2 C2537 - Environmental Resources: Compressed Natural Gas Facility Delete Project Re-evaluating needs based on budgetary constraints. CIP 2025-29
3 C2122 - Environmental Resources: Compressed Natural Gas Facility Delete Project Duplicated Project. CIP 2022-25 4 Westport Light Replacement Delete Project Re-evaluating needs based on budgetary constraints. CIP 2025-29
5 Recycled Water: Water Feature at Campus Park Delete Project Re-evaluating needs based on budgetary constraints. CIP 2025-29
6 LIFT STAT #6 IMPRVMENTS Delete Project Re-evaluating needs based on budgetary constraints. CIP 2020-25
7 OWTP 3W Variable Frequency Drives (VFD) Replacement Delete Project Re-evaluating needs based on budgetary constraints. CIP 2020-25
8 Water Campus: Security Improvements Delete Project Re-evaluating needs based on budgetary constraints. CIP 2025-29
9 Roof Repair - Del Norte Facility Project Delete Project Consolidating CIP Budget - Duplicate dProject. CIP 2020-25
10 Civic Center West Wing Building Improvements
Project merge with M2210 - Civic Center West Wing Building Improvements.
Project without page.
Duplicated Project. CIP 2025-29
11 City Hall and Annex Improvements Project merge with M2212 - City Hall and Annex Improvements.
Project without page. Duplicated Project. CIP 2025-29Page 39 12 Carriage Square/Eastwood Park Project merge with C1403 - CARRIAGE SQUARE NEIGHBORH. Duplicated Project. N/A 13 Public Restroom Improvements Project merge with C9401 - Citywide Park Rehab Program.
Project without page. Consolidating CIP Budget. CIP 2025-29Page 53 14 Oxnard Performing Arts Center Seismic Study/Improvements Project merge with M2307 - PACC - Tier 2 Seismic Evaluation. Consolidating CIP Budget. CIP 2025-29
15 Five Points Park Project merge with C1811 - 5 PTS PROP-LAND ACQ. Consolidating CIP Budget. N/A 16 Traffic Signal Improvements - Intelligent Transportation Systems (ITS) Project merge and Project Title Update.
C2003 - Adaptive Traffic Signals on page 99,
C1704 - ITS SOFTWARE-TRAFFIC SIG without page, and
M2208 - ITS SIGNAL RETIME PHI on page 113
Consolidating CIP Budget. CIP 2025-29
17 Environmental Resources: Security Improvements
Project merge and Project Title Update.
C2020 - Environmental Resources: Video Surveillance
System - Ph II on page 137, and
C2530 - Environmental Resources: Security
Improvements on page 136
Consolidating CIP Budget. CIP 2025-29
18 Water Production: Groundwater Desalter Improvement Project Project merge with M1801 - WATER CAMPUS DESALT PH I.
Project witout page. Consolidating CIP Budget. CIP 2025-29Page 165 19 Oxnard Fire Stations No. 2, 3 Project Modification: Project Title Update CIP 2025-29 Title: Oxnard Fire Stations No. 2, 3, 5
Project split in two: Oxnard Fire Stations No. 2, 3 and Oxnard Fire Station No. 5.
CIP 2025-29
20 Bicycle & Pedestrian Enhancements - Accessibility Enhancements Project Modification: Project Title Update CIP 2025-29 Title: Accessible Pedestrian Enhancements Improving clarity and consistency across CIP documentation. CIP 2025-29Page 98 21 Bicycle & Pedestrian Improvements - Bard Road Corridor Project Modification: Project Title Update
CIP 2025-29 Title: Bard Road Corridor Bicycle & Pedestrian Improvements
Improving clarity and consistency across CIP documentation. CIP 2025-29
22 Bicycle & Pedestrian Improvements - Oxnard Boulevard Project Modification: Project Title Update CIP 2025-29 Title: Oxnard Boulevard Bicycle Facilities Installation Improving clarity and consistency across CIP documentation. CIP 2025-29Page 115 23 Bicycle & Pedestrian Improvements - Ventura Road Corridor Project Modification: Project Title Update
CIP 2025-29 Title: Ventura Road Corridor Bicycle & Pedestrian Improvements
Improving clarity and consistency across CIP documentation. Page 128 CIP 2025-29
24 Local Roadway Safety Plan Various Projects - Citywide Project Modification: Project Title Update CIP 2025-29 Title: Pedestrian Safety Enhancements - Various Locations Improving clarity and consistency across CIP documentation. CIP 2025-29Page 116 City Of Oxnard
City Of Oxnard 274
274 2027-2031 Capital Improvement Program
2027-2031 Capital Improvement Program
505
Appendix F: Canceled & Updated Projects
No. Project Title Update Reason for Cancellation CIP Page 25 Traffic Signal Improvements - Citywide Intersection Modifications (Up to 9) Project Modification: Project Title Update CIP 2025-29 Title: Citywide Intersection Improvements Improving clarity and consistency across CIP documentation. CIP 2025-29Page 107 26 Traffic Signal Improvements - Five Points Intersection Project Modification: Project Title Update CIP 2025-29 Title: Five Points Intersection Improvements Improving clarity and consistency across CIP documentation. CIP 2025-29Page 112 27 Traffic Signal Improvements - Modernization Project Modification: Project Title Update CIP 2025-29 Title: Traffic Signal Modernization Improving clarity and consistency across CIP documentation. CIP 2025-29Page 125 28 Wastewater Collection: Eastern Trunk Manhole Rehabilitation Project Modification: Project Title Update
CIP 2025-29 Title: Wastewater Collection: Sewer Manhole Rehabilitation and Replacement
Project name updated to align with the current project description. CIP 2025-29
29 Wastewater Collection: Ventura & Rice Road Sewers Replacement Project Modification: Project Title Update CIP 2025-29 Title: Wastewater Collection: Gravity Main Improvements Project name updated to align with the current project description. CIP 2025-29Page 144 30 Wastewater OWTP: Digester Improvements
