Cities Index.
Agenda packet

Redlands City Council
March 4, 2025

Document
Agenda packet
Meeting
March 4, 2025
Body
Redlands City Council
Pages
7
Original file
154.8 MB
Text extracted from the city's file for reading and search. Open the original on s3.us-west-004.backblazeb2.com. That file is the official record.

Signature of Authorized Representative: Title of Authorized Representative Printed Name of Authorized Representative Date Signed:

Redlands Regular Meeting of 03-04-2025 796 of 1100
20 NOTICE OF NON-COMPLIANCE
Project:

Contractor:

Notice of Non-Compliance was issued to Contractor’s representative, , Name on at .

The following unsafe behaviors were observed at the Contractor’s job site:

If the unsafe condition is not immediately corrected, the City of Redlands may take disciplinary action in accordance with the Contractor Safety Program guidelines. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ To be completed by Contractor
Corrective action plan to abate hazards:

Unsafe Condition Resolved: Date: Time:

Remarks:

Attachment C
Redlands Regular Meeting of 03-04-2025 797 of 1100
21 Job Hazard Analysis
Signatures of Employees On-Site this JHA is applicable to:

Project:

Company: Project Safety Official: Project Manager (City):

Scope of Work: Location: Date:

Tasks Potential Safety
Risks/Hazards
Safety
Controls/Mitigat
Required PPE
Hard Hat
Safety Vest
Safety Glasses/Goggles
Safety Boots
Respirator
Safety Gloves
Face Shield
Fall Protection
Other:

Employee Signature: Print Name: Date:

Attachment D
Redlands Regular Meeting of 03-04-2025 798 of 1100
22 INCIDENT INVESTIGATION FORM
Date of Incident: Time of Incident: Date Reported:

Lead Investigator: Contact Information:

Contractor: Employee Name:

Witness 1 Name: Telephone:

Witness 2 Name: Telephone:

Incident Site/ Location
Incident Summary:

Near Miss Yes No Incident Severity: Minor Significant Major Critical Root Cause(s):

Corrective Actions:

Attachment E
Redlands Regular Meeting of 03-04-2025 799 of 1100
Redlands Regular Meeting of 03-04-2025 800 of 1100
Redlands Regular Meeting of 03-04-2025 801 of 1100
…
…
.

YES NO
.
…
…
…
.

YES NO
YES NO
Application for Road / Encroachment Permit
City of Redlands - Municipal Utilities & Engineering Department Name: Phone:

Address: City: Zip:

Contractor: USA ID No.:

Contractor License No.: Type: Cal OSHA No.:

I hereby request permission to construct/install improvements/facilities within the City of Redlands road right-of-way at the following location:

Construction Start Date: Anticipated Completion Date:

Development No.: Plan No.:

Street Name:

Cross Streets:

Address:
and for the purpose of performing the following work:

Applicant/Agent Signature: Date:

In accordance with Plans approved by the Municipal Utilities & Engineering Director and/or the Standard Specifications and Detail Drawings of the City of Redlands for the quantity and type of improvements listed below:

SHADED AREA FOR OFFICIAL USE ONLY
EA Driveway Appr, Res/Comm……………… $ 49.00 / EA =$ Truck Route Permit Required:

SF Sidewalk…………………………………… $ 0.09 / SF =$ YES NO
SF Cross Gutter/Spandrel…………………… $ 0.58 / SF =$
LF Curb & Gutter…………………………… $ 2.19 / LF =$ Closure Permit With LF Curb/Berm………………………………… $ 2.62 / LF =$ Traffic Plan Required:

SF Asphalt Pavement…………………………$ 0.04 / SF =$
SF Crushed Aggregate Base……………… $ 0.04 / SF =$
EA Street Light…………………………………$ 81.00 / EA =$ Water Shutdown Required:

EA Traffic Signal - New………………………. $ 2,152.00 / EA =$
EA Traffic Signal - Modification………………$ 1,737.00 / EA =$ CY Reinforced Concrete…………………… $ 89.00 / CY =$ Bond Required:

LF Storm Drain Pipe…………………………. $ 8.00 / LF =$
EA Curb Inlet/Outlet Structures………………$ 67.00 / EA =$
EA Storm Drain Manhole/Junction Box…….. $ 67.00 / EA =$ EA Curb Core…………………………………. $ 62.00 / EA =$
LF Sewer Main……………………..………… $ 0.95 / LF =$
EA Sewer Manhole…………………..………. $ 67.00 / EA =$ Conduit Material:

EA Sewer Cleanout……………………………$ 134.00 / EA =$
EA Sewer Lateral…………………………… $ 67.00 / EA =$
LF Water Main - Potable…………………….. $ 1.09 / LF =$ Conduit Size:

LF Water Main - Non-Potable……...……….. $ 1.09 / LF =$
EA Fire Hydrant Assembly……………………$ 66.00 / EA =$
EA Water Service Lateral……………………. $ 26.00 / EA =$
EA Water Shutdown………………………….. $ 67.00 / EA =$
EA Fire Service……………………………… $ 58.00 / EA =$
LF Excavation/Utility Trench………..….…….$ 1.25 / LF =$
SF Street Patch……………………………….. $ 0.67 / SF =$
SF Warranty Fee (Street Cut)……………..…$ / SF =$
$ / =$ Calculated By
$ / =$
SUBTOTAL PERMIT FEE $
PERMIT FEE work complete within specified date from issuance = Inspected by $ 219.00 fee. $219.00
Municipal Utilities & Engineering
PENALTY FEE 25% of total permit fee if issued after commencement of work $ ($250.00 minimum fee)
(Effective 06/02/09) TOTAL ENCROACHMENT PERMIT FEE $ Approved By Redlands Regular Meeting of 03-04-2025 802 of 1100

ENCROACHMENT PERMIT RIDER
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
DOT TR-0122 (REV 05/2023) Collected By
08-24-N-UJ-0098
Permit No.

Rider Fee Paid
$ 0.00 08/SBD/10/PM 28.32
Dist/Co/Rte/PM
November 14, 2024
Date
08-24-N-RW-1033
Rider Number
TO: CITY OF REDLANDS
Attn: Goutam Dobey
35 Cajon St Suite 15A
REDLANDS, CA 92373
(909)798-7584
, PERMITTEE
In compliance with your request of August 20, 2024
DATE
we are hereby amending the above numbered
encroachment permit as follows
Enter onto Route 10 right-of-way at California St. in the City of Redlands, to modify work previously approved under Permit#08-24-NUJ-0098 by using open-trench method for recycled water pipeline installation instead of using bore and jack method (trenchless) within the State right-of-way, as per attached plans date stamped November 13, 2024, by the Caltrans District 8 Encroachment Permit Office and/or to the satisfaction of the Caltrans Representative.

All traffic control work/plans should be in compliance with Caltrans 2023 Standard Plan and 2014 California MUTCD and/or to the satisfaction of the Caltrans Representative.

Note: Contractor need to submit traffic control plan, Authorization form TR-0429, copy of bond with the City, certificate of liability insurance, and excavation shoring plan prior to any construction activity A pre-job meeting with the assigned Caltrans Representative, Ray Behbahani, (951) 314-3548, is required at least 7 days prior to start of any work under this permit. Failure to do so may result in permit revocation with no prejudice.

Except as amended, all other terms and provisions of the original permit shall remain in effect.

FM 91 1437
CC:
#1: George Mikaeil
#2: Ray Behbahani
#3: CARLOS NOVELO
#4: RUBEN O CRUZ
Catalino A. Pining III, District Director

APPROVED
BY
{{ KAREN L ADAME, District Permit Engineer Sig1_es_:signer1:signature }} ADA Notice This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284, TTY 711, in writing at Forms Management Unit, 1120 N Street, MS-89, Sacramento, CA 95814, or by email at [email protected].

Redlands Regular Meeting of 03-04-2025 803 of 1100

ENCROACHMENT PERMIT RIDER
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
DOT TR-0122 (REV 05/2023) Collected By
08-24-N-UJ-0098
Permit No.

Rider Fee Paid
$ 0.00 08/SBD/10/PM 28.32
Dist/Co/Rte/PM
July 17, 2024
Date
08-24-N-RT-0871
Rider Number
TO: CITY OF REDLANDS
35 Cajon St Suite 15A
REDLANDS, CA 92373
, PERMITTEE
In compliance with your request of July 17, 2024
DATE
we are hereby amending the above numbered
encroachment permit as follows
Date of completion extended to: August 05, 2025
Except as amended, all other terms and provisions of the original permit shall remain in effect.

FM 91 1437
CC:
#1: George Mikaeil
#2: Ray Behbahani
#3: CARLOS NOVELO
#4:

Catalino A. Pining III, District Director

APPROVED
BY
{{ JIAQIAN LI, District Permit Engineer Sig1_es_:signer1:signature }} ADA Notice This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284, TTY 711, in writing at Forms Management Unit, 1120 N Street, MS-89, Sacramento, CA 95814, or by email at [email protected].

Redlands Regular Meeting of 03-04-2025 804 of 1100
Redlands Regular Meeting of 03-04-2025 805 of 1100
Redlands Regular Meeting of 03-04-2025 806 of 1100
Redlands Regular Meeting of 03-04-2025 807 of 1100
Redlands Regular Meeting of 03-04-2025 808 of 1100
Redlands Regular Meeting of 03-04-2025 809 of 1100
Redlands Regular Meeting of 03-04-2025 810 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 1 of 6 ends

© 2018 California Department of Transportation. All rights reserved.

ENCROACHMENT PERMIT GENERAL PROVISIONS
TR-0045 (REV. 12/2022)

1. AUTHORITY: The California Department of
Transportation (“Department”) has authority to issue
encroachment permits under Division 1, Chapter 3,
Article 1, Sections 660 through 734 of the Streets and
Highways Code.

2. REVOCATION: Encroachment permits are revocable on
five (5) business days’ notice unless otherwise stated on the permit or otherwise provided by law, and except as
provided by law for public corporations, franchise holders, and utilities. Notwithstanding the foregoing, in an
emergency situation as determined by the Department,
an encroachment permit may be revoked immediately.

These General Provisions and any applicable Special
Provisions are subject to modification or abrogation by the Department at any time. Permittees’ joint use
agreements, franchise rights, reserved rights or any other agreements for operating purposes in State of California (“State”) highway right-of-way may be exceptions to this revocation.

3. DENIAL FOR NONPAYMENT OF FEES: Failure to pay
encroachment permit fees when due may result in
rejection of future applications, denial of encroachment permits, and revocation of the encroachment permit if
already issued.

4. PERMITTEE AUTHORIZATION FOR OTHERS TO
PERFORM WORK: This encroachment permit allows
only the Permittee and/or Permittee’s authorized
contractor or agent to work within or encroach upon the State highway right-of-way, and the Permittee may not
assign or transfer this encroachment permit. Any attempt to assign or transfer this encroachment permit shall be null and void. Permittee shall provide to the Department a list of Permittee’s authorized contractors/agents, in the form and at the time specified by the Department but if no time is specified then no later than the pre-construction meeting. Permittee shall keep the list current and shall provide updates to the Department immediately upon any
change to the list of authorized contractors/agents,
including but not limited the addition, removal, or
substitution of an authorized contractor/agent, or a new address or contact information for an existing authorized contractor/agent. Permittee is responsible for the acts and/or omissions of any person or entity acting on behalf of the Permittee, even if such person or entity is not
included on Permittee’s list of authorized contractors
and/or agents.

5. ACCEPTANCE OF PROVISIONS: Permittee, and the
Permittee’s authorized contractors and/or agents,
understand and agree to accept and comply with these
General Provisions, the Special Provisions, any and all terms and/or conditions contained in or incorporated into the encroachment permit, and all attachments to the
encroachment permit (collectively “the Permit
Conditions”), for any encroachment, work, and/or activity to be performed under this encroachment permit and/or
under color of authority of this encroachment permit.

Permittee understands and agrees the Permit Conditions
are applicable to and enforceable against Permittee as
long as the encroachment remains in, under, or over any part of the State highway right-of-way. The Permittee’s authorized contractors and/or agents, are also bound by the Permit Conditions. Non-compliance with the Permit
Conditions by the Permittee’s authorized contractor
and/or agent will be deemed non-compliance by the
Permittee.

6. BEGINNING OF WORK: When traffic is not impacted
(see General Provision Number 35), the Permittee must
notify the Department’s representative two (2) business days before starting permitted work. Permittee must notify the Department’s representative if the work is to be
interrupted for a period of five (5) business days or more, unless otherwise agreed upon. All work must be
performed on weekdays during regular work hours,
excluding holidays, unless otherwise specified in this
encroachment permit.

7. STANDARDS OF CONSTRUCTION: All work performed
within State highway right-of-way must conform to all
applicable Departmental construction standards including but not limited to: Standard Specifications, Standard
Plans, Project Development Procedures Manual,
Highway Design Manual and Special Provisions.

Other than as expressly provided by these General
Provisions, the Special Provisions, the Standard
Specifications, Standard Plans, and other applicable
Departmental standards, nothing in these General
Provisions is intended to give any third party any legal or equitable right, remedy, or claim with respect to the
encroachment permit and/or to these General Provisions
or any provision herein. These General Provisions are for the sole and exclusive benefit of the Permittee and the Department.

Where reference is made in such standards to
“Contractor” and “Engineer,” these are amended to be
read as “Permittee” and “Department’s representative,”
respectively, for purposes of this encroachment permit.

8. PLAN CHANGES: Deviations from plans, specifications, and/or the Permit Conditions as defined in General
Provision Number 5 are not allowed without prior approval from the Department’s representative and the Federal
Highway Administration (“FHWA”) representative if
applicable.

9. RIGHT OF ENTRY, INSPECTION AND APPROVAL: All
work is subject to monitoring and inspection. The United States, the State, the Department, and the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, and other state, and
federal agencies, and the FHWA, through their agents or representatives, must have full access to highway
Redlands Regular Meeting of 03-04-2025 811 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 2 of 6 ends

© 2018 California Department of Transportation. All rights reserved. facilities/encroachment area, at any and all times for the purpose of inspection, maintenance, activities needed for construction/reconstruction, and operation of the State highway right-of-way.

Upon completion of work, Permittee must request a
final inspection for acceptance and approval by the
Department. The local public agency Permittee must not
give final construction approval to its contractor until final acceptance and approval by the Department is obtained.

10. PERMIT AT WORKSITE: Permittee and Permittee’s
authorized contractors/agents must keep the permit
package and current list of authorized contractors/agents, or copies thereof, at the work site at all times and must show such documents upon request to any Department
representative or law enforcement officer. If the permit package or current list of authorized contractors/agents, or copies thereof, are not kept and made available at the work site at all times, then all work must be suspended.

11. CONFLICTING ENCROACHMENTS: Permittee must
yield start of work to ongoing, prior authorized work
adjacent to or within the limits of the Permittee’s project site. When existing encroachments conflict with
Permittee’s work, the Permittee must bear all cost for
rearrangements (e.g., relocation, alteration, removal,
etc.).

12. PERMITS, APPROVALS, AND CONCURRENCES
FROM OTHER AGENCIES AND/OR ENTITIES: This
encroachment permit is invalidated if the Permittee has not obtained all permits, approvals, and concurrences
necessary and required by law, including but not limited to those from the California Public Utilities Commission (“CPUC”), California Occupational Safety and Health
Administration (“Cal-OSHA”), local and state and federal environmental agencies, the California Coastal
Commission, and any other public agency and/or entity
having jurisdiction. Permittee is responsible for providing notice of the encroachment to, and obtaining concurrence from, any person or entity (whether public or private)
affected by the scope of work described in the
encroachment permit, regardless of whether such notice
or concurrence is required by law; the Department is not responsible to provide such notice or obtain such
concurrence. Permittee warrants all such permits,
approvals, and concurrences have been obtained before
beginning work under this encroachment permit. The
Department may, at the Department’s discretion, require the Permittee to demonstrate that Permittee has obtained all such permits, approvals, and concurrences, and
Permittee shall demonstrate this at the time and in the manner specified by the Department.

13. PEDESTRIAN AND BICYCLIST SAFETY: A safe
continuous passageway must be maintained through the
work area at existing pedestrian or bicycle facilities. At no time must pedestrians be diverted onto a portion of the street used for vehicular traffic. At locations where safe alternate passageways cannot be provided, appropriate
signs and barricades must be installed at the limits of construction and in advance of the limits of construction at the nearest crosswalk or intersection to detour
pedestrians to facilities across the street. Attention is directed to Section 7-1.04 “Public Safety,” and to Section 12-4.04 “Temporary Pedestrian Access Routes,” and to
Section 16-2.02 “Temporary Pedestrian Facility,” of the Department’s Standard Specifications, and to California Vehicle Code section 21760, subdivision (c).

14. PUBLIC TRAFFIC CONTROL: The Permittee must
provide traffic control protection, warning signs, lights, safety devices, etc., and take all other measures
necessary for the traveling public’s safety as required by law and/or the Department. While providing traffic control, the needs of all road users, including but not limited to motorists, bicyclists and pedestrians, including persons with disabilities in accordance with the Americans with Disabilities Act, must be an essential part of the work activity.

Lane, Bike Lane, Sidewalk, Crosswalk, and/or
shoulder closures must comply with the Department’s
Standard Specifications and Standard Plans for
Temporary Traffic Control Systems & Temporary
Pedestrian Access Routes, and with the applicable
Special Provisions. Where issues are not addressed in
the Standard Specifications, Standard Plans, and/or
Special Provisions, the California Manual on Uniform
Traffic Control Devices (Part 6, Temporary Traffic Control) must be followed.

15. MINIMUM INTERFERENCE WITH TRAFFIC: Permittee
must plan and conduct work so as to create the least
possible inconvenience to the traveling public (motorized vehicles, unmotorized vehicles such as bicycles,
pedestrians, person(s) with disabilities, etc.), such that traffic is not unreasonably delayed.

16. STORAGE OF EQUIPMENT AND MATERIALS: The
storage of equipment or materials is not allowed within State highway right-of-way, unless specified within the Special Provisions of this encroachment permit. If
encroachment permit Special Provisions allow for the
storage of equipment or materials within the State
highway right-of-way, the equipment and material storage must also comply with Section 7-1.04, Public Safety, of the Department’s Standard Specifications.

17. CARE OF DRAINAGE: Permittee must provide alternate
drainage for any work interfering with an existing drainage facility in compliance with the Department’s Standard
Specifications, Standard Plans, and/or as directed by the Department’s representative.

18. RESTORATION AND REPAIRS IN STATE HIGHWAY
RIGHT-OF-WAY: Permittee is responsible for restoration
and repair of State highway right-of-way resulting from permitted work (Streets and Highways Code, section 670
et seq.).

19. STATE HIGHWAY RIGHT-OF-WAY CLEAN UP: Upon
completion of work, Permittee must remove and dispose
of all scraps, refuse, brush, timber, materials, etc. off the State highway right-of-way. The aesthetics of the highway must be as it was before work started or better.

20. COST OF WORK: Unless stated otherwise in the
encroachment permit or a separate written agreement
with the Department, the Permittee must bear all costs
Redlands Regular Meeting of 03-04-2025 812 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 3 of 6 ends

© 2018 California Department of Transportation. All rights reserved. incurred for work within the State highway right-of-way and waives all claims for indemnification or contribution from the United States, the State, the Department, and
from the Directors, officers, and employees of the State and/or the Department. Removal of Permittee’s personal
property and improvements shall be at no cost to the
United States, the State, and the Department.

21. ACTUAL COST BILLING: When specified in the permit,
the Department will bill the Permittee actual costs at the currently set Standard Hourly Rate for encroachment
permits.

22. AS-BUILT PLANS: When required, Permittee must
submit one (1) set of folded as-built plans within thirty (30) calendar days after completion and acceptance of work in compliance with requirements listed as follows:
a) Upon completion of the work provided herein, the
Permittee must submit a paper set of As-Built plans
to the Department’s representative.
b) All changes in the work will be shown on the plans, as issued with the permit, including changes approved
by Encroachment Permit Rider.
c) The plans are to be prominently stamped or otherwise noted “AS-BUILT” by the Permittee’s representative
who was responsible for overseeing the work. Any
original plan that was approved with a Department
stamp, or by signature of the Department’s
representative, must be used for producing the AsBuilt plans. d) If construction plans include signing or striping, the dates of signing or striping removal, relocation, or
installation must be shown on the As-Built plans when
required as a condition of the encroachment permit.

When the construction plans show signing and
striping for staged construction on separate sheets,
the sheet for each stage must show the removal,
relocation, and installation dates of the appropriate
staged striping and signing.
e) As-Built plans must contain the Encroachment Permit
Number, County, Route, and Post Mile on each
sheet.
f) The As-Built Plans must not include a disclaimer
statement of any kind that differs from the obligations and protections provided by sections 6735 through
6735.6 of the California Business and Professions
Code. Such statements constitute non-compliance
with Encroachment Permit requirements and may
result in the Department retaining Performance
Bonds or deposits until proper plans are submitted.

Failure to comply may also result in denial of future
encroachment permits or a provision requiring a
public agency to supply additional bonding.

23. PERMITS FOR RECORD PURPOSES ONLY: When
work in the State highway right-of-way is within an area under a Joint Use Agreement (JUA) or a Consent to
Common Use Agreement (CCUA), a fee exempt
encroachment permit is issued to the Permittee for the
purpose of providing a notice and record of work. The
Permittee’s prior rights must be preserved without the
intention of creating new or different rights or obligations. “Notice and Record Purposes Only” must be stamped
across the face of the encroachment permit.

24. BONDING: The Permittee must file bond(s), in advance, in the amount(s) set by the Department and using forms
acceptable to the Department. The bonds must name the
Department as obligee. Failure to maintain bond(s) in full force and effect will result in the Department stopping all work under this encroachment permit and possibly
revoking other encroachment permit(s). Bonds are not
required of public corporations or privately-owned utilities unless Permittee failed to comply with the provisions
and/or conditions of a prior encroachment permit. The
surety company is responsible for any latent defects as provided in California Code of Civil Procedure section
337.15. A local public agency Permittee also must comply with the following requirements:
a) In recognition that project construction work done on State property will not be directly funded and paid by
State, for the purpose of protecting stop notice
claimants and the interests of State relative to
successful project completion, the local public agency
Permittee agrees to require the construction
contractor to furnish both a payment and performance
bond in the local public agency’s name with both
bonds complying with the requirements set forth in
Section 3-1.05 Contract Bonds of the Department’s
Standard Specifications before performing any
project construction work.
b) The local public agency Permittee must defend,
indemnify, and hold harmless the United States, the
State and the Department, and the Directors, officers,
and employees of the State and/or Department, from
all project construction related claims by contractors, subcontractors, and suppliers, and from all stop
notice and/or mechanic’s lien claimants. The local
public agency also agrees to remedy, in a timely
manner and to the Department’s satisfaction, any
latent defects occurring as a result of the project
construction work.

25. FUTURE MOVING OF INSTALLATIONS: Permittee
understands and agrees to relocate a permitted
installation upon notice by the Department. Unless under prior property right or agreement, the Permittee must
comply with said notice at the Permittee’s sole expense.

26. ENVIRONMENTAL:
a) ARCHAEOLOGICAL/HISTORICAL: If any
archaeological or historical resources are identified or encountered in the work vicinity, the Permittee must
immediately stop work, notify the Department’s
representative, retain a qualified archaeologist who
must evaluate the site at Permittee’s sole expense,
and make recommendations to the Department’s
representative regarding the continuance of work.
b) HAZARDOUS MATERIALS: If any hazardous waste
or materials (such as underground storage tanks,
asbestos pipes, contaminated soil, etc.) are identified or encountered in the work vicinity, the Permittee
must immediately stop work, notify the Department’s
representative, retain a qualified hazardous
Redlands Regular Meeting of 03-04-2025 813 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 4 of 6 ends

© 2018 California Department of Transportation. All rights reserved. waste/material specialist who must evaluate the site
at the Permittee’s sole expense, and make
recommendations to the Department’s representative
regarding the continuance of work.

Attention is directed to potential aerially deposited
lead (ADL) presence in unpaved areas along
highways. It is the Permittee’s responsibility to take all appropriate measures to protect workers in
conformance with California Code of Regulations
Title 8, Section 1532.1, “Lead,” and with Cal-OSHA
Construction Safety Orders, and to ensure roadway
soil management is in compliance with Department of
Toxic Substances Control (DTSC) requirements.
c) BIOLOGICAL: If any regional, state, or federally listed biological resource is identified or encountered in the work vicinity, the Permittee must immediately stop
work, notify the Department’s representative, retain a
qualified biologist who must evaluate the site at
Permittee’s sole expense, and make
recommendations to the Department’s representative
regarding the continuance of work.

27. PREVAILING WAGES: Work performed by or under an
encroachment permit may require Permittee’s contractors and subcontractors to pay appropriate prevailing wages
as set by the California Department of Industrial
Relations. Inquiries or requests for interpretations relative to enforcement of prevailing wage requirements must be
directed to the California Department of Industrial
Relations.

28. LIABILITY, DEFENSE, AND INDEMNITY: The Permittee
agrees to indemnify and save harmless the United States, the State, the Department, and the Directors, officers, employees, agents and/or contractors of the State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages, costs, liability, suits, or actions of every name, kind, and description, including but not limited to those brought for or on account of property damage, invasion of privacy, violation or deprivation of a right under a state or federal law, environmental damage or penalty, or injury to or death of any person including but not limited to members of the public, the Permittee, persons employed by the Permittee, and/or persons
acting on behalf of the Permittee, arising out of or in connection with: (a) the issuance and/or use of this
encroachment permit; and/or (b) the encroachment, work, and/or activity conducted pursuant to this encroachment permit, or under color of authority of this encroachment permit but not in full compliance with the Permit
Conditions as defined in General Provision Number 5
(“Unauthorized Work or Activity”); and/or (c) the
installation, placement, design, existence, operation,
and/or maintenance of the encroachment, work, and/or
activity; and/or (d) the failure by the Permittee, or by anyone acting for or on behalf of the Permittee, to perform the Permittee’s obligations under any part of the Permit Conditions as defined in General Provision Number 5, in respect to maintenance or any other obligation; and/or (e) any change to the Department’s property or adjacent
property, including but not limited to the features or
conditions of either of them, made by the Permittee or
anyone acting on behalf of the Permittee; and/or (f) a
defect or obstruction related to or caused by the
encroachment, work, and/or activity whether conducted in compliance with the Permit Conditions as defined in
General Provision Number 5 or constituting Unauthorized Work or Activity, or from any cause whatsoever. The duty of the Permittee to indemnify and save harmless includes the duties to defend as set forth in Section 2778 of the Civil Code.

It is the intent of the Department and the Permittee
that except as prohibited by law, the Permittee will defend, indemnify, and hold harmless as set forth in this General Provision Number 28 regardless of the existence or
degree of fault or negligence, whether active or passive, primary or secondary, on the part of: the United States, the State; the Department; the Directors, officers,
employees, agents and/or contractors of the State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors; the Permittee; persons employed by the Permittee; and/or persons
acting on behalf of the Permittee.

The Permittee waives any and all rights to any type of
expressed or implied indemnity from or against the United States, the State, the Department, and the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors.

The Permittee understands and agrees to comply
with the obligations of Titles II and III of the Americans with Disabilities Act in the conduct of the encroachment, work, and/or activity whether conducted pursuant to this encroachment permit or constituting Unauthorized Work
or Activity, and further agrees to defend, indemnify, and save harmless the United States, the State, the
Department, and the Directors, officers, employees,
agents, and/or contractors of the State and/or of the
Department, including but not limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages, costs, penalties, liability,
suits, or actions of every name, kind, and description
arising out of or by virtue of the Americans with Disabilities Act.

The Permittee understands and agrees the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors, are not personally responsible for any liability arising from or by virtue of this encroachment permit.

For the purpose of this General Provision Number 28
and all paragraphs herein, “contractors of the State and/or of the Department” includes contractors, and their
subcontractors, under contract to the State and/or the
Department.

This General Provision Number 28 and all
paragraphs herein take effect immediately upon issuance of this encroachment permit, and apply before, during,
and after the encroachment, work, and/or activity
Redlands Regular Meeting of 03-04-2025 814 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 5 of 6 ends

© 2018 California Department of Transportation. All rights reserved. contemplated under this encroachment permit, whether
such work is in compliance with the Permit Conditions as defined in General Provision Number 5 or constitutes
Unauthorized Work or Activity, except as otherwise
provided by California law. The Permittee’s obligations to defend, indemnify, and save harmless under this General Provision Number 28 take effect immediately upon
issuance of this encroachment permit and have no
expiration date, including but not limited to situations in which this encroachment permit expires or is revoked, the work or activity performed under this encroachment
permit is accepted or not accepted by the Department, the encroachment, work, and/or activity is conducted in
compliance with the Permit Conditions as defined in
General Provision Number 5 or constitutes Unauthorized
Work or Activity, and/or no work or activity is undertaken by the Permittee or by others on the Permittee’s behalf.

If the United States or an agency, department, or
board of the United States is the Permittee, the first two paragraphs of this General Provision Number 28
(beginning “The Permittee agrees to indemnify…” and “It is the intent of the parties…”) are replaced by the following paragraph:

Claims for personal injury, death, or property damage
allegedly caused by the negligent or wrongful act or
omission of any employee of the United States acting
within the scope of their official duties are subject to the Federal Tort Claims Act, as amended, 28 U.S.C. § 1346
and § 2671 et seq. (Chapter 171).

29. NO PRECEDENT ESTABLISHED: This encroachment
permit is issued with the understanding that it does not establish a precedent.

30. FEDERAL CIVIL RIGHTS REQUIREMENTS FOR
PUBLIC ACCOMMODATION:
a) As part of the consideration for being issued this
encroachment permit, the Permittee, on behalf of
Permittee and on behalf of Permittee’s personal
representatives, successors in interest, and assigns,
does hereby covenant and agree that:
i) No person on the grounds of race, color, or
national origin may be excluded from participation
in, be denied the benefits of, or be otherwise
subjected to discrimination in the use of said
facilities.
ii) That in connection with the construction of any
improvements on said lands and the furnishings
of services thereon, no discrimination must be
practiced in the selection and retention of first-tier
subcontractors in the selection of second-tier
subcontractors.
iii) That such discrimination must not be practiced
against the public in their access to and use of the
facilities and services provided for public
accommodations (such as eating, sleeping, rest,
recreation), and operation on, over, or under the
space of the State highway right-of-way.
iv) That the Permittee must use the premises in
compliance with all other requirements imposed
pursuant to Title 15, Code of Federal
Regulations, Commerce and Foreign Trade,
Subtitle A. Office of the Secretary of Commerce,
Part 8 (15 C.F.R. Part 8) and as said Regulations
may be amended.
b) That in the event of breach of any of the above
nondiscrimination covenants, the State and the
Department have the right to terminate this
encroachment permit and to re-enter and repossess
said land and the facilities thereon and hold the same
as if said permit had never been made or issued.

31. MAINTENANCE: The Permittee is responsible at
Permittee’s sole expense for the encroachment, and the
inspection, maintenance, repair, and condition thereof, and is responsible to ensure the encroachment does not
negatively impact State highway safety, maintenance,
operations, construction, State facilities, activities related to construction/reconstruction, or other encroachments.

The Permittee’s obligations in the preceding sentence
take effect immediately upon issuance of this
encroachment permit and continue until the
encroachment is entirely and permanently removed.

Additional encroachment permits or approval documents
may be required authorizing work related to inspection, repair, and/or maintenance activities. Contact the
Department for information.

32. SPECIAL EVENTS: In accordance with subdivision (a) of Streets and Highways Code section 682.5 and 682.7, the
Department is not responsible for the conduct or
operation of the permitted activity, and the applicant
agrees to defend, indemnify, and hold harmless the
United States, the State, the Department, and the
Directors, officers, employees, agents, and contractors of the State and/or of the Department, including but not
limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages,
costs, liability, suits, or actions of every name, kind and description arising out of any activity for which this
encroachment permit is issued.

The Permittee is required, as a condition of this
encroachment permit, for any event that awards prize
compensation to competitors in gendered categories, for any participant level that receives prize compensation, to ensure the prize compensation for each gendered
category is identical at each participant level. (Streets and Highways Code, section 682.7.)
The Permittee understands and agrees to comply
with the obligations of Titles II and III of the Americans with Disabilities Act in the conduct of the event, and
further agrees to defend, indemnify, and save harmless
the United State, the State and the Department, and the Directors, officers, and employees of the State and/or
Department, including but not limited to the Director of the Department and the Deputy Directors, from any and all
claims, demands, damages, costs, liability, suits, or
actions of every name, kind and description arising out of or by virtue of the Americans with Disabilities Act.

33. PRIVATE USE OF STATE HIGHWAY RIGHT-OF-WAY:

State highway right-of-way must not be used for private purposes without compensation to the State. The gifting Redlands Regular Meeting of 03-04-2025 815 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 6 of 6 ends

© 2018 California Department of Transportation. All rights reserved. of public property uses and therefore public funds is
prohibited under the California Constitution, Article XVI, Section 6.

34. FIELD WORK REIMBURSEMENT: Permittee must
reimburse the Department for field work performed by or on behalf of the Department to correct or remedy issues created by the Permittee or by others acting on behalf of the Permittee, including but not limited to hazards or
damaged facilities, or to clear refuse, debris, etc. not attended to by the Permittee or by others acting on behalf of the Permittee.

35. LANE CLOSURE REQUEST SUBMITTALS AND

NOTIFICATION OF CLOSURES TO THE
DEPARTMENT: Lane closure request submittals and
notifications must be in accordance with Section 12-4.02, and Section 12.4-04, of the Department’s Standard
Specifications or as directed by the Department’s
representative. The Permittee must notify the
Department’s representative and the Traffic Management
Center (“TMC”) before initiating a lane closure or
conducting an activity that may cause a traffic impact. In emergency situations when the corrective work or the
emergency itself may affect traffic, the Department’s
representative and the TMC must be notified as soon as
possible.

36. SUSPENSION OF TRAFFIC CONTROL OPERATION:

The Permittee, upon notification by the Department’s
representative, must immediately suspend all traffic lane, bike lane, sidewalk, crosswalk, and/or shoulder closure operations and any operation that impedes the flow of
traffic. All costs associated with this suspension must be borne by the Permittee.

37. UNDERGROUND SERVICE ALERT (USA)
NOTIFICATION: Any excavation requires compliance
with the provisions of Government Code section 4216 et
seq., including but not limited to notice to a regional notification center, such as Underground Service Alert
(USA). The Permittee must provide notification to the
Department representative at least five (5) business days before, and the regional notification center at least fortyeight (48) hours before, performing any excavation work within the State highway right-of-way.

38. COMPLIANCE WITH THE AMERICANS WITH
DISABILITIES ACT (ADA): All work within the State
highway right-of-way to construct and/or maintain any
public facility must be designed, maintained, and
constructed strictly in accordance with all applicable
Federal Access laws and regulations (including but not
limited to Section 504 of the Rehabilitation Act of 1973, codified at 29 U.S.C. § 794), California Access laws and regulations relating to ADA, along with its implementing regulations, Title 28 of the Code of Federal Regulations Parts 35 and 36 (28 C.F.R., Ch. I, Part 35, § 35.101 et seq., and Part 36, § 36.101 et seq.), Title 36 of the Code of Federal Regulations Part 1191 (36 C.F.R., Ch. XI, Part 1191, § 1119.1 et seq.), Title 49 of the Code of Federal Regulations Part 37 (49 C.F.R., Ch. A, Part 37, § 37.1 et seq.), the United States Department of Justice Title II and Title III for the ADA, and California Government Code
section 4450 et seq., which require public facilities be made accessible to persons with disabilities.

Notwithstanding the requirements of the previous
paragraph, all construction, design, and maintenance of public facilities must also comply with the Department’s Design Information Bulletin 82, “Pedestrian Accessibility Guidelines for Highway Projects” and Standard Plans &
Specifications on “Temporary Pedestrian Access
Routes.”

39. STORMWATER: The Permittee is responsible for full
compliance with the following:
a) For all projects, the Department’s Storm Water
Program and the Department’s National Pollutant
Discharge Elimination System (NPDES) Permit
requirements under Order No. 2012-0011-DWQ,
NPDES No CAS000003; and
b) In addition, for projects disturbing one acre or more of soil, with the California Construction General
Permit Order No. 2009-0009-DWQ, NPDES No
CAS000002; and
c) In addition, for projects disturbing one acre or more of soil in the Lahontan Region with Order No. R6T-2016-
0010, NPDES No CAG616002.
d) For all projects, it is the Permittee’s responsibility to install, inspect, repair, and maintain all facilities and devices used for water pollution control practices
(Best Management Practices/BMPs) before
performing daily work activities.

Redlands Regular Meeting of 03-04-2025 816 of 1100

STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT TRENCH DETAIL
TR - 0153 (Rev. 07/2021) Page 1 of 2

TYPICAL TRENCH DETAILS
Notes: D - Depth of cover as
identified & approved
based on submitted plans.

FG - Finish Grade.

OG - Original Ground.

All work must be authorized by the encroachment permit, and/or as directed by the State's representative. (Notes continue on page 2)
Redlands Regular Meeting of 03-04-2025 817 of 1100

STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT TRENCH DETAIL
TR - 0153 (Rev. 07/2021) Page 2 of 2
Must include tracer wire or other continuous measure to provide positive subsurface detection for the life of the facility (Project Development Procedures Manual (PDPM) Chapter 17).

Open trench installation of underground utility facilities must include warning tape or warning mats complying with the American Public Works Association (APWA) Uniform Color Code for identifying the type of underground utility. Where mechanical protection is installed, warning tape must be placed above the mechanical protection and below the roadbed subgrade as shown on the details. (PDPM Chapter 17).

Clearance between the trench wall and conduit of less than 6 inches in width shall be a minimum of 2 inches.

Clearance between the trench wall and conduit of greater than 6 inches in width shall be a minimum of 6 inches.

When the trench width is less than 24 inches the backfill for subgrade must consist of slurry cement. Controlled Low-Strength Material (CLSM) can be substituted at the discretion of the State’s representative.

When trench width is greater than 24 inches compacted aggregate base may be used for backfilling.

Structure backfill and compaction must conform to Section 19-3.02C and 3.03 of the Standard Specifications.

For trench located under unimproved surface, structure backfill can use the original soil. Soil must be compacted by mechanical means. Ponding, jetting or flooding are not allowed. Slurry cement backfill is not optional unless approved by the Caltrans District.

Slurry cement backfill must conform to Section 19-3.02E of the Standard Specifications.

Aggregate base and its compaction shall conform to Section 26 of the Standard Specifications.

CLSM if used must conform to Section 19-3.02G of the Standard Specifications. When CLSM is utilized the mix design and test results must be submitted to the State's representative. See Appendix H of the Encroachment Permits Manual for additional information.

Cold planed surface and overlay shall be to the nearest lane line for the entire length of the trench/disturbed areas, and/or as directed by the State's representative.

When Hot mix asphalt (HMA) is used to backfill Asphalt Concrete (AC) Section of the road, HMA must conform to Section 39 of the Standard Specifications.

A paving notch (“T” Cut) shall be cold planed in exist asphalt concrete to a minimum width of 12 inches beyond each side of the trench and to a depth of 3 inches for the final layer of HMA.

AC used to replace pavement section shall match existing pavement depth, unless directed otherwise by the State’s representative.

A tack coat of asphaltic emulsion conforming to Section 39-2.01C (3) (f) shall be applied.

When the trench is within 4 feet of curb and gutter, additional cold planning may be required at the discretion of the State's representative. Potholes or trenches separated / adjoined by 10 feet or less to be overlaid together at the discretion of the State's representative.

Pavement markings and/or striping removed or damaged during construction must be replaced in kind as directed by the State's representative.

Other trench related details are shown in Chapter 6 of the Encroachment Permits Manual as well as the Trenching and Shoring Manual. Both publications can be found on the State of California, Department of Transportation’s website.

If trench is located in the roadway where Portland Cement Concrete (PCC) exist, remove the concrete to a depth of at least 3 feet below finished grade as per standard Specification 15-1.03B. Replace entire concrete slab from joint to joint as directed by State's representative.

Electrical systems installations that are part of State Highway System must be installed in compliance with Caltrans Standard Specifications, Section 87.

Redlands Regular Meeting of 03-04-2025 818 of 1100
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Page 1 of 3

ENCROACHMENT PERMIT SPECIAL PROVISIONS

STORMWATER SPECIAL PROVISIONS FOR MINIMAL OR NO

IMPACT (SWSP)
TR-0400 (Rev. 09/2024)

1. GENERAL: The purpose of these Special Provisions
is to provide the Permittee with specifications for
water pollution control to minimize, prevent, or
control the discharge of material into the air, surface waters, groundwater, and storm sewers owned by the
State or local agencies. These provisions are not
intended to take the place of the Caltrans Water
Pollution Control Program (WPCP) for projects where
soil disturbance from work activities ranging from
more than a quarter of an acre to less than one acre,
or work activities of one acre or more subject to the
preparation of the Caltrans Storm Water Pollution
Prevention Plan (SWPPP). These provisions must be
included with the permit for projects that require an
Erosion and Sediment Control Plan (ESCP). The
Permittee must comply with the following Special
Provisions and the direction of the State
Representative. All Stormwater Best Management
Practices (BMPs) must conform to Section 13 Water
Pollution Control of the Caltrans’ Standard
Specifications.

2. NPDES REQUIREMENTS: The Permittee must be
responsible for full compliance with the Caltrans Storm Water Program and the Caltrans National Pollutant
Discharge Elimination System (NPDES) Permit
requirements (Order 2022-0033-DWQ, NPDES No.

