Text extracted from the city's file for reading and search. Open the original on oxnardca.api.civicclerk.com. That file is the official record.

Consistent with VCAPCD’s Guidelines, Mitigation Measures AQ-1 is and AQ-2 are required to reduce the project’s ROC and NOX emissions, respectively, from construction equipment.

Page 24 ends

AQ-1 ROC Construction Reduction Measures
Per VCAPCD recommendation, during project construction, the project applicant shall use architectural coatings with ROC contents of 25 g/L or less.

AQ-21 NOX Construction Reduction Measures
Per VCAPCD recommendation, when because project construction emissions would exceed 25 pounds per day for NOX, the following measures shall be implemented:

Page 25 ends

Significance After Mitigation
Implementation of Mitigation Measures AQ-1 and AQ-2 would reduce maximum daily ROC and NOX emissions.

Response 1.4
The commenter concurs with the inclusion of mitigation to require Tier 3 diesel engines for all offroad construction equipment.

This comment is noted, and no changes to the IS-MND are required.

Response 1.5
The commenter suggests using the average daily trip (ADT) rate from the project-specific traffic study rather than the CalEEMod default trip generation rate. The commenter recommends replacing the default CalEEMod ADT input of 403 ADT with the daily ADT indicated in the Traffic Study of 567 trips 5 852
City of Oxnard
2420 Oxnard Boulevard U-Haul Project Responses to Comments on the Draft IS-MND per day. The commenter also recommends separating trips by land use category and considering operational days (Mon-Fri, Sat, Sun) when making corrections.

In response to the comment, the CalEEMod trip rates were updated to reflect the trip data contained in the project-specific Traffic Study. The Traffic Study provided daily ADT for weekdays (Mon-Fri), but not for weekends. Therefore, daily ADT for weekdays was also applied to weekends. This represents a conservative analysis because the proposed commercial land use typically generates more trips on weekdays than weekends.

Table 2 , Operational Emissions in Section 3, Air Quality, on page 24 of the Draft IS-MND has been revised as follows:

Table 2 Operational Emissions (pounds/day)
Pollutant Total Emissions Significance Threshold Significant Impact? ROC 6.26.3 25 No
NOx 1.72.3 25 No
CO 11.916.2 N/A N/A
SO2 <0.1 N/A N/A
PM10 2.53.3 N/A N/A
PM2.5 0.70.9 N/A N/A
Notes: See Appendix A for CalEEMod worksheets. Emission data is pulled from “mitigated” results from the winter season CalEEMod output, which account for compliance with regulations and project design features.

The preceding discussion on page 24 of the Draft IS-MND has been revised as follows:

CalEEMod provides default trip generation rates, which Trip generation rates from the project-specific Traffic Impact Analysis (raSmith 2021) were used to estimate mobile source emissions.

Additionally, revisions have been made to Section 5, Climate Change and Greenhouse Gases, and Section 7, Energy. In Section 5 on pages 38 and 39 of the Draft IS-MND, Table 3 and the preceding discussion have been revised to reflect the updated emissions estimates as follows:

As shown in Table 6, the increase in annual emissions from both construction and operation of the proposed project would total approximately 8761,024 MT of CO2e.

Table 3 Combined Annual Emissions of Greenhouse Gases
Emission Source Annual Emissions (CO2e in metric tons)
Construction 17
Operational
Area <1
Energy 206207
Solid Waste 9798
Mobile 378526
Water 176
Total Operational 8591,007
6 853
City of Oxnard
2420 Oxnard Boulevard U-Haul Project Responses to Comments on the Draft IS-MND Combined Annual GHG Emissions 8761,024
See Appendix A for CalEEMod worksheets. Some number may not add up due to rounding.

In Section 7 on page 47 of the Draft IS-MND, Table 4 and the preceding discussion have been revised to reflect the updated emissions estimates as follows:

According to the CalEEMod calculations, the project would result in 1,119,0181,553,454 annual VMT resulting from the 403567 average daily trips during the week generated by the project during operation (Appendix A). Table 4 shows the estimated total annual fuel consumption of the project using the estimated trip generation and VMT with the assumed vehicle fleet mix (Appendix A). One gallon of gasoline is equivalent to approximately 109,786 Btu (CARB 2015), while one gallon of diesel is equivalent to approximately 127,460 Btu (Schremp 2017).

As shown in Table 4, the project would consume approximately 57,96780,473 gallons of fuel, or 6,5169,046 MMBtu, each year for transportation uses from project operation.

Table 4 Estimated Project Annual Transportation Energy Consumption Land Use1
Percent of
Vehicle
Trips2
Annual Vehicle Miles
Traveled3
Average Fuel
Economy
(miles/gallon)
4 Total Annual Fuel
Consumption
(gallons)
Total Fuel
Consumption
(MMBtu)6
Passenger Cars 60.5 676,793939,545 24.1 28,08338,985 3,0834,280 Light/Medium
Trucks

33.2 371,364515,539 17.6 21,10029,292 2,3163,215
Heavy
Trucks/Other

5.8 64,86190,041 7.5 8,64812,006 1,1021,530
Motorcycles 0.5 6,0018,331 44.05 136189 1521
Total 100.0 1,119,0181,553,454 – 57,96780,473 6,5169,046 1 Vehicle classes provided in CalEEMod do not correspond exactly to vehicle classes in DOT fuel consumption data, except for motorcycles. Therefore, it was assumed that passenger cars correspond to the light-duty, short-base vehicle class, light/medium trucks correspond to the light-duty long-base vehicle class, and heavy trucks/other correspond to the single unit, 2-axle 6-tire or more class. 2 Percent of vehicle trips from Table 4.4 “Fleet Mix” CalEEMod output (see Appendix A). 3 Mitigated annual VMT found in Table 4.2 “Trip Summary Information” in CalEEMod output (see Appendix A). 4,5 National Transportation Statistics: United States Department of Transportation, Bureau of Transportation Statistics, 2021. 6 CaRFG fuel specification of 109,786 Btu/gallon used to identify conversion rate for fuel energy consumption for vehicle classes specified above (see Energy Unit Conversion Sheet in Appendix B).

Notes: Totals may not add up due to rounding.

These revisions do not alter the conclusions of the IS-MND that operation of the proposed project would have a less than significant impact in the Greenhouse Gas and Energy impact areas. 7 854
Appendix F
Mitigation Monitoring and Reporting Program
855
City of Oxnard
2420 Oxnard Boulevard U-Haul Project Mitigation Monitoring and Reporting Program Final Initial Study – Mitigated Negative Declaration 1
Mitigation Monitoring and Reporting Program
CEQA requires that a reporting or monitoring program be adopted for the conditions of project approval that are necessary to mitigate or avoid significant effects on the environment (Public Resources Code 21081.6). This mitigation monitoring and reporting program is intended to track and ensure compliance with adopted mitigation measures during the project implementation phase. For each mitigation measure recommended in the Final Initial Study – Mitigated Negative Declaration (Final IS-MND), specifications are made herein that identify the action required, the monitoring that must occur, and the agency or department responsible for oversight. 856
Mitigation Monitoring and Reporting Program
2 Mitigation Measure/
Condition of Approval Action Required Monitoring Timing Monitoring
Frequency
Responsible
Agency
Compliance Verification
Initial Date Comments
Air Quality
MM-AQ-1- ROC Construction Reduction
Measures
Per VCAPCD recommendation, during project
construction, the project applicant shall use
architectural coatings with ROC contents of 25
g/L or less.

During plan check, confirm that architectural
coatings consistent with VCAPCD
recommendations as described in this
mitigation measure are specified on the
project plans for use during construction of
the proposed project.

Prior to granting building
permits
Once City of
Oxnard
Planning
Division
MM-AQ-2: NOX Construction Reduction
Measures
Per VCAPCD Guidelines, because project
construction emissions would exceed 25
pounds per day for NOX, the following
measures shall be implemented:
▪ Minimize equipment idling time.
▪ Maintain equipment engines in good
condition and in proper tune as per
manufacturers’ specifications.
▪ Lengthen the construction period during
smog season (May through October) to
minimize the number of vehicles and
equipment operating at the same time.
▪ Use alternatively fueled construction
equipment, such as compressed natural gas,
liquefied natural gas, or electric, if feasible.
▪ In addition, per recent VCAPCD guidance on
other projects, project construction shall
use Tier 3 or above construction equipment
for all off-road diesel equipment that has
greater than 50 horsepower. A copy of each
unit’s certified tier specification shall be
provided at the time of mobilization of each
applicable unit of equipment.

Confirm that the actions required under this
mitigation measure are implemented for the
proposed Project.

At beginning of and during
construction
Once at
beginning of,
and
periodically
during,
construction
City of
Oxnard
Planning
Division
857
Mitigation Monitoring and Reporting Program
Final Initial Study – Mitigated Negative Declaration 3
Mitigation Measure/
Condition of Approval Action Required Monitoring Timing Monitoring
Frequency
Responsible
Agency
Compliance Verification
Initial Date Comments
Biological Resources
MM-BIO-1 Nesting Bird Surveys
Nesting bird surveys shall be conducted by a
qualified biologist prior to any construction
activities during bird breeding season from
February 1 through August 31. If no nesting
birds are detected during these surveys, then
construction-related activities may proceed.

Active nests in and adjacent to the
construction zone shall be avoided and
provided a minimum buffer as determined
by the qualified biologist (CDFW
recommends a 300-foot-wide nest avoidance
buffer or 500 feet for all active raptor nests)
prior to the commencement of construction.

Construction activities within the buffer must
be conducted at the discretion of the
qualified biologist.

Confirm that the actions required under this
mitigation measure are implemented for the
proposed project if construction will take
place during bird breeding season.

Prior to construction
activities carried out from
February 1 through August
31 Periodically City of
Oxnard
Planning
Division
Cultural Resources
MM-CR-1 Unanticipated Archaeological
or Paleontological Discoveries
Prior to the issuance of a grading permit, the
developer shall note on the plans for review
and approval by the City Engineer that if
historic, cultural or paleontological resources
are encountered during site grading or other
site work, all such work shall be halted
immediately within 50 feet of discovery and the
developer shall immediately notify the Planning
Division of the discovery. In such case, the
developer shall be required, at its own expense,
to retain the services of a qualified
archaeologist (or paleontologist, if it is a fossil
discovery) for the purpose of recording,
protecting, or curating the discovery as
appropriate. The archaeologist or paleontologist
shall be required to submit to the Planning
Division, for review and approval, a report of
the findings and method of curation or
Confirm that the actions required under
this mitigation measure are implemented
for the proposed project.

Prior to issuance of
grading permits.

Once City of
Oxnard
Planning
Division
858
Mitigation Monitoring and Reporting Program
4 Mitigation Measure/
Condition of Approval Action Required Monitoring Timing Monitoring
Frequency
Responsible
Agency
Compliance Verification
Initial Date Comments
protection of the resources. Further grading or
site work within 50 feet of discovery shall not
be allowed until the preceding work has
occurred.
859
RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL ADOPTING A MITIGATED
NEGATIVE DECLARATION 22-04 TO ALLOW FOR THE RENOVATION AND CONVERSION OF AN EXISTING 152,542 SQUARE FOOT WAREHOUSE INTO A THREE STORY (35 FEET IN HEIGHT), 202,741 SQUARE FEET OF

MINI-WAREHOUSE/SELF-STORAGE SPACE, INCLUDING A U-BOX
STORAGE WAREHOUSE OF 34,537 SQUARE FEET AND 3,050 SQUARE

FEET OF RETAIL SPACE, PERIMETER WALLS, LANDSCAPING AND
ASSOCIATED SITE IMPROVEMENTS ON AN 8.86-ACRE SITE LOCATED AT 2420 N. OXNARD BOULEVARD (APNs: 142-0-010-345, AND 142-0-021-010).

FILED BY FIROZ BARI, 15838 STRATHERN STREET, VAN NUYS,
CALIFORNIA 91406, THE APPLICANT.

WHEREAS, Firoz Bari filed entitlement applications with the City of Oxnard on August 21, 2017, Special Use Permit (PZ 17-500-11); and WHEREAS, if the aforementioned entitlement applications are collectively approved by the City of Oxnard, the project would be permitted to renovate a 8.86 acre project site with an adaptive reuse and conversion of an existing one-story (34 feet in height) 152,542 square foot warehouse into a three story (no change in height), 202,741 square-foot mini-warehouse/self-storage space, including a U-Box storage warehouse of 34,537 square feet and 3,050 square feet of retail space, security gates and perimeter walls, landscaping and associated site improvements at the subject project site (APNs:
142-0-010-345 and 142-0-021-010) (“Project”); and
WHEREAS, the City is the lead agency for purposes of the project pursuant to Public Resources Code section 21067; and
WHEREAS, the City determined that the Project and its associated actions are subject to the environmental review requirements of the California Environmental Quality Act (“CEQA”); and
WHEREAS, Pursuant to provisions of the California Environmental Quality Act and CEQA Guidelines, Section 15063, and following an Initial Study and environmental assessment of possible adverse impacts, the project will not have a significant effect on the environment because of the inclusion of certain mitigation measures for which lessened potential adverse impacts to a level of less than significant. Therefore, the Planning Division has prepared a Mitigated Negative Declaration with mitigation measures and monitoring program in accordance with the provisions of CEQA, including, without limitation CEQA Guidelines Sections 15070, 15071, 15072, and 15073, which have been incorporated as conditions; and
WHEREAS, a Notice of Intent to Adopt an Initial Study and Proposed Mitigated Negative Declaration (IS-MND) for the Project located at 2420 N. Oxnard Boulevard was published and posted on August 18, 2022, at the State Office of Planning and Research (OPR) website and at the Ventura County Recorder’s Office pursuant to CEQA 860
Resolution No. ______
Special Use Permit (PZ 17-500-11)
City Council Hearing Date: March 4, 2024

Page 3 of 4 ends

Guidelines Sections 15072 and 15073; and
WHEREAS, the public comment period on the IS/MND ran for twenty-one (21) days commencing on August 18, 2022 and ending on September 6, 2022; and WHEREAS, after the close of the comment period on the IS/MND, the IS/MND was modified as set forth in Chapter 4 of the Response to Comment document; and WHEREAS, the IS-MND was not legally challenged and thus is presumed valid in accordance with Public Resources Code section 21167.2 and section 15367 of the State CEQA Guidelines (Cal. Code Regs., Title. 14, § 15000 et seq.); and WHEREAS, the Development Advisory Committee (DAC) reviewed the plans on February 3, 2021, June 9, 2021 and October 6, 2021 and provided conditions of approval for the project; and
WHEREAS, on November 17, 2022, the Planning Commission conducted a duly noticed public hearing to consider adopting the MND 22-04 and continued the hearing to a future hearing date to allow for the project applicant to provide updated project information; and
WHEREAS, on January 5, 2023, the Planning Commission continued the project to allow for staff to prepare a final resolution to consider adopting the MND 22-04; and WHEREAS, on February 2, 2023, the Planning Commission voted to recommend that the City Council adopt IS/MND 22-04 and the associated Mitigation Monitoring Reporting Program (MMRP) ; and
WHEREAS, on April 13, 2023, the City Council of the City of Oxnard conducted a duly noticed public hearing, and received and reviewed all written and oral evidence related to the Final IS/MND 22-04; and
WHEREAS, the City Council finds after due study and deliberation that the public interest and general welfare require the adoption of the Final IS/MND 22-04; and WHEREAS, the comments of the Councilmembers, agencies, interested groups, and members of the public have received adequate responses; and WHEREAS, the Applicant agrees as a condition of this Resolution that at its own expense, to indemnify and defend the City of Oxnard and its agents, officers and employees from and against any claims, actions or proceedings to attack, set aside, void or annul the approval of this Resolution or any actions or proceedings, acts or determinations taken, done or made before the approval of this Resolution that were part of the approval process.
861
Resolution No. ______
Special Use Permit (PZ 17-500-11)
City Council Hearing Date: March 4, 2024

Page 3 of 4 ends

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OXNARD:

SECTION 1. The Recitals above are true and correct and incorporated herein by this reference.

SECTION 2. The Final IS/MND has been completed in compliance with the California Environmental Quality Act (California Public Resources Code Section 21000 – 21189).

SECTION 3. The Final IS/MND was presented to the City Council, which, at a hearing before the public, reviewed and considered the information contained in the Initial Study/Mitigated Negative Declaration prior to making a determination regarding the Project and its associated development entitlements.

SECTION 4. Based on the entire record before the City Council and all written and oral evidence presented, including the City Council Staff Report and all attachments thereto, the City Council finds pursuant to CEQA Guidelines §15074, the Final IS/MND reflects the City’s independent judgment and analysis. The City Council has independently reviewed and analyzed the Final IS/MND 22-04 prepared for the Project.

The Final IS/MND 22-04 is an accurate and complete statement of the potential environmental impacts of the project. The Final IS/MND 22-04 was prepared under the direction of the City of Oxnard Planning Division and reflects its independent judgment and analysis of the environmental impacts.

SECTION 5. The City Council hereby adopts the Final IS/MND 22-04, set forth attached hereto and incorporated herein by reference, and based thereon and on the Record as a whole, the City Council finds that all potentially significant environmental effects of the Project its associated development entitlement actions have been reduced to a less-than-significant level in that all significant environmental effects have been eliminated or substantially lessened as set forth in the IS-MND. Based upon the foregoing, the City Council finds and determines that the Project and its associated actions will not have a significant effect upon the environment.

SECTION 6. The City Council hereby adopts the mitigation measures set forth in the Final IS/MND 22-04 and its accompanying Mitigation, Monitoring, and Reporting Program (“MMRP”), pursuant to Public Resources Code Section 21081.6, which is a program design to ensure compliance with the mitigation measures imposed to avoid or substantially lessen the significant effects identified in the Mitigated Negative Declaration/Initial Study and said mitigation measures are described in the MMRP included therein and incorporated herein by reference.
862
Resolution No. ______
Special Use Permit (PZ 17-500-11)
City Council Hearing Date: March 4, 2024

Page 3 of 4 ends

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Oxnard hereby adopts an Final IS/MND 22-04, attached to the staff report and incorporated by reference.

PASSED AND ADOPTED this 4th day of March 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

ATTEST:
______________________________ ________________________________ Rose Chaparro, City Clerk John C. Zaragoza, Mayor
APPROVED AS TO FORM:
___________________________________
Stephen M. Fischer, City Attorney
863
RESOLUTION NO. ________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OXNARD
APPROVING PLANNING AND ZONING PERMIT NO. 17-500-11 (SPECIAL

USE PERMIT) TO ALLOW FOR THE RENOVATION AND CONVERSION
OF AN EXISTING 152,542 SQUARE FOOT WAREHOUSE INTO A THREE STORY (35 FEET IN HEIGHT), 202,741 SQUARE FEET OF

MINI-WAREHOUSE/SELF-STORAGE SPACE, INCLUDING A U-BOX
STORAGE WAREHOUSE OF 34,537 SQUARE FEET AND 3,050 SQUARE

FEET OF RETAIL SPACE, PERIMETER WALLS, LANDSCAPING AND
ASSOCIATED SITE IMPROVEMENTS ON AN 8.86-ACRE SITE LOCATED AT 2420 N. OXNARD BOULEVARD (APNS: 142-0-010-345 AND
142-0-021-010). FILED BY DAVID RANDI, 2420 N OXNARD BLVD, OXNARD, CA 93036, THE APPLICANT.

WHEREAS, on August 21, 2017, Firoz Bari (the “Applicant” and/or “Developer”) submitted a request to approve Planning and Zoning Permit No. 17–500-011 (Special Use Permit) to renovate a 8.86 acre project site with an adaptive reuse and conversion of an existing one-story (34 feet in height) 152,542 square foot warehouse into a three story (no change in height), 202,741 square-foot mini-warehouse/self-storage space, including a U-Box storage warehouse of 34,537 square feet and 3,050 square feet of retail space, security gates and perimeter walls, landscaping and associated site improvements at the subject project site (APNs:
142-0-010-345 and 142-0-021-010) (“Project”); and
WHEREAS, on November 17, 2022, the Planning Commission of the City of Oxnard (“Planning Commission”) conducted a duly noticed public hearing, and received and reviewed all written and oral evidence related to the proposed Project, in accordance with Sections 16-536 and 16-135(B) of the Oxnard City Code (OCC) and continued the project to a future hearing date to allow for the project applicant to provide updated project information; and WHEREAS, on January 5, 2023, the Planning Commission of the City of Oxnard received and reviewed all updated written and oral evidence related to the proposed Project, in accordance with Sections 16-536 and 16-135(B) of the Oxnard City Code (OCC) and continued the project to allow for staff to prepare final resolutions for Planning Commission recommended approval; and
WHEREAS, on February 2, 2023, the Planning Commission of the City of Oxnard voted 5-1-1, to adopt Resolution No. 2023-04 to recommending City Council approve the project; and WHEREAS, section 16-135(B) of the OCC authorize the City Council to approve uses not currently listed in the C-2 zone, including mini-warehouse/self-storage, warehouse, and truck rentals; and
WHEREAS, on April 13, 2023, the City Council was scheduled to conducted a duly noticed public hearing to consider the Planning and Zoning Permit No. 17-500-11 (Special Use Permit) in accordance with Oxnard City Code Sections 16-530 through 16-553 of the Oxnard 864
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 2 of 31 ends

City Code; however prior to the hearing the Applicant requested that the City pull the item from the agenda to be rescheduled of the project to a date ; and WHEREAS, the City Council finds, after due study, deliberation and public hearing, that the project meets the criteria set out in Sections 16-536 and 16-135(B) of the OCC; and WHEREAS, the City of Oxnard as the Lead Agency, has prepared Final IS/MND 22-03 in accordance with the requirements of the California Environmental Quality Act (CEQA, Public resources Code § 21000, et seq.), the regulations promulgated thereunder (14 California Code of Regulations, §15000, et seq., CEQA Guidelines), and the City’s Environmental Review Guidelines; and
WHEREAS, Pursuant to provisions of the California Environmental Quality Act and CEQA Guidelines, Section 15063, and following an Initial Study and environmental assessment of possible adverse impacts, the project will not have a significant effect on the environment because of the inclusion of certain mitigation measures for which lessened potential adverse impacts to a level of less than significant. Therefore, the Planning Division has prepared a Mitigated Negative Declaration (22-04) with mitigation measures and monitoring program in accordance with the provisions of CEQA which have been incorporated as conditions; and WHEREAS, the Project has been reviewed by the Development Advisory Committee (DAC) and the DAC has prepared conditions of approval that are incorporated within the recommended permits; and
WHEREAS, the City Council finds that the Project conforms to the City of Oxnard 2030 General Plan elements thereof and the Oxnard City Code for the reasons set forth in the Staff Report; and
WHEREAS, the City Council finds after due study and deliberation that the applicant agrees with the necessity of and accepts all elements, requirements, and conditions of this Resolution as being a reasonable manner of preserving, protecting, providing for, and fostering the health, safety, and welfare of the citizenry in general and the persons who work, visit or live in this development in particular.

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OXNARD APPROVES PLANNING AND ZONING PERMIT NO. 17-500-11 (SPECIAL USE PERMIT), SUBJECT TO THE FOLLOWING FINDINGS AND CONDITIONS:

SECTION 1. The Recitals above are true and correct and incorporated herein by this reference.

SECTION 2. The City Council finds that the Special Use Permit is internally consistent with all other provisions of the City of Oxnard 2030 General Plan if the City Council finds the proposed uses consistent with the intent and purpose of the Commercial General Land Use Designation and the General Commercial Zoning Designation.

SECTION 3. The City Council finds that the Special Use Permit will not be 865
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 3 of 31 ends

detrimental to the public interest, health, safety, convenience, or welfare of the City.

SECTION 4. Based on the entire record before the City Council and all written and oral evidence presented, including the Special Use Permit Staff Report and all attachments thereto, the City Council finds:

1. The proposed use is in conformance with the General Plan and other adopted policies of the City of Oxnard.

As described in the Staff Report, the existing underutilized warehouse/showroom (2420 N. Oxnard Boulevard) would be renovated and converted into a mini-warehouse/personal storage facility. The Project has a zoning designation of General Commercial, Planned Development (C-2-PD) which is consistent with the 2030 General Plan land use designation of Commercial General. The proposed Project is an adaptive reuse of the existing warehouse and showroom and would not involve any new expansion of the existing building footprint and would maintain the current overall building height of 34 feet. The applicant proposes to convert the existing parking lot at the north end of the site into a new moving truck rental storage/equipment area. The applicant is also proposing to build a new screen wall which will mimic the primary building to completely screen the proposed truck and equipment rental staging area. The remainder of the parking area to the north would be for customer parking.

A parking demand study was completed to evaluate and determine the appropriate amount of required parking for the project. Currently the OCC does not stipulate parking requirements for mini-warehouse/storage use. The study reviewed the parking requirements based on the OCC for the applicable retail and warehouse land uses and the ITE parking generation manual, 4th Edition for the mini-warehouse land use. Based on those requirements the project would require 63 parking spaces. As proposed the project is providing 75 standard parking spaces and 2 motorcycle parking spaces. Currently, a parking easement exists between the U-Haul site and the adjacent parcel to the south (Marseilles Property, 2368 N. Oxnard Boulevard), which allows 18 spaces on the U-Haul site to be used by the Marseilles property. For purposes of meeting City parking code requirements, these shared spaces cannot be counted towards the U-Haul site total parking supply. However, even with the exclusion of these parking spaces the total exceeds the City’s minimum requirement of 63 spaces.

The proposed development would involve renovating the existing structure, including an updated façade. The modifications to the façade would implement neutral paint colors, minimal advertising per OCC (Chapter 16, Article IX), and a variety of materials to help create varied visual character. The front of the building visible from Oxnard Boulevard, as shown in the west elevation of the project plans (Sheet A-203-Attachment B), would consist primarily of light stone colored and ribbed metal paneling, broken up by windows on the single-story section of the building. 866
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 4 of 31 ends

The two-story portion of the existing building would utilize off-white as the primary color, with accents of beige ribbed paneling on the building corners, and in three equally spaced divisions along the west elevation, to break up the building’s visual massing. The building façade would also include wall mounted metal landscape trellises on the single-single story portions of the west and east elevations and windows at the corners of the warehouses where retail spaces would exist. Lastly, the proposed screen wall would be designed to mimic the improved building. The proposed modifications would not contrast significantly with the visual character of the surrounding structures.

The adjacent structure to the south of the proposed project site has a stone block outer wall construction with painted metal paneling near the roof. The beige colors proposed for the Project would be similar to the adjacent structure, and the metal paneling accents would have a shared theme. The structures further to south, also have a similar color scheme, with a beige colored stone exterior with light brown accents.

The Project includes new landscaping throughout the project site in two phases.

Phase I landscaping was installed under the minor modification (PZ 17-140-02) and included replacing 26,865 square feet of the existing perimeter landscaping with new trees, shrubs, and ground cover. Phase II landscaping would include 38,646 square feet of new interior parking lot landscaping at the north end of the site, new tree canopies to be planted along the south end of the site and new landscaping at the rear site adjacent to the railroad tracks. Additional, landscape modification will be made to the initial Phase I landscaping to improve the screening of the storage area. This is an important improvement as Oxnard Blvd is a designated scenic corridor which requires a landscaped buffer of at least 30 feet, and functions as a primary entry way into the core of the City. The existing parking lot and interior access road is located within this 30-foot area and is considered to be a “legal nonconforming” existing condition. Additional landscaping is proposed to be installed, along the northern portion of the project sign, including in the adjacent right of way, as conditioned. The Project incorporates native and water wise plants and is conditioned to comply with City’s Landscape and Water Conservation Standards (Ordinance No. 2822) and applicable water conservation requirements of the State of California.

As shown above, the Project, as designed and conditioned, meets all applicable development standards. Therefore, the proposed project is in compliance with the 2030 General Plan and other adopted policies of the City of Oxnard and meets this Finding.

2. The nature, condition and development of adjacent uses, buildings and structures shall be considered, and no proposed Special Use Permit shall be granted if the approval body finds such use will adversely affect or be materially detrimental to the adjacent uses, buildings or structures or to the public health, safety or general welfare.
867
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 5 of 31 ends

As described in the Staff Report, pursuant to the 2030 General Plan land use designation “Commercial General” and the “General Commercial, Planned Development” zoning district, the proposed use of the project site as a mini-warehouse/self-storage, warehouse, and truck and equipment rentals are uses authorized by City Council, subject to a Special Use Permit. The surrounding uses are characterized by commercial uses, which are predominantly grocery and retail, auto repair and residential neighborhood uses. Construction activities, anticipated uses, and development design will be subject to standard construction requirements of the Building, Fire, and Traffic Codes as well additional conditions listed below and, in the Final IS/MND Mitigation Monitoring Reporting Program (MMRP).

Therefore, the proposed use and improvements, as conditioned, will not adversely affect or be materially detrimental to the adjacent uses, buildings, or structures or to the public health, safety or general welfare.

3. The site that is subject to the Special Use Permit shall be adequate in size and shape to accommodate the yards, walls, fences, parking and loading facilities, landscaping, and items which may be required by Section 16-532 (Conditions).

As described in the Staff Report, the project as designed and conditioned meets the development standards of the General Commercial (C-2) zone as described above in Section 4(1). Pursuant to the Zoning Code, the Project in a renovation and conversion of an existing warehouse and showroom has been designed to be consistent with the maximum building height, front, side and rear setbacks, and lot coverage. As detailed in the Staff report and attached parking study demand, the provided parking is sufficient for the proposed uses, and thus the site is sufficient to accommodate the required parking. As such, the subject site is adequate in terms of size and as developed the development meets or exceeds City’s design standards.

Additionally, the project has been reviewed by the Development Advisory Committee and was determined that it would have no significant impact on the public health, safety, or welfare and the project plans have been reviewed by all applicable departments and outside agencies, which include the Oxnard Police and Fire Departments. As such, this project meets this finding.

4. The site that is subject to the Special Use Permit shall be served by highways adequate in width and improved as necessary to carry the kind and quantity of traffic such use will generate.

As described in the Staff Report, the existing development on the project site includes an events center building. The project site has two access points from Oxnard Boulevard via an existing driveway at the south end of the site and a proposed driveway towards the north end of the site. In addition to the improved onsite circulation, the Project has been conditioned to install a Gold Coast Transit bus stop adjacent to the slip/merge to the north of the driveway. The stop shall have a 868
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 6 of 31 ends

minimum of 30 feet of standard width sidewalk with an additional 8’ x 30’ pad to the north of the driveway. The City finds that the proposed project, as conditioned, and in the context of the documentation provided and reviewed demonstrate that there is sufficient parking capacity. Additionally, a new traffic signal is required to be installed at the intersection of Orchard Place and North Oxnard Boulevard. Therefore, the site has sufficient access to streets and highways that are adequate in size and existing intersections adjacent to the project site will operate at acceptable levels of service.

5. The site that is subject to the Special Use Permit shall be provided with adequate sewerage, water, fire protection and storm drainage facilities.

As described in the Staff Report, the existing underutilized warehouse/showroom (2420 N. Oxnard Boulevard) would be renovated and converted into a mini-warehouse/personal storage facility. The proposed Project improvements have been found to be consistent with anticipated development for this site. Furthermore, the Project will be served by existing City of Oxnard water and sewer mains and adequate Fire Protection will be provided as determined by the Development Advisory Committee. In accordance with the Stormwater Quality Conditions of this Resolution, the Project’s design will comply with stormwater control measures as required by the Los Angeles Regional Water Quality Control Board’s municipal separate storm sewer system (“MS4”) permit. The Project is consistent with the level of development identified under the General Plan and Oxnard City Code, and therefore are within the anticipated level of development. The project is not anticipated to result in any significant impacts to utilities and public services.

Therefore, the site for the proposed use will be provided with adequate sewage, water, fire protection and storm drainage facilities.

SECTION 5. The City Council, in accordance with the California Environmental Quality Act (CEQA), determines that after implementation of standard conditions and mitigation measures identified in the Final IS/MND 22-04, all potentially significant impacts associated with the proposed project would be reduced to less than significant levels.

SECTION 6. Based on the findings set forth herein and the Staff Report and all attachments thereto, the City Council hereby approves Planning and Zoning Permit No. 17-500-11 (Special Use Permit), subject to the attached conditions of approval.

SECTION 7. The decision of the City Council shall be final.

SECTION 8. The City Clerk shall certify the adoption of this Resolution. [Remainder of this page left intentionally blank.]
869
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 7 of 31 ends

CONDITIONS OF APPROVAL
Note: The abbreviations below identify the City department or division responsible for determining compliance with these standard conditions. The first department or division listed has responsibility for compliance at plan check, the second during inspection and the third at final inspection, prior to issuance of a certificate of occupancy, or at a later date, as specified in the condition. If more than one department or division is listed, the first will check the plans or inspect the project before the second confirms compliance with the condition. The italicized code at the end of each condition provides internal information on the source of each condition: Some are standard permit conditions (e.g. G-1) while some are taken from environmental documents (e.g. MND-S2).

DEPARTMENTS AND DIVISIONS
CA City Attorney PL Planning
DS Dev Services/Eng Dev/Inspectors TR Traffic
PD Police B Building Plan Checker
SC Source Control FD Fire
PK Landscape Design CE Code Enforcement

GENERAL PROJECT CONDITIONS

1. This permit is granted for the property described in the application on file with the Planning Division, and may not be transferred from one property to another (PL, G-1).

2. This permit is granted for the plans dated March 4, 2024, (“the plans”) on file with the Planning Division. The Project shall conform to the plans, except as otherwise specified in these conditions, or unless a Minor Modification to the plans is approved by the Planning and Environmental Services Manager (“Planning Manager”) or a Major Modification to the plans is approved by the City Council. A Minor Modification may be granted for minimal changes or increases in the extent of use or size of structures or of the design, materials or colors of structures or masonry walls. A Major Modification shall be required for substantial changes or increases in such items (PL, G-2).

3. This permit shall automatically become null and void 36 months from the date of its issuance, unless Developer has diligently developed the proposed project, as shown by the issuance of a grading, foundation, or building permit and the construction of substantial improvements (PL, G-3).
870
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 8 of 31 ends

4. All required off-site and on-site improvements for the project, including structures, paving, and landscaping, shall be completed prior to occupancy unless the Development Services Manager allows the Developer to provide security or an executed agreement approved by the City Attorney to ensure completion of such improvements (DS, G-4).

5. By commencing any activity related to the Project or using any structure authorized by this permit, Applicant accepts all of the conditions and obligations imposed by this permit and waives any challenge to the validity of the conditions and obligations stated therein (CA, G-5).

6. Applicant agrees, as a condition of adoption of this resolution, at Applicant’s own expense, to indemnify, defend and hold harmless the City and its agents, officers and employees from and against any claim, action or proceeding to attack, review, set aside, void or annul the approval of the resolution or any condition attached thereto or any proceedings, acts or determinations taken, done or made prior to the approval of such resolution that were part of the approval process (CA, G-6).

7. Any covenants, conditions, and restrictions (CC&Rs) applicable to the Project property shall be consistent with the terms of this permit and the City Code. If there is a conflict between the CC&Rs and the City Code or this permit, the City Code or this permit shall prevail (CA, G-7).

8. Applicant shall complete the “Notice of Land Use Restrictions and Conditions” form, using the form provided by the City, for recording with the Ventura County Recorder.

Before the City issues building permits, Applicant shall submit the original completed, signed and notarized document, together with the required fees to the Planning Manager (PL, G-8).

9. Developer shall provide off-street parking for the project as detailed in the Parking Study Demand (dated January 19, 2022), including the number of spaces, stall size, paving, striping, location, and access, as required by the City Code.

10. Before placing or constructing any signs on the Project property, Applicant shall obtain a sign permit from the City. Except as provided in the sign permit, Applicant may not change any signs on the Project property (PL/B, G-10).

11. Developer shall obtain a building permit for any new construction or modifications to structures, including interior modifications, authorized by this permit (B, G-11).

12. Developer shall not permit any combustible refuse or other flammable materials to be burned on the project property (FD, G-12).

13. Developer shall not permit any materials classified as flammable, combustible, radioactive, carcinogenic or otherwise potentially hazardous to human health to be 871
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 9 of 31 ends

handled, stored or used on the project property, except as provided in a permit issued by the Fire Chief (FD, G-13).

14. If Developer, owner or tenant fails to comply with any of the conditions of this permit, the Developer, owner or tenant shall be subject to a civil fine pursuant to the City Code (CA, G-14).

15. Prior to issuance of building permits, Developer shall correct all violations of the City Code existing on the project property for which the Code Compliance Division has open cases (PL, G-15).

LANDSCAPE STANDARD CONDITIONS

16. Prior to submittal of landscape and irrigation plans, Developer shall obtain approval of the Planning Manager or designee of a plan showing on the project property all existing trees and identifying the trees to be saved, transplanted or removed (PK, PK-1).

17. Prior to issuance of building permits or the proposed use is initiated, whichever comes first, Developer shall submit two copies of landscape and irrigation plans, along with the appropriate permit application and fees, to the Development Services Division and obtain approval of such plans (PK/DS, PK-2).

18. Prior to issuance of a certificate of occupancy, Developer shall install landscape and automatic irrigation systems that have been approved by Parks and Facilities Superintendent (PK, PK-3).

19. Developer shall properly maintain landscape planting and all irrigation systems as required by the City Code and as specified by this permit. Failure of Developer to do so may result in the revocation of this permit and initiation of legal proceedings against Developer to ensue compliance (PK, PK-4).

20. Prior to the issuance of a certificate of occupancy, Developer shall provide a watering schedule to the building owner or manager and to Planning Division or designee. The irrigation system shall include automatic rain shut-off devices, or instructions on how to override the irrigation system during rainy periods (PK, PK-5).

21. All trees planted or placed on the property by Developer shall be at least 24-inch-box size. All shrubs and vines shall be at least five-gallon size, except as otherwise specified by this permit (PK, PK-6).

22. At the time of landscape plan check submittal, the landscape planting and irrigation plans shall comply with the current title 23 Model Water Efficient Landscape Ordinance (MWELO) (PK, PK-7.1).
872
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 10 of 31 ends

23. Developer shall install an irrigation system that includes a water sensor shut off device as a water conservation measure (PK, PK-22).

24. At time of submittal to the Building and Engineering Division for plan check, Developer’s Landscape Architect or Architect shall provide the City with written confirmation that they have reviewed the civil engineering construction drawings and that the NPDES requirements are not in conflict with meeting the City’s landscape requirements (PK, PK-23).

25. Developer shall include a note on the Landscape Plans submitted to the Building and Engineering Division for a building permit that “all landscaping and irrigation comply with Ordinance No. 2822, which adopted the City of Oxnard Landscape Water Conservation Standards, and applicable water conservation requirements of the State of California” (PK, PK-24).

26. At the time of Plan Check submittal, the landscape plans shall contain an exhibit titled “Tree Tabulation Chart”. The Tree Tabulation Chart shall contain a listing of all existing trees on site and shall refer to them by number as identified in the Arborist’s Tree Report.

The Tree Tabulation Chart shall clearly list all trees to remain, be removed or transplanted. The Chart shall contain the Arborist’s economic appraisal value of each tree(s) removed as well as computations and calculations showing how the value of the removed tree(s) was put back into new tree sizes for the project that are in addition to meeting the City’s minimum tree size of 24” box. Where the value of the trees cannot be accommodated onsite, as determined by the City, the City may approve an alternative method for replacing the value of the removed trees. The appraisal does not need to include the value of the trees required to be removed and replaced within the City of Oxnard Right of Way (PK).

LANDSCAPE SPECIAL CONDITIONS

27. Site perimeter fencing and walls, adjacent to landscape planters, shall be bordered on both the interior and exterior sides with defensive landscaping. Defensive landscape elements adjacent to fencing shall be maintained in an uninterrupted hedge shape with a minimum height of 18-inches and a maximum height of 36-inches throughout the life of the project.

28. Landscape plan shall be revised to incorporate the installation and maintenance of landscaping in the adjacent parkway within the Right of Way between the northern driveway and the northern edge of the property. Final landscape plan shall be subject to approval by the Public Works and Community Development Departments.

29. Landscaping shall be maintained in conformance with approved project plans for the life of the project.

30. Developers shall remove and replace existing trees within the parkways at the top of the concrete embankments within the City Right of Way of Oxnard Boulevard, south of the 873
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 11 of 31 ends

railroad tracks on both sides of the street, which are or may cause damage to the concrete embankment, as determined by the City of Oxnard Community Development Department and Public Works Department. The type and location of replacement trees shall be determined by the City of Oxnard Community Development Department and Public Works Department. If tree replacement is not feasible in certain locations, alternative planting may be considered at the discretion of the City. The tree replacement plan shall be submitted and approved prior to the issuance of building permits. Tree removal and replacement shall be completed prior to Occupancy Clearance or Final Inspection.

PLANNING DIVISION SPECIAL CONDITIONS

31. Applicant shall deposit $3,000 for mitigation monitoring and reporting associated with development project, PZ 17-500-11. Such funds shall be deposited prior to issuance of a grading permit.

32. Applicant shall submit a check made out to the City of Oxnard for payment of any outstanding discretionary permit and environmental processing fees associated with the development project. Funds shall be deposited prior to issuance of a grading permit (PL).

33. These conditions of approval impose specific fees, dedications, reservations and/or other exactions. Pursuant to Government Code Section 66020, the 90-day period in which the Developer or applicant has to protest the imposed fees, dedications, reservations and/or other exactions has begun as of the date that the conditions of approval are approved.

34. Prior to issuance if building permits, the Developer shall use architectural coatings with ROC contents of 25 g/L or less (MND, AQ-1).

35. Per VCAPCD Guidelines, because project construction emissions would exceed 25 pounds per day for NOX, the following measures shall be implemented:
a. Minimize equipment idling time.
b. Maintain equipment engines in good condition and in proper tune as per manufacturers’ specifications.
c. Lengthen the construction period during smog season (May through October) to minimize the number of vehicles and equipment operating at the same time. d. Use alternatively fueled construction equipment, such as compressed natural gas, liquefied natural gas, or electric, if feasible.
e. In addition, per recent VCAPCD guidance on other projects, project construction shall use Tier 3 or above construction equipment for all off-road diesel equipment that has greater than 50 horsepower. A copy of each unit’s certified tier specification shall be provided at the time of mobilization of each applicable unit of equipment (MND AQ-2).
874
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 12 of 31 ends

36. Prior to construction activities carried out from February 1 to August 31, Nesting bird surveys shall be conducted by a qualified biologist prior to any construction activities during bird breeding season from February 1 through August 31. If no nesting birds are detected during these surveys, then construction-related activities may proceed. Active nests in and adjacent to the construction zone shall be avoided and provided a minimum buffer as determined by the qualified biologist (CDFW recommends a 300-foot-wide nest avoidance buffer or 500 feet for all active raptor nests) prior to the commencement of construction. Construction activities within the buffer must be conducted at the discretion of the qualified biologist (MND BIO-1).

37. Prior to issuance of grading permits, the Developer shall note on the plans for review and approval by the City Engineer that if historic, cultural or paleontological resources are encountered during site grading or other site work, all such work shall be halted immediately within 50 feet of discovery and the developer shall immediately notify the Planning Division of the discovery. In such case, the developer shall be required, at its own expense, to retain the services of a qualified archaeologist (or paleontologist, if it is a fossil discovery) for the purpose of recording, protecting, or curating the discovery as appropriate. The archaeologist or paleontologist shall be required to submit to the Planning Division, for review and approval, a report of the findings and method of curation or protection of the resources. Further grading or site work within 50 feet of discovery shall not be allowed until the preceding work has occurred (MND-CR-1).

38. Developer shall remove any and all graffiti from the project premises within 24 hours of its appearance. The surface of such affected areas shall be matched to blend in with the underlying colors and/or design, and shall not look like a paint patch and shall extend to the nature breaks in the wall/material.

39. Before the City issues building permits, Developer shall provide a Graffiti Deterrent Plan, subject to the approval of the Planning Manager. Such plan shall include such elements as clear film on windows and/or mirrors, as well as washable paint and sealers on the building and perimeter walls (PL).

40. Applicant shall screen, to the satisfaction of the Planning Manager, any HVAC equipment visible from the public right-of-way. Screening plants shall be consistent with other species on the property and a minimum size of five gallons (PL).

41. Developer shall repair and/or replace any existing broken or damaged sidewalk, curb gutter or asphalt paving adjacent to property due to the construction of the Project, as directed by the City Inspector (DS).

42. Prior to issuance of demolition permits for any structure on the site, Developer shall provide evidence of notifying the Air Pollution Control District of such demolition.

Demolition and/or renovation activities shall be conducted in compliance with APCD regularities regarding Asbestos (Rule 63.7).
875
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 13 of 31 ends

43. During construction, Developer shall post and maintain onsite signs, in highly visible areas, restricting all vehicular traffic to 15 miles per hour or less.

44. During periods of high winds (i.e. wind speed sufficient to cause fugitive dust to impact adjacent properties), Developer shall cease all clearing, grading, earth moving, and excavation operations to prevent fugitive dust from being a nuisance or creating a hazard, either onsite or offsite.

45. Prior to grading permit approval, Developer shall include on the grading plans a reproduction of all conditions of this permit pertaining to dust control requirements (PL).

46. In the event that any historic or prehistoric cultural resources are discovered, work in the vicinity of the find shall be halted immediately. A City approved archeologist shall be retained to evaluate the discovery and determine the necessary mitigations for successful compliance with all applicable regulations. Developer or its successor in interest shall be responsible for paying all salaries, fees and the cost of any future mitigation resulting from the survey.

47. Developers or Operators shall not park, store, or stage rental trucks, trailers, semi-trucks, or other equipment outside of designated enclosed area or “Equipment Staging Area” area as identified on the project plans. Upon customer drop off of any rental equipment, rental equipment shall be immediately moved to the equipment staging area.

48. A solar photovoltaic (PV) system shall be installed, which complies with the California Energy Code and and shall have a total area no less than 15 percent of the total roof area of the building, including any canopy areas, and covered parking areas, subject to compliance with Southern California Edison Requirements. California Edison, as the local electric service provider, shall be consulted to ensure that PV system sizing will comply with the Energy Design Rating (EDR) targets.

49. Approval of Phase I of the Project shall expire in accordance with Condition Number 3 above. Approval of subsequent phases of the Project shall expire at the same time as Phase I or one year from the date of issuance of the Building Permit for the prior phase, whichever occurs later, unless prior to the expiration date, substantial physical construction has been completed on the subsequent phase of development or a time extension has been applied for by the Developer. The review authority with jurisdiction over the project may, upon good cause shown, approve a one time extension in compliance with City rules and regulations.

PLANNING DIVISION STANDARD CONDITIONS

50. Plans submitted by Developer with building permit applications shall show on the building elevation sheets all exterior building materials and colors, including product and finish manufacturer name, color name and number, and surface finish type (such as:
stucco with sand finish, plaster with smooth finish) to be used in construction (PL/B, PL-1).
876
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 14 of 31 ends

51. Any application for a Minor Modification to the project shall be accompanied by four copies of plans reflecting the requested modification, together with applicable processing fees (PL, PL-2).

52. Before the City issues building permits, Developer shall include a reproduction of all conditions of this permit as adopted by Resolution of the Community Development Director in all sets of construction documents and specifications for the project (PL, PL-3).

53. Before the City issues building permits, Developer shall provide to the Planning Manager color photographic reductions (8 1/2” by 11”) of full-size colored elevations and any other colored exhibit approved by the Community Development Director. Developer may retain the full-size colored elevations after the reductions are so provided (PL, PL-4).

54. Developer acknowledges that because of population limitations placed on the City by the Air Quality Management Program, approval of this permit does not guarantee that the City will issue building permits. The City’s issuance of building permits may be delayed as a result of implementation of an air quality plan (PL, PL-5).

55. Developer may not modify any use approved by this permit unless the Planning Division Manager determines that Developer has provided the parking required by the City Code for the modified use (PL, PL-7).

56. Project on-site lighting shall be of a type and in a location that does not constitute a hazard to vehicular traffic, either on private property or on adjoining streets. To prevent damage from vehicles, standards in parking areas shall be mounted on reinforced concrete pedestals or otherwise protected. Developer shall recess or conceal under-canopy lighting elements so as not to be directly visible from a public street.

Developer shall submit a lighting plan showing standard heights and light materials for design review and approval of the Planning Division Manager (PL/B, PL-8).

57. In order to minimize light and glare on the project property, all parking lot and exterior structure light fixtures shall be high cut-off type that divert lighting downward onto the property and shall not cast light on any adjacent property or roadway (PL, PL-9).

58. Prior to issuance of building permits, Developer shall pay a document imaging fee for the planning files in an amount calculated by planning staff at the time of building permit review based on fees then in effect (PL/B, PL-16).

59. During construction, Developer shall water the area to be graded or excavated prior to commencement of grading or excavation operations. Such application of water shall be at least twice per day and shall penetrate sufficiently to minimize fugitive dust during grading activities (B/DS, PL-11).
877
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 15 of 31 ends

60. During construction, Developer shall control dust by the following activities:
a. All trucks hauling graded or excavated material offsite shall be required to cover their loads as required by California Vehicle Code section 23114, with special attention to sub sections 23114(b)(2)(F), (e)(2) and (e)(4) as amended, regarding the prevention of such material spilling onto public streets and roads. b. All graded and excavated material, exposed soils areas, and active portions of the construction site, including unpaved onsite roadways, shall be treated to prevent fugitive dust. Treatment shall include, but not necessarily be limited to, periodic watering, application of environmentally-safe soil stabilization materials, and/or roll-compaction as appropriate. Watering shall be done as often as necessary and reclaimed water shall be used whenever possible (B/DS, PL-12).

61. Developer shall provide for dust control at all times during project property preparation and construction activities (B/DS, PL-13).

62. Developer agrees to participate in a water conservation program that includes refitting water fixtures existing on the project property with water conserving devices within residences or businesses in the City’s water service area, if such a program is in effect when building permits are issued for this project. Among the requirements of such a program might be refitting existing toilets, faucets, shower heads, landscaping irrigation or other fixtures and items that consume water within the structure (PL, PL-14).

63. Because of water limitations placed upon the City by its water providers, approval of this permit does not guarantee that the City will issue building permits. Issuance of building permits may be delayed as a result of implementation of a water conservation or allocation plan (PL, PL-15).

64. Prior to issuance of building permits, Developer shall pay a document imaging fee for the planning files in an amount calculated by planning staff at the time of building permit review based on fees then in effect (PL/B, PL-16).

65. Developer shall recess or screen roof heating and cooling systems and other exterior mechanical equipment from adjoining property and public streets, as required by this permit. Plumbing vents, ducts and other appurtenances protruding from the roof of structures shall be placed so that they will not be visible from the front of the property or other major public vantage points. Developer shall include a note on the construction plumbing drawings of exterior elevations to indicate to contractors that roof features shall be grouped and located in the described manner. Roof vents shall be shown on construction drawings and painted to match roof material color (PL/B, PL-41).

66. Developer shall install all roof and building rain gutters and downspouts to integrate as closely as possible with building design elements, including matching adjacent building colors as closely as possible. Developer shall submit a plan and scheme for approval by the Planning Division Manager prior to issuance of building permits (PL, PL-18). 878
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 16 of 31 ends

67. For any exterior utility meter panels, Developer shall paint such panels to match the structure upon which it is located. Such panels shall be located to take advantage of screening (e.g. landscaping or other building elements) from public right-of-ways, to the maximum extent feasible (PL, PL-43).

68. Developer shall stripe loading zones placed partly or wholly within a structure for loading and unloading activities only and post to prohibit storage or other non-loading activity within the loading zone (PL/B, PL-49).

GOLD COAST TRANSIT CONDITIONS

69. Developer shall install a Gold Coast Transit bus stop adjacent to the slip/merge to the north of the driveway, unless waived by the City Traffic Engineer. The stop shall have a minimum of 30 feet of standard width sidewalk with an additional 8’ x 30’ pad to the north of the driveway. The final design is subject to the review and approval of the City Traffic Engineer in coordination with the Gold Coast Transit District.

POLICE DEPARTMENT CONDITIONS

70. A condition of approval requires compliance with the Outdoor Lighting Code & Guideline
a. Outdoor lighting shall comply with Title 24, Part 6, of the California Code of Regulations: California’s Energy Efficiency Standards for Residential and Nonresidential Buildings.
b. Unless approved as a specific exception to this guideline, all outdoor lighting shall be flat lens, full cut-off fixtures with the light source fully shielded with the exceptions:
i. Luminaires with a maximum output of 260 lumens per fixture, regardless of number of bulbs (equal to one 20-watt incandescent light), may be left unshielded provided the fixture has an opaque top to keep light from shining directly up.
ii. Luminaires with a maximum output of 1,000 lumens per fixture, regardless of number of bulbs (equal to on 60-watt incandescent light) may be partially shielded provided the bulb is not visible, and the fixture has an opaque to keep light from shining directly up.
c. Oxnard City Code 16-320: Lighting within physical limits of the area required to be lighted shall not exceed seven foot-candles, nor be less than one food-candle at any point. A light source shall not shine upon, or illuminate directly any surface other than the area required to be lighted. No lighting shall be of a type or in a location that constitutes a hazard to vehicular traffic, either on private property or on the abutting streets. The height of light standards shall not exceed 26 feet. To prevent damage from automobiles, standards shall be mounted on reinforced concrete pedestals or otherwise protected.

71. Exterior lighting of the site including parking areas shall be between 1 and 7-foot candles 879
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 17 of 31 ends

and shall be in harmony with existing adjacent lighting scheme.

72. All exterior lighting shall operate from dusk to dawn.

73. All exterior LED lighting shall be of a similar nature and spectrum (3,000K to 20,000K Correlated Color Temperature).

74. Lighting instruments shall be full cut-off and installed so that light does not directly illuminate property outside the project site. Instruments shall not create glare for motorists or pedestrians.

75. Outdoor lighting instruments shall not be placed in close proximity of parking lot trees.

In the event outdoor lighting instruments and trees are in close proximity an additional sheet will be required illustrating light and tree placement showing trees with a 20-year maturity.

76. An integrated landscape/lighting/photometric plan shall be submitted illustrating a 20-year tree maturity. This is to ensure that tree growth will not adversely impact future lighting and therefore site safety as the project matures. Luminaires used in the photometric calculations shall only include those instruments mounted 8-feet or more above walking/driving surface. This plan shall be submitted and approved prior to the issuance of building permits.

77. Port Cocheres shall be illuminated between 7 and 15 foot-candles. Under canopy lighting instruments shall be installed on the ceiling of the canopy.

78. During the first year of operations after the issuance of the Certificate of Occupancy, a roving security patrol service shall monitor the site during the hours the business is closed. Monitoring shall include a tour check in system approved by the Police Department as part of the business’ Security Plan to ensure that outdoor storage is monitored while defensive plantings are maturing.

79. The outdoor vehicle storage area shall be fully enclosed by a fencing and/or wall system approved jointly by the Police Department and Community Development Department.

Vehicular gates shall be controlled by “Click-To-Enter” technology to provide 24-hour access to first responders.

Security Camera Systems – Businesses

80. Security cameras shall be installed and operated 24 hours a day to monitor the business.

The camera system shall comply with these minimum standards:
a) Cameras and supporting equipment shall supply digital color images under normal lighting conditions. Grayscale images are expected for infra-red lighting. 880
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 18 of 31 ends

b) Cameras shall be made by a reputable manufacturer and maintained to current industry standards.
c) Cameras shall have low light capability and able to identify persons conducting transactions or entering the business.
d) The video system shall utilize a Digital Video Recorder (DVR). VHS and other formats are prohibited.
e) The video system shall allow recording, live viewing and playback of recorded video for a period of a period of at least 30 days.
f) Recorded images shall bear a date and time stamp that cannot be altered. g) Camera installations shall cover areas open to the general public and where cash or other assets are maintained.
h) Cameras in domed casings are highly encouraged as their area of focus is not easily determined by a casual observer.
i) A camera shall be installed to monitor all persons entering the premises from each exterior doorway. The camera shall be mounted 7-feet above the floor and shall be adjusted to capture images of the head and shoulders of all who enter. j) A security camera plan shall be submitted and approved prior to the issuance of building permits. The plan shall be submitted in pdf format to [email protected].

Alarms

81. Any intrusion alarm system installed at the site shall utilize technology to differentiate between human and non-human motion. The alarm system shall be compliant with Oxnard City Code 11-95 through 11-100.

82. A security plan shall be submitted to and approved by the Police Department prior to the issuance of building permits. The submission shall be in a PDF format and sent to [email protected].

Signs

83. All vehicular entrances to the parking area shall be posted in compliance with California Vehicle Code 22658(a). Persons in lawful possession of the property may then cause the removal of a vehicle parked on the property to the nearest public garage if parked without the owner’s permission (PD).

84. Signs shall be posted around the site stating: “Trespassing Forbidden By Law Violators will be subject to arrest pursuant to 602 PC.”

85. Signs shall be posed around the site stating: “This Property Is Monitored By A Security Alarm and Camera System.”
881
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 19 of 31 ends

DEVELOPMENT SERVICES DIVISION STANDARD CONDITIONS

86. Developer shall pay plan check and processing fees in effect at the time of construction plan submittal and shall pay development fees, encroachment permit fees, and other applicable fees in effect at permit issuance (DS-1).

87. Developer’s Engineer shall design parking lot structural sections based on an analysis of the soils R-value and a traffic index (T.I.) approved by the City Engineer. The minimum structural section for parking lots is two inches of asphalt on four inches of base material.

Developer shall indicate the proposed structural section and design T.I. on the site improvement plans (DS-2).

88. Developer shall have the site improvement plans prepared using standard Development Services Division format(s) by a civil engineer licensed in the State of California. The plans shall incorporate recommendations from soil engineering and geology reports.

Prior to issuance of a grading permit, improvement plans must be approved by the City Engineer and ink-on-mylar plans filed with the Development Services Division (DS-3).

89. Developer shall submit improvement plans and drainage calculations demonstrating that storm drain runoff from the project property and all upstream areas will be safely conveyed to an 1. approved drainage facility. The design and conveyance route shall be compatible with the City’s Master Plan of Drainage and shall be approved by the City Engineer prior to approval of improvement plans (DS-4).

90. Developer shall replace all broken, uplifted, or missing curb, gutter, or sidewalk along the street frontage(s) of the project (DS-6).

91. Curb cut widths and design shall conform to City ordinances, standards, and policies in effect at the time City issues an encroachment permit (DS-9).

92. Developer shall provide fire hydrants such that all points of all structures are within one hundred fifty (150) feet of a fire hydrant, or as otherwise approved by the Fire Department. Fire hydrant line improvements shall be designed in accordance with City standards and shown on the civil site improvement plans prior to issuance of a site improvement/grading permit. Developer shall provide the City with an easement over onsite waterlines using standard City format (DS-11).

93. Developer shall enter into an agreement, approved as to form by the City Attorney, to install and construct all public improvements required by this permit and by the City Code. Developer shall post security satisfactory to the Finance Director, guaranteeing the installation and construction of all required improvements within the time period specified in the agreement or any approved time extension (DS-14).

94. A California licensed civil engineer shall prepare the public improvement plans and documents for this project in accordance with City standards and shall submit all such plans to the City Engineer. Submittal shall include, but not necessarily be limited to, grading, street, drainage, sewer, water and other appurtenant improvement plans, 882
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 20 of 31 ends

construction cost estimates, soils reports, and all pertinent engineering design calculations. City will not approve a parcel map or final map nor issue a grading, site improvement or building permit until the City Engineer has approved all improvement plans (DS-15).

95. Prior to issuance of a site improvement permit, Developer shall provide to the Development Services Division a compact Disc (CD) containing digital copies of all project maps, address map, and/or civil improvements drawings in DWG format. Prior to improvement bond release, Developer shall provide an updated CD containing all changes that occur during construction (DS-16).

96. Developer shall process permanent master planned improvements that are eligible for reimbursement in accordance with City policies, resolutions, and ordinances in effect at the time of recordation of the final map or parcel map or if there is no map, then at the time of public improvement plan approval (DS-17).

97. Developer shall provide all necessary easements for streets, highways, alleys, sidewalks, parkways, landscaping, utilities, drainage facilities, or other improvements as required by City. If such easements cannot be obtained from the property owner by negotiation, City may acquire them at the expense of Developer by exercise of the power of eminent domain. Developer shall bear all costs of eminent domain proceedings, including appraisal, acquisition, attorney’s fees, and court costs. Before City issues a site improvement permit, Developer shall dedicate all required easements to City (DS-19).

98. Developer shall remove graffiti from the project, including graffiti on offsite public infrastructure under construction by Developer, within 24 hours of its appearance. If the Developer fails to remove graffiti in accordance with this condition, the City may at the discretion of the Development Services Manager issue a stop work order until such time as the graffiti is removed. (DS-20)

99. The conditions of this resolution shall prevail over all omissions, conflicting notations, specifications, dimensions, typical sections, and the like, that may or may not be shown on the improvement plans (DS-21).
100. Developer shall pay the cost of all inspections of on‑site and off‑site improvements (DS-22).
101. Developer shall be responsible for all project‑related actions of Developer's employees, contractors, subcontractors, and agents until City accepts the improvements (DS-23).
102. Prior to beginning construction, Developer shall designate in writing an authorized agent who shall have complete authority to represent and to act for Developer. The authorized agent shall be present at the work site whenever work is in progress.

Developer or the authorized agent shall make arrangements acceptable to City for any emergency work. When City gives orders to the authorized agent to do work required for the convenience and safety of the general public because of inclement weather or any 883
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 21 of 31 ends

other cause, and the orders are not immediately acted upon by the authorized agent, City may do or have such work done by others at Developer's expense (DS-24). 103. "Standard Specifications for Public Works Construction" latest edition (including modifications thereto by City) and applicable City Standard Plates and Design Criteria shall be the project specifications, except as noted otherwise on the approved improvement plans. City reserves the right to upgrade, add to, or revise these specifications and plans and all other City ordinances, policies, and standards. If the improvements required of this project are not completed within 12 months from the date of City’s approval of the improvement plans, Developer shall comply with and conform to any and all upgraded, additional or revised specifications, plans, ordinances, policies and standards (DS-27).
104. Developer shall retain a California licensed Civil Engineer to ensure that the construction work conforms to the approved improvement plans and specifications and to provide certified "as‑built" plans after project completion. Developer’s submittal of certified "as‑built" plans is a condition of City’s final acceptance of the project and release of any associated security (DS-29).
105.All grading shall conform to City's standard grading notes, City Code, and recommendations of Developer’s soils engineer as approved by the City Engineer (DS-30).
106.Storm drain, sewer and water facilities shall conform to applicable City Master Plans.

Developer shall prepare plans for these facilities in accordance with City’s engineering design criteria in effect at the time of improvement plan submittal. Developer shall submit plans with pertinent engineering analyses and design calculations for review and approval by the City Engineer prior to issuance of a site improvement permit (DS-34). 107.Developer shall design project grading to convey stormwater to a street, alley, or approved drain so that there are no undrained depressions (DS-35). 108.Developer shall dispose of sewage and solid waste from the project by City’s wastewater and solid waste systems in a manner approved by the City Engineer (DS-38). 109.Developer shall install water mains, fire hydrants and water services in conformance with City standard plates, design criteria and specifications as directed by the City Engineer (DS-41).
110. Developer shall install adequately sized water services and meters to each lot or unit in accordance with City standards in effect at the time of building permit issuance. There shall be no interconnections between structures (DS-42). 111. Developer shall install City approved backflow prevention devices for water connections if so ordered by the City Engineer (DS-45).
112. Prior to designing the water system for the project, Developer shall have a certified fire flow test performed to determine existing water pressure and flow characteristics. The 884
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 22 of 31 ends

water system shall be designed to allow for a 10 psi drop in the static water pressure measured during the fire flow test. After construction and before City issues a certificate of occupancy, the City Engineer may require a second test. Developer shall obtain permits from the City Engineer prior to performing tests. Developer shall have all tests certified by a mechanical, civil, or fire protection engineer and provide written results of all tests to the City Engineer (DS-47).
113. Developer shall improve all streets, alleys, sidewalks, curbs, and gutters adjacent to the project in accordance with City standards, as necessary to provide safe vertical and horizontal transitions (DS-52).
114. Developer shall install all water, gas, sewer, storm drain, electrical, cable television, and telephone lines before any paving is placed (DS-54).
115. Developer shall submit a landscape irrigation plan prepared by a licensed professional,showing proper water meter size, backflow prevention devices, and cross‑connection control (DS-59).
116. Developer shall submit a street lighting plan as a part of the civil improvement plans.

Developer shall install streetlights in accordance with the plan (DS-60). 117. As a part of the site improvement plans, Developer shall submit a master utility plan that shows the relative location of all public and private utilities (including gas, electric, street lights, telephone and cable television lines) in accordance with City standard plans (DS-61).
118. Developer shall be responsible for and bear the cost of replacement of all existing survey monumentation (e.g., property corners) disturbed or destroyed during construction, and shall file appropriate records with the Ventura County Surveyor's Office (DS-64). 119. Developer shall provide adequate vehicle sight distance as specified by CalTrans specifications at all driveways and intersections (TR-71). 120.Developer shall install bike racks in accordance with City standards at locations approved by City Traffic Engineer (TR-73).
121.Prior to issuance of a building permit, all traffic signal, pavement marking and sign plans shall be prepared by a registered California traffic engineer and approved by the City Engineer prior to issuance of a grading, site improvement or a building permit (TR-74). 122.Prior to issuance of an encroachment permit, Developer’s shall obtain City’s approval of a contractor qualified to install traffic signals, pavement markings and signs (TR-76). 123.Developer shall design project to minimize degradation of stormwater quality by complying with the applicable sections of the Los Angeles Regional Water Quality Control Board’s municipal separate storm sewer system (“MS4”) permit (Order R4-2010-0108 including all revisions) for new development and redevelopment projects.

Developer shall submit stormwater quality calculations and associated construction plans 885
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 23 of 31 ends

demonstrating compliance with the MS4 permit. Calculations shall generally be organized to follow the steps outlined in Chapter 2 of the 2011 Technical Guidance Manual for Stormwater Control Measures (“2011 TGM”) (DS-78). 124.Developer’s stormwater quality calculations shall include site specific analysis and recommendations from a geotechnical engineer, and if applicable, a landscape architect for design and implementation of stormwater treatment and infiltration devices.

Geotechnical Engineering analysis and recommendations shall include, but not necessarily be limited to, determination of site specific soil infiltration rates, depth to permeable soil layers, methods to reach permeable soil layers, appropriate compaction rates, recommendations to enhance infiltration, and other requirements of the 2011 TGM.

Landscape architectural recommendations shall include, but not necessarily be limited to, suggestions regarding appropriate vegetation and soil amendments for vegetated infiltration devices. Project plans shall implement approved design recommendations (DS-81).
125.Using forms provided by the Development Services Division, Developer shall submit a stormwater quality control measures maintenance and operations plan ("the Plan") for this project. If the BMPs implemented with this project include proprietary products that require regular replacement and/or cleaning, Developer shall provide proof of a contract with an entity qualified to provide such periodic maintenance. The property owner is responsible for the long-term maintenance and operation of all BMPs included in the project design. Upon request by City, property owner shall provide written proof of ongoing BMP maintenance operations. No grading or building permit shall be issued until the Development Services Manager approves the Plan and Developer provides an executed copy of the City’s stormwater covenant with the Plan included as an exhibit for recordation by the City (DS-82).
126. Developer’s stormwater quality control measures maintenance and operations plan shall include: 1) Requirement to clean on-site storm drains at least twice a year; once immediately before the first of October (the beginning of the rainy season) and once in January. The City Engineer may require additional cleaning; 2) Requirement to maintain parking lots free of litter and debris. Developer shall sweep sidewalks, drive aisles, and parking lots regularly to prevent the accumulation of litter and debris. When swept or cleaned, debris must be trapped and collected to prevent entry into the storm drain system. Developer may not discharge any cleaning agent into the storm drain system; 3) Requirement to label all on-site storm drain inlets with the message "Don't Dump Drains to Ocean" in accordance with City standards (DS-83).
127.Developer’s engineer shall submit written confirmation that the project landscape drawings comply with the landscape requirements of the Technical Guidance Manual for Stormwater Quality Control Measures for all landscape based stormwater quality best management practices (DS-84).
128.Developer shall provide pre-treatment for all infiltration based stormwater quality Best Management Practices (“BMPs”). Pre-treatment devices must effectively reduce 886
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 24 of 31 ends

sediment load entering infiltration BMPs to minimize occlusion of underlying soils and reduce long term maintenance requirements and thereby maintain the infiltration capacity of the BMP. 2011 TGM compliant pre-treatment such as vegetated swales are an approved form of pre-treatment. Proprietary pre-treatment devices must be capable of removing 80% of 50 micron particles to be considered adequate pre-treatment. Typical catch basin inserts do not provide the sufficient sediment storage to provide pre-treatment (DS-85).
129.Prior to issuance of a grading, building or demolition permit and prior to commencement of any clearing, grading or excavation, Developer shall prepare a Local Stormwater Pollution Prevention Plan (“Local SWPPP”.) The Local SWPPP shall be developed and implemented in accordance with requirements of the Ventura Countywide MS4 Permit.

