Cities Index.
Agenda packet, regular meeting

Patterson City Council
August 16, 2022

Document
Agenda packet, regular meeting
Meeting
August 16, 2022
Body
Patterson City Council
Pages
84
Original file
178.9 MB
Text extracted from the city's file for reading and search. Open the original on pattersonca.iqm2.com. That file is the official record.

Rule 2301
While the Climate Change Action Plan indicated that the GHG emission reduction program would be called the San Joaquin Valley Carbon Exchange, the District incorporated a method to register voluntary GHG emission reductions into its existing Rule 2301-Emission Reduction Credit Banking through amendments of the rule. Amendments to the rule were adopted on January 19, 2012. The purposes of the amendments to the rule include the following:

Provide an administrative mechanism for sources to bank voluntary GHG emission reductions for later use.

Provide an administrative mechanism for sources to transfer banked GHG emission reductions to others for any use.

7.2.c
Packet Pg. 593 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-34 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Define eligibility standards, quantitative procedures, and administrative practices to ensure that banked GHG emission reductions are real, permanent, quantifiable, surplus, and enforceable.

Local
City of Patterson
The City of Patterson has not yet adopted a Climate Action Plan. However, policies and goals related to climate change are included in the Air Resources and Climate Change Element of the City’s General Plan, adopted on November 30, 2010. General Plan goals and policies relevant to GHG emissions include, but are not limited to, the following:

AR-7.4 Greenhouse gas emissions from new development. The City shall implement measures to reduce the emission of greenhouse gases from new development. Such measures may include, but are not limited to, the following:

Discouraging auto-dependent patterns of development;
Promoting compact, mixed-use, pedestrian-friendly, and transit-oriented development; Promoting energy-efficient building design and site planning using either Build It Green and LEED™ Silver standards for residential and non-residential buildings, respectively; and
Working to improve the ratio of jobs to housing.

3.7.4 - Thresholds of Significance
According to the CEQA Guidelines’ Appendix G Environmental Checklist, to determine whether greenhouse emissions impacts are significant environmental effects, the following questions are analyzed and evaluated. Would the project:
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
b) Conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases?
c) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? d) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency?

3.7.5 - Methodology
GHG Emissions Generation Calculation Methodology
The emission estimates were developed consistent with the proposed land uses and construction schedule in Chapter 2, Project Description. The California Emissions Estimator Model (CalEEMod) version 2016.3.2 was used to estimate the proposed project’s construction and operation-related

7.2.c
Packet Pg. 594 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-35
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx GHG emissions. CalEEMod was developed in cooperation with air districts throughout the State and is designed as a uniform platform for government agencies, land use planners, and environmental professionals to quantify potential GHG emissions associated with construction and operation from a variety of land uses.

Construction
Construction emissions can vary substantially from day to day, depending on the level of activity, the specific type of operation, and prevailing weather conditions. Construction-related GHG emissions result from on-site and off-site activities. On-site GHG emissions principally consist of exhaust emissions from heavy-duty construction equipment. Off-site GHG emissions would occur from motor vehicle exhaust from material delivery vehicles and construction worker traffic. However, unlike air quality emissions that have both localized and regional impacts, GHG emissions are evaluated based on the total emissions generated. The construction parameters used to estimate the proposed project’s construction-related GHG emissions were based on CalEEMod default assumptions. Full assumptions are detailed in the CalEEMod modeling output contained in Appendix C.

Operation
Operational GHG emissions are those GHG emissions that occur during operation of the proposed project. The major sources and operational parameters used to estimate the proposed project’s operation-related GHG emissions are summarized below. Full assumptions are detailed in the CalEEMod modeling output contained in Appendix C.

Motor Vehicles
Motor vehicle emissions refer to exhaust and road dust emissions from the automobiles that would travel to and from the project site. The emissions were estimated using CalEEMod. The weekday and Saturday trip generation rates for operations associated with the project were obtained from the transportation impact assessment (included in Appendix C). As weekend trips were not explicitly stated in the transportation impact assessment, weekday trip generation rates were applied to both Saturday and Sunday trips. This presents a conservative analysis because the Saturday and Sunday trip generation rates in the ITE Manual, 10th Edition for mid-rise multi-family housing (ITE Land Use Code 221) are lower than the weekday trip generation rate.

Pass-by trips are made as intermediate stops on the way from an origin to a primary trip destination without a route diversion. Pass-by trips are attracted from traffic passing the project on an adjacent street or roadway that offers direct access to the generator. Pass-by trips are not diverted from another roadway. The CalEEMod defaults pass-by trips were used for this analysis.

The CalEEMod default trip lengths for an urban setting for Stanislaus County were used in this analysis. The vehicle fleet mix is defined as the mix of motor vehicle classes active during the operation of the project. Emission factors are assigned to the expected vehicle mix as a function of vehicle class, speed, and fuel use (gasoline and diesel-powered vehicles). The CalEEMod default vehicle fleet mix for Stanislaus County was used for this analysis.

7.2.c
Packet Pg. 595 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-36 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Landscape Equipment
The use of landscaping equipment (leaf blowers, chain saws, mowers) would generate GHG emissions as a result of fuel combustion based on assumptions in CalEEMod.

Electricity
The project will be served by Turlock Irrigation District. For the purpose of estimating GHG emissions for this analysis, emission factors from Turlock Irrigation District were used. Turlock Irrigation District provides estimates of its emission factor per megawatt hour of electricity delivered to its customers.

Turlock Irrigation District emissions factor for 2017 for CO2 is provided below. The rates for carbon dioxide are based on compliance with the Renewable Portfolio Standard.

Carbon dioxide: 790 lb/MWh
Methane: 0.029 lb/MWh
Nitrous oxide: 0.006 lb/MWh
The factors listed below were applied in estimating emissions for the year 2022.

Carbon dioxide: 519.59 lb/MWh
Methane: 0.029 lb/MWh
Nitrous oxide: 0.006 lb/MWh
SB 350 requires an increase in the amount of electricity procured from renewable energy sources from 33 percent to 50 percent by 2030. Therefore, the adjusted Turlock Irrigation District CalEEMod emission factors are shown below for the year 2030. SB 100 requires utilities to achieve a 60 percent renewable portfolio by 2030. The reductions from SB 100 have not been estimated.

Carbon dioxide: 387.76 pound per megawatt hour (lb/MWh) Methane: 0.022 lb/MWh
Nitrous oxide: 0.005 lb/MWh
CalEEMod has three categories for electricity consumption: Title 24-electricity; non-Title 24- electricity; and lighting. Title 24-electricity uses are defined as the major building envelope systems covered by California’s Building Code Title 24 Part 6, such as space heating, space cooling, water heating, and ventilation. Lighting is separate since it can be both part and not part of Title 24. Since lighting is not part of the building envelope energy budget, CalEEMod does not consider lighting to have any further association with Title 24 references in the program. Non-Title 24-electricity includes everything else such as appliances and electronics. To properly divide the total electricity consumption into the three categories, the percentage for each category is determined by using percentages derived from the CalEEMod default electricity intensity. The percentages are applied to the electricity consumption to obtain the values used in the analysis.

7.2.c
Packet Pg. 596 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-37
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Natural Gas
There would be emissions from the combustion of natural gas used for the project (water heaters, heat, etc.). CalEEMod has two categories for natural gas consumption: Title 24-natural gas, and nonTitle 24-natural gas. For purposes of this analysis, CalEEMod defaults were used.

Water and Wastewater
GHG emissions are emitted from the use of electricity to pump water to the project site and to treat wastewater. CalEEMod default values were used in the analysis.

Solid Waste
GHG emissions would be generated from the decomposition of solid waste generated by the project.

CalEEMod was used to estimate the GHG emissions from this source. The CalEEMod default for the mix of landfill types is as follows:

Landfill no gas capture—6 percent;
Landfill capture gas flare—94 percent;
Landfill capture gas energy recovery—0 percent.

Vegetation
Zacharias Master Plan - This planning area contains agricultural land (orchards and row crops).

Baldwin Master Plan - This planning area contains agricultural land (orchards) There is currently some degree of carbon sequestration occurring on-site from existing agriculture.

While the existing landscaping and trees would be removed, the project plan would include 62.7 acres of parks. This would provide on-site carbon sequestration. It was conservatively assumed that the loss and addition of carbon sequestration would be balanced; therefore, emissions due to carbon sequestration were not included.

Life Cycle Emissions
An upstream GHG emissions source (also known as life cycle emissions) refers to emissions that are generated during the manufacturing and transportation of products that would be utilized for construction. Upstream emission sources for construction include but are not limited to GHG emissions from the manufacturing of cement and steel as well as from the transportation of building materials to the seller of such products. The upstream emissions associated with implementation of the project are difficult to estimate because (1) upstream emissions are not within the control of the project and (2) the information is not readily available. Therefore, to characterize these emissions would be speculative, and upstream emissions associated with construction have not been estimated as part of this impact analysis. Additionally, the California Air Pollution Control Officers Association (CAPCOA) White Paper on CEQA and Climate Change supports this approach by stating, “The full life-cycle of GHG emissions from construction activities is not accounted for . . . and the information needed to characterize [life-cycle emissions] would be speculative at the CEQA analysis level.” Therefore, pursuant to CEQA Guidelines Sections 15144 and 15145, upstream/life cycle emissions are speculative, and is not further discussed as part of this impact analysis.

7.2.c
Packet Pg. 597 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-38 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx GHG Emissions Reduction Plan Consistency Determination Methodology In determining whether a project or plan conflicts with any applicable plan, policy, or regulation, the CNRA has stated that in order to be used for the purpose of determining significance, an applicable plan, policy, or regulation must contain specific requirements that result in reductions of GHG emissions to a less than significant level. The project is assessed for its consistency with the ARB’s adopted the ARB’s adopted 2017 Climate Change Scoping Plan Update. Consistency would be achieved with an assessment of the project’s compliance with applicable Scoping Plan measures.

Since project buildout will be after 2030, a quantitative assessment was prepared to determine if project emissions at project buildout in 2040 would show reasonable progress toward achieving the State’s 2050 goal of reducing emissions 80 percent below 1990 levels.

3.7.6 - Project Impacts and Mitigation Measures
This section discusses potential impacts associated with the project and provides mitigation measures where necessary.

GHG Emissions Generation
Impact GHG-1: Buildout of the Master Plan would generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment.

Impact Analysis
Threshold of Significance
Section 15064.4(b) of the CEQA Guidelines’ amendments for GHG emissions states that a lead agency may take into account the following three considerations in assessing the significance of impacts from GHG emissions.

Consideration No. 1: The extent to which the project may increase or reduce greenhouse gas emissions as compared to the existing environmental setting.

Consideration No. 2: Whether the project emissions exceed a threshold of significance that the lead agency determines applies to the project.

Consideration No. 3: The extent to which the project complies with regulations or requirements adopted to implement a statewide, regional, or local plan for the reduction or mitigation of greenhouse gas emissions. Such regulations or requirements must be adopted by the relevant public agency through a public review process and must include specific requirements that reduce or mitigate the project’s incremental contribution of greenhouse gas emissions. If there is substantial evidence that the possible effects of a particular project are still cumulatively considerable notwithstanding compliance with the adopted regulations or requirements, an EIR must be prepared for the project.

The Master Plan analysis is based on a 20-year buildout with construction being completed in 2040.

The latest legislated GHG reduction targets are from SB 32 with a 2030 target of reducing emissions 40 percent below 1990 levels. The strategy to achieve the 2030 targets is included in the ARB 2017 Scoping Plan. Executive Order S-3-05 includes a goal of reducing emissions by 80 percent below 1990 levels by 2050. Since the project will start construction after the 2020 AB 32 target year, no

7.2.c
Packet Pg. 598 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-39
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx assessment of consistency with the 2020 target is required. The ARB reports that emissions were below the 2020 target level in 2016 and 2017, so it is assumed that emissions will continue to stay below the 2020 target at the end of 2020. Since the project is expected to be completed 10 years after the 2030 target year, consistency is based on progress toward achieving the Governor’s 2050 goal between 2030 and 2050. Achieving the 2050 goal will require an average annual emission reduction of 2.7 percent per year between 2020 and 2050. To maintain this trajectory, the statewide inventory must be reduced by 40 percent by 2030 to 260 MMTCO2e and 53 percent by 2040 to 201 MMTCO2e. The methodology for determining the amount of reductions required as a fair share from development projects to help achieve the targets is discussed below.

The City of Patterson has not adopted its own GHG thresholds or prepared a Climate Action Plan that can be used as a basis for determining project significance, although it has a Sustainability Action Plan, which is a non-qualifying GHG reduction plan. The Valley Air District’s Guidance for Valley Landuse Agencies in Addressing GHG Emission Impacts for New Projects under CEQA includes thresholds based on whether the project will reduce or mitigate GHG levels by 29 percent from BAU levels compared with 2005 levels to achieve the 2020 target, but has not been updated to include targets for 2030 or later. Therefore, this analysis is based on consistency with the SB 32 2030 targets and the 2017 Scoping Plan and progress toward achieving the Governors Executive Order S-3-05 2050 goal.

The use of a reduction from BAU threshold is one approach that can be used if the reduction amount is supported by substantial evidence and accounts for local differences in emission sources and whether new development will provide greater reductions than existing development to comply with the Newhall Ranch Supreme Court decision. A BAU approach for 2030 and beyond has not been developed for the City of Patterson or the San Joaquin Valley; however, the statewide reductions required from development related sources and modeling using local assumptions has been used here as a threshold approach.

The 2017 Scoping Plan strategy for achieving the SB 32 targets would obtain a range of reductions from each emission sector. The plan uses ranges to account for uncertainty in technological advancements and market penetration of lower emitting transportation and energy options. The proposed plan would achieve the bulk of the reductions from Electric Power, Industrial fuel combustion, and Transportation. Cap-and-Trade would provide between 10 and 20 percent of the required reductions depending on the amounts achieved by the other reduction measures. This approach makes determining a community level or a project level target difficult. The GHG emission reductions by Scoping Plan sector are provided in Table 3.7-4.

Table 3.7-3: 2017 Scoping Plan Update Estimated Change in GHG Emissions by Sector Scoping Plan Sector
Emissions (MMTCO2e per year)
1990
2030 Proposed Plan
Ranges
Percent Change form
1990
Agriculture 26 24–25 -4 to -8
Residential and Commercial 44 38–40 -9 to -14
Electric Power 108 42–62 -43 to -61

7.2.c
Packet Pg. 599 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-40 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Scoping Plan Sector
Emissions (MMTCO2e per year)
1990
2030 Proposed Plan
Ranges
Percent Change form
1990
High GWP 3 8–11 167 to 267
Industrial 98 77–87 -11 to -21
Recycling and Waste 7 8–9 14 to 29
Transportation (including TCU) 152 103–111 -27 to -32
Net Sink -7 TBD TBD
Subtotal 431 300–345 -20 to -30
Cap-and-Trade Program N/A 40–85 N/A
Total 431 260 -40
Source: ARB 2017 Scoping Plan Update (ARB 2017c).

Emissions from development projects are heavily weighted to transportation/mobile sources and energy use. Mobile sources comprise 59 percent of the project’s 2040 inventory. Energy use comprises 32 percent of the project’s inventory. The remaining sources comprise only 9 percent of the inventory. The reductions from the 1990 inventory estimated in the 2017 Scoping Plan for electric power are 43 to 61 percent and for transportation are 27 to 32 percent in 2030. The percentage reductions from the overall statewide inventory from electricity and transportation are from 56 to 67 percent. Therefore, the largest sources of emissions in development projects will also be subject to the most regulatory measures that are relied upon to achieve the target. The 2017 Scoping Plan includes the following summary of its overall strategy for reaching the 2030 target:

SB 350
- Achieve 50 percent RPS by 2030. (Currently 60 percent with SB 100 RPS revisions) - Doubling of energy efficiency savings by 2030.

Low Carbon Fuel Standard
- Increased stringency (reducing carbon intensity 18 percent by 2030, up from 10 percent in 2020). (Amended by ARB to 20 percent effective January 1, 2019) Mobile Source Strategy (Cleaner Technology and Fuels Scenario) - Maintaining existing GHG standards for light- and heavy-duty vehicles. - Put 4.2 million zero-emission vehicles (ZEVs) on the roads. - Increase ZEV buses, delivery and other trucks.

Sustainable Freight Action Plan
- Improve freight system efficiency.
- Maximize use of near-zero emission vehicles and equipment powered by renewable energy. - Deploy over 100,000 zero-emission trucks and equipment by 2030.

7.2.c
Packet Pg. 600 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-41
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Short-Lived Climate Pollutant (SLCP) Reduction Strategy - Reduce emissions of methane and hydrofluorocarbons 40 percent below 2013 levels by 2030. - Reduce emissions of black carbon 50 percent below 2013 levels by 2030.

SB 375 Sustainable Communities Strategies
- Increased stringency of 2035 targets.

Post-2020 Cap-and-Trade Program
- Declining caps, continued linkage with Québec, and linkage to Ontario, Canada. - ARB will look for opportunities to strengthen the program to support more air quality cobenefits, including specific program design elements. In Fall 2016, ARB staff described potential future amendments including reducing the offset usage limit, redesigning the allocation strategy to reduce free allocation to support increased technology and energy investment at covered entities and reducing allocation if the covered entity increases criteria or toxics emissions over some baseline.

By 2018, develop Integrated Natural and Working Lands Action Plan to secure California’s land base as a net carbon sink.

Work is underway by members of the AEP Climate Change Committee to determine the share of development related emissions included in the 2017 Scoping Plan inventory for use in developing targets for climate action plans and project level analysis. Preliminary results indicate that the development related portion including reductions from Cap and Trade is 158 MMT CO2e per year or a per capita emission amount of 3.6 MT CO2e per person in 2030. The statewide target inventory including all sources is 260 MMT CO2e in the 2030 target year or 5.9 MT CO2e per person. Although the results have not been released, they provide a preliminary number that is used here to illustrate the scale of reductions required. By 2040, the development related inventory will need to decline to 201 MMT CO2e or 2.8 MT CO2e per person to make steady progress toward the 2050 goal. The Baldwin / Zacharias Master Plans include residential, commercial, and industrial uses providing a mix of development that is comparable to those in statewide development inventory. Therefore, a threshold based on achieving reductions less than or equal to the per capita rate required to achieve the SB 32 target and to make reasonable progress toward achieving the 2050 goal by 2040 would provide a valid quantitative threshold when used in conjunction with additional qualitative analysis for consistency with the 2017 Scoping Plan.

The California Supreme Court in the Newhall Ranch decision was concerned that new development may need to do more than existing development to reduce GHGs to demonstrate that it is doing its fair share of reductions. As will be shown below, new development does do more than existing development and, due to the nature of the sources of GHG emissions related to development, existing development is equally responsible for reducing emissions from the most important sources of emissions. It is important to note that most of the State’s regulatory program applies to new and existing development.

The State’s regulatory program is able to target both new and existing development because the two most important strategies—motor vehicle fuel efficiency and emissions from electricity generation— obtain reductions equally from existing and new development. This is because all vehicle operators

7.2.c
Packet Pg. 601 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-42 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx use cleaner low carbon fuels and buy vehicles subject to the fuel efficiency regulations, and all building owners or operators purchase cleaner energy from the grid that is produced by increasing percentages of renewable fuels. This includes regulations on mobile sources such as: The Pavley standards that apply to all vehicles purchased in California, the LCFS that applies to all fuel used in California, and the Renewable Portfolio Standard and Renewable Energy Standard that apply to utilities providing electricity to all California homes and businesses. The reduction strategy where new development is required to do more than existing development is building energy efficiency and energy use related to water conservation regulations. For example, new projects are subject to Title 24 Energy Efficiency standards and CALGreen Code and Model Water Efficient Landscape Ordinance (MWELO) water conservation requirements. Residential buildings constructed to the 2013 Title 24 standards use 25 percent less energy than buildings complying with the 2008 standards. 2016 Title 24 improved energy efficiency in residential buildings by 28 percent compared to the 2013 Title 24 standards and 46 percent compared with 2008 Title 24 standards. New buildings and landscapes are much more energy efficient and water efficient than the development that has been built over the past decades and will require much less energy. The 2019 Title 24 standards which became effective in January 2020 makes progress toward achieving net zero energy use through requirements for onsite renewable generation for most projects. The project buildings would be constructed after 2020 and would be required to comply with 2019 Title 24 standards. Additional reductions can be expected with next versions of Title 24 until net zero energy use is achieved.

The project analysis also includes a qualitative assessment of compliance with Scoping Plan strategies to support GHG significance findings under Impact GHG-2. There are no measures that identify specific requirements on development projects, but the analysis shows how the applicable measures affect project emission sources.

Construction
Total GHG emissions generated during all years of construction were estimated using CalEEMod 2016.3.2 and are presented in Table 3.7-4. Construction emissions were assessed based on annual average construction activity for the residential and commercial/industrial land use categories.

Separate model runs were prepared for the schools and parks since they are discrete projects and not spread out over the 20-year buildout. The annual average construction activity for residential, commercial and industrial was modeled for the year 2021 and the results were multiplied by 20 to reflect the 20-year buildout period at a steady rate of construction. The schools and parks were modeled for years 2022, and 2024. Using a model year early in the buildout period is a conservative assumption because emissions are expected to decrease as old construction equipment is replaced with new cleaner equipment. The Valley Air District does not recommend assessing the significance of construction-related GHG emissions. Any construction-related emissions would be temporary.

However, other jurisdictions such as the South Coast Air Quality Management District (SCAQMD) and the Sacramento Metropolitan Air Quality Management District (SMAQMD) have concluded that construction emissions should be included since they may remain in the atmosphere for years after construction is complete. Therefore, the amortized construction-related GHG emissions have been added to the operational emissions for determining significance.

7.2.c
Packet Pg. 602 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-43
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Table 3.7-4: Construction Greenhouse Gas Emissions (Annual Average and Total Project) Construction Phase
Average Annual Emissions
MT CO2e/Year
Cumulative Emissions over 20 Years
MT CO2e
Residential 1,313.58 26,271.64
Commercial/Industrial 1,042.00 20,839.93
Elementary School - 1,130.04
Middle School - 1,204.33
Parks - 445.91
Total - 49,891.85
Amortized over 30 Years - 1,663.06
Notes:

Calculation totals use unrounded numbers from CalEEMod output.

MTCO2e = metric tons of carbon dioxide equivalents
Source: CalEEMod output (Appendix A).

An additional model run was prepared for the Baldwin Master Plan area for information only. The model run uses a 2021 construction start year and the default construction schedule and equipment use in CalEEMod. The results of the modeling are provided in Table 3.7-5.

Table 3.7-5: Construction Greenhouse Gas Emissions (Baldwin Master Plan) Construction Year Emissions (MTCO2e/Year)
2021 601.41
2022 514.08
2023 507.68
2024 507.16
2025 462.88
2026 47.09
Total 2,640.31
Amortized over 30 Years 88.01
Notes:

Calculation totals use unrounded numbers from CalEEMod output.

MTCO2e = metric tons of carbon dioxide equivalents
Source: CalEEMod output (Appendix C).

Operation
Operational or long-term emissions occur over the life of the project. Sources of emissions include motor vehicles and trucks, energy usage, water usage, waste generation, and area sources, such as landscaping activities and residential wood burning. Operational GHG emissions associated with the

7.2.c
Packet Pg. 603 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-44 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx project were estimated using CalEEMod 2016.3.1. Full assumptions and CalEEMod model outputs are provided in Appendix C.
2040 Operational Emissions
Operational emissions for the 2040 buildout year were modeled using CalEEMod. CalEEMod assumes compliance with some, but not all, applicable rules and regulations regarding energy efficiency, vehicle fuel efficiency, renewable energy usage, and other GHG reduction policies. The reductions obtained from each regulation and the source of the reduction amount used in the analysis are described below.

Emissions Accounting for Applicable Regulations
The following regulations are incorporated into the CalEEMod emission factors:

Pavley I and Pavley II (LEV III) motor vehicle emission standards ARB Medium and Heavy-Duty Vehicle Regulation
2005, 2008, 2013, and 2016 Title 24 Energy Efficiency Standards The following regulations have not been incorporated into the CalEEMod emission factors and require alternative methods to account for emission reductions provided by the regulations:

Renewable Portfolio Standards
Low Carbon Fuel Standard
Green Building Code Standards (indoor water use)
California Model Water Efficient Landscape Ordinance (Outdoor Water) Pavley II/LEV III standards have been incorporated in the latest version of CalEEMod. ARB estimates a 3 percent reduction in 2020 and a 19 percent reduction from the vehicle categories subject to the regulation by 2030.

The ARB GHG Regulation for Medium and Heavy-Duty Engines and Vehicles applies to trucks that will be accessing the project site. The benefits of the regulation were incorporated into CalEEMod 2016.3.2. The ARB estimates that this regulation will reduce GHG emissions from the affected vehicles by 7.2 percent.

The LCFS is estimated to achieve a 10 percent reduction in emissions by 2020 and a 20 percent reduction by 2030. CalEEMod does not include credit for the LCFS.

Title 24 reductions for 2013 and 2016 updates were added to CalEEMod 2016.3.2. The CEC estimates that 2013 Title 24 standards would result in an increase in energy efficiency of 25 percent in residential buildings compared to 2008 Title 24. An additional 28 percent reduction from the 2008 standards have been claimed for compliance with 2016 Title 24. This results in a combined reduction of 46 percent. Compliance with 2019 Title 24 is expected to reduce residential energy use by 7 percent beyond 2016 Title 24. 2019 Title 24 requires new residential development include solar panels to generate electricity. The project will include solar panels on each residential unit in

7.2.c
Packet Pg. 604 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-45
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx quantities that meet or exceed Title 24 requirements. Non-residential projects would achieve a reduction electricity of 10.7 percent and natural gas of 1 percent compared to the 2016 standards.

RPS is not accounted for in CalEEMod 2016.3.2. Reductions from RPS are addressed by revising the electricity emission intensity factor in CalEEMod to account for the utility RPS rate forecast for 2030 to meet the 50 percent mandate. Utilities will be required by SB 100 to increase the use of renewable energy sources to 60 percent by 2030, but details on individual utility compliance have not been determined.

Energy savings from water conservation resulting from the Green Building Code Standards for indoor water use and California Model Water Efficient Landscape Ordinance for outdoor water use are not included in CalEEMod. The Water Conservation Act of 2009 mandates a 20 percent reduction in urban water use that is implemented with these regulations. Benefits of the water conservation regulations are applied in the CalEEMod mitigation component.

Reductions in emissions from solid waste are based on the City achieving the CalRecycle 75 Percent Initiative by 2020 compared with a 50 percent baseline for 2005. Reductions are taken using the CalEEMod mitigation component.

Regulations applicable to project sources and the percent reduction anticipated from each source are shown in Table 3.7-6. The percentage reductions are only applied to the specific sources subject to the regulations. For example, the Pavley Low Emission Vehicle Standards apply only to light duty cars and trucks.

Table 3.7-6: Reductions from Greenhouse Gas Regulations Regulation Project Applicability Reduction Source
Percent Reduction in
2020 and 2030
Pavley Low Emission
Vehicle Standards
Light-duty cars and trucks
accessing the site are subject
to the regulation.

CalEEMod defaults (Pavley I) 25.11
Adjusted GHG emission factor
(Pavley II/LEV III) in CalEEMod.
3% 2020

19.5% 20302
Truck and Bus
Regulation
Heavy-duty trucks accessing
the site for deliveries and
services are subject to the
regulation.

Adjusted GHG emission
factors for the regulation in
CalEEMod

7.2%3
Low Carbon Fuel
Standard (LCFS)
Vehicles accessing the site will
use fuel subject to the LCFS
CalEEMod defaults 10% 2020
18% 20301
Title 24 Energy Efficiency
Standards
Project buildings will be
constructed to meet the latest
version of Title 24 (currently
2019). Reduction applies only
to energy consumption
subject to the regulation.

CalEEMod defaults
CalEEMod mitigation
component for 2019
standards (residential)
35%4,5
7%10
Green Building Code
Standards
The project will include water
conservation features
required by the standard
CalEEMod mitigation
component
20%6

7.2.c
Packet Pg. 605 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-46 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Regulation Project Applicability Reduction Source
Percent Reduction in
2020 and 2030
Water Efficient Land Use
Ordinance
The project landscaping will
comply with the regulation
CalEEMod mitigation
component
20%7
Renewable Portfolio
Standard (RPS)
Electricity purchased for use
at the project site is subject to
the 50 percent RPS mandate
CalEEMod adjusted energy
intensity factors based on TID
achieving the 50 percent
mandate.
50%8
Solid waste The solid waste service
provider will need to provide
programs to increase
diversion and recycling to
meet the 75 percent
mandate.

CalEEMod mitigation
component
25%9
Notes:

Regulations are described in Section 2.3 Regulatory Environment. The source of the percentage reductions from each measure are from the following sources:
1 Pavley 1 + Low Carbon Fuel Standard Postprocessor Version 1.0 User’s Guide (ARB 2010b) 2 ARB Staff Report for LEV III Amendments (ARB 2013e)
3 ARB Staff Report for GHG Regulations for Medium and Heavy-Duty Engines and Vehicles (ARB 2013f) 4 California Energy Commission News Release: New Title 24 Standards Will Cut Residential Energy Use by 25 Percent, Save Water, and Reduce Greenhouse Gas Emissions (CEC 2014b) 5 California Energy Commission Adoption Hearing Presentation: 2016 Buildings Energy Efficiency Standards (CEC 2015) 6 2013 California Green Building Standards Code Section 5.303.2 (CBSC 2013) 7 California Water Plan Update 2018 (CDWR 2018)
8 Based on CalEEMod default TID rate for 2005 and achieving the 50 percent mandate by 2030 9 CalRecycle 75 Percent Initiative: Defining the Future (CalRecycle 2016b) 10 2019 Building Energy Efficiency Standards Frequently Asked Questions (CEC 2018).

It is important to note that reductions listed in Table 3.7-6 do not include new strategies proposed in the 2017 Scoping Plan Update. The plan was adopted in December 2017. The plan provides alternatives in terms of their likelihood of implementation and ranges of reduction from the strategies. Measures already authorized by legislation are highly likely to be implemented, while measures requiring new legislation are less likely to go forward. The State is highly likely to incorporate zero net energy buildings in future updates to Title 24 and now requires solar panels in most residential development. A new round of motor vehicle fuel efficiency standards beyond 2025 when LEV III standards are at their maximum reduction level is highly likely. Changing heavy-duty trucks and off-road equipment to alternative fuels face greater technological hurdles and are less likely to provide dramatic reductions by 2030. Reductions from achieving 60 percent RPS by 2030 have not been included in this analysis.

In addition to rules and regulations, the project will provide design features and infrastructure encouraged by General Plan policies and City of Patterson design standards that would reduce project vehicle miles traveled compared to default values. Note that CalEEMod nominally treats these design elements and conditions as “mitigation measures,” despite their inclusion in the project description. Therefore, reported operational emissions are considered to represent unmitigated project conditions.

7.2.c
Packet Pg. 606 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-47
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx The GHG emission analysis for the Baldwin / Zacharias Master Plan was separated into 5 different model runs. These include residential, commercial/industrial, elementary school, middle school, and parks. The model runs for residential and commercial/industrial reflect the cumulative project buildout in 2040. The model runs for the schools and parks were run as discrete projects with a 2040 operation year to match the buildout year for the entire project. An additional run for only the Baldwin Master Plan was run for information only. The emissions for each component were added to determine the total emissions at buildout from all Master Plan land uses.

Full assumptions and model outputs are provided in Appendix C. Results of this analysis are presented in Table 3.7-7.

Table 3.7-7: Project Operational Greenhouse Gases 2040
MT CO2e/Year
Source Residential
Commercial/
Industrial
Elementary
School
Middle
School Parks
Project
Buildout
Area 2,456.58 0.15 0.01 0.02 0.00 2,456.76
Energy 10,890.79 25,223.25 111.41 273.73 0.00 36,499.17 Mobile 24,452.97 42,289.48 315.50 694.86 198.30 67,951.11 Waste 1,129.54 3,261.97 34.42 82.60 2.03 4,510.55
Water 773.65 3,100.15 3.79 8.53 36.85 3,922.96
Total 39,703.52 73,875.00 465.12 1,059.74 237.18 115,340.55 Amortized
Construction
Emissions
1,663.06
Total with
Construction
117,003.61
Project Population 19,988
Project Per Capita
Emissions

5.85 Per Capita
Emissions
Threshold for 2040

2.79 Are emissions
potentially
significant?
Yes
Notes:

MTCO2e = metric tons of carbon dioxide equivalents
Source: CalEEMod model output (Appendix C).

As shown in Table 3.7-8, the project would result in emissions of 5.9 MT CO2e per person compared to the threshold of 2.8 MT CO2e per person. Reducing emissions to below the threshold would

7.2.c
Packet Pg. 607 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-48 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx require additional reductions totaling 55,775 MT CO2e. The results include CalEEMod reductions for site design measures that provide credit for location near employment centers and for pedestrian infrastructure.

It is currently speculative to quantify the emissions savings from future regulatory measures, as they have not yet been developed; however, it can be anticipated that during the 20 year buildout period, regulations will be adopted to implement the 2017 Scoping Plan and another Scoping Plan is likely to be developed to achieve post-2030 targets. The City has no regulatory authority over the largest project source (motor vehicles); however, the project design features supporting multimodal travel such as bike paths, pedestrian connections, and transit service will result in decreases in VMT consistent with SB 375 requirements for 2035. New residences located within the Master Plan will be near net zero electricity use to comply with 2019 Title 24 standards when reductions from solar panels is included. Nonresidential projects constructed after 2030 are likely to be constructed to near net zero standards. Additional reductions will be achieved when the electric utility achieves the 60 percent RPS mandate in 2030. The amount of reductions attributable to the project from these regulations has not been determined; therefore, project GHG emissions may exceed the per capita threshold for 2040.

The operational emissions associated with the Baldwin Master Plan are provided in Table 3.7-9. The Baldwin project includes only residential development, so emissions from commercial and industrial uses are not included. This result is lower per capita emissions compared to the full project.

Table 3.7-8: Baldwin Master Plan Operational Greenhouse Gases Emission Source Emissions (MT CO2e per year)
Area 136.70
Energy 871.05
Mobile (Vehicles) 1,721.50
Waste 118.40
Water 43.05
Total Emissions 2,890.71
Construction Emissions (Amortized over 30
Years)

88.01 Total Project Emissions 2,978.72
Population (CalEEMod) 872
Per Capita Emissions 3.42
Notes:

MT CO2e = metric tons of carbon dioxide equivalent.

Unrounded results used to calculate totals.

Source of Emissions: CalEEMod Output (Appendix C)

7.2.c
Packet Pg. 608 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-49
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx The 2017 Scoping Plan Update suggests that all new land use development implement all feasible measures to reduce GHG emissions. The Scoping Plan does not define all feasible measures or attribute an amount of reductions required from new development beyond compliance with regulations. When requiring mitigation of a project’s fair share of a cumulative impact, the Lead Agency must show the nexus between the project contribution and its fair share of mitigation to reduce the impact to less than cumulatively considerable.

The following discussion assesses the feasibility of mitigation considered for the project. Measures must exceed the amounts required by regulation in order to be considered mitigation, but for a project that has a 20-year buildout schedule, new and modified regulations applicable to project emission sources can be expected throughout the development timeframe. This creates a conflict between requirements to mitigate significant impacts to the extent feasible and requirements to mitigate only a fair share of the impact. Mitigation measures requiring projects to exceed energy efficiency standards by a certain percentage become obsolete quickly when the standards are revised every three years. Adopted standards are generally superior to mitigation measures because they are supported by technical analysis and a public review process to determine feasibility and fairness. Project mitigation measures are often applied with limited review for feasibility or by requiring applicants to prove infeasibility. When there is a well-established regulatory program in place that is intended to address the impact, going beyond the regulation circumvents the regulatory process and becomes regulation by mitigation. Therefore, no energy efficiency mitigation beyond Title 24 and the CalGreen Building Code has been included in the project.

For large Master Plans and General Plan updates it is common to rely on goals and policies to mitigate significant impacts on a programmatic basis. The 2010 General Plan includes goals and policies related to climate change that will help reduce project impacts. In addition, the City of Patterson Community Design Guidelines help ensure that projects are designed in ways that support walking, and bicycling, provide well connected streets, and provide site orientation to optimize passive solar heating and lighting and that optimizes solar energy installations. Additional design guidelines address water conservation, parking, and use of neotraditional design. By following the Design Guidelines, project implementing the Baldwin / Zacharias Master Plan will be applying the measures suggested by the 2017 Scoping Plan for land use projects. Mitigation Measure (MM) TRANS-2 requires that Transportation Demand Management measures be assessed and implemented as development occurs pursuant to the Master Plan which includes things such as pedestrian, bicycle, and transit facilities.

The project is assumed to use natural gas for space and water heating purposes. The 2017 Scoping Plan indicates that increased use of electricity for heating will be required to meet net zero energy goals. Mandating electricity for heating is best addressed through a statewide regulatory process that provides uniform standards and timelines for implementation for all development rather than as a mitigation measure.

Large industrial and commercial projects that employ more than 100 persons with arrival times during peak traffic hours are subject to Valley Air District Rule 9410 Employer Based Trip Reduction.

Employers are required to implement an Employer Trip Reduction Implementation Plan (ETRIP) for each worksite and to meet the applicable point targets specified in the Rule. Measures such as ride share programs, transportation demand management programs, on-site facilities to encourage the

7.2.c
Packet Pg. 609 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-50 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx use of alternative travel modes are among the types of measures included in the ETRIP plans.

Compliance with this rule will reduce GHG emissions from commute trips. MM TRANS-2 requires that Transportation Demand Management measures be assessed and implemented as development occurs pursuant to the Master Plan consistent with ETRIP.

Another potential mitigation option is to require developers to purchase carbon offsets to reduce emissions to less than significant levels. Carbon offset markets are being established with programs such as the Climate Action Reserve. The cost of carbon offsets is subject to market forces and the cost to develop and maintain offset projects. Projects with approved protocols include forestry, and livestock methane capture. The Master Plan would likely be developed by multiple developers over the 20-year buildout period. Each project would require its own analysis to determine its fair share of the mitigation requirement and procedures for tracking and monitoring implementation. The City and most developers do not have resources to manage such a program. In addition, as discussed earlier, the amount of mitigation required would vary depending on reductions achieved by new regulations. Requiring developers and future residents and businesses to further mitigate emissions without accounting for compliance with regulations would result in double mitigation, first by the developer and then by the residents and businesses purchasing electricity, fuel, and vehicles compliant with regulations in effect at the time of purchase and beyond that would violate constitutional nexus requirements.

In conclusion, project emissions from development prior to 2030 would not achieve the emission reduction requirements to demonstrate consistency with the 2017 Scoping Plan targets for 2030. In addition, the project would exceed the per capita threshold for development related emissions needed to demonstrate sufficient progress toward the Governor’s 2050 goal by project buildout in 2040. The development related per capita emission target for 2040 is 2.79 MT CO2e per person compared to the project per capita emissions project per capita emissions are 5.85 MT CO2e.

Mitigation measures to reduce the impact to below the threshold are not feasible. Therefore, this impact is considered significant and unavoidable.

Level of Significance Before Mitigation
Potentially significant impact.

Mitigation Measures
Implement Mitigation Measure TRANS-2.

Level of Significance After Mitigation
Significant unavoidable impact.

7.2.c
Packet Pg. 610 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-51
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Conflict with Plan, Policy, or Regulation that Reduces Emissions Impact GHG-2: Buildout of the Master Plan may conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases.

Impact Analysis
The City of Patterson has not adopted a GHG reduction plan or Climate Action Plan. In addition, the City has not completed the GHG inventory, benchmarking, and goal-setting process required to identify a reduction target and to take advantage of the streamlining provisions contained in the CEQA Guidelines amendments adopted for SB 97. The Valley Air District has adopted a Climate Action Plan, but it does not contain measures that are applicable to development projects.

Therefore, the Valley Air District Climate Action Plan cannot be applied to the project. Since no other local or regional Climate Action Plan is in place, the project is assessed for its consistency with ARB’s adopted Scoping Plan. This would be achieved with an assessment of the project’s compliance with Scoping Plan measures.

Scoping Plan
The California State Legislature adopted AB 32 in 2006 which included a goal of reducing emissions to 1990 levels by 2020. The 2008 Scoping Plan provided a strategy for achieving the AB 32 target.

The California GHG emission inventory was below the target in 2016 and 2017 and is expected to stay below the target in the 2020 milestone year. The project would begin construction after 2020; therefore, the 2008 Scoping Plan is not applicable to the project. The 2017 Scoping Plan Update provides the State’s strategy to achieve the SB 32 target of reducing GHG emissions by 40 percent below 1990 levels by 2030. The following consistency analysis applies to the 2017 Scoping Plan and later State goals.

Consistency with California’s Post-2020 Targets
The State’s executive branch adopted several Executive Orders related to GHG emissions. Executive Orders S-3-05 and B-30-15 are two examples. Executive Order S-3-05 sets goals to reduce emissions to 1990 levels by 2020 and 80 percent below 1990 levels by 2050. The goal of Executive Order S-3-05 to reduce GHG emissions to 1990 levels by 2020 was codified by AB 32. The project will be constructed after the 2020; therefore, the project does not conflict with this component of Executive Order S-3-05. Executive Order B-30-15 establishes an interim goal to reduce GHG emissions to 40 percent below 1990 levels by 2030.

The 2030 goal was codified under SB 32 and is now addressed by the 2017 Scoping Plan Update. The new plan provides a strategy that is capable of reaching the SB 32 target if the measures included in the plan are implemented and achieve reductions within the ranges expected. Under the Scoping Plan Update, local government plays a supporting role through its land use authority and control over local transportation infrastructure. The 2017 Scoping Plan includes reductions from implementation of SB 375 that applies to VMT from passenger vehicles. Stanislaus County targets for SB 375 are a 5 percent reduction by 2020 and a 10 percent reduction by 2035. SB 375 is implemented with the StanCog Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS). The RTP/SCS envisions an increase in development density that would encourage fewer

7.2.c
Packet Pg. 611 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-52 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx and shorter trips and more trips by transit, walking, and bicycling in amounts sufficient to achieve the SB 375 targets.

The Executive Order S-3-05 2050 target has not been codified by legislation. Studies have shown that, in order to meet the 2050 target, aggressive pursuit of technologies in the transportation and energy sectors, including electrification and the decarbonization of fuel, will be required. Because of the technological shifts required and the unknown parameters of the regulatory framework in 2050, quantitatively analyzing the project’s impacts further relative to the 2050 goal is speculative for purposes of CEQA (ARB 2014b).

AB 32 and now SB 32 established an emissions reduction trajectory that will allow California to achieve the more stringent 2050 target: The greenhouse gas emission reduction measures contained in the 2008 and 2017 Scoping Plans indicate that they put the State on a path to meet the long-term 2050 goal of reducing California’s GHG emissions to 80 percent below 1990 levels on a trajectory consistent with the reductions that are needed globally to stabilize the climate. Many of the emission reduction strategies adopted to achieve the AB 32 targets will continue to provide reductions that will help achieve the post-2020 targets:

Energy Sector: Continued improvements in California’s appliance and building energy efficiency programs and initiatives, such as the State’s zero net energy building goals, would serve to reduce the proposed project’s emissions level. Additionally, further additions to California’s renewable resource portfolio would favorably influence the project’s emissions level.

Transportation Sector: Anticipated deployment of improved vehicle efficiency, zero emission technologies, lower carbon fuels, and improvement of existing transportation systems all will serve to reduce the project’s emissions level.

Water Sector: The project’s emissions level will be reduced as a result of further desired enhancements to water conservation technologies.

Waste Management Sector: Plans to further improve recycling, reuse and reduction of solid waste will beneficially reduce the project’s emissions level.

For the reasons described above, the project’s emissions trajectory is expected to follow a declining trend, consistent with the 2030 and 2050 targets.

7.2.c
Packet Pg. 612 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-53
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx California’s Path to Achieving the 2050 Target
Source: ARB 2017 Scoping Plan Update (ARB 2017c)
Further, recent studies show that the State’s existing and proposed regulatory framework will allow the State to reduce its GHG emissions level to 40 percent below 1990 levels by 2030, and to 80 percent below 1990 levels by 2050. Even though these studies did not provide an exact regulatory and technological roadmap to achieve the 2030 and 2050 goals, they demonstrated that various combinations of policies could allow the statewide emissions level to remain very low through 2050, suggesting that the combination of new technologies and other regulations not analyzed in the studies could allow the State to meet the 2050 target (Energy and Economics 2015).

Given the proportional contribution of mobile source-related GHG emissions to the State’s inventory, recent studies also show that relatively new trends—such as the increasing importance of web-based shopping, the emergence of different driving patterns by the “millennial” generation, and the increasing effect of web-based applications on transportation choices—are beginning to substantially influence transportation choices and the energy used by transportation modes. These factors have changed the direction of transportation trends in recent years and will require the creation of new models to effectively analyze future transportation patterns and the corresponding effect on GHG emissions. For the reasons described above, the proposed project’s post-2020 emissions trajectory through its 2040 buildout is expected to follow a declining trend, consistent with the SB 2030 target and 2050 goal.

Consistency with SB 32
The 2017 Climate Change Scoping Plan Update (2017 Scoping Plan) includes the strategy that the State intends to pursue to achieve the 2030 targets of Executive Order S-3-05 and SB 32. The 2017

7.2.c
Packet Pg. 613 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-54 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Scoping Plan includes the following measures in Table 3.7-10 for reaching the 2030 target. As shown Table 3.7-9, the project is consistent with most of the strategies, while others are not applicable to the project.

Table 3.7-9: SB 32 2017 Scoping Plan Update Consistency Analysis Scoping Plan Measure Project Consistency
SB 350 50% Renewable Mandate. Utilities subject to
the legislation will be required to increase their
renewable energy mix from 33% in 2020 to 50% in
2030.

Consistent: The project will purchase electricity from
a utility subject to the SB 350 Renewable Mandate.

SB 350 Double Building Energy Efficiency by 2030.

This is equivalent to a 20 percent reduction from
2014 building energy usage compared to current
projected 2030 levels
Not Applicable. This measure applies to existing
buildings. New structures are required to comply with
Title 24 Energy Efficiency Standards that are expected
to increase in stringency until residential housing
achieves zero net energy.

Low Carbon Fuel Standard. This measure requires
fuel providers to meet an 18 percent reduction in
carbon content by 2030.

Consistent. Vehicles accessing the project site will use fuel containing lower carbon content as the fuel
standard is implemented.

Mobile Source Strategy (Cleaner Technology and
Fuels Scenario) Vehicle manufacturers will be
required to meet existing regulations mandated by
the LEV III and Heavy-Duty Vehicle programs. The
strategy includes a goal of having 4.2 million ZEVs on
the road by 2030 and increasing numbers of ZEV
trucks and buses.

Consistent. Project residents and businesses can be
expected to purchase increasing numbers of more
fuel efficient and zero emission cars and trucks each
year. The 2016 CALGreen Code requires electrical
service in new single-family housing and commercial
projects to be EV charger-ready. Home deliveries will
be made by increasing numbers of ZEV delivery
trucks.

Sustainable Freight Action Plan The plan’s target is to improve freight system efficiency 25 percent by
increasing the value of goods and services produced
from the freight sector, relative to the amount of
carbon that it produces by 2030. This would be
achieved by deploying over 100,000 freight vehicles
and equipment capable of zero emission operation
and maximize near-zero emission freight vehicles and
equipment powered by renewable energy by 2030.

Not Applicable. The measure applies to owners and
operators of trucks and freight operations. However,
home and business deliveries are expected to be
made by increasing number of ZEV delivery trucks.

Short-Lived Climate Pollutant (SLCP) Reduction
Strategy. The strategy requires the reduction of
SLCPs by 40 percent from 2013 levels by 2030 and
the reduction of black carbon by 50 percent from
2013 levels by 2030.

Consistent. The project will include only natural gas
hearths that produce very little black carbon
compared to woodburning fireplaces and heaters.

Businesses with large refrigeration systems are
subject the ARB Refrigeration Management Program.

SB 375 Sustainable Communities Strategies.

Requires Regional Transportation Plans to include a
sustainable communities strategy for reduction of per
capita vehicle miles traveled. The targets for Fresno
County are
Consistent. The project will provide residential
development and jobs in the region that is consistent
with the Regional Transportation Plan/Sustainable
Communities Strategy (SCS) strategy to increase
development densities to reduce VMT. The project is
not within an SCS priority area and so is not subject
to requirements applicable to those areas.

7.2.c
Packet Pg. 614 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-55
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Scoping Plan Measure Project Consistency
Post-2020 Cap-and-Trade Program. The Post 2020
Cap-and-Trade Program continues the existing
program for another 10 years. The Cap-and-Trade
Program applies to large industrial sources such as
power plants, refineries, and cement manufacturers.

Consistent. The post-2020 Cap-and-Trade Program
indirectly affects people who use the products and
services produced by the regulated industrial sources
when increased cost of products or services (such as
electricity and fuel) are transferred to the consumers.

The Cap-and-Trade Program covers the GHG emissions
associated with electricity consumed in California,
whether generated in-state or imported. Accordingly,
GHG emissions associated with CEQA projects’
electricity usage are covered by the Cap-and-Trade
Program. The Cap-and-Trade Program also covers fuel
suppliers (natural gas and propane fuel providers and
transportation fuel providers) to address emissions
from such fuels and from combustion of other fossil
fuels not directly covered at large sources in the
program’s first compliance period.

Natural and Working Lands Action Plan. The ARB is
working in coordination with several other agencies
at the federal, state, and local levels, stakeholders,
and with the public, to develop measures as outlined
in the Scoping Plan Update and the governor’s
Executive Order B-30-15 to reduce GHG emissions
and to cultivate net carbon sequestration potential
for California’s natural and working land.

Not Applicable. The project includes residential and
nonresidential development and will not be
considered natural or working lands.

Source: ARB 2017 Scoping Plan Update.

