We also appreciate Newark going above the buffer recommendations for realistic zoning capacity. Among the sites we’re excited about is the Newpark project which will build medium density units on parking lots. This project is a perfect example of infill with access to AC Transit lines to BART.

We also want to commend the city for Policy H6.7: Residential Development in the FloodPlain.

We continue our opposition to the Sanctuary West project. We are glad that the city recognizes that such developments are not in the interest of Newark residents nor the prudent fiduciary responsibility of the council and staff. In an era where our communities are facing the consequences of climate change and sea level rise, each community should be actively assessing how it will ensure future developments and infrastructure will be resilient to flood risk without adversely impacting existing residents and the environment. Building in Area 4 baylands APPENDIX D PUBLIC COMMENT D-87

NEWARK GENERAL PLAN HOUSING
would both greatly increase flood risk across the city, and also squander the opportunity to utilize these lands as a valuable flood buffer to protect the community from flooding and sea level rise, while also providing improved natural wildlife habitat and increased outdoor access opportunities for residents. Additionally, since there is broad community opposition from both environmental and pro-housing organizations in the area, building here has a high chance of community pushback which could delay the project to outside the planning period.

We strongly recommend updating your Climate Action Plan which is now 13 years old in order to implement mitigation measures for water level rise (both sea level rise and groundwater rise) and to reduce greenhouse gas (GHG) emissions. We also recommend adding a policy to restore wetlands in order to maximize carbon sequestration and protection from sea level rise.

Program H3.5: Parking standards study can be strengthened to commit to reducing parking minimums. A study from UC Berkeley’s Terner Center found, “the presence of structured parking added nearly $36,000 per unit.” The Draft Housing Element notes that Newark has higher parking1 minimums than neighboring jurisdictions. Parking, especially covered parking, significantly increases the cost of housing developments and uses space for cars rather than for people. In order to combat climate change we know that we must reduce our reliance on cars and fossil fuels. By prioritizing land for people rather than cars we can address the housing crisis and GHG reduction goals. Due to this higher level of parking and its cost, we strongly urge you to commit to reducing the amount of required parking to no more than 0.5 spaces per residential unit, and zero in transit-adjacent areas.

Program H2.1: Encourage new middle-density housing with SB 9 and SB 10. While this is a laudable direction for the city to go to encourage housing abundance throughout the city, it could be strengthened with a few more objective outcomes for the program. (1) The SB 9 ordinance should not reduce the buildable envelope below what an underlying single-family zone allows. (2) Missing middle zoning should allow at least 4 units on at least 80% of single-family lots—not merely legal as density, but practical in terms of development standards.

See the Portland Residential Infill Program for a possible direction where buildable envelope is increased the more units are planned on the lot. (3) No areas should be exempted from missing middle except based on floodplain, fire risk, or other major public health / ecological risks. (4) Required parking should continue to be no more than 0.5 spaces /unit, or zero near any bus line, as the major space requirements of off-street parking reliably kills missing middle.

As we’ve mentioned, we oppose site number 2: Sanctuary West because of its location on baylands that are expected to see a nearly two feet rise of water levels in less than 50 years. We continue to urge you to remove this from your site list.

To support our vision for Newark, Greenbelt Alliance and other partnering organizations have crafted a go-to guide for accelerating equitable adaptation to the climate crisis; The Resilience Playbook. The Playbook brings together curated strategies, recommendations, and tools to support local decision makers and community leaders wherever they are in their journey.

We look forward to continuing to engage with Newark and the community on how this vital work can move forward in the new year.

Sincerely,
APPENDIX D PUBLIC COMMENT D-88

NEWARK GENERAL PLAN HOUSING
Victor Flores, East Bay Resilience Manager,
Greenbelt Alliance
David Lewis, Executive Director
Save The Bay
Maxwell Davis and the 2500 members of East
Bay for Everyone
1 https://ternercenter.berkeley.edu/research-and-policy/ab-1401-residential-parking-requirements/ Comment 10
The City of Newark received the following comment as a form letter from 72 individuals. A full list ofthe individuals follows the letter.

To: Steven Turner
Subject: Remove Sanctuary West from the Newark Housing Element Steven Turner,
Dear Mayor Hannon, Vice Mayor Collazo and Newark City Councilmembers, Thank you for putting together a robust Housing Element draft. This is a once in a decade moment for Newark to make pivotal progress on climate change and fair housing by developing a comprehensive housing strategy that builds housing in existing neighborhoods, while ensuring the long-term climate resilience of the city by protecting protecting valuable open space along the shoreline as wildlife habitat while providing community resilience as a flood buffer from sea level rise.

I am writing to you today to implore you to remove Newark Area 4 (“Sanctuary West”) from your housing site inventory. This is not a good place to build housing and should not be how Newark meets a significant portion of its housing requirement. Newark Area 4 is almost entirely within a flood zone, and the site is anticipated to be almost completely inundated with just 1 meter of sea level rise. Additionally, new studies show that development of Area 4 could cause flooding for other shoreline communities in the Bay Area.

Developing this site will increase flood risk to current and future residents and cause catastrophic financial issues to the city in the future.

As evidenced by recent rains, Newark is already experiencing flooding and if Area 4 is developed, flooding will only increase. Newark has the capacity within the existing urban areas to meet its RHNA goals without putting future and current residents at risk.

Further, the wetlands and wetland restoration potential of Newark Area 4 should be embraced for the numerous important benefits they provide. Wetlands not only protect the city from flooding and provide wildlife habitat, they also clean our Bay waters, and have been demonstrated to be one of the most powerful tools in nature for fighting climate change, by sequestering carbon even more efficiently than our forests. We desperately need to protect and restore all the San Francisco Bay wetlands we can, and Newark has an incredible opportunity to support this regional goal.

APPENDIX D PUBLIC COMMENT D-89

NEWARK GENERAL PLAN HOUSING
We strongly urge Newark to become a climate-forward city by focusing on infill growth in existing neighborhoods - rather than putting housing in an undeveloped shoreline flood zone that should be permanently protected as a wildlife habitat and as a valuable buffer to protect the community from flooding and sea level rise.

Thank you,
[Name]
List of Individuals who sent the comment form letter:
● Neelam Noorani ● Andrea Resendiz ● Cassandra Jauregui ● Jonathan Coreas-Diaz ● Victoria Ornelas ● Christopher Sulots ● Jean Mccauley ● Nael Mohammad ● Jaycee Moriguchi
● Marissa Hernandez ● Oscar Pena ● Kurt Harvey
● Ashi Kodi Kodi ● Lauren Farias ● Christina Johnson
● Susana Real ● Kaitlyn Fregoso ● Timothy Lee
● Marilyn Painter ● Belle Farias ● Nazim Haffaf
● Jesus Jimenez ● Kamilah Arteaga ● Arianna G.
● Agustina Maradona ● Eden Kidd ● Michael Brazil
● Dakota Sierras ● Jaime Arredondo ● Allysia Irwin
● Alyssa Lopez ● Anthony Medina ● Janice MacKenzie
● K. Encarnacion ● Vaidehi Sharma ● Amanda C.
● Analeez Iniguez ● Lyndie Chiou ● Shawn Bean
● Lauren Arreguin ● Wendy Chou ● Amanda Cordoba
● Tia Triplett ● Justin Burks ● Teresa Pinto
● Kassandra Vega ● Vanessa Nunez ● Marina Montes
● David Strand ● David Alexander ● George Flint
● Monika Strand ● Malalai Mayar ● Katherine Roberts
● Timmy Thach ● Diane Petersen ● Thalia Lubin
● Katelyn Costa ● Maia Rodriguez ● AJ Cho
● Jasmine Sandhu ● Raul Maldonado ● A.F. Shayne
● John Oda ● Remi Tan ● Joan Starr
● Ben Keller ● Kermit Cuff ● Maxwell Davis
● Cyril Bouteille ● Sarah Bell ● Shaina
Chemparathypatagonia
Comment 11
March 27, 2023
Transmitted Via Electronic Mail via the City Clerk
APPENDIX D PUBLIC COMMENT D-90

NEWARK GENERAL PLAN HOUSING
Steven Turner, Community Development Director
37101 Newark Blvd.

Newark, CA 94560
Email: [email protected]
RE: Public comments by San Francisco Baykeeper on Newark’s Draft Housing Element.

Dear Mr. Turner,
I write on behalf of San Francisco Baykeeper (“Baykeeper”) in opposition to the City of Newark’s inclusion of the Sanctuary West Project (also commonly known as “Area 4”) in its Draft Housing Element. Baykeeper submits these comments on behalf of approximately 5,000 members and supporters who live and recreate in and around the San Francisco Bay Area. Together, our mission is to defend San Francisco Bay from the biggest threats and hold polluters and government agencies accountable to create healthy communities and help wildlife thrive. Our team of scientists and lawyers investigate pollution via aerial and water patrols, strengthen regulations through science and policy advocacy, and enforce environmental laws on behalf of the public.

It is discouraging to see the city continuing to recommend and approve housing at Area 4.

Instead of allowing this area to be used as a natural barrier to mitigate sea level rise (SLR) and groundwater inundation as climate impacts increase, moving forward with development will expose more than a thousand new residents to SLR and put hundreds of millions of dollars of property at risk. With only about ten percent of the original wetlands remaining around San Francisco Bay, keeping these natural bufferlands is essential to having a resilient community and allowing shorelines to adapt in the midst of climate change.

In addition, importing fill and paving over Area 4 would destroy restorable diked Baylands and harm wildlife habitats for over a dozen special-status species. This includes the endangered Salt Marsh Harvest Mouse, endemic to only San Francisco Bay’s marshes which are increasingly threatened with the prospect of development. Furthermore, fragmenting and degrading the existing wetlands in Area 4 will also threaten pup rookeries for harbor seals.

The scientific community has recommended Area 4 as a high priority for protection and restoration of wetlands and upland habitat in order to support San Francisco Bay wildlife species and help them adjust to rising sea levels. Congress has already authorized lands such as Area 4 to be added to the Don Edwards SF Bay National Wildlife Refuge. We urge you to follow the guidance of the region’s scientific community and prioritize protecting and restoring this land rather than development in Area 4 as planned in your current Draft Housing Element.

During the January 2023 King Tides, drone footage revealed just how much surface water already occupies the site. These images give a glimpse of what this site will look like under one foot of SLR. Seeing as this site is projected to have two feet of SLR by 2050, it is obvious why this APPENDIX D PUBLIC COMMENT D-91

NEWARK GENERAL PLAN HOUSING
is not a good site to build housing or degrade more wetland habitat.

Jan. 22, 2023, King Tides at Area 4 Photo credit: Carin High Lastly, sustainable development comes at the intersection of economic, social and environmental capitols. Area 4 development only looks at the economic benefit to build.

However, if natural capitol was also part of the equation, one would see how many benefits this land offers: greenhouse gas sequestration, nature based multi-benefit adaptation solutions to SLR, open space for community members to enjoy, and biodiversity to ensure a healthy Bay.

Staff, we implore you to remove the Sanctuary West Project from suitable housing in the 6th cycle of Newark’s Housing Element. Follow the advice of the experts and protect these wetlands to, in turn, protect your community against climate change impacts.

Thank you for the opportunity to comment on this Draft Housing Element. Please reach out to Aundi Mevoli at aundi@... with any questions.

Sincerely,
Aundi Mevoli
Field Investigator and Policy Advocate San Francisco Baykeeper APPENDIX D PUBLIC COMMENT D-92

NEWARK GENERAL PLAN HOUSING

ADDITIONAL COMMENTS RECEIVED DURING HCD REVIEW PERIODS
Comment 12 David Song I received a letter from city of Newark, regarding a piece of land that I own. 37079 Ash street, APN: 92-127-31. The letter stated that my property has been identified as a site that could be developed with residential units, and well suited for development. I have previously tried to discuss the development of this site with the planning department multipe times, with no success.

With this new initiative from the city, what kind of incentive does the city provide to owners to develop this site? Higher density? Lower permit fees? Faster approval? Less red tape?
After reading through the Housing Element report, I still could not figure out how does that report relate to my property and its potential for development.

It would be nice for the city planner to sit down with me and explain what kind of incentives the city provides to the development of my site.

I am more than happy to work with the city to develop this site and provide more housing opportunities to medium and low income families.

Best
David
Comment 13 Rishika Rawat
I was wondering where I could find a pdf of the Newark Safety Element.

Comment 14 Alyssa Lopez Hi, I was wondering if there is any action being taken to invest in some programs such as a first-time buyers programs for Newark Residents, or a low-income based programs. If so, I’d like to get more information or be interested in investing some input
Thank you!
Comment 15 Pat Callaway There has been opposition to Area 4 development and I am confused by your responses. Has Area 4 been scrapped or not?
Comment 16 Krisie Knutson
Those house are ugly , can’t you make some pretty houses APPENDIX D PUBLIC COMMENT D-93
RESOLUTION NO. 11, 201

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

NEWARK APPROVING AN AFFORDABLE HOUSING WORK
PLAN
WHEREAS, in May 2015, the City Council approved Resolution 10, 361 approving an amendment of the Newark General Plan, adopted December 12, 2013, by replacing the Housing Element with the Housing Element Update 2015; and
WHEREAS, the purpose of the Housing Element is to support the vision of assuring the provision of safe, decent, affordable shelter for all Newark residents. The Housing Element places a particular emphasis on lower income Newark residents and residents with special needs, including seniors and persons with disabilities. The Housing Element includes an evaluation of housing needs in the City, based on demographics and housing conditions. As required by state law, it identifies sites sufficient to accommodate the City' s share of the region' s housing needs over an eight -year period, the Regional Housing Need Allocation ( RHNA), developed by the Association of Bay Area Governments ( ABAG); and
WHEREAS, the State of California continues to suffer a housing affordability crisis, which also manifests at the regional and local level. Based on data from ABAG, median rents in the Bay Area have increased over 44% between 2010 and 2015, while median household income has increased by 5% over same period. In 2017, over 40% of Alameda County renters spent 35% or more of their household income on rent; and
WHEREAS, the 2015- 2023 RHNA for the Bay Area identifies a total housing need of 187, 990 units, distributed among very -low, low-, moderate-, and above -moderate income levels.

The City of Newark' s RHNA allocation for the 2015- 2023 period is 1, 078 units ( which shall be accommodated through the General Plan and Zoning Ordinance, but not necessarily constructed) and includes:
a) 330 units for very -low income households, with incomes at or below 50% of the Average Median Income (AMI)
b) 167 units for low income families, with incomes ranging from 51 % or 80% of AMI c) 158 units for moderate -income households, with incomes from 80% to 120%, and d) 423 units for above -moderate -income households with an AMI of greater than 120%; and
WHEREAS, between the period of 2015- 2020, the number of residential units constructed in the City or have had building permits issued for construction, includes 36 units of housing affordable for moderate - income households and 1, 062 units of housing affordable to above moderate -income households, for a total of 1, 098 units. The City has not produced units affordable to low-income or very -low- income households within the 2015- 2020 period, and WHEREAS, although the City has produced housing that exceeds the goal for above - moderate housing, the production goals for very -low, low, and moderate housing have not been met; and
WHEREAS, the City recognizes the importance of continuing to proactively develop affordable housing in Newark to meet he needs of families who live and work in the City, consisted with the adopted Housing Element; and
WHEREAS, in November 2020, the City Council approved a contractual services agreement with Baird + Driskell Community Planning ( Consultant) to provide affordable housing program management services to the City; and
WHEREAS, City staff directed the Consultant to conduct interviews with the City Council, the Planning Commission, and the Community Development Advisory Committee to assess the affordable housing needs of the community and prepare a work plan that would guide the efforts of City staff and the Consultant over a two-year period; and WHEREAS, based on the results of the interviews, City staff and the Consultant have produced an affordable housing work plan that includes activities for the preparation of new affordable housing requirements, polices, and actions intended to significantly incentivize the production of affordable housing within the City, particularly at the very -low and low-income levels.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Newark hereby adopts the 2021- 2023 Affordable Housing Work Plan as attached as Exhibit A.

Resolution No. 11, 201 2
I HEREBY CERTIFY the foregoing resolution was introduced at a regular meeting of the City Council of the City of Newark held on May 13, 2021, by Council Member Hannon who moved its adoption and passage, which motion was carried after being duly seconded, and passed by the following vote:

AYES: Council Members Collazo, Freitas, Hannon, Vice Mayor Bucci and Mayor Nagy
NOES: None
ABSENT: None
SECONDED: Council Member Collazo
ATEST:
s/ SHEILA HAffRRINGTO
v
City Clerk
APPROVED AS TO FORM:
s/ STOPHER. KOKOTAYLO
Interim City Attorney
Resolution No. 11, 201 3
APPROVED:

ALAN L.I
a
Mayor
0 L
O C 04 CU
y OL
C
O E
6 Im OO rnU
tq
S
m
a' ++ N O— MO
N
C
o? Lp C NM C O = aQO C
O ,,
Q3 7
0) p O O
f0 6 N
LO
5 -
O
0OSC

51. OO
wO n
y• w m m o o o
o
et
om
rn
c
o rnY o too. o c Q
a
omoo
n '
a o t6 C
c6 RS a u),,._ iC O O.... w w
O
po c
Z L O o O o' c Fcoo
m + t y- 0
a) U Oo p
p •
UE
C
CO
N4) - L
E= cu. E
t
ai to
aG
ai 61s coa
aa' E CL U- o aa60 oQ EuA O
d
O
y .

L7 N
C C O ( 6 > C f6 V
0to Y
h
t
t3 C tT ul CJ
U y O
a N
v
0 J
OU 0
mr m 3 yT. 7 CO f6 _
O
O a
L
co_
CL= a
O y
U C t6
O
2 -
0-
0 Oa L
a
O
O
C>' N
L
O. O O
US
ao
uoiv O rna fl a
Oa
r_ tm cm CD: OS
cn
0 M=
0 75, 0 - 5, 0
0 v
0 W cu
4) C
0 0 m
4) a
0 a) m
a) C
0 ca
D C
u 0
0 c CU — a o : 5
c —
CU 0 . 0 Co TO 0
moo c
ca M 70
2 c
M co
C: ` 20 C:
0 0 0 , i;:; tt: E
fo=) . 2 E
0 co
a) 47 E 0 to
w
E
E w CU CU m E ' FA CU M E
5 In
CL cr., o
IM)
4) CD th w 5
uj
a - , O'=
2 0
E co o D. m m 0 0. 2
E
E o 0 0
E 0
a)
LL 0
5-
CL
E
D
E
4)
E E
4)
3: a
E
a
E
a
E
a
E
0 U
0 C: 0
C:
0 0 0
4 0)
E
T
E
A?
E
T
E
4)
k. CL
E ECLE
a
E
U.
0 z a) 0 D a)
tw
rm fo
a) 4)
2 0
0 C
3 ZO
LL cu cu
cu c ca c a a
M
r W
m :;-
u
O a c 0C: 0 0
tw : 3 m
4' C
cu
0 C:
0 0
E
4)
E E E
x
a) W Q) 4)
z E E E E
C:

GJ m 0S
E fn
E
0 1E
E2
0)
C) 00
a
0 3:
0) m
E cD
OZ
N
E
D
E
a) o a7 O 5- 4)
CL U) w
CN
4 co
CIA
CD
eq04
cm L. 4)0N cm
E
CL
U)
U.
0 CL
CL
m
0 41
0 QI
cr
0 4-
u
CL
kn
0; tw
4- m
0-
c

4.01 mu
0 m
0 LL
bD
a
V)
0 0
ai41
UA
E
4-01
LU
Item  E. 1.

DATE 07/24/2025
TO Honorable Mayor and City Council Members
FROM Tonya Connolly, Maintenance Superintendent
SUBJECT    Hearing to consider property owners' objections and adopt a resolution confirming the Superintendent of Streets' Report concerning weed abatement assessments
SUMMARY AND RECOMMENDATION
The City of Newark conducts an annual weed abatement program as a fire prevention measure.  This is a combined effort between the City's Maintenance Division and the Alameda County Fire Department Fire Prevention staff.  Vacant properties with the potential for extensive weed growth are typically included in the program and property owners have the option to either complete the weed abatement work themselves or have the work completed by a City contractor.  Following notification, property owners cleared 102 parcels and the remaining 18 parcels were cleared by the City's contractor.  The properties cleared by the City's contractor have a resulting range of assessments between $387 and $2,907.  The combined total for all assessments was $16,376.

Staff recommends that the City Council, by motion, act upon any objections by property owners for assessments on their parcels for the 2025 Weed Abatement Program and, by resolution, confirm the Superintendent of Streets Report concerning weed abatement assessments.

BACKGROUND
The City of Newark conducts an annual weed abatement program to abate weeds on vacant properties that are not properly maintained by property owners to the satisfaction of Alameda County Fire Department (ACFD) Fire Prevention staff.  The program is authorized by, and conducted pursuant to, Government Code Sections 39560, et seq. The abatement work typically consists of tractor mowing, supplemented with manual labor to clear weeds abutting fences and removal of debris to facilitate tractor work.  Property owners have the option to make their own arrangements for weed and debris removal.  All properties on which the City performs the abatement work would be assessed the full cost of that work, including administrative costs.

Administrative costs are 20% of the cost of the weed abatement services pursuant to the adopted Master Fee Schedule.  Prior to abatement, there were approximately 120 industrial, residential and commercial parcels that had large areas of vacant ground with regular seasonal weed growth that could have developed into a fire hazard if not properly maintained.

DISCUSSION/ANALYSIS
The Superintendent of Streets' report on the 2025 Weed Abatement program is submitted pursuant to Resolution No. 11741 adopted by the City Council on May 8, 2025.  The report showing the assessments for the spring 2025 weed abatement has been posted as required.  Owners whose properties are subject to an assessment may protest at this meeting or submit their objections prior to the hearing.  As of June 16, 2025, no written objections have been received.  On June 12, 2025, the City Council directed the Superintendent of Streets to abate weeds on 120 parcels, of which 18 were ultimately cleared by the City's contractor.  This year, the assessments ranged from $387 and $2,907.  The lowest cost was for a vacant property that required minimal work.  The combined total for all assessments, including administrative fees, was $16,376.  All work completed through the 2025 Weed Abatement Program is paid for through the proposed assessments.

FISCAL IMPACT
Abatement costs are fully recoverable through property assessments, which are collected via the Alameda County tax roll, resulting in no net impact on the General Fund.

REVIEW AND APPROVAL
Prepared by - Tonya Connolly, Maintenance Superintendent Reviewed by - Howard Young, Public Works Director
Reviewed by - Krysten Lee, Finance Director
Reviewed by - Kristopher J. Kokotaylo, City Attorney
Approved by - David J. Benoun, City Manager
Attachments
Resolution - Total Assessments
Schedule A - Weed Abatement - Total Assessments
(TCR1)
RESOLUTION NO.

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

NEWARK CONFIRMING THE REPORT OF THE

SUPERINTENDENT OF STREETS CONCERNING WEED

ABATEMENT ASSESSMENTS AND APPROVING SPECIAL

ASSESSMENTS
WHEREAS, the City Council of the City of Newark, by Resolution 11741, ordered certain rubbish, refuse, dirt, and weeds to be abated in the manner provided by Sections 39560 and 39586 inclusive, of the Government Code of the State of California; and WHEREAS, the Superintendent of Streets has caused said rubbish, refuse, dirt, and weeds to be abated. Nuisances abated and an accounting for the cost of abatement in front of or on each separate parcel of land has been set forth in a report entitled “Exhibit A – 2025 City of Newark Weed Abatement – Total Assessments” and attached hereto.

NOW, THEREFORE, BE IT RESOLVED that the report of the Superintendent of Streets attached hereto and made a part hereof as Exhibit A is hereby confirmed.

BE IT FURTHER RESOLVED that the cost of abating the nuisance for each respective parcel is set forth in said report under the column entitled “Total Assessment”.

BE IT FURTHER RESOLVED that there is hereby levied a special assessment against each parcel of land described in said report in the amount of $16,376 as shown in said column “Total Assessment”.

BE IT FURTHER RESOLVED that the costs levied as a special assessment against the parcels of land described in said report shall become a lien upon the property. (TCR1)
I HEREBY CERTIFY the foregoing resolution was introduced at a regular meeting of the City Council of the City of Newark held on _________________, by Council Member ____________________ who moved its adoption and passage, which motion was carried after being duly seconded, and passed by the following vote:

AYES:

NOES:

ABSENT:

SECONDED:

APPROVED:
s/Michael K. Hannon
ATTEST: Mayor
s/SHEILA HARRINGTON
City Clerk
APPROVED AS TO FORM:
s/KRISTOPHER J. KOKOTAYLO
City Attorney
The undersigned City Clerk of the City of Newark hereby certifies and attests that the undersigned has access to the official records of the City Council of the City of Newark, that the foregoing resolution was duly adopted by said City Council of the City of Newark at a meeting of said City Council and that such resolution has not been amended or altered and are in full force and effect on the date stated above.
________________________
Sheila Harrington, City Clerk, City of Newark
________________________
Date

MAP SORT PARCEL ALCO APN LOCATION
MOWING
HOURS
TOTAL

ASSESSMENT
3 092 013100109 92-131-1-9 FILBERT STREET AT SNOW 4 $387.60

3.1 092 013100204 92-131-2-4 37243 FILBERT STREET 4 $387.60

3.2 092 013100300 92-131-3 37257 FILBERT STREET 4 $387.60 8 092 003001403 92-30-14-3 6717 THORNTON AVENUE 8 $775.20

11.39 092A200000400 92A-2000-4 SP RAILROAD R-O-W 8 $775.20

11.42 092 012702000 92-127-20 SP RAILROAD R-O-W 16 $1,550.40 15 537 046000725 537-460-7-25 6953 JARVIS AVENUE 6 $581.40 24 092 007500402 92-75-4-2 CHERRY STREET 4 $387.60

24.1 092 007500502 92-75-5-2 CHERRY STREET 4 $387.60
34 092 012601900 92-126-19 SMCTD RAILROAD R-O-W LOCUST & ELM 30 $2,907.00 35 537 085202800 537-852-28 8891 ENTERPRISE DR 9 $872.10 35 537 085202900 537-852-29 8891 ENTERPRISE DR 9 $872.10 36 092 011501100 92-115-11-3 37445 WILLOW STREET 18 $1,744.20 45 092 012501000 92-125-10 7843 RAILROAD AVE BETWEEN LOCUST & WALNUT 8 $775.20 53 092A103603102 92A-1036-31-2 6152 THORNTON AVENUE 8 $775.20 65 092 012701300 92-127-13 37079 ASH ST 4 $387.60
68 092 014000500 92-140-5 8333 ENTERPRISE DR 12 $1,162.80 71 092 010001103 92-100-11-3 THORNTON AVE 8 $775.20
72 092 005200400 92-52-4 THORNTON AVE 5 $484.50
TOTALS 169 $16,376.10
2025 Weed Abatement - Schedule A - Total Assessments
Item  E. 2.

DATE 07/24/2025
TO Honorable Mayor and City Council Members
FROM Joseph Balatbat, Associate Planner
SUBJECT    Hearing to consider a Call for Review of the Planning Commission’s adoption of Resolution No. 2022 approving the Prologis project at 6756 – 6792 Central Avenue (APN:
92A-2165-14, -15, -16, and -17) consisting of the following entitlements: Design Review (DR2022-010), a Minor Use Permit (MUP2024-001), and a Conditional Use Permit (U2024-001) to allow for a new industrial building and associated on-site improvements and consider a resolution affirming the Planning Commission's action and a resolution overturning the Planning Commission's action
SUMMARY AND RECOMMENDATION
The applicant, Ryan Marshall, and property owner, Prologis LP, (the "Applicant") submitted an application for a new industrial building and associated on-site improvements at 6756 – 6792 Central Avenue (the “Project”). The requested entitlements include the following:

Design Review (DR2022-010) for the construction of a new industrial building and associated on-site improvements. Pursuant to Newark Municipal Code ("NMC") §17.34.020, Design Review is required for all projects that require a permit for new construction, reconstruction, rehabilitation, alteration, or other improvements to the exterior of a structure, site, or a parking area;

1. Conditional Use Permit (U2024-001) to allow for an “indoor warehousing and storage” use and a “wholesaling and distribution” use. Pursuant to NMC §17.09.020, an “indoor warehousing and storage” use and a “wholesaling and distribution” use require approval of a Conditional Use Permit; and

2. Minor Use Permit (MUP2024-001) to allow for an additional height increase to the new prefinished vertical tube steel fencing to be 6 feet tall within the minimum required 10-foot front setback area. Pursuant to NMC §17.17.040(A)(2), an additional height increase for fencing requires approval of a Minor Use Permit.

3. On June 24, 2025, the Planning Commission voted 5-0 to approve the Project and adopted Resolution 2022 (the "Resolution), based upon the findings contained in the Resolution and subject to conditions of approval.

Staff sent a Notice of Action describing the decision to the members of the City Council and Planning Commission, the Applicant, all property owners within a minimum 1,000-foot radius of the Project site, all neighborhood and community organizations that filed a written request for notice of projects in the area where the site is located, and all persons and groups who have filed a written request for notice regarding the specific application.

Pursuant to NMC §17.31.100, a member of the City Council may submit a "Call for Review" of a decision of the Community Development Director, Zoning Administrator, or Planning Commission. Council Member Grindall requested a review of the Planning Commission’s decision to adopt the Resolution.

Staff recommends that the City Council consider one of the following actions:

Affirm the Planning Commission’s decision to adopt the Resolution (Attachment 3) without any modifications to project approvals;

1. Affirm the Planning Commission’s decision to adopt the Resolution with changes to the Project, the required findings of fact, and/or the conditions of approval; or

2. Reject the Planning Commission’s decision, thereby denying the Project based on an inability to make the necessary findings for approval.

3. Staff recommends that the City Council affirm the Planning Commission's Resolution without any modifications to the project approvals. However, if the City Council seeks to overturn the Planning Commission's decision, staff has provided a draft resolution (Attachment 5). The draft resolution includes a space for the City Council to identify where it was unable to make the necessary findings to approve the Project.

BACKGROUND
The subject site consists of four parcels, with a combined lot size of 17.4 acres.

Previous uses on the site include, but are not limited to, a recycling center, glass manufacturer, and pallet storage yard. The subject site consists of an existing warehouse building, uncovered storage yards, fencing, and hardscaped areas.

The subject site is zoned GI: General Industrial and has a General Plan Land Use designation of General Industrial and is primarily surrounded by industrial uses.

Project Description
The Project consists of a new industrial building and associated on-site improvements at 6756 – 6792 Central Avenue. The new industrial building is considered a speculative building with no tenants currently identified. The new industrial building would be approximately 315,390 square feet, which includes 33,806 square feet of office space and 281,584 square feet of industrial space.

A complete overview of the Project can be found as part of Staff's report for the Planning Commission meeting (Attachment 1).

DISCUSSION/ANALYSIS
The General Industrial General Plan designation is intended to accommodate a broad range of manufacturing, warehousing, wholesaling, and distribution uses. This designation is implemented through the GI: General Industrial Zoning District.

The Project was reviewed under NMC Title 17 (Zoning) and complies with the applicable provisions of the Zoning Code, which include building height, setback, parking and loading, and fencing requirements.

The Project is subject to the Design Review criteria specified in NMC §17.34.060, Conditional Use Permit findings specified in NMC §17.35.060, and Minor Use Permit findings specified in NMC §17.35.060 and NMC §17.17.040(A)(1)(a)(ii). Overall, the Project would enhance the site and is compatible with the characteristics of the surrounding areas. The new industrial building consists of contemporary design elements with high-quality materials and clean forms that create an attractive building within the site. The Project would be complementary to the site and would enhance the appearance and features of the surrounding natural and built environment.

CONDITIONAL USE PERMIT
The applicant is requesting approval of a Conditional Use Permit for an “indoor warehousing and storage” use and a “wholesaling and distribution” use. The Project would be consistent with the type of uses found in the GI Zoning District. Therefore, the Project would be consistent with the Conditional Use Permit findings. As mentioned earlier in this report, the applicant has not identified a tenant to occupy the new industrial building.

The applicant has submitted a Transportation Impact Study to analyze traffic impacts for the Project and various industrial uses. The study has been prepared to determine the Vehicle Miles Traveled (VMT) and Level of Service (LOS) impacts associated with the Project. It included an analysis of trip generation for trucks and vehicles, impacts, mitigations, and recommendations. The study states that the Project's VMT to employee ratio of 14.02 is expected to be lower than the threshold of significance ratio for VMT to employee ratio of 14.6, and as a result, the project is determined to have a less-than-significant transportation impact.

As part of the Engineering Division’s conditions of approval, the applicant would incorporate LOS mitigation measures specified in the study, which include signal phasing adjustments at the northbound left lane at the Cherry Street and Central Avenue intersection to address the queuing deficiency.

Dock Doors
As part of the conditions of approval, the applicant would  revise the Project plans to include the 32 dock doors with two grade-level doors and 14 door knockouts as part of the building permit submittal. It should be noted that as part of the project's conditions of approval, any changes to the design of the new industrial building that include the conversion of the additional door knockouts to dock doors for an “indoor warehousing and storage” use and/or a “wholesaling and distribution” use would require an amendment to the Conditional Use Permit.

Overall, the Project would be compatible with the surrounding industrial uses in the nearby area.

DESIGN REVIEW
Industrial Building
The design of the new industrial building would be a contemporary style design consisting of high-quality tilt-up concrete with metal panel accents. The location of the new building would be in the center of the property.  The new building would be predominantly single-story, with the exception of a two-story office. The overall exterior height of the new building would be 49’-6”, to the top of the parapet. Design elements and architecture features would include:
•    Tilt-up panels to be painted in three different colors. •    Perforated metal panel shading device.
•    Prefinished aluminum window frame and glazing.
•    Prefinished metal canopy above entry.
•    Prefinished aluminum curtain wall and glazing.
•    Prefinished aluminum storefront and glazing.
•    Roof mechanical screen.
•    Spandrel glazing.
•    Exterior wall-mounted building light fixtures.
•    Cast-in-place concrete stairs.
•    Access doors.
•    Roll-up doors.

The Project plans display the exterior colors and materials used on the new industrial building. Additionally, the Project plans include a placeholder for a public art installation at the front (north) elevation of the new building that faces Central Avenue.

On-Site Improvements
The Project would include new landscape areas, walkways, driveways, drive aisles, parking areas, bicycle parking areas, bioretention areas, an employee open space area, site lighting, fencing, vehicular gates, a truck courtyard area, and a trailer storage area.

The new landscaping would include trees, shrubs, perennials, grasses, and ground cover plants. The applicant proposes to remove ten existing trees on the site to accommodate the new on-site improvements.

Two new driveways would be created along the front (northwestern) of the property to provide access to the site and parking areas. As indicated in the Transportation Impact Study, prepared by Kimley Horn dated May 2025, the driveway at the west of the Project site along Central Avenue would be for “passenger car access only”. The driveway at the east of the Project site along Central Avenue would be for “truck access only”.

Pedestrian walkways would be provided along the parking areas, bicycle parking areas, Pedestrian walkways would be provided along the parking areas, bicycle parking areas, and the new industrial building. Sidewalks would be proposed along the project frontage on Central Avenue. As part of the Planning Division’s and Engineering Division’s conditions of approval, the applicant would need to revise the Project plans to show the design of the sidewalk along the property frontage on Central Avenue as part of the building permit submittal.

New site lighting would also be provided along the perimeter of the property. The rear (eastern) of the property, behind the new industrial building, would consist of a truck courtyard area and trailer storage area. The Project would provide a total of 396 on-site parking spaces, which would meet the minimum required number of on-site parking spaces as outlined in Chapter 17.23 – Parking and Loading.

An employee open space area would be provided along the front of the new industrial building. The employee open space area would include an outdoor cooking area, table and seating area, hardscaping, and landscaping. A 6-foot-tall perforated metal panel steel frame fencing, painted cement board wall, and amenity entrance gates would be installed around the new employee open space area.

MINOR USE PERMIT
Pursuant to NMC §17.17.040(A)(2), an additional height increase for fencing in non-residential districts requires approval of a Minor Use Permit. The applicant is requesting approval of a Minor Use Permit to allow for an additional height increase to the new prefinished vertical tube steel fencing to be 6 feet tall within the minimum required 10-foot front setback area. The new fencing would be located along the side (southern) property line adjacent to the Union Pacific Railroad. Overall, the additional fence height request would comply with the fencing standards outlined in NMC §17.17.040 -  Fences and Freestanding Walls, which include meeting the 6-foot height limitation and utilizing a tube steel material.

Parcel Map
The applicant will submit an application for a Parcel Map to merge the four parcels into one parcel for review and approval by the City Engineer, separately from the review of the requested entitlements. As part of the Engineering Division’s conditions of approval, the Parcel Map to merge the four parcels into one would need to be recorded at the Alameda County Recorder’s Office prior to issuance of the building permit.

Public Art and Signage
As part of the Planning Division’s conditions of approval, the applicant would be required to work with Staff on the public art installation as part of the building permit submittal. The General Plan includes a policy to use public art to commemorate Newark's cultural diversity, history, and unique character. The public art installation would help enhance the aesthetics of the new industrial building since the site is along Central Avenue, an arterial road, and the future overpass project.

The applicant has submitted a Signage Package for the new building and site. As part of the Planning Division’s conditions of approval, the applicant would need to apply for a Sign Permit to the Planning Division for review and approval to demonstrate compliance with Chapter 17.25 – Signage Standards.

Based on Staff’s analysis, the Design Review criteria, Conditional Use Permit findings, and Minor Use Permit findings for the Project can be made in the affirmative and are provided in Attachment 3 of this report.

COMMUNITY MEETINGS
The applicant held two community meetings on the Project. Notices for the community meetings went out to property owners within a minimum 1,000-foot radius of the Project site and the homeowners’ association in the Bayside Newark area.

The first meeting was held on December 18, 2023, at the Silliman Community Activity Center. No members of the public attended the meeting. The other community meeting was held on January 21, 2025, at the Community Meeting Room in the Newark Library.

The applicants’ team, City Staff, and one member of the public attended the meeting.

The applicants’ team presented an overview of the Project. Prior to the meeting, Staff received written comments regarding sidewalk improvements along Central Avenue, the status and review of the California Environmental Quality Act (CEQA) analysis, and the timeframe and duration of construction.

Required Noticing
Pursuant to NMC §17.31.060, on July 8, 2025, a public hearing notice was published in The Tri City Voice and mailed to all property owners within a minimum 1,000-foot radius of the Project site, all neighborhood and community organizations that have filed a written request for notice of projects in the area where the site is located, and all persons and groups who have filed a written request for notice regarding the specific application.

FISCAL IMPACT
The project is not expected to negatively impact the City's budget. As described in NMC Chapter 3.24, the City has established fees that are imposed upon projects to mitigate the impacts that the projects have upon the City's ability to provide public facilities. Per the current Master Fee Schedule, the Project would be subject to the following impact and in-lieu fees as described in the table below. In addition, the project would be required to pay the Community Development Maintenance Fee, which is

0.5% of the construction valuation.

Total Building SF 315,390 SF
Public Safety: $0.61 SF $192,387.90
Community Service/Facilities: $0.45 SF $141,925.50
Transportation: $5.93 SF $1,870,262.70
Housing Impact: $0.83 SF $261,773.70
Art in Public Places and Private Development: $0.21 SF $66,231.90 Grand Total $2,532,581.70
Grand Total $2,532,581.70
The applicant, property owners, and/or developer will be responsible for remitting the respective impact fees in effect at the time, prior to the issuance of any building permits for the Project. The collection of the impact fees is included in the conditions of approval.

ENVIRONMENTAL/PLANNING COMMISSION REVIEW
California Environmental Quality Act (CEQA)
Staff retained the consultant services of M-Group to determine if the Project is eligible for an exemption under the California Environmental Quality Act (CEQA). The CEQA analysis prepared by M-Group, dated June 2025, in accordance with the CEQA Guidelines evaluates the environmental impacts from the Project, included as Exhibit E of Resolution No. 2022 (Attachment 2). The analysis demonstrated that the Project is eligible for the following CEQA exemptions:

Consistency with Program EIR. The City of Newark 2013 FEIR provides for streamlining and/or tiering provisions under CEQA Guidelines Section 15168. This CEQA Analysis demonstrates that the Project would not result in substantial changes or involve new information that would warrant preparation of a subsequent EIR because the level of development proposed is within the development assumptions analyzed in the program level EIR (2013 FEIR). No further environmental review is required.

Community Plan Exemption. Streamlined environmental review per Section 15183 of the CEQA Guidelines and California Public Resources Code Section 21083.3. The Project is consistent with the General Plan and will not result in significant environmental impacts that were not previously identified as significant project-level, cumulative or offsite effects in the 2013 FEIR. The Project is exempt from further CEQA review since it is consistent with the General Plan.

As discussed in the analysis, the Project is within the scope of development projected under the General Plan for which an EIR was certified in 2013. The Project will implement applicable mitigation measures identified in the 2013 FEIR. In addition, the Project will be required to comply with applicable conditions of approval of the Resolution and is subject to uniformly applied development standards. With implementation of the required mitigation measures and conditions of approval, the Project will not result in a substantial increase in the severity or significant impacts that were previously identified in the program-level EIR, nor will the Project introduce any new significant impacts that were not previously identified. Therefore, there will be no additional environmental impacts beyond those analyzed in the 2013 FEIR.

Overall, the Project is exempt from further environmental review pursuant to CEQA Guidelines §15168 and §15183 and California Public Resources Code §21083.3.

Planning Commission Review
As described in NMC Chapter 17.30, the Planning Commission serves as the decision-making body for Conditional Use Permits. Requests for Design Review and Minor Use Permits may also be reviewed by the Planning Commission at the discretion Minor Use Permits may also be reviewed by the Planning Commission at the discretion of the Community Development Director.

On June 24, 2025, the Planning Commission received a staff recommendation for adoption of a resolution to approve the Applicant's requested entitlements. The Planning Commission held a public hearing to consider the staff recommendations and receive public comments. A member of the public, Mr. Stephen Cassidy, CEO of the Newark Chamber of Commerce, spoke in favor of the Project. At the conclusion of the public hearing, the Planning Commission considered the staff recommendation and information contained in the staff report, the public testimony received, and discussed the merits of the project.

Following the discussion, Commissioner Aguillar made a motion to approve the staff recommendation, which was seconded by Commissioner Becker. The Planning Commission voted 5-0 to approve the motion. Minutes of the June 24, 2025 Planning Commission meeting are provided in Attachment 4.

REVIEW AND APPROVAL
Prepared by - Joseph Balatbat, Associate Planner
Reviewed by - Steven Turner, Community Development Director Reviewed by - Krysten Lee, Finance Director
Reviewed by - Kristopher J. Kokotaylo, City Attorney
Approved by - David J. Benoun, City Manager
Attachments
Attachment 1A -June 24, 2025 PC Staff Report
Attachment 1B - Draft Resolution
Attachment 1C - Project Narrative
Attachment 1D - Project Plans
Attachment 1E - CEQA Analysis
Attachmment 1F - CEQA Appendix A
Attachment 1G - CEQA Geotech Report
Attachment 1H - CEQA Appendix C-1
Attachment 1I - CEQA C-2
Attachment 1J - CEQA Appendix D-1
Attachment 1K - CEQA Appendix D-2
Attachment 1L - CEQA Appendix E
Attachment 1M - Concept Plan
Attachment 1N - Fire Truc Exibit
Attachment 1O - Signage Package
Attachment 2 – Planning Commission Resolution No. 2022 (with Exhibit A & B only) Attachment 3 – Draft Resolution – Affirming the Planning Commission’s Decision of Approval of the Project
Attachment 4 - Planning Commission Minutes July 24th
Attachment 5 – Draft Resolution – Overturning the Planning Commission’s Decision of Approval of the Project
Staff Presentation
Planning Commission Meeting June 24, 2025
City of Newark PLANNING COMMISSION MEMO
E.1 Hearing to consider DR2022-010, U2024-001, and MUP2024-001, a Resolution approving a Design Review, Conditional Use Permit, and Minor Use Permit to allow for a new industrial building and associated on-site improvements at 6756 – 6792 Central Avenue (APN: 92A-2165-14, -15, -16, and -17). The subject site is zoned GI:

General Industrial and has a General Plan designation of General Industrial – from Associate Planner Joseph Balatbat.
(RESOLUTION)

EXECUTIVE SUMMARY
The applicant, Ryan Marshall, and property owner, Prologis LP, submitted an application for a new industrial building and associated on-site improvements at 6756 – 6792 Central Avenue (the “Project”). The requested entitlements include the following:

1. Design Review (DR2022-010) for the construction of a new industrial building and associated on-site improvements. Pursuant to Newark Municipal Code (NMC) §17.34.020, Design Review is required for all projects that require a permit for new construction, reconstruction, rehabilitation, alteration, or other improvements to the exterior of a structure, site, or a parking area;

2. Conditional Use Permit (U2024-001) to allow for an “indoor warehousing and storage” use and a “wholesaling and distribution” use. Pursuant to NMC §17.09.020, an “indoor warehousing and storage” use and a “wholesaling and distribution” use require approval of a Conditional Use Permit; and

3. Minor Use Permit (MUP2024-001) to allow for an additional height increase to the new prefinished vertical tube steel fencing to be 6 feet tall within the minimum required 10-foot front setback area. Pursuant to NMC §17.17.040(A)(2), an additional height increase for fencing requires approval of a Minor Use Permit.

Staff recommends that the Planning Commission consider the following action:

1. Adopt the Draft Resolution, approving the Design Review (DR2022-010), Conditional Use Permit (U2024-001), and Minor Use Permit (MUP2024-001) for the Project based on the findings provided in Attachment 1, Draft Resolution.

PROJECT BACKGROUND AND OVERVIEW
Property Description
The subject site consists of four parcels, with a combined lot size of 17.4 acres (756,061 square feet). Previous uses on the site include, but are not limited to, a recycling center, glass manufacturer, and pallet storage yard. The subject site consists of an existing warehouse building, uncovered storage yards, fencing, and hardscaping.

Planning Commission Meeting June 24, 2025
The subject site is zoned GI: General Industrial and has a General Plan Land Use designation of General Industrial. The subject site is bounded by Central Avenue, Cherry Street, Redeker Place, and the Union Pacific Railroad. The subject site is primarily surrounded by industrial uses.

Project Description
The Project consists of a new industrial building and associated on-site improvements at 6756 – 6792 Central Avenue (Attachment 1, Exhibit D). In the Project Narrative, the applicant indicates:
“The Project is currently speculative in nature with no tenant prospects as of the application date. Our intent is to transform an underutilized industrial outdoor storage yard into a Class A, state of the art industrial warehouse with approximately 300 new permanent jobs”(Attachment 1, Exhibit C).

Below are the details of the Project and the requested entitlements:

Design Review
Industrial Building
The new industrial building would be approximately 315,390 square feet, which includes 33,806 square feet of office space and 281,584 square feet of industrial space with 46 dock doors with two drive-in doors at the rear (south) elevation of the building. The design of the new industrial building would be a contemporary style design consisting of high-quality tilt-up concrete with metal panel accents. The location of the new building would be in the center of the property (Attachment 1, Exhibit D).

The new building would be predominantly single-story, with the exception of a two-story office.

The overall exterior height of the new building would be 49’-6”, to the top of the parapet. Design elements and architecture features would include:
• Tilt-up panels to be painted in three different colors. • Perforated metal panel shading device.
• Prefinished aluminum window frame and glazing.
• Prefinished metal canopy above entry.
• Prefinished aluminum curtain wall and glazing.
• Prefinished aluminum storefront and glazing.
• Roof mechanical screen.
• Spandrel glazing.
• Exterior wall-mounted building light fixtures.
• Cast-in-place concrete stairs.
• Access doors.
• Roll-up doors.

The Project plans display the exterior colors and materials used on the new industrial building (Attachment 1, Exhibit D). Additionally, the Project plans include a placeholder for a public art installation at the front (north) elevation of the new building that faces Central Avenue.

Detached Trash Enclosure
A new detached trash enclosure would be proposed along the southeastern side of the property.

The new trash enclosure would be 10 feet tall. The exterior colors and materials of the new trash Planning Commission Meeting June 24, 2025
enclosure would be similar to the new industrial building, which includes tilt-up concrete walls, perforated metal gate, corrugated metal roof, and a tube steel roof structure.

On-Site Improvements
The Project would include new landscape areas, walkways, driveways, drive aisles, parking areas, bicycle parking areas, bioretention areas, an employee open space area, site lighting, fencing, vehicular gates, a truck courtyard area, and a trailer storage area.

The new landscaping would include trees, shrubs, perennials, grasses, and ground cover plants (Attachment 1, Exhibit D). The applicant proposes to remove ten existing trees on the site to accommodate the new on-site improvements.

