of the shaft are either 20 percent above the maximum speed, or 20 percent below the minimum speed.
7. Anchor bolt design calculations and details signed by a California-registered Civil or Structural Engineer, and additional anchorage information specified in Section 05501.
8. Electric motor information specified in Paragraph 2.05 of this section.
9. Submit a Motor Data Form (Section 01999)
10. Wiring diagram
11. Coating information
12. ISO 9001 Certification
13. Documentation that all materials in contact with the potable water, well water to be treated to potable water, or liquids (e.g., chemicals) to be added to the process/potable water shall be lead-free and shall meet the requirements of California Code of Regulations Title 22 Chapter 16 Article 7 regarding direct and indirect additives.
14. Unit Responsibility Form (Section 01999)
15. Manufacturer’sstandard warranty
D. Deferred Submittals:
1. Submit operating and maintenance (O&M) information as specified in Section 01782 a minimum of 10 days before equipment shipment.
2. Submit factory test reports as specified under “Source Quality Control” a minimum of 10 days prior to equipment shipment and receive approval prior to equipment shipment. Include factory test reports in final O&M manual.
3. Submit forms required following startup and training. Include forms in final O&M manual. Refer to Part 3 below.
4. Submit Manufacturer’sInstallation Certification Form (Section 01999).
West Yost – December 2024
270-30-23-22
11342 - 6
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. One of the following:
1. Weir-Floway Inc.
2. Goulds
3. Flowserve
4. National Pump Company
5. or equal as specified in Section 01330
B. Modify as necessary to meet the requirements of thissection.
2.02 PUMP CONSTRUCTION
A. Shaft diameter: Not less than the minimum permitted by AWWA E102 for the applicable driver nameplate horsepower rating.
B. Shaftsshall have a first criticalspeed not lessthan 20% above maximum operating speed.
C. Excessive vibration shall be sufficient cause for rejection of the equipment.
D. The mass of the unit and its distribution shall be such that resonance at normal operating speeds is avoided.
E. All rotating partsshall be accurately machined and shall be in as nearly perfect rotational balance as practicable.
F. Provide type 316 stainlesssteel nuts and bolts on entire pumping unit.
2.03 MATERIALS OF CONSTRUCTION
A. Pump Bowls: Cast-Iron, ASTM A48, Class 30, or 316 stainless steel B. Impellers: Zincless bronze, Alloy 936, or 316 stainlesssteel C. Pump Shaft: Stainless Steel, Type 416 or 431, ASTM 582 D. Pump Motor Couplings: ASTM A276, 416 Stainless Steel E. Column Pipe: ASTM A53, Grade B, Schedule 40 Steel Pipe with ANSI B1.20.1 standard tapered pipe threads
F. Column Pipe Couplings: ASTM A108 steel, Grade 1020
G. Suction Strainer: Stainless Steel, AISI Type 316
H. Anchor Bolts: ASTM A276 Type 316 Stainless Steel
I. All Hardware and Fasteners: Type 316 Stainless Steel J. Discharge Elbow: Fabricated Steel
2.04 EQUIPMENT FEATURES
A. Bowl Assembly:
West Yost – December 2024
270-30-23-22
11342 - 7
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
1. Each bowl assembly shall consist of the bowl, impeller and bowl shaft, and bearings.
a. Bearings shall be located above and below the impeller. b. Bowls shall be free from blow holes, sand holes, and all other faults; accurately machined and fitted to close dimensional tolerance. c. For cast iron bowl assemblies only, passages through the bowl shall be polished and porcelain-lined.
d. The inner surfaces of the inlet shall be smooth and free of sharp projections or cavities that might cause turbulence or cavitation.
2. Impellers shall be constructed free from projections, cavities, or abrupt transitions.
a. Impeller surfaces shall be polished, accurately machined and finished, and mechanically and dynamically balanced.
b. The impellersshall be statically and dynamically balanced. c. One piece, free of cracks and porosity. Each impeller free of sharp projections, cavities, or abrupt transitions that could incite cavitation or excessive turbulence.
3. The impellers shall be of the enclosed type and shall be of heavy construction, accurately fitted, statically and dynamically balanced.
4. The bowl shaft shall be supported by bearings located on both sides of each impeller.
5. Construct such that the reed critical frequency of the discharge head and motor assembly is a minimum of 20% above the maximum pump speed, or 20% below the minimum pump speed.
6. Provide a stainlesssteel nameplate attached to the discharge head containing the following information at a minimum:
a. Pump model number
b. Design flow
c. Design head
d. Horsepower
e. Speed
f. Number of stages
g. Serial number
2.05 MOTORS
A. The motorshall be designed for continuous operation while completely submerged.
B. Motors shall be rated 460 volts, three phase, 60 Hz, and shall be continuous time rated in accordance with NEMA Standard MG 1, paragraph 10.40. Unless specified otherwise, motors shall have a service factor of 1.15, but shall not be required to exceed their nameplate rating at any point on the operating curve (non-overloading) of the driven equipment. Motor shall be compatible with variable frequency drive (VFD) operations.
West Yost – December 2024
270-30-23-22
11342 - 8
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Winding insulation resistance and current imbalance testing shall be performed. If the motor is not shop tested with the pump, certified motor efficiency data shall be furnished to the pump supplier based on tests conducted on the motor or an identical motor.
D. Motor nameplatesshall be engraved orstamped stainlesssteel or brass. Information shall include those items enumerated in NEMA Standard MG 1, paragraph 10.37, 10.38 or
20.60, as applicable.
E. Provide with a nonreversible ratchet device to prevent backspin of the pump.
2.06 DISCHARGE HEAD
A. The discharge head consists of a discharge elbow and sole plate, plus nipples, couplings, and appurtenances as described below and as shown on the Drawings.
B. The discharge elbow shall incorporate a 6-inch diameter long-radius elbow welded securely to an ANSI Class 150 16-inch flange and shall rigidly support the total weight of the motor, bowl assembly, discharge pipe, cable, and column of water. Provide weld structural calculations with pump submittals.
C. Discharge head shall include I-bolts or lifting lugs to facilitate removal, as shown on Drawings.
D. Discharge head shall include one 1-inch diameter threaded full coupling for manual well sounding, one 2-1/2-inch rigid electrical conduit nipple for pump power cable, and one 1- 1/2-inch rigid electrical conduit nipple for pump control wires as shown on the Drawings.
Provide threaded caps or plugs for nipples and couplings.
E. Provide a separate steel sole (sub-base) plate manufactured expressly for the discharge elbow provided. Sole plate shall be of A36 fabricated steel. Minimum thickness 2 inches.
2.07 SEALED GLAND FITTINGS
A. Provide sealed gland fittings on the discharge head and existing 2-inch sounding tube to allow passage of the power, motor fault, and level sensor conductors while retaining the well internal artesian water pressure.
1. For power cable, fitting shall be OZ Gedney, type CSBI, part number CSBG-250 P1, with holes sized for the 4 individual insulated conductors. Fittings shall fit on the 2-1/2-inch Rigid Conduit Nipple on the well discharge head.
2. For motor fault signal, fitting shall be OZ Gedney, type CSBI, part number CSBG150 P-1, with holes sized for the individual insulated conductors. Fittings shall fit on the 1-1/2-inch Rigid Conduit Nipple on the well discharge head plate.
3. For level transducer (mounted on existing 2-inch well sounding tube east of sole plate) fitting shall be OZ Gedney, type CSBG, part number CSBG-200P-1, with holes sized for the 1 individual insulated conductors. Fittings shall fit on the 2- inch well sounding pipe east of the well seal plate.
2.08 COLUMN PIPE
A. The total length of the column pipe shall allow pump setting at depth specified.
B. The column pipe shall be schedule 40 steel, not less than 8-inches in diameter. Discharge pipe jointsshall be threaded in 21-foot maximum lengths. Provide swaged reducer nipple as needed to match pump discharge diameter.
West Yost – December 2024
270-30-23-22
11342 - 9
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Top and bottom sections of discharge pipe shall not exceed 5 feet in length.
2.09 IN-LINE CHECK VALVES
A. Provide two (2) in-line check valves: one at pump discharge and one approximately 125 feet below top of casing as shown on Drawings.
B. In-line check valves shall be 8-inch diameter, Flomatic Model 80DIX with break off plug, or approved equal.
C. If submersible pump is provided with a check valve on the discharge, only the additional in-line check valve at 125 feet is required.
2.10 SUBMERSIBLE CABLE
A. Pump cable shall be sized to limit the voltage drop to no more than 5%. The cable shall have three separate insulated conductors plus an insulated ground wire and shall be included in a single continuous flat jacketed assembly.
B. The insulation shall be water and oil resistant, and suitable for continuous immersion.
C. The cable shall be the length of the discharge pipe plus 15 feet to extend from the surface plate to the terminal box. Cable splices inside the well casing shall not be allowed.
D. The cable shall be adequately secured to the discharge pipe by stainless steel cable clamps, at 10-foot intervals. Cable shall be protected from cutting by stainless steel clamps by wrapping with fabric reinforced rubber sheeting or other material satisfactory to the Engineer.
E. Pump cable shall be minimum 4/0 copper wire construction, with 75-degree C insulation, Type THW, 600 volt rated.
F. Approved manufacturers include Regency Wire, Service Wire Co, Centralift, Paige Electric.
2.11 DATA PLATES
A. Mount a data plate on each pump unit.
B. Data plates shall contain the manufacture’s name, pump size and type, serial number speed, impeller diameter, capacity and head rating, and other pertinent data.
2.12 APPURTENANCES
A. Provide two, 1-inch nominal perforated PVC Schedule 40 sounding tubes from the well seal plate coupling connections to the top of the pump bowl assembly.
B. Attach the PVC sounding tubes to the column pipe at 10-foot intervals by taping with 10- mil PVC underwater tape. Strapping via stainless steel clamps along with the electrical drop cable shall not be allowed.
2.13 ACCESSORIES
A. Anchor Bolts
1. Comply with Section 05501
2. Submit calculations stamped and signed by a California-registered Civil or Structural Engineer.
3. Minimum diameter: 1-inch.
West Yost – December 2024
270-30-23-22
11342 - 10
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
4. Type 316 stainless steel
B. Spare Parts:
1. Provide the following spare parts for each model of pump supplied, packed and labeled for warehouse storage:
a. (1) Fullset of manufacturer’sspecial tools necessary for the replacement of parts and adjustment of equipment.
b. (1) suction case bearing set.
c. (1) set of bowl and discharge case bearings.
d. (1) set of line shaft bearings.
e. (2) complete mechanicalseals
f. (2) sets of all gaskets and O-rings.
2. Furnish spare parts and lubricants per Section 11000.
2.14 SOURCE QUALITY CONTROL
A. Factory assemble each pump.
B. Performance Testing
1. Conduct factory performance testing to demonstrate compliance with this Section and submitted performance curves.
2. Notify City one week before test to permit Construction Manager to witness test, at City’s discretion.
3. Conduct testing per Hydraulic Institute Level “1U” standards. a. Test each pump.
b. Plot curves of head, input horsepower, and efficiency against flow from shutoff to 150 percent of rated flow.
c. Take a minimum of six points, including shutoff, for each test run. d. Take one of the six points as near to the rated condition as possible. e. For pumpsin variable speed applications, plot curves at 100 rpm intervals from minimum speed to maximum speed.
4. Summarize results in a written report, stamped and signed by a registered Professional Engineer.
a. Include copies of the testing log originals.
b. Include curves showing pump total head, driver input and output horsepower, pump efficiency, and rpm, plotted against capacity. c. Include calculated field performance curves, based on shop tests and corrected for head losses in all portions of the pump column and forshaft bearing losses not included in the shop tests.
d. If the pump cannot be tested at the rated speed, include performance charts with both test and calculated speed curves.
