Redlands Regular Meeting of 01-18-2022 Page 435 of 1274 Measuring Protocol:
1 2
3 4
5 6
Format instructions and notes:
Site ID: Well identified or State Well No.
MP: measuring point
ft NAVD88: feet above the National Vertical Datum of 1988.
Measuring Equipment ID: serial number or identifier of measuring equipment Disinfect and rinse that part of tape that was submerged below water. Dry tape and rewind.
Check circuitry of electrical tape before lowering the probe into the well by dipping probe into tap water.
Make all readings using the same indicator for consistency (light intensity or sound).
Lower electrode probe slowly into the well until the indicator shows that the circuit is closed and contact with the water surface is made. Place the nail of the index finger on the insulated wire at the MP (Measuring Point) and read the depth-to-water.
Record time of measurement. Record depth to water in the row “Measurement (feet)”. If the tape has been repaired and spliced or has a calibration correction, subtract the “Tape Correction” value from the “Measurement” value and record the difference in the row “Water Level below MP”.
Pull the tape up and make a check measurement by repeating steps 3-4. Record the check measurement in column 2. If check measurement does not agree with the original measurement within 0.02 foot, continue to make measurements until the reason of lack of agreement is determined or the results are shown to be reliable. If more than 2 measurements are made, use best judgment to select measurement most representative of field conditions.
Yucaipa-SGMA Water Level Field Form
Redlands Regular Meeting of 01-18-2022 Page 436 of 1274
WELL PRODUCTION RECORD
Date Time Well ID Totalizer Reading
(Gallons)
Instantaneous
Pumping Rate (GPM)
Estimated Pumping
Rate (GPM)
Model and Make of
Totalizer
Yucaipa-SGMA Well Production Record Page 1 of 1 2021-08-21 Redlands Regular Meeting of 01-18-2022 Page 437 of 1274
WATER QUALITY FIELD FORM
Date (YYYY/MM/DD): Site ID:
Well Type: Production / Monitoring / Private Measuring Agency/Entity:
Well Pumping? If so, how long? Is Initial Water Level Static? Method of Well Purging (see below): Site Status (see below):
Purging Equipment ID: Water Quality Meter ID:
Purge Volume Calculation:
[A] Total depth of well casing (ft bls): [C] Well Casing Inside Diameter (inches):
[B] Static depth to water, if not pumping (ft bls): [D] Length of Water Column, [A] - [B] (ft):
Purge Volume (3 Casing Volumes), ([D] * p/4 * ([C]/12)2 ) * 3 =
Time Purge Rate Temperature (o
C) pH Conductivity
( )
Oxidation-Reduction
Potential (mV)
Dissolved Oxygen
(mg/L)
Turbidity
(NTUs)
Measured by: Comments:*
WATER QUALITY PARAMETERS
Yucaipa-SGMA Water Quality Field Form
Redlands Regular Meeting of 01-18-2022 Page 438 of 1274
WATER QUALITY FIELD FORM
NOTES:
Purging and Sampling Protocol:
1 2
3 4
5 6
7 Format instructions and notes:
Site ID: Well identifier or State Well No.
ft bls: feet below land surface
Purging Equipment ID/description: serial number or identifier of measuring equipment The Chain-of-Custory form should be filled out as the sample is collected and preserved.
If the well has a dedicated pump and it is operating, ensure that it has been operating consistently and at least three (3) casing volumes have been pumped. If not, note pumping rate and time to purge 3 casing volumes before collecting representative samples.
Measure and record water quality parameters through purging process.
If the well does not have a dedicate pump, then use purging equipment (e.g., portable submersible pump, bailer) to purge well. If using a portable submersible pump, lower pump to depth (consistent with previous smapling events) that ensures pump will not draw water level down to intake and, if possible, is positioned above the top of the well screen.
Ensure that portable purging equipment is properly decontaminated prior to use. Any decontamination must be documented (e.g., material used to decontaminate equipment, rinsing method, containment of waste, waste disposal).
Measure and/or record purge rate periodically. Collect purge sample to measure parameters periodically. Parameters should stablize (within 10% of previous three readings) before collecting the water quality sample.
Use the appropriate sample containers provided by the analytical laboratory. Sample containers shoud be labeled prior to sample collection. The sample label should include: Sample ID (often well ID), sample date and time of collection, sampling personnel, preservative used (if any), and the analytical method to be used on the sample.
All samples should be preserved as soon as possible in an ice chest containing ice. The samples should be chilled and maintained at 4 o
C.
*Comments should include quality concerns and changes that affect the representativeness of the measurements (e.g., changes in pump placement, ownership, well operations, access to sampling port, etc.) Site Status: D = dry; O = obstructed; P = pumping; R = recently pumped and recovering; NP = nearby pumping; V = foreign substance; WD = well destroyed; SW = surface water effects; Z = other; S = Static Method of Well Purging: B = bailer; D = dedicated submersible pump; P = portable submersible pump; T = dedicated turbine pump; S = peristaltic pump.
Yucaipa-SGMA Water Quality Field Form
Redlands Regular Meeting of 01-18-2022 Page 439 of 1274 Redlands Regular Meeting of 01-18-2022 Page 440 of 1274 State of California
Edmund G. Brown Jr., Governor
California Natural Resources Agency
John Laird, Secretary for Natural Resources
Department of Water Resources
Mark W. Cowin, Director
Carl A. Torgersen, Chief Deputy Director
Office of the Chief Counsel Public Affairs Office Government and Community Liaison Spencer Kenner Ed Wilson Anecita S. Agustinez
Office of Workforce Equality Policy Advisor Legislative Affairs Office Stephanie Varrelman Waiman Yip Kasey Schimke, Ass’t Dir.
Deputy Directors
Gary Bardini Integrated Water Management
William Croyle Statewide Emergency Preparedness and Security Mark Anderson State Water Project
John Pacheco (Acting) California Energy Resources Scheduling Kathie Kishaba Business Operations
Taryn Ravazzini Special Initiatives
Division of Integrated Regional Water Management
Arthur Hinojosa Jr., Chief
Prepared under the direction of:
David Gutierrez, Sustainable Groundwater Management Program Manager Rich Juricich, Sustainable Groundwater Management Branch Prepared by:
Trevor Joseph, BMP Project Manager
Timothy Godwin
Dan McManus
Mark Nordberg
Heather Shannon
Steven Springhorn
With assistance from:
DWR Region Office Staff
Redlands Regular Meeting of 01-18-2022 Page 441 of 1274 Groundwater Monitoring Protocols, Standards, and Sites
Best Management Practice
1. OBJECTIVE
The objective of this Best Management Practice (BMP) is to assist in the development of Monitoring Protocols. The California Department of Water Resources (the Department or DWR) has developed this document as part of the obligation in the Technical Assistance chapter (Chapter 7) of the Sustainable Groundwater Management Act (SGMA) to support the long-term sustainability of California’s groundwater basins.
Information provided in this BMP provides technical assistance to Groundwater Sustainability Agencies (GSAs) and other stakeholders to aid in the establishment of consistent data collection processes and procedures. In addition, this BMP can be used by GSAs to adopt a set of sampling and measuring procedures that will yield similar data regardless of the monitoring personnel. Finally, this BMP identifies available resources to support the development of monitoring protocols.
This BMP includes the following sections:
1. Objective. A brief description of how and where monitoring protocols are required under SGMA and the overall objective of this BMP.
2. Use and Limitations. A brief description of the use and limitations of this BMP.
3. Monitoring Protocol Fundamentals. A description of the general approach and background of groundwater monitoring protocols.
4. Relationship of Monitoring Protocols to other BMPs. A description of how this BMP is connected with other BMPS.
5. Technical Assistance. Technical content providing guidance for regulatory sections.
6. Key Definitions. Descriptions of definitions identified in the GSP Regulations or SGMA.
7. Related Materials. References and other materials that provide supporting information related to the development of Groundwater Monitoring Protocols.
Redlands Regular Meeting of 01-18-2022 Page 442 of 1274
2. USE AND LIMITATIONS
BMPs developed by the Department provide technical guidance to GSAs and other stakeholders. Practices described in these BMPs do not replace the GSP Regulations, nor do they create new requirements or obligations for GSAs or other stakeholders. In addition, using this BMP to develop a GSP does not equate to an approval determination by the Department. All references to GSP Regulations relate to Title 23 of the California Code of Regulations (CCR), Division 2, Chapter 1.5, and Subchapter 2. All references to SGMA relate to California Water Code sections in Division 6, Part 2.74.
3. MONITORING PROTOCOL FUNDAMENTALS
Establishing data collection protocols that are based on best available scientific methods is essential. Protocols that can be applied consistently across all basins will likely yield comparable data. Consistency of data collection methods reduces uncertainty in the comparison of data and facilitates more accurate communication within basins as well as between basins.
Basic minimum technical standards of accuracy lead to quality data that will better support implementation of GSPs.
4. RELATIONSHIP OF MONITORING PROTOCOL TO OTHER BMPS
Groundwater monitoring is a fundamental component of SGMA, as each GSP must include a sufficient network of data that demonstrates measured progress toward the achievement of the sustainability goal for each basin. For this reason, a standard set of protocols need to be developed and utilized.
It is important that data is developed in a manner consistent with the basin setting, planning, and projects/management actions steps identified on Figure 1 and the GSP Regulations. The inclusion of monitoring protocols in the GSP Regulations also emphasizes the importance of quality empirical data to support GSPs and provide comparable information from basin to basin.
Figure 1 provides a logical progression for the development of a GSP and illustrates how monitoring protocols are linked to other related BMPs. This figure also shows the context of the BMPs as they relate to various steps to sustainability as outlined in the GSP Regulations. The monitoring protocol BMP is part of the Monitoring step identified in Figure 1.
Redlands Regular Meeting of 01-18-2022 Page 443 of 1274 Figure 1 – Logical Progression of Basin Activities Needed to Increase Basin Sustainability
Redlands Regular Meeting of 01-18-2022 Page 444 of 1274
5. TECHNICAL ASSISTANCE
The GSP Regulations specifically call out the need to utilize protocols identified in this BMP, or develop similar protocols. The following technical protocols provide guidance based upon existing professional standards and are commonly adopted in various groundwater-related programs. They provide clear techniques that yield quality data for use in the various components of the GSP. They can be further elaborated on by individual GSAs in the form of standard operating procedures which reflect specific local requirements and conditions. While many methodologies are suggested in this BMP, it should be understood that qualified professional judgment should be used to meet the specific monitoring needs.
The following BMPs may be incorporated into a GSP’s monitoring protocols section for collecting groundwater elevation data. A GSP that adopts protocols that deviate from these BMPs must demonstrate that they will yield comparable data.
PROTOCOLS FOR ESTABLISHING A MONITORING PROGRAM
The protocol for establishment of a monitoring program should be evaluated in conjunction with the Monitoring Network and Identification of Data Gaps BMP and other BMPs. Monitoring protocols must take into consideration the Hydrogeologic Conceptual Model, Water Budget, and Modeling BMPs when considering the data needs to meet GSP objectives and the sustainability goal.
It is suggested that each GSP incorporate the Data Quality Objective (DQO) process following the U.S. EPA Guidance on Systematic Planning Using the Data Quality Objectives Process (EPA, 2006). Although strict adherence to this method is not required, it does provide a robust approach to consider and assures that data is collected with a specific purpose in mind, and efforts for monitoring are as efficient as possible to achieve the objectives of the GSP and compliance with the GSP Regulations. 23 CCR §352.2. Monitoring Protocols. Each Plan shall include monitoring protocols adopted by the Agency for data collection and management, as follows:
(a) Monitoring protocols shall be developed according to best management practices. (b) The Agency may rely on monitoring protocols included as part of the best management practices developed by the Department, or may adopt similar monitoring protocols that will yield comparable data.
(c) Monitoring protocols shall be reviewed at least every five years as part of the periodic evaluation of the Plan, and modified as necessary.
Redlands Regular Meeting of 01-18-2022 Page 445 of 1274 The DQO process presents a method that can be applied directly to the sustainability criteria quantitative requirements through the following steps.
1. State the problem – Define sustainability indicators and planning considerations of the GSP and sustainability goal.
2. Identify the goal – Describe the quantitative measurable objectives and minimum thresholds for each of the sustainability indicators.
3. Identify the inputs – Describe the data necessary to evaluate the sustainability indicators and other GSP requirements (i.e. water budget).
4. Define the boundaries of the study – This is commonly the extent of the Bulletin 118 groundwater basin or subbasin, unless multiple GSPs are prepared for a given basin. In that case, evaluation of the coordination plan and specifically how the monitoring will be comparable and meet the sustainability goals for the entire basin.
5. Develop an analytical approach – Determine how the quantitative sustainability indicators will be evaluated (i.e. are special analytical methods required that have specific data needs).
6. Specify performance or acceptance criteria – Determine what quality the data must have to achieve the objective and provide some assurance that the analysis is accurate and reliable.
7. Develop a plan for obtaining data – Once the objectives are known determine how these data should be collected. Existing data sources should be used to the greatest extent possible.
These steps of the DQO process should be used to guide GSAs to develop the most efficient monitoring process to meet the measurable objectives of the GSP and the sustainability goal. The DQO process is an iterative process and should be evaluated regularly to improve monitoring efficiencies and meet changing planning and project needs. Following the DQO process, GSAs should also include a data quality control and quality assurance plan to guide the collection of data.
Many monitoring programs already exist as part of ongoing groundwater management or other programs. To the extent possible, the use of existing monitoring data and programs should be utilized to meet the needs for characterization, historical record documentation, and continued monitoring for the SGMA program. However, an evaluation of the existing monitoring data should be performed to assure the data being collected meets the DQOs, regulatory requirements, and data collection protocol described in this BMP. While this BMP provides guidance for collection of various Redlands Regular Meeting of 01-18-2022 Page 446 of 1274 regulatory based requirements, there is flexibility among the various methodologies available to meet the DQOs based upon professional judgment (local conditions or project needs).
At a minimum, for each monitoring site, the following information or procedure should be collected and documented:
• Long-term access agreements. Access agreements should include year-round site access to allow for increased monitoring frequency.
• A unique identifier that includes a general written description of the site location, date established, access instructions and point of contact (if necessary), type of information to be collected, latitude, longitude, and elevation. Each monitoring location should also track all modifications to the site in a modification log.
PROTOCOLS FOR MEASURING GROUNDWATER LEVELS
This section presents considerations for the methodology of collection of groundwater level data such that it meets the requirements of the GSP Regulations and the DQOs of the specific GSP. Groundwater levels are a fundamental measure of the status of groundwater conditions within a basin. In many cases, relationships of the sustainability indicators may be able to be correlated with groundwater levels. The quality of this data must consider the specific aquifer being monitored and the methodology for collecting these levels.
The following considerations for groundwater level measuring protocols should ensure the following:
• Groundwater level data are taken from the correct location, well ID, and screen interval depth
• Groundwater level data are accurate and reproducible
• Groundwater level data represent conditions that inform appropriate basin management DQOs
• All salient information is recorded to correct, if necessary, and compare data • Data are handled in a way that ensures data integrity Redlands Regular Meeting of 01-18-2022 Page 447 of 1274 General Well Monitoring Information
The following presents considerations for collection of water level data that include regulatory required components as well as those which are recommended. • Groundwater elevation data will form the basis of basin-wide water-table and piezometric maps, and should approximate conditions at a discrete period in time. Therefore, all groundwater levels in a basin should be collected within as short a time as possible, preferably within a 1 to 2 week period. • Depth to groundwater must be measured relative to an established Reference Point (RP) on the well casing. The RP is usually identified with a permanent marker, paint spot, or a notch in the lip of the well casing. By convention in open casing monitoring wells, the RP reference point is located on the north side of the well casing. If no mark is apparent, the person performing the measurement should measure the depth to groundwater from the north side of the top of the well casing.
• The elevation of the RP of each well must be surveyed to the North American Vertical Datum of 1988 (NAVD88), or a local datum that can be converted to NAVD88. The elevation of the RP must be accurate to within 0.5 foot. It is preferable for the RP elevation to be accurate to 0.1 foot or less. Survey grade global navigation satellite system (GNSS) global positioning system (GPS) equipment can achieve similar vertical accuracy when corrected. Guidance for use of GPS can be found at USGS http://water.usgs.gov/osw/gps/. Hand-held GPS units likely will not produce reliable vertical elevation measurement accurate enough for the casing elevation consistent with the DQOs and regulatory requirements.
• The sampler should remove the appropriate cap, lid, or plug that covers the monitoring access point listening for pressure release. If a release is observed, the measurement should follow a period of time to allow the water level to equilibrate.
• Depth to groundwater must be measured to an accuracy of 0.1 foot below the RP.
It is preferable to measure depth to groundwater to an accuracy of 0.01 foot. Air lines and acoustic sounders may not provide the required accuracy of 0.1 foot. • The water level meter should be decontaminated after measuring each well.
Redlands Regular Meeting of 01-18-2022 Page 448 of 1274 Where existing wells do not meet the base standard as described in the GSP Regulations or the considerations provided above, new monitoring wells may need to be constructed to meet the DQOs of the GSP. The design, installation, and documentation of new monitoring wells must consider the following:
• Construction consistent with California Well Standards as described in Bulletins 74-81 and 74-90, and local permitting agency standards of practice. • Logging of borehole cuttings under the supervision of a California Professional Geologist and described consistent with the Unified Soil Classification System methods according to ASTM standard D2487-11.
• Written criteria for logging of borehole cuttings for comparison to known geologic formations, principal aquifers and aquitards/aquicludes, or specific marker beds to aid in consistent stratigraphic correlation within and across basins.
• Geophysical surveys of boreholes to aid in consistency of logging practices.
Methodologies should include resistivity, spontaneous potential, spectral gamma, or other methods as appropriate for the conditions. Selection of geophysical methods should be based upon the opinion of a professional geologist or professional engineer, and address the DQOs for the specific borehole and characterization needs.
• Prepare and submit State well completion reports according to the requirements of §13752. Well completion report documentation should include geophysical logs, detailed geologic log, and formation identification as attachments. An example well completion as-built log is illustrated in Figure 2. DWR well completion reports can be filed directly at the Online System for Well Completion Reports (OSWCR) http://water.ca.gov/oswcr/index.cfm.
Redlands Regular Meeting of 01-18-2022 Page 449 of 1274 Figure 2 – Example As-Built Multi-Completion Monitoring Well Log Redlands Regular Meeting of 01-18-2022 Page 450 of 1274 Measuring Groundwater Levels
Well construction, anticipated groundwater level, groundwater level measuring equipment, field conditions, and well operations should be considered prior collection of the groundwater level measurement. The USGS Groundwater Technical Procedures (Cunningham and Schalk, 2011) provide a thorough set of procedures which can be used to establish specific Standard Operating Procedures (SOPs) for a local agency.
Figure 3 illustrates a typical groundwater level measuring event and simultaneous pressure transducer download.
Figure 3 – Collection of Water Level Measurement and Pressure Transducer Download
The following points provide a general approach for collecting groundwater level measurements:
• Measure depth to water in the well using procedures appropriate for the measuring device. Equipment must be operated and maintained in accordance with manufacturer’s instructions. Groundwater levels should be measured to the nearest 0.01 foot relative to the RP.
• For measuring wells that are under pressure, allow a period of time for the groundwater levels to stabilize. In these cases, multiple measurements should be collected to ensure the well has reached equilibrium such that no significant changes in water level are observed. Every effort should be made to ensure that a representative stable depth to groundwater is recorded. If a well does not stabilize, the quality of the value should be appropriately qualified as a Redlands Regular Meeting of 01-18-2022 Page 451 of 1274 questionable measurement. In the event that a well is artesian, site specific procedures should be developed to collect accurate information and be protective of safety conditions associated with a pressurized well. In many cases, an extension pipe may be adequate to stabilize head in the well. Record the dimension of the extension and document measurements and configuration. • The sampler should calculate the groundwater elevation as:
𝐺𝐺𝐺𝐺𝐺𝐺 = 𝑅𝑅𝑅𝑅 − 𝐷𝐷𝐷𝐷
Where:
GWE = Groundwater Elevation
RPE = Reference Point Elevation
DTW = Depth to Water
The sampler must ensure that all measurements are in consistent units of feet, tenths of feet, and hundredths of feet. Measurements and RPEs should not be recorded in feet and inches.
Recording Groundwater Levels
• The sampler should record the well identifier, date, time (24-hour format), RPE, height of RP above or below ground surface, DTW, GWE, and comments regarding any factors that may influence the depth to water readings such as weather, nearby irrigation, flooding, potential for tidal influence, or well condition. If there is a questionable measurement or the measurement cannot be obtained, it should be noted. An example of a field sheet with the required information is shown in Figure 4. It includes questionable measurement and no measurement codes that should be noted. This field sheet is provided as an example. Standardized field forms should be used for all data collection. The aforementioned USGS Groundwater Technical Procedures offers a number of example forms.
• The sampler should replace any well caps or plugs, and lock any well buildings or covers.
• All data should be entered into the GSA data management system (DMS) as soon as possible. Care should be taken to avoid data entry mistakes and the entries should be checked by a second person for compliance with the DQOs.
Redlands Regular Meeting of 01-18-2022 Page 452 of 1274 Figure 4 – Example of Water Level Well Data Field Collection Form Redlands Regular Meeting of 01-18-2022 Page 453 of 1274 Pressure Transducers
Groundwater levels and/or calculated groundwater elevations may be recorded using pressure transducers equipped with data loggers installed in monitoring wells. When installing pressure transducers, care must be exercised to ensure that the data recorded by the transducers is confirmed with hand measurements.
The following general protocols must be followed when installing a pressure transducer in a monitoring well:
• The sampler must use an electronic sounder or chalked steel tape and follow the protocols listed above to measure the groundwater level and calculate the groundwater elevation in the monitoring well to properly program and reference the installation. It is recommended that transducers record measured groundwater level to conserve data capacity; groundwater elevations can be calculated at a later time after downloading.
• The sampler must note the well identifier, the associated transducer serial number, transducer range, transducer accuracy, and cable serial number. • Transducers must be able to record groundwater levels with an accuracy of at least 0.1 foot. Professional judgment should be exercised to ensure that the data being collected is meeting the DQO and that the instrument is capable.
Consideration of the battery life, data storage capacity, range of groundwater level fluctuations, and natural pressure drift of the transducers should be included in the evaluation.
• The sampler must note whether the pressure transducer uses a vented or nonvented cable for barometric compensation. Vented cables are preferred, but nonvented units provide accurate data if properly corrected for natural barometric pressure changes. This requires the consistent logging of barometric pressures to coincide with measurement intervals.
• Follow manufacturer specifications for installation, calibration, data logging intervals, battery life, correction procedure (if non-vented cables used), and anticipated life expectancy to assure that DQOs are being met for the GSP. • Secure the cable to the well head with a well dock or another reliable method.
Mark the cable at the elevation of the reference point with tape or an indelible marker. This will allow estimates of future cable slippage. • The transducer data should periodically be checked against hand measured groundwater levels to monitor electronic drift or cable movement. This should happen during routine site visits, at least annually or as necessary to maintain data integrity.
Redlands Regular Meeting of 01-18-2022 Page 454 of 1274 • The data should be downloaded as necessary to ensure no data is lost and entered into the basin’s DMS following the QA/QC program established for the GSP. Data collected with non-vented data logger cables should be corrected for atmospheric barometric pressure changes, as appropriate. After the sampler is confident that the transducer data have been safely downloaded and stored, the data should be deleted from the data logger to ensure that adequate data logger memory remains.
PROTOCOLS FOR SAMPLING GROUNDWATER QUALITY
The following protocols can be incorporated into a GSP’s monitoring protocols for collecting groundwater quality data. More detailed sampling procedures and protocols are included in the standards and guidance documents listed at the end of this BMP. A GSP that adopts protocols that deviate from these BMPs must demonstrate that the adopted protocols will yield comparable data.
In general, the use of existing water quality data within the basin should be done to the greatest extent possible if it achieves the DQOs for the GSP. In some cases it may be necessary to collect additional water quality data to support monitoring programs or evaluate specific projects. The USGS National Field Manual for the Collection of Water Quality Data (Wilde, 2005) should be used to guide the collection of reliable data. Figure 5 illustrates a typical groundwater quality sampling setup.
Figure 5 – Typical Groundwater Quality Sampling Event
Redlands Regular Meeting of 01-18-2022 Page 455 of 1274 All analyses should be performed by a laboratory certified under the State Environmental Laboratory Accreditation Program. The specific analytical methods are beyond the scope of this BMP, but should be commiserate with other programs evaluating water quality within the basin for comparative purposes.
Groundwater quality sampling protocols should ensure that:
• Groundwater quality data are taken from the correct location • Groundwater quality data are accurate and reproducible • Groundwater quality data represent conditions that inform appropriate basin management and are consistent with the DQOs
• All salient information is recorded to normalize, if necessary, and compare data • Data are handled in a way that ensures data integrity The following points are general guidance in addition to the techniques presented in the previously mentioned USGS National Field Manual for the Collection of Water Quality Data.
Standardized protocols include the following:
• Prior to sampling, the sampler must contact the laboratory to schedule laboratory time, obtain appropriate sample containers, and clarify any sample holding times or sample preservation requirements.
• Each well used for groundwater quality monitoring must have a unique identifier. This identifier must appear on the well housing or the well casing to avoid confusion.
• In the case of wells with dedicated pumps, samples should be collected at or near the wellhead. Samples should not be collected from storage tanks, at the end of long pipe runs, or after any water treatment.
• The sampler should clean the sampling port and/or sampling equipment and the sampling port and/or sampling equipment must be free of any contaminants. The sampler must decontaminate sampling equipment between sampling locations or wells to avoid cross-contamination between samples.
• The groundwater elevation in the well should be measured following appropriate protocols described above in the groundwater level measuring protocols. • For any well not equipped with low-flow or passive sampling equipment, an adequate volume of water should be purged from the well to ensure that the groundwater sample is representative of ambient groundwater and not stagnant water in the well casing. Purging three well casing volumes is generally Redlands Regular Meeting of 01-18-2022 Page 456 of 1274 considered adequate. Professional judgment should be used to determine the proper configuration of the sampling equipment with respect to well construction such that a representative ambient groundwater sample is collected. If pumping causes a well to be evacuated (go dry), document the condition and allow well to recover to within 90% of original level prior to sampling. Professional judgment should be exercised as to whether the sample will meet the DQOs and adjusted as necessary.
• Field parameters of pH, electrical conductivity, and temperature should be collected for each sample. Field parameters should be evaluated during the purging of the well and should stabilize prior to sampling. Measurements of pH should only be measured in the field, lab pH analysis are typically unachievable due to short hold times. Other parameters, such as oxidation-reduction potential (ORP), dissolved oxygen (DO) (in situ measurements preferable), or turbidity, may also be useful for meeting DQOs of GSP and assessing purge conditions. All field instruments should be calibrated daily and evaluated for drift throughout the day.
• Sample containers should be labeled prior to sample collection. The sample label must include: sample ID (often well ID), sample date and time, sample personnel, sample location, preservative used, and analytes and analytical method. • Samples should be collected under laminar flow conditions. This may require reducing pumping rates prior to sample collection.
• Samples should be collected according to appropriate standards such as those listed in the Standard Methods for the Examination of Water and Wastewater, USGS National Field Manual for the Collection of Water Quality Data, or other appropriate guidance. The specific sample collection procedure should reflect the type of analysis to be performed and DQOs.
• All samples requiring preservation must be preserved as soon as practically possible, ideally at the time of sample collection. Ensure that samples are appropriately filtered as recommended for the specific analyte. Entrained solids can be dissolved by preservative leading to inconsistent results of dissolve analytes. Specifically, samples to be analyzed for metals should be field-filtered prior to preservation; do not collect an unfiltered sample in a preserved container.
• Samples should be chilled and maintained at 4 °C to prevent degradation of the sample. The laboratory’s Quality Assurance Management Plan should detail appropriate chilling and shipping requirements.
Redlands Regular Meeting of 01-18-2022 Page 457 of 1274 • Samples must be shipped under chain of custody documentation to the appropriate laboratory promptly to avoid violating holding time restrictions. • Instruct the laboratory to use reporting limits that are equal to or less than the applicable DQOs or regional water quality objectives/screening levels.
Special protocols for low-flow sampling equipment
In addition to the protocols listed above, sampling using low-flow sample equipment should adopt the following protocols derived from EPA’s Low-flow (minimal drawdown) ground-water sampling procedures (Puls and Barcelona, 1996). These protocols apply to low-flow sampling equipment that generally pumps between 0.1 and 0.5 liters per minute. These protocols are not intended for bailers.
Special protocols for passive sampling equipment
In addition to the protocols listed above, passive diffusion samplers should follow protocols set forth in USGS Fact Sheet 088-00.
PROTOCOLS FOR MONITORING SEAWATER INTRUSION
Monitoring seawater intrusion requires analysis of the chloride concentrations within groundwater of each principal aquifer subject to seawater intrusion. While no significant standardized approach exists, the methodologies described above for degraded water quality can be applied for the collection of groundwater samples. In addition to the protocol described above, the following protocols should be followed:
• Water quality samples should be collected and analyzed at least semi-annually.
Samples will be analyzed for dissolved chloride at a minimum. It may be beneficial to include analyses of iodide and bromide to aid in determination of salinity source. More frequent sampling may be necessary to meet DQOs of GSP.
The development of surrogate measures of chloride concentration may facilitate cost-effective means to monitor more frequently to observe the range of conditions and variability of the flow dynamics controlling seawater intrusion. • Groundwater levels will be collected at a frequency adequate to characterize changes in head in the vicinity of the leading edge of degraded water quality in each principal aquifer. Frequency may need to be increased in areas of known preferential pathways, groundwater pumping, or efficacy evaluation of mitigation projects.
• The use of geophysical surveys, electrical resistivity, or other methods may provide for identification of preferential pathways and optimize monitoring well placement and evaluation of the seawater intrusion front. Professional judgment Redlands Regular Meeting of 01-18-2022 Page 458 of 1274 should be exercised to determine the appropriate methodology and whether the DQOs for the GSP would be met.
PROTOCOLS FOR MEASURING STREAMFLOW
Monitoring of streamflow is necessary for incorporation into water budget analysis and for use in evaluation of stream depletions associated with groundwater extractions. The use of existing monitoring locations should be incorporated to the greatest extent possible. Many of these streamflow monitoring locations currently follow the protocol described below.
Establishment of new streamflow discharge sites should consider the existing network and the objectives of the new location. Professional judgment should be used to determine the appropriate permitting that may be necessary for the installation of any monitoring locations along surface water bodies. Regular frequent access will be necessary to these sites for the development of ratings curves and maintenance of equipment.
To establish a new streamflow monitoring station special consideration must be made in the field to select an appropriate location for measuring discharge. Once a site is selected, development of a relationship of stream stage to discharge will be necessary to provide continuous estimates of streamflow. Several measurements of discharge at a variety of stream stages will be necessary to develop the ratings curve correlating stage to discharge. The use of Acoustic Doppler Current Profilers (ADCPs) can provide accurate estimates of discharge in the correct settings. Professional judgment must be exercised to determine the appropriate methodology. Following development of the ratings curve a simple stilling well and pressure transducer with data logger can be used to evaluate stage on a frequent basis. A simple stilling well and staff gage is illustrated in Figure 6.
Streamflow measurements should be collected, analyzed, and reported in accordance with the procedures outlined in USGS Water Supply Paper 2175, Volume 1. – Measurement of Stage Discharge and Volume 2. – Computation of Discharge. This methodology is currently being used by both the USGS and DWR for existing streamflow monitoring throughout the State.
Redlands Regular Meeting of 01-18-2022 Page 459 of 1274 Figure 6 – Simple Stilling Well and Staff Gage Setup
PROTOCOLS FOR MEASURING SUBSIDENCE
Evaluating and monitoring inelastic land subsidence can utilize multiple data sources to evaluate the specific conditions and associated causes. To the extent possible, the use of existing data should be utilized. Subsidence can be estimated from numerous techniques, they include: level surveying tied to known stable benchmarks or benchmarks located outside the area being studied for possible subsidence; installing and tracking changes in borehole extensometers; obtaining data from continuous GPS (CGPS) locations, static GPS surveys or Real-Time-Kinematic (RTK) surveys; or analyzing Interferometric Synthetic Aperture Radar (InSAR) data. No standard procedures exist for collecting data from the potential subsidence monitoring approaches. However, an approach may include:
• Identification of land subsidence conditions.
o Evaluate existing regional long-term leveling surveys of regional infrastructure, i.e. roadways, railroads, canals, and levees. o Inspect existing county and State well records where collapse has been noted for well repairs or replacement.
o Determine if significant fine-grained layers are present such that the potential for collapse of the units could occur should there be significant depressurization of the aquifer system.
Redlands Regular Meeting of 01-18-2022 Page 460 of 1274 o Inspect geologic logs and the hydrogeologic conceptual model to aid in identification of specific units of concern.
o Collect regional remote-sensing information such as InSAR, commonly provided by USGS and NASA. Data availability is currently limited, but future resources are being developed.
• Monitor regions of suspected subsidence where potential exists. o Establish CGPS network to evaluate changes in land surface elevation. o Establish leveling surveys transects to observe changes in land surface elevation.
o Establish extensometer network to observe land subsidence. An example of a typical extensometer design is illustrated in Figure 7. There are a variety of extensometer designs and they should be selected based on the specific DQOs.
Various standards and guidance documents for collecting data include:
• Leveling surveys must follow surveying standards set out in the California Department of Transportation’s Caltrans Surveys Manual. • GPS surveys must follow surveying standards set out in the California Department of Transportation’s Caltrans Surveys Manual. • USGS has been performing subsidence surveys within several areas of California.
These studies are sound examples for appropriate methods and should be utilized to the extent possible and where available:
o http://ca.water.usgs.gov/land_subsidence/california-subsidencemeasuring.html • Instruments installed in borehole extensometers must follow the manufacturer’s instructions for installation, care, and calibration.
• Availability of InSAR data is improving and will increase as programs are developed. This method requires expertise in analysis of the raw data and will likely be made available as an interpretative report for specific regions.
Redlands Regular Meeting of 01-18-2022 Page 461 of 1274 Figure 7 – Simplified Extensometer Diagram
Redlands Regular Meeting of 01-18-2022 Page 462 of 1274
6. KEY DEFINITIONS
The key definitions and sections related to Groundwater Monitoring Protocols, Standards, and Sites outlined in applicable SGMA code and regulations are provided below for reference.
Groundwater Sustainability Plan Regulations (California Code of Regulations §351) • §351(h) “Best available science” refers to the use of sufficient and credible information and data, specific to the decision being made and the time frame available for making that decision, that is consistent with scientific and engineering professional standards of practice.
