April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 1 of 9
OROVILLE CITY COUNCIL
Council Chambers
1735 Montgomery Street
Oroville, CA. 95965
April 21, 2026
REGULAR MEETING
CLOSED SESSION 4:00 PM
OPEN SESSION 4:30 PM
AGENDA
PUBLIC ACCESS AND PARTICIPATION
Please review the options below for ways to participate or observe the Council Meetings.
To Observe the Meeting:
1. Live Feed: https://www.youtube.com/channel/UCAoRW34swYl85UBfYqT7IbQ/
2. Zoom Link: https://zoom.us/j/96870319529?pwd=dW9kMGRZSFo5MFFNQk5wVDUzRkRrZz09
3. Zoom Application: Meeting ID: 968 7031 9529 Passcode: 67684553
4. By Phone: Telephone: 1-669-900-6833 Meeting ID: 968 7031 9529 Passcode: 67684553 To Provide Comment to the Council:
1. Attend the meeting in person
2. Send an Email by 2:00 PM the day before the meeting to [email protected]. All comments emailed will be provided to the Council Members for their consideration.
If you would like to address the Council at this meeting, you are requested to complete the blue speaker request form (located on the wall by the agendas) and hand it to the City Clerk, who is seated on the right of the Council Chamber. The form assists the Clerk with minute taking and assists the Mayor or presiding chair in conducting an orderly meeting. Providing personal information on the form is voluntary. For scheduled agenda items, please submit the form prior to the conclusion of the staff presentation for that item. Council has established time limitations of three (3) minutes per speaker on all items and an overall time limit of thirty minutes for non-agenda items.
If more than 10 speaker cards are submitted for an item, the time limitation would be reduced to one and a half (1.5) minutes per speaker for that item. If more than 15 speaker cards are submitted for non-agenda items, the first 15 speakers will be randomly selected to speak at the beginning of the meeting, with the remaining speakers given an opportunity at the end. (California Government Code §54954.3(b)).
Pursuant to Government Code Section 54954.2, the Council is prohibited from taking action except for a brief response from the Council or staff to statements or questions relating to a non-agenda item.
CALL TO ORDER / ROLL CALL
Council Members: Chuck Reynolds, Scott Thomson, Tracy Johnstone, Janet Goodson, Shawn Webber, Vice Mayor Eric Smith, Mayor David Pittman
1 April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 2 of 9
CLOSED SESSION
The City Council shall hold a Closed Session on the following:
1. Conference with Legal Counsel – The City Council will confer with the City Attorney regarding Existing Litigation pursuant to Government Code § 54956.9) (One Case) Name of Case: Cherokee Properties v. City of Oroville, U.S. District Court, Eastern District of California Case No: 2:26-CV-00371-DMC
2. Pursuant to Government Code section 54957.6, the Council will meet with Labor Negotiators and City Attorney to discuss labor negotiations for the following represented groups: All Units and Contract Employees.
OPEN SESSION
1. Announcement from Closed Session
2. Pledge of Allegiance
3. Corrections/Changes to the Agenda
4. Recusals
5. Adoption of Agenda
RULES OF DECORUM
The Oroville City Council welcomes the public to its meetings and encourages and appreciates public engagement. The City Council expects members of the public to act in a courteous, civil, and respectful manner, and not make personal, slanderous, or profane remarks to any member of the Council, staff, or the general public. The City Council will not tolerate loud, threatening, personal, or abusive language, or disorderly conduct, which disrupts, disturbs, or otherwise impedes the orderly conduct of City Council meetings. Violation of these rules of decorum will result in the meeting being recessed.
PRESENTATIONS AND PROCLAMATIONS
1. PRESENTATION FROM CINDY DANILUKE REGARDING THE ANY GIVEN CHILD (AGC)
PROGRAM
The City Council shall receive a presentation by Cindy Daniluke that provides an overview of the Any Given Child (AGC) program and highlights local efforts to expand arts education opportunities for Oroville-area students through collaborative partnerships.
ACTION REQUESTED -
RECEIVE PRESENTATION AS INFORMATION.
2 April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 3 of 9
2. INVESTMENT UPDATE
The City Council shall receive an investment update from Ryan Midkiff of Building Bridges Financial Advisors, regarding our investment account with Ameriprise Financial.
ACTION REQUESTED -
RECEIVE INVESTMENT INFORMATION.
PUBLIC COMMUNICATION – HEARING OF NON-AGENDA ITEMS
This is the time to address the Council about any item not listed on the agenda. If you wish to address the Council on an item listed on the agenda, please follow the directions listed above.
REPORTS / DISCUSSIONS
1. Council Announcements and Reports
2. Administration Reports
CONSENT CALENDAR
Consent calendar items 1 - 10 are adopted in one action by the Council. Items that are removed will be discussed and voted on immediately after adoption of consent calendar items.
1. RESOLUTION RECOGNIZING MAY 3–9, 2026, AS PUBLIC SERVICE RECOGNITION WEEK The City Council shall consider adopting Resolution No. 9450 recognizing May 3–9, 2026, as Public Service Recognition Week in the City of Oroville.
ACTION REQUESTED -
ADOPT RESOLUTION NO. 9450; AND AUTHORIZE THE MAYOR TO SIGN.
2. AUTHORIZATION TO REPAIR FIRE ENGINE 91
The City Council shall consider authorizing expenditures to repair Fire Engine 91 following damage sustained while responding to a structure fire in early March.
ACTION REQUESTED -
AUTHORIZE FIRE ENGINE 91 REPAIRS, APPROVING A NOT-TO-EXCEED AMOUNT OF $32,812.36, TO BE FUNDED FROM CAPITAL ASSET - OUTSIDE SERVICES. 3 April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 4 of 9
3. MODIFICATIONS TO THE CAL HOME OWNER-OCCUPIED REHABILITATION LOAN
PROGRAM GUIDELINES
The City Council shall consider accepting changes made to the Cal Home Owner-Occupied Rehabilitation Loan Program Guidelines.
ACTION REQUESTED -
ADOPT RESOLUTION NO. 9451 - A RESOLUTION OF THE OROVILLE CITY COUNCIL
AUTHORIZING MODIFICATIONS TO THE CAL HOME OWNER-OCCUPIED REHABILITATION LOAN PROGRAM GUIDELINES.
4. SECOND READING OF ORDINANCE 1895 WITH AD HOC CITIZEN BUSINESS ADVOCACY
COMMITTEE RECOMMENDATIONS REGARDING THE STREAMLINING OF CERTAIN
BUSINESS LICENSE AND PLANNING PERMITS TO REDUCE THE COST AND
PROCESSING TIME FOR APPLICANTS
The City Council shall consider adopting Ordinance No. 1895 with changes to Oroville Municipal Code sections 17.04.060, 17.16.120, 17.16.180, and Tables 17.34.020-1, 17.28.010-1,
17.32.010-1, AND 17.36.010-1, for the purpose of streamlining certain business permits to reduce the time and cost of applying.
ACTION REQUESTED -
ADOPT ORDINANCE NO. 1895 - AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF OROVILLE AMENDING OROVILLE MUNICIPAL CODE SECTIONS 17.04.060, 17.16.120,
17.16.180, AND TABLES 17.34.020-1, 17.28.010-1, 17.32.010-1, AND 17.36.010-1.
5. HOSTING THE TRAVELING EXHIBIT CHINESE PIONEERS: POWER AND POLITICS IN EXCLUSION ERA PHOTOGRAPHS AT THE Oroville CHINESE TEMPLE The City Council shall consider approving the hosting of the traveling exhibition Chinese Pioneers:
Power and Politics in Exclusion Era Photographs at the Chinese Temple Museum from August through October 2026.
ACTION REQUESTED –
APPROVE HOSTING THE TRAVELING EXHIBIT CHINESE PIONEERS: POWER AND
POLITICS IN EXCLUSION ERA PHOTOGRAPHS AT THE CHINESE TEMPLE MUSEUM FROM AUGUST THROUGH OCTOBER 2026.
6. RECERTIFICATION AND ADOPTION OF 2026 SEWER SYSTEM MANAGEMENT PLAN The City Council shall consider adopting Resolution No. 9452 for the recertification and adoption of the 2026 Sewer System Management Plan (SSMP).
ACTION REQUESTED -
ADOPT RESOLUTION NO. 9452 RECERTIFYING AND ADOPTING THE SSMP; AND AUTHORIZE THE MAYOR TO SIGN.
4 April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 5 of 9
7. AGREEMENT WITH STRATEGIC EXPERTS LLC FOR MUNICIPAL UTILITY AND
COMMUNITY CHOICE AGGREGATION ADVISORY SERVICES
The City Council shall consider approving an agreement with Strategic Energy Experts LLC (SEE) to provide advisory services related to the City’s ongoing evaluation of local energy options, including a potential municipal electric utility and/or Community Choice Aggregation (CCA) program. SEE’s role will be limited to advisory support, with the potential to assist in future implementation efforts should the City determine that forming a CCA is financially feasible.
ACTION(S) REQUESTED -
1. APPROVE AGREEMENT WITH STRATEGIC ENERGY EXPERTS LLC; AND
2. AUTHORIZE THE MAYOR TO EXECUTE THE AGREEMENT AND ANY MINOR ADMINISTRATIVE AMENDMENTS.
8. UPDATED JOB DESCRIPTION FOR ASSOCIATE CIVIL ENGINEER TO ASSOCIATE CIVIL
ENGINEER/PROJECT MANAGER
The City Council shall consider updates to the job description of Associate Civil Engineer, adding in responsibilities associated with project management, and renaming the classifications Associate Civil Engineer/Project Manager.
ACTION REQUESTED -
ADOPT THE UPDATED JOB DESCRIPTION FOR ASSOCIATE CIVIL ENGINEER/PROJECT MANAGER (FORMERLY ASSOCIATE CIVIL ENGINEER).
9. SUPPORT LETTER FOR SB 1216 (CABALDON) – HOUSING LEADERSHIP DESIGNATION
PROGRAM
The City Council shall consider approving of a letter of support for SB 1216 (Cabaldon), which establishes a Housing Leadership Designation Program to recognize jurisdictions that demonstrate strong housing production outcomes and provides associated regulatory flexibility.
ACTION REQUESTED -
APPROVE THE LETTER OF SUPPORT FOR SB 1216 (CABALDON); AND AUTHORIZE THE MAYOR TO SIGN AND SUBMIT THE LETTER THROUGH THE STATE’S POSITION LETTER PORTAL.
10. APPROVAL OF APRIL 7, 2026 REGULAR MEETING MINUTES
The City Council shall consider approving the drafted regular meeting minutes from the April 7, 2026 regular City Council meeting.
ACTION REQUESTED -
APPROVE MINUTES AND AUTHORIZE THE MAYOR TO SIGN.
5 April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 6 of 9
REGULAR BUSINESS
11. NORTON STREET REHABILITATION PROJECT UPDATE
The City Council shall receive an update on the Norton Street Rehabilitation project and options for traffic flow.
ACTION REQUESTED -
PROVIDE STAFF DIRECTION ON NORTON STREET TRAFFIC FLOW AND PARKING OPTIONS.
12. RESOLUTION ACKNOWLEDGING VESTED RIGHTS OF PACIFIC COAST PRODUCERS AS
LEGALLY NON-CONFORMING
At the request of Pacific Coast Producers (PCP), the Council shall consider passing Resolution No. 9453 acknowledging the vested rights PCP has to legally continue operations as a legal nonconforming business.
ACTION REQUESTED -
ADOPT RESOLUTION NO. 9453 MEMORIALIZING THE VESTED RIGHTS OF PACIFIC
COAST PRODUCERS TO CONTINUE OPERATIONS AT ITS CURRENT LOCATION AS A
LEGAL NONCONFORMING USE CONSISTENT WITH APPLICABLE PROVISIONS OF THE OROVILLE MUNICIPAL CODE AND CALIFORNIA LAW.
13. FIRE DEPARTMENT COST RECOVERY – MANAGING SERVICE DEMAND The City Council shall receive information and provide direction on a proposed ordinance to establish a Fire Department cost recovery program.
ACTION REQUESTED -
PROVIDE COUNCIL FEEDBACK AND DIRECTION ON THE PROPOSED ORDINANCE AND
DIRECT STAFF TO RETURN WITH A FINALIZED VERSION FOR FORMAL CONSIDERATION.
14. OROVILLE POLICE DEPARTMENT RECOMMENDATIONS FOR INCREASED PRESENCE
IN PARKS
The City Council shall hear recommendations from the Police Department in regard to increasing presence at City parks.
ACTION REQUESTED -
PROVIDE DIRECTION TO STAFF.
6 April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 7 of 9
15. AWARD OF CONSTRUCTION (PHASE II); DESIGN-BUILD ENTITY FOR CORPORATION
YARD PROJECT, MULTI-BUILDING REMODEL AND SITE WORKDESIGN/BUILD PROJECT AT 655 CAL OAK
The City Council shall consider awarding the construction portion (phase II) of the contract with United Building Contractors, Inc (UBC) of Chico for Design/Build Construction Services on the new City of Oroville Corporation Yard.
ACTION REQUESTED -
APPROVE THE CONTRACT WITH UNITED BUILDING CONTRACTORS, INC., AND AUTHORIZE THE MAYOR TO SIGN.
16. NINE-MONTH BUDGET REVIEW
The City Council shall receive a budget review for the nine-months ended March 31, 2026, and consider requested budget adjustments. For this discussion the General Fund and District Tax Fund are combined for budget review.
ACTION REQUESTED -
APPROVE THE STATE BUDGET ADJUSTMENTS FOR FISCAL YEAR 2025-26.
17. PURCHASE OF FIVE PATROL VEHICLES
The Police Department plans to budget for the purchase of four (4) new patrol vehicles for the 26/27 budget year and we will replace one vehicle that was damaged beyond repair. While four will be budgeted for next year and the 5th will be purchased via insurance funds, the Police Department is asking for approval to get on the list to pre-order the vehicles in an effort to reduce the delay in receiving the vehicles.
ACTION REQUESTED -
APPROVE THE PURCHASE OF FIVE NEW FORD EXPLORER PATROL VEHICLES, INCLUDING ALL NECESSARY EQUIPMENT; AND AUTHORIZE THE OROVILLE POLICE
DEPARTMENT COORDINATE WITH OROVILLE FORD AND BEGIN THE VEHICLE ORDERING PROCESS PRIOR TO JULY 1, WITH PAYMENT TO BE COMPLETED IN THE NEXT FISCAL YEAR.
7 April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 8 of 9
PUBLIC HEARINGS
The Public Hearing Procedure is as follows:
- Mayor or Chairperson opens the public hearing and staff will present the item and answer Council questions.
- The hearing is opened for public comment limited to three (3) minutes per speaker. In the event of more than ten (10) speakers, time will be limited to one and a half (1.5) minutes.
Under Government Code 54954.3, the time for each presentation may be limited. - Speakers are requested to provide a speaker card to the City Clerk - Public comment session is closed and then the Council will debate and take action - Those wishing to speak at the public hearings below, but unable to attend before 5pm, may request that the council consider holding the public hearing after 5pm by emailing [email protected] or calling 530-538-2535. Please submit request 24 hours before the meeting.
- Individuals may email comments for council consideration to [email protected]
18. 4:30PM - WAIVING OF FIRST READING AND INTRODUCE BY TITLE ONLY ORDINANCE NO. 1896 REGARDING GENERAL PLAN AMENDMENT GPA26-02 AND ZONING CHANGE ZC26-02 AT 2020 MONTGOMERY ST (APN 012-032-014) AND 1453 DOWNER ST (APN 012- 094-008)
The City Council shall conduct a public hearing and consider the Zoning Change recommendations to modify the zoning of two downtown properties, identified as Assessor’s Parcel Numbers 012-032-014 and 012-094-008. The proposed amendment would change the current Public or Quasi-Public (PQ) zoning to Downtown Mixed-Use (MXD) consistent with their surrounding neighbors.
ACTION(S) REQUESTED -
1. WAIVE THE FIRST READING OF ORDINANCE NO. 1896 AND INTRODUCE BY TITLE ONLY; AND
2. CONDUCT A PUBLIC HEARING ON THE PROPOSED GENERAL PLAN
AMMENDMENT AND ZONE CHANGE FOR BOTH PARCELS, AND
3. DIRECT STAFF TO BRING ORDINANCE NO. 1896 BACK FOR ADOPTION AT THE MAY 5, 2026 CITY COUNCIL MEETING.
PUBLIC COMMUNICATION – HEARING OF NON-AGENDA ITEMS
This is the time to address the Council about any item not listed on the agenda. If you wish to address the Council on an item listed on the agenda, please follow the directions listed above. 8 April 21, 2026~4:00 PM Oroville City Council Meeting Agenda Page 9 of 9
FUTURE AGENDA ITEMS / CORRESPONDENCE
1. Future Agenda Items
2. Correspondence
i. Fire Department Statistics Report for March 2026
ii. City Clerk Department Monthly Report March 2026
iii. Business Assistance and Housing Development Monthly Report March 2026 iv. PG&E Notice - Rate Increase Request to the CPUC
v. PG&E Rate Increase Request for Diablo Power Plant Cost Recovery
ADJOURN THE MEETING
The meeting will be adjourned. A special meeting of the Oroville City Council will be held on April 28, 2026 at 5:30 p.m.
Accommodating Those Individuals with Special Needs – In compliance with the Americans with Disabilities Act, the City of Oroville encourages those with disabilities to participate fully in the public meeting process. If you have a special need in order to allow you to attend or participate in our public meetings, please contact the City Clerk at (530) 538-2535, well in advance of the regular meeting you wish to attend, so that we may make every reasonable effort to accommodate you. Documents distributed for public session items, less than 72 hours prior to meeting, are available for public inspection at City Hall, 1735 Montgomery Street, Oroville, California.
Recordings - All meetings are recorded and broadcast live on cityoforoville.org and YouTube. 9
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: KAYLA REASTER, ASSISTANT CITY CLERK
RE: PRESENTATION FROM CINDY DANILUKE REGARDING THE ANY
GIVEN CHILD (AGC) PROGRAM
DATE: APRIL 21, 2026
SUMMARY
The City Council shall receive a presentation by Cindy Daniluke that provides an overview of the Any Given Child (AGC) program and highlights local efforts to expand arts education opportunities for Oroville-area students through collaborative partnerships.
DISCUSSION
In Spring 2020, the Butte County Office of Education applied for participation in the national AGC program, an initiative designed to expand equitable access to arts education for all students. The City of Oroville, along with other community partners, provided letters of support for this designation.
By Fall 2021, Butte County was accepted into the AGC National Network. Participating school districts include:
Thermalito Union Elementary School District
Oroville City Elementary School District
Palermo Union School District
Initial planning meetings focused on funding opportunities and building a coordinated arts education framework across the region.
Following the passage of Proposition 28 Arts, Music in Schools Funding Guarantee and Accountability Act in November 2022, which provides dedicated funding for arts and music education, the AGC program shifted its focus toward strengthening partnerships between schools, museums, and local organizations.
10 Item 1.
FISCAL IMPACT
None.
ACTION REQUESTED -
RECEIVE PRESENTATION AS INFORMATION.
ATTACHMENTS
PowerPoint Presentation
11 Item 1.
12 Item 1.
• Butte County Office of Education (BCOE) applied for Ensuring the Arts for Any Given Child (AGC) program in Spring 2020
• The City of Oroville and other organizations wrote letters of support for the designation
• Fall 2021 - Butte County joins the AGC National Network • Thermalito Elementary School District, Oroville City Elementary School District and Palermo Union School District are the supported districts
• Initial Community Arts planning meetings were held via Zoom during Covid and focused on funding opportunities
• November 2022 – Prop 28 Arts and Music in Schools Funding Guarantee and Accountability Act passed easing the need for AGC fundraising
• AGC focus turned to creating connections between schools, museums and local businesses to provide quality educational experiences 13
Item 1.
AGC KICK
-OFF
PRESS
CONFERENCE
Kathy Nolind, Superintendent PUESD
Mary Sakuma, Superintendent BCOE
Dr. Spencer Holtom, Superintendent
OCESD
Greg Blake, Superintendent TUESD
Chuck Reynolds, Mayor, City of Oroville
14 Item 1.
15 Item 1.
AGC creates partnerships to provide
a quality educational field trip
experience Chinese Temple Field Trip
• Educational Standards document available on STAGE website • BCOE contacts school administration, grade school teachers and art teachers to coordinate the field trip
• Art teachers create a lesson and art project for display • Local organizations donate funds for books, other in-class learning activities and transportation if needed
• AGC provides volunteers to act as docents for the field trip • Museum staff develops the stations, timing, flow and activities for the field trip • Museum staff creates training documents and a training day for volunteer docents
• Museum staff creates an in-school presentation prior to the field trip • Museum staff, AGC committee and community volunteers come together to serve 240 local students
16 Item 1.
Chinese Temple Field Trip – Third
Grade
Educational Standards
Criteria
Museum staff create field
trip plan and training
documents
17 Item 1.
Chinese Temple Field Trip – Third
Grade Friends of the Park docents donated
money to purchase books for each
school to learn about Lunar New Year
prior to field trip
Quinn Neves, Museum Assistant,
visited each school to present
information on the Chinese Temple and
to review museum etiquette with
students ahead of the field trip.
18 Item 1.
Chinese Temple Field Trip – Third
Grade
Hands on Shadow
Puppet activity
Student art displayed at
Chinese Temple
19 Item 1.
Chinese Temple Field Trip – Third Grade
Quote by 3rd grade Teacher, Helen Wilcox Elementary School, Christy Allsup
The field trip to the Chinese Temple was one of the most organized field trips we've attended. All 6 classes had nothing but great things to say about it--kids, teachers, and parent volunteers as well. It was the perfect mix of learning, combined with just enough hands-on activities. We appreciated the docent presentation beforehand, the books, and the amazing art Ms. Mikaela did with our students.
20 Item 1.
THANK YOU
The quality of these field trips would not be possible without strong partnerships. Museum staff have elevated the experience through their active participation. We hope to expand these opportunities to more students and grade levels, but doing so will require continued support from all of our community partners.
21 Item 1.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: RUTH DUNCAN, ASSISTANT CITY ADMINISTRATOR-ADMINISTRATIVE
SERVICES
RE: INVESTMENT UPDATE
DATE: APRIL 21, 2026
SUMMARY
The City Council shall receive an investment update from Ryan Midkiff of Building Bridges Financial Advisors, regarding our investment account with Ameriprise Financial.
DISCUSSION
The City invested 20 million in Certificates of Deposits and US Treasury Bonds. The current value of this investment fund is currently over 22 million and comprises approximately 56 individual investments in Cash, CD and US Treasury Bonds.
This investment fund was intended to diversify our overall investment portfolio.
Formerly our only investment was with Local Agency Investment Fund (LAIF) managed by the California State Treasurer.
FISCAL IMPACT
None
ACTION REQUESTED -
RECEIVE INVESTMENT INFORMATION.
ATTACHMENTS
None.
22 Item 2.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: KAYLA REASTER, ASSISTANT CITY CLERK
RE: RESOLUTION RECOGNIZING MAY 3–9, 2026, AS PUBLIC SERVICE
RECOGNITION WEEK
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider adopting Resolution No. 9450 recognizing May 3–9, 2026, as Public Service Recognition Week in the City of Oroville.
DISCUSSION
Public Service Recognition Week has been celebrated nationwide since 1985 to honor the contributions of public employees at all levels of government. These individuals provide essential services that support the health, safety, and quality of life of the community.
The City of Oroville employs a dedicated workforce that delivers a wide range of services, including public safety, infrastructure maintenance, utilities, parks and recreation, planning, and administrative support. Recognizing Public Service Recognition Week provides an opportunity to acknowledge the professionalism, integrity, and commitment of these employees.
Adopting the proposed Resolution allows the City Council to formally recognize the efforts and contributions of public employees who serve the Oroville community. This recognition aligns with national efforts to highlight the importance of public service and promotes community appreciation for the work performed by City staff.
The Resolution proclaims May 3–9, 2026, as Public Service Recognition Week and encourages residents to acknowledge and thank public employees for their service. 23 Item 1.
FISCAL IMPACT
None.
ACTION(S) REQUESTED -
ADOPT RESOLUTION NO. 9450; AND AUTHORIZE THE MAYOR TO SIGN.
ATTACHMENTS
1. Resolution No. 9450
24 Item 1.
City of Oroville
RESOLUTION NO. 9450
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OROVILLE RECOGNIZING MAY 3–9, 2026, AS PUBLIC SERVICE RECOGNITION WEEK
WHEREAS, public employees at the federal, state, and local levels provide essential services that support the health, safety, and quality of life of our community; and WHEREAS, Public Service Recognition Week has been celebrated nationwide since 1985 to honor the contributions of public servants and to recognize the vital role they play in effective governance; and
WHEREAS, the dedicated employees of the City of Oroville work tirelessly to deliver critical services including public safety, infrastructure maintenance, parks and recreation, utilities, planning, and administrative support; and
WHEREAS, public servants demonstrate professionalism, integrity, accountability, and a commitment to serving the residents of Oroville with excellence; and WHEREAS, the City Council wishes to acknowledge and express its sincere appreciation for the hard work, dedication, and achievements of all public employees who serve our community each day; and
WHEREAS, it is appropriate to set aside a week to recognize public employees and to thank them for their service and contributions to the City of Oroville and the public at large.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Oroville as follows:
1. The City Council hereby proclaims May 3–9, 2026, as Public Service Recognition Week in the City of Oroville.
2. The City Council encourages all residents to recognize the accomplishments and contributions of public employees and to express their gratitude for the services they provide.
3. The City Council extends its appreciation to all public servants for their continued dedication to serving the community with professionalism and pride.
PASSED AND ADOPTED by the City Council of the City of Oroville at a regular meeting held on the 21st day of April, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
25 Item 1.
City of Oroville
APPROVED AS TO FORM:
_________________________________ ________________________________ David Ritchie, Assistant City Attorney David Pittman, Mayor ATTEST:
_________________________________
Kayla Reaster, Assistant City Clerk
26 Item 1.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: CHRIS TENNS, FIRE CHIEF
RE: AUTHORIZATION TO REPAIR FIRE ENGINE 91
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider authorizing expenditures to repair Fire Engine 91 following damage sustained while responding to a structure fire in early March.
DISCUSSION
In early March, Fire Engine 91 was damaged while responding to a structure fire. The incident resulted in damage to two compartment doors, along with paint and body damage along the side of the apparatus. The affected areas include the drip rail and side panels, which will require bodywork and repainting to restore the engine to proper condition.
The initial repair estimate is $22,812.36. Staff is requesting a not-to-exceed amount of $32,812.36 to account for the possibility that the compartment doors cannot be repaired. If repairs are not feasible, the doors will need to be rebuilt by Smeal, which would increase the overall cost. Staff will make every effort to complete the work within the original estimate and only utilize the additional funds if necessary.
FISCAL IMPACT
Repair is estimated at $22,812.36, with a not-to-exceed amount of $32,812.36. Funds for this repair will be drawn from the Capital Asset Fund - Outside Services.
ACTION REQUESTED -
AUTHORIZE FIRE ENGINE 91 REPAIRS, APPROVING A NOT-TO-EXCEED AMOUNT OF $32,812.36, TO BE FUNDED FROM CAPITAL ASSET - OUTSIDE SERVICES.
ATTACHMENTS
1. Quote
27 Item 2.
*** Customer Review ***
Date / Time:
Repair Order:
Customer:
Branch:
Invoice Total:
***Charge***
108
4/1/2026 12:42:31PM
Fairfield
1601
$22,812.36
Bill To: Oroville Fire Department Ship To: Oroville Fire Department 2055 Lincoln St 2055 Lincoln St
Oroville, CA 95966 Oroville, CA 95966
Customer P/O Completion Date
91 TristenFASfire
Created By
QUOTE
Unit Number: 91 Model Year: 2008 Make/Model: SPARTAN TYPE 1 Type: Equipment VIN: 4S7CT2D918C070432
Task: 1 02-000000 perform body work Department: Service Complaint: Drivers comparment door ripped off Rig
Cause: Drivers comparment door ripped off Rig
Correction: Repair 2 side compartment doors, Repair drip bar all the way down the side of body of rig, Bondo and paint whole side of body.
Supp. Part Description / Ref Number U/M Quantity Price Ext Price BH-10001 Hinge 304 2b 1x2-1/2L Part 28.00 35.62 997.36
ShopS-M Shop Supplies Misc 1.00 192.00 192.00
$1,280.00
$0.00
$0.00
$0.00
$997.36
Total Labor:
Total EHC:
Total Core Ret:
Total Core Chg:
Total Parts:
Totals
8.00 Total Miscellaneous: $192.00
Total Fab work: $8,340.00
Total paint and body: $11,904.88
Charge $98.12
Invoiced Total:
Total Tax:
Invoice Subtotal: Payment Method $22,714.24
$22,812.36
28 Item 2.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: AMY BERGSTRAND, DIRECTOR
BUSINESS ASSISTANCE AND HOUSING DEVELOPMENT
RE: MODIFICATIONS TO THE CAL HOME OWNER-OCCUPIED
REHABILITATION LOAN PROGRAM GUIDELINES
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider accepting changes made to the Cal Home OwnerOccupied Rehabilitation Loan Program Guidelines.
DISCUSSION
Staff is seeking City Council approval regarding modifications to the Cal Home Owneroccupied Rehabilitation Loan Program Guidelines. The guidelines were presented and approved by the Housing Loan Advisory Committee at the April 9, 2026th meeting. The major changes include removing interest, increasing the maximum loan amount from $75,000 to $100,000, and increasing the maximum income limits to 120% of the area median income, as set by the State Department of Housing and Community Development.
The Owner-occupied Rehabilitation Loan Program has not used the Cal Home Program Income Funds nor updated the program guidelines in several years. Additional modifications are minor in nature and have been made to bring the guidelines up to the current program standards and processes.
ACTION REQUESTED -
ADOPT RESOLUTION NO. 9451 - A RESOLUTION OF THE OROVILLE CITY COUNCIL AUTHORIZING MODIFICATIONS TO THE CAL HOME OWNEROCCUPIED REHABILITATION LOAN PROGRAM GUIDELINES. 29 Item 3.
ATTACHMENTS
1. Resolution No. 9451; and
2. Cal Home Owner-occupied Rehabilitation Loan Program Guidelines. 30 Item 3.
CITY OF OROVILLE
RESOLUTION NO. 9451
A RESOLUTION OF THE OROVILLE CITY COUNCIL AUTHORIZING MODIFICATIONS
TO THE CAL HOME OWNER-OCCUPIED REHABILITATION LOAN PROGRAM GUIDELINES.
BE IT HEREBY RESOLVED by the Oroville City Council as follows:
1. The Oroville City Council hereby authorizes the modification to the Cal Home Owner-occupied Rehabilitation Loan Program Guidelines. A copy of the changes to the Cal Home Owner-occupied Rehabilitation Loan Program Guidelines are attached hereto as Exhibit "A".
2. The City Clerk shall attest to the adoption of this Resolution.
PASSED AND ADOPTED by the Oroville City Council at a regular meeting on April 21, 2026, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
______________________________
David Pittman, Mayor
APPROVED AS TO FORM: ATTEST:
__________________________ ______________________________ David Ritchie, Assistant City Attorney Kayla Reaster, Assistant City Clerk 31 Item 3.
CalHome Housing Rehabilitation 1
CALHOME
HOUSING REHABILITATION
PROGRAM GUIDELINES est. 9/5/06, updated 7/7/2004/21/2026
PROGRAM PURPOSE
1.01 INTRODUCTION
The City of Oroville CalHome Housing Rehabilitation Loan Program has been established in order to conserve the older and basically sound residential neighborhoods.
1.02 PROGRAM OBJECTIVES
The City of Oroville’s CalHome Housing Rehabilitation Loan Program is designed to:
A. Improve neighborhoods and expand the supply of decent, safe, and sanitary housing.
B. Expand employment opportunities for jobless and underemployed lowincome persons.
C. Provide an environment for the social and economic growth and wellbeing of all inhabitants and property owners in the City of Oroville.
1.03 ADMINISTRATIVE OBJECTIVE
The City of Oroville’s CalHome Housing Rehabilitation Loan Program will be administered by the Business Assistance and Housing Development Department and will:
A. Support the program objective of improving neighborhoods through a housing rehabilitation loan program.
B. Offer options to homeowners for improving their property, doing it within their means, thus, indirectly affecting overall improvements that stimulate conventional private sector financial participation in the area.
C. Produce a revolving loan fund as an economically sound and costeffective rehabilitation strategy. Utilize the existing fiduciary and sociotechnical capacity of the City and offer the lowest costs to the participating public.
32 Item 3.
CalHome Housing Rehabilitation 2
1.04 LEGAL AUTHORITY
The City of Oroville’s CalHome Housing Rehabilitation Loan Program Guidelines are consistent with requirements of the California Health and Safety Code, commencing with Section 50650; the California Code of Regulations, Title 25, commencing with Section 7715; and the CalHome Program Guidelines.
1.05 PROGRAM AUTHORIZATION
The City Administrator is authorized to execute loan documents and agreements on behalf of the City of Oroville pertaining to the operation of the City’s CalHome Housing Rehabilitation Program operation.
1.06 GUIDELINE DEVIATIONS
Deviations from these Program Guidelines can only be made with approval of the Loan Advisory Committee.
ELIGIBILITY REQUIREMENTS
2.01 GENERAL CONFLICT OF INTEREST:
No member of the City Council or other official, employee or agent of the City Government who exercises policy, decision-making functions, or responsibilities in connection with the planning and implementation of the City of Oroville’s CalHome Housing Rehabilitation Program will directly or indirectly be eligible for financial assistance under this program. This prohibition will continue for one (1) year following the termination of the individual’s relationship with the City.
2.02 APPLICANT ELIGIBILITY CRITERIA:
A. An owner may be eligible to participate in the program, upon producing evidence of fee simple or equitable title to the property under consideration.
B. Owner must have owned and resided on the property for six months prior to applying for a loan. However, the six months prior ownership and occupancy requirements are waived if the property has been deemed as Substandard and Unsafe by the City Building Department; however, in either case, the applicant must demonstrate that he/she presently own property that he/she is currently residing in, and that he/she intends to occupy the rehabilitated property.
33 Item 3.
CalHome Housing Rehabilitation 3
C. Gross family income will include the incomes of all permanent adult members of the household who can reasonably be expected to continue as members of the household for a substantial portion of the term of the loan and whose income is contributed in substantial part toward maintenance of the household, from all sources including, but not limited to the following:
1. Wages, salaries, tips, payments for disability, AFDC, SSI, Social Security, retirement pensions, unemployment benefits, child support, alimony, net income from rental properties owned, interest, dividends, etc. For self-employed persons, income will be determined by the average gross income minus business expenses for the last three years. (Depreciation is not an allowable expense.)
2. If title to the property is held by others than the occupants of the dwelling the income of the occupants will only be used to determine the eligibility for all loans.
3. Income will also include the value of the family’s assets. For this purpose, the amount used is either the actual amount of income derived from all net household assets or 2.52% of the value of all such assets. Assets shall include: the value of equity in real property (other than the primary residence), savings accounts, stocks, bonds and other forms of capital investments.
4. Participating households will be restricted to household incomes not to exceed 80 120 percent (80120%) of the area median income for Butte County.
5. Annual monitoring of borrowers shall be done in the form an Annual Property Certification form filled out by the property owner. Further, the property owner will be required to provide evidence supporting that they reside at the property as their principal residence. Suitable evidence would be a copy of the property owner’s federal taxes, or a copy of a PG& E bill as well as or another utility bill that would prove residency.
D. A list identifying all dependents will be required for submission with a loan or grant application.
2.03 PROPERTY ELIGIBILITY CRITERIA:
A. The property must be within the City limits of Oroville. The rehabilitation program guidelines are restricted to single-family, owner-occupied units, 34 Item 3.
CalHome Housing Rehabilitation 4
duplex units where the owner resides in one of the units, and manufactured homes on a permanent foundation. or a manufactured
2.04 ELIGIBLE PROPERTY IMPROVEMENTS
A. The following code-related repairs and improvements are required:
1. Repairs and/or improvements needed in order to bring a property into reasonable compliance with the local housing code and CA Building code standards.
2. Repairs or improvements needed to correct incipient code violations. An incipient code violation is defined as a housing condition that is not yet in violation of the code but is likely to deteriorate in the immediate future to the point of violation.
3. Removal of all trash, junk, and debris from yard in order to eliminate safety hazards and maximize the visual benefits of rehabilitation.
4. Installation and/or replacement of basic weatherization and energy conservation measures, i.e., caulking, weather-stripping, insulation, and dual pane windows.
5. Any repairs necessary to meet the City’s Property Rehabilitation Standards.
6. Addition of bedrooms to eliminate overcrowding as defined in Section 501 - 503 of the 1994 Uniform Housing Code.by the State Department of Housing and Community Development.