Regarding the goal for 2050 under Executive Order S-3-05, at this time it is premature to provide analysis specifically for this milestone. However, the project analysis assesses the progress needed by the 2040 project buildout year to be on track to achieving the 2050 goal. As was discussed earlier, it is not possible to quantify the benefits of strategies that are yet to be adopted. The 2017 Scoping Plan provides the first step toward achieving longer term goals with its 2030 targets and well-developed regulatory strategy supported by legislation that will help ensure that the required measures are implemented. Legislative action to mandate a 2040 or 2050 target and additional Scoping Plans to address post-2030 targets will be needed to ensure progress continues.

Although the project is consistent with 2017 Scoping Plan measures, the project would not be consistent with the 2030 targets for the portions of the project that would be built by 2030 and could conflict with implementation of the 2017 Scoping Plan if sufficient regulations implementing the 2017 Scoping Plan are not adopted to achieve the 2030 target. In addition, based on the analysis of per capita project emissions at buildout in 2040, the GHG reductions achieved by project design features and compliance with applicable regulations would not be sufficient to show steady progress toward the 2050 goal. In the First Scoping Plan Update; however, ARB generally described the type of activities required to achieve the 2050 target: “energy demand reduction through efficiency and activity changes; large scale electrification of on-road vehicles, buildings, and industrial machinery; decarbonizing electricity and fuel supplies; and rapid market penetration of efficiency and clean

7.2.c
Packet Pg. 615 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-56 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx energy technologies that requires significant efforts to deploy and scale markets for the cleanest technologies immediately.” The 2017 Scoping Plan provides an intermediate target that is intended to achieve reasonable progress toward the 2050 target by 2030. It is not possible to predict the course of future legislative action on climate change. Therefore, the project may be considered inconsistent with achieving the 2050 goal. Feasible measures are not available for the project to reduce emissions to the levels required by 2040. Therefore, this impact is considered significant and unavoidable.

Level of Significance Before Mitigation
Potentially significant impact.

Mitigation Measures
Implement Mitigation Measure TRANS-2.

Level of Significance After Mitigation
Significant and unavoidable.

Energy
Impact GHG-3: Buildout of the Master Plans would not result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation.

Impact Analysis
Appendix F of the CEQA Guidelines applies to the direct and indirect impact analysis, as well as the cumulative impact analysis. Appendix F does not prescribe a threshold for the determination of significance. Rather, Appendix F focuses on reducing and minimizing inefficient, wasteful, and unnecessary consumption of energy. Therefore, for the purposes of this EIR, a significant impact to energy would result if the project would:

1. Result in the wasteful and inefficient use of nonrenewable resources during its construction.

2. Result in the wasteful and inefficient use of nonrenewable resources during long-term operation.

3. Be inconsistent with Adopted Plans and Policies.

Construction Energy Consumption
Project construction is assumed to take 20 years to complete. Construction activities would consume energy through the operation of heavy off-road equipment, trucks, and worker traffic. Construction equipment fuel consumption for each of was based on equipment lists generated using CalEEMod default values. The construction equipment quantities and types are CalEEMod values for each type of development in the Master Plan. The fuel consumption of off-road equipment calculated in this analysis is based on a SCAQMD estimated fuel consumption rate of 0.05 gallons per horsepower hour and the horsepower, usage hours, and load factors from CalEEMod model runs prepared for the project’s air quality analysis.

7.2.c
Packet Pg. 616 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-57
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Based on the information in Table 3.5-2 and the anticipated construction schedule, construction equipment would result in the consumption of approximately 534,755 gallons of diesel fuel over the entire 20-year construction period.

Worker, vendor, and haul trips would result in approximately 3,056,220 VMT over the entire construction period. A countywide average fuel consumption of 21.1 mpg obtained from EMFAC 2017 was used to determine fuel consumption from worker, vendor, and haul trips. As a result, construction worker, vendor, and haul trips would consume approximately 144,845 gallons of motor vehicle fuel during the entire 20 years of construction.

Although the proposed project would result in the consumption of an estimated 534,755 gallons of diesel and 144,845 gallons of motor vehicle fuels during construction, the project is expected at to achieve energy efficiencies typical for residential and non-residential projects in California.

Construction equipment fleet turnover and increasingly stringent state and federal regulations on engine efficiency combined with local, state, and federal regulations limiting engine idling times and require recycling of construction debris, would further reduce the amount of transportation fuel demand during project construction. Considering these reductions in transportation fuel use, the proposed project would not result in the wasteful and inefficient use of energy resources during construction and impacts would be less than significant. Detailed modeling results are provided in Appendix C.

Operation Energy Consumption
Long-term energy consumption associated with the project includes electricity and natural gas consumption by residents and the commercial and industrial portions of the project. Energy is also used for water conveyance, and long-term vehicle operations from residents and businesses.

Electricity and Natural Gas Consumption
During operations the proposed project would consume natural gas for space heating, water heating, and cooking associated with the land uses on the project site. The natural gas consumption was estimated for each of the project’s land uses based on the CalEEMod default values. The results of the analysis indicate that the project would consume approximately 196,852,440 thousand British thermal units (kbtu) per year of natural gas per year during operation.

In addition to the consumption of natural gas, the proposed project would use electricity for lighting, appliances, and other uses associated with the project’s land uses. Electricity use during operations was estimated using CalEEMod default values for project’s specific land uses. The results of the modeling indicate that the project would use approximately 142,260,106 kilowatt-hours (kWh) of electricity per year. 2019 Title 24 requires the installation of solar panels in residential developments. The amount installed can vary due to local conditions and project design. In addition, some projects may use community solar installations instead of roof top solar. Although, the energy estimates assume no solar will be installed, most electricity used by the residential portions of the project is expected to be generated by zero emission renewable sources. Non-residential projects are not currently subject to mandatory solar installations; however, the State’s goal is for nonresidential development to be net zero energy consumption by 2030.

7.2.c
Packet Pg. 617 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-58 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx As described above the proposed project would result in a long-term increase in demand for electricity from the Turlock Irrigation District and natural gas from PG&E. However, the project would be designed to meet the most recent Title 24 standards. Title 24 specifically establishes energy efficiency standards for residential and non-residential buildings constructed in the State of California in order to reduce energy demand and consumption. Title 24 is updated periodically to incorporate and consider new energy efficiency technologies and methodologies. Therefore, impacts from the wasteful or inefficient use of electricity or natural gas during operation of the project would be less than significant.

Water Treatment, Conveyance, and Distribution
Water used for indoor and outdoor purposes requires electricity for water treatment, conveyance, and distribution. The project’s water demand was calculated based on default values for the specific land uses proposed by the project using CalEEMod. Based on this methodology the proposed project is estimated to use approximately 1,650 million gallons of indoor water per year as well as 278 million gallons of outdoor water per year. This would result in the use of approximately 6,748,120 kWh of electricity per year.

Although the proposed project would result in electricity use from the treatment, conveyance, and distribution of water to the project site, the project would also require all water fixtures to be compliant with the 2013 California Green Building Standards Code and the MWELO, which would reduce the amount of water used by the project and require compliance with regulations relating to drought conditions. Therefore, the project would not result in the wasteful or inefficient use of electricity for water treatment, conveyance, and distribution and impacts would be less than significant.

Wastewater Service
The project would be served by the City of Patterson Wastewater Treatment Facility (WWTF). Project wastewater generation was estimated using CalEEMod default assumptions for indoor water use required by the project land uses. Project indoor water use of 1,650 Mgal per day would result in the use of 3,153,813 kWh of electricity per year. Compliance with the 2013 California Green Building Standards Code, would reduce the wastewater generated by the project. Energy used for treating project wastewater will increasingly be generated by renewable energy sources to comply with RPS standards that apply to the energy utility serving the project area.

The project site and the entire City of Patterson are nearly flat, but slope in the direction of the WWTF. The elevation at the project site is approximately 113 feet and the elevation at the WWTF is approximately 53 feet. This is expected to limit the need to pump wastewater to a great extent since gravity will do most of the work in moving the effluent. The WWTF would uses standard treatment equipment that would not result in wasteful energy use. Any new facilities that are needed to accommodate the project would be required to meet the latest standards and technologies.

Wastewater service would require an extension of sewer lines to the treatment plant. The energy added for the extension and use of these facilities combined with the project’s estimated electricity and natural gas consumption would not result in substantial new energy generation or transmission infrastructure due to the location and capacity of existing energy infrastructure near the project site.

7.2.c
Packet Pg. 618 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-59
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Additionally, the project would be constructed over 20 years allowing for gradual expansion of facilities. Therefore, the project would not result in the wasteful or inefficient use of electricity for wastewater treatment, and impacts would be less than significant.

Fuel Consumption
During operation of the proposed project vehicle trips would be generated by the project’s specific land uses. The project’s specific land uses were modeled in CalEEMod using ITE 10th Edition vehicle trip generation rates. As shown in Appendix C, the vehicle trips generated would result in approximately 233,894,978 VMT per year. Based on a countywide average fuel consumption of 21.1 mpg from Emission Factor (EMFAC) 2017 for all vehicle classifications for 2022, the proposed project would result in the consumption of an estimated 11,085,070 gallons per year of transportation fuel.

Various federal and state regulations including the Low Carbon Fuel Standard, Pavley Clean Car Standards, and Low Emission Vehicle Program would serve to reduce the project’s transportation fuel consumption progressively into the future. Therefore, the project would be designed to avoid the wasteful and inefficient use of transportation fuel during operations and impacts would be less than significant.

State and federal regulatory requirements addressing fuel efficiency are expected to increase fuel efficiency over time as older, less fuel-efficient vehicles are retired. The efficiency standards and light/heavy vehicle efficiency/hybridization programs, contribute to increased fuel efficiency and therefore would reduce vehicle fuel energy consumption rates over time. The annual vehicular energy consumption calculated for the proposed project was based on 2022 average rates for Stanislaus County. This is considered a conservative estimate because rates are expected to decline significantly by project buildout in 2040. While the project would increase the consumption of gasoline and diesel proportionately with projected population and employment growth, the increase would be accommodated within the projected growth as part of the energy projections for the state and the region and would not require the construction of new regional energy production facilities.

Therefore, energy impacts related to fuel consumption/efficiency during project operations would be less than significant.

As described above, the project would result in less than significant impacts on the wasteful, inefficient, or unnecessary use of energy due to project design features that will comply with the City’s design guidelines and regulations that apply to the project such as Title 24 Building Energy Efficiency Standards and the California Green Building Standards Code that apply to commercial and residential buildings. These regulations are expected to become increasingly stringent over time and would require the project to minimize the wasteful and inefficient use of energy. Furthermore, various federal and state regulations including the Low Carbon Fuel Standard, Pavley Clean Car Standards, and Low Emission Vehicle Program would serve to reduce the transportation fuel demand by Master Plan projects.

With the adherence to the increasingly stringent building and vehicle efficiency standards as well as implementation of the project’s design features that would reduce energy consumption, the proposed project would not contribute to a cumulative impact to the wasteful or inefficient use of energy. As such, the project would not result in a significant environmental impact due to wasteful,

7.2.c
Packet Pg. 619 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-60 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx inefficient, or unnecessary consumption of energy resources, during project construction or operation.

A summary of the project’s estimated energy consumption is provided in Table 3.7-10.

Table 3.7-10: Energy Consumption Summary
Activity Variable Consumption Rate Annual Consumption
Residential Electricity 5,481 dwelling units 5,053 kWh/unit/year 27,694,820 kWh/year
Residential Natural Gas 17,726 Kbtu/unit/year 97,157,680 kbtu/year
Non-Residential Electricity 7,765,000 square
feet

14.75 kWh/square foot/year 113,369,000 kWh
Non-Residential Natural Gas 12.84 cubic-feet/square
foot/year
289,634,500
kbtu/year
Water Supply, Treatment, and
Conveyance
Water Use (Mgal) 1928 Mgal/yr
3,500 kWh/Mgal
6,748,120
kWh/year
Wastewater Treatment Water Use (Mgal 1,650 Mgal/yr
1,911 kWh/Mgal
3,153,813
kWh/year
Construction Equipment Gallons of Fuel Used 0,05 gal/hp-hr (diesel) 534,755 gallons Construction VMT VMT/project VMT = 3,056,220

21.1 mpg
144,845 gallons
Transportation VMT/Year/Project VMT = 233,894,978

21.1 mpg
11,085,070 gallons
Notes:

Btu = British Thermal Units
kWh = Kilowatt Hours
Mgal = Million gallon
Mpg = miles per gallon
Source of data for construction and VMT: CalEEMod 2016.3.2 Stanislaus County MPG for All Vehicles in 2022 – EMFAC 2017.

Modeling results are provided in Appendix C.

Level of Significance Before Mitigation
Less than significant impact
Mitigation Measures
No mitigation is required
Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 620 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-61
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Renewable Energy
Impact GHG-4: Buildout of the Master Plan would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency.

Impact Analysis
Be Inconsistent with Adopted Plans and Policies
The City of Patterson Sustainability Plan (City of Patterson 2009), prepared in 2009, provides energy goals of and policies for the community. The Patterson Sustainability Plan sets forth specific actions to improve City’s overall sustainability now and in the future. It recommends specific changes to the City’s current operational and decision-making practices, as well as changes the private sector can make (voluntary or otherwise). The objective of the Plan is to preserve the unique character and quality of life in Patterson, minimize adverse environmental impacts, and promote efficient use of land, materials, energy, water, and other finite resources. The Sustainability Plan includes the following goals and policies:

1. Reduce energy use (e.g. electricity, gas) in buildings.

2. Integrate energy efficiency into standard operating procedures for government, residents, and commercial and industrial businesses.

3. Strive to meet all new demand through energy efficiency and renewable energy sources.

4. Increase the amount of on-site renewable energy projects in Patterson.

Goal EE-1: Incorporate sustainable building practices into the City’s development regulations.

Actions
EE-1.1: By 2010, adopt a mandatory Green Building Ordinance for new construction and renovation. a. Require Build It Green’s GreenPoint Rated certification for residential construction and a LEED Silver rating for healthcare facilities and commercial & industrial construction. b. Offer flexibility and options to the property owner in determining which materials and techniques meet their needs and desires for complying with the standards.

EE-1.2 Encourage passive solar design (passive heating and cooling) to avoid or minimize cooling needs through building orientation of all new development.

EE-1.3 Amend Municipal Code to allow more flexible development standards as incentives for development projects that exceed the minimum requirements for LEED or GreenPoint Rated, such as density bonuses, increased maximum building height, increased Floor Area Ratio (FAR), or a reduced on-site parking requirement.

EE-1.4 Develop financial incentives for new construction projects that are LEED-certified. The incentive rate should increase for each additional point earned.

EE-1.5 Preserve existing structures when feasible, and encourage adaptive reuse.

EE-1.6 Encourage commercial & industrial businesses to install cool roofs (painted white) or green roofs (with vegetation).

7.2.c
Packet Pg. 621 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Greenhouse Gas Emissions and Energy Draft EIR

3.7-62 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx EE-1.7 Encourage the replacement of inefficient appliances with efficient ones, when there is a change in ownership (or rental).

Goal EE-4: Promote the development of on-site renewable energy (e.g. solar, wind, biomass, and geothermal).

Actions
EE-4.1 Conduct a feasibility study to explore the possibility of installing a methane recovery system at the City’s Water Quality Control Facility (WQCF), or wastewater treatment plant, to generate electricity.

EE-4.2 Amend Municipal Code to streamline the approval of solar panels and small-scale wind turbines. Protect light access for solar energy systems.

EE-4.3 Offer a Solar Fee Waiver for any building permit application fees related to the installation of solar panels.

EE-4.4 Implement a Solar Roof Program under Property Assessed Clean Energy to minimize upfront costs for installing solar panels on residential and non-residential buildings. The landowner will pay an annual ‘special assessment’ property tax.

EE-4.5 Encourage installation and private funding of on-site renewable energy projects in Patterson, e.g. homes; roofs and parking lot solar photovoltaic arrays in the West Patterson Business Park and in commercial centers providing a large area for solar panels, and providing shade for vehicles.

EE-4.6 Collaborate with large landowners, including surrounding agricultural uses in Stanislaus County, to encourage installation and funding of on-site renewable energy projects.

EE-4.7 Encourage the Stanislaus County Environmental Resources Department to install a methane recovery system at the Fink Road Landfill to generate electricity.

Many of the goals and policies of the Sustainability Plan have been accomplished through State regulations described earlier. For example, solar panels are required by 2019 Title 24, RPS standards have resulted in large scale construction of renewable energy projects to meet the RPS renewables mandate. The CalGreen Building code requires solar ready roofs, light colored roofs for industrial buildings, and mandates recycling of construction materials among others.

Through incorporation of the measures described above, for example, the project will be designed to include energy conservation measures to meet or exceed the regulatory requirements, and would comply with the applicable policies of the Sustainability Plan. The project includes non-residential uses that would employ approximately 8,670 people, helping to improve the jobs/housing balance and to reduce the commute distances for area residents. The project will comply with the most recent energy building standards consistent with applicable plans and policies and would not result in wasteful or inefficient use of nonrenewable energy sources. Therefore, impacts would be less than significant.

Level of Significance Before Mitigation
Less than significant impact

7.2.c
Packet Pg. 622 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Greenhouse Gas Emissions and Energy
FirstCarbon Solutions 3.7-63
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-07 Greenhouse Gas.docx Mitigation Measures
No mitigation measures are required
Level of Significance After Mitigation
Less than significant impact

7.2.c
Packet Pg. 623 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project)

THIS PAGE INTENTIONALLY LEFT BLANK

7.2.c
Packet Pg. 624 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.8-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx

3.8 - Hazards and Hazardous Materials

3.8.1 - Introduction
This section describes the existing hazards and hazardous materials setting and potential effects from project implementation on the site and its surrounding area. Descriptions and analysis in this section are based, in part, on information contained within the City of Patterson General Plan, the General Plan EIR, the California State Water Resources Control Board’s GeoTracker Database, and information provided by the property owner.

3.8.2 - Environmental Setting
Hazardous Materials
Hazardous materials, as defined by the California Code of Regulations, are substances with certain physical properties that could pose a substantial present or future hazard to human health or the environment when improperly handled, disposed, or otherwise managed. Hazardous materials are grouped into the following four categories, based on their properties:

Toxic—causes human health effects
Ignitable—has the ability to burn
Corrosive—causes severe burns or damage to materials
Reactive—causes explosions or generates toxic gases
A hazardous waste is any hazardous material that is discarded, abandoned, or slated to be recycled.

The criteria that define a material as hazardous also define a waste as hazardous. If improperly handled, hazardous materials and hazardous waste can result in public health hazards if released into the soil or groundwater or through airborne releases in vapors, fumes, or dust. Soil and groundwater having concentrations of hazardous constituents higher than specific regulatory levels must be handled and disposed of as hazardous waste when excavated or pumped from an aquifer.

The California Code of Regulations, Title 22, Sections 66261.20-24 contains technical descriptions of toxic characteristics that could cause soil or groundwater to be classified as hazardous waste.

Database Search
Table 3.8-1 summarizes all of the recorded hazardous material sites within 0.5 mile of the project site based on a GeoTracker1search conducted in 2019. As shown in the table, three sites are listed.

Table 3.8-1: Database Search Summary
Name Address
Distance From Nearest
Master Plan Area Database Summary
PRC
Patterson
13331
Highway 33
1,750 feet Clean Up
Program
Active; Abandoned petroleum recycling
facility. Remediation underway.

Patterson 500 N. 2nd 2,500 feet LUST Closed (2004); Leaking underground 1 GeoTracker includes sites listed on the Cortese List. Refer to Regulatory Framework section for discussion of the Cortese List.

7.2.c
Packet Pg. 625 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hazards and Hazardous Materials Draft EIR

3.8-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx Name Address
Distance From Nearest
Master Plan Area Database Summary
Beacon Street storage tank. Remediation completed.

CAL FIRE 2142 Sperry
Avenue
2,100 feet LUST Closed (1996); Leaking underground
storage tank. Remediation completed.

Notes:

Source: State Water Resources Control Board, 2019.

Of the three sites, two (Patterson Beacon and CAL FIRE) are listed as ‘Case Closed’ signifying that they have been remediated to the satisfaction of the regulatory agency with jurisdiction. The third site (PRC Patterson) is listed as active.

PRC Patterson
PRC Patterson previously supported a petroleum recycling operation 1,750 feet downgradient from the Master plan areas that was abandoned in 1996. Following abandonment, a number of above ground storage tanks, underground storage tanks, and basins were removed, and soil and groundwater testing was performed. The most recent action was in 2010. Given the distance of the Master Plan from this operation and the gradient, to the extent that any soil or groundwater contamination that may be present at this site, it would not pose a risk to the Zacharias Master Plan area.

Radon
Radon is a carcinogenic, radioactive gas resulting from the natural breakdown of uranium in soil, rock, and water. Radon gas enters a building through cracks in foundations and walls. Once inside the building, radon decay products may become attached to dust particles and inhaled, or the decayed radioactive particles alone may be inhaled and cause damage to lung tissue. The United States Environmental Protection Agency (EPA) has established a safe radon exposure threshold of 4 picocuries per liter of air (pCi/l).

The California Department of Health Services has conducted more than 48,000 indoor radon tests in more than 1,700 zip codes through the State, including the one zip code that represents the City of Patterson. According to the test results from the sample taken in the City of Patterson, radon levels within the area did not exceed 4.0 pCi/l. Furthermore, Stanislaus County is identified by the United States Environmental Protection Agency as Radon Zone 3, which represents areas with low potential for radon levels exceeding 2.0 pCi/L. Therefore, radon is not considered an issue of concern in the Patterson area.

Low-Frequency Electromagnetic Fields
Electrical transmission and distribution lines emit extremely low-frequency electromagnetic fields (EMFs), which have been suspected to be linked to cancer. However, scientific research has never conclusively established a link between EMFs and cancer. In 2007, the World Health Organization issued a report titled “Extremely Low Frequency Fields, Environmental Health Criteria Monograph No. 238” that concluded that evidence between extremely low-frequency EMFs and childhood leukemia is not strong enough to be considered causal, although it did note that the issue still was of

7.2.c
Packet Pg. 626 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.8-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx concern. The same report indicated that there is inadequate evidence or no evidence linking lowfrequency EMFs and health effects associated with all other diseases.

According to the California Energy Commission, no major electrical transmission lines are located within either the Baldwin or the Zacharias Master Plan Areas. The nearest high voltage electrical facility to the Zacharias Master Plan is the Turlock Irrigation District substation on Rogers Road, a distance of 0.25-mile. The nearest high voltage electrical transmission line to the Baldwin Master Plan Area is a 220 kilovolt tower line located on the west side of Interstate 5, a distance of 1.68 miles.

3.8.3 - Regulatory Framework
Federal
Federal Toxic Substances Control Act and Resource Conservation and Recovery Act The Federal Toxic Substances Control Act of 1976 and the Resource Conservation and Recovery Act of 1976 (RCRA) regulate the generation, transportation, treatment, storage, and disposal of hazardous and non-hazardous waste. The regulatory program is administered by the EPA. It mandates that hazardous wastes be tracked from the point of generation to their ultimate fate in the environment. This includes detailed tracking of hazardous materials during transport and permitting of hazardous material handling facilities. RCRA was amended in 1984 by the Hazardous and Solid Waste Act (HSWA), which affirmed and extended the “cradle to grave” system of regulating hazardous wastes. The HSWA also prohibited the use of certain techniques for the disposal of some hazardous wastes, and provided the framework for a regulatory program designed to prevent releases from USTs. The program establishes tank and leak detection standards, including spill and overflow protection devices for new tanks, and performance standards to ensure that the stored material will not corrode the tanks.

Comprehensive Environmental Response, Compensation, and Liability Act The Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) introduced active federal involvement to emergency response, site remediation, and spill prevention, most notably the Superfund program. The Act was intended to be comprehensive in encompassing both the prevention of, and response to, uncontrolled hazardous substances releases.

The Act deals with environmental response, providing mechanisms for reacting to emergencies and to chronic hazardous material releases. In addition to establishing procedures to prevent and remedy problems, it establishes a system for compensating appropriate individuals and assigning appropriate liability. It is designed to plan for and respond to failure in other regulatory programs and to remedy problems resulting from action taken before the era of comprehensive regulatory protection.

Transportation of Hazardous Materials
The Hazardous Materials Transportation Act of 1974, as amended, is the basic statute regulating hazardous materials transportation in the United States. Transportation of hazardous materials is regulated by the U.S. Department of Transportation’s Office of Hazardous Materials Safety. The Office of Hazardous Materials Safety formulates, issues, and revises hazardous materials regulations

7.2.c
Packet Pg. 627 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hazards and Hazardous Materials Draft EIR

3.8-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx under the Federal Hazardous Materials Transportation Law. The hazardous materials regulations cover hazardous materials definitions and classifications, hazard communications, shipper and carrier operations, training and security requirements, and packaging and container specifications.

The hazardous materials transportation regulations are codified in 49 Code of Federal Regulations Parts 100-185.

The hazardous materials transportation regulations require carriers transporting hazardous materials to receive training in the handling and transportation of hazardous materials. Training requirements include pre-trip safety inspections, use of vehicle controls and equipment including emergency equipment, procedures for safe operation of the transport vehicle, training on the properties of the hazardous material being transported, and loading and unloading procedures. All drivers must possess a commercial driver’s license as required by 49 Code of Federal Regulations Part 383.

Vehicles transporting hazardous materials must be properly placarded. In addition, the carrier is responsible for the safe unloading of hazardous materials at the site, and operators must follow specific procedures during unloading to minimize the potential for an accidental release of hazardous materials.

State
Cortese List
The provisions in Government Code Section 65962.5 are commonly referred to as the “Cortese List.” The list, or a site’s presence on the list, has bearing on the local permitting process as well as on compliance with the California Environmental Quality Act (CEQA). While Government Code Section 65962.5 makes reference to the preparation of a ‘list,’ many changes have occurred related to webbased information access since 1992 and this information is now largely available on the websites of GeoTracker and EnviroStor. Those requesting a copy of the Cortese “list” are now referred directly to the appropriate information resources contained on the Internet web sites (e.g., GeoTracker and EnviroStor).

Handling and Storage of Hazardous Waste
The handling and storage of hazardous materials is regulated on the federal level by the EPA under the CERCLA as amended by the Superfund Amendments and Reauthorization Act (SARA). Under SARA Title III, a nationwide emergency planning and response program was established that imposed reporting requirements for businesses that store, handle, or produce significant quantities of hazardous or acutely toxic substances as defined under federal laws. SARA Title III required each state to implement a comprehensive system to inform federal authorities, local agencies, and the public when a significant quantity of hazardous, acutely toxic substances are stored or handled at a facility.

In California, the handling and storage of hazardous materials is regulated by Chapter 6.95 of the California Health and Safety Code. Under Sections 25500-25543.3, facilities handling hazardous materials are required to prepare a Hazardous Materials Business Plan. The business plan provides information to the local emergency response agency regarding the types and quantities of hazardous materials stored at a facility and provides detailed emergency planning and response procedures in the event of a hazardous materials release. In the event that a facility stores quantities of specific

7.2.c
Packet Pg. 628 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.8-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx acutely hazardous materials above the thresholds set forth by the California code, facilities are required to prepare a Risk Management Plan and California Accidental Release Plan, which provide information on the potential impact zone of a worst-case release, and requires plans and programs designed to minimize the probability of a release and mitigate potential impacts.

California Hazardous Waste Control Law
The California Hazardous Waste Control Law (HWCL) is administered by the California Environmental Protection Agency to regulate hazardous wastes. While the HWCL is generally more stringent than RCRA, until the EPA approves the California program, both the state and federal laws apply in California. The HWCL lists 791 chemicals and approximately 300 common materials that may be hazardous; establishes criteria for identifying, packaging, and labeling hazardous wastes; prescribes management controls; establishes permit requirements for treatment, storage, disposal, and transportation; and identifies some wastes that cannot be disposed of in landfills.

The California Code of Regulations, Title 22, Chapter 11, Article 2, Section 66261.10 defines hazardous waste as a substance that may:
(1) Cause, or significantly contribute to, an increase in mortality or an increase in serious irreversible or incapacitating reversible, illness; or (2) pose a substantial present or potential hazard to human health or environment when improperly treated, stored, transported, or disposed or otherwise managed.

According to California Code of Regulations Title 22, substances having a characteristic of toxicity, ignitability, corrosivity, or reactivity are considered hazardous waste. Hazardous wastes are hazardous substances that no longer have a practical use, such as material that has been abandoned, discarded, spilled, or contaminated or is being stored prior to proper disposal.

Toxic substances may cause short-term or long-lasting health effects, ranging from temporary effects to permanent disability or death. For example, toxic substances can cause eye or skin irritation, disorientation, headache, nausea, allergic reactions, acute poisoning, chronic illness, or other adverse health effects if human exposure exceeds certain levels (the level depends on the substance involved). Carcinogens (substances known to cause cancer) are a special class of toxic substances.

Examples of toxic substances include most heavy metals, pesticides, and benzene (a carcinogenic component of gasoline). Ignitable substances are hazardous because of their flammable properties.

Gasoline, hexane, and natural gas are examples of ignitable substances. Corrosive substances are chemically active and can damage other materials or cause severe bums upon contact. Examples include strong acids and bases such as sulfuric (battery) acid or lye. Reactive substances may cause explosions or generate gases or fumes. Explosives, pressurized canisters, and pure sodium metal (which reacts violently with water) are examples of reactive materials.

Other types of hazardous materials include radioactive and biohazardous materials. Radioactive materials and wastes contain radioisotopes, which are atoms with unstable nuclei that emit ionizing radiation to increase their stability. Radioactive waste mixed with chemical hazardous waste is referred to as “mixed wastes.” Biohazardous materials and wastes include anything derived from living organisms. They may be contaminated with disease-causing agents, such as bacteria or viruses.

7.2.c
Packet Pg. 629 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hazards and Hazardous Materials Draft EIR

3.8-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx The Hazardous Materials Release Response Plans and Inventory Law of 1985 (Business Plan Act) requires that any business that handles hazardous materials prepare a business plan that must include details, including floor plans, of the facility and business conducted at the site, an inventory of hazardous materials that are handled or stored on the site, an emergency response plan, a training program in safety procedures and emergency response for new employees, and an annual refresher course in the same topics for all employees.

The Porter-Cologne Water Quality Act (California Water Code, Section 13000, et seq.) established the authority of the State Water Resources Control Board (State Water Board) and provided the Regional Water Quality Control Board (RWQCB) with the primary responsibility of the protection of water quality in the State of California.

Hazardous Materials Worker Safety
The California Occupational Safety and Health Administration (Cal-OSHA) and the Federal Occupational Safety and Health Administration (OSHA) are the agencies responsible for assuring worker safety by developing and enforcing workplace safety regulations in the handling and use of chemicals in the workplace. Cal-OSHA standards are generally more stringent than federal regulations. The employer is required to monitor worker exposure to listed hazardous substances and notify workers of exposure (8 CCR §§ 337-340, Chapter 3.2). The regulations specify requirements for employee training, availability of safety equipment, accident prevention programs, and hazardous substance exposure warnings.

California Fire Code
California Code of Regulations, Title 24, also known as the California Building Standards Code, contains the California Fire Code (CFC) at Part 9. The CFC includes provisions and standards for emergency planning and preparedness, fire service features, fire protection systems, hazardous materials, fire flow requirements, and fire hydrant locations and distribution.

California Department of Transportation (Caltrans) and California Highway Patrol The California Vehicle Code Section 31303 requires that hazardous materials be transported via routes with the least overall travel time, and prohibits the transportation of hazardous materials through residential neighborhoods. In California, the California Highway Patrol (CHP) is authorized to designate and enforce route restrictions for the transportation of hazardous materials. To operate in California, all hazardous waste transporters must be registered with the DTSC. Unless specifically exempted, hazardous waste transporters must comply with the California Highway Patrol Regulations, the California State Fire Marshal Regulations, and the United States Department of Transportation Regulations. In addition, hazardous waste transporters must comply with Division 20, Chapter 6.5, Article 6 and 13 of the California Health and Safety Code, and the Title 22, Division 4.5, Chapter 13 of the California Code of Regulations, both of which are administered by the DTSC.

Central Valley Regional Water Quality Control Board
There are nine Regional Water Quality Control Boards (RWQCBs) throughout the State. The Central Valley RWQCB has jurisdiction over the City of Patterson. Individual RWQCBs function as the lead

7.2.c
Packet Pg. 630 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.8-7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx agencies responsible for identifying, monitoring, and cleaning up LUSTs. Storage of hazardous materials in USTs is regulated by the State Water Board, which oversees the nine RWQCBs.

Local
The City of Patterson General Plan, Health and Safety Element identifies potential natural and human-made hazards to Patterson residents, including seismic events, flooding, fires, and the unhealthful effects of noise, and provides policies, programs and standards to protect people from such hazards. Goals and policies with relation to hazards and hazardous materials include the following:

Goals:

HS-4: To ensure that City emergency response procedures are adequate in the event of natural or human-made disasters.

HS-7: To protect the health and safety of Patterson residents from the harmful effects of the use, transport and disposal of hazardous substances.

Policies
HS-4.1: Emergency Response Plan. The City shall maintain, periodically update, and test the effectiveness of its Emergency Response Plan. As part of the periodic update, the City shall review county and state emergency response plans and procedures to ensure coordination with the City’s plan.

HS-4.2: Emergency Access Routes. The City shall identify emergency access routes and shall ensure that they are kept free of traffic impediments. Emergency access and evacuation routes shall be maintained for areas east and west of the railroad right-of-way.

HS-4.3: Water sources for firefighting. The City shall identify alternative water sources for firefighting purposes for use during a disaster.

HS-4.4: Siting of emergency facilities. Critical emergency response facilities such as hospitals, fire, police, emergency service facilities, and utilities shall be sited to minimize their exposure to flooding, seismic effects, fire, or explosion, and to ensure the protection of areas on either side of the railroad right-of-way.

HS-4.5: Command center for emergencies. The City shall designate and develop a command center for use during times of emergency.

HS-4.6: Mutual aid. The city shall maintain mutual aid agreements and communications links with surrounding jurisdictions for assistance during times of emergency.

HS-4.7: Secondary access over San Joaquin River. The City shall work with the Stanislaus Council of Governments (StanCOG) and other applicable agencies to establish a secondary emergency access across the San Joaquin River.

7.2.c
Packet Pg. 631 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hazards and Hazardous Materials Draft EIR

3.8-8 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx HS-7.1: Coordination. The City shall coordinate with the California Highway Patrol, the Stanislaus County Department of Environmental Health Services, the County Sheriff’s Department, and all other appropriate local, state and federal agencies in hazardous materials route planning, notifications and incident response, to ensure appropriate first response to hazardous material incidents.

HS-7.2 Avoidance. The City shall seek to avoid and minimize exposure of sensitive land uses to potentially hazardous emissions along truck routes and rail lines which may be used by surface vehicles and rail cars carrying hazardous or toxic substances. These truck routes include Interstate 5, State Highway 33, and Las Palmas Avenue. Rail corridors include the two primary lines running north-south through Patterson.

HS-7.3 Management of hazardous materials. The City shall regulate the storage of hazardous and waste materials consistent with state and federal law. The City shall not permit above ground tanks without considering the potential hazards that would result from the release of stored liquids caused by possible rupture or collapse and may request applicants to have an emergency response plan.

HS-7.4 Industrial facilities. The City shall work with responsible agencies to ensure that all industrial facilities are constructed and operated in accordance with the most current safety and environmental protection standards.

HS-7.5 Storage. Industries that store and process significant quantities of hazardous or toxic materials shall provide a buffer zone between the installation that houses such substances and the property boundaries of the facility sufficient to protect the public in the event of the release or leak of the materials.

HS-7.6 Remediation. The City shall work with other responsible agencies on efforts to clean up or contain identified soil or water contamination in the city limits.

HS-7.7 Written confirmation of remediation. The City shall require written confirmation from applicable local, regional, state, and federal agencies that known contaminated sites have been deemed remediated to a level appropriate for land uses proposed prior to the City approving site development or provide an approved remediation plan that demonstrates how contamination will be remediated prior to site occupancy. This documentation shall specify the extent of development allowed on the remediated site as well as any special conditions and/or restrictions on future land uses.

3.8.4 - Methodology
FirstCarbon Solutions evaluated potential impacts on hazards and hazardous materials through review of the General Plan, the General Plan EIR, the California State Water Resources Control Board’s GeoTracker database, and information provided by the property owners.

7.2.c
Packet Pg. 632 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.8-9
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx

3.8.5 - Thresholds of Significance
According to Appendix G, Environmental Checklist, of the CEQA Guidelines, hazards and hazardous materials impacts resulting from the implementation of the proposed project would be considered significant if the project would:
a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the likely release of hazardous materials into the environment?
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working the project area? (Refer to Section 7, Effects Found Not To Be Significant)
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
g) Expose people or structures to a significant risk of loss, injury, or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (Refer to Section 7, Effects Found Not To Be Significant)

3.8.6 - Project Impacts and Mitigation Measures
This section discusses potential impacts associated with the development of the project and provides mitigation measures where appropriate.

Routine Transport, Use, or Disposal of Hazardous Materials / Risk of Upset Impact HAZ-1: Buildout of the Master Plans would not create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials and would not create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the likely release of hazardous materials into the environment.

Impact Analysis
The proposed Master Plans contemplate the development of up to 5,086 dwelling units, 7.765 million square feet of non-residential uses, two schools, parks, a trail network, and flood control basin.

7.2.c
Packet Pg. 633 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hazards and Hazardous Materials Draft EIR

3.8-10 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx Zacharias and Baldwin Master Plans
Construction
The two Master Plan Areas are currently developed with agricultural land. Small quantities of potentially hazardous materials and substances would be expected to be present during construction. However, based on the duration of construction, the presence of regulatory oversight, and the overall nature of construction, the use of significant quantities of hazardous materials is not expected and would not represent a significant environmental or public hazard.

Operation
The Master Plan’s residential, mixed use, school, and park uses would not involve the use of large quantities of hazardous materials. The Zacharias Master Plan’s industrial uses would be expected to be similar to those that currently existing in the West Patterson Business Park, which are mostly distribution and logistics. These facilities receive and ship merchandise; they do not engage in manufacturing or processing; thus, they are not large quantity users of hazardous materials. To the extent that an industrial use that involves the routine use of large quantities of hazardous materials were to locate within the Zacharias Master Plan, it would be subject to state and local requirements including, but not limited to, secondary containment, regular inspection, and worker training.

Impacts would be less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact.

Exposure of Schools to Hazardous Materials
Impact HAZ-2: Buildout of the Master Plans would not emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within onequarter mile of an existing or proposed school.

Impact Analysis
The proposed Master Plans contemplate the development of up to 5,086 dwelling units, 7.765 million square feet of non-residential uses, two schools, parks, a trail network, and flood control basin.

Baldwin Master Plan Area
There are no existing or planned schools within the Baldwin Master Plan area or within 0.25 mile of the plan area. This condition precludes the possibility of impacts in this regard.

7.2.c
Packet Pg. 634 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.8-11
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx Zacharias Master Plan Area
The proposed project includes the development of an elementary and middle school within the Zacharias Master Plan Area. Additionally, Patterson Unified School District has acquired land to develop a high school at the northwest quadrant of the Baldwin Road / Zacharias Road intersection just outside the Master Plan boundaries.

The middle school would be developed on the west side of Baldwin Road and may be within 0.25 mile of the planned industrial uses along Rogers Road or the existing Keystone Pacific Business Park to the south. Distribution centers are the closest uses within the Keystone Pacific Business Park that may be within 0.25 mile of the school. These facilities receive and ship merchandise; they do not engage in manufacturing or processing; thus, they are not large quantity users of hazardous materials. As such, the middle school would not be exposed to hazardous materials.

The elementary school would be developed on the east side of Baldwin Road and may be within 0.25 mile of the planned mixed uses. The closest types of mixed commercial uses would be restaurants, small retail, and services, which would not be large quantity users of hazardous materials. As such, the elementary school would not be exposed to hazardous materials.

The Master Plan does not propose any land uses within 0.25-mile of the high school site that would handle large quantities of hazardous materials or emit substantial hazardous air emissions.

Therefore, impacts associated with the potential exposure of schools to hazardous materials would are less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact.

Government Code Section 65962.5 Sites
Impact HAZ-3: Buildout of the Master Plans would not be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would not create a significant hazard to the public or the environment.

Impact Analysis
The proposed Master Plans contemplate the development of up to 5,086 dwelling units, 7.765 million square feet of non-residential uses, two schools, parks, a trail network, and flood control basin.

7.2.c
Packet Pg. 635 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hazards and Hazardous Materials Draft EIR

3.8-12 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx Zacharias and Baldwin Master Plans
Cortese List
Neither the Zacharias nor Baldwin Master Plan areas are listed on the Cortese List, which includes various hazardous materials databases compiled to Government Code 65962.5.

In terms of surrounding sites, PRC Patterson is listed on the Cortese List. The site is 1,750 feet from the Zacharias Master Plan area and is down gradient. As such, to the extent that any soil or groundwater contamination that may be present at this site, it would not pose a risk to either of the Master Plan areas.

Agricultural Chemicals
The majority of the Master Plan areas have been in cultivated agricultural production for decades.

Such activities typically involve application of agricultural chemicals including herbicides and pesticides. Following application, residual concentrations of these chemicals will remain in upper soil layers. Accordingly, Mitigation Measure (MM) HAZ-3a requires the applicant to conduct soil testing for agricultural chemicals and, if detected above acceptable levels, to remediate the property in accordance with best management practices.

Hazardous Building Materials
Both Master Plan areas contain structures that appear to predate the Federal bans on asbestos and lead based paint. Additionally, these structures may contain mercury and polychlorinated biphenyls.

As such, the demolition of these structures may expose human health or the environment to hazardous building materials. Accordingly, MM HAZ-3b requires the project applicant to retain a certified hazardous waste contractor to properly remove and dispose of all materials containing asbestos, lead, mercury, and polychlorinated biphenyls prior to demolition.

Electromagnetic Fields
The nearest high voltage electrical facility to the Zacharias Master Plan is the Turlock Irrigation District substation on Rogers Road, a distance of 0.25-mile. The nearest high voltage electrical transmission line to the Baldwin Master Plan Area is a 220 kilovolt tower line located on the west side of Interstate 5, a distance of 1.68 miles. Of these facilities, the Rogers Road facility is of greatest concern; the tower line is too far from the Baldwin Master Plan area to expose to low-frequency EMFs.

Power lines (and by extension substations) emit low-frequency EMFs that range from 1 to 80 milligauss directly under or next to them. This EMF range is similar to that of clothes washers, electric ranges, compact fluorescent light bulbs, and a liquid crystal display/plasma television.

Because the Rogers Road substation is 0.25-mile away from the Zacharias Master Plan area, the exposure level would be even less. Thus, impacts would be less than significant.

Level of Significance Before Mitigation
Potentially significant impact.

7.2.c
Packet Pg. 636 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hazards and Hazardous Materials
FirstCarbon Solutions 3.8-13
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx Mitigation Measures
MM HAZ-3a Prior to issuance of grading permits for any portion of the project site where pesticides or other agricultural chemicals have been applied within the past 5 years, the project applicant shall retain a qualified consultant to perform soil testing for residual concentrations of agricultural chemicals. Soils shall be laboratory tested in accordance with California Department of Toxic Substances Control (DTSC) Guidelines. If the testing finds concentrations in excess of acceptable limits, the project applicant shall retain a qualified contractor to conduct remediation activities, which may include treatment or removal. The soil remediation activities shall be completed prior to grading.

MM HAZ-3b Prior to issuance of demolition permits for any structures, the project applicant shall retain a certified hazardous waste contractor to properly remove and dispose of all materials containing asbestos, lead, mercury, and polychlorinated biphenyls. Upon completion, the applicant shall submit documentation to the City of Patterson verifying such activities have been completed.

Level of Significance After Mitigation
Less than significant impact with mitigation incorporated.

Emergency Response and Evacuation
Impact HAZ-4: Buildout of the Master Plans would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan.

Impact Analysis
The proposed Master Plans contemplate the development of up to 5,086 dwelling units, 7.765 million square feet of non-residential uses, two schools, parks, a trail network, and flood control basin.

Baldwin Master Plan Area
The Baldwin Master Plan contemplates a looped internal circulation network that would connect to existing segments of the City of Paterson’s roadway network at Baldwin Road and the City of Patterson Corporation Yard access road. Thus, two points of connection would be provided.

Moreover, the Master Plan incorporates the General Plan Circulation Element’s roadway sections and, thus, the internal roadways would meet City standards for access and circulation. As such, adequate emergency response and evacuation would be provided.

Zacharias Master Plan Area
The Zacharias Master Plan contemplates an internal circulation network with multiple connections to the City of Paterson’s roadway network at Rogers Road, Zacharias Road, Baldwin Road, and Ward Avenue. The Zacharias Master Plan also contemplates an East-West Connector that would link the Master Plan area to State Route 33. Additionally, two Emergency Vehicle Access (EVA) points would be provided at the existing Ivy Avenue and Rose Avenue cul-de-sacs. Moreover, the Master Plan

7.2.c
Packet Pg. 637 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hazards and Hazardous Materials Draft EIR

3.8-14 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-08 Hazards.docx incorporates the General Plan Circulation Element’s roadway sections and, thus, the internal roadways would meet City standards for access and circulation. As such, adequate emergency response and evacuation would be provided.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 638 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx

3.9 - Hydrology and Water Quality

3.9.1 - Introduction
This section describes the existing hydrology and water quality setting, and potential effects from the Zacharias and Baldwin Master Plan Projects (project) implementation on the project site and its surrounding area. Individual planning areas are highlighted where needed, otherwise the discussions in this chapter pertain to both the Zacharias and Baldwin planning areas. Balance Hydrologics assessed the potential for flooding in the Zacharias Master Plan area. An accompanying Technical Memo is provided in Appendix H. Additional information was provided by the City of Patterson, Federal Emergency Management Agency, the Central Valley Regional Water Quality Control Board, California Department of Water Resources, and National Oceanic and Atmospheric Administration.

3.9.2 - Environmental Setting
Regional climate can be characterized as a semi-arid Mediterranean climate, with cooler winters and hotter summers typical of the transition zone from the coastal mountains to the San Joaquin Valley.

Monthly temperatures in the winter range from lows of mid-30° F to highs of low-60° F, and in the summer range from lows of mid-50° F to highs of mid-90° F. The project site receives approximately

11.5 inches of rain per year (Table 3.9-1). Modest rainfall totals can be attributed to the general climate as well as to a rain shadow effect of the California Coast Diablo Range to the west.

Average monthly precipitation, temperature, and reference evapotranspiration (ETo) for the period are shown in Table 3.9-1. Precipitation exceeds ETo only in the winter month of January and the two are approximately in equilibrium in December and February. ETo exceeds precipitation on a yearly basis at a 5:1 ratio, with the largest deficits in summer months with high temperatures and incidental amounts of rain.

Table 3.9-1: Average Monthly Precipitation, Temperature and Reference ETo Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual
Precipitation (in) 2.55 2.18 2.00 0.63 0.39 0.04 0.02 0.02 0.27 0.61 1.23 1.51 11.45 Temperature (F°) 45.6 50.9 54.8 59.8 66.8 73.2 77.1 75.8 72.3 64.5 53.0 45.3 61.6 Max Temp (F°) 54.2 61.8 67.0 74.5 82.7 90.5 94.6 92.6 88.6 79.8 65.1 55.1 75.5 Min Temp (F°) 37.0 40.0 42.6 45.1 50.8 55.9 59.6 58.9 55.9 49.2 40.9 35.5 47.6 ETo (in) 1.55 2.24 3.72 5.10 6.82 7.80 8.68 7.75 5.70 4.03 2.10 1.55 57.04 Notes:

Precipitation and temperature period of record was 1971-2010, ETo map was created in 1999.

Sources: Western Regional Climate Center, 2019; California Department of Water Resources, 1999.

Master Plan Area
The Baldwin and Zacharias and Baldwin Master Plan areas are predominately used for agricultural production and contain no stormwater drainage infrastructure. Rural residential land is located in the eastern portion of the Zacharias planning area. No formal storm drainage facilities are located

7.2.c
Packet Pg. 639 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx within the project areas (e.g., storm drain inlets, buried piping). Under existing conditions, runoff either ponds on-site and infiltrates into the local aquifer or flows into ditches or swales that convey to city streets that drain to Salado Creek. The Zacharias project area slopes gently away from Del Puerto Creek and is over one-half mile from the creek, thus runoff flows away from the creek rather than toward it. Storm drainage facilities are expected to be built out as development of these areas moves forward per the City of Patterson Draft Water Master Plan (WMP).

Surface Hydrology
The Patterson area features a network of natural streams and rivers, whereas predominately manmade surface water elements include canals and ditches that are used for water supplies and agricultural irrigation. The following is a description of the principal surface water bodies local to the Patterson area.

San Joaquin River
Patterson is located within the San Joaquin River watershed. The San Joaquin River is the secondlongest river in California, extending 300 miles from the Sierra Nevada Mountains to the San Joaquin Delta. The river and its tributaries drain a watershed encompassing approximately 32,000 square miles. In the Patterson area, the river is located approximately 2 miles east of the City and drains from south to north.

Del Puerto Creek
Del Puerto Creek is the principal natural waterway on the north side of the City of Patterson with a contributing watershed area of 72.6 square miles. The waterway is an intermittent stream with natural flows during the rainy season. Water flowing through the creek channel in the dry season comes from irrigation runoff (agricultural) or potentially seepage from irrigation ditches and/or aqueducts. The creek originates in Del Puerto Canyon in the Diablo Range west of Patterson, enters the area from the west through culverts under Interstate 5, the California Aqueduct, and the DeltaMendota Canal, and then meanders northeastward before discharging into the San Joaquin River approximately 4.75 miles north of the City limits. Although there is no official watershed delineation of Del Puerto Creek on the alluvial plain east of Interstate 5 other than along the channel itself (Exhibit 3.9-1), Federal Emergency Management Agency (FEMA) flood mapping indicates that overbank flood flows have the potential to move water into and through the project area (see “Flood Hazard Mapping” section for further information). The Zacharias planning area overlaps with the FEMA flood zone described above as the alluvial plain slopes southeastward, away from Del Puerto Creek. The City of Patterson General Plan indicates that Del Puerto Creek and its associated overbank alluvial plain are subject to flooding during major storm events.

Salado Creek
Salado Creek is the principal natural waterway that runs through the urbanized portions of the City of Patterson with a contribution watershed area of 25.3 square miles. The creek is an intermittent stream originating in the Diablo Range west of Patterson with natural flows during the rainy season.