CAS000003, and any amendments and/or subsequent
orders). Projects in construction with active waste
discharge identification number (WDID number) may
continue their coverage with the California
Construction General Permit CGP (Order 2009-0009-
DWQ, NPDES No. CAS000002, and any amendments
and/or subsequent orders) until 9/1/2025. Privately
funded projects may not extend their 2009 CGP
regulatory coverage and are responsible for
compliance with the CGP (Order WQ 2022-0057-
DWQ NPDES No. CAS000002) after 9/1/2023. It is the
Permittee’s responsibility to install, inspect, and
repair or maintain facilities and devices used for water pollution control practices (BMPs) before performing
daily work activities. Installation, inspection and
maintenance responsibilities on the job site include:
1) soil stabilization materials in work areas that are
inactive or prior to storm events, 2) water pollution
control devices to control sediment and erosion, 3)
implementation of spill and leak prevention
procedures for chemical and hazardous substances
stored on the job site, 4) material storage, 5) stockpile management, 6) waste management, 7) nonstormwater management, 8) water conservation, 9) tracking controls, and 1 0 ) illicit connection, illegal discharge detection and reporting. The Permittee
must report to the State Representative when
discharges enter receiving waters, adjacent property,
and drainage systems. The Permittee must also
address any illicit discharges or illegal dumping prior to start of daily work schedule by cleaning them up.

Copies of written notices or orders from the Regional
Water Quality Control Board or other regulatory
agency must be provided to the State Representative
within forty-eight (48) hours of reported activity.

For additional information on stormwater compliance,
visit the State Water Resources Control Board’s
Storm Water Program.

3. RESPONSIBILITY FOR DEBRIS REMOVAL: The
Permittee must be responsible for preventing project
related sediment, trash, debris, and other
construction waste from entering the street, storm
drains, drainage swales, stormwater conveyance
infrastructure, local creeks, or any other bodies of
water. All existing treatment BMP’s (TBMPs) must be
protected in place. If an existing TBMP is damaged
by the Permittee, the Permittee is responsible for
complete repair to a satisfactory condition determined
by the State Representative.

4. SPOILS AND RESIDUE: The Permittee must
vacuum any saw-cut concrete waste material, debris,
residue, etc. No spoils, debris, residue, etc. must be
washed into a drainage system. The Permittee must
ensure that Portland cement concrete and asphalt
concrete grindings are not stockpiled or used in a
manner that may result in an unauthorized
stormwater discharge to waters of the state.

5. SWEEPING: Sweep paved roads at construction
entrance and exit locations and surrounding paved
areas daily within the job site during: 1) clearing and grubbing, 2) earthwork, 3) trenching, 4) soil
disturbance, 5) pavement grinding and/or cutting, and
6) after observing tracking of material onto or off the State property. Minimize the amount of dust particles
during sweeping activities, ensuring that the levels
do not exceed the standards set by local air quality
control districts or the EPA's National Ambient Air
Quality standards. Use wet-vacuum whenever dust
generation is excessive, or sediment pickup is
ineffective.

Roadways or work areas must not be washed down
with water. Street sweeping operations must conform
to Section 13 Water Pollution Control of the Caltrans’
Standard Specifications.

6. VEHICLES AND EQUIPMENT: The Permittee
must prevent all vehicles, equipment, etc. from
leakage or mud tracking onto roadways. If leaks
cannot be repaired immediately, remove the vehicle
or equipment from the job site. If vehicle or equipment cannot be immediately removed from job site, install
secondary containment to contain spill and prevent
illicit non-stormwater discharge.

7. MAINTENANCE AND FUELING OF VEHICLES
AND EQUIPMENT: Maintenance and fueling of
equipment must not result in any pollution at the job
site. The Permittee must immediately clean up
spills/leaks, and properly dispose of contaminated soil and materials. All maintenance and fueling should be
conducted at an appropriate facility that is feasible. All maintenance and fueling which must occur onsite
Redlands Regular Meeting of 03-04-2025 819 of 1100
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Page 2 of 3

ENCROACHMENT PERMIT SPECIAL PROVISIONS
shall be conducted as far away as practical from drain
inlets, water bodies, and other stormwater
conveyance systems.

8. CLEANING VEHICLES AND EQUIPMENT: Limit
vehicle and equipment cleaning or washing at the job
site except what is necessary to control vehicle
tracking or hazardous waste. All equipment must be
sanitized prior to mobilization to limit the spread of
invasive plant species. The Permittee must clean all
equipment within a bermed area or over a drip pan
large enough to prevent run-off. Notify the Engineer
before cleaning vehicles and equipment at the job site
with soap, solvents, or steam. Any water from this
operation must be collected and disposed of at an
appropriate site. Containment berms or dikes must be
used for fueling, washing, maintaining and washing
vehicles or equipment in outside areas. Containment
must be performed at least one hundred (100) feet
from concentrated flows of storm water, drainage
courses, and storm drain inlets if within a flood plain, otherwise at least fifty (50) feet if outside the floodplain.

Keep adequate quantities of absorbent spill cleanup
material and spill kits in the fueling or maintenance
area and on fueling trucks.

9. DIESEL FUELS: The use of diesel fuel from
petroleum or other fossil fuel as a form-oil or solvent is not allowed.

10. WEATHER CONDITIONS AT WORKSITE: Any
activity that generates fine particles or dust (e.g., Saw cutting, earthwork, sanding, etc.), which could be
carried off-site by stormwater, must be conducted
during dry weather conditions to avoid immediate
mobilization into the drainage system.

11. WIND EROSION PROTECTION: The use of Wind
Erosion BMPs must be deployed year-round in
instances where dust or fine particles could be
transported off site. Potential wind erosion BMPs may
include wind fence, water application, gravel, and/or
hydro-mulch.

12. HOT MIX ASPHALT: Runoff from washing hot mix
asphalt must not enter any drainage conveyances or
receiving waters.

13. PROTECTION OF DRAINAGE FACILITIES: The
Permittee must protect/cover gutters, ditches,
drainage courses, and inlets with gravel bags, fiber
rolls, State approved fabric filters, etc., to the
satisfaction of the State Representative during grading, paving, sealing, saw-cutting, grooving and grinding, or any other activity which may result in an illicit
discharge. All materials must conform to Section 13-

6.02 Materials for Water Pollution Control of the
Caltrans’ Standard Specifications. No such protection
measures must cause an obstruction to the traveling
public. The Permittee must implement spill and leak
prevention procedures for chemicals and hazardous
substances stored on the job site (including secondary
containment requirements) in accordance with Section
13-4.03B Spill Prevention and Control and for leaks
and spills from vehicles and equipment each day of
use in accordance with Section 13-1.03C Inspections
for Water Pollution Control and Section 14-11
Hazardous Waste and Contamination for
Environmental Stewardship of the Caltrans’ Standard
Specifications.

14. PAINT: Clean water-based and oil-based paint from
brushes or equipment within a contained area to
prevent contamination of soil, receiving waters, or
storm drain systems. Handle and dispose of paints,
thinners, solvents, residues, and sludges that cannot
be recycled or reused as hazardous waste under
section 14-11. When thoroughly dry, dispose of dry
latex paint, paint cans, used brushes, rags, absorbent
materials, and drop cloths as solid waste under
section 14-10.

15. CONSTRUCTION MATERIALS AND MATERIAL
MANAGEMENT: Materials necessary for erosion
and sediment control must be stockpiled on site at
convenient locations to facilitate prompt installation.

Such materials must be implemented at all inactive
disturbed areas, and prior to all qualifying rain
events. A "Qualifying Precipitation Event" (QPE) is
defined as a forecast with a 50% or greater probability of precipitation that results in 0.5 inches or more of rain within a 24-hour period. Do not allow soil, sediment,
or other debris from stockpiles to enter storm drains,
open drainages, or watercourses. Minimize
stockpiles of all construction materials, including, but not limited to; pressure treated wood, asphalt concrete, cold mix asphalt concrete, concrete, grout, cement
containing premixes, and mortar. All stockpiling of such materials must conform to Section 13-4.03C(2)
Material Storage and Section 13-4.03C(3) Stockpile
Management for Water Pollution Control of the
Caltrans’ Standard Specifications.

16. CONCRETE EQUIPMENT: Concrete equipment
must be washed in a designated washing area in a way
that does not contaminate soil, receiving waters, or
storm drain systems. Any concrete washout activities
which result in compromised containment must be
cleaned and disposed of immediately. All Designated
concrete facilities, including equipment, washout
areas must be contained during Qualifying
Precipitation Events (QPEs) marked by clearly visible
signage throughout the project area.

17. EXISTING VEGETATION: Established existing
vegetation is the best form of erosion control. Minimize disturbance to existing vegetation. Fenced barriers
may serve as an adequate buffer to prevent traffic
across existing vegetation. Damaged or removed
vegetation must be replaced as directed by the State
Representative.

18. SOIL DISTURBANCE: Soil disturbing activities must
be avoided during the wet weather season. If
construction activities during wet weather are allowed
in the permit, all necessary erosion control and soil
stabilization measures must be implemented in
advance of soil disturbing activity. All temporary
relocation of BMPs must be completed at the end of
each working day and prior to each Qualifying
Precipitation Event with a 50% or greater probability
of precipitation that results in 0.5 inches or more of
rain within a 24-hour period. Silt and debris shall be
removed from linear barriers as part of the regular
inspection schedule and as deemed necessary by the
State Representative.

Redlands Regular Meeting of 03-04-2025 820 of 1100
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Page 3 of 3

ENCROACHMENT PERMIT SPECIAL PROVISIONS

19. SLOPE STABILIZATION AND TRACKING
CONTROL: Consider a certified expert in Erosion and
Sediment Control in cases where slopes are disturbed
or during implementation of temporary road
construction for equipment and material access to the
project. The Permittee is directed to comply with
Section 13.5 Temporary Soil Stabilization, Section

13.6 Temporary Sediment Control, Section 13.7
Temporary Tracking Control and Section 21 Erosion
Control of the Caltrans’ Standard Specifications for
construction during application of temporary soil
stabilization and sediment/tracking control measures
to minimize impacts to the soil surface. Temporary
construction entrances/exits are required to be
stabilized and may include gravel, rumble plates,
and/or FODS. Erosion control blankets, temporary
mulch, soil binders, tackifier, fiber, seed, straw,
temporary covers, rigid plastic, gravel bag barriers,
sediment filter bags, temporary check dams, drainage
inlet protection, fiber rolls and/or silt fences may be required down slope and on temporary construction
roads and entrances until permanent soil stabilization
is established. Consult with manufacturer
specifications regarding maintenance frequency of
sediment controls. All controls must be maintained to
ensure proper functionality. The Permittee must limit
the use of plastic materials when more sustainable,
environmentally friendly alternatives exist or when
environmental regulations prohibit their use within the project.

20. STOCKPILES: All stockpiled materials must be stored at least one hundred (100) feet from concentrated
flows of storm water, drainage courses, and storm
drain inlets if within a flood plain, otherwise at least fifty (50) feet if outside the floodplain. All stockpiles must be covered and protected with a temporary perimeter
sediment barrier if inactive or prior to each Qualifying Precipitation Event with a 50% or greater probability
of precipitation that results in 0.5 inches or more of
rain within a 24-hour period. A stockpile is considered inactive after fourteen (14) days without addition or
subtraction. Additionally, cold mix stockpiles must be
stored on an impermeable surface and covered with
nine (9) mil plastic to prevent contact with water.

Minimize stockpiling of materials on the job site.

Manage stockpiles by implementing the water pollution
control practices in Section 13--4.03C(3) Stockpile
Management for Water Pollution Control of the
Caltrans’ Standard Specifications for construction.

Demolished material must not be allowed to enter
storm drain systems and receiving waters. Use
authorized covers and platforms to collect debris. Use
attachments on equipment to catch debris during all
demolition activities. Empty debris-catching devices
daily and handle debris in accordance with Section
13-4.03D Waste Management for Water Pollution
Control of the Caltrans’ Standard Specifications for
construction.

21. DISCOVERY OF CONTAMINATION: The State
Representative must be notified in case any unusual
discoloration, odor, or texture of ground water, is found in excavated material. Additionally, the State
Representative must be notified if abandoned,
underground tanks, pipes, or buried debris are
encountered.

22. SANITARY AND SEPTIC WASTE: Do not bury or
discharge wastewater from a sanitary or septic system
within the highway. A sanitary facility discharging into a sanitary sewer system must be properly connected
and free from leaks. Place a portable sanitary facility at least 50 feet away from storm drains, receiving waters, and flow lines. The Permittee must comply with local
health agency regulations if using an on-site disposal
system.

23. LIQUID WASTE: Prevent job site liquid waste from
entering storm drain systems and receiving waters.

Drilling slurries, grease or oil-free wastewater or rinse water, dredging, and wash water or rinse water running
off a surface or other non-storm water liquids not
covered under separate wastewater permits must be
held in structurally sound, leak-proof containers, such as portable bins or portable tanks. Store containers at least fifty (50) feet away from moving vehicles,
equipment, concentrated flows of storm water,
drainage courses, and storm drain inlets. Liquid waste
may require testing to determine hazardous material
content prior to disposal. All measures must conform
to section 13--4.03D(5) Liquid Waste for Water
Pollution Control of the Caltrans’ Standard
Specifications for construction.

24. WATER CONTROL AND CONSERVATION:

Manage water use in a way that will prevent erosion
and discharge of pollutants into storm drain systems
and receiving waters. Direct all runoff into areas where it can infiltrate.

25. PILE DRIVING: Keep spill kits and cleanup materials at pile driving locations. Park pile driving equipment
over drip pans, absorbent pads, or plastic sheeting with absorbent material, and away from stormwater run-on
when not in use. In the event of oil/grease leaks and
spills from pile driving activities, immediately contain and dispose of all contaminated materials.

26. DEWATERING: Dewatering consists of discharging
accumulated storm water, groundwater, or surface
water from excavations or temporary containment
facilities. All dewatering operations must comply with
the latest Caltrans guidelines including the Field Guide for Construction Site Dewatering. Contact the State
Representative for approval of dewatering discharge
by infiltration or evaporation, otherwise, any effluent discharged into a permitted storm water system
requires approval from the Regional Water Quality
Control Board. Prior to the start of dewatering, the
Permittee must provide the State Representative with
a dewatering and discharge work plan that complies
with Section 13-4.03G Dewatering for Water Pollution
Control of the Caltrans’ Standard Specifications for
construction. Work plan also references guidelines and
BMPs in the CGP and the Field Manual for
Construction Site Dewatering. A 24-hour email
notification of dewatering discharge to the Regional
Water Board, including the implemented SWPPP and
BMPs, is required by Attachment J of the CGP.

Redlands Regular Meeting of 03-04-2025 821 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT
DOT TR-0120 (REV 05/2023)
FM 91 1436
08-24-N-UJ-0098
Permit No.

ADA Notice This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284, TTY 711, in writing at Forms Management Unit, 1120 N Street, MS-89, Sacramento, CA 95814, or by email at [email protected].

In compliance with your application of January 25, 2024 Reference Documents:

Utility Notice No.

Agreement No.

R/W Contract No.

Project code (ID):

Applicant's Reference/ Utility Work Order No.
of
of
of
CFC #:

N/A
08/SBD/10/PM 28.32
Dist/Co/Rte/PM
February 15, 2024
Permit Approval Date
$0
Performance Bond Amount (1)
$0
Payment Bond Amount (2)
$ N/A
Bond Company
$ N/A
Bond Number (1)
$ N/A
Bond Number (2)

CITY OF REDLANDS
Attn: Goutam Dobey
35 Cajon St Suite 15A
REDLANDS, CA 92373
(909)798-7584
TO:
, PERMITTEE
Enter onto Route 10 right-of-way at California St. in the City of Redlands, to bore and jack to install recycled water pipeline within the State right-of-way, as per attached plans date stamped February 13, 2024, by the Caltrans District 8 Encroachment Permit Office and/or to the satisfaction of the Caltrans Representative.

All traffic control work/plans should be in compliance with Caltrans 2023 Standard Plan and 2014 California MUTCD and/or to the satisfaction of the Caltrans Representative.

Note: Contractor need to submit traffic control plan, Authorization form TR-0429, copy of bond and certificate of liability insurance prior to any construction activity.

A pre-job meeting with the assigned Caltrans Representative, Ray Behbahani, (909) 383-6348, (951) 314-3548, is required at least 7 days prior to start of any work under this permit. Failure to do so may result in permit revocation with no prejudice. and subject to the following, PERMISSION IS HEREBY GRANTED to:

THIS PERMIT IS NOT A PROPERTY RIGHT AND DOES NOT TRANSFER WITH THE PROPERTY TO A NEW OWNER.

The following attachments are also included as part of this permit (check applicable):

YES NO General Provisions
YES NO Utility Maintenance Provisions
YES NO Storm Water Special Provisions
YES NO Special Provisions
YES NO A Cal-OSHA Permit, if required: Permit No.

YES NO As-Built Plans Submittal Route Slip for Locally Advertised Projects YES NO Storm Water Pollution Protection Plan
In addition to fee, the permittee will be billed actual costs for:

YES NO Review
YES NO Inspection
YES Field Work
(if any Caltrans effort expended)
As-built Plans are Required
YES NO
YES NO The information in the environmental documentation has been reviewed and considered prior to approval of this permit.

This permit is to be strictly construed and no other work other than specifically mentioned is hereby authorized.

No project work shall be commenced until all other necessary permits and environmental clearances have been obtained.

This permit is void unless the work is completed before August 6 , 2024 CC:
#1: George Mikaeil
#2: Ray Behbahani
#3: RUBEN O CRUZ
#4: NOVELO CARLOS
Catalino A. Pining III, District Director
APPROVED:

BY
{{Sig1_es_:signer1:signature }} Andy D Quach, District Permit Engineer Redlands Regular Meeting of 03-04-2025 822 of 1100
Redlands Regular Meeting of 03-04-2025 823 of 1100
Redlands Regular Meeting of 03-04-2025 824 of 1100
Redlands Regular Meeting of 03-04-2025 825 of 1100
Redlands Regular Meeting of 03-04-2025 826 of 1100
Redlands Regular Meeting of 03-04-2025 827 of 1100
Redlands Regular Meeting of 03-04-2025 828 of 1100
Redlands Regular Meeting of 03-04-2025 829 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 1 of 6 ends

© 2018 California Department of Transportation. All rights reserved.

ENCROACHMENT PERMIT GENERAL PROVISIONS
TR-0045 (REV. 12/2022)

1. AUTHORITY: The California Department of
Transportation (“Department”) has authority to issue
encroachment permits under Division 1, Chapter 3,
Article 1, Sections 660 through 734 of the Streets and
Highways Code.

2. REVOCATION: Encroachment permits are revocable on
five (5) business days’ notice unless otherwise stated on the permit or otherwise provided by law, and except as
provided by law for public corporations, franchise holders, and utilities. Notwithstanding the foregoing, in an
emergency situation as determined by the Department,
an encroachment permit may be revoked immediately.

These General Provisions and any applicable Special
Provisions are subject to modification or abrogation by the Department at any time. Permittees’ joint use
agreements, franchise rights, reserved rights or any other agreements for operating purposes in State of California (“State”) highway right-of-way may be exceptions to this revocation.

3. DENIAL FOR NONPAYMENT OF FEES: Failure to pay
encroachment permit fees when due may result in
rejection of future applications, denial of encroachment permits, and revocation of the encroachment permit if
already issued.

4. PERMITTEE AUTHORIZATION FOR OTHERS TO
PERFORM WORK: This encroachment permit allows
only the Permittee and/or Permittee’s authorized
contractor or agent to work within or encroach upon the State highway right-of-way, and the Permittee may not
assign or transfer this encroachment permit. Any attempt to assign or transfer this encroachment permit shall be null and void. Permittee shall provide to the Department a list of Permittee’s authorized contractors/agents, in the form and at the time specified by the Department but if no time is specified then no later than the pre-construction meeting. Permittee shall keep the list current and shall provide updates to the Department immediately upon any
change to the list of authorized contractors/agents,
including but not limited the addition, removal, or
substitution of an authorized contractor/agent, or a new address or contact information for an existing authorized contractor/agent. Permittee is responsible for the acts and/or omissions of any person or entity acting on behalf of the Permittee, even if such person or entity is not
included on Permittee’s list of authorized contractors
and/or agents.

5. ACCEPTANCE OF PROVISIONS: Permittee, and the
Permittee’s authorized contractors and/or agents,
understand and agree to accept and comply with these
General Provisions, the Special Provisions, any and all terms and/or conditions contained in or incorporated into the encroachment permit, and all attachments to the
encroachment permit (collectively “the Permit
Conditions”), for any encroachment, work, and/or activity to be performed under this encroachment permit and/or
under color of authority of this encroachment permit.

Permittee understands and agrees the Permit Conditions
are applicable to and enforceable against Permittee as
long as the encroachment remains in, under, or over any part of the State highway right-of-way. The Permittee’s authorized contractors and/or agents, are also bound by the Permit Conditions. Non-compliance with the Permit
Conditions by the Permittee’s authorized contractor
and/or agent will be deemed non-compliance by the
Permittee.

6. BEGINNING OF WORK: When traffic is not impacted
(see General Provision Number 35), the Permittee must
notify the Department’s representative two (2) business days before starting permitted work. Permittee must notify the Department’s representative if the work is to be
interrupted for a period of five (5) business days or more, unless otherwise agreed upon. All work must be
performed on weekdays during regular work hours,
excluding holidays, unless otherwise specified in this
encroachment permit.

7. STANDARDS OF CONSTRUCTION: All work performed
within State highway right-of-way must conform to all
applicable Departmental construction standards including but not limited to: Standard Specifications, Standard
Plans, Project Development Procedures Manual,
Highway Design Manual and Special Provisions.

Other than as expressly provided by these General
Provisions, the Special Provisions, the Standard
Specifications, Standard Plans, and other applicable
Departmental standards, nothing in these General
Provisions is intended to give any third party any legal or equitable right, remedy, or claim with respect to the
encroachment permit and/or to these General Provisions
or any provision herein. These General Provisions are for the sole and exclusive benefit of the Permittee and the Department.

Where reference is made in such standards to
“Contractor” and “Engineer,” these are amended to be
read as “Permittee” and “Department’s representative,”
respectively, for purposes of this encroachment permit.

8. PLAN CHANGES: Deviations from plans, specifications, and/or the Permit Conditions as defined in General
Provision Number 5 are not allowed without prior approval from the Department’s representative and the Federal
Highway Administration (“FHWA”) representative if
applicable.

9. RIGHT OF ENTRY, INSPECTION AND APPROVAL: All
work is subject to monitoring and inspection. The United States, the State, the Department, and the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, and other state, and
federal agencies, and the FHWA, through their agents or representatives, must have full access to highway
Redlands Regular Meeting of 03-04-2025 830 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 2 of 6 ends

© 2018 California Department of Transportation. All rights reserved. facilities/encroachment area, at any and all times for the purpose of inspection, maintenance, activities needed for construction/reconstruction, and operation of the State highway right-of-way.

Upon completion of work, Permittee must request a
final inspection for acceptance and approval by the
Department. The local public agency Permittee must not
give final construction approval to its contractor until final acceptance and approval by the Department is obtained.

10. PERMIT AT WORKSITE: Permittee and Permittee’s
authorized contractors/agents must keep the permit
package and current list of authorized contractors/agents, or copies thereof, at the work site at all times and must show such documents upon request to any Department
representative or law enforcement officer. If the permit package or current list of authorized contractors/agents, or copies thereof, are not kept and made available at the work site at all times, then all work must be suspended.

11. CONFLICTING ENCROACHMENTS: Permittee must
yield start of work to ongoing, prior authorized work
adjacent to or within the limits of the Permittee’s project site. When existing encroachments conflict with
Permittee’s work, the Permittee must bear all cost for
rearrangements (e.g., relocation, alteration, removal,
etc.).

12. PERMITS, APPROVALS, AND CONCURRENCES
FROM OTHER AGENCIES AND/OR ENTITIES: This
encroachment permit is invalidated if the Permittee has not obtained all permits, approvals, and concurrences
necessary and required by law, including but not limited to those from the California Public Utilities Commission (“CPUC”), California Occupational Safety and Health
Administration (“Cal-OSHA”), local and state and federal environmental agencies, the California Coastal
Commission, and any other public agency and/or entity
having jurisdiction. Permittee is responsible for providing notice of the encroachment to, and obtaining concurrence from, any person or entity (whether public or private)
affected by the scope of work described in the
encroachment permit, regardless of whether such notice
or concurrence is required by law; the Department is not responsible to provide such notice or obtain such
concurrence. Permittee warrants all such permits,
approvals, and concurrences have been obtained before
beginning work under this encroachment permit. The
Department may, at the Department’s discretion, require the Permittee to demonstrate that Permittee has obtained all such permits, approvals, and concurrences, and
Permittee shall demonstrate this at the time and in the manner specified by the Department.

13. PEDESTRIAN AND BICYCLIST SAFETY: A safe
continuous passageway must be maintained through the
work area at existing pedestrian or bicycle facilities. At no time must pedestrians be diverted onto a portion of the street used for vehicular traffic. At locations where safe alternate passageways cannot be provided, appropriate
signs and barricades must be installed at the limits of construction and in advance of the limits of construction at the nearest crosswalk or intersection to detour
pedestrians to facilities across the street. Attention is directed to Section 7-1.04 “Public Safety,” and to Section 12-4.04 “Temporary Pedestrian Access Routes,” and to
Section 16-2.02 “Temporary Pedestrian Facility,” of the Department’s Standard Specifications, and to California Vehicle Code section 21760, subdivision (c).

14. PUBLIC TRAFFIC CONTROL: The Permittee must
provide traffic control protection, warning signs, lights, safety devices, etc., and take all other measures
necessary for the traveling public’s safety as required by law and/or the Department. While providing traffic control, the needs of all road users, including but not limited to motorists, bicyclists and pedestrians, including persons with disabilities in accordance with the Americans with Disabilities Act, must be an essential part of the work activity.

Lane, Bike Lane, Sidewalk, Crosswalk, and/or
shoulder closures must comply with the Department’s
Standard Specifications and Standard Plans for
Temporary Traffic Control Systems & Temporary
Pedestrian Access Routes, and with the applicable
Special Provisions. Where issues are not addressed in
the Standard Specifications, Standard Plans, and/or
Special Provisions, the California Manual on Uniform
Traffic Control Devices (Part 6, Temporary Traffic Control) must be followed.

15. MINIMUM INTERFERENCE WITH TRAFFIC: Permittee
must plan and conduct work so as to create the least
possible inconvenience to the traveling public (motorized vehicles, unmotorized vehicles such as bicycles,
pedestrians, person(s) with disabilities, etc.), such that traffic is not unreasonably delayed.

16. STORAGE OF EQUIPMENT AND MATERIALS: The
storage of equipment or materials is not allowed within State highway right-of-way, unless specified within the Special Provisions of this encroachment permit. If
encroachment permit Special Provisions allow for the
storage of equipment or materials within the State
highway right-of-way, the equipment and material storage must also comply with Section 7-1.04, Public Safety, of the Department’s Standard Specifications.

17. CARE OF DRAINAGE: Permittee must provide alternate
drainage for any work interfering with an existing drainage facility in compliance with the Department’s Standard
Specifications, Standard Plans, and/or as directed by the Department’s representative.

18. RESTORATION AND REPAIRS IN STATE HIGHWAY
RIGHT-OF-WAY: Permittee is responsible for restoration
and repair of State highway right-of-way resulting from permitted work (Streets and Highways Code, section 670
et seq.).

19. STATE HIGHWAY RIGHT-OF-WAY CLEAN UP: Upon
completion of work, Permittee must remove and dispose
of all scraps, refuse, brush, timber, materials, etc. off the State highway right-of-way. The aesthetics of the highway must be as it was before work started or better.

20. COST OF WORK: Unless stated otherwise in the
encroachment permit or a separate written agreement
with the Department, the Permittee must bear all costs
Redlands Regular Meeting of 03-04-2025 831 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 3 of 6 ends

© 2018 California Department of Transportation. All rights reserved. incurred for work within the State highway right-of-way and waives all claims for indemnification or contribution from the United States, the State, the Department, and
from the Directors, officers, and employees of the State and/or the Department. Removal of Permittee’s personal
property and improvements shall be at no cost to the
United States, the State, and the Department.

21. ACTUAL COST BILLING: When specified in the permit,
the Department will bill the Permittee actual costs at the currently set Standard Hourly Rate for encroachment
permits.

22. AS-BUILT PLANS: When required, Permittee must
submit one (1) set of folded as-built plans within thirty (30) calendar days after completion and acceptance of work in compliance with requirements listed as follows:
a) Upon completion of the work provided herein, the
Permittee must submit a paper set of As-Built plans
to the Department’s representative.
b) All changes in the work will be shown on the plans, as issued with the permit, including changes approved
by Encroachment Permit Rider.
c) The plans are to be prominently stamped or otherwise noted “AS-BUILT” by the Permittee’s representative
who was responsible for overseeing the work. Any
original plan that was approved with a Department
stamp, or by signature of the Department’s
representative, must be used for producing the AsBuilt plans. d) If construction plans include signing or striping, the dates of signing or striping removal, relocation, or
installation must be shown on the As-Built plans when
required as a condition of the encroachment permit.

When the construction plans show signing and
striping for staged construction on separate sheets,
the sheet for each stage must show the removal,
relocation, and installation dates of the appropriate
staged striping and signing.
e) As-Built plans must contain the Encroachment Permit
Number, County, Route, and Post Mile on each
sheet.
f) The As-Built Plans must not include a disclaimer
statement of any kind that differs from the obligations and protections provided by sections 6735 through
6735.6 of the California Business and Professions
Code. Such statements constitute non-compliance
with Encroachment Permit requirements and may
result in the Department retaining Performance
Bonds or deposits until proper plans are submitted.

Failure to comply may also result in denial of future
encroachment permits or a provision requiring a
public agency to supply additional bonding.

23. PERMITS FOR RECORD PURPOSES ONLY: When
work in the State highway right-of-way is within an area under a Joint Use Agreement (JUA) or a Consent to
Common Use Agreement (CCUA), a fee exempt
encroachment permit is issued to the Permittee for the
purpose of providing a notice and record of work. The
Permittee’s prior rights must be preserved without the
intention of creating new or different rights or obligations. “Notice and Record Purposes Only” must be stamped
across the face of the encroachment permit.

24. BONDING: The Permittee must file bond(s), in advance, in the amount(s) set by the Department and using forms
acceptable to the Department. The bonds must name the
Department as obligee. Failure to maintain bond(s) in full force and effect will result in the Department stopping all work under this encroachment permit and possibly
revoking other encroachment permit(s). Bonds are not
required of public corporations or privately-owned utilities unless Permittee failed to comply with the provisions
and/or conditions of a prior encroachment permit. The
surety company is responsible for any latent defects as provided in California Code of Civil Procedure section
337.15. A local public agency Permittee also must comply with the following requirements:
a) In recognition that project construction work done on State property will not be directly funded and paid by
State, for the purpose of protecting stop notice
claimants and the interests of State relative to
successful project completion, the local public agency
Permittee agrees to require the construction
contractor to furnish both a payment and performance
bond in the local public agency’s name with both
bonds complying with the requirements set forth in
Section 3-1.05 Contract Bonds of the Department’s
Standard Specifications before performing any
project construction work.
b) The local public agency Permittee must defend,
indemnify, and hold harmless the United States, the
State and the Department, and the Directors, officers,
and employees of the State and/or Department, from
all project construction related claims by contractors, subcontractors, and suppliers, and from all stop
notice and/or mechanic’s lien claimants. The local
public agency also agrees to remedy, in a timely
manner and to the Department’s satisfaction, any
latent defects occurring as a result of the project
construction work.

25. FUTURE MOVING OF INSTALLATIONS: Permittee
understands and agrees to relocate a permitted
installation upon notice by the Department. Unless under prior property right or agreement, the Permittee must
comply with said notice at the Permittee’s sole expense.

26. ENVIRONMENTAL:
a) ARCHAEOLOGICAL/HISTORICAL: If any
archaeological or historical resources are identified or encountered in the work vicinity, the Permittee must
immediately stop work, notify the Department’s
representative, retain a qualified archaeologist who
must evaluate the site at Permittee’s sole expense,
and make recommendations to the Department’s
representative regarding the continuance of work.
b) HAZARDOUS MATERIALS: If any hazardous waste
or materials (such as underground storage tanks,
asbestos pipes, contaminated soil, etc.) are identified or encountered in the work vicinity, the Permittee
must immediately stop work, notify the Department’s
representative, retain a qualified hazardous
Redlands Regular Meeting of 03-04-2025 832 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 4 of 6 ends

© 2018 California Department of Transportation. All rights reserved. waste/material specialist who must evaluate the site
at the Permittee’s sole expense, and make
recommendations to the Department’s representative
regarding the continuance of work.

Attention is directed to potential aerially deposited
lead (ADL) presence in unpaved areas along
highways. It is the Permittee’s responsibility to take all appropriate measures to protect workers in
conformance with California Code of Regulations
Title 8, Section 1532.1, “Lead,” and with Cal-OSHA
Construction Safety Orders, and to ensure roadway
soil management is in compliance with Department of
Toxic Substances Control (DTSC) requirements.
c) BIOLOGICAL: If any regional, state, or federally listed biological resource is identified or encountered in the work vicinity, the Permittee must immediately stop
work, notify the Department’s representative, retain a
qualified biologist who must evaluate the site at
Permittee’s sole expense, and make
recommendations to the Department’s representative
regarding the continuance of work.

27. PREVAILING WAGES: Work performed by or under an
encroachment permit may require Permittee’s contractors and subcontractors to pay appropriate prevailing wages
as set by the California Department of Industrial
Relations. Inquiries or requests for interpretations relative to enforcement of prevailing wage requirements must be
directed to the California Department of Industrial
Relations.

28. LIABILITY, DEFENSE, AND INDEMNITY: The Permittee
agrees to indemnify and save harmless the United States, the State, the Department, and the Directors, officers, employees, agents and/or contractors of the State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages, costs, liability, suits, or actions of every name, kind, and description, including but not limited to those brought for or on account of property damage, invasion of privacy, violation or deprivation of a right under a state or federal law, environmental damage or penalty, or injury to or death of any person including but not limited to members of the public, the Permittee, persons employed by the Permittee, and/or persons
acting on behalf of the Permittee, arising out of or in connection with: (a) the issuance and/or use of this
encroachment permit; and/or (b) the encroachment, work, and/or activity conducted pursuant to this encroachment permit, or under color of authority of this encroachment permit but not in full compliance with the Permit
Conditions as defined in General Provision Number 5
(“Unauthorized Work or Activity”); and/or (c) the
installation, placement, design, existence, operation,
and/or maintenance of the encroachment, work, and/or
activity; and/or (d) the failure by the Permittee, or by anyone acting for or on behalf of the Permittee, to perform the Permittee’s obligations under any part of the Permit Conditions as defined in General Provision Number 5, in respect to maintenance or any other obligation; and/or (e) any change to the Department’s property or adjacent
property, including but not limited to the features or
conditions of either of them, made by the Permittee or
anyone acting on behalf of the Permittee; and/or (f) a
defect or obstruction related to or caused by the
encroachment, work, and/or activity whether conducted in compliance with the Permit Conditions as defined in
General Provision Number 5 or constituting Unauthorized Work or Activity, or from any cause whatsoever. The duty of the Permittee to indemnify and save harmless includes the duties to defend as set forth in Section 2778 of the Civil Code.

It is the intent of the Department and the Permittee
that except as prohibited by law, the Permittee will defend, indemnify, and hold harmless as set forth in this General Provision Number 28 regardless of the existence or
degree of fault or negligence, whether active or passive, primary or secondary, on the part of: the United States, the State; the Department; the Directors, officers,
employees, agents and/or contractors of the State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors; the Permittee; persons employed by the Permittee; and/or persons
acting on behalf of the Permittee.

The Permittee waives any and all rights to any type of
expressed or implied indemnity from or against the United States, the State, the Department, and the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors.

The Permittee understands and agrees to comply
with the obligations of Titles II and III of the Americans with Disabilities Act in the conduct of the encroachment, work, and/or activity whether conducted pursuant to this encroachment permit or constituting Unauthorized Work
or Activity, and further agrees to defend, indemnify, and save harmless the United States, the State, the
Department, and the Directors, officers, employees,
agents, and/or contractors of the State and/or of the
Department, including but not limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages, costs, penalties, liability,
suits, or actions of every name, kind, and description
arising out of or by virtue of the Americans with Disabilities Act.

The Permittee understands and agrees the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors, are not personally responsible for any liability arising from or by virtue of this encroachment permit.

For the purpose of this General Provision Number 28
and all paragraphs herein, “contractors of the State and/or of the Department” includes contractors, and their
subcontractors, under contract to the State and/or the
Department.

This General Provision Number 28 and all
paragraphs herein take effect immediately upon issuance of this encroachment permit, and apply before, during,
and after the encroachment, work, and/or activity
Redlands Regular Meeting of 03-04-2025 833 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 5 of 6 ends

© 2018 California Department of Transportation. All rights reserved. contemplated under this encroachment permit, whether
such work is in compliance with the Permit Conditions as defined in General Provision Number 5 or constitutes
Unauthorized Work or Activity, except as otherwise
provided by California law. The Permittee’s obligations to defend, indemnify, and save harmless under this General Provision Number 28 take effect immediately upon
issuance of this encroachment permit and have no
expiration date, including but not limited to situations in which this encroachment permit expires or is revoked, the work or activity performed under this encroachment
permit is accepted or not accepted by the Department, the encroachment, work, and/or activity is conducted in
compliance with the Permit Conditions as defined in
General Provision Number 5 or constitutes Unauthorized
Work or Activity, and/or no work or activity is undertaken by the Permittee or by others on the Permittee’s behalf.

If the United States or an agency, department, or
board of the United States is the Permittee, the first two paragraphs of this General Provision Number 28
(beginning “The Permittee agrees to indemnify…” and “It is the intent of the parties…”) are replaced by the following paragraph:

Claims for personal injury, death, or property damage
allegedly caused by the negligent or wrongful act or
omission of any employee of the United States acting
within the scope of their official duties are subject to the Federal Tort Claims Act, as amended, 28 U.S.C. § 1346
and § 2671 et seq. (Chapter 171).

29. NO PRECEDENT ESTABLISHED: This encroachment
permit is issued with the understanding that it does not establish a precedent.

30. FEDERAL CIVIL RIGHTS REQUIREMENTS FOR
PUBLIC ACCOMMODATION: a) As part of the consideration for being issued this encroachment permit, the Permittee, on behalf of
Permittee and on behalf of Permittee’s personal
representatives, successors in interest, and assigns,
does hereby covenant and agree that:
i) No person on the grounds of race, color, or
national origin may be excluded from participation
in, be denied the benefits of, or be otherwise
subjected to discrimination in the use of said
facilities.
ii) That in connection with the construction of any
improvements on said lands and the furnishings
of services thereon, no discrimination must be
practiced in the selection and retention of first-tier
subcontractors in the selection of second-tier
subcontractors.
iii) That such discrimination must not be practiced
against the public in their access to and use of the
facilities and services provided for public
accommodations (such as eating, sleeping, rest,
recreation), and operation on, over, or under the
space of the State highway right-of-way.
iv) That the Permittee must use the premises in
compliance with all other requirements imposed
pursuant to Title 15, Code of Federal
Regulations, Commerce and Foreign Trade,
Subtitle A. Office of the Secretary of Commerce,
Part 8 (15 C.F.R. Part 8) and as said Regulations
may be amended.
b) That in the event of breach of any of the above
nondiscrimination covenants, the State and the
Department have the right to terminate this
encroachment permit and to re-enter and repossess
said land and the facilities thereon and hold the same
as if said permit had never been made or issued.

31. MAINTENANCE: The Permittee is responsible at
Permittee’s sole expense for the encroachment, and the
inspection, maintenance, repair, and condition thereof, and is responsible to ensure the encroachment does not
negatively impact State highway safety, maintenance,
operations, construction, State facilities, activities related to construction/reconstruction, or other encroachments.

The Permittee’s obligations in the preceding sentence
take effect immediately upon issuance of this
encroachment permit and continue until the
encroachment is entirely and permanently removed.

Additional encroachment permits or approval documents
may be required authorizing work related to inspection, repair, and/or maintenance activities. Contact the
Department for information.

32. SPECIAL EVENTS: In accordance with subdivision (a) of Streets and Highways Code section 682.5 and 682.7, the
Department is not responsible for the conduct or
operation of the permitted activity, and the applicant
agrees to defend, indemnify, and hold harmless the
United States, the State, the Department, and the
Directors, officers, employees, agents, and contractors of the State and/or of the Department, including but not
limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages,
costs, liability, suits, or actions of every name, kind and description arising out of any activity for which this
encroachment permit is issued.

The Permittee is required, as a condition of this
encroachment permit, for any event that awards prize
compensation to competitors in gendered categories, for any participant level that receives prize compensation, to ensure the prize compensation for each gendered
category is identical at each participant level. (Streets and Highways Code, section 682.7.)
The Permittee understands and agrees to comply
with the obligations of Titles II and III of the Americans with Disabilities Act in the conduct of the event, and
further agrees to defend, indemnify, and save harmless
the United State, the State and the Department, and the Directors, officers, and employees of the State and/or
Department, including but not limited to the Director of the Department and the Deputy Directors, from any and all
claims, demands, damages, costs, liability, suits, or
actions of every name, kind and description arising out of or by virtue of the Americans with Disabilities Act.

33. PRIVATE USE OF STATE HIGHWAY RIGHT-OF-WAY:

State highway right-of-way must not be used for private purposes without compensation to the State. The gifting Redlands Regular Meeting of 03-04-2025 834 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS

Page 6 of 6 ends

© 2018 California Department of Transportation. All rights reserved. of public property uses and therefore public funds is
prohibited under the California Constitution, Article XVI, Section 6.

34. FIELD WORK REIMBURSEMENT: Permittee must
reimburse the Department for field work performed by or on behalf of the Department to correct or remedy issues created by the Permittee or by others acting on behalf of the Permittee, including but not limited to hazards or
damaged facilities, or to clear refuse, debris, etc. not attended to by the Permittee or by others acting on behalf of the Permittee.

35. LANE CLOSURE REQUEST SUBMITTALS AND

NOTIFICATION OF CLOSURES TO THE
DEPARTMENT: Lane closure request submittals and
notifications must be in accordance with Section 12-4.02, and Section 12.4-04, of the Department’s Standard
Specifications or as directed by the Department’s
representative. The Permittee must notify the
Department’s representative and the Traffic Management
Center (“TMC”) before initiating a lane closure or
conducting an activity that may cause a traffic impact. In emergency situations when the corrective work or the
emergency itself may affect traffic, the Department’s
representative and the TMC must be notified as soon as
possible.