Project Modification: Project Title Update
CIP 2025-29 Title: Wastewater OWTP: Digester/Cogeneration Improvements
Project name updated to align with the current project description. CIP 2025-29
31 Wastewater OWTP: New Interstage Pump Station
Project Modification: Project Title Update
CIP 2025-29 Title: Wastewater OWTP: Interstage Pump Station and Bio-tower Demolition
Project name updated to align with the current project description. CIP 2025-29
32 Wastewater OWTP: New Maintenance Building
Project Modification: Project Title Update
CIP 2025-29 Title: Wastewater OWTP: Maintenance Office Building, Machine Shop, and Storage
Project name updated to align with the current project description. CIP 2025-29
33 Citywide Alleyway Resurfacing/Reconstruction Project Modification: Project Title Update CIP 2025-29 Title: Citywide Alleyway Resurfacing Project name updated to align with the current project scope. CIP 2025-29Page 106 34 Endless Wave Número Dos Skatepark Project Modification: Project Title Update CIP 2025-29 Title: Skatepark in Colonia Project name updated to align with the current project scope. CIP 2025-29Page 89 35 Wastewater Collection: Lift Station #24 Improvements Project Modification: Unappropriating $500,000 from FY25-26 Wastewater Operating Fund Re-evaluating needs based on budgetary constraints. CIP 2025-29N/A 36 Wastewater Collection: UPRR Central Trunk Sewer Pipe Replacement Project Modification: Unappropriating $2,500,000 from FY25-26 Wastewater Operating Fund Re-evaluating needs based on budgetary constraints. CIP 2025-29Page 147 37 Wastewater OWTP: Secondary Sedimentation Tank Mechanical Equipment Replacement
Project Modification: Unappropriating $1,356,847 from FY25-26 Wastewater Operating Fund Re-evaluating needs based on budgetary constraints. CIP 2025-29Page 156 38 Wastewater OWTP: Outfall Repair Project Modification: Unappropriating $1,393,153 from FY25-26 Wastewater Operating Fund Re-evaluating needs based on budgetary constraints. CIP 2025-29Page 153 City Of Oxnard
City Of Oxnard 275
275 2027-2031 Capital Improvement Program
2027-2031 Capital Improvement Program
506
This page left intentionally blank
City Of Oxnard 276 2027-2031 Capital Improvement Program 507
Glossary
City Of Oxnard 277 2027-2031 Capital Improvement Program 508
Glossary of Terms
This glossary defines the terms, abbreviations, status designations, and funding source codes used throughout the City of Oxnard 2027-2031 Capital Improvement Program (CIP), including the User’s Guide to the CIP. Entries are presented in alphabetical order, followed by reference lists of the project classifications and funding source codes used on individual project sheets.
A
Active. A project status indicating that work on the project is currently underway or ongoing.
ADA. Americans with Disabilities Act. Many projects include improvements to bring facilities into ADA compliance.
Annual City Budget. The City’s one-year operating budget, with which the first year of the Capital Budget is coordinated.
Asset Preservation (Group P). A functional group consisting of projects necessary to maintain or protect existing City assets, such as street resurfacing.
AWPF. Advanced Water Purification Facility. A facility at which treated wastewater is further purified for sale to business customers or for groundwater recharge.
B
Bonding. The practice of issuing municipal bonds to raise upfront capital for high value projects, to be repaid over time.
C
Capital Budget. The component of the CIP that establishes the City’s detailed spending plan for the first two fiscal years of the program.
Capital Improvement Program (CIP). A five-year plan that identifies the City’s major capital projects and establishes when each project is expected to occur and how it will be funded.
CFD. Community Facilities District. A special district that levies assessments to fund improvements within its boundaries.
Community Development (Plan Category). A Plan Category corresponding to community development goals within the Oxnard 2030 General Plan.
Construction (Project Phase / Status). The phase of work involving physical construction of the project, or a project status indicating that construction is underway.
Council District. One of the geographic districts represented by a member of the Oxnard City Council. Projects are identified by the district or districts in which they are located.
City Of Oxnard 278 2027-2031 Capital Improvement Program 509
D
Deferred Maintenance. Upkeep that is overdue, generally because it has been delayed due to competing citywide funding priorities.
Design (Project Phase / Status). The phase of work involving the preparation of construction documents, or a project status indicating that design work is underway.
Design Completed. A project status indicating that the design phase has concluded and the project is ready to advance to the next phase.
Development Impact Fee (DIF). A fee collected from development projects and used to fund improvements that mitigate the impacts of that development.
E
Energy Generation and Increased Efficiency (Plan Category). A Plan Category corresponding to energy related goals within the Oxnard 2030 General Plan.
EMS. Energy Management System. A system used to monitor and control building energy use, such as heating and cooling.
