Cities Index.
Agenda packet

Redlands City Council
June 7, 2022

Document
Agenda packet
Meeting
June 7, 2022
Body
Redlands City Council
Pages
11
Original file
159.9 MB
Text extracted from the city's file for reading and search. Open the original on s3.us-west-004.backblazeb2.com. That file is the official record.

District Name Original 1-A Original 1-B Original 1-C Annexation L1-A Annexation L1-B Annexation L2-A Annexation L3-A Annexation L4-A Annexation L4-B Annexation L4-C Annexation L4-D Annexation L4-E Annexation L4-F Annexation L4-G Annexation L4-H Description Tract 13282 Tract 13434 Tract 13496 Tract 13745 Tract 13765 Tract 13947 PM 11917 MS 185 MS 178 CUP 617 MS 184 CUP 382 CRA 606 CRA 486 CUP 253 Parcel Numbers Wabash Avenue San Bernardino
Avenue Alessandro Road San BernardinoAvenue
San Bernardino
Avenue Reservoir Road Lugonia Avenue APN 293-172-16THRU 18 APN 292-033-11 APN 167-231-19THRU 21 APN 171-383-19
& 20 APN 169-131-33 APN 292-321-10 APN 169-411-07
Maintenance
Contract
Maintenance $ 1,340 $ 1,340 $ 5,103 $ 1,190 $ 650 $ 550 $ - $ - $ - $ - $ - $ - $ - $ - $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ 520 $ 940 $ 4,450 $ 1,865 $ 1,360 $ 1,300 $ - $ - $ - $ - $ - $ - $ - $ - $ - Field Inspections $ 250 $ 250 $ 1,250 $ 250 $ 250 $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ 50 $ 50 $ 50 $ 50 $ 50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ 2,160 $ 2,580 $ 10,853 $ 3,355 $ 2,310 $ 1,850 $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental
Expenses
Engineering and
Admin. $ 250 $ 250 $ 1,475 $ 250 $ 250 $ 6 $ 600 $ - $ 60 $ 6 $ 18 $ 12 $ 6 $ 6 $ 6 SUBTOTAL $ 250 $ 250 $ 1,475 $ 250 $ 250 $ 6 $ 600 $ - $ 60 $ 6 $ 18 $ 12 $ 6 $ 6 $ 6 TOTAL

MAINTENANC
E &

INCIDENTAL
COSTS $ 2,410 $ 2,830 $ 12,328 $ 3,605 $ 2,560 $ 1,856 $ 600 $ - $ 60 $ 6 $ 18 $ 12 $ 6 $ 6 $ 6 Levy
Adjustments
Fund Collection $ (1) $ (4) $ (8) $ (4) $ (6) $ (261) $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

BALANCE TO
LEVY $ (1) $ (4) $ (8) $ (4) $ (6) $ (261) $ - $ - $ - $ - $ - $ - $ - $ - $ - Levy
Non-Adjacent Breakdown
Lots 30 74 7 29 23 31 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 8 4 0 9 2 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 2 0 0 4 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 0 0 0 0 0 0 0 0 10 1 3 2 1 1 1
TOTAL LOTS 38 78 9 38 25 35 0 0 10 1 3 2 1 1 1
Non-Adjacent
Rate per Lot $ 62.09 $ 36.05 $ 1,310.64 $ 92.57 $ 101.35 $ 44.55 $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ 68.30 $ 39.65 $ - $ 101.83 $ 111.48 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ 1,572.77 $ - $ 53.46 $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ - $ - $ - $ - $ - $ - $ - $ - $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL

ASSESSMENT
ALLOWABLE $ 2,409.10 $ 2,826.30 $ 12,320.02 $ 3,601.00 $ 2,554.01 $ 1,594.89 $ 600.00 $ - $ 60.00 $ 6.00 $ 18.00 $ 12.00 $ 6.00 $ 6.00 $ 6.00 Total # of
Parcels 38 78 9 38 25 35 4 4 10 1 3 2 1 1 1
Total Parcels
Levied 38 78 9 38 25 35 4 0 3 1 3 2 1 1 1
Redlands Regular Meeting 06-07-2022 1179 of 1593
District Name Annexation L4-I Annexation L4-J Annexation L4-K Annexation L4-L Annexation L4-M Annexation L4-N Annexation L4-O Annexation L4-P Annexation L4-Q Annexation L4-R Annexation L4-S Annexation L4-T Annexation L4-U Annexation L4-V Annexation L4-W Description CRA 608 CUP 519 CUP 516 CUP 518 CUP 522 CUP 521 CRA 605 PM 12087 MS 185 CUP 278 CUP 405 CRA 354 CRA 346 CRA 607 Tract 12461 Parcel Numbers APN 169-142-11 APN 171-331-04 APN 292-166-11 APN 169-053-12 APN 172-031-49 APN 292-034-16 APN 169-182-02, -03, -04 APN 171-261-01 APN 176-044-14& 15 APN 171-171-34 APN 169-343-07 APN 292-182-30& 31 APN 292-061-25 APN 292-156-21 APN 1212-191-60 THRU 79 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 550 Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 630 Field Inspections $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,180 Incidental
Expenses
Engineering and
Admin. $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ 18 $ 6 $ 12 $ - $ 6 $ 88 SUBTOTAL $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ 18 $ 6 $ 12 $ - $ 6 $ 88 TOTAL

MAINTENANC
E &

INCIDENTAL
COSTS $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ 18 $ 6 $ 12 $ - $ 6 $ 1,268 Levy
Adjustments
Fund Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ (1,148) General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

BALANCE TO
LEVY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ (1,148) Levy
Non-Adjacent Breakdown
Lots 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 1 1 1 1 1 1 3 0 1 3 1 2 0 1 20
TOTAL LOTS 1 1 1 1 1 1 3 0 1 3 1 2 0 1 20
Non-Adjacent
Rate per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.00 $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL

ASSESSMENT
ALLOWABLE $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 18.00 $ - $ 6.00 $ 18.00 $ 6.00 $ 12.00 $ - $ 6.00 $ 120.00 Total # of
Parcels 1 1 1 1 1 1 3 1 2 3 1 2 1 1 20
Total Parcels
Levied 1 1 1 1 1 1 3 0 1 3 1 2 0 1 20
Redlands Regular Meeting 06-07-2022 1180 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
LANDSCAPE MAINTENANCE DISTRICT NO. 1, FY 2022-2023

Page 3 of 7 ends

District Name Annexation L4-X Annexation L5-A Annexation L5-B Annexation L5-C Annexation L5-D Annexation L5-E Annexation L5-F Annexation L5-G Annexation L5-H Annexation L6-A Annexation L6-B Annexation L6-C Annexation L6-D Annexation L6-E Annexation L6-F Description PM 12022 MS 188 MS 189 Tract 14556 CRA 611 MS 196 MS 195 CRA 615 CRA 536 CRA 517 CRA 628 CRA 624 CRA 305 Tract 13575 CUP 550 Parcel Numbers APN 169-212-17
THRU 27
APN 292-153-24
THRU 27
APN 292-441-11
THRU 15
APN 176-441-18
THRU 27 0174-241-31 APN 292-331-15& 16
APN 294-091-47
& 48 APN 292-157-31 APN 292-381-17 APN 169-321-01& 02 APN 292-310-07 APN 169-281-39 APN 167-271-61 APN 1212-201-01THRU 27 APN 292-165-15 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 550 $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ 180 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 925 $ - Field Inspections $ - $ - $ - $ 350 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ 200 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ 730 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,475 $ - Incidental
Expenses
Engineering and
Admin. $ 66 $ 24 $ 30 $ 85 $ 12 $ 12 $ 12 $ 6 $ - $ 12 $ 6 $ 6 $ 6 $ 119 $ 6 SUBTOTAL $ 66 $ 24 $ 30 $ 85 $ 12 $ 12 $ 12 $ 6 $ - $ 12 $ 6 $ 6 $ 6 $ 119 $ 6 TOTAL

MAINTENANC
E &

INCIDENTAL
COSTS $ 66 $ 24 $ 30 $ 815 $ 12 $ 12 $ 12 $ 6 $ - $ 12 $ 6 $ 6 $ 6 $ 1,594 $ 6 Levy
Adjustments
Fund Collection $ - $ - $ - $ 0 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ (1,432) $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

BALANCE TO
LEVY $ - $ - $ - $ 0 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ (1,432) $ - Levy
Non-Adjacent Breakdown
Lots 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 11 4 5 0 2 2 2 1 0 2 1 1 1 27 1
TOTAL LOTS 11 4 5 10 2 2 2 1 0 2 1 1 1 27 1
Non-Adjacent
Rate per Lot $ - $ - $ - $ 78.37 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ 86.20 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ - $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL

ASSESSMENT
ALLOWABLE $ 66.00 $ 24.00 $ 30.00 $ 815.02 $ 12.00 $ 12.00 $ 12.00 $ 6.00 $ - $ 12.00 $ 6.00 $ 6.00 $ 6.00 $ 162.00 $ 6.00 Total # of
Parcels 11 4 5 10 2 2 2 1 1 2 1 1 1 27 1
Total Parcels
Levied 11 4 5 10 2 2 2 1 0 2 1 1 1 27 1
Redlands Regular Meeting 06-07-2022 1181 of 1593
District Name Annexation L6-G Annexation L6-H Annexation L6-I Annexation L6-J Annexation L7-A Annexation L7-B Annexation L7-C Annexation L7-D Annexation L7-E Annexation L7-F Annexation L7-G Annexation L7-H Annexation L7-I Annexation L8-A Annexation L8-B Description CRA 623 CUP 542 Tract 16310 MS 201 MS 213 MS 211 CUP 559 CRA 636 CRA 546 CRA 641 CRA 640 CUP 562 CUP 548 CRA 637 Tract 10179 Parcel Numbers APN 292-381-08 APN 292-064-13,
17, 21 THRU 27
APN 173-052-31
THRU 42 & APN
173-062-01
THRU 39
APN 171-341-33 APN 172-301-14
THRU 17
APN 292-201-36,
37, 38 changed to
292-201-37, -39,
and -40
APN 171-202-30 APN 169-043-14 APN 292-192-11 APN 292-310-36 APN 169-301-08, 10, 11 APN 292-064-17 APN 169-313-16 APN 169-281-23
APN 167-861-37
THRU 54, APN
167-851-39 THRU
56 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Field Inspections $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental
Expenses
Engineering and
Admin. $ 6 $ 54 $ 300 $ 6 $ 24 $ 18 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ - $ 216 SUBTOTAL $ 6 $ 54 $ 300 $ 6 $ 24 $ 18 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ - $ 216 TOTAL

MAINTENANC
E &

INCIDENTAL
COSTS $ 6 $ 54 $ 300 $ 6 $ 24 $ 18 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ - $ 216 Levy
Adjustments
Fund Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

BALANCE TO
LEVY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Levy
Non-Adjacent Breakdown
Lots 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 1 9 50 1 4 3 1 1 1 1 3 0 1 1 36
TOTAL LOTS 1 9 50 1 4 3 1 1 1 1 3 0 1 1 36
Non-Adjacent
Rate per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ - $ 6.00 TOTAL

ASSESSMENT
ALLOWABLE $ 6.00 $ 54.00 $ 300.00 $ 6.00 $ 24.00 $ 18.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 18.00 $ - $ 6.00 $ - $ 216.00 Total # of
Parcels 1 9 51 1 4 3 1 1 1 1 3 1 1 1 36
Total Parcels
Levied 1 9 50 1 4 3 1 1 1 1 3 0 1 0 36
Redlands Regular Meeting 06-07-2022 1182 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
LANDSCAPE MAINTENANCE DISTRICT NO. 1, FY 2022-2023

Page 5 of 7 ends

District Name Annexation L8-C Annexation L8-D Annexation L8-E Annexation L9-A Annexation L9-B Annexation L10-A Annexation L10-B Annexation L10-C Annexation L10-D Annexation L10-E Annexation L10-F Annexation L10-G Annexation L10-H Annexation L11-A Description CUP 574 CRA 642 MS 216 B CRA 648 CUP 581 CRA 658 CRA 639 CRA 652 CUP 602 CUP 590 CUP 577 CUP 541 Tract 14790-1 CRA 664 Parcel Numbers APN 171-202-33 APN 292-154-12 APN 174-021-41, 42 APN 292-157-16 APN171-203-13 APN 292-202-17 &18
APN 292-152-39,
32 APN 292-063-45 APN 292-063-48,-52, -53 APN 171-332-30 APN 1212-041-01 APN 174-261-15 Multiple APNs APN 292-341-24 &25 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Field Inspections $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental
Expenses
Engineering and
Admin. $ 6 $ 6 $ 12 $ 6 $ 6 $ 12 $ 6 $ 6 $ - $ 6 $ 6 $ 6 $ 240 $ 12 SUBTOTAL $ 6 $ 6 $ 12 $ 6 $ 6 $ 12 $ 6 $ 6 $ - $ 6 $ 6 $ 6 $ 240 $ 12 TOTAL

MAINTENANC
E &

INCIDENTAL
COSTS $ 6 $ 6 $ 12 $ 6 $ 6 $ 12 $ 6 $ 6 $ - $ 6 $ 6 $ 6 $ 240 $ 12 Levy
Adjustments
Fund Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

BALANCE TO
LEVY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Levy
Non-Adjacent Breakdown
Lots 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 1 1 2 1 1 2 1 1 0 1 1 1 40 2
TOTAL LOTS 1 1 2 1 1 2 1 1 0 1 1 1 40 2
Non-Adjacent
Rate per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ - $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL

ASSESSMENT
ALLOWABLE $ 6.00 $ 6.00 $ 12.00 $ 6.00 $ 6.00 $ 12.00 $ 6.00 $ 6.00 $ - $ 6.00 $ 6.00 $ 6.00 $ 240.00 $ 12.00 Total # of
Parcels 1 1 2 1 1 2 2 1 1 1 1 1 40 2
Total Parcels
Levied 1 1 2 1 1 2 1 1 0 1 1 1 40 2
Redlands Regular Meeting 06-07-2022 1183 of 1593
District Name Annexation L11-B Annexation L11-C Annexation L12-A Annexation L12-B Annexation L12-C Annexation L12-D Annexation L12-E Annexation L12-F Annexation L12-G Annexation L12-H Annexation L12-I Annexation L12-J Description CRA 666 Tract 11535 Tract 7202 Tract 7202 Tract 7202 Tract 7202 Tract 7202 Tract 15589 CUP 620 CUP 617 CRA 668 CRA 670 Parcel Numbers APN 292-158-15 APN 292-351-08 APN 176-402-09 APN176-402-08 APN 176-402-07 APN 176-402-06 APN 176-402-04 APN 293-421-01 THRU 45 APN 292-251-10 APN292-033-13 APN 292-341-17 APN 292-157-20 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Field Inspections $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental
Expenses
Engineering and
Admin. $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 270 $ 6 $ 6 $ 6 $ 6 SUBTOTAL $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 270 $ 6 $ 6 $ 6 $ 6 TOTAL

MAINTENANC
E &

INCIDENTAL
COSTS $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 270 $ 6 $ 6 $ 6 $ 6 Levy
Adjustments
Fund Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

BALANCE TO
LEVY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Levy
Non-Adjacent Breakdown
Lots 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 1 1 1 1 1 1 1 45 1 1 1 1
TOTAL LOTS 1 1 1 1 1 1 1 45 1 1 1 1
Non-Adjacent
Rate per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL

ASSESSMENT
ALLOWABLE $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 270.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 Total # of
Parcels 1 1 1 1 1 1 1 45 1 1 1 1
Total Parcels
Levied 1 1 1 1 1 1 1 45 1 1 1 1
Redlands Regular Meeting 06-07-2022 1184 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
LANDSCAPE MAINTENANCE DISTRICT NO. 1, FY 2022-2023

Page 7 of 7 ends

District Name Annexation L12-K Annexation L12-L Annexation L12-M TOTALS Description MS 235 MS 221 CRA 661
Parcel Numbers Multiple APNs APN 174-281-33,
-34, -35, -37 APN 171-161-18
Maintenance
Contract
Maintenance $ - $ - $ - $ 11,273
Repair Beyond
Contract $ - $ - $ - $ -
Water & Electric $ - $ - $ - $ 12,170
Field Inspections $ - $ - $ - $ 2,600
Supplies $ - $ - $ - $ 450
SUBTOTAL $ - $ - $ - $ 26,493
Incidental
Expenses
Engineering and
Admin. $ - $ 24 $ 6 $ 5,155
SUBTOTAL $ - $ 24 $ 6 $ 5,155
TOTAL

MAINTENANC
E &

INCIDENTAL
COSTS $ - $ 24 $ 6 $ 31,648
Levy
Adjustments
Fund Collection $ - $ - $ - $ (2,864)
General Fund
Contribution $ - $ - $ - $ -

BALANCE TO
LEVY $ - $ - $ - $ (2,864)
Levy
Non-Adjacent Breakdown
Lots 0 0 0 200
Adjacent Lots
(10%) 0 0 0 27
Adjacent Lots
(20%) 0 0 0 6
Per Lot City
Overhead 0 4 1 345
TOTAL LOTS 0 4 1
Non-Adjacent
Rate per Lot $ - $ - $ -
Adjacent Rate
(10%) per Lot $ - $ - $ -
Adjacent Rate
(20%) per Lot $ -
Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00
TOTAL

ASSESSMENT
ALLOWABLE $ - $ 24.00 $ 6.00 $ 28,784.34
Total # of
Parcels 21 4 1 615
Total Parcels
Levied 0 4 1 574
Redlands Regular Meeting 06-07-2022 1185 of 1593

APPENDIX B

DISTRICT DIAGRAM
Redlands Regular Meeting 06-07-2022 1186 of 1593

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1187 of 1593

CITY OF REDLANDS
LANDSCAPE MAINTENANCE DISTRICT NO. 1

APPENDIX B - ASSESSMENT DIAGRAMS
Redlands Regular Meeting 06-07-2022 1188 of 1593
2 Abbreviations
APN – Assessor’s Parcel Number
CRA – Commission Review and Approval
CUP – Conditional Use Permit
MS – Minor Subdivision
PM – Parcel Map
TM – Tract Map
General comments
Each annexation has its own diagram.

North is up unless notated otherwise.

The assessor’s parcel numbers are shown as a 9 digit number.

A dark red line delineates the boundary of each annexation.

A shaded background is typically used to indicate parcels within the Landscape Maintenance District.

Annexation #s
Original District A thru C
L1-A thru L1-B
L2-A
L3-A
L4-A thru L4-X
L5-A thru L5-H
L6-A thru L6-J
L7-A thru L7-I
L8-A thru L8-E
L9-A thru L9-B
L10-A thru L10-H
L11-A thru L11-C
L12-A thru L12-M
Redlands Regular Meeting 06-07-2022 1189 of 1593
3 Initial District - A
Tract Map 13282
Redlands Regular Meeting 06-07-2022 1190 of 1593
4 Initial District - B
Tract 13434
APN 167-802-01 thru 08, APN 167-803-01 thru -09, APN 167-804-01 thru -19, APN 167-823-01 thru 10, APN 167-824-01 thru -32,
Redlands Regular Meeting 06-07-2022 1191 of 1593
5 Initial District - C
Tract Map 13496
APN 0175-491-01 thru -09

Redlands Regular Meeting 06-07-2022 1192 of 1593
6 Annexation L1-A
Tract 13745
APN 1212-141-01 thru -38

Redlands Regular Meeting 06-07-2022 1193 of 1593
7 Annexation L1-B
Tract 13765
APN 1212-081-54 thru -62 and APN 1212-141-39 and -54

Redlands Regular Meeting 06-07-2022 1194 of 1593
8 Annexation L2-A
Tract 13947

Redlands Regular Meeting 06-07-2022 1195 of 1593
9 Annexation L3-A
Parcel Map 11917

Redlands Regular Meeting 06-07-2022 1196 of 1593
10 Annexation L4-A
Parcel Map 12450

Redlands Regular Meeting 06-07-2022 1197 of 1593
11 Annexation L4-B
Parcel Map 11755

Redlands Regular Meeting 06-07-2022 1198 of 1593
12 Annexation L4-C
CUP 617

Redlands Regular Meeting 06-07-2022 1199 of 1593
13 Annexation L4-D
Parcel Map 12300

Redlands Regular Meeting 06-07-2022 1200 of 1593
14 Annexation L4-E
CUP 382
Redlands Regular Meeting 06-07-2022 1201 of 1593
15 Annexation L4-F
CRA 606

Redlands Regular Meeting 06-07-2022 1202 of 1593
16 Annexation L4-G
CRA 486
Redlands Regular Meeting 06-07-2022 1203 of 1593
17 Annexation L4-H
CUP 253

Redlands Regular Meeting 06-07-2022 1204 of 1593
18 Annexation L4-I
CRA 808

Redlands Regular Meeting 06-07-2022 1205 of 1593
19 Annexation L4-J
CUP 519
Redlands Regular Meeting 06-07-2022 1206 of 1593
20 Annexation L4-K
CUP 516

Redlands Regular Meeting 06-07-2022 1207 of 1593
21 Annexation L4-L
CUP 518

Redlands Regular Meeting 06-07-2022 1208 of 1593
22 Annexation L4-M
CUP 522

Redlands Regular Meeting 06-07-2022 1209 of 1593
23 Annexation L4-N
CUP 521

Redlands Regular Meeting 06-07-2022 1210 of 1593
24 Annexation L4-O
CRA 805

Redlands Regular Meeting 06-07-2022 1211 of 1593
25 Annexation L4-P
Parcel Map 12087

Redlands Regular Meeting 06-07-2022 1212 of 1593
26 Annexation L4-Q
MS 185, Parcel Map 11904

Redlands Regular Meeting 06-07-2022 1213 of 1593
27 Annexation L4-R
CUP 278
Redlands Regular Meeting 06-07-2022 1214 of 1593
28 Annexation L4-S
CUP 405

Redlands Regular Meeting 06-07-2022 1215 of 1593
29 Annexation L4-T
CRA 354

Redlands Regular Meeting 06-07-2022 1216 of 1593
30 Annexation L4-U
CRA 346

Redlands Regular Meeting 06-07-2022 1217 of 1593
31 Annexation L4-V
CRA 607

Redlands Regular Meeting 06-07-2022 1218 of 1593
32 Annexation L4-W
Tract Map 12461
Redlands Regular Meeting 06-07-2022 1219 of 1593
33 Annexation L4-X
Parcel Map 12022
Redlands Regular Meeting 06-07-2022 1220 of 1593
34 Annexation L5-A
Parcel Map 12330

Redlands Regular Meeting 06-07-2022 1221 of 1593
35 Annexation L5-B
Parcel Map 12940

Redlands Regular Meeting 06-07-2022 1222 of 1593
36 Annexation L5-C
Tract 14556

Redlands Regular Meeting 06-07-2022 1223 of 1593
37 Annexation L5-D
CRA 611
Redlands Regular Meeting 06-07-2022 1224 of 1593
38 Annexation L5-E
Parcel Map 13261
Redlands Regular Meeting 06-07-2022 1225 of 1593
39 Annexation L5-F
Parcel Map 11189

Redlands Regular Meeting 06-07-2022 1226 of 1593
40 Annexation L5-G
CRA 615

Redlands Regular Meeting 06-07-2022 1227 of 1593
41 Annexation L5-H
CRA 536
Redlands Regular Meeting 06-07-2022 1228 of 1593
42 Annexation L6-A
CRA 517
Redlands Regular Meeting 06-07-2022 1229 of 1593
43 Annexation L6-B
CRA 628

Redlands Regular Meeting 06-07-2022 1230 of 1593
44 Annexation L6-C
CRA 624

Redlands Regular Meeting 06-07-2022 1231 of 1593
45 Annexation L6-D
CRA 305
Redlands Regular Meeting 06-07-2022 1232 of 1593
46 Annexation L6-E
Tract Map 13575
Redlands Regular Meeting 06-07-2022 1233 of 1593
47 Annexation L6-F
CUP 550
Redlands Regular Meeting 06-07-2022 1234 of 1593
48 Annexation L6-G
CRA 623

Redlands Regular Meeting 06-07-2022 1235 of 1593
49 Annexation L6-H

Parcel Map 13542

Redlands Regular Meeting 06-07-2022 1236 of 1593
50 Annexation L6-I
Parcel Map 10749
APN 0173-052-31 thru 42, APN 0173-062-01 thru 38, 39 (road) Redlands Regular Meeting 06-07-2022 1237 of 1593
51 Annexation L6-J
MS 201

Redlands Regular Meeting 06-07-2022 1238 of 1593
52 Annexation L7-A
MS 213, Parcel Map 13978

Redlands Regular Meeting 06-07-2022 1239 of 1593
53 Annexation L7-B
MS 211
Lot line adjustment shifted the boundary between 0292-201-36 and -38 northerly.

New APNs were assigned by the Assessor. APN 0292-201-36 became -39 and APN 0292-201-38 became -40.

Redlands Regular Meeting 06-07-2022 1240 of 1593
54 Annexation L7-C
CUP 559
Redlands Regular Meeting 06-07-2022 1241 of 1593
55 Annexation L7-D
CRA 696

Redlands Regular Meeting 06-07-2022 1242 of 1593
56 Annexation L7-E
CRA 543
Redlands Regular Meeting 06-07-2022 1243 of 1593
57 Annexation L7-F
CRA 641
Redlands Regular Meeting 06-07-2022 1244 of 1593
58 Annexation L7-G
CRA 640
Redlands Regular Meeting 06-07-2022 1245 of 1593
59 Annexation L7-H
CUP 562
Already included in Annexation L6-N
Redlands Regular Meeting 06-07-2022 1246 of 1593
60 Annexation L7-I
CUP 548
Redlands Regular Meeting 06-07-2022 1247 of 1593
61 Annexation L8-A
CRA 637
Redlands Regular Meeting 06-07-2022 1248 of 1593
62 Annexation L8-B
Tract Map 10179
APN 0167-851-39 thru 56 and APN 0167-861-37 thru 54
Redlands Regular Meeting 06-07-2022 1249 of 1593
63 Annexation L8-C
CUP 574
Redlands Regular Meeting 06-07-2022 1250 of 1593
64 Annexation L8-D
CUP 642
Redlands Regular Meeting 06-07-2022 1251 of 1593
65 Annexation L8-E
Parcel Map 14090
Redlands Regular Meeting 06-07-2022 1252 of 1593
66 Annexation L9-A
CRA 648

Redlands Regular Meeting 06-07-2022 1253 of 1593
67 Annexation L9-B
CUP 581
Redlands Regular Meeting 06-07-2022 1254 of 1593
68 Annexation L10-A
CRA 658

Redlands Regular Meeting 06-07-2022 1255 of 1593
69 Annexation L10-B
CRA 639
Redlands Regular Meeting 06-07-2022 1256 of 1593
70 Annexation L10-C
CRA 652
Redlands Regular Meeting 06-07-2022 1257 of 1593
71 Annexation L10-D
CUP 602
Redlands Regular Meeting 06-07-2022 1258 of 1593
72 Annexation L10-E
CUP 590
Redlands Regular Meeting 06-07-2022 1259 of 1593
73 Annexation L10-F
CUP 577
Redlands Regular Meeting 06-07-2022 1260 of 1593
74 Annexation L10-G
CUP 541
Redlands Regular Meeting 06-07-2022 1261 of 1593
75 Annexation L10-H
Tract Map 14790-1
APN 0176-521-01 thru -13, APN 0176-521-18 thru -23
APN 0176-521-27 thru -32, APN 0176-531-01 thru -03
APN 0176-531-07 thru -09, APN 0176-531-12, -13, and -18 APN 0176-531-20 thru -22, APN 0176-531-24 thru -26
Redlands Regular Meeting 06-07-2022 1262 of 1593
76 Annexation L11-A
CRA 664
Redlands Regular Meeting 06-07-2022 1263 of 1593
77 Annexation L11-B
CRA 666
Redlands Regular Meeting 06-07-2022 1264 of 1593
78 Annexation L11-C
Tract 11535, Lot 36
Redlands Regular Meeting 06-07-2022 1265 of 1593
79 Annexation L12-A, L12-B, L12-C, L12-D and L12-E
Annexation L12-A, APN 0176-402-09
Annexation L12-B, APN 0176-402-08
Annexation L12-C, APN 0176-402-07
Annexation L12-D, APN 0176-402-06
Annexation L12-E, APN 0176-402-04

Redlands Regular Meeting 06-07-2022 1266 of 1593
80 Annexation L12-F
Tract 15589
APN 0293-421-01 thru -45
Redlands Regular Meeting 06-07-2022 1267 of 1593
81 Annexation L12-G
CUP 620
Redlands Regular Meeting 06-07-2022 1268 of 1593
82 Annexation L12-H
CUP 617
Redlands Regular Meeting 06-07-2022 1269 of 1593
83 Annexation L12-I
CRA 668
Redlands Regular Meeting 06-07-2022 1270 of 1593
84 Annexation L12-J
CUP 670
Redlands Regular Meeting 06-07-2022 1271 of 1593
85 Annexation L12-K
MS 235
APN 0170-041-05, 0170-151-28, 0170-161-02, and 1212-431-02 Redlands Regular Meeting 06-07-2022 1272 of 1593
86 Annexation L12-L
MS 221
Redlands Regular Meeting 06-07-2022 1273 of 1593
87 Annexation L12-M
CRA 661
Redlands Regular Meeting 06-07-2022 1274 of 1593

APPENDIX C

RESOLUTIONS
Redlands Regular Meeting 06-07-2022 1275 of 1593

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1276 of 1593

CITY OF REDLANDS
LANDSCAPE MAINTENANCE DISTRICT NO. 1
APPENDIX C – RESOLUTIONS
Resolution No 8294 – Institute proceedings and appointment of engineer Resolution No 8295 – Preliminary approval of engineer’s report Resolution No 8296 – Declaring intention to levy assessments Resolution No 8297 – Confirming a diagram and assessments Redlands Regular Meeting 06-07-2022 1277 of 1593
This page intentionally left blank
Redlands Regular Meeting 06-07-2022 1278 of 1593
RESOLUTION NO. 8294

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS

INSTITUTING PROCEEDINGS FOR THE CONTINUED LEVY OF

ASSESSMENTS, APPOINTING AN ASSESSMENT ENGINEER, AND

ORDERING THE PREPARATION OF AN ENGINEER'S REPORT IN THE MATTER OF STREET LIGHTING DISTRICT NO. 1 AND LANDSCAPE
MAINTENANCE DISTRICT NO. 1
WHEREAS, the City Council of the City of Redlands (this “City Council”) has determined that the public interest, convenience and necessity requires the installation, operation and maintenance of a street lighting system and other facilities as set forth in Section 22525 of the California Streets and Highways Code; and
WHEREAS, it has been determined by the City Council of the City of Redlands (this “City Council”), that the public interest, convenience and necessity requires the maintenance of landscaping as set forth in Section 22525 of the California Streets and Highways Code; and WHEREAS, this City Council has formed Redlands’ Street Lighting District No. 1 to pay the costs associated with the installation, operation and maintenance of such street lighting system and other facilities; and
WHEREAS, this City Council has formed Redlands’ Landscape Maintenance District No. 1 to pay the costs for the maintenance such landscaping; and WHEREAS, it is the desire of this City Council to initiate proceedings and order the preparation of an engineer’s report to levy assessments for fiscal year 2022-2023 upon properties located within Street Lighting District No. 1 and Landscape Maintenance District No. 1; and WHEREAS, this City Council further desires to appoint Redlands’ Engineering Manager, Goutam Dobey, RCE No. 75646, as the "Assessment Engineer" for Street Lighting District No. 1 and Landscape Maintenance District No. 1;
NOW, THEREFORE, the City Council of the City of Redlands does hereby find, determine and resolve as follows:

Section 1. That the public interest, convenience and necessity requires the continued levy of assessments within Street Lighting District No. 1 for the purpose of installing, operating and maintaining street lights and associated facilities as authorized by Section 22620 of the California Streets and Highways Code and in compliance with Article XIIID, and Section 19 of Article XVI, of the California Constitution.

Section 2. That the public interest, convenience and necessity requires the continued levy of assessments within Landscape Maintenance District No. 1 for the purpose of maintaining landscaping and improvements as authorized by Section 22620 of the California Streets and Redlands Regular Meeting 06-07-2022 1279 of 1593
Highways Code and in compliance with the requirements of Article XIIID and Section 19 of Article XVI of the California Constitution.

Section 3. That the properties to be assessed for the installation, operation and maintenance of the street lighting facilities shall be those properties located within the boundaries of Street Lighting District No. 1.

Section 4. That the properties to be assessed for the maintenance and operation of the landscaping and improvements shall be those properties located within the boundaries of Landscape Maintenance District No. 1.

Section 5. That the proceedings for the continued levy of assessments within Street Lighting District No. 1 and Landscape Maintenance District No. 1 shall be conducted in accordance the with provisions of Division 15 of the California Streets and Highways Code (the Landscaping and Lighting Act of 1972) and in compliance with the requirements of Article XIIID, and Section 19 of Article XVI, of the California Constitution.

Section 6. That Redlands’ Engineering Manager, Goutam Dobey, RCE No. 75646, having an office located at 35 Cajon Street, Suite 15A, Redlands, California, is hereby appointed “Assessment Engineer” and shall have the authority conferred upon the Assessment Engineer by the Landscaping and Lighting Act of 1972.

Section 7. That the Assessment Engineer is hereby ordered to prepare a report in accordance with the Landscaping and Lighting Act of 1972.

ADOPTED, SIGNED AND APPROVED this 3rd day of May, 2022. ______________________________
Paul T. Barich, Mayor
ATTEST:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1280 of 1593
I, Jeanne Donaldson, City Clerk of the City of Redlands, do hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting thereof, held on the 3rd day of May, 2022 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAINED:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1281 of 1593
This page intentionally left blank.

Redlands Regular Meeting 06-07-2022 1282 of 1593
RESOLUTION NO. 8295

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS GIVING PRELIMINARY APPROVAL OF THE ENGINEER'S REPORTS FOR FISCAL YEAR 2022- 2023 FOR STREET LIGHTING DISTRICT NO. 1 AND LANDSCAPE MAINTENANCE DISTRICT NO. 1
WHEREAS, the City Council of the City of Redlands (the “City Council”) has heretofore determined that the public interest, convenience and necessity require the maintenance and operation of street lighting and appurtenant facilities, as set forth in Section 22525 of the Streets and Highways Code, within the incorporated boundaries of the City of Redlands; and WHEREAS, the City Council has heretofore determined that the public interest, convenience and necessity require the maintenance of landscape and irrigation facilities set forth in Section 22525 of the Streets and Highways Code, State of California, within the incorporated boundaries of the City of Redlands; and
WHEREAS, Goutam Dobey, City of Redlands’ Engineering Manager, 35 Cajon Street, Suite 15A, Redlands, California, has been appointed “Assessment Engineer” with all provisions of Part 2 of Division 15 of the Streets and Highways Code applicable to the Engineer being applied to the “Assessment Engineer;” and
WHEREAS, Sections 22622 and 22623 of the Streets and Highways Code require that an Engineer's Report be prepared and filed annually, specifying the assessments to be levied against the benefitting properties within the City’s Street Lighting District No. 1 and Landscape Maintenance District No. 1; and
WHEREAS, the City of Redlands Engineering Manager, as the Assessment Engineer, has prepared and filed with the City Clerk reports in writing as required by the Landscaping and Lighting Act of 1972 and in compliance with Article XIIID of the California Constitution; and WHEREAS, the City Council has duly considered said reports and each and every part thereof; and finds that each and every part of said reports is sufficient, and that no part of said reports requires modification in any respect;
NOW, THEREFORE, be it resolved by the City Council of the City of Redlands as follows:

Section 1. That the Engineer's estimate of the itemized costs and expenses of said work and of the incidental expenses in connection therewith, contained in said reports be, and each of them are hereby, preliminarily approved and confirmed.

Section 2. That the diagram showing the Street Lighting District No. 1 and Landscape Maintenance District No. 1 referred to and described in said reports, and the boundaries of the lots and parcels of land within such assessment district as the same existed at the time of passage of this resolution, are hereby preliminarily approved and confirmed.

Redlands Regular Meeting 06-07-2022 1283 of 1593
Section 3. That the proposed assessment upon the properties in Street Lighting District No. 1 and Landscape Maintenance District No. 1, in proportion to the estimated benefit to be received by such properties, respectively, from said work and of the incidental expenses thereof, as contained in said report is hereby preliminarily approved and confirmed.

Section 4. That said reports shall stand as the Engineer's Report for the purposes of all subsequent proceedings for Street Lighting District No. 1 and Landscape Maintenance District No. 1.

APPROVED AND ADOPTED this 7th day of June, 2022.
________________________
Paul T. Barich, Mayor
ATTEST:
__________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1284 of 1593
I, Jeanne Donaldson, City Clerk of the City of Redlands hereby certify that the foregoing resolution was duly adopted by the City Council at a regular meeting thereof held on the 7th day of June, 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAINED:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1285 of 1593
This page intentionally left blank.

Redlands Regular Meeting 06-07-2022 1286 of 1593
RESOLUTION NO. 8296

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS

DECLARING ITS INTENTION TO LEVY AND COLLECT ASSESSMENTS WITHIN REDLANDS’ STREET LIGHTING ASSESSMENT DISTRICT NO. 1 AND LANDSCAPE ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2021-2022 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, AND ESTABLISHING A TIME AND PLACE FOR PUBLIC HEARINGS

FOR THE TWO DISTRICTS TO CONSIDER PROTESTS

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:

Section 1. The City Council of the City of Redlands hereby (1) finds that the public interest and convenience requires, and (2) declares its intention to levy and collect, assessments against the lots and parcels of property within an existing assessment districts designated “Redlands’ Street Lighting Assessment District No. 1 and Landscape Assessment District No. 1” (the “Districts”) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code (commencing with Section 22500) (the “Act”) for fiscal year 2022-2023, commencing July 1, 2022, and ending June 30, 2023, to pay for the costs and expenses of the improvements described in Section 3 hereof.

Section 2. Reference is hereby made to a map on file in the office of the City Clerk and open for public inspection for a description of the exterior boundaries of the Districts.

Section 3. The proposed improvements are briefly described as follows: The operation, maintenance and servicing of public within the District, including the operation, maintenance and servicing of public lighting facilities and landscaping, including safety lighting, traffic signals, trees, shrubs, grass and other ornamental vegetation, and appurtenant facilities, located along public roadways, streets and rights-of-way within the boundaries of the Districts. “Maintenance” means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of the public lighting and landscaping facilities, and appurtenant facilities, including repair, removal or replacement of all or part of any of the public lighting and landscaping facilities, or appurtenant facilities. “Servicing” means the maintenance of any of the public lighting and landscaping facilities or appurtenant facilities, including the furnishing of electric current, energy or gas for the operation of any of the lighting facilities and the furnishing of water for the irrigation of any of the landscaping facilities.

Section 4. The assessments to be levied and collected against the assessable lots and parcels of property within the Districts for fiscal year 2022-2023 are not proposed to increase from the assessments levied and collected for fiscal year 1997-1998.

Section 5. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the Districts shall not be subject to assessment to be made under these proceedings to cover any of the costs and expenses of the improvements.

Redlands Regular Meeting 06-07-2022 1287 of 1593
Section 6. All railroad, gas, water and electric utility rights-of-way are included within the Districts and shall be assessed in accordance with the benefits received from the improvements.

Section 7. Reference is hereby made to the Reports of the Engineer entitled “City of Redlands Street Lighting District No. 1 Engineer’s Report for Fiscal Year 2022-2023” and “City of Redlands Landscape Maintenance District No. 1 Engineer’s Report for Fiscal Year 2022- 2023” on file in the office of the City Clerk for a full and detailed description of the improvements, the boundaries of the District and any zones therein and the proposed assessments upon assessable lots and parcels of land within the District.

Section 8. NOTICE IS HEREBY GIVEN THAT THE CITY COUNCIL APPOINTS TUESDAY, THE 21ST DAY OF JUNE, 2022, AT THE HOUR OF 6:00 P.M., OR AS SOON

THEREAFTER AS THE MATTER MAY BE HEARD, IN THE COUNCIL CHAMBERS AT CITY HALL, CITY OF REDLANDS, 35 CAJON STREET, SUITE 2, REDLANDS, CALIFORNIA 92373, AS THE TIME AND PLACE FOR TWO PUBLIC HEARINGS TO

CONSIDER PROTESTS OR OBJECTIONS TO THE LEVY OF THE PROPOSED ASSESSMENTS IN CONNECTION WITH THE DISTRICTS. All interested persons shall be afforded the opportunity to hear and be heard. Any interested person may file a written protest with the City Clerk prior to the conclusion of the hearing. A written protest shall state all grounds of objection. A protest by a property owner shall contain a description sufficient to identify the property owned by the signer thereof. The City Council shall consider all oral statements and all written protests made or filed by any interested person.