36. SUSPENSION OF TRAFFIC CONTROL OPERATION:

The Permittee, upon notification by the Department’s
representative, must immediately suspend all traffic lane, bike lane, sidewalk, crosswalk, and/or shoulder closure operations and any operation that impedes the flow of
traffic. All costs associated with this suspension must be borne by the Permittee.

37. UNDERGROUND SERVICE ALERT (USA)
NOTIFICATION: Any excavation requires compliance
with the provisions of Government Code section 4216 et
seq., including but not limited to notice to a regional notification center, such as Underground Service Alert
(USA). The Permittee must provide notification to the
Department representative at least five (5) business days before, and the regional notification center at least fortyeight (48) hours before, performing any excavation work within the State highway right-of-way.

38. COMPLIANCE WITH THE AMERICANS WITH
DISABILITIES ACT (ADA): All work within the State
highway right-of-way to construct and/or maintain any
public facility must be designed, maintained, and
constructed strictly in accordance with all applicable
Federal Access laws and regulations (including but not
limited to Section 504 of the Rehabilitation Act of 1973, codified at 29 U.S.C. § 794), California Access laws and regulations relating to ADA, along with its implementing regulations, Title 28 of the Code of Federal Regulations Parts 35 and 36 (28 C.F.R., Ch. I, Part 35, § 35.101 et seq., and Part 36, § 36.101 et seq.), Title 36 of the Code of Federal Regulations Part 1191 (36 C.F.R., Ch. XI, Part 1191, § 1119.1 et seq.), Title 49 of the Code of Federal Regulations Part 37 (49 C.F.R., Ch. A, Part 37, § 37.1 et seq.), the United States Department of Justice Title II and Title III for the ADA, and California Government Code
section 4450 et seq., which require public facilities be made accessible to persons with disabilities.

Notwithstanding the requirements of the previous
paragraph, all construction, design, and maintenance of public facilities must also comply with the Department’s Design Information Bulletin 82, “Pedestrian Accessibility Guidelines for Highway Projects” and Standard Plans &
Specifications on “Temporary Pedestrian Access
Routes.”

39. STORMWATER: The Permittee is responsible for full
compliance with the following:
a) For all projects, the Department’s Storm Water
Program and the Department’s National Pollutant
Discharge Elimination System (NPDES) Permit
requirements under Order No. 2012-0011-DWQ,
NPDES No CAS000003; and
b) In addition, for projects disturbing one acre or more of soil, with the California Construction General
Permit Order No. 2009-0009-DWQ, NPDES No
CAS000002; and
c) In addition, for projects disturbing one acre or more of soil in the Lahontan Region with Order No. R6T-2016-
0010, NPDES No CAG616002.
d) For all projects, it is the Permittee’s responsibility to install, inspect, repair, and maintain all facilities and devices used for water pollution control practices
(Best Management Practices/BMPs) before
performing daily work activities.

Redlands Regular Meeting of 03-04-2025 835 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT SPECIAL PROVISIONS
© 2018 California Department of Transportation. All Rights Reserved.

UTILITY ANNUAL PROVISIONS
TR – 0160 (Rev. 7/2022)
In addition to the attached Encroachment Permit General Provisions (TR-0045), the following special provisions are also applicable:

Annual utility permits UE are issued to utilities who maintain their facilities within State highway right-of-way.

Any utility or public corporation, who lawfully maintains a utility encroachment, or their agent, may perform routine or emergency maintenance on such facility in accordance with the following provisions:

UE1. EXCLUSIONS: These provisions do not
authorize any work on freeways and expressways, tree
trimming, aerial capacity increases on designated
"Scenic Highways", pole replacement / relocation
work, or other activities not specifically provided for in this permit.

UE2. EMERGENCY REPAIRS: The permittee
may make emergency repairs, alter traffic flow, and
excavate through improved surfaces only when breaks
in the conduit, cable, or pipeline over or under the
pavement presents a definite public hazard or serious
interruption of essential services. An emergency is
defined in the Public Resources Code as “[…] a sudden,
unexpected occurrence, involving a clear and imminent
danger, demanding immediate action to prevent or
mitigate loss of, or damage to, life, health, property, or essential public service. ‘Emergency’ includes such
occurrences as fire, flood, earthquake, or other soil or geologic movements, as well as such occurrences as
riot, accident, or sabotage.” In such cases, the
Department's representative shall be notified
immediately.

Replace poles knocked down by vehicles, accidental
causes or natural disasters. The entire length of poles and stubs must be removed from the ground and
replacement pole must be placed at the exact location.

Planned pole replacements/installations are not allowed under this permit.

UE3. OPEN EXCAVATIONS: Excavation must
not be left open after daylight hours unless specifically authorized and adequate protection for traffic is
provided in accordance with the Encroachment Permit
General Provisions, "Public Traffic Control" And
“Minimum Interference with Traffic”. Backfill and
pavement replacement must be performed in
accordance with General Provisions, "Restoration and
Repairs in State Highway right-of-way."
UE4. TRAFFIC CONTROL: Work requiring
traffic control shall be conducted between MondayFriday 9:00 a.m. and 3:00 p.m. or as otherwise authorized by the Permit Engineer. Adequate traffic
control must be provided in accordance with the
Encroachment Permit General Provisions, “Public
Traffic Control”, “Minimum Interference with Traffic”
and “Suspension of Traffic Control Operation.”
Only those maintenance activities that can be performed using a Caltrans Standard Plans for Temporary Traffic
Control Systems and Temporary Pedestrian Access
Routes are authorized under the annual maintenance
permit. Otherwise a separate permit application for the work, along with a traffic control plan designed and
signed by a California Registered Civil or Traffic
Engineer must be submitted for review and approval.

Advanced notification must be provided to Caltrans
Traffic Management Center for any activities that may
cause a traffic impact including all lane closures.

Adequate notice must be provided in accordance with
the Encroachment Permit General Provisions,
“Notification of Closure to Department and Traffic
Management Center (TMC).”
UE5. WORK PERMITTED - AERIAL: All
permitted activity must not be over the traveled way or within the limits of officially designated scenic
highways and/or on Caltrans structures.

1. Maintain, inspect, remove, repair or replace (in the same location) all aerial facilities. Work over the
traveled way requires a separate permit and the
placement of “H” poles and netting as per form TR0108, located in Appendix “E” of the Encroachment Permits Manual.

Redlands Regular Meeting of 03-04-2025 836 of 1100
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT SPECIAL PROVISIONS
© 2018 California Department of Transportation. All Rights Reserved.

Replace broken pins and/or insulators, repair
broken wires, pull slack wires, and replace or pull
broken or slack guys.

Replace aerial wires and cross arms on existing
poles except where wires cross the highway. Unless
otherwise specifically required by the Department,
protected cable, tree wire or plastic tree wire guard
used for communication lines may be used through
trees where necessary, provided the appearance of
the tree or the tree itself will not be damaged.

Perform insulator washing and interconnect
splicing of cables.

Install additional capacity (in the same location),
install, maintain, remove, repair or replace aerial
service connections with potential to ground of 300
volts or less.

2. Installations and clearances must be equal to those
required by either the California Public Utilities
Commission orders or the Division of Occupational
Safety and Health (Cal/OSHA) regulations
promulgated in the California Code of Regulations,
Title 8, Chapter 4, whichever is more restrictive.

UE6. WORK PERMITTED - UNDERGROUND:

1. Maintain, inspect, remove, repair or replace (in the same location) all underground facilities except
those requiring trenching in the traveled way or
require uncovering more than 50 feet of line at any
one time. The permittee may open existing
manholes to repair underground cables. Where the
manhole lies within the improved surface of the
highway, the permittee will provide adequate
protection for traffic in accordance with the
Encroachment Permit General Provisions "Public
Traffic Control" and “Minimum Interference with
Traffic”.

2. Install additional capacity in existing ducts except for facilities not in compliance with the
Department's High priority utility policies or on
Structures.

3. Install air flow monitoring transducers and piping
in existing ducts.

4. Barholing, potholing, cleaning, rodding and placing
float ropes.

5. Adjust access cover to grade and replace in kind or
with larger size pull boxes.

6. Interconnect splicing of cables.

7. Install service connections (laterals) perpendicular to the highway for the following:
i.Natural gas service lines less than 2 inches in pipe
diameter that have normal operating pressures of 60
psig or less
ii.Subsurface electrical service connections with a
potential to ground of 50 volts or less
iii.Service connections for water, sewer, telephone,
telecommunication, and cable service

8. Permanent pavement patching for work authorized by
this permit. The patching must be made within thirty
(30) days of completion of backfill unless otherwise
specified by the Permit Engineer. See Underground
Utility Provision UG 9 (form TR-0163).

UE7. POLE MAINTENANCE &
CHEMICAL TREATMENT:

1. Utility Companies are to provide a list of the pole
identification, locations, type of chemicals and
quantities used for their pole treatment maintenance
operations. This information must be provided upon
expiration of their annual permit or upon request of the Department as needed.

2. Utility Companies must submit copies of the Safety
Data Sheets (SDS) for all chemical compounds to be
used in their pole treatment maintenance operations, in conjunction with the permit application submittal.

3. Utility Companies are to notify the District Landscape Specialist or their designee and the District
Encroachment Permits Office when there is any change
or modification in the type(s) of chemical used in their pole treatment maintenance operations.

4. Prior to any application of Tree Growth Regulators
(TGR) approval shall be obtained from the District
Landscape Specialist or their designee.

UE8. MISCELLANEOUS:

1. Install new and replace existing transformers on
existing poles.

2. Clear grass from around base of poles and excavate
around poles for inspection, including tamping and
straightening. The use of herbicides or other chemicals is not authorized by this permit. A separate
encroachment permit is required for that purpose.

Redlands Regular Meeting of 03-04-2025 837 of 1100
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Page 1 of 3

ENCROACHMENT PERMIT SPECIAL PROVISIONS

STORMWATER SPECIAL PROVISIONS FOR MINIMAL OR NO

IMPACT (SWSP)
TR-0400 (Rev 05/2018)

1. GENERAL: The purpose of these Special Provisions
is to provide the Permittee with specifications for
water pollution control to minimize, prevent, or
control the discharge of material into the air, surface waters, groundwater, and storm sewers owned by the
State or local agencies. These provisions are not
intended to take the place of the Caltrans Water
Pollution Control Program (WPCP) for projects where
soil disturbance from work activities less than one
acre, or work activities of one acre or more subject to the preparation of the Caltrans Storm Water Pollution
Prevention Plan (SWPPP). The Permittee must
comply with the following Special Provisions and the
direction of the State Representative. All Stormwater
Best Management Practices (BMPs) must conform to
Section 13 Water Pollution Control of Caltrans’
Standard Specifications.

2. NPDES REQUIREMENTS: The Permittee must be
responsible for full compliance with the Caltrans
Storm Water Program and the Caltrans National
Pollutant Discharge Elimination System (NPDES)
Permit requirements (Order No. 2012-0011-DWQ,
NPDES No CAS000003) and for and projects
disturbing one acre or more of soil, full compliance
with the California Construction General Permit
(Order No. 2009-0009-DWQ, NPDES No
CAS000002) or for projects for projects that have one
acre or more of soil disturbance in the Lahontan
Region (Order No. R6T-2016-0010, NPDES No
CAG616002). It is the Permittee’s responsibility to
install, inspect, and repair or maintain facilities and devices used for water pollution control practices
(BMPs) before performing daily work activities.

Installation, inspection and maintenance
responsibilities on the job site include: 1) soil
stabilization materials in work areas that are inactive or prior to storm events, 2) water pollution control
devices to control sediment and erosion, 3)
implementation of spill and leak prevention
procedures for chemical and hazardous substances
stored on the job site, 4) material storage, 5) stockpile management, 6) waste management, 7) nonstormwater management, 8) water conservation, 9) tracking controls and 1 0 ) illicit connection, illegal discharge detection and reporting. The Permittee
must report to the State representative when
discharges enter into receiving waters, adjacent
property, drainage systems or when discharges could
be a cause or a threat for water pollution. The
Permittee must also control illicit discharges or illegal dumping prior to start of daily work schedule.

Copies of written notices or orders from the Regional
Water Quality Control Board or other regulatory
agency must be provided to the State representative
within 48 hours of reported activity. F or additional
information on stormwater compliance, visit the State
Water Resources Control Boards storm water
Website at:
http://www.waterboards.ca.gov/water_issues/progra
ms/stormwater

3. RESPONSIBILITY FOR DEBRIS REMOVAL: The
Permittee must be responsible for preventing
sediment, trash, debris, and other construction waste
from entering the street, the storm drains, local
creeks, or any other bodies of water.

4. SPOILS AND RESIDUE: The Permittee must
vacuum any saw-cut concrete waste material, debris,
residue, etc. No spoils, debris, residue, etc. must be
washed into a drainage system.

5. SWEEPING: Sweep paved roads at construction
entrance and exit locations and surrounding paved
areas daily within the job site during: 1) clearing and grubbing, 2) earthwork, 3) trenching, 4) soil
disturbance, 5) pavement grinding and/or cutting, and
6) after observing tracking of material onto or off the State property. Keep dust to a minimum during
sweeping activities. Use vacuum whenever dust
generation is excessive or sediment pickup is
ineffective.

Roadways or work areas must not be washed down
with water. Street sweeping operations must conform
to Section 13 Water Pollution Control of Caltrans’
Standard Specifications.

6. VEHICLES AND EQUIPMENT: Permittee must
prevent all vehicles, equipment, etc. from leakage or
mud tracking onto roadways. If leaks cannot be
repaired immediately, remove the vehicle or
equipment from the job site.

7. MAINTENANCE AND FUELING OF VEHICLES
AND EQUIPMENT: Maintenance and fueling of
equipment must not result in any pollution at the job
site. The Permittee must immediately clean up
spills/leaks, and properly dispose of contaminated soil and materials.

8. CLEANING VEHICLES AND EQUIPMENT: Limit
vehicle and equipment cleaning or washing at the job
site except what is necessary to control vehicle
tracking or hazardous waste. The Permittee must
clean all equipment within a bermed area or over a drip pan large enough to prevent run-off. No soaps,
solvents, degreasers, etc. must be used in State rightof-way. Any water from this operation must be collected and disposed of at an appropriate site.

Containment berms or dikes must be used for fueling,
washing, maintaining and washing vehicles or
equipment in outside areas. Containment must be
performed at least 100 feet from concentrated flows of
Redlands Regular Meeting of 03-04-2025 838 of 1100
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Page 2 of 3

ENCROACHMENT PERMIT SPECIAL PROVISIONS
storm water, drainage courses, and storm drain inlets
if within a flood plain, otherwise at least 50 feet if
outside the floodplain. Keep adequate quantities of
absorbent spill- cleanup material and spill kits in the fueling or maintenance area and on fueling trucks.

9. DIESEL FUELS: The use of diesel fuel from
petroleum or other fossil fuel as a form-oil or solvent is not allowed.

10. WEATHER CONDITIONS AT WORKSITE: Any
activity that would generate fine particles or dust that could be transported off site by stormwater must be
performed during dry weather.

11. WIND EROSION PROTECTION: The use of Wind
Erosion BMPs must be deployed year-round in
instances where dust or fine particles could be
transported off site.

12. HOT MIX ASPHALT: Runoff from washing hot mix
asphalt must not enter into any drainage
conveyances.

13. PROTECTION OF DRAINAGE FACILITIES: The
Permittee must protect/cover gutters, ditches,
drainage courses, and inlets with gravel bags, fiber
rolls, State approved fabric filters, etc., to the
satisfaction of the State representative during grading, paving, saw-cutting, etc. and materials must conform
to Section 13-6.02 Materials for Water Pollution
Control of Caltrans’ Standard Specifications. No such
protection measures must cause an obstruction to the
traveling public. The Permittee must implement spill
and leak prevention procedures for chemicals and
hazardous substances stored on the job site (including
secondary containment requirements) in accordance
with section 13-4.03B Spill Prevention and Control,
and 14-11 Hazardous Waste and Contamination,
Water Pollution Control of Caltrans’ Standard
Specifications.

14. PAINT: Rinsing of painting equipment and materials
is not permitted in State right-of-way. When thoroughly dry, dispose of the following as solid waste: dry latex paint, paint cans, used brushes, rags, gloves,
absorbent materials, and drop cloths. Oil based paint
sludge and unusable thinner must be disposed of at an
approved hazardous waste site.

15. CONSTRUCTION MATERIALS: Stockpile of all
construction materials, including, but not limited to;
pressure treated wood, asphalt concrete, cold mix
asphalt concrete, concrete, grout, cement containing
premixes, and mortar, must conform to section
13-4.03C (2) Material Storage & 13-4.03C (3)
Stockpile Management of Caltrans’ Standard
Specifications.

16. CONCRETE EQUIPMENT: Concrete equipment
must be washed in a designated washing area in a way
that does not contaminate soil, receiving waters, or
storm drain systems.

17. EXISTING VEGETATION: Established existing
vegetation is the best form of erosion control. Minimize disturbance to existing vegetation. Damaged or
removed vegetation must be replaced as directed by
the State Representative.

18. SOIL DISTURBANCE: Soil disturbing activities must
be avoided during the wet weather season. I f
construction activities during wet weather are allowed
in your permit, all necessary erosion control and soil
stabilization measures must be implemented in
advance of soil disturbing activity.

19. SLOPE STABILIZATION AND SEDIMENT
CONTROL: Consider a certified expert in Erosion and
Sediment control in cases where slopes are disturbed
during construction. The Permittee is directed to
comply with Section 13.5 Temporary Soil Stabilization
and Section 21 Erosion Control of Caltrans’ Standard
Specifications during application of temporary soil
stabilization measures to the soil surface. Fiber rolls or silt fences may be required down slope until permanent
soil stabilization is established. Remove the
accumulated sediment whenever the sediment
accumulates to 1/3 of the linear sediment barrier
height. The Permittee must limit the use of plastic
materials when more sustainable, environmentally
friendly alternatives exist or when environmental
regulations prohibit their use within the project.

20. STOCKPILES: Stockpiles containing aggregate
and/or soil must be stored at least 100 feet from
concentrated flows of storm water, drainage courses,
and storm drain inlets if within a flood plain, otherwise at least 50 feet if outside the floodplain, and must be covered and protected with a temporary perimeter
sediment barrier. Cold mix stockpiles must be stored
on an impermeable surface and covered with 9 mil
plastic to prevent contact with water. Minimize
stockpiling of materials on the job site. Manage
stockpiles by implementing the water pollution control
practices in Section 13-4.03C (3) Stockpile
Management of the State of California standard
specifications for construction.

21. DISCOVERY OF CONTAMINATION: The State
Representative must be notified in case any unusual
discoloration, odor, or texture of ground water, is found in excavated material or if abandoned, underground
tanks, pipes, or buried debris are encountered.

22. SANITARY AND SEPTIC WASTE: Do not bury or
discharge wastewater from a sanitary or septic system
within the highway. Properly connected sewer facilities are free from leaks. With State Representative
approval place portable sanitary facility at least 50 feet away from storm drains, receiving waters, and flow
lines. Permittee must comply with local health agency
provisions when using an on-site disposal system.

23. LIQUID WASTE: Prevent job site liquid waste from
entering storm drain systems and receiving waters.

Drilling slurries, grease or oil-free waste water or rinse water, dredging, wash water or rinse water running off
a surface or other non-storm water liquids not covered
Redlands Regular Meeting of 03-04-2025 839 of 1100
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Page 3 of 3

ENCROACHMENT PERMIT SPECIAL PROVISIONS
under separate waste water permits must be held in
structurally sound, leak-proof containers, such as
portable bins or portable tanks. Store containers at
least 50 feet away from moving vehicles and
equipment. Liquid waste may require testing to
determine hazardous material content prior to
disposal. All measures must conform to section
13-4.03D (5) Liquid Waste, Water Pollution Control of
Caltrans’ Standard Specifications.

24. WATER CONTROL AND CONSERVATION:

Manage water use in a w ay that will prevent erosion
and the discharge of pollutants into storm drain
systems and receiving waters. Direct runoff, including
water from water line repair from the job site to areas where it can infiltrate into the ground. Direct water from off-site sources around the job site or from contact with jobsite runoff.

25. PILE DRIVING: Keep spill kits and cleanup materials at pile driving locations. Park pile driving equipment
over drip pans, absorbent pads, or plastic sheeting with absorbent material, and away from stormwater run-on
when not in use.

26. DEWATERING: Dewatering consists of discharging
accumulated storm water, groundwater, or surface
water from excavations or temporary containment
facilities. All dewatering operations must comply with
the latest Caltrans guidelines including the Field Guide for Construction Site Dewatering. Contact State
representative for approval of dewatering discharge by
infiltration or evaporation, otherwise, any effluent
discharged into a permitted storm water system
requires approval from the Regional Water Quality
Control Board. Prior to the start of dewatering, the
Permittee must provide the State Representative with
a dewatering and discharge work plan that complies
with section 13-4.03G Dewatering, Water Pollution
Control of Caltrans’ Standard Specifications. A copy of the Waste Discharge Permit and a copy of a valid
WDID number issued by the Regional Board must be
provided to the State representative.

Redlands Regular Meeting of 03-04-2025 840 of 1100

STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT TRENCH DETAIL
TR - 0153 (Rev. 07/2021) Page 1 of 2

TYPICAL TRENCH DETAILS
Notes: D - Depth of cover as
identified & approved
based on submitted plans.

FG - Finish Grade.

OG - Original Ground.

All work must be authorized by the encroachment permit, and/or as directed by the State's representative. (Notes continue on page 2)
Redlands Regular Meeting of 03-04-2025 841 of 1100

STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT TRENCH DETAIL
TR - 0153 (Rev. 07/2021) Page 2 of 2
Must include tracer wire or other continuous measure to provide positive subsurface detection for the life of the facility (Project Development Procedures Manual (PDPM) Chapter 17).

Open trench installation of underground utility facilities must include warning tape or warning mats complying with the American Public Works Association (APWA) Uniform Color Code for identifying the type of underground utility. Where mechanical protection is installed, warning tape must be placed above the mechanical protection and below the roadbed subgrade as shown on the details. (PDPM Chapter 17).

Clearance between the trench wall and conduit of less than 6 inches in width shall be a minimum of 2 inches.

Clearance between the trench wall and conduit of greater than 6 inches in width shall be a minimum of 6 inches.

When the trench width is less than 24 inches the backfill for subgrade must consist of slurry cement. Controlled Low-Strength Material (CLSM) can be substituted at the discretion of the State’s representative.

When trench width is greater than 24 inches compacted aggregate base may be used for backfilling.

Structure backfill and compaction must conform to Section 19-3.02C and 3.03 of the Standard Specifications.

For trench located under unimproved surface, structure backfill can use the original soil. Soil must be compacted by mechanical means. Ponding, jetting or flooding are not allowed. Slurry cement backfill is not optional unless approved by the Caltrans District.

Slurry cement backfill must conform to Section 19-3.02E of the Standard Specifications.

Aggregate base and its compaction shall conform to Section 26 of the Standard Specifications.

CLSM if used must conform to Section 19-3.02G of the Standard Specifications. When CLSM is utilized the mix design and test results must be submitted to the State's representative. See Appendix H of the Encroachment Permits Manual for additional information.

Cold planed surface and overlay shall be to the nearest lane line for the entire length of the trench/disturbed areas, and/or as directed by the State's representative.

When Hot mix asphalt (HMA) is used to backfill Asphalt Concrete (AC) Section of the road, HMA must conform to Section 39 of the Standard Specifications.

A paving notch (“T” Cut) shall be cold planed in exist asphalt concrete to a minimum width of 12 inches beyond each side of the trench and to a depth of 3 inches for the final layer of HMA.

AC used to replace pavement section shall match existing pavement depth, unless directed otherwise by the State’s representative.

A tack coat of asphaltic emulsion conforming to Section 39-2.01C (3) (f) shall be applied.

When the trench is within 4 feet of curb and gutter, additional cold planning may be required at the discretion of the State's representative. Potholes or trenches separated / adjoined by 10 feet or less to be overlaid together at the discretion of the State's representative.

Pavement markings and/or striping removed or damaged during construction must be replaced in kind as directed by the State's representative.

Other trench related details are shown in Chapter 6 of the Encroachment Permits Manual as well as the Trenching and Shoring Manual. Both publications can be found on the State of California, Department of Transportation’s website.

If trench is located in the roadway where Portland Cement Concrete (PCC) exist, remove the concrete to a depth of at least 3 feet below finished grade as per standard Specification 15-1.03B. Replace entire concrete slab from joint to joint as directed by State's representative.

Electrical systems installations that are part of State Highway System must be installed in compliance with Caltrans Standard Specifications, Section 87.

Redlands Regular Meeting of 03-04-2025 842 of 1100




 
 

! ""#$%&'#()*(+,
-

-&./%0"1(,)$+0($/2#)%+#'&#343&556#$0)7*$%#7%/+0*./(&5+048&#579#+'&$#4: 5#(4#%(;#)0%# 0"*<7(%#770$*2#)%4()7%/#5&);%0%/#&./%0")%+,0+%(5:)$+0($/2#)%4%/(%3&55#=$##7>? @7(,40)0+)#(+%/#+(&5+0(7 +&./%@0"@3(,3&55$0)%&)*#%06#+#'&#3#7()7<+0$#44#76,9A:!! ()*(+,+()4&%&0)8B4CD.506(5(44#%4D(60*%D#).&)##+&).D+&./%@0"@#)%+,@%+()4&%&0)@"+#E*#)%5,@(4;#7@E*#4%&0)4:<7"F 4<(+%0"%/&4%+()4&%&0)-%/#+#2(,6#7#5(,4%0$0++#4<0)7#)$#4()7(<<5&$(%&0)<+0$#44&).:1#(<<+#$&(%#,0*+<(%&#)$#()7 %/();,0*"0+,0*+*)7#+4%()7&).(43#20'#%02(;#&2<+0'#2#)%4%0%/#&./%@0"@)%+,<+0$#44: 5#(4#/#5<*42&)&2&G# (77&%&0)(57#5(,46,"(2&5&(+&G&).,0*+4#5"3&%/%/#&)"0+2(%&0)0)%/&44&%#()770$*2#)%4('(&5(65#*)7#+%/##40*+$#44#$%&0) 6#503:! HIJKHLMNOKPKQRSTMUKVHPQWKXJYMLZ[JTZKYUM\]KMKNLRZRNMUKL^UJKRTKZIJK[MRTZJTMTNJK^_K`JZL^URTOa]KHLMNOKMTbKQRSTMUKcT_LM]ZLdNZdLJeKJT]dLRTSKM ]M_JKMTbKJ__JNZRfJK^YJLMZRTSKJTfRL^T[JTZK_^LKZLMRT]KMTbKYM]]JTSJL]gKcTKMbbRZR^TKZ^K[MRTZMRTRTSKZIJKZLMNO]KMTbK]RSTMU]eKZIJKHLMNOKP QRSTMUKXJYMLZ[JTZK^fJL]JJ]KZIJKN^^LbRTMZR^TKMTbK^fJL]RSIZK^_Kh KYMLZ\KJTZL\K^TZ^KZIJK`JZL^URTOKiRSIZK^_KjM\gKHIR]KJT]dLJ]KZIMZKMUUKh YMLZ\KYL^kJNZ]KMLJKN^TbdNZJbKRTKMK]M_JK[MTTJLKML^dTbKMNZRfJKZLMRTKZLMNO]eKN^[YU\KlRZIKMUUK`JZL^URTOeKQZMZJeKMTbKmJbJLMUKiJSdUMZR^T]eKMTb JT]dLJKN^[YMZRnRURZ\KlRZIK`JZL^URTOa]KRT_LM]ZLdNZdLJKMTbK^YJLMZR^T]gK! c_K\^dKIMfJKMKYL^kJNZKZIMZKlRUUKnJKN^TbdNZJbK^TK^LKlRZIRTKNU^]JKYL^oR[RZ\K^_KZIJK`JZL^URTOKiRSIZK^_KjM\eKYUJM]JKLJfRJlKZIJKQpiiqKiRSIZK^_ jM\KrTNL^MNI[JTZKsL^NJ]]KMTbKtUUK^dZKMKiRSIZK^_KjM\KrTNL^MNI[JTZKqYYURNMZR^Tg!KqTKMYYURNMZR^TK_JJKR]KLJudRLJbKMZKZIJKZR[JK^_ ]dn[R]]R^TKMTbK[M\KnJKYMRbKn\KNIJNOK^LKqpvKYM\[JTZgK! c_KMKTJlK^LKLJfR]R^TKZ^KMTKJoR]ZRTSKwRNJT]JKR]K)0%KLJudRLJbeKZIJKcTRZRMUKqYYURNMZR^T MTbKp^T]ZLdNZR^TK]dn[RZZMU]K[M\KnJK]JTZKZ^KQpiiqKMZKZIJK]M[JKZR[Jg x^dLKN^^YJLMZR^TKIJUY]KJT]dLJKMK]M_JKMTbKJ__JNZRfJK^YJLMZRTSKJTfRL^T[JTZK_^LKJfJL\^TJgKm^LKYL^kJNZ]K^TK^LKMbkMNJTZKZ^KZIJKLMRUL^Mb LRSIZy^_ylM\K_^LKUJ]]KZIMTKz{|ybM\]eK]dn[RZKZIJKiRSIZy^_yrTZL\KMYYURNMZR^TKZIL^dSIKZIJK`JZL^URTOKsJL[RZZRTSKs^LZMUgKm^LKYL^kJNZ]K^fJL z{|ybM\]K^TK^LKMbkMNJTZKZ^KZIJKLMRUL^MbKLRSIZy^_ylM\eKN^TZMNZKiRSIZ^_rTZL\}]NLLMgTJZKZ^KnJSRTKZIJKMYYURNMZR^TKYL^NJ]]g 9*62&%<<5&$(%&0)4%/+0*./%/#~#%+05&);#+2&%%&).0+%(5C/%%<4DD+(&5<+04"4:2,:4&%#:$02D4$++(D4D50.&)F '#)%40+(+(7#4$+044((&5+0(7A+044&). m^LKYUMTTJbKJfJTZ]eK]dNIKM]KMK[MLMZI^TeK_MRLK^LKYMLMbJeK^NNdLLRTSK^fJLK^LKTJMLKMKiMRUL^MbKpL^]]RTSKYUJM]JKtUUK^dZKQpiiqKm^L[K QYJNRMUKrfJTZ]KiMRUL^MbKpL^]]RTSK€^ZRtNMZR^TKMTbK]dn[RZKZ^KiRSIZ^_rTZL\}]NLLMgTJZg HIR]KlRUUKMUJLZK^dLKYJLMZR^T]KXJYMLZ[JTZKlI^KlRUUKT^ZR_\KMTbK]U^lKZLMRT]KRTKMbfMTNJK^_KZIJKNL^]]RTSKbdLRTSKZIJK]NIJbdUJbKJfJTZg HIR]K_^L[KR]KT^ZKRTZJTbJbKZ^KnJKd]JbKM]KMKLJudJ]ZK_^LKMNNJ]]K_^LKMT\KN^T]ZLdNZR^TKMNZRfRZRJ]eK]dLfJ\RTSeKY^ZI^URTSeKn^LRTSe JTfRL^T[JTZMUKMTMU\]R]eKtU[RTSeKYI^Z^SLMYI\eK^LK^ZIJLKMNZRfRZRJ]KLJudRLRTSKMKiRSIZy^_yjM\KrTNL^MNI[JTZKMSLJJ[JTZg Lb Lb
‚
CDF
Redlands Regular Meeting of 03-04-2025 843 of 1100



 



   !
"#
$%
&'()
*+(
,
-!
"#
$%
&'()
. 
(
/$+(
 01234 344
35 26789: ;14<

=>???@88A;B:7CDE  E

44

4
<EFDGDH1>FDGDHI@EJ 1 K

F J>JKFJ@
1
E4 E
44E44D F4
GLM 1J 1>H0NMOPQ@>?RR@77:;7ARR?CC3 S<3  <E 
 T14<UL < 4
 3
3
3S3E

D GJQQM
1H0NMOPQ33E13<1<GJQQMVG4 H 1CW< S23>BRB@WB7;CX8AQ4E1P<YD23K

M4<J6U34   

DK   EG4 J
J
52I
Z>1

 S EQ
@ 4SE 41ULQ4E1P<YDD011

  2S
 LET 
2D 
[(+ !, %+(
, E< 5E H32\G4 01

5 +#(]
'()
*+(
,
-+#(]
'()
. Z MEG
 MH32\ G

5 (#
$'()
*+(
,
-(#
$'()
. PQ Q4E;I1;^<J '()
*+(
,
-'()
. 
_`abc_d`a KK
 !
"#
$e(&%(#+
fgh*i",j(,(
i(j

i"

"i
"#
k$kl(&i
"#
k$kl(&k(#+
k$(mkn(
(&kok pqrs(
,(k(#
)
]$.>FRC;RC;7R78@ t!!g!
"#
$e(&%(#+
u*i",j(,(
i(j

i"

"i
"#
k$kl(&i(k
"#
k$kl(&k (#+
k
kpqpvqrs(
,(k(#
)
]$.>
RC;RC;7R78@ t#]
,$f$w#
]u(
&


*i",j(,(
i(j

i"

"i(kk#]
,k$k$kqokqpk pqpvrs(
,(k(#
)
]$.
RC;RC;7R78@ GGT^2K  t

t

sexu,(*tteu.*i",j(,(
i(j

i"

"i

r

srlxr
,()
]$. Q4E1P<PEZ t!!gf+[)vyg"+ $z{
"|{
}]~(]{
"#l(&k!(
,€(]
" *i",j(,(
i(j

i"

"i
"#
k$kl(&i(k$+kkvkookookpqppks,,(j,)
]$.>FRX;CX;7R7X@ t!!gf+[)y/]+
s(
(]g
+

$~
(j
,

&g"+
*i",j(,(
i(j

i"

"i(k$+kk k‚kokpqpƒ)
]$.>FRB;RW;7R7X@ t!!gf+[)„yw+
(&!
"#
k$k%
&g"+
*i",j(,(
i(j

i"

"i(k$+kk„k‚kok pqpƒ)
]$.>FRB;RW;7R7X@ t!!gf+[)
yt

(,%{
!(
,(]
"[
s(
*i",j(,(
i(j

i"

"i
"#
k$kl(&i(k$+k
†

(,k{
kqƒkoqkpqpƒks,,(j,)
]$.>FRX;CX;7R7X@ t!!gf+[)ƒ
y!
,(]!m

+
$


!(
,l(&u

& *i",j(,(
i(j

i"

"i(r$+rrƒ
)
]$. t
"(,(]++

(
(j,z(x|

f+*i",j(,(
i(j

i"

"i(j,k+(x
"km

k$+k{pk pqpƒ)q‚)qo)
]$. Redlands Regular Meeting of 03-04-2025 844 of 1100
Redlands Regular Meeting of 03-04-2025 845 of 1100
City Council Meeting L. 5.

DATE: 03/04/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a $669,000 Public Works Construction Contract with Onyx Paving Company, Inc. for citywide pavement repairs related to utility repairs, a $469,000 additional appropriation, and determination that the project is exempt from environmental review pursuant to Section 15301 of the State's guidelines implementing the California Environmental Quality Act (Municipal Utilities and Engineering Director Harris)
MOTION(S):

If City Council determines the staff recommendation is appropriate, the following motions are provided:

I move that City Council determine approval of a $669,000 Public Works Construction Contract with Onyx Paving Company, Inc. for citywide pavement repairs related to utility repairs is exempt from environmental review pursuant to Section 15301 of the State's guidelines implementing the California Environmental Quality Act; and

1. I move to approve the $469,000 additional appropriation from the Water Fund; and

2. I move to approve the 2025 Citywide Pavement Repair for Water Utilities project specifications, and Public Works Construction Contract with Onyx Paving Company, Inc. in the amount of $669,000.

3. RECOMMENDATION:

Staff recommends City Council determine approval of a $669,000 Public Works Construction Contract with Onyx Paving Company, Inc. is exempt from environmental review pursuant to Section 15301 of the State's guidelines implementing the California Environmental Quality Act. Staff further recommends City Council approval of the 2025 Citywide Pavement Repair for Water Utilities Project specifications, approval of a $469,000 additional Redlands Regular Meeting of 03-04-2025 846 of 1100
appropriation from the Water Fund, and approval of a $669,000 Public Works Construction Contract with Onyx Paving Company, Inc.

DISCUSSION:

Annually, MUED staff repairs approximately 250 broken water mains, services, valves, blow-offs, and other water utility infrastructure within the Redlands water service area that require asphalt removal and trenching. After each repair, these trenches are covered with temporary asphalt until hot mix asphalt material is available for permanent patching. This permanent asphalt patching has historically been completed by a contractor hired by MUED and services were only provided when requested by MUED staff. The 2025 Citywide Pavement Repair for Water Utilities (Project) was developed to provide clear, concise Project specifications and quantities for prospective bidders to complete all permanent asphalt patching services with a single project.

A Project Bid Notice was issued in December 2024, and bids were received from the following contractors before the January 14, 2025 submittal deadline:

BID OPENING REPORT SUMMARY
Bidder Bid Amount

1. Onyx Paving Company, Inc. Anaheim, CA $669,000

2. Gentry General Engineering, Inc., Colton, CA $736,920

3. Hardy & Harper, Inc., Lake Forest, CA $1,329,750
MUED staff determined that Onyx Paving Company, Inc. submitted the lowest responsive and responsible Project bid. Staff recommends City Council approval of a $669,000 Public Works Construction Contract with Onyx Paving Company, Inc. to complete this project. It is anticipated that the Project will be completed within 240 working days after a Notice To Proceed is issued.

This project is exempt from environmental review in accordance with Section 15301 of the State's guidelines implementing the California Environmental Quality Act since the Project involves maintenance of existing streets, without expanding use.

ALTERNATIVES:

City Council may deny the staff recommendation and provide alternate direction.

STRATEGIC PLAN:

N/A
Redlands Regular Meeting of 03-04-2025 847 of 1100
SUBMITTED BY:

John R. Harris, Municipal Utilities and Engineering Director RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Dana Abramovitz-Daniel, Procurement Manager
PREPARED BY:

Goutam K. Dobey, City Engineer
Fiscal Impact
Fiscal Year: FY 24/25
Appropriation Required Y/N: Yes
Amount: $469,000
Budgeted Y/N: Yes
Account No.: 501900-7207
Discussion:

The FY 24/25 and FY 25/26 MUED budgets each include $200,000, for a total of $400,000, for this project. Additionally, the Project scope of work expanded after approval of the bi-annual MUED budget, requiring an additional $269,000 to complete all Project tasks. In order to issue a purchase order for the total Project cost in FY 24/25, the total Project cost must be appropriated in the current FY. Therefore, MUED staff recommends City Council approval of a $469,000 additional appropriation from the Water Fund (501).

Attachments
A. Onyx Paving Public Work Contract
B. Bid Opening Report
C. Bid Analysis
D. Project Specifications
Additional Appropriation Form
Redlands Regular Meeting of 03-04-2025 848 of 1100
1 I:\cmo\Agreements\Onyx_Paving_Public_Work_Contract FY25-0034.doc-jm

PUBLIC WORK CONSTRUCTION CONTRACT
This Public Work Construction contract (“Contract”) is made and entered into this 4 th day of March,
2025, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and Onyx Paving Company, Inc. (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
In consideration of the mutual promises contained herein, City and Contractor agree as follows:

1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: 2025 Citywide Pavement Repair for Water Utilities, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s 2025 Citywide Pavement Repair for Water Utilities, Project No. 20250114 (the “Work”).

2. CONTRACT SUM: City shall pay Contractor the sum of six hundred sixty-nine thousand dollars ($669,000) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.

3. TIME FOR COMPLETION: The Work shall be completed within two hundred forty (240) working day(s) as defined in Section 1-2 of the Standard Specifications for Public Works Construction “Greenbook” from and after the date of City’s issuance of a Notice to Proceed to Contractor.

4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars/cents ($500) for each working day as defined in Section 1-2 of the Standard Specifications for Public Works Construction “Greenbook” in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.

5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).

6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.

7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy five thousand dollars ($375,000) or less shall be made by Contractor and Redlands Regular Meeting of 03-04-2025 849 of 1100
2 I:\cmo\Agreements\Onyx_Paving_Public_Work_Contract FY25-0034.doc-jm processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public Contract Code (commencing with Section 20104). All claims shall be in writing and include the documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.

8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.

9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.

10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.

11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor.

Redlands Regular Meeting of 03-04-2025 850 of 1100
3 I:\cmo\Agreements\Onyx_Paving_Public_Work_Contract FY25-0034.doc-jm IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.

CITY OF REDLANDS
(SEAL)
By:____________________________________
Mario Saucedo, Mayor
ATTEST:
____________________________________
Jeanne Donaldson, City Clerk
(SEAL)
Onyx Paving Company, Inc.___________________
Name of Contractor
By:_______________________________________
Signature of Authorized Agent
__________________________________________
Title
__________________________________________
Signature of Authorized Agent (if necessary)
__________________________________________
Title
__________________________________________
Contractor's License No.

Redlands Regular Meeting of 03-04-2025 851 of 1100
4 I:\cmo\Agreements\Onyx_Paving_Public_Work_Contract FY25-0034.doc-jm

WORKER'S COMPENSATION INSURANCE CERTIFICATION
Description of Contract: City of Redlands
Municipal Utilities and Engineering Department
2025 Citywide Pavement Repair for Water Utilities
Project No. 20250114
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to selfinsure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

Dated this day of , 2025.
_____________________________________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)
(SEAL)
(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.)
Redlands Regular Meeting of 03-04-2025 852 of 1100
5 I:\cmo\Agreements\Onyx_Paving_Public_Work_Contract FY25-0034.doc-jm

FAITHFUL PERFORMANCE BOND
Whereas, the City of Redlands (“City”), State of California, and Onyx Paving Company, Inc. (hereinafter designated as "Principal") have entered into an agreement dated March 4, 2025 (“Agreement”) whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as 2025 Citywide Pavement Repair for Water Utilities and is hereby referred to and made a part hereof; and
Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of six hundred sixty-nine thousand dollars ($669,000) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.