Enterprise Fund. A fund supported by revenue from fee based City services, such as water, wastewater, and environmental resources, used to fund operation, maintenance, and capital needs for those utilities.
F
Functional Group. One of three groups, Health and Safety, Asset Preservation, or New or Expanded Services, used in the first step of project prioritization.
Funding Source. The specific fund or revenue stream, identified by a numeric code and name, from which a project is paid.
Funding Total. The sum of all funding sources allocated to a project, presented in the Funding Source table.
Future (column). A column appearing in the financial tables representing costs anticipated beyond Fiscal Year 2031.
G
GAAP. Generally Accepted Accounting Principles. The CIP is prepared in accordance with GAAP.
Gas Tax. State motor fuel tax revenue distributed monthly to local agencies, restricted to use on street maintenance and improvements.
General Fund. The City’s largest operating fund, derived from property tax, sales tax, hotel tax, and business license tax.
General Plan. The Oxnard 2030 General Plan, the City’s long-term policy document, with which the CIP is required to conform.
Grants. Competitive State and Federal awards designated for specific projects, often requiring matching local funds.
City Of Oxnard 279 2027-2031 Capital Improvement Program 510
Group E. A functional group consisting of projects that establish new facilities or increase the capacity of existing facilities.
Group P. A functional group consisting of projects necessary to maintain or protect existing City assets.
Group S. A functional group consisting of projects that are urgent and necessary to maintain or improve public health or safety.
H
Health and Safety (Group S). A functional group consisting of urgent projects needed to maintain or improve public health or safety.
Housing Authority CIP. A separate capital plan, administered in accordance with federal regulations governing public housing funds, covering the City’s public housing properties.
HVAC. Heating, Ventilation, and Air Conditioning. A building system frequently addressed in Buildings classification projects.
I
Inactive. A project status indicating that work on the project is not currently underway.
Infrastructure and Community Services (Plan Category, ICS). The Plan Category corresponding to infrastructure and community service goals within the Oxnard 2030 General Plan. This is the most frequently cited Plan Category in the current CIP.
ISF. Internal Service Fund. A fund, such as the Fleet ISF or Facilities ISF, used to finance equipment and facility needs for internal City operations.
L
LMD. Landscape Maintenance District. A special district funding landscape maintenance within its boundaries.
M
Measure O. A half cent sales tax approved by Oxnard voters in 2008, supporting police, fire, paving, parks, and other general services. Measure O is scheduled to sunset in 2028 unless renewed by the voters.
MSW. Municipal Solid Waste. Refers to the City’s solid waste collection and disposal services.
Municipal Bonds. Debt financing historically used by the City for high value projects, repaid over time from dedicated revenue.
N
New or Expanded Services (Group E). A functional group consisting of projects that create new facilities or increase the capacity of existing facilities.
City Of Oxnard 280 2027-2031 Capital Improvement Program 511
New Projects. Community priorities that have been newly identified and programmed for delivery within the five-year CIP horizon.
O
On Going Program. A project status indicating a recurring program of work rather than a single discrete project.
Operation Impact. A statement on a project sheet of whether completion of the project is anticipated to affect the City’s ongoing operating budget.
OWTP. Oxnard Wastewater Treatment Plant. The facility at which the City’s wastewater is treated, disinfected, and discharged.
P
Plan Category. A field on each project sheet identifying the corresponding goal area within the Oxnard 2030 General Plan supported by the project.
Plan Goal. A field on each project sheet identifying, by code, the specific General Plan goal supported by the project, such as ICS-1.
Planning Commission. The City body that reviews the CIP for conformance with the Oxnard 2030 General Plan and the Local Coastal Plan.
Preliminary Engineering / Environmental. An early project phase involving initial engineering and environmental review.
Previous (column). A column appearing in the financial tables representing amounts expended prior to Fiscal Year 2027.
Project Description. A field on each project sheet summarizing the physical scope of work to be performed.
Project Funding Category. One of five categories, numbered 1 through 5, used in the second step of project prioritization to indicate funding status and relative urgency.
Project Phase. A stage of project delivery, such as Design, Right of Way and Permitting, or Construction, presented in the Project Phase table on each sheet.
Project Status. A field on each project sheet indicating the project’s current stage, such as TBD, Preliminary Engineering, Design, Design Completed, Construction, On Going Program, Active, or Inactive.
Project Total. The sum of all project phase costs for a project, presented in the Project Phase table.
Purpose and Need. A field on each project sheet explaining the need the project addresses or the benefit it is intended to provide.
R
Repair-Reconstruction. A project type focused on existing City facilities that need to be partially or completely rebuilt, generally because the infrastructure has reached the end of its useful life.
City Of Oxnard 281 2027-2031 Capital Improvement Program 512
Responsible Staff Member. The City staff member identified on each project sheet as responsible for managing that project.
Right of Way / Permitting. A project phase involving the acquisition of right of way or the securing of permits necessary to proceed with a project.
Routine Upkeep. A project type involving the practice of maintaining City assets that are performing well, preventing them from dropping below a state of good repair.
S
Safety and Hazards (Plan Category, S). A Plan Category corresponding to safety and hazard mitigation goals within the Oxnard 2030 General Plan.
Special Districts. Assessments collected through Community Facilities Districts, maintenance assessment districts, and Landscape Maintenance Districts, restricted to use within the boundaries of the applicable district.
T
TBD. To Be Determined. Used where a project status has not yet been established.
