Cities Index.
Agenda packet, regular meeting

Moreno Valley City Council
June 21, 2022

Document
Agenda packet, regular meeting
Meeting
June 21, 2022
Body
Moreno Valley City Council
Pages
75
Original file
208.2 MB
Text extracted from the city's file for reading and search. Open the original on movalarchive.org. That file is the official record.

F.1.k
Packet Pg. 1825 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828EX10024100
116 9.67 0.70 0.378 0.157 ( 0.340) 0.221
117 9.75 0.70 0.378 0.156 ( 0.340) 0.222
118 9.83 0.73 0.396 0.156 ( 0.356) 0.240
119 9.92 0.73 0.396 0.155 ( 0.356) 0.241
120 10.00 0.73 0.396 0.154 ( 0.356) 0.242
121 10.08 0.50 0.270 0.153 ( 0.243) 0.117
122 10.17 0.50 0.270 0.153 ( 0.243) 0.117
123 10.25 0.50 0.270 0.152 ( 0.243) 0.118
124 10.33 0.50 0.270 0.151 ( 0.243) 0.119
125 10.42 0.50 0.270 0.150 ( 0.243) 0.120
126 10.50 0.50 0.270 0.150 ( 0.243) 0.120
127 10.58 0.67 0.360 0.149 ( 0.324) 0.211
128 10.67 0.67 0.360 0.148 ( 0.324) 0.212
129 10.75 0.67 0.360 0.148 ( 0.324) 0.212
130 10.83 0.67 0.360 0.147 ( 0.324) 0.213
131 10.92 0.67 0.360 0.146 ( 0.324) 0.214
132 11.00 0.67 0.360 0.145 ( 0.324) 0.215
133 11.08 0.63 0.342 0.145 ( 0.308) 0.197
134 11.17 0.63 0.342 0.144 ( 0.308) 0.198
135 11.25 0.63 0.342 0.143 ( 0.308) 0.199
136 11.33 0.63 0.342 0.143 ( 0.308) 0.199
137 11.42 0.63 0.342 0.142 ( 0.308) 0.200
138 11.50 0.63 0.342 0.141 ( 0.308) 0.201
139 11.58 0.57 0.306 0.140 ( 0.275) 0.166
140 11.67 0.57 0.306 0.140 ( 0.275) 0.166
141 11.75 0.57 0.306 0.139 ( 0.275) 0.167
142 11.83 0.60 0.324 0.138 ( 0.292) 0.186
143 11.92 0.60 0.324 0.138 ( 0.292) 0.186
144 12.00 0.60 0.324 0.137 ( 0.292) 0.187
145 12.08 0.83 0.450 0.136 ( 0.405) 0.314
146 12.17 0.83 0.450 0.136 ( 0.405) 0.314
147 12.25 0.83 0.450 0.135 ( 0.405) 0.315
148 12.33 0.87 0.468 0.134 ( 0.421) 0.334
149 12.42 0.87 0.468 0.134 ( 0.421) 0.334
150 12.50 0.87 0.468 0.133 ( 0.421) 0.335
151 12.58 0.93 0.504 0.132 ( 0.454) 0.372
152 12.67 0.93 0.504 0.132 ( 0.454) 0.372
153 12.75 0.93 0.504 0.131 ( 0.454) 0.373
154 12.83 0.97 0.522 0.130 ( 0.470) 0.392
155 12.92 0.97 0.522 0.130 ( 0.470) 0.392
156 13.00 0.97 0.522 0.129 ( 0.470) 0.393
157 13.08 1.13 0.612 0.128 ( 0.551) 0.484
158 13.17 1.13 0.612 0.128 ( 0.551) 0.484
159 13.25 1.13 0.612 0.127 ( 0.551) 0.485
160 13.33 1.13 0.612 0.126 ( 0.551) 0.486
161 13.42 1.13 0.612 0.126 ( 0.551) 0.486
162 13.50 1.13 0.612 0.125 ( 0.551) 0.487
163 13.58 0.77 0.414 0.124 ( 0.373) 0.290
164 13.67 0.77 0.414 0.124 ( 0.373) 0.290
165 13.75 0.77 0.414 0.123 ( 0.373) 0.291
166 13.83 0.77 0.414 0.122 ( 0.373) 0.291
167 13.92 0.77 0.414 0.122 ( 0.373) 0.292
168 14.00 0.77 0.414 0.121 ( 0.373) 0.293
169 14.08 0.90 0.486 0.121 ( 0.437) 0.365
170 14.17 0.90 0.486 0.120 ( 0.437) 0.366
171 14.25 0.90 0.486 0.119 ( 0.437) 0.367
172 14.33 0.87 0.468 0.119 ( 0.421) 0.349
173 14.42 0.87 0.468 0.118 ( 0.421) 0.350
174 14.50 0.87 0.468 0.118 ( 0.421) 0.350
175 14.58 0.87 0.468 0.117 ( 0.421) 0.351
176 14.67 0.87 0.468 0.116 ( 0.421) 0.352
177 14.75 0.87 0.468 0.116 ( 0.421) 0.352
178 14.83 0.83 0.450 0.115 ( 0.405) 0.335
179 14.92 0.83 0.450 0.115 ( 0.405) 0.335
180 15.00 0.83 0.450 0.114 ( 0.405) 0.336
181 15.08 0.80 0.432 0.113 ( 0.389) 0.319
182 15.17 0.80 0.432 0.113 ( 0.389) 0.319
183 15.25 0.80 0.432 0.112 ( 0.389) 0.320
184 15.33 0.77 0.414 0.112 ( 0.373) 0.302
185 15.42 0.77 0.414 0.111 ( 0.373) 0.303
186 15.50 0.77 0.414 0.111 ( 0.373) 0.303
187 15.58 0.63 0.342 0.110 ( 0.308) 0.232
188 15.67 0.63 0.342 0.109 ( 0.308) 0.233
189 15.75 0.63 0.342 0.109 ( 0.308) 0.233
190 15.83 0.63 0.342 0.108 ( 0.308) 0.234
191 15.92 0.63 0.342 0.108 ( 0.308) 0.234
192 16.00 0.63 0.342 0.107 ( 0.308) 0.235

Page 4 ends

F.1.k
Packet Pg. 1826 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828EX10024100
193 16.08 0.13 0.072 ( 0.107) 0.065 0.007
194 16.17 0.13 0.072 ( 0.106) 0.065 0.007
195 16.25 0.13 0.072 ( 0.106) 0.065 0.007
196 16.33 0.13 0.072 ( 0.105) 0.065 0.007
197 16.42 0.13 0.072 ( 0.104) 0.065 0.007
198 16.50 0.13 0.072 ( 0.104) 0.065 0.007
199 16.58 0.10 0.054 ( 0.103) 0.049 0.005
200 16.67 0.10 0.054 ( 0.103) 0.049 0.005
201 16.75 0.10 0.054 ( 0.102) 0.049 0.005
202 16.83 0.10 0.054 ( 0.102) 0.049 0.005
203 16.92 0.10 0.054 ( 0.101) 0.049 0.005
204 17.00 0.10 0.054 ( 0.101) 0.049 0.005
205 17.08 0.17 0.090 ( 0.100) 0.081 0.009
206 17.17 0.17 0.090 ( 0.100) 0.081 0.009
207 17.25 0.17 0.090 ( 0.099) 0.081 0.009
208 17.33 0.17 0.090 ( 0.099) 0.081 0.009
209 17.42 0.17 0.090 ( 0.098) 0.081 0.009
210 17.50 0.17 0.090 ( 0.098) 0.081 0.009
211 17.58 0.17 0.090 ( 0.097) 0.081 0.009
212 17.67 0.17 0.090 ( 0.097) 0.081 0.009
213 17.75 0.17 0.090 ( 0.096) 0.081 0.009
214 17.83 0.13 0.072 ( 0.096) 0.065 0.007
215 17.92 0.13 0.072 ( 0.095) 0.065 0.007
216 18.00 0.13 0.072 ( 0.095) 0.065 0.007
217 18.08 0.13 0.072 ( 0.094) 0.065 0.007
218 18.17 0.13 0.072 ( 0.094) 0.065 0.007
219 18.25 0.13 0.072 ( 0.094) 0.065 0.007
220 18.33 0.13 0.072 ( 0.093) 0.065 0.007
221 18.42 0.13 0.072 ( 0.093) 0.065 0.007
222 18.50 0.13 0.072 ( 0.092) 0.065 0.007
223 18.58 0.10 0.054 ( 0.092) 0.049 0.005
224 18.67 0.10 0.054 ( 0.091) 0.049 0.005
225 18.75 0.10 0.054 ( 0.091) 0.049 0.005
226 18.83 0.07 0.036 ( 0.090) 0.032 0.004
227 18.92 0.07 0.036 ( 0.090) 0.032 0.004
228 19.00 0.07 0.036 ( 0.090) 0.032 0.004
229 19.08 0.10 0.054 ( 0.089) 0.049 0.005
230 19.17 0.10 0.054 ( 0.089) 0.049 0.005
231 19.25 0.10 0.054 ( 0.088) 0.049 0.005
232 19.33 0.13 0.072 ( 0.088) 0.065 0.007
233 19.42 0.13 0.072 ( 0.087) 0.065 0.007
234 19.50 0.13 0.072 ( 0.087) 0.065 0.007
235 19.58 0.10 0.054 ( 0.087) 0.049 0.005
236 19.67 0.10 0.054 ( 0.086) 0.049 0.005
237 19.75 0.10 0.054 ( 0.086) 0.049 0.005
238 19.83 0.07 0.036 ( 0.086) 0.032 0.004
239 19.92 0.07 0.036 ( 0.085) 0.032 0.004
240 20.00 0.07 0.036 ( 0.085) 0.032 0.004
241 20.08 0.10 0.054 ( 0.084) 0.049 0.005
242 20.17 0.10 0.054 ( 0.084) 0.049 0.005
243 20.25 0.10 0.054 ( 0.084) 0.049 0.005
244 20.33 0.10 0.054 ( 0.083) 0.049 0.005
245 20.42 0.10 0.054 ( 0.083) 0.049 0.005
246 20.50 0.10 0.054 ( 0.083) 0.049 0.005
247 20.58 0.10 0.054 ( 0.082) 0.049 0.005
248 20.67 0.10 0.054 ( 0.082) 0.049 0.005
249 20.75 0.10 0.054 ( 0.082) 0.049 0.005
250 20.83 0.07 0.036 ( 0.081) 0.032 0.004
251 20.92 0.07 0.036 ( 0.081) 0.032 0.004
252 21.00 0.07 0.036 ( 0.081) 0.032 0.004
253 21.08 0.10 0.054 ( 0.080) 0.049 0.005
254 21.17 0.10 0.054 ( 0.080) 0.049 0.005
255 21.25 0.10 0.054 ( 0.080) 0.049 0.005
256 21.33 0.07 0.036 ( 0.079) 0.032 0.004
257 21.42 0.07 0.036 ( 0.079) 0.032 0.004
258 21.50 0.07 0.036 ( 0.079) 0.032 0.004
259 21.58 0.10 0.054 ( 0.078) 0.049 0.005
260 21.67 0.10 0.054 ( 0.078) 0.049 0.005
261 21.75 0.10 0.054 ( 0.078) 0.049 0.005
262 21.83 0.07 0.036 ( 0.078) 0.032 0.004
263 21.92 0.07 0.036 ( 0.077) 0.032 0.004
264 22.00 0.07 0.036 ( 0.077) 0.032 0.004
265 22.08 0.10 0.054 ( 0.077) 0.049 0.005
266 22.17 0.10 0.054 ( 0.077) 0.049 0.005
267 22.25 0.10 0.054 ( 0.076) 0.049 0.005
268 22.33 0.07 0.036 ( 0.076) 0.032 0.004
269 22.42 0.07 0.036 ( 0.076) 0.032 0.004

Page 5 ends

F.1.k
Packet Pg. 1827 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828EX10024100
270 22.50 0.07 0.036 ( 0.076) 0.032 0.004
271 22.58 0.07 0.036 ( 0.075) 0.032 0.004
272 22.67 0.07 0.036 ( 0.075) 0.032 0.004
273 22.75 0.07 0.036 ( 0.075) 0.032 0.004
274 22.83 0.07 0.036 ( 0.075) 0.032 0.004
275 22.92 0.07 0.036 ( 0.075) 0.032 0.004
276 23.00 0.07 0.036 ( 0.074) 0.032 0.004
277 23.08 0.07 0.036 ( 0.074) 0.032 0.004
278 23.17 0.07 0.036 ( 0.074) 0.032 0.004
279 23.25 0.07 0.036 ( 0.074) 0.032 0.004
280 23.33 0.07 0.036 ( 0.074) 0.032 0.004
281 23.42 0.07 0.036 ( 0.074) 0.032 0.004
282 23.50 0.07 0.036 ( 0.074) 0.032 0.004
283 23.58 0.07 0.036 ( 0.073) 0.032 0.004
284 23.67 0.07 0.036 ( 0.073) 0.032 0.004
285 23.75 0.07 0.036 ( 0.073) 0.032 0.004
286 23.83 0.07 0.036 ( 0.073) 0.032 0.004
287 23.92 0.07 0.036 ( 0.073) 0.032 0.004
288 24.00 0.07 0.036 ( 0.073) 0.032 0.004
(Loss Rate Not Used)
Sum = 100.0 Sum = 26.3
Flood volume = Effective rainfall 2.19(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 12.3(Ac.Ft)
Total soil loss = 2.31(In)
Total soil loss = 12.893(Ac.Ft)
Total rainfall = 4.50(In)
Flood volume = 534307.9 Cubic Feet
Total soil loss = 561626.9 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 31.869(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 24 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 10.0 20.0 30.0 40.0
----------------------------------------------------------------------- 0+ 5 0.0001 0.02 Q | | | |
0+10 0.0007 0.08 Q | | | |
0+15 0.0018 0.15 Q | | | |
0+20 0.0031 0.19 Q | | | |
0+25 0.0047 0.24 Q | | | |
0+30 0.0067 0.29 Q | | | |
0+35 0.0089 0.31 Q | | | |
0+40 0.0111 0.32 Q | | | |
0+45 0.0134 0.33 Q | | | |
0+50 0.0158 0.35 Q | | | |
0+55 0.0185 0.39 Q | | | |
1+ 0 0.0215 0.43 Q | | | |
1+ 5 0.0245 0.44 Q | | | |
1+10 0.0274 0.42 Q | | | |
1+15 0.0300 0.39 Q | | | |
1+20 0.0327 0.38 Q | | | |
1+25 0.0353 0.38 Q | | | |
1+30 0.0378 0.37 Q | | | |
1+35 0.0404 0.37 Q | | | |
1+40 0.0430 0.37 Q | | | |
1+45 0.0455 0.37 Q | | | |
1+50 0.0481 0.38 Q | | | |
1+55 0.0509 0.41 Q | | | |
2+ 0 0.0540 0.44 Q | | | |
2+ 5 0.0572 0.46 Q | | | |
2+10 0.0604 0.47 Q | | | |
2+15 0.0636 0.47 Q | | | |
2+20 0.0669 0.47 Q | | | |
2+25 0.0702 0.48 Q | | | |
2+30 0.0735 0.48 Q | | | |
2+35 0.0768 0.49 Q | | | |
2+40 0.0805 0.53 Q | | | |
2+45 0.0843 0.56 Q | | | |
2+50 0.0883 0.58 Q | | | |
2+55 0.0923 0.59 Q | | | |
3+ 0 0.0964 0.59 Q | | | |
3+ 5 0.1005 0.60 Q | | | |

Page 6 ends

F.1.k
Packet Pg. 1828 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828EX10024100
3+10 0.1047 0.60 Q | | | |
3+15 0.1088 0.60 Q | | | |
3+20 0.1130 0.60 Q | | | |
3+25 0.1171 0.61 Q | | | |
3+30 0.1213 0.61 Q | | | |
3+35 0.1255 0.61 Q | | | |
3+40 0.1297 0.61 Q | | | |
3+45 0.1339 0.61 Q | | | |
3+50 0.1381 0.62 Q | | | |
3+55 0.1426 0.65 Q | | | |
4+ 0 0.1473 0.69 Q | | | |
4+ 5 0.1521 0.70 Q | | | |
4+10 0.1570 0.71 Q | | | |
4+15 0.1619 0.71 Q | | | |
4+20 0.1669 0.73 Q | | | |
4+25 0.1722 0.76 Q | | | |
4+30 0.1777 0.80 Q | | | |
4+35 0.1833 0.82 Q | | | |
4+40 0.1890 0.83 Q | | | |
4+45 0.1948 0.83 Q | | | |
4+50 0.2006 0.85 Q | | | |
4+55 0.2067 0.88 Q | | | |
5+ 0 0.2130 0.92 Q | | | |
5+ 5 0.2194 0.92 Q | | | |
5+10 0.2253 0.86 Q | | | |
5+15 0.2309 0.80 Q | | | |
5+20 0.2363 0.78 Q | | | |
5+25 0.2418 0.81 Q | | | |
5+30 0.2475 0.83 Q | | | |
5+35 0.2534 0.85 Q | | | |
5+40 0.2595 0.89 Q | | | |
5+45 0.2659 0.92 Q | | | |
5+50 0.2724 0.94 Q | | | |
5+55 0.2789 0.95 Q | | | |
6+ 0 0.2855 0.96 Q | | | |
6+ 5 0.2921 0.97 Q | | | |
6+10 0.2991 1.01 VQ | | | |
6+15 0.3062 1.04 VQ | | | |
6+20 0.3135 1.06 |Q | | | |
6+25 0.3209 1.07 |Q | | | |
6+30 0.3283 1.08 |Q | | | |
6+35 0.3358 1.09 |Q | | | |
6+40 0.3436 1.13 |Q | | | |
6+45 0.3516 1.17 |Q | | | |
6+50 0.3598 1.18 |Q | | | |
6+55 0.3680 1.19 |Q | | | |
7+ 0 0.3762 1.20 |Q | | | |
7+ 5 0.3845 1.20 |Q | | | |
7+10 0.3928 1.21 |Q | | | |
7+15 0.4012 1.21 |Q | | | |
7+20 0.4096 1.22 |Q | | | |
7+25 0.4182 1.26 |Q | | | |
7+30 0.4271 1.29 |Q | | | |
7+35 0.4368 1.40 |Q | | | |
7+40 0.4491 1.79 |Q | | | |
7+45 0.4641 2.18 |VQ | | | |
7+50 0.4810 2.46 |VQ | | | |
7+55 0.5012 2.93 |VQ | | | |
8+ 0 0.5245 3.38 |V Q | | | |
8+ 5 0.5505 3.78 |V Q | | | |
8+10 0.5824 4.63 |V Q | | | |
8+15 0.6200 5.46 | V Q | | | |
8+20 0.6604 5.86 | V Q | | | |
8+25 0.7026 6.12 | V Q | | | |
8+30 0.7461 6.32 | V Q | | | |
8+35 0.7913 6.56 | V Q | | | |
8+40 0.8398 7.04 | V Q | | | |
8+45 0.8914 7.50 | V Q | | | |
8+50 0.9454 7.84 | V Q | | | |
8+55 1.0029 8.35 | V Q | | | |
9+ 0 1.0637 8.83 | V Q | | | |
9+ 5 1.1274 9.26 | V Q| | | |
9+10 1.1971 10.12 | V Q | | |
9+15 1.2726 10.95 | V Q | | |
9+20 1.3514 11.45 | V |Q | | |
9+25 1.4344 12.05 | V | Q | | |
9+30 1.5212 12.60 | V | Q | | |

Page 7 ends

F.1.k
Packet Pg. 1829 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828EX10024100
9+35 1.6106 12.98 | V | Q | | |
9+40 1.7039 13.54 | V | Q | | |
9+45 1.8007 14.06 | V | Q | | |
9+50 1.9000 14.43 | V | Q | | |
9+55 2.0031 14.97 | V | Q | | |
10+ 0 2.1097 15.47 | V | Q | | |
10+ 5 2.2143 15.19 | V | Q | | |
10+10 2.3037 12.99 | V | Q | | |
10+15 2.3775 10.71 | V Q | | |
10+20 2.4450 9.80 | V Q| | | |
10+25 2.5093 9.34 | VQ| | | |
10+30 2.5715 9.04 | VQ| | | |
10+35 2.6351 9.24 | VQ| | | |
10+40 2.7095 10.81 | V Q | | |
10+45 2.7953 12.46 | V| Q | | |
10+50 2.8858 13.13 | V| Q | | |
10+55 2.9787 13.49 | V| Q | | |
11+ 0 3.0733 13.74 | V Q | | |
11+ 5 3.1688 13.86 | V Q | | |
11+10 3.2629 13.67 | V Q | | |
11+15 3.3554 13.43 | V Q | | |
11+20 3.4476 13.39 | |V Q | | |
11+25 3.5401 13.43 | |V Q | | |
11+30 3.6330 13.48 | |V Q | | |
11+35 3.7251 13.37 | | VQ | | |
11+40 3.8128 12.74 | | Q | | |
11+45 3.8962 12.10 | | Q | | |
11+50 3.9784 11.94 | |QV | | |
11+55 4.0621 12.15 | | QV | | |
12+ 0 4.1477 12.42 | | QV | | |
12+ 5 4.2378 13.09 | | Q | | |
12+10 4.3449 15.55 | | VQ | | |
12+15 4.4691 18.03 | | V Q | | |
12+20 4.6012 19.19 | | V Q| | |
12+25 4.7400 20.14 | | V Q | |
12+30 4.8841 20.93 | | V Q | |
12+35 5.0326 21.56 | | V |Q | |
12+40 5.1882 22.58 | | V | Q | |
12+45 5.3502 23.53 | | V | Q | |
12+50 5.5164 24.13 | | V | Q | |
12+55 5.6873 24.81 | | V | Q | |
13+ 0 5.8624 25.42 | | V| Q | |
13+ 5 6.0427 26.18 | | V| Q | |
13+10 6.2365 28.14 | | V Q | |
13+15 6.4436 30.08 | | |V Q |
13+20 6.6570 30.98 | | |V Q |
13+25 6.8739 31.50 | | | V |Q |
13+30 7.0934 31.87 | | | V |Q |
13+35 7.3088 31.27 | | | V |Q |
13+40 7.4998 27.73 | | | V Q | |
13+45 7.6657 24.09 | | | Q | |
13+50 7.8214 22.61 | | | Q V | |
13+55 7.9719 21.85 | | |Q V | |
14+ 0 8.1189 21.34 | | |Q V | |
14+ 5 8.2657 21.31 | | |Q V | |
14+10 8.4201 22.43 | | | Q V | |
14+15 8.5830 23.65 | | | Q V | |
14+20 8.7484 24.02 | | | Q V | |
14+25 8.9129 23.88 | | | Q V| |
14+30 9.0760 23.68 | | | Q V| |
14+35 9.2387 23.63 | | | Q V |
14+40 9.4015 23.64 | | | Q V |
14+45 9.5644 23.64 | | | Q |V |
14+50 9.7268 23.58 | | | Q |V |
14+55 9.8873 23.31 | | | Q | V |
15+ 0 10.0459 23.03 | | | Q | V |
15+ 5 10.2033 22.85 | | | Q | V |
15+10 10.3581 22.48 | | | Q | V |
15+15 10.5106 22.13 | | | Q | V |
15+20 10.6615 21.92 | | |Q | V |
15+25 10.8096 21.50 | | |Q | V |
15+30 10.9549 21.10 | | |Q | V |
15+35 11.0969 20.61 | | Q | V |
15+40 11.2288 19.16 | | Q| | V |
15+45 11.3508 17.72 | | Q | | V |
15+50 11.4685 17.09 | | Q | | V |
15+55 11.5840 16.76 | | Q | | V |

Page 8 ends

F.1.k
Packet Pg. 1830 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828EX10024100
16+ 0 11.6978 16.53 | | Q | | V |
16+ 5 11.8036 15.36 | | Q | | V |
16+10 11.8789 10.92 | Q | | V |
16+15 11.9232 6.44 | Q | | | V |
16+20 11.9541 4.48 | Q | | | V |
16+25 11.9775 3.41 | Q | | | V|
16+30 11.9958 2.65 | Q | | | V|
16+35 12.0103 2.10 | Q | | | V|
16+40 12.0218 1.67 |Q | | | V|
16+45 12.0309 1.33 |Q | | | V|
16+50 12.0382 1.06 |Q | | | V|
16+55 12.0442 0.87 Q | | | V|
17+ 0 12.0492 0.72 Q | | | V|
17+ 5 12.0534 0.62 Q | | | V|
17+10 12.0576 0.60 Q | | | V|
17+15 12.0617 0.59 Q | | | V|
17+20 12.0655 0.55 Q | | | V|
17+25 12.0694 0.57 Q | | | V|
17+30 12.0734 0.58 Q | | | V|
17+35 12.0774 0.59 Q | | | V|
17+40 12.0815 0.59 Q | | | V|
17+45 12.0856 0.60 Q | | | V|
17+50 12.0897 0.59 Q | | | V|
17+55 12.0935 0.56 Q | | | V|
18+ 0 12.0971 0.53 Q | | | V|
18+ 5 12.1007 0.51 Q | | | V|
18+10 12.1042 0.51 Q | | | V|
18+15 12.1076 0.50 Q | | | V|
18+20 12.1111 0.50 Q | | | V|
18+25 12.1145 0.50 Q | | | V|
18+30 12.1179 0.49 Q | | | V|
18+35 12.1212 0.48 Q | | | V|
18+40 12.1243 0.45 Q | | | V|
18+45 12.1272 0.41 Q | | | V|
18+50 12.1298 0.39 Q | | | V|
18+55 12.1322 0.35 Q | | | V|
19+ 0 12.1343 0.31 Q | | | V|
19+ 5 12.1363 0.29 Q | | | V|
19+10 12.1385 0.32 Q | | | V|
19+15 12.1409 0.34 Q | | | V|
19+20 12.1434 0.36 Q | | | V|
19+25 12.1461 0.40 Q | | | V|
19+30 12.1491 0.44 Q | | | V|
19+35 12.1522 0.44 Q | | | V|
19+40 12.1551 0.42 Q | | | V|
19+45 12.1578 0.39 Q | | | V|
19+50 12.1603 0.37 Q | | | V|
19+55 12.1626 0.33 Q | | | V|
20+ 0 12.1646 0.30 Q | | | V|
20+ 5 12.1666 0.29 Q | | | V|
20+10 12.1688 0.31 Q | | | V|
20+15 12.1711 0.34 Q | | | V|
20+20 12.1735 0.35 Q | | | V|
20+25 12.1760 0.36 Q | | | V|
20+30 12.1784 0.36 Q | | | V|
20+35 12.1809 0.36 Q | | | V|
20+40 12.1834 0.36 Q | | | V|
20+45 12.1859 0.36 Q | | | V|
20+50 12.1883 0.35 Q | | | V|
20+55 12.1905 0.32 Q | | | V|
21+ 0 12.1925 0.29 Q | | | V|
21+ 5 12.1944 0.28 Q | | | V|
21+10 12.1966 0.31 Q | | | V|
21+15 12.1989 0.34 Q | | | V|
21+20 12.2012 0.34 Q | | | V|
21+25 12.2033 0.31 Q | | | V|
21+30 12.2053 0.28 Q | | | V|
21+35 12.2072 0.27 Q | | | V|
21+40 12.2092 0.30 Q | | | V|
21+45 12.2115 0.33 Q | | | V|
21+50 12.2138 0.34 Q | | | V|
21+55 12.2160 0.31 Q | | | V|
22+ 0 12.2179 0.28 Q | | | V|
22+ 5 12.2198 0.27 Q | | | V|
22+10 12.2218 0.30 Q | | | V|
22+15 12.2241 0.33 Q | | | V|
22+20 12.2264 0.34 Q | | | V|

Page 9 ends

F.1.k
Packet Pg. 1831 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828EX10024100
22+25 12.2285 0.31 Q | | | V|
22+30 12.2305 0.28 Q | | | V|
22+35 12.2323 0.26 Q | | | V|
22+40 12.2341 0.26 Q | | | V|
22+45 12.2358 0.25 Q | | | V|
22+50 12.2376 0.25 Q | | | V|
22+55 12.2393 0.25 Q | | | V|
23+ 0 12.2410 0.25 Q | | | V|
23+ 5 12.2427 0.25 Q | | | V|
23+10 12.2444 0.25 Q | | | V|
23+15 12.2461 0.25 Q | | | V|
23+20 12.2478 0.25 Q | | | V|
23+25 12.2494 0.24 Q | | | V|
23+30 12.2511 0.24 Q | | | V|
23+35 12.2528 0.24 Q | | | V|
23+40 12.2545 0.24 Q | | | V|
23+45 12.2562 0.24 Q | | | V|
23+50 12.2578 0.24 Q | | | V|
23+55 12.2595 0.24 Q | | | V|
24+ 0 12.2612 0.24 Q | | | V|
24+ 5 12.2628 0.23 Q | | | V|
24+10 12.2639 0.16 Q | | | V|
24+15 12.2645 0.09 Q | | | V|
24+20 12.2649 0.06 Q | | | V|
24+25 12.2652 0.04 Q | | | V|
24+30 12.2654 0.03 Q | | | V|
24+35 12.2656 0.02 Q | | | V|
24+40 12.2657 0.02 Q | | | V|
24+45 12.2658 0.01 Q | | | V|
24+50 12.2659 0.01 Q | | | V|
24+55 12.2659 0.01 Q | | | V|
25+ 0 12.2660 0.01 Q | | | V|
25+ 5 12.2660 0.00 Q | | | V|
25+10 12.2660 0.00 Q | | | V|
25+15 12.2660 0.00 Q | | | V
-----------------------------------------------------------------------

Page 10 ends

F.1.k
Packet Pg. 1832 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.k
Packet Pg. 1833 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR212
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR212.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 2-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 1 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 0.50 33.55
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.20 80.52
STORM EVENT (YEAR) = 2.00
Area Averaged 2-Year Rainfall = 0.500(In)
Area Averaged 100-Year Rainfall = 1.200(In)
Point rain (area averaged) = 0.500(In)
Areal adjustment factor = 99.94 %
Adjusted average point rain = 0.500(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-1 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 36.0 0.706 0.900 0.134 1.000 0.134
Sum (F) = 0.134

Page 1 ends

F.1.k
Packet Pg. 1834 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR212
Area averaged mean soil loss (F) (In/Hr) = 0.134
Minimum soil loss rate ((In/Hr)) = 0.067
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- Slope of intensity-duration curve for a 1 hour storm =0.5000 ---------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 4.20 0.252 ( 0.134) 0.025 0.227
2 0.17 4.30 0.258 ( 0.134) 0.026 0.232
3 0.25 5.00 0.300 ( 0.134) 0.030 0.270
4 0.33 5.00 0.300 ( 0.134) 0.030 0.270
5 0.42 5.80 0.348 ( 0.134) 0.035 0.313
6 0.50 6.50 0.390 ( 0.134) 0.039 0.351
7 0.58 7.40 0.444 ( 0.134) 0.044 0.399
8 0.67 8.60 0.516 ( 0.134) 0.052 0.464
9 0.75 12.30 0.738 ( 0.134) 0.074 0.664
10 0.83 29.10 1.745 0.134 ( 0.174) 1.611
11 0.92 6.80 0.408 ( 0.134) 0.041 0.367
12 1.00 5.00 0.300 ( 0.134) 0.030 0.270
(Loss Rate Not Used)
Sum = 100.0 Sum = 5.4
Flood volume = Effective rainfall 0.45(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 2.5(Ac.Ft)
Total soil loss = 0.05(In)
Total soil loss = 0.261(Ac.Ft)
Total rainfall = 0.50(In)
Flood volume = 110360.3 Cubic Feet
Total soil loss = 11352.2 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 69.176(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 17.5 35.0 52.5 70.0
----------------------------------------------------------------------- 0+ 5 0.0218 3.16 VQ | | | |
0+10 0.0955 10.70 |V Q | | | |
0+15 0.1898 13.70 | V Q | | | |
0+20 0.3004 16.05 | V Q| | | |
0+25 0.4219 17.64 | V Q | | |
0+30 0.5607 20.15 | V |Q | | |
0+35 0.7180 22.84 | |V Q | | |
0+40 0.8983 26.18 | | Q | | |
0+45 1.1181 31.92 | | VQ | | |
0+50 1.4816 52.78 | | | V Q |
0+55 1.9580 69.18 | | | V Q|

Page 2 ends

F.1.k
Packet Pg. 1835 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR212
1+ 0 2.2176 37.69 | | |Q | V |
1+ 5 2.3773 23.20 | | Q | | V |
1+10 2.4493 10.45 | Q | | | V |
1+15 2.4898 5.88 | Q | | | V|
1+20 2.5135 3.44 |Q | | | V|
1+25 2.5281 2.13 |Q | | | V|
1+30 2.5320 0.57 Q | | | V|
1+35 2.5335 0.22 Q | | | V
-----------------------------------------------------------------------

Page 3 ends

F.1.k
Packet Pg. 1836 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR232
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR232.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 2-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 3 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 0.80 53.68
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.86 124.81
STORM EVENT (YEAR) = 2.00
Area Averaged 2-Year Rainfall = 0.800(In)
Area Averaged 100-Year Rainfall = 1.860(In)
Point rain (area averaged) = 0.800(In)
Areal adjustment factor = 99.97 %
Adjusted average point rain = 0.800(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-1 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 36.0 0.706 0.900 0.134 1.000 0.134
Sum (F) = 0.134

Page 1 ends

F.1.k
Packet Pg. 1837 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR232
Area averaged mean soil loss (F) (In/Hr) = 0.134
Minimum soil loss rate ((In/Hr)) = 0.067
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 1.30 0.125 ( 0.134) 0.012 0.112
2 0.17 1.30 0.125 ( 0.134) 0.012 0.112
3 0.25 1.10 0.106 ( 0.134) 0.011 0.095
4 0.33 1.50 0.144 ( 0.134) 0.014 0.130
5 0.42 1.50 0.144 ( 0.134) 0.014 0.130
6 0.50 1.80 0.173 ( 0.134) 0.017 0.155
7 0.58 1.50 0.144 ( 0.134) 0.014 0.130
8 0.67 1.80 0.173 ( 0.134) 0.017 0.155
9 0.75 1.80 0.173 ( 0.134) 0.017 0.155
10 0.83 1.50 0.144 ( 0.134) 0.014 0.130
11 0.92 1.60 0.154 ( 0.134) 0.015 0.138
12 1.00 1.80 0.173 ( 0.134) 0.017 0.155
13 1.08 2.20 0.211 ( 0.134) 0.021 0.190
14 1.17 2.20 0.211 ( 0.134) 0.021 0.190
15 1.25 2.20 0.211 ( 0.134) 0.021 0.190
16 1.33 2.00 0.192 ( 0.134) 0.019 0.173
17 1.42 2.60 0.250 ( 0.134) 0.025 0.225
18 1.50 2.70 0.259 ( 0.134) 0.026 0.233
19 1.58 2.40 0.230 ( 0.134) 0.023 0.207
20 1.67 2.70 0.259 ( 0.134) 0.026 0.233
21 1.75 3.30 0.317 ( 0.134) 0.032 0.285
22 1.83 3.10 0.298 ( 0.134) 0.030 0.268
23 1.92 2.90 0.278 ( 0.134) 0.028 0.250
24 2.00 3.00 0.288 ( 0.134) 0.029 0.259
25 2.08 3.10 0.298 ( 0.134) 0.030 0.268
26 2.17 4.20 0.403 ( 0.134) 0.040 0.363
27 2.25 5.00 0.480 ( 0.134) 0.048 0.432
28 2.33 3.50 0.336 ( 0.134) 0.034 0.302
29 2.42 6.80 0.653 ( 0.134) 0.065 0.587
30 2.50 7.30 0.701 ( 0.134) 0.070 0.631
31 2.58 8.20 0.787 ( 0.134) 0.079 0.708
32 2.67 5.90 0.566 ( 0.134) 0.057 0.510
33 2.75 2.00 0.192 ( 0.134) 0.019 0.173
34 2.83 1.80 0.173 ( 0.134) 0.017 0.155
35 2.92 1.80 0.173 ( 0.134) 0.017 0.155
36 3.00 0.60 0.058 ( 0.134) 0.006 0.052
(Loss Rate Not Used)
Sum = 100.0 Sum = 8.6
Flood volume = Effective rainfall 0.72(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 4.0(Ac.Ft)
Total soil loss = 0.08(In)
Total soil loss = 0.447(Ac.Ft)
Total rainfall = 0.80(In)
Flood volume = 175321.1 Cubic Feet
Total soil loss = 19480.1 Cubic Feet
--------------------------------------------------------------------

Page 2 ends

F.1.k
Packet Pg. 1838 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR232
Peak flow rate of this hydrograph = 41.603(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 12.5 25.0 37.5 50.0
----------------------------------------------------------------------- 0+ 5 0.0108 1.57 VQ | | | |
0+10 0.0470 5.26 V Q | | | |
0+15 0.0895 6.16 V Q | | | |
0+20 0.1349 6.59 |V Q | | | |
0+25 0.1889 7.84 |V Q | | | |
0+30 0.2485 8.66 | V Q | | | |
0+35 0.3131 9.38 | V Q | | | |
0+40 0.3772 9.30 | V Q | | | |
0+45 0.4464 10.05 | V Q | | | |
0+50 0.5148 9.92 | V Q | | | |
0+55 0.5789 9.31 | V Q | | | |
1+ 0 0.6452 9.62 | VQ | | | |
1+ 5 0.7187 10.68 | VQ | | | |
1+10 0.8012 11.97 | V Q| | | |
1+15 0.8866 12.40 | VQ| | | |
1+20 0.9717 12.35 | Q| | | |
1+25 1.0585 12.61 | Q | | |
1+30 1.1573 14.35 | |Q | | |
1+35 1.2590 14.76 | |QV | | |
1+40 1.3594 14.58 | |Q V | | |
1+45 1.4699 16.04 | | Q V | | |
1+50 1.5920 17.74 | | QV | | |
1+55 1.7130 17.56 | | Q V | | |
2+ 0 1.8318 17.25 | | Q V | | |
2+ 5 1.9527 17.56 | | Q V| | |
2+10 2.0850 19.22 | | Q V | |
2+15 2.2465 23.44 | | Q | V | |
2+20 2.4181 24.93 | | Q| V | |
2+25 2.5957 25.78 | | Q V | |
2+30 2.8370 35.03 | | | Q | |
2+35 3.1137 40.18 | | | V Q |
2+40 3.4002 41.60 | | | | Q |
2+45 3.6207 32.01 | | | Q | V |
2+50 3.7552 19.53 | | Q | | V |
2+55 3.8591 15.08 | | Q | | V |
3+ 0 3.9403 11.80 | Q| | | V|
3+ 5 3.9851 6.50 | Q | | | V|
3+10 4.0058 3.01 | Q | | | V|
3+15 4.0161 1.48 |Q | | | V|
3+20 4.0208 0.68 Q | | | V|
3+25 4.0233 0.37 Q | | | V|
3+30 4.0245 0.18 Q | | | V|
3+35 4.0248 0.04 Q | | | V|
-----------------------------------------------------------------------

Page 3 ends

F.1.k
Packet Pg. 1839 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR262
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR262.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 2-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 6 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.15 77.16
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 2.50 167.75
STORM EVENT (YEAR) = 2.00
Area Averaged 2-Year Rainfall = 1.150(In)
Area Averaged 100-Year Rainfall = 2.500(In)
Point rain (area averaged) = 1.150(In)
Areal adjustment factor = 99.98 %
Adjusted average point rain = 1.150(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-1 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 36.0 0.706 0.900 0.134 1.000 0.134
Sum (F) = 0.134

Page 1 ends

F.1.k
Packet Pg. 1840 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR262
Area averaged mean soil loss (F) (In/Hr) = 0.134
Minimum soil loss rate ((In/Hr)) = 0.067
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 0.50 0.069 ( 0.134) 0.007 0.062
2 0.17 0.60 0.083 ( 0.134) 0.008 0.075
3 0.25 0.60 0.083 ( 0.134) 0.008 0.075
4 0.33 0.60 0.083 ( 0.134) 0.008 0.075
5 0.42 0.60 0.083 ( 0.134) 0.008 0.075
6 0.50 0.70 0.097 ( 0.134) 0.010 0.087
7 0.58 0.70 0.097 ( 0.134) 0.010 0.087
8 0.67 0.70 0.097 ( 0.134) 0.010 0.087
9 0.75 0.70 0.097 ( 0.134) 0.010 0.087
10 0.83 0.70 0.097 ( 0.134) 0.010 0.087
11 0.92 0.70 0.097 ( 0.134) 0.010 0.087
12 1.00 0.80 0.110 ( 0.134) 0.011 0.099
13 1.08 0.80 0.110 ( 0.134) 0.011 0.099
14 1.17 0.80 0.110 ( 0.134) 0.011 0.099
15 1.25 0.80 0.110 ( 0.134) 0.011 0.099
16 1.33 0.80 0.110 ( 0.134) 0.011 0.099
17 1.42 0.80 0.110 ( 0.134) 0.011 0.099
18 1.50 0.80 0.110 ( 0.134) 0.011 0.099
19 1.58 0.80 0.110 ( 0.134) 0.011 0.099
20 1.67 0.80 0.110 ( 0.134) 0.011 0.099
21 1.75 0.80 0.110 ( 0.134) 0.011 0.099
22 1.83 0.80 0.110 ( 0.134) 0.011 0.099
23 1.92 0.80 0.110 ( 0.134) 0.011 0.099
24 2.00 0.90 0.124 ( 0.134) 0.012 0.112
25 2.08 0.80 0.110 ( 0.134) 0.011 0.099
26 2.17 0.90 0.124 ( 0.134) 0.012 0.112
27 2.25 0.90 0.124 ( 0.134) 0.012 0.112
28 2.33 0.90 0.124 ( 0.134) 0.012 0.112
29 2.42 0.90 0.124 ( 0.134) 0.012 0.112
30 2.50 0.90 0.124 ( 0.134) 0.012 0.112
31 2.58 0.90 0.124 ( 0.134) 0.012 0.112
32 2.67 0.90 0.124 ( 0.134) 0.012 0.112
33 2.75 1.00 0.138 ( 0.134) 0.014 0.124
34 2.83 1.00 0.138 ( 0.134) 0.014 0.124
35 2.92 1.00 0.138 ( 0.134) 0.014 0.124
36 3.00 1.00 0.138 ( 0.134) 0.014 0.124
37 3.08 1.00 0.138 ( 0.134) 0.014 0.124
38 3.17 1.10 0.152 ( 0.134) 0.015 0.137
39 3.25 1.10 0.152 ( 0.134) 0.015 0.137
40 3.33 1.10 0.152 ( 0.134) 0.015 0.137
41 3.42 1.20 0.166 ( 0.134) 0.017 0.149
42 3.50 1.30 0.179 ( 0.134) 0.018 0.161
43 3.58 1.40 0.193 ( 0.134) 0.019 0.174
44 3.67 1.40 0.193 ( 0.134) 0.019 0.174
45 3.75 1.50 0.207 ( 0.134) 0.021 0.186
46 3.83 1.50 0.207 ( 0.134) 0.021 0.186