As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.

Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:

1. Complete the Work in accordance with its terms and conditions; or

2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, but not exceeding, including other costs and damages for which Surety may be liable hereunder, the Redlands Regular Meeting of 03-04-2025 853 of 1100
6 I:\cmo\Agreements\Onyx_Paving_Public_Work_Contract FY25-0034.doc-jm amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.

Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.

No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.

The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.

In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2025.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:___________________________________
__________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone ( )___________________________
Redlands Regular Meeting of 03-04-2025 854 of 1100
7 I:\cmo\Agreements\Onyx_Paving_Public_Work_Contract FY25-0034.doc-jm

LABOR AND MATERIAL BOND
Whereas, the City Council of the City of Redlands, State of California, and Onyx Paving Company, Inc. (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated March 4,, 2025, and identified as 2025 Citywide Pavement Repair for Water Utilities is hereby referred to and made a part hereof; and Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of six hundred sixty-nine thousand dollars ($669,000) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2025.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of Surety) ____________________________________ Telephone: ( )___________________
Redlands Regular Meeting of 03-04-2025 855 of 1100
Redlands Regular Meeting of 03-04-2025 856 of 1100
ATTACHMENT "C"
PROJECT NO. 20250114 BID DATE: 1/14/2025
2025 Citywide Pavement Repair For Water Utilities START DATE: 3/10/2025 Unit Price Item Price Unit Price Item Price Unit Price Item Price 1 Sawcut Remove & Replace Asphalt SF 15,000 $ 28.00 $ 420,000.00 $ 27.00 $ 405,000.00 $ 34.00 $ 510,000.00 2 Grind & Overlay SF 30,000 $ 5.55 $ 166,500.00 $ 8.00 $ 240,000.00 $ 25.00 $ 750,000.00 3 Remove Existing Temporary Material SF 1,000 $ 44.00 $ 44,000.00 $ 31.00 $ 31,000.00 $ 37.00 $ 37,000.00 4 Replace Pavement Striping in Kind LF 1,000 $ 9.39 $ 9,390.00 $ 16.00 $ 16,000.00 $ 5.00 $ 5,000.00 5 Replace Thermoplastic Pavement Markings EA 10 $ 1,700.00 $ 17,000.00 $ 1,050.00 $ 10,500.00 $ 600.00 $ 6,000.00 6 Replace Traffic Loops EA 10 $ 1,111.00 $ 11,110.00 $ 3,400.00 $ 34,000.00 $ 725.00 $ 7,250.00 7 Replace Pavement Markers EA 20 $ 50.00 $ 1,000.00 $ 21.00 $ 420.00 $ 725.00 $ 14,500.00 Total Bid Price $ 669,000.00 $ 736,920.00 $ 1,329,750.00

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT

BID ANALYSIS
Item
No. Bid Item Quantity Unit Onyx Paving Company, Inc. Gentry General Engineering, Inc. Hardy & Harper, Inc Low Bidder #1, #2 and #3
Redlands Regular Meeting of 03-04-2025 857 of 1100

CITY OF REDLANDS

MUNICIPAL UTILITIES &

ENGINEERING DEPARTMENT
Bid Proposal, Contract Documents and Specifications
For
2025 CITYWIDE PAVEMENT REPAIR FOR WATER UTILITIES
Project No. 20250114
DECEMBER 2024
Redlands Regular Meeting of 03-04-2025 858 of 1100
Redlands Regular Meeting of 03-04-2025 859 of 1100

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT
Bid Proposal, Contract Documents and Specifications
for
2025 CITYWIDE PAVEMENT REPAIR FOR WATER UTILITIES
Project No. 20250114
For use in conjunction with specifications entitled: “Standard Specifications for Public Works Construction (Greenbook)” 2021 Edition; “Standard Plans for Public Works Construction” 2021 Edition; Municipal Utilities and Engineering Department’s Water Systems Standard Specifications and Sanitary Sewer System Standard Specifications, latest editions; and General Permit Conditions and Trench Specifications.

City Council:

Eddie Tejeda, Mayor
Paul T. Barich, Mayor Pro Tem
Denise Davis, Councilmember
Jenna Guzman-Lowery, Councilmember
Mario Saucedo, Councilmember
City Clerk:

Jeanne Donaldson, City Clerk
City Staff:

Charles M. Duggan Jr., City Manager
DECEMBER 2024
Redlands Regular Meeting of 03-04-2025 860 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 861 of 1100
TOC 1
2025 CITYWIDE PAVEMENT REPAIR FOR WATER UTILITIES
Project No. 20250114

TABLE OF CONTENTS
(XX) REFLECTS PAGE IDENTIFICATION FOOTER ABBREVIATION

NOTICE INVITING SEALED PROPOSALS (NIB)

BID DOCUMENTS (BD)
INSTRUCTIONS TO BIDDERS.......................................................................................... 1 PROPOSAL ...................................................................................................................... 10 BID CERTIFICATION........................................................................................................ 13 BID BOND ...................................................................................................................... 14 NON-COLLUSION AFFIDAVIT ...................................................................................... 15 STATEMENT BY BIDDER............................................................................................... 16 OFFICERS OF CORPORATION (Members of Firm)....................................................... 16 SUB-CONTRACTORS LIST............................................................................................. 17 QUALIFICATION AND EXPERIENCE STATEMENT.................................................. 18 GENERAL INFORMATION ............................................................................................. 19

CONTRACT DOCUMENTS (CD)
PUBLIC WORKS CONSTRUCTION CONTRACT........................................................... 1

GENERAL CONDITIONS (GC)
SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS...................................................................... 1 SECTION 2 - SCOPE OF THE WORK ............................................................................... 2 SECTION 3 - CONTROL OF THE WORK......................................................................... 3 SECTION 4 - CONTROL OF MATERIALS....................................................................... 7 SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITES ...................................... 8 SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK .............................. 30 SECTION 7 - MEASUREMENT AND PAYMENT ......................................................... 32 SECTION 8 - FACILITIES FOR AGENCY PERSONNEL.............................................. 33 SECTION 9 - ASSIGNMENT OF UNFAIR BUSINESS PRACTICES CLAIMS ........... 33 SECTION 10 - TRENCHING AND EXCAVATION........................................................ 34 SECTION 11 - REMOVAL, RELOCATION OR PROTECTION OF EXISTING UTILITIES................................................................................................... 34 SECTION 200 - ROCK MATERIALS............................................................................... 35 SECTION 201 - CONCRETE, MORTAR AND RELATED MATERIALS..................... 36 SECTION 203 - BITUMINOUS MATERIALS................................................................. 36 SECTION 206 - MISCELLANEOUS METAL ITEMS..................................................... 38 Redlands Regular Meeting of 03-04-2025 862 of 1100
TOC 2
SECTION 207 – GRAVITY PIPE...................................................................................... 38 SECTION 211 - MATERIAL TESTS ................................................................................ 38 SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS ........................................................................... 39 SECTION 300 - EARTHWORK ........................................................................................ 39 SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND PLACEMENT OF BASE MATERIALS ............................................................................. 43 SECTION 302 - ROADWAY SURFACING ..................................................................... 49 SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION .............................. 58 SECTION 304 - METAL FABRICATION AND CONSTRUCTION .............................. 62 SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS........... 62

GENERAL REQUIREMENTS
SECTION 01110 COORDINATION OF WORK
SECTION 01112 DESCRIPTION OF WORK
SECTION 01200 MEASUREMENT AND PAYMENT
SECTION 01251 CHANGE ORDER REQUESTS
SECTION 01254 CHANGE ORDERS
SECTION 01321 CONSTRUCTION SCHEDULE
SECTION 01322 CONSTRUCTION PROGRESS PHOTOGRAPHY
SECTION 01323 CONSTRUCTION STATUS REPORTS
SECTION 01330 SUBMITTALS
SECTION 01572 EROSION CONTROL PLAN
SECTION 01721 MOBILIZATION
SECTION 01732 POTHOLING
SECTION 01740 DEMOBILIZATION

TECHNICAL SPECIFICATIONS
SECTION 02222 PROTECTING EXISTING UNDERGROUND UTILITIES

APPENDIX

APPENDIX A CHECKLIST OF LABOR LAW REQUIREMENTS

APPENDIX B CITY OF REDLANDS WORKDAY CONSTRUCTION AND

SCHOOL SCHEDULE

APPENDIX C CITY OF REDLANDS PERMITS

APPENDIX D CITY OF REDLANDS MUED GENERAL PERMIT CONDITIONS

AND TRENCH SPECIFICATIONS

APPENDIX E CITY OF REDLANDS CONTRACTOR SAFETY PROGRAM

APPENDIX F LIST OF EXISTING TEMPORARY PATCHES (TO BE PROVIDED) Redlands Regular Meeting of 03-04-2025 863 of 1100
Redlands Regular Meeting of 03-04-2025 864 of 1100
Redlands Regular Meeting of 03-04-2025 865 of 1100

BID DOCUMENTS
(BD)
Redlands Regular Meeting of 03-04-2025 866 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 867 of 1100
BD 1

INSTRUCTIONS TO BIDDERS
For
2025 CITYWIDE PAVEMENT REPAIR FOR WATER UTILITIES
Project No. 20250114
Bids to receive consideration shall be made in accordance with the following instructions:

1. PROPOSALS:
a. Bids shall be made upon the form of proposal furnished by the City. All Bids shall be properly executed with all items filled in; the signatures of all persons signing shall be in longhand. If the unit price and the total amount named by a Bidder for any item are not in agreement, the unit price shall be considered as representing the Bidder's intention, and the totals may be corrected by the Engineer to conform thereto. If the sum of the individual bid item’s and the total amount named by a Bidder are not in agreement, the sum of the bid item’s shall be considered as representing the Bidder’s intention, and the totals may be corrected by the Engineer to conform thereto. If the total price written in words and the total price written in figures are not in agreement, then the total price written in words will be considered as representing the Bidder’s intention, and the totals will be corrected by the Engineer to conform thereto.
b. Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete Bids, erasures, or irregularities of any kind.

Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the Bidder.
c. Bids shall be accompanied by a cashier's or a certified check or Bidder's admitted corporate surety bond, in an amount not less than ten percent (10%) of the bid, made payable to the City of Redlands. Said check or bond shall be given as a guarantee that the Bidder will enter into a contract if awarded the work. In the case of refusal or failure to enter into said Contract, within fourteen (14) days after Notice of Award by the City in writing, the security shall be applied by the City to the difference between such bid and next lowest acceptable bid and surplus, if any, shall be returned to Bidder if cash or check is used, or to Surety if bid bond is used.
d. Before submitting a bid, Bidders shall carefully examine the Plans; read the Specifications; read all other Contract documents; shall visit the site of the work; shall fully inform themselves as to all existing conditions and limitations; and include in the bid a sum to cover the cost of all items included in the Contract. No allowance will be made due to lack of examination or knowledge. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered as to character, quality and scope of work to be performed; the quantities of materials to be furnished; and as to the requirements of the Bid Proposal, plans and specifications.

Redlands Regular Meeting of 03-04-2025 868 of 1100
BD 2
e. Pursuant to CA Labor Code Section 1770 et seq., the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are available at http://www.dir.ca.gov/OPRL/PWD/. Copies of the prevailing wage determination are also on file at the City of Redlands and shall be made available to any interested party upon request.
f. The bid must be submitted on or before the date and time specified in the Notice Inviting Sealed Proposals (Bids). The bid shall be submitted in a sealed envelope marked in the lower left corner as follows:

BID FOR: 2025 CITYWIDE PAVEMENT REPAIR

FOR WATER UTILITIES,
Project No. 20250114
g. Bids will be opened and publicly read aloud at the time set in the Notice Inviting Sealed Proposals (Bids), in the Office of the City Clerk, Civic Center, 35 Cajon Street, Suite 4, Redlands, California.

2. AGREEMENT AND BONDS:

The form of Contract which the successful Bidder, as Contractor, will be required to execute is included in the Contract Documents (CD) of these specifications and should be carefully examined by the Bidder. The Agreement, admitted Corporate Surety Bonds and other documents to be executed by the Contractor shall be executed in original-duplicates stamped according to law, one of which original-duplicates shall be filed with the City Clerk of the City of Redlands. The successful Bidder, simultaneously with the execution of the Agreement, will be required to furnish a faithful performance bond and a labor and material bond, each in an amount equal to one hundred percent (100%) of the Contract price. Said bonds shall provide that if the Contractor or their Subcontractor fails to pay for any materials, provision, provender or other supplies or items used in, upon, for or about the performance of the work contracted to be done, or for any work of labor thereon of any kind, or for amounts due under the Unemployment Insurance Act or Workman's Compensation, with respect to such work or labor, that the surety or sureties will pay for the same. The amount shall not exceed the sum specified in the bond, and also, in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the court. All bonds shall be secured from surety companies satisfactory to the City of Redlands and whose name is on file with the County Clerk of San Bernardino County, as an approved and financially sound surety company authorized to transact business in this state.

3. WITHDRAWAL OF BIDS:
a. Any Bidder may withdraw his Bid, only by written request, at any time prior to the scheduled time for Bid Opening.
b. No Bidder may withdraw his Bid for a period of sixty (60) days after the time of Bid Opening except as allowed by the California Public Contract Code.

Redlands Regular Meeting of 03-04-2025 869 of 1100
BD 3

4. INSURANCE AND HOLD HARMLESS REQUIREMENTS:

Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract. Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non-contributing to any insurance or self-insurance maintained by the City. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective.

The coverage shall provide the following minimum limits based on the type of work proposed under this Contract. The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Insurance Requirements as follows:

CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits
and Conduit Construction
(streets)
Grading of Land Street Cleaning
Caisson or Cofferdam Work Hazardous Materials
Contractors Street or Road Construction
Dam or Reservoir Construction Irrigation or Drainage
Construction
Tank Construction, Installation,
Erection or Repair
Demolition (structures) Landscape Construction (street
or street medians)
Telephone or Cable Line
Construction
Drilling Painting (exterior greater than
single story)
Tree Pruning, Dusting,
Spraying or Removal
Redlands Regular Meeting of 03-04-2025 870 of 1100
BD 4
TIER 1 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission ➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Commercial Umbrella/ Excess Liability
➢ $5 Million Per Occurrence/ Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission e. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
Redlands Regular Meeting of 03-04-2025 871 of 1100
BD 5
TIER 2 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission ➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC)
Systems (service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair) Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors Redlands Regular Meeting of 03-04-2025 872 of 1100
BD 6
Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.

Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements from each subcontractor.

The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.

The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given. The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and the City.

Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.

5. LICENSES AND PERMITS:

No bid will be accepted from a Contractor who is not licensed in accordance with the law under the provisions of Division III, Chapter 9 of the Business and Professions Code of the State of California.

The Contractor shall, at the time of bid opening, possess a valid "Class A" or "Class C-12" Contractor's license, and provide its California State Contractor’s License number to the City.

All subcontractors listed at the time of bid opening shall possess a valid Contractor’s license for the work in which they are specified to complete within the Bid Submittal Package.

The Contractor shall, prior to Notice to Proceed, procure all other permits and licenses as stipulated in the GENERAL CONDITIONS.

Redlands Regular Meeting of 03-04-2025 873 of 1100
BD 7
In addition, no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015 or awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

Contractors shall submit proof of registration status with their bid submission to the City of Redlands. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

6. SUBSTITUTION OF SECURITIES:

In accordance with applicable provisions of State law, the Contractor will be permitted to substitute qualified securities in lieu of retention of withheld progress payments by the Owner.

7. SUBCONTRACTORS:

Pursuant to Section 4105 of the California Public Contract Code, the bidder may not circumvent the requirement to list subcontractors by the device of listing one subcontractor, who in turn sublets portions constituting a majority of the work covered by the contract.

A. Pursuant to California Government Code section 4106, subcontractors who will perform work or labor or render services in an amount in excess of one-half of one percent of the Contractor’s total bid shall be set forth in a list of subcontractors within the bid documents. Such list shall be accompanied by an experienced statement with pertinent information regarding similar projects and other evidence of qualifications for each such subcontractor, supplier, individual, or entity if requested by City. If City or engineer, after doing an investigation, has reasonable objection to any proposed subcontractor, supplier, individual, or entity, City may, before the notice of award is given, request the apparent successful bidder to submit a substitute, without an increase in the bid.

B. If the apparent successful bidder declines to make any such substitution, City may award the contract to the next lowest bidder that proposes to use acceptable subcontractors, suppliers, individuals, or entities declining to make the request and substitutions will not constitute grounds for forfeiture of the bid security of any bidder. Any subcontractor, supplier, individual or entity so listed and against which City makes no written objection prior to the giving of the notice of award will be deemed acceptable by City subject to verification of such assessments after the effective date of the agreement as provided herein.

8. NON DEBARRED CONTRACTORS AND SUBCONTRACTORS
The Contractor and all of its subcontractors shall, at the time of bid opening and for performance of this public works contract, be non-debarred contractors and not be ineligible Contractors pursuant to Public Contract Code section 6109 and Labor Code sections 1777.1 and 1777.7.

Redlands Regular Meeting of 03-04-2025 874 of 1100
BD 8

9. LABOR LAW REQUIREMENTS
Prior to the start of construction, the Contractor and each subcontractor shall submit to the City an executed Checklist of Labor Law Requirements, included within Appendix A, certifying that each Contractor and Subcontractor will comply with the foregoing Labor Law requirements; and fully understands that failure to comply with these requirements will subject it to the penalties cited herein.

By submitting a bid, the prime contractor and subcontractors involved in this project assure that they intend to comply with the labor law requirements noted within Appendix A, fully understanding that failure to comply may subject them to penalties as noted.

10. BID PROTEST PROCEDURES
Any bid protest must be in writing and received by the City Clerk’s Office at 35 Cajon Street, Suite 4, Redlands, CA 92373, before 5:00 p.m. no later than two working days following the bid opening (the “Bid Protest Deadline”) and must comply with the following requirements:

10.1 General. Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. If required by City, the protesting bidder must submit a nonrefundable fee in the amount specified by City, based upon City’s reasonable costs to administer the bid protest. Any such fee must be submitted to City no later than the Bid Protest Deadline, unless otherwise specified. For purposes of this Section, a “working day” means a day that City is open for normal business, and excludes weekends and holidays as observed by the City.

10.2 Protest Contents. The bid protest must contain a complete statement of the basis for the protest and all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the person representing the protesting bidder if different from the protesting bidder.

10.3 Copy to Protested Bidder. A copy of the protest and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protested bidder and any other bidder who has a reasonable prospect of receiving an award depending on the outcome of the protest.

10.4 Response to Protest. The protested bidder may submit a written response to the protest, provided the response is received by the City Clerk’s Office before 5:00 p.m., within two working days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must include all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person representing the protested bidder if different from the protested bidder.

Redlands Regular Meeting of 03-04-2025 875 of 1100
BD 9

10.5 Copy of Protesting Bidder. A copy of the response and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protesting bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.

10.6 Exclusive Remedy. The procedure and time limits set forth in this section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.

10.7 Right to Award. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a notice to proceed with the Contract notwithstanding any pending or continuing challenge to its determination.

Redlands Regular Meeting of 03-04-2025 876 of 1100
BD 10

PROPOSAL
TO: THE CITY OF REDLANDS, SAN BERNARDINO COUNTY, CALIFORNIA herein called the “City”.

Pursuant to and in compliance with your Notice Inviting Bids, and the other documents relating thereto, the undersigned Bidder, having familiarized themselves with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the work at the place where the work is to be done, and with the plans thereto, hereby proposes and agrees to perform within the time stipulated, the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, equipment and all utility and transportation services necessary to perform the contract, and complete in a workmanlike manner, all of the work covered by the contract in connection with the City’s Project identified as 2025 CITYWIDE PAVEMENT REPAIR FOR WATER UTILITIES
Project No. 20250114
NOTE: Bidders must bid each item in this schedule. All entries in the entire PROPOSAL must be made clearly and in ink. Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the Bidder. This project is intended to provide full work days of operation, at least 15 patches a week. Once list of repair works is provided to the Contractor, Contractor will have 30 calendar days to complete the work. The anticipated duration of the contract is 730 calendar days.

BID SCHEDULE
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated Quantity
Unit Price
(If Applicable) Total Price in Figures
1 Sawcut & Remove Temporary
Asphalt & Replace with
Conventional Asphalt per City
of Redlands Surface Restoration
& Trench Backfill Detail
15,000 SF $_________/SF $______________________
2 Grind & Overlay 0.10 ft. min. &
Replace with Conventional
Asphalt per City of Redlands
Surface Restoration & Trench
Backfill Detail
30,000 SF $_________/SF $______________________
3 Remove Existing Temporary
Material and Place 4-inch Depth
PCC (560-C-3250) on
compacted base
1,000 SF $_________/SF $______________________
Redlands Regular Meeting of 03-04-2025 877 of 1100
BD 11

BID SCHEDULE CONTINUED
(See “Section 01200 – Measurement and Payment” for Bid Item description) 4 Replace Pavement Striping in
Kind (paint/Thermoplastic) 1,000 LF $_________/LF $______________________ 5 Replace Thermoplastic
Pavement Markings (Legends,
Arrows, etc.)
10 EA $_________/EA $______________________
6 Replace Traffic Loops 10 EA $_________/EA $______________________ 7 Replace Pavement Markers 20 EA $_________/EA $______________________ BID SCHEDULE TOTAL PRICE (1-7) $______________________
Note: Quantities stated above in the Bid Schedule table are estimates only and are not guaranteed. Bid unit price on the estimated quantity and unit of measure specified. The City may order more or less than the estimated quantity indicated on Bid Schedule price sheet.

Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ BID SCHEDULE TOTAL PRICE: $_______________________________________________________ BID SCHEDULE TOTAL PRICE WRITTEN IN WORDS: ________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ * Provision is made here for the Bidder to include an addition or deduction in its bid, if it wishes, to reflect any last-minute adjustments in prices. The addition or deduction, if made, will be proportionately applied to the Progress Payments total for the respective item in the Schedule of Prices, the amount being added or deducted for each monthly payment. The unit prices entered in the Schedule of Prices will not be affected.

LOW BID DETERMINATION:

The low bid will be determined pursuant to Public Contract Code Section 20103.8 as the lowest bid price on the Bid Schedule Total Price on page BD 11. A responsible bidder who submits the lowest bid as determined by the above method shall be awarded the contract, if it is awarded, by the City Council of the City of Redlands.

Redlands Regular Meeting of 03-04-2025 878 of 1100
BD 12

ADDENDA
Receipt of the following addenda is hereby acknowledged and the same is included in the Bid Price:

Addendum #1___________ Addendum #2___________ Addendum #3____________ (initials) (initials) (initials)
Addendum #4___________ Addendum #5___________ Addendum #6____________ (initials) (initials) (initials)
ATTEST: (if Corporation)
(Corporation Seal)
___________________________________ _____________________________________ Company Name Signature
____________________________________ _____________________________________ Address Name
____________________________________ _____________________________________ City, State, Zip Title
Redlands Regular Meeting of 03-04-2025 879 of 1100
BD 13

BID CERTIFICATION
The undersigned certifies that they are familiar with the various State and local laws affecting labor, length of working days, employer's liabilities, Sunday work, alien labor, domestic materials, Subcontractors, etc.

It is understood and agreed that the work under the contract will be commenced by the undersigned Bidder, if awarded the contract, within ten (10) calendar days from the date in the Notice to Proceed and will be completed by the Contractor in the time set forth in the CONTRACT.

Enclosed find Bidders bond or certified or cashier's check No. _________________ on the __________________________________ Bank, in the amount of ______________________ _______________________ which is not less than ten percent (10%) of the Bid submitted by the undersigned, made payable to the City of Redlands, California and which is given as a guarantee that the Bidder agrees that in case of their default in executing said contract with necessary bonds, the bond or check accompanying this Bid and the money made payable shall become and remain the property of the City of Redlands.

It is understood and agreed that the City of Redlands has the right to waive defects or irregularities and to accept or reject any or all Bids. No Bidder may withdraw their Bid for a period of sixty (60) days after the time of the Bid Opening except as allowed by the California Public Contract Code.

The following information, required by State law under penalty of perjury, is true and correct. Failure to complete this information renders the bid non-responsive, and the bid must be rejected. ____________________________________ _______________________________________ Company Name Signature
____________________________________ _______________________________________ Address Signatory's Title
____________________________________ _______________________________________ City, State, Zip State License Number and Class
____________________________________ _______________________________________ Telephone Number License Expiration Date
Dated this ________________ day of ___________________, 20___.

Redlands Regular Meeting of 03-04-2025 880 of 1100
BD 14

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,
That ______________________________________________________________ as Principal, and ______________________________________ as Surety, are held and firmly bound unto the City of Redlands, hereinafter called City, in the sum of ______________________________________ dollars, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has submitted a bid to said City to perform all work required under the Project No. 20250114.

NOW, THEREFORE, if said Principal is awarded a contract by said City and, within the time and in the manner required under the heading "Instructions to Bidders" bound with said Specifications, enters into a written contract on the form of agreement bound with said Specifications and furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials; then this obligations shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by said City and Judgment is recovered, said Surety shall pay all costs incurred by said City in such suit, including a reasonable attorney's fee to be fixed by the court.

SIGNED AND SEALED, this _________ day of _____________________________, 20____. ______________________________(SEAL) _______________________________(SEAL) (Principal) (Surety)
By:_________________________________ By:__________________________________ (Signature) (Signature)
Address:______________________________
_____________________________________
Telephone (___)________________________
(Seal and Notarial Acknowledgment of Surety)
Redlands Regular Meeting of 03-04-2025 881 of 1100
BD 15

STATEMENT BY BIDDER

NON-COLLUSION AFFIDAVIT

STATE OF )
) ss

COUNTY OF )
, being first duly sworn, deposes and says that

he is
(Sole Owner, a Partner, President, Secretary, etc.)
of
(Contractor)
the party making the foregoing bid on Project No. 20250114 that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or of any other Bidder or to fix any overhead, profit, or cost element of the bid price or of that of another bidder, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed contract; that all statements contained in such bid are true; and further, that the Bidder has not directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company, association organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

By: ______________________________ Title: ________________________________ Subscribed and sworn to before me this day of __________________________, 20 .

Signature of Officer Administering Oath
(Notary Public)
Redlands Regular Meeting of 03-04-2025 882 of 1100
BD 16

STATEMENT BY BIDDER
OFFICERS OF CORPORATION (Members of Firm)
The names of all persons interested in the foregoing proposals as principals, are as follows:
(IMPORTANT NOTICE - if Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer and manager thereof; if a co-partnership, state true name of firm, also names of all individual co-partners composing firm; if Bidder or other interested person is an individual, state first and last names in full). _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ Licensed in accordance with an act providing for the Registration of Contractors, License No. ______________________________________.

Signature of Bidder Dated
NOTE: If Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer(s) authorized to sign contracts on behalf of the corporation; if Bidder is a co-partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners authorized to sign contracts in behalf of the co-partnership, and if the Bidder is an individual, that signature shall be placed above.

Redlands Regular Meeting of 03-04-2025 883 of 1100
BD 17

STATEMENT BY BIDDER

SUB-CONTRACTORS LIST
Bidder supplies the following information for any Subcontractor who will perform work or labor or render services to the prime contractor, etc. to be used on Project No. 20250114, all in accordance with Section 4104 of the California Public Contract Code.

LICENSED SUBCONTRACTOR’S NAME

AND BUSINESS ADDRESS
LICENSE #

SPECIFIC

DESCRIPTION

OF SUBCONTRACT
& BID ITEM #
% OF BID

ITEM TO BE

PERFORMED
Redlands Regular Meeting of 03-04-2025 884 of 1100
BD 18

STATEMENT BY BIDDER

QUALIFICATION AND EXPERIENCE STATEMENT
The following outline is a record of the undersigned Bidder's experience in construction of three (3) projects of a type similar in magnitude and character to that contemplated under Project No. 20250114 within the past two years. Include the location of each project as well as the name, address, and phone number of the owner, and name of individual to contact.

Subcontractors performing in excess of one half of one percent of the prime Contractor’s total bid, or in the construction of streets or highways, one half of one percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater shall provide a similar outline.

Additional pages outlining this portion of the Bid may be attached. Failure to provide this statement may result in rejection of the bid by the City of Redlands.

1. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Project Description:

Amount of Contract: Completion Date:

2. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Project Description:

Amount of Contract: Completion Date:

3. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Project Description:

Amount of Contract: Completion Date:

Redlands Regular Meeting of 03-04-2025 885 of 1100
BD 19

STATEMENT BY BIDDER

GENERAL INFORMATION

1. Bidder's Mailing Address

2. Number of years engaged in the contracting business under your present firm or trade name:

3. Have you ever failed to complete any work awarded to you? (Yes or No) . If yes, provide details in the space provided in Item 10.

4. Have you ever defaulted on a contract? (Yes or No) . If yes, provide details in the space provided in Item 10.

5. Have you ever been a party to a lawsuit or gone to arbitration during the last 5 years? (Yes or No) . If yes, provide details in the space provided in Item 10.

6. Has any Stop Notice been filed against you during the last 5 years? (Yes or No) . If yes, provide details in the space provided in Item 10.

7. Has your contractor's license ever been suspended, revoked, or subject to disciplinary action? (Yes or No) . If yes, provide details in the space provided in Item 10.

8. Contracts currently on hand:

Agency Name Amount of Contract Start Date Completion Date

9. Enter the name of person(s) who inspected the site of the proposed work for your firm and the date of said site inspection.

Name: Date:

Redlands Regular Meeting of 03-04-2025 886 of 1100
BD 20

10. In the space provided, the Bidder shall provide details concerning any "Yes" answers provided in this "General Information" section. Details shall include, but not be limited to, the nature of dispute, name of the agency involved and the final outcome. If requested by the City, the Bidder shall supply additional information, sufficiently detailed, to permit evaluation of the Bidder's ability to perform the work.

Question
Number Details
Redlands Regular Meeting of 03-04-2025 887 of 1100

CONTRACT DOCUMENTS
(CD)
Redlands Regular Meeting of 03-04-2025 888 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 889 of 1100
\\FILES\Engineering\Capital Projects\501900 WATER FUND AND PROJECTS\2025 Citywide Pavement Repair\7 BID AND AWARDS_PRECONSTRUCTION\7-6 CONTRACT AWARD_NTP\Public Work Contract.PW-3.1(Work Days).doc

PUBLIC WORK CONSTRUCTION CONTRACT
This Public Work Construction contract (“Contract”) is made and entered into this ___ day of ____________, 20__, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and __________________ (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
In consideration of the mutual promises contained herein, City and Contractor agree as follows:

1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: 2025 Citywide Pavement Repair for Water Utilities, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s 2025 Citywide Pavement Repair for Water Utilities, Project No. 20250114 (the “Work”).

2. CONTRACT SUM: City shall pay Contractor the sum of ___________________ dollars ($___________) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.

3. TIME FOR COMPLETION: The Work shall be completed within two hundred forty (240) working day(s) as defined in Section 1-2 of the Standard Specifications for Public Works Construction “Greenbook” from and after the date of City’s issuance of a Notice to Proceed to Contractor.

4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars/cents ($500) for each working day as defined in Section 1-2 of the Standard Specifications for Public Works Construction “Greenbook” in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.

5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).

6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.

7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy five thousand dollars ($375,000) or less shall be made by Contractor and Redlands Regular Meeting of 03-04-2025 890 of 1100
\\FILES\Engineering\Capital Projects\501900 WATER FUND AND PROJECTS\2025 Citywide Pavement Repair\7 BID AND AWARDS_PRECONSTRUCTION\7-6 CONTRACT AWARD_NTP\Public Work Contract.PW-3.1(Work Days).doc processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public Contract Code (commencing with Section 20104). All claims shall be in writing and include the documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.

8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.

9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.

10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.

11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor.

Redlands Regular Meeting of 03-04-2025 891 of 1100
\\FILES\Engineering\Capital Projects\501900 WATER FUND AND PROJECTS\2025 Citywide Pavement Repair\7 BID AND AWARDS_PRECONSTRUCTION\7-6 CONTRACT AWARD_NTP\Public Work Contract.PW-3.1(Work Days).doc IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.

CITY OF REDLANDS
(SEAL)
By:____________________________________
Eddie Tejeda, Mayor
ATTEST:
____________________________________
Jeanne Donaldson, City Clerk
(SEAL)
__________________________________________
Name of Contractor
By:_______________________________________
Signature of Authorized Agent
__________________________________________
Title
__________________________________________
Signature of Authorized Agent (if necessary)
__________________________________________
Title
__________________________________________
Contractor's License No.

Redlands Regular Meeting of 03-04-2025 892 of 1100
\\FILES\Engineering\Capital Projects\501900 WATER FUND AND PROJECTS\2025 Citywide Pavement Repair\7 BID AND AWARDS_PRECONSTRUCTION\7-6 CONTRACT AWARD_NTP\Public Work Contract.PW-3.1(Work Days).doc

WORKER'S COMPENSATION INSURANCE CERTIFICATION
Description of Contract: City of Redlands
Municipal Utilities and Engineering Department
2025 Citywide Pavement Repair for Water Utilities
Project No. 20250114
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to selfinsure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

Dated this day of , 2025.
_____________________________________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)
(SEAL)
(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.)
Redlands Regular Meeting of 03-04-2025 893 of 1100
\\FILES\Engineering\Capital Projects\501900 WATER FUND AND PROJECTS\2025 Citywide Pavement Repair\7 BID AND AWARDS_PRECONSTRUCTION\7-6 CONTRACT AWARD_NTP\Public Work Contract.PW-3.1(Work Days).doc

FAITHFUL PERFORMANCE BOND
Whereas, the City of Redlands (“City”), State of California, and ______________ (hereinafter designated as "Principal") have entered into an agreement dated _____, 20XX (“Agreement”) whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as 2025 Citywide Pavement Repair for Water Utilities and is hereby referred to and made a part hereof; and
Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of ________________________________ dollars ($_______________) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.

As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.

Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:

1. Complete the Work in accordance with its terms and conditions; or

2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, but not exceeding, including other costs and damages for which Surety may be liable hereunder, the Redlands Regular Meeting of 03-04-2025 894 of 1100
\\FILES\Engineering\Capital Projects\501900 WATER FUND AND PROJECTS\2025 Citywide Pavement Repair\7 BID AND AWARDS_PRECONSTRUCTION\7-6 CONTRACT AWARD_NTP\Public Work Contract.PW-3.1(Work Days).doc amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.

Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.

No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.

The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.

In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2025.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:___________________________________
__________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone ( )___________________________
Redlands Regular Meeting of 03-04-2025 895 of 1100
\\FILES\Engineering\Capital Projects\501900 WATER FUND AND PROJECTS\2025 Citywide Pavement Repair\7 BID AND AWARDS_PRECONSTRUCTION\7-6 CONTRACT AWARD_NTP\Public Work Contract.PW-3.1(Work Days).doc

LABOR AND MATERIAL BOND
Whereas, the City Council of the City of Redlands, State of California, and ________________ (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated ____________, 2025, and identified as 2025 Citywide Pavement Repair for Water Utilities is hereby referred to and made a part hereof; and Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of ______________ dollars ($_____) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2025.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of Surety) ____________________________________ Telephone: ( )___________________
Redlands Regular Meeting of 03-04-2025 896 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 897 of 1100

GENERAL CONDITIONS
(GC)
Redlands Regular Meeting of 03-04-2025 898 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 899 of 1100
GC 1

GENERAL CONDITIONS
The Standard Specifications for Public Works Constructions, 2021 Edition (Greenbook), together with supplements as published by Building News, Inc., are modified herein and comprise the Standard Specifications. For convenience, the section and subsection numbering system used in these modifications correspond to those used in the Greenbook. Unless specifically deleted or modified herein, all requirements of the Greenbook shall prevail.

SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS,

UNITS OF MEASURE, AND SYMBOLS
1-2 TERMS AND DEFINITIONS.

Agency - Amend as follows:
“The legal entity (City) for which the Work is being performed.” Bidder - Amend as follows:
“Any individual, firm, partnership, corporation, or combination thereof, licensed in accordance with the provisions of Chapter 9, Division III of the Business and Professions Code, submitting a Bid for the Work, acting directly or through a duly authorized representative.” City. The City of Redlands, San Bernardino County, California, being the legal entity for which the Work is being performed. Also referred to as Agency or Owner.

City Council. The City Council of the City of Redlands, San Bernardino County, California, being the body authorizing entrance into legal agreements and allowing work in public right-ofway or on public property controlled by the City of Redlands. Also referred to as Board.

Engineer - Amend as follows:
“The City Engineer of the Agency, or other person designated by the City Engineer, acting either directly or through authorized agents.”
Fabricated. An item specifically assembled or made out of selected materials to meet individual design requirements.

Guarantee. See Warranty.

Laboratory. The designated laboratory authorized by the City of Redlands to test materials and work involved in the Contract.

Manufactured. A standard mass-produced unit or item meeting design requirements.

Owner. The City of Redlands, San Bernardino County, California.

Pavement. The uppermost layer of material placed on the traveled way or shoulder. Also referred to as surfacing.

Redlands Regular Meeting of 03-04-2025 900 of 1100
GC 2
Rain Day. A scheduled working day when you cannot perform work on the controlling activity for at least 50 percent of the day with at least 50 percent of the normal labor and equipment due to adverse weather-related conditions that cause the Contractor to dismiss the crew.

Street - Delete and replace with the following:
“Any road, highway, parkway, freeway, avenue, street, lane, alley, crossing, intersection, court, place, circle, walk, way, or any public right-of-way within the jurisdiction of the Agency.” Surety - Delete and replace with the following:
“An admitted corporate surety as listed by the United States Department of Treasury and duly licensed to conduct business in the State of California and County of San Bernardino and acceptable to the City of Redlands, bound with and for the Contractor for the acceptable performance, execution, and completion of the Work, and for the satisfaction of all obligations incurred.”
Warranty. An extended insurance by the Contractor, of any product or item of work installed as a part of this project for replacement and/or repair for the time period specified, including but not limited to, all parts, labor, materials, tools, equipment costs, etc. necessary for the product or item of work to be in proper and acceptable working condition after completion of the project. For the purposes of this Contract, the period of coverage shall begin on the date of the Notice of Completion filed by the Owner.

Working Hours. Unless specified otherwise, working hours shall be from 7:00 AM to 4:00 PM, Monday through Friday, inclusive. Saturdays, Sundays, and City Holidays, as shown on the current year Construction Schedule, are excluded unless authorized by the City. 1-7.2 CONTRACT BONDS. - Add the following sentence to paragraph 1:

The warranty provisions set forth in Section 7-18 shall be secured by the Contract Performance Bond required under this section and said Bond shall remain in full force and effect for a period of one year from the date of completion as specified in the Notice of Completion.

SECTION 2 - SCOPE OF THE WORK
2-2 PERMITS. - Amend the following:

Amend the first sentence of paragraph 1 as follows:
“The Contractor will obtain all permits necessary to perform the work in streets, highways, railways or other rights-of-way.”
Add the following sentence between the first and second sentences of paragraph 1:

For all work within Caltrans right-of-way, the Contractor shall obtain their own Caltrans Encroachment Permit and pay all necessary permit and inspection fees as required by Caltrans.

Add the following paragraph:

The Contractor shall, prior to the start of work, procure all permits and licenses, including but not limited to, a City Business License for itself, subcontractors, and all parties performing actions Redlands Regular Meeting of 03-04-2025 901 of 1100
GC 3
associated with this contract within the City of Redlands, City Truck Route Permit, City Street/Lane Closure Permit, City Encroachment Permit, USA Verification Number, DOSH Excavation Permit, other permits required by agencies and/or utilities having jurisdiction on the work, pay all charges and fees required by the City, other agencies and utilities, and give all notices necessary and incidental to the due and lawful prosecution of the work. All City permits associated with this project are no fee to the Contractor.

SECTION 3 - CONTROL OF THE WORK
3-7 CONTRACT DOCUMENTS.
3-7.1 General. – Add the following paragraphs:

Contractor’s working drawings or plans for any structure not included in the plans shall be approved by the Engineer before any work is performed. It is mutually agreed that approval by the Engineer of the Contractor’s working plans does not relieve the Contractor of any responsibility for accuracy of dimensions and details, and that the Contractor shall be responsible for agreement and conformity of their working plans with the approved plans and specifications.

Finished surfaces in all cases shall conform with the lines, grades, cross sections, and dimensions shown on the approved plans. Deviations from the approved plans will be determined by the Engineer and approved in writing. In the event of a discrepancy between any drawing and the figures written thereon, the figures shall be taken as correct.

Should it appear that the work to be done or any matter thereto is not sufficiently detailed or explained by the plans and specification, the Contractor shall apply to the Engineer for such further explanation as may be necessary and shall conform to such explanation or interpretation as part of the Contract so far as may be consistent with the intent of the original plans and specifications. 3-7.1.1 Preconstruction Meeting. The Contractor to whom the contract is awarded, and all his major subcontractors, shall attend a pre-construction meeting. The time and location of said meeting will be set by the City. Contractor will be given adequate notice of such meeting. It shall be the Contractor's responsibility to notify his subcontractors of the time and location of the meeting. All submittals as required under the General Requirements shall be submitted by the Contractor at the time of the meeting.

The Contractor will be provided with an electronic (.PDF file) of the conformed plans and specifications for their use throughout the project. Contractor is responsible for all costs of reproduction.

Progress meetings will be scheduled by the City. The Contractor will be given at least five working days notice of the time and location of said meetings. The Contractor has the responsibility of notifying his subcontractors, suppliers, and fabricators of the time and location of said meetings.

Meetings will be held either at the job site, at the offices of the City of Redlands, or at any other location approved by the City. The Contractor may request, in writing, that a meeting be held.

The City will schedule a meeting at the Contractor’s request not more than five working days after receiving said written notice.