7. Provision of modest cooling systems, i.e., permanently affixed evaporative coolers or central air conditioners.
8. Repairs, replacements, and/or improvements required on residential structures built before 1978 that are subject to LeadBased Paint Regulations 24 CFR Part 35.
FINANCING PROGRAMS
3.01 All Financing Options:
A. Purpose of Loan - The borrower agrees to use the loan proceeds to accomplish the rehabilitation of his/her property to the extent determined by the owner and Housing and Building Department staff. 35 Item 3.
CalHome Housing Rehabilitation 5
B. Maximum Loan Amount – A maximum loan amount not to exceed a $75,000$100,000 loan amount that includes contingency, loan fees and activity delivery costs, and that when added to the outstanding indebtedness relating to the property, creates a total indebtedness that does not exceed 105% of the after-rehabilitation market value estimate. However, the maximum loan amount may be waived by the Loan Advisory Committee based on applicant need, housing deficiencies, and loans and/or liens subordinate to housing rehabilitation loans made by the City.
C. Maximum Loan Term - The maximum loan term will not exceed thirty years for deferred loans. Any extensions of the loan term will be reviewed on an individual basis and approved by the Loan Advisory Committee in accordance with CalHome Program Guidelines and Regulations.
D. Interest Rate - The interest rate will be 30%.
E. Maximum Debt Ratio-The maximum debt to income ratio will be 4244%.
F. Housing Expense Ratio-The housing expense ratio will be at least 28% E. Loan Assignment - All loans shall become due and payable upon the transfer or sale of the borrower’s interest in the property, change of use from residential to commercial, a noncompliance with the rehabilitation plan, if the property is no longer occupied by the borrower and/or is being rented and at maturity of the loan.
F. Loan Security - The loan will be evidenced by a Promissory Note executed by the borrower and will be secured by a Deed of Trust, with assignment of rents and a rehabilitation Lloan repayment Repayment agreementAgreement, both of which shall be recorded against the property. A manufactured home in a mobile home park or on leased land that is not on a permanent foundation will be secured by an HCD 480.7 or HCD 484 Statement of Lien.
G. Includable Loan Costs - Costs eligible for inclusion in the rehabilitation loan include those cost attributable to the rehabilitation of the subject property as follows:
1. Credit report.
2. Policy of title insurance and recording fees.
3. Structural pest control report.
36 Item 3.
CalHome Housing Rehabilitation 6
4. Inspection fees: appraisal, market value estimatelead-based paint assessment and testing, property inspection reports and all building permit fees.
5. Architectural and/or engineering services up to a maximum of 6% of the total construction cost.
6. Activity delivery fee (one-time charge) includes expenses incurred and to be incurred by Housing Rehabilitation Program staff administering the loan.
7. Eligible rehabilitation construction costs.
8. Loan contingencies: An amount not less than 3% or more than 10% of the budgeted cost of all improvements is to be included in the rehabilitation budget, to cover cost overruns and required construction changes during the construction period. The borrower must authorize the use of this contingency by change order and the Housing Rehabilitation Program staff must approve the
disbursement. Should funds remain in the contingency account after project completion; this excess amount will be credited against the loan principal balance.
H; Project Related Soft Costs (not included in the loan but charged to grant)
1. Activity delivery fee (one-time charge) includes expenses incurred and to be incurred by Housing Rehabilitation Program staff administering the loan.
APPLICATION PROCESS
4.01 PRE-APPLICATION PROCESS:
A. Property owner will contact the Housing Rehabilitation Office for information regarding the housing rehabilitation loan program.
B. The Housing Rehabilitation Program Staff will explain the eligibility criteria and, if it appears the applicant will qualify for financial assistance, will set up an application appointment with a loan specialist.
4.02 APPLICATION PERIOD, RATING, AND SELECTION
Applications will be accepted year-round on a first-come first-served basis.
4.03 LOAN PROCESSING
1. At the time of the appointment for application intake, owner prepares and submits a financial package to Housing Rehabilitation Program staff. The financial package will include:
Formatted: Indent: Left: 1", Hanging: 0.5", Numbered
+ Level: 1 + Numbering Style: 1, 2, 3, … + Start at: 1 + Alignment: Left + Aligned at: 1.5" + Indent at: 1.75"
37 Item 3.
CalHome Housing Rehabilitation 7
a. application for financial assistance with all authorization forms signed and dated;
b. authorization forms, signed and dated; proof of current homeowner’s insurance policy;
c. proof of ownership of property, i.e., copy of Grant Deed, title policy, etc.; proof that property taxes are paid current;
d. income verification, i.e., 3 months of employment pay stubs, award letter for Social Security or retirement benefits, verification of AFDC or SSI benefits, income tax returns, financial statements, etc.; e. Most current two years of tax return statements, signed and dated and most current two years of W2 documents, or signed affidavit of non-filing status;
f.e. verification of mortgage statusmost recent mortgage statement;statement.
g.f. verification of bank accounts.six months of checking account statements (only one month most recent for savings accounts) for all open accounts.
2. Housing Rehabilitation Program staff will review application and, from the information submitted, determine whether homeowner meets eligibility requirements.
3. Income Qualifying shall be determined as follows:
a. A current “snapshot” of gross income (pay stubs or social security income statement, a pension statement, etc.) shall be used and then projected out for a 12-month period to determine gross annual income.
b. Written third party verification shall be obtained for income verification and/or suitable documents provided by the applicant. c. A thorough assessment of information obtained shall be done. The recipient shall take into account number of pay periods, frequency of certain types of pay, what constitutes an annual salary regardless of the number of months worked in a year, etc. d. A comparison of Gross Income to the HCD income limit chart shall be done.
e. Gross Income shall mean the amount earned before any deductions have been taken and shall use the projected earnings rather than past earnings. All income from household members that are 18 years of age or older shall be included.
f. The actual amount of income of assets in excess of $5,000 or a 22.5% passbook rate of the value of all such assets in excess of $5,000 shall be included in the determination of gross income. 38 Item 3.
CalHome Housing Rehabilitation 8
g. The values of net household assets shall be used in the determination of gross income such as savings accounts, stocks, bonds, investments, etc.
h. Income Inclusions and Exclusions shall also be used in income determinations. Please see appendixes A and B to the CalHome Program Guidelines.
4. Housing Rehabilitation Program staff will secure credit report, to see if any problems exist which will prevent providing financial assistance to property owners.
5. Housing Rehabilitation Program staff will request a property inspection from the Property Rehabilitation Construction Supervisor.
6. Housing Rehabilitation Program staff will request preliminary title report, an appraisal or market value estimate, lead-based paint risk assessment and inspection/testing for asbestos containing material, and a termite inspection report.
7. Property Rehabilitation Construction Supervisor will perform and initial property inspection. and owner will inspect the property. If it appears that the project is feasible, and owner wishes to continue with the rehabilitation of his/her home, Property Rehabilitation Construction Supervisor will submit an initial scope of work and estimate to the City, followed by a project work write up. a property work write-up and bidding instructions listing the requirements of the City to the owner. Owner and City will review and approve property work write-up and bidding instructions listing the requirements. Owner will authorize City staff to mail invitations for sealed bids to eligible and interested contractorspost notice of the bid publicly and invite contractors to attend the mandatory job walk.
8. Housing Rehabilitation Program staff will mail invitations for sealed bids to eligible and interested contractors.
9. Property owner will be responsible for checking references and selecting the lowest, most qualified bidder. Property owner must have justification for selecting a contractor whose bid is not within a 10% range of the Property Rehabilitation Construction Supervisor estimate of construction costs. Under special circumstances approved by the Housing ManagerDirector/City Administrator, the property owner may choose a contractor that is outside of the 10% range of the Property Rehabilitation Construction Supervisor estimate of construction costs. 39 Item 3.
CalHome Housing Rehabilitation 9
10. Housing Rehabilitation Program staff and owner will review the work writeup and bid form and if it meets the program criteria, will prepare construction agreements.
11. Program staff will compare construction cost with market value estimate or appraisal to determine if there is sufficient equity in the property.
12. Program staff will review application to determine funding source for project.
13. Program staff will prepare the loan package for submission to the City Loan Advisory Committee for approval.
14. Program staff presents the package to the Loan Advisory Committee.
15. Approval or denial of the loan by the Loan Advisory Committee.
16. Loan documents executed by property owners.
17. Deed of Trust and Rehabilitation Loan Repayment Agreement are sent to Title Company for recording and issuance of ALTA. Policy.
18. Construction contracts are executed by property owner and contractor.
19. Program staff sets up the loan dispersal in Grants Management Accounting Sysytem. provides Finance Department with copy of Note and Truth in Lending.
20. Property ownerProgram staff issues Notice to proceed to the contractor.
21. Property owner/cContractor obtains the necessary permits.
22. Property owner is responsible for contractor performance (not the City).
Property Owner and Rehabilitation Construction Supervisor will inspect rehabilitation work and authorize City to issue progress payments as provided in construction contracts. Rehabilitation Construction Supervisor will inspect rehabilitation as a lender, to assure compliance with the construction contract and program requirements. No payment is to be issued without necessary permitsRehabilitation Construction Supervisor’s confirmation that all work related to payment request has been completed. .
23. Property owner and Rehabilitation Construction Supervisor make final inspection of completed rehabilitation work and authorize final payment to the contractor.
40 Item 3.
CalHome Housing Rehabilitation 10
24. Property owner/contractorProgram staff files records Notice of Completion.
25. City issues final payment to the contractor for completed rehabilitation work and contractor fills out a lien waiver and release affidavit.
26. Disposition of Fund Statement signed by property ownerLoan is reconciled and any remaining unused funds are credited to the note and a letter is sent to the homeowner notifying them of the new loan balance.
27. File closed.
4.04 LOAN SETTLEMENT
This section sets forth procedures for preparing the loan settlement documents, completing loan settlement and carry out post-loan settlement.
A. Preparing Loan Settlement Documentation - The City or its authorized representative will prepare for loan settlement as follows:
1. Prepare a Promissory Note, Deed of Trust, Loan Repayment Agreement, Request for Notice of Default, Truth-in-Lending Disclosure Statement and recession notice as applicable.
2. Contact borrower to set up a time for loan settlement.
3. Request borrower to bring with him/her the original and memorandum copy of an add the City as a mortgagee/loss payee on an insurance policy for fire and extended liability coverage, in accordance with the value of the property and indebtedness on the property after rehabilitation. The policy must include an endorsement showing City/Authority as the loss payee.A copy must be received by program staff before work can commence on the project.
4. Request borrower to bring the original or a certified copy of the receipt for payment of the current insurance premium, plus his/her most recent property tax and/or special assessment payment receipts.
5. If the first Deed of Trust holder is holding an impound account, borrower must bring verification showing what has been impounded (taxes or insurance or both), amount of impound being collected each month and current status of the account.
41 Item 3.
CalHome Housing Rehabilitation 11
B. Completing the Loan Settlement - Review the terms and conditions of the loan with the borrower, to ensure that he/she understands what is expected of him/her. Obtain signatures and acknowledgment if applicable. Obtain required insurance documents and tax receipts.
C. Disbursements/Account Management - Disbursements from the rehabilitation account will be made only for the following purposes, as appropriate for each applicant:
1. To make progress and final payment for rehabilitation work to the contractor., owner, subcontractor and supplier.
2. To make payment for eligible incidental costs.
3. To close out the rehabilitation account, appropriately disbursing any unutilized funds remaining in the rehabilitation account to the rehabilitation loan balance of borrower.
D. Progress, Final Payment, and Retention Payment to Contractor - Upon receipt of a request for progress payment, approved by the homeowner, from the contractor, and following the City’s inspections and approval of the work, City will authorize payment due to the contractor for the work satisfactorily completed. Payments will at no time exceed 90% of the total construction costs. The remainder due contractor will be withheld pending satisfactory completion of all the work as set forth in the contract. When all the work is found to be satisfactorily completed in accordance with contracts, City will obtain from the contractor a Release of Liens; the City will authorize final payment to the contractor no sooner than thirty-five (35) days following the recording of the Notice of Completion. The amount of the final payment check will include, if applicable, any progress payments sums previously withheld, but due the payee.
E. Adjustment and Close out of the Rehabilitation Account - Disbursements will close-out the rehabilitation account. However, if unutilized funds remain in the rehabilitation account because the actual rehabilitation costs were less than anticipated or for other reason, the unutilized funds will be applied to the principal loan balance of borrower.
F. Disposition of Funds Statement - After all funds have been disbursed from rehabilitation account and the account has been closed, the City will prepare a Disposition of Funds Statement in which the City will account for the disposition of the full rehabilitation loan amount and any other funds in the rehabilitation account for applicant.
4.05 LOAN SERVICING
42 Item 3.
CalHome Housing Rehabilitation 12
This section sets forth procedures for the handling of loan payments and payoffs and loan monitoring. City will record all recordable instruments and obtain evidence of recordation.
A. Monitoring the Rehabilitation Loan – the City of Oroville shall monitor compliance with loan requirements as follows:
1. An “Owner Occupancy Declaration” shall be sent out once per year to ensure continued owner occupancy.
2. If the City of Oroville is not in receipt of revised evidence of insurance at the annual renewal, the City may, at its option, purchase force placed insurance on the property and/or call the loan immediately due and payable.
3. Upon receipt of notice of non-payment of taxes from the Butte County Tax Collector’s office, the Housing Department shall send, via certified mail, notice to the borrower that if taxes are not paid the City of Oroville may, at its option, pay taxes due and/or call the loan immediately due and payable.
B. Payments – the City of Oroville Finance and Housing Departments shall process payments and late notices in the following manner:
1. All payments shall be posted on the date received to the Grant Management Accounting System.
2. A copy of all payment receipts shall be given to the Housing Development Department each month for their loan file.
3.2. The Finance Department shall deliver to the Housing Department Program staff will prepare an “aging” report each month showing the number of days late each loan payment is.
4.3. Housing Department shall send out late payment notices per the aging report each month.
C. Payoffs – the City of Oroville Finance and Housing Departments shall handle requests for payoff and payoff checks as follows:
a. Upon receipt by the Housing Department of a request for payoff statement, Housing shall send to Finance a request for prepare payoff figures containing all loan information. Housing is responsible for verifying all information provided by Finance with information contained in the loan file. b. Upon receipt of payoff checks by the Housing Department, Housing shall complete payoff instructions to Finance, copy check and payoff instructions for loan file, and upon approval from designated Housing Staff, deliver original check and instruction to Finance for processing. 43 Item 3.
CalHome Housing Rehabilitation 13
c. Housing Department staff shall, upon receipt of payoff, prepare a Substitution of Trustee and Deed of Full Reconveyance to be signed by the City Administrator and delivered to the appropriate title company for recordingthe Butte County Recorder’s Office to record.
D. Default and Foreclosure – City is authorized to declare, at its option, all or any part of such indebtedness immediately due and payable should any of the following events occur:
1. Failure to pay the amount of any installment of principal and interest, or any other charge payable on the note, which will have become due, prior to the due date of the next installment.
2. Nonperformance by the Trustor of any of the terms and conditions of the Deed of Trust, Promissory Note, and/or Loan Repayment Agreement, or of any other agreement heretofore, herewith or hereafter made by the Trustor with the beneficiary, in connection with such indebtedness, after Trustor has been given notice by the beneficiary of such nonperformance.
3. Failure of Trustor to perform any covenant, agreement, term or condition in any instrument creating a lien upon the conveyed property, or any part thereof, which will have priority over the lien of the Rehabilitation Loan Deed of Trust. A Request for Notice of Default will be recorded against property.
4. Beneficiary’s discovery of Trustor’s failure in any application of Trustor to beneficiary’s, to disclose any fact deemed by beneficiary to be material, or in the making therein that would have prevented the Trustor from being eligible for the rehabilitation loan program, or in any of the agreements entered into by Trustor with the beneficiary (including, but not limited to, the Note, this Deed of Trust, and Loan Repayment Agreement) of any misrepresentation by, on behalf of, or for the benefit of the Trustor.
5. Upon default by Trustor in payment of any indebtedness secured hereby, or in performance of any agreement hereunder, beneficiary may declare all sums secured hereby immediately due and payable, by delivery to Trustor of written declaration of default and demand for sale, and of written notice of default and of election to cause the property to be sold, which notice Trustee will cause to be duly-filed for the record. Beneficiary will also deposit with Trustee, this Deed, the Note, and all documents evidencing expenditures secured hereby.
44 Item 3.
CalHome Housing Rehabilitation 14
After the lapse of such time as may then be required by law and following the recordation of said Notice of Default and Notice of Sale, Trustor will sell said property at the time and place filed by it in said Notice of Sale, at public auction to the highest bidder, for cash in lawful money of the United States, payable at time of sale. Any person, including Trustor, Trustee or beneficiary, may purchase at the sale. Trustee will apply for the proceeds of sale to the payment of:
a. The expenses of such sale, together with the reasonable expenses of this Trust, which will include legal fees if any are incurred; b. Cost of any evidence of title procured in connection with such sale, and revenue stamps on Trustee’s Deed;
c. All sums expended under the terms hereof, not then repaid, with accrued interest at the rate provided on the principal debt; d. All other sums then secured hereby; and
e. The remainder, if any, to the person or persons legally entitled thereto.
CONSTRUCTION
5.01 DETERMINATION OF WORK TO BE DONE
The Rehabilitation Construction Supervisor and the owner will inspect the property, and will identify deficiencies, per the City Code that are required to be completed with the rehabilitation loan. Other work may be identified that the Rehabilitation Construction Supervisor suggests should be done but are not specific City requirements. The Rehabilitation Construction Supervisor will consult and advise the owner of the work to be done. The Rehabilitation Construction Supervisor will prepare a work write-up and cost estimate. The Owner will review and approve the work write-up and cost estimate.
5.02 CONTRACTOR SELECTION AND BIDDING
Contracting for rehabilitation work will be done on a competitive basis for all contracts involving more than $2,000.00 in accordance with City Code Requirements. The Housing Department will maintain a list of all interested contractors who will be kept informed of upcoming bid proposals. All interested contractors and subcontractors must have a California Contractor’s License and maintain Worker’s Compensation and Employer Liability Insurance, as required.
Additionally, Contractor’s doing business in Oroville must obtain a Business License.
The Owner will authorize the City to invite qualified licensed contractors to bid for the rehabilitation work identified in the work write-up and plans, if any. The successful bidder will generally be the low bidder. The owner will be responsible 45 Item 3.
CalHome Housing Rehabilitation 15
for contractor selection based upon the bid amount and the contractor’s reputation. The owner will be responsible for checking contractors’ references. If the borrower elects to choose other than the low bidder then the borrower must submit, in writing, such reason for not selecting the low bidder. A selected contractor will be licensed, of good reputation, financially sound, and capable of obtaining adequate labor, and have adequate financial resources to carry out his/her bid and proposal to do the necessary work within the time specified in the contract. Potential contractors must apply to the City and obtain approval prior to being added to the Contractor’s Bid List.
5.03 CONTRACTING FOR REHABILITATION WORK
A. The contract for rehabilitation will be between the property owner and the contractor. The owner is responsible for contractor performance. The City and Owner will at all times have access to the work during its progress and will be furnished with every reasonable facility for inspection for ascertaining that the materials, work and work performance, and equipment are in accordance with the requirements and intentions of the contract.
If such work is not satisfactory to the City, City may stop work on the repairs and improvement and order the replacement or correction thereof or additions thereto and withhold all disbursements hereunder until such work on the repairs and improvements are deemed to be satisfactory.
City, however, is under no obligation to make or supervise the repairs and improvements. Inspection by City is for the sole purpose of protecting City’s security and is not to be construed as a representation that the repairs and improvements will be free from faulty material or work.
The owner has the right to and may make or cause to be made other independent inspections as desired for their own protection.
B. Inspection/Payments - Following the owner’s approval of contractor payment request, the City Rehabilitation Construction Supervisor will inspect the job and determine if the repair work is satisfactory. If the City determines that the work completed is satisfactory, the City will approve the payment request and route that request to the City Finance Department for payment.
C. Change Orders - The owner, without invalidating the contract may order changes in the work within the general scope of the contract consisting of additions, deletions, or other revisions, the contract sum and the contract time being adjusted accordingly. All such change in the work will be authorized by change order and will be executed under the applicable conditions of the contract documents. If the contractor performs any extra 46 Item 3.
CalHome Housing Rehabilitation 16
work prior to receipt of an approved change order, he/she forfeits all right to extra payment for such work.
D. Completion of Work/Final Payment - Upon request for completion inspection by the contractor, City staff/Owner will inspect the property for compliance to the construction contract. If there are items yet to be completed or need to be redone, Owner/City staff will provide contractor with a “punch list” identifying what remaining work items require correction. Once all work is satisfactorily completed, the City/Owner will:
1. Approve all Contract work;
2. Obtain signed-off copies of all building permits;
3. Obtain lien releases from the contractor and subcontractors and suppliers; and
4. Obtain all warrantee and guarantees for the owner.
E. DEFAULT ON WORK REQUIREMENTS
Each of the following events will constitute events of default:
1. Substantial deviations from the repairs and improvements without prior approval of City or the appearance of defective work or materials which is not corrected within thirty (30) days after written notice thereof.
2. Cessation of work on the repairs and improvements prior to completion for a continuous period of thirty (30) days or more.
3. The filing of any claim of lien against the property and the continued maintenance of said claim for a period of five (5) days without discharge or satisfaction thereof.
4. Owner/Contractor’s filing of a petition in bankruptcy, or for debtor’s extension of time, or any other relief under the Bankruptcy Act, or any other state or federal insolvency law, as not existing or as hereafter amended; or if owner/contractor is adjudicated bankrupt; or if any petition filed against owner/contractor under the provisions of the Bankruptcy Act is approved; or if a general assignment for benefits of creditors is made.
5. Sale of property prior to completion of repairs and improvements.
6. The breach of any covenant, warranty, promise, or representation under any applicable agreement.
Formatted: Indent: Left: 1", Hanging: 0.5"
47 Item 3.
CalHome Housing Rehabilitation 17
GENERAL REQUIREMENTS
6.01 TRUTH-IN-LENDING REQUIREMENT
A. Truth-in-Lending Disclosure Statement - An approved Truth-in-Lending Disclosure Statement is to be used at a loan settlement in meeting the requirement of the Truth-In-Lending Act.
1. A completed Disclosure Statement will be given to all borrowers of loans on residential property.
2. The Disclosure Statement will be given to borrower at loan settlement, but prior to the time he/she executes the Deed of Trust and Promissory Note obligating his or her repayment or the loan.
3. When the Disclosure Statement is given to borrower, he/she will be requested to sign and date the Statement. A signed copy of the Disclosure Statement will be retained by City in the loan document file.
6.02 ADDITIONAL TERMS, CONDITIONS AND ASSURANCES
Specific legal provision and conditions for a rehabilitation loan are set forth in the Deed of Trust, Loan Repayment Agreement, other security instruments, and the Promissory Note. In addition, an applicant must agree to the following “terms and conditions”:
A. Borrower will not discriminate upon the basis of race, color, sex, marital status, disability, religion, or national origin in the sale, lease, rental, use or occupancy of the property to be rehabilitated under this program.
B. As required, borrower will comply with all applicable provisions of Federal statutes and regulations and City or County ordinances concerning equal employment opportunities for persons engaged in rehabilitation work undertaken in connection with the City of Oroville’s CalHome Housing Rehabilitation Program.
C. Borrower will agree to use loan proceeds only to pay for costs of services and materials necessary to carry out the rehabilitation work identified in the project work plan. Proceeds will not be used to pay expenses for work completed prior to loan approval or authorization to proceed.
D. Loans subordinated to the CalHome loan must not have a balloon payment due prior to the maturity date of the CalHome loan. 48 Item 3.
CalHome Housing Rehabilitation 18
E. Insurance - There will be a policy of title insurance on all secured loans in the amount of the rehabilitation loan. As well a Fire and extended coverage insurance will be required on the property, naming the City as first loss payable or second loss payable per loan position.
F. Protect the Public Interest - Borrower will allow no employee or official of the City of Oroville to have any interest, direct or indirect, in the proceeds of a loan.
G. Fees, Commissions, or Gifts - Borrower will pay no fees commissions and make no gifts to any person exercising any function or responsibility, direct or indirect, in connection with administration of the loan.
H. Minority Contractor Participation - Borrower will agree to provide opportunities for participation in rehabilitation by minority and female business enterprises.
I. Loan Security Requirements - Borrower will provide security for the loan in the form of a Promissory Note secured by a Deed of Trust with Assignment of Rents.
J. Rehabilitation Loan Funds - Borrower will authorize the City of Oroville, or its designee, to establish a rehabilitation account and to act as agent of the rehabilitation loan and to authorize disbursement of such funds to borrower and contractor as set forth in the contract between them. In the case of multiple ownership, where borrowers hold title, the signature of every titleholder will be required on all documents where signature of the borrower is required, unless a properly executed power of attorney is filed with the City.
K. Records - Borrower will keep such records as may be required by the City, or its agent, in connection with the rehabilitation work.
L. Inspections - Borrower will be responsible for compliance with the contract documents. Borrower will permit inspection of the property by Housing Rehabilitation and City Building Department staff to further inspect the job with regard to the property, the rehabilitation work, and all contracts, equipment, materials, payrolls, and conditions of employment pertaining to the work.
M. Permits - No work will be done without first obtaining the necessary permit or permits issued by the City Building Inspection Department.
N. Eligible Contractors - Borrower will award contracts for rehabilitation work only to contractors who are registered and licensed by the State of 49 Item 3.
CalHome Housing Rehabilitation 19
California. Applicable-lien releases are to be obtained by the contractors and submitted to the City before final disbursement can be made.
O. Hold Harmless - Borrower will hold City harmless from any injuries to borrower’s property or personal belongings during the rehabilitation of the property.
P. Owner Responsibilities of Rehabilitation Work - Borrower must be willing to ensure the building will meet the minimum rehabilitation standards.
1. In the event of borrower’s or his/her agent’s failure to perform, City will cause satisfactory completion of the remaining work. Any loss to City, attributable to this failure to perform could constitute a lien on the property and would result in an increase in the loan.
Renegotiation of the loan will establish a revised payment plan.
2. Borrower also agrees to maintain the security of the rehabilitation loan in a decent, safe, and sanitary condition, following completion of the rehabilitation work.
6.03 LOAN ASSUMPTION
The CalHome Loan is not assumable.
6.04 PERMITTED LOAN TRANSFERS
The CalHome Loan is not assumable except under the following limited circumstances:
A. The transfer of the property to the surviving joint tenant by devise, or descent, or operation of law on the death of a joint tenant.
B. A transfer, in which the transferee is a person who occupies or will occupy the property, which is:
1. a transfer where the spouse becomes an owner of the property.
2. a transfer where in the case that there is no spouse, another family member, within reasonable relations, may become owner of the property assuming they meet all other guidelines under CalHome, the property must be in good condition, and in conjunction with a recommendation from the Director of Business Assistance/Housing Development Department as well as an approval from the Loan Advisory Committee.
3. a transfer resulting from a decree of dissolution of marriage, legal separation agreement, or from an incidental property settlement agreement by which the spouse becomes an owner of the property;
4. a transfer into an inter vivos trust which the borrower is and remains the beneficiary and occupant of the property.
50 Item 3.
CalHome Housing Rehabilitation 20
6.05 CHANGES IN BORROWER STATUS
All loans will become due and payable when:
A. Use of the property changes from residential too commercial.
B. The term of the loan expires.
C. The work itemized in the Property Rehabilitation Work Write-up is not completed within contract term, or a reasonable time thereafter.
D. The owner significantly deviates from the Property Rehabilitation Work Write-up without consent of City.
E. The property becomes non-owner occupied.
6.04 CANCELLATION AND ACCELERATION OF AMOUNTS DUE
At its option, City or its designee reserve the right to cancel and terminate this rehabilitation loan, by sending written notice of cancellation to applicant at his/her mailing address as set forth in the application if, for a period of 45 days from the date of the rehabilitation loan approval, applicant will have failed or refused to cause the commencement of physical rehabilitation work on his/her property, or if the applicant will have failed or refused to comply with such rehabilitation work within a reasonable time. City and/or lenders’ failure to exercise this right will not be deemed a waiver thereof, as long as the rehabilitation work remains incomplete.
6.05 LOAN PREPAYMENT
All loans may be repaid at any time, in whole or in part, with no repayment penalty.
6.06 DEFAULT AND FORECLOSURE
City is authorized to declare, at its option, all or any part of such indebtedness immediately due and payable should any of the following events occur:
A. Nonperformance by the Trustor of any of the terms and conditions of the Deed of Trust, Promissory Note, and/or Loan Repayment Agreement, or of any other agreement heretofore, herewith or hereafter made by the Trustor with the beneficiary, in connection with such indebtedness, after Trustor has been given notice by the beneficiary of such nonperformance.
B. Failure of Trustor to perform any covenant, agreement, term or condition in any instrument creating a lien upon the conveyed property, or any part thereof, which will have priority over the lien of the Rehabilitation Loan Deed of Trust.
51 Item 3.
CalHome Housing Rehabilitation 21
C. Beneficiary’s discovery of Trustor’s failure in any application of Trustor to beneficiary’s, to disclose any fact deemed by beneficiary to be material, or in the making therein that would have prevented the Trustor from being eligible for the rehabilitation loan program, or in any of the agreements entered into by Trustor with the beneficiary (including, but not limited to, the Note, this Deed of Trust, and Loan Repayment Agreement) of any misrepresentation by, on behalf of, or for the benefit of the Trustor.
D. Upon default by Trustor in payment of any indebtedness secured hereby, or in performance of any agreement hereunder, beneficiary may declare all sums secured hereby immediately due and payable, by delivery to Trustor of written declaration of default and demand for sale, and of written notice of default and of election to cause the property to be sold, which notice Trustee will cause to be duly filed for the record. Beneficiary will also deposit with Trustee, this Deed, the Note, and all documents evidencing expenditures secured hereby.
After the lapse of such time as may then be required by law and following the recordation of said Notice of Default and Notice of Sale, Trustor will sell said property at the time and place filed by it in said Notice of Sale, at public auction to the highest bidder, for cash in lawful money of the United States, payable at time of sale. Any person, including Trustor, Trustee or beneficiary, may purchase at the sale. Trustee will apply the proceeds of sale to the payment of:
1. The expenses of such sale, together with the reasonable expenses of this Trust, which will include legal fees if any are incurred;
2. Cost of any evidence of title procured in connection with such sale, and revenue stamps on Trustee’s Deed;
3. All sums expended under the terms hereof, not then repaid, with accrued interest at the rate provided on the principal debt;
4. All other sums then secured hereby; and
5. The remainder, if any, to the person or persons legally entitled thereto.
E. All foreclosure proceedings must be initiated by resolution of the City Council authorizing the Mayor to execute a Notice of Default.
LOAN ADVISORY COMMITTEE
7.01 LOAN ADVISORY COMMITTEE PURPOSE AND COMPOSITION
52 Item 3.
CalHome Housing Rehabilitation 22
A. Loan Advisory Committee Purpose - The function of the Loan Advisory Committee will be to review and act on applications recommended by Housing Rehabilitation Program staff for financing. The Loan Advisory Committee will review applications in terms of eligibility, compliance with all program requirements, consistency of staff recommendations regarding terms and type(s) of assistance provided. The Committee will also review the proposed loan package and, if appropriate, recommend changes in loan terms and type(s) of assistance to be provided.
In the event of a borrower’s death, the Loan Advisory Committee may approve a loan assumption as it pertains to the heir of the deceased provided that all guidelines are met stated under 6.04 Permitted Loan Transfers.
B. Composition - The Committee will consist of three (3) members of the City Council to be appointed by majority vote of the City Council for a maximum two (2) year term; two (2) individuals that reside in the Oroville City limits and/or own a business or work within the Oroville City limits to be appointed by the City Council for a maximum two (2) year term, and two individual alternates to be appointed by the City Council for a maximum two (2) year term, and the Business Assistance/Housing Development Director and Finance Director as exofficio members without a vote.
7.02 APPEALS BOARDS
Applicants Denied Financial Assistance - Applicants denied Housing Rehabilitation financial assistance or dissatisfied with financing decisions may request a review hearing with a three (3) member Appeals Board consisting of the Chairperson and two (2) Oroville City Council members to be appointed by the Chairperson. A request for review must be submitted, in writing within fifteen (15) days following notification to the applicant of the Loan Advisory Committee’s decision by the Housing Rehabilitation Program staff. The request must detail the disputed Loan Committee decision, the reason given for any denial of assistance, and the action desired by the applicant to resolve the problem.
If the problem cannot otherwise be resolved by Housing Rehabilitation Program staff, the Manager Director of Business Assistance/Housing Developmentwill request the Mayor to arrange for a meeting of the Appeals Board. The meeting or review hearing must be held within 30 days of receipt of the applicant’s written request by the Manager Director of Business Assistance and Housing Development. Other than by members of the Appeals Board, the hearing will be attended by at least one Loan Advisory Committee member, the applicant, the Mayor, and the ManagerDirector of Business Assistance and Housing Development. The Appeals Board will Formatted: Font: Not Bold
Formatted: Justified
Formatted: Font: Not Bold
53 Item 3.
CalHome Housing Rehabilitation 23
determine if reconsideration should be given to the applicant by Program Officials and will specify the guidelines to be used in the re-evaluation.
Contractor/Property Owner Disputes - City of Oroville and/or Community Development/Housing DivisionBusiness Assistance and Housing Development staff will not act on behalf of the contractor or owner to resolve disputes of the contractor and owner arising during the course of construction. If disputes can not be resolved between the owner and contractor parties will be advised to contact the State Contractors Licensing Board, to pursue alternatives dispute resolution, or to seek the advice of a private attorney.
AFTER REHABILITATION PROPERTY
9.01 PROPERTY MAINTENANCE
All City Housing Rehabilitation Program loans require the borrower:
A. To protect and preserve said property and to maintain it in good condition and repair.
B. Not to remove, demolish, or materially alter any building or any improvement thereon, nor change or alter both the terms and conditions of existing lease of the premises, or the present character of said property.
C. To complete or restore promptly and in a quality manner which equals or exceeds construction standards any building or improvement that may be constructed, damaged, or destroyed thereon and pay when due all costs incurred therefore, and to comply with all of the terms of any building loan agreement between Trustor and Beneficiary.
D. Not to commit waste of the property.
E. To comply with all laws, covenants, conditions, or restrictions affecting the property.
F. To cultivate, irrigate, fertilize, fumigate, prune and do other actions from the character or use of said property as may be reasonably necessary; the specific enumerations herein not excluding the general.
These conditions help assure that the property does not revert to its prerehabilitation state. It will be strictly enforced.
9.02 STEPS FOR ASSURING PROPERTY MAINTENANCE
Formatted: Font: Not Bold
Formatted: Justified
Formatted: Font: Not Bold
Formatted: Font: Not Bold
54 Item 3.
CalHome Housing Rehabilitation 24
A. Provide the borrower in writing:
1. A list of needed repairs or maintenance items.
2. A recommendation as to a solution to the deficiencies.
3. A request that the repairs be performed within 60 days.
B. At the end of the 60-day span, Housing Rehabilitation Program staff will inspect the property. If the needed repairs have not been performed, staff will set an appointment with the borrower to inspect the property and discuss why maintenance has not been performed. If the borrower is unable to afford to make the needed repairs, and if the repairs represent new building deficiencies not covered by the original rehabilitation, additional Housing Rehabilitation Program funds may be provided, from sources other than the CalHome Program.
C. Following the visit and inspection, the borrower will be given 60 days to make the necessary repairs. The borrower will be given written notice at the start of this phase that if repairs are not performed within 60 days they will be considered to be in default.
D. If repairs are not performed within 60 days of the notice as outlined in Item C., the City may begin foreclosure proceedings.
55 Item 3.
CalHome Housing Rehabilitation 25
APPENDIX A
Title 25 Section 6914 Gross Income Inclusions
“Gross Income’ shall mean the anticipated income of a person or family for the twelve-month period following the date of determination of income.
“Income” shall consist of the following:
(a) Except as provided in subdivision (b), “Exclusions”, all payments from all sources received by the family head (even if temporarily absent) and each additional member of the family household who is not a minor shall be included in the annual income of a family. Income shall include, but not be limited to:
(1) The Gross amount, before any payroll deductions, of wages and salaries, overtime pay, commissions, fees, tips and bonuses;
(2) The net income from operation of a business or profession or from rental or real or personal property (for this purpose, expenditures for business expansion or amortization of capital indebtedness shall not be deducted to determine the net income from a business);
(3) Interest and dividends;
(4) The full amount of periodic payments received from social security, annuities, insurance policies, retirement funds, pensions, disability or death benefits and other similar types of periodic receipts;
(5) Payments in lieu of earnings, such as unemployment and disability compensation, worker’s compensation and severance pay
(6) Public Assistance. If the public assistance payment includes an amount specifically designated for shelter and utilities which is subject to adjustment by the public assistance agency in accordance with the actual cost of shelter and utilities, the amount of public assistance income to be included as income shall consist of:
(A) The amount of the allowance or grant exclusive of the amount specifically designated for shelter and utilities, plus
(B) The maximum amount which the public assistance agency could in fact allow for the family for shelter and utilities,
(7) Periodic and determinable allowances such as alimony and child support payments, and regular contributions or gifts received from persons not residing in the dwelling; 56 Item 3.
