1560
")")
Little Chico Creek
SWHA-02
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legend
Project Area/Footprint
") Elderberry Shrub Locations
Swainson's Hawk Survey Points

Page 2 of 10 ends

1561
")
Little Chico Creek
SWHA-03
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legend
Project Area/Footprint
") Elderberry Shrub Locations
Swainson's Hawk Survey Points

Page 3 of 10 ends

1562
Comanche Creek
SWHA-04
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legend
Project Area/Footprint
Swainson's Hawk Survey Points

Page 4 of 10 ends

1563
Chico State
Un iversity Farm
SWHA-05
SWHA nest
4/5/21
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legen d
Project Area/Footprint
Swainson's Hawk Survey Points

Page 5 of 10 ends

1564
Glen Oaks
Mem o rial Park
SWHA-06
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legen d
Project Area/Footprint
Swainson's Hawk Survey Points

Page 6 of 10 ends

1565
SWHA-07
·|}þ99
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legend
Project Area/Footprint
Swainson's Hawk Survey Points

Page 7 of 10 ends

1566
")
Butte Creek
SWHA-08
·|}þ99
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legend
Project Area/Footprint
") Elderberry Shrub Locations
Swainson's Hawk Survey Points

Page 8 of 10 ends

1567
Butte Creek
SWHA-09
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legend
Project Area/Footprint
Swainson's Hawk Survey Points

Page 9 of 10 ends

1568
Butte Creek
SWHA-10
PATH: F:\10215320_PARADISE_WWTP_ENG_ENV \7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\BIOLOGICAL\REPORT_EIS_FIGURE_X_SWAINSONSHAWK_ELDERBERRY_POINTS.MXD - USER: SETHOMAS - DATE: 9/29/2021 0 250 500
Feet
0 50 100 150
Meters
±
SWAINSON’S HAWK SURV EY

POINTS AND LOCATIONS OF

KEY OBSERV ATIONS

PARADISE SEWER PROJECT
Service Layer Esri, HERE, Garmin, (c) OpenStreetMap contributors, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S. Department of State Humanitarian Information Unit; and NOAA National Centers for Environmental Information, U.S. Coastal Relief Model. Data refreshed May, 2020.

Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North
September 29, 2021
Legend
Project Area/Footprint
Swainson's Hawk Survey Points

Page 10 of 10 ends

1569
Attachment 3
List of Species Observed
During Surveys
1570
Paradise Sewer Project – Species Observed during Spring 2021 Field Studies PLANTS
INVASIVE = classified as an invasive species by the California Invasive Plant Council (Cal‐IPC) Abies concolor (white fir)
Acacia dealbata (silver wattle) INVASIVE: moderate
Acer macrophyllum (bigleaf maple)
Acer negundo (boxelder)
Achillea millefolium (common yarrow)
Acmispon americanus (American bird’s foot trefoil)
Aesculus californica (California buckeye)
Agrostis exarata (spike bentgrass)
Alisma triviale (northern water plantain)
Alnus rhombifolia (white alder)
Ambrosia psilostachya (ragweed)
Ammannia coccinea (purple ammannia)
Amsinckia sp. (fiddleneck sp.)
Arceuthobium campylopodum (pine mistletoe)
Arctostaphylos manzanita (common manzanita)
Arctostaphylos viscida (whiteleaf manzanita)
Aristolochia californica (California pipevine)
Artemisia douglasiana (California mugwort)
Avena sp. (oat sp.) non‐native
Blennosperma nanum (common stickyseed)
Brassica nigra (black mustard) INVASIVE: moderate
Briza maxima (big rattlesnake grass) INVASIVE: limited
Brodiaea elegans (harvest brodiaea)
Bromus diandrus (ripgut brome) INVASIVE: moderate
Bromus hordaceus (soft brome)
Calocedrus deccurens (incense cedar)
Cardamine hirsuta (hairy bittercress) non‐native
Carduus pycnocephalus (Italian thistle) INVASIVE: moderate Carex sp. (sedge sp.)
Ceanothus integerrimus (deerbrush)
Cedrus deodara (deodar cedar) non‐native
Cerastium fontanum (common chickweed) non‐native
Cercis occidentalis (western redbud)
Cercocarpus betuloides (birch leaf mountain mahogany)
Claytonia sp. (miner’s lettuce sp.)
Convulvulus arvensis (field bindweed) non‐native
Cortaderia selloana (Uruguayan pampas grass) INVASIVE: HIGH Cotoneaster pannosus (silverleaf cotoneaster) INVASIVE: moderate Crassula connata (sand pygmy weed)
Croton setiger (turkey‐mullein)
Cynodon dactylon (Bermuda grass) INVASIVE: moderate
1571
Cynoglossum grande (western houndstongue)
Cynosurus echinatus (dogtail grass) INVASIVE: moderate
Cyperus eragrostis (tall flatsedge)
Cytisus scoparius (Scotch broom) INVASIVE: HIGH
Erodium botrys (red‐stemmed filaree) non‐native
Erodium cicutarium (stork bill filaree) INVASIVE: limited Erythranthe guttata (seep monkeyflower)
Eschscholzia californica (California poppy)
Eschscholzia lobbii (frying pan poppy)
Eucalyptus camaldulensis (red gum) INVASIVE: limited
Euphorbia maculata (spotted spurge) non‐native
Festuca perennis (Italian rye grass) INVASIVE: moderate Ficus carica (common fig) INVASIVE: moderate
Fraxinus latifolia (Oregon ash)
Genista monspessulana (French broom) INVASIVE: HIGH
Geranium dissectum (cutleaf geranium) INVASIVE: limited Gilia tricolor (bird’s eyes)
Heteromeles arbutifolia (toyon)
Juglans hindsii (northern California black walnut)
Juglans regia (English walnut) non‐native
Juniperus californica (California juniper)
Lactuca seriola (prickly lettuce) non‐native
Lamium amplexicaule (giraffe head) non‐native
Lasthenia sp. (goldfields sp.)
Lepidium nitidum (shining peppergrass)
Lupinus sp. (lupine sp.)
Malva sp. (mallow sp.) non‐native
Matricaria discoidea (pineapple weed)
Medicago polymorpha (California burclover) INVASIVE: limited Medicago sativa (alfalfa) non‐native
Mentha canadensis (wild mint)
Minuartia californica (California sandwort)
Narcissus pseudonarcissus (daffodil) non‐native
Nerium oleander (oleander) non‐native
Phoenix canariensis (Canary Island date palm) INVASIVE: limited Phoradendron leucarpum (American mistletoe)
Phytolacca americana (pokeberry) INVASIVE: limited
Pinus ponderosa (ponderosa pine)
Pinus sabiniana (California foothill pine)
Plantago lanceolata (English plantain) INVASIVE: limited Platanus racemosa (California sycamore)
Polypogon monspeliensis (rabbitsfoot grass) INVASIVE: limited Populus fremontii (Fremont cottonwood)
Prunus dulcis (almond) non‐native
Pseudognaphalium beneolens (cudweed)
Pseudotsuga menziesii (Douglas fir)
Quercus berberidifolia (inland scrub oak)
Quercus douglasii (blue oak)
1572
Quercus kelloggii (California black oak)
Quercus lobata (valley oak)
Quercus wislizeni (interior live oak)
Rannunculus sp. (buttercup sp.)
Raphanus sativus (cultivated radish) INVASIVE: limited
Robinia pseudoacacia (black locust) INVASIVE: limited
Rubus armeniacus (Himalayan blackberry) INVASIVE: HIGH
Rumex crispus (curly dock) INVASIVE: limited
Salix sp. (willow sp.)
Sambucus nigra (black elderberry)
Sedella pumila (Sierra mock stonecrop)
Senecio vulgaris (common groundsel) non‐native
Torilis arvensis (hedge parsley)
Toxicodendron diversilobum (poison oak)
Trifolium sp. (clover sp.)
Triphysaria eriantha (butter ‘n’ eggs)
Typha latifolia (broadleaf cattail)
Umbellularia californica (California bay laurel)
Verbascum thapsus (woolly mullein) INVASIVE: limited
Vitis californica (California wild grape)
Washingtonia robusta (Mexican fan palm) INVASIVE: moderate

INVERTEBRATES
Pipevine swallowtail (Battus philenor)
Western tiger swallowtail (Papilio rutulus)
West Coast lady (Vanessa annabella)
Mourning cloak (Nymphalis antiopa)

AMPHIBIANS
Pacific chorus frog (Pseudacris sierrae)
American bullfrog (Lithobates catesbeianus) non‐native

REPTILES
Western pond turtle (Emys marmorata) California Species of Special Concern “Northern Pacific” western rattlesnake (Crotalus oreganus oreganus) FISH
Chinook salmon ‐ Central Valley spring‐run ESU (Oncorhynchus tshawytcha pop. 11) Federal Threatened / State Threatened
BIRDS
Greater white‐fronted goose (Anser albifrons) flyover
Snow goose (Chen caerulescens) flyover
1573
Ross’s goose (Chen rossii) flyover
Canada goose (Branta canadensis)
Wood duck (Aix sponsa)
Mallard (Anas platyrhynchos)
American wigeon (Mareca americana)
Common merganser (Mergus merganser)
California quail (Calipepla californica)
Wild turkey (Meleagris gallopavo)
Double‐crested cormorant (Phalacrocorax auritus) CDFW Watch List (for colonies only) White‐faced ibis (Plegadis chihi) CDFW Watch List (for colonies only) ‐ flyover Turkey vulture (Cathertes aura)
Osprey (Pandion haliaetus) CDFW Watch List
Northern harrier (Circus hudsonius) California Species of Special Concern Cooper’s hawk (Accipiter cooperii) CDFW Watch List
Sharp‐shinned hawk (Accipiter striatus) CDFW Watch List (nesting only) project not in nesting range Red‐shouldered hawk (Buteo lineatus)
Red‐tailed hawk (Buteo jamaicensis)
Swainson’s hawk (Buteo swainsoni) State Threatened
Ferruginous hawk (Buteo regalis) USFWS Bird of Conservation Concern, CDFW Watch List Bald eagle (Haliaeetus leucocephalus) USFWS Bird of Conservation Concern, State Endangered (pair was likely nesting at Butte Creek Canyon Ecological Preserve) Greater sandhill crane (Antigone canadensis tabida) CA Threatened, CA Fully Protected (flyover) Killdeer (Charadrius vociferus)
Spotted sandpiper (Actitis macularius)
Rock pigeon (Columba livia) non‐native
Eurasian collared‐dove (Streptopelia decaocto) non‐native Mourning dove (Zenaida macroura)
Great horned owl (Bubo virginianus)
Belted kingfisher (Megaceryle alcyon)
Anna’s hummingbird (Calypte anna)
Acorn woodpecker (Melanerpes formicivorus)
Nuttall’s woodpecker (Dryobates nuttallii)
Downy woodpecker (Dryobates pubescens)
Hairy woodpecker (Dryobates villosus)
Northern flicker (Colaptes auratus)
American kestrel (Falco sparverius)
Prairie falcon (Falco mexicanus) USFWS Bird of Conservation Concern, CDFW Watch List Black phoebe (Sayornis nigricans)
Ash‐throated flycatcher (Myiarchus cinerascens)
Western kingbird (Tyrannus verticalis)
California scrub‐jay (Aphelocoma californica)
Yellow‐billed magpie (Pica nuttalli) USFWS Bird of Conservation Concern American crow (Corvus brachyrhychos)
Common raven (Corvus corax)
Tree swallow (Tachycineta bicolor)
Violet‐green swallow (Tachycineta thalassina)
Northern rough‐winged swallow (Stelgidopteryx serripennis) Cliff swallow (Petrochelidon pyrrhonata)
1574
Barn swallow (Hirundo rustica)
Oak titmouse (Baeolophus inornatus)
Bushtit (Psaltriparus minimus)
White‐breasted nuthatch (Sitta carolinensis)
Brown creeper (Certhia americana)
Bewick’s wren (Thryomanes bewickii)
House wren (Troglodytes aedon)
Ruby‐crowned kinglet (Regulus calendula)
Western bluebird (Sialia mexicana)
Hermit thrush (Catharus guttatus)
American robin (Turdus migratorius)
Northern mockingbird (Mimus polyglottos)
European starling (Sturnus vulgaris) non‐native
Cedar waxwing (Bombycilla cedrorum)
Phainopepla (Phainopepla nitens)
Yellow‐rumped warbler (Setophaga coronata)
Black‐throated gray warbler (Setophaga nigrescens)
Spotted towhee (Pipilo maculatus)
California towhee (Melozone crissalis)
Savannah sparrow (Passerculus sandwichensis)
Song sparrow (Melospiza melodia)
Lincoln’s sparrow (Melospiza lincolnii)
“Oregon” junco (Junco hyemalis)
White‐crowned sparrow (Zonotrichia leucophrys)
Golden‐crowned sparrow (Zonotrichia atricapilla)
Lark sparrow (Chondestes grammacus)
Western tanager (Piranga ludoviciana)
Black‐headed grosbeak (Pheucticus melanocephalus)
Brewer’s blackbird (Euphagus cyanocephalus)
Brown‐headed cowbird (Molothrus ater)
Western meadowlark (Sturnella neglecta)
Bullock’s oriole (Icterus bullockii)
Cassin’s finch (Haemorhous cassinii)
Purple finch (Haemorhous purpureus)
House finch (Haemorhous mexicanus)
Pine siskin (Spinus pinus)
Lesser goldfinch (Spinus psaltria)
American goldfinch (Spinus tristis)
House sparrow (Passer domesticus) non‐native

MAMMALS
Western gray squirrel (Sciurus griseus)
California ground squirrel (Otospermophilus beecheyi)
Botta’s pocket gopher (Thomomys bottae)
Coyote (Canis latrans)
Mule deer (Odocoileus hemionus)
1575
G
Tribal Consultation
1576
Sacred Lands File & Native American Contacts List Request Native American Heritage Commission
1550 Harbor Blvd, Suite 100
West Sacramento, CA 95691
916-373-3710
916-373-5471 – Fax
[email protected]
Information Below is Required for a Sacred Lands File Search Project: ______________________________________________________________________ County:______________________________________________________________________ USGS Quadrangle Name:_______________________________________________________ Company/Firm/Agency:_________________________________________________________ Street Address:________________________________________________________________ City:______________________________________________ Zip:______________________ Phone:_____________________________________________
Fax:_______________________________________________
Email:_____________________________________________
Project Description:

Paradise Sewer Project
Butte
Chico, Ords Ferry, Paradise East, Paradise West
Town of Paradise
5555 Skyway
Paradise 95969
530-872-6291
n/a
[email protected]
The Town of Paradise (Town) is implementing the Paradise Sewer Project (Project), which involves identifying and implementing a long-term solution for collection, treatment, and reuse/disposal of its wastewater. The Project area currently includes the Town itself for wastewater treatment service and the length of Skyway Road extending westward, crossing Highway 99 into the southwest area of Chico onto Rancho de Farwell land for the effluent alignment corridor.

Township Range Section(s)
21N 1E 1, 2, 10, 11, 12, 15
21N 2E 1, 2, 3, 4, 5, 6, 7, 8
22N 1E 36
22N 2E 25, 31, 35, 36
22N 3E 1, 2, 10, 11, 12, 13, 14, 15, 20, 21, 22, 23, 24, 26, 27, 29, 30, 31 and parts of Rancho de Farwell
1577
KonKow Valley Band of Maidu
Jessica Lopez, Chairperson
8998 Fruitridge Road
Sacramento, CA, 95803
Phone: (530) 777 - 8094
[email protected]
KonKow
Maidu
Mechoopda Indian Tribe
Dennis Ramirez, Chairperson
125 Mission Ranch Blvd
Chico, CA, 95926
Phone: (530) 899 - 8922
Fax: (530) 899-8517
[email protected]
KonKow
Maidu
Mooretown Rancheria of Maidu
Indians
Guy Taylor,
#1 Alverda Drive
Oroville, CA, 95966
Phone: (530) 533 - 3625
KonKow
Maidu
Mooretown Rancheria of Maidu
Indians
Benjamin Clark, Chairperson
#1 Alverda Drive
Oroville, CA, 95966
Phone: (530) 533 - 3625
Fax: (530) 533-3680
[email protected]
KonKow
Maidu
1 of 1
This list is current only as of the date of this document. Distribution of this list does not relieve any person of statutory responsibility as defined in Section 7050.5 of the Health and Safety Code, Section 5097.94 of the Public Resource Section 5097.98 of the Public Resources Code.

This list is only applicable for contacting local Native Americans with regard to cultural resources assessment for the proposed Paradise Sewer Project, Butte County.

PROJ-2021-
002274
04/27/2021 10:40 AM
Native American Heritage Commission
Native American Contact List
Butte County
4/27/2021
1578
April 27, 2021
Monica Ruth
Town of Paradise / HDR Inc.

Via Email to:[email protected]; [email protected] Re: Paradise Sewer Project, Butte County
Dear Ms. Ruth:

A record search of the Native American Heritage Commission (NAHC) Sacred Lands File (SLF) was completed for the information you have submitted for the above referenced project. The results were negative. However, the absence of specific site information in the SLF does not indicate the absence of cultural resources in any project area. Other sources of cultural resources should also be contacted for information regarding known and recorded sites.

Attached is a list of Native American tribes who may also have knowledge of cultural resources in the project area. This list should provide a starting place in locating areas of potential adverse impact within the proposed project area. I suggest you contact all of those indicated; if they cannot supply information, they might recommend others with specific knowledge. By contacting all those listed, your organization will be better able to respond to claims of failure to consult with the appropriate tribe. If a response has not been received within two weeks of notification, the Commission requests that you follow-up with a telephone call or email to ensure that the project information has been received.

If you receive notification of change of addresses and phone numbers from tribes, please notify me. With your assistance, we can assure that our lists contain current information.

If you have any questions or need additional information, please contact me at my email address: [email protected].

Sincerely,
Nancy Gonzalez-Lopez
Cultural Resources Analyst
Attachment

CHAIRPERSON
Laura Miranda
Luiseño

VICE CHAIRPERSON
Reginald Pagaling
Chumash

SECRETARY
Merri Lopez-Keifer
Luiseño

PARLIAMENTARIAN
Russell Attebery
Karuk

COMMISSIONER
[Vacant]

COMMISSIONER
William Mungary
Paiute/White Mountain
Apache

COMMISSIONER
[Vacant]

COMMISSIONER
Julie TumamaitStenslie
Chumash

COMMISSIONER
[Vacant]

EXECUTIVE SECRETARY
Christina Snider
Pomo

NAHC HEADQUARTERS
1550 Harbor Boulevard
Suite 100
West Sacramento,
California 95691
(916) 373-3710
[email protected]
NAHC.ca.gov
1579
U1
U1
c(J
c(J
..
, CERTIFIED MAIL® RECEIPT
Domestic Mail Only
PS Form 3800, April 2015 PSN 7530--02.:_000-9047 See Reverse for Instructions U.S. Postal Service'.,
CERTIFIED MAIL® RECEIPT
Domestic Mail Only c(J
::r
cQ
cQ
['- OFFICIA ~ Certified Mall Fee i i60' D ~$;.._~--~~~~-,.,..,...~........,~=-1 Extra Serv ces & Fees /ch<>ck box. add'"" '2,.ap~ t•J 0 Return Receipt (haldoopy) $ 1 ' .--9 0 Return Receipt (electronic) $ -----
~ 0 Certified Mall Restricted Dellve<y $ -~/ --'"----
□ Adult Signature Required $ -~---
0 Adult Signature Restricted Delivery $ 1 N
PS Form 3800, April 2015 PSN7530-02-000-9047 See Reverse for Instructions . . vice
CERTIFIED MAIL® RECEIPT
Domestic Mail Only
PS Form 38(!_0, April 2015 PSN 7530-02-000-9047 See Reverse for Instructions U.S. Postal Service"·'
CERTIFIED MAIL® RECEIPT
Domestic Mail Only ,
For delivery information, visit our website at www.usps.com"'. ~ :;::;:na~~~~§eoUJMYIBZ- ---------~:.~-~----------------- £'- ciry.s'isie;zrP+4• -------------------------------------------------------------------- PS Form 3800, April 2015 PSN 7530-02-000-9047 See Reverse for Instructions 1580
May 10, 2021
Via Certified Mail
Jessica Lopez
Chairperson
KonKow Valley Band of Maidu
8998 Fruitridge Road
Sacramento, CA 95803
Subject: Notice of Opportunity to Consult Under Assembly Bill 52 for the Paradise Sewer Project in Butte County, California
Honorable Chairperson Lopez,
The Town of Paradise (Town), as the Lead Agency for the Paradise Sewer Project (Proposed Project), is providing this notice of opportunity to request notification from the Town for consultation regarding the Proposed Project pursuant to Public Resources Code (PRC) section 21080.3.1 and Chapter 532, Statutes of 2014 (i.e., AB 52).

Since its incorporation in 1979, the Town has sought a formal wastewater treatment solution for the community, with service for commercial and densely populated residential areas being a priority. Failed and failing septic systems create the potential for public health and environmental concerns and have limited economic growth. Prior to the Camp Fire, which almost completely destroyed the town in 2018, Paradise was the largest unsewered community in California. A new wastewater management solution is needed to improve the local economy (e.g., encourage opening of new businesses) and reduce the potential for public health and environmental concerns caused by failed or failing septic systems.

The objectives of the Proposed Project are as follows:
• Provide a sewer system to serve Paradise in compliance with the Town of Paradise 1994 General Plan policies LUO-10, ESP-6, LUP-16, and LUI-7 (Quad Consultants 2008). • Provide long-term, efficient, reliable, high quality treatment of wastewater in a cost-effective, environmentally beneficial manner to the people of Paradise. • Improve the handling of wastewater in Paradise to address the economic and environmental concerns of the current system.
• Connect to the existing Chico Water Pollution Control Plant (WPCP) to provide efficient regional treatment of wastewater with no additional cost to City of Chico rate payers. 1581
Existing Facilities
Wastewater treatment facilities in Paradise consist of individual, privately owned septic tanks and soil absorption disposal systems known as leach fields, together with several engineered subsurface disposal systems serving commercial and institutional facilities. Businesses and residences near the future sewer system continue to rely on septic tanks and leach field systems for wastewater treatment and disposal.

The Proposed Project consists of three constructed components—a wastewater collection system in Paradise, an 18-mile export pipeline to convey wastewater to the Chico WPCP, and connection to the WPCP—and operation of the new sewer system. The export pipeline would begin at the southwest edge of Paradise and run for approximately 8 miles along Skyway until reaching south Chico, at which point the pipeline would leave Skyway and continue west, crossing Butte Creek, Highway 99, and the Union Pacific Railroad, and terminating at the Chico WPCP in Chico. The Proposed Project would not change the service area of the Chico WPCP other than the addition of the Paradise connection and treatment.

Moreover, there would be no additional fees for Chico residents and rate payers as a result of the Proposed Project.

Sewer Service Area
The sewer service area (SSA) would serve approximately 1,500 parcels (out of the 11,000 total parcels in Paradise) along the Skyway, Clark Road, and Pearson Road corridors. The SSA also would serve most businesses in Paradise and would enable future construction of affordable multi-family housing, which is limited because of multiple septic system constraints such as high groundwater, poor soils, and limited parcel sizes.

At the time of initial operation, an estimated 360 occupied parcels within the SSA would be generating an average wastewater flow of 109,000 gpd. It is estimated that it could take 30 years for the entire SSA to be occupied, at which time the average wastewater flow would be 448,000 gpd. The Town is considering this level of development and wastewater flow in planning its wastewater treatment solutions.

Collection System
The collection system would serve all parcels within the SSA, and would consist of a system of gravity sewers, small pump stations, and force mains. This collection system would enable properties within the SSA to have existing septic tanks and leach line systems abandoned altogether and would remove future onsite wastewater treatment and dispersal requirements. Because of the varied topography within the SSA, a number of pump stations and pressurized force mains would be required to pump flows out of valleys and swales, and back up to an adjacent gravity sewer. The collection system would consist of approximately 157,000 feet of 2- to 4-inch-diameter force mains, 29,000 feet of 8-inchdiameter gravity trunk lines, and 28 pump stations, all within public right-of-way. The gravity sewers would come together at the southwest edge of town, on Skyway, where they would transition to the export pipeline to the Chico WPCP.
1582
Export Pipeline
The proposed export pipeline would start along Skyway at the south end of the Paradise collection system and would continue southwest along Skyway. Near Chico, at the bend where Skyway turns north, the pipeline would continue west, heading cross-country with crossings of Butte Creek and Highway 99 until reaching Midway, and would proceed into Chico and end at the Chico WPCP. The connection to the Chico WPCP is not associated with other ongoing facility upgrades. Figure 1 of Attachment A shows the proposed export pipeline route and connection to the Chico WPCP.

Consultation
At this time, the Town is seeking to consult with California Native American tribes that are traditionally and culturally affiliated with the Proposed Project area, in compliance with CEQA, California Public Resources Code (PRC) section 21080.3.1. The Town has requested the assistance of the Native American Heritage Commission (NAHC), in compliance with PRC 21080.3.1(c) to provide a list of California Native American tribes that are traditionally and culturally affiliated with the Proposed Project area. The NAHC has provided a list of California Native American tribes in support of these efforts, and the Town is reaching out to each of the contacts provided.

The Town would like to take this opportunity to notify the KonKow Valley Band of Maidu of an opportunity to consult with SSWD regarding the potential for this Proposed Project to impact tribal cultural resources, as defined in PRC section 21074. The purposes of tribal consultation under Section 21080.3.1 is to determine, as part of the CEQA review process, whether tribal cultural resources are present within the Proposed Project area, and if so, whether the Proposed Project will significantly impact those resources. If tribal cultural resources may be significantly impacted, then consultation will also help to determine the most appropriate way to avoid or mitigate those impacts.

In accordance with Section 21080.3.1(d) of the PRC, please respond within 30 days from the receipt of this letter to either request or decline consultation in writing for this Project. Please send your written response to:

John “Jay” Lloyd, Senior Cultural Resources Specialist
HDR Engineering, Inc.
2379 Gateway Oaks Drive, Suite 200
Sacramento, CA 95833
[email protected]
916.679.8715
If you have any concerns regarding cultural resources and/or tribal cultural resources within the Project area shown on the enclosed map, or if you have any concerns regarding issues related to the overall Proposed Project, please contact me using the contact information provided below. 1583
Thank you and we look forward to your response.

Sincerely,
Marc Mattox
Town of Paradise Director of Public Works
5555 Skyway
Paradise, CA 95969
530-872-6291
[email protected]
Attachment: A: Proposed Project Map
)
1584
Notice of Opportunity to Consult for the Paradise Sewer Project in Butte County, California Attachment A
Proposed Project Map
1585
1586
Figure 1. Proposed Project Map
..
--~.~~ ~
~ "~ ~ ~,,
"°~~:-~:,. CHICO -~~ ~~,
':~-,
~ ~
~'-:
~" "':
~
Town of Paradise
Boundary
\ \"( ':~:, ..
\:i f' I,
\\
Project L cation ....._
(
Chiro""II Paradise ~t,..,OC.lr/Q,
N.:4 "ffliil
,., " •0-o'-ille
v
Sit..rr a ~ev:ada
Mountain,s
- Proposed Skyway Pipeline Alignment
- Sewer Service Area
- Butte Creek Canyon Ecological Reserve
-- Freeway
--Arterial
-+- Railroad
Rivers and Creeks
\1\/aterbodies
City Boundaries
'==i County Boundary
Service Laye , S ou, ces: Es1i, HERE, Garmin, USG S, lnte,map, INCREMENT P, NRCan, Es ,i Japan, METI, Es1i China (Hong Kong), Es ri Ko,ea, Esri (Thailand), N GCC, (c) OpenSheetMap contributo,s, and the GIS User Community
Map information was compiled flom the bes:t available sources:. No wairanty is made for its acc u,acy or completeness.

Projection: NAD 1983 California State Plane Zone 2 ft
0 0

MAP OF PROPOSED PROJECT

PARADISE SEWER PROJECT
FIGURE 1 April 2021
1-)~
2 4 N
2 4
Miles
A Kilometers
6 1587
May 10, 2021
Via Certified Mail
Dennis Ramirez
Chairperson
Mechoopda Indian Tribe
125 Mission Ranch Blvd
Chico, CA 95926
Subject: Notice of Opportunity to Consult Under Assembly Bill 52 for the Paradise Sewer Project in Butte County, California
Honorable Chairperson Ramirez,
The Town of Paradise (Town), as the Lead Agency for the Paradise Sewer Project (Proposed Project), is providing this notice of opportunity to request notification from the Town for consultation regarding the Proposed Project pursuant to Public Resources Code (PRC) section 21080.3.1 and Chapter 532, Statutes of 2014 (i.e., AB 52).

Since its incorporation in 1979, the Town has sought a formal wastewater treatment solution for the community, with service for commercial and densely populated residential areas being a priority. Failed and failing septic systems create the potential for public health and environmental concerns and have limited economic growth. Prior to the Camp Fire, which almost completely destroyed the town in 2018, Paradise was the largest unsewered community in California. A new wastewater management solution is needed to improve the local economy (e.g., encourage opening of new businesses) and reduce the potential for public health and environmental concerns caused by failed or failing septic systems.

The objectives of the Proposed Project are as follows:
• Provide a sewer system to serve Paradise in compliance with the Town of Paradise 1994 General Plan policies LUO-10, ESP-6, LUP-16, and LUI-7 (Quad Consultants 2008). • Provide long-term, efficient, reliable, high quality treatment of wastewater in a cost-effective, environmentally beneficial manner to the people of Paradise. • Improve the handling of wastewater in Paradise to address the economic and environmental concerns of the current system.
• Connect to the existing Chico Water Pollution Control Plant (WPCP) to provide efficient regional treatment of wastewater with no additional cost to City of Chico rate payers. 1588
Existing Facilities
Wastewater treatment facilities in Paradise consist of individual, privately owned septic tanks and soil absorption disposal systems known as leach fields, together with several engineered subsurface disposal systems serving commercial and institutional facilities. Businesses and residences near the future sewer system continue to rely on septic tanks and leach field systems for wastewater treatment and disposal.

The Proposed Project consists of three constructed components—a wastewater collection system in Paradise, an 18-mile export pipeline to convey wastewater to the Chico WPCP, and connection to the WPCP—and operation of the new sewersystem. The export pipeline would begin at the southwest edge of Paradise and run for approximately 8 miles along Skyway until reaching south Chico, at which point the pipeline would leave Skyway and continue west, crossing Butte Creek, Highway 99, and the Union Pacific Railroad, and terminating at the Chico WPCP in Chico. The Proposed Project would not change the service area of the Chico WPCP other than the addition of the Paradise connection and treatment.

Moreover, there would be no additional fees for Chico residents and rate payers as a result of the Proposed Project.

Sewer Service Area
The sewer service area (SSA) would serve approximately 1,500 parcels (out of the 11,000 total parcels in Paradise) along the Skyway, Clark Road, and Pearson Road corridors. The SSA also would serve most businesses in Paradise and would enable future construction of affordable multi-family housing, which is limited because of multiple septic system constraints such as high groundwater, poor soils, and limited parcel sizes.

At the time of initial operation, an estimated 360 occupied parcels within the SSA would be generating an average wastewater flow of 109,000 gpd. It is estimated that it could take 30 years for the entire SSA to be occupied, at which time the average wastewater flow would be 448,000 gpd. The Town is considering this level of development and wastewater flow in planning its wastewater treatment solutions.

Collection System
The collection system would serve all parcels within the SSA, and would consist of a system of gravity sewers, small pump stations, and force mains. This collection system would enable properties within the SSA to have existing septic tanks and leach line systems abandoned altogether and would remove future onsite wastewater treatment and dispersal requirements. Because of the varied topography within the SSA, a number of pump stations and pressurized force mains would be required to pump flows out of valleys and swales, and back up to an adjacent gravity sewer. The collection system would consist of approximately 157,000 feet of 2- to 4-inch-diameter force mains, 29,000 feet of 8-inchdiameter gravity trunk lines, and 28 pump stations, all within public right-of-way. The gravity sewers would come together at the southwest edge of town, on Skyway, where they would transition to the export pipeline to the Chico WPCP.
1589
Export Pipeline
The proposed export pipeline would start along Skyway at the south end of the Paradise collection system and would continue southwest along Skyway. Near Chico, at the bend where Skyway turns north, the pipeline would continue west, heading cross-country with crossings of Butte Creek and Highway 99 until reaching Midway, and would proceed into Chico and end at the Chico WPCP. The connection to the Chico WPCP is not associated with other ongoing facility upgrades. Figure 1 of Attachment A shows the proposed export pipeline route and connection to the Chico WPCP.

Consultation
At this time, the Town is seeking to consult with California Native American tribes that are traditionally and culturally affiliated with the Proposed Project area, in compliance with CEQA, California Public Resources Code (PRC) section 21080.3.1. The Town has requested the assistance of the Native American Heritage Commission (NAHC), in compliance with PRC 21080.3.1(c) to provide a list of California Native American tribes that are traditionally and culturally affiliated with the Proposed Project area. The NAHC has provided a list of California Native American tribes in support of these efforts, and the Town is reaching out to each of the contacts provided.

The Town would like to take this opportunity to notify the Mechoopda Indian Tribe of an opportunity to consult with SSWD regarding the potential for this Proposed Project to impact tribal cultural resources, as defined in PRC section 21074. The purposes of tribal consultation under Section 21080.3.1 is to determine, as part of the CEQA review process, whether tribal cultural resources are present within the Proposed Project area, and if so, whether the Proposed Project will significantly impact those resources. If tribal cultural resources may be significantly impacted, then consultation will also help to determine the most appropriate way to avoid or mitigate those impacts.

In accordance with Section 21080.3.1(d) of the PRC, please respond within 30 days from the receipt of this letter to either request or decline consultation in writing for this Project. Please send your written response to:

John “Jay” Lloyd, Senior Cultural Resources Specialist
HDR Engineering, Inc.
2379 Gateway Oaks Drive, Suite 200
Sacramento, CA 95833
[email protected]
916.679.8715
If you have any concerns regarding cultural resources and/or tribal cultural resources within the Project area shown on the enclosed map, or if you have any concerns regarding issues related to the overall Proposed Project, please contact me using the contact information provided below. 1590
Thank you and we look forward to your response.

Sincerely,
Marc Mattox
Town of Paradise Director of Public Works
5555 Skyway
Paradise, CA 95969
530-872-6291
[email protected]
Attachment: A: Proposed Project Map
1591
Notice of Opportunity to Consult for the Paradise Sewer Project in Butte County, California Attachment A
Proposed Project Map
1592
1593
Figure 1. Proposed Project Map
..
--~.~~ ~
~ "~ ~ ~,,
"°~~:-~:,. CHICO -~~ ~~,
':~-,
~ ~
~'-:
~" "':
~
Town of Paradise
Boundary
\ \"( ':~:, ..
\:i f' I,
\\
Project L cation ....._
(
Chiro""II Paradise ~t,..,OC.lr/Q,
N.:4 "ffliil
,., " •0-o'-ille
v
Sit..rr a ~ev:ada
Mountain,s
- Proposed Skyway Pipeline Alignment
- Sewer Service Area
- Butte Creek Canyon Ecological Reserve
-- Freeway
--Arterial
-+- Railroad
Rivers and Creeks
\1\/aterbodies
City Boundaries
'==i County Boundary
Service Laye , S ou, ces: Es1i, HERE, Garmin, USG S, lnte,map, INCREMENT P, NRCan, Es ,i Japan, METI, Es1i China (Hong Kong), Es ri Ko,ea, Esri (Thailand), N GCC, (c) OpenSheetMap contributo,s, and the GIS User Community
Map information was compiled flom the bes:t available sources:. No wairanty is made for its acc u,acy or completeness.

Projection: NAD 1983 California State Plane Zone 2 ft
0 0

MAP OF PROPOSED PROJECT

PARADISE SEWER PROJECT
FIGURE 1 April 2021
1-)~
2 4 N
2 4
Miles
A Kilometers
6 1594
May 10, 2021
Via Certified Mail
Benjamin Clark
Chairperson
Mooretown Rancheria of Maidu Indians
#1 Alverda Drive
Oroville, CA, 95966
Subject: Notice of Opportunity to Consult Under Assembly Bill 52 for the Paradise Sewer Project in Butte County, California
Honorable Chairperson Clark,
The Town of Paradise (Town), as the Lead Agency for the Paradise Sewer Project (Proposed Project), is providing this notice of opportunity to request notification from the Town for consultation regarding the Proposed Project pursuant to Public Resources Code (PRC) section 21080.3.1 and Chapter 532, Statutes of 2014 (i.e., AB 52).

Since its incorporation in 1979, the Town has sought a formal wastewater treatment solution for the community, with service for commercial and densely populated residential areas being a priority. Failed and failing septic systems create the potential for public health and environmental concerns and have limited economic growth. Prior to the Camp Fire, which almost completely destroyed the town in 2018, Paradise was the largest unsewered community in California. A new wastewater management solution is needed to improve the local economy (e.g., encourage opening of new businesses) and reduce the potential for public health and environmental concerns caused by failed or failing septic systems.

The objectives of the Proposed Project are as follows:
• Provide a sewer system to serve Paradise in compliance with the Town of Paradise 1994 General Plan policies LUO-10, ESP-6, LUP-16, and LUI-7 (Quad Consultants 2008). • Provide long-term, efficient, reliable, high quality treatment of wastewater in a cost-effective, environmentally beneficial manner to the people of Paradise. • Improve the handling of wastewater in Paradise to address the economic and environmental concerns of the current system.
• Connect to the existing Chico Water Pollution Control Plant (WPCP) to provide efficient regional treatment of wastewater with no additional cost to City of Chico rate payers. 1595
Existing Facilities
Wastewater treatment facilities in Paradise consist of individual, privately owned septic tanks and soil absorption disposal systems known as leach fields, together with several engineered subsurface disposal systems serving commercial and institutional facilities. Businesses and residences near the future sewer system continue to rely on septic tanks and leach field systems for wastewater treatment and disposal.

The Proposed Project consists of three constructed components—a wastewater collection system in Paradise, an 18-mile export pipeline to convey wastewater to the Chico WPCP, and connection to the WPCP—and operation of the new sewer system. The export pipeline would begin at the southwest edge of Paradise and run for approximately 8 miles along Skyway until reaching south Chico, at which point the pipeline would leave Skyway and continue west, crossing Butte Creek, Highway 99, and the Union Pacific Railroad, and terminating at the Chico WPCP in Chico. The Proposed Project would not change the service area of the Chico WPCP other than the addition of the Paradise connection and treatment.

Moreover, there would be no additional fees for Chico residents and rate payers as a result of the Proposed Project.

Sewer Service Area
The sewer service area (SSA) would serve approximately 1,500 parcels (out of the 11,000 total parcels in Paradise) along the Skyway, Clark Road, and Pearson Road corridors. The SSA also would serve most businesses in Paradise and would enable future construction of affordable multi-family housing, which is limited because of multiple septic system constraints such as high groundwater, poor soils, and limited parcel sizes.

At the time of initial operation, an estimated 360 occupied parcels within the SSA would be generating an average wastewater flow of 109,000 gpd. It is estimated that it could take 30 years for the entire SSA to be occupied, at which time the average wastewater flow would be 448,000 gpd. The Town is considering this level of development and wastewater flow in planning its wastewater treatment solutions.

Collection System
The collection system would serve all parcels within the SSA, and would consist of a system of gravity sewers, small pump stations, and force mains. This collection system would enable properties within the SSA to have existing septic tanks and leach line systems abandoned altogether and would remove future onsite wastewater treatment and dispersal requirements. Because of the varied topography within the SSA, a number of pump stations and pressurized force mains would be required to pump flows out of valleys and swales, and back up to an adjacent gravity sewer. The collection system would consist of approximately 157,000 feet of 2- to 4-inch-diameter force mains, 29,000 feet of 8-inchdiameter gravity trunk lines, and 28 pump stations, all within public right-of-way. The gravity sewers would come together at the southwest edge of town, on Skyway, where they would transition to the export pipeline to the Chico WPCP.
1596
Export Pipeline
The proposed export pipeline would start along Skyway at the south end of the Paradise collection system and would continue southwest along Skyway. Near Chico, at the bend where Skyway turns north, the pipeline would continue west, heading cross-country with crossings of Butte Creek and Highway 99 until reaching Midway, and would proceed into Chico and end at the Chico WPCP. The connection to the Chico WPCP is not associated with other ongoing facility upgrades. Figure 1 of Attachment A shows the proposed export pipeline route and connection to the Chico WPCP.

Consultation
At this time, the Town is seeking to consult with California Native American tribes that are traditionally and culturally affiliated with the Proposed Project area, in compliance with CEQA, California Public Resources Code (PRC) section 21080.3.1. The Town has requested the assistance of the Native American Heritage Commission (NAHC), in compliance with PRC 21080.3.1(c) to provide a list of California Native American tribes that are traditionally and culturally affiliated with the Proposed Project area. The NAHC has provided a list of California Native American tribes in support of these efforts, and the Town is reaching out to each of the contacts provided.

The Town would like to take this opportunity to notify the Mooretown Rancheria of Maidu Indians of an opportunity to consult with SSWD regarding the potential for this Proposed Project to impact tribal cultural resources, as defined in PRC section 21074. The purposes of tribal consultation under Section 21080.3.1 is to determine, as part of the CEQA review process, whether tribal cultural resources are present within the Proposed Project area, and if so, whether the Proposed Project will significantly impact those resources. If tribal cultural resources may be significantly impacted, then consultation will also help to determine the most appropriate way to avoid or mitigate those impacts.

In accordance with Section 21080.3.1(d) of the PRC, please respond within 30 days from the receipt of this letter to either request or decline consultation in writing for this Project. Please send your written response to:

John “Jay” Lloyd, Senior Cultural Resources Specialist
HDR Engineering, Inc.
2379 Gateway Oaks Drive, Suite 200
Sacramento, CA 95833
[email protected]
916.679.8715
If you have any concerns regarding cultural resources and/or tribal cultural resources within the Project area shown on the enclosed map, or if you have any concerns regarding issues related to the overall Proposed Project, please contact me using the contact information provided below. 1597
Thank you and we look forward to your response.

Sincerely,
Marc Mattox
Town of Paradise Director of Public Works
5555 Skyway
Paradise, CA 95969
530-872-6291
[email protected]
Attachment: A: Proposed Project Map
1598
Notice of Opportunity to Consult for the Paradise Sewer Project in Butte County, California Attachment A
Proposed Project Map
1599
1600
Figure 1. Proposed Project Map
..
--~.~~ ~
~ "~ ~ ~,,
"°~~:-~:,. CHICO -~~ ~~,
':~-,
~ ~
~'-:
~" "':
~
Town of Paradise
Boundary
\ \"( ':~:, ..
\:i f' I,
\\
Project L cation ....._
(
Chiro""II Paradise ~t,..,OC.lr/Q,
N.:4 "ffliil
,., " •0-o'-ille
v
Sit..rr a ~ev:ada
Mountain,s
- Proposed Skyway Pipeline Alignment
- Sewer Service Area
- Butte Creek Canyon Ecological Reserve
-- Freeway
--Arterial
-+- Railroad
Rivers and Creeks
\1\/aterbodies
City Boundaries
'==i County Boundary
Service Laye , S ou, ces: Es1i, HERE, Garmin, USG S, lnte,map, INCREMENT P, NRCan, Es ,i Japan, METI, Es1i China (Hong Kong), Es ri Ko,ea, Esri (Thailand), N GCC, (c) OpenSheetMap contributo,s, and the GIS User Community
Map information was compiled flom the bes:t available sources:. No wairanty is made for its acc u,acy or completeness.

Projection: NAD 1983 California State Plane Zone 2 ft
0 0

MAP OF PROPOSED PROJECT

PARADISE SEWER PROJECT
FIGURE 1 April 2021
1-)~
2 4 N
2 4
Miles
A Kilometers
6 1601
May 10, 2021
Via Certified Mail
Guy Taylor
Director, Environmental Protection Office
Mooretown Rancheria of Maidu Indians
#1 Alverda Drive
Oroville, CA, 95966
Subject: Notice of Opportunity to Consult Under Assembly Bill 52 for the Paradise Sewer Project in Butte County, California
Dear Director Taylor,
The Town of Paradise (Town), as the Lead Agency for the Paradise Sewer Project (Proposed Project), is providing this notice of opportunity to request notification from the Town for consultation regarding the Proposed Project pursuant to Public Resources Code (PRC) section 21080.3.1 and Chapter 532, Statutes of 2014 (i.e., AB 52).

Since its incorporation in 1979, the Town has sought a formal wastewater treatment solution for the community, with service for commercial and densely populated residential areas being a priority. Failed and failing septic systems create the potential for public health and environmental concerns and have limited economic growth. Prior to the Camp Fire, which almost completely destroyed the town in 2018, Paradise was the largest unsewered community in California. A new wastewater management solution is needed to improve the local economy (e.g., encourage opening of new businesses) and reduce the potential for public health and environmental concerns caused by failed or failing septic systems.

The objectives of the Proposed Project are as follows:
• Provide a sewer system to serve Paradise in compliance with the Town of Paradise 1994 General Plan policies LUO-10, ESP-6, LUP-16, and LUI-7 (Quad Consultants 2008). • Provide long-term, efficient, reliable, high quality treatment of wastewater in a cost-effective, environmentally beneficial manner to the people of Paradise. • Improve the handling of wastewater in Paradise to address the economic and environmental concerns of the current system.
• Connect to the existing Chico Water Pollution Control Plant (WPCP) to provide efficient regional treatment of wastewater with no additional cost to City of Chico rate payers. 1602
Existing Facilities
Wastewater treatment facilities in Paradise consist of individual, privately owned septic tanks and soil absorption disposal systems known as leach fields, together with several engineered subsurface disposal systems serving commercial and institutional facilities. Businesses and residences near the future sewer system continue to rely on septic tanks and leach field systems for wastewater treatment and disposal.

The Proposed Project consists of three constructed components—a wastewater collection system in Paradise, an 18-mile export pipeline to convey wastewater to the Chico WPCP, and connection to the WPCP—and operation of the new sewer system. The export pipeline would begin at the southwest edge of Paradise and run for approximately 8 miles along Skyway until reaching south Chico, at which point the pipeline would leave Skyway and continue west, crossing Butte Creek, Highway 99, and the Union Pacific Railroad, and terminating at the Chico WPCP in Chico. The Proposed Project would not change the service area of the Chico WPCP other than the addition of the Paradise connection and treatment.

Moreover, there would be no additional fees for Chico residents and rate payers as a result of the Proposed Project.

Sewer Service Area
The sewer service area (SSA) would serve approximately 1,500 parcels (out of the 11,000 total parcels in Paradise) along the Skyway, Clark Road, and Pearson Road corridors. The SSA also would serve most businesses in Paradise and would enable future construction of affordable multi-family housing, which is limited because of multiple septic system constraints such as high groundwater, poor soils, and limited parcel sizes.

At the time of initial operation, an estimated 360 occupied parcels within the SSA would be generating an average wastewater flow of 109,000 gpd. It is estimated that it could take 30 years for the entire SSA to be occupied, at which time the average wastewater flow would be 448,000 gpd. The Town is considering this level of development and wastewater flow in planning its wastewater treatment solutions.

Collection System
The collection system would serve all parcels within the SSA, and would consist of a system of gravity sewers, small pump stations, and force mains. This collection system would enable properties within the SSA to have existing septic tanks and leach line systems abandoned altogether and would remove future onsite wastewater treatment and dispersal requirements. Because of the varied topography within the SSA, a number of pump stations and pressurized force mains would be required to pump flows out of valleys and swales, and back up to an adjacent gravity sewer. The collection system would consist of approximately 157,000 feet of 2- to 4-inch-diameter force mains, 29,000 feet of 8-inchdiameter gravity trunk lines, and 28 pump stations, all within public right-of-way. The gravity sewers would come together at the southwest edge of town, on Skyway, where they would transition to the export pipeline to the Chico WPCP.
1603
Export Pipeline
The proposed export pipeline would start along Skyway at the south end of the Paradise collection system and would continue southwest along Skyway. Near Chico, at the bend where Skyway turns north, the pipeline would continue west, heading cross-country with crossings of Butte Creek and Highway 99 until reaching Midway, and would proceed into Chico and end at the Chico WPCP. The connection to the Chico WPCP is not associated with other ongoing facility upgrades. Figure 1 of Attachment A shows the proposed export pipeline route and connection to the Chico WPCP.

Consultation
At this time, the Town is seeking to consult with California Native American tribes that are traditionally and culturally affiliated with the Proposed Project area, in compliance with CEQA, California Public Resources Code (PRC) section 21080.3.1. The Town has requested the assistance of the Native American Heritage Commission (NAHC), in compliance with PRC 21080.3.1(c) to provide a list of California Native American tribes that are traditionally and culturally affiliated with the Proposed Project area. The NAHC has provided a list of California Native American tribes in support of these efforts, and the Town is reaching out to each of the contacts provided.

The Town would like to take this opportunity to notify the Mooretown Rancheria of Maidu Indians of an opportunity to consult with SSWD regarding the potential for this Proposed Project to impact tribal cultural resources, as defined in PRC section 21074. The purposes of tribal consultation under Section 21080.3.1 is to determine, as part of the CEQA review process, whether tribal cultural resources are present within the Proposed Project area, and if so, whether the Proposed Project will significantly impact those resources. If tribal cultural resources may be significantly impacted, then consultation will also help to determine the most appropriate way to avoid or mitigate those impacts.

In accordance with Section 21080.3.1(d) of the PRC, please respond within 30 days from the receipt of this letter to either request or decline consultation in writing for this Project. Please send your written response to:

John “Jay” Lloyd, Senior Cultural Resources Specialist
HDR Engineering, Inc.
2379 Gateway Oaks Drive, Suite 200
Sacramento, CA 95833
[email protected]
916.679.8715
If you have any concerns regarding cultural resources and/or tribal cultural resources within the Project area shown on the enclosed map, or if you have any concerns regarding issues related to the overall Proposed Project, please contact me using the contact information provided below. 1604
Thank you and we look forward to your response.

Sincerely,
Marc Mattox
Town of Paradise Director of Public Works
5555 Skyway
Paradise, CA 95969
530-872-6291
[email protected]
Attachment: A: Proposed Project Map
)
1605
Notice of Opportunity to Consult for the Paradise Sewer Project in Butte County, California Attachment A
Proposed Project Map
1606
1607
Figure 1. Proposed Project Map
..
--~.~~ ~
~ "~ ~ ~,,
"°~~:-~:,. CHICO -~~ ~~,
':~-,
~ ~
~'-:
~" "':
~
Town of Paradise
Boundary
\ \"( ':~:, ..
\:i f' I,
\\
Project L cation ....._
(
Chiro""II Paradise ~t,..,OC.lr/Q,
N.:4 "ffliil
,., " •0-o'-ille
v
Sit..rr a ~ev:ada
Mountain,s
- Proposed Skyway Pipeline Alignment
- Sewer Service Area
- Butte Creek Canyon Ecological Reserve
-- Freeway
--Arterial
-+- Railroad
Rivers and Creeks
\1\/aterbodies
City Boundaries
'==i County Boundary
Service Laye , S ou, ces: Es1i, HERE, Garmin, USG S, lnte,map, INCREMENT P, NRCan, Es ,i Japan, METI, Es1i China (Hong Kong), Es ri Ko,ea, Esri (Thailand), N GCC, (c) OpenSheetMap contributo,s, and the GIS User Community
Map information was compiled flom the bes:t available sources:. No wairanty is made for its acc u,acy or completeness.

Projection: NAD 1983 California State Plane Zone 2 ft
0 0

MAP OF PROPOSED PROJECT

PARADISE SEWER PROJECT
FIGURE 1 April 2021
1-)~
2 4 N
2 4
Miles
A Kilometers
6 1608
I
SENDER: COMPLETE THIS SECTION
■ Complete items 1, 2, and 3.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
1 .drti,...lo Arfrircc:c:ca.ri tn·
Dennis Ramirez, Chairperson
Mechoopda Indian Tribe
125 Mission Ranch Blvd
Chico, CA 95926
II I IIIIII IIII Ill I Ill lllllllll I 1111 111111111111 9590 9402 4991 9063 8056 44
□ Agent
□ Addressee
C. Date of Delivery
-\1...-1..

D. Is delivery address different from item 1? D Yes
If YES, enter delivery address below: :la.No

3. Service Type □ Adult Signature
□ Adult Signature Restricted Delivery
□ Certified Mail®
□ Certified Mail R~ cted Deliverv
D Priority Mail Express®
□ Registered Mail"' □ Registered Mail Restricted Delivery D Re tum Receipt for :chandise
SENDER: COMPLETE THIS SECTION
■ Complete Items 1, 2, and 3.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front if space permits.

1. Article Addressed to:

Benjamin Clark, Chairperson
M ooretown Rancheria of Maidu Indians
#1 Alverda Drive
Orov ille, CA, 95966
111 IIIIII IIII Ill I Ill lllllllll I 11 11111 111111111 9590 9402 4991 9063 8056 68
~gent
□ Addressee
C. Date of Delivery
D. Is delivery address different from item 1? D Yes If YES, enter delivery address below: :::Q-.No

3. Service Type □ Adult Signature
□ Adult Signature Restricted Delivery
□ Certified Mail®
□ Certified Mail Reslricted Delivery
□ Collect on Delivery
□ Priority Mail Express®
D Registered Mail™
□ R8l)lstered Mail Restricte< Delivery
D Return Receipt for Merchandise
I ,., I nature Confirmation™ I ,ature Confirmation I :tricted Delivery -2-. -.. -.. -,r-,o-.-1,-,m-h_o_,-m-,.,,-n-e-,o-, .,.,,-~m-e-on-,.,..;r_o_/o_h_o-,--11 ----~□ Collect on Delivery Restricted Delivery □ Signature Confirmatlonr" □ Signature Confirmation
Restricted Delivery 7019 0140 0001 0117 8855 Restricted Delivery ., __ I , PS I ~vu ,.,~tic Return Receipt I PS Form 3811, July 2015 PSN 7530-02-000-9053 Domestic Return Receipt r
' '
SENDER: COMPLETE THIS SECTION
■ Complete Items 1, 2, and 3.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front if space permits.

1. Article Addressed to:

Guy Taylor, Director
Environmental Protection Office
M ooretown Rancheria of Maidu Indians
#1 Alverda Drive
Oroville, CA, 95966
II IIIIIII IIII Ill llll lllllllll I 1111111111111111
9590 9402 4991 9063 8056 75
D. Is delivery address different from item 1? □ Yes
If YES, enter delivery address below: :>c::( No
SENDER: COMPLETE THIS SECTION
■ Complete items 1, 2, and 3.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front if space permits.

1. Article Addressed to:

Jessica Lopez, Chairperson
KonKow Valley Band of Maidu
8998 Fruitridge Road
Sacrament o, CA 95803

COMPLETE THIS SECTION ON DELIVERY
A. Signature
□ Agent
, ~ D Addressee
B. Received by (Printed Nam~~f Delivery
D. Is delivery address different from item 1? D Yes
If YES, enter delivery address below: □ No
g ~~::i:i:r: R~ricted Delivery B =:~:=i~~:r~:::cted II I IIIIII IIII Ill I Ill 1111111111111111111 1111111 g :]~::i:i::l: Restricted Delivery □ Certified Mail® Delivery □ Certified Mail® □ Priority Mail Express®
□ Registered Mail™
□ R8l)IS!ered Mail Restricted Delivery
D Certified Mall Restricted Delivery D Return Receipt for 9590 9402 4991 9063 8056 51 D Certified Mail Restricted Delivery -:::----:-::--:--:-:-----:----:::----:--:------,--------1 □ Collect on Delivery Merchandise □ Collect on Delivery 2 ,. . ..1.! _ , _ .. , . __ ._ --- ..-r ........... , ...... ,1.,,.. ...... -...... ,;,..,.,. ,~1-.a.1' □ Collect on Delivery Restricted Delivery D Signature Confirmation™ I J - ,,- ,.,-.. -,r-,o- .-,,-,m-h_o_, -m-,.,,-n-ol-o-, -,,n-m_o_on-,-;r_o_b_h_n,-1 ------l □ Collect on Delivery Restricted Delivery D Return Receipt for Merchandise
□ Signature Confirmation™
7 0 19 0 14 0 I D Signature Confirmation I I Mail 0 D D 1 0 11 7 8 8 4 8 I Restricted Delivery Restricted Delivery 7 0 19 0 1 4 0 0 0 0 1 0 11 7 8 8 6 2 I Mail Restrtcted Delivery ~;:-;::=:--;:;.n:.:.:-:--::-:-:-==-------..L...=~.;.;;:..--------- ----- ,-·-· .500) PS Form 3811, July 2015 PSN 7530-02-000-9053 Domestic Return Receipt 1 : PS Form 3811 , July 2015 PSN 7530-02-000-9053 □ Signature Confirmation
Restricted Delivery
Domestic Return Receipt
1609
Agenda
Project: Paradise Sewer Project in Butte County, California Subject: AB 52 Consultation Meeting
Date: Tuesday, August 10, 2021; 1:30 pm
Location: Meeting held via WebEx
Invitees: Jessica Lopez, Konkow Valley Band of Maidu, Tribal Chair Kyle McHenry, Mechoopda Indian Tribe, Tribal Historic Preservation Officer Marc Mattox, Town of Paradise, Public Works Director/Town Engineer John Buttz, HDR, Project Manager
Leslie Tice, HDR, CEQA Project Lead
Jay Lloyd, HDR, Senior Cultural Resources Specialist
Monica Ruth, HDR, Cultural Resources Specialist
I. Welcome/Introductions
II. Project Overview
A. Sewer Service Area
B. Collection System
C. Export Pipeline
III. CEQA/AB 52 Consultation Discussion
A. The purposes of tribal consultation under Section 21080.3.1 (aka AB 52) is to determine, as part of the CEQA review process, whether tribal cultural resources are present within the Proposed Project area, and if so, whether the Proposed Project will significantly impact those resources. If tribal cultural resources may be significantly impacted, then consultation will also help to determine the most appropriate way to avoid or mitigate those impacts.

IV. Review Action Items
V. Conclusion
1610
Agenda
Project: Paradise Sewer Project in Butte County, California Subject: AB 52 Consultation Meeting
Date: Thursday, September 09, 2021; 11:00 am
Location: Meeting held via WebEx
Invitees: Jessica Lopez, Konkow Valley Band of Maidu, Tribal Chair Matthew Gramps-Williford, Konkow Valley Band of Maidu, Tribal Historic Preservation Officer Kyle McHenry, Mechoopda Indian Tribe, Tribal Historic Preservation Officer Marc Mattox, Town of Paradise, Public Works Director/Town Engineer John Buttz, HDR, Project Manager
Leslie Tice, HDR, CEQA Project Lead
Jay Lloyd, HDR, Senior Cultural Resources Specialist
Monica Ruth, HDR, Cultural Resources Specialist
I. Welcome
II. Review of Action Items from 8/10/21 Meeting
• HDR to provide GIS data (shapefiles) of the project area (inclusive of service area and export pipeline) to both the Konkow Valley Band of Maidu and Mechoopda Indian Tribe o Minutes and shapefiles were provided via One Drive/email on 8/16/2021 • The Town of Paradise/HDR will reach out again to both the Konkow Valley Band of Maidu and Mechoopda Indian Tribe in three weeks (early September) to set up a time to discuss items of concern following the Tribes’ review of their respective internal databases/information against the GIS data; meeting to possibly take place the week following Labor Day.

III. CEQA/AB 52 Consultation Discussion
A. Known Tribal Cultural Resources
B. Areas/resources of concern
C. Proposed Mitigation Measures
IV. Review Action Items, as applicable
V. Conclusion
1611
From: Ruth, Monica
To: "Jessica Lopez"; Om Yepi; K McHenry
Cc: Stanley, Ashley; Mattox, Marc; Buttz, John; Edwards, Dawn Subject: Paradise Sewer Project update, request for review Date: Thursday, April 7, 2022 2:34:41 PM
Attachments: REPORT_EIS_EIS_FIGURE_X_Deleted_Alternatives.pdf Greetings Chairwoman Lopez, Cultural Resource Director Williford, and THPO McHenry – The Town of Paradise has asked HDR to relay a Sewer Project update to you. We have adjusted the pipeline alignment of the Proposed Project in the south part of Chico, on the west side of Highway 99 (see attached figure). We would like your input regarding potential impacts to Tribal Cultural Resources caused by this change. The attached figure is marked up so you can compare the new proposed pipeline alignment to the previously-proposed alignment.

The proposed export pipeline crossing of Hwy 99 has been updated to eliminate two alternatives west of the trenchless crossing of Hwy 99: the Southgate Ave-McFadden Lane-Midway alternative and the Norfield Ave-Midway alternative. The proposed export pipeline will now follow Entler Avenue to Midway with two options for trenchless crossing at Hwy 99: either at the northeast end of Norfield Avenue (the teal dashed line shown in the attached figure) or at the northeast end of Southgate Ave (the orange dotted line in the attached). The change was based in part on feedback we received from you through the AB52 consultation process and the Town anticipates that the potential for impacts from the new Entler Ave-Midway route will be less than the previous Southgate Ave-McFadden Lane-Midway and the Norfield Ave-Midway alternatives.

The Town would like to know if you have any concerns or questions about these changes, and if these changes would result in a change to potential impacts to Tribal Cultural Resources. I’m available to discuss on the phone and can set up calls/meetings with the Town if that is preferred.

Please let me know how you would like to proceed.

Thank you,
Monica
Monica Ruth, M.A. (she/her)
Ethnohistorian and Ethnographer
HDR
Mobile: 916-813-3060
[email protected]
hdrinc.com/follow-us
1612
Dea d
S
Horse
lo u gh
Little Bu tt e Creek
Bi g
C h ico Cree k
Rock Creek
Mu d Cr
Cave Creek
Mud C re ek
Sy c amore Cre e k
Grizzly Creek
Gold Ru n
Du rham Sl ou g h
Little Ch ico Creek
S heep
H ollow
Ho n e y R u n
Ha mlin
Sl ou g h
Middle B u tte Creek
Little Dry
Cree k
Kusa l Slo u gh
West Bran c h Clear Creek
Nugen Creek
An gel S lo u gh
Keefer
Slou g h
Butte Creek
Little Dry Creek
Hamlin Slough
WB Feather River
Little Dry
Cree k
Sacramento River
Little Chico Creek
Comanche Creek
Chico WPCP
Town of Paradise
Boundary
CHICO
CHICO
Detail B Detail A
·|þ}99 149 ·|þ}
·|99þ}
·|þ}70
CLARK
RD
HWY 70

DAYTON RD
WB HWY 70
SR 32 HWY

CHICO RIVER RD

ELLIOTT RD

CLARK RD

BILLE RD

PEARSON RD

ESPLANADE

CHICO AVE

NEW SKYWAY

NEAL RD

CROUCH AVE

OROVILLE CHICO HWY
HWY 70

HEGAN LN

PENTZ RD
NORD AVE (ST HWY 32)
EB HWY 70
MIDWAY
STATE HWY 32
ST HWY 32

ELK AVE

RIVER RD
SKYWAY PATH: F:\10215320_PARADISE_WWTP_ENG_ENV\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\EIR_EIS\REPORT\REPORT_EIS_EIS_FIGURE_X_DELETED_ALTERNATIVES.MXD - USER: SETHOMAS - DATE: 3/18/2022 0 2 4
Miles
0 2 4 6
Kilometers
±

UPDATED PROPOSED PROJECT

AND DELETED ALTERNATIVES

PARADISE SEWER PROJECT
Service Layer Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
Map information was compiled from the best available sources. No warranty is made for its accuracy or completeness.