Water flowing through the creek channel in the dry season comes from irrigation runoff (agricultural or urban) or potentially seepage from irrigation ditches and/or aqueducts. The creek is channelized before it enters Patterson from the south, remains channelized through the City, and ultimately

7.2.c
Packet Pg. 640 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx discharges into the San Joaquin River to the east. Urban discharge primarily originating from irrigation of lawns and parks can be found in the channel running through the City throughout the year. In the late 1990s, flood control improvements were made to Salado Creek, including enlarging the channel within the city limits and installing a 96-inch-diameter pipeline under Olive Avenue that runs from the railroad tracks at State Route 33 to the San Joaquin River. The Baldwin planning area is within the Salado Creek watershed, located about 2,000 feet west of the creek channel as it approaches the City boundary. The channelized creek within the City is piped along the boundary of the Zacharias planning area from east of Cliff Shallow Drive to Ward Avenue.

Delta Mendota Canal
The Delta-Mendota Canal is a 117-mile-long channel that is part of the Central Valley Water Project, a joint federal and state water project that spans the length of the San Joaquin Valley and provides water for agricultural, urban, and wildlife use. The canal conveys water from the Tracy Pumping Plant near Tracy to the Mendota Pool in Fresno County. In the Patterson area, the canal meanders through the west side of the City, approximately parallel to the east side of Interstate 5. No portion of this project is intersected by the Delta-Mendota Canal.

California Aqueduct
The California Aqueduct is a 444-mile-long conveyance channel that is part of the State Water Project, a state-built and -operated water storage and delivery system that provides water to 29 urban and agricultural water suppliers throughout California. The aqueduct conveys water from the Banks Pumping Plant near Tracy to a point south of the Tehachapi Mountains. In the Patterson area, the aqueduct runs between the east side of Interstate 5 and the Delta-Mendota Canal. No portion of this project is intersected by the California Aqueduct.

Irrigation Ditches
Irrigation ditches have been built throughout the alluvial plain east of the Diablo Range foothills. This area is prime agricultural land that depends on the regular delivery of water to fields, including existing agricultural fields in the project area. The ditches run parallel to the San Joaquin River and the gentle slope of the alluvial plain and generally perpendicular to the creeks. The Patterson Irrigation District was formed in 1955 to manage water delivery to agricultural lands (Paterson Irrigation District Water Management Plan 2016) in the Patterson area. Water allocations in 2010, the most recent year with data, came from Federal agricultural water via the Delta-Mendota Canal (approximately 6%), from local San Joaquin River surface water (approximately 82 percent), and from District groundwater (approximately 12 percent).

Surface Water Quality
Del Puerto Creek, Salsado Creek, and the San Joaquin River are listed on the U.S. Environmental Protection Agency (EPA) 303(d) list of impaired water bodies and associated pollutants, as administered by the Central Valley Regional Water Quality Control Board (RWQCB). Listings in the current 303(d) (Central Valley RWQCB 2016) are defined as those water bodies that do not meet, or are not expected to meet, water quality standards for a specified pollutant. For water bodies identified as impaired, the State is required to develop a Total Maximum Daily Load (TMDL) to account for all sources of pollutants from both point and nonpoint sources that are attributed to its

7.2.c
Packet Pg. 641 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx listing and which defines concentration limitations on discharge of a pollutant or stressor into the waterway over a defined time period.

Table 3.9-2 lists all 303(d) pollutants that require a TMDL in local water bodies. A TMDL for chlorpyrifos was in effect as of 2006 for the San Joaquin River. All other pollutants listed below require, but do not yet have, an approved TMDL.

Table 3.9-2: Impaired Water Bodies and Pollutants
Water Body Pollutant Category 303(d) List Pollutant TMDL expected date Del Puerto Creek Fecal Indicator Bacteria Fecal bacteria Unknown Pesticides Dieldrin, Bifenthrin,
Cyfluthrin, Cyhalothrin
Lamda, Esfenvalerate,
Fenvalerate, Pyrethroids
Unknown
Nutrients Nitrate/Nitrite (Nitrite +
Nitrate as N)
Unknown
Salinity Total Dissolved Solids,
Salinity
Unknown
Toxicity Toxicity Unknown
Miscellaneous pH (high) Unknown
Salado Creek Fecal Indicator Bacteria Fecal Bacteria Unknown Salinity Salinity Unknown
San Joaquin River Pesticides DDT
(Dichlorodiphenyltrichlor
oethane), Group A
Pesticides, DDE
(Dichlorodiphenyldichloro
ethylene)
Unknown
Pesticides Chlorpyrifos, Diazinon Approved, 12/20/2006
Salinity Electrical Conductivity,
Specific Conductivity,
Total Dissolved Solids
Unknown
Toxicity Toxicity Unknown
Miscellaneous Temperature, water Unknown
Other Organics Alpha-BHC
(Benzenehexachloride or
alpha-HCH)
Unknown
Metals/Metalloids Mercury Unknown
Notes:

TMDLs required, with expected dates unknown
Sources: Central Valley Regional Water Quality Control Board, 2014 and 2019.

7.2.c
Packet Pg. 642 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Flood Hazard Mapping
The FEMA Flood Insurance Rate Map (FIRM) associated with the Flood Insurance Study (FIS 06099CV000A) that contains the Zacharias planning area indicates that some portions of the project lie within Del Puerto Creek Zone AO (Exhibit 3.9-2), which is a flood hazard area predicted to have flood depths of 1 to 3 feet (generally sheet flow on sloping terrain) in a 100-year flood event (1 percent annual chance flood hazard)
The FEMA FIRM that contains the Baldwin planning area (also FIS 06099CV000A) indicates that a minor portion of the eastern edge of the project lies along the western edge of Salado Creek shaded Zone X area (Exhibit 3.9-3), which is a flood hazard area predicted to have flood depth of less than 1 foot in a 500-year flood event (0.2 percent annual chance flood hazard).

Groundwater
The City of Patterson overlies the Delta-Mendota Groundwater Subbasin (5-022.07; Delta-Mendota Subbasin), which covers 1,170 square miles in western Fresno, Madera, Merced, and Stanislaus counties and is a subbasin of the San Joaquin Valley Groundwater Basin. A summary of hydrogeologic characteristics of the Delta-Mendota Subbasin as reported in California Department of Water Resources (DWR) Bulletin 118 is detailed as follows.

Hydrogeologic Formations
The primary groundwater-bearing units of the Delta-Mendota Subbasin consist of unconsolidated terrace, alluvium, and flood-basin deposits of alternating beds of clay, sand, and gravel in the Tulare Formation geologic unit, which includes the alluvial fan materials of Del Puerto Creek and Salado Creek. The relatively large grain size of the upslope alluvial fan deposits suggests their value as possible recharge sites, whereas the downslope Corcoran Clay layers define the confining units important to the Delta-Mendota Subbasin aquifers.

The Delta-Mendota Subbasin near Patterson contains two primary aquifers separated by the Corcoran Clay confining unit: a lower fully-confined water-bearing zone (“lower aquifer”) and an upper semi-confined zone (“upper aquifer”). The Corcoran Clay unit is present under the City of Patterson and thins out to the west as the Del Puerto Creek alluvial fan rises toward the base of the Coast Range near Interstate 5 and the Delta-Mendota Canal. The lower aquifer can range below ground surface to about two-thousand feet deep. The upper aquifer extends to depths ranging from about 150 feet to greater than 350 feet below ground surface. The lower aquifer is utilized as a source of groundwater for drinking water and other uses such as agricultural irrigation, whereas upper aquifer groundwater is of lower quality. While the upper aquifer water is considered nonpotable, it is used for agricultural irrigation.

Local Hydrogeological Studies
Kenneth D. Schmidt and Associates (KSA) conducted a series of hydrogeological studies in the Patterson area over the past 20 years. In the most recent studies, KSA drilled new borings and performed well tests along the Del Puerto Creek alluvial fan in 2017 to assess the best site conditions for potential recharge basins that could recharge the lower aquifer recharge. This study confirmed

7.2.c
Packet Pg. 643 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx previous KSA work that the confining Corcoran Clay layer thins out to the west near the DeltaMendota Canal and the California Aqueduct.

Groundwater Level Trends
Within the area of the Delta-Mendota North-Central Groundwater Sustainability Plan (GSP), the long-term trends for both the upper and lower aquifers indicate similar levels of fluctuations over time; groundwater elevations typically increased or remained relatively stable during the period from the 1980s through the early 2000s. Wells in the lower aquifer generally exhibited fewer seasonal differences in groundwater elevations, with a general decline during the 2012-2016 drought years followed by recovery in 2017-2018.

Based on wells monitored, maintained and measured by DWR and cooperators, groundwater elevations in upper aquifer wells were generally stable (±10 feet) between 2005 and 2010. The Groundwater Information Center’s interactive map showed that depth-to-groundwater remained steady in the upper aquifer from 2012 to 2018, in the range of 80- to 100-feet below ground surface in the proposed Zacharias project area.

A pattern of increased drought-driven groundwater pumping, accompanied by declining groundwater elevations, followed by recovery is a predominant factor to be considered in the sustainable management of both aquifers in the Delta-Mendota Subbasin.

Groundwater Recharge
Most of the natural recharge to the lower aquifer of the Delta-Mendota Subbasin near Patterson occurs from runoff and infiltration in the alluvial fans from the Coast Range streams along the western side of the basin. Rainfall, creek and overland runoff and irrigation water percolation recharge the upper aquifer.

Natural inflows to the upper and lower aquifers in the Patterson area were estimated by KSA and reported in the City’s Water Master Plan to be 3,500 acre-feet per year (AFY) in the upper aquifer and 8,900 AFY in the lower aquifer, based on basin hydraulic conductivity, transmissivity, and gradients. Additional seepage from irrigation canals, percolation of irrigation water, and stream flow percolation likely contribute additional recharge into the upper aquifer.

The WMP identifies the area between the Delta-Mendota Canal and the California Aqueduct as potentially most amenable to development of percolation ponds as a means to recharge the lower aquifer, with the intent of implementing a pilot recharge project to determine specific recharge capacity. Specifically, subsurface geologic conditions, investigated via well boring logs beneath the Del Puerto Creek alluvial fan near the Delta-Mendota Canal suggest favorable conditions for intentional lower aquifer recharge, whereas to the east along Zacharias Road conditions are not as favorable.

Groundwater Storage
Annual changes in groundwater storage for both the upper and lower aquifers in the Northern and Central Delta-Mendota Region were generated through the development of recent water year (WY) budgets to estimate annual and cumulative change in storage relative to the start of the historic

7.2.c
Packet Pg. 644 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx water budget period in WY2003 (GSP 2019). Cumulative change in storage from WY2003 through WY2013 were derived from available hydrograph data, whereas cumulative change in storage from WY2014 through WY2018 were estimated based on the average change in storage by water year type (wet, average, dry, and Shasta critical) as correlated between WY2003 to WY2013. Both aquifers followed the same trend: changes in storage were negative for the same 12 out of the 16 years of study, and negative for same four out of the eight wet and average water year types. Despite periods of wet conditions where recharge outpaced extractions, an overall declining trend in groundwater storage was observed in both the upper and lower aquifers. Between WY2003 and WY2018, groundwater storage declined more rapidly in the upper aquifer at 830,000 acre-feet (AF) compared to the lower aquifer at 160,000 AF.

Groundwater Quality
Groundwater in the Delta-Mendota Subbasin is characterized by mixed sulfate to bicarbonate types in the northern and central portion with areas of sodium-chloride- and sodium sulfate-rich waters in the central and southern portion. Shallow, saline groundwater occurs within about 10 feet of the ground surface over a large portion of the Delta-Mendota Subbasin with localized areas of high concentrations of iron, fluoride, nitrate, and boron; the primary constituents of concern are nitrates, total dissolved solids (TDS) and pesticides.

Groundwater in shallower aquifers, such as that above the Corcoran Clay within the City of Patterson, generally contain higher concentrations of anthropogenic contaminants than in deeper aquifers, indicating pollutants from current land use activities. Reported chemical contaminants that may affect groundwater in the San Joaquin Valley Region include salinity (evaporation and poor drainage); boron and chloride (evaporation); nitrate (fertilizer); agricultural pesticides and herbicides; volatile organic compounds (industrial solvents, petrochemicals); and naturally occurring arsenic, gross alpha, and uranium. In the City of Patterson, two production wells supply water from the upper aquifer. These withdrawals can exceed total dissolved solids (salinity) maximum contaminant level (MCL) as well as nitrate and chloride MCL standards and thus are used exclusively for outdoor irrigation and other non-potable uses.

City of Patterson Municipal Water Supply
The City supplies citizens and businesses with potable water from seven production wells screened in the lower aquifer, which requires only disinfection prior to distribution. Water quality in the lower aquifer is generally suitable for potable use, however there are some instances of high TDS and Chrome 6 levels. Hexavalent chromium (chromium 6) was detected above the MCL of 10 micrograms per liter in the City supply when testing for a stricter standard was ordered in 2014 by the State Water Resources Control Board, Division of Drinking Water. The City proposed a Corrective Action Plan in 2015 that included moving well screen depths to portions of the aquifer that potentially contain lower chromium 6 levels. However, in 2017, the chromium 6 MCL was withdrawn as stipulated by a court order so changes to screen depths were not implemented. A new standard has not yet been established; however, the Chrome 6 levels would not be in compliance if the 2014 standard was re-imposed. The City’s most recent Consumer Confidence Report indicates that there were no sampled constituent exceedances of State or Federal MCL standards in the lower aquifer.

7.2.c
Packet Pg. 645 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-8 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Annual pump capacity of the seven potable wells is 6,620 AFY, with 3.5 million gallons of storage tank capacity (WMP, 2018). Total potable water demand in 2018 was 3,102 AFY. Due to implementation of an effective water conservation program, 2018 water demand was about 16 percent lower than 2013 water demand as reported in the WMP. Future potable water demand for the year 2040 was estimated to be 9,642 AFY, taking into account the proposed project and the City’s planned conservation efforts at the time the WMP and UWMP (2016) were developed. The City’s UWMP reports a baseline (current) water use rate of 135 gallons per capita per day (GPCD) versus the 2020 target water use rate of 164 GPCD. More recent data were not available, though the UWMP reported that the City expected to be in compliance in 2020 based on current usage and conservation patterns.

3.9.3 - Regulatory Framework
Federal
Clean Water Act
Section 303 of the Clean Water Act requires states to adopt water quality standards for all surface waters of the United States. Water quality standards may be numeric, although narrative criteria based upon biomonitoring methods may be employed where numerical standards cannot be established or where they are needed to supplement numerical standards. See a description of the California State Porter-Cologne Water Quality Control Act, below, for California’s implementation framework. Standards are based on the designated beneficial use(s) of the water body. Where multiple uses exist, water quality standards must protect the most sensitive use.

National Pollutant Discharge Elimination System
Construction
Section 402 of the Clean Water Act mandates that certain types of construction activity comply with the requirements of the National Pollutant Discharge Elimination System (NPDES) stormwater program. In California, permitting occurs under the statewide General Permit for Stormwater Discharges Associated with Construction Activity (“Construction Permit”), issued through the State Water Resources Control Board (State Water Board) and implemented and enforced by nine Regional Water Quality Control Boards (RWQCBs). The project site is within the boundaries of the Central Valley RWQCB.

The NPDES General Permit for Storm Water Discharges Associated with Construction Activity (Order 2009-0009-DWQ as amended by Order 2010-0014-DWQ and Order 2012-0006-DWQ) – Order 2012- 0006-DWQ became effective on July 12, 2012 and covers construction projects that disturb one (1) or more acres or are part of a larger common plan of development that disturbs more than 1 acre in total (e.g., large linear utility projects). The Order requires that construction activities that disturb land equal to or greater than 1 acre be permitted under the NPDES program, and that a Waste Discharge Identification Number must be on file with the City, before any work begins. A project must also submit a Notice of Intent to the State Water Board prior to the beginning of construction.

Once the Construction Permit is issued, it requires permittees to develop and implement a Storm Water Pollution Prevention Plan (SWPPP) that shall be amended or revised when necessary to meet the following objectives:

7.2.c
Packet Pg. 646 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-9
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx

1. Identify all pollutant sources of sediment that may affect the quality of storm water discharges associated with construction activity (stormwater discharges) from the construction site.

2. Identify non-storm water discharges.

3. Identify, construct, and implement Best Management Practices (BMPs) in accordance with a time schedule to reduce or eliminate pollutants in storm water discharges and authorized non-storm water discharges from the construction site during construction.

4. Develop a maintenance schedule for BMPs installed during construction designed to reduce or eliminate pollutants after construction is completed (post-construction BMPs).

Over the last decade, the State Water Board adopted a series of amendments to the Construction Permit. One of the most notable amendments involves Best Management Practices (BMPs). The Construction Permit now requires specific BMPs as well as numeric action levels (NALs) so that minimum federal standards are met, a SWPPP and a Rain Event Action Plan (REAP) are developed by a certified Qualified SWPPP Developer (QSD), and that the discharger comply with specific BMPs and NALs. Construction activities are also required to control pollutant discharges that utilize best available technology economically achievable (BAT) for toxic and non-conventional pollutants, and best conventional pollutant control technology (BCT) for conventional pollutants.

Construction activity subject to this permit includes clearing, grading and disturbances to the ground such as stockpiling, excavation, or landscaping operations. Regulations and requirements must be met during the construction phase of all new development projects, primarily through control of discharges of pollutants into storm drains or creek channels. Avoidance of such discharges can be attained by the use of seasonal- and phase-appropriate effective BMPs, including erosion control, run-on and runoff control, sediment control, active treatment systems, good site management, and non-storm water management through all phases of construction until the site is fully stabilized by landscaping or the installation of permanent erosion control measures. These criteria are required to be established in the SWPPP, conforming to the prevailing CASQA BMP construction handbook, Caltrans stormwater quality construction site BMP handbook, and/or any other or newer BMPs available since the release of the handbooks, as required given project needs. When project construction is completed, the applicant must file a notice of termination.

Stormwater Discharges
The current municipal stormwater permit under the NPDES permit program (Phase II Small MS4 General Permit, 2013-0001-DWQ; “Phase II Permit”) that is in effect for the City of Patterson was issued by the State Water Board in 2013. The permit requires that permittees implement controls to reduce discharge of pollutants from their MS4s to the maximum extent practicable and to effectively prohibit non-stormwater discharges into municipal storm drain systems and watercourses. The permit incorporates stormwater pollution management requirements for post construction stormwater management as set forth in Section E.12.

Section E.12 requires that new development projects incorporate post-construction stormwater pollution management measures in addition to standard BMPs that include stormwater treatment

7.2.c
Packet Pg. 647 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-10 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx measures, stormwater site design measures, and source control measures that control stormwater pollution after the construction of a project. These requirements include that permittees shall regulate development to comply with the following Sections:

E.12.b Site Design Measures
E.12.c. Regulated Projects
E.12.d. Source Control Measures
E.12.e. Low Impact Development (LID) Design Standards
E.12.f. Hydromodification Measures
E.12.g. Enforceable Mechanisms
E.12.h. Operation and Maintenance of Storm Water Control Measures E.12.i. Post-Construction Best Management Practice Condition Assessment E.12.j. Planning and Development Review Process
E.12.k. Post-Construction Storm Water Management Requirements Based on Assessment and Maintenance of Watershed Processes
E.12.l. Alternative Post-Construction Storm Water Management Program State
Porter-Cologne Water Quality Control Act
The Porter-Cologne Water Quality Control Act of 1969 authorized the State Water Board to provide comprehensive protection for California’s waters through water allocation and water quality protection. The State Water Board implements the requirements of the Clean Water Act Section 303, indicating that water quality standards have to be set for certain waters by adopting water quality control plans under the Porter-Cologne Act. The Porter-Cologne Act established the responsibilities and authorities of the nine RWQCBs, which include preparing water quality plans for areas in each region, identifying water quality objectives, and issuing NPDES permits and Waste Discharge Requirements.

Central Valley Regional Water Quality Control Board
The current Central Valley RWQCB Basin Plan (2018) includes the Delta-Mendota Canal Hydrologic Unit 541.10 Patterson, a sub-basin of the San Joaquin River Hydrologic Unit. Beneficial uses designated for the Patterson sub-unit include municipal and domestic supply, irrigation, stock watering, recreation-1 (contact), recreation-2 (other noncontact), freshwater habitat (warm), and wildlife habitat. The Basin Plan designates or establishes such beneficial uses of waters to be protected, water quality objectives to protect those uses, and a program of implementation needed for achieving the objectives. Water quality objectives are defined as limits or levels of water quality constituents and characteristics established for reasonable protection of beneficial uses or prevention of nuisance.

7.2.c
Packet Pg. 648 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-11
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Urban Water Management Planning Act of 1983 and Water Conservation Act of 2009 The State of California passed Assembly Bill (AB) 797 in 1983, further amended in 1990 and 1991, to require municipal water suppliers serving more than 3,000 customers or supplying more than 3,000 AF annually to prepare and adopt Urban Water Management Plans (UWMP) with specified elements. The UWMPs must be updated every five years to include projections of both potable and recycles water use, identify current reclamation practices, address additional alternative conservation measures, and describe findings, actions, and planning related to a number of water conservation and reclamation measures. In addition, an Urban Water Shortage Contingency Plan must be prepared and updated every five years, specifying proposed measure for response to shortand long-term water shortages.

The State of California passed Senate Bill (SB) X7-7 as a water conservation measure seeking a 20 percent statewide reduction in urban per capita water use by December 31, 2020. SB X7-7 required that each retail water agency preparing a 2010 UWMP must calculate baseline water use as well as an interim (for 2015) and final (for 2020) water use reduction target using specified guidelines.

Sustainable Groundwater Management Act
The State of California established a legislative framework for sustainable groundwater management, the Sustainable Groundwater Management Act (SGMA), that became law on September 16, 2014. SGMA requires governments and water agencies to halt overdraft and bring groundwater basins into balanced levels of pumping and recharge within a specified timeframe depending on a groundwater basin prioritization system that ranks each groundwater basin’s overdraft condition (e.g., low, medium, high priority, etc.).

Groundwater basins in California are vulnerable to six types of undesirable results (UCS 2017), which GSPs are to be designed to avoid. These undesirable results include:

1. Significant and unreasonable reduction of groundwater storage.

2. Significant and unreasonable lowering of groundwater levels.

3. Significant and unreasonable seawater intrusion.

4. Significant and unreasonable degraded water quality.

5. Significant and unreasonable land subsidence.

6. Significant and unreasonable depletions of interconnected surface water.

There is no technical definition for sustainability. It is not simply the presence or absence of a result like land subsidence that is in itself undesirable; rather, it is the extent to which the result is undesirable. For each undesirable result, the local community will be tasked to decide how much damage is acceptable, or conversely, how much repair is desired. Despite the flexibility around local sustainability goals, there are two definite boundaries that limit the interpretation of sustainability.

The California Water Code states that one basin’s definition of sustainability cannot threaten others’ ability to achieve their sustainability goals (Section 10733(c)), and, second, indicates that both continued overdraft and significant depletion of interconnected surface waters are unacceptable long-term strategies (Section 10735.2(a)(5)).

7.2.c
Packet Pg. 649 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-12 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx The California Department of Water Resources’ (DWR) Groundwater Update (2013) has identified the Delta-Mendota Subbasin as a critically overdrafted basin. SGMA requires that local agencies form Groundwater Sustainability Agencies (GSAs) to manage basins sustainably and that GSPs are adopted for these critically overdrafted basins by January 2020 with measures necessary to attain sustainable conditions in those subbasins by 2040. A GSP must generally outline how the GSA will implement, manage and measure specific actions for the health and viability of the basin. The City of Patterson has elected to form its own GSA within City boundaries and is a partner in the Northern & Central Delta-Mendota GSP Group along with other local GSAs.

A public draft version of the Northern & Central Delta-Mendota groundwater sustainability plan (GSP, 2019) was submitted to the State of California in January 2020 for review and public comment.

Groundwater management measures expected to be implemented include:

Increased conservation and efficiency
Increased groundwater recharge
Increased water recycling and reuse
Integrated groundwater management with other water resources (such as stormwater) Lower aquifer pumping limitations to minimize inelastic land subsidence The GSP (2019) includes policies from the City of Patterson’s General Plan for urban development and land use projections to 2030 and 2050, including designated expansion areas that encompass future developments the Zacharias and Baldwin planning areas. These planning areas are included in Chapter 5.4.6 in the GSP under the “Projected Water Budget with Climate Change and Project & Management Actions” section, where future projected conditions are evaluated.

Local
City of Patterson
Standard Specifications
The City of Patterson Standard Specifications (Willett, 2011), Section 8, require that detention basins be designed with a capacity to hold the total runoff from a 10-year frequency, 24-hour event if gravity discharge is used. For pump discharge, the capacity shall be large enough to hold the total runoff from a 50-year frequency, 24-hour event. Detention basins shall be provided with outlet facilities capable of draining a full basin within 48 hours.

Stormwater Standards Manual
The Multi-Agency Post-Construction Stormwater Standards Manual (Larry Walker Associates, 2015) summarizes regulatory requirements to assist the development community in complying with the requirements of Provision E.12 of the Phase II Permit and local ordinances.

The manual provides guidance for planning, implementing, and maintaining effective control measures with the intention of improving water quality and mitigating potential water quality impacts, including hydromodification, from stormwater and non-stormwater discharges, and provides tools to address the following objectives:

7.2.c
Packet Pg. 650 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-13
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Establish the methodology to consider the effects of stormwater runoff from a new development or redevelopment project during the project planning phase; Minimize contiguously-connected impervious surfaces in areas of new development and redevelopment, and where feasible, to maximize on-site infiltration of stormwater runoff; Implement site design measures to preserve, create, or restore areas that provide important water quality benefits such as riparian corridors, wetlands, stream and buffers, and maintain, protect, and improve underlying soil quality;
Provide source control measures to minimize the transport of and/or eliminate potential sources of pollution to stormwater runoff or run-on into the MS4 and receiving waters; Implement Low Impact Development (LID) control measures to reduce and/or eliminate the volume of stormwater runoff and pollutants leaving the project site; Control post-construction peak stormwater runoff discharge volumes and velocities (hydromodification) to mitigate impacts from downstream erosion and to protect downstream habitat; and
Develop tools for effectively operating, managing, and maintaining stormwater control measures
General Plan
The City of Patterson General Plan sets forth the following goals and policies relevant to hydrology and water quality:

Goal PS-1: To maintain an adequate level of service in the City’s water system to meet the needs of existing and future development.

Policy PS-1.1: Water Supply. The City shall continue to use groundwater as a source of domestic water for the city. The City shall also pursue, as expeditiously as possible, acquisition of surface water rights to supplement its water supply in order to accommodate projected water demand and provide for water supply security.

Policy PS-1.2: City-owned systems. The City shall expand and develop water treatment, distribution, and storage facility systems to accommodate the needs of existing and planned development.

Policy PS-1.3: Supply for new development. The City shall not approve any new development without the demonstrated assurance of an adequate water supply to support such development and a City-approved funding mechanism to pay for necessary improvements.

Policy PS-1.4: Agency coordination. The City shall coordinate, to the extent feasible, with other agencies involved in water resource development in the region.

Goal PS-3: To maintain an adequate level of service in the City’s storm drainage system to accommodate runoff from existing and future development and to prevent property damage due to flooding.

7.2.c
Packet Pg. 651 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-14 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Policy PS-3.2: Expansion of drainage systems. The City shall expand and develop storm drainage facilities to accommodate the needs of existing and planned development.

Policy PS-3.3: Drainage districts. The City shall form storm drainage districts as needed to ensure that storm drainage facilities are properly constructed, operated, and maintained.

Policy PS-3.4: Fair share costs. The City shall, through a combination of drainage improvement fees and other funding mechanisms, ensure that new development pays its fair share of the costs of drainage system improvements.

Policy PS-3.5: Pollutant requirements. Future drainage system discharges shall comply with applicable state and federal pollutant discharge requirements.

Policy PS-3.6: National Flood Insurance Program. The City shall continue to participate in the National Flood Insurance Program. To this end, the City shall ensure that its regulations are in full compliance with standards adopted by the Federal Emergency Management Agency.

Policy PS-3.7: Finish floor elevation – residential development. New residential development, including mobile homes, shall be constructed so that the lowest floor is at least 12 inches above the 100-year flood level.

Policy PS-3.8: Finish floor elevation – non-residential development. Non-residential development shall be anchored and flood-proofed to prevent damage from the 100-year flood or, alternatively, elevated to at least 12 inches above the 100-year flood level.

Policy PS-3.10: Storm drainage improvements required. Construction of storm drainage improvements shall be required, as appropriate, to prevent flooding during periods of heavy rainfall. Where feasible, storm drainage facilities should continue to be combined with park facilities.

Policy PS-3.11: Conditions for grading. The City shall impose appropriate conditions on grading projects performed during the rainy season to ensure that silt is not conveyed to storm drainage systems.

Policy PS-3.12: Detention basins. The City shall ensure that stormwater detention basin designs provide safety for the public, are visually appealing and unobtrusive, incorporate wildlife habitat, and, where feasible, offer recreational opportunities.

Policy PS-3.13: Surface pollutant control. The City shall require new development to incorporate runoff control measures to minimize discharge of surface pollutants into drainage systems. Examples of potential programs include:
- The use of “bioswales” and similar features (such as infiltration trenches, filter trips, and vegetated buffers) to trap contaminants;
- Installation of grease/oil separators to keep these contaminants out of storm runoff; - Regular street sweeping programs to prevent the buildup of oil, grease, and other contaminants and keep them from being swept into creeks and rivers; - Minimizing pesticide use and promoting the use of natural pest controls; - Encouraging the installation of “gray water” systems.

7.2.c
Packet Pg. 652 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-15
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Policy PS-3.14: Erosion control. The City shall require new development to incorporate erosion control measures to minimize sedimentation of streams and other natural drainage features.

Goal HS-2: To prevent loss of life, injury, and property damage due to flooding.

Policy HS-2.1: Flood control management. The City shall prepare and adopt flood management plans and practices aimed at protecting life and property from the harmful effects of flooding. As part of this effort, the City shall establish criteria for:
- Evaluating whether new development should be located in flood hazard zones; - Identifying construction methods or other methods to minimize damage if new development is located in flood hazard zones, and
- Maintaining the structural and operational integrity of essential public facilities during flooding.

Policy HS-2.4: FIRM Program. The City shall continue to participate in the National Flood Insurance Program. To this end, the City shall ensure that its regulations are in full compliance with standards adopted by the Federal Emergency Management Agency.

Policy HS-2.5: Flood protection for residences. New residential development, including mobile homes, shall be constructed so that the lowest floor is at least 12 inches above the 100-year flood level.

Policy HS-2.6: Flood protection for non-residential development. Non-residential development shall be anchored and flood-proofed to prevent damage from the 100-year flood or, alternatively, elevated to at least 12 inches above the 100-year flood level.

Policy HS-2.8: Provision of storm drains. Construction of storm drainage improvements shall be required, as appropriate, to prevent flooding during periods of heavy rainfall.

Policy HS-2.9: Prevention of siltation. The City shall impose appropriate conditions on grading projects performed during the rainy season to ensure that silt is not conveyed to storm drainage systems.

Policy HS-2.10: Flooding impacts of new development. New development with the potential to increase flooding impacts on adjoining or downstream properties shall be prohibited.

Policy HS-2.11: Priority for flood control improvements. The City’s first priority in preventing risks to life and property resulting from flooding shall be to designate appropriate land uses in areas subject to flooding. Only when this land use-based approach is not sufficient to reduce hazards to life and property to acceptable levels will the City support the construction of new flood control projects.

Policy HS-2.12: Buildable site. Parcels shall not be created upon which the presence of easements, floodplain, marsh or riparian habitat, or other features would leave insufficient land to build and operate structures. This policy shall not apply to open space lots specifically created for dedication to the City or another appropriate party for habitat protection, flood control, drainage, or wetland maintenance.

7.2.c
Packet Pg. 653 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-16 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Policy HS-2.13: Bridge construction. New and modified bridge structures shall not cause an increase in water surface elevations of the 100-year floodplain exceeding one foot, unless analysis clearly indicates that the physical and/or economic use of upstream or downstream property will not be adversely affected.

Policy HS-2.14: Runoff control. The City shall require all new urban development projects to incorporate runoff control measures to minimize peak flows of runoff and/or assist in financing or otherwise implementing comprehensive drainage plans. All such control measures shall consider potential affects to adjacent property owners.

Policy HS-2.16: Flood hazard mitigation prior to development. The City shall not approve new development in areas subject to a 100-year flood event, based on FEMA or on other updated mapping acceptable to the City, unless and until the flood hazard has been mitigated. Such mitigation may be accomplished by one, or a combination of, the following:
- Compliance with Title 17 of the City’s Municipal Code, Flood Hazard areas. - Installation of flood control improvements along Del Puerto Creek and/or Salado Creek. - Avoidance of flood prone areas.

Policy HS-2.17: Flood hazard mitigation prior to development. The City shall require any development on land subject to a 100- year flood event, based on Federal Emergency Management Agency (FEMA) or on other updated mapping acceptable to the City, to conform to National Flood Insurance Program (NFIP) standards.

Policy HS-2.18: Low Impact Development. New development shall incorporate provisions for low impact development as defined by as minimizing or eliminating pollutants in storm water through natural processes and maintaining pre-development hydrologic characteristics, such as flow patterns, surface retention, and recharge rates.

Municipal Code
The City of Patterson Municipal Code establishes the following requirements that pertain to hydrology and water quality:

Title 13, Chapter 13.32 purpose and intent is to protect and promote the health, safety, and general welfare of the citizens of Patterson by limiting discharges of non-storm-water into the storm water conveyance system caused by spills, dumping or disposal of materials other than storm water, and by reducing pollutants in urban storm water discharges to the maximum extent practicable.

Chapter 13.32 also intends to protect and enhance the water quality of watercourses, water bodies, and wetlands in a manner pursuant to and consistent with the Federal Clean Water Act (33 U.S.C. Section 1251 et seq.) and any subsequent amendments thereto, by reducing pollutants in storm water discharges to the maximum extent practicable and by prohibiting non-storm-water discharges to the maximum extent practicable into the storm drain system (Ord. 777 § 1 (part), 2015), including:
- Prohibition of discharges of pollutants or waters containing any pollutants that cause or contribute to a violation of applicable water quality standards.

7.2.c
Packet Pg. 654 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-17
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx - Codification of federal and state requirements for stormwater pollution prevention and required compliance with statutes and regulations as detailed in this regulatory framework section.

Title 16, Chapter 16.64 requires that applicants proposing divisions of land pay fees for constructing planned drainage facilities for the removal of surface and storm water from local or neighborhood drainage areas prior to the filing of any final map or parcel map.

Title 17, Chapter 17.12 sets forth standards for development in flood hazard areas. The chapter requires that new construction comply with federal floodplain safety requirements, including elevating residential structures 1 foot above the 100-year flood elevation in FEMA Zones A1-30, AE, and AH. Residential structures in Zone AO must be elevated, including basement, above the highest adjacent grade as least as high as the depth number specified in feet on the FIRM plus one foot, or at least three feet if no depth number is specified. Nonresidential structures either adhere to residential requirements or be floodproofed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water, is resistant to hydrostatic and hydrodynamic loads and effects of buoyancy and is certified by a registered professional engineer or architect.

3.9.4 - Methodology
Balance Hydrologics, Inc. analyzed the potential hydrologic and water quality impacts associated with the proposed Zacharias Master Plan, based on the Administrative Draft Environmental Impact Report Project Description and other project documents within the context of local, state, and federal regulations.

Phased development is expected within the project envelope, which is defined as two distinct areas.

The Zacharias planning areas is located north of existing Patterson city limits. Areas to the west of Baldwin Road are designated as industrial and commercial space, while residential neighborhoods are planned for areas east of Baldwin Road. The Baldwin planning area is located south of existing Patterson city limits at the current southern terminus of Baldwin Road. Residential neighborhoods are planned for this area. From a hydrologic and water quality perspective, potential impacts of the planning areas would generally be similar and thus are grouped together for analysis; when needed the Zacharias or Baldwin planning areas are individual analyzed.

3.9.5 - Thresholds of Significance
In accordance with Appendix G of the CEQA Guidelines, the impact of the proposed project on hydrology and water quality would be considered significant if it would:
a) violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality;
b) substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin;

7.2.c
Packet Pg. 655 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-18 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx c) substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner that would:
(i) result in substantial erosion or siltation on- or off-site (ii) substantially increase the rate or amount of surface runoff in a manner that would result in flooding on or off-site;
(iii) create or contribute runoff water that would exceed the capacity of existing or planned stormwater drainage systems, or provide substantial additional sources of polluted runoff; or
d) in flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation; (Refer to Section 7, Effects Found Not To Be Significant) e) conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan.

3.9.6 - Project Impacts and Mitigation Measures
This section discusses potential impacts associated with development of the project and provides mitigation measures where appropriate.

Water Quality
Impact HYD-1: Buildout of the Master Plan may violate water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality?
Impact Analysis
This impact will address surface water quality and groundwater quality.

Surface-Water Quality
Construction Phase
Project implementation would involve the development of up to 5,391 dwelling units, 7,765,000 square feet of non-residential uses, 29 acres of school space, 65 acres of park space, and 13 acres of open space on 1,293 acres at full build-out across the combined Zacharias and Baldwin planning areas (WSA 2020). Existing PID irrigation canals that cross the project may be realigned to accommodate roadway improvements and may be relocated underground as pipelines. A setback will be established between the Delta-Mendota Canal and development of the Baldwin planning area. For the purposes of this EIR, buildout is assumed to occur over a 20-year period.

During construction activities in the Zacharias planning area, clearing, grading and other activities would increase the potential for on-site erosion, potentially leading to increased turbidity and sedimentation via overland sheet flow into existing PID irrigation canals as well as Salado Creek and ultimately into the San Joaquin River. The southern-most boundary east of Baldwin Road in the Zacharias planning area is adjacent to a piped section of Salado Creek from east of Cliff Shallow Drive to Ward Avenue. The creek is daylighted upstream and downstream of this area, and there is

7.2.c
Packet Pg. 656 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-19
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx potential for soil erosion to occur along project boundaries during construction in areas where temporary soil storage is required.

During construction activities in the Baldwin planning area, clearing, grading and other activities would increase the potential for on-site erosion, potentially leading to increased turbidity and sedimentation via overland sheet flow into Salado Creek and ultimately into the San Joaquin River. In addition, the western boundary of the Baldwin planning area is adjacent to the Delta-Mendota Canal, so there is potential for soil erosion to occur along project boundaries during construction in areas where temporary soil storage is required.

Other pollutants that might impact surface water quality during project construction include petroleum products (gasoline, diesel, kerosene, oil and grease), hydrocarbons from asphalt paving, paints, solvents, and litter. An accidental release of any of these substances could degrade the water quality of the surface water runoff.

Because the project would disturb more than one acre of land, the applicant is required to prepare a Stormwater Pollution Prevention Plan (SWPPP), per the NPDES Construction Permit requirements through the State Water Resources Control Board (State Water Board). The SWPPP would address potential erosion and sedimentation issues through a project-specific erosion control plan, as well as other best management practices (BMPs) to reduce the potential for spills and other contamination from on-site construction activities. Appropriate BMP implementation measures for control of sediment and other pollutants from construction sites can be found in the most recent version of the CASQA BMP construction handbook, Caltrans stormwater quality construction site BMP handbook, and/or any other or newer BMPs available since the release of the handbooks, as required given project needs. The project SWPPP is likely to include, but is not limited to, the following BMPs related to construction water-quality impacts:

If the entire site is not graded in a single operation, leave existing vegetated areas undisturbed until construction of improvements on each portion of the development site is ready to begin; Immediately re-vegetate or use erosion control measures to otherwise protect all disturbed areas from both wind and water erosion during and after completion of grading; Collect storm water runoff into stable drainage channels and/or small drainage basins to prevent the buildup of large, potentially erosive storm water flows; Direct runoff away from all areas disturbed by construction; Use sediment ponds or siltation basins to trap eroded soils before runoff is discharged into onsite or off-site drainage culverts and channels; Install straw rolls, hay bales or other approved materials below all disturbed areas adjacent to Salado Creek to prevent eroded soils from entering the stream channel. Maintain these facilities until all disturbed upslope areas are fully stabilized, in the opinion of the City Engineer;
To the extent possible, schedule major site development work involving excavation and earthmoving for construction during the dry season;

7.2.c
Packet Pg. 657 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-20 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Develop and implement a Standard Operation Procedures program for the handling, storage, use, disposal of fuels and hazardous materials, and which shall contain a contingency plan covering accidental hazardous materials spill;
Avoid cleaning, fueling, or maintaining vehicles on-site, except in an area designated to contain and treat runoff; and
During and after construction, inspect all drainage facilities immediately downstream of the grading site for accumulated sediment, and clear these facilities of debris and sediment as necessary;
BMP performance and effectiveness shall be determined either by visual means where applicable (e.g., observation of above-normal sediment release), or by actual water sampling in cases where verification of contaminant reduction or elimination (such as inadvertent petroleum release) is required by the Central Valley RWQCB to determine adequacy of the measure;
In the event of significant construction or final landscape installation delays, native grasses or other appropriate vegetative cover shall be established on the construction site as soon as possible after disturbance, as an interim erosion control measure throughout the wet season.

In compliance with the requirements of the statewide NPDES Construction Permit, the City or its qualified SWPPP developer will prepare a SWPPP for submittal with a Notice of Intent to the Central Valley RWQCB prior to the start of construction. The SWPPP would specify BMPs to be employed during the construction phase to control sediment loads and pollutants. The SWPPP shall include the minimum BMPs required for the identified Risk Level of the project and receiving waters. BMP implementation shall be consistent with the BMP requirements in the most recent version of the California Stormwater Quality Association Stormwater Best Management Handbook-Construction or the Caltrans Stormwater Quality Handbook Construction Site BMPs Manual.

Mitigation Measure HYD-1a requires implementation of a SWPPP in conjunction with each development phase of the Master Plans. Proper implementation of the project-specific SWPPP would reduce the potential construction-related water quality impacts to a less than significant level.

Operational Phase
The proposed project would increase impervious surfaces as new roads, parking areas, and rooftops are built out. Parking lots are prone to contributing oil, grease, metal brake dust, and trash to stormwater runoff. While rooftop runoff does not typically contribute stormwater contaminants at levels as high as from parking areas, contributions from rooftops includes airborne deposition of particulate matter that may subsequently be carried into the stormwater drainage system and could be elevated given the proximity of Interstate 5 and traffic associated with the project itself.

Impervious areas and associated stormwater drainage systems can provide an efficient conveyance system for other potential contaminants, including fertilizers and pesticides, to the receiving streams. Untreated, the above contaminant sources are likely to adversely impact water quality in Salado Creek and downstream San Joaquin River.

7.2.c
Packet Pg. 658 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-21
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Similar to other projects within the City of Patterson, the project will be required to comply with the Phase II Small MS4 Permit (Phase II Permit), which prescribes methods for residential, commercial and industrial developments to control and treat stormwater runoff. The Phase II Permit requires project proponents to incorporate site design measures, source controls, stormwater treatment measures, and/or other low impact development (LID) measures to reduce stormwater runoff and limit the transport of pollutants to receiving waters. The Phase II Permit also requires implementation of source control measures for specific pollution-generating activities such as accidental spills or leaks and landscape/outdoor pesticide use. Potential sources of runoff pollutants are identified by the City (such as Patterson General Plan Policy PS-3.13: Surface pollutant control and Policy PS-3.14: Erosion Control, as well as Patterson Municipal Code Chapter 13.32) that require implementation of appropriate permanent and operational source control BMPs.

Under existing conditions, stormwater runoff within the existing Zacharias planning area predominantly infiltrates into agricultural fields or moves across the landscape as overland flow toward Salado Creek to the south-southeast. Stormwater runoff within the existing Baldwin planning area predominantly infiltrates into agricultural fields or moves across the landscape to the east as overland flow toward Salado Creek. Under post-project conditions, stormwater discharge from impervious surfaces, including roof, roadway, sidewalk and hardscape would be directed to on-site stormwater runoff basins that meet Phase II Permit water quality treatment requirements. The master plans have designated basin locations that would be worked into the landscaped areas surrounding the proposed buildings, parking areas, roads, and related impervious infrastructure.

Stormwater runoff basins would be located in areas where design percolation rates have been tested and calculated by a registered hydrogeologist (Soares, 2013; Ballard and Krause, 2019a,b,c and 2020), and which support fulfillment of Phase II Permit BMP design requirements. Under postproject conditions, the project would include approximately 765 acres of permeable surfaces (approximately 62 percent of the 1227.1-acre project site), suggesting that ample space would be available in which to accommodate appropriate stormwater treatment BMP features.

The proposed project is required to comply with provisions of the Phase II Permit for postconstruction best management practices and incorporate LID concepts into the project design in order to reduce post-project runoff (and associated non-point-source contaminant transport) to receiving waters. The project applicant will be required to prepare and submit a Stormwater Quality Management Plan (SWQMP) to the City of Patterson for review and approval prior to issuance of building permits for the proposed project. The plan would require documentation of stormwater quality control measures to ensure that runoff associated with operational activities would not contribute to the degradation of water quality in downstream waterways. Proper design, sizing, and implementation of the stormwater basins would effectively address both water quality and hydromodification concerns. Documentation is required once final designs are completed in order to verify compliance with the water quality and hydromodification provisions. Implementation of the stormwater control plan, in compliance with the NPDES Phase II permit, would reduce potential stormwater quality and hydromodification impacts to a less than significant level. No further mitigation is required.

7.2.c
Packet Pg. 659 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-22 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Groundwater Quality
The stormwater treatment BMPs discussed above are intended to maximize infiltration, assuming infiltration rates are sufficient and that depth to the seasonal groundwater peak elevation meets the performance/design standards of the BMPs. If not, underdrains may be required. Under either scenario, the BMPs are expected to meet water quality treatment standards as required under Provision E.12 of the Phase II Permit.

All stormwater runoff within the Zacharias planning area will ultimately drain to two lakes, and then be pumped up to a basin for recharge to groundwater in order to support the City’s effort to sustainably manage the lower aquifer that supplies potable water to the City. Technically, stormwater treatment BMPs may not be required in this area, as the planning area will not discharge to the City storm drain system or to any surface receiving water (such as Del Puerto Creek, Salado Creek or the San Joaquin River; essentially, the planning area will operate as a large self-retaining area). However, direct drainage of stormwater to the receiving detention/retention ponds without treatment could result in accumulation of contaminants within the retention lake, that could ultimately be pumped up to the recharge basin.

Pretreatment, which refers to design features that provide settling of large particles before stormwater runoff enters a stormwater treatment control measure, is important to ensure proper operation of a bioretention facility and reduce the long-term maintenance burden. Pretreatment (e.g., vegetated swales, proprietary devices) must be provided to reduce the sediment load entering a bioretention facility in order to prevent the engineered planting media and/or underlying soil from being occluded prematurely and maintain the infiltration rate of the bioretention facility.

Additionally, for sites with high infiltration rates (or where recharge is desired), pretreatment is required to protect groundwater quality.

The proposed recharge basin location was specifically selected due to the occurrence of relatively high infiltration rates in that area and a thinning out of the Corcoran clay layer, and thus may not provide adequate treatment in order to protect groundwater quality, especially considering that it is recharging to the lower aquifer that serves as the City’s primary source of drinking water. This would be a significant impact to groundwater quality. The following mitigation measure requires the Zacharias Planning area to incorporate stormwater quality BMPs similar to those that are required for the Baldwin Planning Area (because that portion does ultimately drain to Solado Creek).

Level of Significance Before Mitigation
Potentially significant impact.

Mitigation Measures
MM HYD-1a Prior to issuance of the first grading permit for each development phase of either the Baldwin Master Plan or Zacharias Master Plan, the applicant shall prepare and submit a Stormwater Pollution Prevention Plan to the City of Patterson for review and approval that demonstrate the use of stormwater treatment Best Management Practices (BMP) identified in the most recent version of the California Stormwater

7.2.c
Packet Pg. 660 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-23
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Quality Association Stormwater Best Management Handbook-Construction or the Caltrans Stormwater Quality Handbook Construction Site BMPs Manual.

MM HYD-1b Prior to issuance of the first building permit for each development phase of either the Baldwin Master Plan or Zacharias Master Plan, the applicant shall prepare and submit drainage plans to the City of Patterson for review and approval that demonstrate the use of Low Impact Development practices, bioswales, bioretention and other forms of stormwater treatment Best Management Practices pursuant to the NPDES Phase II stormwater permit (or most recently approved permit).

Level of Significance After Mitigation
Less than significant impact.

Groundwater Supply and Recharge
Impact HYD-2: Would buildout of the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin? Impact Analysis
This impact addresses groundwater supply and recharge.

Groundwater Supply
The City of Patterson will supply potable and non-potable water to the project. The City obtains all their water supply from groundwater and does not currently purchase or import water or have any current plans to do so in the future. The City anticipates developing new well heads within the Zacharias planning area to extract potable water from the lower aquifer in support of increased water demand due to the project, when project buildout requires it. All parks and public landscape space will be irrigated with non-potable water.

The Delta-Mendota groundwater subbasin, from which the City’s potable water is extracted, was classified as a critically overdrafted aquifer under SGMA in 2014. SGMA required that GSAs in critically overdrafted areas prepare and submit a GSP by January 31, 2020 with measures necessary to attain sustainable conditions in those subbasins by 2040. The City of Patterson formed a GSA and became a member of the Northern & Central Delta-Mendota GSP Group. The group submitted a draft GSP to the state in January 2020 (GSP 2019) that outlines projects and management actions to halt long-term declines in groundwater storage in both the upper and lower aquifers.

On a regional scale, primary groundwater management measures that would be implemented via the GSP include increased conservation and efficiency, increased groundwater recharge, increased water recycling and reuse, integrated groundwater management with other water resources such as stormwater, and lower aquifer pumping limitations relative to water levels at key index wells to minimize inelastic land subsidence (GSP 2019).

