3.15.2 A
dditional Insured . The City of Ontario, its officials, officers, employees, agents, and volunteers shall be named as additional insureds on Consultant ’s and its subconsultants’ policies of commercial general liability and automobile liability insurance using the endorsements and forms specified herein or exact equivalents.
3.15.3 Co
mmercial General Liability
(a) The Consultant shall take out and maintain, during the performance of all work under this Agreement, in amounts not less than specified herein, Commercial General Liability Insurance, in a form and with insurance companies acceptable to the City. (b) Coverage for Commercial General Liability insurance shall be at least as broad as the following: Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) or exact equivalent. Commercial General Liability Insurance must include coverage for the following:
(i) Bodily Injury and Property Damage
(ii) Personal Injury/Advertising Injury
(iii) Premises/Operations Liability
(iv) Products/Completed Operations Liability
(v) Aggregate Limits that Apply per Project
410
46700.00100\40935196.1
BB&K (2024) -15-
(vi) Explosion, Collapse and Underground (UCX) exclusion deleted
(vii) Contractual Liability with respect to this Contract (viii) Broad Form Property Damage
(ix) Independent Consultants Coverage
(c) The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; (3) products/completed operations liability; or (4) contain any other exclusion contrary to the Agreement.
(d) The policy shall give City, the City Council and each member of the City Council, its officers, employees, agents and City designated volunteers additional insured status using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements providing the exact same coverage.
(e) The general liability program may utilize either deductibles or provide coverage excess of a self-insured retention, subject to written approval by the City, and provided that such deductibles shall not apply to the City as an additional insured.
3.15.4 Automobile Liability
(a) At all times during the performance of the work under this Agreement, the Consultant shall maintain Automobile Liability Insurance for bodily injury and property damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City.
(b) Coverage for automobile liability insurance shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).
(c) The policy shall give City, the City Council and each member of the City Council, its officers, employees, agents and City designated volunteers additional insured status.
(d) Subject to written approval by the City, the automobile liability program may utilize deductibles, provided that such deductibles shall not apply to the City as an additional insured, but not a self-insured retention.
3.15.5 Workers’ Compensation/Employer’s Liability
(a) Consultant certifies that he/she is aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self -insurance in accordance with the provisions of that code, and he/she will comply with such provisions before commencing work under this Agreement.
411
46700.00100\40935196.1
BB&K (2024) -16-
(b) To the extent Consultant has employees at any time during the term of this Agreement, at all times during the performance of the work under this Agreement, the Consultant shall maintain full compensation insurance for all persons employed directly by him/her to carry out the work contemplated under this Agreement, all in accordance with the “Workers’ Compensation and Insurance Act,” Division IV of the Labor Code of the State of California and any acts amendatory thereof, and Employer’s Liability Coverage in amounts indicated herein. Consultant shall require all subconsultants to obtain and maintain, for the period required by this Agreement, workers’ compensation coverage of the same type and limits as specified in this Section.
3.15.6 Professional Liability (Errors and Omissions)
(a) At all times during the performance of the work under this Agreement the Consultant shall maintain professional liability or Errors and Omissions insurance appropriate to its profession, in a form and with insurance companies acceptable to the City and in an amount indicated herein. This insurance shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Consultant. “Covered Professional Services” as designated in the policy must specifically include work performed under this Agreement. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer's duty to defend.
3.15.7 Minimum Policy Limits Required
(a) The following insurance limits are required for the Agreement:
Coverage Combined Single Limit
Commercial General Liability $2,000,000 per occurrence/ $4,000,000 aggregate for bodily injury, personal
injury, and property damage
Automobile Liability $2,000,000 per occurrence for bodily injury and property damage
Employer’s Liability $1,000,000 per occurrence
Professional Liability $2,000,000 per claim and aggregate (errors and omissions)
(b) Defense costs shall be payable in addition to the limits. (c) Requirements of specific coverage or limits contained in this Section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as Additional Insured pursuant to this Agreement.
3.15.8 Evidence Required
(a) Prior to execution of the Agreement, the Consultant shall file with the City evidence of insurance from an insurer or insurers certifying to the coverage of all insurance required herein. Such evidence shall include original copies of the ISO CG 00 01 (or insurer’s equivalent) signed by the insurer’s representative and Certificate of Insurance (Acord 412
46700.00100\40935196.1
BB&K (2024) -17-
Form 25-S or equivalent), together with required endorsements. All evidence of insurance shall be signed by a properly authorized officer, agent, or qualified representative of the insurer a nd shall certify the names of the insured, any additional insureds, where appropriate, the type and amount of the insurance, the location and operations to which the insurance applies, and the expiration date of such insurance.
3.15.9 Policy Provisions Required
(a) C onsultant shall provide the City at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Consultant shall provide at least ten (10) days prior written notice of cancellation of any such policy due to non-payment of premium. If any of the required coverage is cancelled or expires during the term of this Agreement, the Consultant shall deliver renewal certificate(s) including the General Liability Additional Insured Endorsement to the City at least ten (10) days prior to the effective date of cancellation or expiration.
(b) The Commercial General Liability Policy and Automobile Policy shall each contain a pro vision stating that Consultant’s policy is primary insurance and that any insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees, agents, or volunteers shall not contribute with this primary insurance. Policies shall contain or be endorsed to contain such provisions.
(c) The retroactive date (if any) of each policy is to be no later than the effective date of this Agreement. Consultant shall maintain such coverage continuously for a period of at least three years after the completion of the work under this Agreement. Consultant shall purchase a one (1) year extended reporting period A) if the retroactive date is advanced past the effective date of this Agreement; B) if the policy is cancelled or not renewed; or C) if the policy is replaced by another claims -made policy with a retroactive date subsequent to the effective date of this Agreement.
(d) All required insurance coverages, except for the professional liability coverage, shall contain or be endorsed to waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
(e) The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability.
Further the limits set forth herein shall not be construed to relieve the Consultant from liability in excess of such coverage, nor shall it limit the Consultant’s indemnification obligations to the City and shall not preclude the City from taking such other actions available to the City under other provisions of the Agreement or law.
3.15.10 Qualifying Insurers
(a) All policies required shall be issued by acceptable insurance companies, as determined by the City, which satisfy the following minimum requirements: Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A:VII and admitted to transact in the business of insurance in the State of California, or 413
46700.00100\40935196.1
BB&K (2024) -18-
otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.
3.15.11 Additional Insurance Provisions
(a) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Consultant, and any approval of said insurance by the City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Consultant pursuant to this Agreement, including but not limited to, the provisions concerning indemnification.
(b) If at any time during the life of the Agreement, any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement.
(c) The City may require the Consultant to provide complete copies of all insurance policies in effect for the duration of the Project. (d) Neither the City nor the City Council, nor any member of the City Council, nor any of the officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement.
3.15.12 Subconsultant Insurance Requirements
(a) Consultant shall not allow any subcontractors or subconsultants to commence work on any subcontract until they have provided evidence satisfactory to the City that they have secured all insurance required under this Section. Policies of commercial general liability insurance provided by such subcontractors or subconsultants shall be endorsed to name the City as an additional insured using ISO form CG 20 38 04 13 or an endorsement providing the exact same coverage. If requested by Consultant , City may approve different scopes or minimum limits of insurance for particular subcontractors or subconsultants.
3.16 Records.
Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identi fiable.
Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of five (5) years from the date of final payment under this Agreement.
3.17 Standardized Manufactured Items.
Consultant shall cooperate and consult with City in the use and selection of manufactured items on the Project, including but not limited to, paint, hardware, plumbing, mechanical and electrical equipment, fixtures, roofing materials and floor coverings. All such manufactured items 414
46700.00100\40935196.1
BB&K (2024) -19-
shall be standardized to City’s criteria to the extent such criteria do not interfere with building design.
3.18 Limitation of Agreement.
This Agreement is limited to and includes only the work included in the Project described herein. Any additional or subsequent construction at the site of the Project, or at any other City site, will be covered by, and be the subject of, a separate Agreement for architectural services between City and the Consultant chosen therefor by City.
3.19 Mediation.
Disputes arising from this Agreement may be submitted to mediation if mutually agreeable to the Parties hereto. The type and process of mediation to be utilized shall be subject to the mutual agreement of the Parties.
3.20 Successors and Assigns.
This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each Party to this Agreement. However, Consultant shall not assign or transfer by operation of law or otherwise any or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.
3.21 Asbestos Certification.
Consultant shall certify to City, in writing and under penalty of perjury, that to the best of its knowledge, information and belief no asbestos -containing material or other material deemed to be hazardous by the state or federal government was specified as a building material in any construction document that the Consultant prepares for the Project. Consultant shall require all consultants who prepare any other documents for the Project to submit the same written certification. Consultant shall also assist the City in ensuring that contractors provide City with certification, in writing and under penalty of perjury, that to the best of their knowledge, information and belief no material furnished, installed or incorporated into the Project contains asbestos or any other material deemed to be hazardous by the state or federal government. These certifications shall be part of the final Project submittal. Consultant shall include statements in its specifications that materials containing asbestos or any other material deemed to be hazardous by the state or federal government are not to be included.
3.22 No Third Party Rights.
This Agreement shall not create any rights in, or inure to the benefits of, any third party except as expressly provided herein.
3.23 Governing Law.
This Agreement shall be construed in accordance with, and governed by, the laws of the State of California. Venue shall be in San Bernardino County. 415
46700.00100\40935196.1
BB&K (2024) -20-
3.24 Exhibits and Recitals.
All exhibits and recitals contained herein and attached hereto are material parts of this Agreement and are incorporated as if fully set forth.
3.25 Severability.
Should any provision in the Agreement be held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall continue in full force and effect.
3.26 Non-Waiver.
None of the provisions of this Agreement shall be considered waived by either Party , unless such waiver is specifically specified in writing.
3.27 Safety.
Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of its employees, consultant and subcontractors appropriate to the nature of the work and the conditions under which the work is to be performed.
3.28 Harassment Policy.
Consultant shall provide a copy of the City's Harassment Policy to each of its employees assigned to perform the tasks under this Agreement. Consultant shall submit to the City's Personnel Manager a statement signed by each of its employees who are assigned to perf orm the Services under this Agreement certifying receipt of City's Harassment Policy and certifying that they have read the Harassment Policy. A finding by the City that any of Consultant 's employees has harassed a City employee shall be grounds for appropriate discipline, up to and including such employee's removal from performance of this Agreement at City's request.
3.29 Delivery of Notices.
All notices permitted or required under this Agreement shall be given to the respective Parties at the following address, or at such other address as the respective Parties may provide in writing for this purpose:
CITY:
City of Ontario
303 East “B” Street
Ontario, CA 91764
Attn: Ms. Marissa Kucheck, Museum Director
CONSULTANT:
Architectural Resources Group
Pier 9, The Embarcadero, Suite 107
San Francisco, CA 94111
Attn: Katie Horak
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the Party 416
46700.00100\40935196.1
BB&K (2024) -21-
at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
3.30 Time of Essence.
Time is of the essence for each and every provision of this Agreement.
3.31 City’s Right to Employ Other Consultants.
City reserves right to employ other consultants, including designers, in connection with this Project or other projects.
3.32 Prohibited Interests.
3.32.1 Solicitation. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability.
3.32.2 C
onflict of Interest. For the term of this Agreement, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
3.33 Equal Opportunity Employment.
Consultant represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or any other classification protected by federal or state law.
Such non- discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of City’s minority business enterprise program, affirmative action plan or other related programs or guidelines currently in effect or hereinafter enacted.
3.34 Labor Certification.
By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.
3.35 Subcontracting.
As specified in this Agreement, Consultant shall not subcontract any portion of the Services required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to each and every provision of this Agreement.
417
46700.00100\40935196.1
BB&K (2024) -22-
3.36 Supplemental Conditions.
Any supplemental conditions shall be attached as an exhibit to this Agreement, and that exhibit shall be incorporated herein by reference.
3.37 Entire Agreement.
This Agreement, with its exhibits, contains the entire agreement of the Parties hereto, and supersedes any and all other prior or contemporaneous negotiations, understandings and oral or written agreements between the Parties hereto. Each Party acknowledges that no representations, inducements, promises or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. Furthermore, any modification of this Agreement shall only be effective if in writing signed by all Parties hereto.
SIGNATURES ON FOLLOWING PAGE
418
46700.00100\40935196.1
BB&K (2024) -23-
SIGNATURE PAGE FOR DESIGN SERVICES AGREEMENT
BETWEEN THE CITY OF ONTARIO
AND ARCHIECTURAL RESOURCES GROUP
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.
CITY OF ONTARIO ARCHITECTURAL RESOURCES GROUP
By:
Its:
Printed Name:
By:
Its:
Printed Name:
[If Corporation, TWO SIGNATURES,
President OR Vice President AND Secretary
OR Treasurer REQUIRED]
Approved By:
Scott Ochoa
City Manager
Approved as to Form:
_____________________________________
Best Best & Krieger LLP
City Attorney
Attested By:
City Clerk
419
46700.00100\40935196.1
BB&K (2024) Exhibit A-1
EXHIBIT “A”
SCOPE OF SERVICES
1. GENERAL REQUIREMENTS.
1.1 Basic Services. Consultant agrees to perform all the necessary professional architectural, engineering (e.g. mechanical, electrical, plumbing, structural, site engineering, and any other necessary engineering services mutually agreeable to the Parties) and construction administration services for the Project in a timely and professional manner, consistent with the standards of the profession, including those provided for herein.
1.2 Exclusions from Basic Services. The following services shall be excluded from the basic services listed above: To be determined on a case -by-case basis for this On- Call, as needed Architectural services
1.3 Additional Services. Consultant shall perform the following Additional Services for the Project: N/A
1.4 Communication with City. Consultant shall participate in consultations and conferences with authorized representatives of City and/or other local, regional, or state agencies concerned with the Projec t, which may be necessary for the completion of the Project or the development of the drawings, specifications and documents in accordance with the applicable standards and requirements of law and the City. Such consultations and conferences shall continue throughout the planning and construction of the Project and the contractor’s warranty period. Consultant shall take direction only from the City’s Representative, or any other representative specifically designated by the City for this Project, including any construction manager hired by the City.
1.5 Coordination and Cooperation with Construction Manager. The City may hire a construction manager to administer and coordinate all or any part of the Project on its behalf. If the City does so, it shall provide a copy of its agreement with the construction manager so that the Consultant will be fully aware of the duties and responsibilities of the construction manager.
The Consultant shall cooperate with the construction manager and respond to any requests or directives authorized by the City to be made or given by the construction manager. The Consultant shall request clarification from the City in writing if the Consultant should have any questions regarding the authority of the construction manager.
2. INITIAL PLANNING PHASE.
During the initial planning phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
2.1 Project Feasibility. Provide advice and assistance to City in determining the feasibility of the Proje ct, analysis of the type and quality of materials and construction to be selected, the site location, and other initial planning matters.
2.2 Meeting Budget and Project Goals. Consultant shall notify City in writing of potential complications, cost overruns, unusual conditions, and general needs that potentially impact the Project budget and time line, including the City’s Preliminary Construction Budget.
Consultant shall use its best judgment in determining the balance between the size, type and quality of c onstruction to achieve a satisfactory solution within the Project’s budget and 420
46700.00100\40935196.1
BB&K (2024) Exhibit A-2
construction allowance. It shall be the duty of the Consultant to design the Project within budget.
As discussed herein, including in Section 7.3, if the lowest responsive and responsible bid for the Project exceeds the budget by the stated amount, Consultant may be required to make the necessary changes in the drawing and specifications, at its sole cost and expense, to bring the bids within the required budget.
2.3 Permits, Approvals and Authorizations. As indicated in Section 3.5.4 of the Agreement, Consultant shall assist City in securing easements, encroachment permits, rights of way, dedications, infrastructures and road improvements, as well as coordinating with utilities and adjacent property owners.
3. SCHEMATIC PLAN PHASE.
During the schematic plan phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
3.1 Funding Documents. Consultant shall provide a site plan and all other P roject- related information necessary and required for an application by City to any federal, state, regional, or local agencies for funds to finance the construction Project.
3.2 Schematic Plans. In cooperation with City, Consultant shall prepare preliminary plans and studies, schematic drawings, site utilization plans, and phasing plans showing the scale and relationship of the components of the Project, the plot plan development at the site, and the proposed architectural concept of the buildings (“Schematic Plans”). Consultant shall incorporate the functional requirements of City into the Schematic Plans. The Schematic Plans shall meet all laws, rules and regulations of the State of California. The Schematic Plans shall show all rooms incorporated in each building of the Project in single-line drawings, and shall include all revisions required by City or by any federal, state, regional or local agency having jurisdiction over the Project. All architectural drawings for the Project shall be in a form suitable for reproduction.
3.3 Preliminary Project Budget. Consultant shall use the City’s Preliminary Construction Budget and its own expertise and experience with the Project to establish a preliminary project budget or allowance in a format required by City (“ Consultant’s Preliminary Project Budget”). The purpose of the Consultant’s Preliminary Project Budget is to show the probable Project cost in relation to City’s Preliminary Construction Budget and the construction standards of any applicable funding agency. If Consultant perceives site considerations which render t he Project expensive or cost prohibitive, Consultant shall disclose such conditions in writing to City immediately. As discussed herein, including in Section 7.3, if the lowest responsive and responsible bid for the Project exceeds the budget by more than the stated amount, Consultant may be required to make the necessary changes in the drawings and specifications, at its sole cost and expense, to bring the bids within the required budget Consultant shall provide a preliminary written time schedule for the performance of all construction work on the Project.
3.4 Copies of Schematic Plans and Other Documents. Consultant , at its own expense, shall provide a complete set of the Schematic Plans described herein for City’s review and approval. Additionally, at City’s expense, Consultant shall provide such documents as may be required by any federal, state, regional or local agencies concerned with the Project. Any additional copies required by City shall be provided at actual cost to City. 421
46700.00100\40935196.1
BB&K (2024) Exhibit A-3
4. DESIGN DEVELOPMENT PHASE.
During the design development phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
4.1 Design Development Documents. Once City provides Consultant with specific written approval of the Schematic Plans described herein, Consultant shall prepare design development documents consisting of: (1) site and floor plans; (2) elevations; and (3) any other drawings and documents sufficient to fix and describe the types and makeup of materials, as well as the size and character of the Project’s structural, mechanical and electrical systems, and to outline the Project specifications (“Design Development Documents”). The Design Development Documents shall be prepared in sufficient form to present to the City Council for approval.
4.2 Copies of Design Development and Other Documents. Consultant, at its own expense, shall provide a complete set of the Design Development Documents described herein for City’s review an d approval. Additionally, at City’s expense, Consultant shall provide such documents as may be required by any federal, state, regional or local agencies concerned with the Project. Any additional copies required by City shall be provided at actual cost to City.
4.3 Updated Project Budget. Consultant shall use its Preliminary Project Budget and expertise and experience with the Project to establish an updated estimate of probable construction costs, containing detail consistent with the Design Development Doc uments as set forth herein and containing a breakdown based on types of materials and specifications identified herein (“Consultant’s Updated Project Budget”).
4.4 Timetable. Consultant shall provide a written timetable for full and adequate completion of the Project to City.
4.5 Application for Approvals. Consultant shall assist City in applying for and obtaining required approvals from all federal, state, regional or local agencies concerned with the Project. Consultant shall furnish and process all architectu ral and engineering information required to prepare and process applications to applicable utilities in order to secure priorities and materials, to aid in the construction of the Project and to obtain final Project approval and acceptance by any of the above agencies as may be required.
4.6 Color and Other Aesthetic Issues. Consultant shall provide, for City’s review and approval, a preliminary schedule of all color materials and selections of textures, finishes and other matters involving an aesthetic decision about the Project.
5. FINAL WORKING DRAWINGS AND SPECIFICATIONS.
During the final working drawings and specifications phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
5.1 Final Working Drawings and Specifications. Once City provides Consultant with specific written approval of the Design Development Documents described herein, Consultant shall prepare such complete working drawings and specifications as are necessary for developing complete bids and for properly executing the Project work in an efficient and thorough manner (“Final Working Drawings and Specifications”). Such Final Working Drawings and Specifications shall be developed from the Schematic Plans and Design Development Documents approved by City. The Final Working Drawings and Specifications shall set forth in 422
46700.00100\40935196.1
BB&K (2024) Exhibit A-4
detail all of the following: (1) the Project construction work to be done; (2) the materials, workmanship, finishes, and equipment required for the architectural, structural, mechanical, and electrical systems; and (3) the utility service connection equipment and site work. As indicated in Section 3.9.2 of the Agreement, City may be requested to supply Consultant with the necessary information to determine the proper location of all improvements on and off site, including record drawings (“as-built drawings”) in City’s possession. Consultant will make a good -faith effort to verify the accuracy of such information by means of a thorough interior and exterior visual survey of site conditions. City shall also make a good -faith effort to verify the accuracy of the as -built drawings and provide any supplemental information to Consultant which may not be shown on the as-built drawings.
5.2 Form. The Final Working Drawings and Specifications must be in such form as will enable Consultant and City to secure the required permits and approvals from all federal, state, regional or local agencies concerned with the Project. In addition, the Final Working Drawings and Specifications must be in such f orm as will enable City to obtain, by competitive bidding, a responsible and responsive bid within the applicable budgetary limitations and cost standards. The Final Working Drawings and Specifications shall be clear and legible so that uniform copies may be on standard architectural size paper, properly indexed and numbered, and shall be capable of being clearly copied and assembled in a professional manner by Consultant.
5.3 Approval and Revisions. City shall review, study, and check the Final Working Drawings and Specifications presented to it by Consultant, and request any necessary revisions or obtain any necessary approvals by the City Council, subject to the approval of all federal, state, regional or local agencies concerned with the Project. Consultant shall make all City-requested changes, additions, deletions, and corrections in the Final Working Drawings and Specifications at no additional cost, so long as they are not in conflict with the requirements of public agencies having jurisdiction or prior approval, or inconsistent with earlier City direction or Consultant ’s professional judgment. Consultant shall bring any such conflicts and/or inconsistencies to the attention of City. The Parties agree that Consultant, and not the City, possesses the r equisite expertise to determine the constructability of the Final Working Drawings and Specifications.
However, the City reserves the right to conduct one or more constructability review processes with the Final Working Drawings and Specifications, and to hire an independent architect or other consultant to perform such reviews. Any such independent constructability review shall be at City’s expense. Consultant shall make all City -requested changes, additions, deletions, and corrections in the Final Work ing Drawings and Specifications which may result from any constructability review, at no additional cost to the City, so long as they are not in conflict with the requirements of public agencies having jurisdiction or prior approval, or inconsistent with earlier City direction or Consultant ’s professional judgment. If such changes, additions, deletions or corrections are inconsistent with prior City direction, Consultant shall make such alterations and be compensated therefore pursuant to the Additional Services provision of this Agreement.
5.4 Costs of Construction. It is understood by Consultant that should the Final Working Drawings and Specifications be ordered by City, City shall specify the sum of money set aside to cover the total cost of construction of the work, exclusive of Consultant’s fees. Should it become evident that the total construction cost will exceed the specified sum, Consultant shall at once present a statement in writing to the City’s Representative setting forth this fact and giving a full statement of the cost estimates on which the conclusion is based.
5.5 Copies of Final Working Drawings and Specifications and Other Documents.
Consultant, at its own expense, shall provide a complete set of the Final Working Drawings and Specifications described herein for City’s review and approval. Additionally, at City’s expense, 423
46700.00100\40935196.1
BB&K (2024) Exhibit A-5
Consultant shall provide such documents as may be required by any federal, state, regional or local agencies concerned with the Project. Any additional copies required by City shall be provided at actual cost to City.
6. CONSTRUCTION CONTRACT DOCUMENTS.
During the construction contract documents phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
6.1 Bid and Contract Documents. If so required by City, Consultant shall assist City in the completion of all bid and cons truction documents, including but not limited to, the Notice Inviting Bids, Instructions to Bidders, Contract Bid Forms (including Alternate Bids as requested by City), `Contract, General Conditions, Supplementary General Conditions, Special Conditions, DVBE and other applicable affirmative action documents, Performance Bond, Payment Bond, Escrow Agreement for Security Deposits, and any other certifications and documents required by federal, state and local laws, rules and regulations which may be reasonably required in order to obtain bids responsive to the specifications and drawings. All such documents shall be subject to the approval of City and City’s legal counsel.
6.2 Final Estimate. At the time of delivery of these bid and construction documents, which shall include the Final Working Drawings and Specifications (collectively referred to herein as the “Construction Documents”), Consultant shall provide City with its final estimate of probable construction cost (“Consultant’s Final Estimate”). As discussed herein, including in Section 7.3, it shall be the Consultant’s duty to design the Project within budget.
7. BID PHASE.
During the bid phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
7.1 Reproducible Construction Documents. Once City provides Consultant with specific written approval of the Construction Documents and Consultant ’s Final Estimate, Consultant shall provide to City one set of reproducible Construction Documents.
7.2 Distribution of Contract Documents and Review of Bids. Consultant shall assist City in distributing the Construction Documents to bidders and conducting the opening and review of bids for the Project.
7.3 Over Budget. If the apparent lowest responsive and responsible bid on the Project exceeds the Consultant’s Final Estimate by more than five percent (5%), City may request Consultant to amend, at Consultant’s sole cost and expense, the Final Drawings and Specifications in order to rebid the Project and receive a lowest responsive and r esponsible bid equal to or less than the Consultant’s Final Estimate. All revisions necessary to bring the lowest responsible and responsive bid within the Consultant ’s Final Estimate, including any omissions, deferrals or alternates, shall be made in consultation with, and subject to the approval of, the City.
8. CONSTRUCTION PHASE.
During the construction phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
424
46700.00100\40935196.1
BB&K (2024) Exhibit A-6
8.1 Observation. The Project Consultant shall observe work executed from the Final Working Drawings and Specifications in person, provided that City may, in its discretion, consent to such observation by another competent representative of Consultant.
8.2 General Administration. Consultant shall provide general administration of the Construction Documents and the work performed by the contractors.
8.3 Pre-Construction Meeting. Consultant shall conduct one or more pre- construction meetings, as the City determines is needed for the Project, with all interested Parties.
8.4 Site Visits of Contractor’s Work. Consultant shall conduct site visits to observe each contractors’ work for general conformance with the Construction Documents and with any approved construction schedules or milestones. Such site visits shall be conducted as often as are necessary and appropriate to the stage of construction, according to the City’s sole discretion, but in no event less than weekly.
8.5 Site Visits of Inspector’s Work. Consultant shall conduct site visits to communicate and observe the activities of the City inspectors. Such site visits shall be conducted as often as is mutually acceptable to Consultant and City. Consultant shall direct the City inspectors and the Project contractors to coordinate the preparation of record drawings indicating dimensions and location of all “as-built” conditions, including but not limited to, underground utility lines.
8.6 Coordination of Subconsultants. Consultant shall cause all architects, engineers and other consultants, as may be hired by Consultant or City, to observe the work completed under their disciplines as required, and approve and review all test results for general conformance with the Construction Documents.
8.7 Reports. Consultant shall make regular reports as may be required by applicable federal, state or local laws, rules or regulations, as well as the federal, state, regional or local agencies concerned with the Project.
8.8 Construction Meetings; Minutes. Consultant shall attend all construction meetings and provide written reports/minutes to the City after each construction meeting in order to keep City informed of the progress of the work. Such meetings shall occur at a frequency necessary for the progress of the Project work, according to the City’s sole discretion, but no less than weekly.
8.9 Written Reports. Consultant shall make written reports to City as necessary to inform City of problems arising during construction, changes contemplated as a result of each such problems, and progress of the Project work.
8.10 Written Records. Consultant shall keep accurate written records of the progress and quality of the Project work and the time schedules, and shall advise the contractors and City of any deviations from the time schedule which could delay timely completion of the Project.
8.11 Material and Test Reports. Consultant shall check and process, in a timely manner, all required material and test reports for the Project work. In addition, Consultant shall provide notice of any deficiencies in material or work reflected in such reports, as well as its recommendation for correction of such deficiencies, to the contractors and City. 425
46700.00100\40935196.1
BB&K (2024) Exhibit A-7
8.12 Review and Response to Submissions. Consultant shall review and respond, in a timely manner, to all schedules, submittals, shop drawings, samples, information requests, change requests, and other submissions of the contractor and subcontractors for compliance with, or alterations and additions to, the Construction Documents. Consultant ’s review and response shall be done in such a manner so as to ensure the timely and uni nterrupted progress of the Project work.
8.13 Rejection of Work. Consultant shall promptly reject, as discussed with City, work or materials which do not conform to the Construction Documents. Consultant shall immediately notify the City and contractor(s) of such rejections. Consultant shall also have the authority to recommend to the City that additional inspection or testing of the work be performed, whether or not such work is fabricated, installed or completed.
8.14 Substitutions. Consultant shall consult with City, in a timely manner, with regard to substitution of materials, equipment and laboratory reports thereof, prior to the City’s final written approval of such substitutions. Consultant’s consultation shall be done in such a manner so as to ensure the timely and uninterrupted progress of the Project work.
8.15 Revised Documents and Drawings. Consultant shall prepare, at no additional expense to City, all documents and/or drawings made necessary by errors and omissions in the originally approved Construction Documents.
8.16 Change Requests and Material Changes. Consultant shall evaluate and advise City, in a timely manner and in writing, of any change requests and material change(s) which may be requested or necessary in the Project plans and specifications. Con sultant shall provide the City with its opinion as to whether such change requests should be approved, denied or revised.
If the City has not hired a construction manager or other person to do so, the Consultant shall prepare and execute all change orders and submit them to the City for authorization. If the City has designated a construction manager or other person to prepare all change orders, the Consultant shall review all change orders prepared by such person, execute them and deliver them to the City for authorization if they meet with the Consultant ’s approval, or submit them to the City with recommendations for revision or denial if necessary. Consultant shall not order contractors to make any changes affecting the contract price without approval by City of such a written change order, pursuant to the terms of the Construction Documents. Consultant may order, on its own responsibility and pending City Council approval, changes necessary to meet construction emergencies, if written approval of City’s Representative is first secured.
8.17 Applications for Payment. Consultant shall examine, verify and approve contractor’s applications for payment, and shall issue certificates for payment in amounts approved by the City’s inspector.
8.18 Final Color and Product Selection. Consultant shall coordinate final color and product selection with City’s original design concept.
8.19 Substantial Completion. Consultant shall determine the date of substantial completion, in consultation with the City.
8.20 Punch List. After determ ining that the Project is substantially complete, Consultant shall participate in the inspection of the Project and shall review all remaining deficiencies and minor items needed to be corrected or completed on the Project, including those identified on the punch list prepared by the contractor (“Punch List Items”). Consultant shall notify 426
46700.00100\40935196.1
BB&K (2024) Exhibit A-8
contractor in writing that all Punch List Items must be corrected prior to final acceptance of the Project and final payment. Consultant shall also notify City of all Punch List Items.
8.21 Warranties. Consultant shall review materials assembled by the contractor and subcontractors with regard to all written warranties, guarantees, owners’ manuals, instruction books, diagrams, record “as built” drawings, and any other materials required from the contractors and subcontractors pursuant to the Construction Documents. Consultant shall coordinate and provide these materials to the City.
8.22 Certificate of Completion. Consultant shall participate in any further inspections of the Pr oject necessary to issue Consultant ’s Certificate of Completion and final certificate for payment.
8.23 Documents for Project Close- Out. Consultant shall cause all other architects, engineers and other consultants, as may be hired by Consultant , to file any and all required documentation with the City or other governmental authorities necessary to close out the Project.
Consultant shall assist the City in obtaining such documentation from all other architects, engineers, or other consultants.
9. AS-BUILT DRAWINGS.
During the as-built drawings phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
9.1 As-Built Drawings and Specifications. Not later than thirty (30) days after substantial completion of the Project, before receipt of final payment, Consultant shall review and forward the Final Working Drawings and Specifications, indicating on them all changes made by change orders or otherwise pursuant to the Construction Documents, as well as all info rmation called for on the specifications, thus producing an “as -built” set of Final Working Drawings and Specifications (“As-Built Drawings and Specifications”). The As-Built Drawings and Specifications shall show, among other things, the location of all concealed pipe, buried conduit runs and other similar elements within the completed Project. Consultant shall personally review and certify that the As-Built Drawings and Specifications are a correct representation of the information supplied to Consultant by any inspectors and the contractor, and shall obtain certifications from any inspectors and the contractor that the drawings are correct.