Section 9. The City Clerk is hereby authorized and directed to give notice of such hearing in accordance with law.

Section 10. The City Council hereby determines and declares that the proposed assessments constitute a continuation of assessments existing on the effective date of Article XIIID, that the assessments are imposed exclusively to finance the maintenance and operation expenses for streets and that the assessments are exempt from the requirements of Article XIIID, Section 4 of the California Constitution.

Section 11. The City Council hereby designates Goutam Dobey, Engineering Manager, telephone number (909) 798-7584 x2, to answer inquiries regarding the hearing, protest proceedings and procedural or technical matters.

Redlands Regular Meeting 06-07-2022 1288 of 1593
ADOPTED, SIGNED AND APPROVED this 7th day of June, 2022. ______________________________
Paul T. Barich, Mayor
ATTEST:
__________________________
Jeanne Donaldson, City Clerk
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was duly adopted by the City Council, at a regular meeting thereof, held on the 7th day of June, 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAINED:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1289 of 1593
This page intentionally left blank.

Redlands Regular Meeting 06-07-2022 1290 of 1593
RESOLUTION NO. 8277

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS CONFIRMING A DIAGRAM AND ASSESSMENT FOR THE 2022-2023

FISCAL YEAR IN CONNECTION WITH LANDSCAPE MAINTENANCE
DISTRICT NO. 1 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, PART 2 OF DIVISION 15 OF THE CALIFORNIA STREETS

AND HIGHWAYS CODE

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:

Section 1. Pursuant to its adoption of a prior resolution, the City Council of the City of Redlands initiated proceedings and declared its intention to levy an assessment against the assessable lots and parcels of property within an existing assessment district designated “Landscape Maintenance District No 1” (the District) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (commencing with Section 22500) (the “Act”) for the fiscal year commencing July 1, 2022, and ending June 30, 2023, and ordered the Engineering Manager, Goutam Dobey, to prepare and file a written report in accordance with Article 4 of Chapter 1 of the Act. The City Council, by prior resolution, approved such Engineer’s Report.

Section 2. Following notice duly given in accordance with law, this City Council has held a full and fair public hearing regarding the Engineer’s Report and the levy and collection of the proposed assessment within the District for fiscal year 2022-2023 to pay for the costs and expenses of the improvements described in the Engineer’s Report pursuant to the terms and provisions of the Act. All interested persons were afforded the opportunity to hear, and be heard regarding, protests and objections to the levy and collection of the proposed assessment against lots or parcels of property within the District. The City Council considered all oral and written statements, protests and communications made or filed by interested persons.

Section 3. Based upon its review of the Engineer’s Report and other reports and information, this City Council hereby finds and determines that (i) the land within the District will be benefited by the improvements described in the Engineer’s Report (ii) the District includes all of the lands so benefited, and (iii) the net amount to be assessed upon the lands with the District for the 2022-2023 fiscal year in accordance with the Engineer’s Report is apportioned by a formula and method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements. Any and all oral and written protests and objections are hereby overruled by the City Council.

Section 4. The City Council declares that the diagram and assessment in the Engineer’s Report are hereby confirmed as filed.

Section 5. The City Council hereby orders the improvements described in the Engineer’s Report to be made.

Redlands Regular Meeting 06-07-2022 1291 of 1593
Section 6. The assessment is in compliance with the provisions of the Act and the City Council has complied with all law pertaining to the levy of an annual assessment pursuant to the Act.

Section 7. The assessments to be levied and collected against the assessable lots and parcels of property within the District for fiscal year 2022-2023 are not proposed to increase from the assessment levied and collected for fiscal year 1997-1998.

Section 8. The assessment is levied without regard to property valuation.

Section 9. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the District shall not be subject to assessment to be made under these proceedings to pay for any of the costs and expenses of the improvements.

Section 10. The assessment is levied for the purpose of paying the costs and expenses of the improvements described in the Engineer’s Report for fiscal year 2022-2023.

Section 11. The improvements described in the Engineer’s Report shall be performed pursuant to law.

Section 12. The County Auditor of San Bernardino County shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes collected. After collection by the County, the net amount of the assessments shall be paid to the City Treasurer.

Section 13. The City Treasurer shall deposit all moneys representing assessments collected by the County to the credit of a special fund for Landscape Maintenance District No. 1.

Section 14. The adoption of this Resolution constitutes the levy of an assessment against the lots and parcels of land in the District for the fiscal year commencing July 1, 2022, and ending June 30, 2023.

Section 15. The City Clerk is hereby authorized and directed to file the diagram and assessment, or a certified copy of the diagram and assessment, with the County Auditor, together with a certified copy of this Resolution upon its adoption.

Section 16. A certified copy of the assessment and diagram shall be filed in the City’s Municipal Utilities and Engineering Department, with a duplicate copy on file in the office of the City Clerk and open for public inspection.

Redlands Regular Meeting 06-07-2022 1292 of 1593
ADOPTED, SIGNED AND APPROVED this 21st day of June 2022.

________________________________
Paul T. Barich, Mayor
ATTEST:
_______________________________
Jeanne Donaldson, City Clerk
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was adopted by the City Council, at a regular meeting thereof, held on the 21st day of June, 2022 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
________________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1293 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
0167-231-19-0000 709 LUGONIA AVE Annexation L4-D $ 6.00 0167-231-20-0000 705 LUGONIA AVE Annexation L4-D $ 6.00 0167-231-21-0000 1237 LAWTON ST Annexation L4-D $ 6.00
0167-271-61-0000 1135 CHURCH ST Annexation L6-D $ 6.00
0167-802-01-0000 1575 N COLUMBIA ST Original 1-B $ 39.65 0167-802-02-0000 1571 N COLUMBIA ST Original 1-B $ 36.05 0167-802-03-0000 1567 COLUMBIA ST Original 1-B $ 36.05
0167-802-04-0000 1563 COLUMBIA ST Original 1-B $ 36.05
0167-802-05-0000 1558 WOODBURY ST Original 1-B $ 36.05
0167-802-06-0000 1562 WOODBURY Original 1-B $ 36.05
0167-802-07-0000 1566 WOODBURY Original 1-B $ 36.05
0167-802-08-0000 1570 WOODBURY Original 1-B $ 39.65
0167-803-01-0000 1569 WOODBURY Original 1-B $ 39.65
0167-803-02-0000 1565 WOODBURY Original 1-B $ 36.05
0167-803-03-0000 1561 WOODBURY Original 1-B $ 36.05
0167-803-04-0000 610 ELISE Original 1-B $ 36.05
0167-803-05-0000 618 ELISE Original 1-B $ 36.05
0167-803-06-0000 626 ELISE Original 1-B $ 36.05
0167-803-07-0000 634 ELISE ST Original 1-B $ 36.05
0167-803-08-0000 1568 VERMONT Original 1-B $ 36.05
0167-803-09-0000 1574 VERMONT Original 1-B $ 39.65
0167-804-01-0000 633 ELISE Original 1-B $ 36.05
0167-804-02-0000 625 ELISE Original 1-B $ 36.05
0167-804-03-0000 617 ELISE Original 1-B $ 36.05
0167-804-04-0000 609 ELISE Original 1-B $ 36.05
0167-804-05-0000 601 ELISE Original 1-B $ 36.05
0167-804-06-0000 525 ELISE Original 1-B $ 36.05
0167-804-07-0000 517 ELISE Original 1-B $ 36.05
0167-804-08-0000 509 ELISE Original 1-B $ 36.05
0167-804-09-0000 1555 COLUMBIA ST Original 1-B $ 36.05
0167-804-10-0000 1551 COLUMBIA ST Original 1-B $ 36.05
0167-804-11-0000 1547 COLUMBIA ST Original 1-B $ 36.05
0167-804-12-0000 1543 N COLUMBIA ST Original 1-B $ 36.05 0167-804-13-0000 1528 CANTERBURY CIR Original 1-B $ 36.05 0167-804-14-0000 1530 CANTERBURY CIR Original 1-B $ 36.05 0167-804-15-0000 1532 CANTERBURY CIR Original 1-B $ 36.05 0167-804-16-0000 1534 CANTERBURY CIR Original 1-B $ 36.05 0167-804-17-0000 1536 CANTERBURY CIR Original 1-B $ 36.05 0167-804-18-0000 1538 CANTERBURY CIR Original 1-B $ 36.05 0167-804-19-0000 1540 CANTERBURY CIR Original 1-B $ 36.05 0167-823-01-0000 1539 CANTERBURY CIR Original 1-B $ 36.05 0167-823-02-0000 1537 CANTERBURY CIR Original 1-B $ 36.05 0167-823-03-0000 1535 CANTERBURY CIR Original 1-B $ 36.05 0167-823-04-0000 1533 CANTERBURY CIR Original 1-B $ 36.05 0167-823-05-0000 1531 CANTERBURY CIR Original 1-B $ 36.05 0167-823-06-0000 1509 CANTERBURY CIR Original 1-B $ 36.05 0167-823-07-0000 1507 CANTERBURY CIR Original 1-B $ 36.05 0167-823-08-0000 1505 CANTERBURY CIR Original 1-B $ 36.05 0167-823-09-0000 1503 CANTERBURY CIR Original 1-B $ 36.05 0167-823-10-0000 1501 CANTERBURY CIR Original 1-B $ 36.05 0167-824-01-0000 1539 COLUMBIA ST Original 1-B $ 36.05
0167-824-02-0000 1535 COLUMBIA ST Original 1-B $ 36.05
0167-824-03-0000 1531 COLUMBIA ST Original 1-B $ 36.05
0167-824-04-0000 1527 COLUMBIA ST Original 1-B $ 36.05
0167-824-05-0000 1523 COLUMBIA ST Original 1-B $ 36.05
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
Fiscal Year 2022/23 Page 1 of 11
Redlands Regular Meeting 06-07-2022 1294 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0167-824-06-0000 1519 COLUMBIA ST Original 1-B $ 36.05
0167-824-07-0000 1515 COLUMBIA ST Original 1-B $ 36.05
0167-824-08-0000 1511 COLUMBIA ST Original 1-B $ 36.05
0167-824-09-0000 1507 COLUMBIA ST Original 1-B $ 36.05
0167-824-10-0000 1503 COLUMBIA ST Original 1-B $ 36.05
0167-824-11-0000 1501 COLUMBIA ST Original 1-B $ 36.05
0167-824-12-0000 508 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-13-0000 512 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-14-0000 516 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-15-0000 520 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-16-0000 600 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-17-0000 602 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-18-0000 606 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-19-0000 610 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-20-0000 1500 CANTERBURY CIR Original 1-B $ 36.05 0167-824-21-0000 1502 CANTERBURY CIR Original 1-B $ 36.05 0167-824-22-0000 1504 CANTERBURY CIR Original 1-B $ 36.05 0167-824-23-0000 1506 CANTERBURY CIR Original 1-B $ 36.05 0167-824-24-0000 1508 CANTERBURY CIR Original 1-B $ 36.05 0167-824-25-0000 1510 CANTERBURY CIR Original 1-B $ 36.05 0167-824-26-0000 1512 CANTERBURY CIR Original 1-B $ 36.05 0167-824-27-0000 1514 CANTERBURY CIR Original 1-B $ 36.05 0167-824-28-0000 1516 CANTERBURY CIR Original 1-B $ 36.05 0167-824-29-0000 1518 CANTERBURY CIR Original 1-B $ 36.05 0167-824-30-0000 1520 CANTERBURY CIR Original 1-B $ 36.05 0167-824-31-0000 1522 CANTERBURY CIR Original 1-B $ 36.05 0167-824-32-0000 1524 CANTERBURY CIR Original 1-B $ 36.05 0167-851-39-0000 1832 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-40-0000 1828 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-41-0000 1824 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-42-0000 1820 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-43-0000 1816 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-44-0000 1812 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-45-0000 1808 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-46-0000 1804 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-47-0000 1800 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-48-0000 1835 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-49-0000 1831 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-50-0000 1827 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-51-0000 1823 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-52-0000 1819 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-53-0000 1815 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-54-0000 1811 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-55-0000 1807 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-56-0000 1803 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-37-0000 450 RIVERVIEW DR Annexation L8-B $ 6.00 0167-861-38-0000 1928 BROOKSTONE DR Annexation L8-B $ 6.00 0167-861-39-0000 1924 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-40-0000 1920 BROOKSTONE Annexation L8-B $ 6.00 0167-861-41-0000 1916 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-42-0000 1912 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-43-0000 1908 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-44-0000 1840 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-45-0000 1836 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-46-0000 1839 BROOKSTONE ST Annexation L8-B $ 6.00 Fiscal Year 2022/23 Page 2 of 11
Redlands Regular Meeting 06-07-2022 1295 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0167-861-47-0000 1907 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-48-0000 1911 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-49-0000 1915 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-50-0000 1919 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-51-0000 1923 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-52-0000 1927 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-53-0000 410 RIVERVIEW DR Annexation L8-B $ 6.00 0167-861-54-0000 420 RIVERVIEW DR Annexation L8-B $ 6.00 0168-681-01-0000 1067 MENDICINO WY Original 1-A $ 62.09 0168-681-02-0000 1063 MENDICINO WY Original 1-A $ 62.09 0168-681-03-0000 1059 MENDICINO WY Original 1-A $ 62.09 0168-681-04-0000 1055 MENDICINO Original 1-A $ 62.09
0168-681-05-0000 1051 MENDICINO WY Original 1-A $ 62.09 0168-681-06-0000 1047 MENDOCINO Original 1-A $ 62.09
0168-681-07-0000 1043 MENDICINO WY Original 1-A $ 62.09 0168-681-08-0000 1039 MENDICINO Original 1-A $ 62.09
0168-681-09-0000 1035 MENDICINO Original 1-A $ 62.09
0168-681-10-0000 1756 MENDOCINO WY Original 1-A $ 62.09 0168-681-11-0000 1762 MENDOCINO WY Original 1-A $ 62.09 0168-681-12-0000 1768 MENDOCINO Original 1-A $ 62.09
0168-681-13-0000 1774 MENDICINO Original 1-A $ 62.09
0168-681-14-0000 1780 MENDICINO WY Original 1-A $ 62.09 0168-681-15-0000 1786 MENDICINO Original 1-A $ 62.09
0168-681-16-0000 1792 MENDOCINO Original 1-A $ 62.09
0168-681-17-0000 1798 MENDICINO Original 1-A $ 68.30
0168-681-18-0000 1008 ALPINE CT Original 1-A $ 68.30
0168-681-19-0000 1012 ALPINE Original 1-A $ 68.30
0168-681-20-0000 1016 ALPINE CT Original 1-A $ 68.30
0168-681-21-0000 1020 ALPINE Original 1-A $ 68.30
0168-681-22-0000 1024 ALPINE Original 1-A $ 68.30
0168-681-23-0000 1028 ALPINE CT Original 1-A $ 68.30
0168-681-24-0000 1032 ALPINE CT Original 1-A $ 68.30
0168-681-25-0000 1029 ALPINE CT Original 1-A $ 62.09
0168-681-26-0000 1025 ALPINE CT Original 1-A $ 62.09
0168-681-27-0000 1021 ALPINE ST Original 1-A $ 62.09
0168-681-28-0000 1017 ALPINE ST Original 1-A $ 62.09
0168-681-29-0000 1013 ALPINE Original 1-A $ 62.09
0168-681-30-0000 1009 ALPINE CT Original 1-A $ 62.09
0168-681-31-0000 1005 ALPINE CT Original 1-A $ 62.09
0168-681-32-0000 1042 MENDICINO WY Original 1-A $ 62.09 0168-681-33-0000 1046 MENDICINO Original 1-A $ 62.09
0168-681-34-0000 1050 MENDOCINO Original 1-A $ 62.09
0168-681-35-0000 1054 MENDICINO BLVD Original 1-A $ 62.09 0168-681-36-0000 1058 MENDICINO Original 1-A $ 62.09
0168-681-37-0000 1062 MENDICINO Original 1-A $ 62.09
0168-681-38-0000 1066 MENDICINO WY Original 1-A $ 62.09 0169-043-14-0000 506 W COLTON AVE Annexation L7-D $ 6.00 0169-053-12-0000 306 W COLTON AVE Annexation L4-L $ 6.00 0169-131-33-0000 507 LAWTON ST Annexation L4-F $ 6.00
0169-142-11-0000 511 W COLTON AVE Annexation L4-I $ 6.00 0169-182-02-0000 Annexation L4-O $ 6.00
0169-182-03-0000 316 THE TERRACE Annexation L4-O $ 6.00 0169-182-04-0000 Annexation L4-O $ 6.00
0169-212-17-0000 640 ORANGE ST Annexation L4-X $ 6.00
0169-212-18-0000 526 N ORANGE ST Annexation L4-X $ 6.00 Fiscal Year 2022/23 Page 3 of 11
Redlands Regular Meeting 06-07-2022 1296 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0169-212-19-0000 500 N ORANGE ST Annexation L4-X $ 6.00 0169-212-20-0000 402-414 N ORANGE ST Annexation L4-X $ 6.00 0169-212-21-0000 418-450 N ORANGE ST Annexation L4-X $ 6.00 0169-212-22-0000 522 ORANGE ST Annexation L4-X $ 6.00
0169-212-23-0000 602 ORANGE ST Annexation L4-X $ 6.00
0169-212-24-0000 683 N 6TH ST Annexation L4-X $ 6.00
0169-212-25-0000 552 ORANGE ST Annexation L4-X $ 6.00
0169-212-26-0000 454-482 N ORANGE ST Annexation L4-X $ 6.00 0169-212-27-0000 411 N 6TH ST Annexation L4-X $ 6.00
0169-281-39-0000 347 ORANGE ST Annexation L6-C $ 6.00
0169-301-08-0000 E REDLANDS BLVD Annexation L7-G $ 6.00 0169-301-10-0000 21 E REDLANDS BLVD Annexation L7-G $ 6.00 0169-301-11-0000 170 E REDLANDS BLVD Annexation L7-G $ 6.00 0169-313-16-0000 304 7TH ST Annexation L7-I $ 6.00
0169-321-01-0000 Annexation L6-A $ 6.00
0169-321-02-0000 304 N 9TH ST Annexation L6-A $ 6.00
0169-343-07-0000 1210 W COLTON AVE Annexation L4-S $ 6.00 0169-411-07-0000 1205 W COLTON AVE Annexation L4-H $ 6.00 0171-161-18-0000 371 NEW YORK Annexation L12-M $ 6.00
0171-171-34-0000 380 N NEW YORK ST Annexation L4-R $ 18.00 0171-202-30-0000 404 BROOKSIDE AVE Annexation L7-C $ 6.00 0171-202-33-0000 420 BROOKSIDE AVE Annexation L8-C $ 6.00 0171-203-13-0000 302 BROOKSIDE AVE Annexation L9-B $ 6.00 0171-331-04-0000 243 CAJON ST Annexation L4-J $ 6.00
0171-332-30-0000 124 E OLIVE AVE Annexation L10-E $ 6.00 0171-341-33-0000 612 REDLANDS BLVD Annexation L6-J $ 6.00 0171-383-19-0000 680 E REDLANDS BLVD Annexation L4-E $ 6.00 0171-383-20-0000 680 E REDLANDS BLVD Annexation L4-E $ 6.00 0172-031-49-0000 30 S CENTER ST Annexation L4-M $ 6.00
0172-301-14-0000 1515 W CYPRESS AVE Annexation L7-A $ 6.00 0172-301-15-0000 1513 W CYPRESS AVE Annexation L7-A $ 6.00 0172-301-16-0000 1511 W CYPRESS AVE Annexation L7-A $ 6.00 0172-301-17-0000 1517 W CYPRESS AVE Annexation L7-A $ 6.00 0173-052-31-0000 432 SONORA CIR Annexation L6-I $ 6.00
0173-052-32-0000 430 SONORA CIR Annexation L6-I $ 6.00
0173-052-33-0000 428 SONORA CIR Annexation L6-I $ 6.00
0173-052-34-0000 426 SONORA CIR Annexation L6-I $ 6.00
0173-052-35-0000 424 SONORA CIR Annexation L6-I $ 6.00
0173-052-36-0000 422 SONORA CIR Annexation L6-I $ 6.00
0173-052-37-0000 420 SONORA CIR Annexation L6-I $ 6.00
0173-052-38-0000 418 SONORA CIR Annexation L6-I $ 6.00
0173-052-39-0000 416 SONORA CIR Annexation L6-I $ 6.00
0173-052-40-0000 412 SONORA CIR Annexation L6-I $ 6.00
0173-052-41-0000 410 SONORA CIR Annexation L6-I $ 6.00
0173-052-42-0000 457 LA VERNE Annexation L6-I $ 6.00
0173-062-01-0000 472 SONORA CIR Annexation L6-I $ 6.00
0173-062-02-0000 470 SONORA CIR Annexation L6-I $ 6.00
0173-062-03-0000 468 SONORA CIR Annexation L6-I $ 6.00
0173-062-04-0000 466 SONORA CIR Annexation L6-I $ 6.00
0173-062-05-0000 464 SONORA CIR Annexation L6-I $ 6.00
0173-062-06-0000 462 SONORA CIR Annexation L6-I $ 6.00
0173-062-07-0000 460 SONORA CIR Annexation L6-I $ 6.00
0173-062-08-0000 458 SONORA CIR Annexation L6-I $ 6.00
0173-062-09-0000 456 SONORA CIR Annexation L6-I $ 6.00
0173-062-10-0000 454 SONORA CIR Annexation L6-I $ 6.00
Fiscal Year 2022/23 Page 4 of 11
Redlands Regular Meeting 06-07-2022 1297 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0173-062-11-0000 452 SONORA CIR Annexation L6-I $ 6.00
0173-062-12-0000 450 SONORA CIR Annexation L6-I $ 6.00
0173-062-13-0000 448 SONORA CIR Annexation L6-I $ 6.00
0173-062-14-0000 446 SONORA CIR Annexation L6-I $ 6.00
0173-062-15-0000 444 SONORA CIR Annexation L6-I $ 6.00
0173-062-16-0000 442 SONORA CIR Annexation L6-I $ 6.00
0173-062-17-0000 440 SONORA CIR Annexation L6-I $ 6.00
0173-062-18-0000 438 SONORA CIR Annexation L6-I $ 6.00
0173-062-19-0000 436 SONORA CIR Annexation L6-I $ 6.00
0173-062-20-0000 434 SONORA CIR Annexation L6-I $ 6.00
0173-062-21-0000 408 SONORA CIR Annexation L6-I $ 6.00
0173-062-22-0000 406 SONORA CIR Annexation L6-I $ 6.00
0173-062-23-0000 407 SONORA CIR Annexation L6-I $ 6.00
0173-062-24-0000 473 SONORA CIR Annexation L6-I $ 6.00
0173-062-25-0000 471 SONORA CIR Annexation L6-I $ 6.00
0173-062-26-0000 469 SONORA CIR Annexation L6-I $ 6.00
0173-062-27-0000 457 SONORA CIR Annexation L6-I $ 6.00
0173-062-28-0000 455 SONORA CIR Annexation L6-I $ 6.00
0173-062-29-0000 453 SONORA CIR Annexation L6-I $ 6.00
0173-062-30-0000 451 SONORA CIR Annexation L6-I $ 6.00
0173-062-31-0000 439 SONORA CIR Annexation L6-I $ 6.00
0173-062-32-0000 437 SONORA CIR Annexation L6-I $ 6.00
0173-062-33-0000 435 SONORA CIR Annexation L6-I $ 6.00
0173-062-34-0000 431 SONORA CIR Annexation L6-I $ 6.00
0173-062-35-0000 421 SONORA CIR Annexation L6-I $ 6.00
0173-062-36-0000 423 SONORA CIR Annexation L6-I $ 6.00
0173-062-37-0000 425 SONORA CIR Annexation L6-I $ 6.00
0173-062-38-0000 427 SONORA CIR Annexation L6-I $ 6.00
0174-021-41-0000 1377 KNOLL RD Annexation L8-E $ 6.00
0174-021-42-0000 1379 KNOLL RD Annexation L8-E $ 6.00
0174-241-31-0000 1475 FORD ST Annexation L5-D $ 12.00
0174-261-15-0000 1551 RESERVOIR RD Annexation L10-G $ 6.00 0174-281-33-0000 BUCKINGHAM Annexation L12-L $ 6.00
0174-281-34-0000 BUCKINGHAM Annexation L12-L $ 6.00
0174-281-35-0000 BUCKINGHAM Annexation L12-L $ 6.00
0174-281-37-0000 731 BUCKINGHAM DR Annexation L12-L $ 6.00 0174-621-01-0000 751 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-02-0000 755 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-03-0000 759 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-04-0000 763 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-05-0000 767 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-06-0000 771 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-07-0000 775 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-08-0000 816 CONCORD Annexation L2-A $ 53.46
0174-621-09-0000 812 CONCORD Annexation L2-A $ 44.55
0174-621-10-0000 770 CONCORD Annexation L2-A $ 44.55
0174-621-11-0000 766 CONCORD Annexation L2-A $ 44.55
0174-621-12-0000 762 CONCORD Annexation L2-A $ 44.55
0174-621-13-0000 1609 SHEFFIELD Annexation L2-A $ 44.55 0174-621-14-0000 1613 SHEFFIELD Annexation L2-A $ 44.55 0174-621-15-0000 1617 SHEFFIELD Annexation L2-A $ 44.55 0174-621-16-0000 1621 SHEFFIELD Annexation L2-A $ 44.55 0174-621-17-0000 1625 SHEFFIELD Annexation L2-A $ 44.55 0174-621-18-0000 1629 SHEFFIELD Annexation L2-A $ 44.55 0174-621-19-0000 1633 SHEFFIELD Annexation L2-A $ 44.55 Fiscal Year 2022/23 Page 5 of 11
Redlands Regular Meeting 06-07-2022 1298 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0174-621-20-0000 1636 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-21-0000 1632 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-22-0000 1628 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-23-0000 801 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-24-0000 805 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-25-0000 809 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-26-0000 813 LEXINGTON LN Annexation L2-A $ 53.46 0174-621-27-0000 812 LEXINGTON LN Annexation L2-A $ 53.46 0174-621-28-0000 808 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-29-0000 804 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-30-0000 800 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-31-0000 1620 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-32-0000 1616 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-33-0000 769 CONCORD LN Annexation L2-A $ 44.55 0174-621-34-0000 811 CONCORD LN Annexation L2-A $ 44.55 0174-621-35-0000 815 CONCORD LN Annexation L2-A $ 53.46 0175-491-01-0000 1521 REBECCA CREST Original 1-C $ 1,572.77 0175-491-02-0000 REBECCA CREST Original 1-C $ 1,310.64
0175-491-03-0000 REBECCA CREST Original 1-C $ 1,310.64
0175-491-04-0000 1527 REBELLA CREST Original 1-C $ 1,310.64 0175-491-05-0000 1531 REBECCA CREST Original 1-C $ 1,310.64 0175-491-06-0000 1533 REBECCA CREST Original 1-C $ 1,310.64 0175-491-07-0000 1535 REBECCA CREST Original 1-C $ 1,310.64 0175-491-08-0000 1537 REBECCA CREST Original 1-C $ 1,310.64 0175-491-09-0000 1541 REBECCA CREST Original 1-C $ 1,572.77 0176-044-15-0000 605 VALLEY VIEW DR Annexation L4-Q $ 6.00 0176-402-04-0000 633 GOLDEN WEST DR Annexation L12-E $ 6.00 0176-402-06-0000 629 GOLDENWEST DR Annexation L12-D $ 6.00 0176-402-07-0000 627 GOLDEN WEST DR Annexation L12-C $ 6.00 0176-402-08-0000 GOLDEN WEST DR Annexation L12-B $ 6.00 0176-402-09-0000 623 GOLDEN WEST DR Annexation L12-A $ 6.00 0176-441-18-0000 1581 FRANKLIN AVE Annexation L5-C $ 78.37 0176-441-19-0000 1617 GARDEN ST Annexation L5-C $ 86.20 0176-441-20-0000 1613 GARDEN ST Annexation L5-C $ 86.20 0176-441-21-0000 1609 GARDEN ST Annexation L5-C $ 86.20 0176-441-22-0000 1583 FRANKLIN AVE Annexation L5-C $ 86.20 0176-441-23-0000 210 CANDY LN Annexation L5-C $ 78.37
0176-441-24-0000 226 CANDY LN Annexation L5-C $ 78.37
0176-441-25-0000 242 CANDY LN Annexation L5-C $ 78.37
0176-441-26-0000 250 CANDY LN Annexation L5-C $ 78.37
0176-441-27-0000 258 CANDY LN Annexation L5-C $ 78.37
0176-521-01-0000 1080 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-02-0000 1070 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-03-0000 1060 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-04-0000 1050 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-05-0000 1040 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-06-0000 1030 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-07-0000 1020 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-08-0000 1010 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-09-0000 1000 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-10-0000 912 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-11-0000 908 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-12-0000 904 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-13-0000 900 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-18-0000 1920 HORSE TRAIL DR Annexation L10-H $ 6.00 Fiscal Year 2022/23 Page 6 of 11
Redlands Regular Meeting 06-07-2022 1299 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0176-521-19-0000 1910 HORSE TRAIL DR Annexation L10-H $ 6.00 0176-521-20-0000 1900 HORSE TRAIL DR Annexation L10-H $ 6.00 0176-521-21-0000 1011 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-22-0000 1021 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-23-0000 1031 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-27-0000 1061 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-28-0000 1041 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-29-0000 907 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-30-0000 949 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-31-0000 901 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-32-0000 951 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-01-0000 948 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-02-0000 944 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-03-0000 940 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-07-0000 924 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-08-0000 920 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-09-0000 916 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-12-0000 921 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-13-0000 931 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-18-0000 911 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-20-0000 936 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-21-0000 928 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-22-0000 932 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-24-0000 915 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-25-0000 947 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-26-0000 945 SUNSET HILLS LN Annexation L10-H $ 6.00 0292-032-39-0000 1251 RESEARCH DR Annexation L3-A $ 195.55 0292-032-40-0000 1115 RESEARCH DR Annexation L3-A $ 39.88 0292-032-41-0000 1110 RESEARCH DR Annexation L3-A $ 62.73 0292-032-42-0000 2351 LUGONIA AVE Annexation L3-A $ 301.84 0292-033-11-0000 1101 N CALIFORNIA ST Annexation L4-C $ 6.00 0292-033-13-0000 1101 N CALIFORNIA ST Annexation L12-H $ 6.00 0292-034-16-0000 941 CALIFORNIA ST Annexation L4-N $ 6.00 0292-063-45-0000 1720 W REDLANDS BLVD Annexation L10-C $ 6.00 0292-064-13-0000 2094 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-17-0000 2098 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-21-0000 2046 REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-22-0000 2072 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-23-0000 2070 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-24-0000 2050 REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-25-0000 2068 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-26-0000 2062 REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-27-0000 2052 REDLANDS BLVD Annexation L6-H $ 6.00 0292-152-39-0000 2015 PARK AVE Annexation L10-B $ 6.00
0292-153-24-0000 1915 REDLANDS BLVD Annexation L5-A $ 6.00 0292-153-25-0000 1911 REDLANDS BLVD Annexation L5-A $ 6.00 0292-153-26-0000 721 NEVADA ST Annexation L5-A $ 6.00
0292-153-27-0000 721 NEVADA ST Annexation L5-A $ 6.00
0292-154-12-0000 1991 PARK AVE Annexation L8-D $ 6.00
0292-156-21-0000 1717 PARK AVE Annexation L4-V $ 6.00
0292-157-16-0000 1625 W REDLANDS BLVD Annexation L9-A $ 6.00 0292-157-20-0000 560 IOWA ST Annexation L12-J $ 6.00
0292-157-31-0000 1615 REDLANDS BLVD Annexation L5-G $ 6.00 0292-158-15-0000 ALABAMA ST Annexation L11-B $ 6.00
0292-165-15-0000 1890 ORANGE AVE Annexation L6-F $ 6.00 Fiscal Year 2022/23 Page 7 of 11
Redlands Regular Meeting 06-07-2022 1300 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0292-166-11-0000 1710 BARTON RD Annexation L4-K $ 6.00
0292-182-30-0000 614 ALABAMA ST Annexation L4-T $ 6.00
0292-182-31-0000 614 ALABAMA ST Annexation L4-T $ 6.00
0292-192-11-0000 301 TENNESSEE ST Annexation L7-E $ 6.00 0292-201-37-0000 141 KANSAS ST Annexation L7-B $ 6.00
0292-201-39-0000 125 KANSAS ST Annexation L7-B $ 6.00
0292-201-40-0000 210 BUSINESS CENTER CT Annexation L7-B $ 6.00 0292-202-17-0000 298 KANSAS ST Annexation L10-A $ 6.00
0292-202-18-0000 KANSAS ST Annexation L10-A $ 6.00
0292-251-10-0000 1280 ALABAMA ST Annexation L12-G $ 6.00 0292-310-07-0000 633 AMIGOS DR Annexation L6-B $ 6.00
0292-310-36-0000 617 AMIGOS DR Annexation L7-F $ 6.00
0292-321-10-0000 1981 W LUGONIA AVE Annexation L4-G $ 6.00 0292-331-15-0000 1910 ORANGE TREE LN Annexation L5-E $ 6.00 0292-331-16-0000 1902 ORANGE TREE LN Annexation L5-E $ 6.00 0292-341-17-0000 1751 PLUM LN Annexation L12-I $ 6.00
0292-341-24-0000 1711 PLUM LN Annexation L11-A $ 6.00
0292-341-25-0000 1741 PLUM LN Annexation L11-A $ 6.00
0292-351-08-0000 1806 ORANGE TREE LN Annexation L11-C $ 6.00 0292-381-08-0000 1653 PLUM LN Annexation L6-G $ 6.00
0292-441-11-0000 1230 INDIANA CT Annexation L5-B $ 6.00 0292-441-12-0000 1226 INDIANA CT Annexation L5-B $ 6.00 0292-441-13-0000 1222 INDIANA CT Annexation L5-B $ 6.00 0292-441-14-0000 1214 INDIANA CT Annexation L5-B $ 6.00 0292-441-15-0000 1210 INDIANA CT Annexation L5-B $ 6.00 0293-172-16-0000 1500 BARTON RD Annexation L4-B $ 27.00 0293-172-17-0000 1536 BARTON RD Annexation L4-B $ 27.00 0293-172-18-0000 1500 BARTON RD Annexation L4-B $ 6.00
0293-421-01-0000 1809 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-02-0000 1812 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-03-0000 1810 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-04-0000 1808 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-05-0000 1806 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-06-0000 1804 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-07-0000 1802 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-08-0000 1800 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-09-0000 1746 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-10-0000 1744 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-11-0000 1742 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-12-0000 1740 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-13-0000 1738 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-14-0000 1736 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-15-0000 1734 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-16-0000 1732 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-17-0000 1730 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-18-0000 1726 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-19-0000 1724 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-20-0000 1720 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-21-0000 1716 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-22-0000 1706 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-23-0000 1700 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-24-0000 1701 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-25-0000 1703 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-26-0000 1705 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-27-0000 1707 MORNING DOVE LN Annexation L12-F $ 6.00 Fiscal Year 2022/23 Page 8 of 11
Redlands Regular Meeting 06-07-2022 1301 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0293-421-28-0000 1709 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-29-0000 1711 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-30-0000 1715 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-31-0000 1717 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-32-0000 1719 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-33-0000 1721 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-34-0000 1723 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-35-0000 1725 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-36-0000 1727 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-37-0000 1729 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-38-0000 1731 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-39-0000 1733 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-40-0000 1735 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-41-0000 1737 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-42-0000 1743 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-43-0000 1747 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-44-0000 1803 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-45-0000 1805 MORNING DOVE LN Annexation L12-F $ 6.00 0294-091-47-0000 SMILEY RIDGE Annexation L5-F $ 6.00
0294-091-48-0000 1821 SMILEY RIDGE Annexation L5-F $ 6.00 1212-041-01-0000 1021 E PIONEER AVE Annexation L10-F $ 6.00 1212-081-54-0000 1709 DEANNA Annexation L1-B $ 101.35
1212-081-55-0000 1711 DEANNA Annexation L1-B $ 101.35
1212-081-56-0000 1715 DEANNA Annexation L1-B $ 101.35
1212-081-57-0000 1719 DEANNA Annexation L1-B $ 101.35
1212-081-58-0000 1723 DEANNA Annexation L1-B $ 101.35
1212-081-59-0000 1727 DEANNA WY Annexation L1-B $ 101.35 1212-081-60-0000 1731 DEANNA Annexation L1-B $ 101.35
1212-081-61-0000 1712 DEANNA Annexation L1-B $ 101.35
1212-081-62-0000 1708 DEANNA Annexation L1-B $ 101.35
1212-141-01-0000 1009 DOYLE Annexation L1-A $ 92.57
1212-141-02-0000 1013 DOYLE Annexation L1-A $ 92.57
1212-141-03-0000 1017 DOYLE Annexation L1-A $ 92.57
1212-141-04-0000 1021 DOYLE Annexation L1-A $ 92.57
1212-141-05-0000 1025 DOYLE ST Annexation L1-A $ 92.57
1212-141-06-0000 1029 DOYLE Annexation L1-A $ 92.57
1212-141-07-0000 1033 DOYLE Annexation L1-A $ 92.57
1212-141-08-0000 1037 DOYLE AVE Annexation L1-A $ 92.57 1212-141-09-0000 1041 DOYLE Annexation L1-A $ 92.57
1212-141-10-0000 1045 DOYLE Annexation L1-A $ 92.57
1212-141-11-0000 1058 STICKNEY Annexation L1-A $ 92.57
1212-141-12-0000 1054 STICKNEY Annexation L1-A $ 92.57
1212-141-13-0000 1050 STICKNEY Annexation L1-A $ 92.57
1212-141-14-0000 1046 STICKNEY Annexation L1-A $ 92.57
1212-141-15-0000 1042 STICKNEY Annexation L1-A $ 92.57
1212-141-16-0000 1038 STICKNEY CIR Annexation L1-A $ 101.83 1212-141-17-0000 1034 STICKNEY Annexation L1-A $ 101.83 1212-141-18-0000 1030 STICKNEY DR Annexation L1-A $ 101.83 1212-141-19-0000 1026 STICKNEY CIR Annexation L1-A $ 101.83 1212-141-20-0000 1022 STICKNEY AVE Annexation L1-A $ 101.83 1212-141-21-0000 1018 STICKNEY Annexation L1-A $ 101.83 1212-141-22-0000 1014 STICKNEY Annexation L1-A $ 101.83 1212-141-23-0000 1010 STICKNEY Annexation L1-A $ 101.83 1212-141-24-0000 1006 STICKNEY Annexation L1-A $ 101.83 1212-141-25-0000 1007 STICKNEY Annexation L1-A $ 92.57
Fiscal Year 2022/23 Page 9 of 11
Redlands Regular Meeting 06-07-2022 1302 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
1212-141-26-0000 1011 STICKNEY Annexation L1-A $ 92.57
1212-141-27-0000 1015 STICKNEY Annexation L1-A $ 92.57
1212-141-28-0000 1019 STICKNEY Annexation L1-A $ 92.57
1212-141-29-0000 1023 STICKNEY Annexation L1-A $ 92.57
1212-141-30-0000 1027 STICKNEY Annexation L1-A $ 92.57
1212-141-31-0000 1031 STICKNEY Annexation L1-A $ 92.57
1212-141-32-0000 1032 DOYLE Annexation L1-A $ 92.57
1212-141-33-0000 1028 DOYLE Annexation L1-A $ 92.57
1212-141-34-0000 1024 DOYLE AVE Annexation L1-A $ 92.57 1212-141-35-0000 1020 DOYLE Annexation L1-A $ 92.57
1212-141-36-0000 1016 DOYLE Annexation L1-A $ 92.57
1212-141-37-0000 1012 DOYLE Annexation L1-A $ 92.57
1212-141-38-0000 1008 DOYLE Annexation L1-A $ 92.57
1212-141-39-0000 1601 DEANNA Annexation L1-B $ 111.48
1212-141-40-0000 1605 DEANNA Annexation L1-B $ 101.35
1212-141-41-0000 1609 DEANNA Annexation L1-B $ 101.35
1212-141-42-0000 1613 DEANNA Annexation L1-B $ 101.35
1212-141-43-0000 1617 DEANNA Annexation L1-B $ 101.35
1212-141-44-0000 1621 DEANNA Annexation L1-B $ 101.35
1212-141-45-0000 1625 DEANNA Annexation L1-B $ 101.35
1212-141-46-0000 1701 DEANNA Annexation L1-B $ 101.35
1212-141-47-0000 1705 DEANNA Annexation L1-B $ 101.35
1212-141-48-0000 1704 DEANNA WY Annexation L1-B $ 101.35 1212-141-49-0000 1700 DEANNA Annexation L1-B $ 101.35
1212-141-50-0000 1622 DEANNA Annexation L1-B $ 101.35
1212-141-51-0000 1618 DEANNA Annexation L1-B $ 101.35
1212-141-52-0000 1614 DEANNA Annexation L1-B $ 101.35
1212-141-53-0000 1606 DEANNA Annexation L1-B $ 101.35
1212-141-54-0000 1602 DEANNA Annexation L1-B $ 111.48
1212-191-60-0000 1572 GROVE ST Annexation L4-W $ 6.00
1212-191-61-0000 1588 GROVE ST Annexation L4-W $ 6.00
1212-191-62-0000 1564 GROVE ST Annexation L4-W $ 6.00
1212-191-63-0000 1560 GROVE ST Annexation L4-W $ 6.00
1212-191-64-0000 1556 GROVE ST Annexation L4-W $ 6.00
1212-191-65-0000 1552 GROVE ST Annexation L4-W $ 6.00
1212-191-66-0000 1548 GROVE ST Annexation L4-W $ 6.00
1212-191-67-0000 1544 GROVE ST Annexation L4-W $ 6.00
1212-191-68-0000 1540 GROVE ST Annexation L4-W $ 6.00
1212-191-69-0000 1536 GROVE ST Annexation L4-W $ 6.00
1212-191-70-0000 1541 KELLY AVE Annexation L4-W $ 6.00
1212-191-71-0000 1545 KELLY AVE Annexation L4-W $ 6.00
1212-191-72-0000 1549 KELLY AVE Annexation L4-W $ 6.00
1212-191-73-0000 1553 KELLY AVE Annexation L4-W $ 6.00
1212-191-74-0000 1557 KELLY AVE Annexation L4-W $ 6.00
1212-191-75-0000 1561 KELLY ST Annexation L4-W $ 6.00
1212-191-76-0000 1565 KELLY ST Annexation L4-W $ 6.00
1212-191-77-0000 1569 KELLY ST Annexation L4-W $ 6.00
1212-191-78-0000 1573 KELLY ST Annexation L4-W $ 6.00
1212-191-79-0000 1577 KELLY ST Annexation L4-W $ 6.00
1212-201-01-0000 1572 NELSON ST Annexation L6-E $ 6.00
1212-201-02-0000 1568 NELSON ST Annexation L6-E $ 6.00
1212-201-03-0000 1560 NELSON ST Annexation L6-E $ 6.00
1212-201-04-0000 1556 NELSON ST Annexation L6-E $ 6.00
1212-201-05-0000 1552 NELSON ST Annexation L6-E $ 6.00
1212-201-06-0000 1548 NELSON ST Annexation L6-E $ 6.00
Fiscal Year 2022/23 Page 10 of 11
Redlands Regular Meeting 06-07-2022 1303 of 1593

APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
1212-201-07-0000 1540 NELSON ST Annexation L6-E $ 6.00
1212-201-08-0000 1536 NELSON ST Annexation L6-E $ 6.00
1212-201-09-0000 1528 NELSON ST Annexation L6-E $ 6.00
1212-201-10-0000 1524 NELSON ST Annexation L6-E $ 6.00
1212-201-11-0000 1520 NELSON ST Annexation L6-E $ 6.00
1212-201-12-0000 1346 PARADISE WY Annexation L6-E $ 6.00 1212-201-13-0000 1343 PENNSYLVANIA AVE Annexation L6-E $ 6.00 1212-201-14-0000 1349 PENNSYLVANIA AVE Annexation L6-E $ 6.00 1212-201-15-0000 1350 PARADISE WY Annexation L6-E $ 6.00 1212-201-16-0000 1354 PARADISE WY Annexation L6-E $ 6.00 1212-201-17-0000 1521 MORIARTY ST Annexation L6-E $ 6.00 1212-201-18-0000 1525 MORIARTY ST Annexation L6-E $ 6.00 1212-201-19-0000 1529 MORIARTY ST Annexation L6-E $ 6.00 1212-201-20-0000 1533 MORIARTY ST Annexation L6-E $ 6.00 1212-201-21-0000 1537 MORIARTY ST Annexation L6-E $ 6.00 1212-201-22-0000 1541 MORIARTY ST Annexation L6-E $ 6.00 1212-201-23-0000 1545 MORIARTY ST Annexation L6-E $ 6.00 1212-201-24-0000 1549 MORIARTY ST Annexation L6-E $ 6.00 1212-201-25-0000 1553 MORIARTY ST Annexation L6-E $ 6.00 1212-201-26-0000 1557 MORIARTY ST Annexation L6-E $ 6.00 1212-201-27-0000 1561 MORIARTY ST Annexation L6-E $ 6.00 Summary Fields Value
APN total count: 571
CHARGE total sum: $ 28,784.34
Fiscal Year 2022/23 Page 11 of 11
Redlands Regular Meeting 06-07-2022 1304 of 1593

APPENDIX D

ASSESSMENT ROLL
Redlands Regular Meeting 06-07-2022 1305 of 1593

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1306 of 1593

CITY OF REDLANDS
STREET LIGHTING DISTRICT NO. 1
ENGINEER’S REPORT
FOR FISCAL YEAR 2022-2023

CITY OF REDLANDS

MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT
Redlands Regular Meeting 06-07-2022 1307 of 1593

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1308 of 1593
ENGINEER’S REPORT AFFIDAVIT
Street Lighting District No. 1
City of Redlands
San Bernardino County, State of California
This Report describes the Street Lighting District No. 1 (“District”) and services therein including the improvements, budgets, parcels and assessments to be levied for Fiscal Year 2022-2023 as they existed at the time of the passage of the Resolution of Intention.

Reference is hereby made to the San Bernardino County Assessor’s maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed Report as directed by the City Council.

Dated this 1st day of June, 2022
By:

Goutam Dobey
Engineering Manager
R.C.E # 75646
Redlands Regular Meeting 06-07-2022 1309 of 1593

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1310 of 1593

TABLE OF CONTENTS

I. AUTHORITY FOR REPORT
II. GENERAL DESCRIPTION
III. PLANS AND SPECIFICATIONS
IV. IMPROVEMENTS
V. ASSESSMENT DIAGRAM
VI. ESTIMATED COSTS AND ASSESSMENTS
VII. ASSESSMENT ROLL
VIII. PROPOSED BASIS FOR ASSESSMENTS
IX. CALCULATION OF UOB AND INCIDENTAL COSTS FOR FY2022-2023 X. ESTIMATED ASSESSMENTS FOR FY2022-2023
APPENDIX A: CALCULATION OF UOB AND INCIDENTAL COST TABLE APPENDIX B: DISTRICT ASSESSMENT DIAGRAM
APPENDIX C: RESOLUTIONS
APPENDIX D: ASSESSMENT ROLL
Redlands Regular Meeting 06-07-2022 1311 of 1593

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1312 of 1593
1 AUTHORITY FOR REPORT
This report is prepared by order of the City Council of the City of Redlands, California (City). This report is in compliance with the requirements of Chapter 1, Article 4, and Chapter 3 of Division 15 of the Streets and Highway Code of the State of California (Landscape and Lighting Act of 1972) and Article XIIID of the California Constitution.

I. GENERAL DESCRIPTION
The City Council of the City of Redlands, California has heretofore elected to form Street Lighting District No. 1 (District) and annexed territories to said District. The boundaries of said District and annexations thereto are entitled “Assessment Diagram of Street Lighting District No. 1,” and are on file in the office of the City Clerk of the City of Redlands.

II. PLANS AND SPECIFICATIONS
All street lights are or will be owned by the City and are provided electrical services by Southern California Edison Company (SCE).

Reference is hereby made to the subject tract or parcel maps and assessment diagrams for the exact location of the parcels covered by the District. The plans and specifications by reference are hereby made a part of this report to the same extent as if said plans and specifications were attached hereto.

III. IMPROVEMENTS
The Landscaping and Lighting Act of 1972 allows the confirmation of benefit assessments for the construction of improvements in addition to maintenance and operation of existing facilities. Assessments will not be levied under the District to fund the installation of street lights during FY2022-2023. Therefore, this report does not include any proposed benefit assessments for the installation of improvements for FY2022-2023.

IV.ASSESSMENT DIAGRAM
The assessment District locations for the Original District and subsequent Annexations shown as Appendix B thereto have been prepared. The assessment diagrams by reference are hereby made a part of this report. The original diagram document used in prior Engineer’s Reports was updated in 2021 for purposes of clarity.

Since there were numerous locations as part of Annexation Nos. 1, 2, 3, 4, 5, etc. they were identified on the diagram as S1-A, S1-B, S1-C or S2-A, S2-B, S2-C, etc. Prefix S is added to the identification on the later Annexations to identify that they are within the District.

The same Annexation description will be used for identification with Sections IX and X of this report
Redlands Regular Meeting 06-07-2022 1313 of 1593
2 V. ESTIMATED COSTS AND MAINTENANCE
Since the City owns the street lighting system, all maintenance efforts by the City should be allocated to the District as a direct cost. The Municipal Utilities and Engineering Department has taken the information used in the previous annual report and updated the values based upon the formulas for Unit of Benefit. Southern California Edison (SCE) monthly rates were calculated based upon LS-2 schedule of rates for 100W and 150W high pressure sodium vapor street lights. Because the District costs have historically exceeded the revenue generated by District assessment, it is anticipated that minimal administration and no maintenance will be provided during the 2022-2023 year. As such, the labor amount has been significantly reduced to an estimated value of $6,855 to be spread equally over the number of street lights.

Given these parameters the following is the estimated monthly costs per lamp:

POLES SCE
CHARGE

DEPARTMENT

ADMINISTRATION

MONTHLY

LAMP COST
419 $ 2.82 $ 1.36 $ 1,751
The following information is from the City’s FY2017-2018 Budget:

Power Expenses
City Street Lighting S 15,000
Subtotal S 15,000
Administration
Salaries and Benefits $ 10,893
Maintenance $ 1,101
Subtotal S 11,994
Incidental
Other Professional Services $ 0
Subtotal $ 0
Total Costs S 26,994
2017-2018 Levy $ 25,465
Deficit $ 1,529
Total Parcels Levied 990
The District and Annexations, which are maintained by the City, have been in existence for a number of years. Over the years, the existing assessments have not kept pace with the true annual cost of maintenance and administration.

No new areas are being proposed to be annexed to the District for FY2022-2023.

Redlands Regular Meeting 06-07-2022 1314 of 1593
3 VI.ASSESSMENT ROLL
Following the public hearing for FY2022-2023 assessments and the City Council’s approval of the assessments, an assessment roll will be prepared. The assessment roll will include the assessment parcel number, the San Bernardino County Assessor’s parcel number and the confirmed assessment for each parcel. The assessment roll will be filed with the City Clerk and will subsequently be transmitted to the San Bernardino County Auditor/Tax Collector.

VII. PROPOSED BASIS FOR ASSESSMENTS
The City Council has heretofore determined that it will be necessary to utilize the provisions of the Landscaping and Lighting Act of 1972, a benefit assessment act, for the Original District and the subsequent Annexations to the District and to assess benefitting properties in proportion to the benefits that the various properties will receive.

The benefits the properties will receive will be assessed as increments of units of benefit (UOB). The District and the subsequent Annexations consist of various types of development having varying parcel sizes. Since the street lights either have been or will be installed in accordance with customary spacing established by the City, there will be four Assessment Zones based upon a street’s curb-to-curb width.

Assessments proposed for individual parcels within the District and Annexations will be for the benefit received and will be determined based upon the four following Assessment Zones.

Zone 1: This will include all parcels having frontage on streets with curb separation of less than 40’ or greater with 100watt HPSVL at 250’ spacing.

Zone 2: This will include all parcels having frontage on streets with curb separations of less than 40’ with 100 watt HPSVL at 600’ spacing.

Zone 3: This will include all parcels having frontage on streets with curb separations of 40’ or greater and less than 64’ with 150 watt HPSVL at 250’ spacing.

Zone 4: This will include all parcels having frontage on streets with curb separations of 64’ or more with 150 watt HPSVL at 230’ spacing.

Each of these four Assessment Zones will have assessments levied in UOB which is defined as increments of 100’ frontage on public streets, right-of-way or easements. The frontage length and the corresponding UOB are as follows:

FRONTAGE LENGTH UOB
Less than 199’ 1
200’ – 299’ 2
300’ – 399’ 3
And so forth
Redlands Regular Meeting 06-07-2022 1315 of 1593
4 The UOB assessments for the four Zones are calculated as follows:

Zone 1: Includes 100 watt high pressure, sodium vapor luminaries with a monthly billing rate from SCE, a minimal amount of labor (excluding City General Government Overhead and Facilities and Community Services Department maintenance) for a lamp cost of $8.49. Since the spacing will be 240’ ± 15’, a spacing of 250’ will be used in the calculation.
$8.49 x 12 x 100’ = $20.38 per UOB
500 UOB
Zone 2: Includes 100 watt high pressure, sodium vapor luminaries with a monthly billing rate from SCE, a minimal amount of labor (excluding City General Government Overhead and Facilities and Community Services Department maintenance) for a lamp cost of $8.49. Since the spacing will be 600’, a spacing of 600’ will be used in the calculation.
$8.49 x 12 x 100’ = $8.49 per UOB
1200 UOB
Zone 3: Includes 150 watt high pressure, sodium vapor luminaries with a monthly billing rate from SCE, a minimal amount of labor (excluding City General Government Overhead and Facilities and Community Services Department maintenance) for a lamp cost of $11.51. Since the spacing will be 265’ ± 15’, a spacing of 250’ will be used in the calculation.
$11.51 x 12 x 100’ = $27.63 per UOB
500 UOB
Zone 4: Includes 150 watt high pressure, sodium vapor luminaries with a monthly billing rate from SCE, a minimal amount of labor (excluding City General Government Overhead and Facilities and Community Services Department maintenance) for a lamp cost of $11.51. Since the spacing will be 215’ ± 15’, a spacing of 230’ will be used in the calculation.
$11.51 x 12 x 100’ = $30.03 per UOB
460 UOB
The incidental expenses are most equitably spread on a UOB basis, which is the same method for spreading the benefit from the direct lighting costs.

Redlands Regular Meeting 06-07-2022 1316 of 1593
5 VIII. CALCULATION OF UOB AND INCIDENTAL COSTS FOR FY2022-2023 For a breakdown of the UOB Incidental Costs see Appendix A – Calculation of UOB and Incidental Cost Table
IX.ESTIMATED ASSESSMENTS FOR FY2022-2023
The following calculations presume the on-site development has been completed and include the estimated energy, administration and engineering costs:

Original District (Zone 3) – Parcel Map 11917 APN 0292-032-39, 40, 41, 42 The four parcels will receive one UOB per 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of operation and maintenance to be assessed
N = Number of UOB in Parcel Map 11917
NA = C
A = $621.55/31
A = $20.05 per UOB
Assessment for each parcel:

Parcel 2 - 10 UOB = $200.50
Parcel 3 - 2 UOB = $40.10
Parcel 4 - 3 UOB = $60.15
Parcel 5 - 16 UOB = $320.80
Annexation S1-A – Parcel Map 12450, APN 0167-201-62 thru -65 These parcels are not assessed.

Redlands Regular Meeting 06-07-2022 1317 of 1593
6 Annexation S1-B (Zone 4) – Parcel Map 11755 APN 0293-172-16, 17, 18 The seven parcels in Annexation S1-B having street frontage will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S1-B with street frontage NA = C
A = $273.39/13
A = $21.03 per UOB
Assessment for each parcel:

Parcel 1 - 1 UOB = $21.03
Parcel 3 - 1 UOB = $21.03
Parcel 5 - 1 UOB = $21.03
Parcel 6 - 2 UOB = $42.06
Parcel 7 - 2 UOB = $42.06
Parcel 8 - 4 UOB = $84.12
Parcel 9 - 2 UOB = $42.06
The original parcels have been reconfigured into three Assessor’s Parcels.

Annexation S1-C (Zone 4) – CUP 617 APN 0292-033-11
The one parcel in Annexation S1-C will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S1-C
NA = C
A = $231.33/1
A = $231.33 per Parcel
Redlands Regular Meeting 06-07-2022 1318 of 1593
7 Annexation S1-D (Zone 3) – MS 184, Parcel Map 12300, APN 0167-231-19, 20, 21 The three parcels in Annexation S1-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S1-D
NA = C
A = $60.15/3
A = $20.05 per Parcel
Annexation S1-E (Zone 3) – CUP 382 APN 0171-383-19, 20
The two parcels in Annexation S1-E will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-E
NA = C
A = $40.10/2
A = $20.05 per Parcel
Annexation S1-F (Zone 1) – CRA 606 APN 0169-131-33
The one parcel in Annexation S1-F will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-F
NA = C
A = $19.45/1
A = $19.45 per Parcel
Redlands Regular Meeting 06-07-2022 1319 of 1593
8 Annexation S1-G (Zone 4) – CRA 486 APN 0292-321-10
The one parcel in Annexation S1-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-G
NA = C
A = $105.15/1
A = $105.15 per Parcel
Annexation S1-G (Zone 4) – CRA 486 APN 0292-321-10
The one parcel in Annexation S1-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-G
NA = C
A = $105.15/1
A = $105.15 per Parcel
Annexation S1-H (Zone 4) – CUP 253 APN 0169-411-07
The one parcel in Annexation S1-H will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-H
NA = C
A = $105.15/1
A = $105.15 per Parcel
Redlands Regular Meeting 06-07-2022 1320 of 1593
9 Annexation S1-I (Zone 3) – CRA 608 APN 0169-142-11
The one parcel in Annexation S1-I will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-I
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-J (Zone 3) – CUP 519 APN 0171-331-04
The one parcel in Annexation S1-J will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-J
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-K (Zone 4) – CUP 516 APN 0292-166-11
The one parcel in Annexation S1-K will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-K
NA = C
A = $273.39/1
A = $273.39 per Parcel
Redlands Regular Meeting 06-07-2022 1321 of 1593
10 Annexation S1-L (Zone 3) – CUP 518 APN 0169-053-12
The one parcel in Annexation S1-L will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-M (Zone 3) – CUP 522 APN 0172-031-49
The one parcel in Annexation S1-M will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-M
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-N (Zone 1) – Tract 13947 APN 0174-621-01 thru -35 The thirty-five parcels in Annexation S1-N will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-N
NA = C
A = $680.75/35
A = $19.45 per Parcel
Redlands Regular Meeting 06-07-2022 1322 of 1593
11 Annexation S1-O (Zone 3) – CUP 521 APN 0292-034-16
The one parcel in Annexation S1-O will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-P (Zone 1) – CUP 605 APN 0169-182-02, 03, 04 The three parcels in Annexation S1-P will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $38.90/3
A = $12.97 per Parcel
Annexation S1-Q – City Hall, APN 0171-301-03
The one parcel in Annexation S1-Q is not assessed.

Annexation S1-R – Parcel Map 11904, APN 0176-044-14, 15 The two parcels in Annexation S1-R are not assessed.

Redlands Regular Meeting 06-07-2022 1323 of 1593
12 Annexation S1-S (Zone 3) – CUP 278 APN 0171-171-18, 22, 23 The three parcels in Annexation S1-S will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $80.20/3
A = $26.73 per Parcel
Annexation S7-A was originally APN 0171-161-13 and was then changed to APN 0171- 161-14 and -15. Annexation S1-S was originally APN 0171-171-18, -22, and -23.

Assessments for Annexation S7-A and S1-S were combined and then adjusted proportionately. New APNs for both annexations are 0171-161-17 and 0171-171-34.

Assessment spread proportionately.

Annexation S1-T (Zone 3) – CUP 405 APN 0169-343-07
The one parcel in Annexation S1-T will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-T
NA = C
A = $20.05/1
A = $20.05 per Parcel
Redlands Regular Meeting 06-07-2022 1324 of 1593
13 Annexation S1-U (Zone 4) – CRA 354, Parcel Map 3131 APN 0292-182-30, 31 The two parcels in Annexation S1-U will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $42.06/2
A = $21.03 per Parcel
Annexation S1-V (Zone 1) – CRA 346 APN 0292-061-25
The one parcel in Annexation S1-V will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-V
NA = C
A = $19.45/1
A = $19.45 per Parcel
This property is owned by the County of San Bernardino and is not assessed.

Annexation S1-W (Zone 3) – CRA 607 APN 0292-156-21
The one parcel in Annexation S1-L will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-W
NA = C
A = $120.30/1
A = $120.30 per Parcel
Redlands Regular Meeting 06-07-2022 1325 of 1593
14 Annexation S1-X (Zone 1) – Tract 12461 APN 1212-191-60 thru -79 The twenty parcels in Annexation S1-X will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-X
NA = C
A = $389.00/20
A = $19.45 per Parcel
Annexation S1-Y (Zone 3) – Parcel Map 12022 APN 0169-212-17 thru -27 The eleven parcels in Annexation S1-Y having street frontage will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S1-Y
NA = C
A = $380.95/19
A = $20.05 per UOB
Assessment for each parcel:

Parcel 1 - 3 UOB = $60.15
Parcel 2 - 1 UOB = $20.05
Parcel 3 - 1 UOB = $20.05
Parcel 4 - 2 UOB = $40.10
Parcel 5 - 4 UOB = $80.20
Parcel 6 - 3 UOB = $60.15
Parcel 7 - 1 UOB = $20.05
Parcel 8 - 1 UOB = $20.05
Parcel 9 - 1 UOB = $20.05
Parcel 10 - 1 UOB = $20.05
Parcel 11 - 1 UOB = $20.05
Redlands Regular Meeting 06-07-2022 1326 of 1593
15 Annexation S2-A (Zone 3) – Parcel Map 12330 APN 0292-153-24, 25, 26, 27 The four parcels in Annexation S2-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-A
NA = C
A = $240.60/12
A = $20.05 per UOB
Assessment for each parcel:

Parcel 1 - 4 UOB = $80.20
Parcel 3 - 4 UOB = $80.20
Parcel 5 - 2 UOB = $40.10
Parcel 4 - 2 UOB = $40.10

Annexation S2-B (Zone 3) – Parcel Map 12940 APN 0292-441-11 thru 15 The five parcels in Annexation S2-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-B
NA = C
A = $60.15/5
A = $12.03 per Parcel
Annexation S2-C (Zone 3) – MS 184, Parcel Map 12300, APN 0167-231-19, 20, 21 This annexation is a duplication of Annexation S1-D and has been removed.

Redlands Regular Meeting 06-07-2022 1327 of 1593
16 Annexation S2-D (Zone 1) – Tract 14556 APN 0176-441-18 thru 27 The ten parcels in Annexation S2-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-D
NA = C
A = $330.65/10
A = $33.07 per Parcel
Annexation S2-E – CRA 611 APN 0174-241-31
This annexation is not assessed.

Annexation S2-F (Zone 3) – MS 196 APN 0292-331-15, 16
The two parcels in Annexation S2-F will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-F
NA = C
A = $160.40/2
A = $80.20 per Parcel
Annexation S2-G Parcel Map 11189 APN 0294-091-48, 48
The two parcels in Annexation S2-G are not assessed.

Redlands Regular Meeting 06-07-2022 1328 of 1593
17 Annexation S2-H (Zone 4) – CRA 615 APN 0292-157-31
The one parcel in Annexation S2-H will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-H
NA = C
A = $21.03/1
A = $21.03 per Parcel
Annexation S3-A (Zone 3) – CRA 517 APN 0169-321-01, 02
The two parcels in Annexation S3-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-A
NA = C
A = $80.20/2
A = $40.10 per Parcel
Annexation S3-B (Zone 1) – CRA 628 APN 0292-310-07
The one parcel in Annexation S3-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-B
NA = C
A = $19.45/1
A = $19.45 per Parcel
Redlands Regular Meeting 06-07-2022 1329 of 1593
18 Annexation S3-C (Zone 3) – CRA 624 APN 0169-281-39
The one parcel in Annexation S3-C will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-C
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S3-D (Zone 3) – CRA 305 APN 0167-271-61
The one parcels in Annexation S3-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-D
NA = C
A = $100.25/1
A = $100.25 per Parcel
Annexation S3-E (Zone 1) – Tract 13575 APN 1212-201-01 thru -27 The twenty-seven parcels in Annexation S3-E will receive an equal benefit assessment:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-E
NA = C
A = $700.20/27
A = $25.93 per Parcel
Redlands Regular Meeting 06-07-2022 1330 of 1593
19 Annexation S3-F (Zone 3 & 4) – CUP 550 APN 0292-165-15 The one parcel in Annexation S3-F will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-F
NA = C
A = $222.51/1
A = $222.51 per Parcel
Annexation S3-G (Zone 1) – CRA 623 APN 0292-381-08
The one parcel in Annexation S3-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-G
NA = C
A = $19.45/1
A = $19.45 per UOB
Redlands Regular Meeting 06-07-2022 1331 of 1593
20 Annexation S3-H (Zone 4) – CUP 542 APN 0292-064-13, 17, 21 thru 27 The nine parcels in Annexation S3-H will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-A
NA = C
A = $567.81/27
A = $21.03 per UOB
Assessment for each parcel:

Parcel 1 - 4 UOB = $84.12
Parcel 2 - 2 UOB = $42.06
Parcel 3 - 2 UOB = $42.06
Parcel 4 - 7 UOB = $147.21
Parcel 5 - 4 UOB = $84.12
Parcel 6 - 2 UOB = $42.06
Parcel 7 - 1 UOB = $21.03
Parcel 8 - 1 UOB = $21.03
Parcel 9 - 4 UOB = $84.12

Annexation S3-I – there is no Annexation S3-I
Annexation S3-J (Zone 3) – MS 201 APN 0171-341-33
The one parcel in Annexation S3-J will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-J
NA = C
A = $80.20/1
A = $80.20 per Parcel
Redlands Regular Meeting 06-07-2022 1332 of 1593
21 Annexation S4-A (Zone 4) – MS 213, Parcel Map 13978 APN 0172-301-14, 15, 16, 17 The four parcels in Annexation S4-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-A
NA = C
A = $63.09/3
A = $21.03 per UOB
Assessment for each parcel:

Parcel 1 - 2 UOB = $25.24
Parcel 2 - 1 UOB = $12.62
Parcel 3 - 1 UOB = $12.62
Parcel 4 - 1 UOB = $12.62
Annexation S4-B (Zone 3) – MS 211 APN 0292-201-36, 39
The two parcels in Annexation S4-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-B
NA = C
A = $100.25/5
A = $20.05 per UOB
Assessment for each parcel:

Parcel 1 - 2 UOB = $40.10
Parcel 2 - 3 UOB = $60.15
Parcel 2 lot line was adjusted with the property to the north. The assessment was spread proportionately - $47.57 to APN 0292-201-39 and $12.58 to APN 0292-201-40.

Redlands Regular Meeting 06-07-2022 1333 of 1593
22 Annexation S4-C (Zone 4) – CUP 559 APN 0171-202-30
The one parcel in Annexation S4-C will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-C
NA = C
A = $40.10/1
A = $40.10 per Parcel
Annexation S4-D (Zone 1) – CRA 636 APN 0169-043-14
The one parcel in Annexation S4-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-D
NA = C
A = $58.35/1
A = $58.35 per Parcel
Annexation S4-E (Zone 4) – CUP 546 APN 0292-192-11
The one parcel in Annexation S4-E will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-E
NA = C
A = $231.33
A = $231.33 per UOB
Redlands Regular Meeting 06-07-2022 1334 of 1593
23 Annexation S4-F (Zone 1) – CUP 641 APN 0292-310-36
The two parcels in Annexation S4-F will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-G
NA = C
A = $38.90/2
A = $19.45 per UOB
The two parcels were subsequently combined into a single parcel and the full assessment is on the one parcel.

Annexation S4-G (Zone 4) – CRA 640 APN 0169-301-08, 10, 11 The three parcels in Annexation S4-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:

A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-C
NA = C
A = $21.03/3
A = $7.01 per Parcel
Annexation S4-H (Zone 4) - CUP 562 APN 0292-064-17
The one parcel in Annexation S4-H will receive four UOB assessments for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S4-H
NA = C
A = $84.12/1
A = $84.12 per Parcel
Note that Annexation S4-H is already assessed in Annexation S3-H. Therefore, the assessment in Annexation S4-H is $0
Redlands Regular Meeting 06-07-2022 1335 of 1593
24 Annexation S4-I (Zone 1) - CUP 548 APN 0169-313-16
The one parcel in Annexation S4-I will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S4-1
NA = C
A = $77.80 /1
A = $77.80 per Parcel
Annexation S5-A – CRA 637 APN 0169-281-23
This property became a City owned parcel and was removed from the assessment roll.

Annexation S5-B (Zone 1) - Tract 10179 APN 0167-851-39 thru 56, 0167-861-37 thru 54 The thirty-six parcels in Annexation S5-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S5-B
NA = C
A = $505.70/36
A = $14.05 per Parcel
Redlands Regular Meeting 06-07-2022 1336 of 1593
25 Annexation S5-C (Zone 1) - CUP 574 APN 0171-202-33
The one parcel in Annexation S5-C will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S5-C
NA = C
A = $19.45/1
A = $19.45 per Parcel
Annexation S5-D (Zone 3) - CRA 642 APN 0292-154-12
The one parcel in Annexation S5-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation 85·0
NA = C
A = $100.25/1
A = $100.25 per Parcel
Annexation S5-E (Zone 1) - MS 216-B Parcel Map 14090 APN 0174-021-41, 42 The two parcels in Annexation S5-E will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S5-E
NA = C
A = $38.90/2
A = $19.45 per Parcel
Redlands Regular Meeting 06-07-2022 1337 of 1593
26 Annexation S6-A (Zone 4) - CRA 648 APN 0292-157-16
The one parcel in Annexation S6-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S6-A
NA = C
A = $189.27/1
A = $189.27 per Parcel
Annexation S6-B (Zone 1) - CUP 581 APN 0171-203-13
The one parcel in Annexation S6-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S6-B
NA = C
A = $38.90/1
A = $38.90 per Parcel
Redlands Regular Meeting 06-07-2022 1338 of 1593
27 Annexation S7-A (Zone 3): MS 228 APN 0171-161-17
The two parcels in Annexation S7-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-A
NA = C
A = $200.50/2
A = $100.25 per Parcel
Annexation S7-A was originally APN 0171-161-13 and was then changed to APN 0171- 161-14 and -15. Annexation S1-S was originally APN 0171-171-18, -22, and -23.

Assessments for Annexation S7-A and S1-S were combined and then adjusted proportionately. New APNs for both annexations are 0171-161-17 and 0171-171-34.

Assessment spread proportionately.

Annexation S7-B (Zone 3): CRA 639 APN 0292-152-39
The one parcel in Annexation S7-B will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-B
NA = C
A = $100.25/1
A = $100.25 per Parcel
Annexation S7-C (Zone 4) - CUP 602 APN 0292-063-48
The one parcel in Annexation S7-C will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-C
NA = C
A = $42.06/1
A = $42.06 per Parcel
Redlands Regular Meeting 06-07-2022 1339 of 1593
28 Annexation S7-D (Zone 1) - CUP 590 APN 0171-332-30
The one parcel in Annexation S7-D will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-D
NA = C
A = $38.90/1
A = $38.90 per Parcel
Annexation S7-E (Zones 1 & 3) - CUP 607 APN 0167-101-13 The one parcel in Annexation S7-E will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-E
NA = C
A = $198.10/1
A = $198.10 per Parcel
Annexation S7-F (Zone 1) - CUP 577 APN 1212-041-01
The one parcel in Annexation S7-F will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-F
NA = C
A = $77.80/1
A = $77.80 per Parcel
Redlands Regular Meeting 06-07-2022 1340 of 1593
29 Annexation S7-G (Zone 1) - CUP 541 APN 0174-261-15
The one parcel in Annexation S7-G will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-G
NA = C
A = $155.60/1
A = $155.60 per Parcel
Annexation S7-H (Zone 2) - Tract 14790-1 APN 0176-521-01 thru -13, -18 thru -23, -27 thru -32, APN 0176-531-01, 02, 03, 07, 08, 09, 12, 13, 18, 20, 21, 22, 24, 25, 26 The forty parcels in Annexation S7-H will receive an equal benefit assessment.

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-H
NA = C
A = $1,660.00/40
A = $41.50 per Parcel
Annexation S8-A (Zone 3) - CUP 584 APN 0172-121-03
The one parcel in Annexation S8-A will receive the entire benefit assessment. The calculations for the assessment are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S8-A
NA = C
A = $20.05/1
A = $20.05 per Parcel
Redlands Regular Meeting 06-07-2022 1341 of 1593
30 Annexation S8-B (Zone 3) - CRA 666 APN 0292-158-17
The one parcel in Annexation S8-B will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S8-B
NA = C
A = $40.10/1
A = $40.10 per Parcel
Annexation S8-C (Zone 3) - CRA 616
The portion of this property that was Annexation S8-C is no longer assessed.

Annexation S9-A (Zones 1 & 4) - Tract 15589 APN 0293-421-01 thru -45 The forty-five parcels in Annexation S9-A will receive an equal benefit assessment.

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-A
NA = C
A = $202.40/45
A = $4.50 per Parcel
Annexation S9-B (Zone 1) - MS 221, Parcel Map 14285 APN 0174-281-33, 34, 35, 37 The four parcels in Annexation S9-B will receive an equal benefit assessment. The calculation for the assessment follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-B
NA = C
A = $58.35/4
A = $14.59 per Parcel
Redlands Regular Meeting 06-07-2022 1342 of 1593
31 Annexation S9-C – there is no Annexation S9-C
Annexation S9-D (Zone 3) - CUP 617 APN 0292-033-13
The one parcel in Annexation S9-D will receive the entire benefit assessment. The calculation for the assessment follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-D
NA= C
A = $80.20/1
A = $80.20 per Parcel
Annexation S9-E (Zone 1) - CRA 670 APN 0292-157-20
The one parcel in Annexation S9-E will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-E
NA = C
A= $19.45/1
A = $19.45 per Parcel
Annexation S9-F (Zone 3) - CUP 629
The one parcel in Annexation S9-F will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-F
NA = C
A = $100.25/1
A = $100.25 per Parcel
Redlands Regular Meeting 06-07-2022 1343 of 1593
32 Annexation S10-A (Zones 1 & 3) - Tract 15040 APN 0174-631-01 thru -09, -11 thru - 35, -37 thru -58, -63, -64
The fifty-eight parcels in Annexation S10-A will each receive an equal benefit assessment.

The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N =Number of Parcels in Annexation S10-A
NA = C
A = $1,461.15/58
A = $25.19 per Parcel
Annexation S10-B (Zones 1 & 4) - Tract 15832 APN 0172-301-18 thru 22, 26 The six parcels in Annexation S10-B will each receive an equal benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-B
NA = C
A = $140.89/6
A = $23.48 per Parcel
Annexation S10-C (Zones 1, 3 & 4) - TR 15937 APN 0168-731-01 thru -25, APN 0168- 741-01 thru -78, APN 0168-751-01 thru -56
The one hundred fifty-nine parcels in Annexation S10-C will each receive an equal benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-C
NA = C
A = $2,722.64 /159
A = $17.12 per Parcel
Redlands Regular Meeting 06-07-2022 1344 of 1593
33 Annexation S10-D (Zone 1) - Tract 16015 APN 1212-021-01 thru -62 The sixty-two parcels in Annexation S10-D will each receive an equal benefit assessment.

The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-D
NA = C
A = $1,050.30/62
A = $16.94 per Parcel
Annexation S10-E (Zones 1 & 3) - Tract 16029 APN 0167-081-13 thru -45 The thirty-three parcels in Annexation S10-E will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $453.95/33
A = $13.76 per Parcel
Annexation S10-F (Zones 1 & 4) - Tract 16032 APN 0170-481-20 thru -34 The fifteen parcels in Annexation S10-F will each receive an equal benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-F
NA = C
A = $259.17 /15
A = $17.28 per Parcel
Redlands Regular Meeting 06-07-2022 1345 of 1593
34 Annexation S10-G (Zone 1) - Tract 16082 APN 0172-091-24 thru 36 The thirteen parcels in Annexation S1O-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-G
NA = C
A= $350.10/13
A = $26.93 per Parcel
Annexation S10-H (Zones 1 & 4) - Tract 16101 APN 0168-771-01 thru -50, APN 0168- 781-01 thru -34, APN 0168-791-01 thru -28, APN 0168-801-01 thru -38 The one hundred fifty parcels in Annexation S10-H will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-H
NA = C
A = $2,289.87/150
A = $15.27 per Parcel
Redlands Regular Meeting 06-07-2022 1346 of 1593
35 Annexation S10-I (Zones 1 & 4) - MS 253 (PM 15530) and MS 255 (PM 15617) APN 0292-153-28, -30 thru -43
The fifteen parcels in Annexation S10-I will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment/Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-I
NA=C
A = $435.80/22
A = $19.81 per UOB
Assessment for each Parcel in PM 15530 (except Parcel 2):

APN 0292-153-28, 30 thru 41
Parcel 1 - 3 UOB = $59.43
Parcel 3 - 1 UOB = $19.81
Parcel 4 - 3 UOB = $59.43
Parcel 5 - 1 UOB = $19.81
Parcel 6 - 1 UOB = $19.81
Parcel 7 - 1 UOB = $19.81
Parcel 8 - 1 UOB = $19.81
Parcel 9 - 1 UOB = $19.81
Parcel 10 - 1 UOB = $19.81
Parcel 11 - 1 UOB = $19.81
Parcel 12 - 4 UOB = $79.24
Parcel 13 - 1 UOB = $19.81
Parcel 14 - 1 UOB = $19.81
Assessment for each Parcel in PM 15530:

APN 0292-153-42, 43
Parcel 1 - 1 UOB = $19.81
Parcel 3 - 1 UOB = $19.81
Redlands Regular Meeting 06-07-2022 1347 of 1593
36 Annexation S10-J (Zone 4) - MS 252 (PM 15492) APN 0169-011-32 thru -35, -38, -39 The original five parcels in Annexation S10-J will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-J
NA = C
A = $147.21/5
A = $29.44 per Parcel for APN -32 thru -35
APN 0169-011-36 was split into APN 0169-011-38 and -39.

Therefore, A = $14.72 per Parcel for APN -38 and -39
Annexation S10-K (Zones 1 & 4) - CRA 720, PM 17658, APN 0292-154-22 thru -25 The four parcels in Annexation S7-K will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB
NA = C
A = $139.31/7
A = $19.45 per UOB (Zone 1)
A = $21.03 per UOB (Zone 4)
Assessment for each parcel:

Parcel 1 - Zone 1 - 2 UOB / Zone 4 - 2 UOB = $80.96
Parcel 2 - Zone 1 - 1 UOB = $19.45
Parcel 3 - Zone 1 - 1 UOB = $19.45
Parcel 4 - Zone 1 - 1 UOB = $19.45
Annexation S10-L – there is no Annexation S10-L
Redlands Regular Meeting 06-07-2022 1348 of 1593
37 Annexation S10-M (Zone 1) - CRA 679 - APN 0292-310-42 The one parcel will receive entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and incidental Expenses
N = Number of Parcels
NA = C
A = $19.45/1
A = $19.45 per Parcel
Annexation S10-N (Zone 3) - CUP 35R2 - APN 0173-251-21
The one parcel will receive entire benefit assessment. The calculations for the assessments are as follows:

A =Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $60.15/1
A = $60.15 per Parcel
Annexation S10-O (Zone 3) - CUP 355 Rev. 8 - APN 0172-121-10, 11, 14 The three parcels will receive an equal benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $80.20/3
A = $26.73 per Parcel
Redlands Regular Meeting 06-07-2022 1349 of 1593
38 Annexation S10-P (Zone 3) - CUP 543 - APN 0171-431-05 The one parcel will receive entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $120.30/1
A = $120.30 per Parcel
Annexation S10-Q (Zones 1 & 2) - MS 234 (PM 14891) - APN 0169·272-29, APN 0169- 281-45, 46
The three parcels will receive one UOB per 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:

A = Assessment per UOB
C = Cost of operation and maintenance to be assessed
N = Number of UOB
NA = C
A = $196.38/12
A = $16.37 per UOB
Assessment for Each Parcel
Parcel 29 - 4 UOB = $65.48
Parcel 45 - 6 UOB = $98.22
Parcel 46 - 2 UOB = $32.74
Redlands Regular Meeting 06-07-2022 1350 of 1593
39 Annexation S10-R (Zone 3) - MS 251 (PM 15414) APN 0176-014-16, 17 The two parcels will receive an equal benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $60.15/2
A = $30.08 per Parcel
Annexation S10-S (Zones 1 & 3) - Tract 14790-2 APN 0294-181-02 thru -15, APN 0294-191-01 thru -04, -06 thru -12, -16 thru -20,
APN 0294-201-09, -11, -13, -15, -19, -21, -27, -28,
APN 0294-211-02 thru -04, -06 thru -10, -12, -13
The forty-eight parcels in Annexation S10-S will each receive an equal benefit assessment.

