SECTION 07 9200
JOINT SEALANTS
City of Montebello 07 9200 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Joint sealants.
2. Preparation for application of sealants.
B. Related Requirements:
1. Division 01 - General Requirements.
2. Section 06 4000 – Architectural Woodwork.
3. Division 08 - Openings.
6. Division 09 - Finishes.
7. Section 10 2813 - Toilet Accessories.
1.2 SUBMITTALS
A. Shop Drawings: Submit Shop Drawings indicating sealant joint locations, with full-size sealant joint details.
B. Product Data: Submit manufacturer's literature for each sealant material.
C. Material Samples: Submit Samples indicating color range available for each sealant material intended for installation in exposed locations.
D. Certifications: Submit manufacturer’s certification materials comply with requirements specified.
E. Site Samples: At locations required, provide a Sample of sealant for each typical installation, approximately 24 inches long, including joint preparation, backing, sealant and tooling. Allow backing to extend 6 inches beyond end of sealant for inspection of substrate.
F. Test Reports: Submit manufacturer's adhesion compatibility test reports according to ASTM C794 for each substrate.
1.3 QUALITY ASSURANCE
A. Qualifications of Installer: The Work of this section shall be installed by a firm which has been in the business of installing similar materials for at least five consecutive years; and can show evidence of satisfactory completion of five projects of similar size
SECTION 07 9200
JOINT SEALANTS
City of Montebello 07 9200 - 2
Fire Stations 56
Renovation
and scope. Installer shall have applicators trained and approved by manufacturer for performing this Work.
1.4 DELIVERY, STORAGE AND HANDLING
A. Store in accordance with manufacturer’s recommendations. Provide a uniform ambient temperature between 60- and 80-degrees F.
1.5 WARRANTY
A. Manufacturer: five-year material warranty.
B. Installer: two-year installation/application warranty.
PART 2 - PRODUCTS
2.1 GENERAL
A. Furnish sealants meeting following in-service requirements:
1. Normal curing schedules are permitted.
2. Non-staining, color fastness (resistance to color change), and durability when subjected to intense actinic (ultraviolet) radiation are required.
B. Furnish the products of only one manufacturer unless otherwise required, sealant colors as selected to match the adjoining surfaces.
2.2 MANUFACTURERS
A. Subject to compliance with project requirements, manufacturers offering specified items which may be incorporated into the work include the following:
1. Bostik, Inc.
2. Dow Corning.
3. GE Silicones.
4. Mameco International.
5. W.R. Meadows, Inc.
6. Nomaco, Inc.
7. Pecora Corporation.
8. Sika Corporation.
9. Sonneborn Building Products Div. ChemRex, Inc.
10. Tremco.
11. USG Corp.
12. Or approved equal.
SECTION 07 9200
JOINT SEALANTS
City of Montebello 07 9200 - 3
Fire Stations 56
Renovation
2.3 MATERIALS
A. Sealants:
1. Sealant 1: Acrylic latex, one-part, non-sag, mildew resistant acrylic emulsion compound complying with ASTM C834, Type S, Grade NS, formulated to be paintable.
a. Tremco Inc., Acrylic Latex Caulk.
b. Pecora Corporation, AC-20.
c. Equal.
2. Sealant 2: Butyl sealant, one-part, non-sag, solvent-release-curing sealant complying with ASTM C1311, gun grade and formulated with a minimum of 75 percent solids.
a. Tremco Inc., Tremco Butyl Sealant.
b. Pecora Corp., BC-158.
c. Equal.
3. Sealant 3: Silicone sealant, one-part non-acid-curing silicone sealant complying with ASTM C920, Type S, Grade NS, Class 25.
a. Dow Corning Corp., Dow Corning 790, 791, 795.
b. General Electric Co., Silpruf.
c. Tremco, Inc., Spectrem 1.
d. Pecora Corp., 864.
e. Equal.
4. Sealant 4: One-part mildew-resistant silicone sealant, complying with ASTM C920, Type S, Grade NS, Class 25.
a. Dow Corning Corp., Dow Corning 786.
b. General Electric Co., Sanitary 1700.
c. Tremco, Inc., Proglaze White.
d. Equal.
5. Sealant 5: One-part non-sag urethane sealant, complying with ASTM C920, Type S, Grade NS, Class 25.
a. Sika Corporation, Sikaflex -221e.
b. Equal.
6. Sealant 6: Multi-part pouring urethane sealant, complying with ASTM C920, Type M, Grade P, Class 25.
a. Sika Corporation, Sikaflex 2C NS/SL.
b. Equal.
SECTION 07 9200
JOINT SEALANTS
City of Montebello 07 9200 - 4
Fire Stations 56
Renovation
7. Sealant 7: Acoustical sealant, non-drying, non-hardening permanently flexible conforming to ASTM D217.
a. Pecora Corp., BA-98 Acoustical Sealant.
b. Equal.
B. See 07 8413 - Penetration Firestopping for rated sealants.
C. Joint Backing: ASTM D1056; round, closed cell Polyethylene Foam Rod; oversized 30 to 50 percent larger than joint width, reticulated polyolefin foam.
D. Primer: Non-Staining Type. Provide primer as required and shall be product of manufacturer of installed sealant.
E. Bond Breaker: Pressure sensitive tape recommended by sealant manufacturer.
F. Sealants shall have normal curing schedules, shall be nonstaining, color fast and shall resist deterioration due to ultraviolet radiation.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that joint openings are ready to receive Work and field tolerances are within the guidelines recommended by sealant manufacturer.
3.2 SURFACE PREPARATION
A. Joints and spaces to be sealed shall be completely cleaned of all dirt, dust, mortar, oil, and other foreign materials which might adversely affect sealing Work. Where necessary, degrease with a solvent or commercial degreasing agent. Surfaces shall be thoroughly dry before application of sealants.
B. If recommended by manufacturer, remove paint and other protective coatings from surfaces to be sealed before priming and installation of sealants.
C. Preparation of surfaces to receive sealant shall conform to the sealant manufacturer's specifications. Provide air pressure or other methods to achieve required results.
Provide masking tape to keep sealants off surfaces that will be exposed in finished Work.
D. Etch concrete or masonry surfaces to remove excess alkalinity, unless sealant manufacturer's printed instructions indicate that alkalinity does not interfere with sealant bond and performance. Etch with 5 percent solution of muriatic acid; neutralize with dilute ammonia solution, rinse thoroughly with water and allow to dry before sealant installation.
E. Perform preparation in accordance with ASTM C804 for solvent release sealants, and ASTM C962 for elastomeric sealants.
F. Protect elements surrounding Work of this section from damage or disfiguration.
SECTION 07 9200
JOINT SEALANTS
City of Montebello 07 9200 - 5
Fire Stations 56
Renovation
3.3 SEALANT APPLICATION SCHEDULE
Location Type Color
A. Exterior and Interior joints in Sealant 6 To match adjacent horizontal surfaces of concrete; material
between metal and concrete
masonry and mortar.
B. Exterior door, entrance and window Sealant 3 or 5 To match adjacent frames. Exterior and interior vertical material
joints in concrete and masonry
metal flashing.
C. Joints within glazed curtain wall Sealant 3 Translucent or system. Skylight framing system. Black
Aluminum entrance system
glass and glazing.
D. Interior joints in ceramic tile Sealant 4 Translucent or White and at plumbing fixtures.
E. Under thresholds. Sealant 2 Black
F. All interior joints not Sealant 1 To Match Adjacent
otherwise, scheduled Surfaces
G. Heads and sills, Sealant 7 Match Adjacent
perimeters of frames Surfaces
and other openings in
insulated partitions
3.4 APPLICATION
A. Provide sealant around all openings in exterior walls, and any other locations indicated or required for structure weatherproofing and/or waterproofing.
B. Sealants shall be installed by experienced mechanics using specified materials and proper tools. Preparatory Work (cleaning, etc.) and installation of sealant shall be as specified and in accordance with manufacturer's printed instructions and recommendations.
C. Concrete, masonry, and other porous surfaces, and any other surfaces if recommended by manufacturer, shall be primed before installing sealants. Primer shall be installed with a brush that will reach all parts of joints to be filled with sealant.
D. Sealants shall be stored and installed at temperatures as recommended by manufacturer. Sealants shall not be installed when they become too jelled to be discharged in a continuous flow from gun. Modification of sealants by addition of liquids, solvents, or powders is not permitted.
SECTION 07 9200
JOINT SEALANTS
City of Montebello 07 9200 - 6
Fire Stations 56
Renovation
E. Sealants shall be installed with guns furnished with proper size nozzles. Sufficient pressure shall be furnished to fill all voids and joints solid. In sealing around openings, include entire perimeter of each opening, unless indicated or specified otherwise.
Where gun installation is impracticable, suitable hand tools shall be provided.
F. Sealed joints shall be neatly pointed on flush surfaces with beading tool, and internal corners with a special tool. Excess material shall be cleanly removed. Sealant, where exposed, shall be free of wrinkles and uniformly smooth. Sealing shall be complete before final coats of paint are installed.
G. Comply with sealant manufacturer's printed instructions except where more stringent requirements are indicated on Drawings or specified.
H. Partially fill joints with joint backing material, furnishing only compatible materials, until joint depth does not exceed 1/2-inch joint width. Minimum joint width for metal-to-metal joints shall be 1/4 inch. Joint depth, shall be not less than 1/4 inch and not greater than 1/2 inch.
I. Install sealant under sufficient pressure to completely fill voids. Finish exposed joints smooth, flush with surfaces or recessed as indicated. Install non-tracking sealant to concrete expansion joints subject to foot or vehicular traffic.
J. Where joint depth prevents installation of standard bond breaker backing rod, furnish non-adhering tape covering to prevent bonding of sealant to back of joint. Under no circumstances shall sealant depth exceed 1/2 inch maximum, unless specifically indicated on Drawings.
K. Prime porous surfaces after cleaning. Pack joints deeper than 3/4 inch with joint backing to within 3/4 inch of surface. Completely fill joints and spaces with gun applied compound, forming a neat, smooth bead.
3.5 MISCELLANEOUS WORK
A. Sealing shall be provided wherever required to prevent light leakage as well as moisture leakage. Refer to Drawings for condition and related parts of Work.
B. Install sealants to depths as indicated or, if not indicated, as recommended by sealant manufacturer but within following general limitations:
1. For joints in concrete walks, slab and paving subject to traffic, fill joints to a depth equal to 75 percent of joint width, but not more than 3/4 inch deep or less than 3/8 inch deep, depending on joint width.
2. For building joints, fill joints to a depth equal to 50 percent of joint width, but not more than 1/2 inch deep or less than 1/4 inch deep.
3.6 CLEANING
A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site.
SECTION 07 9200
JOINT SEALANTS
City of Montebello 07 9200 - 7
Fire Stations 56
Renovation
3.7 CURING
A. Sealants shall cure in accordance with manufacturer's printed recommendations. Do not disturb seal until completely cured.
3.8 PROTECTION
A. Protect the Work of this section until Substantial Completion.
END OF SECTION
SECTION 08 1113
HOLLOW METAL FRAMES
City of Montebello 08 1113 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Hollow Metal frames.
B. Related Documents: The Contract Documents, as defined in Section 011000 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other documents.
C. Related Sections:
1. Section 08 1110 – Wood Door Frames
2. Section 08 7100 - Door Hardware: Hardware coordination.
3. Section 09 9100 - Painting: Field painting and finishing of doors and frames.
1.2 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM A 152 - Methods for Fire Tests of Door Assemblies.
2. ASTM A 653/A 653M - Standard Specification for Steel Sheets, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 1996.
B. Door Hardware Institute (DHI):
1. DHI - The Installation of Commercial Steel Doors and Steel Frames, Insulated Steel Doors in Wood Frames and Builder's Hardware.
2. DHI A115 Series - Specifications for Steel Doors and Frame Preparation for Hardware.
C. Steel Door Institute (SDI):
1. SDI-100 - Recommended Specifications Standard Steel Doors and Frames.
2. SDI-105 - Recommended Erection Instructions for Steel Frames.
1.3 SUBMITTALS
A. Section 01 3300 - Submittal Procedures: Procedures for submittals.
1. Product Data: Indicate door materials, gauges, configurations, and location of cut-outs hardware reinforcement, and finish.
a. Shop Drawings: Indicate door elevations, internal reinforcement, closure method, and cut-outs for louvers.
1.4 DELIVERY, STORAGE AND PROTECTION
A. Section 01 6000 - Product Requirements: Transport, handle, store, and protect products.
B. Protect doors and frames with resilient packaging.
C. Break seal on-site to permit ventilation.
SECTION 08 1113
HOLLOW METAL FRAMES
City of Montebello 08 1113 - 2
Fire Stations 56
Renovation
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Doors and frames shall be products of a single manufacturer.
B. Subject to compliance with project requirements, manufacturers offering items which may be incorporated in the Work include the following:
1. Amweld Building Products, Incorporated,
2. Ceco Door Products,
3. Curries Company,
4. Security Metal Products
5. Steelcraft,
6. Timely Industries
7. Or approved equal
2.2 MATERIALS
A. Steel Frame:
1. Interior Door Frames at new walls: 16-gauge, cold-rolled steel, mitered and welded frames with integral stops and trims, 2-inch profile, for installation in a metal OR wood stud and gypsum board partition. Use concealed fastenings, unless otherwise indicated.
2. Interior Door Frames at existing walls: 16-gauge, steel knock down S- series Frames with Trim for installation in existing metal OR wood stud gypsum board partitions. Commercial quality Carbon Steel ASTM A1008.
B. Steel thicknesses expressed in steel gages (MSG) is for reference only. Actual steel thicknesses must meet minimum requirements of ASTM standards and as described in ANSI/SDI A250.8.
C. Supports and Anchors: Fabricate from at least 16-gage, galvanized steel sheet. Frame anchors shall comply with fire rated label requirements of opening.
1. Floor Anchors:
a. Minimum thickness: 12 gage galvanized steel sheet or bent steel plate, securely fastened inside each jamb, with two holes in anchor at each jamb for 3/8-inch floor anchorage fasteners. For pre-framed wood stud walls provide and additional wood stud anchor located as close to the bottom of the jamb as is practical.
b. Where required at sloping and uneven floor conditions, or to coordinate adjustments for trim alignments, provide adjustable floor anchors, providing at least 2-inch height adjustments.
2. Jamb Anchors:
a. Locate anchors near top and bottom and at intermediate points not to exceed 24 inches on center. Provide two anchors per head for openings up to 48 inches wide; over 48 inches wide provide anchors at 24 inches on center maximum.
SECTION 08 1113
HOLLOW METAL FRAMES
City of Montebello 08 1113 - 3
Fire Stations 56
Renovation
b. Anchors in Stud Partitions: Provide steel anchors, 16 gage minimum sheet steel, of design to suit partition construction, securely welded inside each jamb.
c. Through-Frame Anchors: At frames indicated to be anchored with bolts through frame, provide countersunk holes for bolts with 16-gauge minimum sheet steel stiffeners full thickness of frame, and securely welded inside each frame at each hole.
D. Inserts, Bolts, and Fasteners: Provide manufacturer's standard units. Where zinc-coated items are to be built into exterior walls, comply with ASTM A153 Class C or D as required.
E. Head Reinforcing: Refer to Detail #2 of this section. Reinforcing shall not act as lintel or load-carrying member and shall comply with fire rating requirements. Provide at frames regardless of whether a closer is called for.
F. Hardware Reinforcement and Accessories:
1. Butt Hinge: 7 gage minimum.
2. Head assemblies: Reinforced internally with, full length, 10 gage angles on each side of frame and bar at bottom of stop for closer reinforcement in frames as shown in Detail #2 of this section.
3. Reinforcing for other items of finish hardware shall be accomplished according to ANSI A250.6.
4. Door Silencers: Except for exterior doors, drill and punch frames for three silencers at lock jamb of single swing doors or in double doors with astragal and one silencer per leaf in heads of doubled door frames.
2.3 ACCESSORIES
A. Rubber Silencers: Resilient rubber.
2.4 PROTECTIVE COATINGS
A. Bituminous Coating: Fibered asphalt emulsion.
B. Primer: Exposed surfaces shall be cleaned, treated with Bonderite chemical and given one baked-on shop coat of grey rust inhibiting primer.
2.5 FABRICATION
A. Fabricate unit’s rigid, neat, and free from warp or buckle. Fabricate KD. Weld exposed joints continuously; grind, dress, and make smooth, flush and invisible.
B. Reinforce units to receive surface applied finish hardware.
C. Prepare frame for silencers. Provide three single rubber silencers for single doors and two single silencers on frame head at double doors without mullions.
SECTION 08 1113
HOLLOW METAL FRAMES
City of Montebello 08 1113 - 4
Fire Stations 56
Renovation
D. Primer: Air dried.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 7300 - Execution: Verification of existing conditions before starting work.
B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.
C. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected.
D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.
3.2 INSTALLATION
A. Install frames in accordance with SDI-105.
B. Install doors in accordance with DHI.
C. Install doors in accordance with manufacturer's published instructions, of size, and at locations indicated.
D. Coordinate with adjacent wall construction for anchor placement.
E. Field paint doors and frames as specified in Section 099100.
F. The frame is to be mounted to the studding in such a manner to prevent a spreading of the frame from the studs of less than 1/2 inch.
3.3 CONSTRUCTION
A. Interface with Other Work:
1. Coordinate frame installation with size, location, and installation.
2. Coordinate with door opening construction, door frame, and door hardware installation.
B. Site Tolerances:
1. Maximum Diagonal Distortion: 1/16 inch measured with straight edge, corner to corner.
3.4 FIELD QUALITY CONTROL
A. Section 01 4000 - Quality Requirements: Field inspection.
B. Inspect metal door and frame installation, alignment, attachment to structure, and operation.
SECTION 08 1113
HOLLOW METAL FRAMES
City of Montebello 08 1113 - 5
Fire Stations 56
Renovation
3.5 ADJUSTING AND CLEANING
A. Adjust hardware for smooth and balanced door movement.
B. Section 01 7300 - Execution: Cleaning installed Work.
Payment for items of work covered under Division 8 of the plans and these specifications shall be based on the lump sum bid pricing identified in the Bid Schedule. No additional compensation will be allowed.
END OF SECTION
SECTION 08 1400
FLUSH WOOD DOORS
City of Montebello 08 1400 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Wood doors.
B. Related Requirements:
1. Division 01 - General Requirements.
2. Section 06 1000 - Rough Carpentry.
3. Section 08 1113 - Hollow Metal Doors and Frames
4. Section 08 7100 - Door Hardware.
5. Section 08 8000 - Glazing.
6. Section 09 9000 - Painting and Coating.
1.2 DESIGN REQUIREMENTS
A. Drawings indicate sizes, locations and general de tails of wood door construction and installation.
B. Regulatory Requirements:
1. Fire rated doors shall be listed by a nationally recognized testing and certification agency in accordance with local build ing codes and acceptable to the authorities having jurisdiction. The listed d oors shall meet or exceed the requirements of UL10B, NFPA 252 and NFPA 80. All door requiring fire- rating shall carry either a UL or ITS (Intertek Tes ting Services-Warnock Hersey) label.
2. ASTM E2074 – Standard Test Method for Fire Tests of Door Assemblies, Including Positive Pressure on Side-Hinged and Pivo ted Swinging Door Assemblies.
1.3 SUBMITTALS
A. Shop Drawings: Submit schedules, plans, elevation s and details indicating door construction details, opening identification symbol s, sizes, door type and grade, fire classification, swing, light and louver cutout size and locations, and undercuts.
B. Product Data: Submit manufacturers technical data for each specified door type, including details of wood species, design and const ruction, factory finishing specifications and installation instructions.
C. Construction Samples: Submit samples of not less than 6-inch by 6-inch for each type of door to be furnished, showing face, edge and core construction.
D. Color/finish Samples: Submit samples of not less than 4-inch by 6-inch on representative door finish and samples of 3-inch by 8-inch for the exposed edges.
Each sample shall bear a label identifying the job name, Architect, Contractor and the Woodwork Insitute finish system number.
SECTION 08 1400
FLUSH WOOD DOORS
City of Montebello 08 1400 - 2
Fire Stations 56
Renovation
E. Certificates:
1. Submit Certificate that solid core doors comply w ith all requirements of ANSI/WDMA I.S. 1-A.
2. Submit certification that fire rated doors comply with CBC Section 715 or UL 10B.
1.4 QUALITY ASSURANCE
A. Wood doors construction, manufacture, and fabricati on shall conform to ANSI/WDMA I.S. 1-A, custom grade, extra heavy duty grade including the latest revisions, and special requirements specified.
B. Doors shall be fabricated, hardware factory fitted and machined, and factory finished, unless noted otherwise.
C. Wood Door Finishes shall comply with the North Am erican Architectural Woodwork Standards (NAAWS) latest edition.
D. Doors shall be products of one manufacturer.
E. Door modifications are not permitted, unless revi ewed by the OAR.
1.5 DELIVERY, STORAGE AND HANDLING
A. Deliver materials in manufacturers original, unope ned, undamaged containers with identification labels intact.
B. Deliver doors to the Project site only after buil ding has been provided with design temperature and humidity.
C. Store and handle in accordance with ANSI/WDMA I.S .1-A. Store doors protected from exposure to harmful conditions and at temperat ure and humidity conditions recommended by the manufacturer.
1.6 PROJECT CONDITIONS
A. Do not install doors until building is enclosed a nd ambient conditions are within the temperature and humidity range to be expected during occupancy.
1.7 WARRANTY
A. Manufacturer shall provide a two year material wa rranty for exterior doors.
B. Manufacturer shall provide a life time material w arranty for interior doors.
C. Installer shall provide a two year fabrication an d installation warranty for all doors.
SECTION 08 1400
FLUSH WOOD DOORS
City of Montebello 08 1400 - 3
Fire Stations 56
Renovation
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Provide products manufactured by one of the follo wing:
1. Algoma Hardwood Inc.
2. Brentwood Manufacturing.
3. Eggers Industries.
4. Mohawk Flush Door, Inc
5. VT Industries, Inc.
6. Western Oregon Door.
7. Equal.
2.2 DOOR CONSTRUCTION
A. Interior Flush Doors:
1. Interior doors shall be furnished as follows:
a. Opaque Finished (Painted): Custom grade. Solid w ood core, 5 ply, MDO hardboard face, fully bonded to core.
2. Edge strips: Kiln-dried birch, maple or other mat erial as indicated. a. Opaque Finished Doors: Close grain hardwood.
3. Full stile edge strip shall be not less that 1 3/ 4 inches wide, two ply stile.
Stiles shall be fully bonded to the core. The oute r face stile shall be full length ¾ inch birch or maple. The inner back stile shall be ¾ inch of similar species which may have two finger joints fully bonded to core.
4. Top and bottom edge rails shall be full length an d may be of glued up stock of similar species as edge strip, white fir or doug las fir, minimum density
24.33 pounds or higher per cubic foot. Top rail sh all be minimum of 2 inches. Bottom rail shall be minimum of 5 inches fully bonded to core.
5. Crossbanding: Doors shall be furnished with full width crossbanding of properly dried hardwood or engineered fiber composi te material, 1/16 inch thick, with a density of 52 pounds or higher per cubic foot.
6. Opaque Finished Doors: Custom grade medium densit y overlay hardboard.
7. Adhesive and Bonding: Bonding between veneer pli es of wood face panel, and between door faces, frame and core unit shall b e fabricated with type I or II waterproof adhesives for interior doors.
8. Openings: Openings for vision panels, louvers and grilles shall be performed by the manufacturer, or in a certified doo r service mill in accordance with manufacturer’s details, and in comp liance with testing agency requirements.
SECTION 08 1400
FLUSH WOOD DOORS
City of Montebello 08 1400 - 4
Fire Stations 56
Renovation
9. Vision Panels: Vision panels in fire labeled doo rs shall be framed with FGS- 75 Fire Glass Stop by Anemostat, Air Louvers Inc. M odel VLF, or equal and shall be State Fire Marshall listed. Frame shall b e supplied with manufacturer’s standard baked-on enamel finish. In stall with tamperproof- head through bolts.
B. Fire Rated Doors:
1. Fire doors must meet the requirements of recogniz ed fire door tests and bear certifying labels of an approved independent testing agency.
2. With exception to the requirements that would adv ersely affect the fire rating, rated doors shall meet the specifications listed in this section.
3. Door shall be constructed that when installed as an assembly and tested it will pass ASTM E2074 “Standard Test Method for Fire Test of Door Assemblies Including Positive Pressure Testing of S ide-Hinged and Pivoted Swinging Door Assemblies,” and can be rated as required.
4. Reinforcement Blocking: Provide hardware reinforc ement blocking of size as required to secure specified hardware. Reinforceme nt blocking shall be in compliance with the manufacturer’s labeling requirements and shall not be of mineral material.
2.3 FINISHING:
A. FACTORY FINISHING:
1. Factory finishing shall be NAAWSI Custom Grade an d include all necessary preparation, materials and labor to provide an Opaque finish.
2. Finish faces, all four edges, edges of cutouts, a nd mortises. Stains and fillers may be omitted on top and bottom edges, edg es of cutouts, and mortises.
3. Finish: Resists UV and water damage, 100% acrylic formula, solid color wood stain, unless otherwise stated on section 09 9100.
4. Effect: Semifilled finish, produced by applying an additional finish coat to partially fill the wood pores.
5. Sheen: Semigloss.
B. JOB SITE FINISHING:
1. Doors indicated to be job site finished shall be factory back primed. a. Doors Scheduled for Opaque Paint finish: Prime wi th one coat of wood primer indicated on Section 09 9000 - Painting and Coating.
2. Door Finish: Per Section 09 9000 - Painting and C oating.
SECTION 08 1400
FLUSH WOOD DOORS
City of Montebello 08 1400 - 5
Fire Stations 56
Renovation
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions: Verify that field mea surements, surfaces, substrates and conditions are as required, and ready to receive Work.
B. Report in writing to City Representative prevaili ng conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected.
C. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.
3.2 INSTALLATION
A. Install non fire-rated doors in accordance with A WI Quality Standards requirements.
B. Machine cut fkor hardware. Install door hardware specified in Section 08 7100.
C. Install door louvers plumb and level.
D. Coordinate frame installation with size, location , and installation E. Coordiante with door opening construction, door fr ame, and door hardware installation.
F. Provide each door accurately cut, trimmed, and fi tted to its frame and hardware.
Clearance at lock and hanging stile and at top shal l not exceed 1/8 inch, and bottom shall not exceed 1/4 inch except where otherwise in dicated. Arises shall be rounded to a 1/16 inch radius, and lock rail edges shall be slightly beveled. Screws for hardware shall not be driven but screwed into pre-drilled holes.
G. Doors shall operate freely, but not loosely, with out sticking or binding, without hinge- bind conditions and with hardware properly adjusted and functioning.
3.3 CLEAN UP
A. Remove rubbish, waste and debris and legally disp ose of off the Project site.
3.4 PROTECTION
A. Protect the Work of this section until Substantia l Completion.
END OF SECTION
SECTION 08 3100
ACCESS DOORS AND PANELS
City of Montebello 08 3100 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Non-fire-resistive rated access door and frame units.
2. Wall and ceiling locations.
B. Related Documents: The Contract Documents, as defined in Division 1 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents.
C. Related Sections:
1. Section 22 4000 Plumbing Fixtures and Equipment.
1.2 SUBMITTALS
A. Division 1 - Submittal Procedures: Procedures for submittals.
1. Product Data: Sizes, types, finishes, hardware, scheduled locations, and details of adjoining work.
2. Shop Drawings: Indicate exact position of all access door units.
B. Section 01 7704 - Closeout Procedures and Training: Procedures for closeout submittals.
1. Project Record Documents: Accurately record the following:
a. Actual locations of all access units.
1.3 QUALITY ASSURANCE
A. Qualifications:
1. Manufacturer: Company specializing in manufacturing Products specified with minimum 5 years documented experience.
2. Installer: Company specializing in performing the Work of this Section with minimum 5 years documented experience.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Section 01 6000 - Product Requirements: Transport, handle, store, and protect Products.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Subject to compliance with project requirements, manufacturer's offering Products which may be incorporated in the Work include the following:
1. J.L. Industries, Bloomington, MN (612) 835-6850. (800) 554-6077.
2. Karp, Maspeth, NY (800) 888-4212.
SECTION 08 3100
ACCESS DOORS AND PANELS
City of Montebello 08 3100 - 2
Fire Stations 56
Renovation
3. Larsen's Manufacturing Company, Minneapolis, MN (800) 527-7367.
4. Milcor, Holland, OH (800) 861-6452.
B. Section 01 6000 - Product Requirements: Product options and substitutions. Substitutions:
Permitted.
2.2 ACCESS DOORS
A. Non-Fire-Rated: 20 gage recessed steel panel doors to accept field finish of drywall OR porcelain tile.
2.3 FABRICATION
A. Fabricate frames and flanges of 0.058-inch steel.
B. Fabricate door panels of 0.070-inch single thickness steel sheet.
C. Weld, fill, and grind joints to ensure flush and square unit.
D. Hardware:
1. Hinge: 175-degree stainless steel piano hinge heavy duty type concealed constant force closure spring type.
2. Lock: Screw driver slot for quarter turn cam lock unit.
2.4 FINISHES
A. Base Metal Protection: Prime coat units with alkyd primer. Color as noted on drawings.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 7300 - Execution: Verification of existing conditions before starting work.
B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.
1. Verify that rough openings for door and frame are correctly sized and located.
C. Report in writing to Project Manager prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected.
D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.