West Yost – December 2024
270-30-23-22
11342 - 11
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. Discharge Head
1. Test the discharge head to 200 psi or 150% of shutoff head, whichever is greater.
Maintain test pressure for a minimum of five minutes.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install, align and connect pump in strict conformance with manufacturer’s installation instructions. Set impeller clearances, lubricate, and perform all adjustments and other tasks specified by the manufacturer.
B. Anchor bolts: Place accurately using equipment templates.
C. Leveling
1. The sole plate shall be shimmed using steel wedges until the eccentricity of the headshaft to the discharge head is within 0.002 inch.
2. Steel wedge taper shall be less than 1/4-inch per foot. Double-wedges shall be used to provide a parallel bearing surface. The Contractor and manufacturer's representative shall accomplish wedging so that the sole plate is not sprung out of place.
3. The sole plate final location and alignment shall be carefully maintained, and the discharge head lifted, to provide access to the joint between the well casing and the sole plate.
4. This joint shall be sealed by a 3/8-inch thick angle ring around the casing, which is continuously seal welded to the casing and the sole plate.
5. Welding shall meet applicable standards of the AWS and form an air tight seal at the joint between the well casing and sole plate.
6. The sole plate shall be secured to the concrete pedestal with cast-in-place anchor bolts. Anchor bolt size shall be as recommended by the manufacturer, but not less than 1-inch in diameter. The space between the sole plate and the concrete pedestal shall be grouted with a non-shrink grout. Remove wedges after grout has set and fill voids with grout.
7. Install the discharge head on the sole plate with a flat gasket seal.
8. Connect discharge piping without imposing strain on pump flanges.
3.02 FIELD QUALITY CONTROL
A. Perform field quality control and inspections as recommended by the manufacturer.
B. Corrective Actions: Replace or repair work to eliminate defects, deficiencies and irregularities.
3.03 FIELD TESTS
A. General
1. Comply with Section 01825.
West Yost – December 2024
270-30-23-22
11342 - 12
Submersible Well Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2. Conduct field performance tests to demonstrate that pump operation and controls meet the specified requirements.
3. Test complete pump assemblies for correct rotation, proper alignment and connection, and quiet operation.
3.04 MANUFACTURER’S FIELD SERVICES
A. Provide field inspection and instruction services by a factory-trained service technician or factory-trained authorized agent of the manufacturer. Sales representatives without factory training are not acceptable.
B. Provide minimum 2 visits of 8 hours each, excluding travel time, to witness the following; to perform field adjustments to ensure that the equipment installation and operation comply with the specified requirements; and to certify in writing that the equipment and controls have been properly installed, aligned, lubricated, adjusted, and readied for operation.
1. Installation of the equipment
2. Inspection, checking and adjusting the equipment
3. Startup and field testing for proper operation
C. Provide minimum 2 visits of 4 hours, excluding travel time, to train operation and maintenance staff on two different shifts. Comply with Section 01820.
D. Complete and submit the following forms:
1. Manufacturer’sInstallation Certification (Section 01999)
2. Training Certification Form (Section 01999)
END OF SECTION
West Yost – December 2024
270-30-23-22
11364 - 1
Centrifugal Water Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 11364
CENTRIFUGAL WATER PUMP
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Provide a complete, tested, and operating centrifugal pump as shown on the Drawings and specified herein.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 01611 – Seismic Design Requirements
3. Section 01825 – Equipment and System Testing
4. Section 01999 – Reference Forms
5. Section 09960 – High Performance Coatings
6. Section 11060 – Electric Motors
7. Section 13224 – Pressure Filter
8. Section 15110 – Valves and Appurtenances
1.03 SUBMITTALS
A. Comply with Section 01330.
B. Submit the following as a single complete initial submittal:
1. Product data demonstrating that the equipment conforms to the Specifications.
2. Pump performance curve.
3. Pump layout and dimensions.
4. Motor data.
5. Seismic anchorage calculations and related drawings.
C. Seismic Certification: Submit certification from the manufacturer that the equipment is capable of resisting seismic loads. Loading shall be as described in Section 01611.
D. Performance Testing: Submit certified non-witnessed factory performance test results in accordance with the Hydraulics Institute. Receive favorable review of test results prior to shipping the equipment
E. Manuals: Furnish manufacturer's installation, lubrication, operation and maintenance manuals, bulletins, and spare parts lists.
F. Submit Manufacturer’s Installation Certification Form from the manufacturerstating that the equipment has been properly installed, adjusted, and tested and isready for full-time operation (Section 01999).
West Yost – December 2024
270-30-23-22
11364 - 2
Centrifugal Water Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
1.04 PERFORMANCE AND DESIGN REQUIREMENTS
A. Pump performance shall be as specified:
1. Quantity: One (1) pump.
2. Type: Single Stage – End Suction
3. Primary Point: 157 gpm at 70 feet TDH or as needed for filtersurface wash - to be determined by the Filter System Supplier. See Section 13224.
4. Maximum Motor Speed: 1800 RPM.
5. Motor Horsepower: Assumed to be 5 HP, to be determined by the Filter System Supplier.
6. Motor Drive: Fixed Speed.
7. Minimum Suction x Discharge Size: 2.5-inch x 2-inch
8. Minimum Guaranteed Efficiency at Primary Point: 60%.
B. Pump shall operate without excessive noise or vibration over its full operating range.
Vibration shall meet Hydraulic Institute Standards.
C. Actual tested horsepower of the pump with the final impeller trim shall not exceed the motor nameplate horsepower at any point on the pump curve.
1.05 QUALITY ASSURANCE
A. Equipment furnished under this Section shall be supplied by a single manufacturer who has been regularly engaged in the design and manufacture of the equipment for at least five years.
B. Demonstrate to the satisfaction of the Engineer that the quality to equipment made by those manufacturers named herein.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Aurora; Goulds; or equal.
2.02 PUMP
A. Pump Assembly: Single Stage End Suction pump shall be horizontally mounted with mechanical seals. Casing shall be end suction and arranged for back pullout. Disassembly shall not require disturbing either suction or discharge piping connections or connections to motor. Suction and discharge piping connections shall be flanged. Mount each pump and motor on a formed steel support base. Connect pump and motor with a heavy-duty flexible coupling complete with galvanized steel shaft/coupling guard.
B. Materials
1. Casing: Close-grained high tensile strength cast iron.
2. Impeller: Bronze, ASTM B-62.
3. Shaft: High tensile strength steel.
4. Shaft sleeve: Bronze.
West Yost – December 2024
270-30-23-22
11364 - 3
Centrifugal Water Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
5. Wear rings: Renewable, bronze.
C. Impeller: Enclosed type, statically and dynamically balanced. Secure against rotation on the shaft by means of a key. The first critical shaft speed shall be at least 125% of full operating speed.
D. Bearings: Oversized, heavy-duty, grease lubricated ball-bearing or roller bearing type.
Split Case pumps shall have an AFBMA minimum B-10 life of 50,000 hours. End Suction pumps shall have an AFBMA minimum B-10 life of 20,000 hours.
E. Pump Seal: Pumps shall have single mechanical shaft seals with ceramic or Ni-Resist stationary seat, carbon washer, BUNA elastomer, and stainless steel housing parts and springs. Provide a coppertubing flush water line from a connection atthe top of the casing to each seal. At a high point in the line, provide a tee for venting with a bronze valve.
F. Motor: Provide motors for suitable for operation at 480 volts and conforming to requirements of Section 11060. Nameplate motor horsepower shall not be exceeded at any flow up through the maximum operating point of the pump.
2.03 ACCESSORIES
A. Provide suction and discharge pressure gauges for each pump with features and accessories in accordance with Section 15110.
2.04 FINISHES
A. Apply manufacturer’sstandard factory paint finish.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install the pump unit(s) in strict conformance with manufacturer's installation instructions. Check pump and motor alignment according to the Standards of the Hydraulic Institute after complete unit has been installed at the site.
3.02 PAINTING
A. Apply a final color coat of paint to the pump units(s) in accordance with Section 09960.
3.03 FIELD SERVICE
A. The equipment manufacturer shall supply a competent field service engineer to thoroughly check and inspect the equipment after installation, place the equipment in operation, make necessary adjustments, calibrate instruments, and conduct field tests.
3.04 FIELD TESTING
A. All pumps shall be field tested and will be witnessed by the Engineer. For further requirements on tests, refer to Section 01825. Prior to performing pumping tests, the following tests shall have been satisfactorily completed.
1. Piping leakage tests.
2. Valve control and operation.
3. Pump seal water systems (if applicable).
4. Electrical testing of circuits, controls, and conductors.
West Yost – December 2024
270-30-23-22
11364 - 4
Centrifugal Water Pump
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. Perform field testing in accordance with Equipment Startup and Adjustment as required in Section 01825.
END OF SECTION
West Yost – December 2024
270-30-23-22
11380 - 1
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 11380
CHEMICAL FEED EQUIPMENT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Provide complete, tested, and operating chemical transfer pumps and metering pumps for the sodium hypochlorite, ferric chloride, and ammonium sulfate systems, asshown on the Drawings and specified herein.
B. Equipment List
1. Sodium Hypochlorite Transfer Pump: P410
2. Sodium Hypochlorite Metering Pump No. 1: P411
3. Sodium Hypochlorite Metering Pump No. 2: P412
4. Ferric Chloride Transfer Pump: P420
5. Ferric Chloride Metering Pump No. 1: P421
6. Ferric Chloride Metering Pump No. 2: P422
7. Ammonium Sulfate Transfer Pump: P430
8. Ammonium Sulfate Metering Pump No. 1: P431
9. Ammonium Sulfate Metering Pump No. 2: P432
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 01610 – Seismic Anchoring and Bracing
3. Section 01611 – Seismic Design Requirements
4. Section 01820 – Training
5. Section 01999 – Reference Forms
6. Section 09960 – High Performance Coatings
7. Section 10200 – Safety and Signage
8. Section 11060 – Electric Motors
9. Section 13216 – Chemical Storage Tanks
10. Section 16010 – Electrical
1.03 SUBMITTALS
A. Comply with Section 01330.
West Yost – December 2024
270-30-23-22
11380 - 2
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. Submit the following items:
1. Shop Drawings and Product Data
a. Product data to demonstrate that the equipment and accessories conforms to the Specifications.
b. Pump layout with dimensions and connection sizes, location, and details. c. Pump performance data.
d. Materials of construction.
e. Motor data, asrequired in Section 11060.
f. Electrical wiring and connection diagrams.
2. Seismic Calculations and Certifications
a. Anchorage calculations for the equipment meeting requirements in Section 01610.
b. Seismic certification for all equipment, certifying that the equipment is designed to resist any internal loading based on the loading requirements in Section 01611.
3. Manuals
a. Furnish manufacturer’s installation, lubrication, operation, and maintenance manuals, bulletins, and spare partslist for each system.
4. Material Safety Data Sheets (MSDS) for each chemical used during testing of each chemical feed system.
5. Completed Manufacturer’s Installation Certification Form for each piece of equipment (Section 01999).
1.04 DESIGN REQUIREMENTS
A. All components and equipment shall be suitable for the following bulk (as delivered) chemicals in the specified (approximate) percentage by weight of solution:
Chemical Concentration Specific Gravity
Sodium Hypochlorite 12.5% 1.20
Ferric Chloride 40% 1.40
Ammonium Sulfate 39% 1.22
B. Wetted components shall be compatible with the pumped chemical.
C. Equipment and installation shall comply with the seismic requirements in Sections 01610 and 01611.
1.05 QUALITY ASSURANCE
A. All products furnished under this section shall be from a single manufacturer who has been regularly engaged in the manufacture of the pumps specified for at least five years.
Demonstrate to the satisfaction of the Engineer that the quality is equal to equipment made by the manufacturers named herein.
