Cities Index.
Agenda packet

Rancho Cucamonga City Council
August 19, 2026

Document
Agenda packet
Meeting
August 19, 2026
Body
Rancho Cucamonga City Council
Pages
22,009,999
Original file
190.7 MB
Text extracted from the city's file for reading and search. Open the original on ranchocucamonga.primegov.com. That file is the official record.

PSA with Professional Liability Insurance (Non-Design) Page 5 Last Revised: 11/12/2020
representative, Consultant shall be responsible for its safe return to City. Under no circumstances shall Consultant fail to deliver any draft or final designs, plans, drawings, reports or specifications to City upon written demand by City for their delivery, notwithstanding any disputes between Consultant and City concerning payment, performance of the contract, or otherwise. This covenant shall survive the termination of this Agreement. City’s reuse of the Work Product for any purpose other than the Project, shall be at City’s sole risk.

7.2. Assignment of Intellectual Property Interests: Upon execution of this Agreement and to the extent not otherwise conveyed to City by Section 7.1, above, the Consultant shall be deemed to grant and assign to City, and shall require all of its subcontractors to assign to City, all ownership rights, and all common law and statutory copyrights, trademarks, and other intellectual and proprietary property rights relating to the Work Product and the Project itself, and Consultant shall disclaim and retain no rights whatsoever as to any of the Work Product, to the maximum extent permitted by law.

City shall be entitled to utilize the Work Product for any and all purposes, including but not limited to constructing, using, maintaining, altering, adding to, restoring, rebuilding and publicizing the Project or any aspect of the Project.

7.3 Title to Intellectual Property. Consultant warrants and represents that it has secured all necessary licenses, consents or approvals to use any instrumentality, thing or component as to which any intellectual property right exists, including computer software, used in the rendering of the Services and the production of the Work Product and/or materials produced under this Agreement, and that City has full legal title to and the right to reproduce any of the Work Product. Consultant shall defend, indemnify and hold City, and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of city officials, harmless from any loss, claim or liability in any way related to a claim that City’s use is violating federal, state or local laws, or any contractual provisions, relating to trade names, licenses, franchises, patents or other means of protecting intellectual property rights and/or interests in products or inventions.

Consultant shall bear all costs arising from the use of patented, copyrighted, trade secret or trademarked documents, materials, software, equipment, devices or processes used or incorporated in the Services and materials produced under this Agreement. In the event City’s use of any of the Work Product is held to constitute an infringement and any use thereof is enjoined, Consultant, at its expense, shall: (a) secure for City the right to continue using the Work Product by suspension of any injunction or by procuring a license or licenses for City; or (b) modify the Work Product so that it becomes noninfringing. This covenant shall survive the termination of this Agreement.

8. Status as Independent Contractor. Consultant is, and shall at all times remain as to City, a wholly independent contractor. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act as an agent of City. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its officers, agents or

Page 11445555 ends

PSA with Professional Liability Insurance (Non-Design) Page 6 Last Revised: 11/12/2020
employees are in any manner employees of City. Consultant shall pay all required taxes on amounts paid to Consultant under this Agreement, and to defend, indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement.

Consultant shall fully comply with the workers’ compensation law regarding Consultant and Consultant’s employees.

9. Confidentiality. Consultant may have access to financial, accounting, statistical, and personnel data of individuals and City employees. Consultant covenants that all data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are confidential and shall not be disclosed by Consultant without prior written authorization by City. City shall grant such authorization if applicable law requires disclosure. All City data shall be returned to City upon the termination of this Agreement. Consultant’s covenant under this section shall survive the termination of this Agreement. This provision shall not apply to information in whatever form that is in the public domain, nor shall it restrict the Consultant from giving notices required by law or complying with an order to provide information or data when such an order is issued by a court, administrative agency or other legitimate authority, or if disclosure is otherwise permitted by law and reasonably necessary for the Consultant to defend itself from any legal action or claim.

10. Conflict of Interest.

10.1 Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the Services, or which would conflict in any manner with the performance of the Services. Consultant further covenants that, in performance of this Agreement, no person having any such interest shall be employed by it. Furthermore, Consultant shall avoid the appearance of having any interest, which would conflict in any manner with the performance of the Services.

Consultant shall not accept any employment or representation during the term of this Agreement which is or may likely make Consultant “financially interested” (as provided in California Government Code §§1090 and 87100) in any decision made by City on any matter in connection with which Consultant has been retained. Consultant or its employees may be required to disclose financial interests that may foreseeably be materially affected by the work performed under this Agreement pursuant to California Government Code § 87100 et seq and regulations promulgated by the Fair Political Practices Commission.

10.2 Consultant further represents that it has not employed or retained any person or entity, other than a bona fide employee working exclusively for Consultant, to solicit or obtain this Agreement. Consultant has not paid or agreed to pay any person or entity, other than a bona fide employee working exclusively for Consultant, any fee, commission, gift, percentage, or any other consideration contingent upon the execution of this Agreement. Upon any breach or violation of this warranty, City shall have the right, at its sole and absolute discretion, to terminate this Agreement without further liability, or

Page 11445566 ends

PSA with Professional Liability Insurance (Non-Design) Page 7 Last Revised: 11/12/2020
to deduct from any sums payable to Consultant hereunder the full amount or value of any such fee, commission, percentage or gift.

10.3 Consultant has no knowledge that any officer or employee of City has any interest, whether contractual, noncontractual, financial, proprietary, or otherwise, in this transaction or in the business of Consultant, and that if any such interest comes to the knowledge of Consultant at any time during the term of this Agreement, Consultant shall immediately make a complete, written disclosure of such interest to City, even if such interest would not be deemed a prohibited “conflict of interest” under applicable laws as described in subsection 10.1.

11. Indemnification.

11.1 Professional Services. In connection with its professional services, the Consultant shall defend, hold harmless and indemnify City, and its elected officials, officers, employees, servants, volunteers, and agents serving as independent contractors in the role of city or agency officials, (collectively, “Indemnitees”), with respect to any and all damages, liabilities, losses, reasonable defense costs or expenses (collectively, “Claims”), including but not limited to liability for death or injury to any person and injury to any property, to the extent the same out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant or any of its officers, employees, subcontractors, consultants, or agents in the performance of its professional services under this Agreement. Consultant shall reimburse all reasonable defense costs and expenses, including actual attorney’s fees and experts’ costs incurred in connection with such defense.

11.2 Other Indemnities. In connection with all Claims not covered by Section 11.1, the Consultant shall defend, hold harmless and indemnify the Indemnitees with respect to any and all Claims including but not limited to Claims relating to death or injury to any person and injury to any property, which arise out of, pertain to, or relate to the non-professional acts, omissions, activities or operations of Consultant or any of its officers, employees, subcontractors, consultants, or agents in the performance of this Agreement. Consultant shall defend Indemnitees in any action or actions filed in connection with any such Claims with counsel of City’s choice, and shall pay all costs and expenses, including actual attorney’s fees and experts’ costs incurred in connection with such defense.

11.3 Nonwaiver of Rights. Indemnitees do not, and shall not, waive any rights that they may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement.

11.4 Waiver of Right of Subrogation. Except as otherwise expressly provided in this Agreement, Consultant, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Consultant.

Page 11445577 ends

PSA with Professional Liability Insurance (Non-Design) Page 8 Last Revised: 11/12/2020

11.5 Survival. The provisions of this Section 11 shall survive the termination of the Agreement and are in addition to any other rights or remedies which Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against Consultant shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision.

12. Insurance.

12.1 Liability Insurance. Consultant shall procure and maintain in full force and effect for the duration of this Agreement, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the services hereunder by Consultant, and/or its agents, representatives, employees and subcontractors.

12.2 Minimum Scope of Insurance. Unless otherwise approved by City, coverage shall be at least as broad as:
(1) Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001).
(2) Insurance Services Office form number CA 0001 (Ed.
1/87) covering Automobile Liability, code 1 (any auto). (3) Worker’s Compensation insurance as required by the State of California, and Employer’s Liability Insurance.
(4) Professional Liability insurance in a form approved by the City, having an extended reporting period of not less than three (3) years; or Professional Liability insurance shall be maintained for a period of three (3) years after completion of the Services which shall, during the entire three (3) year period, provide protection against claims of professional negligence arising out of Consultant’s performance of the Services and otherwise complying with all applicable
provisions of this Section 13. Either policy shall be
endorsed to include contractual liability to the extent insurable.

12.3 Minimum Limits of Insurance. Consultant shall maintain limits no less than:
(1) Commercial General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage.

Commercial General Liability Insurance with a general
aggregate limit shall apply separately to this Agreement or

Page 11445588 ends

PSA with Professional Liability Insurance (Non-Design) Page 9 Last Revised: 11/12/2020
the general limit shall be twice the required occurrence limit.
(2) Automobile Liability: $2,000,000 per accident for bodily injury and property damage.
(3) Employer’s Liability: $1,000,000 per accident and in the aggregate for bodily injury or disease and Workers’
Compensation Insurance in the amount required by law.
(4) Professional Liability: $1,000,000 per claim/aggregate.

12.4 Deductibles and Self-Insured Retentions. Any deductibles or selfinsured retentions must be declared to and approved by the City.

12.5 Other Insurance Provisions.
(1) The commercial general liability and automobile liability policies are to contain the following provisions on a
separate additionally insured endorsement naming the City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of city or agency officials, are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Consultant; products and completed
operations of Consultant; premises owned, occupied or
used by Consultant; and/or automobiles owned, leased,
hired or borrowed by Consultant. The coverage shall
contain no limitations on the scope of protection afforded to City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City or agency officials which are not also limitations applicable to the named insured.
(2) For any claims related to this Agreement, Consultant’s insurance coverage shall be primary insurance as respects City, its officers, officials, employees, designated
volunteers and agents serving as independent contractors in the role of city or agency officials. Any insurance or selfinsurance maintained by City, their officers, officials, employees, designated volunteers or agents serving as
independent contractors in the role of city or agency
officials shall be excess of Consultant’s insurance and shall not contribute with it.
(3) Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought,
except with respect to the limits of the insurer’s liability.

Page 11445599 ends

PSA with Professional Liability Insurance (Non-Design) Page 10 Last Revised: 11/12/2020
(4) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled except after 30 days prior written notice by first class mail has been given to City (ten (10) days prior written notice for non-payment of premium). Consultant shall provide thirty (30) days written notice to City prior to implementation of a reduction of limits or material change of insurance
coverage as specified herein.
(5) Each insurance policy, required by this clause shall expressly waive the insurer’s right of subrogation against City and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of city or agency
officials.
(6) Be issued by an insurance company approved in writing by City, which is admitted and licensed to do business in the State of California and which is rated A:VII or better
according to the most recent A.M. Best Co. Rating
Guide.
(7) Specify that any failure to comply with reporting or other provisions of the required policy, including breaches of warranty, shall not affect the coverage required to be
provided.
(8) Specify that any and all costs of adjusting and/or defending any claim against any insured, including court costs and attorneys' fees, shall be paid in addition to and shall not deplete any policy limits.
(9) Other required insurance, endorsements, or exclusions as required by the City in any request for proposals applicable to this Agreement.

12.6 Evidence of coverage.Prior to commencing performance under this Agreement, the Consultant shall furnish the City with certificates and original endorsements, or copies of each required policy, effecting and evidencing the insurance coverage required by this Agreement. The endorsements shall be signed by a person authorized by the insurer(s) to bind coverage on its behalf. All endorsements or policies shall be received and approved by the City before Consultant commences performance.

If performance of this Agreement shall extend beyond one year, Consultant shall provide City with the required policies or endorsements evidencing renewal of the required policies of insurance prior to the expiration of any required policies of insurance.

Page 11446600 ends

PSA with Professional Liability Insurance (Non-Design) Page 11 Last Revised: 11/12/2020

13. Cooperation. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation that City might require. City shall compensate Consultant for any litigation support services in an amount to be agreed upon by the parties.

14. Termination. City shall have the right to terminate this Agreement at any time for any or no reason on not less than ten (10) days prior written notice to Consultant. In the event City exercises its right to terminate this Agreement, City shall pay Consultant for any services satisfactorily rendered prior to the effective date of the termination, provided Consultant is not then in breach of this Agreement. Consultant shall have no other claim against City by reason of such termination, including any claim for compensation. City may terminate for cause following a default remaining uncured more than five (5) business days after service of a notice to cure on the breaching party.

Consultant may terminate this Agreement for cause upon giving the City ten (10) business days prior written notice for any of the following: (1) uncured breach by the City of any material term of this Agreement, including but not limited to Payment Terms; (2) material changes in the conditions under which this Agreement was entered into, coupled with the failure of the parties to reach accord on the fees and charges for any Additional Services required because of such changes.

15. Notices. Any notices, bills, invoices, or reports authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Consultant’s and City’s regular business hours; or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses set forth in this section, or to such other addresses as the parties may, from time to time, designate in writing pursuant to the provisions of this section.

All notices shall be addressed as follows:

If to City: City of Rancho Cucamonga
Attn: RCMU
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
If to Consultant: Douglas Taft, COO Power and Utility Group NV5, Inc.
15092 Avenue of Science, Suite 200
San Diego, CA 92128

16. Non-Discrimination and Equal Employment Opportunity. In the performance of this Agreement, Consultant shall not discriminate against any employee, subcontractor, or applicant for employment because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation. Consultant will take affirmative action to ensure that subcontractors and applicants are employed, and that employees are treated during

Page 11446611 ends

PSA with Professional Liability Insurance (Non-Design) Page 12 Last Revised: 11/12/2020
employment, without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation.

17. Assignment and Subcontracting. Consultant shall not assign or transfer any interest in this Agreement or subcontract the performance of any of Consultant’s obligations hereunder without City’s prior written consent. Except as provided herein, any attempt by Consultant to so assign, transfer, or subcontract any rights, duties, or obligations arising hereunder shall be null, void and of no effect. 18 Compliance with Laws. Consultant shall comply with all applicable federal, state and local laws, ordinances, codes and regulations in force at the time Consultant performs the Services.

19. Non-Waiver of Terms, Rights and Remedies. Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default.

20. Attorney’s Fees. In the event that either party to this Agreement shall commence any legal action or proceeding to enforce or interpret the provisions of this Agreement, the prevailing party in such action or proceeding shall be entitled to recover its costs of suit, including reasonable attorney’s fees and costs of experts.

21. Exhibits; Precedence. All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail.

22. Applicable Law and Venue. The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California. Venue for any action relating to this Agreement shall be in the San Bernardino County Superior Court.

23. Construction. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement.

24. Entire Agreement. This Agreement consists of this document, and any other documents, attachments and/or exhibits referenced herein and attached hereto, each of which is incorporated herein by such reference, and the same represents the entire and integrated agreement between Consultant and City. This Agreement supersedes all prior

Page 11446622 ends

PSA with Professional Liability Insurance (Non-Design) Page 13 Last Revised: 11/12/2020
oral or written negotiations, representations or agreements. This Agreement may not be amended, nor any provision or breach hereof waived, except in a writing signed by the parties which expressly refers to this Agreement.

IN WITNESS WHEREOF, the parties, through their respective authorized representatives, have executed this Agreement as of the date first written above.

Consultant Name: NV5, Inc.

By: ______________________________
Name Date
______________________________
Title
City of Rancho Cucamonga

By:________________________________
Name Date
_________________________________
Title
By: ______________________________
Name Date

______________________________
Title
City of Rancho Cucamonga

By:________________________________
Name Date
_________________________________
Title
(two signatures required if corporation)

Page 11446633 ends

PSA with Professional Liability Insurance (Non-Design) Page 14 Last Revised: 11/12/2020

EXHIBIT A

SCOPE OF SERVICES

Page 11446644 ends

CITY OF RANCHO CUCAMONGA
Mr. Chris Beeman
Deputy Director of Electric Utility Services
10500 Civic Center Drive
Rancho Cucamonga, California 91730

PROPOSAL FOR RANCHO CUCAMONGA MUNICIPAL UTILITY
VARIOUS ON-CALL SERVICES - SOQ: 25/26-501
May 14, 2026
Prepared For:

PP26826-0018364.00
15092 Avenue of Science
Suite 200
San Diego, CA 92128
858.385.0500

Page 11446655 ends

May 14, 2026
City of Rancho Cucamonga
Mr. Chris Beeman
Deputy Director of Electric Utility Services
10500 Civic Center Drive
Rancho Cucamonga, California 91730
SUBJECT: Request for Statement of Qualifications for Rancho Cucamonga Municipal Utility Various On-Call Services - SOQ: 25/26-501
Dear Mr. Beeman,
NV5, Inc. (NV5) is pleased to present this bid response to City of Rancho Cucamonga (RCMU) for Rancho Cucamonga Municipal Utility Various On-Call Services.

BEYOND ENGINEERING: NV5 has been providing engineering and consulting services for over 75 years to public and private sectors, supporting infrastructure, utility, and building assets and systems through six business verticals: Utility Services; Conformity Assessment; Environmental Health Sciences; Infrastructure Support Services; Buildings & Technology; and Geospatial.

NV5 pairs national technical depth with local delivery. Our San Diego region-based team includes licensed civil and electrical engineers, senior utility coordinators, and qualified applicant designers with direct experience supporting SDG&E, municipal utility, public agency, and campus-related infrastructure projects. This combination allows us to bring both broad technical resources and practical local knowledge to RCMU’s on-call assignments.

We provide engineering and consulting services to meet your power delivery project and maintenance needs. Our integrated team approach combines electrical engineering design, utility applicant design, proactive agency outreach, civil engineering support, and construction-phase coordination to help shorten approval cycles, reduce redesign risk, and keep projects on schedule and within budget.

For the City of Rancho Cucamonga, NV5 will provide a single point of contact supported by proven processes and tools, including utility conflict review, GIS and mapping support, early permit and agency coordination, constructability review, and transparent task authorization, budget tracking, and cost-control procedures. This approach provides RCMU with predictable timelines, fewer change orders, minimal site disruption, and practical, code-compliant solutions that advance project certainty from concept through construction.

CONTACT PERSON & AUTHORIZED INDIVIDUAL: Douglas Taft will serve as the point of contact for this SOQ response and the individual authorized to contractually bind the firm.

CONTACT INFORMATION: Jeffrey Martin, PMP, LSIT
Phone: 313.516.8076 | Email: [email protected]
15092 Avenue of Science, Suite 200,
San Diego, CA 92128
We welcome and appreciate the opportunity to provide our SOQ response to you and look forward to your evaluation of our credentials. Our goal is to have a mutually beneficial relationship that integrates us into your specific processes, standards, and strategies for a long term relationship. We hope to hear from you in the near future.

Sincerely,
NV5
15092 Avenue of Science, Suite 200 | San Diego, CA 92128 | www.NV5.com | 858.385.0500 Jeffrey Martin, PMP, LSIT
Project Manager
Douglas Taft
COO Power and Utility Group

Page 11446666 ends

TABLE OF CONTENTS
COVER LETTER....................................................................................................LETTER EXECUTIVE SUMMARY................................................................................................01 FIRM EXPERIENCE/QUALIFICATIONS.........................................................................02 THIRD-PARTY/SUBCONTRACTORS..............................................................................10 STAFF RESUMES AND ORGANIZATION CHART...........................................................11 PROJECT MANAGEMENT APPROACH..........................................................................38 NV5.COM

Page 11446677 ends

H. ADDITIONAL INFORMATION

30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.

Scope
• On‑call electrical engineering services to support the City of Rancho Cucamonga’s plans and other RCMU‑directed
projects. Services delivered as‑needed: short technical reviews to full design (concept → construction).
• Deliverables: plans, exhibits, calculations, specs,
technical memos, Civil 3D/AutoCAD files, cost estimates, and construction support. Includes roadway lighting,
utility coordination, underground facilities, power
distribution, and associated civil infrastructure.

Task Delivery & Technical Approach
• Task kickoffs to confirm objectives, standards, schedule, deliverables, risks, and staffing; focused work plan for each assignment.
• Early review of maps, record drawings, utility data, and site info to identify constraints (utility conflicts, ROW, constructability, agency requirements).
• Practical, constructible designs emphasizing
cost‑effectiveness and reduced field rework. Civil and
electrical coordination for turnkey, buildable solutions.

Project Management
• Dedicated Project Manager as single point of contact; roles defined via a Work Breakdown Structure (WBS).

Phased lifecycle (Initiation → Planning → Design/
Execution → Closeout) with gated reviews and regular
cadences (weekly design reviews, biweekly client
updates, monthly executive summaries).
• Collaboration tools: Teams is used for day‑to‑day
coordination and milestone visibility; SharePoint for
document/version control and cross‑team transparency.

Quality, Cost, Schedule Controls
• Quality Assurance/Quality Control (QA/QC): quality
checks are done by a robust QA/QC policy where
technical leads have a tracked procedure to do a final
cold‑eye review after both self‑review and manager
review. Standardized checklists, review templates, logged records, non‑conformance tracking, and senior technical sign‑offs ensure accuracy and standards compliance.
• Cost Control: Cost control is done via financial software by reporting to designers at the minimum of weekly
and utilizing SharePoint for cross‑team visibility. Weekly cost‑to‑date vs. budget reporting, rolling forecasts,
variance analysis, and a formal change‑control workflow manage budget performance and change orders.
• Schedule Control: Schedule control is set with a Gantt chart, with milestones tracked throughout the project
life cycle process via Teams for visibility for the entire team. Baseline schedules, critical‑path monitoring,
percent‑complete tracking, and recovery actions
maintain milestone adherence.

Performance Monitoring & Reporting
• Performance monitoring includes tracking KPI’s for
schedule and budget, supported by earned‑value metrics
(SPI, CPI), milestone adherence, review cycle times, and open non‑conformances.
• Reporting: concise weekly briefs to the design
team; formal monthly progress reports summarizing
schedule, cost, risk, quality, and actions. All reports and deliverables stored in SharePoint; Teams used for
notifications and meeting artifacts.

Commitment
• NV5 provides responsive, standards‑compliant,
constructible engineering support—combining
experienced technical staff, disciplined QA/QC, and
tool‑enabled visibility to reliably deliver City projects from planning through construction.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 1

EXECUTIVE SUMMARY

Page 11446688 ends

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 2

FIRM EXPERIENCE/QUALIFICATIONS

SERVICES
Overhead Transmission and
Distribution Engineering
Underground Transmission
and Distribution Design
Electrical Engineering Studies
Underground Civil Engineering
Surveying / Utility / ROW
Substation Engineering
Automation, Protection, and Controls
Renewable Energy
Energy Storage
Structural Engineering
Geotechnical Engineering
Construction Materials Testing
Stormwater Quality
Flood Control and Drainage
Permitting
Community Relations
Construction Management (CM)
and Inspection
Geographic Information Systems (GIS)
Program Management
Transportation Engineering
Water and Wastewater
Engineering
Hydrogeological
Environmental
Land Planning
Project Management
Land Services

BEYOND ENGINEERING
NV5, a California corporation since 1949, has been providing engineering and consulting services for over 75 years to public and private sectors, supporting infrastructure, utility, and building assets and systems through three business verticals: Infrastructure Support Services, Buildings and Technology, and Geospatial.

With offices nationwide and abroad, NV5 helps clients plan, design, build, test, inspect, certify, and operate projects that improve the communities where we live and work. We take pride in helping our clients and shaping our communities through the services we provide.

As engineers, inspectors, program managers, and environmental professionals, NV5 is helping our clients develop and deliver costeffective, sustainable projects. Our combined capabilities bring effective solutions to complex issues.

We provide engineering and consulting services to meet your power delivery project and maintenance needs. Our full-service engineering firm brings a team approach and solutions to every project -- we have the capabilities and resources to complete projects on-time and within budget.

NV5 has 24 offices in the state of California, with our main office being at 15092 Avenue of Science, Suite 200, San Diego, CA 92128.

Nearby offices to Rancho Cucamonga can be found in Riverside, Anaheim, and Irvine.

Page 11446699 ends

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 3

CNC ENGINEERING
Dev Birla, PE Senior Energy Manager
15625 E. Stafford, Suite 100
City of Industry, CA 91744
626.956.8044
[email protected]

FIRM EXPERIENCE/QUALIFICATIONS
NV5 provided the City of Industry with a wide range of new municipal electric utility and engineering services in support of the City’s Capital Improvement Program (CIP). A key element of the CIP was to streamline and upgrade the city’s electric utility services through the design of an underground electric distribution system.

Services provided by the NV5 dry utilities team included:
• Planning, design, and engineering services for underground electric distribution system. • Private telecommunications substructure system.
• Electric transmission circuit planning and design.
• Substation planning, mapping and records keeping.
• Construction inspection services.

Additional services included:
• Providing cost estimates and feasibility studies.
• Providing city staff functions for new customer coordination and negotiations. • Policy development.
• Establishing emergency call out procedures.

ENGINEERING, DESIGN, AND CONSULTING FOR NEW

MUNICIPAL ELECTRIC UTILITY
CITY OF INDUSTRY | INDUSTRY, CA | 2002 - PRESENT
Dry Utility Due Diligence,
Planning & Technical
Support
Infrastructure & Utilities
Master Planning
Electric Distribution
Planning & Design
Gas Distribution
Planning & Design
Telecommunications
System Planning

SERVICES
*Images Courtesy of City of Industry
Gregg Butsko
Mark Webb

TEAM MEMBERS

Page 11447700 ends

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 4

CITY OF CORONA, CA
Michael TenEyck, CDWP – Finance and
Administrative Manager
400 S. Vicentia Ave., Suite 320,
Corona, CA 92882
951.736.2234
[email protected]

FIRM EXPERIENCE/QUALIFICATIONS
NV5 provided the City of Corona with a wide range of electric utility engineering, design, and consulting services in support of the City’s Capital Improvement Program (CIP). A key element of the CIP was to streamline and upgrade electric utility services through the design of an underground electric distribution system.

Services provided by the NV5 team included:
• Planning, design, and engineering services for an underground electric distribution system.
• Substation siting.
• Mapping and records keeping.
• Construction inspection services.

Additional services included:
• Providing cost estimates and feasibility studies.
• Assisting city staff with developer negotiations.
• Policy development.
• Tariff development.

ENGINEERING, DESIGN, AND CONSULTING SERVICES
CITY OF CORONA | CORONA, CA | 2002 - PRESENT Dry Utility Due Diligence, Planning & Technical
Support
Infrastructure & Utilities
Master Planning
Electric Distribution
Planning & Design
Gas Distribution
Planning & Design
Telecommunications
System Planning

SERVICES
*Images Courtesy of City of Corona
Gregg Butsko
Mark Webb

TEAM MEMBERS

Page 11447711 ends

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 5

RANCHO CUCAMONGA MUNICIPAL

UTILITY
Fred Lyn, Deputy Director of Engineering
Services-Utilities
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
909.774.4035
[email protected]

FIRM EXPERIENCE/QUALIFICATIONS
NV5 provided dry utility services on a major project undertaken by the City of Rancho Cucamonga to upgrade and streamline electric utility services provided by a municipal electric utility owned by the City. The electric utility, Rancho Cucamonga Municipal Utility (RCMU), provides electric utility services to 1,100 Rancho Cucamonga residents and businesses within its service area. RCMU owns one (1) 66/12kV electrical substation in the City. Inside the substation are two (2) banked 66-12kV power transformers that serve five (5) 12kV distribution circuits that are routed at various locations within RCMU’s service area.

Services provided by the NV5 dry utilities team include:
• Planning, design, and engineering services for underground electric distribution system. • Electric transmission circuit planning and design.
• Substation planning, mapping and records keeping.
• Construction inspection services.

Additional services include:
• Providing cost estimates and feasibility studies.
• Providing city staff functions for new customer coordination and negotiations. • Policy development.
• Tariff development.
• Establishing emergency call out procedures.
• On-call technical design and coordination services.

ENGINEERING, DESIGN, AND CONSULTING FOR NEW

MUNICIPAL ELECTRIC UTILITY
CITY OF RANCHO CUCAMONGA | RANCHO CUCAMONGA, CA | 2002 - PRESENT Dry Utility Due Diligence,
Planning & Technical
Support
Infrastructure & Utilities
Master Planning
Electric Distribution
Planning & Design
Gas Distribution
Planning & Design
Telecommunications
System Planning

SERVICES
*Images Courtesy of City of Rancho Cucamonga
Gregg Butsko
Mark Webb

TEAM MEMBERS

Page 11447722 ends

PARSONS
Matt Brash, Area Manager
525 B Street, Suite 1600,
San Diego, CA 92101
619.515.5160
[email protected]
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 6

FIRM EXPERIENCE/QUALIFICATIONS
A long-range specific plan developed over several years by the City of San Marcos called for the development of a comprehensive 214-acre “downtown” area that the City refers to as the San Marcos Creek District. The complex plan involved several phases before completion.

