Cities Index.
Agenda packet

Pinole City Council
August 20, 2024

Document
Agenda packet
Meeting
August 20, 2024
Body
Pinole City Council
Pages
945
Original file
114.0 MB
Text extracted from the city's file for reading and search. Open the original on pinoleca.api.civicclerk.com. That file is the official record.

CITY COUNCIL
Maureen Toms, Mayor
Cameron Sasai, Mayor Pro Tem
Anthony Tave, Council Member
Norma Martínez-Rubin, Council Member
Devin T. Murphy, Council Member

PINOLE CITY COUNCIL

MEETING AGENDA
August 20, 2024
5:00 PM
Attend in Person: PINOLE CITY COUNCIL CHAMBERS - 2131 PEAR STREET OR *HYATT REGENCY - 151 EAST WACKER DRIVE, CHICAGO, IL (TELECONFERENCE - COUNCILMEMBER MURPHY) OR
Attend VIA ZOOM TELECONFERENCE – Details provided below How to Submit Public Comments:

In Person:

Attend meeting at the Pinole City Council Chambers, fill out a yellow public comment card and submit it to the City Clerk.

Via Zoom:

Members of the public may submit a live remote public comment via Zoom video conferencing. Download the Zoom mobile app from the Apple Appstore or Google Play. If you are using a desktop computer, you can test your connection to Zoom by clicking here. Zoom also allows you to join the meeting by phone.

From a PC, Mac, iPad, iPhone or Android:
https://us02web.zoom.us/j/89335000272
Webinar ID: 893 3500 0272
By phone: +1 (669) 900-6833 or +1 (253) 215-8782 or +1 (346) 248-7799 • Speakers will be asked to provide their name and city of residence, although providing this is not required for participation.
• Each speaker will be afforded up to 3 minutes to speak (subject to modification by the Mayor) • Speakers will be muted until their opportunity to provide public comment.

When the Mayor opens the comment period for the item you wish to speak on, please use the “raise hand” feature (or press *9 if connecting via telephone) which will alert staff that you have a comment to provide and press *6 to unmute. To comment with your video enabled, please let the City Clerk know you would like to turn your camera on once you are called to speak.

Written Comments:

All comments received before 3:00 pm the day of the meeting will be posted on the City’s website on the agenda page (Agenda Page Link) and provided to the City Council prior to the meeting. Written comments will not be read aloud during the meeting. Email comments to [email protected] Please indicate which item on the agenda you are commenting on in the subject line of your email.

Page 1 of 945 ends

City Council
Agenda - August 20, 2024

Page 2 ends

OTHER WAYS TO WATCH THE MEETING
LIVE ON CHANNEL 26. They are retelecast the following week. The Community TV Channel 26 schedule is published on the city’s website at www.ci.pinole.ca.us.

VIDEO-STREAMED LIVE ON THE CITY’S WEBSITE, www.ci.pinole.ca.us and remain archived on the site for five (5) years.

If none of these options are available to you, or you need assistance with public comment, please contact the City Clerk, Heather Bell at (510) 724-8928 or [email protected]..

Americans With Disabilities Act: In compliance with the Americans With Disabilities Act of 1990, if you need special assistance to participate in a City Meeting or you need a copy of the agenda, or the agenda packet in an appropriate alternative format, please contact the City Clerk’s Office at (510) 724-8928. Notification at least 48 hours prior to the meeting or time when services are needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service.

Note: Staff reports are available for inspection on the City Website at www.ci.pinole.ca.us. You may also contact the City Clerk via e-mail at [email protected].

Ralph M. Brown Act. Gov. Code § 54950. In enacting this chapter, the Legislature finds and declares that the public commissions, boards and councils and the other public agencies in this State exist to aid in the conduct of the people's business. It is the intent of the law that their actions be taken openly and that their deliberations be conducted openly. The people of this State do not yield their sovereignty to the agencies, which serve them. The people, in delegating authority, do not give their public servants the right to decide what is good for the people to know and what is not good for them to know. The people insist on remaining informed so that they may retain control over the instruments they have created.

Page 2 of 945 ends

City Council
Agenda - August 20, 2024

Page 3 ends

1. CALL TO ORDER & PLEDGE OF ALLEGIANCE IN HONOR OF THE US MILITARY TROOPS

2. LAND ACKNOWLEDGMENT
Before we begin, we would like to acknowledge the Ohlone people, who are the traditional custodians of this land. We pay our respects to the Ohlone elders, past, present, and future, who call this place, Ohlone Land, the land that Pinole sits upon, their home. We are proud to continue their tradition of coming together and growing as a community. We thank the Ohlone community for their stewardship and support, and we look forward to strengthening our ties as we continue our relationship of mutual respect and understanding.

3. ROLL CALL, CITY CLERK’S REPORT & STATEMENT OF CONFLICT An official who has a conflict must, prior to consideration of the decision: (1) publicly identify in detail the financial interest that causes the conflict; (2) recuse himself /herself from discussing and voting on the matter; and (3) leave the room until after the decision has been made, Cal. Gov't Code § 87105.

4. CONVENE TO A CLOSED SESSION
Citizens may address the Council regarding a Closed Session item prior to the Council adjourning into the Closed Session, by first providing a speaker card to the City Clerk.

A. CONFERENCE WITH LABOR NEGOTIATORS
Gov. Code § 54957.6
Agency designated representatives: City Attorney Eric Casher Unrepresented employee: Interim City Manager
B. PUBLIC EMPLOYEE PERFORMANCE EVALUATION
Gov. Code § 54957
Title: Interim City Manager

5. RECONVENE IN OPEN SESSION TO ANNOUNCE RESULTS OF CLOSED SESSION

6. CITIZENS TO BE HEARD (Public Comments)
Citizens may speak under any item not listed on the Agenda. The time limit is 3 minutes and is subject to modification by the Mayor. Individuals may not share or offer time to another speaker. Pursuant to provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The City Council may direct staff to investigate and/or schedule certain matters for consideration at a future Council meeting. PLEASE SEE THE COVERSHEET OF THE

AGENDA FOR INSTRUCTIONS ON HOW TO SUBMIT PUBLIC COMMENTS

7. REPORTS & COMMUNICATIONS
A. Mayor Report

1. Announcements
B. Mayoral & Council Appointments
C. City Council Committee Reports & Communications
D. Council Requests for Future Agenda Items
E. City Manager Report / Department Staff

Page 3 of 945 ends

City Council
Agenda - August 20, 2024

Page 4 ends

F. City Attorney Report

8. RECOGNITIONS / PRESENTATIONS / COMMUNITY EVENTS
A. Proclamations

1. Recognizing City Council Interns Phoebe Deza and Ileana Miranda B. Presentations

1. Sales Tax Ballot Measure Update

2. City Council Intern Program

9. CONSENT CALENDAR
All matters under the Consent Calendar are considered to be routine and noncontroversial. These items will be enacted by one motion and without discussion. If, however, any interested party or Council member(s) wishes to comment on an item, they may do so before action is taken on the Consent Calendar. Following comments, if a Council member wishes to discuss an item, it will be removed from the Consent Calendar and taken up in order after adoption of the Consent Calendar.

A. Approve the Minutes of the Regular City Council Meeting on August 6, 2024.

B. Receive the August 3, 2024 – August 16, 2024– List of Warrants in the Amount of $745,406.52 and the August 16, 2024 Payroll in the amount of $520,218.81.

C. Letter of Concern Regarding Proposed Scotts Valley Mega Casino and Tribal Housing Project in Solono County Action: Consider Approval of Letter per Staff Recommendation (Heather Bell)
D. Issue Letter of Support for the City of Pinole and Richmond Community Foundation’s Application to the Partnership for the Bay's Future Policy Fund Grant (Cohort 3) Action:

Approve Letter of Support per Staff Recommendation (Lilly Whalen)

10. PUBLIC HEARINGS
Citizens wishing to speak regarding a Public Hearing item should fill out a speaker card prior to the completion of the presentation, by first providing a speaker card to the City Clerk. An official who engaged in an ex parte communication that is the subject of a Public Hearing must disclose the communication on the record prior to the start of the Public Hearing.

A. Extension of Entitlements for Pinole Vista Project 223-units 1500 Fitzgerald, ROIC Development Action: Conduct a Public Hearing and Adopt Resolution per Staff Recommendation (David Hanham)

11. OLD BUSINESS
A. Approve Resolutions Adopting an Initial Study-Negative Declaration (IS-ND) for the CAAP and Adopting Pinole's inaugural Climate Action and Adaptation Plan (CAAP) Action: Adopt Resolutions per Staff Recommendation (Kapil Amin, Lilly Whalen)

12. NEW BUSINESS
A. Receive a report on Energy Conservation, Generation and Storage Assessment (CIP

Page 4 of 945 ends

City Council
Agenda - August 20, 2024

Page 5 ends

PROJECT # IN2201) Action: Adopt Resolution per Staff Recommendation (Sanjay Mishra)
B. Receive a report on Municipal Broadband Feasibility Study Report (CIP# IN2102) Action:

Receive Report and Provide Direction (Sanjay Mishra)

13. CITIZENS TO BE HEARD (Continued from Item 6) (Public Comments) Open only to members of the public who did not speak under the first Citizens to Be Heard, Agenda Item 6 Citizens may speak under any item not listed on the Agenda. The time limit is 3 minutes for City Council items and is subject to modification by the Mayor. Individuals may not share or offer time to another speaker.

Pursuant to provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The City Council may direct staff to investigate and/or schedule certain matters for consideration at a future meeting.

14. ADJOURNMENT to the Regular City Council Meeting of September 3, 2024 in Remembrance of Amber Swartz.

I hereby certify under the laws of the State of California that the foregoing Agenda was posted on the bulletin board at the main entrance of Pinole City Hall, 2131 Pear Street Pinole, CA, and on the City’s website, not less than 72 hours prior to the meeting date set forth on this agenda. _______________________
Heather Bell, CMC
City Clerk
POSTED: Thursday, August 15, 2024 at 4:00 pm
*Revised to Include Teleconference Location for Councilmember Murphy: Reposted on Friday, August 16 at 2:30 p.m

Page 5 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 1 ends

CITY COUNCIL MEETING

MINUTES
August 6, 2024

1. CALL TO ORDER & PLEDGE OF ALLEGIANCE IN HONOR OF THE US MILITARY TROOPS
The City Council Meeting was held in a hybrid format (in-person and via Zoom videoconference and broadcast) from the Pinole Council Chambers, 2131 Pear Street, Pinole, California. Mayor Toms called the Regular Meeting of the City Council to order at 5:00 p.m. and led the Pledge of Allegiance.

2. LAND ACKNOWLEDGEMENT
Before we begin, we would like to acknowledge the Ohlone people, who are the traditional custodians of this land. We pay our respects to the Ohlone elders, past, present and future, who call this place, Ohlone Land, the land that Pinole sits upon, their home. We are proud to continue their tradition of coming together and growing as a community. We thank the Ohlone community for their stewardship and support, and we look forward to strengthening our ties as we continue our relationship of mutual respect and understanding.

3. ROLL CALL, CITY CLERK’S REPORT & STATEMENT OF CONFLICT An official who has a conflict must, prior to consideration of the decision; (1) publicly identify in detail the financial interest that causes the conflict; (2) recuse himself/herself from discussing and voting on the matter; and (3) leave the room until after the decision has been made, Cal. Gov.

Code § 87105.

A. COUNCILMEMBERS PRESENT
Maureen Toms, Mayor
Cameron Sasai, Mayor Pro Tem
Norma Martinez-Rubin, Council Member
Anthony Tave, Council Member

COUNCILMEMBERS ABSENT
Devin Murphy, Council Member
B. STAFF PRESENT
Neil Gang, Interim City Manager/Chief of Police
Heather Bell, City Clerk
Eric Casher, City Attorney
City Clerk Heather Bell announced the agenda had been posted on August 1, 2024, at 12:30 p.m. with all legally required written notices. Written comments had been received in advance of the meeting, distributed to the City Council and staff, posted to the City website and made available to the public in the Council Chambers.

Page 6 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 2 ends

Following an inquiry, the Council reported there were no conflicts with any items on the agenda.

4. CONVENE TO A CLOSED SESSION:

Citizens may address the Council regarding a Closed Session item prior to the Council adjourning into the Closed Session, by first providing a speaker card to the City Clerk.

A. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Gov. Code §54956.9(d)(4)
In re National Prescription Opiate Litigation, No. 1:17-MD-2804

PUBLIC COMMENTS OPENED
City Clerk Bell reported there were no comments from the public.

PUBLIC COMMENTS CLOSED

5. RECONVENE IN OPEN SESSION TO ANNOUNCE RESULTS OF CLOSED SESSION At 5:47 p.m., Mayor Toms reconvened the meeting into open session. There was no reportable action from the Closed Session.

6. CITIZENS TO BE HEARD (Public Comments)
Citizens may speak under any item not listed on the Agenda. The time limit is 3 minutes and is subject to modification by the Mayor. Individuals may not share or offer time to another speaker.

Pursuant to provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The City Council may direct staff to investigate and/or schedule certain matters for consideration at a future Council meeting.

City Clerk Bell reported there were no Citizens to be Heard.

7. REPORTS & COMMUNICATIONS
A. Mayor Report

1. Announcements:

Mayor Toms reported the City of Pinole hosted the West County Mayors’ and Supervisors’ meeting and would host the group for the next six months. During the meeting, the City of San Pablo expressed concern with a mega-casino proposal in the City of Vallejo and the group discussed the East Bay Hills Wildfire Coalition’s need for a fiscal agent, and the City of Pinole was asked to take on the task, which would be considered when the new City Manager came on board. She had also attended the Association of Bay Area Governments (ABAG) Executive Board meeting with the members of the General Assembly having been thanked for convening on June 21, 2024. It was also reported in late June/early July that the San Francisco Estuary Partnership received two awards from the Environmental Protection Agency (EPA) totaling $10.6 million to implement watershed scale restoration in North Richmond and advance nature-based adaptation along the Hayward Shoreline.

Page 7 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 3 ends

A report was also provided on a $20 billion Bay Area Affordable Housing Bond which had been approved for the 2024 election for affordable housing throughout the nine county Bay Area, and an update on the Metropolitan Transportation Commission (MTC) proposal Plan Bay Area 2050+, an update to Plan Bay Area 2050. In addition, Mayor Toms reported she met with the new Principal of Pinole Valley High School who had been invited to a future City Council meeting to introduce himself.

B. Mayoral & Council Appointments: None
C. City Council Committee Reports & Communications: None D. Council Requests for Future Agenda Items
Mayor Toms offered a motion to send a letter to the Bureau of Indian Affairs by August 22, 2024, to extend the City of San Pablo’s concerns about a mega-casino project proposed by the City of Vallejo, as a future agenda item.

On the motion and in response to Council member Martinez-Rubin, Mayor Toms explained the City Council would next meet on August 20, 2024, there was time to consider the item and there was a standard letter that could be considered at the next City Council meeting.

Consensus given.

PUBLIC COMMENTS OPENED
Irma Ruport referenced an article about the new Executive Director for Contra Costa County Animal Services. She asked that the City Council extend an invitation to the Executive Director to provide an update to the City Council and the public on the City’s contract with the County given issues with the lack of animal services in West County.

Consensus given.

PUBLIC COMMENTS CLOSED
E. City Manager Report / Department Staff
Interim City Manager Neil Gang reported the National Night Out Caravan for the Pinole Police Department would go to three different locations in the City to celebrate the event with a caravan planned on August 6, 2024. A Citywide National Night Out had been planned for October 1, 2024.

He also reported the new City website was operational at pinole.gov and he expressed his appreciation to Assistant to the City Manager Fiona Epps and her team for their hard work. The City’s new Online Permitting, Inspection and Licensing System was also now live online and new City Manager Kelcey Young would start on August 26, 2024.

In addition, the Police Chief recruitment process was ongoing with a total of 14 applications received, seven of which involved current or former Police Chiefs. Six external candidates had been selected to move forward to interviews scheduled for August 26, 2024.

Page 8 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 4 ends

Interviews would include three panels; a Community Panel, City Department Head Panel and Police Chiefs from around the state. Once finalists had been identified the City Manager would hold interviews on-site on September 5, 2024.

Public Works Director Sanjay Mishra provided an update on Public Works Operations and Activities for the month of July. There had been a total of 173 service requests; 33 for facilities, 88 for parks and 26 for roads, with one emergency call-out. The details for the service requests were highlighted. Public Works Department staff also provided assistance at various special events during the month including stormwater cleaning events for inlets. He also reported that the Public Works Department was struggling with staffing, with about 60 percent of staff currently out sick.

Mayor Toms thanked the Public Works Director for the repair work on Doidge Avenue and reported there were many grateful residents.

F. City Attorney Report: None
PUBLIC COMMENTS OPENED (Items 7D through 7F)
Irma Ruport asked the Interim City Manager/Police Chief why he was recruiting and hiring for the new Police Chief position and asked who would do the direct hiring of the new Police Chief.

Interim City Manager/Police Chief Gang reported the City Manager was the hiring authority for the Police Chief, and the new City Manager would do the hiring for the new Police Chief when she arrived.

Ms. Ruport commented the City had an Interim City Manager/Police Chief for the past six months.

She found it inappropriate for the Interim City Manager/Police Chief and the new City Manager to be the only ones hiring the new Police Chief. She objected to the process, questioned having someone new on staff who was not familiar with Pinole doing the hiring and asked the City Attorney to opine. She pointed out the City Council was elected to represent the City and had the knowledge of the City. As a long-time resident and given there had been bad practices in hiring in the past, she asked that people be vetted properly.

Mayor Toms reported a panel had reviewed applicants and there were six finalists to be interviewed by three different panels as earlier described who would provide the recommendation to the new City Manager who would interview and make that hire. The City Council directly hired the City Manager, City Attorney and City Clerk. The rest of the Department Heads were hired by the City Manager.

PUBLIC COMMENTS CLOSED

9. CONSENT CALENDAR
All matters under the Consent Calendar are considered to be routine and noncontroversial. These items will be enacted by one motion and without discussion. If, however, any interested party or Council member(s) wishes to comment on an item, they may do so before action is taken on the Consent Calendar. Following comments, if a Council member wishes to discuss an item, it will be removed from the Consent Calendar and taken up in order after adoption of the Consent Calendar.

Page 9 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 5 ends

A. Approve the Minutes of the Regular City Council Meeting on July 16, 2024.

B. Receive the July 13, 2024 – August 2, 2024 List of Warrants in the Amount of $3,399,653.34, the July 19, 2024 Payroll in the Amount of $536,674.41, and the August 2, 2024 Payroll in the Amount of $523,367.72.

C. Overview of Current Notification Process for Ministerial and Discretionary Projects.

Action: Receive Report per Staff Recommendation (David Hanham) D. Award a Contract for Architectural Services for FA1702-Citywide Roof Repairs and Replacement and FA1703-City Hall Modernization Projects to Interactive Resources, Inc. in an Amount Not to Exceed $270,555. Action: Adopt Resolution per Staff Recommendation (Sanjay Mishra)
E. Adopt Final Sewer Rate Study and Authorize Sewer Rate for Tax Roll. Action:

Adopt Resolution per Staff Recommendation (Sanjay Mishra) Mayor Pro Tem Sasai asked that Item 9D be removed for a separate vote.

City Clerk Bell requested a revision to Item 9A, Page 35 of 128 of the agenda packet, and the first sentence of the comments made by Rafael Menis, as follows:

Rafael Menis supported the proposed half cent sales tax measure, the City needed the revenue it would raise, the protections state law required limited it from being applied to regressive categories, such as food and medicine, making it a less regressive tax and given the relative popularity of the tax as compared to others based on the City’s survey data, made it the best choice for the City at this time.

Council member Martinez-Rubin requested Item 9C be removed for discussion.

PUBLIC COMMENTS OPENED
City Clerk Bell reported there were no comments from the public.

PUBLIC COMMENTS CLOSED
ACTION: Motion by Council member Tave/Mayor Pro Tem Sasai to adopt Items 9A, as amended and Items 9B and 9E, as shown.

Vote: Passed 4-0-1
Ayes: Toms, Sasai, Martinez-Rubin, Tave
Noes: None
Abstain: None

Absent: Murphy
Speaking to Item 9C, Council member Martinez-Rubin thanked Planning Manager David Hanham and the Planning Department for the information she had requested as part of Item 9C, which helped to explain the process staff, the Planning Commission and the public went through from the submittal of an application to the development of a project.

Page 10 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 6 ends

Council member Martinez-Rubin urged residents to read the report to understand the different distinctions about projects and what was permitted by law and she highlighted some of the existing regulations.

ACTION: Motion by Council members Martinez-Rubin/Tave to adopt Item 9C, as shown.

Vote: Passed 4-0-1
Ayes: Toms, Sasai, Martinez-Rubin, Tave
Noes: None
Abstain: None

Absent: Murphy
Referring to Item 9D, Council member Tave explained he removed the item to ask that it be tabled to allow the new City Manager to review the Capital Improvement Plan (CIP) in its entirety and the costs related to Item 9D. He had spoken with the Public Works Director about tabling the item and the potential impacts on projects moving forward. He asked the Public Works Director to opine on tabling the item.

Public Works Director Mishra detailed the architectural services contract the City had procured through the Request for Proposal (RFP) process as part of Item 9D. If the City Council decided to hold off on the item for a couple of weeks he did not see that as a concern.

Council member Tave emphasized he would like to see the item be tabled, as discussed.

Mayor Toms asked the Public Works Director how long the quote for the scope of work for Item 9D would be valid.

Public Works Director Mishra advised the quote was valid for 120-days from the time of the bid.

PUBLIC COMMENTS OPENED
Rafael Menis referenced Page 92 of 128 of the agenda packet and the details for the construction cost estimate, which read in part: The current estimates appear to cover only 70-80% of the market cost for the roof areas the City wants to replace. He asked whether there were sufficient funds set aside for the full project cost not just the construction costs.

Irma Ruport asked that Item 9D be continued to a future meeting given that the review and analysis in the report was incomplete. A total of six proposals had been received in response to the RFP on May 21, 2024, and had been evaluated with three proposals shortlisted. The top ranked proposal involved an interview by City staff based on the scope of the RFP. The proposal from Interactive Resources, Inc. was in the amount of $270,555. She asked why all three candidate proposals had not been interviewed, why all three had not been listed in the resolution as done with prior resolutions, who on staff had interviewed the consultant and whether staff had done enough follow-up and background history with the consultant. Based on her own research, she had learned on June 19, 2018 that the City executed a contract with Interactive Resources, Inc. for $100,000 to design improvements required for the Faria House to serve as a public museum and had consulted with staff and representatives from the Pinole History Museum to create the building programs with an estimate for construction costs in January 2020 at $1.4 million.

Page 11 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 7 ends

Ms. Ruport noted the contract for the project had been approved by the five Council members at the time and no RFP had been distributed, and there had been only four informal emails involved when one consultant had been chosen, Interactive Resources Inc. In that case, the City paid the cost but the project had been shelved since the City did not have any money. She expressed concern the current RFP process had repeated itself with the same past procedures and had not followed the RFP rules. She asked that Item 9D be continued until the new City Manager was on board, the item was not time sensitive and the City needed to do better following the rules and guidelines to ensure all information was given to the public who would be paying for the project.

Ms. Ruport was concerned the City was repeating bad hiring practices by hiring former bad consultants with no accounting or records. She added every time she requested records the City did not have them. She stated she would be making a Public Records Act (PRA) request in this instance.

PUBLIC COMMENTS CLOSED
ACTION: Motion by Council members Tave/Mayor Toms to continue Item 9D until the new City Manager had the chance to review.

Vote: Passed 3-0-2
Ayes: Toms, Martinez-Rubin, Tave
Noes: None
Abstain: Sasai

Absent: Murphy

10. PUBLIC HEARINGS
A. Conduct Public Hearing and Adopt a Resolution Confirming the Assessments and Ordering the Levy for the Pinole Valley Road Landscape and Lighting Assessment District (LLAD) for Fiscal Year 2024/2025. Action: Conduct Public Hearing and Adopt Resolution per Staff Recommendation (Sanjay Mishra) Public Works Director Mishra provided a brief PowerPoint presentation on the Pinole Valley Road Landscape and Lighting Assessment District public hearing process and highlighted the Assessment Report for Fiscal Year 2024/25, which included a correction to the Total Assessable Costs for Zones A and B.

Public Works Director Mishra recommended the City Council adopt a resolution confirming the assessment and diagram as described in the Annual Assessment Report, levying an assessment for the fiscal year commencing July 1, 2024, and ending June 30, 2025, and ordering the City Engineer to prepare and submit the assessments to the Contra Costa County Assessor’s Office for placement onto the Fiscal Year 2024/2025 secured property tax roll.

Council member Martinez-Rubin asked about the reference to maintenance of “one and a half traffic signals” on Pinole Valley Road, to which Public Works Director Mishra explained that a portion of the cost had been assigned to Zone A and the other to Zone B, and was not a separation of one and a half traffic signals.

PUBLIC HEARING OPENED

Page 12 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 8 ends

City Clerk Bell reported there were no comments from the public.

PUBLIC HEARING CLOSED
ACTION: Motion by Council members Tave/Martinez-Rubin to adopt a resolution confirming the assessment and diagram as is described in the Annual Assessment Report, levying an assessment for the fiscal year commencing July 1, 2024, and ending June 30, 2025, and ordering the City Engineer to prepare and submit the assessments to the Contra Costa County Assessor’s Office for placement onto the Fiscal Year 2024/2025 secured property tax roll.

Vote: Passed 4-0-1
Ayes: Toms, Sasai, Martinez-Rubin, Tave
Noes: None
Abstain: None

Absent: Murphy

12. NEW BUSINESS: None

13. CITIZENS TO BE HEARD (Continued from Item 6) (Public Comments) Only open to members of the public who did not speak under the first Citizens to be Heard, Agenda Item 6.

Citizens may speak under any item not listed on the Agenda. The time limit is 3 minutes and is subject to modification by the Mayor. Individuals may not share or offer time to another speaker.

Pursuant to provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The City Council may direct staff to investigate and/or schedule certain matters for consideration at a future Council meeting.

Rafael Menis reported on the COVID-19 rate in the community, local sewer water sheds and hospitalization rates with an overall rate of 17 per 100,000 in terms of viral activity levels. He continued to encourage people to wear masks in high risk crowded indoor areas, take precautions as necessary and get booster shots. He also wished Council member Murphy a Happy Birthday and praised his work on the City Council over the last few years including having played a significant role in reopening Fire Station 74, ensuring the City had gone through many of the core strategic planning processes, working to ensure the City had a proper economic development process and ensure there was greater public communication, outreach and community engagement through various tools. He thanked Council member Murphy for his work to engage the community and his continued work on the City Council.

Anthony Vossbrink reported the presentation provided by the Public Works Director for Item 10A was not clearly audible and the text not clearly visible and he asked that those issues be corrected for future presentations. He otherwise noted there remained a number of street light issues in the community including street light outages along Pinole Valley Road, San Pablo Avenue and a third of the public parking lot lights were inoperable creating a safety hazard. He asked that the different parking lots in the City be reviewed prior to waiting for the new City Manager to come on board. Also, two large directional lights on the I-80 overpass were inoperable and green recyclable trash cans in the barbeque grove and dog park remained to be installed.

Page 13 of 945 ends

Pinole City Council Regular Meeting
Minutes – August 6, 2024

Page 9 ends

Mayor Toms asked that the meeting adjourn in memory of Scott Davidson, a former Contract Planner for the City of Pinole.

14. ADJOURNMENT to the Regular Meeting of August 20, 2024 in Remembrance of Amber Swartz and Scott Davidson.

At 6:32 p.m., Mayor Toms adjourned the meeting to the Regular City Council Meeting of August 20, 2024 in Remembrance of Amber Swartz and Scott Davidson.

Submitted by:
_________________________________
Heather Bell, CMC
City Clerk
Approved by City Council:

Page 14 of 945 ends
Page 15 of 945 ends
Page 16 of 945 ends
Page 17 of 945 ends
Page 18 of 945 ends
Page 19 of 945 ends
Page 20 of 945 ends
Page 21 of 945 ends
Page 22 of 945 ends
Page 23 of 945 ends
Page 24 of 945 ends
Page 25 of 945 ends
Page 26 of 945 ends
Page 27 of 945 ends

CITY COUNCIL
REPORT 9.C.