Page 2 ends

F.1.k
Packet Pg. 1841 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR262
47 3.92 1.60 0.221 ( 0.134) 0.022 0.199
48 4.00 1.60 0.221 ( 0.134) 0.022 0.199
49 4.08 1.70 0.235 ( 0.134) 0.023 0.211
50 4.17 1.80 0.248 ( 0.134) 0.025 0.224
51 4.25 1.90 0.262 ( 0.134) 0.026 0.236
52 4.33 2.00 0.276 ( 0.134) 0.028 0.248
53 4.42 2.10 0.290 ( 0.134) 0.029 0.261
54 4.50 2.10 0.290 ( 0.134) 0.029 0.261
55 4.58 2.20 0.304 ( 0.134) 0.030 0.273
56 4.67 2.30 0.317 ( 0.134) 0.032 0.286
57 4.75 2.40 0.331 ( 0.134) 0.033 0.298
58 4.83 2.40 0.331 ( 0.134) 0.033 0.298
59 4.92 2.50 0.345 ( 0.134) 0.034 0.310
60 5.00 2.60 0.359 ( 0.134) 0.036 0.323
61 5.08 3.10 0.428 ( 0.134) 0.043 0.385
62 5.17 3.60 0.497 ( 0.134) 0.050 0.447
63 5.25 3.90 0.538 ( 0.134) 0.054 0.484
64 5.33 4.20 0.579 ( 0.134) 0.058 0.522
65 5.42 4.70 0.648 ( 0.134) 0.065 0.584
66 5.50 5.60 0.773 ( 0.134) 0.077 0.695
67 5.58 1.90 0.262 ( 0.134) 0.026 0.236
68 5.67 0.90 0.124 ( 0.134) 0.012 0.112
69 5.75 0.60 0.083 ( 0.134) 0.008 0.075
70 5.83 0.50 0.069 ( 0.134) 0.007 0.062
71 5.92 0.30 0.041 ( 0.134) 0.004 0.037
72 6.00 0.20 0.028 ( 0.134) 0.003 0.025
(Loss Rate Not Used)
Sum = 100.0 Sum = 12.4
Flood volume = Effective rainfall 1.03(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 5.8(Ac.Ft)
Total soil loss = 0.11(In)
Total soil loss = 0.643(Ac.Ft)
Total rainfall = 1.15(In)
Flood volume = 252039.9 Cubic Feet
Total soil loss = 28004.4 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 38.797(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 10.0 20.0 30.0 40.0
----------------------------------------------------------------------- 0+ 5 0.0060 0.87 Q | | | |
0+10 0.0272 3.08 V Q | | | |
0+15 0.0556 4.12 V Q | | | |
0+20 0.0868 4.53 V Q | | | |
0+25 0.1195 4.75 V Q | | | |
0+30 0.1544 5.06 |V Q | | | |
0+35 0.1926 5.55 |V Q | | | |
0+40 0.2321 5.74 |V Q | | | |
0+45 0.2721 5.81 |V Q | | | |
0+50 0.3123 5.84 | V Q | | | |
0+55 0.3527 5.86 | V Q | | | |
1+ 0 0.3943 6.04 | V Q | | | |
1+ 5 0.4388 6.46 | V Q | | | |
1+10 0.4842 6.59 | V Q | | | |
1+15 0.5300 6.65 | V Q | | | |
1+20 0.5759 6.68 | V Q | | | |
1+25 0.6221 6.70 | V Q | | | |
1+30 0.6683 6.71 | V Q | | | |
1+35 0.7146 6.72 | V Q | | | |
1+40 0.7609 6.72 | VQ | | | |
1+45 0.8072 6.72 | VQ | | | |
1+50 0.8535 6.72 | VQ | | | |
1+55 0.8997 6.72 | Q | | | |
2+ 0 0.9472 6.89 | Q | | | |
2+ 5 0.9963 7.13 | VQ | | | |
2+10 1.0447 7.02 | Q | | | |
2+15 1.0954 7.36 | Q | | | |
2+20 1.1468 7.46 | Q | | | |
2+25 1.1985 7.51 | QV | | | |
2+30 1.2503 7.53 | QV | | | |

Page 3 ends

F.1.k
Packet Pg. 1842 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR262
2+35 1.3023 7.55 | Q V| | | |
2+40 1.3543 7.55 | Q V| | | |
2+45 1.4076 7.73 | Q V| | | |
2+50 1.4637 8.14 | Q V | | |
2+55 1.5206 8.27 | Q V | | |
3+ 0 1.5780 8.33 | Q V | | |
3+ 5 1.6355 8.36 | Q |V | | |
3+10 1.6944 8.55 | Q |V | | |
3+15 1.7562 8.97 | Q | V | | |
3+20 1.8190 9.11 | Q| V | | |
3+25 1.8833 9.34 | Q| V | | |
3+30 1.9518 9.95 | Q| V | | |
3+35 2.0254 10.68 | Q V | | |
3+40 2.1031 11.29 | |Q V | | |
3+45 2.1836 11.69 | |Q V | | |
3+50 2.2677 12.20 | | Q V | | |
3+55 2.3542 12.57 | | Q V | | |
4+ 0 2.4443 13.08 | | Q V | | |
4+ 5 2.5368 13.43 | | Q V | | |
4+10 2.6339 14.10 | | Q V | | |
4+15 2.7362 14.85 | | Q V | | |
4+20 2.8439 15.65 | | Q V| | |
4+25 2.9573 16.46 | | Q V | |
4+30 3.0751 17.11 | | Q |V | |
4+35 3.1959 17.53 | | Q | V | |
4+40 3.3216 18.25 | | Q | V | |
4+45 3.4526 19.03 | | Q| V | |
4+50 3.5881 19.67 | | Q| V | |
4+55 3.7263 20.08 | | Q V | |
5+ 0 3.8694 20.78 | | Q V | |
5+ 5 4.0226 22.24 | | | Q V | |
5+10 4.1974 25.38 | | | Q V| |
5+15 4.3950 28.69 | | | Q V |
5+20 4.6113 31.41 | | | |Q |
5+25 4.8479 34.36 | | | | VQ |
5+30 5.1151 38.80 | | | | V Q |
5+35 5.3709 37.14 | | | | Q |
5+40 5.5222 21.97 | | |Q | V |
5+45 5.6154 13.53 | | Q | | V |
5+50 5.6787 9.20 | Q| | | V|
5+55 5.7241 6.59 | Q | | | V|
6+ 0 5.7544 4.39 | Q | | | V|
6+ 5 5.7727 2.66 | Q | | | V|
6+10 5.7796 1.01 |Q | | | V|
6+15 5.7829 0.48 Q | | | V|
6+20 5.7846 0.25 Q | | | V|
6+25 5.7855 0.13 Q | | | V|
6+30 5.7859 0.06 Q | | | V|
6+35 5.7860 0.02 Q | | | V
-----------------------------------------------------------------------

Page 4 ends

F.1.k
Packet Pg. 1843 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR2242.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 2-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 24 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.75 117.42
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 4.50 301.95
STORM EVENT (YEAR) = 2.00
Area Averaged 2-Year Rainfall = 1.750(In)
Area Averaged 100-Year Rainfall = 4.500(In)
Point rain (area averaged) = 1.750(In)
Areal adjustment factor = 99.99 %
Adjusted average point rain = 1.750(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-1 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 36.0 0.706 0.900 0.134 1.000 0.134
Sum (F) = 0.134

Page 1 ends

F.1.k
Packet Pg. 1844 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
Area averaged mean soil loss (F) (In/Hr) = 0.134
Minimum soil loss rate ((In/Hr)) = 0.067
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 0.07 0.014 ( 0.238) 0.001 0.013
2 0.17 0.07 0.014 ( 0.237) 0.001 0.013
3 0.25 0.07 0.014 ( 0.236) 0.001 0.013
4 0.33 0.10 0.021 ( 0.235) 0.002 0.019
5 0.42 0.10 0.021 ( 0.234) 0.002 0.019
6 0.50 0.10 0.021 ( 0.233) 0.002 0.019
7 0.58 0.10 0.021 ( 0.232) 0.002 0.019
8 0.67 0.10 0.021 ( 0.231) 0.002 0.019
9 0.75 0.10 0.021 ( 0.230) 0.002 0.019
10 0.83 0.13 0.028 ( 0.230) 0.003 0.025
11 0.92 0.13 0.028 ( 0.229) 0.003 0.025
12 1.00 0.13 0.028 ( 0.228) 0.003 0.025
13 1.08 0.10 0.021 ( 0.227) 0.002 0.019
14 1.17 0.10 0.021 ( 0.226) 0.002 0.019
15 1.25 0.10 0.021 ( 0.225) 0.002 0.019
16 1.33 0.10 0.021 ( 0.224) 0.002 0.019
17 1.42 0.10 0.021 ( 0.223) 0.002 0.019
18 1.50 0.10 0.021 ( 0.222) 0.002 0.019
19 1.58 0.10 0.021 ( 0.222) 0.002 0.019
20 1.67 0.10 0.021 ( 0.221) 0.002 0.019
21 1.75 0.10 0.021 ( 0.220) 0.002 0.019
22 1.83 0.13 0.028 ( 0.219) 0.003 0.025
23 1.92 0.13 0.028 ( 0.218) 0.003 0.025
24 2.00 0.13 0.028 ( 0.217) 0.003 0.025
25 2.08 0.13 0.028 ( 0.216) 0.003 0.025
26 2.17 0.13 0.028 ( 0.215) 0.003 0.025
27 2.25 0.13 0.028 ( 0.214) 0.003 0.025
28 2.33 0.13 0.028 ( 0.214) 0.003 0.025
29 2.42 0.13 0.028 ( 0.213) 0.003 0.025
30 2.50 0.13 0.028 ( 0.212) 0.003 0.025
31 2.58 0.17 0.035 ( 0.211) 0.003 0.031
32 2.67 0.17 0.035 ( 0.210) 0.003 0.031
33 2.75 0.17 0.035 ( 0.209) 0.003 0.031
34 2.83 0.17 0.035 ( 0.208) 0.003 0.031
35 2.92 0.17 0.035 ( 0.208) 0.003 0.031
36 3.00 0.17 0.035 ( 0.207) 0.003 0.031
37 3.08 0.17 0.035 ( 0.206) 0.003 0.031
38 3.17 0.17 0.035 ( 0.205) 0.003 0.031
39 3.25 0.17 0.035 ( 0.204) 0.003 0.031
40 3.33 0.17 0.035 ( 0.203) 0.003 0.031
41 3.42 0.17 0.035 ( 0.202) 0.003 0.031
42 3.50 0.17 0.035 ( 0.202) 0.003 0.031
43 3.58 0.17 0.035 ( 0.201) 0.003 0.031
44 3.67 0.17 0.035 ( 0.200) 0.003 0.031
45 3.75 0.17 0.035 ( 0.199) 0.003 0.031
46 3.83 0.20 0.042 ( 0.198) 0.004 0.038

Page 2 ends

F.1.k
Packet Pg. 1845 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
47 3.92 0.20 0.042 ( 0.197) 0.004 0.038
48 4.00 0.20 0.042 ( 0.197) 0.004 0.038
49 4.08 0.20 0.042 ( 0.196) 0.004 0.038
50 4.17 0.20 0.042 ( 0.195) 0.004 0.038
51 4.25 0.20 0.042 ( 0.194) 0.004 0.038
52 4.33 0.23 0.049 ( 0.193) 0.005 0.044
53 4.42 0.23 0.049 ( 0.192) 0.005 0.044
54 4.50 0.23 0.049 ( 0.192) 0.005 0.044
55 4.58 0.23 0.049 ( 0.191) 0.005 0.044
56 4.67 0.23 0.049 ( 0.190) 0.005 0.044
57 4.75 0.23 0.049 ( 0.189) 0.005 0.044
58 4.83 0.27 0.056 ( 0.188) 0.006 0.050
59 4.92 0.27 0.056 ( 0.187) 0.006 0.050
60 5.00 0.27 0.056 ( 0.187) 0.006 0.050
61 5.08 0.20 0.042 ( 0.186) 0.004 0.038
62 5.17 0.20 0.042 ( 0.185) 0.004 0.038
63 5.25 0.20 0.042 ( 0.184) 0.004 0.038
64 5.33 0.23 0.049 ( 0.183) 0.005 0.044
65 5.42 0.23 0.049 ( 0.183) 0.005 0.044
66 5.50 0.23 0.049 ( 0.182) 0.005 0.044
67 5.58 0.27 0.056 ( 0.181) 0.006 0.050
68 5.67 0.27 0.056 ( 0.180) 0.006 0.050
69 5.75 0.27 0.056 ( 0.179) 0.006 0.050
70 5.83 0.27 0.056 ( 0.179) 0.006 0.050
71 5.92 0.27 0.056 ( 0.178) 0.006 0.050
72 6.00 0.27 0.056 ( 0.177) 0.006 0.050
73 6.08 0.30 0.063 ( 0.176) 0.006 0.057
74 6.17 0.30 0.063 ( 0.175) 0.006 0.057
75 6.25 0.30 0.063 ( 0.175) 0.006 0.057
76 6.33 0.30 0.063 ( 0.174) 0.006 0.057
77 6.42 0.30 0.063 ( 0.173) 0.006 0.057
78 6.50 0.30 0.063 ( 0.172) 0.006 0.057
79 6.58 0.33 0.070 ( 0.172) 0.007 0.063
80 6.67 0.33 0.070 ( 0.171) 0.007 0.063
81 6.75 0.33 0.070 ( 0.170) 0.007 0.063
82 6.83 0.33 0.070 ( 0.169) 0.007 0.063
83 6.92 0.33 0.070 ( 0.169) 0.007 0.063
84 7.00 0.33 0.070 ( 0.168) 0.007 0.063
85 7.08 0.33 0.070 ( 0.167) 0.007 0.063
86 7.17 0.33 0.070 ( 0.166) 0.007 0.063
87 7.25 0.33 0.070 ( 0.165) 0.007 0.063
88 7.33 0.37 0.077 ( 0.165) 0.008 0.069
89 7.42 0.37 0.077 ( 0.164) 0.008 0.069
90 7.50 0.37 0.077 ( 0.163) 0.008 0.069
91 7.58 0.40 0.084 ( 0.162) 0.008 0.076
92 7.67 0.40 0.084 ( 0.162) 0.008 0.076
93 7.75 0.40 0.084 ( 0.161) 0.008 0.076
94 7.83 0.43 0.091 ( 0.160) 0.009 0.082
95 7.92 0.43 0.091 ( 0.159) 0.009 0.082
96 8.00 0.43 0.091 ( 0.159) 0.009 0.082
97 8.08 0.50 0.105 ( 0.158) 0.010 0.094
98 8.17 0.50 0.105 ( 0.157) 0.010 0.094
99 8.25 0.50 0.105 ( 0.157) 0.010 0.094
100 8.33 0.50 0.105 ( 0.156) 0.010 0.094
101 8.42 0.50 0.105 ( 0.155) 0.010 0.094
102 8.50 0.50 0.105 ( 0.154) 0.010 0.094
103 8.58 0.53 0.112 ( 0.154) 0.011 0.101
104 8.67 0.53 0.112 ( 0.153) 0.011 0.101
105 8.75 0.53 0.112 ( 0.152) 0.011 0.101
106 8.83 0.57 0.119 ( 0.151) 0.012 0.107
107 8.92 0.57 0.119 ( 0.151) 0.012 0.107
108 9.00 0.57 0.119 ( 0.150) 0.012 0.107
109 9.08 0.63 0.133 ( 0.149) 0.013 0.120
110 9.17 0.63 0.133 ( 0.149) 0.013 0.120
111 9.25 0.63 0.133 ( 0.148) 0.013 0.120
112 9.33 0.67 0.140 ( 0.147) 0.014 0.126
113 9.42 0.67 0.140 ( 0.147) 0.014 0.126
114 9.50 0.67 0.140 ( 0.146) 0.014 0.126
115 9.58 0.70 0.147 ( 0.145) 0.015 0.132
116 9.67 0.70 0.147 ( 0.144) 0.015 0.132
117 9.75 0.70 0.147 ( 0.144) 0.015 0.132
118 9.83 0.73 0.154 ( 0.143) 0.015 0.139
119 9.92 0.73 0.154 ( 0.142) 0.015 0.139
120 10.00 0.73 0.154 ( 0.142) 0.015 0.139
121 10.08 0.50 0.105 ( 0.141) 0.010 0.094
122 10.17 0.50 0.105 ( 0.140) 0.010 0.094
123 10.25 0.50 0.105 ( 0.140) 0.010 0.094

Page 3 ends

F.1.k
Packet Pg. 1846 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
124 10.33 0.50 0.105 ( 0.139) 0.010 0.094
125 10.42 0.50 0.105 ( 0.138) 0.010 0.094
126 10.50 0.50 0.105 ( 0.138) 0.010 0.094
127 10.58 0.67 0.140 ( 0.137) 0.014 0.126
128 10.67 0.67 0.140 ( 0.136) 0.014 0.126
129 10.75 0.67 0.140 ( 0.136) 0.014 0.126
130 10.83 0.67 0.140 ( 0.135) 0.014 0.126
131 10.92 0.67 0.140 ( 0.134) 0.014 0.126
132 11.00 0.67 0.140 ( 0.134) 0.014 0.126
133 11.08 0.63 0.133 ( 0.133) 0.013 0.120
134 11.17 0.63 0.133 ( 0.132) 0.013 0.120
135 11.25 0.63 0.133 ( 0.132) 0.013 0.120
136 11.33 0.63 0.133 ( 0.131) 0.013 0.120
137 11.42 0.63 0.133 ( 0.130) 0.013 0.120
138 11.50 0.63 0.133 ( 0.130) 0.013 0.120
139 11.58 0.57 0.119 ( 0.129) 0.012 0.107
140 11.67 0.57 0.119 ( 0.128) 0.012 0.107
141 11.75 0.57 0.119 ( 0.128) 0.012 0.107
142 11.83 0.60 0.126 ( 0.127) 0.013 0.113
143 11.92 0.60 0.126 ( 0.126) 0.013 0.113
144 12.00 0.60 0.126 ( 0.126) 0.013 0.113
145 12.08 0.83 0.175 ( 0.125) 0.017 0.157
146 12.17 0.83 0.175 ( 0.125) 0.017 0.157
147 12.25 0.83 0.175 ( 0.124) 0.017 0.157
148 12.33 0.87 0.182 ( 0.123) 0.018 0.164
149 12.42 0.87 0.182 ( 0.123) 0.018 0.164
150 12.50 0.87 0.182 ( 0.122) 0.018 0.164
151 12.58 0.93 0.196 ( 0.121) 0.020 0.176
152 12.67 0.93 0.196 ( 0.121) 0.020 0.176
153 12.75 0.93 0.196 ( 0.120) 0.020 0.176
154 12.83 0.97 0.203 ( 0.120) 0.020 0.183
155 12.92 0.97 0.203 ( 0.119) 0.020 0.183
156 13.00 0.97 0.203 ( 0.118) 0.020 0.183
157 13.08 1.13 0.238 ( 0.118) 0.024 0.214
158 13.17 1.13 0.238 ( 0.117) 0.024 0.214
159 13.25 1.13 0.238 ( 0.117) 0.024 0.214
160 13.33 1.13 0.238 ( 0.116) 0.024 0.214
161 13.42 1.13 0.238 ( 0.115) 0.024 0.214
162 13.50 1.13 0.238 ( 0.115) 0.024 0.214
163 13.58 0.77 0.161 ( 0.114) 0.016 0.145
164 13.67 0.77 0.161 ( 0.114) 0.016 0.145
165 13.75 0.77 0.161 ( 0.113) 0.016 0.145
166 13.83 0.77 0.161 ( 0.113) 0.016 0.145
167 13.92 0.77 0.161 ( 0.112) 0.016 0.145
168 14.00 0.77 0.161 ( 0.111) 0.016 0.145
169 14.08 0.90 0.189 ( 0.111) 0.019 0.170
170 14.17 0.90 0.189 ( 0.110) 0.019 0.170
171 14.25 0.90 0.189 ( 0.110) 0.019 0.170
172 14.33 0.87 0.182 ( 0.109) 0.018 0.164
173 14.42 0.87 0.182 ( 0.109) 0.018 0.164
174 14.50 0.87 0.182 ( 0.108) 0.018 0.164
175 14.58 0.87 0.182 ( 0.107) 0.018 0.164
176 14.67 0.87 0.182 ( 0.107) 0.018 0.164
177 14.75 0.87 0.182 ( 0.106) 0.018 0.164
178 14.83 0.83 0.175 ( 0.106) 0.017 0.157
179 14.92 0.83 0.175 ( 0.105) 0.017 0.157
180 15.00 0.83 0.175 ( 0.105) 0.017 0.157
181 15.08 0.80 0.168 ( 0.104) 0.017 0.151
182 15.17 0.80 0.168 ( 0.104) 0.017 0.151
183 15.25 0.80 0.168 ( 0.103) 0.017 0.151
184 15.33 0.77 0.161 ( 0.103) 0.016 0.145
185 15.42 0.77 0.161 ( 0.102) 0.016 0.145
186 15.50 0.77 0.161 ( 0.102) 0.016 0.145
187 15.58 0.63 0.133 ( 0.101) 0.013 0.120
188 15.67 0.63 0.133 ( 0.101) 0.013 0.120
189 15.75 0.63 0.133 ( 0.100) 0.013 0.120
190 15.83 0.63 0.133 ( 0.100) 0.013 0.120
191 15.92 0.63 0.133 ( 0.099) 0.013 0.120
192 16.00 0.63 0.133 ( 0.099) 0.013 0.120
193 16.08 0.13 0.028 ( 0.098) 0.003 0.025
194 16.17 0.13 0.028 ( 0.098) 0.003 0.025
195 16.25 0.13 0.028 ( 0.097) 0.003 0.025
196 16.33 0.13 0.028 ( 0.097) 0.003 0.025
197 16.42 0.13 0.028 ( 0.096) 0.003 0.025
198 16.50 0.13 0.028 ( 0.096) 0.003 0.025
199 16.58 0.10 0.021 ( 0.095) 0.002 0.019
200 16.67 0.10 0.021 ( 0.095) 0.002 0.019

Page 4 ends

F.1.k
Packet Pg. 1847 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
201 16.75 0.10 0.021 ( 0.094) 0.002 0.019
202 16.83 0.10 0.021 ( 0.094) 0.002 0.019
203 16.92 0.10 0.021 ( 0.093) 0.002 0.019
204 17.00 0.10 0.021 ( 0.093) 0.002 0.019
205 17.08 0.17 0.035 ( 0.092) 0.003 0.031
206 17.17 0.17 0.035 ( 0.092) 0.003 0.031
207 17.25 0.17 0.035 ( 0.091) 0.003 0.031
208 17.33 0.17 0.035 ( 0.091) 0.003 0.031
209 17.42 0.17 0.035 ( 0.090) 0.003 0.031
210 17.50 0.17 0.035 ( 0.090) 0.003 0.031
211 17.58 0.17 0.035 ( 0.089) 0.003 0.031
212 17.67 0.17 0.035 ( 0.089) 0.003 0.031
213 17.75 0.17 0.035 ( 0.089) 0.003 0.031
214 17.83 0.13 0.028 ( 0.088) 0.003 0.025
215 17.92 0.13 0.028 ( 0.088) 0.003 0.025
216 18.00 0.13 0.028 ( 0.087) 0.003 0.025
217 18.08 0.13 0.028 ( 0.087) 0.003 0.025
218 18.17 0.13 0.028 ( 0.086) 0.003 0.025
219 18.25 0.13 0.028 ( 0.086) 0.003 0.025
220 18.33 0.13 0.028 ( 0.086) 0.003 0.025
221 18.42 0.13 0.028 ( 0.085) 0.003 0.025
222 18.50 0.13 0.028 ( 0.085) 0.003 0.025
223 18.58 0.10 0.021 ( 0.084) 0.002 0.019
224 18.67 0.10 0.021 ( 0.084) 0.002 0.019
225 18.75 0.10 0.021 ( 0.084) 0.002 0.019
226 18.83 0.07 0.014 ( 0.083) 0.001 0.013
227 18.92 0.07 0.014 ( 0.083) 0.001 0.013
228 19.00 0.07 0.014 ( 0.082) 0.001 0.013
229 19.08 0.10 0.021 ( 0.082) 0.002 0.019
230 19.17 0.10 0.021 ( 0.082) 0.002 0.019
231 19.25 0.10 0.021 ( 0.081) 0.002 0.019
232 19.33 0.13 0.028 ( 0.081) 0.003 0.025
233 19.42 0.13 0.028 ( 0.080) 0.003 0.025
234 19.50 0.13 0.028 ( 0.080) 0.003 0.025
235 19.58 0.10 0.021 ( 0.080) 0.002 0.019
236 19.67 0.10 0.021 ( 0.079) 0.002 0.019
237 19.75 0.10 0.021 ( 0.079) 0.002 0.019
238 19.83 0.07 0.014 ( 0.079) 0.001 0.013
239 19.92 0.07 0.014 ( 0.078) 0.001 0.013
240 20.00 0.07 0.014 ( 0.078) 0.001 0.013
241 20.08 0.10 0.021 ( 0.078) 0.002 0.019
242 20.17 0.10 0.021 ( 0.077) 0.002 0.019
243 20.25 0.10 0.021 ( 0.077) 0.002 0.019
244 20.33 0.10 0.021 ( 0.077) 0.002 0.019
245 20.42 0.10 0.021 ( 0.076) 0.002 0.019
246 20.50 0.10 0.021 ( 0.076) 0.002 0.019
247 20.58 0.10 0.021 ( 0.076) 0.002 0.019
248 20.67 0.10 0.021 ( 0.075) 0.002 0.019
249 20.75 0.10 0.021 ( 0.075) 0.002 0.019
250 20.83 0.07 0.014 ( 0.075) 0.001 0.013
251 20.92 0.07 0.014 ( 0.074) 0.001 0.013
252 21.00 0.07 0.014 ( 0.074) 0.001 0.013
253 21.08 0.10 0.021 ( 0.074) 0.002 0.019
254 21.17 0.10 0.021 ( 0.073) 0.002 0.019
255 21.25 0.10 0.021 ( 0.073) 0.002 0.019
256 21.33 0.07 0.014 ( 0.073) 0.001 0.013
257 21.42 0.07 0.014 ( 0.073) 0.001 0.013
258 21.50 0.07 0.014 ( 0.072) 0.001 0.013
259 21.58 0.10 0.021 ( 0.072) 0.002 0.019
260 21.67 0.10 0.021 ( 0.072) 0.002 0.019
261 21.75 0.10 0.021 ( 0.072) 0.002 0.019
262 21.83 0.07 0.014 ( 0.071) 0.001 0.013
263 21.92 0.07 0.014 ( 0.071) 0.001 0.013
264 22.00 0.07 0.014 ( 0.071) 0.001 0.013
265 22.08 0.10 0.021 ( 0.071) 0.002 0.019
266 22.17 0.10 0.021 ( 0.070) 0.002 0.019
267 22.25 0.10 0.021 ( 0.070) 0.002 0.019
268 22.33 0.07 0.014 ( 0.070) 0.001 0.013
269 22.42 0.07 0.014 ( 0.070) 0.001 0.013
270 22.50 0.07 0.014 ( 0.069) 0.001 0.013
271 22.58 0.07 0.014 ( 0.069) 0.001 0.013
272 22.67 0.07 0.014 ( 0.069) 0.001 0.013
273 22.75 0.07 0.014 ( 0.069) 0.001 0.013
274 22.83 0.07 0.014 ( 0.069) 0.001 0.013
275 22.92 0.07 0.014 ( 0.069) 0.001 0.013
276 23.00 0.07 0.014 ( 0.068) 0.001 0.013
277 23.08 0.07 0.014 ( 0.068) 0.001 0.013

Page 5 ends

F.1.k
Packet Pg. 1848 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
278 23.17 0.07 0.014 ( 0.068) 0.001 0.013
279 23.25 0.07 0.014 ( 0.068) 0.001 0.013
280 23.33 0.07 0.014 ( 0.068) 0.001 0.013
281 23.42 0.07 0.014 ( 0.068) 0.001 0.013
282 23.50 0.07 0.014 ( 0.068) 0.001 0.013
283 23.58 0.07 0.014 ( 0.067) 0.001 0.013
284 23.67 0.07 0.014 ( 0.067) 0.001 0.013
285 23.75 0.07 0.014 ( 0.067) 0.001 0.013
286 23.83 0.07 0.014 ( 0.067) 0.001 0.013
287 23.92 0.07 0.014 ( 0.067) 0.001 0.013
288 24.00 0.07 0.014 ( 0.067) 0.001 0.013
(Loss Rate Not Used)
Sum = 100.0 Sum = 18.9
Flood volume = Effective rainfall 1.57(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 8.8(Ac.Ft)
Total soil loss = 0.17(In)
Total soil loss = 0.978(Ac.Ft)
Total rainfall = 1.75(In)
Flood volume = 383577.2 Cubic Feet
Total soil loss = 42619.7 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 14.434(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 24 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 5.0 10.0 15.0 20.0
----------------------------------------------------------------------- 0+ 5 0.0012 0.18 Q | | | |
0+10 0.0053 0.59 VQ | | | |
0+15 0.0102 0.72 VQ | | | |
0+20 0.0162 0.86 VQ | | | |
0+25 0.0238 1.10 V Q | | | |
0+30 0.0320 1.19 V Q | | | |
0+35 0.0404 1.23 V Q | | | |
0+40 0.0491 1.26 V Q | | | |
0+45 0.0578 1.27 V Q | | | |
0+50 0.0672 1.36 V Q | | | |
0+55 0.0780 1.57 V Q | | | |
1+ 0 0.0893 1.64 V Q | | | |
1+ 5 0.1002 1.58 V Q | | | |
1+10 0.1098 1.39 V Q | | | |
1+15 0.1189 1.33 V Q | | | |
1+20 0.1280 1.31 V Q | | | |
1+25 0.1369 1.30 V Q | | | |
1+30 0.1458 1.29 V Q | | | |
1+35 0.1547 1.28 V Q | | | |
1+40 0.1635 1.28 V Q | | | |
1+45 0.1723 1.28 V Q | | | |
1+50 0.1817 1.37 V Q | | | |
1+55 0.1925 1.57 V Q | | | |
2+ 0 0.2038 1.64 V Q | | | |
2+ 5 0.2153 1.67 V Q | | | |
2+10 0.2269 1.68 |V Q | | | |
2+15 0.2385 1.69 |V Q | | | |
2+20 0.2502 1.70 |V Q | | | |
2+25 0.2620 1.70 |V Q | | | |
2+30 0.2737 1.70 |V Q | | | |
2+35 0.2861 1.79 |V Q | | | |
2+40 0.2998 2.00 |V Q | | | |
2+45 0.3140 2.06 |V Q | | | |
2+50 0.3285 2.09 |V Q | | | |
2+55 0.3430 2.11 |V Q | | | |
3+ 0 0.3576 2.12 |V Q | | | |
3+ 5 0.3722 2.13 |V Q | | | |
3+10 0.3869 2.13 |V Q | | | |
3+15 0.4016 2.13 |V Q | | | |
3+20 0.4163 2.13 |V Q | | | |
3+25 0.4309 2.13 |V Q | | | |
3+30 0.4456 2.13 | V Q | | | |
3+35 0.4603 2.13 | V Q | | | |
3+40 0.4750 2.13 | V Q | | | |
3+45 0.4896 2.13 | V Q | | | |

Page 6 ends

F.1.k
Packet Pg. 1849 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
3+50 0.5049 2.22 | V Q | | | |
3+55 0.5216 2.43 | V Q | | | |
4+ 0 0.5388 2.49 | V Q | | | |
4+ 5 0.5561 2.52 | V Q | | | |
4+10 0.5736 2.54 | V Q | | | |
4+15 0.5911 2.55 | V Q | | | |
4+20 0.6093 2.64 | V Q | | | |
4+25 0.6290 2.85 | V Q | | | |
4+30 0.6490 2.92 | V Q | | | |
4+35 0.6693 2.95 | V Q | | | |
4+40 0.6897 2.96 | V Q | | | |
4+45 0.7102 2.97 | V Q | | | |
4+50 0.7313 3.07 | V Q | | | |
4+55 0.7539 3.28 | V Q | | | |
5+ 0 0.7769 3.34 | V Q | | | |
5+ 5 0.7989 3.20 | V Q | | | |
5+10 0.8182 2.80 | V Q | | | |
5+15 0.8366 2.68 | V Q | | | |
5+20 0.8553 2.72 | V Q | | | |
5+25 0.8753 2.90 | V Q | | | |
5+30 0.8955 2.94 | VQ | | | |
5+35 0.9165 3.04 | V Q | | | |
5+40 0.9389 3.26 | V Q | | | |
5+45 0.9619 3.33 | V Q | | | |
5+50 0.9850 3.37 | V Q | | | |
5+55 1.0084 3.39 | V Q | | | |
6+ 0 1.0318 3.40 | V Q | | | |
6+ 5 1.0558 3.49 | V Q | | | |
6+10 1.0813 3.70 | V Q | | | |
6+15 1.1073 3.77 | V Q | | | |
6+20 1.1335 3.80 | V Q | | | |
6+25 1.1597 3.81 | V Q | | | |
6+30 1.1861 3.82 | V Q | | | |
6+35 1.2130 3.92 | V Q | | | |
6+40 1.2415 4.13 | V Q | | | |
6+45 1.2704 4.19 | V Q | | | |
6+50 1.2995 4.22 | V Q | | | |
6+55 1.3287 4.24 | V Q | | | |
7+ 0 1.3580 4.25 | V Q | | | |
7+ 5 1.3873 4.26 | V Q | | | |
7+10 1.4166 4.26 | V Q | | | |
7+15 1.4460 4.26 | V Q | | | |
7+20 1.4759 4.35 | V Q | | | |
7+25 1.5073 4.56 | V Q| | | |
7+30 1.5392 4.62 | V Q| | | |
7+35 1.5718 4.74 | V Q| | | |
7+40 1.6060 4.96 | V Q| | | |
7+45 1.6406 5.04 | V Q | | |
7+50 1.6762 5.16 | V Q | | |
7+55 1.7133 5.39 | V Q | | |
8+ 0 1.7509 5.46 | V Q | | |
8+ 5 1.7900 5.67 | V |Q | | |
8+10 1.8320 6.11 | V | Q | | |
8+15 1.8751 6.25 | V | Q | | |
8+20 1.9185 6.31 | V | Q | | |
8+25 1.9623 6.35 | V | Q | | |
8+30 2.0061 6.37 | V| Q | | |
8+35 2.0507 6.47 | V| Q | | |
8+40 2.0968 6.69 | V| Q | | |
8+45 2.1433 6.75 | V| Q | | |
8+50 2.1906 6.87 | V| Q | | |
8+55 2.2394 7.09 | V Q | | |
9+ 0 2.2888 7.17 | V Q | | |
9+ 5 2.3396 7.38 | V Q | | |
9+10 2.3934 7.81 | V Q | | |
9+15 2.4482 7.95 | |V Q | | |
9+20 2.5040 8.10 | |V Q | | |
9+25 2.5615 8.35 | |V Q | | |
9+30 2.6196 8.43 | |V Q | | |
9+35 2.6786 8.56 | | V Q | | |
9+40 2.7391 8.80 | | V Q | | |
9+45 2.8002 8.87 | | V Q | | |
9+50 2.8622 8.99 | | V Q | | |
9+55 2.9257 9.22 | | V Q | | |
10+ 0 2.9898 9.30 | | V Q | | |
10+ 5 3.0498 8.72 | | V Q | | |
10+10 3.1000 7.29 | | Q | | |

Page 7 ends

F.1.k
Packet Pg. 1850 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
10+15 3.1472 6.85 | | QV | | |
10+20 3.1930 6.65 | | QV | | |
10+25 3.2381 6.55 | | QV | | |
10+30 3.2826 6.47 | | Q V | | |
10+35 3.3299 6.87 | | Q V | | |
10+40 3.3841 7.87 | | Q | | |
10+45 3.4405 8.19 | | VQ | | |
10+50 3.4979 8.33 | | VQ | | |
10+55 3.5559 8.42 | | Q | | |
11+ 0 3.6142 8.47 | | Q | | |
11+ 5 3.6721 8.41 | | Q | | |
11+10 3.7288 8.23 | | Q | | |
11+15 3.7850 8.16 | | QV | | |
11+20 3.8411 8.14 | | QV | | |
11+25 3.8970 8.12 | | QV | | |
11+30 3.9528 8.11 | | QV | | |
11+35 4.0074 7.93 | | Q V | | |
11+40 4.0591 7.51 | | Q V | | |
11+45 4.1099 7.38 | | Q V | | |
11+50 4.1610 7.41 | | Q V | | |
11+55 4.2132 7.58 | | Q V| | |
12+ 0 4.2657 7.63 | | Q V| | |
12+ 5 4.3226 8.26 | | Q V| | |
12+10 4.3895 9.72 | | Q| | |
12+15 4.4596 10.17 | | Q | |
12+20 4.5317 10.47 | | Q | |
12+25 4.6061 10.80 | | VQ | |
12+30 4.6814 10.93 | | |Q | |
12+35 4.7584 11.18 | | |VQ | |
12+40 4.8387 11.65 | | |V Q | |
12+45 4.9198 11.79 | | | VQ | |
12+50 5.0021 11.94 | | | VQ | |
12+55 5.0860 12.19 | | | VQ | |
13+ 0 5.1705 12.27 | | | VQ | |
13+ 5 5.2583 12.75 | | | V Q | |
13+10 5.3535 13.81 | | | V Q | |
13+15 5.4509 14.14 | | | V Q | |
13+20 5.5493 14.30 | | | V Q | |
13+25 5.6484 14.38 | | | V Q | |
13+30 5.7478 14.43 | | | V Q | |
13+35 5.8407 13.50 | | | Q | |
13+40 5.9182 11.24 | | | Q V | |
13+45 5.9908 10.54 | | |Q V | |
13+50 6.0611 10.22 | | Q V | |
13+55 6.1303 10.04 | | Q V | |
14+ 0 6.1987 9.93 | | Q| V | |
14+ 5 6.2690 10.21 | | Q V | |
14+10 6.3446 10.98 | | |Q V | |
14+15 6.4220 11.24 | | | Q V| |
14+20 6.4996 11.27 | | | Q V| |
14+25 6.5763 11.12 | | | Q V| |
14+30 6.6527 11.10 | | | Q V |
14+35 6.7292 11.10 | | | Q V |
14+40 6.8056 11.10 | | | Q V |
14+45 6.8820 11.09 | | | Q |V |
14+50 6.9578 11.00 | | |Q |V |
14+55 7.0321 10.79 | | |Q |V |
15+ 0 7.1059 10.72 | | |Q | V |
15+ 5 7.1789 10.61 | | |Q | V |
15+10 7.2504 10.38 | | Q | V |
15+15 7.3214 10.31 | | Q | V |
15+20 7.3916 10.18 | | Q | V |
15+25 7.4601 9.96 | | Q| | V |
15+30 7.5282 9.88 | | Q| | V |
15+35 7.5936 9.49 | | Q | | V |
15+40 7.6531 8.64 | | Q | | V |
15+45 7.7108 8.38 | | Q | | V |
15+50 7.7676 8.25 | | Q | | V |
15+55 7.8240 8.18 | | Q | | V |
16+ 0 7.8801 8.14 | | Q | | V |
16+ 5 7.9269 6.80 | | Q | | V |
16+10 7.9522 3.67 | Q | | | V |
16+15 7.9708 2.71 | Q | | | V |
16+20 7.9865 2.27 | Q | | | V |
16+25 8.0005 2.03 | Q | | | V |
16+30 8.0134 1.88 | Q | | | V |
16+35 8.0251 1.69 | Q | | | V |

