0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centerline Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Newport CTR
Job Number: 8211
Road Segment: North of Coast Highway
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 16,400 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,640 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tmcks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
No Source Elevations (in feet)
Centerline Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel BarrierAtten Berm Allen
Autos:
68.46 -0.43
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 0.20
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -17.67
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -17.04
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -21.62
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks:
84.25 -21.00
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
62.7 60.8
59.1 53.0
61.6 62.2
Autos.,
63.3 61.4
59.7 53.6
62.2 62.9
Medium Trucks:
56.5 55.0
48.6 47.1
55.5 55.8
Medium Trucks:
57.1 55.6
49.2 47.7
56.1 56.4
Heavy Trucks.
57.3 55.9
46.9 48.1
56.5 56.6
Heavy Trucks.
57.9 56.5
47.5 48.7
57.1 57.2
Vehicle Noise:
64.6 62.8
59.7 55.0
63.5 64.0
Vehicle Noise:
65.2 63.4
60.3 55.6
64.2 64.6
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
37 80
172
370
Ldn:
41 88
189
407
CNEL:
40 86
184
397
CNEL:
44 94
203
437
Tuesday, May 29, 2012
6.1-61
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Rosa
Job Numbe, 8211
Road Segment: North of San Joaquin Hills
SITE SPECIFIC INPUT
DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
3,800 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
380 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMELI
TraMc Flow I Distance
Finite Road Fresnel Bard rAtfim I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Rosa
Job Number: 8211
Road Segment: South of San Joaquin Hills
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 16,800
vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,680 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType I REMEL I
TmMc Flow Distance
Finite Road Fresnel BarderAtten I Berm Allen
Autos:
68.46 -6.15
-4.39
-1.20 -4.87
0.000
0.000
Autos:
68.46 0.30
-4.39
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -23.39
-4.39
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -16.94
-4.39
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -27.35
-4.39
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -20.89
-4.39
-1.20 -5.16
0.000
0.000
Unmitigated Notse Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Lon
CNEL
Autos.,
56.7 54.8
53.0 47.0
55.6 56.2
Autos.,
63.2 61.3
59.5 53.4
62.1 62.7
Medium Trucks:
50.5 49.0
42.6 41.1
49.5 49.7
Medium Trucks:
56.9 55.4
49.1 47.5
56.0 56.2
Heavy Trucks:
51.3 49.9
40.9 42.1
50.5 50.6
Heavy Trucks:
57.8 56.3
47.3 48.6
56.9 57.0
Vehicle Noise:
58.5 56.8
53.7 49.0
57.5 58.0
Vehicle Noise:
65.0 63.3
60.1 55.4
64.0 64.4
Centeriine Distance to Noise Contour (in feet)
Centeriine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
15 32
68 147
Ldn:
40 85
184
397
CNEL:
16 34
73 158
CNEL:
43 92
197
425
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Rosa
Job Number 8211
Road Segment: North of Newport CTR
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Trafc (Adt): 14,300
vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,430 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel Be Bem1 Allen
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Rosa
Job Number: 8211
Road Segment: South of Newport CTR
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
7,900 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
790 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Autos:
68.46 -0.40
-4.39
-1.20 -4.87
0.000
0.000
Autos:
68.46 -2.97
-4.39
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -17.64
-4.39
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -20.21
-4.39
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -21.59
-4.39
-1.20 -5.16
0.000
0.000
Heavy Trucks:
84.25 -24.17
-4.39
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
62.5 60.6
58.8 52.7
61.4 62.0
Autos.,
59.9 58.0
56.2 50.2
58.8 59.4
Medium Trucks:
56.2 54.7
48.4 46.8
55.3 55.5
Medium Trucks:
53.6 52.1
45.8 44.2
52.7 52.9
Heavy Trucks:
57.1 55.6
46.6 47.9
56.2 56.3
Heavy Trucks:
54.5 53.1
44.0 45.3
53.6 53.8
Vehicle Noise:
64.3 62.6
59.4 54.7
63.3 63.7
Vehicle Noise:
61.7 60.0
56.8 52.2
60.7 61.2
Centeriine Distance to Noise Contour (in feet)
Centeriine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
36 77
165
356
Ldn:
24 52
ill
240
CNEL:
38 82
177
382
CNEL:
26 55
119
257
Tuesday, May 29, 2012
6.1-62
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Avocado
Job Numbe, 8211
Road Segment: North of San Miguel
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
5,000 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
500 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centedine Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType REMELI
TraMc Flow I Distance
Finite Road Fresnel BardarAtfen I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Avocado
Job Number. 8211
Road Segment: South of San Miguel
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
15,500 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,550 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centedine Dist. to Berner.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType I REMEL I
Traffic Flow Distance
Finite Road Fresnel BarderAtten I Berm Allen
Autos:
66.51 -4.45
-4.51
-1.20 -4.87
0.000
0.000
Autos:
66.51 0.46
-4.51
-1.20 -4.87
0.000
0.000
Medium Trucks:
77.72 -21.69
-4.51
-1.20 -4.97
0.000
0.000
Medium Trucks:
77.72 -16.77
-4.51
-1.20 -4.97
0.000
0.000
Heavy Trucks:
82.99 -25.64
-4.51
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
82.99 -20.73
-4.51
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Lon
CNEL
Autos.,
56.3 54.4
52.7 46.6
55.2 55.9
Autos.,
61.3 59.4
57.6 51.5
60.2 60.8
Medium Trucks:
50.3 48.8
42.4 40.9
49.4 49.6
Medium Trucks:
55.2 53.7
47.4 45.8
54.3 54.5
Heavy Trucks.
51.6 50.2
41.2 42.4
50.8 50.9
Heavy Trucks.
56.5 55.1
46.1 47.3
55.7 55.8
Vehicle Noise:
58.4 56.6
53.3 48.8
57.3 57.8
Vehicle Noise:
63.3 61.5
58.3 53.7
62.2 62.7
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
14 31
66 143
Ldn:
30 66
141
304
CNEL:
15 33
71 153
CNEL:
33 70
151
326
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Avocado
Job Number 8211
Road Segment: North of Coast Highway
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 11,000 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,100 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tmcks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centedine Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Macerthur
Job Number: 8211
Road Segment North of Bonita Canyon
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 80,500 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
8,050 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tmcks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centedine Dist. to Berner.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel BarrierAtten Berm Allen
Autos:
66.51 -1.03
-4.51
-1.20 -4.87
0.000
0.000
Autos:
68.46 7.11
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
77.72 -18.26
-4.51
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -10.13
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks:
82.99 -22.22
-4.51
-1.20 -5.16
0.000
0.000
Heavy Trucks:
84.25 -14.09
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
59.8 57.9
56.1 50.1
58.7 59.3
Autos.,
70.3 68.4
66.6 60.5
69.2 69.8
Medium Trucks:
53.7 52.2
45.9 44.3
52.8 53.0
Medium Trucks:
64.0 62.5
56.1 54.6
63.1 63.3
Heavy Trucks.
55.1 53.6
44.6 45.9
54.2 54.3
Heavy Trucks.
64.9 63.4
54.4 55.6
64.0 64.1
Vehicle Noise:
61.8 60.0
56.8 52.2
60.8 61.2
Vehicle Noise:
72.1 70.3
67.2 62.5
71.1 71.5
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
24 52
112
242
Ldn:
118
254
546
1,177
CNEL:
26 56
120
259
CNEL:
126
272
586
1,262
Tuesday, May 29, 2012
6.1-63
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Macarthur
Job Numbe, 8211
Road Segment: South of Bonita
Canyon
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
69,200 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
6,920 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMELI
TmMc Flow I Distance
Finite Road Fresnel BerrierAtten I Bemr Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Macarthur
Job Number: 8211
Road Segment: North of San Joaquin Hills
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt): 68,100 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
6,810 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType I REMEL I
TmMc Flow Distance
Finite Road Fresnel BerrierAtten I Berm Allen
Autos.
68.46 6.45
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 6.38
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -10.79
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -10.86
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks.,
84.25 -14.74
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -14.81
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Toper and harrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
69.6 67.7
65.9 59.9
68.5 69.1
Autos.,
69.5 67.6
65.9 59.8
68.4 69.0
Medium Trucks:
63.3 61.8
55.5 53.9
62.4 62.6
Medium Trucks:
63.3 61.8
55.4 53.9
62.3 62.6
Heavy Trucks:
64.2 62.8
53.7 55.0
63.3 63.5
Heavy Trucks:
64A
62.7 53.7
54.9 63.3
63.4 Vehicle Noise:
71.4 69.7
66.5 61.9
70.4 70.9
Vehicle Noise:
71.4 69.6
66.5 61.8
70.3 70.8
Centedine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
106
229
494
1,064
Ldn:
105
227
489
1,053
CNEL:
114
246
530
1,141
CNEL:
113
243
524
1,129
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Macarthur
Job Number 8211
Road Segment: South of San Joaquin Hills
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt): 43,400 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
4,340 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer,
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Macarthur
Job Numbe, 8211
Road Segment: North of San Miguel
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt): 38,800 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
3,880 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel BerrierAtten Bemr Allen
Autos:
68.46 4.42
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 3.94
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -12.81
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -13.30
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -16.77
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -17.26
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Toper and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
67.6 65.7
63.9 57.9
66.5 67.1
Autos.,
67.1 65.2
63.4 57.4
66.0 66.6
Medium Trucks:
61.3 59.8
53.5 51.9
60.4 60.6
Medium Trucks:
60.8 59.3
53.0 51.4
59.9 60.1
Heavy Trucks:
62.2 60.7
51.7 53.0
61.3 61.4
Heavy Trucks:
61.7 60.3
51.2 52.5
60.8 61.0
Vehicle Noise:
69.4 67.7
64.5 59.8
68.4 68.8
Vehicle Noise:
68.9 67.2
64.0 59.3
67.9 68.3
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dRA
Ldn:
78 168
362
779
Ldn:
72 156
336
723
CNEL:
84 180
388
836
CNEL:
78 167
360
776
Tuesday, May 29, 2012
6.1-64
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Macarthur
Job Number 8211
Road Segment: South of San Miguel
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 32,400 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
3,240 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMELI
Treffic Flow I Distance
Finite Road Fresnel Bard rAffen I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Macarthur
Job Number 8211
Road Segment: North of Coast Highway
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 32,500 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
3,250 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType I REMEL I
Traffic Flow Distance
Finite Road Fresnel BarderAffen I Bann Allen
Autos.
68.46 3.15
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 3.17
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -14.08
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -14.07
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks.,
84.25 -18.04
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -18.03
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leg Peak Hour I
Leg Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leg Peak Hour I
Leg Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
66.3 64.4
62.6 56.6
65.2 65.8
Autos.,
66.3 64.4
62.6 56.6
65.2 65.8
Medium Trucks:
60.1 58.5
52.2 50.6
59.1 59.3
Medium Trucks:
60.1 58.6
52.2 50.7
59.1 59.3
Heavy Trucks:
60.9 59.5
50.4 51.7
60.0 60.2
Heavy Trucks:
60.9 59.5
50.5 51.7
60.1 60.2
Vehicle Noise:
68.1 66.4
63.2 58.6
67.1 67.6
Vehicle Noise:
68.1 66.4
63.3 58.6
67.1 67.6
Centedine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
64 138
298
641
Ldn:
64 138
298
643
CNEL:
69 148
319
688
CNEL:
69 149
320
690
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Eastbluff/Ford/Bonita
Cyn
Job Number 8211
Road Segment: Westof Jamboree
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
15,300 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,530 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tmcks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer,
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Tmcks: 96.566
Right View:
90.0 degrees
Heavy Tmcks: 96.608
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel Be Bem1 Allen
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Eastbluff/Ford/Bonita
Cyn
Job Number: 8211
Road Segment: East of Jamboree
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
12,300 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,230 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tmcks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Tmcks: 96.566
Right View:
90.0 degrees
Heavy Tmcks: 96.608
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel BarrierAffen Bem1 Allen
Autos:
68.46 -0.10
-4.39
-1.20 -4.87
0.000
0.000
Autos:
68.46 -1.05
-4.39
-1.20 -4.87
0.000
0.000
Medium Tmcks:
79.45 -17.34
-4.39
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -18.29
-4.39
-1.20 -4.97
0.000
0.000
Heavy Tmcks:
84.25 -21.30
-4.39
-1.20 -5.16
0.000
0.000
Heavy Tmcks.,
84.25 -22.25
-4.39
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leg Peak Hour
Leg Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Lag Peak Hour I
Leg Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
62.8 60.9
59.1 53.0
61.7 62.3
Autos.,
61.8 59.9
58.1 52.1
60.7 61.3
Medium Trucks:
56.5 55.0
48.6 47.1
55.6 55.8
Medium Trucks:
55.6 54.1
47.7 46.2
54.6 54.8
Heavy Tmcks:
57.4 55.9
46.9 48.2
56.5 56.6
Heavy Tmcks:
56.4 55.0
46.0 47.2
55.6 55.7
Vehicle Noise:
64.6 62.9
59.7 55.0
63.6 64.0
Vehicle Noise:
63.6 61.9
58.8 54.1
62.6 63.1
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
37 80
173
373
Ldn:
32 69
150
322
CNEL:
40 86
186
400
CNEL:
35 74
160
346
Tuesday, May 29, 2012
6.1-65
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Eastbluff/Ford/Bonita
Cyn
Job Numbe, 8211
Road Segment: West of Bonita Canyon
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
10,600 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,060 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMELI
TmMc Flow I Distance
Finite Road Fresnel Bard rAtfim I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Eastbluff/Ford/Bonita
Cyn
Jab Number: 8211
Road Segment: East of Bonita Canyon
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
39,400 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
3,940 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barney.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType I REMEL
I TmMc Flow Distance
Finite Road Fresnel BarderAtten I Berm Allen
Autos.
68.46 -1.70
-4.39
-1.20 -4.87
0.000
0.000
Autos:
68.46 4.00
-4.39
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -18.94
-4.39
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -13.23
-4.39
-1.20 -4.97
0.000
0.000
Heavy Trucks.,
84.25 -22.89
-4.39
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -17.19
-4.39
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
61.2 59.3
57.5 51.4
60.1 60.7
Autos.,
66.9 65.0
63.2 57.2
65.8 66.4
Medium Trucks:
54.9 53.4
47.1 45.5
54.0 54.2
Medium Trucks:
60.6 59.1
52.8 51.2
59.7 59.9
Heavy Trucks:
55.8 54.3
45.3 46.6
54.9 55.0
Heavy Trucks:
61.5 60.0
51.0 52.3
60.6 60.7
Vehicle Noise:
63.0 61.3
58.1 53.4
62.0 62.4
Vehicle Noise:
68.7 67.0
63.8 59.1
67.7 68.1
Centedine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
7o dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
29 63
135
292
Ldn:
70 151
325
700
CNEL:
31 67
145
313
CNEL:
75 162
349
751
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Joaquin
Hills
Job Number: 8211
Road Segment: Westof Jamboree
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Tmftic (Adt):
5,000 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
500 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Joaquin
Hills
Jab Number: 8211
Road Segment: Eastof Jamboree
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
20,400 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
2,040 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barney.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Autos:
68.46 -4.96
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 1.15
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -22.20
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -16.09
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -26.16
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -20.05
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
58.2 56.3
54.5 48.5
57.1 57.7
Autos.,
64.3 62.4
60.6 54.6
63.2 63.8
Medium Trucks:
51.9 50.4
44.1 42.5
51.0 51.2
Medium Trucks:
58.0 56.5
50.2 48.6
57.1 57.3
Heavy Trucks:
52.8 51.4
42.3 43.6
51.9 52.1
Heavy Trucks:
58.9 57.5
48.4 49.7
58.0 58.2
Vehicle Noise:
60.0 58.3
55.1 50.4
59.0 59.4
Vehicle Noise:
66.1 64.4
61.2 56.6
65.1 65.6
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
18 40
86 185
Ldn:
47 102
219
471
CNEL:
20 43
92 198
CNEL:
51 109
235
505
Tuesday, May 29, 2012
6.1-66
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Joaquin
Hills
Jab Number: 8211
Road Segment: West of Santa Cruz
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Tmllic (Adt):
23,700 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
2,370 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise S- Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMELI
TraMc Flow I Distance
Finite Road Fresnel SarnerAtten I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Joaquin
Hills
Job Number 8211
Road Segment: East of Santa Cruz
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
15,000 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,500 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType I REMEL I
Traffic Flow Distance
Finite Road Fresnel SarnerAtten I Berm Allen
Autos.
68.46 1.80
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 -0.19
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -15.44
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -17.43
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks.,
84.25 -19.40
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -21.38
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLoq
Evening
Leq Night
Ldn
CNEL
Autos.,
64.9 63.0
61.3 55.2
63.8 64.5
Autos.,
63.0 61.1
59.3 53.2
61.9 62.5
Medium Trucks:
58.7 57.2
50.8 49.3
57.7 58.0
Medium Trucks:
56.7 55.2
48.8 47.3
55.8 56.0
Heavy Trucks:
59.5 58.1
49.1 50.3
58.7 58.8
Heavy Trucks:
57.6 56.1
47.1 48.3
56.7 56.8
Vehicle Noise:
66.8 65.0
61.9 57.2
65.7 66.2
Vehicle Noise:
64.8 63.0
59.9 55.2
63.8 64.2
Centedine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
52 112
242
521
Ldn:
38 83
178
384
CNEL:
56 120
259
559
CNEL:
41 89
191
412
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Joaquin
Hills
Job Number 8211
Road Segment: West of Santa Rosa
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Tmllic (Adt):
17,300 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,730 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer,
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Joaquin
Hills
Jab Number: 8211
Road Segment: East of Santa Rosa
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
22,900 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
2,290 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height(Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel Semi Bem1 Allen
Autos:
68.46 0.43
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 1.65
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -16.81
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -15.59
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -20.76
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -19.55
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
63.6 61.7
59.9 53.9
62.5 63.1
Autos.,
64.8 62.9
61.1 55.1
63.7 64.3
Medium Trucks:
57.3 55.8
49.5 47.9
56.4 56.6
Medium Trucks:
58.5 57.0
50.7 49.1
57.6 57.8
Heavy Trucks:
58.2 56.8
47.7 49.0
57.3 57.4
Heavy Trucks:
59.4 58.0
48.9 50.2
58.5 58.7
Vehicle Noise:
65.4 63.7
60.5 55.8
64.4 64.8
Vehicle Noise:
66.6 64.9
61.7 57.1
65.6 66.1
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
I
7o deA
65 dBA
60 dBA
55 dBA
Ldn:
42 91
196
422
Ldn:
51 110
236
509
CNEL:
45 98
210
453
CNEL:
55 118
253
546
Tuesday, May 29, 2012
6.1-67
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Joaquin Hills
Jab Number: 8211
Road Segment: Westof Macarthur
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Tmilic (Adt): 23,600 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
2,360 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier
100.0 feet
Noise S- Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right Vie-
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMELI
Tmfrc Flow I Distance
Finite Road Fresnel SarnierAtten I Berm Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Joaquin
Hills
Jab Number: 8211
Road Segment: Eastof Macarthur
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
21,300 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
2,130 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feel)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0 %
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType I REMEL
I Traffic Flow Distance
Finite Road Fresnel SarnierAtten I Berm Allen
Autos.
68.46 1.78
-4.11
-1.20 -4.87
0.000
0.000
Autos.
68.46 1.33
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -15.46
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -15.91
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks.,
84.25 -19.42
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -19.86
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
64.9 63.0
61.3 55.2
63.8 64.4
Autos.,
64.5 62.6
60.8 54.8
63.4 64.0
Medium Trucks:
58.7 57.2
50.8 49.3
57.7 58.0
Medium Trucks:
58.2 56.7
50.4 48.8
57.3 57.5
Heavy Trucks:
59.5 58.1
49.1 50.3
58.7 58.8
Heavy Trucks:
59.1 57.7
48.6 49.9
58.2 58.4
Vehicle Noise:
66.8 65.0
61.9 57.2
65.7 66.2
Vehicle Noise:
66.3 64.6
61.4 56.7
65.3 65.7
Centedine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
52 112
241
519
Ldn:
48 104
225
485
CNEL:
56 120
259
557
CNEL:
52 112
241
520
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Clemente
Job Number: 8211
Road Segment: East of Santa Barbara
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
5,700 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
570 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tracks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0 %
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Clemente
Job Number: 8211
Road Segment: West of Santa Cruz
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Tmilic (Adt):
5,900 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
590 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tracks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height(Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feel)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0 %
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel Semi Berm Allen
Autos.
66.51 -3.88
-4.51
-1.20 -4.87
0.000
0.000
Autos.