TDA. Transportation Development Act. A fund source restricted to transportation related purposes.
Total Cost Estimate. The final column of each financial table, representing the full estimated cost of the project across all years shown.
Total Expenditure to End of FY 25. A field on each project sheet indicating the amount expended on the project as of the end of Fiscal Year 2025.
City Of Oxnard 282 2027-2031 Capital Improvement Program 513
Common Funding Source Codes
Project sheets identify funding sources by a numeric code and name. The funding source codes most frequently referenced in the current CIP are listed below. 101. General Fund
104. Half Cent Sales Tax, Measure O
105. Street Maintenance (IUF) Fund
118. Air Pollution Buydown Fee Fund
120. Maintenance Assessment District, LMD/CFD
181. Gas Tax Fund
185. Road Maintenance and Rehabilitation Act Fund (RMRA) 200. Federal Grants Fund
201. CDBG Fund
204. ARPA Fund
210. State and Local Grants Fund
212. Transportation Development Act (TDA) Fund
230. State Transportation Congestion Relief Fund
314. Lease Bond Revenue Fund
315. 2006 TAB HERO/SW/Ormond Fund
316. 2019A Lease Revenue Bond Fund
320. Lost Public Sector Revenue Fund
350. Development Impact Fees Fund
351. Quimby Fund
3XX. Future Bonds Fund
571. Contributions Trust Fund
601. Water Operating Fund
603. Water Development Impact Fees Fund
605. Water Capital Facility Fund
606. Water Resource Fee Fund
607. Water Bonds / WIFIA Loan Fund
609. Water Bond 2021A Revenue Bond Fund
611. Wastewater Operating Fund
613. Wastewater Connection Fee
617. Wastewater Bonds/SRF Fund
628. Wastewater Security and Contamination Prevention Fund 631. Solid Waste Operating Fund
638. Solid Waste Security and Contamination Prevention Fund 651. Golf Course Operating Fund
735. Facilities Internal Service Fund (ISF)
741. Fleet Internal Service Fund (ISF)
This glossary has been prepared as a companion reference to the City of Oxnard 2027-2031 Capital Improvement Program.
City Of Oxnard 283 2027-2031 Capital Improvement Program 514
This page left intentionally blank
City Of Oxnard 284 2027-2031 Capital Improvement Program 515
INDEX
City Of Oxnard 285 2027-2031 Capital Improvement Program 516
Index
This index lists all individual capital project sheets
appearing in the City of Oxnard 2027-2031 Capital
Improvement Program, in alphabetical order. Project
titles correspond exactly to the headings on each
project sheet. Page numbers refer to pages within this
document.
#
4th Street Mobility Improvements 157
A
Advanced Alley Maintenance
Program 158
Arterial Street Resurfacing 159
B
Bicycle & Pedestrian
Enhancements - Accessibility
Enhancements 160
Bicycle & Pedestrian Improvements
- Bard Road Corridor 161
Bicycle & Pedestrian Improvements
- Digital Signage 162
Bicycle & Pedestrian Improvements
- Oxnard Boulevard 163
Bicycle & Pedestrian Improvements
- Ventura Road Corridor 164
Bicycle & Pedestrian Improvements
- Wooley Class IV 165
Blackstock and Pleasant Valley
Estates Neighborhood Stormdrain
Improvements 166
Bridge Maintenance Citywide 167
Butler Road Stormdrain
Improvements 168
C
Cabrillo Neighborhood Park
Improvements 115
Camino del Sol Building
Improvements 71
Campus Park Activation 116
Campus Park Phase II 117
Campus Park Phase III 118
Carnegie Arts Museum Seismic
Retrofit 72
Carriage Square/Eastwood Park 119
CFD 4 Exercise Equipment
Replacement 120
City Facility Walkways
Rehabilitation 73
City Fleet Electric Vehicle (EV)
Charging Stations 169
City Hall and Annex Improvements 74
City Hall HVAC & EMS 75
Citywide Alleyway
Resurfacing/Reconstruction 170
Citywide Electrical Panels 76
Citywide HVAC Updates 77
Citywide Lighting Controls Updates 78
Citywide Playground Replacement 121
Citywide Public Parking Lot Rehab 79
Citywide Resiliency Power Systems 80
Citywide Sewer Laterals - City
Facilities 81
Citywide Sidewalk Repair 171
Citywide Streetlight Asset
Management Program 172
Civic Center West Wing Building
Improvements 82
Colonia Park Pool Repair and
Equipment Replacement 83
Corridor Median Modifications - H
Street (Vineyard Avenue to
Gonzales Road) 173
Corridor Median Modifications -
Vineyard Avenue (Oxnard
Boulevard to H Street) 174
D
Del Sol Community Garden
Activation 122
Del Sol Park Improvements - Phase
I 123
Downtown Bus Stop Improvements 175
Durley Park Improvements 124
E
East Village Park Improvements 125
Elevator Modernization - Various
City Locations 84
Endless Waves Skatepark 126
Environmental Resources: Del
Norte Facility Improvements 201
City Of Oxnard 286 2027-2031 Capital Improvement Program 517
Environmental Resources: Del
Norte Facility Tip Floor