Page 8 ends

F.1.k
Packet Pg. 1851 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
16+40 8.0348 1.41 | Q | | | V |
16+45 8.0441 1.35 | Q | | | V |
16+50 8.0531 1.32 | Q | | | V |
16+55 8.0621 1.30 | Q | | | V |
17+ 0 8.0710 1.29 | Q | | | V |
17+ 5 8.0810 1.46 | Q | | | V |
17+10 8.0939 1.87 | Q | | | V |
17+15 8.1076 2.00 | Q | | | V |
17+20 8.1218 2.06 | Q | | | V |
17+25 8.1362 2.09 | Q | | | V |
17+30 8.1507 2.11 | Q | | | V |
17+35 8.1653 2.12 | Q | | | V |
17+40 8.1800 2.13 | Q | | | V |
17+45 8.1946 2.13 | Q | | | V |
17+50 8.2087 2.04 | Q | | | V |
17+55 8.2214 1.84 | Q | | | V |
18+ 0 8.2336 1.77 | Q | | | V |
18+ 5 8.2456 1.74 | Q | | | V |
18+10 8.2575 1.73 | Q | | | V |
18+15 8.2693 1.72 | Q | | | V |
18+20 8.2810 1.71 | Q | | | V |
18+25 8.2928 1.70 | Q | | | V |
18+30 8.3045 1.70 | Q | | | V |
18+35 8.3157 1.62 | Q | | | V |
18+40 8.3254 1.41 | Q | | | V |
18+45 8.3346 1.35 | Q | | | V |
18+50 8.3431 1.23 | Q | | | V |
18+55 8.3500 1.01 | Q | | | V |
19+ 0 8.3564 0.93 |Q | | | V |
19+ 5 8.3632 0.98 |Q | | | V |
19+10 8.3713 1.17 | Q | | | V |
19+15 8.3797 1.22 | Q | | | V |
19+20 8.3889 1.33 | Q | | | V |
19+25 8.3996 1.55 | Q | | | V |
19+30 8.4108 1.63 | Q | | | V |
19+35 8.4216 1.57 | Q | | | V |
19+40 8.4312 1.39 | Q | | | V |
19+45 8.4403 1.33 | Q | | | V |
19+50 8.4488 1.22 | Q | | | V |
19+55 8.4557 1.01 | Q | | | V |
20+ 0 8.4621 0.93 |Q | | | V |
20+ 5 8.4689 0.98 |Q | | | V |
20+10 8.4769 1.17 | Q | | | V |
20+15 8.4854 1.22 | Q | | | V |
20+20 8.4939 1.25 | Q | | | V |
20+25 8.5026 1.26 | Q | | | V |
20+30 8.5113 1.27 | Q | | | V |
20+35 8.5201 1.27 | Q | | | V |
20+40 8.5289 1.28 | Q | | | V |
20+45 8.5377 1.28 | Q | | | V |
20+50 8.5459 1.19 | Q | | | V |
20+55 8.5527 0.98 |Q | | | V |
21+ 0 8.5590 0.92 |Q | | | V |
21+ 5 8.5657 0.98 |Q | | | V |
21+10 8.5738 1.17 | Q | | | V |
21+15 8.5822 1.22 | Q | | | V |
21+20 8.5902 1.16 | Q | | | V|
21+25 8.5968 0.96 |Q | | | V|
21+30 8.6031 0.91 |Q | | | V|
21+35 8.6098 0.97 |Q | | | V|
21+40 8.6178 1.17 | Q | | | V|
21+45 8.6262 1.22 | Q | | | V|
21+50 8.6342 1.16 | Q | | | V|
21+55 8.6408 0.96 |Q | | | V|
22+ 0 8.6471 0.91 |Q | | | V|
22+ 5 8.6538 0.97 |Q | | | V|
22+10 8.6619 1.17 | Q | | | V|
22+15 8.6703 1.22 | Q | | | V|
22+20 8.6782 1.16 | Q | | | V|
22+25 8.6849 0.96 |Q | | | V|
22+30 8.6911 0.91 |Q | | | V|
22+35 8.6972 0.89 |Q | | | V|
22+40 8.7032 0.87 |Q | | | V|
22+45 8.7092 0.86 |Q | | | V|
22+50 8.7151 0.86 |Q | | | V|
22+55 8.7210 0.85 |Q | | | V|
23+ 0 8.7268 0.85 |Q | | | V|

Page 9 ends

F.1.k
Packet Pg. 1852 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR224
23+ 5 8.7327 0.85 |Q | | | V|
23+10 8.7386 0.85 |Q | | | V|
23+15 8.7444 0.85 |Q | | | V|
23+20 8.7503 0.85 |Q | | | V|
23+25 8.7562 0.85 |Q | | | V|
23+30 8.7621 0.85 |Q | | | V|
23+35 8.7679 0.85 |Q | | | V|
23+40 8.7738 0.85 |Q | | | V|
23+45 8.7797 0.85 |Q | | | V|
23+50 8.7855 0.85 |Q | | | V|
23+55 8.7914 0.85 |Q | | | V|
24+ 0 8.7973 0.85 |Q | | | V|
24+ 5 8.8019 0.68 |Q | | | V|
24+10 8.8037 0.26 Q | | | V|
24+15 8.8047 0.13 Q | | | V|
24+20 8.8052 0.08 Q | | | V|
24+25 8.8055 0.04 Q | | | V|
24+30 8.8056 0.02 Q | | | V|
24+35 8.8057 0.01 Q | | | V
-----------------------------------------------------------------------

Page 10 ends

F.1.k
Packet Pg. 1853 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR515
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR515.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 5-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 1 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 0.50 33.55
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.20 80.52
STORM EVENT (YEAR) = 5.00
Area Averaged 2-Year Rainfall = 0.500(In)
Area Averaged 100-Year Rainfall = 1.200(In)
Point rain (area averaged) = 0.664(In)
Areal adjustment factor = 99.94 %
Adjusted average point rain = 0.664(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-1 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 36.0 0.706 0.900 0.134 1.000 0.134
Sum (F) = 0.134

Page 1 ends

F.1.k
Packet Pg. 1854 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR515
Area averaged mean soil loss (F) (In/Hr) = 0.134
Minimum soil loss rate ((In/Hr)) = 0.067
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- Slope of intensity-duration curve for a 1 hour storm =0.5000 ---------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 4.20 0.334 ( 0.134) 0.033 0.301
2 0.17 4.30 0.342 ( 0.134) 0.034 0.308
3 0.25 5.00 0.398 ( 0.134) 0.040 0.358
4 0.33 5.00 0.398 ( 0.134) 0.040 0.358
5 0.42 5.80 0.462 ( 0.134) 0.046 0.416
6 0.50 6.50 0.518 ( 0.134) 0.052 0.466
7 0.58 7.40 0.589 ( 0.134) 0.059 0.530
8 0.67 8.60 0.685 ( 0.134) 0.068 0.616
9 0.75 12.30 0.979 ( 0.134) 0.098 0.881
10 0.83 29.10 2.317 0.134 ( 0.232) 2.183
11 0.92 6.80 0.541 ( 0.134) 0.054 0.487
12 1.00 5.00 0.398 ( 0.134) 0.040 0.358
(Loss Rate Not Used)
Sum = 100.0 Sum = 7.3
Flood volume = Effective rainfall 0.61(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 3.4(Ac.Ft)
Total soil loss = 0.06(In)
Total soil loss = 0.326(Ac.Ft)
Total rainfall = 0.66(In)
Flood volume = 147441.8 Cubic Feet
Total soil loss = 14181.9 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 93.308(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 25.0 50.0 75.0 100.0
----------------------------------------------------------------------- 0+ 5 0.0289 4.20 VQ | | | |
0+10 0.1268 14.21 |V Q | | | |
0+15 0.2521 18.20 | V Q | | | |
0+20 0.3989 21.31 | V Q | | | |
0+25 0.5602 23.43 | V Q| | | |
0+30 0.7445 26.76 | V Q | | |
0+35 0.9534 30.33 | |VQ | | |
0+40 1.1928 34.76 | | QV | | |
0+45 1.4847 42.38 | | QV | | |
0+50 1.9716 70.70 | | | V Q | |
0+55 2.6142 93.31 | | | V Q |

Page 2 ends

F.1.k
Packet Pg. 1855 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR515
1+ 0 2.9620 50.50 | | Q | V |
1+ 5 3.1755 31.00 | | Q | | V |
1+10 3.2719 13.99 | Q | | | V |
1+15 3.3262 7.88 | Q | | | V|
1+20 3.3579 4.61 |Q | | | V|
1+25 3.3776 2.86 |Q | | | V|
1+30 3.3828 0.75 Q | | | V|
1+35 3.3848 0.29 Q | | | V
-----------------------------------------------------------------------

Page 3 ends

F.1.k
Packet Pg. 1856 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR535
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR535.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 5-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 3 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 0.80 53.68
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.86 124.81
STORM EVENT (YEAR) = 5.00
Area Averaged 2-Year Rainfall = 0.800(In)
Area Averaged 100-Year Rainfall = 1.860(In)
Point rain (area averaged) = 1.048(In)
Areal adjustment factor = 99.97 %
Adjusted average point rain = 1.048(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-1 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 36.0 0.706 0.900 0.134 1.000 0.134
Sum (F) = 0.134

Page 1 ends

F.1.k
Packet Pg. 1857 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR535
Area averaged mean soil loss (F) (In/Hr) = 0.134
Minimum soil loss rate ((In/Hr)) = 0.067
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 1.30 0.163 ( 0.134) 0.016 0.147
2 0.17 1.30 0.163 ( 0.134) 0.016 0.147
3 0.25 1.10 0.138 ( 0.134) 0.014 0.124
4 0.33 1.50 0.189 ( 0.134) 0.019 0.170
5 0.42 1.50 0.189 ( 0.134) 0.019 0.170
6 0.50 1.80 0.226 ( 0.134) 0.023 0.204
7 0.58 1.50 0.189 ( 0.134) 0.019 0.170
8 0.67 1.80 0.226 ( 0.134) 0.023 0.204
9 0.75 1.80 0.226 ( 0.134) 0.023 0.204
10 0.83 1.50 0.189 ( 0.134) 0.019 0.170
11 0.92 1.60 0.201 ( 0.134) 0.020 0.181
12 1.00 1.80 0.226 ( 0.134) 0.023 0.204
13 1.08 2.20 0.277 ( 0.134) 0.028 0.249
14 1.17 2.20 0.277 ( 0.134) 0.028 0.249
15 1.25 2.20 0.277 ( 0.134) 0.028 0.249
16 1.33 2.00 0.252 ( 0.134) 0.025 0.226
17 1.42 2.60 0.327 ( 0.134) 0.033 0.294
18 1.50 2.70 0.340 ( 0.134) 0.034 0.306
19 1.58 2.40 0.302 ( 0.134) 0.030 0.272
20 1.67 2.70 0.340 ( 0.134) 0.034 0.306
21 1.75 3.30 0.415 ( 0.134) 0.041 0.373
22 1.83 3.10 0.390 ( 0.134) 0.039 0.351
23 1.92 2.90 0.365 ( 0.134) 0.036 0.328
24 2.00 3.00 0.377 ( 0.134) 0.038 0.340
25 2.08 3.10 0.390 ( 0.134) 0.039 0.351
26 2.17 4.20 0.528 ( 0.134) 0.053 0.475
27 2.25 5.00 0.629 ( 0.134) 0.063 0.566
28 2.33 3.50 0.440 ( 0.134) 0.044 0.396
29 2.42 6.80 0.855 ( 0.134) 0.086 0.770
30 2.50 7.30 0.918 ( 0.134) 0.092 0.826
31 2.58 8.20 1.031 ( 0.134) 0.103 0.928
32 2.67 5.90 0.742 ( 0.134) 0.074 0.668
33 2.75 2.00 0.252 ( 0.134) 0.025 0.226
34 2.83 1.80 0.226 ( 0.134) 0.023 0.204
35 2.92 1.80 0.226 ( 0.134) 0.023 0.204
36 3.00 0.60 0.075 ( 0.134) 0.008 0.068
(Loss Rate Not Used)
Sum = 100.0 Sum = 11.3
Flood volume = Effective rainfall 0.94(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 5.3(Ac.Ft)
Total soil loss = 0.10(In)
Total soil loss = 0.586(Ac.Ft)
Total rainfall = 1.05(In)
Flood volume = 229731.5 Cubic Feet
Total soil loss = 25525.7 Cubic Feet
--------------------------------------------------------------------

Page 2 ends

F.1.k
Packet Pg. 1858 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR535
Peak flow rate of this hydrograph = 54.514(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 15.0 30.0 45.0 60.0
----------------------------------------------------------------------- 0+ 5 0.0141 2.05 VQ | | | |
0+10 0.0616 6.90 V Q | | | |
0+15 0.1172 8.07 V Q | | | |
0+20 0.1767 8.64 |V Q | | | |
0+25 0.2475 10.28 |V Q | | | |
0+30 0.3257 11.35 | V Q | | | |
0+35 0.4103 12.29 | V Q | | | |
0+40 0.4943 12.19 | V Q | | | |
0+45 0.5850 13.17 | V Q | | | |
0+50 0.6745 13.00 | V Q | | | |
0+55 0.7585 12.20 | V Q | | | |
1+ 0 0.8454 12.61 | V Q | | | |
1+ 5 0.9418 14.00 | V Q| | | |
1+10 1.0498 15.69 | V Q | | |
1+15 1.1617 16.25 | V Q | | |
1+20 1.2732 16.19 | VQ | | |
1+25 1.3870 16.53 | VQ | | |
1+30 1.5165 18.80 | |VQ | | |
1+35 1.6497 19.34 | | Q | | |
1+40 1.7813 19.11 | | QV | | |
1+45 1.9260 21.02 | | Q | | |
1+50 2.0861 23.24 | | Q | | |
1+55 2.2446 23.01 | | Q V | | |
2+ 0 2.4002 22.60 | | Q V | | |
2+ 5 2.5587 23.00 | | Q V| | |
2+10 2.7321 25.18 | | Q V | |
2+15 2.9436 30.71 | | Q V | |
2+20 3.1686 32.67 | | |Q V | |
2+25 3.4013 33.78 | | | Q V | |
2+30 3.7174 45.90 | | | V Q |
2+35 4.0800 52.65 | | | V Q |
2+40 4.4554 54.51 | | | | V Q |
2+45 4.7444 41.95 | | | Q | V |
2+50 4.9206 25.60 | | Q | | V |
2+55 5.0567 19.76 | | Q | | V |
3+ 0 5.1632 15.46 | Q | | V|
3+ 5 5.2219 8.52 | Q | | | V|
3+10 5.2490 3.95 | Q | | | V|
3+15 5.2624 1.94 |Q | | | V|
3+20 5.2686 0.90 Q | | | V|
3+25 5.2719 0.48 Q | | | V|
3+30 5.2735 0.23 Q | | | V|
3+35 5.2739 0.06 Q | | | V
-----------------------------------------------------------------------

Page 3 ends

F.1.k
Packet Pg. 1859 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR565
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR565.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 5-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 6 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.15 77.16
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 2.50 167.75
STORM EVENT (YEAR) = 5.00
Area Averaged 2-Year Rainfall = 1.150(In)
Area Averaged 100-Year Rainfall = 2.500(In)
Point rain (area averaged) = 1.466(In)
Areal adjustment factor = 99.98 %
Adjusted average point rain = 1.466(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-1 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 36.0 0.706 0.900 0.134 1.000 0.134
Sum (F) = 0.134

Page 1 ends

F.1.k
Packet Pg. 1860 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR565
Area averaged mean soil loss (F) (In/Hr) = 0.134
Minimum soil loss rate ((In/Hr)) = 0.067
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 0.50 0.088 ( 0.134) 0.009 0.079
2 0.17 0.60 0.106 ( 0.134) 0.011 0.095
3 0.25 0.60 0.106 ( 0.134) 0.011 0.095
4 0.33 0.60 0.106 ( 0.134) 0.011 0.095
5 0.42 0.60 0.106 ( 0.134) 0.011 0.095
6 0.50 0.70 0.123 ( 0.134) 0.012 0.111
7 0.58 0.70 0.123 ( 0.134) 0.012 0.111
8 0.67 0.70 0.123 ( 0.134) 0.012 0.111
9 0.75 0.70 0.123 ( 0.134) 0.012 0.111
10 0.83 0.70 0.123 ( 0.134) 0.012 0.111
11 0.92 0.70 0.123 ( 0.134) 0.012 0.111
12 1.00 0.80 0.141 ( 0.134) 0.014 0.127
13 1.08 0.80 0.141 ( 0.134) 0.014 0.127
14 1.17 0.80 0.141 ( 0.134) 0.014 0.127
15 1.25 0.80 0.141 ( 0.134) 0.014 0.127
16 1.33 0.80 0.141 ( 0.134) 0.014 0.127
17 1.42 0.80 0.141 ( 0.134) 0.014 0.127
18 1.50 0.80 0.141 ( 0.134) 0.014 0.127
19 1.58 0.80 0.141 ( 0.134) 0.014 0.127
20 1.67 0.80 0.141 ( 0.134) 0.014 0.127
21 1.75 0.80 0.141 ( 0.134) 0.014 0.127
22 1.83 0.80 0.141 ( 0.134) 0.014 0.127
23 1.92 0.80 0.141 ( 0.134) 0.014 0.127
24 2.00 0.90 0.158 ( 0.134) 0.016 0.142
25 2.08 0.80 0.141 ( 0.134) 0.014 0.127
26 2.17 0.90 0.158 ( 0.134) 0.016 0.142
27 2.25 0.90 0.158 ( 0.134) 0.016 0.142
28 2.33 0.90 0.158 ( 0.134) 0.016 0.142
29 2.42 0.90 0.158 ( 0.134) 0.016 0.142
30 2.50 0.90 0.158 ( 0.134) 0.016 0.142
31 2.58 0.90 0.158 ( 0.134) 0.016 0.142
32 2.67 0.90 0.158 ( 0.134) 0.016 0.142
33 2.75 1.00 0.176 ( 0.134) 0.018 0.158
34 2.83 1.00 0.176 ( 0.134) 0.018 0.158
35 2.92 1.00 0.176 ( 0.134) 0.018 0.158
36 3.00 1.00 0.176 ( 0.134) 0.018 0.158
37 3.08 1.00 0.176 ( 0.134) 0.018 0.158
38 3.17 1.10 0.193 ( 0.134) 0.019 0.174
39 3.25 1.10 0.193 ( 0.134) 0.019 0.174
40 3.33 1.10 0.193 ( 0.134) 0.019 0.174
41 3.42 1.20 0.211 ( 0.134) 0.021 0.190
42 3.50 1.30 0.229 ( 0.134) 0.023 0.206
43 3.58 1.40 0.246 ( 0.134) 0.025 0.222
44 3.67 1.40 0.246 ( 0.134) 0.025 0.222
45 3.75 1.50 0.264 ( 0.134) 0.026 0.237
46 3.83 1.50 0.264 ( 0.134) 0.026 0.237

Page 2 ends

F.1.k
Packet Pg. 1861 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR565
47 3.92 1.60 0.281 ( 0.134) 0.028 0.253
48 4.00 1.60 0.281 ( 0.134) 0.028 0.253
49 4.08 1.70 0.299 ( 0.134) 0.030 0.269
50 4.17 1.80 0.317 ( 0.134) 0.032 0.285
51 4.25 1.90 0.334 ( 0.134) 0.033 0.301
52 4.33 2.00 0.352 ( 0.134) 0.035 0.317
53 4.42 2.10 0.369 ( 0.134) 0.037 0.332
54 4.50 2.10 0.369 ( 0.134) 0.037 0.332
55 4.58 2.20 0.387 ( 0.134) 0.039 0.348
56 4.67 2.30 0.405 ( 0.134) 0.040 0.364
57 4.75 2.40 0.422 ( 0.134) 0.042 0.380
58 4.83 2.40 0.422 ( 0.134) 0.042 0.380
59 4.92 2.50 0.440 ( 0.134) 0.044 0.396
60 5.00 2.60 0.457 ( 0.134) 0.046 0.412
61 5.08 3.10 0.545 ( 0.134) 0.055 0.491
62 5.17 3.60 0.633 ( 0.134) 0.063 0.570
63 5.25 3.90 0.686 ( 0.134) 0.069 0.617
64 5.33 4.20 0.739 ( 0.134) 0.074 0.665
65 5.42 4.70 0.827 ( 0.134) 0.083 0.744
66 5.50 5.60 0.985 ( 0.134) 0.099 0.887
67 5.58 1.90 0.334 ( 0.134) 0.033 0.301
68 5.67 0.90 0.158 ( 0.134) 0.016 0.142
69 5.75 0.60 0.106 ( 0.134) 0.011 0.095
70 5.83 0.50 0.088 ( 0.134) 0.009 0.079
71 5.92 0.30 0.053 ( 0.134) 0.005 0.047
72 6.00 0.20 0.035 ( 0.134) 0.004 0.032
(Loss Rate Not Used)
Sum = 100.0 Sum = 15.8
Flood volume = Effective rainfall 1.32(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 7.4(Ac.Ft)
Total soil loss = 0.15(In)
Total soil loss = 0.820(Ac.Ft)
Total rainfall = 1.47(In)
Flood volume = 321340.5 Cubic Feet
Total soil loss = 35704.5 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 49.464(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 12.5 25.0 37.5 50.0
----------------------------------------------------------------------- 0+ 5 0.0076 1.10 Q | | | |
0+10 0.0347 3.93 V Q | | | |
0+15 0.0709 5.26 V Q | | | |
0+20 0.1107 5.78 V Q | | | |
0+25 0.1524 6.06 V Q | | | |
0+30 0.1968 6.45 |V Q | | | |
0+35 0.2456 7.08 |V Q | | | |
0+40 0.2960 7.32 |V Q | | | |
0+45 0.3469 7.40 |V Q | | | |
0+50 0.3982 7.44 | V Q | | | |
0+55 0.4496 7.47 | V Q | | | |
1+ 0 0.5027 7.71 | V Q | | | |
1+ 5 0.5595 8.24 | V Q | | | |
1+10 0.6173 8.40 | V Q | | | |
1+15 0.6757 8.47 | V Q | | | |
1+20 0.7343 8.51 | V Q | | | |
1+25 0.7931 8.54 | V Q | | | |
1+30 0.8521 8.56 | V Q | | | |
1+35 0.9111 8.57 | V Q | | | |
1+40 0.9701 8.57 | VQ | | | |
1+45 1.0291 8.57 | VQ | | | |
1+50 1.0881 8.57 | VQ | | | |
1+55 1.1471 8.57 | Q | | | |
2+ 0 1.2077 8.79 | VQ | | | |
2+ 5 1.2703 9.09 | VQ | | | |
2+10 1.3319 8.95 | Q | | | |
2+15 1.3965 9.38 | Q | | | |
2+20 1.4621 9.51 | Q | | | |
2+25 1.5280 9.57 | QV | | | |
2+30 1.5941 9.60 | QV | | | |

Page 3 ends

F.1.k
Packet Pg. 1862 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR565
2+35 1.6604 9.62 | Q V| | | |
2+40 1.7267 9.63 | Q V| | | |
2+45 1.7946 9.86 | Q V| | | |
2+50 1.8661 10.38 | Q V | | |
2+55 1.9387 10.54 | Q V | | |
3+ 0 2.0118 10.62 | Q V | | |
3+ 5 2.0852 10.66 | Q |V | | |
3+10 2.1603 10.90 | Q |V | | |
3+15 2.2391 11.44 | Q| V | | |
3+20 2.3191 11.61 | Q| V | | |
3+25 2.4011 11.91 | Q| V | | |
3+30 2.4885 12.69 | Q V | | |
3+35 2.5823 13.62 | Q V | | |
3+40 2.6814 14.39 | |Q V | | |
3+45 2.7840 14.90 | |Q V | | |
3+50 2.8912 15.56 | | Q V | | |
3+55 3.0015 16.02 | | Q V | | |
4+ 0 3.1163 16.67 | | Q V | | |
4+ 5 3.2343 17.12 | | Q V | | |
4+10 3.3581 17.98 | | Q V | | |
4+15 3.4885 18.94 | | Q V | | |
4+20 3.6259 19.95 | | Q V| | |
4+25 3.7704 20.98 | | Q V | |
4+30 3.9207 21.82 | | Q |V | |
4+35 4.0746 22.35 | | Q | V | |
4+40 4.2348 23.27 | | Q | V | |
4+45 4.4020 24.26 | | Q| V | |
4+50 4.5746 25.07 | | Q V | |
4+55 4.7509 25.60 | | Q V | |
5+ 0 4.9334 26.49 | | |Q V | |
5+ 5 5.1287 28.36 | | | Q V | |
5+10 5.3515 32.36 | | | Q V| |
5+15 5.6034 36.57 | | | QV |
5+20 5.8792 40.05 | | | |VQ |
5+25 6.1809 43.81 | | | | V Q |
5+30 6.5216 49.46 | | | | V Q|
5+35 6.8477 47.35 | | | | Q |
5+40 7.0406 28.01 | | | Q | V |
5+45 7.1594 17.24 | | Q | | V |
5+50 7.2402 11.73 | Q| | | V|
5+55 7.2980 8.40 | Q | | | V|
6+ 0 7.3366 5.59 | Q | | | V|
6+ 5 7.3599 3.39 | Q | | | V|
6+10 7.3688 1.29 |Q | | | V|
6+15 7.3730 0.61 Q | | | V|
6+20 7.3752 0.32 Q | | | V|
6+25 7.3763 0.16 Q | | | V|
6+30 7.3768 0.07 Q | | | V|
6+35 7.3770 0.03 Q | | | V
-----------------------------------------------------------------------

Page 4 ends

F.1.k
Packet Pg. 1863 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR5245.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 5-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 24 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.75 117.42
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 4.50 301.95
STORM EVENT (YEAR) = 5.00
Area Averaged 2-Year Rainfall = 1.750(In)
Area Averaged 100-Year Rainfall = 4.500(In)
Point rain (area averaged) = 2.394(In)
Areal adjustment factor = 99.99 %
Adjusted average point rain = 2.394(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-1 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 36.0 0.706 0.900 0.134 1.000 0.134
Sum (F) = 0.134

Page 1 ends

F.1.k
Packet Pg. 1864 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
Area averaged mean soil loss (F) (In/Hr) = 0.134
Minimum soil loss rate ((In/Hr)) = 0.067
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 0.07 0.019 ( 0.238) 0.002 0.017
2 0.17 0.07 0.019 ( 0.237) 0.002 0.017
3 0.25 0.07 0.019 ( 0.236) 0.002 0.017
4 0.33 0.10 0.029 ( 0.235) 0.003 0.026
5 0.42 0.10 0.029 ( 0.234) 0.003 0.026
6 0.50 0.10 0.029 ( 0.233) 0.003 0.026
7 0.58 0.10 0.029 ( 0.232) 0.003 0.026
8 0.67 0.10 0.029 ( 0.231) 0.003 0.026
9 0.75 0.10 0.029 ( 0.230) 0.003 0.026
10 0.83 0.13 0.038 ( 0.230) 0.004 0.034
11 0.92 0.13 0.038 ( 0.229) 0.004 0.034
12 1.00 0.13 0.038 ( 0.228) 0.004 0.034
13 1.08 0.10 0.029 ( 0.227) 0.003 0.026
14 1.17 0.10 0.029 ( 0.226) 0.003 0.026
15 1.25 0.10 0.029 ( 0.225) 0.003 0.026
16 1.33 0.10 0.029 ( 0.224) 0.003 0.026
17 1.42 0.10 0.029 ( 0.223) 0.003 0.026
18 1.50 0.10 0.029 ( 0.222) 0.003 0.026
19 1.58 0.10 0.029 ( 0.222) 0.003 0.026
20 1.67 0.10 0.029 ( 0.221) 0.003 0.026
21 1.75 0.10 0.029 ( 0.220) 0.003 0.026
22 1.83 0.13 0.038 ( 0.219) 0.004 0.034
23 1.92 0.13 0.038 ( 0.218) 0.004 0.034
24 2.00 0.13 0.038 ( 0.217) 0.004 0.034
25 2.08 0.13 0.038 ( 0.216) 0.004 0.034
26 2.17 0.13 0.038 ( 0.215) 0.004 0.034
27 2.25 0.13 0.038 ( 0.214) 0.004 0.034
28 2.33 0.13 0.038 ( 0.214) 0.004 0.034
29 2.42 0.13 0.038 ( 0.213) 0.004 0.034
30 2.50 0.13 0.038 ( 0.212) 0.004 0.034
31 2.58 0.17 0.048 ( 0.211) 0.005 0.043
32 2.67 0.17 0.048 ( 0.210) 0.005 0.043
33 2.75 0.17 0.048 ( 0.209) 0.005 0.043
34 2.83 0.17 0.048 ( 0.208) 0.005 0.043
35 2.92 0.17 0.048 ( 0.208) 0.005 0.043
36 3.00 0.17 0.048 ( 0.207) 0.005 0.043
37 3.08 0.17 0.048 ( 0.206) 0.005 0.043
38 3.17 0.17 0.048 ( 0.205) 0.005 0.043
39 3.25 0.17 0.048 ( 0.204) 0.005 0.043
40 3.33 0.17 0.048 ( 0.203) 0.005 0.043
41 3.42 0.17 0.048 ( 0.202) 0.005 0.043
42 3.50 0.17 0.048 ( 0.202) 0.005 0.043
43 3.58 0.17 0.048 ( 0.201) 0.005 0.043
44 3.67 0.17 0.048 ( 0.200) 0.005 0.043
45 3.75 0.17 0.048 ( 0.199) 0.005 0.043
46 3.83 0.20 0.057 ( 0.198) 0.006 0.052

Page 2 ends

F.1.k
Packet Pg. 1865 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
47 3.92 0.20 0.057 ( 0.197) 0.006 0.052
48 4.00 0.20 0.057 ( 0.197) 0.006 0.052
49 4.08 0.20 0.057 ( 0.196) 0.006 0.052
50 4.17 0.20 0.057 ( 0.195) 0.006 0.052
51 4.25 0.20 0.057 ( 0.194) 0.006 0.052
52 4.33 0.23 0.067 ( 0.193) 0.007 0.060
53 4.42 0.23 0.067 ( 0.192) 0.007 0.060
54 4.50 0.23 0.067 ( 0.192) 0.007 0.060
55 4.58 0.23 0.067 ( 0.191) 0.007 0.060
56 4.67 0.23 0.067 ( 0.190) 0.007 0.060
57 4.75 0.23 0.067 ( 0.189) 0.007 0.060
58 4.83 0.27 0.077 ( 0.188) 0.008 0.069
59 4.92 0.27 0.077 ( 0.187) 0.008 0.069
60 5.00 0.27 0.077 ( 0.187) 0.008 0.069
61 5.08 0.20 0.057 ( 0.186) 0.006 0.052
62 5.17 0.20 0.057 ( 0.185) 0.006 0.052
63 5.25 0.20 0.057 ( 0.184) 0.006 0.052
64 5.33 0.23 0.067 ( 0.183) 0.007 0.060
65 5.42 0.23 0.067 ( 0.183) 0.007 0.060
66 5.50 0.23 0.067 ( 0.182) 0.007 0.060
67 5.58 0.27 0.077 ( 0.181) 0.008 0.069
68 5.67 0.27 0.077 ( 0.180) 0.008 0.069
69 5.75 0.27 0.077 ( 0.179) 0.008 0.069
70 5.83 0.27 0.077 ( 0.179) 0.008 0.069
71 5.92 0.27 0.077 ( 0.178) 0.008 0.069
72 6.00 0.27 0.077 ( 0.177) 0.008 0.069
73 6.08 0.30 0.086 ( 0.176) 0.009 0.078
74 6.17 0.30 0.086 ( 0.175) 0.009 0.078
75 6.25 0.30 0.086 ( 0.175) 0.009 0.078
76 6.33 0.30 0.086 ( 0.174) 0.009 0.078
77 6.42 0.30 0.086 ( 0.173) 0.009 0.078
78 6.50 0.30 0.086 ( 0.172) 0.009 0.078
79 6.58 0.33 0.096 ( 0.172) 0.010 0.086
80 6.67 0.33 0.096 ( 0.171) 0.010 0.086
81 6.75 0.33 0.096 ( 0.170) 0.010 0.086
82 6.83 0.33 0.096 ( 0.169) 0.010 0.086
83 6.92 0.33 0.096 ( 0.169) 0.010 0.086
84 7.00 0.33 0.096 ( 0.168) 0.010 0.086
85 7.08 0.33 0.096 ( 0.167) 0.010 0.086
86 7.17 0.33 0.096 ( 0.166) 0.010 0.086
87 7.25 0.33 0.096 ( 0.165) 0.010 0.086
88 7.33 0.37 0.105 ( 0.165) 0.011 0.095
89 7.42 0.37 0.105 ( 0.164) 0.011 0.095
90 7.50 0.37 0.105 ( 0.163) 0.011 0.095
91 7.58 0.40 0.115 ( 0.162) 0.011 0.103
92 7.67 0.40 0.115 ( 0.162) 0.011 0.103
93 7.75 0.40 0.115 ( 0.161) 0.011 0.103
94 7.83 0.43 0.124 ( 0.160) 0.012 0.112
95 7.92 0.43 0.124 ( 0.159) 0.012 0.112
96 8.00 0.43 0.124 ( 0.159) 0.012 0.112
97 8.08 0.50 0.144 ( 0.158) 0.014 0.129
98 8.17 0.50 0.144 ( 0.157) 0.014 0.129
99 8.25 0.50 0.144 ( 0.157) 0.014 0.129
100 8.33 0.50 0.144 ( 0.156) 0.014 0.129
101 8.42 0.50 0.144 ( 0.155) 0.014 0.129
102 8.50 0.50 0.144 ( 0.154) 0.014 0.129
103 8.58 0.53 0.153 ( 0.154) 0.015 0.138
104 8.67 0.53 0.153 ( 0.153) 0.015 0.138
105 8.75 0.53 0.153 ( 0.152) 0.015 0.138
106 8.83 0.57 0.163 ( 0.151) 0.016 0.147
107 8.92 0.57 0.163 ( 0.151) 0.016 0.147
108 9.00 0.57 0.163 ( 0.150) 0.016 0.147
109 9.08 0.63 0.182 ( 0.149) 0.018 0.164
110 9.17 0.63 0.182 ( 0.149) 0.018 0.164
111 9.25 0.63 0.182 ( 0.148) 0.018 0.164
112 9.33 0.67 0.192 ( 0.147) 0.019 0.172
113 9.42 0.67 0.192 ( 0.147) 0.019 0.172
114 9.50 0.67 0.192 ( 0.146) 0.019 0.172
115 9.58 0.70 0.201 ( 0.145) 0.020 0.181
116 9.67 0.70 0.201 ( 0.144) 0.020 0.181
117 9.75 0.70 0.201 ( 0.144) 0.020 0.181
118 9.83 0.73 0.211 ( 0.143) 0.021 0.190
119 9.92 0.73 0.211 ( 0.142) 0.021 0.190
120 10.00 0.73 0.211 ( 0.142) 0.021 0.190
121 10.08 0.50 0.144 ( 0.141) 0.014 0.129
122 10.17 0.50 0.144 ( 0.140) 0.014 0.129
123 10.25 0.50 0.144 ( 0.140) 0.014 0.129

Page 3 ends

F.1.k
Packet Pg. 1866 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
124 10.33 0.50 0.144 ( 0.139) 0.014 0.129
125 10.42 0.50 0.144 ( 0.138) 0.014 0.129
126 10.50 0.50 0.144 ( 0.138) 0.014 0.129
127 10.58 0.67 0.192 ( 0.137) 0.019 0.172
128 10.67 0.67 0.192 ( 0.136) 0.019 0.172
129 10.75 0.67 0.192 ( 0.136) 0.019 0.172
130 10.83 0.67 0.192 ( 0.135) 0.019 0.172
131 10.92 0.67 0.192 ( 0.134) 0.019 0.172
132 11.00 0.67 0.192 ( 0.134) 0.019 0.172
133 11.08 0.63 0.182 ( 0.133) 0.018 0.164
134 11.17 0.63 0.182 ( 0.132) 0.018 0.164
135 11.25 0.63 0.182 ( 0.132) 0.018 0.164
136 11.33 0.63 0.182 ( 0.131) 0.018 0.164
137 11.42 0.63 0.182 ( 0.130) 0.018 0.164
138 11.50 0.63 0.182 ( 0.130) 0.018 0.164
139 11.58 0.57 0.163 ( 0.129) 0.016 0.147
140 11.67 0.57 0.163 ( 0.128) 0.016 0.147
141 11.75 0.57 0.163 ( 0.128) 0.016 0.147
142 11.83 0.60 0.172 ( 0.127) 0.017 0.155
143 11.92 0.60 0.172 ( 0.126) 0.017 0.155
144 12.00 0.60 0.172 ( 0.126) 0.017 0.155
145 12.08 0.83 0.239 ( 0.125) 0.024 0.215
146 12.17 0.83 0.239 ( 0.125) 0.024 0.215
147 12.25 0.83 0.239 ( 0.124) 0.024 0.215
148 12.33 0.87 0.249 ( 0.123) 0.025 0.224
149 12.42 0.87 0.249 ( 0.123) 0.025 0.224
150 12.50 0.87 0.249 ( 0.122) 0.025 0.224
151 12.58 0.93 0.268 ( 0.121) 0.027 0.241
152 12.67 0.93 0.268 ( 0.121) 0.027 0.241
153 12.75 0.93 0.268 ( 0.120) 0.027 0.241
154 12.83 0.97 0.278 ( 0.120) 0.028 0.250
155 12.92 0.97 0.278 ( 0.119) 0.028 0.250
156 13.00 0.97 0.278 ( 0.118) 0.028 0.250
157 13.08 1.13 0.326 ( 0.118) 0.033 0.293
158 13.17 1.13 0.326 ( 0.117) 0.033 0.293
159 13.25 1.13 0.326 ( 0.117) 0.033 0.293
160 13.33 1.13 0.326 ( 0.116) 0.033 0.293
161 13.42 1.13 0.326 ( 0.115) 0.033 0.293
162 13.50 1.13 0.326 ( 0.115) 0.033 0.293
163 13.58 0.77 0.220 ( 0.114) 0.022 0.198
164 13.67 0.77 0.220 ( 0.114) 0.022 0.198
165 13.75 0.77 0.220 ( 0.113) 0.022 0.198
166 13.83 0.77 0.220 ( 0.113) 0.022 0.198
167 13.92 0.77 0.220 ( 0.112) 0.022 0.198
168 14.00 0.77 0.220 ( 0.111) 0.022 0.198
169 14.08 0.90 0.259 ( 0.111) 0.026 0.233
170 14.17 0.90 0.259 ( 0.110) 0.026 0.233
171 14.25 0.90 0.259 ( 0.110) 0.026 0.233
172 14.33 0.87 0.249 ( 0.109) 0.025 0.224
173 14.42 0.87 0.249 ( 0.109) 0.025 0.224
174 14.50 0.87 0.249 ( 0.108) 0.025 0.224
175 14.58 0.87 0.249 ( 0.107) 0.025 0.224
176 14.67 0.87 0.249 ( 0.107) 0.025 0.224
177 14.75 0.87 0.249 ( 0.106) 0.025 0.224
178 14.83 0.83 0.239 ( 0.106) 0.024 0.215
179 14.92 0.83 0.239 ( 0.105) 0.024 0.215
180 15.00 0.83 0.239 ( 0.105) 0.024 0.215
181 15.08 0.80 0.230 ( 0.104) 0.023 0.207
182 15.17 0.80 0.230 ( 0.104) 0.023 0.207
183 15.25 0.80 0.230 ( 0.103) 0.023 0.207
184 15.33 0.77 0.220 ( 0.103) 0.022 0.198
185 15.42 0.77 0.220 ( 0.102) 0.022 0.198
186 15.50 0.77 0.220 ( 0.102) 0.022 0.198
187 15.58 0.63 0.182 ( 0.101) 0.018 0.164
188 15.67 0.63 0.182 ( 0.101) 0.018 0.164
189 15.75 0.63 0.182 ( 0.100) 0.018 0.164
190 15.83 0.63 0.182 ( 0.100) 0.018 0.164
191 15.92 0.63 0.182 ( 0.099) 0.018 0.164
192 16.00 0.63 0.182 ( 0.099) 0.018 0.164
193 16.08 0.13 0.038 ( 0.098) 0.004 0.034
194 16.17 0.13 0.038 ( 0.098) 0.004 0.034
195 16.25 0.13 0.038 ( 0.097) 0.004 0.034
196 16.33 0.13 0.038 ( 0.097) 0.004 0.034
197 16.42 0.13 0.038 ( 0.096) 0.004 0.034
198 16.50 0.13 0.038 ( 0.096) 0.004 0.034
199 16.58 0.10 0.029 ( 0.095) 0.003 0.026
200 16.67 0.10 0.029 ( 0.095) 0.003 0.026

