GP-21
Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the AGENCY for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the AGENCY does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

The following subsection(s) are hereby added to Section 5-7 of the Standard Specifications:

5-7.9 Traffic and Access.

The Contractor shall notify the occupants of all affected properties in writing at least forty-eight (48) hours (2 working days) prior to any temporary obstruction of access. Contractor to revise all dates daily on no-parking signs. If works does not begin on the date posted on the no-parking sign, Contractor then shall replace all signs with the new correct dates. Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.

At least one twelve-foot-wide traffic lane shall be provided for each direction of travel onall streets at all times except as permitted by the Engineer. The Contractor must submit a traffic control plan to the City and obtain approval of same in writing from the City Engineer. The Contractor shall maintain at least one lane of traffic in each direction at all times during construction. The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).

There are some driveways that require replacement in order to be handicap compliant. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.

All driveways have to be open for access during project non -construction hours and days which may require use of plating and other devices or methods.

No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.

Under situations of driveway closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in

Page 339 of 805 ends

GP-22
the curb lane behind the K-rail. Any and all devices such as plates, barricades, K -rails andnotices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the City.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.

5-7.9.1 Street Closures, Detours, Barricades.

This subsection is hereby added to section 5 -7.9 of the Standard Specifications:

Street closures will not be allowed except as specifically permitted by the Engineer.

At the Pre -Construction meeting, the Contractor shall submit to the Engineer a detailed written plan for traffic control and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.

Traffic lane transitions shall not be sharper than a taper of thirty to one.

Temporary traffic channelization shall be accomplished with barricades, K -rail sections or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer.

The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finish pavement surfaces.

In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.

The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.

If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor, and deduct same from the next progress payment

Page 340 of 805 ends

GP-23
5-7.9.2 Protection of the Public.

This subsection is hereby added to section 5-7.9 of the Standard Specifications:

It is part of the service requ ired of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the City does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK

6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s proposed Construction Schedule shall be submitted to the Engineer within ten working days after the date of the Agency’s execution of the Contract Agreement. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.

Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed Construction Schedule and delivery dates, arrange utility coordination, discuss construction methods, and clarify inspection procedures.

The Contractor shall submit periodic Progress Reports to the Engineer by the last day of each month. The Report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.

Page 341 of 805 ends

GP-24
6-3 TIME OF COMPLETION.

6-3.1 General.

This subsection of the Standard Specifications shall be replaced by the following:

All construction work is to be completed within one-hundred and twenty (120) working days. 6-3.2 Contract Time Accounting.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s activities shall be confined to the hours between 7:00 a.m. and 3:30 p.m., Monday through Friday, excluding holidays, for daytime work and to the hours between 8:00 p.m. starting Monday and 5:00 a.m. ending Saturday, excluding holidays, for nighttime work (Night Work Requires The City Engineer Approval). Deviation from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead, and travel time. The service fees will be deducted from any amounts due the Contractor. Should the Contractor choose nighttime work, any and all lighting and traffic control, as needed, shall be provided by the Contractor.

6-9 LIQUIDATED DAMAGES
The liquidated damages value is hereby amended to be $500.00 per day.

SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT
7-3.2 Partial and Final Payment.

The text of Subsection 7-3.2 of the Standard Specifications is hereby deleted and replaced with the following:

The closure date for the purpose of making partial progress payments will be on or about the twenty-fifth (25th) day of each month. The Contractor shall prepare the approximate measurement of the work performed through the closure date and submit it to the AGENCY for approval along with an updated construction schedule.

When the work is complete, the Engineer will determine the final quantities of the work performed and prepare the final progress payment.

Payments are commonly authorized and made within forty-five days following the last day of the month submitted. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents. In addition, the final progress payment will not be released

Page 342 of 805 ends

GP-25
until the Contractor returns the control set of Plans and Specifications showing the as-built conditions and any other required documents.

A full five percent (5%) retention will be deducted from all progress payments. The final retention will be authorized for final payment forty-five (45) days after the date of recordation of the Notice of Completion.

Decisions to Withhold Progress Payments

The Engineer may withhold or nullify the requested Progress Payments in whole or in part due to the Contractor to such extent as may be necessary to protect the City from loss as a result of because of any of the circumstances listed below:

1. Defective work not remedied in accordance with provisions of the Contract Documents;

2. Third party claims, liens or stop notices filed or reasonable evidence indicating probable filing of such claims, liens or stop notices;

3. Failure of the Contractor to make payments properly for labor, services, materials, equipment, or other facilities or to subcontractor;

4. A reasonable doubt that the work can be completed for the unpaid balance of the Contract Sum;

5. A reasonable doubt that the Contractor will complete the work within the agreed Contract Time;

6. Costs to the Owner resulting from failure of the Contractor to complete the work within the stipulated time, or in accordance with the terms of the contract;

7. Damage to other work or property;

8. Failure to fulfill all the requirements of the Contract Documents;

9. When there is pending litigation against the City related to this contract or reasonable anticipation thereof;

10. Failure of the contractor to maintain all records as required; to submit progress schedules, weekly payroll records, minority enterprise utilization reports and forms and any other such item required by these specifications;

11. Failure to pay laborers and mechanics employed by the contractor or any subcontractor on the work the full amount of wages required by this contract, after written notice to the contractor.

12. Failure of Contractor of the subcontractors to comply with applicable laws;

13. Any reason specified elsewhere in the Contract Documents as grounds for a withholding, offset or setoff or that would legally entitle City to a setoff or recoupment;

Page 343 of 805 ends

GP-26

14. Additional professional, consultant or inspection services required due to Contractor’s failure to comply with Contract Documents;

15. Liquidated damages payable to City;

16. Materials ordered or paid by City on behalf of Contractor;

17. Damage loss caused to City, a separate contractor, homeowner contractor or any other person or entity due to the actions of the Contractor;

18. Cleanup performed by City and chargeable to Contractor;

19. Failure of Contractor to pay contributions due and owing to employee benefits funds pursuant to applicable collective bargaining agreements or trust agreements;

20. Failure of Contractor or any Subcontractor to properly pay prevailing wages as defined in California Labor Code Section 1720 et/ seq.;

21. A breach by Contractor of any obligation or provision of the Contract Documents.

22. Whenever the City shall, in a ccordance herewith, withhold any monies otherwise due the Contractor, written notice of the amount withheld and the reasons therefore shall be given the Contractor, and, when the Contractor shall remove the grounds for such withholding, the City will pay to the Contractor, within 35 calendar days, the amount so withheld.

Application of Withholding
Sums properly withheld in good faith may be used by City without a prior judicial determination of City’s actual rights with respect to recovery of any Loss on which such withholding is based.

Contractor agrees and hereby designates City as its agent in for such purposes, and agrees that such payments shall be considered as payments made under the Construction Contract by City to Contractor. City shall submit to Contractor accounting of such funds disbursed on behalf of Contractor. As an alternative to such payment, City may, in its sole discretion, elect to exercise its rights to adjust the Contract Sum.

Payment by City

After an Application for Progress Payment has been made, the City shall make payment in a timely manner unless there is a good faith reason for withholding the payments in accordance with the provisions of the Contract Documents or Applicable Law.

Payment to Subcontractors

Upon receipt of payment from City, Contractor shall pay the Subcontractors performing the Work, out of the amount paid to Contractor on account of such Subcontractor’s portion of the work, the amount of which said Subcontractor is entitled in accordance with the terms of its contract with Contractor and Applicable Laws, including, without limitation, California Public Contract Code Section 7107. Contractor shall remain responsible, notwithstanding a withholding by City pursuant to the terms of these General Conditions, to promptly satisfy from its own funds sums due to all Subcontractors who have performed the Work that is included in Contractor’s

Page 344 of 805 ends

GP-27
Application for Payment. Contractor shall, by appropriate agreement, require each Subcontractor to make payments to its sub -contractors and suppliers in similar manner. City shall have no obligation to pay or be responsible in any way for payments to Subcontractors, of any Tier.

Direct Negotiation of Stop Notices

City shall have the right to directly discuss, negotiate, settle or pay, without notice to or participation by Contractor, any stop notice claims asserted by the Subcontractors, of any Tier, and to deduct such sums paid from sums due to Contractor.

Release of Stop Notices

Except to the extent of any payments that City fails to make to Contractor under circumstances that constitute a breach by City of its payment obligations under the Contract Documents, if any stop notice, whether invalid or valid, is made, filed with, served upon or asserted against City or a Homeowner by any of the Subcontractors, of any Tier, or their agent or employee, for money claimed due for Work of any kind provided, then Contractor shall within five (5) Days after written notice by City and at Contractor’s Own Expense, procure, furnish and record appropriate releases or other instruments which under Applicable Laws will full release, extinguish and removed such stop notice. Unless and until such stop notice is fully released as afore -stated, City shall have the right to retain from any payments then due, or thereafter to become due, an amount equal to one hundred and fifty percent (150%) of the amount necessary to satisfy, discharge and defend against any such stop notice and any action or proceeding thereon which may be brought to judgment or award. If the amount to be paid, or the amount retained thereon, is insufficient to satisfy, discharge or defend against such stop notice and any action of proceeding thereon, then Contractor shall be liable for the difference and upon written demand shall immediately deposit the same with City.

The provisions in this paragraph are in addition to such other rights as City may have against Contractor under the Contract Documents or Applicable Laws.

Failure of Payment by City

If, through no fault of Contractor or failure by Contractor to comply with its obligations under the Contract Documents, Payment is not issued within thirty (30) Days after receipt of an undisputed and properly prepared and submitted Application for Payment then Contractor may, upon fourteen (14) additional Days’ written notice to City, stop the Project Work for which such Application for Payment is received until payment is received as to any undisputed and owing work. Any resulting Delay associated with the shut down and start -up of the Project Work as a result of Contractor’s proper exercise of its rights under this paragraph shall constitute a Compensable Delay.

Disputed Payments, Continuous Work

No dispute or disagreement with respect to the amount of any payment claimed due by Contractor shall relieve or excuse Contractor from the obligation to proceed with and maintain continuous, expeditious and uninterrupted performance of the Work.

Completion. Inspection. Punch List. Re-Inspection

A Contractor-generated punch list must be provided to the City or its representative prior to the request for final inspection. It will be the discretion of the City or its representative to grant the final inspection based on the Contractor generated punch list. Contractor shall achieve Completion

Page 345 of 805 ends

GP-28
of the Project Work in accordance with the requirements of the Contract Time and other provisions of the Contract Documents. Contractor shall notify Engineer when Contractor believes that the Project Work for is Complete.

Unless the Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Compliance, the Engineer, accompanied by the Inspector of Record and any others deemed appropriate by the Engineer, will inspect the Project Work performed.

Contractor, along with such Subcontractors and others as Engineer deems necessary shall participate in the inspection. If the Project Work is found to be Complete, then Engineer shall proceed to issue a written completion notice as provided hereinafter.

Any items necessary for Compliance that are found missing, incomplete or requiring correction shall be summarized by Contractor in a Completion Punch List and promptly signed by Contractor and delivered to Engineer. Contractor shall proceed within forty-eight (48) hours after signing the Completion Punch List to commence correction and completion of the items listed.

Contractor shall notify Engineer when the items listed are completed at which time a re-inspection shall be scheduled in the same manner as the original inspection. If said inspection discloses any item, whether or not included on the original Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Completion shall be issued.

The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Compliance of the Project Work. A Notice of Completion shall be issued by the Engineer when he determines that Compliance of the Project Work has occurred.

Final Completion
Contractor shall expeditiously and diligently perform all items of Project Work on the Final Completion Punch List so as to achieve Final Completion of the Project Work within the requirements of the Contract Time for Final Completion of the Project Work. Contractor shall forward to Engineer a written notice when Contractor believes that it has completed all of the items on the Final Completion Punch List and is read for a Final Completion Inspection. Unless Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Final Completion, Engineer, accompanied by Inspector of Record and any others deemed appropriate by Engineer, will inspect Project Work performed. If the Project Work is found to be Finally Complete, then Engineer shall proceed to issue a Notice of Final Completion as provided hereinafter.

If said inspection discloses any item, whether or not included on the Final Completion Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Final Completion shall be issued. The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Final Compliance of the Project Work for any Home. A Notice of Final Completion shall be issued by the Engineer when he determines that Final Compliance of the Project Work has occurred.

Page 346 of 805 ends

GP-29
Concluding Payment

Upon issuance by Engineer of the Notice of Final Completion for the Project Work Contractor shall submit to Engineer its Application for Payment requesting payment for completion. Without limitations to any other conditions to payment set forth elsewhere in the Contract Documents, the following shall be conditions precedent to a proper submission, and to Engineer’s approval, of Contractor’s Application for Final Payment:

1. Submission of an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Project Work for which City or City’s or Homeowner’s property or funds might be liable have been paid or otherwise satisfied;

2. Submission of consent of Surety, if any, to Completion Payment;

3. Submission of a certificate evidencing that the insurance required by the Contract Documents is in force;

4. Submission of conditional releases and waivers of stop notice and bond rights upon final payment in the form required by California Code Section 3262(d)(3) executed by Contractor and by all Subcontractors, of every Tier, performing any portion of the Project Work;

5. Submission of all Close-Out Documents for the Project Work;

6. Submission of adequate and complete certified payroll records as required by the Contract Documents for any time period that Project Work was performed, which have not been submitted by Contractor in connection with its previous Applications for Payments.

7. Proper payment of prevailing wages as defined in California Labor Code Section 1720, et seq for the Project Work.

8. Submission of certificates by Contractor and each Subcontractor, as required by any applicable collective bargaining agreement or trust agreement or Applicable Laws, certifying that all employees’ benefits relating to the Project Work due and owing having been paid in full; and

9. Submission of any other documents or information required by the Contract Documents as a condition of Final Payment or Final Completion of the Project Work.

Final Payment Terminates Liability

No claim shall be made or be filed, and neither the City nor any of its officers or agents shall be liable or held to pay any money, except as specifically provided in the Contract Documents.

The acceptance by the Contractor of the final payment aforesaid shall operate as, and shall be, a release to the City and its agents, from all claim and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act or neglect of the City or of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided elsewhere in these General Conditions.

Page 347 of 805 ends

GP-30
Securities in Lieu of Retention

Provisions of California Public Contract Code Section 22300 et. seq. substitution of eligible and equivalent securities for retention held by City to ensure Contractors performance under the Contract will be permitted at the request and expense of the Contractor and in conformity with California Section 22300. The foregoing notwithstanding, the Contractor shall have ten (10) days following action by the City to award the Agreement to the Contractor to submit its written request to the City to permit the subs titution of securities for retention under California Public Contract Code Section 22300. The failure of such Contractor to make such a written request for the City within said ten (10) day period shall be deemed a waiver of the Contractor’s right under California Public Contract Code Section 22300.

In the event the Contractor wishes to choose to exercise its rights under California Public Contract Code Section 22300, the Contractor shall enter into an escrow agreement with the City, and the escrow agent, a state or federally chartered bank in California with a current A.M. Best Rating of not less than “A,” in the form specified by said Section 22300. Contractor shall have the obligation of ensuring that such securities deposited are sufficient to maintain it total fair market value an amount equal to the cash amount of the sums to be withheld under the Agreement. If upon written notice from the City or from the appropriate escrow agent, indicating that the fair market value of the securities has dropped below the dollar amount of monies to be withheld by the City to ensure performance, Contractor shall, within five (5) days of the date of such notice, post additional securities as necessary to ensure that the total fair market value of all such securities held by the City, or in escrow, is equivalent to the amount of money to be withheld by the City under the Agreement.

Any escrow agreement entered into shall contain the following provisions:
(a) The amount of surety to be deposited;
(b) The terms and conditions of conversion to cash in case of default of the Contractor; and

(c) The termination of the escrow upon completion of the contract.

7.3.3 Delivered Materials.

This subsection of the Standard Specifications is hereby replaced in its entirety by the following:

Materials and equipment delivered but not incorporated into the work will not be included in the estimate for progress partial payment.

7-3.5 Contract Unit Prices.
7-3.5.1 General.

Replace this subsection with the following:

Page 348 of 805 ends

GP-31
If the Engineer orders a change in quantity of an item of Work, and the change does not involve a substantial change in character of the Work from that shown in the Plans or Specifications, the City will adjust the total payment to be made for the item of Work by multiplying the amount authorized and installed by the Contract Unit Price. This amount may be greater or less than the amount shown in the Bid.

If the total quantity of a Major Bid Item is changed, the quantity changes of the quantity shown in the Bid, either more or less, will be adjusted at the Contract Unit Price.

7-3.5.2 Increases of More than 25 Percent

This subsection of the Standard Specifications is hereby replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.

7-3.5.3 Decreases of More than 25 Percent

This subsection of the Standard Specifications is hereby replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.
7-4 PAYMENT FOR EXTRA WORK.
7-4.3 Markup.

Replace this subsection with the following:
7-4.3.1 Work by Contractor.

The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profit:

Labor 20%
Materials 15%
Equipment Rentals 15%
Other Contractor's costs 15%

One percent (1%) may also be added to the sum of costs and markups as compensation for the Contractor's bond premium.

7-4.3.2 Work by Subcontractor.

When a subcontractor performs all or any part of the extra work, the markups in paragraph (a) shall be added to the subcontractor's actual cost of such work. The Contractor may add an additional markup of 10% of the first $5,000 of the subcontracted portion of the extra work and 5% on work added in excess of $5,000 of the subcontracted portion of work.

Page 349 of 805 ends

GP-32
SECTION 8 – FACILITIES FOR AGENCY PERSONNEL

The following is hereby added to this subsection of the Standard Specifications:

No field offices for AGENCY personnel will be required, however, the AGENCY personnel shall have the right to enter upon the project at all times and shall be admitted to the offices of the Contractor for the project in the City if so, provided by the Contractor for his own personnel.

SECTION 9 – CITY STANDARDS, STANDARD PLANS AND DRAWINGS

Section 9 is hereby added to the Standard Specifications as follows:

All public improvements, construction and dedications required and described in this manual shall conform to the standards and specifications of the City. Standards, Standard Plans and Drawings of the following agencies are used by the City of Montebello and are part of the City’s standards.

Where there is ambiguity or conflict between standards over which standard shall apply, the City Engineer shall determine what shall apply, and his determination shall be final. All construction is subject to the approval of the City Engineer.

Standard Plans – Standard Plans for Public Works Construction, SPPWC, “Latest Edition and Supplement”.

Los Angeles County Public Works Department – Grey Book and all plans except those modified or replaced by City Standards.

Los Angeles County Flood Control District - Applicable storm drains.

Sanitation Districts of Los Angeles County - Applicable sewer and manholes.

State of California – California Department of Transportation (Caltrans) Standard Specifications and Standard Plans - Pavement markings and traffic loops.

City Standards - All applicable standard plans.

Standard Specifications - The 2021 edition of, and applicable amendments to, the “Standard Specifications for Public Works Construction (SSPWC).”

California Manual on Traffic Control Devices (CA-MUTCD), “Latest Edition”.

California Building Standards Code – California Code of Regulations, Title 24.

SECTION 10 – CLAIMS AND PROTESTS

Section 10 is hereby added to the Standard Specifications as follows:

Excerpts from the Public Contract Code 9204.

Page 350 of 805 ends

GP-33
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Claim” means a “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.

Page 351 of 805 ends

GP-34
(d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.

Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.

Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.

Page 352 of 805 ends

GP-35
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long asthe contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

PART 4 – EXISTING IMPROVEMENTS

SECTION 400 – PROTECTION AND RESTORATION

400-1 GENERAL.

The second paragraph of Subsection 400 -1 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall relocate, repair, replace or re -establish all existing improvements within the project limits which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, sprinkler systems, signs, utility installations, pavements, structures, etc.) which are damaged or removed as a result of the operations or as required by the Plans and Specifications. The Contractor shall make the effort to repair all sprinklers, pipe, etc by the end of the day.

Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectivity reduced by the Contractor’s operations, such striping or markings shall also be

Page 353 of 805 ends

GP-36
considered as existing improvements and the Contractor shall repaint or replace such improvements.

Relocations, repairs, replacements or re -establishments shall be at least equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified.

All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Irrigation Systems/etc. that might be damaged during construction should be videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per section 400-1 of Standard Specifications for Public Works Construction. All damages to these items shall be fixed to the satisfaction of the City of Montebello without any additional compensation.

400-2 PERMANENT SURVEY MARKERS.

The following is added this this subsection of the Standard Specifications:

The Contractor shall be responsible for the protection and preservation of existing permanent survey monuments and benchmarks during construction. Damaged or lost monuments and benchmarks shall be restored to existing condition by a Registered Civil Engineer or a Land Surveyor licensed by the State of California at no increase in cost to the City.

The Contractor, at its own expense, shall employ a qualified surveyor to perform all survey work required for the completion of the project as specified in the plans and these specifications, comply with the requirements of Section 8771 of the Land Surveyors Act as amended and submit the documents from the County Surveyor as proof of compliance to the City of Montebello. 400-3 PAYMENT

This subsection of the Standard Specifications is hereby deleted and replaced with the following:

No separate or additional payment will be made for 1) protection of existing improvements, 2) restoration of existing improvements and 3) permanent survey markers. All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re -establishing existing improvements shall be included in the bid.

Page 354 of 805 ends

APPENDIX “A”

CONSTRUTION SPECIFICATIONS

Page 355 of 805 ends

DOCUMENT 000102

TABLE OF CONTENTS
City of Montebello 000102 - 1
Fire Stations 56
Renovation

INTRODUCTORY INFORMATION
Document 000102 Table of Contents

SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
Section 01 1000 Summary of Work
Section 01 2976 Progress Payment Procedures
Section 01 3300 Submittal Procedures
Section 01 3543 Environmental Procedures
Section 01 4000 Quality Requirements
Section 01 5000 Temporary Facilities and Controls
Section 01 6000 Product Requirements
Section 01 7300 Execution
Section 01 7419 Construction Waste Management Disposal
Section 01 7704 Closeout Procedures and Training
DIVISION 2 – EXISTING CONDITIONS
Section 024119 Selective Structure Demolition
DIVISION 3 – CONCRETE
Section 03 2000 Concrete Reinforcement
Section 03 3000 Cast-In-Place Concrete
Section 03 3543 Concrete Polish
DIVISION 4 – MASONRY – NOT USED
DIVISION 5 – METALS – NOT USED
DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES
Section 06 1000 Rough Carpentry
Section 06 1600 Sheathing
Section 06 4000 Architectural Woodwork
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
Section 07 1000 Dampproofing
Section 07 2100 Building Insulation
Section 07 9200 Joint Sealants
DIVISION 8 - OPENINGS
Section 08 1113 Hollow Metal Frames
Section 08 1400 Flush Wood Doors
Section 08 3100 Access Doors & Panels
Section 08 7100 Door Hardware
Section 08 8000 Glazing
DIVISION 9 – FINISHES
Section 09 0565 Moisture Testing for Flooring Installation Section 09 2800 Cement Board
Section 09 2900 Gypsum Board
Section 09 3000 Tile
Section 09 5113 Acoustical Panel Ceiling
Section 09 6513 Rubber Base
Section 09 6518 Rubber Flooring
Section 09 9123 Interior Painting

Page 356 of 805 ends

DOCUMENT 000102

TABLE OF CONTENTS
City of Montebello 000102 - 2
Fire Stations 56
Renovation
DIVISION 10 - SPECIALTIES
Section 10 1400 Signage
Section 10 2813 Toilet Accessories
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS – NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED
DIVISION 14 - CONVEYING EQUIPMENT – NOT USED
DIVISION 21 – FIRE SUPPRESSION – NOT USED
DIVISION 22 – PLUMBING
Section 22 0500 Plumbing
Section 22 0522 Common Work Results for Plumbing
Section 22 1116 Domestic Water Piping
Section 22 1319 Sanitary Waste Piping Specialties
Section 22 4000 Plumbing Fixtures and Equipment
Section 22 4223 Commercial Showers and Valves
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING Section 23 0593 - Testing, Adjusting, and Balancing for HVAC Section 23 0713 - Duct Insulation
Section 23 3100 - HVAC Ducts and Casings
Section 23 3200 - Air Duct Cleaning
Section 23 3713 - Diffusers, Registers, and Grilles
DIVISION 25 – INTEGRATED AUTOMATION – NOT USED
DIVISION 26 – ELECTRICAL
Section 26 0500 - Electrical
Section 26 0513 – Electrical Basic Materials and Methods Section 26 0519 - Low Voltage Wires
Section 26 2726 - Wiring Devices
Section 26 5100 – Interior Lighting
DIVISION 27 – COMMUNICATIONS – NOT USED
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY – NOT USED DIVISION 31 – EARTHWORK – NOT USED
DIVISION 32 – EXTERIOR IMPROVEMENTS – NOT USED
DIVISION 33 – UTILITIES – NOT USED

SCHEDULE, CLAUSES AND ATTACHMENTS, AND SOLICITATION REQUIREMENTS Issued separately by the City

END OF DOCUMENT

Page 357 of 805 ends

SECTION 01 1000

SUMMARY OF WORK
City of Montebello 01 1000 - 1
Fire Stations 56
Renovation

GENERAL

1.1 SCOPE

A. The Contractor shall provide all materials, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the construction of the Fire Station 56 , including all incidental work described in the contract documents.

B. The scope of work is contained in the contract documents.

C. The scope of work includes, but is not limited to the following:

1. Renovation of existing Restroom and new Shower Rooms w/ new finishes & plumbing fixtures.

2. Renovation of existing selected Office Rooms.

3. Renovation of existing Kitchenette.

4. Renovation of areas adjacent to the above rooms.

5. Selected door replacement.

6. New exhaust fans.

7. New light fixtures.

8. New Gyp board over existing and new wood framing at walls and ceilings.

9. New R-15 insulation.

10. New polishing finish of existing concrete.

11. New polishing finish of new concrete slab.

12. New beams, posts and footings

13. New ceiling joists.

14. New Acoustic Ceiling Tiles and Grid and Light Fixtures

15. Provide and install all electrical power, conduits, pull boxes, devices, relays, circuit breakers, smoke detectors, occupancy sensors, emergency illuminated signage

16. New speakers, data, ready conduits & J -Box for installation and coordination with County communication data plan.

17. Installation of furniture provided by owner.

18. New accessible Van parking and detectable warning/domes near entrance door.

19. Fully cooperate with all City agencies and other Contractors under contract to the City and assigned to this project.

20. Contractor to obtain building permits from the City’s Building Department. Plans are already check and approved by the Building Department.

21. Install electrical power and water connections for all contractors use. Provide and install one chemical toilet, fencing with green screening around the construction site and dumpster/laydown area (if needed, with prior approval of location from City Engin eer).

22. The contractor is responsible to familiarize themselves with the existing utilities and electronic systems inside and outside the Fire Station to facilitate their work on this project.