66.51 -3.73
-4.51
-1.20 -4.87
0.000
0.000
Medium Trucks:
77.72 -21.12
-4.51
-1.20 -4.97
0.000
0.000
Medium Trucks:
77.72 -20.97
-4.51
-1.20 -4.97
0.000
0.000
Heavy Trucks:
82.99 -25.07
-4.51
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
82.99 -24.93
-4.51
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
56.9 55.0
53.3 47.2
55.8 56.4
Autos.,
57.1 55.2
53.4 47.3
56.0 56.6
Medium Trucks:
50.9 49.4
43.0 41.5
49.9 50.2
Medium Trucks:
51.0 49.5
43.2 41.6
50.1 50.3
Heavy Trucks:
52.2 50.8
41.7 43.0
51.4 51.5
Heavy Trucks:
52.4 50.9
41.9 43.1
51.5 51.6
Vehicle Noise:
58.9 57.2
53.9 49.4
57.9 58.3
Vehicle Noise:
59.1 57.3
54.1 49.5
58.1 58.5
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
7o dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
16 34
72 156
Ldn:
16 34
74 160
CNEL:
17 36
78 167
CNEL:
17 37
79 171
Tuesday, May 29, 2012
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Barbara
Job Numbe, 8211
Road Segment: Westof Jamboree
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
2,300 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
230 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(O-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType REMELI
TraMc Flow I Distance
Finite Road Fresnel BerrierAtten I Bemr Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Barbara
Job Numbe, 8211
Road Segment: East of Jamboree
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
12,900 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,290 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(O-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0 %
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType I REMEL I
TmMc Flow Distance
Finite Road Fresnel BerrierAtten I Berm Allen
Autos:
66.51 -7.82
-4.51
-1.20 -4.87
0.000
0.000
Autos:
66.51 -0.33
-4.51
-1.20 -4.87
0.000
0.000
Medium Trucks:
77.72 -25.06
-4.51
-1.20 -4.97
0.000
0.000
Medium Trucks:
77.72 -17.57
-4.51
-1.20 -4.97
0.000
0.000
Heavy Trucks:
82.99 -29.02
-4.51
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
82.99 -21.53
-4.51
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
53.0 51.1
49.3 43.3
51.9 52.5
Autos.,
60.5 58.6
56.8 50.7
59.4 60.0
Medium Trucks:
46.9 45.4
39.1 37.5
46.0 46.2
Medium Trucks:
54.4 52.9
46.6 45.0
53.5 53.7
Heavy Trucks:
48.3 46.8
37.8 39.1
47.4 47.5
Heavy Trucks:
55.8 54.3
45.3 46.5
54.9 55.0
Vehicle Noise:
55.0 53.3
50.0 45.4
54.0 54.4
Vehicle Noise:
62.5 60.7
57.5 52.9
61.4 61.9
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
9 18
40 85
Ldn:
27 58
125
269
CNEL:
9 20
42 91
CNEL:
29 62
134
288
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Barbara
Job Number 8211
Road Segment North of San Clemente
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt): 12,600
vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,260 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(O-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0 %
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType REMEL
TmMc Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Barbara
Job Number: 8211
Road Segment: South of San Clemente
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt):
7,900 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
790 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(O-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0 %
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType REMEL
TreMc Flow Distance
Finite Road Fresnel BerrierAtten Bemr Allen
Autos:
66.51 -0.44
-4.51
-1.20 -4.87
0.000
0.000
Autos:
66.51 -2.46
-4.51
-1.20 -4.87
0.000
0.000
Medium Trucks:
77.72 -17.67
-4.51
-1.20 -4.97
0.000
0.000
Medium Trucks:
77.72 -19.70
-4.51
-1.20 -4.97
0.000
0.000
Heavy Trucks:
82.99 -21.63
-4.51
-1.20 -5.16
0.000
0.000
Heavy Trucks:
82.99 -23.66
-4.51
-1.20 -5.16
0.000
0.000
UnV.gated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
60.4 58.5
56.7 50.6
59.3 59.9
Autos.,
58.3 56.4
54.7 48.6
57.2 57.8
Medium Trucks:
54.3 52.8
46.5 44.9
53.4 53.6
Medium Trucks:
52.3 50.8
44.4 42.9
51.3 51.6
Heavy Trucks:
55.6 54.2
45.2 46.4
54.8 54.9
Heavy Trucks:
53.6 52.2
43.2 44.4
52.8 52.9
Vehicle Noise:
62.4 60.6
57.4 52.8
61.3 61.8
Vehicle Noise:
60.3 58.6
55.3 50.8
59.3 59.8
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
7o dBA
65 dBA
60 dBA
55 dBA
I
7o deA
65 dBA
60 dBA
55 dBA
Ldn:
26 57
123
265
Ldn:
19 42
90 194
CNEL:
28 61
132
284
CNEL:
21 45
96 208
Tuesday, May 29, 2012
6.1-69
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Barbara
Job Numbe, 8211
Road Segment: West of Newport CTR
SITE SPECIFIC INPUT
DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
6,900 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
690 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType REMELI
TraMc Flow I Distance
Finite Road Fresnel Bard rAtfim I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Santa Barbara
Job Numbe, 8211
Road Segment: East of Newport CTR
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
3,700 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
370 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
40 mph
Vehicle Mix
Near/Far Lane Distance:
36 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 98.412
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 98.372
Right View:
90.0 degrees
Heavy Trucks: 98.413
FHWA Noise Model Calculations
VehicleType I REMEL I
TreMc Flow Distance
Finite Road Fresnel BarderAtten I Berm Allen
Autos:
66.51 -3.05
-4.51
-1.20 -4.87
0.000
0.000
Autos:
66.51 -5.76
-4.51
-1.20 -4.87
0.000
0.000
Medium Trucks:
77.72 -20.29
-4.51
-1.20 -4.97
0.000
0.000
Medium Trucks:
77.72 -23.00
-4.51
-1.20 -4.97
0.000
0.000
Heavy Trucks:
82.99 -24.25
-4.51
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
82.99 -26.95
-4.51
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Lon
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Lon
CNEL
Autos.,
57.7 55.8
54.1 48.0
56.6 57.3
Autos.,
55.0 53.1
51.4 45.3
53.9 54.5
Medium Trucks:
51.7 50.2
43.8 42.3
50.8 51.0
Medium Trucks:
49.0 47.5
41.1 39.6
48.1 48.3
Heavy Trucks.
53.0 51.6
42.6 43.8
52.2 52.3
Heavy Trucks.
50.3 48.9
39.9 41.1
49.5 49.6
Vehicle Noise:
59.8 58.0
54.7 50.2
58.7 59.2
Vehicle Noise:
57.0 55.3
52.0 47.5
56.0 56.5
Centerfine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
18 38
82 177
Ldn:
12 25
54 117
CNEL:
19 41
88 190
CNEL:
13 27
58 125
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Miguel
Job Number 8211
Road Segment: West of Newport CTR
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
9,100 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
910 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tmcks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment.: 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMEL
TreMc Flow Distance
Finite Road Fresnel Be Bem1 Allen
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Miguel
Job Number: 8211
Road Segment: East of Newport CTR
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 14,400
vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,440 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tmcks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment., 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMEL
TreMc Flow Distance
Finite Road Fresnel BarrierAtten Berm Allen
Autos:
68.46 -2.36
-4.39
-1.20 -4.87
0.000
0.000
Autos:
68.46 -0.37
-4.39
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -19.60
-4.39
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -17.61
-4.39
-1.20 -4.97
0.000
0.000
Heavy Tmcks:
84.25 -23.55
-4.39
-1.20 -5.16
0.000
0.000
Heavy Trucks:
84.25 -21.56
-4.39
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
60.5 58.6
56.8 50.8
59.4 60.0
Autos.,
62.5 60.6
58.8 52.8
61.4 62.0
Medium Trucks:
54.3 52.8
46.4 44.8
53.3 53.5
Medium Trucks:
56.3 54.7
48.4 46.8
55.3 55.5
Heavy Trucks.
55.1 53.7
44.6 45.9
54.3 54.4
Heavy Trucks.
57.1 55.7
46.6 47.9
56.2 56.4
Vehicle Noise:
62.3 60.6
57.4 52.8
61.3 61.8
Vehicle Noise:
64.3 62.6
59.4 54.8
63.3 63.8
Centedine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
7o dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
26 57
122
264
Ldn:
36 77
166
358
CNEL:
28 61
131
283
CNEL:
38 83
178
384
Tuesday, May 29, 2012
6.1-70
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Miguel
Job Numbe, 8211
Road Segment: Westof Avacado
SITE SPECIFIC INPUT
DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt): 18,100
vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,810 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Sourae Elevations (in feet)
Centerline Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMELI
TreMc Flow I Distance
Finite Road Fresnel Bard rAtfim I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Miguel
Jab Number: 8211
Road Segment: East of Avacado
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt): 26,800 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
2,680 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barney.
100.0 feet
Noise Source Elevations (in feet)
Centerline Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType I REMEL I
Traffic Flow Distance
Finite Road Fresnel BarderAtten I Berm Allen
Autos.
68.46 0.63
-4.39
-1.20 -4.87
0.000
0.000
Autos:
68.46 2.33
-4.39
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -16.61
-4.39
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -14.91
-4.39
-1.20 -4.97
0.000
0.000
Heavy Trucks.,
84.25 -20.57
-4.39
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -18.86
-4.39
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
63.5 61.6
59.8 53.8
62.4 63.0
Autos.,
65.2 63.3
61.5 55.5
64.1 64.7
Medium Trucks:
57.2 55.7
49.4 47.8
56.3 56.5
Medium Trucks:
59.0 57.4
51.1 49.5
58.0 58.2
Heavy Trucks:
58.1 56.7
47.6 48.9
57.2 57.4
Heavy Trucks:
59.8 58.4
49.3 50.6
58.9 59.1
Vehicle Noise:
65.3 63.6
60.4 55.8
64.3 64.8
Vehicle Noise:
67.0 65.3
62.1 57.5
66.0 66.5
Centerfine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
42 90
193
417
Ldn:
54 117
251
541
CNEL:
45 96
208
447
CNEL:
58 125
270
581
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Miguel
Job Number: 8211
Road Segment: Westof Macarthur
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt): 25,000 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
2,500 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centerline Dist. to Observer,
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel Be Bem1 Allen
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: San Miguel
Job Number: 8211
Road Segment: Eastof Macarthur
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TmMc (Adt): 12,500
vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
1,250 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
52 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks., 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barney.
100.0 feet
No Source Elevations (in feet)
Centerline Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height(Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 96.607
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 96.566
Right View:
90.0 degrees
Heavy Trucks: 96.608
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel BarrierAtten Berm Allen
Autos:
68.46 2.03
-4.39
-1.20 -4.87
0.000
0.000
Autos:
68.46 -0.98
-4.39
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -15.21
-4.39
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -18.22
-4.39
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -19.17
-4.39
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -22.18
-4.39
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
64.9 63.0
61.2 55.2
63.8 64.4
Autos.,
61.9 60.0
58.2 52.2
60.8 61.4
Medium Trucks:
58.6 57.1
50.8 49.2
57.7 57.9
Medium Trucks:
55.6 54.1
47.8 46.2
54.7 54.9
Heavy Trucks:
59.5 58.1
49.0 50.3
58.6 58.8
Heavy Trucks:
56.5 55.1
46.0 47.3
55.6 55.8
Vehicle Noise:
66.7 65.0
61.8 57.2
65.7 66.2
Vehicle Noise:
63.7 62.0
58.8 54.1
62.7 63.1
Centedine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
7o dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 deA
Ldn:
52 ill
240
517
Ldn:
33 70
151
326
CNEL:
55 119
257
555
CNEL:
35 75
162
349
Tuesday, May 29, 2012
6.1-71
Tuesday, May M, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Coast Highway
Job Numbe, 8211
Road Segment: Westof Jamboree
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TreMc (Adt):
71,600 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
7,160 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barrier
100.0 feet
Noise Source Elevations (in feet)
Centerline Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMELI
TraMc Flow I Distance
Finite Road Fresnel BandarAtten I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Coast Highway
Job Numbe, 8211
Road Segment: East of Jamboree
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TreMc (Adt):
58,300 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
5,830 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barney.
100.0 feet
Noise Source Elevations (in feet)
Centerline Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType I REMEL
I TreMc Flow Distance
Finite Road Fresnel BanderAtten I Berm Allen
Autos:
68.46 6.60
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 5.71
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -10.64
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -11.53
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks.,
84.25 -14.60
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -15.49
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
69.7 67.8
66.1 60.0
68.6 69.3
Autos.,
68.9 67.0
65.2 59.1
67.8 68.4
Medium Trucks:
63.5 62.0
55.6 54.1
62.5 62.8
Medium Trucks:
62.6 61.1
54.7 53.2
61.7 61.9
Heavy Trucks:
64.3 62.9
53.9 55.1
63.5 63.6
Heavy Trucks:
63.4 62.0
53.0 54.2
62.6 62.7
Vehicle Noise:
71.6 69.8
66.7 62.0
70.6 71.0
Vehicle Noise:
70.7 68.9
65.8 61.1
69.7 70.1
Centedine Distance to Noise Contour (in feet)
Centerfine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
1 70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
109
234
505
1,088
Ldn:
95 204
440
949
CNEL:
117
252
542
1,167
CNEL:
102
219
472
1,018
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Coast Highway
Job Number: 8211
Road Segment: West of Newport CTR
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TraOic (Adt):
54,100 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
5,410 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tracks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barter
100.0 feet
Noise Source Elevations (in feet)
Centerline Dist. to Observer,
100.0 feet
Autos: 2.000
Barter Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TreMc Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Coast Highway
Jab Number: 8211
Road Segment: East of Newport CTR
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily TreMc (Adt):
45,300 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
4,530 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tracks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barney.
100.0 feet
No Source Elevations (in feet)
Centerline Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TreMc Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Autos:
68.46 5.38
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 4.61
-4.11
-1.20 -4.87
0.000
0.000
Medium Tmcks:
79.45 -11.86
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -12.63
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -15.81
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -16.58
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
68.5 66.6
64.9 58.8
67.4 68.0
Autos.,
67.8 65.9
64.1 58.0
66.7 67.3
Medium Trucks:
62.3 60.8
54.4 52.9
61.3 61.6
Medium Trucks:
61.5 60.0
53.6 52.1
60.6 60.8
Heavy Trucks.
63.1 61.7
52.7 53.9
62.3 62.4
Heavy Trucks.
62.4 60.9
51.9 53.1
61.5 61.6
Vehicle Noise:
70.4 68.6
65.5 60.8
69.3 69.8
Vehicle Noise:
69.6 67.8
64.7 60.0
68.6 69.0
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
90 195
419
903
Ldn:
80 173
372
802
CNEL:
97 209
450
968
CNEL:
86 185
399
860
Tuesday, May 29, 2012
6.1-72
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Coast Highway
Jab Number: 8211
Road Segment: Westof Avacado
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 43,800 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
4,380 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed:
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 feet
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMELI
TreMc Flow I Distance
Finite Road Fresnel Band rAtfim I Bem1 Aden
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Coast Highway
Jab Number: 8211
Road Segment: East of Avacado
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
45,100 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
4,510 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Trucks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Trucks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barney.
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer.
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType I REMEL
I Traffic Flow Distance
Finite Road Fresnel BarrierAtten I Berm Allen
Autos:
68.46 4.46
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 4.59
-4.11
-1.20 -4.87
0.000
0.000
Medium Trucks:
79.45 -12.77
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -12.65
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks.,
84.25 -16.73
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -16.60
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
67.6 65.7
63.9 57.9
66.5 67.1
Autos.,
67.7 65.8
64.1 58.0
66.6 67.2
Medium Trucks:
61.4 59.9
53.5 51.9
60.4 60.6
Medium Trucks:
61.5 60.0
53.6 52.1
60.5 60.8
Heavy Trucks:
62.2 60.8
51.8 53.0
61.4 61.5
Heavy Trucks:
62.3 60.9
51.9 53.1
61.5 61.6
Vehicle Noise:
69.4 67.7
64.6 59.9
68.4 68.9
Vehicle Noise:
69.6 67.8
64.7 60.0
68.5 69.0
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
70 dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
78 169
364
784
Ldn:
80 172
371
800
CNEL:
84 181
390
841
CNEL:
86 185
398
858
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Coast Highway
Job Number: 8211
Road Segment: Westof Macarthur
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt): 45,300 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
4,530 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tracks: 84.8% 4.9% 10.3% 1.84%
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Berner
100.0 feet
Noise Source Elevations (in feet)
Centedine Dist. to Observer,
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (in feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
Traffic Flow Distance
Finite Road Fresnel BarrierAtten Bem1 Allen
Tuesday, May 29, 2012
FHWA-RD-77-108 HIGHWAY
Scenario: Year 2016 With Project
NOISE PREDICTION MODEL
Project Name: NNCPC
Road Name: Coast Highway
Job Number: 8211
Road Segment: Eastof Macarthur
SITE SPECIFIC INPUT DATA
NOISE MODEL INPUTS
Highway Data
Site Conditions (Hard =10, Soft =15)
Average Daily Traffic (Adt):
61,800 vehicles
Autos: 15
Peak Hour Percentage:
10 %
Medium Trucks (2 Axles): 15
Peak Hour Volume:
6,180 vehicles
Heavy Trucks (3+Axles): 15
Vehicle Speed.,
45 mph
Vehicle Mix
Near/Far Lane Distance:
76 feet
VehicleType I Day Evening Night Daily
Site Data
Autos: 77.5% 12.9% 9.6% 97.42%
Medium Tracks: 84.8% 4.9% 10.3% 1.84
Baffler Height: 0.0 het
Barrier Type(0-Wall, 1-Berm):
0.0 Heavy Tmcks: 86.5% 2.7% 10.8% 0.74%
Centerline Dist. to Barney.
100.0 feet
No Source Elevations (in feet)
Centedine Dist. to Observer
100.0 feet
Autos: 2.000
Barrier Distance to Observer:
0.0 feet
Medium Trucks: 4.000
Observer Height (Above Pad):
5.0 feet
Heavy Trucks: 8.006 Grade Adjustment 0.0
Pad Elevation:
0.0 feet
Lane Equivalent Distance (In feet)
Road Elevation:
0.0 feet
Autos: 92.547
Road Grade: 0.0%
Left View:
-90.0 degrees
Medium Trucks: 92.504
Right View:
90.0 degrees
Heavy Trucks: 92.547
FHWA Noise Model Calculations
VehicleType REMEL
TreMc Flow Distance
Finite Road Fresnel BarrierAtfim Bem1 Allen
Autos:
68.46 4.61
-4.11
-1.20 -4.87
0.000
0.000
Autos:
68.46 5.96
-4.11
-1.20 -4.87
0.000
0.000
Medium Tmcks:
79.45 -12.63
-4.11
-1.20 -4.97
0.000
0.000
Medium Trucks:
79.45 -11.28
-4.11
-1.20 -4.97
0.000
0.000
Heavy Trucks:
84.25 -16.58
-4.11
-1.20 -5.16
0.000
0.000
Heavy Trucks.,
84.25 -15.24
-4.11
-1.20 -5.16
0.000
0.000
Unmitigated Noise Levels (without Topo and barrier attenuation) Unmitigated Noise Levels (without
Topo and barrier attenuation)
VehicleType
Leq Peak Hour I
Leq Day
Leq Evening
Leq Night
Ldn
CNEL
VehicleType I
Leq Peak Hour I
Leq Day FLeq
Evening
Leq Night
Ldn
CNEL
Autos.,
67.8 65.9
64.1 58.0
66.7 67.3
Autos.,
69.1 67.2
65.4 59.4
68.0 68.6
Medium Trucks:
61.5 60.0
53.6 52.1
60.6 60.8
Medium Trucks:
62.9 61.4
55.0 53.4
61.9 62.1
Heavy Trucks.
62.4 60.9
51.9 53.1
61.5 61.6
Heavy Trucks.
63.7 62.3
53.2 54.5
62.8 63.0
Vehicle Noise:
69.6 67.8
64.7 60.0
68.6 69.0
Vehicle Noise:
70.9 69.2
66.0 61.4
69.9 70.4
Centedine Distance to Noise Contour (in feet)
Centedine Distance to Noise Contour (in feet)
7o dBA
65 dBA
60 dBA
55 dBA
70 dBA
65 dBA
60 dBA
55 dBA
Ldn:
80 173
372
802
Ldn:
99 213
458
987
CNEL:
86 185
399
860
CNEL:
106
228
491
1,058
Tuesday, May 29, 2012
6.1-73
Tuesday, May 29, 2012
No
01-1 Initial Study and General Plan Program EIR Addendum No. 2 Technical Appendix D
North Newport Center San Joaquin Plaza TPO Traffic Analysis Stantec Consulting Services, Inc.
May 2012
NNCPC Development Plan Amendment and Related Actions June 2012 Lead Agency: City of Newport Beach
0 Stantec
North Newport Center
San Joaquin Plaza TPO
Traffic Analysis
May 2012
Prepared For:
City of Newport Beach
2073006780
North Newport Center San Joaquin Plaza TPO
Cathy Lawrence, PE
Joe Foust, PE
Traffic Analysis
City of Newport Beach
May 16, 2012
Prepared for:
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
Submitted by:
Stantec Consulting Services Inc.
19 Technology Drive, Suite 200
Irvine, CA 92618
Prepared by:
QRDFI=5S�O1�`
rT
16 ►�� n
No.TRoO1635
Transportation Engineer Up. �2-
Stantec ConsultingServices Inc. T rRAFF\
C �
�T£ OF C .
Reviewed by:
PrVt'e1c"
al, Transportation Planning and Traffic Engineering
St Consulting Services Inc.
Stantec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table of Contents
1.0 INTRODUCTION...................................................................................................................1
2.0 TRAFFIC PHASING ORDINANCE ANALYSIS....................................................................1
3.0 CUMULATIVE CONDITIONS ANALYSIS.............................................................................6
4.0 GENERAL PLAN ANALYSIS.............................................................................................17
5.0 CONCLUSION.....................................................................................................................17 City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Sya ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table of Contents
List of Figures
Figure 1 San Joaquin Plaza Project Description..................................................................... 2 Figure 2 TPO Analysis Study Intersections............................................................................ 3 Figure 3 General Project Trip Distribution and Project ADT..................................................... 8 Figure 4 AM Peak Hour Project -Generated Trips................................................................... 9 Figure 5 PM Peak Hour Project -Generated Trips.................................................................. 10 Figure 6 Peak Hour Project -Generated Trips....................................................................... 11 List of Tables
Table 1 Existing ICU Summary ............................................................................................4 Table 2 Approved Projects Summary ................................................................................... 5 Table 3 Trip Generation Summary ....................................................................................... 7 Table 4 Existing -Plus -Project ICU Summary.......................................................................... 12 Table 5 One Percent Traffic Analysis Summary................................................................... 13 Table 6 Year 2016 ICU Summary..................................................................................... 15 Table 7 Cumulative Projects Summary................................................................................ 16 Table 8 Cumulative ICU Summary ..................................................................................... 18 Appendices
Appendix A: ICU Analysis Calculations
Appendix B: One Percent Analysis Worksheets
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpi_sanjoaquinplaza_tpo_051612.docx S}a ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS
1.0 Introduction
This report summarizes an analysis performed for the proposed development of 524 residential units in the San Joaquin Plaza area of North Newport Center in the City of Newport Beach. A portion of the units (430 dwelling units) is currently entitled on the proposed site, a portion (79 units) is a conversion from unbuilt hotel rooms on a site within Newport Center to dwelling units, and the remainder (15 units) is unbuilt within Newport Center area (project location shown in Figure 1). The units which are not currently entitled on the site (94 units) are being analyzed in this report based on the City's Traffic Phasing Ordinance (TPO) methodology. In addition, this report summarizes the results of an analysis of cumulative conditions in compliance with California Environmental Quality Act (CEQA) requirements.