West Yost – December 2024
270-30-23-22
11380 - 3
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. Comply with the following regulatory standards:
1. Uniform Fire Code, especially Article 80, Hazardous Materials, with local amendments, if any.
2. California Building Code.
PART 2 - PRODUCTS
2.01 SELF PRIMING MAGNETIC DRIVE SEAL-LESS PUMPS
A. Magnetic Drive Chemical Transfer Pump Schedule
Service
Sodium Hypochlorite,
12.5%
Ferric Chloride,
40%
Ammonium
Sulfate, 39%
Quantity of Pumps 1 1 1
Pump Tag No. P410 P420 P430
Minimum Lift (of Water) 10 FT 10 FT 10 FT
Primary Point 18 GPM @
15 FT ±4 FT
18 GPM @
15 FT ±4 FT
18 GPM @
15 FT ±4 FT
Maximum Capacity 21 GPM 21 GPM 21 GPM
Shutoff Head 28 FT ±3 FT 28 FT ±3 FT 28 FT ±3 FT
Motor Horsepower 1/3 HP 1/3 HP 1/3 HP
B. Type
1. Each pump shall be a self-priming, seal-less, centrifugal pump with a magnetic drive, designed for continuous duty.
C. Performance
1. The pumps shall operate without excessive noise or vibration over the full operating range indicated in the Magnetic Drive Chemical Transfer Pumps Schedule above.
D. Materials
1. Pump Casing and End Cover: Polypropylene
2. Impeller: Silicone Carbide
3. Impeller Shaft: Ceramic
4. Thrust Ring: Ceramic
5. O-ring: Viton
E. Connections
1. The pump suction and discharge connections shall be 1-inch, minimum, MNPT.
F. Magnetic Drive
1. The pump drive shall be a dynamically balanced, encapsulated, drive magnet that generates a rotating field from the electric power supply. The magnetic field shall cause rotation of the pump impeller without direct contact to the electric motor shaft.
West Yost – December 2024
270-30-23-22
11380 - 4
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
G. Electric Motor
1. Motorsize as indicated in the Magnetic Drive Chemical Transfer Pumps Schedule above. See Section 11060 for additional requirements.
2. The pump shall be capable of operating on 115V, 60 Hz, single phase power supply.
H. Controls
1. Provide a spring-loaded hand-offswitch for control ofthe chemicaltransfer pump that requires physically holding the switch in the on-position to run the pump.
2. See Section 16010 for pushbutton requirements.
I. Manufacturer
1. Sethco, PMSP 500 Series;
2. Finish Thompson, SP 10 Series;
3. Or equal.
2.02 DIAPHRAGM PUMPS
A. Diaphragm Metering Pump Schedule
Service Ferric Chloride,
40%
Ammonium Sulfate, 39%
Quantity of Pumps 2 2
Pump Tag No. P421, P422 P431, P432
Minimum Operating Capacity 0.11 GPH 0.24 GPH
Maximum Operating Capacity 0.21 GPH 0.30 GPH
Maximum Pump Capacity 0.35 GPH 0.52 GPH
Maximum Operating Pressure 90 PSI 90 PSI
Pump Rated Pressure (Minimum) 150 PSI 150 PSI
B. Type
1. Each pump shall be a positive displacement, electronic, solenoid driven, diaphragm metering pump.
C. Performance
1. The metering pump shall be capable of pumping the maximum pump capacity against the pump rated pressure specified in the Diaphragm Metering Pump Schedule above.
2. The maximum pump capacity is at the 100-percentstroke and 100-percent speed output.
3. The stroke length shall be adjustable from 10:1 and the stroke speed shall be adjustable from 20:1, minimum, for a minimum turn down ratio of 200:1.
4. Metering performance shall be reproducible to within ±3-percent of the maximum capacity.
West Yost – December 2024
270-30-23-22
11380 - 5
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
D. Construction
1. Each metering pump shall be a complete assembly including head, diaphragm, and integral check valve.
2. Provide a diaphragm leak detector mounted on the pump head to detect diaphragm failure.
E. Materials
1. Use the following Head: PVDF
2. Fittings: PVDF
3. Balls: Ceramic
4. Seat/O-rings: PTFE
F. Drive
1. The pump mechanism shall be totally enclosed with no exposed moving parts.
2. The electronic control module shall be located opposite of the liquid end and protected by a clear cover.
3. The average power consumption shall not exceed 24 watts when operating at full speed and against maximum pressure conditions.
G. Controls
1. The pump shall be capable of manual control from a front control panel touchpad.
2. The pump shall be capable of remote start/stop.
3. The pump shall be capable of external pacing control via a 4-20mA analog input.
4. The pump shall have a 4-20mA speed output signal for remote monitoring.
H. Manufacturer
1. Walchem, EWN Series;
2. LMI, PD Series;
3. Or equal.
2.03 PERISTALTIC PUMPS
A. Peristaltic Metering Pump Schedule
Service Sodium Hypochlorite, 12.5%
Quantity of Pumps 2
Pump Tag No. P411, P412
Minimum Operating Capacity 1.00 GPH
Maximum Operating Capacity 1.25 GPH
Maximum Pump Capacity 1.70 GPH
Maximum Operating Pressure 90 PSI
Pump Rated Pressure (Minimum) 100 PSI
West Yost – December 2024
270-30-23-22
11380 - 6
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. Type
1. Each pump shall be a positive displacement, peristaltic type tubing pump with a non-spring-loaded roller assembly located in the pump head, and tubing assembly with attached connection fittings.
C. Performance
1. The metering pump capacity and rated pressure shall be as specified in the Peristaltic Metering Pump Schedule above.
2. The pump shall be capable of running dry without damage.
3. The pump shall be capable of operating in either direction without variation.
4. The pump shall be capable of self-priming at the maximum rated pressure.
Suction lift shall be at least 20 feet of water.
D. Pump Head
1. The pump head shall be a single, unbroken track with a clear removable cover or clear door. The pump head cover or door shall not require tools for removal of the cover or opening of the door.
2. The rotor assembly shall install onto the motor shaft and be removable without tools.
3. Provide tube failure detection in the pump head. The tube failure detection system shall sense tube failure by detecting chemical in the pump head and shall stop the pump and provide an output alarm when chemical in the pump head is detected.
E. Tubing Assembly
1. The tubing shall be provided by the pump manufacturer. Only tubing provided by the pump manufacturer will be acceptable.
2. The pump tube shall be assembled to connection fittings. Fitting connectionsshall be 3/4-inch tri-clamp adapters.
3. Select tube size to provide the specified pump output range at the maximum pump rated pressure.
4. The tube material shall be compatible with the pumped chemical.
F. Drive System
1. The drive system shall be installed and totally enclosed in a NEMA 4X (IP66) washdown enclosure.
2. The pump shall be capable of operating on 110VAC or 208VAC, 60 Hz,single phase power supply.
3. Motor shall be reversible, 1/8-HP DC gear motor rated for continuous duty and shall include overload protection.
G. Controls
1. The pump shall be capable of manual control from a front control panel touchpad.
West Yost – December 2024
270-30-23-22
11380 - 7
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2. The pump shall be capable of remote start/stop and external pacing control via a 4-20mA analog input.
H. Manufacturer
1. Blue-White, ProSeries Flex-Pro;
2. Verder, Vantage 5000;
3. Or equal.
2.04 CHEMICAL FEED SYSTEM ACCESSORIES
A. General: Materials of construction shall be satisfactory for continuous exposure to the chemicals listed herein.
B. Piping Specialties
1. Y-Strainers
a. Provide a Y-strainer on the suction pipeline of each chemical metering pump.
b. Materials
1) Body: PVC
2) Screen: PVC
3) Seals: FPM/FKM/Viton for Sodium Hypochlorite service; EDPM for all other chemical services
c. Screen: 1/32-inch perforations
d. Connections: True union
e. Strainer shall have hex cap for access to screen.
2. Pulsation Dampeners
a. Provide a pulsation dampener with pressure gauge on the discharge pipeline of each chemical metering pump.
b. Properly size pulsation dampener for each chemical metering pump. c. Maximum rated pressure shall be at least 150 psi.
d. Materials
1) Body: PVC
2) Bladder: FPM/FKM/Viton for Sodium Hypochlorite service; EDPM for all other chemical services
e. Connections: NPT
3. Pressure Relief and Back Pressure Valves
a. Provide pressure relief valves and back pressure valves on the discharge pipeline of each chemical metering pump. Install valves where shown on the Drawings and/or as recommended by the manufacturer. b. Valves shall be rated to 150 psi and shall be field adjustable from 10 to 150 psi.
c. Materials
1) Body: PVC
West Yost – December 2024
270-30-23-22
11380 - 8
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2) Diaphragm: FPM/FKM/Viton for Sodium Hypochlorite service; EDPM for all other chemical services.
d. Connections: NPT
C. Flexible Connections
1. Provide hosesin the chemical piping systems where shown on the Drawings. Each chemical metering pump shall have flexible connections in the suction and discharge piping. Each tank shall have flexible connections at the tank outlet to the chemical pump suction.
2. Hose material shall be as listed below for each chemical system. a. Ammonium Sulfate: PTFE, PVC (Reinforced), PVDF, or Viton b. Ferric Chloride: PTFE, PVC (Reinforced), PVDF, or Viton c. Sodium Hypochlorite: PTFE, PVC (Reinforced), PVDF, or Viton
3. Hose Length
a. At Pump Suction and Discharge: No less than 6 incheslong b. At Tanks: No less than 18 inches long
D. Calibration Cylinders
1. Provide a graduated calibration cylinder for each chemical metering pump.
2. The calibration cylinder size shall be as follows:
a. Ammonium Sulfate: 100 mL
b. Ferric Chloride: 100 mL
c. Sodium Hypochlorite: 200 mL
3. Material: PVC
4. Connections: Socket; removable top seal with vent connection E. Chemical Injection Assembly
1. Provide a chemical injection assembly where shown on the Drawings. The assembly shall include a corporation stop and injection quill. The assembly shall be retractable and shall have an integral check valve.
2. Connection size and insertion length shall be as noted on the Drawings.
3. Pressure Rating: 150 psi
4. Materials
a. Valve and Solution Tube: Hastelloy C
b. Seals: FPM/FKM/Viton for Sodium Hypochlorite service; EDPM for all other chemical services.
5. Manufacturer: Safe-T-Flo; Primary Fluid Systems Inc.; or equal.
F. Static Mixers
1. General: Provide static mixers where shown on the Drawings. Static mixer shall be the same diameter as the surrounding pipe. Static mixers shall have integral
West Yost – December 2024
270-30-23-22
11380 - 9
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
mixing elements in a helical pattern to mix the chemical solution injected upstream of the mixer with the process water as they travel through the mixing elements.
2. Material: Carbon Steel
3. Connections: ASME B16.5 Class 150 Flange
4. Number of Mixing Elements integral to mixer: 3, minimum
5. Manufacturer: Komax; Koflo; or equal.
G. Pump Panel
1. Provide pump panels for mounting the chemical metering pumps, piping, and appurtenances as shown on the Drawings.
2. The pump panelsshall be constructed of polyethylene material that is compatible with the pumped chemical.
3. Provide shelves on the pump panels for attaching the chemical metering pumps.
Provide a 2-inch deep, water-tight sill at the base of each panel for containing minor chemical leaks and spills.
4. The pump panels shall be mounted to the wall as shown on the Drawings.
H. Chemical Weigh Scale and Indicator
1. Weigh Scale
a. Provide a weigh scale for each chemical day tank sized to accept the tanks noted in the schedule below:
Chemical Tank Size (in. Dia.) Max Weight (lbs)
Ammonium Sulfate 23 590
Sodium Hypochlorite 31 1,610
Ferric Chloride 23 370
b. Provide four (4) adjustable tank restraint clipsto secure the vessel to the platform.
c. Accuracy: 0.25% of the fullscale capacity.
d. Platform scale coating shall be resistant to moisture, chemical, abrasion, impact, and UV light.