Two new driveways would be created along the front (northwestern) of the property to provide access to the site and parking areas (Attachment 1, Exhibit D). As indicated in the Transportation Impact Study, prepared by Kimley Horn dated May 2025, the driveway at the west of the Project site along Central Avenue would be for “passenger car access only”. The driveway at the east of the Project site along Central Avenue would be for “truck access only” (Attachment 1, Exhibit E).

Pedestrian walkways would be provided along the parking areas, bicycle parking areas, and the new industrial building. Sidewalks would be proposed along the project frontage on Central Avenue. As part of the Planning Division’s and Engineering Division’s conditions of approval, the applicant would need to revise the Project plans to show the design of the sidewalk along the property frontage on Central Avenue as part of the building permit submittal.

New site lighting would also be provided along the perimeter of the property. The rear (eastern) of the property, behind the new industrial building, would consist of a truck courtyard area and trailer storage area. The Project would provide a total of 396 on-site parking spaces, which would meet the minimum required number of on-site parking spaces as outlined in Chapter 17.23 – Parking and Loading.

An employee open space area would be provided along the front of the new industrial building.

The employee open space area would include an outdoor cooking area, table and seating area, hardscaping, and landscaping. A 6-foot-tall perforated metal panel steel frame fencing, painted cement board wall, and amenity entrance gates would be installed around the new employee open space area.

New fencing would be installed along the perimeter of the site, which includes:
• 3-foot-tall prefinished vertical tube steel fencing.
• 6-foot-tall prefinished vertical tube steel fencing.
• 6-foot-tall chain link fencing.
• 6-foot-tall combination retaining wall with chain-link fencing above.

The new chain-link fencing would be located along the back side and rear of the property, which would not be visible from Central Avenue. The Project plans show new chain link fencing along a portion of the front (southwestern) property line. As part of the Planning Division’s conditions of approval, the applicant would need to revise the Project plans to remove the new chain link fencing along the front (southwestern) property line as part of the building permit submittal.

Planning Commission Meeting June 24, 2025
In addition to the new perimeter fencing, two new 6-foot-tall vehicle gates would be proposed.

The new vehicle gates would be of tube steel material and would be installed along both sides of the property. Sheet CU-1.6 of the Project plans includes an illustration of the new fencing and vehicle gates (Attachment 1, Exhibit D).

Utilities and Easements
The Project would include the undergrounding of utilities, including tie-ins for stormwater, sewer, and water along Central Avenue.

New easements would be dedicated as part of the Project. Sheet EX2 of the Project Plans (Attachment 1, Exhibit D) shows the easements; however, the applicant will work with the City Engineer to ensure any other necessary easements are required for the Project to the satisfaction of the City Engineer. The City Engineer will review the dedicated easements for approval. As part of the Engineering Division’s conditions of approval, the applicant would need to submit the Plat and Legal Descriptions for the dedicated easements to the City Engineer for review and approval.

The proposed easements would include easements necessary for the future overpass project.

The City of Newark is in the process of developing plans to construct an overpass along Central Avenue above the Union Pacific Railroad and in front of the Project site. The overpass would extend across approximately 75% of the Project’s frontage.

Conditional Use Permit
As proposed, the new industrial building is considered a speculative building with no tenants. The Project Narrative stated, “Prologis, the Project Sponsor and Owner of the property, is proposing to demolish approximately 113,500 square feet of obsolete industrial buildings on site to construct a new industrial warehouse facility that can accommodate numerous uses that meet both the City and Prologis’ interests” (Attachment 1, Exhibit C). Advanced manufacturing uses and Research and development uses are also permitted uses in the GI Zoning District.

The applicant is proposing to include other potential uses to occupy the new industrial building, including an “indoor warehousing and storage” use and a “wholesaling and distribution” use.

Pursuant to NMC §17.09.020, an “indoor warehousing and storage” use and a “wholesaling and distribution” use require approval of a Conditional Use Permit. Therefore, the applicant is requesting approval of a Conditional Use Permit to allow such uses.

Although there is currently no tenant to occupy the new industrial building, the Project would be consistent with the type of uses found in the GI Zoning District. A Transportation Impact Study has been prepared to determine potential Vehicle Miles Traveled (VMT) impacts and/or Level of Service (LOS) deficiencies associated with the Project (Attachment 1, Exhibit E) and is further explained in the Analysis/Discussion section of this report.

Overall, the Project would be compatible with the surrounding industrial uses in the nearby area.

Minor Use Permit
Pursuant to NMC §17.17.040(A)(2), an additional height increase for fencing in non-residential districts requires approval of a Minor Use Permit. The applicant is requesting approval of a Minor Use Permit to allow for an additional height increase to the new prefinished vertical tube steel Planning Commission Meeting June 24, 2025
fencing to be 6 feet tall within the minimum required 10-foot front setback area. The new fencing would be located along the side (southern) property line adjacent to the Union Pacific Railroad.

To obtain approval of a Minor Use Permit, the additional fence height request would need to comply with the following material standards pursuant to NMC §17.17.040(A)(1)(a)(i)(3). Also, the additional fence height request would need to meet the required findings pursuant to NMC §17.17.040(A)(1)(a)(ii) and NMC §17.35.060.

Overall, the additional fence height request would comply with the fencing standards outlined in NMC §17.17.040 - Fences and Freestanding Walls, which include meeting the 6-foot height limitation and utilizing a tube steel material.

ANALYSIS/DISCUSSION
Generally, the General Industrial General Plan designation is intended to accommodate a broad range of manufacturing, warehousing, wholesaling, and distribution uses. This designation is implemented through the GI: General Industrial Zoning District.

The Project was reviewed under NMC Title 17 (Zoning) and complies with the applicable provisions of the Zoning Code, which include but are not limited to the height requirement, setback requirements, parking and loading requirements, and fencing requirements.

The Project is subject to the Design Review criteria specified in NMC §17.34.060, Conditional Use Permit findings specified in NMC §17.35.060, and Minor Use Permit findings specified in NMC §17.35.060 and NMC §17.17.040(A)(1)(a)(ii). Exhibit A - Findings of Fact of the Draft Resolution (Attachment 1) includes responses to how the Project meets the required criteria and findings for the entitlements. Overall, the Project, if approved, enhances the site and is compatible with the characteristics of the surrounding areas. The new industrial building consists of contemporary design elements with high-quality materials and clean forms that create an attractive building within the site. The Project would be complementary to the site and would enhance the appearance and features of the surrounding natural and built environment.

Dock Doors
Since the Project consists of a speculative building with no tenant, Staff believes that it is necessary to address the proposed number of dock doors to ensure that the Planning Commission can make the necessary findings for approval. Specifically, a building with 46 dock doors may promote a “indoor warehousing and storage” use and a “wholesaling and distribution” use, rather than advance manufacturing and research and development uses. In response, the applicant provided a Conceptual Plan (Marketing Plan) showing 32 dock doors with two grade-level doors and 14 door knockouts, which Staff believes allows the Planning Commission to make the findings for approval (Attachment 2). As part of the Planning Division’s conditions of approval, the applicant would need to revise the Project plans to show the 32 dock doors with two grade-level doors and 14 door knockouts as part of the building permit submittal. It should be noted that as part of the Planning Division’s conditions of approval, any changes to the design of the new industrial building that include the conversion of the additional door knockouts to dock doors for an “indoor warehousing and storage” use and/or a “wholesaling and distribution” use would require Planning Commission review and approval.

Conditional Use Permit
Planning Commission Meeting June 24, 2025
As mentioned earlier in this report, the applicant has not identified a tenant to occupy the new industrial building. The applicant is requesting approval of a Conditional Use Permit for an “indoor warehousing and storage” use and a “wholesaling and distribution” use. The Project would be consistent with the type of uses found in the GI Zoning District. Therefore, the Project would be consistent with the Conditional Use Permit findings as further explained in Attachment 1 of this report.

The applicant has submitted a Transportation Impact Study to analyze traffic impacts for the Project and for various industrial uses. The Transportation Impact Study has been prepared to determine potential Vehicle Miles Traveled (VMT) impacts and/or Level of Service (LOS) deficiencies associated with the Project (Attachment 1, Exhibit E). The Transportation Impact Study included analysis of, but not limited to, trip generation for trucks and vehicles, impacts, mitigations, deficiencies, and recommendations.

The Transportation Impact Study indicates that “the project VMT/employee ratio (14.02) is expected to be lower than the threshold of significance ratio for VMT/employee (14.6) and as a result the project is determined to have a less than significant transportation impact” (Attachment 1, Exhibit E).

As part of the Engineering Division’s conditions of approval, the applicant would need to follow the mitigation measures specified in the Transportation Impact Study, which includes signal phasing to address the queuing deficiency at the northbound left lane at the Cherry Street and Central Avenue intersection.

Overall, the Project would be compatible with the surrounding industrial uses in the nearby area.

Parcel Map
The applicant will submit an application for a Parcel Map to merge the four parcels into one parcel for review and approval by the City Engineer, separately from the review of the requested entitlements. As part of the Engineering Division’s conditions of approval, the Parcel Map to merge the four parcels into one would need to be recorded at the Alameda County Recorders’ Office prior to issuance of the building permit.

Public Art and Signage
As part of the Planning Division’s conditions of approval, the applicant would be required to work with Staff on the public art installation as part of the building permit submittal. The General Plan includes a policy to use public art to commemorate Newark's cultural diversity, history, and unique character. The public art installation would help enhance the aesthetics of the new industrial building since the site is along Central Avenue, an arterial road, and the future overpass project.

The applicant has submitted a Signage Package for the new building and site (Attachment 4). As part of the Planning Division’s conditions of approval, the applicant would need to apply for a Sign Permit to the Planning Division for review and approval to demonstrate compliance with Chapter 17.25 – Signage Standards.

Based on Staff’s analysis, the Design Review criteria, Conditional Use Permit findings, and Minor Use Permit findings for the Project can be made in the affirmative and are provided in Attachment 1 of this report.

Planning Commission Meeting June 24, 2025

COMMUNITY MEETINGS
The applicant held two community meetings on the Project. Notices for the community meetings went out to property owners within a minimum 1,000-foot radius of the Project site and the homeowners’ association in the Bayside Newark area.

The first meeting was held on December 18, 2023, at the Silliman Community Activity Center.

No members of the public attended the meeting.

The other community meeting was held on January 21, 2025, at the Community Meeting Room in the Newark Library. The applicants’ team, City Staff, and one member of the public attended the meeting. The applicants’ team presented an overview of the Project. Prior to the meeting, Staff received written comments regarding sidewalk improvements along Central Avenue, the status and review of the California Environmental Quality Act (CEQA) analysis, and the timeframe and duration of construction.

PLANNING COMMISSION REVIEW
The entitlements for the Project include:

1. Design Review (DR2022-010) for the construction of a new industrial building and associated on-site improvements. Pursuant to NMC §17.34.020, Design Review is required for all projects that require a permit for new construction, reconstruction, rehabilitation, alteration, or other improvements to the exterior of a structure, site, or a parking area;

2. Conditional Use Permit (U2024-001) to allow for an “indoor warehousing and storage” use and a “wholesaling and distribution” use. Pursuant to NMC §17.09.020, an “indoor warehousing and storage” use and a “wholesaling and distribution” use require approval of a Conditional Use Permit; and

3. Minor Use Permit (MUP2024-001) to allow for an additional height increase to the new prefinished vertical tube steel fencing to be 6 feet tall within the minimum required 10-foot front setback area. Pursuant to NMC §17.17.040(A)(2), an additional height increase for fencing requires approval of a Minor Use Permit.

When conducting Design Review, the Planning Commission shall evaluate projects to ensure that they satisfy the criteria in NMC §17.34.060 to the extent that they apply. Also, the Planning Commission shall approve or conditionally approve the Conditional Use Permit request based on the findings required by NMC §17.35.060. Lastly, the Planning Commission shall approve or conditionally approve the Minor Use Permit request based on the findings required by NMC §17.35.060 and NMC §17.17.040(A)(1)(a)(ii).

The inability to make one or more of the findings is grounds for denial of an application. Based on Staff’s analysis, the Design Review criteria, Conditional Use Permit findings, and Minor Use Permit findings for the Project can be made in the affirmative and are provided in Attachment 1 of this report.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
Staff retained the consultant services of M-Group to determine if the Project is eligible for an Planning Commission Meeting June 24, 2025
exemption under the California Environmental Quality Act (CEQA). The CEQA analysis prepared by M-Group, dated June 2025, in accordance with the CEQA Guidelines evaluates the environmental impacts from the Project, included as Attachment 1, Exhibit E. The analysis demonstrated that the Project is eligible for the following CEQA exemptions:
• Consistency with Program EIR. The City of Newark 2013 FEIR provides for streamlining and/or tiering provisions under CEQA Guidelines Section 15168. This CEQA Analysis demonstrates that the Project would not result in substantial changes or involve new information that would warrant preparation of a subsequent EIR because the level of development proposed is within the development assumptions analyzed in the program level EIR (2013 FEIR). No further environmental review is required. • Community Plan Exemption. Streamlined environmental review per Section 15183 of the CEQA Guidelines and California Public Resources Code Section 21083.3. The Project is consistent with the General Plan and will not result in significant environmental impacts that were not previously identified as significant project-level, cumulative or offsite effects in the 2013 FEIR. The Project is exempt from further CEQA review since it is consistent with the General Plan.

As discussed in the analysis, the Project is within the scope of development projected under the General Plan for which an EIR was certified in 2013. The Project will implement applicable mitigation measures identified in the 2013 FEIR. In addition, the Project would be required to comply with applicable conditions of approval (Attachment 1, Exhibit B) and is subject to uniformly applied development standards. With implementation of required mitigation measures and conditions of approval, the Project would not result in a substantial increase in the severity or significant impacts that were previously identified in the program level EIR, nor would the Project introduce any new significant impacts that were not previously identified. Therefore, there would be no additional environmental impacts beyond those analyzed in the 2013 FEIR.

Overall, the Project is exempt from further environmental review pursuant to CEQA Guidelines §15168 and §15183 and California Public Resources Code §21083.3.

REQUIRED NOTICING
Pursuant to NMC §17.31.060, §17.34.070, and §17.35.050, on June 10, 2025, a public hearing notice was published in The Tri City Voice and mailed to all property owners (i.e., 70 property owners) within a minimum 1,000-foot radius of the Project site, all neighborhood and community organizations that have filed a written request for notice of projects in the area where the site is located, and all persons and groups who have filed a written request for notice regarding the specific application. The City has not received any written correspondence on this project as of the writing of this report. Any communications received prior to the public hearing will be forwarded to the Planning Commission and made available to the applicant and public.

PLANNING COMMISISON ACTION
Staff requests the Planning Commission to consider the following action:

1. Adopt the Draft Resolution, approving the Design Review (DR2022-010), Conditional Use Permit (U2024-001), and Minor Use Permit (MUP2024-001) for the Project based on the findings provided in Attachment 1, Draft Resolution.

Planning Commission Meeting June 24, 2025
Attachments

1. Draft Resolution
Exhibit A – Findings of Fact
Exhibit B – Conditions of Approval
Exhibit C – Project Narrative
Exhibit D – Project Plans
Exhibit E – CEQA Analysis

2. Conceptual Plan (Marketing Plan)

3. Fire Truck Exhibit

4. Signage Package
Resolution No. ______ 1 of 30
DR2022-010, U2024-001, and MUP2024-001
RESOLUTION NO. ______

RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF NEWARK APPROVING DR2022-010, U2024-001,
AND MUP2024-001, A DESIGN REVIEW, CONDITIONAL USE

PERMIT, AND MINOR USE PERMIT FOR A NEW

INDUSTRIAL BUILDING AND ASSOCIATED ON-SITE
IMPROVEMENTS AT 6756 – 6792 CENTRAL AVENUE (APN:
92A-2165-14, -15, -16, AND -17)
WHEREAS, Ryan Marshall, (the “Applicant”) and Prologis LP (the “Property Owner”), filed with the City of Newark an application for a Design Review, Conditional Use Permit, and Minor Use Permit for a new industrial building and associated on-site improvements at 6756 – 6792 Central Avenue (APN 92A-2165-14, -15, -16, and -17) (the “Project”); and WHEREAS, the property at 6756 – 6792 Central Avenue (the “Project site”) has a combined lot size of approximately 756,061 square feet (17.4 acres) and has a General Plan LandUse designation of General Industrial and is currently zoned GI: General Industrial; and WHEREAS, the Applicant and Property Owner seek a Design Review, which pursuant to Newark Municipal Code (NMC) §17.34.020 is required for all projects that require a permit for new construction, reconstruction, rehabilitation, alteration, or other improvements to the exterior of a structure, site, or a parking area. Approval of the Design Review requires the Project to meet the Design Review criteria pursuant to NMC §17.34.060 to the extent that they apply; and WHEREAS, the Applicant and Property Owner seek a Conditional Use Permit, which pursuant to NMC §17.09.020, an “indoor warehousing and storage” use and a “wholesaling and distribution” use requires approval of a Conditional Use Permit. Approval of the Conditional Use Permit requires the Project to meet all the following Use Permit findings pursuant to NMC §17.35.060; and
WHEREAS, the Applicant and Property Owner seek a Minor Use Permit, which pursuant to NMC §17.17.040(A)(2), an additional height increase to the new prefinished vertical tube steel fencing to be 6 feet tall within the minimum required 10-foot front setback area requires approval of a Minor Use Permit. Approval of the Minor Permit requires the Project to meet all the following Minor Use Permit findings pursuant to NMC §17.35.060 and NMC §17.17.040(A)(1)(a)(ii); and WHEREAS, a California Environmental Quality Act (the "CEQA") analysis was prepared as set forth in Exhibit E to evaluate the environmental impacts of the Project in accordance with the CEQA Guidelines. With implementation of the applicable mitigation measures identified in the Final Environmental Impact Report (FEIR) for the 2013 General Plan and conditions of approval as set forth in Exhibit B, the CEQA analysis determined and demonstrated that the Project is exempt from further environmental review pursuant to CEQA Guidelines Sections 15168 and 15183 and California Public Resources Code Section 21083.3 because the level of Resolution No. ______ 2 of 30
development proposed is within the development assumptions analyzed in the FEIR and the Project is consistent with the General Plan; and
WHEREAS, pursuant to NMC §17.31.060, §17.34.070, and §17.35.050, a public hearing notice was published in The Tri City Voice on June 10, 2025 and mailed as required for a public hearing, and the Planning Commission held a meeting on said application at 7:00 p.m. on June 24, 2025; and
WHEREAS, the Planning Commission held a public hearing on June 24, 2025, and fully considered the Project, entitlements, staff report, findings of fact, conditions of approval, public comments, and all other testimony and evidence presented at the public hearing; and WHEREAS, the Planning Commission finds that the staff report, exemptions from CEQA, and standards for approval reflect the City’s independent judgement and analysis of the Project; and
WHEREAS, the Planning Commission finds that the Project conforms with the City’s General Plan and Zoning Code for which are incorporated herein by reference and are available for review at City Hall during normal business hours and on the City’s website; and WHEREAS, the Planning Commission finds that the Project satisfies the requisite findings of fact necessary for approval of the Design Review, Conditional Use Permit, and Minor Use Permit as further explained in the staff report and the findings of fact associated with this Resolution, as identified in “Exhibit A” attached to this Resolution.

NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Newark as follows:

Section 1. That the forgoing recitals are true and correct and made part of this Resolution.

Section 2. That the Planning Commission hereby makes the necessary findings and determinations required by the NMC to approve the requested Design Review, Conditional Use Permit, and Minor Use Permit for the Project, as further explained in the staff report and findings of fact for approval as set forth in “Exhibit A” attached hereto and incorporated herein by this reference.

Section 3. Based on the findings and determinations, the Planning Commission hereby approves DR2022-010, U2024-001, and MUP2024-001, a Design Review, Conditional Use Permit, and Minor Use Permit for a new industrial building and associated on-site improvements at 6756 – 6792 Central Avenue (APN 92A-2165-14, -15, -16, and -17), subject to the Conditions of Approval, as further set forth in “Exhibit B” attached hereto and incorporated herein by this reference.

Resolution No. ______ 3 of 30
This Resolution was introduced at the City of Newark Planning Commission’s June 24, 2025 regular meeting by Commissioner _________________________, seconded by Commissioner _________________________, and passed as follows:

AYES:

NOES:

ABSENT:

STEVEN TURNER, Secretary LORI BOGISICH, Chairperson
Attachments
Exhibit A – Findings of Fact
Exhibit B – Conditions of Approval
Exhibit C – Project Narrative
Exhibit D – Project Plans
Exhibit E – CEQA Analysis
Exhibit A: Findings of Fact
Resolution No. ______ 4 of 30
Exhibit A

FINDINGS OF FACT
DR2022-010, U2024-001, and MUP2024-001
6756 – 6792 Central Avenue
Alameda County Assessor’s Parcel Number(s) 92A-2165-14, -15, -16, and -17 Design Review Criteria (Newark Municipal Code [NMC] §17.34.060) A. The overall design of the project including its scale, massing, site plan, exterior design, and landscaping will enhance the appearance and features of the project site and surrounding natural and built environment.

The Project consists of a new industrial building and associated on-site improvements at the site located at 6756 – 6792 Central Avenue. The new industrial building will consist of a contemporary style design that will provide a variety architectural features, design elements, colors, and materials. The height of the new building will be 49’-6”, measured from grade to the top of the parapet.

The new on-site improvements, which include new landscape areas, walkways, driveways, drive aisles, parking areas, bicycle parking areas, bioretention areas, employee open space area, site lighting, fencing, vehicular gates, truck courtyard area, and trailer storage area, will complement the architecture of the new industrial building. The Project will enhance the site and will be compatible with the characteristics of the surrounding environment.

Additionally, the Project will respect the surrounding development pattern. Overall, the Project's design will be complementary to the area.

This finding can be made in the affirmative.

B. The project design is appropriate to the function of the project and will provide an attractive and comfortable environment for occupants, visitors, and the general community.

As proposed, the new industrial building is considered a speculative building with no tenants.

The Project Narrative stated, “Prologis, the Project Sponsor and Owner of the property, is proposing to demolish approximately 113,500 square feet of obsolete industrial buildings on site to construct a new industrial warehouse facility that can accommodate numerous uses that meet both the City and Prologis’ interests”. This includes advanced manufacturing uses and research and development uses, which are permitted uses in the GI Zoning District.

The Project was carefully designed to ensure compatibility with and complement the site and surrounding areas while providing a comfortable environment for occupants, visitors, and the general community. The Project will be attractive and appropriate for the neighborhood.

Therefore, the proposed improvements are suitable in a manner that respects the general character of the neighborhood.

This finding can be made in the affirmative.

Exhibit A: Findings of Fact
Resolution No. ______ 5 of 30
C. Project details, materials, signage and landscaping, are internally consistent, fully integrated with one another, and used in a manner that is visually consistent with the proposed architectural design.

The Project is suitable for the site and compatible with the existing site conditions. The application of high-quality and complementary materials and the color palette help distinguish the different areas of the building. The new industrial building and on-site improvements will fully integrate with each other and contribute positively to the site and neighborhood. Overall, the Project incorporates design elements that relate to each other and lend integrity and balance to the site.

This finding can be made in the affirmative.

D. The design of streetscapes, including street trees, lighting, and pedestrian furniture, is consistent with the intended character of the area.

The Project consists of improvements to the site and the streetscape, which includes the driveway curb cuts and landscape areas at the front of the property along Central Avenue.

Currently, there are no sidewalks at the front of the property along Central Avenue. However, sidewalks will be proposed along the project frontage on Central Avenue. As part of the Planning Division’s and Engineering Division’s conditions of approval, the applicant will revise the Project plans to show the design of the sidewalk along the property frontage on Central Avenue as part of the building permit submittal.

Overall, the improvements complements the new industrial building and responds to the intended character of the area.

This finding can be made in the affirmative.

E. Parking areas are designed and developed to buffer surrounding land uses; compliment pedestrian-oriented development; enhance the environmental quality of the site, including minimizing stormwater run-off and the heat-island effect; and achieve a safe, efficient, and harmonious development.

The new on-site improvements, which include new landscape areas, walkways, driveways, drive aisles, parking areas, bicycle parking areas, bioretention areas, employee open space area, site lighting, fencing, vehicular gates, truck courtyard area, and trailer storage area will be designed to be harmonious with the site. The Project will provide a total of 396 on-site parking spaces, which meets the minimum required number of on-site parking spaces per the Zoning Code.

The Project will enhance the environmental quality of the site by including new bioretention areas for storm-water purposes. Also, the addition of the new landscape areas will address the heat island effect while enhancing the overall appearance of the site. Overall, the Project will be designed to achieve a safe, efficient, and harmonious development.

This finding can be made in the affirmative.

Exhibit A: Findings of Fact
Resolution No. ______ 6 of 30
F. Lighting and lighting fixtures are designed to complement buildings, be of appropriate scale, provide adequate light over walkways and parking areas to create a sense of pedestrian safety, and avoid creating glare.

The Project proposes new exterior light fixtures around the building and site. The proposed exterior light fixtures will comply with NMC §17.17.060. Any other lighting not covered under this design review entitlement is subject to regulations specified in NMC §17.17.060 - Lighting and Illumination.

This finding can be made in the affirmative.

G. Landscaping is designed to be compatible with and enhance the architectural character and features of the buildings on site and help relate the building to the surrounding landscape.

The Project proposes new landscaping on site. The new landscaping will be designed to be compatible with and enhance the architectural character and features of the site. The Project has been conditioned to require all landscaping to be maintained in healthy growing condition and that plantings be replaced with other plant materials to ensure continued compliance with the applicable landscaping regulations in NMC Chapter 17.21.

This finding can be made in the affirmative.

Conditional Use Permit Findings (NMC §17.35.060)
A. The proposed use is allowed within the applicable zoning district and complies with all other applicable provisions of this title [NMC Title 17] and all other titles of the Municipal Code.

The Project requires approval of a Conditional Use Permit to allow for an “indoor warehousing and storage” use and a “wholesaling and distribution” use in the GI Zoning District. The Project has been evaluated and will be substantially in compliance with the applicable provisions of the Zoning Code. Additionally, the Project has been found to be consistent with the type of uses found in the GI Zoning District and will be compatible with the surrounding industrial uses in the nearby area.

This finding can be made in the affirmative.

B. The proposed use is consistent with the general plan and any applicable specific plan.

The Project site has a General Plan Land Use designation of General Industrial. The Project will be consistent with many of Newark’s General Plan policies including, but not limited to:
• Policy LU-1.5 - Technology Focus. Promote the city as a good location for technology businesses and clean industry, capitalizing on Newark's location within Silicon Valley. • Policy LU-1.17 - Sustainable Development Emphasis. Ensure that new development incorporates green building and sustainable design principles and encourage renovation of existing development to use water and energy more efficiently.

Exhibit A: Findings of Fact
Resolution No. ______ 7 of 30
• Policy ED-3.1 - Industrial Land Supply. Maintain a sufficient supply of land for office and industrial uses to generate high quality, high paying jobs and to meet the city’s economic development goals. Focus office and industrial development on technology uses and other activities that will generate high wage employment. • Policy ED-3.7 - Industrial Redevelopment. Encourage property owners to redevelop industrial sites and buildings when the proposed redevelopment will generate highquality and high-paying jobs. Likewise, support the refurbishing of such spaces for continued use as general industrial properties.
• Policy ED-4.4 - Affordable Industrial Space. Continue to support and foster the growth of general industrial uses, such as warehouse and distribution centers and manufacturing, in the Cherry Street and Central Avenue corridors and other areas designated for “General Industrial” uses on the Land Use Diagram.

This finding can be made in the affirmative.

C. The proposed use will not be adverse to the public health, safety, or general welfare of the community, nor detrimental to surrounding properties or improvements.

As proposed, the new industrial building is considered a speculative building with no tenants.

The Project will not be adverse to the public health, safety, or general welfare of the community or surrounding properties in that the Project site is mainly surrounded by industrial uses.

This finding can be made in the affirmative.

D. Tax revenue generated by the development will exceed the City's cost of the service demand as a result of the development or a compelling community benefit will be provided.

The Project would replace an existing warehouse building and uncovered storage yards, which is anticipated to be assessed with a higher property tax base for the property. As proposed, the new industrial building is considered a speculative building with no tenants. The Applicant has presented to Staff a Fiscal Analysis of the Project. Based on that Analysis and depending on the use that occupies the building, it is anticipated that the Project will exceed the cost of City services.

This finding can be made in the affirmative.

E. The proposed use complies with any design or development standards applicable to the zoning district or the use in question unless waived or modified pursuant to the provisions of this title [NMC Title 17].

The proposed “indoor warehousing and storage” use and “wholesaling and distribution” use is allowed with the approval of a Conditional Use Permit under the GI Zoning District. The Exhibit A: Findings of Fact
Resolution No. ______ 8 of 30
Project adheres to the development standards within the GI Zoning District, such as setbacks, height, and parking requirements. The new building’s contemporary style design is compatible with the adjacent buildings and does not appear to have a negative effect on the adjacent properties or the surrounding area. Overall, the Project will comply with the development standards applicable to the Zoning District.

This finding can be made in the affirmative.

F. The design, location, size, and operating characteristics of the proposed activity are compatible with the existing and reasonably foreseeable future land uses in the vicinity.

The Project’s contemporary style design will be compatible with the surrounding area. As conditioned, the Project will not interfere with operations/businesses in this zone. Also, the Project will not deviate from the intent of district’s development standards. Therefore, the design, location, size, and operating characteristics of the Project will be compatible with the existing and foreseeable future land uses in the vicinity.

This finding can be made in the affirmative.

G. The site is physically suitable for the type, density, and intensity of use being proposed, including access, utilities, and the absence of physical constraints.

The Project site will be suitable to accommodate the Project as it will provide upgrades to the existing site conditions. The Project will enhance the overall appearance of the site, while respecting the surrounding development pattern. The Project will continue to provide access and utilities on the site.

This finding can be made in the affirmative.

Minor Use Permit Findings (NMC §17.35.060)
A. The proposed use is allowed within the applicable zoning district and complies with all other applicable provisions of this title [NMC Title 17] and all other titles of the Municipal Code.

The maximum height for fencing within the required front setback area is 3 feet. Pursuant to NMC §17.17.040(A)(2), an additional height increase for fencing in non-residential districts requires approval of a Minor Use Permit. The Applicant requests approval of a Minor Use Permit to allow for an additional height increase to the new prefinished vertical tube steel fencing to be 6 feet within the minimum required 10-foot front setback area.

The Project will be in compliance with the applicable provisions of Title 17 – Zoning, which includes meeting the material requirements outlined in NMC §17.17.040(A)(1)(a)(i)(3).

Overall, the Project has been evaluated and will be substantially in compliance with the applicable provisions of the Zoning Code.

This finding can be made in the affirmative.

Exhibit A: Findings of Fact
Resolution No. ______ 9 of 30
B. The proposed use is consistent with the general plan and any applicable specific plan.

The Project site has a General Plan Land Use designation of General Industrial. The Project is consistent with the general plan. The additional height to the fence will allow for the new industrial building’s occupants to operate safely. Additionally, the Project will not alter the respective land-use designation.

This finding can be made in the affirmative.

C. The proposed use will not be adverse to the public health, safety, or general welfare of the community, nor detrimental to surrounding properties or improvements.

The Project includes an additional height increase to the new prefinished vertical tube steel fencing to be 6 feet in the minimum 10-foot front setback area. The location of the new fencing will be adjacent to the Union Pacific Railroad. The Project will not detract from the overall appearance of the neighborhood. Overall, the Project will not be adverse to the public health, safety, or general welfare of the community nor detrimental to surrounding properties or improvements.

This finding can be made in the affirmative.

D. Tax revenue generated by the development will exceed the City's cost of the service demand as a result of the development or a compelling community benefit will be provided.

The additional height increase to the new prefinished vertical tube steel fencing will not materially impact the City’s tax revenue, nor will it additionally strain City services. The Project, in total, would replace an existing warehouse building and uncovered storage yards, which is anticipated to be assessed with a higher property tax base for the property.

This finding can be made in the affirmative.

E. The proposed use complies with any design or development standards applicable to the zoning district or the use in question unless waived or modified pursuant to the provisions of this title [NMC Title 17].

The additional height increase to the new fencing is allowed subject to meeting the applicable provisions of Title 17 – Zoning, which includes meeting the material requirements outlined in NMC §17.17.040(A)(1)(a)(i)(3). The new fencing is 6 feet in height and consist of a prefinished vertical tube steel material. Overall, the Project will comply with the development standards applicable to the Zoning District. The Project's design will be complementary to the area and does not appear to have a negative effect on the adjacent properties nor the surrounding area.

This finding can be made in the affirmative.

Exhibit A: Findings of Fact
Resolution No. ______ 10 of 30
F. The design, location, size, and operating characteristics of the proposed activity are compatible with the existing and reasonably foreseeable future land uses in the vicinity.

The additional height increase to the new fencing will not interfere with the other industrial uses in this zone. Additionally, the Project will not deviate from the intent of district’s development standards. Therefore, the design of the Project will be compatible with the existing and foreseeable future land uses in the vicinity.

This finding can be made in the affirmative.

G. The site is physically suitable for the type, density, and intensity of use being proposed, including access, utilities, and the absence of physical constraints.

The Project site and the additional height increase to the new fencing will be suitable to accommodate the Project as it will upgrade the existing site conditions. The Project will enhance the overall appearance of the site, while respecting the surrounding development pattern. The Project will continue to provide access and utilities on the site.

This finding can be made in the affirmative.

Minor Use Permit Findings for Additional Fence Height (NMC §17.17.040(A)(1)(a)(ii)) A. The additional fence height will not impair the provision of adequate light, air, circulation, and visual openness around adjacent residential structures.

The Project includes an additional height increase to the new fencing to be 6 feet in the minimum 10-foot front setback area. The additional height increase will consist of a prefinished vertical tube steel material that meets the material requirements outlined in NMC §17.17.040(A)(1)(a)(i)(3). The Project site is not abutting residential structures. The location of the new fencing will be adjacent to the Union Pacific Railroad. Therefore, the additional height will not impair the provision of adequate light, air, circulation, and visual openness around adjacent residential structures.

This finding can be made in the affirmative.

B. The additional fence height will not detract from the overall appearance of the neighborhood.

The additional height to the new fencing will be a prefinished vertical tube steel fencing material. The location of the new fencing will be adjacent to the Union Pacific Railroad. The design of the new fencing will allow for the Project to be seamlessly integrated into the neighborhood. Therefore, the additional height will not detract from the overall appearance of the neighborhood.

This finding can be made in the affirmative.

Exhibit A: Findings of Fact
Resolution No. ______ 11 of 30
C. The additional fence height is not detrimental to the health, safety, and welfare of people living in the neighborhood.

The additional height of the new fencing will be consistent with the height of the other new fencing that is located adjacent to the Union Pacific Railroad. The new fencing will be of an aesthetically pleasing design that blends in with the property and surrounding area.

Additionally, there is no evidence to suggest that the additional height will cause any harm to the community. Therefore, the additional height will not be detrimental to the health, safety, and welfare of people living in the neighborhood.

This finding can be made in the affirmative.

California Environmental Quality Act (CEQA) Categorical Exemption Findings The Project is eligible for the following CEQA exemptions:
• Consistency with Program EIR. The City of Newark 2013 FEIR provides for streamlining and/or tiering provisions under CEQA Guidelines Section 15168. This CEQA Analysis demonstrates that the Project would not result in substantial changes or involve new information that would warrant preparation of a subsequent EIR because the level of development proposed is within the development assumptions analyzed in the program level EIR (2013 FEIR). No further environmental review is required. • Community Plan Exemption. Streamlined environmental review per Section 15183 of the CEQA Guidelines and California Public Resources Code Section 21083.3. The Project is consistent with the General Plan and will not result in significant environmental impacts that were not previously identified as significant project-level, cumulative or offsite effects in the 2013 FEIR. The Project is exempt from further CEQA review since it is consistent with the General Plan.

The Project is within the scope of development projected under the General Plan for which an EIR was certified in 2013. The Project will implement applicable mitigation measures identified in the 2013 FEIR. In addition, the Project will be required to comply with applicable conditions of approval (Attachment 1, Exhibit B) and is subject to uniformly applied development standards.

With implementation of required mitigation measures and conditions of approval, the Project will not result in a substantial increase in the severity or significant impacts that were previously identified in the program level EIR, nor will the Project introduce any new significant impacts that were not previously identified. Therefore, there will be no additional environmental impacts beyond those analyzed in the 2013 FEIR.

Exhibit B: Conditions of Approval
Resolution No. ______ 12 of 30
Exhibit B

CONDITIONS OF APPROVAL
DR2022-010, U2024-001, and MUP2024-001
6756 – 6792 Central Avenue
Alameda County Assessor’s Parcel Number(s) 92A-2165-14, -15, -16, and -17 Planning Division
a. A building permit shall be required prior to the construction of the Project. The building permit plans shall be substantially consistent with the approved plans (see Attachment 1, Exhibit D), or as otherwise required by these conditions of approval. b. These conditions of approval shall be printed on the building-permit drawings associated with this Project.
c. A Planning Final shall be required prior to the Final Building Inspection. d. The applicant/property owner/business operator/developer shall comply with any and all applicable federal, state, or local laws and regulations. e. The building permit plans shall demonstrate compliance with the enclosure pad, bumpers, clear zone, and drainage requirements for the trash enclosure as outlined in NMC §17.17.120(B)(2). f. Any revisions to the proposed garbage, refuse and recycling service pick up plan shall require review and approval by Republic Services and the Community Development Director, prior to the issuance of a building permit. No refuse, garbage or recycling shall be stored outdoors except within the approved trash enclosure.
g. The building permit plans shall show the removal of the new chain link fencing along the front (southwestern) property line as part of the building permit submittal. h. The building permit plans shall show the design of the sidewalk along the property frontage on Central Avenue as part of the building permit submittal. i. The Landscape Plans (Sheet LC1.1) shall show the correct design of the driveway curb cuts. j. The building permit plans shall show the 32 dock doors with two grade-level doors and 14 door knockouts.
k. Any proposed changes to the design of the new industrial building that include the conversion of the additional door knockouts to dock doors for an “indoor warehousing and storage” use and/or a “wholesaling and distribution” use shall require Planning Commission review and approval.
l. All other proposed changes from approved exhibits shall be submitted to the Community Exhibit B: Conditions of Approval
Resolution No. ______ 13 of 30
Development Director who shall decide if they warrant Planning Commission review and, if so decided, said changes shall be submitted for the Commission’s review and decision. The applicant and/or property owner shall pay the prevailing fee for each additional separate submittal of project exhibits requiring Planning Commission and/or City Council review and approval.
m. Prior to the issuance of a Certificate of Occupancy, the parking areas, aisles and access drives shall be installed and striped as shown on the approved site plan. n. If any of the conditions of approval are not incompliance and/or have been substantially expanded beyond the Project’s approval regarding parking, on-site circulation and/or traffic , the Community Development Director shall review and decide how to mitigate those issues.

A parking, on-site circulation and/or traffic analysis shall be prepared at the discretion of the Community Development Director and the cost of the applicant and/or property owners. The applicant and/or property owners shall mitigate any issues identified by the parking, on-site circulation and/or traffic study. If the applicant does not mitigate these issues, the entitlements may be referred to the Planning Commission for determination if the entitlements are to be revoked.
o. Parking lot cleaning with sweeping or vacuum equipment shall not be permitted between 7:00 p.m. and 7:00 a.m.
p. All landscaping shall be maintained in healthy growing condition. Wherever necessary, plantings shall be replaced with other plant materials to ensure continued compliance with the applicable landscaping regulations in NMC Chapter 17.21. q. All exterior utility pipes and meters shall be painted to match and/or complement the color of the adjoining building surface, as approved by the Community Development Director. r. All exterior lighting shall comply with all applicable regulations in NMC §17.17.060 - Lighting and Illumination. All exterior lighting shall be directed on-site so as not to create glare off-site. s. All mechanical and electrical equipment (e.g., transformer, generator, roof equipment, etc.) shall meet the screening requirements in NMC §17.17.100 - Screening. Mechanical and electrical equipment such as air conditioners (AC) units shall not be placed in the front or street side yard. If equipment is placed in any other location that makes it visible to public view, the equipment shall be properly screened with solid material pursuant to the regulations in NMC §17.17.100 - Screening.
t. The Project shall comply with all applicable noise standards in the NMC and General Plan, including, but not limited to NMC §17.24.100 - Noise. This includes all mechanical and electrical equipment.
u. All construction noise activity shall abide by NMC §17.24.100 - Noise. v. Construction equipment, including compressors, generators and mobile equipment shall be Exhibit B: Conditions of Approval
Resolution No. ______ 14 of 30
fitted with heavy-duty mufflers designed to reduce noise impacts. w. The Project shall comply with the conditions outlined in the Acoustical Assessment prepared by Kimly Horn dated December 2023, or as amended.
x. The Project shall implement the Project Design Features from the Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis prepared by FirstCarbon Solutions dated July 19, 2024, or as amended, which includes:

PDF AIR-1 Prohibition of Cold Storage Use and Transport Refrigeration Units The project operation would address any potential Transport Refrigeration Unit usage by requiring the following:
• Contractual language in all tenant lease agreements that will prohibit tenants from operating Transport Refrigeration Units (TRUs) within the project site. • Requiring a restrictive covenant over the parcel that prohibits the applicant’s use of TRUs on the property unless the applicant seeks and receives an amendment to its conditional use permit allowing such use.
• The application of any future requests for cold storage and associated TRU usage to include an analysis which requires the modeling and a Health Risk Assessment of air toxic contaminants emitted from operation of these TRUs. The results of such analysis must demonstrate that the operation of TRUs would not result in a significant health impact as defined by BAAQMD thresholds.

PDF AIR-2 All-Electric Design
• Prior to issuance of building permits, the project applicant shall provide documentation (e.g., site plan) to the City to demonstrate that the proposed industrial development does not include natural gas appliances or natural gas plumbing.

PDF AIR-3 Use of Tier 4 Construction Equipment
• Prior to the issuance of any demolition, grading, or building permits (whichever occurs earliest), the project applicant and/or construction contractor shall prepare a construction operations plan that, during construction activities, requires all off-road equipment with engines greater than 50 horsepower to meet particulate matter emissions standards for Tier 4 Interim engines at the minimum. The construction contractor shall maintain records documenting its efforts to comply with this requirement, including equipment lists. Offroad equipment descriptions and information shall include, but are not limited to, equipment type, equipment manufacturer, equipment identification number, engine model year, engine certification (Tier rating), horsepower, and engine serial number. The project applicant and/or construction contractor shall submit the construction operations plan and records of compliance to the City
y. Prior to the installation of any signage, the applicant and/or property owners shall submit a Exhibit B: Conditions of Approval
Resolution No. ______ 15 of 30
Sign Permit Application to the Planning Division for review and approval. Signage, including freestanding signs and wall signs, shall comply with Chapter 17.25 – Signage Standards. z. Prior to the issuance of grading and site work permit(s), mailbox locations and designs shall be approved by the Community Development Director and Newark Postmaster, in that order. aa. Prior to issuance of a grading permit, the applicant shall hire a qualified biologist to: (1) determine if occupied Burrowing Owl habitat(s) exist on the site, and (2) implement a plan to protect the owls and to excavate the site around any active burrows using hand tools to assure that the owls are not buried during grading in the event Burrowing Owl habitat(s) is found on the site. The occupied Burrowing Owl habitat(s), if found, shall not be disturbed during the nesting season. The Burrowing Owl study shall be conducted not more than 30 days prior to the time site grading activities will commence.
bb. The site and its improvements shall be maintained in a neat and presentable condition, to the satisfaction of the Community Development Director. This shall include, but not limited to, repainting surfaces damaged by graffiti, site clean-up, and maintenance of the landscaping areas. Graffiti removal/repainting, site clean-up, and maintenance of the landscaping areas shall occur on a continuing, as needed basis.
cc. Construction site trailers and buildings located on-site shall be used for office and storage purposes only and shall not be used for living or sleeping quarters. Any vehicle or portable building brought on the site during construction shall remain graffiti free. dd. Prior to the issuance of a building permit, the applicant, property owners, and/or developer shall pay the City’s impact fees in effect as well as the Community Development Maintenance Fee. The impact fees shall be based on the new building square footage for the Project. ee. The applicant shall work with the City on the public art installation for the Project as part of the building permit submittal. The Project shall be waived from paying the Art in Public Places and Private Development fee if public art is installed. ff. The Project sponsor shall require construction contractors to implement the following applicable BAAQMD Basic Construction Mitigation Measures to reduce emissions of fugitive dust and equipment exhaust.
gg. Measures to respond to and track complaints pertaining to construction noise shall include: (1) a procedure and phone numbers for notifying the City of Newark Building Inspection Division and Newark Police Department (during regular construction hours and off-hours); and (2) a sign posted on-site pertaining to the permitted construction days and hours and complaint procedures and who to notify in the event of a problem. The sign shall also include a listing of both the City and construction contractor’s telephone numbers (during regular construction hours and off-hours).
hh. During project construction, if historic, archeological or Native American materials or artifacts are identified, work within a 50-foot radius of such find shall cease and the City shall retain Exhibit B: Conditions of Approval
Resolution No. ______ 16 of 30
the services of a qualified archeologist and/or paleontologist to assess the significance of the find. If such find is determined to be significant by the archeologist and/or paleontologist, a resource protection plan conforming to CEQA §15064.5 shall be prepared by the archeologist and/or paleontologist and approved by the Community Development Director. The plan may include, but would not be limited to, removal of resources or similar actions. Project work may be resumed in compliance with such plan. If human remains are encountered, the County Coroner shall be contacted immediately, and the provisions of State law carried out. ii. The City of Newark and its agents, officers, and employees shall be defended, indemnified, and held harmless from any claim, action or proceedings against the City, or its agents, officers, and employees to attach, set aside, void, or annul the approval of this application or the environmental determination which accompanies it, or which otherwise arises out of or in connection with the City’s action on this application, including but not limited to, damages, costs, expenses, attorney’s fees, or expert witness fees. jj. The Community Development Director shall interpret applicable requirements in the event of any redundancy or conflict in conditions of approval.
kk. The Community Development Director shall have the right to modify or terminate this Design Review, Conditional Use Permit, and Minor Use Permit at any time if any of the terms of such permit or the conditions of approval for said permit are violated, or for other good cause deemed necessary to maintain or improve the public right-of-way or to preserve and protect the health, safety, and welfare of the public.
ll. If any condition of the entitlements be declared invalid or unenforceable by a court of competent jurisdiction, the entitlements shall terminate and be of no force and effect, at the election of the Planning Commission and/or City Council on motion. mm. The applicant hereby agrees to defend, indemnify, and save harmless the City of Newark, its Council, boards, commissions, officers, employees and agents, from and against any and all claims, suits, actions, liability, loss, damage, expense, cost (including, without limitation, attorneys’ fees, costs and fees of litigation) of every nature, kind or description, which may be brought by a third party against, or suffered or sustained by, the City of Newark, its Council, boards, commissions, officers, employees or agents to challenge or void the permit granted herein or any California Environmental Quality Act determinations related thereto. nn. In the event that any person should bring an action to attack, set aside, void or annul the City’s approval of this project, the applicant shall defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action, or proceeding against the City and/or its agents, officers and employees with counsel selected by the applicant (which shall be the same counsel used by applicant) and reasonably approved by the City. Applicant’s obligation to defend, indemnify and hold harmless the City and/or its agents, officers and employees shall be subject to the City’s compliance with Government Code Section 66474.9. oo. The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements and other exactions. Pursuant to Government Code Exhibit B: Conditions of Approval
Resolution No. ______ 17 of 30
Section 66020(d)(1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations and other exactions. The applicant is hereby further notified that the 90-day approval period in which the applicant may protest these fees, dedications, reservations and other exactions, pursuant to Government Code Section 66020(a), has begun. If the applicant fails to file a protest within this 90-day period complying with all of the requirements of Section 66020, the applicant will be legally barred from later challenging such exactions.
pp. Per NMC §17.31.130, the approval or conditional approval of the Design Review, Conditional Use Permit, and Minor Use Permit shall expire three years from the date the Design Review, Conditional Use Permit, and Minor Use Permit was approved or conditionally approved if it is not exercised or extended within three years of its approval. Additionally, any other permit granted under NMC Title 17 - Zoning, shall automatically expire if it is not exercised or extended within two years of its approval, unless a different time period is specified.

Engineering Division
qq. SUBDIVISION MAPS: The subdivision of land is governed by Newark Municipal Code Title 16, as well as the California Government Code §§66410-66499.85 (Subdivision Map Act). All maps are subject to review and approval by the City Engineer. Recordation of the subdivision map shall be coordinated by the applicant’s title company, with one full-sized mylar copy of the recorded map returned to the City.