9.2 Approval. Once City provides Consultant with specific written approval of the As- Built Drawings and Specifications, Consultant shall forward to City the complete set of original As-Built Drawings and Specifications or a complete set of reproducible duplicate As -Built Drawings and Specifications. The tracing shall be of such quality that clear and legible prints may be made without appreciable and objectionable loss of detail.
9.3 Documents for Final Payment. Prior to the receipt of Consultant’s final payment, Consultant shall forward to City all of the following: (1) one clear and legible set of reproductions of the computations; (2) the original copy of the specifications; (3) the As -Built Drawings and Specifications as required herein; and (4) Consultant’s Certificate of Completion.
10. WARRANTY PERIOD.
During the warranty period phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
427
46700.00100\40935196.1
BB&K (2024) Exhibit A-9
10.1 Advice. Consultant shall provide advice to City on apparent deficiencies in the Project during any applicable warranty periods for the Project. 428
46700.00100\40935196.1
BB&K (2024) Exhibit B-1
EXHIBIT “B”
FEE AND PHASING/FUNDING SCHEDULES
1. FEE SCHEDULE.
Consultant will invoice City on a monthly cycle based on the following fee schedule.
Consultant will include with each invoice a detailed progress report that indicates the amount of budget spent on each phase and the total amount spent against the Total Compensati on.
Consultant will inform City regarding any out -of-scope work being performed by Consultant for which Consultant intends to seek compensation from City.
2. PHASING/FUNDING SCHEDULE.
Progress payments towards Total Compensation shall never exceed the foll owing percentages of Total Compensation as of the phase indicated:
Initial Planning Phase: ________ percent (%____)
Schematic Plan Phase: ________ percent (%____)
Design Development Phase: ________ percent (%____) Final Working Drawings & Specifications Phase: ________ percent (%____) Construction Contract Documents Phase: ________ percent (%____) Bid Phase: ________ percent (%____)
Construction Phase: ________ percent (%____)
As-Built Drawings Phase: ________ percent (%____)
Warranty Period Phase: ________ percent (%____)
Note: No Phasing/Funding Schedule is necessary until a project task is issued under the contract
429
46700.00100\40935196.1
BB&K (2024) Exhibit C-1
EXHIBIT “C”
COMPENSATION RATES AND REIMBURSABLE EXPENSES
1. HOURLY COMPENSATION RATES. BELOW
2. REIMBURSABLE EXPENSES. BELOW
3. ADDITIONAL CONSULTANTS.
If City requires Consultant to hire consultants to perform any Additional Services, Consultant shall be compensated therefore at the Consultant ’s actual hourly rates plus 15% .
Owner shall have the authority to review and approve the rates of any such consultants. 430
46700.00100\40935196.1
BB&K (2024) -1-
C
ITY OF ONTARIO
DESIGN SERVICES AGREEMENT
1. PARTIES AND DATE.
This Agreement is made and entered into as of ____________, by and between the City of Ontario, a municipal corporation organized and operating under the laws of the State of California with its principal place of business at 303 East “B” Street, Ontario, California 91764 - 4196, County of San Bernardino, State of California (“City”), and Frederick Fisher & Partners, a Corporation, with its principal place of business at 12248 Santa Monica Boulevard, Los Angeles, CA 90025 (hereinafter referred to as “ Consultant”). City and Consultant are sometimes individually referred to herein as “Party” and collectively as “Parties.”
2. RECITALS.
2.1 Cit y . City is a municipal corporation organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose.
2.2 Consultant. C onsultant desires to perform and assume responsibility for the provision of certain professional architectural design services required by the City on the terms and conditions set forth in this Agreement. Consultant warrants that it is fully licensed, qualified, and willing to perform the services required by this Agreement; provided, however, that if Consultant is a corporation or other organization, the Project Consultant designated pursuant to Section 3.2, and not the Consultant itself, shall be fully licensed to practice as an architect in the State of California.
2.3 Project. City desires to engage Consultant to render such services for the Museum Improvements On -Call Architectural Services ("Project") as set forth in this Agreement.
3. T ERMS
3.1 Employment of Consultant.
3.1.1 S cope of Services . Consultant promises and agrees to furnish to City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional architectural and related services necessary for the full and adequate completion of the Project consistent with the provisions of this Agreement (hereinafter referred to as “Services”). The Services are more particularly described throughout this Agreement, including Exhibit “A” attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, any exhibits 431
46700.00100\40935196.1
BB&K (2024) -2-
attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. All Services performed by Consultant shall be subject to the sole and discretionary approval of the City, which approval shall not be unreasonably withheld.
3.1.2 Term. The term of this Agreement shall be from November 4, 2024, to November 4, 2027, unless earlier terminated as provided herein. The City shall have the unilateral option, at its sole discretion, to renew this Agreement automatically for no more than two (2) additional one-year terms. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines.
3.2 Project Consultant; Key Personnel.
3.2.1 Project Architect. Consultant shall name a specific individual to act as Project Consultant , subject to the approval of City. Consultant hereby designates Frederick Fisher (License No. C10281) to act as the Project Architect for the Project. The Project Architect shall: (1) maintain oversight of the Services; (2) have full authority to represent and act on behalf of the Consultant for all purposes under this Agreement; (3) supervise and direct the Services using his or her best skill and attention; (4) be responsible for the means, methods, techniques, sequences and procedures used for the Services; (5) adequately coordinate all portions of the Services; and (6) act as principal contact with City and all contractors, consultants, engineers and inspectors on the Project. Any change in the Project Architect shall be subject to the City’s prior written approval, which approval shall not be unreasonably withheld. The new Project Architect shall be of at least equal competence as the prior Project Architect . In the event that City and Consultant cannot agree as to the substitution of a new Project Architect, City shall be entitled to terminate this Agreement for cause.
3.2.2 Key Personnel. In addition to the Project Architect , Consultant has represented to the City that certain additional key personnel, engineers and consultants will perform the Services under this Agreement. Should one or more of such personnel, engineers or consultants become unavailable, Consultant may substitute others of at least equal competence upon written approval of the City. In the event that City and Consultant cannot agree as to the substitution of key personnel, engineers or consultants, City shall be entitled to terminate this Agreement for cause. The key additional personnel, engineers and consultants for performance of this Agreement are as follows: Joseph Coriaty, Partner -In-Charge; Marisa Kurtzman, Programming & Planning Director; Nathan Prevendar, Project Manager; Takashige Ikawa.
3.3 Hiring of Consultants and Personnel.
3.3.1 Right to Hire or Employ . Consultant shall have the option, unless City objects in writing after notice, to employ at its expense architects, engineers, experts or other consultants qualified and licensed to render services in connection with the planning and/or administration of the Project, and to delegate to them such duties as Consultant may delegate without relieving Consultant from administrative or other responsibility under this Agreement.
Consultant shall be responsible for the coordination and cooperation of Consultant ’s architects, engineers, experts or other consultants. All consultants, including changes in consultants, shall be subject to approval by City in its sole and reasonable discretion. Consultant shall notify City of the identity of all consultants at least fourteen (14) days prior to their commencement of work to allow City to review their qualifications and approve to their participation on the Project in its sole and reasonable discretion.
432
46700.00100\40935196.1
BB&K (2024) -3-
3.3.2 Qualification and License. All architects, engineers, experts and other consultants retained by Consultant in performance of this Agreement shall be qualified to perform the Services assigned to them, and shall be licensed to practice in their respective professions, where required by law.
3.3.3 S tandards and Insurance. All architects, engineers, experts and other consultants hired by Consultant shall be required to meet all of the same standards and insurance requirements set forth in this Agreement, unless other standards or requirements are approved by the City in writing. Unless changes are approved in writing by the City, Consultant ’s agreements with its consultants shall contain a provision making them subject to all provisions stipulated in this Agreement.
3.3.4 A
ssignments or Staff Changes . Consultant shall promptly obtain written City approval of any assignment, reassignment or replacement of such architects, engineers, experts and consultants, or of other staff changes of key personnel working on the Project. As provided in the Agreement, any changes in Consultant’s consultants and key personnel shall be subject to approval by City.
3.3.5 D
raftsman and Clerical Support. Draftsmen and clerical personnel shall be retained by Consultant at Consultant’s sole expense.
3.4 Standard of Care.
3.4.1 Standard of Care. Consultant shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals qualified to perform the Services in the same discipline in the State of California, and shall be responsible to City for damages sustained by the City and delays to the Project as specified in the indemnification provision of this Agreement. Without limiting the foregoing, Consultant shall be fully responsible to the City for any increased costs incurred by the City as a result of any such delays in the design or construction of the Project. Consultant represents and maintains that it is skilled in the professional calling necessary to perform the Services. Consultant warrants and represents that all of its employees, architects, engineers, experts and other consultants shall have sufficient skill and experience to perform the Services assigned to them. Finally, Consultant represents that it, its employees, architects, engineers, experts and other consultants have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services assigned to or rendered by them and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant’s failure to comply with the standard of care provided for herein.
3.4.2 P
erformance of Employees. Any employee or consultant who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee or consultant who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project.
433
46700.00100\40935196.1
BB&K (2024) -4-
3.5 Laws and Regulations.
3.5.1 Knowledge and Compliance. Consultant shall keep itself fully informed of and in compliance with all applicable local, state and federal laws, rules and regulations in any manner affecting the performance of the Services or the Project, and shall give all notices required of the Consultant by law. Consultant shall be liable, pursuant to the standard of care and indemnification provisions of this Agreement, for all violations of such laws and regulations in connection with its Services. Co nsultant shall defend, indemnify and hold City, its officials, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.
3.5.2 D
rawings and Specifications . Consultant shall cause all drawings and specifications to conform to any applicable requirements of federal, state and local laws, rules and regulations, including the Uniform Building Code, in effect as of the time the drawings and specifications are prepared or revised during the latest phase of the Services described in Exhibit “A” attached hereto. Any significant revisions made necessary by changes in such laws, rules and regulations after this time may be compensated as Additional Services which were not known or reasonably should not have been known by Consultant. Consultant shall cause the necessary copies of such drawings and specifications to be filed with any governmental bodies with approval jurisdiction over the Project, in accordance with the Services described in Exhibit “A” attached hereto. For the preparation of all such drawings and specifications, the Consultant shall use Computer Aided Design Drafting (“CADD”) (e.g., AutoCAD) or other technology acceptable to the Consultant and City.
3.5.3 A
mericans with Disabilities Act . Consultant will use its best professional efforts to interpret all applicable federal, state and local laws, rules and regulations with respect to access, including those of the Americans with Disabilities Act (“ADA”). Consultant shall inform City of the existence of inconsistencies of which it is aware or reasonably should be aware between federal and state accessibility laws, rules and regulations, as well as any other issues which are subject to conflicting interpretations of the law, and shall provide the City with its interpretation of such inconsistencies and conflicting interpretations. Unless Consultant brings such inconsistencies and conflicting interpretations to the attention of the City and requests City’s direction on how to proceed, the Consultant’s interpretation of such inconsistencies and conflicting interpretations shall be the sole responsibility and liability of Consultant, and the Consultant shall correct all plans, specifications and other documents prepared for the Project at no additional cost if its interpretations are shown to be incorrect. In the event that the Consultant request’s City’s direction on how to proceed with respect to any inconsistent and/or conflicting interpretation, the Consultant shall be responsible to the City only pursuant to the indemnification provisions of this Agreement.
3.5.4 P
ermits, Approvals and Authorizations . Consultant shall provide City with a list of all permits, approvals or other authorizations required for the Project from all federal, state or local governmental bodies with approval jurisdiction over the Project. Consultant shall then assist the City in obtaining all such permits, approvals and other authorizations. The costs of such permits, approvals and other authorizations shall be paid by the City.
3.5.5 W
ater Quality Management and Compliance. Consultant shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Services including, without limitation, all applicable provisions of the City’s ordinances 434
46700.00100\40935196.1
BB&K (2024) -5-
regulating water quality and storm water; the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000- 14950); and any and all regulations, policies, or permits issued pursuant to any such authority.
Consultant shall additionally comply with the lawful requirements of the City, and any other municipality, drainage district, or other local agency with jurisdiction over the location where the Services are to be conducted, regulating water quality and storm water discharges. Failure to comply with laws, regulations, and ordinances listed in this Section is a violation of federal and state law.
3.6 Independent Contractor.
3.6.1 Control and Payment of Subordinates . City retains Consultant on an independent contractor basis and Consultant is not an employee of City. Consultant is not an employee for state tax, federal tax or any other purpose, and is not entitled to the rights or benefits afforded to City’s employees. Any additional personnel performing the Services under this Agreement on behalf of Consultant shall also not be employees of City, and shall at all times be under Consultant’s exclusive direction and control. Consultant shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers’ compensation insurance.
3.7 Schedule of Services.
3.7.1 Consultant Services. Consultant shall fully and adequately complete the Services described in this Agreement and in Exhibit “A” attached hereto and incorporated herein by reference.
3.7.2 Ti mely Performance Standard. Consultant shall perform all Services hereunder as expeditiously as is consistent with professional skill and care, as well as the orderly progress of the Project work so as not to be the cause, in whole or in part, of delays in the completion of the Project or in the achievement of any Project milestones, as provided herein.
Specifically, Consultant shall perform its Services so as to allow for the full and adequate completion of the Project within the time required by the City and within any completion schedules adopted for the Project. Consultant agrees to coordinate with City’s staff, contractors and consultants in the performance of the Services, and shall be available to City’s staff, contractors and consultants at all reasonable times.
3.7.3 P
erformance Schedule. Consultant shall prepare an estimated time schedule for the performance of Consultant ’s Services, to be adjusted as the Project proceeds.
Such schedule shall be subject to the City’s review and approval, which approval shall not be unreasonably withheld, and shall include allowances for periods of time required for City’s review and approval of submissions, and for approvals of authorities having jurisdiction over Project approval and funding. If City and Consultant cannot mutually agree on a performance schedule, City shall have the authority to immediately terminate this Agreement. The schedule shall not be exceeded by Consultant without the prior written approval of City. If the Consultant’s Services are not com pleted within the time provided by the agreed upon performance schedule, or any milestones established therein, it is understood, acknowledged and agreed that the City will suffer damage for which the Consultant will be responsible.
435
46700.00100\40935196.1
BB&K (2024) -6-
3.7.4 Excusable Delays . Any delays in Consultant ’s work caused by the following may be added to the time for completion of any obligations of Consultant: (1) the actions of City or its employees; (2) the actions of those in direct contractual relationship with City; (3) the actions of any governmental agency having jurisdiction over the Project; (4) the actions of any parties not within the reasonable control of the Consultant; and (5) any Force Majeure Event (as defined herein) or other unforeseen occurrence not due to any fault or negligence on the part of Consultant. Neither the City nor the Consultant shall be liable for damages, liquidated or otherwise, to the other on account of such delays.
3.7.5 For ce Majeure Events. Neither City nor Consultant shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the non- performing Party. For purposes of this Agreement, such circumstances include a Force Majeure Event. A Force Majeure Event shall mean an event that materially affects a Party’s performance and is one or more of the following: (1) Acts of God or other natural disasters; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and un foreseeable delay in the issuance of permits or approvals by governmental authorities that are required for the services); (4) strikes and other organized labor action occurring at the site and the effects thereof on the services, only to the extent such strikes and other organized labor action are beyond the control of Consultant and its subcontractors, and to the extent the effects thereof cannot be avoided by use of replacement workers; and (5) pandemics, epidemics or quarantine restrictions. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of a public agency applicable to the Services and Agreement. Should a Force Majeure Event occur, the non- performing Party shall, within fifteen (15) calendar days of the beginning of an Force Majeure Event, give written notice to the other Party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement. Force Majeure Events shall not entitle Consultant to any additional compensation. Notwithstanding the foregoing in this section, the City may still terminate this Agreement in accordance with the termination provisions of this Agreement.
3.7.6 R
equest for Excusable Delay Credit . The Consultant shall, within fifteen (15) calendar days of the beginning of any excusable delay, notify the City in writing of the causes of delay (unless City grants in writing a further period of time to file such notice prior to the date of final payment under the Agreement). City will then ascertain the facts and the extent of the delay, and grant an extension of time for completing the Services when, in its sole judgment, the findings of fact justify such an extension. The City’s findings of fact thereon shall be final and conclusive on the Parties . Extensions of time shall apply only to that portion of the Services affected by the delay and shall not apply to other portions of the Services not so affected. The sole remedy of Consultant for extensions of time shall be an extension of the performance time at no cost to the City. If Additional Services are required as a result of an excusable delay, the Parties shall mutually ag ree thereto pursuant to the Additional Services provision of this Agreement. Should Consultant make an application for an extension of time, Consultant shall submit evidence that the insurance policies required by this Agreement remain in effect during the requested additional period of time.
3.8 Additional Services.
3.8.1 Request for Services . At City’s request, Consultant may be asked to perform services not otherwise included in this Agreement, not included within the basic services 436
46700.00100\40935196.1
BB&K (2024) -7-
listed in Exhibit “A” attached hereto, and/or not customarily furnished in accordance with generally accepted architectural practice.
3.8.2 Definition. As used herein, “Additional Services” mean: (1) any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary for the Consultant to perform at the execution of this Agreement; or (2) any work listed as Additional Services in Exhibit “A” attached hereto. Consultant shall not perform, nor be compensated for, Additional Services without prior written authorization from City and without an agreement between the City and Consultant as to the compensation to be paid for such services. City shall pay Consultant for any approved Additional Services, pursuant to the compensation provisions herein, so long as such services are not made necessary through the fault of Consultant pursuant to the indemnification provision of this Agreement.
3.8.3 E
xamples of Additional Services. Such Additional Services shall not include any redesign or revisions to drawings, specifications or other documents when such revisions are necessary in order to bring such documents into compliance with applicable laws, rules, regulations or codes of which Consultant was aware or should have been aware pursuant to the laws and regulations provision of this Agreement above. Such Additional Services may include, but shall not be limited to:
(a) S
eparately Bid Portions of Project. Plan preparation and/or administration of work on portions of the Project separately bid. (b) Furniture and Interior Design. Assistance to City, if requested, for the selection of moveable furniture, equipment or articles which are not included in the Construction Documents.
(c) Fault of Contractor. Services caused by delinquency, default or insolvency of contractor, or by major defects in the work of the contractor, provided that any such services made necessary by the failure of Consultant to detect and report such matters when it reasonably should have done so shall not be compensated. (d) Inconsistent Approvals or Instructions . Revisions in drawings, specifications or other documents when such revisions are inconsistent with written approvals or instructions previously given and are due to causes beyond the control of Consultant. (e) Legal Proceedings. Serving as an expert witness on City's behalf or attending legal proceedings to which the Consultant is not a party. (f) Damage Repair. Supervision of repair of damages to any structure. (g) Extra Environmental Services. Additional work required for environmental conditions (e.g. asbestos or site conditions) not already contemplated within the Consultant's services for the Project.
3.9 City Responsibilities. City’s responsibilities shall include the following:
3.9.1 Data and Information. City shall make available to Consultant all necessary data and information concerning the purpose and requirements of the Project, including scheduling and budget limitations, objectives, constraints and criteria. As part of the budget 437
46700.00100\40935196.1
BB&K (2024) -8-
limitation information, the City shall provide the Consultant with a preliminary construction budget (“City’s Preliminary Construction Budget”).
3.9.2 Project Survey. If required pursuant to the scope of the Project and if requested by Consultant , City shall furnish Consultant with, or direct Consultant to procure at City’s expense, a survey of the Project site prepared by a registered surveyor or civil engineer, any other record documents which shall indicate existing structures, land features, improvements, sewer, water, gas, electrical and utility lines, topographical information and boundary dimensions of the site, and any other such pertinent information.
3.9.3 B id Phase. Distribute Construction Documents to bidders and conduct the opening and review of bids for the Project.
3.9.4 Tes ting. Retain consultant(s) to conduct chemical, mechanical, soils, geological or other tests required for proper design of the Project, and furnish such surveys, borings, test pits, and other tests as may be necessary to reveal conditions of the site which must be known to determine soil condition or to ensure the proper development of the required drawings and specifications.
3.9.5 R
equired Inspections and Tests. Retain consultant(s) to conduct materials testing and inspection or environmental/hazardous materials testing and inspection pursuant to any applicable laws, rules or regulations.
3.9.6 Fees of Reviewing or Licensing Agencies. Directly pay or reimburse the payment of all fees required by any reviewing or licensing agency, or other agency having approval jurisdiction over the Project.
3.9.7 Cit
y’s Representative . The City hereby designates the City Manager, or his or her designee, to act as its representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract. The City Manager hereby designates Marissa Kucheck, Museum Director or his or her designee, as the City’s contact for the implementation of the Services hereunder. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.
3.9.8 R
eview and Approved Documents. Review all documents submitted by Consultant, including change orders and other matters requiring approval by the City Council or other officials. City shall advise Co nsultant of decisions pertaining to such documents within a reasonable time after submission, so as not to cause unreasonable delay as provided in the excusable delay provisions of this Agreement above.
3.10 Compensation.
3.10.1 Consultant’s Compensation for Basic Ser vices. City shall pay to Consultant, for the performance of all Services rendered under this Agreement, the total not to exceed amount of Two Hundred Fifty Thousand Dollars ($250,000) (“Total Compensation”).
This Total Compensation amount shall be based upon, and may be adjusted according to, the fee schedule and related terms and conditions attached hereto as Exhibit “B” and incorporated herein by reference. The Total Compensation, as may be adjusted upon mutual agreement, shall constitute complete and adequate payment for Services under this Agreement. 438
46700.00100\40935196.1
BB&K (2024) -9-
3.10.2 Payment for Additional Services . At any time during the term of this Agreement, City may request that Consultant perform Additional Services. As used herein, Additional Services means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement . Any additional work in excess of this amount must be approved by the City. If authorized, such Additional Services will be compensated at the rates and in the manner set forth in Exhibit “C” attached hereto and incorporated herein by r eference, unless a flat rate or some other form of compensation is mutually agreed upon by the Parties. If City requires Consultant to hire consultants to perform any Additional Services, Consultant shall be compensated therefore at the rates and in the manner set forth in Exhibit “C” attached hereto and incorporated herein by reference, unless a flat rate or some other form of compensation is mutually agreed upon by the Parties. City shall have the authority to review and approve the rates of any such consultants. In addition, Consultant shall be reimbursed for any expenses incurred by such consultants pursuant to the terms and conditions of Section 3.10.3.
3.10.3 R
eimbursable Expenses. Reimbursable expenses are in addition to compensation for the Services and Additional Services. Consultant shall not be reimbursed for any expenses unless authorized in writing by City, which approval may be evidenced by inclusion in Exhibit “C” attached hereto. Such reimbursable expenses shall include only those expenses which are reasonably and necessarily incurred by Consultant in the interest of the Project.
Consultant shall be required to acquire prior written consent in order to obtain reimbursement for the following: (1) extraordinary transportation expenses incurred in connection with the Project; (2) out-of-town travel expenses incurred in connection with the Project; (3) fees paid for securing approval of authorities having jurisdiction over the Project; (4) bid document duplication cost s in excess of $1,000; and (5) other costs, fees and expenses in excess of $1,000.
3.10.4 P
ayment to Consultant . Consultant ’s compensation and reimbursable expenses shall be paid by City to Consultant no more often than monthly. Such periodic payments shall be made based upon the percentage of work completed, and in accordance with the phasing and funding schedule provided in Exhibit “B” and the compensation rates indicated in Exhibit “C” attached hereto and incorporated herein by reference. In order to receive payment, Consultant shall present to City an itemized statement which indicates Services performed, percentage of Services completed, method for computing the amount payable, and the amount to be paid. The statement shall describe the amount of Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement, as well as those expenses for which reimbursement is requested for that statement period. The amount paid to Consultant shall never exceed the percentage amounts authorized by the phasing and funding schedule located in Exhibit “B” attached hereto. City shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon pursuant to the provisions of Civil Code Section 3320. Disputed amounts shall be resolved by the Parties in a mutually agreeable manner.
Payments made for Additional Services shall be made in installments, not more often than monthly, proportionate to the degree of completion of such services or in such other manner as the Parties shall specify when such services are agreed upon, and in accordance with any authorized fee or rate schedule. In order to receive payment, Consultant shall present to City an itemized statement which indicates the Additional Services performed, percentage of Additional Services completed, method for computing the amount payable, and the amount to be paid. The statement shall describe the amount of Additional Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within thirty (30) days of receiving such statement, review 439
46700.00100\40935196.1
BB&K (2024) -10-
the statement and pay all approved charges thereon pursuant to the provisions of Civil Code Section 3320. Disputed amounts shall be resolved by the Parties in a mutually agreeable manner.
Upon cancellation or termination of this Agreement, Consultant shall be compensated as set forth in the termination provision herein.
3.10.5 Withholding Payment to Consultant. The City may withhold payment, in whole or in part, to the extent reasonably necessary to protect the City from claims, demands, causes of action, costs, expenses, liabilities, losses, damages, or injuries of any kind to the extent arising out of or caused by the negligence, recklessness, or willful misconduct protected under the indemnification provisions of this Agreement. Failure by City to deduct any sums from a progress payment shall not constitute a waiver of the City’s right to such sums. The City may keep any moneys which would otherwise be payable at any time hereunder and apply the same, or so much as may be necessary therefor, to the payment of any expenses, losses, or damages as determined by the City, incurred by the City for which Consultant is liable under the Agreement or state law. Payments to the Consultant for compensation and reimbursable expenses due shall not be contingent on the construction, completion or ultimate success of the Project. Payment to the Consultant shall not be withheld, postponed, or made contingent upon receipt by the City of offsetting reimbursement or credit from Parties not within the Consultant’s reasonable control.
3.10.6 P
revailing Wages . Consultant is aware of the requirements of California Labor Code Sections 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. If the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and If the total compensation is $1,000 or more, Consultant agrees to fully comply with and to require its consultants to fully comply with such Prevailing Wage Laws. City shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.
Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant’s principal place of business and at the Project site. It shall be mandatory upon the Consultant and all subconsultants to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.
Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure of the Consultant or its consultants to comply with the Prevailing Wage Laws.
(a) R
egistrat ion/DIR Compliance. If the Services are being performed as part of an applicable “public works project” of over $25,000 when the project is for construction, alteration, demolition, installation, or repair work, or a public works project of over $15,000 when the project is for maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, the Consultant and all subconsultants performing such Services must be registered with the Department of Industrial Relations (“DIR”). Consultant shall maintain 440
46700.00100\40935196.1
BB&K (2024) -11-
registration for the duration of the P roject and require the same of any subconsultants. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Any stop orders issued by the Department of Industrial Relations against Consultant or any subconsultant that affect Consultant’s performance of services, including any delay, shall be Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Consultant caused delay and shall not be compensable by the City. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Consultant or any subconsultant.
3.10.7 Automated Clearing House (“ACH”) payments. It is the City’s policy to pay its consultant invoices via electronic fund transfers through the ACH network. All payments due and owing pursuant to a properly issued and correct invoice or under this Agreement shall be made through electronic ACH transfers, unless otherwise agreed upon by both Parties in writing.
Consultant shall provide the City with ACH payment details whereby the City shall initiate the ACH transfers to Consultant in the amount required pursuant to a properly issued and correct invoice or under this Agreement. Each Party shall undertake any and all required actions and execute any required documents, instruments, or agreements required to effectuate the requirements of this Section. In the event the City erroneously deposits funds into an account, or otherwise deposits funds to which Consultant is not entitled: (1) Consultant shall immediately notify the City and the financial institution; (2) Consultant shall not withdraw any of the funds which were erroneously deposited or to which Consultant is not entitled; and (3) Consultant author izes both the City and financial institution to take all actions necessary to correct the error and return to the City all funds erroneously deposited or to which Consultant is not entitled.
3.11 Notice to Proceed.
Consultant shall not proceed with performance of any Services under this Agreement unless and until the City provides a written notice to proceed.
3.12 Termination, Suspension and Abandonment.
3.12.1 Grounds for Termination; Consultant’s Termination for Cause. City hereby reserves the right to suspend or abandon, at any time and for any reason, all or any portion of the Project and the construction work thereon, or to terminate this Agreement at any time with or without cause. Consultant shall be provided with at least seven (7) days advanced written notice of such suspension, abandonment or termination. In the event of such suspension, abandonment or termination, Consultant shall be paid for Services and reimbursable expenses rendered up to the date of such suspension, abandonment or termination, pursuant to the schedule of payments provided for in this Agreement, less any claims against or damages suffered by City as a result of the default, if any, by Consultant. Consultant hereby expressly waives any and all claims for damages or compensation arising under this Agreement, except as set forth herein, in the event of such suspension, abandonment or termination. Consultant may terminate this Agreement for substantial breach of performance by the City such as failure to make payment to Consultant as provided in this Agreement.
3.12.2 C
ity’s Suspension of Work . If Consultant’s Services are suspended by City, City may require Consultant to resume such Services within ninety (90) days after written notice 441
46700.00100\40935196.1
BB&K (2024) -12-
from City. When the Project is resumed, the Total Compensation and schedule of Services shall be equitably adjusted upon mutual agreement of the City and Consultant.
3.12.3 Documents and Other Data. Upon suspension, abandonment or termination, Consultant shall provide to City all preliminary studies, sketches, working drawings, specifications, computations, and all other Project Documents, as defined below, to which City would have been entitled at the completion of Consultant’s Services under this Agreement. Upon payment of the amount required to be paid to Con sultant pursuant to the termination provisions of this Agreement, City shall have the rights, as provided in this Agreement hereinafter, to use such Project Documents prepared by or on behalf of Consultant under this Agreement.
Consultant shall make such documents available to City upon request and without additional compensation other than as may be approved as a reimbursable expense.
3.12.4 E
mployment of other Consultants. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.
3.13 Ownership and Use of Documents; Confidentiality.
3.13.1 Ownership. All plans, specifications, original or reproducible transparencies of working drawings and master plans, preliminary sketches, architectural presentation drawings, structural computations, estimates and any other documents prepared pursuant to this Agreement, including, but not limited to, any other works of authorship fixed in any tangible medium of expression such as writings, physical drawings and data magnetically or otherwise recorded on computer diskettes (hereinafter referred to as the “Project Documents”) shall be and remain the property of City. Although the official copyright in all Project Documents shall remain with the Consultant or other applicable subcontractors or consultants, the Project Documents shall be the property of City whether or not the work for which they were made is executed or completed. Within thirty (30) calendar days following completion of the Project, Consultant shall provide to City copies of all Project Documents required by City. In addition, Consultant shall retain copies of all Project Documents on file for a minimum of fifteen (15) years following completion of the Project, and shall make copies available to City upon the payment of reasonable duplication costs. Before destroying the Project Documents following this retention period, Consultant shall make a reasonable effort to notify City and provide City with the opportunity to obtain the documents.
3.13.2 Rig
ht to Use . Consultant grants to City the right to use and reuse all or part of the Project Documents, at City’s sole discretion and with no additional compensation to Consultant, for the following purposes:
(a) The construction of all or part of this Project.
(b) The repair, renovation, modernization, replacement, reconstruction or expansion of this Project at any time;
(c) The construction of another project by or on behalf of the City for its ownership and use;
City is not bound by this Agreement to employ the services of Consultant in the event such documents are used or reused for these purposes. City shall be able to use or reuse the Project Documents for these purposes without risk of liability to the Consultant or third parties with respect 442
46700.00100\40935196.1
BB&K (2024) -13-
to the condition of the Project Documents, and the use or reuse of the Project Documents for these purposes shall not be construed or interpreted to waive or limit City’s right to recover for latent defects or for errors or omissions of the Consultant.