On a local scale, the City of Patterson assessed future water demand needs in recent water management planning documents (WMP 2018; UWMP 2016). The City selected a portfolio for water

7.2.c
Packet Pg. 661 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-24 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx supply that includes groundwater pumping for potable and non-potable use, recycled water, stormwater capture, and conservation. The WMP also evaluated supply options that included import or purchase of water, but deemed that they are not necessary at this time and would require additional study if they were to eventually be implemented in coming years. The WMP concluded that, with the implementation of planned projects and conservation efforts, the City’s potable and non-potable water supply is sufficient to support expected growth over the 30-year planning period (including growth associated with development at the project site), and that expected water usage would not significantly impact groundwater resources in the subbasin from which the City draws its supply.

The total annual groundwater pumping capacity of the City is 7,550 AFY (as of 2018), with about 3,318 AFY of that capacity currently being utilized (WSA 2020). Potable water demand in 2018 was 3,102 AFY and non-potable was 216 AFY. An Operational Yield Study (WMP 2018) was conducted to estimate the volume of groundwater that the City could safely extract from the Delta-Mendota Subbasin. The study concluded that the City could construct additional groundwater wells to increase its pumping capacity to the range of 10,000 – 12,000 AFY without impacting current groundwater pumping infrastructure and without significantly impacting the use of groundwater resources in the area surrounding the City’s Sphere of Influence (which would include the Zacharias planning area once annexed). Under the City’s selected future supply portfolio, it is assumed that the City would construct enough potable wells to produce up to 10,115 AFY at buildout (WAS , 2020), which would be on the low side of the range found to be without significant impacts to groundwater infrastructure or groundwater resources. Accordingly, increased water demand from this project (which has been included in the City’s long-term demand projections) will not result in significant impacts to groundwater supply relative to other users in the area. Additionally, as discussed further below, the proposed project would contribute to recharge of the lower aquifer through infiltration of stormwater runoff from the project site, contributing to sustainable operation of the City’s potable groundwater supply, as well as having a markedly smaller upper aquifer water demand.

Total existing water demand for the project area was estimated to be 5,384 AFY, of which 5,370 AFY was estimated as the maximum non-potable groundwater withdrawals for agricultural use (drawn from the upper aquifer) and 14 AFY was residential potable water use (WSA 2020). Groundwater withdrawals were lower in years when surface water supplies were available. 1 Total predicted water
demand of the project at full build-out is projected as 2,159 AFY for an average water year, a net reduction compared to existing conditions (WSA 2020).

Project-Specific Potable Water Supply
Even though overall water use would decrease under post-project conditions, the amount of potable water needed would increase. Projected potable water demand would be 1,560 AFY, an increase in demand of 1,546 AFY from the lower aquifer relative to existing conditions. In order to support the City’s goal to sustainably manage the underlying groundwater resources, the project has plans to pump all stormwater runoff to a newly established recharge basin located west of the project, centered within the footprint of an abandoned gravel-mining quarry adjacent to the south side of 1 Surface water deliveries to agricultural lands in the Zacharias planning area ranged from approximately 750 AFY to 2300 AFY between 2009-2019 (pers. comm. Maria Encinas, City of Patterson via information supplied by West Stanislaus Irrigation District).

7.2.c
Packet Pg. 662 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-25
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Del Puerto Creek, north of Zacharias Road and east of Raines Road. Hydrogeological studies by KSA indicate that recharge basin(s) near the Delta-Mendota Canal would recharge to the lower aquifer.

Thus, the recharge basin site selected for this project (in coordination with the City) is expected to help replenish the City’s potable water supply more so than it would if recharge were concentrated at the project site itself, where infiltration to the lower aquifer would be impeded by the presence of the Corcoran clay confining layer.

The WSA (2020) concluded that the City of Patterson has an adequate groundwater supply to serve the project area while also serving the City’s current customers. Recommendations to reduce projected demand include additional conservation programs, requiring high water efficiency standards for all fixtures, appliances and industrial processes installed in the project area, and consideration of requiring the use of drought tolerant landscaping or requiring other actions to improve landscape efficiencies. Furthermore, the WSA recommended that the City and project stakeholders confirm phasing of the development and coordinate with the GSA group implementing the Northern & Central Delta-Mendota Region GSP so that the City’s supply projects can be implemented appropriately to ensure a reliable supply for all of its customers through the project build-out.

Project-Specific Non-Potable Water Supply
In addition to the potential impacts to potable water sources discussed above, the project may also affect water supply in the upper aquifer (non-potable supply). The projected non-potable water demand of the project is expected to be 599 AFY, a decrease in demand of 4,771 AFY from the upper aquifer, water which could be used elsewhere, or which would support sustainable management through net pumping reductions within the upper aquifer. Although diverting stormwater runoff from the project site up to the proposed recharge basin (and ultimately to the lower aquifer) would decrease the amount of water available for infiltration to the upper aquifer directly beneath the site, the potential estimated reduction in upper aquifer recharge is considerably less than the decrease in pumping from the upper aquifer (4,771 AFY) that would result from the conversion of the project site from primarily agricultural (non-potable) water use to urban (potable) water use.

The WSA (2020) provides a simplified estimation of the amount of stormwater that would have the potential to recharge the upper aquifer of 1,185 AFY (but which is to be pumped to the recharge basin instead as a result of an agreement between the project applicant and the City, to better support the City’s potable water supply), based on the project area and the City’s annual average rainfall of 11 inches per year. This volume serves as the upper-bound of the average long-term change in recharge to the upper aquifer on the project site itself. In addition, Debler and Chapman (2020) estimated an average annual runoff volume of 598 AFY based on Zacharias project area, mean annual precipitation and a mean runoff coefficient per basin area, which yields a more likely average long-term volume of potential recharge to the upper aquifer (excluding project plans to pump stormwater to the recharge basin). Some of that stormwater runoff volume may still recharge to the upper aquifer, through infiltration in treatment BMPs or within the distributed detention/retention basins located within the project site.

It is important to note that the WSA (2020) makes the assumption that the project will retain and infiltrate all stormwater on-site into the upper aquifer, which differs from the assessment herein. The

7.2.c
Packet Pg. 663 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-26 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx current plans to divert stormwater to the proposed recharge basin at the upper end of the alluvial fan to support lower aquifer recharge was the result of an agreement between the project applicant and the City, to better support the City’s potable water supply. Still, as discussed above, this difference from the analysis in the WSA does not conflict with the ultimate conclusion that there will not be a significant impact to water supply in the upper aquifer.

Summary
In summary, based on the discussion above, the net effect of the project would be to:

Reduce pumping from the upper aquifer as a result of conversion to urban uses; Reduce recharge to the upper aquifer as a result of diverting stormwater runoff to the loweraquifer recharge basin, but at a substantially smaller average annual rate than the increase associated with #1 above;
Increase usage of potable water by 1,546 AFY (provided by the City), but still within the acceptable range of operational limits of the City’s facilities and without impacting the use of groundwater resources in the area surrounding the City (per the Operational Yield Study in the WMP, 2018);
Increase recharge of water to the lower aquifer to help offset the increase in potable water demand at the project site, and to help the City achieve its sustainability goals under the SMGA GSP.

In coordination with the City of Patterson, the project has identified conservation strategies that reduce potable water demand and aquifer recharge strategies that support lower aquifer recharge to optimize potable water supply. Required implementation of conservation measures and other potential supply and/or recharge activities would further support sustainable groundwater management of the basin. In concert with implementation of SGMA requirements, the above project plans and City requirements would reduce the potential impacts related to groundwater quantity and recharge to a less than significant level.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is required.

Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 664 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-27
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Drainage
Impact HYD-3: Buildout of the Master Plans may alter the existing drainage pattern of the site that may create erosion or downstream flooding problems.

Impact Analysis
This impact addresses drainage issues including erosion and siltation, the stormwater drainage system, and on-site and off-site flooding.

Erosion or Siltation
Construction-related impacts relating to erosion or siltation both on and off-site are discussed in Impact HYD-1. Implementation of the project-specific SWPPP, in compliance with the Central Valley RWQCB Construction Permit requirements, would mitigate the impact related to erosion and downstream flooding during project construction. The resulting construction-related impacts would be less than significant. No further mitigation is required.

Runoff and potential pollution (including sediment) generated by newly impervious surfaces, as discussed in Impact HYD-1, will be mitigated through implementation of Mitigation Measures HYD1a and HYD-1b such that impacts related to high flows, erosion or increased pollutant levels in downstream waterbodies would be avoided. The resulting post-construction related impacts related to potential hydromodification effects would be less-than-significant. No further mitigation is required.

Stormwater Drainage System
The proposed project would increase the amount of impervious surfaces within the project area by as much as 460 acres, which is likely to increase the amount and rate of surface-water runoff and result in flooding within or downstream of the project site if not adequately controlled. The project includes installation of a new storm drainage system consisting of retention and detention basins, lakes, bioswales, inlets, and underground piping that would be designed to capture and detain runoff from the project area in compliance with City of Patterson Standard Specifications, Section 8, Storm Drainage. Compliance with City development standards would ensure that the proposed storm drainage system is appropriately designed and implemented in order to prevent flooding onsite, as the project applicant would be required to submit storm drainage master plans to the City of Patterson for review and approval prior to permit issuance such that impacts would be avoided.

Zacharias Master Plan
Balance Hydrologics assessed the potential for flooding in the Zacharias Master Plan area. An accompanying Technical Memo is provided in Appendix H.

The storm drainage control facilities will be implemented within the Zacharias Master Planning Area with the intention of achieving following:

Flood Control for the 10-year, 24-hour storm (detention basins) for individual areas, and corresponding Supervisory Control and Data Acquisition (SCADA) outlet devices and lines.

7.2.c
Packet Pg. 665 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-28 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Flood Control for the 100-year, 24-hour storm (retention basins & wet basin lakes) for the entire Zacharias Master Planning Area.

The FEMA Solution for retaining the 100-year FEMA floodplain (183 acre-feet of runoff based on the 100-year Flood Depths for Del Puerto Creek Hydraulic Model by Balance Hydrologies, Inc.) for the Zacharias Master Planning Area.

Recharge of the stormwater runoff into the lower aquifer groundwater table below to Corcoran Clay Layer, where the City’s potable water wells draw water from.

The storm drainage system will utilize multiple stages of storage involving both detention and retention purposes for the project site. The Zacharias Ranch Planning Area will utilize a mix of detention (designed for 10-year, 24-hour storage) and retention (designed for 100-year, 24-hour storage) basins. Both types of basins will have SCADA gravity outlet systems with corresponding pipelines to meter the flow out of the basins. The retention basins will be designed to drain stormwater through the SCADA system for up to a 10-year, 24-hour storm event, with the basin retaining and percolating the runoff for corresponding drainage areas for any storm event exceeding a 10-year, 24-hour event; up to a 100-year, 24-hour event. The TPF Development and Keystone Ranch Planning Areas will each have a retention basin with corresponding SCADA outlet systems draining to the lakes. The Ivy Rose Gardens Planning Area will have a detention basin with a pump station and force main for metering water out of the basin to the lakes. The pump station will be designed for a minimum 1360 gallons per minute (gpm) flowrate.

The Lakeside Hills Development Area will have a series of wet basin lakes for flood control. These lakes will be designed to hold the entirety of the 100-year, 24-hour storm event for the Lakeside Hills Development Area, as well as the difference between the 100-year and 10-year events for the detention basins within the Zacharias Ranch and Ivy Rose Gardens Planning Areas. This will achieve the ultimate goal of storing the 100-year, 24-hour storm event for the entirety of the Zacharias Master Planning Area between the lakes and retention basins. Consequently, the lakes will store the 10-year, 24-hour storm event for the entire Zacharias Master Planning Area, as both the detention and retention basins will drain to the lakes for any storm event equal to or below the 10-year event.

The lakes will drain to a pump station that will meter out through a force main to the FEMA Basin.

The pump station will have a maximum output of 2000 gpm for draining the lakes. Note that the dry basins (detention basins and retention basins) are designed for a maximum 48-hour drawdown period, whereas the lakes are not required as such.

The FEMA Basin will act as a solution to the FEMA requirement to divert or retain the 100-year flood runoff for the Zacharias Master Planning Area. The basin will be designed with a two-stage system for an upper reservoir and lower reservoir area. The lower reservoir will be utilized during smaller storms for a combination of runoff from the floodplain, and for intermediate storage for the stormwater pumped from the lakes. The upper reservoir will be reserved for major storms where floodplain runoff exceeds the lower reservoir. The basin will be designed to percolate the FEMA floodplain runoff within a 48-hour drawdown period. The basin will have an inlet structure attached to the force main coming from the wet basin lakes, and an outlet structure with corresponding pump station. The basin pump will operate at a maximum 2000 gpm flowrate, so as to drain the

7.2.c
Packet Pg. 666 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-29
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx stormwater coming from the lakes, and a channel will be provided to minimize infiltration occurrence for the water from the lakes.

The outlet force main from the FEMA Basin will flow to the Recharge Basin Facility, to the northwest of the Zacharias Master Planning Area. The Recharge Basin Facility will be located at the existing rock quarry, where a location has been designated by the City of Patterson. The location noted does not have the Corcoran Clay Layer (an impervious layer separating the potable and non-potable water tables), and instead infiltrates directly into the lower aquifer. The overall Zacharias Master Planning Area will have an annual runoff of 604 acre-feet per year, or 0.539 million gallons per day. The vast majority of this stormwater will be recharged through the Recharge Basin Facility.

The project area facilities provided will be subject to the most up-to-date version of the City of Patterson’s Multi-Agency Post Construction Manual, and the corresponding Phase II Permit requirements for stormwater. The developers for each project area will be responsible for meeting these requirements within their project areas (Zacharias Ranch, TPF Development, Keystone Ranch, Lakeside Hills, and Ivy Rose Gardens Planning Areas) and maintaining such facilities as required.

The Storm Drain Master Plan for the project area storm drain facilities is shown in Section 2, Project Description, Exhibit 2-9a. The FEMA Solution Basin and corresponding facilities is shown on Exhibit 2-9b, and the recharge Basin Facility and corresponding force main is shown on Exhibit 2-9c.

Analysis
Stormwater within the Zacharias planning area up to the 100-year event would be retained on-site and/or pumped up to a newly established groundwater recharge basin. The planning area would have a series of basins sized to accommodate the 10-year runoff volume for detention basins and the 50-year runoff volume for retention basins, per City of Patterson flood control requirements.

Runoff would be conveyed via storm drains within 48 hours to two centralized lake features that would be sized to accommodate the 50-year runoff volume. In a 100-year event, runoff beyond the 50-year holding capacity would be conveyed from the lakes via pumping approximately 2 miles west, upslope along Zacharias Road, to the off-site recharge basin.

For the Zacharias planning area, all stormwater runoff up to the 100-year event would be retained on-site and/or pumped to the planned recharge basin within a new drainage system, which would result in less-than-significant impacts to flooding potential. However, the proposed stormwater drainage system in the Zacharias planning area includes two lakes that would be fitted with pumps with the capacity to move stormwater runoff greater than the 50-year storage capacity of the lakes to the upslope recharge basin. A pump system failure could constitute a significant impact to onand/or off-site flooding. The following mitigation measure requires the Zacharias planning area to develop an emergency action plan for pump failure.

Mitigation Measure HYD-3a requires the first Zacharias applicant to develop an emergency action plan for pump failure to prevent downstream inundation. Implementation of Mitigation Measure HYD-3a would reduce the potential impact of flooding in the Zacharia planning area to a less than significant level.

7.2.c
Packet Pg. 667 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-30 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Baldwin Master Plan
In the Baldwin planning area, storm drains, inlets, and underground piping would convey runoff to stormwater basins within the project site. The basins will be sized to accommodate the 10-year runoff volume per City of Patterson flood control requirements and would connect to the existing municipal storm drainage system.

On-site Flooding
The proposed project would increase impervious surfaces within the project site by as much as 460 acres and would build storm drain networks consistent with the new project configuration. As discussed in Impact HYD-2, preliminary drainage plans indicate that stormwater runoff in the Zacharias planning area will be retained or detained in a series of on-site bioswales, basins and lakes sized to accommodate a 100-year flood event, and in the Baldwin planning area a basin would accommodate a 10-year flood event and CTE CAL, Inc. performed percolation tests, in accordance with Stanislaus County requirements for preparing and pre-saturating the soil in the test holes, to develop recommended drainage design infiltration rates in the proposed Zacharias planning area for the detention/retention basins, lakes, flood control basin and recharge basin. Drainage infrastructure for the project site will be completely new and designed for a capacity specific to meet the needs of the project site and in compliance with City of Patterson flood control requirements.

Zacharias Master Plan
Portions of the Zacharias planning area are designated as FEMA Zone AO, which is defined as subject to flood depths of 1 foot in a 100-year flood event (1 percent annual chance flood hazard). A FEMA Letter of Map Revision (LOMR) for the Villages of Patterson community, located to the east of the planning area across State Route 33 was submitted, and a revision approved (dated August 3, 2018), to change the FEMA designation for the community from Zone AO to Zone X (shaded), which removed it from the 100-year flood hazard area.

The Villages of Patterson remapping effort suggested that the Zacharias planning area subject to FEMA Zone AO would also be substantially reduced as a result of additional modeling that would show fewer flooding effects than the currently effective FEMA flood map of the area. New modeling was conducted that focused on flooding potential to the Zacharias planning area. Results estimated that flows above 1,600 cfs would overtop Del Puerto Creek to the south toward the planning area; the 100-year overflow volume was estimated as 182 AF. Overflows onto the south overbank area were predicted to be generally well-dispersed over the relatively uniform terrain with maximum flood depths generally less than 2 feet.

A proposed flood control retention basin along the Del Puerto Creek south overbank flow path would consist of an excavated area immediately north of Zacharias Road, located within the flow path and sized to retain the 182 AF of overflow from Del Puerto Creek that is predicted to occur during the 100-year flood event. The basin would cover an area of approximately 27 acres and would be sized to yield a total storage volume of approximately 189 AF with one foot of free board.

Berms and swales would be utilized to hold overbank flows to the north of Zacharias Road and direct flows into the flood control basin. Interception of overbank flow would essentially eliminate the flood hazard from Del Puerto Creek within the Zacharias planning area and would have the

7.2.c
Packet Pg. 668 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-31
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx collateral benefit of removing the same flood hazard from existing portions of the City to the south and east, a net improvement over existing conditions.

Baldwin Master Plan
The vast majority of the Baldwin planning area lies outside of any FEMA flood designation; the eastern edge of the planning area falls just within the western edge of a predicted Salado Creek Zone X area, defined as an area with 0.2% annual chance (500-year) flood hazard. Baldwin Road would be improved along the eastern edge of the planning area to accommodate planned traffic patterns (AMG, 2020), which would serve to eliminate the potential for Zone X flows to impact the area.

Off-site Flooding Potential
Zacharias Master Plan
In the Zacharias planning area, all stormwater up to the 100-yr event would be detained, retained and/or pumped to the recharge basin (Debler and Chapman, 2020), which would result in very little to no runoff leaving the site; this would improve downstream conditions relative to current conditions.

The proposed flood control basin would reduce the potential for flooding from Del Puerto Creek overbank flow into the project area as well into as existing portions of the City to the south and east, as described above. A planned FEMA LOMR study and application is expected to result in removal of all Zone AO areas within the Zacharias planning area, as well as portions of the City to the south and east, from the FEMA FIRM.

Baldwin Master Plan
In the Baldwin planning area, all stormwater up to the 10-year event would be detained/retained onsite in compliance with City requirements and then would drain north through the existing storm drain/irrigation lateral along Baldwin Road to Sperry Avenue, which could result in a significant impact to the downstream storm drain system, as existing Salado Creek capacity is limited from the Delta Mendota Canal north to the southern limit of existing residential development.

Implementation of site design and treatment measures mandated by the Phase II Permit and the City would have the effect of reducing and attenuating volumes and rates of runoff.

Mitigation Measure HYD-3b requires applicants to prepare and submit drainage plans that demonstrate that new development does not create downstream flooding problems.

Implementation of Mitigation Measure HYD-3b would reduce the potential impact of stormwater runoff from the Baldwin planning area to the downstream storm drain system to a less than significant level.

Summary
In summary, based on the discussion above, the net effect of the project would be to:

Installation of an all new stormwater drainage system that meets or exceeds City flood control requirements and reduces the impact of on-site flooding to a less-than-significant level.

7.2.c
Packet Pg. 669 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-32 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx In the Zacharias planning area, all stormwater up to the 100-yr event would be detained, retained and/or pumped to a recharge basin, thus no water would be expected to leave the site via overland flow. This stormwater plan complies with and exceeds City flood control requirements and would result in improved conditions downstream relative to current conditions.
- Implementation of mitigation measure HYD-3a in support of a pump failure action plan would bring potential impacts to a less-than-significant level.

The proposed flood basin would be designed to collect the Del Puerto 100-yr overbank flow event, thus effectively reducing the potential for flooding to the Zacharias planning area to a less-than-significant level and resulting in a net improvement to flood conditions within the City areas to the south-southwest of the planning area.

In the Baldwin planning area, all stormwater up to the 10-yr event would be detained on-site in compliance with City flood control requirements and then released to City stormwater system.
- Implementation of Mitigation Measure HYD-3b in support of detention/retention and/or metering of stormwater runoff up to the 100-year event would bring potential impacts to a less-than-significant level.

As summarized above, new stormwater infrastructure compliant with City requirements would eliminate potential concerns for exceedance of storm drain system capacity on the project site and a flood control basin would eliminate potential on-site or off-site flooding concerns. Implementation of the above actions in compliance with City requirements would reduce potential drainage and flooding impacts to a less than significant level.

Level of Significance Before Mitigation
Potentially significant impact.

Mitigation Measures
MM HYD-3a Prior to operation of the stormwater lift station that would serve the Zacharias Master Plan, the applicant shall prepare and submit an emergency action plan for lift station failure to the City of Patterson for review and approval. The plan shall outline pump and power redundancy plans, potential flow routing, and other potential actions to be taken if pump failure occurs. The approved plan shall be implemented.

MM HYD-3b Prior to issuance of a grading permit for the Baldwin Master Plan, the project applicant shall submit stormwater calculations to the City for approval that confirm that increases in downstream flow rates for storms greater than the 10-year event up to the 100-year event would not cause downstream flooding issues, or, submit plans for adequate additional detention, retention and/or metering to mitigate stormwater runoff to comply with the City Storm Drain Master Plan up to the 100- year peak flow event.

Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 670 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Hydrology and Water Quality
FirstCarbon Solutions 3.9-33
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx Drainage and Risk of Pollutants
Impact HYD-4: Buildout of the Master Plans would not result in release of pollutants due.

Impact Analysis
This impact addresses threshold of significance questions (d), focused on the potential for development activities to increase the risk of release of pollutants due to susceptibly to downstream flooding, erosion, or elevated pollutant levels as a result of increased impervious surfaces, which could lead to an increase in pollutant-laden runoff volume or peak flows.

Construction-related impacts relating to erosion or siltation both on and off-site would be avoided in compliance with the SWPPP as discussed in Impact HYD-1. Post-construction implementation of stormwater treatment BMPs in compliance with the Phase II Permit are also discussed in Impact HYD-1. The new stormwater drainage system will be designed to capture and detain all runoff from the project area in compliance with City of Patterson standards as discussed in Impact HYD-3.

Furthermore, implementation of the flood control basin as discussed in Impact HYD-3 would eliminate the risk of project area inundation from overbank flooding from Del Puerto Creek.

Implementation of these required strategies would result in avoidance of impacts related to increased pollutant levels in flood hazard zones. Flood hazard impacts causing an increased risk of pollutants associated with development in this area would be less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is required.

Level of Significance After Mitigation
Less than significant impact.

Conflicts With Water Management Plans
Impact HYD-5: Buildout of the Master Plans would not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan.

Impact Analysis
This impact addresses conflicts with an adopted water management plan.

Water Quality Control Plan
The currently effective Central Valley RWQCB Basin Plan (2018) includes the Delta-Mendota Canal Hydrologic Unit 541.10 Patterson, a sub-basin of the San Joaquin River Hydrologic Unit. Beneficial uses designated for the Patterson sub-unit include municipal and domestic supply, irrigation, stock watering, recreation-1 (contact), recreation-2 (other noncontact), freshwater habitat (warm), and wildlife habitat. The Basin Plan designates or establishes such beneficial uses of waters to be protected, water quality objectives to protect those uses, and a program of implementation needed for achieving the objectives. Water quality objectives are defined as limits or levels of water quality

7.2.c
Packet Pg. 671 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Hydrology and Water Quality Draft EIR

3.9-34 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-09 Hydrology.docx constituents and characteristics established for reasonable protection of beneficial uses or prevention of nuisance.

The implementation of a SWPPP during construction activities in compliance with the NPDES Construction Permit as described in Impact HYD-1 and implementation of a SWQMP in compliance with the Phase II permit as described in Impact HYD-1 brings the project into compliance with the Basin Plan and as such does not conflict with or obstruct implementation of a water quality control plan, and the potential impact would be less than significant.

Sustainable Groundwater Management Plan
The State of California established a legislative framework for sustainable groundwater management, the Sustainable Groundwater Management Act (SGMA), that became law on September 16, 2014. SGMA requires governments and water agencies to halt overdraft and bring groundwater basins into balanced levels of pumping and recharge within a specified timeframe.

GSAs within the Delta-Mendota Subbasin, which was listed as critically overdrafted, were required to submit GSPs by January 2020.

The City of Patterson created a GSA and joined with other GSAs to form the Northern & Central Delta-Mendota GSP Group. A draft GSP was submitted to the state in January 2020 that outlines projects and management actions to halt long-term declines in groundwater storage in both the upper and lower aquifers as discussed in Impact HYD-2. As also discussed in Impact HYD-2, project implementation of an infiltration basin to recharge stormwater into the lower aquifer, and a significant decrease in the amount of pumping from the upper aquifer support, the goals of the GSP.

The project is in compliance with City and SMGA requirements, and as such would have a less than significant impact on the sustainable groundwater management plan.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is required.

Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 672 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project)

7.2.c
Packet Pg. 673 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project)

THIS PAGE INTENTIONALLY LEFT BLANK

7.2.c
Packet Pg. 674 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project)

7.2.c
Packet Pg. 675 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project)

THIS PAGE INTENTIONALLY LEFT BLANK

7.2.c
Packet Pg. 676 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project)

7.2.c
Packet Pg. 677 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project)

THIS PAGE INTENTIONALLY LEFT BLANK

7.2.c
Packet Pg. 678 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx

3.10 - Land Use

3.10.1 - Introduction
This section describes the existing land use context and potential effects from project implementation on the site and its surrounding area. Descriptions and analysis in this section are based on site reconnaissance, review of the City of Patterson General Plan, the Patterson Municipal Code, the Stanislaus County General Plan, and Stanislaus Local Agency Formation Commission (LAFCo) procedures, and the proposed Baldwin and Zacharias Master Plans.

3.10.2 - Environmental Setting
Land Use
Baldwin Master Plan
The Baldwin Master Plan area contain agricultural land (orchards). A cluster of residential and agricultural buildings is present at the terminus of Baldwin Road. Exhibit 2-3 provides a photograph of this area.

Zacharias Master Plan
The area west of Baldwin Road contains agricultural land (orchards and row crops). A cluster of residential and agricultural buildings is present along Baldwin Avenue. Lateral Six South, a Patterson Irrigation District (PID) canal, runs south-to-north near Rogers Road.

The area east of Baldwin Road contains agricultural land (row crops) west of the PID Lateral M canal and the “Ranchette” residential area on the east side. PID Lateral Five South, an irrigation canal, runs south-to-north along Baldwin Road.

The approximately 137-acre Ranchette Triangle consists of 31 parcels, 24 of which support a residence. Of the 24 parcels with a residence, 15 of them are residential only (most of which are 1 acre or less). The largest parcels (4 acres or more) support most of the agricultural acreage. Six of the parcels totaling 47.73 acres are encumbered by active Williamson Act Contracts.

Exhibit 2-3 provides a photograph of this area.

Surrounding Area
Baldwin Master Plan
West
The Delta-Mendota Canal forms the western boundary of the Baldwin Master Plan area.

North
The City of Patterson Corporation Yard forms the northern boundary of the Baldwin Master Plan area.

East
Agricultural uses form the eastern boundary of the Baldwin Master Plan area.

7.2.c
Packet Pg. 679 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx South
Agricultural uses form the southern boundary of the Baldwin Master Plan area.

Zacharias Master Plan
West
Rogers Road, a partially improved two-lane road, forms the western boundary of the Zacharias Master Plan area. West of Rogers Road is the Arambel Business Park, which includes the Restoration Warehouse distribution center.

North
Zacharias Road, a rural two-lane road, forms the northern boundary of the Zacharias Master Plan area. North of Zacharias Road is agricultural land.

East
The California Northern Railroad tracks and Ward Avenue from the eastern boundary of the Zacharias Master Plan area. State Route 33 (SR-33), a two-lane state highway, parallels the east side of the tracks between Zacharias Road and Ward Avenue.

South
Existing residential and the Keystone Pacific Business Park form the southern boundary of the Zacharias Master Plan area.

Land Use Designations
County of Stanislaus
Baldwin Master Plan
The Stanislaus County General Plan designates the Baldwin Master Plan area as “Agriculture.” The Stanislaus County Zoning Ordinances zones the Baldwin Master Plan area as “General Agriculture (A2).” Zacharias Master Plan
The Stanislaus County General Plan designates the area west of the PID canal as “Agriculture.” The Stanislaus County General Plan designates the area east of the canal as “Urban Transition.” The Stanislaus County Zoning Ordinances zones the area west of the PID canal as “General Agriculture (A-2).” The Stanislaus County Zoning Ordinances zones the area east of the PID canal as “General Agriculture (A-2-10).”
City of Patterson
The City of Patterson General Plan designates the Master Plan areas as “Low Density Residential,” which is a non-binding designation. This is also a “placeholder” land use designation the City has assigned to unincorporated areas around the Patterson city limits and does not necessarily signify that the City intends for all of this land to be developed as low density residential.

7.2.c
Packet Pg. 680 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx Sphere of Influence
The approximately 137-acre Ranchette Triangle is within the Patterson Sphere of Influence. All other portions of the Master Plan area are outside the Sphere of Influence.

3.10.3 - Regulatory Framework
Local
City of Patterson
General Plan
The City of Patterson General Plan provides a blueprint for growth within the Patterson city limits and Sphere of Influence. The General Plan was adopted by the Patterson City Council on November 30, 2010. The General Plan contains the following topical chapters: Land Use, Housing, Community Design, Economic Development, Circulation, Air Resources and Climate Change, Public Services, Parks, Recreation and Cultural Resources, Health and Safety (Noise, Safety), Natural Resources (Conservation and Open Space), and Administration and Implementation. The General Plan includes the goals, policies, standards, implementation programs, quantified objectives, a draft land use diagram, and a draft circulation plan diagram that constitute the formal policy of the City of Patterson for land use, development, and environmental quality.

Municipal Code
The Patterson Municipal Code establishes specific regulations for land use activities and development within the City of Patterson. Title 18, Zoning, contains the City of Patterson Zoning Code, which promotes and protects the public health, safety, peace, morals, comfort, convenience, and general welfare of the public, and insures the orderly development of the City.

Stanislaus Local Agency Formation Commission
Stanislaus LAFCo reviews proposals for the formation of new local governmental agencies and for changes in the organization of existing agencies with Stanislaus County. Stanislaus LAFCo regulates, through approval or denial, boundary changes proposed by other public agencies or individuals.

Boundary changes are assessed against the criteria set forth in California Government Code Section 56668, which establishes factors LAFCo agencies must use in reviewing annexation proposals.

3.10.4 - Methodology
FCS evaluated the potential for land use impacts through site reconnaissance and review of applicable land use policy documents. FCS personnel performed site reconnaissance on the Master Plan areas and surrounding land uses on multiple occasions in 2018. Photographs were taken of the Master Plan areas and surrounding land uses to document existing conditions. FCS reviewed the City of Patterson General Plan, the Patterson Municipal Code, and the Stanislaus County General Plan to identify applicable policies and provisions that pertain to the proposed Master Plans.

7.2.c
Packet Pg. 681 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx

3.10.5 - Thresholds of Significance
According to the CEQA Guidelines’ Appendix G Environmental Checklist, to determine whether land use and planning impacts are significant environmental effects, the following questions are analyzed and evaluated. Would the project:
a) Physically divide an established community?
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Please note that the second threshold is evaluated in Impacts LU-2, LU-3, and LU-4 in the interests of distinguishing between the General Plan, Municipal Code, and LAFCo policy.

3.10.6 - Project Impacts Mitigation Measures
This section discusses potential impacts associated with the proposed Master Plan and provides mitigation measures where necessary.

Divide an Established Community
Impact LU-1: Buildout of the proposed Master Plans would not physically divide an established community.

Impact Analysis
This impact assesses whether the proposed Master Plans would physically divide an established community. For the purposes of this evaluation, an established community is defined as a grouping of occupied dwelling units inhabited by persons who would be involuntarily displaced by the buildout of the Master Plans.

Baldwin Master Plan
Buildout of the Master Plan would be limited to the Master Plan boundaries. No off-site improvements would be required that would have the potential to divide an established community.

The existing cluster of structures would be removed. This cluster would not constitute an “established community.” Moreover, their removal would be at the behest of their owner. Impacts would be less than significant.

Zacharias Master Plan
The 1,160 acres of the Master Plan area that excludes the Ranchettes contains agricultural land.

There are two clusters of residential and agricultural structures within this area that would ultimately be removed as the Master Plan builds out. These two clusters of structures would not constitute an “established community.” Moreover, their removal would be at the behest of their owners. Thus, buildout of this portion of the Master Plan area would not constitute the division of an established community.

The 137-acre Ranchette Triangle contains more than 30 separate parcels. The Master Plan allows property owners to continue existing land use activities after annexation. Thus, any change in land

7.2.c
Packet Pg. 682 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx use activities (including development to a higher and better use) would be the prerogative of the property owner.

The East-West Connection would cross through the Ranchette area. The alignment of this road follows an existing property line (west of Ward Avenue) and through a vacant land associated with a medical office building (east of Ward Avenue). The Master Plan applicant team have met with the affected property owners and found that there is preliminary support for this connection. The development of this roadway would not require removal of any structures. Moreover, it would allow for a direct connection from Ward Avenue and SR-33 to the Zacharias Master Plan area, which would improve circulation within Patterson. Impacts would be less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is necessary.

Level of Significance After Mitigation
Less than significant impact.

General Plan Consistency
Impact LU-2: Buildout of the proposed Master Plans would not conflict with the City of Patterson General Plan.

Impact Analysis
This impact assesses whether the proposed Master Plans would conflict with the General Plan.

Baldwin and Zacharias Master Plan
General Plan Amendment
The Master Plan areas are currently located outside the City of Patterson’s Sphere of Influence. As part of the project’s discretionary approvals, a General Plan Amendment would be processed to expand the City’s Sphere of Influence to encompass the 1,286-gross-acre Master Plan areas to be coterminus with the proposed annexation request. This General Plan Amendment is expected to occur concurrently with the annexation/pre-zoning approvals. Note that Stanislaus LAFCo would also be required to approve the Sphere of Influence expansion request.

This General Plan Amendment would ensure that the City of Patterson’s jurisdictional boundaries are in conformance with state requirements. Furthermore, because the General Plan contemplates annexation of the entire project site at some future, undetermined date, adjusting the Sphere of Influence to be co-terminus with expanded city limits would not be in conflict with any aspect of the General Plan. Impacts would be less than significant.

7.2.c
Packet Pg. 683 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Goals and Policies Consistency Analysis
Table 3.10-1 summarizes each Master Plan’s consistency with all applicable goals and policies of the General Plan. As shown in the table, the proposed Master Plan would be consistent with all applicable goals and policies of the General Plan. Impacts would be less than significant.

Table 3.10-1: General Plan Consistency Analysis
General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Goal LU-1 To provide for orderly, wellplanned, and balanced growth consistent with the limits
imposed by the city’s
infrastructure and
environmental constraints.

Consistent: The Master Plan
contemplates the development
of 305 dwelling units, parks,
and infrastructure on 66 acres.

The Master Plan would guide
the buildout of the site over a
period of 20 years. Therefore,
it would be considered orderly,
well-planned and balanced
growth.

Consistent: The Master Plan
contemplates the development
of 4,781 dwelling units, 7.76
million square feet of nonresidential uses, as well as schools, parks, and
infrastructure on 1,161 acres.

The Master Plan would guide
the buildout of the site over a
period of 20 years. Therefore,
it would be considered orderly,
well-planned and balanced
growth.

Policy LU1.1Development strategy. The
development strategy
embodied in the Patterson
General Plan is based on the
premise that the outward
urban expansion of the City
will occur through the
incremental annexation and
development of “complete”
neighborhoods, incorporating
the following characteristics:
a. A mix of housing products
and densities serving the
broadest range of
households, incomes and
ages;
b. A neighborhood center
containing higher density
residential development,
retail, restaurants,
entertainment, office, and
public uses within a short
walk or bicycle ride of
surrounding residences;
c. Parks, schools and other
public/quasi-public uses
within a short walk or
bicycle ride;
Consistent: The Master Plan
allows a mix of single-family
housing products, parks, and a
trail system. Because the
Master Plan would represent
the southern-most residential
development area in the City
of Patterson, non-residential
uses are neither feasible nor
desirable because of their
distance from main
thoroughfares
Consistent: The Master Plan
allows a range of housing
products including singlefamily and multi-family, light industrial uses, commercial
uses, a lakeside mixed use
activity area, two schools,
parks, and a trail system.

7.2.c
Packet Pg. 684 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan d. A complete and
interconnected system of
mobility consisting of
roadways, bicycle and
pedestrian paths, and
transit stops;
e. Short blocks with a
substantial tree canopy
shading the street and
sidewalk;
f. Connectivity to
surrounding
neighborhoods, regional
retail centers and
employment;
g. A sense of personal safety;
h. Elements that foster the
sustainable use of scarce
or non-renewable
resources.
i. Mixed-use development in
which complementary
uses are placed on a single
building site one above the
other (vertically) or in
close proximity
(horizontally).

Policy LU1.2Residential expansion areas.

To achieve the objectives
described in Policy LU-1.1, the
General Plan applies the Low
Density Residential designation
to areas contemplated for
new, residential development
outside the current (2010) City
limits. In such instances Low
Density Residential designation
is considered a “holding”
category which will apply until
such time as a general plan
amendment accompanied by a
planned development is
approved by the City, as
required by Policy LU-1.3.

Consistent: The Master Plan
proposes to amend the existing
Low Density Residential
designation to allow
development of the proposed
uses.

Consistent: The Master Plan
proposes to amend the existing
Low Density Residential
designation to allow
development of the proposed
uses.

Policy LU1.3Planned development
requirement -- Residential
Expansion Areas. Development
of areas outside the current
(2010) City limits designated
Consistent: The Master Plan
contains the following
components listed below:

Consistent: The Master Plan
contains the following
components listed below:

7.2.c
Packet Pg. 685 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-8 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Low Density Residential shall
be accompanied by an
application for a general plan
amendment, tentative
subdivision map, pre-zoning
and reorganization, as
necessary, consistent with a
planned development which
sets forth the following:
a. Land use plan. Each planned
development application shall
include a land use diagram
that clearly identifies the uses
allowed in each neighborhood
based on the land use
designations described in Part I
– Land Use Diagrams and
Standards. The qualities
desired in residential
expansion areas shall include,
but are not limited to, the
following:

A mix of housing products
and densities serving the
broadest range of
households, incomes and
ages;
A neighborhood center
containing higher density
residential development,
retail, restaurants,
entertainment, office, and
public uses within a short
walk or bicycle ride of
surrounding residences;
Parks, schools and other
public/quasi-public uses
within a short walk or
bicycle ride;
A complete and
interconnected system of
mobility consisting of
roadways, bicycle and
pedestrian paths, and transit
stops;
Short blocks with a
substantial tree canopy
shading the street and
sidewalk;
A land use plan with diagram A land use plan with diagram

7.2.c
Packet Pg. 686 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-9
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Connectivity to surrounding
neighborhoods, regional
retail centers and
employment;
A sense of personal safety;
Elements that foster the
sustainable use of scarce or
non-renewable resources;
The appropriate qualities for
a given project will be
determined by the City
Council on a case-by-case
basis consistent with the
policies and implementation
measures of the General
Plan.
b. A description of housing
products. Each planned
development application shall
describe the range of housing
products allowed within the
project. The description shall
include:
i. Building type (single-family
detached, single family
attached, apartments,
townhome, etc.);
ii. Gross residential density
for each product type;
iii. Building elevations;
iv. Number of bedrooms;
v. Colors and materials;
vi. Tenure (for-sale, for rent);
vii. Target income group by
product type.

A description of housing
products
A description of housing
products
c. General development
standards. These standards
shall be applied to all
development regardless of
land use category and shall
address such topics as site
access, energy efficiency and
sustainability,
fences/screening, noise
mitigation, outdoor lighting
standards, and the placement
of utilities.

General development
standards
General development
standards
d. Land use-specific development Land use-specific development Land use-specific development

7.2.c
Packet Pg. 687 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-10 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan standards. The planned
development application shall
describe the site development
standards to be applied to new
development by each land use
category.
standards standards
e. Services and infrastructure
plans. Infrastructure plans for
water supply, wastewater
collection and treatment,
storm water runoff, and
circulation shall be required. In
addition, the planned
development shall describe the
provision of necessary
facilities, equipment and
staffing for police and fire
protection, parks and
recreation, and schools.

Services and infrastructure
plans
Services and infrastructure
plans
f. Infrastructure financing
program. Each planned
development shall be
accompanied by an
infrastructure financing
program which sets forth the
method of revenue generation
(e.g., special district, etc.), the
obligations of the project and
the City towards the cost of
infrastructure necessary to
serve the project.

Infrastructure financing
program
Infrastructure financing
program
g. Phasing plan. Each planned
development application shall
be accompanied by a phasing
plan which describes the
following:
i. The boundaries of each
phase reflecting a logical
order of development;
ii. The number of dwelling
units in each phase by
tenure and target income
group, and the acreage and
estimated building floor
area for each nonresidential land use type;
iii. Infrastructure plans for
each phase, including
Phasing plan Phasing plan

7.2.c
Packet Pg. 688 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-11
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan water supply, wastewater
collection, storm drainage
and circulation, along with
the location and acreage
designated for other public
facilities required for each
phase. Such facilities may
include, but is not limited
to, school sites, police and
fire protection facilities and
parks.

LU-1.5 Multiple applications. The City
recognizes that it may be
desirable to allow for the
consideration of multiple
residential projects under a
single planned development
project. In allowing such
combinations, no remnant
areas within a residential
expansion area shall be
excluded, and each must be
approved by the City prior to
development.

Not Applicable: The Baldwin
Master Plan consists of a single
application.

Consistent: The Zacharias
Master Plan consists of
multiple applications. The
Master Plan includes the
Ranchette Triangle even
though those property owners
are not parties to the
application in the interests of
avoiding the exclusion of
remnant areas.

Policy LU1.6Small town character. The City
shall seek to preserve
Patterson’s traditional smalltown qualities and agricultural heritage, while increasing its
residential and employment
base.

Consistent: The Master Plan
proposes a ‘Modern Mission’
design theme that incorporates
historic and contemporary
elements that are locally
recognizable as unique to
Patterson. This is consistent
with the objective of
preserving small-town qualities
and agricultural heritage while
increasing its residential base.

Consistent: The Master Plan
proposes a ‘Modern Mission’
design theme that incorporates
historic and contemporary
elements that are locally
recognizable as unique to
Patterson. This is consistent
with the objective of
preserving small-town qualities
and agricultural heritage while
increasing its residential and
employment base.

Policy LU1.7Preferences for the timing of
urban development. In
general, the preferred timing
of urban development in
accordance with the General
Plan is as follows:
a. First Priority—Vacant or
underutilized areas within
the current City limits;
b. Second Priority—Vacant or
underutilized areas within
the City’s current adopted
Consistent: The Master Plan
area is outside the current city
limits and Sphere of Influence
and, therefore, would be
considered “Third Priority.”
There are no existing properly
zoned parcels within the city
limits or Sphere of Influence
that are large enough or
available for the proposed
Master Plan.

Consistent: The Master Plan is
outside the current city limits
and Sphere of Influence and,
therefore, would be
considered “Third Priority.”
There are no existing properly
zoned parcels within the city
limits or Sphere of Influence
that are large enough or
available for the proposed
Master Plan.

7.2.c
Packet Pg. 689 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-12 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan sphere of influence;
c. Third priority—Vacant or
underutilized areas within
the General Plan area.

Policy LU8Managing the pace of
development. The City shall
link the rate of growth in
Patterson to the provision of
adequate services and
infrastructure, including
schools. The City shall, through
specific plans and/or planned
development plans for major
projects, ensure that urban
development proceeds in an
orderly fashion and in pace
with the expansion of public
facilities and services.

Consistent: The proposed
Master Plan includes a planned
development that would
ensure development proceeds
in an orderly fashion and in
pace with economic
conditions. The project
includes the development of
urban roadways and utility
infrastructure. Furthermore,
this EIR ensures that adequate
services and infrastructure
would be available to serve the
proposed Master Plan. As such,
the proposed Master Plan
would be served with
adequate facilities and
services, and therefore, would
constitute orderly growth.

Consistent: The proposed
Master Plan includes a planned
development that would
ensure development proceeds
in an orderly fashion and in
pace with economic
conditions. The project
includes the development of
urban roadways and utility
infrastructure. Furthermore,
this EIR ensures that adequate
services and infrastructure
would be available to serve the
proposed Master Plan. As such,
the proposed Master Plan
would be served with
adequate facilities and
services, and therefore, would
constitute orderly growth.

Policy LU1.9Managing the relationship
between jobs and housing. The
City shall monitor residential
and non-residential
development and encourage
adjustments as necessary in
land use designations and the
rate of project approvals to
promote a reasonable citywide
balance between new
employment-generating
development and housing
development and to minimize
traffic impacts.

Consistent: The proposed
Baldwin Master Plan would
develop 305 dwelling units.

The Master Plan would add
1,203 residents at buildout.

The Master Plan’s residential
uses are well suited to serve
West Patterson Business Park
and Arambel Business Park
employees and, thus, facilitate
jobs-housing balance.

Consistent: The proposed
Master Plan would develop up
to 4,781 dwelling units and

7.76 million square feet of nonresidential uses. The Master Plan would add 18,785
residents and 8,670 full-time
jobs at buildout. The Master
Plan’s residential uses would
be well suited for its own
employees, as well as those
from the nearby West
Patterson Business Park and
Arambel Business Park, which
would facilitate jobs-housing
balance.

Policy LU1.10Fiscal impact of new
development. The City shall
use a fiscal impact model to
inform decisions relating to
new major development
projects as defined by
Municipal Code Section

18.08.020 and other new
development as determined by
Consistent: A fiscal impact
analysis was prepared for the
proposed Master Plan in
accordance with the
requirements of Municipal
Code Section 18.08.020.

Consistent: A fiscal impact
analysis was prepared for the
proposed Master Plan in
accordance with the
requirements of Municipal
Code Section 18.08.020.

7.2.c
Packet Pg. 690 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-13
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan the City Council. The purpose
of a fiscal impact analysis is
such and to ensure that the
designation of areas for urban
development and the approval
of development projects do
not hinder efforts to maintain
a positive fiscal balance for the
City.

Policy LU1.11Protect the downtown. The
City shall promote growth that
complements, and does not
adversely compete with, the
downtown.

Consistent: The proposed
Master Plan is located on the
southwest side of Patterson,
more than 2.0 miles from
downtown. The proposed
Maser Plan is entirely
residential and, thus, would
generate new demand for local
retail and restaurants including
those provided by businesses
located downtown.

Consistent: The proposed
Master Plan is located on the
northwest side of Patterson,
with the core area more than

1.7 miles from downtown. The
proposed Master Plan would
have a commercial area
located at Baldwin
Road/Zacharias Road and a
lakeside mixed use activity
area. The former area would
be expected to be a
neighborhood serving retail
center, while the latter area
would be an outdoor ‘lifestyle’
center that would be unique to
Patterson. Both of these
commercial uses would be
complementary to downtown
and therefore, further the
policy of protecting the
downtown area.

Policy LU1.12Status of land prior to urban
development. Land within the
General Plan Area shall
ultimately be developed to
urban standards described in
Part I – Land Use and
Development Standards.

Pending connection to City
services, such land shall
remain in agricultural, open
space, or other low intensity
uses.

Consistent: The proposed
Master Plan would be built in
phases over a 20-year period.

The proposed Master Plan
allows leaving portions of the
project site in agricultural
production until economic
conditions determine that
transition to urban uses is
warranted.

Consistent: The proposed
Master Plan would be built in
phases over a 20-year period.

The proposed Master Plan
allows leaving portions of the
project site in agricultural
production until economic
conditions determine that
transition to urban uses is
warranted.

Policy LU1.15Provision of public services.

Consistent with the policies
and implementation measures
of this General Plan, the City
shall consider the adequacy of
Consistent: This Draft EIR
considers the adequacy of
public services to serve the
proposed Master Plan
consistent with the policies
Consistent: This Draft EIR
considers the adequacy of
public services to serve the
proposed Master Plan
consistent with the policies

7.2.c
Packet Pg. 691 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-14 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan public services prior to
approving new development.
and implementation measures
of the General Plan.
and implementation measures
of the General Plan.

Goal LU-2 To designate adequate land in
a range of residential densities
to address the housing needs
of all income groups expected
to reside in Patterson.

Consistent: The proposed
Master Plan would annex 66
acres of land for residential
development into the
Patterson city limits for the
development of 305 dwelling
units.

Consistent: The proposed
Master Plan would annex
1,186 acres of land for
residential development into
the Patterson city limits for the
development of 4,781 dwelling
units. Housing products would
include low-density, medium
density, and high density
residential.

Policy LU2.1Adequate supply of residential
land. The City shall maintain an
adequate supply of residential
land in appropriate land use
designations and zoning
categories to accommodate
projected household growth,
maintain normal vacancy rates,
and minimize residential land
costs.

Consistent: The proposed
Master Plan would annex 66
acres of land for residential
development into the
Patterson city limits for the
development of 305 dwelling
units.

Consistent: The proposed
Master Plan would annex
1,186 acres of land for
residential development into
the Patterson city limits for the
development of 4,781 dwelling
units.