The Local SWPPP shall be approved by the City Engineer prior to issuance of a site improvement/grading permit. Developer shall keep the Local SWPPP updated to reflect current site conditions and a copy of the Local SWPPP shall be kept onsite and available for City or designated representative to review upon request (DS-87).

DEVELOPMENT SERVICES DIVISION SPECIAL CONDITIONS
130.The Developer shall prepare a dedicated engineering site plan depicting property lines, right-of-way, and existing and proposed easements (DS). 131.Developer shall reconstruct the two existing driveway approaches to City Standard Plate 116. Each new driveway shall have a 5-foot pedestrian path of travel behind the driveway apron that meets Americans with Disabilities Act (ADA) standards (DS). 132.If the pedestrian path of travel at the driveway apron is constructed beyond the existing public right-of-way, Developer shall grant to the City a sidewalk easement for the full width of the pedestrian path (DS).
133.ADA compliant path of travel around the exterior of the building, (except for crosswalks), shall be elevated and separated from the vehicular traffic area (DS). 134.ADA and Electric Vehicle (EV) parking spaces not affecting sidewalks shall be 18-feet deep minimum without wheel stops with 1-foot vehicle overhang. Alternatively, these parking spaces can be 19-feet deep with wheel stops placed at the 17-foot mark (DS). 135.Standard parking stalls shall be 19-feet deep or 17-feet with a 2-foot overhang. Where the 17-foot deep parking stall depth is used, the entire parking stall shall be kept clear from all obstructions, including landscape curbing (DS).
136.Developer shall construct a minimum 7-foot wide sidewalk at locations where the sidewalk is located at the front of vehicle parking spaces to accommodate for 2-feet of vehicular overhang. Sidewalks in all other locations shall be a minimum of 5-feet wide (DS).
887
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 25 of 31 ends

137.The project is a redevelopment project on an existing commercial site with more than 1 acre. Developer shall design the stormwater facilities to meet the stormwater requirements of the Los Angeles Regional Water Quality Control Board’s municipal separate storm sewer system (“MS4”) permit (Order R4-2010-0108 including all revisions) redevelopment project (DS).
138.During the engineering plan check, the Developer shall conduct at least one (1) percolation test within the general footprint of the proposed infiltration facility to validate the infiltration rate used in the sizing calculations. The infiltration test shall account for the Reduction Factor from the Los Angeles County "Guidelines for Design, Investigation, and Reporting for Low Impact Development Stormwater Infiltration" published in the Administrative Manual of the County of Los Angeles Department of Public Works (DS). 139.Developer’s Geotechnical Engineer shall perform percolation tests on the exposed bottom of all infiltration chambers immediately prior to facility construction and provide the City with an opinion that the exposed soil layer is suitable for the proposed infiltration facility based on the review of the existing geotechnical reports, percolation tests, infiltration facility design, and characteristics of the exposed soil layer. This requirement shall be clearly noted on the improvement plans. The report shall be reviewed and approved by the Project Civil Engineer (DS).
140.The site drainage shall be designed to maintain the pre-existing drainage pattern. No alteration of drainage pattern is allowed unless approved by the City Engineer (DS). 141.Developer shall install ‘Full Capture System Devices’ (“Devices”) certified by the State Water Resources Control Board Executive Director in compliance with the Statewide Trash Amendments (“Amendments”) to treat all stormwater runoff from this site that meets the definition of ‘Priority Land Use’ as defined by the Amendments at the time of issuance of a grading/site improvement permit. The Devices shall be sized and designed in accordance with the requirements of the Amendments and the Technical Guidance Manual for Stormwater Quality Control Measures. The location of the trash device is subject to the approval of the City Engineer (DS).
142.In accordance with City Code, Developer shall provide separate services and water meters for commercial and irrigation (DS).
143.Developer shall construct a loop water system by extending the existing City water main on North Oxnard Boulevard to the second driveway entrance at Orchard Place. The entire width of the traffic lanes affected on North Oxnard Boulevard by the water main extension shall receive a 2-inch grind and overlay. Any lanes disturbed or damaged by construction shall be restored to full width. The design is subject to review and approval of the City Engineer and the Fire Department. Before permit issuance, Developer shall dedicate a 15-foot water easement meeting City standards to the City (DS). 144.Unless the Environmental Resources Division requires otherwise, each trash enclosure shall be large enough to store three (3) 4-yard bins. No objects other than refuse bins may 888
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 26 of 31 ends

be stored in the enclosure without the written permission of the Environmental Resources Division (DS).
145.Developer shall finish the trash enclosure to match the major design elements of the main structure, subject to approval by the Planning Division. The design of the trash enclosure shall meet the latest City requirements that include a solid non-combustible roof that prevents stormwater from entering the refuse bins. The design shall also include architectural mesh between the top of the wall, gates or doors, and the ceiling (DS). 146.An accessible path of travel shall connect the trash enclosure to the nearest site pedestrian walkway. Developer shall construct the floor and a loading/service pad of the trash enclosure to be substantially level (2% maximum slope). The concrete apron along the length of the trash enclosure opening shall extend a minimum of 15-feet from the face of the enclosure (DS).
147.At plan check, a new fire flow test involving two flowing hydrants out of the 2.5-inch nozzles is required. Using the approved fire flow data, Developer shall prepare a fire flow model and demonstrate that new fire hydrants will be able to deliver the required fire flow and pressure to meet the Fire Department requirements (DS). 148.Prior to permit issuance Developer shall verify that the existing sewer lateral is adequate to serve the proposed project. At a minimum a sewer technical memo shall be submitted to the City Engineer for review and approval (DS).
149.The design of the water system shall locate the public water pipeline in the drive aisle and not under the parking stalls (DS).
150.The public water pipeline shall not be constructed under wall foundations and structural footings. Wall foundations and structural footings shall not be constructed within the 15-foot water easement and shall not surcharge the public water pipeline. The design of any walls or foundations shall assume the full excavation of the public water pipeline within the easement area. The design is subject to review and approval of the City Engineer (DS).
151.Design the project layout to provide a pedestrian accessible path connecting the building to the equipment staging area north of the project site (DS). 152.The City carries out road resurfacing projects annually, and this project may overlap with the resurfacing project at the time of construction. This project shall coordinate and collaborate and allow the City’s street paving operations to take priority should two projects overlap during construction. The project shall be required to pave any street sections along the project frontages if this project is unable to allow the City’s street paving to carry out the full extent of the work (DS).
153.For public streets and alleys, the project shall use recycled materials to the extent feasible and cost-effective per Caltrans standard specifications adopted in 2018, meeting the 889
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 27 of 31 ends

requirements of AB 2953. Recycled materials include: (1) Recycled base and subbase materials as set forth in Sections 25-1.02 and 26-1.02 of the Caltrans standard specifications; (2) Reclaimed asphalt pavement and other materials in asphalt as set forth in Section 39-2.02B of the Caltrans standard specifications; (3) Reclaimed aggregate, fly ash, returned plastic concrete, and other materials in concrete as set forth in Sections 90-1.02, 90-2.02, and 90-9 of the Caltrans standard specifications (DS).

TRAFFIC DIVISION CONDITIONS
154.Developer shall install a new traffic signal system at the intersection of Orchard Place and North Oxnard Boulevard. The signal system design and the onsite and street signage and pavement marking improvement plans shall be submitted to the City for review and approval before building occupancy. In the event that the City of Oxnard completes the design and construction of the signal system or roadway improvement projects over the same intersection or construction area, Developer shall update the traffic signal system design and improvement plans accordingly to accommodate the City’s project that has completed design and/or construction prior to the Developer having final approval of project’s signal system and road improvement plans. Developer agrees to prioritize the City’s project if the two projects overlap in either design and/or construction (TR). 155.Developer shall construct a pedestrian path of travel that is ADA-compliant between the project site and the west side of North Oxnard Boulevard at the intersection of North Oxnard Boulevard and Orchard Place. The design of the pedestrian path shall include crosswalks and ADA curb ramps (TR).
156.Developer shall install the proposed bike rack close to the main entrance door of the proposed development. Developer shall be responsible for the perpetual upkeep of the proposed bike racks for the project. Final location shall be approved by the City Traffic Engineer (TR).

ENVIRONMENTAL RESOURCES DIVISION
157. A Construction and Demolition Waste Management Plan (ERDC-1) must be submitted to the Environmental Resources Division for review and approval prior to issuance of a building permit establishing a goal that at least 65% of the waste generated on the project will be diverted from the landfill.
158. After completion of construction and prior to a certificate of occupancy being issued, a Construction and Demolition Waste Management Report (ERDC-2) must be submitted that demonstrates that at least 65% of the waste generated on the project has been diverted from the landfill. This Report must also include legible copies of weight tickets, receipts, or invoices for materials sent to disposal or reuse/recycling facilities. 159. An Occupancy Plan must be submitted to the Environmental Resources Division prior to issuance of a certificate of occupancy. The Plan must clearly state how all three waste 890
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 28 of 31 ends

streams will comply with all applicable state laws, including AB 939, AB 341, AB 1826, and SB 1383, and any subsequent legislation adopted in the future, will be managed on site in perpetuity.
160. Any/all organic waste that is generated must be diverted from landfill disposal, as material of this type is not allowed in a trash dumpster. If landscaping is performed by an entity other than the City of Oxnard (i.e. self-haul or third party private hauler), the landscape service providers must be informed, in writing, of this condition and the property management must complete and submit an Alternative Services Certification annually.
161. Any new or renovated waste enclosures must be sized so that they can accommodate all three waste streams and meet minimum safety and operational requirements, including vehicle path of travel, employee access, and prevention of illegal dumping and/or vandalism. Use the City’s approved Standard Plates, but modify dimensions accordingly. 162. Developer shall arrange for materials collection during construction, demolition, and occupancy with the City's Environmental Resources Division or Developer shall arrange for self-hauling. Regardless of hauling methods, all materials collected must be conveyed to the Del Norte Regional Recycling and Transfer Station. 163.Developer shall dispose of sewage and solid waste from the project by City’s wastewater and solid waste systems in a manner approved by the City Engineer.

FIRE DEPARTMENT CONDITIONS
164.Developer shall construct all vehicle access driveways on the project property to be at least 26 feet wide, exclusive of shoulders. Developer shall mark curbs adjacent to designated fire lanes in parking lots to prohibit stopping and parking in the fire lanes.

Developer shall mark all designated fire lanes in accordance with the California Vehicle Code (FD/B, F-1).
165.All roof covering materials on the project property shall be of non-combustible or fire retardant materials approved by the Fire Chief and in compliance with the City Code (FD, F-2).
166.Before the City issues building permits, Developer shall obtain the Fire Chief’s approval of a plan to ensure fire equipment access and the availability of water for fire combat operations to all areas of the project property. The Fire Chief shall determine whether or not the plan provides adequate fire protection (FD/DS, F-3). 167.At Developer’s expense, Developer shall obtain two certified fire flow tests for the project property. The first test shall be completed before City approval of building plans and the second shall be completed after construction and prior to the issuance of a certificate of occupancy. The tests must be certified by a mechanical, civil, or fire protection engineer. Developer shall obtain permits for the tests from the Engineering 891
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 29 of 31 ends

Division. Developer shall send the results of the tests to the Fire Chief and the City Engineer (FD/DS, F-4).
168.All structures on the project property shall conform to the minimum standards prescribed in Title 19 of the California Code of Regulations (FD, F-5). 169.The project shall meet the minimum requirements of the “Fire Protection Planning Guide” published by the Fire Department (FD, F-6).
170.At all times during construction, Developer shall maintain paved surfaces capable of handling loads of 76,000 pounds which will provide access for firefighting apparatus to all parts of the project property (FD/DS, F-7).
171.Developer shall identify all hydrants and fire protection equipment on the project property as required by the Fire Chief (FD, F-8).
172.Developer shall install security devices and measures, including walkway and vehicle control gates, entrance telephones, intercoms and similar features, subject to approval of the Police Chief and the Fire Chief. Vehicle control gates shall be operable by City approved radio equipment (FD/PD, F-9).
173.Developer shall provide central station monitoring of the fire sprinkler system and all control valves (FD, F-10).
174.The turning radius of all project property driveways and turnaround areas used for emergency access shall be approved by the City Traffic Engineering Department (FD, F-11).
175.Developer shall provide automatic fire sprinklers as required by the City Code and shall contact the Fire Chief to ascertain the location of all connections (FD, F-12). 176.Developer shall install in each structure in the project an alarm system with a central station monitor that will automatically notify the Fire Department in the event of a fire in the structure. The alarm system shall include a UL or State Fire Marshal approved device, which shall not exceed design specifications, that reports the location of the fire and provides floor by floor water flow monitoring and allows the central station monitor to inform the Fire Department (FD, F-13).
177.All signalized intersections shall be equipped with pre-emption equipment (FD/TR, F15). 178.Developer shall comply with Certified Unified Program Agency (CUPA) requirements regarding the storage, handling and generation of hazardous materials or waste. Prior to the issuance of building permits, Developer shall contact the CUPA division of the Fire Department to ensure that such requirements are followed (FD, F-16).

FIRE DEPARTMENT SPECIAL CONDITIONS
179.Areas designated by the Fire Marshal as Fire Lanes shall be identified by a red curb and signage per the California Department of Motor Vehicles. 892
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 30 of 31 ends

180.All landscape on project property will coordinate with the fire protection features, to prevent access problems to fire protection features.
181.Fire hydrants shall be operational and accessible at all times. No parking, storage or staging of equipment/supplies shall be located within 15 feet on either side of fire hydrants. Prior to final inspection, blue reflective hydrant location markers shall be placed on the access roads in accordance with Fire Department standards. 182.Class I standpipe is required in each stairwell and reach 150’ of travel throughout the building.
183.Fire sprinkler coverage is required for:
a. Patios, overhangs or any other projections that are 48” or more from the structure. b. Open areas beneath stairs that serve a habitable space or when that area is accessible for storage or has mechanical equipment.
c. The protection of the forced air unit when located in the attic or other areas that are normally inaccessible.
184.Before the city issues a certificate of occupancy, the developer shall install a Knox key vault at a location to be determined by the Fire Department. 185.Gurney size elevators will be required.
186.All overhangs over 4 feet are required to be sprinklered. 187.Verify height of parapet. Not to be over 40 inches, unless approved by the Fire Department.
188.FDC is required to be within 50-feet of the fire hydrant and not across drive isles. 189.Vegetation clearance from structure(s) required prior to construction. 190.A minimum 20-foot clear width and 13 foot, 6 inch (13’-6”) clear height emergency access shall be maintained free of obstructions at all times within the development once construction starts.
191.Developer shall assess the need for in-building, two-way emergency responder communication coverage for emergency responders.
192.A permit application for design to accommodate high-piled storage shall be completed with plans and specifications of the stored material and approved prior to Occupancy. 893
City Council Resolution No. _________
PZ 17-500-11; U-Haul Project
March 4, 2024

Page 31 of 31 ends

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Oxnard on this 4th day of March 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

ATTEST:

John Zaragoza, Mayor
________________________________
Rose Chaparro, City Clerk
APPROVED AS TO FORM:
___________________________________
Stephen M. Fischer, City Attorney
894
2420 Oxnard Boulevard U-Haul
Project
1 City Council
March 4, 2024
Planning & Zoning Permit No. 17-500-11
Joe Pearson II, Planning Manager
Jeff Pengilley, Community Development Director
895
• The original project was scheduled for the April 13, 2023 City Council meeting. Staff's recommendation was to deny the application. • As a result of staff’s recommendation, the applicant team opted to pull the item from the agenda, to make modifications to the project to address concerns raised by the staff, Planning Commissioners, and the public. • Project Description (PZ 17-500-11 - Special Use Permit) • Allow for mini-warehouse/self-storage, warehouse, truck and equipment rental uses.
• Allow the renovation and conversion of an existing one-story (34 feet in height) 152,542 square foot warehouse into a three story (no change in height), 202,741 square-foot mini-warehouse/self-storage space. • U-Box Storage warehouse (34,537 square-feet).
• 3,050 square feet of retail space (New).

Executive Summary
2 896
• Mini-warehouse/self-storage, warehouse, and truck and equipment rentals are not allowed uses within the C-2 zone.
• Previous project request included recreation vehicle storage, which is also not allowed in the C-2 zone. This use is no longer included in the project description.
• In order to allow for these requests, the City Council must make a determination that each of the proposed industrial uses, except for the retail use, are consistent with the intent of the General Commercial (C-2) zoning designation and the Commercial General (CG) land use designation.

Executive Summary
3 897
Public Notice
• CEQA Notice was published in the newspaper.
• Planning Commission Meetings held November 17, 2023, January 5, 2023, and February 2, 2023.
• City Council Meeting Scheduled for April 13, 2023 (Item pulled by applicant).
• Notice of the March 4, 2024 City Council hearing was provided:
• Newspaper
• On-site posting; and
• Mailed to property owners within 300 feet
4 898
Project Location
5 Oxnard Blvd (Northbound)
Oxnard Blvd (Southbound)
899
Aerial-View
Project Location: 2420 N. Oxnard Boulevard
6 Project Location
Reference North

LOCATION GENERAL PLAN ZONING EXISTING LAND USE
Project Site Commercial General
(CG)
General Commercial,
Planned Development
(C-2-PD)
Warehouse and Showroom
North Commercial General
(CG)
General Commercial,
Planned Development
(C-2-PD)
Southern Pacific Railroad tracks; grocery
store and retail
South Commercial General
(CG)
General Commercial,
Planned Development
(C-2-PD)
West Vineyard Avenue; Mixed commercial
and retail and auto repair
East Commercial General
(CG)
General Commercial,
Planned Development
(C-2-PD)
Esplanade Drive; Southern Pacific Railroad
tracks, grocery store and retail
West Residential Medium
High (RMH)
High Rise Residential,
Planned Development
(R-4-PD)
Oxnard Boulevard; Southbank Residential
Neighborhood and Casitas Apartment
Homes
900
General Plan & Zoning Maps
Commercial General (CG)
General Plan Land Use Designation Zoning Designation
General Commercial - Planned Development
(C-2-PD)
7 901
Environmental Review
• An Initial Study/Mitigated Negative Declaration was prepared pursuant to the requirements of the California Environmental Quality Act (CEQA) to evaluate potential environmental impacts of the proposed Project.
• Final IS/MND includes a Mitigation Monitoring and Reporting Program:
a. Details process to implement required mitigation measures b. After implementation of standard conditions and mitigation measures, all potentially significant impacts reduced to less than significant levels • Final IS/MND identified the following:
a. Class 2 impacts (potentially significant by mitigable, mitigation required) i. Air Quality
ii. Biological Resources
iii. Cultural and Tribal Cultural Resources
b. All other impact area were identified as Class 3 (less than significant) • Staff determined that there is no substantial evidence that the Project will have a significant effect on the environment. The proposed project changes would not alter these findings, as the proposed scope of work remains the same.
8 902
Planning Commission
• In 2019, the Community Development Director indicated to the Applicant team that staff was not likely to support the use, which had continued to change since their 2017 submittal.
• In 2020, after additional meetings between the Applicant team and City, Staff indicated they would not provide a recommendation to the Planning Commission on the proposed request.
• Discussion ensued regarding the appropriateness of the proposed use, traffic, solar requirements, and potential for alternative uses. • The Commission requested additional clarification on the sales and property tax generation numbers provided by the applicant and direction on possible solar requirements and continued the item to December 15, 2022. 9 903
Planning Commission (Cont.)
• At the December 15th meeting, the item was continued to the January 5th, 2023 meeting to allow more time to gather the information. • On January 5, 2023, the Planning Commission received and reviewed the requested additional information from the project applicant and staff. • The Planning Commission considered the Project and following Commission deliberation, adopted a motion of Intent to recommend approval of the Project.
• On February 2, 2023, the Commission voted 5-1 (with one commissioner absent), to adopt a resolution recommending approval of the Special Use Permit to City Council.
10904
Project Concerns and April 13, 2023 City Council Meeting 11 Prior to the hearing, and during the Planning Commission meeting, the primary concerns raised were related to:
● Appropriateness of the Uses Proposed.
● View Corridors.

For these reasons, along with other issues related to the lack of compliance of U-hauls existing operations, at the April 13, 2023 City Council meeting staff's recommendation was to deny the application.

As a result of staff’s recommendation, the applicant team opted to pull the item from the agenda, to allow for time to work with City staff to address the City’s concerns.
905
Appropriateness of the Uses Proposed
12 ● In the consideration of this project, the City Council must consider the appropriateness of each of the proposed uses, as they relate to the intent of the C-2 zone and CG land use designation. ● The Commercial General land use designation allows retail centers and free-standing commercial uses along arterials. The intent of the C-2 zone is primarily to allow for retailing, office and service-related uses, as well as residential.
● With the exception of the retail aspect of the project, the applicants requested uses are currently only permissible in the City's industrial zones.
906
Primary Project Changes
13 ● Improved Architecture and Landscaping - The applicant modified the proposed architecture to provide additional design details as well as provide for increased landscaping along Oxnard Boulevard.
● Elimination of the RV Storage - The proposed RV Storage was removed from the proposed requests.As a result of the removal of the RV Storage aspect of the project, the truck and equipment storage area was able to be relocated to the northern portion of the site.
● Improved screening and relocation of the Truck and Equipment Rentals - The proposed fence screen has been upgraded to a screen wall designed to look like an extension of the building. This change was made to address concerns regarding the visual impacts of the project on Oxnard Boulevard which is a designated scenic corridor.
907
Revised Architecture
14 Original Elevation
Proposed Elevation
908
Revised Landscaping
15 Original Frontage Area
Proposed Frontage Area
909
Proposed Site Plan (Southern Section)
16 Proposed Site Plan
910
Original Site Plan (Northern Section)
17 Proposed Site Plan
RV
Storage
Rental
Staging
Area
911
Proposed Site Plan (Northern Section)
18 Proposed Site Plan
Rentals
Staging
Area
Customer
parking
912
Existing U-Haul Retail Location
19 Located at 3020 Saviers Road,
Oxnard, CA
913
Screen Wall Elevations - Rendered
20 Prior Proposal
Current Proposal
914
View of Northern Section from Orchard
21 Rental Equipment
Staging Area
Customer
Parking
915
Zoning Code Compliance - Mini-warehouse/Self-storage Uses 22 • In 1975, the City Council passed Resolution 6446, which established development standards for mini-warehouses. This resolution stated that "Mini-warehouses may locate in C-M (Commercial - Manufacturing) and M-1 (Light Industrial), M-L (Limited Industrial) Zones.”
• In 2009, the City Council passed Ordinance 2807, which removed mini-warehouses as a permitted use in the C-2 zone. At that time, the City determined that the general allowance of self-storage facilities was not consistent with purpose and intent of the General Plan for the C-2 zone and the use is not consistent with the other retailing, office and service-related uses permitted or conditionally permitted in the C-2 zone. This change was processed as a “clean-up” action to make the Oxnard City Code language consistent with the mini-warehouse policies adopted by the City Council in 1975 and the General Plan.
916
Financial Impact
• Allowing for the redevelopment of the project site is anticipated to generate additional sales and property tax revenue that would positively benefit the City’s General Fund.
23917
City Council Recommendation
1) Conduct a public hearing, and
2) Adopt a resolution adopting a Mitigated Negative Declaration (MND) 22-04 and Mitigation Monitoring Reporting Program (MMRP); and 3) Adopt a resolution approving Planning and Zoning Permit No. 17-500-11 (Special Use Permit), based on the findings presented and attached conditions of approval.
24918
25 919

CITY COUNCIL AGENDA REPORT

REPORTS
AGENDA ITEM NO. N.1
DATE: March 4, 2024
TO: City Council
FROM: Michael Wolfe, Public Works Director, (805) 385-8055, [email protected] SUBJECT: Environmental Resources (Solid Waste) Rates Update Report. (20 minutes)

RECOMMENDATION
That the City Council receive and file the Solid Waste Rates Update Report. (As of the date of this City Council agenda being posted, there is not yet an outcome from the February 27, 2024 Public Works and Transportation Committee. Staff is available to answer any questions).

Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/4ZzhKVZ5c8o

BACKGROUND
At the December 5, 2023, City Council meeting, an agenda item was presented with solid waste rate scenarios. At that meeting, staff and the City’s solid waste rate consultant (Raftelis) discussed topics including the rate-setting process, legal requirements, financial planning, solid waste cost of service, and rate design. Four solid waste rate scenarios developed by Public Works staff and Raftelis were discussed extensively with the City Council.

DISCUSSION
At the December 5, 2023, City Council meeting, the City Council provided their feedback and recommended Scenario 3: Rate Adjustments and Full Capital Expenditures. Scenario 3 fully funds the projected revenue requirements with greater near-term rate adjustments, but lower overall increases over the five-year rate adjustment period compared to Scenario 4. (Please see the attached staff report from December 5, 2023, with additional information about the scenarios presented to the City Council.) Public Works staff proceeded with the City Council’s recommendation and directions as follows:

1. Scenario 3, projects all funding requirements including operating, capital, and proposed capital lease and debt payments. The key assumptions include:
i. Fiscal Year 2023/2024 Served as the baseline for the Rate Study Period as adjusted for actual operating results and known cost increases;

1. The operating expense growth is estimated at 4.2% per year; ii. Assumes some additional collection routes to maintain regulatory compliance with AB1826, AB827, SB1383, and regular service demands;
iii. Assumes Infrastructure Use Fee (IUF) repayments from the City to ER ends in Fiscal Year 2024; iv. Assumes resumption of IUF payments in Fiscal Year 2025 to the City; v. $40.7M reinvestment to MRF including new equipment and roof Fiscal Year 2026 - Fiscal Year 2028 vi. Replacement of vehicles at end of life in Fiscal Year 2024/2025 vii. Compliance with CARB Zero Emissions Vehicle Requirements 920

1. Primarily relies on use of capital leases and debt to fully fund capital expenditures viii. Represents necessary rate adjustments to fund a fiscally sustainable operation and maintain regulatory compliance, and;

2. Proceed with creating and sending the required Proposition 218 notices to all solid waste customers and property owners.

3. Target a rate-setting public hearing and the introduction of a new ordinance containing the proposed solid waste rates at the City Council meeting on March 19, 2024.

4. Plan on adopting the Ordinance at the City Council meeting on April 16, 2024.

Final Cost of Service:

During the December 5, 2023, Council discussion about rates, staff reiterated that they were preliminary, with actual rate changes for individual customers dependent on the final cost-of-service analysis. The cost-of-service analysis is complete and is available online at: www.oxnard.org/refuserates
The table below represents a comparison of the preliminary estimated residential rates (three 96-gallon cart service) presented to Council on December 5, 2023, and the final rates included in the Prop 218 notice:

Service Type FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Presented to Council 12/5/23
Monthly Rate - 3
Cart Service with
96-gallon refuse
cart
$46.17 $49.86 $52.60 $55.23 $56.89
Prop 218 Notice
Monthly Rate - 3
Cart Service with
96-gallon refuse
cart
$47.41 $52.11 $54.83 $56.46 $56.89
Difference
Change in
Proposed
Monthly Bill
$1.24 $2.25 $2.23 $1.23 ($0.00)
The cost of service study is also attached to this staff report. The report provides three primary objectives:

1. Develop a financial plan for the ER Fund to ensure financial sufficiency, meet operations and maintenance costs, provide funding for capital replacement and renewal (R&R) needs and improve the financial health of the enterprise;

2. Review the current rate structure for the ER Fund and propose recommended changes based on the cost of service; and

3. Perform a cost allocation and prepare a recommended five-year schedule of rates and fees for the ER Fund.

Schedule:
921
The upcoming rate-setting Public Hearing and introduction of the proposed solid waste rate ordinance is scheduled for March 19, 2024. These proceedings are consistent with the requirements of Proposition 218 and include the notice, mailed to the required recipients, pursuant to the timeline required by the State. Furthermore, the City has adopted Resolution Number 14,877 (adopted in 2015), which outlines the procedures for establishing and increasing fees and charges under Proposition 218 (Resolution attached for reference). The proceedings for any solid waste rate increase will be consistent with the requirements outlined in this Resolution. The Proposition 218 notices were mailed out to all property owners of record and solid waste customers (a Prop 218 notice is attached to this staff report).

Outreach:

In addition to the November 14, 2023, Public Works and Transportation Committee meeting and the December 5, 2023, City Council meeting, four community meetings were planned and three have already been held on the following dates:
• November 15, 2023, at the South Oxnard Library
• December 13, 2023, at the City Council Chambers
• January 30, 2024, at the City Council Chambers
The fourth community meeting at the South Oxnard Library is scheduled for February 29, 2024. This will be an in-person town-hall style meeting. Additionally, staff will attend the March 6, 2024, Inter-Neighborhood Council Organization (INCO) meeting to provide a brief summary of the rates.

STRATEGIC PRIORITIES
This agenda item supports the Infrastructure and Natural Resources strategy. The purpose of the Infrastructure and Natural Resources strategy is to preserve and improve our roads, utilities, parks, trees, water supply and natural resources through effective planning, prioritization, and an equitable and efficient use of available funding.

FINANCIAL IMPACT
There is no financial impact from receiving this Solid Waste Rates Update Report.

COMMITTEE OUTCOME
As of the date of this City Council agenda being posted, there is not yet an outcome from the February 27, 2024 Public Works and Transportation Committee. Staff is available to answer any questions.

Prepared by: Brian Yanez, Assistant Public Works Director

ATTACHMENTS

1. December 5, 2023 Staff Report

2. Oxnard-ER-Cost-of-Service-Study-Report

3. Oxnard-Solid-Waste-Proposition-218-Notice

4. Presentation
922

CITY COUNCIL AGENDA REPORT

REPORTS
AGENDA ITEM NO. M.2
DATE: December 5, 2023
TO: City Council
FROM: Michael Wolfe, Public Works Director, (805) 385-8055, [email protected] SUBJECT: Solid Waste (Refuse) Rates Discussion. (50 minutes)

RECOMMENDATION
That the City Council:

1. Provide comments and feedback on the goals, variable input, preliminary scenarios, and the process and timeline for solid waste rates; and

2. Direct staff to move forward to the next steps in the rate setting process on the basis of Scenario 4. (Public Works and Transportation Committee approved 2-0) Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/- SNEvyuWTKM
Live presentation to be provided by a consultant.

BACKGROUND
Executive Summary
The City’s Public Works Department Environmental Resources Division (ER) is an enterprise fund operation that provides Municipal Solid Waste (MSW) services to Oxnard residents and businesses, which includes collection, sorting, processing, and disposal for 34,154 residential properties and 16,378 commercial customers (includes apartment buildings) six days a week. Services include collection, sorting, transportation, and transferring material to the landfill to foster a clean, safe, and sustainable Oxnard. To provide our services while meeting all Local, State, and Federal requirements, ER:
• Recycles approximately 12,918 tons of material and 14,177 tons of organics (green waste & food waste); • Handles approximately 294,938 tons (589,876,000 lbs) of MSW annually; • Has a workforce of 179 essential workers fulfilling 529,443 hours per year; and • Has invested approximately $60 million in capital equipment, facilities, and land including the Del Norte Regional Recycling and Transfer Station and approximately 138 vehicles (109 heavy-duty trucks & 29 small vehicles)
The last time the City Council approved a cost of service analysis for ER was in May 2012, with a rate increase effective January 2013. Since January 2013 (when accounting for the removal of the Infrastructure Use Fee (IUF) in 2021) the residential rate (96-gallons) has gone from $30.15 to $30.78 per month and the most popular commercial rate (4-yard/once per week) has gone from $224.81 to $230.86 per month. This represents a 2.1% residential increase and a 2.7% commercial increase over 10 years. However, over that same decade, the consumer price index has increased by 33.9%.

Separate from rates, service fees (e.g. per ton for disposal of refuse, greenwaste, construction and demolition, and self923 haul disposal rates at Del Norte) increased in FYs 2012/13, 2016/17, 2018/19 for pass-through costs and decreased in FY 21/22 for the removal of the IUF.

Clearly, during the 2010’s, City Hall’s discombobulation on the heels of the District Attorney investigations into the prior decade’s activities, shocking financial audit findings, and frequent executive staff turnover had, at minimum, distracted City Hall from following best management practices, including the reviewing of rates every five years. In addition to that, the State has imposed many unfunded mandates on the solid waste industry, such as mandatory recycling and mandatory organics recycling waste programs, that require significant capital investment and operational costs not fully contemplated in previous rate studies.

Based upon the draft Fiscal Year 2023/24 cost-of-service study the ER division expenditures are anticipated to materially outpace revenues resulting in a negative ending cash balance no later than Fiscal Year 2024/25. The combination of minimal rate increases, unfunded State mandates, elevated inflation, and the need for significant capital investment to replace and rehabilitate assets is expected to result in a growing structural deficit.

Reliable and efficient solid waste service is a key component for the maintenance of solid waste services for the public health, safety, and welfare of the community. As mentioned, absent a rate adjustment, the draft cost-of-service study projects negative cash balances by FY 2024/25. Staff has provided some preliminary rate increase scenarios for discussion and consideration. Each of the scenarios assumes changes in key assumptions such as the level and timing of rate revenue adjustments, amount of capital spending, and proposed debt issuances. Based on the direction of City staff, several sensitivity analyses were performed such as examining the effects of no rate adjustment or no capital spending, among other sensitivities.

DISCUSSION
Cost of Service Study
As an industry best management practice, rates should cover the cost of providing services, establish an appropriate level of reserves, and a cost of service study (Study/Studies) should be performed every 3-5 years. This Study is critical to understanding the effectiveness and efficiencies of the operation and verifying existing rates are adequate, and providing a long-term path for the financing viability and sustainability for solid waste operations. The last ER Study was completed in 2012 and implemented in 2013. With respect to the solid waste industry in California, many things have changed over the past decade since this last review was completed. Operations must keep up with rising costs for goods and services, unfunded State mandates, and be able to implement critical capital outlay and projects that are mandated or necessary for the health and safety of our customers.

Performed regularly, Studies provide transparency into what the City can expect in the years ahead and ensure we have the financial resources to maintain our infrastructure, manage vehicles and equipment capacity for growth, implement new technologies, address existing and new state and federal regulations, and implement our capital improvement program (CIP). All of this is to provide reliable and safe service to our customers. The Study is the tool used to develop rates so that rates meet the cost of service plus the appropriate level of reserves.

Raftelis, placed under contract in December of 2022, is assisting the City with the calculations of the cost of service draft study and recommending changes to the current rates and fees structure.

Goals for the Cost of Service Study
When finalized, the cost of service study will determine the overall revenue adjustments and the total amount of revenue required from rates and fees to meet the cost of service over time. The revenue covers operating and maintenance (O&M), debt service, and capital expenses as well as reserve funding. Revenue adjustments represent the average rate increase for the City; rate changes for individual customers will depend on the cost of service analysis. Once complete, the Study will include rates and fees that promote and sustain a financially viable utility. As such, to provide guidance, staff in conjunction with Raftelis have relied upon identifying several goals in the development of preliminary rate options. These goals are important to consider when identifying rate-influencing items with variable options, such as a reserve fund balance target or Capital Improvement Program (CIP) projects. In general, the goals are to provide a safe, reliable, and sustainable solid waste service. Specific goals include:
924

1. Cover Operations and Maintenance Costs (O&M) - (G1)

2. Cover Capital Investments - (G2)

3. Legally Compliant - (G3)

4. Promote Financial Viability - (G4)

5. Community Values - (G5)

6. Provide Fairness and Equity - (G6)
Input and Considerations
The foundation of the Study and the primary objective of the solid waste rates are to reasonably recover the cost of providing service, the cost of infrastructure investment, implement known State unfunded mandates and comply with covenants of internal and external fiscal targets (referred to as the "Revenue Sufficiency" evaluation).

Ensuring adequate cash reserves and appropriate cash flows generally results in a sustainable long-term financial plan that can mitigate the financial and operating risk from unanticipated or sudden events to financial operations (e.g., changes in market conditions affecting operations and recovered materials revenues, reduced growth or tonnage, unanticipated or extraordinary expenses, unfunded mandates, etc.). The identified revenue requirements to be funded from rates are then allocated based on the type and level of service.

To assess the sustainability of the City’s charges for service, Raftelis developed a draft financial model capable of forecasting solid waste operations over a ten-year Rate Study Period but with the recommended rate revenue adjustment period comprising the Fiscal Years 2024/25 through 2028/29. By forecasting operations over this period of time we can capture funding requirements that may not be annually occurring, test sensitivity to potential changes in operations or costs, and examine projections of cash reserves and net revenue margins to evaluate compliance with formal and informal fiscal policies. Performing a thorough evaluation of the City’s funding requirements allows us to provide sound rate recommendations to help ensure the City has sufficient resources to fund operations and achieve its objectives. The following provides a brief overview of the key activities performed for the draft Study:

1. An evaluation of the service area requirements for the City was performed. This included a review of recent historical customers served and corresponding waste generation such that: i) a representative forecast of the Division’s needs from a financial standpoint could be prepared, and ii) a projection of rate revenues consistent with the projected service area needs could be developed.

2. Raftelis, with the support of City staff, analyzed a projection of the Net Revenue Requirements from rates and fees, which equates to the expenditure requirements funded from rates and fees. An illustration of the components that make up the Net Revenue Requirements is summarized below:
+ Cost of Operation and Maintenance
+ Debt Service (Vehicle Leases)
+ Indirect Cost Allocation and Administration Payments
+ Capital Funding Requirements
+ Deposits to Reserves for Policy Compliance and Future Expenditures – Other Operating Revenue
– Interest Income / Transfers from Operating Reserves
= Net Revenue Requirements (Funded from Rates and Fees)

3. The annual cost of providing solid waste service to City customers was determined by identifying the gross revenue requirements, netting out all other applicable revenues resulting in a net revenue requirement to be funded from the respective fees. The applicable equivalent unit billing determinants, as presented within the cost of service analysis of the draft report, will be used to determine the unit cost of service to be presented in the final report. It should be noted that the information reported herein is accurate to the best of our knowledge and is assumed to be reasonable for the purposes of estimating the cost of service with rate recommendations pursuant to the Proposition 218 Omnibus Implementation Act at Gov. Code 53750. In addition to recommending rates and fees, the intent of providing this information is to help support a general understanding of the City’s financial needs to support ER’s programs, operations, and services.
925

4. Based on the identified funding requirements and the draft cost of service associated with providing service over the Rate Study Period, provide preliminary rate recommendations to ensure adequate funding for the City’s needs and meet the City’s rate goals and objectives.

The following items are key components of developing the draft rate study and have a direct influence on the actual rates.

Staff has recommendations for each item, as noted. Because these factors influence any proposed rate change, staff is seeking feedback from the Public Works and Transportation Committee/City Council on each item separately. The summary of these factors with recommendations is listed below:

Factor Staff
Recommendation
Justification Goal(s)

1. Rate Study
Period
5-year period Industry standard;
long-range planning;
fairness of rates;
ensures planned
operations and
mitigates deferred
maintenance
G6

2. Pass-Through
Charge (to the
extent allowed
by State Code)
Include a passthrough for fees as
allowed by
California
Government Code
53736 (c)
Avoids over or
underestimating
factors outside the
City’s control (e.g.
disposal fees from
third-party vendors)
G4,
G5, G6

3. Capital
Improvement
Program (CIP)
and Capital
Outlay
Implement over an
extended period to
smooth rates;
leases extended to
7 years, CIP over
20 years
Allows for CIP
projects at a pace
within existing
resources; ensures an
operable and safe
facility; safe and
reliable equipment
and vehicles
G2, G4

4. Reserve Fund
Balance Target
Endeavor to
maintain 25% (per
Resolution 15595)
Consistent with City
Council Resolution;
provides a funding
source for
emergencies and bond
covenants (if/when
required) and strong
credit ratings
G1, G4,
G5

5. Debt Coverage
Ratio (when
applicable)
Ensure funding of
annual debt
service and capital
lease payments
Ensures the City is
not in default of
debt/lease repayment
obligations
G4, G5
The draft cost of service study has evaluated and considered all revenues from both rates and fees, among other revenues.

For purposes of this report and as referenced in the draft cost of service study, rate revenues are defined as the monthly property based charges for solid waste collection and disposal service that must follow the Proposition 218 noticing 926
requirements and process. Fees are defined as charges for solid waste services and while they do not require a Proposition 218 noticing procedure, they must be cost based and in compliance with Proposition 26.

Existing Rates and History (include a benchmark CPI theoretical scenario) The City Council approved a cost of service analysis last in May 2012, resulting in rate increases effective January 2013.

The authorized increases and decreases noted in the table below cumulatively represent a 2.1% increase in residential rates and a 2.7% increase in the most popular commercial rate since the last Study was approved and implemented in January 2013. However, over that same decade, the consumer price index has increased by 33.9%. The following tables provide the rate history for a residential customer (96-gallon cart):

Date Oct
2012
Jan 2013 Mar 2013 Jan
2014
Jan
2015
Jan
2016
Jan 2017
Residential Rate (96-
gallon)
$29.86 $30.15 $31.03 $31.03 $31.03 $31.03 $31.34
Total Change 0.0% 1.0% 2.9% 0.0% 0.0% 0.0% 1.0%
Notes Rate
Increase
PassThrough PassThrough
Date (cont.) Jan 2018 Jan
2019
Jan
2020
Jan 2021 Jan 2022 Jan
2023
Residential Rate (96-
gallon)
$31.88 $31.88 $31.88 $30.78 $30.78 $30.78
Total Change 1.7% 0.0% 0.0% -3.5% 0.0% 0.0%
Note PassThrough
IUF Reduced
The below graph shows the history of residential rates since 2012. The graph also includes a benchmark scenario, if rates were theoretically increased annually by the CPI (Los Angeles-Long Beach-Anaheim, California) at a minimum. 927
Note: Residential rates increased in FY 12-13, FY 16-17, FY 18-19 and decreased in FY 21-22, reflecting the IUF reduction.

Efficiency Efforts
The ER staff is entrusted with managing enterprise funds based on an annual budget approved by the City Council. The City is committed to investing in meeting local, state, and federal regulations, ensuring safe and reliable solid waste collection services, and providing excellent customer service to residents and businesses. ER has made significant investments totaling approximately $60 million to the Material Recycling Facility (MRF) at Del Norte Regional Recycling and Transfer Station and has acquired Compressed Natural Gas (CNG) automated collection refuse vehicles, replacing older vehicles to enhance efficiency and reduce costs.

ER staff actively informs residents and businesses about recycling programs and new organic recycling laws through various channels such as social media, billing inserts, radio broadcasts, and special events. Outreach and education staff are available to assist residents and businesses by providing information on recycling and mandated programs.

Despite efficient efforts to be cost-effective, the City needs rates that meet the actual cost to provide service. Oxnard Refuse customers pay less per person served for refuse service when compared to other nearby cities. The current average rate per person for trash service is compared with other agencies in the table below:
928
Challenges
There are many challenges ER faces with new and old unfunded Local, State, and Federal mandates. These include factors that are outside the control of the City (e.g. unfunded mandates and rising costs of labor, fuel, and disposal cost) and factors due to the post-pandemic (e.g. supply chain restrictions and increased cost to supplies and equipment). Another challenge is the aging vehicles, equipment, and infrastructure that need constant maintenance and repairs.

State Unfunded Mandates -
Several recycling and composting laws that took effect that had major financial and operational impacts on the solid waste collection system:

1. AB 341 Mandatory Commercial Recycling (MCR) – Adopted into California Law in 2012 and requires businesses that generate four or more cubic yards of commercial waste per week and multi-family complexes with five or more units to self-haul or subscribe to recycling services.

2. AB 1826 Mandatory Commercial Organics (MORe) – Effective January 1, 2016, and phases in the number of businesses and multi-family dwellings that are required to subscribe to commercial organic collection service.

3. AB 827 – Effective July 1, 2020, and expands upon requirements of MCR and MORe to include mandatory recycling and organics carts for businesses at the “front of house” (i.e. portion of the business open to the public) to collect waste generated by customers from products they purchase and consume on the premises.

4. SB 1383 Short-Lived Climate Pollutants (Organics Recycling) – Effective January 1, 2022, and requires jurisdictions to provide organic waste collection services to all residents and businesses so that they may divert all organic waste to a compost program.

Inflation -
Of significant importance is that the cost to operate a full-service solid waste operation is not immune to inflation. As noted above, the industry has observed significant increases to the cost of solid waste collection, operations, and disposal. 929
The U.S. Bureau of Labor Statistics measures garbage bill increases nationally through a subcomponent to CPI in the Garbage and Trash Index (G&T). The Garbage and Trash Index has increased by 20% since 2020. Raftelis calculated a weighted Producer Price Index (PPI) of the cost inputs to garbage collection service and estimated cost increases may be closer to 40% since 2020 due to labor, capital cost, and fuel cost increases.

The City’s previous solid waste cost of service analysis was last completed in 2012. Costs for goods and services have increased since that year and continue to do so while the refuse utility rates have only slightly changed (2.1% increase in residential rates and a 2.7% increase in the most popular commercial rate). In addition, recent State unfunded mandates have increased the costs of operations to avoid penalties and/or non-compliance actions by the State. This has led to a structural deficit and impacts ER’s financial stability. Without a rate increase, the draft rate model shows a negative cash balance in FY 2024/25.

Note: FY 22-23 Cash Balance base is unaudited and FY 23-24 and beyond are estimates and subject to change.

Aging Infrastructure and Equipment -
As noted above, the ER handles over 589 million pounds of municipal solid waste each year. This takes a significant amount of equipment and infrastructure. ER has 138 vehicles, including 109 large heavy-duty trucks. Additionally, the MRF houses sorters and other associated equipment related to recycling. The sorting equipment, which is key to the 6- day-a-week operations, is 27 years old and requires constant maintenance to keep up with the recycling, greenwaste, food waste, and residual trash, produced by residential, commercial, and industrial customers. Furthermore, the MRF building is 27 years old and houses ER’s administrative staff, conveyors, walking floors, and sorting equipment. The MRF needs 930
significant improvements including a new roof. Here are some examples of operating and capital costs to address this aging equipment and infrastructure:
• Average annual maintenance cost for trash truck (front-end loader) is $19,642 • Current price of a new trash truck (side-loader) is $339,053 (Purchase of zero-emission vehicles is expected to cost up to 200% more than the current price of a new CNG refuse vehicle) • Estimated roof replacement costs: $7.5 million
• Annual maintenance and repairs costs for sorting equipment (we have 31 sorting belt lines made up of conveyors, walking floors and one bailer) which can cost between $250K to $1.5 million per repair • Estimated cost for a like-for-like replacement of the MRF is $36 million (this estimate can fluctuate with the price of steel, metal, inflationary factors, and the consumer price index) Revenues and Expenditures
The revenue streams for ER have managed to remain relatively stable over time due to several key factors. One of the primary reasons is the consistent collection of solid waste services from both residential households and businesses within the city. Waste generation rates have remained relatively constant, ensuring a consistent flow of revenue for the city's solid waste programs (see table below). On average, revenues have averaged about $47 million per fiscal year. Most recently, revenue has been impacted by the decline in sales of recycled material due to the COVID-19 pandemic, market fluctuation, and new/increased regulations on the cleanliness of the material. All of the other revenues, including the two largest, residential and commercial collections, have remained consistent. This would be consistent with a relatively stable number of customers for residential and commercial accounts.

The largest contributing expenditures to the solid waste program primarily include costs related to waste collection, transportation, and disposal. These expenditures encompass various essential activities and services involved in managing the city's solid waste effectively. Here's a breakdown of key operating expenses:

1. Waste Collection Personnel: A significant portion of the budget is allocated to employing waste collection personnel, including drivers and crew members responsible for collecting waste from residential areas, commercial establishments, and public spaces.

2. Fleet and Equipment Maintenance: Maintaining a fleet of waste collection vehicles, including garbage trucks and recycling vehicles, is crucial for day-to-day operations.

3. Fuel: Refuse heavy-duty and fleet vehicles operate on CNG, diesel, and unleaded fuel.

4. Waste Transportation: The transportation of collected waste to appropriate disposal facilities, recycling centers, or composting sites. This includes fuel costs, vehicle maintenance, and fees associated with using disposal facilities.

5. Disposal Fees: Paying fees to landfill and waste disposal facilities for the final disposal of non-recyclable waste.

Landfill fees are often calculated based on the weight or volume of waste disposed of.

6. Recycling Programs: Funding recycling initiatives, including curbside recycling collection, recycling education campaigns, and the operation of recycling centers, is another significant expenditure. This includes costs related to sorting, processing, and transporting recyclable materials to recycling facilities.

7. Organics Recycling: With the implementation of organic waste recycling programs, costs associated with collecting and processing organic waste, such as food scraps and yard trimmings, contribute to the expenditures.

8. Compliance and Regulatory Costs: Meeting state and federal regulations related to waste management, including reporting requirements and environmental compliance, requires funding. Expenditures associated with ensuring adherence to these regulations are essential components of the solid waste program's budget. 931

9. Personnel Training and Safety: Providing training for waste management personnel and ensuring their safety through proper equipment and protocols. Safety measures are crucial to protect both the workers and the community as MRF processors, sorters, and workers are listed as the seventh most dangerous jobs in America.

10. Community Outreach and Education: Engaging in educational initiatives and outreach programs to inform residents and businesses about recycling practices, waste reduction, and proper disposal methods. This helps promote community participation and compliance with waste management guidelines.

ER’s expenditures have seen an increase over the past several years (see table below). In summary, the largest contributing expenditures to the solid waste program encompass waste collection personnel, fleet maintenance, waste transportation, disposal fees, recycling programs, organics recycling, compliance costs, personnel training, safety measures, and community outreach efforts. These expenditures are vital for ensuring efficient and environmentally responsible management of the city's solid waste.

Note: FYs 20-21 through 23-24 include revenue for payment to ER for the Infrastructure Use Fee which will end in FY 23-24. *1Forbes Advisor:https://www.forbes.com/advisor/legal/workers-comp/most-dangerous-jobs-america/ Rate Change Scenarios (Preliminary Calculations)
To provide revenue that will sustain critical operations and maintenance, debt service, and fund capital expenditures, an increase in rates is recommended. Raftelis began work on the cost of service draft rate study to develop a financial plan for the City’s solid waste utility that includes a ten-year rate model. Based upon the preliminary analysis, a rate adjustment is required to ensure full cost recovery of projected annual operating expenses, capital costs, and other factors including unfunded Local, State, and Federal mandates.

Updating the rates to keep up with the rising costs of providing safe and reliable services is a key component of maintaining the financial viability of the ER funds, including maintaining healthy fund balances/reserves for emergencies and applicable bond covenants (if/when required) and strong credit ratings. It is also more equitable since it looks at what customers should be paying based upon the level and type of service they receive.

To develop the financial plan, Raftelis estimated and projected annual expenses and revenues, existing and proposed debt service, modeled reserve balances, and added planned capital expenditures. The City is anticipating financing a portion of capital improvements through capital leases and debt. It is important to note that the draft cost of service study preliminarily calculates a net revenue loss for Fiscal Year 2023/24. Additionally, the draft cost of service study projects 932
that the structural deficit will continue in future years without an increase in rates.

Because of the projected deficit, staff has worked closely with Raftelis to develop a viable preliminary draft financial plan for the City’s solid waste fund. Due to the existing structural deficit in the ER Fund and the need for rate increases, the draft Study contemplates scenarios. The following scenarios are estimates and are not to be seen as fixed. These are being presented to show the sensitivity of the draft rate model to certain inputs and to initiate the conversation with the Committee Members/Councilmembers to provide comments and feedback.

Based on a collaborative effort among City staff and Raftelis several preliminary sensitivity runs and scenarios were identified and evaluated for comparison and discussion as follows:
o Model Sensitivity 1: No rate adjustment
o Assumes all identified funding requirements including operating, capital, and proposed capital lease and debt payments. Key assumptions include:
▪ Fiscal Year 2023/24 Served as Forecast Baseline as Adjusted for Actual Operating Results and known cost increases / operating expense growth estimated at 4.5% per year ▪ Assumes some additional collection routes to maintain regulatory compliance with SB1383 and service demands
▪ Assumes IUF repayments from the City to ER ends in FY 2023/24Assumes Resumption of IUF payments in FY 2024/25 to the City
▪ $43.7 million Reinvestment to MRF including new equipment and roof FY 2025/26-FY 2027/28
▪ Replacement of vehicles at end of life in FY 2024/25
▪ Compliance with CARB Zero Emissions Vehicle Requirements ▪ Primarily relies on use of capital leases and debt to fully fund capital expenditures o Recognizes no rate adjustments to assess the adequacy of existing fees to cover the cost of service o Model Sensitivity 2: Rate Adjustments and No Capital Expenditures o Assumes all identified funding requirements except excludes capital spending o Helps identify the necessary rate increases which are driven by the structural deficit among revenues and operating expenses.
o Scenario 1: Rate Adjustments and Reduced Capital Expenditures o Assumes all identified funding requirements except reduces capital expenditures including minimal spending for the MRF rehabilitation and only funding 50% of projected new vehicle fleet requirements.
o Includes an allowance for rebuilding vehicles to extend the service life and minimize capital expenditures.
o Represents a moderate capital spending scenario, but doesn’t fully address capital reinvestment needs of the system
o Scenario 2: Phased Rate Adjustments and Reduced Capital Expenditures o Builds off of Scenario 1, but assumes a $5 million interfund loan to assist ER in phasing the identified rate increases over three (3) years.
o Represents a moderate capital spending scenario with phased increases. o Scenario 3: Rate Adjustments and Full Capital Expenditures o Assumes all identified funding requirements as assumed in Model Sensitivity 1, including the full capital funding requirements.
933
o Represents necessary rate adjustments to fund a fiscally sustainable operation and maintain regulatory compliance.
o Scenario 4: Phased Rate Adjustments and Full Capital Expenditures o Builds off of Scenario 3, but assumes a $5 million interfund loan to assist ER in phasing the identified rate increases over three (3) years.
o Represents necessary rate adjustments to fund a fiscally sustainable operation and maintain regulatory compliance with phased increases.

Baseline Model Assumptions
Assumes all identified funding requirements including operating, capital, and proposed capital lease and debt payments.

Key assumptions include:
o Fiscal Year 2023/24 Served as Forecast Baseline as Adjusted for Actual Operating Results and known cost increases / operating expense growth estimated at 4.5% per year o Assumes some additional collection routes to maintain regulatory compliance with SB1383 and service demands o Assumes IUF repayments from the City to ER ends in FY 2023/24 o Assumes Resumption of IUF payments in FY 2024/25 to the City o $43.7 million Reinvestment to MRF including new equipment and roof FY 2025/26-FY 2027/28 o Replacement of vehicles at end of life in FY 2024/25
o Compliance with CARB Zero Emissions Vehicle Requirements o Primarily relies on use of capital leases and debt to fully fund capital expenditures. o Recognizes no rate adjustments to assess the adequacy of existing fees to cover the cost of service Model Sensitivity 1: No rate adjustment
The following charts present a forecast of the cashflow requirements relative to a projection of existing revenues. As can be seen, the solid green line presents the projected revenues under existing rates. A decline in revenues is observed in FY 2024/25 due to the final repayment of IUF reimbursement from the City. Conversely, IUF payments to the City are assumed to begin in the Fiscal Year 2024/25. Operating expenses represented as the blue stacked bars are projected to increase by approximately 4.5% per year on average.

Capital expenditures funded directly from revenues are reflected as the blue stacked bar for FY 2023/24. Debt service requirements are represented as the purple stacked bar and reflect the addition of both existing capital lease payments and proposed capital lease and debt service payments associated with the funding of $77.9 million in capital spending as shown below.
934
Assuming no rate adjustments ER system cash balances are estimated to fall negative by the Fiscal Year 2024/25 as shown below.

Model Sensitivity 2: Rate Adjustments and No Capital Expenditures Assumes all identified funding requirements pursuant to Model Sensitivity 1 except it excludes capital spending to help identify the necessary rate increases to address the structural deficit among revenues and operating expenses. The following charts present a forecast of the cashflow requirements relative to a projection of existing revenues. As can be seen in this scenario in contrast with Model Sensitivity 1, the forecast does not reflect any increase in debt service payments.
935
To fully fund the revenue requirements of the scenario the following rate adjustments were recognized:

Assuming implementation of the identified rate adjustments the City is expected to maintain compliance with the minimum reserve target equivalent to 25% of operating expenditures.

Scenario 1: Rate Adjustments and Reduced Capital Expenditures Assumes all identified funding requirements pursuant to Model Sensitivity 1 except reduces capital expenditures including minimal spending for the MRF rehabilitation and only funding 50% of projected new vehicle fleet requirements. Includes an allowance for rebuilding vehicles to extend the service life and minimize capital expenditures. Represents a moderate capital spending scenario, but doesn’t fully address capital reinvestment needs of the system. As can be seen in this scenario in contrast with Model Sensitivity 1, the forecast assumes less debt service associated with more moderate capital 936
spending assumptions.

The following chart presents the total capital funding requirements assumed in this scenario. The majority of spending is assumed in the Fiscal Year 2025/26 associated with funding for the replacement of the MRF facility roof and partial equipment replacement. It is expected that the City will require further capital reinvestment to the MRF facility beyond the forecast period.

To fully fund the revenue requirements of the scenario the following rate adjustments were recognized:

Assuming implementation of the identified rate adjustments the City is expected to maintain compliance with the minimum reserve target equivalent to 25% of operating expenditures. 937
Scenario 2: Phased Rate Adjustments and Reduced Capital Expenditures Builds off of Scenario 1, but assumes a $5 million interfund loan to assist ER in phasing the identified rate increases over three (3) years. Represents a moderate capital spending scenario with phased increases. As can be seen in this scenario in contrast with Scenario 3, the forecast assumes a more moderate phase-in of the proposed system revenues.

The following rate adjustments were recognized:

Assuming implementation of the identified rate adjustments the City is expected to reach compliance with the minimum reserve target equivalent to 25% of operating expenditures, however, cash reserves are expected to be substantially depleted by the Fiscal Year 2025/26 resulting in an increased financial risk to other City funds. 938
Scenario 3: Rate Adjustments and Full Capital Expenditures Assumes all identified funding requirements as assumed in Model Sensitivity 1, including the full capital funding requirements. Represents necessary rate adjustments to fund a fiscally sustainable operation and maintain regulatory compliance. The following chart presents a forecast of the funding requirements consistent with Model Sensitivity 1, however also assumes additional revenue adjustments. The debt assumptions observed to fully fund the CIP assume: i) $46.5 million in 20-year loans at 5% interest for the facility capital improvements; and ii) approximately $28 million in capital leases with a 7-year repayment at 3% interest. Total debt and capital lease payments are expected to increase from approximately $2 million a year to $10 million a year at its highest level by the Fiscal Year 2027/28.

The following presents the proposed rate adjustments to fully fund the requirements of this scenario.

Assuming implementation of the identified rate adjustments the City is expected to maintain compliance with the 939
minimum reserve target equivalent to 25% of operating expenditures, however, cash reserves are expected to be substantially depleted by the Fiscal Year 2025/26 resulting in an increased financial risk to other City funds.

Scenario 4: Phased Rate Adjustments and Full Capital Expenditures Assumes all identified funding requirements as stated in Model Sensitivity 1 and Scenario 3, including the full capital funding requirements. It only varies from Scenario 3 in that it phases the rate increase over a 3-year period through an assumed $5 million interfund loan. As can be seen in this scenario in contrast with Scenario 3, the forecast assumes a more moderate phase-in of the proposed system revenues.

The following rate adjustments were recognized:

Assuming implementation of the identified rate adjustments the City is expected to reach compliance with the minimum reserve target equivalent to 25% of operating expenditures, however, cash reserves are expected to be substantially 940
depleted by the Fiscal Year 2025/26 resulting in an increased financial risk to other City funds.

Scenario Comparisons and Key Observations:

Scenario Residential Bill Impact Comparison
As can be seen below, Scenario 1 and 3 represent the largest single rate revenue adjustments ranging from approximately $14 to $15 per month. Based on comparison Model Sensitivity 2 we can infer that 86% of the rate increase is to address the operating expenses / structural deficiency of the system. Of Scenarios 1 and 3, only Scenario 3 fully funds the total identified needs of the system.

Additionally, we performed a sensitivity with Scenarios 2 and 4, which phased in the rate increases over a three (3) year period. Scenario 2 represents the moderate capital funding at $7.55/month while Scenario 4 represents the full capital funding requirements at $8.70/month.

FY 2024/25FY 2025/26FY 2026/27FY 2027/28FY 2028/29
Model Sensitivity 1 $- $- $- $- $-
Model Sensitivity 2 $13.24 $1.54 $1.37 $1.41 $1.45
Scenario 1 $14.16 $3.15 $1.68 $1.49 $1.54
Scenario 2 $7.55 $7.55 $7.55 $1.60 $-
Scenario 3 $15.39 $3.69 $2.74 $2.63 $1.66
Scenario 4 $8.70 $8.70 $8.70 $1.71 $0.00
941
Financial Assistance Programs
The City of Oxnard’s Utility Rate Assistance Program “Project Assist” is available for solid waste, water, and wastewater utility customers who qualify. This program was initially approved by City Council in May 2017 and has since been renewed annually. Project Assist grants financial relief equal to a monthly $25.00 maximum credit per utility bill charged to customers who meet the eligibility requirements. For FY 2023/24, staff requested to direct $241,500 from late penalty revenues to the Project Assist Program. The $241,500 allocation estimates that approximately 805 eligible utility customers could participate in the program for a full fiscal year.

Outreach Information
Requirements for Prop 218 and Timeline:

Proposition 218 has very strict rules that govern the revenue of the solid waste utility. Specifically:

1. An agency cannot collect revenue beyond what is necessary to provide the service.

2. Revenues derived from the charge shall not be used for any other purpose other than that for which the charge was imposed.

3. The amount of the fee may not be used for any other purpose other than that for which the change was imposed.

4. The amount of the fee may not exceed the proportional cost of service for the parcel.

5. No charge may be imposed for a service unless that service is actually used or immediately available to the owner of the property.

6. A written notice of the proposed charge shall be mailed to the record owner of each parcel at least 45 days prior to the public hearing when the agency considers all written protests against the charge.

Estimated Timeline for Proposition
942
Early January
2024
Mail Proposition 218 Notices (English & Spanish) containing the Proposed Solid Waste Rate increase to Property Owners and Ratepayers
March 4,
2023
Public Hearing for Proposed Rate
In addition to the required notification listed above, the City has created a multi-faceted outreach campaign to raise awareness of the Refuse Cost of Service draft Study, which includes two Community Meetings scheduled for Wednesday, November 15, 2023, at 6:30 p.m. at the South Oxnard Center and Wednesday, December 13, 2023, at 6:30 p.m. at the Oxnard City Council Chambers - streamed virtually via the City’s YouTube Channel.

Additionally, staff anticipates distributing a bilingual press release before the Community Meetings; running English and Spanish social media ads on Facebook and Instagram to inform residents and stakeholders; and publishing a bilingual print ad in VIDA newspaper. Paid outreach will be supplemented by including Refuse Cost of Service Study Community Meeting flyers in the neighborhood weekly packets and regularly posting on Nextdoor, Twitter, Facebook, and Instagram.

The City’s consultant, Raftelis, created an informational Rates 101 video in English and Spanish, which will be shared by staff at Community Meetings, on the City website, and via the City’s social media channels. Additionally, staff has created an ER Division video in English and Spanish, which details the operations and services provided by the division, and the economic challenges the division faces. The videos will be shared in a series of small clips on a YouTube playlist and social media channels for the community to access.

STRATEGIC PRIORITIES
This agenda item supports the Infrastructure and Natural Resources strategy. The purpose of the Infrastructure and Natural Resources strategy is to preserve and improve our roads, utilities, parks, trees, water supply and natural resources through effective planning, prioritization, and an equitable and efficient use of available funding.

FINANCIAL IMPACT
The solicitation of City Council input and feedback has no fiscal impact. Absent a rate adjustment, the draft cost of service study projects negative cash balances by FY 2024/25.

COMMITTEE OUTCOME
The Public Works and Transportation Committee approved 2-0 on November 14, 2023, to approve the staff recommendation and forward the item to the Council for input. The context of the staff report from Committee has been edited based on comments received at the November 14, 2023 meeting. In addition, the recommendation section has been updated to include comments that were received.

Prepared by: Brian Yanez, Assistant Public Works Director

ATTACHMENTS

1. City Presentation

2. Raftelis Presentation
943

CITY OF OXNARD
Solid Waste Rate Study January 24, 2024
944

THIS PAGE INTENTIONALLY LEFT BLANK
945
445 S. Figueroa St. Suite 1925, Los Angeles, CA 90071
www.raftelis.com
January 12, 2024
Mr. Brian Yanez
Assistant Public Works Director
City of Oxnard
305 West Third Street
Oxnard, CA 93030
Subject: Environmental Resources Cost of Service and Rate Study Report Dear Mr. Yanez:

Raftelis is pleased to provide this Environmental Resources Rate Study report for the City of Oxnard (City) to address current financial challenges the City is facing and to establish the Environmental Resources Enterprise Fund (ER Fund) solid waste system (System) rates and fees that are equitable and align with Proposition 218. The major objectives of the study include the following:
● Develop a financial plan for the ER Fund to ensure financial sufficiency, meet operation and maintenance costs, provide funding for capital replacement and renewal (R&R) needs, and improve the financial health of the enterprise;
● Review the current rate structure for the ER Fund and propose recommended changes based on the cost of service; and
● Perform a cost allocation and prepare a recommended five-year schedule of rates and fees for the ER Fund.

The report summarizes the key findings and recommendations related to the development of the financial plans for the solid waste enterprise and the development of the updated solid waste (refuse) Enterprise Fund rates and fees.

It has been a pleasure working with you and we thank you and the City staff for the support provided during the course of this study.