DATE: AUGUST 20, 2024
TO: MAYOR AND COUNCIL MEMBERS
FROM: HEATHER BELL, CITY CLERK
SUBJECT: LETTER OF CONCERN REGARDING PROPOSED SCOTTS VALLEY MEGA

CASINO AND TRIBAL HOUSING PROJECT IN SOLONO COUNTY

RECOMMENDATION
Staff recommends that the City Council consider approving the letter of concern regarding the proposed Scotts Valley Mega Casino and Tribal Housing Project in Solono County.

BACKGROUND
At the City Council meeting on August 6, 2024, Mayor Toms requested a future agenda item for the City Council to approve a letter to send to the Bureau of Indian Affairs by August 22, 2024. The City Council gave its consensus to direct staff to prepare the item for review at the August 20th City Council meeting.

REVIEW AND ANALYSIS
The City of San Pablo, through its staff and elected representatives, has requested support from its regional partners to send a letter of concern to the Bureau of Indian Affairs by August 22, 2024 the deadline for public review for the proposed casino project. A sample letter of concern is included as an attachment to this staff report for the City Council's review and consideration. The letter provides comment and expresses concern regarding the Environmental Assessment (EA) document review process as well as potential regional and socio-economical impacts of the project.

Also included as an attachment is a similar letter of concern regarding the project that was sent by the Contra Costa County Board of Supervisors to the Department of the Interior for additional reference.

Should the City Council approve the letter of concern, staff will facilitate signature by the Mayor and the letter will be sent to the U.S. Department of the Interior and the Pacific Regional Office of the Bureau of the Indian Affairs with a copy to Senators Padilla and Butler, Representative John Garamendi and the San Pablo City Council.

FISCAL IMPACT
There is no fiscal impact.

ATTACHMENTS

Page 28 of 945 ends

A. Draft Sample Letter
B. Contra Costa County Board of Supervisors - Letter of Concern

Page 29 of 945 ends

DRAFT SAMPLE LETTER TO US DEPT OF INTERIOR AND BIA OFFICIALS August_____, 2024
The Honorable Deb Haaland
Secretary
U.S. Department of the Interior
1849 C Street, NW
Washington, DC 20240
with copy to:

Amy Dutschke, Regional Director
Bureau of Indian Affairs, Pacific Regional Office
2800 Cottage Way, Room W-2820
Sacramento, CA 95825
Email: [email protected]; [email protected]
RE: CONCERNS REGARDING THE PROPOSED SCOTTS VALLEY MEGA CASINO AND

TRIBAL HOUSING PROJECT IN SOLANO COUNTY, VALLEJO, CA
Dear Secretary Haaland:

Please allow this letter to serve as a letter of comment and concern regarding the current Environmental Assessment (EA) document circulated on July 8, 2024 by the US Department of Interior / Bureau of Indian Affairs (BIA) officials to address the environmental impacts associated with the above mega Casino project, located in Solano County, City of Vallejo, CA under the National Environmental Policy Act (NEPA).

The City/County of _____________urges (BIA) officials to not expedite its public review of the current EA document without fully addressing and evaluating all significant environmental impacts of the proposed mega Casino project under an appropriate Environmental Impact Statement (EIS) under NEPA for the proposed project.

The City/County of _________, CA supports comments previously submitted by the City of San Pablo, CA on July 22, 2024 to BIA officials in addition to other comments expressed to BIA officials to date on their grave concerns over the lack of a full, comprehensive review of all associated environmental, socio-economic and environmental justice impacts associated with this proposed project in the EA document.

Since 1999, San Pablo has been the host community for the San Pablo Lytton Casino, owned and operated by the Lytton Rancheria Band of Pomo Indians, in West Contra Costa County which is located 16-miles from the proposed project site along the I-80 freeway corridor. The City of San Pablo and San Pablo Lytton Casino stem to lose significant annual Casino funds (i.e. -20% annual

Page 30 of 945 ends

reduction) which will pose a significant socio-economic and environmental justice impacts to this low-income and socio-disadvantaged community in West Contra Costa County region.

San Pablo’s current program and service delivery of local municipal services is at critical stake to its local residents, and surrounding local communities, which are directly impacted by this proposed mega Casino project, with a corresponding projected loss of $8-$10M annually to occur to the City’s General Fund Operating Budget through an existing Municipal Services Agreement between the City of San Pablo and Lytton Tribe. Our City/County of ________echoes these concerns as we support City and County regional partnerships and services with the City of San Pablo which are mutually and jointly funded between several local municipalities and Contra Costa County across the West Contra Costa County region.

In closing, the City/County of _________urges BIA officials to carefully evaluate all significant, adverse socio-economic and environmental impacts under a comprehensive, and meaningful engagement process under NEPA, with all members of the public, stakeholders and other Tribes and local communities who will be directly impacted by this newly proposed, mega Casino project.

Furthermore, we hereby request that US Department of Interior and BIA officials to take the time to hear from all affected parties, and avoid from making any expedited final determinations or lasting detrimental impacts which would be precedential, and potentially ushering in a new era of diminished scrutiny of the regulatory process that circumvents proper consultation with affected local Tribes and communities on mega Casino projects in the Bay Area region.

Thank you for the opportunity to voice these concerns and comments on the NEPA environmental review process to date.

SINCERELY:
__________________, MAYOR/COUNTY SUPERVISOR
City/County of ____________________
cc: US Senator Alex Padilla
US Senator Laphonza Butler
US Representative John Garamendi, D-8th
San Pablo City Council

Page 31 of 945 ends

The Board of Supervisors
County Administration Building
1025 Escobar St., 4th floor
Martinez, California 94553
John Gioia, 1st District
Candace Andersen, 2nd District
Diane Burgis, 3rd District
Ken Carlson, 4th District
Federal D. Glover, 5th District
July 26, 2024
The Honorable Deb Haaland
Secretary
U.S. Department of the Interior
1849 C Street, NW
Washington, DC 20240
RE: Concerns Regarding the Proposed Scotts Valley Mega Casino and Tribal Housing Project in Solano County, Vallejo, CA
Dear Secretary Haaland:

Please allow this letter to serve as a letter of comment and concern from the Contra Costa County Board of Supervisors regarding the current Environmental Assessment (EA) document circulated on July 8, 2024 by the US Department of Interior / Bureau of Indian Affairs (BIA) officials to address the environmental impacts associated with the above mega Casino project, located in Solano County, City of Vallejo, CA under the National Environmental Policy Act (NEPA).

Contra Costa County urges BIA officials to not expedite its public review of the current EA document without fully addressing and evaluating all significant environmental impacts of the proposed mega Casino project under an appropriate Environmental Impact Statement (EIS) under NEPA for the proposed project.

Contra Costa County supports comments previously submitted by the City of San Pablo, CA on July 22, 2024 to BIA officials in addition to other comments expressed to BIA officials to date on their grave concerns over the lack of a full, comprehensive review of all associated environmental, socio-economic and environmental justice impacts associated with this proposed project in the EA document.

Since 1999, San Pablo has been the host community for the San Pablo Lytton Casino, owned and operated by the Lytton Rancheria Band of Pomo Indians, in West Contra Costa County which is located 16-miles from the proposed project site along the I-80 freeway corridor. The City of San Pablo and San Pablo Lytton Casino stem to lose significant annual Casino funds (i.e. -20% annual reduction) which will pose a significant socio-economic and environmental justice impacts to this low-income and socio-disadvantaged community in West Contra Costa County region.

Monica Nino
Clerk of the Board
and
County Administrator
(925) 655-2075
Contra
Costa
County

Page 32 of 945 ends
Page 2 of 2 ends

San Pablo’s current program and service delivery of local municipal services is at stake to its local residents, and surrounding local communities, which are directly impacted by this proposed mega Casino project, with a corresponding projected loss of $8-$10M annually to occur to the City’s General Fund Operating Budget through an existing Municipal Services Agreement between the City of San Pablo and Lytton Tribe. We echo these concerns as we support City and County regional partnerships and services with the City of San Pablo which are mutually and jointly funded between several local municipalities and Contra Costa County across the West Contra Costa County region.

In closing, Contra Costa County urges BIA officials to carefully evaluate all significant, adverse socio-economic and environmental impacts under a comprehensive, and meaningful engagement process under NEPA, with all members of the public, stakeholders and other Tribes and local communities who will be directly impacted by this newly proposed, mega Casino project.

Furthermore, we hereby request that US Department of Interior and BIA officials to take the time to hear from all affected parties and avoid from making any expedited final determinations or lasting detrimental impacts which would be precedential, and potentially ushering in a new era of diminished scrutiny of the regulatory process that circumvents proper consultation with affected local Tribes and communities on mega Casino projects in the Bay Area region.

Thank you for the opportunity to voice these concerns and comments on the NEPA environmental review process to date.

Sincerely,
FEDERAL D. GLOVER
Chair, Board of Supervisors
cc: Amy Dutschke, Regional Director, BIA Pacific Regional Office US Senator Alex Padilla
US Senator Laphonza Butler
US Representative John Garamendi, D-8th
San Pablo City Council
Contra Costa County Board of Supervisors
Monica Nino, County Administrator
Thomas Geiger, County Counsel
Paul Schlesinger & Jim Davenport, Thorn Run Partners

Page 33 of 945 ends

CITY COUNCIL
REPORT 9.D.

DATE: AUGUST 20, 2024
TO: MAYOR AND COUNCIL MEMBERS
FROM: LILLY WHALEN, COMMUNITY DEVELOPMENT DIRECTOR
SUBJECT: ISSUE LETTER OF SUPPORT FOR THE CITY OF PINOLE AND RICHMOND COMMUNITY FOUNDATION’S APPLICATION TO THE PARTNERSHIP FOR THE BAY'S FUTURE POLICY FUND GRANT (COHORT 3)

RECOMMENDATION
Issue a letter of support for the City of Pinole and Richmond Community Foundation’s (RCF) application to PBF’s Policy Fund Cohort 3.

BACKGROUND
The Partnership for the Bay's Future (PBF) is a collaborative initiative involving philanthropic, private, nonprofit, and public sectors, along with community and faith-based leaders, housing experts, elected officials, and residents. PBF aims to protect current affordable housing residents and to preserve and produce additional affordable housing in the Bay Area, focusing on racial equity and economic inclusion.

The Policy Fund, managed by the San Francisco Foundation, aims to improve local policy and address housing needs. It places fellows in local governments to enhance expertise and foster collaboration, develops partnerships to advocate for effective housing policies, and provides technical support and models for other regions.

PBF has announced a Request for Proposals for Cohort 3 of the Policy Fund (Attachment A).

This grant offers two years of capacity building, community engagement, and tailored technical assistance to jurisdictions in several Bay Area counties. Selected jurisdictions will receive inkind support from a full-time PBF fellow and funding for community partners. A letter of support from a local government’s Mayor or Councilmember is required with the application. The deadline is August 30, 2024.

REVIEW AND ANALYSIS
This report requests that the City Council issue a letter of support (Attachment B) for the City of Pinole and the Richmond Community Foundation’s (RCF) application to the Partnership for the Bay's Future (PBF) Policy Fund. The RCF is a not-for-profit organization whose goal is to create and support systems built on equity and justice, free from racism, bias and discrimination. RCF achieves this through connection and collaboration with community partners, residents and local governments to identify and address community issues that maintain inequities and share information and resources to increase access to opportunities.

Page 34 of 945 ends

The proposed project’s application to the PBF Policy Fund aims to implement key programs from the City’s adopted and certified Housing Element. The proposed project involves using a social impact bond model to rehabilitate abandoned and blighted homes, promote first-time homeownership, provide affordable housing options, engage local BIPOC (Black, Indigenous, and people of color) contractors and real estate agents, and revitalize neighborhoods. This initiative, supported by a PBF Fellow and the RCF, aims to implement Housing Element Programs 17, 16, and 7, and enhance the City’s existing Rental Registry Program.

The primary goals of the work are to rehabilitate abandoned and blighted homes, create modern and energy-efficient homes, and promote first-time homeownership. The proposed project will be funded using a social impact bond model to finance the acquisition and rehabilitation of these homes. Additionally, the proposed project aims to provide opportunities for affordable homeownership, engage local BIPOC contractors and real estate agents, and revitalize neighborhoods. The renovated homes will be modern, energy-efficient, safe, and healthy, making them attractive options for first-time homebuyers. Engaging local BIPOC contractors and real estate agents will boost the local economy and promote inclusion.

Ultimately, this initiative aims to revitalize neighborhoods, improving both safety and property values. The proposed project also seeks to develop a policy for the City’s use of limited affordable housing funds, establish systems to ensure rentals are properly licensed and regularly inspected, and enhance the City's understanding of its rental stock.

The proposed project aligns with several key programs in the City’s Housing Element:
• Housing Element Program 17: Focuses on acquiring and rehabilitating blighted or distressed properties to make them available to low-income households as affordable housing. This project will pursue partnerships with local BIPOC contractors and utilize the social impact bond model for financing.
• Housing Element Program 16: Seeks to reinstate the City’s Rehabilitation Assistance Program by exploring local, state, and federal funding opportunities annually. This project will align with these goals by seeking funding to reinstate the City’s Rehabilitation Assistance Program.
• Housing Element Program 7: Aims to develop a policy that prioritizes the use of affordable housing funds in alignment with RHNA requirements, local housing needs, and fair housing objectives. This includes creating affordable housing in highopportunity areas, waiving park impact fees for affordable units, and potentially introducing an in-lieu fee alternative for inclusionary housing requirements. Part of the work under the PBF’s Grant Policy will incorporate these priorities.

Additionally, staff has identified that the City would benefit from a comprehensive system to monitor and track rental properties to both ensure that rentals are properly licensed and regularly inspected and provide the city with further understanding of its rental stock. This includes creating a rental property registry and inventory of at-risk units, implementing landlord licensing and local eviction tracking, acquiring software for rental registration, training staff, marketing the program, and outsourcing inspection services to meet increased demand. Part of the work done under the PBF’s Grant Policy will support these objectives by ensuring compliance with health and safety standards and enhancing the City’s understanding of its rental stock.

Page 35 of 945 ends

In terms of alignment with city goals, the project supports the implementation of the 2023-2031 Housing Element, addressing the city’s affordable housing and neighborhood revitalization objectives. It strengthens policies for the use of housing funds to meet local needs and ensures comprehensive monitoring and compliance in rental properties. The project will also support first-time homebuyers and provide much-needed affordable housing opportunities.

The RCF has successfully implemented this social impact bond model in the City of Richmond (see case study on the RCF’s pilot project from the EPA- Attachment C) and is excited to work with the City and the PBF to implement these important programs in Pinole.

FISCAL IMPACT
Issuing a letter of support for the City and RCF’s application to PBF’s Policy Fund does not have a fiscal impact.

Awardees are expected to be announced in November 2024, with the work launching in January 2025. If selected as an awardee, the City would commit to the following:
• Designate a staff member to supervise the PBF Fellow for the two-year grant period, providing onboarding, performance feedback, daily guidance, and ensuring the Fellow has an onsite workspace with access to necessary systems and tools. • Ensure staff attend regular PBF meetings, including one in-person meeting and one virtual Government Partner meeting per quarter.
• Collaborate closely with the Community Partner, participating in regular site team meetings.
• Commit to fully implementing policies beyond the two-year grant period, if applicable. • Share key information (updates, briefings, reports) with the Policy Fund and work with the Policy Fund evaluation team to measure outcomes.

If selected as an awardee, the RCF would commit to do the following:
• Designate a staff member to support and guide the PBF Fellow during the two-year grant period, providing guidance, orientation, introductions, and access to key stakeholders.
• Ensure staff attend one in-person convening and one virtual Community Partner meeting per quarter.
• Collaborate closely with the Government Partner, participating in regular site team meetings.
• Support the implementation of policies beyond the two-year grant period, if applicable. • Share key information (updates, briefings, reports) with the Policy Fund and work with the Policy Fund evaluation team to measure outcomes.

ATTACHMENTS
A. PBF Policy Fund RFP
B. Pinole PBF Policy Fund Letter of Support Council
C. RCF Case Study

Page 36 of 945 ends
Page 37 of 945 ends

Ju
n
e 202
4 Policy Fund
Grants
Request for Proposal
and Application

Page 38 of 945 ends

2 Table of Contents
What Is Partnershipo for the Bay's Future 3
Policy Fund 3
Family of Loan Funds 4
What Are the Policy Fund Grants? 4
Why Apply? 5
Who Is Eligible to Apply? 6
What Support Is There to Help
Interested Local Governments Apply? 6
How Do I Apply for a Policy Fund Grant? 9
How Will Applications Be Evaluated? 9
Application and Selection Timeline 10
How Can I Learn More About the Policy Fund? 11
Policy Fund Grant Application 11
Past Grantee Policy Projects
Your Commitment
7 7
baysfuture.org

Page 39 of 945 ends

The Partnership for the Bay’s Future helps make homes more affordable across the Bay Area with a unique dual approach: in collaboration with partners, we 1) work to advance policy changes that protect residents and improve affordability, and 2) invest in building new and rehabilitating existing affordable homes – always through a lens of racial equity and economic inclusion. We bring this two-pronged strategy to life through the
• Policy Fund, which supports policy solutions to stem the tide of displacement, and preserve and produce housing, and
• Family of Loan Funds, which increases housing supply through responsive and creative financing.

The Policy Fund is the key policy arm of the Partnership for the Bay’s Future and recognizes that bold policy change is needed to address our housing shortage and affordability challenges.

Managed by the San Francisco Foundation, the Policy Fund builds the capacity and networks required for equitable local policy change by working with community groups to help them bring the voices of renters, low-income residents, and people of color into the local and regional policy process and by helping local governments create and successfully implement policies that enable more Bay Area residents to remain in their communities.

The Policy Fund administers grant programs that are designed to:
• Increase racial and economic equity across the region by increasing affordable housing production, preserving existing affordable housing, and stemming displacement of people of color and other marginalized communities from across the Bay Area • Develop a robust regional network and a community of practice made up of housing advocates in local government and community-based organizations • Support the rise of new government and community leaders that can support the region’s housing and tenant protection efforts long-term • Provide models for change that inspire other local governments to follow suit • Connect with aligned change efforts across the region that amplify impact What Is Partnership for the Bay's Future?
3 Policy Fund
baysfuture.org

Page 40 of 945 ends

The Family of Loan Funds, one
of the nation’s largest-ever
private-sector housing funds,
supports the production and
preservation of affordable
homes in five Bay Area
counties. Managed by the
Local Initiatives Support
Corporation (LISC), these funds
are designed to address the
lack of affordable homes – a
reality that disproportionately
impacts households of color –
by bridging funding gaps
throughout the region’s rental
housing market.
4 Family of Loan Funds
PBF is launching the 3rd round of the Policy Fund Grant, a program to bring together Bay Area local governments and catalyze policy innovation in tenant protection as well as building and preserving affordable housing in local communities. The Policy Fund will select a cohort of site teams that propose the highest-impact, yet realistically achievable policy plans, from development to implementation, to be a part of the cohort.

The cohort will be made up of local site teams working collaboratively to advance housing production, preservation, and protection policy across the Bay Area. A site team will consist of local government staff (Government Partners) who work closely with their PBF Fellow and a local community partner organization (Community Partner). This "inside-outside" partnership ensures community input and support for local policy research, development, and implementation and provides essential capacity to move the work forward.

What Are the Policy Fund Grants?
baysfuture.org

Page 41 of 945 ends

Within the two-year grant period, each of the Policy Fund Grant site teams will receive two years of capacity building, community engagement, and tailored technical assistance support from the Policy Fund. After the grant period, participants will become part of the Policy Fund alumni program, and continue to have access to the Partnership network and other supports.

Chosen jurisdictions will be expected to pass and/or implement a package of affordable housing production, protection and preservation policies in collaboration with their community partners.

If your jurisdiction is interested in applying and is not sure who might be a suitable community partner, contact the Policy Fund to discuss options.

The Policy Fund Grants are designed to have a transformative effect on how local governments approach housing through community-driven policy. Through increased capacity and tailored technical assistance, these grants will support breakthroughs in local housing initiatives by moving local policies forward.

Over a two-year time frame, Policy Fund sites will receive a capacity building and technical assistance package to pass and implement production, preservation, and protection policies. The package will include:
• A full-time PBF Fellow placed in the local government’s office dedicated to moving Policy Fund Grant work forward. The fellow also serves as a liaison between the local government and the community partner.
• Funding and support for community partners to work in partnership with the local government by helping in developing and building community support for the proposed policies. Community Partners ensure that community voice is part of the policy process and will receive grants from the Policy Fund.
• Peer cohorts that meet regularly throughout the grant period to exchange ideas and problem-solve in real time. These meetings will include training and leadership development for PBF Fellows, Community Partners, and Government Partners. • Access to tailored technical assistance, including technical assistance funds, to boost capacity in areas such as messaging and communications, data analysis, polling and public opinion, and policy and budget strategy, as well as technical analyses needed to inform policy development or implementation.
4 Why Apply?
baysfuture.org 5

Page 42 of 945 ends

Policy Grants are open to local governments (towns, cities, and counties) that are currently experiencing—or at risk of experiencing—displacement or exclusion of low-income people and communities of color. The Policy Fund will accept applications from local governments in the following counties:
• Alameda
• Contra Costa
• Marin
• San Francisco
• San Mateo
• Santa Clara
6 Who Is Eligible to Apply?
Successful applications will explain how the local government will adopt and/or implement its proposed policy package to advance tenant protection, homelessness prevention, affordable housing production and preservation in collaboration with a chosen Community Partner. See below for a list of potential policy projects.

Site teams that have previously received a Policy Fund Grant are eligible to apply.

The Policy Fund is offering support to site teams
who need support in developing their proposals.

Local governments may request a grant by
applying for an Application Grant. These grants
will provide funding to a site team to work with
consultants or cover staff time required to
develop a competitive grant proposal.

If your local government is interested in applying
for this opportunity but is not sure who might be a
suitable Community Partner, contact the Ella
Zimbalist, [email protected], to discuss options.

The Application Grant is an optional support that the
Policy Fund is pleased to offer applicants. Local
governments do not need an Application Grant to
pursue a Policy Fund Grant.

What Support Is There to Help
Interested Local Governments Apply?
baysfuture.org

Page 43 of 945 ends

Previous grantees and policy projects are listed
and described here:
• Cohort 1 (2020-2022)
• Cohort 2 (2022-2024)
• Blog posts
• Evaluation reports
Other PBF highlights:
• Community-Driven Housing Solutions in
Antioch
• Opportunity to Purchase Playbook
• Tangled Roots: An Oral History of
Community in Las Deltas
7 Past Grantee Policy Projects
You may find it helpful to review previous site teams’ policy collaborations to get a sense of what makes a compelling project.

Additionally, we have found over the course of two cohorts that the successful site teams show the following characteristics:
• Government Partners are prepared to supervise and empower the PBF Fellow to bring community voice into the policy process
• Government Partners and Community Partners build trusting, authentic relationships by learning from each other and meeting regularly
• The proposed policies are a high priority for the whole team and the team is prepared to adapt to changing circumstances together
• Each team member is supportive of each other’s role and power, and ready to leverage each other’s strengths to advance policy goals
Selected Government Partners commit to:
• Designate a staff member to supervise the PBF Fellow for the two-year grant period, providing onboarding, performance feedback, daily guidance, and ensuring the Fellow has an onsite workspace with access to necessary systems and tools. • Ensure staff attend regular PBF meetings, including one in-person meeting and one virtual Government Partner meeting per quarter.
• Collaborate closely with the Community Partner, participating in regular site team meetings.
• Commit to fully implementing policies beyond the two-year grant period, if applicable. • Share key information (updates, briefings, reports) with the Policy Fund and work with the Policy Fund evaluation team to measure outcomes.

Your Commitment
baysfuture.org

Page 44 of 945 ends

8 Selected Community Partners commit to:
• Designate a staff member to support and guide the PBF Fellow during the two-year grant period, providing guidance, orientation, introductions, and access to key stakeholders. • Ensure staff attend one in-person convening and one virtual Community Partner meeting per quarter.
• Collaborate closely with the Government Partner, participating in regular site team meetings.
• Support the implementation of policies beyond the two-year grant period, if applicable. • Share key information (updates, briefings, reports) with the Policy Fund and work with the Policy Fund evaluation team to measure outcomes.
baysfuture.org

Page 45 of 945 ends

The Policy Fund will evaluate applications based on the following criteria:

1. Proposed policy solutions backed by community engagement that advance racial and economic equity and facilitate innovative approaches. Successful applications will identify the displacement and exclusion impacts within your local government and propose policy changes that address affordable housing production, tenant protection and/or preservation. Applicant local governments will need to identify a strong community organization to serve as lead partner in community engagement and share a strong community partnership plan. Proposed policy should be grounded in what is most strategic and impactful for your local government.

2. Foster an enabling environment for equitable production, preservation and tenant protection wins. The Policy Fund recognizes that policy change does not occur overnight. While an ideal outcome would include the passage and implementation of new affordable housing production, tenant protection and preservation policies, mapping out and taking significant strides to facilitate longer-term policy goals are also acceptable.

3. Develop and share scalable workplans and outcomes for significant impact. Proposals should demonstrate high impact in producing and preserving affordable housing. The selection committee will also give strong consideration to applications that propose innovative policies that have yet to be tested, but show great promise, or groundbreaking policies that catalyze change in a local government with few to no affordable housing production or preservation policies.

4. Facilitate a robust regional network of housing justice champions in local government and community-based organizations. The Policy Grants are geared towards local governments with the willingness to engage deeply with community to develop policy solutions that meet local needs.

Strong applicants will also have capacity and interest in engaging in regional efforts. Applicant site teams will need to identify a strong community-based organization to serve as lead partner in community engagement and share a strong community partnership plan. This group may have even had a contentious relationship with the lead local government agency in the past but remains wellpositioned to empower local communities and shape the policy-making process. Local governments may select more than one community partner to advance community engagement work.

5. Demonstrate buy-in for the core values and approach of PBF. Both government and community partners must demonstrate understanding and commitment to engaging community in the policy process, and an interest in utilizing an inside/outside strategy to accomplish policy goals. All institutions engaged in your site team are committed to advancing the shared goals even if contexts change.

6. Ability to be an active participant in the PBF network. Proposals should demonstrate a commitment to being active members of the PBF network, including attending quarterly convenings.

Applications should ensure strong institutional and individual buy-in from both Government Partners and Community Partners. Toform maximize impact, applicants should also indicate interest and ability to supervise and support the PBF Fellow.

How Do I Apply for a Policy Fund Grant?
9 How Will Applications Be Evaluated?
baysfuture.org

Page 46 of 945 ends

Application and Selection Timeline
June 2024 • Policy Grant application is released. Applications will be accepted on a rolling basis.

July 2024 • July 9, 1-2pm: Information session. Register here. • July 16, 12-1pm: Information session. Register here.

August 30, 2024 • Policy Grant proposals due
September 2024 • Applications reviewed by the Policy Fund and applicants interviewed 10 • Applicants who are seeking technical assistance in putting together their applications should apply for an Application Grant.

October 2024 • Policy Fund Grant finalists interviewed
• Fellow interviews and site team matching
November 2024 • Site teams announced
January 2025 • Grant and fellowship launch
Please note that dates are subject to change.
baysfuture.org

Page 47 of 945 ends

11 How Can I Learn More About the Policy Fund and Application? Join us for an informational webinar:

For more information or any questions you might have about the Policy Grants, contact Ella Zimbalist at [email protected].
• July 9, 1-2pm. Register here
• July 16, 12-1pm. Register here
Policy Fund Grant Application
Open: Friday, June 21, 2024
Close: Friday, August 30th, 2024 at 11:59 PM PST
Below is the application. When ready to submit, please email your document to Ella Zimbalist at [email protected].

Application
Welcome to the 2025-2027 Policy Fund Grant Application. Thank you for your interest in this opportunity to advance equitable housing solutions in the Bay Area.