Projection is NAD 1983 UTM Zone 10 North

ENTLER AVE

NORFIELD AVE

MCFADDEN LN

SOUTHGATE AVE
MIDWAY
·|}þ99
Comanche
Creek
Little Chico Cr

CHICO RIVER RD

CHICO RIVER RD

CROUCH AVE

TAFFEE AVE

CHICO AVE
Detail A - Crouch Ave Alternative
Detail B - Deleted Alternatives
^_
!
!
!
Oroville
Yuba City
Sacramento
Chico Paradise S i e r r a N e v a d a
M o u n t a i n s
Project
Location
FEBRUARY 2022
Proposed Export Pipeline System
Alignment
Core Collection System
Extended Collection System
City Boundaries
Butte Creek Canyon Ecological
Reserve
Waterbodies
Rivers and Creeks
Freeway
Arterial Road
Railroad
Deleted Alternative
1 t
., - r
L
r ~
1111 .. ... r--1 \ L..- I
I
I 1111
Ii
-
iJ
1613
H
Pump Station Energy
Consumption Calculation
1614
Page Intentionally Blank
1615
Location QTY. BY ESTIMATE LEVEL
L. Edwards CONCEPT
Limits QTY. CHCK PRICED BY
M.Massaro L.Edwards
AGENCY
19-216 TO1 Town of Paradise 12/12/2021
Pumpstation Energy Consumption Calculation
Town of Paradise
Paradise - Sewer Feasibility Alternative A - Regional Skyway Town of Paradise - Collection System
Proposed Paradise Sewer Service Area
BEN|EN PROJECT NO.
1616
System kWH/yr
Collection PS 254761
Trunk PS 241696
Regional PS 104517
Total 600975
1617
Pump Station Name Q gal/day Q CFS
Q with Peaking Factor
gal/min Jensen Pump Series kWH/yr
PS-CONNIE 5035.55 0.0078 10.49 248 13065
PS-CENTER 2144.68 0.0033 4.47 248 13065
PS-CAPE COD 11090.90 0.0172 23.11 248 13065
PS-MEMORIAL 2093.14 0.0032 4.36 248 13065
PS-PINE GROVE 18678.59 0.0289 38.91 248 13065
PS-EWALD 900.70 0.0014 1.88 248 13065
PS-BUSCHMANN 12393.50 0.0215 25.82 248 13065
PS-E ELLIOTT 1650.20 0.0026 3.44 248 13065
PS-NUNNLEY 33172.43 0.0513 69.11 360 19597
PS-E NUNNLEY 417.33 0.0006 0.87 248 13065
PS-BLACK OLIVE 17547.14 0.0295 36.56 248 13065
PS-PHEASANT 2070.93 0.0032 4.31 248 13065
PS-WILDWOOD 3829.00 0.0059 7.98 248 13065
PS-STONERIDGE 19891.95 0.0308 41.44 248 13065
PS-BOWLES 1310.39 0.0020 2.73 248 13065
PS-E CLARK 10173.16 0.0157 21.19 248 13065
PS-EASY 3631.87 0.0056 7.57 248 13065
PS-WOODBROOK 8562.44 0.0132 17.84 248 13065
PS-CENTRAL PARK 15969.42 0.0247 33.27 248 13065
Total 254761
Peaking Factor 3.00
1618
Pump Station
Name
Q (Gal/Day)
into PS Q CFS into PS
Q with
Peaking
Factor
gal/min into
PS
Jensen
Pump
Series kWH/yr
S1-PS-1 6336.86 0.01 13.20 248 13065
E1-PS-2 8.00 0.00 0.02 248 13065
C1-PS-1 10694.72 0.02 22.28 248 13065
E1-PS-1 32386.02 0.05 67.47 360 19597
C1-PS-2 181583.41 0.28 378.30 696 45726
P1-PS-2 256581.50 0.40 534.54 696 45726
P1-PS-3 199412.42 0.31 415.44 696 45726
P1-PS-1 273317.12 0.42 569.41 696 45726
Total 241696
Peaking
Factor 3
1619
Pump Station
Name
Q CFS into
PS Q gal/day
Q with
Peaking
Factor
gal/min
Jensen
Pump
Series kWH/yr
Regional PS-1 1.18 488054.62 1016.78 896 52259
Regional PS-2 1.18 488054.62 1016.78 896 52259
total 104517
Peaking Factor 3
1620
Flow Range PS Series
Wet Well
ID feet Hp kW Time Hour/year kWH/yr
10 to 50 gpm 248 4 10 7.457 20% 1752.00 13064.66
100 to 180 gpm 360 5 15 11.1855 20% 1752.00 19597.00
180 to 300 gpm 472 6 25 18.6425 20% 1752.00 32661.66
350 to 750 gpm 696 8 35 26.0995 20% 1752.00 45726.32
400 to 1250 gpm 896 8 40 29.828 20% 1752.00 52258.66
615 to 1955 gpm 10120 10 45 33.5565 20% 1752.00 58790.99 1621
I
Responses to
Comment Letters
Received during Public
Review of Draft PEIR
1622
I Responses to Comment Letters Received during
Public Review of Draft PEIR
I.1 Introduction
This Final Environmental Impact Report (FEIR) was prepared in accordance with the California Environmental Quality Act (CEQA) (Cal. Pub. Res. Code Section 21000, et seq.) and State CEQA Guidelines (Cal. Code Regs. Section 15000, et seq.). The Town of Paradise is the lead agency for the environmental review of the proposed Paradise Sewer Project and has the principal responsibility for approving the project. This Final PEIR assesses the expected environmental impacts resulting from the adoption and implementation of the proposed project and responds to public comments received on the Draft EIR.

The following sections contain
1) a review of CEQA Guidelines pertinent to public comments and responses, 2) a matrix of all letters and corresponding Town responses, and 3) copies of the original comment letters.

In two cases, comments received on the Draft PEIR prompted the addition of text to the final version of the document i.e., the Final PEIR. These changes are shown in bold format in the Final EIR. No deletions were made as a result of public comments. Small grammatical or punctuation changes that were made are not specifically called out (e.g., adding a period at end of sentence, fixing misspellings). No changes were made to the Draft PEIR appendices (App. A – H); however this appendix (Appendix I) is a new attachment to the Final PEIR.

The Final EIR also includes informational updates and clarifications. Beyond the requirements set by CEQA and relevant court cases discussed below, every attempt has been made to respond to comments that address the project in general, in an effort to provide the most complete information possible.

I.2 Responsibilities of the Town
CEQA Guidelines Section 15088(b) requires that responses be made to only those comments that are specific to the Draft EIR. In addition, in the court case Browning-Ferris Industries of California, Inc. v. San Jose 181 Cal. App. 3d 852 (1986), the court stated that the Lead Agency must respond to all significant environmental comments in a level of detail commensurate with that of the comment, citing Gallegos v. California Board of Forestry 76 Cal. App. 3d 945 (1978), Twain Harte Homeowners Association v. County of Tuolumne 128 Cal. App. 3d 664 (1982), and Cleary v. County of Stanislaus 118 Cal. App. 3d 348 (1981). Following are additional Lead Agency responsibilities as described in CEQA Guidelines (Section 15088):
• (a) “The lead agency shall evaluate comments on environmental issues received from persons who reviewed the draft EIR and shall prepare a written response. The Lead Agency 1623
shall respond to comments raising significant environmental issues received during the noticed comment period and any extensions and may respond to late comments” (15088(a)) • (b) “The lead agency shall provide a written proposed response, either in a printed copy or in an electronic format, to a public agency on comments made by that public agency at least 10 days prior to certifying an environmental impact report” (15088 (b)). • (c) “The written response shall describe the disposition of significant environmental issues raised (e.g., revisions to the proposed project to mitigate anticipated impacts or objections).

In particular, the major environmental issues raised when the Lead Agency‘s position is at variance with recommendations and objections raised in the comments must be addressed in detail giving reasons why specific comments and suggestions were not accepted. There must be good faith, reasoned analysis in response. Conclusory statements unsupported by factual information will not suffice. The level of detail contained in the response, however, may correspond to the level of detail provided in the comment (i.e., responses to general comments may be general). A general response may be appropriate when a comment does not contain or specifically refer to readily available information, or does not explain the relevance of evidence submitted with the comment” (15088(c)). • (d) “The response to comments may take the form of a revision to the draft EIR or may be a separate section in the final EIR. Where the response to comments makes important changes in the information contained in the text of the draft EIR, the Lead Agency should either:
1) Revise the text in the body of the EIR, or
2) Include marginal notes showing that the information is revised in the response to comments (15088(d)).

Finally, “if any public agency or person who is consulted with regard to an EIR or Negative Declaration fails to comment within a reasonable time as specified by the Lead Agency, it shall be assumed, without a request for a specific extension of time, that such agency or person has no comment to make. Although the Lead Agency need not respond to late comments, the Lead Agency may choose to respond to them” (CEQA Guidelines Section 15207).

The Town’s responses to each comment on the Draft PEIR represent a good-faith, reasoned effort to address the environmental issues identified by the comments. Accordingly, Town staff’s and its consultants’ final analysis provided in the responses to comments are backed by substantial evidence. Likewise, the Town’s legal counsel prepared and/or independently reviewed responses to the Draft PEIR comments.

I.3 Responsibilities of the Commenter
CEQA Guidelines Section 15132(d) requires that the Final EIR consist of the responses of the Lead Agency to significant environmental points raised in the review and consultation process. In addition, CEQA Guidelines Sections 15201 and 15204 discuss public participation regarding the review and evaluation of EIRs. Specifically, Section 15204 states the following:
• “(a) In reviewing draft EIRs, persons and public agencies should focus on the sufficiency of the document in identifying and analyzing the possible impacts on the environment and ways in which the significant effects of the project might be avoided or mitigated. Comments are most helpful when they suggest additional specific alternatives or mitigation measures that 1624
would provide better ways to avoid or mitigate the significant environmental effects. At the same time, reviewers should be aware that the adequacy of an EIR is determined in terms of what is reasonably feasible, in light of factors such as the magnitude of the project at issue, the severity of its likely environmental impacts, and the geographic scope of the project.

CEQA does not require a lead agency to conduct every test or perform all research, study, and experimentation recommended or demanded by commentors. When responding to comments, lead agencies need only respond to significant environmental issues and do not need to provide all information requested by reviewers, as long as a good faith effort at full disclosure is made in the EIR” (15204 (a)).
• “(c) Reviewers should explain the basis for their comments, and should submit data or references offering facts, reasonable assumptions based on facts, or expert opinion supported by facts in support of the comments. Pursuant to [CEQA Guidelines] Section 15064, an effect shall not be considered significant in the absence of substantial evidence” (15204 (c)).
• “(d) Reviewing agencies or organizations should include with their comments the name of a contact person who would be available for later consultation if necessary. Each responsible agency and trustee agency shall focus its comments on environmental information germane to that agency’s statutory responsibility (15204 (d)).
• (e) This section shall not be used to restrict the ability of reviewers to comment on the general adequacy of a document or of the lead agency to reject comments not focused as recommended by this section (15204 (e)).
• “(f) Prior to the close of the public review period for an EIR or mitigated negative declaration, a responsible or trustee agency which has identified significant effects on the environment may submit to the lead agency proposed mitigation measures which would address those significant effects. Any such measures shall be limited to impacts affecting those resources that are subject to the statutory authority of that agency. If mitigation measures are submitted, the responsible or trustee agency shall either submit to the lead agency complete and detailed performance objectives for the mitigation measures, or shall refer the lead agency to appropriate, readily available guidelines or reference documents which meet the same purpose” (15204 (f)).

Table I-1 lists those persons, organizations, and public agencies that provided written comments on the Draft PEIR. The assigned comment letter number, letter date, letter author and affiliation with a particular organization, if presented in the comment letter or if representing a public agency, is also listed. Letter numbers beginning with “W” were received on the Paradise website, while letter numbers beginning with “L” were received by email or mail post. Format for reference to specific comments in the matrix is: Letter number-Comment number (e.g., W1-1 is referencing the first letter and the first comment in that letter).

TABLE I-1 Public Agencies, Organizations, and Persons that Commented on Draft PEIR Letter Number / Number of
Comments
Date Commentor Affiliation
W1/1 July 17, 2022 Alice Patterson Citizen
W2/1 July 25, 2022 Linda Barton Citizen
1625
Letter Number / Number of
Comments
Date Commentor Affiliation
L1/1 July 27, 2022 Kristen Way,
Environmental
Scientist
State Water
Resources Control
Board
W3/1 July 28, 2022 Kat Carlisle Citizen
W4/1 August 1, 2022 Earl Eckert Citizen
W5/1 August 2, 2022 Pam Galloway Citizen
W6/7 August 3, 2022 Brian Anderson Citizen
W7/1 August 5, 2022 Ivan Garcia Citizen
W8/1 August 5, 2022 Joe Rees Citizen
W9/4 August 8, 2022 Rick Hoddinott Citizen
L2/1 August 8, 2022 Vicki Taylor Citizen
L3/1 August 8, 2022 Anonymous Citizen
L4/1 August 8, 2022 Tod Kimmelshue Citizen
W10/1 August 10, 2022 Ronald Lassonde Citizen
W11/1 August 10, 2022 Mandi McKay Citizen
L5/1 August 10, 2022 Richard Smith Citizen
W12/1 August 11, 2022 Andrew D’Lugos Citizen
W13/1 August 11, 2022 Kirk Monfort Citizen
W14/1 August 15, 2022 Richard Stone Citizen
W15/1 August 16, 2022 Joseph Mount Citizen
W16/6 August 22, 2022 Brian Anderson Citizen
W17/8 August 22, 2022 Steven Cismowski Citizen
W18/1 August 22, 2022 Ryan Duncanwood Citizen
W19/1 August 22, 2022 Bud Linggi Citizen
W20/1 August 22, 2022 Diane Pajouh Citizen
W21/1 August 22, 2022 Mike Petersen Citizen
W22/1 August 22, 2022 Michael Schwartz Citizen
W23/4 August 22, 2022 Gary Wolt Citizen
1626
Letter Number / Number of
Comments
Date Commentor Affiliation
W24/1 August 23, 2022 Matthew Carlson Citizen
W25/1 August 23, 2022 Tony Catalano Citizen
W26/1 August 23, 2022 Rob Williams Citizen
W27/1 August 24, 2022 Kevin Baxter Citizen
W28/1 August 24, 2022 Steve DePue Citizen
W29/1 August 24, 2022 Andrew Keller Citizen
W30/1 August 24, 2022 William Llamas Citizen
W31/1 August 24, 2022 Bruce McLean Citizen
W32/1 August 24, 2022 Jeri Valdez Citizen
W33/1 August 25, 2022 Kevin Cook Citizen
W34/1 August 25, 2022 Kim Hunter Citizen
W35/1 August 25, 2022 Monica Zukrow Citizen
W36/2 August 26, 2022 David Copp Citizen
L6/9 August 26, 2022 Ward Habriel Citizen
W37/1 August 26, 2022 Maurine Hansen Citizen
W38/1 August 28, 2022 Roger Cole Citizen
L7/3 August 29, 2022 Kim Hunter, Project
Manager, Land
Development Division
Butte County
Department of
Public Works
L8/4 August 29, 2022 Leigh Ann Sutton,
PE; Director Public
Works Engineering
City of Chico Public
Works Department
L9/11 August 29, 2022 Laurie and Jim Noble Citizens
L10/25 August 29, 2022 Dana Ripley Citizen
L11/12 August 30, 2022 Richard L. Harriman Law Offices of Richard L.

Harriman
W39/1 August 30, 2022 Dannette Barefield Citizen
W40/1 August 30, 2022 Patty Wilson Citizen
1627
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Alice Patterson July 17, 2022 W1 1
I am inquiring for my partner, who lost his home in the fire… How do I find out if his property would be affected by an Easement should this sewer project be approved? This could impact how/when he rebuilds. Property address is 5975 N.

Libby. Is there a list of locations where the easements would be going?
Thank you for your message. You can go to https://paradisesewer.com/ and scroll down to “Find My Property”. If you input your friend’s address, it will show you whether it is within the proposed sewer area.

Linda Barton July 25, 2022 W2 1
I am about to choose a builder to finally rebuild in Paradise.

At this moment, it appears the sewer project for Paradise will help those businesses on Skyway. Which means 99%+ of the residents won't benefit from this undertaking. Who is going to pay for this very expensive but necessary project? I am not interested in seeing it listed when I get my property tax bill.

The Town has secured grant funding for the development of the preliminary engineering and preparation of the environmental documentation. We are also working to secure grant funding for the design, right-of-way, and construction stages of the project. The connection fees have not yet been determined for property owners connecting to the system.

State Water Resources Control
Board July 27, 2022 L1 1 See attached letter. All information advisory in nature.

Thank you for the information that you provided on federal regulatory requirements that must be met as part of the Town’s proposed Clean Water State Revolving Fund (CWSRF) funding application process. We understand that the list of necessary actions referenced in your comment letter pertain to the Town’s pursuit of CWSRF funding, along with the corresponding CEQA+ process. We understand that this is not a list of actions and materials that are being recommended for inclusion in the Draft PEIR; therefore, no change has been made to the PEIR.

Kat Carlisle July 28, 2022 W3 1
Can you tell me when the final design and right of way
acquisition phases will begin for the Paradise Sewer Project please?
I saw on the project schedule that these phases are
anticipated to begin in Summer 2022, but I wasn't sure if that meant they have already started or not. Thank you! Thank you for your comment and question. We have not yet started design or right of way, as we are still seeking funding for this phase of the design. We will update paradisesewer.com as soon as an updated timeline is established. This website will continue to be updated as the project phases are identified. www.Paradisesewer.com
Earl Eckert Aug 1, 2022 W4 1
Will the agreement with Chico permit all pumped septic
loads to be disposed of in paradise rather than continuing to be disposed of at the County land fill lagoon. Own property at 2199 De Mille Rd.

The publlic Sewer Regionalization Project Advisory Committee (SRPAC) drafted the Principals of Agreement, which were the outline of the draft Intermunicipal Agreement (IMA) between the Town of Paradise and the City of Chico. Currently, only residential and commercial sewer connections are identified and accounted for in the Sewer Service Area (SSA) and sewer discharge that will be discharged at the City of Chico Water Pollution Control Plant. Pumped septic systems discharges from residents or businesses are not accommodated in the discharge to the Chico WPCP. Disposal of pumped septic loads will not change as it is outside of the scope of this Project.

Pam Galloway Aug 2, 2022 W5 1
I think it is a stupid waste of money that could be used for a different project. The cost of the project, the amount of time necessary to complete the sewer project and the number of people who would benefit from it should make it a non
starter.

Thank you for your input. The Town appreciates all viewpoints and opinions expressed by our community.

Brian Anderson Aug 3, 2022 W6 1 Who will handle the collection system and pump stations daily operations?
Thank you for your question. The Town of Paradise staff is in charge of maintainance and operation of the collection system and pump stations.

Paradise Sewer Project PEIR Comment Matrix
1628
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Brian Anderson 2 What type(s) of odor control systems will be used? The Proposed Project includes the use of odor control canisters, as stated in Section 2.8 of the Draft PEIR.

Section 3.3.4.4 explains "Routine operations and maintenance activities will include periodic inspection of the odor control cannisters, which will be provided at the Export Pipeline System’s flow control and metering structure." Section 2.8 further elaborates: "Physical on-site inspection and maintenance of the air release valves and odor control canisters would be done according to the maintenance protocols that accompany the devices, and would occur every 6 months to ensure optimal performance of these devices. Air release valves would be inspected to ensure they are operating properly. The odor control canisters would be replaced as needed when the carbon media becomes saturated and loses the ability to absorb odors." Brian Anderson 3 And projected annual cost? The current level of design has not yet supported this level of detailed planning; annual costs have not yet been projected.

Brian Anderson 4 Where will biosolids and sewage debris be removed to? Town of Paradise flows will join with City of Chico flows at the Chico Water Pollution Control Plant (WPCP), from which point they are treated per the Chico WPCP's current processing standards. Section 2.4.2 in the Draft PEIR outlines this process: "The sludge (biosolids) portion of the wastewater is treated by anaerobic digestion, followed by mechanical dewatering. The resulting biosolids are then hauled directly from the Chico WPCP for land application in unincorporated Sacramento County, California." Brian Anderson 5
How many full time employees will be hired to operate and maintain Paradise Wastewater Collection and
Transportation?
As stated in Section 3.3.4.1 of the Draft PEIR : "About 5-10 permanent employees would be required to serve the Proposed Project during operations and maintenance." Section 2.8 provides a further breakdown of that number: "The wastewater operations team would include…: administrative and reception staff, accounting staff, three field crew/utility staff, and one on-site service technician." Brian Anderson 6 Under what jurisdiction/license will Paradise Wastewater be in compliance with State Water Resources Control Board? The treatment and discharge of the flow from the Town of Paradise will be handled under the City of Chico's current permits, as outlined in Section 2.4.2 of the Draft PEIR: "The Proposed Project… would not increase nor substantially decrease the availability of sewer service within the City or County (see more details in Section 2.5.1 Core Collection System and assessment of effects in Section 3.18.4, Impact Analysis [Utilities and Service Systems]). Therefore, the Town’s connection falls within the requirements of this NPDES permit." Currently, the City's treated wastewater "is regulated in accordance with National Pollutant Discharge Elimination System (NPDES) Permit No. CA0079081", as also stated in Section 2.4.2.

Brian Anderson 7 What city department will oversee Paradise wastewater operations?
The Town's Public Works department would oversee the operations of the Proposed Project. See Section 2.8 of the Draft PEIR: "The existing Public Works director would serve in a management role over sewer functions."
Ivan Garcia Aug 5, 2022 W7 1
Good luck on the project. Would like to encourage and
support the paving of a multi-use path on top of your sewer line with the ability to connect this new path to the
intersection of Honey run/Skyway near Skyway golf park on the west and to the Paradise Memorial Trail in Paradise. I would suggest paving so that you can send emergency
equipment up the hill to fully utilize the Skyway for
emergency evacuations.

Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the Town's jurisdiction. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.
1629
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Joe Rees Aug 5, 2022 W8 1
As natural disasters increase in frequency and severity, climate change is becoming harder and harder to ignore. The rise in these disasters along with an overall growing sense of crisis when it comes to the environment is causing an
increase in climate anxiety.

In fact, a recent Yale survey found that 70 percent of
Americans are now “very or somewhat worried about global warming.”
I thought this would be an interesting topic to cover in a guest article for your website. I would address the increase in climate anxiety and what your site visitors can do to relieve their stress while also helping the environment.

What do you think?
Thank you for your email. I appreciate your offer. Right now we are focused on the Paradise Sewer EIR, but if we see a fit in the future, we will let you know.

Rick Hoddinott Aug 8, 2022 W9 1
Along the proposed alignment for the export pipeline on Entler Avenue, what is the pipe constructed of and where will it be located along the roadway?
Thank you for your questions. Section 2.5.2 of the Draft PEIR explains that the Export Pipeline System would be located within the Butte County right-of-way on Entler Avenue. As stated in Section 2.5.2.3, "the following materials are anticipated to be used on the Export Pipeline System construction:
• PVC pipe and miscellaneous fittings
• Concrete maintenance holes
• Precast concrete cylinders for the Transition Chamber, the Flow Control and Metering Structure, and associated mechanical and electrical equipment for installation at each of the two structures • Metal carrier pipe at each of the five trenchless crossings • Temporary and permanent paving (asphalt)
• Backfill material"
Rick Hoddinott 2 How will the project address nearby wells which may be located near the proposed alignment?
As stated in Section 3.10.1.4: "Historical use of high-density septic systems and leach fields in Paradise have resulted in surface and groundwater contamination". Because it has been shown that septic systems can lead to "effluent in water supply resulting in degradation of water quality" (Section 3.19.1.4), implementing a sewer system would lessen the risk of contaminating nearby well water quality. All pipelines will be subject to inspection and maintenance as outlined in Section 2.8 of the Draft PEIR. Specifically, per Section 2.8 "The Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (Sanitary Sewer Systems General Order, or SSSGO) was adopted by the SWRCB in May 2006. The purpose of the SSSGO was to provide a consistent statewide approach for reducing sanitary sewer overflows (including leakages). Per the SSSGO, and subject to its terms, the Town will need to develop a sewer system management plan. The sewer system management plan will include policies, procedures and activities covering the planning, management, operation and maintenance of the collection system. As part of this sewer system management plan, the Town must also develop and implement an overflow emergency response plan to identify measures to protect public health and the environment." Additionally, the Proposed Project would not impact the availability of water in nearby wells. Section 3.10.4.2 of the Draft PEIR states that construction of the Proposed Project "would not cause a new deficit in aquifer volume or a lowering of the groundwater table" and that "no impact would occur on groundwater supply and recharge during operations and maintenance." Also see responses to Ripley's comment #L10-7.
1630
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Rick Hoddinott 3 Was the old railroad (Old Sacramento Northern) right of way considered for the pipe alignment in lieu of Entler Avenue? The specific route you propose would not reduce any environmental impacts of the chosen Entler Avenue Alternative, and therefore, was not analyzed in the Draft PEIR. As stated in Section 5.1.1 of the Draft PEIR, "CEQA Guidelines Section 15126.6(a) states that 'an EIR shall describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project, and evaluate the comparative merits of the alternatives. An EIR need not consider every conceivable alternative to a project.'" Rick Hoddinott 4
During construction, how will the project address temporary traffic control along Entler Avenue, considering CHP uses the roadway as direct access.

The Proposed Project includes implementation of mitigation measure MM-HAZ-6: Traffic Management Plan to reduce potential traffic impacts during construction. The traffic management plan will be enforced by the Town and/or contracted construction manager hired by the Town for the project and will include requirements such as: Schedule truck trips outside of the peak traffic hours, Store all equipment and materials in designated staging areas, Install traffic control devices where traffic conditions warrant, Coordinate all construction activities with the emergency service providers in the area, and Post notices and/or appropriate signage to notify the public of upcoming construction activities. Refer to Section 3.9.4.6 of the Draft PEIR for a detailed description of MM-HAZ-6: Traffic Management Plan.

As discussed in 3.9.4.6, "per the SSSGO, and subject to its terms, the Town will need to develop a sewer system management plan. The sewer system management plan will include policies, procedures and activities covering the planning, management, operation and maintenance of the collection system. As part of this sewer system management plan, the Town must also develop and implement an overflow emergency response plan to identify measures to protect public health and the environment".

Please also see response to Comment L7-1 from the Butte County Public Works Department.

Vicki Taylor Aug 8, 2022 L2 1
I am so happy to see this project going forward. As a 36 year resident of Paradise I am well aware of all the projects that have fallen thru due to lack of sewers or septic capacity. I look forward to seeing new businesses in Paradise that were made possible because of the sewer project. The entire town population will certainly benefit, even if they are not directly connected.

Thank you for your input. The Town is considering all comments in preparation of the Final PEIR.

Anonymous Aug 8, 2022 L3 1 Sounds good. Build it. Thank you for your input. The Town is considering all comments in preparation of the Final PEIR.

Tod Kimmelshue Aug 8, 2022 L4 1
Could the pipeline go west on the unimproved portion of Edgar Ave instead of Chico Ave. Then north to Taffee. This would save us from having to destroy a paved road (Chico Ave). I understand those are public right of ways.

Thank you for your question. City ownership of the unimproved portion of Edgar Avenue could not be confirmed. Additionally, the specific route you propose would not reduce any environmental impacts of the chosen Entler Avenue Alternative, and therefore, was not analyzed in the Draft PEIR. As stated in Section

5.1.1 of the Draft PEIR, "CEQA Guidelines Section 15126.6(a) states that 'an EIR shall describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project, and evaluate the comparative merits of the alternatives. An EIR need not consider every conceivable alternative to a project.'" We will keep your suggestion in mind as the project enters the next phase of design.
1631
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Ronald Lassonde Aug 10, 2022 W10 1
I am very impressed with the due diligence that the Paradise Town Staff has put into the Sewer EIR. The Sewer is
absolutely necessary for businesses to rebuild in our Down Town. A rebuilt Down Town is critical to the overall recovery of our town.

We need the PEIR approved as soon as possible so we can move forward and rebuild our Town.

Thank you for your input. The Town is considering all comments in preparation of the Final PEIR.

Mandi McKay Aug 10, 2022 W11 1
Chico Velo supports the Town of Paradise and the Sewer
Project and encourages the project or project sponsor to include the paving of a multi-use path for bicycles and pedestrians on top of the proposed project.

Currently, Skyway is not a safe route for bicyclists or pedestrians traveling to or from Paradise. This project provides a unique opportunity to solve dual challenges of meeting the need for wastewater infrastructure and also providing a safer, more direct route between Chico and
Paradise for bicyclists and pedestrians. If the new multi-use path followed the sewer line all the way to Southgate Lane on the East side of Hwy 99, it would connect users to the existing Midway bike path on the West side of 99.

Additionally, a multi-use path could enable emergency
equipment to drive up the path and allow Skyway to be fully utilized as an emergency evacuation route.

Thank you for the consideration- please let us know if you have questions or if Chico Velo can provide additional
support.

Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Richard Smith Aug 10, 2022 L5 1
I own a 20 acre walnut orchard at 3662 Hegan Ln. Chico
cross from Fimple/Hegan intersection. PG&E installed a new gas line on the north side of Hegan (2-3 ft.) north of edge of pavement. Where is the sewer line going to be placed in my area, under Hegan Lane? north side of Hegan Lane or south side of Hgean Lane? If on the same area as PG&E gas line, what is the minimum distance from gas line? What is the diameter of sewer line? My concern is if this trenching will kill the walnut trees/root system? or if trees will have to be removed for the trenching?
Thank you for your questions. We appreciate your concerns. The Proposed Project would not remove any trees during trenching. As stated in Section 2.5.2.1 of the Draft PEIR, the ridge gravity section (from connection with Core Collection Service to transition chamber located just before pipeline reaches Chico) will consist of two separate gravity sewer pipes: one 8 inches in diameter to handle low flows, and one 10 inches in diameter that would accommodate the build out flows. The pipeline would be placed under Hegan Lane, within the public right-of-way. The Town will be following all requirements of the PG&E Greenbook (https://www.pge.com/en_US/large-business/services/building-and-renovation/greenbook-manualonline/greenbook-manual-online.page) 1632
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Andrew D'Lugos Aug 11, 2022 W12 1
Currently, Skyway is not a safe route for bicyclists or pedestrians traveling to or from Paradise. This project provides a unique opportunity to solve dual challenges of meeting the need for wastewater infrastructure and also providing a safer, more direct route between Chico and
Paradise for bicyclists and pedestrians.

I fully support the plan of paving a multi-use path for bicyclists and pedestrians.

Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Kirk Monfort Aug 11, 2022 W13 1
This would be a great opportunity to build a bike path to Paradise that would tie into the current Paradise Bike Path that goes from the Paradise Park up through Magalia. We never had a link from Chico to that Bike path although the right of way has been preserved from the Midway by Hagen Lane. It would also provide for service and inspection of the eventual sewer line. A Dual Use facility. There might also be transportation dollars available to do this.

Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Richard Stone Aug 15, 2022 W14 1
JUST PAVED ALL OF SKYWAY, IT'S REALLY A NICE ROAD. I

HOPE THAT THE NEW ROAD WILL NOT BE DUG UP FOR THE

SEWER PIPE AND JUST PATCHED UP TO LOOK LIKE CRAP AS

THE UNDERGROUND PGE SUB COMPANYS HAVE DONE IN
TOWN. SHOULD HAVE WAITED ON THE PAVING UNTILL THE
SEWER WAS PUT IN. THEN PAVE THE SKYWAY.

Thank you for your comment. Consistent with Town policy, paved areas that are impacted by the sewer project will be repaved in full lane widths, to avoid trench patchwork.

Joseph Mount Aug 16, 2022 W15 1
I was informed that the treatment plant had treated water they wanted move .

Would you please send me any test result on the treated water
Thanks for your inquiry. I understand your question is about the discharge/effluent from the Chico Water Pollution control plant. Although the Town of Paradise proposed to connect to the WPCP in the future, we do not yet have a connection (which is being analyzed in the current Draft PEIR). I would suggest you contact the City of Chico Water Pollution Control Plant directly to inquire about the effluent.

Brian Anderson Aug 22, 2022 W16 1 What agency will have jurisdiction to provide collection services within the Town of Paradise?
Thank you for your comments on the Paradise Sewer Project. The Town of Paradise will own and operate the sewer system. We are currently scheduled to start Design and Right of Way in the near future, as funding becomes available, and the details of implementing the system will be identified at that time. Some specific details, such as the operator name license information, are not yet identified. Information on the current permit structure for the Town can be found in Section 3.10.1.6 of the Draft PEIR: "As required by Phase II of the NPDES, Butte County operates under a Small Municipal Separate Storm Sewer System (MS4) stormwater permit, which authorizes the discharge of stormwater to surface water in the state from small municipal separate storm sewer systems. The Town’s MS4 Permit is currently operating under an approved waiver secured in 2021 due to the reduced population associated with the 2018 Camp Fire and other factors. See Section 2.4.2 for information on the Chico WPCP and associated NPDES permit." Brian Anderson 2 Who holds the license to operate wastewater services within Paradise jurisdiction? See above response to Comment #W16-1.

Brian Anderson 3 Who will maintain and operate the pump stations ? The Town of Paradise is in charge of maintenance and operation of the collection system and pump stations. 1633
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Brian Anderson 4
What methods of odor control will be employed at each
pump station, wet well and other areas where wastewater may come in contact with atmosphere? Odor mitigation is of critical importance to our community.

The Proposed Project includes the use of odor control canisters, as stated in Section 2.8 of the Draft PEIR.

Section 3.3.4.4 explains "Routine operations and maintenance activities will include periodic inspection of the odor control cannisters, which will be provided at the Export Pipeline System’s flow control and metering structure." Section 2.8 further elaborates: "Physical on-site inspection and maintenance of the air release valves and odor control canisters would be done according to the maintenance protocols that accompany the devices, and would occur every 6 months to ensure optimal performance of these devices. Air release valves would be inspected to ensure they are operating properly. The odor control canisters would be replaced as needed when the carbon media becomes saturated and loses the ability to absorb odors." Additionally, see Section 3.3.4.4: "Once complete, the Proposed Project would provide an overall odor benefit, because it will replace existing septic tanks within the sewer service area that emit unpleasant odors." Brian Anderson 5 24 hour response to spills and overflows is critical.

As stated in Section 2.8 of the Draft PEIR, the Town will "develop and implement an overflow emergency response plan… Pursuant to [the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems], the Town will be required to report sanitary system overflows... using an electronic reporting system. Review and approval by the City and County of the Town’s proposed sewer system management plan would be required prior to start of operations." See Section 2.8 of the Draft PEIR for a list of minimum requirements of the Town's sewer overflow response plan.

Brian Anderson 6
An 18 mile pipeline with about a 1500 ft elevation loss, gravity flow management is critical and demands highly
skilled personnel.

The proposed Export Pipeline System includes segments of both gravity flow and pressurized flow. See Section ES1.5.2 of the Draft PEIR to see the sub-components of the Export Pipeline System. The wastewater operations team will include 5-10 permanent employees, including three field crew/utility staff and one onsite service technician, as outlined in Section 2.8.

Steven Cismowski Aug 22, 2022 W17 1
I am writing in opposition to the proposed Paradise Sewer Project. Given the increase of ground water concerns in the north state, coupled with the impacts the current and
projected drought cycle is having on our groundwater
resources, this project is perilously flawed.

Thank you for your input. The Town is considering all comments in the preparation of the Final PEIR. We appreciate all viewpoints and opinions expressed by our community. We discuss groundwater impacts in Section 3.10.4 of the Draft PEIR. (p.268 Butte Co Policy W-P1.8: The County supports conversion from septic systems to public sewer service, where feasible). See also responses to Ripley's comment letter #10. 1634
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
2 Information is needed regarding the projected increase in size of the current Chico Wastewater Treatment Plant in order to accommodate this increase in treatment. Keeping in mind Chico's current growth-rate and several other LARGE development projects that will also increase demand on this facility - Valley's Edge and Barber Yard, this facility will need to expand, but to what extent?
As stated in Section 3.18.4.1 of the Draft PEIR: "The Regionalization Planning Report for the Paradise Sewer Project determined that the Chico WPCP has adequate capacity to serve the Proposed Project’s projected demand and commitments, in addition to serving the City’s service area within its jurisdictional boundaries (Carollo Engineers 2022)… Based on these factors, the Proposed Project would not stress the capacity of the current system. The Proposed Project would not require the construction or relocation of wastewater facilities, nor would it require expansion of the existing Chico WPCP facility." This section goes on to outline in further detail: "The Chico WPCP… has an existing capacity of 12 mgd with future expandability of up to 15 mgd. The annual average flow coming into the Chico WPCP currently is 6.3 mgd. The Proposed Project would add an additional 0.109 mgd of wastewater to the Chico WPCP influent at the time of initial connection (estimated for 2026) and a maximum of 0.464 mgd at full build-out (estimated for 2057) and would not increase or decrease the availability of sewer service within the City or County. " Further, as discussed in Section 2.4, "due to estimated future wastewater flow increases to the Chico WPCP based on the City’s current and future population, including the estimated Town sewer discharge in 2026, the City would need to implement a project at the WPCP, consisting of the addition of a fourth secondary clarifier. This clarifier would be installed within the footprint of the existing plant, adjacent to three existing secondary clarifiers.

The fourth clarifier is required whether Paradise connects to the Chico WPCP or not. Considering the Town’s maximum of 0.464 mgd flow anticipated to connect to the City’s WPCP in 2026, the fourth clarifier would be needed in 2028. Without the Town’s additional flow, the fourth clarifier is needed in 2029. Finally, Chico City Code Section 15.40.285, Regulation of Waste Received from Other Jurisdictions , requires that any project with another municipality which would utilize the Chico sanitary sewer system requires an intermunicipal agreement (IMA) and sets out the requirements for such agreement. 3 Information and analysis are needed to fully understand the impacts of removing the equivalent of 1/8th of Big Chico Creek's average annual flow out of the current hydrological cycle based on projected peak flow at sewer build out. The long-term impacts of effectively pumping that much water out of the hydrological cycle helping feed local aquifers and creeks (chiefly, Butte Creek, the last viable salmon run off the Delta river system) is unconscionable. Paradise, preCamp Fire, was renowned for its forest, largely of Ponderosa pine, growing at lower altitudes than commonly
encountered. The additional ground water these trees
received from leach lines, not to mention additional
nutrients, helped support this rich forest. Taking that life support away will certainly forever change the forest of Paradise's future canopy. Property owners wishing to
replicate that forest will need to pump even more ground water to use in their landscapes further exacerbating the drying of downstream aquifers.

The Proposed Project does not include any pumping of groundwater. We understand you are referring to the removal of leach fields and the presumed loss of water to the local system. The Paradise Irrigation District (PID) supplies water to the Town of Paradise, as demonstrated in Section 3.5.1 of the Draft PEIR. From 2022 PID UWMP: "PID overlies an area with fractured rock aquifers as the only potential groundwater supply.

These types of aquifers are not expected to provide a significant source of water". At the time of plan preparation, PID is not within a designated basin and not subject to compliance with the Sustainable Groundwater Management Act (SGMA). Big Chico Creek average annual flow is 300 cfs (https://sacriver.org/explore-watersheds/eastside-subregion/big-chico-creekwatershed/#:~:text=Records%20show%20that%20the%20average,during%20winter%20storm%20runoff%20 events.), or 139.9 mgd (https://www.convertunits.com/from/cfs/to/million+gallon/day+[US]). At the Project's proposed full buildout, which may not occur until 2057, the projected flow would be 0.464 mgd, which is 0.3% of the Big Chico Creek average annual flow, not 1/8th. 1635
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
4 The proposed path crosses three surface flow creeks (Butte, Comanche and Little Chico) that countless wildlife (and residents) relies on for sustenance and recreation. While the current engineered solution for these crossings may provide sufficient cover, over time, erosion will continue to drop current creek elevations eventually exposing these lines making them vulnerable to damage and leakage.

The proposed pipeline path does not cross surface creeks; it goes underneath them at a minimum depth of 20 feet below the creek bed surface (as stated in Section 2.5.2.2 of the Draft PEIR, and shown in Figure 2-14).

Further, it was determined that "Operation and maintenance activities… would not include ground disturbing activities that could expose or disturb soil. Therefore, operation and maintenance of the Proposed Project would not result in substantial soil erosion or the loss of topsoil" (Section 3.7.4.2). The Town's sewer system management plan, outlined in Section 2.8, will contain a sewer overflow response plan to respond to damage or leakage of the pipeline system, including the following minimum requirements: "Proper notification procedures so that the primary responders and the regulatory agencies are informed of all overflows in a timely manner;... Procedures to ensure that appropriate staff and contractor personnel are aware of and follow the Town's sewer overflow response plan and are appropriately trained to do so;... A program to ensure that all reasonable steps are taken to contain untreated wastewater and prevent discharge of untreated wastewater to waters of the US and minimize or correct any adverse impact on the environment; The Town Public Works Department would have on-hand the equipment and spare parts necessary to rapidly implement a repair."
5 The system will require frequent clean out and regular servicing in order to remain functional. To fail to do so could result in calamitous disaster and contamination of numerous entities (rivers, creeks, farmland, etc.). Encumbering future municipal operations with this laborious task over such a long pipeline will certainly result in failure and/or increased costs to the consumer. There is simply no way to guarantee that funding for this team of pipeline workers and
equipment will be sustainable.

Section 2.8 of the Draft PEIR includes inspection, monitoring, and maintenance procedures that will be included in the Town's sewer system management plan, which is required to comply with the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. Procedures that relate to clean out and regular servicing include, but are not limited to, the following: "Inspections of the Core Collection System and the Export Pipeline System would occur one to two times per year, depending on deposition observed within the system… As needed, based upon the results of the camera inspections, the pipelines would be flushed to push deposited material farther down the pipelines to the Chico WPCP… Physical inspection and maintenance of instrumentation would occur monthly according to the maintenance protocols that accompany the instruments." Funding for operations is outside the scope of this PEIR. As commenter provides an opinion on future funding availability with no reference, the Town can not respond to the final sentence.
6 Paradise's septic waste system served to provide a governor to check unbridled growth. Removing that check, will
certainly further increase Paradise's growth potential
resulting in an escalating list of long-term impacts for future Butte County residents. The increase growth potential will make future fire suppression impossible, trigger roadway expansion, increase sprawl and further tax our limited
natural resources, most acutely, our water resources.

We appreciate all viewpoints and opinions expressed by our community; however, since this comment consists of strictly opinion on future growth potential with no supporting evidence, the Town has no response to the commenter's thoughts. However, growth inducing impacts in the Town have been analyzed and are outlined in Section 4.4, and it is concluded that "Any inducement of the population growth that might occur as a result of the Proposed Project in the shorter term would be a return and/or regrowth and repopulation toward pre-fire levels. Any growth beyond pre-fire levels that could occur in the longer term would be consistent with the Town of Paradise 2022-2030 Housing Element Update (Town of Paradise 2022a). This growth would be limited by (1) the current boundaries of the Town, (2) the capacity of the Proposed Project infrastructure, and (3) the Chico WPCP operational (disposal permit allowance) and existing plant infrastructure (facilities limitations) capacity." Further, as noted in multiple locations in the Draft PEIR, this CEQA effort is limited to within the Paradise town boundaries and does not allow for sewer connections outside of the Town.
7 This country has a rich history of failed environmental engineered solutions to current challenges. Measures like this start out seemingly a "good idea at the time" only to create unforeseen impacts for future generations to solve.

We appreciate all viewpoints and opinions expressed by our community. 1636
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
8 I encourage you to reconsider grandfathering in previous property-owner's septic systems to allow our neighbors who have suffered so much to return to their homes and preserve the future of Paradise by ensuring large developers a
toehold to urbanize our beloved mountain communities.

The scope of the Proposed Project is intended to cover the Core Collection System, and at a programmatic level, cover the potential for future connections at the request of property owners outside of the Core Collection, yet within the Town limits, which is considered in the Extended Collection System assessment.

This includes an opportunity for other Town property owners to apply to connect to the sewer system in the future, following buildout of the export system. Further, Section 1.1.2 of the Draft PEIR states: "The overall purpose of the Proposed Project is not to serve the entire Town; areas will continue to exist that are served by the existing Onsite Wastewater Management Zone. Instead, the Extended Collection System would provide an opportunity for other property owners within Town limits to connect." Ryan Duncanwood Aug 22, 2022 W18 1 ITS GOOD Thank you for your input. We appreciate all viewpoints and opinions expressed by our community.

Bud Linggi Aug 22, 2022 W19 1
I lived behind the Optimo Lodge from o/a 1948 until I went into the Service, 1960. Of course, along the way of those years, my dad went to Chico, down Neal Road, for the
Crocker Bank and I might have accompanied him and used a restroom after he made the deposit.

By this time, local dogs wiped out our chickens and after the Crocker Bank, we went to a Chico outfit that gave us the number of cleaned chickens we needed.

The following week our destination was some place in
Oroville for the steaks we needed for the next week, a long trip down Clark Road was used.

So when talk of sewers for Paradise comes up, I remember the leech fields where I got my fishing worms...

Thank you for your input. We appreciate all viewpoints and opinions expressed by our community.

Diane Pajouh Aug 22, 2022 W20 1
I would like to request that we do not damage our new
Skyway Roads that have just been installed/updated. Thank You.

Repaving of roadways would occur consistent with Town policy, such that Town paved areas that are impacted by the Proposed Project will be repaved in full lane widths, to avoid trench patchwork. For those roadways not within the Town, Butte County or the City of Chico would have jurisdiction over any repaving requirements for those sections of road.

Mike Petersen Aug 22, 2022 W21 1
Has the town looked into putting turbines inside the 18 mile pipeline to generate electricity? I believe this has been done in other cities and might give Paradise a chance to control our own energy independence.

Thank you for your input. This is not currently part of the proposed project, as directed by Town Council.

Michael Schwartz Aug 22, 2022 W22 1 Not the best idea they have. For too many reasons. I vote no. Thank you for your input. We appreciate all viewpoints and opinions expressed by our community.

Gary Wolt Aug 22, 2022 W23 1 What policy is in place to control cost increases in the future?
Thank you for your comments and questions. The City of Chico will be the wastewater operator for the Chico Water Pollution Control Plant, and the treatment portion of the fees will be administred by the City. The Intermunicipal Agreement (IMA) between the Town of Paradise and the City of Chico addresses noticing for costs, which are compliant with all public noticing requirements for future rate increases. The Principles of Agreement, which will inform the IMA are available on the project website at paradisesewerproject.com. 2 Will the town of Paradise be subsidizing Chico's wastewater system, with no control on whatever increase they want or need. The ability to justify any price increase seems to be a normal phenomena.

The Town of Paradise and the City of Chico performed an assessment of the value of the existing City of Chico Water Pollution Control Plant, which are included in the Technical Memorandum and reports located on Paradisesewer.com. The connection fee identified pays for the value of the plant at the time of connection, and accommodates the Sewer Service. See response to Comment #W23-1 for more information. 1637
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
3 Are they incorporating any valving in the design for
emergency use in the event that the pipeline or Chico's waste water facility experiences a catastrophic failure? Yes, appropriate valving is being provided. As part of the discussion under Flow Control and Metering Structure in Section 2.5.2, in description of transition chamber, it is stated: "The first below-ground chamber would be dry (the wastewater would remain within the pipe that is exposed within the chamber) and would contain a magnetic flow meter and a pressure gauge on the pipeline, with the chamber being the access point to this flow meter. The second chamber would be wet, with the wastewater discharging into the chamber via a modulating plug valve. A modulating plug valve would keep the Transition Chamber and Gravity Force Main Sections full, to maintain the hydraulic function of the Gravity Force Main Section. 4 Would valving be in place to allow Paradise to construct there own wastewater facility, or have a load out facility at a future point in time?
No, there is no valving being provided for a future Paradise wastewater facility, nor is any accommodation being provided for a load out facility, as these fall outside the scope of the proposed Project..

Matthew Carlson Aug 23, 2022 W24 1
I support the sewer project and along with it believe a multi use path would be an invaluable asset to the community. It would encourage community health and growth. Paradise
lacks safe routes currently so this is needed.

Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Tony Catalano Aug 23, 2022 W25 1 Please include a bike lane! Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Rob Williams Aug 23, 2022 W26 1
Caltrans funded a bike riding tourism study and our Final Report identified several Signature Bikeway Routes i.e. East Bay Mud Pipeline. The report has an economic analysis of adding bike/walking paths to a local economy. See,
BikeValleytoSierra.com
Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Kevin Baxter Aug 24, 2022 W27 1
I would like to mention my support for the addition of a multi use path along the Skyway during construction of the sewer line. This path would be of historic interest as it would continue the "line" used by trains in the past as well as provide a safer route for non motorized travel to and from Paradise via the Skyway. The path would also be a
viable option as an alternative route for emergency vehicles or as an additional route of evacuation, should the need arise. Thank you in advance.

Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Steve DePue Aug 24, 2022 W28 1
It would be an ideal time to put in a wide paved bike trail up to Paradise on the skyway corridor. You could also put in fiber optical cable for internet use along the same right of way with the sewer project. Take advantage of multiple uses for the construction project on the sewer system. Also, the paved bike path provides superior access to the fiber optical cable and sewer lines when repairs or access is needed.

Perhaps power could also be delivered from the Chico area to Paradise in an underground line rather than on poles! Planning makes for a better future!
Thank you for your comment.The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.
1638
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Andrew Keller Aug 24, 2022 W29 1
I support the project and encourage the project to include a multi use paved path for bikes and pedestrians on top of the sewer project. Such a path could be used by emergency
equipment to drive up the hill even while Skyway itself is functioning as a one-way downhill evacuation route. This is a great opportunity to also include new regional multi-use nonmotorized path to connect Chico and Paradise from the intersection at Honey Run and Skyway to the Paradise
Memorial Path
Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

William Llamas Aug 24, 2022 W30 1
Seems the Draft PEIR a done deal? So confusing. We need a more comprehensive review other than a commission
and/or Board. A citywide meet up for face to face speaking is necessary. And are there any ideas on building UP in
downtown. Apartment buildings may be most suitable for
many residents. What about beautification projects with help of citizens? So many ideas and no leadership. Time is a wasting and we should have already planted thousands of trees.

Thank you for your input. The PEIR provides the environmental review for the proposed Paradise Sewer Project. Density (multi-family housing or vertical construction) becomes more feasible with a sewer system, and is one of the benefits of the sewer project. Section 1.3.1 of the Draft PEIR describes the public notices, scoping meetings, and public review meetings that have taken place so far: "Due to restrictions under State of California Executive Order N-33-20, scoping for the Proposed Project occurred under Coronavirus Disease 2019 (COVID-19) restrictions; therefore, electronic postings, virtual meetings and physical mailings were the appropriate venues for information distribution… The Town hosted two virtual public scoping meetings to seek public and stakeholder input on the environmental scope of the Proposed Project. The first virtual public meeting took place on May 13, 2021, and included 29 public attendees. The second virtual public meeting took place on May 25, 2021, and included 14 public attendees. Public meeting attendees were encouraged to ask questions and provide input on the Proposed Project and process." Beautification projects and other potential Town projects are not included in the scope of this sewer system assessment, but all comments are being reviewed by the Town for future opportunities.

Bruce McLean Aug 24, 2022 W31 1
I live along the Little Chico Creek bike path and have cycled to Paradise up the Skyway at least once a month over the last 7 yrs.

It was very disappointing not to see a dedicated two-way bike path installed when PG&E put their electrical
infrastructure underground. Then it was extremely
disappointing when a dedicated bike path was not installed when the Skyway was recently paved.

Let's not strike out by not creating a dedicated bike path when the sever line is extended from Paradise to Chico.

Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Jeri Valdez Aug 24, 2022 W32 1
I decline the project in it's entirety! If it does not service ALL main roads as well as the WHOLE community. What is the
point? Makes no sense at all.

Thank you for your input. We appreciate all viewpoints and opinions expressed by our community and the Town is considering all comments in preparation of the Final PEIR. The Proposed Project includes the opportunity for property owners outside of the initial Core Collection System to connect to the sewer system.

See Section 2.5.3 of the Draft PEIR: "The Extended Collection System would be an extension of the Core Collection System that would allow collection of sewage from parcels outside the Core Collection System, within the Town limits."
1639
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Kevin Cook Aug 25, 2022 W33 1
I support the project and encourage the project to include a multi use paved path for bikes and pedestrians on top of the sewer project. This path could be used by emergency
equipment to drive up the hill even while Skyway itself is functioning as a one-way downhill evacuation route. This is a great opportunity to also include new regional multi-use nonmotorized path to connect Chico and Paradise from the intersection at Honey Run and Skyway to the Paradise
Memorial Path. I am an avid local cycler and this would only encourage more cyclists to come visit and recreate in our community.

Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

Kim Hunter Aug 25, 2022 W34 1
I am preparing comments on behalf of the Butte County
Public Works Department. Is there an email address that can be used to send comments on Monday?
Thank you,
Kim Hunter, Project Manager
Land Development Division
Butte County Public Works Department
Kim, I received your email about how to submit comments for Monday. You can send them to this group via email [email addresses included: Stanley, Ashley <[email protected]> , Curtis, Colette <[email protected]>, Mattox, Marc <[email protected]>] or submit a hard copy in the mail. Thank you, Ashley
Monica Zukrow Aug 25, 2022 W35 1
I support the project and encourage the project to include a multi use paved path for bikes and pedestrians on top of the sewer project. Such a path could be used by emergency
equipment to drive up the hill even while Skyway itself is functioning as a one-way downhill evacuation route. This is a great opportunity to also include new regional multi-use nonmotorized path to connect Chico and Paradise from the intersection at Honey Run and Skyway to the Paradise
Memorial Path. Thanks for your consideration!
Thank you for your comment. The Proposed Project includes a sewer pipeline and wastewater collection system. The design and construction of pedestrian or bicycle facilities are outside of the scope of the Proposed Project. Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town. Your recommendations have been noted and will be referred to the County as a potential feature for coordination with future project opportunities.

David Copp Aug 26, 2022 W36 1
It seems as though the Draft PEIR has been reasonably well considered. We will never know all of the impacts in
advance, but the benefits of the project seem to outweigh the impacts, and it needs to progress.

Thank you for your input. We appreciate all viewpoints and opinions expressed by our community. 2 We think the sewer coverage area should be expanded. We have a multifamily property at 5830 Greenthumb Lane,
which is just outside of the coverage area, even though it covers the area essentially across the street (Elliott Rd). We would like to have our property included, please. Thank you The Sewer Service Area for the Core Collection System includes the commercial core and most densely populated area of the Town. Properties outside of the Core Collection System coverage area and within Town boundaries are intended to have the option to consider connecting to the sewer system as part of the Extended Service Area.
1640
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Ward Habriel Aug 26, 2022 L6 1
First, the responsibility of Government is the safety and protection of its citizens; our basic rights of life, liberty and property. When you meet those basic rights; then, and only then, do you look for other benefits to the community that you govern.

So, the question is about the Town Govt. meeting the basic needs of the folks in Town. The basic services for public safety are police, fire, and emergency medical services. Then ask yourself if you feel safe with the current facilities and staffing. (Remember, the third fire station was never built, the hospital is gone, and our cops are stretched thin). And there is no plan for change in these vital areas. Having a sewer does not correct or improve the absence of the above.

We are no safer by having a sewer!
Thank you for your input. This comment has been considered, and is outside the scope of the PEIR. 2 Second, there is no good justification to change from a septic system to a sewer system. Septic systems have worked extremely well for many rural communities for many many years. In Paradise, we have had very few failed or questionable septic systems; but let me just highlight a few examples of addressing a 'questionable' system. Cozy Diner: The Town, (based on limited space concerns) wanted to close the restaurant; there was no room to extend the leach field and the volume produced at the diner was exceeding the capacity of the existing septic system.

Cozy management found a solution, agreed to spend a lot of money, and made the necessary improvements. Next, the Holiday Market leach field (it is under the asphalt parking lot) (which is not the best location for a leach field); Holiday was willing to spend a lot of money to dig up the old system and replace it with deeper drainage. It works just fine. Next, the MacDonalds Restaurant on Clark Rd. Here was another "questionable" leach field, and there was not enough property to expand it. MacDonalds Corp.
increased the parking lot size to accommodate additional leach field space (at a substantial cost). And lastly, the new Safeway Store on Skyway, they wanted to add a gas station and restaurant on the property, but there wasn't enough space for an extended leach field. So, Safeway Corp. bought additional acreage to be able to accommodate a larger leach field. Each of these examples show that whatever the concern is from the Town about a septic system, there was a remedy, if the property owner was willing to spend the dollars and improve the system. Have you ever heard of someone having an 'ailment' of any kind, because the septic system failed? Septic systems are not unsafe or unhealthy.

There are other CA communities with similar concerns that have never been forced by the local Govt. to re-do their septic systems.

We appreciate all viewpoints and opinions expressed by our community. Section 2.3.1 Project Need includes information from the Centers for Disease Control and Prevention (CDC), including: "Research on septic system failure is limited, but some research indicates that septic systems should be studied more carefully. “In 2013, the Centers for Disease Control and Prevention (CDC) looked at nearly four decades of data on disease outbreaks linked to drinking untreated groundwater. The data was drawn from 248 outbreaks that were reported to the CDC between 1971 and 2008. Of the 172 cases in which a source of contamination was determined, 67 percent were linked to a septic tank or an improperly designed well” (Circle of Blue 2015)." Further, Section 2.3.2 Project Objectives and Goals provides references and information from the State Water Resources Control Board and engineering findings that demonstrate the value of changing to a contained sewer system. In addition, examples noted in your comment focus on very large corporate entities that have surplus resources; however, small businesses that would also support diverse economic growth in the Town may not have the capital to fund such property expansions that, as you note, can be quite substantial in cost. Therefore, small businesses may not be able to open new retail stores or restaurants, which can then limit opportunities for regrowth of the downtown retail area. 1641
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
3 Looking at the benefits to having a sewer system, is not based on what problems you get rid of (see above); but
consider the possible benefits to collection sewerage,
treating it, and using the effluent. Many folks thought that if the Town got some benefit from having a sewer system,
then maybe it was a good idea. There are samples all over CA where treated wastewater is used for irrigation
(especially on large grass areas - schools, playgrounds, golf courses, cemetery districts, etc.) Anywhere that reclaimed water can be used reduces the amount of potable water
used. Some communities have plumbed all the fire hydrants with treated wastewater. But that is not the plan for
Paradise (there was an original plan to have local treatment), but the current proposal is to run a pipe (nearly 20 miles) from Paradise to Chico. The wastewater from Paradise
would end up at the Chico treatment plant. The discharge of treated wastewater goes into the Sacramento River; ergo, neither Paradise nor Chico get a benefit from our
wastewater.

We appreciate all viewpoints and opinions expressed by our community. This is a statement of opinion and the subject matter is responded to in depth in the commenter's remaining responses and in responses to Mr.

Ripley below.
4 And, there are costs that go along with having a sewer system: a cost to get hooked up (including, the digging up the street), a cost to discharge, a permit fee (annually or monthly), and, is that cost then passed on to consumers? The Town is seeking grant funding for the design, right of way and construction phases of the project. The sewer pipe and lateral to the property line will be covered by the project costs. When the septic system switches over to sewer, the cost to connect the commercial facility to the sewer system will be borne by the parcel owner. The parcel owner will also be responsible for monthly sewer service fees once connected to the sewer. However, costs are not detailed in the PEIR, as they will be determined by the Town once the PEIR is approved and funding is identified.
5 Would all the commercial facilities with new sewers raise thier prices to cover the costs of using a sewer?
The Town is seeking grant funding for the design, right of way and construction phases of the project. The sewer pipe and lateral to the property line will be covered by the project costs. When the septic system switches over to sewer, the cost to connect the commercial facility to the sewer system will be borne by the parcel owner. Commercial facilities would determine pricing for their merchandise/services. 6 Would Paradise folks go to Magalia (with no sewer) and shop to avoid the price increases in Paradise?
We appreciate your thoughts and opinions, but can not forecast customer behavior, nor what commercial owners will charge for services.
7 Wouldn't it be nice if there was a plan to use treated wastewater here in Paradise to irrigate our new golf course? This comment has been considered, and is outside the scope of the PEIR. 8 Other comments: there are septic systems in CA, where there is no requirement for an inspection every ten years. This comment has been considered, and is outside the scope of the PEIR. 9 There is a summary of numerous comments/complaints I
received since the question of a sewer for Paradise came up seven plus years ago. But, remember, this happened before and the Town Council was 'recalled'!
This comment has been considered, and is outside the scope of the PEIR. 1642
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Maurine Hansen Aug 26, 2022 W37 1
I just finished paying off a $22,000.00 hookup bill in another address. We were not in the zone to be on the first to hook up from septic, to sewer, so were required to wait. We were not able to hook up, but years later we were required to and the price hugely increased. We were told the cost would be even more if we didnt do it "now". I now live in a zone that is not part of the first hook ups. Does that mean another huge financial cost to me, in the future?
The Town is seeking grant funding for the design, right of way and construction phases of the project. The sewer pipe and lateral to the property line will be covered by the project costs. When the septic system switches over to sewer, the cost to connect the commercial facility to the sewer system will be borne by the parcel owner. The parcel owner will also be responsible for monthly sewer service fees once connected to the sewer. Costs for connections within the Core Collection System area or at the Expanded Collection System area are not evaluated in the PEIR, as they will be determined by the Town once the PEIR is approved and funding is identified.

Roger Cole Aug 28, 2022 W38 1
The proposal to hook Paradises new sewer system to an expanded Chico sewer water treatment system at the Sacramento River sounds good at first. It saves money and utilizes efficiently excess capacity of said water treatment facility. It also simplifies Paradise’s process into a pipeline construction project.

However, as we all have noted from the years of the long ongoing drought, the foothills need every drop of water they can get and /or save or reuse. This plan will export millions of gallons of water from Paradise, and therefore is not good. Instead the wastewater should be treated and returned as close as possible and feasible to the water area it comes from.

The single best feature of the existing septic tank/reach line system has been retention of treated wastewater in the
ecosystem.

A similar goal can be accomplished by constructing a primary sewage treatment plant in Paradise followed by a final treatment in a constructed wetland polishing system. This will produce many local benefits.

After the wetland the water can flow to another reservoir location or allowed to be absorbed into the ground or flow through a stream, other kind of recharge. The benefits of retaining water cannot be overestimated. Streams with added wastewatereffluent can improve water quality and support water re-use, while creating habitat and providing urban amenities The Cost–benefit analyses of stream-flow augmentation projects many times fail to account for the full value of ecosystem services provided, including renewed habitats and enhanced urban amenities. (References provided in original attached letter) Thank you for your input. We appreciate all viewpoints and opinions expressed by our community. As required by CEQA (CEQA Guidelines Section 15126.6), the City has reviewed alternatives and examined thoe which meet the goals of the project and reduce the potential for environmental impacts. One of the goals of the Proposed Project (Section 2.3.2) is to address the public health threat by removing individual septic systems. Other goals discussed in the same section noted above, was to allow return of population, and to provide for affordable housing. The local treatment option has been reviewed a number of times (Section

2.2) and each time it has been determined that the regional connection ws recommended as the best longterm solution for the Town (Section 2.2.1). Therefore, in 2020, the Regional Board stated that "it is the Board's strong recommendation for the Town to conserve limited resources and focus its feasibility analysis on the regionalization option" (RWQCB 2020, as referenced in Section 2.2.2). Further, Chico City Code Section

15.40.285, Regulation of Waste Received from Other Jurisdictions , requires that any project with another municipality which would utilize the Chico sanitary sewer system requires an intermunicipal agreement (IMA) and sets out the requirements for such agreement.
1643
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
Butte County Department of
Public Works Aug 29, 2022 L7 1

1. Permitting Authority: The PEIR acknowledges that the details of the required permitting and agreements that will be needed for the construction and ongoing operations of the Export Pipeline System within the County right-of-way have yet to be determined. Table ES-1 summarizes the
anticipated required project permits and approvals for
agencies and jurisdictions (p. xxiv). However, the table does not specify permitting authority for Butte County.