2. Digital Indicator
a. Provide a digital indicator for each weigh scale.
b. The indicator shall be housed in a NEMA 4X, UL approved enclosure. c. The indicator shall have a backlit alphanumeric display. d. The indicator shall have an adjustable 4-20 mA signal that outputs net weight and chemical use rate for each scale.
e. The indicator shall display alarms for the following conditions, at minimum: low level, high level, high use rate, supply exhausted, and load cell failure.
West Yost – December 2024
270-30-23-22
11380 - 10
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
f. The indicatorshall have sufficientrelaysforthe alarms and pump controls indicated on the Drawings.
g. The indicator shall be capable of remote communication with MODBUS.
3. Manufacturer: Force Flow, Chem-Scale with Solo G-2 Indicator; or equal.
I. Electric Pallet Jack
1. Provide an electric pallet jack for transporting chemical tote and drums into and out of the building.
2. Performance
a. Load Capacity: Maximum load capacity of at least 3,000 pounds. b. Gradeability: The pallet jack shall have amaximum gradeability underfull load of at least 10-percent.
c. Travel Speed: The pallet jack shall be capable oftraveling at least 3.5 mph when fully loaded.
3. Size
a. Fork Length: 48-inch, nominal.
b. Overall Length: 71±1 inch.
c. Overall Width: 27±1 inch.
d. Overall Height: 48±1 inch, fully raised handle.
4. Construction
a. Forks: Box rail fork construction with tapered fork tipsfor pallet entry. b. Hydraulic Lift: Equip with dual lift cylinders and torsional bar. c. Drive Unit and Brakes: AC drive motor; equipped with parking brakes and ramp hold feature to prevent reverse travel on an incline. d. Safety Features: Provide pallet with electric horn, emergency power disconnect, and anti-roll back system.
5. Power Supply: 24-volt electrical system with transistor control sealed from dirt, dust, and moisture. Include battery compartment, battery package, and charger to power the pallet jack.
6. Manufacturers: Crown; Toyota; or equal.
2.05 SPECIAL TOOLS AND SPARE PARTS
A. Furnish any special toolsrequired for replacement of parts and adjustment of equipment.
B. Furnish spare parts necessary for continued operation of the equipment.
1. For each diaphragm pump supplied, spare parts shall include but not be limited to one set of: valve seats, seals, diaphragm, pump seals, bearings, and fuses.
2. For each peristaltic pump supplied,spare partsshall include but not be limited to:
two tubing assemblies with connection fittings.
West Yost – December 2024
270-30-23-22
11380 - 11
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install chemical feed equipment in strict conformance with the manufacturer’s installation instructions and with favorably reviewed shop drawings.
B. An authorized representative of the equipment manufacturershall perform check of final installation, startup, adjustment, calibration, and training.
3.02 FIELD PAINTING
A. Apply final coat of paint to equipment in accordance with Section 09960.
3.03 IDENTIFICATION
A. Identification of health, flammability, and reactivity of each chemical shall be affixed above each chemical feed area. See Section 10200 for signage requirements.
3.04 FIELD TESTING
A. Leak tests of chemical storage tanks shall be successfully completed (Section 13216) before beginning testing of chemical transfer and feed equipment.
B. Initial Test with Potable Water
1. Test each chemical feed system for four hours with potable water.
2. Test shall include pumping of chemicalsystem against a closed discharge solution pipeline to test relief valve operation. This shall be performed for each chemical metering pump and witnessed by the Engineer.
3. Following satisfactory testing with water, completely drain and remove water from the chemicalsystem. Thoroughly dry the chemicalsystem pipeline. This may require blowing oil-free dry air through the pipelines.
4. Dispose of water used for testing and cleaning of the chemical systems.
C. Final Test with Chemical
1. Final test with chemical shall proceed only after satisfactory testing with water, complete draining and removal of water from the chemicalsystem, and thorough drying.
2. Provide sufficient chemical for test. The chemicals used for the field tests shall be favorably reviewed by the Engineer prior to the test. The MSDS for each chemical shall be on hand during the testing of each chemical feed system.
3. Calibrate each chemical metering pump with chemicalsolution and test the pump operation throughout its pumping range. Test each chemical feed system in all operation and alarm modes to show conformance with these Specifications.
3.05 FIELD SERVICES
A. Provide an engineer or technician from the chemical feed equipment supplier(s) to make all adjustment and monitor the field testing specified in Paragraphs 3.01 and 3.03 above.
West Yost – December 2024
270-30-23-22
11380 - 12
Chemical Feed Equipment
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. After successful completion of the field testing, the engineer or technician from the chemical feed equipment supplier(s) shall provide training to plant personnel in system operation, maintenance, and safety procedures, per Section 01820.
END OF SECTION
West Yost – December 2024
270-30-23-22
11475 - 1
Air Compressor Unit
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 11475
AIR COMPRESSOR UNIT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Provide a complete, tested, and operating oil-less air compressor and accessories as shown on the Drawings and specified herein.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 01611 – Seismic Design Requirements
3. Section 01999 – Reference Forms
4. Section 09960 – High Performance Coatings
5. Section 11060 – Electric Motors
6. Section 13224 – Pressure Filter
1.03 SUBMITTALS
A. Comply with Section 01330.
B. Submit the following as a single complete initial submittal:
1. Product data demonstrating that the equipment conforms to the Specifications.
2. Motor data as required in Section 11060.
3. Seismic anchorage design and related drawings.
C. Seismic Certification: Submit certification from the manufacturer that the equipment is capable of resisting seismic loads. Loading shall be as described in Section 01611.
D. Manuals: Furnish manufacturer's installation, lubrication, operation and maintenance manuals, bulletins, and spare parts lists.
E. Submit Manufacturer’s Installation Certification Form from the manufacturerstating that the equipment has been properly installed, adjusted, and tested and isready for full-time operation (Section 01999).
1.04 QUALITY ASSURANCE
A. Equipment furnished under this Section shall be supplied by a single manufacturer who has been regularly engaged in the design and manufacture of the equipment for at least five years.
B. Demonstrate to the satisfaction of the Engineer that the quality to equipment made by those manufacturers named herein.
West Yost – December 2024
270-30-23-22
11475 - 2
Air Compressor Unit
City of Milpitas
WellUpgrades Program
McCandless Well Facility
PART 2 - PRODUCTS
2.01 AIR COMPRESSOR UNIT
A. Air Compressor
1. Quantity: One (1).
2. Type: Simplex, stationary, electric, tank-mounted.
3. Capacity: Air flow and pressure requirements for the air compressor shall be as needed for the operation of the filter solenoid valve panel and pneumatic valve actuators and shall be determined by the Filter System Supplier. See Section 13224.
4. Construction: Compressor, motor, and accessoriesshall be factory assembled and mounted on a steel frame. Design shall be corrosion-resistant and shall use oil for lubrication of rotating parts.
5. Motor: Motor size shall be determined by the Filter System Supplier. Motor shall be suitable for operation with 480 volts, three phase power supply and shall conform to the requirements of Section 11060.
B. Compressor Tank
1. Tank Size: Tank size shall be determined by the Filter System Supplier.
2. Orientation: Vertical.
3. Material: Cast iron.
4. Standard: Conform to ASME Tank Standard.
C. Accessories
1. Provide a manual drain valve, oil sight class, pressure gauge and pressure safety valve.
2. Provide 1 quartsupply of lubrication oil.
D. Finish: Apply manufacturer’sstandard factory paint finish.
E. Manufacturers: Speedaire; or equal.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install equipment in strict conformance with the manufacturer’sinstallation instructions.
3.02 PAINTING
A. Apply a final color coat of paint in the field to the compressor assembly in accordance with Section 09960.
3.03 FIELD TESTING
A. Field test with Pressure Filter System. See Section 13224.
B. Furnish equipment and apparatus necessary for tests.
END OF SECTION
West Yost – December 2024
270-30-23-22
11500 - 1
Disinfection
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 11500
DISINFECTION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Furnish materials, tools, equipment, and labor required to disinfect the following facilities:
1. Well
2. Filter Vessel with Filter Media
3. Large Pipelines
a. Well artesian relief and flush pipelines
b. Raw water pipelines
c. Filtered water pipelines
d. Treated water pipelines
e. Surface wash pipelines
f. Backwash pipelines
g. Filter-to-waste pipelines
4. Small Pipelines
a. Chemical pipelines
b. Sample pipelines
c. Domestic/Potable water pipelines
B. Provide required testing.
C. Dechlorinate and dispose of disinfection solution.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section
1. Section 01330 – Submittals
2. Section 01560 – Environmental Controls
1.03 REFERENCED STANDARDS
A. American Water Works Association (AWWA):
1. AWWA B300 Hypochlorites
2. AWWA C651 Disinfecting Water Mains
3. AWWA C652 Disinfection of Water Storage Facilities
4. AWWA C653 Disinfection of Water Treatment Plants
5. AWWA C654 Disinfection of Wells
6. AWWA C655 Field Dechlorination
West Yost – December 2024
270-30-23-22
11500 - 2
Disinfection
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. National Sanitation Foundation (NSF)/ ANSI:
1. NSF/ANSI Standard 60: Drinking Water Treatment Chemicals – Health Effects
1.04 SUBMITTALS
A. Comply with Section 01330.
B. Submit a Disinfection Plan at least 30 days prior to conducting disinfection. At minimum, the Disinfection Plan shall include the following components:
1. Proposed schedule for disinfecting the required surfaces.
2. Methods, procedures, and materials that will be used to disinfect each type of facility (e.g., well, filter, large pipelines, and small pipelines).
3. Drawing(s) showing temporary facilities needed to complete the disinfection process, including: closed valves and isolation points; configuration of temporary piping, pumping, and equipment; disinfection solution injection locations; and sample locations.
4. Method of disposing spent disinfection solution.
C. Submit product information for disinfectant and dichlorination chemicals that will be used.
D. Submit the laboratory test results.
1.05 QUALITY ASSURANCE
A. Demonstrate through analytical testing that the facility is disinfected and meets requirements specified in the AWWA standard for disinfection of the associated type of facility.
B. Enlist the services of a testing laboratory to obtain, transport, and test water samples.
The testing laboratory shall be certified to perform bacteriological testing in accordance with the AWWA standards.
C. Testing expenses, including laboratory testing, shall be borne by the Contractor.
PART 2 - PRODUCTS
2.01 DILUTION WATER
A. Obtain potable water from the existing water distribution system. Establish temporary connection to existing distribution system and provide protection against crossconnection as required by AWWA C651.
2.02 DISINFECTANT
A. Use sodium hypochlorite solution or calcium hypochlorite granules or tablets meeting the requirements of AWWA B300. Do not use hypochlorite manufactured for swimming pools.
West Yost – December 2024
270-30-23-22
11500 - 3
Disinfection
City of Milpitas
WellUpgrades Program
McCandless Well Facility
PART 3 - EXECUTION
3.01 SCHEDULING AND SEQUENCING
A. Disinfection of facilities shall occur only after successful completion of required pressure testing of the facilities.
B. Disinfection of the filter shall occur after the filter media has been placed, backwashed, and prepared for service.
C. When disinfection of a facility has been satisfactorily completed, no further entry to the interior of the facility will be allowed. See Paragraph 3.06 below for requirements is reentry is required.
3.02 PREPARATION
A. Provide all necessary appurtenances required for the disinfection procedures including taps, temporary piping, connections and shutoff valves. Submit data on appurtenances which will be permanently installed for review by the Engineer.