• §351(i) “Best management practice” refers to a practice, or combination of practices, that are designed to achieve sustainable groundwater management and have been determined to be technologically and economically effective, practicable, and based on best available science.
Monitoring Protocols Reference
§352.2. Monitoring Protocols
Each Plan shall include monitoring protocols adopted by the Agency for data collection and management, as follows:
(a) Monitoring protocols shall be developed according to best management practices.
(b) The Agency may rely on monitoring protocols included as part of the best management practices developed by the Department, or may adopt similar monitoring protocols that will yield comparable data.
(c) Monitoring protocols shall be reviewed at least every five years as part of the periodic evaluation of the Plan, and modified as necessary.
SGMA Reference
§10727.2. Required Plan Elements
(f) Monitoring protocols that are designed to detect changes in groundwater levels, groundwater quality, inelastic surface subsidence for basins for which subsidence has been identified as a potential problem, and flow and quality of surface water that directly affect groundwater levels or quality or are caused by groundwater extraction in the basin. The monitoring protocols shall be designed to generate information that promotes efficient and effective groundwater management.
Redlands Regular Meeting of 01-18-2022 Page 463 of 1274
7. RELATED MATERIALS
CASE STUDIES
Luhdorff & Scalmanini Consulting Engineers, J.W. Borchers, M. Carpenter. 2014. Land Subsidence from Groundwater Use in California. Full Report of Findings prepared for California Water Foundation. April 2014. 151 p.
http://ca.water.usgs.gov/land_subsidence/california-subsidence-cause-effect.html Faunt, C.C., M. Sneed, J. Traum, and J.T. Brandt, 2015. Water availability and land subsidence in the Central Valley, California, USA. Hydrogeol J (2016) 24: 675. doi:10.1007/s10040-015-1339-x.
https://pubs.er.usgs.gov/publication/701605
Poland, J.F., B.E. Lofgren, R.L. Ireland, and R.G. Pugh, 1975. Land subsidence in the San Joaquin Valley, California, as of 1972; US Geological Survey Professional Paper 437-H; prepared in cooperation with the California Department of Water Resources, 87 p. http://pubs.usgs.gov/pp/0437h/report.pdf
Sneed, M., J.T. Brandt, and M. Solt, 2013. Land subsidence along the Delta-Mendota Canal in the northern part of the San Joaquin Valley, California, 2003-10; USGS Scientific Investigations Report 2013-5142, prepared in cooperation with U.S. Bureau of Reclamation and the San Luis and Delta-Mendota Water Authority. https://pubs.er.usgs.gov/publication/sir20135142
Sneed, M., J.T. Brandt, and M. Solt, 2014. Land subsidence, groundwater levels, and geology in the Coachella Valley, California, 1993–2010: U.S. Geological Survey, Scientific Investigations Report 2014–5075, 62 p.
http://dx.doi.org/10.3133/sir20145075.
STANDARDS
California Department of Transportation, various dates. Caltrans Surveys Manual. http://www.dot.ca.gov/hq/row/landsurveys/SurveysManual/Manual_TOC.html U.S. Environmental Protection Agency, 2006. Guidance on Systematic Planning Using the Data Quality Objectives Process, EPA QA/G-4
https://www.epa.gov/sites/production/files/documents/guidance_systematic_planning_ dqo_process.pdf
Redlands Regular Meeting of 01-18-2022 Page 464 of 1274 Rice, E.W., R.B. Baire, A.D. Eaton, and L.S. Clesceri ed. 2012. Standard methods for the examination of water and wastewater. Washington, DC: American Public Health Association, American Water Works Association, and Water Environment Federation.
GUIDANCE
Barcelona, M.J., J.P. Gibb, J.A. Helfrich, and E.E.Graske. 1985. Practical Guide for GroundWater Sampling. Illinois State Water Survey, Champaign, Illinois, 103 pages. www.orau.org/ptp/PTP%20Library/library/epa/samplings/pracgw.pdf Buchanan, T.J., and W.P. Somers, 1969. Discharge measurements at gaging stations; techniques of water-resources investigations of the United States Geologic Survey chapter A8, Washington D.C. http://pubs.usgs.gov/twri/twri3a8/html/pdf.html Cunningham, W.L., and Schalk, C.W., comps., 2011, Groundwater technical procedures of the U.S. Geological Survey: U.S. Geological Survey Techniques and Methods 1–A1. https://pubs.usgs.gov/tm/1a1/pdf/tm1-a1.pdf
California Department of Water Resources, 2010. Groundwater elevation monitoring guidelines.
http://www.water.ca.gov/groundwater/casgem/pdfs/CASGEM%20DWR%20GW%20Gu idelines%20Final%20121510.pdf
Holmes, R.R. Jr., P.J. Terrio, M.A. Harris, and P.C. Mills, 2001. Introduction to field methods for hydrologic and environmental studies, open-file report 01-50, USGS, Urbana, Illinois, 241 p. https://pubs.er.usgs.gov/publication/ofr0150 Puls, R.W., and Barcelona, M.J., 1996, Low-Flow (Minimal Drawdown) Ground-Water Sampling Procedures; US EPA, Ground Water Issue EPA/540/S-95/504. https://www.epa.gov/sites/production/files/2015-06/documents/lwflw2a.pdf Rantz, S.E., and others, 1982. Measurement and computation of streamflow; U.S. Geological Survey, Water Supply Paper 2175. http://pubs.usgs.gov/wsp/wsp2175/#table Subcommittee on Ground Water of the Advisory Committee on Water Information, 2013. A national framework for ground-water monitoring in the United States. http://acwi.gov/sogw/ngwmn_framework_report_july2013.pdf Vail, J., D. France, and B. Lewis. 2013. Operating Procedure: Groundwater Sampling SESDPROC-301-R3.
Redlands Regular Meeting of 01-18-2022 Page 465 of 1274 https://www.epa.gov/sites/production/files/2015-06/documents/GroundwaterSampling.pdf Wilde, F.D., January 2005. Preparations for water sampling (ver. 2.0): U.S. Geological Survey Techniques of Water-Resources Investigations, book 9, chap. A1, http://water.usgs.gov/owq/FieldManual/compiled/NFM_complete.pdf
ONLINE RESOURCES
Online System for Well Completion Reports (OSWCR). California Department of Water Resources. http://water.ca.gov/oswcr/index.cfm
Measuring Land Subsidence web page. U.S. Geological Survey. http://ca.water.usgs.gov/land_subsidence/california-subsidence-measuring.html USGS Global Positioning Application and Practice web page. U.S. Geological Survey. http://water.usgs.gov/osw/gps/
Redlands Regular Meeting of 01-18-2022 Page 466 of 1274 California Statewide Groundwater
Elevation Monitoring (CASGEM) Program
Procedures for
Monitoring Entity Reporting
December 2010
Redlands Regular Meeting of 01-18-2022 Page 467 of 1274 CASGEM Procedures for Monitoring Entity Reporting
2 Department of Water Resources (DWR) will use the internet as the primary communication tool to notify interested parties and groundwater Monitoring Entities of the status of the CASGEM program on an ongoing basis. Information will be posted at the following website: http://www.water.ca.gov/groundwater/casgem In addition to the above-referenced website, DWR will distribute information via email. In order to be placed on the CASGEM contact list, please register your contact information at the following website: http://www.water.ca.gov/groundwater/casgem/register/ For questions about the Reporting Procedures, or other technical issues, please contact:
DWR Headquarters
Mary Scruggs
901 P Street
Sacramento, CA 95814
(916) 654-1324
[email protected]
Northern Region Office
Kelly Staton
2440 Main Street
Red Bluff, CA 96080
530-529-7344
[email protected]
North Central Region
Office
Chris Bonds
3500 Industrial Avenue
West Sacramento, CA
95691
(916) 376-9657
[email protected]
South Central Region
Office
Dane Mathis
3374 Shields Avenue
Fresno, CA 93726
(559) 230-3354
[email protected]
Southern Region Office
Tim Ross
770 Fairmont Avenue
Suite 102
Glendale, CA 91203
(818) 500-1645 x278
[email protected]
Redlands Regular Meeting of 01-18-2022 Page 468 of 1274 CASGEM Procedures for Monitoring Entity Reporting
3 TABLE OF CONTENTS
Introduction to CASGEM Program ........................................................................................................... 4 Purpose of Monitoring Entity Reporting Procedures ................................................................................ 6 CASGEM Schedule ................................................................................................................................... 7 Monitoring Entities .................................................................................................................................. 8 Roles and Responsibilities of Monitoring Entities................................................................................... 8 Requirements to Become Monitoring Entity ......................................................................................... 10 Monitoring Plans ................................................................................................................................... 14 Data Gaps .......................................................................................................................................... 15 Monitoring Sites and Timing................................................................................................................ 16 Field Methods..................................................................................................................................... 17 Data Reporting ................................................................................................................................... 17 References ............................................................................................................................................ 21 Appendix – Senate Bill 6 (7th Extraordinary Session) - Groundwater Monitoring ................................... 22 Redlands Regular Meeting of 01-18-2022 Page 469 of 1274 CASGEM Procedures for Monitoring Entity Reporting
4 INTRODUCTION TO CASGEM PROGRAM
In November 2009 Part 2.11 (Groundwater Monitoring) was added to Division 6 of the Water Code by Senate Bill 6 (7th Extraordinary Session) (SB 6), a copy of which is included in the Appendix. (All statutory references in this document are to the Water Code.) The new law directs that groundwater elevations in all basins and subbasins in California be regularly and systematically monitored, preferably by local entities, with the goal of demonstrating seasonal and long-term trends in groundwater elevations.
The Department of Water Resources (DWR) is directed to make the resulting information readily and widely available.
DWR developed the California Statewide Groundwater Elevation Monitoring (CASGEM) program in accordance with SB 6 to establish a permanent, locally-managed system to monitor groundwater elevation in California’s alluvial groundwater basins and subbasins identified in DWR Bulletin 118. The CASGEM program will rely and build on the many, established local long-term groundwater monitoring and management programs. DWR’s role is to coordinate information collected locally through the CASGEM program and to maintain the collected groundwater elevation data in a readily and widely available public database. DWR will also continue measuring its current network of groundwater monitoring wells as funding allows.
The goals of the CASGEM program are to:
Establish procedures for notification and data reporting by prospective Monitoring Entities (this document)
Verify local Monitoring Entities in accordance with the Water Code Develop an interface for local entities to enter data into a database compatible with DWR’s Water Data Library
Maintain the database and make it easily accessible to the public and local entities for use in water supply planning and management If no local entities volunteer to monitor groundwater elevations in a basin or part of a basin, DWR may be required to develop a monitoring program for that part. If DWR takes over monitoring of a basin, certain entities in the basin may not be eligible for water grants or loans administered by the state.
During August and September 2010, DWR held 10 workshops throughout the state in cooperation with Association of California Water Agencies (ACWA) to introduce the CASGEM program and explain the purpose and process of the program to local agencies and stakeholders. A copy of the DWR presentation is available on the CASGEM website (http://www.water.ca.gov/groundwater/casgem). A summary of Redlands Regular Meeting of 01-18-2022 Page 470 of 1274 CASGEM Procedures for Monitoring Entity Reporting
5 Frequently Asked Questions (FAQs), primarily from the workshops, is provided in on the CASGEM website.
DWR’s main role is to administer the CASGEM program through providing public outreach; creating and maintaining the CASGEM website and online data submittal system; and, supporting local entities through the process of becoming a Monitoring Entity and preparing Monitoring Plans. DWR will use the CASGEM website to provide up-to-date information on the program. The website will also be the access point for the online notification and data submittal systems.
Staff from the DWR regional offices will be available to assist potential Monitoring Entities with the online notification submittal process. After receiving notification from prospective Monitoring Entities, DWR will review them for completeness, verify the authority of the applying entity under Section 10927, and check for overlapping monitoring areas. DWR will advise each party on the status of their notification within three months of submittal and will work with entities to address any deficiencies in their submittals.
DWR encourages local agencies and groups to collaborate to determine who will serve as the Monitoring Entity for the area. However, if more than one party seeks to become the Monitoring Entity for the same area and overlapping monitoring area issues cannot be resolved locally, DWR will make a final determination of the Monitoring Entity for the area. DWR’s determinations will consider the order in which entities are identified in Section 10927 and other factors as described in the Water Code.
DWR will post the selection of each Monitoring Entity and its monitoring area on the CASGEM website and will notify each Monitoring Entity in writing. A map-based interface will be available for users to identify the Monitoring Entity for each basin in the state.
DWR will prepare the first status report on the CASGEM program for the Governor and Legislature by January 1, 2012. In this initial report, DWR will report on the extent of groundwater elevation monitoring within each basin. This report will include a statewide prioritization of basins based on water supply, water demand, and other factors identified in Section 10933. DWR will explore options for basins without identified monitoring, with a focus on identifying options for local monitoring. Future status reports on the CASGEM program will be prepared by DWR in years ending in 5 or 0.
Redlands Regular Meeting of 01-18-2022 Page 471 of 1274 CASGEM Procedures for Monitoring Entity Reporting
6 PURPOSE OF MONITORING ENTITY REPORTING PROCEDURES
The purpose of these procedures is to introduce the CASGEM program and its components as the framework for implementing SB 6, with particular emphasis on the initial step of establishing Monitoring Entities for each Bulletin 118 basin in the state.
A summary of the requirements of local entities to comply with the CASGEM program is presented in Table 1.
Table 1. Quick Guide for Local Entities
Determine whether you qualify as a potential Monitoring Entity (see “Requirements to become Monitoring Entity” on pages 9-13) Identify the basins within your area (see Bulletin 118) Collaborate with other local entities to identify and choose the prospective Monitoring Entity (or Entities) for your area Submit Monitoring Entity notification to DWR through CASGEM website (http://www.water.ca.gov/groundwater/casgem) on or before January 1, 2011
DWR will review the notification and advise the prospective Monitoring Entity of the status of the notification within 3 months of submittal Work with staff of the DWR regional office to address any deficiencies in the submittal
If more than one party seeks to become the Monitoring Entity for the same area, work with staff of the DWR regional office to resolve Check the CASGEM website for a listing of the selected Monitoring Entities
Develop and submit a Monitoring Plan to DWR through the CASGEM website
Staff from the DWR regional office are available to assist with the Monitoring Plan and to recommend changes
Submit monitoring data to DWR through the CASGEM website on or before January 1, 2012
Redlands Regular Meeting of 01-18-2022 Page 472 of 1274 CASGEM Procedures for Monitoring Entity Reporting
7 CASGEM SCHEDULE
A timetable for implementing the CASGEM schedule is shown above.
Redlands Regular Meeting of 01-18-2022 Page 473 of 1274 CASGEM Procedures for Monitoring Entity Reporting
8 MONITORING ENTITIES
The CASGEM program establishes the framework for collaboration between local monitoring parties and DWR to collect groundwater elevation data throughout the state’s 515 basins as defined in Bulletin 118. A Monitoring Entity is a local agency or group that voluntarily takes responsibility for conducting or coordinating groundwater elevation monitoring and reporting for all or part of a groundwater basin.
To determine if you are within a Bulletin 118 basin, please refer to maps and descriptions in Bulletin 118, available online at:
http://www.water.ca.gov/groundwater/bulletin118/gwbasin_maps_descriptions.cfm.
Geographic Information System (GIS) shapefiles of the basins are also available at this website. DWR can assist in identifying other potential local monitoring parties in each basin.
ROLES AND RESPONSIBILITIES OF MONITORING ENTITIES
Through the CASGEM program, local entities with appropriate authority may notify DWR of their intent to be a Monitoring Entity. Monitoring Entities will have specific responsibilities, including:
Coordinate with DWR to establish a Monitoring Plan
Conduct or coordinate the regular and systematic monitoring of groundwater elevations as specified in the Monitoring Plan
Submit monitoring data to DWR in a timely manner
A Monitoring Entity can perform monitoring for any number of basins or portions thereof, but no area can have more than one Monitoring Entity. While the Monitoring Entity is responsible for compiling the data and submitting it to DWR for a particular area, the actual measurements can be taken by any number of agencies that would work under the direction of the Monitoring Entity. (Cooperating agencies would submit data to the Monitoring Entity, not to DWR.) Thus, assuming there are no overlapping areas or gaps in basin coverage for a given area, there are three possible basic scenarios, illustrated in Figure 1:
A single Monitoring Entity that collects and reports groundwater elevation data for the entire basin (Scenario A);
Multiple Monitoring Entities that collect and report groundwater elevation data for their portion of the basin (Scenario B); or
Redlands Regular Meeting of 01-18-2022 Page 474 of 1274 CASGEM Procedures for Monitoring Entity Reporting
9 An umbrella Monitoring Entity that coordinates and reports groundwater elevation data collected by multiple agencies within the basin (Scenario C).
Figure 1. Illustration of possible Monitoring Entity scenarios for a monitored basin.
DWR currently monitors water elevations in about 4,000 wells statewide and cooperates with local and federal agencies to monitor roughly an additional 6,000 wells. DWR plans to continue monitoring groundwater elevations, contingent upon available funding. In some basins DWR currently does most, if not all, of the water-elevation monitoring. In these basins, a local entity still needs to notify DWR of their intent to become the Monitoring Entity. The Monitoring Entity must determine which DWR wells will be included in their CASGEM monitoring network. As long as DWR continues its monitoring program, the department will transmit its groundwater elevation data to the CASGEM system. However, if DWR is unable to continue monitoring for any reason, the Monitoring Entity will be required to re-evaluate its monitoring network to determine which wells to retain in its monitoring network.
Scenario B.
One basin, several
Monitoring Entities
collecting and
submitting data
Scenario C.
One basin, one Monitoring
Entity coordinating and
submitting data collected
by several agencies
Scenario A. One Monitoring
Entity collects and reports
data for entire basin
Redlands Regular Meeting of 01-18-2022 Page 475 of 1274 CASGEM Procedures for Monitoring Entity Reporting
10 REQUIREMENTS TO BECOME MONITORING ENTITY
Section 10927 of the Water Code defines the types of entities that may assume responsibility for monitoring and reporting groundwater elevations as part of the CASGEM program.
A summary list of eligible entities, in order of priority, and notification requirements for each entity is provided below:
1. A watermaster or water management engineer appointed by a court or pursuant to statute to administer a final judgment determining rights to groundwater [Section 10927(a)].
Notification Requirements:
Name of Agency
Agency Contact Name
Address
Telephone Number
Email Address
Any other relevant contact information
Authority (as listed in Section 10927)
Name and number of basin to be monitored (from Bulletin 118) Map and shapefile showing area to be monitored (Shapefiles do not need to be submitted by the initial January 1, 2011 notification date; Regional Offices can provide assistance to potential Monitoring Entities with shapefiles.) Statement that the entity will comply with the requirements of Water Code Part 2.11
Additional information deemed necessary by DWR to identify monitoring area or qualifications of the Monitoring Entity
2. A groundwater management agency with statutory authority to manage groundwater pursuant to its principal act that is monitoring groundwater elevations in all or a part of a groundwater basin on or before January 1, 2010 [Section 10927(b)(1)].
Notification Requirements:
Name of Agency
Agency Contact Name
Address
Telephone Number
Email Address
Any other relevant contact information
Authority (as listed in Section 10927)
Redlands Regular Meeting of 01-18-2022 Page 476 of 1274 CASGEM Procedures for Monitoring Entity Reporting
11 Name and number of basin to be monitored (from Bulletin 118) Map and shapefile showing area to be monitored (Shapefiles do not need to be submitted by the initial January 1, 2011 notification date; Regional Offices can provide assistance to potential Monitoring Entities with shapefiles.) Statement that the entity will comply with the requirements of Water Code Part 2.11
Additional information deemed necessary by DWR to identify monitoring area or qualifications of the Monitoring Entity
3. A water replenishment district established pursuant to Water Code Division 18 (commencing with Section 60000). This part does not expand or otherwise affect the authority of a water replenishment district relating to monitoring elevations [Section 10927(b)(2)].
Notification Requirements:
Name of Agency
Agency Contact Name
Address
Telephone Number
Email Address
Any other relevant contact information
Authority (as listed in Section 10927)
Name and number of basin to be monitored (from Bulletin 118) Map and shapefile showing area to be monitored (Shapefiles do not need to be submitted by the initial January 1, 2011 notification date; Regional Offices can provide assistance to potential Monitoring Entities with shapefiles.) Statement that the entity will comply with the requirements of Water Code Part 2.11
Additional information deemed necessary by DWR to identify monitoring area or qualifications of the Monitoring Entity
4. A local agency that is managing all or part of a groundwater basin pursuant to Water Code Part 2.75 (commencing with Section 10750) and that was monitoring groundwater elevations in all or part of a groundwater basin on or before January 1, 2010, or a local agency or county that is managing all or part of a groundwater basin pursuant to any other legally enforceable groundwater management plan with provisions that are substantively similar to those described in that part and that was monitoring groundwater elevations in all or a part of a groundwater basin on or before January 1, 2010 [Section 10927(c)].
Redlands Regular Meeting of 01-18-2022 Page 477 of 1274 CASGEM Procedures for Monitoring Entity Reporting
12 Notification Requirements:
Name of Agency
Agency Contact Name
Address
Telephone Number
Email Address
Any other relevant contact information
Authority (as listed in Section 10927)
Name and number of basin to be monitored (from Bulletin 118) Map and shapefile showing area to be monitored (Shapefiles do not need to be submitted by the initial January 1, 2011 notification date; Regional Offices can provide assistance to potential Monitoring Entities with shapefiles.) Statement that the entity will comply with the requirements of Water Code Part 2.11
Copy of current groundwater management plan
Statement describing the ability or qualifications of the entity to conduct the groundwater monitoring functions required
Additional information deemed necessary by DWR to identify monitoring area or qualifications of the Monitoring Entity
5. A local agency that is managing all or part of a groundwater basin pursuant to an integrated regional water management plan prepared pursuant to Water Code Part 2.2 (commencing with Section 10530) that includes a groundwater management component that complies with the requirements of Section 10753.7 [Section 10927(d)].
Notification Requirements:
Name of Agency
Agency Contact Name
Address
Telephone Number
Email Address
Any other relevant contact information
Authority (as listed in Section 10927)
Name and number of basin to be monitored (from Bulletin 118) Map and shapefile showing area to be monitored (Shapefiles do not need to be submitted by the initial January 1, 2011 notification date; Regional Offices can provide assistance to potential Monitoring Entities with shapefiles.) Statement that the entity will comply with the requirements of Water Code Part 2.11
Copy of current groundwater component of integrated regional water management plan
Statement describing the ability or qualifications of the entity to conduct the groundwater monitoring functions required
Redlands Regular Meeting of 01-18-2022 Page 478 of 1274 CASGEM Procedures for Monitoring Entity Reporting
13 Additional information deemed necessary by DWR to identify monitoring area or qualifications of the Monitoring Entity
6. A county that is not managing all or a part of a groundwater basin pursuant to a legally enforceable groundwater management plan with provisions that are substantively similar to those described in Water Code Part 2.75 (commencing with Section 10750) [Section 10927(e)].
Notification Requirements:
Name of County
County Contact Name
Address
Telephone Number
Email Address
Any other relevant contact information
Authority (as listed in Section 10927)
Name and number of basin to be monitored (from Bulletin 118) Map and shapefile showing area to be monitored (Shapefiles do not need to be submitted by the initial January 1, 2011 notification date; Regional Offices can provide assistance to potential Monitoring Entities with shapefiles.) Statement that the entity will comply with the requirements of Water Code Part 2.11
Statement describing the ability or qualifications of the entity to conduct the groundwater monitoring functions required
Additional information deemed necessary by DWR to identify monitoring area or qualifications of the Monitoring Entity
7. A voluntary cooperative groundwater monitoring association formed pursuant to Section 10935 [Section 10927(f)]. As described in the Water Code Section 10935, the voluntary associations may be established by contract, a joint powers agreement, a memorandum of agreement, or other form of agreement deemed acceptable by DWR, so long as it contains: the names of the participants; the boundaries of the area covered by the agreement; the name or names of the parties responsible for meeting the requirements; the method of recovering the costs associated with meeting the requirements; and other provisions that may be required by DWR. Entities seeking to form a voluntary association should notify DWR, which will work cooperatively with the interested parties to facilitate the formation of the association.
Redlands Regular Meeting of 01-18-2022 Page 479 of 1274 CASGEM Procedures for Monitoring Entity Reporting
14 Notification Requirements:
Name of Association
Association Contact Name
Address
Telephone Number
Email Address
Any other relevant contact information
Authority (as listed in Section 10927)
Name and number of basin to be monitored (from Bulletin 118) Map and shapefile showing area to be monitored (Shapefiles do not need to be submitted by the initial January 1, 2011 notification date; Regional Offices can provide assistance to potential Monitoring Entities with shapefiles.) Statement that the entity will comply with the requirements of Water Code Part 2.11
Statement describing the ability or qualifications of the entity to conduct the groundwater monitoring functions required
Statement of intent to meet the association formation requirements described in Section 10935
Additional information deemed necessary by DWR to identify monitoring area or qualifications of the Monitoring Entity
Local agencies are encouraged to coordinate among themselves to determine the proposed Monitoring Entity or Entities that best suits their area. The resulting interested entity (or entities) should notify DWR of its intent to become a groundwater Monitoring Entity for one or more basins, or portions thereof by the January 1, 2011 deadline.
Certain basic information is required for notification, including contact information and additional details depending on the authority of the entity desiring to monitor groundwater (Section 10928), as listed above. This notification information will be submitted to DWR using an online system that will be available by mid-December 2010.
MONITORING PLANS
Monitoring Entities will each develop a Monitoring Plan that includes the following sections: Monitoring Sites and Timing, Field Methods, and Data Reporting. Monitoring Plans should be completed and submitted to DWR by summer 2011. Staff from the DWR regional offices will be available to assist Monitoring Entities with the development of Monitoring Plans, if needed. In determining what information should be reported to DWR, the department will defer to existing monitoring programs if those programs result in information that demonstrates seasonal (annual high and low groundwater elevations) and long-term trends in groundwater elevations. Staff from the DWR regional offices will assist Monitoring Entities to address any gaps in basin coverage Redlands Regular Meeting of 01-18-2022 Page 480 of 1274 CASGEM Procedures for Monitoring Entity Reporting
15 (see below) and other monitoring issues and may
make recommendations for the location of additional
wells. However, the department has no authority to
require a Monitoring Entity to install additional wells unless funds are provided for that purpose. Once a
Monitoring Plan is established with DWR, Monitoring
Entities should notify DWR of any changes to the
plan.
DATA GAPS
A data gap refers to a basin or portion of a basin that is not included in any of the Monitoring Plans
submitted to DWR. This is essentially an area that
lacks the density of monitoring wells that would allow
seasonal and long-term trends in groundwater
elevations to be determined for the basin, subbasin,
or a portion thereof. Among the 515 basins defined
by Bulletin 118, data gaps may exist for a variety of
reasons, including a lack of suitable monitoring
wells, lack of groundwater use, access issues, and
jurisdictional issues, among others.
If no local entity is able and/or willing to fill a data gap, the department may be required to perform groundwater monitoring functions. If DWR performs this monitoring, local agencies and the county that have the authority under Section 10927 to monitor the area of the data gap would be potentially ineligible for a water grant or loan awarded or administered by the state. The Monitoring Entity or entities with the authority to monitor the area of the data gap should provide detailed information regarding the nature of and reason for the data gap so that DWR may include such information in the prioritization of groundwater basins and subbasins as appropriate.
Agencies and counties that are eligible to be designated Monitoring Entities but choose not participate in the CASGEM program will not lose their state water grant and loan eligibility if their entire service area qualifies as a disadvantaged community (Water Code Section 10933.7(b)). It will be the responsibility of the local agency or county applying for a state water grant or loan to demonstrate their disadvantaged community status at the time they are applying for the grant or loan.
Key Components of
Monitoring Plans
Submit to DWR by summer 2011
Monitoring Sites and Timing
o Well Network Design
o Selected wells (current)
o Planned (future) wells
o Frequency to capture seasonal
highs and lows
o Map and shapefile of
monitoring area and well
locations
Field Methods for groundwater
monitoring
Methods for measuring
o Reference Point
o Static water level
o Depth to water
o Standardized form for data
collection
Data Reporting
Online data submittal, minimum
July & January each year
Redlands Regular Meeting of 01-18-2022 Page 481 of 1274 CASGEM Procedures for Monitoring Entity Reporting
16 MONITORING SITES AND TIMING
The Monitoring Plan will identify the wells to be monitored and the frequency with which they will be monitored. The Monitoring Plan should explain how proposed monitoring will be sufficient to demonstrate the seasonal and long-term groundwater elevation trends in the monitored area. The density of monitoring locations will depend on the complexity of the basin.
Because of security concerns, the California Department of Public Health (DPH) routinely limits the disclosure of detailed public water supply well location information. Pursuant to Water Code Section 10931, the DWR is required to collaborate with DPH to ensure that the information reported to the CASGEM program will not result in the inappropriate disclosure of information of concern to DPH. At this time, DWR has reached no agreement with DPH regarding the appropriate treatment of public water supply well data. As a result, CASGEM does not currently plan to use such well information in its database.
The Monitoring Plan should contain a table identifying the wells to be monitored and the timing of that monitoring. Because the law specifies that information should demonstrate seasonal and long-term trends in groundwater elevations, at a minimum monitoring should be conducted at each location for the yearly high and low for the basin. The yearly high and low groundwater elevations typically occur in spring and fall, but this may vary from basin to basin. It is very important that the timing of all the measurements in the basin is coordinated. Rationale for selection of the timing (seasonal highs and lows) should be included in the Monitoring Plan.
The information on the monitoring sites and timing to be submitted in the online system should include:
Well identification number
State well number
Location (decimal latitude and longitude, North American Datum (NAD) 83) Reference point elevation (feet, North American Vertical Datum (NAVD) 88) Land surface datum (feet, NAVD88)
Map and shapefile with monitoring locations, Bulletin 118 groundwater basin boundary, and boundary of monitoring area
Frequency and timing of measurements
Redlands Regular Meeting of 01-18-2022 Page 482 of 1274 CASGEM Procedures for Monitoring Entity Reporting
17 FIELD METHODS
The consistent and documented collection of groundwater elevation data is important for ensuring that the data can be used across the state, regardless of the Monitoring Entity. The field methods should meet a common set of basic requirements; however, the methods do not have to be exactly the same. Many entities already have in place monitoring efforts that are successful in meeting local needs and that can meet the needs for this program, either as-is or with the incorporation of individual components.
The CASGEM program wishes to maintain, to the greatest extent possible, the procedures of high-quality local groundwater elevation monitoring programs, so long as they meet the overall program goals and policies. Of particular concern are the following basic requirements:
Method(s) to establish the Reference Point, including step-by-step instructions Method(s) to ensure static groundwater elevation
Method(s) to measure depth to water, including step-by-step instructions Method(s) and form(s) for recording measurements
It is the responsibility of each Monitoring Entity to develop and implement monitoring protocols that are appropriate to local groundwater basin conditions, protect the water quality of its monitoring wells, and maintain the quality of the data that it submits to the CASGEM Program. DWR has developed field guidelines (Department of Water Resources Groundwater Elevation Monitoring Guidelines) based on a review of existing field methods from DWR and other organizations, which is available on the CASGEM website. Monitoring Entities are welcome to refer to these guidelines when developing field methods for their own Monitoring Plans. However, the DWR guidelines are for internal use in the event that the Department is required to perform groundwater monitoring functions pursuant to Section 10933.5 and are not binding on any other agency. The core of the CASGEM program will rely and build on the many, established local long-term groundwater monitoring and management programs. The department will defer to existing monitoring programs that result in information that demonstrates seasonal and long-term trends in groundwater elevations.
DATA REPORTING
DWR will develop an online data submittal system for Monitoring Entities to submit their groundwater elevation data. Several methods of submitting data will be available, such as direct online data entry, or upload of data files for batch entry. Initial groundwater elevation data should be submitted to DWR by January 1, 2012. Thereafter, data Redlands Regular Meeting of 01-18-2022 Page 483 of 1274 CASGEM Procedures for Monitoring Entity Reporting
18 should be submitted as soon as possible after collection, but no later than January 1st and July 1st of each year, at the minimum. Historical data can also be submitted via the DWR data system to aid in data interpretation. All submitted data will be available to the public, except for confidential data.
Each groundwater elevation data measurement submitted to the online system should include:
Well identification number
Measurement date
Reference point and land surface elevation
Depth to water
Method of measuring water depth
Measurement quality codes
The Monitoring Entity information, well information, and groundwater elevation information is to be provided by the Monitoring Entity. Items labeled as required must be submitted to DWR to report groundwater elevations. Items labeled as recommended should be submitted to DWR if they are available, as they assist in fully evaluating the quality of measurements. DWR will provide standard form(s) for Monitoring Entities to submit groundwater elevation data online. However, if Monitoring Entities cannot use the standard form(s) or provide the data elements listed below, DWR will work cooperatively with Monitoring Entities to develop alternate methods of submitting data.
Entity Information
All entities assuming groundwater monitoring functions as delineated in Section 10927 (a)-(f) are required to submit the following information:
Monitoring Entity's name, address, telephone number, contact person name and email address, and any other relevant contact information (Section 10928 (a) (1), 10928 (b) (1))
Name, address, telephone number, email address and any other relevant contact information for entities collecting data that is submitted by a designated submitting entity (Monitoring Entity)
Groundwater basins being monitored
o Identify entire basins monitored
o Identify partial basins monitored
Well Information
The following information about each well is required for the CASGEM online system:
Redlands Regular Meeting of 01-18-2022 Page 484 of 1274 CASGEM Procedures for Monitoring Entity Reporting
19 Unique well identification number. Agencies may use an existing State Well Number, an existing local well designation, or develop their own identification name, using the following protocol:
o Agency name, abbreviation, or acronym followed by a sequential number (e.g., SGA 01)
o Groundwater basin – followed by a sequential number (e.g., Llagas 03) o Geographic name – followed by a sequential number (e.g., Yolo 12) o Well names should be 15 characters long or less
o Avoid using owner/business names or specific locational information for privacy and security
Decimal latitude/longitude coordinates of well, using horizontal datum NAD83, and the method of determining coordinates (Actual coordinates are preferred; however, Monitoring Entities may submit approximate locations, as needed, to protect the privacy of well owners. For example, to protect the privacy of a well owner, a Monitoring Entity may submit well coordinate locations that are only within 1000-feet of the actual well location.)