2.0 Traffic Phasing Ordinance Analysis
The City of Newport Beach identified 20 intersections for analysis to determine the impact of the proposed residential project. These intersections are illustrated in Figure 2.
Existing peak hour intersection volumes for the study locations were counted in March 2012 by Traffic Data Services, Inc., consistent with the TPO requirements. Existing intersection levels of service are based on intersection capacity utilization (ICU) values. The ICU values are a means of presenting the volume to capacity ratios, with a V/C ratio of .90 representing the upper threshold for an acceptable level of service (LOS D) in the City of Newport Beach. Existing lane configurations were assumed, and a capacity of 1,600 vph per lane with no clearance factor was utilized. The City methodology calculates the ICU value to three decimal places, and then reports the resulting ICU value rounded to two decimal places.
Existing ICU values for the study intersections assuming existing lane configurations are summarized in Table 1 (actual ICU calculation sheets are included in Appendix A). As this table shows, the study intersections are currently operating at LOS D or better during the AM and PM peak hours.
An ambient growth rate of 1.0 percent per year was added to the existing volumes along Jamboree Road, MacArthur Boulevard, and Coast Highway. The project is assumed to be complete in 2015; therefore, the study year is 2016 consistent with the TPO guidelines. Traffic generated by approved projects in the study area (including the entitled 430 DU in San Joaquin Plaza), obtained from City Staff, were added to the existing -plus -growth peak hour volumes to obtain year 2016 background peak hour volumes for the intersections prior to the addition of project -generated traffic. Table 2 summarizes the approved projects included in this analysis.
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpi_sanjoaquinplaza_tpo_051612.docx Sya ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 1 Existing ICU Summary
Intersection
1. Jamboree & Ford/Eastbluff
Existing
AM PM
.74/C .61/B
2. Jamboree & San Joaquin Hills
.60/A
.70/13
3. Jamboree & Santa Barbara
.44/A
.57/A
4. Jamboree & Coast H
.56/A
.65/13
5. Newport Center & Coast Hwy
.36/A
.44/A
6. Avocado & Coast H
.44/A
.50/A
7. MacArthur & Ford/Bonita Canyon
.73/C
.82/D
8. MacArthur & San Joaquin Hills
.65/13
.80/C
9. MacArthur & San Miguel
.53/A
.44/A
10. MacArthur & Coast H
.66/13
.64/13
11. Santa Cruz & San Joaquin Hills
.26/A
.36/A
12. Santa Cruz & San Clemente
.14/A
.25/A
13. Santa Cruz & Newport Center
.15/A
.31/A
14. Santa Rosa & San Joaquin Hills
.29/A
.49/A
15. Newport Center & Santa Rosa
.12/A
.34/A
16. Newport Center & San Miguel
.14/A
.32/A
17. Avocado & San Miguel
.31/A
.49/A
18. Newport Center & Newport Center
.18/A
.36/A
19. Santa Barbara & San Clemente
.27/A
.33/A
20. Newport Center & Santa Barbara
.12/A
.21/A
Level of service ranges: .00 - .60 A
.61 - .70 B
.71 - .80 C
.81 - .90 D
.91 - 1.00 E
Above 1.00 F
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Sy' ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 2 Approved Projects Summary
Project
Island Expansion
Percent Complete
40 Temple Bat Yahm Expansion
65 CIOSA — Irvine Project
91 Newport Dunes
0 Hoag Hospital Phase III
0 St. Mark Presbyterian Church
77 OLQA Church Expansion
0 2300 Newport Blvd
0 Newport Executive Court
0 Hoag Health Center
75 North Newport Center
0 Santa Barbara Condo
0 Newport Beach City Hall
0 328 Old Newport Medical Office
0 Coastline Community College
0 Ba view Medical Office
0 Mariner's Pointe
0 4221 Dolphin Striker
0 City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Sy' ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Trip rates and the resulting trip generation for the proposed project are summarized in Table 3.
These trips were distributed to the surrounding circulation system according to the general distribution shown in Figure 3. Figures 4 through 6 illustrate the peak hour project -generated trips at the study intersections. Existing -plus -project peak hour volumes were obtained by adding the project -generated peak hour trips to the existing peak hour volumes. The ICU values for existing - plus -project conditions are summarized in Table 4. Similarly, background -plus -project peak hour volumes were obtained by adding the project -generated peak hour trips to the 2016 background peak hour volumes presented above.
The TPO analysis consists of a one percent analysis and an ICU analysis at each study intersection. The one percent analysis compares the proposed project traffic with projected background peak hour volumes. To pass the one percent analysis, peak hour traffic from the proposed project must be less than one percent of the projected background peak hour traffic on each leg of the intersection. If the proposed project passes the one percent analysis, then the ICU analysis is not required for that intersection and no further analysis is necessary. If the proposed project does not pass the one percent analysis, then the ICU analysis must be performed for each intersection which fails to pass the one percent test.
Table 5 summarizes the results of the one percent analysis for the proposed project (the one percent analysis sheets are included in Appendix B). As this table indicates, the proposed project does not pass the one percent analysis at 12 study intersections during the AM or PM peak hour; therefore, an ICU analysis is required for these 12 intersections.
An ICU analysis was performed for the 12 intersections which did not pass the one percent test.
Table 6 summarizes the existing, 2016 background, and 2016 background -plus -project ICU values during the AM and PM peak hours (actual ICU calculation sheets are included in Appendix A).
As the ICU summary table indicates, each of the intersections will operate at LOS D or better during the AM and PM peak hours. The project has no significant impact on the study intersections, and no mitigation is required.
3.0 Cumulative Conditions Analysis
City Staff provided a list of six known but not approved projects for use in a cumulative conditions analysis. These cumulative projects are summarized in Table 7. Trip generation and distribution for each cumulative project was also provided by City Staff. The peak hour cumulative intersection volumes were added to the 2016 background peak hour volumes presented earlier, and the project peak hour trips were added to the resulting 2016 background -plus -cumulative City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx S}a ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 3 Trip Generation Summary
r
ITE 232
DU .06 .28 .34 .24 .14 .38 4.18
Trip Generation
Residential
94 DU 6 26 32 23 13 36 393
Source: Trip Generation 8n
Edition, Institute of Transportation Engineers
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Sy' ntec
10 11
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 4 Existing -Plus -Project ICU Summary
ExistingExisting ProjectIntersection AM PM AM PM
1. Jamboree & Ford/Eastbluff .74/C .61/13 .74/C .61/B
Project
AM PM
.00 .00
2. Jamboree & San Joaquin Hills
.60/A
.70/13
.60/A
.70/13
.00
.00
3. Jamboree & Santa Barbara
.44/A
.57/A
.44/A
.57/A
.00
.00
4. Jamboree & Coast Hwy
.56/A
.65/13
.56/A
.65/13
.00
.00
5. Newport Center & Coast Hwy
.36/A
.44/A
.37/A
.45/A
.01
.01
6. Avocado & Coast Hwy
.44/A
.50/A
.44/A
.50/A
.00
.00
7. MacArthur & Ford/Bonita Canyon
.73/C
.82/D
.73/C
.82/D
.00
.00
8. MacArthur & San Joaquin Hills
.65/13
.80/C
.65/13
.80/C
.00
.00
9. MacArthur & San Miguel
.53/A
.44/A
.53/A
.44/A
.00
.00
10. MacArthur & Coast Hwy
.66/13
.64/13
.66/13
.64/13
.00
.00
11. Santa Cruz & San Joaquin Hills
.26/A
.36/A
.27/A
.37/A
.01
.01
12. Santa Cruz & San Clemente
.14/A
.25/A
.14/A
.26/A
.00
.01
13. Santa Cruz & Newport Center
.15/A
.31/A
.15/A
.31/A
.00
.00
14. Santa Rosa & San Joaquin Hills
.29/A
.49/A
.29/A
.50/A
.00
.01
15. Newport Center & Santa Rosa
.12/A
.34/A
.12/A
.34/A
.00
.00
16. Newport Center & San Miguel
.14/A
.32/A
.14/A
.32/A
.00
.00
17. Avocado & San Miguel
.31/A
.49/A
.31/A
.49/A
.00
.00
18. Newport Center & Newport Center
.18/A
.36/A
.18/A
.36/A
.00
.00
19. Santa Barbara & San Clemente
.27/A
.33/A
.27/A
.33/A
.00
.00
20. Newport Center & Santa Barbara
.12/A
.21/A
.12/A
.21/A
.00
.00
Level of service ranges: .00- .60 A
.61 - .70 B
.71 - .80 C
.81 - .90 D
.91 - 1.00 E
Above 1.00 F
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Sy' ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 5 One Percent Traffic Analysis Summary
Less Than 1 r
AM Peak Hour PM Peak Hour Of Projected 2016
-ak Hour Volumes?
1. Jamboree & Ford/Eastbluff
2016 Projected Peak Hour Volume
1,892
2,207
865
697
2,766
1,891
614
386
Project Peak Hour Trips
10 2
0 1
5 7
0 2
Yes
2. Jamboree & San Joaquin Hills
2016 Projected Peak Hour Volume
1,406
2,549
395
199
1,644
2,250
143
912
Project Peak Hour Trips
8 2
0 3
6 9
0 1
No
3. Jamboree & Santa Barbara
2016 Projected Peak Hour Volume
1,528
1,819
60 181
1,481
1,687
81 726
Project Peak Hour Trips
2 0
0 14
6 1
0 7
No
4. Jamboree & Coast Hwy
2016 Projected Peak Hour Volume
465
1,243
2,596
1,194
432
1,599
2,623
2,284
Project Peak Hour Trips
0 7
1 1
0 3
4 2
Yes
5. Newport Ctr & Coast Hwy
2016 Projected Peak Hour Volume
0 113
2,188
1,292
0 849
1,704
1,690
Project Peak Hour Trips
0 2
2 2
0 1
1 3
No
6. Avocado & Coast Hwy
2016 Projected Peak Hour Volume
361
191
1,374
1,455
295
603
1,456
1,548
Project Peak Hour Trips
0 0
4 2
0 0
2 3
Yes
7. MacArthur & Ford/Bonita C n
2016 Projected Peak Hour Volume
2,133
3,156
415
2,080
2,773
3,744
425
1,165
Project Peak Hour Trips
4 1
2 0
2 5
2 1
Yes
8. MacArthur & San Joaquin Hills
2016 Projected Peak Hour Volume
1,493
3,203
509
1,071
1,613
2,811
1,172
728
Project Peak Hour Trips
0 1
5 0
0 4
3 1
No
9. MacArthur & San Miguel
2016 Projected Peak Hour Volume
1,554
1,536
330
470
1,125
1,513
1,225
455
Project Peak Hour Trips
0 0
1 0
1 0
0 0
Yes
10. MacArthur & Coast Hwy
2016 Projected Peak Hour Volume
0 1,092
1,653
2,092
0 1,359
1,680
2,028
Project Peak Hour Trips
0 1
4 2
0 0
2 4
Yes
Continued
City of Newport Beach
CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpi_sanjoaquinplaza_tpo_051612.docx StanW
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 5 One Percent Traffic Analysis Summary (Continued) Less Than 1 r
AM Peak Hour PM Peak Hour Of Projected 2016
-ak Hour Volumes?
11. Santa Cruz & San Joaquin Hills
2016 Projected Peak Hour Volume
118
82 932
399
781
39 783
584
Project Peak Hour Trips
4 0
5 1
2 0
7 5
No
12. Santa Cruz & San Clemente
2016 Projected Peak Hour Volume
144
360
95 35
577
315
336
102
Project Peak Hour Trips
0 3
5 0
2 6
3 0
No
13. Santa Cruz & Newport Ctr
2016 Projected Peak Hour Volume
60 269
140
178
254
255
280
317
Project Peak Hour Trips
0 3
0 0
1 0
0 1
No
14. Santa Rosa & San Joaquin Hills
2016 Projected Peak Hour Volume
169
132
583
1,015
797
143
789
767
Project Peak Hour Trips
0 0
5 1
0 0
3 5
Yes
15. Newport Ctr & Santa Rosa
2016 Projected Peak Hour Volume
204
107
84 400
509
320
270
508
Project Peak Hour Trips
0 1
0 0
1 0
0 0
No
16. Newport Ctr & San Miguel
2016 Projected Peak Hour Volume
255
106
39 288
423
298
347
609
Project Peak Hour Trips
0 1
0 0
0 0
0 1
No
17. Avocado & San Miguel
2016 Projected Peak Hour Volume
381
120
218
1,212
720
321
734
893
Project Peak Hour Trips
0 0
1 0
0 0
0 1
Yes
18. Newport Ctr & Newport Ctr
2016 Projected Peak Hour Volume
461
24 128
191
428
192
361
472
Project Peak Hour Trips
1 0
2 0
1 0
1 0
No
19. Santa Barbara & San Clemente
2016 Projected Peak Hour Volume
100
724
0 65
404
278
0 406
Project Peak Hour Trips
1 0
0 6
1 2
0 4
No
20. Newport Ctr & Santa Barbara
2016 Projected Peak Hour Volume
256
146
204
40 281
334
280
148
Project Peak Hour Trips
1 1
1 0
1 0
1 0
No
Note:
2016 Projected peak hour volume consists of existing volume, regional growth, and approved projects volume.
City of Newport Beach
CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpi_sanjoaquinplaza_tpo_051612.docx Rantec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 6 Year 2016 ICU Summary
Intersection
2. Jamboree & San Joaquin Hills
+ Approved
AM
.65/13
+ Growth I
I
PM
.80/C
Existing + Growth +
Approved + Project
AM PM
.65/13 .80/C
ProjectExisting
Increase
AM T7P -M
.00
.00
3. Jamboree & Santa Barbara
.48/A
.61/B
.48/A
.61/B
.00
.00
5. Newport Center & Coast Hwy
.39/A
.48/A
.39/A
.49/A
.00
.01
8. MacArthur & San Joaquin Hills
.69/13
.86/D
.69/13
.87/D
.00
.01
11. Santa Cruz & San Joaquin Hills
.29/A
.38/A
.30/A
.38/A
.01
.00
12. Santa Cruz & San Clemente
.14/A
.26/A
.14/A
.26/A
.00
.00
13. Santa Cruz & Newport Center
.15/A
.31/A
.15/A
.31/A
.00
.00
15. Newport Center & Santa Rosa
.15/A
.40/A
.15/A
.40/A
.00
.00
16. Newport Center & San Miguel
.15/A
.34/A
.15/A
.34/A
.00
.00
18. Newport Center & Newport Center
.18/A
.38/A
.18/A
.38/A
.00
.00
19. Santa Barbara & San Clemente
.28/A
.33/A
.28/A
.33/A
.00
.00
20. Newport Center & Santa Barbara
.13/A
.22/A
.13/A
.22/A
.00
.00
Level of service ranges: .00- .60 A
.61 - .70 B
.71 - .80 C
.81 - .90 D
.91 - 1.00 E
Above 1.00 F
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Sy' ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 7 Cumulative Projects Summary
Project �Land Use Amount
Medical Arts Medical Office 12.25 TSF
Banning Ranch
Single Family Detached
423 DU
Condominium/Townhouse
952 DU
Retail
75.00 TSF
Hotel
75 Rm
Sunset Ridge Park
Park
13.67 Acre
Marina Park
Marina/Park
10.45 Acre
Koll-Conexant
Apartment
974 DU
Newport Coast TAZ 1 — 4
Single Family Detached
954 DU
Condominium/Townhouse
389 DU
Multi-Familv Attached
175 DU
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Sy' ntec m
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS peak hour volumes. The previous one percent analysis without cumulative volumes represents the worst -case one percent analysis since the addition of cumulative traffic to the background volumes increases the chances of a project passing the one percent analysis. If an intersection passes the one percent analysis prior to the addition of cumulative traffic, then the intersection will pass the one percent analysis with the addition of cumulative traffic and no further analysis is required at that location.
The results of the cumulative ICU analysis are summarized in Table 8 (actual ICU calculation sheets are included in Appendix A). As the cumulative ICU table indicates, the proposed project will have no significant impact on the study intersections, each of which will operate at LOS D or better during the AM and PM peak hours, and no mitigation is required.
4.0 General Plan Analysis
The TPO analysis evaluates a project's potential short-term impacts. The project's consistency with the General Plan was also evaluated. San Joaquin Plaza has 430 DU currently entitled on the project site. Newport Center has 79 hotel rooms and 15 DU that are currently unbuilt but are identified in the General Plan. The proposed project consists of converting the 79 hotel rooms to 79 dwelling units, and developing 94 DU (79 DU + 15 DU) not currently entitled in San Joaquin Plaza. The peak hour and daily trips generated by 79 DU are less than the trips generated by 79 hotel rooms; therefore, the impact of residential units in Newport Center is less than the impact of an equivalent amount of hotel rooms. The proposed project will have less impact than the uses identified in the General Plan; hence the project is consistent with the General Plan.
5.0 Conclusion
The proposed 94 DU will generate 32 AM peak hour trips, 36 PM peak hour trips, and 393 daily trips. The marginal impact of project traffic on the street system was determined at 20 intersections in the vicinity. Of the 20 intersections, 12 did not pass the City's one percent analysis; however, the project had no marginal impact on the ICU values at these 12 intersections, which will continue to operate at LOS D or better during the AM and PM peak hours under 2016 conditions. Consequently, the proposed project has no significant impact on the study intersections, and no additional intersection improvements are required.
The impact of traffic from known but not approved projects was included in a cumulative conditions analysis. Under cumulative conditions, the project had no marginal impact during the City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx S}a ntec m
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS Table 8 Cumulative ICU Summary
Existing + GrowthExisting
Approved
Intersection
1. Jamboree & Ford/Eastbluff .82/D .70/13
+ Growth
Approved
+ Cumulative Project
Project+ -
.82/D .70/13 .00 .00
2. Jamboree & San Joaquin Hills
.68/13
.83/D
.68/13
.83/D
.00
.00
3. Jamboree & Santa Barbara
.50/A
.63/13
.51/A
.63/13
.01
.00
4. Jamboree & Coast Hwy
.66/13
.83/D
.67/13
.83/D
.01
.00
5. Newport Center & Coast Hwy
.42/A
.53/A
.42/A
.53/A
.00
.00
6. Avocado & Coast Hwy
.56/A
.59/A
.56/A
.59/A
.00
.00
7. MacArthur & Ford/Bonita Canyon
.78/C
.89/D
.78/C
.89/D
.00
.00
8. MacArthur & San Joaquin Hills
.71/C
.89/D
.71/C
.89/D
.00
.00
9. MacArthur & San Miguel
.60/A
.50/A
.60/A
.50/A
.00
.00
10. MacArthur & Coast Hwy
.78/C
.75/C
.78/C
.75/C
.00
.00
11. Santa Cruz & San Joaquin Hills
.29/A
.38/A
.30/A
.39/A
.01
.01
12. Santa Cruz & San Clemente
.15/A
.26/A
.15/A
.26/A
.00
.00
13. Santa Cruz & Newport Center
.16/A
.32/A
.16/A
.32/A
.00
.00
14. Santa Rosa & San Joaquin Hills
.35/A
.54/A
.35/A
.54/A
.00
.00
15. Newport Center & Santa Rosa
.16/A
.40/A
.16/A
.40/A
.00
.00
16. Newport Center & San Miguel
.16/A
.35/A
.16/A
.35/A
.00
.00
17. Avocado & San Miguel
.34/A
.55/A
.34/A
.55/A
.00
.00
18. Newport Center & Newport Center
.19/A
.38/A
.19/A
.39/A
.00
.01
19. Santa Barbara & San Clemente
.28/A
.33/A
.28/A
.33/A
.00
.00
20. Newport Center & Santa Barbara
.13/A
.23/A
.13/A
.23/A
.00
.00
Level of service ranges: .00 - .60 A
.61 - .70 B
.71 - .80 C
.81 - .90 D
.91 - 1.00 E
Above 1.00 F
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Sy' ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS AM or PM peak hour on the ICU values at all of the study intersections. Therefore the proposed project has no significant impact on the study intersections under cumulative conditions, and no intersection mitigation measures are required.
The proposed project will generate less peak hour and daily traffic than the land uses identified in the General Plan; therefore the project is consistent with the General Plan.