CalHome Housing Rehabilitation 26
All regular pay, special pay and allowances of a member of the Armed Forces (whether or not living in the dwelling) who is head of the family or spouse.
APPENDIX B
Title 25 Section 6914 Gross Income Exclusions
(b) The following items shall not be considered as income:
(1) Casual, sporadic or irregular gifts;
(2) Amounts which are specifically for or in reimbursement of the cost of medical expenses; (3) Lump-sum additions to family assets, such as inheritances, insurance payments (including payments under health and accident insurance and worker’s compensation), capital gains and settlement for personal or property losses; (4) Amounts of educational scholarships paid directly to the student or to the educational institution, and amounts paid by the government to a veteran for use in meeting the cost of tuition, fees, books and equipment. Any amounts of such scholarships, or payments to veterans not used for the above purposes of which are available for subsistence are to be included in income;
(5) The special pay to a serviceman head of a family away form home and exposed to hostile fire;
(6) Relocation payments made pursuant to federal, state, or local relocation law; (7) Foster childcare payments;
(8) The value of coupon allotments for the purchase of food pursuant to the Food Stamp Act of 1964 which is in excess of the amount actually charged the eligible household; (9) Payments received pursuant to participation in the following volunteer programs under the ACTION Agency:
(A) National Volunteer Antipoverty Programs which include VISTA, Service-Learning Programs and Special Volunteer Programs.
(B) National Older American Volunteer Programs for persons aged 60 and over which include Retired Senior Volunteer Programs, Foster Grandparent Program, Older American Community Services Program, and National Volunteer Program to Assist Small Business Experience, Service Corps of Retired Executive (SCORE) and Active Corps of Executives (ACE).
57 Item 3.
CalHome Housing Rehabilitation 27
58 Item 3.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: PATRICK PIATT, COMMUNITY DEVELOPMENT DIRECTOR
WES ERVIN, CITY PLANNER
RE: SECOND READING OF ORDINANCE 1895 WITH AD HOC CITIZEN
BUSINESS ADVOCACY COMMITTEE RECOMMENDATIONS
REGARDING THE STREAMLINING OF CERTAIN BUSINESS
LICENSE AND PLANNING PERMITS TO REDUCE THE COST AND
PROCESSING TIME FOR APPLICANTS
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider adopting Ordinance No. 1895 with changes to Oroville Municipal Code sections 17.04.060, 17.16.120, 17.16.180, and Tables 17.34.020-1,
17.28.010-1, 17.32.010-1, AND 17.36.010-1, for the purpose of streamlining certain business permits to reduce the time and cost of applying.
DISCUSSION
The Council will review Zone Change ZC25-01 the latest code changes recommended by the Ad Hoc Citizen Business Advocacy Committee, which were approved by the Planning Commission at a Special Meeting on March 5, 2026, and the City Council on April 7, 2026.
The recommended changes are outlined below. Specific code changes in the tables and codes are in the attached ordinance.
Changes include:
Tattooing and body art are Administrative permits instead of use permits. Short term rentals are added and are now regulated.
Pet shops are Administrative permits instead of Use permits with new standards of care.
Animal grooming permitting is modified in certain zones. Florists are added to the definition of General Retail. Al fresco dining is allowed in the OF (Office) zone.
Tier 2 & 3 Solar permits would not be allowed in C1 and CN Zones 59 Item 4.
Smoke shops would not be allowed in the Office Zone.
Commercial child-care centers would not be allowed in industrial districts unless operated by an employer in that district for their own employees. Libraries and museums would be allowed in MXD and MXN zones.
FISCAL IMPACT
None.
ACTION REQUESTED -
ADOPT ORDINANCE NO. 1895 - AN ORDINANCE OF THE CITY COUNCIL OF
THE CITY OF OROVILLE AMENDING OROVILLE MUNICIPAL CODE
SECTIONS 17.04.060, 17.16.120, 17.16.180, AND TABLES 17.34.020-1,
17.28.010-1, 17.32.010-1, AND 17.36.010-1.
ATTACHMENTS
1. Ordinance No. 1895
60 Item 4.
CITY OF OROVILLE
ORDINANCE NO. 1895
AN ORDINANCE OF THE CITY OF OROVILLE CITY COUNCIL APPROVING ZONING CODE AMENDMENT ZC25-01 WITH CERTAIN ZONING CODE CHANGES TO REDUCE THE COST AND PROCESSING TIME FOR APPLICANTS—INITIATED BY THE AD HOC
CITIZEN BUSINESS ADVOCACY COMMITTEE
WHEREAS, The City Council has created the ad hoc Citizen Business Advocacy Committee; and
WHEREAS, the Citizens Advisory Committee and the Planning Commission met several times to research, conduct interviews and discuss potential improvements to the City’s zoning code; and
WHEREAS, at a duly noticed public hearing, the Planning Commission considered the comments and concerns of public agencies, property owners, and members of the public who are potentially affected by the code changes described herein and also considered the City’s staff report regarding the request.
WHEREAS, the Commission determined that this action is exempt from CEQA; and WHEREAS, the Planning Commission recommends to the City Council changes to the Master Fee Schedule, to Oroville Municipal Codes17.04.060, 17.16.120, and 17.16.180, and to Tables 17.34.020-1, 17.28.010-1, 17.32.010-1, and 17.36.010-1.
The City Council of the City of Oroville does hereby ordain as follows:
SECTION 1. The following amendments to Oroville Municipal Code Ch. 17 are approved:
A) OMC 17.04.060 G. Definitions, “G.” General retail is amended to read as follows:
General retail. A retail establishment that sells a variety of merchandise and is not otherwise identified in this title as a unique retail use, including, but not limited to, antique stores, bookstores, drugstores, florists/garden shops, hobby shops, secondhand stores, retail bakeries, hardware stores, appliance and electronics stores and any use of like kind or character.
B) OMC 17.04.060 P. Definitions, “P.” Personal services-low-impact is amended to read as follows:
Personal services—low-impact. A personal services establishment that tends to create minimal adverse impacts for its surroundings, including, but not limited to, clothing rental, dry-cleaning services with no on-site dry-cleaning equipment, estheticians, permanent makeup artists, tattoo artists, micropigmentation, body piercing, certified massage therapists, laundromats, tailors, tanning salons and other uses of like kind or character. 61 Item 4.
C) OMC 17.04.060 P. Definitions, “P.” Personal services-moderate-impact is amended to read as follows:
Personal services-moderate-impact. A personal services establishment that may tend to attract criminal activity or reduce property values when found near similar establishments, and that may need to be dispersed in order to reduce these potential negative impacts. The term "moderate-impact personal services" includes, but is not limited to, check-cashing stores, pawnshops, psychics, spas and hot tubs for hourly rental, tattoo and body piercing parlors and other uses of like kind or character.
D) OMC 17.04.060 P. Definitions, “P.” Professional Office is amended to read as follows:
Professional office. An office used by persons who provide services that require a state license or certificate, including, but not limited to, accountants, architects, dentists, doctors, engineers, lawyers, medical estheticians, permanent makeup artists, certified massage therapist, and real estate agents. The term "professional office" shall not include any facility that provides intensive medical treatment or overnight lodging for persons, such as a hospital; any facility that provides permanent or temporary boarding of animals, such as a veterinary office or kennel; any use that is considered a "personal service," as defined in this title; or any adult-oriented business.
E) OMC 17.04.060 S. Definitions, “S.” Short-term rental is added to this Chapter as follows:
Short-term rental. A furnished residential structure, or a portion of one, rented out for a brief period, typically 30 consecutive days or less, and where meals are typically not provided.
A short-term rental with more than 5 guest rooms shall be considered a hotel or motel, as applicable. A Short-term rental is responsible to pay transient occupancy tax per Oroville Municipal Code Chapter 3.20.
F) Paragraph G. Standards of Care for Pet Shops and Kennels shall be added to OMC 17.16.120 Animal Keeping as follows:
G. Standards of Care for Pet Shops and Kennels
A. Primary enclosures.
1. In addition to those standards of care outlined in Lockyer-Polanco-Farr Pet Protection Act (California Health and Safety Code Section 122125 et seq.), the Polanco-Lockyer Pet Breeder Warranty Act (California Health and Safety Code Section 122045 et seq.), the Pet Store Animal Care Act (California Health and Safety Code Section 122350 et seq.), and the Animal Welfare Act ("AWA") (7 U.S.C. Section 2131 et seq.), Pet Shop and Kennel must adhere to the following guidelines:
a. A primary enclosure, as defined under § 7.24.020, must be structurally sound and maintained in a safe, working condition to properly confine animals, prevent injury, keep other animals out, and enable the animals to remain dry and clean. There must not be 62 Item 4.
any sharp edges, gaps or other defects that could cause an injury or trap a limb or other body part. Secure latches or other closing devices must be present. Wire-mesh bottoms or slatted floors in cages are not acceptable for primary enclosures for cats, rabbits, or dogs.
b. The primary enclosure should protect animals from disease exposure, provide good air quality, and be readily cleaned and disinfected. Enclosures should facilitate the monitoring of health and behavior and permit efficient and low-stress daily care.
Enclosures that permit care and cleaning without removal of the animal (e.g. double-sided or compartmentalized enclosures) should be provided for recently admitted or ill animals and those who are younger than twenty (20) weeks of age.
c. A primary enclosure shall permit the provision of clean water and food without contamination from urine, feces or litter and must allow animals to sit, sleep and eat away from areas of their enclosures where they defecate and urinate. Cats and rabbits should be provided with a litter box that will comfortably accommodate their entire body. Elevated resting places should be provided whenever possible, as long as this would not restrict animal movement within the enclosure. A soft resting place should be made available for all animals to provide comfort as well as prevent pressure sores from developing. Primary enclosures should allow animals to see out but should also provide at least some opportunity to avoid visual contact with other animals.
d. Primary enclosures must provide animals with the opportunity to express normal behavior, such as (depending on species and housing unit) hiding, perching, walking, running, jumping, scratching, playing, and interacting with or avoiding conspecifics and people. At minimum, primary enclosures shall provide sufficient space to allow each animal, regardless of species, to make normal postural adjustments e.g. to turn freely and to easily stand, sit, stretch, move their head, without touching the top of the enclosure, lie in a comfortable position with limbs extended, move about and assume a comfortable posture for feeding, drinking, urinating and defecating. In addition, cats and dogs should be able to hold their tails erect when in a normal standing position.
e. Excreta shall be removed from primary enclosures as often as necessary to prevent contamination of the animals contained therein and to control disease hazards and odors. When water or cleaning and disinfecting products will be sprayed in or near the area of the primary enclosure, animals must be removed from the 63 Item 4.
cage or kennel, or separated from the area being cleaned by a solid partition to prevent splatter or soaking of the animal. It is an unacceptable practice to spray down kennels or cages while animals are inside them. Animals shall not be placed in empty primary enclosures previously inhabited by other animals unless the enclosure has first been cleaned and disinfected.
f. Animals showing signs of contagious illness shall be removed from rooms and enclosures containing healthy animals and housed in a separate isolation room.
g. Animals shall not be tied to fences or cages in lieu of being housed in primary enclosures.
h. Vehicles used to transport animals must protect the animals from the elements, provide adequate ventilation and climate control, and be structurally sound to prevent injury to animals. Animals must be transported in compatible groups of the same species. In addition, the transport enclosure must be kept clean and must be of sufficient space to allow the animals to move freely (turn around, lie down, and stand up).
2. Unpermitted primary enclosures.
a. Cages or crates intended for short-term, temporary confinement or travel (e.g. airline crates, transport carriers, cages or crates designed to restrict mobility during a defined period for recovery or treatment including small stainless steel cages less than 2 ft x 2 ft), are unacceptable as primary enclosures. Crates or cages must not be stacked upon each other in a manner that increases animal stress or discomfort, compromises ventilation, or allows waste material to fall from the cage above into the cage below. b. Animals housed in the same primary enclosure shall be maintained in compatible groups, with all of the following additional restrictions:
1. Females shall not be housed in the same primary enclosure with sexually intact males
2. Any animal exhibiting a vicious disposition shall be housed individually in a primary enclosure
3. Immature animals shall not be housed in the same primary enclosure with adults other than their mothers
4. Animals of different species shall not be housed in the same primary enclosures.
64 Item 4.
G) Oroville Municipal Code 17.16.180 Solar Energy Systems is amended to read as follows:
§ 17.16.180. Solar energy systems.
A. Purpose. This section establishes standards for systems that convert solar energy into electricity. These standards allow for an efficient permit process while minimizing potential impacts on neighboring properties.
B. Types of Systems.
1. A "Tier 1" solar energy system means a system only used to power onsite uses. Tier 1 systems include roof-mounted and ground-mounted systems and photovoltaic systems integrated into building materials used in the construction of a structure.
2. A "Tier 2" solar energy system means a ground-mounted system used to power on-site and off-site uses, with less than 50% of the power generated used off-site.
3. A "Tier 3" solar energy system means a ground-mounted system used to power on-site and off-site uses, with 50% or more of the power generated used off-site. Solar systems that cover parking lots are Tier 3.
C. Permitted Locations—Permits Required. Table 17.16.180-1 identifies permits required to establish solar energy systems, and the districts where each type of system is permitted.
Table 17.16.180-1: Permits Required for Solar Energy Systems Permits Required
System Type Residential Districts All Other Districts
Tier 1 Zoning Clearance
Tier 2 Per Table 17.28.010-1
Not Allowed
Administrative Permit
Tier 3 Not Allowed Use Permit
65 Item 4.
D. Maximum Size.
1. The maximum area that may be occupied by a ground-mounted solar energy system is as follows:
a. Tier 1 Systems: One-half acre.
b. Tier 2 Systems: 15% of the parcel size or 5 acres, whichever is less.
c. Tier 3 Systems: 30% of a parcel size or 20 acres, whichever is less.
If no other on-site uses, the maximum lot coverage must align with the maximum coverage for the applicable zone.
2. An applicant may request administrative approval to exceed these maximums on parcels otherwise unfit for conservation or development, as determined by the Community Development Director; e.g., a contaminated property that could most appropriately be used for solar energy generation.
E. Development and Operation Standards.
1. Photovoltaic panel systems shall meet all applicable performance standards of the National Electrical Code, the Institute of Electrical and Electronics Engineers, and the Public Utilities Commission regarding safety and reliability.
2. Ground-mounted photovoltaic panel systems shall comply with the height and setback standards in Table 17.16.180-2.
Table 17.16.180-2: Ground-Mounted Systems, Height, and Setback Standards
Parcel Size Maximum Height Minimum Setback
Less than 2 acres 8 feet As required by district
2 to 10 acres 10 feet As required by district
plus 10 additional feet
in or adjacent to
residential district
Greater than 10 acres 15 feet As required by district
plus 15 additional feet
in or adjacent to
residential district
3. Photovoltaic panel systems attached to a roof may not project more than 3 feet above the roof at its highest point. Projections greater than 3 feet but no more than 12 feet are permitted with the approval of a use permit. 66 Item 4.
4. If the city determines that a Tier 2 or Tier 3 system is abandoned, the property owner must remove all equipment and facilities from the site and return the site to its original condition. The city will consider a Tier 2 or Tier 3 system abandoned if the system stops producing electricity for 24 months, unless the property owner demonstrates to the city's satisfaction that there is no intent to abandon the facility.
H) Table 17.34.020-1, Allowed Uses in Mixed Use Districts, shall be amended to read as follows:
Table 17.34.020-1: Allowed Uses in Mixed-Use Districts
Key
P Permitted use, subject to zoning clearance
AP Administrative permit required
UP Use permit required
S See use-specific regulations for permit requirement
- Use not allowed
67 Item 4.
§ 17.34.020 OROVILLE CODE § 17.34.020
Zoning Districts Use-Specific
Land Use MXD MXN MXC Regulations
Local Food Uses
Neighborhood food
and beverage
sales
AP AP AP 17.16.220
(Neighborhood
food and
beverage sales)
Urban agriculture S S S 17.16.230
(Urban
agriculture)
Public Assembly
Carnival, circus or
fair
AP AP AP 17.16.060
(Temporary
uses and
buildings)
Commercial
recreational
facility—indoor,
10,000 sq. ft. or
less of gross floor
area
UP UP P
Commercial
recreational
facility—indoor,
more than 10,000
sq. ft. of gross floor
area
UP UP UP
Commercial
recreational
facility—outdoor
- - UP
68 Item 4.
Concert or
performance
AP AP AP 17.16.060
(Temporary
uses and
buildings)
Library or museum UPAP UPAP UP
Meeting
facility—10,000 sq.
ft. or less of gross
floor area
P P P
Meeting
facility—more than
10,000 sq. ft. of
gross floor area
UP UP P
Park or playground UP UP UP
School, public UP UP UP
School, private UP UP UP
Training facility UP UP UP
Residential [1]
Caretaker residence UP UP -
Family day care,
large
S S S 17.16.050
(Family day care
homes)
Family day care,
small
P P P 17.16.050
(Family day care
homes)
Home occupation,
low-impact
S S S 17.16.040
(Home
occupation)
Home occupation,
moderate-impact
S S S 17.16.040
69 Item 4.
(Home
occupation)
Mixed-use
development
P P P 17.16.030
(Mixed-use
development)
Multiple-family
dwellings [1]
- P P
Residential care
facility—6 units or
fewer
P P P
Residential care
facility—7 units or
more
UP UP -
Retail
Alcoholic beverage
sales
UP UP UP
Al fresco dining
areas
Al fresco seating
areas
S
S
S
S
S
S
17.12.120
(Al fresco
dining and
seating)
17.12.120
(Al fresco dining
and seating)
Building supply - - -
Equipment and
machinery sales
or rental
- - -
Drive-through
establishment—
pharmacy
-
- UP 17.16.080
(Drive-through
establishments)
70 Item 4.
Drive
-through
establishment all
other uses
-
- UP 17.16.080
(Drive-through
establishments)
Farmers market AP AP AP
Food and
beverage
sales—10,000
sq. ft. or less of
gross floor area
P
PP
Food and
beverage
sales—10,001 to
40,000 sq. ft. of
gross floor area
UP
PP
Food and
beverage
sales—more
than 40,000 sq.
ft. of gross floor
area
UP UP
P
Funeral
merchandise
sales
UP UP UP
Gas station
-
- UP 17.16.070
(Gas stations)
General
retail—10,000
sq. ft. or less of
gross floor area
P
PP
General
retail—10,001 to
40,000 feet of
gross floor area
UP
PP
71 Item 4.
General
retail—more than
40,000 sq. ft. of
gross floor area
- UP UP
Mobile food
vendor
AP AP AP 17.16.150
(Mobile food
vending)
Mobile food
vendor village
- UP UP 17.16.150
(Mobile food
vending)
Pet store UPAP UPAP UPAP 17.16.120.G
(Animal keeping)
Plant nursery or
garden supply
store
UP UP P
Restaurant or
café
P P P
Seasonal holiday
agricultural sales
AP AP AP 17.16.060
(Temporary uses
and buildings)
Shopping center,
1,000 sq. ft. or
less of gross
floor area
P P P
Shopping center,
1,000 sq. ft. or
greater of gross
floor area
P UP P
Smoke shop UP UP UP 17.36.010
72 Item 4.
(Allowed uses in
industrial
districts)
Vehicle
sales—
automobile, new
-
- P
Vehicle sales—
all other
-
- UP
Services
Animal grooming UP S UP S UP S 17.16.120
(Animal keeping)
Animal keeping,
noncommercial
P P P 17.16.120
(Animal keeping)
Bank or financial
service
P P P
Bed and
breakfast
P P P
Business support
service
P P P
Car wash - UP UP 17.16.090
(Car and vehicle
washes)
Catering service P P P
Child day care
center
P P P
Gym P P P
Hospital -- -
Hotel or motel UP - UP
73 Item 4.
Instructional or
production studio
P - P
Kennel -- UP 17.16.120
(Animal keeping)
Mortuary UP - UP
Office—
professional
P P P
Office—all other P P P
Outpatient
Services
UP UP UP
Personal
services— lowimpact
P P P
Personal
services—
moderate-impact
UP UP UP
Temporary real
estate office
AP AP AP 17.16.060
(Temporary uses
and buildings)
Temporary uses
not listed here
S S S 17.16.060
(Temporary uses
and buildings)
Veterinarian UP UP P 17.16.120
(Animal keeping)
Manufacturing, Wholesale, Repair, and Storage
Food or
beverage
production
UP - UP
74 Item 4.
Landscape
material sales
-
- UP
Manufacturing—
20,00 sq. ft. or
less of
gross floor area
0 UP - UP
Metalwork—
10,000 sq. ft. or less
of gross floor area
UP - UP
Mini-storage facility
-
- - 17.44.060
(MS-O: ministorage overlay)
Outdoor storage—
250 sq. ft. or less
-
- P 17.16.140
(Outdoor
storage)
Outdoor storage—
more than 250 sq. ft.
UP UP UP 17.16.140
(Outdoor
storage)
Repair service, large
equipment—20,000
sq. ft. or less of
gross floor area
-
- UP
Repair service,
small appliances
P P P
Transportation and Infrastructure
Parking garage or lot
as primary use
UP UP UP
Public safety facility UP UP UP
Solar energy system,
Tier 1
P P P 17.16.180
(Solar energy
systems)
75 Item 4.
Solar energy system,
Tier 2
AP AP AP 17.16.180
(Solar energy
systems)
Solar energy system,
Tier 3
UP UP UP 17.16.180
(Solar energy
systems)
Utility building or
substation
P P P
Note:
[1] Residential uses in the downtown mixed-use district are permitted only on upper stories above ground floor commercial uses.
76 Item 4.
I) Table 17.28.010-1, Allowed Uses in Residential Districts, shall be amended to read as follows:
Table 17.28.010-1
Allowed Uses in Residential Districts
Key
P Permitted use, subject to zoning clearance
A Administrative permit required
UP Use permit required
S See use-specific regulations for permit requirement
— Use not allowed
Zoning Districts
Land Use UR-10 UR-5 RA RR-1 RR-20 RR-10 RL R-1 R-2 R-3 R-4 RP UseSpecific
Regulations
Public Assembly
Library
or
museum
— — P P P P P P P P P P —
Meeting
facility—
10,0 square
feet or less
of gross
floor area
U
P 00
UP UP UP UP UP UP UP UP UP UP UP —
77 Item 4.
Zoning Districts
Land Use UR10UR-5 RA RR-1 RR-20 RR-10 RL R-1 R-2 R-3 R-4 RP UseSpecific
Regulations
Meeting
facility—more
than 10,000
square feet of
gross floor
area
— — — — — — — UP UP UP UP UP —
Park or
playground
— — P P P P P P P P P P —
School,
private—
elementary,
middle or high
school
— — UP UP UP UP UP UP UP UP UP UP —
School,
public
— — UP UP UP UP UP UP UP UP UP UP —
Residential
Animal
keeping,
noncommercial
P P P P P P P P P P P P 17.16.120
Boardinghouse — — — — — — — — — UP UP UP —
Duplex — — — — — — — — P P P P —
Emergency
shelter
— — — — — — — — — P P — 17.16.210
78 Item 4.
Zoning Districts
Land Use UR-10 UR-5 RA RR-1 RR-20 RR-10 RL R-1 R-2 R-3 R-4 RP UseSpecific
Regulations
Family day
care, large
S S S S S S S S S S S S 17.16.050
Family day
care, small
P P P P P P P P P P P P 17.16.050
Home
occupation,
low-impact
P P P P P P P P P P P P 17.16.040
Home
occupation,
moderateimpact
AP AP AP AP AP AP AP AP AP AP AP AP 17.16.040
Mobile
home
park
UP UP UP UP UP UP UP UP UP UP UP UP —
Multiplefamily
dwellings
— — — — — — — — P P P P —
Residential
care
facility—6
units or
fewer
P P P P P P P P P P P P —
79 Item 4.
Zoning Districts
Land Use UR-10 UR-5 RA RR-1 RR-20 RR-10 RL R-1 R-2 R-3 R-4 RP UseSpecific
Regulations
Residential
care facility—
7 units or
more
— — — — — — — — — UP UP —
Second
dwelling unit
AP AP AP AP AP AP AP AP AP AP AP AP 17.16.010
Single-family
dwelling,
attached
— — — — — — — — P P P P —
Single-family
dwelling,
detached
P P P P P P P P P — — — —
Single- family
manufactured
home not
on
permanent
foundation
P P — — — — — — — — — — —
80 Item 4.
Zoning Districts
Land Use UR-10 UR-5 RA RR-1 RR-20 RR-10 RL R-1 R-2 R-3 R-4 RP UseSpecific
Regulations
Singlefamily
manufactured
home on
permanent
foundation
P P P P P P P P P — — — —
Singleroom
occupancy
— — — — — — — — — UP UP — —
Temporary
use of
mobile
home or
recreational
vehicle as
singlefamily
dwelling unit
AP AP AP AP AP AP AP AP AP AP AP AP 17.16.060
Transitional
housing
— — — — — — — — — UP UP — —
Animal
grooming
P/UP— P/UP— P/UP— P/UP— P/UP— P/UP P/UP P/UP P/UP P/UP P/UP P/UP Note 1,
17.16.120
Bed and
breakfast
UP UP UP UP UP UP UP UP UP UP UP UP —
81 Item 4.
Zoning Districts
Land Use UR-10 UR-5 RA RR-1 RR-20 RR-10 RL R-1 R-2 R-3 R-4 RP UseSpecific
Regulations
Child day
care center
— — UP UP UP UP UP UP UP UP UP UP —
Mortuary — — — — — — — — — — — UP —
Office—
professional
— — — — — — — — — — — P —
Outpatient
services
— — — — — — — — — — — — —
Substance
abuse
counseling
— — — — — — — — — — — — —
Temporary
uses
S S S S S S S S S S S S 17.16.060
Local Food Uses
Agriculture P P P - - - - - - - - - 17.16.100
(Agricultural
uses)
Neighborhood
food and
beverage
sales
AP - - - - - AP AP AP AP AP AP 17.16.220
(Neighborhood
food and
beverage
sales)
Urban
agriculture
S S S S S S S S S S S 17.16.230
(Urban
agriculture)
82 Item 4.
Zoning Districts
Land Use UR-10 UR-5 RA RR-1 RR-20 RR-10 RL R-1 R-2 R-3 R-4 RP Use-Specific
Regulations
Transportation and Infrastructure
Public
safety
facility
UP UP UP UP UP UP UP UP UP UP UP UP
Solar
energy
system,
Tier 1
P P P P P P P P P P P P 17.16.180
(Solar
energy
systems)
Solar
energy
system,
Tier 2
- - - - - - - - - UP AP UP AP UP AP 17.16.180
(Solar
energy
systems)
Solar
energy
system,
Tier 3
- - - - - - - - - - - - 17.16.180
(Solar
energy
systems)
Utility
building or
substation
UP UP UP UP UP UP UP UP UP UP UP UP
Note 1: Animal grooming is a permitted use with a Home Occupation permit unless more than 3 customers visit the residence in a day, which then triggers a Use Permit
83 Item 4.
84 Item 4.
J) Table 17.32.010-1, Allowed Uses in Commercial districts, shall be amended to read as follows:
Table 17.32.010-1
Allowed Uses in Commercial Districts
Key
P Permitted use, subject to zoning
clearance
AP Administrative permit required
UP Use permit required
S See use-specific regulations for permit
requirement
- Use not allowed
Zoning Districts
Land Use CN C-1 C-2 CH CLM OF Use Specific
Regulations
Local Food Uses
Neighborhood
food and
beverage sales
AP S AP AP AP AP AP 17.16.220
(Neighborhood
food and
beverage sales)
Urban agriculture S S S S S S 17.16.230
(Urban
agriculture)
Public Assembly
Carnival, circus
or fair
AP AP AP AP AP UP 17.16.060
(Temporary
uses and
buildings)
Commercial
recreational
facility-indoor,
10,000 sq. ft. or
less of gross floor
area
UP P P P UP - -
Commented [DR1]: There are portions of this table
with anchors/sections from the source which need
to be removed and the text changed to Arial 12pt.
There are also section breaks and orphan
headers/footers here that need to be removed.
85 Item 4.
Commercial
recreational
facility-indoor,
more than 10,000
sq. ft. of gross
floor area
- UP P UP UP - -
Commercial
recreational
facility-outdoor
- UP P - UP - -
Concert or
performance
AP AP AP AP AP - 17.16.060
(Temporary
uses and
buildings)
Library or
museum
- UP UP UP UP UP -
Meeting facility—
10,000 sq. ft. or
less of gross floor
area
P P P UP UP P -
Meeting facility—
more than 10,000
sq. ft. of gross
floor area
- UP P - UP UP -
Park or
playground
UP UP UP UP UP UP -
School, public - P P UP UP UP -
School, private - P P - - UP -
Training facility - UP UP - - UP -
Residential
86 Item 4.
Caretaker
residence
UP UP UP UP UP - -
Family day care,
large
S S S S S - 17.16.050
(Family day
care homes)
Family day care,
small
P P P P P - 17.16.050
(Family day
care homes)
Home occupation,
low-impact
P P P - - - 17.16.040
(Home
occupations)
Home occupation,
moderate-impact
AP AP AP - - - 17.16.040
(Home
occupations)
Residential care
facility—6 units
or fewer
P P P P P - -
Residential care
facility—7 units
or more
- - - - - - -
Retail
Alcoholic
beverage sales
UP UP UP - - - -
Al fresco dining
areas
S S S S S S- 17.12.120
(Alfresco dining
and seating)
Al fresco seating
areas
S S S S S S- 17.12.120
(Al fresco
dining and
seating)
87 Item 4.
Building supply - - P - P - -
Cannabis retail - - - - - -
Equipment and
machinery sales
or rental
- - P - P - -
Drive-through
establishment—
pharmacy
P P P P P - 17.16.080
(Drive-through
establishmen
Drive-through
establishment—
all other uses
UP UP UP UP UP - 17.16.080
(Drive-through
establishment
Farmers' market AP AP AP AP AP AP 17.16.060
(Temporary
uses and
buildings)
Food and
beverage sales—
10,000 sq. ft. or
less of gross floor
area
P P P P P - -
Food and
beverage sales—
10,001 to 40,000
sq. ft. of gross
floor area
UP P P UP - - -
Food and beverage
sales—more than
40,000 sq. ft. of
gross floor area
- P P UP - - -
Funeral
merchandise
sales
- UP UP - - UP -
88 Item 4.
Gas station - UP P P P - 17.16.070
(Gas stations)
General retail—
10,000 sq. ft. or
less of gross floor
area
P P P P P - -
General retail—
10,001 to 40,000
sq. ft. of gross
floor area
UP P P UP P - -
General retail—
more than 40,000
sq. ft. of gross
floor area
- UP P UP UP - -
Mobile food
vendor
AP AP AP AP AP AP 17.16.150
(Mobile food
vending)
Mobile food
vendor village
UP UP UP - UP - 17.16.150
(Mobile food
vending)
Pet store UP S S UP UP S - 17.16.120
(Animal
keeping)
Plant nursery or
garden supply
store
UP P P P - - -
Restaurant or
café
P P P P P - AP -
Seasonal holiday
agricultural sales
AP AP AP AP AP - 17.16.060
(Temporary
uses and
buildings)
Shopping center UP UP P UP UP - -
89 Item 4.
Smoke shop UP UP UP UP UP UP 17.16.190
(Smoke shops)
Vehicle sales—
automobile new
- UP P UP P -
Vehicle sales—
all other
- - UP UP UP - -
Services
Animal grooming UP P UP P UP P - - - 17.16.120
(Animal
keeping)
Animal keeping,
noncommercial
P P P P P - 17.16.120
(Animal
keeping)
Bank or financial
service
P P P - P P -
Bed and
breakfast
UP S P S P S P S - - -
Business support
service
P P P P P P -
Cannabis testing - - - - - -
Car wash - UP P P P - 17.16.090
(Car and
vehicle washes)
90 Item 4.
Catering service - P P - P - -
Child day care
center
P P P UP UP - -
Gym P P P - P - -
Hospital - UP UP - - - -
Hotel or motel - UP P UP UP - -
Instructional or
production studio
P P P - P P -
Kennel - - UP - UP - 17.16.120
(Animal
keeping)
Mortuary - UP UP UP P UP -
Office—
professional
P P P - P P -
Office—all other P P P - P P -
Outpatient
services
UP P P - - - -
91 Item 4.
Personal
services—lowimpact
P P P P P - -
Personal
services—
moderate impact
-
UP UP UP UP UP -
Recreational
vehicle (RV) park
- - UP P UP - -
Substance abuse
counseling
- - P - P - -
Temporary real
estate office
AP AP AP AP AP AP 17.16.060
(Temporary
uses and
buildings)
Temporary uses
not listed here
S S S S S S 17.16.060
(Temporary
uses and
buildings)
Veterinarian UP UP P - P - 17.16.120
(Animal
keeping)
Manufacturing, Wholesale, Repair and Storage
Food or beverage
production
- UP UP - UP - -
Landscape
material sales
- UP UP - P - -
Manufacturing—
20,000 sq. ft. or
less of gross floor
area
- UP P - P P - -
Manufacturing—
more than 20,000 sq.
ft. of gross floor
area
- - UP - UP UP - -
92 Item 4.
Metalwork—
20,000 sq. ft. or
less of gross floor
area
- UP UP P P UP -
-
Metalwork—more
than 20,000 sq.
ft. of gross floor
area
- - UP UP UP UP -
-
Mini-storage
facility
S S S - S - 17.16.060
17.44.060
(MS-O
Mini-storage
overlay)
Outdoor
storage—250 sq.
ft. or less
P P P P P P 17.16.140
(Outdoor
storage)
Outdoor
storage—more
than 250 sq. ft.
UP UP P UP P UP 17.16.140
(Outdoor
storage)
Recycling facility
or center
- UP P - P - -
Repair service,
large
equipment—
20,000 sq. ft. or
less of gross floor
area
UP UP P P P -
-
Repair service,
large equipment—
more than 20,000
sq.
ft. of gross floor
area
- - UP UP UP - -
Repair service,
small appliances
P P P - P - -
Research
laboratories
- - UP - UP UP -
93 Item 4.
Scrap or
dismantling yard
- - - - UP - -
Vehicle service or
repair
- UP P P P - -
Warehousing - - - - P - -
Transportation and Infrastructure
Parking garage
or lot as primary
use
UP UP P - UP UP -
Public safety
facility
UP UP UP UP UP UP -
Solar energy
system, Tier 1
P P P P P P 17.16.180
(Solar energy
systems)
Solar energy
system, Tier 2
AP - AP - AP AP AP AP 17.16.180
(Solar energy
systems)
Solar energy
system, Tier 3
UP - UP - UP UP UP UP 17.16.180
(Solar energy
systems)
Utility building or
substation
P P P P P P -
Vehicle depot -
94 Item 4.
K) Table 17.36.010-1, Allowed Uses in Industrial districts, shall be amended to read as follows:
Table 17.36.010-1
Allowed Uses in Industrial Districts
Zoning Districts
Use
Specific
Land Use ABP M-1 M-2 Regulations
Public Assembly
Carnival, circus or fair AP AP AP 17.16.060
Commercial
recreational facility
— UP UP
Concert or
performance
AP AP AP 17.16.060
Library or museum — UP UP
Meeting facility — UP UP
Park or playground — UP UP
Training facility UP P P
Residential
Caretaker
dwelling unit
P P P
Retail
Adult-oriented
business
— S S 17.16.110
Building supply — UP UP
Cannabis retail — — —
Drive-through
establishment
— UP UP 17.16.080
Equipment and
machinery sales
or rental
— UP P
95 Item 4.
Farmers market AP AP AP 17.16.060
Food and
beverage sales—
10,000 sq. ft. or
less of gross
floor area
P P P
Food and
beverage sales—
more than
10,000 sq. ft. of
gross floor area
— — —
Gas station — UP UP 17.16.070
General retail—
10,000 sq. ft. or
less of gross
floor area
UP UP UP
General retail—more
than 10,000 sq. ft. of
gross floor area
— UP UP
Mobile food vendor — S S 17.16.150
Mobile food vendor
village
UP UP UP 17.16.150
Plant nursery or
garden supply store
— UP UP
Restaurant or café UP UP UP
Seasonal holiday
agricultural sales
AP AP AP 17.16.060
Smoke shop — UP UP 17.36.010
Vehicle sales — UP UP
Services
Business support
service
P P P
Car wash — UP UP
96 Item 4.
Catering service — UP UP
Child day care UP - UP - UP -
Instructional or
production studio
— P P
Kennel — UP UP 17.16.120
Marijuana dispensary — — —
Office—professional P UP UP
Office—all other P UP UP
Outpatient
services
— — —
Substance abuse
counseling
— — —
Temporary real
estate office
AP AP AP 17.16.060
Temporary uses
not listed here
S S S 17.16.060
Veterinarian — P P 17.16.120
Manufacturing, Wholesale, Repair and Storage
Cannabis
cultivation
— — —
Cannabis
distribution
— — —
Cannabis
manufacturing
— — —
Cannabis
microbusiness
— — —
Cannabis
nursery
— — —
Cannabis testing — — —
Food or
beverage
production
— UP P
97 Item 4.
Landscape
material sales
— UP P
Manufacturing—40,000
sq. ft. or less of gross
floor area
P P
Manufacturing— more
than 40,000 sq. ft. of
gross floor area
UP UP P
Metalwork—40,000 sq.
ft. or less of gross floor
area
P P P
Metalwork—more than
40,000 sq. ft. of gross
floor area
UP UP P
Mini-storage
facility
— S S 17.44.060
Outdoor
storage—500 sq.
ft. or less
P P P 17.16.140
Outdoor
storage—more
than 500 sq. ft.