The need for obtaining encroachment permits for work
within the County rights-of-way is discussed several times in the PEIR, including Section 1.5 Issues to be Resolved (p.10).

Butte County is a Responsible Agency based on its
discretionary approval power over certain aspects of the project including permitting authority which should be
specifically recognized in Table ES-1.

As discussed in the Draft PEIR in Sections ES1 and 1.1, which indicate "Butte County… [is] considered [a] Responsible Agenc[y] under CEQA based on their discretionary approval over aspects of the Proposed Project and their utilization of this PEIR for their CEQA compliance. Specifically... The County will rely on this CEQA analysis to make its decision on project elements impacting County-owned and maintained rights of way".

More specific language (see new bolded text below) clarifying Butte County's permitting authority has been added to the "Permit, Approval, or Clearance" column in Table ES-1 and Table 1-1 in the Final PEIR, to read:

Approval for installation and operations and maintenance of the export pipeline and any appurtenant facilities located within County rights of way; specifically for encroachment permits within County rights of way.
2 2. Impact HAZ-6 Impact and Analysis: Section 3.9 Hazards and Hazardous Materials does not appear to provide
adequate discussion and analysis on how the proposed
mitigation measures will reduce Impacts HAZ-6 and HAZ-7 to a less than significant level.

Impact HAZ-6: Impair implementation of or physically
intefere with an adopted emergency response plan or
emergency evacuation plan
Impact HAZ-7: Expose people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving wildland fires
The Department requests that additional discussion and
analysis should be provided in the PEIR to demonstrate how the proposed Mitigation Measures, specifically MM-HAZ-3, MM-HAZ-4, and MM-HAZ-5, will reduce the identified
significant impacts to a less than significant level. For example, further discussion providing information on the importance of a Rapid Demobilization Plan and how rapid demobilization will be critical during an emergency would support the proposed mitigation measures.

In response to the comment, the following text has been added or updated to Section 3.9.4.6, Mitigation.

Per Section 3.9.2.3, any contractor on the project, whether in the Town, City or County, will be required to implement procedures defined in the Butte County Local Hazard Mitigation Plan Update, as adopted and annexed by the Town of Paradise. As stated in Section 3.9.2.3, The Butte County Local Hazard Mitigation Plan Update (Butte County 2019b) includes an assessment of the county’s risk and vulnerability related to natural and other identified hazards and a comprehensive mitigation strategy which includes actions and projects designed to mitigate or reduce the impacts of those hazards and to increase community resiliency.

The Proposed Project will be held to the strategies in the Butte County Local Hazard Mitigation Plan Update. In addition, the same section also refers to the Butte County General Plan 2030 (Butte County 2012), noting that the Town would be held accountable to multiple goals and associated policies related to hazards and hazardous material, such as: "Policy HS-P15.3: Emergency access routes shall be kept free of traffic impediments." Finally, Section 3.9.2.3 also states that the Town will be held to their own policies presented in drafts of the "Town of Paradise General Plan, Safety Element (2022) and Hazardous Waste Management Element (2022)". Policies within these elements include: Policy SP-1: New and unmitigated land use development shall not cause the police and fire protection services emergency response times to fall below the service levels established by this plan, and Policy SP-2: Through the development review process, adequate roads shall be required to be constructed and/or improved for emergency vehicle access, particularly in high wildland fire hazard areas. Proposed Project mitigation measures, discussed below support implementation of the County and Town policies by ensuring evacuation routes would not be blocked during an emergency, that emergency response services have access to major routes, which is critical during an emergency, and that there is a plan for rapid demobilization in a situation requiring evacuation. Further, for each of the three noted mitigation measures, the following has been added to restate existing requirements prior to describing mitigation measure: The Proposed Project will be held accountable to the Butte County Local Hazard Mitigation Plan Update and policies included in the Butte County General Plan and the Town’s draft Safety Element (2022) and Hazardous Waste Management Element (2022).
1644
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
3 Both the Rapid Demobilization Plan and Evacuation Warning Procedures should be provided to Butte County Public
Works for review as part of the encroachment permit
application process.

In addition to the Town's commitment to the Butte County Local Hazard Mitigation Plan Update, per commenter's request, materials developed during implementation of MM-HAZ-4 (Rapid Demobilization Plan) and MM-HAZ-5 (Evacuation Warning Procedures) will be provided to Butte County Public Works during the encroachment permit application process.

City of Chico Public Works
Department
Aug 29, 2022 L8 1
The City understands that the Paradise Sewer Project (Project) is a critical component to the Town of Paradise's (Paradise) overall Camp Fire recovery effort and that the design of the project is in an early phase. Given the scope of the Project, the alignment of certain segments of the proposed pipeline, the location of associated equipment located within or adjacent to the City limits and Sphere of Influence, and the pipeline's ultimate connection to the City's Water Pollution Control Plant (WPCP), we look forward to coordinating closely with Paradise during the design, construction, and implementation phases of the Project.

Close coordination will be particularly important for numerous reasons, including, but not limited to: 1) Avoiding potential conflicts between the Paradise Sewer Project and the City's proposed infrastructure projects that are located along or adjacent to the Project's proposed alignment (e.g., the P-18 sewer trunkline segments located within the railroad grade in South Chico and within the Entler Avenue and Midway rights-of-way, the intersection improvements at Hegan Lane and Midway, etc.). 2) Ensuring collaboration regarding the design of those project components (e.g., the Transition Chamber located off lower Skyway, the Flow Control and Metering Structure proposed near the WPCP, and all connections to the City's existing and proposed facilities) that are located within or adjacent to the City to avoid and minimize the potential environmental impacts (soil
contamination, water pollution, odors, etc.) that could result from system failures.

Thank you for your comments. The Town also looks forward to closely coordinating with the City during the design, construction, and implementation phases of the Project. The Town agrees that close coordination will avoid and minimize the potential environmental impacts that could result from conflicts during construction or system failures at new infrastructure. Further, as discussed in Section 2.8 Proposed Operations and Maintenance, "The... Sanitary Sewer Systems General Order... (SSSGO) applies to all publicly owned sanitary sewer collection systems in California with more than one mile of sewer pipe... and would be overseen by the RWQCB during permitting the proposed project under the (SSSGO). Since the Town’s collection system will have more than one mile of sewer pipe, and the Town will own and operate the collection system, the Town will comply with the SSSGO. Per the SSSGO, and subject to its terms, the Town will need to develop a sewer system management plan. The sewer system management plan will include policies, procedures and activities covering the planning, management, operation and maintenance of the collection system." It is anticipated that the Town, County and City will be coordinating as this plan is being developed. Further, Chico City Code Section 15.40.285, Regulation of Waste Received from Other Jurisdictions , requires that any project with another municipality which would utilize the Chico sanitary sewer system requires an intermunicipal agreement (IMA) and sets out the requirements for such agreement. 2 The City appreciates Paradise's inclusion of the permitting requirements in the PEI R, including the Sanitary Sewer Systems General Order and associated conditions requiring the preparation of a Sewer System Management Plan and an Overflow Emergency Response Plan that will be both
reviewed and approved by the City of Chico. These
documents will provide the policies, procedures and
activities covering the planning, management, operation, and maintenance of the collection system. In addition, these efforts will result in emergency response planning to identify measures to protect public health and the environment,
particularly as they relate to an inadvertent release of sewage.

The Town agrees with the City's statements, and again, will be coordinating with the City during development of the Sewer System Management Plan. Further, the Town will abide by Chico City Code Section 15.40.285, Regulation of Waste Received from Other Jurisdictions , which requires that any project with another municipality which would utilize the Chico sanitary sewer system requires an intermunicipal agreement (IMA) and sets out the requirements for such agreement.
1645
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
3 According to the PEIR, wastewater studies prepared for the Town determined the Project export pipeline system design should be based on an estimated average wastewater
conveyance and treatment need for the Paradise sewer
service area to be 0.464 million gallons per day (mgd). Due to the conceptual nature of the inclusion of the entire Extended Collection System outside of the Core Collection System, as identified in Figure ES-1, it is unclear at this time if serving the greater area would have the potential to exceed the maximum design of 0.464 mgd. Any future
expansions should be analyzed and agreed to by the City to prevent any unforeseen wastewater exceedances that could negatively affect pipeline and plant capacities.

The 0.464 million gallon per day estimated discharge from the Town of Paradise to the City of Chico Water Pollution Control Plant is the agreed upon discharge, and an effective capacity limit. The Principles of Agreement developed between the Town of Paradise and City of Chico, which are currently being drafted into an Inter-Municipal Agreement to be adopted by the Town Council and City Council, include the maximum discharge amount and methods in which this amount would be monitored and controlled by both the Town and City. In addition, the Principles of Agreement state “The Town and the City agree to prohibit future connections to the export pipeline in the portion of the pipeline that sits outside of the Town limits or City limit.” (www.paradisesewer.com, 1st Draft Principles of Agreement version 7, 21-March-2022). Finally, the extent of area and associated flow that could be served by the sewer system within the Town (ie., the core collection system area alone, or expanded to include the extended collection system area) would be forecasted in advance to determine when and if the 0.464 million gallon per day allotment could be reached.

At such a time, the Town of Paradise would approach the City of Chico in a similar fashion to determine if a mutual desire existed to accept additional flows from the Town based upon the City’s treatment plant capacity, needed connection payments and other factors – similarly as the original 0.464 million gallon per day agreement is currently being negotiated.
4 The City looks forward to collaborating with the Town of Paradise and its professional sewer design team in the
development of the project and looking for partnership
opportunities that will benefit both communities.

Thank you for your comments.

Laurie and Jim Noble Aug 29, 2022 L9 1
(handwritten letter - transcribed) Public Information - There needs to be a very accessible public forum of information regarding the Town of Paradise Sewer Project. Very few
people have participated and know of plans to date
regarding this immense project. Blue Flamingo could be a group to widely disseminate information. There are
numerous and very complex issues to deal with as this
project moves forward. Residents should have opportunity for input.

Thank you for your comments and reference to Blue Flamingo. The Town has made information available on multiple platforms, to provide information to the community and as required by CEQA statute: 1) the Town has put up a website to include all information related to the Proposed Project (https://paradisesewer.com); virtual public scoping meetings were held in May 2021. 3) In support of the scoping meetings and corresponding comment period, social media and email blasts went out before and after the virtual meetings, postings were made in newspapers (Paradise Post and Enterprise-Record) and project information regarding the meetings and solicitation of public comments were posted at multiple public locations.

Similarly, public meetings were held in August 2022 during public review of Draft PEIR. Many of the same outlets were used in this draft release outreach, but "live" public meetings, rather than virtual, were held in Paradise and Chico.
2 (handwritten letter - transcribed) Water Retention: We are hearing from individuals a very strong concern regarding grey water and stormwater retention. Both have been a
significant part of Paradise's groundwater for many decades.

The installation of signal lights and reconfiguring the intersection at the top of Clarke Road directed stormwater runoff to be diverted from the triangle of land between Skyway Rd and Clark. Trees on that property died over the course of a couple of years. They were cut off from their supply of water. As streets throughout town are repaired and upgraded, will the storm drains immediately run off the ridge or be directed to catchment basins? What are the
details of all the plans?
Thank you for your input. The Town is considering all comments in the development of detailed design. 1646
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
3 (handwritten letter - transcribed) Future Economic
Development/Commercial Development: is on hold until a
sewer system is in place. What is the time line for installation of the system includiing connection to west of Chico Sewage treatment Plant? How does it fit in with rebuilds and
repaving of roadways?
As included in Section 2.6 Proposed Schedule of the Draft PEIR, construction of the Core Collection System is proposed to be constructed between August 2024 and May 2026. The Export Pipeline System is proposed for construction between August 2024 and July 2026. The Extended Collection System would be constructed caseby-case and could occur 2026 through 2056. In terms of roadways, repaving would occur consistent with Town policy, such that Town paved areas that are impacted by the Proposed Project will be repaved in full lane widths, to avoid trench patchwork. For those roadways not within the Town, the County or Chico would have jurisdiction over any repaving requirements for those sections of road. 4 (handwritten letter - transcribed) Cal Poly: water/design ideas presented by students in Spring of 2019 should be revisited. The(y) had some good ideas - how to deal with terrain elevations, as an example.

Thank you for your input. The Town is considering all comments in the development of detailed design. 5 (handwritten letter - transcribed) Santa Cruz: converting from septic tanks to sewer system - abandoned tank --> sink holes - legal disclosures for property sales - Town of Paradise policy - need to deal with.

The Town is considering all comments in the preparation of the Final PEIR and development of detailed design.
6 (handwritten letter - transcribed) Davis: Sewer Issues having to clean to keep system moving. We appreciate all viewpoints and opinions expressed by our community. 7 (handwritten letter - transcribed) Drought: Issues need to be considered. This is not just in Paradise, in Butte County, in the wester states, in North America, it is a global worldwide issue and needs to be dealt with now.

We appreciate all viewpoints and opinions expressed by our community. 8 (handwritten letter - transcribed) Water Added: to make the sewer system flow clear to the Sacramento River area
treatment plant is possilby inappropriate be it fresh potable water added or grey water.

We appreciate all viewpoints and opinions expressed by our community. 9 (handwritten letter - transcribed) Pump up Sewage: from low lying areas of the community to the main lines may be restrictive and financially prohibitive.

Section 2.5.1 of the Draft PEIR provides the preliminary design for the Core Collection System: "The Core Collection System would consist of approximately 157,000 feet of 6- to 8-inch-diameter gravity sewers, 29,000 feet of 2- to 4-inch-diameter force mains, and up to 28 pump stations. The pipelines would be buried approximately 3 to 15 feet below the ground surface, depending on local topography and sewer system design features and constraints." These 28 pump stations would provide the necessary pressure to transition the sewage to the Export Pipeline System. There are no pumps included in design of Export Pipeline System, which depends on gravity flow.
10 (handwritten letter - transcribed) Land installations: Another drought issue the Town of Paradise could and should deal with immediately is lawn development/ installation. Curtail or limit it immediately there is no water, Mount Shasta is bare of snow except for a few glacial remains.

This comment has been considered, and is outside the scope of the PEIR. 1647
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
11 (handwritten letter - transcribed) Draft Program
Environmental Impact Report, pg 429 Hydrology and Water Quality HYD-2: is in need of more evaluation. The removal of all waters from households and businesses could have a very long lasting impact. Details of well level is swayle when opened to install solar water pump was about 6" from
ground level during drought year when wells were failing in the Valley.

The Town believes it conducted sufficient analysis in Section 3.10 to meet the requirements of CEQA. All findings were disclosed and discussed in Section 3.10.4. To clarify one point, the project is limited to sewer effluent, not any potable water, which is managed by Paradise Irrigation District; therefore, there would be no removal of "all waters from households and businesses". At the time of plan preparation, Paradise Irrigation District (which services much of the Town) is not within a designated basin and not subject to compliance with the Sustainable Groundwater Management Act (SGMA). The nearest adjacent basin is the Vina Groundwater Subbasin, of which the Paradise contribution is negligible. Groundwater existing conditions are described in Section 3.10.1.3 Groundwater.

Dana Ripley August 29, 2022 L10 1
The opportunity to provide this public comment on the
Paradise Sewer Project Draft ProgramEnvironmental Impact Report (PEIR) is appreciated. As you are aware, I have been advocating for nearly two years a local water reuse project in Paradise as an alternative to the 18-mile wastewater export identified as the superior project in the draft PEIR. On November 30, 2021 I submitted to your office a white paper entitled Town of Paradise, Butte County CA, Sewer, Water Reuse and Wildfire Defense Integrated Plan (SWRWD Plan).

That white paper is included in this public comment as
Exhibit A. (Exhibit A attached with comment letter following spreadsheet)
Thank you for your input. We appreciate all viewpoints and opinions expressed by our community. The document you label a "white paper" has been referred to here as "Mr. Ripley's Sewer, Water Reuse and Wildfire Defense Integrated Plan (SWRWD Plan)" and was submitted along with proposal to the project team for review. In the document, engineering and other services are offered by you for the project that is advocated for in the SWRWD Plan, which implies a vested business interest in selection of the SWRWD option, which should be recognized. Throughout our responses to comments below, we will address the points brought up in comments that related to the SWRWD Plan. As explained, the DEIR discusses those alternatives which are reasonable and can adequately achieve the basic objectives and goals of the project, while reducing the proposed project's potential for impacts to the physical environment. Comments and information collected in Mr. Ripley's SWRWD option do not show that the chosen alternatives manifestly are unreasonable. Further, the Town's determination to eliminate the local options was discussed and reasons identified are tabled in Section 5.2 of the PEIR; it is not required by CEQA for the Town to re-defend its findings as discussed in the PEIR. Per Laurel Heights, supra, 47 Cal.3d at p.393 as referenced in Save Our Access-San Gabriel Mountains vs Watershed Conservation Authority, supra, 68 Cal.App.5th 8 , CEQA Guidelines define "substantial evidence as enough relevant information and reasonable inferences from this information that a fair argument can be made to support a conclusion, even though other conclusions might also be reached." Further, the Laurel Heights court "cautions that a court may not set aside an agency's approval of an EIR on the ground that an opposite conclusion would have been equally or more reasonable.

CEQA's purpose is to compel government to make decisions with environmental consequences in mind" (Laurel Heights, supra, 47 Cal.3d at p.393 as referenced in Save Our Access-San Gabriel Mountains vs Watershed Conservation Authority, supra, 68 Cal.App.5th 8 ). The Town's proposed project was not found to cause any environmental consequences after applying appropriate mitigation measures (Section 3.20 of the PEIR). Having said that, the Town has decided to respond to Mr. Ripley's comments, to the extent the comments are supported by fact and documented calculations. 2 In light of the broad implications of the export versus local reuse options for Paradise, it may be instructive to consider the California Environmental Quality Act (CEQA) Guidelines which includes as an advantage of the “Program” EIR the following: Allow the lead agency to consider broad policy alternatives and program-wide mitigation measures at an early time when the agency has greater flexibility to deal with basic problems or cumulative impacts. (All references used in text can be found as part of original letter and exhibits [attached]).

Agreed, the Town has and will continue to adhere to CEQA Guidelines Section 15168 (b)(4). In addition, Section 15126.6 (a) states: "An EIR need not consider every conceivable alternative to a project..." and "an EIR shall describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project..." (15126.6(a)). In findings of Save our Access-San Gabriel Mountains vs Water Conservation Authority 68 Cal.App.5th 8 , in discussion of the number of alternatives evaluated, the court found: "The rule of reason (in deciding which alternatives to include) 'requires the EIR to set forth only those alternatives necessary to permit a reasoned choice' and to 'examine in detail only the ones that the lead agency determines could feasibly attain most of the basic objectives of the project.'" (Bay-Delta, supra43 Cal.4that p 1163 was used as reference in court findings). 1648
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
3 Area of Known Controversy #1: Growth Inducing Impacts:

The draft PEIR, Section 1.4, recognizes that there may exist growth inducing impacts specifically in the City of Chico and rural Butte County outside of Town and City limits. In a November 4, 2020 letter from the Central Valley Regional Water Quality Control Board, Region #5 (R5) addressing the local facility versus regional alternatives for Paradise, the statement is made that the “Pipeline to Chico can be costeffectively sized to accommodate a large range of flows.” In a tabulation of pipe carrying capacities of the 10.5 mile 12” diameter export pipe force main along the valley floor (from Skyway at Butte Creek to the Chico WPCP) utilizing
reasonable flow velocities ranging from 3 feet per second (fps) to 7 fps, the available capacity could potentially be as high as 1.758 million gallons per day (mgd) average daily flow (ADF). This capacity is approximately 3.8 times the

0.464 mgd ADF capacity allocated to Paradise in the intermunicipality agreement between Chico and Paradise considered as part of the draft PEIR. The tabulation indicates that up to approximately 1.3 mgd ADF of wastewater export pipe force main capacity could be available to undeveloped properties in southeast Chico as well as rural Butte County along the pipeline alignment. (All references used in text can be found as part of original letter and exhibits [attached]).

In reference to the first sentence (bolded in comment), the reference to Section 1.4 and extracted text is misrepresented. The Draft PEIR and the Town do NOT "recognize(s) that there may exist growth inducing impacts specifically in the City of Chico and rural Butte County outside of Town and City limits". Section 1.4 Areas of Known Controversy in the Draft PEIR (which is the section referenced in the comment) does state that these potential impacts "have been raised by other agencies, the public, or other stakeholders" and that the issue has been previously communicated to the Town or identified in the PEIR scoping process - there is no statement in which it could be inferred that the Town recognizes this issue may, in fact, be valid and Section 4.4 Growth Inducing Impacts speaks specifically to the Town's rebuttal of the potential for inducement in the City or Butte County, stating: "There would be no precedentsetting action that might trigger expansion of the Town as the proposed sewer system would not change Town boundaries and does not allow for service beyond those boundaries. As such, there would be no resulting development or encroachment to isolated or adjacent areas of open space. Further, the Proposed Project would not trigger unplanned expansion of the existing Chico WPCP. The proposed sewer service is within the current capacity, facility function, and purpose of the Chico WPCP." In addition, the engineering work completed by HDR did not include provision for any such additional connections to the Gravity Force Main. Finally, the Principles of Agreement developed between the Town of Paradise and City of Chico, which are currently being drafted into an InterMunicipal Agreement to be adopted by the Town Council and City Council, states “The Town and the City agree to prohibit future connections to the export pipeline in the portion of the pipeline that sits outside of the Town limits or City limit.” (www.paradisesewer.com, 1st Draft Principles of Agreement version 7, 21-March-2022). In conclusion, as noted multiple times in the Draft PEIR and demonstrated above, the scope of the Draft PEIR and any CEQA clearance that it would provide would be limited to infrastructure to support sewer connections within the Town of Paradise boundaries.

In regard to the export pipeline, the section of the export pipeline referred to in the comment is the Gravity Force Main. Again, the comment appears to relate to a concern about additional connections happening along the export pipeline, between the Town of Paradise and the Chico Water Pollution Control Plant. As stated in Section 2.5.2: , “A single 12-inch diameter pipe is needed for the Gravity Force Main for pipe to flow full, creating a beneficial force main based on the hydraulic behavior of the sewer (eliminating the need for a pump station, which is not a part of this system), so the effluent can reach the Chico WPCP. No pump stations would be required” and “A modulating plug valve would keep the Transition Chamber and Gravity Force Main sections full, to maintain the hydraulic function of the Gravity Force Main Section. The Gravity Force Main was sized based on a differential head criteria, not based on a velocity criteria, such as the 3 to 7 feet per second figures stated in the comment. 1649
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
4 Area of Known Controversy #2: Reconsideration of Local Treatment Option: The draft PEIR, Section 1.4, recognizes potential reconsideration of local treatment plant construction instead of the proposed connection to the Chico WPCP, which was evaluated in 2017 and 2020.

In both Bennett 2017 and HDR 2020, the local treatment alternatives described did not consider distributing recycled water to all parcels served by the sewer system. Conversely, the SWRWD Plan considers extensive urban reuse serving all collected parcels thereby adding a water supply component to PID’s portfolio enhancing its drought preparedness and supply resiliency. As described in the white paper, the dual distribution included in the SWRWD Plan has multiple benefits including 1) delivery of non-potable recycled water for residential, park, sports, commercial, and buffer area irrigation, 2) seasonal shallow aquifer recharge in winter months, 3) automated community-scale wildfire defense for essential facilities, public/private buildings and evacuation routes, 4) high pressure supplemental water supply for fire suppression, 5) protection of Paradise Irrigation District’s (PID) potable distribution from depressurization in the event of another extreme wildfire event, and 6) beneficial use of nutrients inherent in municipal wastewater. The draft PEIR, Section 5.2.1, Table 5.2- 1 Local Alternatives and Reasons for Elimination from Consideration, lists as Local Alternative #3: Local WWTP with Water Recycling with the Town for Local Reuse and Wildfire Defense. In response to the 12 bullet points asserting infeasibility, included in this public comment is Exhibit 2 providing a rebuttal to each point individually in table format. (Exhibit 2 rebuttals are considered separately beginning with Comment #9 below; all references used in text can be found as part of original letter and exhibits [attached]).

Similar to the response in Mr. Ripley's Comment #3, the bolded text in this comment has been misrepresented and it is not true that the Draft PEIR or the Town recognizes this statement as accurate; in fact, the Town rebukes reconsideration of the local option and provides reasoning for the elimination in Section 5.2.1, Table 5.2-1.

Thank you for sharing your document (referred to in the responses as "SWRWD Plan" - see response to L10-1) that provides your personal viewpoint regarding one of multiple local project options that have, in different forms, been considered by the Town. As noted in the comment, the “Local Treatment Option”, which in various forms has been assessed multiple times over the past 10-15 years, was eliminated from consideration and was not carried through the Draft PEIR as an alternative, for those reasons identified in Section 5.2.1, Table 5.2-1. CEQA Guidelines state that an EIR: "must describe a range of reasonable alternatives to the project... which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project..." (CEQA Guidelines Section 15126.6 (d)(a); italics added). Save Our Access-San Gabriel Mountains vs. Watershed conservation Authority (2021) 68 Cal.App5th 8 at p.18 (Save Our Access) found that "... plaintiff (hadn't) explained how any of the alternatives would 'avoid or lessen one or more of (the project's) significant impacts...”. “As the WCA (Watershed Conservation Authority) board found, no significant impacts were identified that could not be avoided or reduced to a less than significant level." (Save Our Access, proceedings at p.18 ). This same condition applies to the Paradise Proposed Project, which realized no significant impacts during analysis that could not be mitigated to a less-thansignificant level. Mr. Ripley’s letter and all other public comment letters received and responded to in this spreadsheet do not, in fact, present any opposition to specific Draft PEIR significance findings with or without mitigation incorporated, as appropriate. Further, with reference to South of Market Community Action Network vs. City and County of San Francisco (2019) 33 Cal.App.5th pp. 321, 345 (South of Market) findings, Save Our Access' elaborates; courts found that "CEQA 'does not require that an agency consider specific alternatives that are proposed by members of the public or other outside agencies' " (Save Our Access, supra, 68 Cal.App5th 8 at p.17 with reference to South of Market proceedings pp. 321, 345).

Additional discussion on the feasibility and reasoning for elimination of this specific option is included in response to Mr. Ripley's comment #1 above and #9 below.
1650
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
5 Lost Opportunity for Recycled Water: Assuming the export pipe force main has an ADF capacity of about 1.8 mgd, the potential lost opportunity for urban water reuse in Paradise and southeast Chico could be as much as 2,000 acre-feet per year (afy). On August 11, 2022, Governor Newsom announced California’s Water Supply Strategy, Adapting to a Hotter, Drier Future. Part of the Strategy is to increase urban water recycling in coastal and inland communities to about 0.8 million acre-feet per year (MAF) by 2030 and to about 1.8 MAF by 2040. Urban water reuse in Paradise and southeast Chico would clearly be consistent with the Strategy and likely would be eligible for significant grant funding included in the 2021-2022 $5.2 billion state appropriations for California water systems including water recycling. In its 2020 Urban Water Management Plan (UWMP), PID indicated that the community will continue to work to examine the viability of a centralized sewer system and any associated opportunities to develop a recycled water supply as it continues to recover from the Camp Fire and look to the future of rebuilding and redevelopment of Butte County. The 18-mile export plan would foreclose on any opportunity in the foreseeable future to develop a recycled water supply in Paradise. In similar fashion, Cal Water-Chico District indicated in its 2020 UWMP that Cal Water continues to actively investigate recycled water opportunities, such as satellite, or decentralized, recycled water generation at select areas within the Chico area, for use in that area. The 10.5-mile export force main pipeline would likely also foreclose on Cal Water’s ability to a develop recycled water supply in southeast Chico in the foreseeable future. In both Paradise and southeast Chico, the export pipeline would represent a lost opportunity to develop local recycled water resources that might otherwise be available. This would be inconsistent with the Governor’s Water Supply Strategy to maximize alternative urban water supplies, including recycled water for non-potable urban demands, for a more secure and resilient water supply future. (All references used in text can be found as part of original letter and exhibits [attached]).

In order to best understand calculations and comparisons presented in this comment and others, it may be easier to use consistent measures. Therefore, if you convert 0.464 million gallons per day (0.464 MGD) of Paradise effluent (that is, the maximum proposed to be conveyed to the Chico WPCP in the Draft PEIR) to acre-feet per year, you have 520.09138 acre-feet per year of wastewater (www.convertunits.com/from/million+gallon/day+[US]/to/(acre+feet)+per+year). Once you then convert acre-feet per year to MILLION acre-feet per year, which is referenced in the Governor's strategy and other municipal and agency goals, the maximum wastewater to be conveyed for treatment to the Chico WPCP from Paradise is 0.00052 million acre-feet (MAF) per year. (https://citizenmaths.com/flow/520.0913772803632- acre-feet-per-year-to-million-acre--feet-per-year). This amount equates to 0.065% of the 0.8 MAF annual increase goals mentioned in comment that the Governor's strategic plan introduces, which would likely not be considered a significant input in isolation. It is agreed that this .00052 MAF would be conveyed to Chico and, as commenter states, would not be available for Paradise as recycled water. However, Paradise has no authority over how the Chico WPCP treats wastewater, and in the future, recycling of Chico WPCP effluent for secondary use in and around the Chico area could be considered by the WPCP. As stated in the Regional Water Board's letter of November 4, 2020 which is referenced in the Draft PEIR, "The City of Chico already provides recycled water for waterfowl habitat uses, and City staff have stated that expanded recycled water use would be desirable and may be pursued in the future. Revenue generated through regionalization with Paradise could make recycled water projects more feasible for Chico."Therefore, since the Governor's California Water Supply Strategy includes increasing urban water recycling generally "in coastal and inland communities", as you have noted, and given the Regional Water Board's findings noted above, implementation of this project does not represent a "lost opportunity", as the opportunity remains to develop recycled water treatment at the Chico WPCP where there are more available resources, if doing so becomes a viable option for them in the future.
1651
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
6 Issue to be Resolved: Butte LAFCo service extension approval: The draft PEIR, Section 1.5 indicates that Butte LAFCo’s approval of the 18-mile extension of sewer service by Chico to Paradise is an issue to be resolved. However, the required LAFCo approval may be in conflict with state Government Code as indicated by the Executive Officer’s letter of May 20, 2021 which states: Provisions for extension of service requests are found in Government Code §56133 and in Section 4.5 of the Commission Policies and Procedures. Service extensions outside of an agency's Sphere of Influence may only be approved by LAFCo if there is "an existing or impending threat to the health or safety of the public or the residents of the affected territory. (§56133(c)) . . . . . The City/Town will need to provide documentation/justification of the existing or impending public health and safety threat the extension of services would address. This is a critical prerequisite to the project as it is the only legally permissible justification available [emphasis added] to the LAFCo to approve a service extension request outside of an agency's (Chico) Sphere of Influence. Since an existing or impending threat to the health or safety of the public or the residents does not exist, it appears that Butte LAFCo cannot approve the sewer extension request even if it wanted to. The only path forward on this may in fact be a waiver by the state legislature and Governor similar procedurally to Assembly Bill 36 (Gallagher, 2021). Recognizing that the 18-mile extension request is contrary to the Governor’s Water Supply Strategy because it could potentially foreclose on up to 2,000 afy of urban water recycling, the Governor would likely not support the waiver legislation even if approved by the State assembly and senate. (All references used in text can be found as part of original letter and exhibits [attached]).

Govt. Code Section 56133 applies to the request to Butte County LAFCO for Chico to provide sewer services to the Town through the pipeline; the Town is outside the City's boundary and its sphere of influence:
(a) A city or district may provide new or extended services by contract or agreement outside its jurisdicƟonal boundary only if it first requests and receives written approval from the commission of the county in which the affected territory is located. (b) The commission may authorize a city or district to provide new or extended services outside its jurisdicƟonal boundary but within its sphere of influence in anticipation of a later change of organization. (NOTE: Chico City Code Section 15.40.285, Regulation of Waste Received from Other Jurisdictions , requires that any project with another municipality which would utilize the Chico sanitary sewer system requires an intermunicipal agreement (IMA) and sets out the requirements for such agreement. (c) The commission may authorize a city or district to provide new or extended services outside its jurisdicƟonal boundary and outside its sphere of influence to respond to an existing or impending threat to the health or safety of the public or the residents of the affected territory, if both of the following requirements are met: (1) The enƟty applying for approval has provided the commission with documentation of a threat to the health and safety of the public or the affected residents. (2) The commission has noƟfied any alternate service provider, including any water corporaƟon as defined in SecƟon 241 of the Public Utilities Code, that has filed a map and a statement of its service capabilities with the commission.

In Section 2.2, the EIR discusses the existing threat to the health and safety of the public and Town residents from the existing septic systems as follows: "Failed septic systems can release untreated wastewater into groundwater at the ground surface or cause pipe failures in buildings, resulting in environmental degradation and public health risk due to water contamination or exposure to untreated wastewater." Section 2.2 cites multiple studies which assess the public health concerns related to failing septic systems, concluding: "Concurrent to and since the Town’s numerous wastewater management studies, public health […] impacts associated with septic system usage continue to persist." In regards to comment on the Governor's Water Supply Strategy, it is important to note that it is a strategy and policy document, rather than a law. Further, the Water Board currently has water reuse policy and regulations in place (https://www.waterboards.ca.gov/water_issues/programs/recycled_water/), and still issued its 2020 Evaluation of Wastewater Treatment Plant Options letter to Paradise with those requirements in place and full awareness of the reuse issue, as can be seen from the letter's reference to recycled water and Chico (https://paradisesewer.com/wp-content/uploads/2021/04/2020- Central-Valley-Regional-Water-Quality-Control-Board-Alternatives-Analysis.pdf). 1652
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
7 Scalable to Sewer Entire Town: The export project as
proposed in the draft PEIR limits the Paradise wastewater contribution to the Chico WPCP to 0.464 mgd. This limits sewer service to about 1,500 residential and commercial parcels within the sewer service area (SSA). The SWRWD
Plan, conversely, is scalable to whatever service area
Paradise chooses long term, including service to all 10,600 parcels served by PID pre-fire. This would be consistent with a local Paradise Post press report stating: (Congressman Doug) LaMalfa pointed to the sewer as an essential
infrastructure need for Paradise. “You know, a portion of this is going to help with that longtime need for a sewer system to this town, which unlocks a lot of possibilities for (Paradise),” he said. He also pointed out that as Paradise rebuilds, it can be part of an important part of California’s need to build more housing, pointing out that California is

2.5 million units short of what it needs. For context on the limitations with sewer service only to within the SSA, the draft PEIR states: Prior to the Camp Fire, which almost completely destroyed the town in 2018, Paradise was the largest unsewered community in California. This metric
would likely remain unchanged with the 18-mile export plan serving only the SSA – Paradise would still be the largest unsewered community in California since the SSA includes only about 14% of the permitted parcels within the Town. (All references used in text can be found as part of original letter and exhibits [attached]).
- As described in Section 5.2.1, Table 5.2-1 regarding the specific reasons for not carrying the local option forward as an alternative in the Draft PEIR, the Town did not find proposed infrastructure corresponding to the local option to be “scalable”. As discussed in the draft PEIR and further elaborated on in the Regional Water Board's analysis included in a letter dated November 4, 2022 and referenced in the Draft PEIR, (https://paradisesewer.com/wpcontent/uploads/2021/04/2020-Central-Valley-Regional-Water-Quality-Control-Board-Alternatives-Analysis.pdf), the options would be to either (1) build small at a lower current cost to accommodate estimated levels of effluent over next 5-10 years and require an upgrade and/or demolish/rebuild of infrastructure at some future cost as the treatment needs increase with population growth in the future, or (2) build facilities to some estimated maximum capacity now at much higher short term costs and only use a small portion of the facilities for the next 10-40 years, depending on realized future population growth. Per the Regional Water Board's findings in their November 4, 2022 letter, the local option would be: "Not easily scalable. (A Paradise) WWTP would be sized for currently-proposed collection system.

Adding additional service area in the future would necessitate expansion of the WWTP and conveyance infrastructure.

Depending on available Rights of Way and treatment/disposal areas, suitable additional areas may not be available.

Further, treatment processes may not be easily scalable without substantial redesign and reconstruction of WWTP elements. Expansion of the WWTP to accommodate larger, future flows would be costly." (https://paradisesewer.com/wp-content/uploads/2021/04/2020-Central-Valley-Regional-Water-Quality-Control-BoardAlternatives-Analysis.pdf) - Depending on the final buildout within the Core Collection System area plus the number of future sewer expansions that may be requested during the Extended Collection System implementation, as well as changes that would be expected to occur in other California communities, the Town would not remain "the largest unsewered community in California" with implementation of the Proposed Project, but could become “the largest community in California with unsewered areas”. As a note, this sentence was used to introduce the Town's post-fire history and was referenced from Butte County Association of Governments documentation (BCAG 2019a); it was not intended to provide "context on the limitations with sewer service only to within the SSA" as stated in the comment. - The information presented in Mr. Ripley's SWRWD Plan and in his comment letter do not manifestly show the alternatives that were assessed in the draft PEIR are unreasonable or that they do not contribute to a range of alternatives which are capable of attaining most of the basic objectives of the project. 8 State-of-the-Art Infrastructure: The same local Paradise Post press report indicated that: [Paradise Mayor Steve] Crowder pointed out that the undergrounding project by Pacific Gas and Electric is also a critical project that will make Paradise “a state-of-the-art community with a brand new
infrastructure.” Beyond underground electrical power
distribution, “state-of-the-art” infrastructure should also include sewer collection, potable water distribution, nonpotable water distribution, independent high pressure supplemental fire supply, fiber optic distribution, and community-scale wildfire defense integrated with the
recently authorized wildfire early warning system. Clearly, all underground utility construction should be coordinated and should precede construction of any new public roads where the utilities are installed. (All references used in text can be found as part of original letter and exhibits [attached]).

Thank you for your input. The Town also considers financing options when pursuing a project. The Town is seeking grant funding for Design, Right of Way and Construction of the sewer project, which is available for septic to sewer conversions, but is not currently available for the alternative utility systems described.

Analysis of timing and funding for utility construction and new roadways is not included in the Draft PEIR for Town sewer service; CEQA documentation requirements for utilities construction and/or new public roads would be determined and carried out when corresponding projects are defined. 1653
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
9 (Appendix B) 1.0 State and Regional Water Board Policies supporting regionalization: Any State Water Resources Control Board (SWRCB) or Regional Water Quality Control Board (RWQCB) policy supporting “regionalization” is an out-of-date policy predicated on “disposal” of wastewater and not beneficial reuse.

RWQCB Central Valley Region #5 (R5) Resolution R5-2009-0028 indicating support for “Regionalization” in the same resolution supports “Reclamation, Recycling, and Conservation.” In the context of the Town of Paradise proposed 18-mile export pipe, the increased discharge of secondary effluent to the Sacramento River runs against California’s long-standing strategy to minimize potable water demand and increase water recycling. The SWRCB encourages water recycling with more recent statewide policies and orders including the 2018 Water Quality Control Plan for Recycled Water and the 2016 General Order for Water
Reclamation Requirements for Recycled Water Use. Further, Governor Newsom this month released California’s Water Supply Strategy which establishes a plan for significant increases in urban water recycling by both coastal and inland communities. The plan targets an increase of 0.8 million acre-feet (MAF) by 2030 and 1.8 MAF by 2040 (see Figure 1 [in App B]). Based on the state’s overwhelming need to reduce potable water demand and
beneficially recycle water wherever feasible, it is the 18-mile export plan that would likely not be supported Governor’s office and would likely not be supported by state and federal funding agencies. (All references used in text can be found as part of original letter and exhibits [attached]).

Please see response to Mr. Ripley's comment #5 to statements regarding the Governor's California's Water Supply Strategy and comment response #6 for discussion of the Regional Water Board's understanding of water recycling and reuse value. In regards to regionalization policies, in a letter dated November 4, 2020 from the Regional Water Board to the Paradise Town Manager cited above and in the Draft PEIR multiple times (https://paradisesewer.com/wp-content/uploads/2021/04/2020-Central-Valley-Regional-WaterQuality-Control-Board-Alternatives-Analysis.pdf), preliminary findings of the Regional Water Board are as follows: "... it is the opinion of the (Regional Water) Board's technical staff that the regionalization option presents an objectively more sustainable long-term solution to the Town's wastewater infrastructure needs.

Due to the apparent overwhelming advantages of the regionalization option, it is the (Regional Water) Board's strong recommendation for the Town to conserve limited financial resources and focus its feasibility analysis on the regionalization option." Further, the Regional Water Board states: "Informing this evaluation is the (Regional Water) Board's decades of experience that local wastewater treatment plants of the type being considered by the Town consistently struggle to comply with applicable regulatory requirements to protect groundwater and surface water." In the Regional Water Board's qualitative analysis attached to their Nov 2020 letter, the Board finds that: "... it is not clear if a sufficient number of users are available, or that a recycled water delivery system (within the Town) would be feasible" and "The City of Chico already provides recycled water for waterfowl habitat uses, and City staff have stated that expanded recycled water use would be desirable and may be pursued in the future. Revenue generated through regionalization with Paradise could make recycled water projects more feasible for Chico." Finally, the Regional Water Board's analysis regarding viability of financial assistance finds that a local alternative is: "Likely to receive less favorable consideration, or outright denial, especially if regionalization has similar or better overall feasibility. May not comply with State and Regional Water Board policies supporting regionalization of wastewater services." (https://paradisesewer.com/wp-content/uploads/2021/04/2020-Central-Valley-Regional-Water-QualityControl-Board-Alternatives-Analysis.pdf). Given the Regional Water Board's negative findings regarding local project feasibility, funding access, and potential for further groundwater and surface water impacts, as well as other reasons captured in Section 5.2.1, Table 5.2-1, the Town eliminated local alternatives from consideration in the Draft PEIR.
10 (Appendix B) In the Town’s case, “regionalization” assumes connection to Chico’s water pollution control plant (WPCP) which discharges secondary effluent to the Sacramento
River. In light of R5’s intent to require Chico to remove nitrogen from its discharge, the draft PEIR should not
overlook the cost and energy intensity required to nitrify and denitrify prior to discharge. As a related example, R5
required Sacramento Regional Sanitation District’s WPCP in Elk Grove to remove nitrogen prior to discharge to the
Sacramento River at a capital cost exceeding $2 billion. Local reuse, conversely, would beneficially utilize nitrogen and other nutrients for agricultural, landscape, and turf
fertilization. (All references used in text can be found as part of original letter and exhibits [attached]).

Regarding the "R5 intent to require" the City to nitrify and denitrify (treated water) prior to discharge, the comment has been considered, and is outside the scope of the PEIR, which is about construction, operation and maintenance of the pipeline; rules for use of it are separate. For response to comments regarding local reuse being considered in the future at the Chico WPCP, please refer to the response to Mr. Ripley's comments #5 and #9. Finally, the intent of an agency cannot be confirmed or disputed by the Town as there is no backup information supporting the statement.
1654
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
11 (Appendix B) 2. Regional Board November 2020 letter
supporting regionalization: The November 2020 R5 letter fails to compare local urban water reuse with river discharge and “recycled water for waterfowl habitat uses”. Nor does the letter consider the multi-benefits of a dual distribution system within the Town that would include 1) non-potable recycled water for landscape, park, turf and agricultural irrigation, 2) seasonal aquifer recharge dispersed throughout the service area, 3) state-of-the-art community-scale wildfire defense, 4) high pressure supplemental water supply for fire suppression, 5) protection against any future
depressurization of PID’s potable distribution system and 6) beneficial use of nutrients inherent in wastewater. Upgrades to the Chico water WPCP for river discharge and/or
agricultural reuse could easily exceed $300 million for nutrient removal and other treatment process
improvements over the next decade. The Town would be
responsible for it’s proportionate share of costs and its contribution would offer zero benefit to Paradise Irrigation District’s (PID)water supply portfolio and zero benefit for the Town’s fire suppression capability. (All references used in text can be found as part of original letter and exhibits [attached]).

This comment has been considered, and is outside the scope of the PEIR. It is not within the Town's jurisdiction to question or explain the Regional Water Board's findings as stated in the November 2020 letter, nor has data resulting from any level of planning/design been publicly released by the Chico WPCP that could be accurately used to estimate costs for upgrades at the Chico WPCP for recycled water or to estimate the financial contribution that the Town could be required to make. The scope of the PEIR is limited to construction of a sewer system and does not include an assessment of the potential for future water recycling at the Chico WPCP.

Although the comment is not relevant to the project, some explanation may be of assistance. Regarding reference to the dual distribution system acting as protection against any future depressurization of PID’s potable distribution system, PID’s 2020 Urban Water Management Plan (2020 UWMP; pidwater.com) described what occurred during the Camp Fire: “Several hours into the duration of the Camp Fire, PID’s pipe network experienced a significant depressurization in a majority of its water mains. A significant number of the 10,480 individual service laterals and/or meters melted and the system partially drained. Though the WTP continued to produce water during the fire, demands from fire sprinklers, firefighting activities, and free-flowing service connections where structures once stood drained significant portions of the system. This depressurization event resulted in negative pressure in many areas throughout the main network..”. Since the same or less costly pipe materials, meters and valves are generally used in constructing purple pipe lines (recycled water) as is used in potable water lines, what occurred in the Camp Fire wouldn’t be stopped by increasing the number of lines, but by upgrades to pipeline materials or other safeguards, as would be determined by Paradise engineering team (pidwater.com) pp. 3-3 and Annex F-27).

Further, the Mitigation Plan attached as part of PID's 2020 UWMP presents Action 9. Backup Portable Generators as a mitigation action based on their risk assessment study. Benefits that would result from funding this action include “The District would not experience a depressurization of distribution system (and would not) lose the ability to treat water for the Town of Paradise…”. As such, PID presents backup portable generators as the solution to mitigate the potential for a long power outage or depressurization during wildfire (pidwater.com, 2020 urban water management plan, Annex F-47).
1655
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
12 (Appendix B) The R5 letter indicates that [the] “Pipeline to Chico can be cost-effectively sized to accommodate a large range of flows.” This indicates that the pipeline can likely accommodate significant wastewater flows over and above the needs of the Town for planned developments within
Chico’s southeast sphere of influence and rural Butte County along the pipeline route. Table 1 presents pipeline capacities for the proposed 10.5 mile 12” export pipe force main based on a range of flow velocities. Table 3 presents the carrying capacity of plastic pipe from an engineering manual which indicates velocities for 12” pipe within the range of 1.3 to

10.12 feet per second (fps). The 7 fps maximum figure
presented in Table 1 is well within the range presented in the engineering manual. At that flow velocity, the export pipe capacity is about 2,400 gallons per minute (gpm), or about 1.7 million gallons per day (MGD) on an average day flow (ADF) basis and 3.4 mgd on a peak hour flow (PHF)
basis. (All references used in text can be found as part of original letter and exhibits [attached]).

The section of the export pipeline referred to in the comment is the Gravity Force Main. As stated in the Draft PEIR (pp. 43-51), “Flow leaving the Transition Chamber would be under pressure based on the gravity flow from the steep Ridge Gravity Section, and the pipe would flow full, creating a beneficial force main based on the hydraulic behavior of the sewer (eliminating the need for a pump station, which is not a part of this system), so the effluent can reach the Chico WPCP. A modulating plug valve would keep the Transition Chamber and Gravity Force Main Sections full, to maintain the hydraulic function of the Gravity Force Main Section." Therefore, the Gravity Force Main was sized based on a differential head criteria, not based on a velocity criteria, such as the 3 to 7 feet per second figures stated in the comment.

The comment appears to relate to a concern about additional connections happening along the export pipeline, between the Town of Paradise and the Chico Water Pollution Control Plant. The engineering work completed by HDR did not include provision for any such additional connections to the Gravity Force Main.

In addition, the Principles of Agreement developed between the Town of Paradise and City of Chico, which are currently being drafted into an Inter-Municipal Agreement to be adopted by the Town Council and City Council, states “The Town and the City agree to prohibit future connections to the export pipeline in the portion of the pipeline that sits outside of the Town limits or City limit.” (www.paradisesewer.com, 1st Draft Principles of Agreement version 7, 21-March-2022). Please also refer to response to L10-6 and other discussions of the Regional Water Board's 2020 study and letter to the Town. 13 (Appendix B) At 1.7 mgd ADF, the lost opportunity for local water recycling in the Town, southeast Chico and rural Butte County could be about 2,000 acre-feet per year (afy) as indicated in Table 2. “Regionalization” as a primary
justification for the 18-mile export project is clearly in conflict with the Governor’s California’s Water Supply
Strategy since it forecloses on a potential 2,000 afy of urban water recycling in the Town and southeast Chico. Based on current drought and wildfire threat conditions, the
Governor’s office would likely strongly support the local reuse alternative over the export alternative. In that same light, the grant funding opportunities for local water reuse would likely be significantly greater than for the 18-mile export based on the Governor’s strong emphasis on urban reuse projects anywhere in the state. (All references used in text can be found as part of original letter and exhibits [attached]).

Please see responses to Mr. Ripley's comments #5 and #9. Anticipating what level of support would be imparted by the Governor's office would be speculative and does not speak to the Draft PEIR's adequacy or accuracy; therefore, this comment has been considered, but does not require specific response. However, it is anticipated that the Governor may give some deference to the findings of the Regional Water Board. 1656
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
14 (Appendix B) The R5 letter fails to acknowledge that Butte LAFCo cannot approve an 18-mile extension of sewer service absent an existing or impending public health and safety threat. The 0.1 mgd post-fire subsurface dispersal in the sewer service area (SSA) that had a pre-fire permitted
subsurface dispersal capacity of about 0.5 mgd cannot be considered an existing or impending health threat. Absent such a threat, Butte LAFCo cannot approve the extension as it is the only legally permissible justification available to LAFCo to approve a service extension request outside of an agency’s (Chico) Sphere of Influence. The only path forward with the extension request therefore would likely be a
waiver approved by the state legislature and the Governor, similar procedurally to Assembly Bill 36 (Gallagher, 2021). (All references used in text can be found as part of original letter and exhibits [attached]).

Please see response to Mr. Ripley's comment #6 above. Further, it is not within the Town or commenters' jurisdiction to interpret regulatory guidance or make a determination regarding what Butte LAFCo can or will approve, and, more immediately, is outside the scope of this Draft PEIR. LAFCo staff are uniquely qualified and appointed to make such determinations based on regulatory guidance and experience and the agency has its own process for public review and appeals.
15 (Appendix B) The R5 November 2020 letter did not confirm the presence of an existing or impending public health and safety threat in Paradise of which it has the technical and regulatory authority to determine. Even if R5 made such a determination, the proposed export project serving only 14% of the Town would not alleviate most of the threat since there is ample high density residential, commercial, health careand institutional development outside of the proposed SSA which could also have subsurface dispersal issues.

Absent an existing or impending health and safety threat, the 18-mile export project as indicated above is legally impermissible. In its alternative analysis of the
regionalization versus local reuse options available to the Town, R5 erred in not considering Government Code
restrictions on any extension of utility service from one jurisdiction to another in California. (All references used in text can be found as part of original letter and exhibits [attached]).

Please see responses to Mr. Ripley's coments #11 (Town's lack of jurisdiction/expertise to explain findings of Regional Water Board), and #'s 6 and 14 (LAFCo Government Code restrictions). Further, the 2020 Regional Water Board letter was not required to discuss a public health and safety threat, as they had already declared it as such in their In a letter dated May 4, 1992; at that time the RWQCB approved the Town’s plans to establish an “Onsite Wastewater Management Zone” to address public health and environmental concerns noted in previous studies (RWQCB 1992). The 2020 letter was intended, as titled, to present an Evaluation of Wastewater Treatment Plant Options (https://paradisesewer.com/wp-content/uploads/2021/04/2020- Central-Valley-Regional-Water-Quality-Control-Board-Alternatives-Analysis.pdf). Please also refer to comment response L10-14. Further, Chico City Code Section 15.40.285, Regulation of Waste Received from Other Jurisdictions , requires that any project with another municipality which would utilize the Chico sanitary sewer system requires an intermunicipal agreement (IMA) and sets out the requirements for such agreement; therefore, the Town is following existing regulatory guidance. 1657
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
16 (Appendix B) 3. Siting local wastewater facility within residential and business areas: Figure 2 presents an image of a California Title 22 water reclamation facility sited in a residential setting in southern California. This facility was permitted by R8 (Santa Ana Region) under Title 22 criteria and had operated continuously between 1981 and 2006
when the facility was decommissioned with the arrival of an Inland Empire Utilities Agency (IEUA) purple pipe extension to two adjoining golf courses. During its 25-year operation, this author was not aware of a single odor or noise
complaint from residents adjacent to the facility. This image was included in the Water Reuse textbook as an example of a satellite treatment plant located in a housing
development. Figure 3 presents a 2021 satellite image of the decommissioned facility indicating its close proximity to numerous residences and a swimming pool. (All references used in text can be found as part of original letter and exhibits [attached]).

Although the comment is not relevant to the project, some explanation may be of assistance. In review of the text accompanying the figure in this case study (Tchobanoglous, G., et al, Water Reuse, Technologies, and Applications, McGraw Hill, 2007, Figure 12-17), as introduced by the commenter, some points require clarification. The author of the textbook does state "The plant... is provided with odor control facilities. The design features have proved that a wastewater facility can be constructed and operated in a residential-type setting without nuisance" (p.760). However, there is no information on noise or odor complaints received and no description provided to understand the criteria used to determine "without nuisance" or to understand what the author's thresholds were. The project "was initially conceived and built by a developer who needed a golf course to improve marketability and value of the residential property", was used solely for the Upland Hills Country Club (p.760) golf course irrigation, and payment was made by the golf course for the recycled water. The author found that "Because the influent wastewater is of domestic origin and the influent has a TDS of about 485 mg/L, the effluent is well-suited for golf course irrigation (p.761). Treatment of the wastewater, as described in the case study, was limited as compared to another case study in the same textbook for the Solaire Building in New York constructed around 2005 (751). Reclaimed water at the NY facility was limited in use to only toilet flushing and cooling tower makeup, and later added irrigation at an adjacent park. However, the NY system also required ozone oxidation, ultraviolet disinfection, and ultrafiltration membrane units, injection of potable water, and later, for irrigation, the addition of a reverse osmosis system - all absent from the process flow description for the golf course facility as described in the textbook, possibly due to changing water quality requirements for reclaimed water over time or variances in state/regional regulatory requirements. Therefore, noise and odor effects could be very different if the golf course facility were required to add those additional treatment systems. Further, the facility was decommissioned because "... the facilities are in need of upgrading to preserve their integrity. Lack of adequate local financing for improvements is an obstacle in implementing necessary upgrades. ... unfunded replacement reserves would have facilitated needed rehabilitation and upgrades to ensure continued operations without full system replacement" (p.761). Therefore, the decision was to decommission the failing local facility and connect to the Inland Empire Utilities Agency facilities (as described in commenter's discussion).
17 (Appendix B) 4. Lack of sufficient recycled water users in area Table 3 indicates PID’s pre-fire estimate of total water demand in 2040 of 7,817 afy. This compares with 3,576 afy of PID’s pre-fire estimate of 2040 wastewater dispersal as indicated in Table 4. These two values indicate that, on an annual basis, the total service area pre-fire potable and raw water demand is roughly 2.2 times the wastewater
generation. On a seasonal basis, the non-potable exterior irrigation demand could be as high as 4 times the interior potable demand on peak summer days. Clearly, with dual
distribution to all served parcels, the annual average nonpotable demand exceeds the potential recycled water supply. (All references used in text can be found as part of original letter and exhibits [attached]).

PID updated their Urban Water Management Plan (UWMP) in 2021, which reports much lower estimates of demand over a 20 year horizon (2025 - 2045; published in June 2021 and available at:
https://pidwater.com/docs/about-your-water/water-supply/2001-pid-2020-urban-water-managementplan/file). Given there is no water reuse in the Town at this time, the calculations include all water needs for the community. In this document, PID reports: "There is no known deficit of supply in the planning horizon of this UWMP, even considering the likely impacts of climate change in that time period with increasing temperature, reduction in rainfall, and declining snowpack." (PID UWMP 2021, Section 6.13, p.6-12) In the same document, DWR Tables 7-2, 7-3, and 7-4 (pp. 7-6 to 7-7) compare PID supply with Town estimated demand 2025-2045. These calculations look at a normal year (7-2), a single dry year (7-3), and up to five years of consecutive drought conditions (7-4). Even with up to five years of consecutive drought conditions, 2025- 2045, PID shows a minimum estimated 1,312 acre-foot overage. PID states: "It is important to note that in all scenarios shown in these tables, Normal Year demands are shown, without the expected conservation percentages ranging from 10-50% that would be expected in drought conditions. By comparing reduced supply volumes in dry years to Normal Year demand levels, it is shown conservatively that PID is able to successfully meet demand in all year types." (p. 7-6). The 2015 UWMP appears to no longer be available at the PID website noted above; further, there are no estimates for "wastewater dispersal" in PIDs 2022 document; therefore, the quoted wastewater numbers in this comment can not be verified or discussed. 1658
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
18 (Appendix B) 5. Large effluent storage facility needed for winter flows: Based on information provided by Town
engineers, the heat of the Camp Fire at the ground surface did damage some septic tanks, particularly those
constructed of plastic or fiberglass. However, of the 11,000+ leachfields there has been no reported damage. With that context, the Sewer, Water Reuse, and Wildfire Defense
(SWRWD) Plan proposes to utilize the existing 11,000+
leachfields for shallow aquifer recharge in the winter months eliminating the need for a seasonal effluent storage facility.

The dual distribution will be in place, and individual
irrigation controllers will be used to control and meter delivery of tertiary effluent to existing leachfields in the winter months as/when needed. Ultimately, the pre-fire
2040 estimate 3,576 afy dispersal of septic tank effluent would be reduced to about 980 afy dispersal of tertiary effluent meeting strict Title 22 unrestricted irrigation standards. These values assume the long-term objective of the SWRWD Plan to serve most if not all of PID’s 10,600 service connections and not just the 1,500 connections in the proposed SSA. (All references used in text can be found as part of original letter and exhibits [attached]).

As stated in Comment Response 17, based on PID's Urban Water Management Plan (UWMP) (2025 - 2045; published in June 2021 and available at: https://pidwater.com/docs/about-your-water/water-supply/2001- pid-2020-urban-water-management-plan/file) the 2022 UWMP (PID 2021 - reference in Comment Response 17), there is no projected shortage of water.
19 (Appendix B) 6. Land for storage environmentally sensitive:

Land for seasonal storage unnecessary. See response #5
above. (All references used in text can be found as part of original letter and exhibits [attached]).

Please see response to comment #L10-4 above regarding the elimination of the local option as an alternative in the Draft PEIR.
1659
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
20 (Appendix B) 7. Local WWTP construction would be a lengthy process: The 2016 General Order for Water Reclamation
Requirements for Recycled Water Use provides an expedited path for recycle permits, since most non-potable recycled water projects rely on the same regulatory framework
provided in Title 22. With low-pressure effluent collection and temporary treatment facilities at say, the abandoned Lava Creek golf course, time to first-flush would likely be less than 18 months, perhaps as little as 12 months from
authorization to proceed. This compares with estimates of the gravity collection and 18-mile export project taking as much as a decade to first-flush. There is ample precedent in R5 for satellite water reuse facilities permitted under Title 22 criteria for disinfected tertiary recycled water. In
combination with the 2016 General Order, the R5 approval process could be concurrent with the facility design thereby expediting the project delivery schedule. (All references used in text can be found as part of original letter and exhibits [attached]).

The project as proposed will be operational by Summer 2026, as shown in the schedule on paradisesewer.com.
21 (Appendix B) 8. Auxiliary water system would for fire suppression would be a separate pipeline system: Yes, a separate pipeline system would be required modeled after El Dorado Irrigation District’s dual distribution system (in operation for over four decades) and San Francisco’s
auxiliary water supply system (in operation for over a
century). In addition, the dual distribution provides access to individual leachfields for winter subsurface dispersal and would provide assurance that, in the event of a repeat of an extreme wildfire event, that PID’s potable system would be protected from depressurization caused by the abrupt
increased demand from residential sprinklers and firefighting activity. (All references used in text can be found as part of original letter and exhibits [attached]).

Thank you for your comments. They are outside the scope of the project and fire suppression is not one of the identified objectives of this project.
1660
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
22 (Appendix B) 9. Inefficient oversizing of treatment facility in early years: Inefficient oversizing of infrastructure is not unique to wastewater treatment facilities – it is a given on any infrastructure project – water import and treatment facilities, power generation and transmission, highways, airports, rail facilities, ports, etc. etc. Utilization is never near optimum in the early years, and full utilization may come decades after construction is complete. For context, how efficient is a $184 million export project when the initial flow estimate is only about 0.1 mgd serving a 2026
connected population of 1,391? Since the $184 million
figure is only a Class 5 estimate (- 30% to +50%) coupled with the recent inflation spike, the actual construction bid cost could easily exceed $300 million – with no possible
opportunity for interim temporary facilities or phasing.

Where’s the early year efficiency in that? (All references used in text can be found as part of original letter and exhibits [attached]).

The pipeline has been sized to accomodate the flow from the Core Collection and Extended Collection system, as well as the Treatment Plant capacity, within the 30-year planning horizon as laid out in the Town of Paradise 2022 General Plan Housing Element Update (Section 2.5.1.1 of the Draft PEIR). Further, Chico City Code Section 15.40.285, Regulation of Waste Received from Other Jurisdictions , requires that any project with another municipality which would utilize the Chico sanitary sewer system requires an intermunicipal agreement (IMA) and sets out the requirements for such agreement. Estimates regarding "actual construction bid costs" would be speculative at this level of design. 23 (Appendix B) 10. O&M for a full-scale treatment facility would be supported by a small initial ratepayer base: Figure 4 presents a satellite water reclamation facility owned and operated by Fresno County Special Districts, County Service Area #34. This facility was permitted by R5 under Title 22 criteria in 2005. Table 6 presents the 2022-2023 projected operating budget for operation and maintenance (O&M) of this facility. Compare that Fresno County CSA #34 O&M
value with estimates for the export project O&M:
$254,000/yr for the regional pipeline, $1,022,000 for the gravity collection system, and the $491,000 contribution to Chico WPCP O&M. These annual costs total $1,767,000/year starting at first-flush. How can the Town afford this when most of the SSA parcels are currently vacant? Add to this annual O&M cost the annual cost of the local share of loan debt repayment since it is unlikely that the project will achieve 100% grant funding for capital costs. If interior residential water use is reduced to 42 gallons per person per day (gpcd) by 2040 in accordance with recommendations by the California Department of Water Resources, the Town
connected population served by a similar Title 22 facility (CSA #34 plant) could potentially be about 4,700, equal to the estimated population in the SSA at Year 2050. (All
references used in text can be found as part of original letter and exhibits [attached]).

The local treatment alternative does not meet the goals of the project as set out in Section 2.3.2, Project Goals and Objectives. Further, as explained above, the Town has secured grant funding for the development of the preliminary engineering and preparation of the environmental documentation. We are also working to secure grant funding for the design, right-of-way, and construction stages of the project. The Town is aware of the cost estimates associated with design, construction, and operation of the sewer project, as is estimated at this early point in design. As noted in previous and subsequent comment responses, this comment does not speak to the physical environmental assessment of potential impacts that could result from proposed project implementation and speaks to potential costs, which is outside of the scope of the PEIR.
1661
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
24 (Appendix B) 11. Treatment processes not easily scalable:

The export plan has zero potential for phasing and cannot be scaled up ever once capacity is reached in the collected area of the SSA. The local treatment collection system and local water reuse plant, however, can be scaled up to ultimately serve all 10,600 connections and be designed to operate efficiently even at low initial flows. (All references used in text can be found as part of original letter and exhibits [attached]).