Groundwater basin or sub-basin
Reference point elevation of the well (feet) using NAVD88 vertical datum Elevation of land surface datum at the well (feet) using NAVD88 vertical datum Use of well (e.g., dedicated monitoring, irrigation, domestic, etc) Well completion type (e.g. single well, nested, or multi-completion wells) Depth of screened interval(s) and total well depth of well, if available (feet) Well Completion Report number (DWR Form 188), if available The following information about each well is recommended for the CASGEM online system:
State Well Number – assigned by DWR in most cases
Method by which land surface elevation was determined (for example, topographic map, GPS, etc.)
Written description of location of well, including distance from nearby landmarks and location of reference point in relation to well appurtenances (DWR Form 429) Well information comments
Groundwater Elevation Information
The following information for each groundwater elevation measurement is required for the CASGEM online system:
Well identification number (see Well Information, above) Measurement date
Reference point elevation of the well (feet) using NAVD88 vertical datum Elevation of land surface datum at the well (feet) using NAVD88 vertical datum Depth to water below reference point (feet) (unless no measurement was taken) Method of measuring water depth
Measurement Quality Codes
Redlands Regular Meeting of 01-18-2022 Page 485 of 1274 CASGEM Procedures for Monitoring Entity Reporting
20 o If no measurement is taken, a specified “no measurement” code, must be recorded. Standard codes will be provided by the online system. If a measurement is taken, a “no measurement” code is not recorded.) o If the quality of a measurement is uncertain, a “questionable measurement” code can be recorded. Standard codes will be provided by the online system. If no measurement is taken, a “questionable measurement” code is not recorded.)
Measuring agency identification
The following information for each groundwater elevation measurement is recommended for the CASGEM online system:
Measurement time (PST/PDT with military time/24 hour format) Comments about measurement, if applicable
Groundwater elevation data shall be submitted electronically to DWR’s online system.
DWR will develop electronic data transmittal (EDT) alternatives and data standards to permit bulk data transfer and assist Monitoring Entities in EDT reporting to DWR. As stated above, if Monitoring Entities cannot use the standard form(s) or provide the necessary groundwater elevation data elements, DWR will work cooperatively with Monitoring Entities to develop alternate methods of submitting data.
The CASGEM online data submittal system will be compatible with the Water Data Library (WDL) (http://www.water.ca.gov/waterdatalibrary/), DWR’s existing groundwater elevation database. The CASGEM system will include data reporting options similar to those in WDL, such as hydrographs, seasonal contour data, and data downloads. The combined accessibility of the WDL and the CASGEM system will be a significant resource for local agencies in making sound groundwater management decisions.
Redlands Regular Meeting of 01-18-2022 Page 486 of 1274 CASGEM Procedures for Monitoring Entity Reporting
21 REFERENCES
California Departement of Water Resources. (2003). California's Groundwater, Bulletin 118-03.
California Department of Water Resources. (2009). California Water Plan Update 2009, Bulletin 160-09.
Redlands Regular Meeting of 01-18-2022 Page 487 of 1274 CASGEM Procedures for Monitoring Entity Reporting
22 APPENDIX – SENATE BILL 6 (7TH EXTRAORDINARY SESSION) -
GROUNDWATER MONITORING
Redlands Regular Meeting of 01-18-2022 Page 488 of 1274 CASGEM Procedures for Monitoring Entity Reporting
23 Senate Bill No. 6
CHAPTER 1
An act to add Part 2.11 (commencing with Section 10920) to Division 6 of, and to repeal and add Section 12924 of, the Water Code, relating to groundwater. [Approved by Governor November 6, 2009. Filed with
Secretary of State November 6, 2009.]
Legislative Counsel’s Digest
SB 6, Steinberg. Groundwater.
(1) Existing law authorizes a local agency whose service area includes a groundwater basin that is not subject to groundwater management to adopt and implement a groundwater management plan pursuant to certain provisions of law. Existing law requires a groundwater management plan to include certain components to qualify as a plan for the purposes of those provisions, including a provision that establishes funding requirements for the construction of certain groundwater projects.
This bill would establish a groundwater monitoring program pursuant to which specified entities, in accordance with prescribed procedures, may propose to be designated by the Department of Water Resources as groundwater monitoring entities, as defined, for the purposes of monitoring and reporting with regard to groundwater elevations in all or part of a basin or subbasin, as defined. The bill would require the department to work cooperatively with each monitoring entity to determine the manner in which groundwater elevation information should be reported to the department. The bill would authorize the department to make recommendations for improving an existing monitoring program, and to require additional monitoring wells under certain circumstances. Under certain circumstances, the department would be required to perform groundwater monitoring functions. In that event, prescribed entities with authority to assume groundwater monitoring functions with regard to a basin or subbasin for which the department has assumed those functions would not be eligible for a water grant or loan awarded or administered by the state.
(2) Existing law requires the department to conduct an investigation of the state’s groundwater basins and to report its findings to the Governor and the Legislature not later than January 1, 1980.
Redlands Regular Meeting of 01-18-2022 Page 489 of 1274 CASGEM Procedures for Monitoring Entity Reporting
24 This bill would repeal that provision. The department would be required to conduct an investigation of the state’s groundwater basins and to report its findings to the Governor and the Legislature not later than January 1, 2012, and thereafter in years ending in 5 or
0. (3) The bill would take effect only if SB 1 and SB 7 of the 2009–10 7th Extraordinary Session of the Legislature are enacted and become effective.
The people of the State of California do enact as follows:
SECTION 1. Part 2.11 (commencing with Section 10920) is added to Division 6 of the Water Code, to read:
PART 2.11. GROUNDWATER MONITORING
Chapter 1. General Provisions
10920. (a) It is the intent of the Legislature that on or before January 1, 2012, groundwater elevations in all groundwater basins and subbasins be regularly and systematically monitored locally and that the resulting groundwater information be made readily and widely available.
(b) It is further the intent of the Legislature that the department continue to maintain its current network of monitoring wells, including groundwater elevation and groundwater quality monitoring wells, and that the department continue to coordinate monitoring with local entities.
10921. This part does not require the monitoring of groundwater elevations in an area that is not within a basin or subbasin.
10922. This part does not expand or otherwise affect the powers or duties of the department relating to groundwater beyond those expressly granted by this part.
Chapter 2. Definitions
10925. Unless the context otherwise requires, the definitions set forth in this section govern the construction of this part.
Redlands Regular Meeting of 01-18-2022 Page 490 of 1274 CASGEM Procedures for Monitoring Entity Reporting
25 (a) “Basin” or “subbasin” means a groundwater basin or subbasin identified and defined in the department’s Bulletin No. 118.
(b) “Bulletin No. 118” means the department’s report entitled “California’s Groundwater:
Bulletin 118” updated in 2003, or as it may be subsequently updated or revised in accordance with Section 12924.
(c) “Monitoring entity” means a party conducting or coordinating the monitoring of groundwater elevations pursuant to this part.
(d) “Monitoring functions” and “groundwater monitoring functions” means the monitoring of groundwater elevations, the reporting of those elevations to the department, and other related actions required by this part.
(e) “Monitoring groundwater elevations” means monitoring groundwater elevations, coordinating the monitoring of groundwater elevations, or both. (f) “Voluntary cooperative groundwater monitoring association” means an association formed for the purposes of monitoring groundwater elevations pursuant to Section 10935.
Chapter 3. Groundwater Monitoring Program
10927. Any of the following entities may assume responsibility for monitoring and reporting groundwater elevations in all or a part of a basin or subbasin in accordance with this part:
(a) A watermaster or water management engineer appointed by a court or pursuant to statute to administer a final judgment determining rights to groundwater. (b) (1) A groundwater management agency with statutory authority to manage groundwater pursuant to its principal act that is monitoring groundwater elevations in all or a part of a groundwater basin or subbasin on or before January 1, 2010. (2) A water replenishment district established pursuant to Division 18 (commencing with Section 60000). This part does not expand or otherwise affect the authority of a water replenishment district relating to monitoring groundwater elevations. (c) A local agency that is managing all or part of a groundwater basin or subbasin pursuant to Part 2.75 (commencing with Section 10750) and that was monitoring Redlands Regular Meeting of 01-18-2022 Page 491 of 1274 CASGEM Procedures for Monitoring Entity Reporting
26 groundwater elevations in all or a part of a groundwater basin or subbasin on or before January 1, 2010, or a local agency or county that is managing all or part of a groundwater basin or subbasin pursuant to any other legally enforceable groundwater management plan with provisions that are substantively similar to those described in that part and that was monitoring groundwater elevations in all or a part of a groundwater basin or subbasin on or before January 1, 2010. (d) A local agency that is managing all or part of a groundwater basin or subbasin pursuant to an integrated regional water management plan prepared pursuant to Part
2.2 (commencing with Section 10530) that includes a groundwater management component that complies with the requirements of Section 10753.7. (e) A county that is not managing all or a part of a groundwater basin or subbasin pursuant to a legally enforceable groundwater management plan with provisions that are substantively similar to those described in Part 2.75 (commencing with Section 10750).
(f) A voluntary cooperative groundwater monitoring association formed pursuant to Section 10935.
10928. (a) Any entity described in subdivision (a) or (b) of Section 10927 that seeks to assume groundwater monitoring functions in accordance with this part shall notify the department, in writing, on or before January 1, 2011. The notification shall include all of the following information:
(1) The entity’s name, address, telephone number, and any other relevant contact information.
(2) The specific authority described in Section 10927 pursuant to which the entity qualifies to assume the groundwater monitoring functions. (3) A map showing the area for which the entity is requesting to perform the groundwater monitoring functions.
(4) A statement that the entity will comply with all of the requirements of this part. (b) Any entity described in subdivision (c), (d), (e), or (f) of Section 10927 that seeks to assume groundwater monitoring functions in accordance with this part shall notify the department, in writing, by January 1, 2011. The information provided in the notification shall include all of the following:
Redlands Regular Meeting of 01-18-2022 Page 492 of 1274 CASGEM Procedures for Monitoring Entity Reporting
27 (1) The entity’s name, address, telephone number, and any other relevant contact information.
(2) The specific authority described in Section 10927 pursuant to which the entity qualifies to assume the groundwater monitoring functions. (3) For entities that seek to qualify pursuant to subdivision (c) or (d) of Section 10927, the notification shall also include a copy of the current groundwater management plan or the groundwater component of the integrated regional water management plan, as appropriate.
(4) For entities that seek to qualify pursuant to subdivision (f) of Section 10927, the notification shall include a statement of intention to meet the requirements of Section 10935.
(5) A map showing the area for which the entity is proposing to perform the groundwater monitoring functions.
(6) A statement that the entity will comply with all of the requirements of this part. (7) A statement describing the ability and qualifications of the entity to conduct the groundwater monitoring functions required by this part. (c) The department may request additional information that it deems necessary for the purposes of determining the area that is proposed to be monitored or the qualifications of the entity to perform the groundwater monitoring functions. 10929. (a) (1) The department shall review all notifications received pursuant to Section 10928.
(2) Upon the receipt of a notification pursuant to subdivision (a) of Section 10928, the department shall verify that the notifying entity has the appropriate authority under subdivision (a) or (b) of Section 10927.
(3) Upon the receipt of a notification pursuant to subdivision (b) of Section 10928, the department shall do both of the following:
(A) Verify that each notification is complete.
(B) Assess the qualifications of the notifying party.
Redlands Regular Meeting of 01-18-2022 Page 493 of 1274 CASGEM Procedures for Monitoring Entity Reporting
28 (b) If the department has questions about the completeness or accuracy of a notification, or the qualifications of a party, the department shall contact the party to resolve any deficiencies. If the department is unable to resolve the deficiencies, the department shall notify the party in writing that the notification will not be considered further until the deficiencies are corrected.
(c) If the department determines that more than one party seeks to become the monitoring entity for the same portion of a basin or subbasin, the department shall consult with the interested parties to determine which party will perform the monitoring functions. In determining which party will perform the monitoring functions under this part, the department shall follow the order in which entities are identified in Section 10927.
(d) The department shall advise each party on the status of its notification within three months of receiving the notification.
10930. Upon completion of each review pursuant to Section 10929, the department shall do both of the following if it determines that a party will perform monitoring functions under this part:
(a) Notify the party in writing that it is a monitoring entity and the specific portion of the basin or subbasin for which it shall assume groundwater monitoring functions. (b) Post on the department’s Internet Web site information that identifies the monitoring entity and the portion of the basin or subbasin for which the monitoring entity will be responsible.
10931. (a) The department shall work cooperatively with each monitoring entity to determine the manner in which groundwater elevation information should be reported to the department pursuant to this part. In determining what information should be reported to the department, the department shall defer to existing monitoring programs if those programs result in information that demonstrates seasonal and long-term trends in groundwater elevations. The department shall collaborate with the State Department of Public Health to ensure that the information reported to the department will not result in the inappropriate disclosure of the physical address or geographical location of drinking water sources, storage facilities, pumping operational data, or treatment facilities.
Redlands Regular Meeting of 01-18-2022 Page 494 of 1274 CASGEM Procedures for Monitoring Entity Reporting
29 (b) (1) For the purposes of this part, the department may recommend improvements to an existing monitoring program, including recommendations for additional monitoring wells.
(2) The department may not require additional monitoring wells unless funds are provided for that purpose.
10932. Monitoring entities shall commence monitoring and reporting groundwater elevations pursuant to this part on or before January 1, 2012. 10933. (a) On or before January 1, 2012, the department shall commence to identify the extent of monitoring of groundwater elevations that is being undertaken within each basin and subbasin.
(b) The department shall prioritize groundwater basins and subbasins for the purpose of implementing this section. In prioritizing the basins and subbasins, the department shall, to the extent data are available, consider all of the following:
(1) The population overlying the basin or subbasin.
(2) The rate of current and projected growth of the population overlying the basin or subbasin.
(3) The number of public supply wells that draw from the basin or subbasin. (4) The total number of wells that draw from the basin or subbasin. (5) The irrigated acreage overlying the basin or subbasin. (6) The degree to which persons overlying the basin or subbasin rely on groundwater as their primary source of water.
(7) Any documented impacts on the groundwater within the basin or subbasin, including overdraft, subsidence, saline intrusion, and other water quality degradation. (8) Any other information determined to be relevant by the department. (c) If the department determines that all or part of a basin or subbasin is not being monitored pursuant to this part, the department shall do all of the following:
Redlands Regular Meeting of 01-18-2022 Page 495 of 1274 CASGEM Procedures for Monitoring Entity Reporting
30 (1) Attempt to contact all well owners within the area not being monitored. (2) Determine if there is an interest in establishing any of the following:
(A) A groundwater management plan pursuant to Part 2.75 (commencing with Section 10750).
(B) An integrated regional water management plan pursuant to Part 2.2 (commencing with Section 10530) that includes a groundwater management component that complies with the requirements of Section 10753.7.
(C) A voluntary groundwater monitoring association pursuant to Section 10935. (d) If the department determines that there is sufficient interest in establishing a plan or association described in paragraph (2) of subdivision (c), or if the county agrees to perform the groundwater monitoring functions in accordance with this part, the department shall work cooperatively with the interested parties to comply with the requirements of this part within two years.
(e) If the department determines, with regard to a basin or subbasin, that there is insufficient interest in establishing a plan or association described in paragraph (2) of subdivision (c), and if the county decides not to perform the groundwater monitoring and reporting functions of this part, the department shall do all of the following:
(1) Identify any existing monitoring wells that overlie the basin or subbasin that are owned or operated by the department or any other state or federal agency. (2) Determine whether the monitoring wells identified pursuant to paragraph (1) provide sufficient information to demonstrate seasonal and long-term trends in groundwater elevations.
(3) If the department determines that the monitoring wells identified pursuant to paragraph (1) provide sufficient information to demonstrate seasonal and long-term trends in groundwater elevations, the department shall not perform groundwater monitoring functions pursuant to Section 10934.
(4) If the department determines that the monitoring wells identified pursuant to paragraph (1) provide insufficient information to demonstrate seasonal and long-term trends in groundwater elevations, and the State Mining and Geology Board concurs with Redlands Regular Meeting of 01-18-2022 Page 496 of 1274 CASGEM Procedures for Monitoring Entity Reporting
31 that determination, the department shall perform groundwater monitoring functions pursuant to Section 10934.1
10933.5. (a) Consistent with Section 10933, the department shall perform the groundwater monitoring functions for those portions of a basin or subbasin for which no monitoring entity has agreed to perform the groundwater monitoring functions. (b) Upon determining that it is required to perform groundwater monitoring functions, the department shall notify both of the following entities that it is forming the groundwater monitoring district:
(1) Each well owner within the affected area.
(2) Each county that contains all or a part of the affected area. (c) The department shall not assess a fee or charge to recover the costs for carrying out its power and duties under this part.
(d) The department may establish regulations to implement this section. 10933.7. (a) If the department is required to perform groundwater monitoring functions pursuant to Section 10933.5, the county and the entities described in subdivisions (a) to (d), inclusive, of Section 10927 shall not be eligible for a water grant or loan awarded or administered by the state.
(b) Notwithstanding subdivision (a), the department shall determine that an entity described in subdivision (a) is eligible for a water grant or loan under the circumstances described in subdivision (a) if the entity has submitted to the department for approval documentation demonstrating that its entire service area qualifies as a disadvantaged community.
10934. (a) For purposes of this part, neither any entity described in Section 10927, nor the department, shall have the authority to do either of the following:
(1) To enter private property without the consent of the property owner.
1 The reference in Section 10933(e)(4) to Section 10934 has been amended by Stats. 2010, Ch. 328, sec. 237 (S.B. 1330). The new reference will be to Section 10933.5.
Redlands Regular Meeting of 01-18-2022 Page 497 of 1274 CASGEM Procedures for Monitoring Entity Reporting
32 (2) To require a private property owner to submit groundwater monitoring information to the entity.
(b) This section does not apply to a county or an entity described in subdivisions (a) to (d), inclusive, of Section 10927 that assumed responsibility for monitoring and reporting groundwater elevations prior to the effective date of this part. 10935. (a) A voluntary cooperative groundwater monitoring association may be formed for the purposes of monitoring groundwater elevations in accordance with this part. The association may be established by contract, a joint powers agreement, a memorandum of agreement, or other form of agreement deemed acceptable by the department. (b) Upon notification to the department by one or more entities that seek to form a voluntary cooperative groundwater monitoring association, the department shall work cooperatively with the interested parties to facilitate the formation of the association. (c) The contract or agreement shall include all of the following:
(1) The names of the participants.
(2) The boundaries of the area covered by the agreement. (3) The name or names of the parties responsible for meeting the requirements of this part.
(4) The method of recovering the costs associated with meeting the requirements of this part.
(5) Other provisions that may be required by the department. 10936. Costs incurred by the department pursuant to this chapter may be funded from unallocated bond revenues pursuant to paragraph (12) of subdivision (a) of Section 75027 of the Public Resources Code, to the extent those funds are available for those purposes.
SEC. 2. Section 12924 of the Water Code is repealed.
SEC. 3. Section 12924 is added to the Water Code, to read:
Redlands Regular Meeting of 01-18-2022 Page 498 of 1274 CASGEM Procedures for Monitoring Entity Reporting
33 12924. (a) The department, in conjunction with other public agencies, shall conduct an investigation of the state’s groundwater basins. The department shall identify the state’s groundwater basins on the basis of geological and hydrological conditions and consideration of political boundary lines whenever practical. The department shall also investigate existing general patterns of groundwater pumping and groundwater recharge within those basins to the extent necessary to identify basins that are subject to critical conditions of overdraft.
(b) The department shall report its findings to the Governor and the Legislature not later than January 1, 2012, and thereafter in years ending in 5 or 0.
SEC. 4. This act shall take effect only if Senate Bill 1 and Senate Bill 7 of the 2009–10 Seventh Extraordinary Session of the Legislature are enacted and become effective.
Redlands Regular Meeting of 01-18-2022 Page 499 of 1274 Redlands Regular Meeting of 01-18-2022 Page 500 of 1274 Redlands Regular Meeting of 01-18-2022 Page 501 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-74 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 502 of 1274 Redlands Regular Meeting of 01-18-2022 Page 503 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-76 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 504 of 1274 Redlands Regular Meeting of 01-18-2022 Page 505 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-78 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 506 of 1274 Redlands Regular Meeting of 01-18-2022 Page 507 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-80 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 508 of 1274 Redlands Regular Meeting of 01-18-2022 Page 509 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-82 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 510 of 1274 Redlands Regular Meeting of 01-18-2022 Page 511 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-84 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 512 of 1274 Redlands Regular Meeting of 01-18-2022 Page 513 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-86 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 514 of 1274 Redlands Regular Meeting of 01-18-2022 Page 515 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-88 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 516 of 1274 Redlands Regular Meeting of 01-18-2022 Page 517 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-90 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 518 of 1274 Redlands Regular Meeting of 01-18-2022 Page 519 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-92 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 520 of 1274 Redlands Regular Meeting of 01-18-2022 Page 521 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-94 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 522 of 1274 Redlands Regular Meeting of 01-18-2022 Page 523 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-96 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 524 of 1274 Redlands Regular Meeting of 01-18-2022 Page 525 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-98 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 526 of 1274 Redlands Regular Meeting of 01-18-2022 Page 527 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-100 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 528 of 1274 Redlands Regular Meeting of 01-18-2022 Page 529 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-102 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 530 of 1274 Redlands Regular Meeting of 01-18-2022 Page 531 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-104 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 532 of 1274 Redlands Regular Meeting of 01-18-2022 Page 533 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-106 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 534 of 1274 Redlands Regular Meeting of 01-18-2022 Page 535 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-108 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 536 of 1274 Redlands Regular Meeting of 01-18-2022 Page 537 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-110 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 538 of 1274 Redlands Regular Meeting of 01-18-2022 Page 539 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-112 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 540 of 1274 Redlands Regular Meeting of 01-18-2022 Page 541 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-114 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 542 of 1274 Redlands Regular Meeting of 01-18-2022 Page 543 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-116 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 544 of 1274 Redlands Regular Meeting of 01-18-2022 Page 545 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-118 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 546 of 1274 Redlands Regular Meeting of 01-18-2022 Page 547 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-120 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 548 of 1274 Redlands Regular Meeting of 01-18-2022 Page 549 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-122 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 550 of 1274 Redlands Regular Meeting of 01-18-2022 Page 551 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-124 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 552 of 1274 Redlands Regular Meeting of 01-18-2022 Page 553 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-126 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 554 of 1274 Redlands Regular Meeting of 01-18-2022 Page 555 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-128 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 556 of 1274 Redlands Regular Meeting of 01-18-2022 Page 557 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-130 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 558 of 1274 Redlands Regular Meeting of 01-18-2022 Page 559 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-132 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 560 of 1274 Redlands Regular Meeting of 01-18-2022 Page 561 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-134 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 562 of 1274 Redlands Regular Meeting of 01-18-2022 Page 563 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-136 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 564 of 1274 Redlands Regular Meeting of 01-18-2022 Page 565 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-138 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 566 of 1274 Redlands Regular Meeting of 01-18-2022 Page 567 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-140 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 568 of 1274 Redlands Regular Meeting of 01-18-2022 Page 569 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-142 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 570 of 1274 Redlands Regular Meeting of 01-18-2022 Page 571 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-144 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 572 of 1274 Redlands Regular Meeting of 01-18-2022 Page 573 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-146 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 574 of 1274 Redlands Regular Meeting of 01-18-2022 Page 575 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-148 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 576 of 1274 Redlands Regular Meeting of 01-18-2022 Page 577 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-150 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 578 of 1274 Redlands Regular Meeting of 01-18-2022 Page 579 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-152 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 580 of 1274 Redlands Regular Meeting of 01-18-2022 Page 581 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-154 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 582 of 1274 Redlands Regular Meeting of 01-18-2022 Page 583 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-156 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 584 of 1274 !<
!<
!<
!<
!H
!H
!H
!H
!H !H
!H
!H
!H
!H
!H
!H
!H !H !H
!H
!H
!H
!H
!H
!H
!H
!H
!H !H
!H !H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
GF
GF
GF
GF
GF
GF
GF
GF
GF GF
GFGF
GF
GF
GF GF
#*
Chlorinator
GWMW-1
GWMW-2
GWMW-3
GWMW-5
USGS 6th St
USGS Dunlap
USGS
Equestrian Park
USGS Wilson Creek Y-13
Y-21
Y-22 YRP-EX2 (YRP-PZ2)
YRP-PZ3
YVWD-27A
YRP-EX1 (YRP-PZ1)
South Mesa 01
South Mesa 04
South Mesa 05
South Mesa 07
South Mesa 09 South Mesa 11
South Mesa 12
South Mesa 16
South Mesa 17
WHWC-06
WHWC-09
WHWC-10
WHWC-11
WHWC-12 WHWC-14
WHWC-2/
WHWC-02A
YVWD-02
YVWD-05
YVWD-06
YVWD-07
YVWD-09
YVWD-10
YVWD-12
YVWD-13
YVWD-14
YVWD-18 YVWD-16
YVWD-24 YVWD-27
YVWD-37
YVWD-43
YVWD-44
YVWD-46
YVWD-48
YVWD-49
YVWD-53
YVWD-55
YVWD-56
YVWD-61
YVWD-25
Chicken Hill
GL-8
Knight
Hog Canyon 2
Yucaipa Subbasin Groundwater Monitoring Network
Yucaipa Subbasin Groundwater Sustainability Plan
SOURCE: SBVMWD, YVWD, WHWC, SMWC, City of Redlands, USGS 0 10.5
Miles
Legend
B118 Yucaipa Subbasin (8-
002.07)
Hydrogeologic Subareas
Management Area
Calimesa
North Bench
San Timoteo
Western Heights
Well Owner
") South Mountain
") County of San Bernardino
") South Mesa
") SBVMWD
") USGS
") WHWC
") YVWD
") Private Owner
Current Well Use
< Irrigation
F Monitoring
H Municipal Water Supply
¸¸ Surface Water Diversion
FIGURE 3-5
Redlands Regular Meeting of 01-18-2022 Page 585 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-158 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 586 of 1274 !<
!<
!<
!<
!H
!H
!H
!H !H
!H
!H
!H
!H
!H
!H
!H !H !H
!H
!H
!H
!H
!H
!H
!H
!H
!H !H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
GF
GF
GF
GF
GF
GF
GF
GF
GF GF
GFGF
GF
GF
GF GF
#*
Chlorinator
GWMW-1
GWMW-2
GWMW-3
GWMW-5
USGS 6th St
USGS Dunlap
USGS
Equestrian Park
USGS Wilson Creek Y-13
Y-21
Y-22 YRP-EX2 (YRP-PZ2)
YRP-PZ3
YVWD-27A
YRP-EX1 (YRP-PZ1)
South Mesa 01
South Mesa 05
South Mesa 07
South Mesa 09 South Mesa 11
South Mesa 12
South Mesa 16
South Mesa 17
WHWC-06
WHWC-09
WHWC-10
WHWC-11
WHWC-12 WHWC-14
WHWC-2/
WHWC-02A
YVWD-02
YVWD-05
YVWD-06
YVWD-07
YVWD-09
YVWD-10
YVWD-12
YVWD-13
YVWD-14
YVWD-18
YVWD-24 YVWD-27
YVWD-37
YVWD-43
YVWD-44
YVWD-46
YVWD-49
YVWD-53
YVWD-55
YVWD-56
YVWD-25
Chicken Hill
GL-8
Knight
Hog Canyon 2
Monitoring Network Wells Designated to Measure Groundwater Elevations Yucaipa Subbasin Groundwater Sustainability Plan
SOURCE: SBVMWD, YVWD, WHWC, SMWC, City of Redlands, USGS 0 10.5
Miles
Legend
B118 Yucaipa Subbasin (8-
002.07)
Hydrogeologic Subareas
Management Area
Calimesa
North Bench
San Timoteo
Western Heights
Well Owner
") South Mountain
") County of San Bernardino
") South Mesa
") SBVMWD
") USGS
") WHWC
") YVWD
") Private Owner
Current Well Use
< Irrigation
F Monitoring
H Municipal Water Supply
¸¸ Surface Water Diversion
FIGURE 3-
Redlands Regular Meeting of 01-18-2022 Page 587 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-160 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 588 of 1274 !<
!<
!<
!<
!H
!H
!H
!H !H
!H
!H
!H
!H
!H !H !H
!H
!H
!H
!H
!H !H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
#*
South Mesa 04
South Mesa 05
South Mesa 07
South Mesa 09 South Mesa 11
South Mesa 12
South Mesa 16
South Mesa 17
WHWC-10
WHWC-11
WHWC-12
WHWC-14
WHWC-2/
WHWC-02A
YVWD-02
YVWD-10
YVWD-12
YVWD-14
YVWD-18 YVWD-16
YVWD-24 YVWD-27
YVWD-37
YVWD-44
YVWD-46
YVWD-48
YVWD-53
YVWD-55
YVWD-56
YVWD-61
YVWD-25
Chicken Hill
GL-8
Knight
Hog Canyon 2
Monitoring Network Wells Designated to Measure Groundwater Production Yucaipa Subbasin Groundwater Sustainability Plan
SOURCE: SBVMWD, YVWD, WHWC, SMWC, City of Redlands, USGS 0 10.5
Miles
Legend
B118 Yucaipa Subbasin (8-
002.07)
Hydrogeologic Subareas
Management Area
Calimesa
North Bench
San Timoteo
Western Heights
Well Owner
") South Mountain
") County of San Bernardino
") South Mesa
") SBVMWD
") USGS
") WHWC
") YVWD
") Private Owner
Current Well Use
< Irrigation
F Monitoring
H Municipal Water Supply
¸¸ Surface Water Diversion
FIGURE 3-5
Redlands Regular Meeting of 01-18-2022 Page 589 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-162 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 590 of 1274 !<
!<
!<
!<
!H
!H
!H !H
!H
!H
!H
!H
!H !H !H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
GF
GF
GF
GF
GF
GFGF
GF
GF
GF
#*
GWMW-1
GWMW-2
GWMW-3
GWMW-5
Y-13
Y-21
Y-22 YRP-EX2 (YRP-PZ2)
YRP-PZ3
YRP-EX1 (YRP-PZ1)
South Mesa 05
South Mesa 07
South Mesa 09 South Mesa 11
South Mesa 12
South Mesa 16
South Mesa 17
WHWC-10
WHWC-11
WHWC-12
WHWC-14
WHWC-2/
WHWC-02A
YVWD-02
YVWD-12
YVWD-14
YVWD-18
YVWD-24 YVWD-27
YVWD-37
YVWD-44
YVWD-46
YVWD-53
YVWD-55
YVWD-56
YVWD-25
Chicken Hill
GL-8
Knight
Hog Canyon 2
Monitoring Network Wells Designated to Measure Groundwater Quality Yucaipa Subbasin Groundwater Sustainability Plan
SOURCE: SBVMWD, YVWD, WHWC, SMWC, City of Redlands, USGS 0 10.5
Miles
Legend
B118 Yucaipa Subbasin (8-
002.07)
Hydrogeologic Subareas
Management Area
Calimesa
North Bench
San Timoteo
Western Heights
Well Owner
") South Mountain
") County of San Bernardino
") South Mesa
") SBVMWD
") USGS
") WHWC
") YVWD
") Private Owner
Current Well Use
< Irrigation
F Monitoring
H Municipal Water Supply
¸¸ Surface Water Diversion
FIGURE 3-55
Redlands Regular Meeting of 01-18-2022 Page 591 of 1274
ADMINISTRATIVE DRAFT GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 3 – SUSTAINABLE MANAGEMENT CRITERIA
11507
3-164 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 592 of 1274 11507
4-1 October 2021
4 Projects and Management Actions
4.1 Introduction to Projects and Management Actions
Sub article 5 of Article 5 of the California Code of Regulations (CCR) Division 2 Chapter 1.5 (23 CCR, Section 354.42–354.44) describes the criteria for projects and management actions to be included in a Groundwater Sustainability Plan (GSP) that will help achieve the sustainability goal established for the Plan Area over the planning and implementation horizon. Currently, the Yucaipa Subbasin is being managed sustainably. The importation of State Water Project (SWP) water as a supplemental source of water has allowed the water purveyors to reduce groundwater production in the Subbasin to below the estimated sustainable yield. Consequently, groundwater levels have recovered 50 to 200 feet in the past 10 years with groundwater storage increasing by approximately 18,000 AF (Section 2.8).
Future projections with groundwater production constrained to the estimated sustainable yield of 10,980 AFY, which is higher than the average annual extraction of 9,100 AFY observed from the 2014 WY to the-2018 WY period, indicate that the Yucaipa Subbasin will not experience undesirable results over the 50-year planning and implementation period. The simulated Future Baseline with Climate Change II scenario using the YIHM indicated that conditions in the Calimesa Management Area may decline below the measurable objective and trend toward the minimum threshold (Figure 3-35). Under such conditions that may be experienced in the Calimesa management area and throughout the Subbasin, the Yucaipa GSA has defined management actions that will be implemented to prevent undesirable results.
The management actions included in this Chapter document the actions that the Yucaipa GSA will implement in the event that groundwater elevations in one or more management areas decline below their respective measurable objectives and minimum thresholds. The management actions are not currently necessary to achieve sustainability in the Plan Area, which has experienced rising groundwater levels and increased groundwater in storage since 2008 (Section 2.7). However, the following management actions will be implemented, as necessary, to respond to declining conditions that deviate from the future predictions by the YIHM.
Currently, no projects have been identified as necessary to achieve groundwater sustainability in the Plan Area.
Member agencies of the Yucaipa GSA have constructed spreading basins and stormwater capture basins, and are in the process of designing and constructing new ones, to enhance recharge to the Subbasin. The Wilson Creek and Oak Glen Creek spreading basins were designed to receive SWP water from the East Branch Extension and to capture major stormwater flows.
4.2 Management Actions
Minimum thresholds and measurable objectives were defined for the four management areas in the Plan Area. For the North Bench, Calimesa and Western Heights management areas, minimum thresholds were defined at either the historical low in groundwater elevations in the North Bench Management Area, or below historical lows in the Calimesa and Western Heights management areas. The minimum threshold and measurable objective for the San Timoteo management area were defined to prevent significant and unreasonable effects on groundwaterdependent ecosystems (GDEs) identified along San Timoteo Creek. A drought buffer was defined for the North Bench, Calimesa and Western Heights management areas to provide operational flexibility between their respective measurable objectives and minimum thresholds.
Redlands Regular Meeting of 01-18-2022 Page 593 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-2 October 2021
4.2.1 Management Action No. 1 – Reduce Net Use of Groundwater When Groundwater Levels Decline below Measurable Objectives The drought buffers established for the North Bench, Calimesa and Western Heights management areas provide operational flexibility to implement management actions when groundwater conditions decline below their respective measurable objectives (Section 3.4). The following management actions for these three management areas will prevent undesirable results related to the chronic lowering of groundwater levels, reduction in groundwater storage, and land subsidence. The management action implemented when groundwater levels decline below the measurable objective for the San Timoteo management area will prevent significant and unreasonable effects resulting in a loss in surface water interconnected with shallow groundwater that sustain GDEs.