Page 4 ends

F.1.k
Packet Pg. 1867 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
201 16.75 0.10 0.029 ( 0.094) 0.003 0.026
202 16.83 0.10 0.029 ( 0.094) 0.003 0.026
203 16.92 0.10 0.029 ( 0.093) 0.003 0.026
204 17.00 0.10 0.029 ( 0.093) 0.003 0.026
205 17.08 0.17 0.048 ( 0.092) 0.005 0.043
206 17.17 0.17 0.048 ( 0.092) 0.005 0.043
207 17.25 0.17 0.048 ( 0.091) 0.005 0.043
208 17.33 0.17 0.048 ( 0.091) 0.005 0.043
209 17.42 0.17 0.048 ( 0.090) 0.005 0.043
210 17.50 0.17 0.048 ( 0.090) 0.005 0.043
211 17.58 0.17 0.048 ( 0.089) 0.005 0.043
212 17.67 0.17 0.048 ( 0.089) 0.005 0.043
213 17.75 0.17 0.048 ( 0.089) 0.005 0.043
214 17.83 0.13 0.038 ( 0.088) 0.004 0.034
215 17.92 0.13 0.038 ( 0.088) 0.004 0.034
216 18.00 0.13 0.038 ( 0.087) 0.004 0.034
217 18.08 0.13 0.038 ( 0.087) 0.004 0.034
218 18.17 0.13 0.038 ( 0.086) 0.004 0.034
219 18.25 0.13 0.038 ( 0.086) 0.004 0.034
220 18.33 0.13 0.038 ( 0.086) 0.004 0.034
221 18.42 0.13 0.038 ( 0.085) 0.004 0.034
222 18.50 0.13 0.038 ( 0.085) 0.004 0.034
223 18.58 0.10 0.029 ( 0.084) 0.003 0.026
224 18.67 0.10 0.029 ( 0.084) 0.003 0.026
225 18.75 0.10 0.029 ( 0.084) 0.003 0.026
226 18.83 0.07 0.019 ( 0.083) 0.002 0.017
227 18.92 0.07 0.019 ( 0.083) 0.002 0.017
228 19.00 0.07 0.019 ( 0.082) 0.002 0.017
229 19.08 0.10 0.029 ( 0.082) 0.003 0.026
230 19.17 0.10 0.029 ( 0.082) 0.003 0.026
231 19.25 0.10 0.029 ( 0.081) 0.003 0.026
232 19.33 0.13 0.038 ( 0.081) 0.004 0.034
233 19.42 0.13 0.038 ( 0.080) 0.004 0.034
234 19.50 0.13 0.038 ( 0.080) 0.004 0.034
235 19.58 0.10 0.029 ( 0.080) 0.003 0.026
236 19.67 0.10 0.029 ( 0.079) 0.003 0.026
237 19.75 0.10 0.029 ( 0.079) 0.003 0.026
238 19.83 0.07 0.019 ( 0.079) 0.002 0.017
239 19.92 0.07 0.019 ( 0.078) 0.002 0.017
240 20.00 0.07 0.019 ( 0.078) 0.002 0.017
241 20.08 0.10 0.029 ( 0.078) 0.003 0.026
242 20.17 0.10 0.029 ( 0.077) 0.003 0.026
243 20.25 0.10 0.029 ( 0.077) 0.003 0.026
244 20.33 0.10 0.029 ( 0.077) 0.003 0.026
245 20.42 0.10 0.029 ( 0.076) 0.003 0.026
246 20.50 0.10 0.029 ( 0.076) 0.003 0.026
247 20.58 0.10 0.029 ( 0.076) 0.003 0.026
248 20.67 0.10 0.029 ( 0.075) 0.003 0.026
249 20.75 0.10 0.029 ( 0.075) 0.003 0.026
250 20.83 0.07 0.019 ( 0.075) 0.002 0.017
251 20.92 0.07 0.019 ( 0.074) 0.002 0.017
252 21.00 0.07 0.019 ( 0.074) 0.002 0.017
253 21.08 0.10 0.029 ( 0.074) 0.003 0.026
254 21.17 0.10 0.029 ( 0.073) 0.003 0.026
255 21.25 0.10 0.029 ( 0.073) 0.003 0.026
256 21.33 0.07 0.019 ( 0.073) 0.002 0.017
257 21.42 0.07 0.019 ( 0.073) 0.002 0.017
258 21.50 0.07 0.019 ( 0.072) 0.002 0.017
259 21.58 0.10 0.029 ( 0.072) 0.003 0.026
260 21.67 0.10 0.029 ( 0.072) 0.003 0.026
261 21.75 0.10 0.029 ( 0.072) 0.003 0.026
262 21.83 0.07 0.019 ( 0.071) 0.002 0.017
263 21.92 0.07 0.019 ( 0.071) 0.002 0.017
264 22.00 0.07 0.019 ( 0.071) 0.002 0.017
265 22.08 0.10 0.029 ( 0.071) 0.003 0.026
266 22.17 0.10 0.029 ( 0.070) 0.003 0.026
267 22.25 0.10 0.029 ( 0.070) 0.003 0.026
268 22.33 0.07 0.019 ( 0.070) 0.002 0.017
269 22.42 0.07 0.019 ( 0.070) 0.002 0.017
270 22.50 0.07 0.019 ( 0.069) 0.002 0.017
271 22.58 0.07 0.019 ( 0.069) 0.002 0.017
272 22.67 0.07 0.019 ( 0.069) 0.002 0.017
273 22.75 0.07 0.019 ( 0.069) 0.002 0.017
274 22.83 0.07 0.019 ( 0.069) 0.002 0.017
275 22.92 0.07 0.019 ( 0.069) 0.002 0.017
276 23.00 0.07 0.019 ( 0.068) 0.002 0.017
277 23.08 0.07 0.019 ( 0.068) 0.002 0.017

Page 5 ends

F.1.k
Packet Pg. 1868 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
278 23.17 0.07 0.019 ( 0.068) 0.002 0.017
279 23.25 0.07 0.019 ( 0.068) 0.002 0.017
280 23.33 0.07 0.019 ( 0.068) 0.002 0.017
281 23.42 0.07 0.019 ( 0.068) 0.002 0.017
282 23.50 0.07 0.019 ( 0.068) 0.002 0.017
283 23.58 0.07 0.019 ( 0.067) 0.002 0.017
284 23.67 0.07 0.019 ( 0.067) 0.002 0.017
285 23.75 0.07 0.019 ( 0.067) 0.002 0.017
286 23.83 0.07 0.019 ( 0.067) 0.002 0.017
287 23.92 0.07 0.019 ( 0.067) 0.002 0.017
288 24.00 0.07 0.019 ( 0.067) 0.002 0.017
(Loss Rate Not Used)
Sum = 100.0 Sum = 25.9
Flood volume = Effective rainfall 2.15(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 12.0(Ac.Ft)
Total soil loss = 0.24(In)
Total soil loss = 1.339(Ac.Ft)
Total rainfall = 2.39(In)
Flood volume = 524759.2 Cubic Feet
Total soil loss = 58306.6 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 19.746(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 24 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 5.0 10.0 15.0 20.0
----------------------------------------------------------------------- 0+ 5 0.0017 0.24 Q | | | |
0+10 0.0072 0.81 VQ | | | |
0+15 0.0140 0.98 VQ | | | |
0+20 0.0221 1.18 V Q | | | |
0+25 0.0325 1.51 V Q | | | |
0+30 0.0437 1.63 V Q | | | |
0+35 0.0553 1.68 V Q | | | |
0+40 0.0672 1.72 V Q | | | |
0+45 0.0791 1.73 V Q | | | |
0+50 0.0919 1.86 V Q | | | |
0+55 0.1068 2.15 V Q | | | |
1+ 0 0.1222 2.24 V Q | | | |
1+ 5 0.1371 2.16 V Q | | | |
1+10 0.1501 1.90 V Q | | | |
1+15 0.1627 1.83 V Q | | | |
1+20 0.1751 1.79 V Q | | | |
1+25 0.1873 1.78 V Q | | | |
1+30 0.1995 1.76 V Q | | | |
1+35 0.2116 1.76 V Q | | | |
1+40 0.2236 1.75 V Q | | | |
1+45 0.2357 1.75 V Q | | | |
1+50 0.2485 1.87 V Q | | | |
1+55 0.2634 2.15 V Q | | | |
2+ 0 0.2788 2.24 V Q | | | |
2+ 5 0.2945 2.28 V Q | | | |
2+10 0.3104 2.30 |V Q | | | |
2+15 0.3263 2.32 |V Q | | | |
2+20 0.3423 2.33 |V Q | | | |
2+25 0.3584 2.33 |V Q | | | |
2+30 0.3745 2.33 |V Q | | | |
2+35 0.3913 2.45 |V Q | | | |
2+40 0.4102 2.74 |V Q | | | |
2+45 0.4296 2.82 |V Q | | | |
2+50 0.4494 2.86 |V Q | | | |
2+55 0.4692 2.89 |V Q | | | |
3+ 0 0.4892 2.90 |V Q | | | |
3+ 5 0.5092 2.91 |V Q | | | |
3+10 0.5293 2.92 |V Q | | | |
3+15 0.5494 2.92 |V Q | | | |
3+20 0.5695 2.92 |V Q | | | |
3+25 0.5895 2.92 |V Q | | | |
3+30 0.6096 2.92 | V Q | | | |
3+35 0.6297 2.92 | V Q | | | |
3+40 0.6498 2.92 | V Q | | | |
3+45 0.6699 2.92 | V Q | | | |

Page 6 ends

F.1.k
Packet Pg. 1869 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
3+50 0.6908 3.04 | V Q | | | |
3+55 0.7136 3.32 | V Q | | | |
4+ 0 0.7371 3.41 | V Q | | | |
4+ 5 0.7608 3.45 | V Q | | | |
4+10 0.7847 3.47 | V Q | | | |
4+15 0.8087 3.48 | V Q | | | |
4+20 0.8336 3.61 | V Q | | | |
4+25 0.8604 3.90 | V Q | | | |
4+30 0.8879 3.99 | V Q | | | |
4+35 0.9157 4.03 | V Q | | | |
4+40 0.9436 4.05 | V Q | | | |
4+45 0.9716 4.07 | V Q | | | |
4+50 1.0005 4.19 | V Q | | | |
4+55 1.0314 4.49 | V Q | | | |
5+ 0 1.0629 4.57 | V Q| | | |
5+ 5 1.0930 4.37 | V Q | | | |
5+10 1.1193 3.83 | V Q | | | |
5+15 1.1446 3.67 | V Q | | | |
5+20 1.1702 3.72 | V Q | | | |
5+25 1.1974 3.96 | V Q | | | |
5+30 1.2251 4.02 | V Q | | | |
5+35 1.2538 4.16 | V Q | | | |
5+40 1.2845 4.46 | V Q | | | |
5+45 1.3159 4.56 | V Q| | | |
5+50 1.3476 4.61 | V Q| | | |
5+55 1.3795 4.63 | V Q| | | |
6+ 0 1.4115 4.65 | V Q| | | |
6+ 5 1.4444 4.78 | V Q| | | |
6+10 1.4794 5.07 | V Q | | |
6+15 1.5149 5.16 | V Q | | |
6+20 1.5506 5.20 | V Q | | |
6+25 1.5866 5.22 | V Q | | |
6+30 1.6226 5.23 | V Q | | |
6+35 1.6595 5.36 | V Q | | |
6+40 1.6985 5.65 | V |Q | | |
6+45 1.7380 5.74 | V |Q | | |
6+50 1.7778 5.78 | V |Q | | |
6+55 1.8177 5.80 | V |Q | | |
7+ 0 1.8578 5.82 | V |Q | | |
7+ 5 1.8979 5.82 | V |Q | | |
7+10 1.9380 5.83 | V |Q | | |
7+15 1.9782 5.83 | V |Q | | |
7+20 2.0192 5.95 | V |Q | | |
7+25 2.0621 6.23 | V | Q | | |
7+30 2.1057 6.32 | V | Q | | |
7+35 2.1503 6.48 | V | Q | | |
7+40 2.1971 6.79 | V | Q | | |
7+45 2.2445 6.89 | V | Q | | |
7+50 2.2931 7.06 | V | Q | | |
7+55 2.3439 7.37 | V | Q | | |
8+ 0 2.3953 7.47 | V | Q | | |
8+ 5 2.4488 7.76 | V | Q | | |
8+10 2.5064 8.36 | V | Q | | |
8+15 2.5652 8.55 | V | Q | | |
8+20 2.6247 8.64 | V | Q | | |
8+25 2.6845 8.69 | V | Q | | |
8+30 2.7445 8.71 | V| Q | | |
8+35 2.8055 8.85 | V| Q | | |
8+40 2.8685 9.15 | V| Q | | |
8+45 2.9321 9.24 | V| Q | | |
8+50 2.9968 9.40 | V| Q | | |
8+55 3.0637 9.70 | V Q| | |
9+ 0 3.1312 9.80 | V Q| | |
9+ 5 3.2007 10.09 | V Q | |
9+10 3.2743 10.69 | V |Q | |
9+15 3.3493 10.88 | |V |Q | |
9+20 3.4256 11.09 | |V | Q | |
9+25 3.5043 11.42 | |V | Q | |
9+30 3.5838 11.54 | |V | Q | |
9+35 3.6644 11.72 | | V | Q | |
9+40 3.7473 12.04 | | V | Q | |
9+45 3.8309 12.14 | | V | Q | |
9+50 3.9157 12.31 | | V | Q | |
9+55 4.0026 12.62 | | V | Q | |
10+ 0 4.0902 12.72 | | V | Q | |
10+ 5 4.1723 11.93 | | V | Q | |
10+10 4.2410 9.97 | | V Q| | |

Page 7 ends

F.1.k
Packet Pg. 1870 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
10+15 4.3055 9.37 | | V Q | | |
10+20 4.3682 9.10 | | V Q | | |
10+25 4.4299 8.95 | | V Q | | |
10+30 4.4909 8.86 | | V Q | | |
10+35 4.5556 9.40 | | V Q | | |
10+40 4.6297 10.77 | | V |Q | |
10+45 4.7069 11.20 | | V | Q | |
10+50 4.7854 11.40 | | V | Q | |
10+55 4.8647 11.51 | | V | Q | |
11+ 0 4.9445 11.58 | | V | Q | |
11+ 5 5.0237 11.51 | | V | Q | |
11+10 5.1012 11.26 | | V | Q | |
11+15 5.1782 11.17 | | V | Q | |
11+20 5.2548 11.13 | | V | Q | |
11+25 5.3313 11.11 | | V | Q | |
11+30 5.4077 11.09 | | V | Q | |
11+35 5.4824 10.84 | | V |Q | |
11+40 5.5532 10.27 | | V Q | |
11+45 5.6227 10.10 | | V Q | |
11+50 5.6925 10.14 | | V Q | |
11+55 5.7640 10.38 | | VQ | |
12+ 0 5.8358 10.43 | | VQ | |
12+ 5 5.9136 11.30 | | V| Q | |
12+10 6.0052 13.29 | | V| Q | |
12+15 6.1010 13.92 | | V Q | |
12+20 6.1997 14.33 | | V Q | |
12+25 6.3014 14.77 | | V Q| |
12+30 6.4045 14.96 | | |V Q| |
12+35 6.5098 15.30 | | |V Q |
12+40 6.6196 15.94 | | |V |Q |
12+45 6.7307 16.13 | | | V | Q |
12+50 6.8432 16.34 | | | V | Q |
12+55 6.9580 16.67 | | | V | Q |
13+ 0 7.0736 16.79 | | | V | Q |
13+ 5 7.1937 17.44 | | | V | Q |
13+10 7.3239 18.90 | | | V | Q |
13+15 7.4571 19.35 | | | V | Q |
13+20 7.5918 19.56 | | | V | Q|
13+25 7.7273 19.68 | | | V | Q|
13+30 7.8633 19.75 | | | V | Q|
13+35 7.9905 18.47 | | | V | Q |
13+40 8.0964 15.38 | | | V Q |
13+45 8.1957 14.42 | | | VQ | |
13+50 8.2920 13.98 | | | Q | |
13+55 8.3867 13.74 | | | Q | |
14+ 0 8.4802 13.58 | | | QV | |
14+ 5 8.5764 13.97 | | | QV | |
14+10 8.6799 15.03 | | | V Q |
14+15 8.7858 15.38 | | | VQ |
14+20 8.8919 15.41 | | | VQ |
14+25 8.9968 15.22 | | | VQ |
14+30 9.1014 15.19 | | | Q |
14+35 9.2059 15.18 | | | Q |
14+40 9.3106 15.19 | | | Q |
14+45 9.4151 15.18 | | | QV |
14+50 9.5187 15.05 | | | QV |
14+55 9.6203 14.76 | | | Q|V |
15+ 0 9.7213 14.67 | | | Q| V |
15+ 5 9.8213 14.51 | | | Q| V |
15+10 9.9191 14.20 | | | Q | V |
15+15 10.0162 14.10 | | | Q | V |
15+20 10.1121 13.93 | | | Q | V |
15+25 10.2059 13.62 | | | Q | V |
15+30 10.2990 13.52 | | | Q | V |
15+35 10.3885 12.99 | | | Q | V |
15+40 10.4699 11.82 | | | Q | V |
15+45 10.5489 11.46 | | | Q | V |
15+50 10.6266 11.29 | | | Q | V |
15+55 10.7037 11.20 | | | Q | V |
16+ 0 10.7805 11.14 | | | Q | V |
16+ 5 10.8445 9.30 | | Q | | V |
16+10 10.8791 5.02 | Q | | V |
16+15 10.9046 3.71 | Q | | | V |
16+20 10.9261 3.11 | Q | | | V |
16+25 10.9452 2.78 | Q | | | V |
16+30 10.9629 2.57 | Q | | | V |
16+35 10.9788 2.32 | Q | | | V |

Page 8 ends

F.1.k
Packet Pg. 1871 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
16+40 10.9921 1.93 | Q | | | V |
16+45 11.0048 1.84 | Q | | | V |
16+50 11.0172 1.80 | Q | | | V |
16+55 11.0295 1.78 | Q | | | V |
17+ 0 11.0416 1.76 | Q | | | V |
17+ 5 11.0554 2.00 | Q | | | V |
17+10 11.0730 2.56 | Q | | | V |
17+15 11.0918 2.73 | Q | | | V |
17+20 11.1112 2.81 | Q | | | V |
17+25 11.1308 2.86 | Q | | | V |
17+30 11.1507 2.88 | Q | | | V |
17+35 11.1707 2.90 | Q | | | V |
17+40 11.1907 2.92 | Q | | | V |
17+45 11.2108 2.92 | Q | | | V |
17+50 11.2301 2.80 | Q | | | V |
17+55 11.2474 2.51 | Q | | | V |
18+ 0 11.2641 2.42 | Q | | | V |
18+ 5 11.2805 2.38 | Q | | | V |
18+10 11.2967 2.36 | Q | | | V |
18+15 11.3129 2.35 | Q | | | V |
18+20 11.3290 2.34 | Q | | | V |
18+25 11.3451 2.33 | Q | | | V |
18+30 11.3612 2.33 | Q | | | V |
18+35 11.3764 2.21 | Q | | | V |
18+40 11.3897 1.93 | Q | | | V |
18+45 11.4023 1.84 | Q | | | V |
18+50 11.4139 1.68 | Q | | | V |
18+55 11.4234 1.37 | Q | | | V |
19+ 0 11.4322 1.27 | Q | | | V |
19+ 5 11.4414 1.35 | Q | | | V |
19+10 11.4524 1.60 | Q | | | V |
19+15 11.4640 1.67 | Q | | | V |
19+20 11.4765 1.82 | Q | | | V |
19+25 11.4912 2.12 | Q | | | V |
19+30 11.5065 2.22 | Q | | | V |
19+35 11.5213 2.15 | Q | | | V |
19+40 11.5344 1.90 | Q | | | V |
19+45 11.5470 1.83 | Q | | | V |
19+50 11.5585 1.67 | Q | | | V |
19+55 11.5680 1.37 | Q | | | V |
20+ 0 11.5767 1.27 | Q | | | V |
20+ 5 11.5860 1.35 | Q | | | V |
20+10 11.5970 1.60 | Q | | | V |
20+15 11.6085 1.67 | Q | | | V |
20+20 11.6203 1.70 | Q | | | V |
20+25 11.6321 1.72 | Q | | | V |
20+30 11.6440 1.73 | Q | | | V |
20+35 11.6560 1.74 | Q | | | V |
20+40 11.6681 1.75 | Q | | | V |
20+45 11.6801 1.75 | Q | | | V |
20+50 11.6914 1.63 | Q | | | V |
20+55 11.7006 1.35 | Q | | | V |
21+ 0 11.7093 1.26 | Q | | | V |
21+ 5 11.7185 1.34 | Q | | | V |
21+10 11.7295 1.60 | Q | | | V |
21+15 11.7410 1.67 | Q | | | V |
21+20 11.7520 1.58 | Q | | | V|
21+25 11.7610 1.32 | Q | | | V|
21+30 11.7696 1.24 | Q | | | V|
21+35 11.7787 1.33 | Q | | | V|
21+40 11.7898 1.60 | Q | | | V|
21+45 11.8013 1.67 | Q | | | V|
21+50 11.8122 1.58 | Q | | | V|
21+55 11.8212 1.32 | Q | | | V|
22+ 0 11.8298 1.24 | Q | | | V|
22+ 5 11.8390 1.33 | Q | | | V|
22+10 11.8500 1.60 | Q | | | V|
22+15 11.8615 1.67 | Q | | | V|
22+20 11.8724 1.58 | Q | | | V|
22+25 11.8815 1.32 | Q | | | V|
22+30 11.8900 1.24 | Q | | | V|
22+35 11.8984 1.21 | Q | | | V|
22+40 11.9066 1.20 | Q | | | V|
22+45 11.9148 1.18 | Q | | | V|
22+50 11.9228 1.17 | Q | | | V|
22+55 11.9309 1.17 | Q | | | V|
23+ 0 11.9389 1.17 | Q | | | V|

Page 9 ends

F.1.k
Packet Pg. 1872 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR5245
23+ 5 11.9469 1.17 | Q | | | V|
23+10 11.9550 1.17 | Q | | | V|
23+15 11.9630 1.17 | Q | | | V|
23+20 11.9710 1.17 | Q | | | V|
23+25 11.9791 1.17 | Q | | | V|
23+30 11.9871 1.17 | Q | | | V|
23+35 11.9951 1.17 | Q | | | V|
23+40 12.0031 1.17 | Q | | | V|
23+45 12.0112 1.17 | Q | | | V|
23+50 12.0192 1.17 | Q | | | V|
23+55 12.0272 1.17 | Q | | | V|
24+ 0 12.0353 1.17 | Q | | | V|
24+ 5 12.0416 0.93 |Q | | | V|
24+10 12.0441 0.36 Q | | | V|
24+15 12.0454 0.18 Q | | | V|
24+20 12.0461 0.10 Q | | | V|
24+25 12.0465 0.06 Q | | | V|
24+30 12.0467 0.03 Q | | | V|
24+35 12.0468 0.01 Q | | | V|
-----------------------------------------------------------------------

Page 10 ends

F.1.k
Packet Pg. 1873 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10110
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR10110.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 10-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 1 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 0.50 33.55
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.20 80.52
STORM EVENT (YEAR) = 10.00
Area Averaged 2-Year Rainfall = 0.500(In)
Area Averaged 100-Year Rainfall = 1.200(In)
Point rain (area averaged) = 0.788(In)
Areal adjustment factor = 99.94 %
Adjusted average point rain = 0.788(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-2 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 56.0 0.511 0.900 0.097 1.000 0.097
Sum (F) = 0.097

Page 1 ends

F.1.k
Packet Pg. 1874 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10110
Area averaged mean soil loss (F) (In/Hr) = 0.097
Minimum soil loss rate ((In/Hr)) = 0.049
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- Slope of intensity-duration curve for a 1 hour storm =0.5000 ---------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 4.20 0.397 ( 0.097) 0.040 0.357
2 0.17 4.30 0.406 ( 0.097) 0.041 0.366
3 0.25 5.00 0.473 ( 0.097) 0.047 0.425
4 0.33 5.00 0.473 ( 0.097) 0.047 0.425
5 0.42 5.80 0.548 ( 0.097) 0.055 0.493
6 0.50 6.50 0.614 ( 0.097) 0.061 0.553
7 0.58 7.40 0.699 ( 0.097) 0.070 0.629
8 0.67 8.60 0.813 ( 0.097) 0.081 0.731
9 0.75 12.30 1.162 0.097 ( 0.116) 1.065
10 0.83 29.10 2.750 0.097 ( 0.275) 2.653
11 0.92 6.80 0.643 ( 0.097) 0.064 0.578
12 1.00 5.00 0.473 ( 0.097) 0.047 0.425
(Loss Rate Not Used)
Sum = 100.0 Sum = 8.7
Flood volume = Effective rainfall 0.73(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 4.1(Ac.Ft)
Total soil loss = 0.06(In)
Total soil loss = 0.348(Ac.Ft)
Total rainfall = 0.79(In)
Flood volume = 176635.1 Cubic Feet
Total soil loss = 15180.3 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 112.980(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 50.0 100.0 150.0 200.0
----------------------------------------------------------------------- 0+ 5 0.0343 4.98 Q | | | |
0+10 0.1505 16.87 |V Q | | | |
0+15 0.2992 21.60 | V Q | | | |
0+20 0.4734 25.29 | VQ | | | |
0+25 0.6649 27.80 | QV | | | |
0+30 0.8836 31.76 | Q V | | | |
0+35 1.1315 36.00 | Q |V | | |
0+40 1.4156 41.26 | Q | V | | |
0+45 1.7639 50.57 | Q V | | |
0+50 2.3521 85.41 | | Q | V | |
0+55 3.1302 112.98 | | | Q V |

Page 2 ends

F.1.k
Packet Pg. 1875 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10110
1+ 0 3.5479 60.65 | | Q | | V |
1+ 5 3.8036 37.13 | Q | | | V |
1+10 3.9193 16.80 | Q | | | V |
1+15 3.9845 9.47 |Q | | | V|
1+20 4.0227 5.54 |Q | | | V|
1+25 4.0464 3.44 Q | | | V|
1+30 4.0526 0.89 Q | | | V|
1+35 4.0550 0.35 Q | | | V
-----------------------------------------------------------------------

Page 3 ends

F.1.k
Packet Pg. 1876 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10310
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR10310.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 10-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 3 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 0.80 53.68
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.86 124.81
STORM EVENT (YEAR) = 10.00
Area Averaged 2-Year Rainfall = 0.800(In)
Area Averaged 100-Year Rainfall = 1.860(In)
Point rain (area averaged) = 1.236(In)
Areal adjustment factor = 99.97 %
Adjusted average point rain = 1.236(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-2 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 56.0 0.511 0.900 0.097 1.000 0.097
Sum (F) = 0.097

Page 1 ends

F.1.k
Packet Pg. 1877 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10310
Area averaged mean soil loss (F) (In/Hr) = 0.097
Minimum soil loss rate ((In/Hr)) = 0.049
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 1.30 0.193 ( 0.097) 0.019 0.173
2 0.17 1.30 0.193 ( 0.097) 0.019 0.173
3 0.25 1.10 0.163 ( 0.097) 0.016 0.147
4 0.33 1.50 0.222 ( 0.097) 0.022 0.200
5 0.42 1.50 0.222 ( 0.097) 0.022 0.200
6 0.50 1.80 0.267 ( 0.097) 0.027 0.240
7 0.58 1.50 0.222 ( 0.097) 0.022 0.200
8 0.67 1.80 0.267 ( 0.097) 0.027 0.240
9 0.75 1.80 0.267 ( 0.097) 0.027 0.240
10 0.83 1.50 0.222 ( 0.097) 0.022 0.200
11 0.92 1.60 0.237 ( 0.097) 0.024 0.214
12 1.00 1.80 0.267 ( 0.097) 0.027 0.240
13 1.08 2.20 0.326 ( 0.097) 0.033 0.294
14 1.17 2.20 0.326 ( 0.097) 0.033 0.294
15 1.25 2.20 0.326 ( 0.097) 0.033 0.294
16 1.33 2.00 0.297 ( 0.097) 0.030 0.267
17 1.42 2.60 0.386 ( 0.097) 0.039 0.347
18 1.50 2.70 0.400 ( 0.097) 0.040 0.360
19 1.58 2.40 0.356 ( 0.097) 0.036 0.320
20 1.67 2.70 0.400 ( 0.097) 0.040 0.360
21 1.75 3.30 0.489 ( 0.097) 0.049 0.440
22 1.83 3.10 0.460 ( 0.097) 0.046 0.414
23 1.92 2.90 0.430 ( 0.097) 0.043 0.387
24 2.00 3.00 0.445 ( 0.097) 0.044 0.400
25 2.08 3.10 0.460 ( 0.097) 0.046 0.414
26 2.17 4.20 0.623 ( 0.097) 0.062 0.561
27 2.25 5.00 0.741 ( 0.097) 0.074 0.667
28 2.33 3.50 0.519 ( 0.097) 0.052 0.467
29 2.42 6.80 1.008 0.097 ( 0.101) 0.911
30 2.50 7.30 1.082 0.097 ( 0.108) 0.985
31 2.58 8.20 1.216 0.097 ( 0.122) 1.119
32 2.67 5.90 0.875 ( 0.097) 0.087 0.787
33 2.75 2.00 0.297 ( 0.097) 0.030 0.267
34 2.83 1.80 0.267 ( 0.097) 0.027 0.240
35 2.92 1.80 0.267 ( 0.097) 0.027 0.240
36 3.00 0.60 0.089 ( 0.097) 0.009 0.080
(Loss Rate Not Used)
Sum = 100.0 Sum = 13.4
Flood volume = Effective rainfall 1.12(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 6.2(Ac.Ft)
Total soil loss = 0.12(In)
Total soil loss = 0.673(Ac.Ft)
Total rainfall = 1.24(In)
Flood volume = 271693.6 Cubic Feet
Total soil loss = 29296.8 Cubic Feet
--------------------------------------------------------------------

Page 2 ends

F.1.k
Packet Pg. 1878 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10310
Peak flow rate of this hydrograph = 65.220(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 17.5 35.0 52.5 70.0
----------------------------------------------------------------------- 0+ 5 0.0167 2.42 VQ | | | |
0+10 0.0727 8.13 V Q | | | |
0+15 0.1382 9.52 V Q | | | |
0+20 0.2084 10.19 |V Q | | | |
0+25 0.2919 12.12 |V Q | | | |
0+30 0.3840 13.38 | V Q | | | |
0+35 0.4838 14.49 | V Q | | | |
0+40 0.5828 14.37 | V Q | | | |
0+45 0.6898 15.53 | V Q | | | |
0+50 0.7954 15.33 | V Q | | | |
0+55 0.8944 14.39 | V Q | | | |
1+ 0 0.9969 14.87 | V Q | | | |
1+ 5 1.1105 16.50 | V Q| | | |
1+10 1.2379 18.50 | V Q | | |
1+15 1.3699 19.16 | V Q | | |
1+20 1.5013 19.09 | VQ | | |
1+25 1.6355 19.49 | VQ | | |
1+30 1.7882 22.17 | |VQ | | |
1+35 1.9453 22.81 | | VQ | | |
1+40 2.1004 22.53 | | QV | | |
1+45 2.2711 24.78 | | Q | | |
1+50 2.4599 27.41 | | Q | | |
1+55 2.6467 27.13 | | QV | | |
2+ 0 2.8303 26.65 | | Q V | | |
2+ 5 3.0171 27.13 | | Q V| | |
2+10 3.2216 29.70 | | Q V | |
2+15 3.4710 36.22 | | Q V | |
2+20 3.7363 38.52 | | | QV | |
2+25 4.0110 39.89 | | | Q V | |
2+30 4.3857 54.41 | | | V |Q |
2+35 4.8185 62.83 | | | V Q |
2+40 5.2676 65.22 | | | | V Q |
2+45 5.6104 49.78 | | | Q | V |
2+50 5.8193 30.33 | | Q | | V |
2+55 5.9804 23.39 | | Q | | V |
3+ 0 6.1063 18.28 | Q | | V|
3+ 5 6.1757 10.08 | Q | | | V|
3+10 6.2079 4.67 | Q | | | V|
3+15 6.2237 2.29 |Q | | | V|
3+20 6.2310 1.06 Q | | | V|
3+25 6.2349 0.57 Q | | | V|
3+30 6.2368 0.28 Q | | | V|
3+35 6.2372 0.07 Q | | | V|
-----------------------------------------------------------------------

Page 3 ends

F.1.k
Packet Pg. 1879 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10610
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR10610.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 10-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 6 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.15 77.16
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 2.50 167.75
STORM EVENT (YEAR) = 10.00
Area Averaged 2-Year Rainfall = 1.150(In)
Area Averaged 100-Year Rainfall = 2.500(In)
Point rain (area averaged) = 1.705(In)
Areal adjustment factor = 99.98 %
Adjusted average point rain = 1.705(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-2 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 56.0 0.511 0.900 0.097 1.000 0.097
Sum (F) = 0.097

Page 1 ends

F.1.k
Packet Pg. 1880 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10610
Area averaged mean soil loss (F) (In/Hr) = 0.097
Minimum soil loss rate ((In/Hr)) = 0.049
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 0.50 0.102 ( 0.097) 0.010 0.092
2 0.17 0.60 0.123 ( 0.097) 0.012 0.110
3 0.25 0.60 0.123 ( 0.097) 0.012 0.110
4 0.33 0.60 0.123 ( 0.097) 0.012 0.110
5 0.42 0.60 0.123 ( 0.097) 0.012 0.110
6 0.50 0.70 0.143 ( 0.097) 0.014 0.129
7 0.58 0.70 0.143 ( 0.097) 0.014 0.129
8 0.67 0.70 0.143 ( 0.097) 0.014 0.129
9 0.75 0.70 0.143 ( 0.097) 0.014 0.129
10 0.83 0.70 0.143 ( 0.097) 0.014 0.129
11 0.92 0.70 0.143 ( 0.097) 0.014 0.129
12 1.00 0.80 0.164 ( 0.097) 0.016 0.147
13 1.08 0.80 0.164 ( 0.097) 0.016 0.147
14 1.17 0.80 0.164 ( 0.097) 0.016 0.147
15 1.25 0.80 0.164 ( 0.097) 0.016 0.147
16 1.33 0.80 0.164 ( 0.097) 0.016 0.147
17 1.42 0.80 0.164 ( 0.097) 0.016 0.147
18 1.50 0.80 0.164 ( 0.097) 0.016 0.147
19 1.58 0.80 0.164 ( 0.097) 0.016 0.147
20 1.67 0.80 0.164 ( 0.097) 0.016 0.147
21 1.75 0.80 0.164 ( 0.097) 0.016 0.147
22 1.83 0.80 0.164 ( 0.097) 0.016 0.147
23 1.92 0.80 0.164 ( 0.097) 0.016 0.147
24 2.00 0.90 0.184 ( 0.097) 0.018 0.166
25 2.08 0.80 0.164 ( 0.097) 0.016 0.147
26 2.17 0.90 0.184 ( 0.097) 0.018 0.166
27 2.25 0.90 0.184 ( 0.097) 0.018 0.166
28 2.33 0.90 0.184 ( 0.097) 0.018 0.166
29 2.42 0.90 0.184 ( 0.097) 0.018 0.166
30 2.50 0.90 0.184 ( 0.097) 0.018 0.166
31 2.58 0.90 0.184 ( 0.097) 0.018 0.166
32 2.67 0.90 0.184 ( 0.097) 0.018 0.166
33 2.75 1.00 0.205 ( 0.097) 0.020 0.184
34 2.83 1.00 0.205 ( 0.097) 0.020 0.184
35 2.92 1.00 0.205 ( 0.097) 0.020 0.184
36 3.00 1.00 0.205 ( 0.097) 0.020 0.184
37 3.08 1.00 0.205 ( 0.097) 0.020 0.184
38 3.17 1.10 0.225 ( 0.097) 0.023 0.203
39 3.25 1.10 0.225 ( 0.097) 0.023 0.203
40 3.33 1.10 0.225 ( 0.097) 0.023 0.203
41 3.42 1.20 0.246 ( 0.097) 0.025 0.221
42 3.50 1.30 0.266 ( 0.097) 0.027 0.239
43 3.58 1.40 0.286 ( 0.097) 0.029 0.258
44 3.67 1.40 0.286 ( 0.097) 0.029 0.258
45 3.75 1.50 0.307 ( 0.097) 0.031 0.276
46 3.83 1.50 0.307 ( 0.097) 0.031 0.276

Page 2 ends

F.1.k
Packet Pg. 1881 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10610
47 3.92 1.60 0.327 ( 0.097) 0.033 0.295
48 4.00 1.60 0.327 ( 0.097) 0.033 0.295
49 4.08 1.70 0.348 ( 0.097) 0.035 0.313
50 4.17 1.80 0.368 ( 0.097) 0.037 0.331
51 4.25 1.90 0.389 ( 0.097) 0.039 0.350
52 4.33 2.00 0.409 ( 0.097) 0.041 0.368
53 4.42 2.10 0.430 ( 0.097) 0.043 0.387
54 4.50 2.10 0.430 ( 0.097) 0.043 0.387
55 4.58 2.20 0.450 ( 0.097) 0.045 0.405
56 4.67 2.30 0.471 ( 0.097) 0.047 0.424
57 4.75 2.40 0.491 ( 0.097) 0.049 0.442
58 4.83 2.40 0.491 ( 0.097) 0.049 0.442
59 4.92 2.50 0.512 ( 0.097) 0.051 0.460
60 5.00 2.60 0.532 ( 0.097) 0.053 0.479
61 5.08 3.10 0.634 ( 0.097) 0.063 0.571
62 5.17 3.60 0.737 ( 0.097) 0.074 0.663
63 5.25 3.90 0.798 ( 0.097) 0.080 0.718
64 5.33 4.20 0.859 ( 0.097) 0.086 0.773
65 5.42 4.70 0.962 ( 0.097) 0.096 0.865
66 5.50 5.60 1.146 0.097 ( 0.115) 1.049
67 5.58 1.90 0.389 ( 0.097) 0.039 0.350
68 5.67 0.90 0.184 ( 0.097) 0.018 0.166
69 5.75 0.60 0.123 ( 0.097) 0.012 0.110
70 5.83 0.50 0.102 ( 0.097) 0.010 0.092
71 5.92 0.30 0.061 ( 0.097) 0.006 0.055
72 6.00 0.20 0.041 ( 0.097) 0.004 0.037
(Loss Rate Not Used)
Sum = 100.0 Sum = 18.4
Flood volume = Effective rainfall 1.54(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 8.6(Ac.Ft)
Total soil loss = 0.17(In)
Total soil loss = 0.945(Ac.Ft)
Total rainfall = 1.71(In)
Flood volume = 374120.1 Cubic Feet
Total soil loss = 41173.7 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 57.779(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 15.0 30.0 45.0 60.0
----------------------------------------------------------------------- 0+ 5 0.0088 1.28 Q | | | |
0+10 0.0403 4.57 V Q | | | |
0+15 0.0824 6.11 V Q | | | |
0+20 0.1287 6.72 V Q | | | |
0+25 0.1773 7.05 V Q | | | |
0+30 0.2289 7.50 |V Q | | | |
0+35 0.2856 8.23 |V Q | | | |
0+40 0.3442 8.51 |V Q | | | |
0+45 0.4035 8.61 |V Q | | | |
0+50 0.4632 8.66 | V Q | | | |
0+55 0.5230 8.69 | V Q | | | |
1+ 0 0.5847 8.96 | V Q | | | |
1+ 5 0.6507 9.58 | V Q | | | |
1+10 0.7180 9.77 | V Q | | | |
1+15 0.7859 9.86 | V Q | | | |
1+20 0.8541 9.90 | V Q | | | |
1+25 0.9225 9.93 | V Q | | | |
1+30 0.9911 9.95 | V Q | | | |
1+35 1.0597 9.97 | V Q | | | |
1+40 1.1283 9.97 | VQ | | | |
1+45 1.1970 9.97 | VQ | | | |
1+50 1.2656 9.97 | VQ | | | |
1+55 1.3343 9.97 | Q | | | |
2+ 0 1.4047 10.22 | Q | | | |
2+ 5 1.4775 10.57 | VQ | | | |
2+10 1.5492 10.41 | QV | | | |
2+15 1.6244 10.92 | Q | | | |
2+20 1.7006 11.06 | Q | | | |
2+25 1.7773 11.13 | QV | | | |
2+30 1.8542 11.17 | QV | | | |

Page 3 ends

F.1.k
Packet Pg. 1882 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10610
2+35 1.9313 11.19 | QV | | | |
2+40 2.0084 11.20 | Q V| | | |
2+45 2.0874 11.47 | Q V| | | |
2+50 2.1705 12.08 | Q V | | |
2+55 2.2550 12.26 | Q V | | |
3+ 0 2.3400 12.35 | Q V | | |
3+ 5 2.4254 12.40 | Q |V | | |
3+10 2.5127 12.68 | Q |V | | |
3+15 2.6044 13.31 | Q | V | | |
3+20 2.6974 13.51 | Q| V | | |
3+25 2.7928 13.85 | Q| V | | |
3+30 2.8945 14.76 | Q| V | | |
3+35 3.0036 15.84 | Q V | | |
3+40 3.1189 16.74 | |Q V | | |
3+45 3.2382 17.33 | |Q V | | |
3+50 3.3628 18.10 | | Q V | | |
3+55 3.4912 18.64 | | Q V | | |
4+ 0 3.6247 19.39 | | Q V | | |
4+ 5 3.7619 19.92 | | Q V | | |
4+10 3.9059 20.91 | | Q V | | |
4+15 4.0576 22.03 | | Q V | | |
4+20 4.2174 23.21 | | Q V| | |
4+25 4.3855 24.41 | | Q V | |
4+30 4.5603 25.38 | | Q |V | |
4+35 4.7394 26.00 | | Q | V | |
4+40 4.9257 27.06 | | Q | V | |
4+45 5.1201 28.22 | | Q | V | |
4+50 5.3209 29.16 | | Q| V | |
4+55 5.5260 29.77 | | Q| V | |
5+ 0 5.7382 30.81 | | Q V | |
5+ 5 5.9654 32.99 | | |Q V | |
5+10 6.2246 37.64 | | | Q V | |
5+15 6.5176 42.54 | | | Q V |
5+20 6.8384 46.58 | | | |Q |
5+25 7.1893 50.95 | | | | Q |
5+30 7.5872 57.78 | | | | V Q |
5+35 7.9705 55.66 | | | | Q |
5+40 8.1961 32.75 | | |Q | V |
5+45 8.3348 20.14 | | Q | | V |
5+50 8.4291 13.69 | Q| | | V|
5+55 8.4966 9.80 | Q | | | V|
6+ 0 8.5415 6.52 | Q | | | V|
6+ 5 8.5688 3.96 | Q | | | V|
6+10 8.5791 1.50 Q | | | V|
6+15 8.5840 0.71 Q | | | V|
6+20 8.5865 0.37 Q | | | V|
6+25 8.5878 0.19 Q | | | V|
6+30 8.5884 0.08 Q | | | V|
6+35 8.5886 0.03 Q | | | V|
-----------------------------------------------------------------------