Sincerely,
Thierry A. Boveri, CGFM
Vice President
Sarah Neely
Consultant
946
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 4 Table of Contents
1 Contents

1. Executive Summary 8

1.1. Background 8

1.2. Process 8

1.3. Proposed ER Fund Financial Plan 9

1.4. Proposed ER Fund Rates and Fees 12

1.5. Proposed ER Fund Rate Bill Impacts 25

2. Methodology 26

3. Key Inputs and Assumptions 28

3.1. Key Inputs: Current Rates and Operations 28

3.2. Key Assumptions: Regulations 33

3.3. Key Assumptions: Customer Statistics 33

3.3.1. Customer Accounts 33

3.3.2. Waste Generation 38

3.4. Key Assumptions: Revenues 38

3.4.1. Other Revenues 44

3.5. Expenditures 44

3.5.1. Assumptions: Operating Expenses 44

3.5.2. Assumptions: Escalation Factors 46

3.5.3. Assumptions: Capital Expenditures 47

3.5.4. Existing and Proposed Debt Service 49

3.5.5. Minimum Cash Reserve Targets 50

4. Solid Waste Financial Plan 51

4.1. Rate Adjustments and Full Capital Expenditures 51

5. Solid Waste Cost-of-Service Analysis 54

5.1. Allocations of Net Revenue Requirement 54

5.2. Calculated Equivalent Billing Units (EBUs) 61

5.3. Rate Design 65

5.4. Proposed 5-Year Solid Waste (refuse) Enterprise Fund Rate Schedule 67 947
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 5 List of Tables and Figures
Table 1: Proposed ER Fund Rate Revenue and Associated Fee Adjustments ........................................ 10 Figure 1: Proposed ER Fund Financial Plan ............................................................................................. 11 Figure 2: Proposed ER Fund Financial Plan: Cash Reserves .................................................................. 11 Figure 3: ER Fund Capital Financing Plan ................................................................................................ 12 Table 2: Proposed Five - Year Residential Monthly Solid Waste, Recycling, Organics / Green Waste 3- Cart Service (1x Week Collection) ............................................................................................................ 14 Table 3: Proposed Five - Year Residential Mobile Home Monthly Solid Waste, Recycling, Organics / Green Waste 3-Cart Service (1x Week Collection) ................................................................................... 14 Table 4: Proposed Five-Year Schedule of SOLID WASTE Service Rates for Multi-Family Residential (MFR) >4 units and Commercial Service by Frequency and Container Size (in CY) ............................... 14 Table 4 Continued SOLID WASTE Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards) ........................................... 15 Table 4 Continued SOLID WASTE Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards) ........................................... 16 Table 5: Proposed Five-Year Schedule of RECYCLE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) ................................ 17 Table 5 Continued RECYCLE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) .................................................. 18 Table 6: Proposed Five-Year Schedule of GREENWASTE Service Rates for Multi-Family Residential (MFR) >4 units and Commercial Service by Frequency and Container Size (in CY) ............................... 19 Table 6 Continued GREENWASTE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) .................................................. 20 Table 7: Proposed Five-Year Schedule of ORGANICS Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards) ........... 21 Table 8: Proposed Five-Year Schedule of SOLID WASTE Service Rates for 1x/ Week Commercial Cart Service by Quantity of Carts ..................................................................................................................... 21 Table 9: Proposed Five-Year Schedule of SERVICE PULL Rates for Industrial Collection ..................... 21 Table 10: Proposed Five-Year Schedule of Monthly and Daily Rental Rates for Industrial Bins .............. 22 Table 11: Proposed Five-Year Schedule of SOLID WASTE Walking Floor Transfer Trailer Rates for Industrial Service per Pull/Transfer ........................................................................................................... 22 Table 12: Proposed Five-Year Schedule of Del Norte and Industrial TIPPING FEES per Ton of Weighed Material and the Security and Contamination Prevention Fee .................................................................. 22 Table 13: Proposed Five-Year Schedule of Commercial Bin Rental Service for Construction and Demolition Projects for 10 Cubic Yards and Larger Bins .......................................................................... 23 Table 14: Proposed Five-Year Schedule of Commercial Bin Rental Service for Construction and Demolition Projects for 2 and 4 Cubic Yard Bins ...................................................................................... 24 Table 15: Proposed Five-Year Schedule of Miscellaneous Service Fees ................................................ 24 Table 16: Proposed Five-Year Schedule of Residential and Commercial Rate Impacts .......................... 25 Table 17: Current Residential Single Family ER Fund Rate Structure ..................................................... 28 Table 18: Current Multi-Family (<4 Units) Residential ER Fund Rate Structure ....................................... 29 Table 19: Current Non-Residential ER Fund Rate Structure .................................................................... 29 Table 20: Current Non-Residential ER Fund Rate Structure ................................................................... 30 948
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 6 Table 21: Schedule of Industrial Collection Rates .................................................................................... 31 Table 22: Current Tipping Fee ER Fund Structure ................................................................................... 31 Table 23: Current Miscellaneous Fee ER Fund Structure ........................................................................ 32 Table 24: Current Bin Rental Fees for ER Fund Structure ........................................................................ 32 Table 25: Projected Customer Statistics: Carts ........................................................................................ 34 Table 26: Projected Customer Statistics: Non-Residential Refuse Bins ................................................... 35 Table 27: Projected Customer Statistics: Non-Residential Recycling and Green Waste Bins .................. 36 Table 28: Projected Customer Statistics: Non-Residential Pick ups ......................................................... 37 Table 29: Projected Waste Generation (units in Tons) ............................................................................. 38 Table 30: Projected Cart Collection Revenues Under Current Rates ....................................................... 39 Table 31: Projected Non-Residential Refuse Collection Revenues Under Current Rates ........................ 40 Table 32: Projected Non-Residential Recycling and Green Waste Collection Revenues Under Current Rates ......................................................................................................................................................... 41 Table 33: Projected Non-Residential Collection Revenues by Pick-up Under Current Rates .................. 42 Table 34: Projected Gate Fees Under Current Rates ............................................................................... 43 Table 35: Projected Total Revenue Under Current Rates ........................................................................ 43 Table 36: Projected Miscellaneous Under Current Rates ......................................................................... 44 Figure 4: Operating Expense Forecast by Budgetary Cost Center ........................................................... 45 Table 37: Operating Expense Summary ................................................................................................... 45 Table 38: Projected Disposal Costs .......................................................................................................... 46 Table 39: Inflationary Assumptions ........................................................................................................... 46 Table 40: ZEV Milestone Options ............................................................................................................. 47 Table 41: Capital Improvement Plan: Full Capital ..................................................................................... 48 Table 42: Existing and Proposed Debt Service......................................................................................... 49 Table 43: Capital Lease Payment Adjustments ........................................................................................ 50 Table 44: Operating Reserve Target ........................................................................................................ 50 Figure 5: Proposed Solid Waste Financial Plan ........................................................................................ 52 Table 45: Proposed ER Fund Rate Revenue and Associated Fee Adjustments ...................................... 52 Figure 6: Solid Waste Capital Financing Plan ........................................................................................... 53 Figure 7: Proposed Ending Cash Reserves .............................................................................................. 53 Table 46: Operating Cost Center Descriptions ......................................................................................... 55 Table 47: COS Allocations for Residential, Commercial, & Industrial ....................................................... 56 Table 48: Fiscal Year 2029 Revenue Requirements Allocation Assumptions .......................................... 58 Table 49: Cost Allocations and Unit Cost Summary for Collection Services ............................................ 59 Table 50: Disposal Tip Fee Unit Cost Allocations for Commercial, Industrial, and Cash Customers ....... 60 Table 51: Combined Collection & Disposal Projected Unit Costs ............................................................. 60 Table 52: Calculated Equivalent Billing Units (EBU) ................................................................................. 61 Table 53: Calculated Unit Cost per Equivalent Billing Unit (EBU) ............................................................. 66 Table 54: C&D Tipping Fee Determination ............................................................................................... 66 Table 55: Proposed Five - Year Residential Monthly Solid Waste, Recycling, Organics / Green Waste 3- Cart Service (1x Week Collection) ............................................................................................................ 67 Table 56: Proposed Five - Year Residential Mobile Home Monthly Solid Waste, Recycling, Organics / Green Waste 3-Cart Service (1x Week Collection) ................................................................................... 67 Table 57: Proposed Five-Year Schedule of SOLID WASTE Service Rates for Multi-Family Residential (MFR) >4 units and Commercial Service by Frequency and Container Size (in CY) ............................... 67 949
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 7 Table 57 Continued SOLID WASTE Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards)................................... 68 Table 57 Continued SOLID WASTE Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards)................................... 69 Table 58: Proposed Five-Year Schedule of RECYCLE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) ............................ 70 Table 58 Continued RECYCLE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) .................................................. 71 Table 59: Proposed Five-Year Schedule of GREENWASTE Service Rates for Multi-Family Residential (MFR) >4 units and Commercial Service by Frequency and Container Size (in CY) ............................... 72 Table 59 Continued GREENWASTE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) .................................................. 73 Table 60: Proposed Five-Year Schedule of ORGANICS Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards) ........... 74 Table 61: Proposed Five-Year Schedule of SOLID WASTE Service Rates for 1x/ Week Commercial Cart Service by Quantity of Carts ..................................................................................................................... 74 Table 62: Proposed Five-Year Schedule of SERVICE PULL Rates for Industrial Collection ................... 74 Table 63: Proposed Five-Year Schedule of Monthly and Daily Rental Rates for Industrial Bins .............. 75 Table 64: Proposed Five-Year Schedule of SOLID WASTE Walking Floor Transfer Trailer Rates for Industrial Service per Pull/Transfer ........................................................................................................... 75 Table 65: Proposed Five-Year Schedule of Del Norte and Industrial TIPPING FEES per Ton of Weighed Material and the Security and Contamination Prevention Fee .................................................................. 75 Table 66: Proposed Five-Year Schedule of Commercial Bin Rental Service for Construction and Demolition Projects for 10 Cubic Yards and Larger Bins .......................................................................... 76 Table 67: Proposed Five-Year Schedule of Commercial Bin Rental Service for Construction and Demolition Projects for 2 and 4 Cubic Yard Bins ...................................................................................... 77 Table 68: Proposed Five-Year Schedule of Miscellaneous Service Fees ................................................ 77 Table 69: Proposed Fees for Replacement for Neglect, Damaged, or Missing Containers ......................... 77 List of Appendices
Appendix A: Solid Waste (refuse) Enterprise Fund Cash Flow Appendix B: Operating Expense Projections
Appendix C: Cost of Service
Appendix D: Rate Design Example
Appendix E: Allocation Factors
950
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 8

1. Executive Summary

1.1. Background
The City of Oxnard (City) contracted with Raftelis Financial Consultants (Raftelis) to conduct an Environmental Resources Rate Study (Study) comprising a ten-year financial forecast, a cost-of-service analysis, and a proposed five-year schedule of rates and fees1
for the Solid Waste System (System) of the Environmental Resources Department (Department). The Department is established as an Environmental Resources Enterprise Fund (ER Fund) meaning that the rates and fees for service must cover the cost of the service. This Study presents the financial plans, the cost-of-service analysis, and the proposed rates and fees for the Environmental Resources Enterprise Fund.

This Executive Summary provides a detailed overview of the rate study process, financial plan, proposed rates and bill impacts, and a monthly residential bill comparison. Through this Rate Study the City desires to establish fair and equitable rates that:
● Fund the projected fiscal requirements of the ER Fund in terms of operation and maintenance costs, capital replacement and refurbishment (R&R) in order to maintain operations, cash reserve (Reserves) levels, and improve the financial health of the enterprise; and ● Recommend a proposed five-year schedule of solid waste rates that meet the statutory requirements set forth in Proposition 218.

The City’s Department provides solid waste collection service to a population of over 201,000 customers in the City through approximately 34,480 residential customers and 5,082 commercial customers and apartment buildings. On an annual basis, the Department’s customers generate over 295,0002 tons of municipal solid
waste. In addition, the Department processes approximately 24,900 tons of comingled recyclables and 22,000 tons of organic materials (green waste and food waste) at the Del Norte Regional Recycling and Transfer Station (Del Norte Facility). The Del Norte Facility includes a scale house to weigh materials, a tipping floor to unload materials, a transfer facility for outbound materials, and a materials recovery facility (MRF) to process recyclables. The Del Norte Facility also accepts certain household hazardous waste, bulky materials, and other household wastes. The combined waste/recycle tonnages managed by ER’s collections amounts to approximately 317,100 tons annually as later presented in Table 29 within section 3 of this report. To dispose of outbound materials, the City has agreements with Waste Management for the disposal of solid waste at the Simi Valley Landfill, and with Agromin for the processing of organic materials.

1.2. Process
Raftelis developed a financial plan for the ER Fund which sets forth the total revenue adjustments needed to meet capital investments, operational expenses, debt service obligations, and increasing Reserve levels during the five-year rate-setting period. Raftelis worked with City staff to confirm key assumptions relied upon in the 1 Reference is made to the City’s rates and fees throughout this document to provide a distinction whereby “rates” refers to charges which are subject to Proposition 218 requirements while “fees” refers to optional services that are not subject to the Proposition 218 requirements.
2 Represents the annual amount of material collected and landfilled by the Department and includes residuals from processing of recyclables, bulky items, and other wastes. 951
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 9 determination of the Study recommendations, including the analysis of the adequacy of the operational requirements and corresponding costs to meet the level of service requirements of the System. This work effort resulted in the development of preliminary financial plan options for consideration by the City Council as presented at the December 5, 2023 council meeting. After presenting the financial plans, and receiving direction from City Council, Raftelis performed the cost-of-service analysis to determine the System rates and fees based on the selected financial plan.

Raftelis also assisted the City in presenting the rate and fee setting processes at community meetings in November and December 2023, as well as in January 2024. These events were conducted to inform customers about the levels of service the City provides, the need for Revenue Adjustment and associated fees (Revenue Adjustments) in order to continue providing these services, and the Proposition 218 legal requirements. During the preparation of the cost of service analysis the work effort identified bill impacts above those estimates presented to City Council and the public at the first community meeting. Based on direction from City staff and consistent with City Council comments at the December 5th , 2023 City Council meeting, the financial plan was adjusted to reduce the additional bill impacts to maintain consistency with what had been presented to City Council for the standard residential three (3) cart service. The key adjustments made to the financial plan to accomplish this goal included: i) extending out in future fiscal years some of the capital spending for facilities; ii) reducing discretionary future operating expense escalations; and iii) targeting compliance with the City’s current Reserve policy target over a longer period of time. Even though three key adjustments as stated above were made to the financial plan, the core objective of the plan to provide additional resources for fleet replacement and renew key facilities is still achieved.

1.3. Proposed ER Fund Financial Plan
Raftelis conducted a status quo scenario analysis to evaluate whether existing ER Fund rates and fees could adequately fund the City’s solid waste operations over the ten-year forecast period (Rate Study Period). This analysis projected annual revenues, operation and maintenance expenses, debt service payments, capital expenditures, and Reserve requirements through the Fiscal Year 2032. Based on the key assumptions of the analysis, Raftelis determined that the existing rates for solid waste services will not be adequate to generate sufficient revenues to maintain operation levels and fund the projected needs of ER Fund Services.

After the status quo analysis was complete, Raftelis prepared different Revenue Adjustment scenarios, which were presented to the City Council. The City Council selected scenario 3, which fully funds the projected revenue requirements with greater near-term rate adjustments, but lower overall increases over the five year rate adjustment period relative to Scenario 4, which represented the phase-in option with the same funding requirements.

Table 1 shows the proposed Revenue Adjustments based on the financial plan selected by the City Council, for the initial five years of the Rate Study Period. To ensure that the residential 3 cart bill impacts were generally consistent with what had been presented to City Council on December 5th, 2023, and consistent with Council’s comments and decisions, the overall Revenue Adjustment were lowered. Implementation for the proposed rate adjustments were assumed at the outset of each fiscal year, starting on July 1, 2024. It is recommended that the need for any future identified Revenue Adjustment be reviewed in the Fiscal Year 2028 or earlier in the event of a significant change in conditions during the recommendation period which would necessitate a change in rate revenues (i.e., changes in customer demands, regulations, cost of contracted disposal, etc.). 952
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 10 Table 1: Proposed ER Fund Rate Revenue and Associated Fee Adjustments Effective Date Preliminary Plan
(Scenario 3)
Adjusted &
Recommended Plan
July 1, 2024 50.00% 33.00%
July 1, 2025 8.00% 10.00%
July 1, 2026 5.50% 5.25%
July 1, 2027 5.00% 3.00%
July 1, 2028 3.00% 2.84%
Key factors influencing the need for proposed revenue adjustments include:
● City Council last approved a cost-of-service analysis in May 2012, resulting in rate adjustments effective January 2013. The authorized rate adjustments to the City’s ER Fund rates represent a cumulative

2.1% increase to residential rates and a 2.7% increase to commercial rates since 2012. In contrast, the Consumer Price Index (CPI) has increased 33.9% over the same period since 2013 through 2023. ● The City is subject to current and future unfunded local, state, and federal mandates regarding solid waste handling, including several recycling and composting laws that are already in effect and had major financial and operational impacts on the System and the ER Fund. For additional information reference section 3.2.
● As shown in Figure 1, the status quo scenario analysis indicates an initial funding deficiency within the initial Fiscal Year 2025 that accounts for approximately 2/3 of the overall need to increase rate revenues through the Fiscal Year 2029.
● Planned implementation of an Infrastructure Use Fee, which will amount to approximately $2 million annually and may begin in Fiscal Year 2025.

Addressing the funding deficiency and inflation will provide adequate funding for operations, capital funding, and support deposits to Reserves by the end of the initial five years of the Rate Study Period to help maintain compliance minimum Reserve targets.
(Remainder of Page Intentionally Left Blank)
953
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 11 Figure 1 provides a breakdown of the projected revenue requirements of the System. As can be seen from the gap analysis, the ER Fund’s current period expenditures (stacked bar) exceeds existing revenues (solid green line), which only grows over time due to elevated inflation in the cost of operations, additional expenses to address unfunded State mandates, need for significant capital investments, and replacement of aging capital.

Figure 1: Proposed ER Fund Financial Plan
Figure 2 shows projected operating and capital ending balances over the initial five year of the Rate Study Period relative to the City’s total Reserve targets under the proposed financial plan selected by Council.

Assuming implementation of the recommended rate adjustments, the City is projected to achieve 50% of the targeted minimum Reserve target and is projected to rebuild towards the Council policy such Reserves in the final year of the Rate Study Period.

Figure 2: Proposed ER Fund Financial Plan: Cash Reserves 954
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 12 Figure 3 shows the proposed capital financing plan over the initial five years of the Rate Study Period. The Study assumes that capital is funded primarily through short term capital leases and debt. The capital improvement plan is composed of facility investments, followed by fleet-related expenses and equipment purchases.

Figure 3: ER Fund Capital Financing Plan

1.4. Proposed ER Fund Rates and Fees
The proposed five-year ER Fund rate schedule was developed based on the cost-of-service allocation and rate structure as discussed in greater detail in Section 5. The proposed rate and fee structure revises the current rate structure and incorporates new service level offerings including:

1. Combining single family and multifamily 3-cart curbside service into a single class of service recognizing that the service is the same for both classes. The City offers two (2) refuse service levels at 64 gallon and 96 gallon to meet the needs of smaller and larger household sizes;

2. Creation of a mobile home class of service and rate for 3-cart service that mirrors the standard residential 3-cart rate structure which has been reduced by approximately 8% to reflect the exclusion of IUF payments; which is not applicable to mobile home parks;

3. Addition of new commercial bin / container size service offerings of 1 cubic yard through 4 cubic yard organic bin collection and disposal service;

4. Separation of the commercial rate structure for recycling and green waste. While the City has very few commercial green waste bin service customers, the collection costs for recycling and green waste are equivalent, however, due to differences in the disposal costs separation of the rate structure for these services is warranted;
955
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 13

5. Simplifying the commercial and industrial rate structure for roll-off service, by charging a single “pull rate” for all customers regardless of bin size. In conjunction with this rate structure change an additional bin rental fee is recommended and this fee will vary based on the size and cost of the bin.

Disposal costs will continue to be based on actual weight of material disposed of at the applicable tip fees proposed in the revised rate structure. This rate structure would also apply to and replace the City’s current commercial bin rental service fee structure for roll-off service where bins exceed 4 cubic yards; and

6. Addition of new tip fees at the Del Norte facility for single stream recyclables and organics. The recycling tip fee is only applicable to customers who do not currently pay a monthly collection rate for collection service within the City.
(Remainder of page intentionally left blank)
956
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 14 Table 2: Proposed Five - Year Residential Monthly Solid Waste, Recycling, Organics / Green Waste 3-Cart Service (1x Week Collection)
Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 Cart Service/64-gallon – per Unit1 $24.70 $39.33 $43.23 $45.48 $46.83 $47.12 3 Cart Service/96-gallon – per Unit1 $30.78 $47.41 $52.11 $54.83 $56.46 $56.89 Extra 96 Gallon Cart Service – Per Cart $11.34 $24.45 $26.88 $28.28 $29.13 $29.41 Multi-Family Residential 2 Units $58.51 Proposing to eliminate these service rates as the multi-family 4 units and less 3-cart curbside collection rate structure is combined with residential curbside 3-cart service listed above.

Multi-Family Residential 3 Units $84.73
Multi-Family Residential 4 Units $109.43
_____
1 Note that residential 3 cart service includes one (1) curbside bulky items collection (up to 5 items) per year at no additional charge.

Table 3: Proposed Five - Year Residential Mobile Home Monthly Solid Waste, Recycling, Organics / Green Waste 3-Cart Service (1x Week Collection)
Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 Cart Service/64-gallon – per Unit1 N/A $36.06 $39.63 $41.69 $42.93 $43.16 3 Cart Service/96-gallon – per Unit1 N/A $43.45 $47.76 $50.25 $51.74 $52.10 Extra 96 Gallons Cart Service N/A $22.41 $24.63 $25.92 $26.70 $26.96 ____
1 Note that residential mobile home 3 cart service includes one (1) curbside bulky items collection (up to 5 items) per year at no additional charge.

Table 4: Proposed Five-Year Schedule of SOLID WASTE Service Rates for Multi-Family Residential (MFR) >4 units and Commercial Service by Frequency and Container Size (in CY) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 cu yd bin 1x/week N/A $57.69 $63.44 $66.77 $68.77 $69.67 2x/week N/A $115.20 $126.71 $133.36 $137.35 $139.22
3x/week N/A $172.72 $189.98 $199.95 $205.94 $208.76
4x/week N/A $230.24 $253.25 $266.54 $274.53 $278.31
5x/week N/A $287.75 $316.52 $333.13 $343.12 $347.86
6x/week N/A $345.27 $379.78 $399.72 $411.70 $417.41

1 cu yd-shared 1x/week N/A $28.84 $31.72 $33.38 $34.38 $34.83 2x/week N/A $57.60 $63.36 $66.68 $68.68 $69.61
3x/week N/A $86.36 $94.99 $99.97 $102.97 $104.38
4x/week N/A $115.12 $126.62 $133.27 $137.26 $139.16
5x/week N/A $143.88 $158.26 $166.56 $171.56 $173.93
6x/week N/A $172.63 $189.89 $199.86 $205.85 $208.70
Table 4 Continued to following page.
957
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 15 Table 4 Continued SOLID WASTE Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 cu yd-compactor 1x/week N/A $83.23 $91.54 $96.34 $99.23 $100.56 2x/week N/A $166.29 $182.91 $192.51 $198.28 $200.99
3x/week N/A $249.35 $274.28 $288.67 $297.33 $301.43
4x/week N/A $332.41 $365.64 $384.83 $396.37 $401.86
5x/week N/A $415.48 $457.01 $481.00 $495.42 $502.30
6x/week N/A $498.54 $548.38 $577.16 $594.47 $602.73

2 cu yd 1x/week $132.76 $115.25 $126.77 $133.41 $137.41 $139.22 2x/week $232.25 $230.29 $253.30 $266.59 $274.59 $278.31 3x/week $298.56 $345.32 $379.84 $399.77 $411.76 $417.41 4x/week $364.87 $460.35 $506.37 $532.95 $548.94 $556.50 5x/week $431.21 $575.38 $632.91 $666.13 $686.11 $695.60 6x/week $497.53 $690.42 $759.45 $799.31 $823.29 $834.69

2 cu yd-shared 1x/week $66.44 $57.63 $63.38 $66.71 $68.71 $69.61 2x/week $116.18 $115.14 $126.65 $133.30 $137.29 $139.16 3x/week $149.37 $172.66 $189.92 $199.89 $205.88 $208.70 4x/week $182.51 $230.18 $253.19 $266.48 $274.47 $278.25 5x/week $215.67 $287.69 $316.46 $333.07 $343.06 $347.80 6x/week $248.83 $345.21 $379.72 $399.66 $411.64 $417.35

2 cu yd-compactor 1x/week $284.35 $166.34 $182.96 $192.56 $198.34 $200.99 2x/week $497.34 $332.46 $365.70 $384.89 $396.43 $401.86 3x/week $639.64 $498.59 $548.43 $577.22 $594.53 $602.73 4x/week $781.75 $664.71 $731.17 $769.55 $792.63 $803.61 5x/week $923.88 $830.83 $913.90 $961.88 $990.73 $1,004.48 6x/week $1,065.99 $996.95 $1,096.64 $1,154.20 $1,188.83 $1,205.35

3 cu yd 1x/week N/A $172.82 $190.09 $200.06 $206.06 $208.76 2x/week N/A $345.37 $379.89 $399.83 $411.82 $417.41
3x/week N/A $517.92 $569.70 $599.60 $617.58 $626.05
4x/week N/A $690.47 $759.50 $799.37 $823.35 $834.69
5x/week N/A $863.02 $949.31 $999.14 $1,029.11 $1,043.33 6x/week N/A $1,035.57 $1,139.11 $1,198.91 $1,234.87 $1,251.98

3 cu yd-shared 1x/week N/A $86.41 $95.04 $100.03 $103.03 $104.38 2x/week N/A $172.68 $189.95 $199.92 $205.91 $208.70
3x/week N/A $258.96 $284.85 $299.80 $308.79 $313.02
4x/week N/A $345.23 $379.75 $399.68 $411.67 $417.35
5x/week N/A $431.51 $474.65 $499.57 $514.55 $521.67
6x/week N/A $517.78 $569.56 $599.45 $617.44 $625.99
Table 4 Continued to following page.
958
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 16 Table 4 Continued SOLID WASTE Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 cu yd-compactor 1x/week N/A $249.45 $274.39 $288.78 $297.44 $301.43 2x/week N/A $498.64 $548.49 $577.28 $594.59 $602.73
3x/week N/A $747.82 $822.59 $865.77 $891.74 $904.04
4x/week N/A $997.00 $1,096.69 $1,154.26 $1,188.88 $1,205.35 5x/week N/A $1,246.19 $1,370.79 $1,442.75 $1,486.03 $1,506.65 6x/week N/A $1,495.37 $1,644.89 $1,731.24 $1,783.18 $1,807.96

4 cu yd 1x/week $230.86 $230.29 $253.30 $266.59 $274.59 $278.31 2x/week $403.90 $460.35 $506.37 $532.95 $548.94 $556.50 3x/week $519.26 $690.42 $759.45 $799.31 $823.29 $834.69 4x/week $634.63 $920.48 $1,012.52 $1,065.67 $1,097.64 $1,112.88 5x/week $749.98 $1,150.55 $1,265.59 $1,332.03 $1,371.99 $1,391.07 6x/week $865.36 $1,380.62 $1,518.66 $1,598.39 $1,646.34 $1,669.26

4 cu yd-shared 1x/week $115.47 $115.14 $126.65 $133.30 $137.29 $139.16 2x/week $202.02 $230.18 $253.19 $266.48 $274.47 $278.25 3x/week $259.70 $345.21 $379.72 $399.66 $411.64 $417.35 4x/week $317.36 $460.24 $506.26 $532.84 $548.82 $556.44 5x/week $375.06 $575.27 $632.80 $666.01 $685.99 $695.54 6x/week $432.71 $690.31 $759.33 $799.19 $823.17 $834.63

4 cu yd-compactor 1x/week $464.93 $332.46 $365.70 $384.89 $396.43 $401.86 2x/week $813.53 $664.71 $731.17 $769.55 $792.63 $803.61 3x/week $1,045.93 $996.95 $1,096.64 $1,154.20 $1,188.83 $1,205.35 4x/week $1,278.32 $1,329.20 $1,462.11 $1,538.86 $1,585.02 $1,607.09 5x/week $1,510.72 $1,661.44 $1,827.57 $1,923.52 $1,981.22 $2,008.83 6x/week $1,743.12 $1,993.69 $2,193.04 $2,308.17 $2,377.41 $2,410.58

959
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 17 Table 5: Proposed Five-Year Schedule of RECYCLE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 cu yd bin 1x/week N/A $27.28 $30.00 $31.57 $32.51 $32.90 2x/week N/A $54.39 $59.82 $62.95 $64.84 $65.69
3x/week N/A $81.51 $89.64 $94.34 $97.17 $98.47
4x/week N/A $108.62 $119.47 $125.73 $129.50 $131.25
5x/week N/A $135.73 $149.29 $157.12 $161.83 $164.04
6x/week N/A $162.84 $179.11 $188.51 $194.16 $196.82

1 cu yd-shared 1x/week N/A $13.64 $15.00 $15.78 $16.25 $16.45 2x/week N/A $27.20 $29.91 $31.48 $32.42 $32.84
3x/week N/A $40.75 $44.82 $47.17 $48.59 $49.23
4x/week N/A $54.31 $59.73 $62.87 $64.75 $65.63
5x/week N/A $67.86 $74.64 $78.56 $80.92 $82.02
6x/week N/A $81.42 $89.56 $94.26 $97.08 $98.41

1 cu yd-compactor 1x/week N/A $31.33 $34.45 $36.25 $37.33 $37.80 2x/week N/A $62.49 $68.72 $72.32 $74.49 $75.47
3x/week N/A $93.64 $103.00 $108.40 $111.65 $113.15
4x/week N/A $124.80 $137.27 $144.47 $148.80 $150.82
5x/week N/A $155.96 $171.54 $180.54 $185.96 $188.50
6x/week N/A $187.12 $205.82 $216.62 $223.11 $226.17

2 cu yd 1x/week $62.48 $54.44 $59.88 $63.01 $64.90 $65.69 2x/week $109.24 $108.67 $119.52 $125.79 $129.56 $131.25 3x/week $140.43 $162.89 $179.17 $188.57 $194.22 $196.82 4x/week $171.60 $217.11 $238.81 $251.34 $258.88 $262.38 5x/week $202.78 $271.34 $298.46 $314.12 $323.54 $327.95 6x/week $233.96 $325.56 $358.11 $376.90 $388.20 $393.52

2 cu yd-shared 1x/week $31.29 $27.22 $29.94 $31.51 $32.45 $32.84 2x/week $54.68 $54.33 $59.76 $62.89 $64.78 $65.63
3x/week $70.28 $81.45 $89.58 $94.28 $97.11 $98.41
4x/week $85.85 $108.56 $119.41 $125.67 $129.44 $131.19
5x/week $101.45 $135.67 $149.23 $157.06 $161.77 $163.98 6x/week $117.03 $162.78 $179.05 $188.45 $194.10 $196.76

2 cu yd-compactor 1x/week $133.74 $62.54 $68.78 $72.38 $74.55 $75.47 2x/week $233.96 $124.85 $137.32 $144.53 $148.86 $150.82 3x/week $300.77 $187.17 $205.87 $216.67 $223.17 $226.17 4x/week $367.58 $249.48 $274.42 $288.82 $297.48 $301.53 5x/week $434.38 $311.80 $342.97 $360.97 $371.79 $376.88 6x/week $501.19 $374.12 $411.52 $433.11 $446.10 $452.23 Table 5 Continued to following page.
960
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 18 Table 5 Continued RECYCLE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 cu yd 1x/week N/A $81.60 $89.75 $94.46 $97.29 $98.47
2x/week N/A $162.94 $179.22 $188.62 $194.28 $196.82
3x/week N/A $244.28 $268.69 $282.79 $291.27 $295.17
4x/week N/A $325.61 $358.16 $376.96 $388.26 $393.52
5x/week N/A $406.95 $447.63 $471.12 $485.25 $491.87
6x/week N/A $488.28 $537.10 $565.29 $582.25 $590.21

3 cu yd-shared 1x/week N/A $40.80 $44.88 $47.23 $48.64 $49.23 2x/week N/A $81.47 $89.61 $94.31 $97.14 $98.41
3x/week N/A $122.14 $134.35 $141.40 $145.64 $147.58
4x/week N/A $162.81 $179.08 $188.48 $194.13 $196.76
5x/week N/A $203.47 $223.81 $235.56 $242.63 $245.93
6x/week N/A $244.14 $268.55 $282.65 $291.12 $295.11

3 cu yd-compactor 1x/week N/A $93.74 $103.11 $108.51 $111.76 $113.15 2x/week N/A $187.22 $205.93 $216.73 $223.23 $226.17
3x/week N/A $280.69 $308.75 $324.95 $334.70 $339.20
4x/week N/A $374.17 $411.57 $433.17 $446.16 $452.23
5x/week N/A $467.64 $514.39 $541.39 $557.63 $565.26
6x/week N/A $561.11 $617.21 $649.61 $669.10 $678.28

4 cu yd 1x/week $108.58 $108.67 $119.52 $125.79 $129.56 $131.25 2x/week $189.95 $217.11 $238.81 $251.34 $258.88 $262.38 3x/week $244.80 $325.56 $358.11 $376.90 $388.20 $393.52 4x/week $298.40 $434.01 $477.40 $502.46 $517.53 $524.65 5x/week $352.63 $542.46 $596.69 $628.01 $646.85 $655.78 6x/week $406.87 $650.90 $715.98 $753.57 $776.17 $786.91

4 cu yd-shared 1x/week $54.35 $54.33 $59.76 $62.89 $64.78 $65.63 2x/week $95.03 $108.56 $119.41 $125.67 $129.44 $131.19
3x/week $122.15 $162.78 $179.05 $188.45 $194.10 $196.76 4x/week $149.26 $217.00 $238.70 $251.23 $258.76 $262.32 5x/week $176.39 $271.23 $298.35 $314.01 $323.42 $327.89 6x/week $203.48 $325.45 $357.99 $376.78 $388.08 $393.46

4 cu yd-compactor 1x/week $218.62 $124.85 $137.32 $144.53 $148.86 $150.82 2x/week $382.51 $249.48 $274.42 $288.82 $297.48 $301.53 3x/week $491.77 $374.12 $411.52 $433.11 $446.10 $452.23 4x/week $601.02 $498.75 $548.61 $577.41 $594.73 $602.93 5x/week $709.99 $623.38 $685.71 $721.70 $743.35 $753.63 6x/week $819.53 $748.01 $822.80 $865.99 $891.97 $904.34 961
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 19 Table 6: Proposed Five-Year Schedule of GREENWASTE Service Rates for Multi-Family Residential (MFR) >4 units and Commercial Service by Frequency and Container Size (in CY) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 cu yd bin 1x/week N/A $29.69 $32.64 $34.35 $35.38 $35.81 2x/week N/A $59.21 $65.11 $68.53 $70.58 $71.50
3x/week N/A $88.72 $97.58 $102.70 $105.78 $107.20
4x/week N/A $118.24 $130.05 $136.88 $140.98 $142.89
5x/week N/A $147.76 $162.52 $171.05 $176.18 $178.58
6x/week N/A $177.28 $194.99 $205.22 $211.38 $214.27

1 cu yd-shared 1x/week N/A $14.84 $16.32 $17.18 $17.69 $17.91 2x/week N/A $29.60 $32.56 $34.26 $35.29 $35.75
3x/week N/A $44.36 $48.79 $51.35 $52.89 $53.60
4x/week N/A $59.12 $65.03 $68.44 $70.49 $71.44
5x/week N/A $73.88 $81.26 $85.52 $88.09 $89.29
6x/week N/A $88.64 $97.50 $102.61 $105.69 $107.14

1 cu yd-compactor 1x/week N/A $36.14 $39.74 $41.82 $43.07 $43.61 2x/week N/A $72.11 $79.31 $83.47 $85.97 $87.11
3x/week N/A $108.08 $118.88 $125.11 $128.86 $130.60
4x/week N/A $144.05 $158.44 $166.76 $171.76 $174.10
5x/week N/A $180.02 $198.01 $208.40 $214.65 $217.59
6x/week N/A $215.99 $237.58 $250.05 $257.54 $261.09

2 cu yd 1x/week $62.48 $59.26 $65.17 $68.58 $70.64 $71.50 2x/week $109.24 $118.29 $130.11 $136.93 $141.04 $142.89 3x/week $140.43 $177.33 $195.05 $205.28 $211.44 $214.27 4x/week $171.60 $236.36 $259.99 $273.63 $281.84 $285.66 5x/week $202.78 $295.40 $324.93 $341.98 $352.24 $357.04 6x/week $233.96 $354.44 $389.87 $410.33 $422.63 $428.43

2 cu yd-shared 1x/week $31.29 $29.63 $32.58 $34.29 $35.32 $35.75 2x/week $54.68 $59.15 $65.05 $68.47 $70.52 $71.44
3x/week $70.28 $88.66 $97.52 $102.64 $105.72 $107.14
4x/week $85.85 $118.18 $129.99 $136.82 $140.92 $142.83
5x/week $101.45 $147.70 $162.46 $170.99 $176.12 $178.52 6x/week $117.03 $177.22 $194.93 $205.16 $211.32 $214.21

2 cu yd-compactor 1x/week $133.74 $72.16 $79.36 $83.52 $86.03 $87.11 2x/week $233.96 $144.10 $158.50 $166.81 $171.81 $174.10 3x/week $300.77 $216.04 $237.63 $250.10 $257.60 $261.09 4x/week $367.58 $287.98 $316.77 $333.39 $343.39 $348.08 5x/week $434.38 $359.92 $395.90 $416.68 $429.18 $435.07 6x/week $501.19 $431.86 $475.04 $499.97 $514.97 $522.05 Table 6 Continued to following page.
962
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 20 Table 6 Continued GREENWASTE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 cu yd 1x/week N/A $88.82 $97.69 $102.82 $105.90 $107.20 2x/week N/A $177.38 $195.10 $205.34 $211.50 $214.27
3x/week N/A $265.93 $292.51 $307.86 $317.09 $321.35
4x/week N/A $354.48 $389.92 $410.39 $422.69 $428.43
5x/week N/A $443.04 $487.33 $512.91 $528.29 $535.51
6x/week N/A $531.59 $584.74 $615.43 $633.89 $642.58

3 cu yd-shared 1x/week N/A $44.41 $48.85 $51.41 $52.95 $53.60 2x/week N/A $88.69 $97.55 $102.67 $105.75 $107.14
3x/week N/A $132.97 $146.26 $153.93 $158.55 $160.68
4x/week N/A $177.24 $194.96 $205.19 $211.35 $214.21
5x/week N/A $221.52 $243.67 $256.45 $264.15 $267.75
6x/week N/A $265.80 $292.37 $307.72 $316.95 $321.29

3 cu yd-compactor 1x/week N/A $108.18 $118.99 $125.23 $128.98 $130.60 2x/week N/A $216.09 $237.69 $250.16 $257.66 $261.09
3x/week N/A $324.00 $356.39 $375.09 $386.34 $391.57
4x/week N/A $431.91 $475.09 $500.03 $515.03 $522.05
5x/week N/A $539.82 $593.80 $624.96 $643.71 $652.54
6x/week N/A $647.74 $712.50 $749.90 $772.39 $783.02

4 cu yd 1x/week $108.58 $118.29 $130.11 $136.93 $141.04 $142.89 2x/week $189.95 $236.36 $259.99 $273.63 $281.84 $285.66 3x/week $244.80 $354.44 $389.87 $410.33 $422.63 $428.43 4x/week $298.40 $472.51 $519.75 $547.03 $563.43 $571.20 5x/week $352.63 $590.58 $649.63 $683.72 $704.23 $713.97 6x/week $406.87 $708.65 $779.50 $820.42 $845.03 $856.74

4 cu yd-shared 1x/week $54.35 $59.15 $65.05 $68.47 $70.52 $71.44 2x/week $95.03 $118.18 $129.99 $136.82 $140.92 $142.83
3x/week $122.15 $177.22 $194.93 $205.16 $211.32 $214.21 4x/week $149.26 $236.25 $259.87 $273.51 $281.72 $285.60 5x/week $176.39 $295.29 $324.81 $341.86 $352.12 $356.98 6x/week $203.48 $354.33 $389.75 $410.21 $422.52 $428.37

4 cu yd-compactor 1x/week $218.62 $144.10 $158.50 $166.81 $171.81 $174.10 2x/week $382.51 $287.98 $316.77 $333.39 $343.39 $348.08 3x/week $491.77 $431.86 $475.04 $499.97 $514.97 $522.05 4x/week $601.02 $575.75 $633.31 $666.55 $686.54 $696.03 5x/week $709.99 $719.63 $791.58 $833.13 $858.12 $870.01 6x/week $819.53 $863.51 $949.85 $999.71 $1,029.70 $1,043.99 963
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 21 Table 7: Proposed Five-Year Schedule of ORGANICS Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards)
FY2025 FY2026 FY2027 FY2028 FY2029
Cart & Bin Size Frequency Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 64-gallon 3x/week $63.80 $79.01 $86.90 $91.45 $94.19 $95.39 1 cu yd 1x/week N/A $83.11 $91.40 $96.20 $99.08 $100.34 2 cu yd 1x/week N/A $166.09 $182.69 $192.27 $198.04 $200.56 3 cu yd 1x/week N/A $249.08 $273.97 $288.35 $297.00 $300.77 4 cu yd 1x/week N/A $332.06 $365.26 $384.43 $395.96 $400.99 Table 8: Proposed Five-Year Schedule of SOLID WASTE Service Rates for 1x/ Week Commercial Cart Service by Quantity of Carts
FY2025 FY2026 FY2027 FY2028 FY2029
# of Carts / Size Frequency Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 96-gallon cart 1x/week $43.53 $36.51 $40.15 $42.26 $43.52 $44.01 2 96-gallon carts 1x/week $76.16 $73.03 $80.31 $84.51 $87.04 $88.01 3 96-gallon carts 1x/week $97.94 $109.54 $120.46 $126.77 $130.56 $132.02 4 96-gallon carts 1x/week $119.73 $146.06 $160.61 $169.02 $174.08 $176.03 5 96-gallon carts 1x/week $141.51 $182.57 $200.77 $211.28 $217.60 $220.04 6 96-gallon carts 1x/week $247.16 $219.09 $240.92 $253.53 $261.12 $264.04 Table 9: Proposed Five-Year Schedule of SERVICE PULL Rates for Industrial Collection FY2025 FY2026 FY2027 FY2028 FY2029
Bin Size / Service Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 Up to 10 CY / Refuse $147.73 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 10 CY / Recycle & Green Waste $73.87 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 13.4 CY / Refuse $147.73 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 13.4 CY / Recycle & Green Waste $73.87 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 20 CY Bin N/A $269.43 $296.38 $311.94 $321.30 $325.79 Up to 20 CY Compactor / Refuse $192.85 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 20 CY Compactor / Recycle & GW $96.32 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 30 CY Bin / Refuse $193.56 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 30 CY Bin / Recycle & GW $96.32 $269.43 $296.38 $311.94 $321.30 $325.79 30 CY Compactor / Refuse $219.04 $269.43 $296.38 $311.94 $321.30 $325.79 30 CY Compactor / Recycle & GW $109.52 $269.43 $296.38 $311.94 $321.30 $325.79 (Two / 2) 30 CY Bins / Refuse $371.86 N/A N/A N/A N/A N/A (Two / 2) 30 CY Bins / Recycle & GW $185.93 N/A N/A N/A N/A N/A 40 CY Bin / Refuse $238.84 $269.43 $296.38 $311.94 $321.30 $325.79 40 CY Compactor / Refuse $269.98 $269.43 $296.38 $311.94 $321.30 $325.79 40 CY Compactor / Recycle & GW $134.99 $269.43 $296.38 $311.94 $321.30 $325.79 964
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 22 Table 10: Proposed Five-Year Schedule of Monthly and Daily Rental Rates for Industrial Bins FY2025 FY2026 FY2027 FY2028 FY2029
Description Frequency Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 10 cu yd Roll Off Bin Monthly N/A $46.45 $47.84 $49.28 $50.76 $52.28 Daily N/A $1.53 $1.57 $1.62 $1.67 $1.72

13.4 cu yd Roll Off Bin Monthly N/A $49.99 $51.49 $53.03 $54.62 $56.26 Daily N/A $1.64 $1.69 $1.74 $1.80 $1.85
20 cu yd Roll Off Bin Monthly N/A $67.30 $69.32 $71.40 $73.54 $75.75 Daily N/A $2.21 $2.28 $2.35 $2.42 $2.49
30 cu yd Roll Off Bin Monthly N/A $58.05 $59.79 $61.58 $63.43 $65.33 Daily N/A $1.91 $1.97 $2.02 $2.09 $2.15
40 cu yd Roll Off Bin Monthly N/A $66.48 $68.47 $70.52 $72.64 $74.82 Daily N/A $2.19 $2.25 $2.32 $2.39 $2.46
40 cu yd Sealed Roll Off Bin Monthly N/A $87.09 $89.70 $92.39 $95.16 $98.01 Daily N/A $2.86 $2.95 $3.04 $3.13 $3.22
Table 11: Proposed Five-Year Schedule of SOLID WASTE Walking Floor Transfer Trailer Rates for Industrial Service per Pull/Transfer
FY2025 FY2026 FY2027 FY2028 FY2029
Description Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28
53-Foot Walking Floor Trailer $371.85 $384.86 $398.34 $412.28 $426.71 $441.64 Note this service rate is limited to industrial customer(s) receiving direct haul service to the Simi Landfill from the Customers Property located within the City.

Table 12: Proposed Five-Year Schedule of Del Norte and Industrial TIPPING FEES per Ton of Weighed Material and the Security and Contamination Prevention Fee Description Material Type Current July 1,
‘24
July 1,
‘25
July 1,
‘26
July 1,
‘27
July 1,
‘28
Del Norte Tip Fee Solid Waste $55.59 $93.88 $103.27 $108.69 $111.95 $113.52 Del Norte Tip Fee Recycling N/A $44.26 $48.68 $51.24 $52.77 $53.51 Del Norte Tip Fee Green Waste $62.81 $105.53 $116.08 $122.18 $125.84 $127.61 Del Norte Tip Fee Organics N/A $171.95 $189.14 $199.08 $205.05 $207.92 Del Norte Tip Fee C&D $66.92 $130.98 $131.78 $139.92 $143.48 $147.13 Del Norte Tip Fee Tires $180.00 $272.00 $280.16 $288.56 $297.22 $306.14 Walking Floor Transfer
Trailer Tip Fee1 Solid Waste N/A $34.63 $35.67 $36.74 $37.84 $38.98 Security and Contamination
Prevention Fee (Per Bin)2 All Containers $0.12 $0.12 $0.12 $0.12 $0.12 $0.12 ____________
1 Represents the tip fee for walking floor trailers direct hauled to the Simi Landfill. This rate is not applicable to refuse delivered to the Del Norte facility.
2 The City charges a security and contamination prevention fee to all customers per bin per month. 965
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 23 Table 13: Proposed Five-Year Schedule of Commercial Bin Rental Service for Construction and Demolition Projects for 10 Cubic Yards and Larger Bins

CURRENT FEES
Container Material Delivery Per
Empty
Initial
Cost
Disposal
Min. Prepay
10 Cubic
Yard Dirt and Concrete Only $15.00 $102.30 $117.30 $166.77 $284.07

13.4 Cubic
Yard
Roofing Materials / Green
Waste $15.00 $102.30 $117.30 $166.77 $284.07
30 Cubic
Yard
Roofing Materials / Green
Waste $15.00 $137.88 $152.88 $166.77 $319.65
40 Cubic yard Roofing Materials / Green
Waste $15.00 $172.35 $187.35 $166.77 $354.12
Other Related Fees:
$15.00 rental fee/day if minimum pickup of 2 times per month is not met – for construction rental only $55.59 per ton for household trash and green waste
$65.00 per ton for construction &/or demolition materials $27.80 minimum charge for up to 1/2 ton
PROPOSED FEES1
FY2025 FY2026 FY2027 FY2028 FY2029
Proposed Fees Material 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 Fee Per Pull
10 Cubic Yard Dirt and Concrete Only $269.43 $296.38 $311.94 $321.30 $325.79

13.4 Cubic
Yard Roofing Materials / Green Waste $269.43 $296.38 $311.94 $321.30 $325.79 30 Cubic Yard Roofing Materials / Green Waste $269.43 $296.38 $311.94 $321.30 $325.79 40 Cubic yard Roofing Materials / Green Waste $269.43 $296.38 $311.94 $321.30 $325.79 Bin Rental Fees2
10 cu yd Roll Off Bin $1.53 $1.57 $1.62 $1.67 $1.72

13.4 cu yd Roll Off Bin $1.64 $1.69 $1.74 $1.80 $1.85
20 cu yd Roll Off Bin $2.21 $2.28 $2.35 $2.42 $2.49
30 cu yd Roll Off Bin $1.91 $1.97 $2.02 $2.09 $2.15
40 cu yd Roll Off Bin $2.19 $2.25 $2.32 $2.39 $2.46
40 cu yd Roll Off Bin Sealed $2.86 $2.95 $3.04 $3.13 $3.22 Del Norte Tip Fees3
Refuse $93.88 $103.27 $108.69 $111.95 $113.52
Recycling $44.26 $48.68 $51.24 $52.77 $53.51
Green Waste $105.53 $116.08 $122.18 $125.84 $127.61
Organics $171.95 $189.14 $199.08 $205.05 $207.92
C&D $130.98 $131.78 $139.92 $143.48 $147.13
Minimum
Disposal Charge $28.41 $29.26 $30.14 $31.04 $31.97
____________
1 Contingent upon service availability by the City, additional service charges may apply such as collection of bulky items or tires.
2 Amounts shown derived from Table 10 and represent daily rental rates. 3 Amounts shown derived from Table 12.
966
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 24 Table 14: Proposed Five-Year Schedule of Commercial Bin Rental Service for Construction and Demolition Projects for 2 and 4 Cubic Yard Bins

CURRENT FEES
Container Material Delivery Per
Empty
Initial
Cost
Disposal
Min. Prepay
2 Cubic Yard Small items, green waste,
lumber $15.00 $50.00 $65.00 n/a n/a
4 Cubic Yard Small items, green waste,
lumber $15.00 $75.00 $90.00 n/a n/a
PROPOSED FEES1
FY2025 FY2026 FY2027 FY2028 FY2029
Proposed Fees Material 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 Fee Per Pull
2 Cubic Yard No furniture, no mattresses or
appliances. No dirt or concrete.

Small items, green waste, lumber
& miscellaneous okay.
$43.87 $46.25 $48.12 $49.73 $51.14
4 Cubic Yard $56.83 $60.50 $63.12 $65.18 $66.81
Bin Rental Fees2
2cu yd Bin $0.24 $0.25 $0.26 $0.27 $0.28
4 cu yd Bin $0.30 $0.31 $0.32 $0.33 $0.34
____________
1 Contingent upon service availability by the City, additional service charges may apply such as collection of bulky items or tires.
2 Amounts shown are daily rental rates.

Table 15: Proposed Five-Year Schedule of Miscellaneous Service Fees Current 2025 2026 2027 2028 2029
Return Pick-up / Extra Pick-up - Automatic Side Loader $11.74 $29.78 $30.67 $31.59 $32.54 $33.52 Return Pick-up / Extra Pick-up - Front Loader $40.00 $42.64 $43.92 $45.24 $46.60 $48.00 Minimum Gate Fee $27.80 $28.41 $29.26 $30.14 $31.04 $31.97 Bulky Pick-up (up to 5 items)1 $35.00 $45.00 $46.35 $47.74 $49.17 $50.65 __________
1 Please note that for Residential 3 cart service (including Mobile Homes) customers receive 1 bulky items pickup (up to 5 items) per year at no additional charge as noted in Tables 2 and 3. (Remainder of page intentionally left blank)
967
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 25

1.5. Proposed ER Fund Rate Bill Impacts
The proposed five-year ER Fund rate schedule was developed based on the cost-of-service allocation and rate structure as discussed in greater detail within Section 5. The following presents a bill impact comparison for the most common services offered by the City.

Table 16: Proposed Five-Year Schedule of Residential and Commercial Rate Impacts Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/2024 7/1/2025 7/1/2026 7/1/2027 7/1/2028 3 Cart Service/64-gallon – per Unit $24.70 $39.33 $43.23 $45.48 $46.83 $47.12 $ Change n/a $14.63 $3.90 $2.25 $1.35 $0.29
3 Cart Service/96-gallon – per Unit $30.78 $47.41 $52.11 $54.83 $56.46 $56.89 $ Change n/a $16.63 $4.70 $2.72 $1.63 $0.43
Extra 96 Gallon Cart Service – Per
Cart $11.34 $24.45 $26.88 $28.28 $29.13 $29.41
$ Change n/a $13.11 $2.43 $1.40 $0.85 $0.28
Multi-Family Residential 2 Units $58.51 Proposing to eliminate these service rates as the multi-family 4 units and less 3-cart curbside collection rate structure is combined with residential curbside 3-cart service listed above.

Multi-Family Residential 3 Units $84.73
Multi-Family Residential 4 Units $109.43
Commercial
2 cu yd bin - 1x/week - Refuse $132.76 $115.25 $126.77 $133.41 $137.41 $139.22 $ Change n/a ($17.51) $11.51 $6.65 $4.00 $1.80
2 cu yd bin - 2x/week - Refuse $232.25 $230.29 $253.30 $266.59 $274.59 $278.31 $ Change n/a ($1.96) $23.02 $13.29 $7.99 $3.72
2 cu yd bin - 3x/week - Refuse $298.56 $345.32 $379.84 $399.77 $411.76 $417.41 $ Change n/a $46.76 $34.52 $19.94 $11.99 $5.64
4 cu yd bin - 1x/week - Refuse $230.86 $230.29 $253.30 $266.59 $274.59 $278.31 $ Change n/a ($0.57) $23.02 $13.29 $7.99 $3.72
4 cu yd bin - 2x/week - Refuse $403.90 $460.35 $506.37 $532.95 $548.94 $556.50 $ Change n/a $56.45 $46.02 $26.58 $15.98 $7.56
4 cu yd bin - 3x/week - Refuse $519.26 $690.42 $759.45 $799.31 $823.29 $834.69 $ Change n/a $171.16 $69.03 $39.86 $23.98 $11.40
64-gallon - 3x/week - Organics $63.80 $79.01 $86.90 $91.45 $94.19 $95.39 $ Change n/a $15.21 $7.89 $4.56 $2.74 $1.20
Industrial - 30 CY - Refuse - Per
Tip (1) $308.63 $463.77 $510.14 $536.93 $553.03 $560.78 $ Change n/a $0.00 $79.26 $19.43 $11.22 $6.75
(1) Assumed a load of 138lbs per cubic yard based on EPA commercial refuse uncompacted waste density. Includes pull rate and tip fee.
968
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 26

2. Methodology
The foundation of this Study and the primary objective of the ER Fund rates and fees are to reasonably recover the cost of providing service including the cost of infrastructure, equipment investment, and compliance with recommended fiscal targets, which is referred to as a Revenue Sufficiency Evaluation.

Ensuring adequate cash reserves and appropriate cash flows generally results in a sustainable long-term financial plan that can mitigate the financial and operating risk(s) from unanticipated or sudden events to financial operations (e.g., changes in market conditions affecting operations and recovered materials revenues, reduced growth or tonnages, unanticipated or extraordinary expenses, unfunded mandates, etc.). The identified revenue requirements to be funded from rates are then allocated based on the type and level of service.

In order to assess the sustainability of the City’s rates for service, Raftelis developed a financial model capable of forecasting ER Fund operations over a ten-year Rate Study Period, which is necessary to assess the sustainability needs of the ER Fund for the proposed rate revenue and associated fee adjustment period for Fiscal Years 2025 through 2029. By forecasting operations over the ten-year Rate Study Period, the Study is able to capture non-annually recurring lifecycle costs such as vehicle and capital asset replacement, test sensitivity to potential changes in operations or costs, and examine projections of Reserves and net revenue margins to evaluate compliance with fiscal policies. Performing a thorough evaluation of the City’s funding requirements provides the ability to offer sound rate recommendations to help ensure the City has sufficient resources to fund operations and achieve their objectives.

Gross Revenues Gross Revenue
Requirements
969
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 27 The following provides a brief overview of the key activities performed for the Study:

1. An evaluation of the service area requirements for the City was performed. This included a review of recent historical customers served and corresponding waste generation such that: i) a representative forecast of the ER Fund’s needs from a financial standpoint could be prepared; and ii) a projection of rate revenues consistent with the projected service area needs could be developed.

2. Raftelis, with support of City staff, developed a projection of the System’s “net revenue requirements” which is comprised of the components summarized below. The first five components are expenditure requirements of the system and are funded from monthly user rates + Cost of Operation and Maintenance
+ Debt Service (Vehicle Leases & Facility Debt)
+ Indirect Cost Allocation and Administration Payments (Infrastructure Use Fees) + Capital Funding Requirements
+ Deposits to Reserves for Policy Compliance and Future Expenditures – Other Operating Revenue
– Interest Income / Transfers from Operating Reserves
= Net Revenue Requirements (Funded from Rates)

3. The net revenue requirements were then allocated by function and service to the various customer and service classes as later described in Section 5. The customer billing statistical data was then adjusted to represent a common unit of measure referred herein and throughout the report as the Equivalent Billing Unit (EBU). The collection system EBUs are denominated in the number of gallons of capacity per the customer’s cart or bin size times the annual number of pickups. The disposal system EBUs are denominated in the tonnage for the system. The allocated net revenue requirements were then divided by the EBUs to calculate the unit cost of collection and disposal services.

4. To determine the recommended rate, the calculated unit costs are factored based on the type and level of service. For example, to determine the residential monthly 3 cart service rates for 96 gallon service, the calculated unit costs for refuse / municipal solid waste collection, recycling, and organics were applied to the level of service parameters of once a week collection times the average number of weeks in a month times the number of gallons in the bin (i.e., unit cost x weekly collection frequency x average number of weeks in a month x the quantity of gallons of the cart). (Remainder of page intentionally left blank)
970
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 28

3. Key Inputs and Assumptions
Raftelis developed an ER Fund financial projection and rate calculation for a ten year period, which serves as the basis for the Rate Study Period as previously described. The City’s fiscal year spans from July 1 through June 30. Projections in future years were generally based on the budgeted Fiscal Year 2024 data using key assumptions outlined within Section 3 of this report. Assumptions generally include, but are not limited to, projections of growth and tonnage demands, expenditures as contained in the City’s budget, assumed changes in operations such as the addition of staffing, capital funding requirements, or other expectations of future cashflow projections. All assumptions were discussed with and reviewed by City staff. This section will detail all the key assumptions developed in support of the financial plan.

3.1. Key Inputs: Current Rates and Operations
The current ER Fund rates and fees for service were adopted pursuant to Ordinance No. 2861, which included a two-year schedule of rates with the current rates effective as of October 18, 2012, and January 1, 2013. City Council last approved a cost-of-service analysis in May 2012, resulting in rate adjustments effective January 2013. The authorized rate adjustments to the City’s ER Fund rates represent a cumulative 2.1% increase to residential rates and a 2.7% increase to commercial rates. In contrast, the Consumer Price Index (CPI) has increased 33.9% over the same period.

As it relates to residential solid waste collection service, the City provides residents with weekly collection service utilizing a three-bin (or three-stream) system for their combined garbage, recycling, and organic waste.

The monthly rate for residents includes one (1) cart for each of their household waste (garbage, recycling, and organic waste). Any additional carts are available for an additional fee. Table 17 shows the current adopted residential rates and fee schedule for single family residential service developed during the prior rate study.

Table 17: Current Residential Single Family ER Fund Rate Structure Residential Collection Rates and Fees Current
Initial 96-Gallon Cart Rate(1) $30.78
Initial 64-Gallon Cart Rate(1) $24.70
Extra Container Rate per Month $11.36
Extra Pickup Fee $11.74
Bulky Pickup Fee (up to 5 items)(2) $35.00
__________
(1) Charge for service includes garbage, recycling, organics collection every week.
(2) Up to 5 items are included in the fee, however the City will collect up to 10 items for an additional charge. City staff recommends bin rental service for more than 10 items.
971
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 29 The City also offers cart service to attached multi-family residential units 4 or less. This can include mobile homes, town homes, duplexes, triplexes, and quadraplexes. Table 18 shows the current adopted residential rate schedule developed during the prior rate study.

Table 18: Current Multi-Family (<4 Units) Residential ER Fund Rate Structure Residential Collection Rates Current
First Unit $30.78
Second Unit $27.73
Third Unit $26.22
Fourth Unit and Above $24.70
__________
(1) Charge for service includes garbage, recycling, organics collection every week.

Along with residential cart collection service, the City provides curbside cart collection service to its nonresidential and commercial customers which varies in the level of service based on demand. The City also offers bin collection service to the non-residential and multi-family greater than four units (>4) receiving commercial-like bin service. Table 19 and Table 20 show the current adopted monthly rates for such service.

Table 19: Current Non-Residential ER Fund Rate Structure Non-Residential & Commercial Cart
Collection Rates 2024
Non-Residential & Commercial Cart
Collection Rates – Refuse Only
One 96-Gallon Cart $43.53
Two 96-Gallon Carts $76.16
Three 96-Gallon Carts $97.94
Four 96-Gallon Carts $119.73
Five 96-Gallon Carts $141.51
Six 96-Gallon Carts $247.16
Non-Residential Carts & Commercial Cart
Collection Rate - Food Waste
One 64 -Gallon Cart $63.80

972
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 30 Table 20: Current Non-Residential ER Fund Rate Structure Non-Residential Bin Collection Rates Current
Description Solid
Waste GW&RCY
2 - Yard Bin:
2 - Yard Bin 1/week $132.76 $62.48
2 - Yard Bin 2/week $232.25 $109.24
2 - Yard Bin 3/week $298.56 $140.43
2 - Yard Bin 4/week $364.87 $171.60
2 - Yard Bin 5/week $431.21 $202.78
2 - Yard Bin 6/week $497.53 $233.96
2 - Yard Bin Shared:
2 - Yard Bin Shared 1/week $66.44 $31.29
2 - Yard Bin Shared 2/week $116.18 $54.68
2 - Yard Bin Shared 3/week $149.37 $70.28
2 - Yard Bin Shared 4/week $182.51 $85.85
2 - Yard Bin Shared 5/week $215.67 $101.45
2 - Yard Bin Shared 6/week $248.83 $117.03
2 - Yard Bin Compactor:
2 - Yard Bin Compactor 1/week $284.35 $133.74
2 - Yard Bin Compactor 2/week $497.34 $233.96
2 - Yard Bin Compactor 3/week $639.64 $300.77
2 - Yard Bin Compactor 4/week $781.75 $367.58
2 - Yard Bin Compactor 5/week $923.88 $434.38
2 - Yard Bin Compactor 6/week $1,065.99 $501.19
4 - Yard Bin:
4 - Yard Bin 1/week $230.86 $108.58
4 - Yard Bin 2/week $403.90 $189.95
4 - Yard Bin 3/week $519.26 $244.18
4 - Yard Bin 4/week $634.63 $298.40
4 - Yard Bin 5/week $749.98 $352.63
4 - Yard Bin 6/week $865.36 $406.87
4 - Yard Bin Shared:
4 - Yard Bin Shared 1/week $115.47 $54.35
4 - Yard Bin Shared 2/week $202.02 $95.03
4 - Yard Bin Shared 3/week $259.70 $122.15
4 - Yard Bin Shared 4/week $317.36 $149.26
4 - Yard Bin Shared 5/week $375.06 $176.39
4 - Yard Bin Shared 6/week $432.71 $203.48
4 - Yard Bin Compactor:
4 - Yard Bin Compactor 1/week $464.93 $218.62
4 - Yard Bin Compactor 2/week $813.53 $382.51
4 - Yard Bin Compactor 3/week $1,045.93 $491.77
4 - Yard Bin Compactor 4/week $1,278.32 $601.02
4 - Yard Bin Compactor 5/week $1,510.72 $709.99
4 - Yard Bin Compactor 6/week $1,743.12 $819.53
973
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 31 Table 21: Schedule of Industrial Collection Rates
Non-Residential Bin Collection Rates Pick-Up Charge Rate per Ton 10-Yard Refuse $147.73 $55.59
10-Yard Recyclables and Green Waste $73.87 $62.81

13.4-Yard Refuse $147.73 $55.59

13.4-Yard Recyclables and Green Waste $73.87 $62.81
20-Yard Compactor - Refuse $192.85 $55.59
20-Yard Compactor - Recyclables and Green Waste $96.32 $62.81 30-Yard Refuse $193.56 $55.59
30-Yard Recyclables and Green Waste $96.79 $62.81
30-Yard Compactor - Refuse $219.04 $55.59
30-Yard Compactor - Recyclables and Green Waste $109.52 $62.81 (2) 30-Yard Single Pick-up - Refuse $371.86 $55.59
(2) 30-Yard Single Pick-up - Recyclables and Green Waste $185.93 $62.81 40-Yard Refuse $238.84 $55.59
40-Yard Compactor - Refuse $269.98 $55.59
40-Yard Compactor - Recyclables and Green Waste $134.99 $62.81

In addition to the charges for collection, the City also charges tipping fees to its disposal customers and has a listing of miscellaneous fees. Table 22 through Table 24 show the current adopted tipping fees and miscellaneous fees. It should be noted that the fees shown are not an exhaustive list, but represent the key charges and fees that were examined as part of the study.

Table 22: Current Tipping Fee ER Fund Structure
Tipping Fees 2023
Material Rate per Ton
Refuse $55.59
Green Waste $62.81
Mixed Recyclables $0.00
Construction and Demolition (C&D) Debris $66.92
Hard to Handle or Bulky items $135.00
Special Handling $65.00
Special Pull Offs $75.00
Uncovered Loads Capable of Producing Litter (Per Ton) $5.00 Tires less than 36 inches $5.00
Tires 36 inches to 60 inches $30.00
Tires over 60 inches $200.00
Freon Extraction $20.00
Appliances $15.00
974
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 32 Table 23: Current Miscellaneous Fee ER Fund Structure
Miscellaneous Fees Current
Service Above Basic Levels $12.00
Security and Contamination Fee $0.12
Change Service $5.00
Walking Floor Transfer Trailer $385.34
Special Collection Services (Bulky Waste 5 Items) $35.00 Delivery Fee For Mechanical Loading Containers $15.00
Mechanical Loading Special Services Container 2 Yard $50.00 Mechanical Loading Special Services Container 4 Yard $75.00 Mechanical Loading Special Services Container 10 Yard $102.30 Mechanical Loading Special Services Container 13.4 Yard $102.30 Mechanical Loading Special Services Container 30 Yards $137.88 Mechanical Loading Special Services Container 40 Yard $172.35 Mechanical Loading Special Services Container Two 2 Yard $275.76 2/4 CY Damaged Castor Wheels - Commercial $20.00
Damaged Castor Wheels - Industrial $30.00
Container Cleaning - 2CY $40.00
Container Cleaning - 4CY $60.00
Container Cleaning - Compactor $110.00
Security Locking Device - 2CY / 4CY $60.00
Tire Collection
36 Inches and under $5.00
36 to 60 Inches $30.00
Over 60 Inches $200.00
Replacement for Neglect, Damaged, or Missing Containers Residential 96-gallon container $51.25
Residential 64-gallon containers $47.35
Commercial 2-cubic yard $445.12
Commercial 4-cubic yard $542.80
Industrial 1-cubic yard $585.00
Industrial 13.4-cubic yard $635.00
Industrial 30-cubic yard $700.00
Industrial 40-cubic yard $750.00

Table 24: Current Bin Rental Fees for ER Fund Structure Container Material Delivery Per
Empty
Initial
Cost
Disposal
Min. Prepay
2 Cubic Yard Small items, green waste, lumber $15.00 $50.00 $65.00 n/a n/a 4 Cubic Yard Small items, green waste, lumber $15.00 $75.00 $90.00 n/a n/a 10 Cubic Yard Dirt and Concrete Only $15.00 $102.30 $117.30 $166.77 $284.07

13.4 Cubic Yard Roofing Materials / Green Waste $15.00 $102.30 $117.30 $166.77 $284.07 30 Cubic Yard Roofing Materials / Green Waste $15.00 $137.88 $152.88 $166.77 $319.65 40 Cubic yard Roofing Materials / Green Waste $15.00 $172.35 $187.35 $166.77 $354.12 975
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 33

3.2. Key Assumptions: Regulations
The following section provides a summary overview of the legal and regulatory environment for solid waste management in the City. The summary is based on review of relevant State laws and regulations. This review should not be considered exhaustive and therefore should not be relied upon for any other purpose than the purposes of this Study to help provide relevant context concerning the level of service and operational requirements of the System. This section is not intended to represent or provide any legal opinions or interpretations on State law.
● AB 341 Mandatory Commercial Recycling (MCR) – Adopted into California Law in 2012 and requires businesses that generate four or more cubic yards of commercial waste per week and multi-family complexes with five or more units to self-haul or subscribe to recycling services. ● AB 1826 Mandatory Commercial Organics (MORe) – Effective January 1, 2016, and phases in the number of businesses and multi-family dwellings that are required to subscribe to commercial organic collection service.
● AB 827 – Effective July 1, 2020, and expands upon requirements of MCR and MORe to include mandatory recycling and organics carts for businesses at the “front of house” (i.e. portion of the business open to the public) to collect waste generated by customers from products they purchase and consume on the premises.
● SB 1383 Short-Lived Climate Pollutants (Organics Recycling) – Effective January 1, 2022, and requires jurisdictions to provide organic waste collection services to all residents and businesses so that they may divert all organic waste to a compost program.
● Applicable California Air Resources Board (CARB) Regulations3 : The Advanced Clean Fleets (ACF)
regulation is part of CARB’s overall approach to accelerate a large-scale transition to zero-emission medium- and heavy-duty vehicles. These requirements are pursuant to the Governor’s executive order N-79-20.
o Advanced Clean Fleets (ACF) regulation applies to local government fleets with common ownership of more than 50 vehicles, which is applicable to the City of Oxnard. The regulation requires State and local government fleets, including city, county, special district, and State agency fleets, to ensure specified percentages of vehicle purchases and/or fleet totals are zero-emission beginning as early as 2024, or otherwise face penalties.

3.3. Key Assumptions: Customer Statistics

3.3.1. Customer Accounts
The forecast of solid waste service revenues relied upon a review of recent historical trends in solid waste customer account growth and tonnage statistics. Based on the California Department of Finance (DOF) population projections, no growth to either residential or commercial service was assumed for the forecast.

The following tables provide a summary of the solid waste customer billing statistics:
3 https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-summary 976
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 34 Table 25: Projected Customer Statistics: Carts
Description Carts
Residential Single Family:
3 Cart Service - 64 Gallon Trash1 4,136
3 Cart Service - 96 Gallon Trash 29,083
Extra Container 3,189
Subtotal Residential Carts 36,408

Multi-Family Residential 4<:
3 Cart Service - 2 MF Units1 Reclassed
3 Cart Service - 3 MF Units1 Reclassed
3 Cart Service - 4 MF Units1 Reclassed
3 Cart Service - Mobile Homes1 2 2,000
Subtotal Multi-Family Carts 2,000

Commercial 96 Gallons (Trash):
96 Gallon – 1 Trash Container (1x wk) 246
96 Gallon – 2 Trash Containers (1x wk) 42
96 Gallon – 3 Trash Containers (1x wk) 13
96 Gallon – 4 Trash Containers (1x wk) 5
96 Gallon – 5 Trash Containers (1x wk) 4
96 Gallon – 6 Trash Containers (1x wk) 1
64 Gallons – Organics / Food (3x wk) 170
96 Gallon – Green Waste (2x wk) 5
96 Gallon – Recyclables (2x wk) 58
Subtotal Commercial Carts 545

Total Carts 38,953
_____
1 For purposes of this analysis and rate design the MultiFamily 4 Units or Less were reclassed to the Residential Single Family 3 Cart Service with 64 Gallon Refuse Service.