Any use or reuse by City of the Project Documents on any project other than this Project without employing the services of Consultant shall be at City’s own risk with respect to third parties. If City uses or reuses the Project Documents on any project other than this Project, it shall remove the Consultant’s seal from the Project Documents and hold harmless Consultant and its officers, directors, agents and employees from claims arising out of the negligent use or re-use of the Project Documents on such other project.
3.13.3 License. This Agreement creates a non -exclusive and perpetual license for City to copy, use, modify or reuse any and all Project Documents and any intellectual property rights therein. Consultant shall require any and all subcontractors and consultants to agree in writing that City is granted a non- exclusive and perpetual license for the work of such subcontractors or consultants performed pursuant to this Agreement.
3.13.4 R
ight to License. Consultant represents and warrants that Consultant has the legal right to license any and all copyrights, designs and other intellectual property embodied in the Project Documents that Consultant prepares or causes to be prepared pursuant to this Agreement. Consultant shall indemnify and hold City harmless pursuant to the indemnification provisions of this Agreement for any breach of this Section. Consultant makes no such representation and warranty in regard to previously prepared designs, plans, specifications, studies, drawings, estimates or other documents that were prepared by design professionals other than Consultant and provided to Consultant by City.
3.13.5 C onfidentiality . All Project Documents, either created by or provided to Consultant in connection with the performance of this Agreement, shall be held confidential by Consultant to the extent they are not subject to disclosure pursuant to the Public Records Act. All Project Documents shall not, without the written consent of City, be used or reproduced by Consultant for any purposes other than the performance of the Services. Consultant shall not disclose, cause or facilitate the disclosure of the Project Documents to any person or entity not connected with the performance of the Services or the Project. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City’s name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the written consent of City.
3.14 Indemnification.
3.14.1 To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Consultant, its officials, o fficers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s Services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses except such loss or damage caused by the sole negligence or willful misconduct of the City. Consultant's obligation to indemnify shall 443
46700.00100\40935196.1
BB&K (2024) -14-
survive expiration or termination of this Agreement and shall not be restricted to insur ance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers.
3.14.2 If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance as a “design professional” (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.
3.15 Insurance. Consultant shall not commence work under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has provided evidence satisfactory to the City that the subconsultant has secured all insurance required under this section.
3.15.1 Types of Insurance Required. As a con dition precedent to the effectiveness of this Agreement for work to be performed hereunder, and without limiting the indemnity provisions of the Agreement, Consultant shall, at its expense, procure and maintain in full force and effect for the duration of the Agreement the following policies of insurance. If the existing policies do not meet the insurance requirements set forth herein, Consultant agrees to amend, supplement or endorse the policies to do so.
3.15.2 A
dditional Insured . The City of Ontario, its officials, officers, employees, agents, and volunteers shall be named as additional insureds on Consultant ’s and its subconsultants’ policies of commercial general liability and automobile liability insurance using the endorsements and forms specified herein or exact equivalents.
3.15.3 Co
mmercial General Liability
(a) The Consultant shall take out and maintain, during the performance of all work under this Agreement, in amounts not less than specified herein, Commercial General Liability Insurance, in a form and with insurance companies acceptable to the City. (b) Coverage for Commercial General Liability insurance shall be at least as broad as the following: Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) or exact equivalent. Commercial General Liability Insurance must include coverage for the following:
(i) Bodily Injury and Property Damage
(ii) Personal Injury/Advertising Injury
(iii) Premises/Operations Liability
(iv) Products/Completed Operations Liability
(v) Aggregate Limits that Apply per Project
444
46700.00100\40935196.1
BB&K (2024) -15-
(vi) Explosion, Collapse and Underground (UCX) exclusion deleted
(vii) Contractual Liability with respect to this Contract (viii) Broad Form Property Damage
(ix) Independent Consultants Coverage
(c) The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; (3) products/completed operations liability; or (4) contain any other exclusion contrary to the Agreement.
(d) The policy shall give City, the City Council and each member of the City Council, its officers, employees, agents and City designated volunteers additional insured status using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements providing the exact same coverage.
(e) The general liability program may utilize either deductibles or provide coverage excess of a self-insured retention, subject to written approval by the City, and provided that such deductibles shall not apply to the City as an additional insured.
3.15.4 Automobile Liability
(a) At al l times during the performance of the work under this Agreement, the Consultant shall maintain Automobile Liability Insurance for bodily injury and property damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City.
(b) Coverage for automobile liability insurance shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).
(c) The policy shall give City, the City Council and each member of the City Council, its officers, employees, agents and City designated volunteers additional insured status.
(d) Subject to written approval by the City, the automobile liability program may utilize deductibles, provided that such deductibles shall not apply to the City as an additional insured, but not a self-insured retention.
3.15.5 Workers’ Compensation/Employer’s Liability
(a) Consultant certifies that he/she is aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self -insurance in accordance with the provisions of that code, and he/she will comply with such provisions before commencing work under this Agreement.
445
46700.00100\40935196.1
BB&K (2024) -16-
(b) To the extent Consultant has employees at any time during the term of this Agreement, at all times during the performance of the work under this Agreement, the Consultant shall maintain full compensation insurance for all persons employed directly by him/her to carry out the work contemplated under this Agreement, all in accordance with the “Workers’ Compensation and Insurance Act,” Division IV of the Labor Code of the State of California and any acts amendatory thereof, and Employer’s Liability Coverage in amounts indicated herein. Consultant shall require all subconsultants to obtain and maintain, for the period required by this Agreement, workers’ compensation coverage of the same type and limits as specified in this Section.
3.15.6 Professional Liability (Errors and Omissions)
(a) At all times during the performance of the work under this Agreement the Consultant shall maintain professional liability or Errors and Omissions insurance appropriate to its profession, in a form and with insurance companies acceptable to the City and in an amount indicated herein. This insurance shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Consultant. “Covered Professional Services” as designated in the policy must specifically include work performed under this Agreement. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer's duty to defend.
3.15.7 Minimum Policy Limits Required
(a) The following insurance limits are required for the Agreement:
Coverage Combined Single Limit
Commercial General Liability $2,000,000 per occurrence/ $4,000,000 aggregate for bodily injury, personal
injury, and property damage
Automobile Liability $2,000,000 per occurrence for bodily injury and property damage
Employer’s Liability $1,000,000 per occurrence
Professional Liability $2,000,000 per claim and aggregate (errors and omissions)
(b) Defense costs shall be payable in addition to the limits. (c) Requirements of specific coverage or limits contained in this Section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as Additional Insured pursuant to this Agreement.
3.15.8 Evidence Required
(a) Prior to execution of the Agreement, the Consultant shall file with the City evidence of insurance from an insurer or insurers certifying to the coverage of all insurance required herein. Such evidence shall include original copies of the ISO CG 00 01 (or insurer’s equivalent) signed by the insurer’s representative and Certificate of Insurance (Acord 446
46700.00100\40935196.1
BB&K (2024) -17-
Form 25-S or equivalent), together with required endorsements. All evidence of insurance shall be signed by a properly authorized officer, agent, or qualified representative of the insurer and shall certify the names of the insured, any additional insureds, where appropriate, the type and amount of the insurance, the location and operations to which the insurance applies, and the expiration date of such insurance.
3.15.9 Policy Provisions Required
(a) Consultant shall provide the City at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Consultant shall provide at least ten (10) days prior written notice of cancellation of any such policy due to non-payment of premium. If any of the required coverage is cancelled or expires during the term of this Agreement, the Consultant shall deliver renewal certificate(s) including the General Liability Additional Insured Endorsement to the City at least ten (10) days prior to the effective date of cancellation or expiration.
(b) The Commercial General Liability Policy and Automobile Policy shall each contain a provision stating that Consultant ’s policy is primary insurance and that any insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees, agents, or volunteers shall not contribute with this primary insurance. Policies shall contain or be endorsed to contain such provisions.
(c) The retroactive date (if any) of each policy is to be no later than the effective date of this Agreement. Consultant shall maintain such coverage continuously for a period of at least three years after the completion of the work under this Agreement. Consultant shall purchase a one (1) year extended reporting period A) if the retroactive date is advanced past the effective date of this Agreement; B) if the policy is cancelled or not renewed; or C) if the policy is replaced by another claims -made policy with a retroactive date subsequent to the effective date of this Agreement.
(d) All required insurance coverages, except for the professional liability coverage, shall contain or be endorsed to waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
(e) The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability.
Further the limits set forth herein shall not be construed to relieve the Consultant from liability in excess of such coverage, nor shall it limit the Consultant’s indemnification obligations to the City and shall not preclude the City from taking such other actions available to the City under other provisions of the Agreement or law.
3.15.10 Qualifying Insurers
(a) All policies required shall be issued by acceptable insurance companies, as determined by the City, which satisfy the following minimum requirements: Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A:VII and admitted to transact in the business of insurance in the State of California, or 447
46700.00100\40935196.1
BB&K (2024) -18-
otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.
3.15.11 Additional Insurance Provisions
(a) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Consultant, and any approval of said insurance by the City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Consultant pursuant to this Agreement, including but not limited to, the provisions concerning indemnification.
(b) If at any time during the life of the Agreement, any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement.
(c) The City may require the Consultant to provide complete copies of all insurance policies in effect for the duration of the Project. (d) Neither the City nor the City Council, nor any member of the City Council, nor any of the officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement.
3.15.12 Subconsultant Insurance Requirements
(a) Consultant shall not allow any subcontractors or subconsultants to commence work on any subcontract until they have provided evidence satisfactory to the City that they have secured all insurance required under this Section. Policies of commercial general liability insurance provided by such subcontractors or subconsultants shall be endorsed to name the City as an additional insured using ISO form CG 20 38 04 13 or an endorsement providing the exact same coverage. If requested by Consultant , City may approve different scopes or minimum limits of insurance for particular subcontractors or subconsultants.
3.16 Records.
Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identi fiable.
Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of five (5) years from the date of final payment under this Agreement.
3.17 Standardized Manufactured Items.
Consultant shall cooperate and consult with City in the use and selection of manufactured items on the Project, including but not limited to, paint, hardware, plumbing, mechanical and electrical equipment, fixtures, roofing materials and floor coverings. All such manufactured items 448
46700.00100\40935196.1
BB&K (2024) -19-
shall be standardized to City’s criter ia to the extent such criteria do not interfere with building design.
3.18 Limitation of Agreement.
This Agreement is limited to and includes only the work included in the Project described herein. Any additional or subsequent construction at the site of the P roject, or at any other City site, will be covered by, and be the subject of, a separate Agreement for architectural services between City and the Consultant chosen therefor by City.
3.19 Mediation.
Disputes arising from this Agreement may be submitted to mediation if mutually agreeable to the Parties hereto. The type and process of mediation to be utilized shall be subject to the mutual agreement of the Parties.
3.20 Successors and Assigns.
This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each Party to this Agreement. However, Consultant shall not assign or transfer by operation of law or otherwise any or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.
3.21 Asbestos Certification.
Consultant shall certify to City, in writing and under penalt y of perjury, that to the best of its knowledge, information and belief no asbestos -containing material or other material deemed to be hazardous by the state or federal government was specified as a building material in any construction document that the Consultant prepares for the Project. Consultant shall require all consultants who prepare any other documents for the Project to submit the same written certification. Consultant shall also assist the City in ensuring that contractors provide City with certification, in writing and under penalty of perjury, that to the best of their knowledge, information and belief no material furnished, installed or incorporated into the Project contains asbestos or any other material deemed to be hazardous by the state or federal government. These certifications shall be part of the final Project submittal. Consultant shall include statements in its specifications that materials containing asbestos or any other material deemed to be hazardous by the state or federal government are not to be included.
3.22 No Third Party Rights.
This Agreement shall not create any rights in, or inure to the benefits of, any third party except as expressly provided herein.
3.23 Governing Law.
This Agreement shall be construed in accordance with, and governed by, the laws of the State of California. Venue shall be in San Bernardino County. 449
46700.00100\40935196.1
BB&K (2024) -20-
3.24 Exhibits and Recitals.
All exhibits and recitals contained herein and attached hereto are material parts of this Agreement and are incorporated as if fully set forth.
3.25 Severability.
Should any provision in the Agreement be held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall continue in full force and effect.
3.26 Non-Waiver.
None of the provisions of this Agreement shall be considered waived by either Party , unless such waiver is specifically specified in writing.
3.27 Safety.
Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of its employees, consultant and subcontractors appropriate to the nature of the work and the conditions under which the work is to be performed.
3.28 Harassment Policy.
Consultant shall provide a copy of the City's Harassment Policy to each of its employees assigned to perform the tasks under this Agreement. Consultant shall submit to the City's Personnel Manager a statement signed by each of its employees who are assigned to perform the Services under this Agreement certifying receipt of City's Harassment Policy and certifying that they have read the Harassment Policy. A finding by the City that any of Consultant 's employees has harassed a City employee shall be grounds for appropriate discipline, up to and including such employee's removal from performance of this Agreement at City's request.
3.29 Delivery of Notices.
All notices permitted or required under this Agreement shall be given to the respective Parties at the following address, or at such other address as the respective Parties may provide in writing for this purpose:
CITY:
City of Ontario
303 East “B” Street
Ontario, CA 91764
Attn: Marissa Kucheck, Museum Director
CONSULTANT:
Frederick Fisher & Partners
12248 Santa Monica Blvd.
Los Angeles, CA 90025
Attn: Frederick Fisher
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the Party 450
46700.00100\40935196.1
BB&K (2024) -21-
at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
3.30 Time of Essence.
Time is of the essence for each and every provision of this Agreement.
3.31 City’s Right to Employ Other Consultants.
City reserves right to employ other consultants, including designers, in connection with this Project or other projects.
3.32 Prohibited Interests.
3.32.1 Solicitation. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability.
3.32.2 C
onflict of Interest. For the term of this Agreement, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
3.33 Equal Opportunity Employment.
Consultant represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or any other classification protected by federal or state law.
Such non- discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of City’s minority business enterprise program, affirmative action plan or other related programs or guidelines currently in effect or hereinafter enacted.
3.34 Labor Certification.
By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.
3.35 Subcontracting.
As specified in this Agreement, Consultant shall not subcontract any portion of the Services required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to each and every provision of this Agreement.
451
46700.00100\40935196.1
BB&K (2024) -22-
3.36 Supplemental Conditions.
Any supplemental conditions shall be attached as an exhibit to this Agreement, and that exhibit shall be incorporated herein by reference.
3.37 Entire Agreement.
This Agreement, with its exhibits, contains the entire agreement of the Parties hereto, and supersedes any and all other prior or contemporaneous negotiations, understandings and oral or written agreements between the Parties hereto. Each Party acknowledges that no representations, inducements, promises or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. Furthermore, any modification of this Agreement shall only be effective if in writing signed by all Parties hereto.
SIGNATURES ON FOLLOWING PAGE
452
46700.00100\40935196.1
BB&K (2024) -23-
SIGNATURE PAGE FOR DESIGN SERVICES AGREEMENT
BETWEEN THE CITY OF ONTARIO
AND FREDERICK FISHER & PARTNERS
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.
CITY OF ONTARIO FREDERICK FISHER & PARTNERS
By:
Its:
Printed Name:
By:
Its:
Printed Name:
[If Corporation, TWO SIGNATURES,
President OR Vice President AND Secretary
OR Treasurer REQUIRED]
Approved By:
Scott Ochoa
City Manager
Approved as to Form:
_____________________________________
Best Best & Krieger LLP
City Attorney
Attested By:
City Clerk
453
46700.00100\40935196.1
BB&K (2024) Exhibit A-1
EXHIBIT “A”
SCOPE OF SERVICES
1. GENERAL REQUIREMENTS.
1.1 Basic Services. Consultant agrees to perform all the necessary professional architectural, engineering (e.g. mechanical, electrical, plumbing, structural, site engineering, and any other necessary engineering services mutually agreeable to the Parties) and construction administration services for the Project in a timely and professional manner, consistent with the standards of the profession, including those provided for herein.
1.2 Exclusions from Basic Services. The following services shall be excluded from the basic services listed above: COMMON EXCLUSIONS: civil engineering, landscape architectural, soils engineering, geotechnical services, hazardous waste or toxic substances engineering or other SERVICES.]
1.3 Additional Services. Consultant shall perform the following Additional Services for the Project: N/A
1.4 Communication with City. Consultant shall participate in consultations and conferences with authorized representatives of City and/or other local, regional, or state agencies concerned with the Project, which may be necessary for the completion of the Project or the development of the drawings, specifications and documents in accordance with the applicable standards and requirements of law and the City. Such consultations and conferences shall continue throughout the planning and construction of the Project and the contractor’s warranty period. Consultant shall take direction only from the City’s Representative, or any other representative specifically designated by the City for this Project, including any construction manager hired by the City.
1.5 Coordination and Cooperation with Construction Manager. The City may hire a construction manager to administer and coordinate all or any part of the Project on its behalf. If the City does so, it shall provide a copy of its agreement with the construction manager so that the Consultant will be fully aware of the duties and responsibilities of the construction manage r.
The Consultant shall cooperate with the construction manager and respond to any requests or directives authorized by the City to be made or given by the construction manager. The Consultant shall request clarification from the City in writing if the Consultant should have any questions regarding the authority of the construction manager.
2. INITIAL PLANNING PHASE.
During the initial planning phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
2.1 Project Feasibility. Provide advice and assistance to City in determining the feasibility of the Project, analysis of the type and quality of materials and construction to be selected, the site location, and other initial planning matters.
2.2 Meeting Budget and Project Goals. Consultant shall notify City in writing of potential complications, cost overruns, unusual conditions, and general needs that potentially impact the Project budget and time line, including the City’s Preliminary Construction Budget.
Consultant shall use its best judgment in determining the balance between the size, type and 454
46700.00100\40935196.1
BB&K (2024) Exhibit A-2
quality of construction to achieve a satisfactory solution within the Project’s budget and construction allowance. It shall be the duty of the Consultant to design the Project within budget.
As discussed herein, including in Section 7.3, if the lowest responsive and responsible bid for the Project exceeds the budget by the stated amount, Consultant may be required to make the necessary changes in the drawing and specificat ions, at its sole cost and expense, to bring the bids within the required budget.
2.3 Permits, Approvals and Authorizations. As indicated in Section 3.5.4 of the Agreement, Consultant shall assist City in securing easements, encroachment permits, rights of way, dedications, infrastructures and road improvements, as well as coordinating with utilities and adjacent property owners.
3. SCHEMATIC PLAN PHASE.
During the schematic plan phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
3.1 Funding Documents. Consultant shall provide a site plan and all other Project - related information necessary and required for an application by City to any federal, state, regional, or local agencies for funds to finance the construction Project.
3.2 Schematic Plans. In cooperation with City, Consultant shall prepare preliminary plans and studies, schematic drawings, site utilization plans, and phasing plans showing the scale and relationship of the components of the Project, the plot plan development at the site, and the proposed architectural concept of the buildings (“Schematic Plans”). Consultant shall incorporate the functional requirements of City into the Schematic Plans. The Schematic Plans shall meet all laws, rules and regulations of the State of California. The Schematic Plans shall show all rooms incorporated in each building of the Project in single-line drawings, and shall include all revisions required by City or by any federal, state, regional or local agency having jur isdiction over the Project. All architectural drawings for the Project shall be in a form suitable for reproduction.
3.3 Preliminary Project Budget. Consultant shall use the City’s Preliminary Construction Budget and its own expertise and experience with the Project to establish a preliminary project budget or allowance in a format required by City (“ Consultant’s Preliminary Project Budget”). The purpose of the Consultant’s Preliminary Project Budget is to show the probable Project cost in relation to City’s Preliminary Construction Budget and the construction standards of any applicable funding agency. If Consultant perceives site considerations which render t he Project expensive or cost prohibitive, Consultant shall disclose such conditions in writing to City immediately. As discussed herein, including in Section 7.3, if the lowest responsive and responsible bid for the Project exceeds the budget by more than the stated amount, Consultant may be required to make the necessary changes in the drawings and specifications, at its sole cost and expense, to bring the bids within the required budget Consultant shall provide a preliminary written time schedule for the performance of all construction work on the Project.
3.4 Copies of Schematic Plans and Other Documents. Consultant , at its own expense, shall provide a complete set of the Schematic Plans described herein for City’s review and approval. Additionally, at City’s expense, Consultant shall provide such documents as may be required by any federal, state, regional or local agencies concerned with the Project. Any additional copies required by City shall be provided at actual cost to City. 455
46700.00100\40935196.1
BB&K (2024) Exhibit A-3
4. DESIGN DEVELOPMENT PHASE.
During the design development phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
4.1 Design Development Documents. Once City provides Consultant with specific written approval of the Schematic Plans described herein, Consultant shall prepare design development documents consisting of: (1) site and floor plans; (2) elevations; and (3) any other drawings and documents sufficient to fix and describe the types and makeup of materials, as well as the size and character of the Project ’s structural, mechanical and electrical systems, and to outline the Project specifications (“Design Development Documents”). The Design Development Documents shall be prepared in sufficient form to present to the City Council for approval.
4.2 Copies of Design Development and Other Documents. Consultant, at its own expense, shall provide a complete set of the Design Development Documents described herein for City’s review and approval. Additionally, at City’s expense, Consultant shall provide such documents as may be required by any federal, state, regional or local agencies concerned with the Project. Any additional copies required by City shall be provided at actual cost to City.
4.3 Updated Project Budget. Consultant shall use its Preliminary Project Budget and expertise and experience with the Project to establish an updated estimate of probable construction costs, containing detail consistent with the Design Development Documents as set forth herein and containing a breakdown based on types of materials and specifications identified herein (“Consultant’s Updated Project Budget”).
4.4 Timetable. Consultant shall provide a written timetable for full and adequate completion of the Project to City.
4.5 Application for Approvals. Consultant shall assist City in applyin g for and obtaining required approvals from all federal, state, regional or local agencies concerned with the Project. Consultant shall furnish and process all architectural and engineering information required to prepare and process applications to applicable utilities in order to secure priorities and materials, to aid in the construction of the Project and to obtain final Project approval and acceptance by any of the above agencies as may be required.
4.6 Color and Other Aesthetic Issues. Consultant shall provide, for City’s review and approval, a preliminary schedule of all color materials and selections of textures, finishes and other matters involving an aesthetic decision about the Project.
5. FINAL WORKING DRAWINGS AND SPECIFICATIONS.
During the final working drawings and specifications phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
5.1 Final Working Drawings and Specifications. Once City provides Consultant with specific written approval of the Des ign Development Documents described herein, Consultant shall prepare such complete working drawings and specifications as are necessary for developing complete bids and for properly executing the Project work in an efficient and thorough manner (“Final Working Drawings and Specifications”). Such Final Working Drawings and Specifications shall be developed from the Schematic Plans and Design Development Documents approved by City. The Final Working Drawings and Specifications shall set forth in 456
46700.00100\40935196.1
BB&K (2024) Exhibit A-4
detail all o f the following: (1) the Project construction work to be done; (2) the materials, workmanship, finishes, and equipment required for the architectural, structural, mechanical, and electrical systems; and (3) the utility service connection equipment and site work. As indicated in Section 3.9.2 of the Agreement, City may be requested to supply Consultant with the necessary information to determine the proper location of all improvements on and off site, including record drawings (“as-built drawings”) in City’s possession. Consultant will make a good -faith effort to verify the accuracy of such information by means of a thorough interior and exterior visual survey of site conditions. City shall also make a good -faith effort to verify the accuracy of the as -built drawings and provide any supplemental information to Consultant which may not be shown on the as-built drawings.
5.2 Form. The Final Working Drawings and Specifications must be in such form as will enable Consultant and City to secure the required permits and approvals from all federal, state, regional or local agencies concerned with the Project. In addition, the Final Working Drawings and Specifications must be in such form as will enable City to obtain, by competitive bidding, a responsible and responsi ve bid within the applicable budgetary limitations and cost standards. The Final Working Drawings and Specifications shall be clear and legible so that uniform copies may be on standard architectural size paper, properly indexed and numbered, and shall be capable of being clearly copied and assembled in a professional manner by Consultant.
5.3 Approval and Revisions. City shall review, study, and check the Final Working Drawings and Specifications presented to it by Consultant, and request any necessary revisions or obtain any necessary approvals by the City Council, subject to the approval of all federal, state, regional or local agencies concerned with the Project. Consultant shall make all City-requested changes, additions, deletions, and corrections in the Final Working Drawings and Specifications at no additional cost, so long as they are not in conflict with the requirements of public agencies having jurisdiction or prior approval, or inconsistent with earlier City direction or Consultant ’s professional judgment. Consultant shall bring any such conflicts and/or inconsistencies to the attention of City. The Parties agree that Consultant, and not the City, possesses the requisite expertise to determine the constructability of the Final Working Drawings and Specifications.
However, the City reserves the right to conduct one or more constructability review processes with the Final Working Drawings and Specifications, and to hire an independent architect or other consultant to perform such reviews. Any such independent constructability review shall be at City’s expense. Consultant shall make all City -requested changes, additions, deletions, and corrections in the Final Working Drawings and Specifications which may result from any constructability review, at no additional cost to the City, so long as they are not in conflict with the requirements of public agencies having jurisdiction or prior approval, or inconsistent with earlier City direction or Consultant ’s professional judgment. If such changes, additi ons, deletions or corrections are inconsistent with prior City direction, Consultant shall make such alterations and be compensated therefore pursuant to the Additional Services provision of this Agreement.
5.4 Costs of Construction. It is understood by Consultant that should the Final Working Drawings and Specifications be ordered by City, City shall specify the sum of money set aside to cover the total cost of construction of the work, exclusive of Consultant’s fees. Should it become evident that the total construction cost will exceed the specified sum, Consultant shall at once present a statement in writing to the City’s Representative setting forth this fact and giving a full statement of the cost estimates on which the conclusion is based.
5.5 Copies of Final Working Drawings and Specifications and Other Documents.
Consultant, at its own expense, shall provide a complete set of the Final Working Drawings and Specifications described herein for City’s review and approval. Additionally, at City’s expense, 457
46700.00100\40935196.1
BB&K (2024) Exhibit A-5
Consultant shall provide such documents as may be required by any federal, state, regional or local agencies concerned with the Project. Any additional copies required by City shall be provided at actual cost to City.
6. CONSTRUCTION CONTRACT DOCUMENTS.
During the construction contract documents phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
6.1 Bid and Contract Documents. If so required by City, Consultant shall assist City in the completion of all bid and construction documents, including but not limited to, the Notice Inviting Bids, Instructions to Bidders, Contract Bid Forms (including Alternate Bids as requested by City), `Contract, General Conditions, Supplementary General Conditions, Special Conditions, DVBE and other applicable affirmative action documents, Performance Bond, Payment Bond, Escrow Agreement for Security Deposits, and any other certifications and documents required by federal, state and local laws, rules and regulations which may be reasonably required in order to obtain bids responsive to the specifications and drawings. All such documents shall be subject to the approval of City and City’s legal counsel.
6.2 Final Estimate. At the time of delivery of these bid and construction documents, which shall include the Final Working Drawings and Specifications (collectively referred to herein as the “Construction Documents”), Consultant shall provide City with its final estimate of probable construction cost (“Consultant’s Final Estimate”). As discussed herein, including in Section 7.3, it shall be the Consultant’s duty to design the Project within budget.
7. BID PHASE.
During the bid phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
7.1 Reproducible Construction Documents. Once City provides Consultant with specific written approval of the Construction Documents and Consultant ’s Final Estimate, Consultant shall provide to City one set of reproducible Construction Documents.
7.2 Distribution of Contract Documents and Review of Bids. Consultant shall assist City in distributing the Construction Documents to bidders and conducting the opening and review of bids for the Project.
7.3 Over Budget . If the apparent lowest responsive and responsible bid on the Project exceeds the Consultant’s Final Estimate by more than five percent (5%), City may request Consultant to amend, at Consultant’s sole cost and expense, the Final Drawings and Specifications in order to rebid the Project and receive a lowest responsive and responsible bid equal to or less than the Consultant’s Final Estimate. All revisions necessary to bring the lowest responsible and responsive bid within the Consultant ’s Final Estimate, including any omissions, deferrals or alternates, shall be made in consultation with, and subject to the approval of, the City.
8. CONSTRUCTION PHASE.
During the construction phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
458
46700.00100\40935196.1
BB&K (2024) Exhibit A-6
8.1 Observation. The Project Consultant shall observe work executed from the Final Working Drawings and Specifications in person, provided that City may, in its discretion, consent to such observation by another competent representative of Consultant.
8.2 General Administration. Consultant shall provide general administration of the Construction Documents and the work performed by the contractors.
8.3 Pre-Construction Meeting. Consultant shall conduct one o r more pre- construction meetings, as the City determines is needed for the Project, with all interested Parties.
8.4 Site Visits of Contractor’s Work. Consultant shall conduct site visits to observe each contractors’ work for general conformance with the Cons truction Documents and with any approved construction schedules or milestones. Such site visits shall be conducted as often as are necessary and appropriate to the stage of construction, according to the City’s sole discretion, but in no event less than weekly.
8.5 Site Visits of Inspector’s Work. Consultant shall conduct site visits to communicate and observe the activities of the City inspectors. Such site visits shall be conducted as often as is mutually acceptable to Consultant and City. Consultant shall direct the City inspectors and the Project contractors to coordinate the preparation of record drawings indicating dimensions and location of all “as-built” conditions, including but not limited to, underground utility lines.
8.6 Coordination of Subc onsultants. Consultant shall cause all architects, engineers and other consultants, as may be hired by Consultant or City, to observe the work completed under their disciplines as required, and approve and review all test results for general conformance with the Construction Documents.
8.7 Reports. Consultant shall make regular reports as may be required by applicable federal, state or local laws, rules or regulations, as well as the federal, state, regional or local agencies concerned with the Project.
8.8 Construction Meetings; Minutes. Consultant shall attend all construction meetings and provide written reports/minutes to the City after each construction meeting in order to keep City informed of the progress of the work. Such meetings shall occur at a frequency necessary for the progress of the Project work, according to the City’s sole discretion, but no less than weekly.
8.9 Written Reports. Consultant shall make written reports to City as necessary to inform City of problems arising during construction, changes conte mplated as a result of each such problems, and progress of the Project work.
8.10 Written Records. Consultant shall keep accurate written records of the progress and quality of the Project work and the time schedules, and shall advise the contractors and City of any deviations from the time schedule which could delay timely completion of the Project.
8.11 Material and Test Reports. Consultant shall check and process, in a timely manner, all required material and test reports for the Project work. In addition, Consultant shall provide notice of any deficiencies in material or work reflected in such reports, as well as its recommendation for correction of such deficiencies, to the contractors and City. 459
46700.00100\40935196.1
BB&K (2024) Exhibit A-7
8.12 Review and Response to Submissions. Consultant shall review and respond, in a timely manner, to all schedules, submittals, shop drawings, samples, information requests, change requests, and other submissions of the contractor and subcontractors for compliance with, or alterations and additions to, the Construction Documents. Consultant ’s review and response shall be done in such a manner so as to ensure the timely and uninterrupted progress of the Project work.
8.13 Rejection of Work. Consultant shall promptly reject, as discussed with City, work or materials which do not conform to the Construction Documents. Consultant shall immediately notify the City and contractor(s) of such rejections. Consultant shall also have the authority to recommend to the City that additional inspection or testing of the work be performed, whether or not such work is fabricated, installed or completed.
8.14 Substitutions. Consultant shall consult with City, in a timely manner, with regard to substitution of materials, equipment and laboratory reports thereof, prior to the City’s final written approval of such substitutions. Consultant’s consultation shall be done in such a manner so as to ensure the timely and uninterrupted progress of the Project work.
8.15 Revised Documents and Drawings. Consultant shall prepare, at no additional expense to City, all documents and/or drawings made necessary by errors and omissions in the originally approved Construction Documents.
8.16 Change Requests and Material Changes. Consultant shall evaluate and advise City, in a timely manner and in writing, of any change requests and material change(s) which may be requested or necessary in the Project plans and specifications. Co nsultant shall provide the City with its opinion as to whether such change requests should be approved, denied or revised.