Please see Comment Response #L10-7 regarding scalability. 25 (Appendix B) 12. Extensive ongoing monitoring required for local recycling: Table #6 does not call out monitoring costs since Fresno County operators conduct in-house lab tests as part of their normal daily and weekly routines. Monitoring costs are included in the “Professional and Specialized Services” line item. Monitoring reports are submitted by the operators to R5 on a quarterly and annual basis. All
operators are state-certified and are employees of Fresno County.

Thank you for the information. The PEIR is to analyze the proposed Town sewer pipeline construction, operation and maintenance and does not include a discussion of costs.

Richard L. Harriman August 30, 2022 L11 1
Thank you for granting my request for a one-day extension of time within which to submit the following Comments
regarding the Draft Program EIR (DPEIR) for the
above-referenced Project. I am submitting the following comments regarding the above-referenced proposed project on behalf of myself, as a resident of the City of Chico and the County of Butte, a taxpayer and rate payer of the City of Chico and the County of Bulle, and as a member of the Butte Environmental Council and in the public interest of other residents of the City of Chico and the County of Butte.

Thank you for your input.
2 1. I join in the Comments submitted, by the Butte County Local Agency Formation Commission and the County of
Butte, regarding the DPEIR.

Thank you for your input. We appreciate all viewpoints expressed by our community members. 3 2. I also join in the Comments submitted by Dana Ripley, regarding the DPEIR. Thank you for your input.
1662
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
4 3. I am requesting that the Final PETR include a copy of my letter comments, dated June 3, 2021, regarding the Notice of Preparation which were submitted on that date and that
they be included in the Response to Comments on the DPEIR for the proposed sewer line project, including the article that I prepared which analyzes the public policy, legal, and environmental benefits to be gained by reconsidering the "Preferred Project." The issues raised in my letter of June 3, 2021 have not been addressed, analyzed, or considered in the DPEIR and that they be analyzed and considered in the "Project Alternatives" section of the EIR prepared for the proposed project.

As requested, the June 3, 2021 letter with attachments has been appended to the (this) current comment letter from Mr. Harriman (#L11) and issues raised are addressed here. Since Mr. Ripley’s SWRWD Plan and comments appear to be consistent with Mr.

Harriman’s June 3, 2021 letter and current comments, some issues have already been responded to and therefore, references to Mr.

Ripley’s L10 comment letter (comments 1 – 25) are provided, as appropriate.

Issue 1. Response: Your agreement with LAFCo NOP comment letter dated May 20, 2021 is noted and the referenced LAFCo letter is attached to June 3 letter as part of this response to comments appendix; Issue 2. Response: Thank you for providing your “Urban Water Conservation: Another Alternative” opinion paper. Similar to the SWRWD Plan, calculations and opinions are included that the Town is not required to provide responses to as there is no substantiation or factual documentation to consider. Further, comments on costs and financing options are outside the scope of the PEIR. Any remaining points described in the your paper are similar to, and in some cases identical to, the SWRWD plan and are responded to in responses to Mr. Ripley’s letter (#L10, 1 to 25).

Issue 3. Assessment of environmental, planning, and economic impacts corresponding to updates to the General Plan would be speculative and are outside the scope of this sewer project PEIR – as noted by Mr. Harriman, both the Town and City have separate CEQA documentation to analyze effects that may result from future updates to both communities’ General Plans.

Issue 4. Given that the Proposed Project Description has evolved and been updated between the commenters letter date of June 3, 2021 and the posting of the Draft PEIR for public review on July 14, 2022, this issue has been resolved. There were no comments received on the Draft PEIR from Mr. Harriman or any other commenters on the Draft PEIR that contested the completeness or accuracy of the description of the Proposed Project. Further, this comment again focuses on opinion regarding the rationale for project, but does not reference facts to support the opinion; therefore, the Town is not required to respond.

Issue 5. As you request in comment, the PEIR does “disclose, analyze, discuss and address the potential significant impacts to the environment which may occur”. However, the EIR cannot address possible future changes to the final project, as they are unknown and would be speculative; however, as required by CEQA (Section 15162 (a) and (a)(1)), “When an EIR has been certified… for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines… (that) substantial changes are proposed in the project which will require major revisions of the previous EIR… due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects”, the Town would be required to complete additional CEQA analysis if either of the conditions referenced above were to result from changes to the final project.

Section 5.2 of the PEIR describes why the Town has eliminated the “local option” from consideration as a feasible alternative; therefore, there is no discussion of the issues presented in the letter within the “Project Alternatives” section of the PEIR, rather all are addressed here. Please also see responses to Ripley’s letter – L10, Responses #4 and #11 regarding alternatives. 1663
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
5 4. The benefits for prevention of significant adverse environmental effects from recurrent wildfires on the Ridge that could be provided by the alternative recommended by Dana Ripley in his comments regarding the true "Preferred Alternative" were not considered in the previous Study
relied upon in the DPEIR. The previous Study and Analysis needs to be updated in light of advantages of the locally owned and controlled specially engineered Treatment
Facility on the Ridge. The reason for this request is that the previous analysis relied upon in the DPEIR was prepared before lhe Paradise Camp Fire and needs to be updated, due to the elevated risk of recurrent wildfire, which can be mitigated by the re-use of treated effluent to irrigate and enhance the defensive open space needed to protect new
urban development in the Town of Paradise and in the
County of Butte.

Regarding existing wildfire risk, the PEIR evaluated the proposed project in light of this resource and, with mitigation incorporated (Section 3.18.4, Table 3.19-1), the Town’s analysis found that implementation of the proposed project did not result in “significant adverse environmental effects” on Wildfire, a finding that was not disputed by Mr. Harriman in this comment letter. Development of solutions to current wildfire conditions would be a separate project and is not within the scope of this PEIR.

As relates to the reference to Mr. Ripley’s comment, Mr. Ripley’s “preferred alternative” (as defined by Mr.

Ripley and not related to the Town's CEQA analysis) was considered but eliminated from consideration as an alternative as described in the Town’s response to Mr. Ripley’s comment #L10-4. In addition, this is the first mention of the “Treatment Facility on the Ridge”, which has not been described or otherwise mentioned in comments received on Draft PEIR; the only reference to “the Ridge” was found in a letter Mr. Harriman distributed at a meeting with the Town and Town attorney, that he had written to the Chico EnterpriseRecord on June 4, 2021 (Letter is provided as an attachment to Mr. Harriman's comment letter following the June 3, 2021 letter discussed in L11-4 above). In this letter to the press, “the Ridge” is described as being part of unincorporated (Butte) County, not within the Town boundaries. The Town would not have jurisdiction to propose facilities outside of the Town boundaries; therefore this is outside of the scope of this Paradise sewer project PEIR. Finally, regarding the request for additional studies and analysis, ParadiseSewer.com provides links to all of the studies considered in developing the Proposed Project (under the “Project Materials” tab); the list does include pre-wildfire studies, but they are matched in number by those completed since 2020, post-fire.

Further, please refer to Comment Response #L10-4 regarding the requirements to analyze an alternative under CEQA.
6 5. Although I have made this comment at public meetings regarding the proposed project, it should be noted that the DPEIR does not address, analyze, or consider the
environmental, planning, and economic impacts of not
requiring lhe preparation of the updated General Plans and Environmental Impact Reports for Town of Paradise and the City of Chico as part of the "Preferred Project" analysis, although the Butte County LAFCo has been requesting the Town of Paradise to do so, since 1985. The DEIR should
require a Condition to require such updates to be prepared and approved, prior to the commencement of construction of the proposed project or as a condition of approval by LAFCo.

As stated in multiple Sections of the Draft PEIR, including Sections 2.2.1, 2.2.2, and 2.3.1, the Proposed Project is consistent with the goals of the 1994 Town of Paradise General Plan and accounts for growth consistent with the recently updated Town of Paradise 2022 Housing Element. Further, a resolution (#13-04, included in Appendix B of the PEIR) was adopted by the Paradise Planning Commission in 2013 finding the "1994 Paradise General Plan substantially complies with the statutory mandates under Government Code Section 65302" (Appendix B). Please also review response to L11-4 above, which discusses environmental review of updates to general plans.
1664
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
7 6. The Project Description is not stable, finite, and accurate.

Draft Program EIR should be revised, amended, corrected, and re-circulated and the public comment period be reopened and new public Scoping Meetings held by the lead agencies, including both the City of Chico and the Town of Paradise. The reason for require the requested action is that because the
purported rationale for the proposed project [expedited redevelopment of the Town of Paradise] will not be achieved by the development and construction of the proposed
project, as defined. In fact, the construction of the Project Alternative advocated by Civil Engineer Dana Ripley could be expedited and achieved much more rapidly than the
construction of the "Preferred Alternative" recommended for adoption in the DPEIR.

The project as proposed fulfills the Project Goals and objectives stated in Section 2.3.2 of the Draft PEIR.

Please also review response to L11-4 above, which discusses sufficiency of the project description. 8 7. The DPEIR fails to disclose, analyze, discuss and address the potential significant impacts to the environment which may occur, depending on what changes arc made to the
"Final Project" pursuant to the "Design Build" legislation adopted in AB 36 (Gallagher). The adoption of AB 36 by the State Legislature has rendered the DPEIR's analyses legally inadequate, because the proposed Preferred Alternative
may bear little or no resemblance to tbe proposed Preferred Project Alternative, due to currently unknown changes made to the final design prior to and/or during construction of the project. Further, due to the preparation of a Draft "Program" EIR, the actual project may be significantly changed during construction by circumventing the project description in the Final PEIR tluough the use of multiple Project Addendums that do not require notice to the public or public review during the course ol' construction of the Final Project design, whatever it may be.

Please see response to L11-4 above, which discusses future project plan updates. Further, County of Inyo, supra, 71 Cal.App.3d at p.199 as referenced in South of Market v City and Co of San Francisco, supra, 33 Cal.App5th 321 at p.8, concludes that "the CEQA reporting process is not designed to freeze the ultimate proposal in the precise mode of the initial project; indeed, new and unforeseen insights may emerge during investigation, evoking revision of the original proposal". The Town recognizes that "Project Addendums" are not required to be noticed to the public; however, CEQA Addendums are also only allowed "if some changes or additions are necessary but none of the conditions (described in CEQA Section 15162 (a), which is quoted in L11-4, Comment 5 above)..." that would call for preparation of a subsequent EIR (new significant effects or substantially increased effects and others listed in Section 15162), would occur. Therefore, if updates to the Proposed Project did occur in the future, the Town would consider what level of additional CEQA analysis, if any, was appropriate based on the potential for new or increased physical effects on the environment or other conditions occur described in Section 15162. Further, Chico City Code Section 15.40.285, Regulation of Waste Received from Other Jurisdictions , requires that any project with another municipality which would utilize the Chico sanitary sewer system requires an intermunicipal agreement (IMA) and sets out the requirements for such agreement; therefore, regulatory requirements already in place are being adhered to. 1665
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
9 8. However, the most egregious legal inadequacy of the DPEIR is that it is barely readable and understandable, due to the lack of a Table of Contents and inadequate
organization and disclosure of the Comments made during the Notice of Preparation process. The DPEIR glosses over the numerous comments and objections that were made in
the Notice of Preparation process. Specifically, without having the Town General Plan updated since 1980, the
changes in density requirements and other legislation that has been adopted by the State Legislature to provide for more dense residential dwelling units and reduction of
Green House Gasses are barely even mentioned in the
DPEIR, which results in accelerated "urban sprawl" within the Town's Sphere of Influence. Instead of focusing on dense multi-story and affordable multi--family housing in the Town's previously developed urban footprint, the "Preferred Alterative" supports and incentivizes accelerated inefficient sprawl in the Town and into the County's Jurisdiction.

The Draft PEIR document begins with a Table of Contents. All comments received during the NOP public comment window are included with the DPEIR in Appendix A: NOP Scoping Report, organized into a Comment Matrix, as well as Town responses. All comments received in response to release of the Draft PEIR have been reviewed and considered in the process of creating the Final PEIR, in addition to comments received from Mr. Harriman outside of both public comment periods (see response to Comment L11-4).

The version of the The Town of Paradise General Plan used in the development of the Draft PEIR, drafted in 1994, rather than 1980, includes amendments through 2008, and the Town of Paradise Housing Element referenced in the Draft PEIR was updated in 2022 (see response to L11-6 and PEIR, Appendix B).

Density (multi-family housing or vertical construction) becomes more feasible with a sewer system, and is one of the benefits of the sewer project. Please see Comment Response #W17-6 regarding growth outside of the Town of Paradise. Regarding the Draft PEIR focus on affordable housing, as stated in 2.3.2 Project Objectives and Goals, providing economic recovery and construction of affordable housing are integral to the Proposed Project, being identified as the primary objectives and goals of the project to meet the needs of the community (Section 2.3.1).
10 9. Finally, the DPEIR's failure to adequately disclose, analyze, discuss, consider, and compare and contrast the expense of the Preferred Alternative to the more efficient and
expandable specially engineered waste treatment facilities discussed in great length in the Comments submitted by
Dana Ripley in his Comments and "White Paper"
demonstrates the legal inadequacy of the DPEIR and the
failure to proceed in the manner required by law, pursuant to Public Resources Code sections 21 168 and 21 168.5.

Please see Comment Response #L10-4 and #L11-5 regarding the requirements to analyze an alternative under CEQA. CEQA Guidelines Section 15064 describes how to determine significance of effects. Section 15064 (d) states that a Lead Agency should "consider direct physical changes in the environment which may be caused by the project" and defines a "direct physical change" as "a physical change in the environment which is caused by..." the project (Section 15064 (d)(1)). CEQA Guidelines Section 15124, defining what must be include in a project description, does not state that cost of a project is required. Often estimated costs at the early levels of design, such as here, carry huge contingencies as there isn't sufficient detail to make a refined cost estimate. What is required in the CEQA Project Description is "A general description of the project's technical, economic, and environmental characteristics" (Section 15124 (c)). As noted in previous response, economic recovery of the community is integral to the Proposed Project and a primary objective (Section 2.3.1).
1666
Commenter/Agency Comment Date Letter No. Comment No. Comment Text Comment Response Paradise Sewer Project PEIR Comment Matrix
11 Please include this letter and Comments in the Record of Proceedings and include all of the Comments made
regarding the Notice of Preparation previously relied upon by the public to review this very expensive and unnecessary public project in a Revised and Amended Draft ElR for the Preferred Project, instead of Program EIR for this vague, inadequately described, and expensive "Preferred Project".

In addition, please remand the review of this proposed
project back to the Public Works Department Staff for the preparation of an updated Project Review and Analysis,
based on current water resource conditions and Wildland Urban Interface (WUI) environmental setting and
background on the Town of Paradise, in the light of the Governor's Water Resiliency Portfolio and recently adopted Water Policy focusing on more efficient use of our water and energy resources. Finally, the Town of Paradise should be required to conduct the updated Study while
contemporaneously updating the Town's GeneraI Plan.

Given that most of this is strictly opinion and how the Town will proceed is under jurisdiction of the Town administration, there is no response required for most of statements included in this comment. All comment letters received during the NOP public review period (July 14 through August 29, 2021) are contained and responded to in the Scoping Report that was/is attached to the PEIR (Appendix A). Comments received separately from Mr. Harriman outside of a formal public review period (June 3, 2021), have been included as attachments to this letter addressing comments on the Draft PEIR (#L11) and are responded to above in response to comment #L11-4.
12 Thank you for the opportunity lo comment on the DPElR.

Please put me on your circulation list for the this Draft EIR and/or any changes in the process, including recirculation of a revised or amended NOP, Project Description, and/or
revised or amended Draft EIR for this amorphous project.

We will continue to include you in the circulation list for any further documentation on the project, as was done on previous phases of this process (see attached email dated July 14, 2022 titled Paradise Sewer Project Draft PEIR is Available! ).

Dannette Barefield August 30, 2022 W39 1 I support the pier project Thank you for your input. We appreciate all viewpoints expressed by our community members.

Patty Wilson August 30, 2022 W40 1
I only wanted to know how the sewer was going down the
hill. After repaving the skyway, I would hope you would not have to dig it back up. I can not see where the town plans on digging.

Thank you for your comment. Section 2.5.2.1 outlines how the sewer flows travel the Export Pipeline System, including the Ridge Gravity Section for downhill flows and the Gravity Force Main Section for uphill flows. Any digging will take place in the public right-of-way. Much of Skyway falls under County jurisdiction, and is outside of the jurisdiction of the Town.
1667
Marc Mattox
Town of Paradise
5555 Skyway
Paradise, CA 95969
Dear Mr. Mattox:

ENVIRONMENTAL IMPACT REPORT (EIR) FOR TOWN OF PARADISE (TOWN); PARADISE SEWER PROJECT (PROJECT); BUTTE COUNTY; STATE
CLEARINGHOUSE NO. 2021050008
We understand that the Town is pursuing Clean Water State Revolving Fund (CWSRF) financing for this Project (CWSRF No. C-06-8568-210). As a funding agency and a state agency with jurisdiction by law to preserve, enhance, and restore the quality of California’s water resources, the State Water Resources Control Board (State Water Board) is providing the following information on the EIR to be prepared for the Project.

The State Water Board, Division of Financial Assistance, is responsible for administering the CWSRF Program (Program). The primary purpose for the Program is to implement the Clean Water Act and various state laws by providing financial assistance for wastewater treatment facilities necessary to prevent water pollution, recycle water, correct nonpoint source and storm drainage pollution problems, provide for estuary enhancement, and thereby protect and promote health, safety and welfare of the inhabitants of the state.

The Program is partially funded by the United States Environmental Protection Agency (USEPA) and requires additional “California Environmental Quality Act (CEQA)-Plus” environmental documentation and review. Two enclosures are included that illustrate the Program’s environmental review process including the additional CEQA-Plus federal requirements. For the complete environmental application package and instructions please visit:
http://www.waterboards.ca.gov/water_issues/programs/grants_loans/srf/srf_forms.shtml . The State Water Board is required to consult directly with agencies responsible for implementing federal environmental laws and regulations. Any environmental issues raised by the federal agencies or their representatives will need to be resolved prior to the State Water Board’s approval of a CWSRF financing commitment for the proposed Project. For further information on the Program, please contact Mr. Brian Cary, at (916) 449-5624.

L1
1668
Mr. Mattox - 2 - July 27, 2022
It is important to note that prior to a CWSRF financing commitment, projects subject to provisions of the Federal Endangered Species Act (ESA), must obtain ESA, Section 7 clearance from the United States Department of the Interior, Fish and Wildlife Service (USFWS), and/or the United States Department of Commerce National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NMFS) specific to any potential effects to special-status species.

Please be advised that the State Water Board will coordinate with the USEPA to consult with the USFWS, and/or the NMFS regarding all federal special-status species that the Project has the potential to affect if the Project is to be financed by the Program. The Town will need to identify whether the Project will involve any direct effects from construction activities, or indirect effects such as growth inducement, that may affect federally listed threatened, endangered, or candidate species that are known, or have a potential to occur in the Project site, in the surrounding areas, or in the service area, and to identify applicable conservation measures to reduce such effects.

In addition, CWSRF projects must comply with federal laws pertaining to cultural resources, specifically Section 106 of the National Historic Preservation Act (Section 106). The State Water Board is responsible for ensuring compliance with Section 106 and is required to consult directly with the California State Historic Preservation Officer (SHPO). The SHPO consultation is initiated once sufficient information is provided by the CWSRF applicant
(https://www.waterboards.ca.gov/water_issues/programs/grants_loans/docs/cultural_res ources_report_prep.pdf). If the Town decides to pursue CWSRF financing, please retain a consultant that meets the Secretary of the Interior’s Professional Qualifications Standards (http://www.nps.gov/history/local-law/arch_stnds_9.htm) to prepare a Section 106 compliance report.

Note that the Town will need to identify the Area of Potential Effects (APE), including construction and staging areas, and the depth of any excavation. The APE is threedimensional and includes all areas that may be affected by the Project. The APE includes the surface area and extends below ground to the depth of any Project excavations. The records search request should extend to a ½-mile beyond project APE. The appropriate area varies for different projects but should be drawn large enough to provide information on what types of sites may exist in the vicinity.

Other federal environmental requirements pertinent to the Project under the Program include the following (for a complete list of all federal requirements and instructions please visit
http://www.waterboards.ca.gov/water_issues/programs/grants_loans/srf/srf_forms.shtml :

A. An alternative analysis discussing environmental impacts of the Project. The alternative analysis must include:
1669
Mr. Mattox - 3 - July 27, 2022
• A “no project/no action” alternative.
• Comparative analysis among the alternatives that includes discussions of beneficial and adverse impacts on the existing environmental, future environmental, and individual sensitive environmental issues associated with the project.
• Analysis of direct, indirect, and cumulative impacts on sensitive environmental resources, if applicable.
• Appropriate mitigation measures to mitigate adverse impacts, if appropriate.
• Thorough discussion of the rationale for selection of the chosen alternative for the project.

B. A public hearing or meeting for certification of the EIR.

C. Compliance with the Federal Clean Air Act: (a) Provide air quality studies that may have been done for the Project; and (b) if the Project is in a nonattainment area or attainment area subject to a maintenance plan; (i) provide a summary of the estimated emissions (in tons per year) that are expected from both the construction and operation of the Project for each federal criteria pollutant in a nonattainment or maintenance area, and indicate if the nonattainment designation is moderate, serious, or severe (if applicable); (ii) if emissions are above the federal de minimis levels, but the Project is sized to meet only the needs of current population projections that are used in the approved State Implementation Plan for air quality, quantitatively indicate how the proposed capacity increase was calculated using population projections.

D. Compliance with the Coastal Zone Management Act: Identify whether or not the Project is within a coastal zone and the status of any coordination with the California Coastal Commission.

E. Protection of Wetlands: Identify any portion of the proposed Project area that should be evaluated for wetlands or United States waters delineation by the United States Army Corps of Engineers (USACE), or requires a permit from the USACE, and identify the status of coordination with the USACE.

F. Compliance with the Farmland Protection Policy Act: Identify whether or not the Project will result in the conversion of farmland. Identify the status of farmland (prime, unique, local or statewide Importance) in the Project area and determine if this area is under a Williamson Act Contract.

G. Compliance with the Migratory Bird Treaty Act: List any birds protected under this act that may be impacted by the Project and identify conservation measures to minimize impacts.

H. Compliance with the Flood Plain Management Act: Identify whether or not the Project is in a Flood Management Zone and include a copy of the Federal Emergency Management Agency flood zone maps for the area. 1670
Mr. Mattox - 4 - July 27, 2022
I. Compliance with the Wild and Scenic Rivers Act: Identify whether or not any Wild and Scenic Rivers would be potentially impacted by the Project and include conservation measures to minimize such impacts.

Following are specific comments on the Town’s draft EIR:

1. On page 70, there might be an error in the section references as most of the references say Section 0.

Please upload to the Financial Assistance Application Submittal Tool (FAAST) (https://faast.waterboards.ca.gov/) the following documents applicable to the proposed Project following the Town’s completion of the CEQA process: (1) one copy of the draft and final EIR, (2) the resolution certifying the EIR and making CEQA findings, (3) all comments received during the review period and the Town’s response to those comments, (4) the adopted Mitigation Monitoring and Reporting Program and (5) the Notice of Determination filed with the Butte County Clerk and the Governor’s Office of Planning and Research, State Clearinghouse. In addition, we would appreciate notices of any hearings or meetings held regarding environmental review of any projects to be funded by the State Water Board.

Thank you for the opportunity to review the Town’s draft EIR. If you have any questions or concerns, please feel free to contact me at (916) 341-5879, or by email at [email protected] or contact Brian Cary at (916) 449-5624, or by email at [email protected].

Sincerely,
Kristen Way
Environmental Scientist
Enclosures (2):

1. Clean Water State Revolving Fund Environmental Review Requirements

2. Clean Water State Revolving Fund Below-Market Financing for Wastewater & Water Quality
cc: State Clearinghouse
(Re: SCH# 2021050008)
P.O. Box 3044
Sacramento, CA 95812-3044
1671

TOWN OF PARADISE

SEWER PROJECT
Comment Card: To submit comments on the Draft PEIR,
please fill out this comment card then affix stamp and place in the mailbox. ·- 'tO � <-ttu_st OK6. As.

Your comments will be taken into consideration during the preparation of the Final PEIR Name: \} Li:h ,1\ $ /
Address: jf3 4'l/ yY'-Mv u � QJ
]M-a�
Phone Number: 53D-St 4-8S7-�
E-mail: Clu'J.t.o; r e M t. C fM
Submit comments by 5:00 p.m. August 29, 2022:

Colette Curtis
Public Information Officer
Town of Paradise
SSSSSkyway
Paradise, CA 95969
Scan and send to: [email protected]
L2
1672
L3
1673
L4
1674
L5
1675
1 2
3 4
5 6
L6
1676
Wouldn't it be nice if there was a plan to use treated wastewater here in Paradise to irrigate our new golf course?
Other comments: there are septic systems in CA, where there is no requirement for an inspection every ten years.

This is a summary of numerous comments/complaints I received since the question of a sewer for Paradise came up seven + years ago. But, remember, this happened before and the Town Council was 'recalled'!
7 8
9 1677
Department of Public Works Joshua Pack, Director
August 29, 2022
Colette Curtis
Public Information Officer
Town of Paradise
5555 Skyway
Paradise, CA 95969
7 County Center Drive
Oroville, California 95965
T: 530.538.7681
F: 530.538.7171
I buttecounty.net/publicworks
Subject: Draft Program Environmental Impact Report for the Paradise Sewer Project Dear Ms. Curtis,
The Department of Public Works has reviewed the Draft Program Environmental Impact Report (PEIR) that was issued for the public review and comment period on July 14, 2022. Based on our review, the following comments have been prepared under Butte County's authority as a Responsible Agency:
l. Permitting Authority: The PEIR acknowledges that the details of the required permitting and agreements that will be needed for the construction and ongoing operations of the Export Pipeline System within the County right-of-way have yet to be determined. Table ES-1 summarizes the anticipated required project permits and approvals for agencies and jurisdictions (p. xxiv). However, the table does not specify permitting authority for Butte County.

The need for obtaining encroachment permits for work within the County rights-of-way is discussed several times in the PEIR, including Section 1.5 Issues to be Resolved (p. 10). Butte County is a Responsible Agency based on its discretionary approval power over certain aspects of the project including permitting authority which should be specifically recognized in Table ES-1.

2. Impact HAZ-6 Background and Analysis: Section 3.9 Hazards and Hazardous Materials does not appear to provide adequate discussion and analysis on how the proposed mitigation measures will reduce Impacts HAZ-6 and HAZ-7 to a less than significant level. • Impact HAZ-6: Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan
• Impact HAZ-7: Expose people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving wild land fires
The Department requests that additional discussion and analysis should be provided in the PEIR to demonstrate how the proposed Mitigation Measures, specifically MM-HAZ-3, MM-HAZ-4, and MMHAZ-5, will reduce the identified significant impacts to a less than significant level. For example, further discussion providing information on the importance of a Rapid Demobilization Plan and how rapid demobilization will be critical during an emergency would support the proposed mitigation measures.

L7
1678
Both the Rapid Demobilization Plan and Evacuation Warning Procedures should be provided to Butte County Public Works for review as part of the encroachment permit application process.

Please feel free to contact me at (530) 538-7681 or at [email protected] if you have any questions.

Sincerely,
��--
Kim Hunter
Project Manager
Butte County Public Works - Land Development Division
CC: Joshua Pack, Director, Department of Public Works
3 1679
CITYorCHICO
INC 1877

PUBLIC WORKS DEPARTMENT

ENGINEERING DIVISION
411 Main Street, 2
nd Floor Phone: (530) 879-6900
P.O. Box 3420 Fax: (530) 895-4899
Chico, CA 95927-3420 www.ci.chico.ca.us
Colette Curtis, Public Information Officer
Town of Paradise
5555 Skyway
Paradise, CA 95969
August29 ,2022
RE: DRAFT PROGRAM ENVIRONMENTAL IMPACT REPORT (PEIR) FOR PARADISE SEWER PROJECT (SCH# 2021050008)
Dear Ms. Curtis -
Thank you for the opportunity to comment on the above referenced project. The City has reviewed the Draft PEIR and offers the following comments:

The City understands that the Paradise Sewer Project (Project) is a critical component to the Town of Paradise's (Paradise) overall Camp Fire recovery effort and that the design of the project is in an early phase. Given the scope of the Project, the alignment of certain segments of the proposed pipeline, the location of associated equipment located within or adjacent to the City limits and Sphere of Influence, and the pipeline's ultimate connection to the City's Water Pollution Control Plant (WPCP), we look forward to coordinating closely with Paradise during the design, construction, and implementation phases of the Project.

Close coordination will be particularly important for numerous reasons, including, but not limited to:
1) Avoiding potential conflicts between the Paradise Sewer Project and the City's proposed infrastructure projects that are located along or adjacent to the Project's proposed alignment (e.g., the P-18 sewer trunkline segments located within the railroad grade in South Chico and within the Entler Avenue and Midway rights-of-way, the intersection improvements at Hegan Lane and Midway, etc.).
2) Ensuring collaboration regarding the design of those project components (e.g., the Transition Chamber located off lower Skyway, the Flow Control and Metering Structure proposed near the WPCP, and all connections to the City's existing and proposed facilities) that are located within or adjacent to the City to avoid and minimize the potential environmental impacts (soil contamination, water pollution, odors, etc.) that could result from system failures.

The City appreciates Paradise's inclusion of the permitting requirements in the PEI R, including the Sanitary Sewer Systems General Order and associated conditions requiring the preparation of a Sewer System Management Plan and an Overflow 11 D 'i tr n A C b '-'
1 2
L8
1680
234
1681
1 2
3 L9
1682
4 5
6 1683
7 8
9 10
11 1684
Date: August 29, 2022
To: Marc Mattox, [email protected]
Cc: Kevin Phillips, [email protected]
Colette Curtis, [email protected]
From:

Re:

Marc,
Dana Ripley, PE, [email protected]
Paradise Sewer Project, Draft Program EIR
Public Comment
The opportunity to provide this public comment on the Paradise Sewer Project Draft Program Environmental Impact Report (PEIR) is appreciated. As you are aware, I have been advocating for nearly two years a local water reuse project in Paradise as an alternative to the 18-mile wastewater export identified as the superior project in the draft PEIR. On November 30, 20211 submitted to your office a white paper entitled Town of Paradise, Butte County CA, Sewer, Water Reuse and Wildfire Defense Integrated Plan (SWRWD Plan). That white paper is included in this public comment as Exhibit A.

In light of the broad implications of the export versus local reuse options for Paradise, it may be instructive to consider the California Environmental Quality Act (CEQA) Guidelines which includes as an advantage of the "Program" EIR1 the following:

Allow the lead agency to consider broad policy alternatives and program-wide mitigation measures at an early time when the agency has greater flexibility to deal with basic problems or cumulative impacts.

This public comment will attempt to respond to the draft PEI R's assertions that the SWRWD Plan is infeasible and further highlight the benefits to Rebuild Paradise goals and aspirations for restoring a vibrant community with state-of-the-art infrastructure to serve many generations to come. This PEIR is now at an early time when Paradise has the opportunity to reconsider broad policy alternatives that may have been overlooked or misunderstood in the draft report.

This draft PEIR public comment is presented as follows.

Area of Known Controversy #1: Growth Inducing Impacts
The draft PEIR, Section 1.4, recognizes that there may exist growth inducing impacts specifically in the City of Chico and rural Butte County outside of Town and City limits.

In a November 4, 2020 letter from the Central Valley Regional Water Quality Control Board, Region #5 (RS) addressing the local facility versus regional alternatives for Paradise, the statement is made that the "Pipeline to Chico can be cost-effectively sized to accommodate a large range of flows." In a tabulation of pipe carrying capacities of the 10.5 mile 12" diameter export pipe force main along the valley floor (from Skyway at Butte Creek to the Chico WPCP) utilizing reasonable flow velocities ranging from 3 feet per second (fps) to 7 fps2
, the available capacity could potentially be as high as 1.758 million gallons per Paradise Sewer Draft Program EIR
DKR Public Comment

Page 1 of 5 ends

L10
1685
1686
1687
1688
1689
1690
1691
1692
1693
1694
1695
1696
1697
1698
1699
1700
1701
1702
1703
1704
1705
1706
1707
1708
1709
1710
1711
1712
1713
1714
1715
1716
1717
1718
1719
1720
1721
1722
1723
1724
1725
1726
1727
1728
1729
1730
1731
1732
1733
1734
1735
1736
1737
1738
1739
1740
1741
1742
1743
1744
1745
1746
1747
1748
1749
1750
1751
1752
1753
1754
1755
1756
*
=. .^, 9':V
iFF €
= =*a*ii- * 9 tr<E i' i. d =;'E
{
=^9-<rC 3 E=.q;= qr eD o FaFEEl:3
E HilYE
-'
PHH"
- =t g
h
o
oa
a(,otJhJtJ
= l't) ile
EIE
el=@ I'i?ls313 el>al lq*lEsli
lzl3IIlrt) la
l5az
g$?5F d",- E
o
.sFqiS ejglF \c a-q ts E't s=()
o{*
s?
n-l^-O
=€3^o:1==4
(.Dl)ii (D=a-(D-Y{ ocd 0e-$v5Errt
= fre
-'tr v.E. g8
U(D
-
ox
o.z, as
q=.o- L6 ii- 'o=5
"a ?;
0a o'
'^J 00=9
o=
=oa 6=
6<
EE
a-.=
6=
t)FI U:=f-Y ii o< 99o rix=9rn g. ffg
rd
=' Fo
(la
oo<=Oa
gT*i=
i'E EEEE *; coB o 13
F=#.;F h'n o
3 =
.i'F
=. 9'e. a
E
s '{P
=
-
tJ r-t , 6.=rQ <l
5 5 Fe(rb ri i: +f;q e'pBg a' E ='3 s€Eg u o':;
*stre 5Q s f
-
r' YcrX=
A A -)vY
- ::.$ 6
= a-a ^ \e o ^. () !: =-oc ,-XLV ---^
sg€E rg3s ^aWr- gjFE ai?'
X iw15 () g rJ
= ==x\) A'o T'X O,=i) 3 q8.

EF9 -- 3 ac. (!(D
I
ooca.=) o- -.6i a\o s8
<3
EgwGEV,(D9d=' oq==o.
d5<
6(?Y-=rn id nO:o
too
Oc
ooT,c
tt
tJ
o
(?ooo'{,og
(}
(t
U
od
oa
a
oa
oUrllF
V--W A/e. 5oox> 3,e83 !T3'(?- v'JA'.. aEie- s'r
=,ts
e P4-

OA P (D CLJ
=.=.F= ed = c) ooo..3
3 9€ r
A < 2 6 z=' 3-l19F RE o 6'3 ;* 9a3 F6
= {6 E igg
3 - =.v a2
= e-9e i.r v tlJ ..p-ts- f g"E;1 l3)Y F = =
H D FS? A--rg Ir16
g
&.F 9'9
q
E *
=
3i
' ^ (Y
- . l,
.
-
J I HV-.b
*€ s€ 5K96.
-At- ps i3 '".5 a9 a*6 i
:€ :.3 !'!i a'
g"a gF6'Tc- 7 ii=- v,(!o
L11
1757
E?iFE€FF+Ag
geEggEl33il;
iFsgFlia*EFa ?si+[ri€3si;
gglEl;geIggE
ic ge+ g i-IV+ I : ry!e{3€Egrgli'
liiiEEEEsgll
EgggTgFEEiE
(D
7 F
- 'j"-85+: - - v. P-O ri.i -=
= R 6 *egr=.9 =t!:/a 'a ) = = i i I F i.F =:" i.e? =9 P H > 3 = 3='5 a= E o d 1.. *.6 o 3 6 3ee g 3 g &E E:: i;37= =
F i€I I =i -:-rOg.g=(-61 €= 8* nE9,= r-zi" '-'9 6 ffi?L F3gg33FF .aAA
aH-rv e:-L/ar.=
=7!S!.r,6 = = = - - c.= )iFiTO='c.- 6 a: =fi e
P ii = Y 3 +2p d€ E E 6:. A _rr^__Y
= ='€
a'x a 6' iil o. (- l,'o *<
= g?"ai F! g
= =:6 = oQ-q sa#ei9i 9-q€=X'W ;: E q3 f i=.8
E 9E 3E (D =.'9 =.7 ^
=
a 5I &E
F 6 'o 2 !r a 5.-
=t = -.'J, t)4
= 9 9R = I 9
€
e
= ;7 -c = .6. -'E x : D -o ?' 's EG-9.==
R
e.-^ d = # ii'o R u € 6 ='
a Y?= '' ;o5 I -tf
>_ I 5
=.E
F 3
F
gFgiE??;-
1^rVBr-A' d-;i99=oE.l]=
ei3iasrtg i 3 F.=a15E.Fe
seiF!#sEE =.3i!1.;EEP
rggg€ aEtE:
: aEEgi A+, =; >5.6 E 3.
- 1s geEE;ga 6=Potz)1 9=6- sE;;€ e'9s"" HE+a?EFiF
s E g;g a f I +FcFEtF; GB-)icr.
=g A;g€ i a F
F
gEeT?Eizo = = = 6 7e -: +r()-()6-t)-: qSETaSs€
p
=
; ; =E'{
= ciP'aOo,i-El qEAT i8 F iEAE FE f ?v; o ^ - (' l, -o.

J
og* E gF€g IEe 3EgElilEEli ErFgsifEiir lEFEEg1*gg ==c.ooE.sf,a.F taFi€ g*1E=v cll€ F$ FtE i -.:-r^\-. 1- f/-L, i g g': 3 f .? B T f i€El3ilHf;
g FE IESgE EE
??=€EE Fet???r*3 IiF rg= E3 F*[ggf= 8 e 236_
hJ
1758

8. However, the most egregious legal inadequacy of the DPEIR is that it is barely readable and understandable, due to the Jack of a Table of Contents and inadequate organization and disclosure of the Comments made during the Notice of Preparation process. The DPEIR glosses over the numerous comments and objections that were made in the Notice of Preparation process. Specirically, without having the Town General Plan updated since 1980, the changes in density requirements and other legislation that has been adopted by the State Legislature to provide for more dense residential dwelling units and reduction of Green House Gasses are barely even mentioned in the DPEIR, which results in accelerated "urban sprawl" within the Town's Sphere of Influence. Instead of focusing on dense multi-story a1\d affordable multifamily housing in the Town's previously developed urban footprint, the "Preferred Alterative" supports and incentivizes accelerated inefficient sprawl in the Town and into the County's Jurisdiction.

9. Finally, the DPEIR's failure to adequately disclose, analyze, discuss, consider, and compare and contrast the expense of the Preferred Alternative to the more efficient and expm1dable specially engineered waste treatment facilities discussed in great length in the Comments submitted by Dana Ripley in his Comments and "White Paper" demonstrates the legal inadequacy of the DPEIR and the failure to proceed in the manner required by law, pursuant to Public Resources Code sections 21 I 68 and 21168.5.

Please include this letter and Comments in the Record of Proceedings and include all of the Comments made regarding the Notice of Preparation previously relied upon by the public to review this very expensive and unnecessary public project in a Revised and Amended Draft ElR for the Prefen-ed Project, instead of Program EIR for this vague, inadequately described, and expensive "Preferred Project". In addition, please remand the review of this proposed project back to the Public Works Department Staff for the preparation of an updated Project Review and Analysis, based on current water resource conditions and Wildland Urban Interface (WU!) environmental setting and background on the Town of Paradise, in the light of the Governor's Water Resiliency Portfolio and recently adopted Water Policy focusing on more efficient use of our water and energy resources. Finally, the Town of Paradise should be required to conduct the updated Study while contemporaneously updating the Town's Genera I Plan,
Thank you for the opportunity lo comment on the DPElR. Please put me on your circulation list for the this Draft EIR and/or any changes in the process, including recirculation of a revised or amended NOP, Project Description, and/or revised or amended Draft EIR for this amorphous project.
cc: Steve Lucas, Butte LAFCo
Brad Stephens, County Counsel
Butte Environmental Council
Sierra Club of Califomia
Smart Growth Advocates
RLH/hr
Very truly yours, (,,
f?..�,,L,__f) ;2, I!,,...___
RJCI•I.At(D L. HARRIMAN
3 10
11 1759
1760
1761
1762
1763
1764
1765
1766
1767
1768
1769
1770
From: Kalaskar, Tanya
To: [email protected]
Subject: Paradise Sewer Project Draft PEIR is Available! Date: Thursday, July 14, 2022 2:45:00 PM
Attachments: Paradise Sewer Project_Notice of Availability.pdf Hi,
Please find attached the notice for the release of the Paradise Sewer Project Draft Program Environmental Impact Report (PEIR). The Draft PEIR is available at the following websites: Town of Paradise or Town of Paradise Sewer Project. Refer to the attached notice for information about document availability, public review period, submitting comments, and public meetings. Please reach out to me at [email protected] if you have trouble accessing the attached notice.

Thank you,
Tanya
Tanya Kalaskar
Environmental Planner
HDR
100 Pringle Avenue, Suite 400
Walnut Creek, CA 94596
D 925.974.2652 M 213.477.3824
[email protected]
hdrinc.com/follow-us
1771
Submission Date Letter Number/ # Comments First Name Last Name Comment Jul 17, 2022 W1/1 Alice Patterson Good morning--
I am inquiring for my partner, who lost his home in the fire... How do I find out if his property would be affected by an Easement should this sewer project be approved? This could impact how/when he rebuilds. Property address is 5975 N. Libby. Is there a list of locations where the easements would be going?
Thank you.

Alice
Jul 25, 2022 W2/1 Linda Barton I am about to choose a builder to finally rebuild in Paradise. At this moment, it appears the sewer project for Paradise will help those businesses on Skyway. Which means 99%+ of the residents won't benefit from this undertaking. Who is going to pay for this very expensive but necessary project? I am not interested in seeing it listed when I get my property tax bill.

Jul 28, 2022 W3/1 Kat Carlisle Hello,
Can you tell me when the final design and right of way acquisition phases will begin for the Paradise Sewer Project please?
I saw on the project schedule that these phases are anticipated to begin in Summer 2022, but I wasn't sure if that meant they have already started or not.

Thank you!
Aug 1, 2022 W4/1 Earl Eckert Will the agreement with Chico permit all pumped septic loads to be disposed of in paradise rather than continuing to be disposed of at the County land fill lagoon.

Own property at 2199 De Mille Rd.

Aug 2, 2022 W5/1 Pam Galloway I think it is a stupid waste of money that could be used for a different project. The cost of the project, the amount of time necessary to complete the sewer project and the number of people who would benefit from it should make it a non starter.
1772
Submission Date Letter Number/ # Comments First Name Last Name Comment Aug 3, 2022 W6/7 brian Questions of concern from a 29 year licensed wastewater career in California:
1) Who will handle the collection system and pump stations daily operations? 2) What type(s) of odor control systems will be used? And projected annual cost? 3) Where will biosolids and sewage debris be removed to? 4) How many full time employees will be hired to operate and maintain Paradise Wastewater Collection and Transportation?
5) Under what jurisdiction/license will Paradise Wastewater be in compliance with State Water Resources Control Board?
6) What city department will oversee Paradise wastewater operations? Yours,
Brian Anderson
Aug 5, 2022 W7/1 Ivan Garcia Good luck on the project. Would like to encourage and support the paving of a multi-use path on top of your sewer line with the ability to connect this new path to the intersection of Honey run/Skyway near Skyway golf park on the west and to the Paradise Memorial Trail in Paradise. I would suggest paving so that you can send emergency equipment up the hill to fully utilize the Skyway for emergency evacuations.

Thank you.

Aug 5, 2022 W8/1 Joe Rees Hi,
As natural disasters increase in frequency and severity, climate change is becoming harder and harder to ignore. The rise in these disasters along with an overall growing sense of crisis when it comes to the environment is causing an increase in climate anxiety. In fact, a recent Yale survey ound that 70 percent of Americans are now “very or somewhat worried about global warming.” I thought this would be an interesting topic to cover in a guest article for your website. I would address the increase in climate anxiety and what your site visitors can do to relieve their stress while also helping the environment. What do you think?
Thanks so much for your time,
Joe Rees
[email protected]
1773
Submission Date Letter Number/ # Comments First Name Last Name Comment Aug 8, 2022 W9/4 Rick Hoddinott 1. Along the proposed alignment for the export pipeline on Entler Avenue, what is the pipe constructed of and where will it be located along the roadway?

2. How will the project address nearby wells which may be located near the proposed alignment?

3. Was the old railroad (Old Sacramento Northern) right of way considered for the pipe alignment in lieu of Entler Avenue?

4. During construction, how will the project address temporary traffic control along Entler Avenue, considering CHP uses the roadway as direct access.

Aug 10, 2022 W10/1 Ronald Lassonde I am very impressed with the due diligence that the Paradise Town Staff has put into the Sewer EIR. The Sewer is absolutely necessary for businesses to rebuild in our Down Town. A rebuilt Down Town is critical to the overall recovery of our town.

We need the PEIR approved as soon as possible so we can move forward and rebuild our Town Aug 10, 2022 W11/1 Mandi McKa7 HelloChico Velo supports the Town of Paradise and the Sewer Project and encourages the project or project sponsor to include the paving of a multi-use path for bicycles and pedestrians on top of the proposed project.

Currently, Skyway is not a safe route for bicyclists or pedestrians traveling to or from Paradise. This project provides a unique opportunity to solve dual challenges of meeting the need for wastewater infrastructure and also providing a safer, more direct route between Chico and Paradise for bicyclists and pedestrians. If the new multi-use path followed the sewer line all the way to Southgate Lane on the East side of Hwy 99, it would connect users to the existing Midway bike path on the West side of 99.

Additionally, a multi-use path could enable emergency equipment to drive up the path and allow Skyway to be fully utilized as an emergency evacuation route.

Thank you for the consideration- please let us know if you have questions or if Chico Velo can provide additional support.

Thank you.

Aug 11, 2022 W12/1 Andrew D'Lugos Currently, Skyway is not a safe route for bicyclists or pedestrians traveling to or from Paradise. This project provides a unique opportunity to solve dual challenges of meeting the need for wastewater infrastructure and also providing a safer, more direct route between Chico and Paradise for bicyclists and pedestrians.

I fully support the plan of paving a multi-use path for bicyclists and pedestrians. 1774
Submission Date Letter Number/ # Comments First Name Last Name Comment Aug 11, 2022 W13/1 Kirk Monfort This would be a great opportunity to build a bike path to Paradise that would tie into the current Paradise Bike Path that goes from the Paradise Park up through Magalia. We be never had a link from Chico to that Bike path although the right of way has been preserved from the Midway by Hagen Lane. It would also provide for service and inspection of the eventual sewer line. A Dual Use facility. There might also be transportation dollars available to do this.

Aug 15, 2022 W14/1 Richard Stone JUST PAVED ALL OF SKYWAY, IT'S REALLY A NICE ROAD. I HOPE THAT THE NEW ROAD WILL NOT BE DUG

UP FOR THE SEWER PIPE AND JUST PATCHED UP TO LOOK LIKE CRAP AS THE UNDERGROUND PGE SUB COMPANYS HAVE DONE IN TOWN. SHOULD HAVE WAITED ON THE PAVING UNTILL THE SEWER WAS PUT IN. THEN PAVE THE SKYWAY.

Aug 16, 2022 W15/1 Joseph Mount I was informed that the treatment plant had treated water they wanted move .

Would you please send me any test result on the treated water .

Thank You Web site OkaVate.com
Aug 22, 2022 W16/6 brian anderson I have not read in the reporting the following:
1)What agency will have jurisdiction to provide collection services within the Town of Paradise? 2) Who holds the license to operate wastewater services within Paradise jurisdiction? 3)Who will maintain and operate the pump stations ?
4)What methods of odor control will be employed at each pump station, wet well and other areas where wastewater may come in contact with atmosphere?
As a retired SWRCB licensed WWTP operator of 29 years in the Bay Area the question above are very relevant.

Odor mitigation is of critical importance to our community. 24 hour response to spills and overflows is critical.

An 18 mile pipeline with about a 1500 ft elevation loss, gravity flow management is critical and demands highly skilled personnel.
1775
Submission Date Letter Number/ # Comments First Name Last Name Comment Aug 22, 2022 W17/8 Steven Cismowski I am writing in opposition to the proposed Paradise Sewer Project. Given the increase of ground water concerns in the north state, coupled with the impacts the current and projected drought cycle is having on our groundwater resources, this project is perilously flawed. In my review of the PEIR, I could not find any information addressing the following items:
1) Information is needed regarding the projected increase in size of the current Chico Wastewater Treatment Plant in order to accommodate this increase in treatment. Keeping in mind Chico's current growth-rate and several other LARGE development projects that will also increase demand on this facility - Valley's Edge and Barber Yard, this facility will need to expand, but to what extent? 2) Information and analysis are needed to fully understand the impacts of removing the equivalent of 1/8th of Big Chico Creek's average annual flow out of the current hydrological cycle based on projected peak flow at sewer build out. The long-term impacts of effectively pumping that much water out of the hydrological cycle helping feed local aquifers and creeks (chiefly, Butte Creek, the last viable salmon run off the Delta river system) is unconscionable. Paradise, pre-Camp Fire, was renowned for its forest, largely of Ponderosa pine, growing at lower altitudes than commonly encountered. The additional ground water these trees received from leach lines, not to mention additional nutrients, helped support this rich forest. Taking that life support away will certainly forever change the forest of Paradise's future canopy. Property owners wishing to replicate that forest will need to pump even more ground water to use in their landscapes further exacerbating the drying of downstream aquifers. 3) The proposed path crosses three surface flow creeks (Butte, Comanche and Little Chico) that countless wildlife (and residents) relies on for sustenance and recreation. While the current engineered solution for these crossings may provide sufficient cover, over time, erosion will continue to drop current creek elevations eventually exposing these lines making them vulnerable to damage and leakage. 1776
Submission Date Letter Number/ # Comments First Name Last Name Comment 4) The system will require frequent clean out and regular servicing in order to remain functional. To fail to do so could result in calamitous disaster and contamination of numerous entities (rivers, creeks, farmland, etc.). Encumbering future municipal operations with this laborious task over such a long pipeline will certainly result in failure and/or increased costs to the consumer. There is simply no way to guarantee that funding for this team of pipeline workers and equipment will be sustainable. 5) Paradise's septic waste system served to provide a governor to check unbridled growth. Removing that check, will certainly further increase Paradise's growth potential resulting in an escalating list of longterm impacts for future Butte County residents. The increase growth potential will make future fire suppression impossible, trigger roadway expansion, increase sprawl and further tax our limited natural resources, most acutely, our water resources.

This country has a rich history of failed environmental engineered solutions to current challenges.

Measures like this start out seemingly a "good idea at the time" only to create unforeseen impacts for future generations to solve. I encourage you to reconsider grandfathering in previous property-owner's septic systems to allow our neighbors who have suffered so much to return to their homes and preserve the future of Paradise by ensuring large developers a toehold to urbanize our beloved mountain communities.

Aug 22, 2022 W18/1 Ryan Duncanwood ITS GOOD
Aug 22, 2022 W19/1 Bud Linggi I lived behind the Optimo Lodge from o/a 1948 until I went into the Service, 1960. Of course, along the way of those years, my dad went to Chico, down Neal Road, for the Crocker Bank and I might have accompanied him and used a restroom after he made the deposit.

By this time, local dogs wiped out our chickens and after the Crocker Bank, we went to a Chico outfit that gave us the number of cleaned chickens we needed.

The following week our destination was some place in Oroville for the steaks we needed for the next week, a long trip down Clark Road was used.

So when talk of sewers for Paradise comes up, I remember the leech fields where I got my fishing worms... Bud
Aug 22, 2022 W20/1 Diane Pajouh I would like to request that we do not damage our new Skyway Roads that have just been installed/updated. Thank You.

Aug 22, 2022 W21/1 Mike Petersen Has the town looked into putting turbines inside the 18 mile pipeline to generate electricity? I believe this has been done in other cities and might give Paradise a chance to control our own energy independence.

Aug 22, 2022 W22/1 Michael Schwartz Not the best idea they have. For too many reasons. I vote no. 1777
Submission Date Letter Number/ # Comments First Name Last Name Comment Aug 22, 2022 W23/4 Gary Wolt What policy is in place to control cost increases in the future? Will the town of Paradise be subsidizing Chico's wastewater system , with no control on whatever increase they want or need. The ability to justify any price increase seems to be a normal phenomena.

Are they incorporating Any valving in the design for emergency use in the event that the pipeline or Chico's waste water facility experiences a catastrophic failure? Would valving be in place to allow Paradise to construct there own wastewater facility, or have a load out facility at a future point in time?
Aug 23, 2022 W24/1 Matthew Carlson I support the sewer project and along with it believe a multi use path would be an invaluable asset to the community. It would encourage community health and growth. Paradise lacks safe routes currently so this is needed.

Aug 23, 2022 W25/1 Tony Catalano Please include a bike lane! Aug 23, 2022 W26/1 Rob Williams Caltrans funded a bike riding tourism study and our Final Report identified several Signature Bikeway Routes ie East Bay Mud Pipeline. The report has an economic analysis of adding bike/walking paths to a local economy. See, BikeValleytoSierra.com
Aug 24, 2022 W27/1 Kevin Baxter I would like to mention my support for the addition of a multi use path along the Skyway during construction of the sewer line. This path would be of historic interest as it would continue the "line" used by trains in the past as well as provide a safer route for non motorized travel to and from Paradise via the Skyway. The path would also be a viable option as an alternative route for emergency vehicles or as an additional route of evacuation, should the need arise. Thank you in advance.

Kevin Baxter
Aug 24, 2022 W28/1 Steve DePue It would be an ideal time to put in a wide paved bike trail up to Paradise on the skyway corridor. You could also put in fiber optical cable for internet use along the same right of way with the sewer project.

Take advantage of multiple uses for the construction project on the sewer system. Also, the paved bike path provides superior access to the fiber optical cable and sewer lines when repairs or access is needed.

Perhaps power could also be delivered from the Chico area to Paradise in an underground line rather than on poles! Planning makes for a better future!
Aug 24, 2022 W29/1 Andrew Keller I support the project and encourage the project to include a multi use paved path for bikes and pedestrians on top of the sewer project. Such a path could be used by emergency equipment to drive up the hill even while Skyway itself is functioning as a one-way downhill evacuation route. This is a great opportunity to also include new regional multi-use non-motorized path to connect Chico and Paradise from the intersection at Honey Run and Skyway to the Paradise Memorial Path Aug 24, 2022 W30/1 William Llamas Seems the Draft PEIR a done deal? So confusing. We need a more comprehensive review other than a commission and/or Board. A citywide meet up for face to face speaking is necessary. And are there any ideas on building UP in downtown. Apartment buildings may be most suitable for many residents. What about beautification projects with help of citizens? So many ideas and no leadership. Time is a wasting and we should have already planted thousands of trees.
1778
Submission Date Letter Number/ # Comments First Name Last Name Comment Aug 24, 2022 W31/1 Bruce McLean I live along the Little Chico Creek bike path and have cycled to Paradise up the Skyway at least once a month over the last 7 yrs.

It was very disappointing not to see a dedicated two-way bike path installed when PG&E put their electrical infrastructure underground. Then it was extremely disappointing when a dedicated bike path was not installed when the Skyway was recently paved.

Let's not strike out by not creating a dedicated bike path when the sever line is extended from Paradise to Chico.

Aug 24, 2022 W32/1 Jeri Valdez I decline the project in it's entirety! If it does not service ALL main roads as well as the WHOLE community. What is the point? Makes no sense at all.

Aug 25, 2022 W33/1 Kevin Cook I support the project and encourage the project to include a multi use paved path for bikes and pedestrians on top of the sewer project. This path could be used by emergency equipment to drive up the hill even while Skyway itself is functioning as a one-way downhill evacuation route. This is a great opportunity to also include new regional multi-use non-motorized path to connect Chico and Paradise from the intersection at Honey Run and Skyway to the Paradise Memorial Path. I am an avid local cycler and this would only encourage more cyclists to come visit and recreate in our community.

Aug 25, 2022 W34/1 Kim Hunter I am preparing comments on behalf of the Butte County Public Works Department. Is there an email address that can be used to send comments on Monday?
Thank you,
Kim Hunter, Project Manager
Land Development Division
Butte County Public Works Department
Aug 25, 2022 W35/1 Monica Zukrow I support the project and encourage the project to include a multi use paved path for bikes and pedestrians on top of the sewer project. Such a path could be used by emergency equipment to drive up the hill even while Skyway itself is functioning as a one-way downhill evacuation route. This is a great opportunity to also include new regional multi-use non-motorized path to connect Chico and Paradise from the intersection at Honey Run and Skyway to the Paradise Memorial Path. Thanks for your consideration!
Aug 26, 2022 W36/2 David Copp It seems as though the Draft PEIR has been reasonably well considered. We will never know all of the impacts in advance, but the benefits of the project seem to outweigh the impacts, and it needs to progress.

Aug 26, 2022 W36/2 David Copp We think the sewer coverage area should be expanded. We have a multifamily property at 5830 Greenthumb Lane, which is just outside of the coverage area, even though it covers the area essentially across the street (Elliott Rd). We would like to have our property included, please. Thank you Aug 26, 2022 W37/1 Maurine Hansen I just finished paying off a $22,000.00 hookup bill in another address. We were not in the zone to be on the first to hook up from septic, to sewer, so were required to wait. We were not able to hook up, but years later we were required to and the price hugely increased. We were told the cost would be even more if we didnt do it "now". I now live in a zone that is not part of the first hook ups. Does that mean another huge financial cost to me, in the future?
1779
Submission Date Letter Number/ # Comments First Name Last Name Comment Aug 28, 2022 W38/1 Roger Cole The proposal to hook Paradises new sewer system to an expanded Chico sewer water treatment system at the Sacramento River sounds good at first. It saves money and utilizes efficiently excess capacity of said water treatment facility. It also simplifies Paradise’s process into a pipeline construction project.

However, as we all have noted from the years of the long ongoing drought, the foothills need every drop of water they can get and /or save or reuse. This plan will export millions of gallons of water from Paradise, and therefore is not good. Instead the wastewater should be treated and returned as close as possible and feasible to the water area it comes from.

The single best feature of the existing septic tank/reach line system has been retention of treated wastewater in the ecosystem.

A similar goal can be accomplished by constructing a primary sewage treatment plant in Paradise followed by a final treatment in a constructed wetland polishing system. This will produce many local benefits.

After the wetland the water can flow to another reservoir location or allowed to be absorbed into the ground or flow through a stream, other kind of recharge. The benefits of retaining water cannot be overestimated. Streams with added wastewater-effluent can improve water quality and support water reuse, while creating habitat and providing urban amenities The Cost–benefit analyses of stream-flow augmentation projects many times fail to account for the full value of ecosystem services provided, including renewed habitats and enhanced urban amenities.

Sincerely,
Roger Cole, Forest Ranch, CA
1780
Submission Date Letter Number/ # Comments First Name Last Name Comment References:

Constructed Treatment Wetlands (PDF)
Phoenix Arizona Constructed wetland Project (EPA)
In 1990, city managers in Phoenix, Arizona, needed to improve the performance of the 91st Avenue Wastewater Treatment Plant to meet new water quality standards issued by the Arizona Department of Environmental Quality. After learning that upgrading their treatment plant might cost as much as $635 million, the managers started to look for a more cost-effective way to polish the treatment plant’s wastewater discharge into the Salt River. A preliminary study suggested that the city consider a constructed wetland system that would polish effluent, while supporting high-quality wetland habitat for migratory waterfowl and shorebirds, including endangered species, and protecting downstream residents from flooding at a lower cost than retrofitting their existing treatment plant.

As a result, the 12-acre Tres Rios Demonstration Project began in 1993 with assistance from the U.S.

Army Corps of Engineers, the Bureau of Reclamation and EPA’s Environmental Technology Initiative and now receives about two million gallons of effluent per day.

The demonstration project was so successful that the city and the Bureau of Reclamation asked EPA for help in expanding the project to a full-scale, 800-acre project. For more information on the Tres Rios Constructed Wetlands Project, visit, http://phoenix.gov/TRESRIOS/ Constructed Wetlands: Using Human Ingenuity, Natural Processes to Treat Water, Build Habitat March, 1997, Joe Gelt, Water Resources Research Center (WRRC), Pub. Arroyo, vol. 9, no. 4, Water Resources Research Center, Tucson, AZ, March, 1997
EPA Document: Guiding principles for siting, design, construction, operation, maintenance and monitoring of constructed treatment wetlands
http://nepis.epa.gov/Exe/ZyPDF.cgi/2000536S.PDF?Dockey=2000536S.PDF

STATE OF CALIFORNIA- REGIONAL WATER QUALITY CONTROL BOARD STAFF SUMMARY REPORT (Jessica Watkins) MEETING DATE: April 12, 2017 City of Pacifica, Calera Creek Water Recycling Plant and Wastewater Collection System, Pacifica, San Mateo County – Reissuance of NPDES Permit January 2012 – Permit reissued Wastewater-effluent-dominated streams as ecosystem-management tools in a drier climate Front Ecol Environ 2015; 13(9): 477–485, doi:10.1890/150038 Richard G Luthy1,2*, ET al., Summarized
As the water requirements of human populations increase and stream flows diminish in water-stressed regions, the base flows of urban streams are becoming increasingly dependent on wastewater Ecosystem services in wastewater-effluent-dominated streams can improve water quality and support water re-use, while creating habitat and providing urban amenities Cost–benefit analyses of stream-flow augmentation projects often fail to account for the full value of ecosystem services provided, including renewed habitats and enhanced urban amenities Aug 30, 2022 W39/1 Dannette Barefield I support the pier project Aug 30, 2022 W40/1 Patty Wilson I only wanted to know how the sewer was going down the hill. After repaving the skyway, I would hope you would not have to dig it back up. I can not see where the town plans on digging. 1781

were not]
was not]

2. _______________________________________
_________________________________________ _______________________________________ Print Form
Notice of Determination Appendix D
To: From:

Office of Planning and Research Public Agency: ___________________________ U.S. Mail: Address: ________________________________
P.O. Box 3044
Sacramento, CA 95812-3044
Street Address:
1400 Tenth St., Rm 113
Sacramento, CA 95814
_______________________________________
Contact: _________________________________
Phone: __________________________________
County Clerk
Lead Agency (if different from above): County of: _________________________________ Address: __________________________________ Address: ________________________________ Contact: _________________________________
Phone: __________________________________
SUBJECT: Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code.

State Clearinghouse Number (if submitted to State Clearinghouse):______________________________ Project Title: _________________________________________________________________________ Project Applicant: _____________________________________________________________________ Project Location (include county):_________________________________________________________ Project Description:

This is to advise that the ____________________________________________ has approved the above ( Lead Agency or Responsible Agency)
described project on _______________ and has made the following determinations regarding the above (date)
described project.

1. The project [ will will not] have a significant effect on the environment.

2. An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA.

A Negative Declaration was prepared for this project pursuant to the provisions of CEQA.

3. Mitigation measures [ were made a condition of the approval of the project.

4. A mitigation reporting or monitoring plan [ was was not] adopted for this project.

5. A statement of Overriding Considerations [ was adopted for this project.

6. Findings [ were were not] made pursuant to the provisions of CEQA.

This is to certify that the final EIR with comments and responses and record of project approval, or the negative Declaration, is available to the General Public at:
___________________________________________________________________________________ Signature (Public Agency): _____________________________ Title: ____________________________ Date: _______________________________ Date Received for filing at OPR: ____________________ Authority cited: Sections 21083, Public Resources Code.

Reference Section 21000-21174, Public Resources Code.