Policy LU2.2Affordable housing. The City
shall promote the
development of affordable
housing to meet the needs of
low -and moderate-income
households.

Consistent: The proposed
Master Plan would provide
inclusionary affordable housing
or in lieu of fees to the City of
Patterson.

Consistent: The proposed
Master Plan would provide
inclusionary affordable
housing.

Policy LU2.3Neighborhood centers.

Generally, higher density
housing should be located in
areas served by the full range
of urban services, within
walking distance of
neighborhood shopping areas.

Not Applicable: The Baldwin
Master Plan does not propose
high density residential uses.

Consistent: The Zacharias
Master Plan proposed a
lakeside mixed use activity
center where the higher
density residential uses would
be located.

Policy LU2.4Protect existing
neighborhoods. The City shall
promote the preservation of
existing stable residential
neighborhoods
Not Applicable: The Baldwin
Master Plan does not abut any
existing neighborhoods.

Consistent: The Zacharias
Master Plan encompasses the
Ranchette Triangle and abuts
the Patterson Gardens
neighborhood to the south.

The Master Plan does not
propose connections to
existing residential streets
within these areas and, thus,
avoids conflicts associated with
cut-through traffic.

7.2.c
Packet Pg. 692 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-15
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Policy LU2.5Residential development and
public services. The City shall
ensure that new residential
development pays its share in
financing public facilities and
services.

Consistent: The proposed
Master Plan would pay the full
cost of infrastructure
necessary to provide adequate
levels of service delivery.

Consistent: The proposed
Master Plan would pay the full
cost of infrastructure
necessary to provide adequate
levels of service delivery.

Goal LU-3 To designate adequate land
and provide support for the
development of commercial
uses providing goods and
services to Patterson residents
and to become the commercial
service hub for western
Stanislaus County.

Not Applicable: This Master
Plan does not propose any
commercial uses.

Consistent: The proposed
Master Plan contemplates
approximately 350,000 square
feet of commercial uses at the
intersection of Baldwin
Road/Zacharias Road. The
Master Plan would promote
the establishment of Patterson
as the commercial service hub
for western Stanislaus County.

Policy LU3.1Promotion of commercial
sector. The City shall promote,
and assist with the
maintenance and expansion of,
Patterson’s commercial sector
to meet the needs of Patterson
residents, employees, and
visitors. The City shall continue
to gather market information
to inform decisions regarding
efforts to promote local
businesses and attract new
businesses.

Not Applicable: This Master
Plan does not propose any
commercial uses.

Consistent: The proposed
Master Plan contemplates
approximately 350,000 square
feet of commercial uses at the
intersection of Baldwin
Road/Zacharias Road. As such,
the proposed Master Plan
would be well positioned to
meet the needs of local
residents, employees, and
visitors, and attract new
business to the Patterson area.

Policy LU3.2Retail development. The City
shall promote the
establishment, maintenance,
and expansion of businesses in
Patterson that generate high
retail sales taxes as important
contributors to the local
economy.

Not Applicable: This Master
Plan does not propose any
commercial uses.

Consistent: The proposed
Master Plan contemplates a
commercial center at Baldwin
Road/Zacharias Road that
would create jobs and
generate taxable sales.

Policy LU3.3Regional centers. The City shall
encourage regional shopping
malls/centers at sites capable
of support by a full range of
transportation options.

Not Applicable: This Master
Plan does not propose any
commercial uses.

Consistent: The proposed
Master Plan contemplates a
commercial center at Baldwin
Road/Zacharias Road. This
would be an intersection on
the future South County
Corridor.

Goal LU-7 To designate adequate land
and provide support for light
and heavy industrial uses that
Not Applicable: This Master
Plan does not propose any light
industrial uses.

Consistent: The proposed
Master Plan contemplates
approximately 6.9 million

7.2.c
Packet Pg. 693 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-16 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan create jobs and enhance the
economy of Patterson.
square feet of light industrial
uses
Policy LU7.2Location of industrial
development. New industrial
development shall be located
along arterials with easy
freeway or rail access and shall
be served by full City services.

Not Applicable: This Master
Plan does not propose any light
industrial uses.

Consistent: The proposed
master Plan contemplates
approximately 6.9 million
square feet of light industrial
uses. The proposed Master
Plan is immediately adjacent to
Rogers Road and is within 1.5
miles of the I-5/Sperry Avenue
interchange. Additionally, the
light industrial area abuts
Zacharias Road, which is
contemplated to be the
alignment of the future South
County Corridor, which would
have an interchange with I-5.

Policy LU7.5Clean industries. The City shall
promote the development of
clean industries that do not
pose health risks associated
with water and air pollution or
potential leaks or spills.

Not Applicable: This Master
Plan does not propose any light
industrial uses.

Consistent: The proposed
Master Plan contemplates a
wide range of end uses for the
proposed Master Plan,
including research and
development, manufacturing,
software development,
warehouse, and wholesale
distribution. These industries
typically do not use large
quantities of hazardous
materials, which limits the
potential for air and water
pollution and leaks or spills.

Likewise, the proposed Master
Plan prohibits industries such
as chemical/ explosives
manufacturing, refining,
mining, and other uses that are
typically associated with the
use of large quantities of
hazardous materials.

Goal LU-8 To designate adequate land for
development of public and
quasi-public uses to support
existing and new residential,
commercial, and industrial
land uses.

Consistent: The proposed
Master Plan contemplates
parks and trails.

Consistent: The proposed
Master Plan contemplates two
schools, parks, trails, and a
regional dual use flood control
basin/recreation facility.

Goal CD-1 To promote the development
of a coherent and distinctive
physical form and structure
Consistent: The proposed
Master Plan sets forth a
distinctive ‘Modern Mission’
Consistent: The proposed
Master Plan sets forth a
distinctive ‘Modern Mission’

7.2.c
Packet Pg. 694 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-17
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan that reflects Patterson’s smalltown qualities and agricultural heritage.
design theme that incorporates
recognizable local elements,
while also promoting a
contemporary appearance.

This is consistent with the
objective of promoting a
coherent and distinctive
physical form and structure
that reflects Patterson’s smalltown qualities and agricultural heritage.
design theme that incorporates
recognizable local elements,
while also promoting a
contemporary appearance.

This is consistent with the
objective of promoting a
coherent and distinctive
physical form and structure
that reflects Patterson’s smalltown qualities and agricultural heritage.

Policy CD1.1Qualities desired in new
residential neighborhoods. The
qualities desired in residential
expansion areas shall include,
but are not limited, the
following:

A mix of housing products
and densities serving the
broadest range of
households, incomes and
ages;
A neighborhood center
containing higher density
residential development,
retail, restaurants,
entertainment, office, and
public uses within a short
walk or bicycle ride of
surrounding residences;
Parks, schools and other
public/quasi-public uses
within a short walk or
bicycle ride;
A complete and
interconnected system of
mobility consisting of
roadways, bicycle and
pedestrian paths, and transit
stops;
Short blocks with a
substantial tree canopy
shading the street and
sidewalk;
Connectivity to surrounding
neighborhoods, regional
retail centers and
employment;
A sense of personal safety;
Consistent: The proposed
Master Plan provides a mix of
single-family housing products,
parks, trails, and an
interconnected roadway
network.

Consistent: The proposed
Master Plan provides a mix of
single-family and multi-family
housing products, commercial
areas, schools, parks, trails,
and an interconnected
roadway network.

7.2.c
Packet Pg. 695 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-18 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Elements that foster the
sustainable use of scarce or
non-renewable resources;
The appropriate qualities for
a given project will be
determined by the City
Council on a case-by-case
basis consistent with the
policies and implementation
measures of the General
Plan. The City shall continue
to require new development
to incorporate the principles
of ‘Smart Growth,’ including
[Policy CD 1.2]:

Policy CD1.2Enhance distinctiveness. The
City shall endeavor to maintain
and enhance the
distinctiveness and integrity of
neighborhoods and districts in
Patterson.

Consistent: The proposed
Master Plan contemplates a
distinctive ‘Modern Mission’
design theme to link the
residential uses together.

Consistent: The proposed
Master Plan contemplates a
range of uses including a
lakeside mixed use activity
area that would be linked
together by a distinctive
‘Modern Mission’ design
theme.

Policy CD1.3Preserve neighborhood
qualities. The City shall seek to
preserve the vital qualities of
existing, stable residential
neighborhoods and shall
promote the development of
new residential neighborhoods
with these same qualifies.

Not Applicable: The proposed
Baldwin Master Plan does not
abut any existing residential
neighborhoods.

Consistent: The Zacharias
Master Plan encompasses the
Ranchette Triangle and abuts
the Patterson Gardens
neighborhood to the south.

The Master Plan allows the
Ranchette Triangle property
owners to continue existing
land use activities or develop in
accordance with the Master
Plan. Although the Zacharias
Master Plan would not directly
interface with any of the
Patterson Gardens residential
uses, it would reflect the
contemporary character of this
area.

Policy CD1.4Link and define
neighborhoods. The City shall
use the circulation system and
the pedestrian and bicycle
pathway system as important
structural elements to link and
define neighborhoods and
districts in Patterson.

Not Applicable: The Baldwin
Master Plan does not abut any
existing neighborhoods.

Consistent: The Zacharias
Master Plan encompasses the
Ranchette Triangle. The Master
Plan proposes the East-West
Connector to avoid increasing
existing traffic volumes on Ivy
Avenue or Rose Avenue in a
manner that would degrade

7.2.c
Packet Pg. 696 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-19
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan the quality of life in this
neighborhood.

Policy CD1.7Maintain a distinct urban edge.

The City shall seek to maintain
a distinct agricultural definition
to the urban edge of the city as
a means of emphasizing
Patterson’s small-town
qualities and agricultural
heritage.

Consistent: The proposed
Master Plan would provide a
landscaped setback with the
agricultural uses to the south.

Consistent: The proposed
Master Plan would use as
Zacharias Road and SR-33 as
buffers with nearby
agricultural uses.

Goal CD-3 To preserve the existing
community character and
fabric and promote the
development of
neighborhoods and districts
that emphasize pedestrian
convenience.

Consistent: The Master Plan
provides a pedestrian
circulation network consisting
of sidewalks and off-street
paths.

Consistent: The Master Plan
provides a pedestrian
circulation network consisting
of sidewalks and off-street
paths.

Policy CD3.1Respect neighborhood scale
and character. In approving
new or infill development, the
City shall respect existing
neighborhood scale and
character.

Not Applicable: The Baldwin
Master Plan does not abut any
existing neighborhoods.

Consistent: The Zacharias
Master Plan encompasses the
Ranchette Triangle and abuts
the Patterson Gardens
neighborhood to the south.

The Master Plan respects the
existing neighborhood scale
and character by using the
existing PID canal as a buffer
with the Ranchette Triangle
and avoiding a direct interface
with Patterson Canal.

Policy CD3.2Neighborhood design. The City
shall promote the creation of
well-defined residential
neighborhoods in newly
developing areas. Each of
these neighborhoods shall
have a clear focal point, such
as a park, school, or other
open space and community
facility, and shall be designed
to promote pedestrian
convenience. To this end, the
City shall encourage the use of
existing Patterson
neighborhoods, including the
grid street system, as models
for the planning and design of
new residential
neighborhoods.

Consistent: The Master Plan
contemplates a distinctive
entry way on Baldwin Road.

Consistent: The Master Plan
contemplates a distinctive
entry way on Baldwin Road, as
well as at other locations.

7.2.c
Packet Pg. 697 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-20 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Policy CD3.3Pedestrian amenities for
commercial areas. New
commercial and office
development shall promote
pedestrian convenience,
especially in the downtown.

Not Applicable: The Baldwin
Master Plan does not include
commercial uses.

Consistent: The Master Plan
provides a pedestrian
circulation network within the
light industrial and commercial
areas consisting of sidewalks
and off-street paths.

Goal CD-4 To maintain and enhance the
quality of the Patterson’s
landscapes and streetscapes.

Consistent: The proposed
Master Plan contemplates
streetscaping along Baldwin
Road and the internal streets.

Consistent: The proposed
Master Plan contemplates
streetscaping along Baldwin
Road, Zacharias Road, Rogers
Road, the East-West
Connector, and the internal
streets.

Policy CD4.1Street trees. The City shall
endeavor to protect the urban
forest created by mature trees
in existing developed areas
and in newly developing areas.

Consistent: The proposed
Master Plan contemplates
street trees along Baldwin
Road and the internal streets.

Consistent: The proposed
Master Plan contemplates
street trees along Baldwin
Road, Zacharias Road, Rogers
Road, the East-West
Connector, and the internal
streets.

Policy CD4.2Extending the established
pattern of landscaping. The
City shall require that all new
development incorporate the
planting of trees and other
vegetation that extend the
vegetation pattern of older
adjacent neighborhoods into
new development.

Consistent: The proposed
Master Plan contemplates the
continuation of the existing
Baldwin Road streetscape into
the planning area.

Consistent: The proposed
Master Plan contemplates the
continuation of the existing
Baldwin Road and Rogers Road
streetscape into the planning
area.

Policy CD4.3Boulevard planting. The City
shall extend and reinforce
major street tree/boulevard
plantings to enhance the visual
character of special and
important streets within
Patterson.

Consistent: The proposed
Master Plan contemplates the
continuation of the existing
Baldwin Road tree plantings
into the planning area.

Consistent: The proposed
Master Plan contemplates the
continuation of the existing
Baldwin Road and Rogers Road
tree plantings into the planning
area.

Policy CD4.4Landscaped medians. The City
shall identify appropriate
streets for inclusion of
landscaped medians.

Consistent: The proposed
Master Plan contemplates
landscaped medians along all
divided roadways.

Consistent: The proposed
Master Plan contemplates
landscaped medians along all
divided roadways.

Goal 1 It is the Goal of the City of
Patterson to assist in
increasing the availability of
permanent housing for all
community residents.

Consistent: The proposed
Master Plan contemplates up
to 305 permanent dwelling
units.

Consistent: The proposed
Master Plan contemplates up
to 4,781 permanent dwelling
units.

Objective Encourage the development of Consistent: The proposed Consistent: The proposed

7.2.c
Packet Pg. 698 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-21
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan

1.3 housing and programs for all
types of households.

Master Plan contemplates up
to 305 permanent dwelling
units.

Master Plan contemplates up
to 4,781 permanent dwelling
units. Units would include
single-family and multi-family.

Policy 1-3-
8 Encourage the development of
multi-family housing
Not Applicable: The Baldwin
Master Plan does not propose
multi-family housing.

Consistent: The proposed
Master Plan contemplates up
to 548 high density dwelling
units, all of which would be
multi-family.

Objective

1.6 Achieve a jobs/housing
balance.

Consistent: The proposed
Master Plan contemplates up
to 305 dwelling units.

Consistent: The proposed
Master Plan contemplates up
to 4,781 dwelling units
Objective
2-1
Provide the citizens in the City
of Patterson with reasonably
priced housing opportunities,
both purchase and rental,
within the financial capacity of
all.

Consistent: The proposed
Master Plan contemplates up
to 305 dwelling units, thereby
increasing overall supply. This
would contribute to housing
affordability.

Consistent: The proposed
Master Plan contemplates up
to 4,781 dwelling units
including single-family and
multi-family units. This would
increase supply and contribute
to housing affordability.

Policy 2-1-
1 To preserve affordability, allow
and encourage developers to
"piggyback" or file concurrent
applications (i.e., rezones,
tentative tract maps,
conditional use permits,
variance requests, etc.) if
multiple approvals are
required, and if consistent with
applicable processing
requirements.

Consistent: This EIR provides
coverage for the discretionary
actions that would occur with,
the proposed Baldwin Master
Plan including General Plan
Amendment, Pre-zoning, and
tract maps, etc.

Consistent: This EIR provides
coverage for the discretionary
actions that would occur with,
the proposed Zacharias Master
Plan including General Plan
Amendment, Pre-zoning, and
tract maps, use permits, etc.

Goal 3 Provide And Maintain An
Adequate Supply Of Sites For
The Development Of New
Affordable Housing. It is the
goal of the City of Patterson to
provide adequate, suitable
sites for residential use and
development or maintenance
of a range of housing that
varies sufficiently in terms of
cost, design, size, location, and
tenure to meet the housing
needs of all economic
segments of the community at
a level which can be supported
by the infrastructure.

Consistent: The proposed
Master Plan would annex 66
acres of land for residential
development into the
Patterson city limits for the
development of 305 dwelling
units. This would further the
goal of providing adequate,
suitable sites for residential
use.

Consistent: The proposed
Master Plan would annex
1,186 acres of land for
residential development into
the Patterson city limits for the
development of 4,781 dwelling
units. This would further the
goal of providing adequate,
suitable sites for residential
use.

7.2.c
Packet Pg. 699 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-22 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Objective
3-2
Provide opportunities for
mixed-use developments.

Not Applicable: The Baldwin
Master Plan is entirely
residential.

Consistent: The Zacharias
Master Plan includes 27.5
acres of mixed use residential.

Policy 3-2-
1 To ensure the development of
housing that has, to the extent
possible, a support structure of
shopping, services, open
space, and jobs within easy
access.

Consistent: The Master Plan
area would include open
space/parks and is within 1.3
miles of shopping, services,
and jobs.

Consistent: The Master Plan
area would include
employment areas, retail,
mixed use, schools, parks, and
trails.

Objective
3-3
Provide a sufficient amount of
zoned land to accommodate
development for all housing
types and income levels.

Consistent: The proposed
Master Plan would annex 66
acres of land for residential
development into the
Patterson city limits.

Consistent: The proposed
Master Plan would annex
1,186 acres of land for
residential development into
the Patterson city limits.

Goal ED-1 To establish and maintain a
supportive business climate
and a healthy, sustainable
economy.

Consistent: The proposed
Master Plan would add 305
new dwelling units. This would
result in new capital
investment, new housing
opportunities, and new
consumer spending that would
support Patterson’s business
climate and contribute to a
healthy, sustainable economy.

Consistent: The proposed
Master Plan consists of the
development of 4,781 dwelling
units and 7.76 million square
feet of light industrial and
commercial uses. This would
result in new capital
investment, new employment
opportunities, new housing
opportunities, and new
consumer spending that would
support Patterson’s business
climate and contribute to a
healthy, sustainable economy.

Policy ED2.4Quality of life. The City shall
work to improve the quality of
life in Patterson to attract and
retain skilled workers and their
families.

Consistent: The proposed
Master Plan would improve
quality of life by developing
new housing, installing new
infrastructure, and creating
new recreational
opportunities.

Consistent: The proposed
Master Plan would improve
quality of life by developing
new housing, creating new
jobs, building new schools,
installing new infrastructure,
and creating new recreational
opportunities.

Goal ED-3 To promote a diverse and
balanced mix of employment
and housing opportunities.

Consistent: The proposed
Master Plan would annex 66
acres for residential
development. The Master Plan
allows a mix of housing
products. This is consistent
with the goal of promoting a
balanced mix of employment
and housing opportunities.

Consistent: The proposed
Master Plan would annex
1,162 acres for residential and
non-residential development.

The Master Plan allows a mix
of housing products and light
industrial, commercial, schools,
and parks. This is consistent
with the goal of promoting a
balanced mix of employment
and housing opportunities.

7.2.c
Packet Pg. 700 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-23
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Policy ED3.1Jobs-to-housing ratio. The City
shall maintain an adequate
retail, business, and industrial
land supply to meet a jobs-tohousing ratio of at least 1.0.

Consistent: The proposed
Master Plan would annex 66
acres for residential
development. At buildout, the
Master Plan would add 1,203
residents at buildout, thereby
contributing to the adequate
land supply to meet a jobs-tohousing ratio of at least 1.0.

Consistent: The proposed
Master Plan would annex
1,162 acres for residential and
non-residential development.

The Master Plan would add
18,785 residents and 8,670
jobs at buildout, thereby
contributing to the adequate
land supply to meet a jobs-tohousing ratio of at least 1.0.

Policy ED3.3Housing choices. The City shall
provide for and encourage a
range of housing choices—
including live/work units—
through land use designations
and zoning ordinances.

Consistent: The proposed
Master Plan contemplates 305
dwelling units
Consistent: The proposed
Master Plan contemplates
4,781 dwelling units
Goal T-1 To create and maintain a
roadway network that will
ensure the safe and efficient
movement of people and
goods throughout the city.

Consistent: The proposed
Master Plan would construct
new and improve existing
roadway facilities, which would
further the goal of providing for
the safe and efficient movement
of people and goods.

Consistent: The proposed
Master Plan would construct
new and improve existing
roadway facilities, which would
further the goal of providing for
the safe and efficient movement
of people and goods.

Policy T.1-
1 Street design. Street design
and access standards shall
provide for safe and efficient
movement of goods and
people. Restrictive traffic
control measures (such as
channelization, street closures,
and prohibition of some traffic
movements) shall be used
where appropriate to promote
traffic safety and efficient
traffic operation.

Consistent: The new and
improved roadways would
adhere to the City’s street
design standards. All new
roadways within the Master
Plan area provide for direct
and efficient access. In
addition, the proposed Master
Plan would install appropriate
traffic control measures where
appropriate in order to
promote traffic safety and
efficient traffic operations.

Consistent: The new and
improved roadways would
adhere to the City’s street
design standards. All new
roadways within the Master
Plan area provide for direct
and efficient access. In
addition, the proposed Master
Plan would install appropriate
traffic control measures where
appropriate in order to
promote traffic safety and
efficient traffic operations.

Policy T.1-
2 Level of service standard. The
City shall endeavor to maintain
a minimum Level of Service
“D,” as defined by the 2000
Highway Capacity Manual or
subsequent revisions, on all
streets and intersections
within the city. To identify the
potential impacts of new
development on traffic service
levels, the City shall require
the preparation of traffic
Consistent: Advanced Mobility
Group (AMG) prepared a traffic
impact analysis for the
proposed Master Plan. The
study identified feasible traffic
improvements that are
reflected as mitigation
measures in the Draft EIR to
achieve LOS D or better.

Consistent: AMG prepared a
traffic impact analysis for the
proposed Master Plan. The
study identified feasible traffic
improvements that are
reflected as mitigation
measures in the Draft EIR to
achieve LOS D or better.

7.2.c
Packet Pg. 701 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-24 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan impact analyses at the sole
expense of the developer for
developments determined to
be large enough to have
potentially significant traffic
impacts. This standard does
not apply to freeways which
are governed by the standards
established by Caltrans.

Policy T.1-
3 Hierarchy of streets. The City
shall implement a hierarchical
street system in which each
street serves a specific,
primary function and is
sensitive to the context of the
land uses served. The
hierarchy of streets shall be
based on the existing one
square mile backbone grid
system of streets along section
lines and the traditional
circulation pattern established
in the City’s downtown.

Development of residential
neighborhoods within the
backbone grid may employ a
more circuitous street pattern
with cul-de-sacs, traffic circles,
roundabouts and other traffic
calming features to help
reduce traffic speeds.

Consistent: The proposed
Master Plan would include the
construction of a hierarchy of
new and improved roadways.

These roadways have been
designed specifically for the
characteristics of the proposed
Master Plan and would provide
seamless connections to
existing roadways such as
Baldwin Road.

Consistent: The proposed
Master Plan would include the
construction of a hierarchy of
new and improved roadways.

These roadways have been
designed specifically for the
characteristics of the proposed
Master Plan and would provide
seamless connections to
existing roadways such as
Baldwin Road, Zacharias Road,
and Rogers Road.

Policy T1.4City standards for streets.

Streets shall be dedicated,
widened, extended, and
constructed based on the
roadway classifications/
definitions and street sections
provided in the City’s roadway
improvement standards and
Street Master Plan (see
implementation measure T-2).

Dedication and improvements
of full rights-of-way shall not
be required in existing
developed areas where the
City determines that such
improvements are either
infeasible or undesirable.

Other deviations from these
Consistent: The proposed
Master Plan’s roadways would
include streets identified on
the City of Patterson General
Plan’s Circulation Plan. The
roadways would be
constructed according to the
classifications/definitions and
street sections provided in the
City’s roadway improvement
standards.

Consistent: The proposed
Master Plan’s roadways would
include streets identified on
the City of Patterson General
Plan’s Circulation Plan. The
roadways would be
constructed according to the
classifications/definitions and
street sections provided in the
City’s roadway improvement
standards.

7.2.c
Packet Pg. 702 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-25
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan standards shall be permitted
upon a determination by the
City Engineer that safe and
adequate public access and
circulation are preserved by
such deviations.

Policy T1.5Neighborhood streets.

Neighborhood streets shall be
designed, where feasible, to
discourage unsafe traffic
speeds.

Consistent: The proposed
Master Plan’s circulation
system would include features
such as curvilinear alignments
and roundabouts to discourage
unsafe traffic speeds.

Consistent: The proposed
Master Plan’s circulation
system would include features
such as curvilinear alignments
and roundabouts to discourage
unsafe traffic speeds.

Policy T1.6South County Corridor. The
City shall promote efforts of
Stanislaus County, StanCOG
and other stakeholders in the
development of the South
County Corridor to connect W.

Main Avenue to Interstate 5.

The City’s preference for the
alignment of the South County
Corridor is shown on the
Circulation Plan (Figure II-4 of
Chapter II. Land
Use/Circulation Diagrams And
Standards). However, the final
alignment should be decided
through a cooperative effort
among stakeholders, and
informed by a comprehensive
feasibility study that assesses
at least the following:

The appropriate right-of-way
width and location;
Environmental and
regulatory constraints,
especially as they relate to
agricultural and biological
resources;
The need for, and
economic/environmental
feasibility of, constructing a
second bridge over the San
Joaquin River;
An estimate of relevant
costs; and
An analysis of alternatives;
Not Applicable: The proposed
Master Plan does not abut the
planned South County
Corridor.

Consistent: The proposed
Master Plan’s circulation
system has been designed to
accommodate the planned
South County Corridor, thereby
supporting the City’s preferred
alignment and efforts to
connect W. Main Avenue to I5.

7.2.c
Packet Pg. 703 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-26 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Policy T1.8Streets outside the downtown.

The primary purpose of streets
outside the downtown is the
movement of vehicles and
goods; parking shall be a
secondary and subordinate use
only. If travel demands dictate,
on-street parking may be
removed on streets that serve
primarily non-residential
development to increase
traffic-carrying capabilities.

Consistent: The Master Plan
requires each use to provide
sufficient off-street parking in
accordance with Zoning
Ordinance requirements. Onstreet parking would be
prohibited along Baldwin Road.

Consistent: The Master Plan
requires each use to provide
sufficient off-street parking in
accordance with Zoning
Ordinance requirements. Onstreet parking would be
prohibited along major
roadways such as Baldwin
Road, Zacharias Road, and
Rogers Road.

Policy T1.9Truck access to avoid
residential neighborhoods.

Industrial and commercial
development shall be planned
so that truck access through
residential areas is avoided.

Not Applicable: The proposed
Master Plan would be entirely
residential and would not be a
substantial source of truck
traffic.

Consistent: The light industrial
portion of the Master Plan
would be within 1.5 mile from
the I-5/ Sperry Avenue
interchange and the future I5/Zacharias Road (South
County Corridor) interchange.

As such, Master Plan-related
truck traffic would avoid
traveling through residential
areas to reach I-5.

Policy T1.10Funding of traffic
improvements. The City shall
ensure through a combination
of traffic impact fees and other
funding mechanisms that new
development fully mitigates its
impact on traffic facilities by
paying its share of the costs of
circulation improvements.

New development shall pay a
proportional share of costs of
required improvements
necessitated by the new
development.

Consistent: The proposed
Master Plan would mitigate its
impact on traffic facilities by
installing necessary
improvements or paying its
share of the costs of necessary
improvements as determined
in the traffic impact analysis
prepared by AMG. Mitigation
based on this traffic study has
been included in this Draft EIR.

Consistent: The proposed
Master Plan would mitigate its
impact on traffic facilities by
installing necessary
improvements or paying its
share of the costs of necessary
improvements as determined
in the traffic impact analysis
prepared by AMG. Mitigation
based on this traffic study has
been included in this Draft EIR.

Policy T1.11Private streets discouraged.

The City shall discourage the
development of private streets
in new residential projects.

Where private streets are
allowed, they shall be
constructed to City street
standards.

Consistent: The proposed
Master Plan does not
contemplate any private
streets.

Consistent: The proposed
Master Plan does not
contemplate any private
streets.

Policy T1.12Traffic calming encouraged.

Traffic calming techniques,
including roundabouts, traffic
Consistent: The proposed
Master Plan contemplates the
use of roundabouts at
Consistent: The proposed
Master Plan contemplates the
use of roundabouts at

7.2.c
Packet Pg. 704 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-27
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan circles, ‘chokers’ and chicanes,
shall be considered as an
alternative to traditional
intersection controls. Where
cul-de-sacs are employed,
consideration should be given
to establishing connections
between the cul-de-sac and
other streets, parks, bicycle
paths and pedestrian trails.
appropriate locations as well as
the linking of cul-de-sacs with
pedestrian/bicycle
connections.
appropriate locations as well as
the linking of cul-de-sacs with
pedestrian/bicycle
connections.

Policy T1.13New interchange. The City
shall investigate the
construction of a new
interchange at Interstate 5
north of Sperry Avenue near
Zacharias Road.

Consistent: The traffic analysis
considered the need for the
future interchange with I-5 and
identified the timing at which it
would be necessary. This is
consistent with the policy of
investigating the construction
of a new interchange at I-5
north of Sperry Avenue in the
vicinity of Zacharias Road.

Consistent: The proposed
Master Plan has been designed
to accommodate planned
South County Corridor, along a
portion of its northern
boundary. Additionally, the
traffic analysis considered the
need for the future
interchange with I-5 and
identified the timing at which it
would be necessary. This is
consistent with the policy of
investigating the construction
of a new interchange at I-5
north of Sperry Avenue in the
vicinity of Zacharias Road.

Policy T1.14Protection of Neighborhoods.

The City shall ensure to the
extent feasible that pedestrian,
bicycle, and automobile
connections are maintained in
existing neighborhoods
affected by transportation and
other development projects.

Not Applicable: The Baldwin
Master Plan does not abut any
existing neighborhoods and
would not affect circulation
patterns within these areas.

Consistent: The Zacharias
Master Plan encompasses the
Ranchette Triangle and abuts
the Patterson Gardens
neighborhood to the south.

The Master Plan does not
propose connections to
existing residential streets
within these areas and, thus,
would not affect circulation
patterns within these areas.

Goal T-4 To consider air quality and
noise impacts along with traffic
flow efficiency when making
decisions about improvements
to existing roadways or the
construction of new roadways.

Consistent: This EIR has
considered air quality and
noise impacts along with traffic
flow efficiency and mitigation
has been incorporated where
appropriate.

Consistent: This EIR has
considered air quality and
noise impacts along with traffic
flow efficiency and mitigation
has been incorporated where
appropriate.

Policy T4.1Protection of neighborhoods
from traffic impacts. To the
extent feasible, the City shall
provide for separation of
residential and other noiseNot Applicable: The Baldwin Master Plan does not abut any
existing neighborhoods and
would not affect circulation
patterns within these areas.

Consistent: The Zacharias
Master Plan encompasses the
Ranchette Triangle and abuts
the Patterson Gardens
neighborhood to the south.

7.2.c
Packet Pg. 705 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-28 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan sensitive land uses from major
roadways to reduce noise and
air pollution impacts from
traffic.

The Master Plan does not
propose connections to
existing residential streets
within these areas and, thus,
would not affect circulation
patterns within these areas.

Goal T-5 To promote intergovernmental
communication and
cooperation concerning
transportation-related issues.

Consistent: Relevant state and
local agencies that oversee
transportation-related issues
have been provided notice of
the availability of this EIR. The
comments of those agencies
will be addressed in the Final
EIR. This is consistent with
promoting communication and
cooperation among agencies
that oversee transportationrelated issues.

Consistent: Relevant state and
local agencies that oversee
transportation-related issues
have been provided notice of
the availability of this EIR. The
comments of those agencies
will be addressed in the Final
EIR. This is consistent with
promoting communication and
cooperation among agencies
that oversee transportationrelated issues.

Goal 6 To ensure the adequate
provision of both on- and offstreet parking.

Consistent: The proposed
Master Plan requires each use
to provide sufficient off-street
parking in accordance with
Zoning Ordinance
requirements.

Consistent: The proposed
Master Plan requires each use
to provide sufficient off-street
parking in accordance with
Zoning Ordinance
requirements.

Policy T6.2Off-street parking required.

The City shall require provision
of adequate off-street parking
in conjunction with all new
developments. Parking shall be
located convenient to new
development and shall be
easily accessible from the
street system. The adequacy
and appropriateness of parking
requirements in the Zoning
Ordinance shall be periodically
reevaluated.

Consistent: The proposed
Master Plan requires each use
to provide sufficient off-street
parking in accordance with
Zoning Ordinance
requirements.

Consistent: The proposed
Master Plan requires each use
to provide sufficient off-street
parking in accordance with
Zoning Ordinance
requirements.

Goal T-7 To promote pedestrian, bicycle
and rail travel as alternatives
to automobile use.

Consistent: The proposed
Master Plan provides
guidelines for alternative
transportation modes such as
clearly distinguishing walkways
and pedestrian access,
orientating buildings to
respond to pedestrian use, and
implementing pedestrian
linkages between parcels and
buildings. Such amenities
Consistent: The proposed
Master Plan provides
guidelines for alternative
transportation modes such as
clearly distinguishing walkways
and pedestrian access,
orientating buildings to
respond to pedestrian use, and
implementing pedestrian
linkages between parcels and
buildings. Such amenities

7.2.c
Packet Pg. 706 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-29
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan would also serve bicyclists. As
such, pedestrian and bicycle
transit would be promoted.
would also serve bicyclists. As
such, pedestrian and bicycle
transit would be promoted.

Policy T7.1Safe pedestrian and bike
pathways. The City shall create
and maintain a safe and
convenient system of
pedestrian and bicycle
pathways that encourages
walking and bicycling as an
alternative to driving. New
development shall be required
to pay its fair share of the costs
for development of this
pathway system.

Consistent: The proposed
Master Plan provides
guidelines for alternative
transportation modes such as
clearly distinguishing walkways
and pedestrian access,
orientating buildings to
respond to pedestrian use, and
implementing pedestrian
linkages between parcels and
buildings. Such amenities
would also serve bicyclists. As
such, pedestrian and bicycle
transit would be promoted.

Consistent: The proposed
Master Plan provides
guidelines for alternative
transportation modes such as
clearly distinguishing walkways
and pedestrian access,
orientating buildings to
respond to pedestrian use, and
implementing pedestrian
linkages between parcels and
buildings. Such amenities
would also serve bicyclists. As
such, pedestrian and bicycle
transit would be promoted.

Policy T7.2Pedestrian access. All new
development shall be reviewed
to ensure safe pedestrian
access is provided from the
street, within parking areas
and between new
development and surrounding
neighborhoods.

Consistent: The Master Plan
provides guidelines for the
appropriate provision of safe
pedestrian access, including
connection to and from parks.

Consistent: The Master Plan
provides guidelines for the
appropriate provision of safe
pedestrian access, including
connection to and from
commercial areas, schools, and
parks.

Policy T7.3Bike routes. The City shall
establish a safe and convenient
network of identified bicycle
routes connecting new
residential areas by the
shortest possible routes with
recreation, shopping, and
employment areas within the
city. The City shall cooperate
with surrounding jurisdictions
in designing and implementing
an area-wide bikeway system.

Consistent: The Master Plan
sets forth a network of onstreet and off-street bicycle routes that provide direct,
safe, and convenient routes.

Consistent: The Master Plan
sets forth a network of onstreet and off-street bicycle routes that provide direct,
safe, and convenient routes.

Policy T7.4Separation of bike routes from
motor vehicles. Bicycle routes
shall emphasize paths
separated from vehicle traffic
(Class I) to the maximum
extent possible, but shall also
include bicycle lanes within
public streets (Class II and III).

The City shall limit onstreet
bicycle routes to those streets
where the available roadway
Consistent: The Master Plan
sets forth a network of onstreet and off-street bicycle routes.

Consistent: The Master Plan
sets forth a network of onstreet and off-street bicycle routes.

7.2.c
Packet Pg. 707 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-30 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan width and traffic volumes
permit safe coexistence of
bicycle and motor vehicle
traffic.

Policy T7.5Include pathways in open
space. To the extent
practicable, bicycle and
pedestrian pathways shall be
included within open space
areas.

Consistent: The Master Plan
sets forth a network of offstreet bicycle/pedestrian paths that would include alignments
within open space areas.

Consistent: The Master Plan
sets forth a network of offstreet bicycle/pedestrian paths that would include alignments
within open space areas.

Policy T7.6Bike storage. The City shall
require the inclusion of bicycle
parking facilities at all new
major public facilities and
commercial and employment
sites and shall encourage large
employers to provide showers
for employees.

Not Applicable: The Master
Plan is entirely residential.

Consistent: The proposed
Master Plan’s commercial and
mixed uses would be required
to provide bicycle storage
facilities. Certain project uses
may provide on-site locker
room/shower facilities for
employees.

Policy T7.8Bike safety. Bicycle safety shall
be considered when
implementing improvements
for automobile traffic
operations.

Consistent: The proposed
Master Plan’s roadways would
be constructed according to
standards set by the City of
Patterson, including those
related to bicycle safety.

Consistent: The proposed
Master Plan’s roadways would
be constructed according to
standards set by the City of
Patterson, including those
related to bicycle safety.

Goal PS-1 To maintain an adequate level
of service in the City’s water
system to meet the needs of
existing and future
development.

Policy PS1.3Supply for new development.

The City shall not approve any
new development without the
demonstrated assurance of an
adequate water supply to
support such development
that meets City criteria for
both potable and non-potable
demands, and a City-approved
funding mechanism to pay for
necessary improvements. Such
assurance shall be provided in
a form and manner
determined by the City, and
may include, but is not limited
to, the following:
a. A contract between the
property owner(s) and a
Consistent: A Water Supply
Assessment was prepared that
determined that the City would
have adequate long-term
water supply to serve the
Master Plan area.

Consistent: A Water Supply
Assessment was prepared that
determined that the City would
have adequate long-term
water supply to serve the
Master Plan area.

7.2.c
Packet Pg. 708 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-31
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan water purveyor
guaranteeing the longterm delivery of a suitable
quantity of water to serve
the intended use of the
property consistent with
the General Plan;
b. A contract between a
water purveyor and the
City guaranteeing the longterm delivery of a suitable
quantity of water to serve
the intended use of the
property consistent with
the General Plan;
c. Such other mechanism
suitable to the City.

Goal PS-2 To maintain an adequate level
of service in the City’s
wastewater collection and
disposal system to meet the
needs of existing and future
development.

Consistent: A Sanitary Sewer
Analysis concluded that
adequate transmission
capacity exists to handle
effluent from the Master Plan
area. Buildout of the Master
Plan would contribute to the
need for additional wastewater
treatment capacity as phases
are built out. The applicant
would contribute “fair share”
fees to the City of Patterson to
fund the eventual expansion,
thereby ensuring adequate
levels of wastewater collection
and disposal are maintained.

Consistent: A Sanitary Sewer
Analysis concluded that
adequate transmission
capacity exists to handle
effluent from the Master Plan
area. Buildout of the Master
Plan would contribute to the
need for additional wastewater
treatment capacity as phases
are built out. The applicant
would contribute “fair share”
fees to the City of Patterson to
fund the eventual expansion,
thereby ensuring adequate
levels of wastewater collection
and disposal are maintained.

Policy PS2.2Provision of sewer service. The
City shall ensure the provision
of adequate sewer service to
all new development in the
city and support the extension
of sewer service to existing
developed areas where this
service is lacking.

Consistent: The Master Plan
contemplates the development
of a sewer collection system
that would connect to the
City’s municipal system. The
applicant would be responsible
for installation of necessary
infrastructure.

Consistent: The Master Plan
contemplates the development
of a sewer collection system
that would connect to the
City’s municipal system. The
applicant would be responsible
for installation of necessary
infrastructure.

Goal PS-3 To maintain an adequate level of
service in the City’s storm
drainage system to
accommodate runoff from
existing and future development
and to prevent property damage
due to flooding.

Consistent: The Master Plan
contemplates the development
of a storm drainage system that
would manage storm water
runoff to prevent flooding.

Consistent: The Master Plan
contemplates the development
of a storm drainage system that
would manage storm water
runoff to prevent flooding.

Additionally, the Master Plan
contemplates a flood control

7.2.c
Packet Pg. 709 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-32 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan basin that would capture excess
flood flows from Del Puerto
Creek and prevent inundation of
the City.

Policy PS3.2Expansion of drainage systems.

The City shall expand and
develop storm drainage
facilities to accommodate the
needs of existing and planned
development.

Consistent: The Master Plan
contemplates the development
of a storm drainage system
that would connect to the
municipal system. The
applicant would be responsible
for installation of necessary
infrastructure.

Consistent: The Master Plan
contemplates the development
of a storm drainage system
that would be designed to
promote percolation into the
aquifer. The applicant would
be responsible for installation
of necessary infrastructure.

Policy PS3.5Pollutant requirements. Future
drainage system discharges
shall comply with applicable
state and federal pollutant
discharge requirements.

Consistent: The Master Plan’s
storm drainage system
incorporates Low Impact
Development water quality
treatment concepts such as
bioretention basins consistent
with Regional Water Quality
Control Board requirements.

Consistent: The Master Plan’s
storm drainage system
incorporates Low Impact
Development water quality
treatment concepts such as
bioretention basins consistent
with Regional Water Quality
Control Board requirements.

Policy PS3.6National Flood Insurance
Program. The City shall
continue to participate in the
National Flood Insurance
Program. To this end, the City
shall ensure that its regulations
are in full compliance with
standards adopted by the
Federal Emergency
Management Agency.

Not Applicable: The Baldwin
Master Plan area is not located
within a 100-year flood hazard
area.

Consistent: The Master Plan
contemplates the development
of a flood control basin that
would capture excess flood
flows from Del Puerto Creek
and prevent inundation of the
Master Plan areas and other
portions of the City of
Patterson. Once built, the City
file an application for a Letter
of Map Revision with FEMA
that would remove the Master
Plan area from a 100-year
flood hazard area and, thus,
obviate the need for flood
insurance.

Policy PS3.10Storm drainage improvements
required. Construction of
storm drainage improvements
shall be required, as
appropriate, to prevent
flooding during periods of
heavy rainfall. Where feasible,
storm drainage facilities should
continue to be combined with
park facilities.

Consistent: The applicant
would be responsible for
installation of necessary storm
drainage infrastructure prior to
occupancy. Where
appropriate, the Master Plan’s
storm drainage system’s basins
would be available for park and
recreation use during the dry
season.

Consistent: The applicant
would be responsible for
installation of necessary storm
drainage infrastructure prior to
occupancy. Where
appropriate, the Master Plan’s
storm drainage system’s basins
would be available for park and
recreation use during the dry
season. The flood control basin
is planned to be a dual use
facility with athletic fields.

7.2.c
Packet Pg. 710 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-33
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Policy PS3.14Erosion control. The City shall
require new development to
incorporate erosion control
measures to minimize
sedimentation of streams and
other natural drainage
features.

Consistent: The applicant
would be required to
implement a Storm Water
Pollution Prevent Plan during
construction to prevent
pollution from entering
downstream waterways.

Consistent: The applicant
would be required to
implement a Storm Water
Pollution Prevent Plan during
construction to prevent
pollution from entering
downstream waterways.

Policy PS3.15Groundwater recharge. Where
feasible, storm drainage
facilities shall be designed to
assist with, and complement,
the water supply program in
regards to groundwater
recharge.

Consistent: The Master Plan’s
storm water basins would be
designed to promote
percolation into aquifer to
promote groundwater
recharge.

Consistent: The Master Plan’s
storm water collection system
would pipe runoff to a
percolation basin near Del
Puerto Creek to promote
groundwater recharge.

Goal PS-4 To provide for the efficient
collection and disposal of solid
waste while minimizing
impacts to the physical and
social environment.

Consistent: The Master Plan
area would be served with
curbside solid waste and
recycling service.

Consistent: The Master Plan
area would be served with solid
waste and recycling service.

Additionally, the Master Plan
contemplates centralized solid
waste collection facilities for
commercial and multi-family
areas.

Goal PS-5 To ensure that an adequate
level of police service is
maintained as new
development occurs.

Consistent: The Master Plan
contemplates design features
to deter and prevent crime
such as street lighting,
fencing/walls where
appropriate, and visible public
spaces. Additionally, the
applicant would pay police
development fees as the
project buildout. These
measures would ensure that
the Master Plan furthers the
goal of providing adequate
police service.

Consistent: The Master Plan
contemplates design features
to deter and prevent crime
such as street lighting,
fencing/walls where
appropriate, and visible public
spaces. Additionally, the
applicant would pay police
development fees as the
project buildout. These
measures would ensure that
the Master Plan furthers the
goal of providing adequate
police service.

Goal PS-6 To ensure that an adequate
level of fire service is
maintained as new
development occurs.

Consistent: The entire Master
Plan area is within a 5-minute
or less response time from
Station No. 2. The Master
Plan’s roadways comply with
the Circulation Element design
standards, which reflect Fire
Code requirements.

Additionally, the applicant
would pay fire development
fees as the project buildout.

These measures would ensure
Consistent: The entire Master
Plan area is within a 5-minute
or less response time from
Station No. 2. The Master
Plan’s roadways comply with
the Circulation Element design
standards, which reflect Fire
Code requirements.

Additionally, the applicant
would pay fire development
fees as the project buildout.

These measures would ensure

7.2.c
Packet Pg. 711 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-34 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan that the Master Plan furthers
the goal of providing adequate
fire protection.
that the Master Plan furthers
the goal of providing adequate
fire protection.

Goal PS-7 To provide for the educational
needs of Patterson residents.

Consistent: The applicant
would pay school development
fees as the project buildout,
which would fund the
development of new or
expanded school facilities.

These measures would ensure
that the Master Plan furthers
the goal of providing adequate
educational opportunities.

Consistent: The Master Plan
contemplates a 600-student
elementary school and an 800-
student middle school.

Additionally, certain applicants
would pay school development
fees as the project buildout,
which would fund the
development of new or
expanded school facilities.

These measures would ensure
that the Master Plan furthers
the goal of providing adequate
educational opportunities.

Policy PS7.1School sites. The City shall assist
the Patterson Unified School
District and others in locating
and reserving appropriate sites
for new schools.

Not Applicable: Due to its size
and location, the Baldwin
Master Plan does not propose
any school sites.

Consistent: The Master Plan
contemplates a 600-student
elementary school and an 800-
student middle school. These
facilities reflect input provided
by Patterson Unified School
District (PUSD).

Policy PS7.7School facilities concurrent
with residential development.

The City shall require, to the
extent possible, that new
school facilities are
constructed concurrently with
new residential development.

Not Applicable: Due to its size
and location, the Baldwin
Master Plan does not propose
any school sites.

Consistent: Following
recordation of the final map,
the school sites would be
dedicated to PUSD.

Development of the schools
would be at the discretion of
PUSD; however, it would have
the ability to construct one or
both schools concurrently with
new residential development.

Goal AR-1 To foster effective
communication, cooperation,
and coordination in developing
and operating community and
regional air quality programs.

Consistent: The Master Plan
furthers regional air quality
programs through participation
in the Indirect Source Review
program, provision of
landscaped areas, and the
provision of a trail network to
promote use of non-motorized
transportation.

Consistent: The Master Plan
furthers regional air quality
programs through participation
in the Indirect Source Review
program, provision of
landscaped areas, and the
provision of a trail network to
promote use of non-motorized
transportation.

Policy AR1.3CEQA. The City shall use the
CEQA process to identify and
avoid or mitigate potentially
significant air quality impacts
Consistent: This EIR evaluates
the Master Plan’s air quality
impacts and sets forth air
quality mitigation measures
Consistent: This EIR evaluates
the Master Plan’s air quality
impacts and sets forth air
quality mitigation measures

7.2.c
Packet Pg. 712 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-35
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan of new development. The
CEQA process shall be used to
ensure early consultation with
the San Joaquin Valley Unified
Air Pollution Control District
concerning air quality issues
associated with specific
development proposals.
consistent with Air District
guidance.
consistent with Air District
guidance.

Goal AR-2 To reduce the air quality
impacts of motor vehicle use.

Consistent: The Master Plan
contemplates a trail network
to promote use of nonmotorized transportation.

Consistent: The Master Plan
contemplates a trail network
to promote use of nonmotorized transportation.

Goal AR-4 Minimize exposure of the
public to toxic air pollutant
emissions and noxious odors
from industrial, manufacturing,
and processing facilities.

Consistent: The Master Plan is
entirely residential and, thus,
would not be a source of toxic
air pollutant emissions and
noxious odors.

Consistent: The Master Plan’s
light industrial uses would be
located along Rogers Road,
with stormwater basins serving
as a buffer between the
nearest residential area. As
such, truck traffic serving the
light industrial areas would
avoid residential areas and
minimize exposure to toxic air
pollutant emissions and
noxious odors.

Policy AR4.1Sensitive receptors. The City
shall, to the extent practicable,
separate sensitive land uses
from significant sources of air
pollutants or odor emissions.

Sensitive land uses include, but
are not limited to, those that
support people or other
organisms that may have a
significantly increased
sensitivity or exposure to air
pollution by virtue of their age
and health (e.g. schools, day
care centers, hospitals, nursing
homes), status (e.g. sensitive
or endangered species), or
proximity to the source. The
City shall require residential
development projects and
projects categorized as
sensitive receptors to be
located an adequate distance
from existing and potential
sources of toxic emissions such
Consistent: The Master Plan is
entirely residential and, thus,
would not be a source of toxic
air pollutant emissions and
noxious odors.

Consistent: The Master Plan’s
light industrial uses would be
located along Rogers Road,
with stormwater basins serving
as a buffer between the
nearest residential area. As
such, truck traffic serving the
light industrial areas would
avoid residential areas and
minimize exposure to toxic air
pollutant emissions and
noxious odors.

7.2.c
Packet Pg. 713 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-36 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan as freeways, major arterials,
industrial sites, and hazardous
material locations. For
purposes of compliance with
this policy, the City will be
guided by the
recommendations provided in
the Air Quality and Land Use
Handbook: A Community
Health Perspective published
by the California Air Resources
Board.