23. The contractor is responsible for providing all required insurance, bonds, schedule of values, construction schedules, monthly updated schedules, attending weekly Owner, Architect, Contractor meetings, submitting monthly invoices, certified payrolls, three sets of closeout binders.

24. Contractor shall maintain during construction and provide final as -built drawings at completion of project.

D. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard as determined by the Engineer shall apply.

Page 358 of 805 ends

SECTION 01 1000

SUMMARY OF WORK
City of Montebello 01 1000 - 2
Fire Stations 56
Renovation

1.2 MISCELLANEOUS CONTRACT EXPENSES

A. The Contractor must include in its bid the cost fees or charges payable to State, local, or special community development agencies unless otherwise stated in the General Requirements.

Contractor will be required to obtain building permits from the City’s Building Department as this is a City Public Works Project.

PART 2 - PRODUCTS (Not used)

PART 3 - EXECUTIONI (Not used)

END OF SECTION

Page 359 of 805 ends

SECTION 01 2976

PROGRESS PAYMENT PROCEDURES
City of Montebello 01 2976 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 SUMMARY

A. This Section specifies administrative and procedural requirements for a certified Application for Payment.

1. Coordinate the certified Schedule of Values and certified Application for Payment with, but not limited to, the Construction Schedule, submittal log, and list of Subcontractors.

1.2 RELATED REQUIREMENTS:

A. Section 01 3300 – Submittal Procedures.

B. Section 01 7704 – Closeout Procedures and Training.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION

3.01 APPLICATION FOR PAYMENT
A. Each certified Application for Payment shall be consistent with previous applications and payments as reviewed by Engineer, paid for by City, and:

1. The initial Application for Payment and Final Application for Payment at time of Substantial Completion involve additional requirements.

B. Payment Application Times: The period of Work covered by each Application for Payment is payment date for each progress payment as specified in the General Conditions. The period covered by each Application for Payment is previous month.

C. Payment Application Forms: Use City provided forms for the Application for Payment.

D. Application Preparation: Complete every entry on the form. Include execution by a person authorized to sign legal documents on behalf of General Contractor . Engineer will return incomplete applications without action.

E. Transmittal: Submit a minimum of one signed and original copies of each certified Application for Payment to Engineer. All copies shall be complete, including releases and similar attachments.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information related to the application, in a manner acceptable to Engineer.

F. Initial Application for Payment within 60 days of issuance of Notice to Proceed: Administrative actions and submittals, that must precede or coincide with submittal for first certified Application for Payment include, but are not limited to, the following:

1. Certified Schedule of Values.

2. Performance and payment bonds.

3. List of principal suppliers and fabricators.

4. Worker Compensation certificates, if applicable.

5. Auto Insurance, if applicable.

Page 360 of 805 ends

SECTION 01 2976

PROGRESS PAYMENT PROCEDURES
City of Montebello 01 2976 - 2
Fire Stations 56
Renovation

6. Hazardous Material Insurance Certificates, if applicable.

7. Construction Schedule.

8. Submittal Schedule.

9. Emergency Contact List.

10. Copies of authorizations and licenses from governing authorities for performance of Work.

11. Certified Payroll (Submitted directly to Labor Compliance in electronic format as specified by City including hard copy).

G. Applications for Payment: Administrative actions and submittals that must precede or coincide with submittal of Progress Applications for Payment include, but are not limited to, the following:

1. Certified Payroll (submitted directly to Labor Compliance in electronic format as specified by City including hard copy).

2. Updated and current Project Record Drawings (as-built).

3. Monthly Construction Schedule (updated, submitted and approved).

4. Approved Schedule of Values.

5. List of Subcontractors (Payments Summary).

H. Final Application for Payment at Substantial Completion: Following Engineer issuance of certificate of Substantial Completion, submit an Application for Payment:

1. Administrative actions, submittals and/or Work that shall precede or coincide with this application include:
a. Occupancy permits and similar approvals by authorities having legal jurisdiction over Work.
b. Removal of temporary facilities and services.
c. Testing, adjusting and balance records.
d. Removal of surplus materials, rubbish, and similar elements. e. Meter readings.
f. Start-up performance reports.
g. City personnel training and orientations.
h. Operating and maintenance instruction manuals.
i. Preliminary Warranties, guarantees and maintenance agreements. j. Delivery of extra materials, products and or stock.
k. Change over information related to City occupancy, use, operation, and maintenance. l. Final cleaning.
m. Ensure that Work is completed.
n. Advise on shifting insurance coverage.
o. List of defective Work, recognized as exceptions to certificate of Substantial Completion.
p. Change of door locks, including keys, to City system. q. Certified Payroll (submitted directly to Labor Compliance in electronic format as specified by the City including hard copy).
r. Certification that all benefit contributions due and owing to appropriate union trusts has been paid by General Contractor and Subcontractors, as specified by the Project Stabilization Agreement (PSA) and Article 6.49 of the General Conditions. s. Waivers and releases for General Contractor.

Payment amount to be based on actual quantities of work completed and unit bid prices. Total bid item quantities completed x unit bid price.

END OF SECTION

Page 361 of 805 ends

SECTION 01 3300

SUBMITTAL PROCEDURES
City of Montebello 01 3300 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 Schedule of Submittals

A. Within 30 days after receiving a Notice to Proceed, the Contractor must submit a Schedule of Submittals, in the format indicated below, in duplicate, listing all items that must be furnished for review and approval by the Engineer. The schedule must indicate the type of items (such as sample, shop drawings, catalog cut, and so forth) and include the scheduled dates of submittal.

In preparing the schedule, adequate time (10 days or more exclusive of time in the mail) must be allowed for review and approval and possible resubmittal. Also, the schedule must be coordinated with the approved constru ction progress chart. The Contractor must revise and/or update the schedule monthly. Such revised schedules must be submitted to the Engineer for approval.

B. During bidding and w ithin 30 days after receiving a Notice to Proceed, the Contractor m ust complete and submit to the Engineer a listing of all subcontractors, including subcontractor name, address, telephone number, fax number and email address. Include an updated list with each progress payment request.

C. Schedule of Submittals Format

Project

Contract No.

Project Description

Spec.

Section
Spec.

Description
Paragraph
Number
*Submittal
Type
Date Action
Taken
Assigned
Number
Submittal Returned

*Submittal Type:

C – Certificate CD – Catalog Data
S – Sample PL – Spare Parts List
SD – Shop Drawing MM – Maintenance Manual

1.2 Shop Drawings and Related Data

A. Prior to submittal, the Contractor must stamp and sign the submittal to indicate that it is in accordance with the contract documents without deviation and has been reviewed and approved by the Contractor. The Contractor must make any corrections required by the Engineer. If the Contractor considers any corr ection indicated on the drawings to constitute a change to the contract drawings or specifications, notice must be given to the Engineer. Four prints of all approved shop drawings must be given to the Engineer. The approval of the drawings by the Engineer must not be construed as a complete check but indicates only that the submittal appears to comply with the contract documents. Approval of the shop drawings does not relieve the Contractor of responsibility for any error that may exist because the Contractor is responsible for

Page 362 of 805 ends

SECTION 01 3300

SUBMITTAL PROCEDURES
City of Montebello 01 3300 - 2
Fire Stations 56
Renovation
the dimensions and for satisfactory construction of all work. The submission by the Contractor must be accompanied by a transmittal letter in a format approved by the Engineer.

1.3 Material, Equipment, and Fixture Lists

A. When required by the technical provisions, lists of materials, equipment, and fixtures must be submitted by the Contractor in accordance with the requirements specified for shop drawings.

The lists must be supported by sufficient descriptive material, suc h as catalogs, cuts, diagrams, and other data published by the manufacturer, as well as by evidence of compliance with safety and performance standards, to demonstrate conformance to the specification requirements.

Catalog numbers alone are not acceptable. The data must include the name and address of the nearest service and maintenance organization that regularly stocks repair parts. No consideration will be given to partial lists submitted from time to time. Approval of materials and equipment is tentative, subject to submission of complete shop drawings indicating compliance with the contract documents.

1.4 Certificates of Compliance

A. Any certificates required for demonstrating proof of compliance of materials with specification requirements, including statements of application, and extended guarantees, must be signed and submitted in quadruplicate to the Engineer at least 10 days before delivery. The Contractor must review all certificates before submissions are made to the Engineer, to ensure complian ce with the contract specification requirements and to ensure that the affidavit is properly signed. Each certificate must be signed by an official authorized to certify on behalf of the manufacturing company and must contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply.

Copies of laboratory test reports submitted with certificates must contain the name and address of the testing laboratory and the dates of tests to which the report applies. Certification must not be construed as relieving the Contractor from furnishing sa tisfactory material if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

1.5 Review of Submittals

A. When submittals are reviewed by others, each submittal must be returned to the Engineer stamped and signed or marked in one of the following ways:

1. A Action: The Contractor is advised that "A Action" means that fabrication, manufacture, or construction may proceed, provided the work complies with the contract documents.

2. B Action: The Contractor is advised that "B Action" means that fabrication, manufacture, or construction may proceed, provided the work complies with the notations and the contract documents.

3. C Action: The Contractor is advised that "C Action" means that no work may be fabricated, manufactured, or constructed and that the Contractor must make a new submittal. Any submission marked "C Action" is not permitted on the site.

B. The "A Action" or "B Action" submittals must be returned to the Engineer. The Contractor is responsible for obtaining prints of them and for distributing them to the field and to subcontractors.

C. In the case of shop drawings in the form of manufacturers' descriptive literature, catalog cuts, and brochures stamped "A Action" or "B Action," returned to the Engineer, the Contractor is responsible for distributing them to the field and to the subcontra ctors. If the shop drawings are stamped "C Action," the Engineer will provide copies to the Contractor, who must submit new shop drawings to the Engineer.

Page 363 of 805 ends

SECTION 01 3300

SUBMITTAL PROCEDURES
City of Montebello 01 3300 - 3
Fire Stations 56
Renovation
D. In the case of samples stamped "A Action" or "B Action," the Engineer will provide one of the samples to the Contractor. In the case of samples stamped "C Action," all of the submitted samples must be returned.

1.6 Spare Parts Data

A. Spare parts data must be submitted in quadruplicate.

1.7 Schedule of Values

A. The Contractor must submit a construction cost breakdown using the City provided Schedule of Values. When applicable, a separate cost breakdown form must be submitted for each separate building. However, the total cost of site work for each facility must be included in the cost estimate breakdown for each restroom building and exterior work. The number of items provided on the Systems Construction Cost Estimate Breakdown form are the minimum required. Additional subdivision of these items may be used by the Contractor.

B. Submit the construction cost breakdown after contract award to the Engineer.

C. Do not delete items from the Schedule of Values form. However, expand the schedule “Description of Work” as necessary to allow evaluation of work or to make progress payments.

D. If the contract price changes, the Schedule of Values must be revised to reflect the change(s) and forwarded to the Engineer.

E. A current Schedule of Values must accompany all Contractor Requests for Payment.

F. See following exhibit for Schedule of Values.

1.8 As-built plans.

A. Contractor to submit as built plans.

B. During construction, maintain as -built redline drawings for all drawings and final as -builds for contractor-generated coordination drawings. Update after completion of commissioning.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)

END OF SECTION

Page 364 of 805 ends

SECTION 01 3543

ENVIRONMENTAL PROCEDURES
City of Montebello 01 3543 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 Scope
A. The work covered by this section consists of furnishing all labor, material, and equipment and performing all work required for compliance with environmental regulations and preventing pollution during, and as a result of, construction operations under this contract, in addition to those measures set forth in other technical provisions of these specifications.

B. The Contractor and subcontractors must comply with all applicable environmental federal, state, local environmental, health and safety laws and regulations.

1.2 Notification
A. The Contractor must, after receiving a notice of noncompliance with the foregoing provisions, immediately take corrective action. The notice, when delivered to its Contractor or its authorized representative at the site of the work, is deemed sufficient for this purpose. If the Contractor fails or refuses to comply promptly, the Engineer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost because of any such stop orders may be made the subject of a claim for extension of time or for excess costs or damages by the Contractor unless it is subsequently determined that the Contractor complied.

1.3 Environmental Regulatory Compliance
A. Within 30 days after receiving the notice to proceed or not less than 15 days prior to commencing on-site work, the Contractor must submit any environmental documents that are required by federal, state or local environmental regulations. Plans must be approved by the Engineer prior to commencing on-site work and must describe and include, but is not limited to, the following

1. Waste Minimization and Management Plan must describe how natural resources potentially impacted by construction will be protected or managed; construction wastes will be stored and disposed of or recycled; and pollutants associated with building materials will be controlled. The waste minimization and management section of the plan must also list materials and construction debris to be recycled, and address the disposal of solid and hazardous wastes and materials, including asbestos and lead-based paint. It must also include tables applicable to the reclamation of chlorofluorocarbons (CFCs) and hydrochlorofluorocarbons (HCFCs) in accordance with the City recycling code and 1.4 (B) below.

2. Environmental Compliance Plan must document NEPA compliance by describing mitigation measures to address environmental concerns/sensitive receptors identified in the National Environmental Policy Act (NEPA) document(s) in Section B. 1500, Attachments, and as set out in the mitigation measures in the General Requirements.

1.4 Environmental Site Controls
A. Location of Hazardous Materials: The location of the Contractor’s temporary storage of any hazardous materials and/or wastes must be appropriately marked and included in the health and Safety Plan (see Section 1.5 below).

Page 365 of 805 ends

SECTION 01 3543

ENVIRONMENTAL PROCEDURES
City of Montebello 01 3543 - 2
Fire Stations 56
Renovation
B. Post Construction Cleanup or Obliteration: The Contractor must remove and properly dispose of all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, excess or waste materials, or any other vestiges of construction as directed by the Engineer. No separate or direct payment may be made for post construction cleanup and all associated costs must be considered included in the contract price.

C. Dust Control: The Contractor must keep the site free from dust in accordance with applicable regulations.

D. Noise Minimization: The Contractor must perform demolition and construction operations to minimize noise including conducting work during less sensitive hours of the day in accordance with the City’s Noise Ordinance.

1.5 Health and Safety
A. Prior to commencing on-site work, the Contractor must submit an Occupational Safety and Health Administration (OSHA) Emergency Action Plan (EAP) to the Engineer to demonstrate compliance by the Contractor and subcontractors with applicable OSHA regulations. If the Contractor is not required by OSHA to develop a written EAP, i.e., if 10 or fewer are employed for the construction project or any other specific regulations identified by OSHA, then the Contractor shall submit to the Engineer a signed letter stating the Contractor shall meet OSHA's EAP requirements in a verbal communication to all employees.

B. Copies of Material Safety Data Sheets (MSDSs) for any hazardous material(s), as defined by OSHA's Hazard Communications Standard, must be included whenever such materials arrive on- site. MSDSs must be kept together and maintained centrally on-site through to project completion.

Provide a copy of each MSDS in the Operating and Maintenance Manual. The use of asbestos containing materials, in excess of one percent as defined by US Environmental Protection Agency regulations, is prohibited in the construction of this project. Provide an executed copy of the “Certificate of Asbestos and Lead-Based Paint (New Work)” in the Operating and Maintenance Manual.

C. The use of lead-based paint is prohibited in the construction of this project.

D. The use of lead-containing solder for plumbing and plumbing fixtures is prohibited in the construction of this project.

E. The Contractor must sign and submit to the Engineer a “Certification of Asbestos and Lead-Based Paint” for this project.

F. See following exhibits for additional information.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)

END OF SECTION

Page 366 of 805 ends

SECTION 01 3543

ENVIRONMENTAL PROCEDURES
City of Montebello 01 3543 - 3
Fire Stations 56
Renovation
Safety and Health and Related Environmental Requirements The Contractor is required to meet all applicable OSHA, federal, state, and local safety, health, and related environmental requirements in addition to the City requirement listed in this table.

Issue City Requirements
Asbestos Review of Facility Asbestos Survey: Before any building maintenance, equipment installation, renovation, alteration, demolition, or other project begins, determine whether ACBM will be disturbed.

Proper Work Practices: If ACBM is present, follow proper control procedures and work practices.

Consultation With Facility Asbestos Coordinator: Consult with the facility manager or his or her designee before the start of any work likely to disturb ACBM.

Disturbance means activities that crumble or pulverize ACBM or presumed asbestos-containing material (PACM) or generate visible debris. Operations may include drilling, abrading, cutting a hole, pulling cable, and crawling through tunnels or attics and spaces above the ceiling where asbestos is actively disturbed or asbestos-containing debris is actively disturbed.

Asbestos Work Authorization: You must have an approved Form 8210, Work Authorization - Asbestos, before work begins within any building containing asbestos.

Barricades, Barriers,
and Warnings
Your barricades must meet the OSHA requirements. In addition, you assume control of your work area during your activities unless otherwise specified in writing by the City Engineer (CE) or City Engineer's representative (CER).

Confined Spaces Confined space work must meet the OSHA requirements. You must have a comprehensive confined space program that includes a written program, employee training, entry and testing equipment, and rescue capabilities.

If you require access to confined space requiring a permit, then the trained, designated City representative must review and approve the project and permit.

Entry into other confined spaces must be in accordance with OSHA regulations.

Electrical Work Lock or rope off work areas involving exposed energized equipment or have an attendant present to prevent accidental contact by unqualified people. Refer to the Barricade section of this guideline for additional information.

Elevated Work and Fall
Protection
Follow strictly the applicable OSHA fall protection requirements.

Excavation All excavations 4 feet or more in depth must be properly shored or sloped and meet all OSHA requirements.

Before any digging or drilling commences, inform the City COR and call Dig Safe or its local equivalent to determine whether any underground utilities are located in the work area. Submit documentation that these notifications have been performed.

You must not begin digging or drilling until you have verified that underground utilities have been identified and are properly marked so that work may be accomplished in a safe manner.

Fire Protection Do not block, remove, or otherwise prevent City fire extinguishers from being immediately accessible and usable.

If a system must be impaired by a scheduled shutdown, notify the Engineer and do not proceed without the Engineer’s authorization.

Hazard Communication Inform the Engineer before any chemicals are used. Before materials are brought on site, provide material safety data sheets (MSDSs) and an inventory of materials.

For projects that are anticipated to use substantial quantities of hazardous materials, you may be required to provide a routing, storage, and waste disposal plan.

Hazardous Materials Follow all OSHA requirements regarding hazardous materials. Hazardous materials include, but are not limited to, flammable and combustible liquids, gasoline, diesel

Page 367 of 805 ends

SECTION 01 3543

ENVIRONMENTAL PROCEDURES
City of Montebello 01 3543 - 4
Fire Stations 56
Renovation
fuel, motor oil, lubricating oil, hydraulic oil, corrosive cleaners, and battery acid.

Provide secondary containment for all containers of liquids that are over 5 gallons in capacity.

Immediately report all hazardous material releases ("spills"), regardless of how small or where they occur, to the designated Engineer. Releases include solids, liquids, and gases.

Hot Work Do not begin any hot work until the Engineer has completed and signed a City Hot Work Permit. The permit will be valid for only a single work shift. You must display the permit at the work site.

You are prohibited from performing hot work (a) when the City has not authorized it, (b) in locations in which fire protection systems have been impaired, (c) in the presence of explosive or flammable atmospheres, or (d) in locations were large quantities of flammable and combustible materials are unprotected.

Powered Industrial
Trucks
Powered industrial trucks and other mobile equipment must follow all traffic rules of the City facility. The maximum speed limit for in-plant powered vehicles is 5 miles per hour. Many work areas have posted speed limits that you must strictly follow.

Perform refueling only in authorized locations following safe procedures.

As a general rule, the City does not allow gas- or diesel-powered industrial equipment inside City facilities. Coordinate exceptions to the rule through the City safety office.

Ladders Strictly follow all OSHA requirements regarding ladders. Barricade the ladder use area to prevent contact with mobile equipment and employees.

Lead-Based Paint Review of Facility Lead Survey: Before any construction, alterations, and/or repair activities begin, determine whether LBP will be disturbed. If the painted surface has not been tested, you must have it tested before beginning any activities that could potentially disturb LBP.

Proper Work Practices: If LBP is present, follow proper control procedures and work practices.

Consultation With Engineer: Consult with the Engineer before the start of any work likely to disturb LBP. Examples of activities that may affect LBP include paint removal by scraping, sanding, power tools, or heat guns; alterations that include removing drywall, structural steel, or other building materials coated with LBP; welding, cutting, or other hot work on coated metal surfaces; abrasive blasting of mail boxes and other equipment; and moving or cleaning of abrasive blasting enclosures.

Lockout/Tagout Provide a copy of your lockout/tagout procedures, which must meet or exceed the OSHA Lockout/Tagout standard. You will be given access to and must review the City lockout/tagout program.

If you encounter a City lockout/tagout device that prevents the continuation of work, do not make any attempts to remove, tamper with, or bypass the devices. Contact the Engineer and make arrangements to have the lockout device removed in accordance with City lockout removal policies.

Personal Protective
Equipment
Before beginning work, evaluate the work area for hazards, determine whether contract employees will be required to use personal protective equipment (PPE) to protect themselves from these hazards, and document the hazard assessment.

Wear the PPE required regardless of your perception of hazard potential.

Regulated And
Prohibited Materials
Pesticides. The City has restricted the use of pesticides. Obtain prior approval of the City environmental compliance coordinator for special cases that may require the use of pesticide treatments.

Seventeen Chemical Prohibition. Adhere to chemical prohibition policies. Do not use on City property any of the 17 chemicals prohibited by EPA unless the Engineer authorizes its use (each of these chemicals must be authorized separately). The district environmental compliance coordinator can supply the list.

Page 368 of 805 ends

SECTION 01 3543

ENVIRONMENTAL PROCEDURES
City of Montebello 01 3543 - 5
Fire Stations 56
Renovation
Asbestos-Free Products. Install no asbestos-containing products or materials in City facilities.

Lead. Apply no lead-based paint in City facilities.

Scaffolding Follow strictly the applicable OSHA scaffolding requirements.

Provide adequate barrier protection around the scaffolding to prevent hazards to City staff.

Walking and Working
Surfaces
If the project requires temporary modifications to the means of egress, inform the Engineer before performing such actions, provide appropriate alternative means of egress, and communicated these to all employees.

Page 369 of 805 ends

SECTION 01 3543

ENVIRONMENTAL PROCEDURES
City of Montebello 01 3543 - 6
Fire Stations 56
Renovation
Emergency Procedures
Preparations for
Emergency
Be prepared for emergency situations.

Ensure that emergency telephone numbers are site specific, readily available, easily read, and communicated to all employees.

Train and authorize employees to implement emergency procedures.

Medical Emergencies Have procedures and medical supplies to provide emergency medical services for your own personnel.

Determine how to contact emergency medical services before work begins, and have on-site capabilities to contact such services immediately.

Fires See Fire Protection above.

In the event of a fire, you must:
- Immediately remove personnel from the area or building following City evacuation procedures.
- Immediately contact the nearest City employee and inform him or her of the fire.

You may also activate an emergency alarm in the area. If no City employees are on- site, immediately contact the local fire department.

Personnel trained in the use and limitations of fire extinguishers may attempt to extinguish the fire if it is safe to do so.

Chemical Releases See Hazardous Materials above.

If the event of a hazardous material release, you must:
- Immediately remove personnel from the area or building following City evacuation procedures.
- Immediately contact the designated City representative and inform him or her of the release. You may also activate an emergency alarm in the area. If no City employees are on-site, immediately contact the local fire department.

Contractor personnel should not respond to the release unless specifically trained and protected to perform hazardous material response.

Power Outages In the event of a power outage, you must:
- Immediately stop work and assemble for a head count and possible facility egress. - Inform all contract employees that equipment may automatically restart when power resumes.
- Immediately contact the designated City representative and inform him or her of the status of contract work and personnel head count. Relay at this time all hazards created due to the power outage.

When power resumes evaluate the status of operations that were being performed relative to hazard potential. For example, the interruption of ventilation in confined spaces may generate atmospheric hazards.

Accident Investigation
and Reporting
As soon as is practical after an accident, investigate and document an accident investigation. The documentation must describe the incident and identify the causes and the corrective actions that will prevent future incidents.

Report all accidents, whether or not they result in injury. Give the written report to the Engineer within 24 hours of the accident or incident.

CERTIFICATE OF ASBESTOS AND LEAD-BASED PAINT

Page 370 of 805 ends

SECTION 01 3543

ENVIRONMENTAL PROCEDURES
City of Montebello 01 3543 - 7
Fire Stations 56
Renovation
(New Work)
To: City Engineer
Subject: Certification for new construction
City facility name:

City facility address:

Certification for new construction:

This Contractor/Owner hereby certifies that no asbestos-containing material in excess of 1 percent as defined by applicable US Environmental Protection Agency regulations, and no lead-based paint has been furnished or installed at the referenced project.

Contractor/Owner name:

Signature:

Address:

Telephone: Date executed:

Page 371 of 805 ends

SECTION 01 1000

SUMMARY OF WORK
City of Montebello 01 1000 - 1
Fire Stations 56
Renovation

GENERAL

1.1 SCOPE
A. The Contractor shall provide all materials, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the construction of the Fire Station 56, including all incidental work described in the contract documents.

B. The scope of work is contained in the contract documents.

C. The scope of work includes, but is not limited to the following:

1. Renovation of existing Restroom and Shower Rooms w/ new finishes & plumbing fixtures.

2. Renovation of existing selected Office Rooms.

3. Renovation of existing Kitchenette.

4. Renovation of areas adjacent to the above rooms.

5. Selected door replacement.

6. New exhaust fans.

7. New light fixtures.

8. New Gyp board over existing and new wood framing at walls and ceilings.

9. New R-15 insulation.

10. New polishing finish of existing concrete.

11. New polishing finish of new concrete slab.

12. New beam

13. New ceiling joist.

14. Provide and install all electrical power, conduits, pull boxes, devices, relays, circuit breakers.

15. New speakers, data, ready conduits & J-Box for installation and coordination with County communication data plan.

16. New accessible Van parking and detectable warning/domes near entrance door.

17. Fully cooperate with all City agencies and other Contractors under contract to the City and assigned to this project.

18. Contractor to obtain building permits from the City’s Building Department. Plans are already check and approved by the Building Department.

19. Install electrical power and water connections for all contractors use. Provide and install one chemical toilet, fencing with green screening around the construction site and dumpster/laydown area (if needed, with prior approval of location from City Engineer).

20. The contractor is responsible to familiarize themselves with the existing utilities and electronic systems inside and outside the Fire Station to facilitate their work on this project.

21. The contractor is responsible for providing all required insurance, bonds, schedule of values, construction schedules, monthly updated schedules, attending weekly Owner, Architect, Contractor meetings, submitting monthly invoices, certified payrolls, three sets of closeout binders.

22. Contractor shall maintain during construction and provide final as-built drawings at completion of project.

D. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard as determined by the Engineer shall apply.