Revised 2011
November 7,2022
The Town of Paradise is proposing to construct, operate, and maintain a new sewer collection system within the Town limits that includes an 18-mile export pipeline from the Town to the Chico Wastewater Pollution Control Plant. The Proposed Project would consist of three primary components: Core Collection System, Export Pipeline System, and Extended Collection System. ■
■
■
Town of Paradise
5555 Skyway, Paradise, CA 95969
Marc Mattox
530-872-6291
Butte
155 Nelson Avenue, Oroville, CA 95965
Paradise Sewer Project
2021050008
Paradise, Chico, and Butte County
Town of Paradise
Town of Paradise
Town of Paradise, 5555 Skyway, Paradise, CA 95969
1782
Town of Paradise
Council Agenda Summary
Date: November 7, 2022
Agenda Item: 6(a)
ORIGINATED BY: Ashley Stanley, Engineering Division Manager REVIEWED BY: Kevin Phillips, Town Manager
SUBJECT: Paradise Sewer Project Division of Financial Assistance Authorizing Resolution for Funding Applications

LONG TERM
RECOVERY PLAN:

Yes, Tier 1 “Sewer”
COUNCIL ACTION REQUESTED:

1. Consider adopting Resolution No. 2022-__, A Resolution of the Town Council of the Town of Paradise Authorizing A Financial Assistance Application To The State Water Resources Control Board For The Paradise Sewer Project And Designating The Town Manager Or Designee To Sign And Submit The Application
Background:

Since its incorporation in 1979, the Town has sought a formal wastewater treatment solution for the community, with service for commercial and densely populated residential areas being a priority. Failed and failing septic systems create public health and environmental concerns and have limited economic growth. Prior to the Camp Fire, which almost completely destroyed the town in 2018, Paradise was the largest unsewered community in California. The Town has prepared numerous studies to address its need for a centralized wastewater treatment solution, and in its most recent study, the Town identified a proposed sewer service area. The proposed sewer service area includes the Town’s commercial corridors, and as described in the 2017 feasibility study, it represented the area that had the most septic systems that had failed or were projected to fail by 2022.

The Proposed Project would consist of three primary components: Core Collection System, Export Pipeline System, and Extended Collection System. The Core Collection System would support the centralized businesses and housing in Town, including approximately 1,500 parcels along the Skyway, Clark Road, and Pearson Road corridors. The proposed Export Pipeline System would start at the southern end of the Core Collection System as a gravity sewer line and would continue southwest approximately 18 miles to the City of Chico for connection to the Chico Water Pollution Control Plant. Other than the Town of Paradise flow, no other connections will be allowed to the export pipeline. The Extended Collection System would be an extension of the Core Collection System that would allow collection of sewage from parcels outside the Core Collection System, but within the Town limits.

The Town of Paradise is seeking construction funding concurrently to related environmental review procedures to maintain readiness
Analysis:

The Budget Act of 2021 (Senate Bill 129 and Senate Bill 170) appropriated $1.55 billion to the State Water Resources Control Board (SWRCB) in item 3940-106-0001 (the Infrastructure Appropriation). The budget bill specifies that $650 million (M) is for wastewater projects, with priority given to septic-to-sewer conversions.
1783
The Town of Paradise is working with the State Water Resources Control Board to maximize potential funding which could contribute to the construction of the Paradise Sewer Project.

As a component of the application process for this funding opportunity, the Town is required to adopt a resolution designating authority to sign and submit the application.

Financial Impact:

There are no financial impacts associated with this specific action requested. Project funding is addressed separately through various Council Actions and various funding sources. 1784

TOWN OF PARADISE
RESOLUTION NO. 2022-

A RESOLUTION AUTHORIZING A FINANCIAL ASSISTANCE APPLICATION TO THE STATE WATER

RESOURCES CONTROL BOARD FOR THE PARADISE SEWER PROJECT AND DESIGNATING THE TOWN

MANAGER OR DESIGNEE TO SIGN AND SUBMIT THE APPLICATION
WHEREAS, the Town desires to finance the costs of constructing and/or reconstructing certain public facilities and improvements relating to its wastewater system, including the Paradise Sewer Project (“Project”); and
WHEREAS, the Town intends to finance the construction and/or reconstruction of the Project or portions of the Project with moneys ("Project Funds") provided by the State of California, acting by and through the State Water Resources Control Board ("State Water Board"); and WHEREAS, the State Water Board may fund the Project Funds with proceeds from the sale of obligations, the interest upon which is excluded from gross income for federal income tax purposes (the "Obligations"); and
WHEREAS, prior to either the issuance of the Obligations or the approval by the State Water Board of the Project Funds, the Town desires to incur certain capital expenditures (the "Expenditures") with respect to the Project from available moneys of the Town.

NOW, THEREFORE, BE IT resolved by the Town Council of the Town of Paradise, as follows that:

1. The above recitals are true and correct.

2. The TOWN MANAGER (“Authorized Representative”) or designee is hereby authorized and directed to sign and file, for and on behalf of the Town, a Financial Assistance Application for a financing agreement from the State Water Resources Control Board for the planning, design, and construction of the Paradise Sewer Project.

3. This Authorized Representative, or designee, is designated to provide the assurances, certifications, and commitments required for the financial assistance application, including executing a financial assistance agreement from the State Water Board and any amendments or changes thereto.

4. The Authorized Representative, or designee, is designated to represent the Town in carrying out the Town’s responsibilities under the financing agreement, including certifying disbursement requests on behalf of the Town and compliance with applicable state and federal laws.

PASSED, APPROVED AND ADOPTED at a Regular Meeting of the Town Council of the Town of Paradise on the 7th day of November, 2022, by the following vote, to with:

AYES:

NOES:

ABSENT:

NOT VOTING:
1785
__________________________
Steve Crowder, Mayor
ATTEST:
____________________________
Dina Volenski, CMC, Town Clerk
APPROVED AS TO FORM:
____________________________
Scott E. Huber, Town Attorney
1786

Town of Paradise
Council Agenda Summary
Date: November 7, 2022
Agenda Item: 6(b)
ORIGINATED BY: Marc Mattox, Public Works Director/Town Engineer REVIEWED BY: Kevin Phillips, Town Manager
SUBJECT: CDBG-DR Infrastructure Authorizing Resolution

LONG TERM
RECOVERY PLAN:

Yes.

COUNCIL ACTION REQUESTED:

1. Consider adopting Resolution No. 2022-__ , “A Resolution of the Town Council of the Town of Paradise Authorizing and Approving Execution of a Grant Agreement to Receive an Allocation of Funding from the 2018 CDBG-DR Infrastructure Program and any Forthcoming Amendments, Thereto.”
Background:

On January 27, 2020, United States Department of Housing and Urban Development (HUD) published Federal Register Notice 85 FR 4681 allocating $1,017,399,000 in CDBG-DR funding, related to the Federal Emergency Management Agency (FEMA) Major Disaster Declarations DR4382 from July to September 2018 and DR-4407 in November 2018. The California Department of Housing and Community Development (HCD) is the grantee responsible for administering the CDBG-DR funds allocated to the State of California. CDBG-DR supports the State of California’s unmet recovery needs related to the Federal Emergency Management Agency (FEMA) Major Disaster Declarations DR- 4382 from July to September 2018 and DR-4407 in November 2018.

Recognizing unmet infrastructure recovery needs, related to DR-4382 from July to September 2018 and DR-4407 in November 2018, HCD allocated $317,428,488 of the CDBG-DR funding to the Disaster Recovery Infrastructure Program (DR-Infrastructure). DR-Infrastructure projects are funded to assist with meeting the unmet infrastructure needs of local communities. This program provides funding for FEMA Public Assistance (PA) match projects, FEMA Hazard Mitigation Grant Program (HMGP) match projects, other non-FEMA match projects, and stand-alone projects identified by local communities impacted by DR-4382 or DR-4407.

On February 8, 2022, Paradise Town Council adopted Resolution No. 2022-12, a resolution of the Town Council of the Town of Paradise declaring certain projects critical to Camp Fire recovery with unfunded needs for consideration in the CDBG-DR Infrastructure Program (DR-4407).

On August 19, 2022, the Town of Paradise was formally notified by California Housing and Community Development that of the $317M made available for allocations, the Town would be recipients of $199,592,735.75 for implementation of identified projects in the program.

In addition, the Town of Paradise was formally notified by California Housing and Community Development than an additional $30,000,000 would be allocated to the Town of Paradise for the purposes of the design and engineering phase of the Paradise Sewer Project. 1787
On September 15, 2022, The Town of Paradise Town Council approved a proposed Action Plan for the allocation of funding received through the CDBG-DR Infrastructure Program.

On October 11, 2022, the Town of Paradise adopted a specific resolution relating to the $199,592,735.75 allocation for various infrastructure projects.

Analysis:

As a component of the administration of CDBG-DR Infrastructure funding, the Town of Paradise is required to adopt a second resolution for specific items including designation of authorized staff to enter into, execute, and deliver agreements and any and all subsequent amendments, thereto, with the State of California – relating to the Paradise Sewer Project specific $30,000,000 allocation.

Financial Impact:

There are no new financial impacts associated with this action item. 1788

1 TOWN OF PARADISE
RESOLUTION NO. 2022-_____

A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF PARADISE

AUTHORIZING AND APPROVING EXECUTION OF A GRANT AGREEMENT TO RECEIVE AN ALLOCATION OF FUNDING FROM THE 2018 CDBG-DR

INFRASTRUCTURE PROGRAM AND ANY FORTHCOMING AMENDMENTS,

THERETO
BE IT RESOLVED by the Town Council of the Town of Paradise as follows:

SECTION 1:

The Town Council of the Town of Paradise has reviewed the State of California’s CDBGDR Action Plan for 2018 disasters and, hereby, approves the execution of a Standard Agreement between Town of Paradise (“Subrecipient”) and the California Department of Housing and Community Development (“HCD”), allocating to the Subrecipient the aggregate amount, not to exceed, $30,000,000 (“Grant”) for design and engineering work relative to the Paradise Sewer Project, a new in-ground wastewater collection and export system to serve the Sewer Service Area of the Town of Paradise.

The Town Council agrees to perform infrastructure-development-related activities, as further detailed in the Standard Agreement and consistent with the applicable Disaster Recovery Infrastructure Program (DR-Infrastructure) Policies and Procedures, as the same may be amended from time to time.

SECTION 2:

The Town Council hereby authorizes and directs the Town Manager or designee, Public Works Director/Town Engineer, to enter into, execute, and deliver the Standard Agreement and any and all subsequent amendments, thereto, with the State of California for the purposes of the Grant.

SECTION 3:

The Town Manager or designee, Public Works Director/Town Engineer, is authorized to execute and deliver all project applications and any and all related documentation required to effectuate the terms of the Standard Agreement, and to act on the Town’s behalf in all matters pertaining to all such applications and documentation, thereof.

SECTION 4:

If an application is approved, the Town Manager or designee, Public Works Director/Town Engineer, is authorized to enter into, execute, and deliver all Notice(s) to Proceed, and 1789

2 any and all subsequent amendments, thereto, with the State of California for the purposes of the Grant.

SECTION 5:

If an application is approved, the Town Manager or designee, Public Works Director/Town Engineer, is authorized to sign and submit Funds Requests and all required reporting forms and other documentation as may be required by the State of California, from time to time, in connection with the Standard Agreement for purposes of the Grant.

PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Paradise held on November 7, 2022 by the following vote:

AYES:

NOES:

ABSENT:

NOT VOTING:
__________________________
Steve Crowder, Mayor
ATTEST:
____________________________
Dina Volenski, CMC, Town Clerk
APPROVED AS TO FORM:
____________________________
Scott E. Huber, Town Attorney
1790

3 STATE OF CALIFORNIA
Town of Paradise
I, Dina Volenski, Town Clerk of the Town of Paradise, State of California, hereby certify the above and foregoing to be a full, true and correct copy of a resolution adopted at a duly noticed and convened meeting of said Town Council on November 7, 2022, and that such resolution has not been amended, modified, repealed or rescinded since its date of adoption and is in full force and effect as of the date hereof. __________________________________________
Dina Volenski, Town Clerk of the Town of Paradise,
State of California

By: _____________________________________
Name and Title*
1791

Town of Paradise
Council Agenda Summary
Date: November 7, 2022
Agenda Item: 6(c)
ORIGINATED BY: Ross Gilb, Finance Director / Town Treasurer REVIEWED BY: Kevin Phillips, Town Manager
SUBJECT: FY 2022-23 Operating and Capital Budget Update COUNCIL ACTION REQUESTED:

1. After presentation, review and file the financial information provided by staff concerning the FY 2022-23 operating and capital budgets; and

2. Approve staff recommended budget adjustments. (ROLL CALL VOTE) Background:

The fiscal year (FY) 2022-23 operating and capital budgets were adopted July 12, 2022. The General Fund was adopted with a balanced budget, which was achieved through a transfer from the PG&E Settlement funds to compensate for revenue shortfalls resulting from the 2018 Camp Fire. During the September 13, September 15, and October 11, 2022 Town Council Meetings, Council approved additional expenditures relating to the restoration of dispatch services project (CIP #7324), the Category 4 Tree Removal program (CIP #7312), various capital projects relating to CDBG-DR Infrastructure funding, and additional public works department positions.

Currently, about four months of transactions have been recorded for the current fiscal year.

Revenues and expenditures from the beginning of FY 2022-23 through the end of October 2022 have been recorded and reviewed in preparation of the analysis below. Staff will continue to closely monitor costs and prepare recommended budget updates regularly to keep the Town Council and community apprised of any significant changes.

Analysis:

A complete budget performance report is attached for detail review, which contains unaudited actual figures for FY 2021-22, the adopted budget for FY 2022-23, the currently amended budget for FY 2022-23 including amendments approved by Council during meetings from the beginning of the fiscal year through October 11, 2022, actual revenues and expenditures to date, proposed budget amendments by general ledger account, and the proposed amended budget for FY 2022-

23. The most significant developments are described in detail for each major fund below.

Additionally, all recommended budget adjustments have been summarized in the attached Adjustment Summary document as well as listed in detail for each fund affected in the attached Budget Worksheet Report.
1792
General Fund (1010):

Revenues:

Property Tax and Sales Tax
Property tax and sales tax revenues make up the majority of the Town’s General Fund revenue budget. The Town has yet to receive any significant property tax or sales tax revenue allocations for the current fiscal year as of the end of the October 2022. Initial allocations are expected to be received for analysis during the mid-year budget review.

Transient Occupancy Tax
The total budgeted amount of Transient Occupancy Taxes expected to be received during FY 2022-23 is $200,000. This budget is based on actual receipts of $225,000 during the prior fiscal year. Currently, there are two facilities remitting transient occupancy taxes within the Town limits.

USDA Revenues
During the first quarter of FY 2022/23, the Town was notified of the availability of grant funding through the United States Department of Agriculture (USDA) that would provide up to 60% of the total purchase price of much needed vehicles and equipment for the Town of Paradise. Town staff worked with the USDA to apply for funding to be applied toward the purchase of a new Street Sweeper (estimated purchase price of $300,000), a Community Services Officer truck and related upfit (estimated purchase price of $75,000), and three Ford Rangers (estimated purchase price of $37,000 each) for the Fire Inspector, Code Enforcement Officer, and Construction Inspector positions. The Town was subsequently awarded a grant of $260,000 based on 60% of the originally estimated purchase price of these vehicles and equipment.

The local share of $144,000 for the Street Sweeper is recommended to be funded through the use of Measure V reserves, as described in the applicable expenditure section of the agenda summary below. The cost of the local share of the other vehicles included under this grant were included in the originally adopted budget for FY 2022-23. However, since the time of budget development, the total cost of the vehicle purchases has increased a total of $22,700 for the combined equipment purchases. The additional expenditures have been included as a proposed budget adjustment within the Police and Public Works General Fund departmental budgets. As the Town was able to secure a greater amount of grant funding through the USDA than originally expected at the time of budget development, the proposed additional expenditures are offset by increases to budgeted USDA revenues based on the total amount of the grant award. As such, there is no General Fund impact as a result of the proposed amendments.

Expenditures:

Overall, General Fund expenditures are within revised budgeted expectations for the first four months of the fiscal year.

As mentioned above, during the September 13, September 15, and October 11, 2022 Town Council Meetings, Council approved additional expenditures relating to the restoration of dispatch services project (CIP #7324), the Category 4 Tree Removal program (CIP #7312), various capital projects relating to CDBG-DR Infrastructure funding, and additional public works department positions. The total projected General Fund impact of these approved expenditures for FY 2022- 23 is $145,870. These additional General Fund financial impacts related to the General Fund 1793
portion of costs for the Public Works positions approved during the September 15, 2022 Council meeting ($90,870), the purchase of workstations and equipment for the newly approved Public Works positions ($20,000), and the purchase of a new Ford Ranger for the newly approved Construction Inspector position ($35,000). These additional costs are included in the amended budget column of the summaries below.

In addition to these previously approved expenditures, staff has identified a net $100,500 of recommended additional General Fund expenditures for FY 2022-23 (excluding Measure V), the majority of which are offset by the additional unbudgeted revenues recognized above.

Additionally, staff has identified $144,000 of recommended expenditures to be funded through Measure V reserves.

The recommended changes by department are summarized in the chart below. A detailed description of each change by department is also provided.

Description
2021/22
Unaudited
Acutal
2022/23
Adopted
Budget
2022/23
Amended
Budget
2022/23
Actual
to Date
2022/23
Proposed
Adjustments
2022/23
Proposed
Budget
Non Departmental $ 1,323,274 $ 1,734,773 $ 1,734,773 $ 6,879 $ - $ 1,734,773 Town Council 36,066 37,600 37,600 11,757 - 37,600
Town Clerk 257,213 334,531 334,531 105,121 - 334,531
Town Manager 294,433 370,179 370,179 123,689 - 370,179
Central Services 593,519 665,138 665,138 442,820 12,700 677,838 Information Technology 95,838 - - - - -
HR & Risk Management 210,709 226,733 226,733 72,845 - 226,733 Legal Services 156,559 203,110 203,110 5,133 - 203,110
Finance 293,384 309,762 309,762 83,181 2,150 311,912
Police 5,405,275 6,118,298 6,118,298 2,477,628 12,500 6,130,798 Fire 4,511,280 5,857,303 5,857,303 1,039,325 - 5,857,303 Community Development 586,049 1,469,713 1,469,713 182,375 - 1,469,713 Public Works 1,212,520 1,226,280 1,567,150 404,957 73,150 1,640,300 Subtotal 14,976,118 18,553,420 18,894,290 4,955,709 100,500 18,994,790 Measure V 1,183,046 1,510,994 1,510,994 313,643 144,000 1,654,994 Grand Total $ 16,159,164 $ 20,064,414 $ 20,405,284 $ 5,269,352 $ 244,500 $ 20,649,784

TOWN OF PARADISE
General Fund Expenditure Summary by Division
Fiscal Year 2022/23 Budget
Measure V:
o $144,000 Increase: As mentioned above, during the first quarter of FY 2022-23, the Town was awarded grant funding through the USDA that would provide up to 60% of the total purchase price of much needed equipment for the Town of Paradise. A portion of the grant for which the Town was awarded was to be applied toward the purchase of a new Street Sweeper to assist with street clean up during ongoing road construction efforts. The total amount of the grant relating to the street sweeper purchase was $156,000 based on 60% of the originally estimated purchase price of $260,000. Due to inflationary pressures since the time of grant award, the quoted purchase price of the street sweeper has increased to $300,000. As such, the proposed budget adjustment for FY 2022-23 includes the total local match requirement of $144,000 in order to leverage the grant funding available through USDA and secure current pricing for this much-needed equipment. The proposed budget adjustment would increase the total budgeted expenditures for FY 2022-23 from $1,510,994 to $1,654,994. This would reduce the projected Measure V reserves as of the end of FY 2022/23 from approximately $917,000 to $773,000. o The proposed amendment and revised budget for the purchase of the Street Sweeper, as described above, was presented to, and approved by the Measure V Citizen Oversight Committee on October 25, 2022.
1794
Town Manager:
o $0 Net Impact: Based on review of financial activity within the departmental budget, $4,000 of the total funds originally budgeted towards the replacement of departmental equipment are proposed to be reclassified toward employee development and costs related to Town-wide meetings based on anticipated need for the remainder of the fiscal year.

Central Services
o $10,000 Increase: The actual cost of insurance premiums in the amount of approximately $298,000 relating primarily to general liability, mobile equipment and property coverage was approximately $10,000 greater than the budgeted premium of $289,000. o $2,700 Increase: The Town’s apportioned share of LAFCO operating expenses for the fiscal year was approximately $2,700 greater than originally anticipated at the time of budget development.

Finance
o $2,150 Increase: During the first quarter of the fiscal year, staff identified the urgent need for replacement of the fireproof filing cabinet used by the Finance and other administrative departments for storage of deposits and confidential information. The replacement was not originally included in the adopted departmental budget; however, the old cabinet was no longer functional, and the new cabinet is expected to serve the Town for years to come.

Police Department
o $0 Net Impact: Based on direction provided by Council during the prior fiscal year, Town staff has been actively involved in restoring dispatch services to the Town. The originally adopted budget included salaries and benefits for two public safety dispatcher positions for the full fiscal year. Staff continues to work towards recruitment efforts, however as of the time of budget review, neither of the two public safety dispatcher positions have been filled. The lack of expenditures relating to salaries and benefits for these two positions has created budget savings for the first quarter of the fiscal year. A budget adjustment of $10,500 is recommended to provide funds for advertising and ongoing recruitment efforts for these positions. The proposed additional expenditures are offset by savings related to salaries and benefits described above.

Public Works Engineering
o $0 Net Impact: The repairs of traffic loops at two locations throughout Town were needed due to damages incurred. The cost of the repairs totaled $22,950 and will be reimbursed by the parties responsible for the damages. A budget amendment for the expenditures and related reimbursement revenues has been included for proper tracking of financial activity.

Facilities
o $40,000 Increase: The cost of services for the removal of green waste from Town-owned properties has been identified as ongoing need based on continued annual clean up requirements. The recommended amendment of $40,000 is based on the anticipated annual cost for all Town-owned properties.
1795
General Fund Fiscal Impact and Fund Summary:

The total recommended General Fund budget amendments includes $244,500 of net additional expenditures, which is offset by $56,450 of additional revenues. This leaves a total of $188,050 of additional funding requirements. In order to balance the General Fund budget, an additional transfer from the PG&E Settlement Fund in the amount of $44,050 is recommended as well as a draw-down of Measure V reserves in the amount of $144,000. This additional recommended transfer amount brings the total proposed budgeted transfer from the settlement funds to $11,175,297 for the full fiscal year. The Fiscal Sustainability Model has been updated based on this amended transfer amount to ensure ongoing fiscal sustainability based on a medium growth scenario. The details of the updates to the Fiscal Sustainability Model have been included below.

A General Fund and PG&E Settlement Fund budget summary is also included below which presents the beginning fund balances, original and amended budget figures, and summarized actual results to date. A full detail of all figures presented below is included in the attached Budget Worksheet Reports.

Description
2021/22
Unaudited
Acutal
2022/23
Adopted
Budget
2022/23
Amended
Budget
2022/23
Actual
to Date
2022/23
Proposed
Adjustments
2022/23
Proposed
Budget
Beginning Fund Balance
GF (excluding Measure V) 2,265,760 2,265,760 2,265,760 2,265,760 2,265,760 Measure V 1,672,024 1,790,220 1,790,220 1,790,220 1,790,220 Measure V (encumbrances) (364,694) (562,162) (562,162) (562,162) (562,162) Total 3,573,090 3,493,818 3,493,818 3,493,818 3,493,818 GF Revenues 7,694,514 5,751,853 5,751,853 265,970 22,950 5,774,803 GF Transfers In 7,283,123 12,801,567 13,142,437 4,689,739 77,550 13,219,987 GF Expenditures / Transfers Out (excluding Measure V) 14,977,637 18,553,420 18,894,290 4,955,709 100,500 18,994,790 GF Net Income (Expense) - - - - - -
Measure V Revenues 1,299,723 1,200,000 1,200,000 93,391 - 1,200,000 Measure V Expenditures 1,181,527 1,510,994 1,510,994 313,643 144,000 1,654,994 Measure V Net Income (Expense) 118,196 (310,994) (310,994) (220,252) (144,000) (454,994) Ending Fund Balance
GF (excluding Measure V) 2,265,760 2,265,760 2,265,760 2,265,760 2,265,760 Measure V 1,790,220 1,479,226 1,479,226 1,569,968 1,335,226 Measure V (encumbrances) (562,162) (562,162) (562,162) (549,775) (562,162) Total 3,493,818 3,182,824 3,182,824 3,285,953 3,038,824 PGE Settlement Fund
Beginning Fund Balance 220,091,398 214,971,613 214,971,613 214,971,613 214,971,613 Revenues 959,687 1,100,000 1,100,000 269,477 2,227,843 3,327,843 Expenditures / Transfers Out 6,079,472 11,069,377 11,215,247 4,694,987 44,050 11,259,297 Ending Fund Balance 214,971,613 205,002,236 204,856,366 210,546,103 2,183,793 207,040,159

TOWN OF PARADISE
General Fund (GF) Summary
Fiscal Year 2022/23 Budget
General Fund Long Term Fiscal Sustainability Model Impact:

The originally adopted budget for FY 2022-23 included a transfer from the PG&E Fund to the General Fund totaling $10,985,377. The originally budgeted transfer amount maintained an ending reserve balance of the PGE Settlement Fund of $205,002,236 as of the end of FY 2022-

23. Based on the fiscal sustainability model projections from the FY 2022-23 adopted budget, the amount of the original settlement amount reserved for use toward operational costs (~$200 million) remaining as of the end of the 25-year projection period is projected to be $64 million, as shown in the charts below.
1796
The amendments to the originally adopted budget that were approved by Council during the September 13, 2022, September 15, 2022, and October 11, 2022 Council meetings increased the total projected General Fund expenditures for FY 2022-23 by $145,870. These additional General Fund financial impacts related to the General Fund portion of costs for the Public Works positions approved during the September 15, 2022 Council meeting ($90,870), the purchase of workstations and equipment for the newly approved Public Works positions ($20,000), and the purchase of a new Ford Ranger for the newly approved Construction Inspector position ($35,000), as described above. These General Fund impacts increased the revised estimated total projected transfer needed from the PG&E Fund to balance the General Fund to $11,131,247. This increase to the budgeted transfer from the PG&E Fund reduced the estimated balance of the PG&E Fund at the end of FY 2022-23 to $204,856,366.

The costs related to the additional public works positions are the only costs that would be expected to be recurring, while the remainder of the costs would be expected to be one-time, nonrecurring expenditures for the current fiscal year. Based on the updated fiscal sustainability model projections from the recurring costs incorporated into the FY 2022-23 amended budget, the amount of the original settlement amount reserved for use toward operational costs (~$200 million) remaining as of the end of the 25-year projection period after is projected to be approximately $2.7 million less than the original estimate based on the adopted budget, or $61.3 million.

Based on review of the actual fiscal activity compared to the amended budget through October 2022, staff has proposed net additional General Fund expenditures totaling $44,050, which would bring the revised estimated total projected transfer from the PG&E Fund required to balance the General Fund to $11,175,297.

During the first quarter of the fiscal year, the Town received reimbursement of the 1% total settlement amount that was originally held back during the settlement to pay for trailing legal costs. The amount of the reimbursement received by the Town was equal to 1% of the total settlement amount ($2,700,000) less final attorney fees ($472,157), for a net reimbursement of $2,227,843. The net effect of the additional increase to the budgeted transfer from the PG&E Fund and the trailing cost reimbursement is projected to increase the estimated balance of the PG&E Fund at the end of FY 2022-23 to $207,040,159.

Based on the further updated fiscal sustainability model projections from the recurring costs of $44,050 incorporated into the FY 2022-23 amended budget, the amount of the original settlement amount reserved for use toward operational costs (~$200 million) remaining as of the end of the 25-year projection period after is projected to be approximately $1.4 million less than the amended estimate based on the adopted budget, or $59.9 million.

However, with the receipt of the trailing costs reimbursement during the current fiscal year, the total amount of the original settlement expected to be remaining at the end of the 25-year projection period is projected to be approximately $62.4 million as shown in the charts below.

The projected balance of $62.4 million is a positive indicator of continued long-term fiscal sustainability through the period projected and provides an additional contingency reserve that can be utilized if revenue backfill is needed beyond the 25-year projection period, or in the event that rebuild activity, or other factors, varies significantly from current projections at any point in the future.
1797
Originally Adopted FY 2022-23 Budget Proposed Amended FY 2022-23 Budget

Building Safety and Wastewater Services (Fund 2030)
All revenues and expenditures relating to the Building Safety and Wastewater Services fund are within budgeted expectations for the first four months of the fiscal year. A detailed budget performance report is attached for review.

Animal Control Services (Fund 2070)
All revenues and expenditures relating to the Animal Control fund are within budgeted expectations for the first four months of the fiscal year. A detailed budget performance report is attached for review.

Camp Fire Recovery (Fund 2090)
All revenues and expenditures relating to the Camp Fire Recovery Fund are within budgeted expectations for the first four months of the fiscal year. Town staff continues to work closely with FEMA, CalOES, and insurance to recover reimbursement for infrastructure project costs related to the 2018 Camp Fire on a timely basis. A detailed budget performance report is attached for review.

COVID-19 (Fund 2095)
The original budget included $1,359,500 of approved expenditures for FY 2022-23 and projected an ending fund balance of $1,224,280 as of June 30, 2023.

During Town Council meetings held through October 11, 2022, Council approved $777,561 of total additional expenditures funded through the use of the American Rescue Plan Act (ARPA) funds. The additional expenditures included $392,561 toward the restoration of dispatch services project (CIP #7324), $90,000 toward the Category 4 Tree Removal program (CIP #7312), $195,000 toward facility repairs to Town Hall, and $100,000 toward facility repairs to Fire Station

81. The amended budget includes $2,137,061 of approved expenditures for FY 2022-23 and currently projects an ending fund balance of $446,719 as of June 30, 2023. 1798
All revenues and expenditures relating to the COVID-19 fund are within revised budgeted expectations for the first four months of the fiscal year. Revenues relating to the second disbursement for the second half of the Town’s allocation of ARPA funds are likely to be realized during the second half of the fiscal year. A detailed budget performance report is attached for review.

Capital Improvement Fund (2100)
o $250,000 Increase: On June 14, 2022 Paradise Town Council declared an emergency to repair or replace the culvert on Stearns Road in the vicinity of the Dry Creek drainage and to make related repairs to the roadway (CIP/DR Project #9418). Since the declaration, Town staff has bid the project, contracted the work, and completed the project of replacing the culvert. Town Council accepted the completed project on October 11, 2022. The $250,000 proposed maximum project cost is based on the maximum estimated project cost for project engineering and construction. All project costs are expected to be funded through local drainage funds, which would result in no additional General Fund impacts. o $100,000 Increase: Additional funds in the amount of $100,000 have been identified as needed towards the completion of the Pentz Pathway Phase 2 (CIP/DR Project #9389).

The original budget estimate included in the CIP/DR plan for FY 2022-23 was $187,450, which was budgeted to be funded through the use of Federal Congestion Mitigation Air Quality funds. The additional $100,000 budget amendment is proposed to be funded through the use of the Town’s transportation funds annual allocations. o $0 Net Impact: Interim Safety Striping for various critical locations throughout Town (CIP/DR Project #9420) has been identified as a critical project proposed to be completed during the current fiscal year. This project is proposed to be funded through the use of transportation funds originally allocated towards the Town’s CDBG Sidewalk Improvements 2022 project (CIP/DR Project #9417). As presented during the October 11, 2022 Council meeting, cost savings are expected to be realized on the CDBG Sidewalk project that would allow for the reallocation of up to $300,000 in additional funds towards other transportation related projects.
o $60,000 Correction: A project to update the Town’s pavement management program software was included under the adopted FY 2022-23 Capital Improvement Plan (CIP/DR Project #9416), which was planned to be funded through use of Gas Tax Funds. The budgeted line item for these costs was inadvertently excluded from the Gas Tax budget and is recommended to be included under the Gas Tax Fund (GL 2120.45.4750.5910.100) to ensure the Town-wide budget document matches the CIP/DR budget. As the entirety of this project was planned to be funded through the use of Gas Tax fund, there is no General Fund financial impact as a result of this adjustment. o All other revenues and expenditures relating to the Capital Improvement fund are within budgeted expectations for the first four months of the fiscal year. Revenues are likely to be realized later in the fiscal year as reimbursement requests are completed for costs incurred during the fiscal year. A detailed budget performance report is attached for review.

Significant expenditures for the first four months of the fiscal year include:
o 9394 Downtown Sewer Environmental Survey: $ 348,969
o 9377 Almond Multi-Modal Improvements: $ 238,093
o 9385 Paradise Gap Closure Project: $ 191,695
o 9418 Stearns Road Culvert Replacement $ 159,819
o 9390 Skyway-Neal Bike-Ped Project $ 41,952
1799
Disaster Recovery Fund (2105)
All revenues and expenditures relating to the Disaster Recovery fund are within budgeted expectations for the first four months of the fiscal year. Revenues are likely to be realized later in the fiscal year as reimbursement requests are completed for costs incurred during the fiscal year.

A detailed budget performance report is attached for review.

Significant expenditures for the first four months of the fiscal year include:
o 7303 On System Road Rehabilitation: $2,683,586
o 7324 Restoration of Dispatch Services: $ 180,044
o 7312 Category 4 Tree Removal: $ 119,137
o 7320 SWRCB Septic Grant $ 98,937
o 7309 Transportation Master Plan $ 60,365
Gas Tax / Street Maintenance (Fund 2120)
All revenues and expenditures relating to the Gas Tax fund are within budgeted expectations for the first four months of the fiscal year. A detailed budget performance report is attached for review.

Business and Housing (Fund 2160)
All revenues and expenditures relating to the Business and Housing fund are within budgeted expectations for the first four months of the fiscal year. A detailed budget performance report is attached for review.

PGE Settlement Fund (7700)
o Revenues:
o The Town has received $381,490 in interest revenues for the first three months of the fiscal year, which is trending in line with total budgeted expectations of $1,100,000 for the full fiscal year. Staff continues to closely monitor revenues as securities mature and funds are reinvested into new investments under this quickly changing interest rate environment.
o As mentioned above, during the first quarter of the fiscal year, the Town received reimbursement of the 1% total settlement amount that was originally held back during the settlement to pay for trailing costs. The amount of the reimbursement received by the Town was equal to 1% of the total settlement amount ($2,700,000) less final attorney fees ($472,157), for a net reimbursement of $2,227,843. o Expenditures / Transfers Out:
o $44,050 Increase: As mentioned above, the total recommended General Fund budget amendments includes $244,500 of net additional expenditures, which is offset by $56,450 of additional revenues, and a recommended draw-down of Measure V reserves in the amount of $144,000. This leaves a total of $44,050 of additional funding requirements. In order to balance the General Fund budget, an additional transfer from the PG&E Settlement Fund in the amount of $44,050 is recommended.
1800
Conclusion:

Overall, the Town-wide financial activity for the first four months of the fiscal year is within budgeted expectations. The total impact to the General Fund of the recommended adjustments above is an additional $44,050 in expenditures, which is recommended to be offset by an additional transfer from the PG&E Settlement Funds. The amended FY 2022-23 PG&E fund total transfer amount of $11,175,297 and projected PG&E Settlement Fund balance at the end of the projection period included in the Fiscal Sustainability model ($62.4 million) is still a positive indicator of ongoing fiscal sustainability based on a medium growth scenario. Staff will continue to closely monitor financial activity against budgeted benchmarks and will bring any additional recommendations for budget amendment during the mid-year budget review process. 1801
Budget Fund (Department) Adjustment Item GL Budget Code Adjustment Description Amount General (Town Manager) Budget Reclassification - Employee Development 1010.20.4200.5223.105 Reclassification of original furniture and equipment budget for Town-wide employee development 1,000 $ Estimated Costs General (Town Manager) Budget Reclassification - Meetings 1010.20.4200.5224 Reclassification of original furniture and equipment budget for Town-wide meetings 3,000 Estimated Costs General (Town Manager) Budget Reclassification - Meetings 1010.20.4200.5304 Reclassification of original furniture and equipment budget for Town-wide meetings and employee development (4,000) Estimated Costs General (Central Services) Insurance Premium 1010.20.4201.5212.100 Increase to property insurance premium due to additional property covered during current fiscal year 10,000 Actual Costs General (Central Services) LAFCO Apportionment 1010.20.4201.5260 Increased LAFCO apportionment compared to prior year 2,700 Actual Costs General (Finance) Fireproof Filing Cabinet 1010.25.4400.5304 Replacement fire proof cabinet for Finance Department 2,150 Actual Costs General (Police Comms) Budget Reclassification - Recruitment 1010.30.4530.5218.100 Reclassification of savings in salaries and benefits budget for recruitment efforts relating to Dispatcher positions 10,500 Actual Costs General (Police Comms) Budget Reclassification - Recruitment 1010.30.4530.5101 Reclassification of savings in salaries and benefits budget for recruitment efforts relating to Dispatcher positions (10,500) Actual Costs General (PW Engineering) Encroachment Permit Fees 1010.45.4740.3402.270 Clark & Nunnely and Clark & Elliot repairs to traffic loops - reimbursed by PG&E (22,950) Actual Costs General (PW Engineering) Traffic Loop Repairs 1010.45.4740.5214.100 Clark & Nunnely and Clark & Elliot repairs to traffic loops - reimbursed by PG&E 22,950 Actual Costs General (Facilities) Property Maintenance 1010.45.4747.5211.136 Hauling services related to clearing of green waste from Town properties 40,000 Estimated Costs General (Police) Community Services Officer Truck & Upfit 1010.30.4520.5305 Additional cost above original budget for Community Services Officer Truck & Upfit - Offset by Additional USDA Grant Revenues 12,500 Quoted Costs General (PW Engineering) Construction Inspector Ford Ranger (x2) 1010.45.4740.5305 Additional cost above original budget for Construction Inspector Vehicle - Offset by Additional USDA Grant Revenues 10,200 Quoted Costs General (Revenues) USDA Equipment Grant 2022 1010.00.0000.3910.138 Transfer in to General Fund from USDA Fund for award of Grant from USDA (33,500) Quoted Costs USDA USDA Equipment Grant 2022 2138.00.0000.3310.099 USDA Fund Revenue for Equipment/Vehicle Grant Award (33,500) Quoted Costs USDA USDA Equipment Grant 2022 2138.00.0000.5910.010 Transfer out from USDA Fund to General Fund for award of Grant from USDA 33,500 Quoted Costs General (Revenues) Transfer in from PGE Fund 1010.00.0000.3910.700 Additional transfer from PG&E Fund related to proposed adjustments (44,050) Total proposed GF adjustments PGE Fund Transfer out to General Fund 7700.00.0000.5910.010 Additional transfer from PG&E Fund related to proposed adjustments 44,050 Total proposed GF adjustments General (Measure V) Street Sweeper Local Share 1010.25.4420.350.5910.100 Transfer out of General Fund (Measure V) to Gas Tax Fund for Public Works street sweeper - net of $156,000 USDA Grant 144,000 Quoted Costs Gas Tax Street Sweeper Local Share 2120.45.4750.3910.010 Transfer in to Gas Tax Fund from General Fund (Measure V) for Public Works street sweeper - net of $156,000 USDA Grant (144,000) Quoted Costs Gas Tax Street Sweeper Total Cost 2120.45.4750.5305 Public Works street sweeper - total cost of asset purchase 300,000 Quoted Costs Gas Tax Street Sweeper USDA Share 2120.45.4750.3910.138 Transfer in to Gas Tax Fund from USDA Fund for Public Works street sweeper - portion of total cost covered through USDA Grant award (156,000) Quoted Costs USDA Street Sweeper USDA Share 2138.00.0000.3310.099 USDA Fund Revenue for Public Works street sweeper - portion of total cost covered through USDA Grant award of $156,000 (156,000) Quoted Costs USDA Street Sweeper USDA Share 2138.00.0000.5910.120 Transfer out of USDA Fund to Gas Tax Fund for Public Works street sweeper - portion of total cost covered through USDA Grant award 156,000 Quoted Costs ARPA (Facilities) Reclassification - Town Hall Facilities Improvements 1010.45.4747.5214.100 Move budget from Repair/Maintenance Services to Improvements account (200,000) Adjusting expense account ARPA (Facilities) Reclassification - Town Hall Facilities Improvements 1010.45.4747.5303 Move budget from Repair/Maintenance Services to Improvements account 200,000 Adjusting expense account ARPA (FD) Reclassification - Fire Station 81 Facilities Improvements 2095.35.4610.595.5214.100 Move budget from Repair/Maintenance Services to Improvements account (250,000) Adjusting expense account ARPA (FD) Reclassification - Fire Station 81 Facilities Improvements 2095.35.4610.595.5303 Move budget from Repair/Maintenance Services to Improvements account 250,000 Adjusting expense account General (Measure V) Reclassification - Fire Station 81 Facilities Improvements 1010.25.4420.326.5304 Move budget from Suppression to Admin and from Furniture/Equip. to Improvements account (50,000) Adjusting expense account General (Measure V) Reclassification - Fire Station 81 Facilities Improvements 1010.25.4420.325.5303 Move budget from Suppression to Admin and from Furniture/Equip. to Improvements account 50,000 Adjusting expense account CIP / DR 9416 Pavement Mgmt. Program Update 2022 2120.45.4750.5910.100 Transfer out from Gas Tax to Capital Projects Fund for $60k included in CIP/DR spreadsheet but not in Gas Tax budget in original draft 60,000 Original CIP / DR Budget CIP / DR 9416 Pavement Mgmt. Program Update 2022 2100.50.8901.3910.120 Transfer out from Gas Tax to Capital Projects Fund for $60k included in CIP/DR spreadsheet but not in Gas Tax budget in original draft (60,000) Original CIP / DR Budget CIP / DR 9416 Pavement Mgmt. Program Update 2022 2100.50.8901.9416 Transfer out from Gas Tax to Capital Projects Fund for $60k included in CIP/DR spreadsheet but not in Gas Tax budget in original draft 60,000 Original CIP / DR Budget CIP / DR 9418 Stearns Road Emergency Culvert Replacement 2100.50.8901.9418 Estimated total Project costs ($50k PE/$200k construction) 250,000 Estimated Costs CIP / DR 9418 Stearns Road Emergency Culvert Replacement 2100.50.8901.3910.551 Transfer in to Capital Projects Fund from Impact Fees Drainage Fund (250,000) Estimated Costs CIP / DR 9418 Stearns Road Emergency Culvert Replacement 2551.45.0000.5910.100 Transfer out of Impact Fees Drainage Fund to Capital Projects Fund 250,000 Estimated Costs CIP / DR 9389 Pentz Pathway Phase 2 2100.50.8901.9389 Additional project cost expected for FY 2022-23 100,000 Estimated Costs CIP / DR 9389 Pentz Pathway Phase 2 2100.50.8901.3910.110 Transfer in from Transportation Fund (100,000) Estimated Costs CIP / DR 9389 Pentz Pathway Phase 2 2110.45.4743.5910.100 Transfer out to Capital Project Fund 100,000 Estimated Costs CIP / DR 9389 Pentz Pathway Phase 2 2110.00.0000.3345.001 Additional transportation fund revenue for additional drawdown expected (100,000) Estimated Costs CIP / DR 9417 CDBG Sidewalk Improvements 2022 2100.50.8901.9417 Reallocation of available funding from underbudget CDBG Sidewalk Improvements project to Interim Safety Striping project (105,000) Estimated Costs CIP / DR 9420 Interim Safety Striping 2022 2100.50.8901.9420 Reallocation of available funding from underbudget CDBG Sidewalk Improvements project to Interim Safety Striping project 105,000 Estimated Costs PGE Fund Receipt of Trailing Costs 7700.00.0000.3901.100 Receipt of 1% Trailing Costs from Total Settlement (2,227,843) $ Actual Receipt $ (1,729,793) Total Financial Impact
$ General Fund (Non-Measure V) 44,050
$ General Fund (Measure V) 144,000
$ Gas Tax Fund 60,000
$ Impact Fees Drainage Fund 250,000
$ PG&E Settlement Fund (2,227,843)
Financial Impact Fund Distribution
Adjustment Summary: November 7, 2022
1802
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.00.0000.3110.311 Property Tax Current Secured 2,368,023 2,340,000 2,340,000 - - 2,340,000 1010.00.0000.3110.312 Property Tax Current Unsecured 107,575 116,500 116,500 - - 116,500 1010.00.0000.3110.315 Property Tax Prior Secured/Unsecured 3,254 5,000 5,000 - - 5,000 1010.00.0000.3110.320 Property Tax General Supplemental 43,459 40,000 40,000 - - 40,000 1010.00.0000.3130.325 General Sales and Use Tax Sales and Use Tax 1,198,929 1,000,000 1,000,000 69,832 - 1,000,000 1010.00.0000.3167.330 Real Property Transfer Tax Real Property Transfer Tax 101,168 85,000 85,000 23,675 - 85,000 1010.00.0000.3182.335 Franchise Taxes Franchise Taxes 386,817 347,000 347,000 - - 347,000 1010.00.0000.3185.340 Transient Occupancy Tax Transient Occupancy Tax 225,722 200,000 200,000 - - 200,000 1010.00.0000.3210.110 Business Licenses and Permits Business Regulation 9,133 7,500 7,500 2,575 - 7,500 1010.00.0000.3210.120 Business Licenses and Permits Bingo Regulation 42 - - - - - 1010.00.0000.3215.100 DOJ/FBI Fees Fingerprinting/Processing (2,271) - - (1,016) - - 1010.00.0000.3351.001 Property Tax Homeowners Apportionment 22,404 15,000 15,000 - - 15,000 1010.00.0000.3356.001 State Motor Vehicle In Lieu Motor Vehicle In Lieu Tax 1,067,604 1,097,000 1,097,000 - - 1,097,000 1010.00.0000.3410.104 Administrative Services Returned Check Processing 307 150 150 26 - 150 1010.00.0000.3410.107 Administrative Services Electronic Audio Reproduction 12 - - - - - 1010.00.0000.3410.113 Administrative Services Document Copying 138 50 50 3 - 50 1010.00.0000.3410.114 Administrative Services Document Certification 180 150 150 120 - 150 1010.00.0000.3610.100 Interest Revenue Investments 3,283 15,000 15,000 8 - 15,000 1010.00.0000.3630.200 Rents and Royalties Billboard Rents and Leases 440 440 440 - - 440 1010.00.0000.3901.100 Refunds and Reimbursements Miscellaneous 25,740 2,000 2,000 617 - 2,000 1010.00.0000.3901.145 Refunds and Reimbursements Insurance Proceeds 1,071,088 - - - - - 1010.00.0000.3902.100 Miscellaneous Revenue General 14,189 4,000 4,000 558 - 4,000 1010.00.0000.3902.110 Miscellaneous Revenue Cash Over and Short 78 - - - - - 1010.00.0000.3910.030 Transfers In From Development Services Fund 262,686 341,836 341,836 - - 341,836 1010.00.0000.3910.070 Transfers In From Animal Control 54,357 66,344 66,344 - - 66,344 1010.00.0000.3910.090 Transfers In From Camp Fire Recovery 321,790 94,749 94,749 - - 94,749 1010.00.0000.3910.095 Transfers In From COVID-19 Fund - 102,000 297,000 - - 297,000 1010.00.0000.3910.110 Transfers In From Local Transportation Fund 5,091 7,568 7,568 - - 7,568 1010.00.0000.3910.120 Transfers In From State Gas Tax Fund 353,824 225,147 225,147 - - 225,147 1010.00.0000.3910.130 Transfers In From State Water Board Prop 1 97 - - - - - 1010.00.0000.3910.138 Transfers In From USDA Fund - 70,500 70,500 - 33,500 104,000 1010.00.0000.3910.140 Transfers In From Traffic Safety Fund 2,250 2,250 2,250 - - 2,250 1010.00.0000.3910.160 Transfers In From BHS Development Svcs Fund 76,274 73,096 73,096 - - 73,096 Fund: 1010 - General Fund

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
1803
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.00.0000.3910.215 Transfers In From Aband Vehicle Abate Fund 26,858 16,500 16,500 1,814 - 16,500 1010.00.0000.3910.628 Transfers In From Gen Plan Fee 167,510 800,000 800,000 - - 800,000 1010.00.0000.3910.650 Transfers In From Successor Agency to RDA NH 16,200 16,200 16,200 - - 16,200 1010.00.0000.3910.700 Transfers In From PG&E Settlement Fund 5,996,186 10,985,377 11,131,247 4,687,925 44,050 11,175,297 13,930,437 18,076,357 18,417,227 4,786,136 77,550 18,494,777 13,930,437 18,076,357 18,417,227 4,786,136 77,550 18,494,777 1010.25.4420.3130.326 General Sales and Use Tax Transactions and Use Tax (TUT) 1,299,723 1,200,000 1,200,000 93,391 - 1,200,000
1,299,723 1,200,000 1,200,000 93,391 - 1,200,000
1010.25.5005.3901.100 Refunds and Reimbursements Miscellaneous 528 400 400 88 - 400 528 400 400 88 - 400
1,300,250 1,200,400 1,200,400 93,479 - 1,200,400
Program Total: 5005 - Rental Properties
Department Total: 25 - Finance
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Department: 25 - Finance
Program: 4420 - Measure C/V TUT
Program Total: 4420 - Measure C/V TUT
Program: 5005 - Rental Properties
1804
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.30.0000.3320.100 Federal Revenue - Other Refunds and Reimbursements - 2,000 2,000 - - 2,000 1010.30.0000.3345.004 State Revenues - Other POST Reimbursements 858 5,000 5,000 2,474 - 5,000 1010.30.0000.3345.100 State Revenues - Other Refunds & Reimbursements 52 250 250 - - 250 1010.30.0000.3380.100 Local Government Revenue Fines and Forfeitures 24,468 15,000 15,000 2,416 - 15,000 1010.30.0000.3380.106 Local Government Revenue Administrative Citations Police 100 400 400 - - 400 1010.30.0000.3380.112 Local Government Revenue Property Room Proceeds - 400 400 - - 400 1010.30.0000.3421.100 Police Vehicle Repossession - 100 100 27 - 100 1010.30.0000.3421.105 Police Cite Sign Off / VIN Verification 305 500 500 23 - 500 1010.30.0000.3421.110 Police DUI Accident & Arrest Processing 1,057 500 500 242 - 500 1010.30.0000.3421.111 Police Vehicle Impound Fee 1,446 500 500 321 - 500 1010.30.0000.3421.115 Police Police Report (Copy) 18 10 10 7 - 10 1010.30.0000.3421.120 Police Fingerprint Processing 4,712 2,500 2,500 2,045 - 2,500 1010.30.0000.3421.122 Police Visa/Clearance Letter 31 31 31 16 - 31 1010.30.0000.3421.130 Police Reproduce/Sale of Tapes & Photos 170 50 50 57 - 50 1010.30.0000.3421.140 Police Alarm System Registration 1,531 750 750 200 - 750 1010.30.0000.3421.141 Police False Alarm Response 2,808 500 500 119 - 500 1010.30.0000.3421.180 Police Special Services - 250 250 - - 250 1010.30.0000.3421.187 Police Subpoena Duces Tecum 63 - - 31 - - 1010.30.0000.3901.100 Refunds and Reimbursements Miscellaneous 40,348 1,500 1,500 490 - 1,500 1010.30.0000.3901.140 Refunds and Reimbursements Negligence Cost Recovery Fees 989 - - - - -
1010.30.0000.3902.100 Miscellaneous Revenue General 288 100 100 330 - 100 1010.30.0000.3910.010 Transfers In From General Fund - 3,070 3,070 - - 3,070 1010.30.0000.3910.138 Transfers In From USDA Fund - 3,148 3,148 - - 3,148 79,244 36,559 36,559 8,799 - 36,559
79,244 36,559 36,559 8,799 - 36,559
1010.35.0000.3345.100 State Revenues - Other Refunds & Reimbursements 302,196 75,000 75,000 - - 75,000 1010.35.0000.3380.103 Local Government Revenue Fines and Citations Fire 36,650 - - - - - 1010.35.0000.3422.304 Fire Fuel Reduction Burn Permit 6,980 10,000 10,000 - - 10,000 1010.35.0000.3422.315 Fire Residential Burning Regulation 13,393 10,000 10,000 - - 10,000 1010.35.0000.3422.338 Fire Fire Flow/Hydrant Location 22 - - - - - 1010.35.0000.3901.100 Refunds and Reimbursements Miscellaneous - - - 52,500 - - 1010.35.0000.3902.100 Miscellaneous Revenue General 1,706 - - - - - Department: 30 - Police
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 30 - Police
Department: 35 - Fire
Program: 0000 - Non Program Activity
1805
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
360,948 95,000 95,000 52,500 - 95,000
360,948 95,000 95,000 52,500 - 95,000
1010.40.4720.3380.101 Local Government Revenue Fines and Citations Comm Develop 12,400 8,000 8,000 - - 8,000
1010.40.4720.3400.101 CDD Planning Appeals Review 104 - - - - - 1010.40.4720.3400.104 CDD Planning Tentative Parcel Map 2,074 1,754 1,754 - - 1,754 1010.40.4720.3400.109 CDD Planning Street Address Change Review - 176 176 - - 176 1010.40.4720.3400.111 CDD Planning Landscape Plan 849 1,136 1,136 283 - 1,136 1010.40.4720.3400.130 CDD Planning General Plan Amend and Rezoning - 2,907 2,907 - - 2,907 1010.40.4720.3400.139 CDD Planning Research on Request 94 94 94 - - 94 1010.40.4720.3400.170 CDD Planning Use Permit Class A 2,828 2,121 2,121 1,414 - 2,121 1010.40.4720.3400.171 CDD Planning Use Permit Class B 3,759 - - - - - 1010.40.4720.3400.173 CDD Planning Temporary Use Permit 3,991 3,000 3,000 1,265 - 3,000 1010.40.4720.3400.174 CDD Planning Administrative Permit 16,682 12,000 12,000 2,606 - 12,000 1010.40.4720.3400.178 CDD Planning Site Plan/Use Permit Mod Class B - - - 652 - - Program Total: 0000 - Non Program Activity
Department Total: 35 - Fire
Department: 40 - Community Development
Program: 4720 - CDD Planning
1806
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.40.4720.3400.184 CDD Planning Site Plan Review Class A 660 660 660 - - 660 1010.40.4720.3400.200 CDD Planning Tree Felling Permit 49 - - - - - 1010.40.4720.3400.307 CDD Planning Design Review Application 1,581 1,756 1,756 922 - 1,756 1010.40.4720.3901.100 Refunds and Reimbursements Miscellaneous - - - 435 - - 1010.40.4720.3910.628 Transfers In From Gen Plan Fee 201,178 - - - - - 246,250 33,604 33,604 7,577 - 33,604
1010.40.4780.3182.335 Franchise Taxes Franchise Taxes 15,184 15,500 15,500 - - 15,500 1010.40.4780.3380.104 Local Government Revenue Fines and Citations Waste Mgmt 100 - - - - -
15,284 15,500 15,500 - - 15,500
261,534 49,104 49,104 7,577 - 49,104
1010.45.4740.3402.201 PW Engineering Final Parcel Map - - - 1,296 - - 1010.45.4740.3402.223 PW Engineering Engineering Site Plan 1,037 1,000 1,000 - - 1,000 1010.45.4740.3402.224 PW Engineering Grading Check/Inspection 14,229 7,500 7,500 1,911 - 7,500 1010.45.4740.3402.226 PW Engineering Cert of Correction with Hearing 2,333 - - 1,462 - - 1010.45.4740.3402.227 PW Engineering Lot Merger Review 4,666 7,500 7,500 2,592 - 7,500 1010.45.4740.3402.228 PW Engineering Lot Line Adjustment 4,536 4,000 4,000 1,815 - 4,000 1010.45.4740.3402.230 PW Engineering Engineer Drain Plan/Calc Review 18,534 20,000 20,000 26 - 20,000 1010.45.4740.3402.232 PW Engineering Erosion Control Plan Review 389 - - - - - 1010.45.4740.3402.250 PW Engineering Oversized Vehicle Regulation 4,360 5,000 5,000 874 - 5,000 1010.45.4740.3402.270 PW Engineering Encroachment Permit Fees 293,133 250,000 250,000 90,634 22,950 272,950 343,218 295,000 295,000 100,609 22,950 317,950
1010.45.4745.3470.251 Parks & Recreation Space Rental 1,730 1,000 1,000 - - 1,000 1,730 1,000 1,000 - - 1,000
344,948 296,000 296,000 100,609 22,950 318,950
16,277,360 19,753,420 20,094,290 5,049,100 100,500 20,194,790 1010.00.0000.5213.100 Professional/Contract Services General 124,824 100,000 100,000 6,500 - 100,000 1010.00.0000.5225 Bank Fees and Charges 4,638 3,500 3,500 379 - 3,500 1010.00.0000.5501 Debt Service Payment - Principal 484,425 469,658 469,658 - - 469,658 1010.00.0000.5502 Debt Service Payment - Interest 640,575 685,342 685,342 - - 685,342 1010.00.0000.5910.090 Transfers Out To Camp Fire 2018 Recovery - 373,273 373,273 - - 373,273 Department Total: 40 - Community Development
Department: 45 - Public Works
Program: 4740 - Public Works - Engineering
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 4740 - Public Works - Engineering
Program: 4745 - Paradise Community Park
Program Total: 4745 - Paradise Community Park
Department Total: 45 - Public Works
REVENUES Total