Redlands Regular Meeting of 03-04-2025 902 of 1100
GC 4
3-7.2 Precedence of Contract Documents. – Replace paragraph 2 with the following:

The precedence shall be (A. being highest, O. being lowest):

A. Permits from other Agencies as may be required by law.

B. Change Orders.

C. Contract.

D. Addenda.

E. Bid Schedule/Proposal.

F. General Requirements.

G. Technical Specifications.

H. Plans.

I. MUED General Permit Conditions and Trench Specifications.

J. City of Redlands Water & Sewer Systems Standard Specifications.

K. General Conditions.

L. City of Redlands Standard Specifications and Detail Drawings for Design and Construction of Public Improvements and all Supplements
M. Standard Specifications for Public Works Construction (SSPWC), 2018 Edition N. Standard Plans for Public Works Construction, 2012 Edition O. Reference Specifications.
3-8.7 Record Drawings. The Contractor shall maintain at the job site, a set of record drawings for the work showing: exact location information of all existing underground utilities encountered, final locations determined in the field, any deviations from the plans and specifications and new work performed within the work area; and all differences between the work as drawn and as installed for all concealed work as well as work added which is not shown on the drawings. Concealed work shall mean all work installed underground or in an area which cannot be readily inspected by use of access panels, inspection plates or other removable features. When vacuum excavation (potholing) services are required, contractor to provide report that identifies depth and alignment of underground utilities.

These record drawings shall be kept current and legible, and shall be available for inspection at all times by the Engineer, Architect and Contractor. All information, changes in the work or work added on these record drawings shall be marked in red. All markings shall use the same legends that are used on the drawings. Indicate locations by exact dimensions and elevations. Give dimensions and elevations from a permanent reference point and prepare all changes to scale.

At the end of construction, the contractor shall prepare one set of marked-up prints of the record drawings indicating any and all revisions and changes to the drawings reflecting As-Built conditions.

The drawings shall also contain a listing of all subcontractors who worked on the construction project.

The As-Built drawings will be submitted to the Municipal Utilities and Engineering Department for review and approval by the City Inspector and Engineer.

The design engineer or City staff shall prepare the final As-Built drawings for record purposes in one of the following two ways: (1) Check out the original drawings from the City and manually revise the drawings to reflect the As-Built condition; or (2) Re-plot the original drawings electronically on 4 mil mylars and make revisions electronically to reflect the As-Built conditions. The final As-Built drawings will be reviewed and approved by the City Inspector and Engineer Redlands Regular Meeting of 03-04-2025 903 of 1100
GC 5
The construction related bonds will not be released by the City until the As-Built drawings are accepted by the Engineer and all City stipulated conditions for the release of the bonds have been satisfied.
3-10 SURVEYING.
3-10.3 Line and Grade. - Add the following sentences to paragraph 1:

All distances and measurements shown are and will be made in a horizontal plane. Construction line and grade staking shall be set at maximum intervals of 25 feet when the grade is 0.50 percent or greater. Construction line and grade staking shall be set at maximum intervals of 12 feet when the grade is less than 0.50 percent.
3-10.4 Permanent Survey Markers.

The Registered (licensed) Land Surveyor or Registered Civil Engineer authorized to practice land surveying in accordance with all provisions of Section 8771 of the Business and Profession Code shall be hired as a subcontractor or employed by the Contractor. 3-10.5 Survey Service.

Contractor shall be responsible for: furnishing all surveying and staking, horizontal and vertical, as shown on the plans and in accordance with the specifications; furnishing all staking for sub-grade and base course grades per typical sections; replacing any existing monuments and ties which have been destroyed by construction; identifying, locating and tying out all monuments and ties necessary within the work area; and shall reinstall all disturbed monuments and ties, supplying the Engineer with copies of monument and tie sheets recorded with the County Surveyor in accordance with applicable State law. Monuments shall be approved by the Engineer.

Surveying and staking shall be done by a Registered (licensed) Land Surveyor or Registered Civil Engineer authorized to practice land surveying in accordance with all provisions of Section 8771 of the Business and Professions Code.

Unless otherwise specified, stakes will be set and stationed by the Contractor’s surveyor for curbs, headers, sewers, storm drains, structures, rough grade and all other staking necessary for the construction of the work. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet to be supplied to the Engineer. The Contractor shall dig all holes necessary for line and grade stakes.
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
3-13.2 Acceptance. - Add the following paragraphs:

The Contractor shall submit written assertion that the work has been completed prior to the Engineer making final inspection. The Engineer will have 48 hours to inspect the work. If the Engineer determines that the work is not complete, written notice will be given.

Until final acceptance of work by the Engineer, the Contractor shall have charge and care thereof from damage caused by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore, and Redlands Regular Meeting of 03-04-2025 904 of 1100
GC 6
make good all injuries or damage to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof.

All work which has been rejected shall be remedied or removed and replaced by the Contractor at their expense with work conforming to the plans and specifications. Any defective material or workmanship which may be discovered before final acceptance or within one year from the date of final acceptance shall be immediately corrected by the Contractor at their expense, notwithstanding that it may have been overlooked in previous inspections and estimates. Failure to inspect work at any stage shall not relieve the Contractor from any obligation to perform sound and reliable work as herein described. It is the Contractor’s ultimate responsibility to deliver a complete, operational project that complies in all details with these specifications, at the time of final acceptance.

Any omission or failure on the part of the City to discover or notify the Contractor of or to condemn defective work or material at the time of construction shall not be deemed as acceptance, and the Contractor will be required to correct defective work or material prior to final acceptance.

The City will endeavor to locate any errors or defective materials or workmanship and call them to the attention of the Contractor prior to subsequent work being performed. However, the City is under no obligation to do so and shall not be held liable because errors or defective material or workmanship by the Contractor are not discovered prior to subsequent work.

Nothing in this section shall be construed to limit the rights of the City to immediately correct conditions which are unsafe or which pose a public health nuisance. Should said corrections later be found to be caused by defective material and/or workmanship, the Contractor and their surety shall reimburse the City for costs reasonably incurred while attending the situation.

In the event it is necessary for the City to file suit to enforce any liability of the Contractor pursuant to this Section, the City shall be entitled to recover from the Contractor, in addition to all other amounts found due and owing, costs of suit and reasonable expenses and fees including reasonable attorneys’ fees incurred by the City in successfully enforcing the Contractor’s obligation, all to be taxed as costs and included in any judgment rendered.
3-13.3 Warranty. - Amend the following:

Amend the first sentence of the paragraph 3:
“The warranty period for specific items covered under manufacturers’ or suppliers’ warranties shall commence from the date of the final acceptance, except where longer warranty periods are specified.” Add the following paragraphs:

All start-up and testing shall be complete, approved and accepted before final acceptance, substantial completion, or beneficial occupancy.

The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the specifications or by law. The remedies provided herein shall not be exclusive and the City shall be entitled to any and all remedies provided by law.

Redlands Regular Meeting of 03-04-2025 905 of 1100
GC 7
3-14 INSPECTION.

The Contractor shall notify the Engineer at least 24 hours in advance before inspection is required.

Whenever the Contractor varies the period during which work is carried on each day, due notice shall be given to the Engineer so that proper inspection may be provided. Varied working hours may be allowed only upon written authorization from the Engineer.

Work financed in whole or in part with funds from another public entity or performed within the jurisdiction of another public entity shall be subject to inspection at all times by authorized representatives of that entity.

The work shall be ready for inspection, whether by City, other public entities or independent testing laboratories, at the scheduled times arranged by the Contractor. If, in the City’s sole judgment, the work is not ready and the inspection must be rescheduled, the Contractor shall be notified. The Contractor shall reschedule the inspection and provide the proper 24 hour notification for the rescheduled inspection. Any costs incurred by the City for rescheduled inspections shall be reimbursed prior to the release of Bonds.

In order to allow for inspection, the Contractor shall notify the City’s inspector sufficiently in advance of the permanent concealment of any materials or work. The City’s inspector shall make the appropriate notifications to other public entities and independent testing laboratories for inspections.

All inspections required in the specifications for this project shall be coordinated through the City’s inspector.

If any work is concealed or performed without the prior notice specified, the work shall be subject to such tests or exposure as may be necessary to prove to the City, Architect and Engineer, that the materials used and the work performed are in conformity with the drawings and specifications. All labor, tools, materials and equipment necessary for exposing and testing shall be furnished by the Contractor at their expense. The Contractor shall replace at their expense, any materials or work damaged by exposure or testing.

Overtime inspection may be requested by the Contractor. Overtime inspection includes but is not limited to, any hours worked outside of the inspector’s normal working hours including weekends and holidays. Such requests shall be on a case-by-case basis as determined by the Engineer. If the Engineer so determines and approves, overtime inspection shall be paid for by the Contractor at the current City billing rate at the time of request or as billed by other public entities or independent testing laboratories. Any costs incurred by the City for overtime inspection shall be reimbursed prior to the release of Bonds.

SECTION 4 - CONTROL OF MATERIALS
4-1 GENERAL. - Delete and replace with the following:

Should any work performed or material furnished under the Contract prove defective or not in accordance with the Plans and Specifications and in the opinion of the Engineer such defect is not of Redlands Regular Meeting of 03-04-2025 906 of 1100
GC 8
sufficient magnitude or importance to make the work dangerous or unusable, or if the removal of such work is impracticable or will create dangerous or undesirable conditions, the Engineer at his discretion shall have the right and authority to retain such work instead of requiring it to be removed and reconstructed, but he shall make such deductions therefore in the payment due the Contractor as may be just and reasonable.
4-1.1 Warranty of Title. No materials, supplies or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants clear and good title to all materials supplied and equipment installed and incorporated in the work and agrees, upon completion of all work, to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by him, to the Owner free from any claims, liens, encumbrances or charges, and further agrees that neither he nor any person, firm, or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon, provided that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this article, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Owner. 4-1.2 Clayton Act. In submitting a bid to the City, if the bid is accepted the Contractor agrees it will assign to the City all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.

Section 15) or under the Cartwright Act (chapter 2 [commencing with Section 16700] of Part 2 Division 7 of the Business and Professionals Code), arising from purchases of goods, materials, or services by the Bidder for sale to the City pursuant to the bid. Such assignment shall be made and become effective at the time the City tenders final payment to the Bidder.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITES
5-1.1 CONTRACTOR’S EQUIPMENT AND FACILITIES.

A noise level limit of 86 dbA at a distance of 15 m (50 feet) shall apply to all construction equipment on or related to the work whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided, except in those cases required for the protection of personnel. 5-1.2 General.

The enclosed toilets required by this section shall be located within an approved yard, if one is acquired by the Contractor. If a yard is not acquired by the Contractor or the project is not within a City owned property, the toilets must be installed on a trailer and removed from the jobsite each day.

At no times shall toilets be stored within the public right of way outside of working hours. 5-3 LABOR. - Amend the following:
5-3.1 General. - Add the following paragraphs:

Redlands Regular Meeting of 03-04-2025 907 of 1100
GC 9
Employment of apprentices are required on projects of $30,000 or more. Provisions in Sections 1777.5 of the California Labor Code fixes responsibility of compliance with that section for all apprenticeable occupations with the Contractor. Section 1777.5 provides that the Contractor and every Subcontractor shall submit contract award information to the applicable joint apprenticeship committee. One apprentice hour for every five journeymen hours worked is the minimum State requirement applicable to each apprenticeable trade. Section 1777.7 of said Labor Code provides that the Contractor shall forfeit as a civil penalty the sum of one hundred dollars ($100.00) for each calendar day of noncompliance with provision of said Section 1777.5.

The Contractor will observe all applicable health and safety requirements, including, but not limited to the California and Federal Occupational Safety and Health Acts. The Contractor shall submit for review by the City a Site Specific Health and Safety Plan prior to the commencement of construction activities. This Plan shall meet or exceed the requirements of 29 CFR 1910.120. 5-3.2 Prevailing Wages. - Add the following paragraphs:

Contractors are hereby notified that pursuant to Section 1770 of the Labor Code of the State of California, the City Council of the City of Redlands, California, by Resolution No. 2326, has ascertained the general prevailing rate of hourly wages and rates for legal holidays and overtime work in the locality where this work is to be performed, for each craft or type of workman or mechanic needed to execute the Contract which will be awarded to the successful Bidder. The Contractor shall comply with Sections 1770 to 1780 inclusive of the Labor Code and Master Labor Agreement of Southern California.

The Contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this Contract in full less legally required deductions and also deductions made pursuant to the regulations prescribed under the so-called “Kick- Back Statute” (48 Sta. 948; U.S.C. 875; 40 U.S.C. 276c).

In accordance with Section 1775 of the California Labor code, Contractor shall forfeit to City, as a penalty, a minimum of $40 for each day, or portion thereof, and a maximum of $200 for each day, or portion thereof, for each worker paid, either by Contractor, or any subcontractor, less than the prevailing rates as determined by the Director of the California Department of Industrial Relations for the work.

Contractor further agrees to fully comply with all applicable provisions of the California Labor Code including but not limited to Sections 1771, 1775, 1776, 1777.5, 1813 and 1815. Failure to abide by prevailing wages and laws by Contractor will be enforced.

The Contractor or subcontractor shall, as a penalty, to the State or political subdivision on whose behalf the contract is made or awarded forfeit twenty-five ($25) dollars for each worker employed in the execution of the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any calendar day and 40 hours in any calendar work in violation of Labor Code section 1813.

Redlands Regular Meeting of 03-04-2025 908 of 1100
GC 10
5-3.3 Payroll Records. – Delete and replace with the following:

The contractor and subcontractors shall submit electronic certified payroll on a weekly basis to the City of Redlands through LCPtracker. LCPtracker is a web-based labor compliance management system. The Prime Contractor and Subcontractors and lower-tier Subcontractors will receive an email from LCPtracker providing their log-on identification and temporary password. The Contractors will need to follow the instructions in the email to set-up their permanent password and activate their account. Once their account is setup, LCPtracker Inc. provides either computer based or web based training. Training can be accessed via the “Book Now” button located under the “Projects” tab. The prime contractor shall submit their certified payroll, along with any subcontractor who is performing any labor, on a weekly basis. The prime contractor is responsible for all communication with their subcontractors and shall submit their subcontractor’s certified payroll as part of their weekly payroll packet. All labor compliance correspondence and submissions will be made through the LCPtracker software.

All certified payroll shall be submitted no later than 7 days from the close of the pay period. The payroll records shall set out accurately and completely the name, social security number, classification and hourly wage rate of each employee, hours worked by employee during the payroll period and a full weekly wages and the actual weekly wages paid to the employee. Such certified payroll records shall be made available at all time for inspection by the City, the Department of Industrial Relations, the Department of Labor or authorized representatives within ten days of request. The contractor and subcontractor shall preserve weekly payroll records for a period of three (3) years from the date of completion of the Contract. In case on noncompliance with said Section 1776 and after a ten-day period following receipt of written notice, the Contractor shall forfeit to the California Department of Industrial Relations one hundred dollars ($100.00) for each calendar day or portion thereof, for each worker in non-compliance, until compliance is effectuated.

In order to meet labor compliance requirements, all contractors will be required to complete eDocuments which are accessed, submitted and approved through LCPtracker. All eDocuments are required to be signed by an owner/officer or authorized signer. The Prime Contractor and each Subcontractor and every lower-tier Subcontractor and any Vendors subject to this provision shall comply with Title 8, Section 16404 of the California Code of Regulations.

A Fringe Benefit Statement shall be submitted with the first payroll and is required for both the prime contractor and any subcontractors. A new Fringe Benefit Statement will be required when general determinations are issued in February and August. Please refer to the DIR website for additional details. Any weeks where no work was performed must be represented by the submittal of a Statement of Non-Performance covering the 7 day pay period where no hours were worked on the site. Final payroll on the project should state “Final” on the certified payroll, and must be marked as such in the LCPtracker system.

Failure by the Contractor to comply with the aforementioned requirements shall result in withheld progress payments until such time certified payroll documents have been received, reviewed, and accepted by the City. The City reserves the right to seek assistance from the State Department of Industrial Relations in determining the acceptability of certified payroll submittals before release of withheld progress payments. Prior to the release of retention monies, all certified payroll must be Redlands Regular Meeting of 03-04-2025 909 of 1100
GC 11
submitted on the project and any outstanding issues that may have occurred throughout the project must be resolved.
5-4 INSURANCE. - Delete Section 5-4.1, Section 5-4.2 and replace with the following:

Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract.

Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non-contributing to any insurance or self-insurance maintained by the City. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective.

The coverage shall provide the following minimum limits based on the type of work proposed under this Contract. The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Designated Insurance Requirements shown below.

TIER 1 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits and
Conduit Construction (streets) Grading of Land Street Cleaning Caisson or Cofferdam Work Hazardous Materials Contractors Street or Road Construction Dam or Reservoir Construction Irrigation or Drainage
Construction
Tank Construction, Installation,
Erection or Repair
Demolition (structures) Landscape Construction (street or street medians)
Telephone or Cable Line
Construction
Drilling Painting (exterior greater than
single story)
Tree Pruning, Dusting, Spraying
or Removal
Redlands Regular Meeting of 03-04-2025 910 of 1100
GC 12
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission ➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Commercial Umbrella/ Excess Liability
➢ $5 Million Per Occurrence/ Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission e. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
Redlands Regular Meeting of 03-04-2025 911 of 1100
GC 13
TIER 2 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission ➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC) Systems
(service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair) Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors Redlands Regular Meeting of 03-04-2025 912 of 1100
GC 14
indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees.

To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.

Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements from each subcontractor.

The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.

The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given.

The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and the City.

Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.
5-4.3 Worker’s Compensation Insurance. - Delete and replace with the following:

A. Contractor shall have worker’s compensation and employer’s liability insurance in force throughout the duration of the contract in an amount which meets the statutory requirement with an insurance carrier acceptable to the City. The insurance policy shall include a provision prohibiting cancellation of said policy except upon forty-five (45) days prior written notice to City. Certificates of Insurance shall be delivered to the City at the time of the Contractors’ execution of the agreement.

B. Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were Redlands Regular Meeting of 03-04-2025 913 of 1100
GC 15
caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees. 5-6 PATENT FEES OR ROYALTIES. Delete and replace with the following:

The Contractor shall include in its Bid the patent fees or royalties on any patented article or process which may be furnished or used in the Work. The Contractor shall indemnify and hold the City harmless from any legal action that may be brought for infringement of patents. The Contractor’s attention is directed to “Notice of Patents, Data, and Copyright Regulations” of the Federal Labor Standards.

The Contractor shall bear all costs arising from the use of patented goods and/or processes used on and/or incorporated into the Work. When use of these goods and/or processes is judged to be an infringement and the use is banned, the Contractor, at its own expense, shall, with concurrence of the Engineer, do one of the following:

A. Secure for the City the right to continue using goods and/or processes by suspension of the injunction or by procuring a license(s);
B. Replace said goods and/or processes with non-infringing goods and/or processes; C. Modify said goods and/or processes so that they become non-infringing; or D. Remove said goods and/or processes and refund the sum paid therefore without prejudice to any other rights of the City.

The preceding shall not apply to any goods manufactured to the detailed design of the City contained in the Contract Documents.
5-7 SAFETY.
5-7.1 Work Site Safety.
5-7.1.1 General. - Amend the following:

Add the following sentences to paragraph 1:

Should watering be the sole method utilized for roadway dust abatement purposes, the maximum time interval that shall elapse between applications thereof shall be no greater than 3 hours during normal working day, supplemented by an additional application thereof immediately prior to the conclusion of the workday and at such other times as may be required, including evenings, weekends and holidays as required by the Engineer. Should the Contractor be unable to furnish dust abatement as specified, the City may perform or cause to be performed the necessary service, the expense of which will be deducted from the payment due the Contractor.

Add the following paragraphs:

Redlands Regular Meeting of 03-04-2025 914 of 1100
GC 16
To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during cleanup and dust control operations. Refer to Section 7-8.6.

Compliance with this section is of extreme importance to the City and its citizens. The City may fine the Contractor $1,000 per incident if there are issues with dust, mud, unused equipment or materials and rubbish within the construction area that result in citizen complaints. A 24 hour notice shall be issued to the Contractor and failure to correct the problems will result in the fine being levied. This fine will be in addition to those fines potentially charged for NPDES violations. 5-8 AIR POLLUTION CONTROL.

Dust control shall be performed in accordance with Subsection 7-8 of the Standard Specifications, South Coast Air Quality Management District (SCAQMD) Rule 403, the general Provisions and the following Provision.

Dust resulting from the Contractor’s performance of the work, either inside or outside, the right-ofway shall be controlled by the Contractor. Dust control includes the action necessary to prevent, reduce or control dust within the work area as required to complete the work. The Contractor shall carry out proper and efficient measures to prevent his operations from producing dust in amounts damaging to property or causing a nuisance, or harm to persons living nearby or occupying buildings in the vicinity of the work. The Contractor shall control dust 24 hours a day, seven days a week. The methods to be used for controlling dust in the construction area and along haul roads shall be approved by the Engineer prior to starting any work. The Rule 403 Implementation Handbook published by the SCAQMD, contains a detailed listing of reasonably available dust control measures.

Dust control ordered by the Engineer to be applied on Saturdays, Sundays or holidays will be included in the Contract price for dust control and no additional compensation will be allowed therefore.

The full compensation for all direct and indirect costs incurred for work performed or materials used to control dust resulting from the Contractor’s performance of the work and caused by public traffic, either inside or outside the right-of-way shall be considered as included in the Contract prices paid for the various items of work involved and no additional compensation will be allowed therefore. 5-9 STORAGE OF EQUIPMENT AND MATERIALS.

The Contractor shall be required to provide and maintain as necessary, any additional property required for storage of equipment, materials, etc., to perform work on this project. Should the additional property be located within the city limits of the City of Redlands, the Contractor shall obtain written approval from the City of Redlands Development Services Department and comply with all conditions set therein prior to use. When private property is used for a yard area, the Contractor shall also secure written authorization from the private property owner and supply a copy of such to the City before any monthly progress payment is submitted. Contractor to propose designated areas of the project site, upon approval by the Engineer, suitable for material delivery, storage, and waste collection.

Redlands Regular Meeting of 03-04-2025 915 of 1100
GC 17
The Contractor shall ensure the construction yard adheres to all local, State and Federal regulations, ordinances, codes and maintained in a neat and orderly manner throughout the duration of the project.

The contractor shall include the construction yard in the Erosion Control Plan or SWPPP and shall be inspected and approved prior to use of the yard. If at any time during the project the location of the construction yard changes from the approved site, the City shall be notified prior to relocation for inspection and approval. Should the Contractor fail to comply with these conditions, the Engineer may suspend the work per SSPWC section 6-3 until the condition is corrected.

At the end of the project or as required, the Contractor shall: clean up and remove all trash and debris, including all organic trash and debris; clean up and remove all hazardous and biochemical wastes from the property to the satisfaction of the agency (City, County, State, or Federal) charged with overseeing these items; and provide to the City a written release from the private property owner that they are satisfied with all clean up and removal work.
5-9.1 Storage in Public Streets.

Construction materials and equipment shall not be stored within public streets or right of way without prior approval from the City. In order to seek approval, Contractor shall submit a location map with all equipment or materials identified including size, duration and any BMP’s installed and provide at least 7 days for review by the City.
5-10 WATER POLLUTION CONTROL.

The Contractor shall follow the City's guidelines for Storm Water Pollution Prevention in providing storm water pollution control at the project site, including the implementation of approved Erosion/Sediment Control Plans during construction as well as the implementation of approved Water Quality Management Plans.

Construction activities disturbing 1 acre or more of land shall comply with the State Water Resources Control Board’s NPDES General Construction Storm Water Permit. A copy of the Notice of Intent (NOI) to include the Waste Discharge Identification (WDID) number shall be submitted as part of the Storm Water Pollution Prevention Plan (SWPPP) to the Engineer for review. Call (909) 782- 4130 for NOI/WDID information.

All projects requiring grading shall submit to the City for review and approval an Erosion/Sediment Control Plan and a Grading Plan. Permit(s) will not be issued until plans are approved and may be revoked if work required in these specifications are not complied with.

Construction sites shall be maintained by implementation of BMPs in such manner that pollutants are not discharged from the site to the maximum extent practicable. A few references available to help with selection and implementation of applicable BMPs are:

1. California Storm Water Best Management Practice Handbook, American Public Works Association, March 1993;

2. The Construction Site Best Management Practices Manual, November 2000;

3. Storm Water Pollution Prevention Plan and Water Pollution Control Program Preparation Manual, November 2000;
Redlands Regular Meeting of 03-04-2025 916 of 1100
GC 18

4. California Regional Water Quality Control Board’s San Francisco Bay Region, Guidelines for Construction Projects; and

5. California Regional Water Quality Control Board’s San Francisco Bay Region, Erosion and Sediment Control Field Manual, July 1999.

All discharges into the storm drain system are prohibited except for potable water, properly treated discharge, and those discharges specifically approved by the Engineer. The following are some of the prohibited discharges:

1. Discharges that could have an impact on human health or the environment, cause or threaten to cause pollution, contamination, or nuisance;

2. Discharges that exceed any applicable water quality standard contained in a statewide Water Quality Control Plan or local Basin Plan; and

3. Discharges containing hazardous substances equal to or in excess of a reportable quantity listed in Federal regulations 40 CFR, Parts 117 and 302.

Materials that can cause or contribute to pollution or a violation of any applicable water quality standard include, but are not limited to: sediments; solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides or herbicides and wood preservatives or solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants or hydraulic, radiator and battery fluids; fertilizers; vehicle and equipment wash water or concrete wash water; concrete, detergent or floatable wastes; wastes from any engine and equipment steam cleaning or chemical degreasing; and chlorinated potable water line flushings.

Unless exempted or authorized by an NPDES permit, all non-storm water discharges require prior approval by the Engineer or the State Water Resources Control Board with Engineer approval.

During construction, temporary storage of such materials as identified above, must occur in a designated area physically separated from potential storm water runoff, with ultimate disposal in accordance with local, state and federal requirements.

De-watering of contaminated groundwater or discharging contaminated soils via surface erosion is prohibited.

Unless indicated otherwise by the Engineer, all projects, regardless of size, shall submit for review and approval, a Water Quality Management Plan (WQMP). The WQMP shall consist of post construction BMPs which shall remain in effect throughout the life of the facility. Refer to WQMP guidelines.
5-11 TEMPORARY LIGHTS, POWER AND WATER.

Any water drawn from a City fire hydrant shall be via a City owned water meter. Said meter may be obtained from the Municipal Utilities & Engineering Department. Contractor is responsible for payment of a $1200 deposit fee. Said meter shall be returned in a condition like received, less normal wear and tear. All meters are loaned subject to the conditions of the Fire Hydrant Construction Meter Redlands Regular Meeting of 03-04-2025 917 of 1100
GC 19
Water Service Application. Contractor must provide proposed location of meter and notify Customer Service at (909) 798-7516 each time the meter is relocated during construction. Water reasonably used in connection with the construction contract will be provided at no cost to the Contractor. Water use determined to be wasteful or unreasonable will be charged for at the prevailing rate. 5-12 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS.

The Contractor shall relocate, re-establish, repair or replace all existing improvements within the work limits or right-of-way which are not designated for removal (e.g., sprinkler systems, curbs, sidewalks, driveways, fences, walls, signs, utility installations, pavement, structures, etc.) which are damaged or removed as a result of its operations.

Relocations, re-establishments, repairs and replacements shall be at least equal to existing improvements and shall match them in finish and dimension.

All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing or reestablishing existing improvements shall be included in the Bid.

The Contractor shall be responsible for the maintenance of the streets and roadways to be used by public and local traffic through and adjacent to the construction zone, from the date of "Notice to Proceed" until the date of acceptance of the completed construction improvements.

Street maintenance shall include filling of potholes, grading of subgrade and base, replacing signs, installing interim pavement striping and markers on the project streets and other side streets within the construction zone. Street maintenance shall also include sweeping and washing of streets, adjacent and connected to the construction zone on a weekly, or more frequent schedule, to prevent the accumulation of dust, dirt, gravel or other deleterious materials, all as necessary to maintain the construction roadways and adjacent streets in a safe, clean and drivable condition for use by public and local traffic.

Upon request from the City for information pertaining to a claim against the contractor, contractor shall provide a written/email response, including all requested information, within 14 calendar days of City’s request. If a response with all requested information is not provided to the City within 14 calendar days, a penalty of $500 per calendar day will be assessed to the Contractor by the City. 5-13 PUBLIC CONVENIENCE AND SAFETY.
5-13.1 General.

The Contractor may be allowed to close the roadway, or a portion thereof, to traffic during normal work hours upon approval from the Engineer. During any closure, the Contractor shall allow access for residents, schools, trash service trucks, churches and businesses within the affected portion of roadway, except as required for construction for a reasonable period of time. The Contractor shall notify residents as noted within Section 5-18.

The Contractor shall provide and install barricades, delineators, warning devices and construction signs in accordance with the Work Area Traffic Control Handbook (WATCH) prepared by the Redlands Regular Meeting of 03-04-2025 918 of 1100
GC 20
Southern California Chapter of the American Public Works Association. During adverse weather or unusual traffic or working conditions additional devices shall be placed as directed by the engineer.

All traffic signs and devices shall conform to the current State of California, Department of Transportation (CALTRANS), "Manual of Warning Signs, Lights, and Devices for Use in Performance of Work upon Highways", unless otherwise approved by the Engineer.

Fences, barriers, lights and signs shall be furnished, erected and maintained as necessary to give an adequate warning to the public at all times that the work is under construction and of dangerous conditions to be encountered as a result thereof, and warning and directional signs shall also be erected and maintained as may be required by the City. Should the Contractor fail to furnish a sufficient number of traffic and/or pedestrian safety devices within three (3) hours after being notified, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the following provisions:

1. For placing of barricades - $15.00 per barricade for each day or part thereof.

For flashers - $15.00 per flasher for each day or part thereof.

For traffic cones - $7.50 per cone for each day or part thereof.

2. In the event that the services of the Owner are required outside the normal working hours and/or days or items not noted above are furnished by the City, all costs incurred by the City shall be the responsibility of the Contractor.

The Contractor shall relocate, preserve and maintain the visibility of all signs within the project limits which affect the flow of traffic, as directed by the engineer. Any signs that are missing or found damaged shall be replaced immediately by the Contractor at his expense.

The Contractor shall provide and maintain Class II barricades along excavation edges parallel to the flow of traffic at a spacing of twenty-five feet (25'). Class II barricades mounted with flashers shall be installed around work areas in parkways. Class II barricades shall have alternating black and reflectorized white (or yellow) stripes at an angle of 45 degrees. The stripe with shall be four to six inches.

During paving operations barricades may be supplemented with minimum size eighteen-inch (18") high traffic cones and delineators such that spacing between barricades and/or cones or delineators is no greater than twenty-five feet (25"). At all access points such as intersecting streets, alleys and driveways, barricades and/or cones shall be provided at five-foot (5') intervals so as to prevent vehicular access to the paving area. Where access from an intersecting street is prohibited, a "Road Closed" sign shall be provided. "No Left Turn" sign shall be provided wherever required by the Engineer.

Clearances from traffic lanes shall be 5 feet to the edge of any excavation and 2 feet to the face of any curb, pole, barricade, delineator or other vertical obstruction.

Redlands Regular Meeting of 03-04-2025 919 of 1100
GC 21
A 4 foot wide pedestrian walkway shall be maintained in the parkway area on each side of all streets, unless otherwise authorized by the Engineer. The minimum clearance from: the edge of pedestrian walkways to any traffic lane shall be 5 feet; the edge of pedestrian walkways to any work zone shall be 3 feet; and the surface of pedestrian walkways to any overhead obstruction shall be 7 feet.

The Contractor shall, at the end of each work day, have backfilled, compacted and placed a temporary drivable roadway surface on all work areas within traveled roadways prior to leaving the job site. Failure to comply to the satisfaction of the Engineer shall result in immediate correction by City forces, and all costs shall be borne by the Contractor.

Traffic control devices shall be marked with the Contractor’s name as appropriate. At no time shall any traffic control devices marked with companies or agencies other than the Contractor or subcontractors, be utilized within the work area.

All said traffic controls and safety devices shall be maintained in clean condition, with any and all graffiti removed by the end of workday on which the graffiti was first reported to the Contractor.

If the traffic control devices are deemed unacceptable by the Engineer due to being damaged, dirty, or marked incorrectly, the Contractor shall replace the traffic control devices immediately. Should the Contractor fail to furnish traffic control devices within three (3) hours after being notified, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the provisions above.
5-13.1.1 Vehicular Access.

At such times as driveways are inaccessible due to the Contractor's work they shall be blocked by two (2) Class II barricades or one (1) Class II barricades and two (2) delineators. Driveways that are ramped or planked for temporary access shall be provided with a delineator at each side. 5-13.1.2 Signage. The Contractor shall furnish, erect and maintain all construction traffic signage as required and specified.

All construction traffic signage shall be in place prior to commencing any work, placed as needed during construction, moved as necessary and removed only upon completion of all work.

All construction traffic signage and controls shall comply with the State of California Manual of Traffic Controls, Warning Signs, Lights and Devices for use in Performance of Work Upon Highways. All construction traffic signage used in the performance of the work shall be a minimum of the encapsulated lens (high intensity) type. All traffic controls and safety devices, equipment and materials, including but not limited to cones, channelizers, delineators, flashing warning lights, barricades, high level warning devices, telescoping flag trees, flags, signs, markers, portable barriers, flashing arrow signs, changeable message signs, markings and flagging equipment shall be provided and maintained in like new condition.

When a Traffic Signal is constructed as a part of the project, the Contractor shall place and maintain for one calendar month, a message board for each approach leg to a new traffic signal. The message board shall read “CAUTION - NEW TRAFFIC SIGNAL”. The one month period shall Redlands Regular Meeting of 03-04-2025 920 of 1100
GC 22
begin from the day of activation. This requirement may be lessened or waived, on a case-by-case basis, by the Engineer.

The Contractor shall furnish and properly install, construct, erect, use and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, including holidays, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include areas affecting or affected by the work, from the date of notice to proceed to the completion and acceptance of the work. Any corrective work required to be performed by City forces shall be charged to the Contractor and paid in full before release of any bonds on the project.

All traffic cones shall be no less than 28 inches in height, except that shorter cones, 12 inches minimum height, may be permitted during striping maintenance operations where the only function of the cone is to separate traffic from the wet paint. All barricades used to delineate traffic at night or placed in or adjacent to the traveled roadway at night, shall be equipped with flashing warning lights.

Channelizers shall be required when lane restrictions, detours or other work conditions need to be maintained for periods longer than normal work hours. Channelizers shall be surface-mounted type and shall be furnished, placed and maintained at the locations shown on the plans or as approved by the Engineer and shall conform to these specifications. Channelizers shall be, at the Contractor’s option, one of the following types, or approved equal: (1) Safe-Hit SH236SMA; (2) Repo “The Replaceable Post”; or (3) Carsonite, “Super Duck” SDF-436.SDF-436. 5-13.2 Traffic Control Plan
The Contractor shall provide a Traffic Control Plan to the agency for approval prior to the scheduled commencement of work. Comments and corrections shall be returned to the Contractor within five (5) working days.

The Contractor shall be required to maintain one lane in each direction when working on the roadway.

Access to schools, businesses, etc. shall be maintained as necessary for their operations. If closures are authorized by the Engineer, all detour signage shall be installed prior to closure of specified portion of roadway(s), and shall be maintained during closure.

The Contractor shall make provision to allow pedestrians full access across work areas at existing crosswalks, while working within those areas.

Traffic controls, including but not limited to vehicular and pedestrian traffic controls, maintenance of vehicular and pedestrian access, detours, and street closures shall be in accordance with Subsection 7-1, of the current edition of the "Standard Specifications for Public Works Construction," including all its subsequent amendments, and the current edition of the "Work Area Traffic Control Handbook." Traffic control and the Traffic Control Plan shall conform to the following:

Redlands Regular Meeting of 03-04-2025 921 of 1100
GC 23
a. All major streets shall remain open to through-traffic at all times, residential street will be closed to traffic only as long as it takes for material application and drying time.
b. The Traffic Control Plan shall indicate the traffic control requirements for the different types of work to be performed. The Contractor shall be responsible for the preparation of Plans as necessary for specific items of work. These Plans shall be approved by the City's Engineer. c. All traffic controls and safety devices, equipment and materials, including but not limited to cones, delineators, flashing warning lights, barricades, high level warning devices (flag trees), flags, signs, markers, portable barriers, flashing arrow signs, markings, and flagging equipment shall be provided and maintained in "like new" condition.
d. The Contractor shall furnish and properly install, construct, erect, use, and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include area affecting or affected by the work, from the start of work to the completion of the work.

In the event the slurry and cape seal ravels, a "loose gravel" (C6) sign shall be placed to adequately warn the public.
e. High-level warning devices (flag trees) are required at all times for any work being performed within the roadway unless otherwise specifically authorized by the City's Engineer.
f. All barricades shall be equipped with flashing warning lights, and all traffic cones shall be no less than twenty-eight inches (28") in height, except that shorter cones, twelve inches (12") high or higher, may be used during striping maintenance operations where the only function of the cones is to protect the wet paint from the traffic.
g. Type III barricades, no less than six feet (6') in length and equipped with two (2) Type "N" markers each and two (2) flashing warning lights each, shall be used to close streets, except as otherwise specifically authorized in advance by the City's Engineer for minor maintenance work of no more than one (1) working days duration on weekdays, or on holidays only, and between 8:00 a.m. and 3:30 p.m. only. Said barricades shall be placed across the full roadway at each point of closure with the distance between Redlands Regular Meeting of 03-04-2025 922 of 1100
GC 24
barricades or between barricades and curbs, not exceeding three feet (3'), except that one (1) eleven-foot (11')-wide gap between barricades shall be provided at the center of the street. Barricades to the right of the street's center, facing the inbound vehicular traffic, shall also be equipped with one (1) Type C2 "Road Closed" sign each or one (1) Type C3A "Road Closed to Thru Traffic" sign each.
h. Except for residential streets, as otherwise directed and/or authorized by the City's Engineer, two-way vehicular traffic shall be maintained at all times within two (2) eleven foot (11')-wide lanes on streets, having an effective roadway width of forty-four feet (44') or more with restricted parking, and other streets of lesser widths may be reduced to one (1) twelve-foot (12') wide lane with work activity being limited to one side at a time, and with one-way vehicular traffic being maintained at all times by properly trained and experienced flaggers.

No reduction of the traveled way width shall be permitted on any City street before 8:00 a.m. nor after 3:30 p.m., on weekends or holidays, or when active work is not being done, unless prior authorization to do so is granted by the City's Engineer.

Arrow boards shall be required for all lane closures on major streets. i. Properly trained and experienced flaggers shall be provided to traffic when said traffic is to be interrupted, when two-way traffic is to be reduced to one-way traffic, and at such other times as is necessary to safely pass the traffic through or around the work area, and when so directed by the City's Engineer.
j. Vehicular access to occupied residential property may be restricted on weekdays other than holidays between the hours of 8:00 a.m. to 3:30 p.m. while essential work activity is taking place, with specific prior written approval from the City's Engineer, providing the Contractor gives the owner and/or resident at least forty-eight (48)-hour advance written and oral notice. See Part 2, "Notification of Residents," herein.

Convenient and safe pedestrian access to occupied residential property shall be maintained at all times. Access to mailboxes must be maintained at all time, such that the postal delivery service is not interrupted.

Access to vacant and unused property may be restricted at the Engineer's discretion. Both vehicular and pedestrian access shall be maintained at all times to all other property except as otherwise specifically authorized in writing by the City's Engineer.

Redlands Regular Meeting of 03-04-2025 923 of 1100
GC 25
k. Any traffic control and safety devices and equipment being used which becomes damaged, destroyed, faded, soiled, misplaced, worn out, inoperative, lost, or stolen shall be promptly repaired refurbished and/or replaced, and any traffic control and safety devices and equipment being used which are displaced or not in an upright position from any cause, shall be promptly returned or restored to their proper position. l. An unobstructed view of all signs and warning devices including but not limited to stop signs, stop ahead signs, street names signs, and other regulatory, warning and construction signs, markers, and warning devices shall be maintained at all times. No trucks or other equipment or materials shall be stopped, parked, or otherwise placed so as to obscure said signs, markers, and devices from the view of vehicular and/or pedestrian traffic to which it applies.
m. When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether empty or loaded, shall yield to said public traffic at all times, except where the traffic is being controlled by police officers, fire officers, properly trained and experienced flaggers, or at traffic signalized intersections.
n. Stockpiling and/or storage of materials on any public right-of-way or parking areas will not be allowed without specific permission of the Engineer. Materials spilled along or on said right-of-way or parking areas shall be removed completely and promptly. All stockpile and/or storage areas shall be kept in a safe, neat, clean, and orderly fashion, and shall be restored to equal or better than original condition upon completion of the work.
o. Where vehicular access to abutting property must be restricted, the work shall be so selected, arranged, and scheduled that the person(s) requiring access to said abutting property and/or residents along said streets affected will be able to park within a reasonable distance of not more than five hundred feet (500') from their homes and/or destination. Residents must be supplied written notice of such restrictions a minimum of 48 hours in advance.
p. When work has been completed on a particular street or has been suspended or rescheduled, and said street is to be opened to vehicular traffic, all equipment, "NO PARKING" signs, other obstructions, and unnecessary traffic control devices and equipment shall be promptly removed from that street except as otherwise authorized or directed by the City's Engineer. q. Should the Contractor be neglectful, negligent, or refuse, fail, or otherwise be unavailable to promptly, satisfactorily, and fully comply with the provisions specified and referred to hereinabove, the City reserves the right Redlands Regular Meeting of 03-04-2025 924 of 1100
GC 26
to correct and/or mitigate any situation, which in the sole opinion of the City's Engineer constitutes a serious deficiency and/or serious case of noncompliance, by any means at its disposal at the Contractor's and/or permittee's expense, and will deduct the cost therefore from the Contractor's progress and/or final payment. Such corrective action taken by the City shall not reduce or abrogate the Contractor's legal obligations and liability for proper traffic control and safety measures, and shall not serve to transfer said obligations and liabilities from the Contractor to the City or the City's agents.
r. Violations of any of the above Provisions and/or Provisions of the referenced publications, unless promptly and completely corrected to the satisfaction of the City's Engineer, shall at the sole discretion of the City, be grounds for termination of the Contract, or shut down or partial shutdown of the work, without compensation to the Contractor and/or permittee, or liability to the City, all as prescribed by Contractual obligation or State law, whichever is applicable.