The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $2,378.05/48
A = $49.54 per Parcel
Annexation S10-T (Zones 1 & 3) - Tract 14790-3 APN 0294-222-01 thru -12, APN 0294-232-01 thru -07, APN 0294-242-01 thru -06, APN 0294-252-01 thru -13, APN 0294-262-01 thru -13
The fifty-one parcels in Annexation S10-T will each receive an equal benefit assessment.

The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $1,842.70/51
A = $36.13 per Parcel
Redlands Regular Meeting 06-07-2022 1351 of 1593
40 Annexation S10-U (Zones 1, 3 & 4) - Tract 15532 APN 0168-271-13 thru -48 The thirty-six parcels in Annexation S10-U will each receive an equal benefit assessment.

The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $515.40/36
A = $14.32 per Parcel
Annexation S10-V (Zone 1) - CUP 652 - APN 0171-011-67
The one parcel will receive entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $19.45/1
A = $19.45 per Parcel
APN 0171-011-54 was the original Annexation 10-V. That parcel was merged with the parcel immediately to the east (APN 0171-011-45). The new parcel was assigned APN 0171-011-67.

Annexation S10-W (Zone 1) - MS 240 (PM 14912) - APN 0292-201-22 The one parcel will receive the entire benefit assessment. The calculations for the assessments are as follows:

A = Assessment per Parcel
C = Cost of Incidental Expenses
N = Number of Parcels
NA = C
A = $19.45/1
A = $19.45 per Parcel
This parcel has been subdivided and is not assessed.

Redlands Regular Meeting 06-07-2022 1352 of 1593
41 * * * * * * * * * * * *
The City Council will hold a public meeting on June 21, 2022 to determine the assessments based upon the costs for FY2022-2023 which are anticipated to be incurred by the City and which are to be recovered through assessments as required by the Landscaping and Lighting District Act of 1972.

Redlands Regular Meeting 06-07-2022 1353 of 1593
Redlands Regular Meeting 06-07-2022 1354 of 1593
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023
Redlands Regular Meeting 06-07-2022 1355 of 1593

APPENDIX A

CALCULATION OF MAINTENANCE AND INCIDENTAL COST TABLE
Redlands Regular Meeting 06-07-2022 1356 of 1593
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1357 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Original District Annexation S1-B Annexation S1-C Annexation S1-D Annexation S1-E Annexation S1-F Annexation S1-G Annexation S1-H Annexation S1-I Annexation S1-J Annexation S1-K Annexation S1-L Annexation S1-M Annexation S1-N Annexation S1-O Annexation S1-P Description PM 11917 PM 11755 CUP 617 MS 184 CUP 382 CRA 606 CRA 486 CUP 253 CRA 608 CUP 519 CUP 516 CUP 518 CUP 522 Tract 13947 CUP 521 CUP 605 Original
Parcels
APN 292-032-39
THRU 42
APN 293-172-16
THRU 18 APN 292-033-11
APN 167-231-19
THRU 21
APN 171-383-19
& 20 APN 169-131-33 APN 292-321-10 APN 169-411-07 APN 169-142-11 APN 171-331-04 APN 292-166-11 APN 169-053-12 APN 172-031-49 APN 174-621-01
THRU 35 APN 292-034-16
APN 169-182-02
THRU 04
Zone 3 4 4 3 3 1 4 4 3 3 4 3 3 1 3 1
Unit of
Benefit/Zone
Zone 1 UOB 0 0 0 0 0 1 0 0 0 0 0 0 0 35 0 2
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Zone 3 UOB 31 0 0 3 2 0 0 0 1 1 0 1 1 0 1 0
Zone 4 UOB 0 13 11 0 0 0 5 5 0 0 13 0 0 0 0 0

TOTAL UOB
per Zone 31 13 11 3 2 1 5 5 1 1 13 1 1 35 1 2
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:

Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ - $ - $ - $ - $ 20 $ - $ - $ - $ - $ - $ - $ - $ 713 $ - $ 41 Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Zone 3 $ 857 $ - $ - $ 83 $ 55 $ - $ - $ - $ 28 $ 28 $ - $ 28 $ 28 $ - $ 28 $ - Zone 4 $ - $ 390 $ 330 $ - $ - $ - $ 150 $ 150 $ - $ - $ 390 $ - $ - $ - $ - $ - SUBTOTAL $ 857 $ 390 $ 330 $ 83 $ 55 $ 20 $ 150 $ 150 $ 28 $ 28 $ 390 $ 28 $ 28 $ 713 $ 28 $ 41 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL

APPLIED
UOB &
EXPENSES $ 857 $ 390 $ 330 $ 83 $ 55 $ 20 $ 150 $ 150 $ 28 $ 28 $ 390 $ 28 $ 28 $ 713 $ 28 $ 41 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (235) $ (117) $ (99) $ (23) $ (15) $ (1) $ (45) $ (45) $ (8) $ (8) $ (117) $ (8) $ (8) $ (33) $ (8) $ (2)

BALANCE
TO LEVY $ 856.53 $ 390.39 $ 330.33 $ 82.89 $ 55.26 $ 20.38 $ 150.15 $ 150.15 $ 27.63 $ 27.63 $ 390.39 $ 27.63 $ 27.63 $ 713.30 $ 27.63 $ 40.76 Total # of
Parcels 4 3 1 3 2 1 1 1 1 1 1 1 1 35 1 3
Total Parcels
Levied 4 3 1 3 2 1 1 1 1 1 1 1 1 35 1 3
Total
Assessment
Allowable $ 621.55 $ 273.39 $ 231.33 $ 60.15 $ 40.10 $ 19.45 $ 105.15 $ 105.15 $ 20.05 $ 20.05 $ 273.39 $ 20.05 $ 20.05 $ 680.75 $ 20.05 $ 38.91 Redlands Regular Meeting 06-07-2022 1358 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S1-S Annexation S1-T Annexation S1-U Annexation S1-V Annexation S1-W Annexation S1-X Annexation S1-Y Annexation S2-A Annexation S2-B Annexation S2-D Annexation S2-F Annexation S2-H Annexation S3-A Annexation S3-B Annexation S3-C Annexation S3-D Description CUP 278 CUP 405 CRA 354 CRA 346 CRA 607 Tract 12461 PM 12022 PM 12330 PM 12940 Tract 14556 MS 196 CRA 615 CRA 517 CRA 628 CRA 624 CRA 305 Original
Parcels
APN 171-171-18,
22 & 23
Subsequently,S1-S
and S7-A
resubdivided.

Proportionate
assessments levied
to 0171-171-34 for
for S1-S APN 169-343-07
APN 292-182-30
& 31 APN 292-061-25 APN 292-156-21
APN 1212-191-60
THRU 79
APN 169-212-17
THRU 27
APN 292-153-24
THRU 27
APN 292-441-11
THRU 15
APN 176-441-18
THRU 27
APN 292-331-15
& 16 APN 292-157-31
APN 169-321-01
& 02 APN 292-310-07 APN 169-281-39 APN 167-271-61
Zone 3 3 4 Owned by County 3 1 3 3 3 1 3 4 3 1 3 3
Unit of
Benefit/Zone
Zone 1 UOB 0 0 0 0 0 20 0 0 0 17 0 0 0 1 0 0
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Zone 3 UOB 4 1 0 0 6 0 19 12 3 0 8 0 4 0 1 5
Zone 4 UOB 0 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0

TOTAL UOB
per Zone 4 1 2 0 6 20 19 12 3 17 8 1 4 1 1 5
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:

Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ - $ - $ - $ - $ 408 $ - $ - $ - $ 346 $ - $ - $ - $ 20 $ - $ - Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Zone 3 $ 111 $ 28 $ - $ - $ 166 $ - $ 525 $ 332 $ 83 $ - $ 221 $ - $ 111 $ - $ 28 $ 138 Zone 4 $ - $ - $ 60 $ - $ - $ - $ - $ - $ - $ - $ - $ 30 $ - $ - $ - $ - SUBTOTAL $ 111 $ 28 $ 60 $ - $ 166 $ 408 $ 525 $ 332 $ 83 $ 346 $ 221 $ 30 $ 111 $ 20 $ 28 $ 138 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL

APPLIED
UOB &
EXPENSES $ 111 $ 28 $ 60 $ - $ 166 $ 408 $ 525 $ 332 $ 83 $ 346 $ 221 $ 30 $ 111 $ 20 $ 28 $ 138 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (30) $ (8) $ (18) $ - $ (45) $ (19) $ (144) $ (91) $ (23) $ (16) $ (61) $ (9) $ (30) $ (1) $ (8) $ (38)

BALANCE
TO LEVY $ 110.52 $ 27.63 $ 60.06 $ - $ 165.78 $ 407.60 $ 524.97 $ 331.56 $ 82.89 $ 346.46 $ 221.04 $ 30.03 $ 110.52 $ 20.38 $ 27.63 $ 138.15 Total # of
Parcels 3 1 2 1 1 20 11 4 5 10 2 1 2 1 1 1
Total Parcels
Levied 3 1 2 0 1 20 11 4 5 10 2 1 2 1 1 1
Total
Assessment
Allowable $ 80.19 $ 20.05 $ 42.06 $ - $ 120.30 $ 389.00 $ 380.95 $ 240.60 $ 60.15 $ 330.70 $ 160.40 $ 21.03 $ 80.20 $ 19.45 $ 20.05 $ 100.25 Redlands Regular Meeting 06-07-2022 1359 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S3-E Annexation S3-F Annexation S3-G Annexation S3-H Annexation S3-J Annexation S4-A Annexation S4-B Annexation S4-C Annexation S4-D Annexation S4-E Annexation S4-F Annexation S4-G Annexation S4-H Annexation S4-I Annexation S5-B Annexation S5-C Description Tract 13575 CUP 550 CRA 623 CUP 542 MS 201 MS 213 MS 211 CUP 559 CUP 636 CRA 546 CRA 641 CRA 640 CUP 562 CUP 548 Tract 10179 CUP 574 Original
Parcels
APN 1212-701-01
THRU 27 APN 292-165-15 APN 292-381-08
APN 292-064-13,
17, 21 THRU 27 APN 171-341-33
APN 172-301-14
THRU 17
APN 292-201-36
& 37
Subsequently 36
became 38 APN 171-202-30 APN 169-043-14 APN 292-192-11 APN 292-310-36 APN 169-301-08,
10, 11 APN 292-064-17 APN 169-313-16
APN 167-861-37
THRU 54; APN
167-851-39
THRU 56 APN 171-202-33
Zone 1 3 & 4 1 4 3 4 3 3 1 4 1 4 See ANX S3-H 1 1 1
Unit of
Benefit/Zone
Zone 1 UOB 36 0 1 0 0 0 0 0 3 0 2 0 0 4 26 1
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Zone 3 UOB 0 9 0 0 4 0 5 2 0 0 0 0 0 0 0 0
Zone 4 UOB 0 2 0 27 0 3 0 0 0 11 0 1 0 0 0 0

TOTAL UOB
per Zone 36 11 1 27 4 3 5 2 3 11 2 1 0 4 26 1
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:

Unit of Benefit
Assessment/
Zone
Zone 1 $ 734 $ - $ 20 $ - $ - $ - $ - $ - $ 61 $ - $ 41 $ - $ - $ 82 $ 530 $ 20 Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Zone 3 $ - $ 249 $ - $ - $ 111 $ - $ 138 $ 55 $ - $ - $ - $ - $ - $ - $ - $ - Zone 4 $ - $ 60 $ - $ 811 $ - $ 90 $ - $ - $ - $ 330 $ - $ 30 $ - $ - $ - $ - SUBTOTAL $ 734 $ 309 $ 20 $ 811 $ 111 $ 90 $ 138 $ 55 $ 61 $ 330 $ 41 $ 30 $ - $ 82 $ 530 $ 20 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL

APPLIED
UOB &
EXPENSES $ 734 $ 309 $ 20 $ 811 $ 111 $ 90 $ 138 $ 55 $ 61 $ 330 $ 41 $ 30 $ - $ 82 $ 530 $ 20 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (34) $ (86) $ (1) $ (243) $ (30) $ (27) $ (38) $ (15) $ (3) $ (99) $ (2) $ (9) $ - $ (4) $ (24) $ (1)

BALANCE
TO LEVY $ 733.68 $ 308.73 $ 20.38 $ 810.81 $ 110.52 $ 90.09 $ 138.15 $ 55.26 $ 61.14 $ 330.33 $ 40.76 $ 30.03 $ - $ 81.52 $ 529.88 $ 20.38 Total # of
Parcels 27 1 1 9 1 4 2 1 1 1 1 3 1 1 36 1
Total Parcels
Levied 27 1 1 9 1 4 2 1 1 1 1 3 0 1 36 1
Total
Assessment
Allowable $ 700.11 $ 222.51 $ 19.45 $ 567.81 $ 80.20 $ 63.10 $ 100.25 $ 40.10 $ 58.35 $ 231.33 $ 38.90 $ 21.03 $ - $ 77.80 $ 505.80 $ 19.45 Redlands Regular Meeting 06-07-2022 1360 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S5-D Annexation S5-E Annexation S6-A Annexation S6-B Annexation S7-A Annexation S7-B Annexation S7-C Annexation S7-D Annexation S7-E Annexation S7-F Annexation S7-G Annexation S7-H Annexation S8-A Annexation S8-B Annexation S9-A Annexation S9-B Description CRA 642 MS 216-B CRA 648 CUP 581 MS 228 CRA 639 CUP 602 CUP 590 CUP 607 CUP 577 CUP 541 Tract 14790-1 CUP 584 CRA 666 Tract 15589 MS 221 Original
Parcels APN 292-154-12
APN 174-021-41
& 42 APN 292-157-16 APN 171-203-13
APN 171-161-14
& 15
Subsequently, S1-
S and S7-H were
resubdivided.

Proportionate
assessments levied
to 0171-161-17 for
for S7-A APN 292-152-39 APN 292-063-48 APN 171-332-30 APN 167-101-13 APN 1212-041-01 APN 174-261-15 APN 176-521-01
THRU 13, 18
THRU 23, 27
THRU 32, APN
176-531-01 THRU
03, 07 THRU 09,
12 THRU 14, 18,
20 THRU 25
Subsequently,
0176-531-14 was
changed to -26 APN 172-121-03
APN 292-158-03
Subsequently, 03
was changed to 17
APN 293-421-01
THRU 45
APN 174-281-33,
34, 35, 37
Zone 3 1 4 1 3 3 4 1 1 & 3 1 1 2 3 3 1 & 4 1
Unit of
Benefit/Zone
Zone 1 UOB 0 2 0 2 0 0 0 2 4 4 8 0 0 0 5 3
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 125 0 0 0 0
Zone 3 UOB 5 0 0 0 10 5 0 0 6 0 0 0 1 2 0 0
Zone 4 UOB 0 0 9 0 0 0 2 0 0 0 0 0 0 0 5 0

TOTAL UOB
per Zone 5 2 9 2 10 5 2 2 10 4 8 125 1 2 10 3
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:

Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ 41 $ - $ 41 $ - $ - $ - $ 41 $ 82 $ 82 $ 163 $ - $ - $ - $ 102 $ 61 Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,061 $ - $ - $ - $ - Zone 3 $ 138 $ - $ - $ - $ 276 $ 138 $ - $ - $ 166 $ - $ - $ - $ 28 $ 55 $ - $ - Zone 4 $ - $ - $ 270 $ - $ - $ - $ 60 $ - $ - $ - $ - $ - $ - $ - $ 150 $ - SUBTOTAL $ 138 $ 41 $ 270 $ 41 $ 276 $ 138 $ 60 $ 41 $ 247 $ 82 $ 163 $ 1,061 $ 28 $ 55 $ 252 $ 61 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL

APPLIED
UOB &
EXPENSES $ 138 $ 41 $ 270 $ 41 $ 276 $ 138 $ 60 $ 41 $ 247 $ 82 $ 163 $ 1,061 $ 28 $ 55 $ 252 $ 61 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (38) $ (2) $ (81) $ (2) $ (76) $ (38) $ (18) $ (2) $ (49) $ (4) $ (7) $ 599 $ (8) $ (15) $ (50) $ (3)

BALANCE
TO LEVY $ 138.15 $ 40.76 $ 270.27 $ 40.76 $ 276.30 $ 138.15 $ 60.06 $ 40.76 $ 247.30 $ 81.52 $ 163.04 $ 1,061.25 $ 27.63 $ 55.26 $ 252.05 $ 61.14 Total # of
Parcels 1 2 1 1 2 1 1 1 1 1 1 40 1 1 45 4
Total Parcels
Levied 1 2 1 1 2 1 1 1 1 1 1 40 1 1 45 4
Total
Assessment
Allowable $ 100.25 $ 38.90 $ 189.27 $ 38.90 $ 200.50 $ 100.25 $ 42.06 $ 38.90 $ 198.10 $ 77.80 $ 155.60 $ 1,660.00 $ 20.05 $ 40.10 $ 202.50 $ 58.36 Redlands Regular Meeting 06-07-2022 1361 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S9-D Annexation S9-E Annexation S9-F Annexation S10-A Annexation S10-B Annexation S10-C Annexation S10-D Annexation S10-E Annexation S10-F Annexation S10-G Annexation S10-H Annexation S10-I Annexation S10-J Annexation S10-K Annexation S10-M Description CUP 617 CRA 670 CUP 629 Tract 15040 Tract 15832 Tract 15937 Tract 16015 Tract 16029 Tract 16032 Tract 16082 Tract 16101 MS 253, 255 (PM
15530, 15617 MS 252 (PM 15492 CRA 720 CRA 679
Original
Parcels APN 292-033-13 APN 292-157-20 APN 1212-431-02
APN 174-631-01
THRU 09, 11
THRU 35, 37
THRU 58, 63 & 64
APN 172-301-18
THRU 22, 26
APN 168-731-01
THRU 25, APN
168-741-01 THRU
78, APN 168-751-
01 THRU 56
APN 1212-021-01
THRU 62
APN 167-081-13
THRU 45
APN 170-481-20
THRU 34
APN 172-091 24
THRU 36
APN 168-771-01 THRU
50, APN 168-781-01
THRU 34, APN 168-791-
01 THRU 28, APN168-
801-01 THRU 38
APN 292-153-28,
30 THRU 43
APN 169-011-32
THRU 35, 38 & 39
APN 292-154-22
THRU 25 APN 292-310-42
Zone 3 1 3 1 & 3 1 & 4 1, 3, & 4 1 1 & 3 1 & 4 1 1 & 4 1 & 4 4 1 & 4 1 Unit of
Benefit/Zone
Zone 1 UOB 0 1 0 71 4 95 54 12 9 18 108 17 0 5 1
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Zone 3 UOB 4 0 5 4 0 30 0 11 0 0 0 0 0 0 0
Zone 4 UOB 0 0 0 0 3 13 0 0 4 0 9 5 7 2 0

TOTAL UOB
per Zone 4 1 5 75 7 138 54 23 13 18 117 22 7 7 1
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:

Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ 20 $ - $ 1,447 $ 82 $ 1,936 $ 1,101 $ 245 $ 183 $ 367 $ 2,201 $ 346 $ - $ 102 $ 20 Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Zone 3 $ 111 $ - $ 138 $ 111 $ - $ 829 $ - $ 304 $ - $ - $ - $ - $ - $ - $ - Zone 4 $ - $ - $ - $ - $ 90 $ 390 $ - $ - $ 120 $ - $ 270 $ 150 $ 210 $ 60 $ - SUBTOTAL $ 111 $ 20 $ 138 $ 1,558 $ 172 $ 3,155 $ 1,101 $ 548 $ 304 $ 367 $ 2,471 $ 497 $ 210 $ 162 $ 20 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL

APPLIED
UOB &
EXPENSES $ 111 $ 20 $ 138 $ 1,558 $ 172 $ 3,155 $ 1,101 $ 548 $ 304 $ 367 $ 2,471 $ 497 $ 210 $ 162 $ 20 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (30) $ (1) $ (38) $ (96) $ (31) $ (433) $ (50) $ (94) $ (44) $ (17) $ (181) $ (61) $ (63) $ (23) $ (1)

BALANCE
TO LEVY $ 110.52 $ 20.38 $ 138.15 $ 1,557.50 $ 171.61 $ 3,155.39 $ 1,100.52 $ 548.49 $ 303.54 $ 366.84 $ 2,471.31 $ 496.61 $ 210.21 $ 161.96 $ 20.38 Total # of
Parcels 1 1 1 58 6 159 62 33 15 13 150 15 6 4 1
Total Parcels
Levied 1 1 1 58 6 159 62 33 15 13 150 15 6 4 1
Total
Assessment
Allowable $ 80.20 $ 19.45 $ 100.25 $ 1,461.02 $ 140.88 $ 2,722.08 $ 1,050.28 $ 454.08 $ 259.20 $ 350.09 $ 2,290.50 $ 435.82 $ 147.20 $ 139.31 $ 19.45 Redlands Regular Meeting 06-07-2022 1362 of 1593

APPENDIX A

COST TABLE

ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S10-N Annexation S10-O Annexation S10-P Annexation S10-Q Annexation S10-R Annexation S10-S Annexation S10-T Annexation S10-U Annexation S10-V Annexation S10-W TOTALS Description CUP 35R CUP 355 REV. 8 CUP 543 MS 234 (PM 15414) MS 251 (PM 15414) Tract 14790-2 Tract 14790-3 Tract 15532 CUP 652 MS 240 Original
Parcels APN 173-251-21
APN 172-121-10, 11,
14 APN 171-431-02
Subsequently, 02
was changed to 05
APN 169-272-29,
APN 169-281-45,
46 APN 176-014-16 &
17 APN 294-181-02 THRU 15,
APN 294-191-01 THRU 4, 6
THRU 12, 16 THRU 20,
APN 294-201-09, 11, 13, 15,
19, 21, 27, 28, APN 294-211-
02 THRU 04, 06 THRU 10,
12, 13
APN 294-222-01 THRU 12,
APN 294-232-01 THRU 07,
APN 294-242-01 THRU 06,
APN 294-252-01 THRU 13,
APN 294-262-01 THRU 13
APN 168-271-13
THRU 48 APN 171-011-54 APN 292-201-22
Zone 3 3 3 1 & 2 3 1 & 3 1 & 3 1, 3 & 4 1 1
Unit of
Benefit/Zone
Zone 1 UOB 0 0 0 6 0 80 70 18 1 0 749
Zone 2 UOB 0 0 0 6 0 0 0 0 0 0 131
Zone 3 UOB 3 4 6 0 3 41 24 3 0 0 291
Zone 4 UOB 0 0 0 0 0 0 0 5 0 0 158

TOTAL UOB
per Zone 3 4 6 12 3 121 94 26 1 0 1329
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Calculation of
Current
Assessments:

Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ - $ - $ 122 $ - $ 1,630 $ 1,427 $ 367 $ 20 $ - $ 15,265 Zone 2 $ - $ - $ - $ 51 $ - $ - $ - $ - $ - $ - $ 1,112 Zone 3 $ 83 $ 111 $ 166 $ - $ 83 $ 1,133 $ 663 $ 83 $ - $ - $ 8,040.33 Zone 4 $ - $ - $ - $ - $ - $ - $ - $ 150 $ - $ - $ 4,745 SUBTOTAL $ 83 $ 111 $ 166 $ 173 $ 83 $ 2,763 $ 2,090 $ 600 $ 20 $ - $ 29,162 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
TOTAL

APPLIED
UOB &
EXPENSES $ 83 $ 111 $ 166 $ 173 $ 83 $ 2,763 $ 2,090 $ 600 $ 20 $ - $ 29,162 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
General Fund
Contribution $ (23) $ (30) $ (45) $ 23 $ (23) $ (385) $ (247) $ (84) $ (1) $ - $ (3,697)

BALANCE
TO LEVY $ 82.89 $ 110.52 $ 165.78 $ 173.22 $ 82.89 $ 2,763.23 $ 2,089.72 $ 599.88 $ 20.38 $ - $ 29,161.88 Total # of
Parcels 1 3 1 3 2 48 51 36 1 1 993
Total Parcels
Levied 1 3 1 3 2 48 51 36 1 0 990
Total
Assessment
Allowable $ 60.15 $ 80.19 $ 120.30 $ 196.44 $ 60.16 $ 2,377.92 $ 1,842.63 $ 515.52 $ 19.45 $ - $ 25,465.25 Redlands Regular Meeting 06-07-2022 1363 of 1593

APPENDIX B

DISTRICT DIAGRAM
Redlands Regular Meeting 06-07-2022 1364 of 1593
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023

THIS PAGE INTENTIONALLY LET BLANK
Redlands Regular Meeting 06-07-2022 1365 of 1593

CITY OF REDLANDS
STREET LIGHT DISTRICT NO. 1

APPENDIX B - ASSESSMENT DIAGRAMS
Redlands Regular Meeting 06-07-2022 1366 of 1593
2 Abbreviations
APN – Assessor’s Parcel Number
CRA – Commission Review and Approval
CUP – Conditional Use Permit
MS – Minor Subdivision
PM – Parcel Map
TM – Tract Map
General comments
Each annexation has its own diagram.

North is up unless notated otherwise.

The assessor’s parcel numbers are shown as a 9 digit number.

A dark red line delineates the boundary of each annexation.

A shaded background is typically used to indicate parcels within the Street Lighting District.

Annexation #s
Initial District
S1-A thru S1-Y
S2-A thru S2-H
S3-A thru S3-I
S4-A thru S4-I
S5-A thru S5-E
S6-A thru S6-B
S7-A thru S7-H
S8-A thru S8-C
S9-A thru S9-F
S10-A thru S10-W
Redlands Regular Meeting 06-07-2022 1367 of 1593
1 Initial District
Parcel Map No. 11917
Redlands Regular Meeting 06-07-2022 1368 of 1593
2 Annexation S1-A
Parcel Map No. 12450
These parcels are not assessed.

Redlands Regular Meeting 06-07-2022 1369 of 1593
3 Annexation S1-B
Parcel Map No. 11755
Redlands Regular Meeting 06-07-2022 1370 of 1593
4 Annexation S1-C
CUP 617
Redlands Regular Meeting 06-07-2022 1371 of 1593
5 Annexation S1-D
MS 184, Parcel Map No. 12300
Redlands Regular Meeting 06-07-2022 1372 of 1593
6 Annexation S1-E
CUP 382
Redlands Regular Meeting 06-07-2022 1373 of 1593
7 Annexation S1-F
CRA 606
Redlands Regular Meeting 06-07-2022 1374 of 1593
8 Annexation S1-G
CRA 486
Note: The boundary shown in red was the original parcel for Annexation S1-G.

The lot boundary was modified so the entire parcel is shown as part of the Street Light District.

Redlands Regular Meeting 06-07-2022 1375 of 1593
9 Annexation S1-H
CUP 253
Redlands Regular Meeting 06-07-2022 1376 of 1593
10 Annexation S1-I
CRA 608
Redlands Regular Meeting 06-07-2022 1377 of 1593
11 Annexation S1-J
CUP 519
Redlands Regular Meeting 06-07-2022 1378 of 1593
12 Annexation S1-K
CUP 516
Redlands Regular Meeting 06-07-2022 1379 of 1593
13 Annexation S1-L
CUP 518
Redlands Regular Meeting 06-07-2022 1380 of 1593
14 Annexation S1-M
CUP 522
Redlands Regular Meeting 06-07-2022 1381 of 1593
15 Annexation S1-N
Tract 13947
Redlands Regular Meeting 06-07-2022 1382 of 1593
16 Annexation S1-O
CUP 521
Redlands Regular Meeting 06-07-2022 1383 of 1593
17 Annexation S1-P
CUP 605
Redlands Regular Meeting 06-07-2022 1384 of 1593
18 Annexation S1-Q
MS 183 - Parcel Map 12087, City Hall
Redlands Regular Meeting 06-07-2022 1385 of 1593
19 Annexation S1-R
Parcel Map 11904
Redlands Regular Meeting 06-07-2022 1386 of 1593
20 Annexation S1-S
CUP 278
See comments for Annexation S7-A
Redlands Regular Meeting 06-07-2022 1387 of 1593
21 Annexation S1-T
CUP 405
Redlands Regular Meeting 06-07-2022 1388 of 1593
22 Annexation S1-U
CRA 354, Parcel Map 3131
Redlands Regular Meeting 06-07-2022 1389 of 1593
23 Annexation S1-V
CRA 346
Redlands Regular Meeting 06-07-2022 1390 of 1593
24 Annexation S1-W
CRA 607
Redlands Regular Meeting 06-07-2022 1391 of 1593
25 Annexation S1-X
Tract 12461
Redlands Regular Meeting 06-07-2022 1392 of 1593
26 Annexation S1-Y
Parcel Map 12022
Redlands Regular Meeting 06-07-2022 1393 of 1593
27 Annexation S2-A
Parcel Map 12330
Redlands Regular Meeting 06-07-2022 1394 of 1593
28 Annexation S2-B
Parcel Map 12940
Redlands Regular Meeting 06-07-2022 1395 of 1593
29 Annexation S2-C
This Annexation has been removed. It was a duplicate of Annexation S1-D.

Redlands Regular Meeting 06-07-2022 1396 of 1593
30 Annexation S2-D
Tract Map 14556
Redlands Regular Meeting 06-07-2022 1397 of 1593
31 Annexation S2-E
CRA 611
This parcel is not assessed.

Redlands Regular Meeting 06-07-2022 1398 of 1593
32 Annexation S2-F
MS 196
Redlands Regular Meeting 06-07-2022 1399 of 1593
33 Annexation S2-G
Parcel Map 11189
Redlands Regular Meeting 06-07-2022 1400 of 1593
34 Annexation S2-H
CRA 615
Redlands Regular Meeting 06-07-2022 1401 of 1593
35 Annexation S3-A
CRA 517
Redlands Regular Meeting 06-07-2022 1402 of 1593
36 Annexation S3-B
CRA 628
Redlands Regular Meeting 06-07-2022 1403 of 1593
37 Annexation S3-C
CRA 624
Redlands Regular Meeting 06-07-2022 1404 of 1593
38 Annexation S3-D
CUP 532, CRA 305
Redlands Regular Meeting 06-07-2022 1405 of 1593
39 Annexation S3-E
Tract 13575
APN 1212-201-01 thru -27
Redlands Regular Meeting 06-07-2022 1406 of 1593
40 Annexation S3-F
CUP 550
Redlands Regular Meeting 06-07-2022 1407 of 1593
41 Annexation S3-G
CRA 623
Redlands Regular Meeting 06-07-2022 1408 of 1593
42 Annexation S3-H
CUP 542, Parcel Map 13542
Redlands Regular Meeting 06-07-2022 1409 of 1593
43 Annexation S3-I
There is no Annexation S3-I
Redlands Regular Meeting 06-07-2022 1410 of 1593
44 Annexation S3-J
CUP 314, CUP 324, CUP 383
Redlands Regular Meeting 06-07-2022 1411 of 1593
45 Annexation S4-A
MS 213, Parcel Map 13978
Redlands Regular Meeting 06-07-2022 1412 of 1593
46 Annexation S4-B
MS 211
Redlands Regular Meeting 06-07-2022 1413 of 1593
47 Annexation S4-C
CUP 559
Redlands Regular Meeting 06-07-2022 1414 of 1593
48 Annexation S4-D
CRA 636
Redlands Regular Meeting 06-07-2022 1415 of 1593
49 Annexation S4-E
CRA 546
Redlands Regular Meeting 06-07-2022 1416 of 1593
50 Annexation S4-F
CRA 641 – originally two parcels that have been combined into a single parcel.

Redlands Regular Meeting 06-07-2022 1417 of 1593
51 Annexation S4-G
CRA 640
Redlands Regular Meeting 06-07-2022 1418 of 1593
52 Annexation S4-H
CUP 562
Redlands Regular Meeting 06-07-2022 1419 of 1593
53 Annexation S4-I
CUP 548
Redlands Regular Meeting 06-07-2022 1420 of 1593
54 Annexation S5-A
CRA 637
Redlands Regular Meeting 06-07-2022 1421 of 1593
55 Annexation S5-B
Tract Map 10179
APN 0167-851-39 thru -56
APN 0167-861-37 thru -54
Redlands Regular Meeting 06-07-2022 1422 of 1593
56 Annexation S5-C
CUP 574
Redlands Regular Meeting 06-07-2022 1423 of 1593
57 Annexation S5-D
CRA 642
Redlands Regular Meeting 06-07-2022 1424 of 1593
58 Annexation S5-E
Parcel Map 14090
Redlands Regular Meeting 06-07-2022 1425 of 1593
59 Annexation S6-A
CRA 648
Redlands Regular Meeting 06-07-2022 1426 of 1593
60 Annexation S6-B
CUP 581
Redlands Regular Meeting 06-07-2022 1427 of 1593
61 Annexation S7-A
MS 228
Annexation S7-A was originally APN 0171-161-13 and was then changed to APN 0171-161-14 and -15. Annexation S1-S was originally APN 0171-171-18, -22, and -23. Assessments for Annexation S7-A and S1-S were combined and then adjusted proportionately. New APNs for both annexations are 0171-161-17 and 0171-171-34. Assessment spread proportionately. 4/20/2020 Redlands Regular Meeting 06-07-2022 1428 of 1593
62 Annexation S7-B
CRA 639
Redlands Regular Meeting 06-07-2022 1429 of 1593
63 Annexation S7-C
CUP 602
Redlands Regular Meeting 06-07-2022 1430 of 1593
64 Annexation S7-D
CUP 590
The east half of the property was the original Annexation S7-D when it was a separate parcel.

Redlands Regular Meeting 06-07-2022 1431 of 1593
65 Annexation S7-E
CUP 607
Redlands Regular Meeting 06-07-2022 1432 of 1593
66 Annexation S7-F
CUP 577
Redlands Regular Meeting 06-07-2022 1433 of 1593
67 Annexation S7-G
CUP 541
Redlands Regular Meeting 06-07-2022 1434 of 1593
68 Annexation S7-H
Tract 14790-1
APN 0176-521-01 thru -13, -18 thru -23, -27 thru -32
APN 0176-531-01 thru -03, -07 thru -09, -12, -13, -18, -20 thru -22, -24 thru -26 Redlands Regular Meeting 06-07-2022 1435 of 1593
69 Annexation S8-A
CUP 584
Redlands Regular Meeting 06-07-2022 1436 of 1593
70 Annexation S8-B
CRA 666
Redlands Regular Meeting 06-07-2022 1437 of 1593
71 Annexation S8-C, CUP 616
The portion of this parcel that was Annexation S-8C is no longer assessed.

Redlands Regular Meeting 06-07-2022 1438 of 1593
72 Annexation S9-A
Tract 15589
Assessor’s Parcel Numbers
0293-421-01 thru -45
Redlands Regular Meeting 06-07-2022 1439 of 1593
73 Annexation S9-B
MS 221, Parcel Map 14285
Redlands Regular Meeting 06-07-2022 1440 of 1593
74 Annexation S9-C
There is no Annexation S9-C.

Redlands Regular Meeting 06-07-2022 1441 of 1593
75 Annexation S9-D
CUP 617
Redlands Regular Meeting 06-07-2022 1442 of 1593
76 Annexation S9-E
CRA 670
Redlands Regular Meeting 06-07-2022 1443 of 1593
77 Annexation S9-F

CUP 629
Boundary of area of original annexation is shown. That parcel has since been incorporated into the larger parcel.

Redlands Regular Meeting 06-07-2022 1444 of 1593
78 Annexation S10-A
Tract 15040
APN 174-631-01 thru -09, -11 thru -35
APN 174-631-37 thru -58
APN 0174-631-63, -64
Redlands Regular Meeting 06-07-2022 1445 of 1593
79 Annexation S10-B
Tract 15832
Redlands Regular Meeting 06-07-2022 1446 of 1593
80 Annexation S10-C
Tract 15937
APN 0168-731-01 thru -25
APN 0168-741-01 thru -78
APN 0168-751-01 thru -56
Redlands Regular Meeting 06-07-2022 1447 of 1593
81 Annexation S10-D
Tract 16015
APN 168-761-01 thru 168-761-62
Redlands Regular Meeting 06-07-2022 1448 of 1593
82 Annexation S10-E
Tract 16029
APN 167-081-13 thru 167-081-45
Redlands Regular Meeting 06-07-2022 1449 of 1593
83 Annexation S10-F
Tract 16032
Redlands Regular Meeting 06-07-2022 1450 of 1593
84 Annexation S10-G
Tract 16082
Redlands Regular Meeting 06-07-2022 1451 of 1593
85 Annexation S10-H
Tract 16101
APN 168-771-01 thru -50
APN 168-761-01 thru -34
APN 168-791-01 thru -28
APN 168-801-01 thru -38
Redlands Regular Meeting 06-07-2022 1452 of 1593
86 Annexation S10-I
Parcel Map 15530 and Parcel Map 15617
Redlands Regular Meeting 06-07-2022 1453 of 1593
87 Annexation S10-J
Parcel Map 15492
Redlands Regular Meeting 06-07-2022 1454 of 1593
88 Annexation S10-K
CRA 720
Redlands Regular Meeting 06-07-2022 1455 of 1593
89 Annexation S10-L
There is no Annexation S10-L
Redlands Regular Meeting 06-07-2022 1456 of 1593
90 Annexation S10-M
CRA 679
Redlands Regular Meeting 06-07-2022 1457 of 1593
91 Annexation S10-N
CUP 35, Rev. 2
Redlands Regular Meeting 06-07-2022 1458 of 1593
92 Annexation S10-O
CUP 355, Rev 8
Redlands Regular Meeting 06-07-2022 1459 of 1593
93 Annexation S10-P
CUP 543
Redlands Regular Meeting 06-07-2022 1460 of 1593
94 Annexation S10-Q
MS 234, Parcel Map 14891
Redlands Regular Meeting 06-07-2022 1461 of 1593
95 Annexation S10-R
MS 251, Parcel Map 15414
Redlands Regular Meeting 06-07-2022 1462 of 1593
96 Annexation S10-S
Tract 14790-2
APN 0294-181-02 thru -15
APN 0294-191-01 thru -04, -06 thru -12, -16 thru -20
APN 0294-201-09, -11, -13, -15, -19, -21, -27, -28
APN 0294-211-02 thru -04, -06 thru -10, -12, -13
Redlands Regular Meeting 06-07-2022 1463 of 1593
97 Annexation S10-T
Tract 14790-3
APN 0294-222-01 thru -12
APN 0294-232-01 thru -07
APN 0294-242-01 thru -06
APN 0294-252-01 thru -13
APN 0294-262-01 thru -13
Redlands Regular Meeting 06-07-2022 1464 of 1593
98 Annexation S10-U
Tract 15532
Redlands Regular Meeting 06-07-2022 1465 of 1593
99 Annexation S10-V
CUP 652
APN 0171-011-54 was the original Annexation 10-V. That parcel was merged with the parcel immediately to the east (APN 0171-011-45). The new parcel was assigned APN 0171-011-67.

Redlands Regular Meeting 06-07-2022 1466 of 1593
100
Annexation S10-W
MS 240
Original APN 0292-201-22 has been subdivided into a condo complex.