4.2.1.1 North Bench Management Area
The North Bench management area includes eight RMPs each associated with a groundwater elevation representing the measurable objective at 230,000 AF in storage and the minimum threshold at 220,000 AF in storage (Table 3-3). Currently, groundwater levels are 50 feet to 130 feet above the measurable objective levels designated at the RMPs (Table 4-1).
Table 4-1. Groundwater Elevations Pertaining to Management Actions for the North Bench Management Area
Representative
Monitoring Point
Current Groundwater
Elevations (feet NAVD88)
Groundwater Elevations
at the Minimum
Threshold (feet NAVD88)
Groundwater Elevations
at the Measurable
Objective (feet NAVD88)
YVWD-06 2,359.99 2,255.47 2,276.91
YVWD-07 2,435.42 2,239.38 2,318.07
YVWD-37 2,585.64 2,503.91 2,527.68
YVWD-46 2,357.42 2,209.32 2,228.73
YVWD-53 2,446.53 2,315.55 2,337.17
YVWD-56 2,426.23 2,269.24 2,291.03
USGS Wilson Creek #1
(820'-840')
2,455.55 2,300.24 2,329.25
USGS Wilson Creek #4
(350'-370')
2,482.04 2,317.09 2,349.27
Average 2,443.60 2,301.27 2,332.26
Redlands Regular Meeting of 01-18-2022 Page 594 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-3 October 2021
The YIHM predicts that future groundwater elevations with groundwater production constrained to the estimated sustainable yield of 3,940 AFY will remain above the measurable objective levels associated with each RMP (Figures 3-7 to 3-14). However, the following conditions will trigger management actions to be implemented by the Yucaipa GSA:
1) If groundwater elevations decline below the measurable objective levels at 50% or more of the RMPs (Table 4-1) for 2 consecutive years, then the following management action will be implemented:
a) The net use of groundwater from the North Bench management area will decrease by 25% of the estimated sustainable yield of 3,940 AFY, or by 990 AFY. The Yucaipa GSA will implement this management action by either reducing groundwater production by 990 AFY, artificially recharging the aquifer with an additional 990 AFY of supplemental water, enacting water conservation programs or other programs that result in a net reduction of groundwater use by 990 AFY, or any combination of these actions that result in a net reduction of groundwater use by 990 AFY. Because the management area is not experiencing or is expected to experience conditions below the measurable objective through the 50-year planning and implementation horizon, no interim milestones are defined in this GSP. However, if conditions do develop and this management action is implemented, then the Yucaipa GSA will identify interim milestones at that time to evaluate progress in achieving groundwater sustainability. b) The 25% net reduction in groundwater use, which may be achieved with a reduction in groundwater production from 3,940 AFY to 2,950 AFY, was selected because historical data indicated that, when groundwater production was at 3,000 AFY or less, groundwater levels and the volume in storage were stable or increased during periods of “below normal” to “wet” water year types (Figures 2-3, 3-3, and 3- 6). The Yucaipa GSA, at its discretion, may modify the 25% reduction (e.g., implement a higher percentage of reduction) if this rate is not sufficient to improve conditions in the management area and avoid undesirable results.
c) Implementing this management action will also require the Yucaipa GSA to reevaluate and, possibly, recalibrate the YIHM to improve the accuracy of the model in predicting future conditions. This action will be implemented if the occurrence is outside the scheduled 5-year evaluation, which already includes a reevaluation of the YIHM.
2) If conditions continue to decline and groundwater elevations at 50% or more of the RMPs fall below their respective minimum threshold levels (Table 4-1) for 2 consecutive years, then the following management action will be implemented:
a) The net use of groundwater from the North Bench management area will decrease by 35% of the estimated sustainable yield of 3,940 AFY, or by 1,380 AFY. The Yucaipa GSA will achieve this management action by either reducing groundwater production by 1,380 AFY, artificially recharge the aquifer with an additional 1,390 AFY of supplemental water, enact water conservation programs or other programs that result in a net reduction of groundwater withdrawal by 1,380 AFY, or any combination of these actions that result in a net reduction of groundwater withdrawal by 1,380 AFY. Because the management area is not experiencing or is expected to experience conditions below the minimum threshold through the 50-year planning and implementation horizon, no interim milestones are defined in this GSP. However, if conditions do fall below the minimum threshold and this management action is implemented, then the Yucaipa GSA will identify interim milestones at that time to evaluate progress in improving conditions to achieve groundwater sustainability. b) The 35% net reduction in groundwater use, which may represent a reduction in groundwater production to 2,560 AFY, was selected because historical data indicated that, when groundwater production was at 2,600 AFY or less, groundwater levels and the volume in storage were stable or increased during periods Redlands Regular Meeting of 01-18-2022 Page 595 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-4 October 2021
of “dry” to “wet” water year types (Figures 2-3, 3-3, and 3-6). The Yucaipa GSA, at its discretion, may modify the 35% reduction (e.g., implement a higher percentage of reduction) if this rate is not sufficient to improve conditions in the management area.
4.2.1.1.1 Measurable Objective Expected to Benefit
The measurable objective established for the sustainability indicators of chronic lowering of groundwater levels, reduction in groundwater storage, and land subsidence would benefit from the implementation of this management action. The goal of the management action is to reduce the net use of groundwater from the management area by 25% to 35% of the estimated sustainable yield until conditions improve to the measurable objective where the management area is managed sustainably.
4.2.1.1.2 Expected Benefits and Evaluation
The sustainability criteria established for the North Bench management area were designed to protect the long-term groundwater supply and maintain production for the existing wells operated by YVWD and private users. The establishment of a drought buffer, represented by a range in the volume in storage from 220,000 to 230,000 AF, provides operational flexibility for the Yucaipa GSA to implement these management actions to avoid or improve conditions from undesirable results. These actions allow the management area to recover during “dry“ to “wet” water year types when recharge, either naturally or artificially, or both, will exceed the net withdrawal of groundwater.
Groundwater in storage will increase and chronic declines in groundwater elevation will cease or reverse with a net reduction in groundwater withdrawal from the management area. Groundwater in storage will be measured using groundwater elevations as a proxy. If groundwater elevations stabilize, or rise at the groundwater level RMPs, the management action will have succeeded in increasing the volume of groundwater in storage and prevented the chronic decline in groundwater levels. Conditions at the measurable objective or higher are at or above the historical low, which will negate the undesirable result of land subsidence potentially occurring due to a long-term groundwater level decline below the historical low.
4.2.1.1.3 Circumstances for Implementation
This management action would be implemented under the following circumstances:
1. When groundwater levels measured at 50% or more of the RMPs fall below their respective measurable objective levels for 2 consecutive years, or
2. When groundwater levels measured at 50% or more of the RMPs fall below their respective minimum threshold levels for 2 consecutive years.
4.2.1.1.4 Public Noticing
Public noticing is not required for this management action, which would be undertaken under the Yucaipa GSA’s authority to control groundwater withdrawals from the Plan Area, including the North Bench management area. The Yucaipa GSA will notify private well owners that will be affected by the implementation of this management action if it requires a reduction in their respective groundwater production.
Redlands Regular Meeting of 01-18-2022 Page 596 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-5 October 2021
4.2.1.1.5 Permitting and Regulatory Process
No additional permitting or regulatory oversight is necessary to implement this management action, which would be undertaken under the Yucaipa GSA’s authority per Water Code, Section 10726.4.
4.2.1.1.6 Implementation Schedule
There is no specific implementation schedule for this management action as projected groundwater levels indicate this management action will not be required. The Yucaipa GSA will implement this management action within six months of determining that one of the criteria for implementation described in Section 4.2.1.1.3 has been met.
4.2.1.1.7 Legal Authority
The Yucaipa GSA has the legal authority to operate and regulate the production from water supply wells in the Plan Area per Water Code, Section 10726.4; and to import surface water (e.g., SWP water) or other supplemental water to artificially recharge the Subbasin per Water Code, Section 10726.2. No additional legal authority is required.
4.2.1.1.8 Estimated Costs
The costs associated with the implementation of this management action have not yet been estimated. However, if this management action is implemented and groundwater production is decreased, then additional costs may be incurred by YVWD (the only water purveyor operating in the North Bench management area), or its respective customers, to supply additional supplemental water, enact water conservation programs, or other actions to meet water demands.
4.2.1.2 Calimesa Management Area
The Calimesa management area includes 13 RMPs; each is associated with groundwater elevations representing the measurable objective at 798,700 AF and the minimum threshold at 772,700 AF in storage (Table 3-4; Table 4-2). The measurable objective is represented by the historical low condition and indicates that no undesirable results are occurring in the management area.
Table 4-2. Groundwater Elevations Pertaining to Management Actions for the Calimesa Management Area
Representative
Monitoring
Point
Current
Groundwater
Elevations
(feet NAVD88)
Groundwater
Elevations at the
Measurable
Objective (Tier 1
in the Drought
Buffer)
(feet NAVD88)
Groundwater
Elevations at
Tier 2 in the
Drought Buffer
(feet NAVD88)
Groundwater
Elevations at
Tier 3 in the
Drought Buffer
(feet NAVD88)
Estimated
Measured
Groundwater
Elevations at the
Minimum
Threshold
(feet NAVD88)
Hog Canyon 2 2,090.13 2,083.77 2,063.66 2,040.10 2,021.82 South Mesa 07 2,062.73 2,044.08 2,022.66 2,000.74 1,982.14 South Mesa 09 2,068.70 2,024.19 1,993.77 1,972.09 1,958.58 South Mesa 12 2,095.74 2,080.33 2,059.58 2,036.88 2,018.27 South Mesa 17 2,092.77 2,068.72 2,048.20 2,024.96 2,006.30 Redlands Regular Meeting of 01-18-2022 Page 597 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-6 October 2021
Table 4-2. Groundwater Elevations Pertaining to Management Actions for the Calimesa Management Area
Representative
Monitoring
Point
Current
Groundwater
Elevations
(feet NAVD88)
Groundwater
Elevations at the
Measurable
Objective (Tier 1
in the Drought
Buffer)
(feet NAVD88)
Groundwater
Elevations at
Tier 2 in the
Drought Buffer
(feet NAVD88)
Groundwater
Elevations at
Tier 3 in the
Drought Buffer
(feet NAVD88)
Estimated
Measured
Groundwater
Elevations at the
Minimum
Threshold
(feet NAVD88)
USGS 6th St
#1 (870 feet
to-930 feet')
2,133.89 2,121.89 2,101.45 2,078.07 2,058.61
USGS 6th
Street #4 (380
feet to-400
feet)
2,170.93 2,175.05 2,165.66 2,146.93 2,127.70
USGS
Equestrian
Park #1 (830'-
850')
2,203.28 2,203.61 2,197.82 2,186.96 2,173.37
USGS
Equestrian
Park #4 (380'-
400')
2,206.59 2,207.39 2,201.74 2,190.86 2,176.87
YVWD-10 2,087.74 2,076.79 2,056.62 2,033.14 2,014.16
YVWD-12 2,094.66 2,081.92 2,062.26 2,037.96 2,020.26
YVWD-24 2,184.66 2,120.42 2,100.29 2,075.90 2,061.63
YVWD-49 2,082.24 2,076.94 2,056.68 2,033.31 2,014.03
Average 2,121.08 2,105.01 2,086.95 2,065.99 2,048.75
The YIHM predicts that future groundwater elevations with groundwater production constrained to the estimated sustainable yield of 4,955 AFY will remain above the minimum threshold levels associated with each RMP, but will fall below the measurable objective levels under the Future Baseline with Climate Change II scenario (Figures 3-22 to 3-34). The following conditions will trigger management actions to be implemented by the Yucaipa GSA:
1) If groundwater elevations decline at 50% or more of the RMPs below their respective measurable objective levels for two consecutive years, then the following management action will be implemented:
a) The net use of groundwater from the Calimesa management area will be reduced under a three-tier structure depending on the volume of groundwater in storage below the historical low of 798,700 AF.
Actions to be implemented under the three-tier structure are as follows:
i) The first tier extends from 798,700 to 790,700 AF, or the top 8,000 AF in the drought buffer (Figure 4- 1). Groundwater elevations at the RMPs that represent the historical low (i.e., the top of tier 1) range from 2,024 to 2,204 feet NAVD88 (Table 4-2). If groundwater elevations decline at 50% or more of the RMPs below their respective tier 1 levels for two consecutive years, then a net reduction in groundwater use by 5% of the estimated sustainable yield of 4,955 AFY, or by 250 AFY, is required. The Yucaipa GSA will implement this management action by either reducing groundwater production by 250 AFY, Redlands Regular Meeting of 01-18-2022 Page 598 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-7 October 2021
artificially recharging the aquifer with an additional 250 AFY of supplemental water, enacting water conservation programs or other programs that result in a net reduction of groundwater use by 250 AFY, or any combination of these actions that result in a net reduction of groundwater use by 250 AFY.
Currently, no interim milestones are defined because the management area is managed sustainably and conditions are at or above the measurable objective. However, if conditions decline to this first tier in the drought buffer, then this management action would be implemented and the Yucaipa GSA will identify interim milestones at that time to evaluate progress in achieving groundwater sustainability. ii) The second tier extends from 790,700 to 781,700 AF, or for 9,000 AF below the first tier in the drought buffer (Figure 4-1). Groundwater elevations at the RMPs that represent the top of tier 2 range from 1,994 to 2,202 feet NAVD88 (Table 4-2). If groundwater elevations decline at 50% or more of the RMPs below their respective tier 2 levels for two consecutive years, then a net reduction in groundwater use by 10% of the estimated sustainable yield of 4,955 AFY, or by 500 AFY, is required. The Yucaipa GSA will implement this management action by either reducing groundwater production by 500 AFY, artificially recharge the aquifer with an additional 500 AFY of supplemental water, enact water conservation programs or other programs that result in a net reduction of groundwater use by 500 AFY, or any combination of these actions that result in a net reduction of groundwater use by 500 AFY.
Currently, no interim milestones are defined because the management area is managed sustainably and conditions are at or above the measurable objective. However, if conditions decline to this second tier in the drought buffer, then this management action would be implemented and the Yucaipa GSA will identify interim milestones at that time to evaluate progress in achieving groundwater sustainability. iii) The third tier extends from 781,700 to 772,700 AF, or the bottom 9,000 AF in the drought buffer (Figure 4-1). Groundwater elevations at the RMPs that represent the top of tier 3 range from 1,972 to 2,191 feet NAVD88 (Table 4-2). If groundwater elevations decline at 50% or more of the RMPs below their respective tier 3 levels for two consecutive years, then a net reduction in groundwater use by 15% of the estimated sustainable yield of 4,955 AFY, or by 750 AFY, is required. The Yucaipa GSA will implement this management action by either reducing groundwater production by 750 AFY, artificially recharge the aquifer with an additional 750 AFY of supplemental water, enact water conservation programs or other programs that result in a net reduction of groundwater use by 750 AFY, or any combination of these actions that result in a net reduction of groundwater use by 750 AFY. Currently, no interim milestones are defined because the management area is managed sustainably and conditions are at or above the measurable objective. However, if conditions decline to this third tier in the drought buffer, then this management action would be implemented and the Yucaipa GSA will identify interim milestones at that time to evaluate progress in achieving groundwater sustainability. b) The 5% to 15% net reduction in groundwater use was selected because historical data indicated that, when groundwater production was at these rates or less, groundwater levels and the volume in storage were stable or increased during periods of “dry” to “wet” water year types (Figures 2-3, 3-19 and 3-21). The Yucaipa GSA, at its discretion, may modify the 5% to 15% reduction (e.g., implement a higher percentage of reduction) if these rates are not sufficient to improve conditions in the management area and avoid undesirable results.
c) Implementing this management action will also require the Yucaipa GSA to reevaluate and, possibly, recalibrate the YIHM to improve the accuracy of the model in predicting future conditions. This action will be implemented if the occurrence is outside the scheduled 5-year evaluation, which already includes a reevaluation of the YIHM.
Redlands Regular Meeting of 01-18-2022 Page 599 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-8 October 2021
2) If conditions continue to decline and groundwater elevations at 50% or more of the RMPs fall below their respective minimum threshold levels for two consecutive years, then the following management action will be implemented:
a) Groundwater elevations at the RMPs that represent the minimum threshold range from 1,959 to 2,177 feet NAVD88 (Table 4-2). The net use of groundwater from the Calimesa management area will be reduced by 20% of the estimated sustainable yield of 4,955 AFY, or by 990 AFY. The Yucaipa GSA will achieve this management action by either reducing groundwater production by 990 AFY, artificially recharging the aquifer with an additional 990 AFY of supplemental water, enacting water conservation programs or other programs that result in a net reduction of groundwater use by 990 AFY, or any combination of these actions that result in a net reduction of groundwater use by 990 AFY. Because the management area is not experiencing or is expected to experience conditions below the minimum threshold through the 50-year planning and implementation horizon, no interim milestones are defined in this GSP. However, if conditions do fall below the minimum threshold and this management action is implemented, then the Yucaipa GSA will identify interim milestones at that time to evaluate progress in improving conditions to achieve groundwater sustainability.
b) The 20% net reduction in groundwater use, which may be achieved with a reduction in groundwater production by 990 AFY to 3,955 AFY, was selected because historical data indicated that, when groundwater production was at 4,000 AFY or less, groundwater levels and the volume in storage were stable or increased during periods of “dry” to “wet” water year types (Figures 2-3, 3-19 and 3-21). The Yucaipa GSA, at its discretion, may modify the 20% reduction (e.g., implement a higher percentage of reduction) if this rate is not sufficient to improve conditions in the management area.
4.2.1.2.1 Measurable Objective Expected to Benefit
The measurable objective established for the sustainability indicators of chronic lowering of groundwater levels, reduction in groundwater storage, and land subsidence would benefit from the implementation of this management action. The goal of the management action is to reduce the net use of groundwater from the management area by 5% to 20% of the estimated sustainable yield until conditions improve to the measurable objective where the management area is managed sustainably and no undesirable results are experienced. Currently, groundwater conditions in the Calimesa management area are managed sustainably.
4.2.1.2.2 Expected Benefits and Evaluation
The sustainability criteria established for the Calimesa management area were designed to protect the long-term groundwater supply and maintain production for the existing wells operated by South Mountain, South Mesa, YVWD, and private users. The establishment of a drought buffer, represented by a range in the volume in storage from 798,700 to 772,700 AF, provides operational flexibility for the Yucaipa GSA to implement these management actions to avoid or improve conditions from undesirable results. These actions allow the management area to recover during “dry“ to “wet” water year types when recharge will exceed the net withdrawal of groundwater.
Groundwater in storage will increase and chronic declines in groundwater elevations will cease or reverse with a net reduction in groundwater use from the management area. Groundwater in storage will be measured using groundwater elevations as a proxy. If groundwater elevations stabilize, or rise at the groundwater level RMPs, the management action will have succeeded in increasing the volume of groundwater in storage and prevented the chronic decline in groundwater levels. Conditions at the measurable objective or higher are at or above the historical Redlands Regular Meeting of 01-18-2022 Page 600 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-9 October 2021
low, which will negate the undesirable result of land subsidence potentially occurring due to a long-term groundwater level decline below the historical low.
4.2.1.2.3 Circumstances for Implementation
This management action would be implemented under the following circumstances:
1. When groundwater levels measured at 50% or more of the RMPs fall below their respective measurable objective levels and drought buffer tiers for 2 consecutive years, or
2. When groundwater levels measured at 50% or more of the RMPs fall below their respective minimum threshold levels for 2 consecutive years.
4.2.1.2.4 Public Noticing
Public noticing is not required for this management action, which would be undertaken under the Yucaipa GSA’s authority to control groundwater withdrawals from the Calimesa management area. The Yucaipa GSA will notify private well owners that will be affected by the implementation of this management action if it requires a reduction in their respective groundwater production.
4.2.1.2.5 Permitting and Regulatory Process
No additional permitting or regulatory oversight is necessary to implement this management action, which would be undertaken under the Yucaipa GSA’s authority per Water Code, Section 10726.4.
4.2.1.2.6 Implementation Schedule
The YIHM predicts long-term fluctuations of groundwater elevations at the RMPs above the measurable objective until approximately 2058 when drier conditions prevail and groundwater levels experience a declining trend to the end of the 50-year planning and implementation horizon (Figures 4-2 to 4-14). The circumstance for implementing this management action when groundwater elevations at 50% or more of the RMPs decline below their respective tier 1 levels is predicted in 2066. This is based on predicted groundwater elevations at Hog Canyon 2, South Mesa 7, YVWD-10, YVWD-12, YVWD-49, USGS Equestrian Park #1, and USGS 6th Street #1 falling below their respective tier 1 levels by 2065 and remaining below those levels into 2067 (Figures 4-2, 4-6, 4-7, 4-9, 4-10, 4-11, and 4-13).
The Yucaipa GSA will implement this management action within six months from confirming the predicted declines in groundwater levels by reducing the net use of groundwater from the management area by 5%.
4.2.1.2.7 Legal Authority
Yucaipa GSA has the legal authority to operate and regulate the production from water supply wells in the Plan Area per Water Code, Section 10726.4; and to import surface water (e.g., SWP water) or other supplemental water to artificially recharge the Subbasin per Water Code, Section 10726.2. No additional legal authority is required.
4.2.1.2.8 Estimated Costs
The costs associated with the implementation of this management action have not yet been estimated. However, if this management action is implemented, then additional costs may be incurred by South Mountain, South Mesa, YVWD, or their respective customers, and private users to supply additional supplemental water, enact water Redlands Regular Meeting of 01-18-2022 Page 601 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-10 October 2021
conservation programs, or other actions to meet water demands. The responsibilities for covering costs between the water purveyors and private users, if applicable, will be determined at the time of implementation and will depend on their respective action and/or program implemented to achieve the overall goal of reducing the net use of groundwater from the management area.
4.2.1.3 Western Heights Management Area
The Western Heights management area includes seven RMPs, each associated with groundwater elevations representing the measurable objective at 408,800 AF and the minimum threshold at 398,800 AF in storage (Table 3-5; Table 4-3). The measurable objective is represented by the historical low condition and indicates that no undesirable results are occurring in the management area.
Table 4-3. Groundwater Elevations Pertaining to Management Actions for the Western Heights Management Area
Representative
Monitoring Point
Current
Groundwater
Elevations
(feet NAVD88)
Groundwater
Elevations at the
Measurable
Objective (Tier 1 of
Drought Buffer)
(feet NAVD88)
Groundwater
Elevations at Tier 2
of Drought Buffer
(feet NAVD88)
Groundwater
Elevations at the
Minimum Threshold
(feet NAVD88)
WHWC-2A 1,740.68 1,735.68 1,716.00 1,695.24
WHWC-10 1,766.04 1,750.04 1,734.04 1,714.26
WHWC-11 1,723.93 1,748.93 1,735.76 1,712.24
WHWC-12 1,757.11 1,747.11 1,732.52 1,708.84
WHWC-14 1,749.90 1,726.90 1,717.20 1,696.12
USGS Dunlap #2
(830 feet to 850
feet)
1,754.85 1,748.40 1,729.36 1,708.97
USGS Dunlap #4
(440 feet to 460
feet)
1,743.89 1,740.32 1,720.05 1,699.54
Average 1,748.06 1,742.48 1,726.42 1,705.03
The YIHM predicts that future groundwater elevations with groundwater production constrained to the estimated sustainable yield of 1,760 AFY will remain above the measurable objective levels associated with each RMP (Figures 3-40 to 3-46). However, the following conditions will trigger management actions to be implemented by the Yucaipa GSA should conditions decline below the measurable objective:
1) If groundwater elevations decline at 50% or more of the RMPs below their respective measurable objective levels for two consecutive years, then the following management action will be implemented:
a) The net use of groundwater from the Western Heights management area will be reduced under a two-tier structure depending on the volume of groundwater in storage below the historical low of 408,800 AF.
Actions to be implemented under the two-tier structure are as follows:
Redlands Regular Meeting of 01-18-2022 Page 602 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-11 October 2021
i) The first tier, which begins at the historical low, extends from 408,800 to 403,800 AF, or the top 5,000 AF in the drought buffer (Figure 4-15). Groundwater elevations at the RMPs that represent the historical low (i.e., the top of tier 1) range from 1,727 to 1,750 feet NAVD88 (Table 4-3). If groundwater elevations decline at 50% or more of the RMPs below their respective tier 1 levels for two consecutive years, then a net reduction in groundwater use by 5% of the estimated sustainable yield of 1,760 AFY, or 90 AFY, is required. The Yucaipa GSA will implement this management action by either reducing groundwater production by 90 AFY, artificially recharging the aquifer with an additional 90 AFY of supplemental water, enacting water conservation programs or other programs that result in a net reduction of groundwater use by 90 AFY, or any combination of these actions that result in a net reduction of groundwater use by 90 AFY. Currently, no interim milestones are defined because the management area is managed sustainably and conditions are at the measurable objective. However, if conditions decline to this first tier in the drought buffer, then this management action would be implemented and the Yucaipa GSA will identify interim milestones at that time to evaluate progress in achieving groundwater sustainability.
ii) The second tier extends from 403,800 to 398,800 AF, or the bottom 5,000 AF in the drought buffer (Figure 4-15). Groundwater elevations at the RMPs that represent the top of tier 2 range from 1,716 to 1,736 feet NAVD88 (Table 4-3). If groundwater elevations decline at 50% or more of the RMPs below their respective tier 2 levels for two consecutive years, then a net reduction in groundwater use by 10% of the estimated sustainable yield of 1,760 AFY, or by 180 AFY, is required. The Yucaipa GSA will implement this management action by either reducing groundwater production by 180 AFY, artificially recharging the aquifer with an additional 180 AFY of supplemental water, enacting water conservation programs or other programs that result in a net reduction of groundwater use by 180 AFY, or any combination of these actions that result in a net reduction of groundwater use by 180 AFY. Currently, no interim milestones are defined because the management area is managed sustainably and conditions are at the measurable objective. However, if conditions decline to this second tier in the drought buffer, then this management action would be implemented and the Yucaipa GSA will identify interim milestones at that time to evaluate progress in achieving groundwater sustainability. b) The 5% to 10% net reduction in groundwater use, which may be achieved with a reduction in groundwater production from 1,760 AFY to 1,670 AFY (5% less) or 1,580 AFY (10% less), was selected because historical data indicated that when groundwater production was at these rates or less groundwater levels and the volume in storage were stable or increased during periods of “dry” to “wet” water year types (Figures 2-34, 3-37, and 3-38). The Yucaipa GSA, at its discretion, may modify the 5% to 10% reduction (e.g., implement a higher percentage of reduction) if these rates are not sufficient to improve conditions in the management area and avoid undesirable results.
c) Implementing this management action will also require the Yucaipa GSA to reevaluate and, possibly, recalibrate the YIHM to improve the accuracy of the model in predicting future conditions. This action will be implemented if the occurrence is outside the scheduled 5-year evaluation, which already includes a reevaluation of the YIHM.
2) If conditions continue to decline and groundwater elevations at 50% or more of the RMPs fall below their respective minimum threshold levels for two consecutive years, then the following management action will be implemented:
a) The net use of groundwater from the Calimesa management area will be reduced by 15% of the estimated sustainable yield of 1,760 AFY, or by 260 AFY. Groundwater elevations at the RMPs that represent the minimum threshold range from 1,695 to 1,714 feet NAVD88 (Table 4-3). The Yucaipa GSA will achieve Redlands Regular Meeting of 01-18-2022 Page 603 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-12 October 2021
this management action by either reducing groundwater production by 260 AFY, artificially recharge the aquifer with an additional 260 AFY of supplemental water, enact water conservation programs or other programs that result in a net reduction of groundwater use by 260 AFY, or any combination of these actions that result in a net reduction of groundwater use by 260 AFY. Because the management area is not experiencing or is expected to experience conditions below the minimum threshold through the 50- year planning and implementation horizon, no interim milestones are defined in this GSP. However, if conditions do fall below the minimum threshold and this management action is implemented, then the Yucaipa GSA will identify interim milestones at that time to evaluate progress in improving conditions to achieve groundwater sustainability.
b) The 15% net reduction in groundwater use, which may be achieved with a reduction in groundwater production by 260 AFY from 1,760 AFY to 1,500 AFY, was selected because historical data indicated that, when groundwater production was at 1,500 AFY or less, groundwater levels and the volume in storage were stable or increased during periods of “dry” to “wet” water year types (Figures 2-34, 3-37, and 3-38). The Yucaipa GSA, at its discretion, may modify the 15% reduction (e.g., implement a higher percentage of reduction) if this rate is not sufficient to improve conditions in the management area.
4.2.1.3.1 Measurable Objective Expected to Benefit
The measurable objective established for the sustainability indicators of chronic lowering of groundwater levels, reduction in groundwater storage, and land subsidence would benefit from the implementation of this management action. The goal of the management action is to reduce the net use of groundwater from the management area by 5% to 15% of the estimated sustainable yield until conditions improve to the measurable objective where the management area is managed sustainably and no undesirable results are experienced. Currently, groundwater conditions in the Western Heights management area are managed sustainably.
4.2.1.3.2 Expected Benefits and Evaluation
The sustainability criteria established for the Western Heights management area were designed to protect the longterm groundwater supply and maintain production for the existing wells operated by WHWC and private users. The establishment of a drought buffer, represented by a range in the volume in storage from 408,800 to 398,800 AF, provides operational flexibility for the Yucaipa GSA to implement these management actions to avoid or improve conditions from undesirable results. These actions allow the management area to recover during “dry“ to “wet” water year types when recharge will exceed the net withdrawal of groundwater.
Groundwater in storage will increase and chronic declines in groundwater elevation will cease or reverse with a net reduction in groundwater use from the management area. Groundwater in storage will be measured using groundwater elevations as a proxy. If groundwater elevations stabilize, or rise at the groundwater level RMPs, the management action will have succeeded in increasing the volume of groundwater in storage and prevented a chronic decline in groundwater levels. Conditions at the measurable objective or higher are at or above the historical low, which will negate the undesirable result of land subsidence potentially occurring due to a long-term groundwater level decline below the historical low.
Redlands Regular Meeting of 01-18-2022 Page 604 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-13 October 2021
4.2.1.3.3 Circumstances for Implementation
This management action would be implemented under the following circumstances:
1. when groundwater levels measured at 50% or more of the RMPs fall below their respective measurable objective levels and drought buffer tiers for two consecutive years, or
2. when groundwater levels measured at 50% or more of the RMPs fall below their respective minimum threshold levels for two consecutive years.
4.2.1.3.4 Public Noticing
Public noticing is not required for this management action, which would be undertaken under the Yucaipa GSA’s authority to control groundwater withdrawals from the Western Heights management area. The Yucaipa GSA will notify private well owners that will be affected by the implementation of this management action if it requires a reduction in their respective groundwater production.
4.2.1.3.5 Permitting and Regulatory Process
No additional permitting or regulatory oversight is necessary to implement this management action, which would be undertaken under the Yucaipa GSA’s authority per Water Code, Section 10726.4.
4.2.1.3.6 Implementation Schedule
The YIHM predicts that groundwater elevations at the RMPs will not decline to tier 1 of the drought buffer through the 50-year planning and implementation horizon (Figures 4-16 to 4-22). Predicted groundwater elevations will not decline to tier 1 levels at more than 50% of the RMPs; therefore, there is no specific implementation schedule for this management action. However, the Yucaipa GSA will implement this management action within six months of determining that one of the criteria for implementation described in Section 4.2.1.3.3 has been met.
4.2.1.3.7 Legal Authority
Yucaipa GSA has the legal authority to operate and regulate the production from water supply wells in the Plan Area per Water Code, Section 10726.4; and to import surface water (e.g., SWP water) or other supplemental water to artificially recharge the Subbasin per Water Code, Section 10726.2. No additional legal authority is required.
4.2.1.3.8 Estimated Costs
The costs associated with the implementation of this management action have not yet been estimated. However, if this management action is implemented, then additional costs may be incurred by WHWC, or its respective customers, to supply additional supplemental water, enact water conservation programs, or other actions to meet water demands while reducing the net use of groundwater from the management area.
4.2.1.4 San Timoteo Management Area
The San Timoteo management area includes six RMPs to characterize shallow groundwater elevations and evaluate whether groundwater production from the principal aquifer will cause significant and unreasonable effects on the interconnection between surface water and groundwater. GDEs have been identified along the reach of San Redlands Regular Meeting of 01-18-2022 Page 605 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-14 October 2021
Timoteo Creek in the Plan Area and the following management actions are intended to protect the habitat sustained by surface water in the creek and the underlying shallow groundwater. No management actions were developed for the chronic lowering of groundwater elevations, reduction in groundwater storage, and land subsidence because no sustainability criteria were developed for these indicators (Sections 3.4.4 and 3.5.4).
A measurable objective was established for shallow groundwater levels at 20 feet bgs (Figure 3-48). The following management action will be implemented to prevent the significant and unreasonable effects to the interconnection of surface water and groundwater and to protect the GDEs sustained in the management area:
1) If groundwater levels decline at 50% or more of the RMPs below 20 feet bgs for two consecutive years, then the following management action will be implemented:
a) Confirm that the decline in the water table is a result of groundwater production from the principal aquifer.
This may include observing groundwater levels at the RMPs and measuring stream flow when the principal aquifer well(s) is operating, or designing and implementing an aquifer test to confirm the influence of groundwater production from the principal aquifer on stream flow and the groundwater table. Currently, only private users are extracting groundwater from this management area. The Yucaipa GSA will contact the private well owners to obtain information to assess whether pumping at a private well is the cause for the observed surface water flow and/or groundwater level declines. The Yucaipa GSA will request historical and projected pumping demands to better characterize conditions in this subarea and determine the extent of influence of pumping at the private well(s) on stream flow and shallow groundwater. b) If an aquifer test is conducted and confirms the influence of production from the principal aquifer on the surface water/groundwater interconnection and a subsequent drawdown of the water table, then production from the principal aquifer will be reduced to the extent that it no longer causes a significant and unreasonable effect.
4.2.1.4.1 Measurable Objective Expected to Benefit
The measurable objective established for the sustainability indicator of surface water/groundwater interconnection would benefit from the implementation of this management action. The goal of the management action is to prevent significant and unreasonable effects on GDEs sustained by the interaction of surface water and the underlying shallow groundwater. Currently, groundwater conditions in the San Timoteo management area are not experiencing undesirable results.