UP P P 17.16.140
Recycling facility
or center
— P P
Repair service,
large equipment
P P P
Repair service,
small appliances
P P P
Research
laboratory
UP P P
Scrap or
dismantling yard
— — UP
Vehicle services
and repair
— P P
Warehousing P P P
Wholesaling and
distribution
UP P P
Agricultural and Resource-Based Uses
98 Item 4.
Surface mining — — UP Chapter 15.92
Transportation and Infrastructure
Parking garage
or lot as primary
use
— UP UP
Public safety
facility
P P P
Solar energy
system, Tier 1
P P P 17.16.180
(Solar energy
systems)
Solar energy
system, Tier 2
AP AP AP 17.16.180
(Solar energy
systems)
Solar energy
system, Tier 3
UP UP UP 17.16.180
(Solar energy
systems)
Utility building or
substation
P P P
Vehicle depot — P P
END OF ZONING CODE CHANGES
99 Item 4.
SECTION 2. Unless explicitly amended in Section 1, above, all other sections of the Oroville Municipal Code remain unchanged and in full force and effect.
SECTION 3. This ordinance shall become effective on the 30th day after its adoption.
SECTION 4. The City Clerk shall attest to the adoption of this ordinance.
PASSED AND ADOPTED by the City Council of the City of Oroville at a regular meeting on April 21, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
DAVID PITTMAN, Mayor
APPROVED AS TO FORM: ATTEST:
DAVID RITCHIE, Asst. City Attorney KAYLA REASTER, Assistant City Clerk 100
Item 4.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: TIM KABER, PUBLIC WORKS DIRECTOR
RE: HOSTING THE TRAVELING EXHIBIT CHINESE PIONEERS: POWER
AND POLITICS IN EXCLUSION ERA PHOTOGRAPHS AT THE
OROVILLE CHINESE TEMPLE
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider approving the hosting of the traveling exhibition Chinese Pioneers: Power and Politics in Exclusion Era Photographs at the Chinese Temple Museum from August through October 2026.
DISCUSSION
The City of Oroville Museums has been offered the opportunity to host the traveling exhibit Chinese Pioneers: Power and Politics in Exclusion Era Photographs through Exhibit Envoy, a nonprofit organization that circulates museum-quality exhibits to cultural institutions throughout California, and the United States. As a courtesy associated with the Cultural Facilities Curator Vanessa Cantú serving on the Executive Board of Directors for Exhibit Envoy, the $1,000 exhibition booking fee has been waived, leaving the City of Oroville responsible only for shipping costs, at approximately $200 and minor installation efforts.
Drawn exclusively from the California Historical Society collection at Stanford University, the exhibit explores the experiences of Chinese Californians during the decades surrounding the 1882 Chinese Exclusion Act through historic photographs and interpretive text.
The exhibit consists of 11 free-standing retractable banners with translated text available in Spanish and Chinese. The Cultural Facilities Curator plans to augment the exhibit with artifacts and photographs from the Oroville Chinese Temple’s collections to provide local context and strengthen interpretation of Oroville’s Chinese American history. The exhibit 101
Item 5.
is tentatively scheduled to be on display at the Oroville Chinese Temple from August 21 through October 10, 2026.
FISCAL IMPACT
The standard $1,000 exhibit booking fee has been waived.
Costs to the City of Oroville will be limited to shipping of the exhibit materials, approximately $200, and minor installation needs. These costs will be accommodated within the existing museums’ operational budget.
ACTION REQUESTED –
APPROVE HOSTING THE TRAVELING EXHIBIT CHINESE PIONEERS: POWER AND
POLITICS IN EXCLUSION ERA PHOTOGRAPHS AT THE CHINESE TEMPLE MUSEUM FROM AUGUST THROUGH OCTOBER 2026.
ATTACHMENTS
1. Exhibit Envoy Exhibit Information Sheet – Chinese Pioneers: Power and Politics in Exclusion Era Photographs.
102
Item 5.
103
Item 5.
104
Item 5.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR AND COUNCIL MEMBERS
FROM: TIM KABER – DIRECTOR OF PUBLIC WORKS
RE: RECERTIFICATION AND ADOPTION OF 2026 SEWER SYSTEM
MANAGEMENT PLAN
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider adopting Resolution No. 9452 for the recertification and adoption of the 2026 Sewer System Management Plan (SSMP).
DISCUSSION
The City Council approved a contract with Bennet Engineering Services on October 7th, 2025, to update the City of Oroville SSMP. That work has been completed.
The State Water Resources Control Board (SWRCB), through the California Integrated Water Quality System (CIWQS), requires agencies that own or operate sanitary sewer systems to prepare, implement, audit, and recertify an SSMP in compliance with the Statewide General Waste Discharge Requirements (WDR), Order No. 2022-0103-DWQ.
The updated Order requires a comprehensive SSMP audit every three (3) years and SSMP recertification by the governing body every six (6) years.
FISCAL IMPACT
There is no fiscal impact.
ACTION REQUESTED -
ADOPT RESOLUTION NO. 9452 RECERTIFYING AND ADOPTING THE SSMP; AND AUTHORIZE THE MAYOR TO SIGN.
ATTACHMENTS
1. Staff Report from October 2025 requesting the SSMP
2. 2026 SSMP
3. Resolution No. 9452
105
Item 6.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: ALYSSA STUTZ, DIRECTOR OF PUBLIC WORKS
RE: APPROVAL OF CONTRACT WITH BENNETT ENGINEERING FOR
SANITARY SEWER MANAGEMENT PLAN (SSMP) UPDATE AND
AUDIT
DATE: OCTOBER 7, 2025
SUMMARY
Staff recommends approval of a contract with Bennett Engineering Services to conduct the City of Oroville’s Sanitary Sewer Management Plan (SSMP) Update and Audit. The State Water Resources Control Board (SWRCB), through the California Integrated Water Quality System (CIWQS), requires agencies that own or operate sanitary sewer systems to prepare, implement, audit, and recertify an SSMP in compliance with the Statewide General Waste Discharge Requirements (WDR), Order No. 2022-0103-DWQ.
The updated Order requires a comprehensive SSMP audit every three (3) years and SSMP recertification by the governing body every six (6) years. The City of Oroville is now due for its update to remain in compliance. The last update was conducted in 2019.
DISCUSSION
The SSMP is a regulatory document that governs the effective management, operation, and maintenance of the City’s sanitary sewer collection system. Its goals include:
Minimizing the frequency and impact of sanitary sewer overflows (SSOs); Protecting public health and the environment;
Demonstrating responsible asset management of sewer infrastructure.
The audit evaluates the City’s implementation of the SSMP, identifies areas for improvement, and ensures practices align with state requirements and industry best standards. The recertification formally confirms City Council approval of the SSMP update and continued compliance with SWRCB regulations.
Failure to complete the required audit and recertification places the City at risk of 106
Item 6.
enforcement actions, fines, and loss of credibility in state reporting systems (CIWQS).
Bennett Engineering Services has assisted Oroville with sewer planning and compliance in the past and has the expertise and familiarity with the City’s system to efficiently perform the audit and prepare the recertification.
FISCAL IMPACT
Cost for the update and audit are covered in the Sewer Fund - Outside Services 4004000 6360.
ACTION REQUESTED -
Approve a contract with Bennett Engineering Services in an amount not to exceed $25,022 to conduct the City’s required SSMP Update and Audit in compliance with SWRCB Order No. 2022-0103-DWQ, with funding from the Sewer Fund.
ATTACHMENTS
1. Agreement
2. Exhibit A – Proposal
107
Item 6.
Sewer System
Management Plan
Final – March 30, 2026 Adopted – April 21, 2026
108
Item 6.
City of Oroville Page i
Sewer System Management Plan March 30, 2026
Document Version Control
This Sewer System Management Plan (SSMP) is a living document that is anticipated to change over time. This version control sheet is intended to support the City’s efforts to keep the copies of the SSMP that have been assigned to City Staff current. Please contact the Public Works Department prior to making copies for use by others, initiating changes, or for information regarding the current version of this document.
SSMP Version No.: 3
SSMP Version Date: March 30, 2026
SSMP Section
Original Version
Date
Current Version
Date
Introduction October 7, 2019 March 30, 2026
Goals October 7, 2019 March 30, 2026
Organization October 7, 2019 March 30, 2026
Legal Authority October 7, 2019 March 30, 2026
Operations & Maintenance Program October 7, 2019 March 30, 2026 Design and Performance Provisions October 7, 2019 March 30, 2026 Spill Emergency Response Plan October 7, 2019 March 30, 2026 Sewer Pipe Blockage Control
Program
October 7, 2019 March 30, 2026
System Evaluation and Capacity
Assurance, and Capital
Improvements
October 7, 2019 March 30, 2026
Monitoring, Measurement, and
Program Modifications
October 7, 2019 March 30, 2026
Internal Audits October 7, 2019 March 30, 2026
Communications Program October 7, 2019 March 30, 2026
109
Item 6.
City of Oroville Page ii
Sewer System Management Plan March 30, 2026
Table of Contents
Introduction......................................................................................................................1 System Description..........................................................................................................1 Organization of SSMP .....................................................................................................2 Definitions, Acronyms, and Abbreviations .......................................................................2 Section 1. Goals and Introduction...........................................................................7
1.1. Introduction...........................................................................................................7
1.2. WDR Requirements .............................................................................................7
1.3. SSMP Goals.........................................................................................................7 Section 2. Organization............................................................................................8
2.1. Introduction...........................................................................................................8
2.2. WDR Requirements .............................................................................................8
2.3. Organization.........................................................................................................8
2.4. Authorized Representative...................................................................................8
2.5. Responsibility for SSMP Implementation .............................................................8
2.6. SSO Reporting Chain of Communication...........................................................10 Appendix 2-A: SSMP Development, Implementation, and Maintenance Responsibilities ..................................................................................................10 Section 3. Legal Authority........................................................................................1
3.1. Introduction...........................................................................................................1
3.2. WDR Requirements .............................................................................................1
3.3. Municipal Code.....................................................................................................1 Section 4. Operations and Maintenance Program.................................................1
4.1. Introduction...........................................................................................................1
4.2. WDR Requirements .............................................................................................1
4.3. Collection System Maps.......................................................................................1
4.4. Operation and Maintenance Program ..................................................................2
4.5. Rehabilitation and Replacement Plan ..................................................................3
4.6. Training Program..................................................................................................3
4.7. Equipment and Parts Inventory ............................................................................4 Appendix 4-A: Standard Operating Procedure for Sewer Cleaning............................5 Appendix 4–B: Capital Improvement Program ............................................................9 110
Item 6.
City of Oroville Page iii
Sewer System Management Plan March 30, 2026
Appendix 4–C: Major Sewer System Equipment Inventory .......................................10 Section 5. Design and Performance Provisions ....................................................1
5.1. Introduction...........................................................................................................1
5.2. WDR Requirements .............................................................................................1
5.3. Design Criteria......................................................................................................1 Section 6. Spill Emergency Response Plan ...........................................................1
6.1. Introduction...........................................................................................................1
6.2. WDR Requirements .............................................................................................1
6.3. Goals ....................................................................................................................3
6.4. SSO Detection......................................................................................................3
6.5. SSO Response Procedures .................................................................................4
6.6. Recovery and Clean Up .......................................................................................8
6.7. Failure Analysis Investigation.............................................................................11
6.8. SSO Categories .................................................................................................11
6.9. SSO Documentation and Reporting...................................................................11
6.10. Post-SSO Event Debriefing................................................................................20
6.11. Equipment ..........................................................................................................21
6.12. SSO Response Training.....................................................................................21 Appendix 6-A: After Hours/Emergency Contact Info .....................................................22 Appendix 6-B: Sewer Report Form................................................................................23 Appendix 6-C: Sample Fax Form for SSO Reporting....................................................25 Appendix 6-E: Private Property Damage Procedures...............................................27 Appendix 6-F: Methods for Estimating Spill Volume.................................................28 Appendix 6-G: Manhole Overflow Flowrate Guide....................................................31 Appendix 6-H: Sample Warning Sign........................................................................28 Appendix 6-I: Emergency Response Equipment.....................................................29 Section 7. Sewer Pipe Blockage Control Program ................................................1
7.1. Introduction...........................................................................................................1
7.2. WDR Requirements .............................................................................................1
7.3. Nature and Extent of Sewer Pipe Blockage Problem...........................................2
7.4. Sewer Pipe Blockage Source Control Program ...................................................2 Section 8. System Evaluation and Capacity Assurance Plan...............................1
8.1. Introduction...........................................................................................................1 111
Item 6.
City of Oroville Page iv
Sewer System Management Plan March 30, 2026
8.2. WDR Requirements .............................................................................................1
8.3. Evaluation – Sanitary Sewer Master Plan............................................................2
8.4. Design Criteria......................................................................................................2
8.5. Capacity Enhancement Measures – CIP .............................................................2 Section 9. Monitoring, Measurement, and Program Modifications......................1
9.1. Introduction...........................................................................................................1
9.2. WDR Requirements .............................................................................................1
9.3. Performance Measures ........................................................................................1
9.4. Historical Performance Data ................................................................................1
9.5. Baseline Performance..........................................................................................1
9.6. Performance Monitoring and Program Changes..................................................2
9.7. SSMP Updates.....................................................................................................2 Section 10. Internal Audits.........................................................................................1
10.1. Introduction...........................................................................................................1
10.2. WDR Requirements .............................................................................................1
10.3. SSMP Audits ........................................................................................................1 Appendix 10-A: SSMP Audit Checklist .......................................................................2 Section 11. Communication Program.......................................................................1
11.1. Introduction...........................................................................................................1
11.2. WDR Requirements .............................................................................................1
11.3. Communication during SSMP Development and Implementation .......................1
11.4. Communicating Sanitary Sewer System Performance ........................................1
11.5. Communication w/Tributary/Satellite SS Systems ...............................................2 112
Item 6.
City of Oroville Page v
Sewer System Management Plan March 30, 2026
List of Figures
Figure 2-1: Organization Chart ................................................................................2-9 Figure 4-1: CWEA Publication, “Best Practices Cleaning Results”..........................4-8 Figure 6-1: SSO Response Procedure Flow Chart..................................................6-6 Figure 6-2: SSO External Reporting Requirement Flow Charts ............................6-15 List of Tables
Table 3-1: Legal Authority.......................................................................................3-2 Table 4-1: Training Resources ...............................................................................4-4 Table 4-2: Criterion for Coding Debris Found During Cleaning ..............................4-7 Table 5-1: Acceptable Pipe Materials for New Gravity Sewers ..............................5-5 Table 5-2: Minimum Manhole Vacuum Test Time in Seconds ...............................5-6 Table 7-1: FOG-Related SSO Events.....................................................................7-2 Table 9-1: Baseline Performance as of September 9, 2025 covering period of February 8, 2020 through September 9, 2025..........................................................9-2 113
Item 6.
City of Oroville Page 1
Sewer System Management Plan March 30, 2026
Introduction
Background
This Sewer System Management Plan (SSMP) has been prepared in compliance with the State Water Resources Control Board (SWRCB) Order 2022-0103-DWQ, Statewide General Waste Discharge Requirements (WDR’s) for Sanitary Sewer Systems, as adopted by the SWRCB on June 5, 2022. The WDR’s prohibit sanitary sewer overflows (SSOs) and requires the reporting of SSO’s using the statewide electronic reporting system. This SSMP has been prepared for the City of Oroville (City) with assistance from Bennett Engineering Services, Inc (2026 Update).
System Description
The City of Oroville is located in Butte County, approximately 85 miles southeast of Redding and 65 miles north of Sacramento. The City owns and operates a sanitary sewer collection system for the benefit of residents and businesses in the Oroville city limits. The City’s estimated population in 2025 was 19,871 and the City occupies an area of approximately
12.1 square miles. The sanitary sewer crew maintain approximately 66.6 miles of sanitary sewer gravity mains with approximately 1,189 manholes and over 2.1 miles of force main.
The City also maintains seven primary sewer lift stations, one secondary lift station, and two flow meters. The sanitary sewer crew consists of six workers and one manager. Since the last SSMP update, the City has adequately staffed the sanitary sewer crew with knowledgeable and trained crew members. At this time, the crews are meeting or exceeding maintenance expectations and completing many projects before the goal date.
The Sewerage Commission-Oroville Region (SC-OR) provides wastewater treatment and disposal for the Oroville Region through the operation of a treatment plant located on South 5 th Avenue, south of downtown Oroville. Average dry weather wastewater flows (ADWFs) conveyed through the City’s collection system are 1.9 MGD.
The system is expected to grow to approximately 6.45 MGD through build out of the collection system per the Sewer Master Plan Update in 2013 (Carollo). 114
Item 6.
City of Oroville Page 2
Sewer System Management Plan March 30, 2026
Organization of SSMP
The structure of this document follows the section numbering and nomenclature specified in the General Waste Discharge Requirements (WDR). The Sewer System Management Plan (SSMP) includes eleven sections:
1. SSMP Goals and Introduction
2. Organization
3. Legal Authority
4. Operation and Maintenance Program
5. Design and Performance Provisions
6. Spill Emergency Response Plan
7. Sewer Pipe Blockage Control Program
8. System Evaluation and Capacity Assurance Plan
9. Monitoring, Measurement, and Program Modifications
10. Internal Audits
11. Communication Program
Definitions, Acronyms, and Abbreviations
Best Management Practices (BMP’s) - Refers to the procedures employed in commercial kitchens to minimize the quantity of grease that is discharged to the sanitary sewer system.
Examples include scraping food scraps into the garbage can and dry wiping dishes and utensils prior to washing.
Building Sewer - Refers to the piping that conveys sewage within a building or residence.
Butte County Department of Public Health (County Health) Calendar Year (CY)
California Integrated Water Quality System (CIWQS) - Refers to the State Water Resources Control Board online electronic reporting system that is used to report SSOs, certify completion of the SSMP, and provide information on the sanitary sewer system.
Capital Improvement Program (CIP) - Refers to the document that identifies planned capital improvements to the City’s sanitary sewer system.
Certification of SSO Reports - The SWRCB requires the Legally Responsible Official to login to CIWQS within a given time period to electronically sign submitted reports thereby stating that to the best of his/her knowledge and belief, the information submitted is true, accurate, and complete.
City - Refers to the City of Oroville.
Closed Circuit Television (CCTV) - Refers to the process and equipment that is used to internally inspect the condition of gravity sewers.
115
Item 6.
City of Oroville Page 3
Sewer System Management Plan March 30, 2026
Collection System – See Sewer System.
Computerized Maintenance Management System (CMMS) - Refers to software and a database that is used to manage maintenance and condition assessment data including the production of work orders and the recording of work completed.
Dry Weather Flows (DWF’s) – Refers to the average daily volume of wastewater conveyed through the collection system during periods of dry weather (non-rainy season flows) Environmental Protection Agency (EPA) - Refers to the United States Environmental Protection Agency.
Fats, Oils, and Grease (FOG) - Refers to fats, oils, and grease typically associated with food preparation and cooking activities that can cause blockages in the sanitary sewer system.
Fiscal Year (FY)
Food Service Establishment (FSE) - Refers to commercial or industrial facilities where food is handled/prepared/served that discharge to the sewer system.
Force Main - Refers to a pressure sewer used to convey wastewater from a lift station to the point of discharge.
Full-time Equivalent (FTE) - Refers to the equivalent of 2,080 paid labor hours per year by a regular, temporary, or contract employee.
Gallons per Day (gpd)
Gallons per Minute (gpm)
General Waste Discharge Requirements (WDR) - Refers to the State Water Resources Control Board No. 2022-0103-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems, dated June 5, 2022.
Geographic Information System (GIS) - Refers to the City’s system that it uses to capture, store, analyze, and manage geospatial data associated with the City’s sanitary sewer system assets.
Global Positioning System (GPS) - Refers to the handheld unit used to determine the longitude and latitude of sanitary sewer overflows for use in meeting the Online SSO Reporting System reporting requirements.
Grease Removal Device (GRD) - Refers to grease traps or grease interceptors that are installed to remove FOG from the wastewater flow at food service establishments.
Hotspot - A gravity sewer identified as requiring frequent preventive maintenance to reduce the likelihood of SSOs.
Infiltration/Inflow (I/I) - Refers to water that enters the sanitary sewer system from stormwater and groundwater that increases the quantity of flow. Infiltration enters through defects in the sanitary sewer system after flowing through the soil. Inflow enters the sanitary sewer without flowing through the soil. Typical points of inflow are holes in manhole lids and direct connections to the sanitary sewer (e.g. storm drains, area drains, and roof leaders). 116
Item 6.
City of Oroville Page 4
Sewer System Management Plan March 30, 2026
Lateral - See sewer service lateral.
Legally Responsible Official (LRO) - Refers to the individual who has the authority to certify reports and other actions that are submitted through the Online SSO Reporting System.
Manhole (MH) - Refers to an engineered structure that is intended to provide access to a sanitary sewer for maintenance and inspection.
Monitoring, Measurement, and Program Modifications (MMPM) National Pollution Discharge Elimination System (NPDES) Not Applicable (NA)
Notification of an SSO - Refers to the time at which the City becomes aware of an SSO event through observation or notification by the public or other source.
Office of Emergency Services (OES) - Refers to the California Governor’s Office of Emergency Services.
Online SSO Reporting System - Refers to the California Integrated Water Quality System (CIWQS).
Operations and Maintenance (O&M)
Overflow Emergency Response Plan (OERP)
Personal Protective Equipment (PPE)
Preventative Maintenance (PM) - Refers to maintenance activities intended to prevent failures of the sewer system facilities (e.g. cleaning, CCTV, inspection).
Private Lateral Sewage Discharges - Sewage discharges that are caused by blockages or other problems within a privately owned lateral.
Property Damage Overflow - Property damage overflow refers to a sewer overflow or backup that damages private property.
Regional Water Quality Control Board (RWQCB) - Refers to the Regional Water Quality Control Board for Region 5R – Central Valley-Redding.
Sanitary Sewer Overflow (SSO) - Any overflow, spill, release, discharge or diversion of untreated or partially treated wastewater from a sanitary sewer system. SSOs include:
(i) Overflows or releases of untreated or partially treated wastewater that reach waters of the United States;
(ii) Overflows or releases of untreated or partially treated wastewater that do not reach waters of the United States; and
(iii) Wastewater backups into buildings and private property that are caused by blockages or flow conditions within the publicly owned portion of a sanitary sewer system.
Sanitary Sewer System – Refers to the portion of the sanitary sewer facilities that are owned and operated by the City of Oroville.
117
Item 6.
City of Oroville Page 5
Sewer System Management Plan March 30, 2026
Sensitive Area - Refers to areas where an SSO could result in a fish kill or pose an imminent or substantial danger to human health (e.g. parks, aquatic habitats, etc.).
Sewer Service Lateral - Refers to the piping that conveys sewage from the building to the City’s sanitary sewer main.
Sewer System – See sanitary sewer system.
Sewer System Management Plan (SSMP)
Square Feet (sf)
Standard Operating Procedures (SOP) - Refers to written procedures that pertain to specific activities employed in the operation and maintenance of the sanitary sewer system.
State Water Resources Control Board (SWRCB) - Refers to the California Environmental Protection Agency (EPA) State Water Resources Control Board and staff responsible for protecting the State’s water resources.
Surface Waters - See waters of the State.
System Evaluation and Capacity Assurance Plan (SECAP)
Vitrified Clay Pipe (VCP)
Volume Captured - The amount of spilled sewage that is returned to the sanitary sewer system. When recording the volume that is captured, the volume of water used for flushing and/or cleaning should not be included.
Wastewater Collection System – See sewer system.
Water Body - A water body is any stream, creek, river, pond, impoundment, lagoon, wetland, or bay.
Waters of the State - Waters of the State (or waters of the United States) means any water, surface or underground, including saline waters, within the boundaries of California. In case of a sewage spill, storm drains are considered to be waters of the State unless the sewage is completely contained and returned to the sanitary sewer system and that portion of the storm drain is cleaned.
Work Order (WO) - Refers to a document (paper or electronic) that is used to assign work and to record the results of the completed work.
118
Item 6.
City of Oroville Page 6
Sewer System Management Plan March 30, 2026
References
State Water Resources Control Board No. 2022-0103-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems, dated June 5, 2022. 119
Item 6.
City of Oroville Page 2-7
Sewer System Management Plan March 6, 2026
Section 1. Goals and Introduction
1.1. Introduction
This section of the SSMP formally states the City’s goals for its SSMP. The SSMP is a “living document” and will be updated as procedures change and the system is upgraded.
1.2. WDR Requirements
The WDR requirements for the Goals section of the SSMP are:
The collection system agency must develop goals to properly manage, operate, and maintain all parts of its wastewater collection system in order to reduce and prevent SSOs, as well as to mitigate any SSOs that occur.
1.3. SSMP Goals
The City’s goals are:
1. To properly manage, operate, and maintain all parts of the City’s sanitary sewer system.
2. To provide adequate capacity to convey the peak wastewater flows. Adequate capacity, for the purposes of this SSMP, is defined as the capacity to convey the peak wastewater flows that are associated with the design storm event.
3. To reduce the frequency of SSOs and, wherever possible, to prevent SSOs.
4. To mitigate the impacts that are associated with any SSO that may occur.
5. To meet all applicable regulatory notification and reporting requirements. 120
Item 6.
City of Oroville Page 2-8
Sewer System Management Plan March 6, 2026
Section 2. Organization
2.1. Introduction
This section of the SSMP identifies City staff responsible for implementing this SSMP, responding to SSO events, and meeting the SSO reporting requirements.
2.2. WDR Requirements
The requirements for the Organization element of the SSMP are summarized below. The SSMP must identify:
1. The name of the responsible or authorized representative;
2. The names and telephone numbers for management, administrative, and maintenance positions responsible for implementing specific measures in the SSMP program. The lines of authority as shown in an organization chart or similar document with a narrative explanation are to be included; and
3. The chain of communication for reporting SSOs, from receipt of a complaint or other information, including the person responsible for reporting SSOs to the State and Regional Water Board and other agencies if applicable (such as County Health Officer, County Environmental Health Agency, Regional Water Board, and/or State Office of Emergency Services (OES).
2.3. Organization
The organization chart for the management, operation, and maintenance of the City’s sanitary sewer system is shown in Figure 2-1.
2.4. Authorized Representative
The City’s Authorized Representative in all sewer system matters is the City Administrator.
The City Administrator. is authorized to submit verbal, electronic, and written spill reports to the RWQCB, SWRCB, County Health Agency, and OES. The City Administrator is authorized to certify electronic spill reports submitted to the SWRCB.
The Public Works Supervisor is authorized to act in the City Administrator’s absence. The City Administrator is authorized to submit verbal, electronic, and written spill reports to the RWQCB, SWRCB, County Health Agency, and OES. The City Administrator is authorized to certify electronic spill reports submitted to the SWRCB.
2.5. Responsibility for SSMP Implementation
The City Engineer is responsible for developing, implementing, and maintaining all elements of the City’s SSMP (Appendix 2-A).
121
Item 6.
City of Oroville Page 2-9
Sewer System Management Plan March 6, 2026
Figure 2-1: Organization Chart
122
Item 6.
City of Oroville Page 2-10
Sewer System Management Plan March 6, 2026
2.6. SSO Reporting Chain of Communication
The SSO Reporting Chain of Command follows the Organization Chart shown on Figure 2-1.
The SSO Reporting process and responsibilities are described in detail in Section 6 - Overflow Emergency Response Plan.
Appendix 2-A: SSMP Development, Implementation, and
Maintenance Responsibilities
Name Job Title
Phone Number SSMP
Responsibility
Tim Kaber LRO – Director of
Public Works (530) 538-2540 All Sections
Jamie McGuire
Public Works
Operations Manager
(Utility Division)
(530) 538-2490 CIWQS
Rick Seals Collection System
Operator Lead (530) 693-0264 Operations &Maintenance
123
Item 6.
City of Oroville Page 3 -1
Sewer System Management Plan March 6, 2026
Section 3. Legal Authority
3.1. Introduction
This section of the SSMP presents the City’s legal authority to comply with the SSMP requirements, as provided in its Municipal Code and agreements with other agencies.
3.2. WDR Requirements
The summarized requirements for the Legal Authority element of the SSMP are:
The City must demonstrate, through collection system use ordinances, service agreements, or other legally binding procedures, that it possesses the necessary legal authority to:
a) Prevent illicit discharges into its wastewater collection system (examples may include infiltration and inflow (I/I), storm water, chemical dumping, unauthorized debris and cut roots, etc.);
b) Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure. c) Require that sewers and connections be properly designed and constructed; d) Ensure access for maintenance, inspection, or repairs for portions of the lateral owned or maintained by the City;
e) Limit the discharge of fats, oils, and grease and other debris that may cause blockages; f) Enforce any violation of its sewer ordinances;
g) Inspect grease producing dischargers
3.3. Municipal Code
The Oroville Municipal Code describes the City’s current legal authorities for the collection system. The legal authorities provided in the Municipal Code that address the specific requirements for this SSMP are summarized on Table 3-1.
There are two areas where the City’s legal authority does not meet the requirements of the WDR. The City’s intended action regarding those areas are:
• Requirements
124
Item 6.
City of Oroville Page 3 -2
Sewer System Management Plan March 6, 2026
Table 3-1: Legal Authority
Requirement
Municipal Code
Reference
Meets WDR
Requirements?
General
Prevent illicit discharges into the sanitary sewer
system 13.04.210 Yes
Limit the discharge of fats, oils, and grease and
other debris that may cause blockages 13.04.210 Yes
Require that sewers and connections be properly
designed and constructed 13.04.040 Yes
Require proper installation, testing, and inspection
of new and rehabilitated sewers
13.04.040 Yes
Laterals
Clearly define City responsibility 13.12.140 Yes
Ensure access for maintenance, inspection, or
repairs for portions of the service lateral owned or
maintained by the City
NA NA
Control infiltration and inflow (I/I) from private
service laterals 13.04.070 Yes
SEWER PIPE BLOCKAGE Source Control
Requirements to install grease removal devices
(such as traps or interceptors), design standards
for the grease removal devices, maintenance
requirements, BMP requirements, record keeping
and reporting requirements
13.04.080 Partial
Authority to inspect grease producing facilities 13.04.180 Yes Enforcement
Enforce any violation of its sewer ordinances 13.04.110 Yes 125
Item 6.
City of Oroville Page 4-1
Sewer System Management Plan March 30, 2026
Section 4. Operations and Maintenance Program
4.1. Introduction
This section of the SSMP provides an overview of the City’s operations and maintenance program.
4.2. WDR Requirements
The summarized requirements for the Operations and Maintenance (O&M) Program are:
(a) Maintain an up-to-date map of the sanitary sewer system, showing all gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable storm water conveyance facilities;
(b) Describe routine preventive operation and maintenance activities by staff and contractors, including a system for scheduling regular maintenance and cleaning of the sanitary sewer system with more frequent cleaning and maintenance targeted at known problem areas. The preventative maintenance (PM) program should have a system to document scheduled and conducted activities, such as work orders; (c) Develop a rehabilitation and replacement plan to identify and prioritize system deficiencies and implement short-term and long-term rehabilitation actions to address each deficiency. The program should include regular visual and TV inspections of manholes and sewer pipes, and a system for ranking the condition of sewer pipes and scheduling rehabilitation. Rehabilitation and replacement should focus on sewer pipes that are at risk of collapse or prone to more frequent blockages due to pipe defects.
Finally, the rehabilitation and replacement plan should include a capital improvement plan that addresses proper management and protection of the infrastructure assets. The plan shall include a time schedule for implementing the short- and long-term plans plus a schedule for developing the funds needed for the capital improvement plan; (d) Provide training on a regular basis for staff in sanitary sewer system operations and maintenance, and require contractors to be appropriately trained; and (e) Provide equipment and replacement part inventories, including identification of critical replacement parts.
4.3. Collection System Maps
The City maintains its collection system maps using Geographic Information System (GIS).
The maps include all gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable storm water conveyance facilities. The field crews use hard copy maps that are produced from GIS. The hard copy maps are updated on an as-needed basis.
Corrections that are identified by the field crews are forwarded to Engineering Division for action. High-priority corrections are completed as soon as possible. High-priority corrections refer to mapping information that could cause
126
Item 6.
City of Oroville Page 4-2
Sewer System Management Plan March 30, 2026
the field crews to act in a manner that could cause an SSO. Low-priority corrections are completed once a year.
4.4. Operation and Maintenance Program
The elements of the City’s sewer system O&M program include:
• Proactive, preventive, and corrective maintenance of gravity sewers; • Ongoing CCTV inspection program to determine the condition of the gravity sewers; • Rehabilitation and replacement of collection system facilities that are in poor condition; and
• Periodic inspection and preventive maintenance for lift station and force main facilities.
Please see Attachment A for an example of the maintenance logs used by the City. The details of the City’s O&M programs are:
4.4.1. Gravity Sewers
The City proactively cleans all sewers 12-inches in diameter and smaller every two years, and it preventively cleans sewers with a history of problems every 1, 2, or 3 months. The City’s standard operating procedure for sewer cleaning is included as Appendix 4-A.
Gravity sewer cleaning is currently scheduled using paper work orders. The City attempted transitioning to a computer-based maintenance management system to initiate work orders, record completed work and compile a maintenance history for each individual sewer system asset, but the software has since been abandoned. Everything is documented and scheduled using paper work orders.
The City will visually inspect the condition of its entire system greater than 6 inches, every five years and provide cleaning if needed. The City uses CCTV to determine the cause of its gravity sewer blockages and SSOs.
The City completes repairs in priority order using its field crews and underground contractors when required during difficult repairs.
The public works field crews maintain a list of known structural problems for use in providing input to the Public Works Engineering Division on the Capital Improvement Program.
4.4.2. Lift Stations
The City’s lift station O&M program consists of operational inspections, preventive maintenance, and corrective maintenance activities.
The operation of the lift stations is inspected at least once weekly. Critical lift stations such as those with close proximity to the river and high flows are inspected three times per week.
The critical stations include Riverview, Orangewood, Olive Glen, and Butte Woods lift stations. Facility or equipment problems observed during the operational 127
Item 6.
City of Oroville Page 4-3
Sewer System Management Plan March 30, 2026
inspections are noted on logs maintained at the lift stations and on reports for follow-up action. Emergency generators are exercised on the first working day of the month along with any alarm system testing. At this time, Accularm Security Systems is contracted to complete the testing and control the system.
Repairs and major maintenance of lift stations are completed by City staff. Specialty repairs, maintenance, or rehabilitation/replacement are put out to bid.
4.4.3. Force Mains
The City’s force main O&M program consists of periodic inspections, preventive maintenance, and corrective maintenance activities.
The City is a member of Underground Service Alert and marks the location of its force mains to prevent damage by others during underground construction.
The force main right-of-ways are inspected quarterly to identify leakage and potential incursions associated with nearby construction. Formal inspections are difficult due to either accessibility issues or the small diameter of the force mains which does not allow for video inspection.
4.4.4. Non-Routine Maintenance
Non-routine maintenance activities include investigation and response to any complaints regarding a sanitary sewer overflow, missing or shifted manhole covers, manhole covers that are excessively noisy, residential plumbing troubles, lift station malfunction, unexpected sewer odor, etc. Sewer complaints are investigated and appropriate actions are taken to resolve the source of the problem.
4.5. Rehabilitation and Replacement Plan
The City has a Capital Improvement Program that includes the rehabilitation and replacement of its collection system assets where conditions warrant.
The sewer system projects that are included in the City’s Capital Improvement Program are shown in Appendix 4-B.