If the City has not hired a construction manager or other person to do so, the Consultant shall prepare and execute all change orders and submit them to the City for authorization. If the City has designated a construction manager or other person to prepare all change orders, the Consultant shall review all change orders prepared by such person, execute them and deliver them to the City for authorization if they meet with the Consultant ’s approval, or submit them to the City with recommendations for revision or denial if necessary. Consultant shall not order contractors to make any changes affecting the contract price without approval by City of such a written change order, pursuant to the terms of the Construction Documents. Consultant may order, on its own responsibility and pending City Council approval, changes necessary to meet construction emergencies, if written approval of City’s Representative is first secured.
8.17 Applications for Payment. Consultant shall examine, verify and approve contractor’s applications for payment, and shall issue certificates for payment in amounts approved by the City’s inspector.
8.18 Final Color and Product Selection. Consultant shall coordinate final color and product selection with City’s original design concept.
8.19 Substantial Completion. Consultant shall determine the date of substantial completion, in consultation with the City.
8.20 Punch List. After deter mining that the Project is substantially complete, Consultant shall participate in the inspection of the Project and shall review all remaining deficiencies and minor items needed to be corrected or completed on the Project, including those identified on the punch list prepared by the contractor (“Punch List Items”). Consultant shall notify 460
46700.00100\40935196.1
BB&K (2024) Exhibit A-8
contractor in writing that all Punch List Items must be corrected prior to final acceptance of the Project and final payment. Consultant shall also notify City of all Punch List Items.
8.21 Warranties. Consultant shall review materials assembled by the contractor and subcontractors with regard to all written warranties, guarantees, owners’ manuals, instruction books, diagrams, record “as built” drawings, and any other materials required from the contractors and subcontractors pursuant to the Construction Documents. Consultant shall coordinate and provide these materials to the City.
8.22 Certificate of Completion. Consultant shall participate in any further inspections of the P roject necessary to issue Consultant ’s Certificate of Completion and final certificate for payment.
8.23 Documents for Project Close- Out. Consultant shall cause all other architects, engineers and other consultants, as may be hired by Consultant , to file any and all required documentation with the City or other governmental authorities necessary to close out the Project.
Consultant shall assist the City in obtaining such documentation from all other architects, engineers, or other consultants.
9. AS-BUILT DRAWINGS.
During the as-built drawings phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
9.1 As-Built Drawings and Specifications. Not later than thirty (30) days after substantial completion of the Project, before receipt of final payment, Consultant shall review and forward the Final Working Drawings and Specifications, indicating on them all changes made by change orders or otherwise pursuant to the Construction Documents, as well as all information called for on the specifications, thus producing an “as -built” set of Final Working Drawings and Specifications (“As-Built Drawings and Specifications”). The As-Built Drawings and Specifications shall show, among other things, the location of all concealed pipe, buried conduit runs and other similar elements within the completed Project. Consultant shall personally review and certify that the As-Built Drawings and Specifications are a correct representation of the information supplied to Consultant by any inspec tors and the contractor, and shall obtain certifications from any inspectors and the contractor that the drawings are correct.
9.2 Approval. Once City provides Consultant with specific written approval of the As- Built Drawings and Specifications, Consultant shall forward to City the complete set of original As-Built Drawings and Specifications or a complete set of reproducible duplicate As -Built Drawings and Specifications. The tracing shall be of such quality that clear and legible prints may be made without appreciable and objectionable loss of detail.
9.3 Documents for Final Payment. Prior to the receipt of Consultant’s final payment, Consultant shall forward to City all of the following: (1) one clear and legible set of reproductions of the computations; (2) the original copy of the specifications; (3) the As -Built Drawings and Specifications as required herein; and (4) Consultant’s Certificate of Completion.
10. WARRANTY PERIOD.
During the warranty period phase of the Project, Consultant shall do all of the following, as well as any incidental services thereto:
461
46700.00100\40935196.1
BB&K (2024) Exhibit A-9
10.1 Advice. Consultant shall provide advice to City on apparent deficiencies in the Project during any applicable warranty periods for the Project. 462
46700.00100\40935196.1
BB&K (2024) Exhibit B-1
EXHIBIT “B”
FEE AND PHASING/FUNDING SCHEDULES
1. FEE SCHEDULE.
Consultant will invoice City on a monthly cycle based on the following fee schedule.
Consultant will include with each invoice a detailed progress report that indicates the amount of budget spent on each phase and the total amount spent against the Total Compensati on.
Consultant will inform City regarding any out -of-scope work being performed by Consultant for which Consultant intends to seek compensation from City.
2. PHASING/FUNDING SCHEDULE.
Progress payments towards Total Compensation shall never exceed the foll owing percentages of Total Compensation as of the phase indicated:
Initial Planning Phase: ________ percent (%____)
Schematic Plan Phase: ________ percent (%____)
Design Development Phase: ________ percent (%____) Final Working Drawings & Specifications Phase: ________ percent (%____) Construction Contract Documents Phase: ________ percent (%____) Bid Phase: ________ percent (%____)
Construction Phase: ________ percent (%____)
As-Built Drawings Phase: ________ percent (%____)
Warranty Period Phase: ________ percent (%____)
Note: No Phasing/Funding Schedule is necessary until a project task is issued under the contract
463
46700.00100\40935196.1
BB&K (2024) Exhibit C-1
EXHIBIT “C”
COMPENSATION RATES AND REIMBURSABLE EXPENSES
1. HOURLY COMPENSATION RATES.
2. REIMBURSABLE EXPENSES.
Reimbursable Expenses shall be billed at cost plus 15% and shall include standard reimbursable expenses
3. ADDITIONAL SERVICES.
Additional Services shall be computed at the actual hourly rates listed above.
4. ADDITIONAL CONSULTANTS.
If City requires Consultant to hire consultants to perform any Additional Services, Consultant shall be compensated therefore at the Consultant ’s actual hourly rates plus 15%.
Owner shall have the authority to review and approve the rates of any such consultants. 464
Department: Public Works
Prepared By: Daniel P Beers
Staff Member Presenting: Tito Haes, Executive
Director Public Works
Reviewed By: Andrea Ampig, Bonnie Tam
Approved By:
Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 12
SUBJECT:
A CONSTRUCTION CONTRACT WITH PHILBIN CONSTRUCTION COMPANY FOR
MASS GRADING AND AN AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH SWA GROUP, INC. FOR ONTARIO'S GRAND PARK PROJECT
CITY OF ONTARIO
Agenda Report
October 15, 2024
SECTION:
CONSENT CALENDAR
RECOMMENDATION:
That the City Council take the following actions:
A
.
Authorize the City Manager, or his designee, to complete and execute Construction Contract No. D&C21-005 - Grand Park Phase 1 Rough Grading with Philbin Construction Company, of Laguna Niguel, California, for the mass grading and debris removal at Ontario’s Grand Park in the amount of $4,534,000 plus a 20% contingency of $906,800 for a total not-to-exceed contract amount of $5,440,800, and
B
.
Authorize the City Manager, or his designee, to execute Amendment No. 1 to the Professional Services Agreement with SWA Group, Inc., of Laguna Beach, California, for additional engineering services in the preparation of the design and construction documents for Ontario’s Grand Park Project in the amount of $141,359 for a not-to-exceed amount of $6,114,355; and
C
.
Authorize the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to agreements, assessments, easements, lot line adjustments, reduction of retention accounts, contracts and contract amendments within the authorization limits, and filing a notice of completion at the conclusion of all construction related activities.
THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:
Invest in the City's Infrastructure (Water, Streets, Sewers, Parks, Storm Drains and Public Facilities)
FISCAL IMPACT:
The Fiscal Year 2024-25 Adopted Budget includes appropriations in the Park Impact Fund for Ontario Grand Park- Phase 1. The Construction Contract with $4,534,000 plus a 20% contingency of $906,800 for a total not-to-exceed contract amount of $5,440,800. Amendment No. 1 to the Professional Services Agreement with SWA Group, Inc. is in the amount of $141,359 for a not-to-exceed amount of $6,114,355. The total amount of all recommended actions in an amount 465
not-to-exceed $5,582,159.
BACKGROUND & ANALYSIS:
On December 21, 2021, the City Council approved the conceptual “Grand Park” Master Plan and the Preliminary Park Design for Phase 1. Phase 1 builds upon the framework established in the Conceptual Park Master Plan and is comprised of approximately 130 acres of land and occurs within the eastern portion of Ontario Ranch. This phase is bordered by Grand Park Street to the north, Eucalyptus Avenue to the south, Haven Avenue on the east and Archibald Avenue on the west. This portion of the park contains meadows, trails, and a field for recreational use that also serves as a storm water capture system. Day one core park amenities are proposed in the center of this phase, which include a Market Alley where farmer’s markets, food trucks and community events can be organized.
There are plans for a community barn and farm hub, kids’ corral (a children’s playground), and a 5,000 capacity amphitheater along the central plaza.
On May 21, 2024, the City Council awarded a contract to SWA Group for the design of Ontario’s Grand Park. During the design phase, additional engineering services were needed in the amount of $141,359 for a total contract amount of $6,114,355. Staff recommends awarding Amendment No. 1 to the Professional Service Agreement with SWA for the design and construction documents for Ontario’s Grand Park.
On September 24, 2024, the City solicited proposals for Invitation No. 1845 for the mass grading and debris removal on the Ontario Grand Park. Twelve (12) bids were received. Philbin Construction Company of Laguna Niguel, CA was the apparent low bidder at $4,534,000. Staff reviewed the bid and found it met the bid criteria and standards necessary to perform the work.
Vendor
Location
Amount
Philbin Construction Company
Laguna Niguel, CA
$4,534,000
Southern California Grading, Inc.
Irvine, CA
$4,781,000
Miller Equipment Co., Inc.
Lancaster, CA
$5,500,000
Act 1 Construction
Norco, CA
$6,645,000
Empire Equipment Service, Inc.
Mira Loma, CA
$6,695,655
Sukut Construction, Inc.
Santa Ana, CA
$7,187,775
Lucy Environmental Services
Group
Encino, CA
$7,400,000
Crew, Inc.
Compton, CA
$7,843,000
Doja
Ontario, CA
$9,579,500
Resource Environmental, Inc.
Cerritos, CA
$11,355,000
Gerald Miller Construction, Inc.
Riverside, CA
$12,848,260
Legion Contractors, Inc.
Los Angeles, CA
$12,888,000
Philbin Construction Company, of Laguna Niguel, California, is the apparent low bidder that met all the required specifications with a base cost of $4,534,000. Based on the proposal, credentials, pricing and favorable reference checks, staff recommends awarding Construction Contract D&C21-005 – Great Park Phase 1 Mass Grading to Philbin Construction Company.
Ontario’s Grand Park is scheduled to be operational by Summer of 2027. 466
Ontario Grand Park Rough Grading -1-
S
ECTION 00500 – CONTRACT FOR CONSTRUCTION
This Contract for Construction (“Contract”), No. D&C21-005 Grand Park Phase 1 Rough Grading is made and entered as of ____________, by and between City of Ontario, with its principal place of business at 303 East “B” Street, Ontario, CA 91764, sometimes hereinafter called the “City” and Philbin Construction Company, sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:
ARTICLE 1. SCOPE OF WORK.
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project:
Ontario Grand Park Rough Grading
Contractor is an independent contractor and not an agent of the City. The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION.
Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within 182 calendar days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE.
The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of Four Million Five Hundred Thirty -Four Thousand Dollars ($4,534,000). Payment shall be made as set forth in the General Conditions . The City will pay to Contractor compensation based upon the prices set forth in the Bid Schedule. 467
Ontario Grand Park Rough Grading -2- SECTION 00500 – CONTRACT FOR
CONSTRUCTION
ARTICLE 4. LIQUIDATED DAMAGES.
Contractor acknowledges that the City will sustain actual damages for each and every Day completion of the Project is delayed beyond the Contract Time. Because of the nature of the Project, it would be impracticable or extremely difficult to determine the City’s actual damages.
Accordingly, in accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum of $500 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Section does not exclude recovery of other damages specified in the Contract Documents. Liquidated damages may be deducted from progress payments due Contractor, Project retention or may be collected directly from Contractor, or from Contractor's surety. These provisions for liquidated damages shall not prevent the City, in case of Contractor's default, from terminating the Contractor.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.
The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid Acknowledgement
Bid Schedule
Bid Guarantee
Designation of Subcontractors
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised Reference Specifications
Approved and fully executed Change Orders
Permits
Scope of Work Summary
Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents. 468
Ontario Grand Park Rough Grading -3- SECTION 00500 – CONTRACT FOR
CONSTRUCTION
All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. In the event of conflict, the various Contract Documents will be given effect in the order set forth in the General Conditions. This Contract shall supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Cont ract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.
ARTICLE 7. INDEMNIFICATION.
Contractor shall provide indemnification and defense as set forth in the General Conditions.
ARTICLE 8. PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at the City’s Office or may be obtained online at http://www.dir.ca.gov and which must be posted at the job site.
ARTICLE 9. FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False Claims Act, California Government Code sections 12650, et seq., provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include within their scope false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. In the event the City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’ fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an administrative debarment proceeding wherein Contractor may be prevented from further bidding on public contracts for a period of up to five (5) years. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
469
Ontario Grand Park Rough Grading -4- SECTION 00500 – CONTRACT FOR
CONSTRUCTION
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.
CITY OF ONTARIO
By:
Scott Ochoa
City Manager
ATTEST:
By:
Sheila Mautz, City Clerk
APPROVED AS TO FORM:
By:
Best Best & Krieger LLP
City Attorney
Philbin Construction Company
By:
Its:
Printed Name:
[DELETE THE FOLLOWING SIGNATURE
LINE IF NOT REQUIRED]
By:
Its:
Printed Name:
____________________________________
Contractor’s License Number and
Classification
____________________________________
DIR Registration Number
[IF CORPORATION, TWO SIGNATURES,
PRESIDENT OR VICE PRESIDENT AND
SECRETARY OR TREASURER
REQUIRED]
END OF CONTRACT
470
Ontario Grand Park Rough Grading -5- SECTION 00500 – CONTRACT FOR
CONSTRUCTION
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
471
Ontario Grand Park Rough Grading -6- SECTION 00610 – BOND FORMS
SECTION 00610 – BOND FORMS
Performance Bond
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the City of Ontario, with its principal place of business at 303 East “B” Street, Ontario, CA 91764, (hereinafter referred to as the “City”) has awarded to Philbin Construction Company, (hereinafter referred to as the “C ontractor”) an agreement for Contract No. D&C21- 005 Grand Park Phase 1 Rough Grading, (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, __ ____________________, the undersigned Contractor and ________________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of Four Million Five Hundred Thirty -Four Thousand DOLLARS, ($4,534,000), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor , his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee of all materials and workmanship; and shall indemnify and save harmless the City , its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the C ontract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by the City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship.
The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.
472
Ontario Grand Park Rough Grading -7- SECTION 00610 – BOND FORMS
Whenever Contractor shall be, and is declared by the City t o be, in default under the C ontract Documents, the Surety shall remedy the default pursuant to the Contract Documents , or shall promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of t he contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount prev iously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
473
Ontario Grand Park Rough Grading -8- SECTION 00610 – BOND FORMS
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fac t Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium charges is $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________ Representative for service of ___________________________________________ process in California, if different ___________________________________________ from above)
(Telephone number of Surety ___________________________________________ and Agent or Representative for
service of process in California)
474
Ontario Grand Park Rough Grading -9- SECTION 00610 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
475
Ontario Grand Park Rough Grading -10- SECTION 00610 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to local representatives of the bonding company must also be attached.
END OF PERFORMANCE BOND
476
Ontario Grand Park Rough Grading -11- SECTION 00610 – BOND FORMS
Payment Bond (Labor and Materials).
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Ontario , with its principal place of business at 303 East “B” Street, Ontario, CA 91764 (hereinafter designated as the “ City”), by action taken or a resolution passed ___________________ , 20_____ , has awarded to Philbin Construction Company hereinafter designated as the “Principal,” a contract for the work described as follows: Contract No. D&C21- 005 Grand Park Phase 1 Rough Grading (the “Project”); and WHEREAS, the work to be performed by the Contractor is more p articularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of 477
Ontario Grand Park Rough Grading -12- SECTION 00610 – BOND FORMS
any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or the City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Civil Code Section 9100, and has not been paid the full amount of his claim.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract to be performed thereunder, shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of Contract, including but not limited to, the provisions of Sections 2819 and 2845 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fac t Certificate) Title
478
Ontario Grand Park Rough Grading -13- SECTION 00610 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/s he/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal. 479
Ontario Grand Park Rough Grading -14- SECTION 00610 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.
END OF PAYMENT BOND
480
Ontario Grand Park Rough Grading -15- SECTION 00700 – GENERAL CONDITIONS
SECTION 00700 – GENERAL CONDITIONS
ARTICLE 1 -TERMS; DEFINITIONS
1.1 Defined Terms
A. Whenever used in the Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined below, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.
1. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or a tidal wave.
2. A ddenda -- Written or graphic instruments issued prior to the submission of Bids which clarify, correct, or change the Contract Documents.
3. A dditional Work -- New or unforeseen work will be classified as “Additional Work” when the Engineer determines that it is not covered by the Contract.
4. A pplicable Laws -- The laws, statutes, ordinances, rules, codes, regulations, permits, and licenses of any kind, issued by local, state or federal governmental authorities or private authorities with jurisdiction (including utilities), to the extent they apply to the Work.
5. Architect means the architect, engineer, or other design professional engaged by the City to design and perform general observation of the work of construction and interpret the Drawings and Specifications for the Project.
6. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices and other terms for the Work to be performed.
7. B id Guarantee -- The Bid Bond, cashier’s check, or certified check to be made by the Bidder, which is to accompany the Bid as a guaranty of good faith to enter into a written contract.
8. B idder -- The individual or entity who submits a Bid directly to the City.
9. Change Order (“CO”) -- A document that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Contract, in accordance with the Contract Documents and in the form contained in the Contract Documents.
10. C hange Order Request (“COR”) -- A request made by the Contractor for an adjustment in the Contract Price and/or Contract Times as the result of a Contractor-claimed change to the Work.
11. Cit
y’s Representative – The City of Ontario, and acting through properly authorized agents, such as the Construction Manager, Engineer or such other agents acting within the scope of the particular duties entrusted to them. Also sometimes 481
Ontario Grand Park Rough Grading -16- SECTION 00700 – GENERAL CONDITIONS
referred to as the “ City’s Representative” or “Representative” in the Contract Documents. The terms the City and Owner may be used interchangeably
12. Claim -- A demand or assertion by the City or Contractor seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim.
13. Construction Manager. The Construction Manager (CM) is a consultant to the City contracted to assist in Project planning, management and construction of the Project. If there is a Construction Manager, they may assist in various aspects of the Project including, but not limited to submittal review / submittal coordination, monitoring the progress of the construction, reviewing and monitoring the schedule, progress of work, monitoring pay requests, facilitating communications, advising the City and its Board on various aspects of the construction process, monitoring the RFI, COR, CCD, ICD, RFP, Claims, Disputes and other Project related processes. All communications regarding the Project shall be done through the CM and any communications related to the Project shall copy the CM.
The CM is not responsible for Contractor’s means and methods for safety and/or their construction process for the Work.
14. Contract -- The entire integrated written agreement between the City and Contractor concerning the Work. “Contract” may be used interchangeably with “Agreement” in the Contract Documents. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral, and includes all Contract Documents.
15. C
ontract Documents -- The documents listed in Section 00 52 13, Article 5 of the Contract for Construction. Some documents provided by the City to the Bidders and Contractor, including but not limited to reports and drawings of subsurface and physical conditions are not Contract Documents.
16. C ontract Price -- Amount to be paid by the City to the Contractor as full compensation for the performance of the Contract and completion of the Work, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs.
17. C
ontract Time -- The number of days or the dates stated in the Contract Documents to: achieve defined milestones, if any; and to complete the Work so that it is ready for final payment.
18. C ontractor -- The individual or entity with which the City has contracted for performance of the Work.
19. C ontractor’s Designated On-Site Representative -- The Contractor’s Designated On-Site Representative will be identified by the Contractor and shall not be changed without prior written consent of the City.
20. C ritical Supply Shortage -- An unusual shortage in materials that is (a) supported by documented proof that Contractor made every effort to obtain such materials from all available sources; (b) such shortage is due to the fact that such materials are not physically available from single or multiple sources or could have been 482
Ontario Grand Park Rough Grading -17- SECTION 00700 – GENERAL CONDITIONS
obtained only at exorbitant prices entirely inconsistent with current and standard rates taking into account the quantities involved and the usual industry practices in obtaining such quantities; and (c) such shortages and the difficulties in obtaining alternate sources of materials could not have been known or anticipated by Contractor at the time it submitted its bid or entered the Contract. Market fluctuations in prices of materials, whether or not resulting from a Force Majeure Event, does not constitute a Critical Supply Shortage.
21. Day -- A calendar day of 24 hours measured from midnight to the next midnight.
22. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard, test, or approval referenced in the Contract Documents.
23. De
mobilization -- The complete dismantling and removal by the Contractor of all of the Contractor’s temporary facilities, equipment, and personnel at the Site.
24. Dr awings -- That part of the Contract Documents prepared by of the Engineer of Record which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not Drawings as so defined.
25. E ffec tive Date of the Contract -- The date indicated in the Contract on which it becomes effective, but if no such date is indicated, it means the date on which the Contract is signed and delivered by the last of the two parties to sign and deliver.
26. E
ngineer -- Whenever not qualified, shall mean the City Engineer or the Engineer authorized to act for and in behalf of the City, acting either directly or through properly authorized agents, such agents acting severally within the scope of the particular duties entrusted to them.
27. For
ce Majeure Event -- An event that materially affects a party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and other organized labor action occurring at the Site and the effects thereof on the Work, only to the extent such strikes and other organized labor action are beyond the control of Contractor and its Subcontractors, of every Tier, and to the extent the effects thereof cannot be avoided by use of replacement workers; and (6) a Critical Supply Shortage. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of the City in its capacity as a municipal authority.
28. H
azardous Waste -- The term “Hazardous Waste” shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended from time to time, or any substance or material identified as hazardous under any 483
Ontario Grand Park Rough Grading -18- SECTION 00700 – GENERAL CONDITIONS
state or federal statute governing handling, disposal and/or cleanup of any such substance or material, whichever is more restrictive.
29. Holiday – City recognized holidays. These are not necessarily project recognized holidays. Refer to Section 00750-Special Conditions for listed recognized project holidays:
New Year’s Day - January 1
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day - December 25
Day After Christmas – December 26
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday are both Holidays.
30. Notice of Award -- The written notice by the City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, the City will sign and deliver the Contract.
31. N
otice of Completion -- The form which may be executed by the City constituting final acceptance of the Project.
32. N otice to Proceed -- A written notice given by the City to Contractor fixing the date on which the Contractor may proceed with the Work and when Contract Times will commence to run.
33. P
roject -- The total construction of which the Work to be performed under the Contract Documents may be the whole, or a part.
34. R ecord Drawings – The record set of as-builts prepared by the Contractor during the Work in accordance with the requirements of the General Conditions.
35. R ecyclable Waste Materials -- Materials removed from the Site which are required to be diverted to a recycling center rather than an area landfill. Recyclable Waste Materials include, but are not limited to, asphalt, concrete, brick, concrete block, and rock.
36. S
ample -- A physical example furnished by the Contractor to illustrate materials, equipment or workmanship; to establish standards by which the Work will be judged.
484
Ontario Grand Park Rough Grading -19- SECTION 00700 – GENERAL CONDITIONS
37. Schedule also known as the “Project Construction Schedule” is a practical way in which the Work will be accomplished. The Project Construction Schedule will be developed and managed by the Construction Manager. Refer to A rticle 8 of the General Conditions, 00750 – Special Conditions, and Division 01 – General Requirements.
38. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to facilitate scheduled performance of related construction activities.
39. S hop Drawings -- All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.
40. S ite -- Lands or areas indicated in the Contract Documents as being furnished by the City upon which the Work is to be performed, including rights -of-way and easements for access thereto, and such other lands furnished by the City which are designated for the use of Contractor.
41. S pecifications -- That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto.
42. S
top Payment Notice -- A written notice as defined in Civil Code section 8044.
43. Subcontractor -- An individual or entity other than a Contractor having a contract with any other entity than the City for performance of any portion of the Work at the Site.
44. S ubmittal -- Written and graphic information and physical samples prepared and supplied by the Contractor demonstrating various portions of the Work.
45. Substantial Completion/ Substantially Complete(d) is not reached unless and until each of the following four (4) conditions have been met: (1) all contractually required items have been installed with the exception of only minor and Incomplete Punch List Items; (2) All Fire/Life Safety Systems have been installed, and are working and signed off, and all building systems including mechanical, electrical and plumbing are all functioning; (3) all other City Inspection Card for the Project have been approved and signed off; and (4) the Project is fit for occupancy and its intended use. For the purposes of this Contract, any references to the Completion Date means the Substantial Completion Date
46. Successful Bidder -- The responsible Bidder submitting a responsive Bid to whom the City makes an award.
47. S upplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment used in the performance of the Work or to be incorporated in the Work.
485
Ontario Grand Park Rough Grading -20- SECTION 00700 – GENERAL CONDITIONS
48. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.
49. Un it Price Work -- Work to be paid for on the basis of unit prices as provided by the Contractor in its Bid or as adjusted in accordance with the Contract Documents.
50. W arranty -- A guarantee provided to the City by the Contractor that the Work will remain free of defects and suitable for its intended use for the period required by the Contract Documents or the longest period permitted by the law of this s tate, whichever is longer.
51. W
ork -- The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.
1.1 Ter minology.
A. The words and terms below are not defined but, when used in the Contract Documents, have the indicated meaning.
1. The word “furnish,” when used in connection with services, materials, or equipment, shall mean to supply and deliver said services, materials, or equipment to the S ite (or some other specified location) ready for use or installation and in usable or operable condition.
2. The word “install,” when used in connection with services, materials, or equipment, shall mean to put into use or place in final position said services, materials, or equipment complete and ready for intended use.
3. The words “perform” or “provide,” when used in connec tion with services, materials, or equipment, shall mean to furnish and install said services, materials, or equipment complete and ready for intended use.
4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in connection with services, materials, or equipment, an obligation of Contractor is implied.
B. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. 486
Ontario Grand Park Rough Grading -21- SECTION 00700 – GENERAL CONDITIONS
ARTICLE 2 -PRELIMINARY MATTERS
2.1 Delivery of Contract Documents
A. Within ten (10) Days after receipt of the Notice of Award and before the City will execute the Contract, the Contractor shall furnish and file with the City a signed Contract and the necessary Performance Bond, Payment Bond, and Certificates of Insurance and Endorsements, as well as any other documents specified in the Contract Documents.
2.2 Bonds
A. Contractor shall submit the bonds on the forms provided with the Contract Documents, duly executed by a responsible corporate surety admitted to transact surety business in the State of California, as defined in Code of Civil Procedure section 995.120, and listed in the United States Department of the Treasury circular entitled "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies," authorized to do business in the State of California and acceptable to the City conditioned upon the faithful performance by the Contractor of all requirements of the Contract Documents. Each of the bonds shall be in a sum no less than one hundred percent (100%) of the Contract Price. Bonds shall be delivered to the City within ten (10) Days after receipt of the Notice of Award and before execution of the Contract by the City.
2.3 Evidence of Insurance
A. Prior to commencing any W ork but no later than ten (10) Days after receipt of the Notice of Award, the Contractor shall submit or cause to be submitted any and all Certificates of Insurance and Endorsements, showing that the Contractor has the required insurance, to the attention of the City. Such insurance is to be provided at the sole cost and expense of the Contractor. No Work shall be performed until all of the required insurance has been received and approved.
2.4 Execution of the Contract
A. Upon receipt of the required Contract Documents, the City will execute the Contract, establishing the Effective Date of the Contract.
2.5 Contractor’s Failure to Perform
A. Should Contractor fail to comply with timelines provided above, the City shall retain the right to enforce and collect on the Contractor’s Bid Guarantee, rescind award to the Contractor and award the Contract to the next lowest responsive, re sponsible bidder as determined by the City. If the City elects to accept bonds and insurance submitted late, the Contract Times will begin to run as of the date stated in the Notice to Proceed. However, the number of days beyond the original ten (10) Days it took to receive the properly executed Contract and related items may be deducted from the Contract Times.
487
Ontario Grand Park Rough Grading -22- SECTION 00700 – GENERAL CONDITIONS
2.6 Commencement of Contract Times; Notice to Proceed
A. The City will not issue a Notice to Proceed until after the Effective Date of the Contract.
Work shall commence within ten (10) Days of the date stated in the Notice to Proceed.
The Contract Times begin to run on the date specified in the Notice to Proceed. No Work shall be done at the Site prior to the issuance of the Notice to Proceed.
2.7 Copies of Documents
A. C ontractor shall maintain a clean, undamaged set of Contract Documents, including Submittals, at the Project site.
2.8 Substitution Requests, Schedule of Submittals, and Schedule A. Substitution Requests. Within thirty -five (35) days of Contract award (unless otherwise specified in the Contract Documents), Contractor shall provide all substitution requests as further described in the General Conditions.
B. S chedule of Submittals. Within five (5) Days after the issuance of the Notice of Proceed (unless otherwise specified in the Contract Documents) , Contractor shall submit to the City a Schedule of Submittals that conforms with the requirements of Section 00 72 00, Article 5.21.
C. S chedule. Within ten (10) days after the issuance of the Notice of Proceed (unless otherwise specified in the Contract Documents) , the Contractor shall submit man- power for each activity noted in the construction schedule.
2.9 P reconstruction Conference; Designation of Authorized Representatives.
A. Before any Work at the Site is started, a conference attended by the City , Construction Manager, Contractor, Engineer, and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to herein, procedures for handling Submittals and Shop Drawings, processing a pplications for p ayment, and maintaining required records.
B. At this conference the City , Construction Manager, and Contractor each shall designate, in writing, a specific individual to act as its authorized representative with respect to the services and responsibilities under the Contract. Such individuals shall have the authority to transmit instructions, receive information, render decisions relative to the Contract, and otherwise act on behalf of each respective party.
2.10 Subcontractor Mobilization Meeting.
A. Prior to the start of each major Subcontractor’s Site Work, the Contractor, the involved Subcontractor, Construction Manager, and Engineer shall attend a pre-start meeting to discuss the schedule, coordination, procedures, and other administrative issues.
488
Ontario Grand Park Rough Grading -23- SECTION 00700 – GENERAL CONDITIONS
2.11 Authority of Council; Engineer
A. The City Council has the final authority in all matters affecting the Work. Within the scope of the Contract, the Engineer has the authority to enforce compliance with the Contract Documents. The Contractor shall promptly comply with instructions from the Engineer.
B. The decision of the Architect / Engineer is final and binding on all questions relating to:
1. quantities;
2. acceptability of material, equipment, or work;
3. execution, progress or sequence of work;
4. i nterpretation of the Plans, Specifications, or other Contract Documents; and
5. Any other areas specifically identified in the Contract Documents or under the law.
C. C ompliance with instructions from t he Architect / Engineer shall be a condition precedent to any payment under the Contract, unless otherwise ordered by the City Council.
2.12 Mobilization
A. When a Bid item is included in the Bid Schedule for mobilization, the costs of Work in advance of construction operations and not directly attributable to any specific bid item will be in cluded in the progress estimate. When no bid item is provided for mobilization payment for such costs will be deemed to be included in the other items of the Work.
B. Payment for mobilization based on the lump sum provided in the Bid Schedule, shall constitute full compensation for all such Work. No payment for mobilization will be made until all of the listed items have been completed to the satisfaction of the Engineer. The scope of the Work included under mobilization shall include, but shall not be limited to, the following principal items:
19. Obtaining and paying for all bonds, insurance, and permits.
20. Moving on to the Project Site of all Contractor’s plant and equipment required for the first month’s operations.
21. Installing temporary construction power, wiring, and lighting facilities, as applicable.
22. Establishing fire protection system, as applicable.
23. Developing and installing a construction water supply, as applicable. 489
Ontario Grand Park Rough Grading -24- SECTION 00700 – GENERAL CONDITIONS
24. Providing and maintaining the field office trailers for the Contractor, if necessary, and the Engineer (if specified), complete, with all specified furnishings and utility services.