Page 4 ends

F.1.k
Packet Pg. 1883 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR102410.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 10-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 24 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.75 117.42
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 4.50 301.95
STORM EVENT (YEAR) = 10.00
Area Averaged 2-Year Rainfall = 1.750(In)
Area Averaged 100-Year Rainfall = 4.500(In)
Point rain (area averaged) = 2.881(In)
Areal adjustment factor = 99.99 %
Adjusted average point rain = 2.881(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-2 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 56.0 0.511 0.900 0.097 1.000 0.097
Sum (F) = 0.097

Page 1 ends

F.1.k
Packet Pg. 1884 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
Area averaged mean soil loss (F) (In/Hr) = 0.097
Minimum soil loss rate ((In/Hr)) = 0.049
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 0.07 0.023 ( 0.172) 0.002 0.021
2 0.17 0.07 0.023 ( 0.171) 0.002 0.021
3 0.25 0.07 0.023 ( 0.171) 0.002 0.021
4 0.33 0.10 0.035 ( 0.170) 0.003 0.031
5 0.42 0.10 0.035 ( 0.169) 0.003 0.031
6 0.50 0.10 0.035 ( 0.169) 0.003 0.031
7 0.58 0.10 0.035 ( 0.168) 0.003 0.031
8 0.67 0.10 0.035 ( 0.167) 0.003 0.031
9 0.75 0.10 0.035 ( 0.167) 0.003 0.031
10 0.83 0.13 0.046 ( 0.166) 0.005 0.041
11 0.92 0.13 0.046 ( 0.165) 0.005 0.041
12 1.00 0.13 0.046 ( 0.165) 0.005 0.041
13 1.08 0.10 0.035 ( 0.164) 0.003 0.031
14 1.17 0.10 0.035 ( 0.163) 0.003 0.031
15 1.25 0.10 0.035 ( 0.163) 0.003 0.031
16 1.33 0.10 0.035 ( 0.162) 0.003 0.031
17 1.42 0.10 0.035 ( 0.162) 0.003 0.031
18 1.50 0.10 0.035 ( 0.161) 0.003 0.031
19 1.58 0.10 0.035 ( 0.160) 0.003 0.031
20 1.67 0.10 0.035 ( 0.160) 0.003 0.031
21 1.75 0.10 0.035 ( 0.159) 0.003 0.031
22 1.83 0.13 0.046 ( 0.158) 0.005 0.041
23 1.92 0.13 0.046 ( 0.158) 0.005 0.041
24 2.00 0.13 0.046 ( 0.157) 0.005 0.041
25 2.08 0.13 0.046 ( 0.156) 0.005 0.041
26 2.17 0.13 0.046 ( 0.156) 0.005 0.041
27 2.25 0.13 0.046 ( 0.155) 0.005 0.041
28 2.33 0.13 0.046 ( 0.155) 0.005 0.041
29 2.42 0.13 0.046 ( 0.154) 0.005 0.041
30 2.50 0.13 0.046 ( 0.153) 0.005 0.041
31 2.58 0.17 0.058 ( 0.153) 0.006 0.052
32 2.67 0.17 0.058 ( 0.152) 0.006 0.052
33 2.75 0.17 0.058 ( 0.151) 0.006 0.052
34 2.83 0.17 0.058 ( 0.151) 0.006 0.052
35 2.92 0.17 0.058 ( 0.150) 0.006 0.052
36 3.00 0.17 0.058 ( 0.150) 0.006 0.052
37 3.08 0.17 0.058 ( 0.149) 0.006 0.052
38 3.17 0.17 0.058 ( 0.148) 0.006 0.052
39 3.25 0.17 0.058 ( 0.148) 0.006 0.052
40 3.33 0.17 0.058 ( 0.147) 0.006 0.052
41 3.42 0.17 0.058 ( 0.146) 0.006 0.052
42 3.50 0.17 0.058 ( 0.146) 0.006 0.052
43 3.58 0.17 0.058 ( 0.145) 0.006 0.052
44 3.67 0.17 0.058 ( 0.145) 0.006 0.052
45 3.75 0.17 0.058 ( 0.144) 0.006 0.052
46 3.83 0.20 0.069 ( 0.143) 0.007 0.062

Page 2 ends

F.1.k
Packet Pg. 1885 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
47 3.92 0.20 0.069 ( 0.143) 0.007 0.062
48 4.00 0.20 0.069 ( 0.142) 0.007 0.062
49 4.08 0.20 0.069 ( 0.142) 0.007 0.062
50 4.17 0.20 0.069 ( 0.141) 0.007 0.062
51 4.25 0.20 0.069 ( 0.140) 0.007 0.062
52 4.33 0.23 0.081 ( 0.140) 0.008 0.073
53 4.42 0.23 0.081 ( 0.139) 0.008 0.073
54 4.50 0.23 0.081 ( 0.139) 0.008 0.073
55 4.58 0.23 0.081 ( 0.138) 0.008 0.073
56 4.67 0.23 0.081 ( 0.137) 0.008 0.073
57 4.75 0.23 0.081 ( 0.137) 0.008 0.073
58 4.83 0.27 0.092 ( 0.136) 0.009 0.083
59 4.92 0.27 0.092 ( 0.136) 0.009 0.083
60 5.00 0.27 0.092 ( 0.135) 0.009 0.083
61 5.08 0.20 0.069 ( 0.134) 0.007 0.062
62 5.17 0.20 0.069 ( 0.134) 0.007 0.062
63 5.25 0.20 0.069 ( 0.133) 0.007 0.062
64 5.33 0.23 0.081 ( 0.133) 0.008 0.073
65 5.42 0.23 0.081 ( 0.132) 0.008 0.073
66 5.50 0.23 0.081 ( 0.132) 0.008 0.073
67 5.58 0.27 0.092 ( 0.131) 0.009 0.083
68 5.67 0.27 0.092 ( 0.130) 0.009 0.083
69 5.75 0.27 0.092 ( 0.130) 0.009 0.083
70 5.83 0.27 0.092 ( 0.129) 0.009 0.083
71 5.92 0.27 0.092 ( 0.129) 0.009 0.083
72 6.00 0.27 0.092 ( 0.128) 0.009 0.083
73 6.08 0.30 0.104 ( 0.128) 0.010 0.093
74 6.17 0.30 0.104 ( 0.127) 0.010 0.093
75 6.25 0.30 0.104 ( 0.126) 0.010 0.093
76 6.33 0.30 0.104 ( 0.126) 0.010 0.093
77 6.42 0.30 0.104 ( 0.125) 0.010 0.093
78 6.50 0.30 0.104 ( 0.125) 0.010 0.093
79 6.58 0.33 0.115 ( 0.124) 0.012 0.104
80 6.67 0.33 0.115 ( 0.124) 0.012 0.104
81 6.75 0.33 0.115 ( 0.123) 0.012 0.104
82 6.83 0.33 0.115 ( 0.122) 0.012 0.104
83 6.92 0.33 0.115 ( 0.122) 0.012 0.104
84 7.00 0.33 0.115 ( 0.121) 0.012 0.104
85 7.08 0.33 0.115 ( 0.121) 0.012 0.104
86 7.17 0.33 0.115 ( 0.120) 0.012 0.104
87 7.25 0.33 0.115 ( 0.120) 0.012 0.104
88 7.33 0.37 0.127 ( 0.119) 0.013 0.114
89 7.42 0.37 0.127 ( 0.119) 0.013 0.114
90 7.50 0.37 0.127 ( 0.118) 0.013 0.114
91 7.58 0.40 0.138 ( 0.118) 0.014 0.124
92 7.67 0.40 0.138 ( 0.117) 0.014 0.124
93 7.75 0.40 0.138 ( 0.116) 0.014 0.124
94 7.83 0.43 0.150 ( 0.116) 0.015 0.135
95 7.92 0.43 0.150 ( 0.115) 0.015 0.135
96 8.00 0.43 0.150 ( 0.115) 0.015 0.135
97 8.08 0.50 0.173 ( 0.114) 0.017 0.156
98 8.17 0.50 0.173 ( 0.114) 0.017 0.156
99 8.25 0.50 0.173 ( 0.113) 0.017 0.156
100 8.33 0.50 0.173 ( 0.113) 0.017 0.156
101 8.42 0.50 0.173 ( 0.112) 0.017 0.156
102 8.50 0.50 0.173 ( 0.112) 0.017 0.156
103 8.58 0.53 0.184 ( 0.111) 0.018 0.166
104 8.67 0.53 0.184 ( 0.111) 0.018 0.166
105 8.75 0.53 0.184 ( 0.110) 0.018 0.166
106 8.83 0.57 0.196 ( 0.110) 0.020 0.176
107 8.92 0.57 0.196 ( 0.109) 0.020 0.176
108 9.00 0.57 0.196 ( 0.109) 0.020 0.176
109 9.08 0.63 0.219 ( 0.108) 0.022 0.197
110 9.17 0.63 0.219 ( 0.108) 0.022 0.197
111 9.25 0.63 0.219 ( 0.107) 0.022 0.197
112 9.33 0.67 0.230 ( 0.107) 0.023 0.207
113 9.42 0.67 0.230 ( 0.106) 0.023 0.207
114 9.50 0.67 0.230 ( 0.105) 0.023 0.207
115 9.58 0.70 0.242 ( 0.105) 0.024 0.218
116 9.67 0.70 0.242 ( 0.104) 0.024 0.218
117 9.75 0.70 0.242 ( 0.104) 0.024 0.218
118 9.83 0.73 0.254 ( 0.103) 0.025 0.228
119 9.92 0.73 0.254 ( 0.103) 0.025 0.228
120 10.00 0.73 0.254 ( 0.102) 0.025 0.228
121 10.08 0.50 0.173 ( 0.102) 0.017 0.156
122 10.17 0.50 0.173 ( 0.101) 0.017 0.156
123 10.25 0.50 0.173 ( 0.101) 0.017 0.156

Page 3 ends

F.1.k
Packet Pg. 1886 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
124 10.33 0.50 0.173 ( 0.101) 0.017 0.156
125 10.42 0.50 0.173 ( 0.100) 0.017 0.156
126 10.50 0.50 0.173 ( 0.100) 0.017 0.156
127 10.58 0.67 0.230 ( 0.099) 0.023 0.207
128 10.67 0.67 0.230 ( 0.099) 0.023 0.207
129 10.75 0.67 0.230 ( 0.098) 0.023 0.207
130 10.83 0.67 0.230 ( 0.098) 0.023 0.207
131 10.92 0.67 0.230 ( 0.097) 0.023 0.207
132 11.00 0.67 0.230 ( 0.097) 0.023 0.207
133 11.08 0.63 0.219 ( 0.096) 0.022 0.197
134 11.17 0.63 0.219 ( 0.096) 0.022 0.197
135 11.25 0.63 0.219 ( 0.095) 0.022 0.197
136 11.33 0.63 0.219 ( 0.095) 0.022 0.197
137 11.42 0.63 0.219 ( 0.094) 0.022 0.197
138 11.50 0.63 0.219 ( 0.094) 0.022 0.197
139 11.58 0.57 0.196 ( 0.093) 0.020 0.176
140 11.67 0.57 0.196 ( 0.093) 0.020 0.176
141 11.75 0.57 0.196 ( 0.092) 0.020 0.176
142 11.83 0.60 0.207 ( 0.092) 0.021 0.187
143 11.92 0.60 0.207 ( 0.092) 0.021 0.187
144 12.00 0.60 0.207 ( 0.091) 0.021 0.187
145 12.08 0.83 0.288 ( 0.091) 0.029 0.259
146 12.17 0.83 0.288 ( 0.090) 0.029 0.259
147 12.25 0.83 0.288 ( 0.090) 0.029 0.259
148 12.33 0.87 0.300 ( 0.089) 0.030 0.270
149 12.42 0.87 0.300 ( 0.089) 0.030 0.270
150 12.50 0.87 0.300 ( 0.088) 0.030 0.270
151 12.58 0.93 0.323 ( 0.088) 0.032 0.290
152 12.67 0.93 0.323 ( 0.087) 0.032 0.290
153 12.75 0.93 0.323 ( 0.087) 0.032 0.290
154 12.83 0.97 0.334 ( 0.087) 0.033 0.301
155 12.92 0.97 0.334 ( 0.086) 0.033 0.301
156 13.00 0.97 0.334 ( 0.086) 0.033 0.301
157 13.08 1.13 0.392 ( 0.085) 0.039 0.353
158 13.17 1.13 0.392 ( 0.085) 0.039 0.353
159 13.25 1.13 0.392 ( 0.084) 0.039 0.353
160 13.33 1.13 0.392 ( 0.084) 0.039 0.353
161 13.42 1.13 0.392 ( 0.084) 0.039 0.353
162 13.50 1.13 0.392 ( 0.083) 0.039 0.353
163 13.58 0.77 0.265 ( 0.083) 0.027 0.239
164 13.67 0.77 0.265 ( 0.082) 0.027 0.239
165 13.75 0.77 0.265 ( 0.082) 0.027 0.239
166 13.83 0.77 0.265 ( 0.081) 0.027 0.239
167 13.92 0.77 0.265 ( 0.081) 0.027 0.239
168 14.00 0.77 0.265 ( 0.081) 0.027 0.239
169 14.08 0.90 0.311 ( 0.080) 0.031 0.280
170 14.17 0.90 0.311 ( 0.080) 0.031 0.280
171 14.25 0.90 0.311 ( 0.079) 0.031 0.280
172 14.33 0.87 0.300 ( 0.079) 0.030 0.270
173 14.42 0.87 0.300 ( 0.079) 0.030 0.270
174 14.50 0.87 0.300 ( 0.078) 0.030 0.270
175 14.58 0.87 0.300 ( 0.078) 0.030 0.270
176 14.67 0.87 0.300 ( 0.077) 0.030 0.270
177 14.75 0.87 0.300 ( 0.077) 0.030 0.270
178 14.83 0.83 0.288 ( 0.077) 0.029 0.259
179 14.92 0.83 0.288 ( 0.076) 0.029 0.259
180 15.00 0.83 0.288 ( 0.076) 0.029 0.259
181 15.08 0.80 0.277 ( 0.075) 0.028 0.249
182 15.17 0.80 0.277 ( 0.075) 0.028 0.249
183 15.25 0.80 0.277 ( 0.075) 0.028 0.249
184 15.33 0.77 0.265 ( 0.074) 0.027 0.239
185 15.42 0.77 0.265 ( 0.074) 0.027 0.239
186 15.50 0.77 0.265 ( 0.073) 0.027 0.239
187 15.58 0.63 0.219 ( 0.073) 0.022 0.197
188 15.67 0.63 0.219 ( 0.073) 0.022 0.197
189 15.75 0.63 0.219 ( 0.072) 0.022 0.197
190 15.83 0.63 0.219 ( 0.072) 0.022 0.197
191 15.92 0.63 0.219 ( 0.072) 0.022 0.197
192 16.00 0.63 0.219 ( 0.071) 0.022 0.197
193 16.08 0.13 0.046 ( 0.071) 0.005 0.041
194 16.17 0.13 0.046 ( 0.071) 0.005 0.041
195 16.25 0.13 0.046 ( 0.070) 0.005 0.041
196 16.33 0.13 0.046 ( 0.070) 0.005 0.041
197 16.42 0.13 0.046 ( 0.069) 0.005 0.041
198 16.50 0.13 0.046 ( 0.069) 0.005 0.041
199 16.58 0.10 0.035 ( 0.069) 0.003 0.031
200 16.67 0.10 0.035 ( 0.068) 0.003 0.031

Page 4 ends

F.1.k
Packet Pg. 1887 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
201 16.75 0.10 0.035 ( 0.068) 0.003 0.031
202 16.83 0.10 0.035 ( 0.068) 0.003 0.031
203 16.92 0.10 0.035 ( 0.067) 0.003 0.031
204 17.00 0.10 0.035 ( 0.067) 0.003 0.031
205 17.08 0.17 0.058 ( 0.067) 0.006 0.052
206 17.17 0.17 0.058 ( 0.066) 0.006 0.052
207 17.25 0.17 0.058 ( 0.066) 0.006 0.052
208 17.33 0.17 0.058 ( 0.066) 0.006 0.052
209 17.42 0.17 0.058 ( 0.065) 0.006 0.052
210 17.50 0.17 0.058 ( 0.065) 0.006 0.052
211 17.58 0.17 0.058 ( 0.065) 0.006 0.052
212 17.67 0.17 0.058 ( 0.064) 0.006 0.052
213 17.75 0.17 0.058 ( 0.064) 0.006 0.052
214 17.83 0.13 0.046 ( 0.064) 0.005 0.041
215 17.92 0.13 0.046 ( 0.063) 0.005 0.041
216 18.00 0.13 0.046 ( 0.063) 0.005 0.041
217 18.08 0.13 0.046 ( 0.063) 0.005 0.041
218 18.17 0.13 0.046 ( 0.063) 0.005 0.041
219 18.25 0.13 0.046 ( 0.062) 0.005 0.041
220 18.33 0.13 0.046 ( 0.062) 0.005 0.041
221 18.42 0.13 0.046 ( 0.062) 0.005 0.041
222 18.50 0.13 0.046 ( 0.061) 0.005 0.041
223 18.58 0.10 0.035 ( 0.061) 0.003 0.031
224 18.67 0.10 0.035 ( 0.061) 0.003 0.031
225 18.75 0.10 0.035 ( 0.060) 0.003 0.031
226 18.83 0.07 0.023 ( 0.060) 0.002 0.021
227 18.92 0.07 0.023 ( 0.060) 0.002 0.021
228 19.00 0.07 0.023 ( 0.060) 0.002 0.021
229 19.08 0.10 0.035 ( 0.059) 0.003 0.031
230 19.17 0.10 0.035 ( 0.059) 0.003 0.031
231 19.25 0.10 0.035 ( 0.059) 0.003 0.031
232 19.33 0.13 0.046 ( 0.058) 0.005 0.041
233 19.42 0.13 0.046 ( 0.058) 0.005 0.041
234 19.50 0.13 0.046 ( 0.058) 0.005 0.041
235 19.58 0.10 0.035 ( 0.058) 0.003 0.031
236 19.67 0.10 0.035 ( 0.057) 0.003 0.031
237 19.75 0.10 0.035 ( 0.057) 0.003 0.031
238 19.83 0.07 0.023 ( 0.057) 0.002 0.021
239 19.92 0.07 0.023 ( 0.057) 0.002 0.021
240 20.00 0.07 0.023 ( 0.056) 0.002 0.021
241 20.08 0.10 0.035 ( 0.056) 0.003 0.031
242 20.17 0.10 0.035 ( 0.056) 0.003 0.031
243 20.25 0.10 0.035 ( 0.056) 0.003 0.031
244 20.33 0.10 0.035 ( 0.055) 0.003 0.031
245 20.42 0.10 0.035 ( 0.055) 0.003 0.031
246 20.50 0.10 0.035 ( 0.055) 0.003 0.031
247 20.58 0.10 0.035 ( 0.055) 0.003 0.031
248 20.67 0.10 0.035 ( 0.054) 0.003 0.031
249 20.75 0.10 0.035 ( 0.054) 0.003 0.031
250 20.83 0.07 0.023 ( 0.054) 0.002 0.021
251 20.92 0.07 0.023 ( 0.054) 0.002 0.021
252 21.00 0.07 0.023 ( 0.054) 0.002 0.021
253 21.08 0.10 0.035 ( 0.053) 0.003 0.031
254 21.17 0.10 0.035 ( 0.053) 0.003 0.031
255 21.25 0.10 0.035 ( 0.053) 0.003 0.031
256 21.33 0.07 0.023 ( 0.053) 0.002 0.021
257 21.42 0.07 0.023 ( 0.053) 0.002 0.021
258 21.50 0.07 0.023 ( 0.052) 0.002 0.021
259 21.58 0.10 0.035 ( 0.052) 0.003 0.031
260 21.67 0.10 0.035 ( 0.052) 0.003 0.031
261 21.75 0.10 0.035 ( 0.052) 0.003 0.031
262 21.83 0.07 0.023 ( 0.052) 0.002 0.021
263 21.92 0.07 0.023 ( 0.051) 0.002 0.021
264 22.00 0.07 0.023 ( 0.051) 0.002 0.021
265 22.08 0.10 0.035 ( 0.051) 0.003 0.031
266 22.17 0.10 0.035 ( 0.051) 0.003 0.031
267 22.25 0.10 0.035 ( 0.051) 0.003 0.031
268 22.33 0.07 0.023 ( 0.051) 0.002 0.021
269 22.42 0.07 0.023 ( 0.050) 0.002 0.021
270 22.50 0.07 0.023 ( 0.050) 0.002 0.021
271 22.58 0.07 0.023 ( 0.050) 0.002 0.021
272 22.67 0.07 0.023 ( 0.050) 0.002 0.021
273 22.75 0.07 0.023 ( 0.050) 0.002 0.021
274 22.83 0.07 0.023 ( 0.050) 0.002 0.021
275 22.92 0.07 0.023 ( 0.050) 0.002 0.021
276 23.00 0.07 0.023 ( 0.049) 0.002 0.021
277 23.08 0.07 0.023 ( 0.049) 0.002 0.021

Page 5 ends

F.1.k
Packet Pg. 1888 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
278 23.17 0.07 0.023 ( 0.049) 0.002 0.021
279 23.25 0.07 0.023 ( 0.049) 0.002 0.021
280 23.33 0.07 0.023 ( 0.049) 0.002 0.021
281 23.42 0.07 0.023 ( 0.049) 0.002 0.021
282 23.50 0.07 0.023 ( 0.049) 0.002 0.021
283 23.58 0.07 0.023 ( 0.049) 0.002 0.021
284 23.67 0.07 0.023 ( 0.049) 0.002 0.021
285 23.75 0.07 0.023 ( 0.049) 0.002 0.021
286 23.83 0.07 0.023 ( 0.049) 0.002 0.021
287 23.92 0.07 0.023 ( 0.049) 0.002 0.021
288 24.00 0.07 0.023 ( 0.049) 0.002 0.021
(Loss Rate Not Used)
Sum = 100.0 Sum = 31.1
Flood volume = Effective rainfall 2.59(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 14.5(Ac.Ft)
Total soil loss = 0.29(In)
Total soil loss = 1.611(Ac.Ft)
Total rainfall = 2.88(In)
Flood volume = 631559.3 Cubic Feet
Total soil loss = 70173.3 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 23.765(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 24 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 7.5 15.0 22.5 30.0
----------------------------------------------------------------------- 0+ 5 0.0020 0.29 Q | | | |
0+10 0.0087 0.97 VQ | | | |
0+15 0.0168 1.18 VQ | | | |
0+20 0.0266 1.42 VQ | | | |
0+25 0.0392 1.82 V Q | | | |
0+30 0.0526 1.96 V Q | | | |
0+35 0.0666 2.03 V Q | | | |
0+40 0.0808 2.07 V Q | | | |
0+45 0.0952 2.09 V Q | | | |
0+50 0.1106 2.24 V Q | | | |
0+55 0.1285 2.59 V Q | | | |
1+ 0 0.1471 2.70 V Q | | | |
1+ 5 0.1650 2.60 V Q | | | |
1+10 0.1807 2.28 V Q | | | |
1+15 0.1958 2.20 V Q | | | |
1+20 0.2107 2.16 V Q | | | |
1+25 0.2255 2.14 V Q | | | |
1+30 0.2401 2.12 V Q | | | |
1+35 0.2546 2.11 V Q | | | |
1+40 0.2691 2.11 V Q | | | |
1+45 0.2836 2.11 V Q | | | |
1+50 0.2991 2.25 V Q | | | |
1+55 0.3170 2.59 V Q | | | |
2+ 0 0.3355 2.70 V Q | | | |
2+ 5 0.3544 2.74 V Q | | | |
2+10 0.3735 2.77 |V Q | | | |
2+15 0.3927 2.79 |V Q | | | |
2+20 0.4120 2.80 |V Q | | | |
2+25 0.4313 2.81 |V Q | | | |
2+30 0.4507 2.81 |V Q | | | |
2+35 0.4710 2.95 |V Q | | | |
2+40 0.4937 3.29 |V Q | | | |
2+45 0.5171 3.40 |V Q | | | |
2+50 0.5408 3.45 |V Q | | | |
2+55 0.5647 3.47 |V Q | | | |
3+ 0 0.5888 3.49 |V Q | | | |
3+ 5 0.6129 3.50 |V Q | | | |
3+10 0.6370 3.51 |V Q | | | |
3+15 0.6612 3.51 |V Q | | | |
3+20 0.6854 3.51 |V Q | | | |
3+25 0.7095 3.51 |V Q | | | |
3+30 0.7337 3.51 | V Q | | | |
3+35 0.7579 3.51 | V Q | | | |
3+40 0.7820 3.51 | V Q | | | |
3+45 0.8062 3.51 | V Q | | | |

Page 6 ends

F.1.k
Packet Pg. 1889 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
3+50 0.8313 3.65 | V Q | | | |
3+55 0.8589 3.99 | V Q | | | |
4+ 0 0.8871 4.10 | V Q | | | |
4+ 5 0.9157 4.15 | V Q | | | |
4+10 0.9444 4.17 | V Q | | | |
4+15 0.9733 4.19 | V Q | | | |
4+20 1.0032 4.35 | V Q | | | |
4+25 1.0356 4.70 | V Q | | | |
4+30 1.0686 4.80 | V Q | | | |
4+35 1.1020 4.85 | V Q | | | |
4+40 1.1356 4.88 | V Q | | | |
4+45 1.1693 4.89 | V Q | | | |
4+50 1.2041 5.05 | V Q | | | |
4+55 1.2413 5.40 | V Q | | | |
5+ 0 1.2792 5.50 | V Q | | | |
5+ 5 1.3154 5.26 | V Q | | | |
5+10 1.3471 4.61 | V Q | | | |
5+15 1.3775 4.41 | V Q | | | |
5+20 1.4083 4.47 | V Q | | | |
5+25 1.4412 4.77 | V Q | | | |
5+30 1.4745 4.84 | V Q | | | |
5+35 1.5090 5.01 | V Q | | | |
5+40 1.5459 5.36 | V Q | | | |
5+45 1.5837 5.48 | V Q | | | |
5+50 1.6219 5.54 | V Q | | | |
5+55 1.6603 5.58 | V Q | | | |
6+ 0 1.6988 5.60 | V Q | | | |
6+ 5 1.7384 5.75 | V Q | | | |
6+10 1.7804 6.10 | V Q | | | |
6+15 1.8232 6.21 | V Q | | | |
6+20 1.8662 6.25 | V Q | | | |
6+25 1.9095 6.28 | V Q | | | |
6+30 1.9529 6.30 | V Q | | | |
6+35 1.9973 6.45 | V Q | | | |
6+40 2.0441 6.80 | V Q| | | |
6+45 2.0917 6.91 | V Q| | | |
6+50 2.1396 6.95 | V Q| | | |
6+55 2.1877 6.98 | V Q| | | |
7+ 0 2.2359 7.00 | V Q| | | |
7+ 5 2.2841 7.01 | V Q| | | |
7+10 2.3325 7.02 | V Q| | | |
7+15 2.3808 7.02 | V Q| | | |
7+20 2.4301 7.16 | V Q| | | |
7+25 2.4818 7.50 | V Q | | |
7+30 2.5342 7.61 | V Q | | |
7+35 2.5879 7.80 | V Q | | |
7+40 2.6442 8.17 | V Q | | |
7+45 2.7013 8.29 | V |Q | | |
7+50 2.7598 8.49 | V |Q | | |
7+55 2.8209 8.87 | V |Q | | |
8+ 0 2.8828 8.99 | V |Q | | |
8+ 5 2.9472 9.34 | V | Q | | |
8+10 3.0164 10.06 | V | Q | | |
8+15 3.0873 10.29 | V | Q | | |
8+20 3.1589 10.39 | V | Q | | |
8+25 3.2309 10.45 | V | Q | | |
8+30 3.3031 10.49 | V| Q | | |
8+35 3.3765 10.65 | V| Q | | |
8+40 3.4523 11.01 | V| Q | | |
8+45 3.5289 11.12 | V| Q | | |
8+50 3.6068 11.31 | V| Q | | |
8+55 3.6872 11.68 | V Q | | |
9+ 0 3.7685 11.80 | V Q | | |
9+ 5 3.8521 12.15 | V Q | | |
9+10 3.9407 12.87 | V Q | | |
9+15 4.0309 13.09 | |V Q | | |
9+20 4.1228 13.34 | |V Q | | |
9+25 4.2175 13.75 | |V Q | | |
9+30 4.3131 13.89 | |V Q | | |
9+35 4.4102 14.10 | | V Q | | |
9+40 4.5100 14.49 | | V Q| | |
9+45 4.6106 14.61 | | V Q| | |
9+50 4.7126 14.81 | | V Q| | |
9+55 4.8172 15.19 | | V Q | |
10+ 0 4.9226 15.31 | | V Q | |
10+ 5 5.0215 14.35 | | V Q| | |
10+10 5.1041 12.00 | | VQ | | |

Page 7 ends

F.1.k
Packet Pg. 1890 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
10+15 5.1818 11.28 | | VQ | | |
10+20 5.2573 10.96 | | Q | | |
10+25 5.3315 10.78 | | Q | | |
10+30 5.4049 10.66 | | Q | | |
10+35 5.4828 11.31 | | Q | | |
10+40 5.5720 12.96 | | V Q | | |
10+45 5.6648 13.48 | | V Q | | |
10+50 5.7594 13.72 | | V Q | | |
10+55 5.8548 13.86 | | V Q | | |
11+ 0 5.9508 13.94 | | V Q | | |
11+ 5 6.0462 13.85 | | V Q | | |
11+10 6.1395 13.55 | | V Q | | |
11+15 6.2320 13.44 | | Q | | |
11+20 6.3243 13.40 | | Q | | |
11+25 6.4164 13.37 | | Q | | |
11+30 6.5083 13.35 | | Q | | |
11+35 6.5982 13.05 | | QV | | |
11+40 6.6833 12.36 | | Q V | | |
11+45 6.7670 12.15 | | Q V | | |
11+50 6.8510 12.20 | | Q V | | |
11+55 6.9370 12.49 | | Q V| | |
12+ 0 7.0235 12.56 | | Q V| | |
12+ 5 7.1172 13.60 | | QV| | |
12+10 7.2274 16.00 | | V|Q | |
12+15 7.3427 16.75 | | V Q | |
12+20 7.4615 17.24 | | V Q | |
12+25 7.5839 17.78 | | V Q | |
12+30 7.7079 18.00 | | |V Q | |
12+35 7.8347 18.41 | | |V Q | |
12+40 7.9668 19.18 | | |V Q | |
12+45 8.1005 19.41 | | | V Q | |
12+50 8.2359 19.66 | | | V Q | |
12+55 8.3741 20.06 | | | V Q | |
13+ 0 8.5132 20.20 | | | V Q | |
13+ 5 8.6578 20.99 | | | V Q | |
13+10 8.8144 22.75 | | | V Q |
13+15 8.9748 23.29 | | | V |Q |
13+20 9.1369 23.54 | | | V |Q |
13+25 9.3000 23.68 | | | V |Q |
13+30 9.4637 23.77 | | | V |Q |
13+35 9.6168 22.23 | | | V Q| |
13+40 9.7442 18.51 | | | Q V | |
13+45 9.8638 17.35 | | | Q V | |
13+50 9.9797 16.83 | | | Q V | |
13+55 10.0935 16.53 | | | Q V | |
14+ 0 10.2061 16.35 | | |Q V | |
14+ 5 10.3219 16.81 | | | Q V | |
14+10 10.4464 18.08 | | | Q V | |
14+15 10.5739 18.51 | | | Q V| |
14+20 10.7017 18.55 | | | Q V| |
14+25 10.8278 18.32 | | | Q V| |
14+30 10.9537 18.28 | | | Q V |
14+35 11.0796 18.27 | | | Q V |
14+40 11.2055 18.28 | | | Q V |
14+45 11.3312 18.26 | | | Q |V |
14+50 11.4560 18.11 | | | Q |V |
14+55 11.5783 17.76 | | | Q |V |
15+ 0 11.6998 17.65 | | | Q | V |
15+ 5 11.8201 17.46 | | | Q | V |
15+10 11.9378 17.09 | | | Q | V |
15+15 12.0547 16.97 | | | Q | V |
15+20 12.1702 16.77 | | | Q | V |
15+25 12.2831 16.39 | | |Q | V |
15+30 12.3951 16.27 | | |Q | V |
15+35 12.5028 15.63 | | Q | V |
15+40 12.6008 14.23 | | Q | | V |
15+45 12.6958 13.79 | | Q | | V |
15+50 12.7894 13.59 | | Q | | V |
15+55 12.8822 13.48 | | Q | | V |
16+ 0 12.9745 13.41 | | Q | | V |
16+ 5 13.0516 11.20 | | Q | | V |
16+10 13.0932 6.04 | Q | | | V |
16+15 13.1240 4.46 | Q | | | V |
16+20 13.1498 3.74 | Q | | | V |
16+25 13.1728 3.34 | Q | | | V |
16+30 13.1941 3.09 | Q | | | V |
16+35 13.2133 2.79 | Q | | | V |

Page 8 ends

F.1.k
Packet Pg. 1891 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
16+40 13.2293 2.32 | Q | | | V |
16+45 13.2445 2.22 | Q | | | V |
16+50 13.2595 2.17 | Q | | | V |
16+55 13.2742 2.14 | Q | | | V |
17+ 0 13.2888 2.12 | Q | | | V |
17+ 5 13.3054 2.40 | Q | | | V |
17+10 13.3266 3.08 | Q | | | V |
17+15 13.3492 3.29 | Q | | | V |
17+20 13.3725 3.38 | Q | | | V |
17+25 13.3962 3.44 | Q | | | V |
17+30 13.4201 3.47 | Q | | | V |
17+35 13.4441 3.49 | Q | | | V |
17+40 13.4683 3.51 | Q | | | V |
17+45 13.4925 3.51 | Q | | | V |
17+50 13.5156 3.36 | Q | | | V |
17+55 13.5365 3.02 | Q | | | V |
18+ 0 13.5565 2.92 | Q | | | V |
18+ 5 13.5763 2.87 | Q | | | V |
18+10 13.5959 2.84 | Q | | | V |
18+15 13.6153 2.83 | Q | | | V |
18+20 13.6347 2.82 | Q | | | V |
18+25 13.6541 2.81 | Q | | | V |
18+30 13.6734 2.81 | Q | | | V |
18+35 13.6917 2.66 | Q | | | V |
18+40 13.7077 2.32 | Q | | | V |
18+45 13.7230 2.22 | Q | | | V |
18+50 13.7369 2.02 | Q | | | V |
18+55 13.7483 1.65 | Q | | | V |
19+ 0 13.7589 1.53 | Q | | | V |
19+ 5 13.7700 1.62 | Q | | | V |
19+10 13.7833 1.93 | Q | | | V |
19+15 13.7971 2.01 | Q | | | V |
19+20 13.8123 2.20 | Q | | | V |
19+25 13.8299 2.56 | Q | | | V |
19+30 13.8483 2.68 | Q | | | V |
19+35 13.8662 2.59 | Q | | | V |
19+40 13.8819 2.28 | Q | | | V |
19+45 13.8970 2.20 | Q | | | V |
19+50 13.9109 2.01 | Q | | | V |
19+55 13.9223 1.65 | Q | | | V |
20+ 0 13.9328 1.53 | Q | | | V |
20+ 5 13.9440 1.62 | Q | | | V |
20+10 13.9573 1.93 | Q | | | V |
20+15 13.9711 2.01 | Q | | | V |
20+20 13.9852 2.05 | Q | | | V |
20+25 13.9995 2.07 | Q | | | V |
20+30 14.0139 2.09 | Q | | | V |
20+35 14.0283 2.10 | Q | | | V |
20+40 14.0428 2.11 | Q | | | V |
20+45 14.0573 2.11 | Q | | | V |
20+50 14.0708 1.96 | Q | | | V |
20+55 14.0820 1.62 | Q | | | V |
21+ 0 14.0924 1.51 | Q | | | V |
21+ 5 14.1035 1.61 | Q | | | V |
21+10 14.1167 1.93 | Q | | | V |
21+15 14.1306 2.01 | Q | | | V |
21+20 14.1437 1.91 | Q | | | V|
21+25 14.1546 1.58 | Q | | | V|
21+30 14.1649 1.50 |Q | | | V|
21+35 14.1760 1.60 | Q | | | V|
21+40 14.1892 1.93 | Q | | | V|
21+45 14.2031 2.01 | Q | | | V|
21+50 14.2162 1.91 | Q | | | V|
21+55 14.2271 1.58 | Q | | | V|
22+ 0 14.2374 1.50 |Q | | | V|
22+ 5 14.2485 1.60 | Q | | | V|
22+10 14.2617 1.93 | Q | | | V|
22+15 14.2756 2.01 | Q | | | V|
22+20 14.2887 1.91 | Q | | | V|
22+25 14.2996 1.58 | Q | | | V|
22+30 14.3099 1.50 |Q | | | V|
22+35 14.3200 1.46 |Q | | | V|
22+40 14.3299 1.44 |Q | | | V|
22+45 14.3397 1.42 |Q | | | V|
22+50 14.3494 1.41 |Q | | | V|
22+55 14.3591 1.40 |Q | | | V|
23+ 0 14.3687 1.40 |Q | | | V|

Page 9 ends

F.1.k
Packet Pg. 1892 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR102410
23+ 5 14.3784 1.40 |Q | | | V|
23+10 14.3881 1.40 |Q | | | V|
23+15 14.3977 1.40 |Q | | | V|
23+20 14.4074 1.40 |Q | | | V|
23+25 14.4171 1.40 |Q | | | V|
23+30 14.4267 1.40 |Q | | | V|
23+35 14.4364 1.40 |Q | | | V|
23+40 14.4461 1.40 |Q | | | V|
23+45 14.4557 1.40 |Q | | | V|
23+50 14.4654 1.40 |Q | | | V|
23+55 14.4750 1.40 |Q | | | V|
24+ 0 14.4847 1.40 |Q | | | V|
24+ 5 14.4924 1.11 |Q | | | V|
24+10 14.4954 0.43 Q | | | V|
24+15 14.4969 0.22 Q | | | V|
24+20 14.4977 0.13 Q | | | V|
24+25 14.4982 0.07 Q | | | V|
24+30 14.4985 0.04 Q | | | V|
24+35 14.4986 0.02 Q | | | V
-----------------------------------------------------------------------

Page 10 ends

F.1.k
Packet Pg. 1893 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1001100
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR1001100.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 100-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 1 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 0.50 33.55
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.20 80.52
STORM EVENT (YEAR) = 100.00
Area Averaged 2-Year Rainfall = 0.500(In)
Area Averaged 100-Year Rainfall = 1.200(In)
Point rain (area averaged) = 1.200(In)
Areal adjustment factor = 99.94 %
Adjusted average point rain = 1.199(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-3 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 74.8 0.305 0.900 0.058 1.000 0.058
Sum (F) = 0.058

Page 1 ends

F.1.k
Packet Pg. 1894 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1001100
Area averaged mean soil loss (F) (In/Hr) = 0.058
Minimum soil loss rate ((In/Hr)) = 0.029
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- Slope of intensity-duration curve for a 1 hour storm =0.5000 ---------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 4.20 0.604 0.058 ( 0.060) 0.546
2 0.17 4.30 0.619 0.058 ( 0.062) 0.561
3 0.25 5.00 0.720 0.058 ( 0.072) 0.662
4 0.33 5.00 0.720 0.058 ( 0.072) 0.662
5 0.42 5.80 0.835 0.058 ( 0.083) 0.777
6 0.50 6.50 0.935 0.058 ( 0.094) 0.877
7 0.58 7.40 1.065 0.058 ( 0.106) 1.007
8 0.67 8.60 1.238 0.058 ( 0.124) 1.180
9 0.75 12.30 1.770 0.058 ( 0.177) 1.712
10 0.83 29.10 4.188 0.058 ( 0.419) 4.130
11 0.92 6.80 0.979 0.058 ( 0.098) 0.921
12 1.00 5.00 0.720 0.058 ( 0.072) 0.662
(Loss Rate Not Used)
Sum = 100.0 Sum = 13.7
Flood volume = Effective rainfall 1.14(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 6.4(Ac.Ft)
Total soil loss = 0.06(In)
Total soil loss = 0.324(Ac.Ft)
Total rainfall = 1.20(In)
Flood volume = 277978.1 Cubic Feet
Total soil loss = 14131.7 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 176.999(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 50.0 100.0 150.0 200.0
----------------------------------------------------------------------- 0+ 5 0.0525 7.62 VQ | | | |
0+10 0.2303 25.82 |V Q | | | |
0+15 0.4592 33.23 | V Q | | | |
0+20 0.7293 39.22 | V Q | | | |
0+25 1.0276 43.32 | V Q | | | |
0+30 1.3714 49.92 | VQ| | | |
0+35 1.7642 57.03 | |Q | | |
0+40 2.2179 65.89 | | Q | | |
0+45 2.7771 81.18 | | QV | | |
0+50 3.7090 135.32 | | | V Q | |
0+55 4.9280 177.00 | | | V Q |