4.2.1.4.2 Expected Benefits and Evaluation
The sustainability criteria established for the San Timoteo management area were designed to protect the GDEs along San Timoteo Creek. This includes reducing groundwater production from the principal aquifer that directly influences stream flow in the creek and the underlying shallow groundwater that sustains the GDEs. YVWD monitors stream flow and shallow groundwater conditions along this reach of San Timoteo Creek as part of the HMP implemented in 2011 (Section 1.5.1.2). Monitoring includes collecting groundwater elevation data at shallow wells and evaluating habitat conditions via NDVI analysis along this reach of the creek. To date, HMP monitoring has indicated that significant fluctuations in groundwater levels and habitat conditions result from climatic conditions (i.e., prolong drought, large storm events) rather than by other potential factors like local groundwater production.
Redlands Regular Meeting of 01-18-2022 Page 606 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-15 October 2021
4.2.1.4.3 Circumstances for Implementation
This management action would be implemented under the following circumstances:
1. When groundwater levels measured at 50% of the RMPs fall below the measurable objective for 2 consecutive years.
4.2.1.4.4 Public Noticing
Public noticing is not required for this management action, which would be undertaken under the Yucaipa GSA’s authority to control groundwater withdrawals from the principal aquifer in the San Timoteo management area. The Yucaipa GSA will notify private well owners that will be affected by the implementation of this management action.
4.2.1.4.5 Permitting and Regulatory Process
No additional permitting or regulatory oversight is necessary to implement this management action, which would be undertaken under the Yucaipa GSA’s authority per Water Code, Section 10726.4.
4.2.1.4.6 Implementation Schedule
There is no specific implementation schedule for this management action. There is no indication of declining groundwater levels and stress on GDEs from the extraction of groundwater from the principal aquifer. The Yucaipa GSA will reach out to known and potential private well owners to obtain information on pumping schedules and volumes to better characterize conditions in this management area. This information will help inform the management action taken should groundwater elevations at three or more of the RMPs decline below the measurable objective.
4.2.1.4.7 Legal Authority
Yucaipa GSA has the legal authority to operate and regulate the production from water supply wells in the Plan Area per Water Code, Section 10726.4; and to import surface water (e.g., SWP water) or other supplemental water to artificially recharge the Subbasin per Water Code, Section 10726.2. No additional legal authority is required.
4.2.1.4.8 Estimated Costs
The costs associated with the implementation of this management action have not yet been estimated. Costs may be incurred by the Yucaipa GSA to reach out to the private well owners to collect the necessary information to better characterize conditions in this management area. If aquifer tests are required, then additional costs will be incurred by the Yucaipa GSA to conduct the tests, collect and analyze the test data, and develop an appropriate action or response based on the test data to ensure that no undesirable results occur in the management area. These costs will be assessed at the time such action is identified.
Redlands Regular Meeting of 01-18-2022 Page 607 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-16 October 2021
4.2.2 Management Action No. 2 – Sustainable Yield Pumping Allocations and Groundwater Replenishment
Groundwater sustainable yield pumping allocations will be assigned to YVWD and private water users in the North Bench Management Area, to South Mountain, South Mesa, YVWD and private water users in the Calimesa Management Area, and to WHWC in the Western Heights management area per the subsections below when this GSP is adopted. No sustainable yield pumping allocations were assigned in the San Timoteo management area at this time because the Yucaipa GSA needs to confirm the location and volume of private pumping from the principal aquifer and determine whether sustainable yield pumping allocations are appropriate to manage groundwater production in this management area. The pumping allocations are designed to regulate the annual volume of groundwater produced by each groundwater user and maintain the total groundwater produced at or below the estimated sustainable yields for these management areas. The sustainable yield pumping allocations will be reevaluated within three months (i.e., every December) of the end of a water year.
As an incentive to manage groundwater production at or below the sustainable yield pumping allocation, a groundwater user may earn pumping credits in the amount of the sustainable yield pumping allocation less the groundwater pumped. For example, if water purveyor A pumped 1,000 AF in a water year and the sustainable yield pumping allocation is 1,200 AFY, then water purveyor A earned a 200 AF pumping credit. The Yucaipa GSA will apply a 5-year rolling pumping credit system to keep account of the pumping credits earned by each water purveyor, meaning pumping credits that are earned and not used after 5 years will be lost. Pumping credits, if available, may be used to offset the volume of groundwater produced in excess of the sustainable yield pumping allocation to the extent that the credits equal the pumping exceedance. Any remaining deficit will be charged a replenishment fee. Any pumping credits remaining will carry over into the next water year under the 5-year rolling pumping credit system. The accounting of pumping credits will begin with the adoption of the GSP. The volume of water pumped per user will be accounted for on a monthly basis beginning February 2022. The initial assessment for pumping credits will occur at the conclusion of the 2022 WY, and then reassessed at the conclusion of subsequent water years. Pumping credits will be assigned to users that pump less than their respective sustainable yield pumping allocation, or a deficit will be assigned should the volume pumped exceed the sustainable yield pumping allocation. Pumping credits cannot be transferred or sold to another entity within a given management area or with the Subbasin.
As an alternative to using pumping credits to offset a pumping exceedance, a water purveyor may use surplus supplemental water that directly recharged the Subbasin (See Management Action No. 3, Section 4.2.3). If such water is available and accessible to the water purveyor, then this water may be used instead of pumping credits to offset the pumping exceedance.
The following provides a description of how the pumping allocations were assigned to each purveyor, and the management actions that will be implemented when a groundwater user exceeds their respective sustainable yield pumping allocation.
4.2.2.1 North Bench Management Area
YVWD and private users are the two groundwater users in the North Bench Management Area. From the 1966 WY to the 2018 WY, the average annual production rates for YVWD and private users were 2,647 AFY and 778 AFY, respectively (Figure 4-23, Table 4-4). Groundwater production by YVWD accounted for 77.3% of the total production, private users accounted for 22.7%. Applying these allocations to the estimated sustainable yield of 3,940 AFY for Redlands Regular Meeting of 01-18-2022 Page 608 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-17 October 2021
the North Bench management area, the sustainable yield pumping allocations for YVWD and private users are 3,045 AFY and 895 AFY, respectively (Table 4-4).
Table 4-4. Sustainable Yield Pumping Allocations in the North Bench Management Area Groundwater User
Average Historical
Pumping (AFY)
Historical Pumping
Allocation (%)
Sustainable Yield
Pumping Allocation (AFY)
YVWD 2,647 77.3% 3,045
Private 778 22.7% 895
Total 3,425 100.0% 3,940
The volume of groundwater produced will be quantified per water year (October 1 to September 30) with the total volumes reported to the Yucaipa GSA by the end of the calendar year. If a groundwater user exceeds their respective sustainable yield pumping allocation, then the groundwater user will be charged a replenishment fee equivalent to the volume of groundwater that exceeds the sustainable yield pumping allocation multiplied by the rate per AF to purchase supplemental water at San Bernardino Valley Municipal Water District (SBVMWD) rates for imported SWP water. If the groundwater user has accrued pumping credits or has surplus supplemental water available in the aquifer, then the pumping credits or surplus supplemental water may be applied up to the pumping exceedance. If there continues to be a deficit, then a replenishment fee will be charged to the groundwater user. The supplemental water required under this management action will be purchased in the subsequent water year, if available, and used to artificially recharge and replenish the Subbasin at the Wilson Creek spreading basins.
The historical production by private users was based on data from the USGS that was incorporated into the YIHM.
Figure 4-23 indicates that groundwater production by private users has been steadily declining since the early 1980s to where the average rate over the last 10 years has been approximately 160 AFY. The Yucaipa GSA will make efforts to contact private well users in this management area to confirm the estimated rate of groundwater production per private user. This will provide the Yucaipa GSA with information to characterize the influence of each individual private user on conditions in the management area, and to apply the appropriate pumping allocation.
The sustainable yield pumping allocations between YVWD and private users will be reassessed when data on the current and projected usage by private users is collected and analyzed.
4.2.2.1.1 Measurable Objective Expected to Benefit
The measurable objective established for the sustainability indicators of chronic lowering of groundwater levels, reduction in groundwater storage, and land subsidence would benefit from the implementation of this management action.
4.2.2.1.2 Expected Benefits and Evaluation
The goal of this management action is to replenish the management area when groundwater withdrawals exceed the sustainable yield pumping allocation assigned to a groundwater user. This action will prevent long-term declines in groundwater elevations and storage due to groundwater production above the sustainable yield, and help prevent conditions from falling below the historical low in groundwater levels that potentially cause significant and unreasonable effects due to land subsidence. Currently, groundwater extractions from the North Bench management area are below the estimated sustainable yield of 3,940 AFY (Figure 3-3).
Redlands Regular Meeting of 01-18-2022 Page 609 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-18 October 2021
The benefit of this management action will be evaluated after the purchase of replenishment water and subsequent discharge to the Wilson Creek and Oak Glen Creek spreading basins to replenish the Subbasin.
4.2.2.1.3 Circumstances for Implementation
This management action would be implemented when the volume of groundwater produced by a water purveyor and/or private user per water year exceeds their respective sustainable yield pumping allocation, and the use of pumping credits and/or surplus supplemental water (Section 4.2.3) was insufficient to offset the pumping exceedance. The groundwater user will be required to purchase supplemental water in the subsequent water year for replenishment purposes via the Wilson Creek and Oak Glen Creek spreading basins. If no supplemental water is available, then the volume to replenish will be held in account for up to 5 years until water is available or the groundwater user has earned pumping credits to offset this exceedance. If after 5 years there is no supplemental water available to replenish the management area and the groundwater user has not earned pumping credits to offset the exceedance, then a reassessment of the sustainable yield and pumping allocations will be conducted for the management area.
4.2.2.1.4 Public Noticing
Public noticing is not required for this management action, which would be undertaken under the Yucaipa GSA’s authority to control groundwater production from the North Bench management area and acquire surface water to direct to spreading basins and/or other purposes per Water Code Sections 10726.2 and 10726.4.
4.2.2.1.5 Permitting and Regulatory Process
No additional permitting or regulatory oversight is necessary to implement this management action, which would be undertaken under the Yucaipa GSA’s authority per Water Code Sections 10726.2 and 10726.4.
4.2.2.1.6 Implementation Schedule
This management action requires the purchase of supplemental water for replenishment purposes in the subsequent water year after the management action is implemented and the application of pumping credits and/or surplus supplemental water, if any, do not offset the pumping exceedance. If no supplemental water is available to replenish the Subbasin in the subsequent water year, then the replenishment water volume will be held in account for up to 5 years until there is supplemental water available or pumping credits are earned to offset the pumping exceedance.
4.2.2.1.7 Legal Authority
Yucaipa GSA has the legal authority to operate and regulate the production from water supply wells in the Plan Area per Water Code, Section 10726.4; and to import surface water (e.g., SWP water) or other supplemental water per Water Code, Section 10726.2. No additional legal authority is required.
4.2.2.1.8 Estimated Costs
The costs associated with the implementation of this management action are based on the volume of groundwater in excess of the sustainable yield pumping allocation and the rate of SWP water by SBVMWD per acre-foot.
Additional costs may be incurred for the distribution and delivery to the Wilson Creek and Oak Glen Creek spreading basins. The estimated costs may vary annually depending on the rate charged by SBVMWD for supplemental water to replenish the Subbasin.
Redlands Regular Meeting of 01-18-2022 Page 610 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-19 October 2021
4.2.2.2 Calimesa Management Area
The four groundwater users in the Calimesa Management Area are South Mountain, South Mesa, YVWD and private users. From the 1966 WY to the 2018 WY, the average annual production rates for South Mountain, South Mesa, YVWD and private users were 544 AFY, 2,056 AFY, 2,457 AFY and 143 AFY, respectively (Figure 4-24; Table 4-5).
Historically, groundwater production by South Mountain, South Mesa, YVWD and private users accounted for 10.5%,
39.5%, 47.2%, and 2.8%, respectively, of the average annual production of 5,200 AFY. Applying these allocations to the estimated sustainable yield of 4,955 AFY for the Calimesa management area, the sustainable yield pumping allocations for South Mountain, South Mesa, YVWD and private users are 518 AFY, 1,959 AFY, 2,341 AFY, and 137 AFY, respectively1 (Table 4-5).
Table 4-5. Sustainable Yield Pumping Allocations in the Calimesa Management Area Groundwater User
Average Historical
Pumping (AFY)
Historical Pumping
Allocation (%)
Sustainable Yield
Pumping Allocation (AFY)
YVWD 2,457 47.2% 2,341
South Mesa 2,056 39.5% 1,959
South Mountain 544 10.5% 518
Private 143 2.8% 137
Total 5,200 100.0% 4,955
The volume of groundwater produced will be quantified per water year (October 1 to September 30) with the total volumes reported to the Yucaipa GSA by the end of the calendar year. If a groundwater user exceeds their respective sustainable yield pumping allocation, then the groundwater user will be charged a fee equivalent to the volume of groundwater that exceeds their respective sustainable yield pumping allocation multiplied by the rate per AF of supplemental water supplied by SBVMWD and/or San Gorgonio Pass Water Agency (SGPWA) depending on the availability of supplemental water for purchase. The Calimesa management area straddles the boundary between San Bernardino County and Riverside County, which includes the service areas of SBVMWD and SGPWA. SWP water supplied by these two regionals may be available as a supplemental water source under this management action.
If a groundwater user has accrued pumping credits and/or surplus supplemental water that directly recharged the aquifer, then the pumping credits and/or surplus supplemental water may be applied to offset the pumping exceedance. If there continues to be a deficit, then a fee will be charged to the groundwater user to purchase supplemental water. The supplemental water will be purchased in the subsequent water year, if available, and used to artificially replenish the aquifer, if applicable, or as in lieu use to offset the pumping exceedance.
Currently, there are no spreading basins in the Calimesa management area, but the Yucaipa GSA member agencies are evaluating two potential sites to develop surface water spreading basins for the purposes of artificially recharging the Subbasin. The Yucaipa GSA will utilize the YIHM as a tool to evaluate the feasibility of operating spreading basis at the two proposed sites. The feasibility studies will evaluate the beneficial impact of recharging the aquifer at these two potential locations. In the meantime, the supplemental water may be used as in lieu use to offset the pumping exceedance.
1 In accordance with Water Code Section 10720.5, the sustainable yield allocations set forth in Management Action No. 2 are neither intended to nor actually comprise any determination of water rights.
Redlands Regular Meeting of 01-18-2022 Page 611 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-20 October 2021
The historical production by private users was based on data from the USGS that was incorporated into the YIHM.
Figure 4-24 indicates that groundwater production by private users has been steady at approximately 200 AFY since 2000. The Yucaipa GSA will make efforts to contact private well users in this management area to confirm the locations and estimated rates of groundwater extraction for the active private groundwater users. The sustainable yield pumping allocations between the water purveyors and individual private users will be reassessed when data on the current and projected usage by private users is collected and analyzed.
4.2.2.2.1 Measurable Objective Expected to Benefit
The measurable objective established for the sustainability indicators of chronic lowering of groundwater levels, reduction in groundwater storage, and land subsidence would benefit from the implementation of this management action.
4.2.2.2.2 Expected Benefits and Evaluation
The goal of this management action is to replenish the management area or reduce groundwater withdrawals when groundwater production exceeds the sustainable yield pumping allocation assigned to a groundwater user. This action will prevent long-term declines in groundwater elevations and storage due to groundwater production above the sustainable yield, and help prevent conditions from falling below the historical low in groundwater levels that potentially cause significant and unreasonable effects due to land subsidence. Currently, groundwater extractions from the Calimesa management area are below the sustainable yield of 4,955 AFY (Figure 3-19). Because there are no spreading basins in the Calimesa management area, the supplemental water may be used as in lieu use to offset the pumping exceedance.
4.2.2.2.3 Circumstances for Implementation
This management action would be implemented when the volume of groundwater produced by a water purveyor and/or private user per water year exceeds their respective sustainable yield pumping allocation. The groundwater user will be assessed a fee to purchase supplemental water if the application of pumping credits and/or surplus supplemental water, if available, do not offset the production exceedance. If no supplemental water is available to replenish the aquifer, then the volume to replenish will be held in account for up to 5 years until water is available or the groundwater user has earned pumping credits to offset this exceedance. If after 5 years there is no supplemental water available and the groundwater user has not earned pumping credits to offset the exceedance, then a reassessment of the sustainable yield and pumping allocations will be conducted for the management area.
4.2.2.2.4 Public Noticing
Public noticing is not required for this management action, which would be undertaken under the Yucaipa GSA’s authority to control groundwater production from the Calimesa management area and acquire surface water to import into the Plan Area per Water Code Sections 10726.2 and 10726.4.
4.2.2.2.5 Permitting and Regulatory Process
No additional permitting or regulatory oversight is necessary to implement this management action, which would be undertaken under the Yucaipa GSA’s authority per Water Code Sections 10726.2 and 10726.4.
Redlands Regular Meeting of 01-18-2022 Page 612 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-21 October 2021
4.2.2.2.6 Implementation Schedule
This management action requires the purchase of supplemental water in the subsequent water year after the management action is implemented and the application of pumping credits and/or surplus supplemental water, if any, do not offset the pumping exceedance. If no supplemental water is available in the subsequent water year to replenish the aquifer, then the supplemental water volume will be held in account for up to 5 years until there is supplemental water available or pumping credits are earned to offset the pumping exceedance.
4.2.2.2.7 Legal Authority
Yucaipa GSA has the legal authority to operate and regulate the production from water supply wells in the Plan Area per Water Code, Section 10726.4; and to import surface water (e.g., SWP water) or other supplemental water per Water Code, Section 10726.2. No additional legal authority is required.
4.2.2.2.8 Estimated Costs
The costs associated with the implementation of this management action are based on the volume of supplemental water required to offset the pumping exceedance after pumping credits and/or surplus supplemental water, if any, have been applied. The cost for supplying supplemental water for replenishment purposes or as in lieu water will be based on the rate of SWP water per AF by SBVMWD and/or SGPWA. Additional costs may be incurred for the distribution and delivery of supplemental water to the management area. The estimated costs may vary annually depending on the rate charged by the Regionals for supplemental water.
4.2.2.3 Western Heights Management Area
WHWC is the only groundwater user in the Western Heights Management Area. The sustainable yield pumping allocation to WHWC is the sustainable yield of 1,760 AFY. The volume of groundwater produced will be quantified per water year (Oct. 1 to Sep. 30) with the total volume reported to the Yucaipa GSA by the end of the calendar year.
If WHWC exceeds the sustainable yield, then WHWC will be charged a fee equivalent to the volume of groundwater that exceeds the sustainable yield multiplied by the rate per AF to purchase supplemental water at SBVMWD rates for imported SWP water. The supplemental water will be purchased in the subsequent water year, if available, and used as in lieu water to offset the pumping exceedance in the subsequent water year. There are no spreading basins in the Western Heights management area to receive SWP water.
4.2.2.3.1 Measurable Objective Expected to Benefit
The measurable objective established for the sustainability indicators of chronic lowering of groundwater levels, reduction in groundwater storage, and land subsidence would benefit from the implementation of this management action.
4.2.2.3.2 Expected Benefits and Evaluation
The goal of this management action is to replenish the management area or reduce groundwater withdrawals when groundwater production exceeds the sustainable yield. This action will prevent long-term declines in groundwater elevations and storage due to groundwater production above the sustainable yield, and help prevent conditions from falling below the historical low in groundwater levels that potentially cause significant and unreasonable effects due to land subsidence. Currently, groundwater extractions from WHWC in the Western Heights management area are below the sustainable yield of 1,760 AFY (Figure 3-37).
Redlands Regular Meeting of 01-18-2022 Page 613 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-22 October 2021
4.2.2.3.3 Circumstances for Implementation
This management action would be implemented when the volume of groundwater produced by WHWC per water year exceeds the sustainable yield. WHWC will be assessed a fee to purchase supplemental water if WHWC cannot apply pumping credits to offset the production exceedance. If no supplemental water is available, then the volume of supplemental water will be held in account for up to 5 years until water is available or the groundwater user has earned pumping credits to offset this exceedance. If after 5 years there is no supplemental water available and the groundwater user has not earned pumping credits to offset the exceedance, then a reassessment of the sustainable yield and pumping allocations will be conducted for the management area.
4.2.2.3.4 Public Noticing
Public noticing is not required for this management action, which would be undertaken under the Yucaipa GSA’s authority to control groundwater production and acquire surface water to import into the Plan Area per Water Code Sections 10726.2 and 10726.4.
4.2.2.3.5 Permitting and Regulatory Process
No additional permitting or regulatory oversight is necessary to implement this management action, which would be undertaken under the Yucaipa GSA’s authority per Water Code Sections 10726.2 and 10726.4.
4.2.2.3.6 Implementation Schedule
This management action requires the purchase of supplemental water as in lieu water in the subsequent water year after the management action is implemented. If no supplemental water is available, then the volume of supplemental water will be held in account for up to 5 years until there is supplemental water available or a reevaluation of the sustainable yield is conducted at the end of the 5-year limit.
4.2.2.3.7 Legal Authority
Yucaipa GSA has the legal authority to operate and regulate the production from water supply wells in the Plan Area per Water Code, Section 10726.4; and to import surface water (e.g., SWP water) or other supplemental water per Water Code, Section 10726.2. No additional legal authority is required.
4.2.2.3.8 Estimated Costs
The costs associated with the implementation of this management action are based on the volume of groundwater produced in excess of the sustainable yield and the rate of SWP water by SBVMWD per acre-foot. Additional costs may be incurred for the distribution and delivery to the Western Heights management area. The estimated costs may vary annually depending on the rate charged by SBVMWD for supplemental water to replenish the Subbasin.
4.2.2.4 San Timoteo Management Area
This management action does not apply to the San Timoteo Management Area.
Redlands Regular Meeting of 01-18-2022 Page 614 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-23 October 2021
4.2.3 Management Action No. 3 – Surplus Supplemental
Water Spreading
YVWD has purchased SWP water, when available, to artificially recharge the Subbasin via the Wilson Creek and Oak Glen Creek spreading basins (Section 2.5.4.2; Figure 2-21). This water has helped contribute to the recovery of the North Bench management area since it was first used to artificially recharge the Subbasin in 2011. The Yucaipa GSA will continue to obtain, when available, surplus supplemental water to artificially recharge the Subbasin to help maintain groundwater in storage above historical lows.
Surplus supplemental water, which is not associated with Management Action No. 2 (Section 4.2.2), and discharged to a spreading basin to facilitate the artificial recharge of the Subbasin will have a separate accounting by the Yucaipa GSA. The surplus supplemental water will be accessible to the water purveyor that purchased the water and percolated it at a spreading basin. This water will be available to help offset production exceedances above the sustainable yield pumping allocations instead of pumping credits earned via Management Action No. 2.
The Yucaipa GSA will conduct a study within the first year of adopting the GSP to estimate the amount of water lost from the point of discharge at a spreading basin to the water table. This study will estimate monthly losses due to evaporation of water from a spreading basin to water retained in the soil column between the bottom of a spreading basin and the underlying water table. The estimate of water loss will be applied to the volume of surplus supplemental water discharged on a monthly basis to a spreading basin. Monthly estimates of water loss are appropriate because evaporative losses in the summer are higher than in the winter. The remaining water will directly recharge the aquifer and be available to the water purveyor that purchased the water. The study will include the existing spreading basins and stormwater capture basins, and proposed basins that may be constructed in the Subbasin. Potential basins in the Calimesa management area would be evaluated to assess the effect of artificial recharge on the projected declines in groundwater in storage under the Future Baseline with Climate Change II scenario.
The YIHM was used to simulate the flow of water from the Wilson Creek and Oak Glen Creek spreading basins over the 50-year implementation and planning horizon. The YIHM indicated that water originating from these two spreading basins will remain in the North Bench Management Area over the 50-year period. The YIHM also indicated that water originating at the locations of two potential basins in the Calimesa management area would remain in the management area. Consequently, the accounting of surplus supplemental water that directly recharges the aquifer does not include additional losses when the water is in the aquifer.
4.2.3.1 Measurable Objective Expected to Benefit
The measurable objective established for the sustainability indicators of chronic lowering of groundwater levels, reduction in groundwater storage, and land subsidence would benefit from the implementation of this management action.
4.2.3.2 Expected Benefits and Evaluation
This management action provides the Yucaipa GSA with an accounting methodology to purchase surplus supplemental water and directly recharge the Subbasin. This water will be accessible to the water purveyor that Redlands Regular Meeting of 01-18-2022 Page 615 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-24 October 2021
purchased the water and directed it to a spreading basin. The water may be used to help offset pumping exceedances over the sustainable yield pumping allocation.
4.2.3.3 Circumstances for Implementation
This management action would be implemented when a water purveyor purchases surplus supplemental water and directly recharges the Subbasin.
4.2.3.4 Public Noticing
Public noticing is not required for this management action, which would be undertaken under the Yucaipa GSA’s authority to acquire surface water to import into the Plan Area per Water Code Section 10726.2.
4.2.3.5 Permitting and Regulatory Process
No additional permitting or regulatory oversight is necessary to implement this management action at existing spreading basins, which would be undertaken under the Yucaipa GSA’s authority per Water Code Section 10726.2.
New spreading basins or direct injection wells would require permitting and regulatory process services before installation and use. The Yucaipa GSA will complete the appropriate permitting and regulatory requirements to facilitate the design, installation, and operations of new facilities in order to enhance the recharge of surplus supplemental water in the Subbasin.
4.2.3.6 Implementation Schedule
This management action will be implemented when surplus supplemental water is available and purchased to directly recharge the Subbasin.
4.2.3.7 Legal Authority
Yucaipa GSA has the legal authority to import surface water (e.g., SWP water) or other supplemental water per Water Code, Section 10726.2. No additional legal authority is required.
4.2.3.8 Estimated Costs
The costs associated with the implementation of this management action are based on the volume of surplus supplemental water purchased from the regionals and the costs for directing the water to spreading basins to artificially recharge the Subbasin. The estimated costs may vary annually depending on the rate charged by SBVMWD and/or SGPWA for surplus supplemental water to replenish the Subbasin.
4.3 Projects
Currently, the Plan Area is not experiencing undesirable results with regard to the chronic lowering of groundwater elevations, reduction of groundwater in storage, land subsidence, and depletion of surface water as a result of groundwater production from the principal aquifer that threatens GDEs. The importation of SWP water as a Redlands Regular Meeting of 01-18-2022 Page 616 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-25 October 2021
supplemental source of water has allowed the Yucaipa GSA member agencies to reduce groundwater production in the North Bench, Calimesa and Western Heights management areas to levels below their respective estimated sustainable yields. Groundwater production by private well owners in the San Timoteo management area has not caused significant and unreasonable effects related to the sustainability indicators per the Sustainable Groundwater Management Act. The Subbasin is currently managed sustainably.
Measurable objectives defined for the North Bench, Calimesa and Western Heights management areas were based on volumes of groundwater in storage that represent historical low conditions (Calimesa and Western Heights) or conditions that are above historical lows (North Bench). The measurable objective defined for the San Timoteo management area was based on the presence of GDEs and maintaining a water table elevation within 20 feet below ground surface to sustain the GDEs.
Management actions (Section 4.2) were defined to achieve sustainable management of the groundwater resources in the Plan Area should groundwater elevations decline below measurable objectives. These actions will be implemented if groundwater levels decline to the drought buffers established for the North Bench, Calimesa and Western Heights management areas. The drought buffers provide operational flexibility for the Yucaipa GSA to implement these management actions and/or other programs to prevent undesirable results.
Some of the member agencies of the Yucaipa GSA have constructed stormwater capture basins to enhance recharge to the Subbasin (Table 4-6). The Wilson Creek and Oak Glen Creek spreading basins are designed to capture stormwater and are used to artificially recharge the Subbasin using surplus SWP water delivered by the SWP East Branch Extension. These basins are included in the YIHM to simulate their contributions to recharge to the Subbasin. The Wilson Creek and Oak Glen Creek basins have contributed an average 1,900 AFY and 170 AFY, respectively, of SWP water since 2011 (Table 2C-5). The other existing stormwater capture basins are estimated to capture approximately 1,800 AFY (Section 5.xxx). Recharge at these basins was not included in the future water budget analyses for the North Bench and Western Heights management areas using the YIHM, because these management areas are sustainably managed and are projected to not experience undesirable results over the 50- year planning and implementation horizon.
The Yucaipa GSA identified proposed projects that have been designed, permitted, and are undergoing development or will in the near future. These include the Wilson Creek III Basins, the Pendleton Avenue Low Water Crossing, and the Upper Wildwood Creek Basin (Table 4-7). These basins are designed to capture stormwater flows and enhance recharge to the Subbasin. The estimated average annual recharge contribution is approximately 1,500 AF. These basins will be located in the North Bench management area. As with the existing basins, these planned basins were not included in the future water budget analyses for the North Bench management area using the YIHM, because the North Bench management area is not projected to experience undesirable results over the 50-year planning and implementation horizon.
The Yucaipa GSA is evaluating potential sites to construct and operate spreading basins to enhance recharge in the Calimesa management area. The YIHM predicts that groundwater elevations will decline below the measurable objective under the Future Baseline with Climate Change II scenario within the 50-year planning and implementation horizon. Therefore, in addition to the management actions described in Section 4.2.1..2, the potential construction of one or two spreading basins will benefit users in this management area. The Yucaipa GSA will evaluate the proposed basin(s) after more details of their construction and operation are developed. The basins will be included in the YIHM and evaluated during the 5-year evaluation study after this GSP is adopted.
Redlands Regular Meeting of 01-18-2022 Page 617 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-26 October 2021
Table 4-6. Existing Surface Water Spreading Basins in the Yucaipa Subbasin Existing Projects
Lead Agency/
Designer Latitude Longitude
Management
Area
Hydrogeologic
Subarea Source Water
Estimated
Annual
Increase in
Groundwater
Recharge (AFY)
Tennessee St.
Basins
City of
Yucaipa
34.034215° −117.105489° Western Heights Western Heights Stormwater 300 Fremont Avenue
Low Water
Crossing
City of
Yucaipa
34.051403° −117.026008° North Bench Gateway Stormwater 300 Dunlap Channel
Basins
City of
Yucaipa
34.030576° −117.096333° Western Heights Western Heights Stormwater 600 Oak Glen Creek
Basins
City of
Yucaipa
34.044545° −117.031828° North Bench Wilson Creek/
Gateway
Stormwater 170
Wildwood Creek
Basins
City of
Yucaipa
34.014461° −117.018201° North Bench Oak Glen Stormwater 600 Wildwood Channel City of
Yucaipa
34.01292° −117.04551° Calimesa Calimesa Stormwater
Wilson Creek
Spreading Basins
City of
Yucaipa
34.05° −117.03° North Bench Gateway Stormwater/
SWP Water
1,900
Redlands Regular Meeting of 01-18-2022 Page 618 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-27 October 2021
Table 4−7. Planned Surface Water Spreading Basins in the Yucaipa Subbasin Existing/
Proposed
Projects
Lead Agency/
Designer Latitude Longitude
Management
Area
Hydrogeological
Subarea
Source
Water
Estimated
Annual
Increase in
Groundwater
Recharge
(AFY)
Estimated
Decrease in
Annual
Groundwater
Production
(AF)
Wilson Creek
III Basins
City of Yucaipa 34.044446° −117.042468° North Bench Gateway SWP Water / Stormwater
750 —
Pendleton
Avenue Low
Water
Crossing
City of Yucaipa 34.046855° −117.018298° North Bench Oak Glen Stormwater 500 — Upper
Wildwood
Creek Basin
City of Yucaipa 34.014126° −116.999070° North Bench Oak Glen Stormwater 250 — Salinity and
Groundwater
Enhancement
YVWD 34.006887° −117.095094° — — Recycled
Water
— 5000
Redlands Regular Meeting of 01-18-2022 Page 619 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-28 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 620 of 1274 Redlands Regular Meeting of 01-18-2022 Page 621 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-30 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 622 of 1274 Redlands Regular Meeting of 01-18-2022 Page 623 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-32 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 624 of 1274 Redlands Regular Meeting of 01-18-2022 Page 625 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-34 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 626 of 1274 Redlands Regular Meeting of 01-18-2022 Page 627 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-36 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 628 of 1274 Redlands Regular Meeting of 01-18-2022 Page 629 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-38 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 630 of 1274 Redlands Regular Meeting of 01-18-2022 Page 631 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-40 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 632 of 1274 Redlands Regular Meeting of 01-18-2022 Page 633 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-42 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 634 of 1274 Redlands Regular Meeting of 01-18-2022 Page 635 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-44 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 636 of 1274 Redlands Regular Meeting of 01-18-2022 Page 637 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-46 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 638 of 1274 Redlands Regular Meeting of 01-18-2022 Page 639 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-48 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 640 of 1274 Redlands Regular Meeting of 01-18-2022 Page 641 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-50 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 642 of 1274 Redlands Regular Meeting of 01-18-2022 Page 643 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-52 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 644 of 1274 Redlands Regular Meeting of 01-18-2022 Page 645 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-54 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 646 of 1274 Redlands Regular Meeting of 01-18-2022 Page 647 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-56 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 648 of 1274 Redlands Regular Meeting of 01-18-2022 Page 649 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-58 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 650 of 1274 Redlands Regular Meeting of 01-18-2022 Page 651 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-60 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 652 of 1274 Redlands Regular Meeting of 01-18-2022 Page 653 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-62 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 654 of 1274 Redlands Regular Meeting of 01-18-2022 Page 655 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-64 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 656 of 1274 Redlands Regular Meeting of 01-18-2022 Page 657 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-66 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 658 of 1274 Redlands Regular Meeting of 01-18-2022 Page 659 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-68 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 660 of 1274 Redlands Regular Meeting of 01-18-2022 Page 661 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-70 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 662 of 1274 Redlands Regular Meeting of 01-18-2022 Page 663 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-72 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 664 of 1274 Redlands Regular Meeting of 01-18-2022 Page 665 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-74 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 666 of 1274 Redlands Regular Meeting of 01-18-2022 Page 667 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 4 – PROJECTS AND MANAGEMENT ACTIONS
11507
4-76 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 668 of 1274 11507
5-1 October 2021
5 Plan Implementation
5.1 Introduction to Plan Implementation
Upon adoption of this GSP by the Yucaipa GSA, the primary activities associated with implementing the GSP include administrative duties by the member agencies of the Yucaipa GSA, the management of data collection, data validation, and analysis to evaluate conditions in the Subbasin, the preparation and submittal of annual reports and periodic evaluations, with associated data, to DWR, and an assessment of conditions in the Subbasin and determination if management actions need to be implemented. During the initial 5-year period after the GSP is adopted, the Yucaipa GSA will evaluate options to address data gaps identified in Section 2.6.3, and conduct feasibility studies to evaluate the effectiveness of potential spreading basins and other programs that would maintain or achieve sustainability in the Subbasin.