Rehabilitation 202
Environmental Resources: Material
Recycling Facility (MRF)
Replacement 203
Environmental Resources: MRF
Roof Repair at Del Norte Facility 204
Environmental Resources: Roll up
Doors Replacement 205
Environmental Resources: Roof
Replacement - Del Norte Facility 206
Environmental Resources: Scale
House and Truck Weigh Scale
Replacement 207
Environmental Resources: Security
Improvements 208 F
Five Points Park 127
Fleet Awning Improvements 85
Fleet Improvements at the City
Yard 86
H
Hobson/Community Center Park
East 128
J
John C. Zaragoza Oxnard Transit
Center Improvements 87
K
Key Access Control Systems - City
Facilities 88
L
La Colonia Boxing Gym
Improvements 89
LMD 39/46 Playground
Replacement 129
Local Roadway Safety Plan Various
Projects - Citywide 176
M
Mandalay Bay Seawalls 153
Marina West Neighborhood Park 130
Neighborhood Street Resurfacing 177
Neptune Park Improvements 131
New At-Grade Bus Stop Boardings
& New Bus Stops 178
New Vehicle Lift Installation 90 O
Orchard Park Improvements 132
Ormond Beach Access 133
Oxnard Aquatic Center 91
Oxnard Beautification & Clean Up 134
Oxnard Dunes Neighborhood Park
Improvements 135
Oxnard Fire Station No. 2, 3 92
Oxnard Fire Station No. 4 Rebuild 93
Oxnard Fire Station No. 5 94
Oxnard Fire Stations Exterior and
Interior Painting 95
Oxnard Performing Arts Center
Seismic Study/Improvements 96
Oxnard Police Department
Facilities Planning and Feasibility
Study 97 P
Pfeiler Pocket Park Play Structure
Replacement 136
Public Restroom Improvements 98
Public Use Electric Vehicle (EV)
Charging Stations 179 R
Recycled Water: Aquifer Storage
and Recovery (ASR) / Injection
Well Field 235
Recycled Water: Aquifer Storage
and Recovery (ASR) Completion 236
Recycled Water: AWPF Expansion 237
Recycled Water: AWPF
Improvements/Upgrades 238
Recycled Water: AWPF Recycled
Water Storage Construction 239
Rice Avenue & Fifth Street Railroad
Grade Separation 180
Rio Lindo Park Improvements 137
River Ridge Golf Course Event
Space Upgrades 99
River Ridge Golf Course Roofing
Replacement and Exterior
Improvements 100
Riverpark Detention Basin
Improvements 181
Riverpark Irrigation Control System
Replacement 138
City Of Oxnard 287 2027-2031 Capital Improvement Program 518
139
140
141
101
Riverpark Playground Structures
Replacement - Children's Park and
Crescent Park
Riverpark Playground Structures
Replacement - Vineyard Park and
East Park
Riverpark Playground Structures
Replacement - Windrow Park
Roof Replacement - Various
Facilities
S
Safe Routes to School Safety and
Enhancements - Citywide (Up to 5
Schools) 182
Seabridge Playground Structures
Replacement 142
Seaview Park Improvements 143
Senior Center at 5th and Patterson 102
South Oxnard Branch Library
HVAC Renovation 103
South Oxnard Center Lighting 104
South Oxnard Library Remediation 105
Southbank Park Improvements 144
Southwinds Neighborhood Park
Improvements 145
Sports Park 146
Storm Drain Improvements
Citywide 183
Stormwater Conveyance
Improvements along Oxnard
Boulevard (Sutter Dr) 184 T
185
186
187
188
189
190
191
Traffic Signal Improvements -
Citywide (Up to 5 Intersections)
Traffic Signal Improvements -
Citywide Intersection Modifications
(Up to 9)
Traffic Signal Improvements -
Five Points Intersection
Traffic Signal Improvements -
Gonzales Road/Lantana Street
Traffic Signal Improvements -
Intelligent Transportation Systems
(ITS)
Traffic Signal Improvements -
Modernization
Traffic Signal Improvements -
Oxnard Boulevard Service Road
Traffic Signal Improvements -
Ventura Boulevard Service Road 192
Traffic Signal Improvements -
Ventura Road/2nd Street/Teal Club
Road 193
Traffic Signal Improvements -
Vineyard Avenue/H Street 194
Traffic Signal Improvements -
Wooley Road Conduit Replacement 195
Travel Demand Model 196 U
Underground of Overhead UtilitiesCitywide 209
Upgrade Citywide Radio
Infrastructure 111
US 101/Del Norte Interchange
Upgrade 197
V
Via Marina Park Renovation 147 W
Wastewater Collection: Eastern
Trunk Manhole Rehabilitation 210
Wastewater Collection: Lift Station
#24 Improvements 211
Wastewater Collection: Lift Station
#28 Improvements 212
Wastewater Collection: New Lift
Station #5 213
Wastewater Collection: Rose
Avenue Manhole Rehabilitation 214
Wastewater Collection: UPRR
Central Trunk Sewer Pipe
Replacement 215
Wastewater Collection: Ventura &
Rice Road Sewers Replacement 216
Wastewater OWTP: Digester
Improvements 217
Wastewater OWTP: Effluent Pump
Station Improvements 218
Wastewater OWTP: New Interstage
Pump Station 219
Wastewater OWTP: New
Maintenance Building 220
Wastewater OWTP: Outfall Repair 221
Wastewater OWTP: Primary