Page 2 ends

F.1.k
Packet Pg. 1895 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1001100
1+ 0 5.5857 95.50 | | Q| | V |
1+ 5 5.9868 58.24 | |Q | | V |
1+10 6.1686 26.39 | Q | | | V |
1+15 6.2711 14.88 | Q | | | V|
1+20 6.3310 8.71 |Q | | | V|
1+25 6.3681 5.38 |Q | | | V|
1+30 6.3778 1.41 Q | | | V|
1+35 6.3815 0.54 Q | | | V
-----------------------------------------------------------------------

Page 3 ends

F.1.k
Packet Pg. 1896 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1003100
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR1003100.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 100-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 3 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 0.80 53.68
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.86 124.81
STORM EVENT (YEAR) = 100.00
Area Averaged 2-Year Rainfall = 0.800(In)
Area Averaged 100-Year Rainfall = 1.860(In)
Point rain (area averaged) = 1.860(In)
Areal adjustment factor = 99.97 %
Adjusted average point rain = 1.859(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-3 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 74.8 0.305 0.900 0.058 1.000 0.058
Sum (F) = 0.058

Page 1 ends

F.1.k
Packet Pg. 1897 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1003100
Area averaged mean soil loss (F) (In/Hr) = 0.058
Minimum soil loss rate ((In/Hr)) = 0.029
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 1.30 0.290 ( 0.058) 0.029 0.261
2 0.17 1.30 0.290 ( 0.058) 0.029 0.261
3 0.25 1.10 0.245 ( 0.058) 0.025 0.221
4 0.33 1.50 0.335 ( 0.058) 0.033 0.301
5 0.42 1.50 0.335 ( 0.058) 0.033 0.301
6 0.50 1.80 0.402 ( 0.058) 0.040 0.361
7 0.58 1.50 0.335 ( 0.058) 0.033 0.301
8 0.67 1.80 0.402 ( 0.058) 0.040 0.361
9 0.75 1.80 0.402 ( 0.058) 0.040 0.361
10 0.83 1.50 0.335 ( 0.058) 0.033 0.301
11 0.92 1.60 0.357 ( 0.058) 0.036 0.321
12 1.00 1.80 0.402 ( 0.058) 0.040 0.361
13 1.08 2.20 0.491 ( 0.058) 0.049 0.442
14 1.17 2.20 0.491 ( 0.058) 0.049 0.442
15 1.25 2.20 0.491 ( 0.058) 0.049 0.442
16 1.33 2.00 0.446 ( 0.058) 0.045 0.402
17 1.42 2.60 0.580 ( 0.058) 0.058 0.522
18 1.50 2.70 0.602 0.058 ( 0.060) 0.544
19 1.58 2.40 0.536 ( 0.058) 0.054 0.482
20 1.67 2.70 0.602 0.058 ( 0.060) 0.544
21 1.75 3.30 0.736 0.058 ( 0.074) 0.678
22 1.83 3.10 0.692 0.058 ( 0.069) 0.634
23 1.92 2.90 0.647 0.058 ( 0.065) 0.589
24 2.00 3.00 0.669 0.058 ( 0.067) 0.611
25 2.08 3.10 0.692 0.058 ( 0.069) 0.634
26 2.17 4.20 0.937 0.058 ( 0.094) 0.879
27 2.25 5.00 1.116 0.058 ( 0.112) 1.058
28 2.33 3.50 0.781 0.058 ( 0.078) 0.723
29 2.42 6.80 1.517 0.058 ( 0.152) 1.459
30 2.50 7.30 1.629 0.058 ( 0.163) 1.571
31 2.58 8.20 1.830 0.058 ( 0.183) 1.772
32 2.67 5.90 1.316 0.058 ( 0.132) 1.258
33 2.75 2.00 0.446 ( 0.058) 0.045 0.402
34 2.83 1.80 0.402 ( 0.058) 0.040 0.361
35 2.92 1.80 0.402 ( 0.058) 0.040 0.361
36 3.00 0.60 0.134 ( 0.058) 0.013 0.120
(Loss Rate Not Used)
Sum = 100.0 Sum = 20.6
Flood volume = Effective rainfall 1.72(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 9.6(Ac.Ft)
Total soil loss = 0.14(In)
Total soil loss = 0.777(Ac.Ft)
Total rainfall = 1.86(In)
Flood volume = 419079.2 Cubic Feet
Total soil loss = 33833.6 Cubic Feet
--------------------------------------------------------------------

Page 2 ends

F.1.k
Packet Pg. 1898 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1003100
Peak flow rate of this hydrograph = 103.548(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 50.0 100.0 150.0 200.0
----------------------------------------------------------------------- 0+ 5 0.0251 3.64 Q | | | |
0+10 0.1094 12.24 V Q | | | |
0+15 0.2080 14.32 V Q | | | |
0+20 0.3136 15.33 |V Q | | | |
0+25 0.4392 18.24 |V Q | | | |
0+30 0.5779 20.14 | V Q | | | |
0+35 0.7280 21.81 | VQ | | | |
0+40 0.8770 21.63 | VQ | | | |
0+45 1.0380 23.37 | Q | | | |
0+50 1.1968 23.07 | Q | | | |
0+55 1.3459 21.65 | QV | | | |
1+ 0 1.5000 22.38 | Q V | | | |
1+ 5 1.6710 24.83 | Q V | | | |
1+10 1.8627 27.83 | Q V | | | |
1+15 2.0613 28.83 | Q V | | | |
1+20 2.2591 28.72 | Q V| | | |
1+25 2.4611 29.32 | Q V | | |
1+30 2.6910 33.38 | Q |V | | |
1+35 2.9279 34.40 | Q | V | | |
1+40 3.1617 33.95 | Q | V | | |
1+45 3.4206 37.59 | Q | V | | |
1+50 3.7095 41.94 | Q | V | | |
1+55 3.9950 41.46 | Q | V | | |
2+ 0 4.2749 40.64 | Q | V | | |
2+ 5 4.5602 41.43 | Q | V | | |
2+10 4.8751 45.73 | Q| V | |
2+15 5.2651 56.63 | |Q |V | |
2+20 5.6816 60.48 | | Q | V | |
2+25 6.1133 62.68 | | Q | V | |
2+30 6.7095 86.57 | | Q | V | |
2+35 7.3973 99.87 | | Q| V |
2+40 8.1105 103.55 | | Q | V |
2+45 8.6543 78.97 | | Q | | V |
2+50 8.9795 47.23 | Q| | | V |
2+55 9.2275 36.01 | Q | | | V |
3+ 0 9.4204 28.01 | Q | | | V|
3+ 5 9.5268 15.45 | Q | | | V|
3+10 9.5762 7.18 |Q | | | V|
3+15 9.6004 3.51 Q | | | V|
3+20 9.6113 1.59 Q | | | V|
3+25 9.6172 0.85 Q | | | V|
3+30 9.6201 0.42 Q | | | V|
3+35 9.6207 0.10 Q | | | V|
-----------------------------------------------------------------------

Page 3 ends

F.1.k
Packet Pg. 1899 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1006100
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR1006100.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 100-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 6 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.15 77.16
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 2.50 167.75
STORM EVENT (YEAR) = 100.00
Area Averaged 2-Year Rainfall = 1.150(In)
Area Averaged 100-Year Rainfall = 2.500(In)
Point rain (area averaged) = 2.500(In)
Areal adjustment factor = 99.98 %
Adjusted average point rain = 2.499(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-3 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 74.8 0.305 0.900 0.058 1.000 0.058
Sum (F) = 0.058

Page 1 ends

F.1.k
Packet Pg. 1900 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1006100
Area averaged mean soil loss (F) (In/Hr) = 0.058
Minimum soil loss rate ((In/Hr)) = 0.029
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 0.50 0.150 ( 0.058) 0.015 0.135
2 0.17 0.60 0.180 ( 0.058) 0.018 0.162
3 0.25 0.60 0.180 ( 0.058) 0.018 0.162
4 0.33 0.60 0.180 ( 0.058) 0.018 0.162
5 0.42 0.60 0.180 ( 0.058) 0.018 0.162
6 0.50 0.70 0.210 ( 0.058) 0.021 0.189
7 0.58 0.70 0.210 ( 0.058) 0.021 0.189
8 0.67 0.70 0.210 ( 0.058) 0.021 0.189
9 0.75 0.70 0.210 ( 0.058) 0.021 0.189
10 0.83 0.70 0.210 ( 0.058) 0.021 0.189
11 0.92 0.70 0.210 ( 0.058) 0.021 0.189
12 1.00 0.80 0.240 ( 0.058) 0.024 0.216
13 1.08 0.80 0.240 ( 0.058) 0.024 0.216
14 1.17 0.80 0.240 ( 0.058) 0.024 0.216
15 1.25 0.80 0.240 ( 0.058) 0.024 0.216
16 1.33 0.80 0.240 ( 0.058) 0.024 0.216
17 1.42 0.80 0.240 ( 0.058) 0.024 0.216
18 1.50 0.80 0.240 ( 0.058) 0.024 0.216
19 1.58 0.80 0.240 ( 0.058) 0.024 0.216
20 1.67 0.80 0.240 ( 0.058) 0.024 0.216
21 1.75 0.80 0.240 ( 0.058) 0.024 0.216
22 1.83 0.80 0.240 ( 0.058) 0.024 0.216
23 1.92 0.80 0.240 ( 0.058) 0.024 0.216
24 2.00 0.90 0.270 ( 0.058) 0.027 0.243
25 2.08 0.80 0.240 ( 0.058) 0.024 0.216
26 2.17 0.90 0.270 ( 0.058) 0.027 0.243
27 2.25 0.90 0.270 ( 0.058) 0.027 0.243
28 2.33 0.90 0.270 ( 0.058) 0.027 0.243
29 2.42 0.90 0.270 ( 0.058) 0.027 0.243
30 2.50 0.90 0.270 ( 0.058) 0.027 0.243
31 2.58 0.90 0.270 ( 0.058) 0.027 0.243
32 2.67 0.90 0.270 ( 0.058) 0.027 0.243
33 2.75 1.00 0.300 ( 0.058) 0.030 0.270
34 2.83 1.00 0.300 ( 0.058) 0.030 0.270
35 2.92 1.00 0.300 ( 0.058) 0.030 0.270
36 3.00 1.00 0.300 ( 0.058) 0.030 0.270
37 3.08 1.00 0.300 ( 0.058) 0.030 0.270
38 3.17 1.10 0.330 ( 0.058) 0.033 0.297
39 3.25 1.10 0.330 ( 0.058) 0.033 0.297
40 3.33 1.10 0.330 ( 0.058) 0.033 0.297
41 3.42 1.20 0.360 ( 0.058) 0.036 0.324
42 3.50 1.30 0.390 ( 0.058) 0.039 0.351
43 3.58 1.40 0.420 ( 0.058) 0.042 0.378
44 3.67 1.40 0.420 ( 0.058) 0.042 0.378
45 3.75 1.50 0.450 ( 0.058) 0.045 0.405
46 3.83 1.50 0.450 ( 0.058) 0.045 0.405

Page 2 ends

F.1.k
Packet Pg. 1901 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1006100
47 3.92 1.60 0.480 ( 0.058) 0.048 0.432
48 4.00 1.60 0.480 ( 0.058) 0.048 0.432
49 4.08 1.70 0.510 ( 0.058) 0.051 0.459
50 4.17 1.80 0.540 ( 0.058) 0.054 0.486
51 4.25 1.90 0.570 ( 0.058) 0.057 0.513
52 4.33 2.00 0.600 0.058 ( 0.060) 0.542
53 4.42 2.10 0.630 0.058 ( 0.063) 0.572
54 4.50 2.10 0.630 0.058 ( 0.063) 0.572
55 4.58 2.20 0.660 0.058 ( 0.066) 0.602
56 4.67 2.30 0.690 0.058 ( 0.069) 0.632
57 4.75 2.40 0.720 0.058 ( 0.072) 0.662
58 4.83 2.40 0.720 0.058 ( 0.072) 0.662
59 4.92 2.50 0.750 0.058 ( 0.075) 0.692
60 5.00 2.60 0.780 0.058 ( 0.078) 0.722
61 5.08 3.10 0.930 0.058 ( 0.093) 0.872
62 5.17 3.60 1.080 0.058 ( 0.108) 1.022
63 5.25 3.90 1.170 0.058 ( 0.117) 1.112
64 5.33 4.20 1.260 0.058 ( 0.126) 1.202
65 5.42 4.70 1.410 0.058 ( 0.141) 1.352
66 5.50 5.60 1.680 0.058 ( 0.168) 1.622
67 5.58 1.90 0.570 ( 0.058) 0.057 0.513
68 5.67 0.90 0.270 ( 0.058) 0.027 0.243
69 5.75 0.60 0.180 ( 0.058) 0.018 0.162
70 5.83 0.50 0.150 ( 0.058) 0.015 0.135
71 5.92 0.30 0.090 ( 0.058) 0.009 0.081
72 6.00 0.20 0.060 ( 0.058) 0.006 0.054
(Loss Rate Not Used)
Sum = 100.0 Sum = 27.5
Flood volume = Effective rainfall 2.29(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 12.8(Ac.Ft)
Total soil loss = 0.21(In)
Total soil loss = 1.164(Ac.Ft)
Total rainfall = 2.50(In)
Flood volume = 558070.0 Cubic Feet
Total soil loss = 50722.1 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 89.787(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 22.5 45.0 67.5 90.0
----------------------------------------------------------------------- 0+ 5 0.0130 1.88 Q | | | |
0+10 0.0591 6.70 V Q | | | |
0+15 0.1208 8.96 V Q | | | |
0+20 0.1887 9.86 V Q | | | |
0+25 0.2599 10.33 V Q | | | |
0+30 0.3356 11.00 |V Q | | | |
0+35 0.4187 12.06 |V Q | | | |
0+40 0.5046 12.48 |V Q | | | |
0+45 0.5915 12.62 |V Q | | | |
0+50 0.6790 12.69 | V Q | | | |
0+55 0.7667 12.74 | V Q | | | |
1+ 0 0.8572 13.14 | V Q | | | |
1+ 5 0.9539 14.05 | V Q | | | |
1+10 1.0526 14.32 | V Q | | | |
1+15 1.1521 14.45 | V Q | | | |
1+20 1.2521 14.52 | V Q | | | |
1+25 1.3524 14.56 | V Q | | | |
1+30 1.4528 14.59 | V Q | | | |
1+35 1.5535 14.61 | V Q | | | |
1+40 1.6541 14.61 | VQ | | | |
1+45 1.7547 14.61 | VQ | | | |
1+50 1.8553 14.61 | VQ | | | |
1+55 1.9560 14.61 | Q | | | |
2+ 0 2.0592 14.99 | Q | | | |
2+ 5 2.1659 15.50 | Q | | | |
2+10 2.2710 15.26 | QV | | | |
2+15 2.3812 16.00 | Q | | | |
2+20 2.4929 16.22 | Q | | | |
2+25 2.6053 16.32 | QV | | | |
2+30 2.7181 16.37 | QV | | | |

Page 3 ends

F.1.k
Packet Pg. 1902 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR1006100
2+35 2.8311 16.41 | QV | | | |
2+40 2.9441 16.42 | Q V| | | |
2+45 3.0599 16.81 | Q V| | | |
2+50 3.1819 17.70 | Q V| | | |
2+55 3.3057 17.98 | Q V | | |
3+ 0 3.4303 18.10 | Q V | | |
3+ 5 3.5555 18.17 | Q |V | | |
3+10 3.6835 18.59 | Q |V | | |
3+15 3.8179 19.51 | Q |V | | |
3+20 3.9542 19.80 | Q | V | | |
3+25 4.0941 20.30 | Q| V | | |
3+30 4.2431 21.64 | Q| V | | |
3+35 4.4030 23.22 | Q V | | |
3+40 4.5720 24.54 | Q V | | |
3+45 4.7470 25.40 | |Q V | | |
3+50 4.9297 26.53 | |Q V | | |
3+55 5.1178 27.32 | | Q V | | |
4+ 0 5.3136 28.43 | | Q V | | |
4+ 5 5.5147 29.20 | | Q V | | |
4+10 5.7258 30.65 | | Q V | | |
4+15 5.9482 32.29 | | Q V | | |
4+20 6.1826 34.05 | | Q V| | |
4+25 6.4300 35.91 | | Q V | |
4+30 6.6879 37.45 | | Q V | |
4+35 6.9527 38.45 | | Q |V | |
4+40 7.2293 40.16 | | Q | V | |
4+45 7.5189 42.05 | | Q | V | |
4+50 7.8190 43.58 | | Q| V | |
4+55 8.1260 44.57 | | Q| V | |
5+ 0 8.4446 46.26 | | Q V | |
5+ 5 8.7876 49.80 | | | Q V | |
5+10 9.1828 57.38 | | | Q V | |
5+15 9.6329 65.36 | | | QV |
5+20 10.1284 71.94 | | | |Q |
5+25 10.6730 79.07 | | | | V Q |
5+30 11.2913 89.79 | | | | V Q|
5+35 11.8822 85.80 | | | | VQ |
5+40 12.2238 49.60 | | | Q | V |
5+45 12.4328 30.34 | | Q | | V |
5+50 12.5742 20.54 | Q| | | V|
5+55 12.6751 14.65 | Q | | | V|
6+ 0 12.7420 9.72 | Q | | | V|
6+ 5 12.7825 5.87 | Q | | | V|
6+10 12.7976 2.19 Q | | | V|
6+15 12.8048 1.04 Q | | | V|
6+20 12.8085 0.54 Q | | | V|
6+25 12.8104 0.28 Q | | | V|
6+30 12.8112 0.12 Q | | | V|
6+35 12.8115 0.04 Q | | | V|
-----------------------------------------------------------------------

Page 4 ends

F.1.k
Packet Pg. 1903 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0 Study date 07/31/20 File: 3828PR10024100.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ------------------------------------------------------------------------ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6400
--------------------------------------------------------------------- English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
--------------------------------------------------------------------- TEI JOB 3828
OPTION 1 - HIGH CUBE
PROPOSED CONDITION 100-YEAR STORM EVENT
-------------------------------------------------------------------- Drainage Area = 67.10(Ac.) = 0.105 Sq. Mi.

Drainage Area for Depth-Area Areal Adjustment = 67.10(Ac.) = 0.105 Sq. Mi.

Length along longest watercourse = 3400.00(Ft.)
Length along longest watercourse measured to centroid = 1280.00(Ft.) Length along longest watercourse = 0.644 Mi.

Length along longest watercourse measured to centroid = 0.242 Mi.

Difference in elevation = 44.00(Ft.)
Slope along watercourse = 68.3294 Ft./Mi.

Average Manning's 'N' = 0.015
Lag time = 0.080 Hr.

Lag time = 4.78 Min.
25% of lag time = 1.19 Min.
40% of lag time = 1.91 Min.

Unit time = 5.00 Min.

Duration of storm = 24 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 1.75 117.42
100 YEAR Area rainfall data:

Area(Ac.)[1] Rainfall(In)[2] Weighting[1*2]

67.10 4.50 301.95
STORM EVENT (YEAR) = 100.00
Area Averaged 2-Year Rainfall = 1.750(In)
Area Averaged 100-Year Rainfall = 4.500(In)
Point rain (area averaged) = 4.500(In)
Areal adjustment factor = 99.99 %
Adjusted average point rain = 4.499(In)
Sub-Area Data:

Area(Ac.) Runoff Index Impervious %

67.100 56.00 0.900
Total Area Entered = 67.10(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC-3 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)

56.0 74.8 0.305 0.900 0.058 1.000 0.058
Sum (F) = 0.058

Page 1 ends

F.1.k
Packet Pg. 1904 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
Area averaged mean soil loss (F) (In/Hr) = 0.058
Minimum soil loss rate ((In/Hr)) = 0.029
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.100
--------------------------------------------------------------------- U n i t H y d r o g r a p h
VALLEY S-Curve
-------------------------------------------------------------------- Unit Hydrograph Data
--------------------------------------------------------------------- Unit time period Time % of lag Distribution Unit Hydrograph (hrs) Graph % (CFS)
--------------------------------------------------------------------- 1 0.083 104.614 20.612 13.939
2 0.167 209.229 48.679 32.919
3 0.250 313.843 14.978 10.129
4 0.333 418.458 6.821 4.613
5 0.417 523.072 3.802 2.571
6 0.500 627.687 2.435 1.647
7 0.583 732.301 1.462 0.989
8 0.667 836.916 1.210 0.818
Sum = 100.000 Sum= 67.624
----------------------------------------------------------------------- The following loss rate calculations reflect use of the minimum calculated loss rate subtracted from the Storm Rain to produce the maximum Effective Rain value Unit Time Pattern Storm Rain Loss rate(In./Hr) Effective (Hr.) Percent (In/Hr) Max | Low (In/Hr)
1 0.08 0.07 0.036 ( 0.103) 0.004 0.032
2 0.17 0.07 0.036 ( 0.102) 0.004 0.032
3 0.25 0.07 0.036 ( 0.102) 0.004 0.032
4 0.33 0.10 0.054 ( 0.102) 0.005 0.049
5 0.42 0.10 0.054 ( 0.101) 0.005 0.049
6 0.50 0.10 0.054 ( 0.101) 0.005 0.049
7 0.58 0.10 0.054 ( 0.100) 0.005 0.049
8 0.67 0.10 0.054 ( 0.100) 0.005 0.049
9 0.75 0.10 0.054 ( 0.100) 0.005 0.049
10 0.83 0.13 0.072 ( 0.099) 0.007 0.065
11 0.92 0.13 0.072 ( 0.099) 0.007 0.065
12 1.00 0.13 0.072 ( 0.099) 0.007 0.065
13 1.08 0.10 0.054 ( 0.098) 0.005 0.049
14 1.17 0.10 0.054 ( 0.098) 0.005 0.049
15 1.25 0.10 0.054 ( 0.097) 0.005 0.049
16 1.33 0.10 0.054 ( 0.097) 0.005 0.049
17 1.42 0.10 0.054 ( 0.097) 0.005 0.049
18 1.50 0.10 0.054 ( 0.096) 0.005 0.049
19 1.58 0.10 0.054 ( 0.096) 0.005 0.049
20 1.67 0.10 0.054 ( 0.095) 0.005 0.049
21 1.75 0.10 0.054 ( 0.095) 0.005 0.049
22 1.83 0.13 0.072 ( 0.095) 0.007 0.065
23 1.92 0.13 0.072 ( 0.094) 0.007 0.065
24 2.00 0.13 0.072 ( 0.094) 0.007 0.065
25 2.08 0.13 0.072 ( 0.094) 0.007 0.065
26 2.17 0.13 0.072 ( 0.093) 0.007 0.065
27 2.25 0.13 0.072 ( 0.093) 0.007 0.065
28 2.33 0.13 0.072 ( 0.092) 0.007 0.065
29 2.42 0.13 0.072 ( 0.092) 0.007 0.065
30 2.50 0.13 0.072 ( 0.092) 0.007 0.065
31 2.58 0.17 0.090 ( 0.091) 0.009 0.081
32 2.67 0.17 0.090 ( 0.091) 0.009 0.081
33 2.75 0.17 0.090 ( 0.091) 0.009 0.081
34 2.83 0.17 0.090 ( 0.090) 0.009 0.081
35 2.92 0.17 0.090 ( 0.090) 0.009 0.081
36 3.00 0.17 0.090 ( 0.089) 0.009 0.081
37 3.08 0.17 0.090 ( 0.089) 0.009 0.081
38 3.17 0.17 0.090 ( 0.089) 0.009 0.081
39 3.25 0.17 0.090 ( 0.088) 0.009 0.081
40 3.33 0.17 0.090 ( 0.088) 0.009 0.081
41 3.42 0.17 0.090 ( 0.088) 0.009 0.081
42 3.50 0.17 0.090 ( 0.087) 0.009 0.081
43 3.58 0.17 0.090 ( 0.087) 0.009 0.081
44 3.67 0.17 0.090 ( 0.086) 0.009 0.081
45 3.75 0.17 0.090 ( 0.086) 0.009 0.081
46 3.83 0.20 0.108 ( 0.086) 0.011 0.097

Page 2 ends

F.1.k
Packet Pg. 1905 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
47 3.92 0.20 0.108 ( 0.085) 0.011 0.097
48 4.00 0.20 0.108 ( 0.085) 0.011 0.097
49 4.08 0.20 0.108 ( 0.085) 0.011 0.097
50 4.17 0.20 0.108 ( 0.084) 0.011 0.097
51 4.25 0.20 0.108 ( 0.084) 0.011 0.097
52 4.33 0.23 0.126 ( 0.084) 0.013 0.113
53 4.42 0.23 0.126 ( 0.083) 0.013 0.113
54 4.50 0.23 0.126 ( 0.083) 0.013 0.113
55 4.58 0.23 0.126 ( 0.082) 0.013 0.113
56 4.67 0.23 0.126 ( 0.082) 0.013 0.113
57 4.75 0.23 0.126 ( 0.082) 0.013 0.113
58 4.83 0.27 0.144 ( 0.081) 0.014 0.130
59 4.92 0.27 0.144 ( 0.081) 0.014 0.130
60 5.00 0.27 0.144 ( 0.081) 0.014 0.130
61 5.08 0.20 0.108 ( 0.080) 0.011 0.097
62 5.17 0.20 0.108 ( 0.080) 0.011 0.097
63 5.25 0.20 0.108 ( 0.080) 0.011 0.097
64 5.33 0.23 0.126 ( 0.079) 0.013 0.113
65 5.42 0.23 0.126 ( 0.079) 0.013 0.113
66 5.50 0.23 0.126 ( 0.079) 0.013 0.113
67 5.58 0.27 0.144 ( 0.078) 0.014 0.130
68 5.67 0.27 0.144 ( 0.078) 0.014 0.130
69 5.75 0.27 0.144 ( 0.078) 0.014 0.130
70 5.83 0.27 0.144 ( 0.077) 0.014 0.130
71 5.92 0.27 0.144 ( 0.077) 0.014 0.130
72 6.00 0.27 0.144 ( 0.077) 0.014 0.130
73 6.08 0.30 0.162 ( 0.076) 0.016 0.146
74 6.17 0.30 0.162 ( 0.076) 0.016 0.146
75 6.25 0.30 0.162 ( 0.076) 0.016 0.146
76 6.33 0.30 0.162 ( 0.075) 0.016 0.146
77 6.42 0.30 0.162 ( 0.075) 0.016 0.146
78 6.50 0.30 0.162 ( 0.075) 0.016 0.146
79 6.58 0.33 0.180 ( 0.074) 0.018 0.162
80 6.67 0.33 0.180 ( 0.074) 0.018 0.162
81 6.75 0.33 0.180 ( 0.074) 0.018 0.162
82 6.83 0.33 0.180 ( 0.073) 0.018 0.162
83 6.92 0.33 0.180 ( 0.073) 0.018 0.162
84 7.00 0.33 0.180 ( 0.073) 0.018 0.162
85 7.08 0.33 0.180 ( 0.072) 0.018 0.162
86 7.17 0.33 0.180 ( 0.072) 0.018 0.162
87 7.25 0.33 0.180 ( 0.072) 0.018 0.162
88 7.33 0.37 0.198 ( 0.071) 0.020 0.178
89 7.42 0.37 0.198 ( 0.071) 0.020 0.178
90 7.50 0.37 0.198 ( 0.071) 0.020 0.178
91 7.58 0.40 0.216 ( 0.070) 0.022 0.194
92 7.67 0.40 0.216 ( 0.070) 0.022 0.194
93 7.75 0.40 0.216 ( 0.070) 0.022 0.194
94 7.83 0.43 0.234 ( 0.069) 0.023 0.211
95 7.92 0.43 0.234 ( 0.069) 0.023 0.211
96 8.00 0.43 0.234 ( 0.069) 0.023 0.211
97 8.08 0.50 0.270 ( 0.068) 0.027 0.243
98 8.17 0.50 0.270 ( 0.068) 0.027 0.243
99 8.25 0.50 0.270 ( 0.068) 0.027 0.243
100 8.33 0.50 0.270 ( 0.067) 0.027 0.243
101 8.42 0.50 0.270 ( 0.067) 0.027 0.243
102 8.50 0.50 0.270 ( 0.067) 0.027 0.243
103 8.58 0.53 0.288 ( 0.066) 0.029 0.259
104 8.67 0.53 0.288 ( 0.066) 0.029 0.259
105 8.75 0.53 0.288 ( 0.066) 0.029 0.259
106 8.83 0.57 0.306 ( 0.066) 0.031 0.275
107 8.92 0.57 0.306 ( 0.065) 0.031 0.275
108 9.00 0.57 0.306 ( 0.065) 0.031 0.275
109 9.08 0.63 0.342 ( 0.065) 0.034 0.308
110 9.17 0.63 0.342 ( 0.064) 0.034 0.308
111 9.25 0.63 0.342 ( 0.064) 0.034 0.308
112 9.33 0.67 0.360 ( 0.064) 0.036 0.324
113 9.42 0.67 0.360 ( 0.063) 0.036 0.324
114 9.50 0.67 0.360 ( 0.063) 0.036 0.324
115 9.58 0.70 0.378 ( 0.063) 0.038 0.340
116 9.67 0.70 0.378 ( 0.062) 0.038 0.340
117 9.75 0.70 0.378 ( 0.062) 0.038 0.340
118 9.83 0.73 0.396 ( 0.062) 0.040 0.356
119 9.92 0.73 0.396 ( 0.062) 0.040 0.356
120 10.00 0.73 0.396 ( 0.061) 0.040 0.356
121 10.08 0.50 0.270 ( 0.061) 0.027 0.243
122 10.17 0.50 0.270 ( 0.061) 0.027 0.243
123 10.25 0.50 0.270 ( 0.060) 0.027 0.243

Page 3 ends

F.1.k
Packet Pg. 1906 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
124 10.33 0.50 0.270 ( 0.060) 0.027 0.243
125 10.42 0.50 0.270 ( 0.060) 0.027 0.243
126 10.50 0.50 0.270 ( 0.060) 0.027 0.243
127 10.58 0.67 0.360 ( 0.059) 0.036 0.324
128 10.67 0.67 0.360 ( 0.059) 0.036 0.324
129 10.75 0.67 0.360 ( 0.059) 0.036 0.324
130 10.83 0.67 0.360 ( 0.058) 0.036 0.324
131 10.92 0.67 0.360 ( 0.058) 0.036 0.324
132 11.00 0.67 0.360 ( 0.058) 0.036 0.324
133 11.08 0.63 0.342 ( 0.057) 0.034 0.308
134 11.17 0.63 0.342 ( 0.057) 0.034 0.308
135 11.25 0.63 0.342 ( 0.057) 0.034 0.308
136 11.33 0.63 0.342 ( 0.057) 0.034 0.308
137 11.42 0.63 0.342 ( 0.056) 0.034 0.308
138 11.50 0.63 0.342 ( 0.056) 0.034 0.308
139 11.58 0.57 0.306 ( 0.056) 0.031 0.275
140 11.67 0.57 0.306 ( 0.056) 0.031 0.275
141 11.75 0.57 0.306 ( 0.055) 0.031 0.275
142 11.83 0.60 0.324 ( 0.055) 0.032 0.292
143 11.92 0.60 0.324 ( 0.055) 0.032 0.292
144 12.00 0.60 0.324 ( 0.054) 0.032 0.292
145 12.08 0.83 0.450 ( 0.054) 0.045 0.405
146 12.17 0.83 0.450 ( 0.054) 0.045 0.405
147 12.25 0.83 0.450 ( 0.054) 0.045 0.405
148 12.33 0.87 0.468 ( 0.053) 0.047 0.421
149 12.42 0.87 0.468 ( 0.053) 0.047 0.421
150 12.50 0.87 0.468 ( 0.053) 0.047 0.421
151 12.58 0.93 0.504 ( 0.053) 0.050 0.454
152 12.67 0.93 0.504 ( 0.052) 0.050 0.454
153 12.75 0.93 0.504 ( 0.052) 0.050 0.454
154 12.83 0.97 0.522 0.052 ( 0.052) 0.470
155 12.92 0.97 0.522 0.051 ( 0.052) 0.470
156 13.00 0.97 0.522 0.051 ( 0.052) 0.471
157 13.08 1.13 0.612 0.051 ( 0.061) 0.561
158 13.17 1.13 0.612 0.051 ( 0.061) 0.561
159 13.25 1.13 0.612 0.050 ( 0.061) 0.561
160 13.33 1.13 0.612 0.050 ( 0.061) 0.562
161 13.42 1.13 0.612 0.050 ( 0.061) 0.562
162 13.50 1.13 0.612 0.050 ( 0.061) 0.562
163 13.58 0.77 0.414 ( 0.049) 0.041 0.373
164 13.67 0.77 0.414 ( 0.049) 0.041 0.373
165 13.75 0.77 0.414 ( 0.049) 0.041 0.373
166 13.83 0.77 0.414 ( 0.049) 0.041 0.373
167 13.92 0.77 0.414 ( 0.048) 0.041 0.373
168 14.00 0.77 0.414 ( 0.048) 0.041 0.373
169 14.08 0.90 0.486 0.048 ( 0.049) 0.438
170 14.17 0.90 0.486 0.048 ( 0.049) 0.438
171 14.25 0.90 0.486 0.047 ( 0.049) 0.438
172 14.33 0.87 0.468 ( 0.047) 0.047 0.421
173 14.42 0.87 0.468 ( 0.047) 0.047 0.421
174 14.50 0.87 0.468 0.047 ( 0.047) 0.421
175 14.58 0.87 0.468 0.046 ( 0.047) 0.421
176 14.67 0.87 0.468 0.046 ( 0.047) 0.422
177 14.75 0.87 0.468 0.046 ( 0.047) 0.422
178 14.83 0.83 0.450 ( 0.046) 0.045 0.405
179 14.92 0.83 0.450 ( 0.046) 0.045 0.405
180 15.00 0.83 0.450 ( 0.045) 0.045 0.405
181 15.08 0.80 0.432 ( 0.045) 0.043 0.389
182 15.17 0.80 0.432 ( 0.045) 0.043 0.389
183 15.25 0.80 0.432 ( 0.045) 0.043 0.389
184 15.33 0.77 0.414 ( 0.044) 0.041 0.373
185 15.42 0.77 0.414 ( 0.044) 0.041 0.373
186 15.50 0.77 0.414 ( 0.044) 0.041 0.373
187 15.58 0.63 0.342 ( 0.044) 0.034 0.308
188 15.67 0.63 0.342 ( 0.043) 0.034 0.308
189 15.75 0.63 0.342 ( 0.043) 0.034 0.308
190 15.83 0.63 0.342 ( 0.043) 0.034 0.308
191 15.92 0.63 0.342 ( 0.043) 0.034 0.308
192 16.00 0.63 0.342 ( 0.043) 0.034 0.308
193 16.08 0.13 0.072 ( 0.042) 0.007 0.065
194 16.17 0.13 0.072 ( 0.042) 0.007 0.065
195 16.25 0.13 0.072 ( 0.042) 0.007 0.065
196 16.33 0.13 0.072 ( 0.042) 0.007 0.065
197 16.42 0.13 0.072 ( 0.042) 0.007 0.065
198 16.50 0.13 0.072 ( 0.041) 0.007 0.065
199 16.58 0.10 0.054 ( 0.041) 0.005 0.049
200 16.67 0.10 0.054 ( 0.041) 0.005 0.049

Page 4 ends

F.1.k
Packet Pg. 1907 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
201 16.75 0.10 0.054 ( 0.041) 0.005 0.049
202 16.83 0.10 0.054 ( 0.040) 0.005 0.049
203 16.92 0.10 0.054 ( 0.040) 0.005 0.049
204 17.00 0.10 0.054 ( 0.040) 0.005 0.049
205 17.08 0.17 0.090 ( 0.040) 0.009 0.081
206 17.17 0.17 0.090 ( 0.040) 0.009 0.081
207 17.25 0.17 0.090 ( 0.039) 0.009 0.081
208 17.33 0.17 0.090 ( 0.039) 0.009 0.081
209 17.42 0.17 0.090 ( 0.039) 0.009 0.081
210 17.50 0.17 0.090 ( 0.039) 0.009 0.081
211 17.58 0.17 0.090 ( 0.039) 0.009 0.081
212 17.67 0.17 0.090 ( 0.038) 0.009 0.081
213 17.75 0.17 0.090 ( 0.038) 0.009 0.081
214 17.83 0.13 0.072 ( 0.038) 0.007 0.065
215 17.92 0.13 0.072 ( 0.038) 0.007 0.065
216 18.00 0.13 0.072 ( 0.038) 0.007 0.065
217 18.08 0.13 0.072 ( 0.038) 0.007 0.065
218 18.17 0.13 0.072 ( 0.037) 0.007 0.065
219 18.25 0.13 0.072 ( 0.037) 0.007 0.065
220 18.33 0.13 0.072 ( 0.037) 0.007 0.065
221 18.42 0.13 0.072 ( 0.037) 0.007 0.065
222 18.50 0.13 0.072 ( 0.037) 0.007 0.065
223 18.58 0.10 0.054 ( 0.036) 0.005 0.049
224 18.67 0.10 0.054 ( 0.036) 0.005 0.049
225 18.75 0.10 0.054 ( 0.036) 0.005 0.049
226 18.83 0.07 0.036 ( 0.036) 0.004 0.032
227 18.92 0.07 0.036 ( 0.036) 0.004 0.032
228 19.00 0.07 0.036 ( 0.036) 0.004 0.032
229 19.08 0.10 0.054 ( 0.035) 0.005 0.049
230 19.17 0.10 0.054 ( 0.035) 0.005 0.049
231 19.25 0.10 0.054 ( 0.035) 0.005 0.049
232 19.33 0.13 0.072 ( 0.035) 0.007 0.065
233 19.42 0.13 0.072 ( 0.035) 0.007 0.065
234 19.50 0.13 0.072 ( 0.035) 0.007 0.065
235 19.58 0.10 0.054 ( 0.034) 0.005 0.049
236 19.67 0.10 0.054 ( 0.034) 0.005 0.049
237 19.75 0.10 0.054 ( 0.034) 0.005 0.049
238 19.83 0.07 0.036 ( 0.034) 0.004 0.032
239 19.92 0.07 0.036 ( 0.034) 0.004 0.032
240 20.00 0.07 0.036 ( 0.034) 0.004 0.032
241 20.08 0.10 0.054 ( 0.034) 0.005 0.049
242 20.17 0.10 0.054 ( 0.033) 0.005 0.049
243 20.25 0.10 0.054 ( 0.033) 0.005 0.049
244 20.33 0.10 0.054 ( 0.033) 0.005 0.049
245 20.42 0.10 0.054 ( 0.033) 0.005 0.049
246 20.50 0.10 0.054 ( 0.033) 0.005 0.049
247 20.58 0.10 0.054 ( 0.033) 0.005 0.049
248 20.67 0.10 0.054 ( 0.033) 0.005 0.049
249 20.75 0.10 0.054 ( 0.032) 0.005 0.049
250 20.83 0.07 0.036 ( 0.032) 0.004 0.032
251 20.92 0.07 0.036 ( 0.032) 0.004 0.032
252 21.00 0.07 0.036 ( 0.032) 0.004 0.032
253 21.08 0.10 0.054 ( 0.032) 0.005 0.049
254 21.17 0.10 0.054 ( 0.032) 0.005 0.049
255 21.25 0.10 0.054 ( 0.032) 0.005 0.049
256 21.33 0.07 0.036 ( 0.032) 0.004 0.032
257 21.42 0.07 0.036 ( 0.031) 0.004 0.032
258 21.50 0.07 0.036 ( 0.031) 0.004 0.032
259 21.58 0.10 0.054 ( 0.031) 0.005 0.049
260 21.67 0.10 0.054 ( 0.031) 0.005 0.049
261 21.75 0.10 0.054 ( 0.031) 0.005 0.049
262 21.83 0.07 0.036 ( 0.031) 0.004 0.032
263 21.92 0.07 0.036 ( 0.031) 0.004 0.032
264 22.00 0.07 0.036 ( 0.031) 0.004 0.032
265 22.08 0.10 0.054 ( 0.031) 0.005 0.049
266 22.17 0.10 0.054 ( 0.030) 0.005 0.049
267 22.25 0.10 0.054 ( 0.030) 0.005 0.049
268 22.33 0.07 0.036 ( 0.030) 0.004 0.032
269 22.42 0.07 0.036 ( 0.030) 0.004 0.032
270 22.50 0.07 0.036 ( 0.030) 0.004 0.032
271 22.58 0.07 0.036 ( 0.030) 0.004 0.032
272 22.67 0.07 0.036 ( 0.030) 0.004 0.032
273 22.75 0.07 0.036 ( 0.030) 0.004 0.032
274 22.83 0.07 0.036 ( 0.030) 0.004 0.032
275 22.92 0.07 0.036 ( 0.030) 0.004 0.032
276 23.00 0.07 0.036 ( 0.030) 0.004 0.032
277 23.08 0.07 0.036 ( 0.030) 0.004 0.032