The billing system data reported approximately 585 accounts comprising 1,324 residential units.
2 Mobile home units are billed at the same rate as multifamily 4 or less units. Raftelis estimated the total number of mobile home units based on a review of the service addresses and the quantity of residential units per account.
977
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 35 Table 26: Projected Customer Statistics: Non-Residential Refuse Bins Description Refuse Bins
Multi-Family & Non-Residential (Refuse)
2 - Yard Bin:
2 - Yard Bin 1/week 656
2 - Yard Bin 2/week 402
2 - Yard Bin 3/week 163
2 - Yard Bin 4/week 57
2 - Yard Bin 5/week 23
2 - Yard Bin 6/week 21

2 - Yard Bin Shared:
2 - Yard Bin Shared 1/week 17
2 - Yard Bin Shared 2/week 17
2 - Yard Bin Shared 3/week 19
2 - Yard Bin Shared 4/week 60
2 - Yard Bin Shared 5/week 5
2 - Yard Bin Shared 6/week 0

2 - Yard Bin Compactor:
2 - Yard Bin Compactor 1/week 0
2 - Yard Bin Compactor 2/week 0
2 - Yard Bin Compactor 3/week 5
2 - Yard Bin Compactor 4/week 0
2 - Yard Bin Compactor 5/week 1
2 - Yard Bin Compactor 6/week 0

4 - Yard Bin:
4 - Yard Bin 1/week 507
4 - Yard Bin 2/week 572
4 - Yard Bin 3/week 432
4 - Yard Bin 4/week 167
4 - Yard Bin 5/week 85
4 - Yard Bin 6/week 107

4 - Yard Bin Shared:
4 - Yard Bin Shared 1/week 5
4 - Yard Bin Shared 2/week 17
4 - Yard Bin Shared 3/week 12
4 - Yard Bin Shared 4/week 7
4 - Yard Bin Shared 5/week 0
4 - Yard Bin Shared 6/week 4

4 - Yard Bin Compactor:
4 - Yard Bin Compactor 1/week 0
4 - Yard Bin Compactor 2/week 4
4 - Yard Bin Compactor 3/week 3
4 - Yard Bin Compactor 4/week 0
4 - Yard Bin Compactor 5/week 0
4 - Yard Bin Compactor 6/week 0

Subtotal Multi-Family & Non-Residential (Refuse) 3,368
978
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 36 Table 27: Projected Customer Statistics: Non-Residential Recycling and Green Waste Bins Description Recycling Green Waste
Multi-Family & Non-Residential (Recyclables & Green Waste) 2 - Yard Bin:
2 - Yard Bin 1/week 315 2
2 - Yard Bin 2/week 121 0
2 - Yard Bin 3/week 28 0
2 - Yard Bin 4/week 4 0
2 - Yard Bin 5/week 2 0
2 - Yard Bin 6/week 2 0

2 - Yard Bin Shared:
2 - Yard Bin Shared 1/week 6 0
2 - Yard Bin Shared 2/week 0 0
2 - Yard Bin Shared 3/week 0 0
2 - Yard Bin Shared 4/week 0 0
2 - Yard Bin Shared 5/week 0 0
2 - Yard Bin Shared 6/week 0 0

2 - Yard Bin Compactor:
2 - Yard Bin Compactor 1/week 1 0
2 - Yard Bin Compactor 2/week 0 0
2 - Yard Bin Compactor 3/week 3 0
2 - Yard Bin Compactor 4/week 0 0
2 - Yard Bin Compactor 5/week 0 0
2 - Yard Bin Compactor 6/week 0 0

4 - Yard Bin:
4 - Yard Bin 1/week 261 5
4 - Yard Bin 2/week 128 0
4 - Yard Bin 3/week 83 0
4 - Yard Bin 4/week 19 0
4 - Yard Bin 5/week 22 0
4 - Yard Bin 6/week 17 0

4 - Yard Bin Shared:
4 - Yard Bin Shared 1/week 3 0
4 - Yard Bin Shared 2/week 3 0
4 - Yard Bin Shared 3/week 1 0
4 - Yard Bin Shared 4/week 0 0
4 - Yard Bin Shared 5/week 0 0
4 - Yard Bin Shared 6/week 0 0

4 - Yard Bin Compactor:
4 - Yard Bin Compactor 1/week 1 0
4 - Yard Bin Compactor 2/week 0 0
4 - Yard Bin Compactor 3/week 0 0
4 - Yard Bin Compactor 4/week 0 0
4 - Yard Bin Compactor 5/week 0 0
4 - Yard Bin Compactor 6/week 0 0

Total Multi-Family & Non-Residential (Recyclables &
Green Waste) 1,020 7
979
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 37 Table 28: Projected Customer Statistics: Non-Residential Pick ups Description Pick-ups
Industrial Roll Off Container Pick-ups
10 yard Refuse 0
10 yard Recyclables And Green Waste 0

13.4 yard Refuse 1,476

13.4 yard Recyclables And Green Waste 468
20 yard Compacted Refuse 36
20 yard Compacted Recyclables And Green Waste 0
30 yard Refuse 4,195
30 yard Recyclables And Green Waste 350
30 yard Compacted Refuse 892
30 yard compacted Recyclables And Green Waste 22
(2)30 yard Single Pickup Refuse 0
(2)30 yard Single Pickup Recyclables And Green Waste 0
40 yard Refuse 2,317
40 yard Compacted Refuse 1,182
40 yard Compacted Recyclables And Green Waste 59

Total Pick-ups 10,997
(Remainder of page intentionally left blank)
980
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 38

3.3.2. Waste Generation
With respect to waste generation, the City currently collects approximately 317,100 tons of waste per year. The majority of tonnages can be attributed to the commercial and industrial customer classes. The City is responsible in working to achieve the required solid waste diversion goals set by the State of California, including compliance with organics diversion requirements from S.B. 1383 and A.B. 1826. The table shown below summarizes the City’s tonnage reports by type of waste.

Table 29: Projected Waste Generation (units in Tons)
Description 2024 2025 2026 2027 2028
Refuse 244,639 244,639 244,639 244,639 244,639
Green Waste 22,021 22,021 22,021 22,021 22,021
Mixed Recyclables 24,872 24,872 24,872 24,872 24,872
Construction and Demolition Debris 64 64 64 64 64
Hard to Handle or Bulky items 378 378 378 378 378
Special Handling 356 356 356 356 356
Special Pull Offs 1,578 1,578 1,578 1,578 1,578
Uncovered Loads Capable of Producing
Litter (Per Ton) 32 32 32 32 32
Tires less than 36 inches 0 0 0 0 0
tires 36 inches to 60 inches 18 18 18 18 18
tires over 60 inches 0 0 0 0 0
Freon Extraction 0 0 0 0 0
Appliances 28 28 28 28 28

Total Inbound at Del Norte 293,986 293,986 293,986 293,986 293,986 New Indy – Direct Haul* 23,133 23,133 23,133 23,133 23,133 Total 317,119 317,119 317,119 317,119 317,119
___________
* City direct hauls waste from New Indy to the Simi Landfill. Such tons are not directly processed through the City’s Del Norte facility.

3.4. Key Assumptions: Revenues
The projected revenues for the System are based on the assumed customer demands of the System as applied to the current rates and fees. Approximately 90% of ER Fund Service revenues are derived from Rate Revenue.

To validate the customer billing statistics relied upon in the calculation of the rates and fess of the System, Raftelis compared the product of the customer billing statistics and current rates to the audited and unaudited revenues of the System. Based on a comparison of the City’s calculated revenues (i.e., revenue calculated based on the product of customer billing statistics to rates and fees) to reported revenues revealed the amounts were within an approximate 1% variance and therefore no adjustments were reflected to the rate revenues in determination of the revenue sufficiency of the existing rates for service.

The rate revenue projections shown below assume that the current Fiscal Year 2024 rates as presented in section

3.1 are effective throughout the Rate Study Period and, therefore, represent estimated revenues in the absence of any rate increase. Table 30 through 35 presents the revenues under the current rates for ER Fund Services. 981
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 39 Table 30: Projected Cart Collection Revenues Under Current Rates Existing Revenues 2024 2025 2026 2027 2028 2029
Residential Customers
Initial 64-Gallon Cart $833,477 $833,477 $833,477 $833,477 $833,477 $833,477 Initial 96-Gallon Cart $11,334,920 $11,334,920 $11,334,920 $11,334,920 $11,334,920 $11,334,920 Each Extra Container (Trash, Recycling, or
Green Waste) $449,266 $449,266 $449,266 $449,266 $449,266 $449,266

Multi-Family Customers
Multi-Family Residential First Unit $0 $0 $0 $0 $0 $0
Multi-Family Residential Second unit $156,397 $156,397 $156,397 $156,397 $156,397 $156,397 Multi-Family Residential Third Unit $23,913 $23,913 $23,913 $23,913 $23,913 $23,913 Multi-Family Residential Each unit in
Excess of Three $11,856 $11,856 $11,856 $11,856 $11,856 $11,856

Non-Residential Customers
One 96-Gallon Cart $128,501 $128,501 $128,501 $128,501 $128,501 $128,501 Two 96-Gallon Carts $38,385 $38,385 $38,385 $38,385 $38,385 $38,385 Three 96-Gallon Carts $15,279 $15,279 $15,279 $15,279 $15,279 $15,279 Four 96-Gallon Carts $7,184 $7,184 $7,184 $7,184 $7,184 $7,184 Five 96-Gallon Carts $6,792 $6,792 $6,792 $6,792 $6,792 $6,792 Four 96-Gallon Carts (2 pickups / week) $2,966 $0 $0 $0 $0 $0 One 96-Gallon Cart GW and Recyclables $16,443 $16,443 $16,443 $16,443 $16,443 $16,443 One 64-Gallon Cart GW and Recyclables
(3 pick-ups / week) $130,141 $130,141 $130,141 $130,141 $130,141 $130,141

Total Cart Revenues $13,155,519 $13,152,553 $13,152,553 $13,152,553 $13,152,553 $13,152,553 (1) To validate the customer statistics, a revenue model based on the application of the customer statistics and the City’s current charges for service was developed.
(Remainder of page intentionally left blank)
982
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 40 Table 31: Projected Non-Residential Refuse Collection Revenues Under Current Rates Description 2024 2025 2026 2027 2028 2029
Commercial Customers- Refuse
2 - Yard Bin:
2 - Yard Bin 1/week $1,045,087 $1,045,087 $1,045,087 $1,045,087 $1,045,087 $1,045,087 2 - Yard Bin 2/week $1,120,374 $1,120,374 $1,120,374 $1,120,374 $1,120,374 $1,120,374 2 - Yard Bin 3/week $583,983 $583,983 $583,983 $583,983 $583,983 $583,983 2 - Yard Bin 4/week $249,571 $249,571 $249,571 $249,571 $249,571 $249,571 2 - Yard Bin 5/week $119,014 $119,014 $119,014 $119,014 $119,014 $119,014 2 - Yard Bin 6/week $125,378 $125,378 $125,378 $125,378 $125,378 $125,378

2 - Yard Bin Shared:
2 - Yard Bin Shared 1/week $13,554 $13,554 $13,554 $13,554 $13,554 $13,554 2 - Yard Bin Shared 2/week $23,701 $23,701 $23,701 $23,701 $23,701 $23,701 2 - Yard Bin Shared 3/week $34,056 $34,056 $34,056 $34,056 $34,056 $34,056 2 - Yard Bin Shared 4/week $131,407 $131,407 $131,407 $131,407 $131,407 $131,407 2 - Yard Bin Shared 5/week $12,940 $12,940 $12,940 $12,940 $12,940 $12,940

2 - Yard Bin Compactor:
2 - Yard Bin Compactor 3/week $38,378 $38,378 $38,378 $38,378 $38,378 $38,378 2 - Yard Bin Compactor 4/week $11,087 $11,087 $11,087 $11,087 $11,087 $11,087

4 - Yard Bin:
4 - Yard Bin 1/week $1,404,552 $1,404,552 $1,404,552 $1,404,552 $1,404,552 $1,404,552 4 - Yard Bin 2/week $2,772,370 $2,772,370 $2,772,370 $2,772,370 $2,772,370 $2,772,370 4 - Yard Bin 3/week $2,691,844 $2,691,844 $2,691,844 $2,691,844 $2,691,844 $2,691,844 4 - Yard Bin 4/week $1,271,799 $1,271,799 $1,271,799 $1,271,799 $1,271,799 $1,271,799 4 - Yard Bin 5/week $764,980 $764,980 $764,980 $764,980 $764,980 $764,980 4 - Yard Bin 6/week $1,111,122 $1,111,122 $1,111,122 $1,111,122 $1,111,122 $1,111,122

4 - Yard Bin Shared:
4 - Yard Bin Shared 1/week $6,928 $6,928 $6,928 $6,928 $6,928 $6,928 4 - Yard Bin Shared 2/week $41,212 $41,212 $41,212 $41,212 $41,212 $41,212 4 - Yard Bin Shared 3/week $37,397 $37,397 $37,397 $37,397 $37,397 $37,397 4 - Yard Bin Shared 4/week $26,658 $26,658 $26,658 $26,658 $26,658 $26,658 4 - Yard Bin Shared 5/week $0 $0 $0 $0 $0 $0
4 - Yard Bin Shared 6/week $20,770 $20,770 $20,770 $20,770 $20,770 $20,770

4 - Yard Bin Compactor:
4 - Yard Bin Compactor 2/week $39,049 $39,049 $39,049 $39,049 $39,049 $39,049 4 - Yard Bin Compactor 3/week $37,653 $37,653 $37,653 $37,653 $37,653 $37,653

Total $13,734,864 $13,734,864 $13,734,864 $13,734,864 $13,734,864 $13,734,864 983
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 41 Table 32: Projected Non-Residential Recycling and Green Waste Collection Revenues Under Current Rates
(Remainder of page intentionally left blank)
Description 2024 2025 2026 2027 2028 2029
Commercial Customers- Recycling and Green Waste
2 - Yard Bin:
2 - Yard Bin 1/week $237,674 $237,674 $237,674 $237,674 $237,674 $237,674 2 - Yard Bin 2/week $158,616 $158,616 $158,616 $158,616 $158,616 $158,616 2 - Yard Bin 3/week $47,184 $47,184 $47,184 $47,184 $47,184 $47,184 2 - Yard Bin 4/week $8,237 $8,237 $8,237 $8,237 $8,237 $8,237 2 - Yard Bin 5/week $4,867 $4,867 $4,867 $4,867 $4,867 $4,867 2 - Yard Bin 6/week $5,615 $5,615 $5,615 $5,615 $5,615 $5,615

2 - Yard Bin Shared:
2 - Yard Bin Shared 1/week $2,253 $2,253 $2,253 $2,253 $2,253 $2,253 2 - Yard Bin Shared 2/week $0 $0 $0 $0 $0 $0
2 - Yard Bin Shared 3/week $0 $0 $0 $0 $0 $0
2 - Yard Bin Shared 4/week $0 $0 $0 $0 $0 $0
2 - Yard Bin Shared 5/week $0 $0 $0 $0 $0 $0
2 - Yard Bin Shared 6/week $0 $0 $0 $0 $0 $0

2 - Yard Bin Compactor:
2 - Yard Bin Compactor 3/week $1,605 $1,605 $1,605 $1,605 $1,605 $1,605 2 - Yard Bin Compactor 4/week $10,828 $10,828 $10,828 $10,828 $10,828 $10,828

4 - Yard Bin:
4 - Yard Bin 1/week $345,284 $345,284 $345,284 $345,284 $345,284 $345,284 4 - Yard Bin 2/week $291,763 $291,763 $291,763 $291,763 $291,763 $291,763 4 - Yard Bin 3/week $243,203 $243,203 $243,203 $243,203 $243,203 $243,203 4 - Yard Bin 4/week $68,035 $68,035 $68,035 $68,035 $68,035 $68,035 4 - Yard Bin 5/week $93,094 $93,094 $93,094 $93,094 $93,094 $93,094 4 - Yard Bin 6/week $83,001 $83,001 $83,001 $83,001 $83,001 $83,001

4 - Yard Bin Shared:
4 - Yard Bin Shared 1/week $1,957 $1,957 $1,957 $1,957 $1,957 $1,957 4 - Yard Bin Shared 2/week $3,421 $3,421 $3,421 $3,421 $3,421 $3,421 4 - Yard Bin Shared 3/week $1,466 $1,466 $1,466 $1,466 $1,466 $1,466 4 - Yard Bin Shared 4/week $0 $0 $0 $0 $0 $0
4 - Yard Bin Shared 5/week $0 $0 $0 $0 $0 $0
4 - Yard Bin Shared 6/week $0 $0 $0 $0 $0 $0

4 - Yard Bin Compactor:
4 - Yard Bin Compactor 1/week $2,623 $2,623 $2,623 $2,623 $2,623 $2,623 4 - Yard Bin Compactor 2/week $0 $0 $0 $0 $0 $0

Total 1,610,728 1,610,728 1,610,728 1,610,728 1,610,728 1,610,728 984
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 42 Table 33: Projected Non-Residential Collection Revenues by Pick-up Under Current Rates Description 2024 2025 2026 2027 2028 2029
Non-Residential Customers by Pick-up
Industrial Roll Pass-through 30 CY $1,326,247 $1,326,247 $1,326,247 $1,326,247 $1,326,247 $1,326,247 Industrial Walking Floor Trailers Passthrough $674,043 $674,043 $674,043 $674,043 $674,043 $674,043 Industrial Roll Pass-through 13.4 CY $203,530 $203,530 $203,530 $203,530 $203,530 $203,530

Transfer Trailers $472,993 $472,993 $472,993 $472,993 $472,993 $472,993

10-yard Refuse $0 $0 $0 $0 $0 $0
10-yard Recyclables And Green Waste $0 $0 $0 $0 $0 $0

13.4-yard Refuse $218,049 $218,049 $218,049 $218,049 $218,049 $218,049

13.4-yard Recyclables And Green
Waste $34,571 $34,571 $34,571 $34,571 $34,571 $34,571

20-yard Compacted Refuse $6,943 $6,943 $6,943 $6,943 $6,943 $6,943 20-yard Compacted Recyclables And
Green Waste $0 $0 $0 $0 $0 $0

30-yard Refuse $811,984 $811,984 $811,984 $811,984 $811,984 $811,984 30-yard Recyclables And Green Waste $33,877 $33,877 $33,877 $33,877 $33,877 $33,877

30-yard Compacted Refuse $195,384 $195,384 $195,384 $195,384 $195,384 $195,384 30-yard compacted Recyclables And
Green Waste $2,409 $2,409 $2,409 $2,409 $2,409 $2,409

30-yard Single Pickup Refuse $0 $0 $0 $0 $0 $0
30-yard Single Pickup Recyclables
And Green Waste $0 $0 $0 $0 $0 $0

40-yard Refuse $553,392 $553,392 $553,392 $553,392 $553,392 $553,392 40-yard Compacted Refuse $319,116 $319,116 $319,116 $319,116 $319,116 $319,116 40-yard Compacted Recyclables And
Green Waste $7,964 $7,964 $7,964 $7,964 $7,964 $7,964

Total Pick-ups $4,860,503 $4,860,503 $4,860,503 $4,860,503 $4,860,503 $4,860,503

(Remainder of page intentionally left blank)
985
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 43 Table 34: Projected Gate Fees Under Current Rates
Description 2024 2025 2026 2027 2028 2029
Refuse $5,586,795 $5,586,795 $5,586,795 $5,586,795 $5,586,795 $5,586,795 Green Waste $518,308 $518,308 $518,308 $518,308 $518,308 $518,308 Mixed Recyclables $0 $0 $0 $0 $0 $0
Construction and Demolition
Debris $5,755 $5,755 $5,755 $5,755 $5,755 $5,755
Hard to Handle or Bulky items $301,320 $301,320 $301,320 $301,320 $301,320 $301,320 Special Handling $650 $650 $650 $650 $650 $650
Special Pull Offs $179,025 $179,025 $179,025 $179,025 $179,025 $179,025 Uncovered Loads Capable of
Producing Litter (Per Ton) $360 $360 $360 $360 $360 $360 Tires less than 36 inches $0 $0 $0 $0 $0 $0
Tires 36 inches to 60 inches $240 $240 $240 $240 $240 $240 Tires over 60 inches $0 $0 $0 $0 $0 $0
Freon Extraction $0 $0 $0 $0 $0 $0
Appliances $225 $225 $225 $225 $225 $225
Additional Revenues from Min.

Gate Fee $602,232 $602,232 $602,232 $602,232 $602,232 $602,232

Total $7,194,910 $7,194,910 $7,194,910 $7,194,910 $7,194,910 $7,194,910 Table 35: Projected Total Revenue Under Current Rates
Description 2024 2025 2026 2027 2028 2029
Collection
Residential $12,168,396 $12,168,396 $12,168,396 $12,168,396 $12,168,396 $12,168,396 Multi-Family $641,432 $641,432 $641,432 $641,432 $641,432 $641,432 Commercial / Non-Residential
Non-Residential Carts $345,690 $342,724 $342,724 $342,724 $342,724 $342,724 Non-Residential Refuse Bins $13,734,864 $13,734,864 $13,734,864 $13,734,864 $13,734,864 $13,734,864 Non-Residential Recycling and
Green Waste Bins $1,610,728 $1,610,728 $1,610,728 $1,610,728 $1,610,728 $1,610,728 Industrial $4,860,503 $4,860,503 $4,860,503 $4,860,503 $4,860,503 $4,860,503 Disposal
Gate Fees $7,194,930 $7,194,930 $7,194,930 $7,194,930 $7,194,930 $7,194,930 Other
Miscellaneous Revenues (1) $6,367,917 $3,685,141 $3,675,533 $3,682,891 $3,688,332 $3,706,119

Total $46,924,461 $44,238,719 $44,229,111 $44,236,469 $44,241,910 $44,259,697 (1) Amounts shown are presented in greater detail within Table 36. (Remainder of page intentionally left blank)
986
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 44

3.4.1. Other Revenues
Other ER Fund Service revenues include miscellaneous revenues, MRF recycle material sales, and investment income. The revenue from MRF recycle material sales is held constant throughout the forecast. Investment income was calculated by taking 1.25% of the average of the beginning and ending cash balances. As mentioned previously these other revenues equate to approximately 10% of gross revenues throughout the Rate Study Period.

Table 36: Projected Miscellaneous Under Current Rates
Description 2024 2025 2026 2027 2028 2029
ER Security and Contamination Prevention $177,441 $177,441 $177,441 $177,441 $177,441 $177,441 MRF Recycle Material Sale $2,778,510 $2,778,510 $2,778,510 $2,778,510 $2,778,510 $2,778,510 Rental Charges / Day Industrial $83,603 $86,529 $88,692 $90,909 $93,182 $95,512 Del Norte Host Fee $27,718 $28,688 $29,405 $30,140 $30,894 $31,666 Construction & Demolition Debris Fee $172,971 $179,025 $183,501 $188,089 $192,791 $197,611 Mattress Recycling $50,000 $51,750 $53,044 $54,370 $55,729 $57,122 Residential Split Container Fee $4,934 $5,107 $5,235 $5,366 $5,500 $5,638 Residential Green Waste Container Fee $6,324 $6,545 $6,709 $6,877 $7,049 $7,225 Residential Split Container Truck Fee $5,284 $5,469 $5,606 $5,746 $5,890 $6,037 Residential Green Waste Truck Fee $11,582 $11,987 $12,287 $12,594 $12,909 $13,232 Commercial Front End Loader Truck Fee $9,401 $9,730 $9,973 $10,222 $10,478 $10,740 Investment Income $176,021 $94,378 $75,148 $72,644 $67,976 $75,402 IUF Reimbursements $2,614,128 $0 $0 $0 $0 $0
Late Payment / Penalties Allowance $250,000 $249,982 $249,982 $249,982 $249,982 $249,982

Total 6,367,917 3,685,141 3,675,533 3,682,891 3,688,332 3,706,119

3.5. Expenditures
The expenditures during the Rate Study Period are primarily comprised of (1) operation and maintenance (operating) expenses; and (2) capital outlays.

3.5.1. Assumptions: Operating Expenses
The forecast of operating expenses was developed based upon: i) a review of the recent trends in historical expenses; ii) the Fiscal Year 2024 budget, iii) assumed growth rates and escalation factors to account for inflation in the costs of operation; and iv) discussions with the City staff. Figure 4 shown below presents an overview of the operating expense projections by cost center. (Remainder of page intentionally left blank)
987
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 45 Figure 4: Operating Expense Forecast by Budgetary Cost Center The ER Waste Transfer Haul cost center is the largest cost center for the System and is primarily comprised of disposal, supplementary waste hauling contracts, and personnel costs. Table 37 shown below presents a forecast of the operating expenses for the System by major category of expense. Overall, the single greatest expense is personnel, which has a growth rate of 2.9% per year. The assumed reduction in contractual operations during the Fiscal Year 2026 is related to the elimination of contracted waste hauling service due to the planned addition of two new collection routes. The forecast assumes incremental operating costs to account for the additional labor, fuel, maintenance, and vehicle purchases.

Table 37: Operating Expense Summary
Description 2024 2025 2026 2027 2028 2029 Growth
Personnel Expenses $23,847,782 $24,563,218 $25,937,342 $26,694,291 $26,694,291 $26,694,291 2.9% Fleet $1,344,235 $1,391,283 $1,426,065 $1,461,716 $1,498,258 $1,535,714 3.4% Disposal $11,975,304 $12,343,707 $12,705,492 $13,077,542 $13,459,886 $13,855,604 3.7% Other Contracted
Services $3,255,682 $3,369,631 $2,522,373 $2,585,431 $2,650,068 $2,716,320 (4.4%) Maintenance / Fuel $4,624,184 $4,855,394 $5,283,398 $6,054,380 $6,205,740 $6,360,885 8.3% Indirect Cost & IUF
Payments $2,107,536 $3,205,534 $4,284,301 $4,340,197 $4,397,491 $4,456,217 20.6% Utilities $220,869 $228,599 $234,314 $240,171 $246,175 $252,329 3.4% Supplies $1,702,295 $1,769,944 $1,839,367 $1,911,535 $1,986,552 $2,064,535 4.9% Professional Services $2,619,183 $2,710,855 $2,778,627 $2,848,092 $2,919,296 $2,992,279 3.4% Insurance $800,761 $828,789 $849,507 $870,745 $892,514 $914,826 3.4%

Total $52,497,831 $55,266,954 $57,860,786 $60,084,101 $60,950,272 $61,843,001 4.2% Disposal costs represent the next largest funding requirement accounting for 18% of the total operating expenditures of the System. The disposal fees are calculated for the System through the waste tonnage reports 988
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 46 and tipping fees charged by Simi Landfill. Tipping fees increased by 5.06% from Fiscal Year 2022 and Fiscal Year 2023, and it is assumed that these tipping fees will increase by a more modest 3% rate throughout the Rate Study Period. Table 38 details the calculation of the disposal costs for the Rate Study Period.

Table 38: Projected Disposal Costs
Description 2024 2025 2026 2027 2028 2029
Refuse Disposal Costs - Simi Landfill
Cost per Ton $33.62 $34.63 $35.67 $36.74 $37.84 $38.98
Refuse Tons 294,938 294,938 294,938 294,938 294,938 294,938 Calculated Costs $9,915,672 $10,213,703 $10,520,438 $10,836,022 $11,160,454 $11,496,683

Organics and Other Disposal Costs $347,049 $357,480 $368,215 $379,261 $390,616 $402,384

Total $10,262,720 $10,571,183 $10,888,654 $11,215,283 $11,551,070 $11,899,067 Together, the disposal costs and personnel expenses account for approximately $37.4 million or 64% of total operating expenses. The balance of operating expenses is for maintenance, repayment of indirect services, and other expenses.

As shown in Table 37, pursuant to the discussions with City staff, an annual transfer of approximately $2 million to the General Fund is assumed to reinstate the Infrastructure Use Fees (IUF) beginning midyear in the Fiscal Year 2025.

In aggregate, the total operating expenses for Solid Waste Services are estimated to increase by 4.2% annually.

For additional details concerning the projection of operating expenses please reference Appendix B at the end of this Study.

3.5.2. Assumptions: Escalation Factors
The operating expenses as presented in section 3.5.1 relied upon the application of inflation factors to the Fiscal Year 2024 operating expense budget and are presented in the following table. To ensure that future costs are reasonably projected, Raftelis worked with City staff to confirm the inflation escalation assumptions below.

Table 39: Inflationary Assumptions
Description 2025 2026 2027 2028 2029
Inflation - General 3.50% 2.50% 2.50% 2.50% 2.50%
Salary/Benefits 3.00% 3.00% 0.00% 0.00% 0.00%
Material and Supplies 4.00% 4.00% 4.00% 4.00% 4.00%
Utility 3.50% 3.50% 3.50% 3.50% 3.50%
Professional Services 3.50% 2.50% 2.50% 2.50% 2.50%
Maintenance / Fuel 5.00% 4.00% 2.50% 2.50% 2.50%
Supplemental Fleet Hauling 3.50% -57.50% 2.50% 2.50% 2.50% Capital 3.30% 3.30% 3.30% 3.30% 3.30%
Indirect Costs 3.50% 2.50% 2.50% 2.50% 2.50%
Customer Growth 0.00% 0.00% 0.00% 0.00% 0.00%
989
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 47

3.5.3. Assumptions: Capital Expenditures
The City has developed a comprehensive Capital Improvement Plan (CIP) over the course of the Rate Study Period. Over the next five (5) years (Fiscal Year 2024 – Fiscal Year 2029) the City has allocated $65.2 million into capital funding. The following table presents a summary of the planned annual capital spending over the Rate Study Period, which is expected to average approximately $10.9 million annually. The capital needs are primarily related to the need to replace the materials recovery facility (MRF) and MRF equipment that has reached the end of its useful life. Overall, the replacement facilities and facility improvements including equipment accounts for 72% of total capital expenditures between Fiscal Year 2024 – Fiscal Year 2029.

Fleet comprises the remaining 28% of the total CIP expenditure, and the City has planned to purchase additional vehicles to address planned level of service needs. Raftelis worked with City staff to develop a fleet replacement plan generally assuming 8- year service life for residential automatic side loaders, commercial front loaders, commercial roll-offs, commercial transfer trucks, and commercial rear end loaders. Based on discussions with City staff, to meet service demands placed upon the City (explained in Section 3.2), level of service goals, additional fleet vehicles and routes were assumed by the Fiscal Year 2026.

The Solid Waste Services vehicle fleet is subject to the new Advanced Clean Fleets regulations. The Advanced Clean Fleets (ACF) regulation is part of CARB’s overall approach to accelerate a large-scale transition to zeroemission medium- and heavy-duty vehicles. These requirements are pursuant to the Governor’s executive order N-79-20. This applies to local government fleets with common ownership of more than 50 vehicles and requires State and local government fleets, including city, county, special district, and State agency fleets, are required to ensure 50 percent of vehicle purchases are zero-emission beginning in 2025 and 100 percent of vehicle purchases are zero-emission by 2027. It should be noted that due to the planned timing of vehicle additions in the Rate Study Period, the City will not be required to purchase electric vehicles until Fiscal Year 2029. The City is also planning to use the ZEV Milestone Option for regulatory compliance which allows for the phased purchase of zero emission vehicles as presented below.

Table 40: ZEV Milestone Options
Source: https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-summary 990
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 48 Table 41: Capital Improvement Plan: Full Capital
Description Funding Source 2024 2025 2026 2027 2028 2029 CIP Projects
Compressed Natural Gas Facility Construction Proposed Debt $0 $0 $1,317,075 $0 $0 $0 Del Norte Facility Tip Fee Floor Construction Reserves $693,141 $0 $0 $0 $0 $0 Scale House Refurbishing Reserves $2,251,675 $0 $0 $0 $0 $0 Refuse Vehicles & Trucks Existing Debt $0 $0 $0 $0 $0 $0 Roof Replacement Del Norte Facility Proposed Debt $0 $0 $3,750,000 $3,750,000 $0 $0 Roof Repair Del Norte Proposed Debt $0 $200,000 $0 $0 $0 $0 Video Surveillance Del Norte Proposed Debt $0 $0 $300,000 $0 $0 $0 New/ R&R of Facilities
MRF Replacement Proposed Debt $0 $0 $3,000,000 $15,000,000 $15,000,000 $0 Transfer Station - Tractor Grapple Proposed Debt $0 $275,000 $0 $0 $0 $0 Facility Improvements (Locker rooms, showers, weld shop, paint booth) Proposed Debt $0 $0 $1,650,000 $0 $0 $0 Model Assumed Capital Plan Replacement
Equipment (Yellow Iron, Lease $99,477 $414,746 $174,337 $34,137 $0 $0 Replacement of Existing Containers / Roll-offs Reserves $0 $0 $0 $0 $0 $0 New Containers / Roll-offs Reserves $0 $0 $0 $0 $0 $0 Light Vehicles Lease $0 $243,122 $130,822 $0 $0 $115,660 Light Vehicles - Electrification Markup Lease $0 $0 $0 $0 $0 $127,226 Automatic Side Loader Lease $0 $2,472,000 $5,092,320 $0 $0 $0 Automatic Side Loader - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Automatic Side Loader New Lease $0 $1,828,250 $0 $0 $0 $0 Automatic Side Loader New - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Front-end Loaders Lease $0 $1,442,000 $742,630 $0 $0 $0 Front-end Loaders - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Front-end Loaders - New Lease $0 $0 $0 $0 $0 $0
Front-end Loaders - New - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Roll-Offs Lease $0 $1,545,000 $795,675 $0 $0 $0
Roll-Offs - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Roll-Offs - New Lease $0 $247,715 $0 $0 $0 $0
Roll-Offs - New - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Rear-end Loader Lease $0 $339,900 $0 $0 $0 $0
Rear-end Loader - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Rear-end Loader - New Lease $0 $0 $0 $0 $0 $0
Rear-end Loader - New - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Transfer Trucks Lease $92,879 $1,253,447 $149,275 $0 $12,850 $0 Transfer Trucks - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Transfer Trucks - New Lease $0 $0 $700,194 $0 $0 $0
Transfer Trucks - New - Electrification Markup Lease $0 $0 $0 $0 $0 $0 Total Capital Projects $3,137,172 $10,261,180 $17,802,329 $18,784,137 $15,012,850 $242,886 991
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 49

3.5.4. Existing and Proposed Debt Service
The solid waste fund currently pays capital leases from 2018 and 2021. This expense is currently about $2 million per year and is anticipated to decrease to about $1,990,394 in Fiscal Year 2028 and then $0 per year by the end of the Rate Study Period. The Study assumes additional debt funding to finance the capital improvement plan. Debt funding is assumed for the MRF replacement facility and the replacement equipment.

Capital leases are assumed for new vehicles in the forecast.

Table 42: Existing and Proposed Debt Service
Description 2024 2025 2026 2027 2028 2029
Existing Debt
Capital Lease – 2021 $1,537,189 $1,537,188 $1,537,188 $1,537,188 $1,537,189 0 Capital Lease – 2018 $584,075 $584,075 $584,075 $584,075 $584,075 0 Proposed Debt
Loan Project Deposit $0 $0 $9,717,075 $18,750,000 $15,000,000 $0 Issue Costs $0 $0 $97,171 $187,500 $150,000 $0
Total Loan Amount $0 $0 $9,814,246 $18,937,500 $15,150,000 $0 Finance Rate (%) 5.12% 5.12% 5.12% 5.12% 5.12% 5.12%
Term (years) 20 20 20 20 20 20
Issue Costs (%) 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Debt Service Payment $0 $0 $795,396 $2,330,186 $3,558,018 $3,558,018 Proposed Capital Lease
Loan Project Deposit $192,356 $10,061,180 $7,785,254 $34,137 $12,850 $242,886 Issue Costs $1,924 $100,612 $77,853 $341 $128 $2,429
Total Loan Amount $194,280 $10,161,792 $7,863,106 $34,478 $12,978 $245,315 Finance Rate (%) 3.26% 3.26% 3.26% 3.26% 3.26% 3.26%
Term (years) 7 7 7 7 7 7
Issue Costs 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Calculate Payments $31,495 $1,678,837 $2,953,537 $2,959,126 $2,961,230 $3,000,998 Existing and Proposed Debt
Payments $2,152,758 $3,800,101 $5,870,195 $7,410,576 $8,509,642 $6,559,016

Pursuant to discussions with City staff, the Department is not expected to issue debt prior to the Fiscal Year 2026. City staff anticipates renting vehicles until the Fiscal Year 2026. (Remainder of page intentionally left blank)
992
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 50 Table 43 details the adjusted capital lease payments assuming garbage vehicles are rented on a long term basis.

Table 43: Capital Lease Payment Adjustments
Description 2024 2025 2026 2027 2028 2029
Existing Debt
Capital Lease – 2021 $1,537,189 $1,537,188 $1,537,188 $1,537,188 $1,537,189 0 Capital Lease – 2018 $584,075 $584,075 $584,075 $584,075 $584,075 0 Proposed Debt
Debt Service Payment $0 $0 $795,396 $2,330,186 $3,558,018 $3,558,018 Proposed Capital Lease
Calculate Payments $31,495 $1,678,837 $2,953,537 $2,959,126 $2,961,230 $3,000,998 Rental Cost Adjustment $33,390 $2,258,579 $0 $0 $0 $0
Adjusted Payment $64,885 $3,937,416 $2,953,537 $2,959,126 $2,961,230 $3,000,998 Existing and Proposed Debt
Payments $2,186,148 $6,058,680 $5,870,195 $7,410,576 $8,509,642 $6,559,016

3.5.5. Minimum Cash Reserve Targets
Industry best practices recognize the need and benefit of maintaining minimum Reserves to provide necessary liquidity to fund day to day operations, provide resources to appropriate funds for expected capital outlays, and provide a reasonable allowance for unexpected needs. Pursuant to discussions with City staff the Study assumed the City’s currently adopted Reserve policy pursuant to Resolution No.#15718:
⎯ Operating Fund Reserve Target: the City Council will endeavor to maintain operating reserves equal to 25% of the operating budget reserve. This would be equivalent to 90 days of operating expenses, which was assumed to provide adequate liquidity for day-to-day operations and provide a reasonable allowance for unexpected costs.

Table 44 presents the forecast of minimum Reserve targets assumed for the Study.

Table 44: Operating Reserve Target
Description 2024 2025 2026 2027 2028 2029
Operating Reserves
Target $12,944,671 $13,627,468 $14,267,043 $14,815,258 $15,028,834 $15,248,959 As previously noted, based on direction from City staff, it was acceptable for Reserves to fall below the target noted in the City’s policy in order to help mitigate rate adjustments to customers so long as the Reserves were rebuilding within the final years of the forecast. City Council was informed of this and agreed when making its recommendation at the December 5, 2023 meeting.
(Remainder of page intentionally left blank)
993
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 51

4. Solid Waste Financial Plan
This section combines the assumptions previously discussed in the Study to determine the overall revenue adjustments and total amount of revenue required from rates. The revenue covers operating and maintenance (O&M), debt service, and capital expenses as well as Reserve funding. Revenue adjustments represent the average rate increase for the City as a whole; rate changes for individual customers will depend on the cost-ofservice analysis described in the following chapter.

Financial plan assumptions previously discussed in Section 3 were reviewed in detail by City staff. To develop the financial plan, Raftelis projected annual expenses and revenues, modeled Reserves, and planned capital expenditures. The City is anticipating financing the capital improvements through capital leases and debt. It is important to note that the most recently audited financial statements reported a $4 million net revenue loss for Fiscal Year 2022, and that the Fiscal Year 2024 adopted budget assumed net revenue losses. Due to the deficit in the ER Fund and need for significant rate increases, the Study contemplated four scenarios and two sensitivities ranging in capital expenditures and revenue adjustments. Per direction from City Council on December 5th, 2023, the Department was to further explore “Scenario 3 Rate Adjustments with Full Capital Expenditures” as detailed in the following section.

4.1. Rate Adjustments and Full Capital Expenditures
This scenario assumes all funding requirements including operating, capital, and proposed capital lease and debt payments. The key assumptions include:
● Fiscal Year 2023/2024 Served as the baseline for the Rate Study Period as adjusted for actual operating results and known cost increases;
o The operating expense growth is estimated at 4.2% per year; ● Assumes some additional collection routes to maintain regulatory compliance with AB1826, AB827, SB1383 and regular service demands;
● Assumes Infrastructure Use Fee (IUF) repayments from the City to ER ends in Fiscal Year 2024; ● Assumes resumption of IUF payments in Fiscal Year 2025 to the City; ● $40.7M reinvestment to MRF including new equipment and roof Fiscal Year 2026 - Fiscal Year 2028 ● Replacement of vehicles at end of life in Fiscal Year 2024/2025 ● Compliance with CARB Zero Emissions Vehicle Requirements ● Primarily relies on use of capital leases and debt to fully fund capital expenditures The following chart presents a forecast of the funding requirements assuming additional revenue adjustments.

The debt assumptions observed to fully fund the CIP assume: i) $43.9 million in 20-year loans at 5.1% interest for the facility capital improvements; and ii) approximately $18.5 million in capital leases through the Fiscal Year 2029 with a 7-year repayment at 3.3% interest. Total debt and capital lease payments are expected to increase from approximately $2 million a year to $8.5 million a year at its highest level by the Fiscal Year 2028.
994
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 52 Figure 5: Proposed Solid Waste Financial Plan
Table 45 shows proposed Revenue Adjustments for the Rate Study Period and highlights the five-year study recommendation period. Implementation for the proposed rate adjustments were assumed at the outset of each fiscal year beginning on July 1, 2024. As previously discussed, the Revenue Adjustments were reduced from the initial plan presented to City council on December 5th, 2023 to limit the bill impacts to customers associated with additional changes due to the cost of service allocation. Several Revenue Adjustment scenarios were presented to Council at the meeting and Council supported Scenario 3. Scenario 3 can be described as fully funding the projected revenue requirements with greater near-term rate adjustments, but lower overall increases over the five years relative to Scenario 4 which represented the phase-in option with the same funding requirements. It is recommended that the need for any future identified Revenue Adjustment be reviewed in the Fiscal Year 2028 or earlier in the event of a significant change in conditions during the recommendation period which would necessitate a change in rate revenues (i.e., changes in customer demands, regulations, cost of contracted disposal, etc.).

Table 45: Proposed ER Fund Rate Revenue and Associated Fee Adjustments Effective Date Preliminary Plan
(Scenario 3)
Adjusted &
Recommended Plan
July 1, 2024 50.00% 33.00%
July 1, 2025 8.00% 10.00%
July 1, 2026 5.50% 5.25%
July 1, 2027 5.00% 3.00%
July 1, 2028 3.00% 2.84%
The table below shows the proposed capital financing plan over the Rate Study Period. The Study assumes that capital is funded by Reserves, existing debt proceeds, proposed capital leases, and future proposed debt 995
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 53 issuances. It is important to note that this proposed scenario assumes allowances for capital needs for going concern of operations (including a new MRF) and addresses the level needs associated with additional routes.

Figure 6: Solid Waste Capital Financing Plan
The Figure below shows projected operating ending balances over the Rate Study Period relative to the City’s total Reserve targets under the proposed financial plan. Based on the increases in budgeted operating expenses, capital, and existing revenues the operating fund has been depleted with minimal rate adjustments over a decade. Assuming implementation of the recommended rate revenue and fee adjustments, the City is projected to achieve 50% of the targeted minimum Reserve target and is projected to rebuild such Reserves in the final year of the Rate Study Period.

Figure 7: Proposed Ending Cash Reserves

996
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 54

5. Solid Waste Cost-of-Service
Analysis
As previously described, the process of determining the cost-of-service begins with the allocation of revenue requirements and income and funds from other sources among the various services and customer classes. The main difference in costs among the customer classes relate to the frequency of collection, container size, waste generation, and services provided (i.e., residential customers receive collection services weekly for all three material streams). Additionally, the City relies on different fleet configurations to provide service for the various customer classes including the residential, commercial and industrial service classes. After costs are allocated by customer class, the equivalent units are then calculated based on the product of the container size and collection frequency, among other considerations, to calculate an equivalent unit cost. The equivalent unit costs are then used to calculate the rates for service based on the size and frequency of collection. In development of the proposed rates, the cost-of-service presents the final year of the cost allocation as Fiscal Year 2029. The rate schedules developed for the Fiscal Year 2025 through the Fiscal Year 2029 are based on the cost allocation and the Revenue Adjustment previously discussed throughout this Study. This section presents the details of the cost-of-service analysis conducted for the City’s solid waste services to customers.

5.1. Allocations of Net Revenue Requirement
Net revenue requirements are defined as the net costs to be recovered from the proposed rates or fees for service. They are calculated by taking the gross revenue requirements comprising the operating expenses, debt service, and other costs, less income and funds from other sources resulting in the net revenue requirements.

A cost-of-service analysis distributes a utility’s net revenue requirement (net costs) based on service to each customer class. Pursuant to the City’s budget, operating costs are functionalized by cost center and function.

Table 46 provides an overview of the operating budget cost center functions. These costs were then allocated to the customer classes based on several factors such as tonnages, Equivalent billing units (EBU) primarily determined by the service frequency times the number and size of containers, number of containers, capital costs of vehicles by service type and other factors as presented in Table 51. Appendix E provides details concerning the assumptions in development of the allocation factors and Appendix B provides details concerning the line item allocation of costs.
(Remainder of page intentionally left blank)
997
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 55 The cost allocation factors were developed after review of the City’s operating budgets and interviews with City staff. The factors were based on our understanding of the nature of the costs in order to assign reasonable appropriate cost allocation factors. Table 46 below provides a summary of the description and function of the City’s current operating budget cost centers which account for the majority of the allocated costs.

Table 46: Operating Cost Center Descriptions
Budgetary Cost Center Cost Center Description
ER Administration Overhead costs and Infrastructure Use Fees (IUF) Payments. Note IUF Payments are charged to residential single family residences only and do not apply to other residential units such as apartment complexes and mobile home parks.

ER Cleanup and Illegal
Dumping
This cost center includes bulky collection staff for residential service. Costs in the study only reflect bulky collection service costs.

ER Commercial Collection Collection and disposal services for commercial can and 2/4 cy bin trash, recycling, green waste, and organics
ER Industrial Collection Collection and disposal services for industrial >4 cy bin trash, recycling, green waste, and organic
ER Material Recovery
Facility
Reflects cost to operate the Del Norte MRF predominantly related to recycling, however also includes the green waste disposal cost
ER Outreach program Provides general public education related to the City’s solid waste programs ER Residential Collection Collection and disposal services for residential 3 cart service ER Tip Floor Processing
and Disposal
Reflects cost of the Del Norte facility scale and tipping floor operations. All materials inbound to the facility are weighed and pass-through the scales.

ER Waste Transfer Haul All materials for disposal are processed through this cost center, with exception to the green waste disposal costs which are separately accounted for within the ER MRF cost center. The primary cost accounted for in this cost center are the landfill disposal costs.

In addition to the operating expenses, the City’s rates also recover the cost of debt service repayments which can be categorized into either capital lease payments for purchase of vehicles and facility debt service payments issued to fund major facilities such as the Del Norte facility.

The City charges a variety of service fees, receives revenues from the sale of recoverable materials, and generates income from late payment fees and investment on Reserves. Together this income helps offset the cost recovered from rates, which is also referred to as the net revenue requirements as previously discussed. (Remainder of page intentionally left blank)
998
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 56 Table 47 presents a summary of the allocation percentages based on the various cost allocation metrics relied upon for the study. The allocation factors are calculated and presented in Appendix E. These factors were developed specifically for the format of the City’s operating budget and costs. Since the forecast assumes no growth the statistical data relied upon for the cost allocations remains constant during the Rate Study Period.

Table 47: COS Allocations for Residential, Commercial, & Industrial Collection & Disposal
COS Allocations
Residential (96-gallon Cans) Commercial Industrial Disposal Trash Recycling Green Waste Trash (96 gal) Trash (2/4 CY) Organic (64 gal) Recycle & GW Roll-off Refuse Recycling1 Green Waste Organics Residential EBU Allocator 34.1% 33.0% 33.0% 0.0% 0.0% 0.0% 0.0% 0.0% n/a n/a n/a n/a Commercial EBU Allocator 0.0% 0.0% 0.0% 0.6% 80.0% 0.5% 18.8% 0.0% n/a n/a n/a n/a Recycling EBUs 0.0% 73.4% 0.0% 0.0% 0.0% 0.0% 25.0% 1.7% n/a n/a n/a n/a EBU Allocator 19.7% 19.1% 19.1% 0.2% 27.8% 0.2% 6.5% 7.3% n/a n/a n/a n/a Customer Accounts/Bins 28.8% 28.8% 28.8% 0.8% 9.0% 0.5% 2.9% 0.4% n/a n/a n/a n/a Available Recycling + Available MSW Diversion Tons

37.6% 0.0% 0.0% 0.4% 52.8% 0.0% 0.0% 9.2% n/a n/a n/a n/a Direct Residential Trash 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% n/a n/a n/a n/a Direct Industrial / Roll-Off Collection 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% n/a n/a n/a n/a Containers 31.9% 31.9% 31.9% 0.4% 2.9% 0.1% 0.9% 0.1% n/a n/a n/a n/a Composite Expense 10.7% 6.1% 6.1% 0.1% 16.8% 0.1% 2.7% 5.1% 45.4% 2.1% 3.7% 0.0% Facility Debt Service Allocator 1.3% 63.0% 1.3% 0.0% 1.9% 0.0% 21.4% 1.9% 8.0% 0.4% 0.6% 0.0% Collection Route Vehicle Costs 17.9% 17.9% 13.9% 2.0% 17.9% 4.0% 4.0% 10.8% 10.4% 0.5% 0.7% 0.0% SIMI Disposal Cost Tons n/a n/a n/a n/a n/a n/a n/a n/a 96.1% 0.0% 0.0% 0.0% Tip Floor Tons n/a n/a n/a n/a n/a n/a n/a n/a 84.0% 8.5% 6.3% 0.0% Total Tons n/a n/a n/a n/a n/a n/a n/a n/a 85.2% 7.8% 5.9% 0.0% Transfer Trailer Tonnage Allocator n/a n/a n/a n/a n/a n/a n/a n/a 88.3% 4.5% 6.1% 0.0% Direct GW Disposal n/a n/a n/a n/a n/a n/a n/a n/a 0.0% 0.0% 100.0% 0.0% ____________________ 1) Allocation factor shown reflects the estimated recyclables within the MSW stream based on State Mandates and Cal Recycle’s waste composition estimates plus actual tons recycled by customer class. The allocation factor is used in the COS to allocate the MRF facility costs which was constructed to recover all recyclables from the MSW waste stream. 999
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 57 Shown in Table 47 are the facility debt service allocator and capital lease payment allocator. These two respective allocation factors were based on the existing and proposed debt proceed uses. With respect to the facility debt allocator, the majority of the debt is issued for the Del Norte MRF and was allocated to the recycling function. With respect to the capital lease payments, such costs were allocated based on the cost of the fleet assignable to the various services and functions by cost category and customer class. The allocation factors were then applied to the projected revenue requirements of the Division including a detailed allocation of the operating expenses by cost center and object code line item. Table 48 presents a summary of this allocation, which is presented in greater detail within Appendix C. (Remainder of page intentionally left blank)
1000
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 58 Table 48: Fiscal Year 2029 Revenue Requirements Allocation Assumptions Description Allocation
Factor FY 2029 Notes
Operating Expenses
Administration Tons $11,016,635 IUF Franchise Fee Payments are allocated by Residential EBUS
Cleanup and Illegal Dumping Res Bulky $279,519 Direct to Residential Trash Commercial Collection Com EBUs $8,610,823 Direct to Commercial EBU's Industrial Collection Direct Ind $2,530,088 Direct to Industrial EBU's Material Recovery Facility Avail Rcyc
Tons $7,497,376
Available Recycling Tons and Green
Waste Disposal was allocated by Green
Waste EBUS
Outreach program EBUs $466,255 Equivalent Billing Unit across Services Residential Collection Res EBUs $8,836,036 Direct to Residential EBU's Tip Floor Processing & Disposal Tip Floor Tons $3,693,600 Tip Floor Tonnages Waste Transfer Haul Transfer Tons $18,912,669 Transfers Tonnages and Disposal allocated by Simi Tonnages
$61,843,001
Debt Service
Proposed Debt Service Facility Debt $3,558,018 Facility Debt Allocator Proposed Capital Leases Fleet
Capital/Debt $3,000,998 Fleet Capital Debt Service Allocator

Other Revenues
Other Miscellaneous Revenues Tons $424,783 Total System Tonnages Breakout Security & Contamination Container $177,441 Containers MRF Recycle Material Sale Rcyc EBUs $2,778,510 Recycling EBU's Investment Income Tons $75,402 Total System Tonnages
Grants / Reimbursements Tons $0 Total System Tonnages
IUF Reimbursements Res EBUs $0 Direct to Residential EBU's Late Payment / Penalties Allowance Res Bulky $249,982 Direct to Residential Trash Net Funding Requirements $64,695,898

Deposits to / from Working Capital CompExp $1,589,513 Composite of Total Expenses Cost Recovery for Rate Design $66,285,411

(Remainder of page intentionally left blank)
1001
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 59 Table 49: Cost Allocations and Unit Cost Summary for Collection Services Collection Rate Unit Costs FY29
Residential Containers Commercial Containers Industrial Trash Recycling Green Waste Trash Service (96 gal) Trash Organic (64 gal) Recycling & GW Roll-off Collection Only Collection Operating Expenses $6,625,303 $3,745,040 $3,745,040 $81,936 $10,403,803 $48,195 $1,661,020 $3,152,831 Debt $584,182 $2,778,318 $463,503 $60,127 $603,635 $119,609 $881,993 $390,391 Less Income & Funds from Other Sources $306,565 $2,095,332 $56,583 $622 $5,059 $255 $695,133 $46,384 Net Funding Requirements $6,902,920 $4,428,026 $4,151,960 $141,441 $11,002,379 $167,548 $1,847,880 $3,496,838 Deposits to / from Working Capital $169,598 $108,792 $102,009 $3,475 $270,317 $4,116 $45,401 $85,914 Collection Cost Recovery $7,072,518 $4,536,818 $4,253,969 $144,916 $11,272,697 $171,665 $1,893,281 $3,582,752 Collection EBUs & Industrial Pulls 180,997,839 174,968,572 174,968,572 2,068,768 255,203,844 1,697,141 59,412,455 10,997Collection: Unit Cost Per Gallon/per pickup $0.0391 $0.0259 $0.0243 $0.0700 $0.0442 $0.1011 $0.0319 $325.7936 Disposal Cost Recovery for Collection RoutesMSW $5,673,068 $0 $0 $73,335 $9,046,595 $0 $0 $0 Recycling $0 $976,597 $0 $0 $0 $0 $332,242 $22,117 Green Waste $0 $0 $1,328,281 $0 $0 $0 $2,094 $0 C&D $0 $0 $0 $0 $0 $0 $0 $0 Organics $0 $0 $358,102 $0 $0 $22,669 $0 $0 Total $5,673,068 $976,597 $1,686,382 $73,335 $9,046,595 $22,669 $334,336 $0 Disposal EBUs $180,997,839 $174,968,572 $174,968,572 $2,068,768 $256,338,130 $1,697,141 $59,668,212 $0 Disposal: Unit Cost Per Gallon/per pickup $0.0313 $0.0056 $0.0096 $0.0354 $0.0353 $0.0134 $0.0056 $0.00 Recycling - Unit Cost Per Gallon/per pickup n/a n/a n/a n/a n/a n/a $0.0056 n/a Green Waste - Unit Cost Per Gallon/per pickup n/a n/a n/a n/a n/a n/a $0.0089 n/a Total Unit Cost Collection / Disposal $0.0704 $0.0315 $0.0340 $0.1055 $0.0795 $0.1145 $0.0375 n/a 1002
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 60 Table 50: Disposal Tip Fee Unit Cost Allocations for Commercial, Industrial, and Cash Customers Disposal
MSW Recycling Green Waste C&D1 Organics
Disposal Cost Recovery for Collection Routes Total $28,942,006 $1,330,956 $2,381,492 $4,153 $698,188 Disposal EBUs 254,954 24,872 18,663 64 3,358 Unit Cost Per Gallon/per pickup $113.52 $53.51 $127.61 n/a $207.92 Recycling - Unit Cost Per Gallon/per pickup n/a n/a n/a n/a n/a Green Waste - Unit Cost Per Gallon/per pickup n/a n/a n/a n/a n/a Total Unit Cost Collection / Disposal n/a n/a n/a n/a n/a _____ 1 The City does not receive a significant amount of construction and demolition (C&D) material. While the cost allocation was performed, such allocation were immaterial and the C&D disposal cost of service was developed using a direct cost calculation method as shown in Table 53.

Table 51 presents the projected unit costs developed from the projected Revenue Adjustments in Table XX and the unit costs from Table XX.

Table 51: Combined Collection & Disposal Projected Unit Costs Description FY2025 FY2026 FY2027 FY2028 FY2029
Revenue Adjustments 33.00% 10.00% 5.25% 3.00% 1.40% Residential Containers - Trash $0.0582 $0.0641 $0.0674 $0.0694 $0.0704 Residential Containers - Recycling $0.0261 $0.0287 $0.0302 $0.0311 $0.0315 Residential Containers - Green Waste $0.0281 $0.0309 $0.0325 $0.0335 $0.0340 Commercial Container Trash Service (96 gal) $0.0872 $0.0960 $0.1010 $0.1040 $0.1055 Commercial Refuse Bin Service $0.0657 $0.0723 $0.0761 $0.0784 $0.0795 Commercial Container Organic (64 gal) $0.0947 $0.1042 $0.1096 $0.1129 $0.1145 Commercial Recycling & GW Bin Service $0.0310 $0.0341 $0.0359 $0.0369 $0.0375 (Remainder of page intentionally left blank)
1003
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 61

5.2. Calculated Equivalent Billing Units (EBUs)
Equivalent billing units (EBU) are necessary to calculate the unit cost for the purpose of calculating the proposed rates. EBUs are developed by customer class and are generally calculated by taking the customer's container volume times the frequency of collection. Special adjustments are made for specific rates where service levels are not equivalent such as for additional carts, weekend service, and compactor service.

Table 52 provides a detailed accounting of the EBUs.

Table 52: Calculated Equivalent Billing Units (EBU)
Description 2029
Annual Tips Capacity
(gal)
Calculated
EBU % EBU
Allocation /Pulls (gal/yr
collected)
Residential 3-Cart Service:
3 Cart Service - 64 Gallon Trash 4,136 52 256 55,061,760 6.00% 3 Cart Service - 96 Gallon Trash 29,083 52 288 435,544,665 47.49% Extra Container 3,189 52 96 15,920,736 1.74%
Extra Pickup 391 1 96 37,536 0.00%

Multi-Family Residential 4<:
3 Cart Service - 2 MF Units Amounts shown were reclassified to the residential 3-cart service class. 3 Cart Service - 3 MF Units Amounts shown were reclassified to the residential 3-cart service class. 3 Cart Service - 4 MF Units Amounts shown were reclassified to the residential 3-cart service class. 3 Cart Service - Mobile Homes1 2,000 52 256 24,370,2861

2.66%

Commercial 96 Gallons (Trash):
96 Gallon – 1 Trash Container (1x wk) 246 52 96 1,230,528 0.13% 96 Gallon – 2 Trash Containers (1x wk) 42 52 192 420,160 0.05% 96 Gallon – 3 Trash Containers (1x wk) 13 52 288 188,448 0.02% 96 Gallon – 4 Trash Containers (1x wk) 5 52 384 99,840 0.01% 96 Gallon – 5 Trash Containers (1x wk) 4 52 480 99,840 0.01% 96 Gallon – 6 Trash Containers (1x wk) 1 52 576 29,952 0.00% 64 Gallons – Organics / Food (3x wk) 170 156 64 1,697,141 0.19% 96 Gallon – Green Waste (2x wk) 5 104 96 52,527 0.01%
96 Gallon – Recyclables (2x wk) 58 104 96 582,456 0.06% _________
1 Amounts shown were reduced by approximately 8% to reflect the reduction in equivalency of service since Mobile Homes are not applied the IUF expenditures in design of the rates.
(Remainder of page intentionally left blank)
1004
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 62 Description 2029
Annual Tips Capacity
(gal)
Calculated
EBU % EBU
Allocation /Pulls (gal/yr
collected)
Multi-Family & Non-Residential
(Refuse)
2 - Yard Bin:
2 - Yard Bin 1/week 656 52 404 13,779,474 1.50%
2 - Yard Bin 2/week 402 104 404 16,888,258 1.84%
2 - Yard Bin 3/week 163 156 404 10,271,590 1.12%
2 - Yard Bin 4/week 57 208 404 4,789,207 0.52%
2 - Yard Bin 5/week 23 260 404 2,415,609 0.26%
2 - Yard Bin 6/week 21 312 404 2,646,667 0.29%

2 - Yard Bin Shared:
2 - Yard Bin Shared 1/week 17 52 202 178,545 0.02%
2 - Yard Bin Shared 2/week 17 104 202 357,090 0.04%
2 - Yard Bin Shared 3/week 19 156 202 598,651 0.07%
2 - Yard Bin Shared 4/week 60 208 202 2,520,636 0.27%
2 - Yard Bin Shared 5/week 5 260 202 262,566 0.03%
2 - Yard Bin Shared 6/week 0 312 202 0 0.00%

2 - Yard Bin Compactor:
2 - Yard Bin Compactor 1/week 0 52 404 0 0.00%
2 - Yard Bin Compactor 2/week 0 104 404 0 0.00%
2 - Yard Bin Compactor 3/week 5 156 404 315,079 0.03%
2 - Yard Bin Compactor 4/week 0 208 404 0 0.00%
2 - Yard Bin Compactor 5/week 1 260 404 105,026 0.01%
2 - Yard Bin Compactor 6/week 0 312 404 0 0.00%

4 - Yard Bin:
4 - Yard Bin 1/week 507 52 808 21,299,370 2.32%
4 - Yard Bin 2/week 572 104 808 48,060,117 5.24%
4 - Yard Bin 3/week 432 156 808 54,445,727 5.94%
4 - Yard Bin 4/week 167 208 808 28,063,075 3.06%
4 - Yard Bin 5/week 85 260 808 17,854,502 1.95%
4 - Yard Bin 6/week 107 312 808 26,970,800 2.94%

4 - Yard Bin Shared:
4 - Yard Bin Shared 1/week 5 52 404 105,026 0.01%
4 - Yard Bin Shared 2/week 17 104 404 714,180 0.08%
4 - Yard Bin Shared 3/week 12 156 404 756,191 0.08%
4 - Yard Bin Shared 4/week 7 208 404 588,148 0.06%
4 - Yard Bin Shared 5/week 0 260 404 0 0.00%
4 - Yard Bin Shared 6/week 4 312 404 504,127 0.05%

4 - Yard Bin Compactor:
4 - Yard Bin Compactor 1/week 0 52 808 0 0.00%
4 - Yard Bin Compactor 2/week 4 104 808 336,085 0.04%
4 - Yard Bin Compactor 3/week 3 156 808 378,095 0.04%
4 - Yard Bin Compactor 4/week 0 208 808 0 0.00%
4 - Yard Bin Compactor 5/week 0 260 808 0 0.00%
4 - Yard Bin Compactor 6/week 0 312 808 0 0.00%
1005
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 63 Description 2029
Annual Tips Capacity
(gal)
Calculated
EBU % EBU
Allocation /Pulls (gal/yr
collected)
Multi-Family & Non-Residential (Recyclables)
2 - Yard Bin:
2 - Yard Bin 1/week 315 52 404 6,625,653 0.72%
2 - Yard Bin 2/week 121 104 404 5,080,831 0.55%
2 - Yard Bin 3/week 28 156 404 1,759,193 0.19%
2 - Yard Bin 4/week 4 208 404 357,090 0.04%
2 - Yard Bin 5/week 2 260 404 186,422 0.02%
2 - Yard Bin 6/week 2 312 404 272,369 0.03%

2 - Yard Bin Shared:
2 - Yard Bin Shared 1/week 6 52 202 63,016 0.01%
2 - Yard Bin Shared 2/week 0 104 202 0 0.00%
2 - Yard Bin Shared 3/week 0 156 202 0 0.00%
2 - Yard Bin Shared 4/week 0 208 202 0 0.00%
2 - Yard Bin Shared 5/week 0 260 202 0 0.00%
2 - Yard Bin Shared 6/week 0 312 202 0 0.00%

2 - Yard Bin Compactor:
2 - Yard Bin Compactor 1/week 1 52 404 24,699 0.00%
2 - Yard Bin Compactor 2/week 0 104 404 0 0.00%
2 - Yard Bin Compactor 3/week 3 156 404 189,048 0.02%
2 - Yard Bin Compactor 4/week 0 208 404 0 0.00%
2 - Yard Bin Compactor 5/week 0 260 404 0 0.00%
2 - Yard Bin Compactor 6/week 0 312 404 0 0.00%

4 - Yard Bin:
4 - Yard Bin 1/week 261 52 808 10,955,195 1.19%
4 - Yard Bin 2/week 128 104 808 10,728,106 1.17%
4 - Yard Bin 3/week 83 156 808 10,475,350 1.14%
4 - Yard Bin 4/week 19 208 808 3,136,324 0.34%
4 - Yard Bin 5/week 22 260 808 4,707,520 0.51%
4 - Yard Bin 6/week 17 312 808 4,322,190 0.47%

4 - Yard Bin Shared:
4 - Yard Bin Shared 1/week 3 52 404 63,016 0.01%
4 - Yard Bin Shared 2/week 3 104 404 126,499 0.01%
4 - Yard Bin Shared 3/week 1 156 404 63,016 0.01%
4 - Yard Bin Shared 4/week 0 208 404 0 0.00%
4 - Yard Bin Shared 5/week 0 260 404 0 0.00%
4 - Yard Bin Shared 6/week 0 312 404 0 0.00%

4 - Yard Bin Compactor:
4 - Yard Bin Compactor 1/week 1 52 808 42,011 0.00%
4 - Yard Bin Compactor 2/week 0 104 808 0 0.00%
4 - Yard Bin Compactor 3/week 0 156 808 0 0.00%
4 - Yard Bin Compactor 4/week 0 208 808 0 0.00%
4 - Yard Bin Compactor 5/week 0 260 808 0 0.00%
4 - Yard Bin Compactor 6/week 0 312 808 0 0.00%
1006
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 64 Description 2029
Annual Tips Capacity
(gal)
Calculated
EBU % EBU
Allocation /Pulls (gal/yr
collected)
Multi-Family & Non-Residential (Green Waste)
2 - Yard Bin:
2 - Yard Bin 1/week 2 52 404 39,210 0.00%
2 - Yard Bin 2/week 0 104 404 0 0.00%
2 - Yard Bin 3/week 0 156 404 0 0.00%
2 - Yard Bin 4/week 0 208 404 0 0.00%
2 - Yard Bin 5/week 0 260 404 0 0.00%
2 - Yard Bin 6/week 0 312 404 0 0.00%

2 - Yard Bin Shared:
2 - Yard Bin Shared 1/week 0 52 202 0 0.00%
2 - Yard Bin Shared 2/week 0 104 202 0 0.00%
2 - Yard Bin Shared 3/week 0 156 202 0 0.00%
2 - Yard Bin Shared 4/week 0 208 202 0 0.00%
2 - Yard Bin Shared 5/week 0 260 202 0 0.00%
2 - Yard Bin Shared 6/week 0 312 202 0 0.00%

2 - Yard Bin Compactor:
2 - Yard Bin Compactor 1/week 0 52 404 0 0.00%
2 - Yard Bin Compactor 2/week 0 104 404 0 0.00%
2 - Yard Bin Compactor 3/week 0 156 404 0 0.00%
2 - Yard Bin Compactor 4/week 0 208 404 0 0.00%
2 - Yard Bin Compactor 5/week 0 260 404 0 0.00%
2 - Yard Bin Compactor 6/week 0 312 404 0 0.00%

4 - Yard Bin:
4 - Yard Bin 1/week 5 52 808 195,699 0.02%
4 - Yard Bin 2/week 0 104 808 0 0.00%
4 - Yard Bin 3/week 0 156 808 0 0.00%
4 - Yard Bin 4/week 0 208 808 0 0.00%
4 - Yard Bin 5/week 0 260 808 0 0.00%
4 - Yard Bin 6/week 0 312 808 0 0.00%

4 - Yard Bin Shared:
4 - Yard Bin Shared 1/week 0 52 404 0 0.00%
4 - Yard Bin Shared 2/week 0 104 404 0 0.00%
4 - Yard Bin Shared 3/week 0 156 404 0 0.00%
4 - Yard Bin Shared 4/week 0 208 404 0 0.00%
4 - Yard Bin Shared 5/week 0 260 404 0 0.00%
4 - Yard Bin Shared 6/week 0 312 404 0 0.00%

4 - Yard Bin Compactor:
4 - Yard Bin Compactor 1/week 0 52 808 0 0.00%
4 - Yard Bin Compactor 2/week 0 104 808 0 0.00%
4 - Yard Bin Compactor 3/week 0 156 808 0 0.00%
4 - Yard Bin Compactor 4/week 0 208 808 0 0.00%
4 - Yard Bin Compactor 5/week 0 260 808 0 0.00%
4 - Yard Bin Compactor 6/week 0 312 808 0 0.00%
1007
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 65 Description 2029
Capacity (gal) Calculated
EBU % EBU
Allocation (gal/yr
collected)
Commercial Roll Off Container Accounts:
10 yard Refuse 0 2,020 0 0.00%
10 yard Recyclables And Green Waste 0 2,020 0 0.00%

13.4 yard Refuse 1,476 2,706 3,994,723 0.44%

13.4 yard Recyclables And Green Waste 468 2,706 1,266,619 0.14% 20 yard Compacted Refuse 36 4,039 145,421 0.02%
20 yard Compacted Recyclables And Green
Waste 0 4,039 0 0.00%
30 yard Refuse 4,195 6,059 25,418,428 2.77%
30 yard Recyclables And Green Waste 350 6,059 2,120,727 0.23% 30 yard Compacted Refuse 892 6,059 5,404,824 0.59%
30 yard compacted Recyclables And Green
Waste 22 6,059 133,303 0.01%
(2)30 yard Single Pickup Refuse 0 6,059 0 0.00%
(2)30 yard Single Pickup Recyclables And
Green Waste 0 6,059 0 0.00%
40 yard Refuse 2,317 8,079 18,718,950 2.04%
40 yard Compacted Refuse 1,182 8,079 9,549,331 1.04%
40 yard Compacted Recyclables And Green
Waste 59 8,079 476,659 0.05%

5.3. Rate Design
This section on the rate design will present how we calculate the cost of service rates for the Fiscal Years 2025- 2029. The methodology starts with the cost of service for the Fiscal Year 2029, then the Revenue Adjustment are applied to determine the prior fiscal year rates and develop the rate schedule. Table 52 presents a recap of the calculated unit cost per EBU for the residential and commercial class as was represented earlier in Table 49. (Remainder of page intentionally left blank)
1008
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 66 Table 53: Calculated Unit Cost per Equivalent Billing Unit (EBU) Collection Categories OpEx Debt Income &
Funds
Net
Revenue
Req
EBU's Unit
Costs
Residential Containers - Trash $6,625,303 $584,182 $476,163 $7,072,518 181,561,267 $0.0391 Residential Containers - Recycling $3,745,040 $2,778,318 $2,204,124 $4,536,818 175,813,715 $0.0259 Residential Containers - Green Waste $3,745,040 $463,503 $158,592 $4,253,969 175,813,715 $0.0243 Commercial Container Trash Service (96 gal) $81,936 $60,127 $4,097 $144,916 2,068,768 $0.0700 Commercial Container Trash $10,403,803 $603,635 $275,376 $11,272,697 255,203,844 $0.0442 Commercial Container Organic (64 gal) $48,195 $119,609 $4,372 $171,665 1,697,141 $0.1011 Commercial Container Recycling & GW $1,661,020 $881,993 $740,534 $1,893,281 60,047,438 $0.0319 Industrial Roll-off Collection Only $3,152,831 $390,391 $132,298 $3,582,752 67,228,985 $325.79

Disposal Categories
MSW $28,076,417 $597,682 $1,120,141 $28,942,006 254,954 $113.52 Recycling $1,307,558 $30,713 $71,148 $1,330,956 24,872 $53.51 Green Waste $2,312,532 $41,291 $86,546 $2,381,492 18,663 $127.61 C&D1 $4,013 $142 $201 $4,153 n/a n/a
Organics $679,313 $7,429 $22,039 $698,188 3,358 $207.92

Total $61,843,001 $6,559,016 $5,295,631 $66,285,411
_______
1 The City doesn’t process significant quantities of C&D and therefore an alternative methodology based on the average cost per ton of the ER tipping Floor and waste haul transfer plus the direct cost of disposal at the City’s disposal site was developed.