Clarifiers and Activated Sludge
Improvements 222
Wastewater OWTP: Reliability
Improvements 223
City Of Oxnard 288 2027-2031 Capital Improvement Program 519
Wastewater OWTP: Secondary
Sedimentation Tank Mechanical
Equipment Replacement 224
Wastewater WRRF: AST Blower
Starters Replacement 225
Wastewater WRRF: Cogen
Improvements 226
Wastewater WRRF: Demolition
Various Elements 227
Wastewater WRRF: Fire System
Improvements 228
Wastewater WRRF: Headworks
Improvements - Phase II 229
Wastewater WRRF: New
Administration Building 230
Wastewater WRRF: New EQ Basin 231
Wastewater WRRF: Pavement
Replacement 232
Wastewater WRRF: Stormwater
Improvements 233
Wastewater WRRF: Thickener
Improvements 234
Water Campus Ammonia Storage
Tank Replacement & Roof Repairs 240
Water Distribution: Citywide Cast
Iron
Pipe Improvements 241
Water Distribution: Hobson Park
East Neighborhood Cast Iron Pipe
Replacement 242
Water Distribution: Hueneme Road
Recycled Water Pipeline - Phase II 243
Water Distribution: Kamala Park
Neighborhood Cast Iron Pipe
Replacement 244
Water Distribution: Oxnard Conduit
Replacement 245
Water Production: Blending Station
Upgrades 246
Water Production: Groundwater
Desalter Improvement 247
Water Production: New Desalter
Storage Tank 248
Water Production: New Wells 249
Water Production: System SCADA
Improvements 250
Water Production: Well 20
Rehabilitation 251
Wilson Neighborhood Park
Improvements 148
Wilson Senior Center
Improvements 106
City Of Oxnard 289 2027-2031 Capital Improvement Program 520
FIVE YEAR CAPITAL IMPROVEMENT
PROGRAM (CIP) FOR FY 2027-2031
City Council
September 1, 2026
Morgan Kessler
City Engineer
521
RECOMMENDATION
That the City Council approve:
1. The final Five Year Capital Improvement Program for Fiscal Years 2027-2031;
2. A project budget appropriation of $1,083,733.37 from the Lease Revenue Bond Fund (314) as well as the corresponding Capital Outlay Fund (301) transfers in and appropriations in the same amount as noted in the financial impact section, for the Arterial Street Resurfacing project (C2205);
3. A project budget appropriation of $200,000 from the Mobility Development Impact Fee Fund (350, subfund 8040), and the corresponding Capital Outlay Fund (301) transfers in and appropriations in the same amount as noted in the financial impact section, for the New At-Grade Bus Stop Boardings & New Bus Stops (C2762);
2 522
RECOMMENDATION (Cont’d)
4. A project budget appropriation transfer of $7,415 from existing project Southwinds Park Bench and Trash Enclosures project (C2330) to the Southwinds Neighborhood Park Improvement project (C2725) in the 2006 TAB HERO/SW/ORMOND Fund (315), and the corresponding Capital Outlay Fund (301) transfers in and appropriations in the same amount as noted in the financial impact section; and
5. A project budget unappropriation in the amount of $600,000 from the Wastewater Operating Fund (611) consisting of $500,000.00 from the Wastewater OWTP: Digester Improvements Project (C2408) and $100,000.00 from the Wastewater WRRF: Cogen Improvements Project (C2737), and the corresponding Wastewater Capital Fund (612) transfers and unappropriations in the same amount as noted in the financial impact section.
3 523
BACKGROUND
Timeline to developing the 5-year Capital Improvement
Program (CIP) and budget
• The process followed a structured sequence
• October 2025: The CIP development cycle began
• April 2026: The Planning Commission found the CIP consistent with 2030 General Plan and the Local Coastal Plan.
• April 2026: The draft CIP was presented to the PW&TC, and changes were requested there by Committee members.
• May 2026: City Council then reprioritized, and approved, the current project List
4 524
DISCUSSION
Minor Changes Were Made Since the May City Council meeting:
1. Arterial Street Resurfacing Project (C2205): Added lease bond revenue ($1,083,733.37).
2. New At-Grade Bus Stop Boardings & New Bus Stops (C2762):
DIF-Circulation funds ($200k) are being recommended.
3. Southwinds Neighborhood Park Improvement (C2725): Add TAB funds ($7,415).
4. Remove unneeded funds from two wastewater CIP projects and return them back to WW Operations budget: (C2408) Wastewater OWTP: Digester Improvements -$500K and (C2737) Wastewater WRRF: Cogen Improvements -$100K.
5 525
DISCUSSION
CIP Book
The CIP document contains the complete set of capital projects in a 1-page per project format;
The front end of the CIP contains background and narrative information; Project pages are organized into sections: Buildings, Information Technology (IT), Parks and Open Space, Seawalls, Transportation and Drainage, and Utilities.