5.2 GSP Administration
The Yucaipa GSA is responsible for implementing the GSP after it is adopted. The administrative duties of the Yucaipa GSA include, at a minimum, the following:
• Adhering to the implementation schedule (Figure 5-1) to ensure that the Yucaipa GSA conducts the required minimum data collection periods in the Spring and Fall every year, the annual reports are prepared and submitted to DWR by April 1, and the periodic evaluation reports are submitted at least every 5 years or when the GSP is amended.
• Facilitate access to all wells and stream flow gauging stations in the monitoring network, including the RMPs in each management area, to ensure the collection of representative data by following the monitoring protocols presented in Section 3.6.4.
• Validate and upload data to the DMS for the purposes of evaluating conditions in the Plan Area. • Facilitate the submission of annual reports and periodic evaluation reports per Sub article 7 of Article 5 of the California Code of Regulations Division 2 Chapter 1.5 (23 California Code of Regulations, Section 356).
This section describes the procedures and requirements for preparing and submitting the annual reports and periodic evaluations to DWR.
• Facilitate public engagement.
The costs associated with administering the GSP will be shared per the MOA (Appendix 1-B). The MOA established a cost share structure with the water purveyors responsible for 75% and the San Bernardino Valley Municipal Water District and San Gorgonio Pass Water Agency (Regionals) and the Municipalities responsible for 25% of the costs associated with the administration of the Yucaipa GSA and the development and implementation of the GSP. In general, Yucaipa GSA plans to fund operating costs by using general operating funds, charging its customers through water rates, and/or fees assessed to new developments to connect to existing water services (public water supply, sanitary sewer). The estimated annual costs for implementing the GSP, including the estimated share in costs for each water purveyor and each Municipality and Regional, are summarized in Table 5-1.
Redlands Regular Meeting of 01-18-2022 Page 669 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 5 – PLAN IMPLEMENTATION
11507
5-2 October 2021
Table 5-1. Estimated Annual Costs for Implementing the GSP GSP Implementation Task
Estimated
Annual Cost
Each Water
Purveyor
Each
Municipality
and Regional
GSA Administrative Costs $20,000.00 $3,750.00 $1,250.00 Public Engagement $5,000.00 $937.50 $312.50
GSP Annual Reports $30,000.00 $5,625.00 $1,875.00
GSP Periodic Evaluations (includes update, refine,
recalibrate numerical model)
$40,000.00 $7,500.00 $2,500.00
DMS Management $5,000.00 $937.50 $312.50
Groundwater Level Monitoring (includes
installation/maintenance to obtain data, QA/QC,
measuring devices)
$15,000.00 $2,812.50 $937.50
Groundwater Production Monitoring (includes
installation/maintenance to obtain data, QA/QC,
meter calibration)
$10,000.00 $1,875.00 $625.00
Groundwater Quality Monitoring (includes
installation/maintenance to obtain data, QA/QC, field
meters)
$15,000.00 $2,812.50 $937.50
Install, Maintain Monitoring Wells $15,000.00 $2,812.50 $937.50 Surface Water Stream Flow Gaging Stations
Installation and Maintenance Program
$15,000.00 $2,812.50 $937.50
Total $170,000.00 $31,875.00 $10,625.00
The first five GSP Implementation tasks listed in Table 5-1, GSP Administrative Costs, Public Engagement, GSP Annual Reports, GSP Periodic Evaluations, and DMS Management, are categorized as administrative tasks in which each member agency of the Yucaipa GSA will provide funds at the beginning of each calendar year to cover their estimated annual costs. The last five GSP Implementation tasks listed in Table 5-1, Groundwater Level Monitoring, Groundwater Production Monitoring, Groundwater Quality Monitoring, Installation and Maintenance of Wells in the Monitoring Network, and the Installation and Maintenance of Surface Water Gaging Stations are categorized as monitoring and data collection tasks in which each member agency of the Yucaipa GSA will provide funds as costs are incurred when implementing these tasks. The annual costs listed in Table 5-1 are estimated based on an understanding of current conditions and anticipation of the level of effort in implementing the GSP. These estimated costs will be reevaluated every year and may be modified based on actual costs incurred after the GSP is adopted and implemented.
Table 5-2 provides a summary of the estimated annual costs for each water purveyor and each Municipality and Regional of the Yucaipa GSA.
Redlands Regular Meeting of 01-18-2022 Page 670 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 5 – PLAN IMPLEMENTATION
11507
5-3 October 2021
Table 5-2. Estimated Annual Costs for Each Water Purveyor and Each Municipality and Regional Yucaipa GSA Member Agency
Estimated Annual
Upfront Costs
Estimated Annual
Incurred Costs
Estimated Total
Annual Cost
Water Purveyors
South Mesa $18,750.00 $13,125.00 $31,875.00
South Mountain $18,750.00 $13,125.00 $31,875.00
WHWC $18,750.00 $13,125.00 $31,875.00
YVWD $18,750.00 $13,125.00 $31,875.00
Municipality and
Regional
City of Redlands $6,250.00 $4,375.00 $10,625.00
City of Yucaipa $6,250.00 $4,375.00 $10,625.00
SBVMWD $6,250.00 $4,375.00 $10,625.00
SGPWA $6,250.00 $4,375.00 $10,625.00
Estimated Total Annual Cost $100,000.00 $70,000.00 $170,000.00
5.3 Data Collection, Validation, and DMS
Member agencies of the Yucaipa GSA will continue participating in monitoring programs already implemented (Section 1.5.1) to collect groundwater elevation, groundwater quality, and production data to characterize conditions in the Subbasin. The member agencies will follow the monitoring protocols presented in Section 3.6.4 to collect data that is accurate and representative of conditions in the Subbasin, and will upload the data to the DMS. As discussed in Section 3.6, the monitoring schedule to collect static groundwater elevation data, at a minimum, is March 9 to 22 for the spring and October 9 to 22 for the fall. The recommended frequency to collect static groundwater elevation data is monthly. Water quality data is collected per the monitoring requirements under Title 22 for municipal water supply wells and the MBMP, and water quality sampling will follow the monitoring protocols presented in Section 3.6.4.3.
The water purveyors use calibrated flow meters and totalizers to track the volume of groundwater extracted at their respective municipal and irrigation water supply wells. Production data is collected on a monthly basis. Precipitation gauges have been maintained and monitored by the SBCFCD and the USGS, both of which are public agencies that provide their respective data in the public domain. The Yucaipa GSA will access this data and upload it to the DMS.
During the initial 5-year period after the GSP is adopted, the Yucaipa GSA will evaluate options for filling data gaps identified in this GSP. The primary data gaps identified were a lack of knowledge of existing private well users operating in the Subbasin, spatial gaps in groundwater elevation data in the eastern section of the Calimesa management area, and stream flow gauging stations to measure low to normal flows. As discussed in Section 3.6.6, the Yucaipa GSA will make efforts to obtain information on private well users, improve existing or install new stream flow gauging stations to enhance the characterization of stream flow in the Plan Area, and improve the spatial and temporal monitoring coverage of the Subbasin. For instance, pressure transducers may be installed at some wells in the monitoring network to reduce the time-window over which groundwater elevations are manually collected.
The costs of obtaining information from private well users, improving the monitoring of surface water flows, and addressing data gaps in the monitoring network are associated with GSP implementation.
Redlands Regular Meeting of 01-18-2022 Page 671 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 5 – PLAN IMPLEMENTATION
11507
5-4 October 2021
5.4 Annual Reports
Sub article 7 of Article 5 of the California Code of Regulations Division 2 Chapter 1.5 (23 CCR, Section 356.2) describes the general requirements for the annual reports to be submitted to DWR after the GSP is adopted by the Yucaipa GSA. Annual reports are due to DWR by April 1 of each year following the adoption of the GSP. Each annual report shall include the following components:
• General information, including an executive summary and a location map depicting the basin, jurisdictional boundaries, and Plan Area covered by the report.
• A detailed description and graphical representation of:
o Groundwater elevation data from wells identified in the monitoring network, o Groundwater elevation contour maps depicting, at a minimum, the seasonal high and seasonal low groundwater elevations observed in the preceding year,
o Groundwater elevation hydrographs depicting historical trends updated with data collected in the preceding year,
o Groundwater extractions for the preceding water year, o An accounting of surface water supply, including imported SWP water, imported groundwater from outside the Plan Area, and surface water diversions,
o An accounting of total water use and identity of the water use sector, o Change in groundwater in storage,
• A description of progress toward implementing the GSP, including implementation of projects or management actions since the previous annual report.
The description and graphical representation of the change in groundwater storage will include a graph depicting water year type, based on the annual precipitation in the Plan Area compared to the mean annual rainfall (Section
2.2.1.4), groundwater production, the annual change in groundwater in storage, and the cumulative change in groundwater in storage for the Plan Area based on the simulated annual change in storage by the YIHM. The annual reports will conclude with an overview of the implementation of the GSP, including an evaluation of groundwater conditions against the sustainability criteria established in Chapter 3. The annual report will include a descriptive summary of any management actions that were implemented in the Plan Area.
5.5 Periodic Evaluations
Every fifth year of GSP implementation and whenever the GSP is amended, the Yucaipa GSA is required to prepare and submit an Agency Evaluation and Assessment Report to DWR together with the annual report for that year (23 CCR, Section 356.4). The tasks associated with preparing this report include evaluating any new information that has been made available since the GSP adoption and assessing whether changes to assumptions or descriptions in the GSP are required. The following components are required in the periodic evaluation reports:
• A description of current groundwater conditions for each applicable sustainability indicator relative to measurable objectives and minimum thresholds.
• A description of the implementation of any projects or management actions, and the effect on groundwater conditions resulting from those projects or management actions.
Redlands Regular Meeting of 01-18-2022 Page 672 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 5 – PLAN IMPLEMENTATION
11507
5-5 October 2021
• A review and evaluation of the Plan Area setting, management areas, sustainability criteria and management actions described in the GSP, and proposed revisions to the GSP based on information obtained since the adoption of the Plan.
• A description and evaluation of the monitoring network within the Plan Area. The evaluation will determine if data gaps identified in the GSP have been addressed, and if new data gaps are identified. The periodic evaluation will include proposed actions by the Yucaipa GSA to address data gaps, which may include modifications to or expansion of the existing monitoring network. • A description of significant new information that has been made available since the adoption of the GSP, an amendment to the GSP, or the last 5-year assessment. • A description of relevant actions taken by the Yucaipa GSA, including a summary of regulations or ordinances related to management of the Plan Area or the GSP.
• Information describing any enforcement or legal actions taken by the Yucaipa GSA in furtherance of the sustainability goal for the Plan Area.
• A description of completed or proposed GSP amendments. • A reevaluation of the estimated sustainable yield of the Subbasin and the management areas by updating the YIHM with data collected since the last periodic evaluation.
5.6 GSP Implementation Schedule
The Yucaipa GSA has developed a schedule that outlines the approximate times at which the various monitoring and reporting components of the GSP will be implemented over the next 5 years (Figure 5-1). The actual start dates may vary from those shown in the schedule.
Redlands Regular Meeting of 01-18-2022 Page 673 of 1274 ADMINISTRATIVE DRAFT – GROUNDWATER SUSTAINABILITY PLAN FOR THE YUCAIPA SUBBASIN CHAPTER 5 – PLAN IMPLEMENTATION
11507
5-6 October 2021
INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 01-18-2022 Page 674 of 1274 Redlands Regular Meeting of 01-18-2022 Page 675 of 1274 Redlands Regular Meeting of 01-18-2022 Page 676 of 1274 Appendix 1-A
Preparation Checklist for GSP Submittal
Redlands Regular Meeting of 01-18-2022 Page 677 of 1274 Redlands Regular Meeting of 01-18-2022 Page 678 of 1274 Redlands Regular Meeting of 01-18-2022 Page 679 of 1274
Guidance Document for the Sustainable Management of Groundwater Preparation Checklist for GSP Submittal
December 2016
The objective of this Guidance Document is to provide Groundwater Sustainability Agencies (GSAs) and other interested stakeholders a checklist of Groundwater Sustainability Plan (GSP) content requirements for the purpose of verifying a GSP is complete and is ready for submission to DWR. Please note that if multiple GSAs develop multiple GSPs for a basin, the coordinated submission of those GSPs shall not occur until the entire basin is covered by GSPs.
The Preparation Checklist for GSP Submittal is only intended to provide a guide to GSAs and other stakeholders. This guidance is optional, since the content of this Guidance Document does not create any new requirements or obligations for the GSA or other stakeholders.
Guidance documents are not a substitute for the GSP Emergency Regulations (GSP Regulations) or the Sustainable Groundwater Management Act (SGMA). Those GSAs submitting a GSP are strongly encouraged to read the GSP Regulations and SGMA. In addition, using this Guidance Document to develop a GSP using does not equate to an approval determination by DWR.
Context with GSP Regulations
The Preparation Checklist for GSP Submittal can be used by GSAs in conjunction with the GSP Annotated Outline Guidance Document as a method to develop a GSP consistent with the requirements of the GSP Regulations and SGMA. The detailed requirements of a GSP may be found in the GSP Regulations, primarily in Article 5 – Plan Contents, and in SGMA, primarily in Chapter 6 beginning with California Water Code (CWC) Section 10727. The checklist includes references to applicable GSP Regulations sections and CWC sections, as well as a brief description of the required GSP information. The checklist also contains a column for GSAs to record the page number, or section of the GSP, where the information for that particular requirement is found.
The preparation checklist may also be included in the GSP.
Table 1 contains the Preparation Checklist for GSP Submittal.
California Department of Water Resources
Sustainable Groundwater Management Program
1416 Ninth Street
P.O. Box 942836
Sacramento, CA 94236-0001
www.water.ca.gov/groundwater
Redlands Regular Meeting of 01-18-2022 Page 680 of 1274
Table 1. Preparation Checklist for GSP Submittal
GSP
Regulations
Section
Water Code
Section Requirement Description
Section(s) or
Page Number(s)
in the GSP
Article 3. Technical and Reporting Standards
352.2 Monitoring
Protocols
• Monitoring protocols adopted by the GSA for data
collection and management
• Monitoring protocols that are designed to detect changes in groundwater levels, groundwater quality, inelastic
surface subsidence for basins for which subsidence has
been identified as a potential problem, and flow and quality of surface water that directly affect groundwater levels or quality or are caused by groundwater extraction in the
basin
Article 5. Plan Contents, Subarticle 1. Administrative Information 354.4 General Information • Executive Summary
• List of references and technical studies
354.6 Agency Information • GSA mailing address
• Organization and management structure
• Contact information of Plan Manager
• Legal authority of GSA
• Estimate of implementation costs
354.8(a) 10727.2(a)(4) Map(s) • Area covered by GSP
• Adjudicated areas, other agencies within the basin, and areas covered by an Alternative
• Jurisdictional boundaries of federal or State land
• Existing land use designations
• Density of wells per square mile
Section 3.6.4
Section 1.2
Section 1.3
Section ES
Redlands Regular Meeting of 01-18-2022 Page 681 of 1274
Information regarding the implementation of land use
plans outside the basin that could affect the ability of the Agency to achieve sustainable groundwater management
GSP Section(s) or Water Code Regulations Requirement Description Page Number(s) Section Section in the GSP Article 5. Plan Contents, Subarticle 1. Administrative Information (Continued) 354.8(b) Description of the
Plan Area
• Summary of jurisdictional areas and other features
354.8(c)
354.8(d)
354.8(e)
10727.2(g) Water Resource
Monitoring and
Management
Programs
• Description of water resources monitoring and
management programs
• Description of how the monitoring networks of those plans will be incorporated into the GSP
• Description of how those plans may limit operational
flexibility in the basin
• Description of conjunctive use programs
354.8(f) 10727.2(g) Land Use Elements
or Topic Categories
of Applicable
General Plans
• Summary of general plans and other land use plans
• Description of how implementation of the GSP may change water demands or affect achievement of sustainability and how the GSP addresses those effects
• Description of how implementation of the GSP may affect the water supply assumptions of relevant land use plans • Summary of the process for permitting new or replacement wells in the basin
•
Section 1.3
Section 1.5
Section 1.6
Redlands Regular Meeting of 01-18-2022 Page 682 of 1274
GSP Section(s) or Water Code Regulations Requirement Description Page Number(s) Section Section in the GSP Article 5. Plan Contents, Subarticle 1. Administrative Information (Continued) 354.8(g) 10727.4 Additional GSP
Contents
Description of Actions related to:
• Control of saline water intrusion
• Wellhead protection
• Migration of contaminated groundwater
• Well abandonment and well destruction program
• Replenishment of groundwater extractions
• Conjunctive use and underground storage
• Well construction policies
• Addressing groundwater contamination cleanup, recharge, diversions to storage, conservation, water recycling,
conveyance, and extraction projects
• Efficient water management practices
• Relationships with State and federal regulatory agencies • Review of land use plans and efforts to coordinate with land use planning agencies to assess activities that
potentially create risks to groundwater quality or quantity • Impacts on groundwater dependent ecosystems
354.10 Notice and
Communication
• Description of beneficial uses and users
• List of public meetings
• GSP comments and responses
• Decision-making process
• Public engagement
• Encouraging active involvement
• Informing the public on GSP implementation progress
Sections 1.7,
1.8 and 1.9
Sections 1.5,
1.6, 2.7,
2.7.8.1, and
4.2.2. Redlands Regular Meeting of 01-18-2022 Page 683 of 1274
GSP Section(s) or Water Code Regulations Requirement Description Page Number(s) Section Section in the GSP Article 5. Plan Contents, Subarticle 2. Basin Setting
354.14 Hydrogeologic
Conceptual Model
• Description of the Hydrogeologic Conceptual Model
• Two scaled cross-sections
• Map(s) of physical characteristics: topographic information, surficial geology, soil characteristics, surface water bodies, source and point of delivery for imported water supplies 354.14(c)(4) 10727.2(a)(5) Map of Recharge
Areas
• Map delineating existing recharge areas that substantially contribute to the replenishment of the basin, potential recharge areas, and discharge areas
10727.2(d)(4) Recharge Areas • Description of how recharge areas identified in the plan substantially contribute to the replenishment of the basin 354.16 10727.2(a)(1)
10727.2(a)(2)
Current and
Historical
Groundwater
Conditions
• Groundwater elevation data
• Estimate of groundwater storage
• Seawater intrusion conditions
• Groundwater quality issues
• Land subsidence conditions
• Identification of interconnected surface water systems • Identification of groundwater-dependent ecosystems
354.18 10727.2(a)(3) Water Budget
Information
• Description of inflows, outflows, and change in storage • Quantification of overdraft
• Estimate of sustainable yield
• Quantification of current, historical, and projected water budgets
10727.2(d)(5) Surface Water
Supply
• Description of surface water supply used or available for use for groundwater recharge or in-lieu use
Section 2.6
Section 2.7
Section 2.8
Section 2.8.2.5
Section 2.3
Section 2.5.4
Redlands Regular Meeting of 01-18-2022 Page 684 of 1274
GSP Section(s) or Water Code Regulations Requirement Description Page Number(s) Section Section in the GSP Article 5. Plan Contents, Subarticle 2. Basin Setting (Continued) 354.20 Management Areas • Reason for creation of each management area • Minimum thresholds and measurable objectives for each management area
• Level of monitoring and analysis
• Explanation of how management of management areas will not cause undesirable results outside the management
area
• Description of management areas
Article 5. Plan Contents, Subarticle 3. Sustainable Management Criteria 354.24 Sustainability Goal • Description of the sustainability goal 354.26 Undesirable Results • Description of undesirable results • Cause of groundwater conditions that would lead to
undesirable results
• Criteria used to define undesirable results for each
sustainability indicator
• Potential effects of undesirable results on beneficial uses and users of groundwater
354.28 10727.2(d)(1)
10727.2(d)(2)
Minimum
Thresholds
• Description of each minimum threshold and how they were established for each sustainability indicator
• Relationship for each sustainability indicator
• Description of how selection of the minimum threshold may affect beneficial uses and users of groundwater
• Standards related to sustainability indicators
• How each minimum threshold will be quantitatively
measured
Sections 2.9,
3.4, and 3.5.
Section 3.2
Section 3.3
Section 3.4
Redlands Regular Meeting of 01-18-2022 Page 685 of 1274
GSP Section(s) or Water Code Regulations Requirement Description Page Number(s) Section Section in the GSP Article 5. Plan Contents, Subarticle 3. Sustainable Management Criteria (Continued) 354.30 10727.2(b)(1)
10727.2(b)(2)
10727.2(d)(1)
10727.2(d)(2)
Measureable
Objectives
• Description of establishment of the measureable objectives for each sustainability indicator
• Description of how a reasonable margin of safety was
established for each measureable objective
• Description of a reasonable path to achieve and maintain the sustainability goal, including a description of interim milestones
Article 5. Plan Contents, Subarticle 4. Monitoring Networks 354.34 10727.2(d)(1)
10727.2(d)(2)
10727.2(e)
10727.2(f)
Monitoring
Networks
• Description of monitoring network
• Description of monitoring network objectives
• Description of how the monitoring network is designed to:
demonstrate groundwater occurrence, flow directions, and hydraulic gradients between principal aquifers and surface water features; estimate the change in annual groundwater in storage; monitor seawater intrusion; determine
groundwater quality trends; identify the rate and extent of land subsidence; and calculate depletions of surface water caused by groundwater extractions
• Description of how the monitoring network provides
adequate coverage of Sustainability Indicators
• Density of monitoring sites and frequency of
measurements required to demonstrate short-term,
seasonal, and long-term trends
• Scientific rational (or reason) for site selection
• Consistency with data and reporting standards
• Corresponding sustainability indicator, minimum threshold, measureable objective, and interim milestone
Sections 3.5
and 4.2
Section 3.6
Redlands Regular Meeting of 01-18-2022 Page 686 of 1274
GSP Section(s) or Water Code Regulations Requirement Description Page Number(s) Section Section in the GSP (Monitoring Networks Continued)
• Location and type of each monitoring site within the basin displayed on a map, and reported in tabular format,
including information regarding the monitoring site type, frequency of measurement, and the purposes for which the monitoring site is being used
• Description of technical standards, data collection
methods, and other procedures or protocols to ensure
comparable data and methodologies
354.36 Representative
Monitoring
• Description of representative sites
• Demonstration of adequacy of using groundwater
elevations as proxy for other sustainability indicators • Adequate evidence demonstrating site reflects general conditions in the area
354.38 Assessment and
Improvement of
Monitoring Network
• Review and evaluation of the monitoring network
• Identification and description of data gaps
• Description of steps to fill data gaps
• Description of monitoring frequency and density of sites Section 3.6.5.
Section 3.6.6.
Redlands Regular Meeting of 01-18-2022 Page 687 of 1274
GSP Section(s) or Water Code Regulations Requirement Description Page Number(s) Section Section in the GSP Article 5. Plan Contents, Subarticle 5. Projects and Management Actions 354.44 Projects and
Management
Actions
• Description of projects and management actions that will help achieve the basin’s sustainability goal
• Measureable objective that is expected to benefit from each project and management action
• Circumstances for implementation
• Public noticing
• Permitting and regulatory process
• Time-table for initiation and completion, and the accrual of expected benefits
• Expected benefits and how they will be evaluated
• How the project or management action will be
accomplished. If the projects or management actions rely on water from outside the jurisdiction of the Agency, an explanation of the source and reliability of that water shall be included.
• Legal authority required
• Estimated costs and plans to meet those costs
• Management of groundwater extractions and recharge
354.44(b)(2) 10727.2(d)(3) • Overdraft mitigation projects and management actions Sections 4.2
and 4.3.
Section 4.2.2.
Redlands Regular Meeting of 01-18-2022 Page 688 of 1274
GSP Section(s) or Water Code Regulations Requirement Description Page Number(s) Section Section in the GSP Article 8. Interagency Agreements
357.4 10727.6 Coordination
Agreements - Shall
be submitted to the
Department
together with the
GSPs for the basin
and, if approved,
shall become part of
the GSP for each
participating
Agency.
Coordination Agreements shall describe the following:
• A point of contact
• Responsibilities of each Agency
• Procedures for the timely exchange of information
between Agencies
• Procedures for resolving conflicts between Agencies
• How the Agencies have used the same data and
methodologies to coordinate GSPs
• How the GSPs implemented together satisfy the
requirements of SGMA
• Process for submitting all Plans, Plan amendments,
supporting information, all monitoring data and other
pertinent information, along with annual reports and
periodic evaluations
• A coordinated data management system for the basin
• Coordination agreements shall identify adjudicated areas within the basin, and any local agencies that have adopted an Alternative that has been accepted by the Department NA
Redlands Regular Meeting of 01-18-2022 Page 689 of 1274 Redlands Regular Meeting of 01-18-2022 Page 690 of 1274 Appendix 1-B
Yucaipa GSA Governance Documents
Redlands Regular Meeting of 01-18-2022 Page 691 of 1274 Redlands Regular Meeting of 01-18-2022 Page 692 of 1274
MEMORANDUM OF AGREEMENT TO FORM A
GROUNDWATER SUSTAINABILITY AGENCY
FOR THE YUCAIPA SUB-BASIN
(Sub-basin No. 8-02.07)
This 2017 Memorandum of Agreement ("MOA") is entered into by and among: South Mesa Water Company ("SOUTH MESA"), South Mountain Water Company ("SOUTH MOUNTAIN"), Western Heights Water Company ("WESTERN HEIGHTS") and Yucaipa Valley Water District ("YVWD"), herein collectively referred to as the "WATER PURVEYORS"; and, the City of Calimesa ("CALIMESA"), the City of Redlands ("REDLANDS") and the City of Yucaipa ("YUCAIPA"), herein collectively referred to as the "MUNICIPALITIES"; and, the San Bernardino Valley Municipal Water District ("SAN BERNARDINO VALLEY MUNICIPAL") and the San Gorgonio Pass Water Agency ("SAN GORGONIO"), herein collectively referred to as the "REGIONALS." The MUNICIPALITIES are sometimes herein collectively referred to as the "LAND USE AGENCIES." Each of the above-described entities is individually referred to as a "Party" and are collectively referred to as the "Parties". For purposes of this MOA, SOUTH MESA, SOUTH MOUNTAIN and WESTERN HEIGHTS are collectively referred to as the "MUTUALS"; and, the Parties other than the MUTUALS are collectively referred to as the "LOCAL AGENCIES."
Pursuant to the Sustainable Groundwater Management Act ("SGMA") and as further set forth herein, the purpose of this MOA is to form a Groundwater Sustainability Agency ("GSA") for the entire Yucaipa Sub-basin (Basin or Sub-Basin No. 8-02.07), in order to preserve local management and control of the Basin as set forth under SGMA.
The County of Riverside ("RIVERSIDE") and the County of San Bernardino ("SAN BERNARDINO"), collectively "COUNTIES," shall be considered "Stakeholders" but not Parties to this MOA.
Recitals
WHEREAS, on September 16, 2014, Governor Jerry Brown signed into law Senate Bills 1168 and 1319, and Assembly Bill 1739, collectively known as the Sustainable Groundwater Management Act ("SGMA"), codified in certain provisions of the California Government Code, including commencing with Section 65350.5, and codified in Part 2.74 of Division 6 of the California Water Code, commencing with Section 10720, and amending other provisions of the California Government Code and California Water Code; and WHEREAS, SGMA went into effect on January 1, 2015; and, WHEREAS, various clarifying amendments to SGMA were signed into law in 2015, including Senate Bills 13 and 226, and Assembly Bills 617 and 939, which were codified in part in California Water Code Section 10723.6(a), authorizing a combination of local agencies to form a GSA pursuant to a joint powers agreement, a memorandum of agreement, or other legal agreement; and, California Water Code Section 10723.6(b), authorizing water corporations regulated by the California Public Utilities Commission and mutual water companies to participate in a GSA through a memorandum of agreement or other legal agreement; and 2017 Yucaipa Sub-basin MOA Page 1 of 21
S801-013--3088672.l
Redlands Regular Meeting of 01-18-2022 Page 693 of 1274 WHEREAS, the legislative intent and effect of SGMA, as set forth in California Water Code Section 10720.1, includes the following: (1) to provide for the sustainable management of groundwater basins; (2) to enhance local management of groundwater consistent with rights to use or store groundwater and Section 2 of Article X of the California Constitution, and to preserve the security of water rights in the state to the greatest extent possible consistent with the sustainable management of groundwater; (3) to establish minimum standards for sustainable groundwater management; (4) to provide local groundwater agencies with the authority and the technical and financial assistance necessary to sustainably manage groundwater; (5) to avoid or minimize subsidence; (6) to improve data collection and understanding about groundwater; (7) to increase groundwater storage and remove impediments to recharge; (8) to manage groundwater basins through the actions of local governmental agencies to the greatest extent feasible, while minimizing state intervention to only when necessary to ensure that local agencies manage groundwater in a sustainable manner; and (9) to provide a more efficient and cost-effective groundwater adjudication process that protects water rights, ensures due process, prevents unnecessary delay, and furthers the objectives of SGMA; and,
WHEREAS, SGMA affords GSAs specific powers to manage groundwater in addition to existing legal authorities, which powers may be used to provide the maximum degree of local control and flexibility consistent with the sustainability goals of SGMA; and, WHEREAS, SGMA includes several un-codified findings by the California Legislature, including the determination that the people of the state have a primary interest in the protection, management, and reasonable beneficial use of the water resources of the state, both surface and underground, and that the integrated management of the state's water resources is essential to meeting its water management goals; and,
WHEREAS, the Basin, as depicted in Exhibit A to this MOA, is identified by the California Department of Water Resources Bulletin 118 as Sub-basin No. 8-02.07 of the Upper Santa Ana Valley Groundwater Basin, and is designated by DWR as medium-priority; and, WHEREAS, California Water Code Section 10720.7 requires the Basin, as a medium-priority basin that is not designated by DWR as being subject to critical conditions of overdraft, to be managed by a Groundwater Sustainability Plan ("GSP") or coordinated GSPs by January 31, 2022; and,
WHEREAS, in order to avoid designation as a probationary basin and become subject to direct intervention and management by the State Water Board, California Water Code Section 10735.2 requires that, by June 30, 2017 a collection of local agencies must form a GSA or prepare agreements to develop one or more GSPs that will collectively serve as a GSP for the entire Basin, in the event that a local agency has not decided to become a GSA that intends to develop a GSP for the entire Basin; and,
WHEREAS, the LOCAL AGENCIES have water supply, water management, and/or land use responsibilities for their respective jurisdictional areas overlying the Basin and are local agencies as defined by SGMA in California Water Code Section 10721 (n), and thus each is authorized by SGMA to become or form a GSA; and,
WHEREAS, the LOCAL AGENCIES' individually have jurisdictional and/or service areas within and their collective jurisdictional areas and/or service areas cover the entirety of the Basin, with no gaps in coverage; and,
2017 Yucaipa Sub-basin MOA Page 2 of 21
S801-0!3 -- 3088672.1
Redlands Regular Meeting of 01-18-2022 Page 694 of 1274 WHEREAS, the WATER PURVEYORS, including the MUTUALS, produce groundwater and provide water service within the Basin, and it is the Parties' shared intent to provide for management-level participation by the MUTUALS in the GSA to the maximum extent allowed by law without limiting any powers afforded to a GSA under SGMA; and, WHEREAS, the REGIONALS are State Water Contractors, and have the rights and duties of such, including for the delivery of State Water Project Water within the Basin; and, WHEREAS, in accordance with the terms of this MOA, and in furtherance of the shared intent of the Parties to maximize funding opportunities for the Basin and avoid potential intervention in the Basin by the State Water Board, the Parties agree that the YUCAIPA-GSA formed by this MOA will cover the entire Basin; and,
WHEREAS, the Parties mutually desire and intend to work with local stakeholders and interested parties in the Basin that are not Parties to this MOA, to carry out the policy, purposes, and requirements of SGMA in the Basin.
Agreement
NOW, THEREFORE, in consideration of the promises, terms, conditions, and covenants contained herein, it is mutually understood and agreed as follows:
I. Incorporation of Recitals. The Recitals stated above are incorporated herein by reference.
II. Purposes. The purposes of this MOA is to form the YUCAIPA-GSA for the Basin as specified herein pursuant to applicable provisions and requirements of SGMA, including but not limited to California Water Code Sections 10723 and 10723.6.
Ill. Approval of MOA and Formation of the YUCAIPA-GSA. Approval of this MOA and formation of the YUCAIPA-GSA shall be accomplished by the LOCAL AGENCIES each holding its own noticed public hearing pursuant to California Water Code Section 10723(b) and California Government Code Section 6066 and at such hearing will consider approval of a Resolution by its governing board to enter this MOA and jointly form the YUCAIPA-GSA as specified in this MOA. Approval of this MOA by the MUTUALS shall be accomplished through their respective governing boards' duly authorized procedures.
IV. Definitions. The following terms, whether used in the singular or plural, and when used with initial capitalization, shall have the meanings specified herein. The Parties agree that any definitions set forth herein are intended to be consistent with SGMA, and in the event of any discrepancy between a defined term in this MOA and a defined term in SGMA, the terms of SGMA shall control.
A. "Basin" refers to the Yucaipa Sub-basin, designated by the California Department of Water Resources Bulletin 118 as Sub-basin No. 8-02.07, as depicted in Exhibit A to this MOA.
B. "DWR" means the California Department of Water Resources. 2017 Yucaipa Sub-basin MOA Page 3 of 21
SSOl-013 --3088672.1
Redlands Regular Meeting of 01-18-2022 Page 695 of 1274 C. "GSA" means a Groundwater Sustainability Agency, as defined by SGMA.
D. "GSP" means a Groundwater Sustainability Plan, as defined by SGMA.
E. "Memorandum of Agreement" or "MOA" refers to this Memorandum of Agreement.
F. "SGMA" refers to the Sustainable Groundwater Management Act, of 2014, as amended.
G. "State Water Board" means the California State Water Resources Control Board.
H. "YUCAIPA-GSA" refers to the Yucaipa Sub-basin GSA formed under this MOA.
V. Coordination and Cooperation
A Continued Cooperation. The Parties to this MOA will continue to meet, confer, coordinate, and collaborate to discuss and develop technical, managerial, financial, and other criteria and procedures for the preparation, governance, and implementation of a GSP or coordinated GSPs in the Basin and to carry out the policy, purposes, and requirements of SGMA in the Basin.
B. Points of Contact. Each Party shall designate a principal contact person for that Party, who may be changed from time to time at the sole discretion of the designating Party. The principal contact person for each Party shall be responsible for coordinating with the principal contact persons for the other Parties in scheduling meetings and other activities under this MOA.
C. Voting Methodology. The voting structure for matters pertaining to the establishment and implementation of the administrative components of the YUCAIPA-GSA shall be by simple majority (51 %) of the voting Parties, wherein each WATER PURVEYOR, MUNICIPALITY and REGIONAL holds a single vote.