There is no assessment for Annexation S10-W
Redlands Regular Meeting 06-07-2022 1467 of 1593
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023

APPENDIX C

RESOLUTIONS
Redlands Regular Meeting 06-07-2022 1468 of 1593
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1469 of 1593

CITY OF REDLANDS
STREET LIGHT DISTRICT NO. 1
APPENDIX C – RESOLUTIONS
Resolution No 8294 – Institute proceedings and appointment of engineer Resolution No 8295 – Preliminary approval of engineer’s report Resolution No 8296 – Declaring intention to levy assessments Resolution No 8297 – Confirming a diagram and assessments Redlands Regular Meeting 06-07-2022 1470 of 1593
This page intentionally left blank
Redlands Regular Meeting 06-07-2022 1471 of 1593
RESOLUTION NO. 8294

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS

INSTITUTING PROCEEDINGS FOR THE CONTINUED LEVY OF

ASSESSMENTS, APPOINTING AN ASSESSMENT ENGINEER, AND

ORDERING THE PREPARATION OF AN ENGINEER'S REPORT IN THE MATTER OF STREET LIGHTING DISTRICT NO. 1 AND LANDSCAPE
MAINTENANCE DISTRICT NO. 1
WHEREAS, the City Council of the City of Redlands (this “City Council”) has determined that the public interest, convenience and necessity requires the installation, operation and maintenance of a street lighting system and other facilities as set forth in Section 22525 of the California Streets and Highways Code; and
WHEREAS, it has been determined by the City Council of the City of Redlands (this “City Council”), that the public interest, convenience and necessity requires the maintenance of landscaping as set forth in Section 22525 of the California Streets and Highways Code; and WHEREAS, this City Council has formed Redlands’ Street Lighting District No. 1 to pay the costs associated with the installation, operation and maintenance of such street lighting system and other facilities; and
WHEREAS, this City Council has formed Redlands’ Landscape Maintenance District No. 1 to pay the costs for the maintenance such landscaping; and
WHEREAS, it is the desire of this City Council to initiate proceedings and order the preparation of an engineer’s report to levy assessments for fiscal year 2022-2023 upon properties located within Street Lighting District No. 1 and Landscape Maintenance District No. 1; and WHEREAS, this City Council further desires to appoint Redlands’ Engineering Manager, Goutam Dobey, RCE No. 75646, as the "Assessment Engineer" for Street Lighting District No. 1 and Landscape Maintenance District No. 1;
NOW, THEREFORE, the City Council of the City of Redlands does hereby find, determine and resolve as follows:

Section 1. That the public interest, convenience and necessity requires the continued levy of assessments within Street Lighting District No. 1 for the purpose of installing, operating and maintaining street lights and associated facilities as authorized by Section 22620 of the California Streets and Highways Code and in compliance with Article XIIID, and Section 19 of Article XVI, of the California Constitution.

Section 2. That the public interest, convenience and necessity requires the continued levy of assessments within Landscape Maintenance District No. 1 for the purpose of maintaining landscaping and improvements as authorized by Section 22620 of the California Streets and Redlands Regular Meeting 06-07-2022 1472 of 1593
Highways Code and in compliance with the requirements of Article XIIID and Section 19 of Article XVI of the California Constitution.

Section 3. That the properties to be assessed for the installation, operation and maintenance of the street lighting facilities shall be those properties located within the boundaries of Street Lighting District No. 1.

Section 4. That the properties to be assessed for the maintenance and operation of the landscaping and improvements shall be those properties located within the boundaries of Landscape Maintenance District No. 1.

Section 5. That the proceedings for the continued levy of assessments within Street Lighting District No. 1 and Landscape Maintenance District No. 1 shall be conducted in accordance the with provisions of Division 15 of the California Streets and Highways Code (the Landscaping and Lighting Act of 1972) and in compliance with the requirements of Article XIIID, and Section 19 of Article XVI, of the California Constitution.

Section 6. That Redlands’ Engineering Manager, Goutam Dobey, RCE No. 75646, having an office located at 35 Cajon Street, Suite 15A, Redlands, California, is hereby appointed “Assessment Engineer” and shall have the authority conferred upon the Assessment Engineer by the Landscaping and Lighting Act of 1972.

Section 7. That the Assessment Engineer is hereby ordered to prepare a report in accordance with the Landscaping and Lighting Act of 1972.

ADOPTED, SIGNED AND APPROVED this 3rd day of May, 2022. ______________________________
Paul T. Barich, Mayor
ATTEST:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1473 of 1593
I, Jeanne Donaldson, City Clerk of the City of Redlands, do hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting thereof, held on the 3rd day of May, 2022 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAINED:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1474 of 1593
This page intentionally left blank.

Redlands Regular Meeting 06-07-2022 1475 of 1593
RESOLUTION NO. 8295

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS GIVING PRELIMINARY APPROVAL OF THE ENGINEER'S REPORTS FOR FISCAL YEAR 2022- 2023 FOR STREET LIGHTING DISTRICT NO. 1 AND LANDSCAPE MAINTENANCE DISTRICT NO. 1
WHEREAS, the City Council of the City of Redlands (the “City Council”) has heretofore determined that the public interest, convenience and necessity require the maintenance and operation of street lighting and appurtenant facilities, as set forth in Section 22525 of the Streets and Highways Code, within the incorporated boundaries of the City of Redlands; and WHEREAS, the City Council has heretofore determined that the public interest, convenience and necessity require the maintenance of landscape and irrigation facilities set forth in Section 22525 of the Streets and Highways Code, State of California, within the incorporated boundaries of the City of Redlands; and
WHEREAS, Goutam Dobey, City of Redlands’ Engineering Manager, 35 Cajon Street, Suite 15A, Redlands, California, has been appointed “Assessment Engineer” with all provisions of Part 2 of Division 15 of the Streets and Highways Code applicable to the Engineer being applied to the “Assessment Engineer;” and
WHEREAS, Sections 22622 and 22623 of the Streets and Highways Code require that an Engineer's Report be prepared and filed annually, specifying the assessments to be levied against the benefitting properties within the City’s Street Lighting District No. 1 and Landscape Maintenance District No. 1; and
WHEREAS, the City of Redlands Engineering Manager, as the Assessment Engineer, has prepared and filed with the City Clerk reports in writing as required by the Landscaping and Lighting Act of 1972 and in compliance with Article XIIID of the California Constitution; and WHEREAS, the City Council has duly considered said reports and each and every part thereof; and finds that each and every part of said reports is sufficient, and that no part of said reports requires modification in any respect;
NOW, THEREFORE, be it resolved by the City Council of the City of Redlands as follows:

Section 1. That the Engineer's estimate of the itemized costs and expenses of said work and of the incidental expenses in connection therewith, contained in said reports be, and each of them are hereby, preliminarily approved and confirmed.

Section 2. That the diagram showing the Street Lighting District No. 1 and Landscape Maintenance District No. 1 referred to and described in said reports, and the boundaries of the lots and parcels of land within such assessment district as the same existed at the time of passage of this resolution, are hereby preliminarily approved and confirmed.

Redlands Regular Meeting 06-07-2022 1476 of 1593
Section 3. That the proposed assessment upon the properties in Street Lighting District No. 1 and Landscape Maintenance District No. 1, in proportion to the estimated benefit to be received by such properties, respectively, from said work and of the incidental expenses thereof, as contained in said report is hereby preliminarily approved and confirmed.

Section 4. That said reports shall stand as the Engineer's Report for the purposes of all subsequent proceedings for Street Lighting District No. 1 and Landscape Maintenance District No.

1. APPROVED AND ADOPTED this 7th day of June, 2022.
________________________
Paul T. Barich, Mayor
ATTEST:
__________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1477 of 1593
I, Jeanne Donaldson, City Clerk of the City of Redlands hereby certify that the foregoing resolution was duly adopted by the City Council at a regular meeting thereof held on the 7th day of June, 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAINED:
_______________________________

Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1478 of 1593
This page intentionally left blank.

Redlands Regular Meeting 06-07-2022 1479 of 1593
RESOLUTION NO. 8296

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS

DECLARING ITS INTENTION TO LEVY AND COLLECT ASSESSMENTS WITHIN REDLANDS’ STREET LIGHTING ASSESSMENT DISTRICT NO. 1 AND LANDSCAPE ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2021-2022 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, AND ESTABLISHING A TIME AND PLACE FOR PUBLIC HEARINGS

FOR THE TWO DISTRICTS TO CONSIDER PROTESTS

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:

Section 1. The City Council of the City of Redlands hereby (1) finds that the public interest and convenience requires, and (2) declares its intention to levy and collect, assessments against the lots and parcels of property within an existing assessment districts designated “Redlands’ Street Lighting Assessment District No. 1 and Landscape Assessment District No. 1” (the “Districts”) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code (commencing with Section 22500) (the “Act”) for fiscal year 2022- 2023, commencing July 1, 2022, and ending June 30, 2023, to pay for the costs and expenses of the improvements described in Section 3 hereof.

Section 2. Reference is hereby made to a map on file in the office of the City Clerk and open for public inspection for a description of the exterior boundaries of the Districts.

Section 3. The proposed improvements are briefly described as follows: The operation, maintenance and servicing of public within the District, including the operation, maintenance and servicing of public lighting facilities and landscaping, including safety lighting, traffic signals, trees, shrubs, grass and other ornamental vegetation, and appurtenant facilities, located along public roadways, streets and rights-of-way within the boundaries of the Districts. “Maintenance” means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of the public lighting and landscaping facilities, and appurtenant facilities, including repair, removal or replacement of all or part of any of the public lighting and landscaping facilities, or appurtenant facilities. “Servicing” means the maintenance of any of the public lighting and landscaping facilities or appurtenant facilities, including the furnishing of electric current, energy or gas for the operation of any of the lighting facilities and the furnishing of water for the irrigation of any of the landscaping facilities.

Section 4. The assessments to be levied and collected against the assessable lots and parcels of property within the Districts for fiscal year 2022-2023 are not proposed to increase from the assessments levied and collected for fiscal year 1997-1998.

Section 5. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the Districts shall not be subject to assessment to be made under these proceedings to cover any of the costs and expenses of the improvements.

Redlands Regular Meeting 06-07-2022 1480 of 1593
Section 6. All railroad, gas, water and electric utility rights-of-way are included within the Districts and shall be assessed in accordance with the benefits received from the improvements.

Section 7. Reference is hereby made to the Reports of the Engineer entitled “City of Redlands Street Lighting District No. 1 Engineer’s Report for Fiscal Year 2022-2023” and “City of Redlands Landscape Maintenance District No. 1 Engineer’s Report for Fiscal Year 2022-2023” on file in the office of the City Clerk for a full and detailed description of the improvements, the boundaries of the District and any zones therein and the proposed assessments upon assessable lots and parcels of land within the District.

Section 8. NOTICE IS HEREBY GIVEN THAT THE CITY COUNCIL APPOINTS TUESDAY, THE 21ST DAY OF JUNE, 2022, AT THE HOUR OF 6:00 P.M., OR AS SOON

THEREAFTER AS THE MATTER MAY BE HEARD, IN THE COUNCIL CHAMBERS AT CITY HALL, CITY OF REDLANDS, 35 CAJON STREET, SUITE 2, REDLANDS, CALIFORNIA 92373, AS THE TIME AND PLACE FOR TWO PUBLIC HEARINGS TO

CONSIDER PROTESTS OR OBJECTIONS TO THE LEVY OF THE PROPOSED ASSESSMENTS IN CONNECTION WITH THE DISTRICTS. All interested persons shall be afforded the opportunity to hear and be heard. Any interested person may file a written protest with the City Clerk prior to the conclusion of the hearing. A written protest shall state all grounds of objection. A protest by a property owner shall contain a description sufficient to identify the property owned by the signer thereof. The City Council shall consider all oral statements and all written protests made or filed by any interested person.

Section 9. The City Clerk is hereby authorized and directed to give notice of such hearing in accordance with law.

Section 10. The City Council hereby determines and declares that the proposed assessments constitute a continuation of assessments existing on the effective date of Article XIIID, that the assessments are imposed exclusively to finance the maintenance and operation expenses for streets and that the assessments are exempt from the requirements of Article XIIID, Section 4 of the California Constitution.

Section 11. The City Council hereby designates Goutam Dobey, Engineering Manager, telephone number (909) 798-7584 x2, to answer inquiries regarding the hearing, protest proceedings and procedural or technical matters.

ADOPTED, SIGNED AND APPROVED this 7th day of June, 2022.

Redlands Regular Meeting 06-07-2022 1481 of 1593
______________________________
Paul T. Barich, Mayor
ATTEST:
__________________________
Jeanne Donaldson, City Clerk
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was duly adopted by the City Council, at a regular meeting thereof, held on the 7th day of June, 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAINED:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1482 of 1593
This page intentionally left blank.

Redlands Regular Meeting 06-07-2022 1483 of 1593
RESOLUTION NO. 8277

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS CONFIRMING A DIAGRAM AND ASSESSMENT FOR THE 2022-2023

FISCAL YEAR IN CONNECTION WITH LANDSCAPE MAINTENANCE
DISTRICT NO. 1 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, PART 2 OF DIVISION 15 OF THE CALIFORNIA STREETS AND

HIGHWAYS CODE

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:

Section 1. Pursuant to its adoption of a prior resolution, the City Council of the City of Redlands initiated proceedings and declared its intention to levy an assessment against the assessable lots and parcels of property within an existing assessment district designated “Landscape Maintenance District No 1” (the District) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (commencing with Section 22500) (the “Act”) for the fiscal year commencing July 1, 2022, and ending June 30, 2023, and ordered the Engineering Manager, Goutam Dobey, to prepare and file a written report in accordance with Article 4 of Chapter 1 of the Act. The City Council, by prior resolution, approved such Engineer’s Report.

Section 2. Following notice duly given in accordance with law, this City Council has held a full and fair public hearing regarding the Engineer’s Report and the levy and collection of the proposed assessment within the District for fiscal year 2022-2023 to pay for the costs and expenses of the improvements described in the Engineer’s Report pursuant to the terms and provisions of the Act. All interested persons were afforded the opportunity to hear, and be heard regarding, protests and objections to the levy and collection of the proposed assessment against lots or parcels of property within the District. The City Council considered all oral and written statements, protests and communications made or filed by interested persons.

Section 3. Based upon its review of the Engineer’s Report and other reports and information, this City Council hereby finds and determines that (i) the land within the District will be benefited by the improvements described in the Engineer’s Report (ii) the District includes all of the lands so benefited, and (iii) the net amount to be assessed upon the lands with the District for the 2022-2023 fiscal year in accordance with the Engineer’s Report is apportioned by a formula and method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements. Any and all oral and written protests and objections are hereby overruled by the City Council.

Section 4. The City Council declares that the diagram and assessment in the Engineer’s Report are hereby confirmed as filed.

Section 5. The City Council hereby orders the improvements described in the Engineer’s Report to be made.

Redlands Regular Meeting 06-07-2022 1484 of 1593
Section 6. The assessment is in compliance with the provisions of the Act and the City Council has complied with all law pertaining to the levy of an annual assessment pursuant to the Act.

Section 7. The assessments to be levied and collected against the assessable lots and parcels of property within the District for fiscal year 2022-2023 are not proposed to increase from the assessment levied and collected for fiscal year 1997-1998.

Section 8. The assessment is levied without regard to property valuation.

Section 9. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the District shall not be subject to assessment to be made under these proceedings to pay for any of the costs and expenses of the improvements.

Section 10. The assessment is levied for the purpose of paying the costs and expenses of the improvements described in the Engineer’s Report for fiscal year 2022-2023.

Section 11. The improvements described in the Engineer’s Report shall be performed pursuant to law.

Section 12. The County Auditor of San Bernardino County shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes collected. After collection by the County, the net amount of the assessments shall be paid to the City Treasurer.

Section 13. The City Treasurer shall deposit all moneys representing assessments collected by the County to the credit of a special fund for Landscape Maintenance District No. 1.

Section 14. The adoption of this Resolution constitutes the levy of an assessment against the lots and parcels of land in the District for the fiscal year commencing July 1, 2022, and ending June 30, 2023.

Section 15. The City Clerk is hereby authorized and directed to file the diagram and assessment, or a certified copy of the diagram and assessment, with the County Auditor, together with a certified copy of this Resolution upon its adoption.

Section 16. A certified copy of the assessment and diagram shall be filed in the City’s Municipal Utilities and Engineering Department, with a duplicate copy on file in the office of the City Clerk and open for public inspection.

Redlands Regular Meeting 06-07-2022 1485 of 1593
ADOPTED, SIGNED AND APPROVED this 21st day of June 2022.

________________________________
Paul T. Barich, Mayor
ATTEST:
_______________________________
Jeanne Donaldson, City Clerk
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was adopted by the City Council, at a regular meeting thereof, held on the 21st day of June, 2022 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
________________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1486 of 1593
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023

APPENDIX D

ASSESSMENT ROLL
Redlands Regular Meeting 06-07-2022 1487 of 1593
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-07-2022 1488 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
0167-081-13-0000 Annexation S10-E Zone 1 & 3 $13.76
0167-081-14-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-15-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-16-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-17-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-18-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-19-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-20-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-21-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-22-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-23-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-24-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-25-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-26-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-27-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-28-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-29-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-30-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-31-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-32-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-33-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-34-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-35-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-36-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-37-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-38-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-39-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-40-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-41-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-42-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-43-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-44-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-45-0000 Annexation S10-E Zone 1 & 3 13.76
0167-101-13-0000 Annexation S7-E Zone 1 & 3 198.10
0167-231-19-0000 Annexation S1-D Zone 3 20.05
0167-231-20-0000 Annexation S1-D Zone 3 20.05
0167-231-21-0000 Annexation S1-D Zone 3 20.05
0167-271-61-0000 Annexation S3-D Zone 3 100.25
0167-851-39-0000 Annexation S5-B Zone 1 14.05
0167-851-40-0000 Annexation S5-B Zone 1 14.05
0167-851-41-0000 Annexation S5-B Zone 1 14.05
0167-851-42-0000 Annexation S5-B Zone 1 14.05
0167-851-43-0000 Annexation S5-B Zone 1 14.05
0167-851-44-0000 Annexation S5-B Zone 1 14.05
0167-851-45-0000 Annexation S5-B Zone 1 14.05
0167-851-46-0000 Annexation S5-B Zone 1 14.05
0167-851-47-0000 Annexation S5-B Zone 1 14.05
0167-851-48-0000 Annexation S5-B Zone 1 14.05
0167-851-49-0000 Annexation S5-B Zone 1 14.05
0167-851-50-0000 Annexation S5-B Zone 1 14.05
0167-851-51-0000 Annexation S5-B Zone 1 14.05
0167-851-52-0000 Annexation S5-B Zone 1 14.05
0167-851-53-0000 Annexation S5-B Zone 1 14.05
0167-851-54-0000 Annexation S5-B Zone 1 14.05
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
Redlands Regular Meeting 06-07-2022 1489 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0167-851-55-0000 Annexation S5-B Zone 1 14.05
0167-851-56-0000 Annexation S5-B Zone 1 14.05
0167-861-37-0000 Annexation S5-B Zone 1 14.05
0167-861-38-0000 Annexation S5-B Zone 1 14.05
0167-861-39-0000 Annexation S5-B Zone 1 14.05
0167-861-40-0000 Annexation S5-B Zone 1 14.05
0167-861-41-0000 Annexation S5-B Zone 1 14.05
0167-861-42-0000 Annexation S5-B Zone 1 14.05
0167-861-43-0000 Annexation S5-B Zone 1 14.05
0167-861-44-0000 Annexation S5-B Zone 1 14.05
0167-861-45-0000 Annexation S5-B Zone 1 14.05
0167-861-46-0000 Annexation S5-B Zone 1 14.05
0167-861-47-0000 Annexation S5-B Zone 1 14.05
0167-861-48-0000 Annexation S5-B Zone 1 14.05
0167-861-49-0000 Annexation S5-B Zone 1 14.05
0167-861-50-0000 Annexation S5-B Zone 1 14.05
0167-861-51-0000 Annexation S5-B Zone 1 14.05
0167-861-52-0000 Annexation S5-B Zone 1 14.05
0167-861-53-0000 Annexation S5-B Zone 1 14.05
0167-861-54-0000 Annexation S5-B Zone 1 14.05
0168-271-13-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-14-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-15-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-16-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-17-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-18-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-19-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-20-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-21-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-22-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-23-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-24-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-25-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-26-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-27-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-28-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-29-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-30-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-31-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-32-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-33-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-34-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-35-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-36-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-37-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-38-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-39-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-40-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-41-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-42-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-43-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-44-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-45-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-46-0000 Annexation S10-U Zone 1, 3 & 4 14.32
Redlands Regular Meeting 06-07-2022 1490 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-271-47-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-48-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-731-01-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-02-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-03-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-04-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-05-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-06-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-07-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-08-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-09-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-10-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-11-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-12-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-13-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-14-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-15-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-16-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-17-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-18-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-19-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-20-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-21-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-22-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-23-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-24-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-25-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-01-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-02-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-03-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-04-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-05-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-06-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-07-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-08-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-09-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-10-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-11-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-12-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-13-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-14-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-15-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-16-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-17-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-18-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-19-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-20-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-21-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-22-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-23-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-24-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-25-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-26-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-27-0000 Annexation S10-C Zone 1, 3 & 4 17.12
Redlands Regular Meeting 06-07-2022 1491 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-741-28-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-29-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-30-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-31-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-32-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-33-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-34-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-35-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-36-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-37-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-38-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-39-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-40-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-41-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-42-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-43-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-44-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-45-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-46-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-47-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-48-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-49-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-50-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-51-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-52-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-53-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-54-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-55-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-56-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-57-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-58-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-59-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-60-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-61-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-62-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-63-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-64-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-65-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-66-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-67-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-68-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-69-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-70-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-71-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-72-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-73-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-74-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-75-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-76-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-77-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-78-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-01-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-02-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-03-0000 Annexation S10-C Zone 1, 3 & 4 17.12
Redlands Regular Meeting 06-07-2022 1492 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-751-04-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-05-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-06-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-07-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-08-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-09-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-10-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-11-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-12-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-13-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-14-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-15-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-16-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-17-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-18-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-19-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-20-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-21-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-22-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-23-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-24-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-25-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-26-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-27-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-28-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-29-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-30-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-31-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-32-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-33-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-34-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-35-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-36-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-37-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-38-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-39-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-40-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-41-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-42-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-43-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-44-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-45-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-46-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-47-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-48-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-49-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-50-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-51-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-52-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-53-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-54-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-55-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-56-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-771-01-0000 Annexation S10-H Zone 1 & 4 15.27
Redlands Regular Meeting 06-07-2022 1493 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-771-02-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-03-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-04-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-05-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-06-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-07-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-08-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-09-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-10-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-11-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-12-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-13-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-14-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-15-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-16-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-17-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-18-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-19-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-20-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-21-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-22-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-23-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-24-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-25-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-26-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-27-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-28-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-29-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-30-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-31-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-32-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-33-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-34-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-35-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-36-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-37-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-38-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-39-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-40-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-41-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-42-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-43-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-44-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-45-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-46-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-47-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-48-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-49-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-50-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-01-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-02-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-03-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-04-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-05-0000 Annexation S10-H Zone 1 & 4 15.27
Redlands Regular Meeting 06-07-2022 1494 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-781-06-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-07-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-08-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-09-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-10-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-11-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-12-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-13-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-14-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-15-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-16-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-17-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-18-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-19-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-20-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-21-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-22-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-23-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-24-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-25-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-26-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-27-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-28-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-29-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-30-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-31-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-32-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-33-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-34-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-01-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-02-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-03-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-04-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-05-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-06-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-07-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-08-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-09-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-10-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-11-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-12-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-13-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-14-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-15-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-16-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-17-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-18-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-19-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-20-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-21-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-22-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-23-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-24-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-25-0000 Annexation S10-H Zone 1 & 4 15.27
Redlands Regular Meeting 06-07-2022 1495 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-791-26-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-27-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-28-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-01-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-02-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-03-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-04-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-05-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-06-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-07-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-08-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-09-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-10-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-11-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-12-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-13-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-14-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-15-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-16-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-17-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-18-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-19-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-20-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-21-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-22-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-23-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-24-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-25-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-26-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-27-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-28-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-29-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-30-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-31-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-32-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-33-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-34-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-35-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-36-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-37-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-38-0000 Annexation S10-H Zone 1 & 4 15.27
0169-011-32-0000 Annexation S10-J Zone 4 29.44
0169-011-33-0000 Annexation S10-J Zone 4 29.44
0169-011-34-0000 Annexation S10-J Zone 4 29.44
0169-011-35-0000 Annexation S10-J Zone 4 29.44
0169-011-38-0000 Annexation S10-J Zone 4 14.72
0169-011-39-0000 Annexation S10-J Zone 4 14.72
0169-043-14-0000 Annexation S4-D Zone 1 58.35
0169-053-12-0000 Annexation S1-L Zone 3 20.05
0169-131-33-0000 Annexation S1-F Zone 1 19.45
0169-142-11-0000 Annexation S1-I Zone 3 20.05
0169-182-02-0000 Annexation S1-P Zone 1 12.97
0169-182-03-0000 Annexation S1-P Zone 1 12.97
0169-182-04-0000 Annexation S1-P Zone 1 12.97
Redlands Regular Meeting 06-07-2022 1496 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0169-212-17-0000 Annexation S1-Y Zone 3 60.15
0169-212-18-0000 Annexation S1-Y Zone 3 20.05
0169-212-19-0000 Annexation S1-Y Zone 3 20.05
0169-212-20-0000 Annexation S1-Y Zone 3 40.10
0169-212-21-0000 Annexation S1-Y Zone 3 80.20
0169-212-22-0000 Annexation S1-Y Zone 3 60.15
0169-212-23-0000 Annexation S1-Y Zone 3 20.05
0169-212-24-0000 Annexation S1-Y Zone 3 20.05
0169-212-25-0000 Annexation S1-Y Zone 3 20.05
0169-212-26-0000 Annexation S1-Y Zone 3 20.05
0169-212-27-0000 Annexation S1-Y Zone 3 20.05
0169-272-29-0000 Annexation S10-Q Zone 1 65.48
0169-281-39-0000 Annexation S3-C Zone 3 20.05
0169-281-45-0000 Annexation S10-Q Zone 2 98.22
0169-281-46-0000 Annexation S10-Q Zone 1 32.74
0169-301-08-0000 Annexation S4-G Zone 4 7.01
0169-301-10-0000 Annexation S4-G Zone 4 7.01
0169-301-11-0000 Annexation S4-G Zone 4 7.01
0169-313-16-0000 Annexation S4-I Zone 1 77.80
0169-321-01-0000 Annexation S3-A Zone 3 40.10
0169-321-02-0000 Annexation S3-A Zone 3 40.10
0169-343-07-0000 Annexation S1-T Zone 3 20.05
0169-411-07-0000 Annexation S1-H Zone 4 105.15
0170-481-20-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-21-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-22-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-23-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-24-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-25-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-26-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-27-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-28-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-29-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-30-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-31-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-32-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-33-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-34-0000 Annexation S10-F Zone 1 & 4 17.28
0171-011-67-0000 Annexation S10-V Zone 1 19.45
0171-161-17-0000 Annexation S7-A Zone 3 181.54
0171-171-34-0000 Annexation S1-S Zone 3 99.15
0171-202-30-0000 Annexation S4-C Zone 3 40.10
0171-202-33-0000 Annexation S5-C Zone 1 19.45
0171-203-13-0000 Annexation S6-B Zone 1 38.90
0171-331-04-0000 Annexation S1-J Zone 3 20.05
0171-332-30-0000 Annexation S7-D Zone 1 38.90
0171-341-33-0000 Annexation S3-J Zone 3 80.20
0171-383-19-0000 Annexation S1-E Zone 3 20.05
0171-383-20-0000 Annexation S1-E Zone 3 20.05
0171-431-05-0000 Annexation S10-P Zone 3 120.30
0172-031-49-0000 Annexation S1-M Zone 3 20.05
0172-091-24-0000 Annexation S10-G Zone 1 26.93
0172-091-25-0000 Annexation S10-G Zone 1 26.93
0172-091-26-0000 Annexation S10-G Zone 1 26.93
Redlands Regular Meeting 06-07-2022 1497 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0172-091-27-0000 Annexation S10-G Zone 1 26.93
0172-091-28-0000 Annexation S10-G Zone 1 26.93
0172-091-29-0000 Annexation S10-G Zone 1 26.93
0172-091-30-0000 Annexation S10-G Zone 1 26.93
0172-091-31-0000 Annexation S10-G Zone 1 26.93
0172-091-32-0000 Annexation S10-G Zone 1 26.93
0172-091-33-0000 Annexation S10-G Zone 1 26.93
0172-091-34-0000 Annexation S10-G Zone 1 26.93
0172-091-35-0000 Annexation S10-G Zone 1 26.93
0172-091-36-0000 Annexation S10-G Zone 1 26.93
0172-121-03-0000 Annexation S8-A Zone 3 20.05
0172-121-10-0000 Annexation S10-O Zone 3 26.73
0172-121-11-0000 Annexation S10-O Zone 3 26.73
0172-121-14-0000 Annexation S10-O Zone 3 26.73
0172-301-14-0000 Annexation S4-A Zone 4 25.24
0172-301-15-0000 Annexation S4-A Zone 4 12.62
0172-301-16-0000 Annexation S4-A Zone 4 12.62
0172-301-17-0000 Annexation S4-A Zone 4 12.62
0172-301-18-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-19-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-20-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-21-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-22-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-26-0000 Annexation S10-B Zone 1 & 4 23.48
0173-251-21-0000 Annexation S10-N Zone 3 60.15
0174-021-41-0000 Annexation S5-E Zone 1 19.45
0174-021-42-0000 Annexation S5-E Zone 1 19.45
0174-261-15-0000 Annexation S7-G Zone 1 155.60
0174-281-33-0000 Annexation S9-B Zone 1 14.59
0174-281-34-0000 Annexation S9-B Zone 1 14.59
0174-281-35-0000 Annexation S9-B Zone 1 14.59
0174-281-37-0000 Annexation S9-B Zone 1 14.59
0174-621-01-0000 Annexation S1-N Zone 1 19.45
0174-621-02-0000 Annexation S1-N Zone 1 19.45
0174-621-03-0000 Annexation S1-N Zone 1 19.45
0174-621-04-0000 Annexation S1-N Zone 1 19.45
0174-621-05-0000 Annexation S1-N Zone 1 19.45
0174-621-06-0000 Annexation S1-N Zone 1 19.45
0174-621-07-0000 Annexation S1-N Zone 1 19.45
0174-621-08-0000 Annexation S1-N Zone 1 19.45
0174-621-09-0000 Annexation S1-N Zone 1 19.45
0174-621-10-0000 Annexation S1-N Zone 1 19.45
0174-621-11-0000 Annexation S1-N Zone 1 19.45
0174-621-12-0000 Annexation S1-N Zone 1 19.45
0174-621-13-0000 Annexation S1-N Zone 1 19.45
0174-621-14-0000 Annexation S1-N Zone 1 19.45
0174-621-15-0000 Annexation S1-N Zone 1 19.45
0174-621-16-0000 Annexation S1-N Zone 1 19.45
0174-621-17-0000 Annexation S1-N Zone 1 19.45
0174-621-18-0000 Annexation S1-N Zone 1 19.45
0174-621-19-0000 Annexation S1-N Zone 1 19.45
0174-621-20-0000 Annexation S1-N Zone 1 19.45
0174-621-21-0000 Annexation S1-N Zone 1 19.45
0174-621-22-0000 Annexation S1-N Zone 1 19.45
Redlands Regular Meeting 06-07-2022 1498 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0174-621-23-0000 Annexation S1-N Zone 1 19.45
0174-621-24-0000 Annexation S1-N Zone 1 19.45
0174-621-25-0000 Annexation S1-N Zone 1 19.45
0174-621-26-0000 Annexation S1-N Zone 1 19.45
0174-621-27-0000 Annexation S1-N Zone 1 19.45
0174-621-28-0000 Annexation S1-N Zone 1 19.45
0174-621-29-0000 Annexation S1-N Zone 1 19.45
0174-621-30-0000 Annexation S1-N Zone 1 19.45
0174-621-31-0000 Annexation S1-N Zone 1 19.45
0174-621-32-0000 Annexation S1-N Zone 1 19.45
0174-621-33-0000 Annexation S1-N Zone 1 19.45
0174-621-34-0000 Annexation S1-N Zone 1 19.45
0174-621-35-0000 Annexation S1-N Zone 1 19.45
0174-631-01-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-02-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-03-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-04-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-05-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-06-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-07-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-08-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-09-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-11-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-12-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-13-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-14-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-15-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-16-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-17-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-18-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-19-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-20-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-21-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-22-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-23-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-24-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-25-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-26-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-27-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-28-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-29-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-30-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-31-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-32-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-33-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-34-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-35-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-37-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-38-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-39-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-40-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-41-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-42-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-43-0000 Annexation S10-A Zone 1 & 3 25.19
Redlands Regular Meeting 06-07-2022 1499 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0174-631-44-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-45-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-46-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-47-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-48-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-49-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-50-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-51-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-52-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-53-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-54-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-55-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-56-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-57-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-58-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-63-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-64-0000 Annexation S10-A Zone 1 & 3 25.19
0176-014-16-0000 Annexation S10-R Zone 3 30.08
0176-014-17-0000 Annexation S10-R Zone 3 30.08
0176-441-18-0000 Annexation S2-D Zone 1 33.07
0176-441-19-0000 Annexation S2-D Zone 1 33.07
0176-441-20-0000 Annexation S2-D Zone 1 33.07
0176-441-21-0000 Annexation S2-D Zone 1 33.07
0176-441-22-0000 Annexation S2-D Zone 1 33.07
0176-441-23-0000 Annexation S2-D Zone 1 33.07
0176-441-24-0000 Annexation S2-D Zone 1 33.07
0176-441-25-0000 Annexation S2-D Zone 1 33.07
0176-441-26-0000 Annexation S2-D Zone 1 33.07
0176-441-27-0000 Annexation S2-D Zone 1 33.07
0176-521-01-0000 Annexation S7-H Zone 2 41.50
0176-521-02-0000 Annexation S7-H Zone 2 41.50
0176-521-03-0000 Annexation S7-H Zone 2 41.50
0176-521-04-0000 Annexation S7-H Zone 2 41.50
0176-521-05-0000 Annexation S7-H Zone 2 41.50
0176-521-06-0000 Annexation S7-H Zone 2 41.50
0176-521-07-0000 Annexation S7-H Zone 2 41.50
0176-521-08-0000 Annexation S7-H Zone 2 41.50
0176-521-09-0000 Annexation S7-H Zone 2 41.50
0176-521-10-0000 Annexation S7-H Zone 2 41.50
0176-521-11-0000 Annexation S7-H Zone 2 41.50
0176-521-12-0000 Annexation S7-H Zone 2 41.50
0176-521-13-0000 Annexation S7-H Zone 2 41.50
0176-521-18-0000 Annexation S7-H Zone 2 41.50
0176-521-19-0000 Annexation S7-H Zone 2 41.50
0176-521-20-0000 Annexation S7-H Zone 2 41.50
0176-521-21-0000 Annexation S7-H Zone 2 41.50
0176-521-22-0000 Annexation S7-H Zone 2 41.50
0176-521-23-0000 Annexation S7-H Zone 2 41.50
0176-521-27-0000 Annexation S7-H Zone 2 41.50
0176-521-28-0000 Annexation S7-H Zone 2 41.50
0176-521-29-0000 Annexation S7-H Zone 2 41.50
0176-521-30-0000 Annexation S7-H Zone 2 41.50
0176-521-31-0000 Annexation S7-H Zone 2 41.50
0176-521-32-0000 Annexation S7-H Zone 2 41.50
Redlands Regular Meeting 06-07-2022 1500 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0176-531-01-0000 Annexation S7-H Zone 2 41.50
0176-531-02-0000 Annexation S7-H Zone 2 41.50
0176-531-03-0000 Annexation S7-H Zone 2 41.50
0176-531-07-0000 Annexation S7-H Zone 2 41.50
0176-531-08-0000 Annexation S7-H Zone 2 41.50
0176-531-09-0000 Annexation S7-H Zone 2 41.50
0176-531-12-0000 Annexation S7-H Zone 2 41.50
0176-531-13-0000 Annexation S7-H Zone 2 41.50
0176-531-26-0000 Annexation S7-H Zone 2 41.50
0176-531-18-0000 Annexation S7-H Zone 2 41.50
0176-531-20-0000 Annexation S7-H Zone 2 41.50
0176-531-21-0000 Annexation S7-H Zone 2 41.50
0176-531-22-0000 Annexation S7-H Zone 2 41.50
0176-531-24-0000 Annexation S7-H Zone 2 41.50
0176-531-25-0000 Annexation S7-H Zone 2 41.50
0292-032-39-0000 Original District Zone 3 200.50
0292-032-40-0000 Original District Zone 3 40.10
0292-032-41-0000 Original District Zone 3 60.15
0292-032-42-0000 Original District Zone 3 320.80
0292-033-11-0000 Annexation S1-C Zone 4 231.33
0292-033-13-0000 Annexation S9-D Zone 3 80.20
0292-034-16-0000 Annexation S1-O Zone 3 20.05
0292-063-45-0000 Annexation S7-C Zone 4 42.06
0292-064-13-0000 Annexation S3-H Zone 4 84.12
0292-064-17-0000 Annexation S3-H Zone 4 84.12
0292-064-21-0000 Annexation S3-H Zone 4 84.12
0292-064-22-0000 Annexation S3-H Zone 4 42.06
0292-064-23-0000 Annexation S3-H Zone 4 42.06
0292-064-24-0000 Annexation S3-H Zone 4 147.21
0292-064-25-0000 Annexation S3-H Zone 4 42.06
0292-064-26-0000 Annexation S3-H Zone 4 21.03
0292-064-27-0000 Annexation S3-H Zone 4 21.03
0292-152-39-0000 Annexation S7-B Zone 3 100.25
0292-153-24-0000 Annexation S2-A Zone 3 80.20
0292-153-25-0000 Annexation S2-A Zone 3 80.20
0292-153-26-0000 Annexation S2-A Zone 3 40.10
0292-153-27-0000 Annexation S2-A Zone 3 40.10
0292-153-28-0000 Annexation S10-I Zone 1 & 4 59.43
0292-153-30-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-31-0000 Annexation S10-I Zone 1 & 4 59.43
0292-153-32-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-33-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-34-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-35-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-36-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-37-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-38-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-39-0000 Annexation S10-I Zone 1 & 4 79.24
0292-153-40-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-41-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-42-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-43-0000 Annexation S10-I Zone 1 & 4 19.81
0292-154-12-0000 Annexation S5-D Zone 3 100.25
0292-154-22-0000 Annexation S10-K Zone 1 & 4 80.96
Redlands Regular Meeting 06-07-2022 1501 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0292-154-23-0000 Annexation S10-K Zone 1 & 4 19.45
0292-154-24-0000 Annexation S10-K Zone 1 & 4 19.45
0292-154-25-0000 Annexation S10-K Zone 1 & 4 19.45
0292-156-21-0000 Annexation S1-W Zone 3 120.30
0292-157-16-0000 Annexation S6-A Zone 4 189.27
0292-157-20-0000 Annexation S9-E Zone 1 19.45
0292-157-31-0000 Annexation S2-H Zone 4 21.03
0292-158-17-0000 Annexation S8-B Zone 3 40.10
0292-165-15-0000 Annexation S3-F Zone 3 & 4 222.51
0292-166-11-0000 Annexation S1-K Zone 4 273.39
0292-182-30-0000 Annexation S1-U Zone 4 21.03
0292-182-31-0000 Annexation S1-U Zone 4 21.03
0292-192-11-0000 Annexation S4-E Zone 4 231.33
0292-201-37-0000 Annexation S4-B Zone 3 40.10
0292-201-39-0000 Annexation S4-B Zone 3 47.57
0292-310-07-0000 Annexation S3-B Zone 1 19.45
0292-310-36-0000 Annexation S4-F Zone 1 38.90
0292-310-42-0000 Annexation S10-M Zone 1 19.45
0292-321-10-0000 Annexation S1-G Zone 4 105.15
0292-331-15-0000 Annexation S2-F Zone 3 80.20
0292-331-16-0000 Annexation S2-F Zone 3 80.20
0292-381-08-0000 Annexation S3-G Zone 1 19.45
0292-441-11-0000 Annexation S2-B Zone 3 12.03
0292-441-12-0000 Annexation S2-B Zone 3 12.03
0292-441-13-0000 Annexation S2-B Zone 3 12.03
0292-441-14-0000 Annexation S2-B Zone 3 12.03
0292-441-15-0000 Annexation S2-B Zone 3 12.03
0293-172-16-0000 Annexation S1-B Zone 4 126.18
0293-172-17-0000 Annexation S1-B Zone 4 126.18
0293-172-18-0000 Annexation S1-B Zone 4 21.03
0293-421-01-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-02-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-03-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-04-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-05-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-06-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-07-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-08-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-09-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-10-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-11-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-12-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-13-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-14-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-15-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-16-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-17-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-18-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-19-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-20-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-21-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-22-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-23-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-24-0000 Annexation S9-A Zone 1 & 4 4.50
Redlands Regular Meeting 06-07-2022 1502 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0293-421-25-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-26-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-27-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-28-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-29-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-30-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-31-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-32-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-33-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-34-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-35-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-36-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-37-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-38-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-39-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-40-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-41-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-42-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-43-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-44-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-45-0000 Annexation S9-A Zone 1 & 4 4.50
0294-181-02-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-03-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-04-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-05-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-06-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-07-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-08-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-09-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-10-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-11-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-12-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-13-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-14-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-15-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-01-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-02-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-03-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-04-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-06-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-07-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-08-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-09-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-10-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-11-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-12-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-16-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-17-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-18-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-19-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-20-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-09-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-11-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-13-0000 Annexation S10-S Zone 1 & 3 49.54
Redlands Regular Meeting 06-07-2022 1503 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0294-201-15-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-19-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-21-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-27-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-28-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-02-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-03-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-04-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-06-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-07-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-08-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-09-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-10-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-12-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-13-0000 Annexation S10-S Zone 1 & 3 49.54
0294-222-01-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-07-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-08-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-09-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-10-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-11-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-12-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-01-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-07-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-01-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-01-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-07-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-08-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-09-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-10-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-11-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-12-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-13-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-01-0000 Annexation S10-T Zone 1 & 3 36.13
Redlands Regular Meeting 06-07-2022 1504 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0294-262-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-07-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-08-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-09-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-10-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-11-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-12-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-13-0000 Annexation S10-T Zone 1 & 3 36.13
1212-021-01-0000 Annexation S10-D Zone 1 16.94
1212-021-02-0000 Annexation S10-D Zone 1 16.94
1212-021-03-0000 Annexation S10-D Zone 1 16.94
1212-021-04-0000 Annexation S10-D Zone 1 16.94
1212-021-05-0000 Annexation S10-D Zone 1 16.94
1212-021-06-0000 Annexation S10-D Zone 1 16.94
1212-021-07-0000 Annexation S10-D Zone 1 16.94
1212-021-08-0000 Annexation S10-D Zone 1 16.94
1212-021-09-0000 Annexation S10-D Zone 1 16.94
1212-021-10-0000 Annexation S10-D Zone 1 16.94
1212-021-11-0000 Annexation S10-D Zone 1 16.94
1212-021-12-0000 Annexation S10-D Zone 1 16.94
1212-021-13-0000 Annexation S10-D Zone 1 16.94
1212-021-14-0000 Annexation S10-D Zone 1 16.94
1212-021-15-0000 Annexation S10-D Zone 1 16.94
1212-021-16-0000 Annexation S10-D Zone 1 16.94
1212-021-17-0000 Annexation S10-D Zone 1 16.94
1212-021-18-0000 Annexation S10-D Zone 1 16.94
1212-021-19-0000 Annexation S10-D Zone 1 16.94
1212-021-20-0000 Annexation S10-D Zone 1 16.94
1212-021-21-0000 Annexation S10-D Zone 1 16.94
1212-021-22-0000 Annexation S10-D Zone 1 16.94
1212-021-23-0000 Annexation S10-D Zone 1 16.94
1212-021-24-0000 Annexation S10-D Zone 1 16.94
1212-021-25-0000 Annexation S10-D Zone 1 16.94
1212-021-26-0000 Annexation S10-D Zone 1 16.94
1212-021-27-0000 Annexation S10-D Zone 1 16.94
1212-021-28-0000 Annexation S10-D Zone 1 16.94
1212-021-29-0000 Annexation S10-D Zone 1 16.94
1212-021-30-0000 Annexation S10-D Zone 1 16.94
1212-021-31-0000 Annexation S10-D Zone 1 16.94
1212-021-32-0000 Annexation S10-D Zone 1 16.94
1212-021-33-0000 Annexation S10-D Zone 1 16.94
1212-021-34-0000 Annexation S10-D Zone 1 16.94
1212-021-35-0000 Annexation S10-D Zone 1 16.94
1212-021-36-0000 Annexation S10-D Zone 1 16.94
1212-021-37-0000 Annexation S10-D Zone 1 16.94
1212-021-38-0000 Annexation S10-D Zone 1 16.94
1212-021-39-0000 Annexation S10-D Zone 1 16.94
1212-021-40-0000 Annexation S10-D Zone 1 16.94
1212-021-41-0000 Annexation S10-D Zone 1 16.94
1212-021-42-0000 Annexation S10-D Zone 1 16.94
Redlands Regular Meeting 06-07-2022 1505 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
1212-021-43-0000 Annexation S10-D Zone 1 16.94
1212-021-44-0000 Annexation S10-D Zone 1 16.94
1212-021-45-0000 Annexation S10-D Zone 1 16.94
1212-021-46-0000 Annexation S10-D Zone 1 16.94
1212-021-47-0000 Annexation S10-D Zone 1 16.94
1212-021-48-0000 Annexation S10-D Zone 1 16.94
1212-021-49-0000 Annexation S10-D Zone 1 16.94
1212-021-50-0000 Annexation S10-D Zone 1 16.94
1212-021-51-0000 Annexation S10-D Zone 1 16.94
1212-021-52-0000 Annexation S10-D Zone 1 16.94
1212-021-53-0000 Annexation S10-D Zone 1 16.94
1212-021-54-0000 Annexation S10-D Zone 1 16.94
1212-021-55-0000 Annexation S10-D Zone 1 16.94
1212-021-56-0000 Annexation S10-D Zone 1 16.94
1212-021-57-0000 Annexation S10-D Zone 1 16.94
1212-021-58-0000 Annexation S10-D Zone 1 16.94
1212-021-59-0000 Annexation S10-D Zone 1 16.94
1212-021-60-0000 Annexation S10-D Zone 1 16.94
1212-021-61-0000 Annexation S10-D Zone 1 16.94
1212-021-62-0000 Annexation S10-D Zone 1 16.94
1212-041-01-0000 Annexation S7-F Zone 1 77.80
1212-191-60-0000 Annexation S1-X Zone 1 19.45
1212-191-61-0000 Annexation S1-X Zone 1 19.45
1212-191-62-0000 Annexation S1-X Zone 1 19.45
1212-191-63-0000 Annexation S1-X Zone 1 19.45
1212-191-64-0000 Annexation S1-X Zone 1 19.45
1212-191-65-0000 Annexation S1-X Zone 1 19.45
1212-191-66-0000 Annexation S1-X Zone 1 19.45
1212-191-67-0000 Annexation S1-X Zone 1 19.45
1212-191-68-0000 Annexation S1-X Zone 1 19.45
1212-191-69-0000 Annexation S1-X Zone 1 19.45
1212-191-70-0000 Annexation S1-X Zone 1 19.45
1212-191-71-0000 Annexation S1-X Zone 1 19.45
1212-191-72-0000 Annexation S1-X Zone 1 19.45
1212-191-73-0000 Annexation S1-X Zone 1 19.45
1212-191-74-0000 Annexation S1-X Zone 1 19.45
1212-191-75-0000 Annexation S1-X Zone 1 19.45
1212-191-76-0000 Annexation S1-X Zone 1 19.45
1212-191-77-0000 Annexation S1-X Zone 1 19.45
1212-191-78-0000 Annexation S1-X Zone 1 19.45
1212-191-79-0000 Annexation S1-X Zone 1 19.45
1212-201-01-0000 Annexation S3-E Zone 1 25.93
1212-201-02-0000 Annexation S3-E Zone 1 25.93
1212-201-03-0000 Annexation S3-E Zone 1 25.93
1212-201-04-0000 Annexation S3-E Zone 1 25.93
1212-201-05-0000 Annexation S3-E Zone 1 25.93
1212-201-06-0000 Annexation S3-E Zone 1 25.93
1212-201-07-0000 Annexation S3-E Zone 1 25.93
1212-201-08-0000 Annexation S3-E Zone 1 25.93
1212-201-09-0000 Annexation S3-E Zone 1 25.93
1212-201-10-0000 Annexation S3-E Zone 1 25.93
1212-201-11-0000 Annexation S3-E Zone 1 25.93
1212-201-12-0000 Annexation S3-E Zone 1 25.93
1212-201-13-0000 Annexation S3-E Zone 1 25.93
Redlands Regular Meeting 06-07-2022 1506 of 1593

APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
1212-201-14-0000 Annexation S3-E Zone 1 25.93
1212-201-15-0000 Annexation S3-E Zone 1 25.93
1212-201-16-0000 Annexation S3-E Zone 1 25.93
1212-201-17-0000 Annexation S3-E Zone 1 25.93
1212-201-18-0000 Annexation S3-E Zone 1 25.93
1212-201-19-0000 Annexation S3-E Zone 1 25.93
1212-201-20-0000 Annexation S3-E Zone 1 25.93
1212-201-21-0000 Annexation S3-E Zone 1 25.93
1212-201-22-0000 Annexation S3-E Zone 1 25.93
1212-201-23-0000 Annexation S3-E Zone 1 25.93
1212-201-24-0000 Annexation S3-E Zone 1 25.93
1212-201-25-0000 Annexation S3-E Zone 1 25.93
1212-201-26-0000 Annexation S3-E Zone 1 25.93
1212-201-27-0000 Annexation S3-E Zone 1 25.93
1212-431-02-0000 Annexation S9-F Zone 3 100.25
Summary Fields Value
APN total count: 987
CHARGE total sum: $25,452.67
Redlands Regular Meeting 06-07-2022 1507 of 1593
City Council/Successor Agency Meeting K. 9.

DATE: 06/07/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of an Agreement with Houston & Harris PCS, Inc. in an amount not-to-exceed $900,000 for on-call sewer collection system maintenance, and determination that approval of the Agreement is exempt from environmental review pursuant to section 15301(b) of the State's Guidelines implementing the California Environmental Quality Act (Municipal Utilities and Engineering Director Harris)
MOTION(S):

If the City Council determines the staff recommendation is appropriate, the following motions are provided:

I move that the City Council determine approval of the Agreement with Houston & Harris PCS, Inc. is exempt from environmental review pursuant to section 15301(b) of the State's Guidelines implementing the California Environmental Quality Act; and

1. I move to approve the Agreement with Houston & Harris PCS, Inc. for on-call sewer collection system maintenance for an amount not-to-exceed $300,000 per year, for a one-year agreement with additional optional 2 one-year terms.

2. RECOMMENDATION:

Staff recommends that City Council determine approval of the Non-Professional Service Agreement with Houston & Harris PCS, Inc. for on-call sewer collection system maintenance is exempt from environmental review pursuant to section 15301(b) of the State's Guidelines implementing the California Environmental Quality Act, and approve the Agreement with Houston & Harris PCS, Inc. for an amount not-to-exceed $300,000 per year.

Redlands Regular Meeting 06-07-2022 1508 of 1593
DISCUSSION:

The Municipal Utilities and Engineering Department (MUED) operates and maintains a wastewater collection system that delivers raw sewage to the City’s Wastewater Treatment Plant (WWTP). The City is required to follow best management practices to properly maintain the wastewater collection system to prevent sanitary sewer overflows (SSOs) and other public health risks in accordance with the California State Water Resources Control Board Order No. 2006-0003 DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. This includes regular sewer collection pipeline cleaning and inspection activities to prevent SSOs, as well as appropriate SSO response, containment, and clean-up.

These types of activities are typically performed by the Wastewater Collection System Division, which is staffed with one supervisor, three line maintenance workers, and one maintenance worker. The division currently performs these maintenance and response activities utilizing a combination cleaning and inspection camera vehicle, an easement cleaner/trailer, and a service vehicle.

During emergencies, available staffing may be limited, and a need for on-call sewer collection system maintenance support is necessary.

On March 1, 2022, in accordance with Redlands Municipal Code 2.16.180, staff issued a Request For Bids (RFB) for on-call sewer collection system maintenance. On March 16, 2022, staff received one proposal from Houston & Harris PCS, Inc. for the amount of $391,209.60. An evaluation of the proposal found that it met all the requirements and demonstrated the firm’s ability to provide the scope of services specified in the RFB (attachment C). The RFB was released with estimated quantities for potential on-call services as actual quantities are not predictable and will only be used in the event that city resources are limited. Staff recommends City Council approval of a Non-Professional Service Agreement with Houston & Harris, Inc. for an amount not-to-exceed $300,000 per year.

Approval of the agreement with Houston & Harris PCS, Inc. is exempt from environmental review pursuant to Section 15301(b) of the State's guidelines implementing the California Environmental Quality Act (CEQA).

ALTERNATIVES:

City Council may deny the staff recommendation. This is not recommended, as it may result in delayed support services if a catastrophic infrastructure failure occurs, which could result in regulatory agency violations and fines due to non-compliance with California State Water Resources Control Board Order No. 2006-0003 DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.

Redlands Regular Meeting 06-07-2022 1509 of 1593
Sanitary Sewer Systems.

STRATEGIC PLAN:

N/A
SUBMITTED BY:

John R. Harris, Municipal Utilities and Engineering Director RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Goutam K. Dobey, Engineering Manager
Kevin O. Watson, Utilities Operations Manager
Dana Abramovitz-Daniel, Procurement Manager
PREPARED BY:

Ashley Rosario, Senior Administrative Assistant
Fiscal Impact
Fiscal Year: FY 21/22
Revenue Generating: N
Appropriation Required Y/N: N
Amount: $300,000
Budgeted Y/N: Y
Account No.: 521900-6710
Discussion:

There is no fiscal impact. This service is included in the FY21/22 MUED Budget, and the proposed FY 22/23 MUED Budget. Funding for services in future years will be included in annual MUED Budgets.

Attachments
A. Service Agreement
B. Bid Report
C. Bid Proposal
Redlands Regular Meeting 06-07-2022 1510 of 1593

AGREEMENT TO PERFORM NON-PROFESSIONAL SERVICES

FOR IMPROVEMENT TO PUBLIC BUILDINGS AND GROUNDS
This agreement for the provision of on-call sewer collection system maintenance support (“Agreement”) is made and entered in this 7th day of June, 2022 (“Effective Date”), by and between the City of Redlands, a municipal corporation (“City”) and Houston & Harris PCS, Inc. (“Contractor”). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.” In consideration of the mutual promises contained herein, City and Contractor agree as follows:

ARTICLE 1 – ENGAGEMENT OF CONTRACTOR

1.1 City hereby engages Contractor to perform on-call sewer collection system maintenance support services for City (the “Services”). The Services that Contractor shall perform are more particularly described in Exhibit “A,” titled “Scope of Services,” which is attached hereto and incorporated herein by this reference.

1.2 The Services shall be performed by Contractor in a professional manner, and Contractor represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional Contractors in the industry providing like and similar types of Services.

ARTICLE 2 – RESPONSIBILITIES OF CONTRACTOR

2.1 Contractor shall comply with all applicable federal, state and local laws and regulations in the performance of the Services including, but not limited, to all applicable Labor Code and prevailing wage laws and non-discrimination laws, including the Americans with Disabilities Act. Pursuant to Labor Code section 1773.2, copies of the prevailing rates of per diem wages as determined by the Director of the California Department of Industrial Relations for each craft, classification or type of worker needed to undertake the Services are on file at City’s Municipal Utilities and Engineering Department, located at the Civic Center, 35 Cajon Street, Suite 15A (Mailing: P.O. Box 3005), Redlands, California 92373.

2.2 Contractor acknowledges that if it violates the Labor Code provisions relating to prevailing wages that City may enforce such provisions by withholding payments to Contractor or its subcontractors pursuant to Labor Code section 1771.6.

2.3 If Contractor executes an agreement with a subcontractor to perform any portion of the Services, Contractor shall comply with Labor Code sections 1775 and 1777.7, and shall provide the subcontractor with copies of the provisions of Labor Code sections 1771, 1775, 1776, 1777.5, 1813 and 1815. Contractor acknowledges that the statutory provisions establishing penalties for failure to comply with state wage and hour laws and to pay prevailing wages may be enforced by City pursuant to Labor Code sections 1775 and 1813.

2.4 Contractor and its subcontractors shall comply with the provisions of Labor Code section 1776 regarding payroll records maintenance, certifications, retention and inspection.

Redlands Regular Meeting 06-07-2022 1511 of 1593

2.5 Contractor acknowledges that eight (8) hours constitutes a legal day’s work pursuant to Labor Code section 1810.

2.6 Contractor shall comply with the provisions of Labor Code section 1777.5 as to apprenticeships, and Labor Code sections 1771, 1775, 1776, 1777.5, 1813 and 1815.

2.7 Pursuant to Public Contract Code section 7103.5(b), Contractor offers and agrees to assign to City all rights, title and interest in and to all causes of action it may have under section 4 of the Clayton Act (15 U.S.C. section 15) or under the Cartwright Act (Chapter 2 (commencing with section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, goods or materials pursuant to this Agreement.

ARTICLE 3 – RESPONSIBILITIES OF CITY

3.1 City shall make available to Contractor information in its possession that may reasonably assist Contractor in performing the Services.

3.2 City designates John R. Harris, Municipal Utilities and Engineering Director, as City’s representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information, interpret and define City’s policies and decisions with respect to performance of the Services.

ARTICLE 4 – PERFORMANCE OF SERVICES

4.1 The Services shall commence as of the Effective Date of this Agreement. Contractor shall perform and complete the Services in a prompt and diligent manner in accordance with the schedule set forth in Exhibit “A,” which is attached hereto and incorporated herein by this reference.

4.2 The term of this Agreement shall be for a period of one (1) year from the Effective Date of this Agreement (the “Initial Term”). The City shall have the option to extend the Initial Term of this Agreement by two (2) additional one-year terms (each, an “Extended Term”), on the same terms and conditions, by providing written notice to Contractor at least thirty (30) days prior to the expiration of the Initial Term or any Extended Term.

The Initial Term and the Extended Terms are hereby collectively, referred to herein as the “Term” of this Agreement.

4.3 Contractor shall furnish a labor and material bond in the form attached hereto as Exhibit “B,” which is attached hereto and incorporated herein by this reference, in an amount equal to one hundred percent (100%) of the total compensation to be paid to Contractor pursuant to this Agreement.

ARTICLE 5 – PAYMENTS TO CONTRACTOR

5.1 The compensation for Contractor’s performance of the Services shall not exceed the amount of three hundred thousand dollars ($300,000) for the Services provided during Redlands Regular Meeting 06-07-2022 1512 of 1593
the Initial Term. Should this Agreement be renewed, the compensation for Contractor’s performance for the Services shall not exceed the amount of three hundred thousand dollars ($300,000) for the first Extended Term; and three hundred thousand dollars ($300,000) for the second Extended Term, bringing the total possible amount of compensation to a not-to-exceed amount of nine hundred thousand dollars ($900,000).

For the Initial Term and each Extended Term, City shall pay Contractor on a time and materials basis up to the not to not-to-exceed amount in accordance with the rates specified in Exhibit “C,” titled “Price and Fee Bid,” which is attached hereto and incorporated herein by reference.

5.2 Contractor shall submit monthly invoices to City describing the Services performed during the preceding month. Contractor’s invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom. City shall pay Contractor no later than thirty (30) days after receipt and approval by City of Contractor’s invoice.

5.3 Any notice or other communication required, or which may be given, pursuant to this Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date of delivery in person; (ii) five (5) days after deposit in first class registered mail, with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic mail transmission (including PDF), if confirmed with a copy sent contemporaneously by first class, certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a Party may provide notice in accordance with this section:

CITY CONTRACTOR
City Clerk Larry Houston, Vice President
City of Redlands Houston & Harris PCS, Inc.
35 Cajon Street 21831 Barton Rd.

P.O. Box 3005 (mailing) Grand Terrace, CA 92313
Redlands, CA 92373 lhouston@houston&harris.com
[email protected] 909-422-8990
(909) 798-7531 909-422-0841
ARTICLE 6 – INSURANCE AND INDEMNIFICATION

6.1 The following insurance coverage required by this Agreement shall be maintained by Contractor for the duration of its performance of the Services. Contractor shall not perform any Services unless and until the required insurance listed below is obtained by Contractor. Contractor shall provide City with certificates of insurance and endorsements evidencing such insurance prior to commencement of the Services. Insurance policies shall include a provision prohibiting cancellation or modification of the policy except upon thirty (30) days prior written notice to City.

A. Workers’ Compensation and Employer’s Liability insurance in the amount that meets statutory requirements with an insurance carrier acceptable to City, or certification to Redlands Regular Meeting 06-07-2022 1513 of 1593
City that Contractor is self-insured or exempt from the workers’ compensation laws of the State of California. Contractor shall execute and provide City with Exhibit “D,” titled “Workers’ Compensation Insurance Certification,” which is attached hereto and incorporated herein by this reference, prior to performance of the Services.

B. Comprehensive General Liability insurance with carriers acceptable to City in the minimum amount of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) aggregate, for public liability, property damage and personal injury is required. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City.

C. Business Auto Liability coverage, with minimum limits of One Million Dollars ($1,000,000) per occurrence, combined single limit bodily injury liability and property damage liability. This coverage shall include all Contractor owned vehicles used in connection with Contractor’s provision of the Services, hired and non-owned vehicles, and employee non-ownership vehicles. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City.

6.2 Contractor shall defend, indemnify, and hold harmless City and its elected and appointed officials, employees and agents from and against any and all claims, losses and liability, including attorneys’ fees, arising from injury or death to persons or damage to property occasioned by any negligent act or omission by, or the willful misconduct of, Contractor, or its officers, employees and agents in performing the Services.

ARTICLE 7 – CONFLICTS OF INTEREST

7.1 Contractor covenants and represents that it does not have any investment or interest in any real property that may be the subject of this Agreement or any other source of income, interest in real property or investment that would be affected in any manner or degree by the performance of Contractor’s Services. Contractor further covenants and represents that in the performance of its duties hereunder, no person having any such interest shall perform any Services under this Agreement.

7.2 Contractor agrees it is not a designated employee within the meaning of the Political Reform Act because Contractor:

A. Does not make a governmental decision whether to:
(i) approve a rate, rule or regulation, or adopt or enforce a City law; (ii) issue, deny, suspend or revoke any City permit, license, application, certification, approval, order or similar authorization or entitlement; (iii) authorize City to enter into, modify or renew a contract; (iv) grant City approval to a contract that requires City approval and to which City is a party, or to the specifications for such a contract; (v) grant City approval to a plan, design, report, study or similar item; Redlands Regular Meeting 06-07-2022 1514 of 1593
(vi) adopt, or grant City approval of, policies, standards or guidelines for City or for any subdivision thereof.

B. Does not serve in a staff capacity with City and in that capacity, participate in making a governmental decision or otherwise perform the same or substantially the same duties for City that would otherwise be performed by an individual holding a position specified in City’s Conflict of Interest Code under Government Code section 87302.

7.3 In the event City determines that Contractor must disclose its financial interests, Contractor shall complete and file a Fair Political Practices Commission Form 700, Statement of Economic Interests, with the City Clerk’s office pursuant to the written instructions provided by the City Clerk.

ARTICLE 8 – GENERAL CONSIDERATIONS

8.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys’ fees, including fees for the use of in-house counsel by a Party.

8.2 Contractor shall not assign any of the Services, except with the prior written approval of City and in strict compliance with the terms and conditions of this Agreement. Any assignment or attempted assignment without such prior written consent may, in the sole discretion of City, results in City’s immediate termination of this Agreement.

8.3 Contractor is for all purposes under this Agreement an independent contractor and shall perform the Services as an independent contractor. Neither City nor any of its agents shall have control over the conduct of Contractor or Contractor’s employees, except as herein set forth. Contractor shall supply all necessary tools and instrumentalities required to perform the Services. Assigned personnel employed by Contractor are for its account only, and in no event shall Contractor or personnel retained by it be deemed to have been employed by City or engaged by City for the account of, or on behalf of City. Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent, nor shall Contractor have any authority, express or implied, to bind City to any obligation.

8.4 This Agreement may be terminated by City, in its sole discretion, by providing not less than five (5) days prior written notice to Contractor of City’s intent to terminate. If this Agreement is terminated by City, an adjustment to Contractor’s compensation shall be made, but (i) no amount shall be allowed for anticipated profit or unperformed Services, and (ii) any payment due Contractor at the time of termination may be adjusted to the extent of any additional costs to City occasioned by any default by Contractor. Upon receipt of a termination notice, Contractor shall immediately discontinue its provision of the Services and, within five (5) days of the date of the termination notice, deliver or otherwise make available to City, copies (in both hard copy and electronic form, where applicable) of project related data, design calculations, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been Redlands Regular Meeting 06-07-2022 1515 of 1593
accumulated by Contractor in performing the Services. Contractor shall be compensated on a pro-rata basis for Services completed up to the date of termination.

8.5 Contractor shall maintain books, ledgers, invoices, accounts and other records and documents evidencing costs and expenses related to the Services for a period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor pursuant to this Agreement. Such books shall be available at reasonable times for examination by City at the office of Contractor.

8.6 This Agreement, including the Exhibits incorporated herein by reference, represents the entire agreement and understanding between the Parties as to the matters contained herein, and any prior negotiations, written proposals or verbal agreements relating to such matters are superseded by this Agreement. Except as otherwise provided for herein, any amendment to this Agreement shall be in writing, approved by City and signed by City and Contractor.

8.7 This Agreement shall be governed by and construed in accordance with the laws of the State of California, without regard to its conflicts of laws provisions. The Parties agree that all actions or proceedings arising in connection with this Agreement shall be tried and litigated only in the state courts located in San Bernardino County, California, and the federal courts located in Riverside County, California.

8.8 If one or more of the sentences, clauses, paragraphs or sections contained in this Agreement is declared invalid, void or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair or invalidate the remaining sentences, clauses, paragraphs or sections contained herein, unless to do so would deprive a Party of a material benefit of its bargain under this Agreement.

IN WITNESS WHEREOF, duly authorized representatives of City and Contractor have signed in confirmation of this Agreement.

CITY OF REDLANDS HOUSTON & HARRIS PCS, INC.

By: ___________________________ By: _________________________ Paul T. Barich, Mayor Larry Houston, Vice President
ATTEST:
___________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1516 of 1593
EXHIBIT "A"

SCOPE OF SERVICES
• Assistance with Sanitary Sewer Overflow (SSO’s) response in the event of failure beyond City’s response capability or other sewer related emergency throughout the City’s Sewer Collection System shown in Figure ES.1;
• Assistance with collection system main line bypass or other wastewater projects; • Assistance with sewer line maintenance cleaning and CCTV inspection activities due to resources constraints and/or projects; CCTV reports and documentation must be provided in GraniteNet Software
• Hour rate for equipment to include all costs associated with the equipment including fuel, mileage, related equipment, and supplies;
• Linear foot rate to include all costs associated with the service including staff, equipment, fuel, mileage, related equipment, and supplies; • Provide proper supervision and appropriate traffic control at the job site during all phases of work;
• All work to be performed in a safe manner, using the appropriate personal protective equipment and in accordance with the City’s safety practices, OSHA, and job specific contractor requirements;
• If required, prepare an Overflow Emergency Response Plan specific to the task and in accordance with the City’s Overflow Emergency Response Plan; and • Contractor must be within 30 miles from the City of Redlands Municipal Utilities & Engineering Department: 35 Cajon St. Suite 15A, Redlands CA 92373 • Contractor must respond to on-call sewer collection system maintenance support services within 1.5 hours or less
Redlands Regular Meeting 06-07-2022 1517 of 1593
EXHIBIT "B"

LABOR AND MATERIAL BOND
Whereas, the City of Redlands, State of California, and Houston & Harris PCS, Inc. (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to provide on-call sewer collection system maintenance support (the “Work”), which said agreement, dated June 7, 2022, and titled as “Agreement to Perform Non-Professional Services for Improvement to Public Builds and Grounds” is hereby referred to and made a part hereof; and Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of Three Hundred Thousand Dollars ($300,000) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on June 7, 2022.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:
_______________________________________
________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone( ) ___________________________
Redlands Regular Meeting 06-07-2022 1518 of 1593
EXHIBIT “C”

PRICE AND FEE BID
Item
No.

Description:

On-Call Sewer Collection
System Maintenance Support Unit
Cost per
Unit
(A)
Total
Quantity
(B)
Total Extended
Price
(A x B)
1 Combination Vehicle:

Mon-Fri 7:00 am - 5:00 pm per hour $484.84 80 $38,787.20 2 Combination Vehicle:

After Hours Mon-Fri
5:00 pm – 7:00 am and Weekends
per hour $597.59 80 $40,807.20
3 Combination Vehicle:

City Holidays per hour $597.59 80 $47,807.20
4 Staff (1):

Mon-Fri 7:00 am -5:00 pm per hour $100.00 160 $16,000.00 5 Staff (1):

Mon-Fri 5:00 pm-7:00 am
and Weekends
per hour $200.00 160 $32,000.00
6 Staff (1):

City Holidays
per hour $200.00160 $32,000.00
7 Sewer Main Line Cleaning:
(including all staff, equipment,
and other associated costs)
per linear foot $5.66 10600 $59,996.00
8 Sewer Main Line CCTV:

Inspection (including all staff
equipment and other associated
costs)
per linear foot $5.36 10600 $56,816.60
9 Line Jetting:
(including all staff equipment
and other associated
costs)
per linear foot $5.66 10600 $59,996.00
TOTAL SUM BID (Items 1 through 9) $391,209.60
Redlands Regular Meeting 06-07-2022 1519 of 1593
EXHIBIT “D”
WORKERS’ COMPENSATION INSURANCE CERTIFICATION
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
(a) By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations, a certificate of consent to self-insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

HOUSTON & HARRIS PCS, INC.

By: Date: _______ __________
Larry Houston, Vice President
Redlands Regular Meeting 06-07-2022 1520 of 1593
Redlands Regular Meeting 06-07-2022 1521 of 1593
Redlands Regular Meeting 06-07-2022 1522 of 1593
Redlands Regular Meeting 06-07-2022 1523 of 1593
Redlands Regular Meeting 06-07-2022 1524 of 1593
Redlands Regular Meeting 06-07-2022 1525 of 1593
Redlands Regular Meeting 06-07-2022 1526 of 1593
Redlands Regular Meeting 06-07-2022 1527 of 1593
Redlands Regular Meeting 06-07-2022 1528 of 1593
Redlands Regular Meeting 06-07-2022 1529 of 1593
City Council/Successor Agency Meeting K. 10.

DATE: 06/07/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of an agreement with Mariposa Landscapes, Inc., in the amount of $308,072.44 for Sports Field Maintenance; and determination that approval of the agreement is not subject to environmental review pursuant to Section 15301 of the State's guidelines implementing the California Environmental Quality Act (Assistant City Manager Boatman)
MOTION(S):

If the City Council determines that staff’s recommendation is appropriate, the following motions are provided:

I move that the City Council determine that approval of the agreement is categorically exempt from environmental review in accordance with Section 15301 of the State's guidelines implementing the California Environmental Quality Act; and

1. I move that the City Council award an agreement to Mariposa Landscapes, Inc., in the amount of $308,072.44 for Sports Field Maintenance.

2. RECOMMENDATION:

Staff recommends that City Council award the agreement to Mariposa Landscapes, Inc., in the amount of $308,072.44 for sports field maintenance services and determine that approval of the agreement is categorically exempt from environmental review in accordance with Section 15301 of the State's guidelines implementing the California Environmental Quality Act.

Redlands Regular Meeting 06-07-2022 1530 of 1593
DISCUSSION:

The Facilities and Community Services Department coordinates the use of City sports fields for various sports, recreational activities, and programs. The City has a total of 19 recreational sports fields located within 5 of the City’s parks.

These parks include Crafton Park, Redlands Sports Complex, Community Park, Brookside Park, and Texonia Park. On June 15, 2021, City Council adopted an Athletic Field Allocation Policy, pursuant to Resolution No 8210. The policy established a process for field space allocation based on priorities and objectives such as safe, quality fields for use by Redlands residents; maximize playtime through efficient rescheduling; turf recovery periods to maintain safe quality fields; fair and equitable distribution of available fields; transparency and consistency in scheduling; communicate expectations for field use; and adequately fund field maintenance and long-term capital needs.

Subsequently, after the adoption of the policy City Council adopted Resolution No. 8257 on November 2, 2021, for the establishment of field rental fees. The fees are intended to recover costs for field maintenance and further support city recreational programs. The fees adopted were based on existing agreements and the desire to maintain affordable options for residents. City staff performs the routine maintenance and oversight of these park areas; in addition to utilizing outside contractual services on an as-needed basis. These additional outside services help ensure consistent maintenance and also allow staff to focus on more specialized tasks within the City's park system.

In accordance with the City's procurement policy, staff advertised a Request for Bids, and on March 10, 2022, the City Clerk's office received and opened two bids. The bids were reviewed by staff to determine if they were responsible to the bid requirements. Staff concluded the lowest bidder is in conformance with the bid documents and specifications based on the bid, and staff's review.

Mariposa Landscapes, Inc. was determined to be the lowest responsible and responsive bidder. The case bid amounts are included below:

BIDDER BID AMOUNT
Mariposa Landscapes, Inc., Irwindale, CA $308,072.44
Imperial Landscape, Inc., Guasti, CA $420,035.23
Furthermore, approval of this agreement is categorically exempt from environmental review in accordance with Section 15301, existing facilities. This section pertains to the maintenance of existing landscape facilities.

Redlands Regular Meeting 06-07-2022 1531 of 1593
ALTERNATIVES:

The City Council may elect not to award the agreement with Mariposa Landscapes, Inc., and provide alternative direction to staff.

STRATEGIC PLAN:

Supports Priority A, Objective 4: Enhance recreational program opportunities SUBMITTED BY:

Chris Boatman, Assistant City Manager
RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:

Kathleen Giorgianni, Senior Administrative Assistant
Fiscal Impact
Fiscal Year: 2021-2022
Revenue Generating: No
Appropriation Required Y/N: No
Amount: 308,072.44
Budgeted Y/N: Yes
Account No.: 101303
Discussion:

The agreement for the subject services is based on unit pricing. This type of agreement will allow the City to scale the services provided based on the approved budget. The costs are also offset by revenue collected from users to help support field maintenance.

Attachments
Clerk's Bid Report
Agreement
Redlands Regular Meeting 06-07-2022 1532 of 1593
Redlands Regular Meeting 06-07-2022 1533 of 1593

AGREEMENT TO PERFORM NON-PROFESSIONAL SERVICES

FOR IMPROVEMENT TO PUBLIC BUILDINGS AND GROUNDS
This agreement for the provision of sports field maintenance (“Agreement”) is made and entered in this 7th day of June, 2022 (“Effective Date”), by and between the City of Redlands, a municipal corporation (“City”) and Mariposa Landscapes, Inc., a California corporation (“Contractor”). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.” In consideration of the mutual promises contained herein, City and Contractor agree as follows:

ARTICLE 1 – ENGAGEMENT OF CONTRACTOR

1.1 City hereby engages Contractor to perform sports field maintenance services for City (the “Services”). The Services that Contractor shall perform are more particularly described in Exhibit “A,” titled “Scope of Services,” which is attached hereto and incorporated herein by this reference.

1.2 The Services shall be performed by Contractor in a professional manner, and Contractor represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional Contractors in the industry providing like and similar types of Services.

ARTICLE 2 – RESPONSIBILITIES OF CONTRACTOR

2.1 Contractor shall comply with all applicable federal, state and local laws and regulations in the performance of the Services including, but not limited, to all applicable Labor Code and prevailing wage laws and non-discrimination laws, including the Americans with Disabilities Act. Pursuant to Labor Code section 1773.2, copies of the prevailing rates of per diem wages as determined by the Director of the California Department of Industrial Relations for each craft, classification or type of worker needed to undertake the Services are on file at City’s Municipal Utilities and Engineering Department, located at the Civic Center, 35 Cajon Street, Suite 15A (Mailing: P.O. Box 3005), Redlands, California 92373.

2.2 Contractor acknowledges that if it violates the Labor Code provisions relating to prevailing wages that City may enforce such provisions by withholding payments to Contractor or its subcontractors pursuant to Labor Code section 1771.6.

2.3 If Contractor executes an agreement with a subcontractor to perform any portion of the Services, Contractor shall comply with Labor Code sections 1775 and 1777.7, and shall provide the subcontractor with copies of the provisions of Labor Code sections 1771, 1775, 1776, 1777.5, 1813 and 1815. Contractor acknowledges that the statutory provisions establishing penalties for failure to comply with state wage and hour laws and to pay prevailing wages may be enforced by City pursuant to Labor Code sections 1775 and 1813.

2.4 Contractor and its subcontractors shall comply with the provisions of Labor Code section 1776 regarding payroll records maintenance, certifications, retention and inspection.

2.5 Contractor acknowledges that eight (8) hours constitutes a legal day’s work pursuant to Redlands Regular Meeting 06-07-2022 1534 of 1593
Labor Code section 1810.

2.6 Contractor shall comply with the provisions of Labor Code section 1777.5 as to apprenticeships, and Labor Code sections 1771, 1775, 1776, 1777.5, 1813 and 1815.

2.7 Pursuant to Public Contract Code section 7103.5(b), Contractor offers and agrees to assign to City all rights, title and interest in and to all causes of action it may have under section 4 of the Clayton Act (15 U.S.C. section 15) or under the Cartwright Act (Chapter 2 (commencing with section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, goods or materials pursuant to this Agreement.

ARTICLE 3 – RESPONSIBILITIES OF CITY

3.1 City shall make available to Contractor information in its possession that may reasonably assist Contractor in performing the Services.

3.2 City designates Chris Boatman, Assistant City Manager, as City’s representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information, interpret and define City’s policies and decisions with respect to performance of the Services.

ARTICLE 4 – PERFORMANCE OF SERVICES

4.1 The Services shall commence as of the Effective Date of this Agreement. Contractor shall perform and complete the Services in a prompt and diligent manner in accordance with the schedule set forth in Exhibit “A,” which is attached hereto and incorporated herein by this reference.

4.2 The term of this Agreement shall commence on its Effective Date for one year (1) year “Initial Term”). The City shall have the option to extend the Initial Term of this Agreement by two (2) additional one-year terms (each, an “Extended Term”), on the same terms and conditions, by providing written notice to Contractor at least thirty (30) days prior to the expiration of the Initial Term or any Extended Term. The Initial Term and the Extended Terms are hereby collectively, referred to herein as the “Term” of this Agreement.

4.3 Contractor shall furnish a labor and material bond in the form attached hereto as Exhibit “B,” which is attached hereto and incorporated herein by this reference, in an amount equal to one hundred percent (100%) of the total compensation to be paid to Contractor pursuant to this Agreement.

ARTICLE 5 – PAYMENTS TO CONTRACTOR

5.1 The compensation for Contractor’s performance of the Services shall not exceed the amount of Three Hundred Eight Thousand Six Hundred Thirty One Dollars and Forty Six Cents ($308,631.46) for the Services provided during the Initial Term. Should this Agreement be renewed, the compensation for Contractor’s performance for the Services shall not exceed the amount of Three Hundred Eight Thousand Six Hundred Thirty One Dollars and Forty Six Cents ($308,631.46) for the first Extended Term; and Three Hundred Redlands Regular Meeting 06-07-2022 1535 of 1593
Eight Thousand Six Hundred Thirty One Dollars and Forty Six Cents ($308,631.46) for the second Extended Term, bringing the total possible amount of compensation to a not-to-exceed amount of Nine Hundred Twenty Five Thousand, Eight Hundred Ninety Four Dollars and Thirty Eight Cents ($925,894.38). For the Initial Term and each Extended Term, City shall pay Contractor on a time and materials basis up to the not to not-to-exceed amount in accordance with the rates specified in Exhibit “C,” titled “Price and Fee Bid,” which is attached hereto and incorporated herein by reference.

5.2 Contractor shall submit monthly invoices to City describing the Services performed during the preceding month. Contractor’s invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom.