NV5 was enlisted to provide dry utility services for Phase 1, a $104M project that involved the development of infrastructure to support the overall plan.

Phase 1 consisted of the following elements:
• Widening of Discovery Street to four lanes and a bike lane. • Raised roadway and new bridges over the San Marcos Creek to reduce flooding and enhance safety.
• Additional sidewalks and bike facilities.
• New community park.
• Restoration and preservation of 1.5 miles of creek habitat.

NV5’s dry utilities team did the following: provided site analysis, reviewed franchise utilities, conducted initial meetings with the dry utility companies, created and reviewed with the City of San Marcos a concept utility exhibit to identify the existing utility company-related systems located in the area, and the potential new underground and overhead utility systems planned for the new project, and developed a cost estimate summary report with written findings and recommendations for each utility company (SDG&E, AT&T and Cox Communications).

In addition, NV5 created and finalized the SDG&E Applicant Design for the electric overhead and underground poleline conversion. NV5 provided the coordination and management with each dry utility for the final utility design, agreements, and construction coordination for the scheduling, installation and energizing of the project.

DISCOVERY STREET IMPROVEMENTS & POLELINE

CONVERSION
CITY OF SAN MARCOS | SAN MARCOS, CA | 2012 - 2022
Dry Utility Due Diligence,
Planning & Technical
Support
Infrastructure & Utilities
Master Planning
Electric Distribution
Planning & Design
Gas Distribution
Planning & Design
Telecommunications
System Planning

SERVICES
*Images Courtesy of City of San Marcos
Gregg Butsko
Mark Webb

TEAM MEMBERS

Page 11447733 ends

MICHAEL BAKER INTERNATIONAL
Tim Thiele - Area Manager
5050 Avenida Encinas
Carlsbad , CA 92008
858.875.1704
[email protected]
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 7

FIRM EXPERIENCE/QUALIFICATIONS
The City of Encinitas developed this infrastructure project to change the circulation in southern Encinitas throughout Cardiff-by-the-Sea to the benefit of the community. It included the design and construction of a new sidewalk on both sides of Birmingham Drive from Carol View Road to San Elijo Avenue, a distance of approximately 2,500 linear feet.

These improvements also included undergrounding of utilities on Birmingham Drive over the length of the project to improve accessibility for pedestrians and for overall project aesthetics.

NV5’s team was brought on board to provide the required extensive coordination and management with the utilities involved in the Birmingham Drive Widening project improvements: SDG&E, AT&T, and CATV. The services included dry utility due diligence, forward planning, cost estimating, dry utility composite exhibits, and coordination of the final dry utility designs and contracts.

In addition, NV5 provided the SDG&E Applicant Design for the electric and gas project improvements.

BIRMINGHAM DRIVE IMPROVEMENTS & POLELINE

CONVERSION
CITY OF ENCINITAS | ENCINITAS, CA | 2017 - 2020
Dry Utility Due Diligence,
Planning & Technical
Support
Infrastructure & Utilities
Master Planning
Electric Distribution
Planning & Design
Gas Distribution
Planning & Design
Telecommunications
System Planning

SERVICES
*Images Courtesy of City of Encinitas
Gregg Butsko
Mark Webb

TEAM MEMBERS

Page 11447744 ends

GENSLER
Nathan Ouren, SWR DM Co-Leader,
Studio Director, Project Director,
Sr. Associate
225 Broadway, Suite 100
San Diego, CA 92101
619.557.2500
[email protected]
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 8

FIRM EXPERIENCE/QUALIFICATIONS
NV5 is part of an elite design-build team selected for a $2.7 billion project to redevelop and expand Terminal 1 at the San Diego International Airport to improve the passengers’ airport experience and meet the airport’s growing demands. The project also involves redesigned roadways, a new parking garage, 11 additional gates, increased airport restaurants and shops, and energy efficiency upgrades. The overall project includes a Fixed Base Operator and the widening of Harbor Drive.

NV5’s role is to provide dry utility planning and design for the Arrive – San Diego Aviation Alliance, which consists of a Turner-Flatiron Joint Venture for construction and Gensler for design. The Terminal 1 Expansion also includes a new parking structure, street improvements to North Harbor Drive, EV Charging Stations, and other off-site mitigation improvements.

Our initial work involved dry utility planning and technical support, site analysis, a concept exhibit, preliminary cost estimation, and the creation of a summary of findings. NV5 also provided coordination with the utilities (SDG&E, Telco, and CATV) for the removal/ relocations and new line extensions. NV5 prepared and created the SDG&E gas and electric Applicant Designs for the removal/relocations and new line extensions to serve the project improvements.

SAN DIEGO INTERNATIONAL AIRPORT - TERMINAL 1

REDEVELOPMENT & EXPANSION
ARRIVE - SAN DIEGO AVIATION ALLIANCE | SAN DIEGO, CA | 2021 - PRESENT Dry Utility Due Diligence,
Planning & Technical
Support
Infrastructure & Utilities
Master Planning
Electric Distribution
Planning & Design
Gas Distribution
Planning & Design
Telecommunications
System Planning

SERVICES
*Images Courtesy of San Diego Aviation Alliance
Gregg Butsko
Mark Webb

TEAM MEMBERS

Page 11447755 ends

SAN DIEGO STATE UNIVERSITY
Paul Jackson, Program Manager -
West Campus
5500 Campanile Drive
San Diego, CA 92182
P: 619.594.9650
C: 858.886.6883
[email protected]
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 9

FIRM EXPERIENCE/QUALIFICATIONS
Snapdragon, San Diego’s new sports stadium and home of the San Diego State University Aztecs football team, opened on time and on budget in August 2022 due to the hard work and diligence of the entire design-build team. NV5, which provided dry utilities’ consultant services for electric, natural gas, and telecommunications infrastructure and design, made critical contributions to keep this complex project on schedule. At project start in August 2020, our engineers developed a design that was quickly approved by SDG&E to maintain utility service at the old stadium while the team was building and transitioning into a new stadium at SDSU’s satellite campus in Mission Valley.

As the project progressed, other problems cropped up due to the global Covid-19 pandemic that not only impacted the productivity of the designers and builders but also caused global supply chain problems. One of the most critical areas of concern involved the timing of the installation of equipment required to provide the stadium with permanent power.

By working together, the team found a solution enabling all designs (electric, gas, and telecommunications) to be approved and installed as planned, keeping the project on its critical path schedule. Jim Cleaton, SDSU Director of Construction, thanked the team, saying, “I appreciate your diligence to work through the obstacles to make this happen. Good job!” Snapdragon is a 35,000-seat stadium with the capability to be expandable to 55,000 seats.

It was built to support not only SDSU Aztecs football, but also to support professional soccer, rugby, lacrosse, and special events such as concerts.Snapdragon Stadium, which is one of the most significant projects for the San Diego community in recent years, is the first phase of a 135-acre SDSU Mission Valley Redevelopment project that is transforming the former SDCCU stadium site into a new SDSU satellite campus and community. NV5 is also the dry utilities consultant for phase 2, which is estimated to be a $3.5 billion endeavor.

SNAPDRAGON STADIUM
SAN DIEGO STATE UNIVERSITY - MISSION VALLEY CAMPUS | SAN DIEGO, CA | 2019 - 2022 Electric Distribution Infrastructure Design
Natural Gas Distribution
Infrastructure Design
Telecommunications
System Infrastructure
Design

SERVICES
AWARDS
2023 ENR California Best Project Award
(Sports/Entertainment)
2023 CMAA National Award
(Commercial / Sports / Entertainment /
Hospitality
2023 AGC Build San Diego Award
(Unique Special Project)
2023 LEED Gold Certification
for Sustainable Development
*Photos Courtesy of San Diego State University
Gregg Butsko
Mark Webb

TEAM MEMBERS

Page 11447766 ends

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 10 NV5 understands the importance of a well established team and commitment to excellence to all of our clients. For this contract NV5 has all of the capabilities in-house to support your project goals, therefore we determined that there is no need to use the services of third-party / subcontractors for this contract. Should the scope of work expand, we have access to a large database of qualified local third-party / subcontractors that we can access to support RCMU. NV5 has put together the best team possible for your project and each team member was chosen specifically for their expertise in the fields required to successfully complete your project.

THIRD-PARTY / SUBCONTRACTORS

Page 11447777 ends

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 11

ORGANIZATION CHART
The NV5 team has the experience and knowledge of the City of Rancho Cucamonga and brings expertise to support and complete the necessary tasks for this project.

The organization chart, pictured below, illustrates our project team members’ roles and responsibilities.

RESUMES
Resumes demonstrating individual qualifications of the
professionals identified for this project are on the following pages.

STAFF RESUMES AND ORGANIZATION CHART
City of
Rancho Cucamonga
Jeff Martin, PMP, LSIT

PROJECT MANAGER
Leslie Ragan, PE, QSD
Mark Webb, PE
Jon Rowland, PE, LEED AP
Yezid Fuentes

CIVIL ENGINEERING
DESIGN
Robert Richardson

PRINCIPAL-IN-CHARGE
Roxanne Reyes
Candice Holley, PMP
Martin Jaimes
Louis Canonico

UNDERGROUND ENGINEERING
DESIGN
Godefroy Devys, PE
Krista Miguel
Cliff Howell
Nick Weary
Jim Pasquan

OVERHEAD ENGINEERING
DESIGN
*Bold - Team Lead
Luanne Bean, MS, PE

CONSTRUCTION MANAGEMENT
John Oates

CONSTRUCTION INSPECTION

Page 11447788 ends

Robert is a seasoned utility design professional with over 20 years of experience in electric powerline construction, engineering, and project management with a proven ability to deliver high-quality, compliant, and cost-effective solutions for overhead and underground transmission and distribution systems. He is known for ethical leadership, strong utility relationships, and a passion for mentoring the next generation of designers and brings a unique three-point perspective to every project-design, engineering, and construction-to ensure constructible, efficient outcomes.

Robert is experienced in Electric Utility Design (OH/UG), PLS-CADD / PLS-POLE / O-Calc Modeling, SDG&E Standards & GO 95/128 Compliance, Project Cost Estimation & Proposal Development, Constructability & QA/QC Review, AutoCAD & iCUE / PMWORKS Proficiency, and Transmission Rebuilds & Distribution Underbuilds. He has lead end-to-end project delivery for new construction, reconductoring, system upgrades, and relocations (OH/UG) in full compliance with regulatory and utility standards as well as designed OH/UG distribution systems for SDG&E territory including new builds, reroutes, and reconductors.

Project Experience

CLEVELAND NATIONAL FOREST MASTER SPECIAL USE PERMIT PROGRAM (MSUP)
SAN DIEGO GAS & ELECTRIC | SAN DIEGO COUNTY, CA
Project Manager and Senior Designer - This multi-year initiative supports SDG&E’s Cleveland National Forest Master Special Use Permit (MSUP) program, aimed at modernizing existing transmission and distribution infrastructure within environmentally sensitive areas. The program involves replacing legacy wood poles with steel structures to improve reliability, wildfire resiliency, and long-term maintainability while minimizing environmental disturbance. The Scope of Work included:
• Provided distribution design services for both transmission underbuild and stand-alone distribution wood-to-steel rebuild projects. • Supported (5) 69 kV circuits as well as (2) 12 kV circuits, ensuring full alignment between transmission and distribution design elements. • Produced complete distribution design packages in coordination with transmission work orders, promoting compatibility across disciplines and seamless integration during construction.
• Collaborated closely with the Cleveland National Forest project team, environmental specialists, and utility engineering groups to ensure compliance with all permitting, environmental, and design requirements. • Delivered construction-ready design documents that balanced system reliability, wildfire hardening, and constructability within constrained terrain and environmental conditions.

ROBERT P. RICHARDSON IV
Principal-in-Charge

EXPERIENCE
21 years (1 with NV5)

REGISTRATIONS
Qualified SDG&E Applicant
Designer – Overhead &
Underground
Shielded Metal Arc Welding
(SMAW) Welding Certificate – 1”
to Unlimited

EDUCATION
AS, Drafting Technology,
Palomar College
AA, General Education,
Palomar College, 1998
Velociteach, PMP Boot Camp,
2012
PLS-CADD & PLS-POLE Training,
2010
Power Lineman Apprenticeship
Program,
California-Nevada Joint
Apprenticeship Training
Committee, 2008

SOFTWARE

PLS-CADD

PLS-POLE
O-Calc
AutoCAD
iCUE

PMWORKS
SolidWorks
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 12

STAFF RESUMES AND ORGANIZATION CHART

Page 11447799 ends

Project Experience Continued

DRONE INVESTIGATION, ASSESSMENT & REPAIR PROGRAM
(DIAR) TIER 3
SAN DIEGO GAS & ELECTRIC | SAN DIEGO COUNTY, CA
Project Manager and Senior Design Engineer - This project involved converting an existing open-wire overhead electric distribution system to a new covered conductor system rebuilt on steel poles. In addition to the design for this overhead rebuild, contributed to the development of the construction standards, material testing, and allowable configurations for the new components. The Scope of Work included:
• Developed the initial pilot designs for DIAR Tier 3 facilities, creating engineering solutions based on drone inspection data and wildfire mitigation standards.
• Focused on producing simplified design packages scaled to project complexity, balancing the need for sufficient construction documentation with streamlined engineering for proposed work.
• Delivered construction packages that satisfied safety and compliance requirements while avoiding excessive
engineering scope during the initial design phase.
• After pilot completion, served as Owner’s Engineer by reviewing contractor-submitted designs for accuracy,
compliance with SDG&E standards, and regulatory
requirements.
• Emphasized comprehensive engineering during the Trueup (as-built) phase, ensuring that final documentation accurately reflected field conditions and identified any further remediation needed due to construction deviations or site constraints.
• Worked collaboratively with SDG&E, PMO and program
contractors to establish and achieve a 30-day turnaround goal for critical designs, maintaining aggressive project schedules without compromising safety or compliance.
12 KV, C182 CITRICADO PARKWAY EXTENSION – NEW

UNDERGROUND SYSTEM
SAN DIEGO GAS & ELECTRIC | ESCONDIDO, CA | 2019 - 2021
Senior Project Manager and Design QA/QC - Responsible for coordinating the undergrounding and relocation designs and provided internal QA/QC for accuracy and constructability. This project involved converting an existing overhead electric distribution system to an underground system in conjunction with the City of Escondido’s road improvement plans.
12 KV, C182 CITRICADO PARKWAY EXTENSION – NEW

UNDERGROUND SYSTEM
SAN DIEGO GAS & ELECTRIC | ESCONDIDO, CA | 2019 - 2021
Senior Project Manager and Design QA/QC - Responsible for coordinating the undergrounding and relocation designs and provided internal QA/QC for accuracy and constructability. This project involved converting an existing overhead electric distribution system to an underground system in conjunction with the City of Escondido’s road improvement plans.
12 KV, WOODCREST JAMUL 20B CONVERSION
SAN DIEGO GAS & ELECTRIC | JAMUL, CA | 2019 - 2020
Senior Project Manager and Internal QA/QC Reviewer Responsible for coordinating the undergrounding design. This project involved converting an existing overhead electric distribution system to underground electric to accommodate the customer’s project needs.

12.47 KV, ESH C1215 SUG
SAN DIEGO GAS & ELECTRIC | CRESTWOOD, CA | 2023 - 2024
Internal QA/QC Reviewer - Responsible for performing internal 3rd party review of the underground conversion designs and construction drawings to ensure compliance with SDG&E
design and drafting requirements. The project includes
converting existing overhead electric distribution system to underground electric to meet SDG&E’s undergrounding
initiative in CPUC’s Tier 3 areas.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 13

STAFF RESUMES AND ORGANIZATION CHART

Page 11448800 ends

JEFFREY MARTIN, PMP, LSIT
Project Manager

EXPERIENCE
28 years (6 with NV5)

REGISTRATIONS
Project Management Professional
(PMP) #2644146
Land Surveyor-In-Training,
CA #8105
MARC Training

EDUCATION
BS, Psychology, Mechanical
Engineering, and Computer
Science,
University of Michigan

PRESENTATIONS
“Day of Understanding,” SDG&E
company-wide meeting,
San Diego, CA, 2018
Jeffrey has worked on a wide range of surveying, civil and mechanical engineering projects as a consultant in Southern California and the Midwest.

He has 28 years of engineering experience ranging from mechanical engineering design work, survey data and field work, civil engineering design work and extensive natural gas design. Natural gas design work includes design, analysis, maintenance, repair, and improvement of transmission and distribution gas utility systems, including regulator stations, large residential projects, directional drilling and underwater coverage mitigation efforts.

He has led a survey team in boundary surveys, topographic mapping, construction staking and post-processing efforts. Civil engineering design includes total site layout and design, utilizing cut/fill quantities, hydrology, grading, storm drain and sewer layout and invert elevations and water and reclaimed water layout. Mechanical engineering design included HVAC layouts, reflective ceiling plans, mechanical schedules and details, basic piping layouts, sprinkler systems and heat load calculations for small-scale commercial buildings.

Jeffrey utilizes industry-leading software tools like AutoCAD Civil 3D to provide the highest levels of accuracy and thoroughness for natural gas designs. While working for San Diego Gas & Electric, Jeffrey performed natural gas design work includes design, analysis, maintenance, repair, and improvement of transmission and distribution gas utility systems, including regulator stations, large residential projects, directional drilling and underwater coverage mitigation efforts.

Project Experience
RISK ASSESSMENT AND MITIGATION PHASE PROGRAM (RAMP) 2020 SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Design Manager - Leading the design team for the successful implementation of the Risk Assessment and Mitigation Phase Program for 2020. Led the design efforts including adherence to company standards and design standards.

Produced full drawing sets, job costing and material selection. The RAMP Program is an effort to bring older pipeline features such as oil drips, dresser couplings and valves into compliance.

DISTRIBUTION INTEGRITY MANAGEMENT PLAN (DIMP) – NATIONAL AVENUE SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
SDG&E Project Manager - Large-scale distribution replacement project in Barrio Logan. Tasks included full fielding of residential areas, design, environmental and permitting.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 14

STAFF RESUMES AND ORGANIZATION CHART

Page 11448811 ends

Project Experience Continued

DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM (DIMP)
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Design Supervisor and Project Manager - Engineering design services to design the replacement of over 20,000 linear feet of poly main with services in various locations throughout San Diego County, CA. This includes coordination with permitting and field engineering teams for correct placement of main, along with proposed location of household meter sets in viable locations. This extended to an increase in scope the following year, resulting in 50,000 linear feet of main and over 800 services. As a result of the success of NV5 meeting the client’s timeline, budget and quality standards, we have recently been awarded additional sites for the year with more than 45,000 linear feet of main and over 960 services.

SOUTHERN CALIFORNIA MISC. AS-BUILT PROJECTS

SOUTHERN CALIFORNIA GAS COMPANY/ SAN DIEGO GAS & ELECTRIC | SOUTHERN, CA
Project Manager, Design Manager, and QA/QC - Completion of as-built drawings for various projects throughout the greater Los Angeles and San Diego areas. Project scope included coordinating of in-house survey team, coordination of project deliverables to the client, as well as full as-built drawing set utilizing Southern California Gas standards and incorporating Plant3D design.

LINE 1600 SUPPORT PROGRAM
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Design Manager - Projects supporting SDG&E’s replacement of Line 1600. Provided project management, full design, and completion drawings for the replacement of seven projects in various locations throughout San Diego County.

RISER REPLACEMENT PROGRAM
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Project Manager and Design Supervisor - Engineering design services to evaluate and design the replacement of over 200 stranded steel service risers in various locations throughout San Diego County.

EXCESS FLOW VALVE (EFV) PROGRAM
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Project Manager and Design Supervisor - Addition of
approximately 50 excess flow valves to natural gas services in the San Diego County area.

CATHODIC PROTECTION PROGRAM
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
SDG&E Project Manager - Over 30 cathodic protection
stations in the San Diego County area. Responsible for full fielding of sites, determining cathodic bed location and taking into consideration drill rig setup and electric secondary requirements. Processed permits, provided full design, field and construction coordination and full construction cost responsibilities.

MISCELLANEOUS GAS DISTRIBUTION CONFLICT CHECKS,

AND CONSTRUCTION SUPPORT
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Project Manager - Reviewed plans and designs submitted from municipalities and developers to determine if improvements conflict with SDG&E gas and electric facilities, prompting negations, design changes or relocations.

RIO ESTRELLA HORIZONTAL DIRECTIONAL DRILL
SAN DIEGO GAS & ELECTRIC | BONSALL, CA
Project Manager - Full design and project management of a directional drill under Caltrans right-of-way SR-76 and insertion of distribution polyethylene pipe through a bridge casing.

REGULATOR STATION 1536 & 1537 HANCOCK/SPORTS

ARENA BLVD
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
SDG&E Project Manager - High profile regulator station
removal on Sports Arena Blvd, which had public outreach to the assisted living facility that the easement was located on.

REGULATOR STATION 1541 & 1542 - EAST VALLEY PARKWAY
SAN DIEGO GAS & ELECTRIC | ESCONDIDO, CA
Project Manager - SDG&E renewal project of an aging
regulator station, with multiple above and below ground structures deemed environmentally hazardous adjacent to the child watch building on a community college campus.

UTC – LA JOLLA/UCSD SYSTEM IMPROVEMENT
SAN DIEGO GAS & ELECTRIC | LA JOLLA, CA
Project Manager - Oversaw the conceptual plan, design
and costing and construction of this project to improve the infrastructure for the UTC and UCSD service areas, while maintaining a tight project schedule for the Mid-Coast
Corridor trolley expansion project.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 15

STAFF RESUMES AND ORGANIZATION CHART

Page 11448822 ends

Project Experience Continued

JULIET TRAINING AREA CAMP PENDLETON PIPELINE

COVERAGE MITIGATION
SAN DIEGO GAS & ELECTRIC | CAMP PENDLETON, CA
Project Manager - SDG&E project dealing with an onbase training site involving the analysis of pipe coverage required for high pressure natural gas main in regards
to large all- terrain vehicles with large weight loads in a naturalized wildlife reserve area and following all necessary environmental constraints on a Marine Corps base.

SAN DIEGO BAY LEAKAGE SURVEY
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Project Lead - Project management and assessment of two underwater high-pressure gas lines that traverse the San Diego Bay, connecting the island of Coronado with the
mainland.

YOCHA DEHE WINTUN GAS SYSTEM
YOCHA DEHE WINTUN NATION | BROOKS, CA
Design Supervisor - Engineering design services to evaluate and design a suitable solution to support and serve the future demands for the Cache Creek Casino Resort.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 16

STAFF RESUMES AND ORGANIZATION CHART

Page 11448833 ends

Leslie is a licensed professional civil engineer in California with 30 years of experience & expertise in roadway geometry, stormwater drainage, utility coordination and design, transportation, and traffic engineering. He’s proficient in all aspects of project management, including proposal development, project plan production, interdisciplinary team collaboration, RFP reviews, agency liaison, quality control, and project completion follow through and construction support QA/QC, interdisciplinary team collaboration, and agency liaison.

Leslie is a persistently optimistic leader with a responsive, active-listening management style, and has demonstrated success in providing on-time, inbudget deliverables. He brings the client technical value by optimizing design efficiencies through strategic, cross-platform integrations of ProjectWise, MicroStation, OpenRoads, InRoads, AutoCAD and Civil 3D design tools, as well as virtual team collaboration tools and has published in pedestrian street design, and is an ISI Envision sustainability champion.

Project Experience

NOAA FCORS
NATIONAL OCEANIC AND AIRSPACE ADMINISTRATION | USA
Construction Manager / Senior Civil Engineer - National Oceanic and Airspace Administration (NOAA), foundation for continuous observation and recording station (FCORS), 29 sites across USA. Helped to select the sites, designed the foundation, and managed construction foundations for two sites in Virginia and one site in Maryland. The project is expected to be completed in 2029.

SANDPIPER BATTERY ENERGY STORAGE SYSTEM (BESS)
AREVON | SAN CLEMENTE, CA
Senior Project Manager - Project entails building of a 200MW BESS facility in within the City of San Clemente. Responsible for site-civil design oversight, overall project coordination between sub-disciplines, budgeting, invoicing and scheduling of NV5 work. In addition to direct design oversight of grading, drainage, access and retaining wall design, site included geotechnical, survey, environmental, and structural components.

SYCAMORE DRIVE STREET IMPROVEMENTS
CITY OF SAN MARCOS | SAN MARCOS, CA
Senior Project Manager - Project entailed pavement rehabilitation and overflow parking lot upgrades, including conversion of a gravel parking area to asphalt pavement. Survey and staff engineer oversight, drainage design (SWQMP, SWPPP), Basis of Design documentation, submittals, agency liaison, budget/ scheduling/invoicing, and client care.

LESLIE RAGAN, PE, QSD
Civil Engineering Design Lead

EXPERIENCE
30 years (2 with NV5)

REGISTRATIONS
Registered Professional
Engineer, Civil: CA #89757, OR
#105186PE, WA #24028155
CA-SWRCB SWPPP QSD #89757

EDUCATION
MS, Urban and Regional
Planning,
University of Colorado
BA, Interdisciplinary Major,
Grinnell College

AFFILIATIONS
Institute for Sustainable
Infrastructure (ISI)
American Society of Civil
Engineers (ASCE)

SOFTWARE
OpenRoads Designer
MicroStation/InRoads
AutoCAD Civil 3D
ProjectWise
BlueBeam
MS Project
SWMM
Synchro
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 17

STAFF RESUMES AND ORGANIZATION CHART

Page 11448844 ends

Project Experience Continued

HELIX AND POWAY WATER DISTRICTS
CITY OF POWAY | POWAY, CA
Senior Project Manager - Project entailed design of new municipal water service, including pump house, reservoir tank, and associated paving/parking. Leslie’s role is engineer of record for stormwater drainage component, responsible for SWQMP, SWPPP, drainage design, and design collaboration with prime.

SHORELINE DRIVE REALIGNMENT PROJECT
CITY OF LONG BEACH | LONG BEACH, CA
Assistant Project Manager, Design Lead - Project entailed realignment of southern terminus of I-710 into Downtown Long Beach at Shoreline Drive. Leslie was technical lead for all CAD based design work; All design work completed in MicroStation and InRoads.

Responsible for design team leadership of roadway
restoration, sidewalk and striping Plans, Specifications, and Estimate (PS&E) deliverables for two dozen impacted city blocks, data consolidation of survey, utilities, traffic studies, hydrology, and earthwork designs of entire project, as well as sub-consultant coordination and oversight of cross-platform digital delivery.

PIER B FACILITY INFRASTRUCTURE
PORT OF LONG BEACH | LONG BEACH, CA
Senior Rail Designer - The project included a phased design of an ocean-pier rail yard including substantial track expansion, surface transport interface, drainage retrofitting, and utilities coordination. Leslie was technical lead for all CAD based design work; All design work completed in MicroStation and InRoads. Provided extensive utility coordination, project coordination for exhibits and assembly of comprehensive Alternatives Analysis Report. Served as the project manager for development of Port of Long Beach Standard Railroad Plans. Responsible for development of rail alignment
alternatives, as well as utilities and private property impacts research, database management, and technical exhibits
development.

ARTESIA GREAT BOULEVARD COMPLETE STREETS PROJECT
CITY OF LONG BEACH | LONG BEACH, CA
Project Manager, Design Lead - The project addressed
ongoing vehicular congestion issues as well as improved bicycle, pedestrian, and transit elements through a complete street upgrade of 1.2 miles of an urban arterial boulevard.

Responsible for design team coordination and delivery
of roadway restoration, sidewalk and striping plans, ADA compliance, utilities coordination, and digital design deliveries.

NORTH CITY PURE WATER FACILITY AND WATER

RECLAMATION PLANT EXPANSIONS
CITY OF SAN DIEGO | SAN DIEGO, CA
Senior Project Engineer - Project entailed civil component of wastewater treatment plant expansion on 34-acre site. Leslie was technical lead for all CAD based design work; All design work completed in MicroStation and InRoads. Served as
Senior Project Engineer for roadway, grading and drainage, ADA compliant design, CAD supervision, drainage study
calculations, and design liaison with prime.