3.2 INSTALLATION
A. Install units in accordance with manufacturer's published instructions where indicated on Drawings and required for access.
SECTION 08 3100
ACCESS DOORS AND PANELS
City of Montebello 08 3100 - 3
Fire Stations 56
Renovation
B. Install frames plumb and level in opening. Secure rigidly in place.
C. Position unit to provide convenient access to concealed work requiring access.
3.3 CONSTRUCTION
A. Interface with Other Work: Coordinate with mechanical, electrical, and other Work requiring access units.
END OF SECTION
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 1
FIRE STATION #56
RENOVATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Door hardware, including electric hardware.
2. Power supplies for electric hardware.
3. Door position switches.
B. Related Divisions:
1. Division 08 1416 – Wood Doors
2. Division 08 4113 – Aluminum Entrances and Storefronts C. Specific Omissions: Hardware for the following is specified or indicated elsewhere.
1. Windows.
2. Cabinets, including open wall shelving and locks.
3. Signs.
4. Toilet accessories, including grab bars.
5. Installation.
6. Rough hardware.
7. Conduit, junction boxes & wiring.
1.2 REFERENCES :
A. Use date of standard in effect as of Bid date.
1. American National Standards Institute
a) ANSI 156.18 – Materials and Finishes.
2. BHMA – Builders Hardware Manufacturers Association
3. 2014 California Building Code
a) Chapter 11B – Accessibility to Public Buildings, Public Accommodations, Commercial Buildings and Public Housing
4. DHI – Door and Hardware Institute
5. NFPA – National Fire Protection Association
a) NFPA 80 2013 Edition – Standard for Fire Doors and Other Opening Protectives.
b) NFPA 105 – Smoke and Draft Control Door Assemblies
c) NFPA 252 – Fire Tests of Door Assemblies
6. UL – Underwriters Laboratories
a) UL10C – Positive Pressure Fire Tests of Door Assemblies. b) UL 305 – Panic Hardware
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 2
FIRE STATION #56
RENOVATION
7. WHI – Warnock Hersey Incorporated State of California Building Code
8. Local applicable codes
9. SDI – Steel Door Institute
10. WI – Woodwork Institute
11. AWI – Architectural Woodwork Institute
12. NAAMM – National Association of Architectural Metal Manufacturers
B. Abbreviations
1. Manufacturers: see table at 2.1.A of this section
2. Finishes: see 2.8 of this section.
1.3 SUBMITTALS & SUBSTITUTIONS
A. SUBMITTALS: Submit six copies of schedule per D. Only submittals printed one sided will be accepted and reviewed. Organize vertically formatted schedule into “Hardware Sets” with index of doors and headings, indicating complete designations of every item required for each door or opening. Minimum 10pt font size. Include following information:
1. Type, style, function, size, quantity, and finish of hardware items.
2. Use BHMA Finish codes per ANSI A156.18.
3. Name, part number and manufacturer of each item.
4. Fastenings and other pertinent information.
5. Location of hardware set coordinated with floor plans and door schedule.
6. Explanation of abbreviations, symbols, and codes contained in schedule.
7. Mounting locations for hardware.
8. Door and frame sizes, materials, and degrees of swing.
9. List of manufacturers used and their nearest representative with address and phone number.
10. Catalog cuts.
11. Point-to-point wiring diagrams.
12. Manufacturer’s technical data and installation instructions for electronic hardware.
13. Date of jobsite visit.
B. Bid and submit manufacturer’s updated/improved item if scheduled item is discontinued.
C. Deviations: Highlight, encircle or otherwise identify deviations from “Schedule of Finish Hardware” on submittal with notations clearly designating those portions as deviating from this section.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 3
FIRE STATION #56
RENOVATION
D. If discrepancy between drawings and scheduled material in this section, bid the more expensive of the two choices, note the discrepancy in the submittal and request direction from Architect for resolution.
E. Substitutions per Division 1. Include product data and indicate benefit to the Project. Furnish operating samples on request.
F. Furnish as-built/as-installed schedule with closeout documents, including keying schedule, riser and point-to-point wiring diagrams, manufacturers’ installation, adjustment and maintenance information, and supplier’s final inspection report.
1.4 QUALITY ASSURANCE :
A. Qualifications:
1. Hardware supplier: direct factory contract supplier who employs a certified architectural hardware consultant (AHC), available at reasonable times during course of work for project hardware consultation to Owner, Architect and Contractor.
a) Responsible for detailing, scheduling, and ordering of finished hardware. Detailing implies that the submitted schedule of hardware is correct and complete for the
intended function and performance of the openings.
B. Hardware: Free of defects, blemishes, and excessive play. Obtain each kind of hardware (latch and locksets, exit devices, hinges, and closers) from one manufacturer.
C. Exit Doors: Operable from inside with single motion without the use of a key or special knowledge or effort.
D. Fire-Rated Openings: NFPA 80 compliant. Hardware UL10C (positive pressure) compliant for given type/size opening and degree of label.
Provide proper latching hardware, non-flaming door closers, approved- bearing hinges, and resilient seals. Coordinate with wood door section for required intumescent seals. Furnish openings complete.
E. Furnish hardware items required to complete the work in accordance with specified performance level and design intent, complying with manufacturers’ instructions and code requirements.
F. Pre-Installation Meetings: Initiate and conduct with supplier, installer and related trades, coordinate materials and techniques, and sequence complex hardware items and systems installation. Include manufacturers' representatives of locks, panic hardware and door closers in the meetings.
Convene prior to commencement of related work.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 4
FIRE STATION #56
RENOVATION
1.5 DELIVERY, STORAGE AND HANDLING :
A. Delivery: coordinate delivery to appropriate locations (shop or field).
1. Permanent keys and cores: secured delivery direct to Owner’s representative.
B. Acceptance at Site: Items individually packaged in manufacturers’ original containers, complete with proper fasteners and related pieces. Clearly mark packages to indicate contents, locations in hardware schedule and door numbers.
C. Storage: Provide securely locked storage area for hardware, protect from moisture, sunlight, paint, chemicals, dust, excessive heat and cold, etc.
1.6 PROJECT CONDITIONS AND COORDINATION :
A. Where exact types of hardware specified are not adaptable to finished shape or size of members requiring hardware, provide suitable types having as practical the same operation and quality as type specified, subject to Architect’s approval.
B. Coordination: Coordinate hardware with other work. Furnish hardware items of proper design for use on doors and frames of the thickness, profile, swing, security, and similar requirements indicated, as necessary for proper installation and function, regardless of omissions or conflicts in the information on the Contract Documents. Furnish related trades with the following information:
1. Location of embedded and attached items to concrete.
2. Location of wall-mounted hardware, including wall stops.
3. Location of finished floor materials and floor-mounted hardware.
4. At masonry construction, coordinate with the anchoring and hollow metal supplier prior to frame installation by placing a strip of insulation, wood, or foam, on the back of the hollow metal frame behind the rabbet section for continuous hinges, as well as at rim panic hardware strike locations, silencers, coordinators, and door closer arm locations. When the frame is grouted in place, the backing will allow drilling and tapping without dulling or breaking the installer’s bits.
5. Locations for conduit and raceways as needed for electrical, electronic, and electro-pneumatic hardware items. Fire/life-safety system interfacing. Point-to-point wiring diagrams plus riser diagrams to related trades.
6. Coordinate: low-voltage power supply locations.
7. Coordinate: back-up power for doors with automatic operators.
8. Coordinate: flush top rails of doors at out swinging exteriors, and throughout where adhesive-mounted seals occur.
9. Manufacturers’ templates to door and frame fabricators.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 5
FIRE STATION #56
RENOVATION
C. Check Shop Drawings for doors and entrances to confirm that adequate provisions will be made for proper hardware installation.
D. Environmental considerations: segregate unused recyclable paper and paper product packaging, uninstalled metals, and plastics, and have these sent to a recycling center.
E. Prior to submittal, carefully inspect existing conditions to verify finished hardware required to complete Work, including sizes, quantities, existing hardware scheduled for re-use, and sill condition material. If conflict between the specified/scheduled hardware and existing conditions, submit a request for direction from Architect. Include date of jobsite visit in the submittal.
1. Submittals prepared without a thorough jobsite visit by a qualified hardware expert will be rejected as non-compliant.
1.7 WARRANTY :
A. Part of respective manufacturers’ regular terms of sale. Provide manufacturers’ written warranties.
B. Include factory order numbers with close-out documents to validate warranty information, required for Owner in making future warranty claims:
1. Minimum warranties:
a) Locksets: Three years
b) Extra Heavy-Duty Cylindrical Lock: Seven Years
c) Exit Devices: Three years mechanical
One year electrical
d) Closers: Thirty years mechanical
Two years electrical
e) Hinges: One year
f) Other Hardware Two years
1.8 COMMISSIONING :
A. Conduct these tests prior to request for certificate of substantial completion:
1. With the installer present, test door hardware operation with climate control system and stairwell pressurization system both at rest and while in full operation.
2. With the installer, access control contractor and electrical contractor present, test electrical, electronic, and electro-pneumatic hardware systems for satisfactory operation.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 6
FIRE STATION #56
RENOVATION
3. With installer and electrical contractor present, test hardware interfaced with fire/life-safety system for proper operation and release.
PART 2 PRODUCTS
2.1 MANUFACTURERS :
A. Manufacturers and their abbreviations used in this schedule:
GLY Glynn-Johnson Hardware
IVE H. B. Ives
LCN LCN Closers
SCE Schlage Electronics
SCH Schlage Lock Company
VON Von Duprin
ZER Zero International
2.2 HINGING METHODS :
A. Drawings typically depict doors at 90 degrees. Doors will swing to maximum allowable. Use wide-throw conventional or continuous hinges as needed up to 8 inches in width to allow door to stand parallel to wall for true 180-degree opening. Advise architect if 8-inch width is insufficient.
B. Conform to manufacturer’s published hinge selection standard for door dimensions, weight, and frequency, and to hinge selection as scheduled.
Where manufacturer’s standard exceeds the scheduled product, furnish the heavier of the two choices, notify Architect of deviation from scheduled hardware.
C. Conventional Hinges: Steel or stainless-steel pins and approved bearings.
The hinge opens widths minimum, but of sufficient throw to permit maximum door swing.
1. Out swinging exterior doors : non-ferrous with non-removable (NRP) pins and security studs.
2. Non-ferrous material exteriors and at doors subject to corrosive atmospheric conditions.
2.3 LOCKSETS, LATCHSETS, DEADBOLTS :
D. Extra Heavy-Duty Cylindrical Locks and Latches: as scheduled.
1. Chassis : cylindrical design, corrosion-resistant plated cold-rolled steel, through-bolted.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 7
FIRE STATION #56
RENOVATION
2. Locking Spindle : stainless steel, integrated spring, and spindle design.
3. Latch Retractors : forged steel. Balance of inner parts: corrosion- resistant plated steel, or stainless steel.
4. Latchbolt : solid steel.
5. Backset : 2.75 inches typically, as needed to accommodate frame, door, or other hardware.
6. Lever Trim : accessible design, independent operation, spring-cage supported, minimum 2.00 inches clearance from lever mid-point to door face.
7. Electric operation : Manufacturer-installed continuous duty solenoid.
8. Strikes : 16 gage curved steel, bronze or brass with 1.00-inch-deep box construction, lips of sufficient length to clear trim and protect clothing.
9. Lock Series and Design : Schlage D series, “Rhodes” design.
10. Certifications :
a) ANSI A156.2, 1994, Series 4000, Grade 1.
b) UL listed for A label and lesser class single doors up to 4 feet x 8 feet.
11. Accessibility: Require not more than 5 lb. to retract the latch bolt or deadbolt, or both, per CBC 2013 11B-404.2.7 and 11B-309.4.
E. Standard Duty Cylindrical Locks and Latches: as scheduled.
1. Chassis : cylindrical design, corrosion-resistant plated cold-rolled steel, through-bolted.
2. Locking Spindle : stainless steel, interlocking design.
3. Latch Retractors : forged steel. Balance of inner parts: corrosion- resistant plated steel or stainless steel.
4. Backset : 2.75 inches typically, as needed to accommodate frame, door, or other hardware.
5. Lever Trim : accessible design, independent operation, spring-cage supported, minimum 2.00 inches clearance from lever mid-point to face of door.
6. Lock Series and Design : Schlage AL series, “Saturn” design.
7. Certifications :
a) ANSI A156.2, 1994, Series 4000, Grade 2.
b) UL listed for A label and lesser class single doo rs up to 4 feet x 8 feet.
8. Accessibility: Require not more than 5 lb. to retract the latch bolt or deadbolt, or both, per CBC 2013 11B-404.2.7 and 11B-309.4.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 8
FIRE STATION #56
RENOVATION
2.4 EXIT DEVICES / PANIC HARDWARE
A. General features:
1. Independent lab-tested 1,000,000 cycles.
2. Push-through push-pad design. No exposed push-pad fasteners, no exposed cavities when operated. Return stroke fluid dampeners and rubber bottoming dampeners, plus anti-rattle devices.
3. Deadlocking latch bolts, 0.75-inch projection.
4. End caps : impact-resistant, flush-mounted. No raised edges or lips to catch carts or other equipment.
5. No exposed screws to show through glass doors.
6. Non-handed basic device design with center case interchangeable with all functions, no extra parts required to effect change of function.
7. Releasable in normal operation with 15-pound maximum operating force per UBC Standard 10-4, and with 32-pound maximum
pressure under 250-pound load to the door.
8. Exterior doors scheduled with XP-series devices : Static load force resistance of at least 2000 pounds.
9. Accessibility: Require not more than 5 lb. to retract the latch bolt, per CBC 2013 11B-404.2.7 and 11B-309.4.
a) Mechanical method: Von Duprin “AX- “feature, where
touchpad directly retracts the latch bolt with 5 lb. or less of force.
b) Electrical method: Von Duprin’s “RX-QEL- “where lightly pressing the touchpad with 5 lb. or less of force closes an electric switch, activating quiet electric latch retraction.
B. Specific features:
1. Non-Fire Rated Devices : cylinder dogging.
2. Lever Trim : breakaway type, forged brass, or bronze escutcheon min.
0.130-inch thickness, compression spring drive, match lockset lever design.
3. Rod and latch guards with sloped full width kickplates for doors fitted with surface vertical rod devices with bottom latches.
4. Fire-Labeled Devices : UL label indicating “Fire Exit Hardware.” Vertical rod devices less bottom rod (LBR) unless otherwise scheduled.
5. Impact recessed devices : 1.25-inch projection when push-pad is depressed. Sloped metal end caps to deflect carts, etc. No pinch points to catch skin between touch bar and door.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 9
FIRE STATION #56
RENOVATION
6. Delayed Egress Devices : Function achieved within single exit device component, including latch, delayed locking device, request-to-exit switch, nuisance alarm, remote alarm, key switch, indicator lamp, relay, internal horn, door position input, external inhibit input plus fire alarm input. NFPA 101 “Special Locking Arrangement” complaint.
7. Electrically Operated Devices : Single manufacturer source for electric latch retraction devices, electrically controlled trim, power transfers, power supplies, monitoring switches and controls.
8. Removable Mullions : Removable with single turn of building key.
Securely reinstalled without need for key. Furnish storage brackets for securely stowing the mullion away from the door when removed.
C. Surface Closers: [1461]
1. Full rack-and-pinion type cylinder with removable non-ferrous cover and cast-iron body. Double heat-treated pinion shaft, single piece forged piston, chrome-silicon steel spring.
2. ISO 2000 certified. Units stamped with date-of-manufacture code.
3. Independent lab-tested 5,000,000 cycles.
4. Non-sized, non-handed and adjustable. Place closer inside the building, stairs, and rooms.
5. Plates, brackets, and special templating when needed for interface with a particular header, door and wall conditions and neighboring hardware.
6. Adjust doors to open with not more than 5.0-pounds pressure to open at exterior doors and 5.0-pounds at interior doors. As allowed per 2013 California Building Code Section 11B-404.2.9, local authority may increase the allowable pressure for fire doors to achieve positive latching, but not to exceed 15-pounds.
7. Separate adjusting valves for closing speed, latching speed and backcheck, fourth valve for delayed action where scheduled.
8. Extra-duty arms (EDA) at exterior doors scheduled with parallel arm units.
9. Exterior door closers : tested to 100 hours of ASTM B117 salt spray test, furnish data on request.
10. Exterior doors : seasonal adjustments not required for temperatures from 120 degrees F to 0 degrees F, furnish checking fluid data on request.
11. Non-flaming fluid will not fuel door or floor covering fires.
12. Pressure Relief Valves (PRV) not permitted.
2.7 OTHER HARDWARE
A. Automatic Flush Bolts: Low operating force design.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 10
FIRE STATION #56
RENOVATION
B. Overhead Stops: Non-plastic mechanisms and finished metal end caps.
Field-changeable hold-open, friction and stop-only functions.
C. Kick Plates: Four beveled edges, .050 inches minimum thickness, height, and width as scheduled. Sheet-metal screws of bronze or stainless steel to match other hardware.
D. Doorstops: Provide stops to protect walls, casework, or other hardware.
1. Unless otherwise noted in Hardware Sets, provide floor type with appropriate fasteners. Where floor type cannot be used, provide wall type. If neither can be used, provide overhead type.
2. Locate overhead stops for maximum opening. Consult with Owner for furniture locations. Minimum: 90deg stop / 95deg dead stop. Note degree of opening in submittal.
E. Sound-reducing adjustable seals: coordinate lockset backsets, rim exit device strikes, and parallel arm closers. Fabricate 7ga “Z”-brackets as bridging pieces to facilitate installation. Brackets: mild carbon steel, or stainless steel.
F. Automatic door bottoms: low operating force units. Doors with automatic door bottoms plus head and jamb seals cannot require more than two pounds operating force to open when the closer is disconnected.
1. Include automatic type door bottoms, as opposed t o fixed sweeps, at stairs and elevator lobbies to allow fine-tuning of pressurization systems.
G. Thresholds: As scheduled and per details. Comply with CBC 2013 11B- 404.2.5. Substitute products: certify that the products equal or exceed specified material’s thickness. Proposed substitutions: submit for approval.
2. Saddle thresholds : 0.125 inches minimum thickness.
3. Exteriors : Seal perimeter to exclude water and vermin. Use sealant complying with requirements in Division 7 "Thermal and Moisture Protection". Minimum 0.25-inch diameter fasteners and lead expansion shield anchors, or Red-Head #SFS-1420 (or approved equivalent) Flat Head Sleeve Anchors. National Guard Products’ “COMBO” or Pemko Manufacturing’s “FHSL.”
4. Fire-rated openings, 90-minutes or less duration : use thresholds to interrupt floor covering material under the door where that material has a critical radiant flux value less than 0.22 watts per square centimeter, per NFPA 253. Use threshold unit as scheduled. If none scheduled, include a 0.25in high 5in wide saddle in the bid, and request direction from Architect.
5. Fire-rated openings, 3-hour duration : Thresholds, where scheduled, to extend full jamb depth.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 11
FIRE STATION #56
RENOVATION
6. Acoustic openings : Set units in full bed of Division-7-compliant, leave no air space between threshold and substrate.
7. Plastic plugs with wood or sheet metal screws are not an acceptable substitute for specified fastening methods.
8. Fasteners : Exposed screws to be Phillips or Robertson drive.
Pinned TORX drive at high security areas. Flat head sleeve anchors (FHSL) may be slotted drive. Sheet metal and wood screws: full thread. Sleeve nuts: full length to prevent door compression.
H. Through-bolts: Do not use. Coordinate with wood doors; ensure provision of proper blocking to support wood screws for mounting panic hardware and door closers. Coordinate with metal doors and frames; ensure provision of proper reinforcement to support machine screws for mounting panic hardware and door closers.
1. Exception : surface-mounted overhead stops, holders, and friction stays.
I. Silencers: Interior hollow metal frames, 3 for single doors, 4 for pairs of doors. Leave no unfilled/uncovered pre-punched silencer holes. Intent:
door bears against silencers, seals make minimal contact with minimal compression – only enough to affect a seal.
2.8 FINISH :
A. Generally: BHMA 626 Satin Chromium.
1. Areas using BHMA 626: furnish push-plates, pulls and protection plates of BHMA 630, Satin Stainless Steel, unless otherwise scheduled.
B. Door closers: factory powder coated to match other hardware, unless otherwise noted.
1. Provide satin-chrome plated arms, tracks and covers where scheduled bright metallic powder coat (MTLPC) not available.
2.9 KEYING REQUIREMENTS :
A. Key System: existing Keying system. Initiate and conduct meeting(s) with Owner to determine system structure, furnish Owner’s written approval of the system; do not order keys or cylinders without written confirmation of actual requirements from the Owner. Furnish temporary construction- keyed and permanent cylinders. Contractor to demonstrate to the Owner that temporary keys no longer operate the locking cylinders at the end of the project.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 12
FIRE STATION #56
RENOVATION
PART 3 - EXECUTION
3.1 ACCEPTABLE INSTALLERS :
A. Can read and understand manufacturers’ templates, suppliers’ hardware schedule and printed installation instructions. Can readily distinguish drywall screws from manufacturers’ furnished fasteners. Available to meet with manufacturers’ representatives and related trades to discuss installation of hardware.
3.2 PREPARATION :
A. Ensure that walls and frames are square and plumb before hardware installation. Make corrections before commencing hardware installation.
Installation denotes acceptance of wall/frame condition.
B. Locate hardware per SDI-100 and applicable building, fire, life-safety, accessibility, and security codes.
1. Notify Architect of code conflicts before ordering material.
2. Locate latching hardware between 34 inches to 44 inches above the finished floor, per California Building Code, Section 1008.1.9.2 and 11B-404.2.7.
3. Locate panic hardware between 36 inches to 44 inches above the finished floor.
4. Where new hardware is to be installed near existing
doors/hardware scheduled to remain, match locations of existing hardware.
C. Overhead stops before installing, determine proposed locations of furniture items, fixtures, and other items to be protected by the overhead stop's action.
D. Existing frames and doors to be retrofitted with new hardware :
1. Field-verify conditions and dimensions prior to ordering hardware.
Fill existing hardware cut outs not being reused by the new hardware. Remove existing hardware not being reused, return to Owner unless directed otherwise.
2. Remove existing floor closers not scheduled for reuse, fill cavities with non-shrinking concrete and finish smoothly.
3. Cut and weld existing steel frames currently prepared with 2.25- inch height strikes. Cut an approximate 8-inch section from the strike jamb and weld in a reinforced section to accommodate specified hardware’s strike.
4. Patch and weld flush filler pieces into existing door hardware preparations in steel doors and frames, leave surfaces smooth.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 13
FIRE STATION #56
RENOVATION
5. Glue in solid wood block fillers to fill cut outs in existing wood doors, sand surfaces smooth. Alternatively, use an approved epoxy-based wood filler product, submit product data for approval.
3.3 INSTALLATION
A. Install hardware per manufacturer’s instructions and recommendations.
Do not install surface-mounted items until finishes have been completed on substrate. Set units level, plumb and true to line and location. Adjust and reinforce attachment substrate for proper installation and operation.
Remove and reinstall or replace work deemed defective by Architect.
1. Gaskets : install jamb-applied gaskets before closers, overhead stops, rim strikes, etc.; fasten hardware over and through these seals. Install sweeps across bottoms of doors before astragals, cope sweeps around bottom pivots, trim astragals to tops of sweeps.
2. When hardware is to be attached to existing metal surface and insufficient reinforcement exists, use RivNuts, NutSerts or similar anchoring device for screws.
3. Use manufacturers' fasteners furnished with hardware items or submit Request for Substitution with Architect.
4. Replace fasteners damaged by power-driven tools.
B. Locate floor stops no more than 4 inches from walls and not within paths of travel. See paragraph 2.2 regarding hinge widths, door should be well clear of point of wall reveal. Point of door contact no closer to the hinge edge than half the door width. Where a situation is questionable or difficult, contact Architect for direction.
C. Core concrete for exterior door stop anchors. Set anchors in approved non-shrink grout.
D. Locate overhead stops for minimum 90 degrees at rest and for maximum allowable degree of swing.
E. Drill pilot holes for fasteners in wood doors and/or frames.
F. Lubricate and adjust existing hardware scheduled to remain. Carefully remove and give to Owner items not scheduled for reuse.
G. Field-verify existing conditions and measurements prior to ordering hardware. Fill existing hardware cut outs not being used by the new hardware.
H. Remove existing hardware not being reused. Tag and bag removed hardware, turn over to Owner.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 14
FIRE STATION #56
RENOVATION
I. Where existing wall conditions will not allow door to swing using the scheduled hinges, provide wide-throw hinges and if needed, extended arms on closers.
J Provide manufacturer’s recommended brackets to accommodate the mounting of closers on doors with flush transoms.
3.4. ADJUSTING
A. Adjust and check for proper operation and function. Replace units, which cannot be adjusted to operate freely and smoothly.
1. Hardware damaged by improper installation or adjustment methods: repair or replace to Owner’s satisfaction.
2. Adjust doors to fully latch with no more than 1 pound of pressure. a) Door closer valves: turn valves clockwise until a t bottom – do not force. Turn valves back out one and one-half turns and begin adjustment process from that point. Do not force valves beyond three full turns counterclockwise.
3. Adjust delayed-action closers on fire-rated doors to fully close from fully opened position in no more than 10 seconds.
4. Adjust door closers per 1.9 this section.
A. Inspection of fire door assemblies and means-of-egress panic-hardware doors: Per 2013 NFPA-80 5.2.1: hire an independent third-party inspection service to prepare a report listing these doors and include a statement that there are zero deficiencies with the fire-rated assemblies and the openings with panic hardware.
B. Fire-rated doors:
1. Wood doors : adjust to 0.125 inches clearance at heads, jambs, and meeting stiles.
2. Steel doors : adjust to 0.063 inches minimum to 0.188 inches maximum clearance at heads, jambs, and meeting stiles.
3. Adjust wood and steel doors to 0.75 inches maximum clearance (undercut) above threshold or finish floor material under door.
C. Final inspection: Installer to provide letter to Owner that upon completion installer has visited the Project and has accomplished the following:
1. Has re-adjusted hardware.
2. Has evaluated maintenance procedures and recommended changes or additions and instructed Owner’s personnel.
3. Has identified items that have deteriorated or failed.
4. Has submitted a written report identifying problems.
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 15
FIRE STATION #56
RENOVATION
3.5 DEMONSTRATION :
A. Demonstrate mechanical hardware and electrical, electronic, and pneumatic hardware systems, including adjustment and maintenance procedures.
3.6 PROTECTION/CLEANING :
A. Cover installed hardware, protect from paint, cleaning agents, weathering, carts/barrows, etc. Remove covering materials and clean hardware just prior to substantial completion.
B. Clean adjacent wall, frame and door surfaces soiled from installation / reinstallation process.
3.7 SCHEDULE OF FINISH HARDWARE
A. See door schedule in drawings for hardware set assignments.
B. Do not order material until submittal has been reviewed, stamped, and signed by Architect’s door hardware consultant.
HARDWARE SET
Hardware Group No. 001
For use on Door #(s):
110-3
Provide each SGL door(s) with the following:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 3CB1 4.5 X 4.5 NRP 630 IVE
1 EA CLASSROOM LOCK L9070L 17A 626 SCH
1 EA MORTISE CYLINDER TO MATCH BLDG STANDARD 626 TBD
1 EA SURFACE CLOSER 1461 SCUSH FC 689 LCN
1 EA GASKETING 188SBK PSA BK ZER
1 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD 546A-223 A ZER
NEW LOCK LEVER DESIGN TO MATCH EXISTING FIRE STATION STANDARD - FIELD VERIFY
EXISTING CONDITION
WEATHER SEAL BY A LUMINUM STOREFRONT DOOR AND FRAME MANUFACTURER
SECTION 08 7100
DOOR HARDWARE
CITY OF MONTEBELLO 08 7100 - 16
FIRE STATION #56
RENOVATION
Hardware Group No. 002
For use on Door #(s):
137-1 139-1 140-1
Provide each SGL door(s) with the following:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 3CB1 4.5 X 4.5 630 IVE
1 EA PRIVACY LOCK ND40S SPA 626 SCH
1 EA OH STOP 100S 630 GLY
1 EA SURFACE CLOSER 1461 REG OR PA AS REQ 689 LCN
1 EA KICK PLATE 8400 10" X 2" LDW 630 IVE
1 EA WALL STOP WS406/407CCV 630 IVE
1 EA GASKETING 188SBK PSA BK ZER
GRANITE THRESHOLD BY FLOORING SECTION
NEW CYLINDRICAL LOCK LEVER DESIGN TO MATCH EXISTING FIRE STATION BUILDING
STANDARD - FIELD VERIFY EXISTING CONDITION
OVERHEAD STOP
END OF SECTION
SECTION 09 0565
MOISTURE TESTING FOR FLOORING INSTALLATION
City of Montebello 09 0565 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Moisture, alkali and bond testing of existing and new concrete slabs on grade and elevated slabs scheduled to receive adhered flooring.
B. Related Requirements:
1. Division 01 - General Requirements.
2. Section 03 3000: Cast-in-Place Concrete; concrete slab curing.
3. Division 09 Finishes: Flooring Sections.
1.2 REFERENCES
A. ASTM International (ASTM):
1. ASTM D7234 – Standard Test Method for Pull-Off Adhesion Strength of Coatings on Concrete Using Portable Pull-Off Adhesion Testers.