Full compensation for furnishing all labor, materials, tools, equipment, flaggers, lights, channelizers (surface mounted), temporary striping, barricades, portable flashing lights, flashing arrow signs, traffic control and detour plan, and incidentals required to comply with the provisions specified and referred to herein above, to provide all required traffic and pedestrian control for the duration of this contract, all as shown and as specified, shall be paid as specified in Section 01200 of the General Requirements and no other compensation shall be made therefore.

5-13.3 Edison Energized Conductors. The Contractor hereby promises and agrees that in the performance of the Work, he will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to Edison's secondary, primary and transmission facilities. The term "qualified person" is defined as follows:
"Qualified Person". A person by reason of experience or instruction is familiar with the operation to be performed and hazards involved.

Contractor further promises and agrees that the provisions of this paragraph shall be and are binding upon any Subcontractor or Subcontractors that may be retained by it, and that the Contractor shall take such steps as are necessary to insure compliance by said Subcontractor or Subcontractors with the requirements of this paragraph.
5-14 CONTRACTOR’S RESPONSIBILITY FOR DAMAGE.
5-14.1 Responsibility for Damage. The Contractor agrees to and does hereby indemnify, defend and hold harmless the City, its elected officials and the Consultant and their officers, agents and employees from every claim or demand made, and every liability, loss, damage, or expense of any nature whatsoever, including attorney's fees and costs, which may be incurred by reason of:

Redlands Regular Meeting of 03-04-2025 925 of 1100
GC 27
(a) Liability for damages for (1) death or bodily injury to persons, (2) injury to loss or theft of property, (3) any other loss, damage or expense arising under either (1) or (2) above, sustained by the Contractor or any person, firm or corporation employed by the contractor upon or in connection with the work called for in this agreement, except for the liability resulting from the sole negligence or willful misconduct of the City, its elected officials and their officers, employees and agents who are directly employed by the City and the Consultant; and (b) any injury to or death of persons or damage to property caused by any fault, neglect, default or omission of the Contractor, or any person, firm or corporation employed by the Contractor, either directly or by independent contract, including all damages due to loss or theft, sustained by any person, firm or corporation, including the City, arising out of, or in any way connected with the work covered by this agreement, whether said injury or damage occurs either on or off City property, provided that any of the foregoing (1) is attributable to personal injury, bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself), including the loss of use resulting there from, and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, any supplier, anyone directly or indirectly employed by any of them or anyone for whose act or omissions any of them may be liable, regardless of whether or not caused in part by any act or omission (active, passive, or comparative negligence included, excepting the active negligence of the District) of a party indemnified hereunder.
(c) The Contractor, at its own expense, cost, and risk shall defend any and all actions, suits or other proceedings that may be brought or instituted against the City, its elected officials, officers, agents and employees and the Consultant, against any such claim, demand or liability, and shall pay or satisfy any judgment that may be rendered against the City, its elected officials, officers, agents or employees, in any such action, suit or other proceedings as a result thereof.
5-15 NO PERSONAL LIABILITY. Neither the City Council, the Engineer, the Consultant, nor any other officer or authorized assistant or agent shall be personally responsible for any liability arising under the contract.
5-16 CONTRACTOR'S RESPONSIBILITY FOR WORK. Except as provided above, until the formal acceptance of the Work by the City, the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part thereof by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the Work. The Contractor shall rebuild, repair, restore, and make good all injuries or damages to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof, except such injuries or damages occasioned by act of the federal government or the public enemy.

The City of Redlands shall not be held responsible for the care or protection of any material or parts of the work prior to final acceptance, except as expressly provided in these specifications.

Redlands Regular Meeting of 03-04-2025 926 of 1100
GC 28
The City shall not be responsible for security of the Contractors equipment or materials at the site.

The City will not be responsible for theft or damage to any property or materials of the Contractor.

Security for Contractor’s property shall be the responsibility of the Contractor. 5-17 WARRANTY OF WORK. The Contractor shall guarantee the Work against defective materials or workmanship for a period of (1) year from the date of completion date specified in the Notice of Completion, except where longer warranty periods are specifically stated. As specified in Section 2-4 in the GENERAL CONDITIONS, the Performance Bond shall remain in full force and effect during the warranty period.

All work which has been rejected, shall be remedied, or removed and replaced, by the Contractor at his own expense, with work conforming to the Plans and Specifications. Any defective material or workmanship which may be discovered before final acceptance or within (1) one year from the completion date specified in the Notice of Completion shall be corrected immediately by the Contractor at his own expense notwithstanding that it may have been overlooked in previous inspections and estimates. Failure to inspect work at any stage shall not relieve the Contractor from any obligation to perform sound and reliable work as herein described. It is the Contractor's ultimate responsibility to deliver at the time of final acceptance a complete project that complies in all details with these Contract Documents. All items shall be ready to operate.

Any omission or failure on the part of the Owner to discover or notify the Contractor of or to condemn defective work or material at the time of construction shall not be deemed an acceptance, and the Contractor will be required to correct defective work or material prior to final acceptance.

The Owner will endeavor to locate any errors or defective materials or workmanship and call them to the attention of the Contractor prior to subsequent work being performed. However, the Owner is under no obligation to do so and shall not be held liable because errors or defective material or workmanship by the Contractor are not discovered prior to subsequent work.

During the (1) one year warranty period, should the Contractor fail to remedy defective material and/or workmanship, or to make replacements within five (5) days after written notice by the Owner, it is agreed that the Owner may make such repairs and replacement and the actual cost of the required labor and materials shall be chargeable to and payable by the Contractor or his Surety.

Nothing in this section shall be construed to limit the rights of the Owner to immediately correct conditions which may be unsafe or which may pose a public health nuisance. Should said conditions later be found to be caused by defective material and/or workmanship, the Contractor and his Surety shall reimburse the Owner for costs reasonably incurred while attending the situation.

In the event it is necessary for the Owner to file suit to enforce any liability of the Contractor pursuant to this sections WARRANTY OF WORK, the Owner shall be entitled to recover from the Contractor, in addition to all other amounts found due and owing, costs of suit and reasonable expenses and fees, including reasonable attorneys' fees, incurred by the Owner in successfully enforcing the Contractor's obligations, all to be taxed as costs and included in any judgment rendered.

Redlands Regular Meeting of 03-04-2025 927 of 1100
GC 29
The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the Contract Document or by law. The remedies provided herein shall not be exclusive and the Owner shall be entitled to any and all remedies provided by law. 5-18 NOTIFICATION OF RESIDENTS/BUSINESSES. The Contractor shall notify all residents, firms, institutions, agencies, and utility companies which may be affected by the work.

Notification shall be by hand delivery of an approved notice within the project limits approved by the City. The notification process shall consist of two notifications, one prior to the start of construction for all properties within the project area and a second notification at least seven days in advance of any activity which may impact each specific property. In the event of any work within the downtown area, the distribution of the second notification shall be at least fourteen days in advance of any activity. Activities impacting said properties and, therefore, requiring the above said notices include the following: the work itself; closure or partial closure of the street; and disallowance of street parking and disallowance of vehicular ingress to or egress from the property.

Said firms, institutions, agencies, and utility companies which must be notified of proposed work shall include, but are not limited to the following: public schools, private schools, day care centers, postal service, hospitals, governmental services, police department, fire department, ambulance services, Omnitrans, solid waste collection, and City street sweeping.

The proposed notice shall be submitted to the Engineer at least seven calendar days prior to the date of distribution for review and approval. The submittal shall also include a map identifying the limits of the work and proposed limits of distribution. The printed notices shall contain a general description of the work to be done, the name of the street with limits, the day and date of the work and the name and telephone number of the Contractor. The notice shall also include a statement that there will be no disruption of trash collection schedules and that trash should be set out by 6:00 a.m. on the scheduled day of pickup. If on-street parking will be affected the notice shall include a statement that no on-street parking will be allowed between the hours of 7:00 a.m. and 5:00 p.m. on the day of work, and a statement that it will be necessary to tow away parked vehicles at the owner's expense per California Vehicle Code CVC 22651L and CVC 22654D.

The Contractor will provide City with the dates and addresses of when project notifications are delivered to affected properties. City will verify the notification process is completed in compliance with the requirements of the specifications. Work will commence when City approves Contractor’s compliance with the requirements set forth in the specifications.

If on-street parking is affected, the Contractor shall also post pre-approved "NO PARKING-TOW WAY" signs on 1 x 2 wood stakes or barricades at one hundred foot (100’) maximum spacing along the affected areas of the street, 48 hours prior to the start of the work. The "NO PARKING-TOW AWAY" signs shall contain the day, date, and hours that parking will be prohibited on that particular street and a statement that parked vehicles will be towed away at owner's expense per California Vehicle Code CVC 22651L and CVC 22654D. The Contractor shall maintain said signs throughout the day of work, and shall start the removal of said signs by 4:00 p.m. and complete the removal by 6:00 p.m. on said day of work or as otherwise directed by the Engineer.

Redlands Regular Meeting of 03-04-2025 928 of 1100
GC 30
The Contractor shall document the day, date, and time the signs are installed because the no parking restriction cannot be enforced until the signs have been in place 24 hours. Posting of signs on trees, utility poles, light standards and other existing parkway improvement is strictly forbidden.

In the event of street resurfacing operations, the notices to residents shall contain a statement that the street to be resurfaced will be closed to vehicular traffic, and the suggestion that if they require the use of their vehicles on the day of the resurfacing work, they should consider parking their vehicle on a nearby street which is not scheduled for a resurfacing application.

In the event scheduled work is delayed, theContractor shall immediately remove all "NO PARKING" signs. The contractor must notify all previously notified, in person and with printed notices, that the work will be rescheduled and that they will be re-notified 48 hours in advance. The Contractor shall have an adequate supply of approved notifications for distribution to residents.

Full compensation for conforming to these requirementsshall be considered as included in the various Contract items of work involved, and no additional compensation will be allowed therefore.

Failure to comply with this section shall result in a penalty assessment imposed of up to $10,000 per violation at the City’s discretion.

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. - Add the following paragraph:

Contractor shall notify Underground Service Alert (USA) at 1 (800) 227-2600, two working days prior to starting work, and must submit verification number to the City prior to starting work. 6-1.2 Commencement of the Work. - Amend the second sentence as follows:
“The work shall start within 10 days thereafter, and be diligently prosecuted to completion within the Contract Time.”
6-3 TIME OF COMPLETION.
6-4.1 General. - Add the following paragraphs:

If saturated soil is encountered during construction due to leaks in an existing utility, contractor shall remove saturated material and replace with a suitable backfill material until adequate compaction can be attained by verification from the City's Geotechnical Engineer.

Prior to any removal of saturated material, contractor shall discuss the methods of remediation with the City's representative. Approval from the City, or the City's representative, shall be obtained for any amount of saturated material removal in which the contractor anticipates to be compensated for, if approval is not obtained all costs shall be borne by the contractor.

Up to a 14 day delay in paving operations may be requested after all leaks have been resolved to provide time for excess moisture to dissipate, at no additional cost to the city, in lieu of removing and replacing the saturated soil. A no cost change order will be prepared to provide the contractor with additional contract time if such delay is requested by the City.

Redlands Regular Meeting of 03-04-2025 929 of 1100
GC 31
6-9 LIQUIDATED DAMAGES. The value of liquidated damages noted in this section is amended to five hundred dollars ($500) per working day.
6-10 NOTICE AND SERVICE THEREOF. Any notice required or given by one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving such notice or by duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:

Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the project site, or by deposing the same in the United States Mail enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of work under this Contract, certified and with postage prepaid.

Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated by him to the party giving the notice, certified and with postage prepaid.

Notice shall be given to the Owner by personal delivery thereof or by depositing the same in the United States Mail enclosed in a sealed envelope, certified and with postage prepaid. The address of record for the owner is:

City of Redlands
Municipal Utilities & Engineering Department
P.O. Box 3005
35 Cajon Street, Suite 15A
Redlands, CA 92373
6-11 PUBLIC RECORDS ACT. All documents, Plans, specifications and all other information relating to the conduct of the City’s business, including information submitted by the Contractor, shall become the exclusive property of the City and except as provided by law shall be deemed public records. Said information shall be subject to the provisions of the California Public Records Act (Government Code Sections 6250 et seq.).

Under no circumstances will the City be responsible or liable to the Contractor, submitter or any other party for the disclosure of any records or information submitted to the City, regardless of whether such records or information are labeled “Trade Secret”, “Confidential”, or “Proprietary” (or words to similar effect) and regardless of whether the disclosure is required by law or a court order or occurs through inadvertence, mistake, or negligence on the part of the City or its officers, employees, and/or Contractors.

The City will not advise as to the nature or content of documents entitled to protection from disclosure under the California Public Records Act, including interpretations of the Act or the definition of “Trade Secret”. The submitting party shall be solely responsible for all determinations made under the Act, and where appropriate for clearly and prominently marking each and every page or sheet of Redlands Regular Meeting of 03-04-2025 930 of 1100
GC 32
information with “Trade Secret”, “Confidential”, or “Proprietary”. Each submitting party is advised to contact its own legal counsel concerning the California Public Records Act and its applicability to the submitting party’s own circumstances.

In the event of litigation concerning the disclosure of any information submitted by the submitting party, the City’s sole involvement will be as a stakeholder, retaining the information until otherwise ordered by a court. The submitting party, at its sole expense and risk, shall be responsible for any and all fees and costs for prosecuting or defending any action concerning the information, and shall indemnify and hold the City harmless from all costs and expenses including attorneys’ fees, in connection with such action.

SECTION 7 - MEASUREMENT AND PAYMENT
7-3 PAYMENT.
7-3.2 Partial and Final Payment. - Delete and replace with the following:

The closure date for the purpose of making monthly progress payments shall be assigned by the Engineer during the pre-construction meeting. Payment, less deductions, unearned work and retention, will be made within 30 days of the closure date. If a dispute exists between the City and the Contractor regarding an item included in the Contractor's Monthly Progress Payment Request, progress payments will be withheld until said dispute is resolved, in which case longer period of time will be required to make such payment. No such payment shall be required to be made, when in the judgment of the Engineer, the total value of the work since the last estimate amounts to less than $500.

If, in the opinion of the Engineer, work is not progressing according to the approved schedule, payments may be withheld until the Contractor returns to the approved schedule.

Deductions will be made for: (1) amounts due the Owner for equipment or material furnished or services rendered; (2) amounts due the Owner under the terms of the Contract; (3) amounts of any claims of lien filed with the Owner; (4) accrued amounts of liquidated damages; (5) amounts required to be deducted by Federal, State or local governmental authorities. From the balance thus determined will be deducted the amounts of all previous payments, and the remainder shall constitute the monthly payment due the Contractor.

A retention of five percent (5%) will be withheld from each and every progress payment to the Contractor. This percentage will remain constant throughout the duration of the Contract. The City shall make a progress payment within thirty (30) days after receipt of an undisputed and properly submitted payment request from Contractor pursuant to Public Contract Code section 20104.50.

After completion of the work to the satisfaction of the Engineer, the Engineer shall make a final estimate of the amount of work done. The City shall pay the entire sum so found to be due after deducting there from all previous payments and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. The final payment shall not be due and payable until the expiration of thirty-five (35) days from and after the recordation of the Notice of Completion filed by the City.

Redlands Regular Meeting of 03-04-2025 931 of 1100
GC 33
As provided by paragraph 22300 of the California Public Contract Code, the Contractor may substitute securities for any monies withheld by the City to ensure performance under the Contract.

Substitute securities shall be deposited in a financial institution in a form acceptable to the City of Redlands. The financial institution shall be located within the City limits of the City of Redlands.

The Escrow Agreement to be used is set forth in Public Contract Code section 22300. 7-3.3 Delivered Materials. - Delete and replace with the following:

No payment will be made for materials or equipment delivered but not yet incorporated in the work. 7-4.2.6 Extras. Without invalidating the Contract, the City may order extra work or make changes by altering, adding or deducting from the work, the Contract sum being adjusted accordingly and the consent of the Surety being first obtained where necessary or desirable. All the Work of the kind bid upon shall be paid for at the price stipulated on the proposal, and no claims for any extra work or material shall be allowed unless the work is ordered in writing by the engineer and the price is stated in such order.
7-4.2.7 Claims for Extra Costs. No claim for extra work or cost shall be allowed unless the same was done in pursuance of a written order by the Engineer, as aforesaid, and the claim presented with the first estimate after the changed or extra work is done. When work is performed under the terms of the General Conditions, the Contractor shall furnish satisfactory bills, payrolls, and vouchers covering all items of cost and when requested by the City, give the City access to accounts relating thereto.

After completion of the work to the satisfaction of the Engineer, the Engineer shall make a final estimate of the amount of work done. The City shall pay the entire sum so found to be due after deducting there from all previous payments and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. The final payment shall not be due and payable until the expiration of the thirty-five (35) days from and after the recordation of the Notice of Completion filed by the City.

SECTION 8 - FACILITIES FOR AGENCY PERSONNEL
This section is deleted in its entirety.

SECTION 9 - ASSIGNMENT OF UNFAIR BUSINESS PRACTICES
CLAIMS
9-1. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the City all rights, title and interest and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with section 16700 of part 2 of division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this public works agreement. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgment by the Parties.

Redlands Regular Meeting of 03-04-2025 932 of 1100
GC 34
SECTION 10 - TRENCHING AND EXCAVATION
10-1. If this contract involves digging trenches or other excavations that extend deeper than (4) feet below the surface, the following shall be done pursuant to California Public Contract Code Section 7104:

A. That the Contractor shall promptly and before the following conditions are disturbed, notify the City in writing, of any:
(1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II or Class III disposal site in accordance with provisions of existing law. (2) Subsurface or latent physical conditions differing from those indicated. (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.

B. That the City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor’s cost of, or the time required for, performance of any part of work shall issue a change order under the procedures described in the contract.

C. That, in the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. The Contractor shall retain any and all rights provided either by contract or by law which pertains to the resolution of disputes and protests between the contracting parties.

SECTION 11 - REMOVAL, RELOCATION OR PROTECTION OF

EXISTING UTILITIES
11-1. Pursuant to Government Code Section 4215 et seq, the City shall assume the responsibility between the parties to this contract, for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the site of the construction project for this contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids.
11-2. The Contractor shall be compensated for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not identified in the plans and specifications with reasonable accuracy and for equipment on the project necessarily identified during such work.

Redlands Regular Meeting of 03-04-2025 933 of 1100
GC 35
11-3. The Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the City, or the owner of the utility to provide for removal or relocation of such utility facilities.

11.4. The City shall not be required to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the site of the construction project can be inferred from the presence of other visible facilities, such as buildings, meter and junction boxes, on adjacent to the site of construction, provided, however, nothing herein shall relieve the City from identifying main or trunk lines in the plans and specifications.

11.5. Nothing herein shall preclude the City from pursuing appropriate remedy against the utility for delays which are the responsibility of the utility.

11.6. If the Contractor, while performing the contract, discovers utility facilities not identified by the City in the contract plans or specifications, Contractor shall immediately notify the City and the utility in writing.

11.7. The public utility, when it is the owner, shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price.

11.8. Contractor shall comply with Government Code Section 4216 through 4216.9.

11.9. Conduits from existing street light and traffic signal systems may be encountered during construction of this project. All removals, relocations, and/or replacements of existing conduit systems shall be performed in accordance with these specifications and City standards, by a qualified electrical contractor. All costs for said work shall be borne by the Contractor and paid as a part of the various items of work requiring such removals, relocations, and/or replacements, and no other compensation shall be made therefore.

SECTION 200 - ROCK MATERIALS
200-2 UNTREATED BASE MATERIALS.
200-2.1 General. - Amend the first paragraph as follows:
“Materials for use as untreated base or subbase shall be classified in the order of preference as follows:

Crushed Aggregate Base
Crushed Miscellaneous Base
Pulverized Miscellaneous Base.”
200-2.4.1 General. - Delete the second sentence and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” 200-2.4.2 Grading. - Amend the first sentence of paragraph 1 as follows:
“The material shall be uniformly graded and shall conform to the ‘fine’ gradations:” Redlands Regular Meeting of 03-04-2025 934 of 1100
GC 36
200-2.5.1 General. - Delete the third sentence and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” 200-2.8.1 General. - Amend as follows:

Delete the second sentence of paragraph 1 and replace with the following:
“Pulverized miscellaneous base may contain underlying base material.” Delete the third sentence of paragraph 1 and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” SECTION 201 - CONCRETE, MORTAR AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE.
201-1.1.1 General - Add the following paragraph:

The Contractor shall furnish the Engineer in the field with a copy of the mix design to be used, and with a legible certified weighmaster's certificate for each load of PCC delivered to the project.

PCC delivered to the project site having a water content and/or slump greater than that specified in the mix design, shall be rejected and removed from the project site. 201-1.1.2 Concrete Specified by Class and Alternate Class - Amend Table 201-1.1.2.(A) as follows:

Street Surface Improvements section -
All concrete in this section shall have a minimum compressive strength at 28 days of 22,410 kPa (3,250 pounds per square inch), and meet the requirements of class 330-C-23 (560-C-3250) concrete.

Sewer & Storm Drain Facilities section, Sidehill Surface Drainage Facilities subsection - All concrete in this subsection shall have a minimum compressive strength at 28 days of 22,410 kPa (3,250 pounds per square inch), and meet the requirements of class 330-C-23 (560-C-3250) concrete.
201-1.4.3 Transit Mixers. - Replace the first sentence in paragraph 6 with the following:

The total elapsed time between addition of water at the batch plant and the completion of the discharge of the PCC from the mixer, shall not exceed ninety (90) minutes. All PCC remaining in the mixer, after said ninety (90) minutes time limit, shall be rejected and removed from the project site.

SECTION 203 - BITUMINOUS MATERIALS
203-3 EMULSIFIED ASPHALT.
203-3.1 General. - Modify the section by adding the following:

Asphalt emulsion shall be a QUICKSET ANIONIC OR CATIONIC EMULSIFIED ASPHALT conforming to the requirements of Subsection 203-1.3, “Test Reports and Certification”, and Subsection 203-1.2, “Testing Requirements” of the Standard Specifications.

Redlands Regular Meeting of 03-04-2025 935 of 1100
GC 37
The latex additive shall be Ultra Pave 70 (for anionic) or Ultra Pave 65 K (for cationic) or an approved equal. The latex shall be added at the emulsion plant after weighing the asphalt and before the addition of mixing water. The latex shall be added at a rate of two to two-and-one-half (2 to 225) parts to one-hundred (100) parts of emulsion by volume. 203-5 SLURRY SEAL.
203-5.1 General. - Delete the sentence and replace with the following:

Slurry seal shall be emulsion-aggregate slurry (EAS) conforming to 203-5.4. 203-5.2 Mix Design. - Modify the section by adding the following:
(f) Admixtures, such as Portland Cement or aluminum sulfate may be mixed into the slurry material to adjust curing time such that the applied slurry can support vehicular traffic within 60 minutes.
(g) Use of slag shall not be permitted.
(h) Deliveries of aggregate and emulsion shall not be made without the engineer present.

Emulsion is not to be transferred to an on-site storage tanker without the sieve test performed by the City.
203-5.3.2 Grading. - Delete the sentence and replace with the following:

The combined aggregate gradation shall be determined in accordance with ASTM C136 and conform to Type II requirements shown in Table 203-5.3.2 (A). 203-5.4.1 General. – Modify the paragraph and replace with the following:

EAS shall be a stable mixture of emulsified asphalt, aggregate, water, a set control agent, and latex.

EAS shall be Type II-CQS-1h-EAS.
203-5.4.2.1 Aggregate. – Delete the sentence and replace with the following:

Aggregate shall be Type II conforming to 203-5.3.
203-5.4.2.2 Emulsified Asphalt. – Modify the first paragraph and replace with the following:

Emulsified asphalt shall be quick-set, and contain latex. Quick-set emulsified asphalt shall be CQS-1h conforming to 203-3.
203-6 ASPHALT CONCRETE.
203-6.1 General. - Add the following paragraph:

Unless otherwise approved by the Engineer, asphalt concrete for paving shall be C2-PG 64-10 (1/2”) for finish paving or B-PG 64-10 (3/4”) for base paving. Asphalt concrete for Type D1 or Type D2 curb shall be D2 –PG 70-10.

Redlands Regular Meeting of 03-04-2025 936 of 1100
GC 38
SECTION 206 - MISCELLANEOUS METAL ITEMS
206-7 TRAFFIC SIGNS.
206-7.1 General. The Contractor shall furnish or relocate and erect all traffic signage as required and specified.

All new traffic signage shall be a minimum of the encapsulated lens (high intensity) type, have an anti-graffiti protective covering and be installed on new posts. All traffic signage to be relocated shall be installed on new posts.
206-7.2 Protective Covering. Anti-graffiti protective covering shall be Type 1150-POF, manufactured by 3M Company, or approved equal.
206-7.3 Post and Base. New posts and bases shall be Ultimate Sign Support System as manufactured by Western Highway, or approved equal.

SECTION 207 – GRAVITY PIPE
207-2 REINFORCED CONCRETE PIPE (RCP).
207-2.1 General. - Add the following sentences to paragraph 2:

The minimum D-load for any RCP shall be 1,350. The minimum size for RCP shall be 18 inches (457 mm) unless otherwise approved by the Engineer.

SECTION 211 - MATERIAL TESTS
211-1 COMPACTION TESTS.
211-1.4 General. The Contractor shall be responsible for all quality control for all work. The Contractor shall complete all necessary testing to ensure the quality requirements within the specifications are achieved. The Contractor shall conduct the compaction testing by a geotechnical engineering firm and the results of the testing shall be made available to the Engineer.

The City will complete assurance testing throughout the project by an independent testing firm.

The City will perform the first compaction test required at any location. If such test does not meet the required specifications, the City will make additional tests until the required compaction is obtained and withhold from the final payment due the Contractor, the cost of all such additional tests. To be acceptable, tests must be ordered and witnessed by the City. Tests will be ordered by the City and performed at a location and depth as directed by the City. The Contractor shall assist the City in performing these tests as necessary. The Contractor shall provide to the City the maximum dry density and the optimum moisture content results of backfill and bedding material when requested by the City.

Redlands Regular Meeting of 03-04-2025 937 of 1100
GC 39
SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS
214-4 PAINT FOR STRIPING AND MARKINGS.
214-4.1 General. - Amend the first sentence in paragraph 4 as follows:
“Glass beads conforming to 214-3 shall be mechanically applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”
SECTION 300 - EARTHWORK
300-1 CLEARING AND GRUBBING.
300-1.1 General. - Amend as follows:

Amend paragraph 3 as follows:
“The natural ground surface shall be cleared of all vegetable growth, such as trees, logs, upturned stumps, roots of downed trees, brush, grass, weeds, shrubs, ground cover, tree stumps, decorative landscape rocks, edging, railroad ties, other decorative landscape treatments, boulders, rock, portland cement concrete, and all other objectionable materials, within the limits of construction.” Add the following paragraphs:

Grubbing and removal of organic debris shall include the repair and/or replacement of all parkway irrigation piping and systems necessary to perform work on this Contract and capping pipelines until such time that permanent repairs and/or replacements have been made.

All debris removed from the project site under this item shall be disposed of at an approved dump site. All transportation costs and dump fees shall be borne by the Contractor.

Clearing and Grubbing shall include, but is not limited to, the following:

1. Removal of existing AC berms.

2. Removal of all curb and gutter, cross gutters, and spandrels shall be replaced within three (3) calendar days. The Asphalt Concrete patch for areas with curbs and gutters removed and replaced shall be placed within two (2) working days after the curb and gutter, cross gutters, and spandrels are replaced. Removal of all sidewalks shall be replaced within three (3) calendar days.

3. Saw cut and removal of poles, posts, PCC pavements, curb, gutter, and sidewalk. Holes resulting from removal of existing poles and posts from existing PCC, AC pavements and curbs and gutters, shall be filled or patched with like materials. Self-propelled drop hammers will not be allowed for removals.

4. Removal of all raised pavement markers not conforming to the approved plan or conflicting with the proposed striping as shown on the plans in accordance with Subsection 312-3, Removal, of the Standard Specifications.

Redlands Regular Meeting of 03-04-2025 938 of 1100
GC 40

5. Removal and disposal of boulders, rock or PCC.

6. All trees and shrubs less than 3m (9 ft) directly above the entire sidewalk surface shall be trimmed and removed by the contractor to allow a clear path of travel for pedestrians.

7. Irrigation system relocation:

Any irrigation systems in conflict with the proposed improvements that are removed, damaged, disturbed, or broken shall be modified, repaired, and/or replaced to be operable and provide full irrigation coverage to the areas requiring irrigation using new materials, equal or better than the original materials, with 20 mm (3/4 in) Schedule 40 PVC being the minimum acceptable for underground lines and 13 mm (1/2 in) Schedule 80 being minimum acceptable for risers and with the systems not being out of operation for more than two (2) days. No payment for work associated with the irrigation repair will be released, until all irrigation is complete, operable and accepted by the City.

All trees, shrubbery and lawns deprived of normal irrigation watering due to a disruption of service caused by the Contractor’s operations shall be regularly and thoroughly irrigated by the Contractor so that said plantings will not be damaged. If any trees, shrubbery or lawns die or suffer unacceptable damage as a result of or precipitated by the Contractor’s operations the Contractor shall replace same with the same plant species and size. Existing grass lawns within areas that must be excavated and/or re-graded shall be cut into approximate 305 mm (1 ft) squares, removed, protected, cared for and replaced as soon as possible. Dead, dying, and unacceptably damaged grass shall be replaced with new grass sod.

8. Existing inlets, slotted drains, drainage pipes, concrete gutters, drainage pipes, where any portion of such structure is within 1m of the grading plane in the excavation areas, or within 300 mm (1 ft) of original ground in embankment areas, or where shown on the plans to be removed, shall be completely removed and disposed of accordingly.

9. Removal and disposal of existing drainage inlet structure and PCC or AC apron.

10. The Contractor shall dispose all materials not being salvaged outside of the right-of-way and shall pay for all costs for disposal.

11.Removal and disposal of any abandoned utilities that may interfere with the improvements.

12.Self-propelled drop hammers will not be allowed for removals. 300-1.3.1 General. - Add the following paragraphs:

The Contractor shall dispose portland cement concrete, stone rubble, and brick at an approved dump site.

All reprocessed asphaltic cement concrete may be placed as the lower course of crushed aggregate base material. If the Contractor chooses not to reprocess the material, disposal at an approved Redlands Regular Meeting of 03-04-2025 939 of 1100
GC 41
dump site shall be required. All costs for disposal shall be borne by the Contractor. If the Contractor chooses to reprocess material, it shall be protected and remain contaminate-free, otherwise disposal at an approved dump site will be required with all costs borne by the Contractor.

All reprocessed asphaltic cement concrete to be used as crushed aggregate base shall be ground to conform to Section 200-2.2.
300-1.3.2 (a) Bituminous Pavement. - Amend the following:

Amend the second sentence as follows:
“Saw cutting of edges to be joined shall be with a power-driven saw. The groove shall be cut to a minimum depth of 4 inches (102 mm).”
Amend the third sentence as follows:
“Where bituminous pavement is to be removed, a cold mill header cut of maximum 6 feet (1.8 m) in width perpendicular to the join line shall be made, and a minimum laying depth of 1 inch (25mm) of new pavement material shall be provided at the join line.” Amend the fourth sentence as follows:
“The edges of existing concrete pavement adjacent to the trench shall be saw cut to neat straight lines for the purpose of removing the damaged pavement areas.” Add the following sentence:

Work under this item shall include asphalt concrete berms. 300-1.3.2 (b) Concrete Pavement. - Amend the following:

Amend the second sentence as follows:
“Saw cuts shall be made to a minimum depth of 4 inches (102 mm).” Amend the third sentence as follows:
“If a saw cut in concrete pavement falls within 5 feet (1.5 m) of a construction joint, cold joint, expansion joint, or edge, the concrete shall be removed to the joint or edge.” 300-1.3.2 (c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveways and Alley Intersections. - Amend the following:

Amend the first sentence as follows:
“Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of 4 inches (102 mm).”
Amend the third sentence as follows:
“No section to be replaced shall be smaller than 36 inches (1 m) in either length or width.” Amend the fourth sentence as follows:
“If the saw cut in sidewalk or driveway would fall within 36 inches (914 mm) of a construction joint, expansion joint, or edge, the concrete shall be removed to the joint or edge, except that where Redlands Regular Meeting of 03-04-2025 940 of 1100
GC 42
the saw cut would fall within 12 inches (300mm) of a score mark, the saw cut shall be made in and along the score mark.”
Amend the fifth sentence as follows:
“curb and gutter shall be sawed to a depth of 4 inches (102 mm) on a neat line at right angles to the curb face.”
300-1.3.2 (d) Striping and Markings. All existing striping, markings and raised pavement markers shown to be removed or necessary to be removed from paving areas. This item includes removal in compliance with applicable laws and cleanup of residue from the operation.

All striping, markings and raised pavement markers removed beyond the limits shown on the plans for and/or at the convenience of the Contractor shall be replaced at the Contractor’s expense. 300-1.3.2 (e) Structures. All existing concrete structures (reinforced or non-reinforced) as shown on the plans to be removed or abandoned, including but not limited to, undersidewalk drains, manholes, headwalls, bulkheads, drop inlet structures, energy dissipaters, catch basins, vaults and pipelines. Abandonment shall include all cuts and concrete plugs necessary to seal ends or openings of abandoned pipes or structures.
300-1.3.2 (f) Rock Curbs. All rock from rock curb removals, as shown on the plans or required for construction of the project, shall be transported, delivered and unloaded at a storage site as directed by the Engineer.
300-1.3.2 (g) Miscellaneous Removals. All other removals of facilities, as shown on the plans but not covered under separate bid items, and any underground facilities found during the work and not shown on the plans shall be performed. The City has endeavored to show all known underground facilities but is not responsible for unknown or abandoned facilities. Unknown underground facilities shall be paid as extra work.
300-1.3.2 (h) Miscellaneous Relocations. All relocation work as shown on the plans or required for construction of the project, but not covered under separate bid items, shall be included as a part of Subsection 300-1 Clearing and Grubbing. All relocation work performed as a part of clearing and grubbing work shall conform to the requirements and specifications of the agency or utility having jurisdiction over the item to be relocated.
300-1.4 Payment. - Add the following sentence to paragraph 1:

Payment for work on this item shall be made as a percentage of the work completed at each monthly payment.
300-2 UNCLASSIFIED EXCAVATION.
300-2.2.2 Wet Material. - Amend the second sentence of the paragraph:
“If such high moisture content is not the result of any action on the part of the Contractor, or inaction in protecting the work during the course of the contract, the work involved will be paid for in the following manner: Over-excavation and disposal work shall be considered “extra work,” Redlands Regular Meeting of 03-04-2025 941 of 1100
GC 43
with backfill and compaction of crushed aggregate base paid under the appropriate bid item in these specifications.”
300-12 MISCELLAENOUS GRADING. The parkway, whether landscaping exists or not, shall be graded and compacted to achieve drainage towards the street at a slope of 2%. Grading shall be coordinated such that it is the last item of work to be completed, prior to site clean-up. Loose material and dirt shall be raked, compacted and distributed throughout the parkway area. Areas adjacent to installed improvements must be graded to a level within one inch from the finished surface. Extra dirt/fill shall be removed from the project in accordance with Specifications.

The Contractor, at his expense shall photo-document pre-construction conditions prior to starting excavating. After construction is completed, the Contractor shall photo-document the finished grade. The Contractor shall provide the City with said photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc). The Contractor shall keep a copy of the photos (either electronically or hard copy) and provide the City with electronic copies of the photos.

SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND

PLACEMENT OF BASE MATERIALS
301-1 SUBGRADE PREPARATION.
301-1.3 Relative Compaction. - Amend the second sentence of paragraph 1 as follows:
“When base material, curb, gutter, alley pavement, driveways, or sidewalks are to be placed on the subgrade material, the top 6 inches (150mm) of such subgrade material shall be compacted to a relative compaction of 95 percent.”
301-2.1 General. – Add the following paragraphs:

The contractor shall use ‘crushed aggregate base’ or ‘crushed miscellaneous base, fine graded’ as the base material. The use of ‘processed miscellaneous base,’ ‘select subbase,’ or ‘disintegrated granite’ shall not be used as base material.

The contractor may use ‘pulverized miscellaneous base’ (grindings) as part of the crushed base material. Said grindings shall be uncontaminated and placed in an even thickness as the lower course of crushed base material. Spreading and compacting shall comply with Sections 301-2.2 and 301-2.3.
301-2.3 Compacting. – Amend the second sentence of paragraph 3 as follows:
“Compaction in the excepted areas shall be as specified in 211-1 with each layer of compacted base material having a minimum relative compaction of 95 percent.” 301-2.4 Measurement and Payment. – Add the following paragraph:

Payment shall be made for cold-planing, storing, placing, and compacting reprocessed asphalt concrete pavement (grindings) as part of the crushed aggregate base (CAB) material. The volume of grindings placed shall be figured and a tonnage figure computed using 9.35 kg/m^3 (150 pounds Redlands Regular Meeting of 03-04-2025 942 of 1100
GC 44
per cubic foot). This tonnage figure shall be paid as part of the crushed aggregate base tonnage for this project.
301-7 FULL DEPTH RECLAMATION WITH MECHANICAL STABILIZATION (FDR25) 301-7.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 25 ksi.

The manufacture of the recycled base course shall be done in-place by pulverizing and blending the existing AC layer and base materials, if present. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.
301-7.2 Construction. The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two-inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of roots, weeds, wood, and construction debris. All grass and other vegetation shall be removed from the edge of the exiting pavement or lip of gutter pan to prevent contamination of the pulverized bituminous material during the milling operation.

Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulverized pavement section to the lines and grades matching existing and/or per plans and specifications.

Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.

Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.
301-7.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:

1. Clearing foreign matter including vegetation

2. Removing standing water

3. Referencing the profile and cross slope

4. Marking the proposed longitudinal cut lines on the existing pavement as follows:

4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way

4.2. Cut lines must indicate the sequence of the cuts

5. Referencing existing lane lines and striping layout
Redlands Regular Meeting of 03-04-2025 943 of 1100
GC 45
Final subgrade surface shall slope away from the street centerline to a maximum of 3% grade.

Pulverized asphalt material must be used as base material to meet new cross slope requirements.

Native sub-grade material may need to be hauled off to allow for the use of all pulverized base material. No additional compensation will be allowed for any sub-grade removal and haul-off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of material, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.
301-7.4 Spreading, Mixing, and Compacting. Do not use a heating device to soften the pavement. Remove any visible oversized materials in the pulverized roadbed mixture prior to shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.

According to the Section 301-2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of the road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.

The relative compaction of each layer of compacted base material shall not be less than 95 percent.

ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding. 301-7.5 Finishing. The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits. 301-8 FULL DEPTH RECLAMATION WITH CEMENT STABILIZATION (FDR-200) 301-8.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 200 ksi.

The manufacture of the recycled base course shall be done in-place by pulverizing and blending the existing AC layer and base materials, if present, and adding cement. Micro-cracking of the completed cement stabilized surface is required before HMA is to be placed directly on top of the cement treated surface, regardless of the AC thickness. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.

Redlands Regular Meeting of 03-04-2025 944 of 1100
GC 46
The cement content must be 2% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 6” FDR section. The cement content must be 3% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 9” FDR section. The cement content must be 4% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 12” FDR section. Cement must be Type II or Type V Portland cement specified in ASTM C 150/150M. 301-8.2 Construction. The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two-inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of grass and vegetation, and construction debris to prevent contamination of the pulverized materials. Mixing shall continue until, and at the speed of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials are achieved.

Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulverized pavement section to the lines and grades matching existing and/or per plans and specifications. Excess pulverized material shall consist of non-treated well mixed pulverized AC pavement and subgrade.

Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.

Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.
301-8.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:

1. Clearing foreign matter including vegetation

2. Removing standing water

3. Referencing the profile and cross slope

4. Marking the proposed longitudinal cut lines on the existing pavement as follows:

4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way

4.2. Cut lines must indicate the sequence of the cuts

5. Referencing existing lane lines and striping layout
Final pavement surface shall slope away from the street centerline to a maximum of 3% grade.

Pulverized material must be used as base material to meet new cross slope requirements. Native sub-grade material may need to be hauled off to allow for the use of all the pulverized base material. No additional compensation will be allowed for any sub-grade removal and haul-off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of material, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.

Redlands Regular Meeting of 03-04-2025 945 of 1100
GC 47
301-8.4 Spreading, Mixing, and Compacting. Do not use a heating device to soften the pavement. Remove any visible oversized materials in the pulverized roadbed mixture before shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.

Recycling shall be performed to the depth provided in the plans, while incorporating stabilizing agents, mineral filler, additional aggregate and water. Mixing shall continue until, and the speed of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials is achieved. Pre-cutting, grading and light compacting of the recycled material shall be performed prior to incorporation of the stabilizing. Spread cement uniformly over the full roadway surface width. Do not spread cement more than 30 minutes before mixing. Do not apply dry cement in windy conditions that will result in dust outside the FDR with cement area. The application rate must be the mix design rate or the ordered application rate in lb/sq yd ±

0.5 percent. The application rate of all stabilizing agents shall be continuously monitored. If the measured application rate falls outside the above tolerance, then the recycling operations shall be stopped and corrected before proceeding. Do not spread cement and aggregate before pulverizing.

Water must be injected through the pulverizing machine. The injection rate of mixing water must be sufficient to produce the FDR with cement material mixing moisture content. The water content of the stabilized material shall be monitored closely to ensure proper compaction. Mark where the center of the pulverizing drum stops. Start the following cut on this alignment at least 2 feet behind the mark. Before compacting, remove solids larger than 3 inches in any dimension by hand.