Goal AR-5 Reduce particulate emissions
from sources under the
jurisdiction of the city.

Consistent: This EIR requires
construction dust abatement
as mitigation. Additionally,
buildout of the Master Plan
would convert an agricultural
area to urban use, which would
significantly reduce windblown
particulate matter. Collectively,
these features further the goal
of reducing particulate matter
emissions.

Consistent: This EIR requires
construction dust abatement
as mitigation. Additionally,
buildout of the Master Plan
would convert an agricultural
area to urban use, which would
significantly reduce windblown
particulate matter. Collectively,
these features further the goal
of reducing particulate matter
emissions.

Goal AR-7 To reduce to the emission of
greenhouse gases and to
promote energy efficiency.

Consistent: This EIR evaluates
the Master Plan’s greenhouse
gas emissions and identifies
reduction measures in
accordance with Air District
guidance.

Consistent: This EIR evaluates
the Master Plan’s greenhouse
gas emissions and identifies
reduction measures in
accordance with Air District
guidance.

Policy AR7.4Greenhouse gas emissions
from new development. The
City shall implement measures
to reduce the emission of
greenhouse gases from new
development. Such measures
may include, but are not
limited to, the following:
a. Discouraging autodependent patterns of
development;
b. Promoting compact, mixeduse, pedestrian-friendly, and transit oriented
development;
c. Promoting energy-efficient
building design and site
planning using either Build It
Green and LEED™ Silver
Consistent: The Master Plan
would develop 305 dwelling
units in proximity to a regional
jobs center. The Master Plan
also contemplates a trail
network that would connect
residential areas to parks to
promote non-motorized
transportation.

Consistent: This Master Plan
includes a mix of land uses
including residential,
commercial, industrial, schools,
and parks. Additionally, the
Master Plan would develop
4,781 dwelling units in
proximity to a regional jobs
center. Finally, the Master Plan
contemplates a trail network
that would connect residential
areas to commercial areas,
schools, and parks to promote
non-motorized transportation.

7.2.c
Packet Pg. 714 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-37
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan standards for residential and
non-residential buildings,
respectively; and
d. Working to improve the
ratio of jobs to housing.

Goal PR-1 To establish and maintain a
public park system and
recreation facilities suited to
the needs of Patterson
residents and visitors.

Consistent: The Master Plan
contemplates the development
of parks and a trail network
and would further the goal of
developing a public park
system and recreation facilities
suited to the needs of
Patterson residents and
visitors.

Consistent: The Master Plan
contemplates the development
of parks, a trail network, and
dual use flood control
basin/regional athletic facility.

As such, the Master Plan would
further the goal of developing
a public park system and
recreation facilities suited to
the needs of Patterson
residents and visitors.

Policy PR1.3Requirements for development.

New development shall be
required to assist in meeting
the City’s standard of five acres
per 1,000 residents. To this end,
the City shall require all new
development to dedicate land,
dedicate improvements, pay inlieu fees, or a combination of these determined acceptable
by the City, to the maximum
extent authorized by law.

Consistent: The Master Plan
contemplates 305 dwelling
units and, thus, would add
1,203 residents. As such, it
would create a demand for 6
acres of parks/recreational
facilities. The Master Plan
proposes the development of 5
acres of parks/recreational
facilities on-site. The applicant
would provide in lieu fees to
the City for the development
of parkland elsewhere.

Consistent: The Master Plan
contemplates 4,781 dwelling
units and, thus, would add
18,785 residents. As such, it
would create a demand for 94
acres of parks/recreational
facilities. The Master Plan
proposes the development of
57 acres of parks/recreational
facilities on-site and the
approximately 40-acre dual use
flood control/athletic facility. If
necessary, the applicants
would provide in lieu fees to
the City for the development
of parkland elsewhere.

Policy PR1.7Joint-use. The City shall pursue
and maintain agreements for
joint-use of school facilities as
a high priority for the
development of new park and
recreational facilities,
especially for after-school
activities.

Not Applicable: The Baldwin
Master Plan does not propose
any joint use facilities.

Consistent: The proposed
school sites may be available
for public use during nonschool hours. Additionally, the proposed dual use flood
control/athletic facility is
contemplated to interface with
the planned PUSD high school
to the east. As such, this facility
is anticipated to be a joint-use
City/PUSD facility.

7.2.c
Packet Pg. 715 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-38 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Goal PR-4 To preserve and enhance
Patterson’s historical heritage.

Consistent: This EIR evaluates
the Master Plan’s potential
impacts on historic resources
and sets forth air quality
mitigation measures consistent
with State guidance.

Consistent: This EIR evaluates
the Master Plan’s potential
impacts on historic resources
and sets forth air quality
mitigation measures consistent
with State guidance.

Goal PR-5 To protect Patterson’s Native
American heritage.

Consistent: This EIR evaluates
the Master Plan’s potential
impacts on tribal cultural
resources and burial sites and
sets forth air quality mitigation
measures consistent with State
guidance.

Consistent: This EIR evaluates
the Master Plan’s potential
impacts on tribal cultural
resources and burial sites and
sets forth air quality mitigation
measures consistent with State
guidance.

Policy PR5.2Native American consultation
requirements. The City shall
continue to comply with the
requirements Government
Code Sections 65352.3 and
65352.4 which require the City
to consult with Native
American tribes with respect
to the possible preservation of,
or the mitigation of impacts to,
specified Native American
places, features, and objects.

Consistent: The City of
Patterson provided notice
regarding the Master Plan to
local tribes. No requests for
consultation were received.

Consistent: The City of
Patterson provided notice
regarding the Master Plan to
local tribes. No requests for
consultation were received.

Goal PR-6 To protect the area’s
archaeological resources.

Consistent: This EIR evaluates
the Master Plan’s potential
impacts on archaeological
resources and sets forth air
quality mitigation measures
consistent with State guidance.

Consistent: This EIR evaluates
the Master Plan’s potential
impacts on archaeological
resources and sets forth air
quality mitigation measures
consistent with State guidance.

Goal HS-1 To prevent loss of life, injury,
and property damage due to
geologic and seismic hazards.

Consistent: There are no
seismic hazards within the
Master Plan boundaries.

Furthermore, all Master Plan
structures would be required
to comply with the applicable
seismic safety requirements of
the California Building
Standards Code.

Consistent: There are no
seismic hazards within the
Master Plan boundaries.

Furthermore, all Master Plan
structures would be required
to comply with the applicable
seismic safety requirements of
the California Building
Standards Code.

7.2.c
Packet Pg. 716 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-39
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Goal HS-2 To prevent loss of life, injury,
and property damage due to
flooding.

Not Applicable: The Baldwin
Master Plan area is not located
within a 100-year flood hazard
area.

Consistent: The Master Plan
contemplates the development
of a flood control basin that
would capture excess flood
flows from Del Puerto Creek
and prevent inundation of the
Master Plan areas and other
portions of the City of
Patterson.

Policy HS2.5Flood protection for
residences. New residential
development, including mobile
homes, shall be constructed so
that the lowest floor is at least
12 inches above the 100- year
flood level.

Not Applicable: The Baldwin
Master Plan area is not located
within a 100-year flood hazard
area.

Consistent: The Master Plan
contemplates the development
of a flood control basin that
would capture excess flood
flows from Del Puerto Creek
and prevent inundation of the
Master Plan areas and other
portions of the City of
Patterson. Once built, the City
file an application for a Letter
of Map Revision with FEMA
that would remove the Master
Plan area from a 100-year
flood hazard area and, thus,
obviate the need to raise
finished floor elevations.

Policy HS2.6Flood protection for nonresidential development. Nonresidential development shall be anchored and floodproofed to prevent damage
from the 100-year flood or,
alternatively, elevated to at
least 12 inches above the 100-
year flood level.

Not Applicable: The Baldwin
Master Plan area is not located
within a 100-year flood hazard
area.

Consistent: The Master Plan
contemplates the development
of a flood control basin that
would capture excess flood
flows from Del Puerto Creek
and prevent inundation of the
Master Plan areas and other
portions of the City of
Patterson. Once built, the City
file an application for a Letter
of Map Revision with FEMA
that would remove the Master
Plan area from a 100-year
flood hazard area and, thus,
obviate the need to raise
finished floor elevations.

Policy HS2.16Flood hazard mitigation prior
to development. The City shall
not approve new development
in areas subject to a 100-year
flood event, based on Federal
Emergency Management
Agency (FEMA) or on other
Not Applicable: The Baldwin
Master Plan area is not located
within a 100-year flood hazard
area.

Consistent: The Master Plan
contemplates the development
of a flood control basin that
would capture excess flood
flows from Del Puerto Creek
and prevent inundation of the
Master Plan areas and other

7.2.c
Packet Pg. 717 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-40 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan updated mapping acceptable
to the City, unless and until the
flood hazard has been
mitigated, such mitigation may
be accomplished by one, or a
combination of, the following:

Compliance with Title 17 of
the City’s Municipal Code,
Flood Hazard areas.

Installation of flood control
improvements along Del
Puerto Creek and/or Salado
Creek.

Avoidance of flood prone
areas.
portions of the City of
Patterson. Once built, the City
file an application for a Letter
of Map Revision with FEMA
that would remove the Master
Plan area from a 100-year
flood hazard area and, thus,
obviate the need for flood
insurance.

Goal HS-3 To prevent loss of life, injury,
and property damage due to
wildland and structural fires,
explosions and release of
hazardous materials.

Consistent: There are no
wildland areas susceptible to
fires within or adjacent to the
Master Plan boundaries.

Furthermore, all Master Plan
structures would be required
to comply with the applicable
fire protection requirements of
the California Building
Standards Code.

Consistent: There are no
wildland areas susceptible to
fires within or adjacent to the
Master Plan boundaries.

Furthermore, all Master Plan
structures would be required
to comply with the applicable
fire protection requirements of
the California Building
Standards Code.

Goal HS-5 To protect city residents from
the harmful and undesirable
effects of excessive noise
Consistent: This EIR evaluates
the Master Plan’s potential
noise impacts and sets forth air
quality mitigation measures to
reduce noise levels to
acceptable levels.

Consistent: This EIR evaluates
the Master Plan’s potential
noise impacts and sets forth air
quality mitigation measures to
reduce noise levels to
acceptable levels.

Policy HS5.1Noise levels resulting from
non-transportation sources.

New development of noisesensitive uses shall not be
allowed where the noise level
due to nontransportation
noise sources will exceed the
noise level standards of Table
HS-1, as measured
immediately within the
property line of the new
development, unless effective
noise mitigation measures
have been incorporated into
the development design to
achieve the standards
specified in Table HS-1
Consistent: This EIR evaluates
nontransportation noise
sources such as construction
noise and stationary noise and,
as necessary, sets forth air
quality mitigation measures to
reduce noise levels to
acceptable levels.

Consistent: This EIR evaluates
nontransportation noise
sources such as construction
noise and stationary noise and,
as necessary, sets forth air
quality mitigation measures to
reduce noise levels to
acceptable levels.

7.2.c
Packet Pg. 718 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-41
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Policy HS5.2Noise levels resulting from
non-transportation noise
sources. Noise levels resulting
from nontransportation noise
sources shall be mitigated so
as not to exceed the noise
level standards of Table HS-1
as measured immediately
within the property line of
lands designated for noisesensitive uses. This policy does not apply to noise sources
associated with agricultural
operations on lands zoned for
agricultural uses.

Consistent: This EIR uses the
noise level standards set forth
in Table HS-1 as the basis for
assessing the significance of
noise impacts.

Consistent: This EIR uses the
noise level standards set forth
in Table HS-1 as the basis for
assessing the significance of
noise impacts.

Policy HS5.3Acoustical analysis required.

Where proposed
nonresidential land uses are
likely to produce noise levels
exceeding the performance
standards of Table HS-1 at
existing or planned noisesensitive uses, an acoustical analysis shall be required as
part of the environmental
review process so that noise
mitigation may be included in
the project design.
(Requirements for the content
of an acoustical analysis are
identified in Table HS-2.)
Consistent: Although the
Baldwin Master Plan is entirely
residential, an acoustical
analysis was prepared. Refer to
Section 3.11, Noise.

Consistent: An acoustical
analysis was prepared to
assess the impacts of
nonresidential noise on
residential receptors. Refer to
Section 3.11, Noise.

Policy HS5.5Noise sensitive land uses. New
development of noise-sensitive
land uses shall not be
permitted in areas exposed to
existing or projected levels of
noise from transportation
noise sources which exceed
the levels specified in Table
HS-3, unless the project design
includes effective mitigation
measures to reduce noise in
outdoor activity areas and
interior spaces to the levels
specified in Table HS-1.

Not Applicable: The Baldwin
Master Plan consists of entirely
residential uses.

Consistent: The Zacharias
Master Plan’s nonresidential
uses would not expose
surrounding residential uses to
excessive noise levels. Refer to
Section 3.11, Noise.

Goal HS-6 To prevent crime and promote
the protection of people and
property.

Consistent: The Master Plan
contemplates design features
to deter and prevent crime
Consistent: The Master Plan
contemplates design features
to deter and prevent crime

7.2.c
Packet Pg. 719 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-42 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan such as street lighting,
fencing/walls where
appropriate, and visible public
spaces.
such as street lighting,
fencing/walls where
appropriate, and visible public
spaces.

Policy HS6.2Deterrence through design.

The City shall encourage the
use of physical site planning as
an effective means of
preventing crime. Developers
shall design open spaces,
parking lots, parks, play areas,
and other public spaces so
they can be under continuous
surveillance by residents. To
this end, the Police
Department shall participate in
the development review
process to ensure that crime
prevention considerations are
incorporated in the design of
residential, commercial,
industrial, and public facility
projects.

Consistent: The Master Plan
contemplates design features
to deter and prevent crime
such as street lighting,
fencing/walls where
appropriate, and visible public
spaces. The Police Department
will review neighborhood
designs for crime prevention
considerations as they come in
for review and approval.

Consistent: The Master Plan
contemplates design features
to deter and prevent crime
such as street lighting,
fencing/walls where
appropriate, and visible public
spaces. The Police Department
will review neighborhood
designs for crime prevention
considerations as they come in
for review and approval.

Goal NR-1 To protect and preserve the
quality of water from local
watersheds, groundwater
resources, and water bodies
including creeks, reservoirs,
and the San Joaquin River.

Consistent: The Master Plan’s
storm drainage system
incorporates Low Impact
Development water quality
treatment concepts such as
bioretention basins consistent
with Regional Water Quality
Control Board requirements.

These features would serve to
protect and preserve local
surface and groundwater
resources.

Consistent: The Master Plan’s
storm drainage system
incorporates Low Impact
Development water quality
treatment concepts such as
bioretention basins consistent
with Regional Water Quality
Control Board requirements.

These features would serve to
protect and preserve local
surface and groundwater
resources.

Policy NR1.2Stormwater quality. The City
shall implement measures to
minimize the discharge of
pollutants and sediment into
Salado Creek, Del Puerto Creek
and the San Joaquin River.

Consistent: The Master Plan’s
storm drainage system would
not directly discharge into
Salado Creek, Del Puerto Creek
or the San Joaquin River.

Instead, storm water would be
treated and piped to
percolation basins.

Consistent: The Master Plan’s
storm drainage system would
not directly discharge into
Salado Creek, Del Puerto Creek
or the San Joaquin River.

Instead, storm water would be
treated and piped to
percolation basins.

7.2.c
Packet Pg. 720 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-43
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx General Plan Consistency Determination
Goal/Policy Text Baldwin Master Plan Zacharias Master Plan Policy NR1.7CEQA. The City shall use the
California Environmental
Quality Act (CEQA) process to
identify and avoid (or mitigate)
potential groundwater
pollution problems resulting
from new urban development.

Consistent: This EIR evaluates
impacts on groundwater and
concluded that all Master Plan
impacts were less than
significant and did not require
mitigation.

Consistent: This EIR evaluates
impacts on groundwater and
concluded that all Master Plan
impacts were less than
significant and did not require
mitigation.

Source: City of Patterson 2010. FCS 2020.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is necessary.

Level of Significance After Mitigation
Less than significant impact.

Municipal Code Consistency
Impact LU-3: The Master Plans would not conflict with the Patterson Municipal Code.

Impact Analysis
This impact assesses whether the proposed Master Plans would conflict with the Municipal Code.

Baldwin and Zacharias Master Plans
The proposed Baldwin Master Plan and Zacharias Master Plan each establishes the regulatory framework that would govern buildout. The Master Plans are intended to supplement the General Plan by establishing area-specific development standards and design guidelines that will apply to new development within the plan boundaries. The Master Plans provide specific area-wide development standards which supplement municipal codes, but since the lands would be annexed into the city, Municipal Code requirements would still apply in other respects, where applicable.

The proposed Master Plans would facilitate the orderly and planned development of the proposed land uses within the Master Plan boundaries. The Master Plan requires structures to be developed in accordance with a set of design standards and guidelines to encourage sensitive, integrated, innovative and sustainable project designs. In summary, the proposed Master Plans comply with all applicable requirements of the Patterson Municipal Code.

The proposed Master Plans would be incorporated into the Municipal Code and, therefore, represents a self-mitigating aspect of the proposed Master Plan. Because the Master Plans comply

7.2.c
Packet Pg. 721 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-44 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx with all applicable requirements for such land use plan, it would be consistent and compatible with the Municipal Code. Impacts would be less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is necessary.

Level of Significance After Mitigation
Less than significant impact.

LAFCo Consistency
Impact LU-4: The Master Plans would not conflict with LAFCo policies.

Impact Analysis
This impact assesses whether the proposed Master Plans would conflict with LAFCo policies.

Baldwin and Zacharias Master Plans
The proposed Master Plan would require approval from Stanislaus Local Agency Formation Commission (LAFCo) for annexation of the Baldwin and Zacharias Master Plan areas into the Patterson city limits. Pursuant to state law and Stanislaus LAFCo procedures, a city’s corporate limits must be at a minimum co-terminus with its Sphere of Influence. The applicant is seeking to expand the Sphere of Influence in a manner that renders it co-terminus with the city limits contemplated by the annexation.

As such, this EIR will address project consistency with the criteria set forth in California Government Code Section 56668 (also known as the Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000), which establishes factors LAFCo agencies must use in reviewing adjustments to jurisdictional boundaries. Table 3.10-2 provides a consistency analysis with California Government Code Section 56668 for the annexation request.

Table 3.10-2: California Government Code Section 56668 (Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000) Consistency Analysis No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
1 Population and population density; land area and land use; per capita assessed valuation; topography, natural boundaries, and drainage basins; proximity to other
populated areas; the likelihood of significant growth in the area, and in adjacent incorporated and
unincorporated areas, during the next 10 years.

Consistent: The
Master Plan is
contiguous to the
Patterson city limits
on its northern
boundary. The project
site is designated for
residential use by the
Consistent: The
Master Plan is
contiguous to the
Patterson city limits
on its western,
eastern, and southern
boundaries. The
project site is

7.2.c
Packet Pg. 722 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-45
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
City of Patterson
General Plan. The
project site contains
cultivated agricultural
land uses planted as
orchards and row
crops and a single
rural residence. The
Delta-Mendota Canal
forms the western
boundary of the
project site. Tank
Road and the City of
Patterson Corporation
Yard forms the
northern boundary.
designated for
residential use by the
City of Patterson
General Plan. The
project site contains
cultivated agricultural
land uses planted as
orchards and row
crops and rural
residences. Rogers
Road forms the
western boundary.

Zacharias Road forms
the northern
boundary. The
California Northern
Railroad tracks and
Ward Avenue form
the eastern boundary.
2 The need for organized community services; the present cost and adequacy of governmental services and
controls in the area; probable future needs for those
services and controls; probable effect of the proposed
incorporation, formation, annexation, or exclusion and
of alternative courses of action on the cost and
adequacy of services and controls in the area and
adjacent areas. “Services,” as used in this subdivision, refers to governmental services whether or not the
services are services which would be provided by local
agencies subject to this division, and includes the public facilities necessary to provide those services.

Consistent: The
proposed Master Plan
consists of the
development of 305
dwelling units and
associated parks and
infrastructure. Such
uses require urban
levels of public
services, which
currently are not
provided to the
project site. The
project applicant will
be obligated to pay
the full or
proportionate cost of
all infrastructure
improvements
necessary to serve
these proposed uses.

Mitigation included as
a part of this EIR
would ensure
infrastructure
improvements
implemented by the
project applicant are
appropriately
designed or
Consistent: The
proposed Master Plan
consists of the
development of 4,781
dwelling units, 7.76
million square feet of
non-residential uses
and associated parks
and infrastructure.

Such uses require
urban levels of public
services, which
currently are not
provided to the
project site. The
project applicant will
be obligated to pay
the full or
proportionate cost of
all infrastructure
improvements
necessary to serve
these proposed uses.

Mitigation included as
a part of this EIR
would ensure
infrastructure
improvements
implemented by the
project applicant are

7.2.c
Packet Pg. 723 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-46 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
compensated to
maintain service
levels. Refer to
Section 3.15, Public
Services and Utilities
for further discussion.
appropriately
designed or
compensated to
maintain service
levels. Refer to
Section 3.15, Public
Services and Utilities
for further discussion.
3 The effect of the proposed action and of alternative
actions, on adjacent areas, on mutual social and
economic interests, and on the local governmental
structure of the county.

Consistent: The
proposed Master Plan
would facilitate the
development of
higher and better
uses within the
project boundaries.

This would be
expected to yield
economic benefits in
form of new jobs, an
expanded tax base,
and greater economic
activity.

The proposed Master
Plan would further
social interests—
albeit indirectly—
largely as a result of
the economic
benefits. For example,
the economic benefits
(e.g., new jobs and tax
revenues) may yield
advancements in local
health, safety, and
welfare.

In terms of impacts on
the local
governmental
structure of the
County, the primary
change is that project
site would fall under
the jurisdiction of the
City of Patterson. The
project site is
currently within the
City of Patterson
Consistent: The
proposed Master Plan
would facilitate the
development of
higher and better
uses within the
project boundaries.

This would be
expected to yield
economic benefits in
form of new jobs, an
expanded tax base,
and greater economic
activity.

The proposed Master
Plan would further
social interests—
albeit indirectly—
largely as a result of
the economic
benefits. For example,
the economic benefits
(e.g., new jobs and tax
revenues) may yield
advancements in local
health, safety, and
welfare.

In terms of impacts on
the local
governmental
structure of the
County, the primary
change is that project
site would fall under
the jurisdiction of the
City of Patterson. The
project site is
currently within the
City of Patterson

7.2.c
Packet Pg. 724 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-47
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
General Plan’s
Planning Area and is
designated for urban
use; thus, it had been
previously
contemplated that
this area would
ultimately join the
City of Patterson at a
future, undetermined
date. As such, this
would not represent a
significant impact on
the local
governmental
structure of the
County.

General Plan’s
Planning Area and is
designated for urban
use; thus, it had been
previously
contemplated that
this area would
ultimately join the
City of Patterson at a
future, undetermined
date. As such, this
would not represent a
significant impact on
the local
governmental
structure of the
County.
4 The conformity of both the proposal and its anticipated effects with both the adopted commission policies on
providing planned, orderly, efficient patterns of urban development, and the policies and priorities set forth in Section 56377. (Section 56377 is reproduced below)
Consistent: The
Master Plan area
contains 61.22 acres
of Prime Farmland
and 0.26 acre of
Farmland of
Statewide
Importance, for a
total of 61.48 acres of
Important Farmland.

Buildout of the
proposed Master Plan
would result in the
conversion of this
farmland acreage to
non-agricultural use.

This conversion would
be consistent with
Section 56377 for the
following reasons:
1) The proposed
Master Plan
contains phasing
provisions that
are intended to
allow for the
logical and
orderly
development of
urban uses within
the project
boundaries.

Consistent: The
Master Plan area
contains 973.01 acres
of Prime Farmland,

60.40 acres of Unique
Farmland, and 151.49
acres of Farmland of
Statewide
Importance, for a
total of 1,184.9 acres
of Important
Farmland. Buildout of
the proposed Master
Plan would result in
the conversion of this
farmland acreage to
non-agricultural use.

This conversion would
be consistent with
Section 56377 for the
following reasons:
1) The proposed
Master Plan
contains phasing
provisions that
are intended to
allow for the
logical and
orderly
development of
urban uses within
the project
56377 In reviewing and approving or
disapproving proposals which
could reasonably be expected to
induce, facilitate, or lead to the
conversion of existing openspace lands to uses other than open-space uses, the
commission shall consider all of
the following policies and
priorities:
(a) Development or use of land
for other than open-space
uses shall be guided away
from existing prime
agricultural lands in openspace use toward areas
containing nonprime
agricultural lands, unless
that action would not
promote the planned,
orderly, efficient
development of an area.
(b) Development of existing
vacant or nonprime
agricultural lands for urban
uses within the existing
jurisdiction of a local agency

7.2.c
Packet Pg. 725 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-48 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
or within the sphere of
influence of a local agency
should be encouraged
before any proposal is
approved which would allow
for or lead to the
development of existing
open-space lands for nonopen-space uses which are
outside of the existing
jurisdiction of the local
agency or outside of the
existing sphere of influence
of the local agency.

Economic
conditions will
dictate the exact
timing and
characteristics of
each phase. As
such, it would be
expected that less
economically
viable agricultural
land would be
developed first
and economically
viable, prime
agricultural land
would be
developed later.
2) The project area
is located
adjacent to the
existing West
Patterson
Business Park to
the east and I-5 to
the west.

Implementation
of the proposed
Master Plan
would annex the
project site into
the City of
Patterson and its
sphere of
influence.

Although the
Master Plan
contains vacant,
nonprime
agricultural lands
that could
support a portion
of the proposed
Master Plan’s
uses. As such,
there are no
existing vacant or
nonprime
agricultural lands
of a similar area
and land use
boundaries.

Economic
conditions will
dictate the exact
timing and
characteristics of
each phase. As
such, it would be
expected that less
economically
viable agricultural
land would be
developed first
and economically
viable, prime
agricultural land
would be
developed later.
2) The project area
is located
adjacent to the
existing West
Patterson
Business Park to
the east and I-5 to
the west.

Implementation
of the proposed
Master Plan
would annex the
project site into
the City of
Patterson and its
sphere of
influence.

Although the
Master Plan
contains vacant,
nonprime
agricultural lands
that could
support a portion
of the proposed
Master Plan’s
uses. As such,
there are no
existing vacant or
nonprime
agricultural lands
of a similar area

7.2.c
Packet Pg. 726 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-49
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
designation
currently
available for
development
within Patterson
that would
accommodate all
of the uses
contemplated by
the proposed
Master Plan. 3)
The project site is
within the City of
Patterson General
Plan Area;
therefore, its
development has
been accounted
and planned for in
the General Plan.
and land use
designation
currently
available for
development
within Patterson
that would
accommodate all
of the uses
contemplated by
the proposed
Master Plan.

Furthermore,
approximately 70
percent of the
West Patterson
Business Park is
developed or
entitled for
development;
therefore, it
reasonable to
expect that
economic factors
would create
demand for
expansion of the
business park.
3) The project site is
within the City of
Patterson General
Plan Area;
therefore, its
development has
been accounted
and planned for in
the General Plan.
5 The effect of the proposal on maintaining the physical and economic integrity of agricultural lands, as defined by Section 56016. (Section 56016 is reproduced below)
Consistent: The
Master Plan area
contains 61.22 acres
of Prime Farmland
and 0.26 acre of
Farmland of
Statewide
Importance, for a
total of 61.48 acres of
Important Farmland.

Consistent: The
Master Plan area
contains 973.01 acres
of Prime Farmland,

60.40 acres of Unique
Farmland, and 151.49
acres of Farmland of
Statewide
Importance, for a
total of 1,184.9 acres
of Important
Farmland.
56016 “Agricultural lands” means land
currently used for the purpose of
producing an agricultural
commodity for commercial
purposes, land left fallow under
a crop rotational program, or
land enrolled in an agricultural
subsidy or set-aside program.

7.2.c
Packet Pg. 727 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-50 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
The Master Plan
contains phasing
provisions that are
intended to allow for
the logical and orderly
development of urban
uses within the
project boundaries.

Economic conditions
will dictate the exact
timing and
characteristics of each
phase. As such, these
phasing provisions
would allow for the
continued use of
agricultural lands until
the point that higher
and better uses are
pursued. This is
consistent with the
objective of
maintaining the
physical and
economic integrity of
agricultural lands.

The Master Plan
contains phasing
provisions that are
intended to allow for
the logical and orderly
development of urban
uses within the
project boundaries.

Economic conditions
will dictate the exact
timing and
characteristics of each
phase. As such, these
phasing provisions
would allow for the
continued use of
agricultural lands until
the point that higher
and better uses are
pursued. This is
consistent with the
objective of
maintaining the
physical and
economic integrity of
agricultural lands.
6 The definiteness and certainty of the
boundaries of the territory, the
nonconformance of proposed boundaries
with lines of assessment or ownership, the
creation of islands or corridors of
unincorporated territory, and other similar
matters affecting the proposed boundaries.

Consistent: The Master Plan
consists of a single parcel
totaling 68.7 gross acres. The
Master Plan area is bounded by
the Delta-Mendota Canal (west),
Tank Road and the City of
Patterson Corporation Yard
(north), and agricultural land
(east and south). The boundaries
follow defined features and
would not create islands or
corridors of unincorporated
territory. As such, annexation of
the project site would be
considered logical and orderly.

Consistent: The
Master Plan consists
of multiple parcels
totaling 1,227.1 gross
acres. The Master
Plan area is bounded
by Rogers Road
(west), Zacharias
Road (north), the
California Northern
Railroad tracks and
Ward Avenue (east)
and the existing
Patterson city limits
(south). The
boundaries follow
defined features and
would not create
islands or corridors of
unincorporated
territory. As such,
annexation of the
project site would be

7.2.c
Packet Pg. 728 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-51
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
considered logical and
orderly.
7 Consistency with city or county general and
specific plans.

Consistent: The proposed
Master Plan is consistent with
the City of Patterson General
Plan. Refer to Impact LU-1.

Consistent: The
proposed Master Plan
is consistent with the
City of Patterson
General Plan. Refer to
Impact LU-1.
8 The sphere of influence of any local agency
which may be applicable to the proposal
being reviewed.

Consistent: The proposed
Master Plan would include the
expansion of the City of
Patterson Sphere of Influence to
include the proposed annexation
area. The Master Plan area is
currently within the City of
Patterson’s General Plan Area.

Consistent: The
proposed Master Plan
would include the
expansion of the City
of Patterson Sphere
of Influence to include
the proposed
annexation area. The
Master Plan area is
currently within the
City of Patterson’s
General Plan Area.
9 The comments of any affected local agency or
other public agency.

Consistent: The Draft EIR will be
circulated to relevant federal,
state, and agencies. Responses
to comments will be provided in
the Final EIR.

Consistent: The Draft
EIR will be circulated
to relevant federal,
state, and agencies.

Responses to
comments will be
provided in the Final
EIR.
10 The ability of the newly formed or receiving entity to provide the services which are the subject of the
application to the area, including the sufficiency of
revenues for those services following the proposed
boundary change.

Consistent: The
Master Plan area will
be served with
municipal services
provided by the City
of Patterson for
fire/emergency
medical services,
police, water, sewer,
and storm drainage.

The Master Plan
describes the service
and infrastructure to
be implemented.

Water, sewer, and
storm drain analysis
have been completed
to ensure the
adequacy of proposed
and existing facilities.

Consistent: The
Master Plan area will
be served with
municipal services
provided by the City
of Patterson for
fire/emergency
medical services,
police, water, sewer,
and storm drainage.

The Master Plan
describes the service
and infrastructure to
be implemented.

Water, sewer, and
storm drain analysis
have been completed
to ensure the
adequacy of proposed
and existing facilities.

7.2.c
Packet Pg. 729 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-52 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
The Draft EIR
addresses impacts to
fire/emergency
medical services and
police and proposed
mitigation as
necessary to ensure
sufficient service
levels are maintained.

Refer to Section 3.13,
Public Services and
Section 3.15, Utilities
for further discussion.

The Draft EIR
addresses impacts to
fire/emergency
medical services and
police and proposed
mitigation as
necessary to ensure
sufficient service
levels are maintained.

Refer to Section 3.13,
Public Services and
Section 3.15, Utilities
for further discussion.
11 Timely availability of water supplies adequate for
projected needs as specified in Section 65352.5. (Section 65352.5 is reproduced below)
Consistent: A Water
Supply Assessment
has been prepared
that indicates longterm water supplies
are available to serve
the proposed Master
Plan. Refer to Section

3.15, Utilities for
further discussion.

Consistent: A Water
Supply Assessment
has been prepared
that indicates longterm water supplies
are available to serve
the proposed Master
Plan. Refer to Section

3.15, Utilities for
further discussion.
65352.5. (a) The Legislature
finds and
declares that it is
vital that there
be close
coordination and
consultation
between
California’s water
supply agencies
and California’s
land use approval
agencies to
ensure that
proper water
supply planning
occurs in order to
accommodate
projects that will
result in
increased
demands on
water supplies.
(b) It is, therefore,
the intent of the
Legislature to
provide a
standardized
process for
determining the
adequacy of
existing and
planned future

7.2.c
Packet Pg. 730 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-53
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
water supplies to
meet existing and
planned future
demands on
these water
supplies.
(c) Upon receiving,
pursuant to
Section 65352,
notification of a
city’s or a
county’s
proposed action
to adopt or
substantially
amend a general
plan, a public
water system, as
defined in
Section 116275
of the Health and
Safety Code, with
3,000 or more
service
connections, shall
provide the
planning agency
with the
following
information, as is
appropriate and
relevant:
(1) The current
version of its
urban water
management
plan, adopted
pursuant to Part

2.6 (commencing
with Section
10610) of
Division 6 of the
Water Code.
(2) The current
version of its
capital
improvement
program or plan,
as reported
pursuant to

7.2.c
Packet Pg. 731 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-54 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
Section 31144.73
of the Water
Code.
(3) A description of
the source or
sources of the
total water
supply currently
available to the
water supplier by
water right or
contract, taking
into account
historical data
concerning wet,
normal, and dry
runoff years.
(4) A description of
the quantity of
surface water
that was
purveyed by the
water supplier in
each of the
previous five
years.
(5) A description of
the quantity of
groundwater that
was purveyed by
the water
supplier in each
of the previous
five years.
(6) A description of
all proposed
additional
sources of water
supplies for the
water supplier,
including the
estimated dates
by which these
additional
sources should
be available and
the quantities of
additional water
supplies that are
being proposed.

7.2.c
Packet Pg. 732 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-55
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
(7) A description of
the total number
of customers
currently served
by the water
supplier, as
identified by the
following
categories and by
the amount of
water served to
each category:
(A) Agricultural
users.
(B) Commercial
users.
(C) Industrial users.
(D) Residential users.
(8) Quantification of
the expected
reduction in total
water demand,
identified by each
customer
category set forth
in paragraph (7),
associated with
future
implementation
of water use
reduction
measures
identified in the
water supplier’s
urban water
management
plan.
(9) Any additional
information that
is relevant to
determining the
adequacy of
existing and
planned future
water supplies to
meet existing and
planned future
demands on
these water
supplies.

7.2.c
Packet Pg. 733 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-56 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
12 The extent to which the proposal will affect a city or cities and the county in achieving their respective fair shares of the regional housing needs as determined by
the appropriate council of governments consistent with
Article 10.6 (commencing with Section 65580) of
Chapter 3 of Division 1 of Title 7. (Section 65580 is
reproduced below.)
Consistent: The City
of Patterson General
Plan designates the
Master Plan as “Low
Density Residential.”
The General Plan
Housing Element
identifies this area as
a potential housing
site for affordable
housing. Therefore,
the proposed Master
Plan would further
the City’s ability to
meet its regional
housing
requirements.

Consistent: The City
of Patterson General
Plan designates the
Master Plan as “Low
Density Residential.”
The General Plan
Housing Element
identifies this area as
a potential housing
site for affordable
housing. Therefore,
the proposed Master
Plan would further
the City’s ability to
meet its regional
housing
requirements.
65580. The Legislature finds and
declares as follows:
(a) The availability of
housing is of vital
statewide importance,
and the early
attainment of decent
housing and a suitable
living environment for
every Californian,
including farmworkers,
is a priority of the
highest order.
(b) The early attainment of
this goal requires the
cooperative
participation of
government and the
private sector in an
effort to expand
housing opportunities
and accommodate the
housing needs of
Californians of all
economic levels.
(c) The provision of
housing affordable to
low- and moderateincome households
requires the
cooperation of all
levels of government.
(d) Local and state
governments have a
responsibility to use
the powers vested in
them to facilitate the
improvement and
development of
housing to make
adequate provision for
the housing needs of

7.2.c
Packet Pg. 734 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-57
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
all economic segments
of the community.
(e) The Legislature
recognizes that in
carrying out this
responsibility, each
local government also
has the responsibility
to consider economic,
environmental, and
fiscal factors and
community goals set
forth in the general
plan and to cooperate
with other local
governments and the
state in addressing
regional housing
needs.
13 Any information or comments from the landowner or
owners, voters, or residents of the affected territory.

Consistent: The
Master Plan is
controlled by one
property owner.

Property owners,
voters, and residents
in the vicinity of the
project site will be
noticed about the
availability of the
CEQA documents and
public meetings.

These individuals will
have the opportunity
to submit comments
to both the City of
Patterson and
Stanislaus LAFCo.

Consistent: The
Master Plan area is
controlled by more
than 30 separate
property owners. The
Master Plan process is
being driven by four
development groups
(Zacharias Ranch, TFP
Development,
Lakeside Hills, and
Keystone Ranch) that
control 1,017 acres of
the 1,227-acre area.

The 143-acre
Ranchette Triangle
contains more than
20 separate property
owners who have not
participated in the
Master Plan process.

The Master Plan
allows these property
owners to continue
existing land use
activities after
annexation into the
City of Patterson.

Property owners,

7.2.c
Packet Pg. 735 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Land Use Draft EIR

3.10-58 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
voters, and residents
in the vicinity of the
project site will be
noticed about the
availability of the
CEQA documents and
public meetings.

These individuals will
have the opportunity
to submit comments
to both the City of
Patterson and
Stanislaus LAFCo.
14 Any information relating to existing land use
designations.

Consistent: The City
of Patterson General
Plan designates the
Master Plan area as
land use as “Low
Density Residential.”
The Stanislaus County
General Plan
designates the project
site as Agriculture.

The Stanislaus County
Zoning Ordinance
designates the project
site as A-2 (General
Agriculture). Note
that the City’s land
use designations
would be legally
binding following
annexation.

Consistent: The City
of Patterson General
Plan designates the
Master Plan area as
land use as “Low
Density Residential.”
The Stanislaus County
General Plan
designates the project
site as Agriculture and
Urban Transition. The
Stanislaus County
Zoning Ordinance
designates the Master
Plan as A-2 (General
Agriculture) and R-A
(Rural Residential).

Note that the City’s
land use designations
would be legally
binding following
annexation.
15 The extent to which the proposal will promote
environmental justice. As used in this subdivision,
“environmental justice” means the fair treatment of
people of all races, cultures, and incomes with respect to the location of public facilities and the provision of public services
Consistent: Although
the proposed Master
Plan does not purport
to alleviate any
alleged environmental
injustices, it would
facilitate the logical
and orderly
development of the
western portion of
the City Patterson,
including creating
new economic
opportunities and
Consistent: Although
the proposed Master
Plan does not purport
to alleviate any
alleged environmental
injustices, it would
facilitate the logical
and orderly
development of the
western portion of
the City Patterson,
including creating
new economic
opportunities and

7.2.c
Packet Pg. 736 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Land Use
FirstCarbon Solutions 3.10-59
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-10 Land Use.docx No. Factor
Consistency Determination
Baldwin Master Plan Zacharias Master Plan
implementing
improvements to
infrastructure (e.g.,
water, sewer, storm
drainage, roadways,
etc.) that advances
the interests of public
health, safety, and
welfare, and the
greater good of the
community. These
characteristics are
consistent with the
objective of fair
treatment of all
people with respect
to the location of
public facilities and
the provision of public
services.
implementing
improvements to
infrastructure (e.g.,
water, sewer, storm
drainage, roadways,
etc.) that advances
the interests of public
health, safety, and
welfare, and the
greater good of the
community. These
characteristics are
consistent with the
objective of fair
treatment of all
people with respect
to the location of
public facilities and
the provision of public
services.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is necessary.

Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 737 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project)

THIS PAGE INTENTIONALLY LEFT BLANK

7.2.c
Packet Pg. 738 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx

3.11 - Noise

3.11.1 - Introduction
This section describes the existing noise setting and potential effects from project implementation on the site and its surrounding area. Descriptions and analysis in this section are based on noise modeling performed by FirstCarbon Solutions (FCS). The noise modeling output is included in this Draft EIR as Appendix G.

3.11.2 - Environmental Setting
Characteristics of Noise
Noise is defined as unwanted sound. Sound becomes unwanted when it interferes with normal activities, when it causes actual physical harm or when it has adverse effects on health. Sound is produced by the vibration of sound pressure waves in the air. Sound pressure levels are used to measure the intensity of sound and are described in terms of decibels. The decibel (dB) is a logarithmic unit, which expresses the ratio of the sound pressure level being measured to a standard reference level. The 0 point on the dB scale is based on the lowest sound level that the healthy, unimpaired human ear can detect. Changes of 3 dB or less are only perceptible in laboratory environments. Audible increases in noise levels generally refer to a change of 3 dB or more, as this level has been found to be barely perceptible to the human ear in outdoor environments. Only audible changes in existing ambient or background noise levels are considered potentially significant.

A-weighted decibels (dBA) approximate the subjective response of the human ear to a broad frequency noise source by discriminating against very low and very high frequencies of the audible spectrum. They are adjusted to reflect only those frequencies that are audible to the human ear.

Because decibels are logarithmic units, they cannot be added or subtracted by ordinary arithmetic means. For example, if one noise source produces a noise level of 70 dB, the addition of another noise source with the same noise level would not produce 140 dB; rather, they would combine to produce a noise level of 73 dB.

Noise Descriptors
There are many ways to rate noise for various time-periods, but an appropriate rating of ambient noise affecting humans also accounts for the annoying effects of sound. Equivalent continuous sound level (Leq) is the total sound energy of time-varying noise over a sample period. However, the predominant rating scales for human communities in the State of California are the Leq and Community Noise Equivalent Level (CNEL) or the day-night average level (Ldn) based on dBA. CNEL is the time-varying noise over a 24-hour period, with a 5 dBA weighting factor applied to the hourly Leq for noises occurring from 7:00 p.m. to 10:00 p.m. (defined as relaxation hours) and a 10 dBA weighting factor applied to noise occurring from 10:00 p.m. to 7:00 a.m. (defined as sleeping hours).

Ldn is similar to the CNEL scale but without the adjustment for events occurring during the evening hours. CNEL and Ldn are within one dBA of each other and are normally exchangeable.

Other noise rating scales of importance when assessing the annoyance factor include the maximum noise level (Lmax), which is the highest exponential time-averaged sound level that occurs during a

7.2.c
Packet Pg. 739 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx stated time-period. The noise environments discussed in this analysis are specified in terms of maximum levels denoted by Lmax for short-term noise impacts. Lmax reflects peak operating conditions and addresses the annoying aspects of intermittent noise.

Noise Propagation
From the noise source to the receiver, noise changes both in level and frequency spectrum. The most obvious is the decrease in noise as the distance from the source increases. The manner in which noise reduces with distance depends on whether the source is a point or line source, as well as ground absorption, atmospheric effects and refraction, and shielding by natural and manmade features. Sound from point sources, such as an air conditioning condenser, a piece of construction equipment, or an idling truck, radiates uniformly outward as it travels away from the source in a spherical pattern.

The attenuation or sound drop-off rate is dependent on the conditions of the land between the noise source and receiver. To account for this ground-effect attenuation (absorption), two types of site conditions are commonly used in noise models: soft-site and hard-site conditions. Soft-site conditions account for the sound propagation loss over natural surfaces such as normal earth and ground vegetation. For point sources, a drop-off rate of 7.5 dBA per each doubling of the distance (dBA/DD) is typically observed over soft ground with landscaping, as compared with a 6 dBA/DD drop-off rate over hard ground such as asphalt, concrete, stone and very hard packed earth. For line sources, such as traffic noise on a roadway, a 4.5 dBA/DD is typically observed for soft-site conditions compared to the 3 dBA/DD drop-off rate for hard-site conditions.

Traffic Noise
The level of traffic noise depends on the three primary factors: (1) the volume of the traffic, (2) the speed of the traffic, and (3) the number of trucks in the flow of traffic. Generally, the loudness of traffic noise is increased by heavier traffic volumes, higher speeds, and greater number of trucks. Vehicle noise is a combination of the noise produced by the engine, exhaust, and tires. Because of the logarithmic nature of noise levels, a doubling of the traffic volume (assuming that the speed and truck mix do not change) results in a noise level increase of 3 dBA. Based on the Federal Highway Administration (FHWA) community noise assessment criteria, this change is “barely perceptible;” for reference, a doubling of perceived noise levels would require an increase of approximately 10 dBA. The truck mix on a given roadway also has an effect on community noise levels. As the number of heavy trucks increases and becomes a larger percentage of the vehicle mix, adjacent noise levels increase.

Stationary Noise
A stationary noise producer is any entity in a fixed location that emits noise. Examples of stationary noise sources include machinery, engines, energy production, and other mechanical or powered equipment and activities such as loading and unloading or public assembly that may occur at commercial, industrial, manufacturing, or institutional facilities. Furthermore, while noise generated by the use of motor vehicles over public roads is preempted from local regulation, although the use of these vehicles is considered a stationary noise source when operated on private property such as at a construction site, a truck terminal, or warehousing facility. The emitted noise from the producer can be mitigated to acceptable levels either at the source or on the adjacent property through the

7.2.c
Packet Pg. 740 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx use of proper planning, setbacks, block walls, acoustic-rated windows, dense landscaping, or by changing the location of the noise producer.

The effects of stationary noise depend on factors such as characteristics of the equipment and operations, distance and pathway between the generator and receptor, and weather. Stationary noise sources may be regulated at the point of manufacture (e.g., equipment or engines), with limitations on the hours of operation, or with provision of intervening structures, barriers or topography.

Construction activities are a common source of stationary noise. Construction-period noise levels are higher than background ambient noise levels but eventually cease once construction is complete.

Construction is performed in discrete steps, each of which has its own mix of equipment and, consequently, its own noise characteristics. These various sequential phases would change the character of the noise generated on each construction site, and therefore, would change the noise levels as construction progresses. Despite the variety in the type and size of construction equipment, similarities in the dominant noise sources and patterns of operation allow construction related noise ranges to be categorized by work phase. Table 3.11-1 shows typical noise levels of construction equipment as measured at a distance of 50 feet from the operating equipment.

Table 3.11-1: Typical Construction Equipment Maximum Noise Levels, Lmax Type of Equipment
Specification Maximum Sound Levels for Analysis (dBA at 50 feet)
Impact Pile Driver 95
Auger Drill Rig 85
Vibratory Pile Driver 95
Jackhammers 85
Pneumatic Tools 85
Pumps 77
Scrapers 85
Cranes 85
Portable Generators 82
Rollers 85
Bulldozers 85
Tractors 84
Front-End Loaders 80
Backhoe 80
Excavators 85
Graders 85
Air Compressors 80

7.2.c
Packet Pg. 741 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Type of Equipment
Specification Maximum Sound Levels for Analysis (dBA at 50 feet)
Dump Truck 84
Concrete Mixer Truck 85
Pickup Truck 55
Source: FHWA 2006. Highway Construction Noise Handbook, August.

Characteristics of Vibration
Groundborne vibrations consist of rapidly fluctuating motions within the ground that have an average motion of zero. The effects of groundborne vibrations typically only cause a nuisance to people, but in extreme cases, excessive groundborne vibration has the potential to cause structural damage to buildings. Although groundborne vibration can be felt outdoors, it is typically only an annoyance to people indoors where the associated effects of the shaking of a building can be notable. Groundborne noise is an effect of groundborne vibration and only exists indoors, since it is produced from noise radiated from the motion of the walls and floors of a room, and may also consist of the rattling of windows or dishes on shelves.

Several different methods are used to quantify vibration amplitude such as the maximum instantaneous peak in the vibrations velocity, which is known as the peak particle velocity (PPV) or the root mean square (rms) amplitude of the vibration velocity. Because of the typically small amplitudes of vibrations, vibration velocity is often expressed in decibels—denoted as LV—and is based on the reference quantity of 1 micro inch per second. To distinguish these vibration levels referenced in decibels from noise levels referenced in decibels, the unit is written as “VdB.” Although groundborne vibration can be felt outdoors, it is typically only an annoyance to people indoors where the associated effects of the shaking of a building can be notable. When assessing annoyance from groundborne vibration, vibration is typically expressed as rms velocity in units of decibels of 1 micro-inch per second, with the unit written in VdB. Typically, developed areas are continuously affected by vibration velocities of 50 VdB or lower. Human perception to vibration starts at levels as low as 67 VdB. Annoyance due to vibration in residential settings starts at approximately 70 VdB.

Off-site sources that may produce perceptible vibrations are usually caused by construction equipment, steel-wheeled trains, and traffic on rough roads, while smooth roads rarely produce perceptible groundborne noise or vibration. Construction activities, such as blasting, pile driving and operating heavy earthmoving equipment, are common sources of groundborne vibration.

Construction vibration impacts on building structures are generally assessed in terms of PPV. Typical vibration source levels from construction equipment are shown in Table 3.11-2.

7.2.c
Packet Pg. 742 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Table 3.11-2: Vibration Levels of Construction Equipment Construction Equipment PPV at 25 Feet (inches/second)
RMS Velocity in Decibels (VdB)
at 25 Feet
Water Trucks 0.001 57
Scraper 0.002 58
Bulldozer—small 0.003 58
Jackhammer 0.035 79
Concrete Mixer 0.046 81
Concrete Pump 0.046 81
Paver 0.046 81
Pickup Truck 0.046 81
Auger Drill Rig 0.051 82
Backhoe 0.051 82
Crane (Mobile) 0.051 82
Excavator 0.051 82
Grader 0.051 82
Loader 0.051 82
Loaded Trucks 0.076 86
Bulldozer—Large 0.089 87
Caisson drilling 0.089 87
Vibratory Roller (small) 0.101 88
Compactor 0.138 90
Clam shovel drop 0.202 94
Vibratory Roller (large) 0.210 94
Pile Driver (impact-typical) 0.644 104
Pile Driver (impact-upper range) 1.518 112
Source: Compilation of scientific and academic literature, generated by FTA and FHWA.