25. Providing on-site sanitary facilities and potable water facilities as specified per Cal- OSHA and these Contract Documents.
26. Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work. All such storage shall meet manufacturer’s specified storage requirements, and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security.
27. Arranging for and erection of Contractor’s work and storage yard.
28. Posting all OSHA required notices and establishment of safety programs per Cal- OSHA.
29. Full-time presence of Contractor’s superintendent at the job S ite as required herein.
30. Submittal of construction schedule as required by the Contract Documents.
ARTICLE 3 -CONTRACT DOCUMENTS; INTENT
3.1 Examination of Drawings, Specifications, and Site of Work A. Examination of Contract Documents ; Site. Before commencing any portion of the Work, Contractor shall again carefully examine all applicable Contract Documents, the Project Site, and other information given to Contractor as to materials and methods of construction and other Project requirements. Contractor shall immediately notify the Architect / Engineer through the Construction Manager of any potential error, inconsistency, ambiguity, conflict, or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any Subcontractor proceed with Work if uncertain as to the applicable requirements.
B. A
dditional Instructions. After notification of any error, inconsistency, ambiguity, conflict, or lack of detail or explanation, the Engineer will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work.
C. Q
uality of Parts, Construction and Finish. All parts of the Work shall be of the best quality of their respective kinds and the Contractor must use all diligence to inform itself fully as to the required construction and finish.
D. C ontractor’s Variation from Contract Document Requirements. If it is found that the Contractor has varied from the requirements of the Contract Documents including 490
Ontario Grand Park Rough Grading -25- SECTION 00700 – GENERAL CONDITIONS
the requirement to comply with all A pplicable Laws, the Engineer may at any time, before or after completion of the Work, order the improper Work removed, remade or replaced by the Contractor at the Contractor’s expense.
3.2 Intent of Contract Documents
A. The Contract Documents are complementary; what is required by any one will be binding as if required by all. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to the City.
B. The Contractor shall furnish, unless otherwise provided in the Contract Documents, all m aterials, implements, machinery, equipment, tools, supplies and labor necessary to the prosecution and completion of the Project.
C. Clarifications and interpretations of the Contract Documents shall be issued by the Engineer as provided in these General Conditions.
D. If utilities to equipment/fixtures are not shown but are necessary to operate the equipment/fixtures, the utilities service installation is considered to be part of the Work. The implied Work will conform to the appropriate sections of the Contrac t Documents.
E. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing Work among Subcontractors or in establishing the extent of Work to be performed by any trade.
3.3 Reference Standards.
A. Standards, Specifications, Codes, Laws, and Regulations.
1. Reference to f ederal specifications, federal standards, other standards, specifications, manuals, or codes of any technical society, organization, or association, or to Applicable Laws, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Applicable Laws in effect at the time of opening of Bids (or on the Effective Date of the Contract if there were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of the City , Contractor, o r any of their Subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to the City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents.
491
Ontario Grand Park Rough Grading -26- SECTION 00700 – GENERAL CONDITIONS
3.4 Reporting and Resolving Discrepancies; Order of Precedence.
A. Reporting Discrepancies.
1. The Contract Documents are intended to be fully cooperative and complementary.
Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. Contractor shall promptly report in writing to the City any conflict, error, ambiguity, or discrepancy which Contractor discovers, should have discovered, or has actual knowledge of, and shall obtain a written interpretation or clarification from the City before proceeding with any Work affected thereby. If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (i) any Applicable Law, (ii) any standard, specification, manual, or code, or (iii) any instruction of any Supplier, then Contractor shall promptly submit a written Request for Information (RFI) to the City.
Contractor shall not proceed with the Work affected thereby (except in an emergency) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in the Contract Documents, and any Work performed by Contractor before receipt of an amendment or supplement shall be at Contractor’s own risk.
2. REQUEST FOR INFORMATION (“RFI”)
a. Definition
A RFI is a written request prepared by the Contractor requesting the Architect to provide additional information necessary to clarify or amplify an item which the Contractor believes is not clearly shown or called for in the Drawings or Specifications, or to address problems which have arisen under field conditions.
i. A RFI shall not be used as a vehicle to generate time extensions. ii. Resubmission of the same or similar RFI is not acceptable. RFI’s that are similar should be addressed in Project meetings where the reques tor (Contractor, Subcontractor or vendor) is able to address the particular issue with the Architect or Engineer and a resolution addressed in the minutes.
iii. A RFI response applicable to a specific area cannot be extended to other situations unless specifically addressed in writing within the RFI or in a separate RFI.
iv. RFI’s should provide a proposed solution and should adequately describe the problem that has arisen.
b. Scope
The RFI shall reference all the applicable Contract Documents including Specification section, detail, page numbers, Drawing numbers, and sheet 492
Ontario Grand Park Rough Grading -27- SECTION 00700 – GENERAL CONDITIONS
numbers, etc. The Contractor shall make suggestions and interpretations of the issue raised by the RFI. An RFI cannot modify the Contract Cost, Contract Time, or the Contract Documents.
c. Response Time
The Architect must respond to a RFI within a reasonable time after receiving such request. If the Architect’s response results in a change in the Work, then such change shall be effected by a written CO, COR RFP or ICD, if appropriate.
If the Architect cannot respond to the RFI within a reasonable time, the Architect shall notify the CM and Contractor, with a copy to the City, of the amount of time that will be required to respond.
d. Cost Incurred
The Contractor shall be responsible for any costs incurred for professional services, which shall be subject to a Deductive Change Order, if an RFI requests an interpretation or decision of a matter where the information sought is equally available to the party making such request. City, at its sole discretion, shall issue a Deductive Change Order to Contractor for all such professional services arising from this Article
B. Order of Precedence.
1. In case of conflicts between the Contract Documents, the order of precedence shall be as follows:
a. Permits from other agencies as may be required by law b. Change Orders, most recent first
c. Contract
d. Addenda, most recent first
e. Special Conditions
f. Specifications
g. Construction Plans and Drawings(Contract Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Contractor’s Bid (Bid Forms)
l. Standard Specifications for Public Works Construction “Greenbook” latest edition (Sections 1-9 Excluded)
493
Ontario Grand Park Rough Grading -28- SECTION 00700 – GENERAL CONDITIONS
m. Applicable Local Agency Standards and Specifications n. Standard Drawings
o. Reference Documents
2. With reference to the Drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Contract Drawings govern over Standard Drawings
e. Contract Drawings govern over Shop Drawings
3. Notwithstanding the orders of precedence established above, in the event of conflicts, the higher standard, higher quality and most expensive shall always apply.
3.5 Amending and Supplementing Contract Documents.
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof only by Change Order or written amendment to the Contract duly executed by the parties.
B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized at no cost to the City, by one or more of the following ways:
1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request without exception (subject to the provisions of the Contract Documents); or
2. The City’s issuance of a response to an RFI.
C. However, no review or RFI response will reduce or modify the Contractor’s obligation to fully satisfy and comply with the requirements of the Contract Documents.
3.6 Reuse of Documents.
A. Contractor and any Subcontractor or Supplier shall not:
1. have or acquire any title to or o wnership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer of Record or its consultants, including electronic media editions; or
2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of the City and Engineer of Record and specific written verification or adaptation by Engineer of Record.
494
Ontario Grand Park Rough Grading -29- SECTION 00700 – GENERAL CONDITIONS
B. The prohibitions of this Article will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes.
ARTICLE 4 -INDEMNIFICATION; INSURANCE
4.1 Indemnification
A. To the fullest extent permitted by law, Contractor shall immediately defend (with counsel of the City’s choosing), indemnify and hold harmless the City, Construction Manager, Architect, Engineer , its officials, officers, agents, employees, and representatives, and each of them from and against:
1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited to, injury to or death, including wrongful death, of any person, and damages to or destruction of property of any person, arising out of, related to, or in any manner directly or indirectly connected with the Work or this Contract, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses, however caused, regardless of whether the allegations are false, fraudulent, or groundless, and regardless of any negligence of the City , Construction Manager, Architect, Engineer or its officers, employees, or authorized volunteers (including passive negligence), except the sole negligence or wi llful misconduct or active negligence of the City, Construction Manager, Architect, Engineer, or its officials, officers, employees, or authorized volunteers.
2. Contractor’s defense and indemnity obligation herein includes, but is not limited to damages, fines, penalties, attorney’s fees and costs arising from claims under the Americans with Disabilities Act (ADA) or other federal or state disability access or discrimination laws arising from Contractor’s Work during the course of construction of the improvements or after the Work is complete, as the result of defects or negligence in Contractor’s construction of the improvements.
3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or liabilities, in law or equity, of every kind or nature whatsoever, arising out of, resulting from, or on account of the violation of any governmental law or regulation, compliance with which is the responsibility of Contractor;
4. Any and all losses, expenses, damages (including damages to the Work itself), attorney’s fees, and other costs, including all costs of defense which any of them may incur with respect to the failure, neglect, or refusal of Contractor to faithfully perform the Work and all of Contractor’s obligations under Contract . Such costs, expenses, and damages shall include all costs, including attorney’s fees, incurred by the indemnified parties in any lawsuit to which they are a party.
B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk, with the counsel of the City choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against the City, Construction Manager, Architect, Engineer, its officials, officers, agents, employees and representatives. Contractor shall pay and satisfy any judgment, 495
Ontario Grand Park Rough Grading -30- SECTION 00700 – GENERAL CONDITIONS
award or decree that may be rendered against the City , Construction Manager, Architect, Engineer, its officials, officers, employees, agents, employees and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse the City, Construction Manager, Architect, Engineer, its officials, officers, agents, employees and representatives for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code section 2782.
C. The provisions of this Article shall survive the termination of this Contract howsoever caused, and no payment, partial payment, or acceptance of occupancy in whole or part of the Work shall waive or release any of the provisions of this Article.
4.2 Insurance
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain all of the insurance described in this Article. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required hereunder. Contractor shall not allow any S ubcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this Article. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause. Contractor shall furnish the City with original certificates of insurance and endorsements effective coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms acceptable to the City . All certificates and endorsements must be received and approved by the City before Work commences.
A. Additional Insureds; Waiver of Subrogation. The City, Construction Manager, Architect, Engineer, its officials, officers, employees, agents and authorized volunteers shall be named as Additional Insureds on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies of Commercial General Liability and Automobile Liability insurance using, for Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20 10 and 20 37 (or endorsements providing the exact same coverage, including completed operations), and, for subcontractors’ policies of Commercial General Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same coverage). Notwithstanding the minimum limits set forth in this Contract for any type of insurance coverage, all available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as Additional Insureds hereunder. All insurance coverage maintained or procured pursuant to this Contract shall be endorsed to waive subrogation against the City, Construction Manager, Architect, Engineer, its officers, officials , agents, employees or volunteers or shall specifically allow Contractor - or others providing insurance evidence in compliance with these specifications - to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City, Construction Manager, Architect, Engineer, and shall require similar written express waivers and insurance clauses from each of its subcontractors. Copies of these waivers shall be submitted to the City prior to commencement of work.
496
Ontario Grand Park Rough Grading -31- SECTION 00700 – GENERAL CONDITIONS
B. Workers’ Compensation Insurance . The Contractor shall provide workers’ compensation insurance for all of the employees engaged in Work under this Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall require the subcontractor similarly to provide workers’ compensation insurance for all the latter’s employees as prescribed by State law. A ny class of employee or employees not covered by a subcontractor’s insurance shall be covered by the Contractor’s insurance. In case any class of employees engaged in work under this Contract, on or at the Site, is not protected under the Workers’ Compensation Statutes, the Contractor shall provide or shall cause a subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected. The Contractor is required to secure payment of compensation to his employees in accordance with the provisions of section 3700 of the Labor Code.
The Contractor shall file with the City certificates of his insurance protecting workers.
Company or companies providing insurance coverage shall be acceptable to the City, if in the form and coverage as set forth in the Contract Documents.
C. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability Insurance, including Occupational Disease, in the amount of at least one million dollars ($1,000,000.00) per person per acc ident. Contractor shall provide the City with a certificate of Employer’s Liability Insurance. Such insurance shall comply with the provisions of the Contract Documents. The policy shall be endorsed, if applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and contain a Waiver of Subrogation in favor of the City.
D. Commercial General Liability Insurance. Contractor shall provide “occurrence” form Commercial General Liability insurance coverage at least as broad as the most current ISO CGL Form 00 01, including but not limited to, premises liability, contractual liability, products/completed operations, personal and advertising injury which may arise from or out of Contractor’s operations, use, and management of the Site, or the performance of its obligations hereunder. The policy shall not contain any exclusion contrary to this Contract including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured against another. Policy limits shall not be less than $10,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or othe r form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Defense costs shall be paid in addition to the limits.
19. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess of such coverage, nor shall it limit Contractor’s indemnification obligations to the City, and shall not preclude the City from taking such other actions available to the City under other provisions of the Contract Documents or law.
20. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.
497
Ontario Grand Park Rough Grading -32- SECTION 00700 – GENERAL CONDITIONS
21. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non- owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions relating to liability for injury to or death of persons and damage to property.
22. If the coverage contains one or more aggregate limits, a minimum of 50% of any such aggregate limit must remain available at all times; if over 50% of any aggregate limit has been paid or reserved, the City may require additional coverage to be purchased by Contractor to restore the required limits. Contractor may combine primary, umbrella, and as broad as possible excess liability coverage to achieve the total limits indicated above. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents.
23. All policies of general liability insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.
E. Automobile Liability Insurance. Contractor shall provide Automobile Liability Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least, one million dollars ($5,000,000) per accident for bodily injury and property damage.
Such insurance shall provide coverage with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible, in a form and with insurance companies acceptable to the City. All policies of automobile insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.
F. Builder’s Risk [“All Risk”]
1. The City shall maintain Builder’s Risk, Course of Construction or similar first party property coverage issued on a replacement cost value basis consistent with the total replacement cost of all insurable Work and the existing buildings where Work is being performed for the Project included within the Contract Documents.
Coverage is to insure against risks of accidental direct physical loss. Contractor shall be responsible for the applicable Fifty Thousand Dollar ($50,000) deductible under the City builder’s risk insurance policy for damage to work of Contractor or any Subcontractor of any tier including damage to work of other Contractors caused by Contractor or its Subcontractors.
G. Contractor’s Pollution Liability Coverage . Contractor shall provide pollution liability insurance in an amount not less than $5 ,000,000 per occurrence and $10,000,000 aggregate.
H. Contractor shall require all tiers of Subcontractors working under this Contract to provide the insurance required under this Article unless otherwise agreed to in 498
Ontario Grand Park Rough Grading -33- SECTION 00700 – GENERAL CONDITIONS
writing by the City . Contractor shall make certain that any and all S ubcontractors hired by Contractor are insured in accordance with this Contract. If any Subcontractor’s coverage does not comply with the foregoing provisions, Contractor shall indemnify and hold the City, Construction Manager, Architect, and Engineer harmless from any damage, loss, cost, or expense, including attorneys’ fees, incurred by the City as a result thereof.
I. Notwithstanding the minimum limits set forth in this Contract for any type of insurance coverage, if Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
J. Form and Proof of Carriage of Insurance
19. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall have an A.M. Best rating of not less than an A:VII. Insurance deductibles or self- insured retentions must be declared by the Contractor. At the election of the City the Contractor shall either 1) reduce or eliminate such deductibles or self -insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses. If umbrella or excess liability coverage is used to meet any required limit(s) specified herein, the Contractor shall provide a “follow form” endorsement satisfactory to the City indicating that such coverage is subject to the same terms and conditions as the underlying liability policy.
20. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or cancelled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, Construction Manager, Architect, Engineer, its officials, officers, agents, employees, and volunteers.
21. The Certificates(s) and policies of insurance shall contain or shall be endorsed to contain the covenant of the insurance carrier (s) that it shall provide no less than thirty (30) days written notice be given to the City prior to any material modification or cancellation of such insurance. In the event of a material modification or cancellation of coverage, the City may terminate the Contract or stop the Work in accordance with the Contract Documents, unless the City receives, prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original policies, including all endorsements and attachments thereto evidencing coverage’s set forth herein and the insurance required herein is in full force and effect. Contractor shall not take possession, or use the Site, or commence operations under this Contract until the City has been furnished original Certificate(s) of Insurance and certified original copies of endorsements or policies of insurance including all endorsements and any and all other attachments as required in this Article. The original 499
Ontario Grand Park Rough Grading -34- SECTION 00700 – GENERAL CONDITIONS
endorsements for each policy and the Certificate of Insurance shall be signed by an individual authorized by the insurance carrier to do so on its behalf.
22. The Certificate(s) of Insurance, policies and endorsements shall so covenant and shall be construed as primary, and the City’s, Construction Manager’s, Architect’s, Engineer’s insurance and/or deductibles and/or self -insured retentions or self - insured programs shall not be construed as contributory.
23. The City reserves the right to adjust the monetary limits and types of insurance coverages during the term of this Contract including any extension thereof if, in the City’s reasonable judgment, the amount or type of insurance carried by the Contractor becomes inadequate.
24. Contractor shall report to the City, in addition to the Contractor’s insurer, any and all insurance claims submitted by the Contractor in connection with the Work under this Contract.
25. Products/completed operations coverage shall extend a minimum of three years after the project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, Construction Manager, Architect, Engineer, its officers, officials, agents employees, and volunteers shall be included as insureds under the policy.
ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS
5.1 Applicable Laws
A. Contractor shall give all notices required by and shall comply with all Applicable Laws applicable to the performance of the Work. Except where otherwise expressly required by Applicable Laws, neither the City nor the City’s Representative shall be responsible for monitoring Contractor’s compliance with any Applicable Laws. If Contractor performs any Work knowing or having reason to know that it is contrary to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, construction manager, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
5.2 Permits and Licenses
A. Permits and licenses necessary for prosecution of the Work shall be secured and paid for by Contractor, including, but not limited to, excavation permit, for plumbing, mechanical and electrical work and for operations in or over public streets or right of way under juri sdiction of public agencies other than the City, unless otherwise specified in the Contract Documents.
500
Ontario Grand Park Rough Grading -35- SECTION 00700 – GENERAL CONDITIONS
B. The Contractor shall arrange and pay for all off-site inspection of the Work related to permits and licenses, including certification, required by the specifications, drawings, or by governing authorities, except for such off -site inspections delineated as the City’s responsibility pursuant to the Contract Documents.
C. Before acceptance of the Work, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to the City.
5.3 Taxes
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid in accordance with the Applicable Laws of the place of the Project which are applicable during the pe rformance of the Work. In accordance with Revenue and Taxation Code section 107.6, the Contract Documents may create a possessory interest subject to personal property taxation for which Contractor will be responsible.
5.4 Traffic Control
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic control shall be performed at Contractor’s expense in accordance with the requirements of the City and/or the local agency with jurisdiction. Costs for traffic control plans, implementation of traffic control, or traffic signal services required by the City shall be included in the Contractor’s Bid.
B. All warning signs and safety devices used by the Contractor to perform the Work shall conform to the requirements contained in the State of California, Department of Transportation’s current edition of “Manual of Traffic Controls for Construction and Maintenance Work Zones” or to the requirements of the local agency. The Contractor shall also be responsible for all traffic control required by the agency having jurisdiction over the Project on the intersecting streets. Contractor must submit a traffic control plan to the agency having jurisdiction over the Project for approval prior to starting Work.
C. The Contractor’s representative on the site responsible for traffic control shall produce evidence that he/she has completed training acceptable to the California Department of Transportation for safety through construction zones. All of the streets in which the Work will occur shall remain open to traffic and one lane of traffic maintained at all times unless otherwise directed by the agency of jurisdiction.
Businesses and residences adjacent to the Work shall be notified forty-eight (48) hours in advance of closing of driveways. The Contractor shall make every effort to minimize the amount of public parking temporarily eliminated due to construction in areas fronting businesses. No stockpiles of pipe or other material will be allowed in traveled right -of-ways after working hours unless otherwise approved by the Engineer.
5.5 Safety
A. Contractor shall be solely responsible for all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their 501
Ontario Grand Park Rough Grading -36- SECTION 00700 – GENERAL CONDITIONS
work, nor for compliance with applicable safety laws. Contractor shall comply with all Applicable Laws relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property.
B. The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the availability o f emergency medical services for its employees in accordance with California Code of Regulations, Title 8, Section 1512. The Contractor shall submit an Illness and Injury Prevention Program and a Project Site specific safety program to the City prior to beginning Work. Contractor shall maintain a confined space program that meets or exceeds the City’s standards. Contractor needs to make themselves aware of the City’s safety policies and procedures, and shall meet or exceed all City standards in areas where the City must enter to perform inspections.
C. Hazard Communication Programs. Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the Site in accordance with Applicable Laws.
5.6 H
azardous Materials
A. The City shall not be responsible for any Hazardous Waste brought to the site by the Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous Waste onto the site in a manner not specified by the Contract Documents; and/or (ii) disturbs a Hazardous Material identified in the Contract Documents, the Contractor shall hire a qualified remediation contractor at Contractor’s sole cost to eliminate the condition as soon as possible. Under no circumstance shall the Contractor perform Work for which it is not qualified. The City, in its sole discretion, may require the Contractor to retain at Contractor’s cost an independent testing laboratory.
B. If the Contractor encounters a Hazardous Waste which may cause foreseeable injury or damage, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such material or substance (except in an emergency situation); and (iii) notify the City (and promptly thereafter confirm such notice in writing).
C. Subject to Contractor’s compliance with this Article 5.6(B), the City shall verify the presence or absence of the Hazardous Waste reported by the Contractor, except as qualified under Article 5.6(A) and Article 5.6(B) in the event such material or substance is found to be present, verify that the levels of the hazardous material are below OSHA Permissible Exposure Levels and below levels which would classify the material as a state of California or federal hazardous waste. When the material falls below such levels, Work in the affected area shall resume upon direction by the City.
502
Ontario Grand Park Rough Grading -37- SECTION 00700 – GENERAL CONDITIONS
D. C ontractor shall indemnify and hold harmless the City , Construction Manager, Architect, and Engineer from and against claims, damages, losses and expenses, arising from a Hazardous Waste on the Project Site, if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or levels which would classify the material as a state of California or federal hazardous waste, and was either i) shown on the Contract Documents or information available to bidders; or (ii) brought to the site by Contractor. Nothing in this paragraph shall obligate the Contractor to indemnify the City in the event of the sole or active negligence or willful misconduct of the City , Construction Manager, Architect, and Engineer its officers, agents, or employees.
5.7 Sanitary Facilities.
A. Contractor shall provide sanitary temporary toilet buildings and hand washing facilities for the use of all workers. All toilets and hand washing facilities shall comply with local codes and ordinances. Toilets shall be placed inside sealed secondary containment devices installed on a flat, level surface. Accumulated liquids in the secondary containment devices shall be properly removed and legally disposed without spillage onto the ground. Toilets shall be kept supplied with toilet paper and shall have workable door fasteners. Toilets and hand washing facilities shall be serviced no less than once weekly and shall be present in a quantity of not less than 1 per 20 workers as required by Cal/OSHA regulations. The toilets and hand washing facilities shall be maintained in a sanitary condition at all times. Use of toilet and hand washing facilities in the Work under construction shall not be permitted.
Any other sanitary facilities required by Cal/OSHA shall be the responsibility of the Contractor.
5.8 Dust Control
A. Contractor, at its expense, shall maintain all excavations, embankments, haul roads, permanent access roads, plant sites, waste disposal areas, borrow areas, and all other work areas free from dust. Industry accepted methods of dust control suitable for the area involved, such as sprinkling, chemical treatment, light bituminous treatment or similar methods, will be permitted.
5.9 Air Pollution Control
A. Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes. All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements.
B. Without limiting the foregoing, Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the Air Quality Management District with jurisdiction over the Project and/or California Air Resources Board (CARB). Contractor shall specifically be aware of the application of these limits and requirements to "portable equipment", which definition includes any item of equipment with a fuel -powered engine. Contractor shall indemnify the City against any fines or penalties imposed by the air quality management district, CARB, or any other governmental or regulatory agency for its 503
Ontario Grand Park Rough Grading -38- SECTION 00700 – GENERAL CONDITIONS
violations of Applicable Laws as well as those of its subcontractors or others for whom Contractor is responsible under its indemnity obligations provided for in the Contract Documents.
5.10 Water Quality Management and Compliance
A. Storm, surface, ground, nuisance, or other waters may be encountered at various times during construction of the Work. The Contractor hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.
B. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions regulating discharges of storm water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000- 14950); and any and all regulations, policies, or permits issued pursuant to any such authority. These include, but are not limited to California State Water Resources Control Board Order Number 2009- 0009-DWQ (NPDES Permit No. CAS000002), as amended by Order Numbers 2010 -0014-DWQ, 2012- 0006-DWQ, and any subsequent amendment to or renewal thereof, State Water Resources Control Board Order No. 2013 -0001-DWQ (NPDES Order No. CAS000004), Santa Ana Regional Water Quality Control Board No. R8-2010-0036 (NPDES No. CAS618036), and any amendment or renewal thereof.
C. Contractor shall comply with all conditions of the State Water Resources Control Board (“State Water Board”) National Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction Activity (“Construction General Permit”) for all construction activity which results in the disturbance of in excess of one acre of total land area or which is part of a larger common area of development or sale.
Contractor shall comply with the lawful requirements of the City, and any other applicable municipality, drainage district, or other local agency with jurisdiction over the location where the Work is to be conducted, regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.
D. Unless otherwise specified in the Special Conditions or other portion of the Contract Documents, the City has not prepared a Storm Water Pollution Prevention Plan (“SWPPP”) or other storm water compliance plan for the Project Site. Contractor shall be responsible for filing the Notice of Intent (“NOI”) and for obtaining coverage under the Construction General Permit. This includes filing all necessary documentation including the Permit Registration Documents (“PRDs”) through the Stormwater Multiple Applications and Report Tracking System (“SMARTS”); preparing and implementing a SWPPP for the Work site; implementing all other provisions, and monitoring and reporting requirements required by the Construction General Permit; and providing a Qualified SWPPP Developer (“QSD”) and Qualified SWPPP Practitioner (“QSP”), as necessary for all Work site activities, including but not limited to preparation and submittal of all reports, plans, inspections, and monitoring information in compliance with the Construction General Permit. All 504
Ontario Grand Park Rough Grading -39- SECTION 00700 – GENERAL CONDITIONS
submittals shall be coordinated with the City ’s Legally Responsible Person and Authorized Signatory as those terms are defined in the Construction General Permit.
Before any NOI, PRD, SWPPP, or other Construction General Permit -related document may be submitted to the State Water Board or implemented on the Project site, it must first be reviewed and approved by the City and/or City’s designee.
Contractor shall include all costs of compliance with specified requirements in the Contract Price.
E. The City retains the right to develop its own documentation for the Project site, including but not limited to the SWPPP, and in the alternative may require Contractor to adopt and implement portions of the City developed SWPPP. The City expressly reserves the right to procure coverage under the Construction General Permit for the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise fails to proceed in a manner that complies with the requirements of the Construction General Permit. The City additionally reserves the right to hire additional contractors to maintain compliance at the Work site. Whether Contractor has adequately maintained compliance with the Construction General Permit shall be the City’s sole determination. Any costs incurred by the City in procuring coverage under the Construction General Permit, or drafting and/or implementing a SWPPP for the Work site shall be paid by Contractor.
F. Notwithstanding the above, for those Work sites where construction activity results in the disturbance of less than one acre of total land area and/or do not need coverage under the Construction General Permit, the Contractor shall be responsible for preparing and implementing an Erosion and Sediment Control Plan in accordance with State Water Resources Control Board Order No. 2013- 0001- DWQ (NPDES Order No. CAS000004) and any amendment to or renewal thereof.
G. Failure to comply with the Construction General Permit, laws, regulations, and ordinances listed in this Article is a violation of federal and state law.
Notwithstanding any other indemnity contained in these Contract Documents , Contractor agrees to indemnify and hold har mless the City, Construction Manager, Architect, and Engineer its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, fees, costs, expenses, or losses or liabilities of any kind or nature which the City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the Permit, laws, regulations, and ordinances listed above, arising out of or in connection with the Work, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers.
H. The City reserves the right to defend any enforcement action or civil action brought against the City for Contractor’s failure to comply with any applicable water quality law, regulation, or policy. Contractor hereby agrees to be bound by, and to reimburse the City for the costs associated with, any settlement reached between the City and any relevant enforcement entity.
5.11 Environmental Quality Protection
A. The Contractor shall comply with all requirements of applicable f ederal, state, and local environmental rules and regulations. Any infractions of said rules and 505
Ontario Grand Park Rough Grading -40- SECTION 00700 – GENERAL CONDITIONS
regulations by the Contractor dur ing the term of the Contract, which result in penalties, will be the responsibility of the Contractor. The City operates under a number of environmental permits issued by various agencies. If due to an action, inaction, or negligence by the Contractor , the City becomes subject to non- compliance penalties, the cost of such penalties shall be borne by the Contractor.
B. The Contractor shall exercise care to preserve the natural landscape and vegetation, and shall conduct operations so as to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the Work.
Movement of crews and equipment within the rights-of-way and over routes provided for access to the Work shall be performed in a manner to prevent damage to property. When no longer required, construction roads shall be restored to original contours. Upon completion of the Work, and following removal of construction facilities and required cleanup, land used for construction purposes and not required for the completed installation shall be scarified and regraded, as required, so that all surfaces are left in a condition that will facilitate natural revegetation, provide for proper drainage, and prevent erosion.
C. If, in the performance of the Work, evidence of the possible occurrence of any Federally listed threatened or endangered plant or animal is discovered, the Contractor shall notify the City Representative immediately, giving the location and nature of the f indings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to City within two (2) Days. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the endangered plant or animal. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Any City directed changes to the Work as a result of a siting will be pursuant to the Contract Documents. Any costs or delays incurred by City or the Contractor due to unreasonable or false notification of an endangered plant or animal will be borne by the Contractor.
D. If, in the performance of the Work, Contractor should unearth cultural resources (for example, human remains, animal bones, stone tools, artifacts and/or midden deposits) through excavation, grading, watering or other means, the Contractor shall notify the construction/archeological m onitor and/or the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to the construction/archeological monitor and/or City within two (2) Days. The Contractor shall immediately cease all construction activities in the immediate a rea of the discovery to the extent necessary to protect the cultural resource. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or re -sequence and/or alter its performanc e to ensure full compliance with all applicable permits, laws and regulations. Should the presence of cultural resources be confirmed, the Contractor will assist the City Representative and the construction/ archeological monitor in the preparation and implementation of a data recovery plan. The Contractor shall provide such cooperation and assistance as may be necessary to preserve the cultural resources for removal or other disposition. Any City directed changes to the Work as a result of the cultural resource will be pursuant to the Contract Documents. Should Contractor, without permission, injure, destroy, excavate, appropriate, or remove 506
Ontario Grand Park Rough Grading -41- SECTION 00700 – GENERAL CONDITIONS
any cultural resource on or adjacent to the Site, it will be subject to disciplinary action, arrest and penalty under applicable law. The Contractor shall be principally responsible for all costs of mitigation and/or restoration of cultural resources related to the unauthorized actions identified above. Contractor shall be required to pay for unauthorized damage and m itigation costs to cultural resources (historical and archeological resources) as a result of unauthorized activities that damage cultural resources and shall indemnify City pursuant to the Contract Documents.
5.12 Excessive Noise
A. Contractor shall use only such equipment on the Work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by Cal/OSHA. Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements.
B. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.
5.13 Diversion of Recyclable Waste Material
A. In compliance with the applicable City’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers as required for compliance with the local jurisdiction’s waste diversion ordinances. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests. Contractor shall complete and execute any certification forms required by the City or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of the Contractor.
5.14 Inspector’s Field Office.
A. Provided by the Construction Manager. .
5.15 Contractor’s Supervision.
A. Contractor shall continuously keep at the Project site, a competent and experienced full-time Project superintendent acceptable to the City. Superintendent must be able to proficiently speak, read and write in English and shall have the authority to make decisions on behalf of the Contractor. Contractor shall continuously provide efficient supervision of the Project.