LAWA AUTOMATED PEOPLE MOVER
LOS ANGELES WORLD AIRPORTS | LOS ANGELES, CA
Drainage Task Project Manager - Project entailed development of the automated people mover, which will connect three onairport stations to local rail and transit services; a consolidated Rent-a-Car center; two intermodal transportation facilities; and roadway improvements. Served as Drainage Task Project Manager for West Intermodal Transfer Facility and Century Boulevard Roadway Improvement design packages, including evaluation and preparation of the hydraulics & hydrology reports, LID design, and support coordination for various public and private roadway segments within the project
footprint. Attended team meetings, supervised technical staff, and oversaw development of segment plan sets.

I-15 EXPRESS LANES - SOUTHERN EXTENSION
RIVERSIDE COUNTY TRANSPORTATION COMMISSION; CALTRANS |

RIVERSIDE, CA
Project Manager - Project entailed completion of Project Approval / Environmental Document (PA/ED) phase for 16
miles of the I-15 Express Lanes Project - Southern Extension, providing design for widening the existing I-15 to construct two tolled express lanes in each direction. Responsible for hydraulics & hydrology studies, drainage design, studies and reports, utility investigations, and other tasks. Provided oversight of stormwater drainage design; project manager supervision of technical staff to complete multiple scope deliverables, hydraulics & hydrology analysis, plan set and report deliverables; team coordination to analyze over 300 watershed subareas; CAD oversight; client meetings; and other relevant project management tasks.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 18

STAFF RESUMES AND ORGANIZATION CHART

Page 11448855 ends

Project Experience Continued

CALTRANS CONCRETE SLAB AND ASPHALT CONCRETE

REPLACEMENT AT VARIOUS LOCATIONS
CALTRANS DISTRICT 12 | CALIFORNIA
Project Manager - Project entailed rehabilitation of existing pavement on 19 interstate freeway connectors between I-5, I-405, SR 55, etc. Provided project management oversight of technical staff to complete utility and right of way coordination and Caltrans certification, including monthly Project Development Team (PDT) meetings, site visits, Contact and Conflict Matrix development in accordance with Caltrans Project Development Procedure Manual (PDPM) manual, and development of utilities base file in Microstation.

PROPERTY PLANNING & DEVELOPMENT
VARIOUS PRIVATE CLIENTS | VARIOUS LOCATIONS
Senior Project Manager - Projects entailed Lot Line
Adjustments, Lot Mergers & Splits, and other property related ministerial actions: duties included project management, lot configuration design, staff engineer oversight, agency applications & submittals, and client care/invoicing.

SHERMAN INDIAN HIGH SCHOOL
IDS-A|B.I.A. | RIVERSIDE, CA
Senior Project Manager - Sewer facilities retrofit/upgrade design of 10K LF pipe, 51 manholes, pump station, including aerial and ground survey team oversight.

ENGINEERING DESIGN ORGANIZATION (EDO)
GHD | IRVINE CA
Transportation Team Lead - Direct line manager for over 40 junior and mid-level EIT and PE level civil engineers in GHD’s Engineering Design Organization (EDO). Responsible for Regional team building, hiring, terminations, and
implementation of corrective actions, oversight of technical development and training, and collaboration with other
discipline team leads. Responsible to integration of
Transportation EDO with Project Manager Business groups to achieve regional KPIs. Achieve quality-of-delivery metrics, monitor team performance through review of monthly
KPI reports regarding UT, revenue, and team retention
goals. Facilitate and monitor the implementation of staff performance appraisals and outcomes. Generate specific, measurable, attainable, relevant and timely initiatives for staff mentorship, technology training, quality assurance and quality control protocols.

AVENUE 64 COMPLETE STREETS PROJECT
CITY OF PASADENA | PASADENA, CA
Deputy Senior Project Manager - The project entailed design of roundabout and other complete street traffic calming, bicycle, and pedestrian enhancements for residential area. Oversaw design team, including roadway geometry and storm drainage, client coordination, subconsultant coordination.

CITY OF LONG BEACH ON-CALL ENGINEERING

SERVICES
CITY OF LONG BEACH | LONG BEACH, CA
Senior Project Manager - Responsible for project management and transportation engineering oversight of design team for delivery of roadway restoration plans, including pavement replacement, signing, striping, bikeway additions, drainage and utility coordination and design, and subcontractor
management for three “complete streets” projects: Anaheim Street, Willow Street, and Artesia Boulevard.

NOHL RANCH OPEN SPACE TRAIL PROJECT
CITY OF ANAHEIM | ANAHEIM, CA
Senior Project Manager - The project entailed a 1.2-milelong, 10-foot-wide Class I paved bikeway and a 0.75-milelong, 10-foot-wide decomposed granite multi-use trail, including fencing, directional signage, a signalized roadway crossing, and secure bicycle parking. Responsible for project management and engineering design oversight of design
team, budgets, scheduling, invoicing, and Quality Assurance / Quality Control (QA/QC).

STATE ROUTE (SR) 107
CALTRANS DISTRICT 7; CITY OF ANAHEIM | ANAHEIM, CA
Senior Project Manager - The project entailed numerous
Americans with Disabilities Act (ADA) ramp replacements along an urban highway corridor. Sub to TranSystems.

Responsible for oversight of Caltrans utility plans, testhole coordination, plan delivery.

DEVELOPER PLAN CHECK SERVICES
VARIOUS CLIENTS: OCPW | CITY OF SEAL BEACH | CITY OF BUENA PARK
Senior Project Manager - Provided developer plan check
services for several municipalities. Project management and plan check staff oversight of design team for review of developer site, grading and drainage plans. 2020 to present.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 19

STAFF RESUMES AND ORGANIZATION CHART

Page 11448866 ends

MARK WEBB, PE
Civil Engineering Design

EXPERIENCE
38 years (14 with NV5)

REGISTRATIONS
Registered Professional Engineer,
Civil: CA #46328, CO #61352,
NV #32616, OR #105295PE

EDUCATION
BS, Civil Engineering,
San Jose State University
AS, Engineering,
Cabrillo College

AFFILIATIONS
American Society of Civil
Engineers (ASCE)
Construction Management
Association of American (CMAA)
American Public Works
Association (APWA)

SOFTWARE
AutoDesk Suite of products- Civil
3D, AutoCAD Map, Navisworks,
Infraworks, Inventor, etc
Bentley -MicroStation, InRoads,
OpenRoads
Haestad Products- Flowmaster,
Pondpack, Storm-CAD, etc

HEC-RAS, HEC-HMS, HEC-DDE,

EPA-NET
BlueBeam, Adobe Acrobat
Pull-Planer
Risa 3D, Sap 2000, Retaining
Wall Pro, Hilti Base Plate Designer
Arc-GIS, Arc-Scene, QGIS, Map
Window, SewerCAD, WaterCAD,
etc.

MS Office products
Point Cloud Tools
Sketchup
Blender, 3DS Max, Maya
Video Editing Tools
Mark possesses 10 years of QA/QC reviewing work for the Power Group and now manages the QC effort. For the last 7 years, he has been designing and reviewing trenchless designs of high and medium voltage crossings of freeways, railroads, rivers, and drainages. The most common designs used are jack and bore, bridge attachments and horizontal directional drilling or HDD.

Mark possesses 38 years of experience in civil private and public projects. His experience ranges from work on erosion control and water quality structures, water and sewer studies and design, hydrology and hydraulics, grading, site planning and layout, earthwork, road design, retaining walls, pedestrian bridges, master plans, military installations, schools, parks, universities, subdivisions, construction observation, report writing, as well as teaching CAD and design software and developing standards. This experience involved the preparation and processing of plans, specifications, and cost opinions for projects as well as preparation of tentative maps with conditions of approval and the associated improvements.

Project Experience
POSEIDON 12 KV DISTRIBUTION UNDERGROUNDING
SAN DIEGO GAS & ELECTRIC | CARLSBAD, CA
Project Engineer - Provided the three-dimensional design for four 12 kV distribution circuits that feed the Poseidon Desalination Plant. In order to provide power to the project a unique approach to supporting fiberglass conduit via engineered steel supports ran down an abandoned pit from the Encina Power Station. Mark also provided QA/QC for all of the getaways from the substation and designed transitions in and out of the two pits and then to the customer side switchgear.

SYCAMORE-TO-PEÑASQUITOS (SX-PQ) 230 KV TRANSMISSION LINE SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Engineer of Record & QC Reviewer - Engineer of Record for the 980’ of jacked and tunneled trenchless method to cross I-15 with two intermediate jacking points along the specially designed 54” diameter reinforced concrete pipe or RCP. Each RCP had a 1’ thick plywood plate between the pipes in the bell-less gasketed joint and to sets of grouting ports to grout the outside of the pipe as part of the permitting requirements.

The RCP was jacked with a sand shield and a manned excavator on the leading edge of the pipe for the cobble bearing soil which made HDD impossible due to cave in of the cobble lenses in the soil and the settlement the cave in would cause on the interstate. He also did all the QC reviews of all the plan sets and as-builts.

NV5 was the Lead Engineer on the SX-PQ 230 kV underground transmission project which constructed 12 miles of underground double circuit 230 kV from Sycamore Canyon Substation to Peñasquitos Substation. The project was needed to provide a bulk power link from desert areas east of San Diego, abundant in solar resources, to the coastal and downtown load centers.

STAFF RESUMES AND ORGANIZATION CHART
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 20

Page 11448877 ends

Project Experience Continued
NV5 was integral to every phase of the project –from concept to construction. Our support during CPCN permitting was crucial to assist the client navigating through difficult environmental and regulatory hurdles as well as assisting with community outreach, and leading both the civil and electrical engineering aspects of the project producing high-quality designs given very difficult engineering challenges.

Challenges included the placement of 35 large vaults and 12 miles of trench alignment with extremely congested city streets, 980 feet of tunneling under the 16-lane Interstate 15, and siting 165-foot cable riser structures without
environmental or visual encroachments. We designed custom vaults with cable racking and a grounding system as well as design and integration of an adjacent fiber optic system for DTS and Partial Discharge ready testing.

NV5 also provided construction support and auxiliary services, produced traffic control plans, acquired all permits from the City of San Diego and Caltrans, and provided on-site materials testing, geotechnical analysis, and survey. We worked with the cable manufacturer to ensure cable design would meet project specifics and cable delivery dates would be met as well as providing witness testing of the cable reels at the
manufacturing plant.

TL673 LA JOLLA 69 KV DIRECT BURY REPLACEMENT

PROJECT
SAN DIEGO GAS & ELECTRIC | LA JOLLA, CA
Engineer of Record & QC Reviewer - Engineer of Record and designed the HDD in all three of its forms for the permit and the minor changes required by contractor to drill it. Also designed the hill holders, an 8” concrete wall keyed into the slope, required by the City of San Diego, and designed to hold the soil on the steep slope after the trench is dug. He also QC reviewed the drawings and the as-builts.

The La Jolla 69 kV Direct-Bury Replacement project installed approximately five miles of new 69kV electric transmission line. This new line replaced the 50-year-old existing directburied cable infrastructure feeding the La Jolla area, which had reached end-of-life and had begun to experience an
increasing number of failures and outages.

The replacement of this critical infrastructure improved the reliability of the transmission grid in Southern California and enabled the delivery of dependable energy to San Diego’s coastal region. Using innovative approaches to navigate and overcome obstacles, this project traversed the congested City of San Diego streets and crossed under La Jolla Parkway, successfully tying the La Jolla area back into the Southern California transmission grid.

A significant obstacle was the high-traffic, hilly location with decades of underground utility infrastructure designers and construction teams needed to strategically navigate to complete the project successfully.

The engineering team worked hard to route the power line away from heavy traffic areas, located vaults away from intersections, and used a horizontal directional drill (HDD) to bore under La Jolla Parkway to avoid traffic congestion at this bottleneck into La Jolla. The new line design also achieved efficiencies.

CARLTON HILLS SUBSTATION
SAN DIEGO GAS & ELECTRIC | SANTEE, CA
Project Engineer - Designed the access road to Carlton Hill Substation. He also provided QC for all of the 12 kV getaways.

VINE SUBSTATION
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Project Engineer - Designed the internal and external 12 kV getaways and two tie-lines in and out of the 69kV substation stepping down to 12 kV for distribution.

CRESTVIEW SUBSTATION
SAN DIEGO GAS & ELECTRIC | SAN DIEGO COUNTY, CA
Project Engineer - Designed three cable-pulled 69 kV tie-lines in and out of the substation using jack and bore to cross Old Highway 80. Also provided QC for all of the 12 kV getaways for the substation.

CERRITOS 66 KV HDD AND JACK & BORE
SOUTHERN CALIFORNIA EDISON | CERRITOS, CA
Project Engineer - This project involved the design of a 227.5- foot jack-and-bore under the Metro Railroad Right-of- Way south of State Route 91 and east of the San Gabriel River. In addition to having to coordinate with the railroad for
encroachment and licensing permits, each end of the bore added additional challenges by being confined within private property areas that fell within the utility’s easement. The bore casing was designed as a 28-inch OD API 5L Steel
Casing Pipe, E80 Loading (ID 27-inch, 0.5-inch wall
thickness, extra heavy).

The project also involved the design of a 721.7-foot 66kV horizontal directional drill (HDD) under State Route 91 approximately 1,100 feet west of the I-605/SR-91
intersection. The bore casing was designed as a 30-inch nominal fusible PVC (ID 28.77” - DR21) with 6-6” and 1-4” fusible PVC carriers for the entire length of the run.

STAFF RESUMES AND ORGANIZATION CHART
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 21

Page 11448888 ends

TENNIS CENTER AND PV RELOCATION

PROJECT
SOUTHWESTERN COLLEGE |

CHULA VISTA, CA
Principal-in-Charge/Sr. Project
Manager

CHARGE READY ELECTRIC VEHICLE

INFRASTRUCTURE PROGRAM
SOUTHERN CALIFORNIA EDISON |

SOUTHERN CALIFORNIA
Principal-in-Charge/Sr. Project
Manager

CIVIL DUE DILIGENCE FOR

NATIONWIDE BUILDOUT OF DELIVERY

CENTERS
CONFIDENTIAL CLIENT | NATIONWIDE
Principal-in-Charge/Sr. Project
Manager
PROJECT VIENTO AGENCY — PLAN

CHECK SERVICES
CITY OF DESERT HOT SPRINGS |

DESERT HOT SPRINGS, CA
Principal-in-Charge/Civil Engineering
Lead

BIG ROCK BATTERY ENERGY STORAGE
SYSTEM — PLAN CHECK SERVICES
COUNTY OF IMPERIAL |

IMPERIAL COUNTY, CA
Project Manager/Lead Civil Engineer

MORELY GREEN PARK
CITY OF SAN DIEGO | SAN DIEGO, CA
Lead Civil Engineer

SOUTH BAY BOTANICAL GARDEN
SOUTHWESTERN COLLEGE | CHULA VISTA,
CA
Civil Engineering Project Manager

HELEN WOODWARD ANIMAL CENTER
HELEN WOODWARD ANIMAL CENTER |

RANCHO SANTA FE, CA
Lead Civil Engineer

GLORIETTA BAY REDEVELOPMENT
CITY OF CORONADO | CORONADO, CA
Lead Project Civil Engineer

HIGH TECH EDUCATION NORTH

COUNTY CAMPUS
HIGH TECH EDUCATION | SAN MARCOS, CA
Civil Engineering Project Manager

HIGH TECH MESA
HIGH TECH EDUCATION | SAN DIEGO, CA
Project Manager

ADA PATH OF TRAVEL PROJECT

SOUTHWESTERN COMMUNITY COLLEGE
DISTRICT | CHULA VISTA, CA
Project Manager

JONATHAN ROWLAND, PE, LEED AP
Civil Engineering Design

EXPERIENCE
23 years (23 with NV5)

REGISTRATIONS
Registered Professional Engineer,
Civil: CA #70191

LEED AP (USGBC)
Certified Instructor for Project
Management Training
Certified Design Quality Control
Manager

EDUCATION
BS, Civil Engineering

AFFILIATIONS
American Society of Civil
Engineers – Director
Society of American Military
Engineers
Jon has more than 20 years of experience providing civil engineering services for complex public‑ and private‑sector projects throughout California and nationwide. He specializes in site development, grading and drainage, stormwater management, utilities, roadway and pedestrian improvements, and regulatory permitting, with extensive experience supporting educational campuses, municipal facilities, private and commercial development, and large infrastructure programs. Jon is known for his collaborative leadership style, proactive project management, and ability to deliver technically sound, constructible solutions that meet schedule, budget, and regulatory requirements.

Project Experience
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 22

STAFF RESUMES AND ORGANIZATION CHART

Page 11448899 ends

SALT CREEK SUBSTATION 138/69/12

KV GETAWAY UNDERGROUND DESIGN
SAN DIEGO GAS & ELECTRIC |

CHULA VISTA, CA
Project Designer

VINE STREET SUBSTATION
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer
OCEAN RANCH SUBSTATION 12 KV

UNDERGROUND DESIGN
SAN DIEGO GAS & ELECTRIC | OCEANSIDE,
CA
Project Designer
LAS COCHES 12 KV

UNDERGROUNDING
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer
RANCHO MISSION VIEJO 12 KV

UNDERGROUNDING
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer

POSEIDON DESALINATION PLANT

DISTRIBUTION UNDERGROUNDING

AND SCADA EXTENSION
SAN DIEGO GAS & ELECTRIC |

CARLSBAD, CA
Project Designer

SAN DIEGO INTERNATIONAL AIRPORT
12 KV UNDERGROUND DESIGN
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer

RANCHO SANTA FE SUBSTATION PLAN

AND PROFILE
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer
TL629/TL6958 CRESTWOOD

SUBSTATION
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer

POWAY SUBSTATION TRANSMISSION

GETAWAY
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer

SAN YSIDRO SUBSTATION GETAWAYS
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer

SAN MATEO SUBSTATION
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer
C261, C262, C263, & C266 CIVIL/

SURVEYS
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer
Yezid has more than 25 years of experience providing surveying, design, and drafting of civil engineering plans for power delivery and infrastructure projects. He has over a decade of distribution experience, with an emphasis on distribution underground, and has extensive experience with substation getaway design.

Project Experience

YEZID FUENTES
Civil Engineering Design

EXPERIENCE
25+ years (20 with NV5)

EDUCATION
AS, Drafting and Design,
ITT Technical Institute
Certificate LDT, Civil Engineering
Program,
Westech College

SOFTWARE
Bentley Microstation
AutoCAD
Microsoft Office Suite

STAFF RESUMES AND ORGANIZATION CHART
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 23

Page 11449900 ends

ROXANNE REYES
Underground Engineering Design Lead

EXPERIENCE
9 years (7 with NV5)

REGISTRATIONS
SDG&E OH/UG Qualified Electric
Designer and Qualified Gas
Designer

EDUCATION
MA, Public Administration,
Concentration: City Planning,
San Diego State University
BA, Public Administration,
San Diego State University

SOFTWARE
AutoCad
Blue Beam
iCUE
Microsoft Office Suite
Roxanne has nine years working in electric distribution design. She currently works on circuit reliability projects to improve and expand the underground distribution system. Prior to NV5, she developed and managed a design and engineering team for multiple San Diego Gas & Electric (SDG&E) Electric Vehicle programs.

Project Experience

POWER YOUR DRIVE & PRIORITY REVIEW PROJECTS
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Project Manager & Lead Distribution Designer - Managed the design and engineering team as well as being the lead distribution designer for this project.

The program included installation of 3,000 electric vehicle (EV) charging nozzles on over 100 separate sites within existing parking lots and garages throughout San Diego and Orange counties. Each site received between six and 50 EV stalls, with the average site receiving approximately 15 stalls. Level 2 EV chargers were installed at multi-family residences and private property businesses across the SDG&E service territory, and a variety of Level 2 and DC fast chargers were installed for public use and company fleet vehicle use.

NV5 devoted three separate teams of engineers and drafters who focused on completing each Power Your Drive project from start to finish. The teams attended the site walk, coordinated design-level survey, prepared a preliminary design drawing, prepared civil construction documents, coordinated with agencies through permit approval, and finished with construction support.

STRATEGIC/DIRECT UNDERGROUNDING PROGRAM
SAN DIEGO GAS & ELECTRIC | VARIOUS LOCATIONS, CA
Distribution Designer - Working with the civil design team to provide electric design services and construction support. NV5 is providing environmental studies and reviews (utilizing our GIS web map tools), permit application and acquisition, civil design, electrical design, overhead/SCADA design, land management and easement acquisition preparation, subconsultant management for utility locating and potholing, site specific fielding, community outreach, standards creation and process improvement, and program management to SDG&E for their Strategic Undergrounding Program.

NV5 began working on this program in 2019. As one of the first design firms on the SUG, NV5 has been a key contributor in the creation of program standards and have shown the ability to quickly adapt and respond to evolving program goals. Through our experience, NV5 demonstrated that we understand how each circuit operates and have provided cost-effective, reliable solutions to improve the circuit by designing an underground path from the source to critical infrastructure.

NV5’s designs have considered environmental, cultural, and biological sensitivities and showcased many of our in-house design capabilities including horizontal directional drilling (HDD), jack and bore, bridge attachments, and unique solutions to provide safe, consistent power while adhering to SDG&E standards. NV5 has provided over 200 miles of underground projects to date.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 24

STAFF RESUMES AND ORGANIZATION CHART

Page 11449911 ends

Project Experience Continued
C221 DUG PHASE 4 - ELECTRIC
SAN DIEGO GAS & ELECTRIC | JULIAN, CA
Distribution Designer - Working with the civil design team to provide electric design services and construction support.

NV5 is providing electric design, civil design, and engineering and support services to underground a complete power feed affecting critical services in an area of extreme fire risk. The scope of work includes more than 6 miles of underground distribution design to provide a complete underground feed from the Santa Ysabel substation to downtown Julian and assure reliable power for critical infrastructure and refuge locations during public safety power shutoff (PSPS) events.

Extreme heat and high wind conditions can trigger PSPS
events. As part of SDG&E’s Strategic Undergrounding
Program, C221’s phases 1, 3, and 4 were challenging yet critical to maintaining essential services in the area.

NV5 worked closely with SDG&E and Caltrans to mitigate
potential design and construction issues. The circuit project faced significant challenges because the route runs along Highway 79 through rocky terrain with limited shoulder space and goes through a portion of Cleveland National Forest that is adjacent to the substation.

NV5 worked closely with Caltrans, using mini horizontal directional drilling where trenching wasn’t possible and even adjusted design of a phase to enable out-of-order construction to meet an ambitious timeline while also accommodating the lengthy approval process required for the public lands portion.

NV5 was involved in every aspect of the project, from survey, UAV and base mapping through environmental and land
services, all the way to permitting and staging yard
identification. NV5’s expertise and agency knowledge and relationships were valuable in meeting critical project milestones on time and on budget. The team’s clear
understanding of the agency’s design preferences helped NV5 successfully negotiate variance where necessary.

C1030 MULTIPLE PROJECTS
SAN DIEGO GAS & ELECTRIC | SAN DIEGO COUNTY, CA
Distribution Designer - Working with the civil design team to provide electric design services and construction support.

NV5 is providing electric design, civil design and engineering and support services to underground a large 12 kV power line replacement project affecting critical overhead infrastructure and customer services in an area of extreme fire risk.

The scope of work includes more than 46 miles of
underground distribution design through terrain with multiple geotechnical constraints, coordination with multiple public agencies and private customers. C1030 was the first circuit project for SDG&E’s Strategic Undergrounding Program, and NV5 worked hand-in-hand on design requirements, program development, processes and procedures in support of
this important fire-mitigation program initiative to limit the occasions where a public safety power shutoff (PSPS) event is required for safety.

The circuit project faced significant challenges in design and construction from environmental and geotechnical constraints as well as logistical constraints from other utilities, land boundary issues, customer issues, and technical issues to achieve project goals. NV5’s involvement began with a full project scoping to identify issues and determine the most effective, efficient solutions and carries through completed construction of all phases. NV5 met client goals through creative app roaches and expert design and engineering. The team worked through every challenge, for one phase even pioneering installation of 200amp SCADA sectionalizing for fallen conductor detection. For the project as a whole, NV5 coordinated with SDG&E’s standards group to develop a
standard for converting overhead meter poles to underground feed.

The team mitigated issues and obtained appropriate
permissions to remove idle facilities, separated work by geotechnical constraints to facilitate contractor bidding and keep construction schedules on track, and they coordinated horizontal directional drilling (HDD) installation through dense oak areas near wetlands to avoid environmental restrictions.

NV5’s problem solving even included development of
communication tools between backbone design and service conversion work to enable payment to electricians. By
working through the project’s extensive complications to deliver construction-ready drawing sets, as well as approved permitting and environmental releases before supporting construction, NV5 set the standard for success for a critical client program.

EDP RELIABILITY/SUBSTATION GETAWAYS
SAN DIEGO GAS & ELECTRIC | LA MESA & IMPERIAL BEACH, CA Distribution Designer - Installing new UG circuits to offload existing overloaded circuits and improve grid performance.

Worked with the civil design to provide electric design services and construction support.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 25

STAFF RESUMES AND ORGANIZATION CHART

Page 11449922 ends

C908 DESIGN + SURVEY TOA 10
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C908 DUG - ELECTRIC
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C908 DUG
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C520 DESIGN + SURVEY
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C445 DESIGN + SURVEY
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C157 DESIGN + SURVEY
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C176 DESIGN + SURVEY
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C470 DESIGN + SURVEY
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
COLE GRADE ROAD 20A
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
NEW C1191, CH: NEW CB C1191
DDOR 2020
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C1154 EG OFFLOAD GE3233 DDOR
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C706, MS: POLE LINE REMOVAL -

ELECTRIC
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
C1458 PHASE 1A CONSTR SUPPORT
- ELECTRIC
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
COW CAMP RD PHASE 2A/2B - OH

RELOCATION
SAN DIEGO GAS & ELECTRIC| SAN DIEGO,
CA
Senior Distribution Designer
Candice has 23 years of experience in the construction industry with significant experience as a project manager for underground, gas, and overhead utility work. She has successfully managed projects on time and within budget as well as completed utility designs for numerous SDG&E reliability, capacity, smart meter networking, LPCN, FiRM, CNF and other projects. She excels at site due diligence, cost estimating, fulfilling permit requirements for appropriate agencies, and completed design drawings and calculations for complex projects.

Project Experience

CANDICE HOLLEY, PMP
Underground Engineering Design

EXPERIENCE
23 years (10 with NV5)

REGISTRATIONS
Project Management Professional
(PMP)
SDG&E Applicant Design Underground Certified

EDUCATION
BA, University of Tennessee
Primavera P6.2 Basic Training,
Oracle University
Sempra Energy Utility - Gas
Technical Services and Gas AsBuilt Mapping
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 26

STAFF RESUMES AND ORGANIZATION CHART

Page 11449933 ends

UNDERGROUND TRANSMISSION
LINES
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Manager
16-INCH HIGH PRESSURE GAS LINE
49-28 RELOCATION
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Senior Designer

SUNCREST SUBSTATION
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Manager
TL615 AND TL659 UNDERGROUND

CABRILLO ENGINEERING
SAN DIEGO GAS & ELECTRIC |

POINT LOMA AND SAN DIEGO, CA
Project Designer
TL673 LA JOLLA 69 KV DIRECT BURY

REPLACEMENT PROJECT
SAN DIEGO GAS & ELECTRIC |

LA JOLLA, CA
Project Designer
SYCAMORE-TO-PEÑASQUITOS (SX-PQ)
230 KV TRANSMISSION LINE
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer

LAGUNA NIGUEL RELIABILITY

ENHANCEMENT PROJECT
138 KV UNDERGROUNDING
SAN DIEGO GAS & ELECTRIC |

LAGUNA NIGUEL, CA
Project Designer
TL633 RANCHO CARMEL SUBSTATION
TO BERNARDO SUBSTATION 69 KV RECONDUCTOR UNDERGROUNDING SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer
TL6926 UNDERGROUNDING COLE

GRADE ROAD
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer

SOUTH ORANGE COUNTY RELIABILITY
ENHANCEMENT (SOCRE) - 230 KV

TRANSMISSION UNDERGROUNDING
SAN DIEGO GAS & ELECTRIC |

ORANGE COUNTY, CA
Project Designer
TL690E + C202 UNDERGROUNDING
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Project Designer

MARTIN JAIMES
Underground Engineering Design

EXPERIENCE
18+ years (2 with NV5)

REGISTRATIONS
Registered Professional Engineer,
Civil: Mexico #2211078

EDUCATION
BS, Civil Engineering,
Technological Institute of Tijuana,
Mexico

SOFTWARE
Bentley MicroStation
AutoCAD
Microsoft Office
Martin is a project manager for NV5’s San Diego office. For 18+ years, Martin has involved himself in both field and office aspects of civil engineering and land surveying. The focus areas for his project management are engineering the conversion of existing electrical overhead lines to underground system, including distribution lines and transmission lines of 69 kV, 138 kV, & 230 kV; utility location and mapping, engineering design for jack & bore structures, configurations of Horizontal Directional Drill structures to function as elements to avoid impacts over environmental areas, sensitive wet lands, streams and rivers. Other related procedures of engineering include design grading and improvement plans according to city, county and state regulations as well the construction support.