City of Newport Beach CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx S}a ntec
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS
APPENDIX A
ICU Worksheets
City of Newport Beach
CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx Stantec m
1. Jamboree & Ford/Eastbluff
Existing
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 419 .131* 328 .103
NBT 3 4800 1196 .269 1817 .444*
NBR 0 0 93 314
SBL 1 1600 73 .046 31 .019*
SBT 3 4800 1730 .360* 1570 .327
SBR 1 1600 143 .089 75 .047
EBL 1.5 182 103 .064
EBT 1.5 4800 284 .097* 234 .073*
EBR f 390 272
WBL 1.5 160 .100 164
WBT 1.5 4800 485 .152* 189 .074*
WBR 1 1600 40 .025 27 . M
Note: Assumes E/W Split Phasing
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
419
.131*
328
.103
NBT
3 4800
1204
.271
1821
.445*
NBR
0 0
95 315
SBL
1 1600
73 .046
31 .019*
SBT
3 4800
1732
.361*
1577
.329
SBR
1 1600
143
.089
75 .047
EBL
1.5 182
103
.064
EBT
1.5 4800
284
.097*
234
.073*
EBR
f
390
272
WBL
1.5 161
.101
166
WBT
1.5 4800
485
.152*
189
.074*
WBR
1 1600
40 .025
27 .017
Note:
Assumes
E/W Split
Phasing
TOTAL CAPACITY UTILIZATION .740 .610 TOTAL CAPACITY UTILIZATION .741 .611 Existing + Growth + Approved
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 439 .137* 346 .108
NBT 3 4800 1354 .303 2089 .504*
NBR 0 0 100 332
SBL 1 1600 76 .048 33 .021*
SBT 3 4800 1981 .413* 1780 .371
SBR 1 1600 150 .094 78 .049
EBL 1.5 183 103 .064
EBT 1.5 4800 289 .098* 234 .073*
EBR f 393 277
WBL 1.5 161 .101 170
WBT 1.5 4800 495 .155* 189 .070*
WBR 1 1600 41 .026 27 .017
Note: Assumes E/W Split Phasing
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
439
.137*
346
.108
NBT
3 4800
1362
.305
2093
.505*
NBR
0 0
102
333
SBL
1 1600
76 .048
33 .021*
SBT
3 4800
1983
.413*
1787
.372
SBR
1 1600
150
.094
78 .049
EBL
1.5 183
103
.064
EBT
1.5 4800
289
.098*
234
.073*
EBR
f
393
277
WBL
1.5 162
.101
172
WBT
1.5 4800
495
.155*
189
.075*
WBR
1 1600
41 .026
27 .017
Note:
Assumes
E/W Split
Phasing
TOTAL CAPACITY UTILIZATION .803 .673 TOTAL CAPACITY UTILIZATION .803 .674 Stantec A-2
1. Jamboree & Ford/Eastbluff
Existing + Growth + Approved + Cumulative
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 448 .140* 351 .110
NBT 3 4800 1515 .336 2170 .521*
NBR 0 0 100 332
SBL 1 1600 76 .048 33 .021*
SBT 3 4800 2020 .421* 1943 .405
SBR 1 1600 150 .094 78 .049
EBL 1.5 183 103 .064
EBT 1.5 4800 296 .100* 255 .080*
EBR f 395 286
WBL 1.5 161 .101 170
WBT 1.5 4800 516 .161* 203 .078*
WBR 1 1600 41 .026 27 . M
Note: Assumes E/W Split Phasing
Existing + Growth + Approved + Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
448
.140*
351
.110
NBT
3 4800
1523
.339
2174
.522*
NBR
0 0
102
333
SBL
1 1600
76 .048
33 .021*
SBT
3 4800
2022
.421*
1950
.406
SBR
1 1600
150
.094
78 .049
EBL
1.5 183
103
.064
EBT
1.5 4800
296
.100*
255
.080*
EBR
f
395
286
WBL
1.5 162
.101
172
WBT
1.5 4800
516
.161*
203
.078*
WBR
1 1600
41 .026
27 .017
Note:
Assumes
E/W Split
Phasing
TOTAL CAPACITY UTILIZATION .822 .700 TOTAL CAPACITY UTILIZATION .822 .701 Stantec A-3
2. Jamboree & San Joaquin Hills
Existing
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 26 .016 55 .034
NBT 3 4800 1110 .231* 1289 .269*
NBR f 140 131
SBL 2 3200 744 .233* 514 .161*
SBT 3 4800 1450 .302 1330 .277
SBR f 78 164
EBL 1.5 299 .093* 89 .028*
EBT 1.5 4800 38 .024 36 .023
EBR f 58 13
WBL 1.5 123 .038* 178 .056*
WBT 1.5 4800 8 .005 46 .029
WBR 1 1600 17 .011 572 .358
Right Turn Adjustment WBR .181*
Note: Assumes E/W Split Phasing
Existing + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 26 .016 55 .034
NBT 3 4800 1117 .233* 1293 .269*
NBR f 141 133
SBL 2 3200 746 .233* 522 .163*
SBT 3 4800 1450 .302 1331 .277
SBR f 78 164
EBL 1.5 299 .093* 89 .028*
EBT 1.5 4800 38 .024 36 .023
EBR f 58 13
WBL 1.5 123 .038* 178 .056*
WBT 1.5 4800 8 .005 46 .029
WBR 1 1600 20 .013 573 .358
Right Turn Adjustment WBR .180*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .595 .695 TOTAL CAPACITY UTILIZATION .597 .696 Existing + Growth + Approved
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 27 .017 58 .036
NBT 3 4800 1229 .256* 1442 .300*
NBR f 150 144
SBL 2 3200 819 .256* 581 .182*
SBT 3 4800 1649 .344 1499 .312
SBR f 81 171
EBL 1.5 299 .093* 90 .028*
EBT 1.5 4800 38 .024 40 .025
EBR f 58 13
WBL 1.5 133 .042* 186 .058*
WBT 1.5 4800 8 .005 46 .029
WBR 1 1600 58 .036 680 .425
Right Turn Adjustment WBR .230*
Note: Assumes E/W Split Phasing
Existing + Growth + Approved + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 27 .017 58 .036
NBT 3 4800 1236 .258* 1446 .301*
NBR f 151 146
SBL 2 3200 821 .257* 589 .184*
SBT 3 4800 1649 .344 1500 .313
SBR f 81 171
EBL 1.5 299 .093* 90 .028*
EBT 1.5 4800 38 .024 40 .025
EBR f 58 13
WBL 1.5 133 .042* 186 .058*
WBT 1.5 4800 8 .005 46 .029
WBR 1 1600 61 .038 681 .426
Right Turn Adjustment WBR .230*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .647 .798 TOTAL CAPACITY UTILIZATION .650 .801 Stantec A-4
2. Jamboree & San Joaquin Hills
Existing + Growth + Approved + Cumulative
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 27 .017 58 .036
NBT 3 4800 1365 .284* 1544 .322*
NBR f 150 144
SBL 2 3200 836 .261* 581 .182*
SBT 3 4800 1707 .356 1639 .341
SBR f 81 171
EBL 1.5 299 .093* 90 .028*
EBT 1.5 4800 38 .024 40 .025
EBR f 58 13
WBL 1.5 133 .042* 186 .058*
WBT 1.5 4800 8 .005 46 .029
WBR 1 1600 58 .036 696 .435
Right Turn Adjustment WBR .240*
Note: Assumes E/W Split Phasing
Existing + Growth + Approved + Cumulative + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 27 .017 58 .036
NBT 3 4800 1372 .286* 1548 .323*
NBR f 151 146
SBL 2 3200 838 .262* 589 .184*
SBT 3 4800 1707 .356 1640 .342
SBR f 81 171
EBL 1.5 299 .093* 90 .028*
EBT 1.5 4800 38 .024 40 .025
EBR f 58 13
WBL 1.5 133 .042* 186 .058*
WBT 1.5 4800 8 .005 46 .029
WBR 1 1600 61 .038 697 .436
Right Turn Adjustment WBR .240*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .680 .830 TOTAL CAPACITY UTILIZATION .683 .833 Stantec A-5
3. Jamboree & Santa Barbara
Existing
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 10 .006 17 .011
NBT 3 4800 1115 .232* 1176 .245*
NBR 1 1600 289 .181 128 .080
SBL 2 3200 543 .170* 157 .049*
SBT 3 4800 1067 .222 1297 .270
SBR 1 1600 29 .018 74 .046
EBL 1 1600 33 .021* 45 .028*
EBT 1 1600 5 .003 17 .011
EBR 1 1600 16 .010 16 .010
WBL 1.5 39 243
WBT 0.5 3200 6 .014* 5 .078*
WBR 1 1600 99 .062 458 .286
Right Turn Adjustment WBR .171*
Note: Assumes E/W Split Phasing
Existing + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 10 .006 17 .011
NBT 3 4800 1116 .233* 1178 .245*
NBR 1 1600 290 .181 132 .083
SBL 2 3200 543 .170* 158 .049*
SBT 3 4800 1067 .222 1297 .270
SBR 1 1600 29 .018 74 .046
EBL 1 1600 33 .021* 45 .028*
EBT 1 1600 5 .003 17 .011
EBR 1 1600 16 .010 16 .010
WBL 1.5 46 246
WBT 0.5 3200 6 .016* 5 .078*
WBR 1 1600 106 .066 462 .289
Right Turn Adjustment WBR .174*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .437 .571 TOTAL CAPACITY UTILIZATION .440 .574 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
10 .006
18 .011
NBT
3 4800
1214
.253*
1319
.275*
NBR
1 1600
304
.190
144
.090
SBL
2 3200
570
.178*
178
.056*
SBT
3 4800
1218
.254
1426
.297
SBR
1 1600
31 .019
83 .052
EBL
1 1600
39 .024*
47 .029*
EBT
1 1600
5 .003
18 .011
EBR
1 1600
16 .010
16 .010
WBL
1.5 60
253
WBT
0.5 3200
6 .021*
6 .081*
WBR
1 1600
115
.072
467
.292
Right
Turn Adjustment
WBR
.169*
Note:
Assumes
E/W Split
Phasing
Existing + Growth + Approved + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 10 .006 18 .011
NBT 3 4800 1215 .253* 1321 .275*
NBR 1 1600 305 .191 148 .093
SBL 2 3200 570 .178* 179 .056*
SBT 3 4800 1218 .254 1426 .297
SBR 1 1600 31 .019 83 .052
EBL 1 1600 39 .024* 47 .029*
EBT 1 1600 5 .003 18 .011
EBR 1 1600 16 .010 16 .010
WBL 1.5 67 256
WBT 0.5 3200 6 .023* 6 .082*
WBR 1 1600 122 .076 471 .294
Right Turn Adjustment WBR .170*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .476 .610 TOTAL CAPACITY UTILIZATION .478 .612 Stantec A-6
3. Jamboree & Santa Barbara
Existing + Growth + Approved + Cumulative
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 10 .006 18 .011
NBT 3 4800 1350 .281* 1421 .296*
NBR 1 1600 304 .190 144 .090
SBL 2 3200 570 . M* 178 .056*
SBT 3 4800 1276 .266 1566 .326
SBR 1 1600 31 .019 83 .052
EBL 1 1600 39 .024* 47 .029*
EBT 1 1600 5 .003 18 .011
EBR 1 1600 16 .010 16 .010
WBL 1.5 60 253
WBT 0.5 3200 6 .021* 6 .081*
WBR 1 1600 115 .072 467 .292
Right Turn Adjustment WBR .169*
Note: Assumes E/W Split Phasing
Existing + Growth + Approved + Cumulative + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 10 .006 18 .011
NBT 3 4800 1351 .281* 1423 .296*
NBR 1 1600 305 .191 148 .093
SBL 2 3200 570 . M* 179 .056*
SBT 3 4800 1276 .266 1566 .326
SBR 1 1600 31 .019 83 .052
EBL 1 1600 39 .024* 47 .029*
EBT 1 1600 5 .003 18 .011
EBR 1 1600 16 .010 16 .010
WBL 1.5 67 256
WBT 0.5 3200 6 .023* 6 .082*
WBR 1 1600 122 .076 471 .294
Right Turn Adjustment WBR .170*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .504 .631 TOTAL CAPACITY UTILIZATION .506 .633 Stantec A-7
4. Jamboree & Coast Hwy
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
17 .011
41 .026
NBT
2 3200
340
.134*
290
.115*
NBR
0 0
88 79
SBL
1 1600
192
.120*
179
.112*
SBT
2 3200
291
.091
417
.130
SBR
f
594
856
EBL
3 4800
788
.164*
723
.151*
EBT
4 6400
1557
.246
1589
.258
EBR
0 0
19 60
WBL
2 3200
76 .024
132
.041
WBT
4 6400
921
.144*
1729
.270*
WBR
f
102
205
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
17 .011
41 .026
NBT
2 3200
340
.134*
290
.115*
NBR
0 0
88 79
SBL
1 1600
194
.121*
180
.113*
SBT
2 3200
291
.091
417
.130
SBR
f
599
858
EBL
3 4800
789
.164*
727
.151*
EBT
4 6400
1557
.246
1589
.258
EBR
0 0
19 60
WBL
2 3200
76 .024
132
.041
WBT
4 6400
921
.144*
1729
.270*
WBR
f
103
207
TOTAL CAPACITY UTILIZATION .562 .648 TOTAL CAPACITY UTILIZATION .563 .649 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
18 .011
44 .028
NBT
2 3200
355
.140*
303
.122*
NBR
0 0
93 86
SBL
1 1600
206
.129*
194
.121*
SBT
2 3200
304
.095
437
.137
SBR
f
734
968
EBL
3 4800
872
.182*
846
.176*
EBT
4 6400
1703
.269
1715
.278
EBR
0 0
21 62
WBL
2 3200
80 .025
142
.044
WBT
4 6400
1007
.157*
1918
.300*
WBR
f
107
223
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
18 .011
44 .028
NBT
2 3200
355
.140*
303
.122*
NBR
0 0
93 86
SBL
1 1600
208
.130*
195
.122*
SBT
2 3200
304
.095
437
.137
SBR
f
739
970
EBL
3 4800
873
.182*
850
.177*
EBT
4 6400
1703
.269
1715
.278
EBR
0 0
21 62
WBL
2 3200
80 .025
142
.044
WBT
4 6400
1007
.157*
1918
.300*
WBR
f
108
225
TOTAL CAPACITY UTILIZATION .608 .719 TOTAL CAPACITY UTILIZATION .609 .721 Stantec A-8
4. Jamboree & Coast Hwy
Existing + Growth + Approved +
Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
18 .011
44 .028
NBT
2 3200
355
.140*
303
.122*
NBR
0 0
93 86
SBL
1 1600
243
.152*
323
.202*
SBT
2 3200
304
.095
437
.137
SBR
f
755
979
EBL
3 4800
878
.183*
871
.181*
EBT
4 6400
1784
.282
1933
.312
EBR
0 0
21 62
WBL
2 3200
80 .025
142
.044
WBT
4 6400
1210
.189*
2072
.324*
WBR
f
237
300
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
18 .011
44 .028
NBT
2 3200
355
.140*
303
.122*
NBR
0 0
93 86
SBL
1 1600
245
.153*
324
.203*
SBT
2 3200
304
.095
437
.137
SBR
f
760
981
EBL
3 4800
879
.183*
875
.182*
EBT
4 6400
1784
.282
1933
.312
EBR
0 0
21 62
WBL
2 3200
80 .025
142
.044
WBT
4 6400
1210
.189*
2072
.324*
WBR
f
238
302
TOTAL CAPACITY UTILIZATION .664 .829 TOTAL CAPACITY UTILIZATION .665 .831 Stantec A-9
5. Newport Center & Coast Hwy
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
19 .006*
164
.051*
SBT
0 0
0 0
SBR
f
69 635
EBL
2 3200
315
.098
314
.098*
EBT
3 4800
1718
.358*
1268
.264
EBR
0 0
0 0
WBL 0 0 0 0
WBT 3 4800 1051 .219 1416 .295*
WBR f 170 128
Existing + Project
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL V/C
VOL V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
21 .007*
165 .052*
SBT
0 0
0 0
SBR
f
69 635
EBL
2 3200
315
.098
314 .098*
EBT
3 4800
1720
.358*
1269 .264
EBR
0 0
0 0
WBL
0 0
1 {.0011*
0 WBT
3 4800
1052
.219
1418 .295*
WBR
f
170
129
TOTAL CAPACITY UTILIZATION .364 .444 TOTAL CAPACITY UTILIZATION .366 .445 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
24 .008*
170
.053*
SBT
0 0
0 0
SBR
f
89 679
EBL
2 3200
343
.107
348
.109*
EBT
3 4800
1846
.385*
1357
.283
EBR
0 0
0 0
WBL
0 0
0 0
WBT
3 4800
1113
.232
1547
.322*
WBR
f
179
143
Existing + Growth + Approved +
Project
AM PK HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
26 .008*
171
CJ-3*
SBT
0 0
0 0
SBR
f
89 679
EBL
2 3200
343
.107
348
.109*
EBT
3 4800
1848
.385*
1358
.283
EBR
0 0
0 0
WBL
0 0
1 1.0011*
0 WBT
3 4800
1114
.232
1549
.323*
WBR
f
179
144
TOTAL CAPACITY UTILIZATION .393 .484 TOTAL CAPACITY UTILIZATION .394 .485 Stantec A-10
5. Newport Center & Coast Hwy
Existing + Growth + Approved + Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
24 .008*
170
.053*
SBT
0 0
0 0
SBR
f
94 696
EBL
2 3200
356
.111*
359
.112*
EBT
3 4800
1951
.406
1693
.353
EBR
0 0
0 0
WBL
0 0
0 0
WBT
3 4800
1441
.300*
1761
.367*
WBR
f
179
143
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
26 .008*
171
.053*
SBT
0 0
0 0
SBR
f
94 696
EBL
2 3200
356
.111*
359
.112*
EBT
3 4800
1953
.407
1694
.353
EBR
0 0
0 0
WBL
0 0
1 0
WBT
3 4800
1442
.301*
1763
.367*
WBR
f
179
144
TOTAL CAPACITY UTILIZATION .419 .532 TOTAL CAPACITY UTILIZATION .420 .532 Stantec A-11
6. Avocado & Coast Hwy
Existing
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL VIC VOL VIC
NBL 1 1600 98 .061 112 .070*
NBT 1 1600 128 .080* 73 .046
NBR 1 1600 135 .084 110 .069
SBL 1.5 57 .036 253
SBT 0.5 3200 69 .043* 109 .113*
SBR f 50 139
EBL 1 1600 140 .088* 89 .056*
EBT 3 4800 1071 .223 1199 .250
EBR d 1600 49 .031 71 .044
WBL 1 1600 93 .058 100 .063
WBT 3 4800 1101 .229* 1260 .263*
WBR 1 1600 165 .103 104 .065
Note: Assumes NIS Split Phasing
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
VIC
VOL
VIC
NBL
1 1600
98 .061
112
.070*
NBT
1 1600
128
.080*
73 .046
NBR
1 1600
135
.084
110
.069
SBL
1.5 57
.036
253
SBT
0.5 3200
69 .043*
109
.113*
SBR
f
50 139
EBL
1 1600
140
.088*
89 .056*
EBT
3 4800
1075
.224
1201
.250
EBR
d
1600
49 .031
71 .044
WBL 1 1600 93 .058 100 .063
WBT 3 4800 1103 .230* 1263 .263*
WBR 1 1600 165 .103 104 .065
Note: Assumes NIS Split Phasing
TOTAL CAPACITY UTILIZATION .440 .502 TOTAL CAPACITY UTILIZATION .441 .502 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
VIC
VOL
VIC
NBL 1
1600
98 .061
112
.070*
NBT 1
1600
128
.080*
73 .046
NBR 1
1600
135
.084
110
.069
SBL 1.5 62 .039 286
SBT 0.5 3200 69 .043* 109 .123*
SBR f 60 208
EBL 1 1600 200 .125* 123 .077*
EBT 3 4800 1124 .234 1259 .262
EBR d 1600 51 .032 75 .047
WBL 1 1600 97 .061 104 .065
WBT 3 4800 1157 .241* 1322 .275*
WBR 1 1600 202 .126 121 .076
Note: Assumes NIS Split Phasing
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
VIC
VOL
VIC
NBL
1 1600
98 .061
112
.070*
NBT
1 1600
128
.080*
73 .046
NBR
1 1600
135
.084
110
.069
SBL
1.5 62
.039
286
SBT
0.5 3200
69 .043*
109
.123*
SBR
f
60 208
EBL
1 1600
200
.125*
123
.077*
EBT
3 4800
1128
.235
1261
.263
EBR
d
1600
51 .032
75 .047
WBL
1 1600
97 .061
104
.065
WBT
3 4800
1159
.241*
1325
.276*
WBR
1 1600
202
.126
121
.076
Note:
Assumes
NIS Split
Phasing
TOTAL CAPACITY UTILIZATION .489 .545 TOTAL CAPACITY UTILIZATION .489 .546 Stantec A-12
6. Avocado & Coast Hwy
Existing + Growth + Approved + Cumulative
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL VIC VOL VIC
NBL 1 1600 98 .061 112 .070*
NBT 1 1600 128 .080* 73 .046
NBR 1 1600 135 .084 110 .069
SBL 1.5 62 .039 286
SBT 0.5 3200 69 .043* 109 .123*
SBR f 60 208
EBL 1 1600 200 .125* 123 .077*
EBT 3 4800 1229 .256 1595 .332
EBR d 1600 51 .032 75 . W
WBL 1 1600 97 .061 104 .065
WBT 3 4800 1485 .309* 1536 .320*
WBR 1 1600 202 .126 121 .076
Note: Assumes NIS Split Phasing
Existing + Growth + Approved + Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
VIC
VOL
VIC
NBL
1 1600
98 .061
112
.070*
NBT
1 1600
128
.080*
73 .046
NBR
1 1600
135
.084
110
.069
SBL
1.5 62
.039
286
SBT
0.5 3200
69 .043*
109
.123*
SBR
f
60 208
EBL
1 1600
200
.125*
123
. M*
EBT
3 4800
1233
.257
1597
.333
EBR
d
1600
51 .032
75 . W
WBL
1 1600
97 .061
104
.065
WBT
3 4800
1487
.310*
1539
.321*
WBR
1 1600
202
.126
121
.076
Note:
Assumes
NIS Split
Phasing
TOTAL CAPACITY UTILIZATION .557 .590 TOTAL CAPACITY UTILIZATION .558 .591 Stantec A-13
7. MacArthur & Ford/Bonita Cyn
Existing
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 131 .041 88 .028
NBT 4 6400 1750 .273* 1870 .292*
NBR f 119 529
SBL 2 3200 574 .179* 1116 .349*
SBT 4 6400 2300 .359 2360 .369
SBR f 18 46
EBL 2 3200 45 .014 30 .009
EBT 2 3200 287 .090* 343 .107*
EBR 1 1600 78 .049 46 .029
WBL 2 3200 585 .183* 224 .070*
WBT 2 3200 563 .176 276 .086
WBR f 918 649
Existing + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 131 .041 88 .028
NBT 4 6400 1754 . M* 1872 .293*
NBR f 119 529
SBL 2 3200 574 . M* 1116 .349*
SBT 4 6400 2301 .360 2364 .369
SBR f 18 47
EBL 2 3200 46 .014 31 .010
EBT 2 3200 288 .090* 344 .108*
EBR 1 1600 78 .049 46 .029
WBL 2 3200 585 .183* 224 .070*
WBT 2 3200 563 .176 277 .087
WBR f 918 649
TOTAL CAPACITY UTILIZATION .725 .818 TOTAL CAPACITY UTILIZATION .726 .820 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
137
.043
94 .029
NBT
4 6400
1864
.291*
2110
.330*
NBR
f
132
570
SBL
2 3200
597
.187*
1162
.363*
SBT
4 6400
2540
.397
2534
.396
SBR
f
19 48
EBL
2 3200
45 .014
30 .009
EBT
2 3200
291
.091*
347
.108*
EBR
1 1600
79 .049
48 .030
WBL
2 3200
596
.186*
236
.074*
WBT
2 3200
565
.177
280
.088
WBR
f
919
649
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
137
.043
94 .029
NBT
4 6400
1868
.292*
2112
.330*
NBR
f
132
570
SBL
2 3200
597
.187*
1162
.363*
SBT
4 6400
2541
.397
2538
.397
SBR
f
19 49
EBL
2 3200
46 .014
31 .010
EBT
2 3200
292
.091*
348
.109*
EBR