EXPENSES
Program Total: 4720 - CDD Planning
Program: 4780 - CDD - Waste Management
Program Total: 4780 - CDD - Waste Management
1807
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.00.0000.5910.105 Transfers Out To Camp Fire Recovery Projects 68,812 60,000 60,000 - - 60,000 1010.00.0000.5910.650 Transfers Out To Successor Agency RDA NH - 40,500 40,500 - - 40,500 1010.00.0000.5910.923 Transfers Out To TOP Housing Loan Fund - 2,500 2,500 - - 2,500 1,323,274 1,734,773 1,734,773 6,879 - 1,734,773
1,323,274 1,734,773 1,734,773 6,879 - 1,734,773
1010.10.4000.5101 Salaries - Permanent 18,000 18,000 18,000 5,250 - 18,000 1010.10.4000.5107 Car Allowance/Mileage 5,501 5,400 5,400 1,575 - 5,400 1010.10.4000.5111 Medicare 339 339 339 99 - 339
1010.10.4000.5112.102 GASB 68 - Pension Expense Social Security 1,451 1,451 1,451 423 - 1,451 1010.10.4000.5113 Worker's Compensation 124 160 160 53 - 160 1010.10.4000.5202.100 Operating Supplies General 229 50 50 170 - 50 1010.10.4000.5213.100 Professional/Contract Services General - 475 475 - - 475 1010.10.4000.5219.100 Printing General 54 100 100 - - 100 1010.10.4000.5220.100 Employee Development General 10,267 11,625 11,625 4,187 - 11,625 1010.10.4000.5223.105 Meals and Refreshments Emergencies and Meetings 102 - - - - - 36,066 37,600 37,600 11,757 - 37,600
36,066 37,600 37,600 11,757 - 37,600
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Department: 10 - Legislative
Program: 4000 - Town Council
Program Total: 4000 - Town Council
Department Total: 10 - Legislative
1808
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.15.4100.5101 Salaries - Permanent 155,022 179,809 179,809 47,042 - 179,809 1010.15.4100.5105 Salaries - Overtime/FLSA 304 - - - - - 1010.15.4100.5106.100 Incentives & Admin Leave Administrative Leave 4,529 6,870 6,870 - - 6,870 1010.15.4100.5107 Car Allowance/Mileage - 2,400 2,400 623 - 2,400 1010.15.4100.5111 Medicare 2,207 2,742 2,742 688 - 2,742 1010.15.4100.5112.101 GASB 68 - Pension Expense PERS 33,961 37,301 37,301 24,410 - 37,301 1010.15.4100.5113 Worker's Compensation 1,124 935 935 310 - 935 1010.15.4100.5114.101 Health Insurance Medical 15,636 19,662 19,662 4,871 - 19,662 1010.15.4100.5114.102 Health Insurance Dental 1,857 - - 557 - - 1010.15.4100.5114.103 Health Insurance Vision 128 - - 38 - - 1010.15.4100.5115 Unemployment Compensation 968 - - 342 - - 1010.15.4100.5116.101 Life and Disability Insurance Life & Disab. 499 2,006 2,006 174 - 2,006 1010.15.4100.5116.102 Life and Disability Insurance Long Term/Short Term Disability 1,211 - - 395 - -
1010.15.4100.5119.100 Retiree Costs Medical Insurance 4,591 4,675 4,675 1,150 - 4,675 1010.15.4100.5201.100 Office Supplies General 247 250 250 166 - 250 1010.15.4100.5202.100 Operating Supplies General 1,225 235 235 - - 235 1010.15.4100.5204 Subscriptions and Code Books 307 350 350 - - 350 1010.15.4100.5210.100 Postage General 105 150 150 23 - 150 1010.15.4100.5213.100 Professional/Contract Services General 13,004 27,581 27,581 15,544 - 27,581 1010.15.4100.5214.100 Repair and Maint Service General 11,349 11,415 11,415 5,851 - 11,415 1010.15.4100.5215.106 Rents and Leases Copiers 708 900 900 283 - 900 1010.15.4100.5218.100 Advertising General 3,024 6,500 6,500 729 - 6,500 1010.15.4100.5219.100 Printing General 48 50 50 38 - 50 1010.15.4100.5220.100 Employee Development General 5,157 5,700 5,700 1,888 - 5,700 1010.15.4100.5221 Election-County Services - 25,000 25,000 - - 25,000 1010.15.4100.5304 Furniture & Equipment - - - - - -
257,213 334,531 334,531 105,121 - 334,531
257,213 334,531 334,531 105,121 - 334,531
1010.20.4001.5213.100 Professional/Contract Services General 17,363 - - - - - 17,363 - - - - -
1010.20.4200.5101 Salaries - Permanent 175,918 184,673 184,673 50,227 - 184,673 1010.20.4200.5106.100 Incentives & Admin Leave Administrative Leave 9,042 9,403 9,403 - - 9,403 Department: 15 - Town Clerk
Program: 4100 - Town Clerk
Program Total: 4100 - Town Clerk
Department Total: 15 - Town Clerk
Department: 20 - Administrative Services
Program: 4001 - Tourism
Program Total: 4001 - Tourism
Program: 4200 - Town Manager
1809
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.20.4200.5107 Car Allowance/Mileage 2,029 2,040 2,040 430 - 2,040 1010.20.4200.5111 Medicare 2,663 2,406 2,406 716 - 2,406 1010.20.4200.5112.101 GASB 68 - Pension Expense PERS 32,304 33,867 33,867 23,817 - 33,867 1010.20.4200.5113 Worker's Compensation 1,211 960 960 318 - 960 1010.20.4200.5114.101 Health Insurance Medical 13,519 18,320 18,320 4,400 - 18,320 1010.20.4200.5114.102 Health Insurance Dental 1,848 - - 536 - - 1010.20.4200.5114.103 Health Insurance Vision 153 - - 45 - - 1010.20.4200.5115 Unemployment Compensation 1,183 - - 356 - - 1010.20.4200.5116.101 Life and Disability Insurance Life & Disab. 459 1,305 1,305 133 - 1,305 1010.20.4200.5116.102 Life and Disability Insurance Long Term/Short Term Disability 1,813 - - 541 - -
1010.20.4200.5119.100 Retiree Costs Medical Insurance 33,946 36,318 36,318 7,781 - 36,318 1010.20.4200.5201.100 Office Supplies General 14 500 500 15 - 500 1010.20.4200.5202.100 Operating Supplies General 990 1,000 1,000 - - 1,000 1010.20.4200.5203.100 Repairs and Maint Supplies General - - - 21 - - 1010.20.4200.5210.100 Postage General 71 80 80 15 - 80
1010.20.4200.5213.100 Professional/Contract Services General 5,600 65,500 65,500 30,500 - 65,500 1010.20.4200.5216.100 Communications General Services 760 607 607 123 - 607 1010.20.4200.5218.100 Advertising General 25 - - - - -
1010.20.4200.5219.100 Printing General 102 200 200 38 - 200 1010.20.4200.5220.100 Employee Development General 7,774 5,000 5,000 2,671 - 5,000 1010.20.4200.5223.105 Meals and Refreshments Emergencies and Meetings 1,132 1,000 1,000 1,006 1,000 2,000 1010.20.4200.5224 Travel Expenses - Lodging, Airfare, Incidentals - 2,500 2,500 - 3,000 5,500 1010.20.4200.5260 Miscellaneous (2,565) - - - - -
1010.20.4200.5304 Furniture & Equipment 4,441 4,500 4,500 - (4,000) 500 294,433 370,179 370,179 123,689 - 370,179
1010.20.4201.5101 Salaries - Permanent 126,982 144,186 144,186 36,645 - 144,186 1010.20.4201.5106.100 Incentives & Admin Leave Administrative Leave - 3,421 3,421 - - 3,421 1010.20.4201.5111 Medicare 1,989 2,140 2,140 577 - 2,140 1010.20.4201.5112.101 GASB 68 - Pension Expense PERS 24,324 26,489 26,489 18,461 - 26,489 1010.20.4201.5113 Worker's Compensation 881 750 750 249 - 750 1010.20.4201.5114.101 Health Insurance Medical 10,410 13,612 13,612 3,247 - 13,612 1010.20.4201.5114.102 Health Insurance Dental 1,279 - - 417 - - 1010.20.4201.5114.103 Health Insurance Vision 87 - - 27 - - 1010.20.4201.5115 Unemployment Compensation 873 - - 284 - - 1010.20.4201.5116.101 Life and Disability Insurance Life & Disab. 509 1,905 1,905 142 - 1,905 1010.20.4201.5116.102 Life and Disability Insurance Long Term/Short Term Disability 1,275 - - 391 - -
Program Total: 4200 - Town Manager
Program: 4201 - Central Services
1810
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.20.4201.5201.100 Office Supplies General 1,011 1,000 1,000 - - 1,000 1010.20.4201.5202.100 Operating Supplies General 3,775 3,145 3,145 720 - 3,145 1010.20.4201.5203.100 Repairs and Maint Supplies General 5,048 3,500 3,500 1,848 - 3,500 1010.20.4201.5209.101 Auto Fuel Expense Town Vehicles 1,131 2,000 2,000 - - 2,000 1010.20.4201.5210.100 Postage General - 50 50 - - 50
1010.20.4201.5211.135 Utilities Water and Sewer 1,445 1,401 1,401 233 - 1,401 1010.20.4201.5211.137 Utilities Electric and Gas 30,132 31,000 31,000 9,839 - 31,000 1010.20.4201.5212.100 Insurance General 264,212 289,850 289,850 297,051 10,000 299,850 1010.20.4201.5213.100 Professional/Contract Services General 47,114 66,525 66,525 24,667 - 66,525 1010.20.4201.5214.100 Repair and Maint Service General 27,177 26,800 26,800 3,898 - 26,800 1010.20.4201.5215.100 Rents and Leases Miscellaneous 1,578 1,620 1,620 541 - 1,620 1010.20.4201.5218.100 Advertising General - 100 100 - - 100 1010.20.4201.5219.100 Printing General 245 750 750 237 - 750 1010.20.4201.5220.100 Employee Development General 918 - - - - - 1010.20.4201.5223.105 Meals and Refreshments Emergencies and Meetings 72 - - - - - 1010.20.4201.5225 Bank Fees and Charges 0 - - - - -
1010.20.4201.5260 Miscellaneous 38,392 40,644 40,644 43,344 2,700 43,344 1010.20.4201.5304 Furniture & Equipment 1,162 - - - - - 1010.20.4201.5500 Bond Payments - Fiscal Agent 1,496 4,250 4,250 - - 4,250 593,519 665,138 665,138 442,820 12,700 677,838
1010.20.4202.5101 Salaries - Permanent 47,824 131,698 131,698 34,821 - 131,698 1010.20.4202.5106.100 Incentives & Admin Leave Administrative Leave 2,693 7,598 7,598 - - 7,598 1010.20.4202.5107 Car Allowance/Mileage 907 2,400 2,400 700 - 2,400 1010.20.4202.5111 Medicare 691 2,055 2,055 481 - 2,055
1010.20.4202.5112.101 GASB 68 - Pension Expense PERS 4,137 25,781 25,781 17,420 - 25,781 1010.20.4202.5113 Worker's Compensation - 685 685 227 - 685 1010.20.4202.5114.101 Health Insurance Medical 5,639 17,994 17,994 4,222 - 17,994 1010.20.4202.5114.102 Health Insurance Dental 901 - - 630 - - 1010.20.4202.5114.103 Health Insurance Vision 75 - - 53 - - 1010.20.4202.5115 Unemployment Compensation 274 - - 243 - - 1010.20.4202.5116.101 Life and Disability Insurance Life & Disab. 128 1,336 1,336 112 - 1,336 1010.20.4202.5116.102 Life and Disability Insurance Long Term/Short Term Disability 239 - - 234 - -
1010.20.4202.5199.199 Other Fund Support IT-Serv from Tech Fee (380,902) (463,123) (463,123) (167,837) - (463,123) 1010.20.4202.5202.100 Operating Supplies General 628 3,250 3,250 298 - 3,250 1010.20.4202.5209.101 Auto Fuel Expense Town Vehicles 881 - - - - - 1010.20.4202.5213.100 Professional/Contract Services General 270,218 59,890 59,890 28,766 - 59,890 Program Total: 4201 - Central Services
Program: 4202 - Information Technology
1811
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.20.4202.5214.100 Repair and Maint Service General 70,236 131,482 131,482 65,935 - 131,482 1010.20.4202.5215.106 Rents and Leases Copiers 2,203 2,184 2,184 728 - 2,184 1010.20.4202.5216.100 Communications General Services 41,992 49,320 49,320 11,193 - 49,320 1010.20.4202.5218.100 Advertising General 1,371 - - - - - 1010.20.4202.5219.100 Printing General 27 - - - - -
1010.20.4202.5220.100 Employee Development General - 5,000 5,000 554 - 5,000 1010.20.4202.5223.105 Meals and Refreshments Emergencies and Meetings 54 - - - - - 1010.20.4202.5225 Bank Fees and Charges 1,798 1,450 1,450 164 - 1,450 1010.20.4202.5304 Furniture & Equipment 23,825 21,000 21,000 1,057 - 21,000 95,838 - - (0) - -
1010.20.4203.5101 Salaries - Permanent 143,522 149,530 149,530 41,159 - 149,530 1010.20.4203.5106.100 Incentives & Admin Leave Administrative Leave 1,890 7,828 7,828 - - 7,828 1010.20.4203.5107 Car Allowance/Mileage 2,316 2,400 2,400 700 - 2,400 1010.20.4203.5111 Medicare 2,077 2,430 2,430 585 - 2,430 1010.20.4203.5112.101 GASB 68 - Pension Expense PERS 32,064 33,542 33,542 21,454 - 33,542 1010.20.4203.5113 Worker's Compensation 996 818 818 271 - 818 1010.20.4203.5114.101 Health Insurance Medical 16,135 21,019 21,019 4,908 - 21,019 1010.20.4203.5114.102 Health Insurance Dental 2,105 - - 630 - - 1010.20.4203.5114.103 Health Insurance Vision 180 - - 51 - - 1010.20.4203.5115 Unemployment Compensation 909 - - 292 - - 1010.20.4203.5116.101 Life and Disability Insurance Life & Disab. 505 1,473 1,473 146 - 1,473 1010.20.4203.5116.102 Life and Disability Insurance Long Term/Short Term Disability 910 - - 298 - -
1010.20.4203.5119.120 Retiree Costs PERS 1959 Survivor Benefits 4,061 3,750 3,750 - - 3,750 1010.20.4203.5201.100 Office Supplies General 358 500 500 35 - 500 1010.20.4203.5202.100 Operating Supplies General 471 700 700 7 - 700 1010.20.4203.5210.100 Postage General 3 25 25 22 - 25
1010.20.4203.5213.100 Professional/Contract Services General 1,481 2,218 2,218 2,285 - 2,218 1010.20.4203.5214.100 Repair and Maint Service General 373 500 500 - - 500 1010.20.4203.5216.100 Communications General Services 31 - - - - - 1010.20.4203.5219.100 Printing General 75 - - 0 - -
1010.20.4203.5220.100 Employee Development General 246 - - - - - 210,709 226,733 226,733 72,845 - 226,733
1010.20.4300.5210.100 Postage General - 10 10 - - 10
1010.20.4300.5213.100 Professional/Contract Services General 156,559 203,100 203,100 5,133 - 203,100 Program Total: 4300 - Legal Services 156,559 203,110 203,110 5,133 - 203,110 Program Total: 4202 - Information Technology
Program: 4203 - HR and Risk Management
Program Total: 4203 - HR and Risk Management
Program: 4300 - Legal Services
1812
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1,368,420 1,465,160 1,465,160 644,487 12,700 1,477,860
1010.25.4400.5101 Salaries - Permanent 156,006 171,452 171,452 45,764 - 171,452 1010.25.4400.5106.100 Incentives & Admin Leave Administrative Leave 8,392 8,924 8,924 - - 8,924 1010.25.4400.5107 Car Allowance/Mileage 1,992 1,992 1,992 581 - 1,992 1010.25.4400.5111 Medicare 2,358 2,644 2,644 653 - 2,644 1010.25.4400.5112.101 GASB 68 - Pension Expense PERS 30,134 31,539 31,539 22,143 - 31,539 1010.25.4400.5113 Worker's Compensation 1,084 892 892 296 - 892 1010.25.4400.5114.101 Health Insurance Medical 7,728 10,073 10,073 2,436 - 10,073 1010.25.4400.5114.102 Health Insurance Dental 914 - - 274 - - 1010.25.4400.5114.103 Health Insurance Vision 91 - - 27 - - 1010.25.4400.5115 Unemployment Compensation 1,034 - - 328 - - 1010.25.4400.5116.101 Life and Disability Insurance Life & Disab. 486 1,594 1,594 143 - 1,594 1010.25.4400.5116.102 Life and Disability Insurance Long Term/Short Term Disability 927 - - 305 - -
1010.25.4400.5119.100 Retiree Costs Medical Insurance 33,083 34,000 34,000 8,502 - 34,000 1010.25.4400.5201.100 Office Supplies General 267 500 500 18 - 500 1010.25.4400.5202.100 Operating Supplies General - 230 230 96 - 230 1010.25.4400.5210.100 Postage General 1,477 1,300 1,300 431 - 1,300 1010.25.4400.5213.100 Professional/Contract Services General 20,872 36,480 36,480 310 - 36,480 1010.25.4400.5218.100 Advertising General - 100 100 - - 100 1010.25.4400.5219.100 Printing General 1,272 1,000 1,000 - - 1,000 1010.25.4400.5220.100 Employee Development General 2,532 4,750 4,750 225 - 4,750 1010.25.4400.5220.110 Employee Development Education Reimb MOU Program 400 - - 600 - - 1010.25.4400.5304 Furniture & Equipment 4,158 1,500 1,500 - 2,150 3,650 275,208 308,970 308,970 83,131 2,150 311,120
1010.25.4420.301.5102 Salaries - Temporary 24,124 40,000 40,000 - - 40,000 1010.25.4420.301.5105 Salaries - Overtime/FLSA 5,733 - - - - - 1010.25.4420.301.5111 Medicare 432 - - - - -
1010.25.4420.301.5112.101 GASB 68 - Pension Expense PERS 76 - - - - - 1010.25.4420.301.5112.102 GASB 68 - Pension Expense Social Security 1,785 - - - - - 1010.25.4420.301.5113 Worker's Compensation 1,328 - - - - - 1010.25.4420.301.5114.101 Health Insurance Medical 220 - - - - - 1010.25.4420.301.5114.102 Health Insurance Dental 23 - - - - - 1010.25.4420.301.5114.103 Health Insurance Vision 2 - - - - - Cost Center Activity: 301 - Police Operations
Department Total: 20 - Administrative Services
Department: 25 - Finance
Program: 4400 - Finance
Program Total: 4400 - Finance
Program: 4420 - Measure C/V TUT
1813
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.25.4420.301.5115 Unemployment Compensation 190 - - - - - 1010.25.4420.301.5116.101 Life and Disability Insurance Life & Disab. 9 - - - - - 1010.25.4420.301.5202.100 Operating Supplies General 6,846 5,500 5,500 568 - 5,500 1010.25.4420.301.5213.100 Professional/Contract Services General 1,846 18,000 18,000 990 - 18,000 1010.25.4420.301.5220.100 Employee Development General 30,174 40,000 40,000 8,418 - 40,000 1010.25.4420.301.5303 Improvements 6,404 - - 945 - -
1010.25.4420.301.5304 Furniture & Equipment 249,872 - - - - - 1010.25.4420.301.5305 Vehicles - 235,000 235,000 7,122 - 235,000 1010.25.4420.301.5501 Debt Service Payment - Principal 15,194 - - - - - 344,258 338,500 338,500 18,043 - 338,500
1010.25.4420.302.5910.105 Transfers Out To Camp Fire Recovery Projects 7,920 - - 4,320 - - 7,920 - - 4,320 - -
1010.25.4420.303.5910.070 Transfers Out To Animal Control Fund 313,377 360,494 360,494 70,774 - 360,494 313,377 360,494 360,494 70,774 - 360,494
1010.25.4420.326.5213.100 Professional/Contract Services General 250,000 250,000 250,000 - - 250,000 1010.25.4420.326.5303 Improvements - - - - 50,000 50,000 1010.25.4420.326.5304 Furniture & Equipment 43,254 70,000 70,000 586 (50,000) 20,000 1010.25.4420.326.5305 Vehicles - 350,000 350,000 219,921 - 350,000 293,254 670,000 670,000 220,506 - 670,000
1010.25.4420.350.5305 Vehicles 113,963 142,000 142,000 - - 142,000 1010.25.4420.350.5910.100 Transfer out to Gas Tax Fund 110,273 - - - 144,000 144,000 224,236 142,000 142,000 - 144,000 286,000
1,183,046 1,510,994 1,510,994 313,643 144,000 1,654,994 1010.25.5005.5203.100 Repairs and Maint Supplies General 22 - - 7 - - 1010.25.5005.5211.175 Utilities Rental Properties 792 792 792 44 - 792 814 792 792 51 - 792
1,459,067 1,820,756 1,820,756 396,824 146,150 1,966,906 1010.30.4510.5101 Salaries - Permanent 407,610 484,467 484,467 122,936 - 484,467 1010.30.4510.5103.102 Differential Pay Out of Class 106 - - 103 - - 1010.30.4510.5104 Wages - PS Holiday Pay 18,612 24,383 24,383 6,974 - 24,383 1010.30.4510.5105 Salaries - Overtime/FLSA 311 500 500 144 - 500 Cost Center Activity Total: 301 - Police Operations
Cost Center Activity: 302 - Police Dispatch
Cost Center Activity Total: 302 - Police Dispatch
Cost Center Activity: 303 - Animal Control
Cost Center Activity Total: 303 - Animal Control
Program Total: 5005 - Rental Properties
Department Total: 25 - Finance
Department: 30 - Police
Program: 4510 - Police Administration
Cost Center Activity: 326 - Fire Suppression
Cost Center Activity Total: 326 - Fire Suppression
Cost Center Activity: 350 - Public Works Streets
Cost Center Activity Total: 350 - Public Works Streets
Program Total: 4420 - Measure C/V TUT
Program: 5005 - Rental Properties
1814
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.30.4510.5106.100 Incentives & Admin Leave Administrative Leave 20,571 25,940 25,940 7,471 - 25,940 1010.30.4510.5106.101 Incentives & Admin Leave School Incentive 21,342 26,363 26,363 7,296 - 26,363 1010.30.4510.5109.100 Allowances Uniform Allowance 2,403 1,860 1,860 814 - 1,860 1010.30.4510.5111 Medicare 6,617 8,164 8,164 2,033 - 8,164 1010.30.4510.5112.101 GASB 68 - Pension Expense PERS 368,868 385,047 385,047 300,405 - 385,047 1010.30.4510.5113 Worker's Compensation 30,993 28,070 28,070 9,304 - 28,070 1010.30.4510.5114.101 Health Insurance Medical 39,465 44,377 44,377 14,015 - 44,377 1010.30.4510.5114.102 Health Insurance Dental 7,610 - - 2,544 - - 1010.30.4510.5114.103 Health Insurance Vision 637 - - 207 - - 1010.30.4510.5115 Unemployment Compensation 2,880 - - 1,009 - - 1010.30.4510.5116.101 Life and Disability Insurance Life & Disab. 1,025 3,512 3,512 321 - 3,512 1010.30.4510.5116.102 Life and Disability Insurance Long Term/Short Term Disability 2,609 - - 971 - -
1010.30.4510.5119.100 Retiree Costs Medical Insurance 69,411 59,892 59,892 18,011 - 59,892 1010.30.4510.5201.100 Office Supplies General 594 2,000 2,000 399 - 2,000 1010.30.4510.5202.100 Operating Supplies General 5,415 5,650 5,650 1,148 - 5,650 1010.30.4510.5203.100 Repairs and Maint Supplies General 2,157 2,150 2,150 93 - 2,150 1010.30.4510.5210.100 Postage General 1,608 1,500 1,500 500 - 1,500 1010.30.4510.5211.135 Utilities Water and Sewer 1,137 1,137 1,137 200 - 1,137 1010.30.4510.5211.137 Utilities Electric and Gas 27,533 25,000 25,000 9,916 - 25,000 1010.30.4510.5211.139 Utilities Propane 1,971 1,750 1,750 - - 1,750 1010.30.4510.5213.100 Professional/Contract Services General 7,646 13,590 13,590 686 - 13,590 1010.30.4510.5214.100 Repair and Maint Service General 39,224 34,139 34,139 8,536 - 34,139 1010.30.4510.5215.100 Rents and Leases Miscellaneous 676 565 565 135 - 565 1010.30.4510.5215.106 Rents and Leases Copiers 1,447 1,344 1,344 445 - 1,344 1010.30.4510.5216.100 Communications General Services 14,405 12,240 12,240 3,966 - 12,240 1010.30.4510.5218.100 Advertising General 1,259 - - - - - 1010.30.4510.5219.100 Printing General 1,305 500 500 - - 500 1010.30.4510.5220.100 Employee Development General 7,072 8,500 8,500 741 - 8,500 1010.30.4510.5223.105 Meals and Refreshments Emergencies and Meetings 550 500 500 22 - 500 1010.30.4510.5225 Bank Fees and Charges 1,470 1,000 1,000 123 - 1,000 1010.30.4510.5303 Improvements - 14,000 14,000 - - 14,000 1010.30.4510.5304 Furniture & Equipment 15,690 2,500 2,500 - - 2,500 1,132,229 1,220,640 1,220,640 521,468 - 1,220,640
1010.30.4520.5101 Salaries - Permanent 1,231,392 1,502,582 1,502,582 347,349 - 1,502,582 1010.30.4520.5103.102 Differential Pay Out of Class 5,529 - - 4,091 - - 1010.30.4520.5103.105 Differential Pay Swing/Graveyard Shift 37,315 - - 11,161 - - Program Total: 4510 - Police Administration
Program: 4520 - Police Operations
1815
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.30.4520.5103.108 Differential Pay Canine Maintenance 15,708 - - 3,856 - - 1010.30.4520.5104 Wages - PS Holiday Pay 65,550 79,805 79,805 22,223 - 79,805 1010.30.4520.5105 Salaries - Overtime/FLSA 294,473 235,000 235,000 70,230 - 235,000 1010.30.4520.5106.100 Incentives & Admin Leave Administrative Leave - - - 34,726 - - 1010.30.4520.5106.101 Incentives & Admin Leave School Incentive 73,855 59,347 59,347 15,739 - 59,347 1010.30.4520.5106.103 Incentives & Admin Leave Team Pay 10,085 - - 2,628 - - 1010.30.4520.5106.200 Incentives & Admin Leave Gym Reimbursement - 360 360 - - 360 1010.30.4520.5106.205 Incentives & Admin Leave PS Recruitment Incentive - 5,000 5,000 - - 5,000 1010.30.4520.5109.100 Allowances Uniform Allowance 15,102 15,562 15,562 5,069 - 15,562 1010.30.4520.5111 Medicare 23,170 28,023 28,023 6,797 - 28,023 1010.30.4520.5112.101 GASB 68 - Pension Expense PERS 1,248,327 1,347,719 1,347,719 1,128,618 - 1,347,719 1010.30.4520.5113 Worker's Compensation 114,038 105,564 105,564 34,988 - 105,564 1010.30.4520.5114.101 Health Insurance Medical 198,063 252,993 252,993 55,803 - 252,993 1010.30.4520.5114.102 Health Insurance Dental 24,909 - - 7,509 - - 1010.30.4520.5114.103 Health Insurance Vision 2,177 - - 630 - - 1010.30.4520.5115 Unemployment Compensation 15,192 - - 3,277 - - 1010.30.4520.5116.101 Life and Disability Insurance Life & Disab. 3,859 16,711 16,711 1,112 - 16,711 1010.30.4520.5116.102 Life and Disability Insurance Long Term/Short Term Disability 10,353 - - 3,125 - -
1010.30.4520.5119.100 Retiree Costs Medical Insurance 143,591 154,019 154,019 36,499 - 154,019 1010.30.4520.5122 Accrual Bank Payoff 3,288 - - 422 - - 1010.30.4520.5199.130 Other Payroll Expenses Interfund Payroll Transfers (86,985) (93,478) (93,478) - - (93,478) 1010.30.4520.5202.100 Operating Supplies General 21,202 44,333 44,333 9,836 - 44,333 1010.30.4520.5204 Subscriptions and Code Books 1,235 500 500 - - 500 1010.30.4520.5209.101 Auto Fuel Expense Town Vehicles 80,917 70,000 70,000 13,257 - 70,000 1010.30.4520.5213.100 Professional/Contract Services General 7,389 10,200 10,200 2,434 - 10,200 1010.30.4520.5214.100 Repair and Maint Service General 810 1,500 1,500 - - 1,500 1010.30.4520.5216.100 Communications General Services 33,728 98,281 98,281 2,054 - 98,281 1010.30.4520.5218.100 Advertising General 235 200 200 - - 200 1010.30.4520.5220.110 Employee Development Education Reimb MOU Program - 200 200 - - 200 1010.30.4520.5223.105 Meals and Refreshments Emergencies and Meetings 26 - - - - - 1010.30.4520.5224 Travel Expenses - Lodging, Airfare, Incidentals 146 - - - - - 1010.30.4520.5304 Furniture & Equipment 8,750 65,500 3,000 - - 3,000 1010.30.4520.5305 Vehicles - - 62,500 - 12,500 75,000
1010.30.4520.5501 Debt Service Payment - Principal 10,861 10,861 10,861 10,861 - 10,861 3,614,289 4,010,782 4,010,782 1,834,294 12,500 4,023,282 1010.30.4530.5101 Salaries - Permanent 129,489 244,835 244,835 37,708 (10,500) 234,335 Program Total: 4520 - Police Operations
Program: 4530 - Public Safety Communications
1816
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.30.4530.5104 Wages - PS Holiday Pay 3,744 10,718 10,718 2,239 - 10,718 1010.30.4530.5105 Salaries - Overtime/FLSA 1,783 1,000 1,000 396 - 1,000 1010.30.4530.5106.100 Incentives & Admin Leave Administrative Leave - - - 2,084 - - 1010.30.4530.5106.101 Incentives & Admin Leave School Incentive 3,284 13,767 13,767 1,402 - 13,767 1010.30.4530.5106.200 Incentives & Admin Leave Gym Reimbursement 360 90 90 90 - 90 1010.30.4530.5109.100 Allowances Uniform Allowance 1,364 3,228 3,228 398 - 3,228 1010.30.4530.5109.101 Allowances Boot Allowance 500 - - 500 - - 1010.30.4530.5111 Medicare 1,705 3,968 3,968 556 - 3,968 1010.30.4530.5112.101 GASB 68 - Pension Expense PERS 28,250 51,845 51,845 32,974 - 51,845 1010.30.4530.5113 Worker's Compensation 3,085 4,888 4,888 1,620 - 4,888 1010.30.4530.5114.101 Health Insurance Medical 28,851 63,624 63,624 9,176 - 63,624 1010.30.4530.5114.102 Health Insurance Dental 4,280 - - 1,261 - - 1010.30.4530.5114.103 Health Insurance Vision 306 - - 91 - - 1010.30.4530.5115 Unemployment Compensation 748 - - 276 - - 1010.30.4530.5116.101 Life and Disability Insurance Life & Disab. 506 3,520 3,520 150 - 3,520 1010.30.4530.5116.102 Life and Disability Insurance Long Term/Short Term Disability 1,312 - - 398 - -
1010.30.4530.5119.100 Retiree Costs Medical Insurance 70,577 74,720 74,720 15,996 - 74,720 1010.30.4530.5122 Accrual Bank Payoff - - - 778 - -
1010.30.4530.5199.130 Other Payroll Expenses Interfund Payroll Transfers (61,358) (66,785) (66,785) - - (66,785) 1010.30.4530.5202.100 Operating Supplies General 656 2,200 2,200 - - 2,200 1010.30.4530.5204 Subscriptions and Code Books 160 190 190 - - 190 1010.30.4530.5213.100 Professional/Contract Services General 374,595 352,008 352,008 - - 352,008 1010.30.4530.5214.100 Repair and Maint Service General 22,310 96,310 96,310 - - 96,310 1010.30.4530.5216.100 Communications General Services 39,133 13,200 13,200 3,321 - 13,200 1010.30.4530.5218.100 Advertising General - 100 100 5,250 10,500 10,600 1010.30.4530.5220.100 Employee Development General 3,117 8,450 8,450 5,201 - 8,450 1010.30.4530.5304 Furniture & Equipment - 5,000 5,000 - - 5,000 658,757 886,876 886,876 121,866 - 886,876
1010.30.4550.5101 Salaries - Permanent 99,793 130,238 130,238 36,896 - 130,238 1010.30.4550.5109.100 Allowances Uniform Allowance 779 1,000 1,000 292 - 1,000 1010.30.4550.5109.101 Allowances Boot Allowance 1,000 1,000 1,000 1,000 - 1,000 1010.30.4550.5109.102 Allowances Tool Allowance 2,000 2,000 2,000 3,500 - 2,000 1010.30.4550.5111 Medicare 1,437 1,946 1,946 582 - 1,946 1010.30.4550.5112.101 GASB 68 - Pension Expense PERS 22,807 24,798 24,798 16,945 - 24,798 1010.30.4550.5113 Worker's Compensation 4,817 3,243 3,243 1,075 - 3,243 1010.30.4550.5114.101 Health Insurance Medical 9,626 14,277 14,277 3,247 - 14,277 Program Total: 4530 - Public Safety Communications
Program: 4550 - Fleet Management
1817
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.30.4550.5114.102 Health Insurance Dental 1,811 - - 600 - - 1010.30.4550.5114.103 Health Insurance Vision 99 - - 36 - - 1010.30.4550.5115 Unemployment Compensation 618 - - 287 - - 1818
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.30.4550.5116.101 Life and Disability Insurance Life & Disab. 417 1,845 1,845 150 - 1,845 1010.30.4550.5116.102 Life and Disability Insurance Long Term/Short Term Disability 987 - - 376 - -
1010.30.4550.5119.100 Retiree Costs Medical Insurance 7,259 7,213 7,213 1,774 - 7,213 1010.30.4550.5202.100 Operating Supplies General 12,328 4,500 4,500 6,745 - 4,500 1010.30.4550.5203.100 Repairs and Maint Supplies General 101,476 65,000 65,000 22,482 - 65,000 1010.30.4550.5203.300 Repairs and Maint Supplies Accident and Negligence 11,326 5,000 5,000 - - 5,000 1010.30.4550.5209.101 Auto Fuel Expense Town Vehicles 1,752 1,000 1,000 388 - 1,000 1010.30.4550.5210.100 Postage General - 50 50 26 - 50
1010.30.4550.5213.100 Professional/Contract Services General 4,082 2,316 2,316 346 - 2,316 1010.30.4550.5214.100 Repair and Maint Service General 33,130 22,000 22,000 3,939 - 22,000 1010.30.4550.5214.300 Repair and Maint Service Accident and Negligence 5,292 3,500 3,500 - - 3,500 1010.30.4550.5216.100 Communications General Services 900 900 900 263 - 900 1010.30.4550.5218.100 Advertising General 259 - - - - - 1010.30.4550.5220.100 Employee Development General 5,854 10,000 10,000 447 - 10,000 1010.30.4550.5224 Travel Expenses - Lodging, Airfare, Incidentals 42 - - - - - 1010.30.4550.5304 Furniture & Equipment 5,908 21,800 21,800 - - 21,800 335,799 323,626 323,626 101,394 - 323,626
5,741,075 6,441,924 6,441,924 2,579,022 12,500 6,454,424 1010.35.4610.5101 Salaries - Permanent 95,828 122,922 122,922 32,120 - 122,922 1010.35.4610.5105 Salaries - Overtime/FLSA 34 - - - - - 1010.35.4610.5106.200 Incentives & Admin Leave Gym Reimbursement - 60 60 - - 60 1010.35.4610.5109.100 Allowances Uniform Allowance 566 636 636 225 - 636 1010.35.4610.5109.101 Allowances Boot Allowance 565 700 700 565 - 700 1010.35.4610.5111 Medicare 1,522 1,802 1,802 519 - 1,802 1010.35.4610.5112.101 GASB 68 - Pension Expense PERS 18,158 22,496 22,496 15,613 - 22,496 1010.35.4610.5113 Worker's Compensation 2,436 2,299 2,299 762 - 2,299 1010.35.4610.5114.101 Health Insurance Medical 7,617 10,466 10,466 2,809 - 10,466 1010.35.4610.5115 Unemployment Compensation 656 - - 257 - - 1010.35.4610.5116.101 Life and Disability Insurance Life & Disab. 372 1,630 1,630 127 - 1,630 1010.35.4610.5116.102 Life and Disability Insurance Long Term/Short Term Disability 927 - - 343 - -
1010.35.4610.5119.100 Retiree Costs Medical Insurance 55,180 53,231 53,231 14,735 - 53,231 1010.35.4610.5201.100 Office Supplies General 212 400 400 33 - 400 1010.35.4610.5202.100 Operating Supplies General 1,574 3,450 3,450 508 - 3,450 1010.35.4610.5203.100 Repairs and Maint Supplies General 7,725 8,050 8,050 3,147 - 8,050 1010.35.4610.5209.101 Auto Fuel Expense Town Vehicles - 500 500 - - 500 Program Total: 4550 - Fleet Management
Department Total: 30 - Police
Department: 35 - Fire
Program: 4610 - Fire - Administrative
1819
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.35.4610.5210.100 Postage General 255 300 300 146 - 300 1010.35.4610.5211.135 Utilities Water and Sewer 2,589 2,300 2,300 376 - 2,300 1010.35.4610.5211.137 Utilities Electric and Gas 30,466 27,000 27,000 10,761 - 27,000 1010.35.4610.5211.139 Utilities Propane 698 750 750 155 - 750 1010.35.4610.5213.100 Professional/Contract Services General 5,072 1,476 1,476 265 - 1,476 1010.35.4610.5214.100 Repair and Maint Service General 7,442 7,320 7,320 6,275 - 7,320 1010.35.4610.5215.106 Rents and Leases Copiers 802 780 780 245 - 780 1010.35.4610.5216.100 Communications General Services 14,192 16,270 16,270 3,339 - 16,270 1010.35.4610.5219.100 Printing General - 11,000 11,000 - - 11,000 1010.35.4610.5225 Bank Fees and Charges - - - 398 - -
1010.35.4610.5303 Improvements - 35,100 35,100 22,046 - 35,100 254,885 330,938 330,938 115,771 - 330,938
1010.35.4615.5202.100 Operating Supplies General 18 400 400 959 - 400 1010.35.4615.5203.100 Repairs and Maint Supplies General - - - 75 - - 1010.35.4615.5213.100 Professional/Contract Services General 96 - - - - - 1010.35.4615.5214.100 Repair and Maint Service General 3,502 4,760 4,760 563 - 4,760 1010.35.4615.5216.100 Communications General Services 6,885 5,862 5,862 1,372 - 5,862 1010.35.4615.5223.105 Meals and Refreshments Emergencies and Meetings - 500 500 - - 500 1010.35.4615.5304 Furniture & Equipment - 6,500 6,500 - - 6,500 10,500 18,022 18,022 2,970 - 18,022
Program Total: 4610 - Fire - Administrative
Program: 4615 - Fire - EOC
Program Total: 4615 - Fire - EOC
1820
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.35.4620.5213.100 Professional/Contract Services General 13,175 - - - - - 13,175 - - - - -
1010.35.4630.5112.101 GASB 68 - Pension Expense PERS 112,411 224,287 224,287 224,287 - 224,287 1010.35.4630.5119.100 Retiree Costs Medical Insurance 165,243 164,362 164,362 41,308 - 164,362 1010.35.4630.5202.100 Operating Supplies General 8,712 12,750 12,750 4,212 - 12,750 1010.35.4630.5203.100 Repairs and Maint Supplies General 1,984 4,450 4,450 1,259 - 4,450 1010.35.4630.5209.101 Auto Fuel Expense Town Vehicles 28,822 19,000 19,000 4,837 - 19,000 1010.35.4630.5213.100 Professional/Contract Services General 3,813,964 4,320,404 4,320,404 - - 4,320,404 1010.35.4630.5214.100 Repair and Maint Service General 3,603 9,750 9,750 3,024 - 9,750 1010.35.4630.5220.100 Employee Development General (50) 500 500 - - 500 1010.35.4630.5223.105 Meals and Refreshments Emergencies and Meetings 14 200 200 - - 200 1010.35.4630.5269.135 Emergency Incident Costs Fire Related - 250 250 - - 250 1010.35.4630.5304 Furniture & Equipment 23,158 22,420 22,420 2,553 - 22,420 1010.35.4630.5305 Vehicles 4,952 659,000 659,000 570,000 - 659,000 1010.35.4630.5501 Debt Service Payment - Principal 68,738 68,738 68,738 68,738 - 68,738 4,231,550 5,506,111 5,506,111 920,217 - 5,506,111
1010.35.4640.5118 Volunteer Benefits 587 1,632 1,632 367 - 1,632 1010.35.4640.5202.100 Operating Supplies General - 200 200 - - 200 1010.35.4640.5213.100 Professional/Contract Services General 583 400 400 - - 400 1,170 2,232 2,232 367 - 2,232
4,511,280 5,857,303 5,857,303 1,039,325 - 5,857,303
1010.40.4720.5101 Salaries - Permanent 262,507 376,161 376,161 72,293 - 376,161 1010.40.4720.5105 Salaries - Overtime/FLSA 387 5,000 5,000 - - 5,000 1010.40.4720.5106.100 Incentives & Admin Leave Administrative Leave 2,962 6,076 6,076 - - 6,076 1010.40.4720.5106.200 Incentives & Admin Leave Gym Reimbursement 216 432 432 228 - 432 1010.40.4720.5107 Car Allowance/Mileage 360 360 360 105 - 360 1010.40.4720.5109.101 Allowances Boot Allowance 450 1,100 1,100 1,000 - 1,100 1010.40.4720.5111 Medicare 3,711 5,394 5,394 1,034 - 5,394 1010.40.4720.5112.101 GASB 68 - Pension Expense PERS 59,196 71,471 71,471 46,625 - 71,471 1010.40.4720.5113 Worker's Compensation 6,546 4,726 4,726 1,566 - 4,726 1010.40.4720.5114.101 Health Insurance Medical 33,974 61,595 61,595 9,394 - 61,595 1010.40.4720.5114.102 Health Insurance Dental 5,194 - - 1,339 - - 1010.40.4720.5114.103 Health Insurance Vision 455 - - 118 - - Department: 40 - Community Development
Program: 4720 - CDD Planning
Program Total: 4620 - Fire - Prevention
Program: 4630 - Fire - Suppression
Program Total: 4630 - Fire - Suppression
Program: 4640 - Fire - Volunteer Program
Program Total: 4640 - Fire - Volunteer Program
Department Total: 35 - Fire
Program: 4620 - Fire - Prevention
1821
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.40.4720.5115 Unemployment Compensation 1,626 - - 511 - - 1010.40.4720.5116.101 Life and Disability Insurance Life & Disab. 1,094 4,779 4,779 323 - 4,779 1010.40.4720.5116.102 Life and Disability Insurance Long Term/Short Term Disability 2,034 - - 568 - -
1010.40.4720.5119.100 Retiree Costs Medical Insurance 15,042 15,311 15,311 3,907 - 15,311 1010.40.4720.5122 Accrual Bank Payoff 145 - - - - -
1010.40.4720.5201.100 Office Supplies General 90 200 200 29 - 200 1010.40.4720.5202.100 Operating Supplies General 165 500 500 27 - 500 1010.40.4720.5209.101 Auto Fuel Expense Town Vehicles 4,081 4,000 4,000 430 - 4,000 1010.40.4720.5210.100 Postage General 232 500 500 70 - 500 1010.40.4720.5213.100 Professional/Contract Services General 167,510 800,000 800,000 35,905 - 800,000 1010.40.4720.5214.100 Repair and Maint Service General 5,073 5,500 5,500 5,327 - 5,500 1010.40.4720.5216.100 Communications General Services 901 8,032 8,032 - - 8,032 1010.40.4720.5218.100 Advertising General 3,152 2,000 2,000 290 - 2,000 1010.40.4720.5219.100 Printing General 54 55 55 86 - 55 1010.40.4720.5220.100 Employee Development General 665 5,000 5,000 1,123 - 5,000 1010.40.4720.5305 Vehicles - 84,000 84,000 - - 84,000
577,823 1,462,192 1,462,192 182,299 - 1,462,192
1010.40.4780.5101 Salaries - Permanent 5,905 - - 67 - - 1010.40.4780.5106.100 Incentives & Admin Leave Administrative Leave 243 - - - - - 1010.40.4780.5107 Car Allowance/Mileage 72 - - - - -
1010.40.4780.5111 Medicare 95 - - 1 - -
1010.40.4780.5112.101 GASB 68 - Pension Expense PERS 1,280 - - 5 - - 1010.40.4780.5113 Worker's Compensation 41 - - - - -
1010.40.4780.5114.101 Health Insurance Medical 349 - - - - - 1010.40.4780.5114.102 Health Insurance Dental 89 - - 1 - - 1010.40.4780.5114.103 Health Insurance Vision 9 - - 0 - - 1010.40.4780.5115 Unemployment Compensation 49 - - 0 - - 1010.40.4780.5116.101 Life and Disability Insurance Life & Disab. 22 - - 0 - - 1010.40.4780.5116.102 Life and Disability Insurance Long Term/Short Term Disability 71 - - 1 - -
1010.40.4780.5213.100 Professional/Contract Services General - 7,521 7,521 - - 7,521 8,225 7,521 7,521 75 - 7,521
586,049 1,469,713 1,469,713 182,375 - 1,469,713
1010.45.4740.5101 Salaries - Permanent 229,239 342,967 402,398 75,049 - 402,398 1010.45.4740.5105 Salaries - Overtime/FLSA 2,961 2,800 2,800 - - 2,800 Program Total: 4720 - CDD Planning
Program: 4780 - CDD - Waste Management
Program Total: 4780 - CDD - Waste Management
Department Total: 40 - Community Development
Department: 45 - Public Works
Program: 4740 - Public Works - Engineering
1822
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.45.4740.5106.100 Incentives & Admin Leave Administrative Leave 7,211 9,795 11,147 - - 11,147 1010.45.4740.5106.200 Incentives & Admin Leave Gym Reimbursement - - - 144 - - 1010.45.4740.5107 Car Allowance/Mileage 1,200 1,200 1,200 350 - 1,200 1010.45.4740.5109.101 Allowances Boot Allowance 400 800 1,200 460 - 1,200 1010.45.4740.5111 Medicare 3,516 5,185 6,072 1,115 - 6,072 1010.45.4740.5112.101 GASB 68 - Pension Expense PERS 46,526 66,734 81,224 44,126 - 81,224 1010.45.4740.5113 Worker's Compensation 19,108 29,135 32,640 9,657 - 32,640 1010.45.4740.5114.101 Health Insurance Medical 20,462 43,529 53,397 7,249 - 53,397 1010.45.4740.5114.102 Health Insurance Dental 2,263 - - 779 - - 1010.45.4740.5114.103 Health Insurance Vision 198 - - 64 - - 1010.45.4740.5115 Unemployment Compensation 1,529 - - 553 - - 1010.45.4740.5116.101 Life and Disability Insurance Life & Disab. 677 3,504 4,441 231 - 4,441 1010.45.4740.5116.102 Life and Disability Insurance Long Term/Short Term Disability 2,267 - - 803 - -
1010.45.4740.5119.100 Retiree Costs Medical Insurance 6,077 7,213 7,213 887 - 7,213 1010.45.4740.5201.100 Office Supplies General 691 1,500 1,500 186 - 1,500 1010.45.4740.5202.100 Operating Supplies General 1,835 1,200 1,200 - - 1,200 1010.45.4740.5203.100 Repairs and Maint Supplies General 94 100 100 - - 100 1010.45.4740.5204 Subscriptions and Code Books 216 - - - - - 1010.45.4740.5209.101 Auto Fuel Expense Town Vehicles 2,301 1,800 1,800 523 - 1,800 1010.45.4740.5210.100 Postage General 121 1,000 1,000 18 - 1,000 1010.45.4740.5213.100 Professional/Contract Services General 200,678 55,000 55,000 37,619 - 55,000 1010.45.4740.5214.100 Repair and Maint Service General 19,846 15,100 15,100 32,077 22,950 38,050 1010.45.4740.5216.100 Communications General Services 2,213 2,082 2,082 633 - 2,082 1010.45.4740.5218.100 Advertising General 831 700 700 805 - 700 1010.45.4740.5219.100 Printing General 206 110 110 (10) - 110 1010.45.4740.5220.100 Employee Development General 6,319 5,500 5,500 2,203 - 5,500 1010.45.4740.5223.105 Meals and Refreshments Emergencies and Meetings 383 - - 37 - - 1010.45.4740.5304 Furniture & Equipment 5,869 6,500 26,500 1,390 - 26,500 1010.45.4740.5305 Vehicles - 30,000 65,000 - 10,200 75,200 585,236 633,454 779,324 216,946 33,150 812,474
1010.45.4745.5202.100 Operating Supplies General 613 1,000 1,000 1,432 - 1,000 1010.45.4745.5203.100 Repairs and Maint Supplies General 2,017 1,000 1,000 459 - 1,000 1010.45.4745.5211.135 Utilities Water and Sewer 2,300 2,760 2,760 460 - 2,760 1010.45.4745.5211.137 Utilities Electric and Gas 2,230 2,050 2,050 630 - 2,050 1010.45.4745.5214.100 Repair and Maint Service General 59,024 58,800 58,800 17,505 - 58,800 1010.45.4745.5216.100 Communications General Services 274 275 275 69 - 275 Program Total: 4740 - Public Works - Engineering
Program: 4745 - Paradise Community Park
1823
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
66,458 65,885 65,885 20,555 - 65,885
1010.45.4747.5101 Salaries - Permanent 53,917 76,129 76,129 19,718 - 76,129 1010.45.4747.5105 Salaries - Overtime/FLSA 111 - - - - - Program Total: 4745 - Paradise Community Park
Program: 4747 - Public Facilities
1824
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1010.45.4747.5106.100 Incentives & Admin Leave Administrative Leave 863 897 897 - - 897 1010.45.4747.5109.101 Allowances Boot Allowance 99 560 560 560 - 560 1010.45.4747.5111 Medicare 735 1,125 1,125 265 - 1,125
1010.45.4747.5112.101 GASB 68 - Pension Expense PERS 11,079 13,913 13,913 9,654 - 13,913 1010.45.4747.5113 Worker's Compensation 13,693 15,515 15,515 5,142 - 15,515 1010.45.4747.5114.101 Health Insurance Medical 9,527 19,581 19,581 4,473 - 19,581 1010.45.4747.5114.102 Health Insurance Dental 1,649 - - 728 - - 1010.45.4747.5114.103 Health Insurance Vision 109 - - 45 - - 1010.45.4747.5115 Unemployment Compensation 314 - - 134 - - 1010.45.4747.5116.101 Life and Disability Insurance Life & Disab. 195 1,025 1,025 83 - 1,025 1010.45.4747.5116.102 Life and Disability Insurance Long Term/Short Term Disability 535 - - 216 - -
1010.45.4747.5201.100 Office Supplies General 64 - - - - - 1010.45.4747.5203.100 Repairs and Maint Supplies General 3,560 3,525 3,525 445 - 3,525 1010.45.4747.5211.135 Utilities Water and Sewer 5,061 4,380 4,380 761 - 4,380 1010.45.4747.5211.136 Utilities Refuse Service - - - 14,342 40,000 40,000 1010.45.4747.5214.100 Repair and Maint Service General 123,134 66,500 261,500 9,448 (200,000) 61,500 1010.45.4747.5218.100 Advertising General 140 140 140 - - 140 1010.45.4747.5219.100 Printing General 27 25 25 - - 25
1010.45.4747.5220.100 Employee Development General 200 - - - - - 1010.45.4747.5223.101 Meals and Refreshments Employee Meals-MOU Overtime 15 - - 45 - - 1010.45.4747.5303 Improvements - - - - 200,000 200,000
225,027 203,315 398,315 66,061 40,000 438,315
876,721 902,654 1,243,524 303,562 73,150 1,316,674
16,159,164 20,064,414 20,405,284 5,269,352 244,500 20,649,784 16,277,360 19,753,420 20,094,290 5,049,100 100,500 20,194,790 16,159,164 20,064,414 20,405,284 5,269,352 244,500 20,649,784 118,197 (310,994) (310,994) (220,252) (144,000) (454,994) 2030.40.4730.3380.102 Local Government Revenue Fines and Citations Onsite 2,800 1,000 1,000 - - 1,000 2030.40.4730.3401.301 CDD Building Plan Check Fees 1,227,024 1,200,000 1,200,000 243,343 - 1,200,000 2030.40.4730.3401.302 CDD Building Construction Review-Bldg Permit 1,836,955 1,812,000 1,812,000 487,742 - 1,812,000 2030.40.4730.3401.306 CDD Building Development Permit/DIF Est Req 307 400 400 - - 400 2030.40.4730.3401.320 CDD Building Permit Valuation Surcharge 636 1,000 1,000 310 - 1,000 Fund: 2030 - Building Safety & Waste Wtr Svcs

REVENUES
Department: 40 - Community Development
Program: 4730 - Building and Onsite Inspections
Program Total: 4747 - Public Facilities
Department Total: 45 - Public Works
EXPENSES Total
Fund REVENUE Total: 1010 - General Fund
Fund EXPENSE Total: 1010 - General Fund
Fund Total: 1010 - General Fund
1825
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2030.40.4730.3404.116 Onsite Land Use Review 56,577 48,000 48,000 11,899 - 48,000 2030.40.4730.3404.117 Onsite Repairs to Maintain Existing Use 102,249 100,000 100,000 19,038 - 100,000 2030.40.4730.3404.118 Onsite New Installation Standard System 9,104 8,000 8,000 - - 8,000 2030.40.4730.3404.119 Onsite Permit: Alteration/Expanded Use 53,655 45,000 45,000 17,392 - 45,000 2030.40.4730.3404.120 Onsite Review for Land Division 1,214 541 541 1,701 - 541 2030.40.4730.3404.125 Onsite Escrow Clearance 25,476 20,000 20,000 8,152 - 20,000 2030.40.4730.3404.126 Onsite Building Permit Clearance 48,381 46,000 46,000 10,736 - 46,000 2030.40.4730.3404.127 Onsite Operating Permit/Annual 378,424 385,000 385,000 2,646 - 385,000 2030.40.4730.3404.128 Onsite Construct Install Permit Renewal - 272 272 - - 272 2030.40.4730.3404.130 Onsite Water Well Clearance 94 190 190 - - 190 2030.40.4730.3404.137 Onsite Alternative Systems Review 9,253 8,000 8,000 1,367 - 8,000 2030.40.4730.3404.138 Onsite Abandonment of Septic System 2,219 1,500 1,500 143 - 1,500 2030.40.4730.3404.150 Onsite Annual Evaluator License Fee 817 850 850 894 - 850 2030.40.4730.3404.151 Onsite Extension Req for Eval or Repair - - - 33 - - 2030.40.4730.3410.150 Administrative Services Late Fees 16 - - - - - 2030.40.4730.3422.337 Fire Code Enforcement Inspection 244,082 228,000 228,000 74,873 - 228,000 2030.40.4730.3422.368 Fire Permit Fees 84,481 84,000 84,000 20,396 - 84,000 2030.40.4730.3610.100 Interest Revenue Investments - 10,000 10,000 - - 10,000 2030.40.4730.3901.100 Refunds and Reimbursements Miscellaneous - 10,000 10,000 - - 10,000 2030.40.4730.3902.110 Miscellaneous Revenue Cash Over and Short 1 - - - - - 2030.40.4730.3910.130 Transfers In From State Water Board Prop 1 3,690 - - - - - 2030.40.4730.3910.221 Transfers In From WWAD 411,165 - - - - - 2030.40.4730.3910.297 Transfers In Grants Miscellaneous State 83,451 - - - - - 2030.40.4730.3910.627 Transfers In From Tech Equipment Replacement - 116,000 116,000 - - 116,000 4,582,071 4,125,753 4,125,753 900,664 - 4,125,753
4,582,071 4,125,753 4,125,753 900,664 - 4,125,753
4,582,071 4,125,753 4,125,753 900,664 - 4,125,753
Program Total: 4730 - Building and Onsite Inspections
Department Total: 40 - Community Development
REVENUES Total
1826
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2030.40.4730.5101 Salaries - Permanent 946,550 1,290,844 1,290,844 306,597 - 1,290,844 2030.40.4730.5102 Salaries - Temporary 42,428 96,289 96,289 13,834 - 96,289 2030.40.4730.5105 Salaries - Overtime/FLSA 1,421 5,000 5,000 - - 5,000 2030.40.4730.5106.100 Incentives & Admin Leave Administrative Leave 19,804 21,884 21,884 - - 21,884 2030.40.4730.5106.200 Incentives & Admin Leave Gym Reimbursement 234 468 468 282 - 468 2030.40.4730.5107 Car Allowance/Mileage 2,372 2,448 2,448 701 - 2,448 2030.40.4730.5109.100 Allowances Uniform Allowance 3,675 3,028 3,028 1,254 - 3,028 2030.40.4730.5109.101 Allowances Boot Allowance 2,785 3,700 3,700 2,235 - 3,700 2030.40.4730.5111 Medicare 15,186 19,613 19,613 4,806 - 19,613 2030.40.4730.5112.101 GASB 68 - Pension Expense PERS 205,270 249,647 249,647 166,091 - 249,647 2030.40.4730.5112.102 GASB 68 - Pension Expense Social Security 767 5,970 5,970 418 - 5,970 2030.40.4730.5113 Worker's Compensation 31,170 28,639 28,639 9,492 - 28,639 2030.40.4730.5114.101 Health Insurance Medical 87,633 162,440 162,440 30,570 - 162,440 2030.40.4730.5114.102 Health Insurance Dental 17,467 - - 5,472 - - 2030.40.4730.5114.103 Health Insurance Vision 1,376 - - 422 - - 2030.40.4730.5115 Unemployment Compensation 6,268 - - 2,375 - - 2030.40.4730.5116.101 Life and Disability Insurance Life & Disab. 3,625 15,916 15,916 1,196 - 15,916 2030.40.4730.5116.102 Life and Disability Insurance Long Term/Short Term Disability 8,490 - - 2,990 - -
2030.40.4730.5119.100 Retiree Costs Medical Insurance 39,667 44,635 44,635 12,665 - 44,635 2030.40.4730.5122 Accrual Bank Payoff 8,234 - - 807 - - 2030.40.4730.5201.100 Office Supplies General 1,246 2,000 2,000 492 - 2,000 2030.40.4730.5202.100 Operating Supplies General 10,564 13,000 13,000 3,605 - 13,000 2030.40.4730.5203.100 Repairs and Maint Supplies General 22,984 26,500 26,500 626 - 26,500 2030.40.4730.5204 Subscriptions and Code Books 1,954 9,000 9,000 812 - 9,000 2030.40.4730.5209.101 Auto Fuel Expense Town Vehicles 10,308 7,000 7,000 2,500 - 7,000 2030.40.4730.5210.100 Postage General (135) 1,500 1,500 (275) - 1,500 2030.40.4730.5211.135 Utilities Water and Sewer 1,729 3,000 3,000 288 - 3,000 2030.40.4730.5211.137 Utilities Electric and Gas 30,784 45,600 45,600 9,261 - 45,600 2030.40.4730.5213.100 Professional/Contract Services General 1,033,858 903,650 903,650 175,044 - 903,650 2030.40.4730.5214.100 Repair and Maint Service General 156,889 258,490 258,490 126,885 - 258,490 2030.40.4730.5215.100 Rents and Leases Miscellaneous 2,080 2,300 2,300 637 - 2,300 2030.40.4730.5215.106 Rents and Leases Copiers 8,162 5,400 5,400 1,424 - 5,400 2030.40.4730.5216.100 Communications General Services 13,280 28,645 28,645 5,131 - 28,645 2030.40.4730.5218.100 Advertising General 690 500 500 - - 500

EXPENSES
Department: 40 - Community Development
Program: 4730 - Building and Onsite Inspections
1827
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2030.40.4730.5219.100 Printing General 611 1,000 1,000 129 - 1,000 2030.40.4730.5220.100 Employee Development General 8,525 30,000 30,000 4,979 - 30,000 2030.40.4730.5223.105 Meals and Refreshments Emergencies and Meetings 1,078 2,400 2,400 365 - 2,400 2030.40.4730.5225 Bank Fees and Charges 48,240 36,000 36,000 5,346 - 36,000 2030.40.4730.5303 Improvements 17,185 80,000 80,000 - - 80,000 2030.40.4730.5304 Furniture & Equipment 6,665 45,300 45,300 22,277 - 45,300 2030.40.4730.5305 Vehicles 147,417 64,000 64,000 - - 64,000 2030.40.4730.5501 Debt Service Payment - Principal 7,944 4,830 4,830 4,091 - 4,830 2030.40.4730.5910.010 Transfers Out To General Fund 262,686 341,836 341,836 - - 341,836 3,239,168 3,862,472 3,862,472 925,822 - 3,862,472
3,239,168 3,862,472 3,862,472 925,822 - 3,862,472
3,239,168 3,862,472 3,862,472 925,822 - 3,862,472
4,582,071 4,125,753 4,125,753 900,664 - 4,125,753
3,239,168 3,862,472 3,862,472 925,822 - 3,862,472
1,342,903 263,281 263,281 (25,159) - 263,281
2070.30.4540.3120.330 Other Taxes Voter Appointed Parcel Tax 131,776 130,000 130,000 - - 130,000 2070.30.4540.3380.105 Local Government Revenue Fines and Citations Animal Cntrl 4,950 500 500 - - 500
2070.30.4540.3410.113 Administrative Services Document Copying - 25 25 - - 25 2070.30.4540.3410.150 Administrative Services Late Fees 373 250 250 40 - 250 2070.30.4540.3455.200 Animal Control Adoption Fees 5,451 4,500 4,500 1,372 - 4,500 2070.30.4540.3455.205 Animal Control Surrender/Euth/Disp Fees 393 500 500 75 - 500 2070.30.4540.3455.210 Animal Control Dog Licenses 8,021 6,296 6,296 2,740 - 6,296 2070.30.4540.3455.215 Animal Control Dangerous/Wild Animal Permit 122 - - 122 - - 2070.30.4540.3455.225 Animal Control Impound/Quarantine Fees 6,545 6,000 6,000 1,577 - 6,000 2070.30.4540.3455.226 Animal Control Impound Unaltered State Fee 1,130 850 850 245 - 850 2070.30.4540.3901.100 Refunds and Reimbursements Miscellaneous 12,789 - - - - - 2070.30.4540.3902.100 Miscellaneous Revenue General 8 - - (0) - - 2070.30.4540.3910.010 Transfers In From General Fund - 360,494 360,494 - - 360,494 2070.30.4540.3910.138 Transfers In From USDA Fund - 61,000 61,000 - - 61,000 2070.30.4540.3910.811 Transfers In From Animal Control Donations 3,500 6,917 6,917 - - 6,917 175,058 577,332 577,332 6,172 - 577,332
175,058 577,332 577,332 6,172 - 577,332
175,058 577,332 577,332 6,172 - 577,332
Department: 30 - Police
Program: 4540 - Police - Animal Control
Program Total: 4540 - Police - Animal Control
Department Total: 30 - Police
REVENUES Total
EXPENSES Total
Fund REVENUE Total: 2030 - Building Safety & Waste Wtr Svcs Fund EXPENSE Total: 2030 - Building Safety & Waste Wtr Svcs Fund Total: 2030 - Building Safety & Waste Wtr Svcs
Fund: 2070 - Animal Control

REVENUES
Program Total: 4730 - Building and Onsite Inspections
Department Total: 40 - Community Development
1828
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2070.30.4540.5101 Salaries - Permanent 173,551 215,048 215,048 38,799 - 215,048 2070.30.4540.5103.102 Differential Pay Out of Class 1,042 - - 689 - - 2070.30.4540.5104 Wages - PS Holiday Pay 8,606 10,273 10,273 2,012 - 10,273 2070.30.4540.5105 Salaries - Overtime/FLSA 1,360 2,500 2,500 634 - 2,500 2070.30.4540.5109.100 Allowances Uniform Allowance 2,359 2,558 2,558 547 - 2,558 2070.30.4540.5111 Medicare 2,572 3,340 3,340 591 - 3,340 2070.30.4540.5112.101 GASB 68 - Pension Expense PERS 39,508 43,023 43,023 27,816 - 43,023 2070.30.4540.5113 Worker's Compensation 12,488 11,603 11,603 3,846 - 11,603 2070.30.4540.5114.101 Health Insurance Medical 23,272 33,194 33,194 4,366 - 33,194 2070.30.4540.5114.102 Health Insurance Dental 3,302 - - 646 - - 2070.30.4540.5114.103 Health Insurance Vision 185 - - 35 - - 2070.30.4540.5115 Unemployment Compensation 1,144 - - 289 - - 2070.30.4540.5116.101 Life and Disability Insurance Life & Disab. 867 3,171 3,171 201 - 3,171 2070.30.4540.5116.102 Life and Disability Insurance Long Term/Short Term Disability 2,049 - - 413 - -
2070.30.4540.5119.100 Retiree Costs Medical Insurance 8,837 9,295 9,295 2,299 - 9,295 2070.30.4540.5122 Accrual Bank Payoff - - - 9 - -
2070.30.4540.5201.100 Office Supplies General 30 475 475 - - 475 2070.30.4540.5202.100 Operating Supplies General 8,611 9,900 9,900 1,266 - 9,900 2070.30.4540.5203.100 Repairs and Maint Supplies General 1,933 1,000 1,000 31 - 1,000 2070.30.4540.5204 Subscriptions and Code Books 144 180 180 - - 180 2070.30.4540.5209.101 Auto Fuel Expense Town Vehicles 6,049 7,000 7,000 1,221 - 7,000 2070.30.4540.5210.100 Postage General 1 - - - - -
2070.30.4540.5211.135 Utilities Water and Sewer 528 1,055 1,055 88 - 1,055 2070.30.4540.5211.137 Utilities Electric and Gas 4,841 4,125 4,125 1,997 - 4,125 2070.30.4540.5211.139 Utilities Propane 4,015 5,000 5,000 251 - 5,000 2070.30.4540.5213.100 Professional/Contract Services General 28,625 16,050 16,050 8,189 - 16,050 2070.30.4540.5214.100 Repair and Maint Service General 8,894 10,637 10,637 259 - 10,637 2070.30.4540.5215.100 Rents and Leases Miscellaneous - 1 1 - - 1 2070.30.4540.5216.100 Communications General Services 2,419 2,630 2,630 359 - 2,630 2070.30.4540.5219.100 Printing General 42 400 400 - - 400 2070.30.4540.5220.100 Employee Development General 1,532 8,750 8,750 60 - 8,750 2070.30.4540.5223.101 Meals and Refreshments Employee Meals-MOU Overtime - 30 30 - - 30 2070.30.4540.5225 Bank Fees and Charges 1,473 1,250 1,250 125 - 1,250 2070.30.4540.5303 Improvements - 4,500 4,500 - - 4,500

EXPENSES
Department: 30 - Police
Program: 4540 - Police - Animal Control
1829
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2070.30.4540.5305 Vehicles 106,229 104,000 104,000 - - 104,000 2070.30.4540.5910.010 Transfers Out To General Fund 54,357 66,344 66,344 - - 66,344 510,864 577,332 577,332 97,037 - 577,332
510,864 577,332 577,332 97,037 - 577,332
510,864 577,332 577,332 97,037 - 577,332
175,058 577,332 577,332 6,172 - 577,332
510,864 577,332 577,332 97,037 - 577,332
(335,806) - - (90,866) - -
2090.00.0000.3345.100 State Revenues - Other Refunds & Reimbursements - 4,642,667 4,642,667 - - 4,642,667 2090.00.0000.3901.145 Refunds and Reimbursements Insurance Proceeds - 648,150 648,150 - - 648,150 2090.00.0000.3902.100 Miscellaneous Revenue General 5,412 - - - - - 2090.00.0000.3910.010 Transfers In From General Fund - 373,273 373,273 - - 373,273 2090.00.0000.3910.136 Transfers In From FEMA Grants FHMG 13,741 376,188 376,188 - - 376,188 2090.00.0000.3910.301 Transfers In CDBG - DR 4,580 309,511 309,511 - - 309,511 23,734 6,349,789 6,349,789 - - 6,349,789
23,734 6,349,789 6,349,789 - - 6,349,789
23,734 6,349,789 6,349,789 - - 6,349,789
2090.00.0000.5213.100 Professional/Contract Services General 1,100 - - - - - 1,100 - - - - -
2090.00.0000.504.5224 Travel Expenses - Lodging, Airfare, Incidentals (154) - - - - - (154) - - - - -
2090.00.0000.506.5213.100 Professional/Contract Services General 102,150 45,000 45,000 - - 45,000 102,150 45,000 45,000 - - 45,000
2090.00.0000.507.5202.100 Operating Supplies General 2,000 - - 323 - - 2090.00.0000.507.5209.105 Auto Fuel Expense Employee Personal Vehicle Use 73 - - - - - 2090.00.0000.507.5213.100 Professional/Contract Services General 148,164 - - 15,776 - - Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Fund EXPENSE Total: 2070 - Animal Control
Fund Total: 2070 - Animal Control
Fund: 2090 - Camp Fire 2018

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 4540 - Police - Animal Control
Department Total: 30 - Police
EXPENSES Total
Fund REVENUE Total: 2070 - Animal Control
Cost Center Activity: 507 - FEMA Haz Tree Removal (P2) - A1 Cost Center Activity:

Cost Center Activity Total
Cost Center Activity: 504 - FEMA Safety Assessment (SAP) B10 Cost Center Activity Total: 504 - FEMA Safety Assessment (SAP) B10 Cost Center Activity: 506 - FEMA Administrative Costs Z1 Cost Center Activity Total: 506 - FEMA Administrative Costs Z1 1830
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
150,237 - - 16,099 - -
2090.00.0000.560.5213.100 Professional/Contract Services General 56,740 10,000 10,000 - - 10,000 56,740 10,000 10,000 - - 10,000
2090.00.0000.561.5213.100 Professional/Contract Services General 12,546 - - - - - 12,546 - - - - -
322,619 55,000 55,000 16,099 - 55,000
322,619 55,000 55,000 16,099 - 55,000
2090.30.4540.572.5303 Improvements 4,905 - - - - -
4,905 - - - - -
4,905 - - - - -
4,905 - - - - -
2090.45.4740.506.5213.100 Professional/Contract Services General (7,426) - - - - - (7,426) - - - - -
2090.45.4740.559.5213.100 Professional/Contract Services General (28,875) - - - - - (28,875) - - - - -
(36,301) - - - - -
2090.45.4743.506.5213.100 Professional/Contract Services General (2,222) - - - - - (2,222) - - - - -
(2,222) - - - - -
2090.45.4747.558.5214.100 Repair and Maint Service General 31,750 - - 3,639 - - 31,750 - - 3,639 - -
31,750 - - 3,639 - -
2090.45.4750.508.5910.120 Transfers Out To State Gas Tax Fund 2,754 - - - - - Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Department: 30 - Police
Program: 4540 - Police - Animal Control
Cost Center Activity: 572 - NV Grant-Animal Control & Shelte Cost Center Activity Total: 572 - NV Grant-Animal Control & Shelte Cost Center Activity Total: 507 - FEMA Haz Tree Removal (P2) - A1 Cost Center Activity: 560 - Insurance Claim Preparation Cost Center Activity Total: 560 - Insurance Claim Preparation Cost Center Activity: 561 - HMGP Administration
Cost Center Activity Total: 561 - HMGP Administration
Program Total: 4743 - Streets and Roads
Program: 4747 - Public Facilities
Cost Center Activity: 558 - Insurance Extra Expense
Cost Center Activity Total: 558 - Insurance Extra Expense Program Total: 4747 - Public Facilities
Program: 4750 - Public Works - Streets Maint.