2. ASTM F710 – Practice for Preparing Concrete Floors to Receive Resilient Flooring.
3. ASTM F1869 – Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride.
4. ASTM F2170 – Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes.
1.3 TESTING REQUIREMENTS
A. Perform the following tests:
1. At new and existing concrete slabs on grade and below grade:
a. Moisture Vapor Emission Rate testing per ASTM F1869. b. Relative Humidity testing per ASTM F2170.
c. pH testing per ASTM F710.
d. Bond testing per D7234 or manufacturer recommendations.
1.4 SUBMITTALS
A. Floor Covering and Adhesive Manufacturers' Product Literature: For each specific combination of substrate, floor covering, and adhesive to be used; indicating:
SECTION 09 0565
MOISTURE TESTING FOR FLOORING INSTALLATION
City of Montebello 09 0565 - 2
Fire Stations 56
Renovation
1. Moisture, humidity and pH limits.
2. Manufacturer's bond/compatibility test procedure.
B. Test Report: Submit on chart form with small scale floor plans showing the location of each test performed.
1. Submit report for relative humidity test in accordance to ASTM F2170.
Include pH, moisture vapor emission, and adhesion test results.
2. Indicate areas where the test results exceed the floor covering manufacturer's limits and indicate proposed remediation procedures.
1.5 QUALITY ASSURANCE
A. Tests indicated in this Section shall be performed by CONTRACTOR or a qualified independent testing agency retained and paid by CONTRACTOR. OWNER may perform testing at its own expense to compare to CONTRACTOR’s test results.
B. Testing kits:
1. Moisture-Vapor Emission: Prepackaged anhydrous ca lcium chloride test kits conforming to requirements of ASTM F-1869.
2. Alkalinity: Calibrated digital pH meter in accord ance with ASTM F-710.
3. Relative Humidity: Relative humidity concrete moi sture testing equipment conforming to ASTM F-2170.
C. Chemically based products such as sealers, primers, fillers and adhesives, shall be approved by the OWNER’s Office of Environmental Health and Safety (OEHS).
1.6 ENVIRONMENTAL CONDITIONS
A. Project areas to be tested shall be at the same t emperature and humidity expected during normal use. These temperature and humidity levels shall be maintained for 48 hours prior to, and during the testing. If this is not possible, temperature and relative humidity ranges shall be within ranges indicated in the applicable ASTM test method.
PART 2 – PRODUCTS – NOT USED
PART 3 - EXECUTION
3.1 PREPARATION
A. Testing shall take place after allowing concrete to dry for a minimum of 90 days.
B. Prior to test placement, CONTRACTOR shall clean c oncrete slabs and have them free of foreign substances, such as residual adhesives, curing or hardening compounds, adhesive removers, sealers, paints and other foreig n materials that might prevent adhesive bond. These materials shall be removed not less than 24 hours prior to the
SECTION 09 0565
MOISTURE TESTING FOR FLOORING INSTALLATION
City of Montebello 09 0565 - 3
Fire Stations 56
Renovation
placement of the test kits. Testing when floor coverings have never been installed may waive the 24 hour wait period.
C. The test site temperature and humidity shall be i n conformance to Article “Environmental Conditions”.
D. Minimum number of tests: For Moisture Vapor Emission Rate, Relative Humidity and pH testing, provide three for the first 1,000 square feet of floor area, and at least one for each additional 1,000 square feet or fraction thereof.
3.2 MOISTURE VAPOR EMISSION TESTING (MVEP)
A. MVEP testing shall be performed in accordance to ASTM F1869.
B. Unless more stringent requirements are recommended by flooring manufacturer, the maximum allowable moisture release at time of flooring installation shall be three pounds per 24 hours per 1,000 square feet.
C. Weigh test dish on site prior to start of test. S cale must report weight to 0.1 grams. Record weight and start time. Expose Calcium Chloride and set dish on concrete surface. Install test containment dome and allow test to proceed for 60 – 72 hours.
D. Retrieve the test dish by carefully cutting throu gh containment dome. Close and reseal test dish. Weigh test dish on site recording weight and stop time. Calculate and report results as "pounds of emission per 1,000 sq. ft. per 24 hours".
E. In the event the MVEP value exceeds the value spe cified in this Article and the flooring manufacturer recommended limits, CONTRACTOR shall p ropose remediation to OWNER. In new concrete slab construction, remediation shall be at no cost to OWNER.
3.3 RELATIVE HUMMIDITY TESTING
A. Relative humidity testing shall be performed in conformance to ASTM F2170.
B. Choose test areas where high moisture levels are suspected. Holes in new concrete slabs may be cast or drilled. Depth of holes shall be 40% of slab thickness for slabs drying only from the top, and 20% when drying from top and bottom, as indicated on ASTM F2170. Determine the concrete thickness of each type of slab to be tested and calculate depth of holes.
1. Hole shall be drilled dry; do not use water for c ooling or lubrication. Drill holes in the concrete and insert test liners. Hole shall not be more than 0.04 inches, or one millimeter, larger than the test liner.
2. Before placing concrete, secure liner tube to for mwork or steel reinforcing to avoid displacement during concrete placement, conso lidation and finishing.
Secure a solid rod into the liner and protruding slightly above the top of the liner to exclude fresh concrete from entering the liner.
C. Clean the area around the hole with a vacuum clea ner and vacuum the dust out of the hole. Immediately, set the sleeve by tapping the sleeve into the hole with a hammer or mallet.
SECTION 09 0565
MOISTURE TESTING FOR FLOORING INSTALLATION
City of Montebello 09 0565 - 4
Fire Stations 56
Renovation
D. Remove the sleeve plug and place probe into the s leeve assuring that it reaches the bottom of the test hole. Connect the probe lead wire to the meter, and turn meter on.
Allow time for the probe to sit in the test sleeve to achieve moisture equilibrium before taking relative humidity readings. Probe shall be at the same temperature as the concrete before the reading. Check for drift and f ollow meter manufacturer recommendations.
E. Record the relative humidity to the nearest perce nt and temperature to the nearest degree. Record location of hole within the structure and depth of probe. Use the relative humidity probe to measure the ambient air temperature and relative humidity above the slab in the vicinity of the test location. Remove the liner and fill the hole with a cementitious patching compound.
F. In the event the relative humidity exceeds 75% an d the flooring manufacturer recommended limits, CONTRACTOR shall propose remediation to OWNER. In new concrete slab construction, remediation shall be at no cost to OWNER.
3.4 PH LEVEL TESTING
A. Perform testing in accordance to ASTM F710, and a t the same time as the vapor emission and relative humidity tests.
B. Place several drops of water onto the concrete su rface to form a puddle approximately 1” in diameter. Allow the water to set for 60 +/- 5 seconds. Dip the pH paper into the water and remove immediately, compare color to chart provided by paper supplier to determine pH reading. Record and report results.
C. When using pH Pencil and pH Meters, follow the in strument manufacturer’s instructions.
D. The surface of the concrete should have a pH of 9 or less. In the event the pH exceeds this value and the flooring manufacturer recommended pH limits, CONTRACTOR shall propose remediation to OWNER. In new concrete slab construction, remediation shall be at no cost to OWNER.
3.5 BOND TEST
A. Perform bond testing in accordance to ASTM D4541 or per manufacturer’s recommendations.
B. Select appropriate locations for the bond tests s uch as near walls or in light traffic areas.
Spaced test samples approximately 50 feet apart throughout the designated installation area. Number of tests will be as determined by the recommended spacing of 50 feet.
C. Use the flooring material and recommended adhesiv es. Install 3' x 3' panels using the exact techniques that will be used for the flooring installation. It is recommended that tests be spaced approximately 50 feet apart throughout the designated installation area.
Tape edges of panels to prevent edge drying of adhesive. Protect test panel from traffic.
D. After 72 hours of placing the flooring, remove ta pe and observe whether it is bonded tightly to the floor, by trying to lift the edges with a scraper or other means, or pull flooring from the subfloor by hand. Determine if bonding is suitable for flooring installation.
SECTION 09 0565
MOISTURE TESTING FOR FLOORING INSTALLATION
City of Montebello 09 0565 - 5
Fire Stations 56
Renovation
E. At locations where membrane, primer, leveler or p atch are applied, perform applicable bond testing recommended by flooring manufacturer to assure adequate bondage of flooring to substrate.
F. Success or failure shall be determined by visual interpretation and the amount of physical effort required to remove the floor covering. If the flooring material can be removed it will indicate failure of the bond test. If the flooring requires a great deal of effort to pull it up, the bond test can be considered successful, providing no sign of moisture is found. In the event that bond failure occurs in new concrete slab construction, remediation shall be at no cost to OWNER.
3.6 CLEAN UP
A. Remove rubbish, debris and waste materials and le gally dispose of off the Project site.
3.7 PROTECTION
A. Protect the Work of this section until installati on of finish flooring.
END OF SECTION
SECTION 09 2800
CEMENT BOARD
City of Montebello 09 2800 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cement board and accessories.
B Related Sections
1. Section 06 1000 – Rough Carpentry.
2. Section 07 1000 – Damproofing.
3. Section 07 9200 – Joint Sealants.
4. Section 09 2900 – Gypsum Board.
5. Section 09 3000 – Tile.
1.2 REFERENCES
A. American National Standards Institute (ANSI):
1. A108.11, American National Standard for Interior Installation of Cementitious Backer Units.
2. A118.1, American National Standard Specifications for Dry-Set Portland Cement Mortar.
3. A118.4, American National Standard Specifications for Latex-Portland Cement Mortar.
4. A118.9, Test Methods and Specifications for Cementitious Backer Units.
5. A136.1, American National Standard Specifications for Organic Adhesives for Installation of Ceramic Tile.
B. American Society for Testing and Materials (ASTM):
1. C 473, Test Methods for Physical Testing of Gypsum Panel Products.
2. C 1325, Specification for Fiber-Mat Reinforced Non-Asbestos Cement Interior Substrate Sheets.
3. C 1002, Specification for Steel Drill screws for the Application of Gypsum Panel Products or Metal Plaster Bases.
4. D 2394, Methods for Simulated Service Testing of Wood and Wood-Based Finish Flooring.
1.3 SUBMITTALS
A. Product Data: Manufacturers' specifications and installation instructions for each product specified.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Packaging and Shipping: Have materials shipped in manufacturer's original packages showing manufacturer's name and product brand name.
B. Storage and Protection: Store materials inside and protected from damage by the elements. Protect ends, edges, and faces of cement boards from damage.
SECTION 09 2800
CEMENT BOARD
City of Montebello 09 2800 - 2
Fire Stations 56
Renovation
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. National Gypsum Company.
1. Cement Board:
a. Tile Backer: PermaBase ® BRAND Cement Board OR Equal. b. Underlayment: PermaBase BRAND Underlayment OR Equal.
2.2 MATERIALS
A. Cement Board:
1. Backer Board: Cementitious, water durable, board; surfaced with fiberglass reinforcing mesh on front and back; long edges wrapped; and complying with ANSI A118.9 and ASTM C 1325 (PermaBase BRAND Cement Board).
a. Thickness: 5/8 in.
b. Width: 4 ft.
c. Length: 8 ft.
d. Edges: Tapered.
e. Compressive Strength: Not less than 2250 lbs. per sq. in. when tested in accordance with ASTM D 2394.
f. Water Absorption: Not greater than 8 percent when tested for 24 hours in accordance with ASTM C 473.
2. Underlayment: Cementitious, water durable, board; surfaced with fiberglass reinforcing mesh on front and back; long edges wrapped; and complying with ANSI A118.9 and ASTM C.
a. Thickness: 1/4 in.
b. Width: 3 ft. or 4 ft.
c. Length: 4 ft. or 5 ft.
d. Edges: Tapered.
e. Compressive Strength: Not less than 2250 lbs. per sq. in. when tested in accordance with ASTM D 2394.
f. Water Absorption: Not greater than 8 percent when tested for 24 hours in accordance with ASTM C 473.
4. Fasteners:
a. Nails: 1-1/2-in. long, hot dipped galvanized, and in accordance with FS FF-N-105B, Type 2, Style 20.
b. Screws: Hi-Lo thread screws (No. 8) wafer head, corrosion- resistant, 1-1/4 in. or 1-5/8 in. long, and complying with ASTM C 1002.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: In accordance with the following reference standards and manufacturer’s recommendations: ANSI A108.11.
SECTION 09 2800
CEMENT BOARD
City of Montebello 09 2800 - 3
Fire Stations 56
Renovation
Payment for items of work covered under Division 9 of the plans and these specifications shall be based on the lump sum bid pricing identified in the Bid Schedule. No additional compensation will be allowed.
END OF SECTION
SECTION 09 2900
GYPSUM BOARD
City of Montebello 09 2900 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Walls and Ceilings.
2. Cementitious backer board.
3. Accessories.
1.2 RELATED SECTIONS
A. Related Sections:
1. Section 06 1000 – Rough Carpentry.
2. Section 07 1000 – Dampproofing.
3. Section 07 9200 – Joint Sealants.
4. Section 09 9100 – Painting.
1.3 REFERENCES
A. ASTM C1396 – 11 Standard Specifications for Gypsum Board.
B. ASTM C473 – 12 Standard Test Methods for Physical Testing of Gypsum Panel Products.
C. ASTM C1629 – Standard Classification for Abuse-Resistant Nondecorated Interior Gypsum Panel Products and Fiber-Reinforced Cement Panels.
1.4 PERFORMANCE REQUIREMENTS
A. Level 3 (highest) for hard- and soft-body impact when tested in accordance with ASTM C1629.
B. Average water absorption for panels is not greater than (5) percent by weight after a two-hour immersion when tested in accordance with ASTM C473.
1.5 SUBMITTALS
A. Submit under provisions of Section 01 3000 – Submittal Procedures.
B. Product Data: Manufacturer’s data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation methods.
1.6 QUALITY ASSURANCE
A. Quality Standards: GA-216 – Recommended Specifications for the Application and Finishing of Gypsum Board.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store products in manufacturer's unopened packaging until ready for installation.
SECTION 09 2900
GYPSUM BOARD
City of Montebello 09 2900 - 2
Fire Stations 56
Renovation
1.8 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Subject to compliance with project requirements, manufacturers offering items which may be incorporated in the Work include the following:
1. United States Gypsum Company.
2. National Gypsum Properties, LLC.
3. American Gypsum.
3. Or approved equal.
B. Requests for substitutions will be considered in accordance with provisions of Section 01 6000 – Product Requirements.
2.2 GYPSUM BOARD
A. Water-Resistant Gypsum Backing Board: ASTM C630; 5/8-inch-thick high impact resistant, ends cut square and finished smooth. 48-inch width, maximum permissible length; ends and edges straight and solid, edges tapered. Board consisting of a noncombustible water-resistant gypsum core, surfaced on face and back with water-repellent paper bonded to the core & face paper folded around long edges to reinforce and protect core, to be used at wet locations, see plans.
B. Impact Resistant Gypsum Board Type X (fire-resistant): 5/8” thick moisture and mold resistant with tapered edges; paper faced gypsum board with superior impact resistance & face paper folded around long edges to reinforce and protect core, ends cut square and finished smooth, typical at all locations. See plans for more info. Typical provide moisture resistant at wet locations.
2.3 ACCESSORIES
A. Corner Beads and Edge Trim: GA 201 and GA 216.
B. Joint Materials: Reinforcing tape and joint compound.
C. Fasteners: Type S12 screws.
PART 3 – EXECUTION
3.1 EXAMINATION
A. Section 01 7300 – Execution: Verification of existing conditions before starting work.
B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.
SECTION 09 2900
GYPSUM BOARD
City of Montebello 09 2900 - 3
Fire Stations 56
Renovation
C. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected and approved by Engineer.
D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.
3.2 INSTALLATION
A. Install in accordance with manufacturer’s instructions and as indicated on the Drawings.
B. Fasten gypsum board to furring or framing with screws.
C. Tape, fill, and sand joints.
3.3 JOINT TREATMENT AND FINISHING
*At completion of specified taping and finishing, install one coat of drywall primer as specified hereafter.
A. Levels: Install tape bedding compound, tape, and finishing cement on joints in wallboard as required for specified levels of finish.
B. Levels 2 through 5:
1. Install joint cement and finishing cement over screw heads. Treat all inside corners with joint cement, tape, and finishing cement. Treat outside corners with corner beads and finishing cement.
2. Provide metal casing beads at all edges of gypsum wallboard, which abut ceiling, wall, or column finish, and elsewhere as required, such as openings, offsets, etc. Install all exposed joints, trims, and attachments non-apparent following installation of paint or other finishes. If joints and fasteners are visibly apparent, correct defects as required.
3. Seal raw edges of plumbing openings and boards that have been cut to fit with sealing compound brushed on.
4. When entire installation is completed, correct and repair broken, dented, scratched or damaged wallboard before installation of finish materials by other trades.
C. Levels 3 and 4: Install one coat of drywall primer over entire surface prior to painting.
D. Level 5: Install one coat of skim coat over entire surface, followed by one coat of drywall primer over entire surface prior to painting.
3.4 REQUIRED LEVEL OF FINISH SCHEDULE
A. Level 4: Exposed painted wallboards in utility rooms, and similar spaces not requiring Level 5 finish.
1. Level 1, plus three (3) separate coats of compound at joints, angles, fasteners, and accessories. Compound shall be smooth and free of tool marks and ridges.
SECTION 09 2900
GYPSUM BOARD
City of Montebello 09 2900 - 4
Fire Stations 56
Renovation
B. Level 5: Exposed, painted wallboard in offices and corridors.
3.5 PROTECTION
A. Protect installed products until Substantial Completion.
B. Touch-up, repair or replace damaged products before Substantial Completion.
Payment for items of work covered under Division 9 of the plans and these specifications shall be based on the lump sum bid pricing identified in the Bid Schedule. No additional compensation will be allowed.
END OF SECTION
SECTION 09 3000
TILE
City of Montebello 09 3000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Tile and Accessories: Floor and Wall Glazed.
B. Related Sections:
1. Section 07 9200 - Joint Sealant.
1.2 REFERENCES
A. American National Standards Institute (ANSI):
1. ANSI A108.5, 1999 - Specifications for Ceramic Tile Installed with Dry-Set Portland Cement Mortar or Latex-Portland Cement Mortar.
2. ANSI A108.10, 1999 - Specifications for Installation of Grout in Tilework.
3. ANSI A118.1, 1999 - Standard Specification for Dry-Set Portland Cement Mortar.
4. ANSI A118.4, 1999 - Latex-Portland Cement Mortar.
5. ANSI A118.9, 1999 - Test Methods and Specifications for Cementitious Backer Units
6. ANSI A137.1, 1988 - Specifications for Ceramic Tile.
B. ASTM International (ASTM):
1. ASTM C 50 - Standard Specification for Portland Cement.
2. ASTM C 207 - Standard Specification for Hydrated Lime for Masonry Purposes.
3. ASTM C 847 - Standard Specification for Metal Lath.
C. Tile Council of North America (TCNA): TCA Handbook for Ceramic Tile Installation, 2007.
1.3 SUBMITTALS
A. Section 01 3300 – Submittal Procedures: Procedures for submittals.
1. Manufacturer's data sheets on each product to be used, including:
a. Preparation instructions and recommendations.
b. Storage and handling requirements and recommendations. c. Installation methods.
2. Shop Drawings: Indicate tile layout, patterns, color arrangement, perimeter conditions, junctions with dissimilar materials, control and expansion joints, thresholds, ceramic accessories, and setting details.
3. Manufacturer's Certificate:
a. Certify that products meet or exceed specified requirements. b. For each shipment, type and composition of tile provide a Master Grade Certificate signed by the manufacturer and the installer certifying that products meet or exceed the specified requirements of ANSI A137.1.
4. Maintenance Data: Include recommended cleaning methods, cleaning materials, stain removal methods, and polishes and waxes.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: Company experienced in performing the Work of this Section.
B. Single Source Responsibility: Obtain each type and color of tile from a single source. Obtain each type and color of mortar, adhesive and grout from the same source.
SECTION 09 3000
TILE
City of Montebello 09 3000 - 2
Fire Stations 56
Renovation
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver and store products in manufacturer's unopened packaging until ready for installation.
B. Protect adhesives and liquid additives from freezing or overheating in accordance with manufacturer's instructions.
C. Store tile and setting materials on elevated platforms, under cover and in a dry location and protect from contamination, dampness, freezing or overheating.
1.6 ENVIRONMENTAL REQUIREMENTS
A. Do not install adhesives in an unventilated environment.
B. Maintain ambient and substrate temperature of 50 degrees F during tiling and for a minimum of 7 days after completion.
1.7 EXTRA MATERIALS
A. Provide for Owner's use a minimum of 2 percent of the primary sizes and colors of tile specified, boxed and clearly labeled.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Subject to compliance with project requirements, manufacturers offering items which may be incorporated I the Work include the following:
1. Dal-Tile Corporation.
2. American Marazzi Tile, Inc.
3. Roca Tile Group.
4. Terrain
5. Or approved equal as provided in Section 01 6000 – Product Requirements.
2.2 TILE
A. General: Provide tile that complies with ANSI A137.1 for types, compositions and other characteristics indicated. Provide tile in the locations and of the types colors and pattern indicated on the Drawings and identified in the Schedule and the end of this Section. Tile shall also be provided in accordance with the following:
1. Factory Blending: For tile exhibiting color variations within the ranges selected under Submittal of samples, blend tile in the factory and package so tile taken from one package shows the same range of colors as those taken from other packages.
2. Mounting: For factory mounted tile, provide back or edge mounted tile assemblies as standard with the manufacturer, unless otherwise specified.
3. Factory Applied Temporary Protective Coatings: Where indicated under tile type, protect exposed surfaces of tile against adherence of mortar and grout by precoating with a continuous film of petroleum paraffin wax applied hot. Do not coat unexposed tile surfaces.
B. Floor unpolish Porcelain Tile or approved non-skid materials shall be used for restroom floor.:
1. Colors and size: As scheduled.
2. Trim Units: Matching cove base, cove base corner, bullnose, cove/inside finger cove, radius cap, sink rail in-corner/out-corner, outside cove corner shapes in sizes coordinated
SECTION 09 3000
TILE
City of Montebello 09 3000 - 3
Fire Stations 56
Renovation
with field tile.
3. Tile grout color as specified in drawings.
4. Material samples shall be provided for approval by appropriate City Staff.
C. Wall light polish Porcelain Tile shall be used for the wall surface.:
1. Colors and size: As scheduled.
2. Trim Units: Matching cove base, cove base corner, bullnose, cove/inside finger cove, radius cap, sink rail in-corner/out-corner, outside cove corner shapes in sizes coordinated with field tile.
3. Tile grout color as specified in drawings.
4. Material samples shall be provided for approval by appropriate City Staff.
D. See Color / Material Schedule on Drawings for size and color.
2.3 SETTING MATERlALS
A. Mortar Bed Materials:
1. Portland cement: ÅSTM C150, type 1, gray or white.
2. Hydrated Lime: ÅSTM C207, Type S.
3. Sand: ÅSTM C144, fine.
4. Latex additive: As approved.
5. Water: Clean and potable.
B. Grout:
1. Standard Grout: Cement grout, sanded or unsanded, as specified in ANSI A118.6; color as selected by Architect.
2. Polymer modified cement grout, sanded or unsanded, as specified in ANSI A118.7; color as selected by Architect.
C. Membrane at Walls:
1. 4 mil (0.1 mm) thick polyethylene film, ASTM D4397,ANSI A 118.10.
2. Reinforced asphalt paper.
D. Reinforcing Mesh: 2 by 2 inch (50 by 50 mm) size weave of 16/16 wire size; welded fabric, galvanized.
E. Cementitious Backing Units
1. ANSI A 118.9 or ASTM C 1325 (Type B).
2. 2” alkali – resistant glass fiber mesh type.
PART 2 EXECUTION
3.1 EXAMINATION
A. Section 01 7300 – Execution: Verification of existing conditions before starting work.
1. Verify that wall surfaces are free of substances which would impair bonding of setting materials, smooth and flat within tolerances specified in ANSI A137.1, and are ready to receive tile.
3.2 PREPARATION
A. Protect surrounding work from damage.
B. Remove any curing compounds or other contaminates.
SECTION 09 3000
TILE
City of Montebello 09 3000 - 4
Fire Stations 56
Renovation
C. Vacuum clean surfaces and damp clean.
D. Seal substrate surface cracks with filler. Level existing substrate surfaces to acceptable flatness tolerances.
E. Install cementitious backer board in accordance with ANSI A108.11 and board manufacturer's instructions. Tape joints and corners, cover with skim coat of dry-set mortar to a feather edge.
F. Prepare substrate surfaces for adhesive installation in accordance with adhesive manufacturer's instructions.
3.3 INSTALLATION - GENERAL
A. Install tile and grout in accordance with applicable requirements of ANSI A108.1 through A108.13, manufacturer's instructions, and TCA Handbook recommendations.
B. Lay tile to pattern indicated. Arrange pattern so that a full tile or joint is centered on each wall and that no tile less than 1/2 width is used. Do not interrupt tile pattern through openings.
C. Cut and fit tile to penetrations through tile, leaving sealant joint space. Form corners and bases neatly. Align floor joints.
D. Place tile joints uniform in width, subject to variance in tolerance allowed in tile size. Make joints watertight, without voids, cracks, excess mortar, or excess grout.
E. Form internal angles square and external angles bullnosed.
3.4 INSTALLATION - WALL & FLOOR TILE
A. Wall Tile: Over cementitious backer units on studs, install in accordance with TCA Handbook Method W244C-07, using membrane at toilet rooms.
B. Floor Tile: on cement mortar bed, install in accordance with TCA Handbook method F121-07 OR if existing slab is not depressed for a mortar bed install tile floor using the dry-set mortar, Later-Portland Cement Mortar, Epoxy of Furan Grout TSA method F115-07.
3.5 CLEANING
A. Clean tile and grout surfaces.
3.6 PROTECTION OF FINISHED WORK
A. Do not permit traffic over finished floor surface for 72 hours after installation.
B. Cover floors with kraft paper and protect from dirt and residue from other trades.
C. Where floor will be exposed for prolonged periods cover with plywood or other similar type walkways
Payment for items of work covered under Division 9 of the plans and these specifications shall be based on the lump sum bid pricing identified in the Bid Schedule. No additional compensation will be allowed.
END OF SECTION
SECTION 09 5113
ACOUSTICAL PANEL CEILING
City of Montebello 09 5113 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. The Contract Documents, as defined in Section 011000 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other documents.
1.2 SUMMARY
A. Section Includes:
1. Acoustical Ceiling Panels.
2. Exposed grid suspension system.
3. Suspended metal grid ceiling system (wire hangers, fasteners, main runners, cross tees, and wall angle moldings.
4. Perimeter trim.
B. Related Sections:
1. Section 02 4149 – Selective Structure Demolition
2. Section 09 2900 - Gypsum Board
3. Division 23 – Heating, Ventilation, and Air Conditioning
4. Division 26 - Electrical
1.3 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM C 635 - Specification for Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings.
2. ASTM C 636 - Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels.
3. ASTM E 84 Test Method for Surface Burning Characteristics of Building Materials.
4. ASTM E 580 - Specification for Application of Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels in Areas Requiring Seismic Restraint.
1.4 SYSTEM DESCRIPTION
A. Design Requirements: Rigidly secure acoustical ceiling system including integral mechanical and electrical components with maximum deflection of 1/360.
B. Continuous/Wall-to-Wall
1.5 SUBMITTALS
A. Section 01 3300 - Submittal Procedures: Procedures for Submittals.
1. Product Data: Metal grid suspension system components and acoustical panel units.
2. Shop Drawings: Indicate grid layout and related dimensioning, junctions with other work or ceiling finishes, interrelation of mechanical and electrical items related to system.
SECTION 09 5113
ACOUSTICAL PANEL CEILING
City of Montebello 09 5113 - 2
Fire Stations 56
Renovation
1.6 QUALITY ASSURANCE
A. Regulatory Requirements: Surface Burning Characteristics in Accordance with ASTM E 84 for Class III or C finish:
1. Flame Spread: Less than 200.
2. Smoke Density: Less than 450.
1.7 DELIVERY, STORAGE AND HANDLING
A. Deliver acoustical units in manufacturer's original unopened containers with brand name and type clearly marked.
B. Store under cover in dry, watertight conditions.
C. Prior to installation, store acoustical units for 24 hours minimum at same temperature and relative humidity as space where Work will be installed.
1.8 PROJECT CONDITIONS
A. Jobsite Requirements: Maintain uniform temperature range of 60-85 degrees F, and humidity of no more than 70 percent relative humidity prior to, during, and after installation.
1.9 ENVIRONMENTAL REQUIREMENTS
A. Resource Management:
1. Recycled Content:
a. Acoustical panels type ACT-1: Manufactured from minimum 20 percent recycled newsprint.
b. Suspension system: Manufactured from minimum 20 percent recycled steel.
1.10 MAINTENANCE
A. Extra Materials: Provide 1 box of extra acoustical panels for each panel type, pattern, and color to State Representative.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Suspension System: Subject to compliance with project requirements, manufacturers offering specified items which may be incorporated in the Work include the following:
1. Armstrong World Industries, Incorporated, Lancaster, PA (800) 448-1405.
2. Chicago Metallic Corporation, Chicago, IL (800) 323-7164.
3. USG Interiors, Chicago, IL (800) 950-3839.
4. Certainteed Ceilings (800) 346-7978
5. Or equal.
SECTION 09 5113
ACOUSTICAL PANEL CEILING
City of Montebello 09 5113 - 3
Fire Stations 56
Renovation
2.2 SUSPENSION SYSTEM
A. Components: All main beams and cross tees shall be commercial quality hot-dipped galvanized steel as per ASTM A 653. Main beams and cross tees are double-web steel construction with (9/16 inch) (15/16 inch) type exposed flange design. Exposed surfaces chemically cleansed, capping pre-finished galvanized steel in baked polyester paint. Main beams and cross tees shall have rotary stitching.