1.2 MISCELLANEOUS CONTRACT EXPENSES

Page 372 of 805 ends

SECTION 01 1000

SUMMARY OF WORK
City of Montebello 01 1000 - 2
Fire Stations 56
Renovation
A. The Contractor must include in its bid the cost fees or charges payable to State, local, or special community development agencies unless otherwise stated in the General Requirements.

Contractor will be required to obtain building permits from the City’s Building Department as this is a City Public Works Project.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTIONI (Not used)

END OF SECTION

Page 373 of 805 ends

SECTION 01 2976

PROGRESS PAYMENT PROCEDURES
City of Montebello 01 2976 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 SUMMARY
A. This Section specifies administrative and procedural requirements for a certified Application for Payment.

1. Coordinate the certified Schedule of Values and certified Application for Payment with, but not limited to, the Construction Schedule, submittal log, and list of Subcontractors.

1.2 RELATED REQUIREMENTS:

A. Section 01 3300 – Submittal Procedures.

B. Section 01 7704 – Closeout Procedures and Training.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION

3.01 APPLICATION FOR PAYMENT
A. Each certified Application for Payment shall be consistent with previous applications and payments as reviewed by Engineer, paid for by City, and:

1. The initial Application for Payment and Final Application for Payment at time of Substantial Completion involve additional requirements.

B. Payment Application Times: The period of Work covered by each Application for Payment is payment date for each progress payment as specified in the General Conditions. The period covered by each Application for Payment is previous month.

C. Payment Application Forms: Use City provided forms for the Application for Payment.

D. Application Preparation: Complete every entry on the form. Include execution by a person authorized to sign legal documents on behalf of General Contractor. Engineer will return incomplete applications without action.

E. Transmittal: Submit a minimum of one signed and original copies of each certified Application for Payment to Engineer. All copies shall be complete, including releases and similar attachments.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information related to the application, in a manner acceptable to Engineer.

F. Initial Application for Payment within 60 days of issuance of Notice to Proceed: Administrative actions and submittals, that must precede or coincide with submittal for first certified Application for Payment include, but are not limited to, the following:

1. Certified Schedule of Values.

2. Performance and payment bonds.

3. List of principal suppliers and fabricators.

4. Worker Compensation certificates, if applicable.

5. Auto Insurance, if applicable.

Page 374 of 805 ends

SECTION 01 2976

PROGRESS PAYMENT PROCEDURES
City of Montebello 01 2976 - 2
Fire Stations 56
Renovation

6. Hazardous Material Insurance Certificates, if applicable.

7. Construction Schedule.

8. Submittal Schedule.

9. Emergency Contact List.

10. Copies of authorizations and licenses from governing authorities for performance of Work.

11. Certified Payroll (Submitted directly to Labor Compliance in electronic format as specified by City including hard copy).

G. Applications for Payment: Administrative actions and submittals that must precede or coincide with submittal of Progress Applications for Payment include, but are not limited to, the following:

1. Certified Payroll (submitted directly to Labor Compliance in electronic format as specified by City including hard copy).

2. Updated and current Project Record Drawings (as-built).

3. Monthly Construction Schedule (updated, submitted and approved).

4. Approved Schedule of Values.

5. List of Subcontractors (Payments Summary).

H. Final Application for Payment at Substantial Completion: Following Engineer issuance of certificate of Substantial Completion, submit an Application for Payment:

1. Administrative actions, submittals and/or Work that shall precede or coincide with this application include:
a. Occupancy permits and similar approvals by authorities having legal jurisdiction over Work.
b. Removal of temporary facilities and services.
c. Testing, adjusting and balance records.
d. Removal of surplus materials, rubbish, and similar elements. e. Meter readings.
f. Start-up performance reports.
g. City personnel training and orientations.
h. Operating and maintenance instruction manuals.
i. Preliminary Warranties, guarantees and maintenance agreements. j. Delivery of extra materials, products and or stock.
k. Change over information related to City occupancy, use, operation, and maintenance. l. Final cleaning.
m. Ensure that Work is completed.
n. Advise on shifting insurance coverage.
o. List of defective Work, recognized as exceptions to certificate of Substantial Completion.
p. Change of door locks, including keys, to City system. q. Certified Payroll (submitted directly to Labor Compliance in electronic format as specified by the City including hard copy).
r. Certification that all benefit contributions due and owing to appropriate union trusts has been paid by General Contractor and Subcontractors, as specified by the Project Stabilization Agreement (PSA) and Article 6.49 of the General Conditions. s. Waivers and releases for General Contractor.

Payment amount to be based on actual quantities of work completed and unit bid prices. Total bid item quantities completed x unit bid price.

END OF SECTION

Page 375 of 805 ends

SECTION 01 3300

SUBMITTAL PROCEDURES
City of Montebello 01 3300 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 Schedule of Submittals
A. Within 30 days after receiving a Notice to Proceed, the Contractor must submit a Schedule of Submittals, in the format indicated below, in duplicate, listing all items that must be furnished for review and approval by the Engineer. The schedule must indicate the type of items (such as sample, shop drawings, catalog cut, and so forth) and include the scheduled dates of submittal.

In preparing the schedule, adequate time (10 days or more exclusive of time in the mail) must be allowed for review and approval and possible resubmittal. Also, the schedule must be coordinated with the approved construction progress chart. The Contractor must revise and/or update the schedule monthly. Such revised schedules must be submitted to the Engineer for approval.

B. During bidding and within 30 days after receiving a Notice to Proceed, the Contractor must complete and submit to the Engineer a listing of all subcontractors, including subcontractor name, address, telephone number, fax number and email address. Include an updated list with each progress payment request.

C. Schedule of Submittals Format
Project
Contract No.

Project Description
Spec.

Section
Spec.

Description
Paragraph
Number
*Submittal
Type
Date Action
Taken
Assigned
Number
Submittal Returned
*Submittal Type:

C – Certificate CD – Catalog Data
S – Sample PL – Spare Parts List
SD – Shop Drawing MM – Maintenance Manual

1.2 Shop Drawings and Related Data
A. Prior to submittal, the Contractor must stamp and sign the submittal to indicate that it is in accordance with the contract documents without deviation and has been reviewed and approved by the Contractor. The Contractor must make any corrections required by the Engineer. If the Contractor considers any correction indicated on the drawings to constitute a change to the contract drawings or specifications, notice must be given to the Engineer. Four prints of all approved shop drawings must be given to the Engineer. The approval of the drawings by the Engineer must not be construed as a complete check but indicates only that the submittal appears to comply with the contract documents. Approval of the shop drawings does not relieve the Contractor of responsibility for any error that may exist because the Contractor is responsible for

Page 376 of 805 ends

SECTION 01 3300

SUBMITTAL PROCEDURES
City of Montebello 01 3300 - 2
Fire Stations 56
Renovation
the dimensions and for satisfactory construction of all work. The submission by the Contractor must be accompanied by a transmittal letter in a format approved by the Engineer.

1.3 Material, Equipment, and Fixture Lists
A. When required by the technical provisions, lists of materials, equipment, and fixtures must be submitted by the Contractor in accordance with the requirements specified for shop drawings.

The lists must be supported by sufficient descriptive material, such as catalogs, cuts, diagrams, and other data published by the manufacturer, as well as by evidence of compliance with safety and performance standards, to demonstrate conformance to the specification requirements.

Catalog numbers alone are not acceptable. The data must include the name and address of the nearest service and maintenance organization that regularly stocks repair parts. No consideration will be given to partial lists submitted from time to time. Approval of materials and equipment is tentative, subject to submission of complete shop drawings indicating compliance with the contract documents.

1.4 Certificates of Compliance
A. Any certificates required for demonstrating proof of compliance of materials with specification requirements, including statements of application, and extended guarantees, must be signed and submitted in quadruplicate to the Engineer at least 10 days before delivery. The Contractor must review all certificates before submissions are made to the Engineer, to ensure compliance with the contract specification requirements and to ensure that the affidavit is properly signed. Each certificate must be signed by an official authorized to certify on behalf of the manufacturing company and must contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply.

Copies of laboratory test reports submitted with certificates must contain the name and address of the testing laboratory and the dates of tests to which the report applies. Certification must not be construed as relieving the Contractor from furnishing satisfactory material if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

1.5 Review of Submittals
A. When submittals are reviewed by others, each submittal must be returned to the Engineer stamped and signed or marked in one of the following ways:

1. A Action: The Contractor is advised that "A Action" means that fabrication, manufacture, or construction may proceed, provided the work complies with the contract documents.

2. B Action: The Contractor is advised that "B Action" means that fabrication, manufacture, or construction may proceed, provided the work complies with the notations and the contract documents.

3. C Action: The Contractor is advised that "C Action" means that no work may be fabricated, manufactured, or constructed and that the Contractor must make a new submittal. Any submission marked "C Action" is not permitted on the site.

B. The "A Action" or "B Action" submittals must be returned to the Engineer. The Contractor is responsible for obtaining prints of them and for distributing them to the field and to subcontractors.

C. In the case of shop drawings in the form of manufacturers' descriptive literature, catalog cuts, and brochures stamped "A Action" or "B Action," returned to the Engineer, the Contractor is responsible for distributing them to the field and to the subcontractors. If the shop drawings are stamped "C Action," the Engineer will provide copies to the Contractor, who must submit new shop drawings to the Engineer.

Page 377 of 805 ends

SECTION 01 3300

SUBMITTAL PROCEDURES
City of Montebello 01 3300 - 3
Fire Stations 56
Renovation
D. In the case of samples stamped "A Action" or "B Action," the Engineer will provide one of the samples to the Contractor. In the case of samples stamped "C Action," all of the submitted samples must be returned.

1.6 Spare Parts Data
A. Spare parts data must be submitted in quadruplicate.

1.7 Schedule of Values
A. The Contractor must submit a construction cost breakdown using the City provided Schedule of Values. When applicable, a separate cost breakdown form must be submitted for each separate building. However, the total cost of site work for each facility must be included in the cost estimate breakdown for each restroom building and exterior work. The number of items provided on the Systems Construction Cost Estimate Breakdown form are the minimum required. Additional subdivision of these items may be used by the Contractor.

B. Submit the construction cost breakdown after contract award to the Engineer.

C. Do not delete items from the Schedule of Values form. However, expand the schedule “Description of Work” as necessary to allow evaluation of work or to make progress payments.

D. If the contract price changes, the Schedule of Values must be revised to reflect the change(s) and forwarded to the Engineer.

E. A current Schedule of Values must accompany all Contractor Requests for Payment.

F. See following exhibit for Schedule of Values.

1.8 As-built plans.

A. Contractor to submit as built plans.

B. During construction, maintain as-built redline drawings for all drawings and final as-builds for contractor-generated coordination drawings. Update after completion of commissioning.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)

END OF SECTION

Page 378 of 805 ends

SECTION 01 4000

QUALITY REQUIREMENTS
City of Montebello 01 4000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 Contractor Quality Control
A. Contractor Quality Control: The Contractor is responsible for the overall quality of all its own work and the work performed by their subcontractors working under this contract. The quality of any part of the work installed must not be less than that required by the technical divisions of this specification. If the Engineer determines that the quality of work does not conform to the applicable specifications and drawings, the Contractor will be advised in writing of the areas of nonconformance, and within 7 days the Contractor must correct the deficiencies and advise the Engineer in writing of the corrective action taken.

B. Noncompliance with Quality Control Requirements: Failure of the Contractor to comply with the above requirements may be cause for termination for default as defined in the contract documents.

1.2 Submittals
A. Prior to the start of on-site work, the Contractor must submit to the Engineer a Contractor Quality Control Plan that includes the following information:

1. Procedures for reviewing coordination drawings, shop drawings, certificates, certifications, or other submittals.

2. Testing and inspection schedule, keyed to Construction Schedule, indicating tests and inspections to be performed, names of persons responsible for inspection and testing for each segment of work including preparatory, initial, and follow-up.

3. Proposed forms to be used including Contractor's Daily Report, Contractor Test and Inspection Report and Non-Compliance Check-Off List.

1.3 Quality Control Procedures
A. Monitor quality control over Contractor staff, subcontractors, suppliers, manufacturer's, products, services, site conditions, and workmanship.

B. Comply fully with manufacturer's published instructions, including each step-in sequence of installation.

C. Should manufacturer's published instructions conflict with Contract Documents, request clarification from the Engineer before proceeding.

D. Comply with specified standards as a minimum quality for work, except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Perform work by persons who are thoroughly qualified and trained in their respective trade, to produce workmanship of specified quality.

F. Perform tests required by governing authorities having jurisdiction and utilities having jurisdiction.

1.4 Testing and Inspection Laboratory Services
A. Selection and Payment:

1. The City shall select and pay for services of an Independent Testing and Inspection Laboratory to perform specified testing and inspection.

Page 379 of 805 ends

SECTION 01 4000

QUALITY REQUIREMENTS
City of Montebello 01 4000 - 2
Fire Stations 56
Renovation

2. Employment of Independent Testing and Inspection Laboratory in no way relieves Contractor of obligation to perform work in accordance with requirements of Contract Documents.

B. Quality Assurance:

1. Comply with requirements of all applicable ASTM standards.

2. Laboratory: Authorized to operate in State in which Project is located.

3. Laboratory Staff: Maintain a full-time registered engineer on staff to review services.

4. Testing Equipment: Calibrated at reasonable intervals with devices of and accuracy traceable to either National Bureau of Standards or accepted values of natural physical constraints.

C. Laboratory Responsibilities. Contractor shall ensure the Laboratory has the following responsibilities and limits on authority:

1. Test samples of mixes submitted by Contractor.

2. Provide qualified personnel at Project site. Cooperate with the Engineer and Contractor in performance of services.

3. Perform specified sampling, testing, and inspection of Products in accordance with specified standards.

4. Determine compliance of materials and mixes with requirements of Contract Documents.

5. Promptly notify the Engineer of observed irregularities or non-conformance of work or Products.

6. Submit one copy of all test results directly to the Engineer.

7. Perform additional tests as required by the Engineer.

8. Attend appropriate preconstruction meetings and progress meetings.

D. Limits on Authority. Contractor shall ensure the Laboratory has the following limits on authority:

1. Laboratory may not release, revoke, alter, or expand on requirements of Contract Documents.

2. Laboratory may not approve or accept any portion of work.

3. Laboratory may not assume any duties of Contractors.

4. Laboratory has no authority to stop work.

1.5 Contractor Field Inspection and Testing
A. Contractor: Test and Inspect work provided under this Contract to ensure work is in compliance with Contract requirements. Required tests and inspections are indicated in each individual Specification Section and shall be performed as required by the City inspector.

B. Preparatory Inspection: Performed prior to beginning work and prior to beginning each segment of work and includes:

1. Review of Contract requirements.

2. Review of shop drawings and other submittal data after return and approval.

3. Examination to assure materials and equipment conform to Contract requirements.

4. Examination to assure required preliminary or preparatory work is complete.

C. Initial Inspection: Performed when representative portion of each segment of work is completed and includes:

1. Performance of required tests.

2. Quality of workmanship.

3. Review for omissions or dimensional errors.

4. Examination of products used, connections and supports.

5. Approval or rejection of inspected segment of work.

D. Follow-Up Inspections: Performed daily, and more frequently as necessary, to assure non- complying work has been corrected.

Page 380 of 805 ends

SECTION 01 4000

QUALITY REQUIREMENTS
City of Montebello 01 4000 - 3
Fire Stations 56
Renovation
E. Testing and Inspection: Perform testing and inspection in accordance with requirements in individual Specification Sections.

1.6 Contractor’s Daily Report
A. The Contractor shall maintain daily reports, and provide copies to the Engineer if requested, for days that work was performed. Include the following information:

1. Date, weather, minimum and maximum temperatures, rainfall, and other pertinent weather occurrences.

2. Daily workforce of Contractor and subcontractors, by trades.

3. Description of work started, ongoing work, and work completed by each subcontractor.

4. Coordination implemented between various trades.

5. Approval of substrates received from various trades.

6. Nonconforming and unsatisfactory items to be corrected.

7. Remarks

1.7 Contractor’s Test and Inspection Reports
A. Prepare and submit to the Engineer, a written report of each test or inspection signed by Contractor Quality Control Representative performing inspection within 2 days following day inspection was made.

B. Include the following on written reports of inspection:

1. Cover sheet prominently identifying that inspection "CONFORMS" or "DOES NOT CONFORM" to Contract Documents.

2. Date of inspection and date of report.

3. Project name, location, solicitation number, and Contractor.

4. Names and titles of individuals making inspection, if not Contractor's Project Field Superintendent.

5. Description of Contract requirements for inspection by referencing Specification Section.

6. Description of inspection made, interpretation of inspection results, and notification of significant conditions at time of inspection.

7. Requirements for follow-up inspections.

1.8 Non-Compliance Check-Off List
A. Maintain check-off list of work that does not comply with Contract Documents, stating specifically what is non-complying, date faulty work was originally discovered, and date work was corrected.

No requirement to report deficiencies corrected same day it was discovered. Submit copy of Non- Compliance Check-Off List of non-complying work items to the Engineer on a weekly basis.

1.9 Completion and Inspection of Work
A. Prior to final acceptance by the Engineer and issuance of a Certificate of Substantial Completion and/or Notice of Completion, submit a certification signed by Contractor to the Engineer stating that all work has been inspected and all work, except as specifically noted, is complete and in compliance with Contract Documents.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)

END OF SECTION

Page 381 of 805 ends

SECTION 01 5000

TEMPORARY FACILITIES AND CONTROLS
City of Montebello 01 5000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 General
A. The Contractor must provide all temporary facilities and services required to complete the work and to comply with OSHA and other applicable regulations.

B. The Contractor must maintain temporary facilities in a proper, safe, operating and sanitary condition for the duration of this Contract. Upon completion of this Contract, all such temporary work and facilities shall be removed in their entirety.

1.2 Project Sign
A. The Contractor must construct and erect a minimum of two hard hat signs at locations designated by the Engineer. The signs must be erected prior to the commencement of on-site work.

1.3 Sanitary Provisions
A. The Contractor must provide and keep in neat and sanitary condition conveniences and accommodations for the use of the construction personnel necessary to comply with the requirements and regulations of the local department of health and of other authorities having jurisdiction.

1.4 Approaches and Exits
A. The Contractor must provide all necessary approaches and exits required to properly execute the work.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)

END OF SECTION

Page 382 of 805 ends

SECTION 01 6000

PRODUCT REQUIREMENTS
City of Montebello 01 6000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 Product Options and Substitutions
A. Provide Products that comply with Contract Documents, which are undamaged and new at time of installation.

B. Provide Products complete with accessories, trim, finish, safety guards, and other devices and details needed for complete installation and intended use and effect.

1.2 Product Delivery Requirements
A. Transport and handle Products in accordance with manufacturer's instructions, using means and methods that will prevent damage, deterioration and loss, including theft.

B. Schedule Product delivery to minimize long-term storage at the Project sites and prevent overcrowding of construction spaces.

C. Coordinate Product delivery with installation schedule to assure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

D. Deliver Products to Project site in undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

E. Promptly inspect shipments to ensure that Products comply with project requirements, quantities are correct, Products are undamaged, and properly protected.

F. Provide equipment and personnel to handle Products by methods to prevent soiling, disfigurement, or damage.

1.3 Product Storage and Handling Requirements
A. Store and protect Products in accordance with manufacturers' published instructions, with seals and labels intact and legible.

B. Store Products subject to damage by elements above ground, under cover in weathertight enclosure, with ventilation adequate to prevent condensation. Maintain temperature and humidity within range required by manufacturer's published instructions.

C. For exterior storage of fabricated Products, place on sloped supports, above ground.

D. Provide off-site storage and protection when Project site does not permit on-site storage or protection.

E. Cover Products subject to deterioration with impervious sheet covering. Provide ventilation to avoid condensation or potential degradation of Product.

F. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.

Page 383 of 805 ends

SECTION 01 6000

PRODUCT REQUIREMENTS
City of Montebello 01 6000 - 2
Fire Stations 56
Renovation
G. Provide equipment and personnel to store Products by methods to prevent soiling, disfigurement, or damage.

H. Arrange storage of Products to permit access for inspection. Periodically inspect to verify Products are undamaged and are maintained in acceptable condition.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)

END OF SECTION

Page 384 of 805 ends

SECTION 01 7300

EXECUTION
City of Montebello 01 7300 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 Meetings
A. Prior to issuing the Notice to Proceed, the Engineer will schedule a Pre-Construction Meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination and clarify inspection procedures.

B. Notwithstanding any other provisions of the contract, the Contractor shall not be obligated to perform any work and the City shall not be obligated to accept or pay for any work performed by the Contractor prior to delivery of the Notice to Proceed. The City’s knowledge of work performed prior to the delivery of the Notice to Proceed shall not obligate the City to accept or pay for such work. The Contractor shall provide the required contract bonds and evidences of insurance prior to commencing work at the site.

1.2 Layout of Work
A. The Contractor must lay out its work to match existing or as indicated on the drawings. The Contractor must furnish, at its own expense, all stakes, templates, platforms, equipment, tools, materials, and labor as may be required in laying out any part of the work as indicated on the drawings.

1.3 Contractor's Temporary Use of Facilities and Equipment A. No new facilities or equipment intended for the permanent installation, including materials- handling vehicles, may be used for temporary purposes unless specified in the contract or unless the Contractor has the written permission of the Engineer.

1.4 Cleaning
A. Cleaning During Construction:

1. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.

2. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.

3. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

4. Collect and remove waste materials, debris, and rubbish from site as specified in the Environmental Compliance and Management Plan as required in Section 01 3543 - Environmental Procedures.

B. Final Cleaning:

1. Use cleaning materials and agents recommended by manufacturer or fabricator of surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property, or that might damage finished surfaces.

2. Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit of Work to condition expected from a commercial building cleaning and maintenance program. Comply with manufacturer's published instructions.

3. Complete following cleaning operations before requesting the Engineer’s inspection for Substantial Completion.
a. Clean Project Site, yard and grounds if applicable, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste materials, litter and foreign substances. Sweep paved areas broom clean. Remove petro-chemical

Page 385 of 805 ends

SECTION 01 7300

EXECUTION
City of Montebello 01 7300 - 2
Fire Stations 56
Renovation
spills, stains and other foreign deposits. Rake grounds that are neither planted nor paved, to a smooth even-textured surface.
b. Remove tools, construction equipment, machinery and surplus material from Project Site.
c. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.
d. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics and similar spaces. e. Broom clean concrete floors in unoccupied spaces.
f. Provide final cleaning, waxing, and buffing of resilient tile, in accordance with manufacturer's requirements.
g. Clean transparent materials, including mirrors and glass in doors and windows.

Remove glazing compounds and other substances that are noticeable vision-obscuring materials. Replace chipped or broken glass and other damaged transparent materials. Polish mirrors and glass, taking care not to scratch surfaces. h. Remove labels that are not permanent labels.
i. Touch-up and otherwise repair and restore marred exposed finishes and surfaces.

Replace finishes and surfaces that can not be satisfactorily repaired or restored, or that show evidence of repair or restoration. Do not paint over "UL" and similar labels, including mechanical and electrical name plates.
j. Wipe surfaces of mechanical and electrical equipment, and other similar equipment.

Remove excess lubrication, paint and mortar droppings and other foreign substances.
k. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure.
l. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills. Clean ducts, blowers, and coils if units were operated without filters during construction.
m. Clean light fixtures, lamps, globes and reflectors to function with full efficiency.

Replace burned out bulbs, and defective and noisy starters in fluorescent and mercury vapor fixtures.
n. Leave Project clean and ready for occupancy.

4. Remove temporary protection and facilities installed during construction to protect previously completed installations during remainder of construction.

5. Comply with governing regulations and safety standards for cleaning operations. Remove waste materials from Project Site and dispose of in accordance with requirements of local authorities having jurisdiction.
a. Where extra materials of value remain after completion of construction have become City property, store these materials as directed by the Engineer.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)

END OF SECTION

Page 386 of 805 ends

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
City of Montebello 01 7419 - 1
Fire Stations 56
Renovation
PART 1 GENERAL

1.1 SUMMARY
A. Section includes: Procedures for achieving the most environmentally conscious Work feasible within the limits of the Construction Schedule, Contract Sum, and available materials, equipment, and products.

1. Participate in promoting efforts of the City to create an energy-efficient and environmentally-sensitive structure.

2. Use recycled-content, toxic-free, and environmentally-sensitive materials and equipment.

3. Use environmentally-sensitive procedures.
a. Protect the environment, both on-site and off-site, during demolition and construction operations.
b. Prevent environmental pollution and damage.
c. Effect optimum control of solid wastes.

B. Related Documents: The Contract Documents, as defined in Section 01 1000 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other documents and prevailing City Ordinances.

C. Related Sections:

1. Section 01 4000 - Quality Requirements: Contractor's Daily Report.

2. Section 01 5000 - Temporary Facilities And Controls: Temporary ventilation, progress cleaning and waste removal.

3. Section 01 6000 - Product Requirements: Substitutions.

4. Section 02 4119 – Selective Structure Demolition.

1.2 DEFINITIONS
A. Adequate ventilation: Ventilation, including air circulation and air changes, required to cure materials, dissipate humidity, and prevent accumulation of dust fumes, vapors, or gases.

B. Construction and demolition waste: Includes solid wastes, such as building materials, packaging, rubbish, debris, and rubble resulting from construction, remodeling, repair, and demolition operations.

1. Rubbish: Includes both combustible and noncombustible wastes, such as paper, boxes, glass, crockery, metal and lumber scrap, metal cans, and bones.

2. Debris: Includes both combustible and noncombustible wastes, such as leaves and tree trimmings that result from construction or maintenance and repair work.

C. Chemical waste: Includes petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals, and inorganic wastes.

D. Diversion: Redirection of waste ordinarily deposited in a municipal landfill to a recycling facility or to another destination for reuse.

E. Environmental pollution and damage: The presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances; or degrade the utility of the environment for aesthetic, cultural, or historical purposes.

F. Hazardous materials: Includes pesticides, biocides, and carcinogens as listed by recognized authorities, such as the Environmental Protection Agency (EPA) and the International Agency for Research on Cancer (IARC).

Page 387 of 805 ends

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
City of Montebello 01 7419 - 2
Fire Stations 56
Renovation
G. Interior final finishes: Materials and products that will be exposed at interior, occupied spaces; including flooring, wallcovering, finish carpentry, and ceilings.

H. Municipal Solid Waste Landfill: A permitted facility that accepts solid, non-hazardous waste such as household, commercial, and industrial waste, including construction and demolition waste.

I. Packaged dry products: Materials and products that are installed in dry form and are delivered to the site in manufacturer's packaging; including carpets, resilient flooring, ceiling tiles, and insulation.