Cost Center Activity: 559 - Insurance - Infrastructure
Cost Center Activity Total: 559 - Insurance - Infrastructure Program Total: 4740 - Public Works - Engineering
Program: 4743 - Streets and Roads
Cost Center Activity: 506 - FEMA Administrative Costs Z1 Cost Center Activity Total: 506 - FEMA Administrative Costs Z1 Program Total: 4540 - Police - Animal Control
Department Total: 30 - Police
Department: 45 - Public Works
Program: 4740 - Public Works - Engineering
Cost Center Activity: 506 - FEMA Administrative Costs Z1 Cost Center Activity Total: 506 - FEMA Administrative Costs Z1 Cost Center Activity: 508 - FEMA - Culverts - C1-10
1831
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2090.45.4750.508.8408 Off-System Culvert Repair 27,965 607,790 607,790 309 - 607,790 30,718 607,790 607,790 309 - 607,790
2090.45.4750.509.5910.120 Transfers Out To State Gas Tax Fund 29,395 41,539 41,539 - - 41,539 2090.45.4750.509.8407 Off System Road Rehabilitation 1,413,901 4,006,488 4,006,488 63,321 - 4,006,488 1,443,296 4,048,027 4,048,027 63,321 - 4,048,027
2090.45.4750.516.8404 Camp Fire Hydrant Repairs - 251,361 251,361 - - 251,361 - 251,361 251,361 - - 251,361
2090.45.4750.554.5304 Furniture & Equipment - - - 2,285 - - - - - 2,285 - -
2090.45.4750.556.5215.131 Rents and Leases Street Maintenance Equipment - 10,000 10,000 - - 10,000 - 10,000 10,000 - - 10,000
2090.45.4750.559.5203.100 Repairs and Maint Supplies General - - - 629 - - 2090.45.4750.559.5910.100 Transfers Out To Capital Projects - 500,000 500,000 - - 500,000 2090.45.4750.559.5910.105 Transfers Out To Camp Fire Recovery Projects - 96,400 96,400 - - 96,400 2090.45.4750.559.8402 Trailway Lighting Repairs 540 31,750 31,750 - - 31,750 2090.45.4750.559.8403 Skyway/Pearson Traffic Signal Repair 287,408 - - 19,348 - - 287,948 628,150 628,150 19,977 - 628,150
1,761,962 5,545,328 5,545,328 85,892 - 5,545,328
1,755,190 5,545,328 5,545,328 89,531 - 5,545,328
2090.65.4205.590.5101 Salaries - Permanent 196,929 337,215 337,215 63,312 - 337,215 2090.65.4205.590.5102 Salaries - Temporary 8,414 43,215 43,215 2,262 - 43,215 2090.65.4205.590.5103.102 Differential Pay Out of Class 632 - - - - - 2090.65.4205.590.5106.100 Incentives & Admin Leave Administrative Leave 7,945 12,371 12,371 - - 12,371 2090.65.4205.590.5106.200 Incentives & Admin Leave Gym Reimbursement - - - 300 - - 2090.65.4205.590.5107 Car Allowance/Mileage 2,400 2,400 2,400 700 - 2,400 2090.65.4205.590.5109.101 Allowances Boot Allowance - - - 300 - - 2090.65.4205.590.5111 Medicare 3,429 5,730 5,730 1,014 - 5,730 2090.65.4205.590.5112.101 GASB 68 - Pension Expense PERS 62,633 64,379 64,379 41,230 - 64,379 2090.65.4205.590.5113 Worker's Compensation 2,236 1,978 1,978 656 - 1,978 2090.65.4205.590.5114.101 Health Insurance Medical 11,451 41,402 41,402 3,247 - 41,402 Program Total: 4750 - Public Works - Streets Maint.

Department Total: 45 - Public Works
Department: 65 - Emergency Mngmt & Disaster Recov
Program: 4205 - Disaster Recovery
Cost Center Activity: 590 - Disaster Management
Cost Center Activity: 554 - Insurance Facility Yard Equip Cost Center Activity Total: 554 - Insurance Facility Yard Equip Cost Center Activity: 556 - Insurance Veh & Equip Repair/Rep Cost Center Activity Total: 556 - Insurance Veh & Equip Repair/Rep Cost Center Activity: 559 - Insurance - Infrastructure
Cost Center Activity Total: 559 - Insurance - Infrastructure Cost Center Activity Total: 508 - FEMA - Culverts - C1-10 Cost Center Activity: 509 - FEMA - Non Fed Aid Roads - C2 Cost Center Activity Total: 509 - FEMA - Non Fed Aid Roads - C2 Cost Center Activity: 516 - FEMA - Camp Fire Hydrant Repairs Cost Center Activity Total: 516 - FEMA - Camp Fire Hydrant Repairs 1832
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2090.65.4205.590.5114.102 Health Insurance Dental 2,017 - - 630 - - 2090.65.4205.590.5115 Unemployment Compensation 1,503 - - 501 - - 2090.65.4205.590.5116.101 Life and Disability Insurance Life & Disab. 628 3,601 3,601 187 - 3,601 2090.65.4205.590.5116.102 Life and Disability Insurance Long Term/Short Term Disability 1,963 - - 681 - -
2090.65.4205.590.5122 Accrual Bank Payoff 11,921 - - - - - 2090.65.4205.590.5201.100 Office Supplies General 669 300 300 - - 300 2090.65.4205.590.5202.100 Operating Supplies General 106 200 200 - - 200 2090.65.4205.590.5203.100 Repairs and Maint Supplies General - 619 619 - - 619 2090.65.4205.590.5204 Subscriptions and Code Books 1 - - - - - 2090.65.4205.590.5213.100 Professional/Contract Services General 126,229 118,577 118,577 20,495 - 118,577 2090.65.4205.590.5216.100 Communications General Services 494 10,600 10,600 4,981 - 10,600 2090.65.4205.590.5218.100 Advertising General 280 125 125 451 - 125 2090.65.4205.590.5219.100 Printing General 80 - - - - - 2090.65.4205.590.5220.100 Employee Development General 2,090 8,500 8,500 - - 8,500 2090.65.4205.590.5223.105 Meals and Refreshments Emergencies and Meetings - 2,500 2,500 42 - 2,500 2090.65.4205.590.5304 Furniture & Equipment 2,932 1,000 1,000 247 - 1,000 2090.65.4205.590.5910.010 Transfers Out To General Fund 321,790 94,749 94,749 - - 94,749 768,770 749,461 749,461 141,236 - 749,461
768,770 749,461 749,461 141,236 - 749,461
768,770 749,461 749,461 141,236 - 749,461
2,851,484 6,349,789 6,349,789 246,867 - 6,349,789
23,734 6,349,789 6,349,789 - - 6,349,789
2,851,484 6,349,789 6,349,789 246,867 - 6,349,789
(2,827,750) - - (246,867) - -
Cost Center Activity Total: 590 - Disaster Management
Program Total: 4205 - Disaster Recovery
Department Total: 65 - Emergency Mngmt & Disaster Recov EXPENSES Total
Fund REVENUE Total: 2090 - Camp Fire 2018
Fund EXPENSE Total: 2090 - Camp Fire 2018
Fund Total: 2090 - Camp Fire 2018
1833
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2095.00.0000.595.3320.100 Federal Revenue - Other Refunds and Reimbursements 25,983 - - - - - 2095.00.0000.595.3345.100 State Revenues - Other Refunds & Reimbursements 1,339,227 1,396,407 1,396,407 - - 1,396,407 1,365,210 1,396,407 1,396,407 - - 1,396,407
1,365,210 1,396,407 1,396,407 - - 1,396,407
1,365,210 1,396,407 1,396,407 - - 1,396,407
1,365,210 1,396,407 1,396,407 - - 1,396,407
2095.00.0000.595.5101 Salaries - Permanent 52,056 50,000 50,000 21,717 - 50,000 2095.00.0000.595.5111 Medicare 702 - - 297 - -
2095.00.0000.595.5112.101 GASB 68 - Pension Expense PERS 3,775 - - 2,000 - - 2095.00.0000.595.5114.101 Health Insurance Medical 4,043 - - 1,801 - - 2095.00.0000.595.5114.103 Health Insurance Vision 66 - - 28 - - 2095.00.0000.595.5115 Unemployment Compensation 310 - - 131 - - 2095.00.0000.595.5116.101 Life and Disability Insurance Life & Disab. 206 - - 62 - - 2095.00.0000.595.5116.102 Life and Disability Insurance Long Term/Short Term Disability 519 - - 14 - -
2095.00.0000.595.5202.100 Operating Supplies General 6,930 17,500 17,500 574 - 17,500 2095.00.0000.595.5203.100 Repairs and Maint Supplies General 2,219 - - - - - 2095.00.0000.595.5213.100 Professional/Contract Services General 500 5,000 5,000 - - 5,000 2095.00.0000.595.5214.100 Repair and Maint Service General 1,500 - - - - - 2095.00.0000.595.5304 Furniture & Equipment - 5,000 5,000 - - 5,000 2095.00.0000.595.5910.010 Transfers Out To General Fund - 102,000 297,000 - - 297,000 2095.00.0000.595.5910.105 Transfers Out To Camp Fire Recovery Projects - 820,000 1,302,561 - - 1,302,561 72,825 999,500 1,677,061 26,624 - 1,677,061
72,825 999,500 1,677,061 26,624 - 1,677,061
72,825 999,500 1,677,061 26,624 - 1,677,061
2095.20.4202.595.5304 Furniture & Equipment 1,005 - - - - - Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Fund: 2095 - COVID-19

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Department: 20 - Administrative Services
Program: 4202 - Information Technology
1834
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1,005 - - - - -
1,005 - - - - -
2095.20.4203.595.5202.100 Operating Supplies General 110 - - - - - 110 - - - - -
110 - - - - -
1,116 - - - - -
2095.30.4510.595.5213.100 Professional/Contract Services General 150 - - - - - 150 - - - - -
150 - - - - -
2095.30.4520.595.5213.100 Professional/Contract Services General 147 - - - - - 147 - - - - -
147 - - - - -
297 - - - - -
2095.35.4610.595.5214.100 Repair and Maint Service General - 150,000 250,000 754 (250,000) - 2095.35.4610.595.5214.100 Repair and Maint Service General - - - - 250,000 250,000 - 150,000 250,000 754 - 250,000
- 150,000 250,000 754 - 250,000
- 150,000 250,000 754 - 250,000
Program Total: 4203 - HR and Risk Management
Department Total: 20 - Administrative Services
Department: 30 - Police
Program: 4510 - Police Administration
Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Program Total: 4202 - Information Technology
Program: 4203 - HR and Risk Management
Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Department: 35 - Fire
Program: 4610 - Fire - Administrative
Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Program Total: 4610 - Fire - Administrative
Department Total: 35 - Fire
Program Total: 4510 - Police Administration
Program: 4520 - Police Operations
Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Program Total: 4520 - Police Operations
Department Total: 30 - Police
1835
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2095.40.4720.595.5202.100 Operating Supplies General 2,127 - - - - - 2,127 - - - - -
2,127 - - - - -
2095.40.4730.595.5202.100 Operating Supplies General 43 - - - - - 43 - - - - -
43 - - - - -
2,170 - - - - -
2095.45.4747.595.5214.100 Repair and Maint Service General - 10,000 10,000 - - 10,000 - 10,000 10,000 - - 10,000
- 10,000 10,000 - - 10,000
2095.45.4750.595.5215.100 Rents and Leases Miscellaneous 22,218 - - - - - 22,218 - - - - -
22,218 - - - - -
22,218 10,000 10,000 - - 10,000
2095.65.4205.595.5213.100 Professional/Contract Services General - 200,000 200,000 - - 200,000 - 200,000 200,000 - - 200,000
- 200,000 200,000 - - 200,000
- 200,000 200,000 - - 200,000
98,626 1,359,500 2,137,061 27,378 - 2,137,061
1,365,210 1,396,407 1,396,407 - - 1,396,407
98,626 1,359,500 2,137,061 27,378 - 2,137,061
1,266,584 36,907 (740,654) (27,378) - (740,654)
Department: 40 - Community Development
Program: 4720 - CDD Planning
Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Program Total: 4720 - CDD Planning
Program: 4730 - Building and Onsite Inspections
Program Total: 4750 - Public Works - Streets Maint.

Department Total: 45 - Public Works
Department: 65 - Emergency Mngmt & Disaster Recov
Program: 4205 - Disaster Recovery
Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Program Total: 4747 - Public Facilities
Program: 4750 - Public Works - Streets Maint.

Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Cost Center Activity: 595 - COVID-19 - Emergency Response Cost Center Activity Total: 595 - COVID-19 - Emergency Response Program Total: 4730 - Building and Onsite Inspections
Department Total: 40 - Community Development
Department: 45 - Public Works
Program: 4747 - Public Facilities
Fund: 2100 - CIP Fund

REVENUES
Program Total: 4205 - Disaster Recovery
Department Total: 65 - Emergency Mngmt & Disaster Recov EXPENSES Total
Fund REVENUE Total: 2095 - COVID-19
Fund EXPENSE Total: 2095 - COVID-19
Fund Total: 2095 - COVID-19
1836
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2100.50.8901.3910.090 Transfers In From Camp Fire Recovery - 500,000 500,000 - - 500,000 2100.50.8901.3910.110 Transfers In From Local Transportation Fund 196,416 676,099 676,099 - 100,000 776,099 2100.50.8901.3910.120 Transfers In From Gas Tax Fund - - - - 60,000 60,000 2100.50.8901.3910.112 Transfers In From Federal CMAQ Fund 1,180,929 714,894 714,894 - - 714,894 2100.50.8901.3910.130 Transfers In From State Water Board Prop 1 454,100 303,782 303,782 - - 303,782 2100.50.8901.3910.132 Transfers In From HSIP Grant 26,540 9,000 9,000 - - 9,000 2100.50.8901.3910.133 Transfers In From ATP Grant 2,918,736 886,017 886,017 - - 886,017 2100.50.8901.3910.161 Transfers In From BHS HUD Revolving Loan Fund - 126,957 126,957 - - 126,957 2100.50.8901.3910.301 Transfers In CDBG - DR 106,221 - - - - - 2100.50.8901.3910.315 Transfers In From BHS CDBG 2015 Grant - 9,671 9,671 - - 9,671 2100.50.8901.3910.316 Transfers In From BHS CDBG 2016 Grant - 40,000 40,000 - - 40,000 2100.50.8901.3910.317 Transfers In From BHS CDBG 2017 Grant - 13,223 13,223 - - 13,223 2100.50.8901.3910.318 Transfers In From BHS CDBG 2018 Grant - 120,701 120,701 - - 120,701 2100.50.8901.3910.319 Transfers In From BHS CDBG 2019 Grant - 117,833 117,833 - - 117,833 2100.50.8901.3910.320 Transfers In From BHS CDBG 2020 Grant - 33,943 33,943 - - 33,943 2100.50.8901.3910.321 Transfers In From BHS CDBG 2021 Grant - 80,650 80,650 - - 80,650 2100.50.8901.3910.322 Transfers In From BHS CDBG 2022 Grant - 57,000 57,000 - - 57,000 2100.50.8901.3910.551 Transfer In from Impact Fees Drainage Fund - - - - 250,000 250,000 4,882,942 3,689,770 3,689,770 - 410,000 4,099,770
4,882,942 3,689,770 3,689,770 - 410,000 4,099,770
4,882,942 3,689,770 3,689,770 - 410,000 4,099,770
2100.50.8901.9377 Almond Multi-Modal Improvements 978,415 819,681 819,681 238,093 - 819,681 2100.50.8901.9380 Ponderosa Safe Routes to School 1,001,407 74,000 74,000 - - 74,000 REVENUES Total

EXPENSES
Department: 50 - CIP Programs
Program: 8901 - CIP Programs
Department: 50 - CIP Programs
Program: 8901 - CIP Programs
Program Total: 8901 - CIP Programs
Department Total: 50 - CIP Programs
1837
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2100.50.8901.9385 Paradise Gap Closure Complex 1,496,370 867,435 867,435 191,695 - 867,435 2100.50.8901.9389 Pentz Pathway Ph ll Project 606,045 187,450 187,450 23,867 100,000 287,450 2100.50.8901.9390 Skyway-Neal Bike-Ped Project 129,827 291,188 291,188 41,952 - 291,188 2100.50.8901.9391 Oliver Curve Pathway Project 187,213 236,256 236,256 4,202 - 236,256 2100.50.8901.9394 Downtown Sewer Environmental Study 896,593 303,782 303,782 348,969 - 303,782 2100.50.8901.9408 Systemic Intersection Safety Improvements 29,489 10,000 10,000 11,277 - 10,000 2100.50.8901.9416 Pavement Management Program Update 2022 150 - - - 60,000 60,000 2100.50.8901.9417 CDBG Sidewalk Improvements 2022 - HUD funding 150 899,978 899,978 126 (105,000) 794,978 2100.50.8901.9418 Stearns Road Emergency Culvert Replacement - - - 159,819 250,000 250,000 2100.50.8901.9420 Interim Safety Striping Project 2022 - - - - 105,000 105,000 5,325,659 3,689,770 3,689,770 1,019,999 410,000 4,099,770 5,325,659 3,689,770 3,689,770 1,019,999 410,000 4,099,770 5,325,659 3,689,770 3,689,770 1,019,999 410,000 4,099,770 4,882,942 3,689,770 3,689,770 - 410,000 4,099,770
5,325,659 3,689,770 3,689,770 1,019,999 410,000 4,099,770 (442,717) - - (1,019,999) - -
2105.65.4205.3910.010 Transfers In From General Fund 76,732 60,000 124,080 - - 124,080 2105.65.4205.3910.090 Transfers In From Camp Fire Recovery - 96,400 96,400 - - 96,400 2105.65.4205.3910.095 Transfers In From COVID-19 Fund - 820,000 1,302,561 - - 1,302,561 2105.65.4205.3910.130 Transfers In From State Water Board Prop 1 23,557 492,546 492,546 - - 492,546 2105.65.4205.3910.136 Transfers In From FEMA Grants FHMG 265,769 4,263,497 4,263,497 - - 4,263,497 2105.65.4205.3910.137 Transfers In EDA Grant 1,056,645 503,571 503,571 - - 503,571 2105.65.4205.3910.139 Transfers In From FHWA Funds 1,396,593 8,721,598 8,721,598 - - 8,721,598 2105.65.4205.3910.280 Transfers In From North Valley/Butte Strong 37,236 - - - - - 2105.65.4205.3910.298 Transfers In Grants Miscellaneous Federal - 615,000 615,000 - - 615,000 2105.65.4205.3910.299 Transfers In From Grants Misc One Time Fund 25,000 134,816 134,816 - - 134,816 2105.65.4205.3910.301 Transfers In CDBG - DR 376,923 4,027,284 4,027,284 - - 4,027,284 3,258,455 19,734,712 20,281,353 - - 20,281,353
3,258,455 19,734,712 20,281,353 - - 20,281,353
3,258,455 19,734,712 20,281,353 - - 20,281,353
Program Total: 8901 - CIP Programs
Department Total: 50 - CIP Programs
Department: 65 - Emergency Mngmt & Disaster Recov
Program: 4205 - Disaster Recovery
Department: 65 - Emergency Mngmt & Disaster Recov
Program: 4205 - Disaster Recovery
Program Total: 4205 - Disaster Recovery
Department Total: 65 - Emergency Mngmt & Disaster Recov REVENUES Total

EXPENSES
EXPENSES Total
Fund REVENUE Total: 2100 - CIP Fund
Fund EXPENSE Total: 2100 - CIP Fund
Fund Total: 2100 - CIP Fund
Fund: 2105 - Disaster Recovery Projects

REVENUES
1838
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2105.65.4205.7100 Building Resource Center (BRC) 12,627 50,000 50,000 - - 50,000 2105.65.4205.7105 Police Department Radios 86,749 - - - - - 2105.65.4205.7106 Portable and Mobile Police Radios - 711,400 711,400 - - 711,400 2105.65.4205.7200 Public Safety Power Shutoff Preparedness 30,829 30,829 30,829 - - 30,829 2105.65.4205.7301 On-System Culvert Replacement 652,748 122,856 122,856 2,055 - 122,856 2105.65.4205.7302 On-System Hardscape Replacement 552,629 10,000 10,000 12,331 - 10,000 2105.65.4205.7303 On-System Road Rehabilitation 418,498 9,840,586 9,840,586 2,683,586 - 9,840,586 2105.65.4205.7304 On-System Sign Replacement 18,236 274,200 274,200 1,678 - 274,200 2105.65.4205.7307 Neal Road Rehabilitation 41,956 - - - - - 2105.65.4205.7308 Storm Drain Master Plan 295,838 - - 94 - - 2105.65.4205.7309 Transportation Master Plan 1,056,645 503,571 503,571 60,365 - 503,571 2105.65.4205.7312 Category 4 Tree Removal 5,011 1,975,000 2,065,000 119,137 - 2,065,000 2105.65.4205.7313 Residential Ignition Resistant Program 104 137,337 137,337 - - 137,337 2105.65.4205.7314 Early Warning System 132 2,952,325 2,952,325 - - 2,952,325 2105.65.4205.7315 Hazardous Fuel Reduction Program 104 445,000 445,000 - - 445,000 2105.65.4205.7316 Defensible Space Code Enforcement 105 175,000 175,000 - - 175,000 2105.65.4205.7317 Reseeding Program 53,065 - - - - -
2105.65.4205.7320 SWRCB - Septic Grant (3 Years) 47,499 492,546 492,546 98,937 - 492,546 2105.65.4205.7321 Emergency Operations Plan Update 33,170 50,000 50,000 - - 50,000 2105.65.4205.7322 Long Term Recovery Plan Update 85,642 60,000 60,000 23,107 - 60,000 2105.65.4205.7323 California Resilience Challenge 2021 Grant 45,592 134,816 134,816 - - 134,816 2105.65.4205.7324 Restoration of Dispatch Services 7,920 820,000 1,276,641 180,044 - 1,276,641 3,445,099 18,785,466 19,332,107 3,181,334 - 19,332,107
3,445,099 18,785,466 19,332,107 3,181,334 - 19,332,107
3,445,099 18,785,466 19,332,107 3,181,334 - 19,332,107
3,258,455 19,734,712 20,281,353 - - 20,281,353
3,445,099 18,785,466 19,332,107 3,181,334 - 19,332,107
(186,644) 949,246 949,246 (3,181,334) - 949,246
Program Total: 4205 - Disaster Recovery
Department Total: 65 - Emergency Mngmt & Disaster Recov EXPENSES Total
Fund REVENUE Total: 2105 - Disaster Recovery Projects
Fund EXPENSE Total: 2105 - Disaster Recovery Projects
Fund Total: 2105 - Disaster Recovery Projects
1839
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2110.00.0000.3345.001 State Revenues - Other LTF - Local Transit Funds 226,714 731,640 731,640 - 100,000 831,640 2110.00.0000.3910.900 Transfers In From Transit Fund - 28,720 28,720 - - 28,720 226,714 760,360 760,360 - 100,000 860,360
226,714 760,360 760,360 - 100,000 860,360
226,714 760,360 760,360 - 100,000 860,360
2110.00.0000.5910.120 Transfers Out To State Gas Tax Fund 7,034 62,682 62,682 - - 62,682 7,034 62,682 62,682 - - 62,682
7,034 62,682 62,682 - - 62,682
2110.45.4743.5101 Salaries - Permanent 26,475 41,975 42,477 8,472 - 42,477 2110.45.4743.5105 Salaries - Overtime/FLSA 74 - - - - - 2110.45.4743.5106.100 Incentives & Admin Leave Administrative Leave 882 1,696 1,717 - - 1,717 2110.45.4743.5106.200 Incentives & Admin Leave Gym Reimbursement - - - 4 - - 2110.45.4743.5107 Car Allowance/Mileage 48 48 48 14 - 48 2110.45.4743.5109.101 Allowances Boot Allowance 10 20 20 40 - 20 2110.45.4743.5111 Medicare 400 634 642 124 - 642
2110.45.4743.5112.101 GASB 68 - Pension Expense PERS 5,124 8,110 8,232 5,466 - 8,232 2110.45.4743.5113 Worker's Compensation 1,099 6,966 7,069 2,309 - 7,069 2110.45.4743.5114.101 Health Insurance Medical 1,898 4,502 4,502 686 - 4,502 2110.45.4743.5114.102 Health Insurance Dental 196 - - 75 - - 2110.45.4743.5114.103 Health Insurance Vision 16 - - 6 - - 2110.45.4743.5115 Unemployment Compensation 173 - - 62 - - 2110.45.4743.5116.101 Life and Disability Insurance Life & Disab. 65 387 415 21 - 415 2110.45.4743.5116.102 Life and Disability Insurance Long Term/Short Term Disability 259 - - 91 - -
2110.45.4743.5216.100 Communications General Services 173 105 105 58 - 105 2110.45.4743.5910.010 Transfers Out To General Fund 5,091 7,568 7,568 - - 7,568 2110.45.4743.5910.100 Transfers Out To Capital Projects 196,416 676,099 676,099 - 100,000 776,099 238,398 748,110 748,894 17,425 100,000 848,894
238,398 748,110 748,894 17,425 100,000 848,894
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Department: 45 - Public Works
Program: 4743 - Streets and Roads
Program Total: 4743 - Streets and Roads
Department Total: 45 - Public Works
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Fund: 2110 - Transportation Fund

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
1840
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
245,431 810,792 811,576 17,425 100,000 911,576
226,714 760,360 760,360 - 100,000 860,360
245,431 810,792 811,576 17,425 100,000 911,576
(18,717) (50,432) (51,216) (17,425) - (51,216)
2112.00.0000.3310.200 Federal Funding CIP Funding 1,213,132 742,097 742,097 - - 742,097 1,213,132 742,097 742,097 - - 742,097
1,213,132 742,097 742,097 - - 742,097
1,213,132 742,097 742,097 - - 742,097
2112.00.0000.5910.100 Transfers Out To Capital Projects 1,180,929 714,894 714,894 - - 714,894 2112.00.0000.5910.120 Transfers Out To State Gas Tax Fund 32,203 27,203 27,203 - - 27,203 1,213,132 742,097 742,097 - - 742,097
1,213,132 742,097 742,097 - - 742,097
1,213,132 742,097 742,097 - - 742,097
1,213,132 742,097 742,097 - - 742,097
1,213,132 742,097 742,097 - - 742,097
- - - - - -
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 2112 - Fed CMAQ Congest Mgmt Air Qual Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
EXPENSES Total
Fund REVENUE Total: 2110 - Transportation Fund
Fund EXPENSE Total: 2110 - Transportation Fund
Fund Total: 2110 - Transportation Fund
Fund: 2112 - Fed CMAQ Congest Mgmt Air Qual

REVENUES
Fund EXPENSE Total: 2112 - Fed CMAQ Congest Mgmt Air Qual Fund Total: 2112 - Fed CMAQ Congest Mgmt Air Qual
1841
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2120.45.4750.3355.001 State gas Tax Section 2106 114,154 22,872 22,872 5,679 - 22,872 2120.45.4750.3355.002 State gas Tax Section 2107 237,327 60,500 60,500 10,058 - 60,500 2120.45.4750.3355.003 State gas Tax Section 2107.5 6,000 2,000 2,000 2,000 - 2,000 2120.45.4750.3355.005 State gas Tax Section 2105 189,271 39,000 39,000 7,230 - 39,000 2120.45.4750.3355.006 State gas Tax RSTP Regional Surface Trans Prog 187,312 150,000 150,000 - - 150,000 2120.45.4750.3355.007 State gas Tax Section 2103 257,681 59,500 59,500 13,559 - 59,500 2120.45.4750.3355.008 State gas Tax Section 2032 453,973 137,500 137,500 24,357 - 137,500 2120.45.4750.3410.150 Administrative Services Late Fees 198 - - - - - 2120.45.4750.3610.100 Interest Revenue Investments - 200 200 - - 200 2120.45.4750.3901.100 Refunds and Reimbursements Miscellaneous 53,465 10,000 10,000 10,842 - 10,000 2120.45.4750.3902.100 Miscellaneous Revenue General - 913,716 913,716 - - 913,716 2120.45.4750.3910.010 Transfers In From General Fund - - - - 144,000 144,000 2120.45.4750.3910.090 Transfers In From Camp Fire Recovery 32,149 41,539 41,539 - - 41,539 2120.45.4750.3910.110 Transfers In From Local Transportation Fund 7,034 62,682 62,682 - - 62,682 2120.45.4750.3910.112 Transfers In From Federal CMAQ Fund 32,203 27,203 27,203 - - 27,203 2120.45.4750.3910.130 Transfers In From State Water Board Prop 1 29,903 76,916 76,916 - - 76,916 2120.45.4750.3910.132 Transfers In From HSIP Grant 8,927 36,764 36,764 - - 36,764 2120.45.4750.3910.133 Transfers In From ATP Grant 43,434 33,561 33,561 - - 33,561 2120.45.4750.3910.136 Transfers In From FEMA Grants FHMG 15,695 - - - - - 2120.45.4750.3910.137 Transfers In EDA Grant 52,251 30,532 30,532 - - 30,532 2120.45.4750.3910.138 Transfer In from USDA Fund - - - - 156,000 156,000 2120.45.4750.3910.139 Transfers In From FHWA Funds 60,919 63,479 63,479 - - 63,479 2120.45.4750.3910.301 Transfers In CDBG - DR 24,132 19,911 204,381 - - 204,381 1,806,026 1,787,875 1,972,345 73,724 300,000 2,272,345
1,806,026 1,787,875 1,972,345 73,724 300,000 2,272,345
1,806,026 1,787,875 1,972,345 73,724 300,000 2,272,345
2120.45.4750.5101 Salaries - Permanent 563,602 736,400 854,374 162,597 - 854,374 2120.45.4750.5103.101 Differential Pay On Call 23,755 23,500 23,500 6,535 - 23,500 2120.45.4750.5103.102 Differential Pay Out of Class 556 750 750 284 - 750 2120.45.4750.5105 Salaries - Overtime/FLSA 8,843 8,450 8,450 2,576 - 8,450 2120.45.4750.5106.100 Incentives & Admin Leave Administrative Leave 11,927 17,381 22,082 - - 22,082 Program Total: 4750 - Public Works - Streets Maint.

Department Total: 45 - Public Works
REVENUES Total

EXPENSES
Department: 45 - Public Works
Program: 4750 - Public Works - Streets Maint.

Fund: 2120 - State Gas Tax

REVENUES
Department: 45 - Public Works
Program: 4750 - Public Works - Streets Maint.
1842
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2120.45.4750.5106.200 Incentives & Admin Leave Gym Reimbursement - 360 360 32 - 360 2120.45.4750.5107 Car Allowance/Mileage 1,388 1,392 1,392 393 - 1,392 2120.45.4750.5109.101 Allowances Boot Allowance 3,291 3,420 3,520 3,040 - 3,520 2120.45.4750.5111 Medicare 8,651 11,448 13,228 2,464 - 13,228 2120.45.4750.5112.101 GASB 68 - Pension Expense PERS 114,456 143,910 172,624 95,370 - 172,624 2120.45.4750.5113 Worker's Compensation 96,592 132,203 144,894 43,817 - 144,894 2120.45.4750.5114.101 Health Insurance Medical 53,933 92,735 109,636 15,999 - 109,636 2120.45.4750.5114.102 Health Insurance Dental 6,358 - - 1,816 - - 2120.45.4750.5114.103 Health Insurance Vision 589 - - 171 - - 2120.45.4750.5115 Unemployment Compensation 3,782 - - 1,228 - - 2120.45.4750.5116.101 Life and Disability Insurance Life & Disab. 1,935 8,557 10,166 560 - 10,166 2120.45.4750.5116.102 Life and Disability Insurance Long Term/Short Term Disability 3,779 - - 1,203 - -
2120.45.4750.5119.100 Retiree Costs Medical Insurance 21,367 22,307 22,307 5,485 - 22,307 2120.45.4750.5201.100 Office Supplies General 281 300 300 11 - 300 2120.45.4750.5202.100 Operating Supplies General 11,485 4,250 4,250 2,622 - 4,250 2120.45.4750.5203.100 Repairs and Maint Supplies General 94,668 94,000 94,000 54,985 - 94,000 2120.45.4750.5209.101 Auto Fuel Expense Town Vehicles 32,711 27,500 27,500 5,957 - 27,500 2120.45.4750.5211.135 Utilities Water and Sewer 264 264 264 142 - 264 2120.45.4750.5211.137 Utilities Electric and Gas 41,467 34,800 34,800 11,740 - 34,800 2120.45.4750.5213.100 Professional/Contract Services General 23,553 16,500 16,500 437 - 16,500 2120.45.4750.5214.100 Repair and Maint Service General 111,622 94,800 94,800 16,528 - 94,800 2120.45.4750.5215.100 Rents and Leases Miscellaneous 8,412 8,000 8,000 1,732 - 8,000 2120.45.4750.5215.131 Rents and Leases Street Maintenance Equipment 69,959 5,000 5,000 8,533 - 5,000 2120.45.4750.5216.100 Communications General Services 5,920 43,034 43,034 1,377 - 43,034 2120.45.4750.5218.100 Advertising General 123 100 100 163 - 100 2120.45.4750.5220.100 Employee Development General 5,084 5,000 5,000 4,024 - 5,000 2120.45.4750.5223.101 Meals and Refreshments Employee Meals-MOU Overtime 585 500 500 30 - 500 2120.45.4750.5223.105 Meals and Refreshments Emergencies and Meetings - - - 30 - - 2120.45.4750.5304 Furniture & Equipment 156,573 20,500 20,500 7,648 - 20,500 2120.45.4750.5305 Vehicles 307,682 - - - 300,000 300,000 2120.45.4750.5501 Debt Service Payment - Principal 8,376 5,367 5,367 2,147 - 5,367 2120.45.4750.5910.010 Transfers Out To General Fund 353,824 225,147 225,147 - - 225,147 2120.45.4750.5910.100 Transfers Out To Capital Projects Fund - - - - 60,000 60,000 2,157,395 1,787,875 1,972,345 461,677 360,000 2,332,345 2,157,395 1,787,875 1,972,345 461,677 360,000 2,332,345 2,157,395 1,787,875 1,972,345 461,677 360,000 2,332,345 1,806,026 1,787,875 1,972,345 73,724 300,000 2,272,345
Program Total: 4750 - Public Works - Streets Maint.

Department Total: 45 - Public Works
EXPENSES Total
Fund REVENUE Total: 2120 - State Gas Tax
1843
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2,157,395 1,787,875 1,972,345 461,677 360,000 2,332,345 (351,368) - - (387,952) (60,000) (60,000)
2130.00.0000.3310.200 Federal Funding CIP Funding (13,792) - - - - - 2130.00.0000.3340.200 State Funding - Grants CIP Funding 501,815 883,244 883,244 - - 883,244 488,023 883,244 883,244 - - 883,244
488,023 883,244 883,244 - - 883,244
488,023 883,244 883,244 - - 883,244
2130.00.0000.5910.010 Transfers Out To General Fund 97 - - - - - 2130.00.0000.5910.030 Transfers Out To Development Services Fund 3,690 - - - - - 2130.00.0000.5910.100 Transfers Out To Capital Projects 454,100 303,782 303,782 - - 303,782 2130.00.0000.5910.105 Transfers Out To Camp Fire Recovery Projects 23,557 492,546 492,546 - - 492,546 2130.00.0000.5910.120 Transfers Out To State Gas Tax Fund 29,903 76,916 76,916 - - 76,916 2130.00.0000.5910.160 Transfers Out To BHS Development Svcs Fund 9,412 10,000 10,000 - - 10,000 520,759 883,244 883,244 - - 883,244
520,759 883,244 883,244 - - 883,244
520,759 883,244 883,244 - - 883,244
488,023 883,244 883,244 - - 883,244
520,759 883,244 883,244 - - 883,244
(32,737) - - - - -
2132.00.0000.3310.200 Federal Funding CIP Funding 35,467 45,764 45,764 - - 45,764 35,467 45,764 45,764 - - 45,764
35,467 45,764 45,764 - - 45,764
35,467 45,764 45,764 - - 45,764
Fund EXPENSE Total: 2120 - State Gas Tax
Fund Total: 2120 - State Gas Tax
EXPENSES Total
Fund REVENUE Total: 2130 - State Water Board Prop 1 Grant Fund EXPENSE Total: 2130 - State Water Board Prop 1 Grant Fund Total: 2130 - State Water Board Prop 1 Grant
Fund: 2132 - HSIP Highway Safety Imp Prog.

REVENUES
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Fund: 2130 - State Water Board Prop 1 Grant

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
1844
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2132.00.0000.5910.100 Transfers Out To Capital Projects 26,540 9,000 9,000 - - 9,000 2132.00.0000.5910.120 Transfers Out To State Gas Tax Fund 8,927 36,764 36,764 - - 36,764 35,467 45,764 45,764 - - 45,764
35,467 45,764 45,764 - - 45,764
35,467 45,764 45,764 - - 45,764
35,467 45,764 45,764 - - 45,764
35,467 45,764 45,764 - - 45,764
- - - - - -
2133.00.0000.3340.200 State Funding - Grants CIP Funding 2,962,170 919,578 919,578 - - 919,578 2,962,170 919,578 919,578 - - 919,578
2,962,170 919,578 919,578 - - 919,578
2,962,170 919,578 919,578 - - 919,578
Fund EXPENSE Total: 2132 - HSIP Highway Safety Imp Prog.

Fund Total: 2132 - HSIP Highway Safety Imp Prog.

Fund: 2133 - Active Transportation Program

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 2132 - HSIP Highway Safety Imp Prog.

Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total
1845
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2133.00.0000.5910.100 Transfers Out To Capital Projects 2,918,736 886,017 886,017 - - 886,017 2133.00.0000.5910.120 Transfers Out To State Gas Tax Fund 43,434 33,561 33,561 - - 33,561 2,962,170 919,578 919,578 - - 919,578
2,962,170 919,578 919,578 - - 919,578
2,962,170 919,578 919,578 - - 919,578
2,962,170 919,578 919,578 - - 919,578
2,962,170 919,578 919,578 - - 919,578
- - - - - -
2136.00.0000.3310.099 Federal Funding Federal Grants 306,511 4,639,685 4,639,685 - - 4,639,685 306,511 4,639,685 4,639,685 - - 4,639,685
306,511 4,639,685 4,639,685 - - 4,639,685
306,511 4,639,685 4,639,685 - - 4,639,685
2136.00.0000.5910.090 Transfers Out To Camp Fire 2018 Recovery 13,741 376,188 376,188 - - 376,188 2136.00.0000.5910.105 Transfers Out To Camp Fire Recovery Projects 265,769 4,263,497 4,263,497 - - 4,263,497 2136.00.0000.5910.120 Transfers Out To State Gas Tax Fund 15,695 - - - - - 2136.00.0000.5910.160 Transfers Out To BHS Development Svcs Fund 67 - - - - - 295,272 4,639,685 4,639,685 - - 4,639,685
295,272 4,639,685 4,639,685 - - 4,639,685
295,272 4,639,685 4,639,685 - - 4,639,685
306,511 4,639,685 4,639,685 - - 4,639,685
295,272 4,639,685 4,639,685 - - 4,639,685
11,239 - - - - -
2137.65.4205.3310.099 Federal Funding Federal Grants 1,205,401 534,103 534,103 - - 534,103 Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 2133 - Active Transportation Program Fund EXPENSE Total: 2133 - Active Transportation Program Fund Total: 2133 - Active Transportation Program

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 2136 - FEMA Grants FHMG
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Fund: 2136 - FEMA Grants FHMG

REVENUES
Fund EXPENSE Total: 2136 - FEMA Grants FHMG
Fund Total: 2136 - FEMA Grants FHMG
Fund: 2137 - Economic Development Admin (EDA)

REVENUES
Department: 65 - Emergency Mngmt & Disaster Recov
Program: 4205 - Disaster Recovery
1846
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1,205,401 534,103 534,103 - - 534,103
1,205,401 534,103 534,103 - - 534,103
1,205,401 534,103 534,103 - - 534,103
2137.65.4205.5910.105 Transfers Out To Camp Fire Recovery Projects 1,056,645 503,571 503,571 - - 503,571 2137.65.4205.5910.120 Transfers Out To State Gas Tax Fund 52,251 30,532 30,532 - - 30,532 1,108,896 534,103 534,103 - - 534,103
1,108,896 534,103 534,103 - - 534,103
1,108,896 534,103 534,103 - - 534,103
1,205,401 534,103 534,103 - - 534,103
1,108,896 534,103 534,103 - - 534,103
96,505 - - - - -
2138.00.0000.3310.099 Federal Funding Federal Grants 49,220 131,500 131,500 - 189,500 321,000 49,220 131,500 131,500 - 189,500 321,000
49,220 131,500 131,500 - 189,500 321,000
49,220 131,500 131,500 - 189,500 321,000
2138.00.0000.5910.010 Transfers Out To General Fund - 70,500 70,500 - 33,500 104,000 2138.00.0000.5910.070 Transfers Out To Animal Control Fund - 61,000 61,000 - - 61,000 2138.00.0000.5910.120 Transfers Out to Gas Tax Fund - - - - 156,000 156,000 - 131,500 131,500 - 189,500 321,000
- 131,500 131,500 - 189,500 321,000
- 131,500 131,500 - 189,500 321,000
49,220 131,500 131,500 - 189,500 321,000
- 131,500 131,500 - 189,500 321,000
49,220 - - - - -
Program Total: 4205 - Disaster Recovery
Department Total: 65 - Emergency Mngmt & Disaster Recov EXPENSES Total
Fund REVENUE Total: 2137 - Economic Development Admin (EDA) Fund EXPENSE Total: 2137 - Economic Development Admin (EDA) Fund Total: 2137 - Economic Development Admin (EDA)
Program Total: 4205 - Disaster Recovery
Department Total: 65 - Emergency Mngmt & Disaster Recov REVENUES Total

EXPENSES
Department: 65 - Emergency Mngmt & Disaster Recov
Program: 4205 - Disaster Recovery
EXPENSES Total
Fund REVENUE Total: 2138 - USDA
Fund EXPENSE Total: 2138 - USDA
Fund Total: 2138 - USDA
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Fund: 2138 - USDA

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
1847
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2139.00.0000.3310.200 Federal Funding CIP Funding 1,724,992 8,785,077 8,785,077 - - 8,785,077 1,724,992 8,785,077 8,785,077 - - 8,785,077
1,724,992 8,785,077 8,785,077 - - 8,785,077
1,724,992 8,785,077 8,785,077 - - 8,785,077
2139.00.0000.5910.105 Transfers Out To Camp Fire Recovery Projects 1,396,593 8,721,598 8,721,598 - - 8,721,598 2139.00.0000.5910.120 Transfers Out To State Gas Tax Fund 60,919 63,479 63,479 - - 63,479 1,457,512 8,785,077 8,785,077 - - 8,785,077
1,457,512 8,785,077 8,785,077 - - 8,785,077
1,457,512 8,785,077 8,785,077 - - 8,785,077
1,724,992 8,785,077 8,785,077 - - 8,785,077
1,457,512 8,785,077 8,785,077 - - 8,785,077
267,480 - - - - -
2160.55.4800.3902.100 Miscellaneous Revenue General 225 - - 75 - - 2160.55.4800.3910.130 Transfers In From State Water Board Prop 1 9,412 10,000 10,000 - - 10,000 2160.55.4800.3910.136 Transfers In From FEMA Grants FHMG 67 - - - - - 2160.55.4800.3910.162 Transfers In From BHS Home Loan Repay Fund - 35,000 35,000 - - 35,000 2160.55.4800.3910.163 Transfers In From BHS Cal Home Loan Fund - 22,500 22,500 - - 22,500 2160.55.4800.3910.297 Transfers In Grants Miscellaneous State 29,313 - - - - - 2160.55.4800.3910.301 Transfers In CDBG - DR 1,058 60,000 60,000 - - 60,000 2160.55.4800.3910.420 Transfers In From 2020 CalHome DA Grant - 358,390 358,390 - - 358,390 40,075 485,890 485,890 75 - 485,890
40,075 485,890 485,890 75 - 485,890
40,075 485,890 485,890 75 - 485,890
Fund: 2139 - FHWA - Federal-Aid Highway Act

REVENUES
Fund EXPENSE Total: 2139 - FHWA - Federal-Aid Highway Act Fund Total: 2139 - FHWA - Federal-Aid Highway Act
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 2139 - FHWA - Federal-Aid Highway Act Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Fund: 2160 - Business & Housing Services

REVENUES
Department: 55 - Business & Housing Services
Program: 4800 - Development Services
Program Total: 4800 - Development Services
Department Total: 55 - Business & Housing Services
REVENUES Total

EXPENSES
Department: 55 - Business & Housing Services
Program: 4800 - Development Services
1848
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2160.55.4800.5101 Salaries - Permanent 255,739 270,688 270,688 72,844 - 270,688 2160.55.4800.5105 Salaries - Overtime/FLSA 389 - - - - - 2160.55.4800.5106.100 Incentives & Admin Leave Administrative Leave 5,351 5,575 5,575 - - 5,575 2160.55.4800.5107 Car Allowance/Mileage 116 120 120 22 - 120 2160.55.4800.5111 Medicare 3,658 3,982 3,982 1,009 - 3,982 2160.55.4800.5112.101 GASB 68 - Pension Expense PERS 51,896 53,216 53,216 35,597 - 53,216 2160.55.4800.5113 Worker's Compensation 1,741 1,408 1,408 467 - 1,408 2160.55.4800.5114.101 Health Insurance Medical 33,230 43,422 43,422 10,359 - 43,422 2160.55.4800.5114.102 Health Insurance Dental 4,517 - - 1,347 - - 2160.55.4800.5114.103 Health Insurance Vision 323 - - 94 - - 2160.55.4800.5115 Unemployment Compensation 1,610 - - 507 - - 2160.55.4800.5116.101 Life and Disability Insurance Life & Disab. 805 3,070 3,070 234 - 3,070 2160.55.4800.5116.102 Life and Disability Insurance Long Term/Short Term Disability 424 - - 160 - -
2160.55.4800.5199.130 Other Payroll Expenses Interfund Payroll Transfers (22,291) (82,880) (82,880) - - (82,880) 2160.55.4800.5201.100 Office Supplies General 256 1,000 1,000 16 - 1,000 2160.55.4800.5202.100 Operating Supplies General 312 1,500 1,500 25 - 1,500 2160.55.4800.5209.105 Auto Fuel Expense Employee Personal Vehicle Use 71 500 500 - - 500 2160.55.4800.5210.100 Postage General 332 400 400 44 - 400 2160.55.4800.5213.100 Professional/Contract Services General 68,862 30,000 30,000 10,557 - 30,000 2160.55.4800.5214.100 Repair and Maint Service General 1,500 1,500 1,500 - - 1,500 2160.55.4800.5218.100 Advertising General 114 - - - - - 2160.55.4800.5219.100 Printing General 48 300 300 (5) - 300 2160.55.4800.5910.010 Transfers Out To General Fund 76,274 73,096 73,096 - - 73,096 485,277 406,897 406,897 133,278 - 406,897
485,277 406,897 406,897 133,278 - 406,897
485,277 406,897 406,897 133,278 - 406,897
40,075 485,890 485,890 75 - 485,890
485,277 406,897 406,897 133,278 - 406,897
(445,202) 78,993 78,993 (133,203) - 78,993
EXPENSES Total
Fund REVENUE Total: 2160 - Business & Housing Services
Fund EXPENSE Total: 2160 - Business & Housing Services
Fund Total: 2160 - Business & Housing Services
Program Total: 4800 - Development Services
Department Total: 55 - Business & Housing Services
1849
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2162.55.0000.3905.001 BHS Loan Payments Program Income 232,235 40,000 40,000 33,751 - 40,000 2162.55.0000.3905.002 BHS Loan Payments Recapture Income - 40,000 40,000 - - 40,000 232,235 80,000 80,000 33,751 - 80,000
232,235 80,000 80,000 33,751 - 80,000
232,235 80,000 80,000 33,751 - 80,000
2162.55.0000.5910.160 Transfers Out To BHS Development Svcs Fund - 35,000 35,000 - - 35,000 - 35,000 35,000 - - 35,000
2162.55.4802.5290.290 Loan Programs BHS Loans 31,460 40,000 40,000 - - 40,000 31,460 40,000 40,000 - - 40,000
2162.55.4808.5290.290 Loan Programs BHS Loans 120,000 40,000 40,000 126,850 - 40,000 120,000 40,000 40,000 126,850 - 40,000
151,460 115,000 115,000 126,850 - 115,000
151,460 115,000 115,000 126,850 - 115,000
232,235 80,000 80,000 33,751 - 80,000
151,460 115,000 115,000 126,850 - 115,000
80,775 (35,000) (35,000) (93,099) - (35,000)
2163.55.0000.3905.001 BHS Loan Payments Program Income 229,140 50,000 50,000 9,117 - 50,000 229,140 50,000 50,000 9,117 - 50,000
229,140 50,000 50,000 9,117 - 50,000
229,140 50,000 50,000 9,117 - 50,000
2163.55.0000.5910.160 Transfers Out To BHS Development Svcs Fund - 22,500 22,500 - - 22,500 Department: 55 - Business & Housing Services
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 55 - Business & Housing Services
REVENUES Total

EXPENSES
Fund: 2162 - BHS Home Loan Fund

REVENUES
Fund: 2163 - BHS CAL-HOME Loan Fund

REVENUES
Department: 55 - Business & Housing Services
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 55 - Business & Housing Services
Program Total: 4808 - First Time Home Buyer Program
Department Total: 55 - Business & Housing Services
EXPENSES Total
Fund REVENUE Total: 2162 - BHS Home Loan Fund
Fund EXPENSE Total: 2162 - BHS Home Loan Fund
Fund Total: 2162 - BHS Home Loan Fund
Department: 55 - Business & Housing Services
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Program: 4802 - Rebuild with Held Funds
Program Total: 4802 - Rebuild with Held Funds
Program: 4808 - First Time Home Buyer Program
REVENUES Total

EXPENSES
Department: 55 - Business & Housing Services
Program: 0000 - Non Program Activity
1850
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
- 22,500 22,500 - - 22,500
2163.55.4802.5290.290 Loan Programs BHS Loans 25,125 - - - - - 25,125 - - - - -
2163.55.4805.5290.290 Loan Programs BHS Loans 158,232 222,500 222,500 9,953 - 222,500 158,232 222,500 222,500 9,953 - 222,500
2163.55.4808.5290.290 Loan Programs BHS Loans 40,000 - - - - - 40,000 - - - - -
223,357 245,000 245,000 9,953 - 245,000
223,357 245,000 245,000 9,953 - 245,000
229,140 50,000 50,000 9,117 - 50,000
223,357 245,000 245,000 9,953 - 245,000
5,783 (195,000) (195,000) (837) - (195,000)
2204.30.0000.3340.300 State Funding - Grants Police Grants 161,301 170,000 170,000 72,690 - 170,000 161,301 170,000 170,000 72,690 - 170,000
161,301 170,000 170,000 72,690 - 170,000
161,301 170,000 170,000 72,690 - 170,000
2204.30.4520.5199.130 Other Payroll Expenses Interfund Payroll Transfers 86,985 93,478 93,478 - - 93,478 2204.30.4520.5501 Debt Service Payment - Principal 24,064 - - - - - 111,049 93,478 93,478 - - 93,478
2204.30.4530.5199.130 Other Payroll Expenses Interfund Payroll Transfers 61,358 66,785 66,785 - - 66,785 61,358 66,785 66,785 - - 66,785
172,407 160,263 160,263 - - 160,263
172,407 160,263 160,263 - - 160,263
161,301 170,000 170,000 72,690 - 170,000
172,407 160,263 160,263 - - 160,263
(11,106) 9,737 9,737 72,690 - 9,737
EXPENSES Total
Fund REVENUE Total: 2163 - BHS CAL-HOME Loan Fund
Fund EXPENSE Total: 2163 - BHS CAL-HOME Loan Fund
Fund Total: 2163 - BHS CAL-HOME Loan Fund
Fund: 2204 - State SLESF Grant

REVENUES
Program Total: 4802 - Rebuild with Held Funds
Program: 4805 - Housing Rehab
Program Total: 4805 - Housing Rehab
Program: 4808 - First Time Home Buyer Program
Program Total: 4808 - First Time Home Buyer Program
Department Total: 55 - Business & Housing Services
Program Total: 0000 - Non Program Activity
Program: 4802 - Rebuild with Held Funds
EXPENSES Total
Fund REVENUE Total: 2204 - State SLESF Grant
Fund EXPENSE Total: 2204 - State SLESF Grant
Fund Total: 2204 - State SLESF Grant
Department: 30 - Police
Program: 4520 - Police Operations
Program Total: 4520 - Police Operations
Program: 4530 - Public Safety Communications
Program Total: 4530 - Public Safety Communications
Department Total: 30 - Police
Department: 30 - Police
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 30 - Police
REVENUES Total

EXPENSES
1851
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2298.00.0000.3310.099 Federal Funding Federal Grants - 615,000 615,000 - - 615,000 - 615,000 615,000 - - 615,000
- 615,000 615,000 - - 615,000
- 615,000 615,000 - - 615,000
2298.00.0000.5910.105 Transfers Out To Camp Fire Recovery Projects - 615,000 615,000 - - 615,000 - 615,000 615,000 - - 615,000
- 615,000 615,000 - - 615,000
- 615,000 615,000 - - 615,000
- 615,000 615,000 - - 615,000
- 615,000 615,000 - - 615,000
- - - - - -
2299.00.0000.3345.200 State Revenues - Other Miscellaneous - 134,816 134,816 - - 134,816 2299.00.0000.3650.100 Donations Private Sources 115,204 - - - - - 115,204 134,816 134,816 - - 134,816
115,204 134,816 134,816 - - 134,816
115,204 134,816 134,816 - - 134,816
2299.00.0000.5910.105 Transfers Out To Camp Fire Recovery Projects 25,000 134,816 134,816 - - 134,816 25,000 134,816 134,816 - - 134,816
25,000 134,816 134,816 - - 134,816
25,000 134,816 134,816 - - 134,816
115,204 134,816 134,816 - - 134,816
25,000 134,816 134,816 - - 134,816
90,204 - - - - -
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Fund: 2298 - Grants Miscellaneous Federal

REVENUES
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Fund EXPENSE Total: 2298 - Grants Miscellaneous Federal Fund Total: 2298 - Grants Miscellaneous Federal
Fund: 2299 - Grants Miscellaneous One Time

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 2298 - Grants Miscellaneous Federal Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 2299 - Grants Miscellaneous One Time Fund EXPENSE Total: 2299 - Grants Miscellaneous One Time Fund Total: 2299 - Grants Miscellaneous One Time
1852
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2301.55.4812.3310.099 Federal Funding Federal Grants 95,286 260,000 260,000 - - 260,000 95,286 260,000 260,000 - - 260,000
95,286 260,000 260,000 - - 260,000
2301.65.4205.3310.099 Federal Funding Federal Grants - 5,207,993 5,207,993 - - 5,207,993 - 5,207,993 5,207,993 - - 5,207,993
- 5,207,993 5,207,993 - - 5,207,993
95,286 5,467,993 5,467,993 - - 5,467,993
2301.55.4812.5199.130 Other Payroll Expenses Interfund Payroll Transfers 22,291 200,000 200,000 - - 200,000 2301.55.4812.5213.100 Professional/Contract Services General 91,255 - - - - - 2301.55.4812.5218.100 Advertising General 354 - - - - - 2301.55.4812.5910.160 Transfers Out To BHS Development Svcs Fund 1,036 60,000 60,000 - - 60,000 114,936 260,000 260,000 - - 260,000
114,936 260,000 260,000 - - 260,000
2301.65.4205.5213.100 Professional/Contract Services General 4,874 - - - - - 2301.65.4205.5910.090 Transfers Out To Camp Fire 2018 Recovery 4,580 309,511 309,511 - - 309,511 2301.65.4205.5910.100 Transfers Out To Capital Projects 106,221 - - - - - 2301.65.4205.5910.105 Transfers Out To Camp Fire Recovery Projects 376,923 4,027,284 4,027,284 - - 4,027,284 2301.65.4205.5910.120 Transfers Out To State Gas Tax Fund 24,132 19,911 204,381 - - 204,381 2301.65.4205.5910.160 Transfers Out To BHS Development Svcs Fund 22 - - - - - 516,753 4,356,706 4,541,176 - - 4,541,176
516,753 4,356,706 4,541,176 - - 4,541,176
631,688 4,616,706 4,801,176 - - 4,801,176
95,286 5,467,993 5,467,993 - - 5,467,993
631,688 4,616,706 4,801,176 - - 4,801,176
(536,403) 851,287 666,817 - - 666,817
Department: 65 - Emergency Mngmt & Disaster Recov
Program: 4205 - Disaster Recovery
Program Total: 4205 - Disaster Recovery
Department Total: 65 - Emergency Mngmt & Disaster Recov REVENUES Total

EXPENSES
Fund: 2301 - CDBG-DR

REVENUES
Department: 55 - Business & Housing Services
Program: 4812 - Multi-Family Homes
Program Total: 4812 - Multi-Family Homes
Department Total: 55 - Business & Housing Services
Program Total: 4205 - Disaster Recovery
Department Total: 65 - Emergency Mngmt & Disaster Recov EXPENSES Total
Fund REVENUE Total: 2301 - CDBG-DR
Fund EXPENSE Total: 2301 - CDBG-DR
Fund Total: 2301 - CDBG-DR
Department: 55 - Business & Housing Services
Program: 4812 - Multi-Family Homes
Program Total: 4812 - Multi-Family Homes
Department Total: 55 - Business & Housing Services
Department: 65 - Emergency Mngmt & Disaster Recov
Program: 4205 - Disaster Recovery
1853
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2420.55.0000.3340.100 State Funding - Grants BHS State Reimbursements - 2,707,630 2,707,630 - - 2,707,630 - 2,707,630 2,707,630 - - 2,707,630
- 2,707,630 2,707,630 - - 2,707,630
- 2,707,630 2,707,630 - - 2,707,630
2420.55.4805.5290.290 Loan Programs BHS Loans 2,082,352 2,250,000 2,250,000 711,935 - 2,250,000 2420.55.4805.5910.160 Transfers Out To BHS Development Svcs Fund - 358,390 358,390 - - 358,390 2,082,352 2,608,390 2,608,390 711,935 - 2,608,390
2,082,352 2,608,390 2,608,390 711,935 - 2,608,390
2,082,352 2,608,390 2,608,390 711,935 - 2,608,390
- 2,707,630 2,707,630 - - 2,707,630
2,082,352 2,608,390 2,608,390 711,935 - 2,608,390
(2,082,352) 99,240 99,240 (711,935) - 99,240
2510.45.0000.3405.100 Impact Fees Development Impact Fees 13,940 14,000 14,000 4,641 - 14,000 2510.45.0000.3610.100 Interest Revenue Investments - 1,660 1,660 - - 1,660 13,940 15,660 15,660 4,641 - 15,660
13,940 15,660 15,660 4,641 - 15,660
13,940 15,660 15,660 4,641 - 15,660
13,940 15,660 15,660 4,641 - 15,660
13,940 15,660 15,660 4,641 - 15,660
2520.45.0000.3405.100 Impact Fees Development Impact Fees 1,204 1,150 1,150 393 - 1,150 1,204 1,150 1,150 393 - 1,150
Fund: 2420 - BHS 2020 CalHome DA Grant

REVENUES
Fund EXPENSE Total: 2420 - BHS 2020 CalHome DA Grant
Fund Total: 2420 - BHS 2020 CalHome DA Grant
Department: 55 - Business & Housing Services
Program: 4805 - Housing Rehab
Program Total: 4805 - Housing Rehab
Department Total: 55 - Business & Housing Services
EXPENSES Total
Fund REVENUE Total: 2420 - BHS 2020 CalHome DA Grant
Department: 55 - Business & Housing Services
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 55 - Business & Housing Services
REVENUES Total

EXPENSES
REVENUES Total
Fund REVENUE Total: 2510 - Impact Fees Road Improvements Fund EXPENSE Total: 2510 - Impact Fees Road Improvements Fund Total: 2510 - Impact Fees Road Improvements
Fund: 2520 - Impact Fees Signal Improvements

REVENUES
Fund: 2510 - Impact Fees Road Improvements

REVENUES
Department: 45 - Public Works
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 45 - Public Works
Department: 45 - Public Works
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
1854
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1,204 1,150 1,150 393 - 1,150
1,204 1,150 1,150 393 - 1,150
1,204 1,150 1,150 393 - 1,150
1,204 1,150 1,150 393 - 1,150
2521.45.0000.3610.100 Interest Revenue Investments - 25 25 - - 25 - 25 25 - - 25
- 25 25 - - 25
- 25 25 - - 25
- 25 25 - - 25
- 25 25 - - 25
2540.30.0000.3405.100 Impact Fees Development Impact Fees 2,176 2,300 2,300 711 - 2,300 2540.30.0000.3610.100 Interest Revenue Investments - 200 200 - - 200 2,176 2,500 2,500 711 - 2,500
2,176 2,500 2,500 711 - 2,500
2,176 2,500 2,500 711 - 2,500
2,176 2,500 2,500 711 - 2,500
2,176 2,500 2,500 711 - 2,500
2550.35.0000.3405.100 Impact Fees Development Impact Fees 1,897 2,000 2,000 485 - 2,000 2550.35.0000.3610.100 Interest Revenue Investments - 200 200 - - 200 1,897 2,200 2,200 485 - 2,200
1,897 2,200 2,200 485 - 2,200
1,897 2,200 2,200 485 - 2,200
Program Total: 0000 - Non Program Activity
Department Total: 45 - Public Works
REVENUES Total
Fund REVENUE Total: 2521 - Signal Along SR 191 (Clark Rd) Fund EXPENSE Total: 2521 - Signal Along SR 191 (Clark Rd) Fund Total: 2521 - Signal Along SR 191 (Clark Rd)
Fund EXPENSE Total: 2520 - Impact Fees Signal Improvements Fund Total: 2520 - Impact Fees Signal Improvements
Fund: 2521 - Signal Along SR 191 (Clark Rd)

REVENUES
Department: 45 - Public Works
Program: 0000 - Non Program Activity
Department Total: 45 - Public Works
REVENUES Total
Fund REVENUE Total: 2520 - Impact Fees Signal Improvements Department: 35 - Fire
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 35 - Fire
REVENUES Total
REVENUES Total
Fund REVENUE Total: 2540 - Impact Fees Police Facilities Fund EXPENSE Total: 2540 - Impact Fees Police Facilities Fund Total: 2540 - Impact Fees Police Facilities
Fund: 2550 - Impact Fees Fire Facilities