4.6. Training Program
The City currently uses a combination of on-the-job training, conferences, seminars, and other opportunities to train its collection system staff through Target Solution. A partial list of available training resources is shown on Table 4-1. Please see Attachment B, for the most current California Water Environment Association Collection System Maintenance certificates. The goal is to continue training until each member of the crew has at least a Grade 2 or Grade 3 certificate.
128
Item 6.
City of Oroville Page 4-4
Sewer System Management Plan March 30, 2026
Table 4-1: Training Resources
Sponsor Event Timeframe References
State Conference April
Northern Regional
Safety Conference
May
Northern Regional
Training Conference
September
Northern
Sacramento Valley
Section
Periodic
California Water
Environment
Association
Sacramento Area
Section Collection
Systems Committee
Quarterly
www.cwea.org
Central Valley
Clean Water
Association
Collection System
Committee
Periodic http://www.cvcwa.org
Tri-State
Conference
Annual Conference September www.tristateseminar.com
California State
University,
Sacramento
Videos, manuals,
home study courses
Continuous www.owp.csus.edu
USEPA On-line courses Continuous www.epacampus.com
The City’s contract language requires contractors working in the collection system to provide training for their employees in collection system operations and response to collection system blockages/overflows.
4.7. Equipment and Parts Inventory
The list of the major equipment that the City uses in the operation and maintenance of its sewer system is included in Appendix 4-C.
129
Item 6.
City of Oroville Page 4-5
Sewer System Management Plan March 30, 2026
Appendix 4-A: Standard Operating Procedure for Sewer
Cleaning
Purpose
The purpose of this Standard Operating Procedure is to ensure that sewer cleaning is performed in a manner that will produce a high-quality work product. Quality is important because it ensures that the sanitary sewers will not experience problems prior to their next scheduled cleaning.
Goal
The goal of cleaning a gravity sewer is to restore the flow area to 95% of the original flow area of the pipe.
Required Equipment and Tools
1. Personal protective equipment (hard hat, steel toe boots, gloves, eye/face protection, hearing protection)
2. Calibrated gas detector
3. Proper safety cones, barricades, flagging, signs or other traffic control devices
4. Confined space equipment (tripod, harness, and ventilation blower)
5. Sanitary sewer system map book
6. Combo sewer cleaner
7. Warthog sewer cleaning nozzle
8. Six-wire skid (“proofer”) in sizes that will be encountered during the day
9. Root saw
10. Debris traps in the sizes that will be encountered during the day
11. Manhole hook or pickaxe
12. Measuring wheel
13. Disinfectant
130
Item 6.
City of Oroville Page 4-6
Sewer System Management Plan March 30, 2026
Procedures for Sewer Cleaning Crew
Prior to Leaving the Yard
1. Plan the work so that it starts in the upstream portion of the area and moves downstream.
2. Wherever possible, plan to clean sewers from the downstream manhole.
3. Inspect the sewer cleaning nozzles for wear. Replace nozzles that are excessively worn.
4. If this is the first day that this cleaning unit is being used this week, inspect the first 200 feet of hose and couplings for damage or wear.
At the Jobsite
1. Wear proper personnel protective equipment (PPE).
2. Fill the water tank at or near the first job site.
3. Determine and confirm location of upstream and downstream manholes (use street addresses, if possible).
4. Look for any overhead utilities that may come into contact with the vacuum boom during the cleaning operation.
5. Set up proper traffic control by placing traffic signs, flags, cones and other traffic control devices.
6. Move the cleaning unit into the traffic control so that the hose reel is positioned over the manhole.
7. Open the manhole and use the gas detector to determine if it is safe to proceed with the cleaning operation.
8. Install the Warthog nozzle on the hose.
Cleaning Operation
1. Insert the debris trap.
2. Start the auxiliary engine.
3. Lower the hose, with a guide or roller to protect the hose, into the manhole and direct it into the sewer to be cleaned.
4. Start the high-pressure pump and set the engine speed to provide adequate pressure for the sewer cleaning operation.
5. Open the water valve and allow the hose to proceed up the sewer. The hose speed should not exceed 3 feet per minute.
6. Allow the hose to proceed 25% of the length of the sewer and pull the hose back.
7. Observe the nature and the quantity of debris pulled back to the manhole.
8. If there is little or no debris, allow the hose to proceed to the upstream manhole. 131
Item 6.
City of Oroville Page 4-7
Sewer System Management Plan March 30, 2026
9. If there is moderate to heavy debris, clean the remaining portion of the sewer in steps not to exceed 25% of the length of the sewer.
10. Open the upstream manhole and verify that the nozzle is at or past the manhole.
11. The sewer has been adequately cleaned when successive passes with a cleaning nozzle do not produce any additional debris, and the sewer is able to pass a full size, six-wire skid (“proofer”) for its entire length.
12. Determine the nature and quantity of the debris removed during the cleaning operation.
Use the codes in Table 4-1 to report the nature and quantity of debris. Figure 4-1 is an excerpt from the CWEA “Best Practices Cleaning Results” publication and sets guidelines for coding debris found during field work.
Table 4-2: Criterion for Coding Debris Found During Cleaning Type of Debris
Clear
(no debris) Light Moderate Heavy
Sand, grit, rock CLR DL DM DH
Grease CLR GL GM GH
Roots CLR RL RM RH
Other (specify) CLR OL OM OH
13. Remove the debris from the manhole using the vacuum unit.
14. Rewind the hose on the reel.
15. Remove the debris trap.
16. Clean the mating surface and close the manhole. Ensure that the manhole is properly seated.
17. Enter the results in the Work Order.
18. Move the cleaning unit, break down and stow the traffic controls.
19. Proceed to the next cleaning jobsite.
At the End of the Day
1. Inspect the equipment and tools for problems.
2. Report any problems with equipment, tools, or sewers that were cleaned during the day.
3. Turn in all completed Cleaning Work Orders at end of shift. 132
Item 6.
City of Oroville Page 4-8
Sewer System Management Plan March 30, 2026
Figure 4-1: Excerpt from CWEA publication, “Best Practices Cleaning Results” Standard Measures of Observed Results
Next to cleaning the sewer line, effective observation of results is the most important work product of the crew. This information is the basis for defining future maintenance activities. Consistency is important. The standards for “results” for six- and eight-inch diameter sewers are:
Clear Moderate Heavy
Grit No
observable
grit
Less than 5 gallons
15-20 minutes to clean
1-2 passes required
Requires cleaning twice
or less per year
Only fine grit
More than 5 gallons
More than 30 minutes to clean
More than 4 passes
required
Requires cleaning
four times per year
Grease No
observable
grease
Small chunks/no “logs"
15-20 minutes to clean
1-2 passes required
Requires cleaning twice
or less per year
Big chunks/"logs”
Operator concern for
downstream
plugging
More than 30 minutes to clean
More than 4 passes
required
Liquefied grease Vacuuming not required Vacuuming not
required
Roots No
observable
roots
Thin/stringy roots
present; no large clumps
15-20 minutes to clean
1-2 passes required
Thick roots present
Large “clumps"
More than 30 minutes to clean
More than 4 passes
Other condition
observations:
- Pipe material
fragments
- Soil/dirt
- Rock (pipe
bedding)
- Lost nozzle
133
Item 6.
City of Oroville Page 4-9
Sewer System Management Plan March 30, 2026
Appendix 4–B: Capital Improvement Program
Project
Number Project Title
FY
19/20
FY
20/21
FY
21/22
FY
22/23
FY
23/24
FY
24/25
FY
25/26
1 Oroville Dam Blvd Relief Sewer
2 Stanford Avenue Sewer
3 Grace Baptist Church
4 Montgomery Street Sewer
5 Table Mountain Blvd Sewer
6 Grand Avenue Sewer
7 Downtown Sewer
8 5
th Avenue Sewer
9 Feather River Blvd Sewer
10 Oroville Industrial Park Sewer
11 Olive Highway Expansion
12 Oroville Quincy Highway
Expansion
13 Dry Creek Pump Station and
Pipeline Expansion
14 Zepher Way Expansion
15 Orange Avenue Sewer
16 Larkin Rd Bypass Sewer
17 West Oroville Dam Blvd
Expansion
18 TWSD East Interceptor
19 Ruddy Creek Pump Station
Upgrade 1
Additional CIP projects will be added
as televising, condition assessment
and flow monitoring (I&I investigation)
of the collection system progresses
134
Item 6.
City of Oroville Page 4-10
Sewer System Management Plan March 30, 2026
Appendix 4–C: Major Sewer System Equipment Inventory
Equipment
Number Major Equipment Type Year Purchased
55 Mercedes CCTV Van 2008
163 Bobcat Mini Excavator 2016
50, 51, NA Ford F-150 Service Truck - 3 2015, 2012, 2024 59, 67 Ford F-350 Service Truck -2 2012, 2024
164 Kenworth 5 CY Dump Truck 2017
53 Kenworth VacCon 2012
54 Sterling Vactor 2002
166 Kenworth Vactor 2022
167 Ford F-550 CCTV Van 2023
NA Doosan G125 Generator 2020
78 Ingersoll Rand Generator 2001
NA Pipe Hunter Easement Cart 2011
58 Ford F-350 1 Ton 2020
135
Item 6.
City of Oroville Page 5-1
Sewer System Management Plan March 30, 2026
Section 5. Design and Performance Provisions
5.1. Introduction
Design standards are incorporated into the City’s standard details by the City’s Public Works Department for the design of new and rehabilitated collection system facilities.
The City’s standard details can be found at http://www.cityoforoville.org/services/publicworks-department/engineering-division/improvement-standards.
5.2. WDR Requirements
The summarized requirements for the Design and Performance Provisions element of the SSMP are:
The Agency must have design and construction standards and specifications for the installation of new sewer systems and for the rehabilitation and repair of existing sewer systems.
The Agency must also have procedures and standards for inspecting and testing the installation of new sewers, pump stations, and other appurtenances; and for rehabilitation and repair projects.
5.3. Design Criteria
The City’s Sanitary Sewer System Design Criteria are:
5.3.1. General
1. Any situation that varies from the standard conditions will require additional or specialized design features to ensure reliability, access for maintenance, and economical operation and maintenance. Design conditions that differ from these standards require approval from the City Engineer.
2. Sewer lift stations require telemetry equipment to be incorporated into the design of the facility. The Public Works Department will provide specific design requirements when improvement plans are submitted for plan check.
5.3.2. Mains
1. Minimum size shall be eight inches.
2. The maximum depth of flow during peak dry weather flow shall not exceed 3/4 of the diameter for new pipes.
3. No vertical or horizontal curves shall be permitted, unless otherwise approved by the Public Works Department.
4. The deflection between any two successive joints will not exceed 80% of the maximum deflection recommended in writing by the pipe manufacturer. The minimum pipe length used to construct short radius curves will be two feet. 136
Item 6.
City of Oroville Page 5-2
Sewer System Management Plan March 30, 2026
5. Sewer main locations shall be located in the center of the street or easement. A minimum ten-foot horizontal separation outside-of-pipe to outside-of-pipe from waterlines shall be maintained.
6. Minimum cover for sewer pipe shall be 36 inches below the finished grade, unless otherwise approved by the Public Works Department.
7. Minimum Grade: A minimum velocity shall be two feet per second (fps) at peak daily dry weather flow. The minimum grade shall be:
Pipe Diameter Minimum Grade
8” 0.35%
10” and larger 0.25%
8. Wastewater Flow Projection Criteria shall be:
Category Unit Flowrate - GPD(1)
Auditorium/Assembly Hall Seat 5
Bowling Alley Per Lane 200
Carwash - Coin Operated Stall 200
Commercial 1,000 GSF 100
Department Store Toilet Room 550
Department Store Employee 10
Hospital Bed Bed 250
Hospital Employee Employee 10
Hotels & Motels Room 150
Laundry - Self Service Machine 500
Medical Building 1,000 GSF(2) 300
Office Building 1,000 GSF 200
Prison Employee Employee 10
Prison Inmate Inmate 120
Residential - 1 Bedroom Apartment Dwelling Unit 150
Residential - 2 Bedroom Apartment Dwelling Unit 200
Residential - Mobile Home Dwelling Unit 200
Residential - Single Family Dwelling Dwelling Unit 260
Rest Home Bed 100
Restaurant Fixed Seat 50
School w/cafeteria only Student 15
School w/cafeteria, gym & showers Student 25
School w/o cafeteria, gym & showers Student 10
Shopping Center Parking Space 2
Shopping Center Employee 10
137
Item 6.
City of Oroville Page 5-3
Sewer System Management Plan March 30, 2026
Category Unit Flowrate - GPD(1)
(1) Flowrate = Average dry weather flow gallons per day (2) GSF = Gross square feet
9. Peak daily flows for new residential developments shall be based on a ratio of peak to average flow of 2.5.
10. All sewer mains not located within the public right-of-way shall be provided with a minimum 15-foot wide sewer easement. In some special cases a wider easement may be required; easement width shall be determined by the City Engineer. All easements shall be easily accessible to City’s maintenance equipment.
11. Where water and sewer mains are located within the same easement, the minimum easement width shall be 20 feet. All easements shall be easily accessible to the City for maintenance.
12. The standards for rehabilitation shall be:
a. All sewer main replacements in easements should be constructed using trenchless construction methods where feasible and/or acceptable. The materials shall be SDR-35 PVC. Creek, railroad, and freeway crossings shall be SDR-35 HDPE or C900 PVC and the sewer main shall be installed in a steel casing with appropriate corrosion protection. b. All sewer main replacements in streets and other paved areas shall be constructed using open cut or trenchless construction methods. Mains with less than 3.5 feet of cover shall be constructed using open trench construction methods. The materials shall be SDR-35. Protection from surface loads shall be approved by the Public Works Department. c. All sags deeper than 1.5 inches shall be eliminated using spot repairs prior to proceeding with the rehabilitation method.
d. All connecting manholes, lamp holes, and clean outs shall be replaced or rehabilitated at the time the sewer main is rehabilitated or replaced. e. All laterals shall be reconnected to the main at a 45-degree angle.
5.3.3. Manholes
1. Minimum drop through manholes shall be 0.10 feet.
2. Manholes shall be required:
a. At all changes of slope.
b. At all changes in size or material.
c. At all changes of direction.
d. At all intersections of with other mains.
e. At all ends of lines and beginning of all mains.
138
Item 6.
City of Oroville Page 5-4
Sewer System Management Plan March 30, 2026
3. All manholes shall be numbered on the plans.
4. Manhole spacing shall be 300 feet maximum or as approved by the Public Works Department.
5. For all industrial users, an inspection manhole shall be provided immediately behind the property line.
6. For all residential uses, a cleanout shall be provided within two feet of the property line.
7. Match soffit elevation at all locations where sewers of different size are connected in a manhole.
5.3.4. Laterals
1. Each parcel or lot shall have only one connection to public sewer main.
2. Minimum size shall be four inches. Six-inch laterals shall be provided for properties with five or more connected units and all commercial connections.
3. Sewer laterals six inches and larger, shall be connected to an existing manhole or a new manhole shall be constructed.
4. Minimum slope shall be 1/4 inch per foot.
5. An inspection manhole shall be provided at the property line for industrial projects where the flow will exceed 5,000 gallons per day.
6. All laterals are to be shown on improvement plans by stationing or a lateral table. On “As-Built” plans all laterals shall be shown in plan view to scale and dimensioned from the nearest sewer manhole.
7. Location:
a. Perpendicular to the sewer main.
b. Standard is from the center of lot to five feet above downstream lot line (shown on “As-Built” plans).
c. Services shall not be located in the driveway.
8. An “S” shall be stamped on the curb face at the lateral location.
9. Separation between sewer and water laterals shall be per City Standard Details and State regulations.
10. Minimum cover shall be three (3) feet minimum at the property line.
11. Any lot with a finished pad elevation lower than the top of the finished street grade where the sewer main is located that serves this lot, must install a sewer back flow prevention valve on private property. The valve must be installed in a valve box for easy access and be visible from the public right-of–way. The property owner shall be responsible for the installation and maintenance of the sewer backflow prevention valve. The backflow
139
Item 6.
City of Oroville Page 5-5
Sewer System Management Plan March 30, 2026
prevention valve shall be shown on the precise grading and improvement plans. a. The backflow certification shall be completed by the developer in accordance with City standards.
b. The property owner is responsible for maintaining the backflow prevention valve in proper operating condition at all times.
5.3.5. Lift Station
Lift stations shall not be employed unless deemed essential by the Public Works Department. Design criteria to be provided by the Public Works Department.
5.3.6. City Sanitary Sewer System – Authorized Materials The authorized materials for the City’s sewer system are shown on Table 5-1.
Table 5-1: Acceptable Pipe Materials for New Gravity Sewers Material Designation Standard
Polyvinylchloride Pipe
(PVC)
SDR-35
C900
ASTM D3033 or D3034
AWWA C900
5.3.7. Private Sewer Systems
1. All private sewer systems serving more than one building shall be governed by and permitted through the Building Department. A manhole shall be set at the property line and at the mainline, if required.
2. The sewer system upstream of the manhole at the property line shall be considered private.
3. In the event that a private sewer system is proposed to be converted to a public system, the entire system must be upgraded to meet the public standards as presented in this section.
4. Acceptable pipe materials for buried main and trunk sewers 24 inches in diameter and smaller are shown in Table 5-1. Materials for other applications require the approval of the Public Works Department.
5.3.8. Inspection and Testing Criteria
The City’s Sanitary Sewer System Inspection and Testing Criteria are based on the City’s Engineering Standards. The City’s inspection and testing criteria are:
New Gravity Sewers
Inspection during construction – All new gravity sewers will be periodically inspected during construction to ensure that the sewer is constructed using the specified materials and methods. Specific approvals will be required by the 140
Item 6.
City of Oroville Page 5-6
Sewer System Management Plan March 30, 2026
inspector prior to backfilling the trench, prior to paving, and prior to acceptance by the City. The contractor will be required to provide survey controls so that the inspector can verify line and grade (slope). Unusual conditions and special features will be recorded for future reference.
Leakage – All new gravity sewers will be tested to verify that they have been properly constructed. Sewers will be tested using a low air pressure test in accordance with City standards. Gravity sewers that fail the test shall be repaired and retested.
Deflection – All flexible pipe will be tested for deflection following backfill and prior to paving in accordance with City standards. Gravity sewers that fail the test shall be repaired and retested. “Re-rounding” is not allowed.
CCTV inspection – All new gravity sewers will be inspected using a closed circuit television to verify that the pipe is free from defects/damage, that the joints have been correctly construct, and that the sewer is free from sags that will cause future operational problems. Gravity sewers shall be cleaned prior to inspection and shall be flushed with water so that sags can be identified and recorded.
Warranty inspection – All new gravity sewers will be inspected using CCTV prior to the end of the warranty period to ensure that there are no latent defects. Repairs shall be completed in a timely manner at the Contractor’s expense.
New Manholes
Inspection during construction - All new manholes will be periodically inspected during construction to ensure that the sewer is constructed using the specified materials and methods. Unusual conditions and special features will be recorded for future reference.
Leakage – All new manholes will be vacuum tested to verify that the joints, connections, and frame/cover are tight. The vacuum test will follow ASTM C1244. The test will be conducted at a 10 inch Hg vacuum. The vacuum loss shall be less than one inch Hg for the time shown on Table 5-2.
Table 5-2: Minimum Manhole Vacuum Test Time in Seconds
Depth / Diameter 4-foot diameter 5-foot diameter 6-foot diameter Depth = 15 feet or less 60 75 90
Manholes that fail the vacuum test shall be repaired using materials and methods approved by the Public Works Department and retested.
New and Rehabilitated Lift Stations
Inspection during construction – All new and rehabilitated lift stations will be periodically inspected during construction to ensure that they are constructed using the specified materials and methods. Unusual conditions and special features will be recorded for future reference.
141
Item 6.
City of Oroville Page 5-7
Sewer System Management Plan March 30, 2026
Functional test – All systems in new and rehabilitated lift stations will be tested to ensure they function as intended.
Performance test – All new and rehabilitated lift stations will be required to pass an extended performance test to ensure that they are capable of reliably meeting the design performance for a period of at least 120 hours of continuous operation without failure or alarms. The results of these performance tests will be recorded for use as a basis for evaluating future performance evaluations.
142
Item 6.
City of Oroville Page 6-1
Sewer System Management Plan March 30, 2026
Section 6. Spill Emergency Response Plan
6.1. Introduction
The purpose of this Overflow Emergency Response Plan (OERP) is to support an orderly and effective response to SSOs.
6.2. WDR Requirements
The collection system agency shall develop and implement an overflow emergency response plan that identifies measures to protect public health and the environment. At a minimum, this plan must include the following:
(a) Proper notification procedures so that the primary responders and regulatory agencies are informed of all SSOs in a timely manner;
(b) A program to ensure appropriate response to all overflows; (c) Procedures to ensure prompt notification of appropriate regulatory agencies and other potentially affected entities (e.g. health agencies, regional water boards, water suppliers, etc.) of all SSOs that potentially affect public health or reach the waters of the State in accordance with the Monitoring and Reporting Program (MRP). All SSOs shall be reported in accordance with this MRP, the California Water Code, other State Law, and other applicable Regional Water Board Waste Discharge Requirements or National Pollutant Discharge Elimination System (NPDES) permit requirements. The Sewer System Management Plan should identify the officials who will receive immediate notification;
(d) Procedures to ensure that appropriate staff and contractor personnel are aware of and follow the Emergency Response Plan and are appropriately trained;
(e) Procedures to address emergency operations, such as traffic and crowd control and other necessary response activities; and
(f) A program to ensure that all reasonable steps are taken to contain untreated wastewater and prevent discharge of untreated wastewater to waters of the United States and minimize or correct any adverse impact on the environment resulting from the SSOs, including such accelerated or additional monitoring as may be necessary to determine the nature and impact of the discharge (g) Remove sewage from the drainage conveyance system;
(h) Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; (i) Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
143
Item 6.
City of Oroville Page 6-2
Sewer System Management Plan March 30, 2026
(j) Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; (k) Conduct post-spill assessments of spill response activities; (l) Document and report spill events as required in this General Order; and (m) Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.
144
Item 6.
City of Oroville Page 6-3
Sewer System Management Plan March 30, 2026
6.3. Goals
The City’s goals with respect to responding to SSOs are:
• Respond quickly to minimize the volume of the SSO;
• Eliminate the cause of the SSO;
• Contain the spilled wastewater to the extent feasible; • Minimize public contact with the spilled wastewater;
• Mitigate the impact of the SSO;
• Meet the regulatory reporting requirements; and
• Notify the public when a threat to public health exists.
6.4. SSO Detection
The processes that are employed to notify the City of the occurrence of an SSO include: observation by the public, receipt of an alarm, or observation by City staff during the normal course of their work.
6.4.1. Public Observation
Public observation is the most common way that the City is notified of blockages and spills. Contact information for reporting sewer spills and backups are on the City’s website:
http://www.cityoforoville.org/services/public-works-department/engineeringdivision/sanitary-sewers and the Public Works Department is in the process of installing signs near lift stations with emergency contact information. The working hours telephone number for reporting sewer problems is (530) 538-2420. The after-hours telephone number is (530) 538- 2448 (Police Dispatch).
6.4.1.1. Normal Work Hours
The City’s regular working hours for the sewer crew is Monday through Friday from 7:00 a.m. to 3:30 p.m. except holidays. When a report of a sewer spill or backup is made, City Staff receives the call, takes the information from the caller, fills out the first section of the Sewer Report Form (See Attachment D) and communicates it to the field crew who responds to the site.
6.4.1.2. After Hours
The Police Dispatcher receives the call, takes the information from the caller, and communicates it to the Public Works Standby Person. The Police Dispatcher also notifies Public Works if an alarm is set off after hours. See Appendix 6-A for additional after-hours personnel contact information.
145
Item 6.
City of Oroville Page 6-4
Sewer System Management Plan March 30, 2026
6.4.2. Receipt of Alarm
If an alarm is set off during normal working hours, Accularm will contact the City Staff; however, after hours they will contact the Police Dispatcher as well as the Public Works Supervisor if available.
6.4.3. City Staff Observation
City Staff conduct periodic inspections of the sewer system facilities as part of their routine activities. Any problems noted with the sewer system facilities are reported to appropriate City personnel who, in turn, respond to emergency situations.
6.5. SSO Response Procedures
Sewer service calls and lift station alarms are considered high priority events that demand a prompt response. The notification and response procedure flow chart is shown on Figure 6-1. Emergency contact information is included in Appendix 6-A.
6.5.1. First Responder’s Role
• To protect public health, environment and property from sewage spill events and restore area back to normal as soon as possible.
• To establish perimeters and control zones with traffic cones, barricades, vehicles or terrain.
• To promptly identify major SSO events and/or the need for additional resources (e.g. people, equipment, etc.).
• To contain and control the sewage discharged to the maximum extent possible.
Every effort must be made to prevent the discharge of sewage into waterways above and below ground.
6.5.2. First Responder Priorities
The first responder’s priorities are to:
• Follow safe work practices.
• Respond promptly with the appropriate equipment.
• Contain the spill whenever feasible.
• Restore the flow as soon as practicable.
• Minimize public access to and/or contact with the spilled sewage. • Promptly notify Public Works Operations Manager in event of major SSO. • Return the spilled sewage to the sewer system.
• Restore the area to its original condition (or as close as possible). 146
Item 6.
City of Oroville Page 6-5
Sewer System Management Plan March 30, 2026
6.5.3. Safety
The first responder is responsible for following safety procedures at all times. Special safety precautions must be observed when performing sewer system work.
There may be times when City personnel responding to a sewer system event are not familiar with potential safety hazards peculiar to sewer system work. In such cases it is appropriate to take the time to discuss safety issues, consider the order of work, and check safety equipment before starting the job.
6.5.4. Initial Response
All sewer system calls require a response to the reported location of the event in an attempt to minimize or eliminate an overflow. The first responder must respond to the reporting party, lift station, or site of the problem immediately and visually check for potential sewer stoppages or overflows.
147
Item 6.
City of Oroville Page 6-6
Sewer System Management Plan March 30, 2026
Figure 6-1: SSO Response Procedure Flow Chart
148
Item 6.
City of Oroville Page 6-7
Sewer System Management Plan March 30, 2026
The first responder should:
• Get a brief description of the nature of the problem from the caller. Determine appropriate response measures based on the circumstances and information provided by the caller (e.g. weather and traffic conditions, small back up vs. sewage flowing on the ground, etc.).
• If the situation requires, call the Public Works Operations Manager (working hours) or the Police Dispatcher (after hours) to call other Public Works employees to assist in the SSO response. See Appendix 6-A for After Hours and Emergency Contact Information.
• Note arrival time, document conditions with photographs, contact caller if time permits.
• Verify the existence of a sewer system spill or backup. • Regardless of whether the spill/backup is caused by a private lateral or other agency sewer system, the responding crew should always contain/mitigate the spilled sewage to the extent feasible and standby until representatives of the responsible party arrive and are fully operational.
6.5.5. Restore Flow
Relieve the stoppage or restore the lift station operation as soon as possible by use of the appropriate equipment.
If addressing a stoppage, set up downstream of the blockage and hydro clean or rod upstream from a clear manhole. Attempt to remove the blockage from the system and observe the flows to ensure that the blockage does not recur downstream.
If the blockage cannot be cleared within a reasonable time (15 minutes), or the sewer requires construction repairs to restore flow, or if the lift station operation cannot be restored within the wet well holding time, then initiate containment and/or bypass pumping. If assistance is required, contact the Public Works Operations Manager (working hours) or the Police Dispatch (after hours) or call other employees directly.
6.5.6. Initiate Spill Containment Measures
The first responder should attempt to contain as much of the spilled sewage as possible using the following steps:
• When a spill, leak, and/or overflow occurs, keep sewage from entering the storm drain system to the maximum extent practicable by covering or blocking storm drain inlets and catch basins, or by containing and diverting the sewage away from open channels and other storm drain facilities (using sandbags, inflatable dams, plastic mats, etc.).
• Determine the immediate destination of the overflowing sewage. • Review sewer maps for possible temporary upstream flow diversion bypassing. 149
Item 6.
City of Oroville Page 6-8
Sewer System Management Plan March 30, 2026
• Pump around the blockage/pipe failure/lift station.
• Dike/dam (or sandbag) the spill by building a temporary berm to collect the spilled sewage.
• If overflowing sewage has made contact with the storm drainage system, attempt to contain the spilled sewage by plugging downstream storm drainage facilities. • Modify these methods as needed to accommodate wet weather conditions where the feasibility of containment may be impacted by the quantity of stormwater runoff.
6.6. Recovery and Clean Up
The recovery and clean up phase begins when the flow has been restored and the spilled sewage has been contained to the extent possible. The SSO recovery and clean up procedures are:
6.6.1. Water Quality Sampling and Testing
Water quality sampling and testing is required whenever more than 1,000 gallons of spilled sewage enters a surface water to determine the extent and impact of the SSO.
The water quality sampling procedures are:
• The first responder should collect samples. Samples should be collected as soon as possible after the discovery of the SSO event.
• For discharges into flowing water (e.g. rivers, creeks), the water quality samples should be collected from 100 feet upstream of the spill, from the spill area, and for 1,000 feet downstream of the spill at 100-foot intervals. • For discharges into stationary water (e.g. lakes, ponds), the water quality samples should be collected from the spill area, and for 1,000 feet on either side of the spill at 100-foot intervals.
• A laboratory will analyze the results to determine the nature and impact of the discharge. Additional samples will be taken to determine when posting of warning signs can be discontinued. The basic analyses should include total coliform, fecal coliform, biochemical oxygen demand (BOD), dissolved oxygen, and ammonia nitrogen.
6.6.2. Public Notification
The public that may be at risk should be warned to avoid contact with sewage or sewage-contaminated water from an SSO. The notification methods are described in the subsections below.
Local agencies and individuals may need to be contacted as soon as possible, depending on the situation, including:
• Police Department to control traffic;
150
Item 6.
City of Oroville Page 6-9
Sewer System Management Plan March 30, 2026
• Public Works to close the areas (i.e. parks) and to mitigate impact on surface waters; and
• Local residents who may be impacted by the sewage spill.
6.6.2.1. Sign Posting and Barricading
Post warning signs and block the contaminated areas with “Yellow Caution Tape” and barricades to keep vehicles and pedestrians away from contact with spilled sewage. Do not remove these until results of the lab tests show that the area is safe for human contact. A sample warning sign is included as Appendix 6-H.
Property, creeks, rivers, or beaches that have been contaminated as a result of an SSO should be posted at visible access locations until the risk of contamination has subsided to background levels. The warning signs, once posted, should be checked every day to ensure that they are still in place.
6.6.2.2. Notification of Media
Major spills may warrant broader public notice. The Director of Public Works will contact local media when significant areas may have been contaminated by sewage.
The Director of Public Works will maintain contact information for local media.
6.6.3. Estimate the Volume of Spilled Sewage
Use the methods outlined in Appendices 6-F and 6-G to estimate the volume of the spilled sewage. Wherever possible, document the estimate using photos of the SSO site before and during the recovery operation.
6.6.4. Recovery of Spilled Sewage
Vacuum up or pump the spilled sewage and discharge it back into the sanitary sewer system.
6.6.5. Clean up and Disinfection
When disinfecting a sewage-contaminated area, take every effort to ensure that the disinfectant or sewage treated with the disinfectant is not discharged to the storm drain system or surface waters. Methods may include blocking storm drain inlets, containing and diverting disinfectant and sewage away from open channels and other storm drain fixtures, and removing the material with vacuum equipment.
Clean up and disinfection procedures should be implemented to reduce the potential for human health issues and adverse environmental impacts that are associated with an SSO event. The procedures described are for dry weather conditions and should be modified as required for wet weather conditions. Where cleanup is beyond the capabilities of City staff, a cleanup contractor will be used. 151
Item 6.
City of Oroville Page 6-10
Sewer System Management Plan March 30, 2026
6.6.5.1. Hard Surface Areas
• Collect all signs of sewage solids and sewage-related material either by hand or with the use of rakes, brooms and shovels.
• Wash down the affected area with clean water until the water runs clear. Take reasonable steps to contain and vacuum up the wastewater. • Disinfect all areas that were contaminated from the overflow using the disinfectant solution of household bleach diluted 10:1 with water. Apply minimal amounts of the disinfectant solution using a hand sprayer. Document the volume and application method of disinfectant that was employed.
• Allow the area to dry. Repeat the process if additional cleaning is required. • Do not apply disinfectant solution during wet weather conditions.
6.6.5.2. Landscaped and Unimproved Natural Vegetation
• Collect all signs of sewage solids and sewage-related material either by hand or with the use of rakes, brooms, and shovels.
• Wash down the affected area with clean water until the water runs clear. The flushing volume should be approximately three times the estimated volume of the spill.
• Either contain or vacuum up the wash water so that none is released. • Allow the area to dry. Repeat the process if additional cleaning is required. • Do not apply disinfectant solution to landscaped areas or unimproved natural vegetation.
6.6.5.3. Natural Waterways
The California Department of Fish and Wildlife should be notified in the event a SSO impacts any natural waterways. Fish and Wildlife will provide the professional guidance needed to effectively clean up spills that occur in these sensitive environments.
Clean up should proceed quickly in order to minimize negative impact. Any water that is used in the cleanup process should be de-chlorinated prior to use.
6.6.5.4. Wet Weather Modifications
Omit flushing during heavy storm events with heavy runoff where flushing is not required.
6.6.6. Follow-Up Activities
If sewage has reached the storm drain system, the Sewer Cleaning Truck should be used to vacuum/pump out the catch basin, and any other portion of the storm drain that may contain sewage.
In the event that an overflow occurs at night, the location should be re-inspected as soon as possible the following day. The operator should look for any signs of 152
Item 6.
City of Oroville Page 6-11
Sewer System Management Plan March 30, 2026
sewage solids and sewage-related material that may warrant additional cleanup activities.
6.7. Failure Analysis Investigation
The objective of a failure analysis investigation is to determine the “root cause” of the SSO and to identify corrective action(s) needed that will reduce or eliminate future potential for the SSO to recur.
The investigation should include reviewing all relevant data to determine appropriate corrective action(s). The investigation should include:
• Reviewing and completing the Sewer Report Form;
• Reviewing past maintenance records;
• Reviewing available photographs;
• Conducting a CCTV inspection to determine the condition of the line segment immediately following the SSO and reviewing the video and logs; and • Interviewing staff who responded to the spill.
The product of the failure analysis investigation should be the determination of the root cause and the identification of the corrective actions. The Collection System SSO Analysis Form (Appendix 6-D) should be used to document the investigation.
6.8. SSO Categories
The SWRCB has established guidelines for classifying and reporting SSOs. Reporting and documentation requirements vary based on the type of SSO. There are three categories of SSOs as defined by the SWRCB:
• Category 1 - All discharges of any volume of sewage that:
A. Result in a discharge to a drainage channel and/or surface water; or B. Discharge to a storm drain pipe that was NOT fully captured and returned to the sanitary sewer system.
• Category 2 – Discharges of untreated or partially treated sewage equal to or greater than 1,000 gallons that discharge to a Surface Water. • Category 3 – Discharge Volume is between 50 gallons and 999 gallons. • Category 4 – Discharge Volume is less than 50 gallons.
6.9. SSO Documentation and Reporting
All SSOs should be thoroughly investigated and documented for use in managing the sewer system and meeting established reporting requirements. The procedures for investigating and documenting SSOs are:
153
Item 6.
City of Oroville Page 6-12
Sewer System Management Plan March 30, 2026
6.9.1. Internal SSO Reporting Procedures
6.9.1.1. Category 1 SSOs
The first responder will immediately notify the Public Works Operations Manager (working hours) or Police Dispatch (after hours) who will notify the Public Works Operations Manager.
The Public Works Operations Manager or his/her designee will meet with field crew(s) at the site of the SSO event to assess the situation and to document the conditions with photos.
The first responder will fill out the Sewer Report Form and turn it in to the Public Works Operations Manager. The Public Works Operations Manager will review the form for completeness and accuracy and will forward it in to the Legally Responsible Official (LRO).
In the event of a large overflow or an overflow in a sensitive area, Public Works Operations Manager will notify the Director of Public Works. The Director of Public Works may notify the City Administrator and City Council.
6.9.1.2. Category 2 SSOs
The first responder will fill out the Sewer Report Form and turn it in to the Public Works Operations Manager. The Public Works Operations Manager will review the form for completeness and accuracy and will forward it in to the LRO.
6.9.1.3. Category 3 SSOs
The first responder will fill out the Sewer Report Form and turn it in to the Public Works Operations Manager. The Public Works Operations Manager will review the form for completeness and accuracy and will forward it in to the LRO.
6.9.1.4. Category 4 SSOs
The first responder will fill out the Sewer Report Form and turn it in to the Public Works Operations Manager. The Public Works Operations Manager will review the form for completeness and accuracy and will forward it in to the LRO.