1. Structural Classification: ASTM C 635, Intermediate Duty.
2. Color: White and match the actual color of the selected ceiling tile, unless noted otherwise.
3. Acceptable Product: (Prelude XL 15/16” Exposed Tee) (Suprafine XL 9/16” Exposed Tee) (Interlude XL Dimensional Tee) as manufactured by Armstrong World Industries, Inc.
B. Attachment Devices: Size for five times design load indicated in ASTM C 635, Table 1, Direct Hung unless otherwise indicated.
C. Wire for Hangers and Ties: ASTM A 641, Class 1 zinc coating, soft temper, pre-stretched, with a yield stress load of at least time three design load, but not less than 12-gauge.
D. Edge Moldings and Trim: Metal or extruded aluminum of types and profiles indicated or, if not indicated, manufacturer’s standard moldings for edges and penetrations, including light fixtures, that fit type of edge detail and suspension system indicated. Provide moldings with exposed flange of the same width as exposed runner.
E. Accessories
2.3 ACOUSTICAL PANELS
A. ACT-1:
1. Acoustical Ceiling Panels Type ACP:
a. Panel Name: Armstrong Calla & Ultima 1912, USG Mars ClimaPlus 88785, CertainTeed Symphony M #1220BB-75-1, or equal.
b. Panel Size: 24 in x 48 in.
c. Panel Thickness: 3/4 inch.
d. Edge Detail: Angled Tegular.
e. Light Reflectance: 0.85 minimum, in accordance with ASTM E1477. f. CAC: Minimum 45, UL Classified, complying with ASTM E1414. g. NRC: Minimum 0.70, UL Classified, complying with ASTM C423. h. Color: White.
i. Recycled Content: up to 56% total recycled content.
SECTION 09 5113
ACOUSTICAL PANEL CEILING
City of Montebello 09 5113 - 4
Fire Stations 56
Renovation
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.
1. Verify that layout of hangers will not interfere with other Work.
B. Report in writing to State Representative prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected.
C. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the United States Postal Service.
3.2 INSTALLATION - SUSPENSION SYSTEM
A. Install system in accordance with ASTM C 636 and manufacturer's published instructions.
B. Provide metal hanger tabs and clips attached to metal deck where required for attachment of suspension wires.
C. Hang system independent of walls, columns, ducts, pipes and conduit. Where carrying members are spliced, avoid visible displacement of face plane of adjacent members. Where ducts or other equipment prevent regular spacing of hangers, reinforce nearest affected hangers and related carrying channels to span extra distance.
D. Locate system to match the demoed existing to Reflected Ceiling Plan.
E. Do not support components on main runners or cross runners if weight causes total dead load to exceed deflection capability. Do not eccentrically load system, or produce rotation of runners.
F. Install edge molding at intersection of ceiling and vertical surfaces using longest practical lengths.
Miter corners. Provide edge moldings at junctions with other interruptions. Secure at 16 inches (41 cm) on center.
G. Install hold-down clips within five feet of doors.
H. Rivet cross tee's at 4 feet on center to edge mold.
I. Install compression struts and secure system with tie wires as required to tie into existing.
1. Provide hanger wires, splayed 45 degrees, within 3 inches of intersection between main runner and cross runner as required to tie into existing system.
2. Provide compression strut and splayed hanger wires as follows:
a. One assembly for each light fixture.
b. Located within 6 feet of wall.
c. Located at maximum 12 feet on center or as indicated on Drawings.
3.3 INSTALLATION - ACOUSTICAL PANELS
A. Fit acoustic units in place free from damaged edges or other defects. Install acoustic units level, in uniform plane, and free from twist, warp, and dents.
SECTION 09 5113
ACOUSTICAL PANEL CEILING
City of Montebello 09 5113 - 5
Fire Stations 56
Renovation
3.4 CONSTRUCTION
A. Interface with Other Work:
1. Schedule installation of acoustic units after interior wet work is completed.
2. Install after major above ceiling work is complete.
3. Coordinate location of hangers with other Work.
B. Site Tolerances:
1. Variation from Flat and Level Surface: 1/8 inch in 12 feet.
3.5 FIELD QUALITY CONTROL
A. Inspect acoustical panel placement, ceiling grid suspension system installation and connection to structure.
3.6 CLEANING
A. Clean exposed surfaces of acoustical ceilings including trim, edge moldings, and suspension system members.
END OF SECTION
SECTION 09 6513
RUBBER BASE
City of Montebello 0 9 6513 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Topset coved rubber base for installation with surface flooring.
B. Related Requirements:
1. Division 01 - General Requirements.
2. Section 03 3543 - Concrete Polish.
3. Section 09 3000 - Ceramic Tile.
4. Section 09 6518 - Rubber Flooring.
2. Section 09 6519 - Vinyl Composition Tile.
1.2 SUBMITTALS
A. Product Data: Submit manufacturer’s published technical data describing materials, construction and recommended installation instructions. Submit technical data and installation instructions for each adhesive material.
B. Maintenance Instructions: Submit manufacturer’s recommendations for maintenance, care and cleaning of base.
C. Samples: Submit Samples of top set base in each available color. Following color selections, submit Samples, not less than 12 inches long of each selected color and type.
Submit pint cans of each type adhesive.
D. Maintenance Materials: Before Substantial Completion, deliver at least 50 lineal feet and five outside corner units of each color of rubber base installed. Deliver the materials in unopened factory containers or in sealed cartons with labels identifying the contents, matching installed materials. Include unopened cans of adhesives adequate to install the maintenance materials.
1.3 QUALITY ASSURANCE
A. Qualifications of Installer: Minimum five years of experience in successfully installing the same or similar flooring materials.
B. Comply with the following as a minimum requirement:
1. ASTM E84: Standard Test Method for Surface Burning Characteristics of Building Materials.
2. ASTM F1861: Standard Specification for Resilient Wall Base.
3. Comply with current CHPS requirements, www.chps.net.
4. Chemically based products such as sealers, primers, fillers, adhesives, etc. must be approved by Owner’s Office of Environmental Health and Safety (OEHS).
5. Each selected color and configuration shall be from same dye lot and color.
1.4 DELIVERY, STORAGE AND HANDLING
A. Materials shall be delivered to the Project site in original unopened manufacturer’s packaging clearly labeled with manufacturer’s name. Store materials at room temperature, but not less than 70 degrees F, for a minimum of 48 hours before installation, unless otherwise indicated in manufacturer’s printed instructions.
SECTION 09 6513
RUBBER BASE
City of Montebello 0 9 6513 - 2
Fire Stations 56
Renovation
1.5 PROJECT CONDITIONS
A. Ventilation and Temperature: Verify areas that are to receive rubber base are ventilated to remove fumes from installation materials, and areas are within temperature range recommended by the various material manufactures for site installation conditions.
1.6 WARRANTY
A. Manufacturer shall provide a five-year material warranty.
B. Installer shall provide a two-year fabrication and installation warranty.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Burke/Mercer Wall Base.
B. Roppe, Pinnacle Rubber Base.
C. Flexco Company, Wallflower Premium Rubber Wall Base.
D. Johnsonite.
E. Equal.
2.2 MATERIALS
A. Rubber base: Conform to ASTM F 861; Group 2, solid (homogeneous); Type 1, TS, (thermoset) vulcanized rubber, Style A, Size 4-inch high unless otherwise indicated & roll type, integral colors as selected, non-shrinking, 1/8 inch thick, with matching molded outside corners.
B. Rubber Corner Blocks & Micro Corners; same manufacture.
B. Base Adhesive: Water based, low odor type, as recommended by manufacturer of rubber base.
PART 3 – EXECUTION
3.1 COORDINATION
A. Coordinate the Work of this section with other sections to provide a level, smooth and clean finish surfaces to receive rubber base.
3.2 EXAMINATION
A. Field verify dimensions and other conditions affecting the Work of this section before commencing the Work of this section.
B. Before Work is started, examine surfaces that are to receive rubber base. Deficiencies shall be corrected before starting the Work of this section.
SECTION 09 6513
RUBBER BASE
City of Montebello 0 9 6513 - 3
Fire Stations 56
Renovation
3.3 PREPARATION
A. Do not start preparation until adjacent concrete floor slabs are at least 90 days old and finish flooring is installed.
B. Install rubber base when ambient temperature is 70 degrees F. or higher.
3.4 INSTALLATION
A. Install top set base at hard floors, including resilient flooring, concrete and wood, carpet and other soft floors.
B. Securely fasten cement base to backing in long lengths in accordance with manufacturer’s recommendations. Lay out lengths so that not less than 18 inches long filler pieces are provided. Assure that top and toe continuously contact the wall and floor, and that all joints are tight. Install matching factory formed external corners at all offsets. Inside corners shall be coped; wrapped corners are not acceptable.
C. Use of adhesive gun is prohibited. Apply adhesive directly to substrate using the appropriate notched trowel or spreader according to manufacturer’s instructions. Maintain 1/8-inch gap from top of base to prevent adhesive oozing onto adjacent surfaces.
D. Base and outside corners shall be rolled with a seam roller before adhesive sets.
3.5 CLEANING
A. Maintain surfaces of base clean as installation progresses. Clean rubber base when sufficiently seated and remove foreign substances.
B. Clean adjacent surfaces of adhesive or other defacement. Replace damaged and/or defective Work to the specified condition.
3.6 CLEAN UP
A. Remove rubbish, debris and waste materials and legally dispose of off the Project site.
3.7 PROTECTION
A. Protect the Work of this section until Substantial Completion.
END OF SECTION
SECTION 09 9123
INTERIOR PAINTING
City of Montebello 09 9123 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes surface preparation and the application of paint systems on the following interior substrates listed in 3.6 Interior Painting Schedule.
B. Related Requirements:
1. Section 051200 "Structural Steel Framing" for shop priming of metal substrates with primers specified in this Section.
2. Section 099300 "Staining and Transparent Finishing" for surface preparation and the application of wood stains and transparent finishes on interior wood substrates.
3. Section 099600 "High-Performance Coatings" for high-performance and special-use coatings.
1.3 DEFINITIONS
A. Gloss Level 1: Not more than 5 units at 60 degrees and 1 to 2 units at 85 degrees.
B. Gloss Level 2: 5 to 9 units at 60 degrees and 10 to 15 units at 85 degrees.
C. Gloss Level 3: 10 to 15 units at 60 degrees and 15 to 30 units at 85 degrees.
D. Gloss Level 4: 20 to 35 units at 60 degrees and 35 to 50 units at 85 degrees.
E. Gloss Level 5: 40 to 50 units at 60 degrees.
F. Gloss Level 6: 70 to 80 units at 60 degrees.
G. Gloss Level 7: More than 80 units at 60 degrees.
H. Blocking: Two painted surfaces sticking together such as a painted door sticking to a painted jamb.
I. Mildew Resistant: Certified products are specially formulated with microbicidal additives that resist mold, mildew, and algae growth on the paint film and inhibit growth of bacterial odors.
J. CHPS: Collaborative for High Performance Schools. A national movement to improve student performance and the entire educational experience by building the best possible schools. www.chps.net.
K. EG: Ethylene Glycol. Ethylene glycol is listed as a hazardous air pollutant (HAP) by the U.S.
EPA.
SECTION 09 9123
INTERIOR PAINTING
City of Montebello 09 9123 - 2
Fire Stations 56
Renovation
L. PDCA: Painting & Decorating Contractors of America www.pdca.org .
M. RAVOC: Reactivity adjusted VOC. "Reactivity" means the ability of a VOC to promote ozone formation
N. SSPC: The Society for Protective Coatings publishes Scopes of SSPC Surface Preparation Standards and Specifications www.sspc.org .
O. Dunn-Edwards Conformance Chart: D-E CONFORMANCE TABLE
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions.
B. LEED v.4 Requirements: Interior paints and coatings must pass CDPH Standard Method V1.1 (also called section 01350) emissions testing; and they must comply with the VOC content limits of the California ARB 2007 Suggested Control Measure for Architectural Coatings.
C. Samples for Initial Selection: For each type of topcoat product.
D. Samples for Verification: For each type of paint system and in each color and gloss of topcoat.
1. Submit Samples on rigid backing, no smaller than 7 inches X 10 inches (177 mm X 254 mm) or larger than 8.5 inches X 11 inches (216 mm X 280 mm).
2. Label each Sample for project, architect, general contractor, painting contractor, paint color name and number, paint brand name, "P" number if applicable, and application area.
E. Product List: For each product indicated, include the following:
1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.
2. VOC content.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Paint: Provide not less than 1 gal. (3.8L) of each material and color applied.
1.6 QUALITY ASSURANCE
A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Architect will select one surface to represent surfaces and conditions for application of each paint system specified in Part 3.
a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft. (9 sq. m). b. Other Items: Architect will designate items or areas required.
SECTION 09 9123
INTERIOR PAINTING
City of Montebello 09 9123 - 3
Fire Stations 56
Renovation
2. Final approval of color selections will be based on mockups. a. If preliminary color selections are not approved, apply additional mockups of additional colors selected by Architect at no added cost to Owner.
3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.
4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F (7 deg C).
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.8 FIELD CONDITIONS
A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 90 degrees F (10 and 32 degrees C).
B. Do not apply paints when relative humidity exceeds 85 percent; at temperatures less than 5 degrees F (3 degrees C) above the dew point; or to damp or wet surfaces.
C. Painting contractor should follow proper painting practices and exercise judgment based on his or her experience and project specific conditions as to when to proceed.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
Basis-of-Design Product: Section herein are based on products manufactured or distributed by the Dunn- Edwards Corporation
www.dunnedwards.com and are the basis of design against which the Architect will judge equivalency. The quantity of titanium dioxide, the use of clays, aluminum silicate, talc and the purity of acrylic materials are a few of the criteria which will be used by the Architect in determining equivalency of materials.
A. See lists of products currently approved by MPI in its "MPI Approved Products List," www.paintinfo.com.
2.2 PAINT, GENERAL
A. Material Compatibility:
1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
SECTION 09 9123
INTERIOR PAINTING
City of Montebello 09 9123 - 4
Fire Stations 56
Renovation
2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.
B. VOC Content: Provide material that comply with VOC limits of authorities having jurisdiction.
C. Colorants: The use of colorants containing hazardous chemicals, such as ethylene glycol, is prohibited and zero VOC colorants should be used whenever possible.
D. Colors: As selected by the Architect.
1. Indicate a percentage of surface area which will be painted with deep tones.
2.3 SOURCE QUALITY CONTROL
A. Testing of Paint Materials: Owner reserves the right to invoke the following procedure:
1. Owner may engage the services of a qualified testing agency to sample paint materials.
Contractor will be notified in advance and may be present when samples are taken. If paint materials have already been delivered to Project site, samples may be taken at Project site. Samples will be identified, sealed, and certified by testing agency.
2. Testing agency will perform tests for compliance with product requirements.
3. Owner may direct Contractor to stop applying coatings if test results show materials being used do not comply with product requirements. Contractor shall remove noncomplying paint materials from Project site, pay for testing, and repaint surfaces painted with rejected materials. Contractor will comply with requirements to use compatible products and systems as described in Article 2.2. Contractor will be required to remove rejected materials from previously painted surfaces if, on repainting with complying materials, the two paints are incompatible.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
1. Concrete: 12 percent.
2. Masonry (Clay and CMU): 12 percent.
3. Wood: 15 percent.
4. Gypsum Board: 12 percent.
5. Plaster: 12 percent.
C. Gypsum Board Substrates: Verify that finishing compound is sanded smooth.
D. Plaster Substrates: Verify that plaster is fully cured, including pH testing to determine that alkalinity is within limits established by the manufacturer.
E. Spray-Textured Ceiling Substrates: Verify that surfaces are dry.
SECTION 09 9123
INTERIOR PAINTING
City of Montebello 09 9123 - 5
Fire Stations 56
Renovation
F. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
G. Proceed with coating application only after unsatisfactory conditions have been corrected.
1. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Comply with manufacturer's written instructions.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.
C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and re-prime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.
D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces to be painted exceeds that permitted in manufacturer's written instructions, including pH testing to determine that alkalinity is within limits established by the manufacturer.
E. Masonry Substrates: Remove efflorescence and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces or mortar joints exceed that permitted in manufacturer's written instructions.
F. Steel Substrates: Remove rust, loose mill scale, and shop primer, if any. Clean using methods recommended in writing by paint manufacturer.
G. Shop Primed Steel Substrates: Clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop primed surfaces.
H. Galvanized Metal Substrates: Remove grease and oil residue from galvanized sheet metal fabricated from coil stock to produce clean, lightly etched surfaces that promote adhesion of subsequently applied paints.
I. Aluminum Substrates: Remove loose surface oxidation.
J. Wood Substrates:
1. Scrape and clean knots and apply coat of knot sealer before applying primer.
2. Sand surfaces that will be exposed to view and dust off.
3. Prime edges, ends, faces, undersides, and backsides of wood.
4. After priming, fill holes and imperfections in the finish surfaces with putty or plastic wood filler. Sand smooth when dried.
SECTION 09 9123
INTERIOR PAINTING
City of Montebello 09 9123 - 6
Fire Stations 56
Renovation
K. Cotton or Canvas Insulation Covering Substrates: Remove dust, dirt, and other foreign material that might impair bond of paints to substrates.
3.3 APPLICATION
A. Apply paints according to manufacturer's written instructions.
1. Use applicators and techniques suited for paint and substrate indicated.
2. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces.
Before final installation, paint surfaces behind permanently fixed equipment or furniture with prime coat only.
3. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.
4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.
B. Tint each undercoat to a lighter shade of the finish coat (not to exceed 2 ounces of colorant) to facilitate identification of each coat if multiple coats of same material are to be applied.
C. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
E. Block Fillers: Provide block fill as scheduled to conform to the following PDCA Standard P12-05:
1. Level 3 - Premium Fill: One or multiple coats of high-performance block filler manufactured to be applied at a high dry film build. Block filler shall be back-rolled to eliminate voids and reduce the majority of the masonry profile depth.
F. Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security Work:
1. Paint the following work where exposed in equipment rooms:
a. Equipment, including panelboards and switch gear.
b. Uninsulated metal piping.
c. Uninsulated plastic piping.
d. Pipe hangers and supports.
e. Metal conduit.
f. Plastic conduit.
g. Tanks that do not have factory-applied final finishes. h. Duct, equipment, and pipe insulation having cotton or canvas insulation covering or other paintable jacket material.
i. Other items as directed by the architect.
2. Paint the following work where exposed in occupied spaces:
a. Equipment, including panelboards.
b. Uninsulated metal piping.
SECTION 09 9123
INTERIOR PAINTING
City of Montebello 09 9123 - 7
Fire Stations 56
Renovation
c. Uninsulated plastic piping.
d. Pipe hangers and supports.
e. Metal conduit.
f. Plastic conduit.
g. Duct, equipment, and pipe insulation having cotton or canvas insulation covering or other paintable jacket material.
h. Other items as directed by the Architect.
3. Paint portions of internal surfaces of metal ducts, without liner, behind air inlets and outlets that are visible from occupied spaces.
3.4 FIELD QUALITY CONTROL
A. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting agency to inspect and test paint for dry film thickness.
1. Contractor shall touch up and restore painted surfaces damaged by testing.
2. If test results show that dry film thickness of applied paint does not comply with paint manufacturer's written recommendations, Contractor shall pay for testing and apply additional coats as needed to provide dry film thickness that complies with paint manufacturer's written recommendations.
3.5 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
3.6 INTERIOR PAINTING SCHEDULE
A. Gypsum Board Substrates:
1. Premium Low Odor / Zero VOC Latex System:
a. Prime Coat: Primer sealer, latex, interior, Dunn-Edwards, Vinylastic Select VNSL00.
b. Intermediate Coat: Latex, interior, matching topcoat c. Topcoat: Latex, interior, semi-gloss, Dunn-Edwards, Spartawall SWLL50, (Gloss
Level 5).
SECTION 09 9123
INTERIOR PAINTING
City of Montebello 09 9123 - 8
Fire Stations 56
Renovation
B. Ferrous Metal Substrates:
1. Premium Low Odor / Zero VOC Latex over a Waterborne Alkyd Primer System:
a. Prime Coat: Primer, alkyd, anti-corrosive, for metal, Dunn-Edwards, Bloc-Rust Premium BRPR00 Series or Enduraprime rust preventative primer ENPR00. b. Intermediate Coat: Latex, interior, matching topcoat. c. Topcoat: Latex, interior, semi-gloss, Dunn-Edwards, Spartawall SWLL50, (Gloss
Level 5).
C. Non-Ferrous Metal Substrates:
1. Premium Low Odor / Zero VOC Latex System:
a. Pre-Treatment: Waterbased, Krud Kutter, Metal Clean & Etch SCME-01 b. Prime Coat: Primer, waterbased, Dunn-Edwards, Ultrashield Galvanized Metal Primer ULGM00.
c. Intermediate Coat: Latex, interior, matching topcoat. d. Topcoat: Latex, interior, semi-gloss, Dunn-Edwards, Spartawall SWLL50, (Gloss
Level 5).“
D. Wood Substrates:
1. Waterborne Urethane Alkyd Enamel over a Latex Primer System:
a. Prime Coat: Primer, acrylic, for interior wood, Dunn-Edwards, Ultra-Grip UGPR00. b. Intermediate Coat: Waterborne urethane alkyd matching topcoat. c. Topcoat: Waterborne urethane alkyd, interior/exterior, high gloss, Dunn-Edwards, Aristoshield
ASHL70, (Gloss Level 7).
END OF SECTION
SECTION 10 1414
SIGNAGE
City of Montebello 10 1400 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Supply and installation of Interior Room Signs, and Geometric Signs.
B. Related Sections:
1. Project Signs, see Construction Facilities and Temporary Controls:
Section 01 5000.
2. Division 09: Finishes
1.2 SUBMITTALS
A. Make submittals in accordance with Division 1.
B. Shop Drawings: Submit shop drawings showing sizes of signs and lettering, construction details of signs and anchoring details.
C. Submittals: Submit color and texture samples of all materials to be used for signs.
D. Samples: Submit 1 full size sample of each toilet room signs.
1.3 QUALITY ASSURANCE
A. Manufacturers shall have been regularly engaged in manufacturing identifying devices for minimum of 5 years.
B. Provide signs from one manufacturer.
1.4 PRODUCT HANDLING
A. Use all means necessary to protect signs before, during and after installation. In event of damage, immediately make necessary repairs and replacements.
PART 2 - PRODUCTS
2.1 MANUFACTURE
A. Products of following manufacturers are acceptabl e and are the basis for intended design and quality.
1. Vomar Products Inc.
2. ASI-Modulex, Inc.
3. Mohawk Sign Systems, Inc.
4. Accent Signage Systems.
5. The Gruenke Company.
6. Ada Sign Products.
7. AccuBraille.
8. Equal.
2.2 MATERIALS AND FABRICATION
SECTION 10 1400
SIGNAGE
City of Montebello 10 1400 - 2
Fire Stations 56
Renovation
A. Interior Sign Materials:
1. Substrate Panel: 1/8 inch minimum thick, integrall y colored or clear acrylic plastic, or laminated acrylic. Conforming to ASTM D4802; non-glare (matte), UV stable, suitable for interior and exterior use.
a. Corners shall be radius.
b. Edges shall be square and eased.
c. Colors as selected by ARCHITECT from manufacturer’s custom color range.
1. Fasteners:
a. Stainless steel tamper-proof screws and plastic a nchors. b. Signs mounted on fire-rated doors shall be secure d with adhesive. c. Adhesives and sealants shall comply with the limi ts for VOC content.
B. Characters and Symbols: Shall be fabricated by one of the processes described below:
1. Computer cut raised characters and graphics shall be cut from 1/16 inch integrally colored acrylic. Raised characters and graphics shall be inlaid 1/32 inch minimum into first surface of sign background, secured with adhesive so it cannot be removed without the use of tools. Raised characters and graphics shall have beveled, eased or rounded edges. Non-tactile text and graphics shall be applied to the second surface, and background color shall be applied to the second surface and protected with film or an additional backplate. Pictograms and other symbols including the International Symbol of Accessibility, which are included on signs with raised characters and Braille, are not required to be raised.
2. Raised characters and graphics including braille shall be integral to sign face and shall be formed into sign face by high pressure thermofor ming using a negative mold. No applied, glued, welded tactile elements are acceptable. Raised characters and graphics shall have beveled, eased or rounded edges. No sharp, square edges are acceptable.
Non-tactile text and graphics shall be applied to t he second surface, and background color shall be applied to the second surface and pr otected with vinyl film. Pictograms and other symbols including the International Symbo l of Accessibility, which are included on signs with raised characters and Braille, or other signs are not required to be raised.
2.3 COMMUNICATION ELEMENTS AND FEATURES
A. Raised Characters shall comply with CBC 11B-703.2 and shall be duplicated in Braille complying with Section 11B-703.3.
1. Character Type: Characters on signs shall be rai sed 1/32 inch minimum above their background and shall be sans serif uppercase charac ters duplicated in Braille.
Characters and Braille shall be in a horizontal format.
2. Character Height: Character height measured vert ically from the baseline of the character shall be 5/8 inch minimum and 2-inch maxi mum based on the height of the uppercase letter “I”.
3. Character Proportions: Characters shall be select ed from fonts where the width of the uppercase letter “O” is 60 percent minimum and 110 percent maximum of the height of the letter “I”.
SECTION 10 1400
SIGNAGE
City of Montebello 10 1400 - 3
Fire Stations 56
Renovation
4. Stroke Thickness: Stroke thickness of the upperca se letter “I” shall be 15 percent maximum of the height of the character.
5. Character and Line Spacing shall be in conformanc e to CBC 11B-703.2.7 and 11B- 703.2.8.
6. Character Placement: Shall be placed in accordan ce to Section 2.3, F (2) below.
B. Braille: Contracted Grade 2 Braille, conforming to CBC 1 1B-703.3. Braille characters shall be inlaid optically correct acrylic Raster beads into computer drilled holes in the panel surface.
1. Dimensions and Capitalization: Braille dots shall have a domed or rounded shape and shall comply with CBC Table 11B-703.3.1. The indica tion of an uppercase letter or letters shall only be used before the first word of sentences, proper nouns and names, individual letters of the alphabet, initials, and acronyms.
2. Position: Braille shall be positioned below the corresponding text in a horizontal format, flush left or centered. If text is multi-lined, Braille shall be placed below the entire line of text. Braille shall be separated 3/8 inch minimum a nd 1/2 maximum from any other tactile characters and 3/8 inch minimum from raised borders and decorative elements.
C. Pictograms: In conformance to CBC 11B-703.6. Pictograms shall have a field height of 6 inches minimum. Characters and Braille shall not be located in the pictogram field.
1. Pictogram field: Pictogram shall provide a field height of 6-inches minimum.
Characters and Braille shall not be located in the pictogram field.
2. Finish and Contrast: Pictograms and their field shall have a non-glare finish.
Pictograms shall contrast with their field with either a light pictogram on a dark field or a dark pictogram on a light field.
3. Text Descriptors: Pictograms shall have text descriptors located directly below the pictogram field, and shall comply with CBC 11B-703.2, 11B-703.3 and 11B-703.4.
D. International Symbol of Accessibility (ISA): Shall comply with CBC 11B-703.7 and CBC Figure 11B-703.7.2.1. The ISA shall consist of a white figure on a blue background. The blue color shall be approximate to FS. 15090 in Federal Standard 595C.
E. Mounting Locations and Height: Signs with tactile characters shall be as indicated on the drawings and in conformance to CBC 11B-703.4.
1. Mounting Locations:
a. Identification signs for rooms and spaces shall b e located on the wall adjacent to the latch side of the door, as one enters the room or space. b. Signs containing tactile characters shall be loca ted so that a clear floor space 18-inches minimum by 18-inches minimum, centered on the tactile characters, is provided beyond the arc of any door swing between the closed position and 45-degree open position.
c. Where a tactile sign is provided at a door, the s ign shall be located alongside the door at the latch side.
d. Where there is no wall space at the latch side of a single door, signs shall be located on the nearest adjacent wall.
2. Mounting height above finish floor or ground: Tac tile characters on signs shall be located 48 inches minimum above the finish floor or ground surface, measured from
SECTION 10 1400
SIGNAGE
City of Montebello 10 1400 - 4
Fire Stations 56
Renovation
the baseline of the lowest Braille cells and 60 inches maximum above the finish floor or ground surface, measured from the baseline of the highest line of raised characters.
2.4 RESTROOM SIGNAGE
A. Restrooms shall be provided with wall mounted pictograms with text descriptors.
B. Room Identification for Restrooms: Provide a 6-inch-wide by 9-inch-tall room identification sign, including a pictogram of the International Symbol of Accessibility on a side. Restroom name shall be “UNISEX”. Characters, Braille, pictograms and mounting locations and height shall be in conformance to section 2.3.
2.5 PARKING SIGNS
A. Tow-Away Sign: 18 inches by 24 inches with rounde d corners. Black graphics on white background, with lettering not less than 1 inch high. Provide contact info prior to installing of signage. Sign to read:
“UNAUTHORIZED VEHICLES PARKED IN DESIGNATED ACCESSI BLE SPACES NOT
DISPLAYING DISTINGUISHING PLACARDS OR SPECIAL LICEN SE PLATES ISSUED FOR PERSONS WITH DISABILITIES WILL BE TOWED AWAY AT THE OWNER’S EXPENSE. TOWED VEHICLES MAY BE RECLAIMED AT [Provide info] OR BY TELEPHONING [Provide info].