Project Experience
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 27

STAFF RESUMES AND ORGANIZATION CHART

Page 11449944 ends

DIAR
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer/PLS-CADD Engineer

FRANCHISE POLES
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer/Pole Modeling
C221 DUG PHASE 1 - OH
SAN DIEGO GAS & ELECTRIC | JULIAN, CA
Designer/PLS-CADD Modeling
C221 DUG PHASE 2 - OH
SAN DIEGO GAS & ELECTRIC |

SANTA YSABEL, CA
Designer/PLS-CADD Modeling
C445 DUG - OH
SAN DIEGO GAS & ELECTRIC |

BOULEVARD, CA
Designer
C1458 PHASE 2 SUG
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
CAD Technician
C220 - ELECTRIC
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C358 DUG - ELECTRIC
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C555, EC: CUTOVER LOAD TO C549
- DDOR 2021 - ELECTRIC DESIGN
SAN DIEGO GAS & ELECTRIC |

EL CAJON, CA
Designer
URBAN SUB REBUILD: INST TWO MH
- ELECTRIC
SAN DIEGO GAS & ELECTRIC |

EL CAJON, CA
Designer
SSC1 CUTOVER FROM 4KV TO 12KV
C330-ELECT
SAN DIEGO GAS & ELECTRIC |

SAN CLEMENTE, CA
Designer
C65, RN:C65 OFFLOAD TO C270-
DDOR 2021
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C303 303-138 P107947 HRSR -

ELECTRIC
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer

WIRELESS FAULT INDICATOR PROJECT
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
CAD Technician
C1047 NEW CIRCUIT
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
CAD Technician
Louis is a distribution designer with six years of experience specializing in overhead distribution projects and pole modeling with PLS-CADD and O-Calc. He is an SDG&E Overhead Qualified Designer and is proficient in AutoCAD, Civil 3D, PLS-CADD, PLS-POLE, and O-Calc software.

Project Experience

LOUIS CANONICO
Underground Engineering Design

EXPERIENCE
6 years (6 with NV5)

REGISTRATIONS
SDG&E OH Qualified Designer
O-Calc Pro-Pole Loading Analysis
Software (16-hr)

EDUCATION
BA, Integrated Marketing
Communications,
Roosevelt University

SOFTWARE
AutoCAD
Civil 3D

PLS-CADD

PLS-POLE
O-Calc
Microsoft Office Suite
Adobe Suite
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 28

STAFF RESUMES AND ORGANIZATION CHART

Page 11449955 ends

GODEFROY DEVYS, PE
Overhead Engineering Design Lead

EXPERIENCE
8 years (8 with NV5)

REGISTRATIONS
Registered Professional Engineer,
Civil: AZ #80016, CA #91712,
NM #29991, OR #101399PE

EDUCATION
MS, Civil / Structural
Engineering,
University of California,
Los Angeles

AFFILIATIONS
American Society of Civil
Engineers (ASCE)

SOFTWARE
AutoCAD
CTAbut
Mastan2
MathCAD
Matlab
Microsoft Office
MS Project
PSBeam
Perform 3D
RAM
Revit

PLS-CADD
PLS-Pole
MFAD
OCalc
Godefroy has eight years of experience in the design of steel, concrete and masonry structures. He has also performed structural investigations for buildings and bridges, and designed repairs to existing structures. He is skilled in advanced structural analysis, advanced reinforced concrete, finite element analysis, advanced steel design, structural response to ground motion, structural dynamic, and ground motion characterization.

Godefroy also brings extensive expertise in the overhead distribution industry, particularly through his advanced use of PLS-CADD and PLS-POLE. His experience includes creating detailed and accurate PLS-CADD components based on manufacturer cutsheets, contributing to the development of overhead distribution design standards, and ensuring high-quality deliverables through rigorous quality control processes. He is proficient in performing pole foundation analyses and has consistently supported complex distribution projects with precision and efficiency. His deep knowledge of PLS-CADD and PLS-POLE makes him a valuable technical resource and a leader in the field.

Project Experience

POLE LOADING COMPLIANCE PROGRAM (PLCP)
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Assistant Engineer - Provided structural calculations for pole embedments, crossarms and pole loadings as part of the PLC program. Reported SDG&E and GO95 violations. (Design and True-Up).

C1030 MULTIPLE PROJECTS
SAN DIEGO GAS & ELECTRIC | SAN DIEGO COUNTY, CA
Assistant Engineer - Providing construction support for FCA and designed retaining walls and concrete slabs to control some erosion issues and divert the water from damaging some cable poles. NV5 is providing electric design, civil design and engineering and support services to underground a large 12 kV power line replacement project affecting critical overhead infrastructure and customer services in an area of extreme fire risk. The scope of work includes more than 46 miles of underground distribution design through terrain with multiple geotechnical constraints, coordination with multiple public agencies and private customers.

C157 RECONDUCTOR 12 KV FROM BARE WIRE TO COVERED CONDUCTOR &

WOOD TO STEEL CONVERSION
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Assistant Engineer - Provided structural calculations for pole embedment, crossarms and pole loadings as part of the FiRM (Fire Mitigation) program using PLS-CADD, in charge of the QC, and of the construction support. Then in charge of the as-builting the project (True up the PLS model based on what was installed on the field).

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 29

STAFF RESUMES AND ORGANIZATION CHART

Page 11449966 ends

Project Experience Continued
One of the pilot projects for SDG&E where they used Covered conductor for the first time on a large scale project. We had to learn those new wires and designing the projects without being able to anticipate the wire sags and tensions, so it required a lot of adjustments. Unique situations with 1,800ft long spans over a lake with that new wire, so we had to think outside of the box and order some special material for the dead ends.

SSC1 CUTOVER FROM 4 KV TO 12 KV C330
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Assistant Engineer - Providing construction support for FCA and was the PLS modeling and final internal QC of all the deliverables on the structural side using PLS-CADD. NV5 converted over 202 existing 4 kV transformers and related equipment to 12 kV distribution circuit as part of a 4 kV distribution modernization program.

We analyzed over 700 existing distribution poles for structural integrity and made wood to steel upgrades as needed,
reinsulated existing structures that were not being replaced with steel poles and fiberglass arms, and upgraded antiquated primary and secondary conductors to meet the 12 kV load demands, converting small copper conductor to larger
aluminum and ACSR conductors.

NV5 incorporated low-cost reliability improvements such as Fault Indicators and sectionalizing, and cutover for underground stations, including new trench and conduit, cable and connection plans. NV5’s scope included feasibility studies, LiDAR survey, conventional survey, subsurface utility mark-out, civil engineering for ADA and pedestrian clearance requirements, permitting and easement support, construction support services, project management and post-construction as-built, and standards compliance confirmation.

ES4 4 KV TO 12 KV CUTOVER
SAN DIEGO GAS & ELECTRIC | ESCONDIDO, CA
Assistant Engineer - Designed the pole replacement using PLS-CADD, performed internal final QC checks, performed hand calculations to calculate wood alley arms on wood or steel poles when the use of fiberglass arms was not feasible.

Produced a calculation package of 70+ sheets per pole (about 10 poles total). NV5 converted existing 4 kV transformers and related equipment to 12 kV distribution circuit as part of a 4 kV distribution modernization program.

C315 SOCRE I-15 CROSSING NETTING/DESIGN PERMITTING
SAN DIEGO GAS & ELECTRIC | SAN JUAN CAPISTRANO, CA
Assistant Engineer - Provided structural calculations of a netting design over the I-15 freeway that spans 80 feet for the installation of new wires for circuit C315 over the freeway.

Godefroy designed the poles and anchors able to catch a wire falling on it.

C445 DESIGN & SURVEY
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Assistant Engineer - Rebuilt the original C445 circuit section with covered conductor. Provided structural calculations for pole embedments, crossarms and pole loadings as part of the Fire Mitigation program. In charge of verifying and stamping all MFAD calculations for FiRM packages above 90.

WALL 609/614 TIE-BACK WALL INSPECTION (MID-COAST

CORRIDOR TROLLEY EXTENSION
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Assistant Engineer - Performed periodic site inspections during the installation of a soil nail and pre-stressed tie-back retaining wall; part of which was directly adjacent to a 16” steel high-pressure gas pipe line. Provided owners
representation and reported directly to owners project
manager.

ALLEY ARM CALCULATIONS
SAN DIEGO GAS & ELECTRIC | SAN DIEGO, CA
Engineering Manager - Performed hand calculations to
calculate wood alley arms on wood or steel poles when the use of fiberglass arms was not feasible. Produced a
calculation package of 70+ sheets per pole (about 40 poles total).

EXCHEQUER TO YOSEMITE 70KV RECONDUCTOR
PACIFIC GAS & ELECTRIC | YOSEMITE
Engineering Manager - In charge of quality control on site:
rebar verification, concrete tests (air entrainment, slump, temperature, and cast cylinders for compressive strength tests). Also supervised a team of geotechnical engineers who were tasked with observing drilling and grouting activities, anchor installation and proof/performance testing of all anchors. All work, including personnel and material handling was performed with helicopters as vehicle access to each site was not possible due to terrain.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 30

STAFF RESUMES AND ORGANIZATION CHART

Page 11449977 ends

POLE LOADING COMPLIANCE

PROGRAM (PLCP)
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Group Manager
C0222 GROUP 2 PHASES F - L

ENGINEERING
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Group Manager
ESH 0222 UG GROUP 1 PHASES A-E
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Group Manager
ESH 0222 UG GROUP 1
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Group Manager

NEW BUSINESS PROJECTS
PACIFIC GAS & ELECTRIC | CONCORD, CA
Engineering Supervisor
07D/2AA POLE UPGRADE PROJECTS
PACIFIC GAS & ELECTRIC | CONCORD, CA
Distribution Engineer

BUTTE COUNTY OVERHEAD REBUILD
PACIFIC GAS & ELECTRIC | CONCORD, CA
Distribution Engineer

POST ESTIMATING
PACIFIC GAS & ELECTRIC | CONCORD, CA
Engineering Supervisor

JOINT USE MAKE READY WORK
ARIZONA PUBLIC SERVICE | PHOENIX, AZ
Group Manager

KRISTA MIGUEL
Overhead Engineering Design
Krista is a Distribution Group Manager with eight years of experience in technical design and as a project lead. Her path from Distribution Engineer to Distribution Operations manager has provided her an opportunity to grow in multiple engineering facets as well as given her the ability to lead and coordinate a multitude of projects. With a steep background working with Pacific Gas & Electric, she built a training procedures document to help ensure compliance as well as efficiency and teamwork. As an engineer, she spent time working on 12 kV single line poles, substructures, voltage drop calculations and more.

Project Experience

EXPERIENCE
8 years (3 with NV5)

REGISTRATIONS
Engineer-in-Training (EIT)

EDUCATION
BS, Electric Engineering,
California State University

SOFTWARE
AutoCAD

PLS-CADD
O-Calc Pro
ED GIS/Webviewer
EES
FFE
Bluebeam Revu
SAP
Office Suite

STAFF RESUMES AND ORGANIZATION CHART
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 31

Page 11449988 ends

ES4 CUTOVER FROM 4 KV TO 12 KV
C513 AND C514
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
TRANSFER C568 AND C569 TO C201
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
WISE C474, FE: R11 OH

RECONDUCTOR
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C1242 RMV: OH REMOVAL
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C445-F TRUE UP REMEDIATION TOA
217 & C445 DESIGN AND SURVEY
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C757 BQ-CUTOVER 562A/C753
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
BUILDING 5 CAP REPLACEMENT
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
16-0138 MARLESTA DRIVE/BEAGLE
STREET 20A
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C211 DESIGN AND SURVEY
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C520 DESIGN AND SURVEY
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C470 DESIGN AND SURVEY
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C908 DESIGN AND SURVEY
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer
C73 DESIGN AND SURVEY
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Designer

CLIFF HOWELL
Overhead Engineering Design
Cliff has 12 years of experience providing services to the utility industry. In his current role he designs and prepares construction orders related to overhead, underground facilities; associated with electric distribution systems applying prescribed standards, guides, specifications and procedures. He is also responsible for preparing computer assisted design and construction drawings of a complex nature with neatness and a minimum of errors, design services requiring a full understanding of drawings, specifications, and industry and company standards covering the assigned work, and preparation of engineering calculations (pole loading, guying, transformer sizing, load studies).

Project Experience

EXPERIENCE
12 years (8 with NV5)

REGISTRATIONS
San Diego Gas & Electric
Qualified Applicant Designer
(Underground Electrical Design,
Overhead Electrical Design, and
Gas Design), 2018
San Diego Gas & Electric O-Calc
Certified, 2018

EDUCATION
AA, Construction Management,
Mesa Community College
Cuyamaca College & San Diego
Gas & Electric Utility Design
Distribution (Pilot Program)
International Brotherhood
of Electrical Workers (IBEW)
Apprenticeship, 2005

SOFTWARE
Esrl ArcGIS 9
Microsoft Office Suite
Archibus
DPSS
Workload Management - WLM
SAP
Silverlight GIS
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 32

STAFF RESUMES AND ORGANIZATION CHART

Page 11449999 ends

JAMES PASQUAN
Overhead Engineering Design

EXPERIENCE
19 years (19 with NV5)

REGISTRATIONS
SDG&E Certified UG Electric
Designer
SDG&E Approved Gas Designer
SCE Qualified Applicant Designer

EDUCATION
Drafting/Occupational
Competency & Architectural
Drawing,
Palomar College

SOFTWARE
Autocad 2000-2018
Adobe
Bluebeam
Microsoft Office Suite
DIMP 643632 REN 2185FT-2IN PE
SAN DIEGO GAS & ELECTRIC | SAN DIEGO,
CA
Designer
DIMP 582031 REN 4931FT-2IN PE
AND 110 SVCS - WOOSTER DR - OC
SAN DIEGO GAS & ELECTRIC | SAN DIEGO,
CA
Designer
DIMP 651054 REN 1623FT-3INPE
SAN DIEGO GAS & ELECTRIC | SAN DIEGO,
CA
Designer
C73 DESIGN + SURVEY
SAN DIEGO GAS & ELECTRIC | SAN DIEGO,
CA
Designer

MIDCOAST CONTRACT WORK
SAN DIEGO GAS & ELECTRIC | SAN DIEGO,
CA
Designer
3ROOTS - CARROLL CANYON
LENNAR HOMES | SAN DIEGO, CA
Designer
EL PASEO TENTATIVE TRACT 20082
KB HOME | FONTANA, CA
Designer
TRACT 36779
MCKELLAR MCGOWAN LLC | LA JOLLA, CA
Designer

CITRUS GLEN
KB HOME | LOMA LINDA, CA
Designer
NEIGHBORHOOD 1 & 2 BRIDGES

APARTMENT SITE
ANTON DEVCO, INC. | MURRIETA, CA
Designer
James has 16 years of dry utility drafting & design experience in drafting & design for SCE & SDG&E residential, commercial and public works electric & gas distribution systems, design and draft dry utility composite drawings including, telco, CATV, fiber, & other communication utilities, and conduct field inspections & structure verification for various projects.

Project Experience
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 33

STAFF RESUMES AND ORGANIZATION CHART

Page 11550000 ends

POLE LOADING COMPLIANCE

PROGRAM (PLCP)
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II

DRONE INVESTIGATION AND REPAIR
(DIAR) PROGRAM
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II
C1162, BD: NEW C1162 PHASE 1
PLAN B
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II
PB1, PB: RECONDUCTOR PB1 & PB5
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II
ESH 0445 GROUP 3
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II
AM1, AM: CUTOVER TO C166
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II
C1162, BD: NEW C1162 PHASE 1
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II
C0222 GROUP 2 PHASES F - L

ENGINEERING
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II

WEE MOBILE HOME PARK
SAN DIEGO GAS & ELECTRIC |

SAN DIEGO, CA
Team Lead/Designer II
Nicholas has 10 years of engineering experience including providing leadership for the planning, development, and implementation of large-scale, major strategic business and technology projects and is responsible for managing a team of 17 engineers across multiple ESH programs including DIAR, EDP, SUG, and PLCP and for managing and tracking analytics for PLS-CADD and O-CALC Engineering Teams. He creates and implements process documentation to increase efficiency across programs and provides efficient project scoping to ensure stakeholders requests are completed within specified timelines and on budget.

Nicholas applied pole loading analyses and design using Osmose O-Calc Pro, PLS-CADD, and SPIDAcalc, performs QA/QC on O-Calc/PLS-CADD analyses to ensure it meets SDG&E standards, and works directly with engineers to provide training and foster future development. He prepares drawings and documentation for construction of distribution line projects, as well as provides client-facing support to SDG&E for the PLCP program.

Project Experience

NICHOLAS WEARY
Overhead Engineering Design

EXPERIENCE
10 years (4 with NV5)

REGISTRATIONS
SDG&E OH Qualified Designer
Program

EDUCATION
AS, Mathematics & Natural
Science Computer Science,
Grossmont Community College

SOFTWARE
Osmose O-Calc Pro

PLS-CADD
SPIDAcalc
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 34

STAFF RESUMES AND ORGANIZATION CHART

Page 11550011 ends

Luanne brings over 35 years of expertise in the engineering, design, and construction of capital improvement projects. As a Registered Civil Engineer and former Class A General Engineering Contractor, she offers a unique perspective on construction from both the design and execution sides.

Her technical proficiency spans the preparation of engineering plans, specifications, and cost estimates, as well as construction management and program management for facilities, streets, water, wastewater, and related infrastructure projects.

Project Experience

CROWTHER SANITARY SEWER PIPELINE REPLACEMENT
CITY OF PLACENTIA | PLACENTIA AND FULLERTON, CA
Construction Manager. Ms. Bean oversaw the Construction Management and Inspection Services as the Construction Manager for this project, which includes replacement of approximately 7,400 LF of gravity sewer pipeline in Crowther Avenue, Placentia Avenue, and Orangethorpe Boulevard, located within the Cities of Placentia and Fullerton. The work involved installation of 15-inch, 18-inch, and 22-inch PVC and fused HDPE sewer pipeline and manholes. The work also included reconnection into all of the existing gravity mains and service laterals with a terminus tie-in connection at the existing Orange County Sanitation District’s trunk line on State College Boulevard. The project, which included an encasement crossing underneath the 57 freeway in Caltrans right-of-way, involved coordination with multiple agencies, including Caltrans, the Orange County Sanitation District, Golden State Water, Department of Health Services, the City of Fullerton, and other utility and governmental agencies. Working in high-traffic areas, as well as a jack-and-bore crossing underneath the Orange County Flood Control District’s flood control channel and a jack-and-bore crossing underneath the BNSF railroad, and multiple crossings of Southern California Gas Co.’s high-pressure gas feeder, were among the project’s challenges. NV5 also provided materials testing services for this project.

ARANTINE HILLS SEWER AND WATER INFRASTRUCTURE PROJECTS
CITY OF CORONA | CORONA, CA
Project Manager/Construction Manager. Ms. Bean oversaw the construction management and inspection services for the $14.7M, three-phase Arantine Hills sewer and water improvement projects to provide the necessary infrastructure for the Arantine Hills Development project. The project involved the construction of a buried cast-in-place sewer lift station with above-grade controls. This was connected to a second project to construct the sewer force main with fused HDPE pipe via conventional open trench and trenchless jack-and-bore sewer construction along arterial streets and Caltrans ROW, forming 4 miles of pipeline.

Relocation of 3,300 LF of potable water line also was required to install the new force mains. A third project managed simultaneously was the construction of the California Avenue Sewer at a depth of 25 feet below grade. All three projects were to be completed together for the final and finished sewer lift station to function.

LUANNE BEAN, MS, PE
Construction Management

EXPERIENCE
35 years (8 with NV5)

REGISTRATIONS
Registered Professional Engineer,
Civil: CA #50129
Former Class A General
Engineering Contractor

FEMA OPS - I
HAZMAT First Responder/
Operations Level
DOT Offers of Bulk and Non-Bulk
HAZMAT Packages
Nuclear Waste Safety
for Workers
SCRRA Safety Trained
Confined Space Entry Trained

EDUCATION
MS, Civil Engineering
BS, Civil Engineering
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 35 RESUME

Page 11550022 ends

Project Experience Continued

DIVERSION PIPELINE
CITY OF CULVER CITY | CULVER CITY, CA
Project Manager/Construction Manager. Ms. Bean oversaw
the construction management, inspection and engineering services for the construction of sewer main diversion pipes reversing sewer flow via conventional cut and cover as well as trenchless jack and bore methods to abandon Mesmer and
Overland Sewer Pump Stations. This also involved extensive permits and coordination with Caltrans, the City of Los Angeles, and the City of Culver City for these jack and bore pipelines underneath the I-405 and Route 90. The goal of the project was to divert flows from four of the City’s sewer pump stations to a new sewage pump station, Bankfield Station, which is another project in which NV5 provided construction management and inspection services during construction.

SEPTIC-TO-SEWER PROJECT, PHASE II
HI-DESERT WATER DISTRICT | YUCCA VALLEY, CA
Senior Construction Manager. NV5 is serving as the Owner’s Representative and providing Construction Management
services for Phase II of the District’s Septic-to-Sewer project in Yucca Valley. Identified by the Regional Water Quality Control Board as a priority area, the Town is transitioning from septic systems to a centralized wastewater system. Following Phase I, which established the initial collection and treatment infrastructure, Phase II will expand the system to serve approximately 1,900 parcels with 170,000 feet of gravity pipelines. NV5’s role includes project management, funding support, procurement assistance for the progressive designbuild team, peer review, technical oversight, and construction inspection. The project, with an estimated construction cost over $64M, is expected to be completed by the end of 2025.

AZUSA SEWER LIFT STATION UPGRADE PHASE II SITE

IMPROVEMENT
CITY OF WEST COVINA | WEST COVINA, CA
Construction Manager. Ms. Bean is serving as Construction Manager for the Azusa Sewer Lift Station Upgrade Phase II Site Improvement project. Our team is providing construction management and inspection services for the project, which includes upgrading existing sewer pumps, equipment,
controls, conduits wiring and appurtenances; storage capacity to provide backup emergency power in the event of power outages to mitigate risk of sewer system overflow; and SCADA monitoring that will provide feedback of pump disposition fluid levels, air system, alarms and additional information.

CALIFORNIA AVENUE SEWER MAIN
CITY OF CORONA | CORONA, CA
Project Manager/Construction Manager. As part of the
Arantine Hills Sewer projects, Ms. Bean oversaw the
construction management and inspection services on the
California Avenue Sewer Main project, which consisted of nearly 9,000 LF of sewer main up to 24 feet deep within the congested City streets. After initial potholing, some extensive field rework was required to fit the sewer line into the City streets due to unforeseen conflicts not originally shown on the plans. These conflicts were found during potholing and necessitated going back to the Department of Health for encroachment to the City’s potable water line with the new sewer construction. NV5 also has provided public outreach and full-time soils compaction testing for the cut-and-cover conventional trench and bore-and-jack construction through congested intersections. This project served the final
completed run connecting the Arantine Hills Lift Station to the Arantine Hills Force Main through this gravity interceptor, allowing conveyance of the City’s sewer to its downtown treatment plant. Upon completion of the project, the City planned to abandon other lift stations and smaller, aging wastewater treatment plants.

EMERGENCY PEARL AVENUE SEWER REPLACEMENT
CITY OF COMPTON | COMPTON, CA
Project Manager/Construction Manager. Ms. Bean lead
the team to provide a quick two-week design of City of
Compton’s failed Pearl Avenue sewer that was overflowing on an emergency basis. Ms Bean then spearheaded the
efforts for bids to the City on an emergency bid to obtain a Class A General Engineering Contractor, then recommended award the lowest responsive and responsible bidder.

During construction, Ms. Bean led the team in Construction Management and Inspection to support the City’s effort in the emergency replacement of 3,600 LF of failed 8-inch sewer main in a residential district with connections in a busy fourlane arterial roadway. Through Ms. Bean’s team efforts, start to finish, this project was completed in approximately three months.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 36

STAFF RESUMES AND ORGANIZATION CHART

Page 11550033 ends

John has 40+ years of experience in the utility industry providing construction, project management, and planning for a wide variety of utility projects.

Project Experience

ENGINEERING, DESIGN, AND SUPPORT
CITY OF RANCHO CUCAMONGA | RANCHO CUCAMONGA, CA
Inspector - Municipal utility planning, design, and engineering services for underground electric distribution system, electric transmission circuit planning and design, substation planning, mapping and records keeping, and construction inspection services. John works with the developer and field personnel to inspect the new installation of electric facilities to confirm they are abiding by City standards. He also coordinates field meetings and maintains records for completion of project sites by working closely with the construction supervisors, NV5 Principal, and City staff.

ENGINEERING, DESIGN, AND SUPPORT
CITY OF INDUSTRY | CITY OF INDUSTRY, CA
Inspector - Municipal utility planning, design, and engineering services for underground electric distribution system, private telecommunications substructure system, electric transmission circuit planning and design, substation planning, mapping and records keeping, and construction inspection services. John works with the City staff to assist with the coordination of new business meter installation, building and safety releases, field coordination with inspections, and assisting the NV5 Principal with day to day management effort. John works with the developer and field personnel to inspect the new installation of electric facilities to confirm they are abiding by City standards. John coordinates field meetings and maintains records for completion of project sites by working closely with the construction supervisors, NV5 Principal, and City staff.

ENGINEERING, DESIGN, AND SUPPORT
CITY OF CORONA | CORONA, CA
Inspector - Municipal utility planning, design, and engineering services for underground electric distribution system, private telecommunications substructure system, electric transmission circuit planning and design, substation planning, mapping and records keeping, and construction inspection services. Services also included providing cost estimates and feasibility studies, providing city staff functions for new customer coordination and negotiations, policy development, on-call emergency call out staffing, and construction inspection services. John works with the City staff to assist with the coordination of new business meter installation, building and safety releases, field coordination with inspections, and assisting the NV5 Principal with day to day management effort. John works with the developer and field personnel to inspect the new installation of electric facilities to confirm they are abiding by City standards. John coordinates field meetings and maintains records for completion of project sites by working closely with the construction supervisors, NV5 Principal, and City staff.

JOHN OATES
Construction Inspection

EXPERIENCE
40+ years (21 with NV5)

REGISTRATIONS
Electrical C-10 License
NABCEP Solar Certification
City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 37 RESUME

Page 11550044 ends

H. ADDITIONAL INFORMATION

30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.

NV5 PROJECT MANAGEMENT APPROACH
NV5 applies a structured, transparent, and outcomesfocused project management approach to ensure scope, schedule, cost, and quality objectives are met. We assign a dedicated Project Manager as single point of contact and use a Work Breakdown Structure (WBS) within our project financial trackers to align tasks, responsibilities, deliverables, and acceptance criteria across design and delivery teams.

Change control, risk registers, and an issues escalation path are in place from project initiation through closeout.

OVERALL METHODOLOGY
We follow a phased lifecycle (Initiation → Planning →
Design/Execution → Closeout) with iterative checkpoints and gated reviews at key milestones. The PM integrates
technical leads, discipline managers, client representatives, and construction/quality assurance resources into crossfunctional teams to accelerate issue resolution and reduce rework. Collaboration tools (Teams, SharePoint) and defined meeting cadences (weekly design reviews, biweekly client updates, monthly executive reviews) keep communication
disciplined and timely.

QUALITY ASSURANCE/QUALITY CONTROL
Quality is done by a robust Quality Assurance/Quality
Control (QA/QC) policy where technical leads have a tracked procedure to do a final cold-eye review after both selfreview and manager review. Our QA/QC process includes standardized checklists, deliverable-specific review
templates, logged review records, and non-conformance
tracking. Technical leads sign off on final submittals; lessons learned from each review are captured and fed back into project procedures to continuously reduce risk.