1. Prior to building permit issuance, the parcel map to merge the four individual parcels into one shall be recorded at the Alameda County Recorders’ Office.

2. Coinciding with the Planning Commission’s approval of the entitlements, the applicant shall execute the encumbrance documents as listed below, and submit them to the City for review and final execution within ten (10) working days following the expiration of the appeal period. If the project is appealed and requires City Council action on the entitlements, the documents shall be executed and submitted to the City for review and approval within ten (10) working days following City Council approval.

Upon execution by the City, the documents shall be recorded with the Alameda County Recorder’s Office. Exhibit EX-2 shows the conceptual layout of the easements, and the actual dimensions and easements shall be to the satisfaction of the City Engineer. i. 14-foot-wide Landscape Easement
ii. 10-foot-wide Public Service Easement along the project frontage up to the limits of the future Central Avenue overpass improvements where a grade difference between Central Avenue and project site.
iii. 30-foot-wide Alameda County Water District (ACWD) Waterline Easement as shown on the Exhibit EX-2.
iv. 30-foot-wide Access Easement to the satisfaction of ACWD. v. Three ACWD water lateral easements connecting Central Avenue and the 30-footwide Waterline Easement to the satisfaction of ACWD.

Exhibit B: Conditions of Approval
Resolution No. ______ 18 of 30
vi. ACWD water lateral easement extending southeast direction from the 30-foot-wide ACWD Waterline Easement to the satisfaction of ACWD.
vii. 10-foot-wide Sidewalk and Maintenance Easement to the satisfaction of the City Engineer.
viii. Emergency Vehicle Access Easement as required to the satisfaction of Alameda County Fire Department.
ix. Temporary Construction Easement (TCE) A and TCE B to the satisfaction of the City Engineer.
x. Complete relinquishment of abutter’s rights over the frontage of APNs 92A-2165-17 and 92A-2165-16, and a partial relinquishment of abutter’s rights over the frontage of APNs 92A-2165-15 and 92A-2165-14 to the satisfaction of the City Engineer. xi. Reciprocal access, Private Utility Easement, Private Stormdrain Easement, Emergency Vehicle Access Easement (EVAE), Public Utility Easement (PUE), Public Storm Drain Easement, parking easements shall be established in favor of APNs 92A-2165-17 and 92A-2165-16 over APNs 92A-2165-15 and 92A-2165-14, as determined by the final design and to the satisfaction of the City Engineer. This requirement is necessary because the lots will not be merged until the Parcel Map is recorded. Additionally, the complete relinquishment of abutter’s rights over the frontage of APNs 92A-2165-17 and 92A-2165-16, and a partial relinquishment of abutter’s rights over the frontage of APNs 92A-2165-15 and 92A-2165-14, shall coincide with the Planning Commission’s approval of the Entitlements.

3. Concurrent with approval of the Parcel Map, the applicant shall effectuate the removal of any existing easements encumbering the property that conflict with areas proposed for improvement. Elimination or modification of existing easements on the site requires approval from the respective utility district or company and the City of Newark. Easement modifications and removals shall be performed with the Parcel Map.

4. Along with the Parcel Map application, a complete improvement plan set shall be submitted to the Engineering Division for review and approval to ensure conformance with relevant codes, policies, and other requirements of the Newark Municipal Code and City of Newark Street improvement standards. These plans shall be prepared by a qualified person licensed by the State of California to do such work. The plans shall be drawn to an appropriate scale as required by the City Engineer.
rr. SUBDIVISION IMPROVEMENT AGREEMENT: Prior to approval of the parcel map, the applicant shall enter into a Subdivision Improvement Agreement with the City and guarantee all necessary public and private street improvements and other common area improvements within the subdivision and beyond the map boundary in accordance with the improvement plans to be approved by the City Engineer. The agreement requires the applicant to post financial security in the form of either a cash deposit, letter of credit, or surety bonds in amounts equivalent to the value of the public improvements. If surety bonds are utilized, the amounts of the bonds shall be 100% of the total estimated value of the public improvements consistent with the City of Newark Municipal Code. In addition, the City requires a warranty bond (often referred to as a maintenance bond) for 20% of the estimated value. The warranty period shall be active for no less than one-Calander year following formal acceptance of the improvements. The warranty bond may be released by the City Engineer upon completion of Exhibit B: Conditions of Approval
Resolution No. ______ 19 of 30
the warranty period and correction of all warranty items to the satisfaction of the City Engineer.

All submitted securities are subject to review and approval by the City Attorney. ss. SIDEWALK IMPROVEMENTS: The project is responsible for constructing a six-foot-wide meandering sidewalk along the property frontage on Central Avenue, connecting to the adjacent northeast property, consistent with the City of Newark Standard Details. The precise alignment and limits of the sidewalk shall be shown on the improvement plans and are subject to approval by the City Engineer prior to recordation of the Parcel Map.

The City Engineer reserves the right to waive this sidewalk construction requirement. Any waiver of this requirement will be communicated in writing to the applicant. tt. GEOTECHNICAL RECOMMENDATIONS:

1. Submit a Geotechnical Report that shall address in-situ and import soils in accordance with the City of Newark Grading and Excavation Ordinance, Chapter 15.50. This report shall include recommendations regarding pavement sections. Grading operations shall be in accordance with recommendations contained in the soils report and shall be completed under the supervision of an engineer registered in the State of California to do such work.

2. Additional Geotech Investigation Report peer review by the City’s consultant to verify the targeted static and seismic induced settlement reductions shall be required to be performed prior to the issuance of the building permit. Ground improvement methods, if proposed, may require coordination and approval from Alameda County Water District. The applicant shall pay for costs associated with the Geotechnical peer review and/or inspections per the City’s Master Fee Schedule.

3. Prior to Grading Permit and Building Permit issuance, recommendations from the project’s geotechnical investigation, as prepared by a California-licensed Geotechnical Engineer or Certified Engineering Geologist, shall be incorporated into the design of the improvements and/or explicitly noted on the plans. The author(s) of the geotechnical investigation shall certify on the plans that the designs comply with their recommendations. During construction, the applicant shall follow all recommendations.

4. The applicant’s geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspections shall include, but not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations prior to the placement of steel and concrete. The results of these inspections and the as-built conditions of the project shall be described by the geotechnical consultant in a letter and submitted to the City Engineer for review and approval prior to project final acceptance. uu. CONSTRUCTION GENERAL PERMIT: This application is subject to a Construction General Permit according to the National Pollutant Discharge Elimination System (NPDES) General Permit No. CAS000002. Prior to the issuance of a grading permit or a building permit, the Waste Dischargers Identification (WDID) number shall be printed on the plans to provide evidence that the proposed site development work is covered by said General Permit for any Construction Activity. The applicant will be required to register the project with the State Water Board’s Stormwater Multi-Application and Report Tracking System (SMARTS) website. A Qualified SWPPP Developer (QSD) and a Qualified SWPPP Practitioner (QSP) Exhibit B: Conditions of Approval
Resolution No. ______ 20 of 30
shall be responsible for permit compliance. In addition, the grading plans need to state: “All grading work shall be done in accordance with the approved Storm Water Pollution Prevention Plan prepared by the developer pursuant to the Notice of Intent on file with the State Water Resources Control Board.”
vv. CLEAN WATER PROGRAM (LARGE PROJECTS):

1. Because the project creates and/or replaces more than 5,000 square feet of impervious surface, it is considered a Regulated Project according to Provision C.3.b of the Municipal Regional Stormwater NPDES Permit that regulates stormwater runoff in Alameda County.

The Alameda Countywide Clean Water Program developed a C.3 Guidance Manual to assist applicants in addressing these regulations. The Guidance Manual is available for download at:
https://cleanwaterprogram.org/businesses/development/
Regulated projects shall include stormwater treatment measures in the site design to remove pollutants from stormwater upstream of any connection to the City’s or Alameda County’s stormwater conveyance networks. In addition, regulated projects shall be subject to a Stormwater Treatment Measure Maintenance Agreement between the City and property owner to assure long-term maintenance of the installed measures. The City will provide a template agreement. Once executed, the agreement shall be recorded against the property.

The provided Preliminary Stormwater Treatment Plan is approved in concept only. The final Stormwater Treatment Design shall be prepared by a licensed civil engineer. Final approval is subject to the applicant providing the necessary plans, details, and calculations that demonstrate the plan comply with the latest Municipal Regional Stormwater NPDES Permit (MRP).

2. Prior to Parcel Map approval, Stormwater Requirements Checklist shall be submitted along with the improvement plans for review and approval.

3. All stormwater treatment measures are subject to review and approval by the Alameda County Mosquito Abatement District. The developer shall modify the grading and drainage and stormwater treatment design as necessary to satisfy any imposed requirements from the District.
ww. FULL TRASH CAPTURE: The entire site shall be equipped with full trash capture devices approved by the Regional Water Quality Control Board – San Francisco Bay Region and the Mosquito Abatement District, for 100% trash capture at all on-site and adjoining off-site storm drain inlets. All on-site trash capture devices shall be permanently maintained by the property owner. Acceptable off-site trash capture devices can be found on the City’s website at https://www.newark.org/departments/public-works/engineering-division/stormwaterprogram. xx. GRADING AND DRAINAGE PLANS: Prior to Parcel Map approval, the developer shall submit detailed grading and drainage plans for review and approval by the City Engineer.

Plans shall be based on a City benchmark, on NGVD 29 datum, shall include pad and finish Exhibit B: Conditions of Approval
Resolution No. ______ 21 of 30
floor elevations of each proposed structure, proposed on-site property grades, proposed elevations at property line, and sufficient elevations on all adjacent properties to show existing drainage patterns. All on-site pavement shall drain at a minimum of one percent. The developer shall ensure that all upstream drainage is not blocked and that no ponding is created by this development. Any construction necessary to ensure this shall be the developer's sole responsibility.
yy. HYDROLOGY AND HYDRAULIC REPORT: Hydrology and hydraulic calculations, including a drainage area map for on and offsite watersheds, a narrative explaining assumptions, criteria, methodology, and how the starting HGL was established, shall be submitted for review and approval by the City Engineer and the Alameda County Flood Control & Water Conservation District (ACFC&WCD) prior to approval of the improvement plans and Parcel Map. The calculations shall show that the City and County freeboard requirements are satisfied and that any increase in flow is mitigated with on-site detention or storage, such that the downstream facility will not be surcharged by the post-development discharge from the project.
zz. EMERGENCY OVERLAND STORMWATER FLOW/SUMP PROPERTIES: The Grading Plans shall show that the entire property is designed with an emergency overland flow path to direct storm runoff to the nearest public street or open flood control facility in the event onsite pipes become plugged. The flow path shall be lower than the finish floor elevation of all habitable structures. The flow path cannot rely on neighboring properties unless a storm drain easement across the neighbor is obtained. Sump properties shall be designed to discharge the 50-year recurrence interval storm event through the pipe network before habitable structures become inundated.
aaa. Where a grade differential is created along the boundary lot lines between the proposed development and adjacent property, the applicant shall install a permanent retaining wall (concrete or masonry or similar approved material) unless a slope easement is approved by the City Engineer. Said retaining wall shall be subject to review and approval of the City Engineer.

A grading permit is required by the Building Inspection Division prior to starting site grading work.
bbb. SITE DESIGN:

1. During the building permit review, the plans shall show the visibility control triangle to demonstrate compliance with the Visibility Ordinance. The plans shall show that there is no obstructions adjacent to the driveways, and determine where signs or any above-grade utility boxes can be located. The Engineering Department can provide a copy of Visibility Ordinance information sheet when requested.

2. The Preliminary Landscape Plan shows trees within the landscape strip along south property line that conflict with an existing sewer line to remain. If these trees are accounted towards meeting any landscape zoning code, a revised Preliminary Landscape Plan will need to show removal of these trees and their new locations.

Exhibit B: Conditions of Approval
Resolution No. ______ 22 of 30
ccc. Prior to issuance of Building Permit, existing buildings within the project boundary shall be demolished. The applicant shall apply and receive a building permit and obtain a permit final for the demolition.
ddd. The applicant shall install private streets improvements including, but not be limited to driveways, drive aisles, parking facilities, utilities, storm water treatment facilities, screen walls, fencing, and all landscape areas. All private streets in the development shall be designed and constructed to City standards, are subject to review and approval by the City Engineer and shall be included with the improvement plans.
eee. The applicant shall obtain grading and site work permit(s) from Building Inspection Division for the site grading (rough grading and/or fine grading) and private structures including, but not limited to perimeter retaining walls. fff. PAVEMENT MAINTENANCE PROGRAM: Prior to the issuance of a building permit, the developer's engineer shall submit a pavement maintenance program for the drive aisles and parking areas for the review and approval of the City Engineer. The developer shall incorporate the program into the required Storm Water Pollution Prevention Plan and Storm Water Treatment Measures Maintenance Agreement.
ggg. Prior to issuance of a Certificate of Occupancy or release of utilities for the building, vehicle access ways and parking facilities shown on the plans shall be paved in accordance with the recommendation of a licensed engineer based on a Traffic Index of 5.0 and striped as shown on the approved site plan. Minimum asphalt concrete thickness for the vehicle access ways shall be 4 inches.
hhh. All dry utilities including, but not limited to, electric, telephone, alarm systems, and cable television services shall be provided underground from the point-of-connection at the utility purveyor’s network to the service point. Electrical transformers shall be installed in underground vaults with an appropriate public utility easement. iii. Multiple street trench cuts and openings (i.e. greater than two street cuts or openings) as a result of utility connections and other necessary street openings on Central Avenue shall be resurfaced from curb to curb to the satisfaction of the City Engineer. All pavement restoration and resurfacing shall be completed concurrent with the site development. The extent of street resurfacing shall be shown on the improvement plans prior to approval of Parcel Map. The extent of resurfacing to the satisfaction of the City Engineer. jjj. All public improvements shall be designed in conformance with the City of Newark Municipal Code and the City’s adopted Standard Details in effect at the time of issuance of the permit(s). kkk. ENCROACHMENT PERMIT: Any work performed within the City’s right-of-way, City easements, or City-owned property shall be subject to an Encroachment Permit as defined in Newark Municipal Code. All encroachment permit work is subject to adopted City of Newark Standard Details, and shall be performed by properly-licensed contractors as determined by Exhibit B: Conditions of Approval
Resolution No. ______ 23 of 30
the City Engineer. Said contractors must provide evidence of proper licensure, insurance and City-issued Business License upon application for a permit. lll. OTHER AGENCY APPROVALS:

1. Prior to Parcel Map recordation, the proposed water, sewer, and dry utility connections are subject to review and approval by the Alameda County Water District (ACWD), Union Sanitary District (USD), and Pacific, Gas & Electric Company (PG&E), respectively. The Title Sheet of improvement plans shall be signed by the ACWD, USD prior to recordation of Parcel Map. Any necessary site and utility design changes to satisfy requirements from the individual utilities or districts shall be the applicant’s responsibility.

2. The applicant is encouraged to apply to PG&E as soon as possible to discuss the project’s electrical and gas needs. Joint trench composite plans shall be part of the improvement plan submitted along with the Parcel Map application.

3. The project improvement plans along with the Hydrology & Hydraulic Report shall be submitted to Alameda County Flood Control & Water Conservation District (ACFC&WCD) for their review and approval. The Title Sheet of improvement plans shall be signed by the ACFCD prior to recordation of Parcel Map. mmm. The developer shall repair and/or replace any public improvements along Central Avenue if damaged during construction, to the satisfaction of the City Engineer. nnn. For the duration of all construction activities, the developer shall ensure that a water vehicle for dust control operations and a pick-up or vacuum type street sweeper to remove tracked dirt and debris from adjacent streets is kept readily available at all times during construction at the City Engineer's direction.
ooo. The developer shall implement the following measures for the duration of all construction activity to minimize air quality impacts:

1. Watering should be used to control dust generation during demolition of structures and break-up of pavement.

2. All trucks hauling demolition debris from the site shall be covered.

3. Dust-proof chutes shall be used to load debris into trucks whenever feasible. Watering should be used to control dust generation during transport and handling of recycled materials.

4. All active construction areas shall be watered at least twice daily and more often during windy periods; active areas adjacent to the existing land uses shall be kept damp at all times or shall be treated with non-toxic stabilizers or dust palliatives.

5. All trucks hauling soil, sand, and other loose materials shall be covered or require all trucks to maintain at least 2 feet of freeboard.

6. All unpaved access roads, parking areas, and staging areas at construction sites shall be paved, watered three times daily, or treated with (non-toxic) soil stabilizers.

7. All paved access roads, parking areas, and staging areas at construction sites shall be swept daily with water sweepers; water sweepers shall vacuum up excess water to avoid runoffrelated impacts to water quality.

8. Limit traffic speeds on unpaved roads to 15 mph.

9. Install sandbags or other erosion control measures to prevent silt runoff to public roadways.

Exhibit B: Conditions of Approval
Resolution No. ______ 24 of 30

10. Replant vegetation in disturbed areas as quickly as possible.

11. Minimize idling time (5 minutes maximum).

12. Maintain properly tuned equipment.

These measures shall be incorporated into the grading specifications as well as the best management practices of the storm water pollution prevention plan and shall be implemented to the satisfaction of the City Engineer.
ppp. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the project shall pollutants be allowed to enter, clog, or contaminate stormdrain pipe networks or open stormwater channels in violation of Newark Municipal Code. The applicant shall contain all trash and debris for proper disposal to authorized landfills or recyclers. Erosion control features shall be deployed during the rainy season that extends from October 1st to April 15th each year, or any time rain is forecast outside of this period. Best Management Practices (BMPs) shall be strictly followed. Street sweepers must be employed if soil or debris is tracked onto the public roads from vehicles exiting the site. Standard BMPs are available from the California Stormwater Quality Association (CASQA), the United States Environmental Protection Agency (EPA), Caltrans, and others. Notes and/or illustrations shall be added to the plans that describe the BMPs to be utilized during construction. The use of manufactured erosion control woven blankets and straw wattles that utilize plastic monofilament netting is specifically prohibited.
qqq. SWPPP REPORTING: Copies of any monitoring and/or sampling reports required by the stormwater pollution prevention plan (SWPPP) and submitted by the Legally Responsible Person (LRP) to the State of California’s SMARTS database shall also be submitted to the City of Newark inspector assigned to the project. The LRP shall also submit to the City a copy of the required Annual Report no later than September 1st of each year that construction is active or when erosion control features have been deployed. The report must include a summary of all sampling and analysis performed (Risk Levels 2 and 3 only), a log of all inspections performed including Rain Event Action Plans (REAP), a summary of any required corrective actions taken, and a summary of any violations.
rrr. TRAFFIC IMPACT STUDY: Transportation Impact Study prepared by Kimley-Horn, dated May 2025, identified a queuing deficiency at the northbound left-lane of intersection #5 at Cherry Street and Central Avenue. To correct the deficiency, the applicant shall be responsible for modifying signal phasing as per recommended by the approved Transportation Impact Study. The applicant shall be solely responsible for all costs associated with the traffic signal improvements. These traffic signal modifications shall be completed prior to the issuance of a Certificate of Occupancy or Temporary Certificate of Occupancy, whichever occurs first, for the project. The applicant shall submit improvement plans for the necessary modifications to the City for review and approval prior to the issuance of any Building Permit. sss.The applicant shall provide all required paper and digital submittals of the project parcel map, improvement plans, and as-built plans as required by the City Engineer, including but not necessarily limited to the following: (1) One full-sized mylar copy and an electronic copy of the recorded parcel map; (2) Two full-sized copies, four half-sized copies, and electronic Exhibit B: Conditions of Approval
Resolution No. ______ 25 of 30
copies of the approved improvement plans in a format approved by the City Engineer; (3) Electronic copies and one mylar set of the as-built improvement plans. All digital copies of the parcel map and improvement plans shall be prepared in accordance with Union Sanitary District digital submittal standards.
ttt. LANDSCAPE IMPROVEMENTS:

1. All landscape maintenance within the Landscape Easement shall be the sole responsibility of the property owner. The applicant shall enter into a Landscape Maintenance Agreement prior to the issuance of the building permit. The Landscape Maintenance Agreement shall run with the land and be binding on the property owner.

2. The landscape plans shall be included in the improvement plan set and shall be approved by the City Engineer prior to Parcel Map approval. landscape plans in accordance with the State of California Model Water Efficient Landscape Ordinance (MWELO) and per the Newark Municipal Code. Additionally, prior to project permit approvals, the applicant will be required to submit a completed City Landscape Document Package Review Checklist, which will be provided by the Engineering Department on request. Prior to Certificate of Occupancy, the applicant shall be required to submit a completed City Certificate of Completion Form. Prior to Building Permit issuance, submit the project Landscape Plans that demonstrate compliance to City of Newark requirements and MWELO requirements.

3. Prior to Building Permit issuance, the proposed tree species adjacent to the Central Avenue shall be shown on the plans in detail for review and approval, and coordinated with the City. The location of the trees on the project frontage along Central Avenue shall be approved by the City such that, at maturity, the tree canopies and root system do not impact the future City infrastructure.

4. Any above ground utility structures, including backflow prevention devices, and appurtenances, shall be installed within the applicant’s property line and a minimum of 10 feet behind street face of curbs. The backflow prevention devices shall have a green painted security cage to protect it from vandalism. These locations shall be screened with landscaping to the satisfaction of the City Engineer. The landscape screen shall not interfere with the utility companies’ or City Fire Department’s access.

5. A Deferred Improvement Agreement (DIA) for the landscape and irrigation improvements may be required based on construction schedules and the potential future City project on Central Avenue. A Reimbursement Agreement to cover City Attorney fees associated with the DIA is required.

Building Inspection Division
uuu. The project is currently subject to the 2022 California Building Standards, should the project not apply for permits before December 18th, 2025 the project will be subject to the code edition that is adopted at the time when it is applied for this includes all chapters of the building standards.
vvv. Per the CEQA guidelines, the number EV spaces shall meet the requirements of CalGreen Tier 2.

Alameda County Fire Department
Exhibit B: Conditions of Approval
Resolution No. ______ 26 of 30
www. Project must comply with all building and fire code requirements in effect at time of building permit submittal.
xxx. The flow test must be conducted no more than 12 months prior to the fire sprinkler plan submittal. The flow test data should be included with the fire sprinkler plan submission. yyy. A fire alarm system will be required in addition to the fire sprinkler system. zzz. Fire access and water supply must be in service prior to the commencement of vertical combustible construction.
aaaa. The building must be equipped with a fire pump. Please indicate the location and size of the fire pump room, in accordance with the California Fire Code and NFPA 20. bbbb. The project shall comply with all building and fire code requirements in effect at time of building permit.
cccc. The rolling tube steel gate shall not obstruct the fire apparatus access road. A Fire Department key box shall be provided at the gate entrance if the gate is manually operated, and a switch box shall be provided if the gate is electrically powered. dddd. The project shall comply with all building and fire code requirements in effect at time of building permit.
eeee. High pile storage shall be submitted as a deferred submittal to the Fire Department for review and approval.

Police Department
ffff. The development shall comply with Chapter 15.06, Security Code, of the Newark Municipal Code and Section 510, Emergency Responder Radio Coverage in New Buildings, of the California Fire Code.
gggg. We would highly recommend installation of community safety cameras in common areas where the facility would be most susceptible to criminal activity. This would include parking areas, exterior pathways and exterior doors. The community safety cameras could be operated and controlled by the owner or the Building Management. hhhh. We would highly recommend installation of a professionally monitored alarm system covering areas of the facility that would be most susceptible to criminal activity such as burglaries and cargo thefts. This would include parking areas, exterior pathways, gates, perimeter fencing as well as building windows and exterior doors. iiii.The proposed development should comply with the City of Newark numbering system and tie in with the existing area street numbering. Additionally, the proposed buildings should display their individual street address in a manner clearly visible from the adjacent roadway and parking areas in order to facilitate public safety personnel’s ability to quickly identify each location during emergency responses.

Exhibit B: Conditions of Approval
Resolution No. ______ 27 of 30
Environmental Conditions of Approval
jjjj. The following conditions of approval have been identified through this analysis and ensure implementation of applicable mitigation measures and policies set forth in the General Plan and its EIR.

AES-1: All exterior lighting shall comply with all applicable regulations in NMC §17.17.060 (Lighting and Illumination) and NMC Chapter 17.23 (Parking and Loading). All exterior lighting shall be directed on-site so as not to create glare offsite, as required by the Community Development Director.

AQ-1: The following dust control measures, as recommended by the Bay Area Air Quality Management District (BAAQMD), shall be included in the design of the proposed project and implemented during construction:

1. All exposed non-paved surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and access roads) shall be watered at least two times per day and/or non-toxic soil stabilizers shall be applied to exposed non-paved surfaces.

2. All haul trucks transporting soil, sand, or other loose material off-site shall be covered and/or shall maintain at least 2 feet of freeboard.

3. All visible mud or dirt tracked out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.

4. All vehicle speeds on unpaved roads shall be limited to 15 miles per hour.

5. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.

6. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes, as required by the California Airborne Toxics Control Measure (ATCM) Title 13, Section 2485 of California Code of Regulations. Clear signage regarding idling restrictions shall be provided for construction workers at all access points.

7. All construction equipment shall be maintained and properly tuned in accordance with the manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.

8. The prime construction contractor shall post a publicly visible sign with the telephone number and person to contact regarding dust complaints. The construction contractor shall take corrective action within 48 hours. The BAAQMD’s and the City’s phone numbers shall also be visible to ensure compliance with applicable regulations.

BIO-1: To avoid and minimize potential impacts to nesting birds including passerines and raptors, the following measures shall be implemented:

Exhibit B: Conditions of Approval
Resolution No. ______ 28 of 30

1. Grading or removal of potentially occupied habitat shall be conducted outside the nesting season, which occurs between approximately February 1 to August

31. 2. If grading between August 31 and February 1 is infeasible and groundbreaking must occur within the nesting season, a pre-construction nesting bird survey (migratory species, passerines, and raptors) of the potentially occupied habitat (trees, shrubs, grassland) shall be performed by a qualified biologist within 7 days of groundbreaking. If no nesting birds are observed no further action is required and grading shall occur within one week of the survey to prevent “take” of individual birds that could begin nesting after the survey.

3. If active bird nests (either passerine and/or raptor) are observed during the preconstruction survey, a disturbance-free buffer zone shall be established around the occupied habitat until the young have fledged, as determined by a qualified biologist. The radius of the required buffer zone can vary depending on the species, (i.e., 75-100 feet for passerines and 200-500 feet for raptors). The dimensions of any required buffer zones shall be determined by a qualified biologist.

4. To delineate the buffer zone around the occupied habitat, construction fencing shall be placed at the specified radius from the nest within which no machinery or workers shall intrude.

5. Biological monitoring of active nests shall be conducted by a qualified biologist to ensure that nests are not disturbed and that buffers are appropriate, adjusted by a qualified biologist as needed to avoid disturbance.

6. No construction or earth-moving activity shall occur within any established nest protection buffer prior to September 1 unless it is determined by a qualified ornithologist/biologist that the young have fledged (that is, left the nest) and have attained sufficient flight skills to avoid project construction zones, or that the nesting cycle is otherwise completed.

BIO-2: Prior to any tree removal or alteration, the applicant shall obtain a tree removal permit from the City of Newark Public Works Department and implement tree planting requirements in accordance with development review.

CUL-1: During project construction, if historic, archaeological or Native American materials or artifacts are identified, work within 50-foot radius of such find shall cease and the City shall retain the services of a qualified archeologist and/or paleontologist to assess the significance of the find. adopted with the certification of the 2013 FEIR because not all impacts in the Southwest Newark Residential and Recreational Focus Area may be reduced to less than significant levels.

If such find is determined to be significant by the archeologist and/or paleontologist, a resource protection plan conforming to CEQA §15064.5 shall be prepared by the archeologist and/or paleontologist and approved by the Community Development Director. The plan may include, but would not be limited to, removal of resources and similar actions. Project work may be resumed in compliance with such plan. If human remains are encountered, all ground disturbing activities near or in any area potentially overlying adjacent human remains shall cease, the County Exhibit B: Conditions of Approval
Resolution No. ______ 29 of 30
Coroner shall be contacted immediately, and the provisions of State law carried out.

GEO-1 Prior to issuance of a building permit, the applicant shall prepare and submit a design-level geotechnical report to the City for review and implement the recommendations herein, as approved by the City.

GHG-1: COA GHG-1 The Project shall comply with the most recent CalGreen Tier 2 EV requirements for non-residential projects and show the required number of EV spaces on the plans.

HAZ-1: Prior to issuance of any demolition permit, the applicant/project developer shall provide the City of Newark with evidence of approval by the ACWD of the Media Management Plan, titled “Data Gap Investigation and request for site closure”, dated September 13, 2023, prepared by Farallon Consulting and case closure.

HYD-1: Preliminary Stormwater Treatment Plan is approved in concept only. Final approval is subject to the applicant providing, prior to the issuance of the grading permit, the necessary plans, details, and calculations that demonstrate the plan complies with the Municipal Regional Stormwater NPDES Permit (MRP), Order R2-2022-0018, revised July 1, 2022, issued to the City of Newark by the Regional Water Quality Control Board, San Francisco Bay Region.

HYD-2: Prior to issuance of a building permit, the applicant shall prepare an Operations and Maintenance (O&M) Plan for post-construction water quality. The O&M Plan shall be reviewed and accepted by the City Engineer prior to Project Construction on the site.

NOI-1: The Applicant/Project Contractor shall implement the following noise reduction measures to minimize the impact of construction noise onto offsite receivers and demonstrate compliance to the satisfaction of the City of Newark Director of Public Works or City Engineer:

1. Construct solid plywood fences around ground level construction sites adjacent to the project property line, resulting in a decibel reduction of 5‐15 dBA.

2. ii. Equip all internal combustion engine‐driven equipment with intake and exhaust mufflers that are in good condition and appropriate for the equipment.

This would provide at least a 10 dBA reduction to individual equipment noise.

3. Prohibit unnecessary idling of internal combustion engines.

4. Locate stationary noise‐generating equipment such as air compressors or portable power generators as far as possible from the project property line.

Construct temporary noise barriers to screen stationary noise‐generating equipment at the project property line.

5. Utilize “quiet” air compressors and other stationary noise sources where technology exists.

6. Control noise from construction workers’ radios to a point where they are not audible at existing residences bordering the Project site.

Exhibit B: Conditions of Approval
Resolution No. ______ 30 of 30

7. Notify all adjacent businesses, residences, and other noise‐sensitive land uses of the construction schedule, in writing, and provide a written schedule of “noisy” construction activities to the adjacent land uses and nearby residences.

8. If complaints are received or excessive noise levels cannot be reduced using the measures above, erect a temporary noise control blanket barrier along surrounding building facades that face the construction sites.

9. Designate a “disturbance coordinator” who shall be responsible for responding to any complaints about construction noise. The disturbance coordinator shall determine the cause of the noise complaint (e.g., bad muffler, etc.) and shall require that reasonable measures be implemented to correct the problem.

Conspicuously post a telephone number for the disturbance coordinator at the construction site and include it in the notice sent to neighbors regarding the construction schedule.

NOI-2: Prior to issuance of a demolition permit or improvements plans, the Applicant shall prepare and submit the Construction Management plan to the City’s Building Department for review and shall make any modifications to the Plan for Building to find it acceptable. The Applicant/Project’s Contractor shall implement the Project’s Construction Management Plan included in the “Acoustical Assessment”, prepared for the Project by Kimley‐Horn and Associates, Inc., December 2023.

TRAN-1: Project improvements shall include a twice per cycle left-turn phase at the northbound left-turn lane of Cherry Street and Central Avenue.

UTIL-1: Prior to the issuance of a building permit, the applicant shall pay the applicable impact fees, in the amount in effect at the time.
20067033.2
6756 Central Ave – Newark 13 - Project Description
The project site is a 17.4-acre property (APNS: 092A-2165-014, -015, -016, and -017), located on the south side of Central Avenue at the intersection of Sycamore Street. Prologis, the Project Sponsor and Owner of the property, is proposing to demolish approximately 113,500 square feet of obsolete industrial buildings on site to construct a new industrial warehouse facility that can accommodate numerous uses that meet both the City and Prologis’ interests. The new facility will be approximately 315,390 sf and include up to 33,806 sf of office located along the north facade facing Central Avenue. The facility will feature one story of 40’-0” interior clear height. Parking will be provided on site to meet the requirements for the General Industrial and office uses (see Site Plan DR-2.0a for additional detail).

The project site’s general plan designation is General Industrial, and the zoning is GI – General Industrial.

This application seeks approval for indoor warehousing & storage as well as wholesaling & distribution via a conditional use permit (CUP). The site is bounded by Central Ave to the north, a railroad track to the west and south, and an industrial building to the east. The Project is currently speculative in nature with no tenant prospects as of the application date. Our intent is to transform an underutilized industrial outdoor storage yard into a Class A, state of the art industrial warehouse with approximately 300 new permanent jobs.

Design and Site Planning Intent
Construction will be high quality tilt-up concrete with metal panel accents providing for both solar shading and architectural interest. The project will meet or exceed the applicable development standards as detailed below. The architectural design and layout of the project was carefully designed with office areas to the front of the project while locating the loading dock area towards the rear of the project, so it is not visible from the public right of way. Glazing occurs high on the concrete tilt up panels providing natural light deep into the space. Extensive glazing, multiple reveals, multi-colored paint, and perforated metal panels are used as featuresthat break down the scale of concrete tilt up walls while providing a high image corporate design. The high image design is geared towards attracting a wide range of possible uses, dependent on market demand and fundamentals.

Extensive landscaping will be provided along the perimeter of the site, consisting of over 78,600 square feet including an outdoor employee amenity area, which will include seating, shade trees, eating tables, and paving with varying colors. 79 trees will be planted in addition to numerous shrubs and groundcovers, thus, vastly improving the existing condition which has minimal landscaping and trees.

Vehicles access would be provided by two driveways on Central Ave, 139’ feet apart from each other to make way for the future Central Ave overpass.

Future Central Avenue Access
The City of Newark has plans for an overpass along Central Avenue spanning the railroad lines located southwest of and adjacent to the Project Site. Construction of the overpass is expected to start with underground utilities in the 1st quarter of 2024 with an anticipated completion in the 3rd Quarter of 2027.

The length of the overpass extends from the west along Central Avenue across approximately 75% of the Project Site frontage, including the intersection of Sycamore Street and 2 existing curb cuts at the Project Site.
20067033.2
The Project Sponsor has been working closely with the city to ensure that the Project is able to maintain auto, fire and truck access to the Site after construction and during the city’s overpass construction. The Project Sponsor is proposing truck, fire and auto ingress and egress to the Project via two 40’ wide driveways at Central Ave. In addition, the project sponsor is providing various Temporary construction easements: 10’ wide easements for sewer, water, and maintenance; 30’ water line easement; and 10’ wide sidewalk easement in order to facilitate the future overpass construction. The project’s original design has been updated to accommodate the city’s future Central Ave Overpass improvements.

Traffic
Included with this application is a copy of a Transportation Impact Study completed by Kimley-Horn, dated June 2023. The project’s proposed trip generation was based on the highest trip generating land uses:
therefore, the equation for Research and Development (R&D) was used for the daily and AM peak hour and the rate for High Cube Fulfillment Center Warehouse-Sort was used for the PM peak hour, from the Institute of Transportation Engineer’s publication, Trip Generation Manual, 11th Edition.

The summary results of the study are as follows:

Vehicle Miles Traveled – less than significant impact.

Intersection Level of Service – no intersection project deficiencies were identified. However, the project creates a queuing deficiency at the northbound left-turn lane of the intersection at Cherry St. and Central Ave. in the AM and PM peak hours. It is recommended that a twice per cycle leftturn be provided for the north bound left-turn lane. In addition, the signal timing splits should be adjusted, and the cycle length should be modified to 150 seconds. With the recommended improvement, the project would add less than 25 feet of queue to the movement in comparison to existing conditions.

Proposed Findings: The zoning code imposes the following design and development standards in the GI zone.

Development Standard Project Compliance
Minimum Lot Size 20,000 The proposed building lot is 756,061 sf. Accordingly, the lot size complies
with the listed development
standards.

Minimum Lot Width 60 feet The proposed building lot is 600 feet wide at the narrowest point;
Accordingly, the lot width complies
with the listed development
standards.

Maximum Building Height 1.Within 400 feet of a residential district boundary: 100 feet.

The nearest residential zone is over
600 feet but less than 1,000 from 6750
Central Avenue. The maximum height
20067033.2

2.More than 400 feet but less
than 600 feet from a residential
district boundary: 150 feet.

3.More than 600 feet but less
than 1,000 from a residential
district boundary: 200 hundred
feet.

4.1,000 feet or more from a
residential district boundary: 500
feet or as approved through a
conditional use permit.
of the building therefore must not
exceed 200 feet.

Interior Clear height is 40’. The max
building roof height is 43’-6” and
maximum parapet height is 49-6” feet
in compliance with this standard.

Minimum Setbacks
Front 10 122 feet
Interior Side 15, 50 from a Residential District
boundary
78 feet
Street Side 15 122 feet
Rear 20, 50 from a Residential District
boundary
111 feet
Parking Spaces Office. One parking spot is
required per 300 sf of floor area.

With an office area of 33,806 sf,
the number of required parking
sports for the office is 113.
1 Most Manufacturing,
Warehousing, and Wholesaling
and Distribution. Industrial Uses
require one parking spot per
1,000 sf of floor area plus one
parking spot for each 5,000 sf of
outdoor use area. With a building
area of 315,390 sf, the number of
required parking spots is 282 plus
the parking spots required for
outdoor use area. The outdoor
The Project proposes 401 vehicle
parking spaces, which exceeds the
required parking of 395 parking spaces
by six vehicle spaces. The Project
proposes 48 loading spaces, which
exceeds the nine loading spaces the
city requires.
1 Section 17.26.030 of the Newark Municipal Code provides that "accessory uses and structures are also subject to the development and site regulations found in Chapter 17.17, General Site Regulations." Chapter 17.17 does not, however, specify any special off-street parking ratio requirements for accessory uses.
20067033.2
use area is equal to the total site
area, 756,061 sf minus the
building area, 315,390 sf, which
comes to 440,671 sf of outdoor
use area. The number of required
parking spots is thus 282 for a
warehousing facility. Accordingly,
the total number of required
parking spaces for the site,
accounting for accessory office
space, would be 395.

Newark Mun. Code § 17.23.040.

On-Site Loading Office. The number of required
loading spaces for an area of
315,390 sf is three. Newark Mun.

Code § 17.23.080(A)(1).

Most Manufacturing
Warehousing, and Wholesaling
and Distribution. The number of
required loading spaces for uses
with high loading demand—
including Warehousing and
Storage and Wholesaling and
Distribution facilities as well as
General Industrial, Light
Industrial, and Food and
Beverage Manufacturing
facilities—above 75,001 sf is five
loading spaces plus one
additional space for each
additional 75,000 sf over 75,000.

With an area of 315,390 sf, that
would be four additional spaces
for a total of nine loading spaces.

Accordingly, the total number of
required loading spaces is 12.

Newark Mun. Code §

17.23.080(A)(2).

The site plan contemplates 46 dock
doors and 2 grade level doors.

Accordingly, the project would satisfy
all loading space requirements.

Location of Required
Parking
Required parking spaces
regardless of the proposed use of
the building must be located on
the same lot, or located within
600 feet, along a pedestrian
route, of the principal entrance of
the building if accompanied by a
written agreement between the
The site plan contemplates 401 on-site
stalls, and thus the parking spaces are
appropriately located for all
contemplated industrial uses.
20067033.2
landowner and the city. Newark
Mun. Code § 17.23.060.

Bicycle Parking Spaces For commercial uses, the
Municipal Code requires 5% of the
number of required automobile
parking spaces, with a minimum of
four (4). For any establishment
with twenty-five or more full-time
equivalent employees must
provide one space per thirty
vehicle spaces. It requires that
each bicycle parking space is no
less than six (6) feet long by two (2)
feet wide and has a parking rack
capable of supporting bicycles of
various sizes in a vertical position.

Newark Mun. Code § 17.23.070
The bicycle parking requirement is
met as well. The Project proposes 20
short-term bicycle rack parking spaces
and 14 long-term bicycle lockers
onsite.

Therefore, the Project provides
adequate bicycle parking as required
by the city.

Additionally Supplemental
Regulations
A landscaped setback at least ten
feet wide between the parking
area and adjacent right-of-way.

The Project will comply because it will
provide an 11-foot-deep landscape
planter adjacent to the right-of-way
and extensive landscaping along the
perimeter of the site, consisting of
over 78,600 sf. This area will include an
outdoor employee amenity area,
which will include seating, shade trees,
eating tables, and paving with varying
colors.

Additionally Supplemental
Regulations
A minimum of one fifteen-gallon
tree and two five-gallon shrubs for
every forty feet of the street
frontage.
79 trees will be planted in addition to
numerous shrubs and groundcovers.

No specific plan nor area plan governs the development of the property; therefore, no additional design or development standards apply.

HWY 880
HWY 84

CENTRAL AVE
HWY 84

SYCAMORE ST
jacksonliles.com / 415.621.1799
COVER SHEET CU-0.0
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
6756 CENTRAL AVENUE, NEWARK, CA

CONDITIONAL USE PERMIT

PROJECT OVERVIEW
PROJECT LOCATION:
6756 CENTRAL AVENUE,
NEWARK, CA 94560
N.T.S.

VICINITY MAP

THIS PROJECT IN THE INDUSTRIAL ZONE OF NEWARK, CA PROPOSES TO DEMOLISH

EXISTING BUILDINGS AND STRUCTURES ON SITE AND CONSTRUCT A NEW INDUSTRIAL BUILDING. THE BUILDING WILL CONSIST OF APPROX. 281,000 SF OF MANUFACTURING/R&D AND/OR WAREHOUSE SPACE. APPROX. 33,000 SF OF

ACCESSORY OFFICE SPACE IS PROPOSED ALONG THE NORTH SIDE FACING CENTRAL AVENUE, AND TRUCK DOCKS ARE PROPOSED ALONG THE SOUTH.

CAR PARKING IS PRIMARILY LOCATED TO THE NORTH OF THE BUILDING, WITH

ADDITIONAL PARKING AT THE PERIMETER OF THE SITE AT THE EAST, WEST AND SOUTH. THE PROJECT PROPOSES TWO CURB CUTS LOCATED TO THE EAST OF THE FUTURE CENTRAL AVENUE OVERPASS.

CENTRAL AVENUE OVERPASS PROJECT (CITY PROJECT)

A FUTURE OVERPASS ALONG CENTRAL AVENUE IS PLANNED BY THE CITY, WHICH SPANS A LARGE PORTION OF THE FRONTAGE OF THE PROJECT SITE. WITH EXPECTED OVERPASS CONSTRUCTION START IN SUMMER OF 2024 AND COMPLETION IN EARLY 2026, EARLY CONSTRUCTION OF THE OVERPASS IS EXPECTED TO OVERLAP WITH THE INDUSTRIAL PROJECT CONSTRUCTION.

THE INDUSTRIAL PROJECT TEAM IS ENGAGED WITH THE CITY'S VARIOUS

DEPARTMENTS TO COORDINATE RELEVANT ASPECTS OF THE OVERPASS PROJECT WITH THE INDUSTRIAL PROJECT.

GENERAL
CU-0.0 COVER SHEET
CU-1.0 EXISTING SITE PLAN
CU-1.1 EXISTING SITE PHOTOS
CU-1.2 PRECEDENT IMAGES
CU-1.3 3D MASSING DIAGRAMS
CU-1.4 BUILDING PERSPECTIVES
CU-1.5 PRELIMINARY MATERIALS
CU-1.6 EXTERIOR COLORS AND MATERIALS
SURVEY
SHEET 1 ALTA/NSPS LAND TITLE SURVEY
SHEET 2 ALTA/NSPS LAND TITLE SURVEY
CIVIL
EX1 TOPOGRAPHIC SURVEY
EX2 EASEMENTS & PROPERTY LINES
EX3 CONCEPTUAL GRADING
EX4 CONCEPTUAL UTILITIES
EX5 CONCEPTUAL SWQCP
EX6 SITE DRAINAGE EXHIBIT
EX7 TIDAL INFLUENECE EXHIBIT

LANDSCAPE
LC-1.1 PRELIMINARY LANDSCAPE PLAN
LC-2 PRELIMINARY LANDSCAPE PLAN

SHEET INDEX
ARCHITECT:

JACKSON LILES ARCHITECTURE
2325 THIRD STREET, #206
SAN FRANCISCO, CA 94107
T 415.621.1799

BRIAN LILES, AIA

JACQUELINE ARMADA, AIA

PROJECT TEAM
CLIENT:

PROLOGIS
PIER 1, BAY 1
SAN FRANCISCO, CA 94111
T 415.394.9000

JIM JEARY

CORY CHUNG
CIVIL:

KIER + WRIGHT
163 TECHNOLOGY DRIVE, SUITE 150
IRVINE, CA 92618
T 949.508.0202
GARRETT READLER, PE, QSD + QSP

ALEX PARDY
LANDSCAPE:

GREEN DESIGN LANDSCAPE
ARCHITECTS, INC.
1464 POPINJAY DRIVE

RENO, NV
T 775.829.1364

BARBARA HATCH, RLA ASLA

ARCHITECTURAL
CU-2.0a PROPOSED SITE PLAN
CU-2.0c ENLARGED EASEMENT SITE PLAN
CU-2.1 FLOOR PLAN - LEVEL 1
CU-2.2 FLOOR PLAN - MEZZANINE
CU-2.3 ROOF PLAN
CU-2.4 ENLARGED PLAN - OUTDOOR

AMENITY
CU-2.5 ENLARGED ELEVATIONS - OUTDOOR

AMENITY
CU-2.6 ENLARGED PLAN - PARKING STALLS
CU-2.7 ENLARGED PLAN - MAIN ENTRY
CU-3.1 NORTH & WEST ELEVATIONS
CU-3.2 SOUTH & EAST ELEVATIONS
CU-4.1 BUILDING SECTIONS
CU-6.1 TRASH ENCLOSURE DETAILS
CU-6.2 SITE FIXTURE DETAILS

APPENDIX
CU-A.1 APPENDIX 1 - LONG HAUL TRUCK

TURNING

CENTRAL AVENUE
A
C

D E F G
H J
K L
L

SYCAMORE
STREET
2 3 TYP
(E) BUILDINGS - GROUP 1
(E) BUILDINGS - GROUP 2
(E) BUILDINGS - GROUP 3
(E) BUILDINGS -
GROUP 4
1 4
4 4
4 6
7 5
2 2 2
(E) ADJACENT BLDG(E) ADJACENT BLDG
(E) ADJACENT BLDG
(E) ADJACENT
BLDG
(E) ADJACENT BLDG
(E) ADJACENT BLDG
(E) ADJACENT
BLDG
(E) ADJACENT BLDG
1 (E) BUILDING
2 (E) CURB CUT
3 (E) FENCING
4 (E) BUILDING RECENTLY DEMOLISHED UNDER SEPERATE
PERMIT
5 (E) 10' WIDE SEWER AND WATER EASEMENT IN FAVOR OF
SOUTHERN PACIFIC COMPANY. EASEMENT TO REMAIN IN

PROJECT
6 (E) 4' WIDE ROADWAY AND PUBLIC UTILITY EASEMENT IN
FAVOR OF THE CITY OF NEWARK. EASEMENT TO REMAIN

IN PROJECT
7 (E) EASEMENT FOR PRIVATE ACCESS AND EMERGENCY
VEHICLE ACCESS. EASEMENT TO BE REMOVED
jacksonliles.com / 415.621.1799
1" = 60'-0"
EXISTING SITE PLAN CU-1.0
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 60'-0" 1

EXISTING SITE PLAN

ZONING DESIGNATION
PERMITTED USES:

CONDITIONAL USES:

MINOR USES:

ZONING CONTROL
MAX. HEIGHT:

FAR:

SETBACKS:

PARKING REQUIRED:

BICYCLE PARKING REQUIRED:

GENERAL INDUSTRIAL

LARGE VEHICLE & EQUIPMENT SALES,
SERVICES RENTAL; BUILDING MATERIAL
SALES; CONSTRUCTION & MATERIALS
YARD; GENERAL INDUSTRIAL; LIGHT
INDUSTRIAL; RESEARCH &
DEVELOPMENT; LIGHT FLEET-BASED

SERVICES

BUSINESS, PROFESSIONAL &
TECHNOLOGY; INDOOR WAREHOUSING
& STORAGE; WHOLESALING &
DISTRIBUTION; FREIGHT/TRUCKING

TERMINALS

BUSINESS SERVICES
200'
NONE
10' FRONT
15' INTERIOR SIDE
15' STREET SIDE
20' REAR
10' LANDSCAPE BETWEEN PARKING &
ROW
1:300 OFFICE;
1:1,000 INDUSTRIAL USES
LONG TERM:
1 SPACE PER 30 VEHICLE SPACES
SHORT TERM:
5% OF REQ'D VEHICLE SPACES

PLANNING CODE SUMMARY
NOTES
RN
A. NORTHWEST AERIAL VIEW
B. SOUTHEAST AERIAL VIEW
C. WEST OF SITE LOOKING SOUTH D. NORTHWEST CORNER OF SITE E. WEST CENTRAL AVENUE LOOKING NORTH F. SYCAMORE STREET LOOKING NORTH G. CENTRAL AVENUE LOOKING WEST H. CENTRAL AVENUE LOOKING SOUTHEAST J. EAST CENTRAL AVENUE LOOKING NORTH K. NORTHEAST CORNER OF SITE L. EAST OF SITE LOOKING SOUTH jacksonliles.com / 415.621.1799
EXISTING SITE PHOTOS CU-1.1
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
jacksonliles.com / 415.621.1799

PRECEDENT IMAGES CU
-1.2
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE

CENTRAL AVE

FUTURE OVERPASS

CENTRAL AVE

FUTURE OVERPASS

TRUCK COURT

PARKING
jacksonliles.com / 415.621.1799
3D MASSING DIAGRAMS CU-1.3
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1 3D MASSING - NORTH 23D MASSING - SOUTH
jacksonliles.com / 415.621.1799
BUILDING PERSPECTIVES CU-1.4
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE

PERSPECTIVE RENDERING - VIEW OF EAST BUILDING ENTRANCE PERSPECTIVE RENDERING - AERIAL VIEW jacksonliles.com / 415.621.1799
PRELIMINARY MATERIALS CU-1.5
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE

PAINTED CONCRETE - BUILDING ACCENTS

PAINTED CONCRETE - BUILDING EXTERIOR WALLS

GLAZING - OFFICES AND CLERESTORY WINDOWS

PERFORATED METAL PANEL - WIDOW ACCENT
"FINS"

CONCRETE - BUILDING ACCENT AREAS

CEMENT BOARD FENCING - OUTDOOR AMENITY

PATTERNED CONCRETE PAVING - OUTDOOR AMENITY

PUBLIC ART - PERFORATED PANEL

CONCRETE PLANTERS - SELECT SITE LANDSCAPING

MATERIAL & COLOR SWATCHES SITE MATERIAL INSPIRATION

PAINTED CONCRETE - BUILDING EXTERIOR WALLS

TO TOP OF POST
6' - 0"

TO TOP OF POST
6' - 0"

TO TOP OF POST
3' - 0"

TO TOP OF POST
6' - 0" MAX
VARIES
~ 1'-6" - 2'
SEE EX3
jacksonliles.com / 415.621.1799
EXTERIOR COLORS AND CU-1.6
MATERIALS 01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE

BLACK TUBE STEEL FENCE - PROPERTY LINE & VEHICLE GATE

CONCRETE SEAT WALL - OUTDOOR AMENITY

SITE MATERIAL INSPIRATION

PERFORATED METAL PANEL W/ STL FRAME & AMENITY ENTRANCE GATE - OUTDOOR AMENITY

PRE-FINISHED METAL CANOPY
1/2" = 1'-0" 1
6' TUBE STEEL FENCE - ELEVATION
1/2" = 1'-0" 3

CHAIN LINK FENCE - ELEVATION
1/2" = 1'-0" 2
3' TUBE STEEL FENCE - ELEVATION

CONCRETE RETAINING WALL AT BIORETENTION PLANTER

PRE-FINISHED METAL CANOPY

FENCE TYPE LEGEND

PERFORATED METAL PANEL - OUTDOOR AMENITY

MATERIAL & COLOR SWATCHES
1/2" = 1'-0" 4

CHAIN LINK FENCE ON CONC RETAINING WALL - ELEVATION

PARCEL 4 PARCEL 3 PARCEL 2 PARCEL 5 CENTRAL AVENUE
U.P.R.R.