B. Parking Space Identification Sign: 12-inch by 18- inch with rounded corners. White reflectorized graphic on dark blue background, and shall display an 8-inch high International Symbol of Accessibility per paragraph 2.03.E.
1. Additional language or an additional sign below t he International Symbol of Accessibility shall state I “Minimum Fine $250”.
2. Signs identifying van accessible parking spaces s hall contain additional language or an additional sign with the designation “Van Accessible”.
C. Signs shall be mounted on posts at head of each a ccessible parking with lower edge 80 inches minimum above ground surface, or mounted on walls at a minimum height of 60 inches from ground surface.
D. Headroom Signs: On parking structures provide signs indicating headroom clearance height at entries and at any point of a vehicular path where entry clearance height is reduced. Minimum character height shall be 3 inches.
PART 3 – EXECUTION
3.1 EXAMINATION
A. Verify that surfaces are ready to receive work.
B. Beginning of installation means installer accepts condition of existing surfaces.
3.2 INSTALLATION
A. Interior Identification Signs:
1. Anchor signs to wall using 4 tamperproof, round head screws, one at each corner of sign. Furnish plastic anchors.
SECTION 10 1400
SIGNAGE
City of Montebello 10 1400 - 5
Fire Stations 56
Renovation
2. In In addition to screws, signs shall be secured to wall with high-bond two-faced tape.
3. For installation on glass, fasten sign to glass w ith very high bond double faced tape. On opposite side of glass, anchor matching backplate to glass with very high- bond double-faced tape.
B. Geometric Signs: Toilet room signs shall be anchored to doors with 3 tamperproof countersunk screws, designed for anchoring to material of wall.
3.3 CLEANUP
A. Remove rubbish, debris, and waste materials and legally dispose of off Project site.
3.4 PROTECTION
A. Protect Work of this section until Substantial Completion.
Payment for items of work covered under Division 10 of the plans and these specifications shall be based on the lump sum bid pricing identified in the Bid Schedule. No additional compensation will be allowed.
END OF SECTION
SECTION 10 2813
TOILET ACCESSORIES
City of Montebello 10 2813 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Toilet Accessories.
2. Attachment hardware.
B. Related Documents: The Contract Documents, as defined in Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other documents.
C. Related Sections:
1. Section 06 1000 - Rough Carpentry: Placement of backing and blocking for attachment of accessories.
1.2 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM A 123 - Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products.
2. ASTM A 167 - Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip.
3. ASTM A 366 - Specification for Steel, Carbon, Cold-Rolled Sheet, Commercial Quality.
1.3 SUBMITTALS
A. Division 1 - Submittal Procedures: Procedures for submittals.
1. Product Data: Data for each accessory describing size, finish, details of function, and attachment methods.
1.4 QUALITY ASSURANCE
A. Regulatory Requirements: Conform to California Building Code, 2010 Edition and Federal ADA for mounting heights and locations of accessories.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Section 01 6000 - Product Requirements: Transport, handle, store, and protect products.
B. Deliver accessories in original labeled packaging, bearing manufacturer's name and type of accessory.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
SECTION 10 2813
TOILET ACCESSORIES
City of Montebello 10 2813 - 2
Fire Stations 56
Renovation
A. Subject to compliance with project requirements, manufacturers offering specified items which may be incorporated in the Work include the following:
1. Bobrick Washroom Equipment,
2. Or approval equal as permitted in Section 01 6000 - Product Requirements: Product options and substitutions.
B. Product numbers listed on the drawings are those of Bobrick. If one of another manufacturers is to be supplied the quality and design shall equal or exceed that of Bobrick.
2.2 MATERIALS
A. Sheet Steel: ASTM A 366.
B. Galvanized Sheet Steel: ASTM A 366, ASTM A 123 to 1.25 ounces per square yard.
C. Stainless Steel Sheet: ASTM A167, Type 304.
D. Fasteners, Screws, and Bolts: Hot dip galvanized, tamper-proof.
E. Expansion Shields: Fiber, lead, or rubber as recommended by accessory manufacturer for component and substrate.
2.3 MANUFACTURED UNITS – See Drawings
2.4 FABRICATION
A. Weld and grind smooth joints of fabricated components.
B. Form exposed surfaces from single sheet of stock, free of joints. Form surfaces flat without distortion. Maintain surfaces without scratches or dents.
C. Fabricate grab bars of tubing, free of visible joints, return to wall with end attachment flanges.
D. Shop assemble components and package complete with anchors and fittings.
E. Provide steel anchor plates, adapters, and anchor components for installation.
F. Back paint components where contact is made with building finishes to prevent electrolysis.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 7000 – Execution and Closeout Requirements: Verification of existing conditions before starting work.
B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.
1. Verify correct location of opening in wall for recessed accessories.
2. Verify that attachment blocking and backing plates are in place in the correct location for accessory connections.
SECTION 10 2813
TOILET ACCESSORIES
City of Montebello 10 2813 - 3
Fire Stations 56
Renovation
C. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected and approved by the Engineer.
D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.
3.2 PREPARATION
A. Deliver inserts and rough-in frames to site for scheduled installation.
B. Provide and use templates and rough-in measurements as required.
3.3 INSTALLATION
A. Install fixtures, accessories, and items in accordance with manufacturer's instructions, and as indicated on Drawings. Use tamper-proof fasteners.
B. Install plumb and level, securely and rigidly anchored to substrate.
3.4 ADJUSTING AND CLEANING
A. Adjust accessories for proper operation and verify mechanisms function smoothly.
B. Remove temporary labels and protective coatings. Clean and polish exposed surfaces.
END OF SECTION
SECTION 22 0500
PLUMBING
City of Montebello 22 0500 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Waterproofing.
2. Electrical Connections and Protection.
3. Supports and anchors.
4. Cleaning, Protection and Adjustment.
5. Dielectric Fittings.
6. Piping connections.
7. Mechanical Identification.
8. Sleeves and Seals.
B. Related Documents: The Contract Documents, as defined in Section 01 10 00 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents.
C. Related Sections:
1. 07 9200 - Joint Sealants: Sealants.
2. 09 9123 – Interior Painting: Field painting.
1.2 WATERPROOFING
A. Where work penetrates waterproofing, including waterproof concrete, the method of installation shall be approved by the Engineer prior to performing the work. Furnish necessary sleeves, caulking and flashing required to make openings absolutely watertight.
1.3 ELECTRICAL CONNECTIONS AND PROTECTION
A. Regardless of voltage, provide control wiring, interlock wiring, and equipment control wiring for the equipment provided under this division of the specifications.
B. Furnish electrical disconnect switches, starters and combination starter disconnects required for equipment provided under this division of the specifications. Circuit breakers furnished shall be rated for motor protection.
C. Power wiring not used for control functions, complete from power source to motor or equipment junction box, including power wiring through starters, shall be provided under Division 26.
D. Coordinate to ensure that electrical devices furnished or provided are compatible with the electrical systems used.
E. Confirm final location of electrical equipment to be installed in the vicinity of piping.
1.4 PAINTING
A. Painting requirements of this section shall conform to Division 9 – Finishes: Painting.
B. Provide surface preparation, priming, and final coat application in strict accordance with manufacturer's recommendations.
SECTION 22 0500
PLUMBING
City of Montebello 22 0500 - 2
Fire Stations 56
Renovation
C. Provide field painting of systems, equipment and miscellaneous metals located outdoors.
Application shall be in strict accordance with manufacturer's recommendations.
D. Provide painting of plumbing piping and equipment exposed in mechanical equipment room and in occupied spaces. Plumbing items to be painted are as follows:
1. Piping, pipe hangers, pipe insulation, and supports
2. Equipment and supports.
3. Accessory items.
1.5 CLEANING, PROTECTION AND ADJUSTMENT
A. Cleaning
1. General cleaning requirements are specified in Division 1 – General Requirements.
2. Upon completion of the work, clean the exterior surface of equipment, accessories, and trim installed. Clean, polish, and leave equipment, accessories, and trim in first-class condition.
B. Protection of Surfaces
1. Protect surfaces from damage during the construction period.
2. Provide plywood or similar material under equipment or materials stored on floors or roofs. Provide protection in areas where construction may damage surfaces.
3. Surfaces damaged during the construction shall be repaired or replaced at no additional cost to the City. The method of repairing or replacing the surface shall be approved by the Engineer.
C. Protection of Services
1. Protect services from damage during the construction period.
2. Repair, replace and maintain utilities, facilities or services (underground, above ground, interior or exterior) damaged, broken or otherwise rendered inoperative during the course of construction.
3. Services damaged during the construction shall be replaced at the cost of the Contractor at fault. The method used in repairing, replacing or maintaining the services shall be approved by the Engineer.
D. Protection of Equipment and Materials
1. Equipment and materials shall be stored in a manner that shall maintain an orderly, clean appearance. If stored on-site in open or unprotected areas, equipment and material shall be kept off the ground and out of standing water by means of pallets or racks, and covered with tarpaulins.
2. Equipment and material, if left unprotected and damaged, shall be repainted or otherwise refurbished at the discretion of the Owner. Equipment and material is subject to rejection and replacement if, in the opinion of the Engineer or manufacturer the equipment has deteriorated or been damaged to the extent that its immediate use or performance is questionable, or that its normal life expectancy has been curtailed.
3. During the construction period, protect piping, fittings, valves, equipment, and associated appurtenances from damage and dirt. Each system of piping shall be flushed to remove grit, dirt, sand, and other foreign matter for as long a time as required to thoroughly clean the systems.
E. Adjustment
1. After the entire installation has been completed, make required adjustments to balancing valves, circulating systems, pressure reducing valves and similar devices until performance requirements are met.
SECTION 22 0500
PLUMBING
City of Montebello 22 0500 - 3
Fire Stations 56
Renovation
2. Provide factory-lubricated bearings for equipment. Before initial startup of equipment, inspect and verify bearings for proper amounts of lubricant. If required, provide proper amounts of lubricant in accordance with manufacturer's recommendations.
1.6 DIELECTRIC FITTINGS
A. Ferrous to non-ferrous pipe connections shall be made with threaded, soldered, plain, or welded end connections that match piping system material. Dielectric fittings shall prevent any electrolytic action between dissimilar materials.
1.7 PIPING CONNECTIONS
A. Make pipe connections according to the following
1. Provide unions in supply piping systems 4 inches and smaller:
a. Adjacent to each side of valve
b. At final connection to equipment
2. Provide flanged connections for supply piping systems 4 ½ inches and larger:
a. Adjacent to each side of valve
b. At final connection to equipment
3. Provide sewer lateral cleanout:
a. As indicated on Plans.
1.8 SLEEVES AND SEALS
A. Sleeves for Pipes through Non-fire Rated Floors: 18 gage (1.2 mm thick) galvanized steel.
B. Sleeves for Pipes through Non-fire Rated Beams, Walls, Footings, and Potentially Wet Floors:
Steel pipe or 18 gage (1.2 mm thick) galvanized steel.
C. Sleeves for Round Ductwork: Galvanized steel.
D. Sleeves for Rectangular Ductwork: Galvanized steel or wood.
E. Sealant: refer to Section 07 92 00 – Joint Sealants.
PART 2 - PRODUCTS
2.1 PIPE HANGERS AND SUPPORTS
A. Manufacturers: Subject to compliance with project requirements, manufacturers offering Products which may be incorporated in the Work include the following:
1. Grinnell.
2. Elcen.
3. Fee and Mason.
4. Kin-Line.
5. Michigan.
6. Unistrut.
7. Or approved equal.
B. Plumbing Piping - DWV:
1. Conform to ASTM F708.
2. Hangers for Pipe Sizes 1/2 to 1-1/2 Inch (13 to 38 mm): Malleable iron, adjustable swivel, split ring.
3. Hangers for Pipe Sizes 2 Inches (50 mm) and Over: Carbon steel, adjustable, clevis.
SECTION 22 0500
PLUMBING
City of Montebello 22 0500 - 4
Fire Stations 56
Renovation
4. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.
5. Wall Support for Pipe Sizes to 3 Inches (75 mm): Cast iron hook.
6. Wall Support for Pipe Sizes 4 Inches (100 mm) and Over: Welded steel bracket and wrought steel clamp.
7. Vertical Support: Steel riser clamp.
8. Floor Support: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.
9. Copper Pipe Support: Carbon steel ring, adjustable, copper plated.
C. Plumbing Piping - Water:
1. Conform to ASTM F708.
2. Hangers for Pipe Sizes 1/2 to 1-1/2 Inch (13 to 38 mm): Malleable iron adjustable swivel, split ring.
3. Hangers for Cold Pipe Sizes 2 Inches (50 mm) and Over: Carbon steel, adjustable, clevis.
4. Hangers for Hot Pipe Sizes 2 to 4 Inches (50 to 100 mm): Carbon steel, adjustable, clevis.
5. Hangers for Hot Pipe Sizes 6 Inches (150 mm) and Over: Adjustable steel yoke, cast iron roll, double hanger.
6. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.
7. Multiple or Trapeze Hangers for Hot Pipe Sizes 6 Inches (150 mm) and Over: Steel channels with welded spacers and hanger rods, cast iron roll.
8. Wall Support for Pipe Sizes to 3 Inches (76 mm): Cast iron hook.
9. Wall Support for Pipe Sizes 4 Inches (100 mm) and Over: Welded steel bracket and wrought steel clamp.
10. Wall Support for Hot Pipe Sizes 6 Inches (150 mm) and Over: Welded steel bracket and wrought steel clamp with adjustable steel yoke and cast-iron roll.
11. Vertical Support: Steel riser clamp.
12. Floor Support for Cold Pipe: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.
13. Floor Support for Hot Pipe Sizes to 4 Inches (100 mm): Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.
14. Floor Support for Hot Pipe Sizes 6 Inches (150 mm) and Over: Adjustable cast iron roll and stand, steel screws, and concrete pier or steel support.
15. Copper Pipe Support: Carbon steel ring, adjustable, copper plated.
2.2 PIPE HANGER AND SUPPORT SCHEDULE
HANGER ROD
PIPE SIZE MAX. HANGER SPACING DIAMETER
Inches (mm) Feet (m) Inches (mm)
1/2 to 1-1/4 6.5 (2) 3/8 (9)
(12 to 32)
1-1/2 to 2 10 (3) 3/8 (9)
(38 to 50)
2-1/2 to 3 10 (3) 1/2 (13)
(62 to 75)
4 to 6 10 (3) 5/8 (15)
(100 to 150)
8 to 12 14 (4.25) 7/8 (22)
(200 to 300)
SECTION 22 0500
PLUMBING
City of Montebello 22 0500 - 5
Fire Stations 56
Renovation
PVC (All Sizes) 6 (1.8) 3/8 (9)
C.I. Bell and
Spigot (or No-Hub) 5 (1.5) 1/2 (13)
and at Joints
2.3 PROTECTION OF ELECTRICAL EQUIPMENT
A. Plan and arrange overhead piping to avoid dedicated electrical space that may include motors, controllers, switchboards, panel boards, or similar equipment.
1. Dedicated electrical space is equal to the width and depth of the electrical components and extends from the floor to a height of 6 feet above the electrical components or to the structural ceiling, whichever is lower. No piping, leak detection apparatus, equipment, components or associated appurtenances foreign to the electrical installation shall be located in the dedicated electrical space.
2. Dropped, suspended, or any other type of ceiling that does not add strength to the building structure cannot be provided as a separation between dedicated electrical spaces for the installation of foreign components within the dedicated electrical space.
B. Where the installation of foreign components occurs above the dedicated electrical space (6 feet above the electrical systems), contractor shall provide a means of secondary containment to prevent damage to the electrical systems.
C. Secondary Containment Piping System
1. Piping system shall consist of clear unpigmented Polyvinyl Chloride pipe and fittings.
The containment piping system shall be longitudinally split. The pipe shall align via a tongue and groove and the fittings shall be manufactured in two halves.
2. The pipe and fitting shall be temporarily held together by clips affixed over top of integral fitting clip locators. Final system joining shall be provided by welding components together via an injection bonding process.
3. Final containment inspection shall be provided via a low-pressure air test per manufacturer’s requirements.
2.4 DIELECTRIC FITTINGS
A. Dielectric unions shall be factory – fabricated assemblies with a minimum working pressure as required to suit system pressures.
B. Dielectric flanges shall be factory – fabricated, companion flange assemblies with a minimum working pressure as required to suit system pressures.
C. Dielectric flange kits shall be field – fabricated with a minimum working pressure as required to suit system pressures. Kit shall include flanges, full face type phenolic gasket, phenolic bolt sleeves, phenolic washers, and steel backing washers.
D. Dielectric couplings shall be galvanized steel with inert and noncorrosive, thermoplastic lining, threaded ends and a minimum working pressure as required to suit system pressures.
E. Dielectric nipples shall be electroplated steel nipple with unert and noncorrosive, thermoplastic lining, plain, threaded, or grooved ends and a minimum working pressure as required to suit system pressures.
F. Acceptable Manufacturers:
1. Watts Industries
2. Zurn Industries
SECTION 22 0500
PLUMBING
City of Montebello 22 0500 - 6
Fire Stations 56
Renovation
3. Sioux Chief Industries
4. Or approved equal.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 70 00 - Execution and Closeout Requirements: Verification of existing conditions before starting work.
B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.
C. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected and approved by the Engineer.
D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.
3.2 PREPARATION - MECHANICAL IDENTIFICATION
A. Degrease and clean surfaces to receive adhesive for identification materials.
3.3 INSTALLATION - GENERAL
A. Install in accordance with manufacturer's instructions.
B. The use of lead-containing solder for plumbing and plumbing fixtures is prohibited in the construction of this project.
3.4 INSTALLATION - PIPE HANGER AND SUPPORTS
A. Support horizontal piping as scheduled.
B. Install hangers to provide minimum 1/2-inch (13 mm) space between finished covering and adjacent work.
C. Place hangers within 12 inches (300 mm) of each horizontal elbow.
D. Use hangers with 1-1/2 inch (38 mm) minimum vertical adjustment.
E. Support horizontal cast iron pipe adjacent to each hub, with 5 feet (1.5 m) maximum spacing between hangers.
F. Where several pipes can be installed in parallel and at same elevation, provide multiple or trapeze hangers.
G. Support riser piping independently of connected horizontal piping.
H. Provide copper plated hangers and supports for copper piping.
I. Design hangers for pipe movement without disengagement of supported pipe.
SECTION 22 0500
PLUMBING
City of Montebello 22 0500 - 7
Fire Stations 56
Renovation
J. Prime coat exposed steel hangers and supports. Hangers and supports located in crawl spaces, pipe shafts, and suspended ceiling spaces are not considered exposed.
3.5 INSTALLATION - MECHANICAL IDENTIFICATION
A. Install identifying devices after completion of coverings and painting.
B. Install plastic nameplates with corrosive-resistant mechanical fasteners, or adhesive.
C. Install tags using corrosion resistant chain. Number tags consecutively by location.
D. Install underground plastic pipe markers 6 to 8 inches (150 to 200 mm) below finished grade, directly above buried pipe.
E. Identify control panels and major control components outside panels with plastic nameplates.
F. Identify valves in main and branch piping with tags.
G. Identify piping, concealed or exposed, with plastic pipe markers and plastic tape pipe markers.
Use tags on piping 3/4-inch (20 mm) diameter and smaller. Identify service, flow direction, and pressure. Install in clear view and align with axis of piping. Locate identification not to exceed 20 feet (6 m) on straight runs including risers and drops, adjacent to each valve and tee, at each side of penetration of structure or enclosure, and at each obstruction.
Payment for all items of work identified in Division 22 in the plans and these specifications will be based on the lump sum pricing for items identified as Plumbing in the Bid Schedule. No additional Compensation will be allowed.
END OF SECTION
SECTION 22 0522
COMMON WORK RESULTS FOR PLUMBING
City of Montebello 22 0522 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes the following:
A. Piping materials and installation instructions common to most piping systems.
B. Dielectric fittings.
C. Mechanical sleeve seals.
D. Sleeves.
E. Escutcheons.
F. Plumbing demolition.
G. Equipment installation requirements common to equipment sections.
H. Supports and anchorages.
1.2 DEFINITIONS
A. Finished Spaces: Spaces other than plumbing and electrical equipment rooms, furred spaces, pipe chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and plumbing equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in chases.
E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.
1.3 SUBMITTALS
A. Welding Certificates
1.4 DELIVERY, STORAGE, AND HANDLING
A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural Welding Code--Steel."
B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications.”
1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."
2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.
C. Electrical Characteristics for Plumbing Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirement
SECTION 22 0522
COMMON WORK RESULTS FOR PLUMBING
City of Montebello 22 0522 - 2
Fire Stations 56
Renovation
PART 2 - PRODUCTS
2.1 PIPE, TUBE, AND FITTINGS
A. ASME B1.20.1 for factory-threaded pipe and pipe fittings.
2.2 JOINING MATERIALS
A. Refer to individual Division 22 piping Sections for special joining materials not listed below.
B. Pipe-Flange Gasket Materials: ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch (3.2- mm) maximum thickness unless thickness or specific material is indicated.
C. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.
D. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813.
E. Brazing Filler Metals: AWS A5.8, BCuP Series or BAg1, unless otherwise indicated.
F. Welding Filler Metals: Comply with AWS D10.12.
G. Solvent Cements for Joining Plastic Piping:
1. ABS Piping: ASTM D 2235.
2. CPVC Piping: ASTM F 493.
3. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656.
4. PVC to ABS Piping Transition: ASTM D 3138.
2.3 DIELECTRIC FITTINGS
A. Description: Combination fitting of copper alloy and ferrous materials with threaded, solder- joint, plain, or weld-neck end connections that match piping system materials.
B. Insulating Material: Suitable for system fluid, pressure, and temperature.
C. Dielectric Unions: Factory-fabricated, union assembly, for 250-psig (1725-kPa) minimum working pressure at 180 deg F (82 deg C).
D. Dielectric Flanges: Factory-fabricated, companion-flange assembly, for 150- or 300-psig (1035- or 2070-kPa) minimum working pressure as required to suit system pressures.
E. Dielectric Couplings: Galvanized-steel coupling with inert and noncorrosive, thermoplastic lining; threaded ends; and 300-psig (2070-kPa) minimum working pressure at 225 deg F (107 deg C).
F. Dielectric Nipples: Electroplated steel nipple with inert and noncorrosive, thermoplastic lining; plain, threaded, or grooved ends; and 300-psig (2070-kPa) minimum working pressure at 225 deg F (107 deg C).
2.4 MECHANICAL SLEEVE SEALS
A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.
B. Sealing Elements: EPDM NBR interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.
SECTION 22 0522
COMMON WORK RESULTS FOR PLUMBING
City of Montebello 22 0522 - 3
Fire Stations 56
Renovation
C. Pressure Plates: Carbon steel Include two for each sealing element.
D. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of length required to secure pressure plates to sealing elements. Include one for each sealing element.
2.5 SLEEVES
A. Galvanized-Steel Sheet: 0.0239-inch (0.6-mm) minimum thickness; round tube closed with welded longitudinal joint.
B. Steel Pipe: ASTM A 53, Type E, Grade B, Schedule 40, galvanized, plain ends.
C. Cast Iron: Cast or fabricated "wall pipe" equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
D. Stack Sleeve Fittings: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing.
1. Underdeck Clamp: Clamping ring with set screws.
E. Molded PVC: Permanent, with nailing flange for attaching to wooden forms.
F. PVC Pipe: ASTM D 1785, Schedule 40.
G. Molded PE: Reusable, PE, tapered-cup shaped, and smooth-outer surface with nailing flange for attaching to wooden forms.
2.6 ESCUTCHEONS
A. Description: Manufactured wall and ceiling escutcheons and floor plates, with an ID to closely fit around pipe, tube, and insulation of insulated piping and an OD that completely covers opening.
B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with polished chrome- plated finish.
C. Split-Casting, Cast-Brass Type: With concealed hinge and set screw.
1. Finish: Polished chrome-plated.
PART 3 - EXECUTION
3.1 PLUMBING DEMOLITION
A. Refer to Division 01 Section "Cutting and Patching" and Division 02 Section "Selective Structure Demolition" for general demolition requirements and procedures.
B. Disconnect, demolish, and remove plumbing systems, equipment, and components indicated to be removed.
1. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
2. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material.
3. Equipment to Be Removed: Disconnect and cap services and remove equipment.
4. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
5. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
SECTION 22 0522
COMMON WORK RESULTS FOR PLUMBING
City of Montebello 22 0522 - 4
Fire Stations 56
Renovation
C. If pipe, insulation, or equipment to remain is damaged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.
3.2 PIPING SYSTEMS – COMMON REQUIREMENTS
A. Install piping according to the following requirements and Division 22 Sections specifying piping systems.
B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.
D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.
F. Install piping to permit valve servicing.
G. Install piping at indicated slopes.
H. Install piping free of sags and bends.
I. Install fittings for changes in direction and branch connections.
J. Install piping to allow application of insulation.
K. Select system components with pressure rating equal to or greater than system operating pressure.
L. Install escutcheons for penetrations of walls, ceilings, and floors.
M. Install sleeves for pipes passing through concrete and masonry walls, gypsum-board partitions, and concrete floor and roof slabs.
N. Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch (25-mm) annular clear space between pipe and sleeve for installing mechanical sleeve seals.
1. Install steel pipe for sleeves smaller than 6 inches (150 mm) in diameter.
2. Install cast-iron "wall pipes" for sleeves 6 inches (150 mm) and larger in diameter.
3. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
O. Underground, Exterior-Wall Pipe Penetrations: Install cast-iron "wall pipes" for sleeves. Seal pipe penetrations using mechanical sleeve seals. Select sleeve size to allow for 1-inch (25- mm) annular clear space between pipe and sleeve for installing mechanical sleeve seals.
1. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
P. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Refer to Division 07 Section "Penetration Firestopping" for materials.
Q. Verify final equipment locations for roughing-in.
R. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.
SECTION 22 0522
COMMON WORK RESULTS FOR PLUMBING
City of Montebello 22 0522 - 5
Fire Stations 56
Renovation
3.3 PIPING JOINT CONSTRUCTION
A. Join pipe and fittings according to the following requirements and Division 22 Sections specifying piping systems.
B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.
E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8.
F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.
G. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.
H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.
I. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:
1. Comply with ASTM F 402, for safe-handling practice of cleaners, primers, and solvent cements.
2. ABS Piping: Join according to ASTM D 2235 and ASTM D 2661 Appendixes.
3. CPVC Piping: Join according to ASTM D 2846/D 2846M Appendix.
4. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and PVC socket fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.
5. PVC Nonpressure Piping: Join according to ASTM D 2855.
6. PVC to ABS Nonpressure Transition Fittings: Join according to ASTM D 3138 Appendix.
J. Plastic Pressure Piping Gasketed Joints: Join according to ASTM D 3139.
K. Plastic Nonpressure Piping Gasketed Joints: Join according to ASTM D 3212.
L. PE Piping Heat-Fusion Joints: Clean and dry joining surfaces by wiping with clean cloth or paper towels. Join according to ASTM D 2657.
1. Plain-End Pipe and Fittings: Use butt fusion.
2. Plain-End Pipe and Socket Fittings: Use socket fusion.
M. Fiberglass Bonded Joints: Prepare pipe ends and fittings, apply adhesive, and join according to pipe manufacturer's written instructions.
3.4 PIPING CONNECTIONS
A. Make connections according to the following, unless otherwise indicated:
1. Install unions, in piping NPS 2 (DN 50) and smaller, adjacent to each valve and at final connection to each piece of equipment.
2. Install flanges, in piping NPS 2-1/2 (DN 65) and larger, adjacent to flanged valves and at final connection to each piece of equipment.
3. Dry Piping Systems: Install dielectric unions and flanges to connect piping materials of dissimilar metals.
4. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals.
SECTION 22 0522
COMMON WORK RESULTS FOR PLUMBING
City of Montebello 22 0522 - 6
Fire Stations 56
Renovation
3.5 EQUIPMENT INSTALLATION – COMMON REQUIREMENTS
A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated.
B. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.
C. Install plumbing equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.
D. Install equipment to allow right of way for piping installed at required slope.
3.6 ERECTION OF METAL SUPPORTS AND ANCHORAGES:
A. Refer to Division 05 Section "Metal Fabrications" for structural steel.
B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor plumbing materials and equipment.
C. Field Welding: Comply with AWS D1.1.
3.7 ERECTION OF WOOD SUPPORTS AND ANCHORAGES
A. Cut, fit, and place wood grounds, nailers, blocking, and anchorages to support, and anchor plumbing materials and equipment.
B. Select fastener sizes that will not penetrate members if opposite side will be exposed to view or will receive finish materials. Tighten connections between members. Install fasteners without splitting wood members.
C. Attach to substrates as required to support applied loads.
END OF SECTION
SECTION 22 1116
DOMESTIC WATER PIPING
City of Montebello 22 1116 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Aboveground domestic water pipes, tubes, fittings, and valve above grade and inside the building.