COST CONTROL
Cost control is done via financial software by reporting to designers weekly and utilizing SharePoint for cross-team visibility. We maintain a project budget baseline and perform weekly cost-to-date vs. budget reporting, forecast updates, and variance analysis. Change orders and potential cost impacts are captured through the change-control workflow and communicated immediately to the PM and client so
mitigation options are enacted early.

SCHEDULE CONTROL
Schedule control is set with a Gantt chart, with milestones tracked throughout the project life cycle process via Teams for visibility for the entire team. A baseline schedule is established in planning, critical-path activities are monitored, and progress updates are posted weekly. We track percent complete at the task level, monitor float and slippage, and deploy recovery actions when milestones drift.

PROJECT TRACKING & PERFORMANCE

MONITORING
Performance monitoring includes tracking KPI’s for schedule and budget. We supplement those KPIs with earned-value
metrics, milestone adherence, and quality indicators (review cycle times, open non-conformances). Real-time dashboards provide PMs and stakeholders visibility into schedule
performance and cost performance.

PROGRESS REPORTING PROCEDURES
Regular reporting includes a concise weekly progress
brief to the design team, a formal monthly progress report (summarizing schedule, cost, risk, quality, and action items), and milestone release packages. All reports, key documents, and versioned deliverables are stored in SharePoint with controlled access; Teams is used for immediate notifications and meeting artifacts. This combination of disciplined
process, tool-enabled visibility, and accountable technical leadership ensures predictable delivery and high client confidence.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 38

PROJECT MANAGEMENT APPROACH

Page 11550055 ends
Page 11550066 ends

COLLABORATIVE CITY SUPPORT
NV5’s staff has worked with a number of Southern California cities under similar on-call agreements providing construction management and inspection including City of Culver City, City of Anaheim, City of Yorba Linda, City of Laguna Woods, City of South Pasadena amongst others, and understands how to maintain continuity with City staff as well as with internal and external experts and engineering teams. Whether reviewing a submittal, responding to an RFI, meeting with residents, or coordinating with a utility provider, our role is to be an extension of City staff, enforcing RCMU’s standards/plans/ specifications, protecting RCMU’s assets, ensuring that public funds are appropriately spent in accordance with the project requirements. NV5 believes our involvement will bring added value to RCMU both in the field and in the office.

NV5 takes this a step further by formulating and
implementing a proactive public relations program and a concerted effort to manage expectations, assure safety, and build goodwill, focusing on transparency and minimizing disruption. NV5’s careful attention to detail with documented construction inspection and detailed construction
management will minimize or eliminate RCMU’s exposure to claims. With NV5, RCMU will gain not only technical depth, but also a collaborative mindset, engineering expertise, and a consistent, professional presence.

CONSTRUCTION MANAGEMENT
NV5’s team of expert construction managers will become
a collaborative part of RCMU’s team in managing the
construction contractor. At NV5, construction management includes contract review, constructability review of plans and specifications, receiving/logging/tracking/responding to RFIs and submittals. An important element is also review of the Contractor’s baseline construction schedule for critical path as well as monthly construction updates and three weeks look ahead schedule reviews. Validation of change orders for entitlement as well as reasonableness of labor/materials/ equipment as well as time-impact against the critical path.

The elements of Construction including RFI’s/change orders/ inspectors daily reports/ weekly statement of working days/ and many more elements of Construction Management are
also logged in our document control center CMIS, which is free for RCMU to use on any NV5 project.

Cost control comes in the form of internal to NV5 managing our own contract with RCMU, as well as managing external cost control for RCMU’s Contractor to see to it that the construction is completed within the as-bid amount with validated change orders. At NV5, Contractor’s progress
payments are first validated for completed quantities
that month by the inspector, followed by validation by the Construction Manager for the remainder of the payment
application math including retention. Finally, NV5 will act as a liaison between the contractor, RCMU’s engineer of record, other agencies, and City staff.

COMMUNICATION AND MEETINGS
Our construction support team will be the point of contact for project correspondence and communication between
RCMU, the contractor, the design team and other project stakeholders. Our team will be in constant communication with RCMU’s project manager, making sure he or she has
updated information on project status, as well as any on-site or any contractual issues. NV5 can host pre-construction meetings, progress meetings, as well as other meetings such as integration meetings, startup and testing meetings, tie-in meetings including agenda and minutes to be distributed within 2 days of the meeting. NV5’s regular construction meetings held with City Staff, Engineer (as needed) the Contractor, Construction Manager, Inspector, typically
discuss safety, three week look ahead, community public relations, payment applications, weekly statement of working days, submittals, RFI’s, change orders and other items as needed to effectively mange the construction project.

SCHEDULE CONTROL
Our construction support services team gives considerable attention to monitoring project schedules. We will coordinate, review and make recommendations for changes to the
Critical Path Method (CPM) schedule generated by the
contractor. As changes or discrepancies occur between the CPM schedule and as-built conditions, the contractor must implement corrective action and delays detailed out in a time-impact-analysis to validate the Contractor’s claim in schedule delays. We will review the contractor’s baseline schedule and monthly schedule updates to assure that the Contractor’s working schedule accurately reflects as-built conditions to date protecting RCMU from unsubstantiated time delays and time extension claims by the Contractor.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 1

5.2 CONSTRUCTION MANAGEMENT AND INSPECTION

Page 11550077 ends

COST CONTROL AND REPORTING
Cost control is a key element to successfully delivering a project and must be thoroughly integrated with other control methods (scope change control, schedule control and quality control) to assure that RCMU receives full value for funds earmarked for the project. Key elements of our cost control program include establishment of our internal budget as well as and maintenance of both our internal project budget and the Contractor’s bid. NV5 also offers value engineering and constructability reviews of project plans and specifications as an added value to ensure buildability and protection against unforeseen change orders that may be hidden in the project plans and specifications.

NV5 will additionally vet owner-requested or contractorgenerated changes first for entitlement, and second for validity of the costs including markup. Thorough a thorough review and evaluation of change order cost proposals,
close monitoring of force account work, including regular maintenance of a change order log, NV5 is able to protect RCMU against and mitigate unforeseen costs related to
the project. These and other items are often provided in a monthly status report to include work accomplished during the reporting period, work to be completed during the
next reporting period, budget and schedule status, and a summary of issues and concerns pending resolution.

DBE/SBE, GRANT AND LOAN COMPLIANCE
NV5 can provide labor compliance services to ensure
that federal and state prevailing wages regulations and requirements are performed/paid during the project’s
construction in compliance with Section 1770 et seq. and Davis-Bacon, State and Federal Funding, DBE/SBE, and
related requirements. NV5 understands that compliance
means adhering to strict federal and state regulations, particularly for projects funded by the US DOT, SRF, or EPA. Compliance requires maintaining certified vendor
participation (e.g., UCP database), passing good-faith effort (GFE) reviews, fulfilling reporting mandates, and avoiding the loss or delay of essential funding. This starts with the constructability review of RCMU’s front end bid specifications, where grant and loan requirements must be passed down to the Contractor at bid time.

During construction, specific grant and loan documents
require monthly submission with quarterly reports to the funding agency and NV5 can manage those activities for
RCMU. NV5 can assist RCMU to ensure maintenance of
complete record keeping including financial files (invoices, cancelled checks, contracts) and bidders lists throughout the duration of the grant or loan period.

INSPECTION QUALITY ASSURANCE AND

QUALITY CONTROL
To assure compliance with the plans and specifications, we will implement a comprehensive inspection quality assurance and quality control (QA/QC) program involving the following steps:
• We will perform a review of the contract documents. This responsibility typically includes the following tasks:
◦ Checking plans and specifications against
requirements that have been associated with issues
that occurred on similar jobs.
◦ Comparing existing elevations, grades and details,
etc., shown on plans with those at the actual site.
◦ Reporting errors, omissions and deficiencies, etc.,
to our Construction Manager, City, and engineering
design team for resolution.
◦ Keeping a marked-up set of plans and specifications
for quick reference.
◦ Anticipating the Contractor’s operations by reviewing the plans and specifications for each one before it
begins.
◦ Advance notification and coordination with City staff regarding key construction elements such as tie-ins,
shutdowns, startups, etc.
◦ NV5 will manage the Contractor’s advance
notification and coordination with other agencies
which could include other utility agencies, SCRRA,
BNSF, UUPR, adjacent cities, law enforcement
including City/CHP/Sheriff, Fire department, Transit,
Caltrans, County of San Bernardino or other City
departments.
• Before starting construction, we will discuss with the Contractor the definable features of work to assure that documentation is complete, materials are on hand and
those who are to perform the work, and the Contractor
and our inspectors understand the scope in its entirety including any permit requirements.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 2

5.2 CONSTRUCTION MANAGEMENT AND INSPECTION

Page 11550088 ends

• We will assure that the Contractor has an established safety program and that regular safety meetings are
conducted. We will also assure that the Contractor meets OSHA safety requirements.
• The construction inspector will perform follow-up
inspections on a daily basis for the purpose of assuring that the controls established during the initial inspection continue to provide work that conforms to the contract
requirements and applicable standards. Unsatisfactory
workmanship, materials and construction deficiencies
will be documented and reported immediately for future
identification and traceability. Notices of non-compliance will be issued to the Contractor and corrective and
preventive action will be taken to assure compliance with the contract documents.
• Our inspectors will conduct a monthly review of the asbuilt drawings and ensure that items are considered in the changes of the record drawings, including:
◦ The size, type and location of existing and new utility lines
◦ The layout and schematic drawings of electrical
circuits and piping
◦ Verification of alignment and cross sections
◦ Changes in the location of equipment, etc.
• NV5’s inspectors will review and approve the Contractor’s payment application for quantity validation prior to
being passed onto our Construction Manager for final
verification and recommendation to RCMU.
• Finally, we will review and approve the Contractor’s asbuilt drawings to complete the project turnover, filing the Notice of Completion, and begin the warranty period.
• NV5’s inspectors will utilize CMIS or RCMU’s approved documentation system for maintaining their daily
reports (Journals) which include labor and equipment
for DIR labor verification, detailed written description of work performed, visitors to the site, deficiencies, time and material construction activities, and other items
complete with photographs. At NV5, Inspectors Daily
Reports are done daily.

BEST MANAGEMENT PRACTICES
Our construction support services team is well-versed in National Pollutant Discharge Elimination System (NPDES) requirements and experienced in implementing best
management practices. We will monitor the implementation, maintenance and any required modification of the approved Stormwater Pollution Prevention Plan (SWPPP) and Water
Quality Management Plan (WQMP). In the event that the
project specifications for developing the SWPPP or WQMP are inadequate and cannot support the project needs or meet current NPDES requirements, we will work closely with the design consultants to incorporate the required provisions into the project specifications to meet these goals. Our team includes Qualified SWPPP Developers and Qualified SWPPP Practitioners.

WEB-BASED DOCUMENT CONTROL SYSTEM
NV5 is adaptable and can either utilize RCMU’s inspection software our web-based CMIS software that is custom
designed to provide the Construction Manager and RCMU
the capability to manage project information efficiently and effectively while maintaining full transparency to RCMU and to the design engineer in managing the construction contractor. NV5’s CMIS is available for use on NV5 projects, if authorized by RCMU to use for use with any project that NV5 is working on. What makes our system unique is that CMIS was designed and developed by Construction Managers
with collaboration from private and public agencies. NV5’s Construction Manager and inspector will have the realtime CMIS web-based software installed on their iPads and laptops, which can also be utilized on any device with internet access, including iPhone and Android mobile devices.

The CMIS system is transparent to RCMU, who can log in
and view at any time the Inspector’s Daily Reports, QA/QC Material reports, submittals, RFIs, correspondence, change orders, automated logs of submittals and RFIs, Working Day Statements, Contractor’s Pay Apps with DIR submissions and apprentice requirements documentation, and NV5 Inspection reports from any laptop, computer, iPad, iPhone, or Android device at any time. Additionally, our inspectors will send out supplementary email blasts noting elements of significance performed, along with photographs for a quick glance of work, enabling RCMU staff to immediately be up to date. At the end of the project, the data within the CMIS website will be downloaded for archival within 60 calendar days of the Notice of Completion.

Additionally, our inspectors can send out supplementary email blasts noting elements of significance performed, along with photographs for a quick glance of work, enabling City staff/Engineers to immediately be up to date.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 3

5.2 CONSTRUCTION MANAGEMENT AND INSPECTION

Page 11550099 ends

CUSTOMER SERVICE AND PUBLIC

OUTREACH
Our first line of customer service comes from our inspectors and Construction Managers. Our staff know the value of
maintaining great relations with residents, business owners and anyone affected by a project, and they have proven to be a valuable resource in appeasing public concerns and resolving field issues. Our goal is to handle public relations in the field with the inspector, and while keeping RCMU fully informed of the issues field management of public relations keeps these issues from escalating to RCMU Manager,
Mayor, or City Council levels.

An effective and informative public outreach program that informs affected residents, property owners and motorists about construction impacts and possible traffic delays is critical to the success of any project.

Key elements of our public outreach program include:
• Active listening to public concerns with follows-up by our Construction Inspectors and Construction Managers in
the field.
• Keeping RCMU informed of public concerns immediately
when they become evident during construction.
• Verbal and written notifications in advance of work
typically distributed by the Contractor in advance of work that affects the distribution area.
• Informational flyers about the project when required by our scope of work.
• Verbal/in-person communication follow-up to ease public concerns, enabling residents and business to prepare for any anticipated impact and address any public concerns.

City of Rancho Cucamonga Various On-Call Services| PP26826-0018464.00 NV5.COM | 4

5.2 CONSTRUCTION MANAGEMENT AND INSPECTION

Page 11551100 ends

PSA with Professional Liability Insurance (Non-Design) Page 1 Last Revised: 11/12/2020

AGREEMENT FOR

PROFESSIONAL SERVICES
THIS AGREEMENT is made and entered into this 1 day of August, 2026, by and between the City of Rancho Cucamonga, a municipal corporation (“City”) and TRC Solutions, Inc., a Corporation (“Consultant”).

RECITALS
A. City has heretofore issued its request for proposals to perform the following professional services: Construction Management and Inspection Support (“the Project”).

B. Consultant has submitted a proposal to perform the professional services described in Recital “A”, above, necessary to complete the Project.

C. City desires to engage Consultant to complete the Project in the manner set forth and more fully described herein.

D. Consultant represents that it is fully qualified and licensed under the laws of the State of California to perform the services contemplated by this Agreement in a good and professional manner.

AGREEMENT
NOW, THEREFORE, in consideration of performance by the parties of the mutual promises, covenants, and conditions herein contained, the parties hereto agree as follows:

1. Consultant’s Services.

1.1 Scope and Level of Services. Subject to the terms and conditions set forth in this Agreement, City hereby engages Consultant to perform all technical and professional services described in Recitals “A” and “B” above, including, but not limited to all aspects of construction management and inspection support, all as more fully set forth in the Consultant’s proposal, dated May 14, 2026 and entitled “Scope of Work”, attached hereto as Exhibit “A”, and incorporated by reference herein. The nature, scope, and level of the services required to be performed by Consultant are set forth in the Scope of Work and are referred to herein as “the Services.” In the event of any inconsistencies between the Scope of Work and this Agreement, the terms and provisions of this Agreement shall control.

1.2 Revisions to Scope of Work. Upon request of the City, the Consultant will promptly meet with City staff to discuss any revisions to the Project desired by the City. Consultant agrees that the Scope of Work may be amended based upon said meetings, and, by amendment to this Agreement, the parties may agree on a City of Rancho Cucamonga

CONTRACT NUMBER
2026-143
ATTACHMENT 5

Page 11551111 ends

PSA with Professional Liability Insurance (Non-Design) Page 2 Last Revised: 11/12/2020
revision or revisions to Consultant’s compensation based thereon. A revision pursuant to this Section that does not increase the total cost payable to Consultant by more than ten percent (10%) of the total compensation specified in Section 3, may be approved in writing by City’s City Manager without amendment.

1.3 Time for Performance. Consultant shall perform all services under this Agreement in a timely, regular basis consistent with industry standards for professional skill and care, and in accordance with any schedule of performance set forth in the Scope of Work, or as set forth in a “Schedule of Performance”, if such Schedule is attached hereto as Exhibit “A”.

1.4 Standard of Care. As a material inducement to City to enter into this Agreement, Consultant hereby represents that it has the experience necessary to undertake the services to be provided. In light of such status and experience, Consultant hereby covenants that it shall follow the customary professional standards in performing the Services.

1.5 Familiarity with Services. By executing this Agreement, Consultant represents that, to the extent required by the standard of practice, Consultant (a) has investigated and considered the scope of services to be performed, (b) has carefully considered how the services should be performed, and (c) understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. Consultant represents that Consultant, to the extent required by the standard of practice, has investigated any areas of work, as applicable, and is reasonably acquainted with the conditions therein. Should Consultant discover any latent or unknown conditions, which will materially affect the performance of services, Consultant shall immediately inform City of such fact and shall not proceed except at Consultant’s risk until written instructions are received from the City Representative.

2. Term of Agreement. The term of this Agreement shall be five (5) years and shall become effective as of the date of the mutual execution by way of both parties signature (the “Effective Date”). No work shall be conducted; service or goods will not be provided until this Agreement has been executed and above requirements have been fulfilled.

Parties to this Agreement shall have the option to renew in two (2) year increments to a total of seven (7) years, unless sooner terminated as provided in Section 14 herein.

Options to renew are contingent upon the City Manager’s approval, subject to pricing review, and in accordance with all Terms and Conditions stated herein unless otherwise provided in writing by the City.

3. Compensation.

3.1 Compensation. City shall compensate Consultant as set forth in Exhibit A, provided, however, that full, total and complete amount payable to Consultant shall not exceed $350,000 (Three Hundred Fifty Thousand Dollars), including all out of

Page 11551122 ends

PSA with Professional Liability Insurance (Non-Design) Page 3 Last Revised: 11/12/2020
pocket expenses, unless additional compensation is approved by the City Council. City shall not withhold any federal, state or other taxes, or other deductions. However, City shall withhold not more than ten percent (10%) of any invoice amount pending receipt of any deliverables reflected in such invoice. Under no circumstance shall Consultant be entitled to compensation for services not yet satisfactorily performed.

The parties further agree that compensation may be adjusted in accordance with Section 1.2 to reflect subsequent changes to the Scope of Services. City shall compensate Consultant for any authorized extra services as set forth in Exhibit A.

4. Method of Payment.

4.1 Invoices. Consultant shall submit to City monthly invoices for the Services performed pursuant to this Agreement. The invoices shall describe in detail the Services rendered during the period and shall separately describe any authorized extra services. Any invoice claiming compensation for extra services shall include appropriate documentation of prior authorization of such services. All invoices shall be remitted to the City of Rancho Cucamonga, California.

4.2 City shall review such invoices and notify Consultant in writing within ten (10) business days of any disputed amounts.

4.3 City shall pay all undisputed portions of the invoice within thirty (30) calendar days after receipt of the invoice up to the not-to-exceed amounts set forth in Section 3.

4.4 All records, invoices, time cards, cost control sheets and other records maintained by Consultant relating to services hereunder shall be available for review and audit by the City.

5. Representatives.

5.1 City Representative. For the purposes of this Agreement, the contract administrator and City’s representative shall be Trina Valdez, or such other person as designated in writing by the City (“City Representative”). It shall be Consultant’s responsibility to assure that the City Representative is kept informed of the progress of the performance of the services, and Consultant shall refer any decisions that must be made by City to the City Representative. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the City Representative.

5.2 Consultant Representative. For the purposes of this Agreement, Gelena Buford, Project Manager is hereby designated as the principal and representative of Consultant authorized to act in its behalf with respect to the services specified herein and make all decisions in connection therewith (“Consultant’s Representative”). It is expressly understood that the experience, knowledge, capability and reputation of the Consultant’s Representative were a substantial inducement for City to enter into this Agreement. Therefore, the Consultant’s Representative shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient

Page 11551133 ends

PSA with Professional Liability Insurance (Non-Design) Page 4 Last Revised: 11/12/2020
time to personally supervise the services hereunder. Consultant may not change the Responsible Principal without the prior written approval of City.

6. Consultant’s Personnel.

6.1 All Services shall be performed by Consultant or under Consultant’s direct supervision, and all personnel shall possess the qualifications, permits, and licenses required by State and local law to perform such Services, including, without limitation, a City business license as required by the City’s Municipal Code.

6.2 Consultant shall be solely responsible for the satisfactory work performance of all personnel engaged in performing the Services and compliance with the standard of care set forth in Section 1.4.

6.3 Consultant shall be responsible for payment of all employees’ and subcontractors’ wages and benefits, and shall comply with all requirements pertaining to employer’s liability, workers’ compensation, unemployment insurance, and Social Security. By its execution of this Agreement, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code that require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

6.4 Consultant shall indemnify, defend and hold harmless City and its elected officials, officers and employees, servants, designated volunteers, and agents serving as independent contractors in the role of city or agency officials, from any and all liability, damages, claims, costs and expenses of any nature to the extent arising from Consultant’s violations of personnel practices and/or any violation of the California Labor Code. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this Section 6.

7. Ownership of Work Product.

7.1 Ownership. All documents, ideas, concepts, electronic files, drawings, photographs and any and all other writings, including drafts thereof, prepared, created or provided by Consultant in the course of performing the Services, including any and all intellectual and proprietary rights arising from the creation of the same (collectively, “Work Product”), are considered to be “works made for hire” for the benefit of the City. Upon payment being made, and provided Consultant is not in breach of this Agreement, all Work Product shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Basic survey notes, sketches, charts, computations and similar data prepared or obtained by Consultant under this Agreement shall, upon request, be made available to City. None of the Work Product shall be the subject of any common law or statutory copyright or copyright application by Consultant. In the event of the return of any of the Work Product to Consultant or its

Page 11551144 ends

PSA with Professional Liability Insurance (Non-Design) Page 5 Last Revised: 11/12/2020
representative, Consultant shall be responsible for its safe return to City. Under no circumstances shall Consultant fail to deliver any draft or final designs, plans, drawings, reports or specifications to City upon written demand by City for their delivery, notwithstanding any disputes between Consultant and City concerning payment, performance of the contract, or otherwise. This covenant shall survive the termination of this Agreement. City’s reuse of the Work Product for any purpose other than the Project, shall be at City’s sole risk.

7.2. Assignment of Intellectual Property Interests: Upon execution of this Agreement and to the extent not otherwise conveyed to City by Section 7.1, above, the Consultant shall be deemed to grant and assign to City, and shall require all of its subcontractors to assign to City, all ownership rights, and all common law and statutory copyrights, trademarks, and other intellectual and proprietary property rights relating to the Work Product and the Project itself, and Consultant shall disclaim and retain no rights whatsoever as to any of the Work Product, to the maximum extent permitted by law.

City shall be entitled to utilize the Work Product for any and all purposes, including but not limited to constructing, using, maintaining, altering, adding to, restoring, rebuilding and publicizing the Project or any aspect of the Project.

7.3 Title to Intellectual Property. Consultant warrants and represents that it has secured all necessary licenses, consents or approvals to use any instrumentality, thing or component as to which any intellectual property right exists, including computer software, used in the rendering of the Services and the production of the Work Product and/or materials produced under this Agreement, and that City has full legal title to and the right to reproduce any of the Work Product. Consultant shall defend, indemnify and hold City, and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of city officials, harmless from any loss, claim or liability in any way related to a claim that City’s use is violating federal, state or local laws, or any contractual provisions, relating to trade names, licenses, franchises, patents or other means of protecting intellectual property rights and/or interests in products or inventions.

Consultant shall bear all costs arising from the use of patented, copyrighted, trade secret or trademarked documents, materials, software, equipment, devices or processes used or incorporated in the Services and materials produced under this Agreement. In the event City’s use of any of the Work Product is held to constitute an infringement and any use thereof is enjoined, Consultant, at its expense, shall: (a) secure for City the right to continue using the Work Product by suspension of any injunction or by procuring a license or licenses for City; or (b) modify the Work Product so that it becomes noninfringing. This covenant shall survive the termination of this Agreement.

8. Status as Independent Contractor. Consultant is, and shall at all times remain as to City, a wholly independent contractor. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act as an agent of City. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its officers, agents or

Page 11551155 ends

PSA with Professional Liability Insurance (Non-Design) Page 6 Last Revised: 11/12/2020
employees are in any manner employees of City. Consultant shall pay all required taxes on amounts paid to Consultant under this Agreement, and to defend, indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement.

Consultant shall fully comply with the workers’ compensation law regarding Consultant and Consultant’s employees.

9. Confidentiality. Consultant may have access to financial, accounting, statistical, and personnel data of individuals and City employees. Consultant covenants that all data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are confidential and shall not be disclosed by Consultant without prior written authorization by City. City shall grant such authorization if applicable law requires disclosure. All City data shall be returned to City upon the termination of this Agreement. Consultant’s covenant under this section shall survive the termination of this Agreement. This provision shall not apply to information in whatever form that is in the public domain, nor shall it restrict the Consultant from giving notices required by law or complying with an order to provide information or data when such an order is issued by a court, administrative agency or other legitimate authority, or if disclosure is otherwise permitted by law and reasonably necessary for the Consultant to defend itself from any legal action or claim.

10. Conflict of Interest.

10.1 Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the Services, or which would conflict in any manner with the performance of the Services. Consultant further covenants that, in performance of this Agreement, no person having any such interest shall be employed by it. Furthermore, Consultant shall avoid the appearance of having any interest, which would conflict in any manner with the performance of the Services.

Consultant shall not accept any employment or representation during the term of this Agreement which is or may likely make Consultant “financially interested” (as provided in California Government Code §§1090 and 87100) in any decision made by City on any matter in connection with which Consultant has been retained. Consultant or its employees may be required to disclose financial interests that may foreseeably be materially affected by the work performed under this Agreement pursuant to California Government Code § 87100 et seq and regulations promulgated by the Fair Political Practices Commission.

10.2 Consultant further represents that it has not employed or retained any person or entity, other than a bona fide employee working exclusively for Consultant, to solicit or obtain this Agreement. Consultant has not paid or agreed to pay any person or entity, other than a bona fide employee working exclusively for Consultant, any fee, commission, gift, percentage, or any other consideration contingent upon the execution of this Agreement. Upon any breach or violation of this warranty, City shall have the right, at its sole and absolute discretion, to terminate this Agreement without further liability, or

Page 11551166 ends

PSA with Professional Liability Insurance (Non-Design) Page 7 Last Revised: 11/12/2020
to deduct from any sums payable to Consultant hereunder the full amount or value of any such fee, commission, percentage or gift.

10.3 Consultant has no knowledge that any officer or employee of City has any interest, whether contractual, noncontractual, financial, proprietary, or otherwise, in this transaction or in the business of Consultant, and that if any such interest comes to the knowledge of Consultant at any time during the term of this Agreement, Consultant shall immediately make a complete, written disclosure of such interest to City, even if such interest would not be deemed a prohibited “conflict of interest” under applicable laws as described in subsection 10.1.

11. Indemnification.

11.1 Professional Services. In connection with its professional services, the Consultant shall defend, hold harmless and indemnify City, and its elected officials, officers, employees, servants, volunteers, and agents serving as independent contractors in the role of city or agency officials, (collectively, “Indemnitees”), with respect to any and all damages, liabilities, losses, reasonable defense costs or expenses (collectively, “Claims”), including but not limited to liability for death or injury to any person and injury to any property, to the extent the same out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant or any of its officers, employees, subcontractors, consultants, or agents in the performance of its professional services under this Agreement. Consultant shall reimburse all reasonable defense costs and expenses, including actual attorney’s fees and experts’ costs incurred in connection with such defense.

11.2 Other Indemnities. In connection with all Claims not covered by Section 11.1, the Consultant shall defend, hold harmless and indemnify the Indemnitees with respect to any and all Claims including but not limited to Claims relating to death or injury to any person and injury to any property, which arise out of, pertain to, or relate to the non-professional acts, omissions, activities or operations of Consultant or any of its officers, employees, subcontractors, consultants, or agents in the performance of this Agreement. Consultant shall defend Indemnitees in any action or actions filed in connection with any such Claims with counsel of City’s choice, and shall pay all costs and expenses, including actual attorney’s fees and experts’ costs incurred in connection with such defense.

11.3 Nonwaiver of Rights. Indemnitees do not, and shall not, waive any rights that they may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement.

11.4 Waiver of Right of Subrogation. Except as otherwise expressly provided in this Agreement, Consultant, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Consultant.