B. The Contractor is advised that precautions taken to keep surfaces clean during construction and avoiding the entry of deleterious substances on the work during construction will facilitate achieving the disinfection requirements of this project.
C. Prior to disinfecting, thoroughly clean accessible surfaces of dust, dirt, foreign matter and deleterious substances remove any oil by contact with absorbents. Use water sprays, steam cleaning, vacuum cleaning, swabbing, hand brushing or a combination of methods and rinsing to effect the cleaning, but do not use any method that will be detrimental to the finish surfaces. Flush inaccessible surfaces clean.
3.03 APPLICATION
A. After completing all construction activities, disinfect the required surfaces with chlorine solutions in accordance with the following procedures. Following disinfection and flushing, the testing laboratory shall obtain water samples for bacteriological analysis of the water. If the specified bacteriological requirements are not satisfied, repeat disinfection procedure until the requirements are met.
B. Well
1. Standard: AWWA C654, as amended herein
2. Forms of Chlorine
a. Sodium hypochlorite or calcium hypochlorite.
b. The disinfecting agent shall be furnished or prepared in liquid form and placed in the well through a hose or tremie of sufficient length to extend to the bottom of the well. Total volume of solution injected shall be at least 150% of the standing water volume in the well casing.
3. Procedures
a. Artesian wells may not require chlorination. Bacteriological sampling and testing may be performed prior to chlorination to determine whether chlorination is necessary.
West Yost – December 2024
270-30-23-22
11500 - 4
Disinfection
City of Milpitas
WellUpgrades Program
McCandless Well Facility
b. If coliforms are determined to be present, chlorine solution should be applied at or below the lowest aquifer formation producing the artesian condition in an amount that will produce at least 25 mg/L in the flowing water.
c. If bacteriological testing still shows the presence of coliform after this disinfection, proceed with the following disinfection procedure:
1) Apply the disinfecting agent through the tremie, which is to be raised and lowered to achieve uniform distribution of the solution throughout the well.
2) After placement of solution, surge the well at least 3 times to improve mixing. The chlorinated water shall remain in the well for at least 12 hours.
3) A residual chlorine level of not lessthan 2 parts per million should remain in the well and shall be verified by the Contractor to the satisfaction of the Engineer.
4. Interim Disinfection
a. Should the constructed well be left idle for three or more days, an interim disinfection shall be conducted by the Contractor.
b. Install an approved disinfecting agent in an amount equal to approximately 10 percent of the amount required for final disinfection but not less than required to maintain the necessary residual. c. The disinfecting agent shall be furnished or prepared in liquid form and placed in the well through a hose or tremie of sufficient length to extend to the bottom of the well.
d. Apply the disinfecting agent through the tremie, which isto be raised and lowered to achieve uniform distribution of the solution throughout the well.
C. Filter
1. Standard: AWWA C652 and AWWA C653, as amended herein.
2. Forms of Chlorine: Sodium hypochlorite or calcium hypochlorite.
3. Method:
a. Walls: AWWA C652, Method 2 (brush or spray)
b. Media: Soak method
D. Large Pipelines
1. Standard: AWWA C651, as amended herein.
2. Forms of Chlorine: Sodium hypochlorite or calcium hypochlorite.
3. Method: Continuous feed.
E. Small Pipelines
1. Preparation: Provide the system with a 1-inch minimum service cock or valve or other means to inject chlorine solution at a point within 2 or 3 feet of its junction
West Yost – December 2024
270-30-23-22
11500 - 5
Disinfection
City of Milpitas
WellUpgrades Program
McCandless Well Facility
with the supply source. When system is complete, thoroughly flush it by fully opening every outlet until clear water flows from all of them.
2. Forms of Chlorine: Sodium hypochlorite or calcium hypochlorite in sufficient quantities to produce chlorine concentration of at least 50 parts per million in the system.
3. Disinfecting Procedure
a. Connect a hand-operated pump, or other means of injecting the disinfecting agent, to one-inch minimum service cock or valve or other injection device. Pump must provide a pressure greater than that of supply of system.
b. With system completely full of water and supply valve open, proceed to adjust every outlet of system so that a trickle of water flows from each. c. Inject disinfectant slowly and continuously at an even rate, not in slugs, until a test at each outlet shows a free chlorine residual concentration of at least 50 parts per million.
d. Close all outlets and valves, including valve connecting to supply line and one-inch minimum service cock on solution injection connection. e. Maintain condition for 24 hours. After 24 hours, test for residual chlorine at each outlet. The free residual chlorine concentration indicated should be not less than 10 ppm. If the indicated free chlorine concentration is less than 10 ppm, repeat disinfection procedure until an approved result is obtained.
f. When the above procedure has been completed to the satisfaction of the Engineer, flush out entire system with fresh water until tests at all outlets show a residual of not more than 0.5 ppm.
3.04 SAMPLE COLLECTION AND TESTING
A. Chlorine Residual Testing
1. AWWA C651, Appendix A, DPD Drop Dilution Method, except where otherwise specified.
2. Testing shall be performed by the Contractor and witnessed by the City or Engineer.
B. Bacteriological Analyses of Water
1. After the completion of disinfecting procedure, including the final flushing, the testing laboratory personnel shall obtain water samples from the system for bacteriological analyses.
2. For each facility, follow the bacteriological sampling procedures described in the associated AWWA standard for disinfection of the facility.
3. Requirementsforsatisfactory disinfection of watersupply are that bacteriological analyses indicate that water samples are negative for coliform organisms, and that Heterotrophic plate count (standard plate count) is less than 100 colony forming units per milliliter.
McCandless Well Facility
4. If bacteriological analyses do not satisfy the above requirements, then repeat disinfection procedure at no additional cost to the City until these requirements are met.
3.05 DISPOSAL OF DISINFECTION SOLUTION
A. Disinfection solution may be dechlorinated to 1 to 2 mg per liter of free chlorine and discharged to the sanitary sewer. See Section 01560 for restrictions on discharge into the sanitary sewer.
B. Take care to assure that chlorinated water is not spilled into storm drains.
3.06 PROTECTIONOF DISINFECTED STRUCTURES
A. If required to re-enter a disinfected structure, the work shall be conducted utilizing techniques and work methods as necessary to maintain the disinfected status. This shall include use of disinfected foot coverings, tools, and the like.
B. In the event the disinfected facilities are contaminated, disinfection on a localized basis must be repeated at no additional cost to the City.
C. The Contractor shall be responsible for maintaining security of the disinfected facilities.
END OF SECTION
West Yost – December 2024 11500 - 6 City of Milpitas
270-30-23-22 Disinfection Well Upgrades Program
West Yost – December 2024
270−30−23−22
12350 − 1
Laboratory Casework
City of Milpitas
Well Upgrades Program
McCandless Well Facility
SECTION 12350
LABORATORY CASEWORK
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Furnish modular and custom laboratory casework, with molded epoxy resin laboratory top, sink, and related accessories. Include factory prefinishing and field installation by factory trained and supervised installers.
1.02 REFERENCED SECTIONS
A. The following Section is referenced in this Section
1. Section 01330 – Submittals
1.03 REFERENCES
A. SEFA – Scientific Equipment and Furniture Association B. UL – Underwriters Laboratories
1.04 SUBMITTALS
A. Comply with Section 01330.
B. Submit the following items:
1. Manufacturer’s Data: Manufacturer's data and installation instructions for each type of casework.
2. Shop Drawings
a. Prepared specifically for this project. Drawings to show laboratory furniture in plan and in elevation at scale: 1/2−inch equals 1 foot, or larger. Show all cutouts for electrical, mechanical, and plumbing fixtures and accessories. Show all dimensions. Furnish templates for proper location of accessories furnished and installed by other trades. Show location of backing required for attachment of cabinets. b. For furniture assemblies showing plans, elevations, ends, cross−secons, service run spaces, location and type of service fittings. Submit laboratory furniture manufacturer's details showing the following:
1) Top construction.
2) Drawer construction.
3) Corner and leg construction.
4) Cabinet construction.
5) Door construction.
6) Finish.
7) Hardware.
8) Accessories.
c. Coordinate shop drawings with other work involved.
West Yost – December 2024
270−30−23−22
12350 − 2
Laboratory Casework
City of Milpitas
Well Upgrades Program
McCandless Well Facility
d. Provide roughing−in drawings for mechanical and electrical services when required.
e. Call attention to itemsthat deviate from the project specifications.
3. Manufacturer's full line of standard color chips of casework and work surface finishes.
4. Certification indicating compliance with SEFA 8.
1.05 PERFORMANCE REQUIREMENTS
A. Worktop
1. Chemical Resistance: Tops shall resist chemical attacks from normally used laboratory reagents. Weight change of top samples submerged in the reagents* listed in the next paragraph for a period of seven daysshall be lessthan one−tenth of one percent, except that the weight change for those reagents marked with ** shall be less than one percent. (Tests shall be performed in accordance with A.S.T.M. Method D543−67 at 77˚F.)
Acetic Acid, Glacial Iso−Octane
Acetic Acid, 5% Kerosene
Acetone Methyl Alcohol
Ammonium Hydroxide, 28% Methyl Ethyl Ketone
Ammonium Hydroxide, 10% Mineral Oil
Aniline Oil Nitric Acid, 10%
Benzene Nitric Acid, 40%
Carbon Tetrachloride Nitric Acid, 70%**
Citric Acid, 10% Oleic Acid
Chromic Acid, 40%** Olive Oil
Cottonseed Oil Phenol, 5%
Dichromate Cleaning Solution** Soap Solution, 1%
Diethyl Ether Sodium Carbonate, 20%
Dimethyl Formamide Sodium Carbonate, 2%
Detergent Solution, 1/4% Sodium Chloride, 10%
Distilled Water Sodium Hydroxide, 1%
Ethyl Acetate Sodium Hydroxide, 10%
Ethyl Alcohol, 95% Sodium Hydroxide, 50%
Ethyl Alcohol, 50% Sodium Hypochlorite,5%
Ethylene Dichloride Sulfuric Acid, 3%
Heptane Sulfuric Acid, 30%
Hydrochloric Acid, 10% Sulfuric Acid, 85%
Hydrochloric Acid, 37% Toluene
Hydrogen Peroxide, 3% Transformer Oil
Hydrogen Peroxide, 28% Turpentine
West Yost – December 2024
270−30−23−22
12350 − 3
Laboratory Casework
City of Milpitas
Well Upgrades Program
McCandless Well Facility
2. Heat Resistance: A high form porcelain crucible, size 0, 15 ml capacity, shall be heated over a Bunsen burner until the crucible bottom attains an incipient red heat. Immediately, the hot crucible shall be transferred to the top surface and allowed to cool to room temperature. Upon removal of the cooled crucible, there shall be no blisters, cracks or any breakdown of the top surface whatsoever.
1.06 QUALITY ASSURANCE
A. Provide products of a single manufacturer regularly engaged in fabricating laboratory casework.
B. Furniture shall meet the performance requirements described in SEFA 8 and the best practices of the wood casework industry.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Solid Woods: Lumber to be kiln dried at manufacturer's plant to moisture content of 5 to 6%. Exposed exterior cabinet wood to be White Maple. Drawer sides and backs solid hardwood, clear and sound, unselected for color.
B. Plywoods: All plywood shall be hardwood plywood. Softwoods such as Fir or Pine are not permitted. Thickness as specified, consisting of cross and face plies glued with water resistant resin glue.
C. Banding: Plywood panels shall be edge banded as specified with 3mm hardwood edgebanding to match the plywood veneer.
D. Hardboard: Hardboard shall be a wood fiber/resinous combination formed with heat and pressure into sheets providing a hard, smooth surface.