City shall pay Contractor no later than thirty (30) days after receipt and approval by City of Contractor’s invoice.

5.3 Any notice or other communication required, or which may be given, pursuant to this Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date of delivery in person; (ii) five (5) days after deposit in first class registered mail, with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic mail transmission (including PDF), if confirmed with a copy sent contemporaneously by first class, certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a Party may provide notice in accordance with this section:

CITY CONTRACTOR
City Clerk Terry Noriega, President
City of Redlands Mariposa Landscapes, Inc.
35 Cajon Street 6232 Santos Diaz Street
P.O. Box 3005 (mailing) Irwindale, CA 91702
Redlands, CA 92373 [email protected]
[email protected] 626-960-0196
(909) 798-7531
ARTICLE 6 – INSURANCE AND INDEMNIFICATION

6.1 The following insurance coverage required by this Agreement shall be maintained by Contractor for the duration of its performance of the Services. Contractor shall not perform any Services unless and until the required insurance listed below is obtained by Contractor.

Contractor shall provide City with certificates of insurance and endorsements evidencing such insurance prior to commencement of the Services. Insurance policies shall include a provision prohibiting cancellation or modification of the policy except upon thirty (30) days prior written notice to City.

A. Workers’ Compensation and Employer’s Liability insurance in the amount that meets statutory requirements with an insurance carrier acceptable to City, or certification to City that Contractor is self-insured or exempt from the workers’ compensation laws of Redlands Regular Meeting 06-07-2022 1536 of 1593
the State of California. Contractor shall execute and provide City with Exhibit “D,” titled “Workers’ Compensation Insurance Certification,” which is attached hereto and incorporated herein by this reference, prior to performance of the Services.

B. Comprehensive General Liability insurance with carriers acceptable to City in the minimum amount of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) aggregate, for public liability, property damage and personal injury is required. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City.

C. Business Auto Liability coverage, with minimum limits of One Million Dollars ($1,000,000) per occurrence, combined single limit bodily injury liability and property damage liability. This coverage shall include all Contractor owned vehicles used in connection with Contractor’s provision of the Services, hired and non-owned vehicles, and employee non-ownership vehicles. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City.

6.2 Contractor shall defend, indemnify, and hold harmless City and its elected and appointed officials, employees and agents from and against any and all claims, losses and liability, including attorneys’ fees, arising from injury or death to persons or damage to property occasioned by any negligent act or omission by, or the willful misconduct of, Contractor, or its officers, employees and agents in performing the Services.

ARTICLE 7 – CONFLICTS OF INTEREST

7.1 Contractor covenants and represents that it does not have any investment or interest in any real property that may be the subject of this Agreement or any other source of income, interest in real property or investment that would be affected in any manner or degree by the performance of Contractor’s Services. Contractor further covenants and represents that in the performance of its duties hereunder, no person having any such interest shall perform any Services under this Agreement.

7.2 Contractor agrees it is not a designated employee within the meaning of the Political Reform Act because Contractor:

A. Does not make a governmental decision whether to:
(i) approve a rate, rule or regulation, or adopt or enforce a City law; (ii) issue, deny, suspend or revoke any City permit, license, application, certification, approval, order or similar authorization or entitlement; (iii) authorize City to enter into, modify or renew a contract; (iv) grant City approval to a contract that requires City approval and to which City is a party, or to the specifications for such a contract; (v) grant City approval to a plan, design, report, study or similar item; (vi) adopt, or grant City approval of, policies, standards or guidelines for City or for any subdivision thereof.

Redlands Regular Meeting 06-07-2022 1537 of 1593
B. Does not serve in a staff capacity with City and in that capacity, participate in making a governmental decision or otherwise perform the same or substantially the same duties for City that would otherwise be performed by an individual holding a position specified in City’s Conflict of Interest Code under Government Code section 87302.

7.3 In the event City determines that Contractor must disclose its financial interests, Contractor shall complete and file a Fair Political Practices Commission Form 700, Statement of Economic Interests, with the City Clerk’s office pursuant to the written instructions provided by the City Clerk.

ARTICLE 8 – GENERAL CONSIDERATIONS

8.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys’ fees, including fees for the use of in-house counsel by a Party.

8.2 Contractor shall not assign any of the Services, except with the prior written approval of City and in strict compliance with the terms and conditions of this Agreement. Any assignment or attempted assignment without such prior written consent may, in the sole discretion of City, results in City’s immediate termination of this Agreement.

8.3 Contractor is for all purposes under this Agreement an independent contractor and shall perform the Services as an independent contractor. Neither City nor any of its agents shall have control over the conduct of Contractor or Contractor’s employees, except as herein set forth. Contractor shall supply all necessary tools and instrumentalities required to perform the Services. Assigned personnel employed by Contractor are for its account only, and in no event shall Contractor or personnel retained by it be deemed to have been employed by City or engaged by City for the account of, or on behalf of City. Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent, nor shall Contractor have any authority, express or implied, to bind City to any obligation.

8.4 This Agreement may be terminated by City, in its sole discretion, by providing not less than five (5) days prior written notice to Contractor of City’s intent to terminate. If this Agreement is terminated by City, an adjustment to Contractor’s compensation shall be made, but (i) no amount shall be allowed for anticipated profit or unperformed Services, and (ii) any payment due Contractor at the time of termination may be adjusted to the extent of any additional costs to City occasioned by any default by Contractor. Upon receipt of a termination notice, Contractor shall immediately discontinue its provision of the Services and, within five (5) days of the date of the termination notice, deliver or otherwise make available to City, copies (in both hard copy and electronic form, where applicable) of project related data, design calculations, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by Contractor in performing the Services. Contractor shall be compensated on a pro-rata basis for Services completed up to the date of termination.

Redlands Regular Meeting 06-07-2022 1538 of 1593

8.5 Contractor shall maintain books, ledgers, invoices, accounts and other records and documents evidencing costs and expenses related to the Services for a period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor pursuant to this Agreement. Such books shall be available at reasonable times for examination by City at the office of Contractor.

8.6 This Agreement, including the Exhibits incorporated herein by reference, represents the entire agreement and understanding between the Parties as to the matters contained herein, and any prior negotiations, written proposals or verbal agreements relating to such matters are superseded by this Agreement. Except as otherwise provided for herein, any amendment to this Agreement shall be in writing, approved by City and signed by City and Contractor.

8.7 This Agreement shall be governed by and construed in accordance with the laws of the State of California, without regard to its conflicts of laws provisions. The Parties agree that all actions or proceedings arising in connection with this Agreement shall be tried and litigated only in the state courts located in San Bernardino County, California, and the federal courts located in Riverside County, California.

8.8 If one or more of the sentences, clauses, paragraphs or sections contained in this Agreement is declared invalid, void or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair or invalidate the remaining sentences, clauses, paragraphs or sections contained herein, unless to do so would deprive a Party of a material benefit of its bargain under this Agreement.

IN WITNESS WHEREOF, duly authorized representatives of City and Contractor have signed in confirmation of this Agreement.

CITY OF REDLANDS MARIPOSA LANDSCAPES, INC.

By: ___________________________ By: _________________________ Paul T. Barich, Mayor Terry Noriega, President
ATTEST:
___________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1539 of 1593
EXHIBIT "A"

SCOPE OF SERVICES
Various maintenance items are performed weekly, while other maintenance items are performed annually, semi-annually or 10 months per year, depending upon game schedules. The successful bidder will have ten (10) years of experience in maintaining similar sports fields, all personnel providing on-site services will be required to wear company uniform shirts and photo ID badges. Emergency Service response time must be no longer than 60 minutes from call to site arrival, and may occur from time to time.

Tasks such as field striping, field dragging and infield leveling may be required on Saturdays and Sundays, depending upon game schedules. A schedule will be provided to contractor prior to issuance of Purchase Order.

All equipment, vehicles, fuel fees, trip charges, labor and materials, etc. are to be supplied by contractor and included in bid pricing.

Irrigation repairs up to $500.00 shall be performed by the contractor (time and material). Contractor shall defer to city staff for irrigation repairs exceeded $500.00.

Pest control (gophers) and tree maintenance are not included in this Scope of Work. Please see definitions of service below.

PARK NAME LOCATION ACRES
Brookside Park 1631 Brookside Avenue 1.25
Texonia Park 1321 Texas Street 2.24
Crafton Park 1741 Independence Avenue 2
Israel Beal Park 140 W. Riverview Drive 1.42
Community Park 1535 N. Church Street 7.65
Orangewood Field 515 Texas Street 3.01
Clement Field 400 Block of San Bernardino Avenue 4.92
Redlands Regular Meeting 06-07-2022 1540 of 1593
EXHIBIT "B"

LABOR AND MATERIAL BOND
Whereas, the City of Redlands, State of California, and (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to Description of Improvement Services to Public Buildings and/or grounds (the “Work”), which said agreement, dated , 20XX, and titled as “Agreement to Perform Non-Professional Services for Improvement to Public Builds and Grounds” is hereby referred to and made a part hereof; and
Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of Written dollar amount Dollars ($ ) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 20__.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:
_______________________________________
________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone( ) ___________________________
Redlands Regular Meeting 06-07-2022 1541 of 1593
EXHIBIT “C”
(“Fee Schedule/ Price and Fee Bid”)

SPORTS FIELD MAINTENANCE
FCS02232022KG

BASE BID A - IRRIGATION REPAIRS ALL PARKS
Item
No. Brief Description
*A
Annual
Quantity
*B
Unit Price Per
Hour
*C
Total Price in
Figures
A1 Irrigation Repair 100 Hours $70.79 $7078.01
IRRIGATION REPAIRS – HOURLY RATE TO INCLUDE PARTS AND LABOR

Markup on Parts 15%
BASE BID B – BROOKSIDE PARK (1.25 ACRES)
Item
No. Brief Description
*A
Annual
Quantity
*B
Unit Price
Per
*C
Total Price in Figures
B1 Turf Mowing, Edging, String
Trimming and Blowing 40 $48.84 $1953.73
B2 Irrigation Test/Monitor 40 $32.50 $1300.00
B3
Field Striping (performed 10
months per year, 4 times per
month)
40 $113.97 $4558.69
B4 Lighting Test/Monitor (once
monthly) 12 $47.50 $570.00
B5 Fertilizing 2 $728.34 $1456.68
B6 Aerification 1 $427.30 $427.30
B7 Verti-cutting 1 $2504.43 $2504.43
B8 Thatching 1 $2504.43 $2504.43
B9 Over-seeding 1 $3043.46 $3043.46
B10 Top Dressing 1 $1846.23 $1846.23
*"A" x "B" = "C"
TOTAL $20,124.95
Redlands Regular Meeting 06-07-2022 1542 of 1593

SPORTS FIELD MAINTENANCE
FCS02232022KG
BASE BID C - TEXONIA PARK (2.24 ACRES)
Item
No. Brief Description
*A
Annual
Quantity
*B
Unit Price
Per
*C
Total Price in
Figures
C1 Turf Mowing, Edging, String Trimming
and Blowing 40 $90.65 $3626.11
C2 Irrigation Test/Monitor 40 $32.50 $1300.00
C Field Striping (performed 10 months per
year, 4 times per month) 40 $211.52 $8460.93
C4 Lighting Test/Monitor (once monthly) 12 $87.50 $570.00 C5 Fertilizing 2 $1351.79 $2703.58
C6 Aerification 1 $0.0078475 $793.06
C7 Verti-cutting 1 $0.0459949 $4648.21
C8 Thatching 1 $0.0459949 $4648.21
C9 Over-seeding 1 $5648.66 $5648.66
C10 Top Dressing 1 $3426.60 $3426.60
*"A" x "B" = "C"
TOTAL $35,825.36
Redlands Regular Meeting 06-07-2022 1543 of 1593

SPORTS FIELD MAINTENANCE
FCS02232022KG
BASE BID D - CRAFTON PARK (2 ACRES)
Item
No. Brief Description
*A
Annual
Quantity
*B
Unit Price
Per
*C
Total Price in
Figures
D1 Turf Mowing, Edging, String Trimming and
Blowing 40 $77.76 $3110.33
D2 Irrigation Test/Monitor 40 $32.50 $1300.00
D3 Field Striping (performed 10 months per
year, 4 times per month) 40 $181.44 $7257.44
D4 Lighting Test/Monitor (once monthly) 12 $47.50 $570.00 D5 Fertilizing 2 $1159.51 $2319.02
D6 Aerification 1 $680.26 $680.26
D7 Verti-cutting 1 $3987.04 $3987.04
D8 Thatching 1 $3987.04 $3987.04
D9 Over-seeding 1 $3426.60 $3426.60
D10 Top Dressing 1 $2939.19 $2939.19
*"A" x "B" = "C"
TOTAL $29,576.92
Redlands Regular Meeting 06-07-2022 1544 of 1593

SPORTS FIELD MAINTENANCE
FCS02232022KG
BASE BID E - ISRAEL BEAL (1.42 ACRES)
Item
No. Brief Description
*A
Annual
Quantity
*B
Unit Price
Per
*C
Total Price in
Figures
E1 Turf Mowing, Edging, String Trimming and
Blowing 40 $55.88 $2235.06
E2 Irrigation Test/Monitor 40 $32.50 $1300.00
E3
Field Striping/Infield Leveling/Dragging
(performed 10 months per year, 4 times per
month)
40 $130.38 $5215.14
E4 Lighting Test/Monitor (once monthly) 12 $47.50 $570.00 E5 Fertilizing 2 $833.22 $1666.44
E6 Aerification 1 $488.83 $488.83
E7 Verti-cutting 1 $2865.06 $2865.06
E8 Thatching 1 $2865.06 $2865.06
E9 Over-seeding 1 $3481.72 $3481.72
E10 Top Dressing 1 $2112.08 $2112.08
*"A" x "B" = "C"
TOTAL $22,799.39
Redlands Regular Meeting 06-07-2022 1545 of 1593

SPORTS FIELD MAINTENANCE
FCS02232022KG
BASE BID F – COMMUNITY PARK (7.65 ACRES)
Item
No. Brief Description
*A
Annual
Quantity
*B
Unit Price
Per
*C
Total Price in
Figures
F1 Turf Mowing, Edging, String Trimming and
Blowing 40 $241.48 $9659.22
F2 Irrigation Test/Monitor 40 $97.50 $3900.00
F3
Field Striping/Infield Leveling/Dragging
(performed 10 months per year, 4 times per
month)
40 $563.45 $22538.17
F4 Lighting Test/Monitor (once monthly) 12 $142.50 $1710.00 F5 Fertilizing 2 $3600.89 $7201.78
F6 Aerification 1 $2112.55 $2112.55
F7 Verti-cutting 1 $12381.88 $12381.88
F8 Thatching 1 $12381.88 $12381.88
F9 Over-seeding 1 $15046.85 $15046.85
F10 Top Dressing 1 $9127.74 $9127.74
*”A” x “B” = “C”
TOTAL $96,060.07
Redlands Regular Meeting 06-07-2022 1546 of 1593

SPORTS FIELD MAINTENANCE
FCS02232022KG
BASE BID G – ORANGEWOOD FIELDS (3.01 ACRES)
Item
No. Brief Description
*A
Annual
Quantity
*B
Unit Price
Per
*C
Total Price in
Figures
G1 Turf Mowing, Edging, String Trimming and
Blowing 40 $89.48 $3579.22
G2 Irrigation Test/Monitor 40 $32.50 $1300.00
G3
Field Striping/Field Leveling/Dragging
(performed 10 months per year, 4 times per
month)
40 $208.79 $8351.52
G4 Lighting Test/Monitor (once monthly) 12 $47.50 $570.00 G5 Fertilizing 2 $1334.31 $2668.62
G6 Aerification 1 $782.81 $782.81
G7 Verti-cutting 1 $4588.11 $4588.11
G8 Thatching 1 $4588.11 $4588.11
G9 Over-seeding 1 $5575.61 $5575.61
G10 Top Dressing 1 $3382.29 $3382.29
*"A" x "B" = "C"
TOTAL $35,386.29
Redlands Regular Meeting 06-07-2022 1547 of 1593

SPORTS FIELD MAINTENANCE
FCS02232022KG
BASE BID H – CLEMENT FIELDS (4.92 ACRES)
Item
No. Brief Description
*A
Annual
Quantity
*B
Unit Price
Per
*C
Total Price in
Figures
H1 Turf Mowing, Edging, String Trimming and
Blowing 40 $166.85 $6673.93
H2 Irrigation Test/Monitor 40 $65.00 $2600.00
H3 Field Striping/Infield Leveling (performed 10
months per year, 4 times per month) 40 $389.31 $15572.49 H4 Lighting Test/Monitor (once monthly) 12 $95.00 $1140.00 H6 Aerification 1 $1459.64 $1459.64
H7 Verti-cutting 1 $8555.12 $8555.12
H8 Thatching 1 $8555.12 $8555.12
H9 Over-seeding 1 $10396.45 $10396.45
H10 Top Dressing 1 $6306.71 $6306.71
*"A" x "B" = "C"
TOTAL $61,259.46
Redlands Regular Meeting 06-07-2022 1548 of 1593

SPORTS FIELD MAINTENANCE
FCS02232022KG

BID SUBTOTALS
A Irrigation Repairs $ 7,078.01
B Brookside Park $20,164.95
C Texonia Park $35,825.36
D Crafton Park $29,576.92
E Isreal Beal Park $22,799.39
F Community Park $96,060.07
G Orangewood Fields $35,386.29
H Clement Fields $61,259.46
Redlands Regular Meeting 06-07-2022 1549 of 1593
EXHIBIT “D”
WORKERS’ COMPENSATION INSURANCE CERTIFICATION
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
(a) By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations, a certificate of consent to self-insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

MARIPOSA LANDSCAPES, INC.

By: Date: _______ __________
Terry Noriega, President
Redlands Regular Meeting 06-07-2022 1550 of 1593
City Council/Successor Agency Meeting K. 11.

DATE: 06/07/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Single Source Agreement with Yunex, LLC for Traffic Signal Systems Maintenance services in an amount not-to-exceed $2,000,000 and determination that the project is not subject to environmental review pursuant to Section 15301(c) of the State's guidelines implementing the California Environmental Quality Act (Assistant City Manager Boatman)
MOTION(S):

If the City Council determines that staff’s recommendation is appropriate, the following motions are provided:

I move that the City Council determine that the project is categorically exempt from environmental review in accordance with Section 15301(c) of the State's guidelines implementing the California Environmental Quality Act.

1. I move to approve the Single Source Agreement with Yunex, LLC for Traffic Signal Systems Maintenance in an annual amount not-to-exceed $400,0000 for a period of two years, with three additional one-year renewal options, for a possible agreement total amount not-to-exceed $2,000,000.

2. RECOMMENDATION:

Staff recommends that the City Council approve the Single Source Agreement with Yunex, LLC for Traffic Signal Systems Maintenance in an annual amount not to exceed $400,000 for an initial term of two years, with the option to extend the initial term of the agreement by three (3) additional one-year terms, for a possible agreement total not-to-exceed $2,000,000. Staff further recommends that the City Council determine that the project is categorically exempt from environmental review in accordance with Section 15301(c) of the State's guidelines implementing the California Environmental Quality Act.

Redlands Regular Meeting 06-07-2022 1551 of 1593
DISCUSSION:

The Facilities and Community Services Departments' Street Division maintains seventy-two traffic signals with three additional signals scheduled for installation in 2022. With the introduction of new signal technology, maintenance has become more specialized and difficult to maintain with city staff. In addition, the development of the Redlands Passenger Rail Project (RPRP) coordinated signal systems were introduced into the existing system that require specialized outside contractual services to establish and maintain. In order to address the growing demand and technical expertise required to operate the new systems, staff advertised a request for proposals for traffic signal maintenance. Yunex, LLC was one of six firms that responded to the City's Request for Proposal (RFP) for Traffic Signal Systems Maintenance on January 27, 2022. Written proposals were evaluated and ranked, based on firm qualifications and responsiveness to the requirements of the City's RFP for Traffic Signal Systems Maintenance. Based on the firm's unique qualifications, Yunex, LLC was selected as the firm most qualified to perform the services as requested in the City's RFP.

Upon further review of the firms qualifications, it was determined that a single source agreement with Yunex, LLC was appropriate for the specialized contractual services requested by the City. Staff recommends that a single source award is appropriate because of the highly specialized nature of the McCain traffic signal cabinets and the limited number of vendors in the vicinity who are qualified to work on these systems. Further, Yunex, LLC was the only RFP respondent to include an existing strong supplier relationship with McCain (Traffic Signal System manufacturer of the RPRP), the resources to successfully obtain parts and IT coordination on the new RPRP Traffic Signal Systems, and the only company with existing staff that has the professional experience and technical training to successfully complete the required traffic signal maintenance and repairs to all traffic signal systems city-wide. The attached Single Source Agreement includes city-wide maintenance of all traffic signals.

The cost schedule includes unit pricing for parts, labor, and services, including emergency call-outs. Standard industry costs for traffic signal cabinet replacement range from $20,000 to $100,000. By the same metric, traffic signal poles range from $1,000 to $17,000. Annual expenditures will be made based on need and funding availability within the approved operating budget.

Approval of the Single Source Agreement with Yunex LLC for Traffic Signal Systems Maintenance has been determined to be categorically exempt from environmental review pursuant to CEQA in accordance with Section 15301(c) such that the agreement will allow maintenance and installation on existing facilities.

ALTERNATIVES:

Redlands Regular Meeting 06-07-2022 1552 of 1593
The City Council may elect not to award the agreement with Yunex, LLC and provide alternative direction to staff.

STRATEGIC PLAN:

Supports Priority D - Sustainability
SUBMITTED BY:

Chris Boatman, Assistant City Manager
RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:

Kathleen Giorgianni, Senior Administrative Assistant
Fiscal Impact
Fiscal Year: FY 2022-23
Amount: 400,000
Budgeted Y/N: Yes
Account No.: 101304
Discussion:

Funding for this service is included in the Streets and Electrical Operating Budget request for FY 2022-24. The cost schedule for the agreement includes unit pricing and the work that is authorized in future years will be based on available funding within the approved budget.

Attachments
A. Agreement with Yunex
B. Sole-Single Source Request Form
Redlands Regular Meeting 06-07-2022 1553 of 1593

AGREEMENT TO PERFORM NON-PROFESSIONAL SERVICES

FOR IMPROVEMENT TO PUBLIC BUILDINGS AND GROUNDS
This agreement for the provision of traffic signal systems maintenance (“Agreement”) is made and entered in this 7th day of June, 2022 (“Effective Date”), by and between the City of Redlands, a municipal corporation and general law city (“City”) and Yunex, LLC, a California limited liability company (“Contractor”). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.” In consideration of the mutual promises contained herein, City and Contractor agree as follows:

ARTICLE 1 – ENGAGEMENT OF CONTRACTOR

1.1 City hereby engages Contractor to perform traffic signal systems maintenance services for City (the “Services”). The Services that Contractor shall perform are more particularly described in Exhibit “A,” titled “Scope of Services,” which is attached hereto and incorporated herein by this reference.

1.2 The Services shall be performed by Contractor in a professional manner, and Contractor represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional Contractors in the industry providing like and similar types of Services.

ARTICLE 2 – RESPONSIBILITIES OF CONTRACTOR

2.1 Contractor shall comply with all applicable federal, state and local laws and regulations in the performance of the Services including, but not limited, to all applicable Labor Code and prevailing wage laws and non-discrimination laws, including the Americans with Disabilities Act. Pursuant to Labor Code section 1773.2, copies of the prevailing rates of per diem wages as determined by the Director of the California Department of Industrial Relations for each craft, classification or type of worker needed to undertake the Services are on file at City’s Municipal Utilities and Engineering Department, located at the Civic Center, 35 Cajon Street, Suite 15A (Mailing: P.O. Box 3005), Redlands, California 92373.

2.2 Contractor acknowledges that if it violates the Labor Code provisions relating to prevailing wages that City may enforce such provisions by withholding payments to Contractor or its subcontractors pursuant to Labor Code section 1771.6.

2.3 If Contractor executes an agreement with a subcontractor to perform any portion of the Services, Contractor shall comply with Labor Code sections 1775 and 1777.7, and shall provide the subcontractor with copies of the provisions of Labor Code sections 1771, 1775, 1776, 1777.5, 1813 and 1815. Contractor acknowledges that the statutory provisions establishing penalties for failure to comply with state wage and hour laws and to pay prevailing wages may be enforced by City pursuant to Labor Code sections 1775 and 1813.

2.4 Contractor and its subcontractors shall comply with the provisions of Labor Code section 1776 regarding payroll records maintenance, certifications, retention and inspection.

Redlands Regular Meeting 06-07-2022 1554 of 1593

2.5 Contractor acknowledges that eight (8) hours constitutes a legal day’s work pursuant to Labor Code section 1810.

2.6 Contractor shall comply with the provisions of Labor Code section 1777.5 as to apprenticeships, and Labor Code sections 1771, 1775, 1776, 1777.5, 1813 and 1815.

2.7 Pursuant to Public Contract Code section 7103.5(b), Contractor offers and agrees to assign to City all rights, title and interest in and to all causes of action it may have under section 4 of the Clayton Act (15 U.S.C. section 15) or under the Cartwright Act (Chapter 2 (commencing with section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, goods or materials pursuant to this Agreement.

ARTICLE 3 – RESPONSIBILITIES OF CITY

3.1 City shall make available to Contractor information in its possession that may reasonably assist Contractor in performing the Services.

3.2 City designates Chris Boatman, Assistant City Manager, as City’s representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information, interpret and define City’s policies and decisions with respect to performance of the Services.

ARTICLE 4 – PERFORMANCE OF SERVICES

4.1 The term of this Agreement shall be for a period of three (3) years from the Effective Date of this Agreement (the “Initial Term”). The City shall have the option to extend the Initial Term of this Agreement by two (2) additional one-year terms (each, an “Extended Term”), on the same terms and conditions, by providing written notice to Contractor at least thirty (30) days prior to the expiration of the Initial Term or any Extended Term. The Initial Term and the Extended Terms are hereby collectively, referred to herein as the “Term” of this Agreement.

4.2 Contractor shall furnish a labor and material bond in the form attached hereto as Exhibit “B,” which is attached hereto and incorporated herein by this reference, in an amount equal to one hundred percent (100%) of the total compensation to be paid to Contractor pursuant to this Agreement.

ARTICLE 5 – PAYMENTS TO CONTRACTOR

5.1 The compensation for Contractor’s performance of the Services shall not exceed the amount of One Million Two Hundred Thousand Dollars ($1,200,000) for the Services provided during the Initial Term. Should this Agreement be extended, the compensation for Contractor’s performance for the Services shall not exceed the amount of Four Hundred Thousand Dollars ($400,000) for the first Extended Term; and Four Hundred Thousand ($400,000) for the second Extended Term, bringing the total possible amount of compensation to a not-to-exceed amount of Two Million Dollars ($2,000,000). For the Initial Term and each Extended Term, City shall pay Contractor on a time and materials Redlands Regular Meeting 06-07-2022 1555 of 1593
basis up to the not to not-to-exceed amount in accordance with the rates specified in Exhibit “C,” titled “Price and Fee Bid,” which is attached hereto and incorporated herein by reference.

5.2 Contractor shall submit monthly invoices to City describing the Services performed during the preceding month. Contractor’s invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom.

City shall pay Contractor no later than thirty (30) days after receipt and approval by City of Contractor’s invoice.

5.3 Any notice or other communication required, or which may be given, pursuant to this Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date of delivery in person; (ii) five (5) days after deposit in first class registered mail, with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic mail transmission (including PDF), if confirmed with a copy sent contemporaneously by first class, certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a Party may provide notice in accordance with this section:

CITY CONTRACTOR
City Clerk Michael J. Hutchens, Operations Manager
City of Redlands Yunex, LLC
35 Cajon Street 2250 Business Way
P.O. Box 3005 (mailing) Riverside, CA 92501
Redlands, CA 92373 [email protected]
[email protected] 951-784-6600
(909) 798-7531 951-784-6700
ARTICLE 6 – INSURANCE AND INDEMNIFICATION

6.1 The following insurance coverage required by this Agreement shall be maintained by Contractor for the duration of its performance of the Services. Contractor shall not perform any Services unless and until the required insurance listed below is obtained by Contractor.

Contractor shall provide City with certificates of insurance and endorsements evidencing such insurance prior to commencement of the Services. Insurance policies shall include a provision prohibiting cancellation or modification of the policy except upon thirty (30) days prior written notice to City.

A. Workers’ Compensation and Employer’s Liability insurance in the amount that meets statutory requirements with an insurance carrier acceptable to City, or certification to City that Contractor is self-insured or exempt from the workers’ compensation laws of the State of California. Contractor shall execute and provide City with Exhibit “D,” titled “Workers’ Compensation Insurance Certification,” which is attached hereto and incorporated herein by this reference, prior to performance of the Services.

B. Comprehensive General Liability insurance with carriers acceptable to City in the Redlands Regular Meeting 06-07-2022 1556 of 1593
minimum amount of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) aggregate, for public liability, property damage and personal injury is required. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City.

C. Business Auto Liability coverage, with minimum limits of One Million Dollars ($1,000,000) per occurrence, combined single limit bodily injury liability and property damage liability. This coverage shall include all Contractor owned vehicles used in connection with Contractor’s provision of the Services, hired and non-owned vehicles, and employee non-ownership vehicles. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City.

6.2 Contractor shall defend, indemnify, and hold harmless City and its elected and appointed officials, employees and agents from and against any and all claims, losses and liability, including attorneys’ fees, arising from injury or death to persons or damage to property occasioned by any negligent act or omission by, or the willful misconduct of Contractor, or its officers, employees and agents in performing the Services.

ARTICLE 7 – CONFLICTS OF INTEREST

7.1 Contractor covenants and represents that it does not have any investment or interest in any real property that may be the subject of this Agreement or any other source of income, interest in real property or investment that would be affected in any manner or degree by the performance of Contractor’s Services. Contractor further covenants and represents that in the performance of its duties hereunder, no person having any such interest shall perform any Services under this Agreement.

7.2 Contractor agrees it is not a designated employee within the meaning of the Political Reform Act because Contractor:

A. Does not make a governmental decision whether to:
(i) approve a rate, rule or regulation, or adopt or enforce a City law; (ii) issue, deny, suspend or revoke any City permit, license, application, certification, approval, order or similar authorization or entitlement; (iii) authorize City to enter into, modify or renew a contract; (iv) grant City approval to a contract that requires City approval and to which City is a party, or to the specifications for such a contract; (v) grant City approval to a plan, design, report, study or similar item; (vi) adopt, or grant City approval of, policies, standards or guidelines for City or for any subdivision thereof.

B. Does not serve in a staff capacity with City and in that capacity, participate in making a governmental decision or otherwise perform the same or substantially the same duties for City that would otherwise be performed by an individual holding a position specified in City’s Conflict of Interest Code under Government Code section 87302.

Redlands Regular Meeting 06-07-2022 1557 of 1593

7.3 In the event City determines that Contractor must disclose its financial interests, Contractor shall complete and file a Fair Political Practices Commission Form 700, Statement of Economic Interests, with the City Clerk’s office pursuant to the written instructions provided by the City Clerk.

ARTICLE 8 – GENERAL CONSIDERATIONS

8.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys’ fees, including fees for the use of in-house counsel by a Party.

8.2 Contractor shall not assign any of the Services, except with the prior written approval of City and in strict compliance with the terms and conditions of this Agreement. Any assignment or attempted assignment without such prior written consent may, in the sole discretion of City, results in City’s immediate termination of this Agreement.

8.3 Contractor is for all purposes under this Agreement an independent contractor and shall perform the Services as an independent contractor. Neither City nor any of its agents shall have control over the conduct of Contractor or Contractor’s employees, except as herein set forth. Contractor shall supply all necessary tools and instrumentalities required to perform the Services. Assigned personnel employed by Contractor are for its account only, and in no event shall Contractor or personnel retained by it be deemed to have been employed by City or engaged by City for the account of, or on behalf of City. Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent, nor shall Contractor have any authority, express or implied, to bind City to any obligation.

8.4 This Agreement may be terminated by City, in its sole discretion, by providing not less than five (5) days prior written notice to Contractor of City’s intent to terminate. If this Agreement is terminated by City, an adjustment to Contractor’s compensation shall be made, but (i) no amount shall be allowed for anticipated profit or unperformed Services, and (ii) any payment due Contractor at the time of termination may be adjusted to the extent of any additional costs to City occasioned by any default by Contractor. Upon receipt of a termination notice, Contractor shall immediately discontinue its provision of the Services and, within five (5) days of the date of the termination notice, deliver or otherwise make available to City, copies (in both hard copy and electronic form, where applicable) of project related data, design calculations, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by Contractor in performing the Services. Contractor shall be compensated on a pro-rata basis for Services completed up to the date of termination.

8.5 Contractor shall maintain books, ledgers, invoices, accounts and other records and documents evidencing costs and expenses related to the Services for a period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor Redlands Regular Meeting 06-07-2022 1558 of 1593
pursuant to this Agreement. Such books shall be available at reasonable times for examination by City at the office of Contractor.

8.6 This Agreement, including the Exhibits incorporated herein by reference, represents the entire agreement and understanding between the Parties as to the matters contained herein, and any prior negotiations, written proposals or verbal agreements relating to such matters are superseded by this Agreement. Except as otherwise provided for herein, any amendment to this Agreement shall be in writing, approved by City and signed by City and Contractor.

8.7 This Agreement shall be governed by and construed in accordance with the laws of the State of California, without regard to its conflicts of laws provisions. The Parties agree that all actions or proceedings arising in connection with this Agreement shall be tried and litigated only in the state courts located in San Bernardino County, California, and the federal courts located in Riverside County, California.

8.8 If one or more of the sentences, clauses, paragraphs or sections contained in this Agreement is declared invalid, void or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair or invalidate the remaining sentences, clauses, paragraphs or sections contained herein, unless to do so would deprive a Party of a material benefit of its bargain under this Agreement.

IN WITNESS WHEREOF, duly authorized representatives of City and Contractor have signed in confirmation of this Agreement.

CITY OF REDLANDS YUNEX, LLC
By: ___________________________ By: ________________________________ Paul T. Barich, Mayor Michael Hutchens, Operations Manager ATTEST:
___________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-07-2022 1559 of 1593
EXHIBIT "A"

SCOPE OF SERVICES
A. General
The work to be done, in general, consists of routine preventative maintenance, extraordinary maintenance, and additional maintenance of traffic signal systems for locations that are the responsibility of the City of Redlands. The Contractor is to furnish all tools, equipment, supplies, apparatus, facilities, labor and material, transportation, and perform all work necessary to maintain in a good working order all traffic signal facilities, safety lights, preemption devices, video detection cameras and video processors (where present) and solar lighted crosswalks. The Contractor shall provide a written inventory of all maintenance items.

The initial contract for this work will be for a period of 2 years from the Notice of Award, with an additional three one-year extensions.

B. Standard Specifications
All services to be provided by the Contractor pursuant to this Agreement shall be provided by personnel experienced in their respective fields and in a manner consistent with the standards of care, diligence and skill ordinarily exercised by Contractors in similar circumstances in accordance with sound professional practices.

All work performed or equipment or parts supplied by the Contractor shall be subject to the inspection and approval of the City, or an authorized representative. Failure to pass inspection on any maintenance, repair and/or service item will result in non-payment for that item until such time as the Contractor can prove work completed to the satisfaction of the Project Manager.

C. Personnel
The Contractor shall provide at least one (1) full-time signal maintenance technician level III certification as a Traffic Signal Technician from the International Municipal Signal Association (IMSA) for each fifty (50) maintained signals locations unless otherwise approved by the City. All workers shall have IMSA Work Zone Safety certification and State mandated National Electrical Contractors (NEC) certification, unless otherwise approved by the City. Skilled laborers can make hardware repairs under the direct supervision of NEC/IMSA level III certified Traffic Signal Technician. The City reserves the right at all times to approve or deny the Contractor's assignment of personnel to the City. If appropriate, the Contractor shall replace any personnel assigned to the City whose performance or behavior is considered unacceptable by the City or the standards established per the proposal.

The contractor shall, at a minimum, have on their staff three (3) NEC/IMSA certified technicians’ level III who are familiar with:
• NEMA TS 1, NEMA TS 2 Cabinets & Controllers
• Caltrans type 170 Cabinets & Controllers
• ATC Cabinets & Controllers
• Econolite’s ASC/2, ASC/3, ASC-8000 controllers
• McCain’s ATC Flex Controllers
• ATC Preempt Cabinets with special SIU interface
Redlands Regular Meeting 06-07-2022 1560 of 1593
Each technician shall have A MINIMUM OF THREE (3) YEARS of experience working and troubleshooting on such controllers, cabinets and ITS communications equipment. The IMSA and NEC certifications held by employees shall be kept in good standing and shall be maintained current throughout the entire duration of the contract.

When requested by the City, the Contractor may be required to assist in the field inspection of new installations.

Contractor shall provide names and qualifications of current staff members who are proposed for this project indicating their level of certifications and job classifications. Bidders who fail to demonstrate they have qualified technicians currently on staff will be considered nonresponsive.

The Contractor shall update employee lists annually or as personnel changes. The IMSA and NEC certifications held by employees shall be kept in good standing and shall be maintained current throughout the entire duration of the contract.

The Contractor shall use only NEC/IMSA level III certified technicians to service, maintain, and make necessary repairs or installations to traffic signal devices within the confines of the controller cabinet. Skilled laborers can make hardware repairs under the direct supervision of the NEC/IMSA Technician Level III.

D. Equipment, Materials and Parts
The Contractor shall have available and readily accessible all required tools, equipment, apparatus, facilities, traffic control, skilled labor services and materials, etc., to perform all work necessary to maintain traffic signal facilities in good working order. All work performed, or equipment, parts, or materials supplied shall be subject to the inspection and approval of the City or his designated representative.

An inventory of all materials, parts and units owned and stocked by the City at the start of the Contract period shall be made by the Contractor. This will enable the Contractor to determine what materials, parts and units the City has on stock for replacement and/or repair of existing facilities.

It shall be the responsibility of the Contractor to stock such additional materials, parts, or units as may be needed for normal maintenance and repair of the traffic signal equipment. In addition to the City's owned and spare equipment, the Contractor shall provide and be equipped with spare parts sufficient to place the signal system back in operation for ordinary trouble calls, including sensing devices for induction loop detectors.

For every twenty-five (25) intersections, the Contractor shall have on-hand:

One (1) ASC/3 Type 2 Econolite System Controller
One (1) MMU (malfunction management unit)
One (1) ATC CMU (conflict monitor unit)
Two (2) ATC SIU
Two (2) TS 2 BIU
One (1) CMU (conflict monitor unit)
One (1) McCain ATC Flex Controller
Redlands Regular Meeting 06-07-2022 1561 of 1593
In the event of an equipment malfunction, the original equipment shall be returned to service within 30 working days, or an approved replacement controller shall be installed.

The Contractor's service bucket trucks shall be equipped with spare parts sufficient to place the signal system back in operation for ordinary trouble calls. This shall include sensing devices for induction loop detectors and emergency vehicle preemption detectors. The service trucks shall also be equipped with spare parts such as spare LED red, green and yellow, balls and arrows lights, pedestrian signal LED lights, pedestrian push buttons, aluminum ‘1A’ pole and housing, load switches, and program boards. Equipment shall also include, but not be limited to, test apparatus used for diagnostic purposes, a computer laptop and applicable software and tools to make necessary repairs as directed by the City.

In the event of a traffic signal equipment malfunction, the Contractor shall install a contractor owned spare equipment for temporary use while malfunctioning equipment are sent in for repair or replacement equipment is received. There shall be no charge for use of these controllers while the City's equipment is in for repair, or the replacement equipment arrives.

In addition, it shall be the responsibility of the Contractor to stock the necessary controllers, poles, and other materials, parts and supplies to restore an intersection to an operating condition on an emergency basis. For purposes of this section, an operating condition shall mean that all signal phases are working and displayed in a manner in accordance with the (CAMUTCD) California Manual on Uniform Traffic Control Devices, but that all features such as actuation or phase-skipping capabilities are not necessarily restored at the time of the emergency repair, unless approved by the City.

The Contractor shall at a minimum have at least one complete spare signal cabinet at all times for replacement in the event of a knockdown.