The application is meant to help us get to know your site team and better understand your approach and vision for change.

The application is due on Friday, August 30th, 2024. Finalists will be announced in September. Finalists will participate in a site team interview and in the interview and matching process for the PBF Fellows. The awards will be announced in early November and will begin in January 2025.

Need help applying? The Policy Fund is offering Application Grants to local governments who need support in developing their Policy Fund Grant applications. Local government may request an Application Grant here.

I. Basic information
Name of Local Government:

Name of staff contact person for application:

Title:

Government Department:

Email:

Phone Number:
baysfuture.org

Page 48 of 945 ends

12 Policy Fund Grant Application
Name of person providing direct supervision to fellow:

Title:

Government Department:

Email:

Phone number:

Address:

Secondary person providing direct supervision to fellow (in the event the primary person is unavailable), if applicable:

Title:

Government Department:

Email:

Phone number:

Address:

II. Proposal
Please submit a proposal describing the following. Note that there is no minimum or maximum length required. 3 pages should be sufficient but there will be no penalty for going over or under this length.

1. Vision, policy priorities, and impact: Please describe your vision, policy priorities, and anticipated impact. Share why you have chosen to advance these particular policies and whether they are part of a new or continuing effort. Please include whether and how the proposed policies are related to your local government’s Housing Element.

2. Focus on equity: Please describe how your proposal will improve racial and economic equity in your jurisdiction.

3. Past efforts: Please describe the most significant affordable housing preservation and/or production policies or work towards these policies that your city/town has passed in the past 2-5 years. If you have not made significant policy progress, please describe your obstacles.

4. Stakeholders and community partnership: Please share your plan to engage your community in the policy process, with a specific emphasis on engaging low-income people and communities of color. Describe the community group that will serve as your lead partner and, if your application is successful, will receive two years of grant funding from the Policy Fund. Identify the key point person as well as a back-up plan in case of any unexpected transition.

5. Local government leadership and contribution to success of effort: Please describe what your local government will contribute to ensure the success of this effort. This could include your city/town’s track record of equitable housing policies, particular community context, available resources to advance the proposed policy package, or key team members (like staff or electeds) who will support this work. Please also describe how your team sees engaging community as a strategy and asset to advance your specific policy goals. Identify the key point person as well as a back-up plan in case of any unexpected transition. baysfuture.org

Page 49 of 945 ends

13 Policy Fund Grant Application
III. Approach and Key Milestones
Please explain your approach to passing and beginning successful implementation of your policy package, including: 2 pages should be sufficient but there will be no penalty for going over or under this length. There are no formatting requirements.
• Key activities and timeline for policy development, passage and implementation, including semi-annual milestones
• Key stakeholders for policy development, passage and implementation • Your plans for implementing these policies once they are adopted, including timeline, responsible departments/staff and budget
IV. Letters of Support
Please include short letters (no longer than one page) of support for your proposal from the following:
• Your lead community partner: This letter should acknowledge that your community partnership plan was crafted with their input
• Your mayor (if a city) and/or a councilmember
• Your city manager or county administrator
• Optional: Additional key supporting partners who will be part of the Policy Grant effort, such as a key affordable housing developer
baysfuture.org

Page 50 of 945 ends

August 20, 2024
Partnership for the Bay’s Future
2075 Broadway St,
Redwood City, California, 94063
Re: City of Pinole: Partnership for the Bay’s Future Policy Fund – Letter of Support Dear Partnership for the Bay’s Future Policy Fund Review Committee, I am writing on behalf of the City of Pinole in support of our application to the Partnership for the Bay’s Future Policy Fund Grant Program Cohort 3. The City of Pinole is deeply committed to addressing the pressing need for affordable housing within our community while ensuring that our efforts align with principles of racial equity and economic inclusion. We believe that our proposed project embodies these values and will contribute significantly to the well-being of our residents.

The City of Pinole’s proposed initiative aims to issue a municipal bond to support the purchase, renovation, and sale of single-family homes, specifically targeting first-time homebuyers. This project will not only help increase the housing stock in our city but also improve public safety by focusing on properties that currently fall out of code. Additionally, the renovation of these homes will be conducted with a strong emphasis on environmental sustainability, incorporating green technologies to reduce the carbon footprint and promote long-term environmental benefits.

A crucial element of our proposal is our partnership with the Richmond Community Foundation.

This nonprofit organization brings a wealth of experience and a proven track record of success in managing similar programs throughout the Bay Area. Their expertise and dedication to community development make them an ideal partner for this initiative, ensuring that the project will be managed effectively and deliver the intended benefits to our community.

Through this project, we aim to make homeownership more accessible for first-time buyers in Pinole, create safer and more sustainable living environments, and address the broader challenges of housing affordability and equity in the Bay Area. The Partnership for the Bay’s Future Policy Fund’s support will be instrumental in helping us realize these goals.

We are confident that the City of Pinole’s proposed project aligns closely with the mission of the Partnership for the Bay’s Future and will serve as a model for other communities striving to address similar challenges. We respectfully request your consideration of our application and look forward to the opportunity to collaborate with your organization in creating a more equitable and sustainable future for the residents of Pinole.

Sincerely,
Maureen Toms
Mayor
City of Pinole

Page 51 of 945 ends

BROWNFIELDS AND LAND REVITALIZATION
EPA PACIFIC SOUTHWEST/REGION 9
Social Impact Bonds for Housing Revitalization:

A Case Study in Richmond, California
United States
Environmental Protection
Agency
A Unique Approach to Brownfield Revitalization
Leveraging private capital for social good
The City of Richmond, California and the Richmond Community Foundation (RCF Connects) developed a unique approach to address significant challenges with blighted properties and barriers to local home ownership. The city and RCF Connects established a new social impact bond that uses private capital to fund the rehabilitation of abandoned properties in the Richmond area. In addition, the city and RCF Connects leveraged EPA Brownfields Assessment and Cleanup grants to address some of the city’s most challenging residential properties. Since the project began in 2015, RCF Connects has rehabilitated and sold dozens of affordable homes to first time homebuyers, facilitated millions of dollars of local spending, and attracted new investments to continue the organization’s housing work. This case study shares the city’s and RCF Connects’ approach and suggests how other communities can replicate their efforts.

Social Impact Bond
A social impact bond
is a financial mechanism
where the private sector
provides investment funds to
the public sector for social
benefit. Well-performing social
impact bonds are attractive
to local banks because of
Community Reinvestment
Act requirements.

A Step-by-Step Guide on How to Set Up a Social Impact Bond-Funded Revitalization Program 1 Establish a
city ordinance
that outlines
the social
impact bond’s
parameters.

A formalized
ordinance will
guide the actions
of all partners
involved and
establish a legal
connection
between the
organization and
the city.
2 3 4 5 6 7
Clearly
outline project
partners’ roles.

A memorandum
of understanding,
paired with a city
ordinance, should
create a common
set of metrics
for success and
define the role
of each partner,
establishing a
clear project
vision.

Seek out
other sources
of financial
support,
like EPA
Brownfields
funding.

Supplementing
social impact
bond funds with
additional financial
support will allow
for maximum
flexibility in
selecting which
properties to
rehabilitate and
what resources
to apply. EPA
resources
can address
brownfield
properties that
have sat idle
for years.

Have a
strategy for
choosing which
properties to
rehabilitate.

City and local
neighborhood
councils can
help identify
and prioritize
properties.

Incorporate
environmental
sustainability
principles
into property
rehabilitation.

Professionally
abating
environmental
issues and
incorporating
high-quality,
energy-saving
upgrades into
renovations
will create
financially and
environmentally
sustainable
properties.

Prioritize
the sale of
new homes
to first time
homebuyers.

Owning a home
gives individuals
access to new
avenues for
building wealth
and establishing
themselves in
a community.

This priority
is especially
important for
organizations
whose mission
involves
environmental
justice and
opening doors
for systemically
disadvantaged
communities.

Advertise
achievements.

Celebrate
successes,
acknowledge
partners,
and market
the program
to different
audiences. Host
events like key
ceremonies
to highlight
accomplishments,
conduct media
and social media
outreach, and
market among
trade groups and
networks.

Page 52 of 945 ends

Creating a Structure for Success
Establish a clear ordinance and build on city partnerships RCF Connects established a strong framework for their
rehabilitation projects by working with the city to issue a social impact bond through a city ordinance. The ordinance and the associated Memorandum of Understanding set financial and social metrics for the work and defined each partner’s role. In addition, they established a common vision for RCF Connects, the city, and the bond’s investor (locally-based Mechanics Bank). The ordinance also guaranteed that the city would not be liable for the bonds.

Before After
Richmond home before and after renovation
New homeowners Anthony Caro and Mitzi Perez-Caro
“I’m a homegrown educator, and I
honestly didn’t think buying a home in
Richmond was feasible. This program
shifted my thinking.”
– Mitzi Perez-Caro
The long-standing relationship between RCF Connects and the city, developed through years of partnering on community development efforts, provided the foundation for this
collaboration. Through partnering on the social impact bond, both entities leveraged their strengths for mutual benefits and success.

The city can now expedite review of construction permits on social impact bond-funded properties. RCF Connects can obtain access to properties with liens from the city. These are just two examples of how the social impact bond has made addressing pervasive blight more efficient, resulting in the rehabilitation of homes, as well as increases in tax revenue and related benefits.

Improving Neighborhoods,
One Property at a Time
Blighted brownfield properties become community assets
RCF Connects focused on properties that developers and
homebuyers considered too risky, including properties with significant environmental challenges and those in the court system for tax delinquency and probate. Social impact bond funds allowed RCF Connects to access many blighted homes in the Richmond area. Before acquiring a potentially contaminated property, RCF Connects conducted a Phase I Environmental Site Assessment or All Appropriate Inquiries. Some properties required additional assessment and cleanup due to historic contamination. After RCF Connects identified certain properties as “brownfields,” they worked with EPA and the city to use EPA Brownfields Assessment and Cleanup funding. This additional grant funding allowed RCF Connects to tackle some of the most environmentally challenging properties in the city. In this sense, EPA became another important partner—helping to ensure RCF Connects’ renovated properties were safe for new homeowners.

Page 53 of 945 ends

Local Spending, Local Impacts
Supporting community development by promoting
economic activity
The results of the social impact bond partnership between RCF Connects and the city are tremendous. Their efforts produced considerable financial benefits for the community, including:

Over $6.5M in local spending
Reduction of the city’s code enforcement
costs by $350,000 per year
Repayment of nearly $800,000 in code
enforcement liens and property taxes
An annual increase of over
$90,000 in property tax revenue
An estimated $697,000 per year to the
local economy from new homeowners
Rehabilitation Funding Sources
Social Impact Bond
$3,000,000
EPA Assessment Grants
$700,000
EPA Clean Up Funds
$264,000
Other Grants
$400,000
Prioritizing Equitable Development
Eco-friendly homes that build community wealth
RCF Connects prioritized sustainability and equity in
their rehabilitation work to ensure people could
buy, afford, and maintain renovated homes.

In partnership with the California Energy
Commission, RCF Connects used state climate
change mitigation funding to purchase energyefficient appliances and make other environmentally conscious improvements to their homes. By partnering with EPA and using EPA Brownfields grants, RCF Connects also ensured the finished homes were contaminant-free.

Additionally, RCF Connects worked with SparkPoint Contra Costa, a local financial services collaborative partnership that helps individuals build a financially secure future. RCF Connects prioritized selling rehabilitated homes to graduates of SparkPoint Contra Costa’s homebuyer program, connecting buyers with the program’s newly renovated and energy efficient properties. RCF Connects also ensured the homes sold through their program would be lien-free, allowing homeowners to accrue value on their property and build wealth for themselves and their community.

Building Momentum, Building Wealth
Expand a successful program with new investments
The combination of pairing the city’s social impact
bond investments with EPA Brownfields grantfunded work has highlighted a new way to locally finance challenging redevelopment projects.

Mechanics Bank was motivated to become the
social impact bond’s initial investor because it helped them meet federal Community Reinvestment Act requirements.

However, the compelling results of the social impact bond has led Mechanics Bank to extend their investment for another five years.

RCF Connects’ success has also attracted investment interest from new sources. Most recently, a group of donors contacted RCF Connects to build a Black homeownership fund. This fund will help members of the Black community purchase homes by providing up to $15,000 for down payment assistance or to cover closing costs. The loan is only repaid when the home is sold or the mortgage is refinanced.

Community Reinvestment Act
The Community Reinvestment Act encourages
financial institutions to help meet the credit needs of the communities in which they work. The Act gives
the financial institution incentive to balance the risks it undertakes as a social impact bond investor.

Page 54 of 945 ends

“The [social impact bond] program can make a huge difference for a local community. It is mutually beneficial to the cities it supports and the banks that provide the financing. In my opinion, there are few direct investment opportunities for a bank that can be as impactful as a social impact bond.”
– CJ Johnson, Partner, Ford Financial Fund (Majority Owner of Mechanics Bank) Lessons Learned
Relationships matter—Establish partnerships with city government staff and the community Cultivate champions. Advocate for those within city government who will coordinate across city departments to shepherd the ordinance through the system, make sure the bond is issued, and recommend other potential government resources such as grants.

Build connections. Interface with other relevant partners that will interact with the bond and the social impact bond program. Examples include county tax collectors/treasurers, probate court judges, investors, neighborhood organizations, insurance groups, and realtors.

Engage the community. Community members are a great resource for spreading the word about the program and demonstrating support to decision-makers, such as investors and city officials. Neighborhood councils can also help identify properties that need revitalization.

Metrics count—Develop a well-defined program vision and measure results Stay on track. Identifying metrics for success will provide vital guidance for project work. RCF Connects’ metrics include financial return on investment, improvement in community policing and safety, and the number of first-time homeowners who purchased renovated homes.

Measure return on investment. Tracking investment growth over time helped RCF Connects determine how much money to invest in individual properties. Keeping a record of the program’s impacts on the community also gives investors an idea of how their money makes a difference and increases the likelihood of reinvestment.

United States
Environmental Protection
Agency
For more information on RCF Connects and the City of Richmond, visit rcfconnects.org and www.ci.richmond.ca.us/2457/Code-Enforcement Region 9 Case Study | Richmond, CA | August 2021

Page 55 of 945 ends

CITY COUNCIL
REPORT 10.A.

DATE: AUGUST 20, 2024
TO: MAYOR AND COUNCIL MEMBERS
FROM: DAVID HANHAM, PLANNING MANAGER
SUBJECT: EXTENSION OF ENTITLEMENTS FOR PINOLE VISTA PROJECT 223-UNITS 1500 FITZGERALD, ROIC DEVELOPMENT

RECOMMENDATION
Staff recommends that the City Council hold a public hearing and adopt Resolution to extend the entitlements approved in Resolution 22-96 for the Pinole Vista Apartment Complex at 1500 Fitzgerald Drive (APN 426-391-010) through October 18, 2026.

BACKGROUND
The property at 1500 Fitzgerald Drive is a vacant commercial retail building, previously occupied by Kmart and owned by ROIC Pinole Vista LLC. It has been empty since early 2019, with occasional seasonal uses like the Halloween Spirit store. The site is bordered by Fitzgerald Drive to the north, residential areas in El Sobrante to the south, Pinole Shopping Center to the east, and Best Buy (Pinole Vista II) to the west. Tenants of the Pinole Vista Shopping Center include Mountain Mike’s Pizza, Lucky’s Supermarket, Starbucks, and others.

Refer to Figure 1 for an aerial view and Figure 2 for the proposed project layout.

Figure 1: Project Location Figure 2: Proposed Project Layout The project involves demolishing a 91,000-square-foot vacant retail building (formerly Kmart) at 1500

Page 56 of 945 ends

Fitzgerald Drive and constructing a five-story, 263,862-square-foot apartment building with 223 units.

Approved by the Council on October 18, 2022 (see Attachment B for Resolution 2022-96), the project includes 13 very-low-income units, 14 low-income units, and 196 market-rate units, complying with the City’s inclusionary housing requirements (PMC 17.32.020). The new building will have the same orientation as the former Kmart, with main entrances facing the existing shopping center. The front façade will feature 90- degree parking stalls instead of the original 45-degree layout. The rear of the building will include an additional row of parking and three entrances connecting to the front lobbies. The sides will have added landscaping, and a new passive open space will be created on the southern end. Landscaping will also be added to the front elevation and within the two parking rows. Refer to Figure 2 for the approved project layout, Attachment C for the full project overview, and Table 1 and Table 2 for application details and project milestones.

Table 1 – Summary of Project Entitlements Issued for Pinole Vista Table 2 Chronological Order of Entitlements for Pinole Vista Date Item Approving Body Decision
04/6/2021 Application was submitted for the
Pinole Square Project
n/a
05/05/2021 AD-Hoc meeting Notes were taken and given to the Developer to add to the design of the
project.
07/29/2021 Virtual Community Meeting n/a
Project Items Entitlement Granted – October 18, 2022 Corresponding Resolution
Environmental Review Adopt an Initial Study/Mitigation Negative Declaration and Mitigation Monitoring &
Reporting Program.

Reso 2022-96
Design Review for Pinole Vista
Apartment DR 21-12
Approval of a Design Review for the entire
site.

*Reso 2022-96
Tree Removal Permit To remove trees along Fitzgerald for inclusion or the new landscape plan for the project
Reso 2022-96
Note: The * represents the entitlements requesting to be extended

Page 57 of 945 ends

07/14/2022 Ad-Hoc Meeting Review of the plans was completed and the requests from the May 5,
2021, meeting were completed.
07/25/2022 Planning Commission Meeting The Planning Commission adopted Resolution 22-05, recommending
approval of the the Comprehensive
Design Review, Environmental
Determination, Tree Removal
Permit, and Density Bonus to the
City Council.
10/18/2022 City Council Meeting The City Council adopted Resolution 22-96, approving the Comprehensive
Design Review, Environmental
Determination, Tree Removal
Permit, and the Density Bonus
04/22/2024 to current Applicant applies for Extension of Entitlements for the project located
at 1500 Fitzgerald 223-unit
Apartment Complex
n/a

REVIEW AND ANALYSIS
Framework for Extension
The Municipal Code provides a process for the expiration of entitlements. Section 17.10.100 (A) of the Pinole Municipal Code (PMC) states: Unless a condition of approval or other provision of this title establishes a different time limit, any permit not exercised within one (1) year of approval shall expire and become void, except where an extension of time is approved in compliance with division C. below.

Condition No. 6 in City Council Resolution No. 2022-96 (Attachment B) provides two (2) years for the applicant to "exercise" the entitlement. With a City Council approval date of October 18, 2022, the Pinole Vista entitlements will expire on October 18, 2024, unless the permit is “exercised,” or an extension was requested and granted, by that date.

Section 17.10.100 (B) of the PMC provides information on what it means for a permit to be "exercised:" The exercise of a permit occurs when the property owner has performed substantial work and incurred substantial liabilities in good faith reliance upon such permit(s). A permit may be otherwise exercised pursuant to a condition of the permit or corresponding legal agreement that specifies that other substantial efforts or expenditures constitutes exercise of the permit.

For the Pinole Vista Apartment project, condition No. 6 in Resolution No. 2022-96 indicates that "entitlements shall be considered exercised when a Building Permit is issued for the apartment structure." A building permit for the apartment structure has not been applied for. Therefore, the entitlements granted on October 18, 2022 have not yet been exercised, and an extension is required in order to keep the permits valid.

Section 17.10.100 (C) of the PMC states: The approval of an extension extends the expiration date for two (2) years from the original permit date. After this initial permit extension, a final one (1)-year extension of time may be granted pursuant to the same process as set forth in this section.

The applicants of the Pinole Vista Apartment project have requested an initial permit extension of two-years, through October 18, 2026, to exercise their entitlements (i.e., Building Permit is issued).

Section 17.10.100 (C) of the PMC provides information regarding the process of extending

Page 58 of 945 ends

entitlements:

1. Process. The same approving authority that granted the original permit may extend the period within which the exercise of a permit must occur. Notice and/or public hearing shall be provided in the same manner as for the original permit. An application for extension shall be filed not less than thirty (30) days prior to the expiration date of the permit, along with appropriate fees and application submittal materials.

2. Conditions. The permit, as extended, may be conditioned to comply with any development standards that may have been enacted since the permit was initially approved.

3. Permit extension findings. The extension may be granted only when the designated approving authority finds that the original permit findings can be made and there are no changed circumstances or there has been diligent pursuit to exercise the permit that warrants such extension.

The process for an extension requires that the review authority for an extension request is the original body who acted on the permit, and therefore, a request for an extension from the City Council is required. During consideration of the extension request, the permit may be conditioned to comply with any development standards that may have been enacted since the permit was initially approved. Additionally, to grant approval of the time extension, the Council must find that the original permit findings can be made and there are no changed circumstances or there has been diligent pursuit to exercise the permit that warrants such an extension.

Analysis of Request for Extension
The applicant submitted materials for a formal request for an extension of the entitlements on April 22, 2024 (Attachment D). The request indicates market conditions have prohibited the Project from moving forward at this time. These conditions include "abnormally high interest rates, extremely high construction costs, lack of developer interest in a project with a labor union agreement, and rent escalation not matching development cost escalation".

The Council can approve the extension based on the finding of fact that the original permit findings can be made and no changed circumstances to the Project. Staff supports the Applicant’s request for an extension.

While the delays in this project are unfortunate, it is not uncommon for projects of all types and sizes to have suffered delays during the last two years as a result of the COVID-19 pandemic and related impacts, such as supply chain disruptions and/or difficulty with financing. The applicant has stated that despite these challenges, they remain "committed to the completion of the Project. An extension will result in the best chance of much-needed housing being built at the site."

FISCAL IMPACT
All permitting costs are borne by the applicant. Approving the extension will not have a direct negative fiscal impact on the City, and in fact, the project could lead to indirect fiscal benefits for Pinole if extended and completed, including:
• Increased property tax revenue from redevelopment and improvements. • Potential increase in sales tax revenue from up to 600 new residents living near the shopping center and from construction activities during the 2-4 year build-out, which could boost local spending at restaurants, grocery stores, and personal services.

ATTACHMENTS
A. Resolution
B. 2022-96 CC Resolution
C. Approved Plans
D. Extension Request

Page 59 of 945 ends
Page 60 of 945 ends

RESOLUTION NO. 2024-XX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PINOLE APPROVING A

TWO-YEAR EXTENSION OF THE ENTITLEMENTS ADOPTED VIA CITY COUNCIL RESOLUTION 2022-96 FOR THE PINOLE VISTA APARTMENT COMPLEX PROJECT LOCATED AT 1500 FITZGERALD (APN: 426-391-010)
WHEREAS, ROIC LP, c/o Metrovation/Chris Cole Inc., (Applicant) filed an application with the City of Pinole for a Comprehensive Design Review, for the purpose of constructing 223 apartments housing units and in accordance with Title 17, of the Pinole Municipal Code (the “Project”); and
WHEREAS, the Project site is located on the south side of Fitzgerald Drive on a property identified as APNs 426-391-010; and
WHEREAS the Project site has a General Plan Land Use Designation of Sub Service Area (SSA) and has a Specific Plan Land Use designation and Zoning designation of SSA/Appian Way Corridor/Commercial Mixed Use (CMU); and WHEREAS, a new multifamily residential development is a permitted use on the Project Site subject to review and approval of a Comprehensive Design Review application; and
WHEREAS, the Applicant has proposed 15% affordability for the units in the Project and has requested a density bonus as permitted by State Law, including concessions and waivers; and
WHEREAS, the City Council on October 18, 2022, adopted Resolution 2022-96 approving a Comprehensive Design Review, a Density Bonus with concessions, and an Environmental Determination for the Pinole Vista Project; and WHEREAS, Condition No. 6 in City Council Resolution No. 2022-96 provides two (2) years for the applicant to exercise the entitlement and that entitlements shall be considered exercised when a Building Permit is issued for the apartment structure; and WHEREAS, ROIC requested an extension for all of the entitlements that were approved on October 18, 2022 indicating among other challenges, that there are market conditions that have prevented the entitlements from being exercised, including cost escalations in financing and construction materials and labor; and

Page 61 of 945 ends

WHEREAS, in compliance with California Environmental Quality Act (CEQA), the City Council adopted, pursuant to Resolution No. 2022-96 a Notice of Exemption (NOE) which are hereby incorporated by reference; and
WHEREAS, no further environmental review is necessary for the project since the scope of the project has not changed or been altered since the previous adoption of the NOE; and
WHEREAS, a notice of the public hearing to consider the proposed extension was distributed to all property owners within 1,500 feet of the project site and a notice was published in the August 9, 2024, edition of the West County Times; and WHEREAS, the City Council has held a duly noticed public hearing considered all public comments received, the presentation by City staff, the staff report, and all other pertinent documents regarding the proposed request.

NOW THEREFORE, BE IT RESOLVED, that the above recitals are true and correct and made part of this resolution.

BE IT FURTHER RESOLVED that the City Council of the City of Pinole grants an extension of the entitlements of the Pinole Vista Apartment Complex project, as contained in City Council Resolution No. 2022-96, for two (2) years, through October 18, 2026, and makes the following findings:

Section 1. The original permit findings, as made in City Council Resolution No 2022-96 can still be made and there have been no changed circumstances which prevents the City Council from making such findings again.

Section 2. The Applicant has diligently, under current circumstances, pursued exercising the permits granted by City Council Resolution No. 2022-96 and an extension of those permits is warranted.