TOPOGRAPHIC SURVEY EX1
2850 Collier Canyon Road
Livermore, CA 94551
Phone: (925) 245-8788
www.kierwright.com JAN 22, 2025 OF 7 SHEETS SHEET DATE SCALE DESIGNER JOB NO. A12586-6 NO. REVISION NO. BY REVISION BY

PROLOGIS
6750 CENTRAL AVENUE APNEWARK, CALIFORNIA
OF

FOR DRAWN BY MRF
” AS SHOWN NOTES
NORTH LEGEND LOCATED ON OR ADJACENT TO IT. NOTE: THIS SITE HAS FIBER OPTIC LINES ABBREVIATIONS

CENTRAL AVENUE
U.P.R.R.

EASEMENTS AND PROPERTY LINES EX2
2850 Collier Canyon Road
Livermore, CA 94551
Phone: (925) 245-8788
www.kierwright.com JAN 22, 2025 OF 7 SHEETS SHEET DATE SCALE DESIGNER JOB NO. A12586-6 NO. REVISION NO. BY REVISION BY

PROLOGIS
6750 CENTRAL AVENUE APNEWARK, CALIFORNIA
OF

FOR DRAWN BY MRF AS SHOWN

NORTHLEGEND
PARCEL 4 PARCEL 3 PARCEL 2 PARCEL 5 CENTRAL AVENUE
U.P.R.R.

CONCEPTUAL GRADING EX3
2850 Collier Canyon Road
Livermore, CA 94551
Phone: (925) 245-8788
www.kierwright.com JAN 22, 2025 OF 7 SHEETS SHEET DATE SCALE DESIGNER JOB NO. A12586-6 NO. REVISION NO. BY REVISION BY

PROLOGIS
6750 CENTRAL AVENUE APNEWARK, CALIFORNIA
OF

FOR DRAWN BY MRF AS SHOWN
NORTH FF 23.5 LEGEND EARTHWORK SUMMARY

CENTRAL AVENUE
U.P.R.R.

CONCEPTUAL UTILITIES EX4
2850 Collier Canyon Road
Livermore, CA 94551
Phone: (925) 245-8788
www.kierwright.com JAN 22, 2025 OF 7 SHEETS SHEET DATE SCALE DESIGNER JOB NO. A12586-6 NO. REVISION NO. BY REVISION BY

PROLOGIS
6750 CENTRAL AVENUE APNEWARK, CALIFORNIA
OF

FOR DRAWN BY MRF AS SHOWN

NORTHLEGEND
1 13.40

32.16 21.79
CONCEPTUAL SWQCP EX5
NORTH
2850 Collier Canyon Road
Livermore, CA 94551
Phone: (925) 245-8788
www.kierwright.com JAN 22, 2025 OF 7 SHEETS SHEET DATE SCALE DESIGNER JOB NO. A12586-6 NO. REVISION NO. BY REVISION BY

PROLOGIS
6750 CENTRAL AVENUE APNEWARK, CALIFORNIA
OF

FOR DRAWN BY MRF AS SHOWN CONCEPTUAL SIZING CALCULATIONS LEGEND XX.XX
SITE DRAINAGE EXHIBIT EX6
NORTH
2850 Collier Canyon Road
Livermore, CA 94551
Phone: (925) 245-8788
www.kierwright.com JAN 22, 2025 OF 7 SHEETS SHEET DATE SCALE DESIGNER JOB NO. A12586-6 NO. REVISION NO. BY REVISION BY

PROLOGIS
6750 CENTRAL AVENUE APNEWARK, CALIFORNIA
OF
FOR DRAWN BY MRF AS SHOWN SITE SURFACE COMPARISON LEGEND PRE-DEMOLITION SITE SURFACE POST-DEVELOPMENT SITE SURFACE NOTE: AFTER THE IMPROVEMENTS HAVE BEEN INSTALLED, THE SITE WILL HAVE A GREATER AMOUNT OF PERVIOUS SURFACE AREA THAN PRIOR TO REDEVELOPMENT. AS SUCH, STORM WATER RUNOFF FROM THE SITE WILL DECREASE COMPARED TO THE PRE-DEVELOPMENT CONDITION.

TIDAL INFLUENCE EXHIBIT EX7
NORTH
2850 Collier Canyon Road
Livermore, CA 94551
Phone: (925) 245-8788
www.kierwright.com JAN 22, 2025 OF 7 SHEETS SHEET DATE SCALE DESIGNER JOB NO. A12586-6 NO. REVISION NO. BY REVISION BY

PROLOGIS
6750 CENTRAL AVENUE APNEWARK, CALIFORNIA
OF

FOR DRAWN BY MRF AS SHOWN CENTRAL AVENUE

CENTRAL AVENUE CENTRAL AVENUE

PLUMMER CREEK

SYCAMORE STREET

UNION PACIFIC RAILROAD MORTON AVENUE
CENTRAL AVENUE 50 50 50 50 50 50 505050 50 50 50 50 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100100 100 100 100 100 100 100100 100 100 50 LOW TO MEDIUM FLOWERING SHRUBS w/ ACCENT PERENNIALS PARKING LOT SCREEN SHRUBS WHERE REQUIRED FRONTAGE PLANTING LOW SHRUBS GROUNDCOVER MEANDERING GROUPS OF ORNAMENTAL GRASSES W/ BOULDERS PROJECT ACCENT PLANTING FLOWERING SHRUBS & GROUND-COVERS, PERENNIAL ACCENT SCREEN / FOUNDATION PLANTING LARGE SHRUBS MEDIUM BROADLEAF EVERGREEN TREE LARGE DECIDUOUS SHADE TREE LANDSCAPE LEGEND SEEDED PER NATIVE BIO-RETENTION GRASSES HYDROSEED MIX FLOWERING ACCENT TREE LARGE EVERGREEN SHADE TREE PARKING EVERGREEN SCREEN SHRUB CHINESE PISTACHE, FRONTIER ELM HOLLY OAK BAY LAUREL OR FRUITLESS OLIVE CRAPE MYRTLE COFFEEBERY, SALVIA Owner: Project:

Project Number: Revision: Date: Drawn by: Title: Sheet: 0 12/9/21 Newark, CA Central Avenue TEL: (510) 661-4000 3353 GATEWAY BLVD. FREMONT, CA 94538-6526B.H. 1464 Popinjay Drive Reno, NV. email: [email protected] p: 775 829 1364 REVISED 10-31-22 REVISED 2-10-23 REVISED 5-16-23 REVISED 11-8-23 PRELIMINARY LANDSCAPE PLAN SCALE: 1" = 50' LC1.1 PRELIMINARY LANDSCAPE PLAN TOTAL SITE AREA: 756,100 S.F. TOTAL LANDSCAPE AREA PROVIDED (10.4%): 78,600 S.F. FRONT AND STREET FACING SETBACK LANDSCAPE: (PROVIDED) TOTAL PARKING AREA: 157,484 S.F. PARKING AREA LANDSCAPE REQUIRED (10%): 15,749 S.F. PARKING AREA LANDSCAPE PROVIDED (18%): 28,609 S.F. TOTAL SHADE REQUIRED (50%): 79,742 S.F. TOTAL SHADE PROVIDED (55%): 89,865 S.F. 65 TREES @ 100% 40' DIAMETER (1257 S.F.) = 81,705 S.F. 13 TREES @ 50% 40' DIAMETER (628 S.F.) = 8,164 S.F. PARKING AREA SPACES PROVIDED: 399 TREES REQUIRED (1 TREE/8 STALLS) : 50 TREES PROVIDED : 79 LANDSCAPE CALCULATIONS QUERCUS ILEX HOLLY OAK 24" BOX VL 40' X 40' OLEA EUROPAEA 'SWAN HILL' FRUITLESS OLIVE 15 GAL. L 20' X 25' PISTACIA C. 'KEITH DAVEY' CHINESE PISTACHE 24" BOX L 50' X 40' ULMUS 'FRONTIER' FRONTIER ELM 24" BOX L 50' X 60' LAGERSTROEMIA 'DYNAMITE RED' CRAPE MYRTLE 15 GAL. L 15' X 15' LAURUS N. 'SARATOGA' SWEET BAY 15 GAL. L 25' X 20' TREES FESTUCA MAIREI ATLAS FESCUE 1 GAL. L 2' X 3' PENNISETUM S. 'HAMMILIN' DW. FOUNTAIN GRASS 1 GAL. L 3' X 3' LOMANDRA L. 'BREEZE' BREEZE MAT RUSH 1 GAL. L 3' X 3' MUHLENBERGIA RIGENS DEER GRASS 1 GAL. L 4' X 4' GRASSES OLEA 'LITTLE OLLIE" DW. FRUITLESS OLIVE 5 GAL. L 6' X 6' NERIUM OLEANDER 'PETITE SALMON' PETITE OLEANDER 5 GAL. L 5' X 5' RHAMNUS C. 'MOUND SAN BRUNO' COFFEEBERRY 5 GAL. L 4' X 5' CALLISTEMON 'LITTLE JOHN' DW. BOTTLEBRUSH 5 GAL. L 3' X 4' ROSMARINUS O. 'COLLINGHAM INGRED' ROSEMARY 5 GAL. L 4' X 4' CISTUS X 'SKANBERGII' SKANBURG ROCKROSE 5 GAL. L 3' X 5' SALVIA C. 'POZO BLUE' CLEVELAND SAGE 5 GAL. L 3' X 3' LEUCOPHYLLUM F. 'COMPACTA' TEXAS RANGER 5 GAL. L 5' X 5' MYOPORUM P. 'PUTAH CREEK' PUTAH CREEK MYOPORUM 1 GAL. L 1' X 7' HESPERALOE PARVIFLORA RED YUCCA 5 GAL. L 3' X 3' BACCHARUS P. 'CONSANQUINEA' COYOTE BRUSH 5 GAL L 2' X 6' LANTANA 'DWARF YELLOW' DWARF YELLOW LANTANA 1 GAL L 2' X 5' 'WESTRINGIA F. 'GREY BOX' DW. COAST ROSEMARY 1 GAL L 2' X 3' SALVIA C. 'AROMAS' CLEVELAND SAGE 5 GAL. L 4' X 6' DODONEA VISCOSA HOPBUSH 5 GAL. L 10' X 10' HEMEROMELES ARBUTIFOLIA TOYON 5 GAL VL 8' X 12' CEANOTHUS 'RAY HARTMAN' CEANOTHUS 5 GAL. L 6' X 8' ARBUTUS U. 'COMPACTA' DW. STRAWBERRY 5 GAL, L 8' X 10' EVERGREEN SCREENING SHRUBS TULBAGHIA V. 'TRICOLOR' SOCIETY GARLIC 1 GAL. L 1' X 1.5' VERBENA LILACINA 'DE LA MINA' VERBENA 1 GAL. L 2' X 4' ACHILLEA 'MOONSHINE YARROW 1 GAL. L 2 X 2 DIETES V. 'VARIEGATA' FORT NIGHT LILY 1 GAL. L 3' X 3' HYDROZONE TREES BOTANICAL NAME COMMON NAME SIZE WATER REGIME MATURE HABIT H X W PRELIMINARY PLANT LIST SHRUBS PERENNIALS HYDROZONE BOTANICAL NAME COMMON NAME SIZE WATER REGIME MATURE HABIT H X W PRELIMINARY PLANT LIST 3" MINIMUM DEPTH OF 1" MINUS MOCHA ROCK COMBINATION OF MULCHES TO BE UTILIZED IN FINAL DESIGN 3" MINIMUM DEPTH OF DARK BROWN BARK MULCH LEGEND 2'-4' DIA. FRACTURED ROCK BOULDERS. BOULDER COLOR AND TEXTURE TO BLEND WITH ROCK MULCH. NOT SHOWN NOT SHOWN I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE 2015 WATER EFFICIENT LANDSCAPE ORDINANCE AND SHALL SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE BARBARA M. HATCH ASLA AUTOMATIC CONTROLLER W/ ET DATA, REPEAT CYCLING IRRIGATION ZONES PER PLANT WATER REQUIREMENTS RAIN SENSOR SENSOR TO IS SPECIFIED SOIL AMENDMENTS TO BE INCORPORATED PLANTER SURFACE AREAS TO BE MULCHED WATER USAGE TO MEET STATE WATER EFFICIENT LANDSCAPE STANDARD LARGE PARKING AREA SHADE TREE - TYP.BIO- RETENTION BASIN PER CIVIL PROJECT ACCENT PLANTING AT ENTRIES - TYP. PARKING AREA SCREEN - TYP. OUTDOOR AMENITY AREA PER ARCH. PLANS ACCENT PLANTING AT OFFICE FRONTAGES - TYP. LARGE BROADLEAF EVERGREEN TREE - TYP. SCREEN PLANTING AROUND TRANSFORMER OUTDOOR AMENITY AREA PER ARCH. PLANS Owner: Project:

Project Number: Revision: Date: Drawn by: Title: Sheet: 0 12/9/21 Newark, CA Central Avenue TEL: (510) 661-4000 3353 GATEWAY BLVD. FREMONT, CA 94538-6526B.H. 1464 Popinjay Drive Reno, NV. email: [email protected] p: 775 829 1364 REVISED 10-31-22 REVISED 2-10-23 REVISED 5-16-23 REVISED 11-8-23 PRELIMINARY IRRIGATION CALUCLATIONS LC2 PRELIMINARY LANDSCAPE PLAN

CENTRAL AVEFUTURE CENTRAL AVE OVERPASS SYCAMORE ST

TRUCK COURT
(N) BUILDING

TRAILER STORAGE

PARKING PARKING

PARKING
1 19
8 15
6 13
16 8

EXTENT OF FUTURE CENTRAL AVE OVERPASS
11 25 STALLS
17 CU-2.0c
1 78 STALLS 44 STALLS
7 STALLS
3 STALLS
6 STALLS
2 6
S
TA
L
L
S
9 S
TA
L
L
S
20 STALLS
21 STALLS
30 STALLS
14'
25'19'19'26'19'
TYP
9'
4 6 ACC. STALLS

FOR EASEMENTS,

SEE ENLARGED

EASEMENT SITE
PLAN
5 3 19
11'
8'
5'
8'
7 7
9 19
3 19
3 21
3 12
10 12
8 19
18 111'
78'
78'
(E) ADJACENT BLDG(E) ADJACENT BLDG
(E) ADJACENT BLDG
(E) ADJACENT
BLDG
(E) ADJACENT BLDG
(E) ADJACENT BLDG
(E) ADJACENT
BLDG
196'
(E) ADJACENT BLDG
4 ACC.

STALLS
303'166'
1000'
340'
122'
14 2
19 TYP
12'
74' TYP

C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T C O M P A C T 78 COMPACT STALLS 11 COMPACT STALLS
2 10
26'
40'
25'
3'
7'
7'
19' TYP
20 20' MIN

C OM P A C T C OM P A C T C OM P A C T C OM P A C T C OM P A C T C OM P A C T 2 17
2 40'
20 CU-2.6
1 CU-2.6
2 22 STALLS
6 C
O
M
P
A
C
T
S
TA
L
L
S
CU-2.7
1 CU-2.4
1 16
2 0'
29'
40' 139' 40'
GENERAL NOTES:

1. AN AUTOMATIC SPRINKLER SYSTEM

WILL BE INSTALLED THROUGHOUT THE
BUILDING PER NFPA-13 STANDARDS.

2. WATER EFFICIENT PLUMBING

FIXTURES AND IRRIGATION SHALL BE
IMPLEMENTED PER ACWD MEASURES.

SPECIFIC NOTES:
1 NEW OVERPASS AT CENTRAL

AVENUE AND SYCAMORE STREET
2 6' HIGH PREFINISHED VERTICAL
TUBE STEEL FENCE. SEE CU-1.6 FOR

IMAGE & ELEVATION
3 LANDSCAPING PROVIDED WITHIN

FRONT SETBACK AND AT SIDE AND

REAR PROPERTY LINES, SEE

LANDSCAPE PLAN
4 NO FENCE AT PORTION OF

FRONTAGE ADJACENT TO

OVERPASS WALL OR AT GRADE

PORTION OF CENTRAL AVE
5 RETAINING WALL W/ CHAIN

LINK FENCE ABOVE
6 TRANSFORMER LOCATION.

EQUIPMENT SHALL BE SCREENED

FROM PUBLIC VIEW WITH TREES AND
LANDSCAPING. TRANSFORMER TO

BE PAINTED DARK GREEN TO BLEND

IN WITH SURROUNDING LANDSCAPE
AREA.
9 HATCHED AREA INDICATES 10'

WIDER SEWER AND WATER

EASEMENT IN FAVOR OF SOUTHERN

PACIFIC COMPANY
12 CURB CUT PER CITY STANDARD

PLANS, SEE CIVIL DRAWINGS FOR

ADDITIONAL DETAILS
11 CROSSWALK
13 EMPLOYEE OPEN SPACE, SEE
CU-2.4 & CU-2.5
14 LONG TERM BICYCLE LOCKERS. SEE
DR-6.2 FOR DETAILS
15 TRASH ENCLOSURE
16 ACCESSIBLE ROUTE TO BUILDING

ENTRANCE
17 SHORT TERM BICYCLE PARKING, SEE
CU-6.2 FOR DETAILS
18 PER NMC SECTION 17.23.090(G)(2),
COMPACT STALL TO UTILIZE 2'
OVERHANG OVER LANDSCAPING.

STALL TO BE LABELED "COMPACT,"
TYP
10 ROLLING TUBE STEEL GATE TO

REMAIN OPEN DURING BUSINESS
HOURS
8 STORMWATER PLANTER AREA
7 SLOPED GRADING AT SIDES OF

BUILDING DOWN TO LOWERED

TRUCK COURT
19 6' HIGH CHAIN LINK FENCE AT

PROPERTY LINE
20 SEE CU-2.6 FOR ENLARGED PARKING
PLAN
21 3' HIGH PREFINISHED VERTICAL

TUBE STEEL FENCE AT PROPERTY
LINE. SEE CU-1.6 FOR IMAGE &

ELEVATION

DOCK DOOR

DRIVE IN DOOR

C O M P A C T COMPACT PARKING STALL

ACCESSIBLE PARKING STALL

SITE LIGHTING FIXTURE STANDARD PARKING STALL
jacksonliles.com / 415.621.1799
1" = 60'-0"
PROPOSED SITE PLAN CU-2.0a
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 60'-0" 1

PROPOSED SITE PLAN
NOTES
LEGEND
RN
INDUSTRIAL 281,584 SF
OFFICE 33,806 SF
TOTAL 315,390 SF
SITE AREA IN S.F. 756,061 SF
IN ACRES 17.4 ACRES

BUILDING AREA
COVERAGE 37.6 %

PROJECT INFORMATION
REQUIRED OFFICE (1/300 SF) 113
INDUSTRIAL (1/1000 SF) 282
TOTAL 395
PROVIDED STANDARD (9 x 19') 291
ACCESSIBLE (9' x 19') 10
COMPACT (8'-6" x 14') 95
TOTAL 396

ON-SITE PARKING SPACES
REQUIRED LONG-TERM (1:30 VEHICLE SPACES) 14
SHORT-TERM (5% OF REQ'D VEHICLE SPACES) 20
PROVIDED BIKE LOCKERS (LONG-TERM) 14
SHORT-TERM 20

BICYCLE PARKING
REQUIRED LOADING SPACES 9
(5 SPACES / FIRST 75,000 SF, THEN
1 SPACE / EACH ADDITIONAL 75,000 SF)
PROVIDED DOCK DOORS 46
DRIVE-IN DOORS 2

LOADING SPACES

ZONING DESIGNATION GENERAL INDUSTRIAL
MAXIMUM BUILDING HEIGHT ALLOWED 200 FT

MAXIMUM FLOOR AREA RATIO NONE
SETBACKS FRONT 10 FT
SIDE 15 FT
REAR 20 FT
ZONING

BUILDING AND SITE AREA
4' WIDE (E) PUE

FOR ROADWAY
10' 4'
10'

STORMWATER PLANTER

STORMWATER PLANTER
10' EASEMENT FOR MAINTENANCE. SEE

CIVIL DRAWINGS FOR ADDITIONAL INFO
(E) 10' WIDE SEWER AND WATER

EASEMENT IN FAVOR OF SOUTHERN

PACIFIC COMPANY
1 10' WIDE TCE FOR CENTRAL OVERPASS
CONSTRUCTION. SEE CIVIL DRAWINGS

FOR ADDITIONAL INFO
30' WIDE WATER LINE EASEMENT. SEE

CIVIL DRAWINGS FOR ADDITIONAL INFO

FUTURE CENTRAL AVE OVERPASS SYCAMORE ST
30'
20'
10' WIDE SIDEWALK EASEMENT
2 2
PROPOSED 18" SEWER

CONNECTIONS
2 PROPOSED 6" SEWER
CONNECTION TO (E) 10"

TEMPORARY CONSTRUCTION

EASEMENT - ACCESS ONLY
jacksonliles.com / 415.621.1799
NOTES
1" = 40'-0"
ENLARGED EASEMENT SITE CU-2.0c
PLAN 01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 40'-0" 1

ENLARGED EASEMENT SITE PLAN
RN
GENERAL NOTES:

1. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION

RELATED TO PROPOSED EASEMENTS

2. NOTE THAT THE EASEMENT CONFIGURATIONS ARE

UNDER DISCUSSION WITH THE CITY AND HAVE NOT BEEN

FINALIZED
1 (N) WATER LINE ALIGNMENT WITHIN WATER LINE

EASEMENT
SPECIFIC NOTES:
2 (N) WATER LATERAL
55'55'55'60'
46' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 58' 1000'
1 TYP
3 4
6 6
TYP 12

INDUSTRIAL
(281,180 SF)
OFFICE
(16,630 SF)

TRUCK COURT
5 3 TYP 3 TYP
3 TYP
9 9 3 303'
60' 28' 27' 23'
363'

RESTROOMS

RESTROOMS

RESTROOMS
253' 50'

RESTROOMS

FUTURE CENTRAL AVE OVERPASS CENTRAL AVE
2 10 10
7 336'
1000'
GENERAL NOTES:

1. AN AUTOMATIC SPRINKLER SYSTEM WILL BE

INSTALLED THROUGHOUT THE BUILDING PER
NFPA-13 STANDARDS.

2. WATER EFFICIENT PLUMBING FIXTURES AND

IRRIGATION SHALL BE IMPLEMENTED PER ACWD
MEASURES.
1 TILT UP SLAB CONSTRUCTION, TYP AT BUILDING

EXTERIOR
2 SLAB ON GRADE
3 LANDSCAPING, SEE LANDSCAPE PLAN
4 MEZZANINE ABOVE 10 STAIR OPEN TO OFFICE
11 ENCLOSED MEZZANINE LEVEL
7 OUTDOOR AMENITY, SEE SHEET CU-2.4
8 STAIR OPEN TO OFFICE
9 LINE OF CANOPY ABOVE
6 VEHICLE/FORK LIFT RAMP
5 TRANSFORMER LOCATION
12 EXTERIOR STAIR
SPECIFIC NOTES: DOCK DOOR

DRIVE IN DOOR

SITE LIGHTING FIXTURE
jacksonliles.com / 415.621.1799

NOTES LEGEND
1" = 40'-0"
FLOOR PLAN - LEVEL 1 CU-2.1
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 40'-0" 1
FLOOR PLAN - LEVEL 1
RN

MEZZANINE OFFICE
(16,630 SF)
46' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 58' 1000'
55'55'55'60'

OPEN TO
BELOW
60' 28' 27' 23'
363'
11 9

RESTROOMS RESTROOMS
10 10
9 51'
336'
GENERAL NOTES:

1. AN AUTOMATIC SPRINKLER SYSTEM WILL BE

INSTALLED THROUGHOUT THE BUILDING PER
NFPA-13 STANDARDS.

2. WATER EFFICIENT PLUMBING FIXTURES AND

IRRIGATION SHALL BE IMPLEMENTED PER ACWD
MEASURES.
1 TILT UP SLAB CONSTRUCTION, TYP AT BUILDING

EXTERIOR
2 SLAB ON GRADE
3 LANDSCAPING, SEE LANDSCAPE PLAN
4 MEZZANINE ABOVE 10 STAIR OPEN TO OFFICE
11 ENCLOSED MEZZANINE LEVEL
7 OUTDOOR AMENITY, SEE SHEET CU-2.4
8 STAIR OPEN TO OFFICE
9 LINE OF CANOPY ABOVE
6 VEHICLE/FORK LIFT RAMP
5 TRANSFORMER LOCATION
12 EXTERIOR STAIR
SPECIFIC NOTES: DOCK DOOR

DRIVE IN DOOR

SITE LIGHTING FIXTURE
jacksonliles.com / 415.621.1799

NOTES LEGEND
1" = 40'-0"
FLOOR PLAN - MEZZANINE CU-2.2
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 40'-0" 1

FLOOR PLAN - MEZZANINE
RN
1 TYP
2 4 TYP
5 46' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 56' 58' 1000'
55'55'55'60' 60' 28' 27' 23'
363'
3 6
3 DOCK DOOR

DRIVE IN DOOR
GENERAL NOTES: SITE LIGHTING FIXTURE

1. AN AUTOMATIC SPRINKLER SYSTEM WILL BE

INSTALLED THROUGHOUT THE BUILDING PER
NFPA-13 STANDARDS.

2. WATER EFFICIENT PLUMBING FIXTURES AND

IRRIGATION SHALL BE IMPLEMENTED PER ACWD
MEASURES.
1 PARAPET
2 4-PLY BUILT UP ROOF SYSTEM
3 CANOPY BELOW
4 SKYLIGHTS
5 AREA OF MECHANICAL EQUIPMENT, PROVIDE ROOF
SCREEN
6 PRE-FINISHED METAL PANEL ENCLOSURE TO MATCH

BUILDING EXTERIOR
SPECIFIC NOTES:
jacksonliles.com / 415.621.1799

NOTES LEGEND
1" = 40'-0"
ROOF PLAN CU-2.3
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 40'-0" 1

ROOF PLAN
RN

INDUSTRIAL
OFFICE

W/ MEZZANINE

PARKING

MULTI-PURPOSE AREA
5 1
2 11
TYP 3
4 TYP 8 TYP 7 10
6 12
6 9
13 TYP
2' - 6"
1 PLANTS/LANDSCAPING
2 SEAT WALL, SEE CU-1.6 FOR COLOR & MATERIAL
3 SHADE TREES
4 EATING TABLES
5 CONCRETE PAVING WITH VARYING COLORS, SEE
CU-1.5 FOR COLOR & MATERIAL
6 AMENITY ENTRANCE GATE, SEE CU-1.6 FOR

COLOR & MATERIAL
10 CASUAL SEATING
11 OUTDOOR COOKING
7 PAINTED CEMENT BOARD OR SIMILAR FENCE, SEE CU-1.5

FOR COLOR & MATERIAL
8 PERFORATED METAL PANEL WITH STEEL FRAME, SEE
CU-1.6 FOR COLOR & MATERIAL
9 SIDEWALK
12 BUILDING ENTRY
13 SHORT TERM BICYCLE RACK, SEE CU-6.2 FOR DETAILS
jacksonliles.com / 415.621.1799
NOTES
1/8" = 1'-0"
ENLARGED PLAN - OUTDOOR CU-2.4
AMENITY 01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1/8" = 1'-0" 1

ENLARGED PLAN - OUTDOOR AMENITY
RN
1 PLANTS/LANDSCAPING
2 SEAT WALL, SEE CU-1.6 FOR COLOR & MATERIAL
3 SHADE TREES
4 EATING TABLES
5 CONCRETE PAVING WITH VARYING COLORS, SEE
CU-1.5 FOR COLOR & MATERIAL
6 AMENITY ENTRANCE GATE, SEE CU-1.6 FOR

COLOR & MATERIAL
10 CASUAL SEATING
11 OUTDOOR COOKING
7 PAINTED CEMENT BOARD OR SIMILAR FENCE, SEE CU-1.5

FOR COLOR & MATERIAL
8 PERFORATED METAL PANEL WITH STEEL FRAME, SEE
CU-1.6 FOR COLOR & MATERIAL
9 SIDEWALK
12 BUILDING ENTRY
13 SHORT TERM BICYCLE RACK, SEE CU-6.2 FOR DETAILS
6' - 0"
6 13 7 8 6 1' - 7"
8 7 2 2 6
3 6' - 0"
jacksonliles.com / 415.621.1799
NOTES
1/8" = 1'-0"
ENLARGED ELEVATIONS - CU-2.5
OUTDOOR AMENITY 01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1/8" = 1'-0" 1

ENLARGED ELEVATION
1/8" = 1'-0" 2

ENLARGED SECTION

COMPACT
14' 2'
16'
8' - 6"

ACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACCOMPACT

TYPICAL COMPACT STALL

TYPICAL STANDARD STALL
9'
19'
COMPACT STALL TO UTILIZE 2'

OVERHANG OVER LANDSCAPING
PER NMC SECTION 17.23.090(G)(2)
25'
LABEL EACH SPACE "COMPACT"
19'
17' 2'
9'

STANDARD STALL TO
UTILIZE 2' OVERHANG OVER

LANDSCAPING PER NMC
SECTION 17.23.090(G)(2)

TYPICAL STANDARD STALL
19'
3'
jacksonliles.com / 415.621.1799
1/8" = 1'-0"
ENLARGED PLAN - PARKING CU-2.6
STALLS 01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1/8" = 1'-0" 1

ENLARGED PLAN - PARKING
1/8" = 1'-0"
2 ENLARGED PLAN - PARKING
1 9
4 6
5 8
6 DN
DN
DN 3
3 7
OFFICE

W/ MEZZANINE

INDUSTRIAL
1 PLANTS/LANDSCAPING
2 SEAT WALL, SEE CU-1.6 FOR COLOR & MATERIAL
3 SIDEWALK
4 SLOPED WALKWAY, 1:20 MAX SLOPE
5 CONCRETE PAVING WITH VARYING COLORS, SEE
CU-1.5 FOR COLOR & MATERIAL
6 STAIR W/ HANDRAILS
7 SEAT WALL, SEE CU-1.6 FOR COLOR & MATERIAL
8 BUILDING ENTRY
9 SHORT TERM BICYCLE RACK, SEE CU-6.2 FOR DETAILS
jacksonliles.com / 415.621.1799
NOTES
1/8" = 1'-0"
ENLARGED PLAN - MAIN ENTRY CU-2.7
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
RN
1/8" = 1'-0" 1

ENLARGED PLAN - MAIN ENTRY
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"

TOP OF PARAPET
49' - 6"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"
TRUCK COURT EXISTING GRADE VARIES BETWEEN APPROX.
-3' - 6"
+19.0' TO +22.0', SEE CIVIL DRAWINGS
FINISHED GRADE AT +20.0'. SEE

CIVIL DRAWINGS
FINISHED GRADE AT +24.0', SEE CIVIL

DRAWINGS

CAST-IN-PLACE CONCRETE

STAIR AT ACCESS DOORS

WHERE SHOWN, TYP

TOP OF PARAPET
49' - 6"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"

PERFORATED METAL

PANEL SHADING

DEVICE, TYP

PREFINISHED ALUMINUM CURTAIN

WALL & GLAZING, TYP
EXISTING GRADE VARIES BETWEEN APPROX.
+19.0' TO +22.0', SEE CIVIL DRAWINGS
FINISHED GRADE AT +24.0'. SEE

CIVIL DRAWINGS

PREFINISHED

ALUMINUM WINDOW

FRAME & GLAZING, TYP

PREFINISHED ALUMINUM

STOREFRONT & GLAZING, TYP

TILT UP PANELS TO
BE PAINTED IN 3

DIFFERENT COLORS

AS SHOWN

PUBLIC ART INSTALLATION

TO BE DESIGNED
(PLACE HOLDER SHOWN)

PROLOGIS SIGNAGE PRE-FINISHED METAL CANOPY

ABOVE ENTRY, TYP

ACCESS DOOR, TYP SPANDREL GLAZING, TYP

EXTERIOR WALL MOUNTED
BUILDING LIGHT FIXTURE, TYP.

SEE SHEET CU-6.2 FOR DETAILS

TOP OF PARAPET
49' - 6"

MECHANICAL SCREEN

BEYOND, TYP
TO T.O. MECH SCREEN
49' - 6"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"

BUILDING SETBACK AT OUTDOOR AMENITY

CEMENT BOARD OR SIMILAR FENCE

AT OUTDOOR AMENITY

PERFORATED METAL GATE
PERFORATED METAL PANEL EXISTING GRADE VARIES BETWEEN APPROX. +19.0' TO +22.0', SEE CIVIL DRAWINGS
FINISHED GRADE AT +24.0'. SEE

CIVIL DRAWINGS

TOP OF PARAPET
49' - 6"
jacksonliles.com / 415.621.1799
As indicated
NORTH & WEST ELEVATIONS CU-3.1
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 40'-0" 1

NORTH ELEVATION
1" = 20'-0" 4

WEST ELEVATION
1" = 20'-0" 2

ENLARGED NORTH ELEVATION - EAST
1" = 20'-0" 3

ENLARGED NORTH ELEVATION - WEST

SEE ENLARGED ELEVATION EAST SEE ENLARGED ELEVATION WEST FOR TYPICAL NOTES, SEE 2/CU-3.1 -

ENLARGED NORTH ELEVATION
FOR TYPICAL NOTES, SEE 2/CU-3.1 -

ENLARGED NORTH ELEVATION
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"

TRUCK COURT
FINISHED GRADE AT +20.0', -3' - 6"

SEE CIVIL DRAWINGS

EXISTING GRADE VARIES BETWEEN
APPROX. +19.0 TO +22.0, SEE CIVIL

DRAWINGS
FINISHED GRADE AT +24.0',

SEE CIVIL DRAWINGS

CAST-IN-PLACE CONCRETE

STAIR AT ACCESS DOORS

WHERE SHOWN, TYP

TOP OF PARAPET
49' - 6"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"

TRUCK COURT
-3' - 6"

TOP OF PARAPET
49' - 6"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"

TRUCK COURT
-3' - 6"

EXISTING GRADE VARIES BETWEEN
APPROX. +19.0 TO +22.0, SEE CIVIL

DRAWINGS
FINISHED GRADE AT +20.0',

SEE CIVIL DRAWINGS

TOP OF PARAPET
49' - 6"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"

TRUCK COURT
-3' - 6"

ROLL UP DOCK DOOR,
TYP

RAMP UP TO ROLL UP DOOR MAN DOOR AND STAIR
AND MAN DOOR, TYP OF 2

EXISTING GRADE VARIES BETWEEN
APPROX. +19.0 TO +22.0, SEE CIVIL

DRAWINGS
FINISHED GRADE AT +20.0',

SEE CIVIL DRAWINGS

EXTERIOR WALL MOUNTED

BUILDING LIGHT FIXTURE, TYP

TOP OF PARAPET
49' - 6"
jacksonliles.com / 415.621.1799
As indicated
SOUTH & EAST ELEVATIONS CU-3.2
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 20'-0" 4

EAST ELEVATION
1" = 40'-0" 1

SOUTH ELEVATION
1" = 20'-0" 3

ENLARGED SOUTH ELEVATION - EAST
1" = 20'-0" 2

ENLARGED SOUTH ELEVATION - WEST

SEE ENLARGED ELEVATION WEST SEE ENLARGED ELEVATION EAST FOR TYPICAL NOTES, SEE 2/CU-3.1 -

ENLARGED NORTH ELEVATION
FOR TYPICAL NOTES, SEE 2/CU-3.1 -

ENLARGED NORTH ELEVATION
FOR TYPICAL NOTES, SEE 2/CU-3.1 -

ENLARGED NORTH ELEVATION
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

INDUSTRIAL
(OFFICE

BEYOND)
(OFFICE

BEYOND)

INDUSTRIAL

TRUCK COURT
-3' - 6"
LEVEL 1 CLR HT
40' - 6"

TOP OF PARAPET
49' - 6"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

INDUSTRIAL

TRUCK COURT

TRUCK COURT
-3' - 6"
LEVEL 1 CLR HT
40' - 6"
FINISHED GRADE AT +24.0',

SEE CIVIL DRAWINGS

EXISTING GRADE VARIES BETWEEN
APPROX. +19.0 TO +22.0, SEE CIVIL

DRAWINGS
FINISHED GRADE AT +24.0',

SEE CIVIL DRAWINGS

TOP OF PARAPET
49' - 6"

MECHANICAL SCREEN
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

INDUSTRIAL

TRUCK COURT
-3' - 6"
LEVEL 1 CLR HT
40' - 6"

EXISTING GRADE VARIES BETWEEN
APPROX. +19.0 TO +22.0, SEE CIVIL

DRAWINGS
FINISHED GRADE AT +24.0',

SEE CIVIL DRAWINGS

TOP OF PARAPET
49' - 6"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

INDUSTRIAL

TRUCK COURT
-3' - 6"
LEVEL 1 CLR HT
40' - 6"

EXISTING GRADE VARIES BETWEEN
APPROX. +19.0 TO +22.0, SEE CIVIL

DRAWINGS
FINISHED GRADE AT +24.0',

SEE CIVIL DRAWINGS

TOP OF PARAPET
49' - 6"
jacksonliles.com / 415.621.1799
As indicated
BUILDING SECTIONS CU-4.1
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1" = 40'-0" 1

LONG SECTION
1" = 20'-0" 4

TRANSVERSE SECTION
1" = 20'-0" 2

LONG SECTION - WEST
1" = 20'-0" 3

LONG SECTION - EAST

SEE ENLARGED ELEVATION EAST SEE ENLARGED ELEVATION WEST 13' - 7"
20' - 4"
5 1
2 3
4 TYP 6
7 9 8 8 9
10 TYP
11 18' - 0"
10' - 5"
1 6
6' - 0"
9' - 0"
10' - 0"
1 9' - 0"
10' - 0"
6' - 0"
6 1
9' - 0"
6' - 0"
6 TYP 4
TYP 6
5 6' - 0"
10' - 0"
1 TILT UP CONCRETE WALL WITH FORMLINER PATTERN TO

MATCH BUILDING
2 SLAB ON GRADE
3 DRAIN
4 PERFORATED METAL GATE TO MATCH MATERIAL ON

BUILDING
5 CORRUGATED METAL ROOF
6 TUBE STEEL ROOF STRUCTURE
10 OUTLINE OF 8 CUBIC YARD DUMPSTER - 72" X 91" X 72"
11 CONCRETE CURB
7 STRIPING TO INCLUDE "NO PARKING" TEXT
8 ADJACENT LANDSCAPING AND CONCRETE CURB
9 PARKING STALL
jacksonliles.com / 415.621.1799

NOTES LEGEND
1/4" = 1'-0"
TRASH ENCLOSURE DETAILS CU-6.1
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1/4" = 1'-0" 1

TRASH ENCLOSURE - ROOF PLAN
1/4" = 1'-0" 2

TRASH ENCLOSURE - PLAN
1/4" = 1'-0"
3 TRASH ENCLOSURE - NORTH ELEVATION
1/4" = 1'-0"
4 TRASH ENCLOSURE - SOUTH ELEVATION
1/4" = 1'-0"
6 TRASH ENCLOSURE - WEST ELEVATION
1/4" = 1'-0"
5 TRASH ENCLOSURE - EAST ELEVATION
3' - 7" 3' - 7" 12' - 8" 12' - 8" 6' - 4" 6' - 4" 5' CLR 5' CLR 2' - 8"
9' - 7"
49"
32" 76"
GRADE
0' - 0"
LEVEL 1
0' - 6"
ROOF
43' - 6"

MEZZANINE
17' - 6"

TOP OF PARAPET
49' - 6"

EXTERIOR WALL

MOUNTED BUILDING

LIGHT FIXTURE, TYP
24' - 0"
24' - 6"
6" CURB

BICYCLE RACK

SPACE ALLOCATED
FOR BICYCLE6'
2' 2' 2' 2' - 6"5' - 6" 2'

BICYCLE RACK

SPACE ALLOCATED

FOR BICYCLE
6' 2'2' - 6"
2'
jacksonliles.com / 415.621.1799
As indicated
SITE FIXTURE DETAILS CU-6.2
01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE
1/4" = 1'-0" 1

LONG TERM BICYCLE LOCKERS - ENLARGED PLAN
1" = 1'-0"
4 LONG TERM BICYCLE LOCKER - ELEVATIONS
1/4" = 1'-0"
6 LIGHTING FIXTURE - WALL MOUNTED - FRONT ELEVATION
1/4" = 1'-0"
5 LIGHTING FIXTURE - POST MOUNTED - SIDE ELEVATION EXTERIOR LIGHTING FIXTURE - BLACK

LONG TERM BICYCLE LOCKER - GRAY

SHORT TERM BICYCLE RACK - GRAY
1/4" = 1'-0" 2

SHORT TERM BICYCLE PARKING - MAIN ENTRY
1/4" = 1'-0" 3

SHORT TERM BICYCLE PARKING - OUTDOOR AMENITY
DN
Steering Angle
Lock to Lock Time
Articulating Angle
WB-67
Trailer Track
Tractor Track
Trailer Width
Tractor Width

19.494.00
Feet

8.50 : 8.50

8.01 8.01
:
:
:

0.00 2.99 45.50

14.99 52.98
:
:
: 6.0 s

28.4 deg

75.0 deg

CENTRAL AVEFUTURE CENTRAL AVE OVERPASS SYCAMORE ST

TRUCK COURT
(N) BUILDING

TRAILER STORAGE

PARKING

EXTENT OF FUTURE CENTRAL AVE OVERPASS
25 STALLS
20 STALLS
5'
78'
(E) ADJACENT BLDG(E) ADJACENT BLDG
(E) ADJACENT BLDG
(E) ADJACENT
BLDG
(E) ADJACENT BLDG
(E) ADJACENT BLDG
(E) ADJACENT
BLDG

LONG HAUL TRUCK ENTRY

LONG HAUL TRUCK EXITING
jacksonliles.com / 415.621.1799
1" = 60'-0"
APPENDIX 1 - LONG HAUL CU-A.1
TRUCK TURNING 01/27/25
6756 Central Ave
Newark, CA 94560
6756 CENTRAL AVE

DESIGN VEHICLE
LEGEND

ENVIRONMENTAL CHECKLIST FOR STREAMLINED REVIEW

PURSUANT TO CALIFORNIA PUBLIC RESOURCES CODE
SECTION 21083.3 AND CEQA GUIDELINES SECTION 15168 and 15183 6756-6792 CENTRAL AVENUE

INDUSTRIAL BUILDING DEVELOPMENT PROJECT
Prepared For:

City of Newark
37101 Newark Boulevard
Newark, CA 94560
Prepared By:

M-Group
51 E. Campbell Ave #1247
Campbell, CA 95009
June 2025
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page i
[Page Intentionally Left Blank]
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page ii
6756-6792 CENTRAL AVENUE INDUSTRIAL BUILDING DEVELOPMENT PROJECT

CEQA ENVIRONMENTAL CHECKLIST FOR STREAMLINED REVIEW
Project Title: 6756-6792 Central Avenue Industrial Building Development Project Lead Agency: City of Newark
37101 Newark Boulevard
Newark, CA 94560
Contact Person: Joseph Balatbat
Phone: (510) 578-4042
Email: [email protected]
Project Location: 6756-6792 Central Avenue, City of Newark, Alameda County, California APNs 092A-2165-014, -015, -016, and -017
Property Sponsor and
Owner(s):

Property Owner:

Prologis LP
Pier 1, Bay 1
San Francisco, CA 94111
(510) 661-4038
Project Applicant:

Ryan Marshall
Pier 1, Bay 1
San Francisco, CA 94111
(415) 733-9411
General Plan
Designation:

General Industrial
Zoning: General Industrial (GI)
Description of Project: The Project proposes the demolition of all existing buildings and site improvements on an approximately 17.4-acre site and the construction of an approximately 315,390 square-foot new industrial building. The new industrial building includes approximately 33,806 square feet of office space and 281,584 square feet of industrial space. Associated improvements include drive aisles for circulation and two 40-foot-wide driveways providing access to the site from Central Avenue. The Project would provide 396 on-site parking spaces, which include 291 standard spaces, 10 accessible spaces, and 95 compact spaces. In addition, 46 loading spaces with dock doors and 2 loading spaces with drive-in doors are proposed. The Project would also include 14 long-term bike lockers and 20 short-term bike parking spaces. Ancillary improvements include landscaping, fencing, and lighting.

Surrounding land uses
and setting; briefly
describe the project’s
surroundings:

The most recent General Plan, adopted in 2013, designates the areas surrounding the Project site for General Industrial use. The Project site is bordered by a Union Pacific right-of-way to the south, manufacturing and industrial use facilities to the east and west (beyond Central Avenue), and a commercial laundry facility (Mission Linen Supply) to the north. Central Avenue is located along the Project Site’s frontage, providing direct access to the site.