6.9.2. External SSO Reporting Procedures
The California Integrated Water Quality System (CIWQS) electronic reporting system will be used for reporting SSO information to the SWRCB whenever possible. A flow chart is included as Figure 6-2 showing the external reporting response requirements based on the type of SSO. An external reporting response checklist with contact information is included as Figure 6-3.
6.9.2.1. Category 1 SSOs that reach Waters of the State If a Category 1 SSO results in a discharge to waters of the State (a drainage channel or surface water, if not fully recovered), the following reporting requirements apply:
154
Item 6.
City of Oroville Page 6-13
Sewer System Management Plan March 30, 2026
• Within two hours of being notified of the spill event, the Public Works Operations Manager or his/her designee will:
o Notify OES (and obtain spill number for use in other reports), o Notify the Butte County Department of Health (County Health), and o Notify the RWQCB.
• Within 24 hours of being notified of the spill event, the Public Works Operations Manager or his/her designee will certify to the RWQCB that OES and County Health were notified of the SSO event.
• Within 3 business days of being notified of the spill event, the LRO or his/her designee will certify the initial report using CIWQS.
• Within 15 calendar days of the conclusion of SSO response and remediation, the LRO or his/her designee will certify the final report using CIWQS. • The LRO or his/her designee will update the certified report as new or changed information becomes available. The updates can be submitted at any time and must be certified.
6.9.2.2. Category 2 SSOs
• Within 3 business days of being notified of the spill event, the LRO or his/her designee will certify the initial report using CIWQS.
• Within 15 calendar days of the conclusion of SSO response and remediation, the LRO or his/her designee will certify the final report using CIWQS. • Within 30 calendar days after the end of the calendar month in which the SSO occurs, the Public Works Operations Manager or his/her designee will submit an electronic report using CIWQS and the LRO will certify the report. The report will include the information to meet the WDR requirements.
6.9.2.3. Category 3 SSOs
• Within 30 calendar days after the end of the calendar month in which the SSO occurs, the Public Works Operations Manager or his/her designee will submit an electronic report using CIWQS and the LRO will certify the report. The report will include the information to meet the WDR requirements.
6.9.2.4. Category 4 SSOs
• Within 30 calendar days after the end of the calendar month in which the SSO occurs, the Public Works Operations Manager or his/her designee will submit an electronic report using CIWQS and the LRO will certify the report. The report will include the information to meet the WDR requirements.
6.9.2.5. Private Lateral Sewage Discharges
The Public Works Operations Manager or his/her designee may report private lateral SSOs using CIWQS, specifying that the sewage discharge occurred and 155
Item 6.
City of Oroville Page 6-14
Sewer System Management Plan March 30, 2026
was caused by a private lateral and identifying the responsible party (other than the City), if known.
6.9.2.6. No Spill Certification (Monthly)
If there are no SSOs during the calendar month, the Public Works Operations Manager or his/her designee will submit an electronic report, and the LRO will certify the report that the City did not have any SSOs within 30 calendar days after the end of each calendar month.
6.9.2.7. CIWQS Not Available
In the event that CIWQS is not available, the Public Works Operations Manager or his/her designee will fax all required information to the RWQCB office in accordance with the time schedules identified above. In such event, the City will submit the appropriate reports using CIWQS as soon as practical. The RWQCB fax number for Region 5R is (530) 224-4857. A sample form with required information is included as Appendix 6-C.
6.9.3. Internal SSO Documentation
6.9.3.1. Category 1,2,3 and 4 SSOs
The first responder will complete a work order and the Sewer Report Form (Appendix 6-B) and provide copies to the Public Works Operations Manager.
The Public Works Operations Manager will prepare a file for each individual SSO. The file should include the following information:
• Initial service call information
• Sewer Report Form
• Copies of the CIWQS report forms
• Volume estimate
• Failure analysis investigation results
The following are optional for Category 2 SSOs:
• Appropriate maps showing the spill location
• Photographs of spill location
• Water quality sampling and test results, if applicable 156
Item 6.
City of Oroville Page 6-15
Sewer System Management Plan March 30, 2026
Figure 6-2: SSO External Reporting Requirement Flow Charts 157
Item 6.
City of Oroville Page 6-16
Sewer System Management Plan March 30, 2026
158
Item 6.
City of Oroville Page 6-17
Sewer System Management Plan March 30, 2026
159
Item 6.
City of Oroville Page 6-18
Sewer System Management Plan March 30, 2026
160
Item 6.
City of Oroville Page 6-19
Sewer System Management Plan March 30, 2026
161
Item 6.
City of Oroville Page 6-20
Sewer System Management Plan March 30, 2026
6.9.4. External SSO Record Keeping Requirements
The WDR requires that individual SSO records be maintained by the City for a minimum of five years from the date of the SSO. This period may be extended when requested by the RWQCB Executive Officer. All records shall be made available for review upon SWRCB or RWQCB staff's request. Records shall be retained for all SSOs, including but not limited to the following when applicable:
• Copy of Certified CIWQS report;
• All original recordings for continuous monitoring instrumentation; • Service call records and complaint logs of calls received by the City; • SSO records;
• Steps that have been and will be taken to prevent the SSO from recurring and a schedule to implement those steps;
• Work orders, work completed, and any other maintenance records from the previous five years which are associated with responses and investigations of system problems related to SSOs;
• A list and description of complaints from customers or others from the previous five years; and
• Documentation of performance and implementation measures for the previous five years.
If water quality monitoring is conducted by the City or its agent(s), as a result of any SSO, records of monitoring information shall include:
• The date, exact place, and time of sampling or measurements; • The individual(s) who performed the sampling or measurements; • The date(s) analyses were performed;
• The individual(s) who performed the analyses;
• The analytical technique or method used; and
• The results of such analyses.
6.10. Post-SSO Event Debriefing
Every SSO event is an opportunity to evaluate the response and reporting procedures.
Each overflow event is unique, with its own elements and challenges including volume, cause, location, terrain, and other parameters.
As soon as possible after major SSO events, all of the participants, from the person who received the call to the last person to leave the site, should meet to review the procedures used and to discuss what worked and where improvements could be made in responding to and mitigating future SSO events. The results of the debriefing should be recorded and tracked to ensure the action items are completed. 162
Item 6.
City of Oroville Page 6-21
Sewer System Management Plan March 30, 2026
6.11. Equipment
This section provides a list of specialized equipment that is required to support this Overflow Emergency Response Plan.
Closed Circuit Television (CCTV) Inspection Unit – A CCTV Inspection Unit is required to determine the root cause for all SSOs from gravity sewers.
Camera – A digital or disposable camera is required to record the conditions upon arrival, during clean up, and upon departure.
Emergency Response Truck – A utility body pickup truck is required to store and transport the equipment needed to effectively respond to sewer emergencies. The equipment and tools should include containment and clean up materials.
GPS Unit (Global Positioning System) – A hand held GPS unit is required to determine the coordinates of spills for use in meeting SWRCB SSO reporting requirements.
Combination Sewer Cleaning Truck – A combination high velocity sewer cleaning truck with vacuum tank is required to clear blockages in gravity sewers, vacuum spilled sewage, and wash-down the impacted area following an SSO event.
Portable Generators, Portable Pumps, Piping, and Hoses – The list of portable equipment that is required to support this plan is included as Appendix 6-J.
6.12. SSO Response Training
This section provides information on the training that is required to support this Overflow Emergency Response Plan.
6.12.1. Initial and Annual Refresher Training
All City personnel who may have a role in responding to, reporting, and/or mitigating a sewer system overflow should receive training on the contents of this OERP. All new employees should receive training before they are placed in a position where they may have to respond. Current employees are receiving annual refresher training on this plan and the procedures to be followed.
6.12.2. SSO Training Record Keeping
Records should be kept of all training that is provided in support of this plan. The records for all scheduled training courses and for each overflow emergency response training event should include date, time, place, content, name of trainer(s), and names of attendees.
Contractors Working on City Sewer Facilities
All contractors working on City sewer facilities will be contractually required to develop a project-specific Overflow Response Plan. All contractor personnel will be required to receive training in the contractor’s Overflow Response Plan and to follow it in the event that they cause or observe an SSO.
163
Item 6.
City of Oroville Page 6-22
Sewer System Management Plan March 30, 2026
Appendix 6-A: After Hours/Emergency Contact Info
City Personnel
Name Role/Title Phone Number
Dispatch After Hours Emergency Notification (530) 538-2448 Jamie McGuire Public Works Operations Manager (530) 353-9479 164
Item 6.
City of Oroville Page 6-23
Sewer System Management Plan March 30, 2026
Appendix 6-B: Sewer Report Form
INITIAL INFORMATION
DATE: _________________________________ CALL RECEIVED: _______________________________AM/PM RECEIVED BY:__________________________ CALLER’S NAME: ____________________________________ CALLER’S PHONE #:____________________ CALLER’S ADDRESS: ____________________________________ LOCATION OF OVERFLOW:____________________________CROSS STREET: ___________________________ TIME AND NAMES OF CREW MEMBERS CONTACTED: ________________________________________________ DESCRIPTION OF COMPLAINT: _________________________________________________________________ FIELD REPORT: FOR RESPONSE CREW’S USE TIME ARRIVED AT SITE: ____________AM/PM CREW NAMES: ______________________________________ ASSET #: _________________ U/S ASSET#: __________________ D/S ASSET#:_______________________ SIZE OF LINE:_______________ LENGTH OF LINE: _____________________ EASEMENT: YES NO GPS COORDINATES: LATITUDE: 34.___________________ LONGITUDE: -118._______________________ COMMENTS: ______________________________________________________________________________ COMPLETE REMAINDER OF FORM IF AN OVERFLOW HAS OCCURRED TIME SSO STARTED:_________ TIME SSO STOPPED: ________ DURATION OF SSO: __________(DAYS/HOURS) EST. TOTAL VOLUME: ____________(GALLONS) RETURNED TO SEWER SYSTEM: ________________(GALLONS) DID SSO REACH SURFACE WATERS? YES NO
VOLUME TO WATERS (INCLUDING STORM DRAIN) THAT WAS NOT RECOVERED: _____________________(GALLONS) SURFACE/RECEIVING WATER LOCATION: ________________________________________________________ DESCRIBE HOW OVERFLOW QUANTITY WAS CALCULATED: EYEBALL ESTIMATE DURATION/FLOWRATE MEASURED VOLUME OTHER ___________________________________________________________ WEATHER: SUNNY CLOUDY RAINY RAIN FOR SEVERAL DAYS ________________________________ PRIMARY CAUSE: ROOTS GREASE DEBRIS VANDALISM CONSTRUCTION DAMAGE PIPE FAILURE PUMP STATION FAILURE POWER FAILURE CAPACITY (HEAVY RAIN) OTHER ________________ SOURCE OF SSO: MANHOLE GRAVITY MAIN FORCE MAIN CLEAN OUT PRIVATE LATERAL PUMP STATION ____________(NAME) OTHER _________________________________________ FINAL SSO DESTINATION: STORM DRAIN CAPTURED FROM STORM DRAIN (100%) BUILDING YARD/LAND SURFACE WATERS NO SURFACE WATERS INVOLVED OTHER ___________________ ADDITIONAL INFORMATION: __________________________________________________________________ SEWER REPORT FORM – PAGE 1
165
Item 6.
City of Oroville Page 6-24
Sewer System Management Plan March 30, 2026
166
Item 6.
City of Oroville Page 6-25
Sewer System Management Plan March 30, 2026
Appendix 6-C: Sample Fax Form for SSO Reporting
167
Item 6.
City of Oroville Page 6-26
Sewer System Management Plan March 30, 2026
Appendix 6-D: Collection System SSO Analysis Form
COLLECTION SYSTEM FAILURE ANALYSIS FORM
INCIDENT REPORT #: ________________________ PREPARED BY:_______________________________ ADDRESS/LOCATION OF SSO:_____________________________________________________________ TOTAL SSO VOLUME: _______________ (GALLONS) VOLUME RECOVERED: ________________ (GALLONS) CAUSE: ROOTS GREASE DEBRIS VANDALISM CONSTRUCTION DAMAGE PIPE FAILURE PUMP STATION FAILURE POWER FAILURE CAPACITY (HEAVY RAIN) OTHER ___________ SUMMARY OF HISTORICAL SSOS, BACKUPS, SERVICE CALLS, OTHER PROBLEMS RECORDS REVIEWED BY: ____________________ RECORD REVIEW DATE: _____________________ EVENT DATE CREW DATE CAUSE/PROBLEM PREVIOUSLY CLEANED RESPONDING TO CALL ___________ ______________________________ ____________________ _________________________ ___________ ______________________________ ____________________ _________________________ ___________ ______________________________ ____________________ _________________________ ___________ ______________________________ ____________________ _________________________ SUMMARY OF CCTV INFORMATION CCTV INSPECTION DATE: _____________________TAPE NAME/NUMBER: _________________________ CCTV TAPE REVIEWED BY: __________________ CCTV REVIEW DATE: _________________________ CCTV OBSERVATIONS: ________________________________________________________________ __________________________________________________________________________________ RECOMMENDATIONS □ NO CHANGES OR REPAIRS REQUIRED
□ MAINTENANCE EQUIPMENT __________________________________________________________ □ MAINTENANCE FREQUENCY __________________________________________________________ □ REPAIR (LOCATION AND TYPE) _______________________________________________________ □ ADD TO CAPITAL IMPROVEMENT REHABILITATION/REPLACEMENT LIST ___________________________ ADDITIONAL INFORMATION: _____________________________________________________________ __________________________________________________________________________________ __________________________________________________________________________________ PUBLIC WORKS SUPERINTENDENT REVIEW DATE: ______/________/___________ 168
Item 6.
City of Oroville Page 6-27
Sewer System Management Plan March 30, 2026
Appendix 6-E: Private Property Damage Procedures
Customer Relations Guidelines
It is important for employees to communicate effectively with the City’s customers, especially in a sewage backup situation. How we communicate – on the phone, in writing, or in person – is how we are perceived. Good communication with the homeowner results in greater confidence in our ability to address the problem satisfactorily, less time to resolve the claim, and less damage done to the property.
As a representative of the City, you will occasionally have to deal with an irate homeowner. A backup is a stressful event and even a reasonable homeowner can become irate should he/she perceive us as being indifferent, uncaring, unresponsive, or incompetent.
Although sometimes difficult, effective management of a sewage backup situation is critical. If it is not managed well, the situation can end up in a costly, prolonged process with the homeowner. We want the homeowner to feel assured that we are responsive and the homeowner’s best interest is a top priority.
Communication Tips
• Give the homeowner ample time to explain the situation or to vent. Show interest in what the homeowner has to say, no matter how many times you have heard it before, or how well you understand the problem.
• As soon as possible, let the customer know that you will determine if the source of the sewer backup is in the sewer main and, if it is, will have it corrected as quickly as you can. • Acknowledge the homeowner’s concerns. For example, if the homeowner seems angry or worried about property damage, say something like, “I understand you’re concerned about the possible damage to your property, but a professional cleanup crew can restore the area, and if it is determined that the City is at fault, the property owner has the right to file a claim for any reasonable repairs or losses resulting from this incident”. • Express regret for any inconveniences caused by the incident, but do not admit fault. • As much as possible, keep the homeowner informed about what is being done and what will be done to correct the problem.
• Keep focused on getting the job done in a very professional manner. Don’t wander from the problem with too much unnecessary small talk with the homeowner. • Don’t find fault or lay blame on anyone.
• Make sure someone follows up with a telephone call to ensure everything is being handled as it should be.
Before you leave, make sure the homeowner has the name and telephone number of someone in the City to call if he/she has questions or wants information. The customer information letter contains this information, and you should take the time to review this with the homeowner. 169
Item 6.
City of Oroville Page 6-28
Sewer System Management Plan March 30, 2026
Appendix 6-F: Methods for Estimating Spill Volume
A variety of approaches exist for estimating the volume of a sanitary sewer spill. This appendix documents the three methods that are most often employed. The person preparing the estimate should use the most appropriate method to the sewer overflow in question and use the best information available.
Method 1 Eyeball Estimate
The volume of small spills can be estimated using an “eyeball estimate”. To use this method, imagine the amount of water that would spill from a bucket or a barrel. A bucket contains 5 gallons, and a barrel contains 50 gallons. If the spill is larger than 50 gallons, try to break the standing water into barrels and then multiply by 50 gallons. This method is useful for contained spills up to approximately 200 gallons.
Method 2 Measured Volume
The volume of most small spills that have been contained can be estimated using this method.
The shape, dimensions, and the depth of the contained wastewater are needed. The shape and dimensions are used to calculate the area of the spills, and the depth is used to calculate the volume.
Common Shapes and Dimensions
Step 1 Sketch the shape of the contained sewage (see figure above).
Step 2 Measure or pace off the dimensions.
Step 3 Measure the depth at several locations and select an average.
Step 4 Convert the dimensions, including depth, to feet.
Step 5 Calculate the area in square feet using the following formulas:
Rectangle: Area = length (feet) x width (feet)
Circle: Area = diameter (feet) x diameter (feet) x 0.785 Triangle: Area = base (feet) x height (feet) x 0.5
Step 6 Multiply the area (square feet) times the depth (in feet) to obtain the volume in cubic feet.
Step 7 Multiply the volume in cubic feet by 7.5 to convert it to gallons.
RECTANGLE CIRCLE TRIANGLE
LENGTH
Rectangle
BASE
W
I
D
T
H
H
E
I
G
H
T
DIAMETER
170
Item 6.
City of Oroville Page 6-29
Sewer System Management Plan March 30, 2026
Method 3 Duration and Flowrate
Calculating the volume of larger spills, where it is difficult or impossible to measure the area and depth, requires a different approach. In this method, separate estimates are made of the duration of the spill and the flowrate. The methods of estimating duration and flowrate are:
Duration: The duration is the elapsed time from the time the spill started to the time that the flow was restored.
Start time: The start time is sometimes difficult to establish. Here are some approaches:
• Local residents can be used to establish start time. Inquire as to their observations. Spills that occur in rights-of-way are usually observed and reported promptly. Spills that occur out of the public view can go on longer. Sometimes observations like odors or sounds (e.g. water running in a normally dry creek bed) can be used to estimate the start time. • Changes in flow on a downstream flowmeter can be used to establish the start time.
Typically, the daily flow peaks are “cut off” or flattened by the loss of flow. This can be identified by comparing hourly flow data during the spill event with flow data from prior days. • Conditions at the spill site change over time. Initially there will be limited deposits of toilet paper and other sewage solids. After a few days to a week, the sewage solids form a lightcolored residue. After a few weeks to a month, the sewage solids turn dark. The quantity of toilet paper and other materials of sewage origin increase over time. These observations can be used to estimate the start time in the absence of other information. Taking photographs to document the observations can be helpful if questions arise later in the process. • It is important to remember that spills may not be continuous. Blockages are not usually complete (some flow continues). In this case the spill would occur during the peak flow periods (typically 10:00 to 12:00 and 13:00 to 16:00 each day). Spills that occur due to peak flows in excess of capacity will occur only during, and for a short period after, heavy rainfall.
End time: The end time is usually much easier to establish. Field crews on-site observe the “blow down” that occurs when the blockage has been removed. The “blow down” can also be observed in downstream flowmeters.
Flow Rate: The flowrate is the average flow that left the sewer system during the time of the spill.
There are three common ways to estimate the flowrate:
• The San Diego Manhole Flowrate Chart: This chart, included as Appendix 6-H, shows sewage flowing from manhole covers at a variety of flowrates. The observations of the field crew can be used to select the appropriate flowrate from the chart. If possible, photographs are useful in documenting basis for the flowrate estimate. 171
Item 6.
City of Oroville Page 6-30
Sewer System Management Plan March 30, 2026
• Flowmeter: Changes in flows in downstream flowmeters can be used to estimate the flowrate during the spill.
• Counting Connections: Once the location of the spill is known, the number of upstream connections can be determined from the sewer maps. Multiply the number of connections by 200 to 250 gallons per day per connection or 8 to 10 gallons per hour per connection.
For example: 22 upstream connections x 9 gallons per hour per connection = 198 gallons per hour / 60 minutes per hour
= 3.3 gallons per minute
Spill Volume: Once duration and flowrate have been estimated, the volume of the spill is the product of the duration in hours or days and the flowrate in gallons per hour or gallons per day.
For example:
Spill start time = 11:00
Spill end time = 14:00
Spill duration = 3 hours
3.3 gallons per minute x 3 hours x 60 minutes/hour = 594 gallons 172
Item 6.
City of Oroville Page 6-31
Sewer System Management Plan March 30, 2026
Appendix 6-G: Manhole Overflow Flowrate Guide
173
Item 6.
City of Oroville Page 6-28
Sewer System Management Plan March 30, 2026
Appendix 6-H: Sample Warning Sign
174
Item 6.
City of Oroville Page 6-29
Sewer System Management Plan March 30, 2026
Appendix 6-I: Emergency Response Equipment
Items No. Quantity Comments
Vactor 1
Flex Rodder 1
Jet Rodder 1
Service Truck 1
Trash Pump 1
175
Item 6.
City of Oroville Page 7-1
Sewer System Management Plan March 30, 2026
Section 7. Sewer Pipe Blockage Control Program
7.1. Introduction
This section of the SSMP presents the City’s approach to preventing FOG-related SSOs. The FOG Control program occurs on an administrative staff level due to the necessity of a program.
7.2. WDR Requirements
The summarized requirements for the Sewer Pipe Blockage Control element of the SSMP are:
The collection system agency shall evaluate its service area to determine whether a Sewer Pipe Blockage control program is needed. If the collection system agency determines that a Sewer Pipe Blockage program is not needed, the collection system agency must provide justification for why it is not needed. If FOG is found to be a problem, the collection system agency must prepare and implement a Sewer Pipe Blockage source control program to reduce the amount of these substances discharged to the sanitary sewer system. The Sewer Pipe Blockage source control program shall include the following as appropriate:
(a) An implementation plan and schedule for a public education outreach program that promotes proper disposal of FOG;
(b) A plan and schedule for the disposal of FOG generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of FOG generated within a sanitary sewer system service area;
(c) The legal authority to prohibit discharges to the system and identify measures to prevent SSOs and blockages caused by Sewer Pipe Blockage; (d) Requirements to install grease removal devices (such as traps or interceptors), design standards for the grease removal devices, maintenance requirements, BMP requirements, record keeping and reporting requirements; (e) Authority to inspect grease producing facilities, enforcement authorities, and a determination of whether the Agency has sufficient staff to inspect and enforce the Sewer Pipe Blockage ordinance;
(f) An identification of sewer system sections subject to Sewer Pipe Blockage and the establishment of a cleaning maintenance schedule for each section; and (g) Development and implementation of source control measures, for all sources of Sewer Pipe Blockage discharged to the sewer system, for each sewer system section identified in (f) above.
176
Item 6.
City of Oroville Page 7-2
Sewer System Management Plan March 30, 2026
7.3. Nature and Extent of Sewer Pipe Blockage Problem
Due to the frequency of CCTV-ing that occurs in the city, areas where Sewer Pipe Blockage related issues have a higher probability of occurring have been determined and put on a 1-to-2-month cleaning schedule. The City has only experienced one SSO due to Fats, Oils, and Grease since 2014. The city also intends to send out public education brochures regarding FOG to homeowners with the property tax and sewer fee invoice. The most recent SSO events in the past 5 years is shown in Table 7-1.
Table 7-1: FOG-Related SSO Events
Date
CIWQS
SSO Event
ID Location
Volume to
Surface Waters,
gallons
Character of
Nearby
Service Area
2014 725111 Oroville Dam Blvd., East 0 Commercial
Total 0
The City requires new and remodeled FOG sources to install grease removal equipment as a condition of the building permit.
7.4. Sewer Pipe Blockage Source Control Program
The performance of the City’s chosen approach to preventing Sewer Pipe Blockagerelated SSOs has been effective, and it will continue to follow this approach. The City will continue to require new and remodeled commercial FOG sources to install grease removal equipment. It will collect data to support a more comprehensive evaluation of the nature and extent of its FOG-related blockages and SSOs. The City will revisit the need for a commercial Sewer Pipe Blockage Control Program every time the SSMP is updated.
177
Item 6.
City of Oroville Page 8-1
Sewer System Management Plan March 30, 2026
Section 8. System Evaluation and Capacity
Assurance Plan
8.1. Introduction
This section of the SSMP presents the City’s programs and activities to provide adequate sewer system capacity.
8.2. WDR Requirements
The summarized requirements for the System Evaluation and Capacity Assurance Plan (SECAP) element of the SSMP are:
The Agency shall prepare and implement a capital improvement plan (CIP) that will provide hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, as well as the appropriate design storm or wet weather event. At a minimum, the plan must include:
(a) Evaluation: Actions needed to evaluate those portions of the sanitary sewer system that are experiencing or contributing to an SSO discharge caused by hydraulic deficiency. The evaluation must provide estimates of peak flows (including flows from SSOs that escape from the system) associated with conditions similar to those causing overflow events, estimates of the capacity of key system components, hydraulic deficiencies (including components of the system with limiting capacity) and the major sources that contribute to the peak flows associated with overflow events.
(b) Design Criteria: Where design criteria do not exist or are deficient, undertake the evaluation identified in (a) above to establish appropriate design criteria. (c) Capacity Enhancement Measures: The steps needed to establish a short- and long-term CIP to address identified hydraulic deficiencies, including prioritization, alternatives analysis, and schedules. The CIP may include increases in pipe size, inflow and infiltration (I/I) reduction programs, increases and redundancy in pumping capacity, and storage facilities. The CIP shall include an implementation schedule and shall identify sources of funding. (d) Schedule: The Agency shall develop a schedule of completion dates for all portions of the capital improvement program developed in (a)-(c) above. This schedule shall be reviewed and updated consistently with the SSMP review and update requirements as described in Section D. 14 (of the WDR). 178
Item 6.
City of Oroville Page 8-2
Sewer System Management Plan March 30, 2026
8.3. Evaluation – Sanitary Sewer Master Plan
The City completed a Sanitary Sewer Master Plan Update (Master Plan) in 2013. The master planning effort included flow monitoring and the development of a hydraulic model.
The flows were estimated for gravity sewers 10 inches in diameter and larger (some 8- inch sewers were included in the model) and a 10-year/24-hour return interval design storm. Approximately 75 pipes and 57 manholes did not meet the City’s wet weather surcharge of 3 feet below the rim elevation.
The Master Plan identified two locations where capacity deficiencies exist for the peak wet weather flow (PWWF) design storm and five additional areas of concern. More information regarding these locations can be found in Section 6.4.4 of the 2013 Sanitary Sewer Master Plan.
The Capital Improvement Program (CIP) is reviewed and updated annually.
8.4. Design Criteria
The capacity-related design criteria, including base wastewater flow and peaking factors, are included in Section 5 of the SSMP, Design and Performance Provisions.
8.5. Capacity Enhancement Measures – CIP
The City’s Capital Improvement Program for sewer main capacity improvements is shown in Appendix 4-B.
179
Item 6.
City of Oroville Page 9-1
Sewer System Management Plan March 30, 2026
Section 9. Monitoring, Measurement, and Program
Modifications
9.1. Introduction
This section presents the City’s approach to Monitoring, Measurement, and Program Modifications.
9.2. WDR Requirements
The requirements for the Monitoring, Measurement, and Program Modifications (MMPM) section of the SSMP are:
The Enrollee shall:
(a) Maintain relevant information that can be used to establish and prioritize appropriate SSMP activities;
(b) Monitor the implementation and, where appropriate, measure the effectiveness of each element of the SSMP;
(c) Assess the success of the preventative maintenance program; (d) Update program elements, as appropriate, based on monitoring or performance evaluations; and
(e) Identify and illustrate SSO trends, including frequency, location, and volume.
9.3. Performance Measures
The indicators that the City will use to measure the performance of its sanitary sewer system and the effectiveness of its SSMP are:
• Total number of SSOs;
• Number of SSOs for each cause (roots, grease, debris, pipe failure, capacity, lift station failure, and other);
• Portion of sewage contained compared to total volume spilled; • Volume of spilled sewage discharged to surface water; and • Planned to actual performance for preventive maintenance.
9.4. Historical Performance Data
The City has limited historical performance data at this time. The City has been reporting SSOs through CIWQS since September 2, 2007.
9.5. Baseline Performance
The baseline performance, which shows the performance of the City’s sanitary sewer system prior to implementation of the SSMP, is shown on Table 9-1. 180
Item 6.
City of Oroville Page 9-2
Sewer System Management Plan March 30, 2026
Table 9-1: Baseline Performance as of September 9, 2025 covering period of February 8, 2020 through September 9, 2025
Performance Measure Value
Number of SSOs/year 1.6
SSO Rate, SSOs/100 miles/year 1.05
Median SSO Volume, gallons/year 1,388
Portion of SSOs ≤ 100 gallons 75%
SSO Causes Roots 35%
Grease 0%
Debris 26.5%
Pipe/ Lift Station
Failure 6%
Conditions 3%
Other 20.5%
Portion of Spilled Sewage Contained/Recovered 11%
Portion of Spilled Sewage Entering Storm Drains and/or Surface Waters 11%
Data Source: CIWQS
9.6. Performance Monitoring and Program Changes
The City will evaluate the performance of its sanitary sewer system annually using the performance measures identified in Section 9.3, Performance Measures (above) using the baseline performance to determine the trends. The City may use other performance measures in its evaluation.
9.7. SSMP Updates
The City will update its SSMP at least every three years. The next update will be completed in 2028.
The City will determine the need to update its SSMP more frequently based on the results of the semi-annual audit and the performance of its sanitary sewer system. In the event that the City decides that an update is warranted, the process to 181
Item 6.
City of Oroville Page 9-3
Sewer System Management Plan March 30, 2026
complete the update will be identified at that time. The City will complete the update within one year following identification of the need for the update.
City Staff will seek approval from the City Council for any significant changes to the SSMP. The authority for approval of minor changes such as employee names, contact information, or minor procedural changes is delegated to Public Works Director. 182
Item 6.
City of Oroville Page 10-1
Sewer System Management Plan March 30, 2026
Section 10. Internal Audits
10.1. Introduction
This section of the SSMP presents the process that the City will follow to audit its SSMP program.
10.2. WDR Requirements
The summarized regulatory requirements for the SSMP are:
As part of the SSMP, the City shall conduct periodic internal audits, appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur every two years and a report must be prepared and kept on file. The audit shall focus on evaluating the effectiveness of the SSMP and the Enrollee’s compliance with the SSMP requirements identified in Subsection D.13 of the WDR, including identification of any deficiencies in the SSMP and steps to correct them.
10.3. SSMP Audits
The City will audit its SSMP every three years. The audit will determine whether the SSMP meets the current requirements of the WDR, whether the SSMP reflects the City’s current practices, and whether the City is following the SSMP. The next audit be performed in 2026.
The audit will be conducted by a team consisting of City Staff. The City may choose to include representatives from nearby agencies and/or consultants on the audit team.
The scope of the audit will cover each of the sections of the SSMP. The SSMP Audit Checklist based on the requirements in the WDR is included in Appendix 10-A.
The results of the audit will be included in the SSMP Audit Report. The SSMP Audit Report will focus on the effectiveness of the SSMP program, compliance with the WDR requirements, and identification of any deficiencies in the SSMP. The SSMP Audit Report will identify revisions that may be needed for a more effective program.
Information collected as part of Section 9 – Monitoring, Measurement, and Program Modifications will be used in preparing the audit. Tables and figures or charts will be used to summarize information about performance indicators.
The City will certify that it has completed the semi-annual audit using CIWQS. Copies of the semi-annual Audit Reports will be retained by the City for five years. 183
Item 6.
City of Oroville Page 10-2
Sewer System Management Plan March 30, 2026
Appendix 10-A: SSMP Audit Checklist
184
Item 6.
City of Oroville Page 11-1
Sewer System Management Plan March 30, 2026
Section 11. Communication Program
11.1. Introduction
This section of the SSMP is intended to outline the process involved in communicating with interested members of the public regarding the development, implementation, and performance of this plan.
11.2. WDR Requirements
The requirements for the Communication Program section of the SSMP are:
The Agency shall:
(a)Communicate on a regular basis with the public on the development, implementation, and performance of its SSMP. The communication system shall provide the public the opportunity to provide input to the Agency as the program is developed and implemented.
(b) Create a plan of communication with systems that are tributary and/or satellite to the Agency’s sanitary sewer system.
11.3. Communication during SSMP Development and Implementation The City will post a notice on its website to inform interested members of the public it is developing an SSMP. The notice is:
The City of Oroville is developing and implementing a Sewer System Management Plan (SSMP) pursuant to State Water Resources Control Board Order 2022-0103, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. The goal of the SSMP is to minimize the frequency and severity of sanitary sewer overflows. The SSMP will cover the management, planning, design, and operation and maintenance of the City’s sanitary sewer system. The development process began in December of 2025 and a public draft SSMP was completed in March 2026. Interested parties can contact Tim Kaber at (530)-538- 2540 or [email protected] for additional information regarding the SSMP.
11.4. Communicating Sanitary Sewer System Performance
The City reports SSOs electronically to the California Integrated Water Quality System (CIWQS). The electronic SSO data, as well as information regarding regulatory actions, is available at:
http://www.waterboards.ca.gov/ciwqs/publicreports.html.
The City will place a notice on its website that the sanitary sewer performance information is available at the CIWQS public access website. 185
Item 6.
City of Oroville Page 11-2
Sewer System Management Plan March 30, 2026
11.5. Communication w/Tributary/Satellite SS Systems
The City is one-third of a Joint Powers Agreement (JPA) with the Sewerage Commission – Oroville Region (SC-OR) that handles the wastewater treatment and disposal. The three entities in the JPA are City of Oroville, Lake Oroville Area Public utilities District (LOAPUD) and Thermalito Irrigation District (TID). The City provides the wastewater collection services which discharge into a SC-OR interceptor pipeline.
SC-OR
City of Oroville Thermalito Water
and Sewer District
Lake Oroville Area
Public Utilities
District
186
Item 6.
City of Oroville Page 11-3
Sewer System Management Plan March 30, 2026
Attachment A
Maintenance Logs
187
Item 6.
City of Oroville Page 11-4
Sewer System Management Plan March 30, 2026
Attachment B
Staff Training Certifications
188
Item 6.
City of Oroville Page 11-5
Sewer System Management Plan March 30, 2026
Attachment C
CIWQS SSO Spill Report
189
Item 6.
City of Oroville Page 11-6
Sewer System Management Plan March 30, 2026
Attachment D
Spill Response
190
Item 6.
City of Oroville Page 11-7
Sewer System Management Plan March 30, 2026
Attachment E
Compliance Evaluation Inspection Report
191
Item 6.
CITY OF OROVILLE
RESOLUTION NO. 9542
A RESOLUTION OF THE CITY OF OROVILLE CITY COUNCIL ADOPTING THE
UPDATED SEWER SYSTEM MASTER PLAN
WHEREAS, the City of Oroville has completed an update of the Sewer System Master Plan according to State of California State Water Resources Control Board requirements,
WHEREAS the State Water Resources Control Board requires a periodic audit, update, and recertification of the SSMP every 6 years,
NOW, THEREFORE, BE IT RESOLVED by the Oroville City Council as follows:
1. The Council hereby adopts and recertifies the Sewer System Master Plan.
2. The Mayor is hereby authorized and directed to execute this Resolution,
3. The City Clerk shall attest to the adoption of this Resolution.
PASSED AND ADOPTED by the Council of the City of Oroville at a regular meeting held on April 21, 2026, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT: __________________________
David Pittman, Mayor
APPROVED AS TO FORM: ATTEST:
__________________________ __________________________
David Ritchie, Asst. City Attorney Kayla Reaster, Assist. City Clerk 192
Item 6.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: PATRICK PIATT, COMMUNITY DEVELOPMENT DIRECTOR
RE: AGREEMENT WITH STRATEGIC EXPERTS LLC FOR MUNICIPAL
UTILITY AND COMMUNITY CHOICE AGGREGATION ADVISORY
SERVICES
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider approving an agreement with Strategic Energy Experts LLC (SEE) to provide advisory services related to the City’s ongoing evaluation of local energy options, including a potential municipal electric utility and/or Community Choice Aggregation (CCA) program. SEE’s role will be limited to advisory support, with the potential to assist in future implementation efforts should the City determine that forming a CCA is financially feasible.
DISCUSSION
The City of Oroville continues to explore opportunities to enhance local control over energy resources, improve reliability, and reduce long-term costs for residents and businesses. Strategic Energy Experts LLC (SEE) has submitted a proposal to provide advisory services to support the City throughout this process. SEE brings extensive experience in California’s energy market and has supported the formation and operation of numerous CCAs, including Butte Choice Energy.