1 1600
79 .049
48 .030
WBL
2 3200
596
.186*
236
.074*
WBT
2 3200
565
.177
281
.088
WBR
f
919
649
TOTAL CAPACITY UTILIZATION .755 .875 TOTAL CAPACITY UTILIZATION .756 .876 Stantec A-14
7. MacArthur & Ford/Bonita Cyn
Existing + Growth + Approved + Cumulative
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 137 .043 94 .029
NBT 4 6400 1976 .309* 2162 .338*
NBR f 132 570
SBL 2 3200 597 .187* 1162 .363*
SBT 4 6400 2565 .401 2649 .414
SBR f 19 48
EBL 2 3200 45 .014 30 .009
EBT 2 3200 298 .093* 368 .115*
EBR 1 1600 79 .049 48 .030
WBL 2 3200 596 .186* 236 .074*
WBT 2 3200 586 .183 294 .092
WBR f 919 649
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
137
.043
94 .029
NBT
4 6400
1980
.309*
2164
.338*
NBR
f
132
570
SBL
2 3200
597
.187*
1162
.363*
SBT
4 6400
2566
.401
2653
.415
SBR
f
19 49
EBL
2 3200
46 .014
31 .010
EBT
2 3200
299
.093*
369
.115*
EBR
1 1600
79 .049
48 .030
WBL
2 3200
596
.186*
236
.074*
WBT
2 3200
586
.183
295
.092
WBR
f
919
649
TOTAL CAPACITY UTILIZATION .775 .890 TOTAL CAPACITY UTILIZATION .775 .890 Stantec A-15
8. MacArthur & San Joaquin Hills
Existing
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 121 .038 35 .011
NBT 3 4800 1280 .267* 1440 .300*
NBR 1 1600 22 .014 13 .008
SBL 2 3200 792 .248* 666 .208*
SBT 3 4800 1320 .275 1600 .333
SBR f 851 366
EBL 2 3200 76 .024* 647 .202*
EBT 3 4800 347 .082 313 .090
EBR 0 0 46 117
WBL 1 1600 51 .032 31 .019
WBT 2 3200 360 .113* 292 .091*
WBR f 651 399
Existing + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 121 .038 35 .011
NBT 3 4800 1280 .267* 1440 .300*
NBR 1 1600 22 .014 13 .008
SBL 2 3200 792 .248* 666 .208*
SBT 3 4800 1320 .275 1600 .333
SBR f 852 370
EBL 2 3200 80 .025* 649 .203*
EBT 3 4800 348 .082 314 .090
EBR 0 0 46 117
WBL 1 1600 51 .032 31 .019
WBT 2 3200 360 .113* 293 .092*
WBR f 651 399
TOTAL CAPACITY UTILIZATION .652 .801 TOTAL CAPACITY UTILIZATION .653 .803 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
128
.040
38 .012
NBT
3 4800
1341
.279*
1555
.324*
NBR
1 1600
24 .015
20 .013
SBL
2 3200
825
.258*
694
.217*
SBT
3 4800
1426
.297
1699
.354
SBR
f
952
419
EBL
2 3200
113
.035*
739
.231*
EBT
3 4800
350
.083
316
.090
EBR
0 0
46 117
WBL
1 1600
57 .036
34 .021
WBT
2 3200
363
.113*
295
.092*
WBR
f
651
399
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
128
.040
38 .012
NBT
3 4800
1341
.279*
1555
.324*
NBR
1 1600
24 .015
20 .013
SBL
2 3200
825
.258*
694
.217*
SBT
3 4800
1426
.297
1699
.354
SBR
f
953
423
EBL
2 3200
117
.037*
741
.232*
EBT
3 4800
351
.083
317
.090
EBR
0 0
46 117
WBL
1 1600
57 .036
34 .021
WBT
2 3200
363
.113*
296
.093*
WBR
f
651
399
TOTAL CAPACITY UTILIZATION .685 .864 TOTAL CAPACITY UTILIZATION .687 .866 Stantec A-16
8. MacArthur & San Joaquin Hills
Existing + Growth + Approved + Cumulative
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 128 .040 38 .012
NBT 3 4800 1419 .296* 1623 .338*
NBR 1 1600 24 .015 20 .013
SBL 2 3200 825 .258* 694 .217*
SBT 3 4800 1468 .306 1782 .371
SBR f 969 419
EBL 2 3200 113 .035* 755 .236*
EBT 3 4800 353 .083 325 .092
EBR 0 0 46 117
WBL 1 1600 57 .036 34 .021
WBT 2 3200 372 .116* 301 .094*
WBR f 651 399
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
128
.040
38 .012
NBT
3 4800
1419
.296*
1623
.338*
NBR
1 1600
24 .015
20 .013
SBL
2 3200
825
.258*
694
.217*
SBT
3 4800
1468
.306
1782
.371
SBR
f
970
423
EBL
2 3200
117
.037*
757
.237*
EBT
3 4800
354
.083
326
.092
EBR
0 0
46 117
WBL
1 1600
57 .036
34 .021
WBT
2 3200
372
.116*
302
.094*
WBR
f
651
399
TOTAL CAPACITY UTILIZATION .705 .885 TOTAL CAPACITY UTILIZATION .707 .886 Stantec A-17
9. MacArthur & San Miguel
Existing
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 2 3200 123 .038 91 .028*
NBT 3 4800 1220 .254* 771 .161
NBR 1 1600 147 .092 212 .133
SBL 2 3200 3 .001* 11 .003
SBT 3 4800 780 .163 960 .200*
SBR 1 1600 637 .398 451 .282
EBL 3 4800 192 .040* 668 .139
EBT 2 3200 79 .037 331 .143*
EBR 0 0 38 126
WBL
2 3200
190 .059 225 .070*
WBT
2 3200
261 .083* 173 .065
WBR
0 0
6 35
Right
Turn
Adjustment
SBR .151*
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
123
.038
92 .029*
NBT
3 4800
1220
.254*
771
.161
NBR
1 1600
147
.092
212
.133
SBL
2 3200
3 .001*
11 .003
SBT
3 4800
780
.163
960
.200*
SBR
1 1600
637
.398
451
.282
EBL
3 4800
192
.040*
668
.139
EBT
2 3200
79 .037
331
.143*
EBR
0 0
39 126
WBL
2 3200
190
.059
225
.070*
WBT
2 3200
261
.083*
173
.065
WBR
0 0
6 35
Right
Turn Adjustment
SBR
.151*
TOTAL CAPACITY UTILIZATION .529 .441 TOTAL CAPACITY UTILIZATION .529 .442 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
130
.041
101
.032*
NBT
3 4800
1271
.265*
804
.168
NBR
1 1600
153
.096
220
.138
SBL
2 3200
4 .001*
12 .004
SBT
3 4800
812
.169
999
.208*
SBR
1 1600
719
.449
501
.313
EBL
3 4800
200
.042*
731
.152
EBT
2 3200
83 .041
356
.154*
EBR
0 0
47 138
WBL
2 3200
190
.059
225
.070*
WBT
2 3200
274
.088*
195
.072
WBR
0 0
6 35
Right
Turn Adjustment
SBR
.192*
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
130
.041
102
.032*
NBT
3 4800
1271
.265*
804
.168
NBR
1 1600
153
.096
220
.138
SBL
2 3200
4 .001*
12 .004
SBT
3 4800
812
.169
999
.208*
SBR
1 1600
719
.449
501
.313
EBL
3 4800
200
.042*
731
.152
EBT
2 3200
83 .041
356
.154*
EBR
0 0
48 138
WBL
2 3200
190
.059
225
.070*
WBT
2 3200
274
.088*
195
.072
WBR
0 0
6 35
Right
Turn Adjustment
SBR
.192*
TOTAL CAPACITY UTILIZATION .588 .464 TOTAL CAPACITY UTILIZATION .588 .464 Stantec A-18
9. MacArthur & San Miguel
Existing + Growth + Approved +
Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
167
.052
123
.038*
NBT
3 4800
1349
.281*
872
.182
NBR
1 1600
153
.096
220
.138
SBL
2 3200
4 .001*
12 .004
SBT
3 4800
854
. M
1082
.225*
SBR
1 1600
719
.449
501
.313
EBL
3 4800
200
.042*
731
.152
EBT
2 3200
83 .044
356
.166*
EBR
0 0
59 175
WBL
2 3200
190
.059
225
.070*
WBT
2 3200
274
.088*
195
.072
WBR
0 0
6 35
Right
Turn Adjustment
SBR
.187*
TOTAL CAPACITY UTILIZATION .599 .499
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
167
.052
124
.039*
NBT
3 4800
1349
.281*
872
.182
NBR
1 1600
153
.096
220
.138
SBL
2 3200
4 .001*
12 .004
SBT
3 4800
854
.178
1082
.225*
SBR
1 1600
719
.449
501
.313
EBL
3 4800
200
.042*
731
.152
EBT
2 3200
83 .045
356
.166*
EBR
0 0
60 175
WBL
2 3200
190
.059
225
.070*
WBT
2 3200
274
.088*
195
.072
WBR
0 0
6 35
Right
Turn Adjustment
SBR
.187*
TOTAL CAPACITY UTILIZATION .599 .500
Stantec A-19
10. MacArthur & Coast Hwy
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
793
.248*
981
.307*
SBT
0 0
0 0
SBR
f
247
323
EBL
2 3200
575
.180*
298
.093*
EBT
3 4800
1000
.208
1277
.266
EBR
0 0
0 0
WBL 0 0 0 0
WBT 3 4800 1110 .231* 1136 .237*
WBR f 862 789
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
794
.248*
981
.307*
SBT
0 0
0 0
SBR
f
247
323
EBL
2 3200
575
.180*
298
.093*
EBT
3 4800
1004
.209
1279
.266
EBR
0 0
0 0
WBL 0 0 0 0
WBT 3 4800 1112 .232* 1139 .237*
WBR f 862 790
TOTAL CAPACITY UTILIZATION .659 .637 TOTAL CAPACITY UTILIZATION .660 .637 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
834
.261*
1023
.320*
SBT
0 0
1 0
SBR
f
257
336
EBL
2 3200
599
.187*
311
.097*
EBT
3 4800
1054
.220
1369
.285
EBR
0 0
0 0
WBL
0 0
0 0
WBT
3 4800
1193
.249*
1202
.250*
WBR
f
898
826
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
835
.261*
1023
.320*
SBT
0 0
1 0
SBR
f
257
336
EBL
2 3200
599
.187*
311
.097*
EBT
3 4800
1058
.220
1371
.286
EBR
0 0
0 0
WBL
0 0
0 0
WBT
3 4800
1195
.249*
1205
.251*
WBR
f
898
827
TOTAL CAPACITY UTILIZATION .697 .667 TOTAL CAPACITY UTILIZATION .697 .668 Stantec A-20
10. MacArthur & Coast Hwy
Existing + Growth + Approved + Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
884
.276*
1132
.354*
SBT
0 0
1 0
SBR
f
261
347
EBL
2 3200
605
.189*
320
.100*
EBT
3 4800
1153
.240
1696
.353
EBR
0 0
0 0
WBL 0 0 0 0
WBT 3 4800 1516 .316* 1405 .293*
WBR f 1007 907
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 0
NBT
0 0
0 0
NBR
0 0
0 0
SBL
2 3200
885
.277*
1132
.354*
SBT
0 0
1 0
SBR
f
261
347
EBL
2 3200
605
.189*
320
.100*
EBT
3 4800
1157
.241
1698
.354
EBR
0 0
0 0
WBL
0 0
0 0
WBT
3 4800
1518
.316*
1408
.293*
WBR
f
1007
908
TOTAL CAPACITY UTILIZATION .781 .747 TOTAL CAPACITY UTILIZATION .782 .747 Stantec A-21
11. Santa Cruz & San Joaquin Hills
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
70 .022*
620
.194*
NBT
1 1600
4 .011
14 .093
NBR
0 0
13 135
SBL
1 1600
10 .006
9 .006
SBT
2 3200
7 .004*
5 .003*
SBR
0 0
64 .040
24 .015
EBL
1 1600
49 .031
72 .045
EBT
3 4800
512
.160*
486
.138*
EBR
0 0
292
.183
178
WBL
1 1600
115
.072*
45 .028*
WBT
3 4800
265
.057
444
AU
WBR
0 0
7 20
Right
Turn Adjustment
EBR
.006*
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
73 .023*
621
.194*
NBT
1 1600
4 .011
14 .094
NBR
0 0
14 136
SBL
1 1600
10 .006
9 .006
SBT
2 3200
7 .004*
5 .003*
SBR
0 0
64 .040
24 .015
EBL
1 1600
49 .031
72 .045
EBT
3 4800
516
.161*
488
.140*
EBR
0 0
293
.183
183
WBL
1 1600
116 .073* 50 .031*
WBT
3 4800
265 .057 444 AU
WBR
0 0
7 20
Right
Turn
Adjustment
EBR .005*
TOTAL CAPACITY UTILIZATION .264 .363 TOTAL CAPACITY UTILIZATION .266 .368 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
99 .031*
631
.197*
NBT
1 1600
4 .012
14 .094
NBR
0 0
15 136
SBL
1 1600
10 .006
10 .006
SBT
2 3200
8 .005*
5 .003*
SBR
0 0
64 .040
24 .015
EBL
1 1600
49 .031
72 .045
EBT
3 4800
587
.183*
515
.148*
EBR
0 0
296
.185
196
WBL
1 1600
117
.073*
47 .029*
WBT
3 4800
275
.059
517
.112
WBR
0 0
7 20
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
102
.032*
632
.198*
NBT
1 1600
4 .013
14 .094
NBR
0 0
16 137
SBL
1 1600
10 .006
10 .006
SBT
2 3200
8 .005*
5 .003*
SBR
0 0
64 .040
24 .015
EBL
1 1600
49 .031
72 .045
EBT
3 4800
591
.185*
517
.150*
EBR
0 0
297
.186
201
WBL
1 1600
118
.074*
52 .033*
WBT
3 4800
275
.059
517
.112
WBR
0 0
7 20
TOTAL CAPACITY UTILIZATION .292 .377 TOTAL CAPACITY UTILIZATION .296 .384 Stantec A-22
11. Santa Cruz & San Joaquin Hills
Existing + Growth + Approved +
Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
99 .031*
647
.202*
NBT
1 1600
4 .012
14 .094
NBR
0 0
15 136
SBL
1 1600
10 .006
10 .006
SBT
2 3200
8 .005*
5 .003*
SBR
0 0
64 .040
24 .015
EBL
1 1600
49 .031
72 .045
EBT
3 4800
587
.183*
515
.148*
EBR
0 0
313
.196
196
WBL
1 1600
117
.073*
47 .029*
WBT
3 4800
275
.059
517
.112
WBR
0 0
7 20
TOTAL CAPACITY UTILIZATION .292 .382
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
2 3200
102
.032*
648
.203*
NBT
1 1600
4 .013
14 .094
NBR
0 0
16 137
SBL
1 1600
10 .006
10 .006
SBT
2 3200
8 .005*
5 .003*
SBR
0 0
64 .040
24 .015
EBL
1 1600
49 .031
72 .045
EBT
3 4800
591
.185*
517
.150*
EBR
0 0
314
.196
201
WBL
1 1600
118
.074*
52 .033*
WBT
3 4800
275
.059
517
.112
WBR
0 0
7 20
TOTAL CAPACITY UTILIZATION .296 .389
Stantec A-23
12. Santa Cruz & San Clemente
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
26 .016*
98 .061*
NBT
3 4800
52 .016
432
.097
NBR
0 0
35 .022
35 SBL
1 1600
52 .033
30 .019
SBT
2 3200
140
.088*
204
.083*
SBR
0 0
161
.101
61 EBL
0 0
19 280
EBT
2 3200
30 .025*
11 .094*
EBR
0 0
46 .029
45 .028
WBL 1.5 10 28
WBT 0.5 3200 9 .006* 20 .015*
WBR 1 1600 16 .010 54 .034
Note: Assumes E/W Split Phasing
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
26 .016*
100
.063*
NBT
3 4800
52 .016
432
.097
NBR
0 0
35 .022
35 SBL
1 1600
52 .033
30 .019
SBT
2 3200
142
.089*
205
.085*
SBR
0 0
162
.101
66 EBL
0 0
23 282
EBT
2 3200
30 .026*
11 .095*
EBR
0 0
47 .029
46 .029
WBL 1.5 10 28
WBT 0.5 3200 9 .006* 20 .015*
WBR 1 1600 16 .010 54 .034
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .135 .253 TOTAL CAPACITY UTILIZATION .137 .258 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
26 .016*
98 .061*
NBT
3 4800
83 .025
444
.100
NBR
0 0
35 35
SBL
1 1600
52 .033
30 .019
SBT
2 3200
147
.092*
224
.089*
SBR
0 0
161
.101
61 EBL
0 0
19 280
EBT
2 3200
30 .025*
11 .094*
EBR
0 0
46 .029
45 .028
WBL
1.5 10
28 WBT
0.5 3200
9 .006*
20 .015*
WBR
1 1600
16 .010
54 .034
Note:
Assumes
E/W Split
Phasing
Existing + Growth + Approved + Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 26 .016* 100 .063*
NBT 3 4800 83 .025 444 .100
NBR 0 0 35 35
SBL 1 1600 52 .033 30 .019
SBT 2 3200 149 .093* 225 .091*
SBR 0 0 162 .101 66
EBL 0 0 23 282
EBT 2 3200 30 .026* 11 .095*
EBR 0 0 47 .029 46 .029
WBL 1.5 10 28
WBT 0.5 3200 9 .006* 20 .015*
WBR 1 1600 16 .010 54 .034
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .139 .259 TOTAL CAPACITY UTILIZATION .141 .264 Stantec A-24
12. Santa Cruz & San Clemente
Existing + Growth + Approved + Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
26 .016*
98 .061*
NBT
3 4800
83 .025
460
.103
NBR
0 0
35 35
SBL
1 1600
52 .033
30 .019
SBT
2 3200
164
.102*
224
.089*
SBR
0 0
161
61 EBL
0 0
19 280
EBT
2 3200
30 .025*
11 .094*
EBR
0 0
46 .029
45 .028
WBL 1.5 10 28
WBT 0.5 3200 9 .006* 20 .015*
WBR 1 1600 16 .010 54 .034
Note: Assumes E/W Split Phasing
Existing + Growth + Approved + Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
26 .016*
100
.063*
NBT
3 4800
83 .025
460
.103
NBR
0 0
35 35
SBL
1 1600
52 .033
30 .019
SBT
2 3200
166
.103*
225
.091*
SBR
0 0
162
66 EBL
0 0
23 282
EBT
2 3200
30 .026*
11 .095*
EBR
0 0
47 .029
46 .029
WBL
1.5 10
28 WBT
0.5 3200
9 .006*
20 .015*
WBR
1 1600
16 .010
54 .034
Note:
Assumes
E/W Split
Phasing
TOTAL CAPACITY UTILIZATION .149 .259 TOTAL CAPACITY UTILIZATION .151 .264 Stantec A-25
13. Santa Cruz & Newport Center
Existing
AM PK HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
19 1.0121*
50 NBT
2 3200
19 .014
159
.078*
NBR
0 0
6 39
SBL
1 1600
84 .053
59 .037*
SBT
1 1600
123
.V7*
96 .060
SBR
1 1600
55 .034
80 .050
EBL
1 1600
46 .029*
157
.098*
EBT
2 3200
70 .022
93 .029
EBR
1 1600
16 .010
27 . M
WBL
1 1600
8 .005
29 .018
WBT
2 3200
88 .028*
92 .029*
WBR
1 1600
75 .047
193
.121
Right
Turn Adjustment
WBR
.064*
Existing + Project
AM PK HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
19 1.0121*
50 NBT
2 3200
19 .014
160
.078*
NBR
0 0
6 39
SBL
1 1600
85 .053
59 .037*
SBT
1 1600
124
.078*
96 .060
SBR
1 1600
56 .035
80 .050
EBL
1 1600
46 .029*
157
.098*
EBT
2 3200
70 .022
93 .029
EBR
1 1600
16 .010
27 .017
WBL
1 1600
8 .005 29
.018
WBT
2 3200
88 .028* 92
.029*
WBR
1 1600
75 .047 194
.121
Right
Turn
Adjustment
WBR
.064*
TOTAL CAPACITY UTILIZATION .146 .306 TOTAL CAPACITY UTILIZATION .147 .306 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
19 1.0121*
50 NBT
2 3200
35 .019
165
.079*
NBR
0 0
6 39
SBL
1 1600
86 .054
64 .040*
SBT
1 1600
126
.079*
106
.066
SBR
1 1600
57 .036
85 .053
EBL
1 1600
54 .034*
160
.100*
EBT
2 3200
70 .022
93 .029
EBR
1 1600
16 .010
27 .017
WBL
1 1600
8 .005
29 .018
WBT
2 3200
88 .028*
92 .029*
WBR
1 1600
82 .051
196
.123
Right
Turn Adjustment
WBR
.064*
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
19 1.0121*
50 NBT
2 3200
35 .019
166
.080*
NBR
0 0
6 39
SBL
1 1600
87 .054
64 .040*
SBT
1 1600
127
.079*
106
.066
SBR
1 1600
58 .036
85 .053
EBL
1 1600
54 .034*
160
.100*
EBT
2 3200
70 .022
93 .029
EBR
1 1600
16 .010
27 .017
WBL
1 1600
8 .005
29 .018
WBT
2 3200
88 .028*
92 .029*
WBR
1 1600
82 .051
197
.123
Right
Turn Adjustment
WBR
.064*
TOTAL CAPACITY UTILIZATION .153 .312 TOTAL CAPACITY UTILIZATION .153 .313 Stantec A-26
13. Santa Cruz & Newport Center
Existing + Growth + Approved +
Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
19 1.0121*
50 NBT
2 3200
35 .019
173
.082*
NBR
0 0
6 39
SBL
1 1600
86 .054
64 .040*
SBT
1 1600
135
.084*
106
.066
SBR
1 1600
65 .041
85 .053
EBL
1 1600
54 .034*
168
.105*
EBT
2 3200
73 .023
95 .030
EBR
1 1600
16 .010
27 .017
WBL
1 1600
8 .005
29 .018
WBT
2 3200
89 .028*
96 .030*
WBR
1 1600
82 .051
196
.123
Right
Turn Adjustment
WBR
.063*
TOTAL CAPACITY UTILIZATION .158 .320
Existing + Growth + Approved +
Cumulative + Project
AM PK HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
19 1.0121*
50 NBT
2 3200
35 .019
174
.082*
NBR
0 0
6 39
SBL
1 1600
87 .054
64 .040*
SBT
1 1600
136
.085*
106
.066
SBR
1 1600
66 .041
85 .053
EBL
1 1600
54 .034*
168
.105*
EBT
2 3200
73 .023
95 .030
EBR
1 1600
16 .010
27 .017
WBL
1 1600
8 .005
29 .018
WBT
2 3200
89 .028*
96 .030*
WBR
1 1600
82 .051
197
.123
Right
Turn Adjustment
WBR
.063*
TOTAL CAPACITY UTILIZATION .159 .320
Stantec A-27
14. Santa Rosa & San Joaquin Hills
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
32 .020
221
.138*
NBT
1 1600
16 .010*
25 .016
NBR
1 1600
75 .047
443
.277
SBL
1 1600
81 .051*
73 .046
SBT
1 1600
12 .008
11 .007*
SBR
1 1600
39 .024
59 .037
EBL
1 1600
27 .017
67 .042
EBT
3 4800
265
.083*
550
.142*
EBR
0 0
207
.129
133
WBL
2 3200
447
.140*
374
.117*
WBT
3 4800
457
.116
280
.075
WBR
0 0
101
79 Right
Turn Adjustment
EBR
.006*
NBR
.090*
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
32 .020
221
.138*
NBT
1 1600
16 .010*
25 .016
NBR
1 1600
75 .047
443
.277
SBL
1 1600
81 .051*
73 .046
SBT
1 1600
12 .008
11 .007*
SBR
1 1600
39 .024
59 .037
EBL
1 1600
27 .017
67 .042
EBT
3 4800
270
.084*
553
.143*
EBR
0 0
207
.129
133
WBL
2 3200
447
.140*
374
.117*
WBT
3 4800
458
.116
285
.076
WBR
0 0
101
79 Right
Turn Adjustment
EBR
.005*
NBR
.090*
TOTAL CAPACITY UTILIZATION .290 .494 TOTAL CAPACITY UTILIZATION .290 .495 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
51 .032
299
.187*
NBT
1 1600
16 .010*
25 .016
NBR
1 1600
102
.064
473
.296
SBL
1 1600
81 .051*
73 .046
SBT
1 1600
12 .008
11 .007*
SBR
1 1600
39 .024
59 .037
EBL
1 1600
28 .018
67 .042
EBT
3 4800
271
.085*
559
.150*
EBR
0 0
284
.178
163
WBL
2 3200
452
.141*
401
.125*
WBT
3 4800
462
.117
287
.076
WBR
0 0
101
79 Right
Turn Adjustment
EBR
.053*
NBR
.054*
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
51 .032
299
.187*
NBT
1 1600
16 .010*
25 .016
NBR
1 1600
102
.064
473
.296
SBL
1 1600
81 .051*
73 .046
SBT
1 1600
12 .008
11 .007*
SBR
1 1600
39 .024
59 .037
EBL
1 1600
28 .018
67 .042
EBT
3 4800
276
.086*
562
.151*
EBR
0 0
284
.178
163
WBL
2 3200
452
.141*
401
.120*
WBT
3 4800
463
.118