The Project is located approximately 1.43 miles southwest of the interchange of I-880 and Mowry Avenue, allowing access to and from I-880; Mowry Avenue crosses I-880 with an overpass.

Other public agencies
whose approval is
required (e.g. permits,
financial, or
participation
agreements):

San Francisco Regional Water Quality Control Board (SFRWQCB) Alameda County Water District (ACWD)
Alameda County Flood Control and Water Conservation District (ACFCWCD) Union Sanitary District (USD)
UPR (Union Pacific Railroad)
PG&E (Pacific, Gas, & Electric)
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page iii
Have California Native
American tribes
requested consultation
pursuant to Public
Resources Code
section 21080.3.1?
Public Resources Code Section 21080.3.1 requires lead agencies to provide notice to tribes that are traditionally and culturally affiliated with the geographic area of a proposed project if they have requested notice of projects proposed within that area. No tribes have requested notice of projects proposed in the city of Newark.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page iv
6756-6792 CENTRAL AVENUE INDUSTRIAL BUILDING DEVELOPMENT PROJECT

TABLE OF CONTENTS PAGE

1. INTRODUCTION.........................................................................................................................................1

2. PROJECT SUMMARY................................................................................................................................1

2.1. GENERAL PLAN AND ZONING ...........................................................................................................1

2.2. VICINITY SETTING...............................................................................................................................1

2.3. PROJECT SITE SETTING ....................................................................................................................2

2.4. PROJECT DESCRIPTION ....................................................................................................................2

2.5. CONSTRUCTION..................................................................................................................................4

2.6. PUBLIC OUTREACH.............................................................................................................................5

2.7. ENTITLEMENTS ...................................................................................................................................5

3. APPLICABLE CEQA PROVISIONS AND FINDINGS .............................................................................13

3.1. GENERAL PLAN EIR (2013 FEIR) .....................................................................................................13

3.2. CONSISTENCY WITH PROGRAM EIR (CEQA GUIDELINES SECTION 15168).............................13

3.3. APPLICABILITY OF THE PROJECT TO 15168 .................................................................................13

3.4. GENERAL PLAN/COMMUNITY PLAN EXEMPTION (CEQA GUIDELINES SECTION 15183) ........13

3.5. APPLICABILITY OF THE PROJECT TO 15183 .................................................................................14

3.6. CEQA DETERMINATION AND SUMMARY OF FINDINGS ...............................................................15

3.7. ENVIRONMENTAL CONDITIONS OF APPROVAL ...........................................................................16

4. EVALUATION OF ENVIRONMENTAL EFFECTS...................................................................................17

4.1. AESTHETICS ......................................................................................................................................18

4.2. AGRICULTURAL AND FORESTRY RESOURCES............................................................................20

4.3. AIR QUALITY ......................................................................................................................................21

4.4. BIOLOGICAL RESOURCES...............................................................................................................29

4.5. CULTURAL RESOURCES..................................................................................................................33

4.6. ENERGY..............................................................................................................................................35

4.7. GEOLOGY AND SOILS.......................................................................................................................36

4.8. GREENHOUSE GAS EMISSIONS .....................................................................................................40

4.9. HAZARDS AND HAZARDOUS MATERIALS......................................................................................42

4.10. HYDROLOGY AND WATER QUALITY...............................................................................................47

4.11. LAND USE AND PLANNING...............................................................................................................51

4.12. MINERAL RESOURCES.....................................................................................................................53

4.13. NOISE..................................................................................................................................................53

4.14. POPULATION AND HOUSING ...........................................................................................................58

4.15. PUBLIC SERVICES.............................................................................................................................60

4.16. RECREATION .....................................................................................................................................62

4.17. TRANSPORTATION............................................................................................................................64

4.18. TRIBAL CULTURAL RESOURCES ....................................................................................................69

4.19. UTILITIES AND SERVICE SYSTEMS ................................................................................................70

4.20. WILDFIRE............................................................................................................................................74

4.21. MANDATORY FINDINGS OF SIGNIFICANCE...................................................................................75

5. REFERENCE DOCUMENTS....................................................................................................................77

5.1. TECHNICAL APPENDICES................................................................................................................77

5.2. OTHER DOCUMENTS REFERENCED ..............................................................................................77

6. ENVIRONMENTAL CONDITIONS OF APPROVAL ................................................................................78 City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page v

TABLE OF FIGURES
FIGURE 1: REGIONAL LOCATION ............................................................................................................................7 FIGURE 2: PROJECT SITE AND VICINITY..................................................................................................................8 FIGURE 3: LAND USE.............................................................................................................................................9 FIGURE 4: ZONING ..............................................................................................................................................10 FIGURE 5: SITE PLAN ..........................................................................................................................................11

APPENDICES
A. Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the 6756 Central Avenue, July 19, 2024, prepared by FirstCarbon Solutions.

B. Geotechnical Investigation, Central Avenue Logistics Center, October 13, 2022, prepared by Cornerstone Earth Group.

C-1. Phase I Environmental Site Assessment Report, April 30, 2024, prepared by Farallon Consulting.

C-2. Data Gap Investigation and Request for Site Closure, September 13, 2023, prepared by Farallon Consulting.

D-1. Acoustical Assessment, 6750 Central Avenue Project, City of Newark, California, December 2023, prepared by Kimley Horn.

D-2. General Plan Noise Policy Consistency Analysis, March 2023, prepared by Kimley Horn.

E. Transportation Impact Study, prepared by Kimley Horn, dated May 2025.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 1

1. INTRODUCTION
This California Environmental Quality Act (CEQA) Analysis evaluates environmental impacts from the proposed 6756-6792 Central Avenue Development Project. The Project consists of the demolition of all existing improvements on the approximately 17.4-acre site to facilitate the construction and operation of a new 315,390- sf. industrial building and associated improvements (hereinafter referred to as the “Project”). Documentation herein has been prepared by the City of Newark as the lead agency as defined in Section 15367 of the CEQA Guidelines and in full accordance with the procedural and substantive requirements of CEQA Guidelines. This CEQA Analysis uses streamlining and tiering in accordance with CEQA Guidelines Sections 15183 and 15168 for consistency with the General Plan and the certified Environmental Impact Report (EIR).

2. PROJECT SUMMARY
The Project site is located at 6756-6792 Central Avenue (Assessor Parcel Numbers 092A-2165-014, -015, - 016, and -017) northeast of the Union Pacific right-of-way intersection with Central Avenue, in the City of Newark, Alameda County, California. The Project proposes the demolition of all existing improvements on the approximately 17.4-acre site and the construction of an approximately 315,390 square feet industrial building comprised of 281,584 gross square feet in industrial area and 33,806 square feet in office. Construction will be tilt-up concrete with metal panel accents providing for both solar shading and architectural detail. The overall exterior height of the proposed structure would be 49’-6”, to the top of the parapet.

The interior of the building would comprise the industrial space, 281,180 square feet in area and 40’-0” in clear height. The office area would comprise of approximately 16,630 square feet of interior space on the first floor and 16,630 square feet in the mezzanine office area above. The new industrial development would include outdoor amenity space for use by tenants at the west side of the building. Proposed associated improvements include internal drive aisles for circulation, onsite parking for employees, 46 loading truck dock doors and two drive-in doors located at the east side of the site, and two 40-foot-wide driveways providing access to the site from Central Avenue.

2.1. GENERAL PLAN AND ZONING
The City’s current General Plan, adopted in 2013, designated the parcels surrounding the Project site as General Industrial (Figure 3: Land Use). The site has a Zoning Designation of General Industrial (GI) (Figure 4: Zoning). The General Industrial land use is intended to provide a wide range of manufacturing, warehousing, wholesaling, and distribution uses with a floor area ratio (FAR) between 0.2 and 2.5; site specific factors like height limits, parking and landscaping requirements, proximity to residential areas, and site size and dimensions can alter the allowed FAR.

2.2. VICINITY SETTING
The Project site is located in the central part of Newark in an industrial area of the city, adjacent to Central Avenue, and is surrounded by industrial land uses with manufacturing facilities to the east and west (across Central Avenue), a commercial laundry facility to the north, and the Union Pacific right-of-way to the south and east. The nearest residential use is over 650 feet northwest of the project site, near the intersection of Central Ave. and Cherry Street. Other nearby facilities include an existing logistics and distribution center across the Union Pacific tracks and storage yards to the southeast and northwest. The Cargill Salt Harvesting and processing facility is approximately 1,500 feet to the south-southwest of the Project site. The Project site is approximately 1.5 miles northwest of the developing Southwest Newark Residential and Recreational Focus Area.

The Project site is located 2.34 miles from State Route 84 (SR-84), which borders the city of Newark to the northwest, approximately 1.2 miles from Interstate 880 (I-880) that defines Newark’s northeastern edge, and approximately 1.4 miles southwest of the I-880 and Mowry Avenue interchange. The interchange of I-880 and Mowry Avenue allows access to and from I-880; Mowry Avenue crosses I-880 with an overpass. Two bus stops located at the intersection of Central Avenue and Sycamore Street serve the Alameda-Contra Costa Transit District’s 200 and 620 lines. Figure 2: Project Site and Vicinity shows the Project site location and its vicinity.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 2

2.3. PROJECT SITE SETTING
The 17.4-acre Project site consists of four parcels and contains multiple easements. Parcels 092A-2165-015, -016, and -017 are vacant open spaces. Parcel number 092A-2165-014 is currently developed with a 27-foot tall single-story, 39,539 square foot, rectangular, concrete warehouse. Uncovered storage yards are located east of the warehouse and along the northwestern property line. The existing structure has no windows or pedestrian access points along the Central Avenue property line other than a vehicle access point on the northwest side of the building. The Project proposes to demolish all existing structures and hardscapes on site.

No parcel to be redeveloped contains any historic resources listed on a municipal, state, or federal registry.

The Project site is enclosed by a six-foot (6’) tall, metal chain-link barbed wire fence with portions along Central Avenue covered with tarp or plastic slats. The site was used as a materials storage yard, containing metal beams, pallets, trucks, concrete road barriers, wood, and metal scaffolding. However, the site has been cleared of these materials and existing surfaces on the Project site include unpaved ground, dirt roads, asphalt, concrete, and concrete pads. Currently, the site contains 695,179 square feet of impervious surface and 60,882 square feet of pervious surface.

Ten mature non-deciduous trees occupy the grass space between the existing concrete building and Central Avenue. The southwest portion of the Project site is mostly barren land with little vegetation. The northeast portion of the lot contains patches of dirt and grass with a few shrubs and a parking lot at the north side of the building.

The site is accessed via three existing, two-way driveways along Central Avenue on the western side of the building. The first driveway is located near the northernmost corner of the site, the second is south of the first driveway, separated by a distance of 139 feet. The third driveway is located approximately 40 feet southwest of the second driveway, near the intersection of Central Avenue and Sycamore Street, and is gated. An existing utility pole is located on site adjacent to this gated driveway.

At the Project Site frontage, Central Avenue extends at grade and provides two vehicle travel lanes in each direction. There are no existing sidewalks along Central Avenue proximate to the project site. The City of Newark is in the process of developing plans to construct an overpass along Central Avenue above the Union Pacific Railroad and in front of the Project site. The overpass would extend across approximately 75% of the Project’s frontage.

2.4. PROJECT DESCRIPTION
The 6756-6792 Central Avenue Prologis Industrial Development Project proposes demolition of all existing buildings and hardscapes on the Project site and construction of an approximately 315,390 square-foot industrial building. The proposed building 49’-6” in height to the top of the parapet, with approximately 33,806 square feet of office space in the building. As described above, the interiors of the building would comprise the industrial space, 281,180 square feet in area and 40’-0” in clear height. The additional office area would comprise of 16,630 square feet of interior space on the first floor and 16,630 square feet above comprising the mezzanine.

Although there are no prospective tenants at the time of this environmental analysis, the Project would prohibit Cold Storage Use and Transport Refrigeration Units by including:
• Contractual language in all tenant lease agreements that will prohibit tenants from operating Transport Refrigeration Units (TRUs) within the project site;
• A restrictive covenant over the parcel that prohibits the applicant’s use of TRUs on the property unless the applicant seeks and receives an amendment to its conditional use permit allowing such use, and • A requirement that prior to granting approval of future application request(s) for cold storage and associated TRU usage, the applicant will provide a Health Risk Assessment of air toxic contaminants City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 3
emitted from operation demonstrating that TRUs would not result in a significant health impact as defined by BAAQMD threshold.1
As shown in Figure 5: Site Plan, the proposed industrial building is situated on the site facing Central Avenue (to the west of the site) with 46 truck dock doors and two drive-in doors proposed on the eastern portion of the site. The Project proposes both chain-link and steel tube fencing on the northern, eastern, and southern property lines. There is no fencing proposed along Central Avenue.

Access and Parking
Access to the site would be provided via two, 40-foot-wide, two-way driveways from Central Avenue. The Project would include 396 standard, accessible, and compact automobile parking spaces along the western portion of the site, with some spaces along the southern, northern, and eastern perimeters. Fourteen (14) longterm bike lockers and 20 short-term bicycle spaces are also proposed.

Building Design
The facility will be predominately a single-story, tilt-up concrete building with metal panel accents providing for both solar shading and architectural detail. Additional design features have been provided along the Central Avenue façade. A pre-finished metal canopy and perforated metal panels are proposed at the facility’s entrance. The facility’s exterior design includes a monochromatic palate of painted concrete, clerestory windows, and perforated metal window accent panels. The outdoor employee space at the west side of the building façade, facing Central Avenue, includes a location for a public art installation within the cement board fence and perforated metal gate. The space will also contain concrete seating/retaining walls, tables, seating, shading trees, planters, and an outdoor cooking space.

Landscaping and Site Amenities
The Project would provide 78,600 square feet of landscaped area and trees along the perimeter of the site.

Additional trees and a landscaped area of 28,609 square feet are proposed within parking areas. A variety of low to medium flowering shrubs and screening plants are also proposed along the Project’s property line. Bioretention planter areas would be provided on the western portion and eastern portion of the site. The proposed pervious and impervious surface area onsite would be the same as the existing conditions with 695,179 sf. of impervious surface and 60,882 sf. of pervious surface.

A ten-foot-tall trash enclosure would be provided in the southern portion of the site. Post-mounted lighting fixtures are proposed throughout the perimeter of the Project site and wall-mounted lighting is proposed along the exterior of the proposed structure.

Easements and Utilities
The Project includes the removal of all internal lot lines onsite to allow for the merger of four lots to one lot.

The site contains multiple easements, of which a 10-foot-wide sewer and water easement on the southern edge of the site, a 4-foot-wide roadway and public utility easement along the Central Avenue frontage would remain. Additionally, the Project includes the establishment of new easements along the Central Avenue frontage, including but not limited to:
• A 10-foot-wide sidewalk and maintenance easement.
• Three temporary construction easements – 10 feet, 25 feet and 25.5 feet wide, respectively. • Three 10-foot-wide Alameda County Water District (ACWD) water lateral easement. • A 17-foot wide ACWD water lateral easement, and
• A 30-foot wide ACWD waterline easement.

The Project proposes a 24” storm drain connecting the bioretention area in the southern corner of the Project site, along the southwestern property line, to the existing Central Avenue municipal storm drain. An additional 1 Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis, prepared by FirstCarbon Solutions, July 19, 2024.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 4
18” storm drain is proposed to connect the northwestern parking lot bioretention area to the Central Avenue storm drain. The Project will be served by one 6” sewer connection to Central Avenue. Two new municipal water line connections and three new water laterals are proposed along the northwestern property line along Central Avenue.

Off-Site Improvements
The Project’s offsite improvements include extensions of lateral connections for utilities such as water, sewer, stormwater, and a joint trench. Additionally, four existing driveway curb cuts will be removed and curb cuts for two new driveways will be constructed.

2.5. CONSTRUCTION
For the purposes of this analysis, it is assumed that construction of the Project would begin in the second quarter of 2025 and would take approximately one and a half years to complete. Construction would include demolition, site preparation & grading, utility & building construction, paving, and landscaping/architectural finishes. Construction vehicles would access the site via Central Avenue with construction traffic routed to and from I-880 via Mowry Avenue and Cherry Street to Central Avenue. On-site construction staging areas will be determined at the time of construction.

Demolition
This construction phase would include demolition and removal of the existing building and structures, pavement and hardscape improvements, utilities, and transformer in the electrical maintenance room inside the existing main building. Demolition material would be transported offsite to the Fremont Recycling and Transfer facility on Boyce Road in Fremont. Demolition equipment would include excavators, loaders, bobcats, aerial man lifts, tow behind generator, water trucks, and concrete crusher.

Site Preparation and Grading
Site preparation and grading would follow demolition activity to allow for construction of the proposed industrial structure, utility connections, and landscaping. Grading onsite would result in 32,692 cubic yards of cut and 35,203 cubic yards of fill. As such, the site preparation activities would result in 2,511 cubic yards of material to be hauled off the site. Construction equipment required to accomplish this phase of the construction would include excavators, scrapers, bulldozer, skip loader, compactor, and water truck. Site preparation and grading activities are anticipated to take approximately six weeks to complete.

Utility and Building Construction
This phase would involve installation of connections to existing utility lines in Central Avenue and building construction. Construction equipment required for this phase includes backhoes, compactors, forklift, welders, cranes, generators, paving equipment and rollers. This phase is anticipated to be completed in approximately six months.

Architectural Finishes and Landscaping
This phase would conclude Project construction and would require the use of backhoes, trucks, and air compressors. This phase is anticipated to be completed in approximately three months.

Offsite Improvements
Offsite improvements as specified above are anticipated to take approximately two months.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 5

2.6. PUBLIC OUTREACH
The applicant provided notice of a community meeting, held on December 18, 2023, ten days in advance via mail to property owners within a 1,000-foot radius of the Project site. The meeting was conducted at the Silliman Activity Center on Mowry Avenue. No members of the public attended the meeting.

A second community meeting was held at the City Hall Library on January 21, 2025. The applicant provided notice of a community meeting, ten days in advance via mail to property owners within a 1,000-foot radius of the Project site. The project applicant team, City staff, and one member of the public attended the meeting.

The project applicant team presented an overview of the project.

2.7. ENTITLEMENTS
The Project applicant has requested the following entitlements:

1. Design Review of the proposed buildings and site improvements

2. Conditional Use Permit for indoor warehousing & storage use and wholesaling & distribution use

3. Minor Use Permit for additional fence height
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 6
[Page Intentionally Left Blank]
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 7
Figure 1: Regional Location
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 8
Figure 2: Project Site and Vicinity
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 9
Figure 3: Land Use
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 10
Figure 4: Zoning
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 11
Figure 5: Site Plan
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 12
[Page Intentionally Left Blank]
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 13

3. APPLICABLE CEQA PROVISIONS AND FINDINGS
The following discussion presents the relevant provisions of CEQA to which the proposed 6756-6792 Central Avenue Industrial Building Development Project complies. It provides an overview of the Community Plan Exemption, determination of consistency with the City’s program level Environmental Impact Report (EIR) for the General Plan (referred to as “General Plan Tune Up” in the 2013 FEIR) and the Final Environmental Impact Report (FEIR), 2013. A description of how the Project complies with each provision is presented below. Finally, this section concludes with the CEQA findings and determination that the project is exempt from further environmental review.

3.1. GENERAL PLAN EIR (2013 FEIR)
The City of Newark General Plan that was adopted in 2013 serves as the document that guides future development citywide and expresses the community’s development goals and public policies related to land uses. The General Plan EIR (2013 FEIR) assesses potentially significant environmental impacts associated with implementation of the General Plan. The 2013 FEIR was prepared to provide the public, responsible agencies, and decision makers with information about the probable environmental effects of adoption and implementation of the General Plan. The 2013 FEIR serves as a programmatic document that is intended to be used to evaluate subsequent projects and activities within the planning area. The findings of the 2013 FEIR are presented below in Section 4 for each environmental category.

3.2. CONSISTENCY WITH PROGRAM EIR (CEQA GUIDELINES SECTION 15168) The City of Newark certified the 2013 FEIR, a program level EIR, which includes an analysis of the development potential of the 6756-6792 Central Avenue site. The 2013 FEIR provides streamlining and/or tiering opportunities under CEQA Guidelines Section 15168. CEQA Guidelines Section 15168(c) states that “later activities in the program must be examined in the light of the program EIR to determine whether an additional environmental document must be prepared.”

3.3. APPLICABILITY OF THE PROJECT TO 15168
The proposed 6756-6792 Central Avenue Industrial Building Project is a “later activity” of the program EIR.

Section 4 of this CEQA Analysis provides an assessment of the Project’s environmental impacts relative to what was analyzed in the 2013 FEIR. As described in Section 4, the Project does not result in environmental effects that were not previously examined. As such, pursuant to CEQA Guidelines Section 15162 and 15163, no subsequent or supplemental EIR is required. In accordance with CEQA Guidelines Section 15168(c)(2), the City can “approve the activity as being within the scope of the project covered by the program EIR, and no new environmental document would be required.”
CEQA Guidelines Section 15168(c)(3) states that “an agency shall incorporate all feasible mitigation measures and alternatives developed in the program EIR into later activities in the program.” Section 6 of this CEQA analysis identifies the relevant environmental conditions of approval that will be required of the proposed Project to demonstrate compliance with mitigation measures set forth in the program level EIR, and policies, programs, and goals of the City of Newark General Plan.

As described below in Section 4, for each environmental resource topic in the Environmental Checklist, with implementation of mitigation measures, the Project would not result in significant impacts beyond those analyzed in the 2013 FEIR. In addition, the Project is subject to the payment of Development Impact Fees, which are collected to offset incremental increases in demand for public services and infrastructure from implementation of the General Plan.

3.4. GENERAL PLAN/COMMUNITY PLAN EXEMPTION (CEQA GUIDELINES SECTION 15183) California Public Resources Code Section 21083.3 and CEQA Guidelines Section 15183 allow a streamlined environmental review process for projects that are consistent with the densities established by existing zoning, community plan, or general plan policies for which an EIR was certified.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 14
Section 15183 (a) “mandates that projects which are consistent with the development density established by existing zoning, community plan, or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary to examine whether there are project-specific significant effects which are peculiar to the project or its site. This streamlines the review of such projects and reduces the need to prepare repetitive environmental studies.” Section 15183(b) specifies that “in approving a project meeting the requirements of Section 15183, a public agency shall limit its examination of environmental effects to those which the agency determines, in an initial study or other analysis:
1) Are peculiar to the project or the parcel on which the project would be located; 2) Were not analyzed as significant effects in a prior EIR on the zoning action, general plan, or community plan, with which the project is consistent;
3) Are potentially significant off-site impacts and cumulative impacts which were not discussed in the prior EIR prepared for the general plan, community plan or zoning action; or 4) Are previously identified significant effects which, as a result of substantial new information which was not known at the time the EIR was certified, are determined to have a more severe adverse impact than discussed in the prior EIR.”
Section 15183(c) specifies that if an impact is not peculiar to the parcel or to the project, has been addressed as a significant effect in the prior EIR, or can be substantially mitigated by the imposition of uniformly applied development policies or standards, then an additional EIR need not be prepared for the project solely on the basis of that impact.

Section 15183(d) further states that the streamlining provisions of this section “shall apply only to projects that meet the following conditions:
(1) the project is consistent with a community plan adopted as part of a general plan, a zoning action which zoned or designated the parcel on which the project would be located to accommodate a particular density of development, or a general plan of a local agency; and (2) an EIR was certified by the lead agency for the zoning action, the community plan, or the general plan.”

3.5. APPLICABILITY OF THE PROJECT TO 15183
The proposed 6756-6792 Central Avenue Industrial Building Development Project is consistent with the General Plan land use designation and zoning for the site, as outlined below, and meets the streamlining provisions under CEQA Guidelines Section 15183(d)(1):
(d)(1)(A) The project is consistent with a community plan adopted as part of a general plan.

The City of Newark General Plan was approved, and the EIR (SCH Number 2013012052) was certified on November 12, 2013, by City Council Resolution Number 10,415. The Project is located in the western part of Newark on a site that carries a General Industrial land use designation and is zoned General Industrial (GI).

The General Industrial land use designation allows for designation allows for a range of manufacturing, warehousing, wholesaling, and distribution uses with a floor area ratio of 0.2 to 2.5.

Consistent with the intent of the General Industrial land use designation, the Project proposes construction of an approximately 315,390 square foot industrial building with approximately 33,806 square feet of office space upon demolition of all existing buildings, pavement, and improvements on the Project site. The Project site does not conflict with existing residential or commercial uses and is consistent with the 2013 Newark General Plan.
(d)(1)(B) The project is consistent with a zoning action which zoned or designated the parcel on which the project would be located to accommodate a particular density of development.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 15
The Project is subject to and consistent with the General Industrial development standards and zoning requirements within the General Plan and the City of Newark Zoning Code (Title 17 of the Newark Municipal Code). The Project meets applicable policies and actions of the General Plan and the applicable development standards within the Zoning Code.
(d)(1)(C) The project is consistent with the City of Newark General Plan.

As described above, the Project is proposed and would be developed consistent with the density and intent of the General Industrial designation of the City’s General Plan. The proposed Project is consistent with applicable General Plan policies, including, but not limited to:
• Policy ED-1.5 Managing Land Resources. Ensure the wise use of Newark’s available industrial and commercial land supply. The City will plan strategically to ensure that the economic development potential of its commercial and industrial areas is fully realized. Vacant sites in such areas should be viewed as essential assets that can be used to strengthen and diversify Newark’s economy. Land uses such as group assembly, which are potentially incompatible with industrial operations and retail vitality, should be discouraged in the city’s major employment centers. • Policy ED-3.4 Affordable Industrial Space. Continue to support and foster the growth of general industrial uses, such as warehouse and distribution centers and manufacturing, in the Cherry Street and Central Avenue corridors and other areas designated for “General Industrial” uses on the Land Use Diagram • Policy ED-3.7 Industrial Redevelopment. Encourage property owners to redevelop industrial sites and buildings when the proposed redevelopment will generate high-quality and high-paying jobs. Likewise, support the refurbishing of such spaces for continued use as general industrial properties. • Policy ED-3.11 Vacant Building Reuse. Strive for an economically healthy industrial and office vacancy rate, and seek creative solutions to reduce the number of long-term vacant industrial and office buildings in the city. The reuse of such buildings with higher value employment-generating land uses is encouraged, provided such reuse does not adversely affect the ability of surrounding properties to continue their operations.
• Policy T-6.7 Truck Routes. Maintain a network of truck routes in Newark to ensure that truck traffic is directed away from residential areas and other sensitive uses, and to avoid congestion at major intersections. Truck traffic should be managed in a way that minimizes the distance that must be traveled between industrial areas and freeway interchanges while keeping commercial vehicles off of local streets and avoiding the potential for trucks to divert off of I-880 and SR 84 to "cut-through" Newark. • Policy T-6.8 Land Use and Truck Traffic. To the extent feasible, locate warehouse and distribution centers, heavier industrial facilities, and similar activities that generate large volumes of truck traffic in areas where ingress and egress can be accommodated without impacting residential areas and freeway access can be provided without using streets with predominantly residential traffic. • Policy T-6.9 Service and Loading Areas. Strategically locate and screen truck loading areas so as not to impact the attractiveness and safety of the street system. In general, loading areas should be located to the side or rear of buildings, away from pedestrian areas.

3.6. CEQA DETERMINATION AND SUMMARY OF FINDINGS
As summarized above and presented herein, the proposed 6756-6792 Central Avenue Industrial Building Development Project is eligible for the following CEQA exemptions:

Consistency with Program EIR. The City of Newark 2013 FEIR provides for streamlining and/or tiering provisions under CEQA Guidelines Section 15168. This CEQA Analysis demonstrates that the Project would City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 16
not result in substantial changes or involve new information that would warrant preparation of a subsequent EIR because the level of development proposed is within the development assumptions analyzed in the program level EIR (2013 FEIR). No further environmental review is required.

Community Plan Exemption. Streamlined environmental review per Section 15183 of the CEQA Guidelines and California Public Resources Code Section 21083.3. The Project is consistent with the General Plan and will not result in significant environmental impacts that were not previously identified as significant project-level, cumulative or offsite effects in the 2013 FEIR. The Project is exempt from further CEQA review since it is consistent with the General Plan.

Findings Summary
As described herein, the proposed 6756-6792 Central Avenue Industrial Building Development Project is within the scope of development projected under the General Plan for which an EIR was certified in 2013. The proposed Project will implement applicable mitigation measures identified in the 2013 FEIR. In addition, the Project would be required to comply with applicable conditions of approval and subject to uniformly applied development standards. With implementation of required mitigation measures and conditions of approval, the Project would not result in a substantial increase in the severity or significant impacts that were previously identified in the program level EIR, nor would the Project introduce any new significant impacts that were not previously identified. Therefore, there would be no additional environmental impacts beyond those analyzed in the 2013 FEIR.

Each of the above findings provides for a separate and independent basis for CEQA compliance. We do hereby certify that the above determination has been made pursuant to State and Local requirements.

3.7. ENVIRONMENTAL CONDITIONS OF APPROVAL
The Project shall incorporate all feasible mitigation measures set forth in findings of fact for prior applicable Environmental Impact Reports (EIR). The following EIRs have been determined by the City to be applicable to the Project:
• City of Newark General Plan EIR (SCH Number 2013012052) In each impact section of the Evaluation of Environmental Impacts, applicable mitigation measures from the findings of fact for the certified EIR are identified. Section 6 of this CEQA Analysis identifies relevant conditions of approval for the Project derived from mitigation measures, policies, and implementing programs established in the City’s General Plan and the certified 2013 FEIR.

Conditions of approval have been identified throughout the following analysis to ensure implementation of applicable mitigation measures and policies set forth in the General Plan and its EIR. The 6756-6792 Central Avenue Industrial Building Development Project applicant has reviewed, accepted, and shall implement all conditions of approval as part of the Project.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 17

4. EVALUATION OF ENVIRONMENTAL EFFECTS
This section examines the Project’s potential environmental effects within the parameters outlined in CEQA Guidelines Section 15183(b). The “Prior EIRs” (as defined in CEQA Guidelines Section 15183(b)(3)) is the City of Newark General Plan EIR (2013 FEIR), inclusive of all impact determinations, significance thresholds and mitigation measures identified therein.

Th evaluation builds from the Appendix G Environmental Checklist and has been modified to reflect the parameters outlined in CEQA Guidelines Section 15183(b). The checkboxes in the evaluation below indicate whether the proposed Project would result in environmental impacts, as follows:
• New Significant Impact relative to GP EIR– The proposed Project would result in a new significant impact that was not previously identified in the 2013 FEIR. • Substantial Increase in Severity of Previously Identified Significant Impact in GP EIR – The proposed Project’s specific impact would be substantially greater than the specific impact described in the 2013 FEIR.
• Substantial Change Relative to GP EIR – The proposed Project would involve a substantial change from analysis conducted in the 2013 FEIR.
• Equal or Less Severity of Impact than Previously Identified in GP EIR – The severity of the specific impact of the proposed Project would be the same as or less than the severity of the specific impact described in the 2013 FEIR.

Where the severity of the impacts of the proposed Project would be the substantially the same as or less than the severity of the impacts described in the 2013 FEIR, the checkbox for Equal or Less Severity of Impact Previously Identified in FEIR is checked. Where the checkbox for Substantial Increase in Severity of Previously Identified Significant Impact in FEIR or New Significant Impact is checked, there are significant impacts that are:
• Peculiar to project or project site (CEQA Guidelines Section 15183[b][3]); • Not analyzed as significant impacts in the previous EIRs, including off-site and cumulative impacts (CEQA Guidelines Section 15183[b][2]);
• Due to substantial changes in the project (CEQA Guidelines Section 15162[a][1]); • Due to substantial changes in circumstances under which the project will be undertaken (CEQA Guidelines Section 15162[a][2]); or
• Due to substantial new information not known at the time the EIRs were certified (CEQA Guidelines Sections 15162[a][3] and 15183[b][4]).

As described herein, the proposed Project will be required to comply with all applicable mitigation measures identified in the 2013 FEIR.

This evaluation hereby incorporates by reference the 2013 FEIR discussion and analysis of all environmental topics. The 2013 FEIR significance thresholds have been consolidated and abbreviated in this Checklist; a complete list of the significance thresholds can be found in the 2013 FEIR.

The 2013 FEIR is a program level document that considers the combined effects of implementing several related projects. As such, the analyses presented in the 2013 FEIR represent a cumulative analysis of environmental impacts that may occur from buildout of the General Plan.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 18

4.1. AESTHETICS
Except as provided in Public Resources Code Section
21099, would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including,
but not limited to, trees, rock outcroppings, and
historic buildings within a state scenic highway?
c) In non-urbanized areas, substantially degrade the
existing visual character or quality of public views of the site and its surroundings? (Public views are those
that are experienced from publicly accessible vantage
point). If the project is in an urbanized area, would the project conflict with applicable zoning and other
regulations governing scenic quality?
d) Create a new source of substantial light or glare
which would adversely affect day or nighttime views in
the area?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to aesthetics in Chapter 4.1 in the Plan Area incorporating the City of Newark and determined the following:
• Impact AES-1: The proposed Plan would not have a substantial adverse effect on a scenic vista and the impact of the proposed Plan on scenic vistas subject to the City of Newark Municipal Code (NMC), Chapter 17.16.220 Design Guidelines and implementation of General Plan Policies LU-4.13, LU-4.14 and POS-1.6. This impact is considered to be less than significant. • Impact AES-2: The proposed Plan would not substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings, within a State scenic highway and the proposed Plan would have no impact on these resources.
• Impact AES-3: The proposed Plan would result in a significant impact to the visual character of the Southwest Newark Residential and Recreational Focus Area and there is no feasible mitigation which would reduce impacts to a less-than significant level. This impact would be significant and unavoidable.

A statement of overriding consideration was adopted with certification of the 2013 FEIR. • Impact AES-4: The Plan would not create a new source of substantial light or glare which would adversely affect day or nighttime views in the area subject to compliance with NMC regulations intended to limit adverse light and glare impacts and the implementation of General Plan Policies LU4.7 and PROS-3.5. This impact is considered less than significant.

General Plan Policies and Actions would render most impacts less than significant; however not all impacts may be reduced to less than significant levels. A statement of overriding consideration was adopted with the certification of the 2013 FEIR.

Project Consistency with the 2013 FEIR
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 19

4.1(a) (Scenic Vistas) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that there are no designated scenic vistas within the City and the General Plan does not identify any specific vistas or views for special protection in the future. However, views of the Coyote Hills to the northeast, of Mission Peak to the east, and of the East Bay Hills to the east and southeast are available from open spaces within the Plan Area.

The 2013 FEIR concluded impacts to scenic vistas would be less than significant with implementation of the General Plan.

The Project proposes the demolition of one existing single-story warehouse structure on a largely vacant site and the construction of an approximately 50-foot-tall industrial facility. The closest open spaces to the Project site are Jerry Raber Ash Street Park 3,172 feet to the west of the Project Site on Enterprise Drive and Civic Center Park accessed from Newark Boulevard via Civic Center Avenue 3,279 feet to the north of the Project Site. The Project’s 49’-6” height would not impact scenic views from either park as the existing developments within sightline of the Project are already obscured by existing developments. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.1(b) (Scenic Highways) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that there are no State designated scenic highways in or adjacent to Newark. Accordingly, the Project will have no impact on scenic resources within a state scenic highway. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.1(c) (Scenic Quality) No Change Relative to the 2013 FEIR: The 2013 FEIR determined there would be significant and unavoidable impacts related to scenic quality in the Southwest Newark Residential and Recreational Focus Area. The Project is not within the Southwest Newark Residential and Recreational Focus Area, located approximately 1.5 miles southeast of the Project site. Additionally, the following apply to the Project:
• The Project proposes an industrial use that is consistent with the General Industrial (GI) zoning designation applicable to the 17.4-acre Project site and the surrounding area. • The Project would comply with Policy LU-4.12 of the City’s General Plan, requiring that the fences and gates be compatible with adjacent structures.
• The Project would be subject to design review, ensuring compliance with Policy LU-2.2 requiring contextsensitive design and positive impacts to the visual quality of neighborhoods. • The Project would not have any substantial adverse effect on scenic vistas as discussed in 4.1(a) and would not conflict with General Plan Policy LU-4.14, regarding the protection and enhancement of panoramic views and vistas of horizon features such as Mission Peak, the East Bay, Peninsula Hills, Coyote Hills, and San Francisco Bay.

Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.1(d) (Lighting and Glare) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that future development under the General Plan may create new sources of light and glare but determined that in the urbanized context of Newark, this increase would not substantially and adversely affect daytime or nighttime views. The 2013 FEIR identified compliance with the NMC regulations intended to limit adverse light and glare impacts and the implementation of General Plan Policies LU-4.7 and PROS-3.5 as the means to address adverse light and glare impacts.

The Project’s exterior lighting would comply with LU-4.7 and all other applicable provisions of the NMC implemented through Design Review. Proposed exterior lighting will consist of post and wall mounted downward facing LED lighting fixtures up to 4,000 Kelvin and be directed on-site and not create glare off-site.

Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion and Environmental Conditions of Approval
The Project would not result in any substantial new or more severe impacts relative to aesthetics than those City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 20
identified in the 2013 FEIR. The Project would be required to comply with City of Newark regulations that implement General Plan policies and Zoning Code standards intended to limit adverse light and glare impacts captured in the following environmental condition of approval:

COA AES-1: All exterior lighting shall comply with all applicable regulations in NMC §17.17.060 (Lighting and Illumination) and NMC Chapter 17.23 (Parking and Loading). All exterior lighting shall be directed on-site so as not to create glare off-site, as required by the Community Development Director.

4.2. AGRICULTURAL AND FORESTRY RESOURCES
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural use?
b) Conflict with existing zoning for agricultural use, or a Williamson Act contract?
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code
section 12220(g)), timberland (as defined by Public
Resources Code section 4526), or timberland zoned
Timberland Production (as defined by Government
Code section 51104(g))?
d) Result in the loss of forest land or conversion of
forest land to non-forest use?
e) Involve other changes in the existing environment
which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or
conversion of forest land to non-forest use?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013; and California Department of Conservation Farmland Mapping and Monitoring Program.

General Plan EIR Findings
The 2013 General Plan Tune Up EIR determined under Chapter 7.1 that implementation of the General Plan would not result in any potentially significant impacts to agricultural and forestry resources because the city is located in a highly urbanized sector of Alameda County. There is no active timberland production in Newark or the surrounding area nor are there any forest resources or timberland resource zones in the general vicinity of the Plan Area. The conversion of agricultural uses in the Plan Area to non-agricultural uses would not make a cumulatively considerable contribution to the loss of agricultural lands in the surrounding area.

Project Consistency with the 2013 FEIR

4.2(a-e) (Farmland, Agricultural Land, Forest Land) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that buildout would result in a less than significant impact to agricultural resources. The Project site is an infill development with existing structures and paving on site. It does not contain farmland or forest City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 21
land pursuant to Section 12220(g) of the Public Resources Code. Since the Project is within the scope of development projected under the General Plan/Specific Plan and the 2013 FEIR, there would be no additional impacts to agricultural and forestry resources beyond those analyzed in the 2013 FEIR.

Conclusion
The Project would not result in any new or more severe impacts relative to agricultural and forestry resources than those identified in the 2013 FEIR. The Project consists of development within an urban context that would not impact agricultural or forestland resources and is consistent with the City’s General Plan. No environmental conditions of approval related to agriculture and forestry resources are required.

4.3. AIR QUALITY
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Conflict with or obstruct implementation of the
applicable air quality plan?
b) Result in a cumulatively considerable net increase
of any criteria pollutant for which the project region is non-attainment under an applicable federal or state
ambient air quality standard?
c) Exposure of sensitive receptors to substantial
pollutant concentrations?
d) Result in other emissions (such as those leading to
odors) adversely affecting a substantial number of
people?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013, Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the 6756 Central Avenue Warehouse Project, City of Newark, Alameda County, California, dated July 19, FirstCarbon Solutions.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to air quality in Chapter 4.2 of the General Plan Tune Up EIR and determined the following:
• Impact AIR-1: Buildout of the proposed project (General Plan) would not be consistent with the Bay Area Clean Air Plan (2010) because the projected vehicle miles traveled (VMT) increase from the build out would be greater than the projected population increase. Although the General Plan contains goals, policies and actions to address future increase in VMT and criteria air pollutants, the impact would be significant and unavoidable, and there are no available mitigation measures. A statement of overriding consideration was adopted with certification of the 2013 FEIR. • Impact AIR-2 and AIR-3: Subsequent land use activities associated with implementation of the proposed project (General Plan) would generate an increase in operational and construction related emissions of criteria air pollutants in the Plan area. However, they would not violate any air quality standard or contribute substantially to an existing or projected air quality violation with implementation of General Plan Policies CS-5.1 to CS-5.5, T-1.1 to T-1.3, T-1.6, T-2.1 to T-2.11, T-3.1 to T-3.9, T-4.1 to T-4.9, LU-1.1 to LU-1.4, and LU-4.2 as they relate to operational emissions, and compliance with Bay Area Air Quality Management District (BAAQMD) Basic Control Measures pursuant to General City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 22
Plan Action HW-1.G, and Action HW-1.I as they relate to construction emissions. This impact is considered less than significant.
• Impact AIR-3: Subsequent land use activities associated with implementation of the proposed project (General Plan) would not result in significant impacts with respect to the placement of sensitive receptors proximate to major sources of air pollution or the siting of new sources of air pollution proximate to sensitive receptors in the City subject to implementation of General Plan Policies LU-2.4 and LU-2.C, and Action HW-1. F. This impact is considered less than significant. • Impact AIR-4: Subsequent land use activities associated with implementation of the proposed project (General Plan) would not result in significant impact with regard to creating or exposing a substantial number of people to objectionable odors subject to implementation of General Plan Action HW-1.H, as applicable. This impact is considered less than significant.

Implementation of the General Plan would result in potentially significant air quality impacts. General Plan Policies and Actions would render most impacts less than significant; however not all impacts may be reduced to less than significant levels. A statement of overriding consideration was adopted with the certification of the 2013 FEIR.

Project Consistency with the 2013 FEIR
A report titled “The Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis,” dated July 19, 2024, was prepared by FirstCarbon Solutions (Appendix A). The following discussion is based on this report:

4.3(a) (Conflict with Plan) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR found that build out of the General Plan would result in significant and unavoidable impacts on air quality. The 2013 FEIR determined that while the General Plan would support the primary goals of the 2010 Bay Area Clean Air Plan, buildout of the proposed Plan would not be consistent with the Clean Air Plan because the projected vehicle miles traveled (VMT) increase from buildout of the proposed Plan would be greater than the projected population increase. As it relates to the General Plan, the development proposed by the proposed Project is within the projections analyzed in 2013 FEIR and would not create new impacts, more significant impacts, or a substantial change from the 2013 FEIR.

The Project’s VMT impact would be less than significant because the 14.02 VMT per capita daily generated by the Project’s employees would be less than the applicable VMT per capita threshold of significance of 14.6 VMT per capita. Therefore, the Project’s VMT would not contribute to significant and unavoidable impacts on air quality as a result of the build out of the General Plan. The 2022 BAAQMD CEQA Air Quality Guidelines includes thresholds of significance for construction and operation for emission levels that, if exceeded, may be considered potentially significant impacts. Project-specific analysis of air pollutant emissions (Appendix A) quantifies emission from short-term construction-related activities (e.g., demolition, grading, building, paving, construction equipment, worker trips etc.) and long-term operations of the warehouse use. Air quality emissions generated by the Project would not exceed BAAQMD significance thresholds during construction nor would the ongoing, long-term project operations have the potential to generate a significant quantity of air pollutants, as shown in Tables 1 and 2 below.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 23
Table 1. Construction Emissions
Source: Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the 6756 Central Avenue Warehouse Project, City of Newark, Alameda County, California, July 19, 2024, prepared by First Carbon Solutions.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 24
Table 2. Operational Emissions
Source: Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the 6756 Central Avenue Warehouse Project, City of Newark, Alameda County, California, July 19, 2024, prepared by First Carbon Solutions.

Operational Carbon Monoxide Hotspots
Carbon Monoxide (CO) generated from traffic by the Project are a concern at the local level because congested intersections can result in high, localized concentrations of “CO hotspot.” The BAAQMD screening criteria2 were used to determine whether implementing the Project could result in local carbon monoxide emissions that exceed the thresholds of significance are as follows:
• The project is consistent with an applicable congestion management program established by the county congestion management agency for designated roads or highways, the RTP, and local congestion management agency plans.
• Project-generated traffic would not increase traffic volumes at affected intersections to more than 44,000 vehicles per hour.
2 Bay Area Air Quality Management District (BAAQMD). 2022. CEQA Air Quality Guidelines. April. Website:
https://www.baaqmd.gov/~/media/files/planning-and-research/ceqa/ceqa-guidelines-2022/ceqa-guidelines-chapter-3- thresholds_final_v2-pdf.pdf?la=en. Accessed May 13, 2024.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 25
• Project-generated traffic would not increase traffic volumes at affected intersections to more than 24,000 vehicles per hour where vertical and/or horizontal mixing is substantially limited (e.g. tunnel, parking garage, bridge underpass, natural or urban street canyon, below-grade roadway).

Based on the project-specific transportation analysis3, the existing plus project traffic volumes on these local residential streets would not experience hourly traffic levels above 24,000 and 44,000 vehicles per hour cited in the BAAQMD criteria. Specifically, Figure 10 of the traffic study shows the existing plus project peak-hour turning volumes at 10 studied intersections. As shown in Figure 10, the intersection of Central Avenue and Cherry Street would experience the highest amount of peak-hour volume (3,241 Am peakhour trips and 3,482 PM peak-hour trips). The peak-hours trip volume experienced at this intersection is significantly below the threshold levels of 24,000 and 44,000 vehicles per hour. Therefore, the proposed project would meet all the CO screening criteria and would result in a less than significant impact related to carbon monoxide.

PM10/PM2.5 (fugitive dust) is recognized to impact local communities. During construction, fugitive dust would principally be generated from demolition, site grading, and other earthmoving activities. The BAAQMD does not have a quantitative threshold of significance for fugitive dust emissions. The BAAQMD determination of significance for fugitive dust is based on implementing effective control measures. Action HW-1.G identified in the 2013 FEIR as set forth in the General Plan requires the use of BAAQMD-recommended basic Best Management Practices (BMPs) to limit emissions of construction-related criteria pollutants, including fugitive dust. The Project will be required to implement the BMPs from the latest BAAQMD CEQA Air Quality Guidelines, consistent with Action HW-1. G. Condition of approval COA AQ-1 imposes on the Project the BMPs for controlling fugitive dust. With the implementation of COA AQ-1, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.3(b) (Increase Criteria Pollutants) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that cumulative impacts related to criteria air pollutant increases would be the same as the Planspecific impacts. The Project is consistent with the projected buildout of the General Plan. At the Project-level, analysis of criteria pollutant emissions from development of the Project, as described above in 4.3(a), indicate that the Project would have emissions that are below the BAAQMD thresholds of significance as shown in Table 1 and 2 above. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.3.(c) (Sensitive Receptors) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined impacts to sensitive receptors would be less than significant with the implementation of General Plan Policies LU-2.4 and Actions LU-2.C and Action HW-1. F. In accordance with Action LU-2.C, the Project would require the approval of a Conditional Use Permit to improve compatibility between the use proposed by the Project and surrounding uses and limit adverse activity.

The Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis, dated July 19, 2024, prepared by FirstCarbon Solutions, includes an analysis of health risk and hazard on sensitive receptors within a 1,000- foot radius of the Project site. The BAAQMD defines a sensitive receptor as “Facilities or land uses that include members of the population that are particularly sensitive to the effects of air pollutants, such as children, the elderly, and people with illnesses.” The sensitive receptors have been expanded to include off-site workers and students per 2022 BAAQMD Guidelines. Sensitive receptors in the proximity of the Project site, include:
• Residential uses approximately 750 feet away.
• Multi-family residences to northwest to the south of Cherry Street, 800 feet way. • Single-family residences north of Cherry Street, approximately 1,000 feet away.

The proposed project would result in a potentially significant impact on sensitive receptors if any of the following three criteria are met:
3 Bay Area Air Quality Management District (BAAQMD). 2022. CEQA Air Quality Guidelines. April. Website:
https://www.baaqmd.gov/~/media/files/planning-and-research/ceqa/ceqa-guidelines-2022/ceqa-guidelines-chapter-3- thresholds_final_v2-pdf.pdf?la=en. Accessed May 13, 2024.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 26
• Criterion 1: Construction of the proposed project would exceed the BAAQMD health risk significance thresholds.
• Criterion 2: Operation of the proposed project would exceed the BAAQMD health risk significance thresholds.
• Criterion 3: The proposed project would locate new sensitive receptors (residents) that could be subject to existing sources of TACs at the project site which exceed the BAAQMD cumulative health risk significance thresholds.