2. Valves.
3. Dielectric Fittings.
4. Escutcheons.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Field quality-control reports.
1.3 QUALITY ASSURANCE
A. Piping materials shall bear label, stamp, or other markings of specified testing agency.
B. Comply with NSF 61 for potable domestic water piping and components.
PART 2 - PRODUCTS
2.1 COPPER TUBE AND FITTINGS
A. Hard Copper Tube: ASTM B 88, Type L water tube, drawn temper.
1. Wrought-Copper Solder-Joint Fittings: ASME B16.22, wrought-copper pressure fittings.
2. Bronze Flanges: ASME B16.24, Class 150, with solder-joint ends.
3. Copper Unions: MSS SP-123, cast-copper-alloy, hexagonal-stock body, with ball-and- socket, metal-to-metal seating surfaces, and solder-joint ends.
2.2 PIPING JOINING MATERIALS
A. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.
B. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813.
2.3 BALL VALVES
A. Manufacturers:
1. Grinnell Corporation.
2. Other acceptable manufacturers offering equivalent products. a. Hammond Valve.
b. Milwaukee Valve Company.
SECTION 22 1116
DOMESTIC WATER PIPING
City of Montebello 22 1116 - 2
Fire Stations 56
Renovation
c. Red-White Valve Corporation.
d. Nibco.
e. Apollo.
f. Or equal.
B. Up to 2 Inches: Bronze two-piece body, stainless or chrome plated steel ball, Teflon seats and stuffing box ring, lever handle solder or threaded ends. Note: Three-piece full port ball valves are recommended up to 3”. Also recommended to add option for extended handle stem for insulated pipes.
C. Over 2 Inches: Cast steel body, chrome plated steel ball, Teflon seat and stuffing box seals, lever handle, flanged.
2.4 DIELECTRIC FITTINGS
A. General Requirements: Assembly of copper alloy and ferrous materials or ferrous material body with separating nonconductive insulating material suitable for system fluid, pressure, and temperature.
B. Dielectric Unions:
1. Description:
a. Pressure Rating: 150 psig at 180 deg F.
b. End Connections: Solder-joint copper alloy and threaded ferrous.
2.5 ESCUTCHEONS
A. General: Manufactured ceiling, floor, and wall escutcheons and floor plates.
B. One Piece, Cast Brass: Polished, chrome-plated finish with setscrews.
PART 3 - EXECUTION
3.1 PIPING INSTALLATION
A. Drawing plans, schematics, and diagrams indicate general location and arrangement of domestic water piping. Indicated locations and arrangements are used to size pipe and calculate friction loss, expansion, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
B. Install copper tubing under building slab according to CDA's "Copper Tube Handbook." C. Install domestic water piping level and plumb.
D. Install piping concealed from view and protected from physical contact by building occupants unless otherwise indicated.
E. Install nipples, unions, special fittings, and valves with pressure ratings the same as or higher than system pressure rating used in applications below unless otherwise indicated.
F. Install piping free of sags and bends.
G. Install fittings for changes in direction and branch connections.
SECTION 22 1116
DOMESTIC WATER PIPING
City of Montebello 22 1116 - 3
Fire Stations 56
Renovation
3.2 JOINT CONSTRUCTION
A. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
B. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.
C. Soldered Joints: Apply ASTM B 813, water-flushable flux to end of tube. Join copper tube and fittings according to ASTM B 828 or CDA's "Copper Tube Handbook." D. Dissimilar-Material Piping Joints: Make joints using adapters compatible with materials of both piping systems.
3.3 DIELECTRIC FITTING INSTALLATION
A. Install dielectric fittings in piping at connections of dissimilar metal piping and tubing.
B. Dielectric Fittings for NPS 2 and Smaller: Use dielectric unions.
C. Dielectric Fittings for NPS 2-1/2 to NPS 64: Use dielectric flanges or flange kits.
3.4 ESCUTCHEON INSTALLATION
A. Install escutcheons for penetrations of walls, ceilings, and floors.
B. Escutcheons for New Piping:
1. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep pattern.
2. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One piece, cast brass with polished chrome-plated finish.
3.5 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Piping Inspections:
1. Do not enclose, cover, or put piping into operation until it has been inspected and approved by authorities having jurisdiction.
2. During installation, notify authorities having jurisdiction at least one day before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction:
a. Roughing-in Inspection: Arrange for inspection of piping before concealing or closing-in after roughing-in and before setting fixtures. b. Final Inspection: Arrange final inspection for authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements.
3. Reinspection: If authorities having jurisdiction find that piping will not pass tests or inspections, make required corrections and arrange for reinspection.
4. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.
C. Piping Tests:
1. Fill domestic water piping. Check components to determine that they are not air bound and that piping is full of water.
SECTION 22 1116
DOMESTIC WATER PIPING
City of Montebello 22 1116 - 4
Fire Stations 56
Renovation
2. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit a separate report for each test, complete with diagram of portion of piping tested.
3. Leave new, altered, extended, or replaced domestic water piping uncovered and unconcealed until it has been tested and approved. Expose work that was covered or concealed before it was tested.
4. Cap and subject piping to static water pressure of 50 psig above operating pressure, without exceeding pressure rating of piping system materials. Isolate test source and allow to stand for four hours. Leaks and loss in test pressure constitute defects that must be repaired.
5. Repair leaks and defects with new materials and retest piping or portion thereof until satisfactory results are obtained.
6. Prepare reports for tests and for corrective action required.
D. Domestic water piping will be considered defective if it does not pass tests and inspections.
E. Prepare test and inspection reports.
3.6 CLEANING
A. Clean and disinfect potable domestic water piping as follows:
1. Purge new piping and parts of existing piping that have been altered, extended, or repaired before using.
2. Use purging and disinfecting procedures prescribed by authorities having jurisdiction; if methods are not prescribed, use procedures described in either AWWA C651 or AWWA C652 or follow procedures described below:
a. Flush piping system with clean, potable water until dirty water does not appear at outlets.
b. Fill and isolate system according to either of the following:
1) Fill system or part thereof with water/chlorine solution with at least 50 ppm of chlorine. Isolate with valves and allow to stand for 24 hours. 2) Fill system or part thereof with water/chlorine solution with at least 200 ppm of chlorine. Isolate and allow to stand for three hours. c. Flush system with clean, potable water until no chlorine is in water coming from system after the standing time.
d. Submit water samples in sterile bottles to authorities having jurisdiction. Repeat procedures if biological examination shows contamination.
B. Prepare and submit reports of purging and disinfecting activities.
C. Clean interior of domestic water piping system. Remove dirt and debris as work progresses.
END OF SECTION
SECTION 22 1319
SANITARY WASTE PIPING SPECIALTIES
City of Montebello 22 1319 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following sanitary drainage piping specialties:
1. Cleanouts.
2. Floor drains.
3. Roof flashing assemblies.
4. Miscellaneous sanitary drainage piping specialties.
5. Flashing materials.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
1.3 QUALITY ASSURANCE
A. Drainage piping specialties shall bear label, stamp, or other markings of specified testing agency.
PART 2 - PRODUCTS
2.1 CLEANOUTS
A. Cast-Iron Floor Cleanouts:
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Josam Company; Josam Div.
b. Oatey.
c. Sioux Chief Manufacturing Company, Inc.
d. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc. e. Tyler Pipe; Wade Div.
f. Watts Drainage Products Inc.
g. Zurn Plumbing Products Group; Light Commercial Operation. h. Zurn Plumbing Products Group; Specification Drainage Operation.
2. Standard: ASME A112.36.2M for adjustable housing cleanout.
3. Size: Same as connected branch.
4. Closure: Brass plug with straight threads and gasket OR cast-iron plug.
5. Top Loading Classification: Light Duty.
6. Riser: ASTM A 74, Service class, cast-iron drainage pipe fitting and riser to clean out.
B. Cast-Iron Wall Cleanouts:
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Josam Company; Josam Div.
SECTION 22 1319
SANITARY WASTE PIPING SPECIALTIES
City of Montebello 22 1319 - 2
Fire Stations 56
Renovation
b. MIFAB, Inc.
c. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc. d. Tyler Pipe; Wade Div.
e. Watts Drainage Products Inc.
f. Zurn Plumbing Products Group; Specification Drainage Operation.
2. Standard: ASME A112.36.2M. Include wall access.
3. Size: Same as connected drainage piping.
4. Closure Plug Size: Same as or not more than one size smaller than cleanout size.
5. Wall Access: Round, flat, chrome-plated brass or stainless-steel cover plate with screw.
2.2 FLOOR DRAINS
A. Cast-Iron Floor Drains:
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Commercial Enameling Co.
b. Josam Company; Josam Div.
c. MIFAB, Inc.
d. Prier Products, Inc.
e. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc. f. Tyler Pipe; Wade Div.
g. Watts Drainage Products Inc.
h. Zurn Plumbing Products Group; Light Commercial Operation. i. Zurn Plumbing Products Group; Specification Drainage Operation.
2. Standard: ASME A112.6.3 with backwater valve, if required.
3. Body Material: Gray iron.
4. Backwater Valve: Integral, ASME A112.14.1, swing-check type, if required.
5. Coating on Interior and Exposed Exterior Surfaces: Acid-resistant enamel, where required.
6. Sediment Bucket:
7. Top or Strainer Material: Nickel bronze.
8. Top of Body and Strainer Finish: [Nickel bronze] [Polished bronze] [Rough bronze] <Insert finish>.
9. Top Shape: Square.
10. Top Loading Classification: Light Duty.
2.3 ROOF FLASHING ASSEMBLIES
A. Roof Flashing Assemblies:
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Acorn Engineering Company; Elmdor/Stoneman Div.
b. Thaler Metal Industries Ltd.
B. Description: Manufactured assembly made of 6.0-lb/sq. ft., 0.0938-inch-thick, lead flashing collar and skirt extending at least 10 inches from pipe, with galvanized-steel boot reinforcement and counterflashing fitting.
1. Open-Top Vent Cap: Without cap.
SECTION 22 1319
SANITARY WASTE PIPING SPECIALTIES
City of Montebello 22 1319 - 3
Fire Stations 56
Renovation
2. Low-Silhouette Vent Cap: With vandal-proof vent cap.
3. Extended Vent Cap: With field-installed, vandal-proof vent cap.
2.4 MISCELLANEOUS SANITARY DRAINAGE PIPING SPECIALTIES
A. Air-Gap Fittings:
1. Standard: ASME A112.1.2, for fitting designed to ensure fixed, positive air gap between installed inlet and outlet piping.
2. Body: Bronze or cast iron.
3. Inlet: Opening in top of body.
4. Outlet: Larger than inlet.
5. Size: Same as connected waste piping and with inlet large enough for associated indirect waste piping.
B. Vent Caps:
1. Description: Cast-iron body with threaded or hub inlet and vandal-proof design. Include vented hood and setscrews to secure to vent pipe.
2. Size: Same as connected stack vent or vent stack.
2.5 FLASHING MATERIALS
A. Lead Sheet: ASTM B 749, Type L51121, copper bearing, with the following minimum weights and thicknesses, unless otherwise indicated:
1. General Use: 6-lb/sq. ft., 0.0938-inch thickness.
B. Fasteners: Metal compatible with material and substrate being fastened.
C. Metal Accessories: Sheet metal strips, clamps, anchoring devices, and similar accessory units required for installation; matching or compatible with material being installed.
D. Solder: ASTM B 32, lead-free alloy.
E. Bituminous Coating: SSPC-Paint 12, solvent-type, bituminous mastic.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Refer to Division 22 Section 22 05 22 "Common Work Results for Plumbing" for piping joining materials, joint construction, and basic installation requirements.
B. Install cleanouts in aboveground piping according to the following, unless otherwise indicated:
1. Size same as drainage piping up to NPS 4. Use NPS 4 for larger drainage piping unless larger cleanout is indicated.
2. Locate at each change in direction of piping greater than 45 degrees.
3. Locate at minimum intervals of 50 feet for piping NPS 4 and smaller and 100 feet for larger piping.
C. For floor cleanouts for piping below floors, install cleanout deck plates with top flush with finished floor.
SECTION 22 1319
SANITARY WASTE PIPING SPECIALTIES
City of Montebello 22 1319 - 4
Fire Stations 56
Renovation
D. For cleanouts located in concealed piping, install cleanout wall access covers, of types indicated, with frame and cover flush with finished wall.
E. Install floor drains at low points of surface areas to be drained. Set grates of drains flush with finished floor, unless otherwise indicated.
1. Position floor drains for easy access and maintenance.
2. Set floor drains below elevation of surrounding finished floor to allow floor drainage. Set with grates depressed according to the following drainage area radii:
a. Radius, 30 Inches or Less: Equivalent to 1 percent slope, but not less than 1/4-inch total depression.
b. Radius, 30 to 60 Inches: Equivalent to 1 percent slope. c. Radius, 60 Inches or Larger: Equivalent to 1 percent slope, but not greater than 1- inch total depression.
3. Install floor-drain flashing collar or flange so no leakage occurs between drain and adjoining flooring. Maintain integrity of waterproof membranes where penetrated.
4. Install individual traps for floor drains connected to sanitary building drain, unless otherwise indicated.
F. Install roof flashing assemblies on sanitary stack vents and vent stacks that extend through roof.
G. Install flashing fittings on sanitary stack vents and vent stacks that extend through roof.
H. Install floor-drain, trap-seal primer fittings on inlet to floor drains that require trap-seal primer connection.
1. Exception: Fitting may be omitted if trap has trap-seal primer connection.
2. Size: Same as floor drain inlet.
I. Install air-gap fittings on draining indirect-waste piping discharge into sanitary drainage system.
J. Install vent caps on each vent pipe passing through roof.
K. Install escutcheons at wall, floor, and ceiling penetrations in exposed finished locations and within cabinets and millwork. Use deep-pattern escutcheons if required to conceal protruding pipe fittings.
3.2 CONNECTIONS
A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Install piping adjacent to equipment to allow service and maintenance.
3.3 FLASHING INSTALLATION
A. Install sheet flashing on pipes, sleeves, and specialties passing through or embedded in floors and roofs with waterproof membrane.
1. Pipe Flashing: Sleeve type, matching pipe size, with minimum length of 10 inches, and skirt or flange extending at least 8 inches around pipe.
2. Sleeve Flashing: Flat sheet, with skirt or flange extending at least 8 inches around sleeve.
B. Set flashing on floors and roofs in solid coating of bituminous cement.
C. Secure flashing into sleeve and specialty clamping ring or device.
SECTION 22 1319
SANITARY WASTE PIPING SPECIALTIES
City of Montebello 22 1319 - 5
Fire Stations 56
Renovation
D. Install flashing for piping passing through roofs with counterflashing or commercially made flashing fittings, according to Division 07 Section "Sheet Metal Flashing and Trim." E. Extend flashing up vent pipe passing through roofs and turn down into pipe, or secure flashing into cast-iron sleeve having calking recess.
3.4 PROTECTION
A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and to prevent damage from traffic or construction work.
B. Place plugs in ends of uncompleted piping at end of each day or when work stops.
END OF SECTION
SECTION 22 4000
PLUMBING FIXTURES AND EQUIPMENT
City of Montebello 22 4000 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Water closets.
2. Lavatories.
3. Urinals.
4. Protective shielding guards.
B. Related Documents: The Contract Documents, as defined in Section 01 10 00 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents.
C. Related Sections:
1. Section 07 9200 - Joint Sealants: Seal fixtures to walls and floors.
2. Section 22 0500 - Plumbing
1.2 REFERENCES
A. American Society of Mechanical Engineers (ASME):
1. ASME A112.18.1 - Finished and Rough Brass Plumbing Fixture Fittings.
1.3 SUBMITTALS
A. Section 01 6000 – Product Requirements, Product Data, and Samples: Procedures for submittals.
1. Product Data:
a. Product Data: Provide catalogue illustrations of fixtures, sizes, rough-in dimensions, utility sizes, trim, and finishes.
b. Provide submittals for all fixtures and equipment, and all associated trim and hardware.
B. Section 01 7704 – Closeout Procedures and Training: Procedures for closeout submittals.
1. Project Record Documents: Accurately record the following:
a. Operation and Maintenance Data: Include fixture trim exploded view and replacement parts lists.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Section 01 6000 – Product Requirements: Transport, handle, store, and protect Products.
B. Only accept fixtures on site in factory packaging. Inspect for damage.
C. Protect installed fixtures from damage by securing areas and by leaving factory packaging in place to protect fixtures and prevent use.
SECTION 22 4000
PLUMBING FIXTURES AND EQUIPMENT
City of Montebello 22 4000 - 2
Fire Stations 56
Renovation
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Subject to compliance with project requirements, manufacturers offering Products which may be incorporated in the Work include the following:
1. Drinking Fountain with bottle filler:
a. Elkay.
b. Hawley.
c. Or approved equal.
2. Floor Drain:
a. J. R. Smith.
b. Zurn.
c. Or approved equal.
3. Lavatory:
a. American Standard.
b. Kohler.
c. Or approved equal.
4. Stainless Steel Sink:
a. Elkay.
b. Just.
c. American Standard
d. Or approved equal.
5. Shower Drain:
a. J. R. Smith.
b. Zurn.
c. Or approved equal.
6. Shower Valve, Shower Trim, and Shower Head:
a. Chicago Faucet.
b. American Standard.
c. Or approved equal.
7. Water closets:
a. American Standard.
b. Kohler.
c. Or approved equal.
8. Faucet (for Lavatory, Kitchen Sink, Mop Sink):
a. Chicago Faucet.
b. American Standard.
c. Or approved equal.
9. Flush Valve:
a. American Standard.
b. Kohler.
c. Or approved equal.
10. Water Heater:
a. American Standard.
b. Bradford White
c. Or approved equal.
B. Furnish and install Products as indicated in Drawings.
SECTION 22 4000
PLUMBING FIXTURES AND EQUIPMENT
City of Montebello 22 4000 - 3
Fire Stations 56
Renovation
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 7300 - Execution: Verification of existing conditions before starting work.
B. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.
1. Verify that walls and floor finishes are prepared and ready for installation of fixtures.
2. Verify that electric power is available and of the correct characteristics.
C. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected and approved by the Engineer.
D. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.
3.2 PREPARATION
A. Rough-in fixture piping connections in accordance with minimum sizes indicated in fixture rough- in schedule for particular fixtures.
3.3 INSTALLATION
A. Plumbing Fixtures:
1. Install in accordance with manufacturer's instructions.
2. Install each fixture with trap, easily removable for servicing and cleaning.
3. Provide chrome plated rigid or flexible supplies to fixtures with screwdriver stops, reducers, and escutcheons.
4. Install components level and plumb.
5. Install and secure fixtures in place with wall carriers and bolts.
6. Seal fixtures to wall and floor surfaces with sealant.
7. Water Closets, Urinals and Lavatories: Provide adjustable cast iron fixture supports for all wall hung water closets, except where single vertical carriers in shallow walls occur.
8. The use of lead-containing solder for plumbing and plumbing fixtures is prohibited in the construction of this project.
B. Trap Primers
1. Install primers under sinks and/or lavatories, and behind access panels out of line of sight.
Provide access panels
2. Trap primers to have approval of plumbing and drainage institute.
3. Install trap primers in accordance with manufacturer's recommendations.
C. Backflow Preventers
1. Install in accordance with manufacturer's recommendations.
2. Pipe relief through fixed air gap and discharge to sewer.
3. Install adjacent to wall and/or floor utilizing stand-off brackets, angle frame, and/or concrete piers.
4. Test unit for leaks and pressure drop. Clean and/or replace soiled strainer media.
D. Protective Shielding Guards
SECTION 22 4000
PLUMBING FIXTURES AND EQUIPMENT
City of Montebello 22 4000 - 4
Fire Stations 56
Renovation
1. Manufactured, plastic enclosure for covering hot- and cold-water supplies, trap and drain piping, and complying with ADA requirements and meeting ANSI code for barrier-free design. Provide at all accessible sinks and lavatories.
3.4 ADJUSTING
A. Refer to Specification Section 01 7300 – Execution.
B. Adjust stops or valves for intended water flow rate to fixtures without splashing, noise, or overflow.
3.5 CLEANING
A. At completion clean plumbing fixtures and equipment.
3.6 FIELD QUALITY CONTROL
A. Section 01 4000 - Quality Requirements: Field testing and inspection.
Payment for items of work covered under Division 22 of the plans and these specifications shall be based on the lump sum bid pricing identified in the Bid Schedule. No additional compensation will be allowed.
END OF SECTION
SECTION 22 4223
COMMERCIAL SHOWERS AND VALVES
City of Montebello 22 4223 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Shower valves.
B. Related Documents: The Contract Documents, as defined in Section 01 1000 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents.
C. Related Section:
1. Section 22 0500 – Plumbing
1.2 REFERENCES
A. American Society of Mechanical Engineers (ASME):
1. ASME A112.18.1/CSA B125.1 - Plumbing Supply Fittings.
B. American Society of Sanitary Engineering (ASSE):
1. ASSE 1017-2005 - Performance Requirements for Temperature Actuated Mixing Valves for Hot Water Distribution Systems.
C. International Association of Plumbing and Mechanical Officials (IAPMO):
1. Uniform Plumbing Code US (UPC).
1.3 SUBMITTALS
A. Section 01 3300 - Submittal Procedures: Procedures for submittals.
1. Product Data: Manufacturer’s data sheets.
B. Section 01 7800 - Closeout Submittals: Procedures for closeout submittals.
1. Maintenance Data: For shower faucets to include in maintenance parts manuals.
1.4 QUALITY ASSURANCE
A. Source Limitations: Obtain each type of plumbing fixture and compatible accessories through one source from a single approved manufacturer.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Section 01 6000 - Product Requirements: Transport, handle, store, and protect Products.
B. Only accept fixtures on site in factory packaging. Inspect for damage.
C. Protect installed fixtures from damage by securing areas and by leaving factory packaging in place to protect fixtures and prevent use.
PART 2- PRODUCTS
2.1 MANUFACTURERS
SECTION 22 4223
COMMERCIAL SHOWERS AND VALVES
City of Montebello 22 4223 - 2
Fire Stations 56
Renovation
A. Subject to compliance with project requirements, manufacturers offering Products which may be incorporated in the Work include the following:
1. American Standard.
2. Acorn Engineering Company.
3. Bradley Corporation.
4. Or approved equal.
2.2 COMMERCIAL SHOWERS, GENERAL
A. Commercial Shower Materials and Fabrication
1. Exposed Parts finish: Type 304 stainless steel.
2. Nominal stainless-steel thickness: 14 gauge.
3. Valve Bodies: Bronze.
4. Supply Inlets, Group Showers: 3/4-inch Type L rigid copper.
B. Flow Control: 2.5 gpm unless noted otherwise.
2.3 SHOWER VALVES
A. Shower Valves, General:
1. Valve Bodies: Solid brass coatings.
2. Exposed Parts finish: Type 304 Stainless steel.
3. Nominal stainless-steel thickness: 14 gauge minimum.
4. Control type: Single Lever handle type for compliance with ADA.
B. Thermostatic Mixing Valve.
1. Description: Thermostatic Mixing Valve with inlet check stops, wax-filled thermostat, stainless steel cartridge and stainless-steel piston, adjustable hot temperature limit stop.
2. Faucet:
a. Body Material: Solid Brass.
b. Finish: Polished stainless steel.
c. Operation: Lever handle.
d. Supply Connections: 1/2-inch NPT.
3. Accessible shower control to be located above grab bar but not to exceed 48 inches maximum above finished surface .
C. WALL MOUNT SHOWER HEAD & HOSE
1. 2.5 gpm multifunction hand shower, 60” metal hose, 30-inch slide bar and transitional slide bar trim.
2. 2.5 gpm (gallons per minute) flow rate.
3. Material finish: Polish Chrome, resist corrosion and tarnishing. - EXECUTION
3.1 EXAMINATION
A. Section 01 7000 – Execution and Closeout Requirements: Verification of existing conditions before starting work.
B. Examine water supply, sanitary piping, and vent piping rough in for coordination with shower installation before beginning installation.
SECTION 22 4223
COMMERCIAL SHOWERS AND VALVES
City of Montebello 22 4223 - 3
Fire Stations 56
Renovation
C. Examine architectural installation for compliance with codes and requirements of the manufacturer.
D. Report in writing to the Engineer prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected and approved by the Engineer.
E. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the City.
3.2 INSTALLATION
A. Assemble and install shower components in accordance with manufacturer's instructions. Verify requirements for accessibility dimensions prior to installing.
B. Install stops on each water supply piping.
1. Install stops in locations where they can be easily reached for operation.
C. Install wall flanges or escutcheons at piping wall penetrations in exposed, finished locations. Use deep-pattern escutcheons if required to conceal protruding fittings.
3.3 CONNECTIONS
A. Connect fixtures with water supplies, stops, and risers, and with traps, soil, waste, and vent piping.
B. Comply with water piping, soil waste and vent piping requirements specified in Section 22 05 00 - Plumbing.
3.4 ADJUSTING
A. Operate and adjust showers and controls and adjust water pressure as needed. Replace damaged and malfunctioning showers, fittings, and controls.
3.5 CLEANING AND PROTECTION
A. Repair any damaged finishes after installation is complete.
B. Clean shower equipment and basins with manufacturer's recommended cleaning products.
C. Add protective covering after installation.
END OF SECTION
SECTION 23 0593
TESTING, ADJUSTING AND BALANCING FOR HVAC
City of Montebello 23 0593 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Testing, adjustment, and balancing of air systems.
2. Measurement of final operating condition of HVAC systems.
B. Related Documents: The Contract Documents, as defined in Section 01 1000 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents.
1.2 REFERENCES
A. Associated Air Balance Council (AABC):
1. AABC - National Standards for Total System Balance.
B. National Environmental Balancing Bureau.
1.3 SUBMITTALS
A. Section 01 3300 - Submittal Procedures: Procedures for submittals.
1. Assurance/Control Submittals:
a. Test Reports: Submit the following reports directly to Owner’s Representative from Testing Laboratory, with copy to Contractor. Prepare reports in conformance with Section 01 4000 - Quality Requirements:
1) Indicate deficiencies in systems that would prevent proper testing, adjusting, and balancing of systems and equipment to achieve specified performance. 2) Submit draft copies of report for review prior to final acceptance of Project.
Provide final copies for inclusion in operating and maintenance manuals. 3) Provide reports in binder manuals, complete with index page and indexing tabs, with cover identification at front and side. Include set of reduced drawings with air outlets and equipment identified to correspond with data sheets and indicating thermostat locations.
4) Indicate data on AABC National Standards for Total System Balance forms. b. Certificates: Manufacturer's certificate that Products meet or exceed specified requirements.
c. Qualification Documentation: Submit documentation of experience indicating compliance with specified qualification requirements.
1.4 QUALITY ASSURANCE
A. Qualifications:
1. Company specializing in testing, adjusting, and balancing of specified with minimum 5 years documented experience. Company to be certified by one of the following. a. AABC Certified Independent Testing and Balancing Agency. b. National Environmental Balancing Bureau Certified Independent Agency. (NEBB).
B. Certification: Certify the testing, adjusting, and balancing field data reports.
SECTION 23 0593
TESTING, ADJUSTING AND BALANCING FOR HVAC
City of Montebello 23 0593 - 2
Fire Stations 56
Renovation
C. Testing, Adjusting, and Balancing Reports: Use testing, adjusting, and balancing Agent’s standard forms.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that systems are complete and operable before commencing work. Ensure the following conditions:
1. Systems are started and operating in a safe and normal condition.
2. Temperature control systems are installed complete and operable.
3. Proper thermal overload protection is in place for electrical equipment.
4. Final filters are clean and in place. If required, install temporary media in addition to final filters.
5. Duct systems are clean of debris.
6. Fans are rotating correctly.
7. Fire and volume dampers are in place and open.
8. Air coil fins are cleaned and combed.
9. Access doors are closed, and duct end caps are in place.
10. Air outlets are installed and connected.
11. Duct system leakage is minimized.
3.2 PREPARATION
A. Provide instruments required for testing, adjusting, and balancing operations. Make instruments available to Owner’s Representative to facilitate spot checks during testing.
B. Provide additional balancing instruments as required.
3.3 INSTALLATION TOLERANCES
A. Air Handling Systems: Adjust to within plus or minus 5 percent of design for supply systems and plus or minus 10 percent of design for return and exhaust systems.
B. Air Outlets and Inlets: Adjust total to within plus 10 percent and minus 5 percent of design to space. Adjust outlets and inlets in space to within plus or minus 10 percent of design.
3.4 ADJUSTING
A. Ensure recorded data represents actual measured or observed conditions.
B. Permanently mark settings of valves, dampers, and other adjustment devices allowing settings to be restored. Set and lock memory stops.
C. After adjustment, take measurements to verify balance has not been disrupted or that such disruption has been rectified.
SECTION 23 0593
TESTING, ADJUSTING AND BALANCING FOR HVAC
City of Montebello 23 0593 - 3
Fire Stations 56
Renovation
D. Leave systems in proper working order, replacing belt guards, closing access doors, closing doors to electrical switch boxes, and restoring thermostats to specified settings.
E. At final inspection, recheck random selections of data recorded in report. Recheck points or areas as selected and witnessed by Owner’s Representative.
F. At said time, demonstrate operation of each piece of equipment and / or each system to Owner’s Representative. Provide written statement of operation at end of inspection.
G. Check and adjust systems approximately six months after final acceptance and submit report.
3.5 AIR SYSTEM PROCEDURE
A. Adjust air handling and distribution systems to provide required or design supply, return, and exhaust air quantities. Perform this work with cooling system energized where applicable to obtain the extra resistance of wet coils.