BE IT FURTHER RESOLVED that the conditions of approval for City Council Resolution No. 2022-96 shall remain in full force and effect.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Pinole held on the 20th day of August 2024 by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

Page 62 of 945 ends

I, hereby certify that the foregoing resolution was regularly introduced, passed, and adopted on the 20th day of August 2024
______________________________________
Heather Bell CMC
City Clerk

Page 63 of 945 ends
Page 64 of 945 ends
Page 65 of 945 ends
Page 66 of 945 ends
Page 67 of 945 ends
Page 68 of 945 ends
Page 69 of 945 ends
Page 70 of 945 ends
Page 71 of 945 ends
Page 72 of 945 ends
Page 73 of 945 ends
Page 74 of 945 ends
Page 75 of 945 ends
Page 76 of 945 ends
Page 77 of 945 ends
Page 78 of 945 ends
Page 79 of 945 ends
Page 80 of 945 ends
Page 81 of 945 ends
Page 82 of 945 ends
Page 83 of 945 ends
Page 84 of 945 ends
Page 85 of 945 ends
Page 86 of 945 ends
Page 87 of 945 ends
Page 88 of 945 ends
Page 89 of 945 ends
Page 90 of 945 ends
Page 91 of 945 ends
Page 92 of 945 ends
Page 93 of 945 ends
Page 94 of 945 ends
Page 95 of 945 ends
Page 96 of 945 ends
Page 97 of 945 ends
Page 98 of 945 ends
Page 99 of 945 ends
Page 100 of 945 ends
Page 101 of 945 ends
Page 102 of 945 ends
Page 103 of 945 ends
Page 104 of 945 ends
Page 105 of 945 ends
Page 106 of 945 ends
Page 107 of 945 ends
Page 108 of 945 ends
Page 109 of 945 ends
Page 110 of 945 ends
Page 111 of 945 ends
Page 112 of 945 ends
Page 113 of 945 ends
Page 114 of 945 ends
Page 115 of 945 ends
Page 116 of 945 ends
Page 117 of 945 ends
Page 118 of 945 ends
Page 119 of 945 ends
Page 120 of 945 ends
Page 121 of 945 ends
Page 122 of 945 ends

MITCHELL WAY

STALLION ROAD

KELVIN RD

FITZGERALD DR
300' TYP. PROJECT SITE LOCATION OF PROPOSED BUILDING, SHOWN DASHED GENERAL PROJECT INFORMATION A0.0 DRAWING LIST A0.0 GENERAL INFORMATION ARCHITECTURAL SHEET NO. & TITLE A2.3 PLANS A3.1 BUILDING ELEVATIONS A3.2 A3.3 BUILDING ELEVATIONS PERSPECTIVE VIEWS A2.2 PLANS A2.1 PLANS A3.4 PERSPECTIVE VIEWS 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL A4.1 BUILDING SECTIONS MATERIALS AND COLORS A3.5 VICINITY MAP A2.4 UNIT PLANS L1.1 CONCEPTUAL LANDSCAPE PLAN LANDSCAPE L1.2 COMMON AREA DETAIL PLANS L1.3 HILLSIDE PARK AREA L2.1 CONCEPT IRRIGATION PLAN C1.0 EXISTING CONDITIONS CIVIL C2.0 GRADING AND DRAINAGE PLAN C2.1 GRADING AND DRAINAGE PLAN C3.1 UTILITY PLAN C3.0 UTILITY PLAN PROJECT DIRECTORY OWNER: ROIC PINOLE VISTA, LLC. 11250 El Camino Real, # 200 San Diego, CA 92130 Contact: Chris Cole [email protected] ARCHITECT: Isaiah Stackhouse, Principal TRACHTENBERG ARCHITECTS 2421 Fourth Street Berkeley, CA 94710 510.649.1414 www.TrachtenbergArch.com CIVIL: Casey McDondald, PE ADOBE ASSOCIATES 1220 N. Dutton Ave Santa Rosa, CA 95401 707-541-2300 www.adobeinc.com LANDSCAPE ARCHITECT: Don MacNair MACNAIR LANDSCAPE ARCHITECTURE PO Box 251 Kenwood, CA 95452 707-833-2288 www.macnairlandscapes.com A3.6 PERSPECTIVE VIEWS A2.0 SITE PLAN A2.5 TRASH / RECYCLING ENCLOSURE PLANS C1.1 DEMOLITION PLANS A0.1 OPEN SPACE DIAGRAMS A3.7 PERSPECTIVE VIEWS A3.8 PERSPECTIVE VIEWS A3.9 PERSPECTIVE VIEWS LIGHTING PLAN LIGHTING -C4.0 FITZGERALD CROSSWALK PLAN L1.4 TREE IMAGES L1.5 FENCE EXHIBIT ATTACHMENT B

Page 123 of 945 ends

9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' COURTYARD B LOBBY B COURTYARD A LOBBY C LOBBY D LOBBY A LOUNGE ALEASING FITNESS MEP MEP MEP BIKES (40) BIKES (40) BIKES (40) BIKES (40) CLUB ROOM A CLUB ROOM B MEP STO ENCL. 1 ENCL. 3 ENCL. 2 COVERED TRELLIS CONNECTION TO RETAIL REAR YARD AREAS, 39,979 SF PRIVATE PATIOS PRIVATE PATIOS PRIVATE PATIOS PRIVATE PATIOS PRIVATE PATIOS PRIVATE PATIOSPRIVATE PATIOS PRIVATE PATIOSCOURTYARD B COURTYARD B FRONT YARD AREAS ENCLOSED PLAY AREA, SEE LANDSCAPE PLANS (INCLUDED IN REAR YARD TOTAL SF) NATURAL PLAY AREA (INCLUDED IN REAR YARD TOTAL SF) OPEN SPACE DIAGRAMS A0.1 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 17.98.020 GENERAL DEFINITIONS. USABLE OPEN SPACE. Outdoor space, including natural and landscaped ground areas, pools, patios, decks, and balconies, designed for active or passive recreational use and which is accessible to the occupants of a building on the same lot. COMMON OPEN SPACE PRIVATE OPEN SPACE KEY

Page 124 of 945 ends

NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' REAR YARD, SEE LANDSCAPE PLANS COURTYARD B LOBBY B COURTYARD A 86'-0"
81'-0"
86'-0"
81'-0" LOBBY C LOBBY D ROOF DECK AT LEVEL 5 BELOW 27'-10" 27'-0" 16'-0" 5'-0" 16'-0" 29'-0" 6'-8" 16'-0" 27'-10" 27'-0" R22'-6" R37'-6" R22'-6" R37'-6" FRONT YARD 1A3.2 1A4.1 2A3.2 1A3.1 1A3.2 2A4.1 1A3.4 1A3.6 27'-0" 27'-0" STAIR TO ROOF WEST DRIVEWAY MAIN ENTRY DRIVE EXISTING COMMERCIAL PARKING ON ADJACENT PARCEL TO REMAIN ADJUSTED PARCEL LINE, SEE CIVIL DRAWINGS, TYPICAL NEW TRELLIS AND PEDESTRIAN LINK TO EXISTING RETAIL 278 RESIDENTIAL PARKING SPACES FITZGERALD DRIVE EXISTING COMMERCIAL BUILDING ON ADJACENT PARCEL TO REMAIN ADJACENT NEIGHBOR "BESTBUY" ADJACENT NEIGHBOR "GOODYEAR" "LUCKY" GROCERY 142'-3" SETBACK TO EAST 77'-6" SETBACK TO WEST 67'-0" AVG. SETBACK TO NORTH
167'-4" AVG. SETBACK TO SOUTH NEW PARKING BULBS, SEE CIVIL DRAWINGS, TYPICAL LOBBY A STAIR TO ROOF 16'-6" 14' CLR. 14' CLR. 14' CLR. NEW TRELLIS AND PEDESTRIAN LINK TO PLAY AREAS PROPOSED GATES

PROPOSED
GATES SEE CIVIL PLANS FOR SIDEWALK IMPROVEMENTS SEE LANDSCAPE PLANS FOR NEW FENCING, TYP. SOLAR COVERED STALLS EV CHARGING STATIONS (FUTURE) SITE PLAN A2.0 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1- SITE PLAN 1/64"=1'-0" @ 11x17 1/32"=1'-0" @ 24x36 0 16 32 32 N

Page 125 of 945 ends

NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' COURTYARD B LOBBY B COURTYARD A
86'-0"
81'-0"
86'-0"
81'-0" LOBBY C LOBBY D LOBBY A LOUNGE ALEASING FITNESS MEP MEP MEP BIKES (40) BIKES (40) BIKES (40) BIKES (40) CLUB ROOM A CLUB ROOM B MEP STO ENCL. 1 ENCL. 3 ENCL. 2 1A3.2 1A4.1 2A3.2 1A3.1 1A3.2 2A4.1 1A3.4 1A3.6 COVERED TRELLIS CONNECTION TO RETAIL PLAN AT GROUND LEVEL A2.1 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1- GROUND LEVEL PLAN 1/64"=1'-0" @ 11x17 1/32"=1'-0" @ 24x36 0 16 32 32 N

Page 126 of 945 ends

NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' COURTYARD B LOBBY B COURTYARD A
86'-0"
81'-0"
86'-0"
81'-0" LOBBY C LOBBY D LOBBY A 1A3.2 1A4.1 2A3.2 1A3.1 1A3.2 2A4.1 1A3.4 1A3.6 PLAN AT LEVELS LEVELS 2, 3, & 4 A2.2 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1- PLAN AT LEVELS 2, 3 & 4 1/64"=1'-0" @ 11x17 1/32"=1'-0" @ 24x36 0 16 32 32 N

Page 127 of 945 ends

NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18'
9' x 18' 9' x 18' 9' x 18'
9' x 18' 9' x 18' COURTYARD B LOBBY B COURTYARD A
86'-0"
81'-0"
86'-0"
81'-0" LOBBY C LOBBY D LOBBY A COMM. ROOM 540 SF WC ROOF DECK 575 SF 1A3.2 1A4.1 2A3.2 1A3.1 1A3.2 2A4.1 1A3.4 1A3.6 PLAN AT LEVEL LEVEL 5 A2.3 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1- PLAN AT LEVEL 5 1/64"=1'-0" @ 11x17 1/32"=1'-0" @ 24x36 0 16 32 32 N

Page 128 of 945 ends

36'-6" 11'-0" 12'-6" 11'-0" 36'-6" 11'-0" 12'-6" 25'-0" 16'-6" 17'-6" 14'-0"
31'-0"
15'-712" 31'-0" 25'-0"15'-712" 31'-0"
14'-0"
31'-0" 17'-6" TWO-BEDROOM AT LEVELS 2, 3 & 4 1,162 SF TWO-BEDROOM AT LEVEL 6 1,126 SF ONE-BEDROOM AT LEVELS 2, 3 & 4 805 SF ONE-BEDROOM AT LEVEL 5 771 SF STUDIO AT LEVELS 2, 3 & 4 573 SF STUDIO AT LEVEL 5 540 SF TWO-BEDROOM AT GROUND LEVEL 1,126 SF ONE-BEDROOM AT GROUND LEVEL 771 SF STUDIO AT GROUND LEVEL 532 SF 11'-9" 15'-6" 14'-0" 42'-3" TWO-BEDROOM PLUS OFFICE AT GROUND LEVEL 1,288 SF 27'-6" TWO-BEDROOM PLUS OFFICE AT LEVELS 2 & 3 1,288 SF 42'-3" 27'-6"
35'-0" TWO-BEDROOM PLUS OFFICE AT LEVELS 51 ,288 SF 42'-3" 27'-6"
35'-0" 35'-0" UNIT PLANS A2.4 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1- UNIT PLANS 1/16" = 1'-0" @ 11 x 17" 1/8" = 1'-0" @ 24 x 36"

Page 129 of 945 ends

23'-0"
22'-6" 15'-0" 16'-0" TYPICAL ENCLOSURE PLAN (TYPICAL OF 3 LOCATIONS) 4CY ORGANICS 4CY RECYCLING 4CY WASTE 4CY RECYCLING 4CY WASTE 4CY EXTRA BIN FLOOR GUIDE RAIL FOR BINS 3' ACCESS-DOOR 3' ACCESS-DOOR BIN PICKUP GATE BIN PICKUP GATE BIN PICKUP GATE TRASH & RECYCLING ENCLOSURE PLANS A2.5 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1- WASTE AND RECYCLING CALCULATIONS AND ENCLOSURE LAYOUTS 3/32" = 1'-0" @ 11 x 17" 3/16" = 1'-0" @ 24 x 36"

Page 130 of 945 ends

12'-9" 10'-3"10'-3"11'-0"
54'-6" BUILDING HEIGHT
10'-3" 9'-0"
75'-0" HEIGHT LIMIT 75' HEIGHT LIMIT 90' TO ELEVATORS
12'-9" 10'-3"10'-3"11'-0"
54'-6" BUILDING HEIGHT
10'-3" 9'-0"
75'-0" HEIGHT LIMIT 75' HEIGHT LIMIT 90' TO ELEVATORS SITE ELEVATIONS 1 A3.1 - NORTH ELEVATION - - 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 2- WEST ELEVATION - -

Page 131 of 945 ends

12'-9" 10'-3"10'-3"11'-0"
54'-6" BUILDING HEIGHT
10'-3" 9'-0"
75'-0" HEIGHT LIMIT 75' HEIGHT LIMIT 90' TO ELEVATORS
12'-9" 10'-3"10'-3"11'-0"
54'-6" BUILDING HEIGHT
10'-3" 9'-0"
75'-0" HEIGHT LIMIT 75' HEIGHT LIMIT 90' TO ELEVATORS SITE ELEVATIONS 1 A3.2 - SOUTH ELEVATION - - 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 2- EAST ELEVATION - -

Page 132 of 945 ends

MATERIALS AND COLOR BOARD 1 A3.3 - MATERIALS AND COLORS - - 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL CONCRETE BASE AND PLANTERS ALUMINUM WINDOWS PAINTED TRIM WARM WHITE PLASTER PAINTED TRIM ACCENT COLOR PLASTER, SMOOTH FINISH HORIZONTAL SIDING WARMWHITE PLASTER, SMOOTH FINISH VINES AT GROUND LEVEL CONCRETE BASE AND PLANTERS ACCENT COLOR PLASTER JULIET BACLONIES HORIZONTAL SIDING PLANTED GROUND FLOOR ROOF DECK GROUND LEVEL LOUNGE

Page 133 of 945 ends

CONCEPTUAL RENDERING
1 A3.4 - VIEW OF MAIN PROJECT ENTRY
- - 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL

Page 134 of 945 ends

CONCEPTUAL RENDERING A3.5 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1 - GROUND LEVEL DETAIL VIEW
- -

Page 135 of 945 ends

CONCEPTUAL RENDERING A3.6 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1 - VIEW FROM PEDESTRIAN PATH TO RETAIL CENTER
- -

Page 136 of 945 ends

CONCEPTUAL RENDERING A3.7 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1 - VIEW OF WEST ENTRANCE
- -

Page 137 of 945 ends

CONCEPTUAL RENDERING A3.8 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1 - SIDEWALK DETAIL ALONG WEST FACADE
- -

Page 138 of 945 ends

CONCEPTUAL RENDERING A3.9 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL 1 - EVENING VIEW FROM PLAZA
- -

Page 139 of 945 ends

EXISTING RETAIL EXISTING RESIDENTIAL COURTYARD A COURTYARD B FITZGERALD DR. cadcoaching.co.uk cadcoaching.co.uk 12'-9" 10'-3"10'-3"11'-0" 54'-6" BUILDING HEIGHT
10'-3" 9'-0"
75'-0" HEIGHT LIMIT TO ROOF STAIR TO ROOF
9'-0"
VARIES 40' - 50'
TO STREETS ABOVE 75' HEIGHT LIMIT 90' TO ELEVATORS cadcoaching.co.uk cadcoaching.co.uk cadcoaching.co.uk cadcoaching.co.uk CLUB ROOM cadcoaching.co.uk cadcoaching.co.uk BEST BUY EXISTING RETAIL 12'-9" 10'-3"10'-3"11'-0"
54'-6" BUILDING HEIGHT
10'-3" 9'-0"
75'-0" HEIGHT LIMIT TO ROOF COURTYARD A cadcoaching.co.uk 75' HEIGHT LIMIT TO ROOF 90' HEIGHT LIMIT TO ELEVATORS SITE SECTIONS 1 A4.1 - EAST-WEST SECTION (LOOKING SOUTH) 1/64" = 1'-0" @ 24 x 36" 1/32" = 1'-0" @ 24 x 36" 2- NORTH-SOUTH SECTION (LOOKING EAST) 1/64" = 1'-0" @ 24 x 36" 1/32" = 1'-0" @ 24 x 36" 1500 FITZGERALD DR, PINOLE, CA 94564 PINOLE VISTA ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF TRACHTENBERG ARCHITECTS JOB 1924 SHEET
 PLANNING SUBMITTAL 2421 Fourth Street Berkeley, California 94710 510.649.1414 www.TrachtenbergArch.com TRACHTENBERG ARCHITECTS 21  PLANNING SUBMITTAL  PLANNING SUBMITTAL  PLANNING SUBMITTAL   PLANNING SUBMITTAL  PLANNING SUBMITTAL

Page 140 of 945 ends

W W W W W

FW FW FW FW FW SD SD SD SD SD SD
SD SD SD SD SD W W W W W W W W SD SD SD SD SD SD W W W W FITZGERALD DRIVE PINOLE MIXED USE adobe associates, inc. 1220 N. Dutton Ave., Santa Rosa, CA 95401 P. (707) 541-2300 F. (707) 541-2301 Website: www.adobeinc.com "A Service You Can Count On!" civil engineering I land surveying I wastewater NOT FOR CONSTRUCTION EXISTING CONDITIONS PLAN C1.0

EXISTING CONDITIONS PLAN

Page 141 of 945 ends

W W W W W

FW FW FW FW FW SD SD SD SD SD SD

SS SS SS SS SS SS

SD SD SD SD SD W W W W W W SS SS SS SD SD SD SD SD SD SS SS SS SS W W W W Ex Building
FITZGERALD DRIVE PINOLE MIXED USE adobe associates, inc. 1220 N. Dutton Ave., Santa Rosa, CA 95401 P. (707) 541-2300 F. (707) 541-2301 Website: www.adobeinc.com "A Service You Can Count On!" civil engineering I land surveying I wastewater NOT FOR CONSTRUCTION DEMOLITION PLANS DEMOLITION TABLE 1458
SYMBOL DEMOLITION FEATURE 3UNITS QUANTITY *
* 6 1 1 2 8 8 7 4 5 4 DEMOLITION PLANS
C1.1 2 2 3 4 6 7 7 8 4

Page 142 of 945 ends

NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING

PROPOSED
BLDG
215.50 SLAB
214.50 PAD
215.50 FF
214.50 PAD
214.50 SLAB
213.50 PAD

LOBBY B FITZGERALD DRIVE

LOBBY C
214.50 SLAB
213.50 PAD
214.50 SLAB
213.50 PAD

LOBBY A

PROPOSED
BLDG
MATCHLINE - SEE SHEET C2.1
FOR CONTINUATION PINOLE MIXED USE adobe associates, inc. 1220 N. Dutton Ave., Santa Rosa, CA 95401 P. (707) 541-2300 F. (707) 541-2301 Website: www.adobeinc.com "A Service You Can Count On!" civil engineering I land surveying I wastewater NOT FOR CONSTRUCTION

GRADING & DRAINGE PLAN GRADING & DRAINAGE PLAN
C2.0

Page 143 of 945 ends

NO PARKING NO PARKING
215.50 SLAB
214.50 PAD

LOBBY D
214.50 SLAB
213.50 PAD

PROPOSED
BLDG
MATCHLINE - SEE SHEET C2.0
FOR CONTINUATION PINOLE MIXED USE adobe associates, inc. 1220 N. Dutton Ave., Santa Rosa, CA 95401 P. (707) 541-2300 F. (707) 541-2301 Website: www.adobeinc.com "A Service You Can Count On!" civil engineering I land surveying I wastewater NOT FOR CONSTRUCTION GRADING & DRAINAGE PLAN GRADING & DRAINAGE PLAN C2.1

Page 144 of 945 ends

SD W W W W W W W

FW FW FW FW FW FW FW SD SD SD SD SD SD SD SD SD W W W W W SD SD SD NO PARKING NO PARKING NO PARKING NO PARKING SD SD SD SD SD SD SD W W W W W W W NO PARKING NO PARKING W FITZGERALD DRIVE

PROPOSED
BLDG
215.50 SLAB
214.50 PAD
215.50 FF
214.50 PAD
214.50 SLAB
213.50 PAD

LOBBY B

LOBBY C
214.50 SLAB
213.50 PAD
214.50 SLAB
213.50 PAD

LOBBY A

PROPOSED
BLDG
MATCHLINE - SEE SHEET C3.1
FOR CONTINUATION PINOLE MIXED USE adobe associates, inc. 1220 N. Dutton Ave., Santa Rosa, CA 95401 P. (707) 541-2300 F. (707) 541-2301 Website: www.adobeinc.com "A Service You Can Count On!" civil engineering I land surveying I wastewater NOT FOR CONSTRUCTIONUTILITY PLAN

UTILITY PLAN
C3.1
KEY NOTES 1 1

Page 145 of 945 ends

W W FW FW SD SD

SD SD SD SD SD SD SD SD W W W W NO PARKING NO PARKING
215.50 SLAB
214.50 PAD

LOBBY D
214.50 SLAB
213.50 PAD

PROPOSED
BLDG
MATCHLINE - SEE SHEET C3.0
FOR CONTINUATION PINOLE MIXED USE adobe associates, inc. 1220 N. Dutton Ave., Santa Rosa, CA 95401 P. (707) 541-2300 F. (707) 541-2301 Website: www.adobeinc.com "A Service You Can Count On!" civil engineering I land surveying I wastewater NOT FOR CONSTRUCTION

UTILITY PLAN UTILITY PLAN
C3.0

Page 146 of 945 ends

LD DRIVE
FITZGERALD DRIVE SIGNING & STRIPING PLAN NOTE: PINOLE MIXED USE adobe associates, inc. 1220 N. Dutton Ave., Santa Rosa, CA 95401 P. (707) 541-2300 F. (707) 541-2301 Website: www.adobeinc.com "A Service You Can Count On!" civil engineering I land surveying I wastewater NOT FOR CONSTRUCTION

Page 147 of 945 ends
Page 148 of 945 ends
Page 149 of 945 ends
Page 150 of 945 ends

PIN
O
L
E
MIX
E
D
-
U
S
E
1 5
0 0
FIT
Z
G
E
R
A
L
D
D
RIV
E
PIN
O
L
E, C
A
9 4
5 6
4 DATE:

MLA JOB #:

SCALE:

DRAWN:
2020-28
1" = 30'
DM
L1.4
SHEET L1.4 OF 6
T
R
E
E IM
A
G
E
S
8/13/22
C2022 MACNAIR LANDSCAPE ARCHITECTURE, NOT FOR
GENERAL USE OR PUBLICATION, ALL RIGHTS RESERVED.

THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY
OF MACNAIR LANDSCAPE ARCHITECTURE. MACNAIR

LANDSCAPE ARCHITECTURE IS NOT RESPONSIBLE FOR THE

ACCURACY OF ANY PLANS OR SURVEYS NOT DIRECTLY
PREPARED BY THEM. SITE DIMENSIONS, GRADES, WATER

PRESSURES AND GENERAL CONDITIONS SHALL BE VERIFIED
PRIOR TO BEGINNING OF ANY WORK ON SITE. WRITTEN

DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED
DIMENSIONS.

L A N D S C A P E

A R C H I T E C T U R E
P O S T O F F IC E B O X 2 5 1
K E N W O O D , C A L I F O R N IA 9 5 4 5 2
TEL (707) 833-2288
RLA #2800
[email protected]

MACNAIR
NO. 2800
EXP. 8/31/23

PISTACIA CHINENSIS 'KEITH DAVEY' OLEA EUROPAEA 'SWAN HILL' E D
U
S
E

ULMUS PARVIFOLIA 'DRAKE' MORELLA CALIFORNICA QUERCUS AGRIFOLIA

ACER PALMATUM 'BLOODGOOD' ACER RUBRUM 'ARMSTRONG' CORNUS 'EDDIES WHITE WONDER' A ' ACER PALMATUM 'SERIYU' LAGERSTROMIA INDICA 'NATCHEZ'

LYONOTHAMNUS
FLORIBUNDUS SUBSP. ASPLENIIFOLIUS E '

CERCIS OCCIDENTALIS

QUERCU QUERCUS TOMENTELLA

Page 151 of 945 ends

PIN
O
L
E
MIX
E
D
-
U
S
E
1 5
0 0
FIT
Z
G
E
R
A
L
D
D
RIV
E
PIN
O
L
E, C
A
9 4
5 6
4 DATE:

MLA JOB #:

SCALE:

DRAWN:
2020-28
1" = 30'
DM
L1.5
SHEET L1.5 OF 6
F
E
N
C
E
E
X
HIBIT
8/13/22
C2022 MACNAIR LANDSCAPE ARCHITECTURE, NOT FOR
GENERAL USE OR PUBLICATION, ALL RIGHTS RESERVED.

THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY
OF MACNAIR LANDSCAPE ARCHITECTURE. MACNAIR

LANDSCAPE ARCHITECTURE IS NOT RESPONSIBLE FOR THE

ACCURACY OF ANY PLANS OR SURVEYS NOT DIRECTLY
PREPARED BY THEM. SITE DIMENSIONS, GRADES, WATER

PRESSURES AND GENERAL CONDITIONS SHALL BE VERIFIED
PRIOR TO BEGINNING OF ANY WORK ON SITE. WRITTEN

DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED
DIMENSIONS.

L A N D S C A P E

A R C H I T E C T U R E
P O S T O F F IC E B O X 2 5 1
K E N W O O D , C A L I F O R N IA 9 5 4 5 2
TEL (707) 833-2288
RLA #2800
[email protected]

MACNAIR
NO. 2800
EXP. 8/31/23

GETTY CENTER PARKVIEW SCHOOL
TYPICAL GREENSCREEN INSTALLATIONS 4
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

FENCE EXHIBIT
Scale: 1"= 40'-0"
4 L1.5

TYPICAL GREENSCREEN

INSTALLATIONS
1 L1.5

STEEL PICKET PARKING

LOT GATE
3 L1.5

BLACK VINYL-COATED

CHAINLINK FENCE
2 L1.5

EXISTING CHAINLINK
FENCE
1 L1.5

STEEL PICKET

PARKING LOT
GATE
5 L1.5 GREENSCREEN DETAIL
4 L1.5

TYPICAL GREENSCREEN

INSTALLATIONS

FENCE LEGEND

STEEL PICKET

PARKING LOT GATE

EXISTING CHAINLINK
FENCE

BLACK VINYL-COATED

CHAINLINK FENCE

GREENSCREEN FENCE
HORIZONTAL PANEL MAX 96" IN 2" INCREMENTS
POST TO POST CLEAR = PANEL
POST TO POST CTRS = PANEL + 4" LENGTH, TYP. 3" ROUND OR SQ. STEEL POST WITH POST CAP. TYP. #5104 CHANNEL TRIM OR #5105 STEEL EDGE TRIM, RECOMMENDED AT TOP EDGE OF PANEL, TYP. #5133X SNAP CLIPS W/ STAINLESS STEEL SCREW, TYP. PANEL TRIM OPTIONAL WITH #5133X OPTIONAL: 5141 “C” CLIP W/ #5105 EDGE TRIM REQUIRED @ VERTICAL EDGES USE #5142 + #5136.25 SPACER 3” THICK GREENSCREEN® PANEL, TYP.
#5105 STEEL EDGE TRIM RECOMMENDED @ BOTTOM EDGE OF PANEL

FINISH GRADE
NOTE: SPECIFIC ENGINEERING MAY BE REQUIRED BASED ON SITE SPECIFIC SOIL CONDITIONS, LOCAL WIND LOADS, AND VERTICAL HEIGHT OF FENCE/SCREEN. 3” THICK GREENSCREEN® PANEL,
4 TYP. 8" M
AXIMUM

PANEL HEIGHT
6"± VERIFY
VERIFY
PLAN
ELEVATION POST IMBED LENGTH & FOOTING SIZE SHOULD BE VERIFIED BASED ON OVERALL HEIGHT, WINDLOADS & SOIL CONDITIONS.

LENGTH + 1" TYP.

CL
CL
CL
CL
GREENSCREEN DETAIL 5
STEEL PICKET PARKING LOT GATE 1 EXISTING CHAINLINK FENCE 2 BLACK VINYL-COATED CHAINLINK FENCE 3

Page 152 of 945 ends

T
HESEDRAWINGSCOMPLYWITHTHECRITERIAOFTHEORDINANCE.

ORDINANCEREQUIREMENTSHAVEBEENAPPLIEDFORTHEEFFICIENT

USEOFWATERINTHEIRRIGATIONDESIGNPLANANDTHELANDSCAPE
DESIGNPLAN.”
U.S.A NOTE

ITISTHERESPONSIBILITYOFTHELANDSCAPECONTRACTORTOBEFAMILIARWITHALL GRADEDIFFERENCES,LOCATIONOFWALLS,STRUCTURES,ANDUTILITIES.THEIRRIGATION

CONTRACTORSHALLEXERCISEEXTREMECARE,ANDBERESPONSIBLEFORANYDAMAGEIN EXCAVATINGANDWORKINGNEARUTILITIES.THELANDSCAPECONTRACTORSHALL

COORDINATEALLWORKWITHTHEOTHERSUB-CONTRACTORSFORTHELOCATIONOF

UTILITIESANDTHEINSTALLATIONOFPIPESLEEVESTHROUGHWALLS,UNDERROADWAYS,AND NEARSTRUCTURES.PRIORTOCONSTRUCTION,CONTACTALLAPPLICABLEAGENCIESAND U.S.A.AT1-800-642-2444OR1-800-227-2600TOFIELDLOCATEALLEXISTINGUTILITIES.

PINOLE MIXED-USE
1500 FITZGERALD DRIVE
PINOLE, CA 94564
DATE:

MLAJOB#:

SCALE:

DRAWN:
2020-28
1"=30'
DM
L2.1
SHEETL2.1
OF
6 CONCEPT IRRIGATION
PLAN 9/13/
22 C2022MACNAIRLANDSCAPEARCHITECTURE,NOTFOR
GENERALUSEORPUBLICATION,ALLRIGHTSRESERVED.