Criterion 1: As discussed above, the sensitive receptors near the project site include residents and off-site workers. Of these sensitive receptors, AERMOD dispersion modeling of construction emissions shows that the maximally exposed individual resident (MEIR) is a residence located on Manzanita Street approximately 1,750 feet away. The maximally exposed individual worker (MEIW) is located in an industrial use area immediately east of the Project site. The MEIR is outside of the 1,000 feet zone of potential impact since all the residential receptors in this zone are immediately upwind from the site and are not significantly influenced by the site emissions. To capture the maximum impact, the dispersion modeling and HRA analysis extended the zone of impact for residences in the downwind direction. Detailed summaries of the HRA results and maps of the MEIR and MEIW locations are included with supporting information in Appendix A Table 3, below, summarizes the cancer risk and chronic HI results for the proposed project construction at the MEIR and MEIW locations that show that the construction diesel particulate matter (DPM) and PM2.5 emissions generated by the Project would not result in an exceedance of BAAQMD cancer risk and chronic non-cancer HI thresholds at any location. Therefore, Project construction would not result in significant health impacts to nearby sensitive receptors.

Table 3. Estimated Cancer Risks and Chronic Non-Cancer Hazards Criterion 2: For project operation, potential TAC emissions would be from the exhaust of the trucks entering, exiting, and idling on the site. Projects with the potential for health risk from DPM are those with high level of City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 27
truck traffic, or sites where trucks with TRUs (small diesel engines used to run refrigeration devices on trucks) idle for a significant amount of time. According to the guidance in the ARB’s Air Quality and Land Use Handbook, new sensitive land uses should be avoided within 1,000 feet of a distribution center (that accommodates more than 100 trucks per day, more than 40 trucks with operating Transport Refrigeration Units (TRUs) per day, or where TRU unit operations exceed 300 hours per week).

The Project’s traffic analysis estimates the daily heavy heavy-duty (HHD) truck trips accessing the project site would be 142 trips, which is approximately 71 HHD trucks per day and below the 100-truck advisory threshold in the Air Quality and Land Use Handbook. Therefore, an operational HRA is not required to be prepared for the proposed project. Since the facility would be designed and limited to dry storage only and would not involve cold storage, the 71 truck visits (142 trips) would not involve any operating TRU units that could contribute additional DPM. Additionally, the nearest residences are located 750 feet away, and emission dispersion modeling shows that due to wind directions the maximum impacted residential receptors are over 1,700 feet away.

Therefore, risks due to DPM from this level of truck traffic would be less than significant and the proposed project would not generate a significant amount of DPM or other TAC emissions during operation and would not result in significant health impacts to nearby sensitive receptors during operation.

Criterion 3. When existing sensitive receptors, as identified above under 4.3.(c), within 1,000 feet of the Project site, are subject to the localized risks and hazards that are less than the BAAQMD thresholds, the Project's contribution to a significant cumulative impact can be rendered less than cumulatively considerable. The proposed project is an industrial project and would not site new sensitive receptors (residents) that could be subject to existing sources of TACs at the Project site which exceed the BAAQMD cumulative health risk significance thresholds. Therefore, the cumulative health risks to new sensitive receptors that could be subject to existing sources of TAC at the Project site would be less than significant.

4.3(d) (Odors) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts due to odors would be less than significant with implementation of General Plan Action HW-1.H, which requires an evaluation of the potential for proposed projects to emit nuisance odors beyond the property line and that property owners submit odor management plans consistent with BAAQMD regulations.

General Plan Action HW-1.H requires an evaluation of the potential for the Project to emit nuisance odors beyond the property line and requires that property owners submit odor management plans consistent with BAAQMD regulations. In that regard, the BAAQMD does not have a recommended odor threshold for construction activities. However, the BAAQMD recommends operational screening criteria based on the distance between receptors and types of sources known to generate odors.

Construction odor could result from diesel exhausts or ROGs. However, they would disperse rapidly from the Project site and would not affect a substantial number of people. As shown in Table 5-4, Odor Screening Distances, in Chapter 5 Project-level Air Quality Impacts, 2022 BAAQMD CEQA Guidelines4 identify the following land uses typically associated with objectionable odors that include:
• wastewater treatments plants,
• compost facilities,
• landfills,
• solid waste transfer stations,
• fiberglass manufacturing facilities,
• paint/coating
• operations (e.g., auto body shops),
• dairy farms,
• petroleum refineries,
• asphalt batch plants,
• chemical manufacturing, and
4 Bay Area Air Quality Management District (BAAQMD). 2022. BAAQMD CEQA Guidelines, Chapter 5 Project-level Air Quality Impacts, Table 5-4, Odor Screening Distances.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 28
• food manufacturing facilities.

As indicated in the Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the Project, the warehouse would likely not generate objectionable odors that may affect a substantial number of nearby receptors. Minor sources of odors that would be generated by the proposed Project, such as exhaust from mobile sources, are not typically associated with numerous odor complaints but are known to have temporary and less concentrated odors. The nearest sensitive receptor is approximately 750 feet from the Project site and in an upwind direction. Because of distance from this sensitive receptor, operation of the proposed Project would not have an impact related to odors. Therefore, operational odor impacts would be less than significant.

Odors that may be emitted from construction equipment and vehicles during construction are temporary in nature and would be minimized through best management practices. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant odor impact relative to the 2013 FEIR.

Conclusion and Environmental Conditions of Approval
The proposed Project is within the scope of development projected under the General Plan, and there would be no additional impacts to air quality beyond those analyzed in the 2013 FEIR. The following environmental conditions of approval would apply to the Project in accordance with Actions HW-1.G included in the General Plan.

COA AQ-1: The following dust control measures, as recommended by the Bay Area Air Quality Management District (BAAQMD), shall be included in the design of the proposed Project and implemented during construction:
• All exposed non-paved surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and access roads) shall be watered at least two times per day and/or non-toxic soil stabilizers shall be applied to exposed non-paved surfaces.
• All haul trucks transporting soil, sand, or other loose material off-site shall be covered and/or shall maintain at least 2 feet of freeboard.
• All visible mud or dirt tracked out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. • All vehicle speeds on unpaved roads shall be limited to 15 miles per hour. • All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. • Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes, as required by the California Airborne Toxics Control Measure (ATCM) Title 13, Section 2485 of California Code of Regulations. Clear signage regarding idling restrictions shall be provided for construction workers at all access points. • All construction equipment shall be maintained and properly tuned in accordance with the manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.
• The prime construction contractor shall post a publicly visible sign with the telephone number and person to contact regarding dust complaints. The construction contractor shall take corrective action within 48 hours. The BAAQMD’s and the City’s phone numbers shall also be visible to ensure compliance with applicable regulations.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 29

4.4. BIOLOGICAL RESOURCES
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species
identified as a candidate, sensitive, or special status species in local or regional plans, policies, or
regulations, or by the California Department of Fish
and Game or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US
Fish and Wildlife Service?
c) Have a substantial adverse effect on state or
federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct
removal, filling, hydrological interruption, or other
means?
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state habitat conservation plan?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
Biological resources are protected by federal and state statutes including the Federal Endangered Species Act (FESA), the California Endangered Species Act (CESA), the Clean Water Act (CWA), and the Migratory Bird Treaty Act (MBTA) which affords protection to migratory bird species including birds of prey. These regulations provide legal protection for identified plant and animal species of concern and their habitat.

The 2013 FEIR evaluated potential impacts to biological resources in Chapter 4.3 and determined the following:
• Impact BIO-1: Implementation of the proposed project (General Plan) would not have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service, This impact is considered less than significant subject to the implementation of General Plan Policies CS-1.1 to 1.3, CS-2.1 to CS-2.7, and Actions CS-1.A and CS-2.C.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 30
• Impact BIO-2: Implementation of the proposed project (General Plan) would not have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service in the Plan Area. This impact is considered less than significant, subject to the implementation of mitigation measures MM BIO-2.1 to 2.5 from the Area 3 and 4 Specific Plan EIR, as applicable, and implementation of General Plan Goal CS-2, Policies CS-1.1, CS-1, CS-4, CS-3.4 to CS-3.6, and Actions CS1.A, CS2.B, CS2.C, CS3.H, CS T-2B.
• Impact BIO-3: Implementation of the proposed project (General Plan) would not have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means, This impact will be less than significant. subject to the implementation of General Plan Goal CS-1, Policies CS-2.3 to CS-2.5, CS-2.8, and Actions CS2.B, CS2.C, CS.E, CS T-2.B. • Impact BIO-4: Implementation of the proposed project (General Plan) would not interfere substantially with the movement of any native resident or migratory fish or wildlife species, or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites. This impact is considered less than significant subject to the implementation of General Plan Policies CS-1.2, CS1.3, CS-2.1, CS-2.3, CS-2.5, and Actions CS1.A, Actions CS2.B, Actions CS2.E. • Impact BIO-5: Implementation of the proposed project (General Plan Update) would not conflict with the City of Newark tree preservation ordinance, subject to the implementation of General Plan Goal CS-4, Policies CS-4.1 and CS-4.3, and Actions CS4.A, CS4.D. This is considered a less than significant impact.
• Impact BIO-6: Implementation of the proposed project (General Plan) would result in less than significant impact to the Basin Plan and Habitat Goals, local and regional habitat conservation planning initiatives relevant to Newark. This impact is considered less than significant, subject to implementation of General Plan Policies CS-2.4, CS-2.5, CS-2.8, and Actions CS-2.B, CS2-C, CS-2.E. • Impact BIO-7: Implementation of the proposed project (General Plan) would result in less-than significant cumulative impacts related to biological resources. This impact is considered less than significant with adherence to applicable federal, State, and local regulations and implementation of mitigation measures identified in the previous Area 3 and 4 Specific Plan and the Dumbarton TOD Specific Plan EIRs previously certified by the City of Newark Project Consistency with the 2013 FEIR

4.4(a) (Special-Status Species and Sensitive Communities) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined there would be less than significant impacts to special-status species in the Plan Area with implementation of federal, state, and local regulations and applicable General Plan policies and actions. According to the 2013 FEIR, the urbanized portions of the Plan Area are considered to have low habitat value for biological resources. The Project site is located in an urban portion of the City and consists largely of impervious surfaces. Additionally, the site was previously developed and has minimal vegetation to support special-status species and/or sensitive communities. Existing trees may provide nesting habitat for passerines and/or raptors. If tree removal is to occur, COA BIO-1 shall be implemented, to avoid any impacts to nesting birds present on the site. As a result, the Project would not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR with respect to candidate, sensitive, or special-status species.

4.4(b) (Adverse Effects to Sensitive Natural Communities) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that compliance with applicable federal, state, and local regulations and applicable General Plan policies and actions would reduce potential impacts to wetlands, riparian habitat, and sensitive natural communities to a less than significant level. Figure 4.3-2 in the 2013 FEIR shows annual City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 31
grassland on a portion of the proposed Project site that provides habitat for foraging and breeding for birds, mammals, and reptiles. However, most of the Project site has previously been developed for a materials storage yard and consists of impervious surfaces with limited vegetation. Thus, the conditions of the site are not suitable for sensitive natural communities. Therefore, the Project would not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR with respect to sensitive natural communities.

4.4(c) (Adverse Effects to Jurisdictional Waters) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that compliance with applicable General Plan goals, policies, and actions would reduce potential impacts to waters of the U.S. to a less than significant level. The Project site largely consists of impervious surfaces and the surrounding vicinity is characterized by urban development including paving and buildings.

There are no water bodies in the vicinity of the Project site and, as shown in Figure 4.3-1 in the 2013 FEIR, there are no wetlands on the Project site. The Project would have no impact on state or federally protected wetlands and would, therefore, not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR with respect to jurisdictional waters.

4.4(d) (Adverse Effect on Wildlife Movement) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that compliance with applicable General Plan policies and actions would reduce impacts associated with the substantial interference with the movement of any native resident or migratory fish or wildlife species, or with established native resident or migratory wildlife corridors, or impeding the use of native wildlife nursery sites to a less than significant level. Given the urban setting of the Project site and the surrounding development, there is minimal opportunity for wildlife movement. Additionally, the site is currently enclosed by a fence and has limited vegetation to support wildlife. Therefore, the Project would not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR with respect to movement of any wildlife.

4.4(e) (Conflict with Local Ordinances) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that compliance with City’s tree preservation ordinance and applicable General Plan goals, policies, and actions would reduce potential adverse impacts to trees within the Plan Area to a less than significant level.

The Project site contains ten mature non-deciduous trees between the existing concrete building and Central Avenue. These trees are proposed for removal in the process of development that could result in potential impacts to nesting birds. COA BIO-1 will render any impact to nesting birds to a less than significant level.

Additionally, prior to development, the Project would be subject to compliance with the tree preservation ordinance, which includes the requirement of a tree removal permit, as indicated in COA BIO-2. Additionally, the Project would be subject to compliance with applicable General Plan goals, policies, and actions, namely, Goal CS-4, Policies CS-4.1 and CS-4.3, and Actions CS4.A, CS4.D. Therefore, the Project would not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.4(f) (Conflict with Habitat Conservation Plans) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that compliance with applicable federal, state, and local regulations, applicable General Plan policies and actions would reduce impacts related to conflicts with the Basin Plan and Baylands Ecosystem Habitat Goals (Habitat Goals) to a less than significant level. There are no Habitat Conservation Plans (HCPs) as defined in the federal Endangered Species Act Section 10(a)(2)(A), in the General Plan Area. However, there are local and regional habitat conservation planning initiatives relevant to the City of Newark, which include the Baylands Ecosystem Habitat Goals (Habitat Goals) and the Basin Plan. The Basin Plan and Habitat Goals focus mainly on wetland restoration, conservation, and enhancement. Since there are no wetlands on the proposed Project site, these plans are not applicable. As such, the Project would not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR with respect to conflict with Habitat Conservation Plans.

Conclusion and Environmental Conditions of Approval
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 32
The Project would not result in any new or more severe impacts to biological resources relative to what was identified the 2013 FEIR. The Project would result in the removal of 10 existing trees along the Project site’s frontage along Central Avenue. The following environmental conditions reflect best practices:

COA BIO-1: To avoid and minimize potential impacts to nesting birds including passerines and raptors, the following measures shall be implemented:

1. Grading or removal of potentially occupied habitat shall be conducted outside the nesting season, which occurs between approximately February 1 to August 31.

2. If grading between August 31 and February 1 is infeasible and groundbreaking must occur within the nesting season, a pre-construction nesting bird survey (migratory species, passerines, and raptors) of the potentially occupied habitat (trees, shrubs, grassland) shall be performed by a qualified biologist within 7 days of groundbreaking. If no nesting birds are observed no further action is required and grading shall occur within one week of the survey to prevent “take” of individual birds that could begin nesting after the survey.

3. If active bird nests (either passerine and/or raptor) are observed during the preconstruction survey, a disturbance-free buffer zone shall be established around the occupied habitat until the young have fledged, as determined by a qualified biologist. The radius of the required buffer zone can vary depending on the species, (i.e., 75-100 feet for passerines and 200-500 feet for raptors). The dimensions of any required buffer zones shall be determined by a qualified biologist.

4. To delineate the buffer zone around the occupied habitat, construction fencing shall be placed at the specified radius from the nest within which no machinery or workers shall intrude.

5. Biological monitoring of active nests shall be conducted by a qualified biologist to ensure that nests are not disturbed and that buffers are appropriate, adjusted by a qualified biologist as needed to avoid disturbance.

6. No construction or earth-moving activity shall occur within any established nest protection buffer prior to September 1 unless it is determined by a qualified ornithologist/biologist that the young have fledged (that is, left the nest) and have attained sufficient flight skills to avoid project construction zones, or that the nesting cycle is otherwise completed.

COA BIO-2: Prior to any tree removal or alteration, the applicant shall obtain a tree removal permit from the City of Newark Public Works Department and implement tree planting requirements in accordance with development review.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 33

4.5. CULTURAL RESOURCES
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Cause a substantial adverse change in the
significance of a historical resource pursuant to §
15064.5?
b) Cause a substantial adverse change in the
significance of an archaeological resource pursuant to
§ 15064.5?
c) Disturb any human remains, including those
interred outside of formal cemeteries?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to cultural resources in Chapter 4.4 and determined the following:
• Impact CULT-1: Implementation of the proposed project (General Plan) would not cause a substantial adverse change in the significance of a historical resource as defined in Section 15064.5. This impact is considered less than significant subject to implementation of Mitigation Measure 4.4-2 from the 2010 Newark Housing Element EIR that pertains to the Old Town portion of Newark, Mitigation Measure

4.4-1b from the Dumbarton Transit-Oriented Development (TOD) Specific Plan EIR that pertains to the Dumbarton TOD Focus Area (now known as Bayside Newark) and General Plan Goal LU-5, Policies LU-5.1 to LU-5.4, and Actions LU5.A to LU5.E. for the Plan area overall. • Impact CULT-2: Construction activities associated with the implementation of the proposed project (General Plan) could cause a significant impact to archaeological resources in the Southwest Newark Residential and Recreational Focus Area by potentially damaging or disturbing undiscovered archaeological deposits through the placement of fill and soil compression. Regulatory compliance and the implementation of General Plan Policy LU-5.5 would reduce but not eliminate the potential for damage or disturbance and no additional feasible mitigation exists to further reduce this impact in the Newark Residential and Recreational Focus Area. Therefore, impacts to archaeological resources in the Southwest Newark Residential and Recreational Focus Area would be significant and unavoidable.

A statement of overriding consideration was adopted with certification of the 2013 FEIR.

In the rest of the Plan area this impact would be rendered less than significant with implementation of Mitigation Measure 4.4-1 from the 2010 Housing Element EIR, and Mitigation Measure CUL-2.1 to CULT-2.4 from the Area 3 and 4 Specific Plan EIR, as applicable, and the implementation of General Plan Policy LU-5.5.
• Impact CULT-3, related to paleontological resources is discussed under Geology and Soils. • Impact CULT-4: Construction activities associated with the implementation of the proposed project (General Plan) could cause a significant impact to Native American human remains in the Southwest Newark Residential and Recreational Focus Area by potentially damaging or disturbing undiscovered Native American human remains through the placement of fill and soil compression. Compliance with the provisions of SB18, California Health and Safety Code Section 7052 and 7050.5, and California Public Resources Code Section 5097 and 15064.5 together with the implementation of Mitigation Measure 4.4-1 from the 2010 Housing Element EIR, and Mitigation Measures CUL-2.1 through CUL- City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 34

2.4 from the Area 3 and 4 Specific Plan EIR would reduce this impact. However, damage or disturbance of human remains through the placement of fill and soil compression could still result in a significant impact during construction activities associated with buildout of the General Plan and no additional feasible mitigation exists to further reduce this impact Therefore, impacts to human remains, including those interred outside of formal cemeteries in the Southwest Newark Residential and Recreational Focus Area would be significant and unavoidable. A statement of overriding consideration was adopted with certification of the 2013 FEIR. • Impact CULT-5: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable projects, would result in less than significant cumulative impacts with respect to cultural resources subject to compliance with federal and State laws protecting cultural resources.

Implementation of the General Plan would result in significant and unavoidable impacts to archaeological resources and human remains in the Southwest Newark Residential and Recreational Focus Area. In other locations in the Plan area, mitigation measures, General Plan Policy LU-5.5 and Actions as identified above would render impacts to cultural resources less than significant. A statement of overriding consideration was adopted with the certification of the 2013 FEIR because not all impacts in the Southwest Newark Residential and Recreational Focus Area may be reduced to less than significant levels.

Project Consistency with the 2013 FEIR

4.5(a) (Historic Resources) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that no substantial adverse impacts related to historic resources would occur within the Plan area. The Project site is currently developed with a single-story 39,539 square foot concrete warehouse constructed in 1984 and uncovered storage yards east of the warehouse and along the northwestern property line. The existing building on the site is less than 45 years old and is not a historic resource for which a historic resource evaluation would be required pursuant to CEQA. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.5(b) (Archaeological Resources) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined substantial adverse impacts to be less than significant subject to implementation of the policies set forth in the General Plan, as identified above. As applicable to the Project site, the 2013 FEIR concluded that compliance with General Plan Policy LU-5.5 would ensure that subsequent development projects result in less than significant impacts to archaeological resources. General Plan Policy LU-5.5 requires coordination with local tribal representatives and the Native American Heritage Commission to ensure the protection of Newark’s Native American resources and to follow appropriate mitigation, preservation, and recovery procedures in the event that important resources are identified during development.

The City implemented General Plan Policy LU-5.5 by contacting the Native American Heritage Commission for a Sacred Lands File Search that did not identify the subject site as Native American Sacred Lands. No California Native American tribes have requested notice from the City of Newark of proposed projects in the city. Additionally, the City incorporates a condition of approval as protocols for unanticipated cultural resource finds. Accordingly, with implementation of COA CUL-1 specified below, the Project will result in less than significant impacts from a substantial adverse change in the significance of an archaeological resource, if encountered during construction. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR with respect to archaeological resources.

4.5(c) (Discovery of Human Remains) No Substantial Change Relative to the 2013 FEIR: In the event human remains are discovered during ground disturbing activities, the Project shall comply with COA CUL-1, which requires the immediate cessation of ground disturbing activities near or in any area potentially overlying adjacent human remains and contacting the City and County Coroner upon the discovery of any human remains and provisions of state law carried out, which include immediately contacting the Native American Heritage Commission, if it is determined by the City, and County Coroner that the discovered remains are of Native American descent. Compliance with COA CUL-1 as well as California Health and Safety Code Section City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 35
7050.5 and performance of actions therein will ensure that in the event of accidental discovery of historically significant remains the Project will result in less than significant impacts. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion and Environmental Condition of Approval
The Project would not result in any new or more severe impacts to archaeological resources relative to what was identified the 2010 FEIR. The Project site is not within the Dumbarton TOD Focus Area (now known as Bayside Newark) or the Southwest Newark Residential and Recreational Focus Area where the significant impacts were found. Implementation of COA CUL-1 below, specified in accordance with Mitigation Measure

4.4-1 from the 2010 Housing Element EIR will ensure that the Project does not result in impacts to buried archaeological resources onsite, if present.

COA CUL-1: During project construction, if historic, archaeological or Native American materials or artifacts are identified, work within 50-foot radius of such find shall cease and the City shall retain the services of a qualified archeologist and/or paleontologist to assess the significance of the find.

If such find is determined to be significant by the archeologist and/or paleontologist, a resource protection plan conforming to CEQA §15064.5 shall be prepared by the archeologist and/or paleontologist and approved by the Community Development Director. The plan may include, but would not be limited to, removal of resources and similar actions. Project work may be resumed in compliance with such plan. If human remains are encountered, all ground disturbing activities near or in any area potentially overlying adjacent human remains shall cease, the County Coroner shall be contacted immediately, and the provisions of State law carried out.

4.6. ENERGY
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Result in potentially significant environmental
impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR addresses energy in Chapter 4.2, Air Quality and Chapter 4.6, Greenhouse Gas Emissions, with reference to the control measures from the 2010 Bay Area Clean Air Plan related to energy use, water use and waste generation, and identifies various General Plan policies and actions that would support these measures. These policies and actions, include but are not limited to, green building (Policies CS-6.2, CS-6.3, and CS-6.4, and Actions CS-6.B, CS-6.C and CS-6.D), building codes (Action CS-6.A), and energy efficiency and use (Policies CS-7.1, CS-7.2, CS-7.3, CS-7.4, CS-7.5, and Action CS-7.A, CS-7.B, Action CS-7.C, CS7.D, and CS-7.F) and implementation of the City’s Climate Action Plan programs (Action CS-7.E).

Project Consistency with the 2013 FEIR
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 36

4.6(a-b) (Energy Consumption) No Change Relative to the 2013 FEIR: The Project consists of the construction and operation of an industrial development that would be subject to the applicable General Plan policies regarding green building and energy use and current building code standards requiring energy efficiency in new industrial construction. The Project would be subject to the latest energy efficiency standards as well as other green building standards pursuant to Title 24, with conformance ensured through the City’s building permit review process.

The Project will maintain compliance with the 2015 Water Efficient Landscape Ordinance thereby contributing to a reduction in energy expended to treat and convey water. Construction of the Project would be subject to the BAAQMD best management practices that require minimizing idling time and maintaining construction equipment to manufacturer’s specifications that would reduce inefficient consumption of fuels. As an industrial development subject to the latest building code and construction standards, energy consumption of the Project would neither be wasteful or inefficient nor would it obstruct a state or local plan for renewable energy or energy efficiency. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion
The Project would not result in any new or more severe impacts to energy relative to what was identified in the 2013 FEIR. The Project would be required to comply with the latest energy efficiency standards as a new construction. Additionally, it is subject to uniformly applied development standards including review of construction plans by building officials to verify compliance with the most recent building codes. No environmental conditions of approval related to energy are required.

4.7. GEOLOGY AND SOILS
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Directly or indirectly cause potential substantial
adverse effects, including the risk of loss, injury, or death involving:
i) Rupture of a known earthquake fault, as delineated
on the most recent Alquist-Priolo Earthquake Fault
Zoning Map issued by the State Geologist for the area
or based on other substantial evidence of a known
fault? Refer to Division of Mines and Geology Special
Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including
liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or the loss of
topsoil?
c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the
project, and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction
or collapse?
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 37
d) Be located on expansive soil, as defined in Table
18-1-B of the Uniform Building Code (1994), creating
substantial direct or indirect risks to life or property? e) Have soils incapable of adequately supporting the
use of septic tanks or alternative waste water disposal systems where sewers are not available for the
disposal of waste water?
f) Directly or indirectly destroy a unique
paleontological resource or site or unique geologic
feature?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013; and Geotechnical Investigation, prepared by Cornerstone Earth Group, October 13, 2022.

General Plan EIR Findings
The 2013 FEIR evaluated the potential impacts related to geology and soils in Chapter 4.5 and determined the following.
• Impact GEO-1: Implementation of the proposed project (General Plan), would not expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving surface rupture along a known active fault; strong seismic ground shaking; seismic-related ground failure, including liquefaction; and landslides. The impact is considered less than significant, subject to compliance with the City of Newark Code. Such compliance would ensure that construction, grading, and related activities meet California Building Code standards, implement erosion control methods, and provide, where required, a professionally prepared soils engineering report, engineering geology report, a liquefaction study, and a geotechnical report in identifying seismic hazards for any projects located in a seismic hazard zone. Additionally, implementation of General Plan Goal EH-2, Policies EH-1.1, EH-1.2 EH2.1 to EH-2.4, and Actions EH-1.A, EH-1.B, EH-2.A to EH-2.F would further address impacts related to ground shaking and liquefaction. • Impact GEO-2: Implementation of the proposed project (General Plan) would not result in substantial soil erosion or the loss of topsoil. This impact is considered less than significant subject to implementation of the General Plan Goal CS-1, Policy CS-1.4, and Action CS-1.B, and Mitigation Measure 4.5-1 from the Housing Element EIR and Mitigation Measure 4.5-1 from the Dumbarton TOD EIR that pertain to development of complexes containing four or more dwellings on a housing site, or for major remodel projects on such complexes, and development in the Dumbarton TOD area, respectively.
• Impact GEO-3: Implementation of the proposed project (General Plan) would not result in a significant impact related to development on unstable geologic units and soils or result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse. This impact is considered less than significant with the implementation of the City of Newark Code as described above and General Plan Goal EH1, Policies EH-1.1 and EH-1.2, and Actions EH-1.A, EH-2.A and EH-2.B. • Impact GEO-4: Implementation of the proposed (General Plan) would not create substantial risks to life or property as a result of its location on expansive soil, as defined in Table 18-1-b of the Uniform Building Code (1994). This impact is considered less than significant, subject to the implementation of General Plan Goal EH-1, Policies EH-1.1 and EH-1.2, EH-2.4, and Actions EH-1.A, EH-2.A and EH2.B and Mitigation Measure 4.5-1 from the Housing Element EIR and Mitigation Measure 4.5-1 from the Dumbarton TOD EIR that pertain to development of complexes containing four or more dwellings on a housing site, or for major remodel projects on such complexes, and development in the Dumbarton TOD area, respectively. Additionally, implementation of the City of Newark Code, as described above, would further reduce this impact to a less than significant level.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 38
• Impact GEO-5: Implementation of the proposed project (General Plan) would not result in impacts associated with the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater. As sewers are available for disposal of wastewater there will be no impact.
• Impact GEO-6: Implementation of the proposed project (General Plan) in combination with existing, planned, proposed, and reasonably foreseeable development, would not contribute to cumulative geologic, seismic, and soil impacts, as the impacts are often site-specific and not additive in character.

Therefore, there would be no cumulatively considerable impacts related to Geology and Soils as a result of the proposed project (General Plan). Additionally, there would be further protection with compliance with the City of Newark Code, and implementation of Mitigation Measure 4.5-1 from the Housing Element EIR and Mitigation Measure 4.5-1 from the Dumbarton TOD EIR , as described above as well as the following General Plan goals, policies, and actions: Goals EH-1, EH-2, CS-1, Policies EH-1.1, EH-1.2, EH-2.1 to EH-2.4, and Actions EH-1.A, EH-1.B, EH-2.A, EH-2.B, EH-2.C, EH-2.D, EH-2.E, EH-2.F, and CS-1.B.
• Impact CULT-3: Implementation of the proposed project (General Plan) would not directly or indirectly destroy a unique paleontological resource or site, or unique geologic feature. This impact would be less than significant because the potential for fossil remains of significance are unlikely in the Plan Area due to the relatively recent age of Holocene Bay mud underlying the city. Additionally, since no previous fossil finds have been made in the vicinity, and there are no known paleontological resources in Newark according to the University Of California Museum Of Paleontology Specimen Search database, paleontological potential of this area is considered low.

Project Consistency with the 2013 FEIR
A “Geotechnical Investigation,” dated October 2022, was prepared for the Project by Cornerstone Earth Group (Appendix B). This investigation evaluated physical and engineering properties of the subsurface, conducted engineering analysis to prepare recommendations for site work and grading, building construction and installation of associated improvements. The following discussion relative to the Project is based on this “Geotechnical Investigation.”

4.7(a) (Seismic Hazards) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts related to exposing people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving surface rupture along a known fault; strong seismic ground shaking; seismicrelated ground failure, including liquefaction; and landslides would be less than significant, subject to compliance with the City of Newark Building Codes and General Plan policies and actions identified under Impact GEO-1
The “Geotechnical Investigation” (Appendix B) conducted for the Project site, pursuant to Action EH-2.A of the City’s General Plan, indicates that the Project site is not located within a designated Alquist-Priolo Earthquake Fault Zone and no known surface expression of fault traces is believed to exist within the site.

However, due to the site’s location in the seismically active Bay Area region, as identified and considered in the 2013 FEIR, the site and the city would experience ground shaking. The Project is subject to construction standards established for seismic safety within the most recent California Building Code, which would minimize potential impacts resulting from ground shaking.

The Project’s geotechnical investigation encountered 1.25 to 9 feet of potentially undocumented fill overlying alluvial clays, silts, sands, and gravels on the previously developed Project site with groundwater depths approximately from 5 to 12 feet below ground surface (bgs). The geotechnical exploration concluded the primary geotechnical hazards potentially impacting the proposed development include potential for liquefaction-induced settlements and ground deformation, the presence of soft to medium stiff clays, shallow groundwater, the presence of moderately expansive soils, presence of undocumented fill, the potential for soil corrosion potential, and redevelopment considerations. The Project is located within a State-designated Liquefaction Hazard Zone. Per the investigation, liquefaction could occur on the site and result in differential City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 39
settlement of 1 to 2 2/3 inches with moderate potential for the liquified soils to vent through cracks in the surficial soil. The liquefaction hazard could significantly increase during a strong seismic event. According to the General Plan Tune Up EIR, the Project site is not within an earthquake-induced landslide hazard zone.

The Project’s geotechnical report includes detailed recommendations regarding foundation design to tolerate the potential liquefaction-induced settlement and ground deformation. This report has been reviewed and accepted by the City’s Engineering Division. Additionally, pursuant to COA GEO-1 specified below, the applicant shall provide the City with a design level geotechnical report for review and approval to ensure that the design of the proposed building foundation withstand liquefaction induced settlement and ground deformation impacts. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.7(b) (Erosion) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts related to soil erosion would be less than significant subject to General Plan goals and policies and other measures identified under Impact GEO-2.

The Project site is previously disturbed from past uses and would be redeveloped with new grading, paving, and landscaping. The Project reduces impervious surfaces by 29,474 square feet and would convert it to pervious surfaces. As such, redevelopment would decrease the storm water runoff from the site when compared to pre-development conditions. Consistent with Action CS-1.B, the City would require best management practices for soil erosion and sediment control during construction. Implementation of these requirements would serve to minimize impacts of pollutants and sediment in runoff to stormwater systems.

Ground disturbance activities on the Project site will be carried out in accordance with the City of Newark “Grading and Excavation” regulations (NMC Chapter 15.50), The City’s Public Works Department administers NMC Chapter 15.50 and has reviewed and conditionally accepted the Project’s grading and drainage plans as for compliance with NMC Chapter 15.50. As a result, soil erosion or loss of topsoil impacts because of the Project would be less than significant. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.7(c) (Geologic Stability) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts related to geologic stability would be less than significant. According to the Project’s geotechnical investigation, there is potential for liquefaction of localized sand layers to occur during a seismic event. The geotechnical investigation provides recommendations for shallow footings and ground improvement to help mitigate the seismic-induced settlement and increase bearing capacity. Additionally, the City of Newark Code would ensure that construction, grading, and any related activities meet the California Building Code standards and implement erosion control strategies. As such, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.7(d) (Expansive Soils) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts related to expansive soils would be less than significant. The Project’s geotechnical investigation (Appendix B) indicates the presence of expansive soils that generally cover the site and exhibit moderate shrink/swell potential. These changes in soil volume with changes in moisture content can cause heaving and cracking of slabs-on-grade, pavements, and structures founded on shallow foundations. The investigation provides grading and foundation recommendations to minimize potential effects of expansive soils on the Project. Therefore, the Project would not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.8(e) (Septic Tanks) No Change Relative to the 2013 FEIR: The 2013 FEIR determined there would be no impacts to septic tanks or alternative wastewater disposal systems. The Project would not include the use of septic tanks. Instead, a 6” sanitary sewer line would collect waste from the industrial facility and connect to the existing 33” sanitary sewer line in Central Avenue. Therefore, the Project would not result in any changes relative to the 2013 FEIR regarding use of septic tanks or alternative wastewater disposal systems.

4.9.(f) (Paleontological Resources) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts on unique geologic or paleontological resources would be less than significant. It is unlikely that the City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 40
project construction activities would directly or indirectly destroy a unique paleontological resource or site or unique geologic feature given the age of recent subsurface soils, lack of paleontological resource discoveries in the city and previous development and disturbance on the Project site. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR with respect to Paleontological Resources.

Conclusion and Environmental Conditions of Approval
The proposed Project is within the scope of development projected under the General Plan and would not result in any new or more severe impacts to geology and soils relative to what was identified the 2013 FEIR with implementation of the following environmental conditions of approval.

COA GEO-1 Prior to issuance of a building permit, the applicant shall prepare and submit a design-level geotechnical report to the City for review and implement the recommendations herein, as approved by the City.

4.8. GREENHOUSE GAS EMISSIONS
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Generate greenhouse gas emissions, either directly
or indirectly, that may have a significant impact on the environment?
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013; and Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the 6756 Central Avenue Warehouse Project, City of Newark, Alameda County, California, dated July 19, FirstCarbon Solutions.

General Plan EIR Findings
The 2013 FEIR evaluated the potential impacts related to greenhouse gas emissions in Chapter 4.6 and determined the following:
• Impact GHG-1: Implementation of the proposed project (General Plan) would result in greenhouse gas emissions (GHG) in excess of the long-term 2050 GHG reduction target interpolated from Executive Order S-03-05 (2025) with significant GHG emissions within the City of Newark. These emissions would exceed 4.0 MTCO2e per service population for the City for long term growth anticipated to the year 2035. These GHG emissions could not be avoided without major advancement in technological state of the art that existed in 2013 despite Uniformly Applicable Development Standards for new developments. Therefore, the impact with respect to generation of GHG emissions would be significant and unavoidable. A statement of overriding consideration was adopted with certification of the 2013 FEIR.
• Impact GHG-2: The proposed project (General Plan) would not conflict with an applicable plan, policy, or regulation for the purpose of reducing the emissions of GHGs, namely, California Air Resources Board (CARB) scoping plan, Metropolitan Transportation Commission’s (MTC’s) Plan Bay Area and the Newark Climate Action Plan. This impact is considered less than significant.

Project Consistency with the 2013 FEIR
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 41
A report titled “Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis,” dated July 19, 2024, was prepared by FirstCarbon Solutions (Appendix A). The following discussion is based on this report.

4.8(a) (Greenhouse Gas Generation) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that GHG generation for buildout of the General Plan would be significant and unavoidable without advancement in technology.

Global climate change is not confined to a particular project area and is generally accepted as the consequence of global industrialization over the last 200 years. A typical project, even a very large one, does not generate enough GHG emissions on its own to influence global climate change significantly. Therefore, the issue of global climate change is, by definition, a cumulative environmental impact. BAAQMD specifies qualitative thresholds for measuring a project’s contribution to GHG emissions during both the construction and operation phases. Both the construction and operational impacts of the Project are analyzed below relative to BAAQMD’s qualitative thresholds.

Construction
The Project’s construction emissions are specified under the assumption that construction will commence in May 2025 and conclude in February 2026. The Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis assesses that the Project’s construction emission would be less as vehicle and equipment fuel efficiencies and emission control standards continue to incrementally improve with each year. Based on analysis presented in the Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the Project, construction would generate approximately 849 metric tons of carbon dioxide equivalents (MT CO2e) should it to begin May 2025 and end in February 2025. The Project’s construction emissions are likely to decrease nominally from the aforementioned 840 metric tons of carbon dioxide equivalents (MT CO2e), if construction is rescheduled to later years.

Operation
The BAAQMD adopted qualitative thresholds to determine whether the impact from GHG would be significant.

Compliance with these thresholds would render the GHG impact of a Project less than significant.

Table 4. CEQA Thresholds of Significance for Greenhouse Gas Emissions, Adopted April 2022 Thresholds for Land Use Projects (Must Include A or B)
A. Projects must include, at a minimum, the following project design elements:

1. Buildings
a. The project will not include natural gas appliances or natural gas plumbing (in both residential and nonresidential development).
b. The project will not result in any wasteful, inefficient, or unnecessary energy usage as determined by the analysis required under CEQA Section 21100(b)(3) and Section 15126.2(b) of the State CEQA Guidelines.

2. Transportation
a. Achieve a reduction in project-generated vehicle miles traveled (VMT) below the regional average consistent with the current version of the California Climate Change Scoping Plan (currently 15 percent) or meet a locally adopted Senate Bill 743 VMT target, reflecting the recommendations provided in the Governor’s Office of Planning and Research’s Technical Advisory on Evaluating Transportation Impacts in CEQA:
i. Residential projects: 15 percent below the existing VMT per capita ii. Office projects: 15 percent below the existing VMT per employee iii. Retail projects: No net increase in existing VMT
b. Achieve compliance with off-street electric vehicle requirements in the most recently adopted version of CALGreen Tier 2.

B. Be consistent with a local GHG reduction strategy that meets the criteria under State CEQA Guidelines Section 15183.5(b).

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 42
As stated in the Project Description, The Project’s energy supply would be required to be electric with highefficiency appliances. As described in Section 4.6 Energy, the Project will not result in any wasteful, inefficient, or unnecessary energy usage. As described in Section 4.17. Transportation, the Project is within a South Planning Area Traffic Analysis Zone (TAZ) that has a VMT per capita of 14.02. The target VMT, based on the South Planning Area Average, for a less than significant VMT impact is 14.6 or below (which is 15 percent below the 17.2 VMT per employee). COA GHG-1, below, would ensure that the Project achieves compliance with off-street electric vehicle requirements in the most recently adopted version of CALGreen Tier 2.

Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.8(b) (Conflict with Plans) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that the General Plan would not conflict with California Air Resources Board (CARB) scoping plan, Metropolitan Transportation Commission’s (MTC’s) Plan Bay Area or the Newark Climate Action Plan. These plans include measures and strategies for greenhouse gas emissions reduction to meet state targets. The Project proposes development that is consistent with the development envisioned in the General Plan and is consistent with the General Plan policies, such as those related to green building and energy use, that promote a reduction in greenhouse gas emission through the application of energy efficiency standards and green building requirements under the California Building Code. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact regarding GHG relative to the 2013 FEIR.

Conclusion and Environmental Conditions of Approval
The proposed Project is within the scope of development projected under the General Plan and analyzed in the 2013 FEIR. Impacts from greenhouse gas emissions were determined to be significant and unavoidable in the 2013 FEIR and a statement of overriding considerations was adopted. The Project would include design elements that, in combination with the COA GHG-1 below, would reduce GHG emissions impacts to a less than significant impact.

COA GHG-1 The Project shall comply with the most recent CalGreen Tier 2 EV requirements for nonresidential projects and show the required number of EV spaces on the plans.

4.9. HAZARDS AND HAZARDOUS MATERIALS
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 43
would it create a significant hazard to the public or the environment?
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within
two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency
evacuation plan?
g) Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury or death involving wildland fires?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013; Phase I Environmental Site Assessment Report, prepared by Farallon Consulting, April 30, 2024; Data Gap Investigation and Site Closure, prepared by Farallon Consulting, September 13, 2023; and State Responsibility Fire Hazard Severity Zone Maps, Office of the State Fire Marshall, accessed April 2024.

General Plan EIR Findings
The 2013 FEIR evaluated potential Hazards and Human Materials impacts in Chapter 4.7 and determined the following:
• Impact HAZ-1: The implementation of the proposed project (General Plan) would not create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials. This impact is considered less than significant, subject to compliance with applicable federal, state, and local regulations. Further, implementation of the following General Plan goals, policies and actions would further minimize the risks from routine transport, use, or disposal of hazardous materials: Goal EH-4, Policies EH-4.1, EH-4.4 to EH-4.7, Actions EH-4.A, EH-4.C, EH-4.E, EH-4.G and EH-4.I.
• Impact HAZ-2: Implementation of the proposed project (General Plan) would not create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment. This impact is considered less than significant, subject to compliance with applicable federal, State, and local regulations and conditions of approval, including Mitigation Measures HAZ-1.1 through HAZ-5.1 (Newark Areas 3 and 4 Specific Plan), 4.6-1 and 4.6-2a (2010 Housing Element), and 4.7-1a through 4.7-1e (Dumbarton TOD Specific Plan). Implementation of the following General Plan goals, policies and actions would further minimize the risks to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment: Goal EH-4, Policies EH4.1 and EH-4.4, and Actions EH-4.A, EH-4.C, EH-4.E, EH-4H, EH-4.J and EH-4.K. • Impact HAZ-3: Implementation of the proposed project (General Plan) would not result in significant impacts associated with hazardous emissions or handling of hazardous or acutely hazardous materials, substances, or waste within ¼-mile of an existing or proposed school. This impact is considered less than significant, subject to implementation of applicable regulations and conditions of approval. Mitigation Measures HAZ-2.1 (Newark Areas 3 and 4 Specific Plan), 4.6-1 and 4.6-2a (2010 Housing Element), and 4.7-1a through 4.7-1e (Dumbarton TOD Specific Plan) would apply to land uses that could have the potential to result in an increased risk of release of hazardous materials.

Further, implementation of General Plan goals, policies, and actions listed under Impacts HAZ-1, HAZ2, and HAZ-4, would ensure that hazardous emissions or handling of hazardous materials, substances, or waste within ¼-mile of an existing school is minimized to the maximum extent practicable. This impact is considered less than significant.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 44
• Impact HAZ-4: Implementation of the proposed project (General Plan) would not create a significant hazard to the public or the environment as a result of development on a site that is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5. This impact is considered less than significant, subject to compliance with applicable regulation and conditions of approval, including Mitigation Measures 4.6-1 and 4.6-2a (2010 Housing Element Update), HAZ-1.1 though HAZ-5.1 (Newark Areas 3 and 4 Specific Plan), and 4.7-1a though 4.7-1e (Dumbarton TOD Specific Plan), together with implementation of General Plan goals, policies, and actions under Impacts HAZ-1 and HAZ-2, and as follows: Goal HW-5, Policies HW-5.1 to HW-5.3, and Action HW-5.A. This impact is considered less than significant.
• Impact HAZ-5: Implementation of the proposed project (General Plan) would not result in a safety hazard for people residing or working in the Plan Area due to development within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport because there are no public use airports public use airports within the Plan area with the nearest airport greater than two miles away from the City of Newark. Therefore, there would be no impact to the safety for people residing in or working in the area because of proximity to airports. • Impact HAZ-6: Implementation of the proposed project (General Plan) would not result in a safety hazard for people residing or working in the Plan Area due to development in the vicinity of a private airstrip because there are no private airstrips within or in the near vicinity of the Plan Area and there would be no impact as a result.
• Impact HAZ-7: Implementation of the proposed project (General Plan) would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan.

This impact is considered less than significant, subject to compliance with the Cal EMA (Strategic Plan 2010-2015), the City of Newark Emergency Operations Plan and the City of Newark Chemical Emergency Preparedness Plan along with the following goals, policies and actions of the General Plan: Goal EH-5, Policies EH-5.1, to EH-5.8, and Actions EH-5.A to EH-5.H. • Impact HAZ-8: Implementation of the proposed project (General Plan) would not expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands because the Plan Area is surrounded on all sides by land within the limits of the City of Fremont and is not designated as having high, very high, or extreme wildland fire threat to people, as determined by CAL FIRE's Wildlife Urban Interface Fire Threat data. Future development in the Plan Area would be constructed pursuant to the California Building Code, California Fire Code, and the City of Newark Municipal Code and the General Plan Goal EH-1, and Policies EH-1.1 and EH-1.2 would further ensure minimization of risks from wildland fires. This impact is considered less than significant. • Impact HAZ-9: Implementation of the proposed project (General Plan) in combination with past, present, and reasonably foreseeable projects, would not contribute to cumulative increase in risk to hazards or hazardous materials. This impact is considered less than significant, subject to compliance with the applicable federal, state and local regulations, conditions of approval and General Plan goals, policies and actions identified above under Impacts HAZ-1 to HAZ-8.

Project Consistency with the 2013 FEIR
A Phase I Environmental Site Assessment Report, dated April 30, 2024 (Appendix C-1), and a Media Management Plan titled “Data Gap Investigation and request for site closure”, dated September 13, 2023 (Appendix C-2), were prepared by Farallon Consulting. The following discussion relative to hazardous materials issues on the Project site is based on these reports.

4.9(a) (Routine Transport, Use or Disposal) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that compliance with applicable federal, state, and local regulations would reduce the risk to City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 45
the public or the environment because of the routine transport, use, or disposal of hazardous materials to a less than significant level.

The Project site has had a history of hazardous materials and hazardous materials contamination, investigations and remediation, as described in the Project’s Phase I Environmental Site Assessment, and is currently under a voluntary cleanup agreement with the Alameda County Water District (ACWD) related to limited chemical releases and is pursuing a regulatory case closure from the regulatory agency. The Applicant has provided ACWD, a Media Management Plan, dated 2023, which, according to the Applicant, was required by the ACWD in support of case closure. At the time of preparation of this environmental analysis, the Applicant has indicated that a Media Management Report is under final review and an approval is expected.

The Project may result in potential management of hazardous materials and would be required to comply with General Plan policies and standard regulatory measures governing their handling and treatment. Potentially hazardous building materials (e.g., asbestos containing materials, lead-based paint, etc.) could be encountered during demolition of existing structures. Additionally, subsequent Project construction activities would result in the temporary presence of potentially hazardous materials including, but not limited to, fuels, lubricants, paints, solvents, insulation, electrical wiring, and other construction related materials onsite. The Project may result in routine transport, use, or disposal of hazardous materials because of the prospective uses of the proposed building. However, compliance with applicable federal, and state laws, implementation of General Plan Policies EH-4.4 to EH-4.7, and Actions EH-4.A, EH-4.E, EH-4.G and EH-4.I and other applicable local regulations would ensure less than significant impact from routine transport, use, or disposal of hazardous materials. Moreover, the Project is sited in an area with land use and zoning designations intended to provide for industrial activities operated in accordance with General Plan policies and applicable regulations. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(b) (Upset and Accident Involving Release) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that compliance with applicable federal, state, and local regulations, applicable General Plan goals and policies, and applicable mitigation measures from previous plans as described would reduce the hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment to a less than significant level.