507
Ontario Grand Park Rough Grading -42- SECTION 00700 – GENERAL CONDITIONS
5.16 Workers.
A. Contractor shall at all times enforce strict discipline and good order among its employees. Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.
B. Any person in the employ of the Contractor whom the City may deem incompetent or unfit shall be dismissed from the Work and shall not be employed on this Project.
5.17 Independent Contractors.
A. Contractor shall be an independent contractor for the City and not an employee.
Contractor understands and agrees that it and all of its employees shall not be considered officers, employees, or agents of the City and are not entitled to benefits of any kind normally provided employees of the City, including but not limited to, state unemployment compensation or workers’ compensation. Contractor assumes full responsibility for the acts and omissions of its employees or agents related to the Work.
5.18 Verification of Employment Eligibility.
A. By executing the Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors, sub-subcontractors and consultants to comply with the same. Each person executing this Contract on behalf of Contractor verifies that he or she is a duly authorized officer of Contractor and that any of the following shall be grounds for the City to terminate the Contract for cause: (1) failure of the Contractor or its Subcontractors, sub-subcontractors or consultants to meet any of the requirements provided for in this Article; (2) any misrepresentation or material omission concerning compliance with such requirements; or (3) failure to immediately remove from the Work any person found not to be in compliance with such requirements.
5.19 Labor.
A. Hours of Work
1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall constitute a legal day’s work. The time of service of any worker employed at any time by the Contractor or by any subcontractor on any subcontract under this Contract upon the Work or upon any part of the Work contemplated by this Contract is limited and restricted to eight (8) hours during any one calendar day and 40 hours during any one calendar week, except as hereinafter provided.
Notwithstanding the provisions herein above set forth, work performed by employees of Contractor in excess of eight (8) hours per day, and 40 hours during any one week, shall be permitted upon this public work upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and one- half times the basic rate of pay.
508
Ontario Grand Park Rough Grading -43- SECTION 00700 – GENERAL CONDITIONS
2. The Contractor and every Subcontractor shall keep an accurate record showing the name of and actual hours worked each calendar day and each calendar week by each worker employed in connection with the Work or any part of the Work contemplated by this Contract. The record shall be kept open at all reasonable hours to the inspection of the City and to the Division of Labor Law Enforcement, Department of Industrial Relations of the State of California.
3. The Contractor shall pay to the City a penalty of twenty -five dollars ($25.00) for each worker employed in the execution of this Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day and 40 hours in any one calendar week in violation of the provisions of Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.
4. Any work necessary to be performed after regular working hours, or on Saturdays and Sundays or other holidays, shall be performed without additional expense to the City.
5. If Contractor gives notice of an inspection pursuant to the Contract Documents, the City will provide inspection during normal working hours from 7:00 a.m. to 3:30 p.m. Monday through Friday. Requested i nspections before or after this time will be charged to the Contractor as reimbursable inspection time. Inspections on weekends requires two (2) D ays’ notice for review and approval. Upon written request and approval the 8.5 hour working day may be changed to other limits subject to city/county ordinance.
6. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project S ite, other than between the hours of 7:00 a.m. to 5:00 p.m., unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance
1. Pursuant to Labor Code section 1776, Contractor and all subcontractors shall maintain weekly certified payroll records, showing the names, addresses, Social Security numbers, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by them in connection with the Work under this Contract. Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor shall also require Subcontractor(s) to certify weekly payroll records under penalty of perjury.
509
Ontario Grand Park Rough Grading -44- SECTION 00700 – GENERAL CONDITIONS
2. In accordance with Labor Code section 1771.4, the Contractor and each Subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (“DIR”) on the specified interval and format prescribed by the DIR, which may include electronic submission. Contractor shall comply with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.
3. Any stop orders issued by the DIR against Contractor or any S ubcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable li quidated damages and shall not be compensable by the City . Contractor shall defend, indemnify and hold the City, Construction Manager, Architect, Engineer , and its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against Contractor or any Subcontractor.
4. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City. The Contractor shall also provide the following:
a. A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.
b. A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the DIR.
5. Unless submitted electronically, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.
6. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency, the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be mar ked or obliterated in such a manner as to prevent disclosure of an individual's name, address and social security number. The name and address of the Contractor awarded the Contract or performing the Contract shall not be marked or obliterated.
7. In the event of noncompliance with the requirements of this Article, the Contractor shall have ten (10) Days in which to comply subsequent to receipt of written notice specifying in what respects the Contractor must comply with this Article. Should noncompliance still be evident after such 10- day period, the Contractor shall pay a penalty of one hundred dollars ($100.00) to the City for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor 510
Ontario Grand Park Rough Grading -45- SECTION 00700 – GENERAL CONDITIONS
Standards Enforcement, such penalties shall be withheld from progress payment then due.
8. The responsibility for compliance with this Article shall rest upon the Contractor.
C. Prevailing Rates of Wages
1. The Contractor is aware of the requirements of Labor Code sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Contract from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of the prevailing rate of per diem wages which are on file at the City’s Administration Office and shall be made available to interested parties upon request. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold the City, Construction Manager, Architect, Engineer, and its officials, officers, employees and authorized voluntee rs free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.
2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate as determined by the Director of the DIR for such work or craft in which such worker is employed for any public work done under the Contract by it or by any Subcontractor under it. The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker by the Contractor.
3. Contractor shall post, at appropriate conspicuous points on the Project Site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.
D. Public Works Contractor Registration
1. Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its Subcontractors must be registered with the DIR prior to the execution of a contract to perform public works. By entering into this Contract, Contractor represents that it is aware of the registration requirement and is currently registered with the DIR.
Contractor shall maintain a current registration for the duration of the Project.
Contractor shall further include the requirements of Labor Code sections 1725.5 511
Ontario Grand Park Rough Grading -46- SECTION 00700 – GENERAL CONDITIONS
and 1771.1 in any subcontract and ensure that all S ubcontractors are registered at the time this Contract is entered into and maintain registration for the duration of the Project. Notwithstanding the foregoing, the cont ractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
E. Employment of Apprentices
1. Contractor and all Subcontractors shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices.
2. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
3. Knowing violations of Labor Code section 1777.5 will result in forfeiture not to exceed one hundred dollars ($100.00) for each calendar day of non- compliance pursuant to Labor Code section 1777.7.
F. Nondiscrimination/Equal Employment Opportunity
1. Pursuant to Labor Code section 1735 and other applicable provisions of law, the Contractor and its Subcontractors shall not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law.
G. Debarment of Contractors and Subcontractors
1. Contractors or Subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.
5.20 Subcontracts.
A. Contractor agrees to bind every Subcontractor to the terms of the Contract Documents as far as such terms are applicable to S ubcontractor’s portion of the 512
Ontario Grand Park Rough Grading -47- SECTION 00700 – GENERAL CONDITIONS
Work. Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by Contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the City.
B. The City reserves the right to accept all subcontractors. The City ’s acceptance of any Subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.
C. Prior to substituting any Subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code section 4100 et seq.
5.21 Progress Meetings
A. The Construction Manager shall schedule and hold regular progress meetings at least weekly and at other times as requested by Architect / Engineer or as required by progress of the Work. The Construction Manager, Contractor, and City shall attend each meeting. Contractor may at its discretion request attendance by representatives of its Suppliers, manufacturers, and other Subcontractors. The Construction Manager will preside at the progress meetings and will arrange for keeping and distributing the minutes. The purpose of the meetings is to review the progress of the Work, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems which may develop. During each meeting, the Contractor shall present any issues which may impact its progress with a view to resolve these issues expeditiously. Refer to the Division 01 for additional requirements.
5.22 Submittals
A. Schedule of Submittals. Within five (5) Days after the Notice to Proceed (unless otherwise specified in the Contract Documents), Contractor will prepare and deliver a Schedule of Submittals to the City that has been fully integrated with the progress schedule and identifies each Submittal required by the Contract Documents as well as the date on which Contractor will deliver each Submittal to the City . Critical submittals as identified in the Section 00750 – Special Conditions will be required prior to first payment. The balance of the submittals will be required within 60 days from the Notice to Proceed. The Contractor is responsible for any schedule delays resulting from the Submittal process.
B. S
ubmittal Procedures.
1. Contractor will follow the following procedures for each Submittal, Shop Drawing and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised Submittals with original number and sequential alphabetic suffix. 513
Ontario Grand Park Rough Grading -48- SECTION 00700 – GENERAL CONDITIONS
c. Each Submittal will identify the Project, Contractor, Subcontractor and Supplier, pertinent Drawing and detail number, and Specification Section number appropriate to Submittal.
d. By transmitting a Submittal, Contractor certifies it has reviewed and approved each Submittal, verified products required, field dimensions, adjacent construction Work, and that coordination of information is according to requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations that may differ and/or be detrimental to successful performance of completed Work.
f. When Submittal is revised for resubmission, Contractor shall promptly address the City’s comments and resubmit. Contractor shall identify changes made since previous submission.
g. The Cit y’s review of S hop Drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called the City ’s attention to such deviations at time of submission and the City has taken no exception to the deviation. The City’s review of S hop Drawings shall not relieve Contractor from responsibility for errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from incomplete Submittals are not the responsibility of the City. j. Contractor shall not be entitled to any extension of the Contract Times as a result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of S ubmittals unless otherwise specified in the Contract Documents.
2. Where a Submittal, Shop Drawing or Sample is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to the City review and approval of the pertinent submittal will be performed at the sole risk and expense and responsibility of Contractor.
C. Schedule Milestone for Submittals. Contractor must submit all Submittals required by the Contract Documents in accordance with the Schedule of Submittals. If Contractor fails to submit the Submittals in accordance with the Schedule of Submittals, Contractor will be solely liable for any delays or impacts caused by the delayed Submittal, whether direct or indirect. Contractor will be liable for the time calculated from the date the Submittal is due until the date a compliant Submittal is made. A compliant Submittal will be one that is complete and satisfies the requirements of the Contract Documents.
514
Ontario Grand Park Rough Grading -49- SECTION 00700 – GENERAL CONDITIONS
5.23 Shop Drawings and Sample Submittal Procedures.
A. Before submitting each Shop Drawing or Sample, Contractor shall have:
1. R eviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the r equirements of the Work and the Contract Documents;
2. D etermined and verified all field measurements, quantities, dimensions, specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto;
3. D etermined and verified the suitability of all materials offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and
4. D etermined and verified all information relative to Contractor’s responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto.
B. With each S ubmittal, Contractor shall give the City specific written notice of any variations that the Shop Drawing or Sample may have from the requirements of the Contract Documents. This notice shall be both a written communication separate from the Shop Drawings or Sample Submittal and, in addition, a specific notation made on each Shop Drawing or Sample submitted to the City for review and approval of each such variation.
C. Shop Drawings.
1. Data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show the City the services, materials, and equipment Contractor proposes to provide and to enable the City to review the information for assessing conformance with information given and design concept expressed in Contract Documents.
2. When required by individual Specification sections, provide Shop Drawings signed and sealed by a professional e ngineer responsible for designing components shown on Shop Drawings. Shop Drawings must include signed and sealed calculations to support design in a form suitable for submission to and approval by authorities having jurisdiction.
3. Shop Drawings for steel structures shall consist of shop details, erection and other working Drawings showing details, dimensions, sizes of members and other information necessary for the complete fabrication and erection of the metal work.
4. Shop Drawings of concrete structures shall consist of such detailed d rawings as may reasonably be required for the successful prosecution of the Work and which are not included in the Drawings furnished by the Engineer. These may include drawings for false work, bracing, centering and form work, masonry layout diagrams, and diagrams for bent reinforcement.
515
Ontario Grand Park Rough Grading -50- SECTION 00700 – GENERAL CONDITIONS
5. Contractor shall make revisions and provide additional information when required by authorities having jurisdiction.
D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as required to enable the City to review the submittal for assessing conformance with information given and design concept expressed in Contract Documents. Samples should be of appropriate size and detail to assess functional, aesthetic, color, texture, patterns and finish selection.
E. Cit y ’s Review.
1. The City will review Shop Drawings and Samples in accordance with the Schedule of Submittals. The City’s review and acceptance will be only to determine if the items covered by the Submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents.
2. The City review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions.
3. The City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless the City has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample.
F. Resubmittal Procedures. Contractor shall make corrections required by the City and shall return corrected Shop Drawings and submit, as required, new Samples for review and approval. Contractor shall direct specific attention in writing to revisions other than the corrections called for by the City on previous Submittals.
5.24 R ecord (“As -Built”) Drawings.
A. The Construction Manager shall maintain one record set of Contract Documents at the Site or digitally in an acceptable format. On these, it shall mark all Project conditions, locations, configurations, and any other changes or deviations which may vary from the information represented in the original Contract Documents, including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Drawings. For all Projects involving the installation of any pipeline, Contractor shall survey and record the top of the pipe at a minimum of every 100 linear feet, and at each bend, recording both the horizontal and vertical locations. Said Drawings shall be supplemented by any detailed sketches as necessary or directed to fully indicate the Work as actually constructed. Any required as-built drawings of civil engineering elements of the Work shall be prepared by a registered civil engineer.
516
Ontario Grand Park Rough Grading -51- SECTION 00700 – GENERAL CONDITIONS
B. These master Record Drawings of the as -built conditions, including all revisions made necessary by Addenda and Change Orders , shall be maintained up- to-date during the progress of the Project. Red ink shall be used for alterations and notes.
Notes shall identify relevant Change Orders by number and date. Record Drawings shall be accessible to the Engineer at all times during the construction period.
Failure on the Contractor’s part to keep R ecord Drawings current could result in withholding partial payment.
C. Upon completion of the Project and as a condition of final acceptance, the Construction Manager shall finalize and deliver a complete set of Record Drawings to the Engineers. The information submitted by the Contractor will be assumed to be correct, and the Contractor shall be responsible for, and liable to the City, for the accuracy of such information, and for any errors or omissions which may or may not appear on the Record Drawings.
D. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete the Record Drawings shall be included in Contractor’s bid and distributed in the Bid Schedule. No additional compensation shall be made to the Contractor for this Work.
5.25 Layout and Field Engineering.
A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys required for the control and completion of the Work, and all necessary surveys to compute quantities of Work performed.
5.26 Separate Contracts and Cooperation.
A. Separate Contracts. The City reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the Work in place or discrepancies with the Contract Documents.
B. C
ooperation. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the City in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project.
Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer shall decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The City shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project Site.
517
Ontario Grand Park Rough Grading -52- SECTION 00700 – GENERAL CONDITIONS
5.27 Work Site.
A. Limitation of Use of Site and Other Areas . Rights-of-way, easements, or rights-of- entry for the Work will be provided by the City. Unless otherwise specified in the Special Provisions, the Contractor shall make arrangements, pay for, and assume all responsibility for acquiring, using, and disposing of additional work areas and facilities temporarily required. The Contractor shall indemnify and hold the City , Construction Manager, Architect, and Engineer harmless from all claims for damages caused by such actions. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Applicable Laws, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to City or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work.
B. S
ite Maintenance. During the progress of the Work, Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to Applicable Laws. The Contractor shall furnish trash bins for all debris from construction. All debris shall be placed in trash bins daily. Forms and false-work that are to be re- used shall be stacked neatly concurrently with their removal. Forms and false- work that are not to be re- used shall be disposed of concurrently with their removal.
C. C
leaning. Prior to Completion of the Work, Contractor shall clean the Site and make it ready for utilization by the City . At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents.
5.28 Ut ility Usage.
A. All temporary utilities, including but not limited to electricity, water, gas, and telephone, used on the Work shall be furnished and paid for by Contractor.
Contractor shall provide necessary temporary distribution systems, including meters, if necessary, from distribution points to points on the Work where the utility is needed. Upon completion of the Work, Contractor shall remove all temporary distribution systems. Contractor shall provide necessary and adequate utilities and pay all costs for water, electricity, gas, oil, and sewer charges required for completion of the Work, including but not limited to startup and testing required in the Contract Documents. All permanent meters installed shall be listed in the Contractor’s name until the Work is accepted. For Work to be performed in existing City facilities, Contractor may use the City ’s existing utilities, provided such use is reasonable under the circumstances. If Contractor uses the City utilities, it will not need to compensate the City for reasonably consumption of utilities, but Contractor will be responsible for any excessive, unreasonable or wasteful utility usage. Amounts due the City under this section may be deducted from progress payments. 518
Ontario Grand Park Rough Grading -53- SECTION 00700 – GENERAL CONDITIONS
5.29 Protection of Work and Property.
A. The Contractor shall digitally record video and take photographs of the Project site and adjacent improvements in a manner and quality that clearly depicts the existing condition of the Project Site and adjacent improvements immediately prior to the start of Work (minimum 1080p video and 4MP photo). All videos and photographs shall be date and time stamped. The Contractor shall submit the video and photos in digital format on a memory stick before the commencement of Work, along with a map outlining the route and locations of the videos and/or photographs. The Contractor shall be responsible for all damages to persons or property that occur as a result of the Work. Contractor shall be responsible for the proper care and protection of all materials delivered and W ork performed until completion and final acceptance by the City. All Work shall be solely at the Contractor’s risk.
B. Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed. Contractor shall erect and properly maintain at all times, as required by field conditions and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.
C. Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions.
D. Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by the Work operations. Contractor shall:
1. Enclose the working area with a substantial barricade, and arrange work to cause minimum amount of inconvenience and danger to the public.
2. Provide substantial barricades around any shrubs or trees indicated to be preserved.
3. Deliver materials to the Site over a route designated by the City.
4. Provide any and all dust control required and follow the applicable air quality regulations as appropriate. If the Contractor does not comply immediately with a notice from the City or a public agency responsible for air quality, the City shall have the authority to provide dust control and deduct the cost from payments to the Contractor.
5. Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or directions of the City.
Contractor shall not unreasonably encumber the Site with its materials. 519
Ontario Grand Park Rough Grading -54- SECTION 00700 – GENERAL CONDITIONS
6. Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by a civil engineer or land surveyor acceptable to the City, at no cost to the City.
7. Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to the City.
8. Preserve and protect from injury all buildings, pole lines and all directional, warning and mileage signs that have been placed within the right-of-way.
9. At the completion of work each day, leave the Work and the Site in a clean, safe condition.
10. Comply with any stage construction and/or traffic handling plans. Access to residences and businesses shall be maintained at all times, except with the City’s written approval. Any request for approval to reduce or r estrict access to residences and business must be submitted to the City at least seven (7) Days in advance, and the City may issue or withhold approval in its sole discretion.
E. These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the work involved in the protection and preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefor.
F. Should damage to persons or property occur as a result of the Work, Contractor shall promptly notify the City , in writing. Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. The City shall be entitled to inspect and copy any such documentation, video, or photographs.
G. Contractor shall maintain all investigation documentation including video and/or photographs for a minimum of four (4) years following completion of the Project.
5.30 Emergencies.
A. In emergencies affecting the safety or protection of persons or the Work or Property at the Site or adjacent thereto, the Contractor, without special instruction or authorization from the City or the Engineer, is obligated to act to prevent threatened damage, injury or loss. The Contractor shall give the Engineer prompt written notice if the Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby.
ARTICLE 6 -MATERIALS; INSPECTION
6.1 Access to Work.
A. The City, Construction Manage, Architect, Engineer, their consultants and other representatives and personnel, independent testing laboratories, and governmental 520
Ontario Grand Park Rough Grading -55- SECTION 00700 – GENERAL CONDITIONS
agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs.
6.2 Materials.
A. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, water, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities whatsoever necessary to execute and complete this Contract within the Contract Time. Unless otherwise specified, all materials, parts, and equipment furnished by the Contractor in the Work shall be new, the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality.
B. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the Work and agrees upon completion of all work to deliver the Project, to the City free from any claims, liens, or charges.
C. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work. Materials shall be stored on the Project Site in such manner so as not to interfere with any operations of the City or any independent contractor.
D. Contractor shall verify all measurements, dimensions, elevations, and quantities before ordering any materials or performing any Work, and the City shall not be liable for Contractor’s failure to so. Except for an adjustment to Unit Price Work for item overruns and underruns in accordance with the Contract Documents, no additional compensation, over and above payment for the actual quantities at the prices set out in the Bid Schedule, will be allowed because of differences between actual measurements, dimension, elevations and quantities and those indicated on the Plans and in the Specifications. Any difference therein shall be submitted to the Engineer for consideration before proceeding with the Work.
6.3 Test and Inspections.
A. Inspection and Testing of Work and Materials
1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or public authority requires any part of the Work to be tested or approved, Contractor shall provide the Engineer at least two (2) working days’ notice of its readiness for observation or inspection. If inspection is by a public authority other than the City, Contractor shall promptly inform the City of the date fixed for such inspection.
Required certificates of inspection (or similar) shall be secured by Contractor. 521
Ontario Grand Park Rough Grading -56- SECTION 00700 – GENERAL CONDITIONS
Costs for City testing and inspection shall be paid by the City. Costs of tests for Work found not to be in compliance shall be paid by the Contractor.
2. The Contractor shall pay for the cost of any minimum “show up” costs of a materials testing technician that was called for by the Contractor but ultimately the Contractor work was not ready for the inspection. Any such costs shall be deducted from any amounts due to the Contractor.
3. If any Work is done or covered up without the required testing or approval , the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor ’s cost in compliance with the Contract Documents.
4. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the City, and not by Contractor.
Unless otherwise stated and as provided by the Contract Documents, the City shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.
5. Reexamination of Work may be ordered by the City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the City shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.
B. Testing of Materials
1. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the City so that the City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into the Work.
2. If the manufacture of materials to be inspected or tested will occur in a plant or location greater than sixty (60) miles from the City, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, inc luding but not limited to excessive travel time, standby time and required lodging.
3. Unless otherwise specified in the Special Provisions, all initial testing and a reasonable amount of retesting will be performed under the direction of the Engineer, and at no expense to the Contractor. The Contractor shall notify the Engineer in writing, at least 15 days in advance, of its intention to use materials for which tests are specified, to allow sufficient time to perform the tests. The notice shall name the proposed supplier and source of material. If the notice of intent to use is sent before the materials are available for testing or inspection, or is sent so far in advance that the materials on hand at the time will not last but will be replaced by a new lot prior to use on the Work, it will be the Contractor's responsibility to re- notify the Engineer when samples which are representative may be obtained. 522
Ontario Grand Park Rough Grading -57- SECTION 00700 – GENERAL CONDITIONS
4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of any material or assembled material for which these Specifications so require or if so required by the Engineer. The Engineer may waive the materials testing requirements and accept a Certificate of Compliance. Material test data may be required by the Engineer to be included with the submittal. Materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The submission of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material into the Work which conforms to the requirements of the Contract Documents, and any material not conforming to the requirements will be subject to rejection by the Engineer whether in place or not.
5. Copies of mill certificates of composition and quality of all component materials (reinforcing steel, structural steel, lumber, etc.) incorporated in the construction of the Work shall be provided to the City at the time of delivery. City shall retain the right to reject any raw material not provided with a mill certificate at the time of delivery.
6. If, after incorporating such materials into the Work, it is found that sources of supply that have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall furnish approved material from other approved sources. If any product proves unacceptable after improper storage, handling or for any other reason it shall be rejected, not incorporated into the W ork, and shall be removed from the P roject Site all at the Contractor’s expense.
6.4 Requests for Substitutions.
A. For the purposes of this provision, the term “substitution” shall mean the substitution of any material, method or service substantially equal to or better in every respect to that indicated in the Standard Specifications or otherwise referenced herein.
B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that is described in the Notice Inviting Bids that designates certain products, things, or services by specific brand or trade name.
C. Unless specifically designated in the Special Conditions, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such specifications shall be deemed to be used for the purpose of facilitating the description of the material, process, or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, process, or article which may be substantially equal to or better in every respect to that so indicated or specified in the Contract Documents. However, the City has adopted uniform standards for certain materials, processes, and articles.
D. The Contractor shall submit substitution requests, together with substantiating data, for substitution of any “or equal” material, process, or article no later than ten (1 0) calendar days prior to the bid date. Provisions regarding submission of substitution requests shall not in any way authorize an extension of time for the performance of this Contract. If a substitution request is rejected by the City, the Contractor shall provide the material, method or service specified herein. The City shall not be 523
Ontario Grand Park Rough Grading -58- SECTION 00700 – GENERAL CONDITIONS
responsible for any costs incurred by the Cont ractor associated with substitution requests. The burden of proof as to the equality of any material, process, or article shall rest with the Contractor. The Engineer has the complete and sole discretion to determine if a material, process, or article is substantially equal to or better than that specified and to approve or reject all substitution requests.
E. Substantiating data as described above shall include, at a minimum, the following information:
1. A signed affidavit from the Contractor stating that the material, process, or article proposed as a substitution is substantially equal to or better than that specified in every way except as may be listed on the affidavit.
2. Illustrations, specifications, catalog cut sheets, and any other relevant data required to prove that the material, process, or article is substantially equal to or better than that specified.
3. A statement of the cost implications of the substitution being requested, indicating whether and why the proposed substitution will reduce or increase the amount of the contract.
4. Information detailing the durability and lifecycle costs of the proposed substitution.
F. Failure to submit all the required substantiating data detailed above in a timely manner so that the substitution request can be adequately reviewed may result in rejection of the substitution request. The Engineer is not obligated to review multiple submittals related the same substitution request resulting from the Contractor’s failure to initially submit a complete package.
G. Time limitations within this Article shall be strictly complied with and in no case will an extension of time for completion of the contract be granted because of Contractor’s failure to provide substitution requests at the time and in the manner described herein.
H. The Contractor shall bear the costs of all the City work associated with the review of substitution requests.
I. If substitution requests approved by the Engineer require that Contractor furnish materials, methods or services more expensive than that specified, the increased costs shall be borne by Contractor.
J. Products Specified Which Are Commercially Unavailable
1. If the Contractor fails to make a request for substitutions for products, prior to the submission of its bid, and such products subsequently become commercially unavailable, the Contractor may request a substitution for such commercially unavailable item. The decision to grant this request is solely at the City’s discretion. The written approval of the City, consistent with the procedure for Change Orders, shall be required for the use of a proposed substitute material. The City may condition its approval of the substitution upon the delivery to City of an extended warranty or other assurances of adequate 524
Ontario Grand Park Rough Grading -59- SECTION 00700 – GENERAL CONDITIONS
performance of the substitution as well as an equitable deduction in the Contract Price should the substituted item cost less than the Specified Item.
All risks of delay due to approval of a requested substitution by any other governmental agency having jurisdiction, shall be on the requesting party. All additional costs, review costs, all procurement and construction delays, and all costs for review by the Architect or its consultants shall be the responsibility of the Contractor and will be deducted from Contractor’s pay request.
ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES
7.1 Soils Investigations.
A. When a soils investigation report for the Site is available, such report is provided for informational purposes only. Any information obtained from such report as to subsurface soil condition, or to elevations of existing grades or elevations of underlying rock, is approximate only and is not guaranteed. C ontractor acknowledges that any soils investigation report (including any borings) was prepared for purposes of design only and Contractor is required to examine the Site before submitting its B id and must make whatever tests it deems appropriate to determine the condition of the soil.
7.2 O wnership of Site Materials Found.
A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials developed or obtained in the excavation or other operations of Contractor or any of its Subcontractors in the performance of the Contract, and the right to use said items in carrying out the Contract, or to dispose of same, is hereby expressly reserved by the City . Neither Contractor nor any of its Subcontractors nor any of their representatives or employees shall have any right, title, or interest in said materials, nor shall they assert or make any claim thereto. Contractor will, as determined by the City’s Representative, be permitted to use in the Work without charge, any such materials which meet the requirements of the Contract Documents, provided the City shall have the right to use or consume these materials without payment to a third party.
7.3 Existence of Utilities at the Work Site.
A. Existing Utilities
1. The location of known existing utilities and pipelines are shown on the Plans in their approximate locations. However, nothing herein shall be deemed to require the City to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the site of the project can be inferred from the presence of other visible facilities, such as buildings, cleanouts, meter and junction boxes, on or adjacent to the Site of the Project.
2. The City will assume the responsibility for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the Project site if such utilities are not identified by the City in the Contract Documents or which cannot reasonably be inferred from the presence of other visible facilities. 525
Ontario Grand Park Rough Grading -60- SECTION 00700 – GENERAL CONDITIONS
B. Utility Location
1. It shall be the Contractor’s responsibility to determine the exact location and depth of all utilities, including service connections, which have been marked by the respective utility owners and which the Contractor believes may affect or be affected by the Contractor’s operations. The Contractor shall not be entitled to additional compensation nor time extensions for work necessary to avoid interferences nor for repair to damaged utilities if the Contractor does not expose all such existing utilities as required by this Article.
2. The locating of utilities shall be in conformance with Government Code Section 4216 et seq. except for the City’s utilities located on the City’s property and not on public right-of-way.
3. A “High Priority Subsurface Installation” is defined in Government Code Section 4216 (j) as “high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig) or greater than six inches nominal pipe diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.”
4. A “Subsurface Installation” is defined in Government Code Section 4216 ( s) as “any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized drain lines.”
5. Pursuant to Government Code Section 4216.2 the Contractor shall contact the appropriate regional notification center at least two (2) working days but not more than 14 Days before performing any excavation. The date of the notification shall not count as part of the two-working-day notice. Before notifying the appropriate regional notification center, the Contractor shall delineate the area to be excavated. The Contractor shall request that the utility owners conduct a utility survey and mark or otherwise indicate the location of their service. The Contractor shall furnish to the Engineer written documentation of its contact(s) with the regional notification center prior to commencing excavation at such locations.
6. After the utility survey is completed, the Contractor shall commence “potholing” or hand digging to determine the actual location of the pipe, duct, or conduit and in accordance with Government Code Section 4216.4 if the excavation within the “tolerance zone” of a subsurface installation. The Engineer shall be given notice prior to commencing potholing operations. The Contractor shall uncover all piping and conduits, to a point one (1) foot below the pipe, where crossings, interferences, or connections are shown on the Drawings, prior to trenching or excavating for any pipe or structures, to determine actual elevations. New pipelines shall be laid to such grade as to clear all existing facilities, which are to remain in service for any period subsequent to the construction of the run of pipe involved.
7. The Contractor's attention is directed to the requirements of Government Code Section 4216.2 ( c) which provides: “When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority 526
Ontario Grand Park Rough Grading -61- SECTION 00700 – GENERAL CONDITIONS
subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and t ime or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.” The Contractor shall notify the Engineer in advance of this meeting.
C. Utility Relocation and Repair
1. If interferences occur at locations other than those indicated in the Contract Documents with reasonable accuracy, the Contractor shall notify the Engineer in writing. The Engineer will supply a method for correcting said interferences in accordance with the responsibilities of this section and Government Code Section 4215. To the extent any delay is caused thereby, Contractor shall submit a notice of delay within five (5) Days of discovery of the circumstances giving rise to the delay in accordance with Article 9.1 Change Orders and Time Extensions.
2. Care shall be exercised by the Contractor to prevent damage to adjacent existing facilities and public or private works; where equipment will pass over these obstructions, suitable planking shall be placed. If high priority subsurface installations are damaged and the operator cannot be contacted, the Contractor shall call 911 emergency services.
3. The City will compensate the Contractor for the costs of locating and repairing damage not due to the failure of the Contractor to exercise reasonable care, and for removing or relocating such main or trunk line utility facilities not indicated in the Contract Documents with reasonable accuracy, and for the cost of equipment on the Project necessarily idled during such work. The payment for such costs will be made as provided in Article 9.1 Change Orders and Time Extensions. The Contractor shall not be assessed liquidated damages for delay in completion of the Project, when such delay is caused by the failure of the City or utility company to provide for removal or relocation of such utility facilities. Requests for extensions of time arising out of utility relocation or repair delays shall be filed in accordance with Article 9.1 Change Orders and Time Extensions and Article 9.3 Time for Completion and Liquidated Damages.
4. The public utility, where it is the owner of the affected utility, shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price. The right is reserved to the City and the owners of utilities or their authorized agents to enter upon the Work area for the purpose of making such changes as are necessary for the rearrangement of their facilities or for making necessary connections or repairs to their properties.