The unit costs calculated in Table 53 are factored based on the various rates proposed within this study based on the associated type of service and level of service. Example calculations of the rate design methodology in support of the proposed rates is included in Appendix D.

Table 54: C&D Tipping Fee Determination
FY2025 FY2026 FY2027 FY2028 FY2029
Description Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28
ER Tip Floor Processing1 $3,487,261 $3,593,792 $3,626,069 $3,659,329 $3,693,600 ER Waste Transfer Haul $6,099,887 $5,359,083 $6,828,516 $6,919,916 $7,013,602 Total Cost $9,587,148 $8,952,875 $10,454,585 $10,579,245 $10,707,202 Total Tip Floor Tons 293,968 293,968 293,968 293,968 293,968 Average Unit Cost $32.61 $30.46 $35.56 $35.99 $36.42
Simi Landfill Disposal Cost2 $95.5 $98.37 $101.32 $104.36 $107.49 $110.71 Proposed Fee N/A $130.98 $131.78 $139.92 $143.48 $147.13

Current C&D Fee $66.92
_________
1 Excludes disposal costs and reflects the tip floor processing costs only. 2 Costs allocated at 3% annually for inflation.
1009
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 67

5.4. Proposed 5-Year Solid Waste (refuse) Enterprise
Fund Rate Schedule
Tables 55– 68 show the proposed 5-year schedule of solid waste rates.

Table 55: Proposed Five - Year Residential Monthly Solid Waste, Recycling, Organics / Green Waste 3-Cart Service (1x Week Collection)
Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 Cart Service/64-gallon – per Unit $24.70 $39.33 $43.23 $45.48 $46.83 $47.12 3 Cart Service/96-gallon – per Unit $30.78 $47.41 $52.11 $54.83 $56.46 $56.89 Extra 96 Gallon Cart Service – Per Cart $11.34 $24.45 $26.88 $28.28 $29.13 $29.41 Multi-Family Residential 2 Units $58.51 Proposing to eliminate these service rates as the multi-family 4 units and less 3-cart curbside collection rate structure is combined with residential curbside 3-cart service listed above.

Multi-Family Residential 3 Units $84.73
Multi-Family Residential 4 Units $109.43
Table 56: Proposed Five - Year Residential Mobile Home Monthly Solid Waste, Recycling, Organics / Green Waste 3-Cart Service (1x Week Collection) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 Cart Service/64-gallon – per Unit N/A $36.06 $39.63 $41.69 $42.93 $43.16 3 Cart Service/96-gallon – per Unit N/A $43.45 $47.76 $50.25 $51.74 $52.10 Extra 96 Gallons Cart Service N/A $22.41 $24.63 $25.92 $26.70 $26.96 Table 57: Proposed Five-Year Schedule of SOLID WASTE Service Rates for Multi-Family Residential (MFR) >4 units and Commercial Service by Frequency and Container Size (in CY) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 cu yd bin 1x/week N/A $57.69 $63.44 $66.77 $68.77 $69.67 2x/week N/A $115.20 $126.71 $133.36 $137.35 $139.22
3x/week N/A $172.72 $189.98 $199.95 $205.94 $208.76
4x/week N/A $230.24 $253.25 $266.54 $274.53 $278.31
5x/week N/A $287.75 $316.52 $333.13 $343.12 $347.86
6x/week N/A $345.27 $379.78 $399.72 $411.70 $417.41

1 cu yd-shared 1x/week N/A $28.84 $31.72 $33.38 $34.38 $34.83 2x/week N/A $57.60 $63.36 $66.68 $68.68 $69.61
3x/week N/A $86.36 $94.99 $99.97 $102.97 $104.38
4x/week N/A $115.12 $126.62 $133.27 $137.26 $139.16
5x/week N/A $143.88 $158.26 $166.56 $171.56 $173.93
6x/week N/A $172.63 $189.89 $199.86 $205.85 $208.70
Table 56 Continued to following page.
1010
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 68 Table 57 Continued SOLID WASTE Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 cu yd-compactor 1x/week N/A $83.23 $91.54 $96.34 $99.23 $100.56 2x/week N/A $166.29 $182.91 $192.51 $198.28 $200.99
3x/week N/A $249.35 $274.28 $288.67 $297.33 $301.43
4x/week N/A $332.41 $365.64 $384.83 $396.37 $401.86
5x/week N/A $415.48 $457.01 $481.00 $495.42 $502.30
6x/week N/A $498.54 $548.38 $577.16 $594.47 $602.73

2 cu yd 1x/week $132.76 $115.25 $126.77 $133.41 $137.41 $139.22 2x/week $232.25 $230.29 $253.30 $266.59 $274.59 $278.31 3x/week $298.56 $345.32 $379.84 $399.77 $411.76 $417.41 4x/week $364.87 $460.35 $506.37 $532.95 $548.94 $556.50 5x/week $431.21 $575.38 $632.91 $666.13 $686.11 $695.60 6x/week $497.53 $690.42 $759.45 $799.31 $823.29 $834.69

2 cu yd-shared 1x/week $66.44 $57.63 $63.38 $66.71 $68.71 $69.61 2x/week $116.18 $115.14 $126.65 $133.30 $137.29 $139.16 3x/week $149.37 $172.66 $189.92 $199.89 $205.88 $208.70 4x/week $182.51 $230.18 $253.19 $266.48 $274.47 $278.25 5x/week $215.67 $287.69 $316.46 $333.07 $343.06 $347.80 6x/week $248.83 $345.21 $379.72 $399.66 $411.64 $417.35

2 cu yd-compactor 1x/week $284.35 $166.34 $182.96 $192.56 $198.34 $200.99 2x/week $497.34 $332.46 $365.70 $384.89 $396.43 $401.86 3x/week $639.64 $498.59 $548.43 $577.22 $594.53 $602.73 4x/week $781.75 $664.71 $731.17 $769.55 $792.63 $803.61 5x/week $923.88 $830.83 $913.90 $961.88 $990.73 $1,004.48 6x/week $1,065.99 $996.95 $1,096.64 $1,154.20 $1,188.83 $1,205.35

3 cu yd 1x/week N/A $172.82 $190.09 $200.06 $206.06 $208.76 2x/week N/A $345.37 $379.89 $399.83 $411.82 $417.41
3x/week N/A $517.92 $569.70 $599.60 $617.58 $626.05
4x/week N/A $690.47 $759.50 $799.37 $823.35 $834.69
5x/week N/A $863.02 $949.31 $999.14 $1,029.11 $1,043.33 6x/week N/A $1,035.57 $1,139.11 $1,198.91 $1,234.87 $1,251.98

3 cu yd-shared 1x/week N/A $86.41 $95.04 $100.03 $103.03 $104.38 2x/week N/A $172.68 $189.95 $199.92 $205.91 $208.70
3x/week N/A $258.96 $284.85 $299.80 $308.79 $313.02
4x/week N/A $345.23 $379.75 $399.68 $411.67 $417.35
5x/week N/A $431.51 $474.65 $499.57 $514.55 $521.67
6x/week N/A $517.78 $569.56 $599.45 $617.44 $625.99
Table 57 Continued to following page.
1011
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 69 Table 57 Continued SOLID WASTE Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 cu yd-compactor 1x/week N/A $249.45 $274.39 $288.78 $297.44 $301.43 2x/week N/A $498.64 $548.49 $577.28 $594.59 $602.73
3x/week N/A $747.82 $822.59 $865.77 $891.74 $904.04
4x/week N/A $997.00 $1,096.69 $1,154.26 $1,188.88 $1,205.35 5x/week N/A $1,246.19 $1,370.79 $1,442.75 $1,486.03 $1,506.65 6x/week N/A $1,495.37 $1,644.89 $1,731.24 $1,783.18 $1,807.96

4 cu yd 1x/week $230.86 $230.29 $253.30 $266.59 $274.59 $278.31 2x/week $403.90 $460.35 $506.37 $532.95 $548.94 $556.50 3x/week $519.26 $690.42 $759.45 $799.31 $823.29 $834.69 4x/week $634.63 $920.48 $1,012.52 $1,065.67 $1,097.64 $1,112.88 5x/week $749.98 $1,150.55 $1,265.59 $1,332.03 $1,371.99 $1,391.07 6x/week $865.36 $1,380.62 $1,518.66 $1,598.39 $1,646.34 $1,669.26

4 cu yd-shared 1x/week $115.47 $115.14 $126.65 $133.30 $137.29 $139.16 2x/week $202.02 $230.18 $253.19 $266.48 $274.47 $278.25 3x/week $259.70 $345.21 $379.72 $399.66 $411.64 $417.35 4x/week $317.36 $460.24 $506.26 $532.84 $548.82 $556.44 5x/week $375.06 $575.27 $632.80 $666.01 $685.99 $695.54 6x/week $432.71 $690.31 $759.33 $799.19 $823.17 $834.63

4 cu yd-compactor 1x/week $464.93 $332.46 $365.70 $384.89 $396.43 $401.86 2x/week $813.53 $664.71 $731.17 $769.55 $792.63 $803.61 3x/week $1,045.93 $996.95 $1,096.64 $1,154.20 $1,188.83 $1,205.35 4x/week $1,278.32 $1,329.20 $1,462.11 $1,538.86 $1,585.02 $1,607.09 5x/week $1,510.72 $1,661.44 $1,827.57 $1,923.52 $1,981.22 $2,008.83 6x/week $1,743.12 $1,993.69 $2,193.04 $2,308.17 $2,377.41 $2,410.58

(Remainder of page intentionally left blank)
1012
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 70 Table 58: Proposed Five-Year Schedule of RECYCLE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 cu yd bin 1x/week N/A $27.28 $30.00 $31.57 $32.51 $32.90 2x/week N/A $54.39 $59.82 $62.95 $64.84 $65.69
3x/week N/A $81.51 $89.64 $94.34 $97.17 $98.47
4x/week N/A $108.62 $119.47 $125.73 $129.50 $131.25
5x/week N/A $135.73 $149.29 $157.12 $161.83 $164.04
6x/week N/A $162.84 $179.11 $188.51 $194.16 $196.82

1 cu yd-shared 1x/week N/A $13.64 $15.00 $15.78 $16.25 $16.45 2x/week N/A $27.20 $29.91 $31.48 $32.42 $32.84
3x/week N/A $40.75 $44.82 $47.17 $48.59 $49.23
4x/week N/A $54.31 $59.73 $62.87 $64.75 $65.63
5x/week N/A $67.86 $74.64 $78.56 $80.92 $82.02
6x/week N/A $81.42 $89.56 $94.26 $97.08 $98.41

1 cu yd-compactor 1x/week N/A $31.33 $34.45 $36.25 $37.33 $37.80 2x/week N/A $62.49 $68.72 $72.32 $74.49 $75.47
3x/week N/A $93.64 $103.00 $108.40 $111.65 $113.15
4x/week N/A $124.80 $137.27 $144.47 $148.80 $150.82
5x/week N/A $155.96 $171.54 $180.54 $185.96 $188.50
6x/week N/A $187.12 $205.82 $216.62 $223.11 $226.17

2 cu yd 1x/week $62.48 $54.44 $59.88 $63.01 $64.90 $65.69 2x/week $109.24 $108.67 $119.52 $125.79 $129.56 $131.25 3x/week $140.43 $162.89 $179.17 $188.57 $194.22 $196.82 4x/week $171.60 $217.11 $238.81 $251.34 $258.88 $262.38 5x/week $202.78 $271.34 $298.46 $314.12 $323.54 $327.95 6x/week $233.96 $325.56 $358.11 $376.90 $388.20 $393.52

2 cu yd-shared 1x/week $31.29 $27.22 $29.94 $31.51 $32.45 $32.84 2x/week $54.68 $54.33 $59.76 $62.89 $64.78 $65.63
3x/week $70.28 $81.45 $89.58 $94.28 $97.11 $98.41
4x/week $85.85 $108.56 $119.41 $125.67 $129.44 $131.19
5x/week $101.45 $135.67 $149.23 $157.06 $161.77 $163.98 6x/week $117.03 $162.78 $179.05 $188.45 $194.10 $196.76

2 cu yd-compactor 1x/week $133.74 $62.54 $68.78 $72.38 $74.55 $75.47 2x/week $233.96 $124.85 $137.32 $144.53 $148.86 $150.82 3x/week $300.77 $187.17 $205.87 $216.67 $223.17 $226.17 4x/week $367.58 $249.48 $274.42 $288.82 $297.48 $301.53 5x/week $434.38 $311.80 $342.97 $360.97 $371.79 $376.88 6x/week $501.19 $374.12 $411.52 $433.11 $446.10 $452.23 Table 58 Continued to following page.
1013
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 71 Table 58 Continued RECYCLE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 cu yd 1x/week N/A $81.60 $89.75 $94.46 $97.29 $98.47
2x/week N/A $162.94 $179.22 $188.62 $194.28 $196.82
3x/week N/A $244.28 $268.69 $282.79 $291.27 $295.17
4x/week N/A $325.61 $358.16 $376.96 $388.26 $393.52
5x/week N/A $406.95 $447.63 $471.12 $485.25 $491.87
6x/week N/A $488.28 $537.10 $565.29 $582.25 $590.21

3 cu yd-shared 1x/week N/A $40.80 $44.88 $47.23 $48.64 $49.23 2x/week N/A $81.47 $89.61 $94.31 $97.14 $98.41
3x/week N/A $122.14 $134.35 $141.40 $145.64 $147.58
4x/week N/A $162.81 $179.08 $188.48 $194.13 $196.76
5x/week N/A $203.47 $223.81 $235.56 $242.63 $245.93
6x/week N/A $244.14 $268.55 $282.65 $291.12 $295.11

3 cu yd-compactor 1x/week N/A $93.74 $103.11 $108.51 $111.76 $113.15 2x/week N/A $187.22 $205.93 $216.73 $223.23 $226.17
3x/week N/A $280.69 $308.75 $324.95 $334.70 $339.20
4x/week N/A $374.17 $411.57 $433.17 $446.16 $452.23
5x/week N/A $467.64 $514.39 $541.39 $557.63 $565.26
6x/week N/A $561.11 $617.21 $649.61 $669.10 $678.28

4 cu yd 1x/week $108.58 $108.67 $119.52 $125.79 $129.56 $131.25 2x/week $189.95 $217.11 $238.81 $251.34 $258.88 $262.38 3x/week $244.80 $325.56 $358.11 $376.90 $388.20 $393.52 4x/week $298.40 $434.01 $477.40 $502.46 $517.53 $524.65 5x/week $352.63 $542.46 $596.69 $628.01 $646.85 $655.78 6x/week $406.87 $650.90 $715.98 $753.57 $776.17 $786.91

4 cu yd-shared 1x/week $54.35 $54.33 $59.76 $62.89 $64.78 $65.63 2x/week $95.03 $108.56 $119.41 $125.67 $129.44 $131.19
3x/week $122.15 $162.78 $179.05 $188.45 $194.10 $196.76 4x/week $149.26 $217.00 $238.70 $251.23 $258.76 $262.32 5x/week $176.39 $271.23 $298.35 $314.01 $323.42 $327.89 6x/week $203.48 $325.45 $357.99 $376.78 $388.08 $393.46

4 cu yd-compactor 1x/week $218.62 $124.85 $137.32 $144.53 $148.86 $150.82 2x/week $382.51 $249.48 $274.42 $288.82 $297.48 $301.53 3x/week $491.77 $374.12 $411.52 $433.11 $446.10 $452.23 4x/week $601.02 $498.75 $548.61 $577.41 $594.73 $602.93 5x/week $709.99 $623.38 $685.71 $721.70 $743.35 $753.63 6x/week $819.53 $748.01 $822.80 $865.99 $891.97 $904.34 1014
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 72 Table 59: Proposed Five-Year Schedule of GREENWASTE Service Rates for Multi-Family Residential (MFR) >4 units and Commercial Service by Frequency and Container Size (in CY) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 cu yd bin 1x/week N/A $29.69 $32.64 $34.35 $35.38 $35.81 2x/week N/A $59.21 $65.11 $68.53 $70.58 $71.50
3x/week N/A $88.72 $97.58 $102.70 $105.78 $107.20
4x/week N/A $118.24 $130.05 $136.88 $140.98 $142.89
5x/week N/A $147.76 $162.52 $171.05 $176.18 $178.58
6x/week N/A $177.28 $194.99 $205.22 $211.38 $214.27

1 cu yd-shared 1x/week N/A $14.84 $16.32 $17.18 $17.69 $17.91 2x/week N/A $29.60 $32.56 $34.26 $35.29 $35.75
3x/week N/A $44.36 $48.79 $51.35 $52.89 $53.60
4x/week N/A $59.12 $65.03 $68.44 $70.49 $71.44
5x/week N/A $73.88 $81.26 $85.52 $88.09 $89.29
6x/week N/A $88.64 $97.50 $102.61 $105.69 $107.14

1 cu yd-compactor 1x/week N/A $36.14 $39.74 $41.82 $43.07 $43.61 2x/week N/A $72.11 $79.31 $83.47 $85.97 $87.11
3x/week N/A $108.08 $118.88 $125.11 $128.86 $130.60
4x/week N/A $144.05 $158.44 $166.76 $171.76 $174.10
5x/week N/A $180.02 $198.01 $208.40 $214.65 $217.59
6x/week N/A $215.99 $237.58 $250.05 $257.54 $261.09

2 cu yd 1x/week $62.48 $59.26 $65.17 $68.58 $70.64 $71.50 2x/week $109.24 $118.29 $130.11 $136.93 $141.04 $142.89 3x/week $140.43 $177.33 $195.05 $205.28 $211.44 $214.27 4x/week $171.60 $236.36 $259.99 $273.63 $281.84 $285.66 5x/week $202.78 $295.40 $324.93 $341.98 $352.24 $357.04 6x/week $233.96 $354.44 $389.87 $410.33 $422.63 $428.43

2 cu yd-shared 1x/week $31.29 $29.63 $32.58 $34.29 $35.32 $35.75 2x/week $54.68 $59.15 $65.05 $68.47 $70.52 $71.44
3x/week $70.28 $88.66 $97.52 $102.64 $105.72 $107.14
4x/week $85.85 $118.18 $129.99 $136.82 $140.92 $142.83
5x/week $101.45 $147.70 $162.46 $170.99 $176.12 $178.52 6x/week $117.03 $177.22 $194.93 $205.16 $211.32 $214.21

2 cu yd-compactor 1x/week $133.74 $72.16 $79.36 $83.52 $86.03 $87.11 2x/week $233.96 $144.10 $158.50 $166.81 $171.81 $174.10 3x/week $300.77 $216.04 $237.63 $250.10 $257.60 $261.09 4x/week $367.58 $287.98 $316.77 $333.39 $343.39 $348.08 5x/week $434.38 $359.92 $395.90 $416.68 $429.18 $435.07 6x/week $501.19 $431.86 $475.04 $499.97 $514.97 $522.05 Table 59 Continued to following page.
1015
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 73 Table 59 Continued GREENWASTE Service Rates for Multi-Family Residential (MFR) > 4 units and Commercial Service by Frequency and Container Size (in cubic yards) Fiscal Year > FY2025 FY2026 FY2027 FY2028 FY2029
Effective Date > Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 3 cu yd 1x/week N/A $88.82 $97.69 $102.82 $105.90 $107.20 2x/week N/A $177.38 $195.10 $205.34 $211.50 $214.27
3x/week N/A $265.93 $292.51 $307.86 $317.09 $321.35
4x/week N/A $354.48 $389.92 $410.39 $422.69 $428.43
5x/week N/A $443.04 $487.33 $512.91 $528.29 $535.51
6x/week N/A $531.59 $584.74 $615.43 $633.89 $642.58

3 cu yd-shared 1x/week N/A $44.41 $48.85 $51.41 $52.95 $53.60 2x/week N/A $88.69 $97.55 $102.67 $105.75 $107.14
3x/week N/A $132.97 $146.26 $153.93 $158.55 $160.68
4x/week N/A $177.24 $194.96 $205.19 $211.35 $214.21
5x/week N/A $221.52 $243.67 $256.45 $264.15 $267.75
6x/week N/A $265.80 $292.37 $307.72 $316.95 $321.29

3 cu yd-compactor 1x/week N/A $108.18 $118.99 $125.23 $128.98 $130.60 2x/week N/A $216.09 $237.69 $250.16 $257.66 $261.09
3x/week N/A $324.00 $356.39 $375.09 $386.34 $391.57
4x/week N/A $431.91 $475.09 $500.03 $515.03 $522.05
5x/week N/A $539.82 $593.80 $624.96 $643.71 $652.54
6x/week N/A $647.74 $712.50 $749.90 $772.39 $783.02

4 cu yd 1x/week $108.58 $118.29 $130.11 $136.93 $141.04 $142.89 2x/week $189.95 $236.36 $259.99 $273.63 $281.84 $285.66 3x/week $244.80 $354.44 $389.87 $410.33 $422.63 $428.43 4x/week $298.40 $472.51 $519.75 $547.03 $563.43 $571.20 5x/week $352.63 $590.58 $649.63 $683.72 $704.23 $713.97 6x/week $406.87 $708.65 $779.50 $820.42 $845.03 $856.74

4 cu yd-shared 1x/week $54.35 $59.15 $65.05 $68.47 $70.52 $71.44 2x/week $95.03 $118.18 $129.99 $136.82 $140.92 $142.83
3x/week $122.15 $177.22 $194.93 $205.16 $211.32 $214.21 4x/week $149.26 $236.25 $259.87 $273.51 $281.72 $285.60 5x/week $176.39 $295.29 $324.81 $341.86 $352.12 $356.98 6x/week $203.48 $354.33 $389.75 $410.21 $422.52 $428.37

4 cu yd-compactor 1x/week $218.62 $144.10 $158.50 $166.81 $171.81 $174.10 2x/week $382.51 $287.98 $316.77 $333.39 $343.39 $348.08 3x/week $491.77 $431.86 $475.04 $499.97 $514.97 $522.05 4x/week $601.02 $575.75 $633.31 $666.55 $686.54 $696.03 5x/week $709.99 $719.63 $791.58 $833.13 $858.12 $870.01 6x/week $819.53 $863.51 $949.85 $999.71 $1,029.70 $1,043.99 1016
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 74 Table 60: Proposed Five-Year Schedule of ORGANICS Service Rates for Multi-Family Residential (MFR) greater than 4 units and Commercial Service by Frequency and Container Size (in cubic yards)
FY2025 FY2026 FY2027 FY2028 FY2029
Cart & Bin Size Frequency Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 64-gallon 3x/week $63.80 $79.01 $86.90 $91.45 $94.19 $95.39 1 cu yd 1x/week N/A $83.11 $91.40 $96.20 $99.08 $100.34 2 cu yd 1x/week N/A $166.09 $182.69 $192.27 $198.04 $200.56 3 cu yd 1x/week N/A $249.08 $273.97 $288.35 $297.00 $300.77 4 cu yd 1x/week N/A $332.06 $365.26 $384.43 $395.96 $400.99 Table 61: Proposed Five-Year Schedule of SOLID WASTE Service Rates for 1x/ Week Commercial Cart Service by Quantity of Carts
FY2025 FY2026 FY2027 FY2028 FY2029
# of Carts / Size Frequency Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 1 96-gallon cart 1x/week $43.53 $36.51 $40.15 $42.26 $43.52 $44.01 2 96-gallon carts 1x/week $76.16 $73.03 $80.31 $84.51 $87.04 $88.01 3 96-gallon carts 1x/week $97.94 $109.54 $120.46 $126.77 $130.56 $132.02 4 96-gallon carts 1x/week $119.73 $146.06 $160.61 $169.02 $174.08 $176.03 5 96-gallon carts 1x/week $141.51 $182.57 $200.77 $211.28 $217.60 $220.04 6 96-gallon carts 1x/week $247.16 $219.09 $240.92 $253.53 $261.12 $264.04 Table 62: Proposed Five-Year Schedule of SERVICE PULL Rates for Industrial Collection FY2025 FY2026 FY2027 FY2028 FY2029
Bin Size / Service Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 Up to 10 CY / Refuse $147.73 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 10 CY / Recycle & Green Waste $73.87 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 13.4 CY / Refuse $147.73 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 13.4 CY / Recycle & Green Waste $73.87 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 20 CY Bin N/A $269.43 $296.38 $311.94 $321.30 $325.79 Up to 20 CY Compactor / Refuse $192.85 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 20 CY Compactor / Recycle & GW $96.32 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 30 CY Bin / Refuse $193.56 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 30 CY Bin / Recycle & GW $96.32 $269.43 $296.38 $311.94 $321.30 $325.79 30 CY Compactor / Refuse $219.04 $269.43 $296.38 $311.94 $321.30 $325.79 30 CY Compactor / Recycle & GW $109.52 $269.43 $296.38 $311.94 $321.30 $325.79 (Two / 2) 30 CY Bins / Refuse $371.86 N/A N/A N/A N/A N/A (Two / 2) 30 CY Bins / Recycle & GW $185.93 N/A N/A N/A N/A N/A 40 CY Bin / Refuse $238.84 $269.43 $296.38 $311.94 $321.30 $325.79 40 CY Compactor / Refuse $269.98 $269.43 $296.38 $311.94 $321.30 $325.79 40 CY Compactor / Recycle & GW $134.99 $269.43 $296.38 $311.94 $321.30 $325.79 1017
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 75 Table 63: Proposed Five-Year Schedule of Monthly and Daily Rental Rates for Industrial Bins FY2025 FY2026 FY2027 FY2028 FY2029
Description Frequency Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 10 cu yd Roll Off Bin Monthly N/A $46.45 $47.84 $49.28 $50.76 $52.28 Daily N/A $1.53 $1.57 $1.62 $1.67 $1.72

13.4 cu yd Roll Off Bin Monthly N/A $49.99 $51.49 $53.03 $54.62 $56.26 Daily N/A $1.64 $1.69 $1.74 $1.80 $1.85
20 cu yd Roll Off Bin Monthly N/A $67.30 $69.32 $71.40 $73.54 $75.75 Daily N/A $2.21 $2.28 $2.35 $2.42 $2.49
30 cu yd Roll Off Bin Monthly N/A $58.05 $59.79 $61.58 $63.43 $65.33 Daily N/A $1.91 $1.97 $2.02 $2.09 $2.15
40 cu yd Roll Off Bin Monthly N/A $66.48 $68.47 $70.52 $72.64 $74.82 Daily N/A $2.19 $2.25 $2.32 $2.39 $2.46
40 cu yd Sealed Roll Off Bin Monthly N/A $87.09 $89.70 $92.39 $95.16 $98.01 Daily N/A $2.86 $2.95 $3.04 $3.13 $3.22
Table 64: Proposed Five-Year Schedule of SOLID WASTE Walking Floor Transfer Trailer Rates for Industrial Service per Pull/Transfer
FY2025 FY2026 FY2027 FY2028 FY2029
Description Current 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28
53-Foot Walking Floor Trailer $371.85 $384.86 $398.34 $412.28 $426.71 $441.64 Note this service rate is a specific rate for an industrial customer receiving direct haul service to the Simi Landfill from the Customers Property located within the City.

Table 65: Proposed Five-Year Schedule of Del Norte and Industrial TIPPING FEES per Ton of Weighed Material and the Security and Contamination Prevention Fee Description Material Type Current July 1,
‘24
July 1,
‘25
July 1,
‘26
July 1,
‘27
July 1,
‘28
Del Norte Tip Fee Solid Waste $55.59 $93.88 $103.27 $108.69 $111.95 $113.52 Del Norte Tip Fee Recycling N/A $44.26 $48.68 $51.24 $52.77 $53.51 Del Norte Tip Fee Green Waste $62.81 $105.53 $116.08 $122.18 $125.84 $127.61 Del Norte Tip Fee Organics N/A $171.95 $189.14 $199.08 $205.05 $207.92 Del Norte Tip Fee C&D $66.92 $130.98 $131.78 $139.92 $143.48 $147.13 Del Norte Tip Fee Tires $180.00 $272.00 $280.16 $288.56 $297.22 $306.14 Walking Floor Transfer
Trailer Tip Fee1 Solid Waste N/A $34.63 $35.67 $36.74 $37.84 $38.98 Security and Contamination
Prevention Fee (Per Bin)2 All Containers $0.12 $0.12 $0.12 $0.12 $0.12 $0.12 ____________
1 Represents the tip fee for walking floor trailers direct hauled to the Simi Landfill. This rate is not applicable to refuse delivered to the Del Norte facility.
2 The City charges a security and contamination prevention fee to all customers per bin per month. In most cases the fee is included in the collection rate for service, however for industrial customers the collection rate is per pull and in some cases the customer may own the bin.

Therefore the rates shown are applied in instances where the industrial customer does not rent a bin from the City. 1018
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 76 Table 66: Proposed Five-Year Schedule of Commercial Bin Rental Service for Construction and Demolition Projects for 10 Cubic Yards and Larger Bins

CURRENT FEES
Container Material Delivery Per
Empty
Initial
Cost
Disposal
Min. Prepay
10 Cubic
Yard Dirt and Concrete Only $15.00 $102.30 $117.30 $166.77 $284.07

13.4 Cubic
Yard
Roofing Materials / Green
Waste $15.00 $102.30 $117.30 $166.77 $284.07
30 Cubic
Yard
Roofing Materials / Green
Waste $15.00 $137.88 $152.88 $166.77 $319.65
40 Cubic yard
Roofing Materials / Green
Waste $15.00 $172.35 $187.35 $166.77 $354.12
Other Related Fees:
$15.00 rental fee/day if minimum pickup of 2 times per month is not met – for construction rental only $55.59 per ton for household trash and green waste
$65.00 per ton for construction &/or demolition materials $27.80 minimum charge for up to 1/2 ton
PROPOSED FEES1
FY2025 FY2026 FY2027 FY2028 FY2029
Proposed Fees Material 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 Fee Per Pull
10 Cubic Yard Dirt and Concrete Only $269.43 $296.38 $311.94 $321.30 $325.79

13.4 Cubic
Yard Roofing Materials / Green Waste $269.43 $296.38 $311.94 $321.30 $325.79 30 Cubic Yard Roofing Materials / Green Waste $269.43 $296.38 $311.94 $321.30 $325.79 40 Cubic yard Roofing Materials / Green Waste $269.43 $296.38 $311.94 $321.30 $325.79 Bin Rental Fees2
10 cu yd Roll Off Bin $1.53 $1.57 $1.62 $1.67 $1.72

13.4 cu yd Roll Off Bin $1.64 $1.69 $1.74 $1.80 $1.85
20 cu yd Roll Off Bin $2.21 $2.28 $2.35 $2.42 $2.49
30 cu yd Roll Off Bin $1.91 $1.97 $2.02 $2.09 $2.15
40 cu yd Roll Off Bin $2.19 $2.25 $2.32 $2.39 $2.46
40 cu yd Roll Off Bin Sealed $2.86 $2.95 $3.04 $3.13 $3.22 Del Norte Tip Fees3
Refuse $93.88 $103.27 $108.69 $111.95 $113.52
Recycling $44.26 $48.68 $51.24 $52.77 $53.51
Green Waste $105.53 $116.08 $122.18 $125.84 $127.61
Organics $171.95 $189.14 $199.08 $205.05 $207.92
C&D $130.98 $131.78 $139.92 $143.48 $147.13
Minimum
Disposal Charge $28.41 $29.26 $30.14 $31.04 $31.97
____________
1 Contingent upon service availability by the City, additional service charges may apply such as collection of bulky items or tires. 2 Amounts shown derived from Table 62 and represent daily rental rates. 3 Amounts shown derived from Table 64.
1019
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 77 Table 67: Proposed Five-Year Schedule of Commercial Bin Rental Service for Construction and Demolition Projects for 2 and 4 Cubic Yard Bins

CURRENT FEES
Container Material Delivery Per
Empty
Initial
Cost
Disposal
Min. Prepay
2 Cubic Yard Small items, green waste, lumber $15.00 $50.00 $65.00 n/a n/a 4 Cubic Yard Small items, green waste, lumber $15.00 $75.00 $90.00 n/a n/a PROPOSED FEES1
FY2025 FY2026 FY2027 FY2028 FY2029
Proposed Fees Material 7/1/24 7/1/25 7/1/26 7/1/27 7/1/28 Fee Per Pull
2 Cubic Yard No furniture, no mattresses or
appliances. No dirt or concrete.

Small items, green waste, lumber
& miscellaneous okay.
$43.87 $46.25 $48.12 $49.73 $51.14
4 Cubic Yard $56.83 $60.50 $63.12 $65.18 $66.81
Bin Rental Fees2
2cu yd Bin $0.24 $0.25 $0.26 $0.27 $0.28
4 cu yd Bin $0.30 $0.31 $0.32 $0.33 $0.34
____________
1 Contingent upon service availability by the City, additional service charges may apply such as collection of bulky items or tires. 2 Amounts shown are daily rental rates.

Table 68: Proposed Five-Year Schedule of Miscellaneous Service Fees Current 2025 2026 2027 2028 2029
Return Pick-up / Extra Pick-up - Automatic Side Loader $11.74 $29.78 $30.67 $31.59 $32.54 $33.52 Return Pick-up / Extra Pick-up - Front Loader $40.00 $42.64 $43.92 $45.24 $46.60 $48.00 Minimum Gate Fee $27.80 $28.41 $29.26 $30.14 $31.04 $31.97 Bulky Pick-up (Up to 5 Items)1 $35.00 $45.00 $46.35 $47.74 $49.17 $50.65 __________
1 Please note that for Residential 3 cart service (including Mobile Homes) customers receive 1 bulky items pickup (up to 5 items) per year at no additional charge as noted in Tables 2 and 3.

Table 69: Proposed Fees for Replacement for Neglect, Damaged, or Missing Containers Miscellaneous Fees Current 2025 2026 2027 2028 2029
Residential 96-gallon container $51.25 $65.04 $66.99 $69.00 $71.07 $73.20 Residential 64-gallon containers $47.35 $57.50 $59.23 $61.01 $62.84 $64.73 Commercial 1-cubic yard (lined) n/a $1,111.00 $1,144.33 $1,178.66 $1,214.02 $1,250.44 Commercial 2-cubic yard (lined) $445.12 $1,269.00 $1,307.07 $1,346.28 $1,386.67 $1,428.27 Commercial 3-cubic yard (lined) n/a $1,399.00 $1,440.97 $1,484.20 $1,528.73 $1,574.59 Commercial 4-cubic yard (lined) $542.80 $1,620.00 $1,668.60 $1,718.66 $1,770.22 $1,823.33 Industrial 1-cubic yard (lined) $585.00 $1,111.00 $1,144.33 $1,178.66 $1,214.02 $1,250.44 Industrial 10-cubic yard (lined) n/a $8,179.00 $8,424.37 $8,677.10 $8,937.41 $9,205.53 Industrial 13.4-cubic yard (lined) $635.00 $8,802.00 $9,066.06 $9,338.04 $9,618.18 $9,906.73 Industrial 20-cubic yard (lined) n/a $11,850.00 $12,205.50 $12,571.67 $12,948.82 $13,337.28 Industrial 30-cubic yard (lined) $700.00 $10,221.00 $10,527.63 $10,843.46 $11,168.76 $11,503.82 Industrial 40-cubic yard (lined) $750.00 $11,706.00 $12,057.18 $12,418.90 $12,791.47 $13,175.21

1020
City of Oxnard / Environmental Resources Cost of Service and Rate Study Report 78 APPENDIX:
1021
City of Oxnard, California ‐ Rate Study for Environmental Resources Operating Cash Flow
Appendix A
Lkup FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Beginning Cash Reserves $19,102,113 $9,061,198 $6,039,312 $5,984,329 $5,638,784 $5,237,429 Rate Revenues
User Fee Revenues User Fee $41,219,962 $41,216,996 $41,216,996 $41,216,996 $41,216,996 $41,216,996 Placeholder $0 $0 $0 $0 $0 $0
Revenue Adjustment Rate Rev Adjust. $0 $0 $0 $0 $0 $0
Total Rate Revenue Under Existing / Adopted Rates $41,219,962 $41,216,996 $41,216,996 $41,216,996 $41,216,996 $41,216,996 Revenue Adjustments
Year Effect. Months % Adj.