As it relates to the Project, General Plan Policies EH-4.4 to EH-4.7, and Actions EH-4.A, EH-4.E, EH-4.G and EH-4.I as well as Action EH-4.J are applicable to address any impact from upset and accident involving release of hazardous materials in the environment. In accordance with Action EH-4. J, a Phase I Environmental Site Assessment (ESA) (Appendix C-1), and a Media Management Plan, titled “Data Gap Investigation and request for site closure”, dated September 13, 2023, were prepared for the Project site because of the presence of hazardous materials on site because of its industrial use. The Phase I ESA was prepared in general conformance with the scope and limitations of American Society for Testing and Materials (ASTM) E1527-21 and the standards and practices of the All-Appropriate Inquiry – Final Rule (40 Code of Federal Regulations Part 312). As described above, the latter document is under review by ACWD for a case closure request. COA HAZ -1 is imposed to subject the development on the Project site to the determination on the case closure determination by the ACWD, requested by the Applicant. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(c) (Emit or Handle Hazardous Material within ¼ Mile of School Sites) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that the implementation of the General Plan would result in a less than significant impact as it relates to the release and exposure of hazardous material onto schools sites with ¼ mile of the Project site subject to implementation of the Mitigation Measures identified under Impact HAZ-3 above and implementation of General Plan goals, policies, and actions listed under Impacts HAZ-1, HAZ-2, and HAZ-4. However, there are no schools within ¼ mile of the Project site. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(d) (Existing Hazardous Materials Sites) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that implementation of the General Plan would result in less than significant impacts due to City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 46
development on a hazardous materials sites compiled pursuant to Government Code Section 65962.5 subject mitigation measures and General Plan goals, policies and actions. As described under 4.9 (a) and 4.9 (b), the Project site, which is a hazardous materials site itself, would be subject to the applicable regulations of ACWD and the San Francisco Regional Water Quality Control Board (SFRWQCB), Region 2, the responsible state and local agencies. And COA HAZ-1, below. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(e) (Public Airport Land Use Plans, Public, Public Use Airport) No Change Relative to the 2013 FEIR:

The 2013 FEIR concluded that no impacts related to airports or airstrips would occur as no airports are located within or proximate to the Plan area. The subject Project site is not located within the boundaries of an airport land use plan, public or public use airport nor is it located in direct proximity to a private airstrip. The nearest airport, Hayward Executive Airport, is located approximately 11 miles to the north of the Project site. Other area airports include, Palo Alto Airport, which is located approximately 13 miles west of the Project site and Norman Y. Mineta San Jose International Airport, which is located further away at approximately 16 miles to the south of the Project site. Accordingly, no impacts associated with airport-related hazards will result from the Project. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(f) (Impair Emergency Response Plan) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that the General Plan would not impair implementation of or physically interfere with the City’s emergency response plan or emergency evacuation plan and impacts would be less than significant subject to compliance with applicable regulations, conditions of approval and the applicable General Plan goal, policies and actions identified above under Impact HAZ-7.

The City of Newark has adopted two emergency response plans. The "Emergency Operations Plan” is the City’s primary plan which provides operational procedures for responding to a variety of emergency conditions, including earthquakes, flooding, tsunamis, hazardous material incidents, and civil defense conditions. The guidelines included in this plan address the needs of the entire community and identify key responsible agencies and personnel. The “Chemical Emergency Preparedness Supporting Plan” is the City’s second response plan, which establishes standard operating procedures for responding to a chemical spill or hazardous materials incidents within the City.

As an industrial development consistent with the General Plan and applicable policies, the proposed Project improvements are not expected to impair the implementation of or physically interfere with the aforementioned plans. The Project is not altering the existing road network and includes adequate onsite access to accommodate emergency vehicles, including adequate driveway/drive aisle width and turning radii that have been reviewed and approved by the Alameda County Fire Department Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(g) (Wildland Fire Hazards) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that the General Plan would not result in impacts related to wildland fire hazard because of the highly urbanized nature of the Plan area and vicinity. Further, the General Plan goal and policies as identified under Impact HAZ-8 that pertain to compliance with development and code requirements and location of projects would ensure that the impacts are less than significant.

The Project area is largely surrounded by urban development and roadways and is not adjacent to a wildland urban interface fire hazard area. The Project site is not in an area categorized as any of the Fire Hazard Severity Zones by CAL FIRE and is surrounded by land also not included in any Fire Hazard Severity Zones.

The Project development would also be subject to the California Building Code, California Fire Code, and the City of Newark Municipal Code and the Project site is proximate to an existing fire station, which is located approximately one mile away from the Project site. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion and Environmental Conditions of Approval
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 47
The Project would not result in any new or more severe impacts to human health caused by hazards or hazardous materials relative to what was identified the 2013 FEIR subject to implementation of applicable regulations, conditions of approval, and General Plan policies and actions. The Project is generally consistent with the General Plan by introducing industrial development on a site designated for such use. The following environmental conditions of approval are imposed in compliance with the General Plan goals, policies and actions regarding hazardous materials and waste.

COA HAZ-1: Prior to issuance of any demolition permit, the applicant/project developer shall provide the City of Newark with evidence of approval by the ACWD of the Media Management Plan, titled “Data Gap Investigation and request for site closure”, dated September 13, 2023, prepared by Farallon Consulting and case closure.

4.10. HYDROLOGY AND WATER QUALITY
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Violate any water quality standards or waste
discharge requirements or otherwise substantially
degrade surface or groundwater quality?
b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge such
that the project may impede sustainable groundwater
management of the basin?
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of
impervious surfaces, in a manner which would:
i) result in substantial erosion or siltation on- or off-site; ii) substantially increase the rate or amount of surface runoff in a manner which would result in flooding onor offsite; iii) create or contribute runoff water which would
exceed the capacity of existing or planned stormwater
drainage systems or provide substantial additional
sources of polluted runoff; or
iv) impede or redirect flood flows?
d) In flood hazard, tsunami, or seiche zones, risk
release of pollutants due to project inundation?
e) Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater
management plan?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013; FEMA FIRMette maps, accessed April 2024; Department of Conservation Tsunami Hazard Area Map, accessed April 2024; and National Oceanic and Atmospheric Administration (NOAA) Office of Coastal Management, Sea Level Rise Viewer, accessed April 2024.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 48
General Plan EIR Findings
The 2013 FEIR evaluated the potential impacts related to hydrology and water quality in Chapter 4.8 and determined the following.
• Impact HYD-1: Implementation of the proposed project (General Plan), would not violate any water quality standards or waste discharge requirements subject to compliance with the C.3 provisions set by the SFRWQCB, preparation of a Stormwater Management Plan (SWMP), implementation of stormwater management measures, preparation of an Operations and Maintenance (O&M) Plan for post-construction water quality. and implementation of the General Plan goals and policies as follows:

Policies CS-3.1, CS-3.4, CS-3.5, CS-3.8, and Actions CS-1.B, CS-3.G and CS-3.H. This impact is considered less than significant.
• Impact HYD-2: Implementation of the proposed project (General Plan) would not substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level subject to required compliance with ACWD’s Well Ordinance (Ordinance No. 2010-01), coordination with the ACWD and SFRWQCB on a former Leaking Underground Fuel Tank (LUFT) site or Site Cleanup Program (SCP) site, C.3 provisions of the Alameda County Clean Water Program, the implementation of water use efficiency measures, and the following General Plan goals and policies: Policies CS-3.1, CS-3.3, CS6.5 and Actions CS-3.A and CS-3.C. • Impact HYD-3: Implementation of the proposed project (General Plan) would not substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion, siltation, or flooding on- or off-site subject to post construction storm water management measure pursuant to C.3 provisions of the Alameda County Clean Water Program and implementation of the following General Plan policies and actions: Policies CS-5.4 to CS-5.8, and Actions CS-5.D and CS-5.E. This impact is considered to be less than significant.
• Impact HYD-4: Implementation of the proposed project (General Plan) would not create or contribute runoff water, which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff with the implementation of C.3 provisions for new development, development impact fees that would require developers to pay a fair share of improvements to the storm drain system necessary to accommodate increased flows from the development, and the implementation of General Plan goals and policies as follows: Policies CS-5.5 to CS-5.8, and Actions EH-3.D, EH-3.E and CS-5.E. This impact is considered to be less than significant.
• Impact HYD-5: Implementation of the proposed project (General Plan) would not otherwise substantially degrade water quality with implementation of the applicable regulations, namely, C.3 provisions of the Alameda County Clean Water Program and the City of Newark Municipal Code (NMC), Chapter 8.36 Stormwater Management and Discharge Control. This impact is considered to be less than significant.
• Impact HYD-6: Implementation of the proposed project (General Plan) would not result in a significant impact with respect to the placement of housing or structures, which would impede or redirect flood flows within a 100-year flood hazard area as mapped on a Federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map subject to applicable regulations, namely the FEMA Regulations in floodplains – LOMR-Fill Determination Requirements and NMC Chapter

15.40 Construction in Flood Hazard Areas as well as implementation of General Plan policies and actions as follows: Policies EH-3.3 to EH-3.5, EH-3.7 and EH-3.8, and Actions EH-3.A, EH-3.B, EH3.C and EH-3.E. This impact is considered less than significant. • Impact HYD-7: Implementation of the proposed project (General Plan) would not expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 49
of the failure of a levee or dam subject to compliance with applicable regulations, namely, the FEMA – Levee Certification, California Division of Safety of Dams Regulations – California Water Code – Supervision of Dams and Reservoirs, and Association of Bay Area Government’s (ABAG) MultiJurisdictional Local Hazard Mitigation Plan together with the implementation of General Plan Goals EH-3, EH-5, Policy EH-3.6, and Actions EH-5.G and EH-5.H. This impact is considered to be less than significant.
• Impact HYD-8: Implementation of the proposed project (General Plan) would not result in significant adverse effects related to inundation by seiche, tsunami, or mudflow. The City of Newark is not considered to be subject to significant risk from tsunamis, seiches, or mudflows. Implementation of the following General Plan policies and actions would further reduce the risks: Goal EH-5, Policies EH3.9, CS-5.8, EH-5.2 to EH-5.5 and Actions EH-5.A, EH-5.B, EH-5.C, EH-5.D, EH-5.E, EH-5.F, EH5.G. This impact is considered to be less than significant. • Impact HYD-9: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable development, would not result in a significant cumulative impact with respect to hydrology and water quality subject to compliance with applicable regulations, namely, the NPDES General Construction Permit, Alameda County Clean Water Program, NMC Chapter 8.36 Stormwater Management and Discharge Control and Chapter 15.40 Construction in Flood Hazard Zones together with General Plan Policies CSF-5.4, CSF-5.7 and Action CSF-5.E. The cumulative impact with respect to hydrology and water quality is considered to be less than significant.

Stormwater Regulations
The State Water Resources Control Board is responsible for implementing the Clean Water Act and has issued a statewide General Permit for construction, which acts to minimize pollutant runoff to surface waters and groundwater. The SFBRWQC board is the regional entity facilitating regional implementation and has issued an NPDES permit to Alameda County and its cities. The NPDES permit applies to development projects and establishes runoff requirements. The City’s coverage under the NPDES requires compliance with the Alameda Costa Clean Water Program Stormwater C.3 Guidebook to protect water quality, which includes implementing best management practices (BMP) to control runoff pollutants and guidance on Low Impact Development (LID) to manage stormwater on site. Further, these requirements for stormwater control under the NPDES permit are integrated into the City of Newark Municipal Code. The City of Newark Public Works Department has jurisdiction over stormwater management in the City and is a co-permittee of the Alameda County Clean Water Program.

Project Consistency with the 2013 FEIR

4.9(a) (Discharge) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that the implementation of the General Plan would have a less than significant impact subject to the measures identified under Impact HYD-1 above. Accordingly, the Project is required to comply with the applicable requirements for stormwater control and apply best management practices to the management of stormwater on the Project site, including the stormwater regulations described above. The applicant submitted a “Conceptual Stormwater Quality Control Plan,” dated March 27, 2024, prepared by Kier+Wright, which has been reviewed and accepted by the City’s Public Works Department. For final approval. the Public Works Department has required that, prior to grading permit issuance, the applicant provide necessary plans, details, and calculations that demonstrate that the plan complies with the applicable Municipal Regional Stormwater NPDES Permit (MRP), as reproduced in COA HYD-1 below. Additionally, COA HYD-2 requires preparation of an Operations and Maintenance (O&M) Plan/Stormwater Treatment Measures Maintenance Agreement for post-construction water quality. With these measures the Project will be in conformance with the General Plan policies and actions applicable to the Project. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(b) (Groundwater) No Change Relative to the 2013 FEIR: Based on the analysis in the 2013 FEIR, the Project would not substantially deplete groundwater supplies with implementation of applicable regulations such as the Alameda County Water District’s Well Ordinance and C.3 provisions of the Alameda County Clean City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 50
Water Program. The Project would be required to comply with these requirements. The Project does not involve the extraction and use of groundwater for its operation on the site. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(c)(i-iv) (Drainage Pattern) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that the implementation of the General Plan would not substantially alter the drainage patterns and erosion and siltation impacts would be less than significant, subject to implementation of applicable C.3 provisions of the Alameda County Clean Water Program and General Plan policies as identified above under Impact HYD-3. The 2013 FEIR also determined that developments constructed under the purview of the General Plan would be subject to development impact fees that would require developers to pay a fair share of improvements to the storm drain system necessary to accommodate increased flows from the development.

Additionally, the City of Newark has adopted standards of construction in flood hazard zones and projects in flood zones are reviewed by the Newark Public Works Department - Engineering Division in coordination with Alameda County Flood Control District (ACFCD) with detailed review of improvement plans to ensure that flood flows are addressed.

The Project would be subject to and required to comply with all applicable regulations including C.3 provisions of the Alameda County Clean Water Program and the City’s Municipal Code that would reduce Project-specific impacts to a less than significant level. With respect to the capacity of the City’s stormwater system, Newark is served by an existing storm drain system. As per the City Engineering Division, the Project would not result in inadequate capacity for stormwater discharges from the Project. Further, the City has established development impact fees for new developments to contribute to any needed new or expanded infrastructure.

Payment of development impact fees is payable during the building permit process and final drainage plans are reviewed during the improvements plans review process. Development impacts fees are used to maintain and expand the City storm drain system as warranted. The Project is consistent with the development potential analyzed in the 2013 FEIR, including storm drain infrastructure onsite with connections to the existing drain system, and is subject to impact fees.

4.9(d) (Flood Hazard, Tsunami, or Seiche Zones) No Substantial Change Relative to the 2013 FEIR: The Project site is located in an area of minimal flood hazard as presented in the National Flood Hazard Layer FIRMette maps accessed from the Federal Emergency Management Agency (FEMA) in April 2024. Therefore, the risk of the release of pollutants due to project inundation would be less than significant with implementation of COA HYD-2. The Project site is not located on the shoreline and is not subject to associated risk of flooding in these areas. The Project site is not located in an area identified as a shoreline area vulnerable to sea level rise as per the National Oceanic and Atmospheric Administration (NOAA) Office of Coastal Management data on sea level rise (Sea Level Rise Viewer), accessed April 2024. Tsunamis and seiches are not identified as significant flood hazards that may affect the Project as the Project site is located more than 2.6 miles from the shoreline. The site is not located in a tsunami hazard area, as shown in the California Department of Conservation Tsunami Hazard Area Map, accessed April 2024. As a result, there would be no substantial risk of flood hazards, tsunamis, or seiches causing release of pollutants due to Project inundation. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.9(e) (Water Quality Control and Sustainable Groundwater) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that new development would be required to adhere to applicable regulations, namely the Alameda County Clean Water Program – C.3 Provisions and NMC, Chapter 8.36 Stormwater Management and Discharge.

The Project would be required to include source control, site design, and LID measures in compliance with the C.3 measures and comply with applicable requirements of the NMC. It would thus not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion and Environmental Conditions of Approval
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 51
The proposed Project is within the scope of development projected under the General Plan and there would be no additional impacts to hydrology beyond those analyzed in the 2013 FEIR. The following environmental conditions of approval would apply to the Project.

COA HYD-1: Preliminary Stormwater Treatment Plan is approved in concept only. Final approval is subject to the applicant providing, prior to the issuance of the grading permit, the necessary plans, details, and calculations that demonstrate the plan complies with the Municipal Regional Stormwater NPDES Permit (MRP), Order R2-2022-0018, revised July 1, 2022, issued to the City of Newark by the Regional Water Quality Control Board, San Francisco Bay Region.

COA HYD-2: Prior to issuance of a building permit, the applicant shall prepare an Operations and Maintenance (O&M) Plan for post-construction water quality. The O&M Plan shall be reviewed and accepted by the City Engineer prior to Project Construction on the site.

4.11.LAND USE AND PLANNING
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Physically divide an established community?
b) Cause a significant environmental impact due to a
conflict with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating an
environmental effect?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to Land Use in Chapter 4.9 and determined the following:
• Impact LU-1: Implementation of the proposed project (General Plan) would not physically divide an established community subject to compliance with the applicable provisions of the NMC, namely, Title 16, Subdivision Ordinance and Title 17, Zoning Code, together with implementation of General Plan policies and actions intended to foster greater connectivity in the Plan Area and to prevent new development from dividing existing communities, as follows: Policies LU-2.6, LU-4.2, LU-2.5, T-1.4, T2.3, T-2.5, T-2.12, T-2.10, T-2.2, T-2.9, and Actions T-2.B, T-2.G and T-2.H. This impact is considered less than significant.
• Impact LU-2: Implementation of the proposed project (General Plan) would not conflict with an applicable land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. This impact is considered less than significant, subject to implementation of General Plan Actions LU-6.A, LU-7.B and LU-7.E that are applicable to the Dumbarton TOD Specific Plan Implementation and Southwest Newark Residential and Recreational Focus Area. • Impact LU-3: Implementation of the proposed project (General Plan) would not result in significant conflicts with the Bay Plan and the Don Edwards San Francisco Bay National Wildlife Refuge Comprehensive Conservation Plan (CCP). Numerous General Plan policies and actions are consistent with the objectives of the Bay Plan, including Policies CS-1.1 to CS-3.1, CS-2.1 and CS-3.1, and Actions CS-2.A, CS-3.G and CS-3.H. Implementation of General Plan policies and actions as follows would minimize disturbances and support the goals of the CCP: Policies CS-1.1 to 1.3, CS-1.5: CS- City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 52

2.1 to CS-2.3, CS-2.7, CS-3.4 and CS-3.5, Actions LU-7.A, CS-1.A, CS-1.C, CS-2.A, CS-2.D, CS-2.E, CS-3.H, POS-1.A and POS-1.B.
• Impact LU-4: When considered in combination with past, present, and reasonably foreseeable development in the surrounding area, implementation of the proposed project would not result in significant cumulative impacts with respect to land use and planning. The proposed project would have a less than cumulatively considerable contribution to this impact.

Project Consistency with the 2013 FEIR

4.1(a) (Physically Divide Community) No Change Relative to the 2013 FEIR: The Project is consistent with General Industrial land use and GI zoning designation that are applicable to the Project site as outlined in the General Plan and Newark Municipal Code, respectively. Development on this site would not disrupt the established physical layout of the existing community with new roads, above ground infrastructure or easements running offsite through the existing development in the vicinity. The Project would conform to the provisions of the NMC including development standards such as setbacks and height. The Project would be consistent with applicable General Plan Policy LU-2.6 regarding scale transition in that there would not be an abrupt transition in height between the development proposed by the Project and development in the vicinity.

Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.1(b) (Conflict with Land Use) No Substantial Change Relative to the 2013 FEIR: The Project site is not within the Dumbarton TOD or Southwest Newark Residential and Recreational Focus Area; therefore, the General Plan actions outlined in LU-2 above do not apply to the Project. The Project proposes a use consistent with the General Industrial land use designation for the site. The Project would comply with the applicable provisions of the City’s Zoning Code. As such, the Project would not result in any significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. Therefore, it would not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion
The Project would not result in any new or more severe impacts relative to land use than those identified in the 2013 FEIR. The Project consists of development consistent with the land use and zoning code as provided.

No environmental conditions of approval related to land use are required.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 53

4.12. MINERAL RESOURCES
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the
residents of the state?
b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local
general plan, specific plan or other land use plan?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR describes that there are no mineral recovery sites in Newark and while the State Board of Mining and Geology has identified mineral resource zones (MRZ) underlying almost all of the Plan Area, given the extent of urban development in Newark and the proximity of sensitive environmental resources in the Don Edwards San Francisco Bay National Wildlife Refuge, future mineral extraction is unlikely, and an area that was previously designated as containing extractable aggregate deposits is no longer considered to be underlain by aggregate resources per Update of Mineral Land Classification: Aggregate Materials in the South San Francisco Bay Production-Consumption Region (1996). As such, impacts related to the loss of mineral resource availability from the implementation of the project (General Plan) would be less than significant.

Project Consistency with the 2013 FEIR

4.12(a-b) (Mineral Resources) No Change Relative to the 2013 FEIR: The City does not contain known significant mineral resources of value or any mineral recovery sites. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion
The Project would not result in any new or more severe impacts to mineral resources relative to what was identified in the 2013 FEIR.

4.13.NOISE
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable
standards of other agencies?
b) Generation of excessive groundborne vibration or
groundborne noise levels?
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 54
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a
plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to
excessive noise levels?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013; and Acoustical Assessment, prepared by Kimley‐Horn and Associates, Inc., December 2023.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to Noise in Chapter 4.10 and determined the following:
• Impact NOI-1: Implementation of the proposed project (General Plan) would not expose people to or generate noise levels in excess of standards established in the General Plan or the NMC and/or the applicable standards of other agencies. This impact is considered less than significant, subject to compliance with the California Building Code and Newark Land Use Noise Compatibility Guidelines and the implementation of General Plan Policy EH-7.4, Action EH-7.A as it pertains to interior noise, and Actions EH-6.A and EH-7.A as it pertains to exterior noise. • Impact NOI-2: Implementation of the proposed project (General Plan) would not expose people to or generate excessive groundborne vibration or groundborne noise levels. This impact is considered less than significant, subject to compliance with the California Building Code and Newark Land Use Noise Compatibility Guidelines and the implementation of General Plan policies and actions for nonresidential uses as follows: Policies LU-2.5, LU-3.5, EH-6.4, EH-7.3, EH-7.6, and Actions EH-6.6, EH6.7, EH-7.B, EH-7.C, EH-7.D, EH7.E, EH7.F, EH-6.B, LU-2.A.. • Impact NOI-3: Implementation of the proposed project (General Plan) would result in a substantial permanent increase in ambient noise levels in the Plan Area above levels existing without the project with increases in vehicular traffic because of the project implementation in conjunction with regional growth. The permanent increases to ambient noise levels would exceed applicable standards along ten major roadway segments in the Plan Area. Implementation of the applicable goals, policies and actions of the General Plan would reduce or prevent significant increases in ambient noise at sensitive land uses under implementation of the project. However, the mitigation measures described in these policies would not be universally feasible and/or appropriate. No additional measures are available to reduce this impact to a less than significant level and related impacts would be significant and unavoidable. A statement of overriding consideration was adopted with the certification of the 2013 FEIR.
• Impact NOI 4: Implementation of the proposed project (General Plan) would not result in substantial temporary or periodic increases in ambient noise levels in the Plan Area above existing levels subject to compliance with the California Building Code and Newark Land Use Noise Compatibility Guidelines, and the implementation of General Plan Policies EH-6.6, EH-6.7, and Action EH-7.B. This impact is considered less than significant.
• Impact NOI-5: Implementation of the proposed project (General Plan) would not result in exposure of people residing or working in the vicinity of the Plan area to excessive aircraft noise levels, for a project located within an airport land use plan, or where such a plan has not been adopted, within 2 miles of a public airport or public use airport because there are no areas in Newark which fall within an airport land use plan or 55 (decibels) dBA contour for any of the airports located in proximity to the city and all public and public use airports in the vicinity are located a distance of 5 miles or greater. This impact is considered to be less than significant.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 55
• Impact NOI-6: Implementation of the proposed project (General Plan) would not result in exposure of people residing or working in the project area to excessive noise levels, for a project within the vicinity of a private airstrip because there are no private airstrips within Newark and heliports operated by First Interstate Bank and Washington Hospital in Fremont are located at a distance of 1.7 and 2.2 miles, respectively, from the City of Newark border and used sporadically. Therefore, noise impact related to private airstrips would be less than significant.

Project Consistency with the 2013 FEIR
An “Acoustical Assessment”, December 2023., (Appendix D-1), and a “General Plan Noise Policy Consistency Analysis”, March 2023 (Appendix D-2), were prepared by Kimley‐Horn and Associates, Inc that evaluated the potential construction and operational noise and vibration levels associated with the Project and determined the level of impact the Project would have on the environment. The assessment also analyzed the vibration impacts of the way traffic on the Union Pacifica Railroad adjacent to the Project. The following discussion relative to the Project is based on these reports.

4.13(a) (Increase in Ambient Noise) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that implementation of the General Plan would have a less than significant impact related to temporary or permanent increases in ambient noise levels subject to compliance with the California Building Code and Newark Land Use Noise Compatibility Guidelines with implementation of General Plan policies and actions as identified above under Impact NOI-1.

The Project would entail the demolition of the existing buildings, grading/site preparation work and the construction of one 315,390 square foot industrial facility and associated improvements on the Project site surrounded by other industrial uses. As indicated in the Project’s “Acoustical Assessment,” both construction activity for the Project and its operation would generate new sources of noise from the Project.

Construction
Construction activities associated with development of the Project would include demolition, site preparation, grading, paving, building construction, and architectural coating. Such activities may require dozers and tractors during site preparation; heavy‐duty trucks, backhoes, bulldozers, excavators, front‐end loaders, and scrapers during grading and excavation; cranes, forklifts, generators, tractors, and welders during building construction; pavers, rollers, mixers, tractors, and paving equipment during paving; and air compressors during architectural coating. Construction noise would vary depending on the type of equipment being used, location, and stage of the construction process.

The Project’s “Acoustical Assessment” indicates grading and excavation to be the shortest phases in the construction process but those that tend to be the loudest because of the operating cycles of the construction equipment used in grading and excavation. These operating cycles may involve one or two minutes of full power operation followed by three to four minutes at low settings. The other primary sources of construction noise would include activity such as placement of large pieces of equipment or the hydraulic movement of machinery lifts. These would be shorter‐duration incidents, which would last less than one minute. According to the applicant, no pile‐driving activities are proposed for the Project.

While the City of Newark General Plan has not adopted a quantitative construction noise threshold, the Newark Municipal Code (NMC) limits construction equipment noise levels to 86 dBA at the property line and 83 dBA at 25 feet from the source for individual pieces of equipment. The closest noise sensitive receptor is identified as a residential neighborhood located at approximately 670 feet to the northeast of the Project site. The loudest piece of equipment used during the construction process is projected to generate 65 dBA at 670 feet at the site of the residential neighborhood without accounting for the nearby multi‐story industrial buildings, multi‐ story commercial buildings, and trees located north and west of the Project site. With these features taken into consideration, noise levels at the residential neighborhood, 670 feet away from the Project site, would be less than 65 dBA, which is below the normally acceptable noise levels for typical sensitive receptors i.e., residences and churches. At the closest industrial use, located 40 feet northwest from the edge of the Project site, the City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 56
loudest piece of equipment would produce a noise level of 90 dBA without accounting for any noise attenuation from nearby buildings or structures.

The aforementioned noise scenarios represent the worst‐case because construction activities would typically be spread throughout the Project site, placing some equipment farther away from the affected receptors.

Additionally, overall construction noise levels would be intermittent and fluctuate over time due to the variability of construction activities and equipment. COA NOI-1 will be implemented to regulate hours of construction and to address construction noise sources, in accordance with the General Plan Action EH-6.6 and Action EH-6.7, and restrictions of the City’s Municipal Code including NMC Section 17.24.100(A)(2) that sets limits on noise from mechanical equipment in accordance with the
Furthermore, the City of Newark commonly places a condition of approval requiring a construction noise management plan on projects. The Project’s “Acoustical Assessment” proposes a Construction Management Plan that is expected to reduce noise levels by 20 to 30 decibels, keeping construction noise levels below the 45 dBA interior noise standard at the closest residence and church and 70 dBA at the closest industrial receptor, 74 dBA at 25 feet from the loudest piece of equipment at 25 feet from the Project site and noise levels at any property line would not exceed 86 dBA. These noise levels are consistent with Newark’s land-use compatibility guidelines. COA NOI-2 requires the implementation of the Construction Management Plan during Project construction, which shall be prepared by the applicant and submitted to the City for review and approval by the City’s Building Department as part of the building permit process. With implementation of the Construction Management Plan the project would be in compliance with the City routinely applied development standards associated with managing construction noise and the project would not result in new or more severe impacts to noise relative to the 2013 FEIR.

Construction Traffic Noise
Large trucks would be necessary to deliver building materials as well as remove dump materials. The movement of such traffic to and from the site would generate an increase in noise levels. As described in the Project’s “Acoustical Assessment” a traffic noise level increase of less than 3 dBA is barely perceptible to people a doubling of traffic volume above the exiting traffic would be required to generate perceptible increase in noise levels (3dBA or more). However, the Project’s construction related traffic would not double the traffic volume in the vicinity. Therefore, the increase in noise level from Project’s construction related traffic would not be noticeable and would not generate traffic noise above the 83 dBA construction noise threshold outlined in the Newark Municipal Code.

Operational Noise
The Project’s operations would create new sources of noise consisting of off‐site traffic, mechanical equipment (i.e., trash compactors, air conditioners, etc.), delivery trucks on the Project site, and approaching and leaving the loading areas, activities at the loading areas (i.e., maneuvering and idling trucks, loading/unloading, and equipment noise), parking areas (i.e., car door slamming, car radios, engine start‐up, and car pass‐by), and landscape maintenance activities.

Table 9 of the Project’s “Acoustical Assessment” (Appendix D-1) shows the increase in noise levels due to the Project traffic above what is existing. As shown in this table, off-site traffic noise level increase due to the Project’s operations would be less than 3 dBA, which would not be perceivable. The “Acoustical Assessment” also concluded that mechanical equipment would generate a noise level of 52 dBA at 75 feet from the Project’s property line that is below the 70 dBA threshold per NMC. Mechanical equipment noise levels are projected to reach a maximum of 33 dBA (with intermittent operation) at 670 feet from the Project site to the nearest residences that is below the 55 dBA noise level, which is the normally acceptable noise threshold for residential neighborhoods per the NMC.

Noise generated from the Project’s loading area, parking lots, and landscape maintenance would not exceed Newark’s 70 dBA municipal code standard. Loading area noise, generated by heavy truck movement and engine idling, is expected to reach 67 dBA at the closet property line. This noise level is further reduced to 42 dBA at the nearest residential receptor with distance and attenuated features. Parking area noise is expected City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 57
from the slamming of car doors, conversations, and engine start up. The Project’s Acoustical Assessment concluded noise levels are not projected to exceed 68 dBA as measured from the property line and 40 dBA at the closest residential receptor, both below the City’s noise level thresholds. Landscape maintenance equipment would operate during daytime hours and would not permanently impact ambient noise levels.

Landscape related noise is projected to reach 63 dBA at the property line and 20 dBA at the nearest residential receptor that is below the acceptable noise levels as per NMC.

Although the effect of ambient noise on the Project is not considered an environmental impact under CEQA, General Plan Action EH-7.7 requires the preparation of an acoustical study for new developments in areas where the noise levels exceed the ‘normally acceptable’ levels for the proposed land use, as set forth in the General Plan. The “Acoustical Assessment,” December 2023, prepared by Kimley‐Horn and Associates, Inc. indicates that the Project is located in an area where the noise levels do not exceed the normally acceptable levels of 75 dB or less as set forth for industrial uses. Therefore, the Project will not result in conflict with General Plan Action EH-7.7.

4.13(b) (Groundborne Vibration) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts from groundborne vibrations would be less than significant subject to compliance with the California Building Code and Newark Land Use Noise Compatibility Guidelines with implementation of General Plan policies and actions as identified above under “General Plan EIR Findings”, Impact NOI-2.

Groundborne vibration because of the Project would be attributable to temporary construction related activities.

Ground‐borne vibration generated by construction equipment spreads through the ground and diminishes in magnitude with increases in distance. The intensity of such vibrations would also vary depending on the type of construction equipment used and their operation. As described in the Project’s “Acoustical Assessment (Appendix D-1), the Project construction would occur approximately 165 feet from the nearest off‐site use, the industrial building located to the northeast. At 165 feet from the Project construction activity, the vibration velocities from typical heavy construction equipment operations that would be used during project construction would range from 0.0002 to 0.0052 in/sec PPV. These values are well within the vibration threshold of 0.2 in/sec ppv specified by the Federal Transit Administration for avoidance of architectural damage. The Project site is located near a railroad; however, the Project’s operations would not involve the use of railroads. The Project operations would also not involve substantially heavy truck operations that would create significant groundborne vibration.

General Plan Action EH-7.E requires a vibration assessment for projects within 200 feet of a railroad. The closest railway to the Project site is 10 feet from the southwest property line and approximately 60 feet from the proposed building. As discussed in the Project’s “Acoustical Assessment,” industrial uses are not considered vibration sensitive, nonetheless vibration at the building would be below the building damage threshold of 100 VdB as defined in the FTA Transit Noise and Vibration Impact Assessment Manual.

Additionally, due to the distance, future receptors inside the proposed industrial building also would not experience vibration levels exceeding the annoyance level threshold of 85 VdB. Therefore, the proposed project would not result in a conflict with General Plan Action EH-7.E.

4.13(c) (Airfield Noise) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that noise impacts due to the proximity of the Project site to an airfield would be less than significant. The City is not located within the vicinity of a private airstrip or an airport land use plan, nor is it within two miles of a public airport or public use airport. As indicated in Chapter 4.9 of this document, the nearest airport, Hayward Executive Airport, is located approximately 11 miles to the north of the Project site. Other area airports include, Palo Alto Airport, which is located approximately 7 miles west of the Project site and Norman Y. Mineta San Jose International Airport, which is located further away at approximately 12 miles to the southeast of the Project site. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion and Environmental Conditions of Approval
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 58
The Project would not result in any new or more severe impacts to noise relative to what was identified in the 2013 FEIR with the implementation of the following conditions of approval:

COA NOI-1: The Applicant/Project Contractor shall implement the following noise reduction measures to minimize the impact of construction noise onto offsite receivers and demonstrate compliance to the satisfaction of the City of Newark Director of Public Works or City Engineer:

1. Construct solid plywood fences around ground level construction sites adjacent to the project property line, resulting in a decibel reduction of 5‐15 dBA.

2. ii. Equip all internal combustion engine‐driven equipment with intake and exhaust mufflers that are in good condition and appropriate for the equipment. This would provide at least a 10 dBA reduction to individual equipment noise.

3. Prohibit unnecessary idling of internal combustion engines.

4. Locate stationary noise‐generating equipment such as air compressors or portable power generators as far as possible from the project property line. Construct temporary noise barriers to screen stationary noise‐generating equipment at the project property line.

5. Utilize “quiet” air compressors and other stationary noise sources where technology exists.

6. Control noise from construction workers’ radios to a point where they are not audible at existing residences bordering the Project site.

7. Notify all adjacent businesses, residences, and other noise‐sensitive land uses of the construction schedule, in writing, and provide a written schedule of “noisy” construction activities to the adjacent land uses and nearby residences.

8. If complaints are received or excessive noise levels cannot be reduced using the measures above, erect a temporary noise control blanket barrier along surrounding building facades that face the construction sites.

9. Designate a “disturbance coordinator” who shall be responsible for responding to any complaints about construction noise. The disturbance coordinator shall determine the cause of the noise complaint (e.g., bad muffler, etc.) and shall require that reasonable measures be implemented to correct the problem. Conspicuously post a telephone number for the disturbance coordinator at the construction site and include it in the notice sent to neighbors regarding the construction schedule.

COA NOI-2 Prior to issuance of a demolition permit or improvements plans, the Applicant shall prepare and submit the Construction Management plan to the City’s Building Department for review and shall make any modifications to the Plan for Building to find it acceptable. The Applicant/Project’s Contractor shall implement the Project’s Construction Management Plan included in the “Acoustical Assessment”, prepared for the Project by Kimley‐Horn and Associates, Inc., December 2023. .

4.14.POPULATION AND HOUSING
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Induce substantial unplanned population growth in
an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example,
through extension of roads or other infrastructure)?
b) Displace substantial numbers of existing people or
housing, necessitating the construction of
replacement housing elsewhere?
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 59
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to Population and Housing in Chapter 4.11 and determined the following:
• Impact POP-1: Implementation of the proposed project (General Plan) would not induce substantial unplanned population growth in the Plan Area either directly or indirectly, subject to the implementation of Mitigation Measure 4.9-1 from the Newark Housing Element EIR and General Plan Policies LU-1.2 and LU-1.4. This impact is considered less than significant. • Impact POP-2: Implementation of the proposed project (General Plan) would not displace substantial numbers of existing housing units, necessitating the construction of replacement housing elsewhere, subject to implementation of the General Plan Policies LU-1.2, LU-1.8 and LU-1.10. This impact is considered less than significant.
• Impact POP-3: Implementation of the proposed project (General Plan) would not displace substantial numbers of people, necessitating the construction of replacement housing elsewhere, subject to implementation of General Plan Policy LU-1.8 and the development of new housing units as per the General Plan. This impact is considered less than significant. • Impact POP-4: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable projects, would not result in significant cumulative impacts with respect to population and housing as buildout of the project would be consistent with regional planning initiatives, and occur incrementally over a period of 20 years and would not represent substantial, unplanned growth even though and the project could result in more growth than currently envisioned in regional projections. This impact is less than cumulatively considerable.

Project Consistency with the 2013 FEIR

4.14(a) (Induced Substantial Unplanned Population Growth). No Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts from induced substantial growth would be less than significant with the implementation of policies identified under Impact POP-1. The Project would facilitate infill development of an Industrial facility that may lead to a minor increase in population because of the potential influx of employees and their families into the city. However, the Project site has been previously developed with industrial use and the proposed development is consistent with the General Industrial land use designation that was planned for in the General Plan. According to the General Plan, vacant industrial sites are part of the most substantial development opportunities in the city. Additionally, the Project site is served by existing infrastructure within an established urban environment. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR with respect to substantial unplanned population growth. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

4.14(b) (Displacement and Replacement Housing). No Change Relative to the 2013 FEIR: The 2013 FEIR determined that impacts from displacement of people that could necessitate construction of replacement housing elsewhere would be less than significant with the implementation of policies identified under Impact POP-2, and Impact POP-3. Consistent with these policies, the General Plan has designated areas for the development of housing in the city, with the intent to increase the amount and variety of housing opportunities.

The Project involves the development of an industrial facility and associated office space within an area currently developed and designated for such use; the Project site does not propose demolition of housing because the site does not contain any housing, and would, thus, not result in displacement of people that could necessitate construction of replacement housing elsewhere. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR in this regard.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 60
Conclusion
The Project would not result in any new or more severe impacts displacement of people and construction of replacement housing relative to what was identified in the 2013 FEIR. The Project consists of development consistent with the projected growth under the General Plan and no environmental conditions of approval related to population and housing are required.

4.15.PUBLIC SERVICES
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Would the project result in substantial adverse
physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities, the
construction of which could cause significant
environmental impacts, in order to maintain
acceptable service ratios, response times or other
performance objectives for any of the public services:

Fire Protection?
Police Protection?
Schools?
Parks?
Other public facilities?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to Public Services in Chapter 4.12 and determined the following:

Fire Protection
• Impact PS-1: Implementation of the proposed project (General Plan) would not result in the provision of or need for new or physically altered fire protection facilities, the construction or operation of which could cause significant environmental impacts because, per the Alameda County Fire Department (ACFD), the increase in population at project buildout would not require the construction or expansion of facilities. Further compliance with the provisions of the California Building Code and California Fire Code and implementation of the following General Plan goals, policies and actions would reduce the risks associated with fire hazards and minimize calls for fire and emergency medical response services in Newark: Goals CS-2 and CSF-4; Policies CSF-4.2, CSF-4.4 to CSF-4.7, and Actions CSF-4.F, CSF4.G and CSF-4.H. This impact is considered to be less than significant. • Impact PS-2: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable development, would not result in significant cumulative impacts with respect to fire protection service subject to the California Building Code, California Fire Code, and City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 61
development review of future projects under the General Plan and ACFD Strategic Business Plan.

This is a less than cumulatively considerable impact.

Law Enforcement Services
• Impact PS-3: Implementation of the proposed project (General Plan) would not result in a significant impact related to the construction or expansion of police facilities with continued collection of Capital Facilities Fees from development under the proposed project and implementation of General Plan Goal CSF-4, Policy CSF-4.1, and Actions CSF-4 and CSF-4.D. • Impact PS-4: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable growth, would not result in significant cumulative impacts with respect to law enforcement services subject to Capital Facilities Fees from development under the Plan and development review of future projects under the General Plan and because the changes and growth anticipated under the proposed Plan would not have any cumulative impact beyond the service boundary of the Newark Police Department service area. This is a less than cumulatively considerable impact.

Public Schools
• Impact PS-5: Implementation of the proposed project (General Plan) would not result in the provision of or need for new or physically altered school facilities, the construction or operation of which could cause significant environmental impacts subject to school impact fees and pursuant to the provisions of California Government Code Section 65996(3)(h) whereby payment of these fees is deemed to be full and complete mitigation of these impacts. This is a less than significant impact. Further, General Plan Policies CSF-2.1 and CSF-2.2, and Actions CSF-2.A and CSF-2.B provide the framework for the accommodation of increased enrollment as it occurs incrementally over the horizon of the proposed project.
• Impact PS-6: Implementation of the proposed project (General Plan) in combination with past, present, and reasonably foreseeable growth in the Newark Union School District Service area would result in less than significant cumulative impacts with respect to schools subject to the payment of school impact fees by future development under the Plan and implementation of the policies and actions identified above. This is a less than cumulatively considerable impact.

Parks
• Impact PS-7: Implementation of the proposed project (General Plan) would not result in substantial adverse physical impacts associated with the provision of new or physically altered parks and recreational facilities in order to maintain the City’s adopted ratio of parkland per thousand residents with the implementation of the General Plan Actions POS-3.A, POS-3.D and POS-3.H and subject to project-level CEQA review at the time future park facilities are proposed for construction in order to identify and mitigate associated impacts, as needed. This impact is considered to be less than significant.
• Impact PS-8 is discussed under the “Recreation Section”. • Impact PS-9 is discussed under the “Recreation Section”. • Impact PS-10 is discussed under the “Recreation Section”.

Other Facilities
• Impact PS-11: Implementation of the proposed project (General Plan) would not result in the need for new or physically altered library facilities with the implementation of the Goal CSF-1, Policy CSF-1.6, and Actions CSF-1.E and CSF-1.F. This impact is considered to be less than significant.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 62
• Impact PS-12: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable development, would result in less than significant cumulative impacts with respect to libraries because the proposed project is not anticipated to contribute to a substantial adverse impact on the library system’s ability to serve its constituents and future library expansion or improvements when and if identified would undergo project specific CEQA review. This is a less than cumulatively considerable impact.

Project Consistency with the 2013 FEIR

4.15(a) (Public Services) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded a less than significant level of impact on public utilities at built out of the General Plan, subject to implementation of the General Plan policies as identified under “General Plan EIR Findings”, development impact fees that would be required to offset the increase in the use of police, schools, parks and other services, and engagement of City departments in the review of future development projects to ensure that projects are designed and developed to minimize impacts.

The Project is consistent with the development potential specified in the General Plan for this site and analyzed in the 2013 FEIR, and as an industrial infill development would directly impact the demand for police and fire protection facilities. The Project plans were reviewed and accepted by the Fire and Police Departments, and it would comply with the applicable policies and actions outlined above under Impact PS-1 and PS-3. The Project does not propose any residential units but may indirectly impact schools and parks through demand that could potentially be generated by the employees of the facility and their families. The potential impact of industrial development on this site on Newark’s housing supply was evaluated in the 2013 FEIR and determined to be less than significant. The 2013 FEIR determined that much of the additional demand from the buildout of the General Plan was accounted for in the Newark Union School District (NUSD) projections.

The increase in demand for parks associated with population growth and development was also determined to be less than significant in the 2013 FEIR at built out of the General Plan. As such, the Project’s impact would be less than significant on schools and parks because it would be developed in accordance with the City’s General Plan land use designation and zoning applicable to the Project site.

Additionally, the Project would be subject to school impact fees where payment of these fees is deemed to be full and complete mitigation of school impacts pursuant to the provisions of California Government Code Section 65996(3)(h). Furthermore, as described in Chapter 4.16 of this document, the Project would include a private open space area, for use by the occupants of the industrial facility. The Project is also subject to development impact fees to fund maintenance, acquisition, and development of City of Newark facilities.

Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to public services other than those identified in the 2013 FEIR.

Conclusion
The Project would not result in any new or more severe impacts to public services relative to what was identified in the 2013 FEIR. The Project consists of development anticipated in and consistent with the General Plan and would be developed in accordance with the applicable zoning. Additionally, the Project would be subject to the required development impact fees would offset potential incremental increase in the use of services. No environmental conditions of approval related to public services are required.

4.16.RECREATION
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Would the project increase the use of existing
neighborhood and regional parks or other recreational
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 63
facilities such that substantial physical deterioration of the facility would occur or be accelerated?
b) Does the project include recreational facilities or
require the construction or expansion of recreational
facilities which might have an adverse physical effect
on the environment?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to recreational parks and facilities in Chapter 4.12, Public Services and Recreation, and determined the following:
• Impact PS-7: The proposed Plan would not result in substantial adverse physical impacts associated with the provision of new or physically altered parks and recreational facilities in order to maintain the City’s adopted ratio of parkland per thousand residents subject to implementation of POS-3.A, POS3.D, and POD-3.H. • Impact PS-8: Implementation of the proposed project (General Plan) would not increase the use of existing neighborhood and regional parks or other recreational facilities, such that substantial physical deterioration of the facility would occur, or be accelerated with the implementation of General Plan Goal POS-3, and Policies POS-3.1, POS-3.2 and POS-3.8. This impact is considered a less than significant impact.
• Impact PS-9: Implementation of the proposed project (General Plan) would not include or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment as described under Impact PS-7 above. This impact is considered to be less than significant.
• Impact PS-10: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable growth, would not result in significant cumulative impacts with respect to parks and recreational facilities with the implementation of the following General Plan goal, policies and actions: Goal PR-5, Policies PR-1.5, PR-4.4, PR-5.1 to PR-5.8, and Actions PR-5.A, PR5.B, PR-5.C and PR-5.D. This is a less than cumulatively considerable impact.

Project Consistency with the 2013 FEIR

4.16(a) (Deterioration of Parks) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that the General Plan would not result in a significant impact to existing recreational facilities because of increased use. The Project does not directly propose the construction of any parks or recreational facilities; however, it includes numerous goals, policies, and actions that seek to promote and encourage the development of parks in the Plan Area. Specific actions for increasing provision of parks are identified above in Impact PS-7 discussion. Further, General Plan goals and policies identified under Impact PS-8 and PS-9 would be implemented to keep up with the anticipated population increase at buildout, modernization and maintenance of existing recreations facilities.

The Project is generally consistent with the General Plan as an industrial facility on a site designated for such use in the General Plan. Additionally, the Project would include a common open space area for employees at the front of the proposed industrial facility. This space would serve new employees that would occupy the proposed industrial facility. The Project would also be subject to parks impact fees, which are used to fund maintenance, acquisition, and development of Newark parks and recreational facilities. Therefore, the Project implementation would not result in new or more severe impacts relative to the 2013 FEIR with respect to deterioration of parks or other recreational facilities.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 64

4.16(b) (Additional Recreational Facilities) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that the General Plan would not result in a significant impact related to an adverse physical effect on the environment due to the construction or expansion of recreational facilities. The General Plan does not directly propose the construction of any parks or recreational facilities; however, it includes goals, policies, and actions that seek to promote and encourage the development of parks in the Plan Area. The General Plan identified facilities in the Dumbarton TOD and Southwest Newark Residential and Recreational Focus Area that were analyzed in the respective EIRs at a programmatic level and the specific park projects will be analyzed at the project level at the time of their development. However, the Project is not in the Dumbarton TOD and Southwest Newark Residential Focus Area and potential impacts from future park facilities identified in the General Plan would not be attributable Project.

The Project proposes an outdoor employee open space at the front of the proposed industrial facility, which would accommodate new employees. As such, the proposed Project would not require the construction or expansion of recreational facilities. Furthermore, the Project would contribute development impact fees to fund parkland acquisition as well as maintenance and development of Newark parks and recreational facilities.