VI. Roles and Responsibilities
A The YUCAIPA-GSA shall be controlled by a Governing Board comprised of one representative of each of the Parties to this MOA.
B. The Parties agree to jointly establish their specific roles and responsibilities for implementing this MOA, including through the adoption of organizational documents, management policies, rules and procedures.
C. The Parties agree to jointly develop and implement a GSP or coordinated GSPs for the Basin in accordance with SGMA.
D. The Parties agree to work in good faith and coordinate all activities to carry out the purposes of this MOA in implementing the policy, purposes, and requirements of SGMA in the Basin, including continuing to meet, confer, coordinate, and collaborate to discuss and develop governance, management, technical, financial, and other matters, including respective roles and responsibilities for activities such as, but not limited to, the following: modeling; 2017 Yucaipa Sub-basin MOA Page 4 of 21
S801-0l 3 -- 3088672.1
Redlands Regular Meeting of 01-18-2022 Page 696 of 1274 metering; monitoring; hiring consultants; developing and maintaining list of interested persons under California Water Code Section 10723.4; budgeting; and other initial tasks as determined by the Parties.
E. The LOCAL AGENCIES shall coordinate with each other to cause all applicable noticing and submission of required information to DWR regarding formation of the YUCAIPA-GSA.
VII. Funding and Budgeting. The Parties shall work together to identify the costs, funding needs and funding sources for the administration of the YUCAIPA-GSA and the development and implementation of the GSP. To the extent not otherwise funded in accordance with or inconsistent with SGMA's provisions regarding GSA funding, the PURVEYORS shall collectively bear seventy-five percent (75%) and the MUNICIPALITIES and REGIONALS shall collectively bear twenty-five percent (25%) of the cost of the creation and administration of the YUCAIPA-GSA; and within each group, the Parties shall equally share in the costs of the creation and administration of the YUCAIPA-GSA. Nothing in this provision shall obligate any party to bear any portion of the attorneys' fees and legal costs of another Party.
VIII. Stakeholders. The initially designated stakeholders are the COUNTIES. The Parties agree to work together in ensuring public outreach and involvement of the public and other interested stakeholders throughout the SGMA process, including but not limited to all beneficial uses and users of groundwater as provided in SGMA Section 10723.2.
Stakeholders have no voting rights under Section V.C. and no cost sharing obligations under Section VI I of this MOA.
IX. Term, Termination, and Withdrawal.
A Term. This MOA shall continue and remain in effect unless and until terminated by the unanimous written consent of the Parties, or as otherwise provided in this MOA or as authorized by law.
B. Withdrawal. After the YUCAIPA-GSA is officially established as the GSA for the Basin, any Party may decide, in its sole discretion, to withdraw from this MOA by providing ninety (90) days written notice to the other Parties. A Party that withdraws from this MOA shall remain obligated to pay its share of costs and expenses incurred or accrued under this MOA and any related cost-sharing agreement or arrangement up to the date the Party provides its notice of withdrawal as provided herein. Withdrawal by a Party shall not cause or require the termination of this MOA or the existence of the YUCAIPA-GSA with respect to the non-withdrawing Parties. In the event of withdrawal by one of the LOCAL AGENCIES, the Parties shall meet and confer during the 90-day notice period regarding: (i) whether the withdrawing Party wishes to seek GSA status for a portion of the Basin underlying the jurisdictional area or service area of the withdrawing Party; (ii) whether, as a result of the withdrawal, a co-GSA management or other arrangement with the withdrawing Party is necessary to satisfy the requirements of SGMA; and (iii) any other issues and steps that are necessary to avoid triggering probationary status of the Basin and State Water Board intervention. Any resolution of issues pertaining to withdrawal and any 2017 Yucaipa Sub-basin MOA Page 5 of 21
SSOl-013--3088672.1
Redlands Regular Meeting of 01-18-2022 Page 697 of 1274 other GSA issues shall be undertaken in a manner that satisfies all requirements of SGMA and DWR, including any requirement to file new GSA notices.
X. Notice Provisions
All notices required by this MOA shall be made in writing and delivered to the respective representatives of the Parties at their respective addresses as follows:
PARTIES:
PURVEYORS:
South Mesa Water Company
391 West Avenue L
Calimesa, California 92320
Attn: Dave Armstrong, General Manager
Email: [email protected]
South Mountain Water Company
35 Cajon Street
Redlands, California 92373
Attn: Cecilia Griego, Water Resources Specialist
Email: [email protected]
Western Heights Water Company
32352 Avenue D
Yucaipa, California 92399
Attn: William Brown, General Manager
Email: [email protected]
Yucaipa Valley Water District
12770 Second Street
Yucaipa, California 92399
Attn: Joseph, Zoba, General Manager
Email: [email protected]
MUNICIPALS:
City of Calimesa
908 Park Avenue
Calimesa, California 92399
Attn: Bonnie Johnson, City Manager
Email: [email protected]
City of Redlands
35 Cajon Street
Redlands, California 92373
Attn: Chris Diggs, Municipal Utilities and Engineering Director Email: [email protected]
2017 Yucaipa Sub-basin MOA Page 6 of 21
SSOl-013--3088672.1
Redlands Regular Meeting of 01-18-2022 Page 698 of 1274 REGIONALS:
City of Yucaipa
34272 Yucaipa Boulevard
Yucaipa, California 92399
Attn: Ray Casey, City Manager
Email: [email protected]
San Bernardino Valley Municipal Water District
380 E. Vanderbilt Way
San Bernardino, CA 92408
Attn: Douglas Headrick, General Manager & Chief Engineer Email: [email protected]
San Gorgonio Pass Water Agency
1210 Beaumont Avenue
Beaumont, CA 92223
Attn: Jeff Davis, General Manager and Chief Engineer
Email: [email protected]
STAKEHOLDERS:
COUNTIES:
County of Riverside
4080 Lemon Street
Riverside, CA 92501
Attn: Steve Horn, Senior Management Analyst, Executive Office Email: [email protected]
County of San Bernardino
385 N. Arrowhead Avenue
San Bernardino, CA 92415-0120
Attn: Bob Page, Principal Management Analyst, Special Projects Email: [email protected]
Any Party or Stakeholder may change the address to which notices are to be given under this MOA by providing all other Parties with written notice of such change at least fifteen (15) calendar days prior to the effective date of the change. All notices shall be effective upon receipt and shall be deemed received upon confirmed personal service, confirmed facsimile delivery, confirmed courier service, or on the fifth (51h) calendar day following deposit of the notice in registered first class mail.
XI. General Terms
A. Amendments. Amendments to this MOA require the unanimous written consent of all Parties and approval by the Parties' respective governing boards.
B. Successors and Assigns. The terms of this MOA shall be binding upon and inure to the benefit of the successors-in-interest and assigns of each Party; provided, however, that no transfer or assignment shall be effective until approved by the 2017 Yucaipa Sub-basin MOA Page 7 of 21
S80!-013 -- 3088672.2
Redlands Regular Meeting of 01-18-2022 Page 699 of 1274 Parties in accordance with the provisions of Section V.C. of this MOA. Once succession and/or assignment has been approved, a former Party shall have no further rights or obligations under this MOA.
C. Waiver. No waiver of any provision of this MOA by any Party shall be construed as a further or continuing waiver of such provision or any other provision of this MOA by the waiving Party or any other Party.
D. Authorized Representatives. Each person executing this MOA on behalf of a Party hereto affirmatively represents that such person has the requisite authority to sign this MOA on behalf of the respective Party.
E. Exemption from CEQA. The Parties recognize and agree that, pursuant to SGMA Section 10728.6, neither this MOA nor the preparation or adoption of a GSP constitute a "project" or approval of a project under the California Environmental Quality Act (CEQA) or the State CEQA Guidelines, and therefore this MOA is expressly exempt from CEQA review.
F. Governing Law and Venue. This MOA shall be governed by and construed in accordance with the laws of the State of California. Any suit, action, or proceeding brought under the scope of this MOA shall be brought and maintained to the extent allowed by law in the County of San Bernardino, California.
G. Attorney's Fees, Costs, and Expenses. In the event of a dispute among any or all of the Parties arising under this MOA, each Party shall assume and be responsible for its own attorney's fees, costs, and expenses.
H. Entire Agreement/Integration. This MOA constitutes the entire agreement among the Parties regarding the specific provisions of this MOA, and the Parties hereto have made no agreements, representations or warranties relating to the specific provisions of this MOA that are not set forth herein.
I. Construction and Interpretation. The Parties agree and acknowledge that this MOA has been developed through a negotiated process among the Parties, and that each Party has had a full and fair opportunity to review the terms of this MOA with the advice of its own legal counsel and to revise the terms of this MOA, such that each Party constitutes a drafting Party to this MOA.
Consequently, the Parties understand and agree that no rule of construction shall be applied to resolve any ambiguities against any particular Party as the drafting Party in construing or interpreting this MOA.
J. Force Majeure. No Party shall be liable for the consequences of any unforeseeable force majeure event that ( 1) is beyond its reasonable control, (2) is not caused by the fault or negligence of such Party, (3) causes such Party to be unable to perform its obligations under this MOA, and (4) cannot be overcome by the exercise of due diligence. In the event of the occurrence of a force majeure event, the Party unable to perform shall promptly notify the other Parties in writing to the extent practicable. It shall further pursue its best efforts to resume its obligations under this MOA as quickly as possible and shall suspend performance only for such period of time as is necessary as a result of the force majeure event.
2017 Yucaipa Sub-basin MOA Page 8 of 21
SSOI-013-- 3088672.2
Redlands Regular Meeting of 01-18-2022 Page 700 of 1274 K. Execution in Counterparts. This MOA may be executed in counterparts, each of which shall be deemed an original and all of which when taken together shall constitute one and the same instrument.
L. No Third Party Beneficiaries. This MOA is not intended, and will not be construed, to confer a benefit or create any right on a third party or the power or right of any third party to bring an action to enforce any of the terms of this MOA.
M. Timing and Captions. Any provision of this MOA referencing a time, number of days, or period for performance shall be measured in calendar days. The captions of the various articles, sections, and paragraphs of this MOA are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, terms, or intent of this MOA.
IN WITNESS WHEREOF, the Parties hereto have approved and executed this MOA as of the respective dates specified in the adopting Resolution of each Party as provided above in Article Ill of this MOA.
[Signature Pages Follow]
2017 Yucaipa Sub-basin MOA Page 9 of 21
S80!-0!3 --3088672.1
Redlands Regular Meeting of 01-18-2022 Page 701 of 1274
COUNTY OF RIVERSIDE
EXE;CUTIVE OFFICE
GEORGE A. JOHNSON COUNTY EXECUTlVE OFFICER
June 22, 2017
Mr. Douglas Headrick
General Manager and Chief Engineer
San Bernardino Valley Municipal Water
District 380 E. Vanderbilt Way
San Bernardino, CA 92408
re: Support for Yucaipa Sub-Basin GSA
Mr. Headrick:
ROB FIELD ASSlST,6,NT COUtolTY EXECIJTlVE OFTICER
ECONOMIC DEVELOPMENT AGENCY
MICHAEL T. STOCK ASSISTANT COUNTY EXECllTIVE OFFICER
HUMAN RESOURCES
ZAREH SARRAFIAN ASSISTANT COUNTY EXECUTIVE OFFICER
HEAL l1i SYSTEMS
PAUL McDONNELL ASSISTANTCOUNTY EXECl.ITlVEOFFICER
COUNlY Fl NANCE DIRECTOR
The County of Riverside appreciates the commitment of the cities of Calimesa, Redlands and Yucaipa; San Bernardino Valley Municipal Water District; San Gorgonio Pass Water Agency; Yucaipa Valley Water District; South Mesa Water Company; South Mountain Water Company; and Western Heights Water Company to maintain local control of the Yucaipa Sub-Basin and to work together through a Memorandum of Agreement to sustainably manage the basin's groundwater resources in a way that considers the interests of all beneficial uses and users.
As the County is also eligible to serve as the Groundwater Sustainability Agency for the Yucaipa SubBasin, the County wishes to assure you that it does not intend to adopt a competing Groundwater Sustainability Agency formation resolution and notification of the California Department of Water Resources.
If you should have any questions, please contact me at 951-955-1110 or by email at [email protected].
Alex Gann
4~ Deputy County Executive Officer
ec: Steve Van Stockum, Director, Riverside County Department of Environmental Health Jeff Johnson, Deputy Director, Riverside County Department of Environmental Health Jason Uhley, General Manager-Chief Engineer, Riverside County Flood Control And Water Conservation District
ROBERT T. ANDERSEN COUNTY ADMINISTRATIVE CENTER
4080 LEMON STREET• FOURTH FLOOR• RIVERSIDE, CALIFORNIA92501•(951)955-1110 •FAX (951) 955-1034 Redlands Regular Meeting of 01-18-2022 Page 702 of 1274 385 N. Arrowhead Avenue, 5th Floor, San Bernardino, CA 92415 I Phone: 909.387.4830 Fax: 909 .387.3029 Board of Supervisors SAN BERNARDINO
COUNTY
May 23, 2017
Mr. Douglas Headrick
General Manager and Chief Engineer
San Bernardino Valley Municipal Water District
380 E. Vanderbilt Way
San Bernardino, CA 92408
Re : Support for Yucaipa Sub-Basin Groundwater Sustainability Agency Mr. Headrick:
On May 23, 2017, the County of San Bernardino Board of Supervisors voted to communicate the County's support of the cooperative efforts of the Yucaipa Sub-Basin Groundwater Sustainability Agency to manage groundwater in the Yucaipa Sub-Basin (No. 8-2.07) in compliance with the California Sustainable Groundwater Management Act.
The County appreciates the commitment of the cities of Calimesa, Redlands and Yucaipa; San Bernardino Valley Municipal Water District; San Gorgonio Pass Water Agency; Yucaipa Valley Water District; South Mesa Water Company; South Mountain Water Company; and Western Heights Water Company to maintain local control of the Yucaipa Sub-Basin and to work together through a Memorandum of Agreement to sustainably manage the basin's groundwater resources in a way that considers the interests of all beneficial uses and users.
As the County is also eligible to serve as the Groundwater Sustainability Agency for the Yucaipa Sub-Basin, the County wishes to assure you that the County does not intend to adopt a competing Groundwater Sustainability Agency formation resolution and notification of the California Department of Water Resources. To that end, on March 7, 2017, the Board of Supervisors adopted a resolution that the County would not be the Groundwater Sustainability Agency for 11 groundwater basins and sub-basins in the county, including Yucaipa Sub-Basin. A copy of this resolution is attached .
If you shou ld have any questions, please contact Bob Page, Principal Management Analyst, at {909) 387-4384 or by email at [email protected]. Thank you .
Sincerely,
Robert A. Lovingood
Chairman and First District Supervisor
Board of Supervisors
County of San Bernardino
BOARD OF SUPERVISORS
ROBERT A. LOVINGOOD JANICE RUTHERFORD }AMES RAMOS CURT HAGMAN JOSIE GONZALES Chairman , First District Second Dlsmct Third Distnct \'Ice Chairman, Fourth District Fifth Dlstnct · J · - .n. ·;;.
Redlands Regular Meeting of 01-18-2022 Page 703 of 1274 Rev 7~12·16
FROM:
REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS
OF SAN BERNARDINO COUNTY, CALIFORNIA
AND RECORD OF ACTION
May 23, 2017
DENA M. SMITH, Interim Chief Executive Officer
County Administrative Office
SUBJECT: SUPPORT FOR BEAR VALLEY BASIN AND YUCAIPA BASIN
GROUNDWATER SUSTAINABILITY AGENCIES
RECOMMENDATION($)
1. Approve and authorize submission of letters of support for the cooperative efforts of cities, water districts and water companies to manage groundwater in compliance with the California Sustainable Groundwater Management Act in the following groundwater basins:
a. Bear Valley Basin (No. 8-9)
b. Yucaipa Sub Basin (No. 8-2.07)
2. Authorize the Chairman of the Board of Supervisors or the Chief Executive Officer to execute similar letters of support, subject to review by County Counsel, for local agency efforts to manage other groundwater basins in San Bernardino County that must comply with the California Sustainable Groundwater Management Act for which the County has previously notified the California Department of Water Resources that the County will not serve as the Groundwater Sustainability Agency.
(Presenter: Bob Page, Principal Management Analyst, 387-5425)
COUNTY AND CHIEF EXECUTIVE OFFICER GOALS AND OBJECTIVES Ensure Development of a Well-Planned, Balanced, and Sustainable County.
Pursue County Goals and Objectives by Working with Other Agencies.
FINANCIAL IMPACT
Providing letters of support to local agencies forming Groundwater Sustainability Agencies (GSAs) will not result in the use of additional Discretionary General Funding (Net County Cost).
BACKGROUND INFORMATION
Effective January 1, 2015, the California Sustainable Groundwater Management Act (SGMA) requires local water and land use agencies to sustainably manage 127 groundwater basins and sub-basins (basins) that have been designated by the California Department of Water Resources (DWR) as medium or high priority. SGMA mandates that one eligible local agency or multiple eligible local agencies form a GSA for each of these basins by June 30, 2017 with the responsibility of developing and implementing a Groundwater Sustainability Plan (GSP). cc: CAO-Smith
CAO-Page w/Letters of Support
CAO-Shea
File - Administrative Office w/copy
of Letters
jr 5/24/17
ITEM 55
MOTION
LAURA H. ""'-- ~' "'"'
AYE
5 BY ~~~~~t%~~~~'1Q"'T- ~~~
Redlands Regular Meeting of 01-18-2022 Page 704 of 1274
SUPPORT FOR BEAR VALLEY BASIN AND YUCAIPA BASIN
GROUNDWATER SUSTAINABILITY AGENCIES
MAY 23, 2017
PAGE 2 OF 3
DWR has designated Bear Valley Basin as medium priority. DWR has also defined the boundaries of the Bear Valley Basin in its Bulletin 118 and assigned it No. 8-9. The City of Big Bear Lake, the Big Bear City Community Services District and the Big Bear Municipal Water District have formed the Bear Valley Basin Groundwater Sustainability Agency (Bear Valley Basin GSA), a joint powers authority that became effective on April 26, 2017, with the purpose to become the exclusive GSA for the Bear Valley Basin.
DWR has designated Yucaipa Sub-Basin as medium priority. DWR has also defined the boundaries of the Yucaipa Sub-Basin in its Bulletin 118 and assigned it No. 8-2.07. Negotiations of a Memorandum of Agreement (MOA) regarding the formation of a GSA for the Yucaipa SubBasin completed in April. The MOA was circulated for approval by June from the governing bodies of the following parties to the MOA: the cities of Calimesa, Redlands and Yucaipa; San Bernardino Valley Municipal Water District; San Gorgonio Pass Water Agency; Yucaipa Valley Water District; South Mesa Water Company; South Mountain Water Company; and Western Heights Water Company.
Before either GSA can be the exclusive GSA for their respective basin, SGMA requires that they hold a noticed public hearing to adopt a resolution to become the exclusive GSA The Bear Valley Basin GSA hearing is scheduled for May 25, 2017. The parties to Yucaipa Sub-Basin GSA MOA will hold separate public hearings on various dates before June 30, 2017. The GSAs will then have 30 days to notify DWR of their decisions, providing among other things a map of the service areas of the parties within each basin (attached) and a list of all beneficial uses and users of the groundwater and how their interests will be considered in the operation of the GSAs and the development and implementation of their GSPs.
DWR will post the notices on its SGMA Portal on its website (sgma.water.ca.gov/portal/#intro).
Other eligible local agencies in each basin, including the County, will then have 90 days to file a competing GSA notice. If no competing notices are filed with DWR, the Bear Valley Basin GSA and Yucaipa Sub-Basin GSA will become the exclusive GSAs for their basins. On March 7, 2017 (Item No. 20), the Board of Supervisors (Board) adopted a resolution that the County would not be the GSA for 11 groundwater basins and sub-basins in the county, including Bear Valley Basin and Yucaipa Sub-Basin. The Board adopted a simitar resolution covering five other basins on January 10, 2017 {Item No. 21).
The parties to these GSAs requested that the County support their efforts. If approved by the Board, the recommended letters will be provided to the Bear Valley Basin GSA and Yucaipa SubBasin GSA.
If local agencies in any of the other 14 basins covered by the Board's January 10 and March 7 resolutions request support of their GSA, approval of Recommendation No. 2 will authorize the Chairman of the Board or the Chief Executive Officer to execute similar letters of support, subject to review by County Counsel.
5/23/17 #55
Redlands Regular Meeting of 01-18-2022 Page 705 of 1274
SUPPORT FOR BEAR VALLEY BASIN AND YUCAIPA BASIN
GROUNDWATER SUSTAINABILITY AGENCIES
MAY 23, 2017
PAGE 3 OF 3
PROCUREMENT
N/A.
REVIEW BY OTHERS
This item has been reviewed by County Counsel (Sophie A. Akins, Deputy County Counsel, 387- 5001) on May 5, 2017; Finance (Stephenie Shea, Administrative Analyst, 387-4919) on May 8, 2017; and County Finance and Administration (Katrina Turturro, Deputy Executive Officer, 387- 5423) on May 8, 2017.
5/23/17 #55
Redlands Regular Meeting of 01-18-2022 Page 706 of 1274 Exhibit A
2017 Yucaipa Sub-basin MOA Page 21 of 21
S801-0l3 -- 3088672. l
Redlands Regular Meeting of 01-18-2022 Page 707 of 1274 RESOLUTION NO. 2017-18
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
YUCAIPA, CALIFORNIA, APPROVING THE MEMORANDUM
OF AGREEMENT TO FORM A GROUNDWATER
SUSTAINABILITY AGENCY FOR THE YUCAIPA SUB-BASIN
WITH THE CITIES OF CALIMESA AND REDLANDS; THE
SOUTH MESA WATER COMPANY; THE SOUTH MOUNTAIN
WATER COMPANY; THE WESTERN HEIGHTS WATER
COMPANY; THE YUCAIPA VALLEY WATER DISTRICT; THE
SAN BERNARDINO VALLEY MUNICIPAL WATER DISTRICT;
AND THE SAN GORGONIO PASS WATER AGENCY
WHEREAS, on September 16, 2014, Governor Jerry Brown signed into law Senate Bills 1168 and 1319, and Assembly Bill 1739, collectively known as the Sustainable Groundwater Management Act ("SGMA"), codified in certain provisions of the California Government Code, including commencing with Section 65350.5, and codified in Part 2.74 of Division 6 of the California Water Code, commencing with Section 10720, and amending other provisions of the California Government Code and California Water Code; and WHEREAS, various clarifying amendments to SGMA were signed into law in 2015, including Senate Bills 13 and 226, and Assembly Bills 617 and 939, which were codified in part in California Water Code Section 10723.6(a), authorizing a combination of local agencies to form a Groundwater Sustainability Agency (GSA) pursuant to a joint powers agreement, a memorandum of agreement, or other legal agreement; and, California Water Code Section 10723.6(b), authorizing water corporations regulated by the California Public Utilities Commission and mutual water companies to participate in a GSA through a memorandum of agreement or other legal agreement; and
WHEREAS, the Yucaipa Sub-Basin (Basin) is identified by the California Department of Water Resources (DWR) Bulletin 118 as Sub-Basin No. 8-02.07 of the Upper Santa Ana Valley Groundwater Basin, and is designated by DWR as a medium priority basin; and WHEREAS, California Water Code Section 10720.7 requires the Basin, as a medium priority basin that is not designated by DWR as being subject to critical conditions of overdraft, to be managed by Groundwater Sustainability Plan by January 31, 2022; and WHEREAS, the Cities of Yucaipa, Calimesa and Redlands; the Yucaipa Valley Water District; the South Mountain Water Company; the San Bernardino Valley Municipal Water District; and the San Gorgonio Pass Water Agency have water supply, water management, and/or land use responsibilities for their respective jurisdictional areas overlying the Basin and are local agencies as defined by SGMA, and thus each is authorized by SGMA to become or form a GSA; and
Redlands Regular Meeting of 01-18-2022 Page 708 of 1274 WHEREAS, the South Mesa Water Company and the Western Heights Water Company produce groundwater and provide water service within the Basin, and it is the intent to provide for management-level participation by these Water Companies in the GSA WHEREAS, the City held a public hearing on May 22, 2017, after publication of notice pursuant to Government Code Section 6066 to consider adoption of this Resolution; and WHEREAS, adoption of this Resolution does not constitute a "Project" under the California Environmental Quality Act (CEQA) pursuant to 15060(c)(3) and 15378(b)(5) of the State CEQA Guidelines because it is an administrative action that does not result in any direct or indirect physical change in the environment.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF YUCAIPA DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Adopt Resolution No. 2017-18 approving the Memorandum of Agreement to form a Groundwater Sustainability Agency for the Yucaipa sub-basin with the Cities of Calimesa and Redlands; the South Mesa Water Company; the South Mountain Water Company; the Western Heights Water Company; the Yucaipa Valley Water District; the San Bernardino Valley Municipal Water District; and the San Gorgonio Pass Water Agency.
PASSED, APPROVED, and ADOPTED this 22nd day of May, 2017.
DICK RIDDELL, MAYOR
ATTEST:
Redlands Regular Meeting of 01-18-2022 Page 709 of 1274 RESOLUTION 2017 - 09
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE SAN GORGONIO PASS WATER AGENCY TO APPROVE THE
MEMORANDUM OF AGREEMENT TO JOINTLY FORM THE YUCAIPA
GROUNDWATER SUSTAINABILITY AGENCY FOR THE YUCAIPA
SUBBASIN
WHEREAS, the Sustainable Groundwater Management Act of2014 (SGMA) was signed into law on September 16, 2014, went into effect on January 1, 2015, and has been subject to various amendments; and
WHEREAS, SGMA provides for the sustainable management of groundwater basins at the local level through the formation of Groundwater Sustainability Agencies (GSAs) and through preparation and implementation of Groundwater Sustainability Plans (GSPs); and WHEREAS, the Yucaipa Subbasin (Basin) is identified by the California Department of Water Resources (DWR) Bulletin 118 as Subbasin No. 8-02.07 of the Upper Santa Ana Valley Groundwater Basin, and is designated by DWR as medium priority, and therefore, except as provided by SGMA, the Basin is subject to the requirements of SGMA; and
WHEREAS, the San Gorgonio Pass Water Agency (Agency) is a special act agency of the State of California, organized and operating pursuant to the San Gorgonio Pass Water Agency Law, California Water Code Appendix, Chapter 101, and accordingly the Agency constitutes a local agency for all purposes under SGMA; and WHEREAS, SGMA authorizes a combination of local agencies as defined by SGMA to form a GSA pursuant to a joint powers agreement, a memorandum of agreement, or other legal agreement, and SGMA also authorizes a water corporation regulated by the California Public Utilities Commission or a mutual water company to participate in a GSA through a memorandum of agreement or other legal agreement; and
WHEREAS, in accordance with SGMA, the Agency, South Mesa Water Company (South Mesa), South Mountain Water Company (South Mountain), Western Heights Water Company (Western Heights), Yucaipa Valley Water District (YVWD), City of Calimesa (Calimesa), City of Redlands (Redlands), City of Yucaipa (Yucaipa), and San Bernardino Valley Municipal Water District (San Bernardino Valley Municipal) have prepared a Memorandum of Agreement (MOA), attached hereto as Exhibit A, to jointly form a GSA that is referred to in the MOA as the Yucaipa-GSA to cover the entire Basin, the members of which Yucaipa-GSA are the Agency, South Mesa, South Mountain, Western Heights, YVWD, Calimesa, Redlands, Yucaipa, and San Bernardino Valley Municipal; and WHEREAS, the Agency is committed to the sustainable management of groundwater resources within the Basin in accordance with SGMA; and WHEREAS, pursuant to the requirements of SGMA, the Agency held a public hearing on this date after publications of notice pursuant to California Government Code Section 6066 to consider adoption of this Resolution; and Redlands Regular Meeting of 01-18-2022 Page 710 of 1274 WHEREAS, pursuant to SGMA Section 10728.6 and Public Resources Code Section 21065, neither this Resolution, nor the MOA, nor the preparation or adoption of a GSP constitutes a project or approval of a project under the California Environmental Quality Act (CEQA) or the State CEQA Guidelines.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE SAN GORGONIO PASS WATER AGENCY THAT:
1. The San Gorgonio Pass Water Agency hereby approves the Memorandum of Agreement to Jointly Form the Yucaipa Groundwater Sustainability Agency for the Yucaipa Subbasin (MOA), a copy of which is attached hereto as Exhibit A.
2. Pursuant to the MOA and as authorized by SGMA, the San Gorgonio Pass Water Agency elects to jointly form and participate as a member of the Yucaipa Groundwater Sustainability Agency (Yucaipa-GSA) for the entire Basin as further set forth and depicted in the MOA.
3. The General Manager of the San Gorgonio Pass Water Agency is hereby authorized and directed to coordinate with other members of the Yucaipa-GSA to submit a copy of this Resolution and other applicable information to the California Department of Water Resources regarding the formation of the Yucaipa-GSA.
I HEREBY CERTIFY that the foregoing is a true, full and correct copy of Resolution 2017- 09 that was duly introduced, passed and adopted at a regular meeting of the Board of Directors of the San Gorgonio Pass Water Agency, at its regular meeting on June 5, 2017.
David L. Fenn, at
San Gorgonio Pass Water Agency
Redlands Regular Meeting of 01-18-2022 Page 711 of 1274 Approved on May 23, 2018
1 BYLAWS OF THE
YUCAIPA SUSTAINABLE GROUNDWATER MANAGEMENT AGENCY
(Department of Water Resources Sub-Basin No. 8-02.07)
ARTICLE I - NAME, ORGANIZATION, REPRESENTATIVES, PRINCIPAL OFFICE Section 1.1 Name. The name of this organization is the Yucaipa Sustainable Groundwater Management Agency (hereinafter referred to as the “Yucaipa-SGMA”).
Section 1.2 Organization. The Yucaipa-SGMA was formed by a Memorandum of Agreement (“MOA”) in 2017 which remains in full force and effect, by and among: South Mesa Water Company, South Mountain Water Company, Western Heights Water Company and Yucaipa Valley Water District, herein collectively referred to as the “Water Purveyors”; and the City of Calimesa, the City of Redlands, and the City of Yucaipa, herein collectively referred to as the “Municipalities”; and the San Bernardino Valley Municipal Water District, and the San Gorgonio Pass Water Agency, herein collectively referred to as the “Regionals.” Each of the abovedescribed entities is individually referred to as a “Party” and collectively referred to as the “Parties”.
Section 1.3 Board of Directors. Each Party shall appoint a principal representative and alternative representative, who may be changed from time to time at the sole discretion of the designating Party. The individuals appointed to the YucaipaSGMA shall be a senior executive management level employee of each designating Party. In the event that the appointed representative(s) is/are no longer employed by the appointing Party, the individual will be removed as a member of the Board of Directors of the Yucaipa-SGMA. Written confirmation from the governing board shall be provided to the Yucaipa-SGMA at the Principal Office following any change in representation.
Section 1.4 Principal Office. The principal office of the Corporation is hereby fixed and located at the offices of the San Bernardino Valley Municipal Water District, 380 East Redlands Regular Meeting of 01-18-2022 Page 712 of 1274 Approved on May 23, 2018
2 Vanderbilt Way, San Bernardino, California 92408. The Parties hereby granted full power and authority to change said principal office from one location to another.
Any such change shall be noted by the Secretary.
ARTICLE II - ROLES AND RESPONSIBILITIES
Section 2.1 Sustainable Groundwater Management Act. The Parties agree to jointly implement the Sustainable Groundwater Management Act (“SGMA”), codified in certain provisions of the California Government Code, including commencing with Section 65350.5, and codified in Part 2.74 of Division 6 of the California Water Code, commencing with Section 10720, and amending other provisions of the California Government Code and California Water Code.
Section 2.2 Groundwater Sustainability Plan. Specifically, the Parties agree to develop, implement, and maintain a Groundwater Sustainability Plan (“Plan”) prepared pursuant to the Sustainable Groundwater Management Act (Part 2.74 of Division 6 of the Water Code, beginning with Section 10720) for the Yucaipa Basin (Department of Water Resources Sub-Basin No. 8-02.07) (“Basin”), The following general principles shall guide the Parties in the implementation of a Groundwater Sustainability Plan: (a) Adopt a Plan that defines the basin setting and establishes criteria that will maintain or achieve sustainable groundwater management; (b) Monitor and report groundwater conditions to demonstrate that the Plan is achieving the sustainability goal for the basin; (c) Document the effect of the implementation of the Plan on adjacent basins; (d) Modify the Plan as needed, and report on a substantial compliance to the California Department of Water Resources; (e) Establish and report sustainable management criteria, projects, and management actions; and (f) Justify that the Plan provides a sustainably managed basin for 20 years following Plan implementation without adversely affecting the ability of an adjacent basin to achieve and maintain its sustainability goal.
Section 2.3 Powers and Duties. The Yucaipa-SGMA shall exercise the following powers:
Redlands Regular Meeting of 01-18-2022 Page 713 of 1274 Approved on May 23, 2018
3 A. To adopt rules, regulations, policies, bylaws and procedures governing the operation of the Yucaipa-SGMA.
B. To establish as-needed Ad Hoc and Standing advisory committees for making recommendations to the Board of Directors. Committees shall exist for the term specified in the action creating the committee, and the Board of Directors may dissolve a committee at any time through a majority vote of the Parties.
C. To monitor all public and private groundwater production and extractions.
D. To develop a Groundwater Sustainability Plan as described in Section 2.2.
E. To prepare an Annual Groundwater Report that reflects: all public and private groundwater extractions; natural and artificial recharge; return from use; water quality issues; contamination plumes; and other parameters deemed necessary by the Board of Directors to accurately determine the quantity and quality of the groundwater conditions in the Yucaipa Basin (Department of Water Resources Sub-Basin No. 8-02.07).
F. To determine the amount of additional artificial recharge for the Basin from imported sources as a complement to native sources, and to plan for the development and application of such additional sources of recharge.
G. By a majority vote, the Board of Directors may elect to exercise the following powers for a duration determined or modified as needed:
a. To contract for the services of engineers, attorneys, planners, financial consultants, and separate and apart therefrom, to appoint agents and representatives to employ such other staff persons as necessary.
b. To determine, assess, collect, account, and audit annual groundwater extraction charges to recover expenses related to groundwater recharge, administrative expenses, data collection, and report preparation as determined by the Board of Directors. c. To cooperate, act in conjunction, and contract with the United States, the State of California, or any agency thereof, counties, municipalities, public and private corporations of any kind (including without limitation, investor-owned utilities), and individuals, or any of them, for any and all purposes necessary or convenient for the purposes of the Yucaipa-SGMA.