No permanent or temporary change of controller mechanisms shall be done without prior approval of the City except in case of an emergency. In the event a change is necessary to respond to an emergency, the Contractor shall notify the City by telephone and by email immediately that the equipment was removed and replaced with approved spare equipment. All costs associated with repairing equipment, including diagnostic costs, shall be approved prior to proceeding with repairs.

E. Equipment, Materials and Parts Required to be Used
Contractor shall only use materials, parts and units supplied and/or recommended by the manufacturers of the malfunctioning traffic signal equipment. Where no specific material, part, or item is recommended by the manufacturer or where the material, part, or unit cannot be located locally, the material, part or unit used shall be as prescribed per Section 86 of Caltrans Standard Specifications.

The Contractor shall replace or repair any and all defective parts of the controller mechanism as the occasion arises. Controller units, auxiliary equipment and appurtenances such as load switches, Emergency Vehicle Pre-Emption (EVP) devices, detectors, video detection and monitoring cameras, battery backup system equipment, transformers, relays, Ethernet devices, and related items shall be serviced and overhauled as recommended by the manufacturer.

Redlands Regular Meeting 06-07-2022 1562 of 1593
F. Additions and Deletions to the System
The Contractor shall maintain additional traffic signals and appurtenant devices as they are installed or become part of the maintenance requirements immediately upon written notification by the City. Such additional signals shall be maintained at the same unit price as stipulated in the Contract Agreement. In the event that maintenance of a new signal commences at other than the beginning of the monthly period, the unit rate for routine preventative maintenance services shall be prorated from the date maintenance commences.

The City may, at its sole discretion, eliminate signals from this contract. The Contractor shall be notified of such deletions in writing. Such deleted signals shall decrease the invoice at the same unit price as specified in the Contract Agreement. In the event that maintenance of a signal ceases at other than the beginning of the monthly period, the unit rate for routine preventative maintenance services shall be prorated from the date the Contractor was notified.

G. Request for Service Outside of Normal Hours
The Contractor shall expect service requests outside of the Contractor's normal working hours.

These service requests may be given by telephone, fax, e-mail, written correspondence or other means for reporting related problems, damages, and emergencies listed in the Scope of Work.

The Contractor shall maintain a local or toll-free telephone number where service can be reached twenty-four (24) hours per day, seven (7) days per week, and three hundred and sixty-five (365) days per year, in order to effectively address and respond to both routine and emergency service requests. The telephone number is to be made available to the City-or his representative, and the city of Redlands Police Department. All requests shall be addressed by an appropriate timely response as outlined in this Scope of Work. For the purpose of this contract, "normal hours" shall be defined as Monday through Friday between 7:00 a.m. to 5:00 p.m. (excluding holidays formally recognized by the City).

H. Response Criteria for Routine Services and Emergency Routine requests shall be responded to during normal hour within twenty-four (24) hours of first notification or the first Monday unless a holiday falls on it, after a weekend unless the City agrees upon other arrangements.

The Contractor will need to ascertain whether service requests are of an "emergency" nature requiring an immediate response or whether the request is general in nature requiring routine response. The City may also deem a traffic signal malfunction an emergency condition at its sole discretion. Requests deemed to be "emergencies" shall be responded to immediately with all possible haste, arriving at the signal location within one hour (1 hour) of first notification.

When responding to an emergency or a called in request or an emailed request, the contractor shall note on their paper work the name of the person, date and time of the request.

In general, the following events shall establish an emergency condition:
• Totally blacked out traffic signals. For the intersections in which they are totally blacked out the city will use the following California vehicle code section 21800 until such time repairs or corrections are made to the affected intersections.

Redlands Regular Meeting 06-07-2022 1563 of 1593
• Failure or malfunction of the traffic signal system or interruption of normal signal operations so as to create a public hazard. This may be caused by damage from vehicle collisions or accidents, acts of nature, civil disorder, malicious mischief, vandalism, or actions of other contractors or utility companies.
• Indications in conflict or signal heads are out for any one traffic movement bulbs including bulbs and lenses but not power outage
• Signal/pedestrian heads end or alignments that that give conflicting indications rendered not invisible to any intersection approach.
• Signal cabinet and or signal pole knocked down.
• A red light is reported burned out.
• Any primary head indication is out.
• Any appurtenant traffic signal equipment such as traffic signal heads, street name signs or other regulatory signs, warning or guide signs affixed to mast arms or poles, reported to be knocked down, dangling, or otherwise creating a public hazard shall be immediately repaired or removed as an emergency situation in order to eliminate the hazard or unsafe condition.
• As part of the Contractor's emergency call response, the Contractor may be required to respond to accident scenes at signalized intersections to perform a review of the traffic signal system operation and equipment. The Contractor shall, in this case, thoroughly examine and inspect all equipment at the location for any physical damage or equipment malfunction, including a timing check of the controller. Upon completion of this examination the Contractor shall submit, in writing a report summarizing the results of the examination and inspection to the Department Director or his designee. These results shall also be placed in the maintenance records of the intersection maintained by the Contractor.
• Any other repair that is deemed an emergency by the City.

Under these conditions, the Contractor shall immediately restore the traffic signal to normal operations. If that is not possible due to the extent of damage, sufficient repairs shall be made to enable the intersection to operate safely.

For emergency repair purposes, the Contractor's vehicle shall have immediately available the following equipment: portable stop signs to be installed if required, barricades, cones, replacement signal heads, pedestrian heads, I-A signal pole, load switches, controller, and other related equipment and tools which may be required to repair said damage.

For the emergency repair of a signal, the following procedure for traffic control shall apply:

1. The Contractor shall dispatch qualified personnel and equipment to reach the site within the time frame specified in this Scope of Work for emergency call-out. The Contractor shall carry in their vehicle(s) an adequate supply of stop signs, barricades, traffic cones, etc., which shall be used when controlling traffic during an emergency and/or when necessary by the signal Department Director or their alternate deemed.

2. If no police officer is present and temporary stop signs have been set up when the Contractor arrives at the site, the Contractor shall place the intersection in flash in the signal cabinet before setting up more traffic warning and control devices, if deemed necessary, and Redlands Regular Meeting 06-07-2022 1564 of 1593
proceed to repair the signal. After the signal is back in operation, the Contractor shall remove all of the temporary stop signs and other traffic control devices and return those devices owned by the City to the City Yard.

3. If a police officer is still at the site when the Contractor arrives, the Contractor shall quickly examine the signal, evaluate the situation, discuss it with the police officer, and obtain a Traffic Accident Report Number (if applicable) to be submitted with the invoice for work performed at the signal. If the repair will take longer than the officer can wait and has determined it to be a hazard the Contractor shall immediately place the intersection in flash, set up signs and all other necessary warning devices to protect the motoring public. The Contractor shall also notify the representative, of the any delay and the approximate time of the Contractor's response to such an emergency. Any delay times will not be charged to the City. Contractor shall contact the city prior to responding to the call so it may be tracked.

4. Notification - The Contractor shall notify the City or his authorized representative of any planned alterations, substitutions, or removal of any controller or component, or alteration to the operation of any signal system during normal business hours and give notice to the City same business day of the scheduled work. Notification of changes made at times other than normal business hours, notification to the City shall be reported by telephone or email within two (2) hour of the next business day.

The Contractor shall then call and also confirm via e-mail the morning of each day that any planned extraordinary maintenance that is directed to take place during that day. The Contractor shall notify the department director, or his authorized representative, of the proposed maintenance specifying the type of maintenance, location, and the approximate time of the day.

If work is commenced without obtaining approval from the City, payment will not be made until City staff can inspect the work.

For emergency call-outs during normal business hours of the City, notification by telephone shall be made within one (1) hour of such response. Notifications at times other than normal business hours of the City shall be reported by telephone within two (2) hour of the beginning of the next business day of the City. The Contractor shall thoroughly examine and inspect all equipment at the location for any physical damage or equipment malfunction. Within five (5) calendar days after completion of this examination, the Contractor shall submit, in writing, a report summarizing the results of the examination and inspection to the City or his designated representative. These results shall also be placed in the maintenance records of the intersection maintained by the Contractor.

I. Maintenance Records
The Contractor shall keep a current, permanent operational record of all work performed at the intersection, including, but not limited to, routine maintenance, emergency and nonemergency service calls, and extraordinary maintenance, of each and every piece of traffic control or safety equipment that the Contractor is required to maintain by this contract. The Contractor shall also track the replacement schedule of signal indications and batteries as per the contract documents.

These records shall be kept at each maintained location on a form approved by the City. A copy of such records shall be provided to the Director or his authorized representative within two (2) working days upon request. The form shall include, at a minimum, the location, the date, time, description of the call, PM service or malfunction device narrative of deficiencies encountered, and a detail of any and all corrective actions(s) taken. Entries shall be made legibly in indelible ink and shall be initialed by the technician's employee # when making the entry. The Contractor shall maintain an electronic database of the maintenance records that is remotely accessible by the Director or designee .The database shall be specific for each Agency and searchable by Redlands Regular Meeting 06-07-2022 1565 of 1593
intersection. A written cabinet log shall be kept in each cabinet that includes date and time of repairs, who performed the work, and a brief description of the work that was done. In addition, a checklist of items in Section U-1 below for each tri-monthly routine PM check shall be kept in each signal cabinet. The maintenance records shall be provided to the City on a monthly basis as part of the monthly invoice from the Contractor.

J. Monthly Maintenance Reports
The City of-REDLANDS has approximately 72 traffic signals that are to be divided into three approximately equal lists, and the traffic signals on each list are to be visited once every three months. The Contractor shall develop a monthly summary report in cooperation with the City to be submitted with the monthly invoice for those signals subject to review that month. This monthly summary report shall itemize all activities relating to traffic signal and safety lighting maintenance for each maintained location. The summary report shall list the maintenance history of the entire reporting period for each individual signal location and any deficiencies found including travel, arrival and departure times, dates and location of the repairs, vehicle and service personnel dispatched, types of repairs made, police report # if responded to, requested call(s) and all materials and equipment used for each day worked. A chronological report of all maintenance activities throughout the month is not sufficient. The summary reports shall be submitted to the City within ten (10) days following the end of the month of the reporting period. Invoices will not be paid until the summary report has been reviewed. Reports shall be submitted electronically (in addition to a hard copy). The format is to be an MS Windows Excel spreadsheet.

The following information shall be legible and at a minimum, is required for each signal location:
• Location by intersection and identification of a specific corner or direction of traffic when applicable
• Date and time the call was received and the first and last name of the caller or self-initiated • Date and time the Contractor's personnel and equipment arrived at the scene • Travel time when applicable
• Date and time the job was completed
• Nature of the malfunction, if any, and a description of the action taken by the Contractor • Notation of routine, extraordinary, or additional work (including emergency work) • Accident report number (from RPD) for all accident related work. • Replacement of equipment including the model, part number and serial number All records are the property of the City of Redlands and at the termination of this contract shall be delivered to the City.

K. Salvaged or Damaged Equipment and Ownership
Ownership of all materials existing and incorporated in the work is vested in the name of the City of Redlands. Salvaged or damaged equipment shall become the property of the Contractor unless otherwise directed by the City. Contractor is responsible for the proper disposal and recycling of such material.

Redlands Regular Meeting 06-07-2022 1566 of 1593
Failure to provide adequate safety devices, as directed by the Director or designee, will cause the City to install safety devices as needed and the cost will be assessed to the Contractor at the City's actual cost. The City shall be entitled to offset any costs incurred against the Contractor's invoice.

All costs for traffic control shall be included in the various items of work, and no additional compensation will be allowed.

L. Damage
Adjacent improvements such as street pavement, curbs, sidewalks, sprinklers, landscaping, hardscaping, driveways, and gutters damaged as a result of the Contractor's operation shall be repaired to the satisfaction of Director or designee at the Contractor's expense.

M. Sound and Noise Control
The Contractor shall comply with all local sound control and noise level rules, regulations, and City ordinances, which apply to any work performed pursuant to the contract.

N. Types of Signals / Equipment
The Fee Schedule for both the routine and extraordinary maintenance shall apply to all types of signal controllers, accessories and systems as may exist in the City now or that may be installed during the life of the contract.

O. Meetings
Meetings may be required for the purpose of discussing contract provisions, problems and/or issues and ensuring that the work is proceeding as per the contract documents. The Contractor will be notified in advance and required to attend and participate in these meetings with City staff as needed. These meetings will be called by the Director or his authorized representative. Full compensation for attending these meetings shall be considered as included in the various items of work and no additional compensation shall be allowed therefore.

P. Estimate of Quantities
The quantities shown in the Contract Agreement shall be considered as approximate only. The City does not guarantee or agree, either expressly or by implication that the actual amounts required would correspond therewith, and reserves the right to increase or decrease the amount of any item or portion of work or material to be performed or furnished, or to omit any such item or portion, in accordance with the provisions relative thereto set forth in this "Scope of Work." Q. Routine Preventative Maintenance Program
The Contractor shall provide a program of routine preventative maintenance designed to eliminate or reduce the incidents of malfunction and extend the useful life of the equipment.

1. Routine Preventative Maintenance of Traffic Signals and Safety Lighting Systems
Inspect and service each signalized intersection once every three months. The Contractor shall provide all material, parts, labor, equipment and transportation, including a service bucket truck Redlands Regular Meeting 06-07-2022 1567 of 1593
capable of performing all the required maintenance functions for each assigned technician, to perform this COMPLETE list of services, on a tri-monthly basis.

The bi-monthly traffic signal maintenance bid item will be quantified by "EACH" under the "Units of Measure" in the Fee Schedule for an annual total of 288 maintenance checks at 72 traffic signal locations (72 traffic signals X 4 maintenance checks/year = 288 maintenance checks). The traffic signal maintenance unit price will be for all work specified within the Contract documents and will include all labor, materials, tools, equipment, transportation and incidentals necessary to complete all the items of work. The traffic signal maintenance unit price will be per the Fee Schedule and no additional compensation whether for overtime, shift differentials, or travel time shall be allowed.

The items of work for routine preventative maintenance of traffic signals are as follows:

Air Filter — Replace the air filter element in all controller cabinets so equipped at least once each six (6) months and note in the tri-monthly report any filter replacement. Wash or replace all air filter elements in all cabinets so equipped within three (3) months after the execution of this contract, and so note in the tri-monthly report the date the filter elements are cleaned or replaced.

Battery Backup Systems (BBS) — Backup unit and batteries shall be tested bi-monthly in accordance with the manufacturers recommended maintenance as a part of preventative routine maintenance program. Battery backup systems or batteries shall be replaced at the unit price stated in the Fee Schedule including checking operational voltage range of all batteries, and adjust or repair as needed. The repair or replacement o of any of the BBS components, excluding batteries, shall be considered extra work and will require prior approval by City before work is commenced. Batteries shall be scheduled to be replaced every five (5) years at which time, the new install will reset the clock. If battery failure has occurred prior to the replacement date, approval must be given by the City or his authorized representative BBS Cabinet Exterior — Remove any posters, signs, adhesive labels, and/or graffiti, etc. from the cabinet exterior. Check the interior and exterior of the service cabinets for signs of deterioration to the cabinet's surface using a wire brush and then protect the area with zinc chromate, red lead or rust inhibitor prior to painting with a matching color (only applicable to painted cabinets.) For Stainless or Aluminum cabinets, a circular pattern will be required to mast any graffiti that is gouged or engraved on it.

BBS Cabinet Interior, Fan and Vents — The Contractor shall clean the BBS cabinets thoroughly on the inside, verify that the controller cabinet fan operates properly with a minimum of noise, and check the vents in the service cabinet to ensure that they are free of any foreign material. If a fan is thermostatically controlled the temperature shall be set at 100 degrees.

Before Leaving Intersection — Before leaving the intersection during any routine or extraordinary maintenance, verify that all detector test switches are in "normal" position, and that the stop time switch is in the "auto" or "normal" position. Do a walk of the intersection and touch each corner. Record all information when complete with (name, time, date, nature of work, etc.) in the cabinet logbook. Immediately correct all safety deficiencies found during routine inspections and schedule non-emergency work with City staff.

Cabinet Exterior — Remove any posters, signs, adhesive labels, and/or graffiti, etc. from the controller and service cabinet exteriors.

Redlands Regular Meeting 06-07-2022 1568 of 1593
Cabinet Interior, Fan and Vents — The Contractor shall clean the traffic signal cabinets thoroughly on the inside, including all components. Verify that the controller cabinet fan operates properly with a minimum of noise, and check the vents in both the controller cabinet door and above the door, or at the top of the cabinet to ensure that they are free of any foreign material. If a fan is thermostatically controlled the temperature shall be set at 100 degrees.

Conflict Monitor/MaIfunction Management Unit — Verify that the time clock and date are correct in any Conflict Monitor Unit (CMU)/Malfunction Management Unit (MMU) in all signal cabinets. A visual check is required with each PM to ensure no errors are displayed. Yearly testing, during the months of January and February, of all CMU/MMU equipment shall be completed with the use of an automated testing device with the test results printed on a report that is to be delivered to the City within thirty (30) days from the first location tested. The printed report containing the test results shall, at a minimum, include the following information: report header with type of monitor tested and date tested; agency identification including manufacturer, model and serial number; related test information including operator, test site, and intersection location; and monitor verification with a description of type of tests performed and conditions found (i.e., failure or non-failure). Note in bi-monthly routine maintenance log. The respective monthly invoice for payment of Routine Maintenance will not be processed until CMU/MMU testing is completed and the City has received all required reports.

Connectors — Check all connectors (includes any connections on the main panel, interface panels and under detector racks) to ensure they are secure and free of corrosion. Apply diazo grease as needed to deter corrosion. Note in%-monthly routine maintenance log. Be sure not to damage by over-tightening.

Controller Cabinet Mounting — Check the snugness of the nuts on the controller cabinet anchor bolts, and tightens if necessary, being sure not to distort by overtightening.

Controller Cabinet Foundation Seal — Check the seal between the bottom of the cabinet and the foundation for deterioration. If standing water or evidence of water is present inside the bottom of the controller cabinet, reseal by removing cabinet mounting nuts and installing sealant between cabinet and foundation.

Controller Operation — Manually place vehicle and pedestrian calls on each phase through the controller cabinet test switches or the controller keyboard to verify controller servicing of each active phase. Maintain an accurate chronograph and set all real-time clocks to the National Bureau of Standards (WWV) time. When and where necessary, adjust clocks to Daylight Savings Time within twenty-four (24) hours of time changes. Note: Any time corrections +or - on the log sheet
Detection Setup - Verify that the detector loop cables are correctly identified, connected to the correct vehicle detector field interface terminals, and that the correct detector indicates a call.

Verify that a call is placed on the correct controller detector input, and that the input places a call on the correct controller phase.

Detector Operation — Check detector units and systems including, but not limited to, inductive loops, and pedestrian push buttons for correct detection of both vehicles and pedestrians by observing the turn-on of the appropriate detection indicator as a vehicle passes over or through the detector loop(s)/zone; and adjust or repair said equipment as necessary to restore system to its intended operation.

Redlands Regular Meeting 06-07-2022 1569 of 1593
Door Gasket — Check all door gaskets on the controller cabinet, service cabinet and any other enclosures for evidence of moisture or deterioration. Completely replace any gaskets showing signs of leaking or deterioration.

Door Panel Harness — Check the harness leading from the door panel to the auxiliary panels on the cabinet door to ensure they are not being pinched and do not bind against the cabinet door. Adjust if necessary.

Equipment Displays and Indicators — Verify that all LED and LCD displays and indications (controller, MMU/CMU, load switches, flasher, Radio, pre-emption video diction equipment, etc.) are working properly.

Flash - Verify the operation of the flashers once per year. Verify with a stopwatch that the flash rate is between 50 to 60 pulses per minute and that the "ON/OFF" states for each flash circuit are equal.

Ground Fault Receptacle — Verify the proper operation of "Test" and "Reset" buttons on GFCI type outlets.

Hinges and Locks — Check for free movement of all doors, latching assemblies and locks on the controller cabinet, service cabinet and any other enclosures. Use a minimum of oil or spray lubricant and remove any excess.

Indications — The Contractor shall clean all vehicular and pedestrian module faces once per year, and shall replace burned out vehicular and/or pedestrian modules. Contractor shall furnish all LED signal modules as noted in the program costs per the Fee Schedule agreed to for the maintenance Items as detailed herein below.

In case the Contractor is unable to replenish his supply of City furnished LED modules in time to replace the burned out ones, the Contractor shall replace burned out LED modules with City approved LED modules only. The City will only pay for the cost of installation as per the Fee Schedule, and replace the number of LED modules installed by the Contractor out of City inventory.

The Scope of Work also contains a separate Item for the Group Replacement of non LED Vehicular Indications.

Insect or other Rodent Infestation — Check for any signs of ants, wasps, spiders or other rodents within all the cabinets pull boxes hand holes etc. Take the necessary steps for extermination.

Interior Light — Verify the proper operation of the controller cabinet's interior fluorescent/ LED light and starter. Intersection Records — ensure that all intersection "Record Drawings," cabinet wiring diagrams, necessary equipment operations manuals, controller data timing sheets, and log book are corrected and stay inside the cabinet. Contact designee to obtain any missing items.

Intersection Timing — The City will provide timing sheets in each controller cabinet. These timings are to be maintained by the Contractor. The Contractor is to compare controller phase timing against the approved timing plan, check any discrepancies against intersection log and notify designee of any and all discrepancies. Check the timing of the yellow (caution) intervals on all phases by the controller.

Redlands Regular Meeting 06-07-2022 1570 of 1593
Although, the City will generally complete new timing patterns, the Contractor may be issued a work order from the City authorizing* e Contractor to make necessary changes. The Contractor shall make no timing changes on controllers or accessories unless authorized by the director or designee, EXCEPT during emergencies. In the event that the controller timing does not match the timing sheets in the cabinet, the Contractor shall notify the City for direction on how to proceed.

Timing changes that may be necessary during emergencies (such as loop failures, pushbutton failures, etc.) may be made without prior approval. However, the Department designee must be notified of changes by 8:00 A.M. the next working day. Any change made to the signal timing, permanent or temporary, shall be noted on the timing sheet with date and the initial of the technician, and logged in the repair record in the controller cabinet.

Intersection Walk-Around — Walk all the approaches of the intersection and visually inspect all signal poles, mast arms, signal heads and indications, traffic control signs, pedestrian signals, Cameras, Opticom (preemption) heads, reflective street name signs, loop sealants, pull box covers, and any other devices, and verify the correct placement and/or operation. Any inoperable vehicle or pedestrian indications, safety lights, or illuminated sign lamps shall be replaced under extraordinary maintenance; illuminated signs damaged beyond repair shall be reported to the designee and replaced under extraordinary maintenance with reflective street name signs. All vehicle heads and pedestrian heads found to be out of alignment shall be properly aligned.

Missing signs shall be replaced under extraordinary maintenance. Cracked or damaged loop sealants shall be re-sealed. All other equipment found missing or damaged shall be reported to the City prior to replaced or repaired.

Loop Detectors — The Contractor shall verify the condition of the loops in the roadway and take necessary preventative measures to ensure the longevity of the loop. This includes the splicing (or re-splicing) of detector loops and/or replacement of loop sealant. Cutting and installing new loops is considered extra work and will require prior approval by the City before work is commenced. The failure of a loop due to sealant not maintained is not considered extra work and will be repaired at the Contractor's expense.

Maintenance Log — The Maintenance Log form shall be initialed for every item that was completed during the preventative maintenance that month.

Pedestrian Push Button Assembly — The Contractor shall check all pedestrian push buttons and assembly for proper operation. If necessary, the Contractor shall repair or replace the pedestrian push button and/or assembly as needed. All replaced pedestrian push button assemblies shall be ADA compliant. The replacement of defective parts will be extraordinary maintenance.

Pedestrian Signals — The Contractor shall maintain all pedestrian signal heads in working order, and the cost incurred shall be included in the unit price for routine preventative maintenance per intersection. The replacement of defective parts will be extraordinary maintenance. Pedestrian signal indications requiring replacement shall be replaced with count-down type LED modules as directed by the City.

Plug-in Components — Check that each plug-in component (rack mount detectors, BIU's, relays, load switches, etc.) fits tightly and securely in its socket.

Preemption Devices — Test all preemption devices for proper operation.

Safety Lighting, and Reflective Street Name Signs — The Contractor shall perform a night inspection of all safety lighting, bridge deck lighting and Reflective street name signs at signalized Redlands Regular Meeting 06-07-2022 1571 of 1593
intersections twice per year. The Contractor shall carry photocells, fuses, and splice kits when troubleshooting safety lights. All malfunctioning light fixtures shall be repaired within twenty-four (24) hours of being identified. If repairs cannot be performed at the time of inspection and replacement is necessary, approval from the Director or his authorized representative. Unless otherwise directed by director, all safety lighting/luminaries that cannot be satisfactorily repaired shall be replaced by an LED lighting fixture approved by the City or his authorized representative.

The Contractor shall provide the City in the monthly report showing the number of light fixtures that have been repaired, the type of light fixture, and the location for each light fixture. The City has the right to inspect the Contractor's records to verify any material used in light fixture repair.

Costs incurred in night inspections for Reflective street name and safety lighting shall be included in the unit price for routine preventative maintenance. The replacement of defective parts will be extraordinary maintenance as per the Fee Schedule or per written quote, as directed by the Director or his authorized representative.

Service Connections — Verify that the neutral, ground and power connections are secure in both service cabinets and controller cabinet. Check breakers, lighting contactors, switches terminal connections and photo cells at least once every six (6) months. Note in bi-monthly routine maintenance log. The replacement of defective parts will be extraordinary maintenance as per the Fee Schedule or per written quote, as directed by the Director or his authorized representative.

Signs — Traffic control signs shall be cleaned and adjusted as routine maintenance. The Contractor shall repair or replace any damaged, faded or missing reflectorized street name signs, traffic control signs or pedestrian push button plates affixed to any signal mast arm or pole under extraordinary maintenance, including all bracketing attached to the mast arm to the sign.

Switches — Verify the correct operation of each position, including "OFF", of all switches.

Repeatedly work all test and stop time switches to keep the switch contacts clean.

Terminal Connections — Using the correct size insulated screwdriver, test each terminal screw backing off slightly check for corrosion then retightening to confirm that it is secure (but not to distort or over-tighten) at least once every six (6) months. Note in bi-monthly routine maintenance log and report corrosion in monthly the report.

Thermostat — Verify that the cabinet fan thermostat is set at one hundred (100) degrees Fahrenheit.

Traffic Signal Controller Assembly — The Contractor shall replace, repair, or otherwise render in good working order any and all defective traffic signal controller assemblies with like make and model assemblies as necessary to ensure the safe operation of said signal equipment. Solid-state equipment shall be maintained according to the manufacturer's specifications.

Traffic Signal Poles and Mast Arms — Verify that all nuts and bolts are securely attached at base of poles (including all attachments of signs) and at any connection point. Verify that all hand hole and cover plates are in place to protect wiring.

Vacuum Cabinet — The uses of compressed air is only allowed for terminal blocks, electrical components and vent openings. Thoroughly vacuum the interior of the controller cabinet including all shelves, base of cabinet and the police access panel. Also blow out or vacuum the vent openings above the controller cabinet door.

Video Detection Cameras and Video Processor (Where Present) — The Contractor shall verify that video detection camera lenses are clean and the video processor system is operable.

Redlands Regular Meeting 06-07-2022 1572 of 1593
The Contractor shall clean and polish all video detection camera lenses once every six (6) months, or as directed by Director on an individual basis. At that time, all signal heads, mast arm mounted street name signs, and optically programmed signal heads, shall be realigned as necessary. Note in Tri-monthly routine maintenance log.

2. Routine Preventative Maintenance of a Solar Lighted Crosswalk System The Contractor shall inspect and service a Solar Lighted Crosswalk and provide the labor, equipment and material to perform this COMPLETE list of services twice per year. The schedule shall be established to coincide with the beginning and ending of Daylight Savings Time. Within thirty (30) days of the award, the Contractor shall provide the City with a maintenance schedule.

The bi-annual Solar Lighted Crosswalk maintenance bid item will be quantified by "EACH" under the "Units of Measure" in the Fee Schedule for an annual total of 2 maintenance checks at one Solar Lighted Crosswalk location (1 crosswalk X 2 maintenance checks/year = 2 maintenance checks). The traffic signal maintenance unit price will be for all work specified within the Contract documents and will include all labor, materials, tools, equipment, transportation and incidentals necessary to complete all the items of work.

The items of work for routine preventative maintenance of traffic signals are as follows:

Battery Systems — The Battery System including controller unit and batteries shall be tested in accordance with the manufacturers recommended maintenance as a part of preventative routine maintenance. Check battery voltage and record in cabinet. Failed or defective batteries shall be replaced within five (5) days of diagnosis. Batteries shall be included on a five year replacement program. The repair or replacement of any of the components, including batteries, shall be considered extra work and will require prior approval by the City before work is commenced.

Cabinet - The Contractor shall clean the service cabinets thoroughly on the inside, including all components and any foreign materials; verify that the controller cabinet fan operates properly with a minimum of noise; check the vents in the service cabinet to ensure that they are free of any foreign material; and remove any posters, signs, adhesive labels, and/or graffiti, etc. from the controller and service cabinet exteriors.

Lighted Crosswalk, Flash pattern, flashing lights on poles and roadway lights (pucks) - Compare timing against the approved timing plan, check any discrepancies against log and notify City of all discrepancies. When and where necessary, adjust controller. Verify the flash rate is as per the manufacturer's specifications. The repair or replacement of any of the components, including the roadway lights, shall be considered extra work and will require prior approval by the City before work is commenced Pedestrian Push Button Assembly - The Contractor shall check all pedestrian push buttons for proper operation. If necessary, the Contractor shall repair or replace the pedestrian push button.

Service Connections - Verify that the connections to solar panel to solar controller, ground and power connections are secure in the controller and service cabinet.

Signs - Traffic control signs shall be cleaned and adjusted as routine maintenance. The Contractor shall repair or replace any damaged or missing traffic control signs or pedestrian push button plates affixed to any signal mast arm or pole under extraordinary maintenance, including orange flags on certain mast arms.

Solar Controller - Compare timing against the approved timing plan, check any discrepancies against log and notify Director of all discrepancies. When and where necessary.

Redlands Regular Meeting 06-07-2022 1573 of 1593
Solar Panel - Clean the solar panel (in a manner supported by the manufacturer's specifications) to remove all dust and clean without any damage to the panel. The repair or replacement of any of the components, including the solar panel, shall be considered extra work and will require prior approval by the City before work is commenced.

Visual Inspection - Visually inspect each in-pavement or above-ground flashing device to ensure that they all remain secure in place and are not loose within the pavement. Inspect the devices to ensure that they are not damaged or broken in any manner and that they remain clean. Verify that the device properly activates from the ped push button. Also confirm that the in-pavement light or device is flashing as intended for each direction with similar brightness. Check alignment and clean debris away from the pole mounted lights and "pucks" to insure visibility of 125 yards in each direction. Any device found to be defective shall be scheduled for repair within thirty (30) days of diagnosis and shall be considered extra work and will require prior approval by the City before work is commenced.

R. Group Replacement Program of Non LED Vehicular Signal Indications The Contractor shall develop a schedule to group replace of all non LED vehicular indications in the City by spreading the task out throughout the life of the agreement. The agreement provides for one (1) initial year with up to four (4) extensions of one (1) year. As such, the agreement may span a total of five (5) years. The developed schedule should therefore anticipate group replacements in approximately five equal amounts. That is, about twenty percent (20) of all of the indications replaced per year. This task shall end if the agreement is not renewed or otherwise terminated.

The task shall include all labor and replacement LED indications as per the City's standards and as approved by the City or his authorized representative. The replacement schedule shall be developed around the concept of replacing all indications per intersection at one time. This task may not be accelerated ahead of schedule, with the exception of indications that are replaced ahead of schedule due to burn-out/failure on a case-by-case basis. When indications are replaced ahead of the replacement schedule, they will be removed from the replacement list and the actual date of installation recorded in the maintenance log. Subsequent failure of replaced indications shall be repaired / replaced by the Contractor as warranty work at the Contractor's expense.

The Contractor may choose to replace the one year allotment of twenty percent of LED indications at once, or may spread the work throughout the current contract year, but in any case, shall only be paid for actual work completed as per the Fee Schedule and no additional compensation shall be allowed therefore.

S. Extraordinary Maintenance
Extraordinary maintenance as listed in the Contract Agreement includes all the labor, equipment, parts and materials necessary to ensure the safe and efficient operation of the City's traffic signal system that goes beyond the normal routine preventative maintenance program established by this Scope of Work. Items of extraordinary maintenance or extra work generally include the following:
• Furnish and install replacement traffic signal cabinet assembly including new foundation and all wiring.
• Furnish and install replacement service cabinet, foundation and wiring. • Furnish and install replacement traffic signal poles and mast arms.

Redlands Regular Meeting 06-07-2022 1574 of 1593
• Furnish and install replacement vehicle and pedestrian signal indications. • Furnish and install replacement conduits, pull boxes, lids and wiring. • Furnish and install replacement panels or Reflectorized street name signs (RSNS) as directed by the City.
• Furnish and install replacement safety lights.
• Furnish and install replacement traffic signal control equipment and components. • Furnish and install replacement batteries.
• Paint Signal Equipment
• Cut and install replacement detector loops.

Extraordinary maintenance, except for emergency repairs as provided for in this Scope of Work, shall require prior written authorization from the City. In situations requiring immediate response, verbal authorization from the City or his authorized representative is sufficient followed by a written authorization.

The City will compensate the Contractor for such additional work based on the verified invoice cost of materials, equipment and labor. Billing for such additional work shall reflect the labor rates established by the Fee Schedule. Upon receipt of an itemized invoice within thirty (30) days of completion of work, the City shall compensate the Contractor for additional work.

In the event a price cannot be agreed upon for very specific work not covered by the Fee Schedule, the City reserves the right to repair and/or solicit quotations or invite bids and award work to any Contractor to perform such additional work.

T. Price Markup
The City will allow a maximum of 15% markup for materials only required to complete Extraordinary Maintenance as provided for in this Scope of Work.

U. Permits, Licenses, and Inspections
The Contractor and all its subcontractors shall obtain and pay for a City business license from the City of Redlands prior to the commencement of work, and obtain a no-fee Right-of Way Encroachment Permit and Traffic Control Permit from the City.

The Contractor shall have a Class A and/or California "C-10" Contractor's license at the time of awarding of the contract.

All work performed, or equipment or parts supplied by the Contractor, shall be subject to inspections and approval of the City, or his authorized representative.

Redlands Regular Meeting 06-07-2022 1575 of 1593
EXHIBIT "B"

LABOR AND MATERIAL BOND
Whereas, the City of Redlands, State of California, and (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to Description of Improvement Services to Public Buildings and/or grounds (the “Work”), which said agreement, dated , 20XX, and titled as “Agreement to Perform Non-Professional Services for Improvement to Public Builds and Grounds” is hereby referred to and made a part hereof; and
Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of Written dollar amount Dollars ($ ) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 20__.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:
_______________________________________
________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone( ) ___________________________
Redlands Regular Meeting 06-07-2022 1576 of 1593
EXHIBIT “C”

PRICE AND FEE BID
Redlands Regular Meeting 06-07-2022 1577 of 1593
Redlands Regular Meeting 06-07-2022 1578 of 1593
Redlands Regular Meeting 06-07-2022 1579 of 1593
EXHIBIT “D”
WORKERS’ COMPENSATION INSURANCE CERTIFICATION
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
(a) By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations, a certificate of consent to self-insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

YUNEX, LLC
By: _____ Date: _______ __________
Michael Hutchens, Operations Manager
Redlands Regular Meeting 06-07-2022 1580 of 1593
Sole Source/ Single Source/ Standardization Form
For procurement of supplies, equipment and services valued at $5,000 and over NOTE: Every question must be answered with appropriate documentation attached; incomplete forms will be immediately rejected by Purchasing.

Date:_______________________
TO: Purchasing Division
FROM: ________________________________
Purchase Requisition # ___________________
Estimated Total Cost: $_________________
Proposed Vendor: ______________________
Request Term: _________________
This form must accompany the purchase document whenever an exception to the competitive process is requested. Requests for goods and/or services from a specific vendor or limited to a specific brand, where substitutes to the recommended vendor or brand are unacceptable, must be accompanied by a written justification explaining the circumstances that make alternatives unacceptable.

The City Manager will determine whether the justification is appropriate. Requests for exception must be supported by factual statements that will pass an audit.

Redlands Regular Meeting 06-07-2022 1581 of 1593

INSTRUCTIONS

1. Please check all applicable categories (a. through i.) below and provide additional information where indicated.
a. The requested product is an integral repair part or accessory compatible with existing equipment.

Existing Equipment:

Manufacturer/Model Number:

Age:

Current Estimated Value:
b. The requested product has unique design/performance specifications or quality requirements that are not available in comparable products. c. I have standardized the requested product and the use of another brand/model would require considerable time and funding to evaluate.
d. The requested product is one in which I (and/or my staff) have specialized training and/or extensive expertise. Retraining would incur substantial cost in time and/or funding.
e. The requested product is used or demonstration equipment available at a lower-than-new cost. f. Repair/Maintenance service is available only from manufacturer or designated service representative.
g. Upgrade to or enhancement of existing software is available only from manufacturer. h. Service proposed by vendor is unique; therefore, competitive bids are not available or applicable.
i. Other factors (provide detailed explanation in #2 below).

2. Provide a detailed explanation and pertinent documentation for each category checked in item 1 above. Attach additional sheets if necessary:

Redlands Regular Meeting 06-07-2022 1582 of 1593

3. Was an evaluation of other equipment, products, or services performed? Yes No
If yes, please explain the type of evaluation performed and provide all supporting documentation:

4. List below the name of each individual who was involved in the evaluation, if conducted, and in making the recommendation to procure this product or service. Attach additional information, if necessary.

5. Explain what action(s) the department would take if the sole/single source services were no longer available

6. I certify that the above information is accurate to the best of my knowledge, and a signed copy of this document will be kept on file and available for audit in my department _________________________________________________________ Prepared by Date
_________________________________________________________ Department Director Date
Purchasing Approvals
______________________________________________________
Purchasing Agent Approval Date
_______________________________________________________ City Manager Approval Date
Redlands Regular Meeting 06-07-2022 1583 of 1593
City Council/Successor Agency Meeting N. 3.

DATE: 06/07/2022
TO: The Successor Agency Board of Directors
SUBJECT: Approve minutes of the regular meeting of May 3, 2022 (Secretary Donaldson)
MOTION:

I move to approve the minutes of the regular meeting of May 3, 2022.

Attachments
Minutes of the regular meeting of May 3, 2022
Redlands Regular Meeting 06-07-2022 1584 of 1593

MINUTES
Regular meetings of the City Council and the Board of Directors of the Successor Agency of the former Redevelopment Agency of the City of Redlands held in the Council Chambers, Civic Center, 35 Cajon Street, on May 3, 2022 at 5:00 P.M.

Present:  Paul Barich, Mayor
Eddie Tejeda, Mayor Pro Tempore
Denise Davis, Council Member
Jenna Guzman-Lowery, Council Member
Mick Gallagher, Council Member
Staff: Charles M. Duggan, Jr., City Manager; Dan McHugh, City Attorney; Robert Dawes, City Treasurer; Jeanne Donaldson, City Clerk; Janice McConnell, Assistant City Manager; Chris Boatman, Assistant City Manager; Carl Baker, Public Information Officer; Chris Catren, Police Chief; Danielle Garcia, Management Services/Finance Director; Brian Desatnik, Development Services Director; John Harris, Municipal Utilities and Engineering Director; Rich Sessler, Fire Chief

Mayor Barich called the meeting to order and explained that comments could be presented in-person, via Zoom, via cell phone or landline. He announced there were no Closed Session items to consider.

CLOSED SESSION
No closed session matters.

RECONVENE CITY COUNCIL MEETING
The meeting reconvened at 6:00 P.M. with an invocation by Council Member Davis followed by the pledge of allegiance to the American flag.

PRESENTATIONS
SCE WISE Program
Municipal Utilities and Engineering Director Harris introduced Christian Torres, Key Accounts Advisor with Southern California Edison, who provided background of the WISE Program and presented an energy efficiency incentive check, in the amount of $290,007.70 to Mayor Barich. The City was recognized for the significant energy savings achieved through the upgrades performed at the Wastewater Treatment Plant, and specifically upgrades of the Membrane Bio-Reactor process.

Proclamation Asian American and Pacific Islander Heritage Month CC_SA_May 3, 2022

Page 1 ends
← All documents from this meeting