The propagation of groundborne vibration is not as simple to model as airborne noise. This is because noise in the air travels through a relatively uniform medium, while groundborne vibrations travel through the earth, which may contain significant geological differences. Factors that influence groundborne vibration include:

Vibration source: Type of activity or equipment, such as impact or mobile, and depth of vibration source;
Vibration path: Soil type, rock layers, soil layering, depth to water table, and frost depth; and Vibration receiver: Foundation type, building construction, and acoustical absorption.

7.2.c
Packet Pg. 743 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Among these factors that influence groundborne vibration, there are significant differences in the vibration characteristics when the source is underground compared to at the ground surface. In addition, soil conditions are known to have a strong influence on the levels of groundborne vibration. Among the most important factors are the stiffness and internal damping of the soil and the depth to bedrock. Vibration propagation is more efficient in stiff clay soils than in loose sandy soils, and shallow rock seems to concentrate the vibration energy close to the surface, and can result in groundborne vibration problems at large distance from the source. Factors such as layering of the soil and depth to the water table can have significant effects on the propagation of groundborne vibration. Soft, loose, sandy soils tend to attenuate more vibration energy than hard, rocky materials.

Vibration propagation through groundwater is more efficient than through sandy soils. There are three main types of vibration propagation: surface, compression, and shear waves. Surface waves, or Rayleigh waves, travel along the ground’s surface. These waves carry most of their energy along an expanding circular wave front, similar to ripples produced by throwing a rock into a pool of water. Pwaves, or compression waves, are body waves that carry their energy along an expanding spherical wave front. The particle motion in these waves is longitudinal (i.e., in a “push-pull” fashion). P-waves are analogous to airborne sound waves. S-waves, or shear waves, are also body waves that carry energy along an expanding spherical wave front. However, unlike P-waves, the particle motion is transverse, or side-to-side and perpendicular to the direction of propagation.

As vibration waves propagate from a source, the vibration energy decreases in a logarithmic nature and the vibration levels typically decrease by 6 VdB per doubling of the distance from the vibration source. As stated above, this drop-off rate can vary greatly depending on the soil type, but it has been shown to be effective enough for screening purposes, in order to identify potential vibration impacts that may need to be studied through actual field tests. The vibration level (PPV) at a distance from a point source can generally be calculated using the vibration reference equation:

PPV= PPVref * (25/D)^n (in/sec)
Where:

PPVref = reference measurement at 25 feet from vibration source D = distance from equipment to the receptor
n = vibration attenuation rate through ground
According to Chapter 12 of the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment manual (2006), an “n” value of 1.5 is recommended to calculate vibration propagation through typical soil conditions.

Existing Traffic Noise Levels
Existing traffic noise levels along selected roadway segments in the proposed project vicinity were modeled using the FHWA Traffic Noise Prediction Model (FHWA-RD-77-108). Site-specific information is entered, such as roadway traffic volumes, roadway active width, source-to-receiver distances, travel speed, noise source and receiver heights, and the percentages of automobiles, medium trucks, and heavy trucks that the traffic is made up of throughout the day, amongst other variables. The modeled average daily traffic (ADT) volumes were obtained by multiplying the PM

7.2.c
Packet Pg. 744 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx peak-hour intersection traffic volumes from the proposed project-specific traffic study by a factor of ten. The model inputs and outputs, including the 60 dBA, 65 dBA, and 70 dBA CNEL traffic noise contour distances, are provided in Appendix H. A summary of the modeling results is shown in Table

3.11-3.

Table 3.11-3: Existing Traffic Noise Levels
Roadway Segment ADT
Center-line
to 70 CNEL
(feet)
Center-line
to 65 CNEL
(feet)
Center-line
to 60 CNEL
(feet)
CNEL (dBA) 50 feet
from Centerline of
Outermost Lane
Rogers Road - Sperry Avenue to
Keystone Pacific Parkway 5,400 < 50 < 50 < 50 58.0
Rogers Road - Keystone Pacific
Parkway to Zacharias Road 2,100 < 50 < 50 < 50 57.4
Rogers Road - Zacharias Road to
Highway 33 2,000 < 50 < 50 55 59.9
Zacharias Road - Rogers Road to
Baldwin Road 510 < 50 < 50 < 50 54.0
Zacharias Road - Baldwin Road to
Highway 33 820 < 50 < 50 < 50 56.0
Baldwin Road - Zacharias Road to
Highway 33 1,400 < 50 < 50 < 50 58.3
Baldwin Road - Keystone Pacific
Parkway to Zacharias Road 1,800 < 50 < 50 < 50 56.7
Baldwin Road - Sperry Avenue to
Keystone Pacific Parkway 3,400 < 50 < 50 53 58.9
Baldwin Road - south of Sperry
Avenue 1,500 < 50 < 50 < 50 52.5
Highway 33 - Zacharias Road to
Eucalyptus Avenue 8,100 < 50 < 50 92 63.3
Highway 33 - Eucalyptus Avenue to
Ward Avenue 7,900 < 50 < 50 91 63.2
Highway 33 - Ward Avenue to Olive
Avenue 5,900 < 50 < 50 75 61.9
Ward Avenue - south of Highway 33 2,400 < 50 < 50 < 50 54.5 Sperry Avenue - Rogers Road to Park
Center Drive 9,700 < 50 74 157 66.2
Sperry Avenue - Park Center Drive to
Baldwin Road 9,700 < 50 74 157 66.2
Sperry Avenue - Baldwin Road to
American Eagle Avenue 9,600 < 50 64 130 63.9
Sperry Avenue - American Eagle
Avenue to Ward Avenue 11,200 < 50 58 117 63.2
Note:

ADT = Average Daily Traffic
Source: FirstCarbon Solutions 2020.

7.2.c
Packet Pg. 745 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-8 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx The modeling results show that the highest traffic noise levels adjacent to the proposed project site occur along Highway 33 from Zacharias Road to Eucalyptus Avenue, with traffic noise levels ranging up to approximately 63.3 dBA CNEL at the northeastern boundary of the proposed project site.

3.11.3 - Regulatory Framework
Federal
Noise Control Act
The adverse impact of noise was officially recognized by the federal government in the Noise Control Act of 1972, which serves three purposes:

Promulgating noise emission standardsfor interstate commerce Assisting State and local abatement efforts
Promoting noise education and research
The Federal Office of Noise Abatement and Control (ONAC) was initially tasked with implementing the Noise Control Act. However, the ONAC has since been eliminated, leaving the development of federal noise policies and programs to other federal agencies and interagency committees.

Among the agencies now regulating noise are the Occupational Safety and Health Administration (OSHA), which limits noise exposure of workers to 90 dB Leq or less for 8 continuous hours or 105 dB Leq or less for 1 continuous hour; the United States Department of Transportation (USDOT), which assumed a significant role in noise control through its various operating agencies; and the Federal Aviation Administration (FAA), which regulates noise of aircraft and airports. Surface transportation system noise is regulated by a host of agencies, including the FTA. Transit noise is regulated by the federal Urban Mass Transit Administration, while freeways that are part of the interstate highway system are regulated by the FHWA. Finally, the federal government actively advocates that local jurisdictions use their land use regulatory authority to arrange new development in such a way that “noise sensitive” uses are either prohibited from being sited adjacent to a highway, or alternatively, that developments are planned and constructed in such a manner that minimize potential noise impacts.

Since the federal government has preempted the setting of standards for noise levels that can be emitted by transportation sources, local jurisdictions are limited to regulating the noise generated by the transportation system through nuisance abatement ordinances and land use planning.

Federal Transit Administration
The proposed project is not subject to the regulation requirements of the FTA; however, the FTA’s vibration impact criteria are accepted industry-wide as the best vibration impact guidelines when a local governing agency does not have vibration standards of its own.

The FTA has established industry accepted standards for vibration impact criteria and impact assessment. These guidelines are published in its Transit Noise and Vibration Impact Assessment Manual, dated September 2018. The FTA guidelines include thresholds for construction vibration impacts for various structural categories as shown in Table 3.11-4.

7.2.c
Packet Pg. 746 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-9
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Table 3.11-4: Federal Transit Administration Construction Vibration Impact Criteria Building Category PPV (in/sec) Approximate VdB
I. Reinforced-Concrete, Steel or Timber (no plaster) 0.5 102 II. Engineered Concrete and Masonry (no plaster) 0.3 98 III. Non Engineer Timber and Masonry Buildings 0.2 94
IV. Buildings Extremely Susceptible to Vibration Damage 0.12 90 Source: FTA 2018. Transit Noise and Vibration Impact Assessment Manual. September.

State
The State of California has established regulations that help prevent adverse impacts to occupants of buildings located near noise sources. Referred to as the “State Noise Insulation Standard,” it requires buildings to meet performance standards through design and/or building materials that would offset any noise source in the vicinity of the receptor. State regulations include requirements for the construction of new hotels, motels, apartment houses, and dwellings other than detached singlefamily dwellings that are intended to limit the extent of noise transmitted into habitable spaces.

These requirements are found in the California Code of Regulations, Title 24 (known as the Building Standards Administrative Code), Part 2 (known as the California Building Code), Appendix Chapters 12 and 12A. For limiting noise transmitted between adjacent dwelling units, the noise insulation standards specify the extent to which walls, doors, and floor-ceiling assemblies must block or absorb sound. For limiting noise from exterior noise sources, the noise insulation standards set an interior standard of 45 dBA CNEL in any habitable room with all doors and windows closed. In addition, the standards require preparation of an acoustical analysis demonstrating the manner in which dwelling units have been designed to meet this interior standard, where such units are proposed in an area with exterior noise levels greater than 60 dBA CNEL.

Government Code Section 65302 mandates that the legislative body of each county and city in California adopt a noise element as part of its comprehensive general plan. The local noise element must recognize the land use compatibility guidelines published by the State Department of Health Services. These guidelines rank noise and land use compatibility in terms of normally acceptable, conditionally acceptable, normally unacceptable, and clearly unacceptable.

Local
The project site is located within the City of Patterson, in the County of Stanislaus. The City of Patterson addresses noise in the Health and Safety Element of its General Plan, adopted by the City of Patterson in 2010, and in the Noise Control Chapter of its Municipal Code, approved by the City in 2018.

City of Patterson 2010 General Plan
The City of Patterson adopted its General Plan in November of 2010. The objective of the Health and Safety Element’s noise section is to protect City residents from the harmful and undesirable effects of excessive noise. To assist with meeting this objective, the City’s Plan establishes land use noise

7.2.c
Packet Pg. 747 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-10 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx compatibility guidelines for new development and noise performance standards for sensitive land uses affected by transportation and non-transportation noise sources.

The City of Patterson establishes its land use noise compatibility guidelines for new developments in Figure HS-1 of its General Plan (shown in Table 3.11-5 below). Because the proposed project will include the development of various land use types, more than one land use category from this figure is applicable to the proposed project.

The City of Patterson rates land use compatibility in terms of normally acceptable, conditionally acceptable, normally unacceptable, and clearly unacceptable. If noise levels at a project site are within the conditionally acceptable range, new construction or development should be undertaken only after a detailed analysis of the noise reduction requirement is made and needed noise insulation features included in the design. Development of project sites with noise levels in the normally unacceptable range should generally be discouraged. However, if new construction or development does proceed under this scenario, a detailed analysis of the noise reduction requirements must be made with needed noise insulation features included in the design, and outdoor areas must be shielded.

Table 3.11-5: Land Use Noise Compatibility Guidelines for New Development (dBA Ldn or CNEL)
Land Use Category 55 60 65 70 75 80
Residential
Transient Lodging— Motels,
Hotels
Schools, Libraries, Churches,
Hospitals, Nursing Homes
Auditoriums, Concert Halls,
Amphitheaters, Sports Arena
Playgrounds, Neighborhood
Parks

7.2.c
Packet Pg. 748 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-11
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Golf Courses, Riding Stables,
Water Recreation,
Cemeteries
Office Buildings, Businesses,
Commercial and Professional
Industrial, Manufacturing,
Utilities, Agriculture
Source: City of Patterson, 2010
Key:

Normally Acceptable: Specified land use is satisfactory based upon the assumption that any buildings involved are of normal conventional construction, without any special noise insulation requirements.

Conditionally Acceptable: New construction or development should be undertaken only after a detailed analysis of the noise reduction requirements is made and needed noise insulation features included in the design.

Conventional construction, but with closed windows and fresh air supply systems or air conditioning will normally suffice. Outdoor environment will seem noisy.

Normally Unacceptable: New construction and development should generally be discouraged. If new construction or development does proceed, a detailed analysis of the noise reduction requirements must be made with needed noise insulation features included in the design. Outdoor areas must be shielded.

Clearly Unacceptable: New construction or development should generally not be undertaken.

The City establishes noise performance standards for noise-sensitive land uses affected by nontransportation noise sources in Table HS-1 of its General Plan (shown in Table 3.11-6 below).

According to this table and the General Plan’s policies, non-transportation noise sources shall not generate exterior noise in excess of the levels established in Table HS-1 at the property line of any planned or existing noise-sensitive land use.

7.2.c
Packet Pg. 749 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-12 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Table 3.11-6: Noise Level Performance Standards For New Projects Affected By Or Including Non-Transportation Sources
Noise Level
Descriptor
Daytime
(7 a.m. to 10 p.m.)
Nighttime
(10 p.m. to 7 a.m.)
Hourly Leq, Db 50 45
Maximum level, Db 70 65
Each of the noise levels specified above shall be lowered by five dBA for simple tone noises, noises consisting primarily of speech or music, or for recurring impulsive noises. These noise level standards do not apply to residential units established in conjunction with industrial or commercial uses (e.g., caretaker dwellings).

Source: City of Patterson General Plan 2018
Additionally, the City’s General Plan establishes noise performance standards for new or planned noise-sensitive land uses affected by transportation noise sources. According to this standard, new development of noise-sensitive land uses shall not be permitted in areas exposed to existing or projected levels of noise from transportation noise sources which exceed the levels specified in Table HS-3 (shown in Table 3.11-7 below), unless the project design includes effective mitigation measures to reduce noise in outdoor activity areas and interior spaces to the levels specified in Table HS-3.

Table 3.11-7: Noise Level Performance Standards For New Projects Affected By Or Including Transportation Sources
Land Use
Outdoor Activity
Areas1
Interior
Spaces
Ldn/CNEL, Db Leq, Db2
Residential 603 45
Transient Lodging 603 45
Hospitals, Nursing Homes 603 45
Theaters, Auditoriums, Music Halls 35
Churches, Meeting Halls 603 40
Office Buildings 603 45
Schools, Libraries, Museums 45
Playgrounds, Neighborhood Parks 70
1 Where the location of outdoor activity areas is unknown, the exterior noise level standard shall be applied to the property line of the receiving land use.
2 As determined for a typical worst-case hour during periods of use. 3 Where it is not possible to reduce noise in outdoor activity areas to 60 Db Ldn/CNEL or less using a practical application of the best available noise reduction measures, an exterior noise level of up to 65 Db Ldn/CNEL may be allowed, provided that available exterior noise level reduction measures have been implemented and interior noise levels are in compliance with this table.

Source: City of Patterson General Plan 2018.

The Health and Safety Element of the City of Patterson 2010 General Plan contains policies that address noise. The following policies are applicable to the proposed project:

7.2.c
Packet Pg. 750 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-13
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Policies
HS-5.1 Noise levels resulting from non-transportation sources. New development of noise-sensitive uses shall not be allowed where the noise level due to nontransportation noise sources will exceed the noise level standards of Table HS-1, as measured immediately within the property line of the new development, unless effective noise mitigation measures have been incorporated into the development design to achieve the standards specified in Table HS-1.

HS-5.2 Noise levels resulting from non-transportation noise sources. Noise levels resulting from nontransportation noise sources shall be mitigated so as not to exceed the noise level standards of Table HS-1 as measured immediately within the property line of lands designated for noise-sensitive uses. This policy does not apply to noise sources associated with agricultural operations on lands zoned for agricultural uses.

HS-5.4 Noise standards. The feasibility of proposed projects with respect to existing and future transportation noise levels shall be evaluated by comparison to Figure HS-1.

HS-5.5 Noise sensitive land uses. New development of noise-sensitive land uses shall not be permitted in areas exposed to existing or projected levels of noise from transportation noise sources which exceed the levels specified in Table HS-3, unless the project design includes effective mitigation measures to reduce noise in outdoor activity areas and interior spaces to the levels specified in Table HS-1.

HS-5.6 Transportation noise sources and mitigation. Noise created by new transportation noise sources, including roadway improvement projects, shall be mitigated so as not to exceed the levels specified in Table HS-1 at outdoor activity areas or interior spaces of existing noise-sensitive land uses in either the incorporated or unincorporated areas.

HS-5.7 Acoustical analysis required. Where noise-sensitive land uses are proposed in areas exposed to existing or projected exterior noise levels exceeding the levels specified in Table HS-1 or the performance standards of Table HS-3, an acoustical analysis shall be required as part of the environmental review process so that noise mitigation may be included in the project design.

Patterson Municipal Code
The Noise Control Chapter of the Patterson Municipal Code establishes an ordinance for permissible construction hours. This ordinance prohibits any person within a residential zone, or within a radius of five hundred feet therefrom, to operate equipment or perform any outside construction or repair work on buildings, structures, or projects or to operate any pile drive, steam shovel, pneumatic hammer, derrick, steam or electric hoist, or other construction type device between the hours of

7.2.c
Packet Pg. 751 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-14 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx 10:00 p.m. of one day and 7:00 a.m. of the next day in such a manner that a reasonable person of normal sensitiveness residing in the area is caused discomfort or annoyance unless beforehand a special permit authorizing exception to the above hours has been duly obtained from the officer or body of the city having the function to issue permits of this kind.

3.11.4 - Methodology
Traffic Noise Modeling Methodology
The FHWA highway traffic noise prediction model (FHWA RD-77-108) was used to evaluate trafficrelated noise conditions in the vicinity of the proposed project site. Traffic data used in the model was obtained from the Advanced Mobility Group Traffic Impact Study (TIS) prepared for the proposed project. The resultant noise levels were weighed and summed over a 24-hour period in order to determine the CNEL values. The FHWA-RD-77-108 Model arrives at a predicted noise level through a series of adjustments to the Reference Energy Mean Emission Level. Adjustments are then made to the reference energy mean emission level to account for the roadway active width (i.e., the distance between the center of the outermost travel lanes on each side of the roadway); the total ADT; and the percentage of ADT that flows during the day, evening, and night; the travel speed; the vehicle mix on the roadway; a percentage of the volume of automobiles, medium trucks, and heavy trucks; the roadway grade; the angle of view of the observer exposed to the roadway; and the site conditions (“hard” or “soft”) as they relate to the absorption of the ground, pavement, or landscaping.

The level of traffic noise depends on the three primary factors: (1) the volume of the traffic, (2) the speed of the traffic, and (3) the number of trucks in the flow of traffic. Generally, the loudness of traffic noise is increased by heavier traffic volumes, higher speeds, and greater number of trucks.

Vehicle noise is a combination of the noise produced by the engine, exhaust, and tires. Because of the logarithmic nature of traffic noise levels, a doubling of the traffic volume (assuming that the speed and truck mix do not change) results in a noise level increase of 3 dBA. Based on the FHWA community noise assessment criteria, this change is “barely perceptible.” For reference, a doubling of perceived noise levels would require an increase of approximately 10 dBA. The truck mix on a given roadway also has an effect on community noise levels. As the number of heavy trucks increases and becomes a larger percentage of the vehicle mix, adjacent noise levels increase.

The model analyzed the noise impacts from the nearby roadways onto the proposed project vicinity, which consists of the area that has the potential of being impacted from the on-site noise sources as well as the proposed project-generated traffic on the nearby roadways. The roadways were analyzed based on a single-lane-equivalent noise source combining both directions of travel. A single-laneequivalent noise source exists when the vehicular traffic from all lanes is combined into a theoretical single lane that has a width equal to the distance between the two outside lanes of a roadway, which provides almost identical results to analyzing each lane separately where elevation changes are minimal.

7.2.c
Packet Pg. 752 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-15
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx

3.11.5 - Thresholds of Significance
According to Appendix G, Environmental Checklist, of the CEQA Guidelines, noise impacts resulting from the implementation of the proposed project would be considered significant if the proposed project would result in:
a) A significant environmental impact due to a conflict with any applicable land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? b) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
c) Generation of excessive groundborne vibration or groundborne noise levels? d) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
It should be noted that the significance criteria question a), above, is from the Land Use and Planning section of the CEQA Guidelines Appendix G checklist questions. However, this question addresses impacts related to conflicts with land use plans, which would include project-related conflicts to the noise land use compatibility standards of the Noise Element of the General Plan.

Therefore, these impacts are addressed here.

3.11.6 - Project Impacts and Mitigation Measures
This section discusses potential impacts associated with the development of the proposed project and provides mitigation measures where appropriate.

Noise Levels That Would Conflict with Any Land Use Plan, Policy, or Regulation Impact NOI-1: Buildout of the Master Plans may cause a significant environmental impact due to a conflict with any applicable land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.

Impact Analysis
Zacharias and Baldwin Master Plans
A significant impact would occur if implementation of the proposed project would expose the proposed noise sensitive receptors to noise levels in excess of the City’s exterior noise level standards for new land use development. For example, the City considers environments with ambient noise levels of up to 60 dBA CNEL to be “normally acceptable” for new residential land use development, and environments with noise levels above 60 dBA and up to 70 dBA CNEL are considered “conditionally acceptable” for new residential land use development.

The FHWA highway traffic noise prediction model (FHWA RD-77-108) was used to evaluate existing and future project-related traffic noise conditions along modeled roadway segments in the vicinity of the

7.2.c
Packet Pg. 753 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-16 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx proposed project site. The projected future traffic noise levels on roadways adjacent to the site were analyzed to determine compliance with the applicable noise and land use compatibility standards.

Traffic modeling was performed using the data obtained from the proposed project-specific traffic impact study conducted by Advanced Mobility Group. This traffic impact study provides data for existing (2019) and cumulative (2040) conditions. The resultant noise levels were weighed and summed over a 24-hour period to determine the CNEL values. The traffic noise modeling input and output files—including the 60 dBA, 65 dBA, and 70 dBA CNEL noise contour distances—are included in Appendix H. Table 3.11-8 shows a summary of the traffic noise levels for existing (2019), existing plus approved projects, existing plus approved projects plus proposed project, 2040 cumulative no project, 2040 cumulative plus project, and the 2040 cumulative plus project (with new Zacharias Avenue/Interstate 5 [I-5] interchange) conditions, as measured at 50 feet from the centerline of the outermost travel lane.

Table 3.11-8: Project Traffic Noise Level Results
CNEL (dBA) 50 feet from Centerline of Outermost Lane
Existing
Existing Plus
Approved
Projects
Existing
Plus
Approved
Projects
Plus
Proposed
Project
2040
Cumulative
No Project
(dBA) CNEL
2040
Cumulative
Plus Project
(dBA CNEL
2040
Cumulative
Plus Project
(with new
Zacharias
Avenue/I-5
interchange)
(dBA CNEL
Rogers Road - Sperry Avenue
to Keystone Pacific Parkway 58.0 63.5 63.4 60.1 60.7 60.2 Rogers Road - Keystone Pacific
Parkway to Zacharias Road 57.4 65.8 66.2 58.3 60.2 59.1 Rogers Road - Zacharias Road
to Highway 33 59.9 66.4 69.1 60.1 64.4 63.4
Zacharias Road - Rogers Road
to Baldwin Road 54.0 66.8 66.9 56.9 60.3 65.9
Zacharias Road - Baldwin Road
to Highway 33 56.0 67.4 68.8 58.0 65.9 66.1
Baldwin Road - Zacharias Road
to Highway 33 58.3 61.9 69.0 59.4 67.6 65.9
Baldwin Road - Keystone
Pacific Parkway to Zacharias
Road

56.7 59.8 67.9 57.4 65.1 65.0
Baldwin Road - Sperry Avenue
to Keystone Pacific Parkway 58.9 60.6 64.8 60.4 65.3 65.1 Baldwin Road - south of
Sperry Avenue 52.5 54.3 59.1 57.3 60.9 60.6
Highway 33 - Zacharias Road
to Eucalyptus Avenue 63.3 67.8 67.5 63.4 65.3 64.5

7.2.c
Packet Pg. 754 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-17
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx CNEL (dBA) 50 feet from Centerline of Outermost Lane
Existing
Existing Plus
Approved
Projects
Existing
Plus
Approved
Projects
Plus
Proposed
Project
2040
Cumulative
No Project
(dBA) CNEL
2040
Cumulative
Plus Project
(dBA CNEL
2040
Cumulative
Plus Project
(with new
Zacharias
Avenue/I-5
interchange)
(dBA CNEL
Highway 33 - Eucalyptus
Avenue to Ward Avenue 63.2 67.7 67.4 63.3 63.2 62.1
Highway 33 - Ward Avenue to
Olive Avenue 61.9 65.3 65.8 62.5 65.0 65.8
Ward Avenue - south of
Highway 33 54.5 58.7 62.1 54.5 60.6 61.6
Sperry Avenue - Rogers Road
to Park Center Drive 66.2 65.7 66.7 67.6 67.7 67.4
Sperry Avenue - Park Center
Drive to Baldwin Road 66.2 65.5 66.5 66.8 66.7 66.7
Sperry Avenue - Baldwin Road
to American Eagle Avenue 63.9 64.5 66.4 65.2 65.7 65.6
Sperry Avenue - American
Eagle Avenue to Ward Avenue 63.2 63.6 64.4 64.1 64.5 64.4 Notes:
1 Modeling results do not take into account mitigating features such as topography, vegetative screening, fencing, building design, or structure screening. Rather it assumes a worst case of having a direct line of site on flat terrain.

Source: FCS, 2020.

The highest traffic noise levels that would be experienced at the proposed project would occur on Zacharias Road between Baldwin Road and Highway 33 under Existing Plus Approved Projects Plus Proposed Project conditions. These traffic noise levels would range up to approximately 68.8 dBA CNEL as measured at 50 feet from the centerline of the nearest travel lane. Based on the proposed plan development areas, the nearest proposed residential façades could be located approximately 90 feet from the centerline of the roadway. At this distance, traffic noise levels would attenuate to below 64 dBA CNEL. These traffic noise levels are between 60 dBA and 70 dBA CNEL which the City considers to be “conditionally acceptable” for new residential land use developments.

Based on the United States Environmental Protection Agency (EPA) Protective Noise Levels,1a combination of walls, doors, and windows provided in accordance with State building code requirements for the proposed residential development would result in a 25 dBA in exterior-tointerior noise reduction with windows closed and a 15 dBA or more with windows open. With windows open, interior noise levels of the nearest proposed units to Highway 33 would not meet the interior noise standard of 45 dBA Leq (i.e., 64 dBA–15 dBA = 49 dBA). This impact is potentially 1 United States Environmental Protection Agency (EPA) 550/9-79-100, November 1978.

7.2.c
Packet Pg. 755 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-18 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx significant. Therefore, Mitigation Measure (MM) NOI-1 is included, which requires that the proposed project shall include a code compliant mechanical ventilation system that would permit windows to remain closed for prolonged periods. The inclusion of the proposed air conditioning system would allow windows to remain closed and would provide attenuation of up to 25 dBA, which would be sufficient to reduce traffic noise levels to meet the interior noise level standard of 45 dBA Leq (i.e., 64 dBA–25 dBA = 39 dBA). This mitigation measure would ensure that potentially impacted interior residential units would meet the interior noise level requirement of 45 dBA Leq. Therefore, with implementation of MM NOI-1, future projected traffic noise impacts would be reduced to less than significant.

Thus, traffic noise levels adjacent to the proposed project site would not exceed noise levels that the City of Patterson considers acceptable for new residential land uses. As such, traffic noise would result in a less than significant impact for the proposed residential development.

Therefore, the impact related to noise land use compatibility standards consistency would be less than significant.

Level of Significance Before Mitigation
Potentially significant impact.

Mitigation Measures
MM NOI-1 Prior to issuance of residential building permits for the Zacharias Master Plan, the applicant shall submit building plans to the City of Patterson for review and approval that demonstrate that each dwelling unit includes a code compliant mechanical ventilation system that would permit windows to remain closed for prolonged periods for all residential units within 100 feet of Zacharias Road, Baldwin Road, or State Route 33.

Level of Significance After Mitigation
Less than significant impact.

Substantial Noise Increase in Excess of Standards
Impact NOI-2: Buildout of the Master Plans may result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies.

Impact Analysis
This impact assesses construction and operational noise.

Baldwin and Zacharias Master Plans
Construction
A significant impact would occur if construction activities would result in a substantial increase in ambient noise levels outside of the City’s permissible hours for construction that would result in annoyance or sleep disturbance of nearby sensitive receptors.

7.2.c
Packet Pg. 756 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-19
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Noise impacts from construction activities would be a function of the noise generated by construction equipment, equipment location, sensitivity of nearby land uses, and the timing and duration of the construction activities.

Two types of short-term noise impacts would occur during site preparation and project construction.

The first type would result from the increase in traffic flow on local streets, associated with the transport of workers, equipment, and materials to and from the proposed project site. The transport of workers and construction equipment and materials to the proposed project site would incrementally increase noise levels on access roads leading to the site. Because workers and construction equipment would use existing routes, noise from passing trucks would be similar to existing vehicle-generated noise on these local roadways. Typically, a doubling of the average daily trip (ADT) hourly volumes on a roadway segment is required in order to result in an increase of 3 dBA in traffic noise levels; which, as discussed in the characteristics of noise discussion above, is the lowest change that can be perceptible to the human ear in outdoor environments. Project-related construction trips would not be expected to double the hourly traffic volumes along any roadway segment in the proposed project vicinity. For these reasons, short-term intermittent noise from trucks would be minor when averaged over a longer time-period. Therefore, short-term construction-related noise impacts associated with worker commute and equipment transport to the proposed project site would not exceed applicable significance thresholds and would be less than significant.

The second type of short-term noise impact is related to noise generated during site-preparation, grading, and construction activities. Construction is performed in discrete steps, each of which has its own mix of equipment, and consequently, its own noise characteristics. These various sequential phases would change the character of the noise generated on-site. Thus, the noise levels vary as construction progresses through each phase. Despite the variety in the types and sizes of construction equipment, similarities in the dominant noise sources and patterns of operation allow construction noise ranges to be categorized by work phase. Table 3.11-1 shows typical noise levels of construction equipment as measured at a distance of 50 feet from the operating equipment.

The site preparation phase, which includes excavation and grading activities, generate the highest noise levels because the noisiest construction equipment is earthmoving equipment. Earthmoving equipment includes excavating machinery and compacting equipment, such as bulldozers, draglines, backhoes, front loaders, roller compactors, scrapers, and graders. Typical operating cycles for these types of construction equipment may involve 1 or 2 minutes of full power operation followed by 3 or 4 minutes at lower power settings.

The proposed project is expected to require the use of scrapers, bulldozers, water trucks, haul trucks, and pickup trucks. Based on the information provided in Table 3.11-1, the maximum noise level generated by each scraper is assumed to be 85 dBA Lmax at 50 feet from this equipment. Each bulldozer would generate 85 dBA Lmax at 50 feet. The maximum noise level generated by graders is approximately 85 dBA Lmax at 50 feet. Each doubling of sound sources with equal strength increases the noise level by 3 dBA. Assuming that each piece of construction equipment operates at some distance from the other equipment, a reasonable worst-case combined noise level during this phase of construction would be 90 dBA Lmax at a distance of 50 feet from the acoustic center of a construction area. This would result in

7.2.c
Packet Pg. 757 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-20 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx a reasonable worst-case hourly average of 86 dBA Leq. The acoustical center reference is used because construction equipment must operate at some distance from one another on a project site, and the combined noise level as measured at a point equidistant from the sources (acoustic center) would be the worst-case maximum noise level.

The closest noise-sensitive receptors to the proposed Zacharias Master Plan development areas are single-family residences located along the proposed project site’s southern boundary. The closest residence could be located as close as 115 feet from the acoustic center of construction activity where multiple pieces of heavy construction equipment would potentially operate within the plan area. At this distance, worst-case construction noise levels could range up to approximately 83 dBA Lmax, intermittently, and could have an hourly average of up to 79 dBA Leq, at the façade of the nearest single-family residential home. These noise levels would be intermittent and would be reduced at a rate of 6 dB per doubling of distance as equipment moves over the proposed project site further from adjacent sensitive receptors.

The closest noise-sensitive receptors to the proposed Baldwin Master Plan development areas are single-family residences located northeast of the proposed project site’s northern boundary. The closest residence could be located as close as 350 feet from the acoustic center of construction activity where multiple pieces of heavy construction equipment would potentially operate within the plan area. At this distance, worst-case construction noise levels could range up to approximately 83 dBA Lmax, intermittently, and could have an hourly average of up to 69 dBA Leq, at the façade of the nearest single-family residential home. These noise levels would be intermittent and would be reduced at a rate of 6 dB per doubling of distance as equipment moves over the proposed project site further from adjacent sensitive receptors.

Compliance with City’s permissible construction hours would reduce the effects of noise produced by construction activities on longer-term (hourly or daily) ambient noise levels and would reduce potential impacts that could result in annoyance or sleep disturbances at nearby sensitive receptors.

The City of Patterson limits noise-producing construction activities located within five hundred feet of a residential zone to the hours between 7:00 a.m. and 10:00 p.m., daily. Restricting construction activities to these time-periods and implementing the best management noise reduction techniques and practices outlined in MM NOI-2, would ensure that construction noise levels would not result in a substantial temporary increase in ambient noise levels that could result in annoyance or sleep disturbance of nearby sensitive receptors. Therefore, potential short-term construction noise impacts on receptors in project vicinity would be reduced to a less than significant level.

Operation
The proposed project will result in an increase in traffic on local roadway segments in the proposed project vicinity. In addition, implementation of the proposed project would introduce new stationary noise sources to the ambient noise environment in the proposed project vicinity, including parking lot activities and new mechanical ventilation equipment. The potential for a substantial increase in ambient noise levels resulting from these noise sources is analyzed below.

7.2.c
Packet Pg. 758 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-21
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Mobile Source Noise Impacts
The City of Patterson also establishes noise level performance standards for new projects affected by or including transportation sources. The maximum noise threshold for outdoor activity areas is 60 CNEL, and the maximum noise threshold for interior spaces is 45 dBA Leq.

The City of Patterson does not define “substantial increase;” therefore, for purpose of this analysis, a substantial increase is based on the following criteria. As noted in the characteristics of noise discussion, audible increases in noise levels generally refer to a change of 3 dBA or more, as this level has been found to be barely perceptible to the human ear in outdoor environments. A change of 5 dBA is considered the minimum readily perceptible change to the human ear in outdoor environments. Therefore, for purposes of this analysis, a significant impact would occur if the proposed project would cause the CNEL to increase by 5 dBA or greater and thereby cause the CNEL in the proposed project vicinity to exceed conditionally acceptable levels for receiving land uses.

The FHWA highway traffic noise prediction model (FHWA RD-77-108) was used to evaluate existing and future project-related traffic noise conditions along modeled roadway segments in the vicinity of the proposed project site. The projected future traffic noise levels on roadways adjacent to the site were analyzed to determine compliance with the City’s noise and land use compatibility standards. Traffic modeling was performed using the data obtained from the proposed project-specific traffic impact study conducted by Advanced Mobility Group. This traffic impact study provides data for Existing (2019), Existing Plus Approved Projects (2019), Cumulative (2040), and Cumulative (with new Zacharias Avenue/I-5 Interchange) conditions. The resultant noise levels were weighed and summed over a 24- hour period to determine the CNEL values. The traffic noise modeling input and output files—including the 60 dBA, 65 dBA, and 70 dBA CNEL noise contour distances—are included in Appendix H. As shown previously, Table 3.11-8 shows a summary of the traffic noise levels for Existing (2019), Existing Plus Approved Projects, Existing Plus Approved Projects Plus Proposed Project, 2040 Cumulative No Project, 2040 Cumulative Plus Project, the 2040 Cumulative Plus Project (with new Zacharias Avenue/I-5 interchange) conditions, as measured at 50 feet from the centerline of the outermost travel lane.

As shown in Table 3.11-8, the highest traffic noise level increase with implementation of the proposed project would occur along Zacharias Road between Rogers Road and Baldwin Road under 2040 cumulative plus project (with new Zacharias Avenue/I-5 interchange) conditions. Along this roadway segment, the proposed project would result in traffic noise levels ranging up to approximately 63.4 dBA CNEL as measured at 50 feet from the centerline of the nearest travel lane, representing an increase of 9 dBA over 2040 cumulative no project conditions for this roadway segment. However, the resulting traffic noise levels of 63.4 dBA CNEL would still be within the City’s “conditionally acceptable” range for new residential land use developments. Furthermore, none of the modeled roadway segments would experience traffic noise levels that are in excess of the City’s conditionally acceptable land use compatibility standard for residential land uses of 70 dBA CNEL.

Therefore, implementation of the Master Plans would not result in a substantial permanent increase in traffic noise levels that would cause the CNEL to increase by 5 dBA or greater and thereby cause the CNEL in the proposed project vicinity to exceed conditionally acceptable levels for receiving land uses. Thus, traffic noise increase impacts associated with implementation of the Master Plans would be less than significant.

7.2.c
Packet Pg. 759 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-22 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Stationary Operational Noise Impacts
A significant impact would occur if project stationary noise sources would result in a substantial permanent increase in ambient noise levels that would exceed the following thresholds at the property line of any noise-sensitive land use in the proposed project vicinity:
50 dBA Leq or 70 dBA Lmax between the hours of 7:00 a.m. and 10:00 p.m.; or 45 dBA Leq or 65 dBA Lmax between the hours of 10:00 p.m. and 7:00 a.m.

The proposed project would include new stationary noise sources such as parking lot activities and mechanical ventilation system equipment. These would be potential point sources of noise that could affect receptors in the proposed project vicinity.

As described in the characteristics of noise section, as noise spreads from a source, it loses energy so that the farther away the noise receiver is from the noise source, the lower the perceived noise level would be. Geometric spreading causes sound levels to attenuate or be reduced, resulting in a 6-dB reduction in the noise level for each doubling of distance from a single point source of noise to the noise-sensitive receptor of concern. Additionally, if sensitive receptors are shielded from noise by buildings, sound barriers, or other structures, this would provide additional attenuation. The amount of attenuation provided by shielding is a function of the height of the intervening structure and its ability to block the line of site between a noise source and receptor. Therefore, the significance of any potential impact would vary with the distance between proposed stationary noise sources and sensitive receptors and the inclusion of any intervening structures or barriers.

Parking Lot Activities
Proposed medium- and high-density residential land uses would require parking areas for staff, visitors, and persons residing within the plan area. Parking lot activities include vehicles cruising at slow speeds, doors shutting, or cars starting, would generate noise levels of approximately 60 dBA to 70 dBA Lmax at 50 feet. A conversation between two persons at a distance of 3 to 5 feet apart would generate a noise level of 60 dBA Leq at 5 feet, or approximately 40 dBA Leq as measured at 50 feet.

At the time that this analysis was prepared, the location of the proposed parking areas was not identified on the area plan. The closest noise-sensitive receptors to potential areas where parking lots could be developed are single-family residences located within 50-feet of the plan area’s southern boundary. At a distance of 100 feet, parking lot activity intermittent noise levels would attenuate to below the City’s nighttime noise performance standards of 45 dBA Leq or 64 dBA Lmax.

Therefore, proposed parking areas should be located a minimum of 100 feet from existing residential land uses or should provide shielding to block the line of sight to nearby noise sensitive land uses to meet the City’s nighttime noise performance standards. Therefore, with implementation of MM NOI2b parking lot activity associated with the Zacharias Master Plan development would not generate a substantial temporary or permanent increase in excess of the City’s nighttime noise performance standards as measured at the nearest sensitive receptors, and the impact would be reduced to less than significant.

Commercial/Light Industrial Mechanical Ventilation Equipment At the time of preparation of this analysis, details were not available pertaining to proposed mechanical ventilation systems for the proposed project; therefore, a reference noise level for

7.2.c
Packet Pg. 760 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-23
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx typical mechanical ventilation systems was used. Noise levels from typical residential mechanical ventilation equipment are anticipated to range up to approximately 70 dBA Leq at a distance of 3 feet from the operating unit.

Zacharias Master Plan Area
At the time that this analysis was prepared, the location of potential mechanical ventilation systems was not identified on the area plan. The closest noise-sensitive receptors to potential areas where new mechanical equipment could be located are single-family residences located within 50-feet of the plan area’s southern boundary. At a distance of 55 feet, typical residential mechanical ventilation system operation noise levels would attenuate to below the City’s nighttime noise performance standards of 45 dBA Leq or 64 dBA Lmax. Therefore, proposed mechanical ventilation systems should be located a minimum of 55 feet from existing sensitive receptors or should provide shielding to block the line of sight to nearby noise sensitive land uses to meet the City’s nighttime noise performance standards. Therefore, with implementation of MM NOI-2c mechanical ventilation equipment operations associated with the Zacharias Master Plan development would not generate a substantial temporary or permanent increase in excess of the City’s noise standards as measured at the nearest sensitive receptors, and the impact would be reduced to less than significant Baldwin Master Plan Area
At the time that this analysis was prepared, the location of potential mechanical ventilation systems was not identified on the area plan. The closest existing noise-sensitive receptors are single-family residences, located northeast approximately 300 feet from the Baldwin Master Plan nearest potential areas where new mechanical equipment could be located. At this distance, residential mechanical ventilation system noise levels would attenuate to below 30 dBA Leq at the property line of this nearest sensitive receptor. As a result, noise levels from residential mechanical ventilation system operations would not exceed the City’s nighttime noise performance thresholds of 45 Leq or 65 dBA Lmax at the property line of the nearest existing noise-sensitive land use. Therefore, residential mechanical ventilation system operations associate with the Baldwin Master Plan development would not generate a substantial temporary or permanent increase in excess of the City’s nighttime noise performance standards as measured at the nearest sensitive receptors, and the impact would be reduced to less than significant without mitigation.

Level of Significance Before Mitigation
Potentially significant impact.

Mitigation Measures
MM NOI-2a To reduce potential construction noise impacts, the following multi-part mitigation measure shall be implemented for all developments included in the proposed project:

The construction contractor shall ensure that all internal combustion enginedriven equipment is equipped with mufflers that are in good condition and appropriate for the equipment.

7.2.c
Packet Pg. 761 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-24 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx The construction contractor shall locate stationary noise-generating equipment as far as possible from sensitive receptors when sensitive receptors adjoin or are near a construction project area. In addition, the project contractor shall place such stationary construction equipment so that emitted noise is directed away from sensitive receptors nearest the project site.

The construction contractor shall prohibit unnecessary idling of internal combustion engines.

The construction contractor shall, to the maximum extent practical, locate on-site equipment staging areas so as to maximize the distance between constructionrelated noise sources and noise-sensitive receptors nearest the project site during all project construction.

The construction contractor shall limit noise producing construction activity located within five hundred feet of a residential zone, including deliveries and equipment idling activities, to the daytime hours of 7:00 a.m. to 10:00 p.m., unless beforehand a special permit authorizing exception to these hours has been obtained from the officer or body of the city having the function to issue permits of this kind.

MM NOI-2b Proposed parking areas within the Zacharias Master Plan area shall be located a minimum of 100 feet from existing residential land uses or shall provide shielding (e.g., sound barrier) to block the line of sight to nearby noise sensitive land uses to meet the City’s nighttime noise performance standards of 45 dBA Leq or 64 dBA Lmax.

If shielding is needed, shielding shall have a minimum height sufficient to completely block line-of-sight between the on-site noise source and the nearest residential dwelling to meet the City’s noise standards.

MM NOI-2c Proposed mechanical ventilation systems within the Zacharias Master Plan area shall be located a minimum of 55 feet from existing sensitive receptors or should provide shielding to block the line of sight to nearby noise sensitive land uses to meet the City’s noise performance standards of 45 dBA Leq or 64 dBA Lmax. Shielding shall have a minimum height sufficient to completely block line-of-sight between the on-site noise source and the nearest residential dwelling to meet the City’s noise standards.

Based on the size and placement of the HVAC units (i.e., ground level or roof top), barrier heights may range between three to six feet.

Level of Significance After Mitigation
Less than significant impact.

Groundborne Vibration/Noise Levels
Impact NOI-3: The project would not result in generation of excessive groundborne vibration or groundborne noise levels.

Impact Analysis
This impact assesses potential groundborne vibration.

7.2.c
Packet Pg. 762 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Noise
FirstCarbon Solutions 3.11-25
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx Baldwin and Zacharias Master Plan
This section analyzes both construction and operational groundborne vibration impacts. The City of Patterson has not established a standard for excessive groundborne vibration levels resulting from construction activities. Therefore, for purposes of this analysis, the FTA vibration impact criteria are utilized. The FTA has established industry accepted standards for vibration impact assessment in its Transit Noise and Vibration Impact Assessment Manual dated September 2018. These guidelines are summarized in Table 3.11-4.

Construction
Construction activity can result in varying degrees of ground vibration, depending on the equipment used on the site. Operation of construction equipment causes ground vibrations that spread through the ground and diminish in strength with distance. Buildings in the vicinity of a construction site respond to these vibrations with varying results ranging from no perceptible effects at the low levels, to slight damage at the highest levels.

Of the variety of equipment used during construction, the small vibratory rollers that would be used in the site preparation phase of construction would produce the greatest groundborne vibration levels. Small vibratory rollers produce groundborne vibration levels ranging up to 0.101 inch per second (in/sec) PPV at 25 feet from the operating equipment.

The closest off-site structures to development that could occur in the Zacharias Master Plan area are single-family residences located along the plan area’s southern boundary. Based on the proposed land use development plan, the façade of the nearest structure could be located as close as 50 feet from the construction footprint where heavy equipment would operate within the Master Plan area.

At this distance, operation of small vibratory rollers could result in groundborne vibration levels of up to 0.036 PPV at this nearest receptor. This is below the industry standard vibration damage criteria of 0.2 PPV for the most sensitive type of structure: buildings extremely susceptible to vibration damage. Therefore, groundborne vibration levels associated with construction activities at the proposed project site would have a less than significant impact on off-site receptors in the proposed project vicinity.

Operation
The Baldwin Master Plan is residential only and, thus, would not have the potential to introduce new substantial sources of vibration.

The Zacharias Master Plan includes light industrial uses that would be served by trucks. The light industrial uses would be served by Rogers Road, which is currently used by heavy trucks serving Vista Del Lago, the Keystone Pacific Business Park, and the Arambel Business Park. Despite the significant truck volumes on Rogers Road, nearby buildings do not exhibit vibration damage, indicating that truck vibration is de minimis. As such, it would be expected that the Zacharias Master Plan light industrial uses would not result in substantial sources of vibration.

Additionally, the only existing significant permanent sources of groundborne vibration in the vicinity of the area to which the proposed Master Plan area would be exposed is the railroad located adjacent to State Route 33. However, project development would occur beyond 100 feet from the

7.2.c
Packet Pg. 763 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Noise Draft EIR

3.11-26 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-11 Noise.docx tracks, which is beyond the typical screening distance for vibration impacts according to the FTA’s standards. Therefore, project operational groundborne vibration level impacts would be considered less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
None.

Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 764 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Population and Housing
FirstCarbon Solutions 3.12-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-12 Pop and Housing.docx

3.12 - Population and Housing

3.12.1 - Introduction
This section describes population and housing and potential effects from project implementation on the site and its surrounding area. Descriptions and analysis in this section are based on information provided by California Department of Finance, California Employment Development Department, and the City of Patterson General Plan.

3.12.2 - Existing Conditions
Population and Housing Characteristics
The California Department of Finance estimated Patterson’s population to be 23,764 as of 2019.

Table 3.12-1 summarizes existing population and housing characteristics.

Table 3.12-1: Existing Population and Housing Characteristics (2019) Population
Dwelling Units
Total Occupied Vacant Persons Per Household
23,764 6,619 6,054 565 3.93
Source: California Department of Finance, 2020.

Historical Population Growth
The population of Patterson has grown significantly in the 49 years between 1970 and 2019. The City experienced most of the population growth between 1985 and 1990 and 2000 and 2010. The City’s historic population growth is summarized in Table 3.12-2.

Table 3.12-2: Historical Population Growth
Year Population Net Change From Previous
1970 3,147 –
1975 4,040 893
1980 3,908 (132)
1985 4,690 782
1990 8,626 3,936
1995 9,734 1,108
2000 11,606 1,872
2005 15,677 4,071
2010 20,413 4,736
2015 21,683 1,270
2019 23,764 2,081
Source: California Department of Finance, 2020.

7.2.c
Packet Pg. 765 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Population and Housing Draft EIR

3.12-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-12 Pop and Housing.docx Projected Population Growth
Population growth is projected to continue for the near future, primarily driven by continued demand for relatively affordable housing and quality of life in Patterson. The City of Patterson General Plan projects a buildout population of 66,673 persons, which is expected to occur sometime after 2030.

Employment
The California Employment Development Department estimated the Patterson work force to be 10,100 and the Stanislaus County workforce to be 243,700 as of February 2020. Employment characteristics for both Patterson and Stanislaus County are summarized in Table 3.12-3.

Table 3.12-3: Employment Summary
Jurisdiction Labor Force Employed Persons Unemployed Persons Unemployment Rate Patterson 10,100 9,500 600 6.1%
Stanislaus County 243,700 227,700 16,000 6.6%
Source: California Employment Development Department, 2020.

Projected Employment Growth
The City of Patterson General Plan projects a buildout employment figure of 32,196, which is expected to occur sometime after 2030.

3.12.3 - Regulatory Setting
State
California Housing Element Law
State law requires each city and county to adopt a general plan for future growth. This plan must include a housing element that identifies housing needs for all economic segments and provides opportunities for housing development to meet that need. At the state level, the Department of Housing and Community Development (HCD) estimates the relative share of California’s projected population growth that would occur in each county in the State, based on DOF population projections and historic growth trends. Where there is a regional council of governments, such as StanCog, HCD provides the regional housing need to the council. The council then assigns a share of the regional housing need to each of its cities and counties. The process of assigning shares provides cities and counties the opportunity to comment on the proposed allocations. HCD oversees the process to ensure that the council of governments distributes its share of the State’s projected housing need.