The Contractor shall cooperate with forces engaged in such work and shall conduct its operations in such a manner as to avoid any unnecessary delay or hindrance to the work being performed by such forces and shall allow the respective utilities time to relocate their facility.
527
Ontario Grand Park Rough Grading -62- SECTION 00700 – GENERAL CONDITIONS
5. When the Contract Documents indicate that a utility is to be relocated, altered or constructed by others, the City will conduct all negotiations with the utility company and the work will be done at no cost to the Contractor, unless otherwise stipulated in the Contract Documents.
6. Temporary or permanent relocation or alteration of utilities desired by the Contractor for its own convenience shall be the Contractor’s responsibility and it shall make arrangements and bear all costs for such work.
D. Construction at Existing Utilities
1. Where the Work to be performed crosses or otherwise interferes with water, sewer, gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor shall perform construction in such a manner so that no damage will result to either public or private utilities. It shall be the responsibility of the Contractor to determine the actual locations of, and make accommodates to maintain, all utilities.
2. Before any utility is taken out of service, permission shall be obtained by the Contractor from the owner. The owner, any impacted resident or business owner and the City Representative will be advised of the nature and duration of the utility outage as well as the Contractor’s plan for providing temporary utilities if required by the owner. The Contractor shall be liable for all damage which may result from its failure to maintain utilities during the progress of the Work, and the Contractor shall indemnify City as required by the Contract Documents from all claims arising out of or connected with damage to utilities encountered during construction; damages resulting from disruption of service; and injury to persons or damage to property resulting from the negligent, accidental, or intentional breaching of utilities.
3. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this work, shall be included in Contractor’s bid and distributed in the schedule of pay Items. No additional compensation shall be made to the Contractor for this work.
7.4 Trenches
A. Trenches Five Feet or More in Depth.
1. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from hazards of caving ground during the excavation of any trench or trenches five feet or more in depth. If such plan varies from shoring system standards established by the Construction Safety Orders of the California Code of Regulations, Department of Industrial Relations, the plan shall be prepared by a California registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations. The Contractor shall designate in writing the “competent person” as defined in Title 8, California Code of Regulations, who shall be present at the Work Site each day that trenching/excavation is in progress. The “competent person” shall prepare and provide daily trenching/excavation inspection reports to the Engineer. 528
Ontario Grand Park Rough Grading -63- SECTION 00700 – GENERAL CONDITIONS
Contractor shall also submit a copy of its annual California Occupational Safety and Health Administration (Cal/OSHA) trench/excavation permit.
B. Excavations Deeper than Four Feet.
1. If the Work involves excavating trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly within three (3) Days, and before the excavation is further disturbed, notify the City in writing of any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous waste, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.
b. Subsurface or latent physical conditions at the site differing from those indicated.
c. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract
2. The City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the Work, shall issue a Change Order under the procedures described in Article
9.1 Change Orders and Time Extensions.
3. In the event that a dispute arises between the City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.
ARTICLE 8 -PROSECUTION OF THE WORK
8.1 Contractor’s Means and Methods.
A. Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.
8.2 Construction Schedule.
A. General Requirements . The schedule shall be prepared by the Construction Manager. Refer to Division 01 for additional information and contract requirement(s). 529
Ontario Grand Park Rough Grading -64- SECTION 00700 – GENERAL CONDITIONS
8.3 Time for Completion and Liquidated Damages
A. T ime for Completion. The time for completion set forth in Article 2 of the C ontract for Construction shall commence: (1) on the date stated in the Notice to Proceed, or (2) if the Notice to Proceed does not specify a commencement date, then on the date of the Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The City is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by the City’s receipt or acceptance of the Contractor’s proposed earlier completion date. Any difference in time between the Contractor’s early completion and the Contract Time shall be considered a part of the Project float. Contractor shall not be entitled to compensation, and the City will not compensate Contractor, for delays which impact early completion. Contractor shall not, under any circumstances, receive additional compensation from the City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date.
B. Li
quidated Damages . If the Work is not completed within the Contract Time(s), it is understood that the City will suffer damage. In accordance with Government Code section 53069.85 and Public Contract Code section 7102, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each calendar day of delay until the Work is fully completed. Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages.
C. I
nclement Weather. Contractor shall abide by the City ’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule. Contractor shall not be entitled to reverse liquidated damages for time extensions resulting from inclement weather.
D. E
xtension of Time. Contractor’s entitlement to an extension of the Contract Time is limited to a City -caused extension of the critical path, reduced by the Contractor’s concurrent delays, and established by a proper time impact analysis. Contractor shall not be charged liquidated damages because of any delays in completion of the Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its Subcontractors or S uppliers). The City shall ascertain the facts and extent of delay and grant extension of time for completing the Work when, in its judgment, the facts justify such an extension. Contractor shall not be entitled to an adjustment in the Contract Times for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor.
E. R everse Liquidated Damages. Consistent with Public Contract Code Section 7102, Contractor will be compensated for damages incurred due to unreasonable delays to the critical path for which the City is responsible. The parties agree that determining Contractor’s exact delay damages are and will continue to be impracticable and extremely difficult. As such, for each calendar day in excess of 530
Ontario Grand Park Rough Grading -65- SECTION 00700 – GENERAL CONDITIONS
the time for completion set forth in Article 2 of the Contract for Construction, the City shall pay to the Contractor the sum stipulated in the Contract per day. Such amount shall constitute the only payment allowed for any City -caused delays and shall necessarily include all overhead, all profits, all administrative costs, all bond costs, all labor, materials, equipment and rental costs and any other costs, expenses and fees incurred or sustained as a result of such delays. Contractor shall not be entitled to reverse liquidated damages for any change in the Work in which Contractor is compensated for overhead and profit through a change in Unit Price Work or a Change Order resulting in a lump sum or allowed mark -up for the additional Work.
The amount of reverse liquidated damages shall be reduced by Contractor’s concurrent delays.
F. Force Majeure . In accordance with subparagraphs “D” and “E” above, the Contractor shall not be charged liquidated damages, and the City shall not be responsible, for any delays resulting from a Force Majeure Event. If a delay to the critical path results from a Force Majeure Event, the Contractor will be entitled to a time extension but will not receive an adjustment to the Contract Price or any other compensation. Such a non-compensable adjustment shall be Contractor’s sole and exclusive remedy for such delays.
G. N
o Damages for Reasonable Delay. The City’s liability to Contractor for delays for which the City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable City delay shall be based on actual costs only, no proportions or formulas shall be used to calculate any delay damages.
H. P
rocedure for Time Extensions and Delay Damages. Contractor shall not be entitled to any extension of time or any reverse liquidated damages unless Contractor properly notices the delay and adjustment to compensation and requests a Change Order in accordance with Article 9.1 Change Orders and Time Extensions .
Contractor’s failure to timely and fully comply with the Change Order procedures in the Contract Documents shall constitute a waiver of Contractor’s right to a time extension or reverse liquidated damages.
8.4 C
ontractor’s Responsibility for Work.
A. Until the acceptance of the Work by the Engineer as evidenced in writing, it shall be under the charge and care of the Contractor. The Contractor shall take every necessary precaution against injury or damage to any part thereof by the action of the elements or from any cause whether arising from the execution or non-execution of the Work. The Contractor shall rebuild, repair, restore and make good at its own expense all injuries or damages to any portion of the Work before its completion and acceptance. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City will pay for repair or restoration to damaged Work in excess of 5% of the total Bid. 531
Ontario Grand Park Rough Grading -66- SECTION 00700 – GENERAL CONDITIONS
8.5 CITY’S RIGHT TO CARRY OUT THE WORK DUE TO PARTIAL DEFAULT IN A SPECIFIC SEGREGATED AREA OF WORK (48 HOUR NOTICE TO CURE AND
CORRECT)
If the Contractor Defaults or neglects to carry out the Work in accordance with the Contract Documents, the City may provide forty -eight (48) hour written notice to cure (a shorter period of time in the case of Emergency or a critical path activity delay) Contractor’s Partial Default in a specific segregated area of work. The City’s right to issue a Partial Default of the Contractor’s Work and take over that segregated area of Work includes, but is not limited to:
1. Failure to supply adequate workers on the entire Project or any part thereof;
2. Failure to supply a sufficient quantity of materials;
3. Failure to perform any provision of this Contract;
4. Failure to comply with safety requirements, or due to Contractor is creation of an unsafe condition;
5. Cases of bona fide emergency;
6. Failure to order materials in a timely manner;
7. Failure to prepare Deferred Approval items or Shop Drawings in a timely manner;
8. Failure to comply with Baseline or Updated Schedule, meet critical Milestones which would result in a delay to the critical path, or delay the Contract Time;
9. Failure to comply with the Subletting and Subcontracting Fair Practices, Public Contract Code section 4100, et seq.
10. Failure to meet the requirements of the Americans with Disabilities Act;
11. Failure to complete Punch List work;
12. Failure to proceed on an Immediate Change Directive;
13. Failure to correct a Notice of Deviation.
If during the forty eight (48) hour period, the Contractor fails to Cure and correct the deficiency noted in the 48 hour notice of Partial Default with diligence and promptness, the City may correct such deficiencies without prejudice to other remedies the City may have, including a Termination for Cause as set forth herein. If there are inadequate funds remaining the Project balance or in the Retention Escrow to address at least 150% of the costs set forth in Article 3 in Contract For Construction, the City may copy the Surety on the written notice of Partial Default. If a notice to the Surety is provided, except in the cases of emergency or critical path delay, the Surety has the option to take over and complete the Work described in the written notice if Surety personally delivers notice to City that it intends to perform such work. In the case where written 532
Ontario Grand Park Rough Grading -67- SECTION 00700 – GENERAL CONDITIONS
notice has been provided, the City shall allow Surety seven (7) days to perform the Work.
8.6 Occupancy.
A. The City reserves the right to occupy or utilize any portion of the Work at any time before completion, and such occupancy or use shall not constitute acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.
8.7 Securities for Money Withheld
A. Pursuant to section 22300 of the Public Contract Code of the State of California, Contractor may request the City to make retention payments directly to an escrow agent or may substitute securities for any money withheld by the City to ensure performance under the contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City or with a state or federally chartered bank as the escrow agent who shall return such securities to Contractor upon satisfactory completion of the contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in section 22300 of the Public Contract Code.
8.8 The City’s Right to Suspend/Terminate the Contract
A. Suspension of Work by the City
1. The City may, at its sole option, decide to suspend at any time the performance of all or any portion of the Work by notice in writing to Contractor. Such notice of suspension of Work will designate the amount and type of plant, labor, and equipment to be committed to the Project during the period of suspension.
Contractor shall use its best efforts to utilize its plant, labor, and equipment in such a manner as to minimize costs associated with suspension.
2. Upon receipt of any such notice, Contractor shall, unless the notice requires otherwise:
a. Immediately discontinue Work on the date and to the extent specified in the notice;
b. Place no further orders or subcontracts for material, services, or facilities with respect to suspended Work other than to the extent required in the notice; c. Promptly make every reasonable effort to obtain suspension upon terms satisfactory to the City’s Representative of all orders, subcontracts, and rental agreements to the extent they relate to performance of Work suspended; and d. Continue to protect and maintain the Work including those portions on which Work has been suspended.
3. Except as provided by this Article, as full and complete compensation for such suspension, Contractor shall be granted an adjustment in the Contract Price based 533
Ontario Grand Park Rough Grading -68- SECTION 00700 – GENERAL CONDITIONS
on a negotiated daily rate that reflects the Contractor’s actual costs associated with the demobilized condition of the Site and an extension of the Contract Times equal to the number of days performance of Work is suspended; provided, however, that no adjustment of Contract Price or extension of Contract Times shall be granted if the suspension results from Contractor's non-compliance with the requirements of the Contract.
B. Termination for Cause by the City:
1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the Work or any separable part thereof with such diligence as will insure its completion within the time specified by the Contract Documents, or any extension thereof, or fails to complete such Work within such time, or if the Contractor should be adjudged a bankrupt, or if it should make a general assignment for the benefit of its creditors, or if a receiver should be appointed on account of its insolvency, or the Contractor or any of its subcontractors should violate any of the provisions of this Contract, the City may serve written notice upon the Contractor and its surety of the City's intention to terminate this Contract. This notice of intent to terminate shall contain the reasons for such intention to terminate this Contract, and a statement to the effect that the C ontractor's right to perform this Contract shall cease and terminate upon the expiration of ten (10) Days unless such violations have ceased and arrangements satisfactory to the City have been made for correction of said violations.
2. After expiration of the ten (10) Day period, the City may terminate the Contract by providing a Notice of Termination to the Contractor. The City may take over and complete the Work by any method it may deem appropriate, including enforcement of the Project performance bond. Contractor and its surety shall be liable to the City for any excess costs or other damages incurred by the City to complete the Work. If the City takes over the Work, the City may, without liability for so doing, take possession of and utilize in completing the Work such materials, appliances, plant, and other property belonging to the Contractor as may be on the Site.
3. Upon termination, Contractor shall not be entitled to receive any further payment from the City, except for Work which was duly performed prior to the effective date of the Notice of Termination. Contractor shall submit an invoice for final payment within thirty (30) Days of the effective d ate of the Notice of Termination. The City may withhold from final payment up to 150% of any disputed amounts, including any amounts which may be necessary to repair defective Work, complete unfinished Work, or are otherwise occasioned by Contractor’s failure to perform its duties under the Contract.
C. Termination for Convenience by the City:
1. The City may terminate performance of the Work called for by the Contract Documents in whole or, from time to time, in part, upon ten (10) Days written notice if the City determines that a termination is in the City's interest.
2. The Contractor shall terminate all or any part of the Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the 534
Ontario Grand Park Rough Grading -69- SECTION 00700 – GENERAL CONDITIONS
convenience of the City, the extent of termination, and the effective date of such termination.
3. After receipt of Notice of Termination, and except as directed by the City's Representative, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this termination for convenience clause, immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents.
c. Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Document is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) Days from the effective date of the Notice of Termination, all of the usual documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the effective date of the Notice of Termination. Any documentation substantiating costs i ncurred by the Contractor solely as a result of the City's exercise of its right to terminate this Contract pursuant to this clause, which costs the contractor is authorized under the Contract documents to incur, shall: (1) be submitted to and received by the Engineer no later than 30 Days after the effective date of the Notice of Termination; (2) describe the costs incurred with particularity; and (3) be conspicuously identified as “Termination Costs occasioned by the City's Termination for Convenience.” If the City rejects any costs, Contractor shall be deemed to waive the rejected costs unless Contractor files a Claim within thirty (30) Days of the rejection pursuant to Article 9.2.
g. Contractor shall be entitled to receive only the amounts payable under this Article, and Contractor specifically waives any claim for any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits. The provisions in this Article are in addition to and not in limitation of any other rights or remedies available to the City.
4. Termination of the Contract shall not relieve surety of its obligation for any just claims arising out of or relating to the Work performed.
5. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the 535
Ontario Grand Park Rough Grading -70- SECTION 00700 – GENERAL CONDITIONS
City may immediately order Contractor to cease Work on the Project until such safety or liability issues are addressed to the satisfaction of the City or the Contract is terminated.
6. If the City terminates Contractor for cause, and if it is later determined that the termination was wrongful, such default termination shall automatically be converted to and treated as a termination for convenience. In such event, Contractor shall be entitled to receive only the amounts payable under this section, and Contractor specifically waives any claim for any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits.
8.9 Completion and Acceptance of Work
A. Final Inspection. Upon written notice from Contractor that the entire Work is complete, the Engineer will promptly make a final inspection with the City a nd Contractor and will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies.
B. Fi
nal Acceptance. The acceptance of the Work on behalf of the City will be made by the Engineer. Such acceptance by the City shall not constitute a waiver of defects. After Contractor has, in the opinion of the Engineer, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance, certificates of inspection, Record Documents, and other documents required by the Contract Documents, the City shall execute a Notice of Completion, constituting final acceptance and completion of the Project, except as may be expressly noted.
8.10 W arranty and Guaranty of Work.
A. Contractor hereby warrants that materials and Work shall be completed in conformance with the Contract Documents and that the materials and Work provided will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or replace, at the discretion of the City, any or all Work that may prove to be defective in its workmanship, materials furnished, methods of installation or fail to conform to the Contract Document requirements together with any other Work which may be damaged or displaced by such defect(s) within a period of one (1) year (or as otherwise indicated in the Contract Documents or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) from the date of the Notice of Completion of the Project without any expense whatever to the City, ordinary wear and tear and unusual abuse and neglect excepted. Contractor shall be required to promptly repair or replace defective equipment or materials, at Contractor’s option. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor.
B. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one (1) year period, commencing with the 536
Ontario Grand Park Rough Grading -71- SECTION 00700 – GENERAL CONDITIONS
date of acceptance of such corrected Work. The reinstatement of the one (1) year warranty shall apply only to that portion of work that was corrected. Contractor shall perform such tests as th e City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. In the event of Contractor’s failure to comply with the above-mentioned conditions within ten (10) Days after being notified in writing of required repairs, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non- conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder immediately upon demand.
C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City all warranties that would be given in normal commercial practice and assign to the City any and all manufacturer’s or installer’s warranties for equipment or materials not manufactured by Contractor and provided as part of the Work, to the extent that such third-party warranties are assignable and extend beyond the warranty period set forth in this Article. Contractor shall furnish the City with all warranty and guarantee documents prior to final acceptance of the Project by the City as required.
D. When specifically indicated in the Contract Documents or when directed by the Engineer, the City may furnish materials or products to the Contractor for installation.
In the event any act or failure to act by Contractor shall cause a warranty applicable to any materials or products purchased by the City for installation by the Contractor to be voided or reduced, Contractor shall indemnify the City from and against any cost, expense, or other liability arising therefrom, and shall be responsible to the City for the cost of any repairs, replacement or other costs that would have been covered by the warranty but for such act or failure to act by Contractor.
E. The Contractor shall remedy at its expense any damage to City-owned or controlled real or personal property.
F. The City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days after being notified commence and perform with due diligence all necessary Work. If the Contractor fails to promptly remedy any defect or damage, the City shall have the right to replace, repair or otherwise remedy the defect, or damage at the Contractor’s expense.
G. In the event of any emergency constituting an immediate hazard to health, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, the City may undertake at Contractor ’s expense, and without prior notice, all Work necessary to correct such condition.
H. Acceptance of Defective Work.
1. If, instead of requiring correction or removal and replacement of d efective Work, the City prefers to accept it, the City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to the City ’s evaluation of and 537
Ontario Grand Park Rough Grading -72- SECTION 00700 – GENERAL CONDITIONS
determination to accept such defective Work and for the diminished value of the Work. If any acceptance of Defective Work occurs prior to release of the Project retention, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and the City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work and all costs incurred by the City. If the acceptance of defective occurs after release of the Project retention, an appropriate amount will be paid by Contractor to the City.
I. The City May Correct Defective Work
1. If Contractor fails within a reasonable time after written notice from the City to correct Defective Work, or to remove and replace rejected Work as required by the City, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, the City may, after seven (7) Days written notice to Contractor, correct, or remedy any such deficiency.
2. In connection with such corrective or remedial action, the City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, take possession of Contractor’s tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which the City has paid Contractor but which are stored elsewhere. Contractor shall allow the City, and the agents, employees, other contractors, and consultants of each of them, access to the Site to enable the City to exercise the rights and remedies to correct the Defective Work.
3. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by the City correcting the Defective Work will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and the City shall be entitled to an appropriate decrease in the Contract Price. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of defective Work.
4. If the Change Order is executed after all payments under the Contract have been paid by the City and the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to the City. If the Change Order is executed after release of the Project retention, an appropriate amount will be paid by Contractor to the City. Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to the City correcting Defective Work.
J. Nothing in the warranty or in the Contract Documents shall be construed to limit the rights and remedies available to the City at law or in equity, including, but not limited to, Code of Civil Procedure section 337.15.
538
Ontario Grand Park Rough Grading -73- SECTION 00700 – GENERAL CONDITIONS
ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION
9.1 Change Orders and Time Extensions
All changes to the Contract, including compensation increases and time extensions, shall be through a written Change Order in accordance with this Article. The City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, and Contractor’s compensation and the time for completion shall be adjusted accordingly. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions, and provisions of the original Contract. Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done. No dispute, disagreement, or failure of the parties to reach agreement on the terms of the C hange Order shall relieve the Contractor from the obligation to proceed with performance of the Work, including Additional Work, promptly and expeditiously.
Any alterations, extensions of time, Additional Work, or any other changes may be made without securing consent of the Contractor’s surety or sureties.
A. Change in Contract Procedures
1. City Directive. The City may direct changes in the Work by delivering a written directive. To the extent the work directive results in a change to compensation or time, Contractor must timely request a Change Order and comply with all Change Order procedures in accordance with this A rticle. Notwithstanding issuance of a work d irective, Contractor’s failure to timely request a Change Order shall constitute a waiver by Contractor of any adjustment to compensation or time extension for Work performed under the directive . The City shall not be liable to Contractor for Work performed or omitted by Contractor in reliance on verbal orders.
2. C ontractor’s Notice of Change/Delay . If Contractor intends to initiate a Change Order Request, then Contractor shall provide the City with written notice of the underlying facts and circumstances that gave rise to the proposed change within the following times:
a. If due to unknown subsurface or latent physical conditions, within three (3) Days from the discovery date or prior to the alterations of the conditions, whichever is earlier.
b. If due to a Force Majeure Event, as soon as reasonably practicable under the conditions, which shall be no l onger than three (3) Days from the date the Contractor discovers that the Force Majeure Event gives rise to a change, unless that the conditions are suc h that notice within three (3) Days is not possible or practicable.
c. If due to any other matter that may involve an adjustment to the Contract Time or the Contract Price, within seven (7) days from the discovery date.
To be considered valid and complete, the notice of change/delay shall include a general statement of the circumstances giving rise to the notice of change/delay and a reasonable order of magnitude estimate of the additional costs and/or time. 539
Ontario Grand Park Rough Grading -74- SECTION 00700 – GENERAL CONDITIONS
If the circumstances give rise to both a cost adjustment and time extension, Contractor shall submit the notice of change and notice of delay concurrently.
3. Request for Change in Compensation and/or Extension of Time. Contractor shall submit a Change Order Request for any adjustment to Contractor’s compensation and/or any extension of time. The Change Order Request shall be made prior to incurring any expense and w ithin fourteen (14) Days from either Contractor’s notice of change/delay or the City’s directive ordering the change. The Change Order Request shall include all of the following information (unless inapplicable to the change):
a. A detailed description of the circumstances giving rise to the request; b. A complete itemized cost proposal, including itemized pricing for first tier Subcontractors;
c. Supporting documentation for all costs;
d. A time impact analysis showing the impact of the delay to the critical path to completion;
e. If any added costs or information cannot be determined at the time of the Change Order Request, the reason the costs or information cannot be determined at the time; and
f. Certification to the accuracy of the Change Order R equest under penalty of perjury.
For any costs or information that cannot be determined at the time Contractor submits the Change Order Request, Contractor shall submit to the City notice of the costs or information and all supporting documentation within five (5 ) Days of when the costs or other information become subject to determination.
4. City’s Final Decision on Change Order; Ordered Changes. If the City denies the Change Order Request or disagrees with the proposal submitted by Contractor, it will notify the Contractor, and the City will provide its opinion of the appropriate price and/or time extension. If no agreement can be reached, the City shall have the right to order the Work performed on a time and materials basis or to issue a unilateral Change Order setting forth the City’s determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work.
5. Ti me and Material Charges. The City shall also have the right to order changes in the Work to be performed promptly by the Contractor on a time and materials basis or to issue a unilateral Change Order setting forth the City’s determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. The City’s determination shall become final and binding if the Contractor fails to submit a Claim in writing to the City within fourteen (14) Days of the issuance of the unilateral Change Order, disputing the terms of the unilateral Change Order and providing such supporting documentation for its position as the City may reasonably require.
540
Ontario Grand Park Rough Grading -75- SECTION 00700 – GENERAL CONDITIONS
6. Contractor’s Waiver of Further Relief. CONTRACTOR’S FAILURE TO PROVIDE
A COMPLETE AND TIMELY NOTICE OF CHANGE/DELAY AND/OR CHANGE
ORDER REQUEST, OR TO COMPLY WITH ANY OTHER REQUIREMENT OF
THIS ARTICLE, SHALL CONSTITUTE A WAIVER BY CONTRACTOR OF THE
RIGHT TO A CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH
CIRCUMSTANCES AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE
OR RECOVERY BY REASON OF OR RELATED TO SUCH CHANGE BY
MEANS OF THE CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY
OTHER LEGAL PROCESS OTHERWISE PROVIDED FOR UNDER
APPLICABLE LAWS.
Contractor recognizes and acknowledges that timely submission of a formal written notice of c hange/delay and Change Order R equest, whether or not the circumstances of the change may be known to the City or available to the City through other means, is not a mere formality but is of crucial importance to the ability of the City to promptly identify, prioritize, evaluate and mitigate the potential effects of c hanges. Any form of informal notice, whether verbal or written (including, without limitation, statements in requests for information, statements in Submittals, statements at any job meeting or entries on monthly reports, daily logs or job meeting minutes), that does not strictly comply with the formal requirements of this Article, shall accordingly be insufficient.
7. Change Order Format
a. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in compensation or extension of time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.
b. The City may designate the forms to be used for notices, requests, and Change Orders. If so designated, Contractor may only use such forms. Contractor shall not reserve a right to assert impact costs, extended job site co sts, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the Change Order. No Claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s Change Order form in an attempt to reserve additional rights.
B. Determining Adjustments to Compensation.
1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work subject to a Change Order except as expressly set forth in this Article. The mark- up added in instances of A dditional Work shall constitute the entire amount of profit, any mark-ups, any field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment idle time for such Work.
2. Un
it Price Change Orders. When the actual quantity of a Unit Price Work item varies from the Bid Schedule, compensation for the change in quantity will be calculated by multiplying the actual quantity by the unit price. This calculation may 541
Ontario Grand Park Rough Grading -76- SECTION 00700 – GENERAL CONDITIONS
result in either an additive or deductive Change Order. Bid items included on the Bid Schedule may be deducted from the Work in their entirety without any negotiated extra costs. Because Unit Price Work includes overhead and profit as determined by Contractor at the time of its Bid submission, no mark up or deduction for overhead and profit will be allowed.
3. Lump Sum Change Orders. Whenever possible, any changes affecting compensation shall be in a lump sum mutually agreed by the Contractor and the City.
4. Ti me and Materials Change Orders. The City may direct the Contractor to proceed with the Additional Work with payment to be made on the basis of actual cost of the labor and materials required to complete the Additional Work. If the Project is federally funded, a time and materials Change Order shall only be issued after a determination that no other Change Order is suitable and the Change Order shall include a ceiling price that the Contractor exceeds at its own risk.
5. Feder
ally Funded Projects. For any change in price to the Contract, general and administrative expenses shall be negotiated and must conform to the cost principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be negotiated as a separate element of the cost. To establish a fair and reasonable profit, consideration must be given to the complexity of the Additional W ork to be performed, the risk borne by the Contractor, the Contractor's investment, the amount of subcontracting, the quality of its record of past performance, and industry profit rates in the surrounding geographical area for similar work.
6. A
llowed Costs. Estimates for lump sum quotations and accounting for time -and- material work shall be limited to direct expenditures necessitated specifically by the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the Additional Work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from federal, state or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the Additional Work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental.
b. M
aterials . The cost of materials reported shall be at the lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight and delivery. Materials costs shall be based upon supplier or manufacturer’s invoice.
c. Tool
and Equipment Use. Regardless of ownership, the rates to be used in determining equipment use shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, at the time the work is pe rformed.
The Contractor shall furnish cost data supporting the establishment of the rental rate. The rental rate to be applied for use of each items of equipment 542
Ontario Grand Park Rough Grading -77- SECTION 00700 – GENERAL CONDITIONS
shall be the rate resulting in the least total cost to the City for the total period of use. The City shall the make the final determination as to an equitable rental rate for the equipment. No payment will be made for the use of small tools, which have a replacement value of $1,000 or less.
i. The rental time to be paid for equipment shall be the time the equipment is in productive operation on the Additional Work being performed. Rental time will not be allowed while equipment is inoperative due to breakdowns. ii. All equipment shall, in the opinion of the City, be in good working condition and suitable for the purpose for which the equipment is to be used.
Equipment with no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer.
iii. Before construction equipment is used on any Additional Work , the Contractor shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the City , in duplicate, a description of the equipment and its identifying number. iv. When hourly rates are listed, any part of an hour less than 30 minutes of operation shall be considered to be 1/2-hour of operation, and any part of an hour greater than 30 minutes will be considered one hour of operation.
When daily rates are listed, any part of a day less than 4 hours operation shall be considered to be 1/2-day of operation.
d. Allowed Mark-up. The allowed mark -up for any and all overhead (including supervision and home and field office costs) and profit on work added to the Contract shall be determined in accordance with the following provisions:
i. “ Net Cost” is defined as the actual costs of labor, materials and tools and equipment only, excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and Subcontractors at cost only, without mark-up. Contractor shall provide the City with documentation of the costs, including but not limited to payroll records, invoices, and such other information as the City may reasonably request.
ii. For Work performed by the Contractor’s forces the allowed mark-up shall not exceed fifteen (15%) percent of labor costs, ten percent (10%) of material costs, and ten percent (10%) of the cost of t ools and equipment use.
iii. For Work performed by a Subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the S ubcontractor’s Net Cost of the Work to which the Contractor may add up to five percent (5%) of the Subcontractor’s Net Cost.
iv. For Work performed by a sub-subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the sub - subcontractor’s Net Cost for Work to which the Subcontractor and 543
Ontario Grand Park Rough Grading -78- SECTION 00700 – GENERAL CONDITIONS
Contractor may each add up to an additional five percent (5%) of the Net Cost of the lower tier subcontractor.
v. No additional mark-up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by the City exceed twenty-five percent (25%) of the Net Cost as defined herein, of the party that performs the Work.
vi. Calculation of the mark-up will be subject to the limitations above and to calculation as further detailed in (b)(B)(5) above.
d. Documentation of Time-and-Material Costs.
i. T&M Daily Sheets. Contractor MUST notify the Construction Manager of the assigned manpower, equipment and Work expectations prior to the commencement of the T&M work. Contractor must submit timesheets, materials invoices, records of equipment hours, and records of rental equipment hours to the City’s for an approval signature each day that Work is performed on a time-and-material basis. This process to continue until all T&M work is completed. If the Contractor or their Subcontractor has not properly notified the Construction Manager as stated above, Contractor concedes to cost as determined by the Construction Manager.The Construction Manager’s signature on time sheets only serves as verification that the Work was performed and is not indicative of the City’s agreement to Contractor’s entitlement to the cost.
ii. T
&M Summary Sheet. Contractor shall submit a T&M Summary Sheet, which shall include total actual costs, within five (5) Days following completion of Additional Work on a time-and-material basis.