Page 11551177 ends

PSA with Professional Liability Insurance (Non-Design) Page 8 Last Revised: 11/12/2020

11.5 Survival. The provisions of this Section 11 shall survive the termination of the Agreement and are in addition to any other rights or remedies which Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against Consultant shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision.

12. Insurance.

12.1 Liability Insurance. Consultant shall procure and maintain in full force and effect for the duration of this Agreement, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the services hereunder by Consultant, and/or its agents, representatives, employees and subcontractors.

12.2 Minimum Scope of Insurance. Unless otherwise approved by City, coverage shall be at least as broad as:
(1) Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001).
(2) Insurance Services Office form number CA 0001 (Ed.
1/87) covering Automobile Liability, code 1 (any auto). (3) Worker’s Compensation insurance as required by the State of California, and Employer’s Liability Insurance.
(4) Professional Liability insurance in a form approved by the City, having an extended reporting period of not less than three (3) years; or Professional Liability insurance shall be maintained for a period of three (3) years after completion of the Services which shall, during the entire three (3) year period, provide protection against claims of professional negligence arising out of Consultant’s performance of the Services and otherwise complying with all applicable
provisions of this Section 13. Either policy shall be
endorsed to include contractual liability to the extent insurable.

12.3 Minimum Limits of Insurance. Consultant shall maintain limits no less than:
(1) Commercial General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage.

Commercial General Liability Insurance with a general
aggregate limit shall apply separately to this Agreement or

Page 11551188 ends

PSA with Professional Liability Insurance (Non-Design) Page 9 Last Revised: 11/12/2020
the general limit shall be twice the required occurrence limit.
(2) Automobile Liability: $2,000,000 per accident for bodily injury and property damage.
(3) Employer’s Liability: $1,000,000 per accident and in the aggregate for bodily injury or disease and Workers’
Compensation Insurance in the amount required by law.
(4) Professional Liability: $1,000,000 per claim/aggregate.

12.4 Deductibles and Self-Insured Retentions. Any deductibles or selfinsured retentions must be declared to and approved by the City.

12.5 Other Insurance Provisions.
(1) The commercial general liability and automobile liability policies are to contain the following provisions on a
separate additionally insured endorsement naming the City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of city or agency officials, are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Consultant; products and completed
operations of Consultant; premises owned, occupied or
used by Consultant; and/or automobiles owned, leased,
hired or borrowed by Consultant. The coverage shall
contain no limitations on the scope of protection afforded to City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City or agency officials which are not also limitations applicable to the named insured.
(2) For any claims related to this Agreement, Consultant’s insurance coverage shall be primary insurance as respects City, its officers, officials, employees, designated
volunteers and agents serving as independent contractors in the role of city or agency officials. Any insurance or selfinsurance maintained by City, their officers, officials, employees, designated volunteers or agents serving as
independent contractors in the role of city or agency
officials shall be excess of Consultant’s insurance and shall not contribute with it.
(3) Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought,
except with respect to the limits of the insurer’s liability.

Page 11551199 ends

PSA with Professional Liability Insurance (Non-Design) Page 10 Last Revised: 11/12/2020
(4) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled except after 30 days prior written notice by first class mail has been given to City (ten (10) days prior written notice for non-payment of premium). Consultant shall provide thirty (30) days written notice to City prior to implementation of a reduction of limits or material change of insurance
coverage as specified herein.
(5) Each insurance policy, required by this clause shall expressly waive the insurer’s right of subrogation against City and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of city or agency
officials.
(6) Be issued by an insurance company approved in writing by City, which is admitted and licensed to do business in the State of California and which is rated A:VII or better
according to the most recent A.M. Best Co. Rating
Guide.
(7) Specify that any failure to comply with reporting or other provisions of the required policy, including breaches of warranty, shall not affect the coverage required to be
provided.
(8) Specify that any and all costs of adjusting and/or defending any claim against any insured, including court costs and attorneys' fees, shall be paid in addition to and shall not deplete any policy limits.
(9) Other required insurance, endorsements, or exclusions as required by the City in any request for proposals applicable to this Agreement.

12.6 Evidence of coverage.Prior to commencing performance under this Agreement, the Consultant shall furnish the City with certificates and original endorsements, or copies of each required policy, effecting and evidencing the insurance coverage required by this Agreement. The endorsements shall be signed by a person authorized by the insurer(s) to bind coverage on its behalf. All endorsements or policies shall be received and approved by the City before Consultant commences performance.

If performance of this Agreement shall extend beyond one year, Consultant shall provide City with the required policies or endorsements evidencing renewal of the required policies of insurance prior to the expiration of any required policies of insurance.

Page 11552200 ends

PSA with Professional Liability Insurance (Non-Design) Page 11 Last Revised: 11/12/2020

13. Cooperation. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation that City might require. City shall compensate Consultant for any litigation support services in an amount to be agreed upon by the parties.

14. Termination. City shall have the right to terminate this Agreement at any time for any or no reason on not less than ten (10) days prior written notice to Consultant. In the event City exercises its right to terminate this Agreement, City shall pay Consultant for any services satisfactorily rendered prior to the effective date of the termination, provided Consultant is not then in breach of this Agreement. Consultant shall have no other claim against City by reason of such termination, including any claim for compensation. City may terminate for cause following a default remaining uncured more than five (5) business days after service of a notice to cure on the breaching party.

Consultant may terminate this Agreement for cause upon giving the City ten (10) business days prior written notice for any of the following: (1) uncured breach by the City of any material term of this Agreement, including but not limited to Payment Terms; (2) material changes in the conditions under which this Agreement was entered into, coupled with the failure of the parties to reach accord on the fees and charges for any Additional Services required because of such changes.

15. Notices. Any notices, bills, invoices, or reports authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Consultant’s and City’s regular business hours; or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses set forth in this section, or to such other addresses as the parties may, from time to time, designate in writing pursuant to the provisions of this section.

All notices shall be addressed as follows:

If to City: City of Rancho Cucamonga
Attn: RCMU
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
If to Consultant: Gelena Buford, Project Manager
TRC Solutions, Inc.
6 Executive Circle, Suite 200
Irvine, CA 92614

16. Non-Discrimination and Equal Employment Opportunity. In the performance of this Agreement, Consultant shall not discriminate against any employee, subcontractor, or applicant for employment because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation. Consultant will take affirmative action to ensure that subcontractors and applicants are employed, and that employees are treated during

Page 11552211 ends

PSA with Professional Liability Insurance (Non-Design) Page 12 Last Revised: 11/12/2020
employment, without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation.

17. Assignment and Subcontracting. Consultant shall not assign or transfer any interest in this Agreement or subcontract the performance of any of Consultant’s obligations hereunder without City’s prior written consent. Except as provided herein, any attempt by Consultant to so assign, transfer, or subcontract any rights, duties, or obligations arising hereunder shall be null, void and of no effect. 18 Compliance with Laws. Consultant shall comply with all applicable federal, state and local laws, ordinances, codes and regulations in force at the time Consultant performs the Services.

19. Non-Waiver of Terms, Rights and Remedies. Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default.

20. Attorney’s Fees. In the event that either party to this Agreement shall commence any legal action or proceeding to enforce or interpret the provisions of this Agreement, the prevailing party in such action or proceeding shall be entitled to recover its costs of suit, including reasonable attorney’s fees and costs of experts.

21. Exhibits; Precedence. All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail.

22. Applicable Law and Venue. The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California. Venue for any action relating to this Agreement shall be in the San Bernardino County Superior Court.

23. Construction. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement.

24. Entire Agreement. This Agreement consists of this document, and any other documents, attachments and/or exhibits referenced herein and attached hereto, each of which is incorporated herein by such reference, and the same represents the entire and integrated agreement between Consultant and City. This Agreement supersedes all prior

Page 11552222 ends

PSA with Professional Liability Insurance (Non-Design) Page 13 Last Revised: 11/12/2020
oral or written negotiations, representations or agreements. This Agreement may not be amended, nor any provision or breach hereof waived, except in a writing signed by the parties which expressly refers to this Agreement.

IN WITNESS WHEREOF, the parties, through their respective authorized representatives, have executed this Agreement as of the date first written above.

Consultant Name: TRC Solutions, Inc.

By: ______________________________
Name Date
______________________________
Title
City of Rancho Cucamonga

By:________________________________
Name Date
_________________________________
Title
By: ______________________________
Name Date

______________________________
Title
City of Rancho Cucamonga

By:________________________________
Name Date
_________________________________
Title
(two signatures required if corporation)

Page 11552233 ends

PSA with Professional Liability Insurance (Non-Design) Page 14 Last Revised: 11/12/2020

EXHIBIT A

SCOPE OF SERVICES

Page 11552244 ends
Page 11552255 ends

Rancho Cucamonga Municipal Utility (RCMU)
Various On-Call Services | Invitation #: SOQ #25/26-501

5.2 Construction Management and Inspection
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 1

1. Construction Management and Inspection

1.1. Construction Management Services
As the Construction Manager (CM), we will serve as the central point of oversight and integration for all construction activities. Our approach ensures alignment across all project functions, including mobilization, safety, environmental compliance, quality assurance/quality control, inspections, and commercial management. Below is a detailed outline of our construction management services:
 Construction Start-Up:
o Facilitate project initiation, including a comprehensive review of drawings and specifications
o Coordinate testing service requirements to validate project readiness o Verify that all necessary permits, approvals, and authorizations are in place prior to construction
o Conduct a detailed overview of drawings and specifications to identify potential issues and align with project goals
 Testing Services:
o Coordinate and oversee testing services to confirm compliance with project requirements and specifications
 Subcontractor Oversight:
o Monitor and coordinate subcontractor activities to align with project scope, schedule, and quality expectations
o Provide oversight to confirm subcontractor adherence to project-specific requirements and standards
 Safety Oversight:
o Conduct Project Plan Safety Assessment (PPSA) reviews and monitor adherence throughout the project lifecycle
o Review daily tailboard/safety meetings for compliance with safety protocols o Perform safety audits, inspections, and reviews, including paired safety audits with the Owner/Contractor
o Manage incident response and resolution, exercising Stop Work Authority when necessary to address safety concerns
 Environmental Compliance:
o Review construction activities for compliance with environmental regulations, permits, and project-specific requirements
o Coordinate with relevant agencies to address environmental concerns and meet regulatory requirements
 Communication, Documentation, and Reporting:
o Prepare and submit daily construction reports, weekly reports, and three-week lookahead schedules to provide stakeholders with timely updates o Maintain site document control to organize and track project documentation accurately o Facilitate communication between the City, contractors, and stakeholders to address project needs and resolve issues promptly
 Quality Assurance and Quality Control:
o Develop and implement project-specific QA/QC plans, particularly for electrical systems o Review drawings, specifications, submittals, and Inspection & Test Plans (ITPs) for compliance with project requirements

Page 11552266 ends

Rancho Cucamonga Municipal Utility (RCMU)
Various On-Call Services | Invitation #: SOQ #25/26-501

5.2 Construction Management and Inspection
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 2 o Verify materials and equipment meet project standards and specifications o Inspect installations, including cable routing, terminations, grounding systems, and panels, for adherence to approved construction methods
o Perform and witness testing activities, including insulation resistance, continuity, functional testing, and loop checks
o Document and track non-conformances, managing corrective actions promptly to maintain project quality
o Prepare detailed inspection reports for critical activities and project milestones o Maintain QA/QC documentation, reports, and as-built records to support project tracking and closeout

SCHEDULES
The successful delivery of a construction project depends significantly on the effectiveness of upfront planning and the continuous monitoring and control of the construction schedule throughout execution.
 Maintain real-time schedule updates based on field conditions and actual progress  Conduct schedule review and coordination meetings as needed to address impacts, adjustments, and upcoming work activities

PROJECT CLOSEOUT
Contract completion and closeout are critical elements of a construction project. Attention to detail at this point is essential. As the work diminishes, it must be expected that the number of people on the project will be reduced. The CM will ensure there is clearly defined closeout plan and procedure in place to allow the remaining staff to close out a project efficiently and effectively. The CM shall insist that the non-conforming work be corrected as soon as possible. This will avoid a buildup of punch list items at the end of a project. Also, updating the as-built drawings as the work progresses avoids delays at the closeout caused by the late delivery of the as-built drawings.  Develop and implement a comprehensive closeout strategy to support efficient project completion and turnover
 Proactively manage and resolve non-conforming work to minimize punch list accumulation and delays
 Track and drive punch list item completion throughout the project lifecycle to ensure readiness for final acceptance
 Maintain up-to-date as-built documentation during construction to prevent closeout delays  Coordinate final inspections, testing, and documentation to facilitate a smooth and timely project handover

1.2. Inspection Services
TRC provides comprehensive inspection services to confirm that all construction activities conform to project documents and meet the City of Rancho Cucamonga’s specific requirements. TRC utilizes the City’s inspection software or an agreed-upon reporting process to deliver detailed and accurate documentation. Below is a detailed outline of TRC’s inspection services:
 Compliance Verification:
o TRC reviews permits, right-of-way access, traffic control plans, and environmental compliance to validate adherence to regulatory and project-specific standards o Job-site conditions are documented in alignment with OSHA requirements and the SiteSpecific Safety Plan

Page 11552277 ends

Rancho Cucamonga Municipal Utility (RCMU)
Various On-Call Services | Invitation #: SOQ #25/26-501

5.2 Construction Management and Inspection
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 3  Construction Observation:
o Structure and pole locations are assessed to confirm staking matches design drawings and survey data
o Foundations or pole settings are inspected for depth, alignment, backfill, and compaction to verify proper installation
o Poles and towers are evaluated for plumb alignment and adherence to specified tolerances.
o Installation of crossarms, brackets, and structural hardware is reviewed for accuracy and functionality
o Insulators, fittings, and assemblies are verified for correctness and damage-free condition.
o Conductor and wire specifications, including shield/neutral, are confirmed to align with design requirements
o Stringing operations are monitored to mitigate conductor damage and validate sag, tension, and required clearances
o Grounding and bonding systems are reviewed for compliance with project specifications and industry standards
 Coordination and Meetings:
o TRC coordinates special inspections and material testing with representatives from other agencies as required.
o Field inspection tools are provided, with capabilities compatible with the City’s inspection software, if applicable.
 Documentation and Reporting:
o TRC maintains detailed inspection records, including photos and as-built documentation, to support project tracking and closeout.
o Daily journals and reports are prepared, outlining work performed, crew activity, and site conditions.
o Procedures are developed to oversee contractor compliance with federal and state prevailing wage regulations and requirements.
 DBE/SBE and Grant/Loan Compliance
o TRC monitors and documents DBE/SBE compliance and grant/loan requirements as applicable to the project scope.
 Field Inspection Tools
o TRC provides field inspection tools and capabilities compatible with the City’s inspection software, if applicable.

1.3. Survey Services
TRC delivers comprehensive land surveying solutions that drive the success to the full breadth of energy and infrastructure projects from oil, gas, and electric power to renewable generation, biofuels, carbon capture, and emerging clean energy technology projects nationwide.

Our licensed Professional Land Surveyors, experienced field teams, survey subcontractors and national approach ensure rapid mobilization, consistent quality, and project-specific expertise.

Whether supporting a multi-state pipeline corridor, a grid modernization program, or a renewable energy development, TRC provides Traceable, Verifiable, and Complete (TVC) data that supports safe, compliant, and efficient project execution from initial planning through post-construction recordkeeping.

Page 11552288 ends

Rancho Cucamonga Municipal Utility (RCMU)
Various On-Call Services | Invitation #: SOQ #25/26-501

5.2 Construction Management and Inspection
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 4 Specialized Surveying Services:
 Boundary, Easement, and ALTA/NSPS Land Title Surveys
 Topographic and Geodetic Control Surveys
 Construction Staking & Layout
 As-Built and Post-Construction Surveys
 Utility Locating and Mapping (ASCE 38-22 SUE)
 Route, Corridor, Plan & Profile, and HDD Crossing Surveys  High-Definition Survey (HDS) Terrestrial Laser Scanning and Modeling  Unmanned Aerial Mapping UAV/Drone LiDAR & Photogrammetry  Remote and vessel Hydrographic & Bathymetric Surveys
 Material Traceability and Tracking
 Mapping & Field Data Collection, GIS Support
 Class Location & High Consequence Area (HCA) Surveys
 Environmental & Wetland Delineation Survey Support
 Emergency & Disaster Response Surveys

Page 11552299 ends
Page 11553300 ends
Page 11553311 ends

6 Executive Circle
Suite 200
Irvine, CA 92614
t 949.727.9336

© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990

1. Cover Letter
May 14, 2026
Chris Beeman
Deputy Director of Electric Utility Services
Rancho Cucamonga Municipal Utility
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Subject: SOQ # 25/26-501: RCMU - Various On-Call Services SOQ TRC Proposal No. 000735660.9990.0000
Dear Mr. Beeman:

TRC Solutions, Inc. (TRC) is pleased to respond to the Rancho Cucamonga Municipal Utility (RCMU) Various On-Call Services SOQ. TRC is well-positioned to provide exceptional resources and tailored solutions to support the diverse on-call services required by RCMU.

At TRC, we take pride in delivering comprehensive solutions that prioritize safety, reliability, and innovation. Our expertise includes:
 Substation Experience: TRC has completed a wide range of substation upgrade projects, including relay replacements, protection system enhancements, and control building installations.

Our team brings extensive experience in designing, engineering, and implementing solutions that improve system reliability and operational efficiency.
 Distribution Expertise: Our engineering team is supported by a fully integrated group specializing in transmission, substation, testing and commissioning, project management, construction management, integrated grid planning, and field services. Our team delivers tailored solutions for optimizing grid performance, modernizing infrastructure, and integrating new technologies.
 Commitment to Quality: We follow IEEE/NESC industry standards and utility-specific requirements, conducting thorough reviews and quality checks at every stage of the project to deliver work of the highest quality.
 Local Presence: Our Irvine, CA office serves as the main local resource, providing quick responses and direct access to experts, supported by a nationwide network to meet project needs efficiently.
 Safety First: Safety is at the core of everything we do. TRC prioritizes safety through rigorous protocols, regular training, audits, and risk assessments to protect our team, your personnel, and infrastructure.
 Innovative Solutions: TRC leverages advanced technologies and strategies to deliver modernized grids and sustainable energy solutions, helping RCMU adapt to the evolving energy landscape.

With this depth of expertise, local presence, and commitment to excellence, TRC is ready to deliver value and reliability to RCMU on every project. We appreciate your consideration of our response and look forward to the opportunity to strengthen our partnership. Please feel free to contact me at (602) 770-2287 or via email at [email protected] if you have any questions or need further information.

Sincerely,
Gelena Buford
Associate Project Manager
(602) 770-2287

Page 11553322 ends
Page 11553333 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 ii

2. Table of Contents

1. Cover LeƩer .................................................................................................................. i

2. Table of Contents ......................................................................................................... ii

3. ExecuƟve Summary ..................................................................................................... 1

4. Firm Experience/QualificaƟons .................................................................................... 3

4.1. Firm QualificaƟons ......................................................................................................... 3

4.2. Project Experience ......................................................................................................... 6

4.3. Firm InformaƟon .......................................................................................................... 10

5. Third Party/Subcontractors ........................................................................................ 12

6. Staff Resumes and OrganizaƟon Chart ....................................................................... 13

7. Project Management Approach.................................................................................. 16

8. Quality Management System ..................................................................................... 18

9. Appendix A: Staff Resumes ........................................................................................ 20

Page 11553344 ends
Page 11553355 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 1

3. Executive Summary
TRC is pleased to submit our Statement of
Qualifications (SOQ) to the Rancho Cucamonga
Municipal Utility (RCMU) for the Various On-Call
Services contract. With over 57 years of experience
in engineering, consulting, and construction
management, TRC is well-equipped to deliver the
high-quality, responsive, and practical solutions
RCMU requires. Our team is committed to
supporting RCMU’s mission by providing innovative
and cost-effective services that align with the City’s
goals and priorities.

Approach
TRC’s approach is centered on collaboration,
efficiency, and technical excellence. For this
contract, we will provide comprehensive electrical
engineering design and support services, including
plan checks, cost estimating, and detailed designs
for new distribution lines and service extensions.

Our team will also deliver construction management
and inspection services, with a focus on safety,
efficiency, and compliance with all applicable
regulations. We are prepared to act as a liaison
between RCMU, developers, and contractors,
facilitating smooth communication and coordination
throughout all project phases. Additionally, we are
ready to assist during outages and emergency
situations, providing timely and effective support to
reduce disruptions.

Qualifications
TRC is a nationally recognized firm with a multidisciplinary team of over 7,500 professionals. Our expertise spans electrical engineering, construction management, and environmental services, making us a trusted partner for utilities, developers, and government agencies. We have worked on similar projects for municipalities and utilities across California and Arizona, demonstrating our ability to manage complex projects and deliver results that exceed client expectations.

Experience
Our team has extensive experience in electrical engineering design and construction management, including:
 Designing and managing distribution line projects for utilities in California and Arizona.  Acting as a liaison between municipalities, developers, and contractors to streamline project delivery.  Providing emergency response support during outages, ensuring rapid restoration of services.  Managing construction activities, including RFIs, submittals, and change orders, to keep projects on schedule and within budget.

Availability of Staff
TRC has a dedicated team of professionals ready to support RCMU’s projects. Our team includes experienced project managers, engineers, and construction inspectors who are familiar with the unique requirements of utility projects in California. We have carefully assessed our current workload and are confident in our ability to allocate the necessary resources to RCMU without compromising the quality

Page 11553366 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 2 or timeliness of our services. Additionally, our regional presence in California and Arizona allows us to provide responsive, on-the-ground support as needed.

Regional Presence
With offices in California and Arizona, TRC is strategically positioned to support RCMU’s projects. Our proximity to Rancho Cucamonga allows us to quickly deploy staff to project sites, attend meetings, and address any issues that may arise. This regional presence, combined with our deep understanding of local regulations and utility requirements, enables us to deliver efficient and effective solutions tailored to RCMU’s needs.

Commitment to RCMU
TRC is committed to delivering safe, functional, and cost-effective designs that meet RCMU’s goals. If awarded this contract, we will focus on reducing construction and material costs, incorporating design efficiencies, and providing exceptional service at every stage of the project. We look forward to the opportunity to collaborate with RCMU and contribute to the success of your projects.

Page 11553377 ends
Page 11553388 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 3

4. Firm Experience/Qualifications

4.1. Firm Qualifications
Distribution Engineering
TRC delivers comprehensive engineering, technical support, and environmental compliance services for major utility distribution systems. We have a strong history of supporting large-scale infrastructure projects, including simple anchor and full pole replacements, complex overhead-to-underground (OHto-UG) conversions, and high-profile wildfire hardening initiatives. Our multidisciplinary approach covers all aspects of project delivery, from initial surveying and field data collection to detailed engineering and design, environmental permitting, cost estimation, and construction management.

Core Expertise & Services
Our engineering teams are proficient in utilizing advanced modeling and design tools, including PLSCADD, OCalc, and LiDAR data integration. We specialize in:
 System Hardening & Undergrounding: Extensive experience designing and managing OH-to-UG conversions, complex overhead reconductoring, and voltage conversions to improve system reliability and mitigate fire risks.
 Structural Analysis & Compliance: Executing comprehensive Pole Loading Compliance Programs, conducting voltage drop and flicker studies, developing cable pulling calculations, and resolving GO95 infractions.
 Environmental & Regulatory Permitting: Conducting site investigations, verifying CEQA requirements, and securing critical permits from agencies such as the CPUC, California Coastal Commission, and local municipalities (including traffic control and right-of-way permits).  Data-Driven Assessments: Leveraging drone investigations and LiDAR modeling to assess distribution facilities in High Fire Threat Districts (HFTD) and design targeted mitigation repairs.

Representative Utility Experience
Our capacity to manage high-volume, critical infrastructure projects is demonstrated through our ongoing partnerships with major California utilities:
 Pacific Gas & Electric (PG&E): Delivered comprehensive engineering support for large-scale initiatives, including 168 miles of Wildfire Hardening (combining overhead rebuilds and OH-to-UG conversions), processing over 24,000 pole replacement and electric compliance tag orders, and managing thousands of new business connections and post-emergency estimates.  San Diego Gas and Electric (SDG&E): Served as a primary contractor for the Strategic Undergrounding (SUG) Program involving ~60 miles of conversion. We have also analyzed and designed over 4,500 poles for the Pole Loading Compliance Program, designed full structure replacements for the Drone Investigation, Assessment, and Repair (DIAR) program, and facilitated pole replacements and load analyses for ~6000 poles under the Fire Risk Mitigation (FIRM) program.

Substation Engineering
For over 25 years, TRC has been providing engineering design and construction support for electrical substations. Our power delivery engineering team, comprising over 400 professionals, offers comprehensive design and planning services for substation projects from 13kV to 500 kV. With experience in hundreds of successful projects, we are equipped to handle all aspects of switchyard and substation design.

Our services encompass the entire project lifecycle, including initial concept development, feasibility and planning studies, land acquisition, permitting, and complete civil, mechanical, and electrical design.

Page 11553399 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 4 Our experienced team can deliver fully completed facilities, ranging from switchyards to integrated and automated substations.

Our extensive substation and switchyard experience includes:
 Substation Design through 500 kV
 Foundation Design
 GIS & Open-Air Design
 Site Surveying
 Station Expansions and Upgrades
 Access Roads and Fencing
 Protection & Control Permitting
 Automation & Integration
 Structural Analysis
 SCADA System Design
 Telecommunications
 Testing & Commissioning
 Security
 Ground Grid Design
 3D Design
 Control House Design
 Spill Prevention, Control & Countermeasure
Plans (SPCC)
Our previous projects encompass a wide range of voltages, from distribution lines to high-voltage substations up to 500 kV. We have successfully completed design services, as well as testing and commissioning, for nearly every type of power system equipment, including transmission lines, power transformers, capacitors, substation buses, and generators.

Our team is proficient in both new and retrofit protection and control projects, possessing the skills, knowledge, and expertise to safely execute turnkey projects within the confines of an energized protection system. This extensive experience allows us to deliver reliable and efficient solutions that align with the specific requirements of each project.

Our design services and experience include the following:
 Conceptual Design
 Retrofit Projects
 Application Analysis
 Setting Calculations and Coordination
 Equipment Specification and Procurement
 RTU, DFR, SER Design and Programming
 Design Documents and Calculations
 Short Circuit Analysis and Modeling
 Facility and Compliance Studies
 Outage and Fault Analysis
 Detailed Schematics
 Detailed Wiring and Cable Design
 Relay and Control Cabinet Design
As-Built Documentation (Record Drawings)
 In addition to supporting project design, we have the experience to Incorporate changes from the construction contractor to furnish a complete set of drawings and documents that reflect the "asbuilt" condition.

Our current clients include utilities such as Silicon Valley Power, Riverside Public Utilities, Southern California Edison, Salt River Project, Arizona Public Service Utilities in the west region of US. And we also have experience working with many utilities across US including but not limited to Centerpoint, Entergy, American Electric Power, Baltimore Gas & Electric and Eversource Energy.

Testing & Commissioning
TRC provides utilities with skilled personnel to manage substation projects during the critical final steps before energization. Successful completion requires thorough planning and seamless coordination among teams. Guided by TRC’s commitment to safety and Human Performance practices, our professionals collaborate with Operations to schedule outages, review switching orders, and coordinate with other parties to secure essential resources, including materials, wiremen, relay technicians, and commissioning engineers. These resources are scheduled according to a pre-established plan before mobilizing to the job site.

Once on-site, TRC engineers work closely with wiremen and relay technicians to execute tasks including removals, installation of new devices and panels, relay setup, wiring checks, and functional

Page 11554400 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 4 checks for protective and SCADA circuits. TRC also provides utilities with commissioning engineers who determine when a new substation or modified equipment in an existing substation is ready for energization and can be handed over to the appropriate dispatch organization. These engineers develop detailed checklists, review and approve test results, create equipment energization plans to minimize system risk, build relay test plans, and provide final technical approval before releasing equipment to operations.

In addition, TRC employs highly skilled engineers and technicians who can fully commission both new and existing substations. These professionals are proficient in testing apparatus, relays, SCADA systems, and protection schemes using various software and test sets, ensuring the reliability and functionality of substation control systems.