Under the proposed agreement, SEE will serve in an advisory capacity. Their role will include providing strategic guidance, technical insight, and support in understanding the regulatory, operational, and structural considerations associated with municipal utility and CCA models. This includes assisting staff in interpreting feasibility findings, evaluating options, and preparing for potential next steps.
Importantly, SEE is not being engaged to conduct the financial feasibility analysis itself, as that work is being performed by a separate consultant under a different agreement.
Instead, SEE’s involvement is intended to complement that effort by ensuring the City is well-positioned to understand and act upon the results. 193
Item 7.
Should the feasibility analysis determine that formation of a CCA is financially viable and aligned with the City’s policy objectives, SEE may assist the City in subsequent steps, including implementation planning, regulatory coordination, and program development.
This phased and advisory-focused approach allows the City to maintain flexibility, limit upfront commitments, and make informed decisions based on independent financial analysis while still benefiting from SEE’s deep experience in utility and CCA development.
FISCAL IMPACT
The agreement with Strategic Energy Experts LLC will be structured on a time-andmaterials basis, with total compensation not to exceed $15,000. Hourly rates range from $130 to $285 depending on staff level.
ACTION REQUESTED -
APPROVE AGREEMENT WITH STRATEGIC ENERGY EXPERTS LLC; AND
AUTHORIZE THE MAYOR TO EXECUTE THE AGREEMENT AND ANY MINOR
ADMINISTRATIVE AMENDMENTS
ATTACHMENTS
Agreement – Strategic Energy Experts LLC
Proposal – Strategic Energy Experts LLC
194
Item 7.
195
Item 7.
196
Item 7.
197
Item 7.
198
Item 7.
199
Item 7.
200
Item 7.
201
Item 7.
202
Item 7.
203
Item 7.
Gary Saleba, Executive Consultant
[email protected]
direct 425-655-1039
cell 425-260-6678
City of Oroville, California
2026
MUNICIPAL UTILITY AND CUSTOMER CHOICE
AGGREGATE ADVISOR
STRATEGIC ENERGY EXPERTS LLC | 7002 Soundview Drive, Gig Harbor, WA 98335 204
Item 7.
Gary Saleba 425.260.6678 [email protected] i
S.E.E.
STRATEGIC ENERGY EXPERTS LLC
February 26, 2026
Mr. Brian Ring
City Manager
City of Oroville
1735 Montgomery Street
Oroville, CA 95965
SUBJECT: Municipal Utility and Customer Choice Aggregate Advisor Dear Mr. Ring:
Strategic Energy Experts LLC (SEE) is pleased to submit this proposal response to the City of Oroville (City) to advise on setting up a City municipal utility and/or Community Choice Aggregation (CCA) entity. SEE can provide significant value to the City based on the following unique and relevant work:
1. SEE has stood up more CCAs than any of our competition, and our diverse and highly skilled team of professionals can provide a wider scope of services to serve a full spectrum of utility/CCA needs.
Unlike other firms that specialize solely on regulatory, financial, power procurement or data management, these firms do not have the full bandwidth of expertise uniquely enjoyed by SEE to cover all aspects of utility operations.
2. SEE was the feasibility and start-up consultant for Butte Choice Energy (BCE) and has already developed the load and modeling tools specific to BCE. With little effort, these existing tools can be updated with new data to provide feasibility results in a very efficient and low cost manner.
3. SEE has an established working relationship with City staff. We understand the uniqueness of the region and enjoy working with the City’s team. SEE won’t need to use time getting “up to speed” on the City’s history and past precedents.
4. SEE is very responsive to requests from our clients. We will respond immediately and accurately when asked whereas other consultants often require more lead time.
5. SEE provides unbiased analysis and has a demonstrated history of delivering recommendations against utility start-up when the timing and/or financial feasibility has been poor.
Please find enclosed our qualifications, proposed scope of work and fee structure. We look forward to working with the City and hope to hear back from you at your earliest convenience. In the meantime, feel free to call with any questions.
Very truly yours,
Gary S. Saleba
Principal
STRATEGIC ENERGY EXPERTS LLC
205
Item 7.
Gary Saleba 425.260.6678 [email protected] i
TABLE OF CONTENTS
SEE QUALIFICATIONS........................................................................................................1 Past Clients....................................................................................................................................................................1 Past Experience............................................................................................................................................................1 Key Personnel...............................................................................................................................................................2 Scope of Work .............................................................................................................................................................2 Cost of Services ...........................................................................................................................................................3 206
Item 7.
Gary Saleba 425.260.6678 [email protected]
SEE QUALIFICATIONS
PAST CLIENTS
SEE has significant experience in the California utility community. Please feel free to contact any of our references provided below to learn more about how SEE has provided valuable work products in the California utility space.
Project Scope Various
Client, Location Calpine
Contact Name & Title Drake Welch, Senior Vice President CCA Business Unit Phone (619) 684-8039 Email [email protected] Project Outcome: SEE has coordinated seamlessly with Calpine to serve various CCAs as the start-up and operating consultant.
Project Scope County-Only CCA Feasibility, Investigation of Partnering Client, Location County of San Diego, CA
Contact Name & Title Charley Marchesano, Chief, Energy and Sustainability Program Phone (858) 694-2987 Email [email protected] Project Outcome: Study declared CCA feasible. SEE assisted with investigation on joining/forming other JPAs.
County ultimately joined San Diego Community Power.
Project Scope 3 City and Individual Cities CCA Feasibility Study Client, Location Cities of Vista, Escondido, and San Marcos - San Diego County, CA Contact Name & Title John Conley, Director of Community Development/Engineering Phone (760) 643-5388 Email [email protected]
Project Outcome: Study declared joint-city and individual cities CCA feasible. Study was recently completed, SEE assisted with presentationsto City Councils and other public meetings. SEE assisted cities in investigating joining other regional CCAs.
Project Scope Various CCA Related Projects
Client, Location Best, Best, and Krieger LLP., CA
Contact Name & Title Ryan Baron, Counsel
Phone (949) 263-6568 Email [email protected]
Project Outcome: SEE has worked alongside and for BB&K on several CCA-related projects.
PAST EXPERIENCE
SEE has significant experience in the California utility community. We have previously prepared CCA Feasibility Analyses, Business Plans, and/or Implementation Plans for the Counties of Butte, San Diego, Los Angeles, Alameda, and Ventura; the San Bernardino Associated Governments; the Coachella Valley Association of Governments; the Western Riverside Council of Governments; the City of San José; the cities of Encinitas, Carlsbad, Del Mar and Oceanside; the cities of Chula Vista, La Mesa, Santee; the Cities of Vista, San Marcos and Escondido; and the City of Irvine. SEE has provided start-up services to Clean Power Alliance, San Jose Clean Energy, East Bay Community Energy, Western Community Energy, Orange County Power Authority, and Butte Choice Energy Authority. SEE has also provided CCA Feasibility Peer Review services for the City of Solana Beach, the City of San Diego, and King City. SEE has also provided 207
Item 7.
Gary Saleba 425.260.6678 [email protected] start-up advice to the South San Joaquin Irrigation District and Nevada Irrigation District. Finally, SEE is an ongoing participant in numerous utility-related regulatory proceedings at the California Public Utility Commission (CPUC), including the Power Charge Indifference Adjustment (PCIA) and Resource Adequacy (RA) proceedings.
KEY PERSONNEL
Gary Saleba will serve as Project Manager for staff on this project. Gary has led SEE in the development of all of the California utility experience work listed above in all IOU territories. Howard Choy has decades of relevant CCA and electric utility experience. Leveraging this experience, SEE can guarantee its ability to deliver results on schedule and on budget. SEE will work closely with staff from the City to account for their priorities and concerns in the analysis.
Gary Saleba, Principal ● Gary Saleba has over 40 years of experience in providing consultant services to electric power utilities and has worked for electric power utility clients ever since. Gary’s areas of specialty include overall quality control for SEE’s projects as well as development of corporate management, financial and strategic planning models primarily for electric, natural gas and water utilities.
He has extensive experience in the areas of utility rate design, revenue requirement analysis, cost of service, financial planning, management audits, professional development educational seminars, marketing, consumer research, forecasting, integrated resource planning, cost-benefit analyses, overall strategic planning, and mergers and acquisitions. Having worked as a utility employee, Gary combines an extensive background as both a utility industry expert and a management consultant. Gary has participated in numerous generic utility proceedings, testified before over 200 regulatory bodies and courts of law and coordinated over 500 financial planning, rate study, resource acquisition, and strategic planning studies. Gary has been the lead on almost every CCA study SEE has completed in California. The number of CCA studies SEE has conducted in California exceed 20.
Howard Choy, Executive Consultant ● Howard Choy brings more than 30 years of diversified experience in the energy industry. He has spent the last seven years supporting SEE’s CCA feasibility study and business plan development in California. Prior to this, he spent 17 years as General Manager over Los Angeles County’s Office of Sustainability which oversees energy and environmental programs for both municipal operations and the Los Angeles County regional community budgeted at about $250 million per year. Notably, Mr. Choy acquired nearly $100 million for the County and the region in federal and state funding for these programs. Mr. Choy led the development of L.A. County’s CCA initial assessments, Feasibility Study and plan for implementation. Mr. Choy also oversaw the County’s energy-related legislative and regulatory efforts and is recognized as an industry leader in clean energy programs in the State legislature, California Public Utilities Commission, California Energy Commission, and within local government energy venues.
SCOPE OF WORK
SEE will assist the City in evaluating all of the energy options available. Specifically, SEE will look at the relative merits of forming a fully integrated City electric utility municipality versus a City-wide CCA.
The full scope of work for SEE is difficult to project at this early juncture of the project, but below is a list of possible tasks for SEE where we will coordinate, manage, supervise and advise. 208
Item 7.
Gary Saleba 425.260.6678 [email protected] Withdrawal from Pioneer Community Energy and Its Costs Analyze Muni vs. CCA Structures
Muni/CCA financial Feasibility Study
Coordinate with City Policy Workers
Work with Calpine and PG&E on Data Transfer
Implementation Plan for CPUC
Initial Customer Information Development
Customer Programs
Rate Design Options
Initial Financing Procurement
Other City Energy Options
Depending on SEE’s final scope of work, other technical subconsultants may be added to our team.
COST OF SERVICES
SEE’s hourly rates are as provided below.
Hourly Rates
Principal/Executive Consultant $285
Managing Director $250
Project Manager $200
Senior Administrative Assistant $130
These rates will remain in effect through the duration of the contract. 209
Item 7.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: MEGAN WILLIAMS – HR ANALYST
RE: UPDATED JOB DESCRIPTION FOR ASSOCIATE CIVIL ENGINEER TO
ASSOCIATE CIVIL ENGINEER/PROJECT MANAGER
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider updates to the job description of Associate Civil Engineer, adding in responsibilities associated with project management, and renaming the classifications Associate Civil Engineer/Project Manager.
DISCUSSION
The City Council will consider adopting the attached Associate Civil Engineer/Project Manager job description. The Associate Civil Engineer job description has been updated to reflect the duties and responsibilities currently required of the position.
These revisions ensure alignment between the role’s actual functions and organizational needs, support clearer performance expectations, and maintain consistency with industry standards.
FISCAL IMPACT
None.
ACTION REQUESTED -
ADOPT THE UPDATED JOB DESCRIPTION FOR ASSOCIATE CIVIL
ENGINEER/PROJECT MANAGER (FORMERLY ASSOCIATE CIVIL ENGINEER).
ATTACHMENTS
1. Associate Civil Engineer/Project Manager job description(clean).
2. Former Associate Civil Engineer job description with recommended changes. 210
Item 8.
Council Approved:
CITY OF OROVILLE
ASSOCIATE CIVIL ENGINEER/ PROJECT MANAGER
DEFINITION
To perform responsible and difficult engineering and project management work in the design, investigation, construction and inspection of public works and facilities; to perform a variety of administrative engineering functions; and to perform related work as required.
SUPERVISION REVEIVED AND EXERCISED
Under general direction of the City Engineer.
EXAMPLES OF ESSENTAIL FUNCTIONS
Prepare plans and specifications for the design, construction, and maintenance/operation of a variety of public works facilities and projects, including wastewater utility, solid waste, street, storm drain, storm water management, and traffic/transportation systems; ensure conformance to City standards and practices.
Research project design requirements and perform related calculations; conduct plan checks to ensure contractor and/or in-force compliance with City and various environmental regulatory standards; prepare time and material cost estimates, especially as related to existing or anticipated project budgets.
Develop, award, and maintain on-call and professional services contracts for a variety of engineering disciplines in order to design Capital Projects for construction. Assists in preparing plans, specifications, and bid documents; reviews bids and makes recommendations based on established criteria.
Assures as-built records of projects, and documents necessary changes for the operation and maintenance programs.
Inspects and monitors Storm Water Pollution Prevention Plans and Construction Storm Water permit requirements to ensure compliance with State and Federal regulations.
Provide Construction Management for construction and capital improvement projects per CalTrans LAPM procedures. Submit required reports accurately and on time as required per project funding source, i.e. CalSMARTS for federal and state funded projects.
Delegate routine research, design, and drafting tasks to technical staff; review completed work and identify solutions for solving design, construction, maintenance/operational problems; research publications and industry information sources as needed.
211
Item 8.
Council Approved:
Order survey, mapping, and data collection as appropriate; perform field inspections, including survey work as necessary, to investigate and resolve field problems affecting property owners, contractors, and maintenance operations; prepare estimates and feasibility reports for new or modified services and structures.
Review and process private development plans as related to streets, storm drains, traffic/transportation, water/wastewater utilities, solid waste systems, and related public works facilities and systems; ensure that such plans comply with City standards and requirements.
Prepare engineering studies and reports; participate in coordinating public works-related activities with other City departments, divisions, and sections, outside agencies, citizens, consultants, and developers; provide staff support to a variety of City boards, commissions, and committees as assigned.
May participate in selection of staff; provide or coordinate staff training; work with employees to correct deficiencies; implement discipline procedures.
Prepare budget related to area of assignment.
Build and maintain positive working relationships with co-workers, other City employees, and the public using principles of good customer service.
Oversee, train, and evaluate the work of technical staff, as assigned.
Perform related duties as assigned.
MINIMUM QUALIFICATIONS
Knowledge of:
Pertinent federal, state, and local laws, regulations, standards, codes, and ordinances.
Principles and practices of civil engineering and surveying as applied to municipal public works projects.
Modern methods and techniques used in the design, construction, and maintenance of public works improvements.
Basic mathematics, algebra, geometry, trigonometry, calculus, statistics, economics physics, chemistry, biology, environmental science, geology, soils/geotechnical engineering, mechanics of materials, structural analysis/design, hydrology, hydraulics, traffic/transportation engineering, surveying, and drafting.
Proper use of manual and computer-aided drafting methods and equipment including the use of AutoCAD software.
Methods, materials, and equipment used in construction and facility maintenance. 212
Item 8.
Council Approved:
CalTrans Local Assistance Procedure Manual policies and procedures.
Research/analysis methods and sources of information related to public works engineering.
Modern office practices and technology, including the use of computers for word and data processing, computer-aided design, and spreadsheet applications.
Methods of letter writing and report preparation.
English usage, spelling, grammar, and punctuation.
Safe work practices.
Ability to:
Read, learn, understand, interpret, and apply department policies and procedures, and pertinent federal, state, and local laws, codes, ordinances, rules, regulations, and standards pertaining to department operations.
Compile information from site checks, field notes and photos from which to prepare engineering documents.
Prepare accurate engineering drawings, plans, maps, and other documents using manual and computer-aided methods.
Read, interpret, and understand complex plans, specifications, and blueprints.
Conduct necessary engineering research/analysis and prepare technical reports.
Apply technical knowledge and follow proper inspection techniques to examine workmanship and materials, and detect deviations from plans, specifications, regulations, and standard engineering practices.
Establish and maintain accurate and complete files and records.
Understand and follow oral and written instructions independently.
Perform required mathematical and engineering computations with accuracy.
Communicate clearly and concisely, both orally and in writing.
Safely operate basic office equipment and engineering tools.
Establish and maintain effective working relationships with those contacted in the course of work.
Represent the City effectively in meetings with others. 213
Item 8.
Council Approved:
Interpret departmental projects and programs to the public.
EXPERIENCE
At least two (2) years of progressively responsible experience managing capital improvement or construction projects, including budget and contract administration.
Public sector experience is highly desirable.
EDUCATION
Bachelor’s degree from an accredited college with major course work in civil engineering and a California Professional Civil Engineering License, or the ability to obtain within 12-months from time of appointment.
ADDITIONAL REQUIREMENT
Possession and maintenance of a valid California Drivers’ License.
TYPICAL WORKING CONDITIONS
Work is performed in an office and field environment. Incumbent drives on surface streets and may be exposed to traffic and construction hazards, electrical currents, air contaminants, adverse weather conditions, temperature and noise extremes, wetness, humidity, heights, fumes, dusts, odors, toxic or caustic chemicals and vibrations.
TYPICAL PHYSICAL REQUIREMENTS
Requires the mobility to work primarily in an office environment; some outdoor work is required in the inspection of various land use developments, construction sites and public works facilities. Requires the ability to sit at desks for long periods of time and intermittently walk, stand climb, balance, stoop, kneel, crouch, crawl and reach while performing office duties and/or field work; lift and/or move up to 25 pounds occasionally; use hands to finger, handle, feel or operate objects, tools, and controls. Must be able to maintain effective audio-visual discrimination and perception needed for making observations, communicating with others, reading, and writing, and operating office equipment. Must be able to use a telephone to communicate verbally and a keyboard to communicate through written means, to review information and enter/retrieve data, to see and read characters on a computer screen.
This class specification lists the major duties and requirements of the job and is not all-inclusive. Incumbents may be expected to perform job-related duties other than those contained in this document.
214
Item 8.
Council Approved:
CITY OF OROVILLE
ASSOCIATE CIVIL ENGINEER/ PROJECT MANAGER
DEFINITION
To perform responsible and difficult engineering and project management work in the design, investigation, construction and inspection of public works and facilities; to perform a variety of administrative engineering functions; and to perform related work as required.
SUPERVISION REVEIVED AND EXERCISED
Under general direction of the Senior Civil Engineer/Project ManagerCity Engineer.
EXAMPLES OF ESSENTAIL FUNCTIONS
Prepare plans and specifications for the design, construction, and maintenance/operation of a variety of public works facilities and projects, including wastewater utility, solid waste, street, storm drain, storm water management, and traffic/transportation systems; ensure conformance to City standards and practices.
Research project design requirements and perform related calculations; conduct plan checks to ensure contractor and/or in-force compliance with City and various environmental regulatory standards; prepare time and material cost estimates, especially as related to existing or anticipated project budgets.
Develop, award, and maintain on-call and professional services contracts for a variety of engineering disciplines in order to design Capital Projects for construction. Assists in preparing plans, specifications, and bid documents; reviews bids and makes recommendations based on established criteria.
Assures as-built records of projects, and documents necessary changes for the operation and maintenance programs.
Inspects and monitors Storm Water Pollution Prevention Plans and Construction Storm Water permit requirements to ensure compliance with State and Federal regulations.
Provide Construction Management for construction and capital improvement projects per CalTrans LAPM procedures. Submit required reports accurately and on time as required per project funding source; i.e. CalSMARTS for federal and state funded projects.
Delegate routine research, design, and drafting tasks to technical staff; review completed work and identify solutions for solving design, construction, maintenance/operational problems; research publications and industry information sources as needed.
Formatted: Font: (Default) Arial
215
Item 8.
Council Approved:
Order survey, mapping, and data collection as appropriate; perform field inspections, including survey work as necessary, to investigate and resolve field problems affecting property owners, contractors and maintenance operations; prepare estimates and feasibility reports for new or modified services and structures.
Review and process private development plans as related to streets, storm drains, traffic/transportation, water/wastewater utilities, solid waste systems, and related public works facilities and systems; ensure that such plans comply with City standards and requirements.
Prepare engineering studies and reports; participate in coordinating public works-related activities with other City departments, divisions, and sections, outside agencies, citizens, consultants, and developers; provide staff support to a variety of City boards, commissions, and committees as assigned.
May participate in selection of staff; provide or coordinate staff training; work with employees to correct deficiencies; implement discipline procedures.
Prepare budget related to area of assignment.
Build and maintain positive working relationships with co-workers, other City employees, and the public using principles of good customer service.
Oversee, train, and evaluate the work of technical staff, as assigned.
Perform related duties as assigned.
MINIMUM QUALIFICATIONS
Knowledge of:
Pertinent federal, state, and local laws, regulations, standards, codes, and ordinances.
Principles and practices of civil engineering and surveying as applied to municipal public works projects.
Modern methods and techniques used in the design, construction, and maintenance of public works improvements.
Basic mathematics, algebra, geometry, trigonometry, calculus, statistics, economics physics, chemistry, biology, environmental science, geology, soils/geotechnical engineering, mechanics of materials, structural analysis/design, hydrology, hydraulics, traffic/transportation engineering, surveying, and drafting.
Proper use of manual and computer-aided drafting methods and equipment including the use of AutoCAD software.
Methods, materials, and equipment used in construction and facility maintenance. 216
Item 8.
Council Approved:
CalTrans Local Assistance Procedure Manual policies and procedures.
Research/analysis methods and sources of information related to public works engineering.
Modern office practices and technology, including the use of computers for word and data processing, computer-aided design, and spreadsheet applications.
Methods of letter writing and report preparation.
English usage, spelling, grammar, and punctuation.
Safe work practices.
Ability to:
Read, learn, understand, interpret, and apply department policies and procedures, and pertinent federal, state, and local laws, codes, ordinances, rules, regulations, and standards pertaining to department operations.
Compile information from site checks, field notes and photos from which to prepare engineering documents.
Prepare accurate engineering drawings, plans, maps, and other documents using manual and computer-aided methods.
Read, interpret, and understand complex plans, specifications, and blueprints.
Conduct necessary engineering research/analysis and prepare technical reports.
Apply technical knowledge and follow proper inspection techniques to examine workmanship and materials, and detect deviations from plans, specifications, regulations, and standard engineering practices.
Establish and maintain accurate and complete files and records.
Understand and follow oral and written instructions independently.
Perform required mathematical and engineering computations with accuracy.
Communicate clearly and concisely, both orally and in writing.
Safely operate basic office equipment and engineering tools. 217
Item 8.
Council Approved:
Establish and maintain effective working relationships with those contacted in the course of work.
Represent the City effectively in meetings with others.
Interpret departmental projects and programs to the public.
EXPERIENCE
Two years, full-time of progressively responsible experience comparable to that of assistant or entry level engineer.
At least two (2) years of progressively responsible experience managing capital improvement or construction projects, including budget and contract administration.
Public sector experience is highly desirable.
EDUCATION
Bachelor’s degree from an accredited college with major course work in civil engineering and a California Professional Civil Engineering License, or the ability to obtain within 12-months from time of appointment.
ADDITIONAL REQUIREMENT
Possession and maintenance of a valid California Drivers’ License. Individuals who do not meet this requirement due to a disability will be reviewed on a case-by-case basis.
TYPICAL WORKING CONDITIONS
Work is performed in an office and field environment. Incumbent drives on surface streets and may be exposed to traffic and construction hazards, electrical currents, air contaminants, adverse weather conditions, temperature and noise extremes, wetness, humidity, heights, fumes, dusts, odors, toxic or caustic chemicals and vibrations.
TYPICAL PHYSICAL REQUIREMENTS
Requires the mobility to work primarily in an office environment; some outdoor work is required in the inspection of various land use developments, construction sites and public works facilities. Requires the ability to sit at desks for long periods of time and intermittently walk, stand climb, balance, stoop, kneel, crouch, crawl and reach while performing office duties and/or field work; lift and/or move up to 25 pounds occasionally; use hands to finger, handle, feel or operate objects, tools, and controls. Must be able to maintain effective audio-visual discrimination and perception needed for making observations, communicating with others, reading, and writing, and operating office equipment. Must be able to use a telephone to communicate verbally and a keyboard to communicate through written means, to review information and enter/retrieve data, to see and read characters on a computer screen.
Formatted: Font: (Default) Arial
Commented [MW1]: I removed this because none of
our other job descriptions have it.
218
Item 8.
Council Approved:
This class specification lists the major duties and requirements of the job and is not all-inclusive. Incumbents may be expected to perform job-related duties other than those contained in this document.
219
Item 8.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: PATRICK PIATT, COMMUNITY DEVELOPMENT DIRECTOR
RE: SUPPORT LETTER FOR SB 1216 (CABALDON) – HOUSING
LEADERSHIP DESIGNATION PROGRAM
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider approving of a letter of support for SB 1216 (Cabaldon), which establishes a Housing Leadership Designation Program to recognize jurisdictions that demonstrate strong housing production outcomes and provides associated regulatory flexibility.
DISCUSSION
SB 1216 proposes a performance-based framework that aligns State housing objectives with demonstrated local outcomes. The legislation would allow jurisdictions that successfully deliver housing units to receive increased regulatory flexibility, reducing procedural barriers and accelerating future housing production.
The City of Oroville has demonstrated measurable success in housing delivery, including exceeding its Regional Housing Needs Allocation for affordable housing and actively facilitating additional residential development. The City has also prioritized middle-income housing, securing developer commitments for approximately 250 single-family homes.
Supporting SB 1216 is consistent with the City’s ongoing efforts to:
Increase housing supply across income levels
Streamline permitting and development processes
Align local performance with State housing goals
The proposed legislation reinforces a results-oriented approach and provides incentives for jurisdictions that are effectively delivering housing rather than solely meeting procedural benchmarks.
220
Item 9.
FISCAL IMPACT
There is no direct fiscal impact associated with approving the letter of support.
ACTION REQUESTED -
APPROVE THE LETTER OF SUPPORT FOR SB 1216 (CABALDON); AND
AUTHORIZE THE MAYOR TO SIGN AND SUBMIT THE LETTER THROUGH THE STATE’S POSITION LETTER PORTAL.
ATTACHMENTS
Letter of Support – SB 1216 (Cabaldon).
221
Item 9.
City of Oroville
City Council
1735 Montgomery Street
Oroville, CA 95965-4897
(530) 538-2436 FAX (530) 538-2468
www.cityoforoville.org
SUPPORT LETTER SB 1216 (Cabaldon)
Letters must be submitted on the Position Letter Portal. For information on how to submit a position letter please see the directions here: Advocacy Reference Guide.
April 21, 2026
The Honorable Jesse Arreguín
Chair, Senate Housing Committee
1021 O Street, Suite 3330
Sacramento, CA 95814
RE: Support for SB 1216 (Cabaldon): Planning and Zoning Law, Housing Leadership Designation.
On behalf of the City of Oroville, I write to express our support for SB 1216 (Cabaldon), which establishes a Housing Leadership Designation Program to recognize and reward jurisdictions that demonstrate exceptional housing production outcomes with meaningful regulatory flexibility.
We support SB 1216 because it advances a practical, outcomes-based framework that aligns state objectives with local implementation. For too long, California's housing laws have treated all jurisdictions the same, rewarding compliance on paper while paying little attention to whether homes are actually getting built. SB 1216 changes that by distinguishing jurisdictions that are delivering real results and giving them the trust and discretion they have earned.
The City of Oroville has been proactive in achieving our housing goals. We have exceeded our Regional Housing Needs Assessment goal for affordable housing by approximately 700 units, with additional developments being attracted. We have worked diligently to recruit housing for middle-income households and have succeeded in attracting a developer who has committed to developing approximately 250 single-family homes within that range.
SB 1216's performance-based approach is particularly meaningful to us because it provides an incentive structure that reinforces what effective jurisdictions are already working to accomplish: increasing housing supply while maintaining strong planning standards and community outcomes. By tying regulatory flexibility directly to demonstrated production, the bill creates a constructive pathway for local governments to reduce friction and direct resources toward housing delivery.
David Pittman
Mayor
222
Item 9.
For these reasons, the City of Oroville is pleased to support SB 1216. Thank you for your leadership in advancing solutions that recognize performance, encourage housing production, and strengthen the partnership between the State and local jurisdictions.
Sincerely,
David Pittman
Mayor
223
Item 9.
CODE ENFORCEMENT DIVISION
MARCH 2026 MONTHLY REPORT
CODE ENFORCEMENT ACTIVITIES
Violations Resolved 265
Proactive Cases Opened 100
Reactive Cases Opened 37
Total Cases Closed 142
Voluntarily Closed 81
Forced Closed 61
Inspections Performed 361
Code Enforcement Update:
See attached Comcate Reports. In March Code Enforcement started their DOJ Grant tobacco inspections of all applicable retail stores in the Ctiy Limits. A total of 36 inspections were performed. Code Enforcement located 7 stores in violation of selling flavored tobacco, signage violations, and licensing issues. Some locations had hidden compartments near the point of sale that contained packs of menthol cigarettes.
Housing Navigation Update:
Housing Navigator Dulce Sanchez has worked daily in the field with Code Enforcement. Dulce. She entered 11 people into the HMIS system. Dulce remains focused on her duties. She also assisted Code Enforcement on 4 subject transportations to the Am Trak station, Chico and multiple subjects to the Oroville Rescue Mission.
Safeway Home Program Update:
In the month of March (2) two people were reunited with services and family to the following circumstances and locations:
224
Item 10.
Kellie was homeless in Oroville for about a month. Code Enforcement located a sister in Oklahoma, who agreed to provide housing for Kellie.
Kellie was bused to Oklahoma.
Angela has been unhoused in Oroville for about five years. Code Enforcement located her son who was looking for Angela. They were reconnected and Angela was bused to Reno.
City Works:
City Works continued their normal daily cleanup of our city. Assisting in the abatement of camps, removing shopping carts, and abating trash dumped around our city. City Works assisted Public Works by manicuring vegetation around Hewitt Park, the downtown, trimming overgrown grass along the levy from the Convention Center to the Chinese Temple and Centinel Park.
City Works assisted Code Enforcement in the removal of 27 illegal encampments, 4 illegal dumps, and the raising of trees behind the Southside Community Center. To date 112 camps have been abated since December 2025.
City Works focused a lot of attention on the overpasses at Oro Dam/Hwy 70 and Montgomery/Hwy 70. They worked with police to get subjects moved along. City Works and Code Enforcement conducted multiple camp sweeps along the river from the Nature Center to Bedrock. 225
Item 10.
226
Item 10.
227
Item 10.
228
Item 10.
229
Item 10.
230
Item 10.
231
Item 10.
232
Item 10.
233
Item 10.
234
Item 10.
235
Item 10.
236
Item 10.
237
Item 10.
238
Item 10.
239
Item 10.
April 07, 2026~4:00 PM Oroville City Council Meeting Minutes Page 1 of 7
OROVILLE CITY COUNCIL
Council Chambers
1735 Montgomery Street
Oroville, CA. 95965
April 07, 2026
REGULAR MEETING
MINUTES
CALL TO ORDER / ROLL CALL
Council Members: Chuck Reynolds, Scott Thomson, Tracy Johnstone, Janet Goodson (absent), Shawn Webber, Vice Mayor Eric Smith, Mayor David Pittman
CLOSED SESSION
The City Council held a Closed Session on the following:
1. Pursuant to Government Code section 54956.9(d)(2), the Council met with the City Administrator and City Attorney regarding potential exposure to litigation –Three Cases.
2. The City Council met with the City Administrator and City Attorney for Conference With Real Property Negotiator pursuant to Gov. Code § 54956.8:
Assessor’s Parcel Numbers: 030-260-039
Agency Negotiator: Brian Ring, City Administrator
Negotiating Parties: County of Butte
Under Negotiation: Price and terms
OPEN SESSION
1. Announcement from Closed Session – No reportable action taken; direction given to staff.
2. Pledge of Allegiance – Led by City Administrator Brian Ring.
3. Corrections/Changes to the Agenda – None.
4. Recusals – Item # 6: Vice Mayor Eric Smith recused. Item # 7: Council Member Thomson recused.
5. Adoption of Agenda
Motioned by: Council Member Johnstone Seconded by: Council Member Webber AYES: Council Member(s) Reynolds, Thomson, Johnstone, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
ABSTAINED: None
ABSENT: Council Member Goodson
240
Item 10.
April 07, 2026~4:00 PM Oroville City Council Meeting Minutes Page 2 of 7
PRESENTATIONS AND PROCLAMATIONS
None this meeting.
PUBLIC COMMUNICATION – HEARING OF NON-AGENDA ITEMS
The following member(s) of the public submitted public comment on this item: Rhonda Magnusson, Todd Bang, Brenda Payne, Loraine Noldan, Diane Brown, Elaine Brown, Shane Gower, Natalie Sheard (electronic) and The CameraMan.
REPORTS / DISCUSSIONS
1. Council Announcements and Reports
Council Member Webber: Reminded the public about the OCDC meeting happening on April 13th at 5:30PM at the Oroville State Theatre. He thanked Tim Kaber, Director of Public Works for his work on Hewitt Park and gave praise to the Wildflower Festival stating it was a great event put on by Feather River Parks and Recreation.
Vice Mayor Smith: Big Boy Train from the Union Pacific Railroad will be stopping in Oroville on April 9th at the Depot Park. Feather Fiesta Kickoff is happening May 2, 2026.
Mayor Pittman: Truss service is moving forward with the Butte County Association of Governments for a transport service from Chico/Oroville to the Sacramento area.
2. Administration Reports
Jason Wines, Chief of Police: Hewitt Park has been experiencing some problems from those not following the rules. There will be a zero-tolerance policy moving forward. He gave kudos to those who are following the rules.
Tim Kaber, Director of Public Works: Montgomery roundabout closes at 9PM and traffic will be diverted. Highway 162 will begin on May 5th, traffic will be rerouted at night. High and Myers Streets will be closed for the Big Boy train to come through on April 9th.
Patrick Piatt, Director of Community Development: Health Services Overlay discussion will be coming to the Planning Commission later this month as well as the concept of an Entertainment Zone in the downtown area.
Ron Belser, Director of Code Enforcement: Provided Code statistics update (attached to these minutes).
Chris Tenns, Fire Chief: Gave a presentation on his trip to Wisconsin to view the Fire Engine being put together for the City of Oroville. Measure U funds were used for the purchase of this engine.
Brian Ring, City Administrator: Notified Council that PRA numbers have increased substantially and it’s getting more difficult for staff to address them in a timely manner. 241
Item 10.
April 07, 2026~4:00 PM Oroville City Council Meeting Minutes Page 3 of 7
CONSENT CALENDAR
Consent calendar items 1 – 4 were adopted in one action by the Council. Items that are removed will be discussed and voted on immediately after adoption of consent calendar items.
Motioned by: Council Member Johnstone Seconded by: Vice Mayor Smith AYES: Council Member(s) Reynolds, Thomson, Johnstone, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
ABSTAINED: None
ABSENT: Council Member Goodson
1. UPDATED JOB TITLE AND SALARY SCHEDULE FOR THE GIS SPECIALIST TO GIS
ANALYST II
The City Council approved updates to the job title and salary schedule for the former GIS Specialist position, changing it to GIS Analyst II.
2. UPDATED JOB DESCRIPTION AND SALARY SCHEDULE FOR TRAFFIC SIGNAL
TECH/ELECTRICIAN TO ELECTRICAL MAINTENANCE SUPERVISOR
The City Council approved updates to the job description and salary schedules for the Electrical Maintenance Supervisor position.
3. ACCEPT THE HOME INVESTMENT PARTNERSHIP GRANT STANDARD AGREEMENT 23- HOME-16207, FIRST TIME HOMEBUYER PROGRAM
The City Council accepted the 2023 HOME Investment Partnership Grant (HOME) allocation, Agreement No. 23-HOME 16207, in the amount of $500,000 for the First Time Homebuyer Program and to establish a budget for general administration, program activities and activity delivery and approved a budget adjustment as indicated in the staff report.
4. APPROVAL OF MARCH 17, 2026 CITY COUNCIL REGULAR MEETING MINUTES The City Council approved the March 17, 2026 City Council regular meeting minutes and authorized the Mayor to sign.
242
Item 10.
April 07, 2026~4:00 PM Oroville City Council Meeting Minutes Page 4 of 7
REGULAR BUSINESS
5. NEW PUBLIC FUNDS MONEY MARKET ACCOUNT
The City Council approved a change in bank investment accounts from Local Agency Investment Fund (LAIF), to a Public Funds Money Market account at Golden Valley bank by the following vote:
Motioned by: Council Member Johnstone Seconded by: Council Member Webber AYES: Council Member(s) Reynolds, Johnstone, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
RECUSED: Council Member Thomson
ABSENT: Council Member Goodson
6. STREET CLOSURE PROCEDURES
The following member(s) of the public submitted public comment on this item: Cindy Daniluke, Josh McQuarrie, Gina Garcia, John Zilich, Brian Wong, Dean Hill Jr., Natalie Sheard and Rori Summers.
Vice Mayor Smith recused himself from this item and it’s discussion.