J. Sediment: Soil and other debris that has been eroded and transported by storm or well production runoff water.

K. Sanitary wastes:

1. Garbage: Refuse and scraps resulting from preparation, cooking, distribution, or consumption of food.

2. Sewage: Domestic sanitary sewage.

L. Wet products: Materials and products installed in wet form, including paints, sealants, adhesives, and special coatings.

1.3 SUBMITTALS
A. Solid Waste Management and Environmental Protection Plan: Prepare and submit at the Preconstruction Meeting a Solid Waste Management and Environmental Protection Plan including, but not limited to, the following:

1. Procedures for Recycling/Re-Use Program in compliance with the City recycling code.

2. Schedule for application of interior finishes.

3. Revise and resubmit Solid Waste Management and Environmental Protection Plan as required by the City.
a. Approval of the Contractor's Solid Waste Management and Environmental Protection Plan, will not relieve the Contractor of responsibility for adequate and continuing control of pollutants and other environmental protection measures.

B. With each Contractor's Report as specified in Section 01 4000 – Quality Requirements, submit an updated Summary Of Solid Waste Disposal And Diversion. Submit on form in Appendix A of this Section. Include manifests, weight tickets, receipts, and invoices specifically identifying the Project and waste material for:

1. Municipal Solid Waste Landfills.

2. Recycling/Reuse Facilities.

C. With Record Submittals as specified in Section 01 7704 - Closeout Procedures and Training, submit the following:

1. Final Summary Of Solid Waste Disposal And Diversion. Submit on form in Appendix A of this Section.

2. Resource Conservation and Recovery Act Project Summary. Submit on form in Appendix B of this Section.

PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION

3.1 RECYCLING AND REUSE

Page 388 of 805 ends

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
City of Montebello 01 7419 - 3
Fire Stations 56
Renovation
A. Collection: Implement a recycling/reuse program that includes separate collection of waste materials of the following types as appropriate to local and regional recycling/reuse facilities:

1. Concrete.

2. Metal.

3. Wood.

4. Debris.

5. Glass.

6. Carpet.

7. Paper/Cardboard.

8. Plastic.

9. Gypsum.

10. Paint.

11. Others as appropriate.

B. Recycling/reuse centers: Contact governmental solid waste offices, Environmental Protection Agency (EPA) regional offices, and applicable non-profit organizations.

1. Concrete.

2. Metal.

3. Wood.

4. Debris.

5. Glass.

6. Carpet.

7. Paper/Cardboard.

8. Plastic.

9. Gypsum.

10. Paint.

11. Others as appropriate.

C. Handling:

1. Clean materials which are contaminated prior to placing in collection containers. Deliver materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to recycling process.

2. Arrange for collection by or delivery to the appropriate recycling or reuse facility.

D. Participate in re-use programs: identify local and regional re-use programs, including but not limited to non-profit organizations such as schools, local housing agencies, and public arts programs, that accept used materials. The following are examples for contractor's information only.

1. National materials exchange network, such as CAL-MAX a free service provided by various state and regional offices, designed to help businesses find markets for materials that traditionally would be discarded. The premise of the program is that material discarded by one business may be a resource for another business.
a. Items and regions covered by materials exchange programs may vary. Contact the applicable regional materials exchange program. In California, contact CAL-MAX at (916) 255-2369.

2. Habitat For Humanity, a non-profit housing organization that rehabilitates and builds housing for low income families.
a. Sites requiring donated materials vary. Contact the national hotline (800) HABITAT.

E. Rebates, tax credits, and other savings obtained for recycled or re-used materials accrue to Contractor.

3.2 ENVIRONMENTAL CONTROLS
A. Protection of natural resources: Preserve the natural resources within the Project boundaries and outside the limits of permanent Work performed under this Contract in their existing condition or

Page 389 of 805 ends

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
City of Montebello 01 7419 - 4
Fire Stations 56
Renovation
restore to an equivalent or improved condition as approved by the Engineer, upon completion of the Work.

1. Confine demolition and construction activities to work area limits indicated on the Drawings and as directed by the Engineer.
a. Temporary construction: As specified in Section 01 5000 - Temporary Facilities And Controls.
b. Demolition and salvage operations: As specified in Section 02 4119 - Selective Structure Demolition.
c. Disposal operations for demolished and waste materials that are not identified to be salvaged, recycled or reused:
1) Remove debris, rubbish, and other waste materials resulting from demolition and construction operations, from site.
2) No burning permitted.
3) Transport materials with appropriate vehicles and dispose off-site to areas which are approved for disposal by governing authorities having jurisdiction. 4) Avoid spillage by covering and securing loads when hauling on or adjacent to public streets or highways. Remove spillage and sweep, wash, or otherwise clean project site, streets, or highways.
5) Comply with applicable regulations.

2. Water resources as follows:
a. Comply with requirements of the National Pollutant Discharge Elimination System (NPDES) and the State Pollutant Discharge Elimination System (SPDES). b. Oily substances: Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water.
1) Store and service construction equipment at areas designated for collection of oil wastes.
c. Mosquito abatement: Prevent ponding of stagnant water conducive to mosquito breeding habitat.
d. Prevent run-off from site during demolition and construction operations.

3. Land resources: Prior to construction, identify land resources to be preserved within the Work area. Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, top soil, and land forms without permission from The City.

4. Air Resources: Prevent creation of dust, air pollution, and odors. a. Use water sprinkling, temporary enclosures, and other appropriate methods to limit dust and dirt rising and scattering in air to lowest practical level. 1) Do not use water when it may create hazardous or other adverse conditions such as flooding and pollution.
b. Store volatile liquids, including fuels and solvents, in closed containers. c. Properly maintain equipment to reduce gaseous pollutant emissions. d. Interior final finishes: Schedule construction operations involving wet products prior to packaged dry products to the greatest extent possible in accordance with The City approved Solid Waste Management and Environmental Protection Plan. e. Temporary Ventilation: As specified in Section 01 5000 - Temporary Facilities And Controls, and as follows:
1) Provide adequate ventilation during and after installation of interior wet products and interior final finishes.
2) Provide adequate ventilation of packaged dry products prior to installation.

Remove from packaging and ventilate in a secure, dry, well-ventilated space free from strong contaminant sources and residues. Provide a temperature range of 60 degrees F minimum to 90 degree F maximum continuously during the ventilation period. Do not ventilate within limits of Work unless otherwise approved by City Engineer.
f. Pre-occupancy ventilation: After final completion and prior to initial occupancy, provide adequate ventilation for minimum 5 days. Pre-occupancy ventilation procedures:
1) Use supply air fans and ducts only;

Page 390 of 805 ends

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
City of Montebello 01 7419 - 5
Fire Stations 56
Renovation
2) Temporarily seal exhaust ducts;
3) Temporarily disable exhaust fans;
4) Provide exhaust through operable windows or temporary openings. 5) Provide temporary exhaust fans as required to pull exhaust air from deep interior locations. Stair towers may be used for exhausting air from the building during the temporary ventilation.
6) After pre-occupancy ventilation and prior to final testing and balancing of HVAC system, replace air filters and make HVAC system fully operational.

5. Noise Control: Perform demolition and construction operations to minimize noise.

Perform noise producing work in less sensitive hours of the day or week as directed by the Engineer .
a. Repetitive, high level impact noise will be permitted only between the hours permitted in the City Noise Ordinance. Do not exceed the limitations specified by OSHA. b. Provide equipment, sound-deadening devices, and take noise abatement measures that are necessary for compliance.

END OF SECTION

Page 391 of 805 ends

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
City of Montebello 01 7419 - 6
Fire Stations 56
Renovation
Appendix A

SUMMARY OF SOLID WASTE DISPOSAL AND DIVERSION
Project Name:

Contractor Name: License Number:

Contractor Address:

Solid Waste Date Amount Municipal Solid Recycling/Reuse Comments
Material Material Disposed/ Waste Facility Facility (if disposed, Disposed/ Diverted (name, address, & (name, address, & state why Diverted (ton or cu.yd) phone number) phone number)not diverted) Concrete
Metal
Wood
Debris
Glass
Carpet
Paper/
Cardboard
Plastic
Gypsum
Paint
Other:

Signature: Date:

Page 392 of 805 ends

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
City of Montebello 01 7419 - 7
Fire Stations 56
Renovation
Appendix B
RESOURCE CONSERVATION AND RECOVERY ACT - PROJECT SUMMARY.

Project Name:

Contractor Name: License Number:

Contractor Address:

1.0 EPA GUIDELINE ITEMS
A. Fly Ash:

1. Total dollar amount of concrete and cement provided for this project. $__________________.

2. Total dollar amount of concrete and cement containing fly ash provided for this project. $__________________.

3. Were there any technical impediments to increasing the amount of concrete and cement containing fly ash provided for this project? _________________. a. If yes, please explain.
.

B. Building Insulation Products:

1. Total dollar amount of building insulation products provided for this project. $__________________.

2. Total dollar amount of building insulation products containing recycled materials provided for this project. $__________________.

3. Were there any technical impediments to increasing the amount of building insulation products containing recycled materials provided for this project? _________________. a. If yes, please explain.
.

C. Carpet:

1. Total dollar amount of carpet provided for this project. $__________________.

2. Total dollar amount of carpet containing recycled materials provided for this project. $__________________.

3. Were there any technical impediments to increasing the amount of carpet containing recycled materials provided for this project? _________________. a. If yes, please explain.
.

Page 393 of 805 ends

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
City of Montebello 01 7419 - 8
Fire Stations 56
Renovation
D. Floor Tiles (ceramic):

1. Total dollar amount of floor tile (ceramic) provided for this project. $__________________.

2. Total dollar amount of floor tile (ceramic) containing recycled materials provided for this project. $__________________.

3. Were there any technical impediments to increasing the amount of floor tile (ceramic) containing recycled materials provided for this project? _________________. a. If yes, please explain.
.

2.0 SPECIFICATIONS - NOT USED

3.0 SOLID WASTE PREVENTION
A. Total dollar amount of solid waste disposed (landfill) for this project. $__________________.

B. Total weight of solid waste disposed (landfill) for this project. $__________________.

4.0 RECYCLING
A. Total dollar value of solid waste diverted from landfill and recycled or reused for this project. (Express as total dollar amount for solid waste disposal in landfill for equivalent type and amount of diverted waste.) $__________________.

B. Total weight of solid waste diverted from landfill and recycled or reused for this project. (Express as total weight for solid waste disposal in landfill for equivalent type and amount of diverted waste.) $__________________.

5.0 COMMENTS
A. Comments and suggestions for increasing amount of recycled materials used in construction materials.

B. Comments and suggestions for improving solid waste prevention and recycling efforts during construction.

Signature: Date:

Page 394 of 805 ends

SECTION 01 7704

CLOSEOUT PROCEDURES AND TRAINING
City of Montebello 01 7704 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 Manuals
A. Purpose: Operation and maintenance manuals are for the training of, and use by, City employees in the operation and maintenance of the systems and related equipment as specified below. The manuals must consist of instruction on systems and equipment. A separate manual or chapter must be prepared for each of the following classes of equipment or system:

1. Doors & Windows.

2. Plumbing systems.

3. Electrical systems.

4. Miscellaneous building equipment and systems.

B. Submittal, In both “hard” and electronic DVD, CD-ROM or flash drive format:

1. Preliminary Submittal: Two draft copies of the completed manuscript for items in this outline must be submitted to the City Engineer for review within 30 days after approval of equipment to be provided. One copy will be returned to the Contractor within 15 days after submittal and, if required, must be revised and resubmitted within 15 days.

2. Final Submittal: four complete sets of manuals must be furnished to the Engineer not later than 30 days before completion of the project.

3. Final Submittal must be accepted by the Engineer before training can begin.

1.2 Other Closeout Submittals
A. Additional requirements for Systems Manuals, Operating Instructions, Warranties, Training and other deliverables are contained in individual Specification Sections. All closeout requirements must be provided to and accepted by the Engineer prior to requesting final payment. Examples of additional closeout requirements include, but are not limited to, the following

1. Final Punch-List with all items certified as complete.

2. Record “As Built” Drawings, the Contractor shall submit certified As-Built Record Drawings and Specifications in the quantities and media specified.

3. Warranty, the Contractor shall submit all transferable guarantees and warranties for equipment, materials and installations furnished by any manufacturer, supplier, or installer.

4. Signed Asbestos and Lead-Based Paint Certificate.

5. Survey Report.

6. Material Safety Data Sheets

7. Signed and sealed Contractor Release of Claims.

8. Payment for items of work covered in the plans specifications Division 1 will be based on the lump sum unit bid price for mobilization. No additional compensation will be allowed.

1.3 MAINTENANCE
A. Extra Materials – Paint, Rubber Base, Porcelain Tile, Luxury Vinyl Composite Tile, or similar finishes: Full-size units equal to five (5%) percent of amount installed for each type, and color, pattern, and dyes. Provide extra material not noted here but reference in other specifications for this project.

PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)

END OF SECTION

Page 395 of 805 ends

SECTION 02 4119

SELECTIVE STRUCTURE DEMOLITION
City of Montebello 01 4119 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Procedures for demolition and removal of existing building elements.

2. Removal of designated building equipment and fixtures.

3. Salvaged items.

4. Salvaged material.

5. Salvaged items for re-use.

B. Related Documents: The Contract Documents, as defined in Section 01 1000- Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other documents.

C. Related Sections:

1. Section 01 3543 - Environmental Procedures: Recycling and reuse of waste materials.

1.2 SYSTEM DESCRIPTION
A. The extent of Selective Demolition Work is that Work necessary, and required to facilitate the new construction indicated.

B. Demolition shall be such that all construction, new and existing, can be performed, and completed in accordance with the construction documents.

C. The contractor shall visit the project site and familiarize himself with the existing conditions and project requirements.

D. Verify the scope of the Work under this Section including salvage material. The City will be responsible for removing all materials and equipment which the City wishes to salvage prior to the beginning of this Work. The Fire Department will be using areas on the project site for storage.

These areas shall be protected from damage during construction and no access to them will be available to contractor during construction. City to provide list of areas being used for storage prior to construction OR at the pre-construction meeting.

1.3 QUALITY ASSURANCE
A. Performance Criteria:

1. Requirements of Structural Work: Do not cut structural work in a manner resulting in a reduction of load-carrying capacity of load/deflection ratio.

2. Operational and Safety Limitations: Do not cut operational elements and safety-related components in a manner resulting in a reduction of capacities to perform in a manner intended or resulting in a decreased operational life, increased maintenance or decreased safety.

3. Visual Requirements: Do not cut work which is exposed on the exterior or exposed in occupied spaces of the building in a manner resulting in a reduction of visual qualities or resulting in substantial evidence of the demolition work judged by the Engineer to be cut and patched in a visually unsatisfactory manner.

4. Loading: Do not superimpose loads at any point upon existing structure beyond design capacity including loads attributable to materials, construction equipment, demolition operations and shoring and bracing.

Page 396 of 805 ends

SECTION 02 4119

SELECTIVE STRUCTURE DEMOLITION
City of Montebello 01 4119 - 2
Fire Stations 56
Renovation

5. Vibration: Do not use means, methods, techniques or procedures which would induce vibration into any element of the structure.

6. Fire: Do not use means, methods, techniques or procedures which would produce any fire hazard unless otherwise approved by the Engineer.

7. Water: Do not use means, methods, techniques or procedures which would produce excessive water run-off, and water pollution.

8. Air Pollution: Do not use means, methods, techniques or procedures which would produce uncontrolled dust, fumes or other damaging air pollution.

1.4 PROJECT SITE
A. Indicated "Existing Construction" was obtained from existing drawings or other information which may not reflect actual conditions. The Contractor shall verify all existing conditions and notify the Engineer of discrepancies before proceeding with the Work.

B. Perform the removal, cutting, drilling, etc., of existing work with extreme care, and using small tools in order not to jeopardize the structural integrity of the building.

C. Occupancy: Contractor shall have full use of the facility during construction. After or prior to construction, the contractor shall schedule and work around the Fire Department schedule. There will be no access to the existing equipment bay (Apparatus Room) except to place threshold ramps as noted on the renovation plan & new wall.

D. Condition of Structure: The City assumes no responsibility for the actual condition of portions of the structure to be demolished.

E. Partial removal: Items of salvageable value to the Contractor may be removed from the structure as the work progresses if not claimed by the City. Salvaged items must be transported from the site as they are removed.

F. Protection: Make sure that the safe passage of persons around the area of demolition is maintained during the demolition operation. Conduct operations to prevent injury to adjacent buildings, structures, other facilities, and persons.

1.5 PROTECTION OF EXISTING CONSTRUCTION
A. Provide temporary protection of existing construction (floors, roof, and walls) when adjoining new work and in traffic areas.

B. Provide temporary construction, constructed of framing and plywood, to protect existing construction and surrounding surfaces from damage by movement of materials and personnel.

C. The contractor is responsible for all damage to existing structure and shall replace or repair all areas of damage.

D. Repair, replace, or rebuild existing construction as required or as directed which has been removed, altered or disrupted to allow for new construction. Existing construction shall be corrected to match adjacent construction, new or existing.

E. Perform cutting of existing concrete and masonry construction with saws and core drills. Do not use jack-hammers or explosives.

Page 397 of 805 ends

SECTION 02 4119

SELECTIVE STRUCTURE DEMOLITION
City of Montebello 01 4119 - 3
Fire Stations 56
Renovation

1.6 SHORING AND BRACING
A. Provide temporary shoring of existing construction to allow removal of existing structural elements. Maintain shoring until new structural elements are in place and accepted by the Engineer and City Inspector(s).

PART 2 - PRODUCTS

2.1 SALVAGED MATERIALS
A. The Contract Documents indicate the existing materials that are to be reinstalled in the new construction. The Contractor shall remove, protect and reinstall these items as indicated.

1. Items for "Reinstallation" will be indicated as such within the Contract Documents.

B. Removed and salvaged materials of value not designated for reinstallation, unless claimed as salvage by the City, shall become the property of the Contractor and shall be removed from the premises by the Contractor and recycled, reused or disposed of as specified in Section 01 3543- Environmental Procedures.

C. The City will remove or, under separate contract, have all materials and equipment which the City requires removed prior to Work under this Section begins.

2.2 SALVAGED ITEMS FOR RE-USE
A. Materials and items scheduled for re-use which are damaged by the contractor to the extent which they cannot be re-used shall be replaced by the Contractor at no additional cost to the City.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Section 01 7300 - Execution: Verification of existing conditions before starting work.

B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.

C. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected and approved by the Engineer.

D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.

3.2 PREPARATION
A. Temporary Support: Provide adequate temporary support for work to be cut to prevent failure.

Do not endanger other work.

Page 398 of 805 ends

SECTION 02 4119

SELECTIVE STRUCTURE DEMOLITION
City of Montebello 01 4119 - 4
Fire Stations 56
Renovation
B. Provide adequate protection of other work during selective demolition to prevent damage and provide protection of the work from adverse weather exposure.

3.3 PROCEDURE
A. Employ only skilled tradesmen to perform selective demolition.

B. Cut work by methods least likely to damage work to the retained and work adjoining.

C. In general, where physical cutting action is required, cut work with sawing and grinding tools, not with hammering and chopping tools. Core drill openings through concrete and masonry work.

D. Patch with seams which are durable and as invisible as possible. Comply with specified tolerances for the work.

E. Where selective demolition terminates at a surface or finish to remain, completely remove all traces of material selectively demolished, including mortar beds. Provide smooth, even, substrate transition.

3.4 POLLUTION CONTROLS
A. Use temporary enclosures and other suitable methods to limit the amount of dust and dirt rising and scattering in the air to the lowest practical level. Comply with AQMD standards.

B. Comply with governing authorities pertaining to environmental protection.

1. Protect natural resources as specified in Section 01 3543 - Environmental Procedures.

C. Clean adjacent portion of the structure and improvement of dust, dirt and debris caused by demolition operations, as directed by the Engineer and governing authorities. Return adjacent areas to its condition prior to the start of the work.

3.5 DISPOSAL OF DEMOLISHED MATERIALS
A. Collect, recycle, reuse, and dispose of demolished materials as specified in Section 01 3543 - Environmental Procedures and as approved by the City in the Solid Waste Management and Environmental Protection Plan.

3.6 SCHEDULE OF SELECTIVE DEMOLITION
A. Slab on Grade:

1. Where indicated, saw cut perimeter of existing slab minimum of 50 percent of slab thickness to provide a breaking point to remove existing concrete.

2. Break concrete slab to be removed into portions easily removed, maximum 3-foot dimensions in any side.

3. Remove all concrete pieces within removed area down to the existing subgrade.

B. Plumbing:

1. Remove all plumbing fixtures and accessories including all exposed supply, waste, and vent piping.

2. Concealed piping within and below slab construction shall be identified, and capped a minimum of 3 inches (8 cm) below finish floor.

Page 399 of 805 ends

SECTION 02 4119

SELECTIVE STRUCTURE DEMOLITION
City of Montebello 01 4119 - 5
Fire Stations 56
Renovation
C. Electrical Service:

1. All electrical circuits within the existing structure shall be abandoned from the existing service entrance section, beyond.

2. Remove all abandoned electrical conduit, boxes, and wiring back to the existing electrical service which is to remain.

D. Provide additional selective demolition as indicated and required by the Contract Documents and as required for indicated new construction.

E. Items for demolition covered under the plans and these specifications include carpet, rubber base, build-in furniture, plumbing features, F.A.U. concrete slab saw cut, cap utilities, remove interior walls, some doors, selective demolition plus asbestos abatement.

F. Payment for items of work covered in the plans and Division 2 specification will be based on the lump sum bid price for building demolition and removals, no additional compensation will be allowed.

END OF SECTION

Page 400 of 805 ends

SECTION 03 2000

CONCRETE REINFORCEMENT
City of Montebello 03 2000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Reinforcing steel bars.

2. Reinforcement accessories.

B. Related Documents: The Contract Documents, as defined in Division 1 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other documents.

C. Related Sections:

1. Section 03 3000 - Cast-in-Place Concrete: Coordination between concrete placement and reinforcing.

1.2 REFERENCES
A. American Concrete Institute (ACI):

1. ACI 301 - Structural Concrete for Buildings.

2. ACI 318 - Building Code Requirements for Reinforced Concrete.

3. ACI SP-66 - American Concrete Institute - Detailing Manual.

B. American Society for Testing and Materials (ASTM):

1. ASTM A 184 - Fabricated Deformed Steel Bar Mats for Concrete Reinforcement.

2. ASTM A 615 - Deformed and Plain Billet Steel Bars for Concrete Reinforcement.

3. ASTM A 704 - Welded Steel Plain Bar or Rod Mats for Concrete Reinforcement.

C. American Welding Society (AWS):

1. AWS D 1.4 – Structural Welding Code for Reinforcing Steel.

D. Concrete Reinforcing Steel Institute (CRSI):

1. CRSI - Manual of Practice.

2. CRSI 63 - Recommended Practice for Placing Reinforcing Bars.

3. CRSI 65 - Recommended Practice for Placing Bar Supports, Specifications and Nomenclature.

1.3 SUBMITTALS
A. Submittal Procedures:

1. Shop Drawings: Indicate bar sizes, spacing’s, locations, and quantities of reinforcing steel [and wire fabric, bending and cutting schedules, and supporting and spacing device.

Include special reinforcement required for openings through concrete structures.

2. Assurance/Control Submittals;
a. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
b. Submit certified copies of mill test report of reinforcement materials analysis.

3. Weld Procedure Specifications: Provide for bars to be welded in accordance with AWS D1.4-11

Page 401 of 805 ends

SECTION 03 2000

CONCRETE REINFORCEMENT
City of Montebello 03 2000 - 2
Fire Stations 56
Renovation

4. All WPS’s shall be submitted to the Structural Engineer of Record (SEOR) for review and approval prior to use.

5. For WPS’s that have been qualified by test, the supporting Procedure Qualification Record (PQR) shall be submitted to the Engineer for review and approval.

1.4 QUALITY ASSURANCE
A. Perform Work in accordance with CRSI 63, 65 and Manual of Practice ACI 301, ACI SP-66, ACI 318, and ASTM A 184.

B. Reinforcement design is provided by the Structural Engineer of Record, experienced in design of this work and licensed in the State where the Project is located.

C. Source Quality Control: Testing Laboratory shall perform following conformance testing, shall select test samples of bars, ties, and stirrups from the material at the site or from place of distribution, each sampling including at least two 18” long pieces, and perform the following tests in accordance with ASTM A706.

D. Identified Bars: If samples are obtained from bundles as delivered from the mill, identified as to heat number, accompanied by mill analyses and mill test reports, and properly tagged with Identification Certificate so as to be readily identified, perform one tensile and one bend test for each 10 tons or fraction thereof of each size of bars. Submit mill reports when samples are selected.

E. Unidentified Bars: When positive identification of reinforcing bars cannot be made and when random samples are obtained; perform tests for each 2.5 tons or fraction thereof, one tensile and one bend test from each size of bars.

F. Certification of Welders: All welding both in shop and in field shall be performed by certified welding operators per AWS D1.4.

1.5 DELIVERY, STORAGE AND HANDLING
A. Comply with pertinent provisions of Division 01 Section 01 6000 “Product Requirements,” delivering materials in a timely manner to ensure uninterrupted progress.

B. Bundle bars, tag with identification and transport and store so as not to damage any material. Use metal tags indicating size, length and other marking shown on placement drawings. Maintain tags after bundles are broken.

1.6 EXTRA MATERIAL:

A. Provide an allowance of an additional 10% of the total reinforcing steel tonnage in addition to quantities shown on drawings. This additional steel shall be installed at the discretion of, and in the locations directed by the Structural Engineer. Provide unit price for the purpose of adjusting contract price to reflect quantity of extra material actually used. All unused material shall be credited to the owner based upon the agreed unit prices.

PART 2 - PRODUCTS

2.1 STEEL REINFORCEMENT
A. Reinforcing Steel: ASTM A 706, 60 ksi yield grade; deformed billet steel bars, unfinished.

B. Reinforcing bars for welding: ASTM A706, Grade 60.

Page 402 of 805 ends

SECTION 03 2000

CONCRETE REINFORCEMENT
City of Montebello 03 2000 - 3
Fire Stations 56
Renovation
C. Reinforcing mesh: ASTM A185, mesh size and gauge as shown 60 ksi minimum tensile strength.

Provide mesh in flat sheets only.

D. Tie wire: ASTM A82, Annealed copper-bearing steel, 16 gauge minimum.

E. Chairs and similar support items:

1. Standard manufactured products conforming to Concrete Reinforcing Steel Institute, “Manual of Standard Practice”, latest edition.

F. Use dense precast concrete supports with embedded wire ties for reinforcement placed on grade.

Elsewhere, use wire bar supports.