Each city and county must update its general plan housing element on a regular basis (approximately every 5 years). Among other things, the housing element must incorporate policies and identify potential sites that would accommodate a city’s share of the regional housing need. Before adopting an update to its housing element, a city or county must submit the draft to HCD for review. HCD will

7.2.c
Packet Pg. 766 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Population and Housing
FirstCarbon Solutions 3.12-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-12 Pop and Housing.docx advise the local jurisdiction whether its housing element complies with the provisions of California Housing Element Law.

The councils of governments are required to assign regional housing shares to the cities and counties within their region on a similar 5-year schedule. At the beginning of each cycle, HCD provides population projections to the councils of governments, which then allocate shares to their cities and counties. The shares of the regional need are allocated before the end of the cycle so that the cities and counties can amend their housing elements by the deadline.

Local
City of Patterson
General Plan
The General Plan establishes the following goals and policies related to population, housing, and employment that are applicable to the proposed project:

Goal ED-2: To prepare and acquire an educated and skilled workforce to match the needs of the local and regional economies.

Goal ED-2: To promote a diverse and balanced mix of employment and housing opportunities.

Policy ED-3.1: Jobs-to-housing ratio. The City shall maintain an adequate retail, business, and industrial land supply to meet a jobs-to-housing ratio of at least 1.0.

Goal H-1: It is the Goal of the City of Patterson to assist in increasing the availability of permanent housing for all community residents.

Policy H-1-6-1: Continue to cooperate with large employers, and major commercial and industrial developers to identify and implement programs to balance employment growth, as outlined in the Land Use Goals of the 2004 Update of the Patterson General Plan, with the ability to provide housing opportunities affordable to the incomes of the newly created job opportunities and consider the effects of new employment, particularly in relation to housing demands, when new commercial or industrial development is proposed.

Goal LU-1.6: Small town character. The City shall seek to preserve Patterson’s traditional small-town qualities and agricultural heritage, while increasing its residential and employment base.

Goal LU-1.9: Managing the relationship between jobs and housing. The City shall monitor residential and non-residential development and encourage adjustments as necessary in land use designations and the rate of project approvals to promote a reasonable citywide balance between new employment-generating development and housing development and to minimize traffic impacts.

3.12.4 - Methodology
Impacts on population, housing, and employment were assessed by reviewing existing and anticipated population, housing, and employment projections provided the California Department of Finance, the California Employment Development Department and the City of Patterson General Plan.

7.2.c
Packet Pg. 767 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Population and Housing Draft EIR

3.12-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-12 Pop and Housing.docx

3.12.5 - Thresholds of Significance
According to the CEQA Guidelines’ Appendix G Environmental Checklist, to determine whether impacts to population and housing are significant environmental effects, the following questions are analyzed and evaluated. Would the project:
a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
b) Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?

3.12.6 - Project Impacts and Mitigation Measures
This section discusses potential impacts associated with the proposed project and provides mitigation measures where necessary.

Growth Inducement
Impact POP-1: Buildout of the Master Plans would not induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure).

Impact Analysis
There are two types of direct growth inducement: construction of new dwelling units and the creation of new job opportunities. Indirect growth inducement occurs when “barriers to growth” are removed, such as the extension of essential utilities to unserved areas.

At buildout, the two Master Plans would support an estimated 19,988 new residents and 8,670 employees on existing agricultural land that would be annexed into the City of Patterson.

Additionally, the Master Plans contemplate a network of urban infrastructure including roads and utilities. Each Master Plan is discussed separately.

Baldwin Master Plan
The Baldwin Master Plan would support a population of 1,199 at buildout. Because of its small size and single use, the Baldwin Master Plan would buildout over a period of 5 years. When compared to the historical population growth totals shown in Table 3.12-2, the Baldwin Master Plan would be in line with past growth periods.

The City of Patterson General Plan contemplates a buildout population of 66,673 persons. Given that the City’s existing population (23,764) is roughly half of the projected buildout population, the Baldwin Master Plan would be within the General Plan’s growth projections.

The Baldwin Master Plan would include the extension of roads, storm drainage, water, sewer, electricity, and natural gas services to the Master Plan area. These connections would occur at Baldwin Road or Sperry Avenue. No off-site infrastructure connections would occur through areas

7.2.c
Packet Pg. 768 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Population and Housing
FirstCarbon Solutions 3.12-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-12 Pop and Housing.docx unserved by urban infrastructure. As such, the proposed Master Plan would not result in growth inducement.

Zacharias Master Plan
The Zacharias Master Plan would support a population of 18,789 and 8,670 employees at buildout.

Because of its size and scale, the Zacharias Master Plan would buildout over a period of 20 years.

When broken down into 5-year increments, this averages to 4,695 additional persons and 2,168 additional employees every 5 years. When compared to the historical population growth totals shown in Table 3.12-2, the Zacharias Master Plan would be in line with past growth periods.

The City of Patterson General Plan contemplates a buildout population of 66,673 persons and 32,196 employees. Given that the City’s existing population (23,764) is roughly half of the projected buildout population and existing employment (9,500) is roughly a third of the projected buildout employment, the Zacharias Master Plan would be within the General Plan’s growth projections.

The Zacharias Master Plan would include the extension of roads, storm drainage, water, sewer, electricity, and natural gas services to the Master Plan area. These connections would occur at Keystone Pacific Parkway, Baldwin Road, and Ward Avenue. No off-site infrastructure connections would occur through areas unserved by urban infrastructure. As such, the proposed Master Plan would not result in growth inducement.

Combined Master Plans
The Baldwin Master Plan and Zacharias Master Plan would add a combined 19,988 persons and 8,670 employees at buildout. The City of Patterson General Plan contemplates a buildout population of 66,673 persons and 32,196 employees. Given that the City’s existing population (23,764) is roughly half of the projected buildout population and existing employment (9,500) is roughly a third of the projected buildout employment, both Master Plans would be within the General Plan’s growth projections. As such, the proposed Master Plan would not result in growth inducement.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is necessary.

Level of Significance After Mitigation
Less than significant impact.

Housing Displacement
Impact POP-2: The project would not displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere.

Impact Analysis
This impact assesses whether the proposed Master Plans would displace housing or persons.

7.2.c
Packet Pg. 769 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Population and Housing Draft EIR

3.12-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-12 Pop and Housing.docx Baldwin Master Plan
Buildout of the Master Plan would be limited to the Master Plan boundaries. There is an existing cluster of structures that include at least one residence. The removal of these structures would not represent the loss of a substantial amount of housing given that 305 new dwelling units would be developed in their place. Impacts would be less than significant.

Zacharias Master Plan
The 1,160 acres of the Master Plan area that excludes the Ranchette Triangle contains agricultural land. There are two clusters of residential and agricultural structures within this area that would ultimately be removed as the Master Plan builds out. The removal of these structures would not represent the loss of a substantial amount of housing given that 4,350 new dwelling units would be developed in their place.

The 137-acre Ranchette Triangle contains more than 30 separate parcels. The Master Plan allows property owners to continue existing land use activities after annexation. Thus, any change in land use activities (including development to a higher and better use) would be the prerogative of the property owner. Regardless, there would be a net increase in the number of dwelling units, which would offset the loss of the existing dwelling units.

Impacts would be less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
No mitigation is necessary.

Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 770 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Public Services and Recreation
FirstCarbon Solutions 3.13-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx

3.13 - Public Services and Recreation

3.13.1 - Introduction
This section describes the existing public services and potential effects from project implementation on the site and its surrounding area. Descriptions and analysis in this section are based, in part, on information provided by the Patterson Fire Department, Patterson Police Services, the Patterson Unified School District, and the Patterson Parks and Recreation Department.

3.13.2 - Environmental Setting
Fire Protection
Patterson Fire Department
The Patterson Fire Department (Fire Department) provides fire protection and emergency medical services to the City of Patterson. The Fire Department operates two stations, which are summarized in Table 3.13-1.

Table 3.13-1: Patterson Fire Department
Station No. Address
Distance from
Rogers
Road/Zacharias
Road
Distance
from South
End of
Baldwin
Road Apparatus Staffing
1 (Headquarters)
344 West
Las Palmas
Avenue

3.7 miles 2.2 miles Type-1 Fire Engine (2);
Type-2 Rescue Apparatus
(1); Chief Officer
(Command) Vehicle (3)
Fire Chief (1);
Division Chief (2)
Line Personnel (2
per 48-hour shift)
2 1950
Keystone
Pacific
Parkway

1.9 miles 1.6 miles Type-1 Fire Engine* (1-
Initial Attack, 1-Reserve
Engine) Type-1 Ariel 105-
foot Ladder Truck* (1);
IRB Rescue Boat (1)
Line Personnel (2
per 48-hour shift)
Notes:

Station No. 1 shared with West Stanislaus County Fire Protection District. * The Initial Attack Engine and Type-1 Ladder Truck are cross-staffed by on-duty personnel at Fire Station No. 2.

Source: City of Patterson, 2019.

The Del Puerto Health Care District also provides ambulance services to Patterson and surrounding communities. The Health Care District operates the Health Center at 1108 Ward Avenue in Patterson.

Staffing
The Fire Department’s sworn personnel consist of the Fire Chief, two Division Chiefs, four captains, two captain/medics, four engineers, two engineer/medics, and three firefighters/medics. The Fire Department staffs two stations 24 hours a day, 7 days a week with career personnel.

7.2.c
Packet Pg. 771 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Public Services and Recreation Draft EIR

3.13-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx Calls for Service
The Fire Department responds to more than 1,600 incidents annually, with roughly 80 percent being medical in nature.

Response Times
The Fire Department indicated that the average response time in 2008 was 5 minutes, 31 seconds.

According to the Patterson General Plan, the goal for average response time for Priority 1 (emergency) calls is 5 minutes for 95 percent of the calls.

Aid Agreements
The Fire Department has a mutual aid agreement with the West Stanislaus Fire District, neighboring fire agencies located within Stanislaus County (including Woodland Avenue Fire District, Salida Fire District, Westport Fire District, and Mountain View Fire District), and CalFire.

West Stanislaus Fire Protection District
The West Stanislaus County Fire Protection District (Fire Protection District) provides fire protection and emergency medical services to an approximately 625-square-mile service area that consists of the unincorporated areas that are located west of the San Joaquin River. The Fire Protection District operates six stations, including two shared stations with the Patterson Fire Department and Newman Fire Department. Table 3.13-2 summarizes the Fire Protection District’s fire stations.

Table 3.13-2: West Stanislaus County Fire Protection District Station Summary Station Apparatus
Patterson* (Headquarters) Type 1 Engine (2)
Type 3 Engine (1)
Water Tender (1)
Rescue Vehicle (1)
Truck (1)
Command Vehicle (4)
Newman** Type 1 Engine (1)
Type 3 Engine (1)
Rescue Vehicle (1)
Crows Landing Type 1 Engine (2)
Water Tender (1)
Westley Type 1 Engine (1)
Water Tender (1)
Rescue Vehicle (1)
El Solyo (Vernalis) Type 2 Engine (2)
Water Tender (1)
Diablo Grande Type 1 Engine (1)
Type 3 Engine (1)
Notes:
* Shared with the Patterson Fire Department
** Shared with the Newman Fire Department
Source: West Stanislaus Fire Protection District, 2019.

7.2.c
Packet Pg. 772 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Public Services and Recreation
FirstCarbon Solutions 3.13-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx Staffing
The Fire Protection District is staffed by three career Chief Officers, three career administrative staff persons, 10 volunteer chief officers, 10 volunteer officers, and 100 volunteer firefighters.

Police Protection
Police services in Patterson are provided on a contractual basis by the Stanislaus County Sheriff’s Department. Within Patterson, the Police Services is headquartered at 33 South Del Puerto Avenue in downtown Patterson. All law enforcement operations and support services for Patterson originate from the Police Services headquarters.

Staffing
The Police Services currently employs 21 sworn staff and four non-sworn civilian staff.

Calls for Service
In 2010, Patterson Police Services received 17,663 calls for services.

Response Times
According to the Patterson General Plan, the goal for average response time for Priority 1 (emergency) calls is 3 minutes. The Police Services has indicated that the response time for Priority 1 calls for service are generally within 3 minutes and, therefore, meets the General Plan goal.

Schools
Patterson Unified School District (PUSD) provides K-12 educational services to the City of Patterson and surrounding unincorporated areas of Stanislaus County. PUSD has a K-12 enrollment of more than 6,000 students.

School Facilities
PUSD operates nine schools that are summarized in Table 3.13-3.

Table 3.13-3: School Summary
School Grades Enrollment
Apricot Valley Elementary K-5 762
Creekside Middle 6-8 1,146
Grayson Elementary K-5 266
Del Puerto High 11-12 98
Las Palmas Elementary K-5 598
Patterson High 9-12 1,738
Northmead Elementary K-5 629
Open Valley Independent Study 6-12 53
Walnut Grove K-8 765
Source: Patterson Unified School District, 2019.

7.2.c
Packet Pg. 773 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Public Services and Recreation Draft EIR

3.13-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx Planned Facilities
PUSD acquired land at the northeastern quadrant of Baldwin Road/Zacharias Road for a future high school.

Parks and Recreation
The City of Patterson Recreation and Community Services Department maintains and operates parks and recreational facilities within the Patterson city limits. The City maintains 34 parks ranging in size from less than 1 acre to 12 acres. In total, the City has 98 acres of parks and recreation acreage.

Facilities include the T.W. Patterson Sports Complex, the Patterson Aquatics Center and Skatepark, Walnut Grove Gym, the Hammon Senior Center, as well as a number of school and neighborhood parks.

3.13.3 - Regulatory Framework
State
California Building Standards Code
Title 24 of the California Code of Regulations, also known as the California Building Standards Code, is a compilation of three types of building standards from three different origins:

Building standards that have been adopted by state agencies without change from building standards contained in national and international model codes.

Building standards that have been adopted and adapted from the national and international model code standards to meet California conditions.

Building standards, authorized by the California legislature, which constitute extensive additions not covered by the model codes that have been adopted to address particular California concerns.

The California Fire Code is a component of the California Building Standards Code and contains firesafety-related building standards.

Local
City of Patterson
General Plan
The General Plan establishes the following goals and policies associated with public services and recreation that are applicable to the proposed project:

Goal PS-5: To ensure that an adequate level of police service is maintained as new development occurs.

Policy PS-5.1: Police response time. The City shall, through adequate staffing and patrol arrangements, and through the establishment of police stations/patrol offices, endeavor to maintain the minimum feasible response times for police calls for all parts of the City. The goal for average response time for Priority 1 (emergency) calls shall be three minutes.

7.2.c
Packet Pg. 774 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Public Services and Recreation
FirstCarbon Solutions 3.13-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx Policy PS-5.2: Response time monitoring. The Police Services Department shall continually monitor response times and report annually on the results of the monitoring.

Policy PS-5.3: Ratio of police officers to population. The City shall endeavor to achieve and maintain a ratio of 1.5 police officers per 1,000 population.

Policy PS-5.4: Agency cooperation. The City shall continue to work with other agencies to facilitate the most cost-effective provision of law enforcement and social services for Patterson residents.

Goal PS-6: To ensure that an adequate level of fire service is maintained as new development occurs.

Policy PS-6.1: Fire response time. The City shall endeavor to achieve and maintain an overall fire insurance (ISO) rating of 5 or better. The goal for average response time for Priority 1 (emergency) calls shall be five minutes for 95 percent of the calls.

Policy PS-6.2: Location of stations. Fire stations shall be strategically located to ensure optimal response time. The existence of physical barriers such as railroad tracks shall be an important siting consideration.

Policy PS-6.3: Fire Code requirements. The City shall continue to apply the California Fire Code requirements for built-in fire suppression equipment in all new development.

Policy PS-6.4: Ratio of fire fighters to population. The City shall endeavor to achieve and maintain a ratio of 1.0 fire fighters per 1,000 population.

Policy PS-9.3: Underground utilities. The City shall, where suitable, require all new electrical and communication facilities to be installed underground or, in the case of transformers, padmounted. The City shall actively promote the undergrounding of existing overhead facilities.

Goal PR-1: To establish and maintain a public park system and recreation facilities suited to the needs of Patterson residents and visitors.

Policy PR-1.1: Parks and Recreation Facilities Master Plan. The city shall prepare and adopt a Parks and Recreation Facilities Master Plan which includes the following components:
- Locational standards
- Preferred sites
- Improvement and equipment standards
- Developmental priorities
- Financing mechanisms
- Development of community activity centers
- Sports facilities
- Joint use facilities
Policy PR-1.2: Parks standard. The City shall establish a minimum of five acres of developed parkland (combined pocket, neighborhood, and community) per 1,000 residents.

Policy PR-1.3: Requirements for development. New development shall be required to assist in meeting the City’s standard of five acres per 1,000 residents. To this end, the City shall require

7.2.c
Packet Pg. 775 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Public Services and Recreation Draft EIR

3.13-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx all new development to dedicate land, dedicate improvements, pay in-lieu fees, or a combination of these determined acceptable by the City, to the maximum extent authorized by law.

Policy PR-1.5: Neighborhood parks. Neighborhood parks shall be integrated into, and become focal points of, new residential neighborhoods. Pedestrian accessibility to these parks shall be emphasized.

Policy PR-1.7: Joint-use. The City shall pursue and maintain agreements for joint-use of school facilities as a high priority for the development of new park and recreational facilities, especially for after-school activities.

Policy PR-1.8: Safety. Parks shall be located, oriented, and designed in such a way as to facilitate security, policing, and maintenance.

Policy PR-1.9: Nuisance. High-activity-level parks and parks intended for night use shall be designed to buffer existing and planned surrounding residential uses from excessive noise, light, and other potential nuisances.

Policy PR-1.11: Design for droughts. The City shall emphasize the use of drought-tolerant, drought-resistant and low use irrigation landscaping in the development of City parks.

Policy PR-1.13: Open spaces as buffers. The City shall encourage the use of open space and recreational uses as buffers between incompatible land uses.

Policy PR-1.14: Pedestrian/bicycle network. The City shall pursue the development of a citywide network of pedestrian and bicycle pathways to integrate with existing and future regional, community, neighborhood, and, to the extent possible, pocket parks. (See the Circulation Element for more policies).

Municipal Code
The Municipal Code includes by adoption the California Fire Code as published by the International Code Council and referred to as the Fire Code of the City of Patterson. The Fire Code regulates and governs the safeguarding of life and property from fire and explosion hazards.

3.13.4 - Methodology
FCS staff consulted with public services and utility providers regarding their ability to serve the proposed project. Letters were sent to the Patterson Police Department, the Patterson Fire Department, PUSD, and Patterson Parks and Recreation Department requesting information about their ability to serve the proposed project. The agency responses are provided in Appendix G.

3.13.5 - Thresholds of Significance
According to Appendix G, Environmental Checklist, of the CEQA Guidelines, public services and recreation impacts resulting from the implementation of the proposed project would be considered significant if the project would:
. . . result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental

7.2.c
Packet Pg. 776 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Public Services and Recreation
FirstCarbon Solutions 3.13-7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
a) Fire protection?
b) Police protection?
c) Schools?
d) Parks?
e) Other public facilities?
f) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
g) Does the project include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment?

3.13.6 - Project Impacts and Mitigation Measures
Fire Protection
Impact PSR-1: Buildout of the Master Plans may result in a need for new or expanded fire protection facilities.

Impact Analysis
This impact assesses whether the proposed project would result in a need for new or expanded fire protection and emergency medical service facilities.

Baldwin Master Plan
Fire Station No. 2 is located 1.7 miles from the Baldwin Master Plan area. Using an average travel speed of 35 miles per hour, a fire engine traveling from Station No. 2 to the Master Plan area would take 2 minutes, 55 seconds. This is considered an acceptable response time and, thus, the Master Plan would not require the construction of new fire station in order to achieve maintain adequate response times.

The City of Patterson General Plan Policy PS-6.4 sets forth a staffing ratio of 1.0 firefighter per 1,000 residents. Buildout of the Baldwin Master Plan would add 1,199 residents to the City of Patterson and, thus, create a need for 1-2 additional firefighters. Staffing is a policy decision at the discretion of the Patterson City Council and outside the scope of the environmental reviews process because it does not have physical impacts on the environment.

Nonetheless, buildout of the Master Plan would create a citywide need for at least one additional fire station or expansion of one of the two existing fire stations. Mitigation Measure (MM) PSR-1 requires the Master Plan applicant to pay development fees in accordance with the latest adopted

7.2.c
Packet Pg. 777 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Public Services and Recreation Draft EIR

3.13-8 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx fee schedule at the time building permits are sought. As such, impacts associated with fire protection are less than significant.

Zacharias Master Plan
Fire Station No. 2 is located 2.5 miles from the intersection of Rogers Road/Zacharias Road, the furthest portion of the Zacharias Master Plan area from the fire station. Using an average travel speed of 35 miles per hour, a fire engine traveling from Station No. 2 to the Master Plan area would take 4 minutes, 17 seconds. This is considered an acceptable response time and, thus, the Master Plan would not require the construction of new fire station in order to achieve maintain adequate response times.

The City of Patterson General Plan Policy PS-6.4 sets forth a staffing ratio of 1.0 firefighter per 1,000 residents. Buildout of the Zacharias Master Plan would add 18,789 residents to the City of Patterson and, thus, create a need for 18-19 additional firefighters. Staffing is a policy decision at the discretion of the Patterson City Council and outside the scope of the environmental reviews process because it does not have physical impacts on the environment.

Nonetheless, buildout of the Master Plan would create a citywide need for at least one additional fire station or expansion of one of the two existing fire stations. MM PSR-1 requires the Master Plan applicant to pay public safety development fees in accordance with the latest adopted fee schedule at the time building permits are sought.

As such, impacts associated with fire protection are less than significant.

Level of Significance Before Mitigation
Potentially significant impact.

Mitigation Measures
MM PSR-1 Prior to issuance of building permits, the applicant shall pay all public safety development fees in accordance with the City of Patterson’s latest adopted fee schedule.

Level of Significance After Mitigation
Less than significant impact.

Police Protection
Impact PSR-2: Buildout of the Master Plans may result in a need for new or expanded police protection facilities..

Impact Analysis
This impact assesses whether the proposed project would require a need for new or expanded police protection facilities.

7.2.c
Packet Pg. 778 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Public Services and Recreation
FirstCarbon Solutions 3.13-9
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx Baldwin Master Plan
Police headquarters are located 2.5 miles from the Baldwin Master Plan area. The Patterson Police regularly patrol all parts of the city limits and, thus, police units would be expected to be able to respond to calls within the Baldwin Master Plan area within acceptable response times. As such, the Master Plan would not require the construction of new police facilities in order to achieve maintain adequate response times.

The City of Patterson General Plan Policy PS-5.3 sets forth a staffing ratio of 1.5 police officers per 1,000 residents. Buildout of the Baldwin Master Plan would add 1,199 residents to the City of Patterson and, thus, create a need for 1-2 additional police officers. Staffing is a policy decision at the discretion of the Patterson City Council and outside the scope of the environmental review process because it does not have physical impacts on the environment.

Nonetheless, buildout of the Master Plan would create a citywide need for at least one additional police station or expansion of the existing police station. MM PSR-1 requires the Master Plan applicant to pay public safety development fees in accordance with the latest adopted fee schedule at the time building permits are sought. As such, impacts associated with police protection are less than significant.

Zacharias Master Plan
Police headquarters are located 3.7 miles from the intersection of Rogers Road/Zacharias Road, the furthest portion of the Zacharias Master Plan area from headquarters. The Patterson Police regularly patrol all parts of the city limits and, thus, police units would be expected to be able to respond to calls within the Zacharias Master Plan area within acceptable response times. As such, the Master Plan would not require the construction of new police facilities in order to achieve maintain adequate response times.

The City of Patterson General Plan Policy PS-5.3 sets forth a staffing ratio of 1.5 police officers per 1,000 residents. Buildout of the Zacharias Master Plan would add 18,789 residents to the City of Patterson and, thus, create a need for 28-29 additional firefighters. Staffing is a policy decision at the discretion of the Patterson City Council and outside the scope of the environmental review process because it does not have physical impacts on the environment.

Nonetheless, buildout of the Master Plan would create a citywide need for at least one additional police station or expansion of the existing police station. MM PSR-1 requires the Master Plan applicant to pay public safety development fees in accordance with the latest adopted fee schedule at the time building permits are sought.

As such, impacts associated with police protection are less than significant.

Level of Significance Before Mitigation
Potentially significant impact.

Mitigation Measures
Implement MM PSR-1.

7.2.c
Packet Pg. 779 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Public Services and Recreation Draft EIR

3.13-10 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx Level of Significance After Mitigation
Less than significant impact.

Schools
Impact PSR-3: Buildout of the Master Plans would not result in a need for new or expanded schools beyond those contemplated by the project..

Impact Analysis
This impact assesses whether the proposed project would require a need for new or expanded school facilities.

Baldwin Master Plan
Buildout of the Baldwin Master Plan would add 305 dwelling units and 1,199 residents to the City of Patterson. Using a student generation rate of 0.624 student/dwelling unit, the Baldwin Master Plan would add 191 students to PUSD. This was calculating using a conservative student generation rate of 0.624 student per dwelling unit as set forth in the 2018 School Facility Needs Analysis for the Patterson Join Unified School District.

The Baldwin Master Plan applicant would be required to pay development fees to the School District to fund capital improvements to school facilities. Pursuant to Government Code Section 65995, payment of development fees is “full and complete mitigation” for impacts on schools. Impacts would be less than significant.

Zacharias Master Plan
Buildout of the Zacharias Master Plan would add 4,781 dwelling units and 18,789 residents to the City of Patterson. Using a student generation rate of 0.624 student/dwelling unit, the Zacharias Master Plan would add 2,984 students to PUSD.

The Zacharias Master Plan contemplates an approximately 14-acre elementary school site east of Baldwin Road and a 16-acre middle school site west of Baldwin Road. Those schools are part of the Master Plan and are evaluated in this EIR. Following adoption of the Zacharias Master Plan entitlements, PUSD will have a defined period of time to exercise its option to acquire and develop the schools. The Zacharias Master Plan applicants that would dedicate school sites would be credited the value of the land against is school development fee obligation.

For the Zacharias Master Plan applicants that do not dedicate school sites, they would be required to pay development fees to the School District to fund capital improvements to school facilities.

Pursuant to Government Code Section 65995, payment of development fees is “full and complete mitigation” for impacts on schools. Impacts would be less than significant.

As such, impacts associated with fire protection are less than significant.

Level of Significance Before Mitigation
Less than significant impact.

7.2.c
Packet Pg. 780 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Draft EIR Public Services and Recreation
FirstCarbon Solutions 3.13-11
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact.

Parks and Recreation
Impact PSR-4: Buildout of the Master Plans would not result in a need for new or expanded park and recreational facilities beyond those contemplated by the project..

Impact Analysis
This impact assesses whether the proposed project would require a need for new or expanded park and recreation facilities.

Baldwin Master Plan
Buildout of the Baldwin Master Plan would add 1,199 residents to the City of Patterson. The City of Patterson General Plan Goal PR-1, and Policies PR-1.1, 1.2, 1.3, 1.5, and 1.7 require the City to maintain at least 5 acres of parkland, open space, or recreational areas per 1,000 residents. Thus, the Zacharias Master Plan would be required to provide 6 acres of parkland, open space, or recreational areas.

The Zacharias Master Plan proposes 2.0 acres of parks, 2.0 acres of dual use park/basin, and 1.0 of acre buffer/trails. Furthermore, the City may require the applicant to pay in-lieu fees to fund the development of park facilities elsewhere.

Zacharias Master Plan
Buildout of the Zacharias Master Plan would add 18,789 residents to the City of Patterson. The City of Patterson General Plan Goal PR-1, and Policies PR-1.1, 1.2, 1.3, 1.5, and 1.7 require the City to maintain at least 5 acres of parkland, open space, or recreational areas per 1,000 residents. Thus, the Zacharias Master Plan would be required to provide 94 acres of parkland, open space, or recreational areas.

The Zacharias Master Plan proposes 60.7 acres of parks/trails and 13.4 acres of open space/lake. In addition to these features, the Zacharias Master Plan also proposes to construct a dual use regional athletic facility/flood control basin. These park facilities are part of the Master Plan and are evaluated in this EIR. Furthermore, the City may require the applicants to pay in-lieu fees to fund the development of park facilities elsewhere.

As such, impacts associated with parks are less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
None required.

7.2.c
Packet Pg. 781 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson— Baldwin Master Plan / Zacharias Master Plan Project Public Services and Recreation Draft EIR

3.13-12 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/17900003 Sec03-13 Public Services and Recreation.docx Level of Significance After Mitigation
Less than significant impact.

Other Public Facilities
Impact PSR-5: Buildout of the Master Plans would not result in a need for new or expanded public facilities such as libraries..

Impact Analysis
This impact assesses whether the proposed project would require a need for new or expanded library facilities.

Baldwin Master Plan
Buildout of the Baldwin Master Plan would add 1,199 residents to the City of Patterson and increase the use of libraries. The City will require the applicant to pay in-lieu fees to fund the development of libraries facilities elsewhere. As such, impacts associated with other public facilities are less than significant.

Zacharias Master Plan
Buildout of the Zacharias Master Plan would add 18,789 residents to the City of Patterson and increase the use of libraries. The City will require the applicant to pay in-lieu fees to fund the development of libraries facilities elsewhere. As such, impacts associated with other public facilities are less than significant.

Level of Significance Before Mitigation
Less than significant impact.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact.

7.2.c
Packet Pg. 782 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Administrative Draft EIR Transportation
FirstCarbon Solutions 3.14-1
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx

3.14 - Transportation

3.14.1 - Introduction
This section describes the existing transportation setting and potential effects from project implementation on the site and its surrounding area. Descriptions and analysis in this section are based on the Traffic Impact Study prepared by Advanced Mobility Group (AMG). The complete study is provided in Appendix H.

3.14.2 - Environmental Setting
Roadway Network
The following section describes the existing transportation conditions in the vicinity of the study area, including descriptions of the existing street system and intersection operating conditions.

Interstate 5
Interstate 5 (I-5) is a four-lane freeway near Patterson. Per the 2016 traffic counts obtained from the Caltrans website, I-5 carries between 40,000 to 48,000 vehicles per day (vpd) in the vicinity of Sperry Avenue. For regional travel, residents rely primarily on I-5, a major north-south freeway to the west of the city limits. I-5 connects to I-580, approximately 15 miles to the north of Patterson. I-5 and I580 provide access to regional employment centers in Pleasanton, San Ramon, and the rest of the San Francisco Bay Area.

The interchange of I-5/Sperry Avenue is configured as a tight diamond (Type L1) with a narrow underpass road and a steep drop in grade next to the northbound on-ramp. All ramps have one lane in each direction.

State Route 33
State Route 33 (SR-33) is located approximately three miles to the east of I-5. SR-33 provides northsouth access to Westley to the north and the City of Newman to the south. Its ADT is approximately 6,000 vpd. It is the main north-south roadway in Patterson.

Sperry Avenue is a two- to four-lane major arterial roadway that serves as the major route of travel between I-5 to the west and the City of Patterson to the east. Sperry Avenue terminates at SR-33, three miles east of I-5. Near the freeway, its ADT ranges between 12,000 to 14,000 vpd. A recent count to the east of Rogers Road showed the ADT to be approximately 15,040 vpd.

Rogers Road
Rogers Road is a two to three lane north-south collector street located generally to the east of I-5.

The road starts from Sperry Avenue to the south and ends at SR-33 to the north. Its ADT is approximately 2,400 vpd.

East Las Palmas Avenue
East Las Palmas Avenue is a three-lane major east west arterial including a center two-way left-turn lane between SR-33 and Sycamore Avenue, where it narrows to a two-lane road. To the west of SR7.2.c Packet Pg. 783 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Zacharias Master Plan Project
Transportation Administrative Draft EIR

3.14-2 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx
33, four streets form a roundabout at Las Palmas Avenue. Most traffic destined for Modesto currently uses Las Palmas Avenue. Its ADT is approximately 11,800 vpd. The name changes to W.

Main Street near the San Joaquin River.

Zacharias Road
Zacharias Road is currently a primarily two-lane rural road that extends from SR-33 in the east to slightly past I-5 freeway underpass. West of Rogers Road it is generally unpaved two-lane farm road.

Its ADT is approximately 320 vpd.

Baldwin Road
Baldwin Road is a two-lane north-south collector roadway that connects State Route 33 in the north and a residential neighborhood to the south of Sperry Avenue. This roadway provides access to the industrial and retail establishments in the northwest part of Patterson as well as to residential neighborhoods. Its ADT is approximately 4,910 vpd.

Roadway and Intersection Operating Conditions
Traffic Data Collection
Based on discussions with City staff, the following study intersections as shown in Exhibit 3.14-1 were selected for analysis:
1 Sperry Avenue/I-5 SB Off-Ramps
2 Sperry Avenue/I-5 NB On-Ramps
3 Sperry Avenue/Rogers Road
4 Sperry Avenue/Park Center Drive
5 Sperry Avenue/Baldwin Road
6 Sperry Avenue/American Eagle Drive
7 Sperry Avenue/Ward Avenue
8 Sperry Avenue/South Del Puerto Avenue
9 Sperry Avenue/SR-33
10 Walnut Avenue/M Street/SR-33
11 SR-33/Las Palmas Avenue
12 Olive Avenue/SR-33
13 Park Center/Keystone Pacific Parkway
14 Rogers Road/Keystone Pacific Parkway
15 Rogers Road/Zacharias Road
16 Baldwin Road/Zacharias Road
17 Zacharias Road/SR-33
18 Ward Avenue/SR-33
19 SR-33/Eucalyptus
20 Baldwin Road/SR-33
21 Rogers Road/SR-33
22 Sycamore Avenue/Eucalyptus
23 Elm Avenue/Eucalyptus Avenue
24 Sycamore Avenue/Las Palmas Avenue
25 Elm Avenue/Las Palmas Avenue
26 Jennings Road/West Main Avenue
27 SR-33 / New East-West Connection
28 Ward Avenue / New East-West
Connection
29 SR-33/Grayson Road
30 Marshall Road / Ward Avenue
31 SR-33 / Marshall Road
32 SR-33 /Crows Landing / Fink Road
The AM and PM peak-hour intersection turning movement counts were collected either on May 2018 or in April 2019. Counts for three of the intersections south of Marshall Road were based on factoring of 2014 counts from the Crows Landing Industrial Business Park Transportation Infrastructure Plan. Exhibit 3.14-2 shows the turning movement volumes and lane configuration at each study intersection.

7.2.c
Packet Pg. 784 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Administrative Draft EIR Transportation
FirstCarbon Solutions 3.14-3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx
Level of Service
Level of Service is a qualitative index of the performance of an element of the transportation system.

Level of Service (LOS) is a rating scale running from A to F, with A indicating no congestion of any kind, and F indicating intolerable congestion and delays.

The 2010 Highway Capacity Manual (HCM) is the standard reference published by the Transportation Research Board and contains the specific criteria and methods to be used in assessing LOS. There are several software packages that have been developed to implement HCM. In this study the Synchro software was used to calculate the LOS at the study intersections.

Signalized Intersections
The relationship between average control delay, driver’s perception of traffic, and LOS for signalized intersections is summarized in Table 3.14-1.

Table 3.14-1: Signalized Intersection LOS Criteria
LOS Driver’s Perception and Traffic Operation Description Delay in Seconds A Little or no delays < 10
B Short traffic delays > 10–15
C Average traffic delays > 15–25
D Long traffic delays > 25–35
E Very long traffic delays > 35–50
F Extreme traffic delays with intersection capacity exceeded > 50 Source: AMG 2020.

Unsignalized Intersections
The method of unsignalized intersection capacity analysis used in this study is from Chapter 19, “Two-Way Stop-Controlled Intersections” of the Highway Capacity Manual. This method applies to two-way STOP sign or YIELD sign-controlled intersections (or one-way STOP sign or YIELD sign controlled intersections at three-way intersections). At such intersections, drivers on the minor street are forced to use judgment when selecting gaps in the major flow through which to execute crossings or turning maneuvers. Thus, the capacity of the controlled legs of an intersection is based on three factors:

1. The distribution of gaps in the major street traffic stream.

2. Driver judgment in selecting gaps through which to execute their desired maneuvers.

3. Follow-up time required to move into the front-of-queue position.

The level of service criterion for two-way STOP controlled intersections is somewhat different from the criterion used for signalized intersections. The primary reason for this is the difference that drivers expect a signalized intersection to carry higher traffic volumes than unsignalized

7.2.c
Packet Pg. 785 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Zacharias Master Plan Project
Transportation Administrative Draft EIR

3.14-4 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx
intersections. Additionally, several driver behavior conditions combine to make delays at signalized intersections less onerous than at unsignalized intersections.

The HCM provides procedures for calculating LOS on the minor street approaches and individual movements. It does not specify how a City must utilize that information. Depending on the availability of gaps, the minor approach might be operating at LOS D, E, or F while the overall intersection operates at LOS C or better. A minor approach that operates at LOS D, E, or F does not automatically translate into a need for a traffic signal. A signal warrant would still need to be met.

There are many instances where only a few vehicles are experiencing LOS D, E, or F on the minor approach while the whole intersection operates at an acceptable LOS. A signal is usually not warranted under such conditions.

Table 3.14-2 summarizes the relationship between delay and LOS for unsignalized intersections. At side-street stop-controlled intersections, the delay is calculated for each stop-controlled movement, the left-turn movement from the major street, as well as the intersection average. The intersection average delay and highest movement/approach delay are reported for side street stop-controlled intersections.

Table 3.14-2: Unsignalized Intersection LOS Criteria
LOS Driver’s Perception and Traffic Operation Description Delay in Seconds A Operations with very low delay occurring with favorable Progression and/or short cycle length.
< 10
B Operations with low delay occurring with good progression and/or short cycle lengths.
> 10–20
C Operations with average delays resulting from fair progression and/or longer cycle lengths. Individual cycle failures begin to appear. > 20–35
D Operations with longer delays due to a combination of unfavorable progression, long cycle lengths, or high volume-to-capacity (V/C) ratios. Many vehicles stop, and individual cycle failures are noticeable.
> 35–55
E Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences.

This is considered to be the limit of acceptable delay. > 55–80
F Operation with delays unacceptable to most drivers occurring due to over saturation, poor progression, or very long cycle lengths. > 80
Source: AMG, 2020.

The City of Patterson Guidelines for Traffic Impact Studies generally defines acceptable citywide unsignalized intersection operations as LOS D (35 seconds of delay per vehicle) or better during the morning and evening peak periods.

7.2.c
Packet Pg. 786 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Administrative Draft EIR Transportation
FirstCarbon Solutions 3.14-5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx
Significance Standards
City Standards
The following is the City’s criteria of significance to determine the potential impacts associated with a proposed project or action:

The City’s 2010 General Plan, Policy III.A.2 states that “The City shall endeavor to maintain a Level of Service (LOS) “D”, as defined by the 2000 Highway Capacity Manual (HCM) or subsequent revisions, on all streets and intersections within the City.”
County and Caltrans Standards
The minimum acceptable level of service standard for Stanislaus County roadway segments is LOS C.

Therefore, this report uses LOS C as the minimum acceptable standard and mitigation measures are recommended where service levels are below LOS C along roadways within Stanislaus County.

Facilities under the jurisdiction of Caltrans include freeway segments, ramps, ramp terminals, and arterials. Although Caltrans has not designated a LOS standard, Caltrans’ Guide for the Preparation of Traffic Impact Studies (December 2002) indicates attempts to maintain LOS of a State highway facility between the LOS “C/D” threshold. When existing State highway facilities are operating at higher levels of service than noted above, 20-year forecasts or general plan build-out analysis for the facility should be considered to establish equitable project contributions to local development impact fee programs that address cumulative traffic impacts.

Existing Traffic Conditions
Intersections
To accurately model the traffic condition, AMG created a Synchro traffic analysis model to determine the intersection LOS. The Existing Conditions traffic operations were evaluated based on levels of service criteria using Synchro. The macroscopic simulation model, Synchro, was used to evaluate several measures (such as lane geometries, signal optimization, signal phasing and traffic control) at the study intersections. The results of the LOS analysis for the existing intersections are shown in Table 3.14-3.

Table 3.14-3: Existing LOS of Study Intersections
# Intersection Existing Control
AM PM
Delay LOS Delay LOS
1 Sperry Avenue/I-5 SB Off-Ramps One-Way Stop 9.4 A 23.7 C 2 Sperry Avenue/I-5 NB On-Ramps One-Way Stop 10.5 B 15.2 B 3 Sperry Avenue/Rogers Road Signal 14.8 B 12.9 B
4 Sperry Avenue/Park Center Drive Signal 10.1 B 12.2 B
5 Sperry Avenue/Baldwin Road Signal 17.7 B 17.9 B
6 Sperry Avenue/American Eagle Drive Signal 18.3 B 13.7 B 7 Sperry Avenue/Ward Avenue Signal 27.4 C 25.6 C

7.2.c
Packet Pg. 787 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Zacharias Master Plan Project
Transportation Administrative Draft EIR

3.14-6 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx
# Intersection Existing Control
AM PM
Delay LOS Delay LOS
8 Sperry Avenue/S Del Puerto Avenue Signal 8.0 A 7.5 A
9 Sperry Avenue/SR-33 Two-Way Stop 37.8 E 35.6 E
10 Walnut Avenue/M Street/SR-33 Signal 21.9 C 19.2 B
11 SR-33/Las Palmas Avenue Signal 15.3 B 14.9 B
12 Olive Avenue/SR-33 Two-Way Stop 19.4 C 18.1 C
13 Park Center/Keystone Pacific Parkway Two-Way Stop 10.2 B 12.7 B 14 Rogers Road/Keystone Pacific Parkway Two-Way Stop 10.7 B 11.2 B 15 Rogers Road/Zacharias Road Two-Way Stop 9.6 A 10.9 B 16 Baldwin Road/Zacharias Road All-Way Stop 8.0 A 7.8 A 17 Zacharias Road/SR-33 Two-Way Stop 10.7 B 13.0 B
18 Ward Avenue/SR-33 One-Way Stop 16.4 C 19.0 C
19 SR-33/Eucalyptus One-Way Stop 14.4 B 16.3 C
20 Baldwin Road/SR-33 One-Way Stop 17.5 C 18.8 C
21 Rogers Road/SR-33 One-Way Stop 18.3 C 36.5 E
22 Sycamore Avenue/Eucalyptus Two-Way Stop 10.0 A 10.2 B 23 Elm Avenue/Eucalyptus Avenue Two-Way Stop 10.0 A 9.7 A 24 Sycamore Avenue/Las Palmas Avenue Signal 16.2 B 16.4 B 25 Elm Avenue/Las Palmas Avenue Signal 11.1 B 11.6 B
26 Jennings Road/West Main Avenue One-Way Stop 29.6 D 27.5 D 29 SR-33/Grayson Road All-Way Stop 63.8 F 79.8 F
30 Marshall Road/Ward Avenue Two-Way Stop 8.7 A 8.8 A
31 SR-33/Marshall Road Two-Way Stop 11.0 B 11.4 B
32 SR-33/Crows Landing Road/Fink Road All-Way Stop 10.5 B 10.4 B Notes:

Intersections 26 and 27 do not currently exist.

Source: AMG, 2020.

All the intersections operate at acceptable LOS D or better, except four intersections below that operates at either LOS E or LOS F:

Sperry Avenue and I-5 Southbound Ramps
Sperry Avenue and SR-33
Rogers Road and SR-33
SR-33 and Grayson Road

7.2.c
Packet Pg. 788 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Administrative Draft EIR Transportation
FirstCarbon Solutions 3.14-7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx
The I-5 Southbound off-ramp is currently stop control and it is the major gateway into the city from I5. All traffic at the southbound off-ramp needs to stop which contributes to LOS F condition. Very high left-turn volumes during the PM peak-hours from Sperry Avenue and Rogers Road contributed to the LOS E conditions respectively at the intersections of Sperry Avenue and SR-33 and Rogers Road and SR-33. A Project Report and Project Approval & Environmental Documentation (PA & ED) is currently underway and the final design is estimated to be completed by December 2019.3 Both intersections are currently stop controlled intersections and would operate at an acceptable LOS if signalized.

Roadways
Table 3.14-4 shows the arterial levels of service under existing conditions. Currently, all arterial segments operate acceptably during the AM and PM peak-hours.

Table 3.14-4: Existing Roadway Segment LOS
Link
ID Roadway Segment
Northbound/Eastbound Southbound/Westbound

AM PM AM PM
Speed LOS Speed LOS Speed LOS Speed LOS
A Sperry
Avenue
Rogers Road—Park Center
Drive

38.7 A 36.0 B 33.3 A 34.0 B
B Baldwin
Avenue
Sperry Avenue—Keystone
Pacific Parkway

34.1 A 33.9 A 21.3 C 18.4 D
C Ward
Avenue
Barch Avenue—Elfers Road 39.1 A 39.0 A 39.1 A 38.9 A
D West
Marshall
Road
Ward Avenue—SR-33 36.7 A 36.6 A 36.7 A 36.7 A
E SR-33 South of Barch Avenue 37.7 A 35.1 B 38.2 A 34.8 B F Las Palmas
Avenue
Sycamore Avenue—Elm
Avenue

39.4 A 38.7 A 37.6 A 37.3 B
G Las Palmas
Avenue
Poplar Avenue—Jennings
Road

42.4 A 41.9 A 42.1 A 41.4 A
H SR-33 Walnut Avenue—Olive
Avenue-Ivy Avenue

35.8 B 35.7 B 27.8 C 28.5 C
I Eucalyptus
Avenue
SR-33—Sycamore Avenue 44.3 A 44.1 A 45.0 A 45.0 A
J Baldwin
Road
Zacharias Road—SR-33 45.8 A 45.9 A 43.7 A 43.7 A
K Zacharias
Road
Rogers Road—Baldwin Road 41.8 A 41.8 A 45.9 A 45.9 A
L Rogers Road Zacharias Road—SR-33 43.1 A 43.1 A 45.2 A 45.3 A

7.2.c
Packet Pg. 789 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Zacharias Master Plan Project
Transportation Administrative Draft EIR

3.14-8 FirstCarbon Solutions
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx
Link
ID Roadway Segment
Northbound/Eastbound Southbound/Westbound

AM PM AM PM
Speed LOS Speed LOS Speed LOS Speed LOS
M SR-33 Zacharias Road—Baldwin
Road

40.6 A 40.8 A 42.1 A 40.4 A
N SR-33 Grayson Road—Rogers Road 38.5 B 38.9 B 42.4 A 42.3 A O SR-33 Crows Landing Road—Fink
Road/Marshall Road

43.5 A 43.5 A 44.5 A 44.2 A
Source: AMG, 2020.

Freeways
The freeway levels of service under existing conditions are shown in Table 3.14-5. Currently, both freeway segments operate acceptably during the peak-hour.

Table 3.14-5: Existing Freeway Segment LOS
Link
ID Freeway Segment
Existing
# Lanes
AM PM
Volume
(vph)a
Density
(pc/mi/ln) LOS
Volume
(vph)
Density
(pc/mi/ln) LOS
Y I-5 NB (north of Sperry
Avenue)
2 1,335 11.6 B 1,508 13.4 B
I-5 SB (north of Sperry
Avenue)
2 1,227 12.1 B 1,806 18.5 C
Z I-5 NB (south of Sperry
Avenue)
2 1,100 10.0 A 1,408 13.5 B
I-5 SB (south of Sperry
Avenue)
2 1,089 9.8 A 1,397 13.6 B
Note:
a peak-hour volume obtained from online Caltrans Traffic Counts, 2017 Source: AMG, 2020.

Public Transit
The public transit system is provided by the Stanislaus Regional Transit (StaRT). The bus service provides local and regional connectivity for residents of Patterson. StaRT operates one fixed-route bus line (Route 40) that serves the City of Patterson, Grayson and Westley. This route operates from 5:15 a.m. and 9:12 p.m. on weekdays. Another fixed-route, Bus Line 45W, operates for Patterson, Turlock and Gustine. This route operates on weekdays from 5:37 a.m. and 9:21 p.m.

7.2.c
Packet Pg. 790 Attachment: 17900003 Baldwin-Zacharias Master Plan Draft EIR (Zacharias and Baldwin Ranch Master Plan Project) City of Patterson—Baldwin Master Plan / Zacharias Master Plan Project Administrative Draft EIR Transportation
FirstCarbon Solutions 3.14-9
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/1790/17900003/EIR/3 - Draft EIR/Client-DropBox submittal 112420/Word Documents - TRACKS/17900003 Sec03-14 Transportation.docx
Bicycles
Bicycle facilities are classified by Caltrans into four distinct types of bikeway facilities, as generally described below:

Class I Bikeway (Bike Path). Provides a completely separate right-of-way and is designated for the exclusive use of bicycles and pedestrians with vehicle and pedestrian cross-flow minimized.

Class II Bikeway (Bike Lane). Provides a restricted right-of-way and is designated for the use of bicycles with a striped lane on a street or highway. Vehicle parking and vehicle/pedestrian crossflow are permitted.

Class III Bikeway (Bike Route). Provides for a right-of-way designated by signs or pavement markings for shared use with pedestrians or motor vehicles.

Class IV Bikeway (Separated Bikeway/Cycle Track). Provides a cycle track or protected bike lane, is for the exclusive use of bicycles, physically separated from motor traffic with a vertical feature.

The Class II facilities are generally found along the downtown portion of the existing urbanized area.

These facilities are found along parts of Las Palmas Avenue, Baldwin Road, American Eagle and ‘M’ Street.

The Class III Bike Route network is most prevalent in the Central Patterson area. However, there are gaps in the bike routes. Because of these gaps, it is difficult to fully traverse the city traveling north to south or east to west using the designated bicycle network.

Rail
Freight
The California Northern Railroad operates freight trains through Patterson, parallel to SR-33. The line connects Tracy and Los Banos, with multiple rail connections to local industries. The Union Pacific Railroad owns the tracks. Currently, there is one daily round trip train between Tracy and Los Banos through Patterson.

← All documents from this meeting