Contractor’s total actual cost shall be presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and any other costs, along with documentation supporting the costs. Contractor’s failure to submit the T&M Summary Sheet within five (5) Days of completion of the Additional Work will result in Contractor’s waiver for any reimbursement of any costs associated with the Additional Work. e. E
xcluded Costs. The following costs or any other home or field office overhead costs, all of which are to be considered administrative costs covered by the Contractor’s mark-up, shall not be allowed costs and shall not be included in any lump sum proposals or time-and-materials invoices:
(i) O verhead Cost. Payroll costs and other compensation of Contractor’s officers, executives, principals, general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, timekeepers, clerks, and other personnel employed by Contractor whether at the Site or in Contractor’s principal office or any branch office, material yard, or shop for general administration of the Work; (ii) O
ffice Expenses . Expenses of Contractor’s principal and branch offices; 544
Ontario Grand Park Rough Grading -79- SECTION 00700 – GENERAL CONDITIONS
(iii) Capital Expenses. Any part of Contractor’s capital expenses, i ncluding interest on Contractor’s capital employed for the Additional Work and charges against Contractor for delinquent payments;
(iv) N egligence. Costs due to the negligence of Contractor or any Subcontractor or Supplier, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including without limitation the correction of Defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property; (v) S
mall Tools . Cost of small tools valued at less than $1,000 and that remain the property of Contractor;
(vi) A dministrative Costs . Costs associated with the preparation of Change Orders (whether or not ultimately authorized), cost estimates, or the preparation or filing of Claims;
(vii) A nticipated Lost Profits . Expenses of Contractor associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings, or unpaid retention;
(viii) H ome Office Overhead . Costs derived from the computation of a “home office overhead” rate by application of the Eichleay, Allegheny , burden fluctuation, or other similar methods;
(ix) S pecial Consultants and Attorneys . Costs of special consultants or attorneys, whether or not in the direct employ of Contractor, employed for services specifically related to the resolution of a Claim, dispute, or other matter arising out of or relating to the performance of the Additional Work. (x) Oth er . Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in the Contract Documents; including but not limited to: s ubmittals, drawings, field drawings, shop drawings, including submissions of drawi ngs; field inspection; general s uperintendence; computer services; reproduction services; salaries of project engineer, superintendent, timekeeper, storekeeper, and secretaries; janitorial services; small tools , incidentals and consumables; t emporary on-site facilities (o ffices, telephones, high speed internet access, plumbing, electrical power, lighting; platforms, fencing, water ); surveying; estimating; protection of work; handling and disposal fees; final cleanup; other incidental work; related warranties; insurance and bond premiums.
(xi) C
omplianc e with Federal Cost Principles. If the Project is federally funded, any costs that are not allowable, reasonable and allocable to the Project, under generally accepted accounting principles and the applicable federal requirements.
545
Ontario Grand Park Rough Grading -80- SECTION 00700 – GENERAL CONDITIONS
9.2 Procedure for Resolving Claims.
Contractor shall timely comply with any and all requirement of the Contract Documents pertaining to notices and requests for changes to the Contract Time or Contract Price, including but not limited to all requirements of Article 9.1, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely request a change to the time for completion or Contractor’s compensation, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the Contract or at law.
A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non- binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code.
This Article shall be construed to be consistent with all applicable law, including but not limited to these statutes.
B. Cla
ims. For purposes of this Article, “Claim” means a separate demand by the Contractor for:
1. An adjustment to the time for completion including, without limitation, for relief from damages or penalties for delay assessed by the City;
2. Payment by the City of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled; or
3. An amount the payment of which is disputed by the City.
A “Claim” does not include any demand for payment for which the Contractor has failed to provide notice, request a C hange Order, or otherwise failed to follow any procedures contained in the Contract Documents.
C. Filing Claims. Claims governed by this Article may not be filed unless and until the Contractor completes any and all requirements of the Contract Documents pertaining to notices and requests for changes to the Contract Time or Contract Price, and Contractor’s request for a change has been denied in whole or in part.
Claims governed by this Article must be filed no later than thirty (30) Days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the City and shall include on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The Claim shall include all information and documents necessary to substantiate the Claim, including but not limited to those identified below. Nothing in this Article is intended to extend the time limit or supersede notice requirements otherwise provided by Contract Documents. Failure to follow such contractual requirements shall bar any Claims or subsequent proceedings for compensation or payment thereon.
546
Ontario Grand Park Rough Grading -81- SECTION 00700 – GENERAL CONDITIONS
D. Documentation. The Contractor shall submit all Claims in the following format:
1. Summary description of Claim including basis of entitlement, merit and amount of time or money requested, with specific reference to the Contract Document provisions pursuant to which the Claim is made
2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other
3. Chronology of events and correspondence
4. Narrative analysis of Claim merit
5. Analysis of Claim cost, including calculations and supporting documents
6. Time impact analysis in the form required by the Contract Documents or, if the Contract Documents do not require a particular format, C PM format, if an adjustment of the Contract Time is requested
E. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall conduct a reasonable review of the Claim and, within a period not to exceed 45 Days, shall provide the Contractor a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the Claim will be processed and made within 60 Days after the City issues its written statement.
1. If the Cit y needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the Claim, and the City’s governing body does not meet within the 45 Days or within the mutually agreed to extension of time following receipt of a Claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three (3) Days following the next duly publicly noticed meeting of the City ’s governing body after the 45- Day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
2. Within 30 Days of receipt of a Claim, the City may request in writing additional documentation supporting the Claim or relating to defenses or Claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the City and the Contractor. The City’s written response to the Claim, as further documented, shall be submitted to the Contractor within 30 Days (if the Claim is 547
Ontario Grand Park Rough Grading -82- SECTION 00700 – GENERAL CONDITIONS
less than $50,000, within 15 Days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.
F. Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 Days of receipt of the City ’s response or within 15 Days of the City’s failure to respond within the time prescribed, respectively, and demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 Days for settlement of the dispute.
G. M ediation. Within 10 business days following the conclusion of the meet and confer conference, if the Claim or any portion of the Claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the Claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within 60 Days after the City issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The public entity and Contractor shall mutually agree to a mediator within 10 busi ness days after the disputed portion of the Claim has been identified in writing, unless the parties agree to select a mediator at a later time.
1. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
2. For purposes of this Article, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this Article.
3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
4. The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved Claims shall be considered jointly in a single mediation, unless a new unrelated Claim arises after mediation is completed.
H. Procedures After Mediation. If following the mediation, the Claim or any portion remains in dispute, the Contractor must file a Claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.
For purposes of those provisions, the running of the period of time within which a Claim must be filed shall be tolled from the time the Contractor submits his or her 548
Ontario Grand Park Rough Grading -83- SECTION 00700 – GENERAL CONDITIONS
written Claim pursuant to subdivision (a) until the time the Claim is denied, including any period of time utilized by the meet and confer conference.
I. Civil Actions. The following procedures are established for all civil actions filed to resolve Claims of $375,000 or less:
1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive pleadings, the court shall submit the matter to non- binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of this Contract. The mediation process shall provide for the selection within 15 Days by both parties of a disinterested third person as mediator, shall be commenced within 30 Days of the submittal, and shall be concluded within 15 Days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.
2. If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.
J. Government Code Claim Procedures.
1. This Article does not apply to tort claims and nothing in this Article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commending with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the Government Code.
2. In addition to any and all requirements of the Contract Documents pertaining to notices of and requests for adjustment to the Contract Time, Contract Price, or compensation or payment for Additional Work, disputed Work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City.
3. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to adjustment of the Contract Time or Contract Price for Additional Work, disputed Work, construction claims, and/or changed conditions have been followed by Contractor. If Contractor does not comply with the Government Code claim procedure or the prerequisite contractual requirements, Contractor may not file any action against the City. 549
Ontario Grand Park Rough Grading -84- SECTION 00700 – GENERAL CONDITIONS
4. A Government Code claim must be filed no earlier than the date the Work is completed or the date the Contractor last performs Work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved Claims known to Contractor or that should reasonably by known to Contractor excepting only new unrelated Claims that arise after the Government Code claim is submitted.
K. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the Claim being deemed rejected in its entirety, and shall not constitute a waiver of any rights under this Article.
ARTICLE 10 - MEASUREMENT; PAYMENT
10.1 Cost Breakdown.
A. Lump Sum Work.
1. Contractor shall furnish on forms approved by the City within ten (10) Days of the Notice to Proceed, a schedule of values allocating the entire Contract Price to the various portions of the Work and prepared in such a form and supported by such data to substantiate its accuracy as the Engineer may require. This schedule of values, unless objected to by the Engineer, shall be used as a basis for reviewing the Contractor’s applications for payment. Contractor shall submit the schedule of values prior to submitting its first application for payment, and the City will not issue any payment until it receives and approves the schedule of values. a. Break Down of Schedule of Values. Schedule of Values shall be broken down by:
i. Administration:
a) Bond Premium (not to exceed the bond premium amount) b) General Conditions (not to exceed 8% of the subtotal of the cost of the work)
c) Alternates (each as it applies)
d) Mobilization & Demobilization (not to exceed 2% of contract total) e) Submittals (all submittals on one-line item, not to exceed 2% of contract total)
f) Allowance
g) SWPPP
h) Punch-list (Including all subcontractors, 2.5% of the contract’s total) i) Closeout (Including all subcontractors, 2.5% of the contract’s total)
ii. Site: by Specification Section (if applicable)
a) Material (including subcontractor name)
1) Rough
2) Finish
3) Testing
b) Labor (including subcontractor name)
1) Rough
2) Finish
3) Testing
550
Ontario Grand Park Rough Grading -85- SECTION 00700 – GENERAL CONDITIONS
iii. Building and Floor: by Specification Section (if applicable) a) Material (including subcontractor name)
1) Rough
2) Finish
3) Testing
b) Labor (including subcontractor name)
1) Rough
2) Finish
3) Testing
b. Based on Contractor Bid Costs. The Schedule of Values shall be based on the costs from Contractor’s bid to the City. However, the submission of the Schedule of Values shall not be front loaded so the Contractor is paid a greater value than the value of the Work actually performed and shall not shift funds from parts of the Project that are later to Work that is performed earlier.
c. Purchase of Materials and Equipment and Cost Fluctuations. The Contractor is required to order, obtain, and store materials and equipment sufficiently in advance of its Work at no additional cost or advance payment from City to assure that there will be no delays. Contractor understands that materials fluctuate in value and shall have adequately addressed market fluctuations through agreements with Contractor vendors or by other means. Contractor further understands and incorporates into Contractor’s bid cost any wage rate increases during the Project for the Contractor’s labor force as well as all other Subcontractor and vendor labor forces. City shall not be responsible for market fluctuations in costs or labor rate increases during the Project. Contractor further has incorporated any and all cost increases in areas of Work where there may be schedule variations so that cost increases are not passed through to the City.
B. Unit Price Work.
1. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work multiplied by the estimated quantity of each item as indicated in the Contract. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor ’s overhead and or profit for each separately identified item.
2. Unless otherwise specified, payment will be based on the actual quantities of Work as verified and approved by the Engineer, based on the price per unit as set forth in the Bid.
3. The City or Contractor may initiate a Change Order or Change Order Request to adjust the Contract Price in accordance with Contractor Documents based on 551
Ontario Grand Park Rough Grading -86- SECTION 00700 – GENERAL CONDITIONS
actual quantities of Unit Price Work. The City or Contractor may make a claim for an adjustment in the Unit Price in accordance with the Contract Documents if:
a. the quantity of any item of Unit Price Work performed by Contractor differs by twenty-five percent (25%) or more from the estimated quantity of such item indicated in the Contract; and
b. there is no corresponding adjustment with respect to any other item of Work; and
c. Contractor believes that Contractor is entitled to an increase in unit price as a result of having incurred additional expense or the City believes that the City is entitled to a decrease in unit price and the parties are unable to agree as to the amount of any such increase or decrease.
10.2 Progress Estimates and Payment.
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to Engineer a payment request which shall set forth in detail the value of the Work done for the period beginning with the date Work was first commenced and ending on the end of the calendar month for which the payment request is prepared. Contractor shall include an adjusted list of actual quantities, verified by the Engineer, for unit price items listed, if any, in the Bid. Contractor shall include any amount earned for authorized Additional Work. Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.
B. From the total thus computed, a deduction shall be made in the amount of five percent (5%) for retention, except where the City has adopted a finding that the Work done under the Contract is substantially complex, and then the amount withheld as retention shall be the percentage specified i n the Notice Inviting Bids. From the remainder a further deduction may be made in accordance with Section C below.
The amount computed, less the amount withheld for retention and any amounts withheld as set forth below, shall be the amount of the Contractor’s payment request.
1. First Payment Request. The following items, if applicable, must be completed before the first payment request will be accepted for processing:
a. Executed contract with City;
b. Bond and insurance endorsements received and accepted by City; c. Manpower loading;
d. Submittal Schedule;
e. Copies of authorizations and licenses from governing authorities; f. List of all Subcontractors, with names, license numbers, telephone numbers, and scope of work;
g. Approved Schedule of Values;
552
Ontario Grand Park Rough Grading -87- SECTION 00700 – GENERAL CONDITIONS
h. Copies of necessary permits;
i. Installation of temporary facilities and fencing (if applicable); j. IIPP /Safety Program on file with the Construction Manager; and k. Receipt of critical submittals as noted in 00750 – Special Conditions.
2. Second Payment Request. The second payment request will not be processed until all Submittals and Shop Drawings have been accepted for review by the Architect.
3. All Payment Requests. No payment requests will be processed unless Contractor has submitted / Completed and /or confirmed, but not limited to:
a. Current daily work reports,
b. Current safety meeting minutes,
c. Current as-builts,
d. Current insurance certificates,
e. Current certified payroll,
f. Current SWPPP log / maintenance,
g. Conditional and Unconditional Waivers & Release required by Trade Contractor only,
h. Any other contract requirement(s).
C. The City may withhold a sufficient amount or amounts of any payment or payments otherwise due to Contractor, as in its judgment may be necessary to cover:
1. Payments which may be past due and payable for just claims against Contractor or any Subcontractors for labor or materials furnished in and ab out the performance of work on the Project under this Contract.
2. Defective work not remedied.
3. Failure of Contractor to make proper payments to his Subcontractor or for material or labor.
4. Completion of the Contract if there is a reasonable doubt that the Wor k can be completed for balance then unpaid.
5. Damage to another contractor or a third party.
6. Amounts which may be due the Count for claims against Contractor. 553
Ontario Grand Park Rough Grading -88- SECTION 00700 – GENERAL CONDITIONS
7. Failure of Contractor to keep the Record Drawings up to date.
8. Failure to provide update on construction schedule as required herein.
9. Site cleanup.
10. Failure to comply with Contract Documents.
11. Liquidated damages.
12. Legally permitted penalties.
D. The City may apply such withheld amount or amounts to payment of such claims or obligations at its discretion with t he exception of subsections ( C)(1), (3), and (5) of this Article, which must be retained or applied in accordance with applicable law. In so doing, the City shall be deemed the agent of Contractor and any payment so made by the City shall be considered as a payment made under contract by the City to Contractor and the City shall not be liable to Contractor for such payments made in good faith. Such payments may be made without prior judicial determination of claim or obligations. The City will render Con tractor a proper accounting of such funds disbursed on behalf of Contractor.
E. Upon receipt, the Engineer shall review the payment request to determine whether it is undisputed and suitable for payment. If the payment request is determined to be unsuitable for payment, it shall be returned to Contractor as soon as practicable but not later than seven (7) Days after receipt, accompanied by a document setting forth in writing the reasons why the payment request is not proper. The City shall make the progress payment within 30 Days after the receipt of an undisputed and properly submitted payment request from Contractor, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code section 8132. The number of days available to the City to make a payment without incurring interest pursuant to this paragraph shall be reduced by the number of Days by which the Engineer exceeds the seven (7) Day requirement.
F. A payment request shall be considered properly executed if funds are available for payment of the payment request and payment is not delayed due to an audit inquiry by the financial officer of the City.
G. The City shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.
H. No Waiver No payment by City hereunder shall be interpreted so as to imply that City has inspected, approved, or accepted any part of the Work. Contractor specifically understands that Title 24 Section 4-343 which states:
“It is the duty of the contractor to complete the work covered by his or her contract in accordance with the approved Plans and Specifications, therefore. The Contractor in no way is relieved of any responsibility by the activities of the City, Architect, Constructi on Manager, Engineer, or Inspector in the performance of such duties... In no case, however, shall the instruction of the Architect or registered Engineer be construed to cause 554
Ontario Grand Park Rough Grading -89- SECTION 00700 – GENERAL CONDITIONS
work to be done with is not in conformity with the approved Plans, Specifications, and change orders...”
Notwithstanding any payment, the City may enforce each and every provision of this Contract which includes, but is not limited to, the Performance Bond and Payment Bond. The City may correct any error subsequent to any payment. In no event shall the Contractor or the Surety be released or exonerated from performance under this Contract when the City overpays the Contractor based upon any mistake, inaccuracy, error or falsification in any estimate that is included in any Request for Payment.
10.3 Completion of the Work
A. Close-Out Procedures
1. Incomplete Punch Items. When the Contractor considers the Work Substantially Complete (See Article 1 for definition of Substantially Complete), the Contractor shall prepare and submit to the City a comprehensive list of minor items to be completed or corrected (hereinafter “Incomplete Punch Items” or “Punch List”).
The Contractor and/or its Subcontractors shall proceed promptly to complete and correct the Incomplete Punch Items listed. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Contractor is aware that Title 24 Section 4-343(a) provides:
“RESPONSIBILITIES. IT IS THE DUTY OF THE CONTRACTOR TO
COMPLETE THE WORK COVERED BY HIS OR HER CONTRACT
IN ACCORDANCE WITH THE APPROVED PLANS AND
SPECIFICATIONS. THEREFOR, THE CONTRACTOR IN NO WAY IS
RELIEVED OF ANY RESPONSIBILITY BY THE ACTIVITIES OF THE
CITY, ARCHITECT, ENGINEER, OR INSPECTOR IN THE
PERFORMANCE OF SUCH DUTIES.
2. Punch List Is Prepared Only After the Project Is Substantially Complete. If any of the conditions noted in Article 1 defining Substantial Completion are not met, the Inspector, Architect or City may reject Contractor’s Incomplete Punch Items as premature. If the Architect and Inspector commence review of Incomplete Punch Items, all rights are reserved until the Project actually meets the definition of Substantially Complete. Liquidated Damages, warranties, and other contractual rights are not affected by Incomplete Punch Items unless otherwise addressed in these General Conditions.
Once the Inspector and the Architect determine the Project is Substantially Complete, a Certificate of Substantial Completion shall be issued. The Architect shall prepare a Punch List of items which is an inspection report of the Work, if any, required in order to complete the Contract Documents and ensure compliance with the Approved Plans so the Project may be Completed by the Contractor and final Close- Out is approved. When all Work for the Project is Complete, including Punch Lists and all Work complies with the approved 555
Ontario Grand Park Rough Grading -90- SECTION 00700 – GENERAL CONDITIONS
Contract Documents and Change Orders, the Project has reached Final Completion.
3. Time for Completion of Punch List. Contractor shall only be given a period of no more than twenty (20) days to complete the Punch List for the Project. During the Punch List period, the Contractor’s Superintendent and Project Manager shall remain engaged in the Project and shall not be removed or replaced. If the Punch List is not completed at the end of the Punch List time, then Contractor shall issue a valued Punch List within 5 days after the date the Punch List time ends. If Contractor does not issue such a list, the City or Architect may issue a valued Punch List to the Contractor and withhold up to 150% of the value of the Punch List Work.
a. Extension of Time to Complete Punch List. If Contractor cannot finish the Punch List Work during the time period allotted , the Contractor may make a written request for a Non- Compensable Punch List time exten sion accompanied by an estimate of the number of additional days it will take to complete the Punch List Work for a written consent from the City to allow continued Punch List Work. Punch List time extensions are a maximum of twenty (20) days for each request and must be accompanied by an itemized valued Punch List.
b. If there is no valued Punch List accompanying any request or if Contractor intends to undertake Punch List without the continued support and supervision of its Superintendent and Project Manager, the City, Construction Manager or Architect may issue a valued Punch List, reject the Punch List Time Extension and deduct 150% of the valued Punch List.
4. City Rejection of Written Request for Punch List Time Extensions. T he City has the option of rejecting Punch List Time Extension requests. The City may proceed and deduct the value of remaining Punch List Work. If the City rejects the Punch List Time Extension request, then Contractor shall cease Work on the Project.
5. Punch List Liquidated Damages to Compensate for Added City Project Costs. If the total time utilized for Punch List exceeds forty (40) days [the original twenty (20) day period, plus an additional twenty (20) day period that has been requested in writing], the Contactor shall be charged Liquidated Damages of at least $1,000 per day for continued Punch List Work to partially compensate the Architect, and Construction Manager’s extended time on the Project. This Punch List Liquidated Damage number is based on additional costs for the Architect and Construction Manager to reinspect Punch List items and perform the administration of the Close- out.
6. Starting at sixty (60) days of Punch List (an excessive number of days to complete Punch List), the City shall be entitled to adjust Punch List Liquidated Damages to an estimate of the actual costs incurred to oversee, monitor and inspect the Punch List. If costs exceed $1,000 per day, the anticipated extended contract charges for Architect, Construction Manager, and any other costs that will be incurred due 556
Ontario Grand Park Rough Grading -91- SECTION 00700 – GENERAL CONDITIONS
to the extended Punch List shall be itemized and a daily rate of Punch List Liquidated Damages shall be presented in writing to the Contractor within five (5) days following the receipt of a written request for Punch List Time Extension by the Contractor that extends the Punch List time beyond sixty (60) days. This written notice of actual Punch List Liquidated Damages may be provided to the Contractor at any time following the first written request for Punch List Time extension. The adjusted actual Punch List Liquidated Damage amount shall be applicable as Punch List Liquidated Damages commencing on the fortieth (40th) day of Punch List.
B. Close-Out Requirements for Final Completion of the Project
1. Utility Connections . Buildings shall be connected to water, gas, sewer, and electric services, complete and ready for use. Service connections shall be made and existing services reconnected.
2. As-Builts Up to Date and Complete. The intent of this procedure is to obtain an exact “As-Built” record of the Work upon completion of the project. The following information shall be carefully and correctly drawn on the prints and all items shall be accurately located and dimensioned from finished surfaces of building walls on all As-Built Drawings:
a. The exact location and elevations of all covered utilities, including valves, cleanouts, etc. must be shown on As-Built Drawings
b. Contractor is liable and responsible for inaccuracies in As -Built Drawings, even though they become evident at some future date.
c. Upon completion of the Work and as a condition precedent to approval of Retention Payment, Contractor shall obtain the Inspector’s approval of the “As-Built” information.
d. City may withhold the cost to hire a draftsman and potholing and testing service to complete Record As -Built Drawings at substantial cost if the Contractor does not deliver a complete set of Record As-Built Drawings. This shall result in withholding of between $10,000 to $20,000 per building that does not have a corresponding Record As-Built Drawing.
i. Any Work not installed as originally indicated on Drawings. ii. All Close-Out requirements as noted.
iii. ADA Work that must be corrected to receive certification. iv. Maintenance Manuals. At least thirty (30) days prior to final inspection, three (3) copies of complete operations and maintenance manuals, repair parts lists, service instructions for all electrical and mechanical equipment, and equipment warranties shall be submitted. All installation, operating, and maintenance information and Drawings shall be bound in 8½” x 11” binders. Provide a table of contents in front and all items shall be indexed with tabs. Each manual shall also contain a list of 557
Ontario Grand Park Rough Grading -92- SECTION 00700 – GENERAL CONDITIONS
Subcontractors, with their addresses and the names of persons to contact in cases of emergency. Identifying labels shall provide names of manufactures, their addresses, ratings, and capacities of equipment and machinery.
a) Maintenance manuals shall also be delivered in electronic media for the Project. Any demonstration videos shall also be provided on electronic media.
v. Inspection Requirements. Before calling for final inspection, Contractor shall determine that the following Work has been performed:
b) The Work has been completed.
c) All fire/ life safety items are completed and in working order. d) Mechanical and electrical Work complete, fixtures in place, connected and tested.
e) Electrical circuits scheduled in panels and disconnect switches labeled.
f) Painting and special finishes complete.
g) D oors complete with hardware, cleaned of protective film relieved of sticking or binding and in working order.
h) Tops and bottoms of doors sealed.
i) Floors waxed and polished as specified.
j) Broken glass replaced and glass cleaned.
k) Grounds cleared of Contractor’s equipment, raked clean of debris, and trash removed from Site.
l) Work cleaned, free of stains, scratches, and other foreign matter, replacement of damaged and broken material.
m) Finished and decorative work shall have marks, dirt and superfluous labels removed.
n) Final cleanup.
o) All Work pursuant to the Contract Documents.
p) Furnish a letter to City stating that the City’s Representative or other designated person or persons have been instructed in working characteristics of mechanical and electrical equipment.
10.4 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City a written statement of the final quantities of unit price items for inclusion in the final payment request. The City shall have the right to adjust any estimate of quantity and to correct any error made in any estimate for payment.
B. When the Work has been accepted there shall be paid to Contractor a sum equal to the Contract Price less any amounts previously paid Contractor and less any amounts withheld by the City from Contractor under the terms of the Contract. The final five percent (5%), or the percentage specified in the Notice Inviting Bids where the City has adopted a finding of substantially complete, shall not become due and payable until as required by Public Contract Code section 7107. If the Contractor 558
Ontario Grand Park Rough Grading -93- SECTION 00700 – GENERAL CONDITIONS
has placed securities with the City as described herein, the Contractor shall be paid a sum equal to one hundred percent (100%) of the Contract Price less any amounts due the City under the terms of the Contract.
C. Unless Contractor advises the City in writing prior to acceptance of the final five percent (5%) or the percentage specified in the Notice Inviting Bids where the City has adopted a finding of completion, or the return of securities held as described herein, said acceptance shall operate as a release to the City of all claims and all liability to Contractor for all things done or furnished in connection with this Work and for every act of negligence of the City and for all other claims relating to or arising out of this Work. If Contractor advises the City in writing prior to acceptance of final payment or return of the securities that there is a dispute regarding the amount due the Contractor, the City may pay the undisputed amount contingent upon the Contractor furnishing a release of all undisputed claims against the City with the disputed claims in stated amounts being specifically excluded by Contractor from the operation of the release. No payments, however, final or otherwise, shall operate to release Contractor or its sureties from the Faithful Performance Bond, Labor and Material Payment Bond, or from any other obligation under this Contract.
D. In case of suspension of the Contract any unpaid balance shall be and become the sole and absolute property of the City to the extent necessary to repay the City any excess in the cost of the Work above the Contract Price.
E. Final payment shall be made no later than 60 Days after the date of acceptance of the Work by the City or the date of occupation, beneficial use and enjoyment of the Work by the City including any operation only for testing, start-up or commissioning accompanied by cessation of labor on the Work, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code section 8136.
In the event of a dispute between the City and the Contractor, the City may withhold from the final payment an amount not to exceed 150% of the disputed amount.
F. Within ten (10) Days from the time that all or any portion of the retention proceeds are received by Contractor, Contractor shall pay each of its Subcontractors from whom retention has been withheld each Subcontractor’s share of the retention received. However, if a retention payment received by Contractor is specifically designated for a particular Subcontractor, payment of the retention shall be made to the designated Subcontractor if the payment is consistent with the terms of the subcontract.
ARTICLE 11 -MISCELLANEOUS
11.1 Patents.
A. Contractor shall hold and save the City, Construction Manager, Architect, Engineer, officials, officers, employees, and authorized volunteers harmless from liability of any nature or kind of claim therefrom including costs and expenses for or on account of any patented or unpatented invention, article or appliance manufactured, furnished or used by Contractor in the performance of this Contract. 559
Ontario Grand Park Rough Grading -94- SECTION 00700 – GENERAL CONDITIONS
11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment.
B. Contractor shall make available to the City any of the Contractor’s other documents related to the Project immediately upon request of the City.
C. In addition to the State Auditor rights above, the City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the City, for a period of four (4) years after final payment.
11.3 Notice.
A. All notices shall be in writing and either served by personal delivery or mailed to the other party. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to the City shall be addressed to the City as designated in the Notice Inviting Bids unless the City designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) Days after being sent by first class mail, whichever is earlier. Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party.
11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the Contractor with timely notification of the receipt of any third-party claims relating to the Contract.
The City is entitled to recover reasonable costs incurred in providing such notification.
11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.
11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the rights or title of interest of any or all of this contract without the prior written consent of the City. Any assignment or change of Contractor’s name of legal entity without the written consent of the City shall be void. Any assignment of money due or to 560
Ontario Grand Park Rough Grading -95- SECTION 00700 – GENERAL CONDITIONS
become due under this Contract shall be subject to a prior lien for services rendered or material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.
11.7 Change In Name And Nature Of Contractor’s Legal Entity.
A. Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected on the Contract and all related documents. No change of Contractor’s name or nature will affect the City’s rights under the Contract, including but not limited to the bonds.
11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.
11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any subcontractor, supplier, or other person or organization performing any part of the Work, this Contract shall be governed by the law of the State of California excluding any choice of law provisions.
11.10 Jurisdiction; Venue
A. Contractor and any subcontractor, supplier, or other person or organization performing any part of the Work agrees that any action or suits at law or in equity arising out of or related to the bidding, award, or performance of the Work shall be maintained in the Superior Court of San Bernardino County, California, and expressly consent to the jurisdiction of said court, regardless of residence or domicile, and agree that said court shall be a proper venue for any such action.
11.11 Cumulative Remedies.
A. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Applicable Laws, by special warranty or guarantee, or by other provisions of the Contract Documents.
The provisions of this Article will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply.
561
Ontario Grand Park Rough Grading -96- SECTION 00700 – GENERAL CONDITIONS
11.12 Survival of Obligations.
A. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor.
11.13 Headings.
A. Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions.
11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor and Subcontractors must conform to the following requirements:
1. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or Subcontractor offer and agree to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract.
2. This assignment must be made and become effective at the time the awarding body tenders to Contractor, without further acknowledgment by the parties.
11.15 All Legal Provisions Included
A. Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified by their terms. References to specific laws, rules or regulations in this Contract are for reference purposes only, and shall not limit or affect the applicability of provisions not specifically mentioned. If Contractor observes that drawings and specifications are at variance therewith, he shall promptly notify City in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in Work. If Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to City , he shall bear all costs arising therefrom.
B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA laws, rules and regulations. Contractor shall comply with the Historic Building Code, including, but not limited to, as it relates to the ADA, whenever applicable.
C. Contractor acknowledges and understands that, pursuant to Public Contract Code section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code section 2717(b) in order to supply mined material for this Contract.
562
Ontario Grand Park Rough Grading -97- SECTION 00700 – GENERAL CONDITIONS
D. No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the Work, shall be or become directly or indirectly interested financially in the Contract.
E. All provisions of law required to be inserted in the Contract or Contract Documents pursuant to any Applicable Laws shall be and are inserted herein. If through mistake, neglect, oversight, or otherwise, any such provision is not herein inserted or inserted in improper form, upon the application of either party, the Contract or Contract Documents shall be changed by City, at no increase in Contract Price or extension in Contract Times, so as to strictly comply with the Applicable Laws and without prejudice to the rights of either party hereunder.
563
Ontario Grand Park Rough Grading 98 PLANS AND DRAWINGS
SECTION 00750 – SPECIAL CONDITIONS
The following supplements modify the General Conditions. Where a portion of the General Conditions is modified and or deleted by these Special Conditions, the unaltered portions of the General Conditions shall remain in effect.
Article 4
4.2 Insurance
The Contractor must carry the appropriate insurance limits as identified by Bid Category .
Contractor may choose either Option A or Option B as identified in the tables below.
Commercial
General
Liability
Automobile
Liability
Insurance Umbrella
Contractor’s Pollution
Liability Coverage
Option A: $10,000,000 $5,000,000 $5,000,000/$10,000,000 Option B: $1,00,000 $1,000,000 $22,000,000 $5,000,000/$10,000,000
5.10 Water Quality Management and Compliance
SWPPP to be provided by the Architect
Article 8
8.3 Time for Completion and Liquidated Damages
A. Time for Completion
Project Recognized Holidays:
The project recognizes the following seven (7) holidays ONLY:
1) New Years’ Day,
2) Memorial Day,
3) July 4
th,
4) Labor Day,
5) Thanksgiving Day,
6) the day following Thanksgiving day, and
7) Christmas.
ALL other days in the calendar year is considered a Work Day. Any day that the Contractor recognizes as a holiday that is above and beyond the list noted above, Contractor will be expected to be on- site with the correct crew size. Contractor shall include in their base bid al l cost associated with any additional holidays Contractor and /or their subcontractor recognizes.
In the event a CONTRACTOR does not perform on all scheduled work days in accordance with the baseline or revised construction schedule a determined value of $5 00 per day will be assessed. No make up days will be accepted. This will be in addition to actual project delays and Liquidated Damages.
B. Liquidated Damages.
564
Ontario Grand Park Rough Grading 99 PLANS AND DRAWINGS
Contractor will be liable to the City for Liquidated Damages for each calendar day of delay in the amount of $1,200.
END OF SPECIAL CONDITIONS