Page 5 ends

F.1.k
Packet Pg. 1908 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
278 23.17 0.07 0.036 ( 0.029) 0.004 0.032
279 23.25 0.07 0.036 ( 0.029) 0.004 0.032
280 23.33 0.07 0.036 ( 0.029) 0.004 0.032
281 23.42 0.07 0.036 ( 0.029) 0.004 0.032
282 23.50 0.07 0.036 ( 0.029) 0.004 0.032
283 23.58 0.07 0.036 ( 0.029) 0.004 0.032
284 23.67 0.07 0.036 ( 0.029) 0.004 0.032
285 23.75 0.07 0.036 ( 0.029) 0.004 0.032
286 23.83 0.07 0.036 ( 0.029) 0.004 0.032
287 23.92 0.07 0.036 ( 0.029) 0.004 0.032
288 24.00 0.07 0.036 ( 0.029) 0.004 0.032
(Loss Rate Not Used)
Sum = 100.0 Sum = 48.7
Flood volume = Effective rainfall 4.06(In)
times area 67.1(Ac.)/[(In)/(Ft.)] = 22.7(Ac.Ft)
Total soil loss = 0.44(In)
Total soil loss = 2.483(Ac.Ft)
Total rainfall = 4.50(In)
Flood volume = 987794.6 Cubic Feet
Total soil loss = 108140.2 Cubic Feet
-------------------------------------------------------------------- Peak flow rate of this hydrograph = 37.852(CFS)
-------------------------------------------------------------------- ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 24 - H O U R S T O R M
R u n o f f H y d r o g r a p h
-------------------------------------------------------------------- Hydrograph in 5 Minute intervals ((CFS))
-------------------------------------------------------------------- Time(h+m) Volume Ac.Ft Q(CFS) 0 10.0 20.0 30.0 40.0
----------------------------------------------------------------------- 0+ 5 0.0031 0.45 Q | | | |
0+10 0.0136 1.52 VQ | | | |
0+15 0.0263 1.85 VQ | | | |
0+20 0.0416 2.22 V Q | | | |
0+25 0.0612 2.84 V Q | | | |
0+30 0.0822 3.06 V Q | | | |
0+35 0.1040 3.16 V Q | | | |
0+40 0.1263 3.23 V Q | | | |
0+45 0.1487 3.26 V Q | | | |
0+50 0.1728 3.50 V Q | | | |
0+55 0.2007 4.05 V Q | | | |
1+ 0 0.2297 4.21 V Q | | | |
1+ 5 0.2576 4.06 V Q | | | |
1+10 0.2822 3.57 V Q | | | |
1+15 0.3058 3.43 V Q | | | |
1+20 0.3291 3.37 V Q | | | |
1+25 0.3521 3.34 V Q | | | |
1+30 0.3749 3.32 V Q | | | |
1+35 0.3977 3.30 V Q | | | |
1+40 0.4203 3.29 V Q | | | |
1+45 0.4430 3.29 V Q | | | |
1+50 0.4672 3.51 V Q | | | |
1+55 0.4950 4.05 V Q | | | |
2+ 0 0.5240 4.21 V Q | | | |
2+ 5 0.5536 4.29 V Q | | | |
2+10 0.5834 4.33 |V Q | | | |
2+15 0.6134 4.35 |V Q | | | |
2+20 0.6435 4.37 |V Q | | | |
2+25 0.6736 4.38 |V Q | | | |
2+30 0.7038 4.38 |V Q | | | |
2+35 0.7356 4.61 |V Q | | | |
2+40 0.7710 5.14 |V Q | | | |
2+45 0.8076 5.31 |V Q | | | |
2+50 0.8446 5.38 |V Q | | | |
2+55 0.8820 5.42 |V Q | | | |
3+ 0 0.9195 5.45 |V Q | | | |
3+ 5 0.9572 5.47 |V Q | | | |
3+10 0.9949 5.48 |V Q | | | |
3+15 1.0326 5.48 |V Q | | | |
3+20 1.0704 5.48 |V Q | | | |
3+25 1.1081 5.48 |V Q | | | |
3+30 1.1459 5.48 | V Q | | | |
3+35 1.1836 5.48 | V Q | | | |
3+40 1.2213 5.48 | V Q | | | |
3+45 1.2591 5.48 | V Q | | | |

Page 6 ends

F.1.k
Packet Pg. 1909 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
3+50 1.2984 5.71 | V Q | | | |
3+55 1.3413 6.24 | V Q | | | |
4+ 0 1.3854 6.40 | V Q | | | |
4+ 5 1.4300 6.48 | V Q | | | |
4+10 1.4749 6.52 | V Q | | | |
4+15 1.5200 6.55 | V Q | | | |
4+20 1.5668 6.79 | V Q | | | |
4+25 1.6173 7.33 | V Q | | | |
4+30 1.6689 7.50 | V Q | | | |
4+35 1.7211 7.57 | V Q | | | |
4+40 1.7736 7.62 | V Q | | | |
4+45 1.8262 7.64 | V Q | | | |
4+50 1.8805 7.88 | V Q | | | |
4+55 1.9386 8.43 | V Q | | | |
5+ 0 1.9977 8.60 | V Q | | | |
5+ 5 2.0543 8.22 | V Q | | | |
5+10 2.1039 7.19 | V Q | | | |
5+15 2.1513 6.89 | V Q | | | |
5+20 2.1994 6.98 | V Q | | | |
5+25 2.2507 7.45 | V Q | | | |
5+30 2.3028 7.56 | V Q | | | |
5+35 2.3567 7.83 | V Q | | | |
5+40 2.4144 8.37 | V Q | | | |
5+45 2.4733 8.57 | V Q | | | |
5+50 2.5330 8.66 | V Q | | | |
5+55 2.5930 8.71 | V Q | | | |
6+ 0 2.6531 8.74 | V Q | | | |
6+ 5 2.7150 8.98 | V Q | | | |
6+10 2.7806 9.53 | V Q| | | |
6+15 2.8473 9.69 | V Q| | | |
6+20 2.9146 9.77 | V Q| | | |
6+25 2.9821 9.81 | V Q| | | |
6+30 3.0499 9.83 | V Q| | | |
6+35 3.1193 10.08 | V Q | | |
6+40 3.1924 10.62 | V Q | | |
6+45 3.2667 10.79 | V Q | | |
6+50 3.3415 10.86 | V Q | | |
6+55 3.4166 10.90 | V Q | | |
7+ 0 3.4919 10.93 | V Q | | |
7+ 5 3.5673 10.95 | V Q | | |
7+10 3.6428 10.96 | V Q | | |
7+15 3.7182 10.96 | V Q | | |
7+20 3.7953 11.19 | V |Q | | |
7+25 3.8760 11.72 | V |Q | | |
7+30 3.9578 11.88 | V |Q | | |
7+35 4.0417 12.18 | V | Q | | |
7+40 4.1296 12.76 | V | Q | | |
7+45 4.2188 12.95 | V | Q | | |
7+50 4.3101 13.27 | V | Q | | |
7+55 4.4056 13.85 | V | Q | | |
8+ 0 4.5023 14.05 | V | Q | | |
8+ 5 4.6028 14.59 | V | Q | | |
8+10 4.7110 15.71 | V | Q | | |
8+15 4.8216 16.06 | V | Q | | |
8+20 4.9334 16.23 | V | Q | | |
8+25 5.0458 16.33 | V | Q | | |
8+30 5.1586 16.38 | V| Q | | |
8+35 5.2732 16.64 | V| Q | | |
8+40 5.3917 17.20 | V| Q | | |
8+45 5.5112 17.36 | V| Q | | |
8+50 5.6329 17.66 | V| Q | | |
8+55 5.7585 18.24 | V Q | | |
9+ 0 5.8854 18.43 | V Q | | |
9+ 5 6.0161 18.97 | V Q | | |
9+10 6.1545 20.09 | V Q | |
9+15 6.2953 20.45 | |V Q | |
9+20 6.4388 20.84 | |V Q | |
9+25 6.5867 21.47 | |V |Q | |
9+30 6.7361 21.69 | |V |Q | |
9+35 6.8877 22.02 | | V | Q | |
9+40 7.0435 22.62 | | V | Q | |
9+45 7.2006 22.81 | | V | Q | |
9+50 7.3599 23.13 | | V | Q | |
9+55 7.5233 23.72 | | V | Q | |
10+ 0 7.6879 23.91 | | V | Q | |
10+ 5 7.8423 22.42 | | V | Q | |
10+10 7.9714 18.74 | | V Q | | |

Page 7 ends

F.1.k
Packet Pg. 1910 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
10+15 8.0927 17.62 | | V Q | | |
10+20 8.2105 17.11 | | V Q | | |
10+25 8.3265 16.83 | | V Q | | |
10+30 8.4411 16.64 | | V Q | | |
10+35 8.5627 17.66 | | V Q | | |
10+40 8.7021 20.24 | | V Q | |
10+45 8.8471 21.06 | | V |Q | |
10+50 8.9947 21.43 | | V |Q | |
10+55 9.1437 21.64 | | V |Q | |
11+ 0 9.2937 21.77 | | V |Q | |
11+ 5 9.4426 21.63 | | V |Q | |
11+10 9.5883 21.16 | | V |Q | |
11+15 9.7329 21.00 | | V Q | |
11+20 9.8770 20.92 | | V Q | |
11+25 10.0208 20.88 | | V Q | |
11+30 10.1644 20.85 | | V Q | |
11+35 10.3048 20.38 | | V Q | |
11+40 10.4378 19.30 | | VQ| | |
11+45 10.5684 18.98 | | Q | | |
11+50 10.6997 19.05 | | VQ| | |
11+55 10.8340 19.50 | | Q| | |
12+ 0 10.9690 19.61 | | Q| | |
12+ 5 11.1153 21.24 | | V|Q | |
12+10 11.2874 24.99 | | V| Q | |
12+15 11.4676 26.16 | | V Q | |
12+20 11.6530 26.93 | | V Q | |
12+25 11.8442 27.77 | | V Q | |
12+30 12.0379 28.12 | | |V Q | |
12+35 12.2359 28.76 | | |V Q | |
12+40 12.4422 29.96 | | |V Q| |
12+45 12.6510 30.31 | | | V Q |
12+50 12.8625 30.71 | | | V Q |
12+55 13.0785 31.36 | | | V |Q |
13+ 0 13.2960 31.59 | | | V |Q |
13+ 5 13.5231 32.97 | | | V | Q |
13+10 13.7712 36.02 | | | V | Q |
13+15 14.0258 36.98 | | | V | Q |
13+20 14.2836 37.42 | | | V | Q |
13+25 14.5431 37.69 | | | V | Q |
13+30 14.8038 37.85 | | | V | Q |
13+35 15.0470 35.31 | | | V | Q |
13+40 15.2477 29.14 | | | V Q| |
13+45 15.4352 27.22 | | | Q | |
13+50 15.6166 26.35 | | | QV | |
13+55 15.7948 25.86 | | | Q V | |
14+ 0 15.9707 25.55 | | | Q V | |
14+ 5 16.1517 26.27 | | | Q V | |
14+10 16.3464 28.28 | | | Q | |
14+15 16.5458 28.95 | | | QV| |
14+20 16.7457 29.02 | | | Q| |
14+25 16.9428 28.62 | | | QV| |
14+30 17.1395 28.56 | | | Q V |
14+35 17.3361 28.55 | | | Q V |
14+40 17.5329 28.57 | | | Q V |
14+45 17.7296 28.56 | | | Q |V |
14+50 17.9246 28.32 | | | Q |V |
14+55 18.1157 27.75 | | | Q |V |
15+ 0 18.3056 27.58 | | | Q | V |
15+ 5 18.4934 27.27 | | | Q | V |
15+10 18.6773 26.70 | | | Q | V |
15+15 18.8599 26.51 | | | Q | V |
15+20 19.0402 26.19 | | | Q | V |
15+25 19.2165 25.60 | | | Q | V |
15+30 19.3915 25.41 | | | Q | V |
15+35 19.5596 24.41 | | | Q | V |
15+40 19.7127 22.22 | | | Q | V |
15+45 19.8611 21.54 | | |Q | V |
15+50 20.0073 21.23 | | |Q | V |
15+55 20.1522 21.05 | | |Q | V |
16+ 0 20.2964 20.94 | | Q | V |
16+ 5 20.4169 17.49 | | Q | | V |
16+10 20.4818 9.43 | Q| | | V |
16+15 20.5298 6.97 | Q | | | V |
16+20 20.5701 5.85 | Q | | | V |
16+25 20.6061 5.22 | Q | | | V |
16+30 20.6393 4.82 | Q | | | V |
16+35 20.6693 4.36 | Q | | | V |

Page 8 ends

F.1.k
Packet Pg. 1911 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
16+40 20.6942 3.62 | Q | | | V |
16+45 20.7181 3.46 | Q | | | V |
16+50 20.7414 3.39 | Q | | | V |
16+55 20.7644 3.34 | Q | | | V |
17+ 0 20.7873 3.32 | Q | | | V |
17+ 5 20.8131 3.75 | Q | | | V |
17+10 20.8462 4.81 | Q | | | V |
17+15 20.8816 5.13 | Q | | | V |
17+20 20.9180 5.28 | Q | | | V |
17+25 20.9549 5.37 | Q | | | V |
17+30 20.9923 5.42 | Q | | | V |
17+35 21.0298 5.45 | Q | | | V |
17+40 21.0676 5.48 | Q | | | V |
17+45 21.1053 5.48 | Q | | | V |
17+50 21.1415 5.25 | Q | | | V |
17+55 21.1740 4.72 | Q | | | V |
18+ 0 21.2054 4.56 | Q | | | V |
18+ 5 21.2362 4.48 | Q | | | V |
18+10 21.2668 4.44 | Q | | | V |
18+15 21.2972 4.41 | Q | | | V |
18+20 21.3275 4.40 | Q | | | V |
18+25 21.3577 4.38 | Q | | | V |
18+30 21.3879 4.38 | Q | | | V |
18+35 21.4165 4.16 | Q | | | V |
18+40 21.4415 3.62 | Q | | | V |
18+45 21.4653 3.46 | Q | | | V |
18+50 21.4871 3.16 | Q | | | V |
18+55 21.5049 2.58 | Q | | | V |
19+ 0 21.5213 2.39 | Q | | | V |
19+ 5 21.5388 2.53 | Q | | | V |
19+10 21.5595 3.01 | Q | | | V |
19+15 21.5811 3.14 | Q | | | V |
19+20 21.6047 3.43 | Q | | | V |
19+25 21.6322 3.99 | Q | | | V |
19+30 21.6610 4.18 | Q | | | V |
19+35 21.6889 4.05 | Q | | | V |
19+40 21.7135 3.57 | Q | | | V |
19+45 21.7371 3.43 | Q | | | V |
19+50 21.7588 3.15 | Q | | | V |
19+55 21.7766 2.58 | Q | | | V |
20+ 0 21.7931 2.39 | Q | | | V |
20+ 5 21.8105 2.53 | Q | | | V |
20+10 21.8312 3.01 | Q | | | V |
20+15 21.8528 3.14 | Q | | | V |
20+20 21.8749 3.20 | Q | | | V |
20+25 21.8972 3.23 | Q | | | V |
20+30 21.9196 3.26 | Q | | | V |
20+35 21.9422 3.27 | Q | | | V |
20+40 21.9648 3.29 | Q | | | V |
20+45 21.9874 3.29 | Q | | | V |
20+50 22.0085 3.06 | Q | | | V |
20+55 22.0259 2.53 | Q | | | V |
21+ 0 22.0422 2.36 | Q | | | V |
21+ 5 22.0596 2.52 | Q | | | V |
21+10 22.0803 3.01 | Q | | | V |
21+15 22.1019 3.14 | Q | | | V |
21+20 22.1224 2.98 | Q | | | V|
21+25 22.1395 2.47 | Q | | | V|
21+30 22.1555 2.33 | Q | | | V|
21+35 22.1728 2.50 | Q | | | V|
21+40 22.1935 3.01 | Q | | | V|
21+45 22.2151 3.14 | Q | | | V|
21+50 22.2356 2.98 | Q | | | V|
21+55 22.2527 2.47 | Q | | | V|
22+ 0 22.2688 2.33 | Q | | | V|
22+ 5 22.2860 2.50 | Q | | | V|
22+10 22.3067 3.01 | Q | | | V|
22+15 22.3284 3.14 | Q | | | V|
22+20 22.3489 2.98 | Q | | | V|
22+25 22.3659 2.47 | Q | | | V|
22+30 22.3820 2.33 | Q | | | V|
22+35 22.3976 2.28 | Q | | | V|
22+40 22.4131 2.25 | Q | | | V|
22+45 22.4284 2.22 | Q | | | V|
22+50 22.4436 2.21 | Q | | | V|
22+55 22.4587 2.19 | Q | | | V|
23+ 0 22.4738 2.19 | Q | | | V|

Page 9 ends

F.1.k
Packet Pg. 1912 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 3828PR10024100
23+ 5 22.4889 2.19 | Q | | | V|
23+10 22.5040 2.19 | Q | | | V|
23+15 22.5191 2.19 | Q | | | V|
23+20 22.5342 2.19 | Q | | | V|
23+25 22.5493 2.19 | Q | | | V|
23+30 22.5644 2.19 | Q | | | V|
23+35 22.5795 2.19 | Q | | | V|
23+40 22.5946 2.19 | Q | | | V|
23+45 22.6097 2.19 | Q | | | V|
23+50 22.6248 2.19 | Q | | | V|
23+55 22.6399 2.19 | Q | | | V|
24+ 0 22.6549 2.19 | Q | | | V|
24+ 5 22.6669 1.74 |Q | | | V|
24+10 22.6716 0.67 Q | | | V|
24+15 22.6739 0.34 Q | | | V|
24+20 22.6753 0.20 Q | | | V|
24+25 22.6761 0.11 Q | | | V|
24+30 22.6765 0.06 Q | | | V|
24+35 22.6766 0.03 Q | | | V|
-----------------------------------------------------------------------

Page 10 ends

F.1.k
Packet Pg. 1913 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.k
Packet Pg. 1914 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.k
Packet Pg. 1915 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley Trade Center/Park) F.1.k
Packet Pg. 1916 Attachment: Preliminary Hydrology Report (High Cube) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley Trade Center/Park) Thienes Engineering, Inc.

CIVIL ENGINEERING  LAND SURVEYING

PRELIMINARY HYDROLOGY CALCULATIONS
FOR

MORENO VALLEY TRADE CENTER
OPTION 2-E COMMERCE/FULFILLMENT CENTER SITE PLAN
EUCALYPTUS AVENUE AND REDLANDS BLVD.

MORENO VALLEY, CALIFORNIA

PREPARED FOR

HILWOOD INVESTMENTS
901 VIA PIEMONTE, STE 1775
ONTARIO, CA 91764
PH. (949) 382-0033
APRIL 5, 2022
JOB NO. 3828

PREPARED BY

THIENES ENGINEERING
14349 FIRESTONE BOULEVARD
LA MIRADA, CALIFORNIA 90638
PHONE: (714) 521-4811
FAX: (714) 521-4173

F.1.l
Packet Pg. 1917 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley

HYDROLOGY AND HYDRAULIC

CALCULATIONS

FOR

MORENO VALLEY TRADE CENTER

PREPARED

UNDER THE SUPERVISION OF

____________________________________
REINHARD STENZEL DATE:

R.C.E. 56155
EXP. : 12/31/22

F.1.l
Packet Pg. 1918 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley

TABLE OF CONTENTS
INTRODUCTION ....................................................................................................................................... 1 VICINITY MAP.......................................................................................................................................... 2 MASTER DRAINAGE PLAN ................................................................................................................... 3 EXISTING CONDITION .......................................................................................................................... 4 PROPOSED CONDITION HYDROLOGY ............................................................................................ 4 DETENTION .............................................................................................................................................. 6 METHODOLOGY .................................................................................................................................... 7 SUMMARY ................................................................................................................................................ 7 F.1.l
Packet Pg. 1919 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 1 INTRODUCTION
A: PROJECT LOCATION
The project site is located at southwest corner of Eucalyptus Avenue and Redlands Boulevard in the City of Moreno Valley. Encelia Avenue is adjacent to the southerly property line. Please see the next page for vicinity map.

B: STUDY PURPOSE
The purpose of this study is to determine the existing and proposed condition peak flow rates for various storm events for the site. Discharge from the project site ultimately drains to an existing storm drain in Redlands Boulevard.

C: PROJECT STAFF:

Thienes Engineering staff involved in this study include:

Reinhard Stenzel
Kristie Ferronato
Brian Weil
F.1.l
Packet Pg. 1920 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1921
Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised 3 DISCUSSION

The project site encompasses approximately 72.73 acres. However, several acres along the westerly property line are within an existing drainage channel (Quincy Wash) and will not be disturbed. Here, sheet piles will be constructed within the property site to protect the site from the Wash. Proposed improvements include one warehouse type building with approximately 1,328,853 square feet. There are truck yard areas on the northerly and southerly sides of the building. Vehicle parking is primarily on the easterly side of the property with some additional parking areas along the westerly drive aisle. There is a water quality/detention basin located along the southerly side of the side adjacent to Encelia Avenue. Additional landscaped areas are located adjacent to the streets and smaller areas throughout the project site.

Master Drainage Plan
The project site is tabled to a storm drain system in Redlands Boulevard (Moreno MDP Line F-2). At this time, only portions of the Master Plan Storm Drain system are constructed. Recent improvements to the north of the project site (Aldi Foods) constructed a portion of the ultimate storm drain in Redlands Boulevard. This is a 60”-72” storm drain (plans prepared by Huitt-Zollars) that connects to an existing 51” storm drain in Redlands Boulevard approximately 200’ north of Eucalyptus Avenue and continues approximately 350’ south of Eucalyptus Avenue to where it daylights into an existing unimproved earthen channel. This storm drain and channel is located at the easterly portion of the project site.

Runoff continues southerly in the unimproved earthen channel to an existing headwall located northerly of Dracaea Avenue. This is the upstream portion of Riverside County Flood Control and Water Conservation District storm drain Line “F-2”. This is an existing 42” storm drain system that does not appear to be adequately sized for the peak flow rates specified in the recently constructed upstream storm drain system. The existing storm drain continues southerly past Brodiaea Avenue and discharges into an existing earthen channel (Line “F”).

The Master Drainage Plan indicates a storm drain system in Eucalyptus Avenue (Lateral F-16). The necessary portions of this storm drain system was constructed with the Aldi Foods development to the north. In a memo dated December 23, 2020, Riverside County Flood Control and Water Conservation District (R.C.F.C.&W.C.D.) acknowledges that the “existing facility is functionally equivalent to Line F-16, and the remaining unconstructed portion is not necessary to provide flood protection.” See Appendix “A” for a copy of this memo.

The Master Drainage Plan also indicates a storm drain system in Encelia Avenue (Lateral F-17) ranging from 42” to 60”. The development of the project site will utilize a detention basin and onsite storm drain systems that will greatly reduce flow to Encelia Avenue such that only a shorter and smaller storm drain will be necessary in the street. In the same memo, R.C.F.C.&W.C.D. states “Since these facilities together collect and convey the F.1.l
Packet Pg. 1922 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 4 same area that was tabled to Line F-17, it is our opinion that the existing facility is functionally equivalent to Line F-17”.

See Appendix “A” for reference existing storm drain plans and a portion of the Master Drainage Plan.

Existing Condition
The project site is generally a vacant lot with natural grasses and weeds. The southeasterly portion of the site is an existing plant nursery. The nursery has a few small structures and appears unpaved. The westerly portion of the property is an unimproved drainage channel (Quincy Wash) and is not tributary to the project site.

Runoff from the site generally drains from north to south to Encelia Avenue at several locations (nodes 103, 105, 106, and 107 on existing condition hydrology map). Encelia Avenue drains from west to east to Redlands Boulevard ultimately to the existing channel adjacent to Redlands Boulevard.

Runoff from Redlands Boulevard flows southerly towards the intersection with Encilia Avenue and node 107. The 100-year Rational Method peak flow rate from the project site and adjacent streets approximately 108.4 cfs.

Runoff in Eucalyptus flows west to east and is intercepted by several riser inlet structures (nodes 112, 121, and 131). The respective 100-year Rational Method flow rates to each risers are approximately 4.2 cfs, 1.6 cfs, and 0.90 cfs.

See Appendix “B” for existing condition Rational Method calculations and Appendix “D” for existing condition hydrology map.

Existing condition hydrographs were established for various storm events. These peak flow rates and volumes are summarized below in the Detention discussion.

Proposed Condition Hydrology
Runoff from the northerly portion of the building, northerly truckyard and easterly parking lots (Nodes 100-115) will be captured in a proposed onsite storm drain system and conveyed southerly to an underground CMP detention system. Runoff from the southerly and westerly portions of the site (Nodes 200-219) will be conveyed to the southerly truck yard and confluenced with the runoff from the north.

Runoff from the detention basin in the southeasterly corner of the site (Node 220) will be confluenced in the proposed system and conveyed easterly. The 100-year peak flow rate from the project site is approximately 154.7 cfs.

F.1.l
Packet Pg. 1923 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 5 Discharge from the basin will be conveyed easterly through the project site in a proposed storm drain and connect to the proposed extension of the public storm drain system in Redlands Boulevard. This will eliminate runoff to Encelia Avenue as well as the need for Master Drainage Plan Lateral “F-17”, as previously mentioned in R.C.F.C.&W.C.D. memo dated December 23, 2020. The proposed public storm drain will be sized to include the ultimate peak flow rates upstream as well as the discharge from the detention basin. Final design will dictate exact pipe sizes. The public storm drain will continue south in place of the open earth channel to the existing 42” storm drain near Dracaea Avenue. The existing headwall will be removed and the proposed drain will connect to the existing system.

The existing 42” downstream storm drain system does not have the same capacity as the proposed 78” storm drain system. To avoid overburdening the existing 42” storm drain, a relief system will be designed to ensure that flow not allowed into the existing facility can discharge to the street. This will emulate existing conditions where runoff that is not currently allowed into the storm drain (via existing headwall adjacent to the Redlands Avenue) can then drain to the street. Regardless of how the storm drain systems connect, runoff exceeding the capacity of the 42” storm drain system remains on westerly surface of Redlands Avenue. The final design shall be to the satisfaction of the City Manager or City Engineer.

The landscaped areas adjacent to Encelia Avenue will sheet flow to the street and join the street runoff flowing easterly towards the intersection with Redlands Boulevard (nodes 600-604). The runoff will be intercepted by a catch basin in Encilia Avenue and will enter the proposed public storm drain in Redlands Boulevard. The 100-year Rational Method peak runoff from these areas is approximately 7.1 cfs. With the proposed onsite improvements, this is the only drainage system required in Encilia Avenue.

The landscaped frontage along Eucalyptus Avenue will also drain to the street. Catch Basins at nodes 502 and 511 will intercept street and landscape runoff and convey it to the existing 54” storm drain in Eucalyptus Avenue. The 100-year Rational Method peak runoff to these nodes will be approximately 4.4 cfs and 2.8 cfs respectively.

Runoff from Redlands Boulevard and the adjacent project frontage will flow southerly within Redlands Boulevard to a catch basin near the intersection with Encilia Avenue (nodes 520-522). The 100-year Rational Method peak runoff to node 522 will be approximately 4.9 cfs.

Approximately 2.50 acres of area adjacent to the Quincy Wash at the westerly portion of the site will remain undisturbed. The landscaped frontage along Redlands Boulevard will produce a similar amount of runoff as the existing condition and will drain directly to the street.

See Appendix “B” for proposed condition hydrology calculations and Appendix “D” for proposed condition hydrology map.

F.1.l
Packet Pg. 1924 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 6 Detention
Since downstream facilities do not appear to have capacity for the increase in peak flow and volume from the proposed commercial project, detention will be required to limit runoff to no more than that under existing conditions. Detention analysis is considered for the 2-, 5-, 10- and 100-year storm events. Riverside County allows “preliminary sizing of increased runoff basin may be based on the difference in volume between the developed condition and the pre-developed condition for the 24-hour duration event for the 10-year return frequency.”
1-, 3-, 6-, and 24-hour hydrographs were established for all areas tributary to the detention basin for the 2-, 5-, 10- and 100-year events for both existing (undeveloped) and proposed conditions. For existing conditions, the land use is considered “open brush, poor cover”.

Proposed conditions assume all commercial development. Rainfall values are taken from the Riverside County Hydrology Manual. For the 2- and 5-year events, the loss rate is determined using an AMC I condition. For the 10-year event, AMC II was used and for the 100-year event AMC III was used.

Note that not all area of the project site drains to the detention basin, thus the areas used for the detention analysis are slightly smaller than the total project site. Areas not tributary to the detention basin are the areas to the west and south of the site. It is assumed that the landscaped areas produce about the same runoff rates and volumes as the undeveloped site.

The following table summarizes existing and proposed condition peak flow rates and volumes associated with the area to the detention basin. From the table, the largest difference in volume is approximately 12.25 acre-feet (10-year 24-hour event). The largest difference in peak flow rate is about 46.3 cfs (5-year 1-hour event). For preliminary sizing, the detention basin will be sized to detain the largest difference in volume. The preliminary underground CMP system will be sized to match this volume. The southeasterly basin meets the surface area and volume requirements necessary for water quality purposes per separate Water Quality Management Plan.

Final design will dictate the outlet features that will limit runoff from all of the above events to less than existing conditions. The landscaped areas tributary to the street would yield peak flow rates similar to existing condition and are not included in the hydrographs.

See Appendix “C” for existing and proposed condition hydrographs.

The following table summarizes existing and proposed condition hydrographs:

BASIN SUMMARY TABLE

Return Storm Existing Total Proposed Total Peak Flow Volume Event Duration Flow Volume Flow Volume Difference Difference (year) (hour) (cfs) (ac-ft) (cfs) (ac-ft) (cfs) (ac-ft) 100 1 131.5 5.89 177.0 6.38 45.5 0.49
F.1.l
Packet Pg. 1925 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 7 100 3 88.3 7.96 103.5 9.62 15.2 1.66
100 6 77.8 9.16 89.8 12.81 12.0 3.65
100 24 31.9 12.27 37.9 22.68 6.0 10.41
10 1 73.5 2.78 113.0 4.06 39.5 1.28
10 3 45.5 2.67 65.2 6.24 19.7 3.57
10 6 40.1 2.93 57.8 8.59 17.7 5.66
10 24 8.8 2.25 23.8 14.50 15.0 12.25
5 1 47.0 1.38 93.3 3.38 46.3 2.00
5 3 23.8 1.20 54.5 5.27 30.7 4.07
5 6 19.9 1.31 49.5 7.38 29.6 6.07
5 24 2.2 1.34 19.7 12.05 17.5 10.71
2 1 29.8 0.87 69.2 2.53 39.4 1.66
2 3 12.1 0.67 41.6 4.02 29.5 3.35
2 6 10.1 0.80 38.8 5.79 28.7 4.99
2 24 1.6 0.98 14.4 8.81 12.8 7.83
Methodology
Hydrology calculations were computed using Riverside County Rational Method program (by AES software). Hydrograph were computed using CIVILD software. The soil type is “B” per Riverside County Hydrology Manual. See Appendix “A” for reference material from the Riverside County Hydrology Manual.

F.1.l
Packet Pg. 1926 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1927 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1928 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1929 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1930 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1931 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1932 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1933 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1934 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1935 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1936 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1937 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1938 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1939 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1940 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1941 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1942 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1943 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1944 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1945 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1946 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1947 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 100XX
____________________________________________________________________________ ****************************************************************************

RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON

RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright 1982-2016 Advanced Engineering Software (aes) (Rational Tabling Version 23.0)
Release Date: 07/01/2016 License ID 1435
Analysis prepared by:

THIENES ENGINEERING, INC.
14349 FIRESTONE BLVD
LA MIRADA, CA 90638
714-521-4811
************************** DESCRIPTION OF STUDY ************************** * TEI JOB 3828 *
* 100-YEAR STORM EVENT *
* EXISTING CONDITION (NODES 100-107) *
************************************************************************** FILE NAME: W:\3828\100XX.DAT
TIME/DATE OF STUDY: 08:36 03/25/2021
---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
---------------------------------------------------------------------------- USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.010
10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 0.820
100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.940
100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.200
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.5003939
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.5001161
COMPUTED RAINFALL INTENSITY DATA:

STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.200 SLOPE OF INTENSITY DURATION CURVE = 0.5001
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: CONSIDER ALL CONFLUENCE STREAM COMBINATIONS

FOR ALL DOWNSTREAM ANALYSES
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING

WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:

1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)

2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
**************************************************************************** FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================

ASSUMED INITIAL SUBAREA UNIFORM
DEVELOPMENT IS: UNDEVELOPED WITH POOR COVER
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH(FEET) = 410.00
UPSTREAM ELEVATION(FEET) = 1752.00
DOWNSTREAM ELEVATION(FEET) = 1741.50
ELEVATION DIFFERENCE(FEET) = 10.50
TC = 0.533*[( 410.00**3)/( 10.50)]**.2 = 12.298
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.651
UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .6451
SOIL CLASSIFICATION IS "B"
SUBAREA RUNOFF(CFS) = 4.87
TOTAL AREA(ACRES) = 2.85 TOTAL RUNOFF(CFS) = 4.87
**************************************************************************** FLOW PROCESS FROM NODE 101.00 TO NODE 102.00 IS CODE = 51

Page 1 ends

F.1.l
Packet Pg. 1948 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 100XX
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1741.50 DOWNSTREAM(FEET) = 1732.00 CHANNEL LENGTH THRU SUBAREA(FEET) = 400.00 CHANNEL SLOPE = 0.0237 CHANNEL BASE(FEET) = 100.00 "Z" FACTOR = 99.990
MANNING'S FACTOR = 0.030 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.186
UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .6085
SOIL CLASSIFICATION IS "B"
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 7.84
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 1.15 AVERAGE FLOW DEPTH(FEET) = 0.06 TRAVEL TIME(MIN.) = 5.78 Tc(MIN.) = 18.08
SUBAREA AREA(ACRES) = 4.40 SUBAREA RUNOFF(CFS) = 5.85
TOTAL AREA(ACRES) = 7.2 PEAK FLOW RATE(CFS) = 10.73
END OF SUBAREA CHANNEL FLOW HYDRAULICS:

DEPTH(FEET) = 0.07 FLOW VELOCITY(FEET/SEC.) = 1.36
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 102.00 = 810.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 102.00 TO NODE 103.00 IS CODE = 51 ---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1732.00 DOWNSTREAM(FEET) = 1722.60 CHANNEL LENGTH THRU SUBAREA(FEET) = 410.00 CHANNEL SLOPE = 0.0229 CHANNEL BASE(FEET) = 100.00 "Z" FACTOR = 99.900
MANNING'S FACTOR = 0.030 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.957
UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .5862
SOIL CLASSIFICATION IS "B"
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 16.05
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 1.52 AVERAGE FLOW DEPTH(FEET) = 0.10 TRAVEL TIME(MIN.) = 4.50 Tc(MIN.) = 22.57
SUBAREA AREA(ACRES) = 9.25 SUBAREA RUNOFF(CFS) = 10.61
TOTAL AREA(ACRES) = 16.5 PEAK FLOW RATE(CFS) = 21.34
END OF SUBAREA CHANNEL FLOW HYDRAULICS:

DEPTH(FEET) = 0.12 FLOW VELOCITY(FEET/SEC.) = 1.63
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 103.00 = 1220.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 103.00 TO NODE 104.00 IS CODE = 61 ---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>(STANDARD CURB SECTION USED)<<<<<
============================================================================ UPSTREAM ELEVATION(FEET) = 1723.00 DOWNSTREAM ELEVATION(FEET) = 1722.00 STREET LENGTH(FEET) = 275.00 CURB HEIGHT(INCHES) = 8.0
STREET HALFWIDTH(FEET) = 32.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 16.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020
OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0149 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 21.87 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:

NOTE: STREET FLOW EXCEEDS TOP OF CURB.

THE FOLLOWING STREET FLOW RESULTS ARE BASED ON THE ASSUMPTION THAT NEGLIBLE FLOW OCCURS OUTSIDE OF THE STREET CHANNEL.

THAT IS, ALL FLOW ALONG THE PARKWAY, ETC., IS NEGLECTED.

STREET FLOW DEPTH(FEET) = 0.73
HALFSTREET FLOOD WIDTH(FEET) = 28.63
AVERAGE FLOW VELOCITY(FEET/SEC.) = 2.61
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 1.91
STREET FLOW TRAVEL TIME(MIN.) = 1.76 Tc(MIN.) = 24.33
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.885
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8678
SOIL CLASSIFICATION IS "B"

Page 2 ends

F.1.l
Packet Pg. 1949 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 100XX
SUBAREA AREA(ACRES) = 0.65 SUBAREA RUNOFF(CFS) = 1.06
TOTAL AREA(ACRES) = 17.1 PEAK FLOW RATE(CFS) = 22.40
END OF SUBAREA STREET FLOW HYDRAULICS:

DEPTH(FEET) = 0.74 HALFSTREET FLOOD WIDTH(FEET) = 28.87 FLOW VELOCITY(FEET/SEC.) = 2.63 DEPTH*VELOCITY(FT*FT/SEC.) = 1.93 LONGEST FLOWPATH FROM NODE 100.00 TO NODE 104.00 = 1495.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 104.00 TO NODE 105.00 IS CODE = 61 ---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>(STANDARD CURB SECTION USED)<<<<<
============================================================================ UPSTREAM ELEVATION(FEET) = 1722.00 DOWNSTREAM ELEVATION(FEET) = 1715.80 STREET LENGTH(FEET) = 755.00 CURB HEIGHT(INCHES) = 8.0
STREET HALFWIDTH(FEET) = 32.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 16.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020
OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0149 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 22.93 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:

STREET FLOW DEPTH(FEET) = 0.66
HALFSTREET FLOOD WIDTH(FEET) = 24.94
AVERAGE FLOW VELOCITY(FEET/SEC.) = 3.58
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 2.35
STREET FLOW TRAVEL TIME(MIN.) = 3.52 Tc(MIN.) = 27.85
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.762
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8664
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.70 SUBAREA RUNOFF(CFS) = 1.07
TOTAL AREA(ACRES) = 17.9 PEAK FLOW RATE(CFS) = 23.47
END OF SUBAREA STREET FLOW HYDRAULICS:

DEPTH(FEET) = 0.66 HALFSTREET FLOOD WIDTH(FEET) = 25.12 FLOW VELOCITY(FEET/SEC.) = 3.61 DEPTH*VELOCITY(FT*FT/SEC.) = 2.39 LONGEST FLOWPATH FROM NODE 100.00 TO NODE 105.00 = 2250.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 105.00 TO NODE 105.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.762
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8664
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 17.25 SUBAREA RUNOFF(CFS) = 26.33 TOTAL AREA(ACRES) = 35.1 TOTAL RUNOFF(CFS) = 49.80
TC(MIN.) = 27.85
**************************************************************************** FLOW PROCESS FROM NODE 105.00 TO NODE 106.00 IS CODE = 61 ---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>(STANDARD CURB SECTION USED)<<<<<
============================================================================ UPSTREAM ELEVATION(FEET) = 1715.80 DOWNSTREAM ELEVATION(FEET) = 1709.80 STREET LENGTH(FEET) = 620.00 CURB HEIGHT(INCHES) = 8.0
STREET HALFWIDTH(FEET) = 32.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 16.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020
OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0149 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 50.24 ***STREET FLOW SPLITS OVER STREET-CROWN***
FULL DEPTH(FEET) = 0.80 FLOOD WIDTH(FEET) = 32.00
FULL HALF-STREET VELOCITY(FEET/SEC.) = 4.58
SPLIT DEPTH(FEET) = 0.35 SPLIT FLOOD WIDTH(FEET) = 9.53

Page 3 ends

F.1.l
Packet Pg. 1950 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 100XX
SPLIT FLOW(CFS) = 2.48 SPLIT VELOCITY(FEET/SEC.) = 2.26 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:

NOTE: STREET FLOW EXCEEDS TOP OF CURB.

THE FOLLOWING STREET FLOW RESULTS ARE BASED ON THE ASSUMPTION THAT NEGLIBLE FLOW OCCURS OUTSIDE OF THE STREET CHANNEL.

THAT IS, ALL FLOW ALONG THE PARKWAY, ETC., IS NEGLECTED.