REVENUES
Fund: 2540 - Impact Fees Police Facilities

REVENUES
Department: 30 - Police
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 30 - Police
1855
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
1,897 2,200 2,200 485 - 2,200
1,897 2,200 2,200 485 - 2,200
Fund REVENUE Total: 2550 - Impact Fees Fire Facilities
Fund EXPENSE Total: 2550 - Impact Fees Fire Facilities
Fund Total: 2550 - Impact Fees Fire Facilities
1856
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
2551.45.0000.3405.100 Impact Fees Development Impact Fees 15,374 15,500 15,500 2,499 - 15,500 2551.45.0000.3610.100 Interest Revenue Investments - 1,500 1,500 - - 1,500 15,374 17,000 17,000 2,499 - 17,000
15,374 17,000 17,000 2,499 - 17,000
15,374 17,000 17,000 2,499 - 17,000
2551.45.0000.5910.100 Transfer out to Capital Projects Fund - - - - 250,000 250,000 - - - - 250,000 250,000
- - - - 250,000 250,000
- - - - 250,000 250,000
15,374 17,000 17,000 2,499 - 17,000
- - - - 250,000 250,000
15,374 17,000 17,000 2,499 (250,000) (233,000)
2700.55.4800.3345.200 State Revenues - Other Miscellaneous 15,050 - - - - - 15,050 - - - - -
15,050 - - - - -
15,050 - - - - -
2700.55.4800.5213.100 Professional/Contract Services General 15,050 - - 6,959 - - 15,050 - - 6,959 - -
15,050 - - 6,959 - -
15,050 - - 6,959 - -
15,050 - - - - -
15,050 - - 6,959 - -
Fund: 2700 - SB-2 Building Homes and Jobs Act

REVENUES
Department: 55 - Business & Housing Services
Program: 4800 - Development Services
Program Total: 4800 - Development Services
Department Total: 55 - Business & Housing Services
Program Total: 0000 - Non Program Activity
Department Total: 45 - Public Works
REVENUES Total
Fund REVENUE Total: 2551 - Impact Fees - Drainage
Fund EXPENSE Total: 2551 - Impact Fees - Drainage
Fund Total: 2551 - Impact Fees - Drainage
Fund: 2551 - Impact Fees - Drainage

REVENUES
Department: 45 - Public Works
Program: 0000 - Non Program Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 45 - Public Works
EXPENSES Total
Department: 45 - Public Works

EXPENSES
EXPENSES Total
Fund REVENUE Total: 2700 - SB-2 Building Homes and Jobs Act Fund EXPENSE Total: 2700 - SB-2 Building Homes and Jobs Act REVENUES Total

EXPENSES
Department: 55 - Business & Housing Services
Program: 4800 - Development Services
Program Total: 4800 - Development Services
Department Total: 55 - Business & Housing Services
1857
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
- - - (6,959) - -
5900.40.4820.3345.001 State Revenues - Other LTF - Local Transit Funds 13,286 - - - - - 5900.40.4820.3902.201 Miscellaneous Revenue Paratransit Tickets 25 - - - - - 5900.40.4820.3902.202 Miscellaneous Revenues BC Transit Tickets 1,366 1,200 1,200 383 - 1,200 14,677 1,200 1,200 383 - 1,200
14,677 1,200 1,200 383 - 1,200
14,677 1,200 1,200 383 - 1,200
5900.40.4820.5260 Miscellaneous 1,391 1,200 1,200 286 - 1,200 5900.40.4820.5910.110 Transfers Out To Local Transportation Fund - 28,720 28,720 - - 28,720 1,391 29,920 29,920 286 - 29,920
1,391 29,920 29,920 286 - 29,920
1,391 29,920 29,920 286 - 29,920
14,677 1,200 1,200 383 - 1,200
1,391 29,920 29,920 286 - 29,920
13,286 (28,720) (28,720) 98 - (28,720)
7611.00.0000.3610.100 Interest Revenue Investments 12,336 20,000 20,000 - - 20,000 12,336 20,000 20,000 - - 20,000
12,336 20,000 20,000 - - 20,000
12,336 20,000 20,000 - - 20,000
7611.00.0000.5610 Trustee/Administrative Fees 572 450 450 - - 450 7611.00.0000.5620.101 Loss on Investment or Sale of Assets GASB 45 Trust 39,135 - - - - - 39,707 450 450 - - 450
39,707 450 450 - - 450
Fund Total: 2700 - SB-2 Building Homes and Jobs Act
Department: 40 - Community Development
Program: 4820 - CDD - Transit Operations
Program Total: 4820 - CDD - Transit Operations
Department Total: 40 - Community Development
REVENUES Total

EXPENSES
Fund: 5900 - Transit Fund

REVENUES
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Fund EXPENSE Total: 5900 - Transit Fund
Fund Total: 5900 - Transit Fund
Fund: 7611 - GASB 45 Retiree Medical Trust

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Department: 40 - Community Development
Program: 4820 - CDD - Transit Operations
Program Total: 4820 - CDD - Transit Operations
Department Total: 40 - Community Development
EXPENSES Total
Fund REVENUE Total: 5900 - Transit Fund
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
1858
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
39,707 450 450 - - 450
12,336 20,000 20,000 - - 20,000
39,707 450 450 - - 450
(27,371) 19,550 19,550 - - 19,550
EXPENSES Total
Fund REVENUE Total: 7611 - GASB 45 Retiree Medical Trust Fund EXPENSE Total: 7611 - GASB 45 Retiree Medical Trust Fund Total: 7611 - GASB 45 Retiree Medical Trust
1859
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
7624.40.4730.3401.335 CDD Building S.M.I.P. Fees 1,075 1,900 1,900 753 - 1,900 1,075 1,900 1,900 753 - 1,900
1,075 1,900 1,900 753 - 1,900
1,075 1,900 1,900 753 - 1,900
1,075 1,900 1,900 753 - 1,900
1,075 1,900 1,900 753 - 1,900
7627.00.0000.3406.101 Surcharge Tech Equip Replacement/Update 471,679 465,000 465,000 113,345 - 465,000 471,679 465,000 465,000 113,345 - 465,000
471,679 465,000 465,000 113,345 - 465,000
471,679 465,000 465,000 113,345 - 465,000
7627.00.0000.5199.199 Other Fund Support IT-Serv from Tech Fee 380,902 463,123 463,123 167,837 - 463,123 7627.00.0000.5910.203 Transfers Out Building Safety & WW Services - 116,000 116,000 - - 116,000 380,902 579,123 579,123 167,837 - 579,123
380,902 579,123 579,123 167,837 - 579,123
380,902 579,123 579,123 167,837 - 579,123
471,679 465,000 465,000 113,345 - 465,000
380,902 579,123 579,123 167,837 - 579,123
90,777 (114,123) (114,123) (54,492) - (114,123)
7628.00.0000.3345.200 State Revenues - Other Miscellaneous 124,679 65,000 65,000 - - 65,000 7628.00.0000.3406.100 Surcharge General Plan Fees 383,833 385,000 385,000 92,405 - 385,000 508,512 450,000 450,000 92,405 - 450,000
Program Total: 4730 - Building and Onsite Inspections
Department Total: 40 - Community Development
REVENUES Total
Fund REVENUE Total: 7624 - SMIP Strong Motion Impl Prog Fund EXPENSE Total: 7624 - SMIP Strong Motion Impl Prog Fund Total: 7624 - SMIP Strong Motion Impl Prog
Fund: 7624 - SMIP Strong Motion Impl Prog

REVENUES
Department: 40 - Community Development
Program: 4730 - Building and Onsite Inspections
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 7627 - Tech Equip Replacement/Update Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Fund: 7627 - Tech Equip Replacement/Update

REVENUES
Program Total: 0000 - Non Program Activity
Fund EXPENSE Total: 7627 - Tech Equip Replacement/Update Fund Total: 7627 - Tech Equip Replacement/Update
Fund: 7628 - General Plan Update

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
1860
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
508,512 450,000 450,000 92,405 - 450,000
508,512 450,000 450,000 92,405 - 450,000
7628.00.0000.5910.010 Transfers Out To General Fund 201,178 800,000 800,000 - - 800,000 201,178 800,000 800,000 - - 800,000
201,178 800,000 800,000 - - 800,000
201,178 800,000 800,000 - - 800,000
508,512 450,000 450,000 92,405 - 450,000
201,178 800,000 800,000 - - 800,000
307,333 (350,000) (350,000) 92,405 - (350,000)
7650.60.4975.3610.100 Interest Revenue Investments 117 - - 87 - - 7650.60.4975.3910.010 Transfers In From General Fund - 40,500 40,500 - - 40,500 7650.60.4975.3910.924 Transfers In From RDA Obligation Retirement 28,674 - - - - - 28,791 40,500 40,500 87 - 40,500
28,791 40,500 40,500 87 - 40,500
28,791 40,500 40,500 87 - 40,500
7650.60.4975.5213.100 Professional/Contract Services General 16,800 18,300 18,300 2,713 - 18,300 7650.60.4975.5500 Bond Payments - Fiscal Agent 8,500 6,000 6,000 - - 6,000 7650.60.4975.5502 Debt Service Payment - Interest 297,759 146,149 146,149 - - 146,149 7650.60.4975.5910.010 Transfers Out To General Fund 16,200 16,200 16,200 - - 16,200 339,259 186,649 186,649 2,713 - 186,649
339,259 186,649 186,649 2,713 - 186,649
339,259 186,649 186,649 2,713 - 186,649
28,791 40,500 40,500 87 - 40,500
339,259 186,649 186,649 2,713 - 186,649
(310,468) (146,149) (146,149) (2,625) - (146,149)
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 7628 - General Plan Update
Fund EXPENSE Total: 7628 - General Plan Update
Fund Total: 7628 - General Plan Update
Department Total: 00 - Non Department Activity
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Fund: 7650 - TOP as Successor RDA

REVENUES
Department: 60 - RDA
Program: 4975 - Successor RDANH Operations
Program Total: 4975 - Successor RDANH Operations
Department Total: 60 - RDA
EXPENSES Total
Fund REVENUE Total: 7650 - TOP as Successor RDA
Fund EXPENSE Total: 7650 - TOP as Successor RDA
Fund Total: 7650 - TOP as Successor RDA
Program Total: 4975 - Successor RDANH Operations
Department Total: 60 - RDA
REVENUES Total

EXPENSES
Department: 60 - RDA
Program: 4975 - Successor RDANH Operations
1861
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
7700.00.0000.3610.100 Interest Revenue Investments 1,185,490 1,100,000 1,100,000 381,490 - 1,100,000 7700.00.0000.3615.100 Gain / Loss on Investments - Realized General (225,803) - - (112,013) - - 7700.00.0000.3616.100 Change in Investment Value - Unrealized Gain/Loss General (10,994,594) - - 1,286,703 - -
7700.00.0000.3901.100 Refunds and Reimbursements Miscellaneous - - - 2,227,843 2,227,843 2,227,843 (10,034,907) 1,100,000 1,100,000 3,784,023 2,227,843 3,327,843 (10,034,907) 1,100,000 1,100,000 3,784,023 2,227,843 3,327,843 (10,034,907) 1,100,000 1,100,000 3,784,023 2,227,843 3,327,843 7700.00.0000.5213.100 Professional/Contract Services General 83,286 84,000 84,000 7,062 - 84,000 7700.00.0000.5910.010 Transfers Out To General Fund 5,996,186 10,985,377 11,131,247 4,687,925 44,050 11,175,297 6,079,472 11,069,377 11,215,247 4,694,987 44,050 11,259,297 6,079,472 11,069,377 11,215,247 4,694,987 44,050 11,259,297 6,079,472 11,069,377 11,215,247 4,694,987 44,050 11,259,297 (10,034,907) 1,100,000 1,100,000 3,784,023 2,227,843 3,327,843 6,079,472 11,069,377 11,215,247 4,694,987 44,050 11,259,297 (16,114,379) (9,969,377) (10,115,247) (910,964) 2,183,793 (7,931,454) 7808.30.0000.3610.100 Interest Revenue Investments - 175 175 - - 175 7808.30.0000.3650.100 Donations Private Sources 9,516 5,000 5,000 1,504 - 5,000 9,516 5,175 5,175 1,504 - 5,175
9,516 5,175 5,175 1,504 - 5,175
9,516 5,175 5,175 1,504 - 5,175
7808.30.4520.5202.100 Operating Supplies General 5,355 2,000 2,000 - - 2,000 5,355 2,000 2,000 - - 2,000
5,355 2,000 2,000 - - 2,000
Fund: 7700 - PG&E Settlement Fund

REVENUES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
EXPENSES Total
Fund REVENUE Total: 7700 - PG&E Settlement Fund
Fund EXPENSE Total: 7700 - PG&E Settlement Fund
Fund Total: 7700 - PG&E Settlement Fund
REVENUES Total

EXPENSES
Department: 00 - Non Department Activity
Program: 0000 - Non Program Activity
Program Total: 0000 - Non Program Activity
Department Total: 00 - Non Department Activity
Program Total: 0000 - Non Program Activity
Department Total: 30 - Police
REVENUES Total

EXPENSES
Department: 30 - Police
Program: 4520 - Police Operations
Fund: 7808 - Canine Protection Unit Donations

REVENUES
Department: 30 - Police
Program: 0000 - Non Program Activity
Program Total: 4520 - Police Operations
Department Total: 30 - Police
1862
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
5,355 2,000 2,000 - - 2,000
9,516 5,175 5,175 1,504 - 5,175
5,355 2,000 2,000 - - 2,000
4,161 3,175 3,175 1,504 - 3,175
EXPENSES Total
Fund REVENUE Total: 7808 - Canine Protection Unit Donations Fund EXPENSE Total: 7808 - Canine Protection Unit Donations Fund Total: 7808 - Canine Protection Unit Donations
1863
TOWN OF PARADISE Budget Worksheet Report as of October 20, 2022 G/L Account Number Account Description
FY 2021-22
Unaudited Actual
Amount
FY 2022-23
Adopted Budget
FY 2022-23
Amended Budget
FY 2022-23
Actual to Date
FY 2022-23
Proposed Amendments
FY 2022-23
Proposed
Amended Budget
7811.30.4540.3610.100 Interest Revenue Investments - 100 100 - - 100 7811.30.4540.3650.100 Donations Private Sources 16,669 3,400 3,400 3,285 - 3,400 7811.30.4540.3695.100 Private Grants Animal Control - - - 5,000 - - 16,669 3,500 3,500 8,285 - 3,500
16,669 3,500 3,500 8,285 - 3,500
16,669 3,500 3,500 8,285 - 3,500
7811.30.4540.5910.070 Transfers Out To Animal Control Fund 3,500 6,917 6,917 - - 6,917 3,500 6,917 6,917 - - 6,917
3,500 6,917 6,917 - - 6,917
3,500 6,917 6,917 - - 6,917
16,669 3,500 3,500 8,285 - 3,500
3,500 6,917 6,917 - - 6,917
13,169 (3,417) (3,417) 8,285 - (3,417)
Fund: 7811 - Animal Control Misc Donations

REVENUES
Fund EXPENSE Total: 7811 - Animal Control Misc Donations Fund Total: 7811 - Animal Control Misc Donations
Department: 30 - Police
Program: 4540 - Police - Animal Control
Program Total: 4540 - Police - Animal Control
Department Total: 30 - Police
EXPENSES Total
Fund REVENUE Total: 7811 - Animal Control Misc Donations Department: 30 - Police
Program: 4540 - Police - Animal Control
Program Total: 4540 - Police - Animal Control
Department Total: 30 - Police
REVENUES Total

EXPENSES
1864

Town of Paradise
Council Agenda Summary
Date: November 7, 2022
Agenda Item: 6(d)
ORIGINATED BY: Jessica Erdahl, Sr. Capital Projects Manager REVIEWED BY: Kevin Phillips, Town Manager
SUBJECT: Emergency Relief Project: 2023 On-System Road
Rehabilitation – PSE Approval and Authorize
Advertisement for Bids.

LONG TERM
RECOVERY PLAN:

Yes, Tier 1
COUNCIL ACTION REQUESTED:

1. Consider adopting Resolution No.2022- , A Resolution of the Town Council of the Town of Paradise approving the plans and specifications for the 2023 On-System Road Rehabilitation Project and authorizing advertisement for bids on the project. (ROLL CALL VOTE)
Background:

Due to the ongoing recovery effort and debris removal operations within the Town and Butte County, the Town’s on-system roadway infrastructure sustained heavy damage in the wake of the Camp Fire. The pavement structural sections were damaged in two ways:

1. Pavement Scarring due to Car Fires – On the day of the Camp Fire, several motorists were required to abandon their vehicles and continue evacuating on foot. The subsequent car fires damaged the pavement, justifying the need for repair.

2. Pavement Structural Section Damage due to Heavy Truck Traffic – Following the Camp Fire, the Town has experienced a staggering level of truck traffic. During the CALOES Debris Removal effort, over 3.7 million tons of material was removed, equivalent to approximately 300,000 truckloads. During that same period, PG&E, Comcast, and AT&T have restored the distribution infrastructure. PG&E has already removed over 92,000 trees, and an additional 100,000 trees are estimated for removal in 2020. The volume of trucks using the Town’s on-system roads has resulted in damage to the pavement structural section, justifying the need for rehabilitation.

The Town coordinated with Caltrans and Federal Highways Administration (FHWA) to secure Emergency Relief permanent restoration funding to repair damaged on-system roads town wide.

Through the Emergency Relief Program, the Town of Paradise has been approved for $55,439,200 for the on-system road rehabilitation project. The approved project is located on Federal-Aid “On-System” roads – meaning the Town’s primary collectors and arterials such as Skyway, Clark, Pearson, Elliott, Bille, Wagstaff, Pentz, etc.

On November 10, 2020, Paradise Town Council awarded master on-call contracts to Mark Thomas, Dokken Engineering, GHD, Inc., Wood Rodgers, Inc. and Dewberry Drake Haglan to perform on-call professional civil engineering services for a variety of local, state, and federallyfunded projects. Subsequently, in January 2021, task orders were issued to Mark Thomas, 1865
Dokken Engineering, and Wood Rodgers, Inc. to perform civil design services on the on-system road rehabilitation project.

The overall scope of work for the Project can be summarized as follows:
 Repair Camp Fire damaged on-system roads to achieve a pre-fire condition.

On June 14, 2022 Paradise Town Council awarded Contract No. 7303.1.CON, 2022 On-System Roadway Rehabilitation –Skyway (Project 1) to Baldwin Contracting Company, Inc. dba Knife River Construction in the amount of their base bid plus additive bid #1,$5,069,864.78.

A vicinity map of the town wide on-system road project limits, as well as the proposed 2023 project limits are provided in this Agenda Summary.

Analysis:

The on-system road rehabilitation project is consistent with priorities identified in the Paradise Long-Term Recovery Plan prepared in response to the 2018 Camp Fire and necessary to restore roadway infrastructure to a pre-fire condition.

Road rehabilitation projects will be identified based on utility undergrounding completion. As segments of utilities are nearing completion, the Town of Paradise will identify and bid specific segments of roadways as individual projects. The goal of this approach is to maximize efficiency, partnership and remain good stewards of precious public funds and community impacts by reducing excavations into recently rehabilitated roadways.

With Council approval of the plans and specifications and authorization to advertise for bids, staff proposes the following schedule:

Project No. 2 (2023) – Dean Road, Merrill Road, Wagstaff Road, Bille Road, Elliott Rd, Sawmill Road, Pearson Road, S Libby Road, Stearns Road, and Country Club Drive (8.5 miles).

Advertise for bid: November 2022
Award Contract: January 2023
Construction: Spring 2023
Future Projects – 2024-2025
Financial Impact:

FHWA Emergency Relief funds have been authorized as Advance Construction (AC) for the construction and construction engineering phases. Advance Construction is a project authorization technique that allows FHWA to authorize a project phase without obligating Federal funds. Projects authorized under Advance Construction procedures will not receive federal reimbursement until Federal funds become available and are obligated on a subsequent sequence. The Town will use local funds to perform the construction and construction engineering phases for future federal reimbursement. Emergency Relief AC funding is typically obligated as federal funds within 6 months following federal authorization to proceed.

The total estimated construction and construction engineering cost for on-system roads town wide is $51,935,200 and $8,8550,50.80 for the 2023 project. The estimated funding breakdown is shown below. A detailed project accounting description for each project bid will be made available at the time of contract award.
1866
2023 On-System Road Rehabilitation Project
Contract Items
Total
Estimated Cost
Total
Participating
Cost
Emergency Relief
(AC)

75.25 %
Local Match

24.75%
NonParticipating
(Utility
Adjustments)
Construction Project 2 -
2023 $ 7,379,209.00 $ 6,962,209.00 $ 5,239,062.27 $ 1,723,146.73 $ 417,000.00 Contingency (10%) $ 737,920.90 $ 737,920.90 $ 555,285.48 $ 182,635.42 Construction Management
(10%) $ 737,920.90 $ 737,920.90 $ 555,285.48 $ 182,635.42 $ - Total $ 8,855,050.80 $ 8,438,050.80 $ 6,349,633.23 $ 2,088,417.57 $ 417,000.00 Total Available Funding $ 46,907,348.74 $ 46,066,861.66 $ 34,665,313.40 $ 11,401,548.26 $ 840,487.08 Balance $ 38,052,297.94 $ 37,628,810.86 $ 28,315,680.17 $ 9,313,130.69 $ 423,487.08 Required matching funds, $2,088,417.57 (24.75%), are anticipated to be awarded through the Community Development Block Grant-Disaster Recovery fund allocation process.

Environmental Review:

The project is exempt under State CEQA Guidelines [Section 15269(a)], which states:

The following emergency projects are exempt from the requirements of CEQA. (a) Projects to maintain, repair, restore, demolish, or replace property or facilities damaged or destroyed as a result of a disaster in a disaster-stricken area in which a state of emergency has been proclaimed by the Governor pursuant to the California Emergency Services Act, commencing with Section 8550 of the Government Code. This includes projects that will remove, destroy, or significantly alter an historical resource when that resource represents an imminent threat to the public of bodily harm or of damage to adjacent property or when the project has received a determination by the State Office of Historic Preservation pursuant to Section 5028(b) of Public Resources Code.

The project location is a disaster-stricken area, proclaimed as a major disaster by the President on November 12, 2018 (FEMA-4407-DR) and as a State of Emergency by the State of California on November 8, 2018. The purpose of the project is to repair existing infrastructure damaged by the Camp Fire. No further environmental review is necessary for this project.

Attachments:

A. On-System Road Vicinity Map
B. Project Map 2023
C. Resolution
1867
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community ±
0 0.5 1
Miles

TOWN OF PARADISE

PUBLIC WORKS DEPARTMENT
5555 Skyway Road
Paradise, California 95969 J ERDAHL
OCT 2022

PROJECT

LOCATION
MAP
Legend
Paradise Town Limits
On-System Roads

OONN--SSYYSSTTEEMM RROOAADD

RREEHHAABBIILLIITTAATTIIOONN PPRROOJJEECCTT
FFEEDDEERRAALL--AAIIDD NNOO.. EERR3388YY00((001122))
1868
Saw
mill Rd Pearson Road
Elliott Rd
S L bi by
Bille Rd
Wagstaff
Merrill Road
C
ountry
Club
Dean Road
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
PPRROOJJEECCTT NNOOTTIIFFIICCAATTIIOONN MMEEMMOO NNOO.. 22 22002233 OONN--SSYYSSTTEEMM RROOAADD

RREEHHAABBIILLIITTAATTIIOONN PPRROOJJEECCTT
FFEEDDEERRAALL--AAIIDD NNOO.. EERR3388YY00((001122))

TOWN OF PARADISE

PUBLIC WORKS DEPARTMENT
5555 Skyway Road
Paradise, California 95969
±
0 0.25 0.5
Miles

J ERDAHL
OCT 2022

PROJECT

LOCATION
MAP
Legend
Paradise Town Limits
2023 On-System Roads
2023 On-System Roads
1869

TOWN OF PARADISE
RESOLUTION NO. 2022-____

A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF PARADISE APPROVING THE PLANS, SPECIFICATIONS AND ESTIMATES FOR THE 2023

ON-SYSTEM ROAD REHABILITATION PROJECT AND AUTHORIZING
ADVERTISEMENT FOR BIDS ON THE PROJECT.

WHEREAS, on-system roads sustained damage as a result of the Camp Fire; and,
WHEREAS, the Town of Paradise has received a $55,439,200 allocation of Federal Highway Administration Emergency Relief Program funds; and, WHEREAS, the purpose of the Emergency Relief Program is Repair or reconstruction of Federal-aid highways and roads (“On-System”) which have suffered serious damage as a result of natural disasters.

WHEREAS, eligible repairs may include, but are not limited to, damage occurring to pavement or other surface courses, shoulders, embankments, cut slopes, roadside development, and stream channels, whether man-made or natural. Pavement repairs or reconstruction may also include rock slope protection, cribbing, or other stream bank control features, bridges, retaining walls, culverts and debris removal, including other deposits from roadway drainage channels and the traveled way.

WHEREAS, the 2023 On-System Road Rehabilitation Project is consistent in scope with the approved emergency relief funds: and,
WHEREAS, the 2023 On-System Road Rehabilitation Project is consistent with priorities identified in the Paradise Long-Term Recovery Plan prepared in response to the 2018 Camp Fire.

NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF PARADISE AS FOLLOWS:

Section 1. The design, plans, specifications and estimates for the 2023 OnSystem Road Rehabilitation Project described in the Town Council Agenda Summary for this Resolution are hereby approved.

Section 2. The Public Works Department is authorized to advertise the 2023 On-System Road Rehabilitation Project.

Section 3. The 2023 On-System Road Rehabilitation Project is exempt from the provisions of the California Environmental Quality Act pursuant to State CEQA Guidelines [Section 15269(a)] Emergency Projects.

PASSED AND ADOPTED by the Town Council of the Town of Paradise on this 7th day of November 2022, by the following vote:
//
1870

TOWN OF PARADISE
RESOLUTION NO. 2022-
2 AYES:

NOES:

ABSENT:

ABSTAIN:

By:

Steve Crowder, Mayor
ATTEST:

Dina Volenski, CMC, Town Clerk
APPROVED AS TO FORM:

Scott E. Huber, Town Attorney
1871
Town of Paradise
Council Agenda Summary
Date: November 7, 2022
Agenda Item: 6(e)
ORIGINATED BY: Marc Mattox, Public Works Director/Town Engineer REVIEWED BY: Kevin Phillips, Town Manager
SUBJECT: Off-System Road Rehabilitation Project– PSE Approval and Authorize Advertisement for Bids.

LONG TERM
RECOVERY PLAN:

Yes, Tier 1
COUNCIL ACTION REQUESTED:

1. Consider directing staff to submit a formal request to FEMA designating FEMA-4407- DR-CA PA ID: 007-55520-00 PW 363 as an Improved Project. (ROLL CALLVOTE) Background:

Due to the ongoing recovery effort and debris removal operations within the Town and Butte County, the Town’s off-system roadway infrastructure sustained heavy damage in the wake of the Camp Fire. The pavement structural sections were damaged in two ways:

1. Pavement Scarring due to Car Fires – On the day of the Camp Fire, several motorists were required to abandon their vehicles and continue evacuating on foot. The subsequent car fires damaged the pavement, justifying the need for repair.

2. Pavement Structural Section Damage due to Heavy Truck Traffic – Following the Camp Fire, the Town has experienced a staggering level of truck traffic. During the CALOES Debris Removal effort, over 3.7 million tons of material was removed, equivalent to approximately 300,000 truckloads. During that same period, PG&E, Comcast, and AT&T have restored the distribution infrastructure. PG&E has already removed over 92,000 trees, and an additional 100,000 trees are estimated for removal in 2020. The volume of trucks using the Town’s on-system roads has resulted in damage to the pavement structural section, justifying the need for rehabilitation.

The Town coordinated with the Federal Emergency Management Agency (FEMA) to secure Public Assistance permanent restoration funding to repair damaged off-system roads town wide.

Through the Public Assistance Program, the Town of Paradise has been approved for $38,290,000 for the off-system road rehabilitation project. The approved project is located on “OffSystem” roads. Off-system roadway rehabilitation include roadways that are not on the on-system roadways and will be funded by FEMA.

On November 10, 2020, Paradise Town Council awarded master on-call contracts to Mark Thomas, Dokken Engineering, GHD, Inc., Wood Rodgers, Inc. and Dewberry Drake Haglan to perform on-call professional civil engineering services for a variety of local, state, and federallyfunded projects. Subsequently, in January 2021, task orders were issued to GHD, Dokken Engineering, and Dewberry to perform civil design services on the off-system road rehabilitation project.
1872
Analysis:

During the design process, engineering design and code requirements required several modifications of the approved scope of work listed in the FEMA Public Assistance Project Worksheet. This cost-neutral scope change was submitted to CalOES and FEMA in March of 2022. The primary transmittal is attached to this Agenda Summary which explains the scope changes required, including approval of new road rehabilitation techniques, upgrades to pedestrian access ramps and monument preservation.

In recent weeks in coordination with CalOES and FEMA, a recommendation has been made for the Town to make a request for a conversion to an Improved Project in accordance with 44 CFR 206.203(d)(1), copied below:

Improved projects. If a subrecipient desires to make improvements, but still restore the predisaster function of a damaged facility, the recipient's approval must be obtained. Federal funding for such improved projects shall be limited to the Federal share of the approved estimate of eligible costs.

This designation would allow the Town and FEMA to avoid arduous reviews and clarifications on the requested scope change and move forward towards completion. The major caveat with an Improved Project is that in the event project work exceeds the original allocation amount, no additional funds may be awarded – meaning potential cost increases would be borne by the Town of Paradise. Unchanged, however, only incurred actual costs up to the approved amount could be reimbursed.

Staff has reviewed the impacts of this potential action and is requesting Council approval to formally request the Improved Project designation for this work effort. In forecasting future project implementation based on current construction costs and potential global economic changes, staff believes the risk associated with the action is outweighed by the benefits of streamlining the project process and scope revisions needed.

If approved, staff will submit the Improved Project request immediately aiming for a quick approval to ensure no delays are incurred in delivering the 2023 Off-System Paving Project.

Financial Impact:

The total estimated construction and construction engineering cost for off-system roads town wide is $38,290,000. The estimated funding breakdown is shown below.

Off-System Road Rehabilitation Project
Phase
Total
Estimated Cost
Total
Participating
Cost
FEMA/CalOES

93.75 %
Local/CDBG-DR
Match 6.25%
Preliminary Engineering $3,064,000.00 $ 3,064,000.00 $ 2,872,500.00 $ 191,500.00 Construction $30,631,000.00 $ 30,631,000.00 $ 28,716,562.50 $ 1,914,437.50 Construction Management $4,595,000.00 $ 4,595,000.00 $ 4,307,812.50 $ 287,187.50 Total $ 38,290,000.00 $ 38,290,000.00 $ 35,896,875.00 $ 2,393,125.00 1873
Required matching funds, $2,393,125 (6.25%), are planned for approved Paradise Community Development Block Grant-Disaster Recovery Infrastructure fund allocations.

Finally, staff recommends the addition of a contingency fund using Paradise Community Development Block Grant-Disaster Recovery Infrastructure fund allocations. Based on recent grant award announcements, staff is planning a CDBG-DR Action Plan Amendment in December 2022 which will allow for additional projects to be funded – including increasing the fund’s commitment from just the minimum match requirement to include a $5M contingency reserve.

This reserve will offset the risk of an Improved Project designation in the event construction costs exceed original approved funding amounts.

Environmental Review:

The project is exempt under State CEQA Guidelines [Section 15269(a)], which states:

The following emergency projects are exempt from the requirements of CEQA. (a) Projects to maintain, repair, restore, demolish, or replace property or facilities damaged or destroyed as a result of a disaster in a disaster-stricken area in which a state of emergency has been proclaimed by the Governor pursuant to the California Emergency Services Act, commencing with Section 8550 of the Government Code. This includes projects that will remove, destroy, or significantly alter an historical resource when that resource represents an imminent threat to the public of bodily harm or of damage to adjacent property or when the project has received a determination by the State Office of Historic Preservation pursuant to Section 5028(b) of Public Resources Code.

The project location is a disaster-stricken area, proclaimed as a major disaster by the President on November 12, 2018 (FEMA-4407-DR) and as a State of Emergency by the State of California on November 8, 2018. The purpose of the project is to repair existing infrastructure damaged by the Camp Fire. No further environmental review is necessary for this project.

Attachments:
- FEMA Scope Change Request Memo
1874
Town of Paradise
Public Works Department
5555 Skyway
Paradise, CA 95969
(530) 872-6291
March 10, 2022
Mr. David Gillings
Public Assistance Officer
California Office of Emergency Services
3650 Schriever Avenue
Mather, CA 95655
Subject: Scope Change Request, FEMA-4407-DR-CA PA ID: 007-55520-00 Dear Mr. Gillings:

The Town of Paradise requests a scope of work change for the uncompleted permanent work under PW#363 as a result of the Camp Fire. PW#363 aims to repair surface and structural damage to “Off-System” (non-Federal Highways Administration/National Highway System) roadways in the Town of Paradise. This scope of work change does not increase the overall cost of the project. The following scope of work is currently included in the approved Project Report:
• Replace asphalt concrete pavement
• Replace of hot mix asphalt (.25' Depth)
• Replace of hot mix asphalt (Digouts w/.25' Depth )
• Replace of aggregate base
• Remove roadway
• Replace thermoplastic traffic stripe
• Replace Inductive loop detector
The proposed scope of work change includes the above list as well as the following items of work:
• Pavement Structural Section Repairs
o Full-Depth Reclamation – Cement
o Pulverized Roadbed
• ADA Curb Ramp Reconstruction
• Utility and Monument Adjustments
o Adjust Utilities/Monuments to Grade
o Re-establish Monument
Introduction
Since the Project Worksheet was approved, the Town has retained a team of highly qualified civil engineering team to prepare plans, specifications, and estimates for the off-system road rehabilitation project. Final plans, specifications and estimates were recently completed in January 2022. These plans were prepared with the benefit of proper design using supplemental topographic surveys and detailed geotechnical field investigations, which were not available when the original project was created. These critical items assisted the design process to ensure damage repair techniques are both efficient and effective. 1875
This letter aims to document the repair techniques to be utilized in the revised project, summarized below:

1. Pavement Structural Section Design – Additional geotechnical data has been gathered, including RValues and pavement cores for the various segments of roadways. Generally, R-Values were lower and pavement sections were thinner than what was assumed in original scope request. The road rehabilitation strategies changed as a result.

2. ADA Curb Ramp Reconstruction – Department of Justice requires all curb ramps to be upgraded to meet ADA standards in conjunction with pavement rehabilitation projects. This work was not included in the original scope.

3. Utility and Monument Adjustments – Paradise Irrigation District, a California Special Public Utility District has approximately 791 utility covers in the pavement structural section requiring adjustment during paving operations. The Town of Paradise also has town owned storm drain infrastructure requiring adjustment to accommodate paving operations. Additionally, monument protection and reestablishment, governed by Section 8771 and Section 8725 of the Business and Professions Code and Section 605 of the California Penal Code, need to be included as items of work.

Background
Due to the ongoing recovery effort and debris removal operations within the Town and Butte County, the Town’s roadway infrastructure sustained heavy damage in the wake of the Camp Fire. A vicinity map showing off-system road routes within the Town is included within Attachment 1.

As result of the Camp Fire, the pavement structural sections on Off-System roads were damaged in two major ways:

1. Pavement scarring due to vehicle fires – On the day of the Camp Fire, several motorists were required to abandon their vehicles and continue evacuating on foot. The subsequent vehicle fires damaged the pavement, justifying the need for repair.

2. Pavement structural section damage due to heavy truck traffic – Following the Camp Fire, the Town has experienced a staggering level of truck traffic. During the CALOES Debris Removal effort, over 3.7 million tons of material was removed, equivalent to approximately 300,000 truckloads. During that same period, PG&E, Comcast, and AT&T have restored the distribution infrastructure. PG&E has already removed over 92,000 trees, and an additional 100,000 trees were estimated for removal in 2020. The volume of trucks using the Town’s off-system roads has resulted in damage to the pavement structural section, justifying the need for rehabilitation.

Immediately following the Camp Fire, Town staff worked with FHWA and FEMA to develop a strategy for rehabilitation of all on-system and off-system roads within the Town limits. The direction was to demonstrate “visible evidence” of pavement damage related to the incident, specifically to capture damage due to debris hauling. In response, the Town has performed two road condition surveys. The first survey was performed in January 2019, and the second was performed in September 2019. The timing of the surveys was to document the pavement condition immediately following the fire and then provide evidence of damage after 8 months of intense hauling. The visual evidence suggests that all off-system roads need rehabilitation because of the Camp Fire and are eligible for Public Assistance and Emergency Relief Program funds through FEMA and FHWA, respectively.

The Town prepared a funding request to justify the pavement rehabilitation required for all off-system roads within the Town limits. The request included technical information requested by FEMA, including explicit criteria justifying full-depth pavement reconstruction (Digouts), traffic counts, and Traffic Index (TI) calculations. 1876
Based on the condition surveys, the most apparent evidence of pending pavement failure is due to increased cracking and rutting. An increase in the longitudinal and transverse cracking, with isolated areas of alligator cracking was observed when the two roadway surveys were compared. An increase in rutting, especially in the areas where trucks start and stop was also observed throughout the roadway network.

Based on the evidence provided by the road condition surveys and limited information regarding the existing soil conditions, the Town of Paradise proposed a rehabilitated pavement section including two primary components:
• Full Depth Pavement Reconstruction (Digouts) (3” Hot Mix Asphalt over 4” Aggregate Base) – Digouts will be constructed where changes in cracking and rutting are severe. • Cold Plane and Overlay (2” Cold Plane and 3” Hot Mix Asphalt Overlay) – The grind and overlay will be applied to the entire roadway surface (including digout locations).

When these treatment techniques were selected limited geotechnical data was available and the existing pavement structural sections were unknown. Given the timeframe required to submit the request within the PA program, detailed analysis was deferred to the preliminary engineering and design phase.

Item 1 - Pavement Repair Techniques including FDR and Pulverization Following the completion of required studies and design, critical factors were discovered which require a modified approach to pavement repairs, explained further below.

Traffic Volumes
The original funding application used traffic counts from BCAG’s Post Camp Fire Population Study conducted in November 2019. This scope change request proposes using average daily traffic estimates from BCAG’s regional traffic model developed 2017/2018 (pre-Camp Fire). While traffic volumes are slightly higher in the pre-Camp Fire estimates, the truck ratios are much lower than what was observed in the Post Camp Fire Population Study.

Traffic Index Calculations
Originally calculated TIs using traffic data from the Post Camp Fire Population Study ranged from 8.5 to

10.7. For funding estimate purposes, a TI of 8 was used for all off-system roads in the original funding application. A TI of 8 was intended to provide a resilient pavement section that would serve the town beyond the immediate recovery period.

During preparation of the geotechnical reports, it was observed that using a TI of 8 was too conservative for many of the low-volume off-system roads. The calculated TI’s, using the revised traffic volumes (precamp Fire) ranged from 5 to 7, lower than originally estimated. The reduced TI’s included in the final geotechnical reports helped off-set a portion of the construction cost increases discussed later in this memorandum.

Resistance Values (R Values)
When the original funding application as prepared, an R-Value of 23 was assumed based on available geotechnical testing provided by Butte County. As part of the 100% plans, detailed subsurface geotechnical investigations were performed, and the true R-values were determined. The calculated Rvalues ranged from 8 to 47. However, in order to reduce the number of pavement structural sections required for the project, the R-Values used for final design ranged from 15 to 30. Setting the minimum R-value to 15 resulted in a cost saving measure as well. 1877
After the geotechnical field investigations and lab analysis was complete, the pavement rehabilitation strategies proposed in the original project worksheet need to be expanded. In areas where the estimated digout surface area exceeds 20% of the total surface area of a logical roadway segment, the design team considered the use of Full Depth Reclamation (FDR) or pulverization in lieu of the pavement digout / overlay strategy. Roads with HMA or chip seal surfaces that were less than 0.15 feet thick and are supported on either subgrade soils or relatively thin sections of AB are not suitable for FDR, therefore pulverization was the selected roadway rehabilitation treatment.

Within these roadway segments, the cost of constructing the digouts would be equivalent to or more expensive than placing FDR or pulverizing for the following reasons:
• Labor costs for saw cutting, excavating, placing material, and compaction are eliminated. • Construction process for FDR or pulverization reduces contract working days • Reduced working days results in lower traffic control costs and minimizes disturbance to the travelling public.

The Town understands the need to avoid betterments under the FEMA Public Assistance program. The use of FDR or pulverization will provide a superior product when compared to the digouts for a reduced cost. The proposal for FDR and pulverization was considered very carefully by Town staff and the civil engineering team, and it was determined these strategies represented the most efficient and effective use of critical funding.

Item 2 - ADA Curb Ramp Reconstruction
Title II of the Americans with Disabilities Act (ADA) requires that state and local governments ensure that persons with disabilities have access to the pedestrian routes in the public right of way. An important part of this requirement is the obligation whenever streets, roadways, or highways are altered to provide compliant curb ramps where street level pedestrian walkways cross curbs. This requirement is intended to ensure the accessibility and usability of the pedestrian walkway for persons with disabilities.

Based on guidance from the Department of Justice and Department of Transportation dated July 8, 2013 (See Attachment 5), curb ramps shall be included or upgraded to current standards in conjunction with pavement rehabilitation projects. It is the responsibility of the Town to meet these requirements and remain compliant with Title II of the Americans with Disabilities Act . This work was not included in the original funding 1878
documentation. The Town’s civil engineering team prepared ADA Assessment memorandums (See Attachment 4) to document existing conditions, non-compliant curb ramps, and identify construction costs. This scope change request to upgrade ramps to meet current standards does not increase the overall funding request, due to cost saving measure discussed previously in this memorandum.

Item 3 - Utility and Monument Adjustments
Paradise Irrigation District, a California Special Public Utility District has approximately 791 utility covers in the pavement structural section. The off-system road rehabilitation project work necessitates the adjustment of PIDs utility lids below grade (for milling operations) and back to new finished grade following the installation of the roadway treatment. PID is a special public utility district eligible to receive FEMA funding and was also impacted by the Camp Fire. Correspondence with Cal OES on February 16, 2022 indicated that PID utility adjustments are a FEMA reimbursable eligible expense. Further, the Town of paradise owns and maintains storm drain infrastructure. These covers will also require adjustment to accommodate paving operations and have been included in this scope change request.

Section 8771 and section 8725 of the Business and Professions Code and Section 605 of the California Penal Code governs perpetuating, preserving and re-establishing all survey monumentation. Any monuments to be disturbed as a result of construction activities, will require re-establishment under the direction of a Licensed Surveyor. Monuments located in existing well, will require adjustments to grade, similar to the above utilities.

This scope change request to adjust utilities and monuments does not increase the overall funding request, due to cost saving measure discussed previously in this memorandum.

Summary
Leadership from the Town of Paradise, Caltrans, FHWA, FEMA and CalOES have been working together closely to ensure the Camp Fire recovery is a success. Repairing the Town’s roadway network is critical to this objective.

These repairs must be completed as soon as possible and sequenced in the recovery to prevent further damage and costs to the recovery.

We hope this letter provides a clear justification for the scope of work change request. For the sake of consistency amongst other federal recovery partners, a comparable modification request was made to FWHA and subsequently approved on October 7, 2021. This approved request did expand the repair techniques available for the project.

If you would like to meet or require additional information, please let us know. Thank you for effort in helping rebuild Paradise.

This scope of work change request applies to the project listed below according to the FEMA Grants Portal project number:
#132422 - P/W0363 DR4407 - Town of Paradise – Road Damages Occurring During the performance of Emergency Work (PPDR and Hazardous Tree
Removal)
Sincerely,
Marc Mattox
Public Works Director/Town Engineer
1879
Attachments

1. Project Vicinity Map

2. 100% Plans and Cost Estimate

3. Geotechnical Design Reports

4. ADA Assessment Memorandum

5. Department of Justice Memorandum
1880
Town of Paradise
Council Agenda Summary
Date: November 7, 2022
Agenda Item: 6(f)
ORIGINATED BY: Jessica Erdahl, Sr. Capital Projects Manager REVIEWED BY: Kevin Phillips, Town Manager
SUBJECT: Off-System Road Rehabilitation Project– PSE Approval and Authorize Advertisement for Bids.

LONG TERM
RECOVERY PLAN:

Yes, Tier 1
COUNCIL ACTION REQUESTED:

1. Consider adopting Resolution No.2022- , A Resolution of the Town Council of the Town of Paradise approving the plans and specifications for the Off-System Road Rehabilitation Project and authorizing advertisement for bids on the project. (ROLL

CALL VOTE)
Background:

Due to the ongoing recovery effort and debris removal operations within the Town and Butte County, the Town’s off-system roadway infrastructure sustained heavy damage in the wake of the Camp Fire. The pavement structural sections were damaged in two ways:

1. Pavement Scarring due to Car Fires – On the day of the Camp Fire, several motorists were required to abandon their vehicles and continue evacuating on foot. The subsequent car fires damaged the pavement, justifying the need for repair.

2. Pavement Structural Section Damage due to Heavy Truck Traffic – Following the Camp Fire, the Town has experienced a staggering level of truck traffic. During the CALOES Debris Removal effort, over 3.7 million tons of material was removed, equivalent to approximately 300,000 truckloads. During that same period, PG&E, Comcast, and AT&T have restored the distribution infrastructure. PG&E has already removed over 92,000 trees, and an additional 100,000 trees are estimated for removal in 2020. The volume of trucks using the Town’s on-system roads has resulted in damage to the pavement structural section, justifying the need for rehabilitation.

The Town coordinated with the Federal Emergency Management Agency (FEMA) to secure Public Assistance permanent restoration funding to repair damaged off-system roads town wide.

Through the Public Assistance Program, the Town of Paradise has been approved for $38,290,000 for the off-system road rehabilitation project. The approved project is located on “OffSystem” roads. Off-system roadway rehabilitation include roadways that are not on the on-system roadways and will be funded by FEMA.

On November 10, 2020, Paradise Town Council awarded master on-call contracts to Mark Thomas, Dokken Engineering, GHD, Inc., Wood Rodgers, Inc. and Dewberry Drake Haglan to perform on-call professional civil engineering services for a variety of local, state, and federallyfunded projects. Subsequently, in January 2021, task orders were issued to GHD, Dokken Engineering, and Dewberry to perform civil design services on the off-system road rehabilitation project.
1881
The overall scope of work for the Project can be summarized as follows:
 Repair Camp Fire damaged off-system roads to achieve a pre-fire condition.

A vicinity map of the town wide off-system road project limits, as well as the proposed 2023 project limits are provided in this Agenda Summary.

Analysis:

The off-system road rehabilitation project is consistent with priorities identified in the Paradise Long-Term Recovery Plan prepared in response to the 2018 Camp Fire and necessary to restore roadway infrastructure to a pre-fire condition.

Road rehabilitation projects will be identified based on utility undergrounding completion. As segments of utilities are nearing completion, the Town of Paradise will identify and bid specific segments of roadways as individual projects. The goal of this approach is to maximize efficiency, partnership and remain good stewards of precious public funds and community impacts by reducing excavations into recently rehabilitated roadways.

With Council approval of the plans and specifications and authorization to advertise for bids, staff proposes the following schedule:

Project No. 1 (2023) – 12.5 miles
Advertise for bid: December 2022
Award Contract: February 2023
Construction: Spring 2023
Future Projects – 2023-2025
Financial Impact:

FEMA Public Assistance funds have been authorized for construction and construction engineering phases at actual documented cost incurred. However, a concurrent agenda item will be presented requesting authorization to request an Improved Project though FEMA.

The total estimated construction and construction engineering cost for off-system roads town wide is $35,226,000 and $8,305,947 for the 2023 project. The estimated funding breakdown is shown below. A detailed project accounting description for each project bid will be made available at the time of contract award.

Off-System Road Rehabilitation Project
Staff Report- Phase
Phase
Total
Estimated Cost
Total
Participating
Cost
FEMA/CalOES

93.75 %
Local Match

6.25%
Preliminary Engineering $3,064,000.00 $ 3,064,000.00 $ 2,872,500.00 $ 191,500.00 Construction $30,631,000.00 $ 30,631,000.00 $ 28,716,562.50 $ 1,914,437.50 Construction Management $4,595,000.00 $ 4,595,000.00 $ 4,307,812.50 $ 287,187.50 Total $ 38,290,000.00 $ 38,290,000.00 $ 35,896,875.00 $ 2,393,125.00 Required matching funds, $2,393,125 (6.25%), are anticipated to be awarded through the Community Development Block Grant-Disaster Recovery fund allocation process. 1882
Staff Report- 2023 Project
Construction and CM
Construction/CM
Total
Estimated Cost
Total
Participating
Cost
FEMA/CalOES

93.75 %
Local Match

6.25%
Construction Project 1 - 2023 $ 6,921,622.27 $ 6,921,622.27 $ 6,489,020.88 $ 432,601.39 Contingency (10%) $ 692,162.23 $ 692,162.23 $ 648,902.09 $ 43,260.14 Construction Management (10%) $ 692,162.23 $ 692,162.23 $ 648,902.09 $ 43,260.14 Total $ 8,305,946.72 $ 8,305,946.72 $ 7,786,825.05 $ 519,121.67 Total Available Funding $ 35,226,000.00 $35,226,000.00 $ 33,024,375.00 $ 2,201,625.00 Balance $ 26,920,053.28 $ 26,920,053.28 $ 25,237,549.95 $ 1,682,503.33 Environmental Review:

The project is exempt under State CEQA Guidelines [Section 15269(a)], which states:

The following emergency projects are exempt from the requirements of CEQA. (a) Projects to maintain, repair, restore, demolish, or replace property or facilities damaged or destroyed as a result of a disaster in a disaster-stricken area in which a state of emergency has been proclaimed by the Governor pursuant to the California Emergency Services Act, commencing with Section 8550 of the Government Code. This includes projects that will remove, destroy, or significantly alter an historical resource when that resource represents an imminent threat to the public of bodily harm or of damage to adjacent property or when the project has received a determination by the State Office of Historic Preservation pursuant to Section 5028(b) of Public Resources Code.

The project location is a disaster-stricken area, proclaimed as a major disaster by the President on November 12, 2018 (FEMA-4407-DR) and as a State of Emergency by the State of California on November 8, 2018. The purpose of the project is to repair existing infrastructure damaged by the Camp Fire. No further environmental review is necessary for this project.

Attachments:

A. Vicinity Map
B. Project Map 2023
C. Resolution
1883
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community ±
0 0.5 1
Miles

TOWN OF PARADISE

PUBLIC WORKS DEPARTMENT
5555 Skyway Road
Paradise, California 95969 J ERDAHL
OCT 2022

PROJECT

LOCATION
MAP
Legend
Paradise Town Limits
Off-System Roads

OFF-SYSTEM ROAD OFF-SYSTEM ROAD

REHABIILIITATIION PROJECT
1884
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
PPRROOJJEECCTT NNOOTTIIFFIICCAATTIIOONN MMEEMMOO NNOO.. 11 22002233 OOFFFF--SSYYSSTTEEMM RROOAADD

RREEHHAABBIILLIITTAATTIIOONN PPRROOJJEECCTT

TOWN OF PARADISE

PUBLIC WORKS DEPARTMENT
5555 Skyway Road
Paradise, California 95969
±
0 0.25 0.5
Miles

J ERDAHL
OCT 2022

PROJECT

LOCATION
MAP
Legend
Paradise Town Limits
2023 Off-System Roads
2023 Off-System Roads
1885

TOWN OF PARADISE
RESOLUTION NO. 2022-____

A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF PARADISE

APPROVING THE PLANS, SPECIFICATIONS AND ESTIMATES FOR THE

OFF-SYSTEM ROAD REHABILITATION PROJECT AND AUTHORIZING
ADVERTISEMENT FOR BIDS ON THE PROJECT.

WHEREAS, off-system roads sustained damage as a result of the Camp Fire; and,
WHEREAS, the Town of Paradise has received a $38,290,000 allocation of Federal Emergency Management Agency Public Assistance funds; and, WHEREAS, the purpose of the Public Assistance Program is to Repair or reconstruct Non-Federal aid highways and roads (“Off-System”) which have suffered serious damage as a result of natural disasters.

WHEREAS, eligible repairs may include, but are not limited to, damage occurring to pavement or other surface courses, shoulders, embankments, cut slopes, roadside development, and stream channels, whether man-made or natural. Pavement repairs or reconstruction may also include rock slope protection, cribbing, or other stream bank control features, bridges, retaining walls, culverts and debris removal, including other deposits from roadway drainage channels and the traveled way.

WHEREAS, the Off-System Road Rehabilitation Project is consistent in scope with the approved Public Assistance funds: and,
WHEREAS, the Off-System Road Rehabilitation Project is consistent with priorities identified in the Paradise Long-Term Recovery Plan prepared in response to the 2018 Camp Fire.

NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF PARADISE AS FOLLOWS:

Section 1. The design, plans, specifications and estimates for the Off-System Road Rehabilitation Project described in the Town Council Agenda Summary for this Resolution are hereby approved.

Section 2. The Public Works Department is authorized to advertise the OffSystem Road Rehabilitation Project.

Section 3. The Off-System Road Rehabilitation Project is exempt from the provisions of the California Environmental Quality Act pursuant to State CEQA Guidelines [Section 15269(a)] Emergency Projects.

PASSED AND ADOPTED by the Town Council of the Town of Paradise on this 7th day of November 2022, by the following vote:
//
//
1886

TOWN OF PARADISE
RESOLUTION NO. 2022-
2 AYES:

NOES:

ABSENT:

ABSTAIN:

By:

Steve Crowder, Mayor
ATTEST:

Dina Volenski, CMC, Town Clerk
APPROVED AS TO FORM:

Scott E. Huber, Town Attorney
1887
1 Town of Paradise
Council Agenda Summary
Date: November 7, 2022
Agenda Item: 6(g)
ORIGINATED BY: Marc Mattox, Public Works Director/Town Engineer Ashley Stanley, Engineering Division Manager
REVIEWED BY: Kevin Phillips, Town Manager
SUBJECT: 2022 Transportation Master Plan-Honey Run Road

LONG TERM
RECOVERY PLAN:

Yes, Tier 1 – Multiple
COUNCIL ACTION REQUESTED:

Upon conclusion of public discussion of the findings of the Transportation Master Plan supplemental Honey Run Road analysis, relating to the Honey Run Road reopening, consider a resolution, or an alternative action:

1. Consider adopting Town of Paradise Resolution No. 2022-____, “A Resolution of the Town Council of the Town of Paradise expressing a desire to reopen Honey Run Road between Town Limits and Honey View Terrace as a Historical Community Route with vehicular speed, weight, and length restrictions;” or

2. Provide alternative action (ROLL CALL VOTE)
Background:

Funded by a United States Economic Development Administration (EDA) grant, the Town of Paradise (Town) has developed the Town of Paradise Transportation Management Plan (TMP).

Approved by the Town Council in 2022, the TMP is a comprehensive effort to evaluate transportation and economic needs and develop recommendations to support recovery following the 2018 Camp Fire. The TMP included extensive public engagement and ranges in topics including daily and emergency evacuation traffic needs, transportation safety, active transportation, economic analysis, community design standards, engineering details and reestablishment of survey monuments and benchmarks.

The compiled TMP includes reports and plans developed through the EDA grant, that will guide the Town’s Camp Fire recovery by recommending transportation initiatives and strategies consistent with the Town of Paradise Long Term Community Recovery Plan (LTCRP) and updates.

The supplemental tasks to the TMP included an analysis of the alternatives to Honey Run Road for consideration in evaluating the re-opening of the roadway.

Due to safety impacts on the roadway following the 2018 Camp Fire, Honey Run Road has remained closed post-fire. Although the historic road was already in poor condition due to lack of funding for maintenance, it’s historic nature, and limited access pre-fire, the roadway was further impacted by post-fire hazardous tree removal and associated heavy equipment loading on the road. As the Town performed studies and sought funding to repair roadways, Honey Run 1888
2 Road remained open within Butte Creek Canyon in Butte County limits only, where the roadway was not impacted.

In alignment with the Long-Term Community Recovery Plan (LTCRP), the Transportation Master Plan (TMP) surveyed the community to determine the desired use of Honey Run Road. Reopening Honey Run Road was identified as the priority (with safety improvements of approximately $80,000, which garnered 63% of the responses), over the other presented alternatives (restrictions on lanes (13%), limit direction of travel (13%), full road closure (6%), “other” (6%)).

Staff engaged the Transportation Master Plan consultants to prepare a memorandum presenting the improvements that could be made to increase safety on Honey Run Road. Initially, the team evaluated the minimal safety improvements in the estimated range of $80,000. This option included evaluation of guardrail at the five narrowest sections of Honey Run Road within the Town limits. The repaving costs already funded in the Off System Roads project were not included in the cost estimate; the Off System Road repaving separately rehabilitates Honey Run Road to pre-fire widths of approximately nine feet of travelled way, through the FHWA funded project (2023 Town Paving Plan). Although establishing guardrail at these five narrow sections would increase safety in those roadway cross sections only and is in alignment with the survey response and estimated costs, these minimal improvements are not feasible due to current standards for guardrail termination/safety. Sufficient length and width on the roadway are required to terminate the guardrail before and after the narrow sections. This is required to ensure the guardrail is not a safety hazard. Thus, the desired, minimal improvement of $80,000 was determined by Staff to be infeasible due to the additional improvements and costs that are necessary for increased guardrail lengths and roadway width improvements it would trigger to maintain two-way traffic (guardrail would narrow the road without additional wall/embankment improvements and costs).

Staff directed the TMP consultants to evaluate additional alternatives to compare to re-opening Honey Run in its existing condition. These alternatives are presented in the Honey Run TMP memorandum.

To meet current roadway design and safety requirements, the following options were presented:

Alternative Roadway Option Estimated Cost Stakeholder Support

1. Two-Way Roadway $6.1M Yes

2. One-Way Southbound Only Roadway $4.4M No

3. Emergency Roadway Only $4.4M No

4. Motor Vehicle Traffic Prohibited $1.9M No
The alternatives presented are significantly more expensive than the community identified desire to re-open Honey Run road with an investment of $80,000 (estimated at the time of the survey, which included guardrail at only the narrow sections). It was determined by Staff that the costs in the alternatives are not in alignment with the survey responses received and level of investment desired by the community, and the alternatives are not supported by other 1889
3 stakeholders (County residents, Butte County Public Works, Cal Fire, Paradise Police Department). Additionally, it should be noted that the Town staff heard from the biking community via Chico Velo, who utilizes Honey Run Road as a cycling route, that their preference was to limit local traffic by establishing two-way bicycle traffic only, or two-way bicycle traffic with emergency vehicle access. These suggested options did not have stakeholder support at the Town, County or other stakeholder level, and were not carried forward, but are feasible to pursue if additional support for these options were presented by project stakeholders.

Please see the September 16, 2022 Honey Run Roadway Alternatives Evaluation by Mark Thomas.

On October 11, 2022, Paradise Town Council heard staff updates and public comments on the issue and directed staff to continue forward and request Butte County partner with the Town for the proposed resolution adoption for the Honey Run corridor between Merlin Lane and Town Limits as well as a collaborative approach to properly install signage regulating size, weight and speed restrictions of the roadway.

Analysis:

Following direction given by the Paradise Town Council on October 11, 2022, staff immediately contacted Butte County Public Works to explore feasibility of a concurrent action by the County Board of Supervisors. Butte County Public Works indicated a strong commitment to work with Town staff and install specialty advanced signage, including turnaround warnings for large trucks, to protect the safety of all roadway users. Butte County also indicated their section of Honey Run Road does not require a special designation due to the potential of setting unnecessary precedence in comparison to other active County roads.

With this information in mind, staff proposes the following course of action:

1. Paradise Town Council adopts a resolution expressing a desire to reopen Honey Run Road between Town Limits and Honey View Terrace as a Historical Community Route with vehicular speed, weight, and length restrictions

2. Town of Paradise finalizes bid packages to advertise planned road rehabilitation, including Honey Run Road between Town Limits and Honey View Terrace

3. Paradise and Butte County Public Works collaboratively design and install a series of signs leading to entrances of the Honey Run corridor between Merlin Lane and Honey View Terrace which provide opportunities for turnarounds, advanced warning and regulations of speed, weight and length restrictions

4. Town of Paradise performs road rehabilitation activities

5. Paradise and Butte County jointly reopen Honey Run Road, estimated mid-2023. 1890
4 Environmental Analysis:

The Town of Paradise Transportation Master Plan is considered exempt from CEQA pursuant to Public Resources Code 21080(b)(3) Projects undertaken, carried out, or approved by a public agency to maintain, repair, restore, demolish, or replace property or facilities damaged or destroyed as a result of a disaster in a disaster-stricken area in which a state of emergency has been proclaimed by the Governor pursuant to Chapter 7 (commencing with Section 8550) of Division 1 of Title 2 of the Government Code.

Financial Impact:

There is no financial impact by passing this Resolution. Existing Town Staff will implement the Resolution within the FHWA funded and locally matched Off System Roadway repaving project. 1891
1 OF 9

MEMORANDUM
To: Marc Mattox, PE Project No.: SA-21111
Cc: Ashley Stanley, PE
From: Paul Martin, PE, TE
Date: September 16, 2022
RE: Honey Run Roadway Alternatives Evaluation
As requested by the Town of Paradise, we have prepared this memorandum discussing the current conditions of Honey Run Road and engineering considerations to re-open the roadway to public use following the 2018 Camp Fire.

Study Area
Honey Run Road parallels Skyway, traveling within Butte Creek Canyon and adjacent to Butte Creek, before ascending in grade to the elevated ridge area where the Town of Paradise is located. Honey Run Road traverses a length of approximately 9.75 miles between Skyway in unincorporated Butte County near State Route 99 (SR-99), at its west end, and Skyway in the Town of Paradise north of Pearson Road, at its east end. The westerly 6.5 miles of the roadway parallels the creek with gentle curves and minor grades. Around mile 6.5, the roadway narrows, and the centerline striping is omitted to convey slower travel speeds and heightened caution for opposing traffic.

The roadway begins to rise in grade higher than Little Butte Creek as it ascends towards the Town of Paradise with curves becoming sharper and more frequent. Around 8.0 miles, the roadway enters the Town of Paradise, and around mile 9.75, Honey Run terminates at Skyway north of Pearson Road. This memorandum focuses on the

1.75-mile length of Honey Run within the Town of Paradise. Refer to Attachment A showing the project study location.

Current Roadway Layout
Honey Run Road before the Camp Fire typically has provided for two-way vehicular travel linking unincorporated Butte County with the Town of Paradise. The roadway is historically popular with cyclists given the length, natural beauty, and low motor vehicle traffic volumes.

Honey Run Road is an older roadway and has not been constructed to modern engineering standards; as a result, it is typically lacking the following elements:

1. Structural base under the asphalt paving.

2. Guardrails to minimize severity of potential errant vehicles leaving the roadway. Note that prior to the Camp Fire, trees provided a de-facto guardrail treatment. These trees were impacted by the fire or post fire hazard removal and are no longer providing slope stabilization or protection from leaving the roadway.

3. Graded or paved shoulders.

4. Motorist turnaround areas to change direction.

5. Wider roadway areas for passing of stopped, parked, or immobilized vehicles. 1892
2 OF 9
There is currently a soft closure in effect via signage at the intersection of Honey Run Road and Honey View Terrace within the Town of Paradise, for traffic leaving town and traveling westerly towards Butte County. The road closure is in place due to the Camp Fire impacts to the road and trees. Since the roadway has been signed as closed, typical daily traffic volumes cannot be measured.