CIP document will be published online, and may be printed if necessary 6 526
DISCUSSION
New Changes Made to the 2027-2031 CIP Book:
• Added Project Phase table
• Added Project Status information
• Changed Functional Category legend
• Added Total Expenditures to end of FY25
• Added Operational Impact narrative
• Updated location maps
7 527
FINANCIAL IMPACT
For the City Council-approved FY 2026-27 CIP Budget, staff recommends adjusting funds as follows:
8 CIP Project Fund
FY 26-27 Adopted
CIP Budget
FY 26-27 Revised CIP
Budget
FY 26-27
Variation
FUNDING INCREASES
Arterial Street Resurfacing
Project (C2205)
Lease Bond Revenue Fund
(Fund 314) $0 $1,083,733.37 $1,083,733.37
New At-Grade Bus Stop
Boardings & New Bus Stops
(C2762)
Development Impact Fee
Fund (Fund 350, Subfund
8040) $0 $200,000 $200,000.00
Southwinds Neighborhood
Park Improvement (C2725)
2006 TAB
HERO/SW/ORMOND Fund
(Fund 315) $0 $7,415.00 $7,415.00
FUNDING DECREASES
Wastewater OWTP: Digester
Improvements (C2408)
Wastewater Operating Fund
(Fund 611) $2,500,000.00 $2,000,000.00 -$500,000.00
Wastewater WRRF: Cogen
Improvements (C2737)
Wastewater Operating Fund
(Fund 611) $1,750,000.00 $1,650,000.00 -$100,000.00
PROJECT TRANSFERS OF EXISTING FUNDING (DECREASE)
Southwinds
Bench & Trash
Enclosures (C2330)
2006 TAB
HERO/SW/ORMOND Fund
(Fund 315) -$7,415.00
528
QUESTIONS?
529
CITY COUNCIL AGENDA REPORT
REPORTS
AGENDA ITEM NO. N.3
DATE: September 1, 2026
TO: City Council
FROM: Michael Wolfe, Public Works Director, (805) 385-8055, [email protected] SUBJECT: Ratify an Emergency Order for Sewer Collection System Repairs at Hemlock Street and Patterson Road.
RECOMMENDATION
That the City Council review and ratify the following:
1. The Director of Public Works’ emergency order to dispense with public bidding requirements pursuant to Public Contract Code section 22050, to make emergency repairs to the City’s sewer collection system;
2. Authorize the City Manager to enter into any contracts required to abate the emergency conditions necessitating emergency repairs to the City’s sewer collection system on Hemlock St. and Patterson Rd; and
3. Authorize the City Manager to enter into any contracts over $220,000 that may be required to abate the emergency.
(This item did not originate in Committee.)
Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/MWG2pQ4xH5s
BACKGROUND
Oxnard City Code Section 4-30(B)(5) authorizes the Director of Public Works to order or take any directly related and immediate action required in an emergency without giving notice for bids to let contracts for a public project, in conformity with Public Contract Code section 22050.
On Wednesday, August 12, 2026, at approximately 6:30 pm the Wastewater Division was notified of a sanitary sewer overflow through two separate calls to the wastewater after-hours emergency line. Wastewater crews arrived on-site and started to evaluate the situation and to determine the cause of the blockage. It took a couple of hours to dewater the system to a point where they could identify that a manhole upstream of Lift Station 29 had partially collapsed, washing soil into the sewers and blocking the flow. The cause of the collapse is still under investigation.
Crews worked throughout the night to partially clean the sewers in an effort to restore the sewer service to minimum levels. It was decided that the full extent of the damage could only be determined if sewage flow entering the damaged manhole was stopped. This required bypass pumping across Patterson Road. Starting on Thursday night, August 13th, at approximately 9 pm Toro Enterprises installed a temporary pipe across the southbound lanes of Patterson Road for bypass pumping. By Friday morning, August 14th, the pipe was installed and 2 portable pumps were deployed. These portable pumps require 24-hour, on-site monitoring by the contractor for emergency services.
Once the bypass pumps were installed, Oxnard crews began removing the soil and debris that had washed into the sewer system, which clogged the pipe. City crews worked throughout the weekend, allowing Wastewater staff to conduct a more thorough investigation. Upon further investigation, it was determined that a considerable amount of soil had washed into the wetwell (holding tank) of the lift station, reducing the performance of the existing fixed pumps and potentially 530
causing damage to the system.
Through field visits, in-house discussions, and meetings with contractors, it was decided that bypass pumping of all flow entering the lift station is required to restore the sewers and lift station to a safe operating condition. This requires diversion of three separate sewers with portable pumps. Once all planning is in place, it is estimated that the remaining field work to abate the emergency condition can be completed in less than two weeks. All work will be conducted at night to minimize disruption due to the construction.
In addition to the work completed to date, the remaining work to fully complete the emergency repairs includes, but may not be limited to: installation of a temporary underground bypass pumping pipe in Hemlock St; setting up bypass pumping for two additional sewers; constructing a new 15-inch sewer and manhole; cleanup of the lift station wetwell; repair of two additional manholes; and restoration of the streets.
DISCUSSION
The provisions of the Purchasing Ordinance allow emergency work to proceed without competitive bidding, subject to certain requirements. Pursuant to Oxnard City Code Section 4-30 and Public Contract Code §22050, the Director of Public Works may order any emergency action required to repair or replace any public facility without adopting plans, specifications, working details, or giving notice for bids to let contracts. Such work may be performed by City Staff or a Contractor, or a combination of the two. In this case, most of the emergency repair work will be performed by a thirdparty contractor, Toro Enterprises, Inc.
The City’s Purchasing Ordinance 3053 sets forth Section 4-30 regarding Emergencies for public projects. Under the City’s updated purchasing policy, task orders for similar work are limited to $75,000. When emergency repair costs are expected to exceed that threshold, the City must proceed immediately to address the emergency, restore service(s), and protect public health and safety, but the associated agreement(s) must subsequently be brought to the City Council for ratification and approval. As a result, Council is now seeing more emergency repair items than in prior years.