Immediately after pulverizing and mixing, compact FDR with cement to the minimum relative compaction. Do not allow more than 2 hours between final mixing of the pulverized material with cement and completion of initial compaction before trimming. During grading and final compaction add water to maintain the mixing moisture content as described in the mix design. Do not allow more than 2 hours to elapse from the time water is added to the aggregate and cement to completion of final compaction after trimming.

Longitudinal joints between adjacent stabilization passes shall be overlapped at least 4 inches.

Transverse joints between the recycling process shall be saw-cut, if necessary, to provide a vertical clean face to ensure proper compaction. Compaction of cementitious stabilizer begins within 20 minutes after mixing and achieving gradation and moisture requirements.

According to the Section 301-2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of the road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.

The relative compaction of each layer of compacted base material shall not be less than 95 percent.

ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding.

Redlands Regular Meeting of 03-04-2025 946 of 1100
GC 48
Construction joints shall have vertical faces and shall be made in thoroughly compacted material.

Additional mixture shall not be placed against the construction joint until the joint has been approved by the Engineer. The face of the cut joint shall be lean and free of deleterious material and shall be kept moist until the placing of the adjacent FDR with cement. 301-8.5 Finishing. Once the entire working width (full lane width plus effected shoulder width) has been stabilized, and only after primary compaction has been completed, the entire working width shall be graded to the required profile and cross-slope. Disturbance to the stabilized and primary compacted material shall be kept to a minimum during this grading and shaping operation.

The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits.

Immediately after compaction, apply water and roll with no vibration. The finished surface must be free of ruts, bump, indentations, segregation, raveling, and any loose material.

The completed cement treated subgrade shall be moist cured continuously until it is in a firm and unyielding condition. The cement treated subgrade shall be kept free from heavy traffic during the curing period or until the asphalt concrete surfacing is placed whichever is less, unless otherwise directed by the Engineer. Moisture curing shall be the only method of curing prior to microcracking.

Micro-cracking shall be performed with several vibratory roller passes 48 to 72 hours after finish grading to prevent severe, wide cracks from forming thus reduces the potential for reflective cracking through the HMA layer. Micro-cracking shall be performed before the application of asphaltic emulsion curing seal. After micro-cracking is complete additional moisture curing may be used. Any additional water required to achieve maximum density shall be applied by spraying the surface of the stabilized material with light applications. Care shall be taken so as not to overapply additional water to any areas of the stabilized material.

While open to traffic and before placing HMA, maintain the FDR with cement surface free of ruts, bumps, indentations, raveling, and segregation. If FDR with cement material is damaged, it shall be repaired by removing and replacing the entire depth of affected layers in the damaged area.

Feathering will not be permitted for repair of low areas.

Asphaltic emulsion curing seal must be applied on the completed cement treated base immediately before placing HMA. Asphaltic emulsion curing seal must comply with Caltrans Standard Section 94, Grade SS1 or CSS1. Dilute and thoroughly mix asphaltic emulsion for curing seal at a ratio of 1 part water to 1 part asphaltic emulsion. The water must no cause premature separation of the emulsion. Uniformly apply the diluted curing seal at a rate of 0.1 gal/yd2 of cement treated base surface.

Redlands Regular Meeting of 03-04-2025 947 of 1100
GC 49
SECTION 302 - ROADWAY SURFACING
302-4 SLURRY SEAL SURFACING.
302-4.3.1 General. – Add the following paragraphs:

All slurry mixing machines shall be equipped with a Fines Feeder for the adding of cement or granular Aluminum Sulfate.

Prior to the beginning of slurry operations, the Contractor shall furnish, at no cost to the City, current licensed weigh master’s certificates indicating the net weight capacity of the aggregate bin.

The Contractor shall provide a drive upon scale at the project site or an alternate site approved by the City. The drive on scale shall show the net weight of the aggregate bin on each slurry machine before the machine and product will be approved for applying slurry on the project.

All slurry machines are to carry, at all times, a calibrated emulsion measuring stick. The emulsion measuring stick is to be calibrated in 10-gallon increments to the slurry machine it is used on.

Emulsion measuring sticks from other slurry machines will not be allowed to measure the gallons of emulsions on the slurry machines they were not calibrated to. The emulsion measuring stick is to have the slurry machine number or identification permanently marked on the stick. The gallons of emulsion are to be measured with a calibrated emulsion measuring stick and recorded before leaving and after returning to materials site. Use of a slurry machine will not be allowed if it does not have a calibrated emulsion measuring stick.

The Contractor shall furnish prior commencing work, a calibrated stick in 10-gallon increments to measure the oil in the trailer storage tanks in gallons. The measuring stick shall be calibrated to the trailer storage tank it is used on. The inspector shall check the oil in each load “in and out” and in the storage tanks at the beginning and end of each day to determine the amount of emulsion used for that day. Emulsion is not to be transferred from delivery tank to on-site storage tank before the City performs the sieve analysis on the emulsion. Aggregate used in the slurry shall not exceed a moisture content of four percent (4%) by weight of dry aggregate.

Contractor may not schedule more than 150 tons of slurry to be placed per day. Slurry may not be applied at more than 150 feet per minute.

The Contractor shall provide a self-propelled 10 ton pneumatic roller with a tire pressure of 50 PSI and equipped with a water spray system. The Contractor shall roll the required streets the same day they are slurried. The Contractor will be responsible for proper scheduling of the work such that the rolling can be properly done within the given time constraint. Failure to comply shall result in a $250.00/calendar day liquidated damage being assessed per incident. The cost of furnishing the roller and operator shall be included in the price paid for slurry seal.

The Contractor is hereby advised that City streets, parking lots, or other City-approved property will not be allowed as a site for stockpiling and batching. Arrangements for an acceptable site shall be the sole responsibility of the Contractor.

The Contractor shall sweep any raveled material on the street one (1) week after the initial placement. If the Engineer determines the raveling is excessive, the frequency of sweeping shall Redlands Regular Meeting of 03-04-2025 948 of 1100
GC 50
be adjusted to the field conditions of the raveling. If raveling continues within two (2) weeks of the initial placement, the street shall be swept and reslurried with a Type I mixtures (Local Streets) or a Type II (Arterial/Collector Streets) at no cost to the City. Raveling can be identified by the presence of “black pebbles” in the gutter.

The Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least fourteen (14) calendar days prior to slurrying. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to slurrying. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for slurry seal.

Longitudinal joints must correspond with lane lines. You may request other longitudinal joint patterns if they do not adversely affect the slurry seal. Spread slurry seal in full lane widths. Do not overlap slurry seal between adjacent lanes more than 3 inches. Use a material, such as building paper at transverse joints and over previously placed slurry seal to prevent double placement.

Remove the material after use. Use hand tools to remove spillage.

Full compensation for developing a water supply, for furnishing and placing all water required for work done in the Contract, including extra work shall be included in the prices paid for the various items of work requiring water; and no separate payment will be made therefore. The Contractor shall supply the City with licensed weighmaster’s certificates of weight for all delivered aggregates to the job during the course of each day. Aggregate shall be delivered to the project only in the presence of a City representative. The Contractor shall also present weighmaster certificates for the amount of such aggregate remaining at the completion of the project at no cost to the City.

Payment shall be determined by the amount that is physically placed, which cannot exceed the amount that is delivered to the job site with the certified weighmaster tickets. There shall be not outside work done utilizing materials from the tanks or stockpiles stored for the City’s Contract.

Prior to storing aggregate on private property, the Contractor shall submit to the Engineer written permission from the property owner for such stockpiling.

Precautions shall be taken to ensure that stockpiles do not become contaminated with oversized rock, clay, silt, or excessive amounts of moisture. The stockpiles shall be kept in areas that drain readily. Segregation of the aggregate will not be permitted.

The Contactor shall protect the wet slurry from traffic at all times and if damaged or defaced, the Contractor shall repair said damage at no additional cost to the City.

The placement of slurry seal may be suspended with the concurrence of the Engineer due to unsuitable weather, temperature conditions, or other conditions that are considered unfavorable for the prosecution of the work. The Contractor shall immediately comply with the order of suspension by the Engineer, and work shall not be resumed until authorized by the Engineer.

Redlands Regular Meeting of 03-04-2025 949 of 1100
GC 51
302-4.8 Spreading and Application. - Add the following paragraphs:

Prior to applying slurry seal, the Contractor shall clean, to the satisfaction of the Engineer, the street surface with a power sweeper, remove all R.P.M.’s, abrasive grind or sandblast completely all lane lines, street legends, crosswalks or other painted or thermoplastic surfaces. This is necessary to provide a good bonding surface for the slurry seal, as well as eliminate “ghosting” of the old striping and markings as the new slurry wears off over time.

It is anticipated that nuisance water, such as storm water runoff and irrigation water, will run in and across the right-of-way at various time throughout the period of construction. It shall be the responsibility of the Contractor, at their own expense, to provide for and protect the work from such water. In addition, the Contactor’s responsibility shall include handling nuisance waters such that their operations do not cause them to damage existing improvements or properties adjacent to or near the site of work.

Slurry shall not be applied when the atmospheric temperature is less than 65oF (18oC).

The application of slurry shall not commence until after 8:00 a.m., and shall conclude at 1:30 p.m. unless other authorized by the Engineer. The slurry shall be sufficiently cured to be open to traffic by 4:00 p.m. The portions of streets to be slurried shall be closed from the time the application begins until the mixture as achieved sufficient set to be opened to traffic.

The slurry shall be applied in such a manner that no ripples or waves exist. If ripples or waves occur in the slurry during the application, the work shall cease and the Contractor shall correct the situation. The Contractor may use a drag to knock down ridges. If ripples or waves are not corrected to the Engineer’s satisfaction, the street shall be reslurried at the Contractor’s expense.

The Contractor shall, at the direction of the Engineer, repair the reseal to the entire street, or complete section thereof, as determined by the Engineer, which have not been sealed properly (includes areas that have failed to meet yield and mix design specifications) and completely. No compensation will be provided for slurry seal used in repair and reseal work.

Each slurry crew shall be composed, at a minimum, of a coordinator at the project site at all times, a competent quick-set mixing man, a competent driver, two squeegee men, and sufficient laborers for any handiwork and cleanup.

Surface oil and grease shall be removed or sealed with shellac or an equivalent material approved by the City before the application of the slurry seal. Full compensation for surface oil and grease removal shall be considered as included in the unit cost for slurry seal.

The Contractor shall roll all cul-de-sacs (the last 250’ minimum), the last 250’ of dead-end streets and knuckle curves. Full compensation for rolling the slurry shall be considered as include in the unit cost for slurry seal.

During slurry seal operations, it shall be the Contractor’s responsibility to place protective covering over, or to otherwise avoid slurry seal coating of manholes, utility covers, pavement markers (reflective and non-reflective), concrete gutters, concrete cross gutters, and drainage Redlands Regular Meeting of 03-04-2025 950 of 1100
GC 52
facilities, survey monuments and remove said covering and/for slurry seal coating after slurry sealing has been completed.

The start and finish of slurry application shall be a straight line which, unless otherwise approved by the Engineer, shall be obtained by laying a strip of building paper or other material approved by the Engineer on the pavement surface. After application of slurry, the paper is to be removed leaving a straight edge. The entire street surface area shall be sealed the same day. 302-4.8.1 Crack Sealing and Filling. Crack sealing shall be performed prior to the Slurry Seal application. Pavement cracks 1/4" wide and larger shall be sealed. Pavement cracks 1/8" to 1" wide shall be cleared of all loose particles of dust, dirt and laitance with oil-free compressed air immediately preceding the sealing operation. Cracks shall be routed out as necessary to provide a reservoir for the sealer that will have a depth of l" to 1 1/2".

The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).

The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203-6.4 Type E (Extra Fine).

A wand and nozzle type application shall be used to fill all cracks with crack sealing material.

Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or concrete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.

The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.
302-5 ASPHALT CONCRETE PAVEMENT.
302-5.1 General. - Add the following paragraphs:

Asphalt concrete pavement structural sections equal to or greater than 3 inches (76 mm) in thickness shall be installed in two lifts. Base course aggregate material size shall be ¾ inch (19 mm) and cap course aggregate material size shall be ½ inch (13 mm). All pavement shall be placed over 4 inches of crushed aggregate base, unless compacted to 95% relative compaction.

All valves within project limits in the public right-of-way shall be raised to finish grade as a part of this work. The Contractor shall furnish and install new can or slip can materials as necessary.

If new water valve lids are necessary, they shall be supplied by the Municipal Utilities and Redlands Regular Meeting of 03-04-2025 951 of 1100
GC 53
Engineering Department. All valve can lids within the project limits in the public right-of-way shall be painted the appropriate color for the utility they represent (ie. Water - Blue, Gas - Yellow, Fire – Red, etc.).
302-5.2 Timeline of Paving Operations.

All paving operations shall follow the timeline and requirements shown below unless otherwise approved by the City:

PAVING TIMELINE

DESCRIPTION OF WORK

TIME PERIOD
WEEK 1
(DAY 1-7)
WEEK 2
(DAY 8-14)
WEEK 3
(DAY 15-21)
WEEK 4
(DAY 22-28)
PAVING (START TO FINISH) (1)
CURE PERIOD (2)
MANHOLE ADJUST TO GRADE (3)
STRIPING & PAVEMENT MARKINGS (4)
TRAFFIC LOOPS (5)
NO PARKING SIGNS ALLOWED (6)
Note: All time periods shown above are the maximum amount of allowable time for each activity.

This timeline does not apply to the installation or repair of curb and gutter, ac dikes, sidewalks, cross gutters, curb ramps, driveway approaches or truncated domes. (1) In no case shall any street segment remain unpaved longer than three calendar days if no other work activity is being performed on that street segment. Any deviation from the timeline shall result in a penalty assessment of $1,000 per calendar day. (2) No work except cat tracking of proposed striping is allowed during this period; therefore “No Parking Signs” shall not be installed during this activity. (3) Once each manhole is exposed, all associated work to adjust it to grade must be completed within 48 hours. This shall include all adjustments of manholes, vaults, valve cans, etc. as required by the Contract.
(4) All cat tracking and approval of proposed striping shall occur during the cure period. (5) Traffic loops must be installed after the approval of striping layout and prior to the installation of thermoplastic striping and pavement markings. (6) “No Parking Signs” shall be installed per Section 7-19 of these specifications. 302-5.4 Tack Coat. – Delete and replace with the following:

If the asphalt concrete pavement is being constructed directly upon an existing hard-surfaced pavement, a tack coat of High Performance Seal (HPS) No-Track Tack at an approximate rate of Redlands Regular Meeting of 03-04-2025 952 of 1100
GC 54

0.05 gallon per square yard shall be uniformly applied upon the existing pavement preceding the placement of asphalt concrete. The surface shall be free of water, foreign material, or dust when the tack coat is applied. To minimize public inconvenience, no greater area shall be treated in any one day than is planned to be covered by asphalt concrete during the same day, unless otherwise approved by the Engineer.
302-5.5 Distribution and Spreading. – Add the following:

Unless otherwise permitted by the Engineer, the top layer of asphalt concrete for shoulders, tapers, transitions, road connections, private drives, curve widening, turnouts, left-turn pockets, and other such areas, shall not be spread before the top layer of asphalt concrete for the adjoining through lane has been spread and compacted. At locations where the number of lanes are changed, the top layer for the through lanes shall be paved first. Tracks or wheels of spreading equipment shall not be operated on the top layer of asphalt concrete in any area until final compaction has been completed or unless directed by the Engineer.

All screed extensions for paving machines shall be provided with a tamper, roller, or other suitable compacting devices.

Asphalt pavers shall be equipped with automatic screed controls and a sensing device or devices.

Automatic grade and slope control shall be used for overlays.

All joints shall be sealed after rolling.

When placing asphalt concrete to the lines and grades noted in the plans or as approved by the Engineer, the automatic screed controls shall control the longitudinal grade and transverse slope of the screed. Grade and slope references shall be furnished, installed, and maintained by the Contractor. The Contractor shall use a ski device, the minimum length of the ski device shall be 30 ft. The ski device shall be a rigid one-piece unit and the entire length shall be utilized in activating the sensor. The Contractor may use a laser to control the screed.

When placing the initial mat of asphalt concrete on existing pavement, the end of the screed nearest the center line shall be controlled by a sensor activated by a ski device not less than 30 ft long.

The end of the screed farthest from center line shall be controlled by an automatic transverse slope device set to reproduce the cross slope approved by the Engineer.

When paving contiguously with previously placed mats, the end of the screed adjacent to the previously placed mat shall be controlled by a sensor that responds to the grade of the previously placed mat and will reproduce the grade in the new mat within a 0.01 ft. tolerance. The end of the screed farthest from the previously placed mat shall be controlled in the same manner as when placing the initial mat.

Should the automatic screed controls fail to operate properly during any day's work, the Contractor may use manual control of the spreading equipment for the remainder of that day; however, the equipment shall be corrected or replaced with alternative automatically controlled equipment conforming to the requirements in this section before starting the next day's work.

Redlands Regular Meeting of 03-04-2025 953 of 1100
GC 55
Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Subsection 302-

5.6.2 - Density and Smoothness, of the Standard Specifications, the paving operation shall be discontinued and the Contractor shall modify his equipment or furnish substitute equipment. A drop-off of more than 0.15 ft will not be allowed at anytime between adjacent lanes open to public traffic.

The Contractor shall schedule his paving operations such that each layer of asphalt concrete is placed on all contiguous lanes of a traveled way each work shift. At the end of each work shift, the distance between the ends of the layers of asphalt concrete on adjacent lanes shall not be greater than 10 ft. nor less than 5 ft. Additional asphalt concrete shall be placed along the transverse edge at the end of each lane and along the exposed longitudinal edges between adjacent lanes, hand raked, and compacted to form temporary conforms. Kraft paper, or other approved bond breaker, may be placed under the conform tapers to facilitate the removal of the taper when paving operations resume.
302-5.6.1 General. - Add the following paragraph:

All asphalt concrete pavement abutting portland cement concrete gutters shall match and be flush with the gutter lip when finish rolling is complete.
302-5.6.2 – Density and Smoothness. – Delete and replace with the following:

The completed surfacing shall be thoroughly compacted, smooth and free from ruts, humps, depressions or irregularities. Any ridges, indentations or other objectionable marks left in the surface of the asphalt concrete shall be eliminated by rolling or other means. The use of any equipment that leaves humps, ridges, irregularities or other objectionable marks in the asphalt concrete shall be discontinued, and acceptable equipment shall be furnished by the Contractor.

The finished surface shall meet the following smoothness criteria:
• When a 12 foot long straightedge is laid on the finished surface parallel to the centerline of the roadway, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, except at changes in grade,
• When a 12 foot long straightedge is laid on the finished surface perpendicular to the centerline of the roadway and extends from edge to edge of a traffic lane, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, except at changes in grade.

If the top layer of pavement does not comply with the smoothness specifications shown, remove and replace the entire section or complete a grind and overlay of 1.5 inches or 3 times the aggregate size, whichever is greater. Grind and overlay will be considered as a repair method only when the thickness of the asphalt pavement section is greater than 1.5 inches following the required grinding. Corrected section shall be rectangular to the nearest pavement edge or lane line and to a crosswalk, concrete spandrel or other limits approved by the City. Do not begin corrective actions until the method and limit of correction is authorized by the City. If the tolerances cannot be achieved by the methods described above, the contractor must re-pave the street section, in kind, at their own expenses.

Redlands Regular Meeting of 03-04-2025 954 of 1100
GC 56
The compaction after rolling shall be a minimum of 91 percent and a maximum of 97 percent of the density obtained on samples compacted with the California Kneading Compactor per California Test 304. Cores will be taken randomly by the City for laboratory testing per California Test 308, Method A at a frequency of three per lot. A lot shall consist of a maximum of 3,000 square yards of asphalt concrete and will be identified in the field by the City. The cores will be averaged to determine the percent of maximum theoretical density, as determined by ASTM D2041, per lot to the nearest tenth of a percent.

Reduced payment factors for percent of maximum theoretical density will be per the following table, and will be applied to the entire lot sampled.

Reduced Payment Factors for Percent of Maximum Theoretical Density Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor
Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor

91.0 0.0000 97.0 0.0000

90.9 0.0125 97.1 0.0125

90.8 0.0250 97.2 0.0250

90.7 0.0375 97.3 0.0375

90.6 0.0500 97.4 0.0500

90.5 0.0625 97.5 0.0625

90.4 0.0750 97.6 0.0750

90.3 0.0875 97.7 0.0875

90.2 0.1000 97.8 0.1000

90.1 0.1125 97.9 0.1125

90.0 0.1250 98.0 0.1250

89.9 0.1375 98.1 0.1375

89.8 0.1500 98.2 0.1500

89.7 0.1625 98.3 0.1625

89.6 0.1750 98.4 0.1750

89.5 0.1875 98.5 0.1875

89.4 0.2000 98.6 0.2000

89.3 0.2125 98.7 0.2125

89.2 0.2250 98.8 0.2250

89.1 0.2375 98.9 0.2375

89.0 0.2500 99.0 0.2500
< 89.0 Remove and replace > 99.0 Remove and replace
In addition to the reduced payment factors below, all costs associated with the testing of the lot which resulted in values outside of the 91-97 percent range, will be withheld from the final payment due to the Contractor.

Following completion of the testing by the City, the core locations within the asphalt pavement shall be repaired by the Contractor.

Redlands Regular Meeting of 03-04-2025 955 of 1100
GC 57
302-5.6.3 Tracking. All areas receiving asphalt pavement shall be protected from tracking onto adjacent areas. Do not allow traffic on new asphalt pavement until its mid-depth temperature is below 140º Fahrenheit to minimize the tracking.

A rock dust blotter coat per Section 302-9.7 or a sand coat at a rate of 1-2 pounds per square yard shall be applied to the compacted surface for all areas where tracking is a concern. The application of tracking prevention measures shall be determined by the Contractor.

A haul route for all paving operations shall be reviewed and approved by the City prior to the start of any construction activity. No deviations from the approved haul route shall occur unless approved in writing from the City.

All tracking onto adjacent streets, striping or pavement markings shall be the responsibility of the Contractor. All striping and pavement markings shall be removed and replaced in kind by sandblasting. All tracking onto roadway surfaces may require the use of a street sweeper to the satisfaction of the City.
302-5.7 Joints. – Add the following:

Longitudinal joints shall be trimmed to a vertical face and to a neat line if the edges of the previously laid surfacing are, in the opinion of the Engineer, in such condition that the quality of the completed joint will be affected. Longitudinal and transverse joints shall be tested with a 12’ straightedge and shall be cut back as required to conform to the provisions in Subsection 302-5.6.2 Density and Smoothness for surface smoothness. Connections to existing surfacing shall be feathered to conform to the provisions for smoothness.

Longitudinal joints in the top layer shall correspond with the edges of proposed lane striping.

Longitudinal joints in all other layers shall be offset not less than 0.5' alternately each side of the edges of traffic lanes.

All feathered joints shall be sealed after rolling.
302-5.9 Measurement and Payment. – Add the following:

Reduced payment factors per 302-5.6.2 will be applied to the Contract Unit Price for lots with a Maximum Theoretical Density less than 91.0 and greater than 97.0 percent. 302-5.10 Hot Asphalt Leveling Course. Areas to receive the Hot Asphalt Concrete Leveling Course shall be determined and defined by the project manager and inspector, and identified to the Contractor in the field. Mix for hot Asphalt Concrete Leveling Course shall be 1/2 inch aggregate, C2, as defined in Section 203-6.4.3.

Areas to receive hot asphalt concrete leveling course shall be areas located near or adjacent to existing curbs and/or gutters that are potholed, or have the lip of gutter higher than the adjacent roadway. Potholes, large cracks, or ruts shall be filled to the surrounding grade elevation and compacted. Hot Asphalt Concrete Leveling Course shall be completed prior to the placement of Type II Slurry Seal, ARAM or resurfacing.

Redlands Regular Meeting of 03-04-2025 956 of 1100
GC 58
Prior to placement of asphalt concrete, the surface shall be cleaned and all debris and deleterious materials shall be removed. A tack coat meeting the material and application requirements of Section 302-5.4 Tack Coat, shall be applied prior to placement of hot mix asphalt concrete. 302-5.11 Asphalt Pavement Crack Sealing and Filling. Crack sealing shall only be performed as a repair method for conventional hot mix asphalt pavement (HMA) and not installed at project locations which will have asphalt rubber hot mix (ARHM) used as the overlay material. Crack sealing shall be performed after milling of existing asphalt surface and prior to any leveling course, if necessary.

Right after milling of existing asphalt and before crack sealing or filling, Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least seven (7) calendar days prior to paving. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to paving. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for paving.

The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).

The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203-6.4 Type E (Extra Fine).

A wand and nozzle type application shall be used to fill all cracks with crack sealing material.

Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or concrete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.

The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.

SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION
303-1 CONCRETE STRUCTURES.
303-1.1 General. - Delete the first sentence of paragraph 1 and replace with the following:
“Concrete bridges, culverts, catch basins, retaining walls, abutments, piers, footings, foundations, drainage inlets, head walls, end walls, wing walls, junction structures, transition structures, Redlands Regular Meeting of 03-04-2025 957 of 1100
GC 59
manholes, and other similar types of portland cement concrete structures shall be constructed to the lines and grades in conformity with the Plans and Specifications. 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.
303-5.1.1 General. - Replace the last paragraph with the following:

No PCC shall be ordered and/or placed until the forms and subgrade have been inspected and approved by the Engineer in the field.

All pull boxes, water meter boxes, and water valve covers shall be adjusted to proposed finish grade and approved by the Engineer in the field prior to placement of the PCC.

The Contractor shall barricade and protect placed PCC from all damage, marks, mars, and/or graffiti. Any PCC damaged, defaced, discolored, or defective shall be replaced at the Contractor's expense.

When removals of curb and/or sidewalk are located at curb return, the Contractor shall install access ramps. The Contractor is to construct all access ramps in accordance with American Disability Act (ADA) Standards/California Code of Regulations Title 24 – Accessibility Regulations. If the ramps constructed by the Contractor are found to be in non-compliance with ADA Standards, the Contractor will be required to remove and replace the ramps to ADA Standards at the Contractor's expense.
303-5.1.2 Drainage Outlets Through Curb. - Add the following paragraph:

Coring shall be required for all drains through existing curbs. 303-5.1.3 Driveway Entrances. – Replace the last paragraph with the following:

Driveway approaches where required, shall be 150 mm (6") thick for single-family residential area, and 200 mm (8") thick for commercial driveway approaches. 303-5.1.4 Walk. The back of sidewalk shall be 2 inches from the street Right-of-Way line unless otherwise specified by the Engineer.

Included in the price of sidewalk construction are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished sidewalk surface, as a result of grade differentials from existing ground surface to proposed sidewalk surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times. 303-5.1.5 Access Ramps. Construction of curb ramps shall conform to the Type and Case appropriate for the condition, as specified on the plans and as shown within the 2012 Standard Plans for Public Works Construction, Plan 111-5. The Contractor shall be responsible to layout the proposed access ramp to comply with the maximum slope indicated on the plans or Standard Plan 111-5. The maximum slope for the ramp shall not be exceeded unless otherwise approved in Redlands Regular Meeting of 03-04-2025 958 of 1100
GC 60
writing by the Engineer. The Contractor shall remove and replace access ramps deemed noncompliant with the plans or Standard Plan 111-5.

For proposed locations adjacent to a cross gutter spandrel, sawcuts along the radius of the curb will not be allowed. The spandrel shall be replaced from expansion joint to expansion joint to the extents of the curb removal. For proposed locations adjacent to curb and gutter, sawcuts along the flowline of the curb will not be allowed. The entire curb and gutter shall be replaced from expansion joint to expansion joint as required. Sawcuts at locations other than the expansion joint will not be allowed unless approved by the Engineer. Curb cuts of the existing curb will not be permitted for installation of proposed ramp. Any deviation from these requirements will result in rejection of all work at this location and shall not be included in progress payment requests until corrected, per direction from the Engineer.

The Contractor shall verify the extents of sawcut and removal for each access ramp taking into account the maximum slope and transition area required. It shall be the Contractor’s responsibility to identify required removal limits, set concrete forms and verify maximum slopes are not exceeded. The Engineer shall be present to verify the concrete forms prior to the placement of the concrete at each location, however this does not alleviate the responsibility of the accuracy of forms or slopes of the access ramp from the Contractor.

Included in the price of access ramps are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished ramp surface, as a result of grade differentials from existing ground surface to proposed ramp surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times.

Access Ramps shall have truncated domes installed in accordance with standard plans and specifications. Truncated domes on new access ramps shall be Armor-Tile, Cast in Place System, or approved equal. Truncated domes installed on existing surfaces shall be Safety Sted TD, or approved equal. Truncated dome panels shall be 36”x48”, inline configuration, with a spacing of

2.35” on center, and Federal Yellow in color.

The access ramp work shall include all related adjustments of pull boxes, pull box covers, signs, and protection of any underground utilities within the work area. The removal and replacement of up to 5 linear feet of sidewalk on each side of the access ramp shall be included within the cost of the access ramp. The removal and replacement of the sidewalk will allow for transition from the top of ramp to adjacent sidewalk and will be utilized as necessary. 303-5.4.3 Weakened Plane Joints, (a) General. - Add the following paragraph:

All weakened plane joints shall be spaced at a maximum of 3.05 m (10') feet for curbs, gutters, and sidewalks. Scoring lines shall conform to those prevailing in the area and be uniform in spacing.
303-5.5.2 Curb. - Replace the first paragraph with the following:

Redlands Regular Meeting of 03-04-2025 959 of 1100
GC 61
PCC for curb and gutter shall be placed within three working days from removal of the existing PCC curb and gutter. The curb and gutter surface shall not vary more than 3 mm (0.01') from a 3 m (10') straightedge except at the grade changes. Prior to the removal of the forms, the surface shall be finished true to grade by means of a straightedge float of not less than 3 m (10') in length, and operated longitudinally over the surface of the concrete. Form clamps shall be constructed so as not to interfere with the operation of the float. The form on the front of the curbs shall not be removed less than one (1) hour, nor more than six (6) hours after the concrete has been placed. In no event shall forms be removed while the concrete is sufficiently plastic to slump. The top and face of the finished curb shall be true and straight, and top surface of curbs shall be of uniform width, free from humps, sags, blemishes, or other irregularities. 303-5.5.3 Walk. - Add the following paragraphs:

The sidewalk surface shall not vary more than 5 mm (0.02') from the 3m (10') straightedge except at grade changes, and the finished surface shall be free from humps, sags, blemishes or other irregularities. All sidewalks shall be a minimum of 100 mm (4") thick, except at driveways where the sidewalks shall be a minimum of 150 mm (6") thick for single family residential areas and 200 mm (8") thick for all other areas.
303-5.6 Curing. - Add the following paragraph:

Curing compound shall be translucent with red fugitive dye, Type 1, in accordance with Section 201-4 Concrete Curing Compound, of the Standard Specifications. 303-5.7 Repairs and Replacements. - Add the following paragraphs:

In order to minimize vandalism damage to the finished PCC surfaces, the Contractor shall plan his work so that no PCC is poured after 1:00 p.m., unless otherwise authorized by the Engineer in the field.

The Contractor shall barricade and protect placed Portland Cement Concrete from all damages, marks, mars, and/or graffiti. Any Portland Cement Concrete damaged, defaced, discolored, or defective shall be replaced to the satisfaction of the Engineer at the Contractor's expense, and no additional time will be allowed.

Grading, patching, or other remedies to correct the situation will not be accepted unless in the opinion of the Engineer the vandalized area is so small that it does not warrant replacement.

Concrete replacement areas shall be from score mark or control joint to score mark or control joint, and full width of the sidewalk. All replacement areas shall be saw cut. 303-5.8 Backfilling and Cleanup. - Add the following paragraph:

A minimum of 300mm (12”) wide full depth asphalt concrete pavement repair patch and an 450mm (18”) wide 1-1/2” deep grind outside of the trench width is required when cross gutter, spandrel, driveways, curb and gutter is placed adjacent to existing asphalt concrete pavement. The asphalt concrete pavement repair patch shall be placed within two (2) working days after the cross gutters, spandrels, driveways, curb and gutter are replaced. The asphalt concrete pavement shall be sawcut. All work shall be in accordance with the General Permit Conditions and Trench Specifications, latest edition.

Redlands Regular Meeting of 03-04-2025 960 of 1100
GC 62
SECTION 304 - METAL FABRICATION AND CONSTRUCTION
304-3 CHAIN LINK FENCE.
304-3.4 Measurement and Payment. - Delete paragraph 1 and replace with:

Chain link fence will be measured along the horizontal projection line of the completed fence, deducting the widths of gates and openings.

SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS
314-1 GENERAL. - Add the following paragraphs:

To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during all striping operations. Refer to Section 7-8.6.

Each storm drain catch basin or storm drain inlet box shall be marked “NO DUMPING - FLOWS TO CREEK.” Two coats of paint are required. Stencil shall match City’s stencil. Paint and painting shall comply with the specifications.

All street resurfacing work shall include installing fire hydrant pavement markers at all fire hydrant location, whether the pavement markers were existing or not. The pavement markers shall be Type I – Two-Way Blue Retroreflective per Section 214-6 of the Specifications and installed per City’s detail drawing No. 102-0. All work associated with the installation of all new, or replacement of existing, fire hydrant pavement markers shall be included as noted within the specifications. 314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.
314-4.1 General. – Add the following paragraphs:

During construction, if traffic legends or lane striping are removed or paved-over for any reason, they shall be replaced immediately with temporary traffic legends or lane striping as directed by the City, and the Contractor shall place permanent traffic legends or lane striping at the end of the job or on completion of final paving. When permanent items are placed, they shall be complete markings, legends, or striping i.e.: if limit lines are disturbed, they shall be replaced to centerline or from curb to curb, whichever was existing; if a letter in a word is removed or covered, the entire word shall be replaced; and lane striping shall extend 75 feet beyond construction limits. All replacement markings, legends, or striping required to be replaced beyond the contract limits shown shall be at the cost of the Contractor and shall meet City standards. If existing striping or legends are to be removed on existing surfaces, they shall be sandblasted. Painting over striping or legends in lieu of removal will not be permitted. Pavement striping shall comply with the applicable provisions of Sections 214 and 314 of the Standard Specifications.

Where side streets with existing striping, markings and markers are encountered, striping, markings and markers shall be repainted and replaced for a minimum distance of 15 m (50 feet) from the crosswalk, stop bar or limit line.

Redlands Regular Meeting of 03-04-2025 961 of 1100
GC 63
314-4.2 Control of Alignment and Layout.
314-4.2.1 General. - Delete and replace with the following:

The Contractor will be responsible for all layout of all striping. All striping, markings and markers shall be reinstalled in their existing locations unless otherwise shown on the plans. The Contractor shall be responsible to take appropriate measures and record the existing locations.

The Contractor shall verify all dimensions in the field prior to installation of pavement striping/marking layout (Cat-Track). Should field measurements differ from the plan, the Contractor shall immediately notify City staff. No Cat-Track marks shall be placed until discrepancies are resolved.

Cat-Track must be approved by City staff prior to the installation of permanent pavement striping/marking. Contractor shall notify City staff a minimum of 24 hours prior to installation of permanent pavement striping/marking to allow for inspection and approval. If approval of CatTrack is not obtained by the Contractor, all work required to correct the striping/marking will be at the expense of the Contractor
Cat-Track marks shall be made in chalk. Paint for the purpose of Cat-Track is prohibited. If paint is used, the Contractor must remove the paint without damaging or visually deforming the pavement surface. If damage or visual deformity within the removal area occurs, in the opinion of City staff, the Contractor shall grind and overlay the entire segment with no additional compensation. The area of the grind and overlay shall be as required by City staff and shall be a minimum of 0.10’ thickness.

All visible Cat-Track markings after the installation of the permanent striping/marking shall be removed without damage or visual deformity to the pavement surface. Any damage or visual deformity to the pavement shall be remedied as noted above. 314-4.3.5 Application. - Amend the first sentence in paragraph 8 as follows:
“Glass beads shall be applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”
314-6 GREEN BIKE LANE. Green bike lanes shall be installed per plan and conform to the technical specifications included within the contract documents and shall be Streetbond CL or approved equal.

Redlands Regular Meeting of 03-04-2025 962 of 1100
GC 64

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 963 of 1100

GENERAL REQUIREMENTS
Redlands Regular Meeting of 03-04-2025 964 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 965 of 1100
COORDINATION OF WORK, PERMITS, AND REGULATIONS 01110-1
SECTION 01110 COORDINATION OF WORK, PERMITS, AND REGULATIONS A. Permits

1. The following permits for the permanent work shall been obtained by the contractor prior to start of work:

No Fee Encroachment Permit – City of Redlands

2. The permits contain requirements which affect the cost of project work and some permanent permits require supplementary work permits and fees to execute construction such as Worker’s Compensation and Liability Insurance, Business Permits and Contractor’s License.

Comply with the permit requirements and obtain and pay the fees involved with the supplementary work permits.

B. Timing

PAVING SCHEDULE

DESCRIPTION OF WORK CONSECUTIVE
WEEK 1 WEEK 2

STREET PAVING (START TO

FINISH)

TRAFFIC LOOPS

STRIPING & PAVEMENT

MARKINGS
NOTE: PATCH WORK PERFORMED IS EXPECTED TO ADHERE TO
THE SCHEDULING LAYOUT AS SHOWN. ANY DEVIATION

FROM THE ABOVE TIMELINE BY CONTRACTOR SHALL
RESULT IN A PENALTY ASSESSMENT OF $500.00 PER
CALENDAR DAY.

END OF SECTION
Redlands Regular Meeting of 03-04-2025 966 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 967 of 1100
DESCRIPTION OF WORK 01112-1

SECTION 01112 DESCRIPTION OF WORK

PART ONE -- GENERAL

1.1 SUMMARY
A. The work to be done under this Contract includes the furnishing of project management, labor, materials, tools and equipment for the construction of the 2025 Citywide Pavement Repair for Water Utilities for the City of Redlands, all in accordance with the Contract Documents.

1.2 GENERAL SCOPE OF WORK
A. Work In This Contract: Work in this Contract includes all labor, materials and equipment necessary for construction of the 2025 Citywide Pavement Repair for Water Utilities as noted on the Contract Documents and is summarized as follows:

1. The Work shall consist of furnishing and installing all pavement, traffic loops, and striping; all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all pavement removal and disposal; compacting; protecting in place or removing and replacing all existing utilities, replacing all asphalt concrete pavement including asphalt concrete overlays; pavement striping and restriping; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions.

2. This project is intended to provide full workdays of operation, at least 15 patches a week. City shall provide list of existing temporary patches at the preconstruction meeting and subsequent weekly meetings for the pavement repair work to be completed until funds are exhausted.

3. All patches shall be per the City of Redlands MUED General Permit Conditions and Trench Specifications as seen in Appendix D.

END OF SECTION
Redlands Regular Meeting of 03-04-2025 968 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 969 of 1100
MEASUREMENT AND PAYMENT 01200-1
SECTION 01200 MEASUREMENT AND PAYMENT
A. Work Listed in the Schedule of Work Items

1. Work under this contract will be paid on a unit price or lump-sum basis as outlined on the Bid Form for the quantity of work installed.

2. The unit prices and lump-sum prices include full compensation for furnishing the labor, materials, tools, and equipment and doing all the work involved to complete the work included in the contract documents.

3. The application for payment will be for a specific item based on the percentage completed or quantity installed. The percentage complete will be based on the value of the partially completed work relative to the value of the item when entirely completed and ready for service.

4. A retention of five percent (5%) of the value of work completed will be withheld from progress payments. This retention amount will remain constant throughout the contract period, and will not be payable until the expiration of thirty-five (35) days after the recordation of the Notice of Completion.

B. Work Not Listed in the Schedule of Work Items
The General Conditions and items in the Special Provisions, general requirements, and specifications which are not listed in the schedule of work items of the bid form are, in general, applicable to more than one listed work item, and no separate work item is provided therefor. Include the cost of work not listed but necessary to complete the project designated in the contract documents in the various listed work items of the bid form. The bids for the work are intended to establish a total cost for the work in its entirety. Should the Contractor feel that the cost for the work has not been established by specific items in the bid form, include the cost for that work in some related bid item so that the proposal for the project reflects the total cost for completing the work in its entirety.

C. Bid Items

1. Sawcut & remove temporary asphalt & replace with asphalt concrete, Bid Item 1:

Payment for removal and replacement of pavement shall be made at the contract square foot price and shall constitute full compensation for all labor, material, equipment, and incidentals required to remove and replace asphalt concrete base pavement complete in place per specifications. Bid item also includes, but not be limited to, mobilization, demobilization, traffic control, saw cutting, removing and recycling of existing AC pavement and undisturbed native materials underneath up to 1 inch deep, furnishing, placing and compacting asphalt concrete pavement to 95% relative compaction, furnishing & placing fog seal, and protecting of existing utilities in place.

2. Grind and overlay, Bid Item 2:

Payment for 0.10 foot thick overlay paving shall be made at the contract price per square foot and shall constitute full compensation for all labor, material, equipment and Redlands Regular Meeting of 03-04-2025 970 of 1100
MEASUREMENT AND PAYMENT 01200-2
incidentals required to place an AC overlay. Bid item also includes, but not be limited to, mobilization, demobilization, traffic control, grinding, hauling and recycling of existing AC pavement, furnishing, placing and compacting asphalt concrete overlay per specifications.

3. Remove Temporary Material and Place 4-inch Depth PCC, Bid Item 3:

Payment for removal temporary material and place 4-inch depth PCC pavement shall be made at the contract square foot price and shall constitute full compensation for all labor, material, equipment, and incidentals required to remove temporary material and place Portland Cement Concrete (PCC) pavement complete in place per specifications.

Bid item also includes, but not be limited to, mobilization, demobilization, traffic control, saw cutting, removing and recycling of existing concrete pavement and undisturbed native materials underneath up to 1 inch deep, furnishing and placing PCC pavement, and protecting of existing utilities in place.