Redlands Regular Meeting of 01-18-2022 Page 714 of 1274 Approved on May 23, 2018
4 d. To accumulate operating and reserve funds and invest the same as allowed by law for the purposes of the Yucaipa-SGMA.
e. As may be permitted by law, to apply for and accept grants, contributions, donations and loans, including under any federal, state or local programs for assistance in developing or implementing any of its projects or programs in connection with any project untaken by the Yucaipa-SGMA.
f. To implement a cost-sharing methodology in a manner that qualifies as a pass-through charge under the Constitutional requirements of Proposition 218 and similar revenue-raising requirements. g. To exercise any power necessary or incidental to the foregoing powers in the manner and according to the procedures provided for under the law applicable to the Parties to this Agreement.
ARTICLE III - MEETINGS
Section 3.1 Regular Meetings. The Parties shall hold regular quarterly meetings on the fourth Wednesday in January, April, July, October for the purpose of conducting routine business matters. The Parties by resolution may fix and adjust the time, date, and place of holding such meetings.
Section 3.2 Workshops and Special Meetings. The Parties may schedule, and conduct workshops and special meetings as needed at the direction of a majority of the Board of Directors. The Parties by resolution may fix the time, date, and place of holding such meetings.
Section 3.3 Voting Methodology. The voting structure for matters pertaining to the establishment and implementation of the administrative components of the Yucaipa-SGMA shall be by simple majority (51%) of the voting Parties, wherein each Water Purveyor, Municipality and Regional holds a single vote.
Section 3.4 Fees and Compensation. Representatives from each Party shall receive no compensation or expenses from the Yucaipa-SGMA.
Redlands Regular Meeting of 01-18-2022 Page 715 of 1274 Approved on May 23, 2018
5 Section 3.5 Ralph M. Brown Act. Notwithstanding any of the provisions of these Bylaws to the contrary, all meetings shall be subject to the Ralph M. Brown Act, commencing at Section 54950 of the Government Code of the State of California.
Section 3.6 Conduct of Meetings. The President or, in the absence of the President the Vice President, or, in the absence of the Vice President the Secretary, or, in the absence of the Secretary a Chairperson chosen by a majority of the Parties present, shall preside over the meeting.
Section 3.13 Quorum. A majority of the Parties constitutes a quorum for the transaction of business.
ARTICLE IV - OFFICERS
Section 4.1 Officers. The officers of the Yucaipa-SGMA shall be a President, a Vice President, a Secretary, a Treasurer.
Section 4.2 Election. The officers shall be chosen at the first Regular Meeting held each calendar year and each shall hold office until the officer shall resign, be removed, or be otherwise disqualified to serve, or the officer’s successor is elected.
Section 4.3 Removal and Resignation. Any officer may resign, or may be removed, with or without cause, at any time. Vacancies caused by death, resignation or removal of any officer may be filled by a majority vote of the Parties.
Section 4.4 President. The President shall preside at all meetings of the Parties.
Section 4.5 Vice President. In the absence of the President, the Vice President shall perform all the duties of the President.
Redlands Regular Meeting of 01-18-2022 Page 716 of 1274 Approved on May 23, 2018
6 Section 4.6 Secretary. The Secretary shall keep a book of minutes of all meetings, with the time and place of holding, the names of those present, and actions taken by the Parties.
Section 4.7 Treasurer. The Treasurer shall keep and maintain adequate and correct books of account showing the receipts and disbursements of the Yucaipa-SGMA, and an account of its cash and other assets, if any. Such books of account shall at all reasonable times be open to inspection by any Director.
The Treasurer shall deposit all moneys of the Yucaipa-SGMA with such depositories as are designated by the Parties and shall disburse the funds of the Yucaipa-SGMA as may be ordered, and shall render to the Parties, regular statements of the financial condition of the Yucaipa-SGMA.
ARTICLE V - MISCELLANEOUS
Section 5.1 Execution of Documents. The Parties may authorize any officer or officers as agent or agents, to enter into any contract or execute any instrument in the name of and on behalf of the Yucaipa-SGMA and such authority may be general or confined to specific instances; and unless so authorized, no officer, agent or other person shall have any power or authority to bind the Yucaipa-SGMA by any contract or engagement or to pledge its credit or to render it liable for any purpose or to any amount.
Section 5.2 Inspection of Bylaws. The Yucaipa-SGMA shall keep in its principal office the original or a copy of these Bylaws, as amended or otherwise altered to date, certified by the Secretary, which shall be open to inspection by members of the public at all reasonable times during office hours.
Section 5.3 Fiscal Year. The fiscal year of the Yucaipa-SGMA shall begin July 1 of each year and end on the last day of June of the succeeding year.
Redlands Regular Meeting of 01-18-2022 Page 717 of 1274 Approved on May 23, 2018
7 Section 5.4 Construction and Definitions. Unless the context otherwise requires, the general provisions, rules of construction and definitions contained in the Law shall govern the construction of these Bylaws. If any section, subsection, sentence, clause or phrase of these Bylaws, or the application thereof, is contrary to the Law, the provisions of the Law shall prevail. Without limiting the generality of the foregoing, the masculine gender includes the feminine and neuter, the singular number includes the plural and the plural number includes the singular, and the term “person” includes a corporation as well as a natural person.
Section 5.5 Amendments. New Bylaws may be adopted, or these Bylaws may be amended or repealed by the vote of the Parties. No amendment to these Bylaws shall be effective until approved by the Parties.
Approved unanimously on May 23, 2018.
Redlands Regular Meeting of 01-18-2022 Page 718 of 1274 Appendix 1-C
Public Outreach and Engagement Plan
Redlands Regular Meeting of 01-18-2022 Page 719 of 1274 Redlands Regular Meeting of 01-18-2022 Page 720 of 1274
PUBLIC OUTREACH AND ENGAGEMENT PLAN
Prepared for:
Yucaipa Sustainable Groundwater Management Agency
YucaipaSGMA.org
Prepared by:
605 Third Street
Encinitas, California 92024
July 2019
Redlands Regular Meeting of 01-18-2022 Page 721 of 1274 Redlands Regular Meeting of 01-18-2022 Page 722 of 1274 Public Outreach and Engagement Plan
TABLE OF CONTENTS
GLOSSARY OF TERMS/ABBREVIATIONS ................................................................. IV 1 BACKGROUND OF THE SUSTAINABLE GROUNDWATER MANAGEMENT
ACT ...................................................................................................................... 1
1.1 Sustainable Groundwater Management Act Requirements for Stakeholder Engagement ........................................................................ 2 2 YUCAIPA SUBBASIN AND GSA FORMATION .................................................. 3
2.1 Yucaipa SGMA and GSA Decision Making Process ............................. 4 3 YUCAIPA SUBBASIN GSP ................................................................................. 5 4 PURPOSE OF THE DOCUMENT ........................................................................ 5 5 OPPORTUNITIES FOR PUBLIC INVOLVEMENT AND ENGAGEMENT .......... 6
5.1 Meeting Opportunities ............................................................................. 6
5.1.1 Public Notices ................................................................................. 6
5.2 Collaborative Opportunities .................................................................... 6 Purveyors ................................................................................................... 7
5.2.1 South Mesa Water Company .......................................................... 7
5.2.2 South Mountain Water Company .................................................... 7
5.2.3 Western Heights Water Company ................................................... 7
5.2.4 Yucaipa Valley Water District .......................................................... 8 Municipalities ............................................................................................. 8
5.2.5 City of Redlands .............................................................................. 8
5.2.6 City of Yucaipa ................................................................................ 8 Regionals ................................................................................................... 9
5.2.7 San Bernardino Valley Municipal Water District .............................. 9
5.2.8 San Gorgonio Pass Water Agency .................................................. 9 Stakeholders .............................................................................................. 9
5.2.9 City of Calimesa .............................................................................. 9
5.2.10 County of Riverside ......................................................................... 9
5.2.11 County of San Bernardino ............................................................... 9
5.3 Opportunities for Tribal Communities ................................................. 10
5.4 Disadvantaged Communities ................................................................ 10
5.6 Online Resources .................................................................................. 10 6 CONTACT US .................................................................................................... 11 Redlands Regular Meeting of 01-18-2022 Page 723 of 1274 Public Outreach and Engagement Plan
FIGURES
Figure 1: Boundary Map ................................................................................................ 12 Figure 2: Tribal Trust Lands .......................................................................................... 13 Figure 3: Disadvantaged Communities ......................................................................... 14 Redlands Regular Meeting of 01-18-2022 Page 724 of 1274 Public Outreach and Engagement Plan
GLOSSARY OF TERMS/ABBREVIATIONS
Acronym/Abbreviation Definition
Yucaipa SGMA Yucaipa Sustainable Groundwater Management Agency GSA Groundwater Sustainability Agency
GSP Groundwater Sustainability Plan
DWR California Department of Water Resources
TAG Technical Advisory Group
SWRCB State Water Resources Control Board
South Mesa South Mesa Water Company
South Mountain South Mountain Water Company
WHWC Western Heights Water Company
YVWD Yucaipa Valley Water District
SBVMWD San Bernardino Valley Municipal Water District
SGPWA San Gorgonio Pass Water Agency
Term Definition
Aquifer An underground layer of water-bearing permeable rock, rock fractures or unconsolidated material (gravel, sand, or silt) that yields significant amounts of groundwater to wells or springs (DWR Bulletin 118).
Yucaipa Subbasin Upper Santa Ana Valley Groundwater Basin, Yucaipa Subbasin, identified as Groundwater Basin Number 8-2.07 in DWR Bulletin 118 – California’s Groundwater
Stakeholder An individual with interest in the Yucaipa Subbasin GSP Engagement Efforts made to understand and involve stakeholders and their concerns in the activities and decision-making of the Yucaipa GSA
Member Agencies The water purveyors, municipalities and regional water agencies who are members of the Yucaipa Groundwater
Sustainability Agency
Redlands Regular Meeting of 01-18-2022 Page 725 of 1274 Public Outreach and Engagement Plan
1 July 2019
1 BACKGROUND OF THE SUSTAINABLE GROUNDWATER
MANAGEMENT ACT
The Sustainable Groundwater Management Act, signed into law by Governor Jerry Brown on September 16, 2014, created a new framework for groundwater management in California. The framework includes a structure and schedule to achieve sustainable groundwater management within 20 years. The California Department of Water Resources (DWR) has historically managed the state’s central repository for groundwater data. Under The Sustainable Groundwater Management Act, DWR provides guidance, financial assistance, and technical support for compliance with state requirements. The State Water Resources Control Board (SWRCB) provides the regulatory backstop under The Sustainable Groundwater Management Act, taking over basin management and assessing fees if local groundwater management is not successful in complying with the requirements of The Sustainable Groundwater Management Act.
The Sustainable Groundwater Management Act established a new structure for local groundwater management through Groundwater Sustainable Agencies (GSAs). The formation of GSAs for all basins that the DWR designated as high and medium priority groundwater basins was required by July 1, 2017. Each GSA for these high and medium priority basins must then develop a Groundwater Sustainability Plan (GSP) that details how sustainable groundwater management will be achieved within 20 years of implementing the GSP. Sustainable groundwater management is defined by The Sustainable Groundwater Management Act as the management and use of groundwater in a manner that can be maintained during the planning and implementation horizon without causing undesirable results. This avoidance of undesirable results is measured through six sustainability indicators:
1. Chronic lowering of groundwater levels indicating a significant and unreasonable depletion of supply if continued over the planning and implementation horizon,
2. Significant and unreasonable reduction of groundwater storage,
3. Significant and unreasonable seawater intrusion,
4. Significant and unreasonable degradation of water quality,
5. Significant and unreasonable land subsidence, and
6. Depletion of interconnected surface water and groundwater that has significant and unreasonable adverse impacts on beneficial uses of the surface water.
The GSP is a tool used to help the GSA sustainably manage the basin. The criteria for sustainable management, including determining what is significant and unreasonable within the parameters of The Sustainable Groundwater Management Act for the Redlands Regular Meeting of 01-18-2022 Page 726 of 1274 Public Outreach and Engagement Plan
2 July 2019
groundwater basin managed by that GSA, must be assessed, with input from stakeholders, before the GSP can be adopted.
1.1 Sustainable Groundwater Management Act Requirements for Stakeholder Engagement
Stakeholder engagement is an important component of any successful long term planning effort. Engaging members of the public in groundwater sustainability planning will improve public understanding of the technical and political considerations the GSA factors into their decision-making process. Participation by the public will also improve the GSA’s understanding of the potential impacts of their decisions.
The Sustainable Groundwater Management Act recognized the importance of stakeholder engagement and laid out specific requirements for stakeholder engagement within each of the four phases of The Sustainable Groundwater Management Act:
Phase 1: GSA Formation and Coordination
The following Phase 1 requirements were completed by Yucaipa SGMA in 2017 and 2018:
Establish and maintain a list of interested parties
Provide public notice of the GSA formation
Conduct a GSA formation public hearing
Notify DWR of the GSA formation
Provide a written statement to DWR as well as cities and counties within the GSA boundary describing how interested parties may participate in the GSP development.
Develop GSA website for interested parties
Phase 2: GSP Preparation and Submission
The following Phase 2 requirements will be completed by Yucaipa SGMA by January 31, 2022:
Submit initial notification.
Prepare a GSP that considers beneficial uses and users of groundwater when describing undesirable results, minimum thresholds, projects and actions. The GSP must include a communication section that includes the following:
o An explanation of the Agency’s decision-making process. o Identification of opportunities for public engagement and a discussion of how public input and response will be used.
Redlands Regular Meeting of 01-18-2022 Page 727 of 1274 Public Outreach and Engagement Plan
3 July 2019
o A description of how the Agency encourages the active involvement of diverse social, cultural, and economic elements of the population within the basin.
o The method the Agency will follow to inform the public about progress implementing the Plan, including the status of projects and actions. The GSA must provide public noticing and hold a public meeting before adopting or amending a GSP.
Phase 3: GSP Review and Evaluation
The following Phase 3 requirements will be completed by DWR:
After the GSA adopts the GSP and it is submitted to DWR, the GSP will be available on the DWR website for a 60-day comment period for any person to provide comments to DWR before the DWR completes evaluation and assessment of the GSP.
Phase 4: Implementation and Reporting
The following Phase 4 requirements will be completed by Yucaipa SGMA through 2042:
The Sustainable Groundwater Management Act requires assessments and reevaluation of the GSP at least every 5 years. The GSA must provide public notice and hold public meetings prior to amending the GSP.
Public notice is also required before the GSA imposes or increases fees.
There are also has general requirements that apply to all four phases of Sustainable Groundwater Management Act implementation.
2 YUCAIPA SUBBASIN AND GSA FORMATION
The Upper Santa Ana Valley Groundwater Basin, Yucaipa Subbasin lies under portions of the cities of Calimesa, Redlands, and Yucaipa, as well as unincorporated San Bernardino and Riverside Counties. The Subbasin, cataloged by the California Department of Water Resources (DWR) as groundwater basin number 8-2.07, is approximately 25,300 acres (Figure 1).
The Yucaipa Sustainable Groundwater Management Agency (Yucaipa SGMA) was formed as the GSA for the Yucaipa Subbasin in 2017 through a Memorandum of Agreement (MOA) entered into by local water purveyors, municipalities, and regional water management entities.
Redlands Regular Meeting of 01-18-2022 Page 728 of 1274 Public Outreach and Engagement Plan
4 July 2019
Yucaipa-GSA Member Agencies
Purveyors
South Mesa Water Company
South Mountain Water Company
Western Heights Water Company
Yucaipa Valley Water District
Municipalities
City of Redlands
City of Yucaipa
Regionals
San Bernardino Valley Municipal Water District
San Gorgonio Pass Water Agency
The Yucaipa SGMA completed the initial phase of stakeholder engagement (Phase 1) in June 2017 and provided the required documentation for GSA formation, which is available to the public through the DWR Sustainable Groundwater Management Act Portal (https://sgma.water.ca.gov/portal/gsa/print/349).
The City of Calimesa submitted a written Notice of Withdrawal dated November 19, 2018 and the Yucaipa SGMA subsequently acknowledged the withdrawal of the City of Calimesa from the Yucaipa SGMA at the January 23, 2019 meeting.
2.1 Yucaipa SGMA and GSA Decision Making Process
The roles and responsibilities of the Yucaipa SGMA were further clarified in the By-Laws adopted in May 2018. Each of the Member Agencies appoints one principal representative and one alternate representative to the Yucaipa SGMA Board. All Board meetings are public meetings subject to the Ralph M. Brown Act. Each Board member has one vote and a simple majority of 51% of the voting parties is required to pass an item. A majority of the Board is considered a quorum for purposes of meeting and decision-making.
Redlands Regular Meeting of 01-18-2022 Page 729 of 1274 Public Outreach and Engagement Plan
5 July 2019
3 YUCAIPA SUBBASIN GSP
The DWR has designated the Yucaipa Subbasin as a high-priority basin based on population size and growth, reliance on groundwater for public water supply, and longterm declines in groundwater levels. The Yucaipa Subbasin is not designated as critically overdrafted, therefore a GSP must be developed by January 31, 2022. This GSP will detail a pathway to sustainable groundwater management by 2042 in accordance with the Sustainable Groundwater Management Act.
Yucaipa SGMA has initiated the process of developing a GSP (Yucaipa GSP) for the Yucaipa Subbasin that will define a course of action to achieve sustainable groundwater management within 20 years of plan adoption. The Yucaipa GSP will identify local undesirable results and identify management actions to minimize undesirable results as well as milestones to ensure progress. A groundwater monitoring program will be developed and implemented to track improvement within the basins leading to sustainable management. The Yucaipa GSP will be re-evaluated and refined, as needed, and submitted to DWR every five years in accordance with the Sustainable Groundwater Management Act.
4 PURPOSE OF THE DOCUMENT
This Public Outreach and Engagement Plan (Plan) has been developed as a communication tool to help stakeholders understand the importance of participation in groundwater sustainability planning and lay the framework of how stakeholders can actively engage in the Yucaipa-GSA planning effort. In 2018, DWR released a guidance document for GSP Stakeholder Communication and Engagement that details best practices including the development of Communication and Engagement Plans to increase transparency in the GSP development process.
The Yucaipa SGMA will prepare a GSP in accordance with The Sustainable Groundwater Management Act that will guide future management decisions including the amount of ground water that can be pumped from the subbasin without causing undesirable results, and the development of new projects to enhance water resource management.
The Yucaipa SGMA discussed overarching goals for outreach and engagement at the April 24, 2019 Board Meeting. The primary goals during the GSP development process included:
1. Maintaining transparency throughout the GSP development process,
2. Developing a common understanding among stakeholders of the Yucaipa subbasin needs, and
Redlands Regular Meeting of 01-18-2022 Page 730 of 1274 Public Outreach and Engagement Plan
6 July 2019
3. Exceeding the state requirements for outreach and engagement.
This Plan is intended to be a guiding framework that will be updated as needed to maintain transparency throughout the GSP development and implementation process. 5 OPPORTUNITIES FOR PUBLIC INVOLVEMENT
AND ENGAGEMENT
The Yucaipa SGMA encourages members of the public to participate in the GSP development and implementation process through attending public meetings, providing comments on the draft GSP, and communicating directly with member agency staff and Board members.
5.1 Meeting Opportunities
The Yucaipa SGMA Board holds quarterly regular meetings the fourth Wednesday in January, April, July, and October to conduct routine business matters. During the development of the GSP, the Technical Advisory Group (TAG) will meet approximately monthly as needed. All Board and TAG meetings are open to the public and each meeting agenda includes an item where members of the public can speak to the Board. All meeting agendas and minutes are posted on the Yucaipa SGMA website (https://yucaipasgma.org).
5.1.1 Public Notices
Board meetings and workshops are noticed in accordance with the Brown Act. In addition to publicly noticing meetings on the Yucaipa SGMA website, the Yucaipa SMGA maintains a list of interested parties and distributes electronic agenda information and newsletters via email. Newsletters include notices of Yucaipa SGMA Board meetings and other updates including updates on the progress of the GSP development and implementation. Interested parties can subscribe to the list that receives email notifications through the “subscribe” link at the bottom of the website home page (https://yucaipasgma.org).
5.2 Collaborative Opportunities
The Yucaipa-SMGA has taken an inclusive approach to groundwater management, making space on the Board for each of the local entities with water supply, water management, and or land use responsibility in the Yucaipa Subbasin that wanted to participate in the GSA. The Board understands that each interested party has an established relationship with their local water supplier that should continue through the development and implementation of the GSP. Each Board member is appointed by the Redlands Regular Meeting of 01-18-2022 Page 731 of 1274 Public Outreach and Engagement Plan
7 July 2019
member agency and represents the constituents in their jurisdiction. In addition to the Yucaipa SGMA Board member agencies, representatives from the City of Calimesa, the County of Riverside and the County of San Bernardino participated in the formation of the Yucaipa SGMA and are committed to continued involvement as representatives of their stakeholder interests. Due to this uniquely inclusive Board structure, Yucaipa SGMA views each Board member and stakeholder representative as an ambassador of their own jurisdiction, representing their interests in the Yucaipa SGMA meetings.
Purveyors
5.2.1 South Mesa Water Company
The South Mesa Water Company (South Mesa) is a mutual water company, formed in 1912, with approximately 4 square miles within the service area including portions of both the City of Calimesa and the City of Yucaipa. Water supplied by South Mesa is currently 100% groundwater. The South Mesa service area is approximately 90% residential with some industrial uses, several schools, and some small parks. South Mesa engages directly with shareholders through the annual shareholder meeting and updates as needed. South Mesa engages with shareholders through their website, regular Consumer Confidence Reports, social media platforms and information available at the South Mesa office. Many shareholders also pay their bills in person and converse regularly with South Mesa staff.
5.2.2 South Mountain Water Company
The South Mountain Water Company (South Mountain) is a mutual water company with groundwater production in the Yucaipa subbasin. The City of Redlands owns majority shares and operates the two wells owned by South Mountain. The business activities of the company are conducted by Bear Valley Mutual Water Company.
5.2.3 Western Heights Water Company
The Western Heights Water Company (WHWC) serves approximately 4.53 square miles including parts of the City of Yucaipa and the City of Redlands. Approximately 90% of WHWC customer demand is domestic with approximately 10% industrial and commercial use. WHWC currently has sufficient groundwater supply for 100% of the potable water demand, but purchases 25% imported water to offset groundwater demand. WHWC shareholders engage in decision making through participation in WHWC Board meetings.
Redlands Regular Meeting of 01-18-2022 Page 732 of 1274 Public Outreach and Engagement Plan
8 July 2019
5.2.4 Yucaipa Valley Water District
The Yucaipa Valley Water District (YVWD) is a special district that was formed in 1971 and supplies local groundwater, treated imported water, and recycled water. The Yucaipa Valley Water District service area is approximately 40 square miles and includes portions of the City of Calimesa and the City of Yucaipa. Approximately 78% of the water use in the YVWD is residential with approximately 22% commercial, industrial and institutional.
The YVWD engages with customers through their local office, website and consumer confidence reports. YVWD also published some notices in the local newspaper as appropriate.
Municipalities
5.2.5 City of Redlands
The City of Redlands was incorporated in 1888 and currently serves water to local businesses and more than 75,000 residents in Redlands, Mentone, parts of Crafton Hills, San Timoteo Canyon, and a small portion of San Bernardino. The City of Redlands supplies originate as surface water, groundwater and imported water. The City of Redlands provides ongoing communication with stakeholders through their website and social media. Important water-related information is distributed with consumer confidence reports and bills as appropriate.
5.2.6 City of Yucaipa
The City of Yucaipa was incorporated in 1989 and currently has over 58,000 residents.
Water service in the City is provided by YVWD, South Mesa, and WHWC. South Mountain has water facilities, including water wells, within the City of Yucaipa, but does not currently provide water services in the City. The entire City of Yucaipa is within the service area of the SBVMWD. The City of Yucaipa has several commissions and committees, including the Planning Commission, Parks and Recreation Commission, and Trails and Open Space Committee, that enable citizens to participate in the governance process. The City of Yucaipa regularly holds public meetings where members of the general public can voice concerns or issues. The City also engages with stakeholders through social media, the city website and newspaper publications as appropriate.
Redlands Regular Meeting of 01-18-2022 Page 733 of 1274 Public Outreach and Engagement Plan
9 July 2019
Regionals
5.2.7 San Bernardino Valley Municipal Water District
The San Bernardino Valley Municipal Water District was formed in 1954 as a regional water agency. The San Bernardino Valley Municipal Water District is a wholesale water supplier that imports water through the State Water Project, manages groundwater stored within the District boundaries, and coordinates delivery of imported water to local water retail agencies.
5.2.8 San Gorgonio Pass Water Agency
The San Gorgonio Pass Water Agency (SGPWA) was established in 1961 and supplies State Water Project water to retail water agencies. The SGPWA engages with stakeholders through semi-monthly public Board meetings and workshops. SGPWA provides regular updates on the website and through social media.
Stakeholders
5.2.9 City of Calimesa
The City of Calimesa was incorporated in 1990 and currently has over 8,000 residents.
Water service in the City is provided by South Mesa and YVWD. The entire City of Calimesa is within the San Gorgonio Pass Water Agency service area. The City has several active commissions and provides opportunities for public comment at all City Council and Commission meetings. The City also engages with stakeholders through their website and social media.
5.2.10 County of Riverside
The County of Riverside was formed in 1893 and covers nearly 7,300 square miles including 28 cities. The County provides information and updates on a centralized website as well as social media.
5.2.11 County of San Bernardino
The County of San Bernardino was formed in 1854 and covers 20,000 square miles including 24 cities. The County provides information and updates on a centralized website as well as social media.
Redlands Regular Meeting of 01-18-2022 Page 734 of 1274 Public Outreach and Engagement Plan
10 July 2019
5.3 Opportunities for Tribal Communities
According to the DWR Water Management Planning Tool, as of January 2019, there are no tribal trust lands within the Yucaipa Subbasin as shown in Figure 2. Although there are no federally recognized tribes, Indian land currently or historically held in Trust by the United States Government or smaller Reservation areas within the Yucaipa Subbasin, the Yucaipa SGMA encourages participation from all stakeholders including tribal communities within the watershed.
5.4 Disadvantaged Communities
There are several communities within the Subbasin that DWR has mapped as Disadvantaged Communities (DAC) and Severely Disadvantaged Communities (SDAC) based on median household income within community census tracts, blocks, and places as shown in Figure 3. The majority of the areas designated as DAC and SDAC are within either the City of Yucaipa or the City of Calimesa. Members of these communities are represented on the Yucaipa SGMA by both their City representative and their water supplier.
5.5 Stakeholder Email List
The Yucaipa SGMA maintains a list of stakeholders interested in the GSP process, known as the List of Interested Parties (List). Electronic newsletter, meeting notices, and notices of GSP documents are sent electronically to the List. There are currently over 100 individuals subscribed to the List. The List is continuously updated with individuals that request in writing to be placed on the list of interested parties or subscribe through the Yucaipa SGMA website.
5.6 Online Resources
The Yucaipa SGMA has created a website (www.YucaipaSGMA.org) that includes general information, relevant documents, a calendar of meetings and important events, as well as the agendas and minutes for all Yucaipa SGMA meetings.
Redlands Regular Meeting of 01-18-2022 Page 735 of 1274 Public Outreach and Engagement Plan
11 July 2019
6 CONTACT US
This document serves as a tool for facilitating public engagement in the GSP development process. It is designed to be a living document that is updated as needed to reflect current mechanism of engagement. Yucaipa SGMA will continue to use the communication tools outlined in this document as necessary through the implementation phase of the GSP.
For additional information regarding the Yucaipa SGMA and the GSP, please contact:
Bob Tincher, Deputy General Manager - Resources
Phone: (909) 387-9215
Email: [email protected]
Mailing Address:
San Bernardino Valley Municipal Water District
380 East Vanderbilt Way,
San Bernardino, California 92408
Website: www.YucaipaSGMA.org
Redlands Regular Meeting of 01-18-2022 Page 736 of 1274 Date: 6/20/2019 - Last saved by: hmcmanus - Path: Z:\Hydro\Projects\Yucaipa Basin Groundwater Sustainability Plan - 11507\MXD\WORKING\Public Outreach and Engagement Plan\Boundary Map.mxd Boundary Map
Public Outreach and Engagement Plan
SOURCE: ESRI, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordanance Survey, ESRI Japan, METI, ESRI China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIS User Community; DWR 0 0.5 1 n Miles
Yucaipa Groundwater Basin
FIGURE 1
Redlands Regular Meeting of 01-18-2022 Page 737 of 1274 Date: 6/20/2019 - Last saved by: hmcmanus - Path: Z:\Hydro\Projects\Yucaipa Basin Groundwater Sustainability Plan - 11507\MXD\WORKING\Public Outreach and Engagement Plan\Tribal Trust Lands.mxd Tribal Trust Lands
Public Outreach and Engagement Plan
SOURCE: ESRI, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordanance Survey, ESRI Japan, METI, ESRI China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIS User Community; BLM; DWR 0 1.5 3 n Miles
Yucaipa Groundwater Basin
Bureau of Indian Affairs
Tribal Trust Land and Reservation Boundaries
FIGURE 2
Redlands Regular Meeting of 01-18-2022 Page 738 of 1274 Date: 6/20/2019 - Last saved by: hmcmanus - Path: Z:\Hydro\Projects\Yucaipa Basin Groundwater Sustainability Plan - 11507\MXD\WORKING\Public Outreach and Engagement Plan\Disadvantaged Communities.mxd Disadvantaged Communities
Public Outreach and Engagement Plan
SOURCE: ESRI, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordanance Survey, ESRI Japan, METI, ESRI China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIS User Community; DWR 2019 0 0.75 1.5 n Miles
Yucaipa Groundwater Basin
Disadvantaged Communities - Places 2016
Disadvantaged Communities ($38,270 > MHI < $51,026)
Disadvantaged Communities - Tract 2016
Severly Disadvantaged Communities (MHI < $38,270)
Disadvantaged Communities ($38,270 > MHI < $51,026)
Disadvantaged Communities - Block Group 2016
No Data Available
Severly Disadvantaged Communities (MHI < $38,270)
Disadvantaged Communities ($38,270 > MHI < $51,026)
FIGURE 3
Note: MHI = Mean Household Income
Redlands Regular Meeting of 01-18-2022 Page 739 of 1274 This plan was paid for in part by a grant from the California Department of Water Resources through the Proposition 1 Sustainable Groundwater Planning Grant Program.
Redlands Regular Meeting of 01-18-2022 Page 740 of 1274 Appendix 2-A
Annual Precipitation and Water Year Type at
SBCFCD Climate Stations in the Yucaipa Subbasin
Redlands Regular Meeting of 01-18-2022 Page 741 of 1274 Redlands Regular Meeting of 01-18-2022 Page 742 of 1274 DRAFT Appendix 2-A. Annual Precipitation and Water Year-Type at San Bernardino County Flood Control District Climate Stations in the Yucaipa Subbasin 2915
(2235')
3099
(2140')
3356
(2125')
% of
Mean
Water Year
Type
3126A
(2813')
3132
(2710')
3386
(2620')
% of
Mean
Water Year
Type
2890
(2606')
% of
Mean
Water Year
Type
3126
(2815')
3128B
(2860')
% of
Mean
Water Year
Type
1953 5.41 32% Critically Dry 12.59 14.26 88% Below Normal 1954 18.12 109% Normal 17.84 16.92 114% Above Normal
1955 13.75 82% Below Normal 15.17 14.68 97% Normal
1956 11.68 70% Dry 11.72 11.83 77% Below Normal
1957 14.47 87% Below Normal 13.41 88% Below Normal
1958 24.72 181% Wet 26.48 159% Wet 27.95 183% Wet
1959 8.26 60% Dry 9.13 55% Dry 8.76 57% Dry
1960 15.98 117% Above Normal 14.03 84% Below Normal 13.25 87% Below Normal 1961 8.05 59% Dry 2.50 15% Critically Dry 7.63 50% Critically Dry 1962 18.68 137% Above Normal 16.78 101% Normal 18.84 123% Above Normal 1963 15.80 116% Above Normal 14.01 84% Below Normal 13.90 91% Normal 1964 12.65 93% Normal 11.04 66% Dry 11.74 77% Below Normal 1965 13.80 101% Normal 13.02 78% Below Normal
1966 17.80 130% Above Normal 19.63 18.19 113% Above Normal 1967 27.05 198% Wet 27.41 24.76 156% Wet
1968 15.25 112% Above Normal 15.46 16.80 97% Normal
1969 29.12 213% Wet 38.22 35.36 221% Wet
1970 8.53 62% Dry 10.26 9.91 60% Dry 10.03 66% Dry
1971 9.44 69% Dry 13.44 13.75 82% Below Normal 12.17 79% Below Normal 1972 6.26 46% Critically Dry 8.65 7.35 48% Critically Dry 8.73 57% Dry 1973 15.48 113% Above Normal 22.33 19.93 127% Above Normal 21.53 141% Above Normal 1974 9.98 73% Dry 14.32 11.83 78% Below Normal 12.52 82% Below Normal 1975 12.18 89% Below Normal 17.74 14.98 98% Normal 17.02 111% Above Normal 1976 10.84 79% Below Normal 18.19 15.89 102% Normal 17.35 113% Above Normal 1977 16.48 10.06 80% Below Normal 13.49 88% Below Normal 1978 36.63 29.65 199% Wet 30.84 201% Wet
1979 27.30 21.25 146% Above Normal 22.51 147% Above Normal 1980 24.67 181% Wet 30.98 26.95 174% Wet 21.03 137% Above Normal 1981 7.43 54% Dry 12.44 9.61 66% Dry
1982 16.05 118% Above Normal 21.53 18.68 121% Above Normal 1983 28.58 209% Wet 39.42 30.71 210% Wet
1984 6.87 50% Dry 10.48 8.96 58% Dry
1985 10.33 76% Below Normal 14.48 12.36 80% Below Normal 1986 12.36 91% Normal 18.25 13.83 96% Normal
1987 8.84 65% Dry 11.33 10.66 66% Dry
1988 12.10 89% Below Normal 16.96 13.69 92% Normal
1989 9.20 67% Dry 12.80 10.60 13.67 74% Dry
1990 7.40 54% Dry 1.50 10.19 13.77 51% Dry 10.99 72% Dry 1991 15.38 113% Above Normal 19.90 16.48 23.43 120% Above Normal 1992 14.88 109% Normal 20.23 16.80 24.42 123% Above Normal 1993 28.18 206% Wet 35.95 32.37 45.23 227% Wet
Water Year
Ending
Western Heights Calimesa Crafton Wilson Creek