THESEDRAWINGSANDSPECIFICATIONSARETHEPROPERTY
OFMACNAIRLANDSCAPEARCHITECTURE.MACNAIR

LANDSCAPEARCHITECTUREISNOTRESPONSIBLEFORTHE

ACCURACYOFANYPLANSORSURVEYSNOTDIRECTLY
PREPAREDBYTHEM.SITEDIMENSIONS,GRADES,WATER

PRESSURESANDGENERALCONDITIONSSHALLBEVERIFIED
PRIORTOBEGINNINGOFANYWORKONSITE.WRITTEN

DIMENSIONSSHALLTAKEPRECEDENCEOVERSCALED
DIMENSIONS.

LANDSCAPE

ARCHITECTURE
POSTOFFICEBOX251
KENWOOD,CALIFORNIA95452
TEL(707)833-2288
RLA#2800
[email protected]

MACNAIR
NO.2800
EXP.8/31/23

CONCEPT HYDROZONE DETAIL TABLE
NameMethodWater Use
Water Use
Value
Hydrozone Area in
SF
% of
Landscape
BioretentionEco-MatLow0.38,624.15sf21.2%
LawnOverheadSprayModerate0.6541.77sf1.3%
PatioPlantersSub-SurfaceDriplineLow0.3172.86sf0.4%
PatioPlantersSub-SurfaceDriplineModerate0.6700.52sf1.7% RoofSub-SurfaceDriplineModerate0.693.45sf0.2%
ShrubAreasSub-SurfaceDriplineLow0.326,062.29sf64.1%
TreeRootWateringSystemVeryLow0.1226.19sf0.6%
TreeRootWateringSystemLow0.32,575.67sf6.3%
TreeRootWateringSystem---0.61,571.35sf3.9%
WaterFeatureWaterFeatureHigh188.27sf0.2%
40,657sf100%

CONCEPTSUMMARYHYDROZONETABLE
PLANT TYPEAREA% OF LANDSCAPE
VeryLow254.471%
Low37,434.9692%
Moderate2,878.817%
High88.270%
Total40,656.51100%

MAWA AND ETWU CALCULATIONS
1)
MaximumAppliedWaterAllowance(MAWA)
MAWA=(ETo)(0.62)[(0.55XLA)+(0.45XSLA)]
Where:

ETo=AnnualNetReferenceEvapotranspiration(Inches)

0.45=ETAdjustmentFactor(Commercial)

0.55=ETAdjustmentFactor(Residential)
LA=LandscapedArea(squarefeet)

0.62=Conversionfactor(togallonspersquarefoot)
SLA=PortionofthelandscapeareaidentifiedasSpecialLandscapeArea(squarefeet)

0.45=theadditionalETadjustmentfactorforSpecialLandscapeArea(1.0-0.55=0.45)(Commercial)

0.55=theadditionalETadjustmentfactorforSpecialLandscapeArea(1.0-0.45=0.55)(Residential) Commercial(C)orResidential(R)C
A)NetEvapotranspirationCalculation
LocalReferenceETo41.80

26.70"/yr
X.25=

6.68 (AnnualRainfall)(EffectiveRainfall)
NetEvapotranspirationCalculation=AnnualETo-EffectiveRainfall=35.13 B)AdjustedLandscapeAreaCalculation
40,656sfX0.45=18,295.42sf
(LandscapeArea)AdjustmentFactor

0.00sfX0.55=0.00sf
(SpecialLandscapeArea)AdjustmentFactor
SumofAdjustedLandscapeArea=18,295.42sf
MAWA=35.125X .62 X18,295 sf=398,429 gal/yr
2)
EstimatedTotalWaterUse(ETWU)
A)NetEvapotranspirationCalculation=35.13sf
NetEvapotranspirationCalculation=AnnualETo-EffectiveRainfall B)AdjustedLandscapeAreaCalculation
254.47sfX.125.45sf
VeryLowWaterUse
37,435sfX.311,230.49sf
LowWaterUse
2,879sfX.61,727.29sf
ModerateWaterUse

88.27sfX.87.06sf
HighWaterUse/WaterFeature
SumofAdjustedLandscapeArea=12,990.28sf
ETWU =35.13X .62 X12,990 sf/0.81=353,620 gal/yr
Irrigation Efficiency Factor
Square Footage of Landscape on Drip
40,026.45sf
Square Footage of Landscape on Spray
541.77sf
TotalSquareFootageofLandscape
40,568.22sf
AdjustedIrrigationEfficiencyFactor

0.81 EQUIPMENT MANUFACTURER MODEL REMARKS
STREAM BUBBLER: 6" POP-UP HUNTER PROS-06-CV-R-PRS30-MSBN-25Q TREE WELL BUBBLER, AIM AT ROOT BALL; 1 PER TREE ROOT WATERING SYSTEM HUNTER RZWS-18-25-CV 1 PER TREE
1" NORMALLY CLOSED MASTER VALVE HUNTER ICV-101G INSTALL DOWNSTREAM FROM BACKFLOW PREVENTER REMOTE CONTROL VALVE: TREE BUBBLER HUNTER ICV-101G-AS-ADJ TREE BUBBLER CIRCUIT VALVE; SEE PLAN FOR SIZE REMOTE CONTROL VALVE: DRIP CIRCUIT HUNTER ICZ-101-LF-25, ICZ-101-25 DRIP CIRCUIT VALVE 6 STATION BASE CONTROLLER (2 WIRE CONFIGURATION) HUNTER IC-600-SS MOUNT ON PANEL AT EYE LEVEL DUAL DECODER MODULE HUNTER DUAL -1, DUAL -2, DUAL -S

DUAL SURGE ARRESTOR HUNTER DUAL -S
DUAL DECODER OUTPUT MODULE HUNTER DUAL-48M

SOLAR SYNC SENSOR (WIRELESS) HUNTER WSS-SEN MOUNT AT ROOF LINE ABOVE CONTROLLER LOCATION R.P. BACKFLOW PREVENTER - 1" FEBCO 860U
BACK FLOW PREVENTER ENCLOSURE LE MEUR BF 18" X 30" X 30" INSTALL PER MANUF. SPECS QUICK COUPLER W/ COVER CHAMPION QCV-075V SEE PLAN FOR SIZE BALL VALVE IN VALVE BOX WATTS B6400 SERIES MATCH MAINLINE SIZE; REFER TO DETAIL AUTOMATIC LINE FLUSH VALVE HUNTER AFV-T INST. IN 6" VALVE BOX @ END OF CIRCUIT AIR RELIEF VALVE HUNTER AVR-075 INST. IN 6" VALVE BOX @ HIGH POINT OF CIRCUIT PIPE AND WIRE CHASE PVC CL 200 SEE PLAN FOR SIZE
SUB-SURFACE BIOSWALE IRRIGATION HUNTER ECO-MAT 17MM INSTALL 4" BELOW GRADE ALL BIOSWALE AREAS POLY TO PVC CONNECTOR W/ COMPRESSION FITTING SEE DETAIL G/L3 LANDSCAPE DRIPLINE RAINBIRD XFS-06-12-XX INSTALL 3" BELOW GRADE @ SPACING SHOWN MAINLINE PVC SCH 40 (1-1/2" AND SMALLER)
LATERAL PVC SCH 40
FLOW SENSOR CST FSI-T10-000 INSTALL AT POINT OF CONNECTION

WATER METER REFER TO CIVIL DRAWINGS

TYPICALIRRIGATIONEQUIPMENT
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
NO
PARKI
NG
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1 1
1 1
1 11
11 11
2 3
3 12
12 13
8 5
9 4
4 4
4 4
4 10
7 6

IRRIGATIONANDHYDROZONEKEYNOTES

1. 2
.

3. 4.

5. 6.

7. 8
.

9. 10.

11. 12.

13. CROSSHATCHEDAREASINDICATEBIORETENTIONWITHECOMAT
GREENAREADESIGNATES"LOWWATERUSE"PLANTSPECIES
YELLOWAREADESIGNATES"MODERATEWATERUSE"PLANT

SPECIES

INGROUNDPLANTERAREASINPATIOS
INSTALLDRIPLINE3"BELOWGRADEINALLRAISEDPLANTERS
AT24"OCTYPICAL;ALLDRIPLINESHALLBEINSTALLED
PARALLELANDHELDBACKFROMEDGE1/2THEROW
SPACING.

ROOFTOPTERRACE

LAWNAREA(OROPTIONALARTIFICIALTURF)
TREEBUBBLERS,TWOPERTREE,TYPICAL.ONEABOVEGRADE

STREAMBUBBLERANDONESUB-SUFACEBUBBLER
ECO-MAT:INSTALL4"BELOWGRADEINBIORETENTIONAREAS
AT14"OC;LOWWATERUSE,TYPICAL
4'SQUARETREEWELLWITHTREEGRATE,TYPICALINPAVED
AREAS
BLUEAREADESIGNATES"VERYLOWWATERUSE"PLANT

SPECIES
WATERFEATURE-"HIGHWATERUSE"
TREEHYDROZONEAREASARECALCULATEDWITHA6'WETTED
DIAMETER(28.26SFPERTREE).

FITZGERALD
DRIVE

CONCEPTIRRIGATIONPLAN
Scale:1"=30'-0"

Page 153 of 945 ends

NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING

PARKING
NO

PARKING
NO

PARKING
NO
NO
PARKING BBBB BB CC CC CCCCCCCC CC BB EE DD DD DD DD DD GG GG GG GG GG GG GGGG EE EE GG GG GG GG GG GG GG GG GGGG FF FF FF FF FF FF FF 0.57 3.14 10.38 12.00 3.91 1.18 3.07 9.63 11.79 4.09 1.30 3.14 9.93 11.66 3.98 1.29 2.16 4.80 5.00 2.41 0.97 0.66 0.76 0.76 0.37 1.33 1.21 0.59 2.21 5.84 6.39 2.73 1.13 2.18 5.82 6.62 2.83 1.21 2.22 5.88 6.55 2.76 1.30 3.38 9.51 9.91 3.86 0.53 1.57 1.34 1.02 1.35 1.82 0.91 0.83 1.31 1.96 1.04 0.67 10.01 3.58 2.10 1.72 1.44 0.55 0.74 0.42 0.57 0.57 0.62 0.66 0.64 0.19 3.75 2.52 1.72 2.37 2.03 1.41 1.37 0.77 0.68 0.70 0.75 0.72 0.74 0.21 1.43 1.30 1.40 1.93 2.07 1.83 1.60 0.87 1.42 0.70 0.96 1.16 0.99 0.89 0.85 0.85 0.85 0.88 0.85 0.84 0.79 0.80 0.24 1.31 1.31 1.86 1.87 1.74 1.56 1.37 0.69 0.94 1.14 1.15 1.00 0.91 0.89 0.95 1.10 1.27 1.26 1.07 0.90 0.82 0.82 0.90 1.07 1.25 1.29 1.24 1.78 1.80 1.68 1.52 1.34 0.60 0.77 0.90 0.73 0.84 0.85 0.90 1.11 1.13 0.99 0.89 0.80 0.78 0.26 1.10 1.34 1.85 1.78 1.76 1.56 1.37 0.78 0.96 0.88 0.83 0.75 0.71 0.25 1.24 1.24 1.28 1.73 2.10 2.13 1.53 0.71 1.43 0.72 0.77 0.57 0.79 0.73 0.72 0.69 0.60 0.23 3.48 2.29 1.26 2.24 1.87 1.47 1.39 1.06 1.64 2.34 1.10 1.06 1.69 2.24 1.16 0.74 9.04 3.15 2.12 1.75 1.47 0.53 2.24 6.71 7.32 2.68 1.18 2.48 7.04 7.31 2.73 1.25 2.53 6.87 7.05 2.58 1.25 3.63 9.60 9.88 3.47 0.55 1.58 1.37 3.16 11.22 12.55 3.80 1.22 3.43 11.80 12.36 3.73 1.23 3.49 11.67 12.04 3.64 1.20 2.33 5.01 4.92 2.20 0.42 1.36 1.22 3.52 9.13 3.39 8.89 3.54 8.98 0.97 0.93 0.89 1.45 5.20 11.55 7.46 2.25 1.48 5.01 12.39 7.90 2.51 1.67 5.23 12.62 7.77 2.54 1.18 2.90 5.71 4.90 2.23 1.03 1.09 1.21 1.21 1.10 0.98 0.94 1.07 3.13 6.33 4.51 1.56 1.22 3.16 6.61 4.96 1.76 1.34 3.29 6.68 4.90 1.83 1.41 4.60 10.09 8.92 3.22 1.17 1.27 1.43 1.11 0.83 0.45 0.96 1.85 2.13 1.07 0.97 1.50 1.94 1.64 1.18 3.67 10.67 1.45 1.43 1.24 1.10 1.01 3.94 2.55 0.60 0.59 0.57 0.58 0.63 0.75 2.57 3.65 1.29 1.29 1.20 1.10 1.02 11.09 5.97 0.66 0.63 0.62 0.65 0.72 0.84 1.14 1.22 1.12 1.16 1.19 1.14 1.08 1.02 2.82 7.54 10.16 5.69 1.68 0.55 0.62 0.77 0.87 0.87 0.79 0.72 0.69 0.73 0.82 0.95 1.07 1.12 1.09 1.04 1.03 1.06 1.07 0.74 1.10 1.05 1.01 2.79 4.69 6.39 4.15 1.99 0.62 0.71 0.95 1.11 1.08 0.90 0.80 0.76 0.79 0.91 1.09 1.30 1.36 1.23 1.12 1.07 0.96 0.93 0.99 1.05 1.01 2.79 8.83 11.55 6.11 1.76 0.60 0.72 0.97 1.13 1.09 0.92 0.81 0.77 0.81 0.92 1.13 1.36 1.42 1.28 1.14 1.10 1.10 1.11 0.89 0.91 1.12 1.07 1.02 10.21 5.39 1.62 1.63 1.23 1.22 1.18 1.10 1.04 3.06 2.12 2.94 4.30 1.40 1.30 1.17 1.13 1.06 1.85 2.53 4.28 11.97 1.54 1.46 1.19 1.07 1.16 3.63 7.99 4.88 1.78 1.48 4.08 8.24 4.85 1.86 1.59 4.09 8.06 4.88 1.99 1.49 4.60 12.00 8.53 3.31 1.26 1.32 1.46 1.14 0.89 1.03 1.02 1.58 5.60 13.70 7.66 2.30 1.93 6.29 15.58 7.43 2.29 2.01 6.43 15.05 7.76 2.41 1.23 2.90 5.11 4.54 2.24 1.09 1.09 1.17 1.23 1.14 1.04 1.01 1.01 0.91 1.28 1.09 1.64 1.26 1.02 1.38 2.05 1.44 1.19 1.77 2.36 1.54 1.32 2.14 2.43 1.53 1.39 2.40 2.25 1.60 1.32 2.22 1.94 1.60 1.43 1.87 1.62 1.52 0.98 0.92 0.85 0.78 0.73 0.67 0.59 0.52 1.01 1.32 1.54 1.32 1.36 1.37 1.41 1.61 1.98 2.19 2.10 1.78 1.48 1.24 1.13 1.16 1.31 1.56 1.87 2.05 2.04 1.85 1.56 1.33 1.21 1.21 1.34 1.53 1.75 1.85 1.82 1.67 1.43 1.24 1.10 1.02 0.97 0.90 0.78 0.88 1.05 1.19 1.26 1.02 1.11 1.20 1.37 1.74 2.36 2.78 2.58 1.99 1.50 1.14 1.00 1.05 1.28 1.68 2.23 2.71 2.69 2.21 1.70 1.34 1.16 1.18 1.40 1.77 2.29 2.66 2.59 2.16 1.73 1.42 1.28 1.23 1.23 1.19 1.07 1.04 1.08 1.08 1.06 1.27 1.37 1.49 1.47 1.32 1.16 1.08 1.11 1.42 1.75 1.79 1.51 1.24 1.06 2.52 1.62 1.09 0.95 1.14 1.66 2.52 2.49 1.49 0.87 0.61 0.61 0.90 1.56 2.55 2.35 1.49 1.05 0.86 0.81 0.86 0.94 0.94 0.94 0.84 0.67 0.51 2.06 2.22 1.71 1.20 1.04 1.11 1.44 1.88 1.82 1.29 0.88 0.77 0.78 0.90 1.32 1.82 1.76 1.31 1.05 0.99 1.01 1.17 1.38 1.33 1.37 1.14 0.81 0.58 1.38 1.61 1.35 1.05 0.94 0.95 1.05 1.15 1.09 0.88 0.73 0.69 0.69 0.73 0.90 1.08 1.06 0.94 0.94 0.98 1.06 1.25 1.58 1.75 1.61 1.23 0.88 0.62 1.08 1.16 1.03 0.92 0.85 0.78 0.72 0.67 0.63 0.56 0.53 0.56 0.56 0.54 0.56 0.61 0.62 0.64 0.80 0.90 1.02 1.22 1.55 1.85 1.61 1.23 0.89 0.63 1.07 1.05 0.93 0.84 0.79 0.94 1.17 1.47 1.42 1.44 1.20 0.86 0.62 1.28 1.18 0.94 0.75 0.69 0.80 0.95 1.08 1.06 1.00 0.95 0.77 0.60 1.87 1.49 0.98 0.67 0.60 0.73 0.87 0.90 0.91 0.86 0.74 0.59 2.43 1.70 1.00 0.60 0.57 0.74 0.84 0.88 0.90 0.83 0.73 0.59 2.02 1.49 0.90 0.55 0.54 0.77 0.85 0.88 0.91 0.61 0.83 0.74 0.58 1.25 1.10 0.79 0.54 0.74 0.81 0.90 0.97 0.97 0.97 0.90 0.74 0.59 0.92 0.90 0.76 0.57 0.89 0.92 1.07 1.28 1.25 1.29 1.10 0.82 0.61 0.86 0.87 0.75 0.59 0.98 1.01 1.21 1.56 1.66 1.62 1.26 0.89 0.63 1.00 0.96 0.75 0.54 0.99 1.03 1.19 1.52 1.93 1.61 1.24 0.92 0.66 1.54 1.24 0.80 0.52 1.02 1.04 1.24 1.57 1.55 1.58 1.31 0.94 0.69 2.29 1.59 0.92 0.55 1.01 1.04 1.15 1.30 1.28 1.30 1.18 0.94 0.72 2.23 1.61 0.96 0.60 0.91 0.99 1.09 1.16 1.19 0.75 1.09 0.93 0.73 1.27 1.03 0.95 0.66 0.79 0.95 1.07 1.13 1.17 1.07 0.92 0.72 0.66 0.95 0.71 0.68 0.92 1.10 1.22 1.24 1.11 0.92 0.72 0.79 0.96 0.70 0.67 0.89 1.19 1.45 1.39 1.32 1.23 0.92 0.69 1.59 1.24 0.99 0.65 0.66 0.90 1.21 1.59 1.72 1.60 1.25 0.91 0.66 2.42 1.72 1.01 0.60 0.94 1.01 1.21 1.55 1.90 1.60 1.23 0.90 0.65 2.12 1.56 0.93 0.56 1.20 1.10 1.26 1.54 1.49 1.52 1.24 0.89 0.65 1.32 1.16 0.82 0.56 1.20 1.10 1.16 1.23 1.17 1.20 1.08 0.86 0.67 0.95 0.94 0.78 0.60 1.21 1.09 1.10 1.10 1.11 1.08 1.00 0.85 0.67 0.87 0.90 0.78 0.62 1.21 1.08 1.07 1.05 1.06 1.03 0.97 0.84 0.66 1.02 0.99 0.79 0.57 0.98 1.00 1.05 1.09 1.12 1.08 1.00 0.85 0.66 1.57 1.29 0.84 0.55 0.70 0.89 1.08 1.24 1.21 1.24 1.09 0.85 0.65 2.34 1.63 0.94 0.57 0.63 0.86 1.19 1.55 1.54 1.56 1.24 0.88 0.63 2.15 1.53 0.90 0.58 0.63 0.86 1.15 1.52 1.94 1.58 1.20 0.89 0.63 1.06 0.75 0.65 0.83 1.17 1.56 1.62 1.59 1.25 0.87 0.61 0.73 0.68 0.59 0.75 1.00 1.24 1.20 1.22 1.05 0.77 0.57 Luminaire Schedule - LED Project: PINOLE MIXED USE Symbol Qty Label Arrangement LLF Luminaire Lumens Luminaire Watts Description Filename 4 BB Back-Back 0.900 11141 74.35753 P26-48L-500-NW-G2-5W p26-48l-500-nw-g2-5w.ies 7 CC Single 0.900 10790 74.35753 P26-48L-500-NW-G2-4 p26-48l-500-nw-g2-4.ies 5 DD Single 0.900 2137 14.3 P15-P-A01-740-T2M @ 14' P15-P-A01-740-T2M.ies 3 EE Single 0.900 2154 14.3 P15-P-A01-740-T4S P15-P-A01-740-T4S.ies 7 FF Single 0.900 2251 14.3 P15-P-A01-740-T5S P15-P-A01-740-T5S.ies 18 GG Single 0.900 2195 23.1 PBL-42-14L-450-NW-G2-5-UNV pbl-14l-450-nw-g2-5-unv.ies Calculation Summary Description CalcType Units Avg Max Min Avg/Min Max/Min COURTYARD NORTH Illuminance Fc 2.42 12.55 0.19 12.74 66.05 COURTYARD SOUTH Illuminance Fc 2.80 15.58 0.45 6.22 34.62 NORTH PEDESTRIAN AREAS Illuminance Fc 1.49 2.78 0.52 2.87 5.35 PARKING AREAS Illuminance Fc 1.06 2.55 0.51 2.08 5.00 SCALE SHEET REV 1" = 20' 1 OF 1 05.13.2022 X DATE PHOTOMETRIC DATA USED AS INPUT FOR THESE CALCULATIONS IS BASED ON ESTABLISHED IES PROCEDURES AND PUBLISHED LAMP, RATINGS, FIELD PERFORMANCE WILL DEPEND ON ACTUAL LAMP, BALLAST, ELECTRICAL, AND SITE CHARACTERISTICS. ALL VALUES SHOWN ARE MAINTAINED HORIZONTAL FOOTCANDLES AT GRADE ASSOCIATED LIGHTING REPRESENTATIVES, INC 7777 PARDEE LANE P.O. BOX 2265 OAKLAND, CA 94621 PHONE: (510) 638-0158 - FAX (510) 638-2908 REPORT FOR: MACNAIR LANDSCAPE ARCHITECTURE BY: APPLICATIONS ENGINEERING; RAMON ZAPATA Calculations have been performed according to IES standards and good practice. Some differences between measured values and calculated results may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques and field conditions such as voltage and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectances, furniture and architectural elements significantly affect the lighting calculations. If the real environment conditions do not match the input data, differences will occur between measured values and calculated values. SALES REPRESENTATIVE: ALR; TIM HALEY * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * .PINOLE MIXED USE DRAWING NO. / INPUT FILE 19968HAL.DWG / 19968HAL.A32 PROJECT DESCRIPTION AGI32 VERSION 20.1 AGI (C) 2021 LIGHTING ANALYSTS, INC. 10268 W. CENTENNIAL ROAD, SUITE 202 LITTLETON, CO 80127

Page 154 of 945 ends

Riley F. Hurd III
[email protected]
Attorneys at Law
1101 5th Avenue, Suite 100
San Rafael, CA 94901
telephone 415.453.9433
facsimile 415.453.8269
www.rflawllp.com
April 22, 2024
Via E-Mail Only
David Hanham
Planning Manager
City of Pinole
Development Services Department
2131 Pear Street
Pinole, CA 94564
Re: Application for extension of Comprehensive Design Review (DR21-12); Tree Removal Permit; and Density Bonus Request for Pinole Vista Development (PL21-0035).

Dear Mr. Hanham:

Our office continues to represent Chris Cole/Metrovation (“Applicant”) and are assisting in Applicant’s efforts to apply for a two-year time extension of the above-referenced project approvals for the Pinole Vista Development (“Project”) located at 1500 Fitzgerald Drive, Pinole. This request is made pursuant to Pinole Municipal Code § 17.10.100.C.

The Project is a 223-unit multi-family, 5-story residential housing development located on approximately 5.9 acres at 1500 Fitzgerald Drive, Pinole. Condition 6 of the Conditions of Approval of Resolution 2022-96, states,
“Exercise of Entitlements- The applicant has two (2) years to exercise the entitlement. Entitlements shall be considered exercised when a Building Permit is are (sic) issued for the apartment structure. . . .” The Project entitlements are currently set to expire on October 18, 2024. The two-year extension is requested because despite diligent efforts to exercise the permits, market conditions have prohibited the Project from moving forward. These conditions include:
abnormally high interest rates; extremely high construction costs; lack of developer interest in a project with a union labor agreement; and rent escalation not matching

Page 155 of 945 ends
Page 2 of 2 ends

development cost escalation. Additionally, the original permit findings can be made.

There are no revisions or changes in design proposed as part of this extension request and there are no changed circumstances.

Despite these challenges, the Applicant remains committed to the completion of the Project. An extension will result in the best chance of much-needed housing being built at the site.

Thank you.

Very truly yours,
Riley F. Hurd III
CC: Client

Page 156 of 945 ends

CITY COUNCIL
REPORT 11.A.

DATE: AUGUST 20, 2024
TO: MAYOR AND COUNCIL MEMBERS
FROM: KAPIL AMIN, SUSTAINABILITY FELLOW

LILLY WHALEN, COMMUNITY DEVELOPMENT DIRECTOR
SUBJECT: APPROVE RESOLUTIONS ADOPTING AN INITIAL STUDY-NEGATIVE

DECLARATION (IS-ND) FOR THE CAAP AND ADOPTING PINOLE'S

INAUGURAL CLIMATE ACTION AND ADAPTATION PLAN (CAAP)

RECOMMENDATION
Staff recommends City Council:

1. Receive a presentation regarding Pinole's inaugural Climate Action and Adaptation Plan (CAAP)

2. Approve the draft Resolution (Attachment A), adopting the CAAP's Initial Study-Negative Declaration (IS-ND) (Attachment B)

3. Approve the draft Resolution (Attachment C), adopting Pinole's CAAP (Attachment D)

BACKGROUND
After two years of engagement via surveys, public workshops, pop-ups, focus groups, and internal review, the City released a public review draft of its inaugural CAAP on April 19, 2024.

The CAAP is a "greenprint" to bring Pinole to zero carbon emissions by the year 2045, aligning with Senate Bill 32 and Executive Order B-55-18. At the May 7, 2024 City Council meeting, staff presented the public review draft of the CAAP; Council received comments from the public and provided direction for further refinement of the draft Plan. The staff report for the May 7, 2024 CAAP item is provided as Attachment E.

REVIEW AND ANALYSIS
Revisions to the CAAP
Following the May 7 meeting, and due to the extensive length of the public review draft of the CAAP, Staff focused on revamping and streamlining the review process to make it easier for the public to review and comment. Short social media "teasers" focusing on different topics within the CAAP were released to generate interest and engagement. Additionally, to gather diverse feedback, outreach was conducted at Pinole Valley High School and the draft was electronically disseminated to multi-family housing residents through property managers.

Public comments on the draft were accepted until July 31, 2024.

A table showing revisions made to the draft CAAP since the May 7 meeting is provided in Attachment F. Based on specific feedback from Council and the community, the following

Page 157 of 945 ends

revisions were made to the public review draft:
• Action TR-4k was updated to add educational efforts to dispel environmental concerns with EV battery disposal after research found their recyclability to be extremely high1 • Action SW-5 has been assigned to implementation phase 1 • A new action, BE-2o, was added in order to explore a revolving fund for the community in order to simplify and accelerate various decarbonization measures • Action TR-1d was changed from "entity" to "entities" in order to capture a greater opportunity for potential collaboration to expand rebate programs that bolster alternative modes of transportation
• In action BE-3d the word "phase" was updated to "stage" to eliminate confusion with the implementation phases of the plan
• Some actions in the CAAP were completed during the review process and updates were made accordingly to reflect that current progress
• The following actions were moved from implementation phase 2 to phase 1 after reevaluating their degree of urgency:
o Action SW-2j
o Action CAR-1f
o Action CAR-2i
o Action FL-1e
o Action WF-1h
o Action TR-1c
California Environmental Quality Act (CEQA)
Pinole's CAAP further serves as a Qualified Climate Action Plan which can streamline the environmental review process of GHG emissions generated from future development projects.