B. Make air quantity measurements in ducts by Pitot tube traverse of entire cross-sectional area of duct.
C. Measure air quantities at air inlets and outlets.
D. Adjust distribution system to obtain uniform space temperatures free from objectionable drafts and noise.
E. Use volume control devices to regulate air quantities only to extend that adjustments do not create objectionable air motion or sound levels. Effect volume control by duct internal devices.
F. Vary total system air quantities by adjustment of fan speeds. Provide drive changes required.
Vary branch air quantities by damper regulation.
G. Provide system schematic with required and actual air quantities recorded at each outlet or inlet.
H. Measure static air pressure conditions on air supply units, including filter and coil pressure drops, and total pressure across the fan. Make allowances for 50 percent loading of filters.
I. Adjust outside air automatic dampers, outside air, return air, and exhaust dampers for design conditions.
J. Measure temperature conditions across outside air, return air, and exhaust dampers to check leakage.
K. Measure building static pressure and adjust supply, return, and exhaust air systems to provide required relationship between each to maintain approximately 0.05 inches (12.5 Pa) positive static pressure near the building entries.
L. Indoor Air Quality:
1. Pre-occupancy ventilation: Provide pre-occupancy ventilation prior to final testing, adjusting, and balancing of HVAC system.
END OF SECTION
SECTION 23 0713
DUCT INSULATION
City of Montebello 23 0713 - 1
Fire Stations 56
Renovation
1.1 SUMMARY
A. Section Includes:
1. Ductwork insulation.
2. Duct liner.
3. Insulation jackets.
B. Related Documents: The Contract Documents, as defined in Section 01 1000 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents.
1.2 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM B209 - Aluminum and Aluminum-Alloy Sheet and Plate.
2. ASTM C177 - Steady-State Heat Flux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus.
3. ASTM C335 - Steady-State Heat Transfer Properties of Horizontal Pipe Insulation.
4. ASTM C518 - Steady-State Heat Flux Measurements and Thermal Transmission Properties by
Means of the Heat Flow Meter Apparatus.
5. ASTM C534 - Preformed Flexible Elastomeric Cellular Thermal Insulation in Sheet and Tubular Form.
6. ASTM C547 - Mineral Fiber Pipe Insulation.
7. ASTM C553 - Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications.
8. ASTM C921 - Properties of Jacketing Materials for Thermal Insulation.
9. ASTM D1056 - Flexible Cellular Materials - Sponge or Expanded Rubber.
10. ASTM E84 2007 Edition - Surface Burning Characteristics of Building Materials.
11. ASTM E96 - Water Vapor Transmission of Materials.
B. National Fire Protection Association (NFPA):
1. NFPA 255 - Standard Method of Test of Surface Burning Characteristics of Building Materials.
C. Sheet Metal and Air Conditioning Contractors National Association (SMACNA):
1. SMACNA - HVAC Duct Construction Standards - Metal and Flexible.
D. Underwriters Laboratories, Inc. (UL):
1. UL 723 - Tests for Surface Burning Characteristics of Building Materials.
1.3 SUBMITTALS
A. Section 01 3300 - Submittal Procedures: Procedures for submittals.
1. Product Data:
a. Product Data: Provide product description, thermal characteristics, list of materials and thickness for each service, and locations.
1.4 QUALITY ASSURANCE
A. Qualifications:
SECTION 23 0713
DUCT INSULATION
City of Montebello 23 0713 - 2
Fire Stations 56
Renovation
1. Manufacturer: Company specializing in manufacturing Products specified with minimum 3 years documented experience.
2. Installer: Company specializing in performing the Work of this Section with minimum 3 years documented experience.
B. Materials:
1. Flame spread/smoke developed rating of 25/50 or less in accordance with ASTM E84, NFPA 255 and UL 723.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Section 01 6000 - Product Requirements: Transport, handle, store, and protect Products.
B. Deliver materials to site in original factory packaging, labeled with manufacturer's identification, including product density and thickness.
C. Store insulation in original wrapping and protect from weather and construction traffic.
D. Protect insulation against dirt, water, chemical, and mechanical damage.
1.6 PROJECT CONDITIONS OR SITE CONDITIONS
A. Jobsite Requirements
1. Maintain ambient temperatures and conditions required by manufacturers of adhesives, mastics, and insulation cements.
2. Maintain temperature during and after installation for minimum period of 24 hours.
1.7 ENVIRONMENTAL REQUIREMENTS
A. Energy efficiency:
1. Insulation: Minimum thickness in accordance with ASHRAE 90.1. Provide additional thickness to ensure surface temperatures are below 100 degrees and to prevent condensation on cold surfaces.
PART 2 - PRODUCTS
2.1 DUCTWORK INSULATION
A. Glass Fiber, Flexible Duct Wrap
1. Manufacturers:
a. Owens/Corning, Toledo, OH (800) 438-7465.
b. Other acceptable manufacturers offering equivalent products. 1) CertainTeed.
2) Schuller (Manville).
3) Knauf.
4) Or equal.
2. Insulation: ASTM C553 flexible, noncombustible blanket. a. 'K' ('Ksi') value: ASTM C518, 0.30 at 75 degrees F. b. Maximum service temperature: 250 degrees F.
c. Maximum moisture absorption: 0.20 percent by volume.
SECTION 23 0713
DUCT INSULATION
City of Montebello 23 0713 - 3
Fire Stations 56
Renovation
d. Density: 0.75 lb./cu ft.
3. Vapor Barrier Jacket
a. Kraft paper reinforced with glass fiber yarn and bonded to aluminized film. b. Moisture vapor transmission: ASTM E96; 0.02 perm.
c. Secure with pressure sensitive tape.
4. Vapor Barrier Tape
a. Manufacturers:
1) Owens/Corning.
2) CertainTeed.
3) Schuller (Manville).
4) Or equal.
b. Kraft paper reinforced with glass fiber yarn and bonded to aluminized film, with pressure sensitive rubber-based adhesive.
5. Tie Wire: Annealed steel, 16 gage.
B. Glass Fiber Duct Liner, Flexible
1. Manufacturers:
a. CertainTeed.
b. Other acceptable manufacturers offering equivalent products. 1) Knauf.
2) Schuller (Manville).
3) Owens Corning.
4) Or equal.
2. Insulation: ASTM C553; flexible, noncombustible blanket. a. 'K' ('Ksi') value: ASTM C518, 0.28 at 75 degrees F. b. Maximum service temperature: 250 degrees F.
c. Density: 1.5 lb./cu ft.
d. Maximum Velocity on Coated Air Side: 4,000 ft./min.
3. Adhesive
a. Waterproof fire-retardant type.
4. Liner Fasteners: Galvanized steel, impact applied with integral head.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions: Verify that field measurements, surfaces, substrates, and conditions are as required, and ready to receive Work.
1. Verify that piping has been tested before applying insulation materials.
2. Verify that ductwork has been tested before applying insulation materials.
3. Verify that surfaces are clean, foreign material removed, and dry.
B. Report in writing to Owner’s Representative prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected.
C. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the State.
3.2 INSTALLATION - DUCTWORK INSULATION
A. Install materials in accordance with manufacturer's instructions and ASHRAE 90.1.
SECTION 23 0713
DUCT INSULATION
City of Montebello 23 0713 - 4
Fire Stations 56
Renovation
B. Insulated ductwork conveying air below ambient temperature:
1. Provide insulation with vapor barrier jackets.
2. Finish with tape and vapor barrier jacket.
3. Continue insulation through walls, sleeves, hangers, and other duct penetrations.
4. Insulate entire system including fittings, joints, flanges, fire dampers, flexible connections, and expansion joints.
C. Insulated ductwork conveying air above ambient temperature:
1. Provide with or without standard vapor barrier jacket.
2. Insulate fittings and joints. Where service access is required, bevel and seal ends of insulation.
D. For ductwork exposed in finished spaces below 10 feet above finished floor, finish with aluminum jacket.
E. Duct and Plenum Liner Application:
1. Adhere insulation with adhesive for 100 percent coverage.
2. Secure insulation with mechanical liner fasteners. Refer to SMACNA Standards for spacing.
3. Seal and smooth joints.
4. Seal liner surface penetrations with adhesive.
5. Duct dimensions indicated are net inside dimensions required for air flow. Increase duct size to allow for insulation thickness.
3.3 CONSTRUCTION
A. Substituted insulation materials shall provide thermal resistance within 10 percent at normal conditions, as materials indicated.
3.4 DUCTWORK INSULATION SCHEDULE
A. Flexible Glass Fiber Duct Wrap Insulation Schedule:
DUCTWORK THICKNESS FINISH
INCH
Supply Ducts 1-1/2" Aluminized Film
Return Ducts 1-1/2" Aluminized Film
Outdoor Air Intake Ducts 1-1/2" Aluminized Film
B. Flexible Glass Fiber Duct Liner Insulation Schedule:
DUCTWORK THICKNESS FINISH
INCH
Plenums (Cooling System) 1" Black Pigmented, UL
Supply Ducts 1" Black Pigmented, UL
Return Ducts 1" Black Pigmented, UL
Outdoor Air Intake Ducts 1" Black Pigmented, UL
Ducts Exposed to Outdoors 2" Black Pigmented, UL
END OF SECTION
SECTION 23 3100
HVAC DUCTS AND CASINGS
City of Montebello 23 3100 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Metal ductwork.
2. Air turning devices.
3. Flexible duct connections.
4. Volume control dampers.
5. Duct cleaning.
B. Related Documents: The Contract Documents, as defined in Section 011000 - Summary of Work, apply to the Work of this Section. Additional requirements and information necessary to complete the Work of this Section may be found in other Documents.
C. Related Sections:
1. Section 23 0593 - Testing, Adjusting and Balancing for HVAC
2. Section 23 0713 - Duct Insulation or HVAC Insulation
3. Section 23 3713 - Diffusers Registers and Grilles
1.2 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM A 36 - Structural Steel.
2. ASTM A 90 - Weight of Coating on Zinc-Coated (Galvanized) Iron or Steel Articles.
3. ASTM A 167 - Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet and Strip.
4. ASTM A 480 - General Requirements for Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet and Strip.
5. ASTM A 653 - Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy Coated (Galvannealed) by the Hot-Dip Process.
6. ASTM A 568 Steel, Sheet, Carbon, and High-Strength, Low-Alloy, Hot-Rolled and Cold- Rolled.
B. American Welding Society (AWS):
1. AWS D9.1 - Welding of Sheet Metal.
C. National Fire Protection Association (NFPA):
1. NFPA 90A - Installation of Air Conditioning and Ventilating Systems.
2. NFPA 90B - Installation of Warm Air Heating and Air Conditioning Systems.
3. NFPA 91 - Installation of Blower and Exhaust Systems for Dust, Stock and Vapor Removal or Conveying.
4. NFPA 96 - Installing of Equipment for the Removal of Smoke and Grease-Laden Vapors from Commercial Cooking Equipment.
D. Sheet Metal and Air Conditioning Contractors National Association (SMACNA):
1. SMACNA - HVAC Air Duct Leakage Test Manual.
2. SMACNA - HVAC Duct Construction Standards - Metal and Flexible.
E. Underwriters Laboratories, Inc. (UL):
1. UL 181 - Factory-Made Air Ducts and Connectors.
SECTION 23 3100
HVAC DUCTS AND CASINGS
City of Montebello 23 3100 - 2
Fire Stations 56
Renovation
1.3 SYSTEM DESCRIPTION
A. Performance Requirements: No variation of duct configuration or sizes permitted except by written permission. Size round ducts installed in place of rectangular ducts in accordance with ASHRAE table of equivalent rectangular and round ducts.
1.4 SUBMITTALS
A. Division 1 - Submittal Procedures: Procedures for submittals.
1. Product Data:
a. Duct materials, duct liner, duct connectors, and flexible duct. b. Factory or shop manufactured assemblies including volume control dampers.
Include electrical characteristics and connection requirements.
2. Project Record Documents: Accurately record the following:
a. Actual locations of ducts and duct fittings.
b. Record changes in fitting location and type.
c. Show additional fittings used.
d. Actual locations of access doors, test holes, and fire dampers.
1.5 QUALITY ASSURANCE
A. Perform Work in accordance with SMACNA - HVAC Duct Construction Standards - Metal and Flexible.
B. Qualifications:
1. Manufacturer: Company specializing in manufacturing Products specified with minimum 5 years documented experience.
2. Installer: Company specializing in performing the Work of this Section with minimum 5 years documented experience.
C. Regulatory Requirements: Construct ductwork to NFPA 90A. NFPA 90B, and NFPA 96 standards.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Section 01 6000 - Product Requirements: Transport, handle, store, and protect Products.
B. Protect dampers from damage to operating linkages and blades.
1.7 PROJECT CONDITIONS OR SITE CONDITIONS
A. Jobsite Requirements:
1. Do not install duct sealants when temperatures are less than those recommended by sealant manufacturers.
2. Maintain temperatures during and after installation of duct sealants.
1.8 ENVIRONMENTAL REQUIREMENTS
A. Environmental Impact:
SECTION 23 3100
HVAC DUCTS AND CASINGS
City of Montebello 23 3100 - 3
Fire Stations 56
Renovation
1. Indoor Air Quality: Install insulation so that unfaced fiberglass and mineral fiber insulation are not in the interior of the ductwork.
PART 2 - PRODUCTS
2.1 DUCTS
A. Galvanized Steel Ducts: ASTM A653 having zinc coating in conformance with ASTM A90.
B. Steel Ducts: ASTM A569 and A568.
C. Flexible Ducts:
1. Manufacturers:
a. Anco Products Inc.
b. Hart & Cooley.
c. Tuttle & Bailey.
d. Or equal.
2. UL Labeled, black polymer film supported by helically wound spring steel wire.
3. Pressure Rating: 4 inches WG positive and 0.5 inches WG negative.
4. Maximum Velocity: 4000 fpm.
5. Temperature Range: -20 degrees F to 175 degrees.
D. Insulated Flexible Ducts:
1. Manufacturers:
a. Anco Products Inc.
b. Hart & Cooley.
c. Tuttle & Bailey
d. Or equal.
2. Black polymer film supported by helically wound spring steel wire; fiberglass insulation; aluminized vapor barrier film.
3. Pressure Rating: 4 inches WG positive and 0.5 inches WG negative.
4. Maximum Velocity: 4000 fpm.
5. Temperature Range: -20 degrees F to 175 degrees F.
E. Stainless Steel Ducts: ASTM A 167, Type 304.
F. Fasteners: Rivets, bolts, or sheet metal screws.
G. Sealant:
1. Manufacturers:
a. Duro Dyne Corporation, Farmingdale, NY (800) 899-3876. b. H.B. Fuller Co, St. Paul, MN (888) 423-8553.
c. Hardcast, Inc, Wylie, TX (800) 527-7092.
d. Or equal.
2. Non-hardening, water resistant, fire resistive, compatible with mating materials; liquid used alone or with tape, or heavy mastic.
H. Hanger Rod: ASTM A36; steel threaded both ends, threaded one end, or continuously threaded.
2.2 AIR TURNING DEVICES/EXTRACTORS
A. Manufacturers:
SECTION 23 3100
HVAC DUCTS AND CASINGS
City of Montebello 23 3100 - 4
Fire Stations 56
Renovation
1. Semco, Inc, Columbia, MO (888) 473-6264.
2. Metal-Fab, Inc, Wichita, KS (800) 835-2830.
3. United McGill Corp, Groveport, OH (614) 836-9981.
4. Or equal.
B. Multi-blade device with blades aligned in short dimension; steel or aluminum construction; with individually adjustable blades, mounting straps.
2.3 VOLUME CONTROL DAMPERS.
A. Manufacturers:
1. Louvers and Dampers, Inc, Florence, KY (606) 647-2299.
2. Prefco Products, Inc, Buckingham, PA (800) 437-6653.
3. Ruskin Manufacturing, Kansas City, MO (816) 761-7476.
4. Or equal.
B. Fabricate in accordance with SMACNA HVAC Duct Construction Standards - Metal and Flexible, and as indicated.
C. Single Blade Dampers: Fabricate for duct sizes up to 6 x 30 inch.
D. Multi-Blade Damper: Fabricate of opposed blade pattern with maximum blade sizes 8 x 72 inch.
Assemble center and edge crimped blades in prime coated or galvanized channel frame with suitable hardware.
E. End Bearings: Except in round ductwork 12 inches and smaller, provide end bearings. On multiple blade dampers, provide oil-impregnated nylon or sintered bronze bearings.
F. Quadrants:
1. Provide locking, indicating quadrant regulators on single and multi-blade dampers.
2. On insulated ducts mount quadrant regulators on stand-off mounting brackets, bases, or adapters.
3. Where rod lengths exceed 30 inches provide regulator at both ends.
2.4 DUCTWORK FABRICATION
A. Fabricate and support in accordance with SMACNA HVAC Duct Construction Standards - Metal and Flexible, and as indicated. Provide duct material, gages, reinforcing, and sealing for operating pressures indicated.
B. Construct T's, bends, and elbows with radius of not less than 1-1/2 times width of duct on centerline. Where not possible and where rectangular elbows are used, provide turning vanes.
C. Increase duct sizes gradually, not exceeding 15 degrees divergence wherever possible; maximum 30 degrees divergence upstream of equipment and 45 degrees convergence downstream.
PART 3 - EXECUTION
3.1 EXAMINATION
SECTION 23 3100
HVAC DUCTS AND CASINGS
City of Montebello 23 3100 - 5
Fire Stations 56
Renovation
A. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.
1. Verify that electric power is available and of the correct characteristics.
B. Report in writing to State Representative prevailing conditions that will adversely affect satisfactory execution of the Work of this Section. Do not proceed with Work until unsatisfactory conditions have been corrected.
C. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the State.
3.2 INSTALLATION - DUCTWORK
A. Install in accordance with manufacturer's instructions.
B. Install and seal ducts in accordance with SMACNA HVAC Duct Construction Standards - Metal and Flexible.
C. Duct Sizes are inside clear dimensions. For lined ducts, maintain sizes inside lining.
D. Provide openings in ductwork where required to accommodate thermometers and controllers.
Provide pilot tube openings where required for testing of systems, complete with metal can with spring device or screw to ensure against air leakage. Where openings are provided in insulated ductwork, install insulation material inside a metal ring.
E. Locate ducts with sufficient space around equipment to allow normal operating and maintenance activities.
F. Use crimp joints with or without bead for joining round duct sizes 8 inch and smaller with crimp in direction of air flow.
G. Use double nuts and lock washers on threaded rod supports.
H. Connect diffusers or light troffer boots to low pressure ducts directly or with 5 feet maximum length of flexible duct held in place with strap or clamp and tape.
I. Connect flexible ducts to metal ducts with draw bands plus tape.
J. During construction provide temporary closures of metal or taped polyethylene on open ductwork to prevent construction dust from entering ductwork system.
K. Install so that unfaced fiberglass and mineral fiber insulation are not in the interior of the ductwork.
3.3 INSTALLATION - DUCTWORK ACCESSORIES
A. Install accessories in accordance with manufacturer's instructions, NFPA 90A, and follow SMACNA HVAC Duct Construction Standards - Metal and Flexible.
B. Provide balancing dampers at points on supply, return, and exhaust systems where branches are taken from larger ducts as required for air balancing. Install minimum 2 duct widths from duct take-off.
C. Use splitter dampers only where indicated.
SECTION 23 3100
HVAC DUCTS AND CASINGS
City of Montebello 23 3100 - 6
Fire Stations 56
Renovation
D. Provide balancing dampers on duct take-off to diffusers, grilles, and registers, regardless of whether dampers are specified as part of the diffuser, grille, or register assembly.
3.4 CLEANING
A. Clean duct system and force air at high velocity through duct to remove accumulated dust. To obtain sufficient air, clean half the system at a time. Protect equipment which may be harmed by excessive dirt with temporary filters, or bypass during cleaning.
END OF SECTION
SECTION 23 3200
AIR DUCT CLEANING
City of Montebello 23 3200 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 QUALIFICATION OF THE HVAC SYSTEM CLEANING CONTRACTOR A. Membership: The HVAC system cleaning contractor shall be a certified member of the National Air Duct Cleaners Association (NADCA) or shall maintain membership in a nationally recognized non-profit industry organization dedicated to the cleaning of HVAC systems.
B. Certification: The HVAC system cleaning contractor shall have a minimum of one (1) Air System Cleaning Specialist (ASCS) certified by NADCA on a full-time basis, or shall have staff certified by a nationally recognized certification program and organization dedicated to the cleaning of HVAC systems.
C. Supervisor Qualifications: A person certified as an ASCS by NADCA or maintaining an equivalent certification by a nationally recognized program and organization, shall be responsible for the total work herein specified.
D. Experience: The HVAC system cleaning contractor shall submit records of experience in the field of HVAC system cleaning as requested by the Owner.
E. Equipment, Materials and Labor: The HVAC system cleaning contractor shall possess and furnish all necessary equipment, materials and labor to adequately perform the specified services.
1. The contractor shall assure that its employees have received safety equipment training, medical surveillance programs, individual health protection measures, and manufacturer=s product and material safety data sheets (MSDS) as required for the work by the U.S.
Occupational Safety and Health Administration, and as described by this specification. For work performed in countries outside of the USA, contractors should comply with applicable national safety codes and standards.
2. The contractor shall always maintain a copy of all current MSDS documentation and safety certifications at the site, as well as comply with all other site documentation requirements of applicable OSHA programs and this specification.
3. Contractor shall submit to the Owner all Material Safety Data Sheets (MSDS) for all chemical products proposed to be used in the cleaning process.
F. Licensing: The HVAC system cleaning contractor shall provide proof of maintaining the proper license(s), if any, as required to do work in this state. Contractor shall comply with all Federal, state and local rules, regulations, and licensing requirements.
1.2 STANDARDS
A. NADCA Standards: The HVAC system cleaning contractor shall perform the services specified here in accordance with the current published standards of the National Air Duct Cleaners Association (NADCA).
1. All terms in this specification shall have their meaning defined as stated in the NADCA Standards.
2. NADCA Standards must be followed with no modifications or deviations being allowed.
B. Applicable Standards and Publications: The following current standards and publications of the issues currently in effect form a part of this specification to the extent indicated by any reference thereto:
SECTION 23 3200
AIR DUCT CLEANING
City of Montebello 23 3200 - 2
Fire Stations 56
Renovation
1. National Air Duct Cleaners Association (NADCA): Assessment, Cleaning & Restoration of HVAC Systems (ACR 2021)
2. National Air Duct Cleaners Association (NADCA): Understanding Microbial Contamination in HVAC Systems,@ 1996.
3. National Air Duct Cleaners Association (NADCA): Introduction to HVAC System Cleaning Services,@ 2004.
4. National Air Duct Cleaners Association (NADCA): Standard 05 Requirements for the Installation of Service Openings in HVAC Systems,@ 2004.
5. Underwriters = Laboratories (UL): UL Standard 181.
6. American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE):
Standard 62-89, Ventilation for Acceptable Indoor Air Quality@.
7. Environmental Protection Agency (EPA): Building Air Quality, @ December 1991.
8. Sheet Metal and Air Conditioning Contractors = National Association (SMACNA): HVAC Duct Construction Standards - Metal and Flexible,@ 2004.
9. North American Insulation Manufacturers Association (NAIMA): Cleaning Fibrous Glass Insulated Air Duct Systems,@ 2007.
PART 2 - HVAC SYSTEM CLEANING SPECIFICATIONS AND REQUIREMENTS
2.1 SCOPE OF WORK
A. Scope: This section defines the minimum requirements necessary to render HVAC components clean, and to verify the cleanliness through inspection and/or testing in accordance with items specified herein and applicable NADCA Standards.
B. The Contractor shall be responsible for the removal of visible surface contaminants and deposits from within the HVAC system in strict accordance with these specifications.
C. The HVAC system includes any interior surface of the facility’s air distribution system for conditioned spaces and/or occupied zones. This includes the entire heating, air-conditioning and ventilation system from the points where the air enters the system to the points where the air is discharged from the system. The return air grilles, return air ducts to the air handling unit (AHU), the interior surfaces of the AHU, mixing box, coil compartment, condensate drain pans, humidifiers and dehumidifiers, supply air ducts, fans, fan housing, fan blades, air wash systems, spray eliminators, turning vanes, filters, filter housings, reheat coils, and supply diffusers are all considered part of the HVAC system. The HVAC system may also include other components such as dedicated exhaust and ventilation components and make-up air systems.
2.2 HVAC SYSTEM COMPONENT INSPECTIONS AND SITE PREPARATIONS A. HVAC System Component Inspections: Prior to the commencement of any cleaning work, the HVAC system cleaning contractor shall perform a visual inspection of the HVAC system to determine appropriate methods, tools, and equipment required to satisfactorily complete this project. The cleanliness inspection should include air handling units and representative areas of the HVAC system components and ductwork. In HVAC systems that include multiple air handling units, a representative sample of the units should be inspected. The cleanliness inspection shall be conducted without negatively impacting the indoor environment through excessive disruption of settled dust, microbial amplification or other debris. In cases where contamination is suspected, and/or in sensitive environments where even small amounts of contaminant may be of concern, environmental engineering control measures should be implemented.
1. Damaged system components found during the inspection shall be documented and brought to the attention of the Owner.
SECTION 23 3200
AIR DUCT CLEANING
City of Montebello 23 3200 - 3
Fire Stations 56
Renovation
B. Site Evaluation and Preparations: Contractor shall conduct a site evaluation, and establish a specific, coordinated plan which details how each area of the building will be protected during the various phrases of the project.
C. Inspector Qualifications: Qualified personnel should perform the HVAC cleanliness inspection to determine the need for cleaning, at minimum, such personnel should have an understanding of HVAC system design, and experience in utilizing accepted indoor environmental sampling practices, current industry HVAC cleaning procedures, and applicable industry standards.
2.3 GENERAL HVAC SYSTEM CLEANING REQUIREMENTS
A. Containment: Debris removed during cleaning shall be collected and precautions must be taken to ensure that Debris is not otherwise dispersed outside the HVAC system during the cleaning process.
B. Particulate Collection: Where the Particulate Collection Equipment is exhausting inside the building, HEPA filtration with 99.97% collection efficiency for 0.3-micron size (or greater) particles shall be used. When the Particulate Collection Equipment is exhausting outside the building, Mechanical Cleaning operations shall be undertaken only with Particulate Collection Equipment in place, including adequate filtration to contain Debris removed from the HVAC system. When the Particulate Collection Equipment is exhausting outside the building, precautions shall be taken to locate the equipment down wind and away from all air intakes and other points of entry into the building.
C. Controlling Odors: Measures shall be employed to control odors and/or mist vapors during the cleaning process.
D. Component Cleaning: Cleaning methods shall be employed such that all HVAC system components must be Visibly Clean as defined in applicable standards (see NADCA Standards).
Upon completion, all components must be returned to those settings recorded just prior to cleaning operations.
E. Air-Volume Control Devices: Dampers and any air-directional mechanical devices inside the HVAC system must have their position marked prior to cleaning and, upon completion, must be restored to their marked position.
F. Service Openings: The contractor shall utilize service openings, as required for proper cleaning, at various points of the HVAC system for physical and mechanical entry, and inspection.
1. Contractor shall utilize the existing service openings already installed in the HVAC system where possible.
2. Other openings shall be created where needed and they must be created so they can be sealed in accordance with industry codes and standards.
3. Closures must not significantly hinder, restrict, or alter the airflow within the system.
4. Closures must be properly insulated to prevent heat loss/gain or condensation on surfaces within the system.
5. Openings must not compromise the structural integrity of the system.
6. Construction techniques used in the creation of openings should conform to requirements of applicable building and fire codes, and applicable NFPA, SMACNA and NADCA Standards.
7. Cutting service openings into flexible duct is not permitted. Flexible duct shall be disconnected at the ends as needed for proper cleaning and inspection.
8. Rigid fiber glass duct systems shall be resealed in accordance with NAIMA recommended practices. Only closure techniques that comply with UL Standard 181 or UL Standard 181a are suitable for fiber glass duct system closures.
SECTION 23 3200
AIR DUCT CLEANING
City of Montebello 23 3200 - 4
Fire Stations 56
Renovation
9. All service openings capable of being re-opened for future inspection or remediation shall be clearly marked and shall have their location reported to the Owner in project report documents.
G. Ceiling sections (tile): The contractor may remove and reinstall ceiling sections to gain access to HVAC systems during the cleaning process.
H. Air distribution devices (registers, grilles & diffusers): The contractor shall clean all air distribution devices.
I. Air handling units, terminal units (VAV, Dual duct boxes, etc.), blowers and exhaust fans: The contractor shall insure that supply, return, and exhaust fans and blowers are thoroughly cleaned.
Areas to be cleaned include blowers, fan housings, plenums (except ceiling supply and return plenums), scrolls, blades, or vanes, shafts, baffles, dampers and drive assembles. All visible surface contamination deposits shall be removed in accordance with NADCA Standards.
Contractor shall:
1. Clean all air handling units (AHU) internal surfaces, components and condensate collectors and drains.
2. Assure that a suitable operative drainage system is in place prior to beginning wash down procedures.
3. Clean all coils and related components, including evaporator fins.
J. Duct Systems. Contractor shall:
1. Create service openings in the system as necessary in order to accommodate cleaning of otherwise inaccessible areas.
2. Mechanically clean all duct systems to remove all visible contaminants, such that the systems can pass Cleaning Verification Tests (see NADCA Standards).
2.4 HEALTH AND SAFETY
A. Safety Standards: Cleaning contractors shall comply with applicable federal, state, and local requirements for protecting the safety of the contractor=s employees, building occupants, and the environment. All applicable standards of the Occupational Safety and Health Administration (OSHA) shall be followed when working in accordance with this specification.