G. Welding electrodes: AWS D1.4-11, Table 5.1 and Table 5.3, low hydrogen electrodes, E8018 for A706 Grade 60 steel.

2.2 ACCESSORIES
A. Tie Wire: Minimum 16 gage annealed type.

B. Chairs, Bolsters, Bar Supports, and Spacers: Sized and shaped for strength and support of reinforcement during concrete placement conditions including load bearing pad on bottom to prevent vapor barrier puncture.

C. Special Chairs, Bolsters, Bar Supports, and Spacers Adjacent to Weather Exposed Concrete Surfaces: Plastic coated steel type (CRSI, Class 1) or stainless steel protected (CRSI, Class 2); size and shape as required.

2.3 FABRICATION
A. Comply with Concrete Reinforcing Steel Institute (CRSI), “Manual of Standard Practice”, latest edition, for fabrication of reinforcing steel.

B. Bending and Forming: Fabricate bars of the indicated sizes and bend and form to required shapes and lengths by methods not injurious to materials. Do not heat reinforcement for bending.

Bend bars No. 6 size and larger in the shop only. Bars with unscheduled kinks or bends are subject to rejection. Use only tested and approved bar materials.

C. Welding: Use only ASTM A706 steel where welding is proposed. Perform welding, where shown or approved, by the direct electric arc process in accordance with AWS D1.4-11 using specified low-hydrogen electrodes. Preheat 6” each side of joint. Protect joints from drafts during the cooling process; accelerated cooling is prohibited. Do not tack weld bars. Welding shall not be done on or within two bar diameters of any bend portion of the bar that has been bent cold.

Welding of crossing bars shall not be permitted for assemble of reinforcement unless authorized by the Engineer. Clean metal surfaces to be welded of all loose scale and foreign material. Clean welds each time electrode is changed and chip burned edges before placing welds. When wire brushed, the completed welds must exhibit uniform section, smooth welded metal, feather edges without undercuts or overlays, freedom from porosity and clinkers, and good fusion and penetration into the base metal. Cut out welds or parts of welds found defective with chisel and replace with proper welding. Fillet welds may be considered prequalified per AWS D1.4, section

6.1.2. Other welds are to be qualified per AWS D1.4, section 6.1.2. . Where ASTM A615 steel is to be used or occurs in existing elements and is to be welded, complete chemical analyses shall be performed to determine chemical composition and, for new bar, provided in the mill certifications to determine weldability in accordance with ACI 318 Section 3.5.2 with modifications per AWS D1.4. The carbon equivalency (CE) shall be clearly defined and bars with a CE above

0.75 shall not be welded. Welding Procedure Specifications and supporting Procedure Qualification Records with required testing per AWS D1.4, shall be provided for review and approval prior to welding. These WPS’s and PQR’s shall be specific to the CE as determined above, and shall, in addition to the other AWS requirements, include minimum and maximum preheat and interpass temperatures that are specific to the CE. This preheat and interpass

Page 403 of 805 ends

SECTION 03 2000

CONCRETE REINFORCEMENT
City of Montebello 03 2000 - 4
Fire Stations 56
Renovation
temperature shall be strictly enforced in the field. If separate shipments of bars vary the weldability, the process listed in the requirements above shall be repeated for these new bars.

D. Prequalification of welds shall be in accordance with AWS D1.4.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Verification of Conditions: Verify that field measurements, surfaces, and conditions are as required, and ready to receive Work.

B. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected.

C. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.

3.2 PLACEMENT
A. Place, support and secure reinforcement against displacement. Do not deviate from required position.

B. Do not displace or damage vapor barrier.

C. Accommodate placement of formed openings.

D. Maintain concrete cover around reinforcing in accordance with ACI 318.

3.3 FIELD QUALITY CONTROL
A. Section 01 4000 - Quality Requirements: Field inspection.

B. Inspect reinforcing locations, bar types and sizes, wire ties, and welding (if applicable).

END OF SECTION

Page 404 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 SUMMARY
A. Includes all labor, materials and appliances, and perform all operations in connection with the installation of Concrete Work, and all related work incidental to the completion thereof, as shown on the drawings, complete, in strict accordance with the drawings and as specified herein. Section Includes:

1. Cast-in-place (CIP) concrete in building.

2. Finishing of concrete floor slabs and toppings. Concrete liquid surface treatment, sealer, and slip-resistant coatings.

3. Expansion and contraction, control joints in CIP concrete.

4. Concrete curing and protection.

B. Related Documents: The Contract Documents, as defined in Division 1 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents and References in Section 1.2.

C. Related Sections: Related work specified elsewhere includes but may not be limited to

1. Section 03 2000 - Concrete Reinforcement.

1.2 REFERENCES
A. General:

1. The publications listed below form a part of this specification to the extent referenced.

2. For reference standards, the latest edition available on the date of Notice Inviting Bids shall be used.

B. Unless otherwise shown or specified, the work shall conform to the following standards and recommendations of the American Concrete Institute (ACI), latest editions adopted:

1. ACI 117, “Standard Specification for Tolerances for Concrete Construction and Materials.”

2. ACI 121R, “Quality Assurance Systems for Concrete Construction.”

3. ACI211.1, “Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete.

4. ACI 212.2R, “Guide for Use of Admixtures in Concrete.”

5. ACI 214, “Recommended Practice for Evaluation of Strength Test Results of Concrete.”

6. ACI 301, “Specification for Structure /Concrete.”

7. ACI 302.1R, “Guide for Concrete Floor and Slab Construction.”

8. ACI 304R, “Guide for Measuring, Mixing, Transporting, and Placing Concrete.”

9. ACI 304.2-R, "Placing Concrete by Pumping Methods."

10. ACI 305, “Hot Weather Concreting.”

11. ACI 306, “Cold Weather Concreting.”

12. ACI 306.1 “Standard Specification for Cold Weather Concreting.”

13. ACI 308, “Standard Practice for Curing Concrete.”

14. ACI 309R, “Guide for Consolidation for Concrete.”

15. ACI 315, “Details and Detailing of Concrete Reinforcement.”

16. ACI 318, “Building Code Requirements for Structural Concrete.”

17. ACI 347, “Guide to Formwork for Concrete.”

18. ACI 347.2R “Guide for Shoring/Reshoring of Concrete Multistory Buildings.”

Page 405 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 2
Fire Stations 56
Renovation

19. ACI 503.2, “Standard Specification for Bonding Plastic Concrete to Hardened Concrete with a Multi-Component Epoxy Adhesive.”

20. ACI SP-15, "Field Reference Manual" which includes ACI 301 "Specifications for Structural Concrete for Buildings" and reference standards specified therein.

C. American Welding Society (AWS)

1. AWS D1.4, "Structural Welding Code Reinforcing."
D. American Society for Testing and Materials (ASTM).

1. ASTM A615, "Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement."

2. ASTM C31, “Standard Practice for Making and Curing Concrete Test Specimens in the Field.”

3. ASTM C33, "Standard Specification for Concrete Aggregates."

4. ASTM C39, "StandardTest Method for Compressive Strength of Cylindrical Concrete Specimens."

5. ASTM C42, “Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.”

6. ASTM C94, "Standard Specification for Ready-Mixed Concrete."

7. ASTM C109, “Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube Specimens)”

8. ASTM C114, "Standard Test Method for Chemical Analysis of Hydraulic Cement."

9. ASTM C138, "Standard Test Method for Unit Weight, Yield, and Air Content of Concrete (Gravimetric) of Concrete."

10. ASTM C143, "Standard Test Method for Slump of Hydraulic Cement-Cement Concrete."

11. ASTM C150, "Standard Specification for Portland Cement."

12. ASTM C156, "Standard Test Method for Water Retention by Concrete Curing Materials."

13. ASTM C171, "Standard Specification for Sheet Materials for Curing Concrete."

14. ASTM C173, "Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method."

15. ASTM C231, "Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method."

16. ASTM C260, "Standard Specification for Air Entraining Admixtures for Concrete."

17. ASTM C309, "Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete.”

18. ASTM C311, “Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use as a Mineral Admixture in Portland-Cement Concrete.”

19. ASTM C387, "Standard Specification for Packaged, Dry, Combined Materials for Mortars and Concrete."

20. ASTM C457, “Standard Test Method for Microscopical Determination of Parameters of the Air-Void System in Hardened Concrete.”

21. ASTM C494, "Standard Specification for Chemical Admixtures for Concrete."

22. ASTM C618, "Standard Specification for Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete."

23. ASTM C920, “Standard Specification for Elastomeric Joint Sealants.”

24. ASTM C685, "Standard Specification for Concrete Made by Volumetric Batching and Continuous Mixing.”

25. ASTM C989, “Standard Specification for Ground Granulated Blast-Furnace Slag for Use in Concrete and Mortars.”

26. ASTM C1260, “Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method).”

27. ASTM C1567, “Standard Test Method for Potential Alkali Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method).”

28. ASTM E154, "Standard Test Methods for Water Vapor Retarders Used in Contact with Earth Under Slabs, On Walls, or as Ground Cover.”

Page 406 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 3
Fire Stations 56
Renovation

29. ASTM E1155, “Standard Test Method for Determining Floor Flatness and FL Floor Levelness Numbers”

30. ASTM D2240, “Standard Test Method for Rubber Property-Durometer Hardness.” E. Concrete Reinforcing Steel Institute (CRSI),

1. CRSI "Manual of Standard Practice.”

1.3 SUBMITTALS
A. Submittal Procedures: Procedures for submittals.

1. Review of submittals will cover general design only. In no case shall submittal review relieve the Contractor of the responsibility for strength of concrete, general or detailed dimension, quality or quantity of materials, or any other conditions, functions, performance or guarantees required.

2. Product Data:
a. Manufacturers' literature containing product and installation specifications and details.
b. Where Manufacturer's specifications, recommendations, and/or directions are required in this specification, deliver to the Engineer two (2) copies of such printed specifications, recommendations, and/or directions for approval before any work is commenced.
c. Sources of fine and coarse aggregate. Once approved, the source of fine and coarse aggregate shall not be changed without written approval of the Engineer. d. List of manufacturers and brand names for cement, mineral and liquid admixtures, bond breakers, curing compounds, joint sealants, and materials other than aggregates and reinforcing steel. Include product data sheets, instructions, and specifications for use.

3. Batch Plant Equipment and Procedures
a. Supplier of concrete and ready-mix grout. Only one source will be approved for the Contractor, including all subcontractors. All concrete and ready-mixed grout supplied to the project shall originate from the approved single facility. b. The following information shall be submitted:
1) Name of supplier.
2) Plant location.
3) Plant volume and output capacity.
4) Capacity of transit equipment.
5) Estimated travel time from plant to jobsite.
c. If the Contractor elects to use an on-site concrete batching plant, the following information shall be submitted:
1) Drawings and data including proposed location of the batch plant on the site. 2) List of and performance data for material handling equipment. 3) Procedures for processing, handling, transporting, sorting, and proportioning the materials for concrete.
d. All other data necessary to show the supplier’s capability to produce concrete of the quality and quantity required.

4. Concrete Procedures
a. The following information shall be submitted:
1) Placement drawings for slab-on-grade shall be submitted indicating location and size, placement sequence, joint locations, and embedded items. 2) Procedure for mixing and transporting concrete to the point of placement. 3) Procedures for placement of concrete.
4) Methods of obtaining and maintaining the required concrete temperature during placement and initial curing.
5) Procedures for consolidating the concrete.
6) Procedures how concrete is finished and cured (slab-on-grade concrete).

Page 407 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 4
Fire Stations 56
Renovation

5. Assurance/Control Submittals:
a. Test Reports: Submit the following reports directly to the Engineer from Testing Laboratory, with copy to Contractor. Prepare reports in conformance with Section 01 40 00 - Quality Requirements.
b. Submit laboratory test reports for concrete materials and mix design test, including certified copy of results of aggregate tested by ASTM C1260 or C1567. Mix designs for each strength and type of concrete proposed for use. Details to be included are found in section 2.7.
c. Certificates: Manufacturer's certificate that Products meet or exceed specified requirements.
d. Qualification Documentation: Submit documentation of experience indicating compliance with specified qualification requirements.

6. Delivery Tickets:
a. Copies of delivery tickets for each load of concrete delivered to site. b. Indicate on each ticket information required by ASTM C94 including additional information required herein.
c. Mix identification number on ticket shall match number on submitted and approved mix design
d. Indicate number of drum revolution from when water is added until concrete is discharged.
e. Submit copies to Testing Laboratory same day as concrete delivery.

7. Verification Samples:
a. At exposed concrete location provide a sample of concrete with medium broom finish and sealed for Engineer’s approval.

B. Closeout Procedures and Training: Procedures for closeout submittals.

1. Project Record Documents: Accurately record the following:
a. Shop drawings shall be corrected to reflect actual field changes and become part of the "Record As-Built Drawings".

1.4 DELIVERY, STORAGE, AND HANDLING
A. Division 1 - Product Requirements: Transport, handle, store, and protect Products.

B. Deliver materials in unopened containers with labels identifying contents.

C. Store powdered materials in dry area and in a manner to prevent damage. Protect liquid materials from freezing or exceeding maximum storage temperatures set by product manufacturer.

1.5 PROJECT CONDITIONS OR SITE CONDITIONS
A. Jobsite Requirements:

1. Conform to ACI 305 R when placing concrete during hot weather.

2. Conform to ACI 306 R when placing concrete during cold weather.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Subject to compliance with project requirements, manufacturers offering Products which may be incorporated in the Work include the following:

Page 408 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 5
Fire Stations 56
Renovation

1. Applied Concrete Technology, Inc.,

2. The Euclid Chemical Company,

3. Fortifiber Corporation,

4. ChemRex Inc.,

5. W.R. Meadows, Inc.,

6. Reef Industries,

7. Stego Industries LLC,.

8. L & M Construction Chemicals, Inc.

9. Curecrete Chemical Company, Inc.

10. Midwest Floor Care Inc.,

11. General Resource Technology, Inc.,

12. Or approved equal

2.2 CONCRETE MATERIALS
A. Concrete:

1. Concrete shall be in accordance with ASTM C94. If a conflict exists between ASTM C94 and these specifications, these specifications shall govern.

B. Portland Cement: ASTM C150 – Type II unless otherwise specified or approved by the Engineer.

1. Assume full responsibility for the quality and soundness of cement. Cement is to be of one type and from the same mill; it is to be of uniform color for all concrete with permanently exposed concrete finishes.

C. Liquid admixtures: All admixtures shall be used in conformance with the manufacturer’s recommendations. When air entraining admixtures, water reducing admixtures, high range water reducing admixtures, and non-corrosive accelerating admixtures are used in any combination, all products shall be from the same manufacturer or the ready-mix concrete producer shall certify that they are compatible. The following admixtures are permitted when approved in writing prior to use or are required as specified herein and shall be used in strict accordance with the manufacturer's specifications or recommendations:

1. Calcium chloride: Conform to ACI 301. The water-soluble chloride ion level shall not exceed 0.3 percent by weight of cement.

2. Air-entraining admixtures: ASTM C260 shall be used to achieve the specified air content in all permanently exposed exterior concrete. For steel hard trowel interior slab finish, do not use air entrainment admixtures. The total air entrainment (entrained and entrapped air) must not exceed 3 percent. For steel trowel exterior slab finish, comply with ACI 318 and ACI 302.
a. Euclid: AEA-92 or Air Mix 200.
b. BASF: Micro-Air, MBVR-Standard, and MB AE 90.
c. Sika: Sika AEA-14, Sika AEA-15, and Sika Air.
d. W.R. Grace: Darex EH, Darex II AEA, Daravair AT60, Daravair 1400, and Daravair 1000.
e. Or approved equal.

3. Water-reducing admixtures: Conform to ASTM C494, Type A, containing not more chloride ions than allowed in paragraph C., above.
a. Euclid: Eucon WR series or Eucon MR.
b. BASF: Masterpave, Masterpave N, PolyHeed 997, Pozzolith 220N, and Glenium 7500.
c. W.R. Grace: Daracem 55 and Daracem 65, WRDA 82 and WRDA with HYCOL. d. Sika: Sikament HP, Plastocrete 161, and Sikament 686. e. General Resource Technology: Polychem 400 NC and Polychem 1000. f. Or approved equal.

Page 409 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 6
Fire Stations 56
Renovation

4. Water-reducing/accelerating admixtures: Conform to ASTM C494, Type C or E having long-term test results showing non-rusting on metal deck and reinforcing steel. a. Euclid: Accelguard series.
b. BASF: Pozzutec 20+, Pozzolith NC 534, and Rheocrete CNI. c. Sika: Sika Rapid-1 and Plasocrete 161FL.
d. W.R. Grace: Lubricon NCA, Polarset, and DCI.
e. Or approved equal.

5. Water-reducing/retarding admixtures: Conform to ASTM C494, Type D containing not more than 1 percent chloride ions.
a. Euclid: Eucon Retarder series.
b. BASF: Delvo Stabilizer, Masterpave series, and Pozzolith 100XR, 200N, 220N and 322N.
c. Sika: Plastimet.
d. W.R. Grace: Daratard 17, WRDA-64, and WRDA-82.
e. Or approved equal.

6. High-range/water-reducing (HRWR) admixtures: Conform to ASTM C494, Type F or G super plasticizers containing 1 percent maximum chloride ions may be used with low slump (3 inches maximum) concrete to produce flowable concrete (up to 8 inches slump) with early strength gain and 28-day strengths equal to reference concrete. HRWR admixture may be used providing not more than 60 minutes is allowed from addition of admixture to final placement of concrete. HRWR admixture shall be used in concrete with a maximum water/ cement ratio of 0.50 or less and is suggested in the following:
a. In pumped concrete.
b. In concrete topping slabs
c. In lieu of the specified water-reducing admixture (Type A) where confinement of placing due to heavy reinforcement or narrow space requires flowable concrete. d. Where more than 30 minutes is required between the addition of admixtures to final placement of the concrete, a combination of water-reducing, set controlling admixtures (ASTM C494, Types A, D, & E) as in Master Builders Company "Synergized Performance System" may be used.
1) Euclid: Eucon 37 or Eucon 537.
2) BASF: Rheobuild 1000, Glenium 3000 NS, and Glenium 3400NV. 3) Sika: Sikament 300, Viscocrete 2100, and Sikament 686. 4) W.R. Grace: Daracem 100, ADVA Cast 530, Mira 92, and ADVA Cast 575. 5) Or approved equal.

D. Fly ash: Conform to ASTM C618. The use of a quality fly ash will be permitted as a cement- reducing admixture (minimum 15 percent and maximum 25 percent). Fly ash used in concrete shall be from a single source and of a single class in combination with Portland cement of a single source and single class unless otherwise approved by the Engineer. The fly ash shall meet all of the requirements of ASTM C618, Class C or Class F, with the following special requirements:

The loss on ignition in Table 1 shall not exceed 3 percent. Compliance to Table 1A shall apply.

The amount retained on the 325 sieve in Table 2 shall not exceed 34 percent. Where a Type II low-alkali cement is specified, the total C 3A shall be less than 8 percent of total cementitious material. The chemical analysis of the fly ash shall be reported in accordance with ASTM C311.

Quality assurance testing and reports for a minimum of six months shall be submitted by the fly ash supplier. The option to use fly ash must be approved prior to use.

E. Granulated Blast Furnace Slag is an alternative to fly ash and shall conform to ASTM C989 Grade 100 0r 120. Granulated blast furnace slag may be used as a substitute for a maximum of 30 percent of Portland cement.

F. Certification: Certification of the above requirements is required from the admixture manufacturer prior to mix design review and approval by the Engineer. Upon request by the Engineer, a

Page 410 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 7
Fire Stations 56
Renovation
qualified representative is to be provided to assure proper use of admixtures. Use of admixtures, other than listed above will be permitted only when approved by the Engineer.

G. Aggregates:

1. Normal-weight concrete - ASTM C33. For slabs, also conform to combined aggregate grading recommendations of ACI 302 and ACI 302.1R, unless otherwise permitted by the Engineer.

2. All concrete exposed to the weather shall conform to the limits of deleterious substances and physical properties of Table 3, ASTM C 33.

3. Local aggregates: Local aggregates not complying with ASTM C33 but which have been shown by special test or actual service to produce concrete of adequate strength and durability may be used when acceptable to the Engineer.

4. The nominal size of an aggregate particle shall not exceed:
a. 20 percent of the narrowest dimension between sides of forms. b. 33 percent of the depth of slabs.
c. 75 percent of the dimension between reinforcing bars. d. 75 percent of the dimension between reinforcing bars and forms.

5. Maximum size of coarse aggregates and minimum cementitious contents: ACI 301 and ACI 302.1R.

6. Concrete aggregate alkali-silica reactivity (ASR) shall be tested in accordance with ASTM C1260 with a 14-day expansion (no supplementary cementing materials) or ASTM C1567 (with supplementary cementing materials) of less than 0.1 percent. Materials (cement, supplementary cementing materials, and aggregates) to be used in the concrete shall be tested. Coarse aggregates and fine aggregates shall be individually tested. If two grades of coarse aggregates are blended, they shall be individually tested.

7. Abrasive aggregates non-slip finishes: Fused aluminum oxide grits, or crushed emery, as abrasive for non-slip finish with emery aggregate containing not less that 40 percent aluminum oxide and not less than 25 percent ferric oxide. Use material that is factory- graded, packaged, rustproof, non- glazing, and unaffected by freezing, moisture, and cleaning materials.

H. Water:

1. Clean, potable, and free of injurious amounts of oil, acid, alkali, organic or other deleterious matter not detrimental to concrete; drinkable.

2. Water shall contain no more than 650 parts per million of chlorides as Cl or more than 1000 parts per million of sulfates as SO 4. In no case shall the water contain an amount of impurities that will cause a change in the setting time of Portland cement of neither more than 25 percent nor a reduction in compressive strength of mortar at 14 days of more than 5 percent when compared to the results obtained with distilled water when tested in accordance with ASTM C109.

3. Water used for curing shall not contain impurities in amounts to cause discoloration of the concrete or mortar or to produce etching of the surface.

4. Recycled water shall conform to ASTM C94.

2.3 CURING/SEALING/HARDENERS
A. Dissipating liquid membrane-forming compounds for curing concrete; Conform to ASTM C309, Type 1. Curing compound shall be compatible with floor sealer or finish used. Low VOC.

1. Euclid: VOX Kurex DR VOX series; waterborne products.

2. W.R. Meadows: 1100-Clear series.

3. Edoco: Burke Aqua Resin Cure.

4. L&M Construction Chemicals: Cure R.

5. BASF: Kure 200W

6. Or approved equal.

Page 411 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 8
Fire Stations 56
Renovation
B. Method of curing shall be approved by the finish flooring applicator where finishes are indicated.

C. Liquid Densifier/Sealer/Hardener: to be applied on exposed concrete floors cured with dissipating membrane forming curing compound to harden and densify concrete surfaces. Sealers are to be clear, chemically reactive, a waterborne solution of silicate or siliconate materials and proprietary components, odorless, and colorless.

1. ChemMasters: Chemisil Plus

2. Conspec Marketing and Manufacturing Co., Inc. Intraseal

3. Euclid Chemical Company: Euco Diamond Hard (Liquid Sealer and Hardener)

4. L&M Construction Chemicals: Seal Hard (Liquid Sealer and Hardener)

5. Curecrete Chemical Company: Ashford Formula (Liquid Sealer and Hardener)

6. W.R. Meadows, Inc.: Liqui-Hard

7. Sika: Sikafloor 3S

8. Sonneborn: Kure-N-Harden

9. Symons Corporation: Buff Hard

10. Or approved equal.

2.4 JOINTS AND EMBEDDED ITEMS:

A. Construction and Contraction Joints: Comply with ACI 301 and recommendations of ACI 302.1R.

Sealant shall be two-part semi- rigid epoxy, and shall have minimum Shore A Hardness of 80 when measured with ASTM D2240.

B. Isolation Joints: Fillers shall consist of 1/8-inch width strips of neoprene, synthetic rubber, or approved substitute, extending the full depth of the slab. Sealant shall be two-part elastomeric type, polyurethane base.

2.5 VAPOR BARRIER/RETARDER
A. Provide cover over prepared soil, above aggregate subbase material at slabs-on-grade, where shown on the plans. Use only materials which are resistant to decay when coated in accordance with ASTM E154.

1. Vapor Retarder: Polyethylene sheet not less than 10 mils thick, or

2. Vapor Barrier:
a. Stego: Stego Wrap Vapor Barrier 10 –mil
b. Fortifiber: Moistop and Moistop Ultra 10.
c. Insulation Solution Viper Vaporcheck 10.
d. Or approved equal

3. Vapor Barrier:
a. Stego: Stego Wrap Vapor Barrier 15 –mil
b. Fortifiber: Moistop and Moistop Ultra 15.
c. W.R. Grace: Florprufe 120.
d. Insulation Solution Viper Vaporcheck 16
e. Or approved equal

2.6 PROPORTIONING
A. Prepare design mixes for each type and strength of concrete by either laboratory trial batch or field experience methods as specified in ACI 301. If laboratory trial batch method is used, use an independent testing facility acceptable to the Engineer for preparing and reporting proposed mix designs.

Page 412 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 9
Fire Stations 56
Renovation
B. Concrete types and strengths: Minimum 28 Day Compressive Strength shall be as shown on drawings.

When the concrete mix design is developed from laboratory trial batching, adjust proportions to produce a design mix at least 1200 psi greater than the specified strength.

When the field experience method is used, the required average compressive strength shall be determined in accordance with ACI 318. Documentation that proposed concrete proportions will produce an average compressive strength equal to or greater than the required average compressive strength shall consist of a field strength test record representing materials and proportions to be used for this project. A field strength test record shall consist of at least 10 consecutive tests encompassing a period of time of not less than 45 days and made within the past 12 months.

Also, see general and specific notes on structural drawings.

C. Weights: All concrete shall be normal-weight concrete unless otherwise designated on the structural drawings.

D. Aggregate gradation: For slabs, also conform to combined aggregate grading recommendations of ACI 302.1R, unless otherwise permitted. For all other concrete not otherwise noted the coarse aggregate gradation shall conform to ASTM C33 size no. 57 or larger.

E. Durability: Conform to ACI 301.

1. All concrete exposed to potentially destructive weathering, such as freezing and thawing, or to de-icer chemicals is to be air-entrained, 6 percent +1percent, a minimum six sacks cementitious per cubic yard of concrete, 0.45 maximum water-cementitious ratio, and, 4- inch maximum slump.

2. Water-cement ratio: For concrete subject to freezing and thawing or deicer chemicals, the water-cement ratio shall not exceed 0.53 by weight including any water added to meet specified slump in accordance with the requirements of ASTM C94 unless otherwise noted.