Therefore, environmental impacts related to construction, or expansion of recreational facilities are not expected to be substantially new or more severe relative to the 2013 FEIR as a result of the proposed Project.

Conclusion
The Project consists of an infill development of an industrial facility anticipated by the General Plan and will be subject to park impact fees. Therefore, the Project would not result in any new or more severe impacts relative to what was identified in the 2013 FEIR with respect to recreation.

4.17.TRANSPORTATION
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Conflict with a program, plan, ordinance or policy
addressing the circulation system, including transit,
roadway, bicycle and pedestrian facilities?
b) Would the project conflict or be inconsistent with
CEQA Guidelines section 15064.3, subdivision (b)?
c) Substantially increase hazards due to a geometric
design feature (e.g., sharp curves or dangerous
intersections) or incompatible uses (e.g., farm
equipment)?
d) Result in inadequate emergency access?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013; and Transportation Impact Study, prepared by Kimley Horn, revised May 2025.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to Traffic and Circulation in Chapter 4.13 and determined the following:
• Impact TRANS-1: Implementation of the proposed project (General Plan) would cause intersection operation to degrade to an unacceptable LOS F at the a) Ardenwood Boulevard and SR 84 westbound ramps intersection during the AM peak hour in 2035, b) the Newark Boulevard and SR 84 eastbound City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 65
ramps intersection during the PM peak hour in 2035, and c) the Cherry Street/Boyce Road and Stevenson Boulevard intersection during the PM peak hour at buildout. This is considered a significant impact and remains significant and unavoidable with mitigation. A statement of overriding consideration was adopted with the certification of the 2013 FEIR.

None of the above referenced intersections would be impacted by the Project traffic and were not required to be studied as part of the Project.
• Impact TRANS-2: Implementation of the proposed project (General Plan) would not conflict with the 2011 Alameda County Transportation Commission (CTC) Congestion Management Program (CMP) and would not add traffic representing more than 1 percent of the roadway capacity to any of the Metropolitan Transportation System (MTS) roadway segments in the Plan Area or its vicinity.

Additionally, congestion levels would be reduced by the following General Plan goals, policies and actions: Goals T-3, T-4, Policies T-3.1, T-3.3, T-3.4, T-4.1 to T-4.9, T-6.1, T-6.2 and T-6.4, and Actions T-3.A to T-3.C, T-4, T-4.A to T-4.E. This impact is considered a less than significant impact. • Impact TRANS-3: Implementation of the proposed project (General Plan U) would not result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks because as described in Chapter 4.9 and 4.13 of this document there are no airports in the vicinity of the Project site except helipads located 1.7 miles away where landings are infrequent. This impact is considered a less than significant impact. • Impact TRANS-4: Implementation of the proposed project (General Plan) would not substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment) subject to the design and safety standards in Newark Municipal Code, the State Building Code, and the State-referenced provisions of the International Fire Code and the implementation of the General Plan goals, policies and actions, including Policies T-1.6, T-2.7, T-2.8, T-5.11, and Action T-1.B This impact is considered a less than significant impact. • Impact TRANS-5: Implementation of the proposed project (General Plan) would not result in inadequate emergency access subject to the subject to the design and emergency standards specified in the Newark Municipal Code, the State Building Code, and the State-referenced provisions of the International Fire Code and the implementation of General Plan policies and actions intended to ensure adequate emergency access and efficient circulation, including Policies T-5.1 and T-5.9, and Action T-1.B. This impact is considered a less than significant impact. • Impact TRANS 6: Implementation of the proposed project (General Plan) would not conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities because of the following:
o City of Newark has adopted a Complete Streets Policy that is consistent with California AB 1358, and requires that transportation improvements in Newark be planned, funded, designed, constructed, operated, and maintained to provide safe mobility for all users appropriate to the function and context of the facility. The Complete Streets Policy is supported by General Plan Goal T-1, Policies T-1.1, T-1.3, T-1.6, and Actions T-1.B to T-I.D. o The General Plan is consistent with the Newark Transportation System Management Ordinance, adopted to manage employment-related travel demand supported by Policy T-4.6. o The City’s ongoing efforts at preparation of a Pedestrian and Bicycle Master Plan for a system of bikeways and support facilities within Newark that will also establish design standards for bicycle facilities, as well as education and safety programs. The General Plan goals, policies and actions that support the development of the City’s Pedestrian and Bicycle Master Plan are as follows: Goal T-2, Policies T-2.1 to T-2.13, and Actions T-2.A to T-2.F, T-2.H to T-2.J.

This impact is considered a less than significant impact. • Impact TRANS 7: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable projects, would not result in additional cumulatively considerable impacts because cumulative impacts would be the same as impacts specific to the proposed project City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 66
that would be addressed locally through specific road improvements, as well as through implementation of the goals, policies, and actions of the General Plan that seek to reduce existing vehicle trips, minimize the addition of new vehicle trips, and lower per capita VMT. This is a less than cumulatively considerable impact.

Level of Service to Vehicle Miles Traveled
Level of service (LOS) has historically been used as a standard measure of traffic service within the City of Newark. Pursuant to SB 743, as of July 1, 2020, lead agencies are required to evaluate transportation impacts of a project using a Vehicle Miles Traveled (VMT) metric, which focuses on balancing the needs of congestion management with statewide goals related to infill development, promotion of public health through increased active mobility facilitated by closer proximity to alternative travel modes and reduction of greenhouse gas emissions.

In December 2018, the California Governor’s Office of Planning and Research (OPR) published the Technical Advisory on Evaluating Transportation Impacts in CEQA, which provides recommendations for evaluating a project’s transportation impact using a VMT metric, thresholds of significance, and mitigation measures.

Pursuant to Government Code Section 15064.3(b), lead agencies have discretion to select the most appropriate methodology for evaluating a project’s VMT impacts. To date, February 2024, the City of Newark has not adopted VMT thresholds or guidelines. In the absence of locally adopted thresholds at the time of review of the proposed Project, the City of Newark relies upon recommendations set forth in the Governor’s Office of Planning and Research (OPR)’s Technical Advisory. The Technical Advisory provides qualitative thresholds for which projects are considered to have characteristics that will not result in significant VMT impacts and are therefore not required to conduct transportation analysis for VMT.

Vehicle Miles Traveled (VMT) Screening Analysis
SB 743 established a change in the metric to be applied for determining traffic impacts associated with development projects. The OPR Technical Advisory (December 2018) provides guidance to analysts and local jurisdictions for implementing VMT as a metric for determining the transportation impact for land use projects The OPR guidelines state that for analysis purposes, “VMT” refers to automobile VMT, specifically passenger vehicles and light trucks. Heavy truck traffic is typically excluded. The OPR methodology and implementation guidelines were adopted by the Alameda County Transportation Commission in July 2020.

Project Consistency with the 2013 FEIR
The following discussion is based on the Transportation Impact Study, dated May 2025, prepared by Kimley Horn (Appendix E):

4.17(a) (Conflicts with Plans, Policies, Ordinances) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that the implementation of the General Plan would not conflict with the 2011 Alameda CTC (ACTC) Congestion Management Program (CMP). The CMP is a technical document that describes strategies and procedures to: (1) measure the performance of the county’s multimodal transportation system, (2) address roadway congestion and improve the performance of a multimodal system, and (3) connect transportation and land use planning. Pursuant to state legislation, the ACTC is required to update the CMP every two years and the ACTC CMP has been updated after the adoption of the General Plan in 2013 and certification of the 2013 FEIR. However, the technical elements of a CMP remain the same. The CMP recommends a detailed transportation impact analysis (TIA) for projects generating 100 vehicle-trips or more during the weekday PM peak hour.

The Transportation Impact Study, prepared by Kimley Horn (Appendix E), estimated that the Project would generate 3,339 net daily trips of which 303 (248 inbound, 55 outbound) trips would be generated during the a.m. peak hour and 376 (151 inbound, 225 outbound) trips would be generated during the p.m. peak hour.

Since the project is expected to generate greater than 100 net PM peak hour trips, a CMP roadway segment analysis was required. The Transportation Impact Study evaluates the impacts on the transportation infrastructure due to the addition of traffic from the Project at 10 study intersections during the morning (a.m.) City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 67
and afternoon (p.m.) peak hours under No Project and Plus Project scenarios for existing conditions using the Level of Service analysis methodology. While the LOS standards are no longer used for identifying impacts under CEQA, the LOS analysis is still used for determining consistency with adopted agency plans and standards.

Based on the City of Newark standards, a project would result in an adverse impact on traffic conditions at a signalized intersection if for either peak hour:

1. The level of service at the intersection degrades from an acceptable LOS D or better under no project conditions to an unacceptable LOS E or F under project conditions.

2. The level of service at the intersection is an unacceptable LOS (e.g. LOS E or F) under no-project conditions and the addition of project trips causes the average delay at the intersection to increase by four (4) or more seconds.

The Transportation Impact Study, prepared by Kimley Horn, concludes that development of the proposed project and resulting traffic generation would result in no LOS operations deficiencies. However, the Project would result in a queuing deficiency at the northbound left-turn lane of Cherry Street and Central Avenue in the Existing Plus Project Conditions. To address the queuing deficiency in the AM and PM peak hours, the Traffic Impact Study recommends that a twice per cycle left-turn phase be provided for the northbound leftturn lane of Cherry Street and Central Avenue. This recommendation is included below as COA TRAN-1. The signal timing splits should be adjusted accordingly. With these improvements, the Project would add less than 25 feet of queue to the movement in comparison to Existing Conditions.

The Transportation Impact Study also evaluated unsignalized intersections. Unsignalized intersections that operate unacceptably are not considered a project deficiency if the intersection is operating unacceptably without the project and the increase in delay is less than four (4) seconds, or the intersection does not meet the signal warrants. The following intersections operate unacceptably and add more than four (4) seconds of delay, but each are not considered a project deficiency because the intersections do not meet signal warrants:
• Cherry St/Robertson Ave (AM and PM peak hours)
• Cherry St/Moores Ave (AM and PM peak hours)
Pedestrians and Bicyclists
The City has adopted a “Pedestrian and Bicycle Master Plan,” on February 23, 2017, that comprehensively addresses the City’s biking and walking environment in the years to come. The Project site is served by a Class III bicycle route in each direction along Central Avenue adjacent to the project. In Class III bicycle routes, bicyclists share the roadway with motorists. A Class II bicycle lane also exists on Sycamore Street from Cedar Boulevard to Central Avenue. Within the Project site, bicyclists can share the drive aisles with motorists.

In the vicinity of the project site, there are limited pedestrian and bicycle facilities. On Central Avenue adjacent to the Project site, there are currently no pedestrian facilities, and no sidewalks. The Project proposes to install a sidewalk along the site frontage to Central Avenue. As such, there would be sufficient pedestrian facilities adjacent to the Project site and to nearby uses to provide adequate connectivity. The Project would not introduce any conflicts with the City’s Pedestrian and Bicycle Master Plan. Therefore, the Project will not introduce new or more severe impacts due to a conflict with policies related to vehicular level of service, pedestrian, bicycle and transit services, beyond those identified in the 2013 FEIR.

4.17(b) (Conflict with 15064.3(b) VMT) No Change Relative to the 2013 FEIR: Following adoption of the General Plan and certification of the 2013 FEIR, SB 743 went into effect. In the absence of locally adopted VMT thresholds, the City of Newark is relying upon the Alameda County Transportation Commission (ACTC) guidelines for VMT analysis drawn from the Technical Advisory for evaluating VMT issued by the Governor's Office of Planning and Research (OPR). A VMT Screening Analysis was completed for the Project (Appendix E) based on the ACTC guidelines.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 68
With respect to VMT, the ACTC guidelines include a screening process that describes five scenarios in which a project would be exempted from a VMT analysis requirement: 1) projects exempt from CEQA analysis, 2) small projects, 3) local serving projects, 4) projects in transit priority areas, and 5) projects in low VMT areas.

ACTC defines a low VMT area as a city or unincorporated portion within one of the ACTC subregions where home‐based VMT per resident is at least 15 percent below the countywide VMT or where the commute VMT per employee is at least 15 percent below the regional average. Therefore, under ACTC guidelines, an employee-based project would have a significant impact on VMT if it would generate VMT per employee that is higher than 85 percent of the South Alameda County average. The ACTC model includes traffic analysis zones (TAZ) covering geographic areas throughout Alameda County. As indicated in the Project’s Transportation Impact Study , the Project is within a South Planning Area Traffic Analysis Zone (TAZ) that has a VMT per employee of 14.02. The VMT per employee threshold, based on the South Planning Area Average, is at or below 14.6 (which is 15 percent below the 17.2 VMT per employee). Therefore, the proposed Project would not result in a significant impact relative to VMT, since the project’s VMT would be below the per employee threshold.

4.17(c) (Geometric Design Feature Hazard) No Change Relative to the 2013 FEIR: The 2013 FEIR determined that there would be a less than significant impact as it relates to hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment), subject to design and construction of the transportation and circulation improvements consistent with local, regional, and federal standards and implementation of General Plan policies identified under Impact TRANS-4 above.

Access to the Project would be provided in generally the same location along Central Avenue with two proposed 40-foot-wide driveway entrances. The “Project Transportation Impact Analysis” includes sight distance analysis at the northernmost (identified as east driveway in the study) driveway, and the second driveway to the south of it (identified as east driveway in the study). The northernmost driveway provides truck access to the site while automobile traffic would utilize the second driveway, south of the first driveway . The sight distance analysis indicates that the sight triangles at the northernmost Project driveway would be clear of obstructions for a truck exiting the driveway to observe oncoming northbound and southbound vehicles along Central Avenue. Similarly, the sight triangles at the second driveway to the south of the first driveway would be clear of obstruction for automobile traffic.

As shown on the Site Plan (Figure 5), the internal vehicular circulation network on the Project site would consist of a drive aisle encircling the proposed industrial building. Internal pedestrian sidewalks will be provided on the three sides of the proposed industrial facility where truck loading bays are not proposed. The proposed internal vehicular circulation has been reviewed and accepted by the Fire Department and Engineering Division staff of the City.

The Project does not propose off-site transportation-related improvements, and the overall geometric design feature will not be altered upon completion of the Project. Therefore, the Project will not result in new or more severe impacts beyond those analyzed in the 2013 FEIR by way of introducing a hazardous design feature.

4.17(d) (Emergency Access) No Change Relative to the 2013 FEIR: The 2013 FEIR concluded that impacts related to emergency access would be less than significant subject to design and construction of the transportation and circulation improvements consistent with local, regional, and federal standards and implementation of General Plan policies identified under Impact TRANS-5 above. The Project’s circulation plan would be subject to review by the Alameda County Fire Department and the City Public Works Department that would ensure that all emergency access requirements are met. The Project’s internal circulation would be adequate and provide sufficient street widths and drive aisles to allow for fire truck access to the proposed Project. During construction activities, temporary lane closures primarily on Central Avenue may occur during frontage improvements and utility work that will be coordinated with the Alameda County Fire Department, City Police Department, and emergency responders to ensure that through access is maintained and adequate response times are achievable. Given these factors, the Project’s emergency access is in accordance with the applicable General Plan policies and actions. Therefore, emergency vehicle access would be adequate under the proposed Project and there would be no new or more severe impacts relative to the 2013 FEIR with respect to emergency access.

Conclusion and Environmental Conditions of Approval
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 69
The Project would not result in any new or more severe impacts to traffic and circulation including transportation relative to what was identified the 2013 FEIR. With the conditions of approval specified below, the Project would be generally consistent with the General Plan:

COA TRAN-1: Project improvements shall include a twice per cycle left-turn phase at the northbound left-turn lane of Cherry Street and Central Avenue.

4.18. TRIBAL CULTURAL RESOURCES
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
Cause a substantial adverse change in the
significance of a tribal cultural resource, defined in
Public Resources Code section 21074 as either a site,
feature, place, cultural landscape that is
geographically defined in terms of the size and scope
of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of
historical resources as defined in Public Resources
Code section 5020.1(k), or
b) A resource determined by the lead agency, in its
discretion and supported by substantial evidence, to
be significant pursuant to criteria set forth in
subdivision (c) of Public Resources Code Section
5024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead
agency shall consider the significance of the resource
to a California Native American tribe.

Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

According to Public Resources Code (PRC) Section 21074, tribal cultural resources are defined as follows:

1. Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following:
a. Included or determined to be eligible for inclusion in the California Register of Historical Resources (CRHR); or
b. Included in a local register of historical resources as defined in PRC Section 5020.1(k).

2. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in PRC Section 5024.1(c). In applying the criteria set forth in PRC Section 5024.1(c), the lead agency shall consider the significance of the resource to a California Native American tribe.

3. A cultural landscape that meets the criteria of PRC Section 21074(a) to the extent that the landscape is geographically defined in terms of the size and scope of the landscape.

4. A historical resource described in PRC Section 21084.1, a unique archaeological resource as defined in PRC Section 21083.2(g), or a “non-unique archaeological resource” as defined in PRC Section 21083.2(h) if it conforms with the criteria of PRC Section 21074(a).

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 70
General Plan EIR Findings
The 2013 FEIR concluded that the implementation of the General Plan would result in significant and unavoidable impacts related to cultural resources, which may include tribal cultural resources, in the Southwest Newark Residential and Recreational Focus Area. The Project site is not included in the Southwest Newark Residential and Recreational Focus Area. In other locations in the Plan Area, General Plan Policy LU-5.5 would render these impacts to tribal resources less than significant.

Project Consistency with the 2013 FEIR

4.18(a-b) (Listed or Eligible for Listing, Significant Resources) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR identifies the Dumbarton TOD Focus Area and the Southwest Newark Residential and Recreational Focus Area as sensitive for potential archaeological resources. The Project site is not located within any of these areas. It has been previously developed as a storage yard. Public Resources Code Section 21080.3.1 requires lead agencies to provide notice to tribes that are traditionally and culturally affiliated with the geographic area of a proposed project if they have requested notice of projects proposed within that area.

No tribes have requested notice of projects proposed in the city of Newark. Therefore, the Project would not result in new or more severe impacts relative to the 2013 FEIR as it relates to a cultural resource of value to a tribe that is listed or eligible for listing in the CRHR, or in a local register of historical resources as defined in PRC Section 5020.1(k).

Additionally, Condition of Approval CUL-1, which is imposed on the Project and set forth in Chapter 4.5, provides for the protection of buried cultural resources, including tribal cultural resources, in the event of discovery. Therefore, the proposed Project would not result in new or more severe impacts than those identified in the 2013 FEIR, with respect to significant tribal resources.

Conclusion and Environmental Condition of Approval
The Project would not result in any new or more severe impacts to tribal cultural resources, relative to what was identified in the 2013 FEIR. Additionally, Condition of Approval CUL-1 is imposed on the Project and would provide for the protection of buried cultural resources, including tribal cultural resources, in the event of discovery.

4.19.UTILITIES AND SERVICE SYSTEMS
Would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or
storm water drainage, electric power, natural gas, or
telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future
development during normal, dry and multiple dry
years?
c) Result in a determination by the wastewater
treatment provider which serves or may serve the
project that it has adequate capacity to serve the
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 71
project’s projected demand in addition to the
provider’s existing commitments?
d) Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of
solid waste reduction goals?
e) Comply with federal, state, and local management
and reduction statutes and regulations related to solid waste?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts to Utilities and Service Systems in Chapter 4.14 and determined the following:

Water Supplies/Infrastructure
• Impact UTIL-1: Implementation of the proposed project (General Plan) would increase water demand; however, sufficient water supplies are available to serve the project from existing entitlements and resources. Further, the following General Plan goal, policies and actions would ensure that new development under the proposed project contribute to reducing water demands in the service area:

Goal CS-3, Policies CS-3.2, CS-3.3, CS-3.9, CSF-5.1, CSF-5.3, CSF-5.6 to CSF-5.8, and Actions CS3.B, CSF-5.A, CSF-5.B. This impact is considered to be less than significant. • Impact UTIL-2: Implementation of the proposed project (General Plan) would not require or result in the construction of new water facilities or expansion of existing facilities, the construction of which would cause significant environmental effects because sufficient water supplies are available to serve the project from existing entitlements and resources as described in Impact UTIL-1. Further, General Plan Policies CSF-5.7 and CSF-5.8 and Action CSF-5.B would ensure that impacts to water facilities would be adequately addressed. This impact is considered to be less than significant. • Impact UTIL-3: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable development, would result in less than significant cumulative impacts with respect to water supply because cumulative water demands would neither exceed planned levels of supply nor require building new water treatment facilities or expanding existing facilities beyond what is currently planned in the ACWD’s Capital Improvements Plan (CIP).

Additionally, future development would be required to pay development fees, which would offset the costs of system maintenance and capital upgrades to support the new development in the ACWD service area.

Wastewater
• Impact UTIL-4: Implementation of the proposed project (General Plan) would not exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board (SFRWQCB). This impact is considered a less than significant impact.
• Impact UTIL-5: Implementation of the proposed project (General Plan), would not require or result in the construction of new wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects subject to applicable regulations of the Union Sanitary District (USD) and City of Newark, including their development review process and fees, as well as the implementation of General Plan policies and actions, including Policies CSF- City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 72

5.2, CSF-5.3, CSF-5.7, CSF-5.8, and Action CSF-5.C. This impact is considered to be less than significant.
• Impact UTIL-6: Implementation of the proposed project (General Plan), would not result in a determination by the wastewater treatment provider which serves or may serve the project that it does not have adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments. This is because future demands from the implementation of the General Plan would not exceed the capacity of Newark’s wastewater treatment plant, the Alvarado Wastewater Treatment Plant (AWWTP), and the implementation of policies and actions identified under Impact UTIL-5 would address potential impacts to USD collection system. Additionally, future projects pursuant to the General Plan would be subject to the City of Newark and USD Development Review Process, USD Capacity Fees, and NMC Chapter 3.24 Development Impact Fees. This impact is considered a less than significant impact.
• Impact UTIL-7: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable development, would not result in significant cumulative impacts with respect to wastewater because the increase in volume of wastewater as a result of the project would not be cumulatively considerable, cumulative demand would not substantially impact the existing or planned capacity of the wastewater treatment system, and the construction of new wastewater treatment facilities would not be necessary. Further, implementation of the following General Plan policies would ensure provision of adequate wastewater facilities: Policies CSF-5.2, CSF-5.7 and CSF-5.8. This is a less than cumulatively considerable impact.

Stormwater
• Impact UTIL-8: Implementation of the proposed project (General Plan) would not require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects subject to compliance with the C.3 provisions of the Alameda County Clean Water Program. Further, the following General Plan policies and actions would reduce demand on the storm drainage system: Policies CSF-5.4 to CSF-5.8, CS6.4, CS-6.5, and Actions CSF-5.D, CSF-5.E, CS-3.G and CS-3.H. • Impact UTIL-9: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable development, would not result in significant cumulative impacts with respect to stormwater facilities because implementation of the regulations and policies identified above would not substantially increase either the volume or the velocity of stormwater flowing into the storm sewer system that would be upgraded and expanded as necessary to support development in Newark. This is a less than cumulatively considerable impact.

Solid Waste
• Impact UTIL-10: Implementation of the proposed project (General Plan) would be served by a landfill with sufficient permitted capacity to accommodate the project’s solid waste disposal needs. Further, the General Plan contains goals and policies intended to reduce waste generation and the demand for landfill capacity. This impact is considered to be less than significant. • Impact UTIL-11: The proposed project (General Plan) would comply with federal, State, and local statues and regulations related to solid waste with implementation of General Plan Actions CS-8.A, CS-8.C, CS-8.D, and CS-8.F. This impact is considered to be less than significant. • Impact UTIL-12: Implementation of the proposed project (General Plan), in combination with past, present, and reasonably foreseeable development, would not result in significant cumulative impacts with respect to solid waste because increase in solid waste generation would be minimal due to waste source reduction and diversion programs that include recycling, composting, mandatory construction and demolition (C&D) debris recycling, and mandatory commercial recycling.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 73
Project Consistency with the 2013 FEIR

4.19(a) (Relocation/Expansion of Utilities) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that the implementation of the General Plan would not significantly increase demands for utilities and services systems including water, wastewater, storm drain, and solid waste and impacts related to relocation/expansion of utilities would be less than significant. The proposed Project would develop an industrial facility that would generate demand for utilities and services.

The site is served by existing utilities, including water, wastewater, and storm drain infrastructure which will service the proposed development on the Project site. The proposed development would include installation of water, sanitary sewer and storm drain lines that will connect to the existing infrastructure, respectively. However, the demand for utilities and service systems generated by the infill development Project is anticipated by the 2013 FEIR and does not require the relocation or substantial expansion of infrastructure. Therefore, the Project’s impacts related to the relocation, construction, or expansion of utilities will not result in new or more severe impacts relative to the 2013 FEIR.

4.19(b) (Sufficient Water Supplies) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that the implementation of the General Plan would result in a less than significant impact to water supplies because sufficient water supplies during normal, dry, and multiple dry years are available to serve development pursuant to the General Plan from existing entitlements and resources. Additionally, applicable General Plan goals, policies and actions as identified under Impact UTIL-1 would serve to reduce water demand generation by development pursuant to the General Plan.

The proposed Project is consistent with the General Plan and its designated land use. Additionally, the Project would include water efficient landscaping that complies with the 2015 Water Efficient Landscape Ordinance and as a result it would reduce the Project’s water demand. Additionally, the Project proposes the use of water efficient plumbing fixtures and irrigation per Alameda County Water District (ACWD) measures. The Project is in an industrial area that has been previously developed and would connect to the existing water distribution system. The Project would be subject to fees required by ACWD for the maintenance of the water system and capital upgrades. Therefore, impacts related to water supplies would not result in new or more severe impacts relative to those identified in the 2013 FEIR.

4.19(c) (Wastewater Capacity) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that implementation of the General Plan would result in less than significant impact related to waste water treatment capacity. The Project is generally consistent with the General Plan and would connect to existing wastewater infrastructure. As such, the Project would be within the flow capacity analyzed as part of the 2013 FEIR. Furthermore, the Project is subject to USD fees and City of Newark Development Impact Fees, which would be used to fund maintenance and expansion of wastewater conveyance systems and treatment facilities, as required. As such, the proposed Project will not cause or exceed wastewater treatment requirements set forth by the SFRWQCB, nor will the Project necessitate the expansion or construction of wastewater conveyance or treatment facilities. Therefore, impacts to wastewater capacity would not result in new or more severe impacts relative to those identified in the 2013 FEIR.

4.19(d,e) (Solid Waste Generation/Compliance with Solid Waste Management) No Substantial Change Relative to the 2013 FEIR: The 2013 FEIR concluded that implementation of the General Plan would have a less than significant impact related to solid waste because future developments under the Plan would be served by a landfill with sufficient permitted capacity to accommodate their solid waste disposal needs. Further, implementation of the applicable General Plan goals and policies would reduce waste generation and the demand for landfill capacity.

The Project would contribute to the generation of solid waste within the General Plan area, but the Project applicant would be required to adhere to all regulations governing the disposal of solid waste, solid waste management and reduction goals. A “Will Serve” letter for the Project, dated January 16, 2023, was provided by the Republic Services that provides solid waste collection services for recycling and waste disposal.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 74
Therefore, solid waste related impacts from the Project construction and operation would not result in new or more severe impacts relative to those identified in the 2013 FEIR.

Conclusion and Environmental Conditions of Approval
The Project would not result in any new or more severe impacts to utilities and service systems relative to what was identified in the 2013 FEIR with the implementation of the following condition of approval:

COA UTIL-1: Prior to the issuance of a building permit, the applicant shall pay the applicable impact fees, in the amount in effect at the time.

4.20.WILDFIRE
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones,
would the project:

New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Substantially impair an adopted emergency
response plan or emergency evacuation plan?
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to, pollutant concentrations from a wildfire
or the uncontrolled spread of a wildfire?
c) Require the installation or maintenance of
associated infrastructure (such as roads, fuel breaks,
emergency water sources, power lines or other
utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013; and State Responsibility Fire Hazard Severity Zone Maps, Office of the State Fire Marshall.

General Plan EIR Findings
The 2013 FEIR evaluated potential impacts related to Wildfires in Chapter 4.9, Hazards and Hazardous Materials and determined the following:
• Impact HAZ-8: As also discussed under Chapter 4.9 of this document, implementation of the proposed project (General Plan) would not expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands because the Plan Area is surrounded on all sides[sic] by land within the limits of the City of Fremont and is not designated as having high, very high, or extreme wildland fire threat to people, as determined by CAL FIRE’s Wildlife Urban Interface Fire Threat data. Future development in the Plan Area would be constructed pursuant to the California Building Code, California Fire Code, and the City of Newark Municipal Code and the General Plan Goal EH-1 and Policies EH1.1 and EH-1.2 would further ensure minimization of risks from wildland fires. This impact is considered to be less than significant.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 75
Project Consistency with the 2013 FEIR

4.20(a-d) (Impair Emergency Plans, Exacerbate Wildfire Risk Exacerbation, Infrastructure Contributing to Wildfire Risk, Exposure to Wildfire-Related Risks – if located in or near state responsibility areas or lands classified as very high fire hazard severity zones) No Change Relative to the 2013 FEIR: As indicated in Chapter 4.9 of this document, the Project site and lands surrounding and in the vicinity of the Project site are not in an area categorized by CAL FIRE as any of the Fire Hazard Severity Zones, including Very High Fire Hazard Severity Zones (VFHSZ). The Project site and surrounding lands are not located in or near state responsibility areas or lands classified as VFHSZ. Therefore, the Project will not result in a new significant impact or substantially increase the severity of a previously identified significant impact relative to the 2013 FEIR.

Conclusion
The Project and surrounding land are not located in or near state responsibility areas or lands classified as Very High Fire Hazard Severity Zones. Therefore, the Project would not result in any new or more severe impacts due to wildfire relative to what was identified the 2013 FEIR.

4.21. MANDATORY FINDINGS OF SIGNIFICANCE
New
Significant
Impact Not
Identified in
2013 FEIR
More
Severe
Impact
Relative to
2013 FEIR
No
Substantial
Change
Relative to
2013 FEIR
No Change
Relative to
the 2013
FEIR
a) Does the project have the potential to substantially degrade the quality of the environment, substantially
reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal
community, substantially reduce the number or restrict
the range of a rare or endangered plant or animal or
eliminate important examples of the major periods of
California history or prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable? (“Cumulatively
considerable” means that the incremental effects of a
project are considerable when viewed in connection
with the effects of past projects, the effects of other current projects, and the effects of probable future
projects)?
c) Does the project have environmental effects which
will cause substantial adverse effects on human
beings, either directly or indirectly?
Sources: City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013.

General Plan EIR Findings
As presented above in Sections 4.1 through 4.20, the 2013 FEIR included an evaluation of cumulative impacts associated with implementation of the General Plan.

Project Consistency with the 2013 FEIR
City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 76

4.21(a) (Degrade the Environment) No Change Relative to the 2013 FEIR: The Project is located within the General Plan area boundary and potential impacts associated with its development have been anticipated by the City’s General Plan and analyzed in the 2013 FEIR. The Project is consistent with the General Plan Land Use designation, applicable goals, policies, and programs and is required to comply with applicable state, local and federal regulations.

As described in this document, the Project has the potential to result in environmental impacts primarily associated with temporary construction activities related to Air Quality, Biological Resources, Cultural Resources, Geology, Greenhouse Gas Emissions, Hazardous Materials Noise and Utilities; Aesthetics related impact that would pertain to Project operation. Environmental conditions of approval as identified would avoid, reduce, or offset impacts consistent with the 2013 FEIR. With the implementation of conditions of approval set forth in this document with respect to Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology, Greenhouse Gas Emissions, Hazardous Materials, Noise and Utilities as well as adherence to the City’s uniformly applied development standards, the Project’s potential to degrade the quality of the environment would be substantially the same as that analyzed in the 2013 FEIR. Therefore, the Project will not degrade the quality of the environment, reduce habitat, or affect cultural resources beyond what has already been disclosed and analyzed in the certified 2013 FEIR.

4.21(b) (Cumulatively Affect the Environment) No Change Relative to the 2013 FEIR: The CEQA Guidelines define cumulative impacts as “two or more individual effects which, when considered together, are considerable or which compound or increase other environmental impacts. The individual effects may be changes resulting from a single project or an increase in environmental impacts. The cumulative impact from several projects is the change in the environment which results from the incremental impact of the proposed project when added to other closely related past, present, and reasonably foreseeable probable future projects.

Cumulative impacts can result from individually minor but collectively significant projects taking place over a period of time (Guidelines, Section 15355(a)(b)).

The analysis of cumulative impacts for each environmental factor can employ one of two methods to establish the effects of other past, current, and probable future projects. A lead agency may select a list of projects, including those outside the control of the agency, or alternatively, a summary of projections. These projections may be from an adopted general plan or related planning document or from a prior environmental document that has been adopted or certified; these documents may describe or evaluate the regional or area-wide conditions contributing to the cumulative impact.

Cumulative impacts of the implementation of the General Plan were evaluated in the 2013 FEIR and found to be less than significant as discussed in Chapter 4.1 to 4.20 of this document. Development of the Project is consistent with the General Plan and the Project is subject to environmental conditions of approval as well as uniformly applied development standards. Implementation of identified conditions of approval and uniformly applied development standards would ensure that development of the proposed Project would not result in cumulatively considerable environmental impacts beyond those analyzed in the 2013 FEIR.

4.21(c) (Substantial Adverse Effect on Humans) No Substantial Change Relative to the 2013 FEIR: The Project would not result in any new or more substantial adverse effects on humans relative to the 2013 FEIR findings for the General Plan because the Project is located in the Plan area and consistent with the General Plan. With implementation of the identified environmental conditions of approval, the Project will not result in new or more severe impacts beyond those identified in the 2013 FEIR that would directly or indirectly cause substantial adverse effects on human beings.

Conclusion
The Project would not result in any new or more severe impacts relative to what was identified the 2013 FEIR subject to identified environmental conditions of approval and standard regulatory requirements. No environmental conditions of approval related to mandatory findings of significance are required.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 77

5. REFERENCE DOCUMENTS
The following reference documents are hereby incorporated by reference and are available for review during normal business hours at the City of Newark, 37101 Newark Boulevard, Newark, CA 94560, in the Community Development Department.

5.1. TECHNICAL APPENDICES
A. Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the 6756 Central Avenue, July 19, 2024, prepared by FirstCarbon Solutions.

B. Geotechnical Investigation, Central Avenue Logistics Center, October 13, 2022, prepared by Cornerstone Earth Group.

C-1. Phase I Environmental Site Assessment Report, April 30, 2024, prepared by Farallon Consulting.

C-2. Data Gap Investigation and Request for Site Closure, September 13, 2023, prepared by Farallon Consulting.

D-1. Acoustical Assessment, 6750 Central Avenue Project, City of Newark, California, December 2023, prepared by Kimley Horn.

D-2. General Plan Noise Policy Consistency Analysis, March 2023, prepared by Kimley Horn.

E. Transportation Impact Study, prepared by Kimley Horn, dated May 2025.

5.2. OTHER DOCUMENTS REFERENCED

1. Alameda County Water District Groundwater Management Policy, Adopted January 26, 1989, Amended March 22, 2001

2. Bay Area Air Quality Management District (BAAQMD) CEQA Air Quality Guidelines, dated May 2017

3. Bay Area Air Quality Management District Final 2017 Clean Air Plan

4. Bay Area Air Quality Management District Health Risk Screening and Modeling

5. California Department of Transportation (Caltrans). California State Scenic Highway System Map.

Accessed March 2025

6. City of Newark General Plan, 2013 and General Plan Tune Up Draft EIR and Final EIR, 2013

7. Citywide Parks Master Plan, June 2017

8. City of Newark, Green Stormwater Infrastructure (GSI) Plan, September 12, 2019

9. Department of Toxic Substances Control (DTSC). EnviroStor Database

10. Resources Control Board (SWRCB). GeoTracker Database

11. Pedestrian and Bicycle Master Plan, approved by Newark City Council on February 23, 2017

12. State Responsibility Fire Hazard Severity Zone Maps, Office of the State Fire Marshall, accessed June 2023

13. FEMA FIRMette maps, FEMA, accessed April 2024

14. Tsunami Hazard Area Map, Department of Conservation, accessed April 2024

15. Sea Level Rise Viewer, National Oceanic and Atmospheric Administration (NOAA) Office of Coastal Management, accessed April 2024

16. Revised Drawings for 6756 Central CUP Application, dated January 27, 2025 City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 78

6. ENVIRONMENTAL CONDITIONS OF APPROVAL
The following conditions of approval have been identified through this analysis and ensure implementation of applicable mitigation measures and policies set forth in the General Plan and its EIR.

AES-1: All exterior lighting shall comply with all applicable regulations in NMC §17.17.060 (Lighting and Illumination) and NMC Chapter 17.23 (Parking and Loading). All exterior lighting shall be directed on-site so as not to create glare off-site, as required by the Community Development Director.

AQ-1: The following dust control measures, as recommended by the Bay Area Air Quality Management District (BAAQMD), shall be included in the design of the proposed project and implemented during construction:

1. All exposed non-paved surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and access roads) shall be watered at least two times per day and/or non-toxic soil stabilizers shall be applied to exposed non-paved surfaces.

2. All haul trucks transporting soil, sand, or other loose material off-site shall be covered and/or shall maintain at least 2 feet of freeboard.

3. All visible mud or dirt tracked out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.

4. All vehicle speeds on unpaved roads shall be limited to 15 miles per hour.

5. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.

6. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes, as required by the California Airborne Toxics Control Measure (ATCM) Title 13, Section 2485 of California Code of Regulations.

Clear signage regarding idling restrictions shall be provided for construction workers at all access points.

7. All construction equipment shall be maintained and properly tuned in accordance with the manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.

8. The prime construction contractor shall post a publicly visible sign with the telephone number and person to contact regarding dust complaints. The construction contractor shall take corrective action within 48 hours. The BAAQMD’s and the City’s phone numbers shall also be visible to ensure compliance with applicable regulations.

BIO-1: To avoid and minimize potential impacts to nesting birds including passerines and raptors, the following measures shall be implemented:

1. Grading or removal of potentially occupied habitat shall be conducted outside the nesting season, which occurs between approximately February 1 to August 31.

2. If grading between August 31 and February 1 is infeasible and groundbreaking must occur within the nesting season, a pre-construction nesting bird survey (migratory species, passerines, and raptors) of the potentially occupied habitat (trees, shrubs, grassland) shall be performed by a qualified biologist within 7 days of groundbreaking. If no nesting birds are observed no further action is required and grading shall occur within one week of the survey to prevent “take” of individual birds that could begin nesting after the survey.

3. If active bird nests (either passerine and/or raptor) are observed during the preconstruction survey, a disturbance-free buffer zone shall be established around the City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 79
occupied habitat until the young have fledged, as determined by a qualified biologist. The radius of the required buffer zone can vary depending on the species, (i.e., 75-100 feet for passerines and 200-500 feet for raptors). The dimensions of any required buffer zones shall be determined by a qualified biologist.

4. To delineate the buffer zone around the occupied habitat, construction fencing shall be placed at the specified radius from the nest within which no machinery or workers shall intrude.

5. Biological monitoring of active nests shall be conducted by a qualified biologist to ensure that nests are not disturbed and that buffers are appropriate, adjusted by a qualified biologist as needed to avoid disturbance.

6. No construction or earth-moving activity shall occur within any established nest protection buffer prior to September 1 unless it is determined by a qualified ornithologist/biologist that the young have fledged (that is, left the nest) and have attained sufficient flight skills to avoid project construction zones, or that the nesting cycle is otherwise completed.

BIO-2: Prior to any tree removal or alteration, the applicant shall obtain a tree removal permit from the City of Newark Public Works Department and implement tree planting requirements in accordance with development review.

CUL-1: During project construction, if historic, archaeological or Native American materials or artifacts are identified, work within 50-foot radius of such find shall cease and the City shall retain the services of a qualified archeologist and/or paleontologist to assess the significance of the find. adopted with the certification of the 2013 FEIR because not all impacts in the Southwest Newark Residential and Recreational Focus Area may be reduced to less than significant levels.

If such find is determined to be significant by the archeologist and/or paleontologist, a resource protection plan conforming to CEQA §15064.5 shall be prepared by the archeologist and/or paleontologist and approved by the Community Development Director. The plan may include, but would not be limited to, removal of resources and similar actions. Project work may be resumed in compliance with such plan. If human remains are encountered, all ground disturbing activities near or in any area potentially overlying adjacent human remains shall cease, the County Coroner shall be contacted immediately, and the provisions of State law carried out.

GEO-1 Prior to issuance of a building permit, the applicant shall prepare and submit a design-level geotechnical report to the City for review and implement the recommendations herein, as approved by the City.

GHG-1: COA GHG-1 The Project shall comply with the most recent CalGreen Tier 2 EV requirements for non-residential projects and show the required number of EV spaces on the plans.

HAZ-1: Prior to issuance of any demolition permit, the applicant/project developer shall provide the City of Newark with evidence of approval by the ACWD of the Media Management Plan, titled “Data Gap Investigation and request for site closure”, dated September 13, 2023, prepared by Farallon Consulting and case closure.

HYD-1: Preliminary Stormwater Treatment Plan is approved in concept only. Final approval is subject to the applicant providing, prior to the issuance of the grading permit, the necessary plans, details, and calculations that demonstrate the plan complies with the Municipal Regional Stormwater NPDES Permit (MRP), Order R2-2022-0018, revised July 1, 2022, issued to the City of Newark by the Regional Water Quality Control Board, San Francisco Bay Region.

City of Newark 6756-6792 Central Avenue Industrial Building Development Project CEQA Analysis Page 80
HYD-2: Prior to issuance of a building permit, the applicant shall prepare an Operations and Maintenance (O&M) Plan for post-construction water quality. The O&M Plan shall be reviewed and accepted by the City Engineer prior to Project Construction on the site.

NOI-1: The Applicant/Project Contractor shall implement the following noise reduction measures to minimize the impact of construction noise onto offsite receivers and demonstrate compliance to the satisfaction of the City of Newark Director of Public Works or City Engineer:

1. Construct solid plywood fences around ground level construction sites adjacent to the project property line, resulting in a decibel reduction of 5‐15 dBA.

2. ii. Equip all internal combustion engine‐driven equipment with intake and exhaust mufflers that are in good condition and appropriate for the equipment. This would provide at least a 10 dBA reduction to individual equipment noise.

3. Prohibit unnecessary idling of internal combustion engines.

4. Locate stationary noise‐generating equipment such as air compressors or portable power generators as far as possible from the project property line. Construct temporary noise barriers to screen stationary noise‐generating equipment at the project property line.

5. Utilize “quiet” air compressors and other stationary noise sources where technology exists.

6. Control noise from construction workers’ radios to a point where they are not audible at existing residences bordering the Project site.

7. Notify all adjacent businesses, residences, and other noise‐sensitive land uses of the construction schedule, in writing, and provide a written schedule of “noisy” construction activities to the adjacent land uses and nearby residences.

8. If complaints are received or excessive noise levels cannot be reduced using the measures above, erect a temporary noise control blanket barrier along surrounding building facades that face the construction sites.

9. Designate a “disturbance coordinator” who shall be responsible for responding to any complaints about construction noise. The disturbance coordinator shall determine the cause of the noise complaint (e.g., bad muffler, etc.) and shall require that reasonable measures be implemented to correct the problem. Conspicuously post a telephone number for the disturbance coordinator at the construction site and include it in the notice sent to neighbors regarding the construction schedule.

NOI-2: Prior to issuance of a demolition permit or improvements plans, the Applicant shall prepare and submit the Construction Management plan to the City’s Building Department for review and shall make any modifications to the Plan for Building to find it acceptable. The Applicant/Project’s Contractor shall implement the Project’s Construction Management Plan included in the “Acoustical Assessment”, prepared for the Project by Kimley‐Horn and Associates, Inc., December 2023.

TRAN-1: Project improvements shall include a twice per cycle left-turn phase at the northbound left-turn lane of Cherry Street and Central Avenue.

UTIL-1: Prior to the issuance of a building permit, the applicant shall pay the applicable impact fees, in the amount in effect at the time.

Memorandum
Date: July 19, 2024
To: Ryan Marshall, Director of Development, Prologis
From: Philip Ault, Director of Noise and Air Quality, FirstCarbon Solutions Tsui Li, Senior Air Quality Scientist
Subject: Air Quality, Greenhouse Gas Emissions and Energy Technical Analysis for the 6756 Central Avenue Warehouse Project, City of Newark, Alameda County, California At the request of Prologis (project applicant), FirstCarbon Solutions (FCS) prepared this memorandum to summarize the findings of the air quality, greenhouse gas (GHG) emissions, and energy analyses prepared for the proposed 6756 Central Avenue Warehouse Project (proposed project). The project site is located at 6756 Central Avenue, at the intersection of Central Avenue and Sycamore Street, in the City of Newark (City), Alameda County (County), California (Exhibit 1). The project site consists of Assessor’s Parcel Numbers (APNs) 092A-2165-014, -015, -016, and -017. The project site is currently occupied by an industrial building and is bound by a Union Pacific Railroad line, a railroad lay-down area utilized by Altamont Express, industrial and warehouse uses surrounding the project site, and single-family residential uses further northeast and further northwest (Exhibit 2).

RECOMMENDATIONS TO AVOID OR MINIMIZE POTENTIAL PROJECT-RELATED IMPACTS TO SENSITIVE RECEPTORS IN THE PROJECT VICINITY ARE INCLUDED IN THIS MEMORANDUM AS APPROPRIATE.

PROJECT UNDERSTANDING
The overall project site is 17.4 acres. The project applicant proposes to demolish 113,500 square feet of industrial building and 545,679 square feet of hardscape and to construct a 315,390-square-foot building with 281,583 square feet dedicated to industrial/warehouse uses and an additional 33,806 square feet for office uses (Exhibit 3). The proposed project would provide a total of 85,022 square feet of landscaping, including 31,341 square feet of bioretention area.

The proposed project would provide a total of 401 vehicle parking spaces. Ten of the proposed parking spaces would be accessible parking, 95 spaces would be for compact-sized vehicles, and 291 spaces would be standard parking. Parking would be provided throughout the project site, located primarily on the setback between the building and Central Avenue but also dispersed on the northeast, southwest, and southeast project boundaries. In addition, the proposed project would provide 34 total bicycle parking spaces. Fourteen of the bicycle spaces would be for long-term storage, and 20 bicycle spaces would be for short-term parking.
82 35
9 84
85 Alameda County
Santa Clara County
Contra Costa County
Alameda County
92 84
880
80 680
237
101
280
84 Los Vaqueros
Reservoir
580
San Franc si co
Coun
yt
A
al meda
County
580
880
San Mateo
Foster City
Newark
Fremont
Milpitas
Belmont
San Carlos
Redwood City
North
Fair Oaks Menlo Park
East Palo
Alto
Stanford
Palo Alto Mountain View
Sunnyvale
Santa Clara Los Altos
Saratoga
Campbell
San Jose
Santa Clara
Los Gatos
Danville
San Ramon
Dublin
Pleasanton
Livermore
Castro Valley
Hayward
Union City
Calaveras
Reservoir
San Antonio
Reservoir
Alameda County
San Mateo County
Exh ib it1
R e g iona lLoca tion Ma p
5 2.5 0 5
Miles
Text
Project Site
Source :Ce nsus2000Da ta ,The Ca lifornia Spa tia lInform a tion Lib ra ry(Ca SIL). 25700013•05/2024|1_R e g iona l_Loca tion.m xd
Project Site
Legend
City of Newark

CITYOFNEWAR K
6756CENTR ALAVENUEINDUSTR IALPR OJECT

AIR QUALITY,GR EENHOUSEGASEMISSIONS,ANDENER GYTECHNICALMEMOR ANDUM 25700013•05/2024| 2_local_vicinity.m xd
Exhibit2
LocalVicinityMap
S ource:Bing AerialIm ag ery.
1,000 500 0 1,000
Feet
Legend
Project Site

CITYOFNEWARK
6756CENTRALAVENUEINDUS TRIALPROJECT

AIRQUALITY,GREENHOUS EGAS EMIS S IONS ,ANDENERGYTECHNICALMEMORANDUM 25700013 • 05/2024 | 3_Site_Plan.cdr
Exhibit 3
Site Plan

CITY OF NEWARK
6756 CENTRAL AVENUE INDUSTRIAL PROJECT

AIR QUALITY, GREENHOUSE GAS EMISSIONS, AND ENERGY TECHNICAL MEMORANDUM Source: Jackson Liles Architecture; Prologis., 01/12/2024.

Ryan Marshall
July 19, 2024

Page 5 ends