E. Glue: Type II water resistant, with gluing done in clamps and jigs.
2.02 CASEWORK
A. General
B. Cabinets and cases to be of the size and configuration shown on the drawings and constructed as follows:
1. End Panels, Bottom, and Shelves: All cabinet end panels shall be 3/4" thick White Maple veener core plywood edge banded on exposed edges. End panels shall be multiple doweled, glued, and screwed to top frame members, intermediate rails, and bottoms. Cupboard bottoms shall be 3/4" thick White Maple veneer core plywood edge banded on exposed edge. All cupboard base cabinet shelves shall be full−width adjustable, 3/4" thick White Maple veneer core plywood edge banded on exposed edge. Integrally joined parts shall result in a totally enclosed cabinet.
2. Backs: Cabinet backs shall be 1/4" thick hardboard, dadoed into end panels and securely fastened to cabinet bottom and top back rail. Backs that are attached to end panels with cleats shall be unacceptable.
West Yost – December 2024
270−30−23−22
12350 − 4
Laboratory Casework
City of Milpitas
Well Upgrades Program
McCandless Well Facility
3. Top Frame: The cabinet top frame shall consist of a front rail and a back rail. The front rail shall be 3−1/8" x 1" hardwood with 3mm White Maple facing. The back rail shall be 2−1/2" x 3/4" hardwood plywood.
4. Intermediate Rails: Intermediate rails when specified shall be 3−1/4" x 3/4" hardwood plywood edge banded on exposed edge. Rails shall be multiple doweled and screwed to end panels. Intermediate rails shall be mounted at the front between the drawers and between all drawers and doors.
5. Drawers: Drawer sides, back, and sub−front shall be 1/2" thick, 9−ply Birch plywood. Drawer heads shall be 3/4" thick, White Maple, composite core plywood. A dovetail joint shall be used to attach the drawer sub−front and drawer back to the drawer sides. Drawer bottoms shall be 1/4" thick hardboard, set and hot−melt glued into 1/4" grooves, four sides. Each drawer shall have one pull mounted horizontally, drawers over 24" long shall have two pulls.
6. Doors: Swinging doors shall be 3/4", White Maple, composite core plywood edge banded on all four edges, mounted on cabinet with 1 pair of offset hinges and shall be latched with a roller catch. Double doors without locks shall have a roller catch on each door. Double doors with locks shall have an elbow catch mounted on the left−hand door and the lock and a roller catch mounted on the right−hand door. Each door shall have one pull mounted vertically.
2.03 HARDWARE AND TRIM
A. Drawer and Door Pulls: Drawer and door pulls shall be mounted on 4" centers, offering a comfortable hand grip, and be securely fastened to doors and drawers. They shall be manufactured from anodized aluminum in a shallow rounded shape.
B. Flush Pulls: Flush pulls for sliding doors shall be satin finish chrome, providing a recessed finger grip. Finger holes or slots machined into doors shall be unacceptable.
C. Hinges: Hinges shall be the five (5) knuckle, satin finish stainless steel, institutional, offset type for allswinging doors. Hinges shall be 2−3/4" long, and secured to cabinet and doors with flathead screws, so applied to withstand a weight load of 150 lbs. minimum.
D. Roller Catches: Roller Catches shall have a spring−loaded polyethylene roller and a steel strike plate.
E. Elbow Catches: Elbow catches and strike plates shall be cast aluminum with bronze finish.
F. Drawer Slides: Drawer slides shall be zinc plated, cold rolled steel, full extension, linear ball bearing slides rated at 100 pounds minimum. The drawer shall be removable without the use of tools.
G. Dowels: Dowels used to join frames and panels shall be fluted hardwood not less than 8mm in diameter.
H. Shelf Support Clips: Shelf support clips shall be twin pin type for mounting on interior of cabinet end panels. Clips shall be corrosion resistant and shall retain shelves from accidental removal and tipping. Shelves shall be adjustable on 32mm centers. Surface mounted metal support strips and clips subject to corrosion are not acceptable.
I. Sink Supports: Sink Supports, where required, shall be of a cradle type consisting of two 1−1/4" x 1−3/4" horizontal cleats and adjustable leveling bolts or glides. The horizontal
West Yost – December 2024
270−30−23−22
12350 − 5
Laboratory Casework
City of Milpitas
Well Upgrades Program
McCandless Well Facility
cleats shall be supported by two 3/4" x 2−1/2" hardwood plywood cleats attached to the cabinet end panels, or by four 1/4" steel rods attached to the cabinet top frame.
J. Support Struts: Supportstrutsshall consist of two 16 gauge channel uprightsfastened top and bottom by two adjustable "U" shaped spreaders, each 12 gauge, 1−1/2" x length required. Struts shall be furnished to support drain troughs, and to support work top at plumbing space under fume hood superstructures or other heavy loads. They shall be fabricated so as to accept industry standard, pipe and conduit hangers.
2.04 WORK SURFACES
A. Molded Epoxy Resin
1. Manufacturers: "Kemresin" by Kewaunee Scientific Corporation; United Lab Equipment, or equal.
2. Epoxy Resin tops shall consist of modified epoxy resin that has been especially compounded and cured to provide the optimum physical and chemical resistance properties required of a heavy−duty laboratory table top. Tops and curbs shall be a uniform mixture throughout their full thickness, and shall not depend upon a surface coating that is readily removed by chemical and/or physical abuse.
3. Material shall be resistant to acids, alkalis, salts and solvents. Physical properties and performance test results for heat resistance, chemical resistance, and 24− hour chemical spot test shall be equivalent to or better than the named product of the first−named manufacturer.
4. Topsshall be 1" thick minimum, exposed edges beveled top and bottom, and drip grooves provided on the underside at all exposed edges. 4" high curbs at the backs and ends of tops shall be 1" thick and bonded to the deck to form a square watertight joint. All joints shall be made with a highly chemical and corrosion resistant cement having the same properties as the base material. Drip grooves shall be provided on the underside of all exposed edges of tops installed on units or assemblies containing sinks.
5. Tops and curbs shall be non−glaring.
6. Sink cutouts shall be smooth and uniform without saw marks with the top edge beveled. The bottom edge of the sink opening shall be finished smooth with the edge broken to prevent sharpness. Corners of sink cutouts shall be radiused not less than 3/4".
2.05 LABORATORY FIXTURES AND ACCESSORIES
A. Sink
1. Modified epoxy resin, heat−formed into one piece construction having rounded corners and 1−1/2−inch acid resistant polyethylene outlet with strainer.
2. Size as shown on Drawings.
3. Provide sink support frames and all required clampsfor field installation.
4. Manufacturers: Kewaunee "Kemresin;" Hamilton modified epoxy 20L202; or equal.
West Yost – December 2024
270−30−23−22
12350 − 6
Laboratory Casework
City of Milpitas
Well Upgrades Program
McCandless Well Facility
B. Sink Trap
1. Polyethylene, "P" drum type, 1−1/2−inch diameter minimum.
2. Manufacturers: Kewaunee; Hamilton; or equal.
PART 3 - EXECUTION
3.01 DELIVERY, STORAGE AND HANDLING
A. Protect laboratory casework prior, during and after installation to assure equipment's acceptability at the time of completion.
B. Deliver materials in labeled, unbroken packages and crates as factory sealed. Store materials as recommended by the manufacturer. Take care in handling equipment to prevent damage.
C. Building must be enclosed and heating/air conditioning system in operation for at least five days prior to delivering laboratory casework.
3.02 PREPARATION
A. Coordinate all work under this Section with all other trades whose work adjoins, combines, or aligns with same. Take such field measurements as may be required. Report any major discrepancy between drawings and field dimensions, and secure directions before proceeding.
B. Verify that all blocking and backing are properly located before wall finishes are in place.
C. Inspect all surfacesto receive casework and report all defects before proceeding.
3.03 INSTALLATION
A. Set casework in place, scribe plumb, square and level and secure to structure in position indicated with all required fastenings, clip angles, bases, anchors, nailing, blocking, shimming and other fittings.
B. Provide all closures, fillers and scribe strips required to provide a neat and finished installation. All such exposed items shall match casework.
C. Furnish all miscellaneous metal supports, clips, anchors, fasteners and bracings required for installation.
1. Anchor wall cabinets with a row of fasteners near the top and a row near the bottom of cabinets. Use 1/4−inch−diameter wood screws spaced 16 inches on centers maximum, into solid backing.
2. Anchor base cabinets to wall with a row of fasteners near the top of cabinets spaced 16 inches on centers into solid backing. Anchor to floor with a row of drilled expansion bolts into concrete floor, spaced 16 inches on centers maximum.
3. Anchor island (free standing) base cabinets with drilled expansion anchor bolts all around the perimeter of cabinets spaced 16 inches on centers maximum.
D. Adjust all doors, drawers and other moving parts to operate freely without binding or sticking, adjacent items level, vertical lines plumb and aligned, clearance uniform.
West Yost – December 2024
270−30−23−22
12350 − 7
Laboratory Casework
City of Milpitas
Well Upgrades Program
McCandless Well Facility
E. Field fit composition worktops, splashes and utility curbs to job conditions after cabinets are in place. Attach cabinets with concealed fasteners from inside of cabinets.
END OF SECTION
McCandless Well Facility
(THIS PAGE LEFT BLANK INTENTIONALLY)
West Yost – December 2024 12350 − 8 City of Milpitas
270−30−23−22 Laboratory Casework Well Upgrades Program
JDH – August 2024
270-30-23-22
13111 - 1
Galvanic Cathodic Protection for Buried Pipes
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 13111
GALVANIC CATHODIC PROTECTION FOR BURIED PIPES
PART 1 - GENERAL
1.01 SCOPE
A. The Contractor shall furnish all materials, install all equipment and provide all labor necessary to complete the work shown on the drawings and or listed below and all other work and miscellaneous items not specifically mentioned but reasonably inferred, including all accessories and appurtenances required for a complete system. The intent of this specification is to provide for a complete, functional cathodic protection system for the ductile iron pipe and fittings for the City of Milpitas, Well Upgrade Program, McCandless Well Facility.
1.02 WORK INCLUDED
A. Work included in this section consists of the components of the cathodic protection system, including anodes, cables, insulating joints, test stations and any other work necessary to complete the installation. A partial list of work included is as follows:
1. Cathodic protection with high potential magnesium anodes for ductile iron pipe and fittings associated with the referenced project.
2. Encasement of all ductile iron pipe, and fittings associated with the referenced water pipelines in polyethylene.
3. Bonding of buried, non-welded, (non-insulating) ductile iron pipe and fittings’ joints.
4. Trenching, drilling, and other excavation.
5. Installation of anodes, cables and test stations.
6. Backfill and compaction of backfill.
7. Provide shop drawings, reports, permits, and obtain Engineer's approval where required.
8. Correction of all deficiencies.
9. Cleanup and restoration of surface.
B. The work shall include the provision of all materials, equipment, and apparatus not specifically mentioned herein or noted on the plans, but which are obviously necessary to complete the work specified.
1.03 QUALITY ASSURANCE
A. General
1. All work shall be performed to the satisfaction of the Engineer.
B. MATERIALS
1. The Contractorshall notsubstitute forthe specifiedmaterials unless approved by the Engineer.
JDH – August 2024
270-30-23-22
13111 - 2
Galvanic Cathodic Protection for Buried Pipes
City of Milpitas
WellUpgrades Program
McCandless Well Facility
C. TESTING
1. Electrical continuity of the fittings, proper operation of anodes, test leads and all other cathodic protection components shall be tested by the Project Corrosion Consultant, in order to ensure proper installation and operation. The Contractor shall be responsible for correction of all deficiencies identified by the testing and all costs incurred for retesting prior to final acceptance.
D. COMPACTION
1. Compaction of backfill for anodes and trenches shall match the existing conditions and shall be approved by the Engineer.
1.04 REQUIREMENTS
A. All buried ductile iron pipes, fittings and appurtenances associated with the water lines shall be encased in 8-mil polyethylene per AWWA C-105.