F. Slump: Conform to ACI 301.

1. As indicated in drawings.

G. Slab-On-Grade

1. Concrete shall conform to ACI 302.1R.

2. The minimum cementitious content shall be in accordance with ACI 302.1R Table 6.2.

3. The maximum water-cementitious ratio shall be as shown on drawings

4. The maximum water content shall not be greater than 250 lbs per cubic yard of concrete.

5. The air content shall be less than 3 percent.

H. Production of concrete: Conform to ACI 301:

1. Cast-in-place concrete used in the work shall be produced at a single off-site batching plant or may be produced at an on-site batch plant.

2. All concrete shall be proportioned conforming to the approved mix designs and of the materials contained in those approved mixes. A certified copy of the design weights for each mix shall be kept at the producing plant for each class of concrete used on the project.

3. Plant equipment and facilities are to conform to the "Check List for Certification of Ready- Mixed Concrete Production Facilities" of the National Ready-Mixed Concrete Association (NRMCA) and have NRMCA or approved certification within the past year.

4. Coarse aggregates shall be washed and, if necessary, shall be uniformly moistened just before batching. Each size of coarse aggregate shall be batched from separate bins as required to produce the combined grading requirements.

5. Prior to adding a high-range water reducer (super plasticizer), slump shall not exceed the working limit. The high-range water reducing admixture shall be accurately measured and

Page 413 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 10
Fire Stations 56
Renovation
pressure-injected into the mixer as a single dose. If added at the jobsite, the field dispensing system shall conform to the same requirements as a plant system and tested prior to each day’s operation. After the addition of the high-range water reducer, the concrete shall be mixed at mixing speed for a minimum of 5 minutes.

6. Ready-mixed and on-site batched concrete shall be batched, mixed, and transported in accordance with ASTM C94.
a. Truck mixers and their operation shall ensure that the discharged concrete is uniformly within acceptable limits of consistency, mix, and grading. All mechanical details of the mixer, such as water-measuring and discharge apparatus, conditions of the blades, speed of rotation, general mechanical condition of the unit, and clearance of the drum shall be checked before the use of the unit will be permitted. b. Truck mixers shall be equipped with approved revolution counters by which the number of revolutions of the drum or blades may readily be verified. The water tank system of the truck shall be equipped with gauges that permit accurate determination of the tank contents.
c. Each batch of concrete shall be mixed in a truck mixer for not less than 80 revolutions of the drum or blades and at the rate of rotation designated as mixing speed by the manufacturer of the equipment. Additional mixing, if any, shall be at the speed designated as the agitating speed by the manufacturer of the equipment.

All materials, including mixing water but excluding any high-range water reducers added onsite, shall be in the mixer drum before actuating the revolution counter for determining the number of revolutions of mixing.
d. The concrete producer shall furnish duplicate delivery tickets, one for the Contractor and one given to the City’s Representative for each batch of concrete. The information provided on the delivery ticket shall include the quantity of materials batched including the amount of free water in the aggregate and any water added onsite. Show the date, time of day batched, and if ready-mixed the time of discharge from the truck. The quantity of water that can be added at the site without exceeding the maximum water-cementitious ratio specified shall be noted on the delivery ticket.

7. Concrete produced by on-site volumetric batching and continuous mixing if approved shall conform to ASTM C685.

8. For concrete produced on site with a central batch plant, mixing shall be done in an approved batch mixer.
a. The Contractor shall maintain and operate the on-site batch plant and transportation equipment in a manner that will produce the results specified in this section. b. The Engineer reserves the right to reject the proposed on-site plant if, in his/her opinion, the on-site plant will interfere with other operations or impair the quality of the concrete.
c. The quantities of cement, pozzolanic materials, and aggregates used in each batch shall be determined by automatic weighing. The quantity of water shall be determined by weighing or volumetric measurement.
d. The weighing equipment for aggregates shall be readily adjustable both to compensate for variation in moisture content of the aggregates and for changing mix proportions. Moisture-sensing devices shall automatically compensate the aggregate weights for changes in moisture content. The charging of weigh hoppers directly from aggregate handling equipment such as front-end loaders will not be permitted.
e. Mixers in centralized batching and mixing plants shall be arranged so that mixing actions can be observed from a location convenient to the mixing-plant operator’s station.
f. Equipment shall be provided that discharges pozzolanic material into the cement hopper only after the addition of the Portland cement. Pozzolanic materials shall be stored in such a manner as to permit ready access for the purpose of inspection and sampling and be suitably protected against contamination of moisture. Should any

Page 414 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 11
Fire Stations 56
Renovation
pozzolan show evidence of contamination or be otherwise unsuitable, the Engineer will reject it and require that it be removed from the site. g. Dispensers for admixtures shall have the capacity of the full quantity of the properly diluted solution required for each batch. They shall be maintained in a clean and freely operating condition. Admixtures shall be added to the premeasured water for the batch or shall be discharged into the batch by flowing automatically and uniformly into the stream of mixing water from the beginning to end of its flow into the mixer.

Equipment for measurement shall give visual confirmation of the accuracy of the measurement for each batch.
h. The central batch mixer shall be rotated at a speed recommended by the manufacturer and mixing shall be continued for a minimum of 1-1/2 minutes after all materials are in the drum.
i. Each stationary mixer shall be equipped with a mechanically operated timing and signaling device that will indicate and ensure the completion of the required mixing period and will count the batches.
j. All concrete shall be mixed until there is a uniform distribution of the materials and shall be discharged completely before the mixer is recharged.

9. The Engineer may increase the mixing time when the charging and mixing operations fail to produce a delivered batch in which variations of consistency, mix, or grading are within the limits specified.

10. Variations in consistency during the discharge of a single batch shall not exceed 1 inch of slump, except that a greater variation will be permitted if the slump of the concrete decreases and no water is added. Variations in mix and in grading of different parts of the delivered batch shall be within limits stated in ASTM C94.

11. Water shall be introduced prior to, during, and following mixer-charging operations.

12. When a mixer produces unsatisfactory results, it shall be repaired promptly and effectively, or it shall be replaced.

13. Mixers shall not be loaded in excess of their rated capacity.

14. Overmixing, such as to require addition of water to preserve the required consistency or to reduce slump, will not be permitted.

15. All other concrete: Conform to ACI 301

16. Use of accelerating admixtures in cold weather and retarding admixtures in hot weather shall not relax placement requirements specified herein.

17. All concrete placed at ambient temperatures below 50 degrees F is to contain an approved accelerator. The concrete temperature when delivered at the site shall be at least 50 degrees F.

18. All concrete placed at ambient temperatures above 80 degrees F is to contain an approved retarder.

19. All concrete required to be air-entrained is to contain an approved air-entraining admixture.

20. When improved workability, pumpability, lower water-cement ratio, or high ultimate and/or early strength is required, the HRWR admixture (super plasticizer) may be used.

21. Ensure air content for slabs with steel trowel finish is less than 3.0 percent.

22. The concrete shall be of such consistency and composition that it can be worked readily into the corners and angles of the forms and around reinforcement without permitting materials to segregate or free water to collect on the surfaces. Within the limiting requirements, adjust the consistency of the concrete as may be necessary to produce mixtures which will be placeable with reasonable methods of placing and compacting.

Maintain on the job at all times adequate extra cement to be used at rate of 1/2 sack cement per cubic yard concrete for each 2" slump increase for corrections due to wetness desired or obtained. No water shall be added to concrete except with the approval of the City inspector.

23. No water shall be added to concrete except with the approval of the City inspector. The water-cementitious ratio stated on the approved mix designs shall not be exceeded unless approved by the Engineer. Re-tempered concrete shall be mixed for not less than 80 revolutions of the drum or blades and at the rate of rotation designated as mixing speed by the manufacturer of the equipment.

Page 415 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 12
Fire Stations 56
Renovation

24. Adjustments to concrete mixes: Mix design adjustments may be requested by Contractor when characteristics of materials, job conditions, weather, test results, or other circumstances warrant at no additional cost to City. Laboratory test data for revised mix design and strength results must be submitted and accepted before using in work.

2.7 REINFORCING MATERIALS
A. Section 03 20 00: Concrete Reinforcement
PART 3 - EXECUTION

3.1 EXAMINATION
A. Division 1 - Execution: Verification of existing conditions before starting work.

B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.

C. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected and approved by the Engineer.

D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.

3.2 INSTALLATION - GENERAL
A. Install all cast-in-place concrete work in accordance with ACI 301 except as herein specified.

B. All bearing materials shall be inspected by the Engineer prior to placing concrete. The Engineer shall be the sole judge as to the suitability of the bearing material.

C. Compact stone base aggregate to thickness indicated on drawings. Proof roll stone screenings topping to provide smooth hard surface on which to place slab. Surface should not show footprints or truck tracks when driven over.

D. Immediately before placing concrete, spaces to be occupied by concrete shall be free from standing water, ice, mud, and debris.

E. Concrete shall not be deposited under water or where water in motion may injure the surface finish of the concrete.

F. Immediately before placing concrete for exterior sidewalk, curb and gutter, pavements, and slab- on-grade, subbases and compacted subgrades shall be thoroughly moistened, but not muddied, by sprinkling with water. Surfaces shall be kept moist by frequent sprinkling, as required, up to the time of placing of concrete.

G. Place and properly support reinforcing steel and anchor bolts.

Page 416 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 13
Fire Stations 56
Renovation

3.3 REINFORCEMENT
A. Placement: Section 03 20 00 - Concrete Reinforcement

3.4 METHODS OF PLACEMENT AND PLACING CONCRETE
A. Placement: Conform to ACI 301:

1. Maintain concrete cover around reinforcing as per Section 3.3 above and ACI 301.

2. The methods and equipment used for transporting concrete to the site work and the time that elapses during transportation shall not cause segregation of coarse aggregate or slump loss in excess of 1 inch when measured at the point of discharge.

3. Concrete shall be placed within 90 minutes after the water has been added to the cement and aggregates. Concrete shall be placed prior to initial concrete set.

B. Depositing Concrete

1. Deposit concrete as near its final position as possible to avoid segregation due to rehandling or flowing. Hoppers, tremies, pump line, ducts, chutes, or other methods approved by the Engineer shall be used to deposit concrete in its final position within the specified time limits and without segregation of the mix.

2. The sequence of concrete placement and the number, type, position, and design of joints shall be approved by the Engineer prior to concrete placement.

3. Place floor slabs-on-grade by "strip cast" method.

C. Conveyor Belts and Chutes

1. Chutes or conveyor belts shall not be used except as approved by the Engineer.

2. Concrete shall be conveyed from the mixer to the place of final deposit by methods that will prevent separation and loss of material.

3. Chutes longer than 50 feet and conveyor belts longer than 110 feet will not be permitted.

D. Pumping of Concrete

1. The type and operation of a concrete pump shall be subject to the approval of the Engineer.

The equipment used in placing the concrete and the method of its operation shall introduce the concrete into the forms without high velocity.

E. Joints

1. Joints shall be vertical in walls and horizontal in slabs.

2. Dowel bars and tie bars shall be inspected

3. Control joints for controlling concrete shrinkage shall be provided in floor slabs, walls, decks, conduits, and channels as shown on the plans or approved by the Engineer.

4. Joint spacing and sawcut depth for slab-on-grade shall be as follows:
a. Sawed control (contraction) joints for pavements and slab-on-grade shall be installed as soon as practical so as not to ravel the concrete but less than 12 hours. b. The minimum sawcut joint depth shall be 1/4 of the slab thickness unless an early- entry SOFF-CUT saw is used in accordance with manufacturer recommendations (typically sawed between 1 to 4 hours after finishing to a 1-inch minimum depth. c. Joint spacing shall in feet shall not exceed 2-1/2 times the slab thickness in inches unless otherwise approved by the Engineer.
d. The long dimension of a slab shall not exceed 1.5 times the short dimension unless otherwise approved by the Engineer.

5. If there is a delay in casting but prior to concrete initial set, the concrete placed after the delay shall be thoroughly spaded and consolidated at the edge of that previously placed to avoid cold joints. Concrete shall then be brought to correct level and struck off with a straight edge. Bullfoats shall be used to smooth slab surfaces, leaving it free of humps or hollows.

Page 417 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 14
Fire Stations 56
Renovation

6. Where placing concrete is interrupted long enough for the concrete to take its initial set, the working face shall be made a construction joint.
a. Preparation and disposition of unplanned cold joints in walls shall be approved by the Engineer.
b. For slab-on-grade, pavements, sidewalk, and curb and gutter, concrete shall be removed back to the nearest planned joint and a construction joint installed.

7. Unless otherwise noted on the drawings, where concrete is to be placed against existing concrete, except in the case of expansion joints, the joint face of the existing concrete shall be roughened.
a. Before new concrete is placed against hardened concrete, the bonding surface of the existing concrete shall be roughened to an amplitude of 0.25 inch using bush hammers, abrasive blasting, or high-pressure water blasting. b. Fresh concrete may be green-cut with water blasting and hand tools to remove concrete laitance and spillage and to expose sound aggregate. c. The prepared surfaces of hardened concrete shall be kept thoroughly wet during the 24-hour period immediately prior to the placement of the new concrete. Wetting shall be accomplished by continuous sprinkling or by covering exposed surfaces with wet burlap.
d. Where shown on the drawings or permitted by the Engineer, bond-preventing compound shall be applied by brush in accordance with the manufacturer’s printed instructions.

F. Consolidation

1. Concrete for slabs 8 inches thick or less may be consolidated with vibrating screeds. Slabs between 8 to 12 inches thick shall be compacted with internal vibrators and (optionally) with vibrating screeds.

2. Concrete shall be consolidated by vibration to the maximum practicable density. The concrete shall be free from pockets of coarse aggregate and entrapped air.

3. Consolidation shall be carried on continuously with the placing of concrete.

G. Repair of surface defects: ACI 301.

1. Inspect concrete surfaces and surfaces to be painted immediately upon removal of forms Irregularities shall be immediately rubbed or ground to secure a smooth, uniform, and continuous surface.

2. Clean surfaces of tie holes. Tie holes shall be filled solid with patching mortar.

3. Surfaces to be smoothed shall not be plastered or coated.

4. Patch imperfections as needed or as directed by the Engineer. Repairs in accordance with Section 3.8 shall not be made until the surface has been inspected and repair methods have been approved by the Engineer.

3.5 FINISHING
A. Slabs: Minimum slab surface tolerance must satisfy ACI 301 and ACI 302.1R as measured in accordance with ASTM E1155.

1. Slabs-on-grade:
a. For exposed slabs, install semi-rigid epoxy sealant in construction and contraction joints after slab has a minimum of 60 days or otherwise approved by the Engineer. b. Separate slabs-on-grade from vertical surfaces with 1/2-inch-thick joint filler. Extend joint filler from bottom of slab to within 1/8 inch of finished slab surface. c. Allowable tolerance for slab on grade surfaces, measured in accordance with ACI 117 and ASTM E1155, shall meet or exceed an overall value of FF35/Fl25, with minimum local value of FF24/FL17.

2. Concrete Finishes:
a. The following will not be permitted on slab or floor finishes:
1) Dusting dry cement or sand on the surface to absorb excess moisture.

Page 418 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 15
Fire Stations 56
Renovation
2) Use of a mortar finishing coat.
3) Excessive troweling or manipulation that brings water or a large number of fines to the surface.
4) Use of a Fresno.
5) Addition of water to the surface during the finishing operation. 6) Use of the floor during construction in a manner that leads to marring or staining the finish.
b. Surface preparation
1) The concrete shall be brought up evenly to slightly above finished grade and shall be thoroughly compacted and consolidated. The top shall be struck off to accurately established grade strips or grade blocks. Complete screeding before any excess moisture or bleedwater is present on the surface. 2) After bull floating, defer additional finishing operations until the concrete has stiffened sufficiently to sustain foot traffic pressure with an indentation of not more than ¼ inch.
c. Floor Slabs: Steel trowel finish unless otherwise noted on the plans. The finish surface shall match that of the adjacent existing concrete. As soon as the moisture sheen has disappeared from the floated surface and the concrete has hardened sufficiently to prevent drawing moisture and fine materials to the surface, the surface shall be steel troweled to produce a smooth, hard, uniform finish. Final steel troweling shall be conducted after the concrete is hard enough that no mortar accumulates on the trowel when manipulated with heavy pressure. Machine finishing may be used for troweling.
d. Exposed concrete slabs shall be sealed or sealed and hardened using a liquid compound compatible with the curing method used as described in: 3.7 Curing, Protection, Liquid Hardeners and Sealers of this Section.

3.6 CURING, PROTECTION, LIQUID HARDENERS AND SEALERS
A. Curing Compound

1. All curing methods shall be placed immediately after final finishing (i.e., within two hours).

Contractor's attention is directed to the fact that experience shows the most important time of curing is from three to four hours after placing and extending five to six hours thereafter.

It is extremely important, therefore, to prevent loss of moisture, particularly during this period when concrete is especially vulnerable to plastic shrinkage cracks. All exposed surfaces of concrete including floor slabs, whether or not they receive a finish flooring, shall be protected from premature drying for a minimum of seven days.

2. Apply the specified curing compound in strict accordance with manufacturer’s written instructions. Curing compound shall not be diluted by the addition of solvents or thinners, nor shall it be altered in any other manner. Curing compound that has become chilled and is too viscous for satisfactory application shall be heated by steam or hot water bath until it has proper fluidity. The temperature of the compound shall not exceed 100 ºF. Curing compound shall not be heated by direct exposure of the container to fire.

3. When used on an unformed concrete surface, application of the first coat of curing compound shall commence immediately after finishing operations have been completed.

When curing compound is used on a formed concrete surface, the surface shall first be moistened with a fine spray of water immediately after the forms have been removed. The spray shall be continued until the surface does not readily absorb further water. As soon as the surface film of water has disappeared and the surface is almost dry, the first coat of curing compound shall be applied. In the event that application is delayed on either formed or unformed surfaces, the surface shall be kept continuously moist until the compound has been applied or the specified period of water curing has elapsed.

4. Surfaces shall be sprayed uniformly with 2 coats of curing compound. Each coat shall provide a minimum coverage of 1 gallon per 250 square feet of surface. As soon as the first coat has become dry, a second coat shall be applied in the same manner. The direction

Page 419 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 16
Fire Stations 56
Renovation
of application of the second coat shall be perpendicular to the first coat. The curing compound shall be sprayed using approved pneumatic or pump driven equipment having the following characteristics:
a. Separate lines to the nozzle for material and for compressed air b. A filtering system for the removal or entrapment of contaminants c. A constant application pressure

5. Curing compound shall not be used on any concrete surface specified to receive additional concrete, coatings, grout, and chemical treatment
B. Protection

1. The contractor shall allow no traffic and take precautions to avoid damage to the membrane of the curing compound for a period of not less than 28 days. Damage shall be repaired immediately to the satisfaction of the Engineer.

2. Special care shall be taken to prevent avoid damaging the surfaces and joints due to load stresses from construction equipment, heavy shock, and excessive vibration. During construction activities, concrete shall be protected against damage with plywood or other approved materials until final acceptance by the Engineer.

C. All floor slabs shall be cured using products and methods compatible with selected floor adhesives, toppings, and other finish materials.

D. Sealing Coat: Uniformly apply a continuous sealing coat of curing and sealing compound to hardened concrete by power spray or roller according to manufacturer’s written instruction.

3.7 PATCHING AND REPAIR
A. Concrete will be considered by the Engineer as not conforming to the intent of the drawings and specifications for the following reasons:

1. Concrete is not formed as shown on the drawings.

2. Concrete is not in true alignment or level.

3. Concrete which exhibits a defective surface.

4. Concrete with defects that reduce the structural integrity of a member or members.

5. Concrete jointed slabs with uncontrolled random cracking.

B. Non-conforming concrete to required thickness, lines, details, and elevations will be rejected by the Engineer and shall be modified or replaced with concrete that conforms to the contract requirements without a claim by the Contractor for additional cost or extension of contract time.

C. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of City Engineer for each individual area. Should the City Engineer grant permission for the Contractor to attempt restoration of a defective area by patching or other repair methods, such permission shall not be considered a waiver of the Engineer’s right to require complete removal of the defective area if, in the Engineer’s opinion, the restoration does not provide the structural or aesthetic integrity of the member or members.

D. All repairs of defective areas shall conform to ACI 301. On areas requiring treatment of defects and until such repairs have been completed, only water cure will be permitted E. At any time prior to final acceptance, concrete found to be defective, damaged, or not in accordance with the specifications shall be repaired or removed and replaced with acceptable concrete.

3.8 ACCEPTANCE OF STRUCTURE
A. Comply with ACI 301 and modifications in this section.

B. Completed concrete work, which meets all applicable requirements, will be accepted without qualification.

Page 420 of 805 ends

SECTION 03 3000

CAST-IN-PLACE CONCRETE
City of Montebello 03 3000 - 17
Fire Stations 56
Renovation
C. Completed concrete work which fails to meet one or more requirements but which has been repaired to bring it into compliance will be accepted without qualification.

D. Completed concrete work which fails to meet one or more requirements and which cannot be brought into compliance may be accepted or rejected by the City Engineer. In this event, modifications may be required to assure that remaining work complies with the requirements.

E. The costs of any additional tests or analysis, including additional architectural and engineering services, performed to prove the adequacy of the concrete work, shall be borne by the Contractor without extension of contract time.

END OF SECTION

Page 421 of 805 ends

SECTION 03 3543

BONDED ABRASIVE POLISHED CONCRETE FLOORS
City of Montebello 01 7300 - 1
Fire Stations 56
Renovation
PART 1 – GENERAL

1.1 SUMMARY
A. Section Includes: Products and procedures for bonded abrasive polished concrete floors using multi-step wet/dry mechanical process, and accessories indicated, specified, or required to complete polishing.

1.2 DEFINITIONS
A. Terminology: As defined by Concrete Polishing Council (CPC) glossary.

B. Polished Concrete: The act of changing a concrete floor surface, with or without surface exposure of aggregate, to achieve a specified level of appearance.

C. Bonded Abrasive Polished Concrete: The multi-step operation of mechanically grinding, honing, and polishing a concrete floor surface with bonded abrasives to cut a concrete floor surface and to refine each cut to the maximum potential to achieve a specified level of appearance as defined by the CPC.

1.3 SUBMITTALS
A. Product Data: Manufacturer’s technical literature for each product indicated, specified, or required.

Include manufacturer's technical data, application instructions, and recommendations.

B. Installer Qualifications: Data for company, principal personnel, experience, and training specified in PART 1 “Quality Assurance” Article.

C. Maintenance Data: For inclusion in maintenance manual required by Division 01.

1. Include instructions for maintenance of installed work, including methods and frequency recommended for maintaining optimum condition under anticipated use.

2. Include precautions against cleaning products and methods which may be detrimental to finishes and performance.

1.4 QUALITY ASSURANCE
A. Polisher Qualifications:

1. Experience: Company that has successfully completed five projects similar in design, products, and extent to scope of this Project; with a record of successful in-service performance; and with sufficient production capability, facilities, and personnel to produce specified work.

2. Supervision: Maintain a competent supervisor who is at Project during times specified work is in progress, and is currently certified as Craftsman - Level I or higher by CPAA, CPC Craftsman, or equivalent.

3. Manufacturer Qualification: Approved by manufacturer to apply liquid

Page 422 of 805 ends

SECTION 03 3543

BONDED ABRASIVE POLISHED CONCRETE FLOORS
City of Montebello 01 7300 - 2
Fire Stations 56
Renovation
applied products.

B. Field Mock-up/Sample: Before performing work of this Section, provide following field mock- up/sample to verify selections made under submittals and to demonstrate aesthetic effects of polishing. Approval does not constitute approval of deviations from Contract Documents, unless Architect specifically approves deviations in writing.

1. Form, reinforce, and cast concrete slab for 10-foot square field mock-up.

2. Mock-up shall be representative of work to be expected.

3. Perform grinding, honing, and polishing work as scheduled for Project using same personnel as will perform work for Project.

4. Approval is for following aesthetic qualities:
a. Compliance with approved submittals.
b. Compliance with specified aggregate exposure class.
c. Compliance with specified appearance level.
d. Compliance with specified color.

5. Obtain Architect’s approval before starting work on Project.

6. Protect and maintain approved field mock-ups during construction in an undisturbed condition as a standard for judging completed work.

7. Upon completion of mock-up; owner to review and approve desired outcome and sign off.

Mock-up to be used as a reference throughout the polishing phases of the project.

C. Pre-Installation of Concrete Conference: Prior to placing concrete for areas scheduled for polishing, conduct conference at Project to comply with requirements of applicable Division 01 Sections.

1. Required Attendees:
a. Owner.
b. Architect.
c. Contractor, including supervisor.
d. Concrete producer.
e. Concrete finisher, including supervisor.
f. Concrete polisher, including supervisor.
g. Technical representative of liquid applied product manufacturers.

2. Minimum Agenda: Polisher shall demonstrate understanding of work required by reviewing and discussing procedures for, but not limited to, following:
a. Tour field mock-up and representative areas of required work, discuss and evaluate for compliance with Contract Documents, including substrate conditions, surface preparations, sequence of procedures, and other preparatory work performed by other installers.
b. Review Contract Document requirements.
c. Review approved submittals and field mock-up.
d. Protection of concrete substrate during construction and prior to polishing process.
e. Project phasing and scheduling for each step of grinding, honing and polishing operations including, but not limited to:

Page 423 of 805 ends

SECTION 03 3543

BONDED ABRASIVE POLISHED CONCRETE FLOORS
City of Montebello 01 7300 - 3
Fire Stations 56
Renovation
i. Quality of qualified personnel committed to project. ii. Quality and size of grinders committed to project.
iii. Proper disposal of concrete slurry and/or concrete dust. f. Details of each step of grinding, honing, and polishing operations. i. Application of color.
ii. Application of liquid applied products.
iii. Protecting polished concrete floors after polishing work is complete.

3. Reports: Record discussions, including decisions and agreements reached, and furnish copy of record to each party attending.

1.5 FIELD CONDITIONS
A. Damage and Stain Prevention: It is the responsibility of others to prevent damage and staining of concrete surfaces to be polished.

1. Prohibit use of markers, spray paint, and soapstone.

2. Prohibit improper application of liquid membrane film forming curing compounds.

3. Prohibit vehicle parking over concrete surfaces.

4. Prohibit pipe-cutting operations over concrete surfaces.

5. Prohibit storage of any items over concrete surfaces for not less than 28 days after concrete placement.

6. Prohibit ferrous metals storage over concrete surfaces.

7. Protect from petroleum, oil, hydraulic fluid, or other liquid dripping from equipment working over concrete surfaces.

8. Protect from acids and acidic detergents contacting concrete surfaces.

9. Protect from painting activities over concrete surfaces.

B. Environmental Limitations: Comply with manufacturer's written instructions for substrate temperature, ambient temperature, moisture, ventilation, and other conditions affecting liquid applied product application.

PART 2 – PRODUCTS

2.1 LIQUID APPLIED PRODUCTS
A. Liquid Densifier: An aqueous solution of silicon dioxide dissolved in one of the following hydroxides that penetrates into the concrete surface and reacts with the calcium hydroxide to provide a permanent chemical reaction that hardens and densifies the wear surface of the cementitious portion of the concrete.