FY 2023 12.0 0.0% $0 $0 $0 $0 $0 $0
FY 2024 12.0 0.0% $0 $0 $0 $0 $0 $0
FY 2025 12.0 33.0% $13,601,609 $13,601,609 $13,601,609 $13,601,609 $13,601,609 FY 2026 12.0 10.0% $5,481,861 $5,481,861 $5,481,861 $5,481,861 FY 2027 12.0 5.3% $3,165,774 $3,165,774 $3,165,774
FY 2028 12.0 3.0% $1,903,987 $1,903,987
FY 2029 12.0 1.4% $915,183
FY 2030 12.0 8.0%
FY 2031 12.0 3.0%
FY 2032 12.0 3.0%
Subtotal $0 $13,601,609 $19,083,469 $22,249,244 $24,153,231 $25,068,414 Total Revenues from Rates $41,219,962 $54,818,605 $60,300,466 $63,466,240 $65,370,227 $66,285,411 Other Revenues
Interest Rate 1.25% 1.25% 1.25% 1.25% 1.25% 1.25%
Other Miscellaneous Revenues Misc Fee $549,258 $562,271 $571,893 $581,754 $591,863 $602,224 MRF Recycle Material Sale RecyclingRev $2,778,510 $2,778,510 $2,778,510 $2,778,510 $2,778,510 $2,778,510 Investment Income $176,021 $94,378 $75,148 $72,644 $67,976 $75,402 Grants / Reimbursements $0 $0 $0 $0 $0 $0
IUF Reimbursements $2,614,128 $0 $0 $0 $0 $0
Late Payment / Penalties Allowance % $250,000 $249,982 $249,982 $249,982 $249,982 $249,982 Subtotal $6,367,917 $3,685,141 $3,675,533 $3,682,891 $3,688,332 $3,706,119 Total Revenues $47,587,879 $58,503,747 $63,975,999 $67,149,131 $69,058,559 $69,991,529 O&M Expenses
Non‐Department $0 $0 $0 $0 $0 $0
Offsetting Adjustment to Non‐Departmental Reclass of Capital Outlay $0 $0 $0 $0 $0 $0 ER Administration $8,203,064 $9,489,772 $10,755,685 $10,840,383 $10,927,347 $11,016,635 ER Outreach program $429,297 $442,839 $455,438 $458,954 $462,559 $466,255 ER Residential Collection $7,347,662 $7,607,700 $8,508,654 $8,614,839 $8,723,938 $8,836,036 ER Commercial Collection $7,852,639 $8,114,912 $8,359,596 $8,441,086 $8,524,807 $8,610,823 ER Industrial Collection $2,096,117 $2,170,416 $2,446,494 $2,473,596 $2,501,454 $2,530,088 ER Tip Floor Processing and Disposal $3,376,418 $3,487,261 $3,593,792 $3,626,069 $3,659,329 $3,693,600 ER Material Recovery Facility $6,789,305 $7,014,612 $7,217,056 $7,308,009 $7,401,425 $7,497,376 ER Waste Transfer Haul $16,142,972 $16,671,070 $16,247,737 $18,043,799 $18,470,986 $18,912,669 ER Cleanup and Illegal Dumping $260,357 $268,372 $276,334 $277,366 $278,427 $279,519 ER Security and Contamination Prevention $0 $0 $0 $0 $0 $0 Solid Waste Developer Impact Fee Residential $0 $0 $0 $0 $0 $0 Solid Waste Developer Impact Fee Commercial $0 $0 $0 $0 $0 $0 Placeholder $0 $0 $0 $0 $0 $0
Total O&M Expenses $52,497,831 $55,266,954 $57,860,786 $60,084,101 $60,950,272 $61,843,001 Capital
Projects ‐ Solid Waste Operating Fund 631 $2,944,815 $200,000 $0 $0 $0 $0 Projects ‐ Environmental Resources Sec & Contamination 638 $0 $0 $300,000 $0 $0 $0 Total Capital $2,944,815 $200,000 $300,000 $0 $0 $0
Debt
Existing Debt Service 631 $2,121,263 $2,121,263 $2,121,263 $2,121,264 $1,990,394 $0 Proposed Debt Service $0 $0 $795,396 $2,330,186 $3,558,018 $3,558,018 Proposed Capital Leases $64,885 $3,937,416 $2,953,537 $2,959,126 $2,961,230 $3,000,998 Proposed Interfund Loan $0 $0 $0 $0 $0 $0
Total Debt Service $2,186,148 $6,058,680 $5,870,195 $7,410,576 $8,509,642 $6,559,016 Transfers
Placeholder $0 $0 $0 $0 $0 $0
Placeholder $0 $0 $0 $0 $0 $0
Placeholder $0 $0 $0 $0 $0 $0
Subtotal Transfers $0 $0 $0 $0 $0 $0
Net Cash Flow ($10,040,915) ($3,021,887) ($54,983) ($345,545) ($401,354) $1,589,513 Interfund Loan Proceeds $0 $0 $0 $0 $0 $0
Ending Cash Reserves $9,061,198 $6,039,312 $5,984,329 $5,638,784 $5,237,429 $6,826,942 Operating Reserve Target Y 90 $12,944,671 $13,627,468 $14,267,043 $14,815,258 $15,028,834 $15,248,959 Net Above / (Below) Target ($3,883,473) ($7,588,156) ($8,282,714) ($9,176,474) ($9,791,405) ($8,422,017) 1022
City of Oxnard, California Budget Adjusted Projected Projected Projected Projected Projected Rate Study for Environmental Resources Input Adjustments FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Expense Forecast
Appendix B
Expense Summary by Cost Center
Cost Center HTE Account Escalation Budget Adjusted Projected Projected Projected Projected Projected Description Code Munis Org Munis Object Department Cost Category Factor Input Adjustments FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Code Code
Inflation Factors
Inflation ‐ General Gen ‐ Inf 5.00% 3.50% 2.50% 2.50% 2.50% 2.50% Salary/Benefits Labor 3.00% 3.00% 3.00% 0.00% 0.00% 0.00% Material and Supplies Supplies 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% Utility Utility 3.50% 3.50% 3.50% 3.50% 3.50% 3.50%
Professional Services ProfSvc 3.00% 3.50% 2.50% 2.50% 2.50% 2.50% Maintenance / Fuel Maint. / Fuel 6.00% 5.00% 4.00% 2.50% 2.50% 2.50% Fleet Fleet 3.30% 3.30% 3.30% 3.30% 3.30% 3.30%
Supplemental Fleet Hauling Expense Sup Fleet Haul 3.00% 3.50% ‐57.50% 2.50% 2.50% 2.50% Capital Capital 3.30% 3.30% 3.30% 3.30% 3.30% 3.30%
Non‐Inflated Constant 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Indirect Costs Indirect 5.00% 3.50% 2.50% 2.50% 2.50% 2.50% Cost Center HTE Account Escalation Budget Adjusted Projected Projected Projected Projected Projected Description Code Munis Org Munis Object Department Cost Category Factor Input Adjustments FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Code Code
Salaries and Wages
DIRECT LABOR‐REGULAR 631‐6301‐841.80‐01 6301 6313630 50000 ER Administration Personnel Expenses Labor $2,996,880 $0 $2,996,880 $3,086,786 $3,179,390 $3,179,390 $3,179,390 $3,179,390 DIRECT LABOR‐TEMPORARY 631‐6301‐841.80‐02 6301 6313630 50100 ER Administration Personnel Expenses Labor $56,461 $0 $56,461 $58,155 $59,900 $59,900 $59,900 $59,900 OVERTIME 631‐6301‐841.80‐03 6301 6313630 50200 ER Administration Personnel Expenses Labor $100,123 $0 $100,123 $103,127 $106,221 $106,221 $106,221 $106,221 SALARY CONTIN/WORKER COMP 631‐6301‐841.80‐05 6301 6313630 51300 ER Administration Personnel Expenses Labor $198,653 $0 $198,653 $204,613 $210,751 $210,751 $210,751 $210,751 PERSONAL SERVICES / AUTO ALLOWANCE 631‐6301‐841.80‐21 6301 6313630 51400 ER Administration Personnel Expenses Labor $1,050 $0 $1,050 $1,082 $1,114 $1,114 $1,114 $1,114 PARS 631‐6301‐841.80‐40 6301 6313630 51030 ER Administration Personnel Expenses Labor $95,965 $0 $95,965 $98,844 $101,809 $101,809 $101,809 $101,809 EMPLOYEE BENEFITS 631‐6301‐841.80‐41 6301 6313630 51160 ER Administration Personnel Expenses Labor $963,831 $0 $963,831 $992,746 $1,022,528 $1,022,528 $1,022,528 $1,022,528 PERS 631‐6301‐841.80‐43 6301 6313630 51000 ER Administration Personnel Expenses Labor $306,965 $0 $306,965 $316,174 $325,659 $325,659 $325,659 $325,659 PARS ‐ ERIP 631‐6301‐841.80‐47 6301 6313630 51040 ER Administration Personnel Expenses Labor $14,381 $0 $14,381 $14,812 $15,256 $15,256 $15,256 $15,256 DIRECT LABOR‐REGULAR 631‐6302‐841.80‐01 6302 6313631 50000 ER Outreach program Personnel Expenses Labor $181,746 $0 $181,746 $187,198 $192,814 $192,814 $192,814 $192,814 EMPLOYEE BENEFITS 631‐6302‐841.80‐41 6302 6313631 51160 ER Outreach program Personnel Expenses Labor $61,346 $0 $61,346 $63,186 $65,082 $65,082 $65,082 $65,082 WORKERS COMP INSURANCE 631‐6302‐841.80‐42 6302 6313631 51300 ER Outreach program Personnel Expenses Labor $11,817 $0 $11,817 $12,172 $12,537 $12,537 $12,537 $12,537 PERS 631‐6302‐841.80‐43 6302 6313631 51000 ER Outreach program Personnel Expenses Labor $18,920 $0 $18,920 $19,488 $20,073 $20,073 $20,073 $20,073 DIRECT LABOR‐REGULAR 631‐6307‐841.80‐01 6307 6313632 50000 ER Residential Collection Personnel Expenses Labor $1,997,756 $0 $1,997,756 $2,057,689 $2,119,420 $2,119,420 $2,119,420 $2,119,420 OVERTIME 631‐6307‐841.80‐03 6307 6313632 50200 ER Residential Collection Personnel Expenses Labor $289,341 $0 $289,341 $298,021 $306,962 $306,962 $306,962 $306,962 SALARY CONTIN/WORKER COM 631‐6307‐841.80‐05 6307 6313632 51300 ER Residential Collection Personnel Expenses Labor $137,562 $0 $137,562 $141,689 $145,940 $145,940 $145,940 $145,940 PARS 631‐6307‐841.80‐40 6307 6313632 51030 ER Residential Collection Personnel Expenses Labor $183,832 $0 $183,832 $189,347 $195,027 $195,027 $195,027 $195,027 EMPLOYEE BENEFITS 631‐6307‐841.80‐41 6307 6313632 51160 ER Residential Collection Personnel Expenses Labor $660,156 $0 $660,156 $679,961 $700,360 $700,360 $700,360 $700,360 PERS 631‐6307‐841.80‐43 6307 6313632 51000 ER Residential Collection Personnel Expenses Labor $212,598 $0 $212,598 $218,976 $225,545 $225,545 $225,545 $225,545 PARS ‐ ERIP 631‐6307‐841.80‐47 6307 6313632 51040 ER Residential Collection Personnel Expenses Labor $5,423 $0 $5,423 $5,586 $5,754 $5,754 $5,754 $5,754 DIRECT LABOR‐REGULAR 631‐6308‐841.80‐01 6308 6313633 50000 ER Commercial Collection Personnel Expenses Labor $2,523,165 $0 $2,523,165 $2,598,860 $2,676,826 $2,676,826 $2,676,826 $2,676,826 OVERTIME 631‐6308‐841.80‐03 6308 6313633 50200 ER Commercial Collection Personnel Expenses Labor $345,819 $0 $345,819 $356,194 $366,880 $366,880 $366,880 $366,880 SALARY CONTIN/WORKER COM 631‐6308‐841.80‐05 6308 6313633 51300 ER Commercial Collection Personnel Expenses Labor $180,883 $0 $180,883 $186,309 $191,898 $191,898 $191,898 $191,898 PARS 631‐6308‐841.80‐40 6308 6313633 51030 ER Commercial Collection Personnel Expenses Labor $165,887 $0 $165,887 $170,864 $175,990 $175,990 $175,990 $175,990 EMPLOYEE BENEFITS 631‐6308‐841.80‐41 6308 6313633 51160 ER Commercial Collection Personnel Expenses Labor $994,332 $0 $994,332 $1,024,162 $1,054,887 $1,054,887 $1,054,887 $1,054,887 PERS 631‐6308‐841.80‐43 6308 6313633 51000 ER Commercial Collection Personnel Expenses Labor $266,243 $0 $266,243 $274,230 $282,457 $282,457 $282,457 $282,457 PARS ‐ ERIP 631‐6308‐841.80‐47 6308 6313633 51040 ER Commercial Collection Personnel Expenses Labor $4,813 $0 $4,813 $4,957 $5,106 $5,106 $5,106 $5,106 PEMCA‐RETIREE 631‐6308‐841.80‐48 6308 6313633 51210 ER Commercial Collection Personnel Expenses Labor $52,141 $0 $52,141 $53,705 $55,316 $55,316 $55,316 $55,316 DIRECT LABOR‐REGULAR 631‐6309‐841.80‐01 6309 6313634 50000 ER Industrial Collection Personnel Expenses Labor $622,903 $0 $622,903 $641,590 $660,838 $660,838 $660,838 $660,838 OVERTIME 631‐6309‐841.80‐03 6309 6313634 50200 ER Industrial Collection Personnel Expenses Labor $95,000 $0 $95,000 $97,850 $100,786 $100,786 $100,786 $100,786 SALARY CONTIN/WORKER COM 631‐6309‐841.80‐05 6309 6313634 51300 ER Industrial Collection Personnel Expenses Labor $44,157 $0 $44,157 $45,482 $46,846 $46,846 $46,846 $46,846 PARS 631‐6309‐841.80‐40 6309 6313634 51030 ER Industrial Collection Personnel Expenses Labor $70,057 $0 $70,057 $72,159 $74,324 $74,324 $74,324 $74,324 EMPLOYEE BENEFITS 631‐6309‐841.80‐41 6309 6313634 51160 ER Industrial Collection Personnel Expenses Labor $221,790 $0 $221,790 $228,444 $235,297 $235,297 $235,297 $235,297 PERS 631‐6309‐841.80‐43 6309 6313634 51000 ER Industrial Collection Personnel Expenses Labor $64,844 $0 $64,844 $66,789 $68,793 $68,793 $68,793 $68,793 DIRECT LABOR‐REGULAR 631‐6312‐841.80‐01 6312 6313635 50000 ER Tip Floor Processing and Disposal Personnel Expenses Labor $1,146,861 $0 $1,146,861 $1,181,267 $1,216,705 $1,216,705 $1,216,705 $1,216,705 OVERTIME 631‐6312‐841.80‐03 6312 6313635 50200 ER Tip Floor Processing and Disposal Personnel Expenses Labor $300,000 $0 $300,000 $309,000 $318,270 $318,270 $318,270 $318,270 SALARY CONTIN/WORKER COMP 631‐6312‐841.80‐05 6312 6313635 51300 ER Tip Floor Processing and Disposal Personnel Expenses Labor $78,385 $0 $78,385 $80,737 $83,159 $83,159 $83,159 $83,159 EMPLOYEE BENEFITS 631‐6312‐841.80‐41 6312 6313635 51160 ER Tip Floor Processing and Disposal Personnel Expenses Labor $470,086 $0 $470,086 $484,189 $498,715 $498,715 $498,715 $498,715 PERS 631‐6312‐841.80‐43 6312 6313635 51000 ER Tip Floor Processing and Disposal Personnel Expenses Labor $121,315 $0 $121,315 $124,954 $128,703 $128,703 $128,703 $128,703 DIRECT LABOR‐REGULAR 631‐6313‐841.80‐01 6313 6313636 50000 ER Material Recovery Facility Personnel Expenses Labor $1,851,875 $0 $1,851,875 $1,907,431 $1,964,654 $1,964,654 $1,964,654 $1,964,654 OVERTIME 631‐6313‐841.80‐03 6313 6313636 50200 ER Material Recovery Facility Personnel Expenses Labor $300,000 $0 $300,000 $309,000 $318,270 $318,270 $318,270 $318,270 EMPLOYEE BENEFITS 631‐6313‐841.80‐41 6313 6313636 51160 ER Material Recovery Facility Personnel Expenses Labor $741,354 $0 $741,354 $763,595 $786,503 $786,503 $786,503 $786,503 WORKERS COMP INSURANCE 631‐6313‐841.80‐42 6313 6313636 51300 ER Material Recovery Facility Personnel Expenses Labor $125,858 $0 $125,858 $129,634 $133,523 $133,523 $133,523 $133,523 PERS 631‐6313‐841.80‐43 6313 6313636 51000 ER Material Recovery Facility Personnel Expenses Labor $194,706 $0 $194,706 $200,547 $206,563 $206,563 $206,563 $206,563 DIRECT LABOR‐REGULAR 631‐6314‐841.80‐01 6314 6313637 50000 ER Waste Transfer Haul Personnel Expenses Labor $1,142,253 $0 $1,142,253 $1,176,521 $1,211,817 $1,211,817 $1,211,817 $1,211,817 OVERTIME 631‐6314‐841.80‐03 6314 6313637 50200 ER Waste Transfer Haul Personnel Expenses Labor $200,000 $0 $200,000 $206,000 $212,180 $212,180 $212,180 $212,180 PARS 631‐6314‐841.80‐40 6314 6313637 51030 ER Waste Transfer Haul Personnel Expenses Labor $152,858 $0 $152,858 $157,444 $162,167 $162,167 $162,167 $162,167 EMPLOYEE BENEFITS 631‐6314‐841.80‐41 6314 6313637 51160 ER Waste Transfer Haul Personnel Expenses Labor $402,911 $0 $402,911 $414,998 $427,448 $427,448 $427,448 $427,448 WORKERS COMP INSURANCE 631‐6314‐841.80‐42 6314 6313637 51300 ER Waste Transfer Haul Personnel Expenses Labor $81,996 $0 $81,996 $84,456 $86,990 $86,990 $86,990 $86,990 PERS 631‐6314‐841.80‐43 6314 6313637 51000 ER Waste Transfer Haul Personnel Expenses Labor $120,835 $0 $120,835 $124,460 $128,194 $128,194 $128,194 $128,194 ACCRUED SALARY & BENEFITS 631‐6313‐841.80‐23 6313 #N/A #N/A ER Material Recovery Facility Personnel Expenses Labor $2,850 $0 $2,850 $2,936 $3,024 $3,024 $3,024 $3,024 PARS ‐ ERIP 631‐6301‐841.80‐50 6301 6313630 51040 ER Administration Personnel Expenses Labor $417,263 $0 $417,263 $429,781 $442,674 $442,674 $442,674 $442,674 WORKERS COMP/SAFETY 631‐6302‐841.80‐50 6302 #N/A #N/A ER Outreach program Personnel Expenses Labor $22,855 $0 $22,855 $23,541 $24,247 $24,247 $24,247 $24,247 PARS ‐ ERIP 631‐6307‐841.80‐50 6307 6313632 51040 ER Residential Collection Personnel Expenses Labor $310,172 $0 $310,172 $319,477 $329,061 $329,061 $329,061 $329,061 PEMCA‐RETIREE 631‐6308‐841.80‐50 6308 6313633 51210 ER Commercial Collection Personnel Expenses Labor $452,742 $0 $452,742 $466,324 $480,314 $480,314 $480,314 $480,314 PERSONNEL SERVICES / PARS ‐ ERIP 631‐6309‐841.80‐50 6309 #N/A #N/A ER Industrial Collection Personnel Expenses Labor $97,949 $0 $97,949 $100,887 $103,914 $103,914 $103,914 $103,914 WORKERS COMP/SAFETY 631‐6312‐841.80‐50 6312 #N/A #N/A ER Tip Floor Processing and Disposal Personnel Expenses Labor $217,664 $0 $217,664 $224,194 $230,920 $230,920 $230,920 $230,920 WORKERS COMP/SAFETY 631‐6313‐841.80‐50 6313 #N/A #N/A ER Material Recovery Facility Personnel Expenses Labor $337,380 $0 $337,380 $347,501 $357,926 $357,926 $357,926 $357,926 WORKERS COMP/SAFETY 631‐6314‐841.80‐50 6314 #N/A #N/A ER Waste Transfer Haul Personnel Expenses Labor $174,131 $0 $174,131 $179,355 $184,736 $184,736 $184,736 $184,736 DIRECT LABOR‐REGULAR 631‐6317‐841.80‐01 6317 6313638 50000 ER Cleanup and Illegal Dumping Personnel Expenses Labor $0 $114,271 $114,271 $117,699 $121,230 $121,230 $121,230 $121,230 DIRECT LABOR‐TEMPORARY 631‐6317‐841.80‐02 6317 6313638 50100 ER Cleanup and Illegal Dumping Personnel Expenses Labor $0 $0 $0 $0 $0 $0 $0 $0 PERSONNEL SERVICES / OVERTIME 631‐6317‐841.80‐03 6317 6313638 50200 ER Cleanup and Illegal Dumping Personnel Expenses Labor $0 $10,000 $10,000 $10,300 $10,609 $10,609 $10,609 $10,609 PARS 631‐6317‐841.80‐40 6317 6313638 51030 ER Cleanup and Illegal Dumping Personnel Expenses Labor $0 $6,773 $6,773 $6,976 $7,185 $7,185 $7,185 $7,185 EMPLOYEE BENEFITS 631‐6317‐841.80‐41 6317 6313638 51160 ER Cleanup and Illegal Dumping Personnel Expenses Labor $0 $50,242 $50,242 $51,749 $53,301 $53,301 $53,301 $53,301 WORKERS COMP INSURANCE 631‐6317‐841.80‐42 6317 6313638 51300 ER Cleanup and Illegal Dumping Personnel Expenses Labor $38,665 ($30,932) $7,733 $7,965 $8,204 $8,204 $8,204 $8,204 PERS 631‐6317‐841.80‐43 6317 6313638 51000 ER Cleanup and Illegal Dumping Personnel Expenses Labor $0 $12,281 $12,281 $12,649 $13,028 $13,028 $13,028 $13,028 MISC‐PERS UAL 631‐6317‐841.80‐50 6317 6313638 51010 ER Cleanup and Illegal Dumping Personnel Expenses Labor $0 $23,943 $23,943 $24,661 $25,401 $25,401 $25,401 $25,401 SALARY CONTIN/WORKER COM 631‐6308‐841.80‐23 6308 6313633 51300 ER Commercial Collection Personnel Expenses Labor $4,750 $0 $4,750 $4,893 $5,040 $5,040 $5,040 $5,040 SALARY CONTIN/WORKER COM 631‐6307‐841.80‐23 6307 6313632 51300 ER Residential Collection Personnel Expenses Labor $3,800 $0 $3,800 $3,914 $4,031 $4,031 $4,031 $4,031 SALARY CONTIN/WORKER COM 631‐6309‐841.80‐23 6309 6313634 51300 ER Industrial Collection Personnel Expenses Labor $950 $0 $950 $979 $1,008 $1,008 $1,008 $1,008 ACCRUED SALARY & BENEFITS 631‐6314‐841.80‐23 6314 #N/A #N/A ER Waste Transfer Haul Personnel Expenses Labor $1,900 $0 $1,900 $1,957 $2,016 $2,016 $2,016 $2,016 TRANSFER TO GENERAL FUND 631‐6301‐808.87‐01 6301 6313630 59800 ER Administration Indirect Cost Allocation Indirect $77,948 $0 $77,948 $80,676 $82,693 $84,760 $86,879 $89,051 Subtotal $23,739,152 $186,578 $23,925,730 $24,643,894 $25,382,809 $25,384,876 $25,386,995 $25,389,167 Contractual Services 5 trucks $263,925
SERVICES‐OTHER PROF/CONT 631‐6301‐842.82‐09 6301 6313630 53200 ER Administration Professional Services ProfSvc $1,877,312 ($500,000) $1,377,312 $1,425,518 $1,461,156 $1,497,685 $1,535,127 $1,573,505 SERVICES‐LEGAL ADVERTIS'G 631‐6301‐842.82‐21 6301 6313630 53250 ER Administration Professional Services ProfSvc $40,500 $0 $40,500 $41,918 $42,966 $44,040 $45,141 $46,270 SUPP. WASTE HAULING 631‐6314‐842.82‐81 6314 6313637 54400 ER Waste Transfer Haul Other Contracted Services Sup Fleet Haul $1,500,000 $0 $1,500,000 $1,552,500 $659,813 $676,308 $693,216 $710,546 CONTRACTUAL SERVICES / PERSONNEL 631‐6301‐842.82‐31 6301 #N/A #N/A ER Administration Other Contracted Services ProfSvc $200,000 ($100,000) $100,000 $103,500 $106,088 $108,740 $111,459 $114,245 GREENWASTE PROCESSING 631‐6313‐842.82‐80 6313 6313636 54300 ER Material Recovery Facility Professional Services ProfSvc $1,000,000 $0 $1,000,000 $1,035,000 $1,060,875 $1,087,397 $1,114,582 $1,142,447 MINOR OFFICE EQUIPMENT 631‐6301‐842.81‐32 6301 #N/A #N/A ER Administration Professional Services ProfSvc $10,000 $0 $10,000 $10,350 $10,609 $10,874 $11,146 $11,425 Subtotal $4,627,812 ($600,000) $4,027,812 $4,168,786 $3,341,507 $3,425,044 $3,510,671 $3,598,438 Supplies
SAFETY SUPPLIES 631‐6301‐843.81‐05 6301 6313630 52610 ER Administration Supplies Supplies $75,000 $0 $75,000 $78,000 $81,120 $84,365 $87,740 $91,250 UNIFORMS 631‐6301‐843.81‐13 6301 6313630 52300 ER Administration Supplies Supplies $150,000 $0 $150,000 $156,000 $162,240 $168,730 $175,479 $182,498 SHOP AND FIELD 631‐6307‐843.81‐04 6307 6313632 52400 ER Residential Collection Supplies Supplies $400,000 $0 $400,000 $416,000 $432,640 $449,946 $467,944 $486,662 MINOR EQUIP‐SHOP/FIELD 631‐6308‐843.81‐34 6308 6313633 52400 ER Commercial Collection Supplies Supplies $300,000 $0 $300,000 $312,000 $324,480 $337,459 $350,957 $364,995 MINOR EQUIP‐SHOP/FIELD 631‐6309‐843.81‐34 6309 6313634 52400 ER Industrial Collection Supplies Supplies $120,000 $0 $120,000 $124,800 $129,792 $134,984 $140,383 $145,998 REPAIR PARTS 631‐6312‐843.81‐21 6312 6313635 52110 ER Tip Floor Processing and Disposal Supplies Supplies $80,000 $0 $80,000 $83,200 $86,528 $89,989 $93,589 $97,333 MINOR EQUIP‐SHOP/FIELD 631‐6312‐843.81‐34 6312 6313635 52400 ER Tip Floor Processing and Disposal Supplies Supplies $187,800 $0 $187,800 $195,312 $203,124 $211,249 $219,699 $228,487 FUEL‐DIESEL 631‐6312‐843.81‐38 6312 6313635 54090 ER Tip Floor Processing and Disposal Maintenance / Fuel Maint. / Fuel $200,000 $0 $200,000 $210,000 $218,400 $223,860 $229,457 $235,193 SHOP AND FIELD 631‐6313‐843.81‐04 6313 6313636 52400 ER Material Recovery Facility Supplies Supplies $185,000 $0 $185,000 $192,400 $200,096 $208,100 $216,424 $225,081 REPAIR PARTS 631‐6313‐843.81‐21 6313 6313636 52110 ER Material Recovery Facility Supplies Supplies $110,000 $0 $110,000 $114,400 $118,976 $123,735 $128,684 $133,831 FUEL‐DIESEL 631‐6313‐843.81‐38 6313 6313636 54090 ER Material Recovery Facility Maintenance / Fuel Maint. / Fuel $45,000 $0 $45,000 $47,250 $49,140 $50,369 $51,628 $52,919 CASH BUY BACK RECYCLES 631‐6313‐843.81‐45 6313 6313636 54200 ER Material Recovery Facility Disposal Gen ‐ Inf $2,700,000 ($1,900,000) $800,000 $828,000 $848,700 $869,918 $891,666 $913,958 Subtotal $4,552,800 ($1,900,000) $2,652,800 $2,757,362 $2,855,236 $2,952,704 $3,053,650 $3,158,205 Utilities
TEL CHRG/MANAGED SERVICES 631‐6301‐844.84‐22 6301 6313630 54080 ER Administration Utilities Gen ‐ Inf $50,000 $0 $50,000 $51,750 $53,044 $54,370 $55,729 $57,122 TELEPHONE CHGS/HIPC 631‐6301‐844.85‐30 6301 6313630 59400 ER Administration Utilities Gen ‐ Inf $38,318 $0 $38,318 $39,659 $40,650 $41,666 $42,708 $43,776 REFUSE AND DISPOSAL 631‐6314‐844.82‐68 6314 6313637 54050 ER Waste Transfer Haul Disposal Calculated $10,700,000 ($437,280) $10,262,720 $10,571,183 $10,888,654 $11,215,283 $11,551,070 $11,899,067 ELECTRICITY 631‐6301‐844.82‐61 6301 6313630 54010 ER Administration Utilities Gen ‐ Inf $110,151 $0 $110,151 $114,006 $116,856 $119,777 $122,771 $125,840 NATURAL GAS 631‐6301‐844.82‐62 6301 6313630 54020 ER Administration Utilities Gen ‐ Inf $2,600 $0 $2,600 $2,691 $2,758 $2,827 $2,898 $2,970 UTILITIES EXPENSE / WASTEWATER 631‐6301‐844.82‐66 6301 6313630 54030 ER Administration Utilities Gen ‐ Inf $1,800 $0 $1,800 $1,863 $1,910 $1,958 $2,007 $2,057 WATER 631‐6301‐844.82‐67 6301 6313630 54040 ER Administration Utilities Gen ‐ Inf $18,000 $0 $18,000 $18,630 $19,096 $19,573 $20,062 $20,564 Subtotal $10,920,869 ($437,280) $10,483,589 $10,799,782 $11,122,968 $11,455,454 $11,797,245 $12,151,396 Administration
POSTAGE 631‐6301‐846.81‐01 6301 6313630 52000 ER Administration Supplies Gen ‐ Inf $3,000 $0 $3,000 $3,105 $3,183 $3,263 $3,345 $3,429 OFFICE SUPPLIES 631‐6301‐846.81‐02 6301 6313630 52900 ER Administration Supplies Gen ‐ Inf $35,000 $0 $35,000 $36,225 $37,131 $38,059 $39,010 $39,985 SUBSCRIPTION & PUBLICAT' 631‐6301‐846.81‐11 6301 6313630 52200 ER Administration Supplies Gen ‐ Inf $495 $0 $495 $512 $525 $538 $551 $565 TRAINING/WORKSHOP/MEETIN 631‐6301‐846.83‐43 6301 6313630 52310 ER Administration Professional Services Gen ‐ Inf $30,000 $0 $30,000 $31,050 $31,826 $32,622 $33,438 $34,274 EDUCATION REIMBURSEMENTS 631‐6301‐846.83‐46 6301 6313630 52330 ER Administration Professional Services Gen ‐ Inf $6,500 $0 $6,500 $6,728 $6,896 $7,068 $7,245 $7,426 MEMBERSHIPS‐OTHER 631‐6301‐846.83‐57 6301 6313630 52340 ER Administration Professional Services Gen ‐ Inf $10,000 $0 $10,000 $10,350 $10,609 $10,874 $11,146 $11,425 BAD DEBT EXPENSE 631‐6301‐846.83‐78 6301 6313630 57200 ER Administration Indirect Cost Allocation Gen ‐ Inf $30,000 $0 $30,000 $31,050 $31,826 $32,622 $33,438 $34,274 PHOTOCOPY CHARGES 631‐6301‐846.84‐02 6301 6313630 53020 ER Administration Professional Services Gen ‐ Inf $6,691 $0 $6,691 $6,925 $7,098 $7,275 $7,457 $7,643 BANK CHARGES 631‐6301‐846.84‐03 6301 6313630 53500 ER Administration Professional Services Gen ‐ Inf $37,180 $0 $37,180 $38,481 $39,443 $40,429 $41,440 $42,476 LEGAL ADVOCACY 631‐6301‐846.84‐62 6301 6313630 53260 ER Administration Professional Services Gen ‐ Inf $15,000 $0 $15,000 $15,525 $15,913 $16,311 $16,719 $17,137 DATA PROCESSING‐OPERATIO 631‐6301‐846.85‐22 6301 6313630 59200 ER Administration Other Contracted Services Gen ‐ Inf $345,024 ($50,000) $295,024 $305,350 $312,984 $320,809 $328,829 $337,050 LIABILITY INSURANCE 631‐6301‐846.85‐25 6301 6313630 59300 ER Administration Insurance Gen ‐ Inf $185,695 $0 $185,695 $192,194 $196,999 $201,924 $206,972 $212,146 INDIRECT PRORATED CST CH 631‐6301‐846.85‐32 6301 6313630 59600 ER Administration Indirect Cost Allocation Gen ‐ Inf $263,069 $0 $263,069 $272,276 $279,083 $286,060 $293,212 $300,542 INTER‐FUND PRORATED CHGS 631‐6301‐846.85‐33 6301 6313630 59500 ER Administration Indirect Cost Allocation Gen ‐ Inf $12,209 $0 $12,209 $12,636 $12,952 $13,276 $13,608 $13,948 SERVICES‐ADV & PROMOTION 631‐6302‐846.82‐26 6302 6313631 53250 ER Outreach program Supplies Gen ‐ Inf $45,000 $0 $45,000 $46,575 $47,739 $48,932 $50,155 $51,409 POUTREACH / EDUCATION 631‐6302‐846.84‐70 6302 6313631 52510 ER Outreach program Professional Services Gen ‐ Inf $7,000 $0 $7,000 $7,245 $7,426 $7,612 $7,802 $7,997 DATA PROCESSING‐OPERATIO 631‐6302‐846.85‐22 6302 6313631 59200 ER Outreach program Other Contracted Services Gen ‐ Inf $18,898 $0 $18,898 $19,559 $20,048 $20,549 $21,063 $21,590 LIABILITY INSURANCE 631‐6302‐846.85‐25 6302 6313631 59300 ER Outreach program Insurance Gen ‐ Inf $10,874 $0 $10,874 $11,255 $11,536 $11,824 $12,120 $12,423 INDIRECT PRORATED CST CH 631‐6302‐846.85‐32 6302 6313631 59600 ER Outreach program Indirect Cost Allocation Gen ‐ Inf $50,841 $0 $50,841 $52,620 $53,936 $55,284 $56,666 $58,083 RENTAL‐VEHIC & EQUIPMENT 631‐6307‐846.83‐21 6307 6313632 57000 ER Residential Collection Fleet Gen ‐ Inf $776,541 $0 $776,541 $803,720 $823,813 $844,408 $865,518 $887,156 CUSTOMER BILLING CHARGES 631‐6307‐846.85‐21 6307 6313632 59100 ER Residential Collection Disposal Gen ‐ Inf $383,285 $0 $383,285 $396,700 $406,618 $416,783 $427,203 $437,883 DATA PROCESSING‐OPERATIO 631‐6307‐846.85‐22 6307 6313632 59200 ER Residential Collection Other Contracted Services Gen ‐ Inf $256,473 $0 $256,473 $265,450 $272,086 $278,888 $285,860 $293,007 LIABILITY INSURANCE 631‐6307‐846.85‐25 6307 6313632 59300 ER Residential Collection Insurance Gen ‐ Inf $126,586 $0 $126,586 $131,017 $134,292 $137,649 $141,090 $144,617 INDIRECT PRORATED CST CH 631‐6307‐846.85‐32 6307 6313632 59600 ER Residential Collection Indirect Cost Allocation Gen ‐ Inf $198,916 $0 $198,916 $205,878 $211,025 $216,301 $221,709 $227,252 RENTAL‐VEHIC & EQUIPMENT 631‐6308‐846.83‐21 6308 6313633 57000 ER Commercial Collection Fleet Gen ‐ Inf $517,694 $0 $517,694 $535,813 $549,208 $562,938 $577,011 $591,436 SERVICE FROM OTHER PROGA 631‐6308‐846.84‐51 6308 6313633 59000 ER Commercial Collection Indirect Cost Allocation Gen ‐ Inf $50,000 $0 $50,000 $51,750 $53,044 $54,370 $55,729 $57,122 CUSTOMER BILLING CHARGES 631‐6308‐846.85‐21 6308 6313633 59100 ER Commercial Collection Disposal Gen ‐ Inf $410,663 $0 $410,663 $425,036 $435,662 $446,554 $457,718 $469,161 1023
Cost Center HTE Account Escalation Budget Adjusted Projected Projected Projected Projected Projected Description Code Munis Org Munis Object Department Cost Category Factor Input Adjustments FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Code Code
DATA PROCESSING‐OPERATIO 631‐6308‐846.85‐22 6308 6313633 59200 ER Commercial Collection Other Contracted Services Gen ‐ Inf $383,360 $0 $383,360 $396,778 $406,697 $416,864 $427,286 $437,968 LIABILITY INSURANCE 631‐6308‐846.85‐25 6308 6313633 59300 ER Commercial Collection Insurance Gen ‐ Inf $166,449 $0 $166,449 $172,275 $176,582 $180,997 $185,522 $190,160 INDIRECT PRORATED CST CH 631‐6308‐846.85‐32 6308 6313633 59600 ER Commercial Collection Indirect Cost Allocation Gen ‐ Inf $308,068 $0 $308,068 $318,850 $326,821 $334,992 $343,367 $351,951 CUSTOMER BILLING CHARGES 631‐6309‐846.85‐21 6309 6313634 59100 ER Industrial Collection Disposal Gen ‐ Inf $118,636 $0 $118,636 $122,788 $125,858 $129,004 $132,229 $135,535 DATA PROCESSING‐OPERATIO 631‐6309‐846.85‐22 6309 6313634 59200 ER Industrial Collection Other Contracted Services Gen ‐ Inf $80,992 $0 $80,992 $83,827 $85,923 $88,071 $90,273 $92,530 LIABILITY INSURANCE 631‐6309‐846.85‐25 6309 6313634 59300 ER Industrial Collection Insurance Gen ‐ Inf $40,635 $0 $40,635 $42,057 $43,108 $44,186 $45,291 $46,423 INDIRECT PRORATED CST CH 631‐6309‐846.85‐32 6309 6313634 59600 ER Industrial Collection Indirect Cost Allocation Gen ‐ Inf $90,047 $0 $90,047 $93,199 $95,529 $97,917 $100,365 $102,874 SOFTWARE APPLICATIONS 631‐6312‐846.81‐18 6312 6313635 53000 ER Tip Floor Processing and Disposal Supplies Gen ‐ Inf $5,000 $0 $5,000 $5,175 $5,304 $5,437 $5,573 $5,712 TAXES AND FILING FEES 631‐6312‐846.83‐71 6312 6313635 57110 ER Tip Floor Processing and Disposal Professional Services Gen ‐ Inf $75,000 $0 $75,000 $77,625 $79,566 $81,555 $83,594 $85,684 DATA PROCESSING‐OPERATIO 631‐6312‐846.85‐22 6312 6313635 59200 ER Tip Floor Processing and Disposal Other Contracted Services Gen ‐ Inf $179,981 $0 $179,981 $186,280 $190,937 $195,710 $200,603 $205,618 LIABILITY INSURANCE 631‐6312‐846.85‐25 6312 6313635 59300 ER Tip Floor Processing and Disposal Insurance Gen ‐ Inf $72,134 $0 $72,134 $74,659 $76,525 $78,438 $80,399 $82,409 INDIRECT PRORATED CST CH 631‐6312‐846.85‐32 6312 6313635 59600 ER Tip Floor Processing and Disposal Indirect Cost Allocation Gen ‐ Inf $242,192 $0 $242,192 $250,669 $256,936 $263,359 $269,943 $276,692 RENTAL‐VEHIC & EQUIPMENT 631‐6313‐846.83‐21 6313 6313636 57000 ER Material Recovery Facility Fleet Gen ‐ Inf $50,000 $0 $50,000 $51,750 $53,044 $54,370 $55,729 $57,122 DATA PROCESSING‐OPERATIO 631‐6313‐846.85‐22 6313 6313636 59200 ER Material Recovery Facility Other Contracted Services Gen ‐ Inf $278,971 $0 $278,971 $288,735 $295,953 $303,352 $310,936 $318,709 LIABILITY INSURANCE 631‐6313‐846.85‐25 6313 6313636 59300 ER Material Recovery Facility Insurance Gen ‐ Inf $115,817 $0 $115,817 $119,871 $122,868 $125,940 $129,089 $132,316 INDIRECT PRORATED CST CH 631‐6313‐846.85‐32 6313 6313636 59600 ER Material Recovery Facility Indirect Cost Allocation Gen ‐ Inf $430,503 $0 $430,503 $445,571 $456,710 $468,128 $479,831 $491,827 DATA PROCESSING‐OPERATION 631‐6314‐846.85‐22 6314 6313637 59200 ER Waste Transfer Haul Other Contracted Services Gen ‐ Inf $143,985 $0 $143,985 $149,024 $152,750 $156,569 $160,483 $164,495 LIABILITY INSURANCE 631‐6314‐846.85‐25 6314 6313637 59300 ER Waste Transfer Haul Insurance Gen ‐ Inf $75,455 $0 $75,455 $78,096 $80,048 $82,049 $84,100 $86,203 INDIRECT PRORATED CST CHG 631‐6314‐846.85‐32 6314 6313637 59600 ER Waste Transfer Haul Indirect Cost Allocation Gen ‐ Inf $203,243 $0 $203,243 $210,357 $215,616 $221,006 $226,531 $232,194 CLAIMS & JUDGEMENTS 631‐6301‐846.83‐21 6301 6313630 58400 ER Administration Indirect Cost Allocation Gen ‐ Inf $70,000 $0 $70,000 $72,450 $74,261 $76,118 $78,021 $79,972 IT & DATA PROCESSING CHGS 631‐6317‐846.85‐22 6317 6313638 59200 ER Cleanup and Illegal Dumping Other Contracted Services Gen ‐ Inf $89,991 ($71,993) $17,998 $18,628 $19,094 $19,571 $20,060 $20,562 Subtotal $7,053,093 ($121,993) $6,931,100 $7,173,689 $7,353,031 $7,536,855 $7,725,279 $7,918,412 Repairs and Maintenance
FACILITY CHG‐MAINTENANCE 631‐6301‐847.85‐35 6301 6313630 59700 ER Administration Maintenance / Fuel Gen ‐ Inf $55,462 ($55,462) $0 $0 $0 $0 $0 $0 BUILDINGS AND IMPROVEMENT 631‐6313‐847.83‐01 6313 6313636 55010 ER Material Recovery Facility Maintenance / Fuel Maint. / Fuel $150,000 $0 $150,000 $157,500 $163,800 $167,895 $172,092 $176,394 FACILITY CHG‐MAINTENANCE 631‐6313‐847.85‐35 6313 6313636 59700 ER Material Recovery Facility Maintenance / Fuel Maint. / Fuel $69,991 $0 $69,991 $73,491 $76,431 $78,342 $80,301 $82,309 Subtotal $275,453 ($55,462) $219,991 $230,991 $240,231 $246,237 $252,393 $258,703 Capital Outlay
MACHINERY & EQUIP‐NEW 631‐6309‐891.86‐06 6309 6313634 56040 ER Industrial Collection Capital Outlay Capital $65,000 ($65,000) $0 $0 $0 $0 $0 $0 MACHINERY & EQUIP‐NEW 631‐6313‐891.86‐06 6313 6313636 56040 ER Material Recovery Facility Capital Outlay Capital $450,000 ($450,000) $0 $0 $0 $0 $0 $0 Subtotal $515,000 ($515,000) $0 $0 $0 $0 $0 $0
Other ‐ New Munis Codes
PRINCIPAL PAYMENTS n/a 6313630‐57500 6313630 57500 ER Administration Debt Service Constant $1,928,565 ($1,928,565) $0 $0 $0 $0 $0 $0 INTEREST PAYMENT n/a 6313630‐57510 6313630 57510 ER Administration Debt Service Constant $174,885 ($174,885) $0 $0 $0 $0 $0 $0 FLEET EQUIP MAINT ISF CHG n/a 6313632‐59500 6313632 59500 ER Residential Collection Maintenance / Fuel Maint. / Fuel $1,324,721 $0 $1,324,721 $1,390,957 $1,446,595 $1,482,760 $1,519,829 $1,557,825 FLEET EQUIP MAINT ISF CHG n/a 6313633‐59500 6313633 59500 ER Commercial Collection Maintenance / Fuel Maint. / Fuel $725,630 $0 $725,630 $761,912 $792,388 $812,198 $832,503 $853,316 FLEET EQUIP MAINT ISF CHG n/a 6313634‐59500 6313634 59500 ER Industrial Collection Maintenance / Fuel Maint. / Fuel $428,157 $0 $428,157 $449,565 $467,548 $479,237 $491,218 $503,498 FLEET EQUIP MAINT ISF CHG n/a 6313637‐59500 6313637 59500 ER Waste Transfer Haul Maintenance / Fuel Maint. / Fuel $1,680,685 $0 $1,680,685 $1,764,719 $1,835,308 $1,881,191 $1,928,221 $1,976,427 SUPPLIES SAFETY n/a 6313638‐52610 6313638 52610 ER Cleanup and Illegal Dumping Supplies Supplies $4,000 $0 $4,000 $4,160 $4,326 $4,499 $4,679 $4,866 MISC SUPPLIES n/a 6313638‐52900 6313638 52900 ER Cleanup and Illegal Dumping Supplies Supplies $2,000 $0 $2,000 $2,080 $2,163 $2,250 $2,340 $2,434 ADVERTISING n/a 6313638‐53250 6313638 53250 ER Cleanup and Illegal Dumping Professional Services ProfSvc $4,000 $0 $4,000 $4,140 $4,244 $4,350 $4,459 $4,570 IUF ‐ Franchise Fee back to General Fund n/a 6313630 ER Administration Indirect Cost Allocation Constant $2,048,468 $0 $0 $1,024,234 $2,048,468 $2,048,468 $2,048,468 $2,048,468 LIABILITY INSURANCE CHGS N/A 6313638 59300 ER Cleanup and Illegal Dumping Insurance Gen ‐ Inf $0 $7,116 $7,116 $7,365 $7,549 $7,738 $7,931 $8,129 PROJECT ASSIST n/a 6313632 52350 ER Residential Collection Indirect Cost Allocation Gen ‐ Inf $0 $80,500 $80,500 $83,318 $85,401 $87,536 $89,724 $91,967 $8,321,111 ($2,015,834) $4,256,809 $5,492,450 $6,693,990 $6,810,227 $6,929,372 $7,051,500 Incremental Expenses
ER Residential Collection
Routes 6313632                      8.25                      8.25                      9.25                      9.25                      9.25                      9.25 Personnel 6313632 ER Residential Collection Personnel Expenses $0 $0 $488,739 $488,739 $488,739 $488,739 Maintenance 6313632 ER Residential Collection Maintenance / Fuel $0 $0 $175,345 $179,728 $184,222 $188,827 ER Commercial Collection
Routes 6313633                    11.17                    11.17                    11.17                    11.17                    11.17                    11.17 Personnel 6313633 ER Commercial Collection Personnel Expenses $0 $0 $0 $0 $0 $0 Maintenance 6313633 ER Commercial Collection Maintenance / Fuel $0 $0 $0 $0 $0 $0 ER Industrial Collection
Routes 6313634                      8.00                      8.00                      9.00                      9.00                      9.00                      9.00 Personnel 6313634 ER Industrial Collection Personnel Expenses $0 $0 $148,487 $148,487 $148,487 $148,487 Maintenance 6313634 ER Industrial Collection Maintenance / Fuel $0 $0 $58,444 $59,905 $61,402 $62,937 ER Transfer Trucks
Routes 6313637                      8.83                      8.83                      8.83                    11.83                    11.83                    11.83 Personnel 6313637 ER Waste Transfer Haul Personnel Expenses $0 $0 $0 $756,950 $756,950 $756,950 Maintenance 6313637 ER Waste Transfer Haul Maintenance / Fuel $0 $0 $0 $638,895 $654,868 $671,239 Subtotal Incremental Expenses $0 $0 $0 $0 $871,014 $2,272,704 $2,294,667 $2,317,179 Total Operating Expenses $60,005,290 ($5,458,991) $52,497,831 $55,266,954 $57,860,786 $60,084,101 $60,950,272 $61,843,001 1024
City of Oxnard, California
Rate Study for Environmental Resources
COS Allocation Factor Determination
Appendix C
Collection
Description Allocation Factor FY 2029
Residential Cans ‐
Trash (96 Gal)
Residential Cans ‐
Recycling (96 Gal)
Residential Cans ‐
Green Waste (96
Gal)
Commercial Cans
Trash (96 gal)
Commercial
Container Trash
(2/4 CY)
Commercial
Container
Organic (64 gal)
Commercial
Container
Recycling & GW
Recycling
(Includes New
Indy) Green Waste Organics Transfer Trailers
Gallons per CY
Allocation Factors
Residential EBU Allocator Res EBUs 100.0% 34.1% 33.0% 33.0% Units 533,188,697                  181,561,267         175,813,715         175,813,715 Commercial EBU Allocator Com EBUs 100.0% 0.6% 80.0% 0.5% 18.8% Units 319,017,191                       2,068,768         255,203,844              1,697,141           60,047,438 Recycling EBUs Rcyc EBUs 100.0% 73.4% 25.0%
Units 239,607,853                  175,813,715           59,812,529 EBU Allocator EBUs 100.0% 19.7% 19.1% 19.1% 0.2% 27.8% 0.2% 6.5% Units 919,434,873                  181,561,267         175,813,715         175,813,715              2,068,768         255,203,844              1,697,141           60,047,438 Customer Accounts/Bins Accounts 100.0% 28.8% 28.8% 28.8% 0.8% 9.0% 0.5% 2.9% Units 37,561                                      10,827                   10,827                   10,827                         311                     3,368                         170                     1,091 Container Allocator Container 100.0% 31.9% 31.9% 31.9% 0.4% 2.9% 0.1% 0.9% 118,128 37,669 37,669 37,669 414 3,368 170 1,027
Available Recycling + Available MSW
Diversion Tons Avail Rcyc Tons 100.0% 37.6% 0.0% 0.4% 52.8% 0.0% Units 82,102                                      30,871                         288                   43,355 Green Waste Tons GW Tons 55.9% 55.8% 0.0% 0.0% 0.0% 0.1% Units 18,663                                       ‐ 10,409                           ‐                           ‐                                                     16 Collection Cost Indirect Tonnage Alloc Collect Indirect Tons 100.0% 24.6% 7.3% 6.0% 0.3% 39.2% 0.1% 3.9% Units 203,305                                    49,979                   14,907                   12,132                         646                   79,699                         109                     7,902 Collection Route Vehicle Costs Fleet Capital/Debt 100.0% 17.9% 17.9% 13.9% 2.0% 17.9% 4.0% 4.0% 0.5% 0.7% 0.1% Typical Truck Cost (Today's $) $355,000 $355,000 $355,000 $355,000 $355,000 $355,000 $355,000 $9,977 $13,413 $2,413 $220,000 Service Life 8.00 8.00 8.00 8.00 8.00 8.00 8.00 0.45 0.61 0.11 10.00 Average Annual Cost $44,375 $44,375 $44,375 $44,375 $44,375 $44,375 $44,375 $998 $1,341 $241 $22,000 Annual Fleet Cost $2,235,125 $399,375 $399,375 $310,625 $44,375 $399,375 $88,750 $88,750 $11,972 $16,096 $2,896 $264,000 SIMI Disposal Cost Tons SIMI Tons 100.0% 0.0% 0.0% 3.9% SIMI Tons 298,296                                      3,358               298,296 SIMI Tip Fee Rate 113 144
Materials hauled 9,631,659                                         ‐ ‐                                           379,454            9,631,659 Tip Floor Tons Tip Floor Tons 100.0% 8.5% 6.3% 1.1%
Total Tons 317,101                                    24,872                   18,663                     3,358               317,101 Less New Indy (23,133) 0 (23,133)
Materials hauled 293,968                                    24,872                   18,663                     3,358               293,968 Total Tons Tons 100.0% 7.8% 5.9% 1.1%
Total Tons 317,101                                    24,872                   18,663                     3,358               317,101 Transfer Trailer Tonnage Allocator Transfer Tons 100.0% 4.5% 6.1% 1.1% Total Tons 317,101                                    24,872                   18,663                     3,358               317,101 Less Recycling Material Sold (10,990) (10,990) (10,990) Materials hauled 306,111                                    13,882                   18,663                     3,358               306,111 1025
City of Oxnard, California
Rate Study for Environmental Resources
Rate Design Examples
Appendix D
2025 2026 2027 2028 2029
Residential Cart Service
96 Gallon Service Refuse Cart
Unit Cost per Gallon per Tip $0.058 $0.064 $0.068 $0.070 $0.070 Average Monthly Tips (52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 96.0 96.0 96.0 96.0 96.0
Calculated Rate $24.33 $26.76 $28.16 $29.01 $29.29
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Monthly Rate $24.45 $26.88 $28.28 $29.13 $29.41
64 Gallon Service Refuse Cart
Unit Cost per Gallon per Tip $0.059 $0.064 $0.068 $0.070 $0.070 Average Monthly Tips (52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 64.0 64.0 64.0 64.0 64.0
Calculated Rate $16.25 $17.88 $18.81 $19.38 $19.53
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Monthly Rate $16.37 $18.00 $18.93 $19.50 $19.65
96 Gallon Recycling Cart
Unit Cost per Gallon per Tip $0.026 $0.029 $0.030 $0.031 $0.032 Average Monthly Tips (52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 96.0 96.0 96.0 96.0 96.0
Calculated Rate $10.94 $12.03 $12.67 $13.05 $13.11
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Monthly Rate $11.06 $12.15 $12.79 $13.17 $13.23
96 Gallon Green Waste Cart
Unit Cost per Gallon per Tip $0.028 $0.031 $0.033 $0.034 $0.034 Average Monthly Tips (52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 96.0 96.0 96.0 96.0 96.0
Calculated Rate $11.78 $12.96 $13.64 $14.05 $14.12
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Monthly Rate $11.90 $13.08 $13.76 $14.17 $14.24
96 Gallon Refuse 3 Cart Service $47.41 $52.11 $54.83 $56.46 $56.89 64 Gallon Refuse 3 Cart Service $39.33 $43.23 $45.48 $46.83 $47.12 Additional 96 Gallon Cart $24.45 $26.88 $28.28 $29.13 $29.41 Residential Mobile Home Cart Service
96 Gallon Refuse 3 Cart Service $47.41 $52.11 $54.83 $56.46 $56.89 IUF Adjustment Factor 0.92 0.92 0.92 0.92 0.92
Adjusted Monthly Rate $43.45 $47.76 $50.25 $51.74 $52.10 64 Gallon Refuse 3 Cart Service $39.33 $43.23 $45.48 $46.83 $47.12 IUF Adjustment Factor 0.92 0.92 0.92 0.92 0.92
Adjusted Monthly Rate $36.06 $39.63 $41.69 $42.93 $43.16 Additional 96 Gallon Cart $24.45 $26.88 $28.28 $29.13 $29.41 IUF Adjustment Factor 0.92 0.92 0.92 0.92 0.92
Adjusted Monthly Rate $22.41 $24.63 $25.92 $26.70 $26.96 Commercial Refuse Cart Service
Unit Cost per Gallon per Tip $0.087 $0.096 $0.101 $0.104 $0.105 1026
City of Oxnard, California
Rate Study for Environmental Resources
Rate Design Examples
Appendix D
Average Monthly Tips (52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 96.0 96.0 96.0 96.0 96.0
Calculated Rate $36.39 $40.03 $42.14 $43.40 $43.89
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $36.51 $40.15 $42.26 $43.52 $44.01 Commercial ORGANIC Service
64 Gallon Cart Service
Unit Cost per Gallon per Tip $0.095 $0.104 $0.110 $0.113 $0.115 Average Monthly Tips (3x wk / 52 weeks / 12) 13.00 13.00 13.00 13.00 13.00 Cart Capacity Gallons 64.0 64.0 64.0 64.0 64.0
Calculated Rate $78.89 $86.78 $91.33 $94.07 $95.27
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $79.01 $86.90 $91.45 $94.19 $95.39 1 Cubic Yard Bin Service
Unit Cost per Gallon per Tip $0.095 $0.104 $0.110 $0.113 $0.115 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Container Capacity Gallons 202.0 202.0 202.0 202.0 202.0 Calculated Rate $82.99 $91.28 $96.08 $98.96 $100.22
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $83.11 $91.40 $96.20 $99.08 $100.34 2 Cubic Yard Bin Service
Unit Cost per Gallon per Tip $0.095 $0.104 $0.110 $0.113 $0.115 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Container Capacity Gallons 403.9 403.9 403.9 403.9 403.9 Calculated Rate $165.97 $182.57 $192.15 $197.92 $200.44 Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $166.09 $182.69 $192.27 $198.04 $200.56 3 Cubic Yard Bin Service
Unit Cost per Gallon per Tip $0.095 $0.104 $0.110 $0.113 $0.115 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Container Capacity Gallons 605.9 605.9 605.9 605.9 605.9 Calculated Rate $248.96 $273.85 $288.23 $296.88 $300.65 Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $249.08 $273.97 $288.35 $297.00 $300.77 4 Cubic Yard Bin Service
Unit Cost per Gallon per Tip $0.095 $0.104 $0.110 $0.113 $0.115 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Container Capacity Gallons 807.9 807.9 807.9 807.9 807.9 Calculated Rate $331.94 $365.14 $384.31 $395.84 $400.87 Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $332.06 $365.26 $384.43 $395.96 $400.99 Commercial REFUSE Bin Service
1 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.066 $0.072 $0.076 $0.078 $0.079 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 202.0 202.0 202.0 202.0 202.0
1027
City of Oxnard, California
Rate Study for Environmental Resources
Rate Design Examples
Appendix D
Calculated Rate $57.57 $63.32 $66.65 $68.65 $69.55
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $57.69 $63.44 $66.77 $68.77 $69.67 $0.00 $0.00 $0.00 $0.00 $0.00
1 Cubic Yard Shared Bin Service - 1x week
1 Cubic Yard Bin Service - 1x week $57.69 $63.44 $66.77 $68.77 $69.67 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $28.84 $31.72 $33.38 $34.38 $34.83 1 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.037 $0.040 $0.042 $0.044 $0.044 Unit Cost per Gallon per Tip - Disposal $0.029 $0.032 $0.034 $0.035 $0.035 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.058 $0.064 $0.068 $0.070 $0.071 Unit Cost per Gallon per Tip $0.095 $0.104 $0.110 $0.113 $0.115 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 202.0 202.0 202.0 202.0 202.0
Calculated Rate $83.11 $91.42 $96.22 $99.11 $100.44
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $83.23 $91.54 $96.34 $99.23 $100.56 2 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.066 $0.072 $0.076 $0.078 $0.079 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 403.9 403.9 403.9 403.9 403.9
Calculated Rate $115.13 $126.65 $133.29 $137.29 $139.10 Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $115.25 $126.77 $133.41 $137.41 $139.22 2 Cubic Yard Shared Bin Service - 1x week
2 Cubic Yard Bin Service - 1x week $115.25 $126.77 $133.41 $137.41 $139.22 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $57.63 $63.38 $66.71 $68.71 $69.61 2 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.037 $0.040 $0.042 $0.044 $0.044 Unit Cost per Gallon per Tip - Disposal $0.029 $0.032 $0.034 $0.035 $0.035 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.058 $0.064 $0.068 $0.070 $0.071 Unit Cost per Gallon per Tip $0.095 $0.104 $0.110 $0.113 $0.115 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 403.9 403.9 403.9 403.9 403.9
Calculated Rate $166.22 $182.84 $192.44 $198.22 $200.87 Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $166.34 $182.96 $192.56 $198.34 $200.99 3 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.066 $0.072 $0.076 $0.078 $0.079 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 605.9 605.9 605.9 605.9 605.9
Calculated Rate $172.70 $189.97 $199.94 $205.94 $208.64 Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $172.82 $190.09 $200.06 $206.06 $208.76 1028
City of Oxnard, California
Rate Study for Environmental Resources
Rate Design Examples
Appendix D
$172.82 $190.09 $200.06 $206.06 $208.76
3 Cubic Yard Shared Bin Service - 1x week
3 Cubic Yard Bin Service - 1x week $172.82 $190.09 $200.06 $206.06 $208.76 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $86.41 $95.04 $100.03 $103.03 $104.38 3 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.037 $0.040 $0.042 $0.044 $0.044 Unit Cost per Gallon per Tip - Disposal $0.029 $0.032 $0.034 $0.035 $0.035 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.058 $0.064 $0.068 $0.070 $0.071 Unit Cost per Gallon per Tip $0.095 $0.104 $0.110 $0.113 $0.115 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 605.9 605.9 605.9 605.9 605.9
Calculated Rate $249.33 $274.27 $288.66 $297.32 $301.31 Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $249.45 $274.39 $288.78 $297.44 $301.43 Commercial GREENWASTE Bin Service
1 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.034 $0.037 $0.039 $0.040 $0.041 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 202.0 202.0 202.0 202.0 202.0
Calculated Rate $29.57 $32.52 $34.23 $35.26 $35.69
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $29.69 $32.64 $34.35 $35.38 $35.81 $997.00 $1,096.69 $1,154.26 $1,188.88 $1,205.35
1 Cubic Yard Shared Bin Service - 1x week
1 Cubic Yard Bin Service - 1x week $29.69 $32.64 $34.35 $35.38 $35.81 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $14.84 $16.32 $17.18 $17.69 $17.91 1 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.026 $0.029 $0.031 $0.031 $0.032 Unit Cost per Gallon per Tip - Disposal $0.007 $0.008 $0.009 $0.009 $0.009 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.015 $0.016 $0.017 $0.018 $0.018 Unit Cost per Gallon per Tip $0.041 $0.045 $0.048 $0.049 $0.050 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 202.0 202.0 202.0 202.0 202.0
Calculated Rate $36.02 $39.62 $41.70 $42.95 $43.49
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $36.14 $39.74 $41.82 $43.07 $43.61 2 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.034 $0.037 $0.039 $0.040 $0.041 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 403.9 403.9 403.9 403.9 403.9
Calculated Rate $59.14 $65.05 $68.46 $70.52 $71.38
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 1029
City of Oxnard, California
Rate Study for Environmental Resources
Rate Design Examples
Appendix D
Total Monthly Rate per Cart $59.26 $65.17 $68.58 $70.64 $71.50 2 Cubic Yard Shared Bin Service - 1x week
2 Cubic Yard Bin Service - 1x week $59.26 $65.17 $68.58 $70.64 $71.50 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $29.63 $32.58 $34.29 $35.32 $35.75 2 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.026 $0.029 $0.031 $0.031 $0.032 Unit Cost per Gallon per Tip - Disposal $0.007 $0.008 $0.009 $0.009 $0.009 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.015 $0.016 $0.017 $0.018 $0.018 Unit Cost per Gallon per Tip $0.041 $0.045 $0.048 $0.049 $0.050 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 403.9 403.9 403.9 403.9 403.9
Calculated Rate $72.04 $79.24 $83.40 $85.91 $86.99
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $72.16 $79.36 $83.52 $86.03 $87.11 3 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.034 $0.037 $0.039 $0.040 $0.041 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 605.9 605.9 605.9 605.9 605.9
Calculated Rate $88.70 $97.57 $102.70 $105.78 $107.08
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $88.82 $97.69 $102.82 $105.90 $107.20 $0.00 $0.00 $0.00 $0.00 $0.00
3 Cubic Yard Shared Bin Service - 1x week
3 Cubic Yard Bin Service - 1x week $88.82 $97.69 $102.82 $105.90 $107.20 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $44.41 $48.85 $51.41 $52.95 $53.60 3 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.026 $0.029 $0.031 $0.031 $0.032 Unit Cost per Gallon per Tip - Disposal $0.007 $0.008 $0.009 $0.009 $0.009 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.015 $0.016 $0.017 $0.018 $0.018 Unit Cost per Gallon per Tip $0.041 $0.045 $0.048 $0.049 $0.050 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 605.9 605.9 605.9 605.9 605.9
Calculated Rate $108.06 $118.87 $125.11 $128.86 $130.48 Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $108.18 $118.99 $125.23 $128.98 $130.60 Commercial RECYCLING Bin Service
1 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.031 $0.034 $0.036 $0.037 $0.037 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 202.0 202.0 202.0 202.0 202.0
1030
City of Oxnard, California
Rate Study for Environmental Resources
Rate Design Examples
Appendix D
Calculated Rate $27.16 $29.88 $31.45 $32.39 $32.78
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $27.28 $30.00 $31.57 $32.51 $32.90 $0.00 $0.00 $0.00 $0.00 $0.00
1 Cubic Yard Shared Bin Service - 1x week
1 Cubic Yard Bin Service - 1x week $27.28 $30.00 $31.57 $32.51 $32.90 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $13.64 $15.00 $15.78 $16.25 $16.45 1 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.026 $0.029 $0.031 $0.031 $0.032 Unit Cost per Gallon per Tip - Disposal $0.005 $0.005 $0.005 $0.006 $0.006 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.009 $0.010 $0.011 $0.011 $0.011 Unit Cost per Gallon per Tip $0.036 $0.039 $0.041 $0.043 $0.043 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 202.0 202.0 202.0 202.0 202.0
Calculated Rate $31.21 $34.33 $36.13 $37.21 $37.68
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $31.33 $34.45 $36.25 $37.33 $37.80 2 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.031 $0.034 $0.036 $0.037 $0.037 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 403.9 403.9 403.9 403.9 403.9
Calculated Rate $54.32 $59.76 $62.89 $64.78 $65.57
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $54.44 $59.88 $63.01 $64.90 $65.69 2 Cubic Yard Shared Bin Service - 1x week
2 Cubic Yard Bin Service - 1x week $54.44 $59.88 $63.01 $64.90 $65.69 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $27.22 $29.94 $31.51 $32.45 $32.84 2 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.026 $0.029 $0.031 $0.031 $0.032 Unit Cost per Gallon per Tip - Disposal $0.005 $0.005 $0.005 $0.006 $0.006 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.009 $0.010 $0.011 $0.011 $0.011 Unit Cost per Gallon per Tip $0.036 $0.039 $0.041 $0.043 $0.043 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 403.9 403.9 403.9 403.9 403.9
Calculated Rate $62.42 $68.66 $72.26 $74.43 $75.35
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $62.54 $68.78 $72.38 $74.55 $75.47 3 Cubic Yard Bin Service - 1x week
Unit Cost per Gallon per Tip $0.031 $0.034 $0.036 $0.037 $0.037 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 605.9 605.9 605.9 605.9 605.9
Calculated Rate $81.48 $89.63 $94.34 $97.17 $98.35
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $81.60 $89.75 $94.46 $97.29 $98.47 1031
City of Oxnard, California
Rate Study for Environmental Resources
Rate Design Examples
Appendix D
$488.28 $537.10 $565.29 $582.25 $590.21
3 Cubic Yard Shared Bin Service - 1x week
3 Cubic Yard Bin Service - 1x week $81.60 $89.75 $94.46 $97.29 $98.47 Accounts 2.00 2.00 2.00 2.00 2.00
Calculated Monthly Fee per Account $40.80 $44.88 $47.23 $48.64 $49.23 3 Cubic Yard Bin Compactor Service - 1x week
Unit Cost per Gallon per Tip - Collection $0.026 $0.029 $0.031 $0.031 $0.032 Unit Cost per Gallon per Tip - Disposal $0.005 $0.005 $0.005 $0.006 $0.006 Compactor Factor 2.00 2.00 2.00 2.00 2.00
Adjusted Disposal Factor $0.009 $0.010 $0.011 $0.011 $0.011 Unit Cost per Gallon per Tip $0.036 $0.039 $0.041 $0.043 $0.043 Average Monthly Tips (1x wk / 52 weeks / 12) 4.33 4.33 4.33 4.33 4.33 Cart Capacity Gallons 605.9 605.9 605.9 605.9 605.9
Calculated Rate $93.62 $102.99 $108.39 $111.64 $113.03
Security and Prevention Fee $0.12 $0.12 $0.12 $0.12 $0.12 Total Monthly Rate per Cart $93.74 $103.11 $108.51 $111.76 $113.15 1032
1 NOTICE OF PUBLIC HEARING
NOTIFICACIÓN DE AUDIENCIA PÚBLICA

PROPOSED INCREASES TO SOLID WASTE SERVICES RATES, FEES & CHARGES

PARA CONSIDERAR LOS AUMENTOS PROPUESTOS

A LAS TARIFAS, TASAS Y CARGOS DE LOS SERVICIOS
DE RESIDUOS SÓLIDOS

NOTICE OF PUBLIC HEARING
6 p.m. Tuesday, March 19, 2024 Oxnard City Council Chambers 305 West Third Street, Oxnard, CA 93030
NOTIFICACIÓN DE AUDIENCIA PÚBLICA
Martes, 19 de marzo de 2024 a las 6 p.m.

Cámaras del Consejo de la Ciudad de Oxnard,
305 West Third Street, Oxnard, CA 93030
Formulario de protesta opcional. Consulte la información adjunta. Optional protest form. Please see enclosed information. ) Escriba su nombre completo (Print your full name /
I, ________________________________________________, protest the proposed solid waste rate increase. protesto por los aumentos propuestos de las tasas de residuos sólidos. Yo, Property Address: _______________________________________________________________________________________________________ Dirección de la propiedad:

Assessor’s Parcel Number (APN): ________________________________________ Signature: __________________________________________ Número de Parcela del Tasador (APN, por sus siglas en inglés): Firma:

City Clerk, 300 West Third Street, Fourth Floor, please fill out and submit by mail or in person to: If you wish to use this form as your protest, or deliver to the Oxnard City Clerk before the conclusion of the public hearing on Tuesday, March 19, 2024. Oxnard, CA 93030 Si desea utilizar este formulario como protesta, rellénelo y envíelo por correo o preséntelo en persona a: City Clerk, 300 West Third Street, Fourth Floor, Oxnard, CA 93030, o entréguelo al Secretario Municipal antes de la conclusión de la audiencia pública del martes, 19 de marzo de 2024.

I am the:

Soy el:

Property Owner
Dueño de la propiedad
Ratepayer (Customer)
Contribuyente (Cliente)
Scan for City Council Meetings
Reuniones del Ayuntamiento
City Clerk’s Office
300 W. Third Street, 4th Floor
Oxnard, CA 93030

PRESORTED

FIRST CLASS MAIL
U.S. POSTAGE PAID

OXNARD, CA
PERMIT NO. 399
1033
1 Si tiene alguna pregunta sobre
este aviso, las tarifas propuestas o
su servicio de residuos sólidos, la
Ciudad está organizando una reunión
comunitaria informativa en persona.

CUÁNDO:

Jueves, 29 de febrero de 2024
6:30-8 p.m.

DÓNDE:

South Oxnard Center
200 E Bard Rd, Oxnard 93033
If you have questions about this Notice,
proposed rates, or your solid waste
service, the City is hosting an in-person
informational community meeting.

WHEN:
6:30-8 p.m.

Thurs., February 29, 2024
WHERE:

South Oxnard Center
200 E Bard Rd, Oxnard 93033

INFORMATIONAL

COMMUNITY MEETING

QUESTIONS ABOUT

THIS NOTICE AND
PROPOSED RATES?
¿PREGUNTAS SOBRE ESTA
NOTIFICACIÓN Y LAS TARIFAS
PROPUESTOS?
REUNIÓN COMUNITARIA

INFORMATIVA

PROPOSED SOLID WASTE RATE INCREASES
Propuesta De Aumento De Las Tarifas De Residuos Sólidos PLEASE TAKE NOTICE THAT the Oxnard City Council will conduct a Public Hearing to consider proposed rates, fees, and charges for solid waste services (solid waste, recycling, organics/green waste). The City’s last solid waste rate study was conducted in 2012.

All Interested persons are invited to appear at the time and place of the Public Hearing (6 p.m. March 19, 2024, Oxnard City Council Chambers) to give oral or written testimony, as well as written protests, regarding proposed rate adjustments.

PUBLIC HEARING
6 p.m. March 19, 2024
Oxnard City Council Chambers

INFORMATION ON HOW TO PROTEST RATE INCREASES IS LOCATED AT THE END OF

THIS NOTICE
TOME NOTA DE QUE el Consejo de la Ciudad (Ayuntamiento) de Oxnard llevará a cabo una audiencia pública para considerar las tarifas, tasas y cargos propuestas para los servicios de residuos sólidos (residuos sólidos, reciclaje, residuos orgánicos/verdes). El último estudio de tarifas de residuos sólidos de la Ciudad se llevó a cabo en 2012.

Se invita a todas las personas interesadas a comparecer a la hora y en el lugar de la Audiencia Pública (19 de marzo de 2024 a las 6 p.m., Cámaras del Consejo de la Ciudad de Oxnard) para dar testimonio oral o escrito, así como protestas escritas, en relación con los ajustes de tarifas propuestos.

AUDIENCIA PÚBLICA
19 de marzo de 2024 a las 6 p.m.

Cámaras del Consejo de la Ciudad de Oxnard
AL FINAL DE ESTE ANUNCIO ENCONTRARÁ INFORMACIÓN SOBRE CÓMO PROTESTAR

CONTRA EL AUMENTO DE LAS TARIFAS
1034

HOW PROPOSED SOLID WASTE RATES WERE CALCULATED
The City of Oxnard is proposing to increase the rates for its solid waste service charges based on its most recent rate model and cost of service (COS) study conducted by an independent rates consultant. The City hired Raftelis Financial Consultants, Inc., a consulting firm with expertise in solid waste cost of service rate studies to evaluate the City’s costs of providing solid waste services and to proportionally allocate those costs to customer classes (residential, commercial, etc.). The rate study consists of a series of steps involving data evaluation, technical analyses, deriving customer rates, and understanding rate adjustment impacts on customers.

The financial analyses and rate model are documented in the Cost of Service Study Report to serve as part of the City’s administrative record with supporting data of how the proposed rates were developed. The proposed increases to the current rates over the next five years are listed in the tables contained in this Notice.

CÓMO SE CALCULARON LAS TASAS DE RESIDUOS SÓLIDOS
La Ciudad de Oxnard propone aumentar las tarifas de sus servicios de recolección de residuos basándose en sus modelo tarifarios más recientes y en un estudio del costo del servicio (COS, por sus siglas en inglés) realizado por un consultor de tarifas independiente. La Ciudad contrató a Raftelis Financial Consultants, Inc. una empresa consultora con experiencia en estudios de tarifas de costos de servicios de residuos sólidos para evaluar los costos de la prestación de servicios de recolección de residuos por parte de la Ciudad y asignar proporcionalmente dichos costos a los tipos de clientes (residenciales, comerciales, etc.). El estudio de tarifas consta de una serie de pasos que incluyen la evaluación de datos, análisis técnicos, derivación de tarifas a clientes y comprensión de las repercusiones de los ajustes de tarifas en los clientes.

Los análisis financieros y los modelo tarifarios se documentan en el Informe del Estudio del Costo del Servicio, que forma parte del expediente administrativo de la Ciudad para justificar las tarifas propuestas. Los aumentos propuestos para las tarifas actuales durante los próximos cinco años se enumeran en las tablas presentes en este Aviso. ¿POR QUÉ RECIBO ESTE AVISO?
La Ciudad envió por correo este Aviso a todos los propietarios registrados y clientes de residuos sólidos de conformidad con el Artículo XIII-D, Sección 6 de la Constitución de California (“Proposición 218”). La presente sirve como aviso de que el Concejo de la Ciudad de Oxnard llevará a cabo una Audiencia Pública en la hora, fecha y lugar mencionados en este Aviso para considerar los aumentos recomendados a las tarifas, tasas y cargos por residuos sólidos de la Ciudad.

En la Audiencia Pública, el Concejo de la Ciudad escuchará y considerará los aportes del público con respecto a los ajustes de tarifas propuestos y determinará si adopta las tarifas propuestas. El Consejo de la Ciudad no puede aumentar las tarifas más allá de las cantidades indicadas en este Aviso. Si se adoptan, los ajustes propuestos de las tarifas de residuos sólidos entrarían en vigor el 1 de julio de 2024, con ajustes anuales de las tarifas que entrarían en vigor el 1 de julio de cada año hasta 2028.

WHY AM I RECEIVING THIS NOTICE?
The City mailed this Notice to all property owners of record and solid waste customers in accordance with Article XIII-D, Section 6 of the California Constitution (“Proposition 218”). This serves as notice that the Oxnard City Council will conduct a Public Hearing at the time, date, and location identified in this Notice to consider recommended increases to the City’s solid waste rates, fees, and charges.

At the Public Hearing, the City Council will hear and consider public input regarding the proposed rate adjustments and determine whether to adopt the proposed rates. The City Council cannot increase rates beyond the amounts listed in this Notice. If adopted, proposed solid waste rate adjustments would become effective on July 1, 2024, with annual rate adjustments effective on July 1 of each year through 2028.

The Cost of Service Study Report is available on the City website at www.oxnard.org/refuserates.

Scan this code to be taken directly to the rates study webpage.

El informe del estudio del coste del servicio está disponible en la página web de la ciudad:
www.oxnard.org/refuserates. Escanee este código para acceder directamente a la página web del estudio de tarifas.
2 1035
3 ACERCA DE LOS SERVICIOS MUNICIPALES DE RECOLECCIÓN
DE RESIDUOS SÓLIDOS
La División de Recursos Ambientales (ER, por sus siglas en inglés) del Departamento de Obras Públicas de la Ciudad es una operación de fondos empresariales para brindar servicios de desechos sólidos a los residentes y comercios de Oxnard, que incluye la recolección, clasificación, procesamiento y eliminación para aproximadamente 34,480 clientes residenciales y 5.082 clientes comerciales y edificios de apartamentos seis días a la semana.

Un servicio de residuos sólidos fiable y eficiente es un componente clave para la salud pública, la seguridad y el bienestar de la comunidad. Los servicios incluyen la recolección, clasificación, transporte y traslado del material al vertedero.

Para brindar nuestros servicios cumpliendo con todos los requisitos locales, estatales y federales, ER:
• Recicla aproximadamente 24.900 toneladas de material y 22.000 toneladas de orgánicos (residuos verdes y residuos de alimentos)
• Anualmente maneja aproximadamente 317.100 toneladas (634.200.000 libras) de residuos sólidos
• Ha invertido aproximadamente 60 millones de dólares en equipamiento, instalaciones y terrenos, incluyendo la Estación Regional de Reciclaje y Transferencia Del Norte y aproximadamente 138 vehículos (109 camiones de gran tonelaje y 29 vehículos pequeños)
• Emplea a 179 trabajadores esenciales cumpliendo 529.443 horas al año.

ABOUT THE CITY’S SOLID WASTE SERVICES
The City’s Public Works Department Environmental Resources Division (ER) is an enterprise fund operation to provide solid waste services to Oxnard residents and businesses, which includes collection, sorting, processing, and disposal for approximately 34,480 residential customers and 5,082 commercial customers and apartment buildings six days a week.

Reliable and efficient solid waste service is a key component for the public health, safety, and welfare of the community. Services include collection, sorting, transportation, and transferring material to the landfill.

Additionally, to provide our services while meeting all Local, State, and Federal requirements, ER:
• Recycles approximately 24,900 tons of material and 22,000 tons of organics (green waste and food waste)
• Annually handles approximately 317,100 tons (634,200,000 lbs) of solid waste
• Has invested approximately $60 million in capital equipment, facilities, and land including the Del Norte Regional Recycling and Transfer Station and approximately 138 vehicles (109 heavy-duty trucks & 29 small vehicles)
• Employs 179 essential workers fulfilling 529,443 hours per year ¿QUÉ PASA SI NO SUBIMOS LAS TASAS?
Si no se aumentan las tarifas, el servicio a los clientes puede verse afectado y la salud pública y ambiental podrían verse afectadas. Las tarifas actuales no son suficientes para mantener las operaciones diarias y los servicios de desechos de residuos. El aplazamiento hasta más adelante se traducirá en mayores costos y posiblemente en un aumento de la supervisión reglamentaria y de las multas significativas por parte de los organismos estatales. Nos veríamos obligados a aplazar la adquisición de equipos y los proyectos de infraestructura que dejarían vulnerables nuestras operaciones y sistema actuales de muchas maneras, algunas de las cuales se enumeran a continuación:
• Reducción de la frecuencia de recolección de residuos sólidos, materiales reciclables, orgánicos y residuos verdes.
• La menor frecuencia de recogida puede provocar problemas de salud y seguridad, incluyendo enfermedades, olores desagradables y plagas, y puede aumentar los vertidos ilegales.
• El mantenimiento diferido puede provocar averías frecuentes en la flota y ocasionar costos de horas extras e interrupciones del servicio. • El incumplimiento de los requisitos normativos estatales podría dar lugar a la imposición de multas de hasta 10.000 dólares por incidente por parte de Cal Recycle.

WHAT HAPPENS IF WE DO NOT RAISE RATES?
If rates are not raised, the service to customers may be affected and public and environmental health could be impacted. Current rates are not sufficient to sustain daily operations and waste disposal services. Deferring until later will result in higher costs and possibly increased regulatory oversight and significant fines by State agencies. We would be forced to defer the acquisition of equipment and infrastructure projects that would leave our existing operations and system vulnerable in many ways, some of which are listed below:
• Reduction in the pickup frequency of solid waste, recyclables, organics, and green waste.
• Less frequent pickups may lead to health and safety issues including disease, unwelcome odors and pests, and may
increase illegal dumping.
• Deferred maintenance may result in frequent fleet breakdowns and cause increased overtime costs and service disruptions. • Failure to meet State regulatory requirements could result in fines up to $10,000 per incident from Cal Recycle.
1036
4 TARIFAS PROPUESTAS
La Ciudad ofrece a los residentes un servicio de recolección semanal mediante un sistema de tres contenedores para la basura, el reciclaje y los residuos orgánicos. La tarifa mensual para los residentes incluye un carro para cada uno de sus residuos domésticos (basura, reciclaje y residuos orgánicos).

Los carros adicionales están disponibles por una tarifa adicional. Junto con el servicio de recolección residencial, la Ciudad realizará recolección en acera a los clientes no residenciales y comerciales.

PROPOSED RATES
The City provides residents with weekly collection services using a three-bin system for their garbage, recycling, and organic waste. The monthly rate for residents includes one cart for each of their household waste (garbage, recycling, and organic waste). Any additional carts are available for an additional fee. Along with residential collection service, the City provides curbside collection to non-residential and commercial customers.

THE REASON FOR PROPOSED SOLID WASTE RATE INCREASES
The Oxnard City Council will consider rate changes that will affect solid waste service rates, fees, and charges due to inflation and rising costs of operations, maintenance, and environmental and regulatory compliance.

This critical service is funded in large part by the rates customers pay. Per California law, revenues generated from rates and rate increases must only be used to fund the actual costs to operate and maintain the service including the cost of debt to finance capital equipment and maintaining cash and reserves.

The City’s last rate study for solid waste services was conducted in 2012. Over the past 10 years, the residential rate (96-gallons) only increased .63ȼ per month, or 2.1% for residential service. The most popular commercial rate (4-yard/once per week) increased by 2.7% or $6.05. Yet, over the same decade, the consumer price index increased by 33.9%.

The proposed rates are needed to provide adequate funding for operations; capital funding; cost increases for collecting, processing and disposing of solid waste; labor and equipment costs; fuel charges; recyclables collection and processing; public education and implementing State of California mandated solid waste diversion programs; and to maintain compliance with internal minimum cash reserve targets.

The proposed rate increases to the applicable customer classifications include new costs associated with providing commercial organics collection, along with the administration, enforcement, and education of both commercial and residential organics collection programs.

Pursuant to the State’s regulatory requirements to implement Senate Bill (SB) 1383 (Chapter 395, Statutes of 2016), the City must provide organic waste collection. The proposed rates will ensure that the City collects sufficient revenue to maintain reliable service, run solid waste services efficiently and consistently with industry standards, and fulfill state-mandated recycling services.

MOTIVOS DEL AUMENTO PROPUESTO DE LAS TASAS DE RESIDUOS SÓLIDOS El Consejo de la Ciudad de Oxnard estudiará cambios en las tarifas que afectarán a las tarifas, tasas y cargos de los servicios de recolección de residuos sólidos debido a la inflación y al aumento de los costos de funcionamiento, mantenimiento y cumplimiento de la normativa medioambiental.

Este servicio crítico se financia en gran parte con las tarifas que pagan los clientes. Según la legislación de California, los ingresos generados por las tarifas y los aumentos de tarifas sólo deben utilizarse para financiar los costos reales de funcionamiento y mantenimiento del servicio, incluido el costo de la deuda para financiar equipamiento y el mantenimiento de la tesorería y las reservas.

El último estudio de tarifas de la Ciudad para los servicios de residuos sólidos se llevó a cabo en 2012. En los últimos 10 años, la tarifa residencial (96 galones) solo aumentó 0,63 centavos por mes, o un 2,1% para el servicio residencial. La tarifa comercial más popular (4 yardas/una vez por semana) aumentó un 2,7% o 6,05 dólares. Sin embargo, durante la misma década, el índice de precios al consumo aumentó un 33,9%.

Las tarifas propuestas son necesarias para brindar una financiación adecuada para las operaciones; financiación de capital; aumentos de costos para la recolección, procesamiento y eliminación de residuos sólidos; costos de mano de obra y equipos; cargos por combustible; recolección y procesamiento de reciclables; educación pública e implementación de programas de desviación de residuos sólidos obligatorios del Estado de California; y para mantener el cumplimiento de los objetivos internos de reserva mínima de efectivo.

Los aumentos de tarifas propuestos para las clasificaciones de clientes aplicables incluyen nuevo los costos asociados a la recolección de residuos orgánicos comerciales, junto con la administración, aplicación y educación de los programas de recolección de residuos orgánicos tanto comerciales como residenciales.

De conformidad con los requisitos reglamentarios del Estado para implementar el Proyecto de Ley 1383 (Capítulo 395, Estatutos de 2016), la Ciudad debe proveer la recolección de residuos orgánicos. Las tarifas propuestas garantizarán que la Ciudad recaude ingresos suficientes para mantener un servicio confiable, administrar servicios de residuos sólidos de manera eficiente y consistente con los estándares de la industria, y cumplir con los servicios de reciclaje exigidos por el estado.
1037
Residential Residencial
TABLE 1: PROPOSED FIVE-YEAR RESIDENTIAL MONTHLY SOLID WASTE, RECYCLING, ORGANICS / GREEN WASTE 3-CART SERVICE Tabla 1: Calendario propuesto de cinco años para el servicio residencial mensual de 3 carros para residuos sólidos, reciclaje y residuos orgánicos/verdes Current
Actual
July 1, 2024
1 de julio de
2024
July 1, 2025
1 de julio de
2025
July 1, 2026
1 de julio de
2026
July 1, 2027
1 de julio de
2027
July 1, 2028
1 de julio de
2028
3 Cart Service/64-gallon Servicio de 3 carros/64 galones 1x/week 1x/semana $24.70 $39.33 $43.23 $45.48 $46.83 $47.12 3 Cart Service/96-gallon Servicio de 3 carros /96 galones 1x/week 1x/semana $30.78 $47.41 $52.11 $54.83 $56.46 $56.89 Extra 96 Gallons Cart Service Contenedor extra (96 galones) 1x/week 1x/semana $11.34 $24.45 $26.88 $28.28 $29.13 $29.41 Multi-Family - 2 Units* Residencial multifamiliar 2 Unidades 1x/week 1x/semana $58.51 N/A N/A N/A N/A N/A
Multi-Family - 3 Units* Residencial multifamiliar 3 Unidades 1x/week 1x/semana $84.73 N/A N/A N/A N/A N/A
Multi-Family - 4 Units* Residencial multifamiliar 4 Unidades 1x/week 1x/semana $109.43 N/A N/A N/A N/A N/A
*The City currently charges separate service rates for multi-family residences with four units or less. Under the proposed rates, all multi-family customers, excluding mobile homes, receiving cart service will be charged the residential 3-cart service rate with the option to receive either 64-gallon or 96-gallon service as listed in Table 1. *En la actualidad, la Ciudad cobra tarifas de servicio separadas para las residencias multifamiliares con cuatro unidades o m enos. Con las tarifas propuestas, a todos los clientes multifamiliares, excluidas las casas móviles, que reciban el servicio de carros se les cobrará el servicio residencial de 3 carros con la opción de recibir un servicio de 64 galones o de 96 galones, como se indica en la Tabla 1.

TABLE 2: PROPOSED FIVE-YEAR SCHEDULE OF RESIDENTIAL MOBILE HOME MONTHLY SOLID WASTE, RECYCLING, ORGANICS / GREEN WASTE 3-CART SERVICE
Tabla 2: Calendario propuesto de cinco años para el servicio mensual de 3 carros de recolección de residuos sólidos, reciclables, orgánicos y verdes de las residencias móviles
Current
Actual
July 1, 2024
1 de julio de
2024
July 1, 2025
1 de julio de
2025
July 1, 2026
1 de julio de
2026
July 1, 2027
1 de julio de
2027
July 1, 2028
1 de julio de
2028
3 Cart Service/64-gallon Servicio de 3 carros/64 galones 1x/week 1x/semana N/A $36.06 $39.63 $41.69 $42.93 $43.16 3 Cart Service/96-gallon Servicio de 3 carros/96 galones 1x/week 1x/semana N/A $43.45 $47.76 $50.25 $51.74 $52.10 Extra 96 Gallons Cart Service Contenedor extra (96 galones) 1x/week 1x/semana N/A $22.41 $24.63 $25.92 $26.70 $26.96 En ta tabla 2, el Ayuntamiento propone una nueva clasificación de clientes según la tarifa de móviles residenciales determinada por las conclusiones del estudio de tarifas sobre el coste del servicio.