A draft Initial Study/Negative Declaration (IS-ND) was prepared pursuant to the California Environmental Quality Act (CEQA) and was released on June 17, 2024 for public review and comment. One comment letter was received from East Bay Municipal Water District. All comments on the public review draft and draft IS-ND were considered and incorporated as appropriate. The IS-ND is provided as Exhibit A to Attachment A.

Final CAAP and Implementation
The final CAAP is provided as Exhibit A to Attachment B. Once adopted, the CAAP will also be accompanied by an online dashboard, CAPDash, that will transparently help the City and community monitor progress towards CAAP goals. Additionally, progress reports, GHG inventory updates, and technological advancements will inform updates to the CAAP every 5 years.
1 https://www.prnewswire.com/news-releases/new-survey-americans-are-increasinglyconcerned-about-electric-vehicle-battery-disposal-despite-growth-of-ev-battery-recycling302011678.html

Page 158 of 945 ends

FISCAL IMPACT
CAAP projects and programs will vary in cost. The CAAP places the City in a good position to receive funding for these projects. To begin implementing the CAAP, a myriad of grant funding opportunities are available at the state and federal levels. These grant opportunities are identified in the CAAP. Some actions in the CAAP are a continuation of work the City has already been doing with funding set aside. The CAAP will mainly be driven by Staff, and therefore, Staff hours will be necessary for implementation. The CAAP calls for the create a new full-time staff position in the Community Development Department (such as a Sustainability Manager or Coordinator) to oversee CAAP implementation, monitoring, and reporting in addition to cross-department collaboration. For FY 24-25, Sustainability Project Manager Amin will be assigned this role.

ATTACHMENTS
A. Resolution Adopting the IS-ND for the CAAP
B. Resolution Adopting the CAAP
C. Pinole CAAP Final IS-ND
D. Pinole CAAP Final_08092024 With App
E. May 7 2024 CC Staff Report - CAAP
F. Summary Table of CAAP Updates

Page 159 of 945 ends

RESOLUTION NO. 2024-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PINOLE

ADOPTING AN INITIAL STUDY-NEGATIVE DECLARATION FOR THE CITY OF PINOLE’S CLIMATE ACTION AND ADAPTATION PLAN
WHEREAS, California is particularly vulnerable to the impacts of climate change and increased temperatures threaten to greatly reduce the Sierra snowpack, one of the State's primary sources of water; and
WHEREAS, increased temperatures also threaten to further exacerbate California's air quality problems and adversely impact human health by increasing heat stress and related deaths, the incidence of infectious disease, and the risk of asthma, respiratory and other health problem; and
WHEREAS, in 2005 the California Governor issued Executive Order (EO) S-3-05 establishing statewide targets for reducing greenhouse gas (GHG) emissions to 2000 levels by 2010, 1990 levels by 2020 , and 80% below 1990 levels by 2050 ; and WHEREAS, in 2010, the City of Pinole was the first community in Contra Costa County to adopt a Sustainability Element in its General Plan to define objectives and goals for making the city more sustainable; and
WHEREAS, in 2016 the California Legislature adopted Senate Bill (SB) 32 deepening the State's commitment to GHG emissions reductions by tightening the target to 40% below 1990 levels by 2030; and
WHEREAS, in 2018 the California Governor issued EO B-55-18 expanding upon EO S- 3-05 with a statewide target of reaching carbon neutrality by 2045; and WHEREAS, in 2021 the City of Pinole adopted Resolution No. 2021-93 declaring a Climate Emergency and directing staff to take certain actions; and WHEREAS, over a 20-month period from December 2022 to October 2023, significant community outreach was conducted including surveys, pop-up events, workshops, and group interviews; and
WHEREAS, 26 state, regional, and local agencies, non-profit groups, and other organizations provided input on the draft CAAP and offered support and partnership to achieve its goals; and; and
WHEREAS, the CAAP establishes a GHG emission reduction target pathway

Page 160 of 945 ends

with the following targets: reduce emissions to 21,512 metric tons of carbon dioxide equivalent communitywide by 2030 (which reduces emissions 40% below 1990 levels called for in SB 32) and achieving carbon neutrality by 2045, which aligns with EO B-55- 18); and
WHEREAS, the CAAP contains eight GHG mitigation strategies with 30 measures and 234 actions and five adaptation strategies with eight measures and 69 actions grouped into nine sectors listed below to reduce emissions:

1. Cornerstone

2. Building Energy

3. Transportation

4. Solid Waste

5. Water

6. Carbon Sequestration

7. City Infrastructure and Operations

8. City Governance

9. Climate Adaptation
WHEREAS, the implementation of the CAAP will result in co-benefits including increasing community resilience, improving public health and quality of life, improving habitats and ecosystems, advancing racial and social justice, supporting job creation, and improving mobility and transportation safety; and
WHEREAS, on May 7th, 2024, the City Council was introduced to the CAAP at a public meeting, received feedback from the public and provided direction for next steps; and
WHEREAS, pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15183.5 the City may prepare a qualified GHG Reduction Strategy or Climate Action Plan to evaluate a community's cumulative impact due to GHG emission from future planned development; and
WHEREAS, the CAAP is considered a qualified reduction plan through 2030 and if a project is consistent with the CAAP, the Plan can be used as a basis for determining the project would have less than significant impacts on the community's cumulative GHG emissions under CEQA; and
WHEREAS, pursuant to CEQA, an Initial Study prepared for the CAAP wherein it was determined that there is no substantial evidence that the CAAP will have a significant adverse effect on the environment and a Negative Declaration should be prepared; and
WHEREAS, the Initial Study-Negative Declaration was circulated for public review from June 17, 2024 through July 17, 2024; and

Page 161 of 945 ends

WHEREAS, the City of Pinole received one comment letter on the Negative Declaration from East Bay Municipal Utilities District; and WHEREAS, on August 20, 2024, the City Council held a duly noticed public hearing and considered relevant exhibits, reports, recommendations of City staff, and public testimony set forth herein and set forth prior to making its decision on the CAAP and Negative Declaration.

NOW THEREFORE, BE IT RESOLVED, that the above recitals are true and correct and made part of this resolution.

BE IT FURTHER RESOLVED that the City Council of the City of Pinole does hereby adopt the Negative Declaration attached hereto as Exhibit A to the resolution based on the following findings:

1. The City Council considered the Negative Declaration together with comments received during the public review process prior to acting on the CAAP

2. The City Council finds on the basis of the whole record before it that there is no substantial evidence that the CAAP will have a significant adverse effect on the environment.

3. The Negative Declaration has been completed in compliance with CEQA and with the CEQA Guidelines.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Pinole held on the 20th day of August 2024 by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

I, hereby certify that the foregoing resolution was regularly introduced, passed, and adopted on the 20th day of August 2024
____________________________________
Heather Bell, CMC
City Clerk

Page 162 of 945 ends

RESOLUTION NO. 2024-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PINOLE

ADOPTING THE CLIMATE ACTION AND ADAPTATION PLAN
WHEREAS, California is particularly vulnerable to the impacts of climate change and increased temperatures threaten to greatly reduce the Sierra snowpack, one of the State's primary sources of water; and
WHEREAS, increased temperatures also threaten to further exacerbate California's air quality problems and adversely impact human health by increasing heat stress and related deaths, the incidence of infectious disease, and the risk of asthma, respiratory and other health problem; and
WHEREAS, in 2005 the California Governor issued Executive Order (EO) S3-05 establishing statewide targets for reducing greenhouse gas (GHG) emissions to 2000 levels by 2010, 1990 levels by 2020, and 80% below 1990 levels by 2050; and
WHEREAS, in 2010, the City of Pinole was the first community in Contra Costa County to adopt a Sustainability Element in its General Plan to define objectives and goals for making the city more sustainable; and
WHEREAS, in 2016 the California Legislature adopted Senate Bill (SB) 32 deepening the State's commitment to GHG emissions reductions by tightening the target to 40% below 1990 levels by 2030; and
WHEREAS, in 2018 the California Governor issued EO B-55-18 expanding upon EO S- 3-05 with a statewide target of reaching carbon neutrality by 2045; and WHEREAS, in 2021 the City of Pinole adopted Resolution No. 2021-93 declaring a Climate Emergency and directing staff to take certain actions; and WHEREAS, over a 20-month period from December 2022 to October 2023, significant community outreach was conducted including surveys, pop-up events, workshops, and group interviews; and
WHEREAS, 26 state, regional, and local agencies, non-profit groups, and other organizations provided input on the draft CAAP and offered support and partnership to achieve its goals; and; and
WHEREAS, the CAAP establishes a GHG emission reduction target pathway

Page 163 of 945 ends

with the following targets: reduce emissions to 21,512 metric tons of carbon dioxide equivalent communitywide by 2030 (which reduces emissions 40% below 1990 levels called for in SB 32) and achieving carbon neutrality by 2045, which aligns with EO B55-18); and WHEREAS, the CAAP contains eight GHG mitigation strategies with 30 measures and 234 actions and five adaptation strategies with eight measures and 69 actions grouped into nine sectors listed below to reduce emissions:

1. Cornerstone

2. Building Energy

3. Transportation

4. Solid Waste

5. Water

6. Carbon Sequestration

7. City Infrastructure and Operations

8. City Governance

9. Climate Adaptation
WHEREAS, the implementation of the CAAP will result in co-benefits including increasing community resilience, improving public health and quality of life, improving habitats and ecosystems, advancing racial and social justice, supporting job creation, and improving mobility and transportation safety; and
WHEREAS, pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15183.5 the City may prepare a qualified GHG Reduction Strategy or Climate Action Plan to evaluate a community's cumulative impact due to GHG emission from future planned development; and
WHEREAS, the CAAP is considered a qualified reduction plan through 2030 and if a project is consistent with the CAAP, the Plan can be used as a basis for determining the project would have less than significant impacts on the community's cumulative GHG emissions under CEQA; and
WHEREAS, pursuant to CEQA, an Initial Study-Negative Declaration was prepared for the CAAP; and
WHEREAS, on May 7th, 2024, the City Council was introduced to the CAAP at a public meeting, received feedback from the public and provided direction for next steps; and
WHEREAS, on August 20, 2024, the City Council held a duly noticed public hearing and considered relevant exhibits, reports, recommendations of City staff, and public testimony set forth herein and set forth prior to making its decision on the CAAP and Negative Declaration.

Page 164 of 945 ends

NOW THEREFORE, BE IT RESOLVED, that the above recitals are true and correct and made part of this resolution.

BE IT FURTHER RESOLVED that the City Council of the City of Pinole does hereby approve and adopt the Climate Action and Adaptation Plan attached hereto as Exhibit A to the resolution and authorizes staff to make any nonsubstantive grammatical and formatting edits in the final document.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Pinole held on the 20th day of August 2024 by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

I, hereby certify that the foregoing resolution was regularly introduced, passed, and adopted on the 20th day of August 2024
____________________________________
Heather Bell, CMC
City Clerk

Page 165 of 945 ends

City of Pinole Climate Action and Adaptation
Plan and CEQA GHG Emissions Thresholds
Final Initial Study – Negative Declaration
prepared for
City of Pinole
Community Development Department
2131 Pear Street
Pinole, California 94564
prepared by
Rincon Consultants, Inc.
449 15th Street, Suite 303
Oakland, California 94612
July 31, 2024

Page 166 of 945 ends

Initial Study
Final Initial Study– Negative Declaration i
Table of Contents
Initial Study.............................................................................................................................................1 Proposed Plan Title.........................................................................................................................1 Lead Agency/Plan Sponsor and Contact.........................................................................................1 Plan Location and Physical Setting .................................................................................................1 Existing Sustainability Setting .........................................................................................................4 General Plan Designation and Zoning...........................................................................................14 Description of Plan........................................................................................................................14 Cumulative Projects Scenario .......................................................................................................56 Required Approvals ......................................................................................................................56 Environmental Factors Potentially Affected.........................................................................................58 Determination ......................................................................................................................................58 Environmental Checklist.......................................................................................................................60 1 Aesthetics..........................................................................................................................60 2 Agriculture and Forestry Resources..................................................................................66 3 Air Quality .........................................................................................................................69 4 Biological Resources..........................................................................................................74 5 Cultural Resources............................................................................................................79 6 Energy ...............................................................................................................................81 7 Geology and Soils..............................................................................................................84 8 Greenhouse Gas Emissions...............................................................................................88 9 Hazards and Hazardous Materials ....................................................................................92 10 Hydrology and Water Quality ...........................................................................................97 11 Land Use and Planning....................................................................................................101 12 Mineral Resources ..........................................................................................................103 13 Noise ...............................................................................................................................104 14 Population and Housing..................................................................................................108 15 Public Services.................................................................................................................110 16 Recreation.......................................................................................................................112 17 Transportation ................................................................................................................114 18 Tribal Cultural Resources................................................................................................117 19 Utilities and Service Systems ..........................................................................................120 20 Wildfire............................................................................................................................125 21 Mandatory Findings of Significance................................................................................127 References..........................................................................................................................................129

1. List of Preparers..............................................................................................................132

Page 167 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds ii
Tables
Table 1 Pinole 2017 Communitywide GHG Emissions Levels........................................................16 Table 2 Pinole CAAP GHG Emissions Reduction and Climate Adaptation Strategies, Measures, and Actions...................................................................................................................................17 Table 3 Pinole 2030 GHG Emissions Forecasts (MT of CO2e) ........................................................52 Table 4 Targets Versus GHG Reductions .......................................................................................53 Table 5 Cumulative Projects Scenario ...........................................................................................56 Figures
Figure 1 Regional Location................................................................................................................2 Figure 2 Plan Location.......................................................................................................................3 Figure 3 Pinole Transit Routes..........................................................................................................4 Figure 4 Pinole GHG Emissions Projections and Targets ................................................................52 Figure 5 Determining CEQA GHG Emissions Analysis Methodology ..............................................55 Appendices
Appendix A Sources, Health Effects, and Typical Controls Associated with Criteria Pollutants Appendix B Description of Greenhouse Gases of California Concern

Page 168 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 1
Initial Study
Proposed Plan Title
City of Pinole Climate Action and Adaptation Plan (CAAP) and California Environmental Quality Act (CEQA) Greenhouse Gas (GHG) Emissions Thresholds
Lead Agency/Plan Sponsor and Contact
Lead Agency/Plan Sponsor
City of Pinole
Community Development Department
2131 Pear Street
Pinole, California 94564
Contact Person
Lilly Whalen
Community Development Director
(510) 724-9832
[email protected]
Plan Location and Physical Setting
The Pinole CAAP and CEQA GHG Emissions Thresholds would apply to all areas and plans and projects within the City of Pinole limits. Figure 1 shows the regional location, and Figure 2 shows the plan location.

Page 169 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 2 Figure 1 Regional Location

Page 170 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 3
Figure 2 Plan Location
Regional Location and Setting
The City of Pinole is approximately 12 square miles and located in Contra Costa County, within the east San Francisco Bay area. Pinole is bordered by Richmond and San Pablo to the southwest, Hercules to the northeast, the unincorporated area of El Sobrante to the south, and the San Pablo Bay to the west. The City is connected to the rest of the County and the Bay Area by State Route 4 (SR 4) and Interstates 80 (I 80), which traverse the City. These freeways provide regional access to Pinole, which is also served by public transit facilities, including the Western Contra Costa Transit Authority (WestCAT) bus lines. Transit routes in Pinole are shown in Figure 3. In addition, nearby airports include the Buchanan Field Airport, which is located over 12 miles to the east.

Local Setting
Pinole had a population of 18,244 in 2023 according to the California Department of Finance (DOF).1 According to the General Plan,2 the City’s existing land use pattern is generally a mix of residential neighborhoods and commercial and business centers combined with parks and open spaces.

Although the City of Pinole is largely built out, it includes opportunities for infill mixed-use 1 California Department of Finance (DOF). 2023. E-5 Population and Housing Estimates. https://dof.ca.gov/forecasting/demographics/estimates/e-5-population-and-housing-estimates-for-cities-counties-and-the-state-2020- 2023/ (accessed January 2024).
2 Pinole, City of. 2010. General Plan Update. October 20, 2010. https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_10946972/File/City%20Government/Planning/General%20Plan/2010%20General%20Plan %20with%202023-2031%20Housing%20Element%20Update.pdf (accessed January 2024).

Page 171 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 4 development in a strategically located area near the Berkeley/Oakland and San Francisco employment centers. The City also has several distinct areas that characterize the City and surrounding area, including the Historic Old Town area north of I 80 that contains historic residences built for individuals who worked in Pinole or at the Hercules Powder Plant during the City’s formative years as well as a commercial and business core that contains important civic and recreational facilities; Pinole Vista and Pinole Ridge Shopping Center, a regionally serving shopping district along Fitzgerald Avenue between the Richmond Parkway and Appian Way exits of Interstate 80; and Pinole Valley, an area that includes community serving retail, Pinole Valley High School, and residential areas with access provided primarily by Pinole Valley Road.3 Figure 3 Pinole Transit Routes
Existing Sustainability Setting
Pinole Sustainability and Greenhouse Gas Emissions Reduction Efforts The City has actively implemented a variety of environmental programs contributing to GHG emissions reductions. The following is a list of Pinole’s primary sustainability and climate protection programs and policies:
▪ Pinole Creek Watershed Vision Plan (2004)
3 Pinole, City of. 2010. General Plan, Introduction. https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_10946972/File/City%20Government/Planning/General%20Plan/City_of_Pinole_General_Pl an_12.2010-Chapter1.pdf (accessed January 2024)

Page 172 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 5
▪ General Plan – Sustainability Element (2010)
▪ Three Corridors Specific Plan (2010)
▪ Pinole Green Infrastructure Plan (2019)
▪ Climate Resolution (2021)
▪ Pinole Economic Development Strategy (2022)
▪ Updated Community Inventory and Prepared Municipal Inventory, as well as community forecast and targets (2022)
▪ Capital Improvement Plan (2024)
The City has also taken several additional sustainability actions, such as initiating a municipal energy audit that will evaluate all City facilities and identify solutions for upgrades, retrofits, and replacements of existing energy systems to enhance efficiency, reduce environmental impact, and optimize resource utilization, aligning with the City's commitment to fostering sustainable practices and minimizing its carbon footprint. A Local Road Safety Plan is also being prepared to identify and improve corridors to make it safer and more convenient to actively commute. Pinole is also working towards banning single-use plastics for packaging consumer goods and takeout food (e.g., plastic bags and plastic foodware such as plates, cups, accessories, and cutlery) and expanding its Procurement Policy to capture more green goods and services. Additionally, The City is preparing a Draft Parks Master Plan which will include development of sustainable recreation and park development.

Regional Sustainability and GHG Reduction Efforts
In coordination with Contra Costa County, the State of California, and the federal government, the City of Pinole has committed to implementing regional and State policies related to GHG emissions reductions. As follows is a summary of the existing regional GHG emissions reduction efforts, which the Pinole CAAP is intended to be consistent with or exceed.

Plan Bay Area: Strategy for a Sustainable Region
In October 2021, the Association of Bay Area Governments (ABAG) and Metropolitan Transportation Commission (MTC) jointly adopted Plan Bay Area 2050, which serves as the Bay Area regional longrange plan and identifies how the Bay Area would meet its GHG emission reduction goals. Plan Bay Area is also considered the ABAG/MTC Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS). In accordance with Senate Bill (SB) 743, Plan Bay Area includes elements designed to encourage the type of land-use development to preserve affordable housing, improve economic mobility, enhance the transit network to reduce vehicle miles traveled (VMT) per capita, and reduce hazard risks including through adaptation to sea level rise and reducing GHG emissions.4 Bay Area Air Quality Management District CEQA Guidelines In 2022, the Bay Area Air Quality Management District (BAAQMD) adopted the CEQA Thresholds for Evaluating the Significance of Climate Impacts from Land Use Projects and Plans and is in the process of updating their 2017 CEQA Guidelines.5 The CEQA Thresholds for Evaluating the 4 ABAG-MTC. 2021. Plan Bay Area 2050. https://www.planbayarea.org/finalplan2050 (accessed November 2023). 5 BAAQMD. 2022. CEQA Thresholds for Evaluating the Significance of Climate Impacts from Land Use Projects and Plans. https://www.baaqmd.gov/~/media/files/planning-and-research/ceqa/ceqa-guidelines-2022/appendix-b-thresholds-for-evaluatingsignificance-of-climate-impacts_final-pdf.pdf?la=en (accessed November 2023).

Page 173 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 6 Significance of Climate Impacts from Land Use Projects and Plans include requirements for projects and plans in jurisdictions that do not have an adopted local GHG reduction strategy that meets the criteria of CEQA Guidelines Section 15183(b). In addition, according to the BAAQMD, if a project is consistent with a local GHG reduction strategy, then it can be presumed that the project will not have significant GHG impacts.6 This approach is consistent with CEQA Guidelines, Section 15183.5:

Lead agencies may analyze and mitigate the significant impacts of GHG emissions at a programmatic level, such as…a plan to reduce GHG emissions. Later project-specific environmental documents may tier from and/or incorporate by reference that existing programmatic review. Project-specific environmental documents may rely on an [Environmental Impact Report] containing a programmatic analysis of GHG emissions.

Contra Costa Countywide Comprehensive Transportation Plan In 2017, the Contra Costa Transportation Authority adopted the Countywide Transportation Plan (CTP), which serves as the blueprint for Contra Costa’s transportation system through 2040. Five key goals have been adopted by the Contra Costa Transportation Authority for the 2017 CTP, which include: supporting the efficient, safe, and reliable movement of people and goods using all available travel modes; managing growth to sustain Contra Costa’s economy, preserving its environment and supporting its communities; expanding safe, convenient, and affordable alternatives to the single-occupant vehicle; maintaining the transportation system; and continuing to invest wisely to maximize the benefits of available funding.7 In support of the Countywide CTP, the Contra Costa Transportation Authority has also prepared separate draft action plans for each subregion in Contra Costa County. Pinole is in the West County subregion,8 which encompasses the incorporated jurisdictions of El Cerrito, Richmond, San Pablo, Pinole, and Hercules, as well as unincorporated portions of western Contra Costa County. This update of the West County Action Plan has been prepared concurrently with, and in conjunction with, updates to the other four subregional action plans which will be used to determine the policies and actions that the Authority can adopt in the 2024 CTP Update which is currently being drafted and is intended to serve as the 25- year blueprint for improving transportation, reducing congestion, improving mobility, supporting a robust economy, and improving quality of life throughout Contra Costa. It is anticipated that the Draft CTP will be published in late 2024 and the Final CTP will go to the Authority Board for adoption in Spring 2025.9
Contra Costa County Climate Action Plan
In 2008, the County adopted its first Municipal Climate Action Plan10 identifying strategies to make government operations more sustainable. The Municipal Climate Action Plan identified thirteen existing and planned GHG reduction measures including employee carpool and vanpool programs; direct digital control for heating, ventilation, and air conditioning systems in County buildings; and 6 Ibid
7 Contra Costa Transportation Authority. 2017 Countywide Comprehensive Transportation Plan, Volume 1. September 10, 2017. https://ccta.net/wp-content/uploads/2021/07/2017-CTP-Vol-1.2017.10.05.pdf (accessed January 2024) 8 Contra Costa Transportation Authority. West County Action Plan. March 2023. https://ccta.net/wp-content/uploads/2023/03/DraftWest-County-Action-Plan_03-13-23.pdf (accessed January 2024) 9 Contra Costa Transportation Authority. Countywide Transportation Plan and Action Plans. 2024. https://ccta.net/planning/countywidetransportation-plan/ (accessed January 2024) 10 Contra Costa County, California. Municipal Climate Action Plan. December 2008. https://www.contracosta.ca.gov/DocumentCenter/View/2905/Municipal-Climate-Action-Plan-1208-Attachment-A?bidId= (accessed January 2024)

Page 174 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 7
flexible employee work schedules. The CAP was updated in 201511 to reflect legislation at that time and is currently being updated in parallel with the County’s General Plan.12 Marin Clean Energy
Marin Clean Energy (MCE) formed in 2010 as California’s first community choice energy program and currently provides electricity to more than 1.5 million residents and businesses in 37 member communities across Contra Costa, Marin, Napa, and Solano Counties. As demonstrated in MCE’s 2019 Integrated Resource Plan,13 MCE’s base energy product (Light Green) was 60 percent renewable starting in 2019 and is expected to rise to 70 percent by 2030. This would put MCE 11 years ahead of schedule in meeting Senate Bill 100’s 2030 RPS targets. Additionally, MCE’s GHG-free content was 100 percent in 2022, 23 years earlier than the State mandate.

State Sustainability and GHG Reduction Efforts
As follows is a summary of existing State GHG emissions reduction efforts, which the CAAP is intended to be consistent with or exceed.

GHG Reduction Policies
CALIFORNIA EXECUTIVE ORDER S-3-05
In 2005, the California governor issued Executive Order (EO) S-3-05, which identifies statewide GHG emissions reduction goals to achieve long-term climate stabilization as follows:
▪ Reduce GHG emissions to 1990 levels by 2020
▪ Reduce GHG emissions to 80 percent below 1990 levels by 2050 In response to EO S-3-05, California Environmental Protection Agency (CalEPA) created the Climate Action Team (CAT), which in March 2006 published the Climate Action Team Report (the “2006 CAT Report”). The 2006 CAT Report identified a recommended list of strategies that the State could pursue to reduce GHG emissions. These are strategies that could be implemented by various State agencies to meet the emission reduction targets in EO S-3-05 with existing authority of the State agencies. The strategies include the reduction of passenger and light duty truck emissions, the reduction of idling times for diesel trucks, an overhaul of shipping technology/infrastructure, increased use of alternative fuels, increased recycling, and landfill methane capture, among others.

CALIFORNIA ASSEMBLY BILL 32, CALIFORNIA GLOBAL WARMING POLLUTION SOLUTIONS ACT In 2006, the California legislature signed Assembly Bill (AB) 32 – the Global Warming Solutions Act – into law, requiring a reduction in Statewide GHG emissions to 1990 levels by 2020 and California Air Resources Board (CARB) preparation of a Scoping Plan that outlines the main State strategies for reducing GHGs to meet the 2020 deadline. In addition, AB 32 required CARB to adopt regulations to 11 Contra Costa County. Conta Costa County Climate Action Plan. December 15, 2015. https://www.contracosta.ca.gov/DocumentCenter/View/39791/Contra-Costa-County-Climate-Action-Plan?bidId= (accessed January 2024)
12 Contra Costa County. Envision Contra Costa 2040. https://envisioncontracosta2040.org/overview/#cap (accessed January 2024) 13 Marin Clean Energy (MCE). 2018. 2019 Integrated Resource Plan. https://www.mcecleanenergy.org/wpcontent/uploads/2020/01/MCE-Integrated-Resource-Plan_2019.pdf (accessed January 2024)

Page 175 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 8 require reporting and verification of Statewide GHG emissions. Based on this guidance, CARB approved a 1990 Statewide GHG level and 2020 limit of 427 MT of CO2e.

CALIFORNIA SENATE BILL 375, SUSTAINABLE COMMUNITIES AND CLIMATE PROTECTION ACT In 2008, Senate Bill (SB) 375 enhanced the State’s ability to reach AB 32 targets by developing regional GHG emissions reduction goals to be achieved from passenger vehicles for 2020 and 2035.

In addition, SB 375 directs each of the State’s 18 major Metropolitan Planning Organizations (MPO) to prepare a sustainable community’s strategy (SCS) that contains a growth strategy to meet such regional GHG emissions reduction targets for inclusion in the respective regional transportation plan (RTP).

On March 22, 2018, CARB adopted updated regional targets for reducing GHG emissions from 2005 levels by 2020 and 2035. The Association of Bay Area Governments was assigned targets of a ten percent reduction in per capita GHG emissions from passenger vehicles by 2020 and a nineteen percent reduction in per capita GHG emissions from passenger vehicles by 2035.14

CALIFORNIA CLIMATE CHANGE SCOPING PLAN
In 2008, CARB approved the original California Climate Change Scoping Plan, which included measures to address GHG emission reduction strategies related to energy efficiency, water use, and recycling and solid waste, among other measures. Many of the GHG reduction measures included in the Scoping Plan (e.g., Low Carbon Fuel Standard, Advanced Clean Car standards, and Cap-andTrade) have been adopted and implemented since approval of the Scoping Plan.