To provide additional context, Wastewater Division staff reviewed the City’s current major sewer main break log for the calendar year 2023 through the present. Based on the review, the sewer system experienced the following failures:
Year Number of Sewer Main Failures
2023 0
2024 2
2025 1
2026 1 (this item)
STRATEGIC PRIORITIES
This agenda item supports the Infrastructure and Natural Resources strategy. The purpose of the Infrastructure and Natural Resources strategy is to preserve and improve our roads, utilities, parks, trees, water supply and natural resources through effective planning, prioritization, and an equitable and efficient use of available funding.
FINANCIAL IMPACT
The current rough order magnitude cost estimate to make the necessary sewer repairs at Hemlock St and Patterson Rd is approximately $300,000. Approximately $35,000 has been incurred so far installing the temporary bypass pumping pipe in Patterson Rd and deploying 2 portable sewer pumps. Additional work and/or purchases may be required to complete the project and therefore, this current cost is only a rough order magnitude estimate. This will be funded from available FY2026-27 appropriations in the Wastewater Operating Fund (6113613-53200). A final project total will be provided to the City Council.
531
COMMITTEE OUTCOME
This item did not originate in Committee per the City Council Committee Bylaws Resolution 15,851, Article II, Section D. 3. c, as this is an urgency item.
Prepared by: Jan Hauser, Wastewater Division Manager
ATTACHMENTS
1. Presentation
532
City Council
September 1, 2026
Jan Hauser,
Wastewater Division Manager
Ratify an Emergency Order for Sewer Collection
System Repairs at Hemlock St. and Patterson Rd.
533
That the City Council review and ratify the following:
1. The Director of Public Works’ emergency order to dispense with public bidding requirements pursuant to Public Contract Code section 22050, to make emergency repairs to the City’s sewer collection system;
2. Authorize the City Manager to enter into any contracts required to abate the emergency conditions necessitating emergency repairs to the City’s sewer collection system on Hemlock St. and Patterson Rd; and
3. Authorize the City Manager to enter into any contracts over $220,000 that may be required to abate the emergency.
RECOMMENDATION 2
534
The Oxnard City Code Section 4-30(B)(5) authorizes the
Director of Public Works to order or take any directly related and immediate action required in an emergency without giving notice for bids to let contracts for a public project, in conformity with Public Contract Code section 22050.
BACKGROUND 3
535
• On Wednesday, August 12, 2026, at approximately 6:30
pm the Wastewater Division was notified of a sanitary
sewer overflow
• Wastewater crews arrived on-site to evaluate the situation and to determine the cause of the blockage
• Staff worked to dewater the system to a point where they could identify that a manhole upstream of Lift Station 29 had partially collapsed, washing soil into the sewers and blocking the flow
• The cause of the collapse is still under investigation BACKGROUND 4
536
BACKGROUND 5
Collapsed Manhole
Lift Station 29
Wetwell
Hemlock St
Patterson Rd
Bypass Pumping
Temporary pipe
537
• Wastewater crews worked
overnight to dewater and
partially clean the sewer
system to restore service
levels
• Toro Enterprises installed
temporary bypass piping on
Thursday, August 13,
starting at 9 pm
• By Friday morning, two
portable pumps were
operating with 24-hour
contractor monitoring
BACKGROUND
6 538
BACKGROUND 7
Bypass pumping 539
BACKGROUND
8 • Wastewater staff worked to
remove soil and debris
from the sewer system and
continued to work through
the weekend
• Wastewater staff
determined that soil had
entered the lift station
wetwell, reducing pump
performance and creating
potential risk of system
damage
540
BACKGROUND 9
• Restoring safe operations requires bypass pumping of all flow into the lift station, including diversion of three separate sewer lines. Work is estimated to be completed in less than two weeks and will occur overnight to reduce
system impacts.
541
BACKGROUND 10
• In addition to the work completed to date, the remaining work to fully restore safe operations includes, but may not be limited to:
• Installation of a temporary underground bypass pumping pipe in Hemlock St
• Setting up bypass pumping for two additional sewers
• Constructing a new 15-inch sewer and manhole
• Cleanup of the lift station 29 wetwell
• Repair of two additional manholes
• Restoration of the streets
542
DISCUSSION 11
• The City’s Purchasing Ordinance 3053 sets forth Section 4-30 regarding Emergencies for public projects
• The Director of Public Works may order any emergency
action required to repair or replace any public facility without adopting plans, specifications, working details, or giving notice for bids to let contracts.
• Such work may be performed by City Staff or a Contractor, or a combination of the two.
• In this case, most of the emergency repair work will be performed by a third-party contractor, Toro Enterprises, Inc.
543
DISCUSSION 12
• The updated purchasing policy limits similar work task orders to $75,000 with current emergency repairs expected to exceed this amount
• The Wastewater Division has had the following sewer
system failures within the last few years:
• 2023 - 0
• 2024 - 2
• 2025 - 1
• 2026 - 1 (this item)
544
• The current rough order magnitude cost estimate to make the necessary sewer repairs at Hemlock St and Patterson Rd is approximately $300,000
• Approximately $35,000 has been incurred so far installing the temporary bypass pumping pipe in Patterson Rd and deploying 2 portable sewer pumps
• Additional work and/or purchases may be required to
complete the project and therefore, this current cost is only a rough order magnitude estimate
• This will be funded from available appropriations in Wastewater Operating fund 6113613-53200
• A final project total will be provided to the City Council.
FINANCIAL IMPACT 13