In Table 2, the City is proposing a new residential mobile home rate customer classification determined by the cost of service findings of the rate study.
5 Residential Mobile Home Casa Móvil Residencial
1038
6 TABLE 3: PROPOSED FIVE-YEAR SCHEDULE OF SOLID WASTE SERVICE RATES FOR MULTI-FAMILY RESIDENTIAL (MFR) OVER 4 UNITS AND

COMMERCIAL SERVICE BY FREQUENCY AND CONTAINER SIZE (IN CUBIC YARDS) TABLA 3: Calendario propuesto de cinco años para tarifas de servicio de RESIDUOS SÓLIDOS para el servicio residencial multifamiliar (MFR) de más de 4 unidades y el servicio comercial por frecuencia y tamaño de contenedor (en yardas cúbicas) Current Actual July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
1 cu yd bin 1 yarda cúbica
1x/week 1x/semana N/A $57.69 $63.44 $66.77 $68.77 $69.67 2x/week 2x/semana N/A $115.20 $126.71 $133.36 $137.35 $139.22 3x/week 3x/semana N/A $172.72 $189.98 $199.95 $205.94 $208.76 4x/week 4x/semana N/A $230.24 $253.25 $266.54 $274.53 $278.31 5x/week 5x/semana N/A $287.75 $316.52 $333.13 $343.12 $347.86 6x/week 6x/semana N/A $345.27 $379.78 $399.72 $411.70 $417.41 1 cu yd-shared 1 yarda cúbica compartida
1x/week 1x/semana N/A $28.84 $31.72 $33.38 $34.38 $34.83 2x/week 2x/semana N/A $57.60 $63.36 $66.68 $68.68 $69.61 3x/week 3x/semana N/A $86.36 $94.99 $99.97 $102.97 $104.38 4x/week 4x/semana N/A $115.12 $126.62 $133.27 $137.26 $139.16 5x/week 5x/semana N/A $143.88 $158.26 $166.56 $171.56 $173.93 6x/week 6x/semana N/A $172.63 $189.89 $199.86 $205.85 $208.70 1 cu yd-compactor 1 yarda cúbica compactada
1x/week 1x/semana N/A $83.23 $91.54 $96.34 $99.23 $100.56 2x/week 2x/semana N/A $166.29 $182.91 $192.51 $198.28 $200.99 3x/week 3x/semana N/A $249.35 $274.28 $288.67 $297.33 $301.43 4x/week 4x/semana N/A $332.41 $365.64 $384.83 $396.37 $401.86 5x/week 5x/semana N/A $415.48 $457.01 $481.00 $495.42 $502.30 6x/week 6x/semana N/A $498.54 $548.38 $577.16 $594.47 $602.73 2 cu yd 2 yardas cúbicas
1x/week 1x/semana $132.76 $115.25 $126.77 $133.41 $137.41 $139.22 2x/week 2x/semana $232.25 $230.29 $253.30 $266.59 $274.59 $278.31 3x/week 3x/semana $298.56 $345.32 $379.84 $399.77 $411.76 $417.41 4x/week 4x/semana $364.87 $460.35 $506.37 $532.95 $548.94 $556.50 5x/week 5x/semana $431.21 $575.38 $632.91 $666.13 $686.11 $695.60 6x/week 6x/semana $497.53 $690.42 $759.45 $799.31 $823.29 $834.69 2 cu yd-shared 2 yardas cúbicas compartida
1x/week 1x/semana $66.44 $57.63 $63.38 $66.71 $68.71 $69.61 2x/week 2x/semana $116.18 $115.14 $126.65 $133.30 $137.29 $139.16 3x/week 3x/semana $149.37 $172.66 $189.92 $199.89 $205.88 $208.70 4x/week 4x/semana $182.51 $230.18 $253.19 $266.48 $274.47 $278.25 5x/week 5x/semana $215.67 $287.69 $316.46 $333.07 $343.06 $347.80 6x/week 6x/semana $248.83 $345.21 $379.72 $399.66 $411.64 $417.35 2 cu yd-compactor yardas cúbicas compactada
1x/week 1x/semana $284.35 $166.34 $182.96 $192.56 $198.34 $200.99 2x/week 2x/semana $497.34 $332.46 $365.70 $384.89 $396.43 $401.86 3x/week 3x/semana $639.64 $498.59 $548.43 $577.22 $594.53 $602.73 4x/week 4x/semana $781.75 $664.71 $731.17 $769.55 $792.63 $803.61 5x/week 5x/semana $923.88 $830.83 $913.90 $961.88 $990.73 $1,004.48 6x/week 6x/semana $1,065.99 $996.95 $1,096.64 $1,154.20 $1,188.83 $1,205.35 Table 3 Continues Next Page/Tabla 3 Continúa en la página siguiente Multi-Family Residential Over 4 Units and Commercial
Residencial Multifamiliar Más de 4 Unidades Y Comercial 1039
7 TABLE 3 CONTINUED/TABLA 3 CONTINUACIÓN:

Current Actual July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
3 cu yd yardas cúbicas
1x/week 1x/semana N/A $172.82 $190.09 $200.06 $206.06 $208.76 2x/week 2x/semana N/A $345.37 $379.89 $399.83 $411.82 $417.41 3x/week 3x/semana N/A $517.92 $569.70 $599.60 $617.58 $626.05 4x/week 4x/semana N/A $690.47 $759.50 $799.37 $823.35 $834.69 5x/week 5x/semana N/A $863.02 $949.31 $999.14 $1,029.11 $1,043.33 6x/week 6x/semana N/A $1,035.57 $1,139.11 $1,198.91 $1,234.87 $1,251.98 3 cu yd-shared yardas cúbicas compartida
1x/week 1x/semana N/A $86.41 $95.04 $100.03 $103.03 $104.38 2x/week 2x/semana N/A $172.68 $189.95 $199.92 $205.91 $208.70 3x/week 3x/semana N/A $258.96 $284.85 $299.80 $308.79 $313.02 4x/week 4x/semana N/A $345.23 $379.75 $399.68 $411.67 $417.35 5x/week 5x/semana N/A $431.51 $474.65 $499.57 $514.55 $521.67 6x/week 6x/semana N/A $517.78 $569.56 $599.45 $617.44 $625.99 3 cu yd-compactor 3 yardas cúbicas compactada
1x/week 1x/semana N/A $249.45 $274.39 $288.78 $297.44 $301.43 2x/week 2x/semana N/A $498.64 $548.49 $577.28 $594.59 $602.73 3x/week 3x/semana N/A $747.82 $822.59 $865.77 $891.74 $904.04 4x/week 4x/semana N/A $997.00 $1,096.69 $1,154.26 $1,188.88 $1,205.35 5x/week 5x/semana N/A $1,246.19 $1,370.79 $1,442.75 $1,486.03 $1,506.65 6x/week 6x/semana N/A $1,495.37 $1,644.89 $1,731.24 $1,783.18 $1,807.96 4 cu yd yardas cúbicas
1x/week 1x/semana $230.86 $230.29 $253.30 $266.59 $274.59 $278.31 2x/week 2x/semana $403.90 $460.35 $506.37 $532.95 $548.94 $556.50 3x/week 3x/semana $519.26 $690.42 $759.45 $799.31 $823.29 $834.69 4x/week 4x/semana $634.63 $920.48 $1,012.52 $1,065.67 $1,097.64 $1,112.88 5x/week 5x/semana $749.98 $1,150.55 $1,265.59 $1,332.03 $1,371.99 $1,391.07 6x/week 6x/semana $865.36 $1,380.62 $1,518.66 $1,598.39 $1,646.34 $1,669.26 4 cu yd-shared yardas cúbicas compartida
1x/week 1x/semana $115.47 $115.14 $126.65 $133.30 $137.29 $139.16 2x/week 2x/semana $202.02 $230.18 $253.19 $266.48 $274.47 $278.25 3x/week 3x/semana $259.70 $345.21 $379.72 $399.66 $411.64 $417.35 4x/week 4x/semana $317.36 $460.24 $506.26 $532.84 $548.82 $556.44 5x/week 5x/semana $375.06 $575.27 $632.80 $666.01 $685.99 $695.54 6x/week 6x/semana $432.71 $690.31 $759.33 $799.19 $823.17 $834.63 4 cu yd-compactor 4 yardas cúbicas compactada
1x/week 1x/semana $464.93 $332.46 $365.70 $384.89 $396.43 $401.86 2x/week 2x/semana $813.53 $664.71 $731.17 $769.55 $792.63 $803.61 3x/week 3x/semana $1,045.93 $996.95 $1,096.64 $1,154.20 $1,188.83 $1,205.35 4x/week 4x/semana $1,278.32 $1,329.20 $1,462.11 $1,538.86 $1,585.02 $1,607.09 5x/week 5x/semana $1,510.72 $1,661.44 $1,827.57 $1,923.52 $1,981.22 $2,008.83 6x/week 6x/semana $1,743.12 $1,993.69 $2,193.04 $2,308.17 $2,377.41 $2,410.58 1040
8 TABLE 4: PROPOSED FIVE-YEAR SCHEDULE OF RECYCLE SERVICE RATES FOR MULTI-FAMILY RESIDENTIAL (MFR) OVER 4 UNITS AND

COMMERCIAL SERVICE BY FREQUENCY AND CONTAINER SIZE (IN CUBIC YARDS) Tabla 4: Calendario propuesto de cinco años para tarifas de servicio de RECICLAJE para servicios residenciales multifamiliares (MFR) de más de 4 unidades y comerciales por frecuencia y tamaño de contenedor (en yardas cúbicas) Current Actual July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
1 cu yd bin 1 yarda cúbica
1x/week 1x/semana N/A $27.28 $30.00 $31.57 $32.51 $32.90 2x/week 2x/semana N/A $54.39 $59.82 $62.95 $64.84 $65.69 3x/week 3x/semana N/A $81.51 $89.64 $94.34 $97.17 $98.47 4x/week 4x/semana N/A $108.62 $119.47 $125.73 $129.50 $131.25 5x/week 5x/semana N/A $135.73 $149.29 $157.12 $161.83 $164.04 6x/week 6x/semana N/A $162.84 $179.11 $188.51 $194.16 $196.82 1 cu yd-shared 1 yarda cúbica compartida
1x/week 1x/semana N/A $13.64 $15.00 $15.78 $16.25 $16.45 2x/week 2x/semana N/A $27.20 $29.91 $31.48 $32.42 $32.84 3x/week 3x/semana N/A $40.75 $44.82 $47.17 $48.59 $49.23 4x/week 4x/semana N/A $54.31 $59.73 $62.87 $64.75 $65.63 5x/week 5x/semana N/A $67.86 $74.64 $78.56 $80.92 $82.02 6x/week 6x/semana N/A $81.42 $89.56 $94.26 $97.08 $98.41 1 cu yd-compactor 1 yarda cúbica compactada
1x/week 1x/semana N/A $31.33 $34.45 $36.25 $37.33 $37.80 2x/week 2x/semana N/A $62.49 $68.72 $72.32 $74.49 $75.47 3x/week 3x/semana N/A $93.64 $103.00 $108.40 $111.65 $113.15 4x/week 4x/semana N/A $124.80 $137.27 $144.47 $148.80 $150.82 5x/week 5x/semana N/A $155.96 $171.54 $180.54 $185.96 $188.50 6x/week 6x/semana N/A $187.12 $205.82 $216.62 $223.11 $226.17 2 cu yd 2 yardas cúbicas
1x/week 1x/semana $62.48 $54.44 $59.88 $63.01 $64.90 $65.69 2x/week 2x/semana $109.24 $108.67 $119.52 $125.79 $129.56 $131.25 3x/week 3x/semana $140.43 $162.89 $179.17 $188.57 $194.22 $196.82 4x/week 4x/semana $171.60 $217.11 $238.81 $251.34 $258.88 $262.38 5x/week 5x/semana $202.78 $271.34 $298.46 $314.12 $323.54 $327.95 6x/week 6x/semana $233.96 $325.56 $358.11 $376.90 $388.20 $393.52 2 cu yd-shared 2 yardas cúbicas compartida
1x/week 1x/semana $31.29 $27.22 $29.94 $31.51 $32.45 $32.84 2x/week 2x/semana $54.68 $54.33 $59.76 $62.89 $64.78 $65.63 3x/week 3x/semana $70.28 $81.45 $89.58 $94.28 $97.11 $98.41 4x/week 4x/semana $85.85 $108.56 $119.41 $125.67 $129.44 $131.19 5x/week 5x/semana $101.45 $135.67 $149.23 $157.06 $161.77 $163.98 6x/week 6x/semana $117.03 $162.78 $179.05 $188.45 $194.10 $196.76 2 cu yd-compactor 2 yardas cúbicas compactada
1x/week 1x/semana $133.74 $62.54 $68.78 $72.38 $74.55 $75.47 2x/week 2x/semana $233.96 $124.85 $137.32 $144.53 $148.86 $150.82 3x/week 3x/semana $300.77 $187.17 $205.87 $216.67 $223.17 $226.17 4x/week 4x/semana $367.58 $249.48 $274.42 $288.82 $297.48 $301.53 5x/week 5x/semana $434.38 $311.80 $342.97 $360.97 $371.79 $376.88 6x/week 6x/semana $501.19 $374.12 $411.52 $433.11 $446.10 $452.23 Table 4 Continues Next Page/Tabla 4 Continúa en la página siguiente 1041
9 TABLE 4 CONTINUED/TABLA 4 CONTINUACIÓN
Current Actual July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
3 cu yd 3 yardas cúbicas
1x/week 1x/semana N/A $81.60 $89.75 $94.46 $97.29 $98.47 2x/week 2x/semana N/A $162.94 $179.22 $188.62 $194.28 $196.82 3x/week 3x/semana N/A $244.28 $268.69 $282.79 $291.27 $295.17 4x/week 4x/semana N/A $325.61 $358.16 $376.96 $388.26 $393.52 5x/week 5x/semana N/A $406.95 $447.63 $471.12 $485.25 $491.87 6x/week 6x/semana N/A $488.28 $537.10 $565.29 $582.25 $590.21 3 cu yd-shared 3 yardas cúbicas compartida
1x/week 1x/semana N/A $40.80 $44.88 $47.23 $48.64 $49.23 2x/week 2x/semana N/A $81.47 $89.61 $94.31 $97.14 $98.41 3x/week 3x/semana N/A $122.14 $134.35 $141.40 $145.64 $147.58 4x/week 4x/semana N/A $162.81 $179.08 $188.48 $194.13 $196.76 5x/week 5x/semana N/A $203.47 $223.81 $235.56 $242.63 $245.93 6x/week 6x/semana N/A $244.14 $268.55 $282.65 $291.12 $295.11 3 cu yd-compactor 3 yardas cúbicas compactada
1x/week 1x/semana N/A $93.74 $103.11 $108.51 $111.76 $113.15 2x/week 2x/semana N/A $187.22 $205.93 $216.73 $223.23 $226.17 3x/week 3x/semana N/A $280.69 $308.75 $324.95 $334.70 $339.20 4x/week 4x/semana N/A $374.17 $411.57 $433.17 $446.16 $452.23 5x/week 5x/semana N/A $467.64 $514.39 $541.39 $557.63 $565.26 6x/week 6x/semana N/A $561.11 $617.21 $649.61 $669.10 $678.28 4 cu yd 4 yardas cúbicas
1x/week 1x/semana $108.58 $108.67 $119.52 $125.79 $129.56 $131.25 2x/week 2x/semana $189.95 $217.11 $238.81 $251.34 $258.88 $262.38 3x/week 3x/semana $244.80 $325.56 $358.11 $376.90 $388.20 $393.52 4x/week 4x/semana $298.40 $434.01 $477.40 $502.46 $517.53 $524.65 5x/week 5x/semana $352.63 $542.46 $596.69 $628.01 $646.85 $655.78 6x/week 6x/semana $406.87 $650.90 $715.98 $753.57 $776.17 $786.91 4 cu yd-shared 4 yardas cúbicas compartida
1x/week 1x/semana $54.35 $54.33 $59.76 $62.89 $64.78 $65.63 2x/week 2x/semana $95.03 $108.56 $119.41 $125.67 $129.44 $131.19 3x/week 3x/semana $122.15 $162.78 $179.05 $188.45 $194.10 $196.76 4x/week 4x/semana $149.26 $217.00 $238.70 $251.23 $258.76 $262.32 5x/week 5x/semana $176.39 $271.23 $298.35 $314.01 $323.42 $327.89 6x/week 6x/semana $203.48 $325.45 $357.99 $376.78 $388.08 $393.46 4 cu yd-compactor 4 yardas cúbicas compactada
1x/week 1x/semana $218.62 $124.85 $137.32 $144.53 $148.86 $150.82 2x/week 2x/semana $382.51 $249.48 $274.42 $288.82 $297.48 $301.53 3x/week 3x/semana $491.77 $374.12 $411.52 $433.11 $446.10 $452.23 4x/week 4x/semana $601.02 $498.75 $548.61 $577.41 $594.73 $602.93 5x/week 5x/semana $709.99 $623.38 $685.71 $721.70 $743.35 $753.63 6x/week 6x/semana $819.53 $748.01 $822.80 $865.99 $891.97 $904.34 1042
10 TABLE 5: PROPOSED FIVE-YEAR SCHEDULE OF GREENWASTE SERVICE RATES FOR MULTI-FAMILY RESIDENTIAL (MFR) OVER 4 UNITS AND

COMMERCIAL SERVICE BY FREQUENCY AND CONTAINER SIZE (IN CUBIC YARDS) Tabla 5: Calendario propuesto de cinco años para tarifas de servicio de RESIDUOS VERDES para residencias multifamiliares (MFR) de más de 4 unidades y servicio comercial por frecuencia y tamaño de contenedor (en yardas cúbicas) Current Actual July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
1 cu yd bin 1 yarda cúbica
1x/week 1x/semana N/A $29.69 $32.64 $34.35 $35.38 $35.81 2x/week 2x/semana N/A $59.21 $65.11 $68.53 $70.58 $71.50 3x/week 3x/semana N/A $88.72 $97.58 $102.70 $105.78 $107.20 4x/week 4x/semana N/A $118.24 $130.05 $136.88 $140.98 $142.89 5x/week 5x/semana N/A $147.76 $162.52 $171.05 $176.18 $178.58 6x/week 6x/semana N/A $177.28 $194.99 $205.22 $211.38 $214.27 1 cu yd-shared 1 yarda cúbica compartida
1x/week 1x/semana N/A $14.84 $16.32 $17.18 $17.69 $17.91 2x/week 2x/semana N/A $29.60 $32.56 $34.26 $35.29 $35.75 3x/week 3x/semana N/A $44.36 $48.79 $51.35 $52.89 $53.60 4x/week 4x/semana N/A $59.12 $65.03 $68.44 $70.49 $71.44 5x/week 5x/semana N/A $73.88 $81.26 $85.52 $88.09 $89.29 6x/week 6x/semana N/A $88.64 $97.50 $102.61 $105.69 $107.14 1 cu yd-compactor 1 yarda cúbica compactada
1x/week 1x/semana N/A $36.14 $39.74 $41.82 $43.07 $43.61 2x/week 2x/semana N/A $72.11 $79.31 $83.47 $85.97 $87.11 3x/week 3x/semana N/A $108.08 $118.88 $125.11 $128.86 $130.60 4x/week 4x/semana N/A $144.05 $158.44 $166.76 $171.76 $174.10 5x/week 5x/semana N/A $180.02 $198.01 $208.40 $214.65 $217.59 6x/week 6x/semana N/A $215.99 $237.58 $250.05 $257.54 $261.09 2 cu yd 2 yardas cúbicas
1x/week 1x/semana $62.48 $59.26 $65.17 $68.58 $70.64 $71.50 2x/week 2x/semana $109.24 $118.29 $130.11 $136.93 $141.04 $142.89 3x/week 3x/semana $140.43 $177.33 $195.05 $205.28 $211.44 $214.27 4x/week 4x/semana $171.60 $236.36 $259.99 $273.63 $281.84 $285.66 5x/week 5x/semana $202.78 $295.40 $324.93 $341.98 $352.24 $357.04 6x/week 6x/semana $233.96 $354.44 $389.87 $410.33 $422.63 $428.43 2 cu yd-shared 2 yardas cúbicas compartida
1x/week 1x/semana $31.29 $29.63 $32.58 $34.29 $35.32 $35.75 2x/week 2x/semana $54.68 $59.15 $65.05 $68.47 $70.52 $71.44 3x/week 3x/semana $70.28 $88.66 $97.52 $102.64 $105.72 $107.14 4x/week 4x/semana $85.85 $118.18 $129.99 $136.82 $140.92 $142.83 5x/week 5x/semana $101.45 $147.70 $162.46 $170.99 $176.12 $178.52 6x/week 6x/semana $117.03 $177.22 $194.93 $205.16 $211.32 $214.21 2 cu yd-compactor 2 yardas cúbicas compactada
1x/week 1x/semana $133.74 $72.16 $79.36 $83.52 $86.03 $87.11 2x/week 2x/semana $233.96 $144.10 $158.50 $166.81 $171.81 $174.10 3x/week 3x/semana $300.77 $216.04 $237.63 $250.10 $257.60 $261.09 4x/week 4x/semana $367.58 $287.98 $316.77 $333.39 $343.39 $348.08 5x/week 5x/semana $434.38 $359.92 $395.90 $416.68 $429.18 $435.07 6x/week 6x/semana $501.19 $431.86 $475.04 $499.97 $514.97 $522.05 Table 5 Continues Next Page/Tabla 5 Continúa en la página siguiente 1043
11 Current Actual July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
3 cu yd 3 yardas cúbicas
1x/week 1x/semana N/A $88.82 $97.69 $102.82 $105.90 $107.20 2x/week 2x/semana N/A $177.38 $195.10 $205.34 $211.50 $214.27 3x/week 3x/semana N/A $265.93 $292.51 $307.86 $317.09 $321.35 4x/week 4x/semana N/A $354.48 $389.92 $410.39 $422.69 $428.43 5x/week 5x/semana N/A $443.04 $487.33 $512.91 $528.29 $535.51 6x/week 6x/semana N/A $531.59 $584.74 $615.43 $633.89 $642.58 3 cu yd-shared 3 yardas cúbicas compartida
1x/week 1x/semana N/A $44.41 $48.85 $51.41 $52.95 $53.60 2x/week 2x/semana N/A $88.69 $97.55 $102.67 $105.75 $107.14 3x/week 3x/semana N/A $132.97 $146.26 $153.93 $158.55 $160.68 4x/week 4x/semana N/A $177.24 $194.96 $205.19 $211.35 $214.21 5x/week 5x/semana N/A $221.52 $243.67 $256.45 $264.15 $267.75 6x/week 6x/semana N/A $265.80 $292.37 $307.72 $316.95 $321.29 3 cu yd-compactor 3 yardas cúbicas compactada
1x/week 1x/semana N/A $108.18 $118.99 $125.23 $128.98 $130.60 2x/week 2x/semana N/A $216.09 $237.69 $250.16 $257.66 $261.09 3x/week 3x/semana N/A $324.00 $356.39 $375.09 $386.34 $391.57 4x/week 4x/semana N/A $431.91 $475.09 $500.03 $515.03 $522.05 5x/week 5x/semana N/A $539.82 $593.80 $624.96 $643.71 $652.54 6x/week 6x/semana N/A $647.74 $712.50 $749.90 $772.39 $783.02 4 cu yd 4 yardas cúbicas
1x/week 1x/semana $108.58 $118.29 $130.11 $136.93 $141.04 $142.89 2x/week 2x/semana $189.95 $236.36 $259.99 $273.63 $281.84 $285.66 3x/week 3x/semana $244.80 $354.44 $389.87 $410.33 $422.63 $428.43 4x/week 4x/semana $298.40 $472.51 $519.75 $547.03 $563.43 $571.20 5x/week 5x/semana $352.63 $590.58 $649.63 $683.72 $704.23 $713.97 6x/week 6x/semana $406.87 $708.65 $779.50 $820.42 $845.03 $856.74 4 cu yd-shared 4 yardas cúbicas compartida
1x/week 1x/semana $54.35 $59.15 $65.05 $68.47 $70.52 $71.44 2x/week 2x/semana $95.03 $118.18 $129.99 $136.82 $140.92 $142.83 3x/week 3x/semana $122.15 $177.22 $194.93 $205.16 $211.32 $214.21 4x/week 4x/semana $149.26 $236.25 $259.87 $273.51 $281.72 $285.60 5x/week 5x/semana $176.39 $295.29 $324.81 $341.86 $352.12 $356.98 6x/week 6x/semana $203.48 $354.33 $389.75 $410.21 $422.52 $428.37 4 cu yd-compactor 4 yardas cúbicas compactada
1x/week 1x/semana $218.62 $144.10 $158.50 $166.81 $171.81 $174.10 2x/week 2x/semana $382.51 $287.98 $316.77 $333.39 $343.39 $348.08 3x/week 3x/semana $491.77 $431.86 $475.04 $499.97 $514.97 $522.05 4x/week 4x/semana $601.02 $575.75 $633.31 $666.55 $686.54 $696.03 5x/week 5x/semana $709.99 $719.63 $791.58 $833.13 $858.12 $870.01 6x/week 6x/semana $819.53 $863.51 $949.85 $999.71 $1,029.70 $1,043.99 TABLE 5 CONTINUED/TABLA 5 CONTINUACIÓN
1044
TABLE 6: PROPOSED FIVE-YEAR SCHEDULE OF ORGANIC SERVICE RATES FOR MULTI-FAMILY RESIDENTIAL (MFR) OVER 4 UNITS

AND COMMERCIAL SERVICE BY FREQUENCY AND CONTAINER SIZE (IN CUBIC YARDS) TABLA 6: Calendario propuesto de cinco años para tarifas de servicio ORGÁNICO para viviendas multifamiliares (MFR) de más de 4 unidades y servicio comercial por frecuencia y tamaño de contenedor (en yardas cúbicas) Current Actual July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
64-gallon 64 galones
3x/week 3x/semana $63.80 $79.01 $86.90 $91.45 $94.19 $95.39 1 cu yd 1 yarda cúbica
1x/week 1x/semana N/A $83.11 $91.40 $96.20 $99.08 $100.34 2 cu yd 2 yardas cúbicas
1x/week 1x/semana N/A $166.09 $182.69 $192.27 $198.04 $200.56 3 cu yd 3 yardas cúbicas
1x/week 1x/semana N/A $249.08 $273.97 $288.35 $297.00 $300.77 4 cu yd 4 yardas cúbicas
1x/week 1x/semana N/A $332.06 $365.26 $384.43 $395.96 $400.99 Bin service is offered up to 6x/week. Rates shown are monthly charges for 1x/week service. Service rates of more than 1x/week are determined by multiplying the desired frequency per week of collection service by the applicable rate. El servicio de contenedores se ofrece hasta 6 veces por semana. Las tarifas indicadas son mensuales para el servicio de 1 vez por semana. Las tarifas de servicio de más de 1 vez por semana se determinan multiplicando la frecuencia deseada por semana de servicio de recolección por la tarifa aplicable.

TABLE 7: PROPOSED FIVE-YEAR SCHEDULE OF SOLID WASTE SERVICE RATES FOR 1X/ WEEK COMMERCIAL CART SERVICE

BY QUANTITY OF CARTS
Tabla 7: Calendario propuesto de cinco años para tarifas de servicio de RESIDUOS SÓLIDOS para el servicio de carros comerciales 1 vez por semana por cantidad de carros
Current
Actual
July 1, 2024
1 de julio de
2024
July 1, 2025
1 de julio de
2025
July 1, 2026
1 de julio de
2026
July 1, 2027
1 de julio de
2027
July 1, 2028
1 de julio de
2028
1 96-gallon cart 1 carro de 96 galones
1x/week 1x/semana $43.53 $36.51 $40.15 $42.26 $43.52 $44.01 2 96-gallon cart 2 carro de 96 galones
1x/week 1x/semana $76.16 $73.03 $80.31 $84.51 $87.04 $88.01 3 96-gallon cart 3 carro de 96 galones
1x/week 1x/semana $97.94 $109.54 $120.46 $126.77 $130.56 $132.02 4 96-gallon cart 4 carro de 96 galones
1x/week 1x/semana $119.73 $146.06 $160.61 $169.02 $174.08 $176.03 5 96-gallon cart 5 carro de 96 galones
1x/week 1x/semana $141.51 $182.57 $200.77 $211.28 $217.60 $220.04 6 96-gallon cart 6 carro de 96 galones
1x/week 1x/semana $247.16 $219.09 $240.92 $253.53 $261.12 $264.04 Commercial Comercial
12 1045
Industrial Industrial
Oxnard industrial service is provided via open-top roll-off containers on an on-call basis. The Environmental Resources Division does not provide compactors, however, it does provide service for them. Industrial service capacities that generate more than four cubic yards of waste per week are required by law to have recycling and organic collection service, or an alternative diversion program in place (with limited exceptions).

El servicio industrial de Oxnard se presta a través de contenedores abiertos de carga rodante a demanda. La División de Recursos Ambientales no brinda compactadores, sin embargo, sí les presta servicio. Las capacidades de servicio industrial que generan más de cuatro yardas cúbicas de residuos a la semana están obligadas por ley a disponer de un servicio de recolección de reciclables y orgánicos, o de un programa alternativo de desvío (con excepciones limitadas).

TABLE 8: PROPOSED FIVE-YEAR SCHEDULE OF SERVICE RATES FOR INDUSTRIAL COLLECTION BY MATERIAL PER PULL Tabla 8: Calendario propuesto de cinco años para tarifas para la recolección industrial según material a extraer TABLE 9: PROPOSED FIVE-YEAR SCHEDULE OF RENTAL RATES FOR INDUSTRIAL BINS Tabla 9: Calendario propuesto de quinquenal de tarifas mensuales y diarias de alquiler de contenedores industriales Current
Actual
July 1, 2024
1 de julio de
2024
July 1, 2025
1 de julio de
2025
July 1, 2026
1 de julio de
2026
July 1, 2027
1 de julio de
2027
July 1, 2028
1 de julio de
2028
Up to 10-cu yd Roll Off Bin (max 10 tons)
Hasta contenedor con rodados de 10 yardas
cúbicas (máximo 10 toneladas)
$147.73 $269.43 $296.38 $311.94 $321.30 $325.79
Up to 13.4 cu yd Roll Off Bin (max 10
tons)
Hasta contenedor con rodados de 13.4 yardas
cúbicas (máximo 10 toneladas)
$147.73 $269.43 $296.38 $311.94 $321.30 $325.79
Up to 20 cu yd Roll Off Bin
Hasta contenedor con rodados de 20 yardas
cúbicas
N/A $269.43 $296.38 $311.94 $321.30 $325.79
Up to 20 cu yd Compactor
Hasta compactador de 20 yardas cúbicas $192.85 $269.43 $296.38 $311.94 $321.30 $325.79 Up to 30 cu yd Roll Off Bin
Hasta contenedor con rodados de 30 yardas
cúbicas
$193.56 $269.43 $296.38 $311.94 $321.30 $325.79
(2) 30 cu yd Roll Off Bin
(2) Hasta contenedor con rodados de 30
yardas cúbicas
$371.86 N/A N/A N/A N/A N/A
30 cu yd Compactor
Compactador de 30 yardas cúbicas $219.04 $269.43 $296.38 $311.94 $321.30 $325.79 40 cu yd Roll Off Bin
Contenedor con rodados de 40 yardas cúbicas $238.84 $269.43 $296.38 $311.94 $321.30 $325.79 40 cu yd Compactor
Compactador de 40 yardas cúbicas $269.98 $269.43 $296.38 $311.94 $321.30 $325.79 Current
Actual
July 1, 2024
1 de julio de
2024
July 1, 2025
1 de julio de
2025
July 1, 2026
1 de julio de
2026
July 1, 2027
1 de julio de
2027
July 1, 2028
1 de julio de
2028
10 cu yd Roll Off Bin
Contenedor con rodados de 10
yardas cúbicas
Monthly/Mensual
Daily/Diario N/A $46.45$1.53
$47.84
$1.57
$49.28
$1.62
$50.76
$1.67
$52.28
$1.72

13.4 cu yd Roll Off Bin
Contenedor con rodados de 13.4
yardas cúbicas
Monthly/Mensual
Daily/Diario N/A $49.99
$1.64
$51.49
$1.69
$53.03
$1.74
$54.62
$1.80
$56.26
$1.85
20 cu yd Sealed Roll Off Bin
Contenedor con rodados de 20
yardas cúbicas
Monthly/Mensual
Daily/Diario N/A $67.30$2.21
$69.32
$2.28
$71.40
$2.35
$73.54
$2.42
$75.75
$2.49
30 cu yd Roll Off Bin
Contenedor con rodados de 30
yardas cúbicas
Monthly/Mensual
Daily/Diario N/A $58.05$1.91
$59.79
$1.97
$61.58
$2.02
$63.43
$2.09
$65.33
$2.15
40 cu yd Roll Off Bin
Contenedor con rodados de 40
yardas cúbicas
Monthly/Mensual
Daily/Diario N/A $66.48$2.19
$68.47
$2.25
$70.52
$2.32
$72.64
$2.39
$74.82
$2.46
40 cu yd Sealed Roll Off Bin
Contenedor rodante cerrado de
40 yardas cúbicas
Monthly/Mensual
Daily/Diario N/A $87.09$2.86
$89.70
$2.95
$92.39
$3.04
$95.16
$3.13
$98.01
$3.22
Please reference Tables 9 and 11 for additional fees. Consulte los cuadros 9 y 11 para conocer las tasas adicionales. 13 1046
TABLE 11: PROPOSED FIVE-YEAR SCHEDULE OF TIPPING FEES FOR INDUSTRIAL SERVICE PER TON OF WEIGHED MATERIAL AND SECURITY

AND CONTAMINATION PREVENTION FEE
Tabla 11: Calendario propuesto de cinco años para tasas de vertido para de servicios industriales por tonelada de material pesado y tasa de seguridad y prevención de la contaminación
Current Actual July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
Del Norte Tip Fee (Per Ton) Tasa de vertedero de Del Norte (Por tonelada) Solid Waste
Residuos Sólidos $55.59 $93.88 $103.27 $108.69 $111.95 $113.52 Comingled Recycling
Reciclado mixto N/A $44.26 $48.68 $51.24 $52.77 $53.51
Green Waste
Desechos Verdes $62.81 $105.53 $116.08 $122.18 $125.84 $127.61 Organics
Orgánico N/A $171.95 $189.14 $199.08 $205.05 $207.92
Walking Floor Transfer Trailer Tip Fee (Per Ton) Tasa de vertedero de traslado con piso movible (Por tonelada) Solid Waste
Residuos Sólidos N/A $34.63 $35.67 $36.74 $37.84 $38.98 Security and Contamination Prevention Fee (Monthly, Per Bin) Tasa de seguridad y prevención de la contaminación (Mensual, Por contenedor) All Containers
Todos los contenedores $0.12 $0.12 $0.12 $0.12 $0.12 $0.12 TABLE 10: PROPOSED FIVE-YEAR SCHEDULE OF SOLID WASTE WALKING FLOOR TRANSFER TRAILER RATES FOR INDUSTRIAL

SERVICE PER PULL/TRANSFER
Tabla 10: Calendario propuesto de cinco años para tarifas de los remolques de traslado con piso móvil de RESIDUOS SÓLIDOS para el servicio industrial por extracción/transferencia
53-Foot Walking
Floor Trailer
Remolques de piso
móvil de 53 pies
Current
Actual
July 1, 2024
1 de julio de 2024
July 1, 2025
1 de julio de 2025
July 1, 2026
1 de julio de 2026
July 1, 2027
1 de julio de 2027
July 1, 2028
1 de julio de 2028
$371.85 $384.86 $398.34 $412.28 $426.71 $441.64
The enclosed rate recommendations were presented to the Oxnard City Council on December 5, 2023.

A video of the meeting is available on the City’s YouTube page at www.youtube.com/oxnardnews.

The Rate Study Report is available on the website at www.oxnard.org/refuserates.

Scan this code to be taken directly to the Rate Study webpage.

El 5 de diciembre de 2023, se presentaron las recomendaciones de tarifas adjuntas al Consejo de la Ciudad de Oxnard. Está disponible un vídeo de la reunión en la página de YouTube de la ciudad en www.youtube.com/oxnardnews. El informe del estudio de tarifas está disponible en el sitio web www.oxnard.org/refuserates. Escanee este código para acceder directamente a la página web del estudio de tarifas.
14 Please reference Tables 9 for additional fees. Consulte los cuadros 9 para conocer las tasas adicionales. 1047
16 HOW DO I PROTEST THE
PROPOSED RATE INCREASES?
You have the right to protest the proposed rate increases.

Each written protest must (1) state the name of the identified property owner or utility customer; (2) provide the location of the identified property by street address or assessor’s parcel number; and (3) include an original signature of the
submitting property owner or utility customer. You may use the enclosed protest form or prepare a written document with the required information stated above indicating that you are protesting the proposed rates. Only one written protest per affected property will be counted.

Written protests may be submitted by mail or in person to the Oxnard City Clerk’s Office, 300 West Third Street, 4th Floor, Oxnard, CA 93030, and submitted in person during the public hearing on Tuesday, March 19, 2024.

Written protests must be received by the City Clerk
prior to the conclusion of the Public Hearing on Tuesday, March 19, 2024. The Clerk will not accept or consider any protest received after the conclusion of the Public Hearing.

At the Public Hearing, the City Council will accept and consider all written protests and hear all oral comments on the Proposed Changes. At the conclusion of the public hearing, the City Council will consider adoption of the proposed changes as follows:
(1) If less than a majority of property owners or ratepayers file a protest, the City Council will consider increasing solid waste rates, effective July 1, 2024.
(2) If a majority of affected property owners or ratepayers protest the increase, the City Council is prohibited by law from increasing solid waste rates.

If adopted, the proposed solid waste rates will take effect beginning July 1, 2024. The reasons for the rate adjustments, the basis upon which they were calculated, and the amount of the proposed rates are described in more detail in the Cost of Service Study Report, which is on file with the City Clerk and available on the City website at
www.oxnard.org/refuserates.

For more information, please refer to Oxnard Resolution No. 14,877 for Procedures for Establishing and Increasing Fees and Charges Under Proposition 218, available at
www.oxnard.org/refuserates.
¿CÓMO PUEDO PROTESTAR CONTRA LOS
AUMENTOS DE TARIFAS PROPUESTOS?
Tiene derecho a protestar contra los aumentos propuestos de las tasas. Cada protesta por escrito debe (1) indicar el nombre del propietario o cliente del servicio público identificado; (2) proporcionar la ubicación de la propiedad identificada por dirección o número de parcela del asesor; y (3) incluir una firma original del propietario o cliente del servicio público que presenta la protesta. Puede utilizar el formulario de protesta adjunto o preparar un documento escrito con la información requerida anteriormente indicando que está protestando contra las tarifas propuestas. Solo se contará una protesta por escrito por propiedad afectada.

Las protestas por escrito pueden ser presentadas por correo o en persona durante la audiencia pública o antes de la conclusión de la audiencia pública el martes, 19 de marzo de 2024 a: Oxnard City Clerk’s Office (Oficina de la Secretaría de la Ciudad de Oxnard), 300 West Third Street, 4th Floor, Oxnard, CA 93030
Las protestas por escrito deben ser recibidas por el Secretario de la Ciudad antes de la conclusión de la audiencia pública el martes, 19 de marzo de 2024. El Secretario no aceptará ni considerará ninguna protesta recibida después de la conclusión de la Audiencia Pública.

En la audiencia pública, el Consejo de la Ciudad aceptará y considerará todas las protestas escritas y escuchará todos los comentarios orales sobre los cambios propuestos. Al término de la audiencia pública, el Consejo de la Ciudad considerará la adopción de los cambios propuestos de la siguiente manera:
(1) Si menos de la mayoría de los propietarios o contribuyentes presentan una protesta, el Consejo de la Ciudad considerará el aumento de las tasas de basura, a partir del 1 de julio de 2024. (2) Si la mayoría de los propietarios o contribuyentes afectados protestan contra el aumento, el Consejo de la Ciudad tiene prohibido por ley aumentar las tasas de residuos sólidos.

Si se aprueban, las tarifas de residuos sólidos propuestas entrarán en vigor el 1 de julio de 2024. Las razones de los ajustes de las tarifas, la base sobre la que se calcularon y el importe de las tarifas propuestas se describen con más detalle en el Informe del Estudio del Costo del Servicio, que está archivado en la Secretaría de la Ciudad y disponible en el sitio web de la Ciudad en www.oxnard.org/refuserates.

Para más información, consulte la Resolución de Oxnard No. 14.877 sobre los procedimientos para establecer y aumentar las tasas y los cargos en virtud de la Proposición 218, disponible en
www.oxnard.org/refuserates.

CONTACT ¿Preguntas?
Questions and comments may be submitted via email to [email protected] or by calling the Public Works Department at (805) 385-8060. Las preguntas y comentarios pueden enviarse por correo electrónico a [email protected] o llamando al Departamento de Obras Públicas al (805) 385-8060. 1048
Environmental Resources
(Solid Waste) Rates Update
Report
Public Works and Transportation Committee
February 27, 2024
City Council Meeting
March 4, 2024
Brian Yanez
Assistant Public Works Director
1049
FOR PUBLIC WORKS AND TRANSPORTATION COMMITTEE:

That the Public Works & Transportation Committee recommend that the City Council receive and file the Solid Waste Rates Update Report.

FOR CITY COUNCIL:

That the City Council receive and file the Solid Waste Rates Update Report.

RECOMMENDATION 2
1050
• At the December 5, 2023, City Council meeting (Meeting), four solid waste rate scenarios were presented for discussion and feedback
• Staff and the City’s solid waste rate consultant (Raftelis) discussed the scenarios and the following topics:
• Rate-setting process
• Legal requirements
• Financial planning
• Solid waste cost of service
• Rate design
BACKGROUND 3
1051
City Council provided their feedback and recommended Scenario 3:

Rate Adjustments and Full Capital Expenditures which:
• Fully funds the projected revenue requirements with greater near-term rate adjustments, but lower overall increases over the five-year rate adjustment period compared to Scenario 4 • Projects all funding requirements including operating, capital, and proposed capital lease and debt payments
DISCUSSION 4
1052
Key assumptions for Scenario 3 include:

I. Fiscal Year 2023/2024 Served as the baseline for the Rate Study Period as adjusted for actual operating results and known cost increases;

1. The operating expense growth is estimated at 4.2% per year; II. Assumes some additional collection routes to maintain regulatory compliance with AB1826, AB827, SB1383, and regular service demands;
III. Assumes Infrastructure Use Fee (IUF) repayments from the City to ER ends in Fiscal Year 2024;
IV. Assumes resumption of IUF payments in Fiscal Year 2025 to the City;
DISCUSSION 5
1053
Key assumptions for Scenario 3 (Continued):

V. $40.7M reinvestment into the Material Recycling Facility (MRF) including new equipment and roof in Fiscal Year 2026 to Fiscal Year 2028
VI. Replacement of vehicles at end of life in Fiscal Year 2024/2025 VII. Compliance with CARB Zero Emissions Vehicle Requirements

1. Primarily relies on use of capital leases and debt to fully fund capital expenditures
VIII. Represents necessary rate adjustments to fund a fiscally sustainable operation and maintain regulatory compliance, and; DISCUSSION 6
1054
Key assumptions for Scenario 3 (Continued):

2. Proceed with creating and sending the required Proposition 218 notices to all solid waste customers and property owners

3. Target a rate-setting public hearing and the introduction of a new ordinance containing the proposed solid waste rates at the City Council meeting on March 19, 2024

4. Plan on adopting the Ordinance at the City Council meeting on April 16, 2024
DISCUSSION 7
1055
Final Cost of Service
The final Cost of Service study is complete and available online at:
www.oxnard.org/refuserates
DISCUSSION 8
1056
The table below represents a comparison of the preliminary estimated residential rates (three 96-gallon cart service) presented to Council on December 5, 2023, and the final rates included in the Prop 218 notice:

DISCUSSION 9
FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Presented to Council 12/5/23
Monthly Rate - 3 Cart Service with
96-gallon refuse cart
$46.17 $49.86 $52.60 $55.23 $56.89
Prop 218 Notice
Monthly Rate - 3 Cart Service with
96-gallon refuse cart
$47.41 $52.11 $54.83 $56.46 $56.89
Difference
Change in Proposed Monthly Bill $1.24 $2.25 $2.23 $1.23 ($0.00) 1057
The Cost of Service study provides three primary objectives:

1. Develop a financial plan for the ER Fund to ensure financial sufficiency, meet operations and maintenance costs, provide funding for capital replacement and renewal (R&R) needs and improve the financial health of the enterprise;

2. Review the current rate structure for the ER Fund and propose recommended changes based on the cost of service; and

3. Perform a cost allocation and prepare a recommended five-year schedule of rates and fees for the ER Fund.

DISCUSSION 10
1058
Schedule
• City’s Resolution Number 14,877 outlines the procedures for establishing and increasing fees and charges under Proposition 218
• Proposition 218 notices were mailed to the required recipients, pursuant to the timeline required by the State
• Upcoming rate-setting Public Hearing and introduction of the proposed solid waste rate ordinance is scheduled for March 19, 2024
DISCUSSION 11
1059
Outreach
In addition to the December 5, 2023, City Council meeting, three community meetings were held on the following dates:
• November 15, 2023, South Oxnard Library
• December 13, 2023, City Council Chambers
• January 30, 2024, City Council Chambers
Upcoming
• February 29, 2024, in-person town-hall style meeting at the South Oxnard Library
• March 6, 2024, Inter-Neighborhood Council Organization (INCO) meeting at the City Council Chambers
DISCUSSION 12
1060
There is no financial impact from receiving this Solid Waste Rates Update Report.

FINANCIAL IMPACT 13
1061

QUESTIONS
14 1062

CITY COUNCIL AGENDA REPORT

REPORTS
AGENDA ITEM NO. N.2
DATE: March 4, 2024
TO: City Council
FROM: Emilio Ramirez, Housing Director, (805) 385-8094, [email protected] SUBJECT: Aspire Apartments – Preliminary Funding Award Letter and Affordable Housing and Sustainable Communities Program (AHSC) Implementation Agreement. (10 minutes)

RECOMMENDATION
That the City Council:

1. Authorize the Mayor, or his designee, to execute a Preliminary Funding Award Letter with Many Mansions, a nonprofit affordable housing provider, for gap financing in the amount of $1,200,000 for the construction of eighty-eight (87) affordable rental units and one (1) unrestricted manager’s unit, commonly known as Aspire Apartments located at 536- 538 Meta Street, Oxnard, CA 93030;

2. Authorize the Mayor, or his designee, to execute an Implementation Agreement with Many Mansions to receive passthrough grant funding associated with the Aspire Apartments Affordable Housing and Sustainable Communities Program application.
(Due to the release date of the grant (January 19, 2024, this item did not originate in the Committee) Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/F8SdCpg2pk0

BACKGROUND
Many Mansions is a non-profit housing organization that provides affordable housing to households with low-incomes by constructing new or acquiring and rehabilitating existing housing units, in partnership with cities and counties. Since its founding over forty years ago, Many Mansions has amassed a portfolio of over 600 units of affordable housing at twenty properties throughout Ventura County.

One project worth mentioning specifically is Central Terrace, located at 27-17-235 East 6th Street in Downtown Oxnard, just south of the subject project site. Central Terrace includes eighty-six (86) affordable rental units, with thirty-five (35) of the units set-aside for homeless individuals. The project is currently under construction and opening in May 2024.

In December 2022, Many Mansions purchased a .77-acre site located at 536-538 Meta Street, just north of the Central Terrace project, for the development of the Aspire Apartments (Project), a multi-family affordable rental housing project that includes eighty-seven (87) affordable units, plus one (1) two-bedroom unrestricted manager’s unit. The eighty-seven (87) affordable units comprise fifty-six (56) one-bedroom units and thirty-one (31) two-bedroom units, all serving households earning between thirty-percent (30%) and sixty percent (60%) of the area median income. The Aspire Apartments project received approval of a Major Downtown Design Development Review Permit at the Community Development Director Hearing held on June 27, 2022.The mixed-use project will include five stories of residential units above a podium with an elevator, and includes approximately 4,549 square feet of office and commercial space, a 5,185 square foot private courtyard, and a 5,606 square foot public open space (Paseo). 1063
HOME ARP Program Funding
On September 20, 2021, the U.S. Department of Housing and Urban Development (HUD) awarded the City of Oxnard $2,772,021 in HOME American Rescue Plan (HOME-ARP) funding. HOME-ARP is a new funding source from the Federal government for local and state governments to address homelessness and affordable housing needs, streamlined through the HOME (HOME) Investment Partnership program.

From December 2022 through February 2023, Housing Staff completed substantial community outreach to solicit feedback on how best to prioritize the use of the HOME-ARP funding. The overwhelmingly feedback received was to prioritize the creation of new permanent supportive housing. On March 21, 2023, City Council approved the City’s HOME-ARP Allocation Plan, which directed staff to utilize its HOME-ARP program funding to support the creation of new permanent supportive housing (no specific projects included).

Affordable Housing and Sustainable Communities Program
Similar to the Central Terrace project, Many Mansions’ financing plan for Aspire Apartments involves submission of an application to the Affordable Housing and Sustainable Communities Program (the "AHSC"), which is administered by the California Strategic Growth Council. The AHSC Program funds housing and transportation infrastructure that support infill and compact development that reduce greenhouse gas emissions.

AHSC provides grants and/or loans, or any combination thereof, to achieve greenhouse gas emissions reductions through increasing accessibility of affordable housing, employment centers, and key destinations via low-carbon transportation resulting in fewer vehicle miles traveled through shortened or reduced trip length or mode shift from single occupancy vehicle use to transit, bicycling, or walking.

AHSC can fund up to $35 Million in loan funds for construction of affordable housing developments. The program can also fund up to $15 million in grant funds under the same application for housing related infrastructure, sustainable transportation infrastructure, transit-related amenities and programs.

The City was asked by Many Mansions to participate in their AHSC application for their Aspire Apartments project. If awarded, the City would receive funding to complete City planned projects including sustainable transportation infrastructure and transit-related amenities and community programs.

The AHSCP Notice of Funding Availability was issued on January 19, 2024 and has a submission deadline of March 19, 2024. This March 19, 2024 deadline is the reason that staff could not take this item to the Council Committee, as well as a separate report on the subject Council agenda titled "Prohousing Designation". As detailed in the "Prohousing Designation" report, On July 1, 2021, the California Department of Housing and Community Development (HCD) established the Prohousing Designation Program (“Program”) to achieve Stae housing goals. This Program enables HCD to designate jurisdictions throughout the state as Prohousing when they demonstrate policies and planning programs that accelerate the production of housing. The benefits to jurisdictions receiving the Prohousing designation include priority processing and being granted additional points when participating in various HCD funded programs. In an effort to assist Many Mansions in obtaining bonus Prohousing points for their Aspire Apartments AHSC application, the Prohousing application must be submitted to HCD prior to the AHSC application. As such there was no time to take either of these items to Council Committee prior to the March 19, 2024 AHSC deadline.

DISCUSSION
Financing Plan, Development Schedule, and Preliminary Funding Award Letter The total development cost for the Aspire Apartments project is estimated at approximately $58 million. While a majority of the funding needed to complete the Project is projected to come from Federal and State resources, there is a gap in the development project. Many Mansion's requested funding from the City of Oxnard to close the funding gap. To address the gap, the Housing Department requests awarding $1,200,000 in HOME-ARP to Many Mansions’ to support Aspire Apartments. Many Mansions is a successful builder and manager of affordable housing throughout Ventura County and has several thriving rental projects, including Central Terrace, along with the capacity to complete this project. 1064
Listed in the table below are the Projects proposed permanent financing sources.

Funding Source Amount
City of Oxnard HOME-ARP Loan (Public - City) $1,200,000 Accrued Deferred Interest – City HOME-ARP Loan (Public - City) $51,076 Permanent Loan (Private) $3,072,000
Affordable Housing and Sustainable Communities Loan (Public - State)
$25,000,000
Developer Equity (Private) $100
Deferred Developer Fee (Private) $4,249,656
Tax Credit Equity (Public - State) $24,215,345
Total Development Cost $57,788,177
If Many Mansions is able to secure all of the private and public funding listed above in their first attempt, then Many Mansions would begin construction in June 2025 and complete construction in December of 2026.

In order to have a competitive AHSC funding application, the developer must demonstrate that the Project is financially feasible and has enforceable funding commitments. In an effort to support Many Mansions AHSC application, the Housing Department requests the issuance of a preliminary funding award letter in support of Aspire Apartments. The preliminary funding award letter commits $1,200,000 in HOME-ARP funding to support the development of Aspire Apartments.

By providing this amount in HOME-ARP, Aspire Apartments must provide five (5) one-bedroom permanent supportive housing units for homeless households with annual incomes at or below thirty-percent (30%) of the area median income.

All five (5) units will carry a twenty-year (20) affordability restriction. In addition to the HOME-ARP affordability restrictions, the Project’s entitlements require all unitsto remain affordable for fifty-five (55) years and serve households with incomes between thirty-percent (30%) and eighty-percent (80%) of the area median income.

The preliminary funding award letter outlines the general terms of the City’s financial assistance, which are summarized below:

1. The principal amount of the loan shall not exceed $1,200,000;

2. The term of the loan shall be for 55 years;

3. Three percent simple interest;

4. Repayment of the City Loan will be based residual receipts with fifty percent of the residual receipts split pro-rata among all soft lenders based on the original principal amount of each soft lender loan; and

5. The Preliminary Award shall expire on December 31, 2025, unless otherwise extended by the Housing Director.

If Many Mansions secures its State and Federal financing, Housing Staff will return to City Council for final approval of the HOME-ARP loan and regulatory agreements.

Affordable Housing and Sustainable Communities Program Participation 1065
The AHSC Program offers a unique opportunity for not only Many Mansions to receive funding to develop Aspire Apartments, but also to collaborate with the City and Community Partners to improve the built environment and provide critical community programs.

City Staff coordinated with Many Mansions, Gold Coast Transit District and various community partners to identify eligible high impact sustainable transportation improvements, transit related amenities and community serving programs.

Listed in the table below are the eligible projects that have been identified and will be included in Many Mansions’ AHSC Application.

Item Project Description Responsible Entity Estimated Funding Request
1 Aspire Affordable Rental Housing
Development and Housing Related
Infrastructure
Many Mansions $25,000,000
2 Wooley Road Resurfacing and
Protected Bike Lane Improvements
3 Oxnard Transit Center Improvements
4 Downtown Oxnard Sidewalk Repairs
5 New Downtown Bus Stops with
Pedestrian Enhancements
City of Oxnard Public Works $5,083,000
6 Purchase forty-two (42) new electric
vans to support the vanpool program in
Ventura County.

California Vanpool Authority $3,780,000
7 Workplace Literacy Program for
Immigrants and Refugees Program.

Economic Development
Collaborative
$70,000
8 Outreach to increase Oxnard
enrollment into the Building Trades
Pre-Apprenticeship Program.

Tri-Counties Building and
Construction Trades Council
$40,000
10 Tenant legal counseling to Oxnard
residents.

The Law Offices of Barbara
Macri-Ortiz
$340,000
11 Community outreach to support the
City of Oxnard’s Rent Stabilization
and Just Cause Ordinances
City of Oxnard - Housing
Department
$150,000
12 Construct a volunteer nursery and
educational space at the vacant lot
located at the southwest corner of 6th
and C Street.

Mini Nature Reserve $137,000
Staff recommends that the City partner with Many Mansions in an effort to receive grant funding to support vital City projects and programs.
1066
Implementation Agreement between Many Mansions and the City To memorialize the partnership, staff recommends the execution of an Implementation Agreement with Many Mansions for the completion of the City-led sustainable transportation infrastructure, transit-related amenities and programs (Items 2,3,4,5, and 10 listed above) that will be included in Many Mansions Affordable Housing and Sustainable Communities application. For the non-city projects and programs, Many Mansions will enter into a separate implementation agreement with the responsible entities. For reference, Council authorized a similar agreement and for City projects identified in the AHSC program grant for the Central Terrace project, which is located just south of this project. That staff report, without attachments, is included for reference.

Many Mansions, as the sole applicant, would receive all of the grant funds. The proposed terms of the implementation agreement between the City and Many Mansions are summarized below:

1. If awarded Grant funds, up to $5,233,000 thereof shall be transferred to the City for the purpose of constructing sustainable transportation infrastructure, transit-related amenities improvements and programs;

2. The City would be the lead agency to design and construct the Wooley Road Protected Bike Lane and Resurfacing Project, Downtown Oxnard Sidewalk Repairs, Oxnard Transit Center Improvements, and New Downtown Oxnard Bus Stops and Pedestrian Enhancements.

3. The will also be the lead agency to implement anti-displacement activities, through enhanced outreach in support of the City’s Rent Stabilization and Just Cause Tenant Protection Ordinances.

4. The City will submit to Many Mansions all cost invoices and draw requests for the transit funds that are associated with the proposed improvements;

5. The City will complete the proposed improvements and programs no later than the deadline required under the Affordable Housing and Sustainable Communities grant documents;

6. Many Mansions must receive final approval from the City of their AHSC application prior to submission;

7. The agreement will terminate upon the earlier of: the completion of all obligations under the Affordable Housing and Sustainable Communities requirements; or (ii) mutual agreement of both the City and Many Mansions; or (iii) the occurrence of an Event of Default;

8. The agreement will automatically terminate if Many Mansions does not receive an award of the Affordable Housing and Sustainable Communities funds to construct Aspire Apartments affordable housing development and grant funds for the City to construct sustainable transportation infrastructure and transit-related amenities improvements.

If grant funding is awarded in an amount less than requested, or if the final cost for design or construction increases at the time of bid and award, the City will be responsible for funding cost overages. However, if grant funding is awarded in an amount less than requested, the City will also have the discretion to reject the grant funds and its commitment to the sustainable transportation infrastructure and transit-related amenities improvement projects.

If the City accepts the grants funds, the City would have until August of 2029 to disburse all funds.

STRATEGIC PRIORITIES
This agenda item supports the Infrastructure and Natural Resources strategy. The purpose of the Infrastructure and Natural Resources strategy is to preserve and improve our roads, utilities, parks, trees, water supply and natural resources through effective planning, prioritization, and an equitable and efficient use of available funding.

This agenda item supports the Quality of Life strategy. The purpose of the Quality of Life strategy is to restore and increase quality services and programs that enrich Oxnard's diverse community, promotes safe neighborhoods, encourages community engagement, and supports our residents in their efforts to improve their quality of life. 1067

FINANCIAL IMPACT
There is $2,772,021 available in the City’s HOME ARP Program funding (Fund 202) to award a gap-financing loan of $1,200,000 to Many Mansions for the development of Aspire Apartments.

There is no immediate financial impact associated with the approval of the Affordable Housing and Sustainable Communities Program Implementation Agreement between the City and Many Mansions. However, the Affordable Housing and Sustainable Community Program grant funds are disbursed on a reimbursement basis. If Many Mansions is awarded Affordable Housing and Sustainable Communities grant funds, city staff may need to return to Council to identify the initial funding source and recognize appropriate funds for the City to complete the improvements and programs on a reimbursable basis.

For Finance Use Only: HOME Fund (Org. 2028105 Obj. 53600) Project G2410

COMMITTEE OUTCOME
The Affordable Housing and Sustainable Communities program application was released on January 19, 2024, which did not allow sufficient time for this item to be presented to Committee.

Prepared by: Emilio Ramirez, Housing Director

ATTACHMENTS

1. Preliminary Award Letter

2. Implementation Agreement

3. Central Terrace Staff Report

4. Presentation
1068
February 7, 2024
Many Mansions
Attn: Rick Schroeder
1259 E Thousand Oaks Blvd
Thousand Oaks, CA 91362
Re: Preliminary Award Letter regarding Financial Assistance by the City of Oxnard Aspire Apartments
Dear Mr. Schroeder:

This Preliminary Award Letter (“Preliminary Award”) sets forth the basic terms under which the City of Oxnard (“City”) is prepared to proceed to enter into an Affordable Housing Loan Agreement and ancillary loan documents for a loan in the amount of One Million Two Hundred Thousand Dollars ($1,200,000) in connection with the development of an approximate .77 acre site located at 536 – 538 Meta Street, Oxnard, CA (“Property”) with 88 units of affordable housing known as Aspire Apartments(“Project”). This Preliminary Award shall expire on December 31, 2025, at which time the terms set forth herein shall be null and void unless otherwise extended in the sole and absolute discretion of the City’s Housing Director.

You have informed the City that Aspire Apartments LP, a California limited partnership in which a wholly-controlled affiliate of Many Mansions, a California nonprofit public benefit corporation, (“Many Mansions”) is the general partner, acquired the Property on December 30, 2022, for the development of the Project. In connection with the acquisition of the Property and the construction of the Project, Many Mansions has requested that the City provide the Partnership with a permanent residual receipts loan with the following terms and conditions:

1. The principal amount of the loan shall not exceed $1,200,000.

2. The term of the loan shall be for 55 years.

3. The interest rate shall be 3% simple interest.

4. A Regulatory Agreement and Restrictive Covenant shall be recorded against the Property requiring that five units shall be designated as HOME ARP affordable units and rented to qualified low-income families.

5. The principal and interest shall be repaid from a share of residual receipts shared pro rata with other governmental residual receipt lenders.

6. Borrower shall comply with HOME ARP requirements, including the requirements specified in HOME ARP Notice 21-10.

The Preliminary Award is being provided for the express purpose of satisfying the requirements of the California Housing and Community Development Department’s (“HCD”) AHSC program and the California Tax Credit Allocation Committee (“TCAC”) Regulations implementing the Federal and State Low Income Housing Tax Credits. If Many Mansions receives an award of AHSC program funding and low-income housing tax credits (“Tax Credits”), then Many Mansions and the City may negotiate and enter into an Affordable Housing Loan Agreement and ancillary loan documents in implementation of the award of AHSC program funding and Tax Credits. 1069
The Oxnard City Council has reviewed Many Mansions’ request for a permanent loan on March 4, 2024, during a public meeting. The City Council authorized and approved issuance of this Preliminary Award in order to evidence the preliminary award of the permanent loan described herein.

If, however, the City loan is funded with HOME Program funds, by this Preliminary Award, City intends to make a preliminary award to the Developer pursuant to 24 CFR 92.504(c)(3) of the HOME Program, subject and pursuant to all applicable federal state and local laws and regulations.

City has made Many Mansions aware of the 2013 HOME Final Rule, specifically including the amendments to the definition of “commitment” in 24 CFR 92.2 that prohibits the City, as a recipient of HOME Program funds from providing a commitment (as the term is defined therein) of HOME Program funds to any specific local project until “the City and project owner have executed a written legally binding agreement under which HOME assistance will be provided to the owner for an identifiable project for which all necessary financing has been secured, a budget and schedule have been established, and underwriting has been completed and under which construction is scheduled to start within twelve months of the agreement date.” Notwithstanding the definition of “commitment” in 24 CFR 92.2 as amended by the 2013 Home Final Rule, 24 CFR 92.504(c)(3) authorizes the City to “preliminarily award HOME funds for a proposed project, contingent on conditions such as obtaining other financing for the project”; however, this section goes on to clearly confirm that “[t]his preliminary award is not a commitment to a project.

The written agreement committing the HOME funds to the Project must meet the requirements of ‘commitment to a specific local project’ in the definition of ‘commitment’ in §24 CFR 92.2”.

Thus, while as to the City loan (if to be sourced from HOME Program funds), this Preliminary Award is not, and shall not be construed as a “commitment” of HOME Program federal funds as defined under the HOME Program. City intends that this Preliminary Award Letter evidence the City’s preliminary award of the City loan expressly subject to the conditions set forth in this Preliminary Award.

Accordingly, City’s obligation to provide the City loan to Many Mansions for the Project is subject to and conditioned upon Many Mansions obtaining the necessary financing to complete the Project and entering into a binding Affordable Housing Loan Agreement and ancillary documents with the City as set out in this Preliminary Award.

Please feel free to contact the undersigned should you have any questions or wish to discuss this matter further.

Sincerely,
John C. Zaragoza,
Mayor
1070
Agreement No.# 32400430
1 of 8

AHSC IMPLEMENTATION AGREEMENT
THIS AHSC IMPLEMENTATION AND MUTUAL INDEMNITY AGREEMENT (the “Agreement”) is made and entered into as of March 4, 2024, between the City of Oxnard (“City”), and Many Mansions, a California Nonprofit Corporation, a California nonprofit public benefit corporation (“Developer”, and collectively with the City, the “Parties”, or individually, a “Party”), upon the basis of the following facts, understanding and intentions of the parties:

A. The State of California, the Strategic Growth Council (" SGC") and the Department of Housing and Community Development (" HCD") issued a Notice of Funding Availability (Round 8) dated January 19, 2024 (the “AHSC NOFA”), under the Affordable Housing and Sustainable Communities (“AHSC”) Program established under Division 44, Part 1 of the Public Resources Code, commencing with Section 75200.

B. Developer is applying for AHSC funds in response to the AHSC NOFA to provide funding for (A) construction of Aspire Apartments (“Aspire”), an 88-unit mixed use affordable housing project located at 536-538 Meta Street in the City of Oxnard ( the “Housing Project”); ( B) the construction of certain housing related infrastructure (the “HRI Improvements”); ( C) the construction of certain sustainable transportation infrastructure (the “STI Improvements”); ( D) the construction of certain transit related amenities (the “TRA Improvements”); and (E) certain costs related to educational programs (the “Programs”). These improvements will be described in more detail in the Final Application to be submitted by March 19, 2024 (collectively, the “AHSC Application”).

C. The AHSC Application seeks an award to the Developer in an aggregate amount not to exceed $50,000,000 in AHSC funds including a loan (the “AHSC Loan”) not to exceed $35,000,000 for an Affordable Housing Development (AHD) and a grant (the “AHSC Grant”) in an amount not to exceed $15,000,000 for Housing -Related Infrastructure (HRI), Sustainable Transportation Infrastructure (STI), Transit -Related Amenities (TRA) or Programs (PGMs) activities as defined the AHSC Program Guidelines adopted by SGC on December 14, 2023.

The AHSC Grant funds will be disbursed to the Developer. If awarded AHSC Grant funds, up to $5,233,000 thereof (or the amount awarded by the AHSC Grant for City to design, construct or implement STI, TRA Improvements and PGM Activities) shall be transferred to the City for the purpose of constructing STI and TRA Improvements and implementing PGM Activities.

The City will be the lead agency to design and construct the following projects: Wooley Road Protected Bike Lanes as part of the Arterial Streets Resurfacing project; Citywide (Downtown) Sidewalk Repairs; Oxnard Transit Center Improvements, and New Downtown Bus Stops with Pedestrian Enhancements. The City will also implement anti-displacement activities that are categorized as PGMs. The City will utilize $150,000 of the AHSC Grant to support the City of Oxnard’s Rent Stabilization and Tenant Protection Program, through enhanced outreach, operation of rental registry database and staff support. These improvements and programs will collectively be referred to as “City AHSC Obligations”. These improvements and programs will be described in more detail in the AHSC Application to be submitted by March 19, 2024.

D. The City and Developer are required to enter into this Agreement in order to comply with the specific AHSC Program Threshold Requirement stated in Section 106 (b) 7 (C) of the 2023 AHSC Program Guidelines dated December 14, 2023 (the “Locality Prior Experience Threshold Requirement”). This section of the guidelines dictates that applicants must demonstrate prior experience by providing evidence of at least two prior projects that are similar to the proposed AHSC project in scope and size, which have been completed by the applicant, or joint applicant, during the ten (10) years preceding the application due date. This section of the guidelines also states that the applicants may demonstrate the requisite experience by using the past experience of work completed of a non-applicant so long as the 1071
Agreement No.# 32400430
2 of 8
applicants can provide an executed agreement with that specific non-applicant for the completion of the related work in the AHSC Application for which funding is sought. The purpose of this Agreement is to, amongst other things, comply with the Locality Prior Experience Threshold Requirement. Locality completed prior experience projects in both STI and TRA are as follows:
a. STI:

Project Name: Flashing Pedestrian Beacons
Development Entity: City of Oxnard
Completion Date: April 17, 2020
Brief Description: Design and construction of pedestrian enhancements at 14 locations throughout the City of Oxnard, including installation of flashing pedestrian beacons, American with Disabilities Act improvements to sidewalk curb ramps, high visibility crosswalks, signage, and striping.
b. STI:

Project Name: Vineyard Avenue Resurfacing
Development Entity: City of Oxnard
Completion Date: September 14, 2019
Brief Description: Design and construction of roadway resurfacing including Class II bike lanes, American with Disabilities Act improvements to sidewalk curb ramps, high visibility crosswalks, signage, and striping.
c. TRA:

Project Name: Ventura Road Route Bus Stops
Development Entity: City of Oxnard
Completion Date: March 25, 2020
Brief Description: In partnership with Gold Coast Transit and Ventura County Transportation Commission, City design and constructed a new transit line along a six and one-half mile length of Ventura Road, Hueneme Road, and Saviers Road.

New bus stops were installed including pedestrian and American with Disabilities Act improvements to sidewalk curb ramps, bus pullout areas, poles and signage. d. TRA:

Project Name: Victoria Avenue Improvements and Bus Stop Development Entity: City of Oxnard
Completion Date: September 11, 2014
Brief Description: Sidewalk and bike lane installation, drainage improvements, roadway improvements to medians, and bus stop pad improvements, including American with Disabilities Act improvements to sidewalk curb ramps, poles and signage.

E. The City is a non-applicant, but, as set forth herein, shall implement the City AHSC Obligations as described in Recital C of this Agreement.

F. The Developer shall be responsible for constructing and developing the Housing Project, and certain HRI Improvements, (together, the “Developer Obligations"), and for all costs and expenses related thereto and the City shall be responsible for developing, constructing and implementing the City AHSC Obligations. In connection with the AHSC Grant and AHSC Loan, Developer is required to enter into standard agreements, disbursement agreements, and regulatory agreements with HCD where Developer will be liable for the full and timely performance by the parties to complete the obligations set forth therein, including completion 1072
Agreement No.# 32400430
3 of 8
of the Housing Project, and funding of the AHSC Programs, as described in the AHSC Application. The AHSC Application and all standard agreements, disbursement agreements, regulatory agreements and any other agreements required by HCD in connection with the AHSC Grant and AHSC Loan shall be collectively referred to herein as the “AHSC Documents”.

NOW, THEREFORE, in consideration of the recitals, covenants and agreements set forth herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties hereto hereby agree as follows:

AGREEMENT

1. OBLIGATIONS. The City shall complete the City AHSC Obligations in accordance with the terms of the AHSC Documents and the approved design and construction documents. The Developer shall, in its sole responsibility, complete the Developer Obligations in accordance with the terms of the AHSC Documents and the approved design and construction documents.

Developer agrees not to submit the AHSC Application without the City’s final approval. Once submitted by AHSC, the AHSC Application shall become attached hereto and incorporated herein by this reference. Further, in the event that the application does not receive sufficient funds to where the City’s request is unfulfilled, the parties shall negotiate further whether to accept partial funds or not. In the event that a mutual agreement is not achieved, the City may reject the AHSC grant funds and shall not be obligated to complete the STI and/or TRA projects and/or PGM activities, as identified in Section C of this Agreement.

2. Indemnification.
a. City Indemnity. City shall indemnify, defend, protect, and hold harmless the Developer and its affiliates, directors, officers, partners, members, agents, and employees (each, a “Developer Indemnified Party”) against any and all third -party suits, actions, claims, causes of action, liabilities, costs, and expenses ( including attorneys' fees) as incurred (collectively “Damages”) arising out of or in connection with City’s performance of or failure to perform the Sustainable Transit Obligations and/ or obligations hereunder, in the manner and within the time periods, and to otherwise perform any covenants, set forth in the AHSC Documents applicable to the Sustainable Transit Obligations or its obligations hereunder. However, in no event shall a Developer Indemnified Party be indemnified hereunder for any Damages resulting from such party' s sole negligence or willful misconduct. City agrees to pay all of the costs and expenses of the Developer Indemnified Parties, including attorneys' fees, which may be incurred in any effort to enforce any term of this Agreement, including, but not limited to, all such costs and expenses which may be incurred by any Developer Indemnified Party in any legal action, reference or arbitration proceeding brought by HCD or other third party.
b. Developer Indemnity. Developer shall indemnify, defend, protect, and hold harmless the City and its affiliates, directors, officers, partners, members, agents and employees (each, a “City Indemnified Party”) against any and all Damages arising out of or in connection with Developer' s performance of or failure to perform its Developer Obligations to complete construction and development of the Housing Development, in the manner and within the time periods, and to otherwise perform any covenants, set forth in the AHSC Documents. However, in no event shall the City Indemnified Party be indemnified hereunder for any Claims resulting from such party' s sole negligence or willful misconduct. Developer agrees to pay all of the costs and expenses of the City Indemnified Party, including attorneys' fees, which may be incurred in any effort to enforce any term of this Agreement, including, but not limited to, all such costs and expenses which 1073
Agreement No.# 32400430
4 of 8
may be incurred by any City Indemnified Party in any legal action, reference or arbitration proceeding brought by HCD or other third party. Notwithstanding the generality of the foregoing, neither party is liable to the other party (including any person or entity claiming through the other party) for the other party' s lost profits or special, incidental, indirect, consequential, or exemplary damages arising out of or in any manner connected with this agreement or its subject matter, regardless of the form of action and whether or not the non -claiming party has been informed of, or otherwise might have anticipated, the possibility of damages. However, the limitations of liability set forth in this section 2(c) or elsewhere in this agreement do not apply to, or consider, damages: (i) resulting from the gross negligence, bad faith, or the willful or intentional misconduct of a party or its personnel; or (ii) stemming from personal injury, death, or property damage caused by a party or its personnel.

2. Schedule of Performance; Progress Reports. The City shall comply with the schedule of performance set forth on Exhibit 1 attached hereto for the completion of the City AHSC Obligations hereunder (the “Schedule of Performance”).

3. Cost Overruns. Developer shall be responsible for paying all costs required to complete the Housing Project, irrespective of whether such costs exceed the AHSC Loan and the portion of the AHSC Grant designated for the HRI Improvements. City shall be responsible for paying all costs required for the City AHSC Obligations irrespective of whether such costs exceed the portion of the AHSC Grant designated for the City AHSC Obligations.

4. Disbursement of AHSC Grant Funds. Developer and City agree that the AHSC Grant funds shall be disbursed directly to the Developer. The AHSC Loan may be assigned and disbursed to a limited partnership in which the Developer or its affiliate is the managing general partner.

As part of City’s implementation of the proposed improvements and programs identified as City AHSC Obligations in Recital C of this Agreement, City shall submit to Developer all cost invoices and draw requests associated with such proposed improvements and programs and, promptly following receipt, Developer shall submit such requests to HCD for City’s reimbursement. Promptly following receipt of the requested funds, Developer will deliver those funds to the City which shall exercise due diligence and complete the proposed improvements and programs identified as City AHSC Obligations no later than the deadline required under the HCD AHSC grant documents. If HCD allows, City invoices will be submitted directly to HCD, so that reimbursement can be made directly to City, and City will share and deliver to Developer true, correct and complete copies of all invoice submittals and draw requests to HCD.

5. Notices. Formal notices, demands, and communications between the parties shall be sufficiently given if, and shall not be deemed given unless, dispatched by registered or certified mail, postage prepaid, return receipt requested, or delivered by express delivery service, return receipt requested, or delivered personally, to the principal office of the parties as follows:

City:

Albert Ramirez, Assistant Director
City of Oxnard
305 W Third Street,
Oxnard, CA 93030
Developer:

Doug Menges, Executive Director
1074
Agreement No.# 32400430
5 of 8
Many Mansions
1259 E Thousand Oaks Blvd.,
Thousand Oaks, CA 91360

7. Events of Default. The occurrence of any of the following events shall constitute an “Event of Default” under this Agreement:
a. A Party fails to perform any of its obligations under this Agreement, and does not cure such failure within 30 days after written notice of such failure has been delivered to the defaulting party; or
b. A Party purports to revoke this Agreement or this Agreement becomes ineffective for any reason (other than by virtue of the application of clauses (i) or (ii) of Section 8).

8. Termination. This Agreement shall terminate upon the earlier of: (i) completion of all obligations under the AHSC Documents; or (ii) mutual agreement of the parties hereto; or (iii) the occurrence of an Event of Default.

9. Third Party Beneficiary. The Partnership shall be a third-party beneficiary of this Agreement and shall be entitled to the rights and benefits hereunder and may enforce the provisions hereof as if it were a party to this Agreement.