The City Council discussed potential alternatives for safely securing streets for various public events. Staff were directed to come up with a training program for representatives from each of the non-profit agencies to complete with the potential for a designated traffic crew.
7. ANNEXATION FEASIBILITY STUDY UPDATE AND PROPOSED ANNEXATION OF THE
LINCOLN OPHIR STUDY AREA
The City Council received an update on the feasibility study conducted on three potential areas within the County and provided direction to staff – including authorizing staff to pursue annexation of the Lincoln Ophir Annexation Area, as tentatively defined. This was done by general consensus.
243
Item 10.
April 07, 2026~4:00 PM Oroville City Council Meeting Minutes Page 5 of 7
8. AFFORDABLE HOUSING AND SUSTAINABLE COMMUNITIES (AHSC) GRANT
APPLICATION FOR NELSON POINT APARTMENTS
The City Council approved a letter of support for the application of an Affordable Housing and Sustainable Communities (AHSC) grant application for the development of Nelson Point Apartments by the following vote:
Motioned by: Council Member Johnstone Seconded by: Council Member Thomson AYES: Council Member(s) Reynolds, Thomson, Johnstone, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
RECUSED: None.
ABSENT: Council Member Goodson
9. ELECTED OFFICIALS’ TRANSPARENCY AND ACCOUNTABILITY ORDINANCE The City Council directed staff to bring back the transparency and accountability ordinance for elected officials after making Council directed changes by the following vote:
Motioned by: Council Member Reynolds Seconded by: Council Member Thomson AYES: Council Member(s) Reynolds, Thomson, Johnstone, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
RECUSED: None
ABSENT: Council Member Goodson
10. AGREEMENT WITH NEWGEN STRAGEGY SOLUTIONS TO CONDUCT A PRELIMINARY
POWER SUPPLY FEASIBILITY ANALYSIS
The following member(s) of the public submitted public comment on this item: Brenda Narayan and Brian Wong.
The City Council approved an agreement with NewGen Strategy Solutions for a preliminary power supply feasibility analysis in an amount not-to-exceed $40,000.00 by the following vote:
Motioned by: Council Member Webber Seconded by: Vice Mayor Smith AYES: Council Member(s) Reynolds, Thomson, Johnstone, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
RECUSED: None
ABSENT: Council Member Goodson
244
Item 10.
April 07, 2026~4:00 PM Oroville City Council Meeting Minutes Page 6 of 7
11. ADDITIONAL ROAD FUNDING FOR FISCAL YEAR 2025/26
This item was tabled and directed to be brought back at a later date.
12. SELECTION OF THE 2026 SAMUEL J. NORRIS AWARD FOR EXCELLENCE RECIPIENT The City Council selected a recipient for the 2026 Samuel J. Norris Award for Excellence. This selection will be announced at the Annual State of the City event on April 28th, 2026 at 5:30 PM at the Oroville State Theatre
PUBLIC HEARINGS
13. 5:00PM - FIRST READING OF ORDINANCE NO. 1895 WITH AD HOC CITIZEN BUSINESS
ADVOCACY COMMITTEE RECOMMENDATIONS REGARDING THE STREAMLINING OF
CERTAIN BUSINESS LICENSE AND PLANNING PERMITS TO REDUCE THE COST AND
PROCESSING TIME FOR APPLICANTS
Public hearing opened at 5:28PM and was closed at 5:39PM.
The following member(s) of the public submitted public comment on this item: Marsha Henderson and Natalie Sheard.
The City Council conducted a public hearing and approved the Zoning Change recommendations of the Citizen Ad Hoc Business Advocacy Committee as approved by the Planning Commission.
This item will be returned at the next meeting for adoption. This was done by the following vote:
Motioned by: Council Member Johnstone Seconded by: Council Member Webber AYES: Council Member(s) Reynolds, Thomson, Johnstone, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
RECUSED: None
ABSENT: Council Member Goodson
PUBLIC COMMUNICATION – HEARING OF NON-AGENDA ITEMS
None received.
FUTURE AGENDA ITEMS / CORRESPONDENCE
1. Future Agenda Items
2. Correspondence
i. Open Letter For The Record - Doug Dirks
ii. Jeff McClure Public Comment/Correspondence Received March 23, 2026 iii. OCESD-Public Hearing Notice-Implementation Proposed Developer Fees 245
Item 10.
April 07, 2026~4:00 PM Oroville City Council Meeting Minutes Page 7 of 7
ADJOURN THE MEETING
The meeting was adjourned at 8:24PM.
__________________________________ ___________________________________ Kayla Reaster, Assistant City Clerk David Pittman, Mayor 246
Item 10.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR AND COUNCIL MEMBERS
FROM: TIM KABER – DIRECTOR OF PUBLIC WORKS
RE: NORTON STREET REHABILITATION PROJECT UPDATE
DATE: APRIL 21, 2026
SUMMARY
The City Council shall receive an update on the Norton Street Rehabilitation project and options for traffic flow.
DISCUSSION
The Norton Street rehabilitation project is currently in design, with construction anticipated to begin in early Fall 2026. The project limits are Montgomery Street to Bridge Street.
Improvements include pavement reconstruction, drainage improvements, road widening, on street parking, curb, gutter, and ADA curb ramp compliance.
This area has significant drainage problems that will be corrected by this project via curb and gutter and underground storm drain facilities.
The City Right of Way on Norton Street is 32 feet wide.
The traveled path must be a minimum of 20 feet wide for emergency services access.
There is currently parking available on both sides of the street.
There are minimal sidewalks in this area.
Current design provides a 10-foot travel lane and 6-foot parking strip on both sides of the street.
Parking would straddle the curb and gutter, with car wheels on a 42-inch-wide decomposed granite surface.
FISCAL IMPACT
There is no fiscal impact. Funds have previously been allocated for the design and construction project.
ACTION REQUESTED -
PROVIDE STAFF DIRECTION ON NORTON STREET TRAFFIC FLOW AND PARKING OPTIONS.
247
Item 11.
ATTACHMENTS:
Norton Street Presentation
248
Item 11.
Norton Street Rehabilitation
Project Update
Tuesday, April 21, 2026
Oroville City Council
Public Works
1 249
Item 11.
Recommended Motion
• Provide Direction to Staff
2 250
Item 11.
Norton Street Project Limits
3 251
Item 11.
Current Street Congestion
4 252
Item 11.
Current Street Layout
• 32 foot wide ROW
• 2-Way traffic
• 20 foot wide pavement
• No curb/gutter
• No drainage system
• Sheet flow across street
• Minimal sidewalks in area
• Sections at North and South ends only
5 253
Item 11.
New Street Layout
• 32 foot wide ROW
• 20 foot wide travelled lane (minimum)
• 25 foot wide pavement
• Curb/Gutter
• Storm Drain inlets
• Culverts
• 42 inch wide decomposed granite walkways
6 254
Item 11.
Traffic Flow Discussion
• One way
• Traffic flows north to south
• Improves traffic safety at Montgomery end
• Two-way
• Prohibit parking on one side of street?
• Tight confines on road – current situation
7 255
Item 11.
Action Requested
• Provide Direction to Staff
8 256
Item 11.
Questions?
9 257
Item 11.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: PATRICK PIATT, COMMUNITY DEVELOPMENT DIRECTOR
RE: RESOLUTION ACKNOWLEDGING VESTED RIGHTS OF PACIFIC
COAST PRODUCERS AS LEGALLY NON-CONFORMING
DATE: APRIL 21, 2026
SUMMARY
At the request of Pacific Coast Producers (PCP), the Council shall consider passing Resolution No. 9453 acknowledging the vested rights PCP has to legally continue operations as a legal non-conforming business.
DISCUSSION
PCP has operated its Oroville facility for several decades, establishing itself as a key component of the City’s industrial base and agricultural economy. The facility predates the City’s 2007 rezoning of the area to MXD, which was implemented broadly to provide flexibility for future mixed-use development opportunities.
Legal Nonconforming Status and Vested Rights
Under the Oroville Municipal Code, a legally established use that predates a zoning change may continue to operate as a legal nonconforming use, provided it is not discontinued beyond the allowable period (typically two years). PCP has maintained continuous operation and has not triggered any discontinuance provisions.
Additionally, under California law, vested rights attach to lawful uses that were established prior to regulatory changes. These rights protect the continuation of such uses, even when zoning designations evolve over time.
The City’s MXD zoning framework was intentionally designed to allow for a mix of uses while preserving existing lawful operations. The rezoning was not intended to extinguish or phase out established industrial uses such as PCP.
FISCAL IMPACT
There is no direct fiscal impact associated with this action. 258
Item 12.
ACTION REQUESTED -
ADOPT RESOLUTION NO. 9453 MEMORIALIZING THE VESTED RIGHTS OF PACIFIC
COAST PRODUCERS TO CONTINUE OPERATIONS AT ITS CURRENT LOCATION AS A
LEGAL NONCONFORMING USE CONSISTENT WITH APPLICABLE PROVISIONS OF THE OROVILLE MUNICIPAL CODE AND CALIFORNIA LAW.
ATTACHMENTS
1. Resolution No. 9453 Recognizing Vested Rights of Pacific Coast Producers
2. PCP request for City Council Action
3. Excerpts from Oroville Municipal Code – Nonconforming Uses 259
Item 12.
CITY OF OROVILLE
RESOLUTION NO. 9453
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OROVILLE
RECOGNIZING AND MEMORIALIZING THE VESTED RIGHTS AND LEGAL
NONCONFORMING USE STATUS OF PACIFIC COAST PRODUCERS
WHEREAS, Pacific Coast Producers (PCP) has requested the Council pass a resolution memorializing the vested rights PCP has to legally continue operations as a legal non-conforming business; and
WHEREAS, Pacific Coast Producers (PCP) operates a fruit processing and canning facility within the City of Oroville that has been in continuous operation since 1971; and WHEREAS, PCP’s facility is located at 1601 Mitchell Avenue comprised of APN 035- 450-18, 035-450-17, 035-450-11, and 035-250-74.
WHEREAS, PCP’s operations were lawfully established under the zoning regulations in effect at the time of its original development and operation; and WHEREAS, in or about 2007, the City of Oroville adopted zoning changes that redesignated the subject property and surrounding area to Mixed-Use Development (MXD); and
WHEREAS, as a result of this zoning change, PCP’s existing use became classified as a legal nonconforming use under the Oroville Municipal Code; and WHEREAS, the Oroville Municipal Code permits the continued operation of legal nonconforming uses, provided such uses are not discontinued for a period exceeding the time specified in the Code; and
WHEREAS, PCP has maintained continuous operation of its facility and has not discontinued its use in a manner that would result in loss of its legal nonconforming status; and
WHEREAS, under California law, property owners may acquire vested rights to continue a lawful use that was established prior to a change in zoning regulations; and WHEREAS, the City Council finds that PCP possesses vested rights to continue its existing operations at its current location; and
WHEREAS, the City Council has been requested to provide clarity and certainty regarding the legal status of PCP’s operations and to memorialize its vested rights and legal nonconforming use status; and
WHEREAS, this action does not grant new land use entitlements, expand the scope or intensity of PCP’s operations, or waive any applicable health, safety, or environmental regulations; and
260
Item 12.
WHEREAS, this action is an interpretation and confirmation of existing law and is not a “project” subject to the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15060(c)(2) and 15061(b)(3).
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Oroville as follows:
Section 1. Recitals. The foregoing recitals are true and correct and are incorporated herein by this reference.
Section 2. Recognition of Legal Nonconforming Use. The City Council hereby recognizes that Pacific Coast Producers’ fruit processing and canning operations constitute a lawful legal nonconforming use under the Oroville Municipal Code.
Section 3. Recognition of Vested Rights. The City Council hereby finds and confirms that Pacific Coast Producers possesses vested rights under California law to continue its existing operations at its current location, subject to applicable laws and regulations.
Section 4. Continuation of Operations. Pacific Coast Producers may continue its existing operations, described in section 5 below, consistent with its legal nonconforming use status, provided that such operations are not discontinued or abandoned in a manner that would result in the loss of such status under the Oroville Municipal Code.
Section 5. Pacific Coast Producers’ operations involve the manufacturing and preparation of various food items, employing processes such as canning, extracting, fermenting, distilling, pickling, freezing, baking, drying, smoking, grinding, cutting, mixing, coating, stuffing, packing, bottling, packaging, and other treatments or preservation methods for human consumption.
As part of its processing activities, the Facility incorporates warehousing and outdoor storage, encompassing items like pallets, bins, trailers, crates, and construction materials/equipment related to the processes.
Additionally, the Facility includes ancillary office space and necessitates significant semitruck trips for transporting raw ingredients, including seasonal fruit receiving during harvest periods, as well as packaging/canning materials and manufactured food items.
Lastly, the Facility, as part of its fundamental operations, must continuously undertake equipment, building, process, and product modernization to remain competitive within the ever-evolving marketplace.
Section 6. No Expansion of Rights. Nothing in this Resolution shall be construed to authorize the expansion, intensification, or alteration of Pacific Coast Producers’ operations beyond what is otherwise permitted by applicable law.
Section 7. CEQA Determination. The City Council finds that this Resolution is not a project subject to CEQA pursuant to CEQA Guidelines Sections 15060(c)(2) and 15061(b)(3), as it constitutes a clarification and interpretation of existing law. 261
Item 12.
Section 8. Effective Date. This Resolution shall take effect immediately upon its adoption.
PASSED AND ADOPTED by the City Council of the City of Oroville at a regular meeting held on April 21, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________________
DAVID PITTMAN, MAYOR
APPROVED AS TO FORM: ATTEST:
_______________________________ ________________________________ DAVID RITCHIE, ASST. CITY ATTORNEY KAYLA REASTER, ASSIST CITY CLERK 262
Item 12.
263
Item 12.
264
Item 12.
265
Item 12.
266
Item 12.
267
Item 12.
268
Item 12.
269
Item 12.
270
Item 12.
271
Item 12.
272
Item 12.
273
Item 12.
274
Item 12.
275
Item 12.
276
Item 12.
277
Item 12.
278
Item 12.
279
Item 12.
280
Item 12.
281
Item 12.
282
Item 12.
283
Item 12.
284
Item 12.
285
Item 12.
286
Item 12.
287
Item 12.
288
Item 12.
289
Item 12.
290
Item 12.
291
Item 12.
292
Item 12.
293
Item 12.
294
Item 12.
295
Item 12.
296
Item 12.
297
Item 12.
298
Item 12.
299
Item 12.
300
Item 12.
301
Item 12.
302
Item 12.
303
Item 12.
304
Item 12.
305
Item 12.
306
Item 12.
307
Item 12.
308
Item 12.
309
Item 12.
310
Item 12.
311
Item 12.
312
Item 12.
313
Item 12.
314
Item 12.
315
Item 12.
316
Item 12.
317
Item 12.
318
Item 12.
319
Item 12.
320
Item 12.
321
Item 12.
322
Item 12.
323
Item 12.
324
Item 12.
Attachment 4
Oroville Municipal Code – Nonconforming Uses (Summary)
Section 17.08.140 – Nonconforming Uses:
A lawful use existing at the time of adoption or amendment of zoning regulations may continue.
Such uses are considered legal nonconforming uses.
A nonconforming use may not be reestablished if discontinued for a period exceeding two years.
Maintenance and repair of structures associated with nonconforming uses is generally permitted.
Expansion or intensification may be subject to additional review and approval.
Note: This is a summary. Final attachment should include full code text if required. 325
Item 12.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: CHRIS TENNS, FIRE CHIEF
RE: FIRE DEPARTMENT COST RECOVERY – MANAGING SERVICE
DEMAND
DATE: APRIL 21, 2026
SUMMARY
The City Council shall receive information and provide direction on a proposed ordinance to establish a Fire Department cost recovery program.
DISCUSSION
The Oroville Fire Department continues to see a high demand for service, including a growing number of non-emergency and preventable calls. While we are always ready to respond when help is needed, these types of calls can take time and resources away from true emergencies.
This proposed ordinance is intended to allow the city to recover costs in certain situations, such as repeated false alarms, non-emergency service requests, or incidents caused by negligence or violations. The goal is not to generate revenue, but to encourage responsible use of emergency services and help offset costs when those services are used inappropriately.
It is important to emphasize that we will not bill for true emergencies. We want the public to continue to call 911 whenever they have a real emergency, we are here to help, and that will not change. The ordinance includes clear exemptions to ensure that anyone acting in good faith during an emergency is not charged.
The Fire Chief, or designee, would have the ability to determine when billing is appropriate and may waive fees when circumstances warrant. Fees would be set through the City’s Master Fee Schedule.
FISCAL IMPACT
None
ACTION REQUESTED -
PROVIDE FEEDBACK AND DIRECTION ON THE PROPOSED ORDINANCE; AND DIRECT STAFF TO RETURN WITH LANGUAGE READY FOR A PUBLIC HEARING.
ATTACHMENTS
Draft Ordinance
326
Item 13.
327
Item 13.
ORDINANCE NO. 1897
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
OROVILLE ADDING CHAPTER 10.28 TO TITLE 10 OF THE
OROVILLE MUNICIPAL CODE RELATING TO FIRE DEPARTMENT
COST RECOVERY
SECTION 1. Findings and Purpose
The City Council of the City of Oroville finds and declares:
A. The Oroville Fire Department provides essential emergency and life safety services to protect the public health, safety, and welfare.
B. The costs associated with certain Fire Department responses are attributable to negligent, unlawful, excessive, avoidable, discretionary, or non-emergency uses of emergency services.
C. Repeated non-emergency or preventable service requests place an undue burden on limited taxpayer-funded resources, personnel, and equipment.
D. The City Council desires to authorize cost recovery in appropriate circumstances while ensuring that no person is discouraged from requesting emergency assistance during a bona fide life-threatening emergency.
E. This Chapter is intended to supplement existing cost recovery authority, including Chapter 10.24 of this Code.
328
Item 13.
Chapter 10.28
FIRE DEPARTMENT COST RECOVERY
10.28.010 – Definitions
A. “Actual Cost” means the full direct and indirect cost of providing Fire Department services, including but not limited to personnel wages and benefits, apparatus, fuel, maintenance, equipment use, materials, supplies, administrative overhead, dispatch services, and any contracted services, as established by the City’s Master Fee Schedule.
B. “Billable Incident” means a Fire Department response determined by the Fire Chief or designee to qualify for cost recovery under this Chapter.
C. “Responsible Party” means any person, business, corporation, property owner, occupant, or legal entity whose actions, negligence, omissions, violations, or service requests caused or necessitated a Billable Incident.
10.28.020 – Authority to Recover Costs
A. The City is authorized to recover the Actual Cost of Billable Incidents.
B. The Fire Chief, or designee, shall have sole administrative discretion to determine:
1. Whether an incident constitutes a Billable Incident;
2. Whether billing is appropriate under the circumstances;
3. The Responsible Party;
329
Item 13.
4. Whether full or partial cost recovery shall be pursued;
5. Whether billing shall be waived in the interest of justice or public welfare.
C. The Fire Chief may establish written administrative policies and criteria for implementation of this Chapter.
10.28.030 – Billable Incidents
Billable Incidents may include, but are not limited to:
A. False and Preventable Alarms
1. Excessive false fire alarms beyond thresholds established in the Master Fee Schedule.
2. Fire alarm activations caused by system malfunction due to lack of maintenance.
3. Alarm activations resulting from construction activity without proper notification.
B. Non-Emergency Public Assists
1. Lift assists or “help-up” calls where no acute medical emergency exists.
2. Repeated non-emergency assistance requests by a private business, facility, or property owner.
3. Welfare checks or service calls where no emergency condition is present.
C. Negligence or Unlawful Conduct
330
Item 13.
1. Motor vehicle collisions involving negligent or unlawful operation, including DUI.
2. Hazardous materials releases caused by negligence or regulatory violations.
3. Unauthorized burning or fire code violations requiring response.
4. Fireworks violations requiring response.
D. Specialized or Resource-Intensive Responses
1. Technical rescues (confined space, trench, rope rescue) where caused by negligent acts.
2. Water rescue or swift water response due to reckless behavior.
3. Illegal campfires or warming fires requiring suppression.
4. Fire investigations caused by negligent or unlawful activity.
E. Business and Commercial Activity Responses
1. Repeated service requests by private businesses for non-emergency assistance.
2. Fire watch services.
3. Standby services for events without required permits.
4. Failure to maintain required fire protection systems.
F. Other Discretionary Responses
331
Item 13.
Any Fire Department response which the Fire Chief determines:
1. Was not a bona fide, unforeseeable life-threatening emergency;
2. Was avoidable, excessive, or due to misuse of emergency services; or
3. Is otherwise appropriate for cost recovery under applicable law.
10.28.040 – Exemptions
This Chapter shall not apply to:
A. Bona fide life-threatening medical emergencies;
B. Good faith emergency calls where immediate threat to life or property reasonably appeared to exist;
C. Mutual aid responses unless otherwise authorized by agreement; D. Incidents where cost recovery is prohibited by state or federal law.
10.28.050 – Fees and Master Fee Schedule
A. Charges shall be imposed consistent with the City of Oroville Master Fee Schedule as adopted and amended by City Council resolution.
B. The City Council may establish, revise, or update cost recovery rates by resolution without amendment to this Chapter.
10.28.060 – Billing and Collection
332
Item 13.
A. The City may invoice the Responsible Party or their insurer.
B. Payment shall be due within thirty (30) days of invoice.
C. Unpaid amounts constitute a debt owed to the City.
D. The City may pursue all lawful collection remedies.
10.28.070 – Appeals
A Responsible Party may file a written appeal within fifteen (15) calendar days of the invoice date. Appeals shall be reviewed pursuant to administrative procedures established by the City Administrator or designee.
SECTION 2 – Severability
If any section, subsection, sentence, clause, or phrase is held invalid, the remaining portions shall remain in effect.
333
Item 13.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: JASON WINES, CHIEF OF POLICE
RE: OROVILLE POLICE DEPARTMENT RECOMMENDATIONS FOR
INCREASED PRESENCE IN PARKS
DATE: APRIL 21, 2026
SUMMARY
The City Council shall hear recommendations from the Police Department in regard to increasing presence at City parks.
DISCUSSION
After review options to increase Oroville Police presence in the Oroville Parks, the police department makes the following requests/ recommendations:
1) One-time purchase of "Mobile Rims" and mobile computers RIMS is the record management system used to record and track calls for service and where all police reports are created. Currently RIMS reports can only be accessed at the police department, requiring officers to return to the department to complete reports. This causes excess mileage and time needed for travel.
Implementing Mobile RIMS will allow officers to access RIMS reports in the field and use specialized laptops to write reports. Officers can go to the various parks within the City to write reports, which will create multi-faceted benefits; 1) Reduce fuel used driving back and forth the Department, 2) Reduce the time it takes to go back and forth to the Department, 3) Be a presence in the parks as both a deterrent and faster response to any issues, 4) Increase proactivity without additional burdens on dispatch resources.
In addition to the one time purchase of Mobile RIMS, the Department would need to purchase computers that are mounted to the vehicles. The laptops cost between $3,500 and $5,000 each, but are built for the rigorous demands of patrol.
Working with Finance, we have identified two accounts that have sufficient funds to purchase Mobile Rims and several computers, without the need to request additional funds. 334
Item 14.
2) Purchase of additional live view cameras
The Department has placed one Flock mobile trailer in Hewitt Park and will be placing two other cameras in the park to increase evidentiary video. We have also installed video monitors in dispatch, and will be installing others in patrol and other areas of the Department to increase monitoring capabilities. We anticipate finding additional funding sources to increase video capability at all parks within the City.
3) The Department immediately implemented extra patrols in parks, focusing immediately on Hewitt Park, but increasing patrols to all parks. We plan to implement a team specific to the Downtown and park districts to include e-bike patrols, foot patrols, ATV patrols and regular patrols.
Staffing for the downtown team will consist of both sworn and non-sworn officers, working in pairs to conduct proactive patrols. The initial team will consist of School Resource Officers through the day, alternating patrols with the needs of the schools. As officer staffing increases, more officers will supplement the Downtown/ Parks unit.
The Department reviewed the potential of using additional overtime hours to maintain a presence in the parks, however we felt that was not sustainable and would offer only limited benefits to our City. We determined the use of Mobile Rims provides the greatest return on investment and does not require ongoing costs.
FISCAL IMPACT
Funds currently identified in Police Department budget to cover the costs identified.
ACTION REQUESTED -
PROVIDE DIRECTION TO STAFF.
ATTACHMENTS
None.
335
Item 14.
CITY OF OROVILLE
STAFF REPORT
TO: MAYOR AND COUNCIL MEMBERS
FROM: TIM KABER – DIRECTOR OF PUBLIC WORKS
RE: AWARD OF CONSTRUCTION (PHASE II); DESIGN-BUILD ENTITY FOR
CORPORATION YARD PROJECT, MULTI-BUILDING REMODEL AND
SITE WORKDESIGN/BUILD PROJECT AT 655 CAL OAK
DATE: APRIL 21, 2026
SUMMARY
The City Council shall consider awarding the construction portion (phase II) of the contract with United Building Contractors, Inc (UBC) of Chico for Design/Build Construction Services on the new City of Oroville Corporation Yard.
DISCUSSION
The City Council received a report on the new Corporation Yard project at the October 7, 2025 meeting. The Phase II proposal was significantly higher than available funds, and direction was provided to Staff to reduce the scope of the project to align with available funding.
The scope of the project has been reduced to exclude the Admin building and site work. The main focus is now the Mechanics building and increased electrical power. Requirements have shifted to the Mechanics shop from the Admin building, such as showers, locker rooms, and laundry. HVAC was changed to evaporative cooling and natural gas heaters that are consistent with the current Corporation Yard.
Changes from proposal submitted October 7, 2025:
Work Element October 7, 2025 Proposal April 16, 2026 Proposal Admin Building $1,735,404.68 Excluded
Mechanics Shop $542,126.38 $1,027,532
Site Work $389,704.77 $90,992
Add Alt #1 Electrical $327,750 $128,825
Add Alt #2 Roll-Up Doors $163,410.50 $180,040
Add Alt #3 Insulation $218,269.15 Excluded ($130,093.74 if desired)
336
Item 15.
Add Alt #4 HVAC $487,219.15 $448,470 (Evap and Gas
heaters)
Add Alt #5 Low Volt Electrical $312,800 Excluded ($113,338.64 if desired)
Add Alt #6 Polished Concrete
Floors
$185,817 Excluded
Add Alt #7 Sliding Motor
Access Gate
$47,863 Excluded ($75,979.45 if
desired)
Add Alt #8 Slurry Seal $69,793.73 Excluded
Add Alt #9 Power for Lifts N/A $24,951
Deductions for structural N/A -$152,824
Total $4,480,158.36 $1,747,985.36
The updated conceptual design plan has been reviewed by Public Works managers and it adequately meets their needs.
The Guaranteed Maximum Price (GMP), with a price of $1,747,985.36, meets the requirements of the City. The GMP will remain the contract price unless additional work is requested by the City.
FISCAL IMPACT
There is no fiscal impact. Funds will come from the previously approved Corp Yard budget.
ACTION REQUESTED -
APPROVE THE CONTRACT WITH UNITED BUILDING CONTRACTORS, INC., AND AUTHORIZE THE MAYOR TO SIGN.
ATTACHMENTS
1. UBC Proposal for construction (Phase II)
2. Contract for Phase II
3. Updated conceptual plans
337
Item 15.
Phone 530.345.8455
Fax 530.345.8885
Lic. 679303
Owner:
Attn:
Oroville Corporation Yard Multi-Building Remodel & Sitework n/a
Scope:
Pricing
Excluded
$1,027,532
$90,992
$1,118,524
$128,825
$180,040
Excluded
$448,470
Excluded
n/a
Excluded
n/a
$24,951
$1,900,809
-$152,824
$1,747,985
Terms
This price is based on prevailing wage rates and work is assumed to be during normal working hours (Monday - Friday) ***Add Alt Price #1 must also be accepted in order to complete the base bid #2 scope City of Oroville
Deduct Alt #1 - Structural Upgrades at Mezzanine per Structural Narrative Option #2 BASE BID TOTAL W/ All ADD ALTS & DEDUCT INCLUDED
United Building Conractors is pleased to submit our price proposal for the renovations at building B and sitework per the bid documents. Additionally, we have included additive alternate pricing for the scopes listed below in the price breakdown section.
P O Box 6039
Chico CA 95927
Proposal Summary
Base Bid #2 - Building B Bathroom and Office Renovations W/ Minimal Sitework Nick Trover
Trover Construction Project Management LLC
Project Title:
Project Number:
Location:
Add Alt #9 - Power to Vehicle Lift & Tire Machines at Shop Area BASE BID TOTAL W/ All ADD ALTS INCLUDED
Oroville, Ca
Description
Price Breakdown
Base Bid #1 - Building A Admin New Addition & Renovations (From Slab Up) Add Alt #4 - New Evap Cooling & Heating Upgrades at Building B Maintenance Shop Area Add Alt #5 - Building B Maintenance Shop Warehouse Electrical & Low Volt Replacement Add Alt #6 - Polished Concrete Floors at Building B Maintenance Shop Area Add Alt #7 - Sliding Motor Access Gate
Add Alt #8 - Type 2 Slurry Seal at Existing Parking Lott Areas in Lieu of Standard Seal Coat Base Bid #3 - New Sitework Upgrades per Plans (Complete Scope per plans)
BASE BID TOTAL
Add Alt #1 - Electrical Service Upgrades & Panel Replacement at Building B Maintenance Shop Add Alt #2 - Overhead Roll Up Door Replacement & Infill at Building B Maintenance Shop Area Add Alt #3 - Exterior Wall Insulation Addition at Building B Maintenance Shop Thank you for the opportunity to provide you with these estimates. If there are any questions, please give us a call.
Thank you,
Edgar Ibarra
United Building Contractors, Inc.
338
Item 15.
4/16/2026
Attachment A
Section Notes Quantity Unit Unit Cost Item Total
General Conditions INCLUDED IN MARK UP SECTION BELOW 1 months $0.00 $0.00 $0.00
Increased: Includes building demo of walls, ceilings, drywall and fixtures; Add walls to be removed; Excludes abatement of Hazardous materials 1 ls $36,489.00 $36,489.00 Added: Includes demolition of the existing plywood sheathing, shelves to access walls, and cutting back the mezzanine wood material 3" - 4" at the Storage rooms in order to complete the structural upgrades 1 ls $35,775.00 $35,775.00 UBC 1 ls $5,500.00 $5,500.00
UBC 1 ls $6,350.00 $6,350.00
Bathroom area only 1 ls $21,340.00 $21,340.00
For new spread footings @ Spread footings 1 ls $7,700.00 $7,700.00 $113,154.00
Patchback @ Existing Building Bathroom 1 ls $15,340.00 $15,340.00 Added: Patchback @ Existing Storage rooms for new footings (assumes 4 new spread footings - each 3'x3'x12" Deep for shearwalls AND three (3) new 8'-6 x 10' x 12" Deep Pad Footings for Lift Stations) 1 ls $36,855.00 $36,855.00 Site Concrete Added: Assumes 4" concrete with rebar at the exterior of the building 1 ls $14,289.00 $14,289.00 Concrete Housekeeping Pads for Evap Coolers Added: Assumes 4" concrete with rebar at the exterior of the building 1 ls $10,890.00 $10,890.00 Added: Assumes to occur at concrete flatwork joints 1 ls $3,784.00 $3,784.00 $81,158.00
1 ls $0.00 $0.00
$0.00
Includes angle supports for casework 1 ls $4,500.00 $4,500.00 1 ls $2,500.00 $2,500.00
$7,000.00
Increased: Assumes new 2x6 stud walls and ceiling joist framing at the building B rooms per plans; Increase due to added blocking for lockers and wall framing for restrooms 1 ls $45,718.00 $45,718.00
Added: Assumes shear wall upgrades per structural narrative including cutting back existing mezzanine framing, replacing exterior sheathing at 3 sides of mezzanine, 6x posts, HDs, blocking, shoring and sill plate washers 1 ls $100,430.00 $100,430.00 Added: Assumes new 4' tall wainscoat at walls of restrooms 126, 127 & 128 1 ls $18,544.00 $18,544.00 1 ls $12,500.00 $12,500.00
Added: Assumes lockers and cabinets at room 125, 124 and small office nextdoor 1 ls $79,425.00 $79,425.00
$256,617.00
Decreased: Assumes walls at infill area only, excludes roof and exterior wall insulation at maintenance shop area; See add alt pricing 1 ls $5,974.00 $5,974.00 Assumes at door frames and joint transitions 1 ls $3,926.00 $3,926.00 Excluded - not shown in plans 1 ls $0.00 $0.00
Excluded - not shown in plans 1 ls $0.00 $0.00
$9,900.00
Increased: Assumes eight (8) new 3070 - HM Doors, Frames & standardware hardware 1 ls $30,920.00 $30,920.00
Excluded - not shown in plans 1 ls $0.00 $0.00
Assumes five (5) new 24x24 ceiling access doors 1 ls $1,877.00 $1,877.00 $32,797.00
Assumes a moisture vapor barrier at rooms 124, 125, 126, 127, and 128 only 1 ls $14,062.50 $14,062.50 1 ls $11,492.00 $11,492.00
Increased: Assumes new 5/8 drywall at new walls and ceilings, existing exterior walls of new restrooms, Mud & Tool rooms, and Office 124; Increase due to patchback walls for blocking at lockers; Excludes drywall at Storage Rooms 129 - 133 1 ls $29,215.50 $29,215.50
Excludes new drywall at Storage Rooms 129 - 133 walls and ceilings as required to upgrade the structural mezzanine 1 ls $0.00 $0.00
Includes painting the new and existing building interior walls & ceilings at 124, 125, 126, 127, and 128 only; Excludes painting the exposed piping / utility lines throughout the shop area and at Storage rooms 129 - 133 1 ls $11,781.00 $11,781.00 Increased: Assumes a 9' tall wall tile and floor tile at Restroom 126 shower only 1 ls $15,486.00 $15,486.00 Accoustical T Bar Ceilings Assumes new acoustical t bar ceilings at Mud & Tool Room 1 ls $7,837.50 $7,837.50 Assumes new flooring at rooms 124, 125, and side office room only 1 ls $7,207.50 $7,207.50 Epoxy flooring & base at the restrooms 126, 127 and 128 only per plans 1 ls $13,472.00 $13,472.00 Floor Protection & Prep 1 ls $5,800.00 $5,800.00
Trade Damage 1 ls $7,200.00 $7,200.00
Excluded - not shown in plans 1 ls $0.00 $0.00
Excluded - not shown in plans 0 ls $0.00 $0.00
$123,554.00
Assumes one (1) room ID signage at each room, exterior door signage, and restrooms signage 1 ls $4,650.00 $4,650.00
Revision No:
Section Description
Division 1 - General Requirements
United Building Contractors, Inc Job No.
ROM Based off of SD drawings received from design team on 2/20/26 Date:
City of Oroville Corporate Yard - Building B Maintenance Building Office, Restroom Renovations & Sitework: Option 1 - With Site Work and All Add Alt Pricing Items Included per below (Alt #4 Evap Cooling & Heating option included w/ Option #2 Structural Upgrades deduct below) Site Potholing
Concrete Hard Demo @ Bathrooms
Concrete Hard Demo @ Spread Footings
Division 2 Totals
Division 3 - Concrete
SOG Patchback @ Bathrooms
Division 1 Totals
Division 2 - Demolition & Site Investigation
Soft Demo / Building Demo
Soft Demo / Building Demo
Site Utility Locating
Division 5 - Metals
Miscellaneous Steel
Anchor Bolts & Imbeds
Division 5 Totals
Division 6 - Wood & Plastics
Rough Carpentry - New Walls & Ceilings
SOG Patch & New Footings @ New Exterior Shear Wall &
Vehicle Lift Stations
Site Caulking / Expansion Joints
Division 3 Totals
Division 4 - Masonry
n/a
Division 4 Totals
Insulation - Walls & Ceilings
Sealants & Caulking
Roofing Scope - Excluded
Weather Barrier - Excluded
Division 7 Totals
Division 8 - Openings
Rough Carpentry - Structural Upgrades at Mezzanine
FRP Panels
Layout, P&D, Backing, Blocking
Casework & Lockers
Division 6 Totals
Division 7 - Thermal & Moisture Protection
Temp Heating
Drywall - Walls & Ceilings
Drywall - Walls & Ceilings at Storage Rooms - Excluded
Painting - Interior
Wall & Floor Tile at Showers
Flooring - VCT
HM Doors, Frames, & Hardware - 3070 (Single Doors)
Storefront Windows & Glazing - Excluded
Access Doors/Panels
Division 8 Totals
Division 9 - Finishes
Alkalinity Barrier & Testing
Signage & Install - Room ID & Metal Building Signage
Epoxy Flooring & Base
Slip Resistant Polished Concrete
Painting - Exterior (Excluded)
Division 9 Totals
Division 10 - Specialties