292
.0-
WBR
0 0
101
79 Right
Turn Adjustment
EBR
.052*
NBR
.054*
TOTAL CAPACITY UTILIZATION .340 .523 TOTAL CAPACITY UTILIZATION .340 .524 Stantec A-28
14. Santa Rosa & San Joaquin Hills
Existing + Growth + Approved +
Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
51 .032
299
.187*
NBT
1 1600
16 .010*
25 .016
NBR
1 1600
105
.066
498
.311
SBL
1 1600
81 .051*
73 .046
SBT
1 1600
12 .008
11 .007*
SBR
1 1600
39 .024
59 .037
EBL
1 1600
28 .018
67 .042
EBT
3 4800
271
.085*
559
.150*
EBR
0 0
284
.M
163
WBL
2 3200
478
.149*
407
.127*
WBT
3 4800
462
.117
287
.076
WBR
0 0
101
79 Right
Turn Adjustment
EBR
.053*
NBR
.068*
TOTAL CAPACITY UTILIZATION .348 .539
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
51 .032
299
.187*
NBT
1 1600
16 .010*
25 .016
NBR
1 1600
105
.066
498
.311
SBL
1 1600
81 .051*
73 .046
SBT
1 1600
12 .008
11 .007*
SBR
1 1600
39 .024
59 .037
EBL
1 1600
28 .018
67 .042
EBT
3 4800
276
.086*
562
.151*
EBR
0 0
284
.178
163
WBL
2 3200
478
.149*
407
.127*
WBT
3 4800
463
.118
292
. M
WBR
0 0
101
79 Right
Turn Adjustment
EBR
.052*
NBR
.068*
TOTAL CAPACITY UTILIZATION .348 .540
Stantec A-29
15. Newport Center & Santa Rosa
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
38 .024
83 .052
NBT
2 3200
61 .019*
126
.039*
NBR
1 1600
94 .059
273
.171
SBL
1 1600
54 .034*
141
.088*
SBT
2 3200
37 .012
121
.038
SBR
1 1600
4 .003
31 .019
EBL
0 0
6 1.0041*
12 EBT
2 3200
37 .019
147
.068*
EBR
0 0
18 57
WBL
0 0
67 102 1.0641*
WBT
2 3200
140
.065*
238
.106
WBR
1 1600
111
.069
112
.070
Right
Turn Adjustment
NBR
.002*
NBR
.084*
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL 1
1600
38 .024
83 .052
NBT 2
3200
61 .019*
127
.040*
NBR 1
1600
94 .059
273
.171
SBL
1 1600
54 .034*
141
.088*
SBT
2 3200
38 .012
121
.038
SBR
1 1600
4 .003
31 .019
EBL
0 0
6 {.0041*
12 EBT
2 3200
37 .019
147
.068*
EBR
0 0
18 57
WBL
0 0
67 102
1.0641*
WBT
2 3200
140
.065*
238
.106
WBR
1 1600
ill
.069
112
.070
Right
Turn
Adjustment
NBR
.002*
NBR
.083*
TOTAL CAPACITY UTILIZATION .124 .343 TOTAL CAPACITY UTILIZATION .124 .343 Existing + Growth + Approved
AM PK HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
38 .024
83 .052
NBT
2 3200
61 .019*
126
.039*
NBR
1 1600
105
.066
300
.188
SBL
1 1600
66 .041*
168
.105*
SBT
2 3200
37 .012
121
.038
SBR
1 1600
4 .003
31 .019
EBL
0 0
6 {.0041*
12 EBT
2 3200
60 .026
201
.084*
EBR
0 0
18 57
WBL
0 0
87 116 1.0721*
WBT
2 3200
181
.084*
266
.119
WBR
1 1600
132
.083
126
.079
Right
Turn Adjustment
NBR
.095*
Existing + Growth + Approved +
Project
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
38 .024
83 .052
NBT
2 3200
61 .019*
127
.040*
NBR
1 1600
105
.066
300
.188
SBL
1 1600
66 .041*
168
.105*
SBT
2 3200
38 .012
121
.038
SBR
1 1600
4 .003
31 .019
EBL
0 0
6 {.0041*
12 EBT
2 3200
60 .026
201
.084*
EBR
0 0
18 57
WBL
0 0
87 116
1.0721*
WBT
2 3200
181
.084*
266
.119
WBR
1 1600
132
.083
126
.079
Right
Turn Adjustment
NBR
.094*
TOTAL CAPACITY UTILIZATION .148 .395 TOTAL CAPACITY UTILIZATION .148 .395 Stantec A-30
15. Newport Center & Santa Rosa
Existing + Growth + Approved + Cumulative
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
38 .024
83 .052
NBT
2 3200
67 .021*
138
.043*
NBR
1 1600
105
.066
308
.193
SBL
1 1600
66 .041*
168
.105*
SBT
2 3200
47 .015
131
.041
SBR
1 1600
4 .003
31 .019
EBL
0 0
6 1.0041*
12 EBT
2 3200
60 .026
209
.087*
EBR
0 0
18 57
WBL
0 0
95 116 1.0721*
WBT
2 3200
190
.089*
266
.119
WBR
1 1600
132
.083
126
.079
Right
Turn Adjustment
NBR
.096*
TOTAL CAPACITY UTILIZATION .155 .403
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
38 .024
83 .052
NBT
2 3200
67 .021*
139
.043*
NBR
1 1600
105
.066
308
.193
SBL
1 1600
66 .041*
168
.105*
SBT
2 3200
48 .015
131
.041
SBR
1 1600
4 .003
31 .019
EBL
0 0
6 {.0041*
12 EBT
2 3200
60 .026
209
.087*
EBR
0 0
18 57
WBL
0 0
95 116 1.0721*
WBT
2 3200
190
.089*
266
.119
WBR
1 1600
132
.083
126
.079
Right
Turn Adjustment
NBR
.096*
TOTAL CAPACITY UTILIZATION .155 .403
Stantec A-31
16. Newport Center & San Miguel
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
25 .016
77 .048*
NBT
2 3200
139
.043*
124
.039
NBR
1 1600
81 .051
213
.133
SBL
1 1600
41 .026*
78 .049
SBT
2 3200
49 .015
171
.053*
SBR
1 1600
6 .004
41 .026
EBL
0 0
0 16
EBT
2 3200
17 .006*
204
.103*
EBR
0 0
2 109
WBL 1 1600 99 .062* 190 .119*
WBT 2 3200 57 .036 201 .116
WBR 0 0 128 .080 170
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
25 .016
77 .048*
NBT
2 3200
139
.043*
124
.039
NBR
1 1600
81 .051
213
.133
SBL
1 1600
42 .026*
78 .049
SBT
2 3200
49 .015
171
.053*
SBR
1 1600
6 .004
41 .026
EBL
0 0
0 16
EBT
2 3200
17 .006*
204
.103*
EBR
0 0
2 109
WBL 1 1600 99 .062* 190 .119*
WBT 2 3200 57 .036 201 .116
WBR 0 0 128 .080 171
TOTAL CAPACITY UTILIZATION .137 .323 TOTAL CAPACITY UTILIZATION .137 .323 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
25 .016
77 .048*
NBT
2 3200
139
.043*
124
.039
NBR
1 1600
91 .057
222
.139
SBL
1 1600
51 .032*
86 .054
SBT
2 3200
49 .015
171
.053*
SBR
1 1600
6 .004
41 .026
EBL
0 0
0 16
EBT
2 3200
37 .012*
222
.108*
EBR
0 0
2 109
WBL
1 1600
100
.063*
202
.126*
WBT
2 3200
59 .037
225
.127
WBR
0 0
129
.081
182
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
25 .016
77 .048*
NBT
2 3200
139
.043*
124
.039
NBR
1 1600
91 .057
222
.139
SBL
1 1600
52 .033*
86 .054
SBT
2 3200
49 .015
171
.053*
SBR
1 1600
6 .004
41 .026
EBL
0 0
0 16
EBT
2 3200
37 .012*
222
.108*
EBR
0 0
2 109
WBL
1 1600
100
.063*
202
.126*
WBT
2 3200
59 .037
225
.128
WBR
0 0
129
.081
183
TOTAL CAPACITY UTILIZATION .150 .335 TOTAL CAPACITY UTILIZATION .151 .335 Stantec A-32
16. Newport Center & San Miguel
Existing + Growth + Approved + Cumulative
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
25 .016
77 .048*
NBT
2 3200
142
.044*
127
.040
NBR
1 1600
91 .057
222
.139
SBL
1 1600
51 .032*
86 .054
SBT
2 3200
50 .016
175
.055*
SBR
1 1600
14 .009
41 .026
EBL
0 0
0 24
EBT
2 3200
49 .016*
259
.123*
EBR
0 0
2 109
WBL
1 1600
100
.063*
202
.126*
WBT
2 3200
96 .060
247
.134
WBR
0 0
129
.081
182
TOTAL CAPACITY UTILIZATION .155 .352
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
25 .016
77 .048*
NBT
2 3200
142
.044*
127
.040
NBR
1 1600
91 .057
222
.139
SBL
1 1600
52 .033*
86 .054
SBT
2 3200
50 .016
175
.055*
SBR
1 1600
14 .009
41 .026
EBL
0 0
0 24
EBT
2 3200
49 .016*
259
.123*
EBR
0 0
2 109
WBL
1 1600
100
.063*
202
.126*
WBT
2 3200
96 .060
247
.134
WBR
0 0
129
.081
183
TOTAL CAPACITY UTILIZATION .156 .352
Stantec A-33
17. Avocado & San Miguel
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
107
.067*
137
.086*
NBT
1 1600
73 .046
33 .021
NBR
1 1600
145
.091
440
.275
SBL
2 3200
48 .015
139
.043
SBT
1 1600
44 .038*
110
.079*
SBR
0 0
16 17
EBL
1 1600
4 .003*
3 .002
EBT
3 4800
138
.036
605
.145*
EBR
0 0
36 91
WBL
2 3200
512
.160
277
.087*
WBT
2 3200
471
.198*
514
.175
WBR
0 0
162
46 Right
Turn Adjustment
NBR
.088*
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
107
.067*
137
.086*
NBT
1 1600
73 .046
33 .021
NBR
1 1600
145
.091
440
.275
SBL
2 3200
48 .015
139
.043
SBT
1 1600
44 .038*
110
.079*
SBR
0 0
16 17
EBL
1 1600
4 .003*
3 .002
EBT
3 4800
139
.036
605
.145*
EBR
0 0
36 91
WBL
2 3200
512 .160 277 .087*
WBT
2 3200
471 .198* 515 .175
WBR
0 0
162 46
Right
Turn
Adjustment
NBR .088*
TOTAL CAPACITY UTILIZATION .306 .485 TOTAL CAPACITY UTILIZATION .306 .485 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
Ill
.069*
170
.106*
NBT
1 1600
116
.073
44 .028
NBR
1 1600
154
.096
506
.316
SBL
2 3200
50 .016
148
.046
SBT
1 1600
54 .044*
156
.108*
SBR
0 0
16 17
EBL
1 1600
4 .003
3 .002
EBT
3 4800
146
.045*
626
.152*
EBR
0 0
68 105
WBL
2 3200
567
.177*
313
.098*
WBT
2 3200
471
.202
529
.181
WBR
0 0
174
51 Right
Turn Adjustment
NBR
.074*
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
Ill
.069*
170
.106*
NBT
1 1600
116
.073
44 .028
NBR
1 1600
154
.096
506
.316
SBL
2 3200
50 .016
148
.046
SBT
1 1600
54 .044*
156
.108*
SBR
0 0
16 17
EBL
1 1600
4 .003
3 .002
EBT
3 4800
147
.045*
626
.152*
EBR
0 0
68 105
WBL
2 3200
567
.177*
313
.098*
WBT
2 3200
471
.202
530
.182
WBR
0 0
174
51 Right
Turn Adjustment
NBR
.074*
TOTAL CAPACITY UTILIZATION .335 .538 TOTAL CAPACITY UTILIZATION .335 .538 Stantec A-34
17. Avocado & San Miguel
Existing + Growth + Approved +
Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
111
.069*
170
.106*
NBT
1 1600
116
.073
44 .028
NBR
1 1600
154
.096
506
.316
SBL
2 3200
50 .016
148
.046
SBT
1 1600
54 .044*
156
.108*
SBR
0 0
16 17
EBL
1 1600
4 .003
3 .002
EBT
3 4800
158
.047*
663
.160*
EBR
0 0
68 105
WBL
2 3200
567
.177*
313
.098*
WBT
2 3200
508
.213
551
.188
WBR
0 0
174
51 Right
Turn Adjustment
NBR
.074*
TOTAL CAPACITY UTILIZATION .337 .546
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
111
.069*
170
.106*
NBT
1 1600
116
.073
44 .028
NBR
1 1600
154
.096
506
.316
SBL
2 3200
50 .016
148
.046
SBT
1 1600
54 .044*
156
.108*
SBR
0 0
16 17
EBL
1 1600
4 .003
3 .002
EBT
3 4800
159
.047*
663
.160*
EBR
0 0
68 105
WBL
2 3200
567
.177*
313
.098*
WBT
2 3200
508
.213
552
.188
WBR
0 0
174
51 Right
Turn Adjustment
NBR
.074*
TOTAL CAPACITY UTILIZATION .337 .546
Stantec A-35
18. Newport Center & Newport Center (Circle)
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
162
.101*
127
.079*
NBT
2 3200
40 .013
137
.043
NBR
f
242
133
SBL
1 1600
5 .003
25 .016
SBT
2 3200
6 .002*
137
.044*
SBR
0 0
0 5
EBL
1 1600
72 .045*
13 .008
EBT
2 3200
42 .013
114
.036*
EBR
f
8 221
WBL 1 1600 6 .004 317 .198*
WBT 2 3200 88 .028* 100 .031
WBR 1 1600 91 .057 43 .027
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
163
.102*
128
.080*
NBT
2 3200
40 .013
137
.043
NBR
f
242
133
SBL
1 1600
5 .003
25 .016
SBT
2 3200
6 .002*
137
.044*
SBR
0 0
0 5
EBL
1 1600
72 .045*
13 .008
EBT
2 3200
42 .013
114
.036*
EBR
f
10 222
WBL 1 1600 6 .004 317 .198*
WBT 2 3200 88 .028* 100 .031
WBR 1 1600 91 .057 43 .027
TOTAL CAPACITY UTILIZATION .176 .357 TOTAL CAPACITY UTILIZATION .177 .358 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
166
.104*
134
.084*
NBT
2 3200
49 .015
153
.048
NBR
f
246
141
SBL
1 1600
5 .003
25 .016
SBT
2 3200
19 .006*
162
.052*
SBR
0 0
0 5
EBL
1 1600
72 .045*
13 .008
EBT
2 3200
42 .013
114
.036*
EBR
f
14 234
WBL
1 1600
12 .008
329
.206*
WBT
2 3200
88 .028*
100
.031
WBR
1 1600
91 .057
43 .027
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
167
.104*
135
.084*
NBT
2 3200
49 .015
153
.048
NBR
f
246
141
SBL
1 1600
5 .003
25 .016
SBT
2 3200
19 .006*
162
.052*
SBR
0 0
0 5
EBL
1 1600
72 .045*
13 .008
EBT
2 3200
42 .013
114
.036*
EBR
f
16 235
WBL
1 1600
12 .008
329
.206*
WBT
2 3200
88 .028*
100
.031
WBR
1 1600
91 .057
43 .027
TOTAL CAPACITY UTILIZATION .183 .378 TOTAL CAPACITY UTILIZATION .183 .378 Stantec A-36
18. Newport Center & Newport Center (Circle)
Existing + Growth + Approved + Cumulative
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
169
.106*
136
.085*
NBT
2 3200
56 .018
159
.050
NBR
f
249
144
SBL
1 1600
5 .003
25 .016
SBT
2 3200
22 .007*
171
.055*
SBR
0 0
0 5
EBL
1 1600
72 .045*
13 .008
EBT
2 3200
42 .013
114
.036*
EBR
f
15 238
WBL
1 1600
13 .008
333
.208*
WBT
2 3200
88 .028*
100
.031
WBR
1 1600
91 .057
43 .027
TOTAL CAPACITY UTILIZATION .186 .384
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
170
.106*
137
.086*
NBT
2 3200
56 .018
159
.050
NBR
f
249
144
SBL
1 1600
5 .003
25 .016
SBT
2 3200
22 .007*
171
.055*
SBR
0 0
0 5
EBL
1 1600
72 .045*
13 .008
EBT
2 3200
42 .013
114
.036*
EBR
f
17 239
WBL
1 1600
13 .008
333
.208*
WBT
2 3200
88 .028*
100
.031
WBR
1 1600
91 .057
43 .027
TOTAL CAPACITY UTILIZATION .186 .385
Stantec A-37
19. Santa Barbara & San Clemente
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 1
NBT
3 4800
57 .013*
369
.080*
NBR
0 0
6 14
SBL
1 1600
404
.253*
49 .031*
SBT
2 3200
312
.098
202
.063
SBR
0 0
0 0
EBL
0 0
0 0
EBT
0 0
0 0
EBR
0 0
0 0
WBL
1 1600
12 .008*
25 .016*
WBT
0 0
0 0
WBR
1 1600
53 .033
381
.238
Right
Turn Adjustment
WBR
.199*
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 1
NBT
3 4800
57 .013*
369
.080*
NBR
0 0
7 15
SBL
1 1600
404
.253*
51 .032*
SBT
2 3200
312
.098
202
.063
SBR
0 0
0 0
EBL
0 0
0 0
EBT
0 0
0 0
EBR
0 0
0 0
WBL
1 1600
13 .008*
26 .016*
WBT
0 0
0 0
WBR
1 1600
58 .036
384 .240
Right
Turn
Adjustment
WBR .200*
TOTAL CAPACITY UTILIZATION .274 .326 TOTAL CAPACITY UTILIZATION .274 .328 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 1
NBT
3 4800
94 .021*
389
.084*
NBR
0 0
6 14
SBL
1 1600
404
.253*
49 .031*
SBT
2 3200
320
.100
229
.072
SBR
0 0
0 0
EBL
0 0
0 0
EBT
0 0
0 0
EBR
0 0
0 0
WBL
1 1600
12 .008*
25 .016*
WBT
0 0
0 0
WBR
1 1600
53 .033
381
.238
Right
Turn Adjustment
WBR
.199*
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 1
NBT
3 4800
94 .021*
389
.084*
NBR
0 0
7 15
SBL
1 1600
404
.253*
51 .032*
SBT
2 3200
320
.100
229
.072
SBR
0 0
0 0
EBL
0 0
0 0
EBT
0 0
0 0
EBR
0 0
0 0
WBL
1 1600
13 .008*
26 .016*
WBT
0 0
0 0
WBR
1 1600
58 .036
384
.240
Right
Turn Adjustment
WBR
.200*
TOTAL CAPACITY UTILIZATION .282 .330 TOTAL CAPACITY UTILIZATION .282 .332 Stantec A-38
19. Santa Barbara & San Clemente
Existing + Growth + Approved +
Cumulative
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 1
NBT
3 4800
94 .021*
389
.084*
NBR
0 0
6 14
SBL
1 1600
404
.253*
49 .031*
SBT
2 3200
320
.100
229
.072
SBR
0 0
0 0
EBL
0 0
0 0
EBT
0 0
0 0
EBR
0 0
0 0
WBL
1 1600
12 .008*
25 .016*
WBT
0 0
0 0
WBR
1 1600
53 .033
381
.238
Right
Turn Adjustment
WBR
.199*
TOTAL CAPACITY UTILIZATION .282 .330
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0 0
0 1
NBT
3 4800
94 .021*
389
.084*
NBR
0 0
7 15
SBL
1 1600
404
.253*
51 .032*
SBT
2 3200
320
.100
229
.072
SBR
0 0
0 0
EBL
0 0
0 0
EBT
0 0
0 0
EBR
0 0
0 0
WBL
1 1600
13 .008*
26 .016*
WBT
0 0
0 0
WBR
1 1600
58 .036
384
.240
Right
Turn Adjustment
WBR
.200*
TOTAL CAPACITY UTILIZATION .282 .332
Stantec A-39
20. Newport Center & Santa Barbara
Existing
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
88 .055*
122
.076*
NBT
2 3200
139
.043
124
.039
NBR
1 1600
20 .013
30 .019
SBL
1 1600
24 .015
37 .023
SBT
2 3200
65 .020*
201
.063*
SBR
1 1600
48 .030
91 .057
EBL
1 1600
55 .034*
45 .028*
EBT
2 3200
28 .018
71 .044
EBR
0 0
113
.071
137
.086
WBL 0 0 8 29
WBT 2 3200 8 .007* 62 .043*
WBR 0 0 5 47
Existing + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
89 .056*
123
. M*
NBT
2 3200
139
.043
124
.039
NBR
1 1600
20 .013
30 .019
SBL
1 1600
24 .015
37 .023
SBT
2 3200
66 .021*
201
.063*
SBR
1 1600
48 .030
91 .057
EBL
1 1600
55 .034*
45 .028*
EBT
2 3200
28 .018
71 .044
EBR
0 0
114
.071
138
.086
WBL 0 0 8 29
WBT 2 3200 8 .007* 62 .043*
WBR 0 0 5 47
TOTAL CAPACITY UTILIZATION .116 .210 TOTAL CAPACITY UTILIZATION .118 .211 Existing + Growth + Approved
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
97 .061*
127
.079*
NBT
2 3200
139
.043
124
.039
NBR
1 1600
20 .013
30 .019
SBL
1 1600
24 .015
37 .023
SBT
2 3200
65 .020*
201
.063*
SBR
1 1600
57 .036
96 .060
EBL
1 1600
57 .036*
52 .033*
EBT
2 3200
32 .020
85 .053
EBR
0 0
115
.072
143
.089
WBL
0 0
8 29
WBT
2 3200
27 .013*
72 .046*
WBR
0 0
5 47
Existing + Growth + Approved +
Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
98 .061*
128
.080*
NBT
2 3200
139
.043
124
.039
NBR
1 1600
20 .013
30 .019
SBL
1 1600
24 .015
37 .023
SBT
2 3200
66 .021*
201
.063*
SBR
1 1600
57 .036
96 .060
EBL
1 1600
57 .036*
52 .033*
EBT
2 3200
32 .020
85 .053
EBR
0 0
116
.073
144
.090
WBL
0 0
8 29
WBT
2 3200
27 .013*
72 .046*
WBR
0 0
5 47
TOTAL CAPACITY UTILIZATION .130 .221 TOTAL CAPACITY UTILIZATION .131 .222 Stantec A-40
20. Newport Center & Santa Barbara
Existing + Growth + Approved + Cumulative
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
97 .061*
127
.079*
NBT
2 3200
142
.044
126
.039
NBR
1 1600
20 .013
30 .019
SBL
1 1600
32 .020
37 .023
SBT
2 3200
66 .021*
205
.064*
SBR
1 1600
57 .036
96 .060
EBL
1 1600
57 .036*
52 .033*
EBT
2 3200
32 .020
85 .053
EBR
0 0
115
.072
143
.089
WBL
0 0
8 29
WBT
2 3200
27 .013*
72 .049*
WBR
0 0
5 55
TOTAL CAPACITY UTILIZATION .131 .225
Existing + Growth + Approved +
Cumulative + Project
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1 1600
98 .061*
128
.080*
NBT
2 3200
142
.044
126
.039
NBR
1 1600
20 .013
30 .019
SBL
1 1600
32 .020
37 .023
SBT
2 3200
67 .021*
205
.064*
SBR
1 1600
57 .036
96 .060
EBL
1 1600
57 .036*
52 .033*
EBT
2 3200
32 .020
85 .053
EBR
0 0
116
.073
144
.090
WBL
0 0
8 29
WBT
2 3200
27 .013*
72 .049*
WBR
0 0
5 55
TOTAL CAPACITY UTILIZATION .131 .226
Stantec A-41
NORTH NEWPORT CENTER SAN JOAQUIN PLAZA TPO TRAFFIC ANALYSIS
APPENDIX B
1 % Analysis Worksheets
City of Newport Beach
CAL v:\2073\active\2073006780\san_joaquin_plaza_tpo\report\rpt_sanjoaquinplaza_tpo_051612.docx St me
1 % Traffic Volume Analysis
Intersection: 1. Jamboree Rd & Ford Rd/Eastbluff Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1708 68 116 0 1892
19 10
Southbound
1946 78 183 0 2207
22 2
Eastbound
856 0 9 0 865
9 0
Westbound
685 0 12 0 697
7 1
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
2459 98 209 0 2766
28 5
Southbound
1676 67 148 0 1891
19 7
Eastbound
609 0 5 0 614
6 0
Westbound
380 0 6 0 386
4 2
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR:
2016
Stantec B-2
1 % Traffic Volume Analysis
Intersection: 2. Jamboree Rd & San Joaquin Hills Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1276 51 79 0 1406
14 8
Southbound
2272 91 186 0 2549
25 2
Eastbound
395 0 0 0 395
4 0
Westbound
148 0 51 0 199
2 3
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
1475 59 110 0 1644
16 6
Southbound
2008 80 162 0 2250
23 9
Eastbound
138 0 5 0 143
1 0
Westbound
796 0 116 0 912
9 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR:
2016
Stantec B-3
1 % Traffic Volume Analysis
Intersection: 3. Jamboree Rd & Santa Barbara Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1414 57 57 0 1528
15 2
Southbound
1639 66 114 0 1819
18 0
Eastbound