B. Galvanic cathodic protection shall be installed on all buried pressurized metallic pipe, fittings and appurtenances.
C. All rubber gaskets, mechanical joints and flexible couplings shall be bonded along the entire buried length of ductile iron pipe.
D. The test station shall be installed at the location designated on the drawings.
1.05 CODE REQUIREMENTS
A. All materials, workmanship, and installation shall conform to all requirements of the legally constituted authority having jurisdiction. These authorities include, but are not limited to, the latest revision of the State of California, Department of Industrial Relations, Division of Industrial Safety Orders of the Industrial Accident Commission, and all other applicable State, County, or City standards and regulations. Nothing in the drawings or specifications is to be construed to permit work not conforming to these regulations and codes. Where largersize or better grade materialsthan required by these regulations and codes are specified, the specifications and drawings shall have precedence.
1.06 REFERENCES
A. This section contains references to the following documents. They are a part of this section as specified and modified. In case of a conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail.
1. American Society of Testing and Materials (ASTM)
2. National Electrical Manufacturers Association (NEMA)
3. American Water Works Association (AWWA)
4. National Association of Corrosion Engineers (NACE)
5. American National Standards Institute (ANSI)
1.07 CONTRACTOR SUBMITTALS
A. Prior to commencing work, submit copies of the following items in accordance with Section 01330, Submittals:
JDH – August 2024
270-30-23-22
13111 - 3
Galvanic Cathodic Protection for Buried Pipes
City of Milpitas
WellUpgrades Program
McCandless Well Facility
1. A complete list of cathodic protection equipment and material, including name and manufacturer, catalog number, size, finish and any other pertinent data necessary for proper identification and to determine conformance with specifications. These items include but are not limited to:
a. High Potential Magnesium Anodes
b. Cables
c. Exothermic Welding Equipment and Supplies
d. Cable-To-Pipe Coating Material
e. Traffic Boxes
f. Terminal Boxes, Shunts and Hardware
g. Cable Identification Tags
h. Cable Warning Tape
i. Bitumastic Coating
j. Polyethylene for Encasement of Ductile Iron Pipe and Fittings pipe. k. Insulating Flange Kits
1.08 INTERFERENCE AND EXACT LOCATIONS
A. The Contractor shall coordinate and properly relate this work to the site and to the work of all trades. The general locations of the facilities are shown on the drawings. However, the Contractor shall visit the premises and thoroughly familiarize himself with all details of the work and working conditions, verify existing conditions in the field, determine the exact locations of existing pipelines and structures and advise the Engineer of any discrepancy that may prevent or hinder the specified work from being completed. The Contractor shall be solely responsible for location and marking underground structures so as to avoid damage during construction.
PART 2 - MATERIALS
2.01 GENERAL
A. All materials shall conform to the requirements set forth herein or as designated on the drawings, unless otherwise specified. All materials must be new, free from defects, and shall be of the best commercial quality for the purpose specified. The Contractor shall furnish all necessary items and accessories notshown on the drawings orspecified herein, but which are required to fully carry out the specified intent of the work, without additional cost to the City.
2.02 MAGNESIUM ANODES
A. Magnesium Anodes: H-1 alloy with chemical composition and bare anode weight as indicated below.
B. Open Circuit Anode Potential –1.7 VDC versus copper-copper sulfate reference electrode.
C. Each anode shall conform to the following chemical composition:
1. Magnesium anodes shall be of the High Potential alloy with composition as indicated below. Each anode shall be cast with a steel core and the core shall protrude from one end and shall be of sufficient length to permit attachment of
JDH – August 2024
270-30-23-22
13111 - 4
Galvanic Cathodic Protection for Buried Pipes
City of Milpitas
WellUpgrades Program
McCandless Well Facility
a lead wire. Each anode shall conform to the following chemical composition and dimensions:
Chemical Composition
Silicon 0.30% Max.
Aluminum 5.0 - 7.0% Max.
Manganese 0.15% Min.
Iron 0.03% Max.
Nickel 0.003% Max.
Copper 0.1% Max.
Zinc 2.0 - 4.0% Max.
Total Other Impurities 0.30% Max.
Magnesium Balance
D. Bare Anode Dimensions:
Nominal Wt. Bare (lbs) Height
(inches)
Width
(inches)
Length
(inches)
17 3.5 3.75 25
32 5.5 5.75 20
E. Each anode shall be furnished with a lead wire attached to one end of the steel core, and the wire shall be of sufficient length to attach to the header cable as shown on the drawings. The wire shall be connected to the steel core by silver soldering, and the connection shall be mechanically secured before soldering. The entire connection shall be insulated with an electrical potting compound. The cable attached to the anode shall be No. 10 AWG, Type THHN or THWN stranded, single conductor copper.
F. The anode shall be prepackaged in a permeable cloth bag filled with a mixture of 75% ground hydrated gypsum, 20% powdered bentonite, and 5% anhydrous sodium sulfate.
Backfill shall have a grain size so that 100% is capable of passing through a 100-mesh screen. The mixture shall be firmly packed around the anode within the cloth bag by means of adequate vibration so that the magnesium ingot is completely surrounded with a minimum 1 inch of backfill material.
G. Manufacturers, or approved equal
1. Corrpro Companies, Inc.
2. Farwest Corrosion Control Company
2.03 CABLES
A. Cables used for joint bonding shall be single conductor, stranded copper, Type CP, insulated for 600 volts with High Molecular Weight Polyethylene (HMWPE) in accordance with the requirements of ASTM D 1248, Type 1, Class C, Grade 5.
JDH – August 2024
270-30-23-22
13111 - 5
Galvanic Cathodic Protection for Buried Pipes
City of Milpitas
WellUpgrades Program
McCandless Well Facility
B. All cables for anodes and test stations shall be Type THHN or THWN, stranded, copper, sized as shown on the drawings, conforming to Federal Specification J-C-30. The color of the insulation shall be as indicated on the Drawings.
2.04 CABLE-TO-PIPE CONNECTIONS
A. All cable connections to the ductile iron pipe or fittings shall be accomplished utilizing an exothermic welding process such as "Cadweld" by Erico Products, Inc., "Thermoweld" by Continental Industries, Inc., or approved equal. Each cable shall be fitted with a copper sleeve for accomplishing the weld and cartridge, sleeves and moldsfor each weld shall be furnished by the same manufacturer. All materials for welding shall be sized and in accordance with recommendationsin manufacturers' literature. Exothermic weldsfor the ductile iron fittings shall be made using the weld metal for cast iron pipe.
2.05 CABLE-TO-PIPE COATING MATERIAL
A. Coating material for cable-to-pipe connections shall be Handy Caps & primer as manufactured by Royston products or Propoxy 20 epoxy putty as manufactured by the Hercules Chemical Company or approved equal.
2.06 TEST STATION
A. Ground level test stations shall be Christy G5 traffic box with a cast iron lid as shown on the drawing. The cover shall be manufactured with "CP-TEST" markings for easy identification.
2.07 TERMINAL BOXES
A. Terminal Box: High impact molded Lexan plastic, Model "T-3" as manufactured by Tinker & Rasor, or approved equal. The test box shall be provided with sufficient hardware and binding post terminalsfor each cable asshown on the drawings. All teststation hardware, including nuts, bolts and shorting straps shall be nickel-plated brass. Terminal Boxes for the anode test stations shall be supplied with 8 amp, 0.01 ohm shunts.
2.08 CABLE IDENTIFICATION TAGS
A. All cables in the terminal boxes shall be identified. The identification tags shall be white plastic "zip-tie" type straps with a plastic tab of sufficient size to allow the pipeline station to be written on the tab with a permanent felt tip marker.
2.09 CABLE WARNING TAPE
A. All buried test station and anode cables shall have plastic warning tape installed a minimum of 12 inches above the top of the cables for the entire buried length of the cables. The warning tape shall be 4 inches wide and shall be yellow with black lettering with the legend "CAUTION, CATHODIC PROTECTION CABLES BURIED BELOW" in 3 inches high lettering printed at a minimum of seven foot intervals along the entire buried length of the cable.
2.10 BITUMASTIC COATING
A. Coating for all buried bolts, nuts and metallic washers of the ductile iron pipe and the copper insulating corporation stops shall be Bitumastic 300M coal tar mastic coating, as manufactured by Carboline or approved equal.
JDH – August 2024
270-30-23-22
13111 - 6
Galvanic Cathodic Protection for Buried Pipes
City of Milpitas
WellUpgrades Program
McCandless Well Facility
2.11 POLYETHYLENE SHEETS FOR PIPE ENCASEMENT
A. The polyethylene sheets used for encasement of the ductile iron pipe and fittingsshall be minimum 8-mils thick in accordance with AWWA C-105.
2.12 INSULATING FLANGES
A. Insulating flanges shall be installed to electrically isolate the water pipeline from existing pipelines or piping inside of the building. The insulating flange kit shall be suitable for water service, and shall comply with NSF-61, such as LineBacker 61 manufactured by PSI or Trojan G-10 w/EPDM seal manufactured by APS, suitable for wet and dry locations.
Each insulating flange set shall consist of a full-face central gasket, a full-length sleeve for each flange bolt, and two insulating washers with two steel washers for each bolt. The full-face type central gasket shall be 1/8-inch thick sheet packing, having a dielectric constant of 300 volts per mil, minimum. Bolt sleeves shall be fabric reinforced phenolic resin or mylar and insulating washers shall be constructed of fabric reinforced phenolic resin. The complete assembly shall have an ANSI pressure rating equal to that of the flanges between which it is installed.
PART 3 - EXECUTION
3.01 GENERAL REQUIREMENTS
A. All materials, workmanship and installation shall conform to all requirements of the legally constituted authority having jurisdiction. These authorities include, but are not limited to, the latest revision of the State of California, Department of Industrial Relations, Division of Industrial Safety, Electrical Orders; The National Electric Code, General Construction Safety Orders of the Industrial Accident Commission; and all other applicable State, Contra Costa County, or Dublin San Ramon Service District standards and regulations. Nothing in the drawings or specifications is to be construed to permit work not conforming to these regulations and codes. Where larger size or better grade materials than required by these regulations and codes are specified, the specifications and drawings shall have precedence.
3.02 STORAGE OF MATERIALS
A. All materials and equipment to be used in construction shall be stored in such a manner to be protected from detrimental effectsfrom the elements. If warehouse storage cannot be provided, materials and equipment shall be stacked well above ground level and protected from the elements with plastic sheeting or other method as appropriate.
3.03 ANODES
A. Anodes shall be installed in the trench horizontally or vertically in native soil, after excavation to proper depth, equal to the bottom of the pipeline or casing, a minimum of 3 feet from fittings and a minimum of 5 feet from the pipelines. Spacing between anodes shall be 5 feet (minimum) if multiple anodes are installed at a single test station location.
Prior to placing anodes in the trench or hole, paper or plastic bags shall be removed, but the cloth bag shall remain around the anode. Care shall be exercised during installation to prevent damage to the cloth bag and loss of backfill material. After placing anodes in the trench, native soil, free of rocks and other foreign objects shall be placed around the anode to a minimum cover of one foot above the anode. Remainder of the trench shall
JDH – August 2024
270-30-23-22
13111 - 7
Galvanic Cathodic Protection for Buried Pipes
City of Milpitas
WellUpgrades Program
McCandless Well Facility
then be backfilled with native soil. During installation, anodes shall not be supported or handled by use of attached wires.
B. The size of anodes to be installed at each test station is designated on the drawings.
3.04 CABLES
A. Cables buried in the ground shall be installed in PVC conduit and shall be laid straight, without kinks. The cable shall have a minimum cover of 30 inches. Each cable run shall be continuousin length and free of joints or splices unless shown on the drawings. Care shall be exercised during installation to avoid punctures, cuts, and similar damage to insulation.