1. Sodium Silicate

2. Potassium Silicate

3. Lithium Silicate

4. Alkali solution of Colloidal Silicates or Silica
B. Dye: Non-film forming soluble colorant dissolved in a carrier designed to penetrate and alter

Page 424 of 805 ends

SECTION 03 3543

BONDED ABRASIVE POLISHED CONCRETE FLOORS
City of Montebello 01 7300 - 4
Fire Stations 56
Renovation
coloration of a concrete floor surface without a chemical reaction.

C. Pigmented Micro Stains: Fine pigment particles suspended in water- based silicate solution that penetrates concrete and reacts with calcium hydroxide to lock in color particles.

D. Acid Stain: Reactive solution of one or more metal salts stabilized by acid that produces coloration in a concrete substrate by neutralization of acid followed by precipitation of metal hydroxides or oxides.

2.2 ACCESSORIES
A. Repair Material: A product that is designed to repair cracks and surface imperfections. The specified material must have sufficient bonding capabilities to adhere after the polishing to the concrete surface and provide abrasion resistance equal to or greater than the surrounding concrete substrate.

B. Material: Acceptable products shall be: Clear Epoxy

2.3 POLISHING EQUIPMENT
A. Field Grinding and Polishing Equipment:

1. A multiple head, counter rotating, walk behind or ride on machine, of various size and weights, with diamond tooling affixed to the head for the purpose of grinding concrete.

Excludes janitorial maintenance equipment.

2. If dry grinding, honing, or polishing, use dust extraction equipment with flow rate suitable for dust generated, with squeegee attachments to meet OSHA requirements.

3. If wet grinding, honing, or polishing, use slurry extraction equipment suitable for slurry removal and containment prior to proper disposal.

B. Edge Grinding and Polishing Equipment: Hand-held or walk-behind machines which produces the same results, without noticeable differences, as field grinding and polishing equipment.

C. Burnishing Equipment: High speed walk-behind or ride-on machines capable of generating 1000 to 2000 revolutions per minute and with sufficient head pressure of not less than 20 pounds to raise floor temperature by 20 degrees F.

D. Diamond Tooling: Abrasive tools that contain industrial grade diamonds within a bonded matrix (such as metallic, resinous, ceramic, etc.) that are attached to rotating heads to refine the concrete substrate.

1. Bonded Abrasive: Abrasive medium that is held within a bonding that erodes away to expose new abrasive medium as it is used.

2. Metal Bond Tooling: Diamond tooling that contains industrial grade diamonds with a metallic bonded matrix that is attached to rotating heads to refine the concrete substrate. These tools are available in levels of soft, medium, and hard metallic matrices that are matched with contrasting concrete substrates

Page 425 of 805 ends

SECTION 03 3543

BONDED ABRASIVE POLISHED CONCRETE FLOORS
City of Montebello 01 7300 - 5
Fire Stations 56
Renovation
(i.e. hard matrix/soft concrete, medium matrix/medium concrete, soft matrix/hard concrete) and are typically used in the grinding
and early honing stages of the polishing process.

3. Resin Bond Tooling: Diamond tooling that contains industrial grade diamonds within a resinous bonded matrix (poly-phenolic, ester-phenolic, and thermoplastic-phenolic) that is attached to rotating heads to refine the concrete substrate. Resin bond tooling does not have the soft/medium/hard characteristics of metal bond tooling and are typically used for the later honing and polishing stages of the polishing process
.

4. Hybrid Tooling: Diamond tooling that combines metal bond and resin bond that has the characteristics of both types of tooling. These types of tools are typically used as either transitional tooling from metal bond tools to resin bond tools or as a first cut tool on smooth concrete surfaces.

5. Transitional Tooling: Diamond tooling that is used to refine the scratch pattern of metal bond tooling prior to the application of resin bond tooling in an effort to extend the life of resin bond tooling and to create a better foundation for the polishing process.

6. Abrasive Pad: An abrasive pad, resembling a typical floor maintenance burnishing pad that has the capability of refining the concrete surface on a microscopic level that may or may not contain industrial grade diamonds.

These pads are typically used for the maintenance and/or restoration of previously installed polished concrete flooring.

PART 3 – EXECUTION

3.1 EXAMINATION
A. Acceptance of Surfaces and Conditions:

1. Examine substrates to be polished for compliance with requirements and other conditions affecting performance.
a. Concrete finished floor flatness according to applicable B. Proceed only when unsatisfactory conditions have been corrected in a manner complying with Contract Documents.

C. Starting work within a particular area will be construed as acceptance of surface conditions.

3.2 PREPARATION
A. Cleaning New Concrete Surfaces:

1. Prepare and clean concrete surfaces.

2. Provide sound concrete surfaces free of laitance, glaze, efflorescence, curing compounds, form-release agents, dust, dirt, grease, oil, paint splatter, and other contaminants incompatible with liquid applied products and polishing.

Page 426 of 805 ends

SECTION 03 3543

BONDED ABRASIVE POLISHED CONCRETE FLOORS
City of Montebello 01 7300 - 6
Fire Stations 56
Renovation

3.4 COLORING CONCRETE FLOORS
A. Dye or Pigmented Micro Stain Application:

1. Follow manufacturer’s recommendation.

3.5 POLISHING CONCRETE FLOORS
A. Perform all polishing procedures to ensure a consistent visual appearance from wall to wall.

B. Initial Grinding:

1. Use grinding equipment with metal or semi-metal bonded tooling.

2. Begin grinding in one direction using sufficient size equipment and diamond tooling to meet specified aggregate exposure class.

3. Make sequential passes with each pass perpendicular to previous pass using finer grit tool with each pass, up to 100 grit metal bonded tooling.

4. Achieve maximum refinement with each pass before proceeding to finer grit tools.

5. Clean floor thoroughly after each pass using dust extraction equipment properly fitted with squeegee attachment or walk behind auto scrubber suitable to remove all visible loose debris and dust.

6. Continue grinding until aggregate surface exposure matches approved field mock-up.

C. Treating Surface Imperfections:

1. Fill surface imperfections including, but not limited to, holes, surface damage, small and micro cracks, air holes, pop-outs, and voids with clear epoxy to eliminate micro pitting in finished work.

2. Work compound and treatment until color differences between concrete surface and filled surface imperfections, compared to mockup, are not reasonably noticeable when viewed from 20 feet away under lighting conditions that will be present after construction.

D. Liquid Densifier Application: Apply undiluted to point of rejection, remove excess liquid, and allow curing according to manufacturer’s instructions.

E. Epoxy Grinding:

1. Use grinding equipment and appropriate grit and bond diamond tooling.

2. Apply clear epoxy, into cracks of the concrete slab to fill surface imperfections.

3. Clean floor thoroughly after each pass using dust extraction equipment properly fitted with squeegee attachment or walk behind auto scrubber suitable to remove all visible loose debris and dust.

F. Honing:

1. Use grinding equipment with hybrid or resin bonded tooling.

2. Hone concrete in one direction starting with 100 grit tooling and make as many sequential passes as required to remove scratches, each pass perpendicular to previous pass, up to 400 grit tooling reaching maximum refinement with each pass before proceeding to finer grit tooling.

3. Clean floor thoroughly after each pass using dust extraction equipment properly fitted with squeegee attachment or walk behind auto scrubber suitable to remove all visible loose

Page 427 of 805 ends

SECTION 03 3543

BONDED ABRASIVE POLISHED CONCRETE FLOORS
City of Montebello 01 7300 - 7
Fire Stations 56
Renovation
debris and dust.

G. Polishing:

1. Use polishing equipment with resin-bonded tooling.

2. Begin polishing in one direction starting with 800 grit tooling.

3. Make sequential passes with each pass perpendicular to previous pass using finer grit tooling with each pass until the specified level of appearance has been achieved.

4. Achieve maximum refinement with each pass before proceeding to finer grit pads.

5. Clean floor thoroughly after each pass using dust extraction equipment properly fitted with squeegee attachment or walk behind auto scrubber suitable to remove all visible loose debris and dust.

6. Stain Protection: Uniformly apply and remove excessive liquid according to manufacturer’s
instructions. Final film thickness should be less than .05 mils after cure.

7. Final Polish: Using burnishing equipment and finest grit abrasive pads, burnish to uniform reflective sheen matching approved field mock-up.

H. Final Polished Concrete Floor Finish:

1. Aggregate Exposure Class B – Fine Aggregate: Surface exposure of 85 to 95% fine aggregate and 5 to 15% cement fines and coarse aggregate based on visual observation of the overall area of the polished floor.

2. Appearance Level 3 – Polished:
a. Procedure: Recommended not less than 4 steps with full refinement of each diamond tool with one application of densifier.
b. Measurement: Determine the Image Clarity Value, %, and the Haze Index:
1) Image Clarity Value, %: An average value of 40 to 69 measured in accordance with ASTM D5767 prior to the application of sealers.
2) Haze Index: An average value less than 10 measured in accordance with ASTM D4039 prior to the application of sealers.
3) The minimum number of tests distributed across the polished surface should be three, for areas up to 1000 ft2 and one additional test for each 1000 ft2 or fraction thereof. This applies to both the Image Clarity Value and Haze Index.

3.6 PROTECTION

A. Protection is the responsibility of others.

END OF SECTION

Page 428 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Framing with dimension lumber.

2. Framing with timber.

3. Framing with engineered wood products.

4. Shear wall panels.

5. Wood blocking and nailers.

6. Wood furring.

B. Related Requirements:

1. Section 06 1600 "Sheathing" for sheathing, subflooring, and underlayment.

1.3 DEFINITIONS
A. Boards or Strips: Lumber of less than 2 inches nominal (38 mm actual) size in least dimension.

B. Dimension Lumber: Lumber of 2 inches nominal (38 mm actual) size or greater but less than 5 inches nominal (114 mm actual) size in least dimension.

C. Timber: Lumber of 5 inches nominal (114 mm actual) size or greater in least dimension.

1.4 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details.

B. Include data for wood-preservative treatment from chemical treatment manufacturers and certification by treating plant that treated materials comply with

Page 429 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 2
Fire Stations 56
Renovation
requirements. Indicate type of preservative used and net amount of preservative retained.

C. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements.

Include physical properties of treated materials based on testing by a qualified independent testing agency.

D. For fire-retardant treatments, include physical properties of treated lumber both before and after exposure to elevated temperatures, based on testing by a qualified independent testing agency according to ASTM D 5664.

E. For products receiving a waterborne treatment, include a statement that moisture content of treated materials was reduced to levels specified before shipment to Project site.

1.5 INFORMATIONAL SUBMITTALS
A. Material Certificates: For dimension lumber specified to comply with minimum allowable unit stresses. Indicate species and grade selected for each use and design values approved by the ALSC Board of Review.

B. Evaluation Reports: For the following, from ICC-ES:

1. Wood-preservative-treated wood.

2. Fire-retardant-treated wood.

3. Engineered wood products.

4. Shear panels.

5. Power-driven fasteners.

6. Post-installed anchors.

7. Metal framing anchors.

1.6 QUALITY ASSURANCE
A. Testing Agency Qualifications: For testing agency providing classification marking for fire-retardant treated material, an inspection agency acceptable to authorities having jurisdiction that periodically performs inspections to verify that the material bearing the classification marking is representative of the material tested.

1.7 DELIVERY, STORAGE, AND HANDLING
A. Stack wood products flat with spacers beneath and between each bundle to provide air circulation. Protect wood products from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.

Page 430 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 3
Fire Stations 56
Renovation
PART 2 - PRODUCTS

2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Grade lumber by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.

B. Factory mark each piece of lumber with grade stamp of grading agency.

C. Dress lumber, S4S, unless otherwise indicated.

D. Maximum Moisture Content of Lumber: 15 percent for 2-inch nominal (38-mm actual) thickness or less; 19 percent for more than 2-inch nominal (38-mm actual) thickness otherwise indicated.

E. Engineered Wood Products: Acceptable to authorities having jurisdiction and for which current model code research or evaluation reports exist that show compliance with building code in effect for Project.

F. Allowable design stresses, as published by manufacturer, shall meet or exceed those indicated. Manufacturer's published values shall be determined from empirical data or by rational engineering analysis and demonstrated by comprehensive testing performed by a qualified independent testing agency.

2.2 WOOD-PRESERVATIVE-TREATED LUMBER
A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC2 for interior construction not in contact with ground, Use Category UC3b for exterior construction not in contact with ground, and Use Category UC4a for items in contact with ground.

B. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium.

C. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use material that is warped or that does not comply with requirements for untreated material.

D. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.

E. Application: Treat all rough carpentry unless otherwise indicated.

F. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.

G. Wood sills, sleepers, blocking, furring, and similar concealed members in contact with masonry or concrete.

H. Wood floor plates that are installed over concrete slabs-on-grade.

Page 431 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 4
Fire Stations 56
Renovation

2.3 FIRE-RETARDANT-TREATED MATERIALS
A. General: Where fire-retardant-treated materials are indicated, materials shall comply with requirements in this article, that are acceptable to authorities having jurisdiction, and with fire-test-response characteristics specified as determined by testing identical products per test method indicated by a qualified testing agency.

B. Fire-Retardant-Treated Lumber and Plywood by Pressure Process: Products with a flame-spread index of 25 or less when tested according to ASTM E 84, and with no evidence of significant progressive combustion when the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5 feet (3.2 m) beyond the centerline of the burners at any time during the test.

C. Treatment shall not promote corrosion of metal fasteners.

D. Exterior Type: Treated materials shall comply with requirements specified above for fire-retardant-treated lumber and plywood by pressure process after being subjected to accelerated weathering according to ASTM D 2898. Use for exterior locations and where indicated.

E. Interior Type A: Treated materials shall have a moisture content of 28 percent or less when tested according to ASTM D 3201 at 92 percent relative humidity. Use where exterior type is not indicated.

F. Design Value Adjustment Factors: Treated lumber shall be tested according to ASTM D 5664 and design value adjustment factors shall be calculated according to ASTM D 6841.

G. Kiln-dry lumber after treatment to maximum moisture content of 19 percent.

H. Identify fire-retardant-treated wood with appropriate classification marking of qualified testing agency.

I. For exposed items indicated to receive a stained or natural finish, chemical formulations shall not bleed through, contain colorants, or otherwise adversely affect finishes.

J. Application: Treat items indicated on Drawings, and the following:

1. Framing for non-load-bearing partitions.

2. Roof construction.

2.4 DIMENSION LUMBER FRAMING
A. Non-Load-Bearing Interior Partitions: As indicated on Drawings.

B. Load-Bearing Partitions: As indicated on Drawings.

C. Joists, Rafters, and Other Framing Not Listed Above: As indicated on Drawings.

D. Exposed Framing: As indicated on Drawings.

E. Species and Grade: As indicated on Drawings.

Page 432 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 5
Fire Stations 56
Renovation

2.5 TIMBER FRAMING
A. Comply with the following requirements, according to grading rules of grading agency indicated:

B. Species and Grade: Douglas fir-larch, Douglas fir-larch (north), or Douglas fir-south; No. 1 grade; NLGA, WCLIB, or WWPA.

C. Maximum Moisture Content: 19 percent.

D. Additional Restriction: Free of heart centers.

2.6 ENGINEERED WOOD PRODUCTS
A. Source Limitations: Obtain each type of engineered wood product from a single source from a single manufacturer.

B. Rim Boards: Product designed to be used as a load-bearing member and to brace wood I-joists at bearing ends, complying with research or evaluation report for I- joists.

C. Material: Product made from any combination of solid lumber, wood strands, and veneers.

D. Thickness: 1-1/4 inches (32 mm), unless indicated on Structural Drawings.

E. Comply with APA PRR-401, rim board grade. Factory mark rim boards with APA- EWS trademark indicating thickness, grade, and compliance with APA-EWS standard.

2.7 SHEAR WALL PANELS
A. Wood-Framed Shear Wall Panels: Prefabricated assembly consisting of wood perimeter framing, tie downs, and Exposure I, Structural I plywood or OSB sheathing.

2.8 MISCELLANEOUS LUMBER
A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:

1. Blocking.

2. Nailers.

3. Furring.

B. Dimension Lumber Items: Standard, Stud, or No. 3 grade lumber of any of the following species:

1. Western woods; WCLIB or WWPA.

Page 433 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 6
Fire Stations 56
Renovation
C. For blocking not used for attachment of other construction, Utility, Stud, or No. 3 grade lumber of any species may be used provided that it is cut and selected to eliminate defects that will interfere with its attachment and purpose.

D. For blocking and nailers used for attachment of other construction, select and cut lumber to eliminate knots and other defects that will interfere with attachment of other work.

E. For furring strips for installing plywood or hardboard paneling, select boards with no knots capable of producing bent-over nails and damage to paneling.

2.9 FASTENERS
A. General: Fasteners shall be of size and type indicated and shall comply with requirements specified in this article for material and manufacture.

B. Where rough carpentry is exposed to weather, in ground contact, pressure- preservative treated, or in area of high relative humidity, provide fasteners with hot- dip zinc coating complying with ASTM A 153/A 153M.

C. Nails, Brads, and Staples: ASTM F 1667.

D. Power-Driven Fasteners: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC70.

E. Post-Installed Anchors: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on appropriate ICC-ES for the substrate.

2.10 METAL FRAMING ANCHORS
A. Allowable design loads, as published by manufacturer, shall meet or exceed those of products of manufacturers listed. Manufacturer's published values shall be determined from empirical data or by rational engineering analysis and demonstrated by comprehensive testing performed by a qualified independent testing agency. Framing anchors shall be punched for fasteners adequate to withstand same loads as framing anchors.

1. Joist Hangers: As indicated on Structural Drawings.

2. Top Flange Hangers: As indicated on Structural Drawings.

3. Post Bases: As indicated on Structural Drawings.

4. Joist Ties: As indicated on Structural Drawings.

5. Hold-Downs: As indicated on Structural Drawings.

2.11 INSTALLATION, GENERAL
A. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.

Page 434 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 7
Fire Stations 56
Renovation
B. Framing with Engineered Wood Products: Install engineered wood products to comply with manufacturer's written instructions.

C. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry accurately to other construction. Locate furring, nailers, blocking, and similar supports to comply with requirements for attaching other construction.

D. Install plywood backing panels by fastening to studs; coordinate locations with utilities requiring backing panels. Install fire-retardant-treated plywood backing panels with classification marking of testing agency exposed to view.

E. Install shear wall panels to comply with manufacturer's written instructions.

F. Install metal framing anchors to comply with manufacturer's written instructions.

Install fasteners through each fastener hole.

G. Install sill sealer gasket to form a continuous seal between sill plates and foundation walls.

H. Do not splice structural members between supports unless otherwise indicated.

I. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim.

J. Provide metal clips for fastening gypsum board or lath at corners and intersections where framing or blocking does not provide a surface for fastening edges of panels.

Space clips not more than 16 inches (406 mm) o.c.

K. Provide fire blocking in furred spaces, stud spaces, and other concealed cavities as indicated and as follows:

L. Fire block furred spaces of walls, at each floor level, at ceiling, and at not more than 96 inches (2438 mm) o.c. with solid wood blocking or noncombustible materials accurately fitted to close furred spaces.

M. Fire block concealed spaces of wood-framed walls and partitions at each floor level, at ceiling line of top story, and at not more than 96 inches (2438 mm) o.c. Where fire blocking is not inherent in framing system used, provide closely fitted solid wood blocks of same width as framing members and 2-inch nominal (38-mm actual) thickness.

N. Sort and select lumber so that natural characteristics do not interfere with installation or with fastening other materials to lumber. Do not use materials with defects that interfere with function of member or pieces that are too small to use with minimum number of joints or optimum joint arrangement.

O. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative- treated lumber.

P. Use inorganic boron for items that are continuously protected from liquid water.

Q. Use copper naphthenate for items not continuously protected from liquid water.

R. Where wood-preservative-treated lumber is installed adjacent to metal decking, install continuous flexible flashing separator between wood and metal decking.

Page 435 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 8
Fire Stations 56
Renovation
S. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:

T. Table 2304.9.1, "Fastening Schedule," in ICC's International Building Code (IBC).

U. Table R602.3(1), "Fastener Schedule for Structural Members," and Table R602.3(2), "Alternate Attachments," in ICC's International Residential Code for One- and Two- Family Dwellings.

V. ICC-ES evaluation report for fastener.

W. Use steel common nails unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood. Drive nails snug but do not countersink nail heads unless otherwise indicated.

X. Use common nails unless otherwise indicated. Drive nails snug but do not countersink nail heads.

2.12 WOOD BLOCKING, AND NAILER INSTALLATION
A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.

B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces unless otherwise indicated.

C. Provide permanent grounds of dressed, pressure-preservative-treated, key-beveled lumber not less than 1-1/2 inches (38 mm) wide and of thickness required to bring face of ground to exact thickness of finish material. Remove temporary grounds when no longer required.

2.13 WOOD FURRING INSTALLATION
A. Install level and plumb with closure strips at edges and openings. Shim with wood as required for tolerance of finish work.

B. Furring to Receive Plywood or Hardboard Paneling: Install 1-by-3-inch nominal- (19- by-63-mm actual-) size furring at 24 inches (610 mm) o.c. unless noted otherwise.

C. Furring to Receive Gypsum Board Install 1-by-2-inch nominal- (19-by-38-mm actual- ) size furring vertically at 16 inches (406 mm) o.c. unless noted otherwise.

2.14 WALL AND PARTITION FRAMING INSTALLATION
A. General: Provide single bottom plate and double top plates using members of 2-inch nominal (38-mm actual) thickness whose widths equal that of studs, except single top plate may be used for non-load-bearing partitions. Fasten plates to supporting construction unless otherwise indicated.

Page 436 of 805 ends

SECTION 06 1000

ROUGH CARPENTRY
City of Montebello 06 1000 - 9
Fire Stations 56
Renovation
B. For exterior walls see Structural Drawings.

C. For interior partitions and walls see Structural Drawings.

D. Construct corners and intersections as indicated on Structural Drawings.

E. Frame openings with multiple studs and headers, see Structural Drawings

2.15 CEILING JOIST AND RAFTER FRAMING INSTALLATION
A. Ceiling Joists: Install with crown edge up and complying with requirements specified above for floor joists. Face nail to ends of parallel rafters.

B. Rafters: Notch to fit exterior wall plates and use metal framing anchors. Double rafters to form headers and trimmers at openings in roof framing, if any, and support with metal hangers. Where rafters abut at ridge, place directly opposite each other and nail to ridge member or use metal ridge hangers.

2.16 TIMBER FRAMING INSTALLATION
A. Install timber beams with crown edge up and provide not less than 4 inches (102 mm) of bearing on supports. Provide continuous members unless otherwise indicated; tie together over supports as indicated if not continuous.

B. Install wood posts using metal anchors indicated on Structural Drawings.

C. Treat ends of timber beams and posts exposed to weather by dipping in water- repellent preservative for 15 minutes.

END OF SECTION

Page 437 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes the following:

1. Plastic-laminate cabinets.

2. Solid-surfacing-material countertops and splashes.

3. Shop finishing of interior woodwork.

4. Plastic-laminate paneling system.

B. Related Documents: The Contract Documents, as defined in Division 1 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other documents.

1.2 DEFINITIONS
Interior architectural woodwork includes wood furring, blocking, shims, and hanging strips for installing woodwork items unless concealed within other construction before woodwork installation.

1.3 REFERENCES
A. American Woodworking Institute (AWI)
B. Woodwork Institute of California (WIC)

1.4 QUALITY ASSURANCE
A. Perform work in accordance with WIC custom quality.

1.5 SUBMITTALS
A. Product Data: For panel products, high pressure decorative laminate, adhesive for bonding plastic laminate, solid surfacing material, cabinet hardware and accessories, and finishing materials and processes.

B. Shop Drawings: Show location of each item, dimensioned plans and elevations, large- scale details, attachment devices, and other components. Drawings shall show each type of cabinet, with sufficient details to clearly indicate al features of construction and attachment to structure. Drawings will include, as minimum, the following:

1. Show indication of material and grades.

2. Scaled plans or plan section of each item, showing location and layout of units with relation to surrounding walls, doors, windows and other building components, fully dimensioned.

3. Scaled elevations of each cabinet type, fully dimensioned.

Page 438 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 2
Fire Stations 56
Renovation

4. Scaled sections to clarify special conditions, and locations and details or anchorage.

5. Fixed dimensions, with provisions of insertion of field dimensions.

6. Show locations and sizes of furring, blocking, and hanging strips, including concealed blocking and reinforcement specified in other Sections.

7. Show locations and sizes of cutouts and holes for plumbing fixtures, faucets, soap dispensers and other items installed in architectural woodwork.

8. Coordinate with other work involved and show on Shop Drawings.

9. Reproduction of Contract Documents to be used as Shop Drawings is not acceptable.

10. Conform to WIC custom grade, WIC Certificate not required. Provide compliance label to first page of Shop Drawings.

11. Keying Schedule: Indicate keying system for cabinet and fixture locks.

C. Samples for Initial Selection:

1. Plastic Laminates.

2. PVC edge material.

3. Thermoset decorative panels.

4. Solid-surfacing materials.

D. Samples for Verifications

1. Plastic laminates, 8 by 10 inches, for each type, color, pattern, and surface finish, with 1 sample applied to core material and specified edge material applied to 1 edge.

2. Plastic Laminate Panel System, 8 by 10 inches, for each type, color, pattern, and surface finish, with edge banding on 1 edge.

3. Solid-surfacing materials, 6 inches square.

4. Exposed cabinet hardware and accessories, one unit for each type and finish.

1.6 DELIVERY, STORAGE, AND HANDLING
A. Do not deliver woodwork until painting and similar operations that could damage woodwork have been completed in installation areas. If woodwork must be stored in other than installation areas, store only in areas where environmental conditions comply with requirements specified in “Project Conditions” Article.

1. Cabinets: Cabinets shall be handled carefully and set or stores inside on a level floor. Care shall be taken to protect exposed finished portions from bumping, scratching, etc. Under no circumstances shall cabinets or countertops be used for “work benches” or convenient places to store other materials.

Page 439 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 3
Fire Stations 56
Renovation

2. Countertops: Countertops shall be stacked flat, at least four inches off the floor, with protective covering under the bottom unit, and covered on top to protect surfaces from scratching. Strips of wood or other suitable materials shall be placed between tops. Care shall be taken to prevent breakage. Under no circumstance’s hall countertops be stood or stacked on end against a wall where they can be broken damaged by falling.

B. Replacements: in the event of damage, immediately make all repairs and replacements necessary to the approval of the Owner’s Representative and at no additional cost to the City.

Locate concealed framing, blocking, and reinforcements that support woodwork by field measurements before being enclosed, and indicate measurements on Shop Drawings.