Our capabilities include:
 Outage and Energization Planning
 Project Sequence Planning
 Project Commissioning Plan Development
 Isolation Planning
 Testing and Commissioning Oversight
 Relay testing
 Fully Integrated IEC 61850 substations
 Mid-Line Reclosers
 Line, Bus, Transformer, Generator,
Capacitor Bank Protection Schemes
 Fiber, Power Line Carrier and Other
Communication Assisted Schemes
 End-to-End Coordination Testing
 Maintenance Testing
 Full Acceptance testing
 Final Test Reports, Test Plans and Results
in Native Format
 Revenue Metering
 4kV Through 500kV Apparatus testing
Survey Services
TRC delivers comprehensive land surveying solutions that drive the success to the full breadth of energy and infrastructure projects from oil, gas, and electric power to renewable generation, biofuels, carbon capture, and emerging clean energy technology projects nationwide.

Our licensed Professional Land Surveyors, experienced field teams, survey sub-contractors and national approach ensure rapid mobilization, consistent quality, and project-specific expertise. Whether supporting a multi-state pipeline corridor, a grid modernization program, or a renewable energy development, TRC provides Traceable, Verifiable, and Complete (TVC) data that supports safe, compliant, and efficient project execution from initial planning through post-construction recordkeeping.

Survey data is downloaded and reviewed on a daily basis to maintain project schedules. Changes made to the raw survey data during processing are tracked, with an emphasis on transparency, integrity, and adherence to TRC’s strict safety protocols throughout the project. Our crews follow jobspecific safety plans and field procedures that protect personnel, the public, and the environment while ensuring high-quality data collection.

Construction Management
Construction Management Services
TRC's construction management services range from field inspection and construction quality control management to utility clearance holding and outage coordination, to construction contract and program administration. Whether TRC provides the full spectrum of construction management services or an augmentation to a client's staff, TRC stands ready to provide qualified personnel and perform the following type of services to meet our client's project requirements:

Page 11554411 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 5 Pre-Construction Activities: Construction Activities:
 Safety and QA/QC program development  Safety and QA/QC program implementation and management
 Constructability Reviews and design phase
services
 Clearance and Tag Holding
 Site assessments / conceptual design review  Contractor schedule development and management
 Contractor identification and vetting  Contract administration, including field contract/change order management
 RFP & bid package development and
implementation
 Specification conformance
 Project planning / outage planning  Project submittal coordination  Permitting  Materials management
 Construction kick-off  Project communication and reporting  Construction document control
 Environmental compliance
 Final design/as-built documentation
Field Inspection and QC Management:

TRC construction inspectors are trained and experienced providing inspection and quality control management services. Our inspectors have received training and certification in a wide range of construction materials standards and design specifications. They regularly provide project specification conformance oversight, working closely with either TRC in-house engineering, owner-provided engineering, or third-party engineers, assuring that construction specifications are met and that materials and products provided are acceptable. TRC inspectors routinely works with project engineers and constructors to provide an on-site, proactive service that minimizes project issues such as changing field conditions, unforeseen existing conditions, alternate materials applications and final conformance with the specification and contract intent. TRC Inspectors have the ability to administer the TRC
QA/QC program related to the specific discipline, or act as the owner's representative in the administration of an owner's required QA/QC program. Programs administered range in intensity from nuclear power plant in-house programs to simple materials inspection for small, municipal clients.

We can also provide storm/emergency outage services, which include "wire down" location services, right-of-way and structure inspections, and substation equipment condition inspections. Teaming with TRC emergency design resources, quick, safe solutions can be provided for any situation, greatly aiding the utility and their customers.

Representative Utility Experience
Our capacity to manage high-volume, critical infrastructure projects is demonstrated through our ongoing partnerships with major utilities:
 DFJV High Speed Rail Relocations (HSR): Delivered comprehensive construction management services for a high-speed rail program spanning 750 miles, including a 65-mile design-build segment with 120+ structures, resolving over 120 utility conflicts, and managing material procurement, storage, and controlled issuance to support corridor-wide relocations and interfaces.  Arizona Public Service (APS): Delivered Owner’s Engineering Agent services for APS, supporting development of two 500/230kV transmission lines (~35 miles) and two greenfield 500kV substations, advancing phased designs and overseeing EPC execution to deliver reliable integration, constructability, and system expansion near Gila Bend.

Page 11554422 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 6

4.2. Project Experience

DISTRIBUTION
Field Project 1 Project 2
Project Title Wildfire Hardening Estimating C233, MN: Cutover to C1023, LI Client/Agency Name Pacific Gas & Electric Company (PG&E) San Diego Gas & Electric Company (SDG&E) Contact Information
for Reference
Name/Title: Hossein Gharaviram
Phone: 925-999-0215
Email: [email protected]
Name/Title: Valorie Lancaster - DCA
Phone: (858) 437-1493
Email: [email protected]
Years of Work 2018 - Present 2025 - 2026
Brief Description of
Scope Performed
Performed detailed design and estimating work
for PG&E’s wildfire hardening program.

Deliverables included, complete estimate of labor
and materials, Pole loading calculations (PLC),
Cable Pull Calculations (CPC) CMCS (Circuit
Map Change Sheets), Key Sketches, detailed
construction sketches, Voltage drop/flicker
calculations, SCI (short circuit current) analysis,
plan and profile sheets and complete field survey
data for the required design work.

This project involved transferring load from
circuit C233 to C1023, incorporating both
underground and overhead components. To
accommodate the increased capacity on circuit
C1023, 16 spans of primary conductor were
upgraded to larger aluminum conductors, and
10 wood poles were replaced with steel poles to
meet SDG&E's fire hardening standards. Poles
were analyzed using PLS-CADD SAPS L4 finite
element analysis with LiDAR data. Key
deliverables included the PLS-CADD model,
pole loading calculations, construction drawings,
and labor/material estimates.

The underground scope focused on updating
circuit and facility maps to reflect the transfer of
C233 to C1023, including retagging structures
with the new circuit ID. Deliverables included
updated Summary Operating Maps,
Underground Circuit Maps, and labor/material
estimates. Overhead field data collection was
conducted by TRC using IKE survey, while
underground data collection was supported by
SDG&E QEWs.

Coordination with SDG&E Land Services
ensured compliance with land use restrictions
for new pole locations, while collaboration with
SDG&E environmental and archaeological
teams addressed potential impacts on the
environment and Native American cultural sites.

Key Team Members
Involved
Erik Arulf, Distribution Operations Supervisor,
Program Lead
Eugeno Ponce, Distribution Engineer IV, Primary
Engineer
Thomas Durso, Engineer III, Design Team Lead
and Lead Reviewer
Marshall Vaughan, Designer III, Lead PLSCADD Designer

Page 11554433 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 7 Field Project 3
Project Title New Business
Client/Agency Name Pacific Gas & Electric Company (PG&E) Contact Information
for Reference
Name/Title: Kimberly Payne
Phone: 661-619-4871
Email: [email protected]
Years of Work 2021 - Present
Brief Description of
Scope Performed
Performed full-scale engineering and estimating work for over 3500 new customer connection work orders. Each work order comprises performing load analysis on distribution level transformers to ensure overall voltage drop and flicker values stayed within limits when new load from new customers are added to the secondary line and transformers. If the new load fails voltage drop/flicker limits, full engineering work is performed to ensure voltage drop/flicker values remain within limits. Engineering work involves, splitting load into new transformers, installing new poles and secondary wires as needed, estimating labor and material costs, construction sketches, CMCS (Circuit Map Change Sheets), installing safety devices such as fuses, switches etc. and performing PLC (pole loading calculations) on new poles. These work orders were both overhead, underground, and at times a combination of both. Additionally, coordination with PG&E’s land survey and permitting departments were required to ensure easements and proper permits were in place before construction.

Key Team Members
Involved
Jarrod Tucker, Distribution Operations Supervisor, Program Lead Corley Faulkenberry, Distribution Designer II, Primary Designer

CONSTRUCTION MANAGEMENT
Field Project 1 Project 2
Project Title DFJV High Speed Rail Relocations APS Sundance to Milligan 230kV Client/Agency Name Dragados Flatiron Joint Venture Arizona Public Service Contact Information
for Reference
Name/Title: Daniel Van Groningen - Third Party Utility
Specialist
Phone: 559-246-2002
Email: [email protected]
Name/Title: Dusty Alook - T&D Project
Manager
Phone: 480-240-0122
Email: [email protected]
Years of Work 2019-2026 2025-Current
Brief Description of
Scope Performed
Relocation of Distribution and transmission lines in the path of the HSR 26 Mile New 230kv, 154 Steel Monopoles
Key Team Members
Involved
Drew Bernard – Sr. Construction Manager, CM Oversite
John Bernard Construction Manager, Lead construction
Manager – Transmission – Spec/Safety Compliance
Eden Ochoa – Civil Construction Manager, Lead
construction Manager Civil – Spec/Safety Compliance
Roger Branka – Materials Manager, Material Handler/
Procurement
Robert Brown – Sr. Construction
Manager, Safety/ Spec Compliance/
Oversite
Jevon Malcom, - Jr. Construction
Manager, Tracking task completion, Daily
reporting

Page 11554444 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 8

SUBSTATION
Field Project 1 Project 2
Project Title Randolph 500kV, 230kV & CEP stations Hunter Substation Replacement Project Client/Agency Name Salt River Project Riverside Public Utilities Contact Information
for Reference
Name/Title: Paul Rohr – Senior Engineer
Phone: 859-629-2026
Email: [email protected]
Name/Title: Raul Ramirez – Substation Principal
Engineer
Phone: 951-826-5833
Email: [email protected]
Years of Work 2023-2025 2025-2026
Brief Description of
Scope Performed
Designed two new greenfield 500kV substations.

Additionally, upgraded existing 230kV station’s
station service. Developed 5%, 30%, 60%, 90%,
& IFC packages for each discipline, including bill
of materials and vendor drawing reviews.

Reviewed design packages for new greenfield
substation in detail and provided physical,
protection & control, and civil/structural review
comments for 60%, 90%, & 100% packages.

Additionally, material and BOM were reviewed.

Key Team Members
Involved
John Stushek – Substation Lead
Jin Yoon – Civil Lead
Wayne Uyemura – Substation Engineer
Cole Pack – Substation Engineer
John Stushek – Substation Lead
Jin Yoon – Civil Lead
Wayne Uyemura – Substation Engineer
Project 3 Project 4
Project Title Alliance 69/34.5kV Substation Space Park Junction Client/Agency Name Salt River Project Silicon Valley Power Contact Information
for Reference
Name/Title: Gokul Kesavan – Engineering
Manager
Phone: 602-236-6075
Email: [email protected]
Name/Title: Krishn Patel – Senior Electric Utility
Engineer
Phone: 408-615-2728
Email: [email protected]
Years of Work 2025-2026 2024-2026
Brief Description of
Scope Performed
Designed new greenfield 69/34.5kV substation.

Coordinated distribution feeder conduit runs with
customer interconnection. Developed 5%, 30%,
60%, 90%, & IFC packages for each discipline.

Placed material orders within client’s SAP
system.

Acted as owner’s engineer for construction of a
greenfield 60kV substation. Reviewed physical
and civil/structural drawing packages and
calculations. Attended meetings with customer
and customer’s engineer to review design
progress. Responded to customer RFI’s and
provided direction. Additionally, provided design
and engineering services for protection and
controls upgrades (30%, 60%, 90%, & IFC
deliverable packages).

Key Team Members
Involved
John Stushek – Substation Lead
Petro Tzambourakis – Civil Lead
Wayne Uyemura – Substation Engineer
Cole Pack – Substation Engineer
John Stushek – Substation Lead
Adam Hunt – Civil Lead
Edras Lepe Zapata – Substation Engineer

Page 11554455 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 9

TESTING & COMMISSIONING
Field Project 1 Project 2
Project Title
DB 130 Davidson Ave Substation Testing and
Commissioning 3rd Party Commissioning
Inspection
Energizing the Future program (ETF)
Client/Agency Name San Francisco Public Utilities Commission First Energy Corp Contact Information
for Reference
Name/Title: Eric Gee – Construction Manager
Phone: 925-699-0704
Email: [email protected]
Name/Title: Frank Hartley
Phone: 724-244-1529
Email: [email protected]
Years of Work 2023 - Present Present
Brief Description of
Scope Performed
Coordinate and supervise all activities related to
commissioning the new 230kV GIS and 15kV
equipment. Major duties included reviewing
commission, energization, and isolation plans.

Witness testing activities, review test records, and
develop a punch list.

TRC provides skillful commissioning engineers
and startup coordinators with the required
education and experience to safely replace
outdated equipment and expand existing
substations and greenfield construction. Using a
human performance mindset, TRC employees
work together with internal and external
resources to complete projects safely and free
from defects to guarantee the integrity and
availability of the transmission.

Key Team Members
Involved
Kenneth Standley – Commissioning Inspector
James Heaton – Commissioning Inspector
Diego Feo-Mendez – Commissioning Inspector
Seth Kreider – Regional Supervisor

SURVEY SERVICES
Field Project 1 Project 2
Project Title SVP Survey Support AECOM – SDG&E Strategic Undergrounding Program (SUG)
Client/Agency Name Silicon Valley Power (SVP) AECOM
Contact Information
for Reference
Name/Title: SVP
Phone: (408) 261-5292
Email: [email protected]
Name/Title: Francisco Fierro - Senior Survey
Manager
Phone: 270-331-8340
Email: [email protected]
Years of Work Present 2024-2025
Brief Description of
Scope Performed
Survey Project Management and progress
reporting, licensed surveyor oversight, managing
and scheduling survey
Survey Project Management and progress
reporting, licensed surveyor oversight,
managing and scheduling survey and SUE
services and subcontractors for land surveying,
base-mapping, ortho-imagery, topographic
maps.

Key Team Members
Involved
Regan Verhland, PLS Survey Manager
Grant Harrington, PLS Sr. Director National
Practice Leader
Regan Verhland, PLS Survey Manager
Grant Harrington, PLS Sr. Director National
Practice Leader

Page 11554466 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 10

4.3. Firm Information
Firm History and Organizational Structure
TRC has been a trusted leader in construction management, testing and commissioning, substation, distribution, and field services for over 57 years. TRC Solutions, Inc., established as a corporation in 1981, is dedicated to delivering innovative, high-quality solutions tailored to the needs of our clients.

Our history is built on a foundation of integrity, excellence, and a commitment to driving success in the industry.

California Presence
TRC has built a strong footprint across California, with offices strategically positioned throughout the state to provide direct access and responsive support to our clients and their projects. This network of locations allows us to stay connected to the communities we serve and deliver solutions that meet the unique demands of California-based initiatives. Below is a list of our California office locations.

Office Location Address Phone Number
Bakersfield 2820 Pegasus Dr., Bakersfield, CA 93308 T 661.399.1398 Concord 1850 Gateway Blvd., Ste. 1075, Concord, CA 94520 T 510.431.8383 Encinitas 527 Encinitas Blvd., Ste. 103, Encinitas, CA 92024 T 916.962.7001 Fresno 8050 N. Palm Ave., Ste. 300, Fresno, CA 93711 T 559.439.2576 Irvine 6 Executive Cir., Ste. 200, Irvine, CA 92614 T 949.727.9336 Los Angeles 6121 Sunset Blvd., Studio 203, Los Angeles, CA 90028 T 213.213.9400 Santa Clara 2045 Martin Ave., Ste. 202, Santa Clara, CA 95050 T 650.967.2365

Page 11554477 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 11 Office Location Address Phone Number
Oakland 436 14th St., Ste. 1020, Oakland, CA 94612 T 916.962.7001 Ontario 3237 East Guasti Rd., Ste. 230, Ontario, CA 91761 T 949.390.2860 Orange 725 W Town & Country Rd., Ste. 140, Orange, CA 92868 T 949.390.2860 Rancho Cordova 10680 White Rock Rd., Ste. 100, Rancho Cordova, CA 95670 T 916.366.0632
Riverside 1935 Chicago Ave., Ste. A, Riverside, CA 92501 T 951.788.6028 Rocklin 6030 West Oaks Blvd., Ste. 180, Rocklin, CA 95765 T 949.727.9336 Sacramento 3947 Lennane Dr., Ste. 130, Sacramento, CA 95834 T 949.727.9336 San Diego 4393 Viewridge Ave., Ste. A, San Diego, CA 92123.1619 T 858.505.8881 San Francisco 600 California St., Ste. 11018, San Francisco, CA 94108 T 833.987.7283 San Luis Obispo 872 Higuera St., San Luis Obispo, CA 93401 T 510.431.8383 Santa Monica 2601 Ocean Park Blvd., Ste. 100, Santa Monica, CA 90405 T 949.727.9336 San Ramon 6111 Bollinger Canyon Rd., Ste. 525, San Ramon, CA 94583 T 925.968.4100 Santa Ana 1711 Newport Cir., Santa Ana, CA 92705 T 714.437.1564 Santa Ana (Hutton
Centre) 6 Hutton Centre Dr., Ste. 450, Santa Ana, CA 92707 T 949.727.9336

Page 11554488 ends
Page 11554499 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 12

5. Third Party/Subcontractors
TRC has the expertise, resources, and capabilities to self-perform all services outlined in this proposal.

At this time, we do not intend to utilize any subcontractors for the implementation of these services.

However, should the need arise during the course of the project, TRC is fully prepared to collaborate with subcontractors from RCMU’s approved vendor list.

Page 11555500 ends
Page 11555511 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 13

6. Staff Resumes and Organization Chart
Organization Chart and Organizational Approach
TRC is ready to support RCMU with a team of highly skilled professionals who bring local knowledge, technical expertise, and extensive experience to the project. Our team includes key personnel and subconsultants who are wellequipped to perform the scope of services outlined in the RFP.

The organization chart below identifies the key personnel for the contract. If any key personnel become unavailable during the contract, TRC will submit a written request to RCMU to propose a replacement with comparable qualifications for approval.

Key Personnel and Roles
The TRC project team will be led by an experienced Project Manager, who will act as the primary point of contact for both internal and external communications. The Project Manager will coordinate efforts across the team and work closely with RCMU to deliver high-quality results.

Summary Execution Table
Name Title Office Location Description of Roles
Gelena Buford Associate Project
Manager Phoenix, AZ Project Manager
Al Kepuska Vice President Irvine, CA VP sponsor, Account Manager
Spruha Sheth Director, Substation
Engineering Irvine, CA Substation POC, Account lead
John Stushek, PE Substation Engineering
Manager Phoenix, AZ Substation QAQC
Wayne Uyemura,
EIT Substation Engineer Irvine, CA Substation Lead Engineer Edras LepeZapata,
PE Electrical Engineer Los Angeles, CA Electrical Engineer Lead Jim Brisky, PE Distribution Operations
Director Irvine, CA Distribution POC
Ruwin Ranaweera Distribution Operations
Manager Irvine, CA Distribution Lead
Katrina Blake, PE Distribution Operations
Manager San Diego, CA Distribution QAQC
Christopher Rank Regional Manager Irvine, CA Testing &
Commissioning POC
Diego Feo-Mendez Field Service Supervisor Houston, TX Testing & Commissioning Lead

Page 11555522 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 14 Name Title Office Location Description of Roles
Nathan Bernard Regional Manager Indianapolis, IN Construction Management POC
Timothy
Florentino
West Region
Construction Manager
Superior
Reno, NV Construction
Management Lead
Regan Vreeland Survey Manager San Diego, CA Survey Services Lead Resumes
Detailed resumes for all key personnel are provided in Appendix A. These resumes highlight each team member’s qualifications, relevant experience, and professional licenses where applicable.

Organizational Chart
Please see TRC’s organizational chart below:

Page 11555533 ends

Rancho Cucamonga Municipal Utility (RCMU)
Various On-Call Services
Invitation #: SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 15 Organization Chart

Page 11555544 ends
Page 11555555 ends

Rancho Cucamonga Municipal Utility (RCMU)
Various On-Call Services
Invitation #: SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 16

7. Project Management Approach
TRC views project management as a cornerstone of successful project delivery. Our approach is built on clear communication, accountability, and proactive planning to meet client expectations and project goals. TRC’s Project Managers are experienced professionals with a proven ability to manage projects of all sizes and complexities. The Project Manager will serve as the primary point of contact, overseeing all aspects of the project, including engineering, quality assurance, safety, cost control, and schedule management.

MANAGEMENT TEAM
 Project Executive – Spruha Sheth, PE
 Project Sponsor – Al Kepuska, PE
 Project Manager – Gelena Buford

MEETINGS
 Initial kickoff meeting
 Weekly project team meetings during active project
periods
 Coordination of drawing package submittal reviews
 Preparation and distribution of meeting agendas and
minutes
 Virtual meetings for design package reviews
Quality Control Procedures
Quality assurance is embedded in every phase of the project. TRC’s Project Manager will oversee all engineering and design activities, ensuring compliance with industry standards and client requirements.

Regular reviews of deliverables, coordination meetings, and stakeholder feedback loops are used to maintain high-quality outcomes.

Cost Control Procedures
TRC employs a range of tools and processes to manage costs effectively. Upon assignment submission, resource needs are assessed, commitments from key staff are secured, and activities are coordinated to optimize efficiency. Regular team meetings are held to track progress toward milestones and deadlines, ensuring that project schedules are maintained while accommodating minor delays.

The TRC Project Manager provides routine status updates to the client’s PM and proactively addresses any issues that could result in significant delays. If necessary, mitigation strategies are implemented to minimize disruptions. TRC also utilizes secure, access-controlled document libraries, such as SharePoint, for document sharing and collaboration. These tools allow designated users to access critical project documents, including GIS maps and CAD drawings, while ensuring data security.

Schedule Control Procedures
TRC uses P6 software to develop and manage project schedules. A baseline schedule will be submitted for approval within two weeks of receiving the purchase order. Monthly schedule updates will be provided, incorporating all TRC activities and key interface points with other stakeholders. This approach allows us to monitor progress, identify potential delays, and adjust timelines as needed to meet project objectives.

Project Tracking and Performance Monitoring Procedures
TRC’s project tracking and performance monitoring procedures are designed to provide real-time insights into project progress. Written monthly reports, change requests, RFIs, and schedule updates are used to keep all stakeholders informed. Regular meetings and virtual design reviews keep all team members aligned and focused on achieving project milestones.

Page 11555566 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 17 Project Progress Reporting Procedures
TRC provides comprehensive progress reporting to promote transparency and accountability. Written monthly reports outline the status of TRC’s portion of the project, while meeting agendas and minutes are shared with stakeholders to document discussions and decisions. Change requests and RFIs are tracked and communicated promptly so that all parties remain informed of updates and adjustments.

Page 11555577 ends
Page 11555588 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 18

8. Quality Management System
Quality Is Not Achieved by Chance
Quality must be thoughtfully and strategically planned and managed, and employees and our suppliers must be held individually accountable for the quality of their work. Our Quality Management Program is based on the International Organization for Standardization (ISO) 9001 set of standards and its eight management principles.

Governance and Controls
An executive-level Quality Council steers and harmonizes quality efforts across all business sectors and shared services. Participants include the Executive Management team and as designated Senior Quality Leaders within each business area. A Corporate Quality team serves to provide day-to-day support and expertise to each business area so that they can define and achieve their quality goals.

A Quality Management Policy is in effect to establish quality requirements and guidance common to all business areas. Quality Management Plans are managed at Practice levels and quality goals are tailored to the unique business processes and work products.

Quality Components
We understand that delivering high-quality work is what makes our customers return. TRC is committed to monitoring, controlling, and continually improving the quality of our work products. Key components of our Quality Management Program include:
 Quality Assurance using preventive measures such as regular updates to SOPs, employee training, and statistical data analysis of predictive triggers of quality deficiencies.  Quality Control measures that include multiple approvals, mandatory peer reviews, rigid versioning controls on all deliverables, and a program of regular audits for compliance to established processes.
 Ongoing process improvement to continually improve efficiency and effectiveness of our work. TRC developed a strategic approach to process improvement that includes alignment to customer requirements, business risk, and our quality goals.

Quality Assessments and Audits
TRC implements a structured quality assessment and audit program to monitor compliance to established policies, procedures, and requirements. The key activities of this program include:
 Annual Enterprise Risk Assessments are conducted across TRC by our Internal Audit team and evaluated by our Board of Directors
 Quality self-assessments are conducted by each business area in each office annually to identify deficiencies and improvement opportunities
 Top 25 project reviews are conducted throughout the year to review project financial and quality performance and the risk plans
 Systematic audits are automated to report compliance to signoff sheets and other process controls  A sample of work deliverables are manually spot-checked regularly to verify compliance with quality requirements
 Staff training is a routine part of normal business, The status of staff training and certifications is tracked, and internal training programs are continuously evaluated and updated.

Project-Specific Plans
Every project plan is developed in accordance with TRC’s Quality Management Plan and quality requirements are defined for each deliverable to our customers. Examples of the content of these plans include:

Page 11555599 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 19  Assignment of project team members with the requisite expertise and experience to successfully execute each task
 Assignment of a TRC Technical or Engineering Expert (as applicable) to review project approaches and participate in peer reviews
 Assessment plan to verify compliance with contractual terms and guidelines  Before commencing work, the complete scope and schedule of a project must be understood, and processes and controls must be identified to fulfill project requirements.  Proposals and project plans include budgets that are adequate to complete the scope of work, including the appropriate quality controls.
 Document tracking procedures to guide circulation of review comments as work products pass through different contributors and reviewers
 Peer review requirements by a qualified individual of all technical or engineering judgments and materials
 Final quality check of work products before delivery to the client Continual Improvement
We know the value of regular communication to drive ongoing improvements. TRC’s ‘Quality Begins with Me’ communication program is actively managed using multiple venues including email bulletins, Quality Moments on staff calls, webinars, and more. Quality-related data are statistically analyzed, and findings are reviewed in bi-weekly project team meetings to proactively remediate issues. Lessons Learned Reviews and Client Feedback processes are used to capture quality issues and identify trigger mechanisms to prevent their future reoccurrence. We take seriously our commitment to instill a culture of quality in every employee at TRC.

Page 11556600 ends
Page 11556611 ends

Rancho Cucamonga Municipal Utility
Various On-Call Services
SOQ #25/26-501
© 2026 TRC | All Rights Reserved | TRC Proposal No. 000735660.9990 20

9. Appendix A: Staff Resumes

Page 11556622 ends

SPRUHA B. SHETH

ROLL WITHIN ON-CALL
Serve as the point of contact for all substation technical and account needs, overseeing substation engineering design and support services.

LENGTH OF TIME WITH THE COMPANY
Spruha has been contributing to TRC since 2025, bringing over 24 years of experience in substation engineering, protection and control design, and project management.

LICENSES, REGISTRATIONS, AND CERTIFICATIONS
Spruha Sheth holds the following licenses, registrations, and certifications:
 Professional Engineer, Electrical – CA, OR, WA

EDUCATIONAL BACKGROUND
B.S., Electrical Engineering, University of Texas, Arlington, 2001

WORK HISTORY ON SIMILAR OR LIKE PROJECTS WITH OTHER MUNICIPALITIES TRC Companies – Yorba Linda, CA (Director of Substation Engineering – West Region: 2025– Present)
Spruha supports the substation department for the West U.S. region, hiring and developing the team, ensuring quality control for all projects, and managing financials, timelines, deliverables, and client communications. She provides support for proposals, RFP responses, and client management, ensuring successful project execution.

West Power Energy – Arcadia, CA (Director of Substation Engineering: 2024–2025) Spruha established and led substation and protection & control engineering teams, supporting activities such as estimation, scoping, design, procurement, and engineering for various client utilities in North America. She managed financials, timelines, deliverables, and client expectations while ensuring quality control for all projects.

Burns & McDonnell – Brea, CA (T&D Substation Department Manager/Project Manager: 2016– 2023)
Spruha managed a team of engineers providing estimation, scoping, design, procurement, and engineering for client utilities across North America. She oversaw quality checks and reviews for all projects, managed financials and timelines, and developed relationships with new clients while submitting proposals for RFPs. As Substation Department Manager, she led a team of 20 direct reports and managed a team budget of $10–12 million.

Baltimore Gas & Electric Company – Baltimore, MD (Manager, Protection & Control Engineering:
2014–2016)
Spruha managed $1 million worth of protection and control projects, leading 21 direct reports. She administered engineering standards and guidelines consistent with industry standards and NERC compliance requirements. She managed program budgets and timelines for P&C programs such as aging infrastructure, NERC compliance, and CIP V5 implementation.

Page 11556633 ends

2 Spruha B. Sheth
Baltimore Gas & Electric Company – Baltimore, MD (Manager/Supervisor, System Analysis and Support, Protection & Control Engineering: 2012–2014)
Spruha led a team of 12 direct reports responsible for system protection, volt/VAR management, DA Reclosers, and distribution automation. She managed NERC compliance-related activities affecting protection and control systems and oversaw smart grid updates and CVR support.