Any damage to insulation will require replacement of the entire cable length. Backfill surrounding the cables shall be native soil free of foreign materials. Cable warning tape shall be installed 12-inches above the entire buried length of the cable.
3.05 CABLE-TO-PIPE CONNECTIONS
A. Cable-to-pipe connections to the ductile iron and steel pipe shall be installed in the manner and at the locations shown on the drawings. Coating materials shall be removed from the pipe surface over an area just sufficient to make the connections. The surface shall be cleaned to white metal by grinding or filing prior to welding the conductor.
Grinding with resin-impregnated wheels shall not be allowed. The conductor shall be welded to the pipe by the exothermic process with a copper sleeve fitted over the conductor, and only sufficient insulation shall be removed from the conductor to allow placing in welding mold. After the weld has cooled, allslag shall be removed and the weld shall be tested with a sharp blow from a 22-ounce hammer to assure proper metallurgical bond. All defective welds shall be removed and replaced. All exposed surfaces of copper and steel shall be covered with a minimum thickness of 1/4 inch of insulating materials as shown on the drawings. The cable to pipe connections shall be tested with a low resistance ohmmeter by the Contractor and approved by the City’s Agent prior to backfill.
Cable to pipe connections backfilled prior to testing shall be rejected.
B. All exposed surfaces of copper and ductile iron or steel shall be cleaned of contaminants and covered with a minimum thickness of 1/4 inch of insulating materials as shown on the drawings. As an alternative the exposed metal and surrounding surface shall be cleaned of contaminants and coated with Royston Roybond 747 primer. After the primer has dried, the Royston Handy Cap shall be applied.
3.06 TEST STATIONS
A. Test stations shall be installed at locations designated on the drawings and at all anode installation locations. Leave a minimum of 18 inches of slack for each cable at each test station housing. Slack shall be that amount of wire which, when the cover isremoved and the wire extended, protrudes beyond the opening of the box or enclosure. Strip insulation from the cable end to make metal-to-metal connection to each binding post of the terminal box. The terminal end of each cable shall be identified with the structure identification using the permanent cable identification tags. Test stations shall be installed in sidewalks or non-traffic areas for easy access for future testing.
3.07 JOINT BONDING
A. All non-welded rubber gasket joints, mechanical joints, flange joints and threaded joints shall be bonded with a HMWPE stranded copper cable sizes as shown on the drawings.
JDH – August 2024
270-30-23-22
13111 - 8
Galvanic Cathodic Protection for Buried Pipes
City of Milpitas
WellUpgrades Program
McCandless Well Facility
The overall length of the conductor shall permit maximum movement of the pipe joint without transferring any tensile stress to the cable, per pipe manufacturer’s recommendations. The bonded pipe sections shall be tested for continuity, prior to backfilling.
3.08 FIELD COATING OF BURIED FLANGE HARDWARE
A. All buried nuts and bolts shall be coated with bitumastic prior to polyethylene encasement. After flange hardware isinstalled use wire brush, power brush or an abrasive cleaning pad to remove all loose material, dirt and grime from substrate to a minimum cleanliness of SSPC SP2. Apply Bitumastic coating liberally with a medium bristle brush to the extent that all surfaces are completely covered with no bare spots visually evident.
Coat exposed surfaces of bolts, washers and nuts, giving special attention to the bottomside surfaces. Follow the manufacturer's recommendations for drying times required before polyethylene encasement and backfill.
3.09 POLYETHYLENE ENCASEMENT OF PIPES AND FITTINGS
A. The buried ductile iron pipe, fittings, and flexible expansion joints shall be encased in minimum 8-mils thick polyethylene in accordance with AWWA C-105.
3.10 INSULATING FLANGED JOINTS
A. All insulating components of the insulating flanged gasket set shall be cleaned of all dirt, grease, oil and otherforeign materialsimmediately prior to assembly. Bolt holesin mating flanges shall be properly aligned at the time bolts and insulating sleeves are inserted to prevent damage to the insulation. After flanged bolts have been tightened, each insulating washer shall be inspected for cracks or other damage. All damaged washers shall be replaced. After assembly, resistance between each bolt and flange shall be measured with an approved ohmmeter, and the minimum resistance shall be 50,000 ohms. Where the insulating joint is assembled in the shop and shipped as a unit, resistance shall be measured in the shop between the flanges and between each bolt and flange and shall meet the above requirements. In addition, the completed assembly shall be tested with a flange insulation tester such as Gas Electronics Model 601, or equal for the integrity of the insulation. In case where the insulating flange is assembled in the field the completed assembly shall be tested with a flange insulation tester such as Gas Electronics Model 601, or equal prior to acceptance
3.11 ENERGIZING AND TESTING
A. After installation of sacrificial anode system, and prior to paving, conduct testing to verify proper operation of the cathodic protection system. Testing shall be conducted by the Project Corrosion Engineer (JDH Corrosion Consultants, Inc. (925)927-6630). Any and all deficiencies shall be corrected by the Contractor at his cost and retested prior to final acceptance. All retesting shall be at the Contractor's expense.
END OF SECTION
JDH – August 2024
270-30-23-22
13112 - 1
Tank Internal
Cathodic Protection System
City of Milpitas
WellUpgrades Program
McCandless Well Facility
SECTION 13112
TANK INTERNAL CATHODIC PROTECTION SYSTEM
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. The Contractor shall furnish all materials, install all equipment and provide all labor necessary to complete the work shown on the drawings and/or listed below and all other work and miscellaneous items not specifically mentioned but reasonably inferred, including all accessories and appurtenances required for a complete system. The intent of the specification isto provide for a complete, functional cathodic protection system for the submerged interior surfaces of the steel tank for the City of Milpitas, Well Upgrade Program, McCandless Well Facility.
B. Work included in thissection consists of all components ofthe cathodic protection system for the steel storage tank including magnesium anodes, cables, junction box, reference electrode and any other work necessary to complete the installation.
1. Coordinate the installation of new conduit, mounting channel for the test station, and drilled holes for the conduit entry and for access holes and bolts at the access holes with the coatings contractor.
2. Cathodic protection of the submerged portion of the tank interior surfaces.
3. Installation of magnesium anodes, cables, a reference cell, access hole covers, conduit, mounting channel, and anode test station.
4. Material submittals.
5. Coatings for conduit and repair of damaged coatings on the tank shell and roof.
6. Correction of all deficiencies.
C. Anodes, anode lead wires, header cables and conduit lengths shown on the plans are approximate only. Actual lengths are the responsibility of the Contractor and shall be based on installation requirements.
1.02 REFERENCED SECTIONS
A. The following Sections are referenced in this Section:
1. Section 01330 – Submittals
1.03 REFERENCES
A. This section contains references to the following documents. They are a part of this section as specified and modified. In case of a conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail.
1. National Association of Corrosion Engineers (NACE):
a. SP-0196-2011 – Galvanic Anode Cathodic Protection of Internal Submerged Surfaces of Steel Water Storage Tanks
2. American National Standards Institute (ANSI):
a. C80.1-2015 – Electrical Rigid Steel Conduit, Zinc Coating
JDH – August 2024
270-30-23-22
13112 - 2
Tank Internal
Cathodic Protection System
City of Milpitas
WellUpgrades Program
McCandless Well Facility
3. American Society for Testing and Materials (ASTM):
a. D-1248-12 – Polyethylene Plastics Extrusion Materialsfor Wire and Cable
4. American Water Works Association (AWWA)
a. C-652-11 – Disinfection of Water Storage Facilities
5. National Electrical Manufacturers Association (NEMA):
a. 250-2008 – Enclosures for Electrical Equipment (1,000 V Maximum) b. TC-2-2013 – Electrical Polyvinyl Chloride (PVC) Conduit
6. National Sanitation Foundation (NSF):
a. NSF/ANSI 61-2013 – Drinking water system components - Health effects
7. Underwriter's Laboratories, Inc. (U.L.):
a. 6-2007 – Electrical Rigid Metal Conduit - Steel
b. 83-2014 – Thermoplastic - Insulated Wires and Cables c. 510-2005 – Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape d. 514A-2013 – Metallic Outlet Boxes
1.04 SUBMITTALS
A. Submittalsshall be furnished in accordance with Section 01330
1. A complete list of cathodic protection equipment and material, including name and manufacturer, catalog number, size, finish and any other pertinent data necessary for proper identification and to determine conformance with specifications.
2. Certification by the cable manufacturer, covering conformance of cable insulation to the designated specification.
3. A certified test report showing the chemical analysis of all anodes.
4. System warranty pursuant with Paragraph 1.09.
5. Coating manufacturer’s data sheet for each product to be used along with instructions and recommendations for surface preparation and coating application for galvanized steel surfaces as well as for touchup of steel surfaces.
6. Materialsafety data sheet for each field applied coating product used.
7. Sanitization procedure for all items entering the inside of the tank.
8. Proposed installation schedule.
B. Contractorshall receive written approval of submittals, prior to beginning installation.
1.05 QUALITY ASSURANCE
A. All work shall be performed to the satisfaction of the Engineer.
B. The Contractor shall not substitute for the specified materials unless approved by the Engineer.
C. Use only new, highest quality cathodic protection components, and standard products from a manufacturer regularly engaged in the production ofsuch material or equipment.
JDH – August 2024
270-30-23-22
13112 - 3
Tank Internal
Cathodic Protection System
City of Milpitas
WellUpgrades Program
McCandless Well Facility
D. All materials in contact with the water or exposed to the interior of the tank shall be classified in accordance with ANSI/NSF 61 “Drinking Water Systems Components.” E. Cathodic protection components shall be subject to testing by the City’s Engineer to ensure proper installation and operation. The Contractor shall be responsible for correction of all deficiencies identified by the testing and all costs incurred for retesting prior to final acceptance.
1.06 DELIVERY STORAGE AND HANDLING
A. All materials and equipment to be used in construction shall be stored in such a manner to be protected from detrimental effectsfrom the elements. If warehouse storage cannot be provided, materials and equipment shall be stacked well above ground level and protected from the elements with plastic sheeting or other method as appropriate.
B. Replace any damaged anodes, and any damaged lead wires.
1.07 CONTRACTOR QUALIFICATIONS
A. The cathodic protection installer shall have a minimum of five (5) years’ experience installing and servicing the types of system described in this specification. The system shall be installed by the cathodic protection installer with staff, trained in the installation of waterworks and related cathodic protection systems.
B. All personnelshall be subject to Federal Substance Abuse and Testing Regulations.
1.08 PROJECT CONDITIONS
A. The Contractor shall coordinate and properly relate this work to the site and to the work of all trades. The general locations of the facilities are shown on the drawings. However, the Contractor shall visit the premises and thoroughly familiarize himself/herself with all details of the work and working conditions, verify existing conditions in the field, determine the exact locations of existing structures and advise the Engineer of any discrepancy that may prevent or hinder the specified work from being completed.
1.09 WARRANTY
A. The system will be energized for its permanent system activation following the one-year warranty coating inspection. The system warranty shall be no less than one year after permanent system activation and shall include all costs for repair, parts and labor.
PART 2 - PRODUCTS
2.01 GENERAL
A. All materials shall conform to the requirements set forth herein or as designated on the drawings, unless otherwise specified. All materials must be new, free from defects, and shall be of the best commercial quality for the purpose specified. The Contractor shall furnish all necessary items and accessories notshown on the drawings orspecified herein, but which are required to fully carry out the specified intent of the work, at no additional cost to the City.
2.02 MAGNESIUM ANODES
A. Galvanic anodes shall be high potential, extruded, magnesium with a diameter of 1.3- inches, length and weight as shown on the drawings. Each anode shall be cast with a 1/8-