1.7 COORDINATION
A. Coordinate sizes and locations of framing, blocking, furring, reinforcements and other related units of Work specified in other Sections to ensure that interior architectural woodwork ban be supported and installed as indicated.

B. Plumbing Fixture Coordination: Coordinate Shop Drawings and fabrication of countertops with sinks and lavatories specified in Division 22- “Plumbing.” PART 2- PRODUCTS

2.1 MATERIALS
A. General: Provide materials that comply with requirements of WI’s quality standard for each type of woodwork and quality grade specified, unless otherwise indicated.

B. Wood Products: Comply with the following:

1. Softwood Plywood: DOC PS 1, Medium Density Overlay.

C. High-Pressure Decorative Laminate: NEMA LD 3, grades as indicated or, if not indicated, as required by woodwork quality standard.

1. Manufacturer: Subject to compliance with requirements, provide high-pressure decorative laminates by one of the following:
a. Formica Corporation.
b. Lamin-Art, Inc.
c. Nevamar Company, LLC; Decorative Products Div.
d. Wilsonart International; Div. of Premark International, Inc. e. Or Approved Equal.

D. Countertops: Solid Surface, Stone.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Page 440 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 4
Fire Stations 56
Renovation
a. Caesarstone.
b. Q Premium Natural Quartz.
c. Or Approved Equal
E. Edge Bands:
3mm PVC banding at exposed edges and 1 mm PVC banding at semi-exposed edge ad case body to be machine applied with waterproof hot melt adhesive.

2.2 CABINET HARDWARE AND ACCESSORIES
A. General: Provide cabinet heavy duty hardware and accessory materials associated with architectural cabinets.

B. Frameless Concealed Hinges: BHMA A156.9, B01602, 107 degrees of opening (90-95 degrees at corners), self-closing and having passed 100,000 cycle tests.

1. Equal to: Blum Modul Hinge series with 170-degree opening.

2. Hinge shall have a lifetime warranty as offered by the hinge manufacturer.

3. Hinges shall be heavy duty wrap-around offset for overlay doors with non- removable pin.

4. Hinge shall not be clip type.

5. Hinges shall be securely anchored to the cabinet and door. Do not screw hinges into holes drilled for adjustable shelf brackets.

6. Number of hinges per door shall be as follows:
a. Door height 0”-36”: 2 hinges per door
b. Doors greater than 36” high and locker doors: Provide heavy duty piano type or continuous hinges.

C. Provide 4 types of heavy-duty sample of pulls for casework for architect approval.

D. Catches: Magnetic catches, BHMA A156.9, C03141.

E. Adjustable Shelf Standards and Supports: BHMA A156.9, B04071; with self-rests, B04081.

F. Shelf Rests: BHMA A156.9, B04013; metal, two-pin type with self-hold-down clip.

G. Drawer Slides heavy duty type: BHA A156.9, B05091, side-mounted; full-extension type, zinc-plated steel ball bearing slides, equal to Accuride #7432, and rated for the following loads:

1. File Drawer Slides: Grade 1HD-200 (200 lbf); for all drawers.

H. Grommets for Cable Passage through Countertops: 2-inch OD, molded-plastic grommets and matching plastic caps with slot for wire passage.

Page 441 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 5
Fire Stations 56
Renovation

1. Product: Subject to compliance with requirements, provide “SG series” by Doug Mockett & Company, Inc.

2. Color: As selected by Architect from manufacturer’s full range.

I. Exposed Hardware Finishes: For exposed hardware, provide finish that complies with BHMA A156.18 for BHMA finish number indicated.

Satin Chromium Plated: BHMA 626 for brass or bronze base; CHMA 652 for steel base.

J. For concealed hardware, provide manufacturer’s standard finish that complies with product class requirements in BHMA A156.9.

K. Bumpers: Provide rubber bumpers on inside corners of al doors to prevent laminate to laminate contact.

L. Lock Keying: Cabinet lock to be coordinated with Owner for various tiers of security.

2.3 MISELLANEOUS MATERIALS
A. Furring, Blocking, Shims and Hanging Strips: Softwood or hardwood lumber, kiln dried to less than 15 percent moisture content.

B. Anchors: Select material, type, size, and finish required for each substrate for secure anchorage. Provide nonferrous-metal or hot-dip galvanized anchors and inserts on inside face of exterior walls and elsewhere as required for corrosion resistance. Provide toothed-steel or lead expansion sleeves for drilled-in-place anchors.

C. Adhesives, General: Do not use adhesives that contain urea formaldehyde.

D. VOC Limits for Installation Adhesives and Glues: Use installation adhesives that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):

1. Wood Glues: 30g/L.

2. Contact Adhesive: 250 g/L.

E. Adhesive for Bonding Plastic Laminate: Unpigmented contact cement or Contact cement.

Adhesive for Bonding Edges: Hot-melt adhesive or adhesive specified above for faces.

2.4 FABRICATION, GENERAL
A. Interior Woodwork Grade: Unless otherwise indicated, provide Custom-grade interior woodwork complying with referenced quality standard.

B. Wood Moisture Content: Comply with requirements of referenced quality standard for wood moisture content in relation to ambient relative humidity during fabrication and in installation areas.

C. Fabricate woodwork to dimension, profiles and details indicated. Ease edge to radius indicated for the following:

Corners of Cabinets and Edges of Solid-Wood (Lumber) Members ¾ inch thick: 1/8 inch.

Page 442 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 6
Fire Stations 56
Renovation
D. Complete fabrication, including assembly, finishing and hardware application, to maximum extent possible before shipment to Project site. Disassemble components only as necessary for shipment and installation. Where necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting.

Trial fit assemblies at fabrication shop that cannot be shipped completely assembled.

Install dowels, screws, bolted connectors, and other fastening devices that can be removed after trial fitting. Verify that various parts fit as intended and check measurements of assemblies against field measurements indicated on Shop Drawings before disassembling for shipment.

E. Shop-cut opening to maximum extent possible to receive hardware, appliances, plumbing fixtures, electrical work, and similar items. Locate openings accurately and use templates or roughing-in diagrams to produce accurately sized and shaped openings.

Sand edges of cutouts to remove splinters and burrs.

Seal edges of openings in countertops with a coat of varnish.

2.5 PLASTIC-LAMINATE CABINETS
A. Grade: Custom.

B. WI Construction Style: Style A, Frameless.

C. WI Construction Type: Type I, multiple self-supporting units rigidly joined together.

D. WI Door and Drawer Front Style: Flush overlay.

E. Laminate Cladding for Exposed Surfaces: High-pressure decorative laminate complying with the following requirements:

1. Horizontal Surfaces Other Than Tops: Grade HGS.

2. Post formed Surfaces: Grade HGP.

3. Vertical Surfaces; Grade VGS.

4. Edges: PVC edge banding, 0.12-inch-thick, matching laminate in color, pattern, and finish.

F. Materials for Semi exposed Surfaces, including cabinet interior, interior door faces, and surface of shelving:

1. Surfaces Other Than Drawer Bodies: High-pressure decorative laminate, Grade VGS, or cabinet liner.
a. Edges of Plastic-laminate shelves: PVC T-mold matching laminate in color, pattern, and finish.
b. For semi exposed backs of panels with exposed plastic-laminate surfaces, provide surface of high-pressure decorative laminate, Grade VGS.

2. Drawer Sides and Backs: See Paragraph 2.4.I.(1).

Page 443 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 7
Fire Stations 56
Renovation

3. Drawer Bottoms: See Paragraph 2.4.I.(2).

G. Concealed Backs of Panels with Exposed Plastic Laminate Surfaces: High-pressure decorative laminate, Grade BKL.

H. Fabrication: Ends and Divisions: Cabinet ends and divisions shall be a minimum of

0.745” in thickness. The visible top edge of the ends of cabinets 6’-0” or more from the floor do not require an edge band but shall have al voids filled and sanded.

1. Joinery:
a. All cabinet members shall be securely fastened together. b. All joints shall be securely glued.
c. All exposed and semi-exposed joints shall be tight and true. d. To assemble cabinet bodies and components, the use of finish nails is allowed. They shall be a maximum of 4” on center (except face frames – 8” on center) with a minimum of two (2) fasteners per joint for cabinet body and drawer construction. Staples, screws and T nails are not permitted for exposed surfaces.
e. For custom and premium grades, at the option of the manufacturer, construction joinery shall be as follows.
1) Dadoes or Lock Joints: plows or rabbets.
2) Doweled Joints: The dowels shall be a minimum of 8mm x 30mm with a minimum of two (2) dowels per joint. The first dowel shall be spaced a maximum of 37mm from each edge or end, and the second dowel shall be a maximum of 32mm on center from the first dowel. Subsequent dowels shall be spaced a maximum of 128mm on center. Al dowel construction shall be glued and clamped.
3) Confirmat Type Screws: Maximum of 37mm from each end with subsequent screw being spaced 28mm on center. Glue is not required with this system.
4) Lamello Type Jointing Plates: The plates shall be a maximum of two (2) inches from each edge or end to the center of the plate.

Subsequent plates shall be spaced a maximum of six (6) inches on center. All joints shall be glued and clamped.
5) Mod-eez Type Fastening Systems: The fasteners shall be a maximum of 16” on center and 4” from any edge or end. They shall be fastened with 10 full thread sheet metal screws for cabinet body construction. Glue is not required with this system. 6) No exposed fastening is permitted, except for access panel. f. Vertical or horizontal divisions shall be dadoed or tenoned into adjoining members.

Page 444 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 8
Fire Stations 56
Renovation

2. Backs: Backs are required and shall be plywood, or tempered and sealed hardboard a minimum of ¼” in thickness. Color to match interior. Backs shall be securely nailed, stapled or dadoed to the case body and intermediate members.

Backs shall be rabbeted or dadoed into exposed ends unless a plant-on end is used.

Wood Anchor Strips: Suitable wood anchor strips are required and shall be a minimum of 1/2 “x 2-1/2” in thickness and provided at the top and bottom of the cabinet back.

3. Tops and Bottoms: Tops and bottoms shall be plywood with a minimum of ¾” in thickness.

4. Bases: Cabinet bases may be constructed with either separate or integral base.

Continuous top-set vinyl base with formed interior and exterior corners, or integral sheet vinyl base to match adjacent room base.

I. Drawers

1. Drawer Boxes: Construct subfront sides and back with ½” minimum 7 ply Baltic Birch plywood. All corner joints at sides to subfront and back shall be lock jointed, and glued together. Drawer sides, subfront and back shall be plowed to receive bottom, which shall be glued or glue blocked to form a rigid unit. Hardwood shall have a clear factory finish. Provide drawers with metal slides as specified.

2. Drawer bottoms shall be ¼” thick sound hardwood plywood with cabinet liner on the exposed interior face.

3. Drawer finish fronts shall be ¾” plywood with plastic laminate or wood veneer finish on exposed surface and cabinet liner on interior surface. Corners shall be eased and all four edges shall receive 3mm PVC edge with joint on bottom.

Secure finish front to drawer box subfront from the inside with #12 particle board screws, 1-1/2” from each side, bottom and top edge of front and 12” O.C. minimum horizontally for the full drawer width.

J. Doors: Cabinet doors shall be plywood core a minimum of 0.745” in thickness. The interior faces of cabinet doors including faces shelving shall be 0.030” minimum thickness high pressure thermoplastic cabinet liner. All four edges shall be banded with color to match exterior. Clear distance between doors shall be between 3/32” to 5/32”, width of a nickel. Overlay type, hinged to swing flat against the face of adjoining cabinet or the side of cabinet, with eased corners, and 3mm PVC with joint hidden under hinge. Do not notch door or cabinet ends, or divisions to receive hinge.

1. Provide edge bands per paragraph 2.1.E.

2. Provide door hinges per paragraph 2.2.B.

3. Provide door pulls per paragraph 2.2.C.

4. Provide metal strike plates at all cabinet door lock locations.

5. Provide catches per 2.2.D.

6. Provide bumpers per 2.2.K.

Page 445 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 9
Fire Stations 56
Renovation

7. Provide locks per 1.5.B.(11) and 2.2.L.

K. Cabinet Shelves: ¾” thick plywood core for spans up to 35 inches and 1” thick for spans over 35 inches and up to 48 inches, and adjustable to 1-inch centers. Comply with WIC Technical Bulletin adjustable shelf loading/deflection requirement. Do not recess metal shelf standards into the end panels; notch shelving to clear standards. Provide edge bands per Paragraph 2.1.E.

L. Finish for Toe Kick Base: Furnished and stalled under Section 09 65 00.

M. Visible Edges: All visible edges, exposed or semi-exposed, or ends, tops, bottoms, shelves, webs, stretchers, divisions or partitions, and top edges of drawer sides and backs, top of splash, shall be banded with one of materials listed in Paragraph 2.1.E.

Only the front edges of adjustable shelves are required to be banded.

N. Colors, Patterns, and Finishes: Provide materials and products that result in colors and textures of exposed laminate surfaces complying with the following requirements.

1. Match color, pattern and finish as indicated by manufacturer’s designations.

2. As selected by Architect from laminate manufacturer’s full range in the following categories:
a. Solid colors, matte finish.
b. Solid colors with core same color as surface, matte finish. c. Wood grains, matte finish.
d. Patterns, matte finish.

2.6 SOLID-SURFACING-MATERIAL COUNTERTOPS AND SPLASHES
A. Grade: Custom.

B. Solid-Surfacing-Material Thickness: ¾ inch.

C. Colors, Patters, and Finishes: Provide materials and products that result in colors of solid surfacing material complying with the following requirements:

1. Match color, pattern and finish as indicated by manufacturer’s designations.

2. As selected by Architect from manufacturer’s full range.

D. Fabricate tops in one piece, unless otherwise indicated. Comply with solid-surfacing- material manufacturer’s written recommendations for adhesives, sealers, fabrication, and finishing.

1. Fabricate tops with shop-applied edges of materials and configuration indicated.

2. Fabricate tops with loose backsplashes for field application.

E. Seal joint between countertop and splashes and between splashes and walls with sealant as specified in Division 07 “Joint Sealants.”

Page 446 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 10
Fire Stations 56
Renovation
F. Edge treatment: As indicated.

G. Drill holes in countertops for plumbing fittings and soap dispenses in shop.

2.7 SHOP FINISHING
A. Grade: Provide finishes of same grades as items to be finished.

B. General: Finish architectural woodwork at fabrication shop as specified in this Section.

Defer only final touchup, cleaning, and polishing until after installation.

C. Preparation for Finishing: Comply with referenced quality standard for sanding, filling countersunk fasteners, sealing concealed surfaces, and similar preparations for finishing architectural woodwork, as applicable to each unit of work.

Back priming: Apply one coat of sealer or primer, compatible with finish coats, to concealed surfaces of woodwork. Apply two coats to back of paneling and to end-grain surfaces. Concealed surfaces of plastic-laminate-clad woodwork do not require back priming when surfaced with plastic laminate, backing paper, or thermoset decorative panels.

PART 3 – EXECUTION

3.1 PREPARATION
A. Before Installation, condition woodwork to average prevailing humidity conditions installation areas.

B. Before installing architectural woodwork, examine shop-fabricated work for completion and complete work as required, including removal of packing and back priming.

3.2 INSTALLATION
A. GRADE: Install woodwork to comply with requirements for the same grade specified in Part 2 for fabrication of type of woodwork involved.

B. Assemble woodwork and complete fabrication at Project site comply with requirements for fabrication in Part 2, to extent that it was not completed in the shop.

C. Install woodwork level, plumb, true, and straight. Shim as required with concealed shims.

Install level and plumb (including tops) to a tolerance of 1/8 inch in 96 inches.

D. Scribe and cut woodwork to fit adjoining work, refinish cut surfaces, and repair damaged finish cuts.

E. Anchor woodwork to anchors or blocking built in or directly attached to substrates.

Secure with countersunk, concealed fasteners and blind nailing as required for complete installation. Use fine finishing nails or finishing screws for exposed fastening, countersunk and filled flush with woodwork and matching final finish if transparent finish is indicated.

F. Cabinets: Install without distortion so doors and drawers’ fit openings properly and are accurately aligned. Adjust hardware to center doors and drawers in openings and to provide unencumbered operation. Complete installation of hardware and accessory items as indicated.

Page 447 of 805 ends

SECTION 06 4000

INTERIOR ARCHITECTURAL WOODWORK
City of Montebello 06 4000 - 11
Fire Stations 56
Renovation

1. Install cabinets with no more than 1/8 inch in 96-inch sag, bow, or other variation from a straight line.

2. Fasten wall cabinets through back, near top and bottom, at ends and not more than 16 inches O.C. with No.10 wafer-head screw sized for 1-inch penetration into wood framing, blocking, or hanging strips.

G. Countertops: Anchor securely by screwing through corner blocks of base cabinets or other supports into underside of countertop.

1. Align adjacent solid-surfacing-material countertops and form seams to comply with manufacturer’s written recommendations using adhesive in color to match countertop. Carefully dress joints smooth, remove surface scratches, and clean entire surface.

2. Install countertops with no more than 1/8 inch in 96-inche sag, bow, or other variation from a straight line.

3. Secure backsplashes to tops with concealed metal brackets at 16 inches O.C. and to walls with adhesive.

4. Caulk space between backsplash and wall with sealant specified in Division 07 Section “Joint Sealants.”

3.3 CAULKING
All horizontal and vertical joints up 6” under sink cabinets shall be caulked with a silicone based caulking compound to provide protection in case of plumbing failure.

3.4 ANDJUSTING AND CLEANING
A. Repair damaged and defective woodwork, where possible, to eliminate functional and visual defects; where not possible to repair, replace woodwork. Adjust joinery for uniform appearance.

B. Clean, lubricate, and adjust hardware.

C. Clean woodwork on exposed and semi exposed surfaces. Touch up shop-applied finishes to restore damaged or soiled areas.

END OF SECTION

Page 448 of 805 ends

SECTION 07 1000

DAMPPROOFING
City of Montebello 07 1000 - 1
Fire Stations 56
Renovation
PART 1 – GENERAL

1.1 RELATED DOCUMENTS
A. The General Provisions of the Contract, including General and Supplementary Conditions and General Requirements (if any), apply to the work specified in this section.

1.2 SCOPE OF WORK
A. Provide all labor, materials, services and equipment required to complete the laminated sheet vapor barriers complete ready to receive concrete.

B. Vapor barriers are to be placed under all new interior on grade concrete slabs.

1.3 QUALITY ASSURANCE
A. The installer shall be experienced in placement of vapor barrier and shall be associated with waterproofing or roofing work.

1.4 SUBMITTALS
A. Manufacturer's Data, Laminated Vapor Barriers: For information only, submit two copies of specifications, installation instructions and general recommendations from the vapor barrier materials manufacturer's certification or other data substantiating that the materials comply with requirements. Indicate by copy of transmittal form that Installer has received copy of manufacturer's specifications, instructions and recommendations.

1.5 JOB CONDITIONS
A. Examination of Substrate: The Installer must examine the substrate and the conditions under which the vapor barrier work is to be performed and notify the Contractor in writing of unsatisfactory conditions. Do not proceed with the work until unsatisfactory conditions have been corrected projections through the vapor barriers have been installed.

B. Proceed with vapor barrier work only after substrate construction and framing of openings has been completed, and wood blocking, nailers, curbs, vents, drains and other projections through the vapor barrier have been installed.

C. Weather Conditions: Proceed with installation only when existing and forecasted weather conditions will permit the work to be performed in accordance with manufacturer's instructions and will permit the immediate installation of other work to be placed over the vapor barrier.

PART 2 - PRODUCTS

2.1 LAMINATED PLASTIC VAPOR BARRIER
A. Heavy Kraft papers laminated between sheets of inert polyethylene, reinforced with glass fibers, with vapor transmission of .10 perms or less (ASTM E-96).

B. Products offered by manufacturers to comply with the requirements include the following:

Moistop; as manufactured by Fortifiber Corp. or approved equal.

Page 449 of 805 ends

SECTION 07 1000

DAMPPROOFING
City of Montebello 07 1000 - 2
Fire Stations 56
Renovation

2.2 VAPOR BARRIER ACCESSORY MATERIALS
A. Adhesives: Provide the types of adhesives recommended by the vapor barrier manufacturer for the application shown and condition of installation in each case.

PART 3 - EXECUTION

3.1 INSTALLATION
A. Comply with manufacturer's instructions for the particular conditions of installation in each case. If printed instructions are not available or do not apply to the project conditions, consult the manufacturer's technical representative for specific recommendations before proceeding with the work.

B. Under Floor Slabs on Grade: Install the type indicated by the method indicated. Exercise care to avoid punctures. Extend coverage to extremity of areas to receive barrier. Attach wherever necessary with adhesive.

C. Seal joints in vapor barriers, and seal to other surfaces at extremities of coverage, by lapping and bonding with adhesives. Where adhesively sealed joints are not effective, and where nails or staples have been installed, seal with vapor barrier tape. Use vapor barrier tape or strips of vapor barrier material with adhesive to seal punctures, tears and penetrations through the barrier.

3.2 PROTECTION OF VAPOR BARRIERS
A. Do not allow foot traffic on vapor barriers. Proceed with vapor barrier installation ahead of the installation of insulation or other covering material only to the extent required for proper sequencing of the work.

B. The vapor-barrier installer shall advise the Contractor of required procedures for surveillance and protection of installed vapor barriers, so that continuing construction activities and the work of other trades will not result in punctures or other forms of damage or deterioration of the vapor barriers.

END OF SECTION

Page 450 of 805 ends

SECTION 07 2100

BUILDING INSULATION
City of Montebello 07 2100 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Batt Insulation at walls.

2. Vapor retardant.

3. Air infiltration seal.

B. Related Documents: The Contract Documents, as defined in Division 1 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents.

1.2 REFERENCES
A. American Society for Testing and Materials (ASTM):

1. ASTM C578 - Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation.

2. ASTM C665 - Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing.

3. ASTM D226 - Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing.

4. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.

B. Federal Specifications (FS):

1. FS HH-I-1972/GEN - Insulation Board, Thermal, Faced, Polyurethane or Polyisocyanurate.

1.3 SUBMITTALS
A. Division 1 - Submittals: Procedures for submittals. a. Product Data: Indicate product characteristics, performance criteria, and limitations.

1.4 QUALITY ASSURANCE
A. Regulatory Requirements: Conform to insulation flame spread and smoke developed requirements of local authority having jurisdiction.

B. Certification: For projects California provide Products certified by manufacturer that meet California Quality Standards for Insulating Materials.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Section 01 6000 - Product Requirements: Transport, handle, store, and protect Products.

B. Protect insulation from moisture, soiling and other damaging items.

C. Store in dry location protected from sunlight.

Page 451 of 805 ends

SECTION 07 2100

BUILDING INSULATION
City of Montebello 07 2100 - 2
Fire Stations 56
Renovation

1.6 ENVIRONMENTAL REQUIREMENTS
A. Resource Management:

1. Recycled Content: Provide fiberglass insulation manufactured from minimum 30 percent recycled glass.

B. Environmental Impact:

1. Only Greenguard indoor air quality certified products will be permitted.

2. Chlorofluorocarbons (CFCs): Products and equipment requiring or using CFCs during the manufacturing process will not be permitted.

PART 2 - PRODUCTS

2.1 BATT INSULATION
A. Manufacturers:

1. Johns Manville Corporation, Denver, Co (800) 654-3103.

2. Knauf Fiberglass, Shelbyville, IN (317) 398-4434, (800) 825-4434.

3. Owens-Corning Fiberglass Corporation, Toledo, OH (419) 248-8000, (800) 438-7465.

4. Section 01 6000 - Product Requirements: Product options and substitutions.

Substitutions: Permitted.

B. Materials: Fiberglass insulation manufactured from minimum 30 percent recycled glass.

1. Unfaced Glass Fiber: ASTM C 665, Type I, unfaced. Thermal resistance R-value as indicated on Drawings.

2. Faced Glass Fiber: ASTM C 665, Type III, Class A, with reflective covering one side.

Thermal resistance R-value as indicated on Drawings.

2.2 VAPOR RETARDANT
A. ASTM D 4397, 6 mils thick, maximum permeance rating of 0.13 perm.

B. Vapor Retardant Tape: Pressure-sensitive of type recommended by vapor retardant manufacturer for sealing joints and penetrations in vapor retardant.

2.3 AIR INFILTRATION SEAL
A. Manufacturer:

1. Tenneco Building Products, Smyrna, GA (800) 241-4402.

2. DuPont, Wilmington, DE (800) 448-9835.

3. Section 01 60 00 - Product Requirements: Product options and substitutions.

Substitutions: Permitted.

B. Materials: One of the following two types of materials:

1. 15-pound, type 1, grade D, 10-minute unperforated asphalt saturated organic felt in accordance with ASTM D22.

2. Coated, cross-woven polyethylene or polypropylene fabric:
a. Tenneco: Amowrap Housewrap.
b. DuPont: Tyvek Housewrap.
c. Air Infiltration Seal Tape: Pressure sensitive of type recommended by vapor retardant manufacturer for sealing joints and penetrations in air infiltration seal.

Page 452 of 805 ends

SECTION 07 2100

BUILDING INSULATION
City of Montebello 07 2100 - 3
Fire Stations 56
Renovation

2.4 ACCESSORIES
A. Tape: Polyethylene or polyester self-adhering type; 2 inches (5.08 cm) wide.

B. Adhesive: Waterproof type, acceptable to manufacturer of insulation board.

C. Wire Mesh: Galvanized steel, hexagonal wire mesh.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Section 01 7000 - Execution and Closeout Requirements: Verification of existing conditions before starting work.

B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.

1. Batt Insulation:
a. Verify adjacent materials are dry and ready to receive installation. b. Verify mechanical and electrical services within walls have been installed and tested.

C. Report in writing to Project Manager prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected.

D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.

3.2 INSTALLATION - BATT INSULATION
A. Install batt insulation in accordance with manufacturer's instructions, without gaps or voids.

B. Trim insulation neatly to fit spaces. Use batts free of damage. Fit insulation tight in spaces and tight to exterior side of mechanical and electrical services within the plane of insulation.

C. Install insulation with factory applied membrane facing warm side of building spaces. Lap ends and side flanges of membrane. Attach insulation in place to framing; tape seal butt ends and lapped side flanges. Tape seal tears or cuts in membrane.

3.3 INSTALLATION - VAPOR RETARDANT AIR INFILTRATION SEAL A. Install vapor retardant air infiltration seal over entire building exterior walls and adjacent surfaces B. Seal vertical joints over framing by lapping minimum 2 stud spaces. Fasten to framing at top, end, and bottom edges; at perimeter of wall openings; and at lap joints.

C. Seal joints caused by pipes, conduits, electrical boxes, and similar items with manufacturer's sealing tape. Seal penetrations air-tight.

END OF SECTION