Baltimore Gas & Electric Company – Baltimore, MD (Senior Protection & Control Engineer: 2006– 2012)
Spruha managed relay and control engineering and design for substation projects, developing scope documents, protection relay settings, and bill of materials procurement. She performed fault studies and relay setting calculations for electromechanical and microprocessor relays, ensuring compliance with NERC and BGE standards.

Hatch Mott MacDonald – Framingham, MA (Electrical Engineer III: 2004–2006) Spruha performed electrical design and engineering assignments for utilities such as National Grid, focusing on relay and control engineering and design for substation equipment upgrades.

Public Services of New Hampshire (PSNH) – Manchester, NH (Protection and Control Engineer:
2003–2004)
Spruha created scope, design, and material procurement for protection and control engineering projects as a contract employee.

Lower Colorado River Authority (LCRA) – Austin, TX (Engineer Associate II: 2001–2003) Spruha performed relay and control engineering assignments involving modifications to systems, equipment, materials, and procedures. She provided instructions on complex features and established precedents for solutions.

Lower Colorado River Authority (LCRA) – Austin, TX (Engineer Associate I: 2001) Spruha designed new stations and panel procurement, performing relay and control engineering assignments involving modifications to systems and equipment.

Page 11556644 ends

TRCcompanies.com

GELENA BUFORD

ROLL WITHIN ON-CALL
Serve as the Project Manager, overseeing the planning, execution, and coordination of electrical engineering design and support services for RCMU. Gelena manages project timelines, cost estimates, and design deliverables, while acting as the liaison between applicants, developers, contractors, and external agencies. She facilitates preconstruction and on-site meetings, addresses bidder inquiries, and coordinates emergency on-call responses to outages, driving timely resolution and project continuity.

LENGTH OF TIME WITH THE COMPANY
Gelena Buford has been contributing to TRC since 2024, bringing over five years of experience in customer service and project management.

LICENSES, REGISTRATIONS, AND CERTIFICATIONS
N/A

EDUCATIONAL BACKGROUND
B.S. Business Administration, Southern New Hampshire University, 2024

WORK HISTORY ON SIMILAR OR LIKE PROJECTS WITH OTHER MUNICIPALITIES Salt River Project (SRP), Alexander-Pringle 69kV Upgrade – Phoenix, AZ (Project Coordinator:
2024–Present)
Gelena served as project coordinator for TRC during the Alexander-Pringle Upgrade. The project involved building a new panel with a metering SEL-735, dual SEL-411Ls, control handles, and a breaker fail lockout at the Alexander Station. The Pringle Station upgrades included current line relays with a new panel design. Gelena’s responsibilities included client coordination, team coordination, and document control to ensure the project was completed efficiently and accurately.

PacifiCorp (PAC), Transmission Exp Segment C EOR – Salt Lake City, UT (Project Coordinator:
2024–Present)
Gelena served as project coordinator for this multi-year task order contract. TRC provided PacifiCorp with Engineer of Record services for both transmission and substation portions of the project. The transmission project involved a 40-mile-long double-circuit high voltage (EHV) alternating current (AC) transmission line, while the substation project included a greenfield 525/345/138kV Limber Substation.

Gelena’s responsibilities included budget reporting and document control, ensuring the project adhered to financial and administrative requirements.

Public Service Company of New Mexico (PNM), Relay Setting Review FERC Order 881 – NM (Project Coordinator: 2024–Present)
Gelena served as project coordinator for TRC during this relay setting review. TRC assessed existing relay settings on 115/230/345kV transmission lines regarding loadability defined by NERC PRC-023.

Gelena’s responsibilities included proposal development, client and team coordination, budget management, and document control, ensuring compliance with regulatory standards.

Page 11556655 ends

2 Gelena Buford
Public Service Company of New Mexico (PNM), Guadalupe 345kV Station Service Upgrades – NM (Project Coordinator: 2024–Present)
Gelena served as project coordinator for TRC during the Guadalupe Substation Upgrades. The project involved developing an engineering plan to install and construct the reactor tertiary AC source with a new SSVT, adding a new emergency standby generator (GEN), and integrating an ATS into the existing SVC station service ATS scheme. Gelena’s responsibilities included proposal development, client and team coordination, budget management, and document control, ensuring the project met technical and financial objectives.

Page 11556666 ends

TRCcompanies.com

JOHN STUSHEK, PE

ROLL WITHIN ON-CALL
Serve as the Substation Engineering Manager responsible for overseeing substation design and engineering services, including system design, specification, protection and control systems, and construction support.

LENGTH OF TIME WITH THE COMPANY
John has been contributing to TRC since October 2019, bringing over 14 years of experience in substation physical and electrical design, protection and control systems, and project management.

LICENSES, REGISTRATIONS, AND CERTIFICATIONS
John holds the following professional registrations and certifications:
 Professional Engineer, Arizona (#70538)
 Professional Engineer, California (#E21719)
 Professional Engineer, Illinois (#062-067428)
 Professional Engineer, Kentucky (#37493)
 Professional Engineer, Nevada (#23932)
 Professional Engineer, New Mexico (#26481)
 Professional Engineer, North Carolina (#046371)
 Professional Engineer, Oklahoma (#33248)
 Professional Engineer, South Carolina (#36039)
 Professional Engineer, Texas (#129455)
 Professional Engineer, Virginia (#0402059023)
 Professional Engineer, Washington (#19110928)
 Professional Engineer, West Virginia (#22908)
 NCEES Record (#1527411)

EDUCATIONAL BACKGROUND
BS, Electrical Engineering, University of Illinois, 2009

WORK HISTORY ON SIMILAR OR LIKE PROJECTS WITH OTHER MUNICIPALITIES American Electric Power, Various Projects (Project Engineer) John served as Project Engineer for several AEP projects, including the brownfield 69kV Jefferson Station Rehab, greenfield 138kV Wolfcamp POP Tap, and greenfield 138kV Solanum POD Tap. His responsibilities included interfacing with the AEP engineering and management team and leading substation, protection and control (P&C), and civil design teams to successfully complete project scopes.

Engineering Partners, NAS Lemoore F-35C Electrical Upgrade – NAS Lemoore, CA (Project Engineer/Lead P&C Designer)
John served as Project Engineer and Lead P&C Designer for the brownfield NASL Operations Substation Expansion and the greenfield NASL Metering Station. His responsibilities included designing new protection for both substations and overseeing all protection and control for the Metering Station.

Page 11556677 ends

2 John Stushek, PE
E.S. Boulos, Gravel Pit Solar Collector Substation – ME (Project Engineer/Lead Engineer) John served as Project Engineer and Lead Engineer for the greenfield 115/34.5kV Gravel Pit Solar Collector Substation. He oversaw substation electrical, conduit, grounding, and lightning design, relay panel, schematic, and wiring design, while interfacing with the owner and design teams.

Public Service of New Mexico, Pachmann Station Distribution Addition – NM (Project Engineer) John served as Project Engineer for the brownfield Pachmann Station Distribution Addition. He led substation and civil design teams to successfully complete the project scope, which involved adding a distribution transformer, switchgear, and high-side 115kV circuit breaker.

Silicon Valley Power, Freedom Circle Junction – CA (Owner’s Engineer/Lead P&C Designer) John served as Owner’s Engineer and Lead P&C Designer for the 60kV Freedom Circle Junction. He oversaw and approved design and material submittals, provided construction support, and designed and sealed all control enclosure procurement drawings for the station.

San Diego Gas & Electric, QAQC MSA – CA (Project Engineer/Checker) John served as Project Engineer and Checker for various SDG&E P&C projects sent to TRC for outside QAQC. He managed teams of up to ten checkers, created budget and schedule proposals, and delivered high-quality checks that met SDG&E’s expectations.

POWER Engineers – Fort Mill, SC (Project Engineer II/Lead Electrical Engineer) John served as Project Engineer II and Lead Electrical Engineer, preparing design schematics, wiring, equipment, conduit, and grounding drawings, while supervising project schedules, budgets, and quality control.

South Texas Electric Cooperative, Various Substations – TX (Project Engineer/Lead Electrical Designer)
John served as Project Engineer and Lead Electrical Designer for multiple substation projects, including Quihi 138/24.9kV Substation, Oaks 138/69/12.47kV Substation, and Fowlerton 345/138/24.9kV Substation. His responsibilities included designing new protection and control systems and overseeing substation expansions and upgrades.

Commonwealth Edison, TSS187 Schauff Road 138kV Substation – IL (Project Engineer/Lead Electrical and Physical Designer)
John served as Project Engineer and Lead Electrical and Physical Designer for the greenfield Schauff Road Substation, designing new protection, control, and SCADA systems for the entire substation.

Portland General Electric, McGill 115/13kV Substation – OR (Lead Physical Designer) John served as Lead Physical Designer for the expansion and partial re-build of McGill Substation, designing new protection, control, and SCADA systems for the entire substation.

NV Energy, Various Substations – NV (Project Engineer/Lead Designer) John served as Project Engineer and Lead Designer for multiple NV Energy projects, including Brunswick 120/60kV Substation, Alpine 230kV Switching Station, and Coyote Creek 345/120kV Substation. His

Page 11556688 ends

3 John Stushek, PE
responsibilities included designing new protection, control, and SCADA systems for substations and switching stations.

Sargent & Lundy, Electrical Engineer – Chicago, IL (Electrical Engineer) John served as Electrical Engineer, designing one-line diagrams, schematic diagrams, wiring diagrams, equipment plan and elevation drawings, conduit drawings, and grounding drawings.

Page 11556699 ends

TRCcompanies.com

WAYNE UYEMURA, EIT

ROLL WITHIN ON-CALL
Serve as a Substation Engineer responsible for providing technical expertise in substation physical design, protection and control design, project estimates, and construction support.

LENGTH OF TIME WITH THE COMPANY
Wayne has been contributing to TRC since November 2020, bringing over six years of progressive experience in electrical engineering consulting.

LICENSES, REGISTRATIONS, AND CERTIFICATIONS
Wayne holds the following licenses, registrations, and certifications:
 Engineer in Training (EIT) Certification, California (#156471), 2015

EDUCATIONAL BACKGROUND
B.S., Electrical Engineering, Gonzaga University, 2015

WORK HISTORY ON SIMILAR OR LIKE PROJECTS WITH OTHER MUNICIPALITIES E.S. Boulos, Gravel Pit – East Windsor, CT (Station & PCE Designer: 2022) Wayne served as the station and PCE designer for this project, which involved the installation of two transformers, five feeder breakers, and new control panels for the new equipment.

AEP, Tulsa North – Sperry, TX (Station Designer: 2022)
Wayne served as the station designer for this project, which involved removing an existing line trap and replacing the bus connections. An additional scope change included installing two CCVTs.

SRP, Grasmoen & Stapley – Phoenix, AZ (PCE Designer: 2021) Wayne served as the lead PCE designer for this project, which involved installing two new line protection panels at two stations and removing one existing DFR.

AEP, Laguna – Corpus Christi, TX (Station Designer: 2021) Wayne served as the station designer for this project, which involved installing two distribution feeder breakers, redoing the bus connections, replacing the station service fuse cutout switch, and replacing bus PTs.

AEP, Wolfcamp – Rankin, TX (Station Designer: 2021)
Wayne served as the station designer for this project, which involved installing a new phase-over-phase switch for 138kV transmission lines.

AEP, Jefferson Rehab – Jefferson, TX (Station Designer: 2021) Wayne served as the station designer for this project, which involved installing a 69kV box bay with two circuit breakers, new CCVTs, and new station service. Additionally, a lighting study and ground grid analysis were conducted.

Page 11557700 ends

2 Wayne Uyemura, EIT
ONCOR, Graham 138kV – Graham, TX (Lead Designer: 2019–2020) Wayne served as the lead designer for this project, which involved upgrading the entirety of the clientowned protection by installing twelve new protection panels, including line, bus, transfer trip, carrier tester, and generator interface panels. New 138kV CCVT sets were installed for each bus and the 138kV autotransformer terminal.

ONCOR, Hutto – Hutto, TX (Engineer: 2019–2020)
Wayne served as a design engineer for both physical and electrical protection and control. The project involved installing a second 345/138kV autotransformer at the station, a tertiary reactor bank, and modifying the station service system for the new installation.

ONCOR, Hext – Menard, TX (Lead P&C Designer: 2018–2019) Wayne served as the lead protection and control designer for this project, which involved installing distributive generation for a 15kV feeder, including a new transfer trip and transformer differential protection panel and radio communications. He also assisted with the physical design to replace voltage regulators with a new transformer as needed.

ONCOR, Lufkin East – Lufkin, TX (Engineer: 2018–2019)
Wayne served as the lead design engineer for both physical and electrical protection and control. The project involved installing distributive automation on 15kV feeders, replacing three self-contained 15kV circuit breakers, installing a retrofit relay plate, a UF/UV panel, and radio communications along with a CIP box.

ONCOR, Robinson Northwest – Robinson, TX (Lead Designer: 2019) Wayne served as the lead designer for this project, which involved installing distributive generation for a 15kV feeder, including a new transfer trip protection panel and radio communications.

ONCOR, Nacogdoches South – Nacogdoches, TX (Lead Designer: 2018–2019) Wayne served as the lead designer for both physical and electrical protection and control. The project involved installing two fault interrupting devices and upgrading the bus protection by replacing two bus protection panels.

ONCOR, Eddy – Eddy, TX (Lead Designer: 2018–2019)
Wayne served as the lead designer for this project, which involved installing distributive generation for a 15kV feeder, including a new transfer trip protection panel, fiber communications, and a set of 69kV CCVTs for transmission.

ONCOR, Hutto – Hutto, TX (Engineer: 2018)
Wayne served as a design engineer for electrical protection and control. The project involved installing distributive automation on various 15kV feeders, upgrading RTU installations, and establishing fiber communications between control houses by installing CIP boxes and communications equipment.

Page 11557711 ends

TRCcompanies.com

EDRAS LEPE-ZAPATA, PE

ROLL WITHIN ON-CALL
Serve as a Substation Engineer responsible for providing technical expertise in substation physical design, protection and control design, project scoping, estimates, and construction support.

LENGTH OF TIME WITH THE COMPANY
Edras has been contributing to TRC since December 2020, bringing over 10 years of progressive experience in electrical engineering consulting.

LICENSES, REGISTRATIONS, AND CERTIFICATIONS
Edras holds the following licenses, registrations, and certifications:
 Professional Engineer, California (#23096), 2019

EDUCATIONAL BACKGROUND
B.S., Electrical Engineering, California State University Northridge, 2015

WORK HISTORY ON SIMILAR OR LIKE PROJECTS WITH OTHER MUNICIPALITIES AEP, Tulsa North – Sperry, OK (Engineer: 2022)
Edras served as the P&C design engineer for this project, which involved installing a 138kV line relay panel and a 138kV CB protection and control lower relaying plate to an existing relay panel. The scope included replacing CCVTs, removing a wave trap, and running new cables to the existing circuit breaker.

AEP, North Victoria – Victoria, TX (Engineer: 2021)
Edras served as the P&C design engineer for this project, which involved replacing 12kV circuit breakers, installing relay panels, and running new conduits and cables. He also performed station service and voltage drop calculations.

AEP, Wolfcamp – Upton County, TX (Engineer: 2021)
Edras served as the P&C design engineer for this project, which involved installing a 138kV Phase-OverPhase switch and potential transformers to tap off the existing transmission line.

AEP, Jefferson – Jefferson, TX (Engineer: 2021)
Edras served as the P&C design engineer for this project, which involved upgrading the 69kV side of the station by replacing circuit breakers and installing a Drop-In Control Module (DICM) with relay panels and equipment.

Oncor, Midland West – Midland, TX (Engineer: 2020)
Edras served as the lead physical design engineer for this project, which involved installing a new power transformer, feeder circuit breaker, and bus connections.

Oncor, Tyler Bullard Road – Tyler, TX (Engineer: 2020)
Edras served as the lead physical and electrical design engineer for this project, which involved installing distribution automation to feeder breakers and communication equipment.

Page 11557722 ends

2 Edras Lepe-Zapata, PE
Oncor, Western Hills – White Settlement, TX (Engineer: 2019–2020) Edras served as the lead physical and electrical design engineer for this project, which involved replacing relay panels, installing an AC panel, and adding distribution automation to feeder breakers.

Oncor, Deleon – Deleon, TX (Engineer: 2019)
Edras served as the lead physical and electrical design engineer for this project, which involved installing distribution automation to feeder breakers and communication equipment.

Oncor, Lufkin South – Lufkin, TX (Engineer: 2019)
Edras served as the lead protection and control design engineer for this project, which involved installing relay retrofit panels and a voltage throw-over scheme.

Oncor, Temple – Temple, TX (Engineer: 2018–2019)
Edras served as the lead physical and electrical design engineer for this project, which involved replacing a circuit breaker and installing a voltage throw-over scheme.

LCRA, Menger Creek – Boerne, TX (Engineer: 2018–2019)
Edras served as the lead protection and control design engineer for this project, which involved upgrading the substation configuration and installing a new power transformer and circuit breaker.

Ameren, Blanchette – St. Charles, MO (Engineer: 2017–2018) Edras served as the lead electrical design engineer for this project, which involved performing AC station service and DC battery system calculations and installing a new battery system and charger.

Ameren, South Belleville – Belleville, IL (Engineer: 2017–2018) Edras served as the lead electrical design engineer for this project, which involved performing AC station service and DC battery system calculations and installing a new battery system and charger.

PacifiCorp, Windstar – Converse County, WY (Engineer: 2017) Edras served as the protection and control design engineer for this project, which involved installing DFR panels to comply with NERC reliability standards.

TESORO, Main Station – Wilmington, CA (Engineer: 2016–2017) Edras served as the protection and control design engineer for this project, which involved upgrading relaying on switchgear cubicles from electromechanical relays to SEL-351 relays.

Page 11557733 ends

TRCcompanies.com
JAMES D. BRISKY

ROLL WITHIN ON-CALL
Serve as the Distribution Operations Director, and will oversee project planning, design, and execution for RCMU, including wildfire hardening, pole replacements, capacity and reliability projects, and emergency response.

LENGTH OF TIME WITH THE COMPANY
James (Jim) D. Brisky has been contributing to TRC since March 2022, bringing over 40 years of experience in utility electric and gas distribution design.

LICENSES, REGISTRATIONS, AND CERTIFICATIONS
Jim has completed specialized training and certifications, including:
 Service Planning Director Rotation (18 months during 2015–2016) – covering the southern half of PG&E’s system
 Lean Six Sigma – Yellow Belt
 Division Safety Chairperson for Stanislaus Division, 1992  Division Safety Chairperson for Yosemite Division, 1994  Manager Sponsor for PG&E’s Grassroots Safety Team, 2017–2021

EDUCATIONAL BACKGROUND
B.S., Industrial Technology, Fresno State, 1984

WORK HISTORY ON SIMILAR OR LIKE PROJECTS WITH OTHER MUNICIPALITIES TRC, Distribution Operations Design Team – San Francisco, CA (Operations Director: 2022– Present)
Jim oversees multiple work streams for Pacific Gas and Electric Company, including wildfire hardening, pole replacements, capacity and reliability projects, electric compliance, new business, and emergency orders. His team prepares distribution design packages, including estimates, construction drawings, and pole loading calculations. The team is currently managing over 1,000 poles/tags, 60 miles of wildfire hardening, and several hundred new business orders. Jim ensures all deliverables meet utility standards for timeliness and constructability.

Pacific Gas and Electric (PG&E), Electric Distribution Contract Estimating – San Francisco, CA (Contract Estimating Manager: 2016–2021)
Jim managed PG&E’s outsourcing of electric distribution design work to seven vendors with more than 600 designers. He reviewed and approved MSA/CWAs for each vendor, ensuring completed work met PG&E standards for timeliness and accuracy. He oversaw four distribution supervisors and 60 associate distribution engineers/owner engineers. Jim also reviewed vendor invoices for payment, ensuring alignment with agreed pricing and scope. He approved all contract change orders, ensuring necessity, accuracy, and alignment with scope changes.

Page 11557744 ends

2 James D. Brisky
Pacific Gas and Electric (PG&E), Service Planning – Stockton/Yosemite and Fresno/Kern, CA (Service Planning Manager: 2008–2016)
Jim managed new business customer contact responsibilities, from application for service to meter set.

He led teams of supervisors, industrial power engineers, senior new business representatives, and designers to prepare construction packages and ensure customer payments and contracts were in place.

He worked closely with City and County leadership teams to address issues and supported storm restoration efforts by deploying designers to assist with restoration.

Pacific Gas and Electric (PG&E), Service Planning and Distribution Design – Various Locations, CA (Service Planning Supervisor/Industrial Power Engineer/Estimator: 1985–2008) Jim progressed through roles as an estimator, senior new business representative, industrial power engineer, and distribution supervisor. This experience provided him with a detailed understanding of distribution design and customer service. He developed a strong appreciation for working directly with customers to ensure timely and satisfactory delivery of services.

Page 11557755 ends

TRCcompanies.com
RUWIN M. RANAWEERA

ROLL WITHIN ON-CALL
Ruwin will serve as the Distribution Operations Manager responsible for overseeing electrical engineering design and support services, including planning, cost estimating, and complete design services for new distribution lines and service extensions.

LENGTH OF TIME WITH THE COMPANY
Ruwin has been contributing to TRC since October 2019, bringing six years of progressive experience in electrical power distribution engineering and operations management.

LICENSES, REGISTRATIONS, AND CERTIFICATIONS
N/A

EDUCATIONAL BACKGROUND
B.S., Mechanical Engineering, California State University – Long Beach, 2015 A.S., General Engineering, Orange Coast College, 2013

WORK HISTORY ON SIMILAR OR LIKE PROJECTS WITH OTHER MUNICIPALITIES Pacific Gas & Electric Company, New Business – CA (Operations Supervisor/Engineer: 2021– Present)
Ruwin oversees the PG&E New Business program, where he has played a pivotal role in expanding the workstream to generate approximately $11 million in revenue. He leads a multidisciplinary team of up to 35 professionals, including engineers, designers, QA/QC reviewers, and fielding technicians, while directly managing and mentoring a core team of 12 staff members. Ruwin’s leadership has fostered internal promotions and career development, significantly enhancing team capacity. He also led the successful onboarding of technical staff to support long-term program growth. To improve operational efficiency, Ruwin transitioned program management from traditional spreadsheets to Smartsheet, automating approximately 80% of workflows and improving overall productivity.

Pacific Gas & Electric Company, Pole Replacement/Maintenance – CA (Designer: 2019–2021) Ruwin served as a lead designer and estimator for both overhead and underground power distribution infrastructure projects supporting major utility clients, including PG&E. His work included engineering the design of overhead systems under PG&E’s Pole Replacement and Wildfire Hardening Program, where he conducted field data collection, performed pole loading analysis using OCalc Pro, and prepared construction sketches, material estimates, circuit map updates, and JPA forms to develop build-ready packages. As part of the Underground Facilities Refurbishment Program, he created construction designs and material takeoffs for rehabilitating subsurface and pad-mounted equipment, ensuring performance through voltage drop, flicker, and cable pull calculations. Ruwin also contributed to the Post Estimating Program, where he produced as-built design packages and material estimates for emergency construction jobs. Throughout his tenure, he demonstrated proficiency in PG&E’s internal systems including SAP, EDGIS, AutoCAD, OCalc Pro, and EES/FFE/CCBS, and received the highest individual design quality rating (90%) among his peers.

Page 11557766 ends

TRCcompanies.com
KATRINA M. BLAKE, PE

ROLL WITHIN ON-CALL
Serve as the Distribution Operations Manager, managing electrical engineering design, project coordination, and emergency response for RCMU. Katrina acts as the primary liaison for applicants, developers, and contractors, handling project execution, compliance with standards, and resolution of outages or emergencies.

LENGTH OF TIME WITH THE COMPANY
Katrina M. Blake, PE, has been contributing to TRC since June 2017, bringing nine years of experience in transmission line design, project management, and construction support.

LICENSES, REGISTRATIONS, AND CERTIFICATIONS
Katrina M. Blake, PE, holds the following professional registrations and certifications:
 Professional Engineer, California (#C84380)
 Professional Engineer, Texas (#121074)

EDUCATIONAL BACKGROUND
B.S., Civil Engineering, University of South Florida, 2011 B.S., Communication for Business, Florida State University, 2001

WORK HISTORY ON SIMILAR OR LIKE PROJECTS WITH OTHER MUNICIPALITIES San Diego Gas & Electric, Pole Loading Compliance Program (PLCP) – San Diego County, CA (Distibution Operations Manager: 2020–Present)
Katrina is guiding a team with the analysis and design of existing and new distribution structures to determine structural issues and clearance violations. She uses PLS-CADD and Ike GPS systems to capture span data and attachment heights, ensuring structural accuracy and compliance. As Engineer of Record, she has reviewed over 500 poles and provided her seal to verify pole loading reports.

Los Angeles Department of Water and Power, McCullough-Victorville 500 kV Uprate Feasibility Study – Los Angeles, CA (Project Supervisor: 2019–Present) Katrina is supervising the feasibility study to uprate the McCullough-Victorville 500 kV tower line to 570 kV. She oversees field investigations, desktop photo analysis, and computer-aided tools to determine mitigation efforts and costs, providing LADWP with critical information for future bid evaluations.

Pacific Gas & Electric, Structural Transmission Evaluation Program (S.T.E.P) Pilot Program – San Francisco, CA (Lead Project Engineer: 2019)
Katrina led the modeling of structures under extreme wind loading to assist PG&E’s Wildfire Safety Inspection Program (W.S.I.P). Her responsibilities included project management, resource planning, scheduling, and quality management to ensure the reliability of the system and prevent future wildfires.

Page 11557777 ends

2 Katrina M. Blake, PE
Pacific Gas & Electric, Drone Data Analysis and Evaluation Program (D.I.R.T) – San Francisco, CA (Project Engineer: 2019)
Katrina analyzed drone data from flights around transmission towers and poles, evaluating insulators, conductors, hardware, foundations, guy wire systems, steel coatings, and corrosion. She identified failure modes and recommended remediation measures to improve system reliability.

Pacific Gas & Electric, SCADA Switch Program – San Francisco, CA (Lead Project Engineer: 2017– Present)
Katrina is assisting with the replacement of existing wood poles and manually operated switches with SCADA-operable switches on engineered poles. She reviews PLS-CADD models, Plan and Profile drawings, Structure Data Sheets, Stringing Charts, Bill of Material, Plan Maps, and Overtension reports as part of the Quality Assurance/Quality Control process.

Pacific Gas & Electric, Major Capital Projects – San Francisco, CA (Lead Engineer: 2015–2016) Katrina managed and reviewed transmission line scopes and estimates for over 100 approved projects.

She led three major capital projects, preparing route selection options, attending site visits, participating in community outreach efforts, and interfacing directly with clients.

American Electric Power, Asherton 69 kV Tie Line and Brackettville 69 kV Tie Line – Texas (Lead Project Engineer: 2014–2016)
Katrina trained and reviewed the work of team engineers, coordinated with internal substation departments, and provided construction planning and support. These projects involved designing tubular steel poles with concrete foundations for 115 kV upgrades.

San Diego Gas & Electric, East County Substation 138 kV Tie Line, 69 kV Tie Line, and Southwest Power Link 500 kV Loop-In – San Diego County, CA (Owner’s Engineer: 2013–2014) Katrina reviewed and evaluated design packages, including PLS-CADD models, Design Criteria, General Arrangement drawings, Load Tree calculations, Sag-Tension Calculations, and Overhead Structure Designs.

Public Service Enterprise Group, McLean and Paterson Substations – New Jersey (Project Engineer: 2013)
Katrina assisted in the design of riser poles and strain buses for Metro 69 kV conversion substations. She prepared load tree calculations and diagrams for added equipment and substation strain buses.

Pacific Gas & Electric, NERC Design Verification and Mitigation Priority II – San Francisco, CA (Project Manager: 2012–2016)
Katrina modeled and analyzed corrective action plans using PLS-CADD, researching mitigation options such as conductor re-tensioning and tower raises. She prepared construction drawing packages and later acted as project manager, overseeing bid estimates, budgets, and project schedules.

Southern California Edison, NERC Encroachment Design – Los Angeles, CA (Project Engineer:
2012–2013)
Katrina performed in-field corrective action plans for mitigation based on potential violations. She verified field data and created mitigation plans with cost estimates.

Page 11557788 ends
← All documents from this meeting