STREET FLOW DEPTH(FEET) = 0.80
HALFSTREET FLOOD WIDTH(FEET) = 32.00
AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.58
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 3.65
STREET FLOW TRAVEL TIME(MIN.) = 2.26 Tc(MIN.) = 30.10
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.694
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8656
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.60 SUBAREA RUNOFF(CFS) = 0.88
TOTAL AREA(ACRES) = 35.7 PEAK FLOW RATE(CFS) = 50.68
END OF SUBAREA STREET FLOW HYDRAULICS:

DEPTH(FEET) = 0.80 HALFSTREET FLOOD WIDTH(FEET) = 32.00 FLOW VELOCITY(FEET/SEC.) = 4.58 DEPTH*VELOCITY(FT*FT/SEC.) = 3.65 LONGEST FLOWPATH FROM NODE 100.00 TO NODE 106.00 = 2870.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 106.00 TO NODE 106.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.694
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8656
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 21.50 SUBAREA RUNOFF(CFS) = 31.53 TOTAL AREA(ACRES) = 57.2 TOTAL RUNOFF(CFS) = 82.21
TC(MIN.) = 30.10
**************************************************************************** FLOW PROCESS FROM NODE 106.00 TO NODE 107.00 IS CODE = 61 ---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>(STANDARD CURB SECTION USED)<<<<<
============================================================================ UPSTREAM ELEVATION(FEET) = 1709.80 DOWNSTREAM ELEVATION(FEET) = 1706.00 STREET LENGTH(FEET) = 445.00 CURB HEIGHT(INCHES) = 8.0
STREET HALFWIDTH(FEET) = 32.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 16.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020
OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0149 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 82.64 ***STREET FLOW SPLITS OVER STREET-CROWN***
FULL DEPTH(FEET) = 0.80 FLOOD WIDTH(FEET) = 32.00
FULL HALF-STREET VELOCITY(FEET/SEC.) = 4.30
SPLIT DEPTH(FEET) = 0.76 SPLIT FLOOD WIDTH(FEET) = 29.98 SPLIT FLOW(CFS) = 37.78 SPLIT VELOCITY(FEET/SEC.) = 4.12 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:

NOTE: STREET FLOW EXCEEDS TOP OF CURB.

THE FOLLOWING STREET FLOW RESULTS ARE BASED ON THE ASSUMPTION THAT NEGLIBLE FLOW OCCURS OUTSIDE OF THE STREET CHANNEL.

THAT IS, ALL FLOW ALONG THE PARKWAY, ETC., IS NEGLECTED.

STREET FLOW DEPTH(FEET) = 0.80
HALFSTREET FLOOD WIDTH(FEET) = 32.00
AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.30
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 3.43
STREET FLOW TRAVEL TIME(MIN.) = 1.72 Tc(MIN.) = 31.83
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.648
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8650
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.60 SUBAREA RUNOFF(CFS) = 0.86
TOTAL AREA(ACRES) = 57.8 PEAK FLOW RATE(CFS) = 83.06
END OF SUBAREA STREET FLOW HYDRAULICS:

DEPTH(FEET) = 0.80 HALFSTREET FLOOD WIDTH(FEET) = 32.00 FLOW VELOCITY(FEET/SEC.) = 4.30 DEPTH*VELOCITY(FT*FT/SEC.) = 3.43 LONGEST FLOWPATH FROM NODE 100.00 TO NODE 107.00 = 3315.00 FEET.

Page 4 ends

F.1.l
Packet Pg. 1951 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 100XX
**************************************************************************** FLOW PROCESS FROM NODE 107.00 TO NODE 107.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.648
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8650
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 16.00 SUBAREA RUNOFF(CFS) = 22.80 TOTAL AREA(ACRES) = 73.8 TOTAL RUNOFF(CFS) = 105.87
TC(MIN.) = 31.83
**************************************************************************** FLOW PROCESS FROM NODE 107.00 TO NODE 107.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 1.648
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8650
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.80 SUBAREA RUNOFF(CFS) = 2.57
TOTAL AREA(ACRES) = 75.6 TOTAL RUNOFF(CFS) = 108.43
TC(MIN.) = 31.83
============================================================================ END OF STUDY SUMMARY:

TOTAL AREA(ACRES) = 75.6 TC(MIN.) = 31.83
PEAK FLOW RATE(CFS) = 108.43
============================================================================ ============================================================================

END OF RATIONAL METHOD ANALYSIS

Page 5 ends

F.1.l
Packet Pg. 1952 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 110XX
____________________________________________________________________________ ****************************************************************************

RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON

RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright 1982-2016 Advanced Engineering Software (aes) (Rational Tabling Version 23.0)
Release Date: 07/01/2016 License ID 1435
Analysis prepared by:

THIENES ENGINEERING, INC.
14349 FIRESTONE BLVD
LA MIRADA, CA 90638
714-521-4811
************************** DESCRIPTION OF STUDY ************************** * TEI JOB 3828 *
* 100-YEAR STORM EVENT *
* EXISTING CONDITION (NODES 110-112) *
************************************************************************** FILE NAME: W:\3828\110XX.DAT
TIME/DATE OF STUDY: 09:40 03/25/2021
---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
---------------------------------------------------------------------------- USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.010
10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 0.820
100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.940
100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.200
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.5003939
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.5001161
COMPUTED RAINFALL INTENSITY DATA:

STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.200 SLOPE OF INTENSITY DURATION CURVE = 0.5001
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: CONSIDER ALL CONFLUENCE STREAM COMBINATIONS

FOR ALL DOWNSTREAM ANALYSES
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING

WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:

1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)

2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
**************************************************************************** FLOW PROCESS FROM NODE 110.00 TO NODE 111.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================

ASSUMED INITIAL SUBAREA UNIFORM

DEVELOPMENT IS COMMERCIAL
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH(FEET) = 875.00
UPSTREAM ELEVATION(FEET) = 1755.15
DOWNSTREAM ELEVATION(FEET) = 1747.00
ELEVATION DIFFERENCE(FEET) = 8.15
TC = 0.303*[( 875.00**3)/( 8.15)]**.2 = 11.603
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.729
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8750
SOIL CLASSIFICATION IS "B"
SUBAREA RUNOFF(CFS) = 2.39
TOTAL AREA(ACRES) = 1.00 TOTAL RUNOFF(CFS) = 2.39
**************************************************************************** FLOW PROCESS FROM NODE 111.00 TO NODE 112.00 IS CODE = 61

Page 1 ends

F.1.l
Packet Pg. 1953 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 110XX
---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>(STANDARD CURB SECTION USED)<<<<<
============================================================================ UPSTREAM ELEVATION(FEET) = 1747.00 DOWNSTREAM ELEVATION(FEET) = 1737.88 STREET LENGTH(FEET) = 875.00 CURB HEIGHT(INCHES) = 8.0
STREET HALFWIDTH(FEET) = 38.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 19.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020
OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0149 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 3.31 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:

STREET FLOW DEPTH(FEET) = 0.37
HALFSTREET FLOOD WIDTH(FEET) = 10.68
AVERAGE FLOW VELOCITY(FEET/SEC.) = 2.49
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 0.92
STREET FLOW TRAVEL TIME(MIN.) = 5.86 Tc(MIN.) = 17.47
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.224
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8712
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.95 SUBAREA RUNOFF(CFS) = 1.84
TOTAL AREA(ACRES) = 2.0 PEAK FLOW RATE(CFS) = 4.23
END OF SUBAREA STREET FLOW HYDRAULICS:

DEPTH(FEET) = 0.40 HALFSTREET FLOOD WIDTH(FEET) = 11.95 FLOW VELOCITY(FEET/SEC.) = 2.61 DEPTH*VELOCITY(FT*FT/SEC.) = 1.04 LONGEST FLOWPATH FROM NODE 110.00 TO NODE 112.00 = 1750.00 FEET. ============================================================================ END OF STUDY SUMMARY:

TOTAL AREA(ACRES) = 2.0 TC(MIN.) = 17.47
PEAK FLOW RATE(CFS) = 4.23
============================================================================ ============================================================================

END OF RATIONAL METHOD ANALYSIS

Page 2 ends

F.1.l
Packet Pg. 1954 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 120XX
____________________________________________________________________________ ****************************************************************************

RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON

RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright 1982-2016 Advanced Engineering Software (aes) (Rational Tabling Version 23.0)
Release Date: 07/01/2016 License ID 1435
Analysis prepared by:

THIENES ENGINEERING, INC.
14349 FIRESTONE BLVD
LA MIRADA, CA 90638
714-521-4811
************************** DESCRIPTION OF STUDY ************************** * TEI JOB 3828 *
* 100-YEAR STORM EVENT *
* EXISTING CONDITION (NODES 120-121) *
************************************************************************** FILE NAME: W:\3828\120XX.DAT
TIME/DATE OF STUDY: 10:39 03/25/2021
---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
---------------------------------------------------------------------------- USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.010
10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 0.820
100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.940
100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.200
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.5003939
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.5001161
COMPUTED RAINFALL INTENSITY DATA:

STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.200 SLOPE OF INTENSITY DURATION CURVE = 0.5001
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: CONSIDER ALL CONFLUENCE STREAM COMBINATIONS

FOR ALL DOWNSTREAM ANALYSES
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING

WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:

1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)

2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
**************************************************************************** FLOW PROCESS FROM NODE 120.00 TO NODE 121.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================

ASSUMED INITIAL SUBAREA UNIFORM

DEVELOPMENT IS COMMERCIAL
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH(FEET) = 390.00
UPSTREAM ELEVATION(FEET) = 1740.00
DOWNSTREAM ELEVATION(FEET) = 1734.82
ELEVATION DIFFERENCE(FEET) = 5.18
TC = 0.303*[( 390.00**3)/( 5.18)]**.2 = 7.823
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.324
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8784
SOIL CLASSIFICATION IS "B"
SUBAREA RUNOFF(CFS) = 1.61
TOTAL AREA(ACRES) = 0.55 TOTAL RUNOFF(CFS) = 1.61
============================================================================ END OF STUDY SUMMARY:

TOTAL AREA(ACRES) = 0.6 TC(MIN.) = 7.82

Page 1 ends

F.1.l
Packet Pg. 1955 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 120XX
PEAK FLOW RATE(CFS) = 1.61
============================================================================ ============================================================================

END OF RATIONAL METHOD ANALYSIS

Page 2 ends

F.1.l
Packet Pg. 1956 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 130XX
____________________________________________________________________________ ****************************************************************************

RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON

RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright 1982-2016 Advanced Engineering Software (aes) (Rational Tabling Version 23.0)
Release Date: 07/01/2016 License ID 1435
Analysis prepared by:

THIENES ENGINEERING, INC.
14349 FIRESTONE BLVD
LA MIRADA, CA 90638
714-521-4811
************************** DESCRIPTION OF STUDY ************************** * TEI JOB 3828 *
* 100-YEAR STORM EVENT *
* EXISTING CONDITION (NODES 130-131) *
************************************************************************** FILE NAME: W:\3828\130XX.DAT
TIME/DATE OF STUDY: 11:50 03/25/2021
---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
---------------------------------------------------------------------------- USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.010
10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 0.820
100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.940
100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.200
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.5003939
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.5001161
COMPUTED RAINFALL INTENSITY DATA:

STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.200 SLOPE OF INTENSITY DURATION CURVE = 0.5001
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: CONSIDER ALL CONFLUENCE STREAM COMBINATIONS

FOR ALL DOWNSTREAM ANALYSES
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING

WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:

1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)

2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
**************************************************************************** FLOW PROCESS FROM NODE 130.00 TO NODE 131.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================

ASSUMED INITIAL SUBAREA UNIFORM

DEVELOPMENT IS COMMERCIAL
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH(FEET) = 175.00
UPSTREAM ELEVATION(FEET) = 1737.80
DOWNSTREAM ELEVATION(FEET) = 1734.83
ELEVATION DIFFERENCE(FEET) = 2.97
TC = 0.303*[( 175.00**3)/( 2.97)]**.2 = 5.406
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.999
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8813
SOIL CLASSIFICATION IS "B"
SUBAREA RUNOFF(CFS) = 0.88
TOTAL AREA(ACRES) = 0.25 TOTAL RUNOFF(CFS) = 0.88
============================================================================ END OF STUDY SUMMARY:

TOTAL AREA(ACRES) = 0.2 TC(MIN.) = 5.41

Page 1 ends

F.1.l
Packet Pg. 1957 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 130XX
PEAK FLOW RATE(CFS) = 0.88
============================================================================ ============================================================================

END OF RATIONAL METHOD ANALYSIS

Page 2 ends

F.1.l
Packet Pg. 1958 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley F.1.l
Packet Pg. 1959 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley ____________________________________________________________________________ ****************************************************************************

RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON

RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright 1982-2016 Advanced Engineering Software (aes) (Rational Tabling Version 23.0)
Release Date: 07/01/2016 License ID 1435
Analysis prepared by:

THIENES ENGINEERING, INC.
14349 FIRESTONE BLVD
LA MIRIADA, CA 90638
714-521-4811
************************** DESCRIPTION OF STUDY ************************** * TEI JOB NUMBER 3828 *
* PROPOSED CONDITIONS *
* 100-YEAR STORM EVENT *
************************************************************************** FILE NAME: W:\3828\P100.DAT
TIME/DATE OF STUDY: 09:52 04/05/2022
---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
---------------------------------------------------------------------------- USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.010
10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 0.820
100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.940
100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.200
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.5003939
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.5001161
COMPUTED RAINFALL INTENSITY DATA:

STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.200 SLOPE OF INTENSITY DURATION CURVE = 0.5001
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: CONSIDER ALL CONFLUENCE STREAM COMBINATIONS

FOR ALL DOWNSTREAM ANALYSES
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING

WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:

1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)

2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
**************************************************************************** FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================

ASSUMED INITIAL SUBAREA UNIFORM

DEVELOPMENT IS COMMERCIAL
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH(FEET) = 620.00
UPSTREAM ELEVATION(FEET) = 1754.90
DOWNSTREAM ELEVATION(FEET) = 1727.54
ELEVATION DIFFERENCE(FEET) = 27.36
TC = 0.303*[( 620.00**3)/( 27.36)]**.2 = 7.406
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.416
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8789
SOIL CLASSIFICATION IS "B"
SUBAREA RUNOFF(CFS) = 18.29
TOTAL AREA(ACRES) = 6.09 TOTAL RUNOFF(CFS) = 18.29
**************************************************************************** FLOW PROCESS FROM NODE 101.00 TO NODE 102.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
F.1.l
Packet Pg. 1960 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1724.00 DOWNSTREAM(FEET) = 1723.67 FLOW LENGTH(FEET) = 193.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 33.0 INCH PIPE IS 22.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 4.31
ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 18.29
PIPE TRAVEL TIME(MIN.) = 0.75 Tc(MIN.) = 8.15
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 102.00 = 813.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 102.00 TO NODE 102.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.256
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8781
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.01 SUBAREA RUNOFF(CFS) = 5.75
TOTAL AREA(ACRES) = 8.1 TOTAL RUNOFF(CFS) = 24.03
TC(MIN.) = 8.15
**************************************************************************** FLOW PROCESS FROM NODE 102.00 TO NODE 103.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1723.67 DOWNSTREAM(FEET) = 1723.22 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 33.0 INCH PIPE IS 22.0 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 5.70
ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 24.03
PIPE TRAVEL TIME(MIN.) = 0.44 Tc(MIN.) = 8.59
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 103.00 = 963.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 103.00 TO NODE 103.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.172
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8777
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.01 SUBAREA RUNOFF(CFS) = 5.60
TOTAL AREA(ACRES) = 10.1 TOTAL RUNOFF(CFS) = 29.63
TC(MIN.) = 8.59
**************************************************************************** FLOW PROCESS FROM NODE 103.00 TO NODE 104.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1723.22 DOWNSTREAM(FEET) = 1722.57 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 33.0 INCH PIPE IS 22.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.88
ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 29.63
PIPE TRAVEL TIME(MIN.) = 0.36 Tc(MIN.) = 8.95
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 104.00 = 1113.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 104.00 TO NODE 104.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.107
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8773
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.01 SUBAREA RUNOFF(CFS) = 5.48
TOTAL AREA(ACRES) = 12.1 TOTAL RUNOFF(CFS) = 35.11
TC(MIN.) = 8.95
**************************************************************************** FLOW PROCESS FROM NODE 104.00 TO NODE 105.00 IS CODE = 31 F.1.l
Packet Pg. 1961 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1722.57 DOWNSTREAM(FEET) = 1721.94 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 33.0 INCH PIPE IS 26.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.94
ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 35.11
PIPE TRAVEL TIME(MIN.) = 0.36 Tc(MIN.) = 9.31
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 105.00 = 1263.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 105.00 TO NODE 105.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.046
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8770
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.59 SUBAREA RUNOFF(CFS) = 4.25
TOTAL AREA(ACRES) = 13.7 TOTAL RUNOFF(CFS) = 39.36
TC(MIN.) = 9.31
**************************************************************************** FLOW PROCESS FROM NODE 105.00 TO NODE 106.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1721.94 DOWNSTREAM(FEET) = 1721.22 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 36.0 INCH PIPE IS 24.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 7.68
ESTIMATED PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 39.36
PIPE TRAVEL TIME(MIN.) = 0.33 Tc(MIN.) = 9.64
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 106.00 = 1413.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 106.00 TO NODE 106.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.994
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8767
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.00 SUBAREA RUNOFF(CFS) = 5.25
TOTAL AREA(ACRES) = 15.7 TOTAL RUNOFF(CFS) = 44.61
TC(MIN.) = 9.64
**************************************************************************** FLOW PROCESS FROM NODE 106.00 TO NODE 107.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1721.22 DOWNSTREAM(FEET) = 1720.51 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 36.0 INCH PIPE IS 27.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 7.78
ESTIMATED PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 44.61
PIPE TRAVEL TIME(MIN.) = 0.32 Tc(MIN.) = 9.96
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 107.00 = 1563.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 107.00 TO NODE 107.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.946
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8764
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.01 SUBAREA RUNOFF(CFS) = 5.19
TOTAL AREA(ACRES) = 17.7 TOTAL RUNOFF(CFS) = 49.79
TC(MIN.) = 9.96
F.1.l
Packet Pg. 1962 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley **************************************************************************** FLOW PROCESS FROM NODE 107.00 TO NODE 108.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1720.51 DOWNSTREAM(FEET) = 1719.76 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 36.0 INCH PIPE IS 29.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 8.03
ESTIMATED PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 49.79
PIPE TRAVEL TIME(MIN.) = 0.31 Tc(MIN.) = 10.27
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 108.00 = 1713.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 108.00 TO NODE 108.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.901
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8761
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.59 SUBAREA RUNOFF(CFS) = 4.04
TOTAL AREA(ACRES) = 19.3 TOTAL RUNOFF(CFS) = 53.84
TC(MIN.) = 10.27
**************************************************************************** FLOW PROCESS FROM NODE 108.00 TO NODE 109.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1719.76 DOWNSTREAM(FEET) = 1719.01 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 39.0 INCH PIPE IS 28.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 8.38
ESTIMATED PIPE DIAMETER(INCH) = 39.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 53.84
PIPE TRAVEL TIME(MIN.) = 0.30 Tc(MIN.) = 10.57
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 109.00 = 1863.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 109.00 TO NODE 109.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.860
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8759
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.02 SUBAREA RUNOFF(CFS) = 5.06
TOTAL AREA(ACRES) = 21.3 TOTAL RUNOFF(CFS) = 58.89
TC(MIN.) = 10.57
**************************************************************************** FLOW PROCESS FROM NODE 109.00 TO NODE 110.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1719.01 DOWNSTREAM(FEET) = 1718.27 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 39.0 INCH PIPE IS 30.7 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 8.41
ESTIMATED PIPE DIAMETER(INCH) = 39.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 58.89
PIPE TRAVEL TIME(MIN.) = 0.30 Tc(MIN.) = 10.87
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 110.00 = 2013.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 110.00 TO NODE 110.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.820
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8756
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 4.41 SUBAREA RUNOFF(CFS) = 10.89
TOTAL AREA(ACRES) = 25.7 TOTAL RUNOFF(CFS) = 69.78
F.1.l
Packet Pg. 1963 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley TC(MIN.) = 10.87
**************************************************************************** FLOW PROCESS FROM NODE 110.00 TO NODE 111.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1718.27 DOWNSTREAM(FEET) = 1712.62 FLOW LENGTH(FEET) = 758.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 39.0 INCH PIPE IS 29.7 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 10.30
ESTIMATED PIPE DIAMETER(INCH) = 39.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 69.78
PIPE TRAVEL TIME(MIN.) = 1.23 Tc(MIN.) = 12.09
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 111.00 = 2771.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 111.00 TO NODE 111.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.673
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8747
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 3.27 SUBAREA RUNOFF(CFS) = 7.65
TOTAL AREA(ACRES) = 29.0 TOTAL RUNOFF(CFS) = 77.43
TC(MIN.) = 12.09
**************************************************************************** FLOW PROCESS FROM NODE 111.00 TO NODE 111.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.673
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8747
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.68 SUBAREA RUNOFF(CFS) = 1.59
TOTAL AREA(ACRES) = 29.7 TOTAL RUNOFF(CFS) = 79.02
TC(MIN.) = 12.09
**************************************************************************** FLOW PROCESS FROM NODE 111.00 TO NODE 112.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1712.62 DOWNSTREAM(FEET) = 1708.53 FLOW LENGTH(FEET) = 381.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 39.0 INCH PIPE IS 28.3 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 12.28
ESTIMATED PIPE DIAMETER(INCH) = 39.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 79.02
PIPE TRAVEL TIME(MIN.) = 0.52 Tc(MIN.) = 12.61
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 112.00 = 3152.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 112.00 TO NODE 112.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.618
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8743
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.87 SUBAREA RUNOFF(CFS) = 4.28
TOTAL AREA(ACRES) = 31.6 TOTAL RUNOFF(CFS) = 83.30
TC(MIN.) = 12.61
**************************************************************************** FLOW PROCESS FROM NODE 112.00 TO NODE 112.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.618
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8743
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.20 SUBAREA RUNOFF(CFS) = 5.04
TOTAL AREA(ACRES) = 33.8 TOTAL RUNOFF(CFS) = 88.34
TC(MIN.) = 12.61
F.1.l
Packet Pg. 1964 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley **************************************************************************** FLOW PROCESS FROM NODE 112.00 TO NODE 113.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1708.53 DOWNSTREAM(FEET) = 1707.12 FLOW LENGTH(FEET) = 285.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 45.0 INCH PIPE IS 36.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 9.27
ESTIMATED PIPE DIAMETER(INCH) = 45.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 88.34
PIPE TRAVEL TIME(MIN.) = 0.51 Tc(MIN.) = 13.12
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 113.00 = 3437.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 113.00 TO NODE 113.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.566
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8739
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.24 SUBAREA RUNOFF(CFS) = 0.54
TOTAL AREA(ACRES) = 34.0 TOTAL RUNOFF(CFS) = 88.87
TC(MIN.) = 13.12
**************************************************************************** FLOW PROCESS FROM NODE 113.00 TO NODE 114.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1707.12 DOWNSTREAM(FEET) = 1706.91 FLOW LENGTH(FEET) = 41.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 45.0 INCH PIPE IS 35.8 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 9.43
ESTIMATED PIPE DIAMETER(INCH) = 45.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 88.87
PIPE TRAVEL TIME(MIN.) = 0.07 Tc(MIN.) = 13.20
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 114.00 = 3478.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 114.00 TO NODE 114.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.559
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8739
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.22 SUBAREA RUNOFF(CFS) = 4.96
TOTAL AREA(ACRES) = 36.2 TOTAL RUNOFF(CFS) = 93.84
TC(MIN.) = 13.20
**************************************************************************** FLOW PROCESS FROM NODE 114.00 TO NODE 115.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1706.91 DOWNSTREAM(FEET) = 1706.46 FLOW LENGTH(FEET) = 90.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 48.0 INCH PIPE IS 34.8 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 9.62
ESTIMATED PIPE DIAMETER(INCH) = 48.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 93.84
PIPE TRAVEL TIME(MIN.) = 0.16 Tc(MIN.) = 13.35
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 115.00 = 3568.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 115.00 TO NODE 115.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.544
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8738
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.69 SUBAREA RUNOFF(CFS) = 3.76
F.1.l
Packet Pg. 1965 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley TOTAL AREA(ACRES) = 37.9 TOTAL RUNOFF(CFS) = 97.60
TC(MIN.) = 13.35
**************************************************************************** FLOW PROCESS FROM NODE 115.00 TO NODE 219.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1706.46 DOWNSTREAM(FEET) = 1706.30 FLOW LENGTH(FEET) = 30.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 48.0 INCH PIPE IS 35.0 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 9.94
ESTIMATED PIPE DIAMETER(INCH) = 48.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 97.60
PIPE TRAVEL TIME(MIN.) = 0.05 Tc(MIN.) = 13.40
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 219.00 = 3598.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 219.00 TO NODE 219.00 IS CODE = 10 ---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 200.00 TO NODE 201.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================

ASSUMED INITIAL SUBAREA UNIFORM

DEVELOPMENT IS COMMERCIAL
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH(FEET) = 364.00
UPSTREAM ELEVATION(FEET) = 1731.47
DOWNSTREAM ELEVATION(FEET) = 1729.87
ELEVATION DIFFERENCE(FEET) = 1.60
TC = 0.303*[( 364.00**3)/( 1.60)]**.2 = 9.493
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.017
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8768
SOIL CLASSIFICATION IS "B"
SUBAREA RUNOFF(CFS) = 2.94
TOTAL AREA(ACRES) = 1.11 TOTAL RUNOFF(CFS) = 2.94
**************************************************************************** FLOW PROCESS FROM NODE 201.00 TO NODE 202.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1725.87 DOWNSTREAM(FEET) = 1724.98 FLOW LENGTH(FEET) = 368.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 15.0 INCH PIPE IS 10.9 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 3.08
ESTIMATED PIPE DIAMETER(INCH) = 15.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 2.94
PIPE TRAVEL TIME(MIN.) = 1.99 Tc(MIN.) = 11.49
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 202.00 = 732.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 202.00 TO NODE 202.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.743
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8751
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.03 SUBAREA RUNOFF(CFS) = 2.47
TOTAL AREA(ACRES) = 2.1 TOTAL RUNOFF(CFS) = 5.41
TC(MIN.) = 11.49
**************************************************************************** FLOW PROCESS FROM NODE 202.00 TO NODE 203.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1724.98 DOWNSTREAM(FEET) = 1723.86 FLOW LENGTH(FEET) = 224.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.0 INCHES
F.1.l
Packet Pg. 1966 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley PIPE-FLOW VELOCITY(FEET/SEC.) = 4.79
ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 5.41
PIPE TRAVEL TIME(MIN.) = 0.78 Tc(MIN.) = 12.26
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 203.00 = 956.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 203.00 TO NODE 203.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.655
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8745
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.69 SUBAREA RUNOFF(CFS) = 1.60
TOTAL AREA(ACRES) = 2.8 TOTAL RUNOFF(CFS) = 7.01
TC(MIN.) = 12.26
**************************************************************************** FLOW PROCESS FROM NODE 203.00 TO NODE 204.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1723.86 DOWNSTREAM(FEET) = 1723.67 FLOW LENGTH(FEET) = 44.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 18.0 INCH PIPE IS 14.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 4.69
ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 7.01
PIPE TRAVEL TIME(MIN.) = 0.16 Tc(MIN.) = 12.42
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 204.00 = 1000.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 204.00 TO NODE 204.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.638
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8744
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 4.27 SUBAREA RUNOFF(CFS) = 9.85
TOTAL AREA(ACRES) = 7.1 TOTAL RUNOFF(CFS) = 16.86
TC(MIN.) = 12.42
**************************************************************************** FLOW PROCESS FROM NODE 204.00 TO NODE 205.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1723.67 DOWNSTREAM(FEET) = 1722.94 FLOW LENGTH(FEET) = 143.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 24.0 INCH PIPE IS 19.4 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.19
ESTIMATED PIPE DIAMETER(INCH) = 24.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 16.86
PIPE TRAVEL TIME(MIN.) = 0.38 Tc(MIN.) = 12.81
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 205.00 = 1143.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 205.00 TO NODE 205.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.598
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8741
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.70 SUBAREA RUNOFF(CFS) = 3.86
TOTAL AREA(ACRES) = 8.8 TOTAL RUNOFF(CFS) = 20.72
TC(MIN.) = 12.81
**************************************************************************** FLOW PROCESS FROM NODE 205.00 TO NODE 206.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1722.94 DOWNSTREAM(FEET) = 1722.75 F.1.l
Packet Pg. 1967 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley FLOW LENGTH(FEET) = 40.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 27.0 INCH PIPE IS 20.4 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.43
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 20.72
PIPE TRAVEL TIME(MIN.) = 0.10 Tc(MIN.) = 12.91
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 206.00 = 1183.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 206.00 TO NODE 206.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.587
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8741
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.70 SUBAREA RUNOFF(CFS) = 1.58
TOTAL AREA(ACRES) = 9.5 TOTAL RUNOFF(CFS) = 22.30
TC(MIN.) = 12.91
**************************************************************************** FLOW PROCESS FROM NODE 206.00 TO NODE 207.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1722.75 DOWNSTREAM(FEET) = 1722.22 FLOW LENGTH(FEET) = 106.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 27.0 INCH PIPE IS 21.3 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.63
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 22.30
PIPE TRAVEL TIME(MIN.) = 0.27 Tc(MIN.) = 13.18
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 207.00 = 1289.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 207.00 TO NODE 207.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.561
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8739
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.34 SUBAREA RUNOFF(CFS) = 3.00
TOTAL AREA(ACRES) = 10.8 TOTAL RUNOFF(CFS) = 25.30
TC(MIN.) = 13.18
**************************************************************************** FLOW PROCESS FROM NODE 207.00 TO NODE 208.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1722.22 DOWNSTREAM(FEET) = 1721.63 FLOW LENGTH(FEET) = 117.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 30.0 INCH PIPE IS 20.7 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.99
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 25.30
PIPE TRAVEL TIME(MIN.) = 0.28 Tc(MIN.) = 13.46
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 208.00 = 1406.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 208.00 TO NODE 208.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.534
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8737
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.70 SUBAREA RUNOFF(CFS) = 1.55
TOTAL AREA(ACRES) = 11.5 TOTAL RUNOFF(CFS) = 26.85
TC(MIN.) = 13.46
**************************************************************************** FLOW PROCESS FROM NODE 208.00 TO NODE 209.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< F.1.l
Packet Pg. 1968 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1721.63 DOWNSTREAM(FEET) = 1721.50 FLOW LENGTH(FEET) = 28.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 30.0 INCH PIPE IS 22.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.81
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 26.85
PIPE TRAVEL TIME(MIN.) = 0.07 Tc(MIN.) = 13.52
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 209.00 = 1434.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 209.00 TO NODE 209.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.528
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8736
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.69 SUBAREA RUNOFF(CFS) = 3.73
TOTAL AREA(ACRES) = 13.2 TOTAL RUNOFF(CFS) = 30.59
TC(MIN.) = 13.52
**************************************************************************** FLOW PROCESS FROM NODE 209.00 TO NODE 210.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1721.50 DOWNSTREAM(FEET) = 1720.78 FLOW LENGTH(FEET) = 145.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 33.0 INCH PIPE IS 21.9 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 7.32
ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 30.59
PIPE TRAVEL TIME(MIN.) = 0.33 Tc(MIN.) = 13.85
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 210.00 = 1579.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 210.00 TO NODE 210.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.498
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8734
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.34 SUBAREA RUNOFF(CFS) = 2.92
TOTAL AREA(ACRES) = 14.6 TOTAL RUNOFF(CFS) = 33.51
TC(MIN.) = 13.85
**************************************************************************** FLOW PROCESS FROM NODE 210.00 TO NODE 211.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1720.78 DOWNSTREAM(FEET) = 1720.16 FLOW LENGTH(FEET) = 51.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 27.0 INCH PIPE IS 20.6 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 10.30
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 33.51
PIPE TRAVEL TIME(MIN.) = 0.08 Tc(MIN.) = 13.94
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 211.00 = 1630.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 211.00 TO NODE 211.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.490
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8734
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.70 SUBAREA RUNOFF(CFS) = 1.52
TOTAL AREA(ACRES) = 15.3 TOTAL RUNOFF(CFS) = 35.03
TC(MIN.) = 13.94
**************************************************************************** FLOW PROCESS FROM NODE 211.00 TO NODE 212.00 IS CODE = 31 ---------------------------------------------------------------------------- F.1.l
Packet Pg. 1969 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1720.16 DOWNSTREAM(FEET) = 1719.04 FLOW LENGTH(FEET) = 94.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 27.0 INCH PIPE IS 21.7 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 10.23
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 35.03
PIPE TRAVEL TIME(MIN.) = 0.15 Tc(MIN.) = 14.09
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 212.00 = 1724.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 212.00 TO NODE 212.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.477
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8732
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.70 SUBAREA RUNOFF(CFS) = 3.68
TOTAL AREA(ACRES) = 17.0 TOTAL RUNOFF(CFS) = 38.71
TC(MIN.) = 14.09
**************************************************************************** FLOW PROCESS FROM NODE 212.00 TO NODE 213.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1719.04 DOWNSTREAM(FEET) = 1717.49 FLOW LENGTH(FEET) = 136.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 30.0 INCH PIPE IS 21.0 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 10.55
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 38.71
PIPE TRAVEL TIME(MIN.) = 0.21 Tc(MIN.) = 14.30
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 213.00 = 1860.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 213.00 TO NODE 213.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.458
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8731
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.71 SUBAREA RUNOFF(CFS) = 1.52
TOTAL AREA(ACRES) = 17.7 TOTAL RUNOFF(CFS) = 40.23
TC(MIN.) = 14.30
**************************************************************************** FLOW PROCESS FROM NODE 213.00 TO NODE 214.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1717.49 DOWNSTREAM(FEET) = 1717.36 FLOW LENGTH(FEET) = 15.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 30.0 INCH PIPE IS 24.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 9.36
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 40.23
PIPE TRAVEL TIME(MIN.) = 0.03 Tc(MIN.) = 14.33
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 214.00 = 1875.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 214.00 TO NODE 214.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.456
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8731
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.70 SUBAREA RUNOFF(CFS) = 3.64
TOTAL AREA(ACRES) = 19.4 TOTAL RUNOFF(CFS) = 43.88
TC(MIN.) = 14.33
**************************************************************************** F.1.l
Packet Pg. 1970 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley FLOW PROCESS FROM NODE 214.00 TO NODE 215.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1717.36 DOWNSTREAM(FEET) = 1714.31 FLOW LENGTH(FEET) = 145.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 27.0 INCH PIPE IS 20.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 13.54
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 43.88
PIPE TRAVEL TIME(MIN.) = 0.18 Tc(MIN.) = 14.51
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 215.00 = 2020.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 215.00 TO NODE 215.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.441
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8730
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.34 SUBAREA RUNOFF(CFS) = 2.86
TOTAL AREA(ACRES) = 20.7 TOTAL RUNOFF(CFS) = 46.73
TC(MIN.) = 14.51
**************************************************************************** FLOW PROCESS FROM NODE 215.00 TO NODE 216.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1714.31 DOWNSTREAM(FEET) = 1712.96 FLOW LENGTH(FEET) = 64.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 27.0 INCH PIPE IS 21.7 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 13.62
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 46.73
PIPE TRAVEL TIME(MIN.) = 0.08 Tc(MIN.) = 14.59
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 216.00 = 2084.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 216.00 TO NODE 216.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.434
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8729
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.71 SUBAREA RUNOFF(CFS) = 1.51
TOTAL AREA(ACRES) = 21.4 TOTAL RUNOFF(CFS) = 48.24
TC(MIN.) = 14.59
**************************************************************************** FLOW PROCESS FROM NODE 216.00 TO NODE 217.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1712.96 DOWNSTREAM(FEET) = 1711.30 FLOW LENGTH(FEET) = 81.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 30.0 INCH PIPE IS 19.9 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 13.96
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 48.24
PIPE TRAVEL TIME(MIN.) = 0.10 Tc(MIN.) = 14.68
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 217.00 = 2165.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 217.00 TO NODE 217.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.426
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8729
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.68 SUBAREA RUNOFF(CFS) = 3.56
TOTAL AREA(ACRES) = 23.1 TOTAL RUNOFF(CFS) = 51.80
TC(MIN.) = 14.68
F.1.l
Packet Pg. 1971 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley **************************************************************************** FLOW PROCESS FROM NODE 217.00 TO NODE 218.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1711.30 DOWNSTREAM(FEET) = 1708.20 FLOW LENGTH(FEET) = 145.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 30.0 INCH PIPE IS 20.6 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 14.39
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 51.80
PIPE TRAVEL TIME(MIN.) = 0.17 Tc(MIN.) = 14.85
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 218.00 = 2310.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 218.00 TO NODE 218.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.412
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8727
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 0.78 SUBAREA RUNOFF(CFS) = 1.64
TOTAL AREA(ACRES) = 23.9 TOTAL RUNOFF(CFS) = 53.44
TC(MIN.) = 14.85
**************************************************************************** FLOW PROCESS FROM NODE 218.00 TO NODE 218.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.412
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8727
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 1.34 SUBAREA RUNOFF(CFS) = 2.82
TOTAL AREA(ACRES) = 25.2 TOTAL RUNOFF(CFS) = 56.26
TC(MIN.) = 14.85
**************************************************************************** FLOW PROCESS FROM NODE 218.00 TO NODE 219.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1708.20 DOWNSTREAM(FEET) = 1706.30 FLOW LENGTH(FEET) = 87.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 30.0 INCH PIPE IS 21.8 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 14.71
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 56.26
PIPE TRAVEL TIME(MIN.) = 0.10 Tc(MIN.) = 14.95
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 219.00 = 2397.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 219.00 TO NODE 219.00 IS CODE = 11 ---------------------------------------------------------------------------- >>>>>CONFLUENCE MEMORY BANK # 1 WITH THE MAIN-STREAM MEMORY<<<<< ============================================================================ ** MAIN STREAM CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE)
1 56.26 14.95 2.404 25.23
LONGEST FLOWPATH FROM NODE 200.00 TO NODE 219.00 = 2397.00 FEET. ** MEMORY BANK # 1 CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE)
1 97.60 13.40 2.539 37.91
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 219.00 = 3598.00 FEET. ** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) (INCH/HOUR)
1 148.03 13.40 2.539
2 148.66 14.95 2.404
F.1.l
Packet Pg. 1972 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:

PEAK FLOW RATE(CFS) = 148.66 Tc(MIN.) = 14.95
TOTAL AREA(ACRES) = 63.1
**************************************************************************** FLOW PROCESS FROM NODE 219.00 TO NODE 219.00 IS CODE = 12 ---------------------------------------------------------------------------- >>>>>CLEAR MEMORY BANK # 1 <<<<<
============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 219.00 TO NODE 220.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1706.30 DOWNSTREAM(FEET) = 1702.77 FLOW LENGTH(FEET) = 706.00 MANNING'S N = 0.012
DEPTH OF FLOW IN 57.0 INCH PIPE IS 41.4 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 10.79
ESTIMATED PIPE DIAMETER(INCH) = 57.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 148.66
PIPE TRAVEL TIME(MIN.) = 1.09 Tc(MIN.) = 16.04
LONGEST FLOWPATH FROM NODE 100.00 TO NODE 220.00 = 4304.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 220.00 TO NODE 220.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================ 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.321
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8720
SOIL CLASSIFICATION IS "B"
SUBAREA AREA(ACRES) = 2.96 SUBAREA RUNOFF(CFS) = 5.99
TOTAL AREA(ACRES) = 66.1 TOTAL RUNOFF(CFS) = 154.66
TC(MIN.) = 16.04
============================================================================ END OF STUDY SUMMARY:

TOTAL AREA(ACRES) = 66.1 TC(MIN.) = 16.04
PEAK FLOW RATE(CFS) = 154.66
*** PEAK FLOW RATE TABLE ***
Q(CFS) Tc(MIN.)
1 154.34 14.49
2 154.66 16.04
============================================================================ ============================================================================

END OF RATIONAL METHOD ANALYSIS

F.1.l
Packet Pg. 1973 Attachment: Preliminary Hydrology Report (E-Commerce) for Moreno Valley Trade Center - Revised Project Evaluation (5846 : Moreno Valley 500P
____________________________________________________________________________ ****************************************************************************

RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON

RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright 1982-2016 Advanced Engineering Software (aes) (Rational Tabling Version 23.0)
Release Date: 07/01/2016 License ID 1435
Analysis prepared by:

THIENES ENGINEERING, INC.
14349 FIRESTONE BLVD
LA MIRADA, CA 90638
714-521-4811
************************** DESCRIPTION OF STUDY ************************** * TEI JOB 3828 *
* 100-YEAR STORM EVENT *
* STREET FLOW (NODES 500-502) *
************************************************************************** FILE NAME: W:\3828\500P.DAT
TIME/DATE OF STUDY: 08:59 03/22/2021
---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
---------------------------------------------------------------------------- USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.010
10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 0.820
100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.940
100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.200
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.5003939
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.5001161
COMPUTED RAINFALL INTENSITY DATA:

STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.200 SLOPE OF INTENSITY DURATION CURVE = 0.5001
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: CONSIDER ALL CONFLUENCE STREAM COMBINATIONS

FOR ALL DOWNSTREAM ANALYSES
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING

WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:

1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)

2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
**************************************************************************** FLOW PROCESS FROM NODE 500.00 TO NODE 501.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================

ASSUMED INITIAL SUBAREA UNIFORM

DEVELOPMENT IS COMMERCIAL
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH(FEET) = 860.00
UPSTREAM ELEVATION(FEET) = 1754.80
DOWNSTREAM ELEVATION(FEET) = 1749.00
ELEVATION DIFFERENCE(FEET) = 5.80
TC = 0.303*[( 860.00**3)/( 5.80)]**.2 = 12.291
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.652
COMMERCIAL DEVELOPMENT RUNOFF COEFFICIENT = .8745
SOIL CLASSIFICATION IS "B"
SUBAREA RUNOFF(CFS) = 2.43
TOTAL AREA(ACRES) = 1.05 TOTAL RUNOFF(CFS) = 2.43
**************************************************************************** FLOW PROCESS FROM NODE 501.00 TO NODE 502.00 IS CODE = 61

Page 1 ends
← All documents from this meeting