54 0 6 0 60
1 0
Westbound
144 0 37 0 181
2 14
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
1321 53 107 0 1481
15 6
Southbound
1528 61 98 0 1687
17 1
Eastbound
78 0 3 0 81
1 0
Westbound
706 0 20 0 726
7 7
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR:
2016
Stantec B-4
1 % Traffic Volume Analysis
Intersection: 4. Jamboree Rd & Coast Hwy
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
445 18 2 0 465
5 0
Southbound
1077 43 123 0 1243
12 7
Eastbound
2364 95 137 0 2596
26 1
Westbound
1099 44 51 0 1194
12 1
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
410 16 6 0 432
4 0
Southbound
1452 58 89 0 1599
16 3
Eastbound
2372 95 156 0 2623
26 4
Westbound
2066 83 135 0 2284
23 2
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR:
2016
Stantec B-5
1 % Traffic Volume Analysis
Intersection: 5. Newport Center Dr & Coast Hwy
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
0 0 0 0 0
0 0
Southbound
88 0 25 0 113
1 2
Eastbound
2033 81 74 0 2188
22 2
Westbound
1221 49 22 0 1292
13 2
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
0 0 0 0 0
0 0
Southbound
799 0 50 0 849
8 1
Eastbound
1582 63 59 0 1704
17 1
Westbound
1544 62 84 0 1690
17 3
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR:
2016
Stantec B-6
1 % Traffic Volume Analysis
Intersection: 6. Avocado Ave & Coast Hwy
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
361 0 0 0 361
4 0
Southbound
176 0 15 0 191
2 0
Eastbound
1260 50 64 0 1374
14 4
Westbound
1359 54 42 0 1455
15 2
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
295 0 0 0 295
3 0
Southbound
501 0 102 0 603
6 0
Eastbound
1359 54 43 0 1456
15 2
Westbound
1464 59 25 0 1548
15 3
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR:
2016
Stantec B-7
1 % Traffic Volume Analysis
Intersection: 7. MacArthur Blvd & Ford Rd/Bonita Cyn Dr Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
2000 80 53 0 2133
21 4
Southbound
2892 116 148 0 3156
32 1
Eastbound
410 0 5 0 415
4 2
Westbound
2066 0 14 0 2080
21 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
2487 99 187 0 2773
28 2
Southbound
3522 141 81 0 3744
37 5
Eastbound
419 0 6 0 425
4 2
Westbound
1149 0 16 0 1165
12 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR:
2016
Stantec B-8
1 % Traffic Volume Analysis
Intersection: 8. MacArthur Blvd & San Joaquin Hills Rd
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1423 57 13 0 1493
15 0
Southbound
2963 119 121 0 3203
32 1
Eastbound
469 0 40 0 509
5 5
Westbound
1062 0 9 0 1071
11 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
1488 60 65 0 1613
16 0
Southbound
2632 105 74 0 2811
28 4
Eastbound
1077 0 95 0 1172
12 3
Westbound
722 0 6 0 728
7 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR:
2016
Stantec B-9
1 % Traffic Volume Analysis
Intersection: 9. MacArthur Blvd & San Miguel Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1490 60 4 0 1554
16 0
Southbound
1420 57 59 0 1536
15 0
Eastbound
309 0 21 0 330
3 1
Westbound
457 0 13 0 470
5 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
1074 43 8 0 1125
11 1
Southbound
1422 57 34 0 1513
15 0
Eastbound
1125 0 100 0 1225
12 0
Westbound
433 0 22 0 455
5 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-10
1 % Traffic Volume Analysis
Intersection: 10. MacArthur Blvd & Coast Hwy
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
0 0 0 0 0
0 0
Southbound
1040 42 10 0 1092
11 1
Eastbound
1575 63 15 0 1653
17 4
Westbound
1972 79 41 0 2092
21 2
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
0 0 0 0 0
0 0
Southbound
1304 52 3 0 1359
14 0
Eastbound
1575 63 42 0 1680
17 2
Westbound
1925 77 26 0 2028
20 4
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-11
1 % Traffic Volume Analysis
Intersection: 11. Santa Cruz Dr & San Joaquin Hills Rd
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
87 0 31 0 118
1 4
Southbound
81 0 1 0 82
1 0
Eastbound
853 0 79 0 932
9 5
Westbound
387 0 12 0 399
4 1
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
769 0 12 0 781
8 2
Southbound
38 0 1 0 39
0 0
Eastbound
736 0 47 0 783
8 7
Westbound
509 0 75 0 584
6 5
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-12
1 % Traffic Volume Analysis
Intersection: 12. Santa Cruz Dr & San Clemente Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
113 0 31 0 144
1 0
Southbound
353 0 7 0 360
4 3
Eastbound
95 0 0 0 95
1 5
Westbound
35 0 0 0 35
0 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
565 0 12 0 577
6 2
Southbound
295 0 20 0 315
3 6
Eastbound
336 0 0 0 336
3 3
Westbound
102 0 0 0 102
1 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-13
1 % Traffic Volume Analysis
Intersection: 13. Santa Cruz Dr & Newport Center Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
44 0 16 0 60
1 0
Southbound
262 0 7 0 269
3 3
Eastbound
132 0 8 0 140
1 0
Westbound
171 0 7 0 178
2 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
248 0 6 0 254
3 1
Southbound
235 0 20 0 255
3 0
Eastbound
277 0 3 0 280
3 0
Westbound
314 0 3 0 317
3 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-14
1 % Traffic Volume Analysis
Intersection: 14. Santa Rosa Dr & San Joaquin Hills Rd
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
123 0 46 0 169
2 0
Southbound
132 0 0 0 132
1 0
Eastbound
499 0 84 0 583
6 5
Westbound
1005 0 10 0 1015
10 1
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
689 0 108 0 797
8 0
Southbound
143 0 0 0 143
1 0
Eastbound
750 0 39 0 789
8 3
Westbound
733 0 34 0 767
8 5
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-15
1 % Traffic Volume Analysis
Intersection: 15. Newport Center Dr & Santa Rosa Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
193 0 11 0 204
2 0
Southbound
95 0 12 0 107
1 1
Eastbound
61 0 23 0 84
1 0
Westbound
318 0 82 0 400
4 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
482 0 27 0 509
5 1
Southbound
293 0 27 0 320
3 0
Eastbound
216 0 54 0 270
3 0
Westbound
452 0 56 0 508
5 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-16
1 % Traffic Volume Analysis
Intersection: 16. Newport Center Dr & San Miguel Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
245 0 10 0 255
3 0
Southbound
96 0 10 0 106
1 1
Eastbound
19 0 20 0 39
0 0
Westbound
284 0 4 0 288
3 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
414 0 9 0 423
4 0
Southbound
290 0 8 0 298
3 0
Eastbound
329 0 18 0 347
3 0
Westbound
561 0 48 0 609
6 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-17
1 % Traffic Volume Analysis
Intersection: 17. Avocado Ave & San Miguel Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
325 0 56 0 381
4 0
Southbound
108 0 12 0 120
1 0
Eastbound
178 0 40 0 218
2 1
Westbound
1145 0 67 0 1212
12 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
610 0 110 0 720
7 0
Southbound
266 0 55 0 321
3 0
Eastbound
699 0 35 0 734
7 0
Westbound
837 0 56 0 893
9 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-18
1 % Traffic Volume Analysis
Intersection: 18. Newport Center Dr & Newport Center Dr Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
444 0 17 0 461
5 1
Southbound
11 0 13 0 24
0 0
Eastbound
122 0 6 0 128
1 2
Westbound
185 0 6 0 191
2 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
397 0 31 0 428
4 1
Southbound
167 0 25 0 192
2 0
Eastbound
348 0 13 0 361
4 1
Westbound
460 0 12 0 472
5 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-19
1 % Traffic Volume Analysis
Intersection: 19. Santa Barbara Dr & San Clemente Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
63 0 37 0 100
1 1
Southbound
716 0 8 0 724
7 0
Eastbound
0 0 0 0 0
0 0
Westbound
65 0 0 0 65
1 6
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
384 0 20 0 404
4 1
Southbound
251 0 27 0 278
3 2
Eastbound
0 0 0 0 0
0 0
Westbound
406 0 0 0 406
4 4
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-20
1 % Traffic Volume Analysis
Intersection: 20. Newport Center Dr & Santa Barbara Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
247 0 9 0 256
3 1
Southbound
137 0 9 0 146
1 1
Eastbound
196 0 8 0 204
2 1
Westbound
21 0 19 0 40
0 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
276 0 5 0 281
3 1
Southbound
329 0 5 0 334
3 0
Eastbound
253 0 27 0 280
3 1
Westbound
138 0 10 0 148
1 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-21
1 % Traffic Volume Analysis
Intersection: 1. Jamboree Rd & Ford Rd/Eastbluff Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1708 68 116 170 2062
21 10
Southbound
1946 78 183 39 2246
22 2
Eastbound
856 0 9 9 874
9 0
Westbound
685 0 12 21 718
7 1
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
2459 98 209 86 2852
29 5
Southbound
1676 67 148 163 2054
21 7
Eastbound
609 0 5 30 644
6 0
Westbound
380 0 6 14 400
4 2
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-22
1 % Traffic Volume Analysis
Intersection: 2. Jamboree Rd & San Joaquin Hills Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1276 51 79 136 1542
15 8
Southbound
2272 91 186 75 2624
26 2
Eastbound
395 0 0 0 395
4 0
Westbound
148 0 51 0 199
2 3
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
1475 59 110 102 1746
17 6
Southbound
2008 80 162 140 2390
24 9
Eastbound
138 0 5 0 143
1 0
Westbound
796 0 116 16 928
9 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-23
1 % Traffic Volume Analysis
Intersection: 3. Jamboree Rd & Santa Barbara Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1414 57 57 136 1664
17 2
Southbound
1639 66 114 58 1877
19 0
Eastbound
54 0 6 0 60
1 0
Westbound
144 0 37 0 181
2 14
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
1321 53 107 102 1583
16 6
Southbound
1528 61 98 140 1827
18 1
Eastbound
78 0 3 0 81
1 0
Westbound
706 0 20 0 726
7 7
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-24
1 % Traffic Volume Analysis
Intersection: 4. Jamboree Rd & Coast Hwy
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
445 18 2 0 465
5 0
Southbound
1077 43 123 58 1301
13 7
Eastbound
2364 95 137 87 2683
27 1
Westbound
1099 44 51 333 1527
15 1
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
410 16 6 0 432
4 0
Southbound
1452 58 89 140 1739
17 3
Eastbound
2372 95 156 243 2866
29 4
Westbound
2066 83 135 231 2515
25 2
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-25
1 % Traffic Volume Analysis
Intersection: 5. Newport Center Dr & Coast Hwy
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
0 0 0 0 0
0 0
Southbound
88 0 25 5 118
1 2
Eastbound
2033 81 74 118 2306
23 2
Westbound
1221 49 22 328 1620
16 2
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
0 0 0 0 0
0 0
Southbound
799 0 50 17 866
9 1
Eastbound
1582 63 59 347 2051
21 1
Westbound
1544 62 84 214 1904
19 3
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-26
1 % Traffic Volume Analysis
Intersection: 6. Avocado Ave & Coast Hwy
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
361 0 0 0 361
4 0
Southbound
176 0 15 0 191
2 0
Eastbound
1260 50 64 105 1479
15 4
Westbound
1359 54 42 328 1783
18 2
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
295 0 0 0 295
3 0
Southbound
501 0 102 0 603
6 0
Eastbound
1359 54 43 336 1792
18 2
Westbound
1464 59 25 214 1762
18 3
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-27
1 % Traffic Volume Analysis
Intersection: 7. MacArthur Blvd & Ford Rd/Bonita Cyn Dr Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
2000 80 53 112 2245
22 4
Southbound
2892 116 148 25 3181
32 1
Eastbound
410 0 5 7 422
4 2
Westbound
2066 0 14 21 2101
21 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
2487 99 187 52 2825
28 2
Southbound
3522 141 81 115 3859
39 5
Eastbound
419 0 6 21 446
4 2
Westbound
1149 0 16 14 1179
12 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-28
1 % Traffic Volume Analysis
Intersection: 8. MacArthur Blvd & San Joaquin Hills Rd
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1423 57 13 78 1571
16 0
Southbound
2963 119 121 59 3262
33 1
Eastbound
469 0 40 3 512
5 5
Westbound
1062 0 9 9 1080
11 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
1488 60 65 68 1681
17 0
Southbound
2632 105 74 83 2894
29 4
Eastbound
1077 0 95 25 1197
12 3
Westbound
722 0 6 6 734
7 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-29
1 % Traffic Volume Analysis
Intersection: 9. MacArthur Blvd & San Miguel Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
1490 60 4 115 1669
17 0
Southbound
1420 57 59 42 1578
16 0
Eastbound
309 0 21 12 342
3 1
Westbound
457 0 13 0 470
5 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
1074 43 8 90 1215
12 1
Southbound
1422 57 34 83 1596
16 0
Eastbound
1125 0 100 37 1262
13 0
Westbound
433 0 22 0 455
5 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-30
1 % Traffic Volume Analysis
Intersection: 10. MacArthur Blvd & Coast Hwy
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
0 0 0 0 0
0 0
Southbound
1040 42 10 54 1146
11 1
Eastbound
1575 63 15 105 1758
18 4
Westbound
1972 79 41 432 2524
25 2
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
0 0 0 0 0
0 0
Southbound
1304 52 3 120 1479
15 0
Eastbound
1575 63 42 336 2016
20 2
Westbound
1925 77 26 284 2312
23 4
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-31
1 % Traffic Volume Analysis
Intersection: 11. Santa Cruz Dr & San Joaquin Hills Rd
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
87 0 31 0 118
1 4
Southbound
81 0 1 0 82
1 0
Eastbound
853 0 79 17 949
9 5
Westbound
387 0 12 0 399
4 1
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
769 0 12 16 797
8 2
Southbound
38 0 1 0 39
0 0
Eastbound
736 0 47 0 783
8 7
Westbound
509 0 75 0 584
6 5
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-32
1 % Traffic Volume Analysis
Intersection: 12. Santa Cruz Dr & San Clemente Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
113 0 31 0 144
1 0
Southbound
353 0 7 17 377
4 3
Eastbound
95 0 0 0 95
1 5
Westbound
35 0 0 0 35
0 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
565 0 12 16 593
6 2
Southbound
295 0 20 0 315
3 6
Eastbound
336 0 0 0 336
3 3
Westbound
102 0 0 0 102
1 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-33
1 % Traffic Volume Analysis
Intersection: 13. Santa Cruz Dr & Newport Center Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
44 0 16 0 60
1 0
Southbound
262 0 7 17 286
3 3
Eastbound
132 0 8 3 143
1 0
Westbound
171 0 7 1 179
2 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
248 0 6 8 262
3 1
Southbound
235 0 20 0 255
3 0
Eastbound
277 0 3 10 290
3 0
Westbound
314 0 3 4 321
3 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-34
1 % Traffic Volume Analysis
Intersection: 14. Santa Rosa Dr & San Joaquin Hills Rd
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
123 0 46 3 172
2 0
Southbound
132 0 0 0 132
1 0
Eastbound
499 0 84 0 583
6 5
Westbound
1005 0 10 26 1041
10 1
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
689 0 108 25 822
8 0
Southbound
143 0 0 0 143
1 0
Eastbound
750 0 39 0 789
8 3
Westbound
733 0 34 6 773
8 5
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-35
1 % Traffic Volume Analysis
Intersection: 15. Newport Center Dr & Santa Rosa Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
193 0 11 6 210
2 0
Southbound
95 0 12 10 117
1 1
Eastbound
61 0 23 0 84
1 0
Westbound
318 0 82 17 417
4 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
482 0 27 20 529
5 1
Southbound
293 0 27 10 330
3 0
Eastbound
216 0 54 8 278
3 0
Westbound
452 0 56 0 508
5 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-36
1 % Traffic Volume Analysis
Intersection: 16. Newport Center Dr & San Miguel Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
245 0 10 3 258
3 0
Southbound
96 0 10 9 115
1 1
Eastbound
19 0 20 12 51
1 0
Westbound
284 0 4 37 325
3 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
414 0 9 3 426
4 0
Southbound
290 0 8 4 302
3 0
Eastbound
329 0 18 45 392
4 0
Westbound
561 0 48 22 631
6 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-37
1 % Traffic Volume Analysis
Intersection: 17. Avocado Ave & San Miguel Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
325 0 56 0 381
4 0
Southbound
108 0 12 0 120
1 0
Eastbound
178 0 40 12 230
2 1
Westbound
1145 0 67 37 1249
12 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
610 0 110 0 720
7 0
Southbound
266 0 55 0 321
3 0
Eastbound
699 0 35 37 771
8 0
Westbound
837 0 56 22 915
9 1
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-38
1 % Traffic Volume Analysis
Intersection: 18. Newport Center Dr & Newport Center Dr Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
444 0 17 13 474
5 1
Southbound
11 0 13 3 27
0 0
Eastbound
122 0 6 1 129
1 2
Westbound
185 0 6 1 192
2 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
397 0 31 11 439
4 1
Southbound
167 0 25 9 201
2 0
Eastbound
348 0 13 4 365
4 1
Westbound
460 0 12 4 476
5 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-39
1 % Traffic Volume Analysis
Intersection: 19. Santa Barbara Dr & San Clemente Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
63 0 37 0 100
1 1
Southbound
716 0 8 0 724
7 0
Eastbound
0 0 0 0 0
0 0
Westbound
65 0 0 0 65
1 6
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
384 0 20 0 404
4 1
Southbound
251 0 27 0 278
3 2
Eastbound
0 0 0 0 0
0 0
Westbound
406 0 0 0 406
4 4
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-40
1 % Traffic Volume Analysis
Intersection: 20. Newport Center Dr & Santa Barbara Dr
Existing Traffic Volumes Based on Average Winter/Spring 2012 Peak 1 Hour Approved Cumulative
Existing Regional Projects Projects Projected
1 % of Projected
Project
Approach
Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour
Peak 1 Hour
Peak 1 Hour
Direction
Volume Volume Volume Volume Volume
Volume
Volume
AM PEAK PERIOD
Northbound
247 0 9 3 259
3 1
Southbound
137 0 9 9 155
2 1
Eastbound
196 0 8 0 204
2 1
Westbound
21 0 19 0 40
0 0
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume.
Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
276 0 5 2 283
3 1
Southbound
329 0 5 4 338
3 0
Eastbound
253 0 27 0 280
3 1
Westbound
138 0 10 8 156
2 0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume.
Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
San Joaquin Plaza
FULL OCCUPANCY YEAR: 2016
Stantec B-41
No
01-1 Initial Study and General Plan Program EIR Addendum No. 2 Technical Appendix E
Water Supply Assessment
T&B Planning, Inc.
June 13, 2012
NNCPC Development Plan Amendment and Related Actions June 2012 Lead Agency: City of Newport Beach
WATER SUPPLY ASSESSMENT
North Newport Center Planned
Community
Development Plan Amendment and
Related Actions
City of Newport Beach
3300 Newport Boulevard
Newport Beach, California 92658-8915
June 13, 2012
Prepared by:
T&B Planning, Inc.
Submitted By:
Georgl4e,murd6ch
General Manager, Municipal Operations Department
City of Newport Beach WATER SUPPLY ASSESSMENT
Table of Contents
Section
Preface.......................................................................................................................................................................... 2 ProjectDescription.................................................................................................................................................... 2 Purpose of this Water Supply Assessment....................................................................................................... 3 CEQACompliance Background............................................................................................................................ 8 Findings.......................................................................................................................................................................... 8 Summary of Existing and Projected Demand.................................................................................................. 10 WaterSupply Sources.............................................................................................................................................. 10 Imported Water from Metropolitan via the MWDOC................................................................... 12 Groundwater from the Lower Santa Ana River Groundwater Basin ........................................ 16 RecycledWater............................................................................................................................................ 17 Reliabilityand Supply............................................................................................................................................... 18 Water Conservation Programs and Requirements........................................................................................ 19 Analysisand Conclusions....................................................................................................................................... 21 Figures
Figure1, Location Map............................................................................................................................................ 6 Figure 2, Aerial Photograph of Existing Urban Setting................................................................................ 7 Tables
Table 1, City of Newport Beach Water Demand Projections..................................................................... 10 Table 2, City of Newport Beach Water Demand by Source....................................................................... 11 Table 3, City of Newport Beach Water Demand Percentage by Source ............................................... 11 Table 4, Metropolitan's Water Supply Capacity............................................................................................. 13 Table 5, Historic Groundwater Supplies 2005-2009..................................................................................... 15 Table 6, City of Newport Beach Projected Normal Year Water Supply and Demand ...................... 18 Table 7, City of Newport Beach Projected Single Dry Year Water Supply and Demand ................ 19 Table 8, City of Newport Beach Projected Multiple Dry Years Water Supply and Demand.......... 19 Table 9, Water Demand for 79 Multi -Family Residential Units................................................................ 22 Table 10, Water Demand for 15 Multi -Family Residential Units.............................................................. 22 Table 11, Water Demand for430 Multi -Family Residential Units............................................................. 22 Table 12, Total Residential Water Demand in San Joaquin Plaza............................................................ 22 Table 13, Anticipated Water Demand Eliminated from Hotel Rooms ................................................... 23 Appendices
City of Newport Beach Water Conservation Ordinance
City of Newport Beach 2010 Urban Water Management Plan
NNCPC Development Plan Amendment and Related Actions June 13, 2012
City of Newport Beach WATER SUPPLY ASSESSMENT
Preface
California Senate Bill 610 (Costa) and Senate Bill 221 (Kuehl) amended California State law effective January 1, 2002, to improve the link between information on water supply availability and certain land use decisions made by cities and counties. SB 610 and SB 221 are companion measures that promote more collaborative planning between local water suppliers and cities and counties. Both statutes require detailed information regarding water availability to be provided to the city and county decision -makers prior to approval of specified large development projects. Both statutes also require that this detailed information be included in the administrative record that serves as the evidentiary basis for an approval action by the city or county on such projects.
The City of Newport Beach provides water service to the Project site evaluated in this Water Supply Assessment. Therefore, the Newport Beach City Council serves as the lead agency with authority to approve this Water Supply Assessment as well as the lead agency that will consider approval of the proposed Project described below.'
Project Description
The proposed Project evaluated in this Water Supply Assessment is located in the City of Newport Beach, Orange County, California. Specifically, the subject property is located in the Newport Center Statistical Area (Statistical Area 1-1), commonly known as Newport Center/Fashion Island, which is a mixed use district that includes major retail, professional office, entertainment, recreation, and residential uses in a master -planned development.
The Newport Beach General Plan Land Use Element describes the City's existing and planned development pattern. It includes maps and tables that specify where certain land uses can occur and assigns maximum development limits (also called development "intensity") to specific locations. Specific areas of the City are identified on the General Plan Land Use Map as "Anomaly Locations," where a maximum development intensity is allowed pursuant to General Plan Tables LU1 and LU2. The General Plan recognizes that although Newport Beach is mostly built -out, growth and change will continue to occur; therefore, to allow flexibility, the City Council may allow transfers of un-built development intensity.
In February 2012, Irvine Company (hereafter "Project Applicant") submitted an application to the City's Planning Division requesting that the development intensity allowed by the General Plan for 79 un-built hotel rooms in Statistical Area L1, Anomaly Location 43, be converted from "hotel rooms" to "multi -family residential units" and transferred to the San Joaquin Plaza portion of the North Newport Center Planned Community (NNCPC). The Project Applicant also requests that 15 un-built multi -family residential units allowed by the General Plan in MU-H3 designated portions of Statistical Area L1 be specifically assigned to the NNCPC in San Joaquin Plaza. If the requested development intensity conversion, transfer, and assignment are approved by the City, a total of 94 additional residential units would be allowed in San Joaquin Plaza.
NNCPC Development Plan Amendment and Related Actions June 13, 2012
City of Newport Beach WATER SUPPLY ASSESSMENT
Under existing conditions, there is no residential development in San Joaquin Plaza, but 430 multi -family residential units are allowed there pursuant to the City's General Plan and the NNCPC Development Plan. With the addition of 94 units, the maximum number of multi -family residential units allowed in San Joaquin Plaza would increase from 430 to 524 units. No specific subdivision map or development project is proposed at this time. The proposed Project is limited to the requested development intensity conversion, transfer, and assignment and, in total, the vesting of 94 units of residential development intensity to San Joaquin Plaza (79 converted and transferred units and 15 units previously unassigned) and the reallocation of 430 multi -family residential units already allowed within the NNCPC's Block 500, Block 600, and the San Joaquin Plaza solely to the San Joaquin Plaza. In order for the Project Applicant's application to be approved, the City of Newport Beach would need to approve the following:
1) Convert un-built non-residential development intensity (79 hotel rooms) to multi -family residential development intensity (79 multi -family units) and transfer the converted development intensity into the NNCPC;
2) Assign 15 residential units currently allowed by the General Plan within the MU-H3 portions of the Newport Center to San Joaquin Plaza;
3) Amend the NNCPC Development Plan to increase the allowable residential development intensity by a total of 94 units and to allocate the 94 units plus the 430 residential units currently allocated to the MU-H3 portions of the NNCPC solely to San Joaquin Plaza; 4) Amend the Zoning Implementation and Public Benefit Agreement between the City of Newport Beach and the Irvine Company concerning North Newport Center to vest the revised development intensities and allocations;
5) Approve a traffic study for 94 units pursuant to the City's Traffic Phasing Ordinance; and 6) Amend the Affordable Housing Implementation Plan (AHIP).
An exhibit showing the location of San Joaquin Plaza (outlined in red) in relation to the NNCPC (highlighted in yellow) is shown on Figure 1.
Puroose of this Water Suooly Assessment
The purpose of this Water Supply Assessment (Assessment) is to satisfy the requirements under Senate Bill 610 (Costa) (California Public Resources Code Section 21151.9 and Water Code Section 10910 et seq.) and Senate Bill 221 (Kuehl) (California Government Code Section 66473.7), which require that an assessment be conducted to demonstrate that adequate water supplies are or will be available to meet the water demand associated with proposed projects.
SB 610 focuses on the content of a water supply agency's Urban Water Management Plan (UWMP). It also stipulates that, when an environmental impact report (EIR) is required in connection with a project, the appropriate water supply agency must provide an assessment of whether its total projected water supplies will meet projected water demand associated with the proposed project.
NNCPC Development Plan Amendment and Related Actions June 13, 2012
City of Newport Beach WATER SUPPLY ASSESSMENT
Senate Bill 221 requires a water supply verification when a tentative map, parcel map, or development agreement for a project is submitted to a land use agency for approval. Senate Bill 221 applies to proposed residential developments of more than 500 dwelling units with some exceptions. Section 66473.7(i) exempts residential projects proposed on a site located within an urbanized area that has been previously developed for urban uses, or where the immediate contiguous properties surrounding the residential project site are, or previously have been, developed for urban uses. The San Joaquin Plaza is currently developed with multi -tenant commercial office land uses, surface parking lots, a parking structure, and ornamental landscaping. As shown on Figure 2, abutting the site on the Northwest is the Newport Beach Police Department, the Newport Beach Fire Department Station 3, and an automotive dealership. To the South is a commercial office building and the Orange County Museum of Art, beyond which and further to the South is the Fashion Island shopping mall. To the Southwest is a commercial office building and a rental apartment complex. To the Northeast, across San Joaquin Hills Road, is a single-family residential neighborhood. To the Southeast, across Santa Cruz Drive are multi -tenant office/commercial land uses, a hotel with 295 rooms presently operated as the Island Hotel, and several parking structures. As such, the City of Newport Beach is not required to issue a written water supply verification pursuant to Senate Bill 221 because the proposed Project site is in an urbanized area, is currently developed with urbanized uses, and is surrounded by urbanized uses. The City can still opt to issue a written verification, but the verification is not required because the Project site is currently developed with urban uses, is surrounded by developed urban uses, and the proposed Project is clearly an infill project.
Senate Bill 610 applies to a proposed residential development of more than 500 dwelling units, or large commercial, industrial or mixed -use development. The need for a water supply assessment is determined by the lead agency for the project. For the proposed Project evaluated in this Water Supply Assessment, the City of Newport Beach serves as the lead agency, which required that this Water Supply Assessment be prepared.
In accordance with Water Code Section 10910(d) — (f), the Water Supply Assessment shall:
1) Identify any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed Project, and a description of the quantities of water received in prior years by the public water system, under existing water supply entitlements, water rights, or water service contracts; 2) If no water has been received in prior years by the public water system, identify the other public water systems or water service contract holders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts to the same source of water as the public water system.
3) If groundwater is included in the proposed supply, identify the groundwater basin or basins from which the Proposed Project will be supplied; any applicable documentation of adjudicated rights to pump; if the basin is not adjudicated, whether the basin has been identified as over -drafted; a detailed description and analysis of the amount and NNCPC Development Plan Amendment and Related Actions June 13, 2012
City of Newport Beach WATER SUPPLY ASSESSMENT
location of groundwater pumped by the public water system for the past five (5) years from any groundwater basin from which the proposed Project will be supplied; a detailed description and analysis of the amount and location of groundwater from the basin or basins from which the proposed Project will be supped to meet the projected water demand associated with the Proposed Project.
Under existing conditions, the San Joaquin Plaza portion of the NNCPC contains no residential units. However, the City's General Plan and NNCPC Development Plan currently allow for 430 multi -family residential units. Should the development intensity transfers requested by the Project Applicant be approved by the City of Newport Beach, 94 additional residential units would be permitted in San Joaquin Plaza, bringing the maximum number of permitted multi- family residential dwelling units allowed in this area to 524 units. Although no specific development project to build these units is proposed at this time, because: 1) the number of permitted residential units in San Joaquin Plaza would exceed 500, 2) approval of the Project is subject to the California Environmental Quality Act (CEQA), and 3) San Joaquin Plaza is located in the NNCPC, which is the subject of a development agreement titled "Zoning Implementation and Public Benefit Agreement between the City of Newport Beach and the Irvine Company Concerning North Newport Center," the City of Newport Beach, serving as lead agency, is required to conduct a Water Supply Assessment in compliance with Senate Bill 610 (Costa) (California Public Resources Code Section 21151.9).
In addition to meeting the requirements of Senate Bill 610, this Water Supply Assessment also will be used by the City of Newport Beach as part of the proposed Project's environmental review process under CEQA. This Assessment evaluates water supplies that are or will be available during normal year, dry year, and multiple dry -year conditions over a 20-year projection period, considering existing demands, expected demands from the proposed Project, and reasonably foreseeable future demands in geographic areas that are supplied water by the City of Newport Beach.
This Assessment is a technical, informational, advisory opinion only. The information included is based on information available at the time this Assessment was prepared and changing circumstances could affect the water supply evaluation presented in this document. This Water Supply Assessment does not explicitly entitle the San Joaquin Plaza to receive additional water rights, water service, or any water rights or service priorities and allocations. It also does not affect the City's obligation to provide services to its existing water customers and future customers. City Council approval of this Water Supply Assessment is not an entitlement to water rights or service to San Joaquin Plaza, nor is it a commitment to serve the area with increased water service capacities and/or supplies. Because the proposed Project that is the subject of this Water Supply Assessment is limited to a request to vest permitted development intensity to San Joaquin Plaza and because no specific development project is proposed at this time, this Assessment is a general evaluation of water supply and is not an engineered analysis related to any particular or specific residential development project.
NNCPC Development Plan Amendment and Related Actions June 13, 2012
City of Newport Beach WATER SUPPLY ASSESSMENT
Figure 1, Location Map
NNCPC Development Plan Amendment and Related Actions June 13, 2012
r
or
"Resi ierptial
�-
Y
01 Z R4 Tm 1 0
At
6° � " StC�fivrl 4 RoeFanro,!
'�R- si`d tial ,,�
,
rr - NKI
f,.. i.:,• � ,� � _ \, Mom; ;�,["
Co�rie�ci:al,
p
1 �menfe i r
�--in
Newpert
Beach
Golf Course I o ~°
_ Center Dr_
City of Newport Beach WATER SUPPLY ASSESSMENT
CEQA Compliance Background
In 2006, the City of Newport Beach approved an update to its General Plan and certified the General Plan 2006 Update Final Program EIR (SCH No. 2006011119) as adequately addressing the potential environmental impacts associated with planned buildout of the City of Newport Beach, inclusive of the property encompassing the NNCPC and San Joaquin Plaza. Section 4.14 of the General Plan 2006 Update Final Program EIR addressed "Utilities and Service Systems," including the topic of water supply. The Final Program EIR concluded, based on substantial evidence cited in the EIR and the City's Administrative Record for the EIR, that with the implementation of mandatory regulatory requirements applicable General Plan goals and policies, impacts associated with water supplies would be less than significant. Similarly, Addendum No. 1 to the General Plan 2006 Update Final Program EIR, which addressed City adoption of the NNCPC Development Plan and related actions, concluded that water supply impacts would be less than significant with adherence to regulatory requirements and the General Plan.
The General Plan 2006 Update Final Program EIR relied on the City of Newport Beach's 2005 Urban Water Management Plan (UWMP). UWMPs are required by Senate Bill 610 and serve as important source documents for cities and counties as they update their General Plans.
Conversely, General Plans are used as source documents as water suppliers update their UWMPs. The City of Newport Beach General Plan and UWMP are linked and their accuracy and usefulness are interdependent. As discussed later in this document, the City of Newport Beach published an updated UWMP in 2010, which is currently pending final approval by the California Department of Water Resources. Because the proposed Project involves a request to transfer development intensity permitted by the City's General Plan from one location to another location, the City's General Plan and 2010 UWMP are used as a primary reference documents in this Water Supply Assessment.
Findings
The Project involves the proposed conversion of permitted development intensity for 79 un- built hotel rooms to 79 multi -family residential units and the transfer of those 79 units and the assignment of an additional 15 un-built units of residential development intensity permitted by the General Plan to the San Joaquin Plaza area of the NNCPC. If the Project is approved, the Project Applicant would have entitlement to construct up to 524 multi -family residential units in San Joaquin Plaza (the 79 transferred units, 15 assigned units, plus 430 units already allocated to the NNCPC). Future residential development in San Joaquin Plaza, if and when it is proposed, would be subject to the development standards, design guidelines, and administration procedures required by the NNCPC Development Plan, which serves as the controlling zoning ordinance for activities within its boundaries, including San Joaquin Plaza.
NNCPC Development Plan Amendment and Related Actions June 13, 2012