B. Occupant Safety: No processes or materials shall be employed in such a manner that they will introduce additional hazards into occupied spaces.
C. Disposal of Debris: All Debris removed from the HVAC System shall be disposed of in accordance with applicable federal, state, and local requirements.
2.5 MECHANICAL CLEANING METHODOLOGY
A. Source Removal Cleaning Methods: The HVAC system shall be cleaned using Source Removal mechanical cleaning methods designed to extract contaminants from within the HVAC system and safely remove contaminants from the facility. It is the contractor =s responsibility to select Source Removal methods that will render the HVAC system Visible Clean and capable of passing cleaning verification methods (See applicable NADCA Standards) and other specified test, in accordance with all general requirements. No cleaning method, or combination of methods, shall be used which could potentially damage components of the HVAC system or negatively alter the integrity of the system.
1. All methods used shall incorporate the use of vacuum collection devices that are operated continuously during cleaning. A vacuum device shall be connected to the downstream end of the section being cleaned through a predetermined opening. The vacuum collection
SECTION 23 3200
AIR DUCT CLEANING
City of Montebello 23 3200 - 5
Fire Stations 56
Renovation
device must be of enough power to render all areas being cleaned under negative pressure, such that containment of debris and the protection of the indoor environment are assured.
2. All vacuum devices exhausting air inside the building shall be equipped with HEPA filters (minimum efficiency), including hand-held vacuums and wet vacuums.
3. All vacuum devices exhausting air outside the facility shall be equipped with Particulate Collection including adequate filtration to contain Debris removed from the HVAC system.
Such devices shall exhaust in a manner that will not allow contaminants to re-enter the facility. Release of debris outdoors must not violate any outdoor environmental standards, codes or regulations.
4. All methods require mechanical agitation devices to dislodge debris adhered to interior HVAC system surfaces, such that debris may be safely conveyed to vacuum collection devices. Acceptable methods will include those, which will not potentially damage the integrity of the ductwork, nor damage porous surface materials such as liners inside the ductwork or system components.
B. Methods of Cleaning Fibrous Glass Insulated Components
1. Fibrous glass thermal or acoustical insulation elements present in any equipment or ductwork shall be thoroughly cleaned with HEPA vacuuming equipment, while the HVAC system is under constant negative pressure, and not permitted to get wet in accordance with applicable NADCA and NAIMA standards and recommendations.
2. Cleaning methods used shall not cause damage to fibrous glass components and will render the system capable of passing Cleaning Verification Tests (see NADCA Standards).
C. Damaged Fibrous Glass Material
1. Evidence of damage: If there is any evidence of damage, deterioration, delaminating, friable material, mold or fungus growth, or moisture such that fibrous glass materials cannot be restored by cleaning or resurfacing with an acceptable insulation repair coating, they shall be identified for replacement.
2. Replacement: When requested or specified, Contractor must be capable of remediating exposed damaged insulation in air handlers and/or ductwork requiring replacement.
3. Replacement material: In the event fiber glass materials must be replaced, all materials shall conform to applicable industry codes and standards, including those of UL and SMACNA. Replacement of damaged insulation is not covered by this specification.
D. Cleaning of coils
1. Any cleaning method may be used which will render the Coil Visibly Clean and capable of passing Coil Cleaning Verification (see applicable NADCA Standards). Coil drain pans shall be subject to Non-Porous Surfaces Cleaning Verification. The drain for the condensate drains pan shall be operational. Cleaning methods shall not cause any appreciable damage to, displacement of, inhibit heat transfer, or erosion of the coil surface or fins, and shall conform to coil manufacturer recommendations when available. Coils shall be thoroughly rinsed with clean water to remove any latent residues.
E. Antimicrobial Agents and Coatings
1. Antimicrobial agents shall only be applied if active fungal growth is reasonably suspected, or where unacceptable levels of fungal contamination have been verified through testing.
2. Application of any antimicrobial agents used to control the growth of fungal or bacteriological contaminants shall be performed after the removal of surface deposits and debris.
3. When used, antimicrobial treatments and coatings shall be applied in strict accordance with the manufacturer=s written recommendations and EPA registration listing.
4. Antimicrobial coatings shall be applied according to the manufacturer =s written instructions. Coatings shall be sprayed directly onto interior ductwork surfaces, rather than Afogged@ downstream onto surfaces.
SECTION 23 3200
AIR DUCT CLEANING
City of Montebello 23 3200 - 6
Fire Stations 56
Renovation
PART 3 - EXECUTION
3.1 CLEANLINESS VERIFICATION
A. General: Verification of HVAC System cleanliness will be determined after mechanical cleaning and before the application of any treatment or introduction of any treatment-related substance to the HVAC system, including biocidal agents and coatings.
B. Visual Inspection: The HVAC system shall be inspected visually to ensure that no visible contaminants are present.
1. If no contaminants are evident through visual inspection, the HVAC system shall be considered clean; however, the Owner reserves the right to further verify system cleanliness through Surface Comparison Testing or the NADCA vacuum test specified in the NADCA standards.
2. If visible contaminants are evident through visual inspection, those portions of the system where contaminants are visible shall be re-cleaned and subjected to re-inspection for cleanliness.
3. NADCA vacuum test analysis should be performed by a qualified third party experienced in testing of this nature.
C. Verification of Coil Cleaning
1. Cleaning must restore the coil pressure drop to within 10 percent of the pressure drop measured when the coil was first installed. If the original pressure drop is not known, the coil will be considered clean only if the coil is free of foreign matter and chemical residue, based on a thorough visual inspection (see NADCA Standards).
3.2 PRE-EXISTING SYSTEM DAMAGE
A. Contractor is not responsible for problems resulting from prior inappropriate or careless cleaning techniques of others.
3.3 POST-PROJECT REPORT
A. At the conclusion of the project, the Contractor shall provide a report to the Owner indicating the following:
1. Success of the cleaning project, as verified through visual inspection and/or gravimetric analysis.
2. Areas of the system found to be damaged and/or in need of repair.
END OF SECTION
SECTION 23 3713
DIFFUSERS, REGISTERS AND GRILLES
City of Montebello 23 3713 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Diffusers.
2. Registers/grilles.
B. Related Sections:
1. Section 09 9123 – Interior Painting: Painting of ductwork visible behind outlets and inlets.
1.2 REFERENCES
A. Air Diffusion Council (ADC):
1. ADC 1062 - Certification, Rating and Test Manual.
B. Air Movement and Control Association (AMCA):
1. AMCA 500 - Test Method for Louvers, Dampers and Shutters.
C. Air Conditioning and Refrigeration Institute (ARI):
1. ARI 650 - Air Outlets and Inlets.
D. American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE):
1. ASHRAE 70 - Method of Testing for Rating the Air Flow Performance of Outlets and Inlets.
E. Sheet Metal and Air Conditioning Contractors National Association (SMACNA):
1. SMACNA - HVAC Duct Construction Standard - Metal and Flexible.
F. National Fire Protection Association (NFPA):
1. NFPA 70 - National Electrical Code.
2. NFPA 90A - Installation of Air Conditioning and Ventilating Systems.
1.3 SUBMITTALS
A. Procedures for submittals.
1. Product Data: Provide data for equipment required for this project. Review outlets and inlets as to size, finish, and type of mounting prior to submission. Submit schedule of outlets and inlets showing type, size, location, application, and noise level.
1.4 QUALITY ASSURANCE
A. Test and rate air outlet and inlet performance in accordance with ADC Equipment Test Code 1062 and ASHRAE 70.
B. Test and rate louver performance in accordance with AMCA 500.
C. Qualifications
SECTION 23 3713
DIFFUSERS, REGISTERS AND GRILLES
City of Montebello 23 3713 - 2
Fire Stations 56
Renovation
1. Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years documented experience.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Subject to compliance with project requirements, manufacturers offering Products which may be incorporated in the Work include the following:
1. Titus.
2. Ruskin.
3. Tuttle & Bailey
4. Or equal.
2.2 SQUARE CEILING DIFFUSERS (TITUS MCD)
A. Type: Square, fabricated assemblies, modular core diffuser to discharge air in adjustable patterns.
B. Frame: Surface mount, Snap-in Spline type as scheduled on plans.
C. Fabrication: Steel or Aluminum with baked enamel, “off-white” finish.
D. Accessories: Opposed blade damper adjustable for removal of Core. Only if specifically shown on drawings.
E. Insulation: Back plate covered with glass fiber insulation with an aluminum foil vapor barrier to prevent harmful effects of condensation.
2.3 RETURN GRILLE (350RL)
A. Type: Streamlined blades, 3/4-inch minimum depth, 3/4-inch maximum spacing, 35-degree deflection blades, with long blades front.
B. Frame: 1-1/4-inch margin with concealed mounting.
C. Fabrication: Steel with 20 gage minimum frames and 22 gage minimum blades, steel, and aluminum with 20 gage minimum frame, or aluminum extrusions, with factory baked enamel, “off-white” finish.
D. Damper: Integral, gang-operated, opposed blade type with protruding tab operator, operable from face.
E. Insulation: Back plate covered with glass fiber insulation with an aluminum foil vapor barrier to prevent harmful effects of condensation.
2.4 EXHAUST REGISTERS (TITUS 350RL)
A. Type: Streamlined blades, 3/4-inch minimum depth, 3/4-inch maximum spacing, 35-degree deflection blades, with long blades front.
SECTION 23 3713
DIFFUSERS, REGISTERS AND GRILLES
City of Montebello 23 3713 - 3
Fire Stations 56
Renovation
B. Frame: 1-1/4-inch margin with concealed mounting.
C. Fabrication: Steel with 20 gage minimum frames and 22 gage minimum blades, steel, and aluminum with 20 gage minimum frame, or aluminum extrusions, with factory baked enamel, “off-white” finish.
D. Damper: Integral, gang-operated, opposed blade type with removable key operator, operable from face where not individually connected to exhaust fans.
E. Insulation: Back plate covered with glass fiber insulation with an aluminum foil vapor barrier to prevent harmful effects of condensation.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install in accordance with manufacturer's instructions.
B. Coordinate location of outlets and inlets with Architectural reflected ceiling plan and make necessary adjustments in position to conform with architectural features, symmetry, and electrical lighting arrangement.
C. Install diffusers to ductwork with airtight connection.
D. Provide balancing dampers on duct take-off to diffusers, and grilles and registers, despite whether dampers are specified as part of the diffuser, or grille and register assembly.
E. Paint ductwork visible behind air outlets and inlets matte black. Refer to Section 09 9123.
END OF SECTION
SECTION 26 0500
ELECTRICAL
City of Montebello 26 0500 - 1
Fire Stations 56
Renovation
PART 1 - GENERAL
1.1 SCOPE
A. Provide all electrical work for a complete and operable system as shown on the drawings and as specified in this section including, but not limited to the following:
1. Branch circuit-wiring system including wiring devices, wiring, conduit, pull boxes and equipment connections.
2. Lighting system including light fixtures, lamps, ballasts, required mounting hardware, and occupancy sensors.
3. Adjustment and test of the electrical work.
4. Guarantee.
1.2 QUALITY ASSURANCE
A. All products and equipment herein specified or indicated on the drawings shall be new with UL label and in compliance with the California Electrical Code, state and local codes.
Materials for similar use shall be of the same type and manufacture.
B. All work and materials shall be installed per the governing authorities. Nothing in the plans or specifications shall be deemed as permission to violate these codes or authorities and the Contractor shall be held responsible for any work, which is not accepted. Violations shown on the plans are to be brought to the attention of the Electrical Engineer before work is done.
1.3 SITE VISITATIONS: Prior to the submission of the bid, the Contractor shall visit the site and make a thorough examination of the existing conditions and thereby include allowances for this work in this bid.
1.4 PERMITS AND LICENSES: Contractor shall pay for and obtain all necessary permits, inspections, insurance and licenses required for the Electrical work. Deliver certificates for all permits and inspections to the Architect.
1.5 COORDINATION: Contractor to coordinate the Electrical work with other trades. Review drawings and specifications of all equipment requiring electrical connections prior to installation of the electrical system. Verify space, ventilation and clearances required to install electrical equipment. Exact locations of lights and wiring devices are shown on architectural drawings.
1.6 SUBMITTALS: Within thirty (30) days after award of contract, submit to the Architect six (6) sets of shop drawings consisting of product data sheets for light fixtures, receptacles, switches, plates, wiring devices, and material list. Submittals not to include substitutions or deviations from the materials or methods specified unless prior approval has been given in writing. Make all submittals at one time in booklet form.
1.7 SUBSTITUTIONS: Where manufacturer's name and catalog number are called out, the phrase "or approved equal" can be assumed except the burden of proving equality is on the bidder.
1.8 DRAWINGS: During progress of work maintain a record of changes made on plans and "as-built" locations of buried conduits and ducts. On completion, present a professionally done reproducible drawing to the Architect.
1.9 VERIFICATION OF DIMENSIONS: All scaled and figured dimensions are approximate and are given for estimating purposes only. Where apparatus and equipment have been taken from typical equipment of the class indicated and before proceeding with the work, the Contractor shall
SECTION 26 0500
ELECTRICAL
City of Montebello 26 0500 - 2
Fire Stations 56
Renovation
carefully check and verify all dimensions and sizes and shall assume all responsibility for the fitting of his materials and equipment to other parts of the equipment and to the structure.
1.10 LOCATION: Prior to rough-in, minor adjustments to outlet locations may be made without additional compensation.
1.11 PROTECTION OF FINISH: Fully protect all finished parts during the progress of the work and until final completion.
1.12 GUARANTEE: All electrical work and equipment (except lamps) shall be guaranteed for one year from the date of acceptance on Contractor's letterhead and turned over to the Owner at the completion and final acceptance of the job.
PART 2 - PRODUCTS
2.1 CIRCUIT BREAKERS: Circuit breakers shall be bolt-on molded-case type with thermal magnetic trips. Provide with rated voltage, frame size, number of poles and trip setting as shown. NEMA interrupting capacity shall be 10,000 AIC at 120/208 volts or series rated 65,000 AIC at 277/480 volts, unless otherwise noted. Match existing.
2.2 CONDUIT: Conduit shall be rigid steel galvanized IMC for underground, exposed up to +5'-0" or in damp locations. No running threads will be permitted. Galvanized EMT shall be used in dry concealed locations and exposed above +5'-0". EMT connectors shall be watertight compression type. Galvanized flexible conduit shall be used only for motor and fixture connections in lengths not to exceed 6'. Conduits penetrating the roof are to be flashed and counter flashed. PVC schedule 40 may be used under floor slabs or underground with ground wire. PVC underground to have 24-inch cover. Install fittings, special devices and material, which may be required for the proper installation of the conduit system.
2.3 CONDUCTORS: Conductors shall be 600-volt insulation type THHN/THWN copper. Conductors AWG #10 and smaller shall be solid, AWG #8 and larger to be stranded.
2.4 SPLICES: Splices on conductors #8 or smaller shall be Scotchlock spring connectors and for larger size cables use solderless connectors.
2.5 RECEPTACLES: Receptacles, 120-volt duplex grounding type, shall be specification grade 15- amp Leviton #5261-I. Where indicated WP install weatherproof gasket cover, mounted on FS box. Provide ground fault circuit interrupters where required by code. Dedicated receptacles shall be 20 amp, Leviton #5362-I.
2.6 LIGHT SWITCHES: Switches shall be toggle type specification grade 120/277 volts AC Leviton #1201-2I and #1203-2I for 3-way.
2.7 PLATES: Shall be stainless steel.
2.8 CHANNELS: Structural channels shall be by Kindorf, Kin-Line or Unistrut complete with all fittings, accessories, swivels, rods, etc. and installed to structural members as directed by the Structural Engineer.
2.9 LIGHTING FIXTURES: Furnish and install complete with lamps, ballasts and required mounting hardware. Prior to ordering fixtures, verify mounting methods and finishes. All fluorescent fixtures mounted in "T" bar ceilings to be independently suspended diagonally with 2 #10 steel wires.
Installations in fire-rated areas to be done according to code requirements. Recessed portions of fixture enclosures, other than at points of support, shall be spaced at least 1/2 inch from combustible material. Thermal insulation shall not be installed within 3 inches from the recessed fixture enclosure, wiring compartment, or ballast and shall not be so installed above the fixture as
SECTION 26 0500
ELECTRICAL
City of Montebello 26 0500 - 3
Fire Stations 56
Renovation
to entrap heat and prevent the free circulation of air unless the fixture is otherwise identified for installation within thermal insulation. For pendant mounted fixtures, align stems to ceiling with laser beams.
2.10 LAMPS: Lamps shall be as shown on the fixture schedule. Provide lamps suitable for the use intended. Fluorescent lamps shall be 32-watt energy saver G.E. F32T8 RS SPX35 or approved equal by Sylvania or Philips. Metal halide lamps to be coated. Provide minimum 100 hours of "burn-in" of all fluorescent lamps.
2.11 BALLASTS: Fluorescent ballasts shall be rapid start, in-rush current limiting, electronic premium type CBM certified and ETL approved, high power factor and of voltage required. Ballasts shall be Advance, Universal, Magnetek or Motorola. Ballasts shall be compatible with occupancy sensors. HID ballasts shall be UL listed for the source, wattage and position of the lamp provided.
2.12 GROUND FAULT CIRCUIT INTERRUPTER (GFCI): Provide GFCI circuit breakers or outlets according to the National Electrical Code Section 210 (2) and (3), 210-8, and such ground fault circuit interrupter protection may be provided for other circuits, locations and occupancies, and where used, will provide additional protection against line-to-ground shock hazards.
PART 3 - EXECUTION
3.1 GENERAL:
A. The Electrical Drawings, which constitute an integral part of this contract, serve as the working drawings and indicate the general layout of the electrical systems. Field verifications of locations on plans are directed by field conditions. Check the Architectural, Structural and Mechanical Plans to avert possible installation conflicts and include all resulting cost in the bid.
B. Discrepancies between different plans, between plans and actual field conditions, or between plans and specifications shall be promptly brought to the attention of the Electrical Engineer for clarification or decision. Appurtenances and wiring not specifically indicated or referred to, but which are common to complete and operable electrical systems, shall be included in the bid.
C. Each empty conduit shall include a pull cord. All pull cords shall have a minimum diameter of 1/4" and a minimum average tensile strength of 1100 pounds. It shall be yellow in color.
A contrasting tracer color may be included to identify the manufacturer. Flat braid is not acceptable.
3.2 INSTALLATION: Installation of materials and equipment shall be in strict accordance with manufacturer's recommendations, instructions, and industry standards, as indicated on the drawings and as specified herein. Provide all mounting facilities for securing or hanging fixtures, equipment and outlets to the satisfaction of the Engineer. Details shown on the plans are for the purpose of establishing the extent and general methods required. Provide all sleeves, inserts, expansion joints, vibration fitting, etc. Provide storage facilities and protect all work, materials and equipment from damage during process of work. Materials and equipment shall not be stored exposed to weather. Replace all damaged or defective work, materials and equipment without additional cost to the Owner.
3.3 CONDUIT AND WIRING: All conduit and wiring shall be installed concealed in walls, above ceilings and below floor slabs or exposed in accordance with applicable regulations and the Electrical Drawings. All penetrations of fire-rated walls or ceilings to be coordinated with Owner.
Conduit runs are shown diagrammatically. Exact routing and location of the equipment to be determined in the field.
SECTION 26 0500
ELECTRICAL
City of Montebello 26 0500 - 4
Fire Stations 56
Renovation
3.4 MOISTURE PROTECTION: Where required by regulations, all electrical devices in the spray radius of sprinklers shall be installed with weatherproof enclosures in compliance with these regulations.
3.5 GROUNDING: All metallic conduits, supports and enclosures shall be grounded in compliance with the National Electrical Code. Grounding bushings shall be used wherever conduits are required to be grounded.
3.6 TESTING: All new circuits shall be tested for short and open circuit to ground with a megger.
Resistance to ground shall be in compliance with the requirements of the National Electrical Code.
Furnish all necessary labor, instruments and equipment required for making tests to demonstrate that the operation of the system is in accordance with the intent of the contract documents. Also perform a complete "in service" operation of the entire electrical system to the full satisfaction of the Owner.
END OF SECTION
SECTION 26 0513
ELECTRICAL BASIC MATERIALS AND METHODS
City of Montebello 26 0513 - 1
Fire Stations 56
Renovation
PART 1 GENERAL
1.1 SUMMARY:Furnish materials and perform labor requ ired to execute this work indicated on the drawings, as specified, and as necessary to complete the Contract, including, but not limited to, these major items:
A. Examine all other sections for work related to those other sections and required to be included as work under this section.
B. Make arrangements with the Power and Telephone Companies for services of power and telephone systems, and pay all fees and charges levied by them. Notify utility companies when work under this section commences.
C. Telephone service, including conduits, backboards and grounding per Telephone Co.'s requirements.
D. Cable Television service, including conduits, cabinets, cabling and grounding as required by Cable Television Company.
E. Obtain all permits required from all agencies and make arrangements for all inspections required.
F. Complete power and lighting branch circuit wiring including junction boxes, pull boxes, outlet boxes, devices, cable supports, grounding equipment, materials, and equipment for a complete installation.
G. Lighting fixtures and lamps in fixtures see lighting fixtures schedule on drawings.
H. Complete line and low voltage wiring and connections of HVAC and plumbing equipment. Provide gutters, disconnect switches, fuses, relays, time switches, and all auxiliaries.
I. Power panelboards, transfer switches, feeders, conduit, pull boxes and all auxiliaries.
J. Wiring and connections to all electrically operated equipment and appliances as shown on the drawings.
K. Excavation, backfill, repaving and concrete work to complete the work under this Section.
L. Special grounding system complete, including ground rods, ground bars, cables and miscellaneous hardware.
M. Bakelite nameplates.
N. Temporary electrical service as needed for all trades during construction of project.
O. Conduit, with cables, for the Cable TV system as indicated, including boxes, cabinets, and miscellaneous hardware and finish plates.
P. Power for Smoke and Fire Detection System complete, including conduit, wiring, outlets, fittings and devices.
Q. Fire Alarm system complete with control panel, annunciator and including conduit,
SECTION 26 0513
ELECTRICAL BASIC MATERIALS AND METHODS
City of Montebello 26 0513 - 2
Fire Stations 56
Renovation
detectors, devices as indicated and required, wiring, outlets, fittings.
R. Construction permits.
S. Record and "as-built" drawings.
T. Certificates and warranties.
U. Owner manuals.
V. Perform all other work necessary for the complete installation of all electrical work as herein specified. Refer to the approved electrical plan set for details.
PART 2 - MATERIALS
2.1 CONDUIT AND RACEWAYS
A. All shall be provided with fittings and accessories approved for purpose and equal in all respects to raceway.
B. Rigid steel conduit shall be hot-dipped galvanized and comply with U.S. Standard UL6 and ANSI Standard C80.1.
C. Intermediate steel conduit shall be hot-dipped galvanized and comply with U.S.
Standard 1242.
D. Electrical metallic tubing (EMT) shall be galvanized on the outside and coated on the inside with a hard-smooth lacquer finish. EMT fittings shall be steel compression gland.
EMT shall comply with U.L. 797 and ANSI C80-3.
E. Flexible metallic conduit shall be galvanized steel with steel fittings. Liquid and moisture tight conduit shall be American Brass with Appleton "ST" connectors or acceptable equal. Flexible conduit shall be only used in concealed areas in walls for connection to recessed light fixtures, motors and transformers.
F. Plastic conduit shall be polyvinyl chloride (PVC) Schedule 40 for direct burial or Type I for concrete encased, for use with 90oC. Conduits as manufactured by Carlon, Kraylon, Borg Wagner, Stauffer, Triangle or acceptable equal.
G. Surface metal raceway shall be Wiremold or Walker-Parkersburg. Raceways and fittings shall be of one manufacturer and designed for use together.
H. Wireways shall be hinged cover or screw cover complete with all necessary manufactured fittings which shall be of one manufacturer. Wireway shall be Square D square duct or approved equal by G.E., ITE.
1. Plastic-coated conduit shall be rigid galvanized steel conduit having a 0.030" minimum thick factory-bonded PVC jacket, using pre-jacketed couplings as manufactured by Pittsburgh Robroy, Plastic Applicator, Occidental or approved equal.
2.2 WIRE AND CABLES
A. All shall be new. All conductors #8 AWG and larger, shall be stranded. Color code all conductors as specified and as prescribed by NEC unless specified otherwise.
SECTION 26 0513
ELECTRICAL BASIC MATERIALS AND METHODS
City of Montebello 26 0513 - 3
Fire Stations 56
Renovation
B. Secondary voltage (600 volt or below) cables and wires shall be copper, unless otherwise indicated on drawings, single conductor rated 600 volts conforming to or exceeding IPCEA Specifications and shall be as follows:
1. In sizes #1/0 AWG to 4/0: Cross-linked polyethylene insulation type XHHW (75 - 90o) or THWN.
2. In sizes 250 MCM and larger: Type RHW/USE or THWN.
3. In sizes #1 AWG and smaller: All conductors shall have heat/moisture resistant thermoplastic insulation type THW or THWN (75oC), except as follows:
a. Where conduit temperature will exceed 100 oF, use type THHN (90oC).
Type XHHW (90oC) permissible in dry locations.
b. In 120-volt incandescent fixtures, type AF (150 oC). c. In wireways of fluorescent lighting fixtures types THW-MTW (90 oC). d. Handling cord drops and cord connections: Type "SO" cord.
4. Grounding Conductors: Copper Type TW with green integrally-colored insulation of bare-medium-hard-drawn copper.
5. General Electric, Okonite, Rome or General Cable products are acceptable.
6. Low Voltage Conductors: Jacketed, approved type, with low smoke producing characteristics.
2.3 WIRING DEVICES
A. Wall (Local) Switches: Totally enclosed, AC rated, silent type ivory finish or other finishes on dark colored walls as selected by the Owner. Switches on emergency circuits shall be red. All switch mounting straps shall be metal and offer self-grounding or be equipped with a green, hex-head ground screw. Numbers used below are those of Hubbell. Equivalent Leviton, Arrow-Hart, Bryant, P & S, Sierra or G.E. are acceptable.
(1) Single-Pole Switches #RSD115I 15 amps 120 volts
(2) Single-Pole Combination #RCD101I 15amps120 volts
(3) Single-Pole Combination #RCD111I 15amps120 volts
Three-Way Switches #RSD315I 15 amps 120 volts
B. Occupancy sensor switch shall be Hubbell RMS140I passive infrared sensor or equal by Leviton or Arrow Hart.
C. Receptacles:
1. Duplex receptacles shall be specification grade, Tamper resistance, NEMA 5- 20R configuration. They shall be capable of being side or back wired, with clamp type terminals for back wiring and have a metal mounting strap with self- grounding and a green, hex-head grounding termination screw. The grounding
SECTION 26 0513
ELECTRICAL BASIC MATERIALS AND METHODS
City of Montebello 26 0513 - 4
Fire Stations 56
Renovation
blades shall be aligned in such a manner that they are parallel to the longitudinal plane of the receptacle. Numbers used below are those of Hubbell. Equivalent Leviton, Arrow-Hart, Bryant, P&S, Sierra, or GE are acceptable.
Duplex 20A Ivory color #BR20ITR
GFI Duplex 20A Ivory color #GF20IL
Single Receptacle: # RR201I
2. All receptacles shall have ivory finish.
3. Receptacles on emergency circuits shall be red, except for isolated ground receptacles on emergency circuits, which shall be orange with red cover plates.
D. Device Cover Plates: matching device cover plates by Hubbell, Smooth nylon with Ivory finish unless otherwise selected by the Owner. Outlets in mechanical/electrical/utility rooms, and garage shall have stamped steel cover plates.
Color of device plates shall be coordinated with the Owner. Red plates for receptacles on emergency circuits. Weatherproof cover: Hubbell # HBL5221 E. Telephone or Data Jacks: shall be RJ45 jacks with Hubbell frame and multimedia ivory face plate.
F. Television outlet jacks shall be recessed gold “F” connector Hubbell SFGRFEI with Hubbell frame and multimedia ivory face plate.
G. Special Purpose Receptacles: Provide where shown on drawings. Specification grade, standard color, and of the appropriate code and NEMA configuration to match the supply circuit and load involved. Provide proper grounding through receptacle for equipment.
2.4 OUTLET BOXES, JUNCTION BOXES AND PULL BOXES
A. Outlet Boxes: Hot-dipped galvanized or sherardized of required size, 4" sq. minimum or octagonal and of depth required for flush mounted devices and lighting fixtures. Cast- type with gasketed covers for surface-mounted devices. All outlets for exterior application shall be cast, weatherproof type with gasket and cast cover plate.
B. Junction and Pull Boxes: Use outlet boxes as junction boxes wherever possible.
Larger junction and pull boxes over 12" in any dimension shall be fabricated from sheet steel, sized according to code, and have screw-on covers. All junction boxes shall be accessible.
2.5 WIRE CONNECTORS
A. For wires size #10 AWG and smaller, use Scotchlok or Ideal insulated pressure type (with live spring) rated 105oC, 600 volts, for building wiring and 1000 volt in signs or fixtures.
B. For wires size #8 AWG and larger, T & B or equivalent compression type with 3M #33 tape insulation.
2.6 CONDUIT HANGERS
A. Galvanized steel with special accessories for purpose and adequate to support load imposed. Support individual conduit 1-1/2" and larger and all multiple conduit runs with hangers. Clamp conduits individually to each support.