CALIFORNIA CLIMATE CHANGE SCOPING PLAN UPDATE (2013)
In 2013, CARB approved the first update to the California Climate Change Scoping Plan. The 2013 Scoping Plan Update defined CARB climate change priorities for the next five years and set the groundwork to reach post-2020 Statewide GHG emissions reduction goals. The 2013 Scoping Plan Update highlighted California’s progress toward meeting the “near-term” 2020 GHG emission reduction goals defined in the original Scoping Plan. It also evaluated how to align the State’s longer-term GHG reduction strategies with other State policy priorities, including those for water, waste, natural resources, clean energy, transportation, and land use.

CALIFORNIA EXECUTIVE ORDER B-30-15
In 2015, the California governor issued Executive Order B-30-15, which established a statewide midterm GHG reduction target of 40 percent below 1990 levels by 2030. The EO also calls for another update to the CARB Scoping Plan.

CALIFORNIA SENATE BILL 32, CALIFORNIA GLOBAL WARMING POLLUTION SOLUTIONS ACT UPDATE In 2016, SB 32 was passed, extending AB 32 by requiring further reduction in statewide GHG emissions to 40 percent below 1990 levels by 2030 (the other provisions of AB 32 remain unchanged). On December 14, 2017, CARB adopted the 2017 Scoping Plan, which provides a framework for achieving the 2030 target. The 2017 Scoping Plan relies on the continuation and expansion of existing policies and regulations, such as the Cap-and-Trade Program, as well as implementation of recently adopted policies and policies, such as SB 350 and SB 1383 (see below). 14 CARB. 2023. SB 375 Regional Plan Climate Targets. Available: https://ww2.arb.ca.gov/our-work/programs/sustainable-communitiesprogram/regional-plan-targets (accessed November 2023).

Page 176 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 9
2016 Senate Bill 1383
Adopted in September 2016, SB 1383 requires CARB to approve and begin implementing a comprehensive strategy to reduce emissions of short-lived climate pollutants. The bill requires the strategy to achieve the following reduction targets by 2030:
▪ Methane – 40 percent below 2013 levels
▪ Hydrofluorocarbons – 40 percent below 2013 levels
▪ Anthropogenic black carbon – 50 percent below 2013 levels SB 1383 also requires CalRecycle, in consultation with CARB, to adopt regulations that achieve specified targets for reducing organic waste in landfills. The bill further requires 20 percent of edible food disposed of at the time to be recovered by 2025.

CALIFORNIA CLIMATE CHANGE SCOPING PLAN UPDATE (2017)
On December 14, 2017, CARB adopted the 2017 Scoping Plan, which provides a framework for achieving the 2030 goal set by SB 32. The 2017 Scoping Plan relies on the continuation and expansion of existing policies and regulations, such as the Cap-and-Trade Program, as well as implementation of recently adopted policies, such as SB 350 and SB 1383.

The 2017 Scoping Plan also puts an increased emphasis on innovation, adoption of existing technology, and strategic investment to support its strategies. As with the 2014 Scoping Plan Update, the 2017 Scoping Plan does not provide project-level thresholds for land use development.

Instead, it recommends that local governments adopt policies and locally appropriate quantitative thresholds consistent with statewide per capita goals of six metric tons (MT) CO2e by 2030 and two MT CO2e by 2050. As stated in the 2017 Scoping Plan, these goals may be appropriate for plan-level analyses (city, county, subregional, or regional level), but not for specific individual projects because they include all emissions sectors in the State.
15 CALIFORNIA EXECUTIVE ORDER B-55-18
In 2018, the California governor issued Executive Order B-55-18, which established a new Statewide goal of achieving carbon neutrality by 2045 and maintaining net negative emissions thereafter. This goal is in addition to the existing Statewide GHG reduction targets established by SB 32.

ASSEMBLY BILL 1279
In September 2022, AB 1279 was approved, which established a legally binding requirement for California to achieve and maintain carbon neutrality no later than 2045. Assembly Bill 1279 also established the requirement to achieve a Statewide reduction in GHG emissions of 85 percent below 1990 levels by 2045. This indicates that the remaining 15 percent to achieve carbon neutrality can be achieved via carbon sequestration and other non-direct-GHG-emissions-reductions techniques.

CALIFORNIA CLIMATE CHANGE SCOPING PLAN UPDATE (2022)
In response to the passage of AB 1279 and the identification of the 2045 GHG reduction target, CARB adopted the Final 2022 Climate Change Scoping Plan in November 2022. The 2022 Update builds upon the framework established by the 2008 Climate Change Scoping Plan and previous 15 CARB. 2017. California 2017 Climate Change Scoping Plan. https://ww2.arb.ca.gov/sites/default/files/classic//cc/scopingplan/scoping_plan_2017.pdf (accessed November 2023).

Page 177 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 10 updates while identifying a new, technologically feasible, cost-effective, and equity-focused path to achieve California’s climate target. The 2022 Update includes policies to achieve a significant reduction in fossil fuel combustion, further reductions in short-lived climate pollutants, support for sustainable development, increased action in natural working lands to reduce emissions and sequester carbon, and the capture and storage of carbon. The 2022 Update assesses the progress California is making toward reducing its GHG emissions by at least 40 percent below 1990 levels by 2030, as called for in SB 32 and laid out in the 2017 Scoping Plan, addresses recent legislation and direction from the governor, extends and expands upon these earlier plans, and implements a target of reducing anthropogenic emissions to 85 percent below 1990 levels by 2045, as well as taking an additional step of adding carbon neutrality as a science-based guide for California’s climate work.16
For more information on the Senate and Assembly Bills, Executive Orders, and Scoping Plans discussed above, and to view reports and research referenced above, please refer to the following websites: www.climatechange.ca.gov and www.arb.ca.gov/cc/cc.htm.

Energy- and Vehicle-Related Policies
ASSEMBLY BILL 1493, PAVLEY BILL VEHICLE EFFICIENCY STANDARDS In 2002, the California State Legislature enacted Assembly Bill 1493 (aka “the Pavley Bill”), which directs the CARB to adopt standards that will achieve "the maximum feasible and cost-effective reduction of GHG emissions from motor vehicles," taking into account environmental, social, technological, and economic factors. In September 2009, CARB adopted amendments to the “Pavley” regulations to reduce GHG emissions in new passenger vehicles from 2009 through 2016.

The Pavley Bill is considered to be the national model for vehicle emissions standards. In January of 2012, CARB approved a new emissions control program for vehicle model years 2017 through 2025.

The program combines the control of smog, soot, and GHGs and the requirement for greater numbers of zero emission vehicles into a single package of standards called Advanced Clean Cars.

CALIFORNIA ENERGY EFFICIENCY STRATEGIC PLAN OF 2008
In 2008, the California Public Utilities Commission (CPUC) adopted California’s first Long Term Energy Efficiency Strategic Plan, presenting a single roadmap to achieve maximum energy savings across all major groups and sectors in California. The Strategic Plan was subsequently updated in January 2011 to include a lighting chapter. The Strategic Plan sets goals of all new residential construction and all new commercial construction in California to be zero net energy (ZNE) by 2020 and 2030, respectively. In 2018, the California Energy Commission voted to adopt a policy requiring all new homes in California to incorporate rooftop solar. This change went into effect in January 2020 with the adoption of the 2019 California Code of Regulations (CCR) Title 24 Code and is a step towards the State achieving its goal of all residential new construction being zero-net energy (ZNE) by 2020. Additionally, the Strategic Plan sets goals of 50 percent of existing commercial buildings to be retrofitted to ZNE by 2030, and all new State buildings and major renovations to be constructed to ZNE by 2025.
16 CARB. 2022. 2022 Scoping Plan for Achieving Carbon Neutrality. https://ww2.arb.ca.gov/sites/default/files/2022-12/2022-sp.pdf (accessed November 2023)

Page 178 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 11
CALIFORNIA CODE OF REGULATIONS TITLE 24 (CALIFORNIA BUILDING CODE) Updated every three years through a rigorous stakeholder process, Title 24 of the CCR requires California homes and businesses to meet strong energy efficiency measures, thereby lowering their energy use. Title 24 contains numerous subparts, including Part 1 (Administrative Code), Part 2 (Building Code), Part 3 (Electrical Code), Part 4 (Mechanical Code), Part 5 (Plumbing Code), Part 6 (Energy Code), Part 8 (Historical Building Code), Part 9 (Fire Code), Part 10 (Existing Building Code), Part 11 (Green Building Standards Code), Part 12 (Referenced Standards Code). The California Building Code is applicable to all development in California. (Health and Safety Code § 17950 and 18938(b).)
The regulations receive input from members of industry, as well as the public, with the goal of "[r]educing of wasteful, uneconomic, inefficient, or unnecessary consumption of energy." (Pub. Res.

Code § 25402.) These regulations are carefully scrutinized and analyzed for technological and economic feasibility (Pub. Res. Code § 25402(d)) and cost effectiveness (Pub. Res. Code § 25402(b)(2) and (b)(3)). The 2022 Title 24 standards went into effect on January 1, 2023.

Part 6 – Building Energy Efficiency Standards
CCR Title 24 Part 6 is the Building Energy Efficiency Standards. This code, originally enacted in 1978, establishes energy-efficiency standards for residential and non-residential buildings in order to reduce California’s energy demand. The Building Energy Efficiency Standards is updated periodically to incorporate and consider new energy-efficiency technologies and methodologies as they become available. New construction and major renovations must demonstrate their compliance with the current Building Energy Efficiency Standards through submission and approval of a Title 24 Compliance Report to the local building permit review authority and the California Energy Commission.

Part 11 – California Green Building Standards
The California Green Building Standards Code, referred to as CALGreen, was added to Title 24 as Part 11, first in 2009 as a voluntary code, which then became mandatory effective on January 1, 2011 (as part of the 2010 California Building Standards Code). The 2022 CALGreen includes mandatory minimum environmental performance standards for all ground-up new construction of residential and non-residential structures. It also includes voluntary tiers with stricter environmental performance standards for these same categories of residential and non-residential buildings. Local jurisdictions must enforce the minimum mandatory CALGreen standards and may adopt additional amendments for stricter requirements.

The mandatory standards applicable to air quality require:
▪ Minimum 20 percent reduction in indoor water use relative to specified baseline levels;17 ▪ Waste Reduction:
 Minimum 65 percent non-hazardous construction/demolition waste diverted from landfills;  Non-residential and multi-family dwellings with five or more units: Provide readily accessible areas identified for the depositing, storage and collection of nonhazardous 17 Similar to the compliance reporting procedure for demonstrating Energy Code compliance in new buildings and major renovations, compliance with the CALGreen water reduction requirements must be demonstrated through completion of water use reporting forms.

Buildings must demonstrate a 20 percent reduction in indoor water use by either showing a 20 percent reduction in the overall baseline water use as identified in CALGreen or a reduced per-plumbing-fixture water use rate.

Page 179 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 12 materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastic, organic waste, and metals; and/or
 Non-residential: Reuse and/or recycling of 100 percent of trees, stumps, rocks, and associated vegetation soils resulting from primary land clearing; ▪ Inspections of energy systems to ensure optimal working efficiency; ▪ Low-pollutant emitting exterior and interior finish materials such as paints, carpets, vinyl flooring, and particleboards; and
▪ EV Charging for New Construction:18
 One- and two-family dwellings and town houses with attached private garages: Dedicated circuitry to facilitate installation of electric vehicle (EV) charging;  Multi-family dwellings and hotels/motels with less than 20 units/rooms: Designation of at least 10 percent of the total number of parking spaces shall be EV capable and at least 25 percent of the total number of parking spaces shall be EV-ready;  Multi-family dwellings and hotels/motels with greater than 20 units/rooms: Designation of at least 10 percent of the total number of parking spaces shall be EV capable, at least 25 percent of the total number of parking spaces shall be EV-ready, and at least 5 percent of the total number of parking spaces shall be equipped with a Level 2 charging station;  Non-residential land uses shall comply with the following EV charging requirements based on the number of passenger vehicle parking spaces:
0-9: no EV capable spaces or charging stations required; 10-25: 4 EV capable spaces but no charging stations required; 26-50: 8 EV capable spaces of which 2 must be equipped with charging stations; 51-75: 13 EV capable spaces of which 3 must be equipped with charging stations; 76-100: 17 EV capable spaces of which 4 must be equipped with charging stations; 101-150: 25 EV capable spaces of which 6 must be equipped with charging stations; 151-200: 35 EV capable spaces of which 9 must be equipped with charging stations; and More than 200: 20 percent of the total available parking spaces of which 25 percent must be equipped with charging stations;
□ Non-residential land uses shall comply with the following EV charging requirements for medium- and heavy-duty vehicles: warehouses, grocery stores, and retail stores with planned off-street loading spaces shall install EV supply and distribution equipment, spare raceway(s) or busway(s) and adequate capacity for transformer(s), service panel(s), or subpanel(s) at the time of construction based on the number of off-street loading spaces as indicated in Table 5.106.5.4.1 of the California Green Building Standards; ▪ Bicycle Parking:
 Non-residential short-term bicycle parking for projects anticipated to generate visitor traffic:
permanently anchored bicycle racks within 200 feet of visitor entrance for 5 percent of new visitor motorized vehicle parking spaces with a minimum of one 2-bike capacity rack; and/or 18 EV Capable = a vehicle space with electrical panel space and load capacity to support a branch circuit and necessary raceways to support EV charging; EV-ready = a vehicle space which is provided with a branch circuit and any necessary raceways to accommodate EV charging stations, including a receptacle for future installation of a charger (see 2022 California Green Building Standard Code, Title 24 Part 11 for full explanation of mandatory measures, including exceptions).

Page 180 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 13
 Non-residential buildings with tenant spaces of 10 or more employees/tenant-occupants:
secure bicycle parking for 5 percent of the employee/tenant-occupant vehicle parking spaces with a minimum of one bicycle parking facility.
▪ Shade Trees (Non-Residential):
 Surface parking: minimum No. 10 container size or equal shall be installed to provide shade over 50 percent of the parking within 15 years (unless parking area covered by appropriate shade structures and/or solar);
 Landscape areas: minimum No. 10 container size or equal shall be installed to provide shade of 20 percent of the landscape area within 15 years; and/or  Hardscape areas: minimum No. 10 container size or equal shall be installed to provide shade of 20 percent of the landscape area within 15 years (unless covered by applicable shade structures and/or solar or the marked area is for organized sports activities).

ASSEMBLY BILL 117, COMMUNITY CHOICE AGGREGATION
AB 117 allows the creation of Community Choice Aggregation (CCA) that fosters clean and renewable energy markets. CCA allows cities and counties to aggregate the buying power of individual jurisdictions. The California CCA markets were created as an answer to the brownouts and energy shortages of the early 2000’s. AB 117 was passed in 2002 as an answer to California’s increased energy independency by incorporating more alternative and renewable energy sources into its energy portfolio. With AB 117, municipalities can provide alternative energy choices to their local carrier (e.g., Pacific Gas and Electric). MCE was the first CCA in the State of California to go online with a 50 percent to 100 percent clean energy portfolio in 2010. In 2017, SVCE began supplying south bay area communities, including Pinole, with options for 100 percent renewable energy-sourced electricity or electricity from a mix of renewable and non-renewable sources. CCAs are governed by the CPUC. SB 790 further ensures fair and transparent competition by creating a code of conduct and guiding principles for entrants into the CCA field.

SENATE BILL 1275, CHARGE AHEAD INITIATIVE
In 2014, SB 1275 established a State goal of one million zero-emissions and near-zero-emissions vehicles in service by 2020 and directed CARB to develop a long-term funding plan to meet this goal.

SB 1275 also established the Charge Ahead California Initiative requiring planning and reporting on vehicle incentive programs and increasing access to and benefits from zero-emissions vehicles for disadvantaged, low- and moderate-income communities and consumers.

SENATE BILL 350, CLEAN ENERGY AND POLLUTION REDUCTION ACT OF 2015 In 2015, SB 350 established new clean energy, clean air, and GHG reduction goals for 2030 and beyond. SB 350 codified Governor Brown’s aggressive clean energy goals and established the State 2030 GHG reduction target of 40 percent below 1990 levels. To achieve this goal, SB 350 increases California’s renewable electricity procurement goal from 33 percent by 2020 (legislation originally enacted in 2002) to 50 percent by 2030. Renewable resources include wind, solar, geothermal, wave, and small hydroelectric power. In addition, SB 350 requires the State to double statewide energy efficiency savings in electricity and natural gas end uses by 2030 from a base year of 2015.

Page 181 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 14 SENATE BILL 1020, CLEAN ENERGY, JOBS, AND AFFORDABILITY ACT OF 2022 Established in 2002 under SB 1078, and accelerated by SB 107 (2006), SB X 1-2 (2011), SB 100 (2018), and SB 1020, California’s Renewable Portfolio Standard (RPS) obligates investor-owned utilities, energy service providers, and community choice aggregators to transition the electricity supply to renewable resources. The RPS requires energy service providers to supply renewable energy as follows: 90 percent of retail sale electricity and 100 percent of electricity procured to serve state agencies by 2035, 95 percent by 2040, and 100 percent by 2045. The CPUC and the CEC are jointly responsible for implementing the program.

Other GHG Emissions-Related Policies
ASSEMBLY BILL 197, STATE AIR RESOURCES BOARD GHGS REGULATIONS In 2016, the California legislature approved AB 197, a bill linked to SB 32, which increases legislature oversight over CARB and directs CARB to prioritize disadvantaged communities in its climate change regulations, and to evaluate the cost-effectiveness of measures it considers. AB 197 requires CARB to protect the State’s most impacted and disadvantaged communities [and] consider the social costs of the emissions of GHGs when developing climate change programs. The bill also adds two new legislatively appointed non-voting members to CARB, increasing the Legislature’s role in CARB’s decisions.

SENATE BILL 97, CEQA GUIDELINES FOR ADDRESSING GHG EMISSIONS CEQA requires public agencies to review the environmental impacts of proposed projects, including General Plans, Specific Plans, and specific kinds of development projects. In February 2010, the California Office of Administrative Law approved the recommended amendments to the State CEQA Guidelines for addressing GHG emissions. The amendments were developed to provide guidance to public agencies regarding the analysis, mitigation, and effects of GHG emissions in draft CEQA documents.

General Plan Designation and Zoning
The Pinole CAAP and CEQA GHG Emissions Thresholds would be implemented throughout the City and would occur in all General Plan designations and in all zoning designations.

Description of Plan
Pinole CAAP
The City of Pinole CAAP was developed to achieve a resilient and climate-ready community and support regional, State, and global climate goals through achieving the City’s 2030 and 2045 climate action targets. The City’s GHG targets were developed relative to the 2017 Community GHG emissions by back-casting to 1990. This back-cast utilized the change in statewide GHG emissions between 2017 and 1990 as a proxy for change in Pinole during the same period.19 The estimated 1990 GHG emissions were then reduced by 40 percent to establish a 2030 target for the City and 19 The City of Pinole’s 1990 GHG emissions were estimated to be 78,982 MT CO2e based on a nine percent increase in state GHG emissions seen between 2017 and 1990.

Page 182 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 15
reduced to zero to establish a 2045 target for the City. The targets, established as follows, remain consistent with the State’s 2030 and 2045 goals:
▪ Reduce GHG emissions to 47,389 MT CO2e by 2030 (the SB 32 target year) ▪ Reduce GHG emissions to 0 MT CO2e by 2045 (the AB 1249 target year) The CAAP provides a foundation for future sustainable development efforts in Pinole, and it is anticipated that environmental review documents for future development projects would identify and incorporate applicable GHG reduction measures and actions from the CAAP. The CAAP addresses communitywide GHG emissions and includes a discrete target for Pinole to reach maximum emissions of 47,389 CO2e by 2030. The CAAP includes a summary of the emissions inventory and forecast, measures and actions to achieve the City’s climate mitigation and resilience goals and focuses on actions through 2030 for purposes of meeting the City’s 2030 GHG emission target.

The 2017 GHG emissions inventory provides the basis for emissions forecasts for the years 2025, 2030, 2035, 2040, and 2045. The GHG emissions inventory was completed in compliance with all relevant protocols and guidance documents, including U.S. Community Protocol, Local Government Operations Protocol, the Global Protocol for Community Scale GHG Emissions, and the Intergovernmental Panel on Climate Change (IPCC) Guidelines for National GHG Inventories. In 2017, Pinole’s total GHG emissions were estimated to be 73,513 MT of CO2e. GHG emissions in the inventory are categorized based on sectors. These sectors include off-road vehicles and equipment, solid waste, water and wastewater, on-road transportation, residential energy use, and nonresidential energy use. Table 1 provides the summary of Pinole’s 2017 GHG emissions by sector, as well as each sector’s percentage of communitywide emissions.20 As shown therein, the largest GHG emissions are related to transportation and building energy use. 20 Rincon Consultants, Inc. City of Pinole 2017 Community Inventory. Updated January 2024.

Page 183 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 16 Table 1 Pinole 2017 Communitywide GHG Emissions Levels GHG Emissions Sector/Source CO2e (MT) Percent of Total Emissions Residential Energy 21,878 30
Electricity 3,738 5
Natural Gas 18,140 25
Nonresidential Energy 11,210 16
Electricity 5,918 8
Natural Gas 5,291 7
On-road Transportation 30,483 42
Off-Road Equipment 5,236 7
Water and Wastewater 166 <1
Solid Waste 3,300 5
Total 72,273 100
CO2e = carbon dioxide equivalent; MT = Metric Tons
Source: Rincon Consultants, Inc. City of Pinole 2017 Community Inventory. Updated January 2024.

Note: Values may not add up due to rounding.

The Pinole CAAP establishes a target to reduce communitywide GHG emissions to 40 percent below 1990 levels by 2030 (47,389 MT of CO2e), which aligns with the SB 32 State GHG emissions target, consistent with CEQA for a qualified GHG emissions reduction strategy and to be achievable by Citysupported measures and actions identified in the Pinole CAAP. The CAAP includes a business-asusual (BAU) forecast and an adjusted BAU (ABAU) forecast of GHG emissions, based on the 2017 inventory, which enables Pinole to estimate the emissions reductions required to meet its communitywide reduction targets.

The Pinole CAAP is organized into 13 strategies for GHG emissions reduction and climate adaptation, each of which includes measures and actions. These strategies focus on clean electricity, building decarbonization, transportation decarbonization and sustainable land use planning, solid waste and water use reductions, community engagement, and climate adaptation. Table 2 includes a complete list of the strategies, measures, and actions established by the City for inclusion in the CAAP, as well as anticipated annual GHG reductions attributable to mitigation-related measures in 2030.

Measures that focus on adaptation will note “Not Applicable” or “N/A” in the emissions reduction quantification column below.

Page 184 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 17
Table 2 Pinole CAAP GHG Emissions Reduction and Climate Adaptation Strategies, Measures, and Actions
Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
Strategy CR: Cornerstone to Climate Action and Adaptation Planning Measure CR-1. Leverage the CAAP’s work around electrification, transportation infrastructure buildout, organic waste diversion, and carbon sequestration to establish Pinole as a center for green economic development and high-road jobs.

CR-1a Coordinate with the City’s Economic Development staff to review and update the Pinole Economic Development Strategy every three years (2026/28, 2029/31, 2032/34, etc.) and adjust fees to specifically attract green and clean energy businesses to Pinole by reflecting changing economic trends, evolving community needs, and emerging opportunities. Include an annual review of the fee schedules (including a survey of competitor’s fees) to assess their impact on green businesses.
2030: N/A
2045: N/A
CR-1b Work with the City’s Economic Development staff to perform direct outreach to existing Pinole businesses to identify climate change impacts (e.g., climate hazards, increasing water and natural gas costs, etc.) that may affect the longterm viability and growth of existing core industries and small business. Include regional green and clean energy businesses in a “short list” of industries to focus these initial outreach and business retention efforts during Phase 1.

CR-1c In partnership with organizations such as the Workforce Development Board of Contra Costa County or Contra Costa College, create a green workforce development program to connect Pinole residents to workforce development training courses for climate industries with high-road jobs. Additionally, use the program to develop a network of local professional associations active in Pinole and to incorporate green workforce development training courses into the periodic “Pinole Workforce Development Consortium” meetings identified in the Economic Development Strategy. Focus this program on members of the most disadvantaged and vulnerable communities in the City and track enrollment and success rate by zip code to monitor the reach and distribution of the initiative.

CR-1d Partner with the Contra Costa County Green Business Program to help small- and medium-sized businesses in Pinole minimize their impact on the environment and increase the number of certified Green Businesses in Pinole.

CR-1e Create a Green Technology Incubator in partnership with the Workforce Development Board of Contra Costa County, Contra Costa College, the Renaissance Entrepreneurship Center, the East Bay Economic Development Alliance, or similar partners, to help startups and companies working on innovative solutions for climate-related challenges to succeed in the market. The Green Technology Incubator would provide access to funding through identification and partnership opportunities for grants, technical assistance, networking support, and community exposure.

CR-1f Incentivize optimal use of properties with a water view by adoption of Municipal Code Amendments allowing for height exceptions for mixed use developments that include top-floor restaurants that are dense, transit rich and connected to Pinole's growing active transportation network.

Page 185 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 18 Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
CR-1g Based on the findings and recommendation of the broadband feasibility study, a subsidy or grant program may be developed to improve existing infrastructure of multi-family units (i.e., upgrade internal wiring etc.) to update policies to increase Pinole residents' work-from-home rate, including incorporating work-from-home strategies into the Transportation Demand Management standards of Action TR3a.

CR-1h Explore locations within the City to create a plan to develop a climate resilience district. The district would receive focused City resources, support, partnerships with local businesses, and engagement to develop resilient communities.

Examples could include the Pinole Valley area to focus on funding projects related to wildfire risk, for example.

Strategy BE: Building Energy
Measure BE-1. Electrify 100% of new construction in the City by 2024.

BE-1a Adopt a single margin source energy score or more stringent ordinance in 2024 to avoid new natural gas construction.
2030: 1,509
2045: 5,962
BE-1b Partner with organizations such as MCE, Bay Area Regional Energy Network (BayREN), the Building Decarbonization Coalition and the U.S. Green Building Council (USGBC) to compile a suite of case studies (e.g., document/guide on allelectric best practices and examples applicable to Pinole or the Bay Area) and cost-effective strategies (e.g., energy efficiency improvements) for electric buildings by prototype. Provide digital copies on the City’s website and hard copies at City Hall for residents and business owners to review and utilize.

BE-1c Partner with organizations such as MCE, BayREN, the Building Decarbonization Coalition, and USGBC to educate building owners, developers, and contractors on the cost savings, environmental benefits, and versatility associated with allelectric construction, as well as the advantages all-electric construction provide for United States Green Building Council LEED certification. Utilize the case studies and cost-effective strategies as well as existing resources such as those provided by MCE as educational materials and share the information on the City’s website, at City events (such as Dumpster Day and Earth Walk), and at the City’s permit counter.

BE-1d Partner with PG&E to conduct an electrification infrastructure and capacity feasibility study to identify expected increases in electricity demand due to building and vehicle electrification and identify infrastructure improvements (including local renewable energy and storage projects) to increase capacity to meet demand. During this process, work with MCE to provide projections on load changes due to electrification.

BE-1e Partner with MCE, the WFDBCCC and/or other organizations to host regular workforce development trainings for installers, local contractors, and building owners/operators. Trainings would provide financial resources and technical requirements, including information on new electric appliances and approaches to electrification. Partner with community-based organizations to connect members of vulnerable communities to these training programs in plain language and in a culturally appropriate manner.

BE-1f Advocate for regional policy and programs that allow for utility rates that are supportive of electrification (i.e., electricity rates lower than natural gas rates).

Page 186 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 19
Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
Measure BE-2. Electrify existing residential buildings to reduce natural gas consumption 26% by 2030 and 100% by 2045.