10. Miscellaneous.
a. Nothing in this Agreement shall be construed to limit any claim or right which any party may otherwise have at any time against an indemnifying Party under Section 2 or any other person arising from any source other than this Agreement, including any claim for fraud, misrepresentation, waste, or breach of contract other than this Agreement, and any rights of contribution or indemnity under any federal or state environmental law or any other applicable law, regulation, or ordinance.
b. If any party delays in exercising or fails to exercise any right or remedy against a Party, that alone shall not be construed as a waiver of such right or remedy. All remedies of any Party against the other Party are cumulative.
c. This Agreement shall be binding upon and inure to the benefit of each of the parties hereto and their respective representatives, heirs, executor, administrators, successors, and assigns. This Agreement may not be amended except by a written instrument executed by the parties hereto.
d. This Agreement shall be deemed to have been delivered and accepted in the State of California and governed exclusively by the internal substantive laws of the State of California as the same may exist at the date hereof. The parties hereto hereby agree that any action hereon between the parties hereto and their successors in interest may be maintained in a court of competent jurisdiction located in the State of California, and consent to the jurisdiction of any such California court for the purposes connected herewith.
e. Each party hereto intends that this Agreement shall not benefit or create any right or cause of action in or on behalf of any person other than the parties hereto and the Partnership.
f. This Agreement may be executed in multiple counterpart copies, any one of which when duly executed, with all formalities hereof, shall be fully binding and effective as the original of this Agreement.
1075
Agreement No.# 32400430
6 of 8
g. This Agreement shall be effective as of the date first written above, provided however that in the event that the Developer does not receive an award of the AHSC Loan and AHSC Grant, this Agreement shall automatically terminate and be of no further force or effect.
h. The provisions of this Agreement that, by their nature and content, must survive the completion, rescission, termination, or expiration of this Agreement in order to achieve the fundamental purposes of this Agreement will so survive and continue to bind the Parties. Without limiting the generality of the foregoing, the Parties specifically acknowledge that the provisions of Section 2 will survive and continue to bind the Parties.

Each of the undersigned hereby executes this Agreement in the spaces provided below to evidence their respective agreement to the terms of this Agreement.

City of Oxnard:

By: __________________________________
Name: John C. Zaragoza
Its: Mayor
ATTEST:

By: __________________________________
Name: Rose Chaparro
Its: City Clerk
APPROVED AS TO FORM:

By: __________________________________
Name: Stephen M. Fischer
Its: City Attorney
Developer
Many Mansions, a California nonprofit public benefit corporation By: __________________________________
Name: Rick Schroeder
Its: President
By: __________________________________
Name: Susan Cass
Its: Secretary
1076
Agreement No.# 32400430
7 of 8
EXHIBIT 1
Schedule of Performance
Exhibit 1: Schedule of Performance
Note: It is acknowledged that some of the following milestones may have already been achieved. For those milestones which have previously been met, the month and year completed has been provided. For those milestones not yet completed, a projected completion date (MM/YY) for each of the applicable items is provided below.

STI MILESTONES
STI Capital Project Milestone Schedule Estimated
Date*
Executed binding agreement between the Recipient and developer of the proposed development detailing the terms and conditions of the Project development. Completed Site control of sites(s) by proposed developer. Completed Completed all necessary environmental clearances, including those required under CEQA and NEPA.
6/25
Submission of final construction drawings and specifications to the appropriate local permitting authority.
2/27
Commencement of construction. 9/27
Construction completion and closeout. 12/28
Program funds fully disbursed. 6/29

TRA MILESTONES
TRA Capital Project Milestone Schedule Estimated
Date*
Executed binding agreement between the Recipient and developer of the proposed development detailing the terms and conditions of the Project development. Completed Site Control of sites(s) by proposed developer. Completed Completed all necessary environmental clearances, including those required under CEQA and NEPA. 6/25
Submission of final construction drawings and specifications to the appropriate local permitting authority.
2/27
Commencement of construction. 9/27
Construction completion and closeout. 12/28
Program funds fully disbursed. 6/29

PGM MILESTONES
PGM Program Milestone Schedule Estimated
Date*
Identification and commitment of Program Operators and Partners 12/24 Completion of a work plan 3/25
Program funds fully disbursed 3/27
*Subject to change after award of AHSC funds. Schedule to be finalized with City, HCD and Developer. 1077

CITY COUNCIL AGENDA REPORT

REPORTS
AGENDA ITEM NO. N.2
DATE: June 1, 2021
TO: City Council
FROM: Emilio Ramirez, Housing Director, (805) 385-8094, [email protected] SUBJECT: Central Terrace Apartments - In-Lieu Loan Agreement and Affordable Housing and Sustainable Communities Program (AHSC) Implementation Agreement. (0/10/5)

RECOMMENDATION
That the City Council:

1. Authorize the Mayor to execute an Affordable Housing In-Lieu Loan Agreement and Regulatory Agreement with Many Mansions, a non-profit affordable housing provider, providing gap financing in the amount of $1,250,000 for the construction of eighty-six (86) affordable rental units and one (1) unrestricted manager’s unit commonly known as the Central Terrace Apartments located at 217- 235 East 6th Street, Oxnard, CA 93030;

2. Approve a budget appropriation of $1,250,000 from the Oxnard Housing In-Lieu Fees Fund;

3. Authorize the City Manager or designee to make necessary corrections or modifications to the In-Lieu Loan Agreement, Regulatory Agreement, Deed of Trust, or Promissory Note in order in order to make them consistent with each other; and

4. Authorize the Mayor to execute an Implementation Agreement with Many Mansions to receive pass-through grant funding associated with Central Terrace Apartments’ Affordable Housing and Sustainable Communities Program application.
(This item did not originate in the Committee due to a pending Appeal, which has since been withdrawn, at the time this agenda item was scheduled to be published for the May 11, 2021 Community Services, Public Safety, Housing and Development Committee meeting.)
Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/22dmJZvDPSc

BACKGROUND
Many Mansions is a non-profit housing organization that works to provide affordable housing to households with verylow and low-incomes by constructing new or acquiring and rehabilitating existing housing units, in partnership with Cities and other local organizations. Since its founding over forty years ago, Many Mansions has acquired and managed over 600 units of affordable housing at twenty properties throughout Ventura County. Many Mansions is also a service provider offering adult, children, and family services.

Many Mansions purchased the approximately half-acre site located at 217- 235 East 6th Street, in downtown Oxnard, in 1078
February 2020. The Central Terrace Apartments development will provide multi-family affordable rental housing units that will include eighty-six (86) affordable one-bedroom units, plus one (1) two-bedroom unrestricted manager’s unit.

Thirty-five (35) One-Bedroom Units will be provided for households at or below thirty-percent of the area median income. These units will be permanent supportive housing units and will be made available to house homeless individuals and families. Twenty (20) Units will be provided at fifty-percent of the area median income, and thirty-one (31) units will be provided for households at or below sixty-percent of the area median income. The current California Department of Housing and Community Development state income limit for a household earning up to thirty percent of the area median income in a one-bedroom unit is up to $27,100; for a household earning up to fifty percent of the area median income in a one-bedroom unit up to $45,200; and for a household earning up to sixty percent of the area median income in a one-bedroom unit is up to $47,430. Additional affordability restrictions on the project are described in the Financing Plan, Development Schedule, and Loan Agreement section of the report.

The project will include four stories of residential units above a podium (concrete first floor) with an elevator, the ground floor will include approximately 2,375 of common space, office space, restrooms, and a kitchenette. Once construction of the development has been completed, Many Mansions will provide life enriching services free of charge on an ongoing basis, on site, for the residents including transportation coordination, case management services, and access to community and government resources.

Many Mansions received approval of a Major Downtown Design Development Review Permit at the Community Development Director Hearing held on April 21, 2021 and is scheduled to go to the Planning Commission on May 20, 2021 for consideration of a Density Bonus Permit in order to receive three development concessions.

In-Lieu Fees
In-Lieu fees are collected by the City from Developers who receive City Council approval to pay fees in-lieu of building the required minimum ten percent of affordable housing units in their projects, as required by the City’s Inclusionary Housing Ordinance for rental or for-sale products in projects with ten or more units. These In-Lieu fees are used to create affordable housing opportunities in the City by providing loans to developers for the construction of new affordable housing within the City of Oxnard. Many Mansions submitted a funding application to the City to support a financial gap of $1,250,000, with the use of the City’s affordable housing in-lieu fee funds for the construction of the Central Terrace Apartments.

Affordable Housing and Sustainable Communities Program
Many Mansions’ financing plan for the Central Terrace Apartments also involves submission of an application to the Affordable Housing and Sustainable Communities Program, which is administered by the Strategic Growth Council, a body under the California Department of Housing and Community Development. The Affordable Housing and Sustainable Communities Program funds land-use, housing, transportation, and land preservation projects to support infill and compact development that reduce greenhouse gas emissions. Funding for the Affordable Housing and Sustainable Communities Program is provided from the Greenhouse Gas Reduction Fund, an account established to receive Cap-andTrade auction proceeds. The Affordable Housing and Sustainable Communities Program provides grants and/or loans, or any combination thereof, to achieve greenhouse gas emissions reductions through increasing accessibility of affordable housing, employment centers, and key destinations via low-carbon transportation resulting in fewer vehicle miles traveled through shortened or reduced trip length or mode shift from single occupancy vehicle use to transit, bicycling, or walking.

The Affordable Housing and Sustainable Communities program can fund up to $20 Million in loan funds for construction of affordable housing developments which can then be leveraged with other funding sources. The Affordable Housing and Sustainable Communities Program can also fund up to $10 million in grant funds under the same application for Housing Related Infrastructure, Sustainable Transportation Infrastructure, Transit-Related Amenities, or Program Activities.

As such, the City has also been asked by Many Mansions to assist in their Affordable Housing and Sustainable Communities Program application for their Central Terrace Apartments project so that the City may receive grant 1079
funding to complete City planned sustainable transportation infrastructure and transit-related amenities related improvements in downtown in areas adjacent to and in close proximity to the project site.

The Sustainable Transportation Infrastructure, Transit-Related Amenities Notice of Funding availability was issued on February 26, 2021 and the deadline to submit the application is on June 8, 2021. This June 8th deadline is also part of the reason that staff could not take this item to the Committee once the Appeal was withdrawn on May 18, 2021.

DISCUSSION
The total cost for construction of the Central Terrace Apartments is $44,821,109. Once the 86-unit project is placed in service, through a separate action, Many Mansions will request thirty-five project-based vouchers from the Oxnard Housing Authority. As part of the project-based voucher proposal, supportive services, as described in this report, will be provided on-site in accordance with the Oxnard Housing Authority’s Administrative Plan.

Financing Plan, Development Schedule, and Loan Agreement An assessment of Many Mansions’ proforma and company background was conducted by the City in which it was determined that the requested $1,250,000 funding equates to less than three percent of the total estimated project costs.

Many Mansions is a successful builder and manager of affordable housing throughout Ventura County and has several thriving rental projects, along with the capacity through their staffing to undertake and complete this project.

Many Mansion’s proposed permanent funding sources for the project are as follows:

City of Oxnard In-Lieu Fee Loan (City Funding): $1,250,000 MUFG Union Bank, N.A (Private Funding): $6,835,000
Affordable Housing and Sustainable Communities Loan (State Funding) : $15,219,821 Federal Home Land Bank Of San Francisco (FHLBSF) AHP (Federal Funding): $870,000 General Partner Equity (Private Funding): $100
Deferred Developer (Private Funding): $1,554,300
Tax Credit Equity (Federal Funding): $19,091,888.

If Many Mansions is able to secure all of the private and public funding listed above in their first attempt, then Many Mansions would begin construction in June 2022 and complete construction in Spring 2024.

The City’s Affordable Housing In-Lieu Loan Agreement for a gap-financing loan of $1,250,000, will require the Central Terrace Apartments development to provide eight (8) one-bedroom permanent supportive housing units for homeless households with annual incomes at or below fifty-percent of the area median income. All eight units will carry a fiftyfive-year affordability restriction which will match the term of the Affordable Housing In-Lieu Loan Agreement. The density bonus permit that the Central Terrace Apartments is requesting as part of their land use application with the City also carries a fifty-five-year restriction on an additional fourteen (14) units. Those 14 units must be made available for rent to households with annual incomes at or below fifty percent of the area median income. The current California Department of Housing and Community Development state income limit for a one-person household earning up to fifty percent of the area median income is $39,950 and goes up to $45,200 for a two-person household in Ventura County.

The restrictions will be enforced via a recorded regulatory agreement executed between Many Mansions and City for the In-Lieu units and a separate density bonus agreement for the density bonus units between the City and Many Mansions to 1080
ensure that the units remain affordable and are provided to eligible income qualified tenants.

The eight (8) in-lieu units will require financial reporting and analysis annually to comply with In-Lieu loan requirements. Monitoring fees for the fifty-five-year term are included in the Developer’s budget so that the City is able to recover the cost of the monitoring.

The loan agreement between the City and Many Mansions would be inclusive of a promissory note, deed of trust, and regulatory agreement. Other loan terms associated with the City’s Affordable Housing In-Lieu loan are summarized below:

1. Three percent simple interest; and

2. Repayment of the City Loan will be on a residual receipts basis to be paid after all operating expenses, reserves, debt service with mandatory payments, investor management fee, deferred developer fee, and partnership management fee, with fifty percent of the residual receipts split pro-rata among all soft lenders based on the original principal amount of each soft lender loan; and

3. Many Mansions is required to secure all project financing and close on their construction loan by May 2025, or sooner.

If Many Mansions does not meet this timeline, the agreement is automatically terminated. If Many Mansions is able to meet this timeline, then the term of the agreement is fifty-five years from the date Many Mansions closes on their permanent financing.

Affordable Housing and Sustainable Communities Program Participation City Staff has coordinated with Many Mansions and the Ventura County Transportation Commission to identify bicycle, pedestrian, and transit projects that can qualify for the Affordable Housing and Sustainable Communities grant component. Staff recommends that the City solicit grant funds for sustainable transportation infrastructure and transitrelated amenities related improvements for the City’s Fourth Street Mobility Improvement Project, which is included in the City’s 2021-2026 Capital Improvement Program, and for design and installation of Downtown Oxnard Transit Amenities. The Fourth Street Mobility Improvement Project extends from C Street east to the Oxnard Transit Center (at 4th and Meta Streets), south along Meta Street to 6th Street. The project includes the design and construction of sidewalks, curb extensions, disability improvements, traffic signal modifications, bike detection, class II on-street bike lanes, bike racks, benches, B Street transit hub improvements, resurfacing, drainage improvements, signage, striping, and a new restroom. The Fourth Street Mobility Improvement Project is included in the City’s 2021-2026 Capital Improvement Program (CIP).

The City is working with the Gold Coast Transit District to develop the Downtown Oxnard Transit Amenities project to coordinate the design and installation of bus shelters, benches, bike racks, lighting, and real-time arrival signs at fifty-four transit stops in Downtown Oxnard. The project will be included in the City’s 2022-2027 CIP. The combined cost of both projects is estimated to be $5,409,200 and would be carried out by the City’s Public Works Division and be subject to an implementation agreement between the City and Many Mansions, which is further discussed in this report.

Many Mansions’ application for the Affordable Housing and Sustainable Communities Program will also request that a portion of the grant funds be used for Ventura County Transportation Commission vehicle acquisition. Ventura County Transportation Commission will be the lead agency for the Ventura County Transportation Commission vehicle acquisition, with a not to exceed estimate of $2.25 million. These Affordable Housing and Sustainable Communities grant funds would be subject to a separate implementation agreement between Ventura County Transportation Commission and Many Mansions.

The final cost estimate for each sustainable transportation infrastructure and transit-related amenities project will be included in the final grant application, which will become part of the final agreement. 1081
Implementation Agreement between Many Mansions and the City The City and Many Mansions are required to enter into an implementation agreement in order to comply with the Affordable Housing and Sustainable Communities program’s experience requirement. Staff recommends that the City execute a separate agreement with Many Mansions for the completion of the sustainable transportation infrastructure or transit-related amenities components included in the Affordable Housing and Sustainable Communities application.

Many Mansions, as the sole applicant, would receive all of the grant funds. The proposed terms of the implementation agreement between the City and Many Mansions are summarized below:

1. If awarded Grant funds, up to $5,409,200 thereof shall be transferred to the City for the purpose of constructing sustainable transportation infrastructure and transit-related amenities improvements;

2. The City would be the lead agency to design and construct the Fourth Street Mobility Improvement Project and Downtown Oxnard Transit Amenities projects;

3. The City will submit to Many Mansions all cost invoices and draw requests for the transit funds that are associated with the proposed improvements;

4. The City will complete the proposed improvements no later than the deadline required under the Affordable Housing and Sustainable Communities grant documents;

5. Many Mansions must receive final approval from the City of their Affordable Housing and Sustainable Communities application prior to submission;

6. The agreement will terminate upon the earlier of: the completion of all obligations under the Affordable Housing and Sustainable Communities requirements; or (ii) mutual agreement of both the City and Many Mansions; or (iii) the occurrence of an Event of Default;

7. The agreement will automatically terminate if Many Mansions does not receive an award of the Affordable Housing and Sustainable Communities funds to construct the Central Terrace Apartments affordable housing development and grant funds for the City to construct sustainable transportation infrastructure and transit-related amenities improvements.

If grant funding is awarded in an amount less than requested, or if the final cost for design or construction increases at the time of bid and award, the City will be responsible for funding cost overages. However, if grant funding is awarded in an amount less than requested, the City will also have the discretion to reject the grant funds and its commitment to the sustainable transportation infrastructure and transit-related amenities improvement projects.

If the City accepts the grants funds, the City would begin construction of the sustainable transportation infrastructure and transit-related amenities improvements by Summer 2024 and would complete construction by January 2025. Final disbursement of all funds would occur by June 2025.

STRATEGIC PRIORITIES
This agenda item supports the Infrastructure and Natural Resources strategy. The purpose of the Infrastructure and Natural Resources strategy is to preserve and improve our roads, utilities, parks, trees, water supply and natural resources through effective planning, prioritization, and an equitable and efficient use of available funding.

This agenda item supports the Quality of Life strategy. The purpose of the Quality of Life strategy is to restore and increase quality services and programs that enrich Oxnard's diverse community, promotes safe neighborhoods, encourages community engagement, and supports our residents in their efforts to improve their quality of life.

FINANCIAL IMPACT
1082
Approval of the recommended actions will:

Authorize an appropriation of $1,250,000 of the City’s Affordable Housing In-Lieu funds to award a gap-financing loan to Many Mansions for the development of the Central Terrace Apartments into the following account: 371-5135-804- 8364 (Housing Assist Loan). The current fund balance in the In-Lieu fund is: $ 3,149,296.

There is no immediate financial impact to the approval of the Affordable Housing and Sustainable Communities Program Implementation Agreement between the City and Many Mansions. However, the Affordable Housing and Sustainable Community Program grant funds are disbursed on a reimbursement basis. If Many Mansions is awarded Affordable Housing and Sustainable Communities grant funds, Public Works staff will return to Council to identify the initial funding source and recognize appropriate funds for the City to complete the Fourth Street Mobility Improvement Project and Downtown Oxnard Transit Amenities improvements on a reimbursable basis.

COMMITTEE OUTCOME
This item did not originate in the Committee. The item was originally scheduled for the May 11, 2021 Community Services, Public Safety, Housing and Development Committee meeting. However an appeal was filed on May 3, 2021 regarding the approval of the Major Downtown Design Review Permit issued at the Community Development Director’s Hearing held on April 21, 2021. However, this appeal has subsequently been withdrawn by the appealing party and the Major Design Review Permit for the Central Terrace Apartments remains valid and in effect. The appeal also delayed the Planning Commission’s consideration of the density bonus application associated with the project. At the time this agenda was printed, the Planning Commission consideration of the permit had not yet occurred. It will be considered on May 20, 2021.

The Affordable Housing and Sustainable Communities program application submission deadline is June 8, 2021. An executed Implementation Agreement between the City and Many Mansions is required in order to comply with the Affordable Housing and Sustainable Communities program’s experience requirement. Due to the project appeal, which was withdrawn on May 18th, staff did not have sufficient time to take this item to a committee meeting and still meet the June 8th grant deadline.

Prepared by: Emilio Ramirez, Housing Director

ATTACHMENTS

1. Attachement 1 - Affordable Housing Loan Agreement

2. Implementation Agreement

3. MM In-Lieu Loan & AHSC Implementation Agreement REVISED 5.12.21 Draft PPT V4

4. Budget Appropriation
1083

ASPIRE APARTMENTS

PRELIMINARY FUNDING & IMPLEMNTATION AGREEMENT

FOR A HOUSING AND SUSTAINABLE COMMUNITIES

PROGRAM GRANT APPLICATION

EMILIO RAMIREZ, DIRECTOR

HOUSING DEPARTMENT

CITY COUNCIL
MARCH 4, 2024
1084

MANY MANSIONS
2 1085

CENTRAL TERRACE
3 Many Mansions is also the developer of Central Terrace, which is located at 27-17-235 East 6th Street in Downtown Oxnard. The project includes eighty-six (86) affordable rental units, with thirty-five (35) of the units set-aside for homeless individuals. The project is currently under construction and opening in May of 2024. The project was awarded a Affordable Housing & Sustainable Communities (AHSC) Program Grant. 1086
4 ASPIRE APARTMENTS
1087
5 HOME-ARP

1. On September 20, 2021, the U.S. Department of Housing and Urban Development (HUD) awarded the City of Oxnard $2,772,021 in HOME American Rescue Plan (HOME-ARP) funding. HOME-ARP is a new funding source from the Federal government for local and state governments to address homelessness and affordable housing needs, streamlined through the HOME (HOME) Investment Partnership program.

2. From December of 2022 through February 2023, Housing Staff completed substantial community outreach to solicit feedback on how best to prioritize the use of the HOME-ARP funding. The overwhelmingly feedback received was to prioritize the creation of new permanent supportive housing.

3. On March 21, 2023, City Council approved the City’s HOME-ARP Allocation Plan, which directed staff to utilize its HOME-ARP program funding to support the creation of new permanent supportive housing. 1088
6 AHSC PROGRAM
1089
7 FINANCING PLAN, SCHEDULE AND AWARD LETTER

1. While a majority of the funding needed to complete the Project is projected to come from Federal and State Resources, assistance is needed from the City to close the remaining financial gap. To address the gap, the Housing Department requests awarding $1,200,000 in HOME-ARP to Many Mansions’ to support Aspire Apartments.

Funding Source Amount
City of Oxnard HOME-ARP Loan (public – city) $1,200,000 Accrued Deferred Interest – City HOME-ARP Loan (public – city) $51,076 Permanent Loan (private) $3,072,000
Affordable Housing and Sustainable Communities Loan (public – State) $25,000,000 Developer Equity (private) $100
Deferred Developer Fee (private) $4,249,656
Tax Credit Equity (public – State) $24,215,345
Total Development Cost $57,788,177

2. If Many Mansions is able to secure all of the private and public funding listed above in their first attempt, then Many Mansions would begin construction in June 2025 and complete construction in December of 2026.

3. By providing this amount in HOME-ARP, Aspire Apartments must provide five (5) one-bedroom permanent supportive housing units for homeless households with annual incomes at or below thirty-percent (30%) of the area median income. All five (5) units will carry a twenty-year (20) affordability restriction. 1090
8 AHSC PARTICPATION

1. City Staff has coordinated with
Many Mansions, Gold Coast
Transit District and various
community partners to identify
eligible high impact sustainable
transportation improvements,
transit related amenities and
community serving programs.

2. Listed in the table are the
eligible projects that have been
identified and will be included
in Many Mansions’ AHSC
Application.

Project Description Responsible Entity Funding
Request
Aspire Affordable Rental Housing Development and
Infrastructure
Many Mansions $25,000,000
Wooley Road Resurfacing and Protected Bike Lane
Improvements
City of Oxnard Public
Works
$5,083,000
Oxnard Transit Center Improvements
Downtown Oxnard Sidewalk Repairs
New Downtown Bus Stops with Pedestrian
Enhancements
Purchase forty-two (42) new electric vans to support
County vanpool program
California Vanpool
Authority
$3,780,000
Workplace Literacy Program for Immigrants and
Refugees Program.

Economic Development
Collaborative
$70,000
Outreach for Building Trades Pre-Apprenticeship
Program.

Tri-Counties Building
and Construction Trades
Council
$40,000
Tenant legal counseling to Oxnard residents. The Law Offices of Barbara Macri-Ortiz
$340,000
Community outreach to support the City of Oxnard’s
Rent Stabilization and Just Cause Ordinances
City of Oxnard -
Housing Department
$150,000
Construct a volunteer nursery and educational space at
the vacant lot located at the southwest corner of 6th and C Street.

Mini Nature Reserve $137,000
1091
9 IMPLEMENTATION AGREEMENT

1. Staff recommends that the City execute an Implementation Agreement with Many Mansions for the completion of the City led sustainable transportation infrastructure, transit-related amenities and programs described in the previous table.

2. Many Mansions, as the sole applicant, would receive all of the grant funds.

3. If awarded Grant funds, up to $5,233,000 thereof shall be transferred to the City.

4. The agreement will automatically terminate if Many Mansions does not receive an award.

5. If grant funding is awarded in an amount less than requested, or if the final cost for design or construction increases at the time of bid and award, the City will be responsible for funding cost overages.

6. However, if grant funding is awarded in an amount less than requested, the City will also have the discretion to reject the grant funds and its commitment to the sustainable transportation infrastructure and transit-related amenities improvement projects.

7. If the City accepts the grants funds, the City would have until August of 2029 to disburse all funds. 1092
10 FINANCIAL IMPACT

1. Approval of the recommended actions will Authorize an appropriation of $1,200,000 from the City’s HOME ARP Program funding to award a gap-financing loan to Many Mansions for the development of Aspire Apartments.

The current fund balance in the HOME-ARP Fund is $2,772,021.

2. There is no immediate financial impact to the approval of the AHSC Implementation Agreement between the City and Many Mansions. However, the AHSC Program grant funds are disbursed on a reimbursement basis. If Many Mansions is awarded Affordable Housing and Sustainable Communities grant funds, city staff may need to return to Council to identify the initial funding source and recognize appropriate funds for the City to complete the improvements and programs on a reimbursable basis.
1093

RECOMMENDATION
11 That the City Council:

1. Authorize the Mayor, or his designee, to execute a Preliminary Funding Award Letter with Many Mansions, a non-profit affordable housing provider, gap financing in the amount of $1,200,000 for the construction of eightyeight (87) affordable rental units and one (1) unrestricted manager’s unit, commonly known as Aspire Apartments located at 536-538 Meta Street, Oxnard, CA 93030;

2. Authorize the Mayor, or his designee, to execute an Implementation Agreement with Many Mansions to receive pass-through grant funding associated with the Aspire Apartments Affordable Housing and Sustainable Communities Program application.
1094

CITY COUNCIL AGENDA REPORT

REPORTS
AGENDA ITEM NO. N.3
DATE: March 4, 2024
TO: City Council
FROM: Emilio Ramirez, Housing Director, (805) 385-8094, [email protected] SUBJECT: Prohousing Designation. (15 minutes)

RECOMMENDATION
That the City Council:

1. Adopt a resolution authorizing the City Manager to apply to the California Department of Housing and Community Development for the City to participate in the State’s Prohousing Designation Program; and

2. Authorize the City Manager or designee to accept the designation and execute and submit all documents required as deemed necessary or appropriate to participate in the Program. (Due to a March 19, 2024 Affordable Housing and Sustainable communities Program grant application deadline this item did not originate in the Committee.)
Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/n6LvcXTt5ow

BACKGROUND

EXECUTIVE SUMMARY
The 2019-2020, California State Budget Act provided a wide spectrum of support, incentives, and accountability measures for jurisdictions to meet California’s housing goals. On July 1, 2021, the California Department of Housing and Community Development (HCD) established the Prohousing Designation Program (“Program”) to achieve these goals.

The Prohousing Designation Program offers an opportunity for new affordable housing projects and off-site infrastructure projects that support affordable housing development to receive additional points when applying for certain HCD funded programs. This Program enables HCD to designate jurisdictions throughout the state as Prohousing when they demonstrate policies and planning programs that accelerate the production of housing. If approved by the Council and HCD, the Prohousing designation will be applicable throughout the City of Oxnard.

One such HCD funded program that benefits with additional points in the grant application is the Affordable Housing & Sustainable Communities (AHSC) and Infill Infrastructure Grant (IIG) Programs. The AHSC grant was released in January and is due on March 19, 2024. A project that receives funding from a program such as the AHSC program can result in multiple benefits to the community it is being developed in. A direct example of this is the Central Terrace Apartments, an 88-unit affordable housing rental development located at 217-235 East Sixth Street in downtown Oxnard that is currently under construction. The project received $15 million in AHSC funding to construct the 88-unit affordable housing development and an additional $8 million that will be used towards the construction of the City's 4th Street Mobility Improvements Project. The 4th Street Mobility Improvement project is one of the Capital Improvements Projects currently listed in the City’s 2022-2027 Capital Improvement Programs. Its objective is to promote and accommodate more pedestrians and bicyclists to access downtown Oxnard from surrounding neighborhoods and from the 1095
Oxnard Transit Center.

There is an opportunity for the Aspire Apartments, just north of the Central Terrace project, located at 536 -538 Meta Street, to apply for the AHSC grant and to take advantage of the incentive scoring offered by the Prohousing Designation Program. This project includes 87-unit affordable housing rental project. Many Mansions, the developer of Aspire Apartments, will apply for AHSC funding for the project. If the City is awarded a Prohousing designation, Many Mansions can use the City’s Prohousing status to supplement additional points in their AHSC application.

DISCUSSION
Staff have conducted an analysis of the 2021-2029 Adopted Amended 6th Cycle Housing Element (Housing Element) and determined that it would be advantageous for the City to apply for this designation. Although City staff had previously considered pursuing a Prohousing Designation staff was not able to immediately apply for the program because additional time was needed to ensure that the City obtained the highest Prohousing Program score. Staff found a real value in the Pro Housing designation after multitude California jurisdictions received a designation and potential damages a competitive advantage in future grant applications.

In order to acquire the Prohousing designation, the City must score a minimum of 30 points. Staff has determined that the City’s existing Housing Element programs and policies should provide the City with the necessary scoring to secure a Prohousing Designation. Based upon an analysis of the HCD certified Housing Element and City Council approved ordinances implementing the Housing Element, the City currently has a total of 48 points.

Examples of Council actions and Housing Element programs reflecting a Prohousing designation include:

1. Ordinance 2999 (Affordable Housing Additive Zones): In October 19, 2021, the City Council adopted new regulations to streamline the construction of affordable housing by creating the Affordable Housing, Permitted (AH-P) and Affordable Housing, Discretionary (AH-D) additive overlay zone on specific parcels within the City. The additive overlay provides objective standards for the development of affordable multifamily housing by allowing a development to construct at least 30 dwelling units per acre if they provide at least 20% of the on-site units affordable to lower income households. Those projects that are located on an AH-P site are approved ministerial and those projects located on an AH-D site are approved through a discretionary permit which is granted by either the Planning Commission or City Council.

2. Program 10 (Inclusionary Housing Program): Developers of new residential projects containing ten (10) or more for-sale or for-rent dwelling units are required to provide 10 percent of the total units as on-site affordable housing for low income households in the manner specified in Ordinances 2980, or make an in-lieu Affordable Housing Payment to the City’s Affordable Housing Trust Fund. This program is ongoing and will be monitored annually.

3. Downtown Code: Originally drafted in 2016 and approved in 2019; the DT Code allows for residential or mixed uses in one or more non-residential zones (e.g., commercial, light industrial). Qualifying non-residential zones do not include open space or substantially similar zones.

The following proposed programs listed on the 2021-2029 Adopted Amended 6th Cycle Housing Element (Housing Element) will be included as part of the application:

1. Teal Club Specific Plan: This specific plan satisfies sub-category 1B (permitting missing middle housing uses; triplexes and fourplexes by right in existing low density, single-family residential zones) of the application. The proposed plan includes 990 units in a range of affordability and densities, 148 units will be affordable to lower income households.

2. Maulhardt Specific Plan: The Maulhardt Specific Plan Amendment includes 530 units, of which 106 will be restricted as affordable to lower income households. Similar to the Teal Club Specific Plan, this meets the requirement of missing middle housing uses in low-density, single-family residential zones.

3. Program 5 (Parcel Assemblage): In an effort to create additional opportunities for redevelopment and affordable housing, the City will encourage and prioritize lot consolidation for affordable housing and redevelopment in high opportunity areas to increase mobility options for lower-income households and improve access to resources. This 1096
program falls in line with the application’s Favorable Zoning and Land Use category.

4. Program 31 (Oxnard Boulevard Corridor): In 2016, the City completed a $250,000 Caltrans-funded planning study focused on transforming 7.2 miles of former State highways that run through the city into complete streets suitable for transit that would serve new medium- and high-density transit-oriented mixed-use and affordable housing development. This program involves establishing a transit corridor specific plan with 20% inclusionary requirements and developing an implementation and financing approach that would both fund the street improvements and identify multifamily housing opportunity sites.

5. Program 36 (Accessory Dwelling Unit Promotion Program): The program is meant to encourage and publicize the ADU program to increase public awareness and promote the construction of ADUs to homeowners in moderate and higher resource areas. Awareness is accomplished through inserting informational flyers in monthly bills, providing additional information on the City’s website or public service announcements on Oxnard TV channel.

6. Program 42 (Accessory Dwelling Unit Construction Cost Assistance and Accelerator Program): The City will establish an ADU Construction Cost Assistance and Accelerator Program that pairs lower-income households on a wait list with homeowners willing to offer their ADUs as affordable rentals for a period of up to 55 years. In exchange, homeowners would receive assistance from the Housing Department to offset a portion of the cost of ADU construction to apply towards building permit plan check fees, with the balance available to owners to apply towards the owner’s construction costs. This satisfies sub-category 4D of the application, by providing grants or low-interest loans for ADU construction.

Benefits of Prohousing Designation:

A Prohousing Designation grants additional points or other preferences in the scoping of applications for competeive state-funded housing and infrastructure programs. Additionally, jurisdictions that obtain a proposing designation are eligible to receive grant funding through the Prophousing Incentive Program (PIP) that can be used for planning or implementation activities related to housing and community development, including:

1. Matching portions of funds placed into local or regional housing trust funds;

2. Capitalized reserves for services in new permanent supportive housing;

3. Assisting persons who are experiencing or at risk of homelessness, including providing rapid rehousing, rental assistance, navigation centers, emergency shelters, and the new construction, rehabilitation, and preservation of permanent and transitional housing;

4. Efforts to acquire and rehabilitate foreclosed or vacant homes;

5. Fiscal incentives or matching funds to local agencies that approve new housing for extremely low, very low, low-, and moderate-income households;

6. Accessibility modifications;

7. Homeownership opportunities, including down payment assistance; and

8. Predevelopment, development, acquisition, rehabilitation, and preservation of multifamily, residential live-work, and rental housing that is affordable to a variety of income levels.

To apply for a Prohousing designation the City must:

1. Acknowledge and confirm that the City is currently in compliance with applicable state housing laws and will continue to comply with applicable housing laws;

2. Adopt a resolution authorizing an application submittal; and

3. Document compliant local policies.
1097
The application is a self-scoring worksheet split into four categories including; Favorable Zoning and Land Use, Acceleration of Housing Production Timeframes, Reduction of Construction and Development Costs, and Providing Financial Subsidies.

STRATEGIC PRIORITIES
This agenda item supports the Infrastructure and Natural Resources strategy. The purpose of the Infrastructure and Natural Resources strategy is to preserve and improve our roads, utilities, parks, trees, water supply and natural resources through effective planning, prioritization, and an equitable and efficient use of available funding.

This agenda item supports the Quality-of-Life strategy. The purpose of the Quality-of-Life strategy is to restore and increase quality services and programs that enrich Oxnard's diverse community, promotes safe neighborhoods, encourages community engagement, and supports our residents in their efforts to improve their quality of life.

FINANCIAL IMPACT
There is no financial impact associated with applying for a Prohousing designation. If awarded, the City will be eligible to apply for HCD’s PIP grant funding, a $26 million state investment from the Building Homes and Jobs Trust Fund.

There are a number of other grant funded programs and opportunities which the City will be eligible for as a result of HCD Program designation.

COMMITTEE OUTCOME
This item did not originate in Committee.

In an effort to assist Many Mansions in obtaining bonus Prohousing points for their Aspire Apartments AHSC application, the Prohousing application must be submitted to HCD prior to the AHSC application deadline in March. As such there was no time to take this item to committee if the City is going to meet the AHSC grant deadline.

Prepared by: Emilio Ramirez, Housing Director

ATTACHMENTS

1. Resolution Authorizing Program Application_

2. Certification and Acknowledgement Form_

3. HCD Prohousing Application Packet

4. Presentation
1098

CITY COUNCIL OF THE CITY OF OXNARD
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OXNARD

AUTHORIZING APPLICATION TO AND PARTICIPATION IN THE PROHOUSING

DESIGNATION PROGRAM
WHEREAS, Government Code section 65589.9 established the Prohousing Designation Program (“Program”), which creates incentives for jurisdictions that are compliant with state housing element requirements and that have enacted Prohousing local policies; and WHEREAS, such jurisdictions will be designated Prohousing, and, as such, will receive additional points or other preference during the scoring of their competitive Applications for specified housing and infrastructure funding; and
WHEREAS, the California Department of Housing and Community Development (“Department”) has adopted regulations (Cal. Code Regs., tit. 25, § 6600 et seq.) to implement the Program (“Program Regulations”), as authorized by Government Code section 65589.9, subdivision (d); and
WHEREAS, the City of Oxnard (“Applicant”) desires to submit an Application for a Prohousing Designation (“Application”).

NOW, THEREFORE, the City Council of the City of Oxnard resolves as follows:

1. Applicant is hereby authorized and directed to submit an Application to the Department.

2. Applicant acknowledges and confirms that it is currently in compliance with applicable state housing law.

3. Applicant acknowledges and confirms that it will continue to comply with applicable housing laws and to refrain from enacting laws, developing policies, or taking other local governmental actions that may or do inhibit or constrain housing production. Examples of such local laws, policies, and actions include moratoriums on development; local voter approval requirements related to housing production; downzoning; and unduly restrictive or onerous zoning regulations, development standards, or permit procedures. Applicant further acknowledges and confirms that the Prohousing Policies in its Application comply with its duty to Affirmatively Further Fair Housing pursuant to Government Code sections 8899.50 and 65583. Applicant further acknowledges and confirms that its general plan is in alignment with an adopted sustainable communities strategy pursuant to Public Resources Code sections 21155- 21155.4. Applicant further acknowledges and confirms that its policies for the treatment of homeless encampments on public property comply do and will continue to comply with the Constitution and that it has enacted best practices in its jurisdiction that are consistent with the United States Interagency Council on Homelessness’ “7 Principles for Addressing Encampments” (June 17, 2022, update).

4. If the Application is approved, Applicant is hereby authorized and directed to enter into, execute, and deliver all documents required or deemed necessary or appropriate to participate in the Program, and all amendments thereto (the “Program Documents”). 1099

5. Applicant acknowledges and agrees that it shall be subject to the Application, the terms and conditions specified in the Program Documents, the Program Regulations, and any and all other applicable law.

6. The City Manager or designee, is authorized to execute and deliver the Application and the Program Documents on behalf of the Applicant for participation in the Program.

PASSED AND ADOPTED THIS ______ day of February 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

John C. Zaragoza, Mayor
ATTEST:

Rose Chaparro, City Clerk
APPROVED AS TO FORM:

Stephen M. Fischer, City Attorney
1100

CERTIFICATION AND ACKNOWLEDGMENT
As authorized by the Formal Resolution for the Prohousing Designation Program (Resolution No.      ), which is attached hereto and incorporated by reference as if set forth in full, I hereby submit this full and complete application on behalf of the applicant.

I certify that all information and representations set forth in this application are true and correct.

I further certify that any proposed Prohousing Policy identified herein will be enacted within two (2) years of the date of this application submittal.

I acknowledge that this application constitutes a public record under the California Public Records Act (Gov. Code, § 7920.000 et seq.) and is therefore subject to public disclosure by the Department.

Signature: __________________________________________
Name and Title: Alexander Nguyen, City Manager
Date: _______________________________________________
Legislative Information
District Number Legislators Name(s)
State
Assembly
District
19 Monique Limon
State
Senate
District
38 Steve Bennett
Applicants can find their respective State Senate representatives at https://www.senate.ca.gov/, and their respective State Assembly representatives at https://www.assembly.ca.gov/
1101
Prohousing Designation Program Application
State of California
Governor Gavin Newsom
Melinda Grant, Undersecretary
Business, Consumer Services and Housing Agency
Gustavo Velasquez, Director
Department of Housing and Community Development
Megan Kirkeby, Deputy Director
Division of Housing Policy Development
2020 West El Camino, Suite 500
Sacramento, CA 95833
Website: https://www.hcd.ca.gov/community-development/prohousing Email: [email protected]
January 2024
1102
Prohousing Designation Program Application Package Instructions The applicant is applying for a Prohousing Designation under the Prohousing Designation Program (“Prohousing” or “Program”), which is administered by the Department of Housing and Community Development (“Department”) pursuant to Government Code section 65589.9.

The Program creates incentives for Jurisdictions that are compliant with State Housing Element Law and that have enacted Prohousing Policies. These incentives will take the form of additional points or other preference in the scoring of applications for competitive housing and infrastructure programs. The administrators of each such program will determine the value and form of the preference.

In order to be considered for a Prohousing Designation, the applicant must accurately complete all sections of this application, including any relevant appendices. The Department reserves the right to request additional clarifying information from the applicant.

This application is subject to Government Code section 65589.9 and to the regulations (Cal. Code Regs., tit. 25, § 6600 et seq.) adopted by the Department in promulgation thereof (“Regulations”).

All capitalized terms in this application shall have the meanings set forth in the Regulations.

All applicants must submit a complete, signed application package to the Department, in electronic format, in order to be considered for a Prohousing Designation. Please direct electronic copies of the completed application package to the following email address:

[email protected].

A complete application will include all items identified in the Application Checklist.

In relation to Appendix 1, the Formal Resolution for the Prohousing Designation Program, please use strikethrough and underline if proposing any modifications to the text of the Resolution. Please be aware, any sustentative deviations from the Formal Resolution may result in an incomplete application and will likely be subject to additional internal review and potential delays.

Appendix 2, the Proposed Policy Completion Schedule, applies only if an application includes proposed policies.

Appendix 3, Project Proposal Scoring Sheet and Sample Project Proposal Scoring Sheet, includes a blank template to be completed by the applicant as part of the application, as well as a Sample Project Proposal Scoring Sheet with an example of how this template may be completed.

Appendix 4 lists examples of Prohousing Policies with enhancement factors to aid applicants in understanding how enhancement factors may be applied.

Appendix 5 is where the applicant will include any additional information and supporting documentation for the application.

If you have questions regarding this application or the Program, or if you require technical assistance in preparing this application, please email [email protected]. 1103
Application Checklist
Yes No
Application Information ☒ ☐
Certification and Acknowledgement ☒ ☐
The Legislative Information form is completed. ☒ ☐
The Threshold Requirements Checklist is completed. ☒ ☐
A duly adopted and certified Formal Resolution for the Prohousing Designation Program is included in the application package. (See Appendix 1 for the Formal Resolution for the Prohousing Designation Program form.)
☒ ☐
If applicable, the Proposed Policy Completion Schedule is completed. (See Appendix 2.)
☒ ☐
The Project Proposal Scoring Sheet is completed. (See Appendix 3 for the Project Proposal Scoring Sheet and the Sample Project Proposal Scoring Sheet.)
☒ ☐
Additional information and supporting documentation (Applicant to provide as Appendix 5)
☒ ☐
Application Information
Applicant (Jurisdiction): City of Oxnard Housing Department Applicant Mailing Address: 435 South “D” Street
City: Oxnard
ZIP Code: 93030
Website: https://www.oxnard.org/citydepartment/housing/ Authorized Representative Name Emilio Ramirez
Authorized Representative Title: Housing Director
Phone: (805) 385-8094
Email: [email protected]
Contact Person Name: Jan Bustalino
Contact Person Title: Development Specialist
Phone: (818) 929-1035
Email: [email protected]
Proposed Total Score (Based on
Appendix 3):
48 1104

CERTIFICATION AND ACKNOWLEDGMENT
As authorized by the Formal Resolution for the Prohousing Designation Program (Resolution No. ), which is attached hereto and incorporated by reference as if set forth in full, I hereby submit this full and complete application on behalf of the applicant.

I certify that all information and representations set forth in this application are true and correct.

I further certify that any proposed Prohousing Policy identified herein will be enacted within two (2) years of the date of this application submittal.

I acknowledge that this application constitutes a public record under the California Public Records Act (Gov. Code, § 6250 et seq.) and is therefore subject to public disclosure by the Department.

Signature: __________________________________________
Name and Title: Alexander Nguyen, City Manager
Date: _______________________________________________
Legislative Information
District Number Legislators Name(s)
State
Assembly
District
19 Monique Limon
State
Senate
District
38 Steve Bennett
Applicants can find their respective State Senate representatives at https://www.senate.ca.gov/, and their respective State Assembly representatives at https://www.assembly.ca.gov/
1105
Threshold Requirements Checklist
The applicant meets the following threshold requirements in accordance with Section 6604 of the Regulations:

Yes No
The applicant is a Jurisdiction. ☒ ☐
The applicant has adopted a Compliant Housing Element. ☒ ☐ The applicant has submitted or will submit a legally sufficient Annual Progress Report prior to designation.
☒ ☐
The applicant has completed or agrees to complete, on or before the relevant statutory deadlines, any rezone program or zoning that is necessary to remain in compliance with Government Code sections 65583, subdivision (c)(1), and 65584.09, subdivision (a), and with California Coastal Commission certification where appropriate. ☒ ☐
The applicant is in compliance, at the time of the application, with applicable state housing law, including, but not limited to those included in Government Section 65585, subdivision (j); laws relating to the imposition of school facilities fees or other requirements (Gov. Code, § 65995 et seq.); Least Cost Zoning Law (Gov. Code, § 65913.1); Permit Streamlining Act (Gov. Code, § 65920 et seq.); and provisions relating to timeliness of CEQA processing by local governments in Public Resources Code sections 21080.1, 21080.2, and 21151.5(a). ☒ ☐
The applicant further acknowledges and confirms that its treatment of homeless encampments on public property complies with and will continue to comply with the constitutional rights of persons experiencing homelessness and that it has submitted a one-page summary to the Department demonstrating how the applicant has enacted best practices in their jurisdiction related to the treatment of unhoused individuals camping on public property, consistent with United States Interagency Council on Homelessness’ “7 Principles for Addressing Encampments,” (June 17, 2022 update), hereby incorporated by reference. ☒ ☐
The applicant has duly adopted and certified, by the applicant’s governing body, a Formal Resolution for the Prohousing Designation Program, which is hereby incorporated by reference. (A true and correct copy of the resolution is included in this application package.) ☒ ☐
1106
Project Proposal
Category 1: Favorable Zoning and Land Use
Category Prohousing Policy Description Points
1A Sufficient sites, including rezoning, to accommodate 150 percent or greater of the current or draft RHNA, whichever is greater, by total and income category. These additional sites must be identified in the Jurisdiction’s housing element adequate sites inventory, consistent with Government Code section 65583, subdivisions (a)(3) and (c)(1). 3 1B Permitting missing middle housing uses (e.g., duplexes, triplexes, and fourplexes) by right in existing low-density, single-family residential zones in a manner that exceeds the requirements of SB 9 (Chapter 162, Statutes of 2021, Gov. Code, §§ 65852.21, 66411.7). 3 1C Sufficient sites, including rezoning, to accommodate 125 to 149 percent of the current or draft RHNA, whichever is greater, by total and income category. These points shall not be awarded if the applicant earns three points pursuant to Category (1)(A) above. These additional sites must be identified in the Jurisdiction’s housing element adequate sites inventory, consistent with Government Code section 65583, subdivisions (a)(3) and (c)(1).
2 1D Density bonus programs that allow additional density for additional affordability beyond minimum statutory requirements (Gov. Code, § 65915 et seq.).
2 1E Increasing allowable density in low-density, single-family residential areas beyond the requirements of state Accessory Dwelling Unit Law, (Gov. Code, §§ 65852.2, 65852.22) (e.g., permitting more than one converted ADU; one detached, new construction ADU; and one JADU per single-family lot), and in a manner that exceeds the requirements of SB 9 (Chapter 192, Statutes of 2021, Gov. Code, §§ 65852.21, 66411.7). These policies shall be separate from any qualifying policies under Category (1)(B).
2 1F Eliminating minimum parking requirements for residential development as authorized by Government Code section 65852.2; adopting vehicular parking ratios that are less than the relevant ratio thresholds at subparagraphs (A), (B), and (C) of Gov. Code section 65915, subdivision (p)(1); or adopting maximum parking requirements at or less than ratios pursuant to Gov. Code section 65915, subdivision (p).
2 1G Zoning or incentives that are designed to increase affordable housing development in a range of types, including, but not limited to, large family units, Supportive Housing, housing for transition age foster youth, and deep affordability targeted for Extremely Low-Income Households in all parts of the Jurisdiction, with at least some of the zoning, other land use designation methods, or incentives being designed to increase affordable housing development in higher resource areas shown in the TCAC/HCD Opportunity Map, and with the Jurisdiction having confirmed that it considered and addressed potential environmental justice issues in adopting and implementing 2 1107
this policy, especially in areas with existing industrial and polluting uses.
1H Zoning or other land use designation methods to allow for residential or mixed uses in one or more non-residential zones (e.g., commercial, light industrial). Qualifying non-residential zones do not include open space or substantially similar zones.
1 1I Modification of development standards and other applicable zoning provisions or land use designation methods to promote greater development intensity. Potential areas of focus include floor area ratio, height limits, minimum lot or unit sizes, setbacks, and allowable dwelling units per acre. These policies must be separate from any qualifying policies under Category (1)(B) above.
1 1J Establishment of a Workforce Housing Opportunity Zone, as defined in Government Code section 65620, or a Housing Sustainability District, as defined in Government Code section 66200.
1 1K Establishment of an inclusionary housing program requiring new developments to include housing affordable to and reserved for lowand very low-income households, consistent with the requirements of AB 1505 (Chapter 376, Statutes of 2017, Gov. Code, § 65850.01). 1 1L Other zoning and land use actions not described in Categories (A)-(K) of this section that measurably support the Acceleration of Housing Production.
1 1108
Project Proposal
Category 2: Acceleration of Housing Production Timeframes Category Prohousing Policy Description Points
2A Establishment of ministerial approval processes for multiple housing types, including, for example, single-family, multifamily and mixed-use housing.
3 2B Acceleration of Housing Production through the establishment of streamlined, program-level CEQA analysis and certification of general plans, community plans, specific plans with accompanying Environmental Impact Reports (EIR), and related documents. 2 2C Documented practice of streamlining housing development at the project level, such as by enabling a by-right approval process or by utilizing statutory and categorical exemptions as authorized by applicable law, (e.g., Pub. Resources Code, §§ 21155.1, 21155.4, 21159.24, 21159.25; Gov. Code, § 65457; Cal Code Regs., tit. 14, §§ 15303, 15332; Pub. Resources Code, §§ 21094.5, 21099, 21155.2, 21159.28).
2 2D Establishment of permitting processes that take less than four months to complete. Policies under this category must address all approvals necessary to issue building permits.
2 2E Absence or elimination of public hearings for projects consistent with zoning and the general plan.
2 2F Priority permit processing or reduced plan check times for homes affordable to Lower-Income Households.
1 2G Establishment of consolidated or streamlined permit processes that minimize the levels of review and approval required for projects, and that are consistent with zoning regulations and the general plan. 1 2H Absence, elimination, or replacement of subjective development and design standards with objective development and design standards that simplify zoning clearance and improve approval certainty and timing.
1 2I Establishment of one-stop-shop permitting processes or a single point of contact where entitlements are coordinated across city approval functions (e.g., planning, public works, building) from entitlement application to certificate of occupancy.
1 2J Priority permit processing or reduced plan check times for ADUs/JADUs or multifamily housing.
1 2K Establishment of a standardized application form for all entitlement applications.
1 2L Documented practice of publicly posting status updates on project permit approvals on the internet.
1 2M Limitation on the total number of hearings for any project to three or fewer. Applicants that accrue points pursuant to category (2)(E) are not eligible for points under this category.
1 2N Other policies not described in Categories (2)(A)-(M) of this section that quantifiably decrease production timeframes or promote the streamlining of approval processes.
1 1109
Project Proposal
Category 3: Reduction of Construction and Development Costs Category Prohousing Policy Description Points
3A Waiver or significant reduction of development impact fees for residential development with units affordable to Lower-Income Households. This provision does not include fees associated with the provision of housing affordable to Lower-Income Households (e.g., inclusionary in lieu fees, affordable housing impact fees, and commercial linkage fees).
3 3B Adoption of policies that result in less restrictive requirements than Government Code sections 65852.2 and 65852.22 to reduce barriers for property owners to create ADUs/JADUs. Examples of qualifying policies include, but are not limited to, development standards improvements, permit processing improvements, dedicated ADU/JADU staff, technical assistance programs, and pre-approved ADU/JADU design packages.
2 3C Adoption of other fee reduction strategies separate from Category (3)(A), including fee deferrals and reduced fees for housing for persons with special needs. This provision does not include fees associated with the provision of housing affordable to Lower-Income Households (e.g., inclusionary in lieu fees, affordable impact fees and commercial linkage fees).
1 3D Accelerating innovative housing production through innovative housing types (e.g., manufactured homes, recreational vehicles, park models, community ownership, and other forms of social housing) that reduce development costs.
1 3E Measures that reduce costs for transportation-related infrastructure or programs that encourage active modes of transportation or other alternatives to automobiles. Qualifying policies include, but are not limited to, publicly funded programs to expand sidewalks or protect bike/micro-mobility lanes, creation of on-street parking for bikes, transit-related improvements, or establishment of carshare programs. 1 3F Adoption of universal design ordinances pursuant to Health and Safety Code section 17959.
1 3G Establishment of pre-approved or prototype plans for missing middle housing types (e.g., duplexes, triplexes, and fourplexes) in lowdensity, single-family residential areas. 1 3H Adoption of ordinances that reduce barriers, beyond existing law, for the development of housing affordable to Lower-Income Households. 1 3I Other policies not described in Categories (3)(A)-(H) of this section that quantifiably reduce construction or development costs. 1 1110
Project Proposal
Category 4: Providing Financial Subsidies
Category Prohousing Policy Description Points
4A Establishment of a housing fund or contribution of funds towards affordable housing through proceeds from approved ballot measures.
2 4B Establishment of local housing trust funds or collaboration on a regional housing trust fund, which include the Jurisdiction’s own funding contributions. The Jurisdiction must contribute to the local or regional housing trust fund regularly and significantly. For the purposes of this Category, “regularly” shall be defined as at least annually, and “significant” contributions shall be determined based on the impact the contributions have in accelerating the production of affordable housing.
2 4C Demonstration of regular use or planned regular use of funding (e.g., federal, state, or local) for preserving assisted units at-risk of conversion to market rate uses and conversion of market rate uses to units with affordability restrictions (e.g., acquisition/rehabilitation).

For the purposes of this category, “regular use” can be demonstrated through the number of units preserved annually by utilizing this funding source.
2 4D Provide grants or low-interest loans for ADU/JADU construction affordable to Lower- and Moderate-Income Households.
2 4E A comprehensive program that complies with the Surplus Land Act (Gov. Code, § 54220 et seq.) and that makes publicly owned land available for affordable housing, or for multifamily housing projects with the highest feasible percentage of units affordable to Lower Income Households. A qualifying program may utilize mechanisms such as land donations, land sales with significant write-downs, or below-market land leases.
2 4F Establishment of an Enhanced Infrastructure Financing District or similar local financing tool that, to the extent feasible, directly supports housing developments in an area where at least 20 percent of the residences will be affordable to Lower-Income Households. 2 4G Prioritization of local general funds to accelerate the production of housing affordable to Lower-Income Households.
2 4H Directed residual redevelopment funds to accelerate the production of affordable housing.
1 4I Development and regular (at least biennial) use of a housing subsidy pool, local or regional trust fund, or other similar funding source sufficient to facilitate and support the development of housing affordable to Lower-Income Households.
1 1111
4J Prioritization of local general funds for affordable housing. This point shall not be awarded if the applicant earns two points pursuant to Category (4)(G).
1 4K Providing operating subsidies for permanent Supportive Housing. 1 4L Providing subsidies for housing affordable to Extremely Low-Income Households.
1 4M Other policies not described in Categories (4)(A)-(L) of this section that quantifiably promote, develop, or leverage financial resources for housing affordable to Lower-Income Households.
1 1112
Project Proposal
Enhancement Factors
The Department shall utilize enhancement factors to increase the point scores of Prohousing Policies. An individual Prohousing Policy may not use more than one enhancement factor.

Each Prohousing Policy will receive extra points for enhancement factors in accordance with the chart below.

Category Prohousing Policy Description Points
1 The policy represents one element of a unified, multi-faceted strategy to promote multiple planning objectives, such as efficient land use, access to public transportation, housing affordable to Lower-Income Households, climate change solutions, and/or hazard mitigation.
2 2 Policies that promote development consistent with the state planning priorities pursuant to Government Code section 65041.1. 1 3 Policies that diversify planning and target community and economic development investments (housing and non-housing) toward placebased strategies for community revitalization and equitable quality of life in lower opportunity areas. Such areas include, but are not limited to, Low Resource and High Segregation & Poverty areas designated in the most recently updated TCAC/HCD Opportunity Maps, and disadvantaged communities pursuant to Health and Safety Code sections 39711 and 39715 (California Senate Bill 535 (2012).
1 4 Policies that go beyond state law requirements in reducing displacement of Lower-Income Households and conserving existing housing stock that is affordable to Lower-Income Households. 1 5 Rezoning and other policies that support intensification of residential development in Location Efficient Communities.
1 6 Rezoning and other policies that result in a net gain of housing capacity while concurrently mitigating development impacts on or from Environmentally Sensitive or Hazardous Areas.
1 7 Zoning policies, including inclusionary housing policies, that increase housing choices and affordability, particularly for Lower-Income Households, in High Resource and Highest Resource areas, as designated in the most recently updated TCAC/HCD Opportunity Maps.
1 8 Other policies that involve meaningful actions towards Affirmatively Furthering Fair Housing outside of those required pursuant to Government Code sections 65583, subdivision (c)(10), and 8899.50, including, but not limited to, outreach campaigns, updated zoning codes, and expanded access to financing support.
1 1113
Project Proposal Scoring Sheet Instructions
The Department shall validate applicants’ scores based on the extent to which each identified Prohousing Policy contributes to the Acceleration of Housing Production. The Department shall assess applicants’ Prohousing Policies in accordance with statutory requirements and the Regulations.

The Department shall further assess applicants’ Prohousing Policies using the following four scoring categories: Favorable Zoning and Land Use, Acceleration of Housing Production Timeframes, Reduction of Construction and Development Costs, and Providing Financial Subsidies. Applicants shall demonstrate that they have enacted or proposed at least one policy that significantly contributes to the Acceleration of Housing Production in each of the four categories. A Prohousing Designation requires a total score of 30 points or more across all four categories.

Instructions
Please utilize one row of the Scoring Sheet for each Prohousing Policy. ● Category Number: Select the relevant category number from the relevant Project Proposal list in this application. Where appropriate, applicants may utilize a category number more than once. ● Concise Written Description of Prohousing Policy: Set forth a brief description of the enacted or proposed Prohousing Policy.
● Enacted or Proposed: Identify the Prohousing Policy as enacted or proposed. For proposed Prohousing Policies, please complete Appendix 2: Proposed Policy Completion Schedule. ● Documentation Type: For enacted Prohousing Policies, identify the relevant documentary evidence (e.g., resolution, zoning code provisions). For proposed Prohousing Policies, identify the documentation which shows that implementation of the policy is pending.
● Web Links/Electronic Copies: Insert the Web link(s) to the relevant documentation or indicate that electronic copies of the documentation have been attached to this application as Appendix 5. ● Points: Enter the appropriate number of points using the relevant Project Proposal list in this application. ● Enhancement Category Number (optional): If utilizing an enhancement factor for a particular Prohousing Policy, enter the appropriate category number using the relevant Project Proposal list in this application. ● Enhancement Points (optional): If utilizing an enhancement factor for a particular Prohousing Policy, enter the point(s) for that Prohousing Policy.
● Total Points: Add the enhancement point(s) to the Prohousing Policy’s general point score. 1114
RESOLUTION NO.

A RESOLUTION OF THE GOVERNING BODY OF

THE CITY OF OXNARD

AUTHORIZING APPLICATION TO AND PARTICIPATION IN THE PROHOUSING

DESIGNATION PROGRAM
WHEREAS, Government Code section 65589.9 established the Prohousing Designation Program (“Program”), which creates incentives for jurisdictions that are compliant with state housing element requirements and that have enacted Prohousing local policies; and
WHEREAS, such jurisdictions will be designated Prohousing, and, as such, will receive additional points or other preference during the scoring of their competitive Applications for specified housing and infrastructure funding; and
WHEREAS, the California Department of Housing and Community Development (“Department”) has adopted regulations (Cal. Code Regs., tit. 25, § 6600 et seq.) to implement the Program (“Program Regulations”), as authorized by Government Code section 65589.9, subdivision (d); and
WHEREAS, The City of Oxnard (“Applicant”) desires to submit an Application for a Prohousing Designation (“Application”).

THEREFORE, IT IS RESOLVED THAT:

1. Applicant is hereby authorized and directed to submit an Application to the Department.

2. Applicant acknowledges and confirms that it is currently in compliance with applicable state housing law.

3. Applicant acknowledges and confirms that it will continue to comply with applicable housing laws and to refrain from enacting laws, developing policies, or taking other local governmental actions that may or do inhibit or constrain housing production. Examples of such local laws, policies, and actions include moratoriums on development; local voter approval requirements related to housing production; downzoning; and unduly restrictive or onerous zoning regulations, development standards, or permit procedures. Applicant further acknowledges and confirms that the Prohousing Policies in its Application comply with its duty to Affirmatively Further Fair Housing pursuant to Government Code sections 8899.50 and 65583. Applicant further acknowledges and confirms that its general plan is in alignment with an adopted sustainable communities strategy pursuant to Public Resources Code sections 21155- 21155.4. Applicant further acknowledges and confirms that its policies for the treatment of homeless encampments on public property comply do and will continue to comply with the Constitution and that it has enacted best 1115
practices in its jurisdiction that are consistent with the United States Interagency Council on Homelessness’ “7 Principles for Addressing Encampments” (June 17, 2022, update).

4. If the Application is approved, Applicant is hereby authorized and directed to enter into, execute, and deliver all documents required or deemed necessary or appropriate to participate in the Program, and all amendments thereto (the “Program Documents”).

5. Applicant acknowledges and agrees that it shall be subject to the Application, the terms and conditions specified in the Program Documents, the Program Regulations, and any and all other applicable law.

6. The City Manager or designee, is authorized to execute and deliver the Application and the Program Documents on behalf of the Applicant for participation in the Program.

PASSED AND ADOPTED this day of , 2024, by the following vote:

AYES: ________ NOES: ________ ABSENT: ________ ABSTAIN: ________ The undersigned, Rose Chaparro, City Clerk of Applicant, does hereby attest and certify that the foregoing is a true and full copy of a resolution of the Applicant’s governing body adopted at a duly convened meeting on the date above-mentioned, and that the resolution has not been altered, amended, or repealed.

SIGNATURE: DATE:

NAME: TITLE:
1116
Appendix 2: Proposed Policy Completion Schedule
Category
Number
Concise Written Description of
Proposed Policy
Key Milestones and
Milestone Dates
Anticipated
Completion
Date
Notes
1B The Teal Club and Maulhardt Specific Plan
permit missing middle housing uses in the lowdensity, single-family residential zones. These two specific plan sites were included within the
2021-2029 Housing Element Supplement 1.

Teal Club EIR public review
Dec 2021-Feb 2022.

Teal Club Specific Plan
Community Workshop April
2022
Teal Club
Specific Plan
Fall 2024
Maulhardt
Specific Plan
Summer 2025
Teal club Specific Plan includes 990 units
in a range of affordability and densities,
including 662 attached residential units at
densities between 18 and 30 du/ac. 148
units will be affordable to lower income
households.

Maulhardt Specific Plan Amendment
includes 530 units, including 172 attached
single-family units and 358 apartments, of
which 106 will be restricted as affordable to
lower income households.
1L Parcel Assemblage and lot consolidation:
waive Parcel Assemblage/Lot Consolidation
fees and reduce setbacks and parking
requirements for development of affordable
housing on small (less than 0.5 acre)
contiguous lots on Housing Element sites.

Ongoing for Housing
Element Period 2021-2029
Ongoing Program 5: Parcel Assemblage.

Per Affirmatively Furthering Fair Housing
(AFFH) objectives, the City will encourage
and prioritize lot consolidation for affordable
housing and redevelopment in high
opportunity areas to increase mobility
options for lower-income households and
improve access to resources.
3D Accessory Dwelling Unit Promotion program:

Maintain ADU webpage on an ongoing basis,
place examples of ADUs on webpage, develop
list of resources, and coordinate with ADU
development and financing community.

Distribute information, including informational
flyers in monthly bills.

Develop list of resources by
Fiscal Year 2023-2024
Ongoing Program 36: ADU Promotion Program.

As a result of the City’s ADU promotion and
streamlining of ADU permits, ADU’s have
been highly successful to date, exceeding
Housing Element annual estimate of 35
AUD/year (Total Housing Element estimate
of 283 ADUs for 2021-2029). As of
November 2023, 222 building permits have
been issued for ADUs in the City’s 2021-
2029 Housing Element reporting period.
1117
4D ADU Construction Cost Assistance: The City
will establish an ADU Construction Cost
Assistance and Accelerator Program that pairs
lower income households on a wait list with
homeowners willing to offer their ADUs as
affordable rentals for a period of up to 55
years. In exchange, homeowners would
receive assistance
from the Housing Department to offset a
portion of the cost of ADU construction to apply
towards building permit plan check fees, with
the balance available to owners to apply
towards the owner’s construction costs.

Fiscal year 2025-2026 December
2025
Program 42: ADU Construction Cost
Assistance and Accelerator Program
4F Oxnard Boulevard Corridor, High Quality
Transit Corridor - this program involves
establishing a transit corridor specific plan with
20% inclusionary requirements and developing
an implementation and financing approach that
would both fund the street improvements and
identify multifamily housing opportunity sites.

September 2022 - Received
notification of grant approval
from Southern California
Association of Governments
(SCAG) for a Regional Early
Action Planning Grant for
Housing Infill on Public and
Private Lands (REAP 2.0
HIPP).

Administrative Draft
December 2024,
City Council December 2025
December
2025
Program 31: Oxnard Boulevard Corridor,
High Quality Transit Corridor
1118
Appendix 3: Project Proposal Scoring Sheet and Sample Project Proposal Scoring Sheet Project Proposal Scoring Sheet
Category
Number
Concise Written Description of
Prohousing Policy
Enacted
or
Proposed
Documentation Type
(e.g., resolution,
zoning code)
Insert Web Links to
Documents or Indicate
that Electronic Copies
are Attached as
Appendix 5
Points Enhancement
Category
Number
Enhancement
Points
Total
Points
1B Permitting missing middle
housing uses (e.g., triplexes
and fourplexes) by right in
existing low density, singlefamily residential zones in a manner that exceeds the
requirements of SB 9
(Chapter 162, Statutes of
2021, Gov. Code, §§
65852.21, 66411.7).

Proposed
Northeast Community
and Teal Club
Specific Plans
2023 Community
Development Projects,
(Pages 58 & 59)
3 1E Increasing allowable density
in low-density, single- family
residential areas beyond the
requirements of state
Accessory Dwelling Unit law
(e.g., permitting more than
one ADU or JADU per singlefamily lot), and in a manner that exceeds the requirements
of SB 9 (Chapter 162,
Statutes of 2021, Gov. Code,
§§ 65852.21, 66411.7). These
policies shall be separate from
any qualifying policies under
paragraph (1)(B).

Enacted Ordinance 2999:
(Additive Zones)
Affordable Housing
Permitted &
Affordable Housing
Discretionary
https://www.oxnard.or
g/wpcontent/uploads/2021/
10/Ordinance-No.-
2999.pdf
2 6 1 3
1119
1F Eliminating minimum parking
requirements for residential
development as authorized by
Government Code section
65852.2; adopting vehicular
parking ratios that are less
than the relevant ratio
thresholds at subparagraphs
(A), (B), and (C) of
Government Code section
65915, subdivision (p)(1); or
adopting maximum parking
requirements at or less than
ratios pursuant to Government
Code section 65915,
subdivision (p).

Enacted Downtown Code:

Parking and
Vehicular Access
Standards in DT-G
Zone (Sec 16-147)
Downtown Code
(Page 19)
2213
1H Zoning or other land use
designation methods to allow
for residential or mixed uses
in one or more non-residential
zones (e.g., commercial, light
industrial). Qualifying non-
residential zones do not
include open space or
substantially similar zones.

Enacted Downtown Code:

Allowed Uses (Sec
16-148 )
Downtown Code
(Page 24)
1123
1I Modification of development
standards and other
applicable zoning provisions
or land use designation
methods to promote greater
development intensity.

Potential areas of focus
include floor area ratio; height
limits; minimum lot or unit
sizes; setbacks; and allowable
dwelling units per acre. These
policies must be separate
from any qualifying policies
under paragraph (1)(B).

Enacted Downtown Code:

Downtown Core (DT-
C) Zone (Sec 16-
147.3 Regulating
Plan & Zones)
Downtown Code
(Pages 12 – 15)
1123
1120
1J Establishment of a Workforce
Housing Opportunity Zone, as
defined in Government Code
section 65620, or a Housing
Sustainability District, as
defined in Government Code
section 66200.