BE-2a Adopt a reach code in 2024 requiring all central air conditioning unit installations and replacements be two-way, providing both heating and cooling with a single unit for residential buildings.

The ordinance would apply to projects after calendar year 2024. The ordinance would be implemented through the building permit process. 2030: 4,778
2045: 19,273
BE-2b After calendar year 2024, include major renovations (i.e., projects that affect over 50% of the building, add an additional 50% of gross floor space to the building, or value more than 50% of the assessed value of the property at time of application submittal) in the all-electric new building requirements.

BE-2c Complete a residential existing building electrification feasibility analysis by 2024 to determine the upfront and on-bill costs associated with building electrification strategies and draw on existing ordinances from similar jurisdictions to identify barriers to replacement and permit compliance (including equity barriers). This information will be used to inform and support future updates to the existing building electrification ordinances as well as the building electrification resource center (Action BE-2e).

BE-2d Partner with Contra Costa County to create a virtual all-electric building resource center to provide residents information on available electrification assessments, turn-key installations by BayREN/state vetted contractors, low up-front costs and on-bill financing, and equipment and labor warranties.

BE-2e As part of the building electrification resource center, provide free assessments to rental and multi-family properties, as well as seniors and residents living on low incomes.

BE-2f Partner with MCE and PG&E to review incentives, rebates, and on-bill financing options for procedural equity and then update the incentives to remove the identified barriers.

BE-2g Partner with properties in Pinole that provide deed-restricted affordable housing, MCE, PG&E, and BayREN to initiate and complete an affordable housing electrification pilot project. Project will implement energy efficiency strategies to mitigate increased energy bills for occupants. Promote the pilot project as a case study for future projects in the City.

BE-2h Work with MCE and PG&E to conduct a cost-effectiveness study and design electricity and natural gas billing rates that make electrification the most costeffective option to reduce energy bill burdens for residents living on low and medium incomes.

BE-2i Provide education around cooking with electric appliances and partner with local chefs and/or restaurants to host cooking demonstrations at community events such as the Farmers’ Market. Integrate locally sourced food into the demonstrations to also educate community members on the GHG emission reduction and resilience benefits of local food.

Page 187 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 20 Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
BE-2j Enforce ordinance compliance through a comprehensive permitting compliance program which may include, but is not limited to:
▪ Providing dedicated time for routine staff training to incorporate into existing building inspections.
▪ Imposing fees for noncompliance to offset staff costs and encouraging voluntary compliance.
▪ Establishing easy-to-understand web-based compliance checklists and permit applications.
▪ Facilitating online permitting.
▪ Providing zero-cost permit fees for heat pump installations.

BE-2k Develop and implement a water heater loan program where residents who are replacing their natural gas-powered water heaters with electric-powered water heaters at the end of their useful lives can borrow or rent at no cost a working natural gas water heater from the City for a limited period of time (e.g., three weeks) to use during any electrical panel upgrade requirements to install an electric water heater. Participation in this program could serve as a mechanism to support thoughtful residential transition. Consider expanding the loan program to induction stoves as well.

BE-2l Partner with Rising Sun, or similar entity, to continue providing “Green House Calls” to residents to recommend energy-saving appliances and programs to help offset the costs of electrification.

BE-2m Work with PG&E to identify opportunities for natural gas infrastructure pruning to reduce the chance of stranded assets, provide potential funding, and establish an efficient transition to carbon-neutral buildings. Engage local developers, MCE, and vulnerable populations to assess the feasibility of adopting an end-of-flow ordinance that would require natural gas lines be capped and decommissioned in existing buildings by 2045.

BE-2n Adopt an end-of-flow ordinance that would require natural gas lines by capped and decommissioned in existing buildings by 2045.

BE-2o Explore the development of a revolving fund to integrate wall batteries for energy storage with Pinole’s Energy Enhancement Rebate Program, aiming to enhance energy efficiency, sustainability, and financial viability for a more resilient energy future.

Measure BE-3. Electrify existing commercial and mixed-use (i.e., combined commercial and residential) buildings to reduce natural gas consumption 26% by 2030 and 100% by 2045.

BE-3a Complete an existing commercial building electrification feasibility analysis by 2024 to determine the upfront and on-bill costs associated with building electrification strategies and draw on existing ordinances from similar jurisdictions to identify barriers to replacement and permit compliance (including equity barriers).
2030: 997
2045: 5,868
BE-3b Adopt a reach code in 2024 requiring all central air conditioning unit installations and replacements be two-way, providing both heating and cooling with a single unit for commercial and mixed-use buildings. The ordinance will be implemented through the building permit process. Track annual progress on commercial and mixed-use building electrification through the same permit tracking program developed for residential building electrification.

Page 188 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 21
Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
BE-3c Evaluate the success of the Pinole Energy Enhance Rebate Program which offers additional rebates to Pinole residents for energy efficiency improvements stacked on top of federal, state, or regional rebates or discounts. Work with Contra Costa County Department of Conservation and Development to restructure the pilot program as needed. Seek annual grant funding sources to sustain and support the program through.

BE-3d Develop a building performance standard program to meet a specific level of energy use per square foot for all commercial and industrial buildings over 20,000 square feet.

Implementation and compliance support, including resources and tools which will be implemented through four stages:

1. Pre-development phase – Stage 1 – Staff to receive technical assistance from the Building Technologies Office in the Federal Office of Energy Efficiency and Renewable Energy (EERE). Per the EERE, technical assistance may take the form of:
a. Building stock analyses, including analysis of energy and emission impacts associated with building performance
standard adoption
b. Performance target-setting and trajectories
c. Measure and technology prioritization and packaging
d. Cost-effectiveness analyses

2. Data collection phase – Stage 2 – All commercial and industrial building owners with floor area over 20,000 square feet report electricity and natural gas data through energy star portfolio manager.

3. Retro commissioning phase – Stage 3 – All covered building owners complete a retro commissioning process to identify and correct system inefficiencies while identifying opportunities for electrification and downsizing of oversized equipment.

4. GHG Performance Standard – Stage 4 – Implement a building performance standard that requires buildings to meet a specific GHG performance level.

BE-3e Conduct targeted outreach and complete tailored campaigns during development of the building performance program (Action BE-3d) and electrification ordinance (Action BE-3b) to identify potential barriers to commercial and mixed-use electrification (including equity barriers) and educate commercial and mixed-use property owners on the potential cost savings and other benefits of electrification. Include targeted outreach to building owners that rent or lease space to small businesses and minority-owned businesses as well as the business owners and conduct a survey to such businesses to identify specific resources needed to support an equitable building electrification.

BE-3f Partner with Contra Costa Health Services to provide small and minority-owned businesses/commercial property owners or property owners that rent or lease space to small or minority-owned business, electrification assessments, turn-key installations by BayREN/state vetted contractors, low up-front costs, and equipment and labor warranties through the building electrification resource center (Action BE-2e). Additionally, partner with MCE or PG&E to provide on-bill financing.

BE-3g Partner with the Bay Area Council, Bay Front Chamber of Commerce, and Contra Cost County Green Business Program to inform, encourage, and facilitate electrification for commercial business owners.

Page 189 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 22 Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
BE-3h Review incentives and rebates (from Action BE-3g) for procedural equity and develop a process so that existing and updated incentive programs continue to be equitably distributed to the community. Hurdles to equitable implementation could include credit checks, excessive procedural roadblocks, and lack of targeted outreach.

BE-3i Work with MCE, PG&E, and BayREN to incentivize all-electric retrofits by combining rebate programs and financing mechanisms to create cost-effective electrification packages and develop bulk-purchasing opportunities for multi-unit development owners. Additionally, work with BayREN to educate the business community about the available incentives and include direct outreach to small, and frontline community-owned businesses and property owners who rent and lease space to frontline community-owned businesses.

BE-3j Work with BayREN to identify highly efficient net zero energy building owners that meet the CPUC’s hard-to-reach criteria and publicize commercial tax breaks to these building owners as well as commercial developers in Pinole.

BE-3k Re-evaluate the building performance program (Action BE-3d) every three years to gauge implementation progress and phase expansion of program to smaller buildings.

BE-3l Review and update Section 15.46.020 of the Municipal Code to require upon a transfer of ownership the disclosure of additional relevant weatherization information (e.g., ventilation standards, wall insulation, and installation of programmable thermostats) for residences and commercial buildings over 5,000 square feet. As part of this, work with Contra Costa County Department of Conservation and Development to promote the Weatherization Program for qualifying residents. Additionally, develop a City-specific disclosure checklist and coordinate with realtors/brokers to engrain the City’s resale requirements into their work with buyers and sellers.

Measure BE.4 Work with MCE to provide carbon-free and renewable energy to at least 95% of the community by 2030.

BE-4a Support MCE in building capacity and funding to provide all Pinole customers 100% carbon-free and renewable energy and adopt a City resolution to enroll all Pinole residents and businesses in carbon-free and renewable from MCE (e.g., MCE’s Deep Green option) by 2030. The resolution shall include identification of a funding or subsidy plan/program to avoid cost increases to customers enrolled in the California Alternate Rates for Energy (CARE) or Family Electric Rate Assistance (FERA) programs (Action BE-4b).
2030: 3,200
2045: 0
BE-4b In support of Action BE-4a, work with MCE to create a funding and subsidy plan/program for customers enrolled in the CARE or FERA programs to opt-up to MCE’s Deep Green option. This may include subsidizing costs to customers who participate in CARE/FERA programs through non-discounted customer rate increase or obtainment of funding for vulnerable communities.

BE-4c Continue to work with MCE to conduct an annual analysis of opt-out rates in the City and expand the research to understand why residents and businesses opt out of MCE. Include targeted outreach to residents living on low and fixed incomes and vulnerable communities to identify barriers to remaining with MCE.

Page 190 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 23
Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
BE-4d Continue to partner with MCE to conduct educational campaigns, including tabling at community events, establishing informational resources on the City's website, regularly posting on social media, and developing energy bill inserts, to highlight the benefits of 100% renewable energy and promote the available incentives.

BE-4e Conduct targeted outreach campaigns to convert PG&E direct access customers to MCE by promoting available incentives and promoting the economic and business benefits of 100% renewable energy.

Measure BE-5. Increase generation and storage of local community-scale renewable energy.

BE-5a Adopt a PV (Solar) Ordinance requiring newly constructed and majorly renovated multi-family and commercial buildings to install PV systems and storage that meet minimum requirements of Tier 2 Voluntary Standards under CalGreen. 2030: N/A
2045: N/A
BE-5b Continue to establish and streamline standards and permit requirements for electrification-related installations and battery storage systems to allow for easier implementation of these technologies in the City.

BE-5c Install a co-located community solar and storage facility to benefit affordable housing sites using Equity Resilience Incentives under the Self-Generation Incentive Program available through the California Public Utilities Commission.

BE-5d Collaborate with PG&E, MCE, and/or other community partners to support and incentivize local on-site energy generation and storage resources. This could include:
▪ Connecting home and business owners, particularly those in vulnerable communities, to incentives for renewable energy and storage including Net Metering Programs through PG&E for bill credits, the Disadvantaged Communities-single-family Solar Homes (DAC_SASH) program, SelfGeneration Incentive Program (SGIP), and Equity Resilience rebates that provide an upfront rebate for battery storage, as well as the federal investment tax credit.
▪ Promoting installation of storage technology in concert with renewable energy infrastructure through multilingual education programs, outreach, and information provided via City platforms.
▪ Providing workshops to large commercial developers and large business property owners on the benefits of microgrids and energy resilience. ▪ Creating a strike team to conduct engagement efforts for the commercial sector to identify ways the City can support commercial energy storage installations and neighborhood scale microgrid opportunities.

BE-5e Expand the partnership with GRID Alternatives through increased funding/support and promote the benefits of renewable energy through multilingual educational programs to facilitate an equitable transition to renewable energy.

BE-5f Partner with CBOs and homeowner’s associations (HOAs) through the City’s professional grant writing consultant, who will support the identification, conceptualization, preparation, and submittal of grant applications to secure funding for community-scale renewable energy projects. Utilize any grant funded projects as City pilot projects to demonstrate the success of the program and opportunities available.

Page 191 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 24 Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
Strategy TR: Transportation
Measure TR-1. Create a safe and connected active transportation network linked to Pinole Creek to increase active transportation mode share to 5.5% by 2030 and 11.5% by 2045.

TR-1a Conduct an analysis of existing bicycle and pedestrian conditions during the development of the Active Transportation Plan with a focus on identifying residential communities, commercial uses, schools, and open spaces currently disconnected from the Creek, due to freeways and lack of connections on busy roads. Build on the interactive map created to solicit community input regarding the Active Transportation Plan on “Pinole Speaks,” the City’s public input website to display the active transportation conditions identified and allow community feedback through the webpage.
2030: 107
2045: 256
TR-1b Complete the Active Transportation Plan with a focus on creating safe and connected active transportation networks that link residential neighborhoods, schools, and commercial centers to Pinole Creek and thereby to each other. The plan will include:
▪ A prioritized list of pathways to be installed or upgraded to include shared-use paths, buffered bike lanes, bike boulevards, and separated bikeways.
▪ A prioritized list of bicycle parking or storage and equipment repair infrastructure.
▪ Information on additional infrastructure installed as part of the plan, such as trash and recycling receptacles to prevent waste from entering the creek due to increased usage.
▪ A schedule for reducing vehicle speed limits at prioritized locations. ▪ Available funding sources for infrastructure buildout. ▪ Use of sustainable materials, when feasible
Prioritization shall focus on achieving an equitable active transportation system where all Pinole residents have access to critical connections and mobility options.

TR-1c Partner with Contra Costa Transportation Authority to pursue funding from Caltrans’ Active Transportation Program or similar funding opportunities to implement improvements from the City’s Active Transportation Plan.

TR-1d Partner with entities such as the Metropolitan Transportation Commission, 511 Contra Costa, or the Contra Costa Transportation Authority to expand existing rebate programs to help families living on low- and fixed-incomes purchase alternative modes of transportation (e.g., bicycles, scooters, rollerblades, skates, skateboards) and appropriate safety gear.

TR-1e Partner with Bike East Bay and/or other non-profit groups to periodically close streets with connections and vistas of the Creek to cars to host walk/bike/roll (car-free) community events that demonstrate the benefits of a safe and connected active transportation network. Coincide these community events with regular active transportation events to encourage and reward residents for participation.

TR-1f Partner with schools, youth sports leagues, the Pinole Police Department, and community groups such as Friends of Pinole Creek Watershed, 511 Contra Costa, Pinole Valley Earth Team, Pinole Rotary, Pinole Community Services Commission and local Tribes to teach students and families bicycle and pedestrian safety and educate them on the safe route availability and the health and environmental benefits of walking and bicycling, as well as the history of the Pinole Creek ecosystem and surrounding natural lands.

Page 192 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 25
Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
TR-1g Partner with an electric bike provider or rental company to pilot an electric-bike rental program at the Pinole Library. Track use of the program, including equity indicators, to monitor its success and evaluate continuation of the program.

TR-1h Install bike repair stations along the Pinole Creek and consider partnering with a local bike shop to provide quarterly bicycle repair support for residents traveling along the bike path or at a designated, central location.

TR-1i Implement 100% of the Active Transportation Plan by 2030 to achieve a 5.5% active transportation mode share by 2030 and 11.5% by 2045.

Measure TR-2. Implement public and shared transit improvements and programs to achieve a 14% public transit mode share by 2030 and 18% by 2045.

TR-2a Partner with Western Contra Costa Transit (WestCAT) to conduct a prioritization study to determine transit priority corridors and best potential locations for WestCAT expansions (including the Hercules Intermodal Transit Center and Richmond BART Station) to reduce transit travel times from/to Pinole. The study shall include an analysis of existing stops and schedules, a survey of existing commuter patterns, analysis of potential latent demand, and targeted outreach to residents living on low- and moderate-incomes and members of vulnerable communities to understand the concerns around or equity barriers to using public and/or shared transit.
2030: 256
2045: 559
TR-2b Conduct a feasibility study to assess the potential impacts and costs of a parkand-ride facility in Pinole and identify potential locations.

TR-2c Work with WestCAT to complete an analysis of potential design improvements, such as seating and shading bus stops and along active transportation routes to increase use.

TR-2d Work with WestCAT to improve transit accessibility for people with disabilities by ensuring physical accessibility (i.e., ramps, lifts, and tactile paving), providing both audio and visual information; training staff on how to assist people with disabilities and handle equipment; and actively engage people with disabilities in the decision-making process.

TR-2e Partner with WestCAT and the Contra Costa Transportation Authority to implement a free public transit pilot program for students, foster youth, and unhoused youth in Pinole that makes it free for participants to travel via WestCAT.

TR-2f Based on the prioritization studies (TR-2a - TR-2c), develop a plan to prioritize infrastructure improvements in existing neighborhoods that increase access to and use of public transit. The plan shall include projects and timelines to:
▪ Expand WestCAT routes and schedules
▪ Cohesively label all existing and new stops
▪ Provide safe and convenient shelters with benches, shade. hand sanitizing stations, area maps, and native plants
▪ Establish a schedule to annually monitor routes and schedules to confirm they meet the needs of the community
TR-2g Engage with Caltrans to design and install a park and ride facility, which may include implementing efficient traffic flow systems.

Page 193 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 26 Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
TR-2h Partner with 511 Contra Costa to educate Pinole residents, commuters, and students on available transit opportunities through free commute consultations, and provide qualifying commuters with financial incentives to take transit, such as pre-loaded Clipper cards and a Guaranteed Ride Home program.

TR-2i Partner with WestCAT and the Contra Costa Transportation Authority to pursue funding for the prioritization study and plan (TR-2a - c and TR-2f) through MTC’s One Bay Area Grant funding, or similar funding opportunities.

TR-2j Partner with the West Contra Costa Unified School District and/or private schools to evaluate mobility needs and expand bus routes where necessary to increase access to and use of school bus transportation to schools, including services for after-school hours for student and their guardians.

Measure TR-3. Develop programs and policies to discourage driving single passenger vehicles and to support the active transportation and public transit mode share goals of Measures TR-1 and TR-2.

TR-3a Adopt an ordinance requiring all employers to develop a Transportation Demand Management (TDM) Plan and require large employers (i.e., more than 25 employees) to include money-based incentives for employees to bike, walk, carpool, or take public transit to work. Additionally, complete a comprehensive study to establish an Average Vehicle Ridership (AVR) that accurately reflects Measure TR-1 and TR-2's goals.
2030: N/A
2045: N/A
TR-3b Create a Pinole Parklets Program to install parklets in the downtown and other commercial areas of the City and engage with businesses to gain sponsorship for the parklets.

TR-3c Require informative signage be included at the parklets designed through the Pinole Parklet Program (Action TR-3b) that provide information on the benefits of ecosystem services at all scales, and the health impacts associated with reducing single occupancy vehicle trips.

TR-3d Partner with local jurisdictions, public transit providers, and CBOs to identify gaps in the transportation network that can be prioritized for cross-jurisdictional collaboration to connect the region and reduce the need for single occupancy vehicles.

TR-3e Conduct an analysis of the potential community impacts and feasibility and benefits of implementing disincentive-based policies for driving single-passenger vehicles, including a congestion charge program, limiting parking options, increased local taxes (income tax, gasoline tax, or car registration tax), and Transportation Network Companies (TNC) user taxes. Include analysis of potential equity impacts of the policies and identification of potential equity metrics to address equity concerns when developing policies.

TR-3f Consider opportunities to fund transportation system improvements through disincentive-based program revenues and/or a tiered TDM fee for employers who do not achieve the established AVR by 2030 to establish an equitable transition to more sustainable modes of transportation.

TR-3g Conduct AVR surveys of Pinole businesses every three years to determine weekday AVR and mode share split as well as perceived barriers to telecommuting and alternative modes of transportation (i.e., modes other than single occupancy vehicles), and interest in sustainable transportation amenities, infrastructure, and events/resources.

Page 194 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 27
Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
TR-3h Consider development applications that will improve the community by increasing density in transit-rich areas and connecting residents of multi-family, and/or affordable housing sites to public and shared transit options.

Measure TR-4. Increase passenger zero-emission vehicle (ZEV) use and adoption to 33% by 2030 and 100% by 2045.

TR-4a Adopt an EV reach code by 2025 requiring new commercial and multifamily construction to install the minimum number of EV chargers based on Tier 2 CalGreen requirements (20% of total parking spaces).
2030: 3,832
2045: 13,839
TR-4b Adopt an EV reach code by 2026 requiring major multifamily building retrofits to install the minimum number of EV chargers based on Tier 2 CalGreen requirements (20% of total parking spaces) and major commercial retrofits (with a square footage larger than 10,000 square feet or modifications for electric service panels) to meet CalGreen requirements for “EV Ready” charging spaces and infrastructure.

TR-4c Adopt an ordinance that bans the development of any new, or expansion, renovation or replacement of any existing, fossil fuel stations in the City prior to the expiration of the Urgency Ordinance. The process should include:

1. Determine and define an outreach process.

2. Prepare a General Plan, Specific Plan, and Zoning Ordinance text amendment, which would establish Service Station land use as Not Permitted by Table 17.20.030-1 in the PMC, making all existing service stations legal non-conforming and subject to Section 17.14.080 of the Municipal Code.

3. Determine if any streamlining enhancements to existing provisions in the PMC that incentivize the expansion, modification, or retrofit of an existing service station to incorporate biodiesel or other alternative fuels or charging stations for electric vehicles should be considered.

4. Take the Amendments through the required public review process, including Planning Commission recommendation and City Council adoption.

5. Continue to direct staff to explore options for additional charging at City-owned/maintained properties and private facilities for public benefit.

TR-4d Update Pinole’s permit process for EV chargers to create a streamlined process for residents and businesses that is consistent with the State’s Electric Vehicle Charging Station Permitting Guidebook (as well as AB 970, AB 1236).

TR-4e Prepare a feasibility study to evaluate opportunities for installation of EV charging stations at City owned facilities. The feasibility study will assess electrical capacity, electrical demand, financial constraints, and parking utilization to provide a prioritized list of locations to install new publicly accessible EV charging stations.

TR-4f In the feasibility study, include evaluation of opportunities and prioritization of locations to increase the equitable distribution of publicly available EV chargers to residents of multi-family homes and residents living on low- and moderateincomes, as well as consideration for optimizing daytime charging.

TR-4g Work with MCE and PG&E to incentivize residential electric vehicle charger installations and panel upgrades through on-bill financing. Promote the incentives through multi-lingual outreach material on the City’s website and at community events.

Page 195 of 945 ends

City of Pinole
Climate Action and Adaptation Plan and CEQA GHG Emissions Thresholds 28 Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
TR-4h Work with MCE to promote and provide technical assistance for their Residential EV Rate Plan and MCE Sync charging app to help community members charge during off-peak hours and save money on home charging.

TR-4i Coordinate with community-based organizations, local agencies, and non-profits such as Charge Up Contra Costa,511 Contra Cost, and Cool the Earth to conduct zero-emission vehicle (ZEV) education events for residents and targeted events for residents living on low- and moderate- incomes as well as residents living in multi-family buildings that would engage the community to evaluate the barriers to ZEV adoption, promote information on the costs and benefits of owning ZEVs, and detail the steps on how to receive incentives for ZEVs.

TR-4j Work with Contra Costa County to create an EV charging etiquette policy that encourages a seamless charging experience, fosters community collaboration, and promotes sustainable practices for the benefit of all electric vehicle users and the environment.

TR-4k Develop an equitable charging fee structure that provides accessibility for all users, regardless of socio-economic background, fostering inclusivity and promoting widespread adoption of electric vehicles.

TR-4l Develop outreach and education materials and distribute them to local businesses, property owners, and developers on the financial (e.g., new funding streams), environmental, and health, and safety benefits of ZEVs. Provide information on available funding opportunities and the City’s streamlined permitting process. Additionally, as part of this process, include information on EV battery recycling to dispel myths, ease disposal concerns, and promote sustainable practices grounded in science.

TR-4m Collaborate with neighboring jurisdictions and the Contra Costa Transportation Authority to develop a zero-emission vehicle car share network.

TR-4n Coordinate with car share companies and community-groups to develop an affordable, zero-emission vehicle car share program to serve affordable housing and/or multifamily developments with a priority to target residents living on lowand moderate-incomes.

TR-4o Based on the prioritized list of locations developed through actions TR-4d and TR4e, install at least 270 new publicly accessible Level II and DC Fast chargers by 2030 and 935 by 2045, through public-private partnerships and on City-owned properties.

Measure TR-5. Increase commercial zero-emission vehicle (ZEV) use and adoption to 25% by 2030 and 100% by 2045.

TR-5a Work with the Bay Area Air Quality Management District, Pacific Gas & Electric, and or similar entities to identify and provide funding for electric vehicles and charging infrastructure for disadvantaged or vulnerable business owners. 2030: 2,303
2045: 8,186
TR-5b Create a summary of commercial vehicle fleets in Pinole and identify employers to work with to accelerate ZEV adoption through targeted education.

TR-5c Encourage commercial vehicle fleet operators to accelerate electrification by providing them educational material on the benefits of zero emission vehicles (e.g., fuel cost savings through networked charging and current availability of zero emission vehicles ahead of State mandates), educating them on the City’s streamlined permitting process, and compiling and distributing information on potential funding opportunities.

TR-5d Implement local tax breaks to incentivize commercial fleet electrification.

Page 196 of 945 ends

Initial Study
Final Initial Study– Negative Declaration 29
Move
ID # Strategies and Respective Supporting Measures and Actions Anticipated GHG
Emissions
Reduction by 2030
(MT of CO2e)1
TR-5e Investigate opportunities to help fund additional EV charging infrastructure by leveraging public/private partnerships and ensuring the City is charging for EV infrastructure use at City-owned facilities.

Measure TR-6. Electrify or otherwise decarbonize 8% of off-road equipment operations by 2030 and 100% by 2045.

TR-6a Create a phased ordinance by 2026 to ban the local operation of gasoline and diesel-powered off-road equipment by type (e.g., lawn and garden, construction), including banning local operation of gasoline and diesel-powered small off-road equipment (SORE) by 2028. Update the ordinance based on a regular review of relevant state regulations, regional rules, and available technology. 2030: 1,245
2045: 10,721
TR-6b Establish a communication and outreach program to raise awareness of the ordinance, educate community members on the benefits of and funding opportunities for offroad decarbonization, and collect data on offroad fleet and decarbonization trends in the community (e.g., through outreach sampling and surveying).

TR-6c As part of Action TR-6b’s program, investigate off-road equipment fleets in the City to identify fleets with the highest decarbonization potential, fleets owned by small and minority businesses that will need targeted support and incentives to decarbonize or electrify, and fleets that do not currently have zero-emission alternatives. Utilize these findings to develop the phased off-road ordinances.

TR-6d As part of Action TR-6b’s program, develop a multi-lingual Off-road Equipment Replacement Outreach Campaign that provides information to contractors, residents, and fleet operators in the City, with a target towards those identified in Action TR-6c. Information should include equivalent alternatives to fossil-fueled off-road equipment, public health, and safety benefits of alternative equipment technology, and funding opportunities available (i.e., Clean Off-Road Equipment Voucher Incentive Program [CORE]).

TR-6e Partner with surrounding jurisdictions and the Bay Area Air Quality Management District (BAAQMD) to develop a rebate and incentive program for upgrading offroad equipment and switching to electric or biofuels. Develop the program with a focus on procedural equity and prioritize funding distribution to disadvantaged and vulnerable communities.

Strategy SW: Solid Waste
Measure SW.1. By 2025, reduce organics to landfill by 75% to meet or exceed SB 1383 organic waste diversion requirements through composting and edible food recovery.

SW-1a Through MOUs with the City's waste haulers, establish requirements by 2024 for waste haulers to perform annual performance assessments to determine compliance with SB 1383 requirements. If the performance assessments show the hauler is not on target, meet with the hauler and RecycleMore staff to establish prioritized actions for the hauler and/or RecycleMore to complete.

Additionally, utilize the assessments to identify trends in contamination and integrate lessons learned into the educational program as part of Action SW-1e. 2030: 2,934
2045: 3,570

Page 197 of 945 ends
← All documents from this meeting