4. Replace Pavement Striping (Thermoplastic/Pain), Bid Item 4:

Payment for striping shall be made at the contract price per linear foot and shall constitute full compensation for all labor, material, equipment and incidentals required to replace paint or thermoplastic paint in kind. Bid item also includes, but not be limited to, mobilization, demobilization, traffic control, the removal of all temporary traffic control measures installed following pavement resurfacing and the installation of cat tracking and adjustment if field inspection requires.

5. Replace Pavement Markings (Thermoplastic), Bid Item 5:

Payment for pavement markings shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required to replace thermoplastic pavement markings in kind. Bid item also includes, but not be limited to, mobilization, demobilization, traffic control, the removal of all temporary traffic control measures installed following pavement resurfacing and the installation of cat tracking and adjustment if field inspection requires.

6. Replace Traffic Loops, Bid Item 6:

Payment for traffic loops shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required to replace traffic loops in kind. Bid item also includes, but not be limited to, mobilization, demobilization, traffic control, the removal of all temporary traffic control measures installed following pavement resurfacing and the installation of cat tracking and adjustment if field inspection requires.

7. Replace Pavement Markers, Bid Item 7:

Payment for retro-reflective pavement markers (RPM) shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required to replace pavement markers in kind. Bid item also includes, but not be limited to, mobilization, demobilization and traffic control.

END OF SECTION
Redlands Regular Meeting of 03-04-2025 971 of 1100
SECTION 01251 CHANGE ORDER REQUESTS

1.1 GENERAL
A. All quotations for preliminary change orders for extras, changes, additions, or deletions to the Work as described in EXTRA WORK of the GENERAL CONDITIONS shall be submitted to the ENGINEER, in writing, on the Change Order Request (COR) Cover Sheet and the Change Order Cost Summary Form, both attached, and in conformance with the requirements of Section 01254 CHANGE ORDERS. The quotation shall be firm for a period of not less than sixty (60) calendar days from the date of receipt of the quotation by the ENGINEER. The CONTRACTOR shall submit its written cost quotation and Time Impact Analysis not later than fifteen (15) days after being requested to provide such quotation, unless the ENGINEER allows more time. Delays in submitting quotations beyond the fifteen (15) days set forth herein, which cause a delay in the issuance of a Change Order or a delay to the completion date of the project, shall not be cause for a claim or a time extension under the Contract.

B. The ENGINEER'S request for quotation on a preliminary change shall not be considered authorization to proceed with the changed work prior to the issuance of a final Lump Sum or Time & Material Change Order, unless directed otherwise, in writing, by the ENGINEER, nor shall such request constitute justification for a delay to the existing Work or a time extension under the Contract.

END OF SECTION
CHANGE ORDER REQUESTS 01251-1
Redlands Regular Meeting of 03-04-2025 972 of 1100
CHANGE ORDER REQUESTS 01251-2
Redlands Regular Meeting of 03-04-2025 973 of 1100
Change Order Cost Summary
Project Name :

Change Order Request No. :

Date :

Direct
Labor
Direct
Materials
Direct
Equipment
(1): Lump Sum Work by $0.00 $0.00 $0.00
Prime Contractor
(2): "T&M" Work by $0.00 $0.00 $0.00 Prime Contractor
(3): Subtotal - Direct Work
$0.00 $0.00 $0.00 (Prime Contractor)

(4): All Lump Sum Work by $0.00 $0.00 $0.00 subcontractors (any tier) (5): All "T&M" Work by $0.00 $0.00 $0.00 subcontractors (any tier) Totals (6): Subtotal - Direct Work
$0.00 $0.00 $0.00 $0.00 (all subcontractors)
Add each of the
(3)+(6)=(7): Total - Direct Costs
$0.00 $0.00 $0.00
three columns
$0.00 across and enter
to the right.
(8): Markup
(20%
of
direct
labor)
(15% of
direct mat'l)
(15% of
direct equip)
$0.00 $0.00 $0.00 $0.00

(9): Prime Contractor
Markup 10% of line (6) direct sub work up up to
$5,000
for subcontractors plus 5% of line (6) direct sub work over $5,000

(10): Bonds & Insurance 1% of line (7)
$0.00 all direct work

(11): Additional amount
permitted by Contract

(12): GRAND TOTAL Add sums of lines)
$0.00 (7), (8), (9), (10) and (11)
CHANGE ORDER REQUESTS 01251-3
Redlands Regular Meeting of 03-04-2025 974 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 975 of 1100
CHANGE ORDERS 01254-1
SECTION 01254 CHANGE ORDERS

PART ONE -- GENERAL

1.1 REQUIREMENTS
Payment to the Contractor, or credit to the City, for any change, addition, deletion or extra to the Work, or settlement of any Claim, covered by any Change Order, shall be determined by the methods set forth herein. The Engineer may change the Plans and Specifications, character of the Work, or quantity of Work provided the total arithmetic dollar value of all such changes, both additive and deductive, does not exceed twenty-five percent (25%) of the Contract Price. Should it become necessary to exceed this limitation, the change shall be by written Supplemental Agreement between the Contractor and the City, which shall be executed by a Change Order.

Unless otherwise stipulated, “Unit Prices” include all costs necessary to furnish, install and complete the Work. The “Unit Prices” include all direct costs for labor, equipment and materials, all insurance and bond costs, all field and office supervisors and assistants, all onsite project administration, security costs, the cost of small tools and consumables, incidental job burdens, and all general home office expenses and no separate allowance will be made therefor. Assistants to field and office supervisors include all clerical, stenographic, and general office help. Incidental job burdens include, but is not limited to, office equipment and supplies, temporary toilets, telephone, utilities, safety equipment, warning devices, personal protective equipment, and conformance to OSHA requirements. Project administration includes, but is not limited to, review and coordination, estimating, engineering, scheduling, and expediting relative to Change Orders, and updating and furnishing Record Drawings to incorporate changes, schedule update, supervision not applied solely to the Work of the Change Order, home office salaries and expenses, and City of Redlands Business Tax.

A. Unit Prices
Unit prices stipulated in the Bid or itemized in the approved Schedule of Values shall be utilized, where they are applicable and determined reasonable by the Engineer. In the event that the Change Order results in a change in the original quantity of more than twenty-five percent (25%), either increase or decrease, then either the Engineer or the Contractor may request a review of the unit price to determine if a new unit price shall be mutually determined by negotiation. Any new unit price mutually determined under this Subsection shall only apply to the units in excess of one hundred twenty five percent (125%) of the original quantity for overruns. In case of underruns, the unit price stipulated in the Bid shall be applied to the first twenty-five percent (25%) of the actual quantity of work performed and the new mutually determined price shall be applied to the quantity between twenty-five percent (25%) and seventy-five percent (75%) of the original quantity.

Redlands Regular Meeting of 03-04-2025 976 of 1100
CHANGE ORDERS 01254-2
Renegotiated unit prices or unit prices for new items added to the Contract by Change Order shall be determined in accordance with Subsections B through G.

Whether stipulated in the Bid, itemized in the approved Schedule of Values or renegotiated, the unit prices used for payment constitute the total adjustment with no further costs owed for overhead, impact, profit, delay or impact to unchanged portions of the Contract, or any other reason. The unit price shall be full and final compensation as described in Subsection D.

The cost proposals for renegotiated unit prices shall be presented in accordance with the provisions of Subsections B through G. Should any Bid Item be deleted in its entirety, the amount bid for that bid item shall be subtracted from the total Contract amount. The Contractor shall be paid only for the actual cost incurred prior to the notification of such deletion for that Bid Item.

B. Lump Sum
The Engineer and the Contractor may mutually determine a total sum for the Extra Work. The Contractor shall summarize the total cost and furnish a breakdown of the proposed lump sum costs satisfactory to the Engineer in accordance with Subsections B through G. Such lump sum costs shall be full and final compensation as described in Subsection D. The Contractor’s quotation shall conform to the requirements of Section 01251- Change Order Requests, and be submitted in the Change Order Cost Summary Form provided (see Attachment 01251-A1). The Change Order Cost Summary Form cannot be used to nullify or supercede any specification or contractual provision.

If the method or amount of payment cannot be agreed prior to performing the Extra Work, the Engineer may unilaterally issue a Change Order in the amount determined reasonable by the Engineer for the Extra Work and direct the Contractor to proceed immediately. The Engineer also has the option to issue a Change Order directing the Work be done on a Time and Materials basis with the Contractor providing all labor, equipment, and materials necessary to complete the Work in a satisfactory manner and within a reasonable period of time.

Estimates for lump sum quotations and accounting for Time and Materials work shall be limited to direct expenditures necessitated specifically by the subject Extra Work, and shall be segregated as follows:

1. Labor, up to and including working general foremen, who are directly assigned to the Extra Work. Employees identified as superintendents or non-working general foremen shall not be charged as labor on Extra Work.

The labor costs shall include actual documented payroll costs including wages, payroll taxes as established by law (i.e., FICA, Federal and State Unemployment Taxes), fringe benefits as established by negotiated labor agreements, and any insurance costs (such as Worker's Compensation and General Liability Insurance but shall not include Automobile Liability Insurance or any other insurance costs). A detailed breakdown of those Redlands Regular Meeting of 03-04-2025 977 of 1100
CHANGE ORDERS 01254-3
subcomponents of labor costs, by all crafts shall be submitted to the Engineer, by the Contractor and all Subcontractors, for approval, as part of the documentation of labor costs, within ten (10) working days after issuance of the Notice to Proceed. No other subcomponents of labor costs shall be considered, unless approved in writing by the Engineer.

The labor cost is not allowed to be increased by using labor classifications with paygrades higher than necessary to accomplish the Work.

2. Materials: The cost of materials used in performing the Extra Work will be the cost, including sales tax and freight, to the purchaser, whether Contractor, Subcontractor or other forces, from the supplier thereof, except as follows:
a. Cash or trade discounts available to the purchaser shall be credited to the City notwithstanding the fact that such discounts may not have been taken by the Contractor.
b. For materials secured by other than a direct purchase and direct billing to the purchaser, the cost shall be deemed to be the price paid to the actual supplier as determined by the Engineer. Supplier markup, except for actual costs incurred in the handling of such materials, will not be allowed.
c. Payment for materials from sources owned wholly or in part by the purchaser shall not exceed the price paid by the purchaser for similar materials from said sources on contract items or the current wholesale price for such materials delivered to the Jobsite, whichever price is lower.
d. If, in the opinion of the Engineer, the cost of materials is excessive, or the Contractor does not furnish satisfactory evidence of the cost of such materials, then the cost shall be deemed to be the lowest current wholesale price for the quantity concerned, delivered to the Jobsite less cash or trade discount. The City reserves the right to furnish materials for the Work and no claim shall be made by the Contractor for costs and profit on such materials.
e. For the purposes of this Section, a "Supplier" is defined as any person or persons, firm or business, who supplies materials of construction and/or permanent equipment, but who does not perform any portion of the Work of the Contract on site, for the Contractor, except that labor or labor supervision which may be required by some manufacturers as part of their equipment installation for warranty or other purposes.

Redlands Regular Meeting of 03-04-2025 978 of 1100
CHANGE ORDERS 01254-4

3. Equipment Costs, including ownership, lease or rental costs, as well as operating costs, for individual equipment units whose replacement value is in excess of $500. Transportation and set up costs shall be included, but only if the equipment is imported to the worksite solely to perform work on the Extra Work described in the Change Order and the Contractor can demonstrate that the changed work cannot or could not be performed economically with equipment already at the site. Equipment costs shall be determined in accordance with the requirements set forth in Subsection G.

4. Small tools, equipment, consumables and incidental costs: No separate payment will be made for the use of small tools or equipment with a replacement value of $500 or less. This applies to tools and equipment owned by the Contractor or its subcontractors of any tier. Also, no separate payment will be made for fuel, lubricants, tool or equipment repairs, tool or equipment maintenance, consumables, drinking water, sanitary facilities or other incidentals. These costs are already included as a part of Markup.

5. Subcontractor Costs, including their overhead and profit, provided that such costs are direct costs to the Contractor for performing the Extra Work as set forth in Subsections B through G.

C. Time and Materials Work
The costs of all Changed/Extra Work submitted under the Time and Materials (T&M) method shall be formulated in accordance with the provisions of Subsections B through I.

Unless otherwise stipulated on the Change Order, the “Not-to-Exceed” amount for all T&M Change Orders is $10000. The Contractor is responsible for tracking costs and for notifying the Engineer in writing when costs approach 50% and 75% of the “Not-to-Exceed” amount. In addition, if the Changed/Extra Work cannot be completed within the “Not-to-Exceed” limit, the Contractor shall notify the Engineer in writing, and in a timely manner, that the limit requires an increase.

The City will only reimburse eligible costs up to the “Not-to-Exceed” amount.

The Contractor shall notify the Inspector at the beginning of each day when Changed/Extra Work is being performed. The Contractor shall notify the Inspector of the Changed/Extra Work being performed and describe the personnel involved, whether by Contractor forces or by its subcontractors at any tier. Failure to notify the Inspector prior to the start of Changed/Extra Work serves as the Contractor’s waiver to claim for compensation on that day.

For each working day, the Contractor shall submit a “Daily Extra Work Report” (DEWR) to the Inspector. The “Daily Extra Work Report” shall summarize labor, Redlands Regular Meeting of 03-04-2025 979 of 1100
CHANGE ORDERS 01254-5
equipment and materials supplied. The Inspector will only consider Forms that are properly completed as described below.

1. Separate forms must be used for labor and for equipment/materials.

2. Labor, equipment, material or expenditures that are not included on The DEWR are ineligible for payment. There will be no exceptions to this requirement. It is the responsibility of the Contractor to include any and all items of labor, equipment, or material for which it requests compensation for each day’s work completed.

3. Information required on the Labor form shall include name of personnel, personnel classification, and only the number of hours worked on Changed/Extra work for the day being reported. Since the overhead allowance already includes all necessary supervision, any hours for additional supervision or non-working foremen are ineligible for additional payment. The premium pay for a general foreman is eligible for payment only if the general foreman is a working foreman and a general foreman was required by a Union Labor Agreement or otherwise approved by the Inspector. The general foreman rate is eligible for payment only during the time that a general foreman was required for the Changed/Extra Work.

4. Information required on the Equipment/Material shall include Contractorowned equipment and/or tools, and rented equipment or tools for which compensation is requested. Information shall include the type of equipment, size of equipment, equipment identification number, appurtenances, and only the number of hours worked on the Changed/Extra work.

5. The only allowable materials are materials delivered to the job site and/or incorporated only into the Changed/Extra work. The allowable materials shall be listed on the T&M sheet for the day that they are delivered to the job site and/or incorporated into the Changed/Extra work.

6. Delivery ticket(s) and/or bill(s) of lading for rental equipment and/or tools delivered to the site and/or material incorporated into the work for the day being reported must be attached with the T&M sheet for that day. No payment will be allowed for materials and/or rented equipment unless receipt(s) or bill(s) of lading is attached. If the request for payment is not substantiated by original vendor/supplier invoices, acceptable copies of original invoices, or other documentation acceptable to the Inspector, the City may establish the cost of the item(s) at the lowest possible wholesale price or rental rate applicable while the work was being performed.

Redlands Regular Meeting of 03-04-2025 980 of 1100
CHANGE ORDERS 01254-6

7. Failure to submit the required “Daily Extra Work Report of Time and Material Work” by the close of the next working day shall waive all rights for that day unless otherwise approved by the Inspector. Work that cannot be substantiated by a “Daily Report”, approved and signed by the Inspector, is ineligible for payment.

8. The Contractor is responsible for preparing the “Daily Extra Work Report” for work by its Subcontractors and submitting the Forms to the Inspector on time.

9. The Contractor must have each “Daily Extra Work Report” verified by the Inspector. After the “Daily Extra Work Report” is approved by the Inspector, both the Contractor and Inspector sign the report. The original “Daily Extra Work Report” is retained by the Inspector with a copy provided to the Contractor.

10. When the “Daily Extra Work Report” is signed by the Inspector and the Contractor, it is binding on the Contractor and its Subcontractors.

11. When agreed to by the Inspector, the Contractor may submit a supplemental “Daily Extra Work Report” for labor, materials, or equipment for which the Contractor requests compensation but failed to list on the original daily report.
a. These supplemental forms shall be marked “SUPPLEMENTAL”. b. Unless otherwise approved by the Inspector, the supplemental forms may only be submitted for approval up to two (2) working days following the date when the work was performed.

No payment will be allowed for labor, materials, or equipment included on T&M sheets not signed by the Contractor and the Inspector. Payment will not be allowed for labor, materials, or equipment included on T&M sheets signed by anyone other than the Inspector or the Inspector’s immediate supervisor.

D. General
It is the intent of the City to settle all Change Orders full and final at the time the Change Order is issued. Therefore, the following paragraph shall be made a part of all Change Orders, whether included or not on the actual change order:
“The compensation (time and cost) set forth in a Change Order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers, for the Work or change defined in the Change Order, including impact on unchanged work. By signing the Change Order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Redlands Regular Meeting of 03-04-2025 981 of 1100
CHANGE ORDERS 01254-7
Suppliers, that the stipulated compensation includes payment for all work contained in the Change Order, plus all payment for the interruption of schedules, extended field overhead costs, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of the Change Order indicates that the Change Order constitutes full mutual accord and satisfaction for the change, and that the time and/or cost under the Change Order constitutes the total equitable adjustment owed the Contractor, all Subcontractors, and all Suppliers as a result of the change. The Contractor, on behalf of himself, all subcontractors, and all Suppliers, agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any further claim related to this Change Order.

No further claim or request for equitable adjustment of any type for any reasonably foreseeable cause shall arise out of or as a result of this Change Order or the impact of this Change Order on the remainder of the Work under this Contract.”
Costs which shall not be paid in Change Orders under this Contract include, but are not limited to, interest costs of any type; claim preparation or filing costs; legal expenses; the costs of preparing or reviewing proposed Change Orders or Change Order proposals; lost revenue; lost profits; lost income or earnings; rescheduling costs; costs of idled equipment when such equipment is not at the site or has not yet been employed on the Work; lost earnings or interest on unpaid retainage; claims consulting costs; and the costs of corporate officer or staff visiting the site; any compensation due to the fluctuation of foreign currency conversion or exchange rates; loss of other business; changes in taxes or increased tax rates of any kind or any costs identified as unallowable under the provisions of the Federal Acquisition Regulations.

Extensions of time shall be based solely upon the effect of delays to the Work as a whole. Extensions of time shall not be granted for delays to the Work, unless the Contractor can clearly demonstrate, through analysis of the current updated schedule, that the delay to the Work as a whole arose or will arise from causes other than normal weather, beyond the control and without fault or negligence of the Contractor, or any Subcontractor, at any tier, and that such delays did or will, in fact, delay the progress of the Work as a whole. The Contractor shall not be entitled to a time extension unless it submits a Time Impact Analysis which is a calculation of the extent of the delay to the end date of the Work and which shows that the Work has been or will be extended beyond the current Contract completion date. A Time Impact Analysis is a scheduling procedure which utilizes the networking techniques (fragnets) and a written analysis of the facts associated with the alleged delay to demonstrate the effect of the alleged delay on the critical path of the schedule. A "fragnet" is defined as a sequence of new activities and/or activity revisions that are proposed to be added to the existing current updated schedule to demonstrate (mathematically and graphically) the influence of the alleged delay on the end date of the Work and shall be the sole method for incorporating delays and impacts into the schedule. The objective of a Redlands Regular Meeting of 03-04-2025 982 of 1100
CHANGE ORDERS 01254-8
Time Impact Analysis is to pinpoint, isolate, and quantify all time impact associated with a specific issue and determine its time relationship to past or current delays. Time extensions shall not be allowed for delays to parts of the Work that are not on the critical path of the currently approved monthly updated project schedule. Time extensions shall not be granted, nor delay damages of any kind whatsoever paid to the Contractor, until all available float, slack, or contingency time on the project is used and the end date of the Work is moved beyond the current, adjusted Contract completion date.

The cost summary, cost breakdowns and requests for cost reimbursement submitted by the Contractor (for delay, disruption, hindrance and interference associated with the changes, additions, deletions or extras) shall be itemized in a manner that, with mathematical certainty and without reliance upon probabilities or inferences, segregates the direct, actual reimbursable costs associated with each individual, change, addition, deletion, extra and (on an event-by-event basis) each individual delay or disruption event. Such cost summaries, breakdowns or requests shall not be based, in whole or in part, upon any methodology (such as “total cost” or “modified total cost” methodologies) that purports to calculate the Contractor’s additional costs of performance of the extra, change, addition or deletion (including without limitation the additional costs of delay, disruption or other impact) based on the difference between Contractor’s total actual Project or line item costs (with or without fee) and its original bid estimate for the Project or any original bid estimate line item. In connection with the foregoing, Contractor represents and warrants that it has the ability to generate and maintain complete and accurate cost accounting records that will reflect (i) the actual costs incurred or saved for each individual item of Extra Work, change, addition, deletion (including without limitation any costs of associated delay, disruption, interference, hindrance and the cumulative impact of each extra, change, addition, deletion on other parts of the Work); and, (ii) on an event-by-event basis, the effect of each delay or disruption that forms the basis of each request for extension of time, regardless of their scope, number, complexity, cumulative effect, or time of issuance or occurrence.

Except as provided in Section 6-6 of the General Conditions, Contractor shall have no right to recovery of any compensation, costs, expenses or damages resulting from delay, disruption, interference, or hindrance in the performance of the Work (including without limitation interruption of schedules, excess or extraordinary extended field and indirect overhead costs, loss of productivity and the impact, ripple or cumulative effect on other Work).

Contractor waives any claim or rights and remedies based on abandonment, quantum merit, rescission or other similar legal theory by reason of any of the following circumstances, which the Contractor acknowledges and agrees are within the reasonable contemplation of the parties: (i) changes, additions, deletions and extras to the Work after execution of the Contract and issued from time to time throughout the period of construction, regardless of their scope, Redlands Regular Meeting of 03-04-2025 983 of 1100
CHANGE ORDERS 01254-9
number, cumulative value, or complexity, to correct errors, omissions, conflicts, and ambiguities in the Contract Documents, or to implement discretionary changes to the scope of Work requested by the City; (ii) the issuance and performance of changes, additions, deletions and extras in a manner that is not in sequence with the as-built or as-planned progress of the Work; (iii) changes due to Differing Site Conditions; (iv) suspensions of the Work or parts thereof, or limitations on access to portions or all of the Work, for the convenience of City or in the interests of the Project; (v) delay or disruption to the Work due to failure of the City, Engineer or Inspector to timely perform any contractual obligation.

E. Markups – Overhead and Profit

1. In addition to the direct expenditures specified for labor, materials and equipment in Subsection B, a lump sum will be paid for all overhead and profit, including: All insurance costs other than specifically mentioned in this Section, all field and office supervisors and assistants, all onsite project administration, security costs, the cost of small tools and consumables, incidental job burdens, and all general home office expenses and no separate allowance will be made therefor. Assistants to field and office supervisors include all clerical, stenographic, and general office help. Incidental job burdens include, but is not limited to, office equipment and supplies, temporary toilets, telephone, utilities, safety equipment, warning devices, personal protective equipment, and conformance to OSHA requirements. Project administration includes, but are not limited to, review and coordination, estimating, engineering, scheduling, and expediting relative to Change Orders, and updating and furnishing Record Drawings to incorporate changes, schedule update, supervision not applied solely to the Work of the Change Order, home office salaries and expenses, and City of Redlands Business Tax. Such lump sum shall conform to the following schedule of percentages of the total amount of direct expenditures of the Contractor and subcontractors.
(a) Work by Contractor. The following percentages shall be added to the Contractor’s costs and shall constitute the markup for all overhead and profits:
1) Direct Labor 20%
2) Direct Materials 15%
3) Direct Equipment 15%
(b) Work by Subcontractor. When all or any part of the extra work is performed by a Subcontractor, the markup established in (a) shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

Redlands Regular Meeting of 03-04-2025 984 of 1100
CHANGE ORDERS 01254-10

2. Bonds and Insurance
An additional allowance of one percent (1%) of all direct costs (less markup) is allowed.

3. Add/ Deduct Changes
The overhead rates determined above shall be applied to all additive Change Orders, except those utilizing as-bid Unit Prices listed in the Bid Proposal.

Any change in the Work involving both extras and credits shall show a net total cost, including subcontracts. Allowances for overhead and profit to the net total cost, as specified herein above, shall be applied if the net total cost is an extra; overhead and profit allowances shall not be applied if the net total cost is a credit. The estimated cost of deductions shall be based on labor and material prices on the date the Contract was signed.

4. When all or any part of the extra work is performed by a Subcontractor, the markup established in subsection 1.1.E.1 shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

F. City Furnished Materials, Equipment and Services
The Engineer reserves the right to furnish materials, equipment and services deemed expedient for use on the Changed/Extra Work. The Contractor shall have no claim for profit or overhead on the cost of such materials, equipment and services.

G. Equipment Costs
The rates for rental or leased equipment shall not exceed the rates listed in the Caltrans Labor Surcharge and Equipment Rental Rates (Caltrans LS&ERR). For T&M Change Orders, the rates are established by the actual paid invoice(s) that comply with the requirements of Subsections G.1 and G.3. Owned equipment costs shall not exceed the rates established by Subsection G.2. The most recent published edition in effect at the commencement of actual equipment use shall be used.

The rates paid for any rented or leased equipment or tools shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance and all incidental costs associated with the operation of the equipment or tools.

Redlands Regular Meeting of 03-04-2025 985 of 1100
CHANGE ORDERS 01254-11
It is the responsibility of the Contractor to include any appurtenances added to equipment which would increase the basic rate for said equipment (i.e., hoe-ram, oversize bucket, and etcetera) as established in the acceptable rental rate guide.

All equipment and/ or tools shall be acceptable to the Inspector, in good working condition, suitable for the purpose for which it is to be used, and necessary to complete the Changed/Extra Work. Payment will be based on the manner in which the equipment was actually powered, operated and modified per the equipment manufacturer’s recommendations.

1. Rented or Leased Equipment
For equipment rented or leased (including lease with purchase option) in arm's length transactions from outside vendors, the Contractor shall be paid the actual invoiced, rented or leased rates provided that the invoiced lease or rental rates do not exceed the rates set forth in the Caltrans LS&ERR. Arm's length rental or lease transactions are those in which the firm involved in rental or lease of such equipment is not associated with, owned by, have common management, directorship, facilities, or stockholders with the firm renting the equipment. Submittal by a Contractor of a rental or leased invoice from the lessor will be prima facie proof of compliance with the above. However, such invoices are not conclusive proof; if questioned, the burden of proof remains with the Contractor. In no event shall the leased equipment rate billed to the City be at rates exceeding those prescribed in the following table:

Actual Usage (Change Order
& Contract Work Combined) Payment Category
Less than 8 hours Hourly Rate
8 or more hours but less than 7 days Daily Rate
7 or more days but less than 30 days Weekly Rate
30 calendar days or more Monthly Rate
a. When in Use:

Actual equipment use time documented by the Inspector shall be the basis that the equipment was utilized on the changed work and paid for under the Change Order. In addition to the lease or rental rate, equipment-operating costs shall not exceed the estimated hourly operating rate as set forth in the Caltrans LS&ERR. The hours of operation shall be based upon actual equipment usage on the changed work as recorded by the Inspector. For multiple shift work sequences, the allowable equipment rate shall not exceed fifty percent (50%) of the base rate, for second or third shifts. b. When Idle:

Redlands Regular Meeting of 03-04-2025 986 of 1100
CHANGE ORDERS 01254-12
Idle equipment is equipment on site and necessary to perform the Work under the change but not in actual use due solely to the impact of the changed work. Equipment operating costs due to idle time, documented by the Inspector, shall be paid at the rate determined in “G” (1) above. Idle time shall include a reasonable time allowance to and from the project site.

Payment for equipment or tools shall be limited to hours actually worked on the Changed/Extra Work if the equipment or tool is already on site for Work under the original Contract. No “standby” time will be paid for equipment already on site for Work under the original Contract.

If equipment or tools are used intermittently and, when not in use, could be returned to the rental source at less expense than holding it at the work site, it shall be returned, unless the Contractor elects to keep it at the work site at no expense to the City.

2. Owned and Other Equipment
Equipment rates for owned equipment or equipment provided in other than arm's length transactions shall not exceed the total hourly costs as set forth in the Caltrans “Labor Surcharge and Equipment Rental Rates” effective at the time the work is performed. (The Caltrans equipment rental rates are available on the internet at
http://www.dot.ca.gov/hq/construc/equipmnt.html.) If the equipment is not listed in Caltrans LS&ERR, then the Rental Rate Blue Book shall be used. When using the Blue Book, the hourly rate for any period less than 7 days shall be the weekly rate divided by 40, plus the Operating Cost.

Except as noted herein below, this equipment hourly rate plus the estimated operating cost per hour from the Blue Book will be paid for each hour the equipment actually performs the Extra Work. Daily records listing the equipment units and their respective operators, identification code, and actual usage on the Work under the Change Order, as certified at the end of each work day (or work shift if the Work is being performed in multiple work shift sequence) by the Inspector shall be the record upon which actual equipment use shall be based. For multiple shift work sequences, the Caltrans overtime factor shall be applied (When using the Blue Book one-half the Non-Operating Cost will be deducted for second and third shifts. The Non-Operating Costs are the Blue Book monthly or weekly/40 rates, as applicable.). It is agreed that this rate shall represent payment in full for all the Contractor’s direct costs.
a. When Idle:

Redlands Regular Meeting of 03-04-2025 987 of 1100
CHANGE ORDERS 01254-13
Payment for equipment necessary to be on the site to complete the Work, but not in actual use due solely to the impact of the changed work, shall be paid per the table in Caltrans Standard
Specifications Section 9-1.03A(3b), provided that its presence and necessity on the site has been documented by the Inspector, and further provided that the equipment was idled solely by actions of the City. Idle equipment time will only be paid as a function of delays specifically directed or caused by the City's actions. In no event shall the idle time claimed in a day for a particular piece of equipment exceed the normal work schedule established for the project - usually eight (8) hours per day or forty (40) hours per week, and excluding Saturdays, Sundays, and holidays. For multiple shift work sequence, the allowable idle equipment rate shall not be allowed, for second or third shifts. It is agreed that this rate shall represent payment in full for all the Contractor’s direct costs.

3. Equipment Haulage and Set Up Costs
Documented and actual equipment haulage and set up costs shall be paid for, if applicable as set forth in Subsection B.3.

4. Other Equipment Cost Guides
In the event that a piece of equipment used on a Change Order is not listed in Caltrans or the Blue Book, costs may be derived from the Associated General Contractor’s of America Equipment Ownership Guide, the Associated Equipment Dealers Guide, or the Equipment Rate Guide published by the U.S. Army Corps of Engineers as adjusted appropriately for the type of work and use and the regional area of the Work under this Contract.

H. Records
At any time should the Contractor deviate substantially from the schedule, method and sequence of operation, equipment, cost or pricing data furnished by the Contractor and agreed to by the City in connection with the Change Order or should the City determine that any price negotiated in connection with the Change Order is defective due to such deviation or the fault of the Contractor, the City reserves the right to reduce the Change Order cost and reissue the Change Order at the amount in which the City determines to be the actual costs to complete the change.

Whenever any material or process is indicated or specified by patent or a proprietary name, or by name of a manufacturer in the Change Order, such direction shall not relieve the Contractor’s responsibility or obligation to perform Redlands Regular Meeting of 03-04-2025 988 of 1100
CHANGE ORDERS 01254-14
work in accordance with the contract requirements. The Contractor shall be solely responsible for, and have control over construction means, methods, techniques, sequences and procedures, coordination of all portions of the contract and Change Order work.

The Contractor shall on a weekly basis submit an approximate accounting of the amount expended on the Time and Materials work to date and an estimate of the Impact to the time of performance of work.

I. Partial Payments for Time and Materials Work.

Progress payments for Time and Materials work shall only be made if the anticipated cost of the changed work is in excess of $50,000 and/or the time to perform the changed work will exceed two (2) months duration. To receive payments for Time and Materials work, the Contractor shall submit to the Engineer an invoice of the daily reports which were verified by the Inspector, with details and documents, verifying the Contractor’s and Subcontractor's actual costs incurred for the Time and Materials work as set forth in Subsections B through H. Costs shall be submitted within thirty (30) calendar days after the T&M work has been satisfactorily completed unless an extension of time for submittal is authorized in writing by the Inspector.

END OF SECTION
Redlands Regular Meeting of 03-04-2025 989 of 1100
SECTION 01321 CONSTRUCTION SCHEDULE

1. THE REQUIREMENT
A. It is expressly understood and agreed that the time of beginning, the rate of progress, and the time of completion of the Work are of the essence of this Contract.

B. The CONTRACTOR’S representative in charge of scheduling is required to attend all meetings pertaining to scheduling and progress of the Work.

C. The CONTRACTOR shall submit to the ENGINEER 3 hard copies and the electronic file of the CONTRACTOR'S Construction Schedule (the schedule) at the time of the preconstruction meeting. The schedule shall be either a Critical Path Method (CPM) Network or a detailed Bar Chart with the critical path clearly shown. If the CPM network option is used, then Primavera Project Management or Microsoft Project shall be the scheduling software. If a detail Bar Chart is used, Microsoft Excel shall be the software utilized. The schedule shall include the following:

1. Activity ID,

2. Activity Description,

3. Start date for each activity,

4. Finish date for each activity,

5. Original duration,

6. Predecessor,

7. Successor,

8. Percent Complete,

9. Remaining Days.

A minimum of seven (7) calendar days for review of each schedule. Schedule activities shall be of sufficient detail to assure adequate planning has been done for proper execution of the Work and such that, in the sole judgement of the ENGINEER, it provides an appropriate basis for monitoring progress. The schedule shall begin with the date of issuance of the Notice to Proceed and conclude with the date of Final Completion shown in the Contract. Submittal and approval of the schedule in accordance with the requirements of this Section is a condition precedent to the issuance of any payments under this Contract. Once the schedule is approved it will become the baseline schedule and must be shown and compared on all subsequent schedule submittals.

D. Float, slack time, or contingency within the schedule (i.e., the difference in time between the project's early completion date and the required Contract Completion date), and total float within the schedule, is not for the exclusive use of either the CITY or the CONTRACTOR, but is a jointly owned expiring resource available to and shared by both parties. Pursuant to this float sharing requirement, use of CONSTRUCTION SCHEDULE 01321-1
Redlands Regular Meeting of 03-04-2025 990 of 1100
float suppression techniques shall be cause for rejection of the schedule and any revisions or updates.

E. Time extensions shall not be granted nor delay damages paid until a delay occurs which is beyond the control and without the fault or negligence of the CONTRACTOR and its Subcontractors or Suppliers, at any tier, and which extends actual performance of the Work beyond the current Contract completion date and the completion date projected by the current, approved, updated schedule. If the delay occurs along a path, which the current approved Construction Schedule update projects late completion prior to addition of any CITY caused delay, then the time extension allowed will be only for the additional delay demonstrated by the approved Time Impact Analysis. Time extensions shall be granted only if they are clearly demonstrated by the CONTRACTOR through the submittal, within seven (7) calendar days after the delay occurs, of a Time Impact Analysis which demonstrates the estimated impact on the end date of the Work; is based upon the updated Construction Schedule current as of the month the delay occurred; and demonstrates that the delay cannot be mitigated, offset, or eliminated through such actions as revising the intended sequence of Work or other means.

If a time extension if granted by the CITY, the updated schedule reflecting the change shall become the baseline and be reflected schedule and must be shown and compared on all subsequent schedule submittals.

Since float time within the Construction Schedule is jointly owned, it is acknowledged that CITY caused delays on the project may be offset by CITY caused time savings (e.g. critical path submittals returned in less time than allowed by the Contract or approval of substitution requests which result in a savings of time to the CONTRACTOR). In such an event, the CONTRACTOR shall not be entitled to receive a time extension or delay damages until all CITY caused time savings are exceeded and the Contract completion date is also exceeded.

F. If the initial schedule submitted shows completion of Work more than thirty (30) calendar days in advance of the Contract completion date, the ENGINEER may, at no cost to the CITY, decrease the Contract duration by issuance of a Change Order which changes appropriate Milestone Date(s) and the Contract completion date to the completion date reflected on the schedule. Any approved schedule, revision, or update having an early completion date shall show the time between the early completion date and the Contract completion date as "project float".

G. Comments made by the ENGINEER on the schedule during review will not relieve the CONTRACTOR from compliance with all requirements of the Contract. The ENGINEER may request that the CONTRACTOR and all major Subcontractors (defined herein as being any Subcontractor, Sub-Subcontractor, or Supplier with five (5) percent or more of the value of the Contract) participate in CONSTRUCTION SCHEDULE 01321-2
Redlands Regular Meeting of 03-04-2025 991 of 1100
review of any schedule submission. All revisions shall be submitted within seven (7) calendar days after the ENGINEER’S review.

H. Two copies of an updated schedule shall be submitted to the ENGINEER for approval with the submittal of each CONTRACTOR'S monthly payment request or the monthly payment request will be withheld. For those activities started but not yet completed at the time of submittal, the updated schedule shall reflect the percentage complete, as agreed between the CONTRACTOR and the INSPECTOR, and an estimate of the remaining duration. The monthly update of the schedule shall include an updated bar chart with logic arrows or network diagram and include the same additional data as required by Section 1.C. If the CPM network option is used, the schedule shall be calculated using remaining durations and the progress override option. The monthly update shall also include a complete, hard copy list of all the changes made from the previously approved submittal. If the schedule is done using Primavera, use a Claim Digger report for the list of changes.

I. The submittal of an updated schedule which meets the requirements of this Section, accurately reflects the status of the Work (for all previously accepted activities), and incorporates all approved changes into the schedule, shall be a condition precedent to the processing of the monthly payment application. (Actual and/or forecast dates for status of additional submittal cycles shall be added without the prior approval of the Engineer.) Updated schedules shall also be submitted at such other times as the ENGINEER may direct. Upon approval of a Change Order or issuance of a notice to proceed with a change, the approved change shall be reflected in the next schedule update.

J. If completion of any part of the Work, delivery of equipment or materials, or submittal of CONTRACTOR submittals is behind schedule and will impact the end date of the Work, the CONTRACTOR shall submit a written recovery plan acceptable to the ENGINEER for completing the Work by the current Contract completion date, if requested by the ENGINEER.

K. As a condition precedent to the release of any retained funds, the CONTRACTOR shall, after substantial completion of the Work has been achieved, submit a certified, final schedule which accurately reflects the manner in which the project was constructed and includes actual start and completion dates for all activities on the schedule.

END OF SECTION
CONSTRUCTION SCHEDULE 01321-3
Redlands Regular Meeting of 03-04-2025 992 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 993 of 1100
SECTION 01322 CONSTRUCTION PROGRESS PHOTOGRAPHY

1.1 GENERAL
A. Required: Provide photographs taken at the Jobsite at the specified stages of Contracted Work in accordance with provisions of this Section.

1. The Contractor shall provide the City with photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc).

2. Take first photographs just before CONTRACTOR starts any work operations at the Jobsite.

3. Take final photographs when all Contracted Work has been completed, regardless of time interval since previous photographs were taken.

1.2 SUBMITTALS
Except as otherwise directed by the ENGINEER, submit all photographs electronically on a CD/DVD organized by phase of construction and location.

1.3 QUALITY ASSURANCE
Photographs and prints to be of professional quality; clear, in focus, with high resolution and sharpness, and with minimum distortion.

END OF SECTION
CONSTRUCTION PROGRESS PHOTOGRAPHY 01322-1
Redlands Regular Meeting of 03-04-2025 994 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 995 of 1100
SECTION 01323 CONSTRUCTION STATUS REPORTS

1.1 REQUIREMENTS
A. Daily Status Report
The Contractor shall complete a daily report indicating manpower, major equipment, subcontractors, unusual occurrences and etc., involved in the performance of the work. The daily report shall be completed on forms prepared by the Contractor and approved by the City and shall be submitted to the Project Manager at the conclusion of each work week.

The Contractor shall also have workers on the project sign in and out each day on the City of Redlands Daily Sign In Sheet which shall state the name, times in and out and the work performed by each worker on the project each day. The completed Daily Sign In Sheets shall be submitted to the City of Redlands Project Manager at the end of each work week. Failure to submit daily reports and daily sign in sheets to the Project Manager on a weekly basis will result in a possible and temporary suspension of work until reports are submitted.

B. Weekly Status Report
During the construction phase of the Work, the CONTRACTOR shall submit weekly written status reports to the ENGINEER and the INSPECTOR. The report shall contain a record of inspections and tests, not performed by CITY forces, for all Work accomplished subsequent to the previous report and shall include the following information:

1. Type of work under way during the time frame of the report (e.g., earthwork, concrete work, structural steel erection, equipment manufacturing, component installation).

2. Inspections and tests, and location of inspections and tests that were made.

3. Results of inspections.

4. Reports of tests performed, including those specified, with the results of the tests, and acceptance criteria, including failures and remedial action to be taken. Test results, including all computations, shall be attached to the report form. Where test results cannot be completed by the time the report is submitted, a notation shall be made that the test was performed, including the approximate expected date that test results will be reported.

5. Report of any nonconforming items/activities. Nonconformance report forms designed solely for this purpose shall be utilized.

CONSTRUCTION STATUS REPORTS 01323-1
Redlands Regular Meeting of 03-04-2025 996 of 1100

6. Results of inspections of material and equipment done upon their arrival at the Jobsite and prior to their incorporation into the Work. This includes, but is not limited to, compliance with approved submittals, damage, and proper storage requirements.

7. Offsite quality control activities.

8. Instructions received from the ENGINEER or INSPECTOR.

9. In all cases, the report must be verified and signed by the CONTRACTOR'S representative. The verification is to contain the statement that all supplies and materials incorporated in the Work are in compliance with the terms of the Contract except where noted.

C. 3 Week Look Ahead Schedule
During the construction phase of the Work, the CONTRACTOR shall submit 3 Week Look Ahead reports to the ENGINEER at the weekly progress meetings or as directed by the ENGINEER. The report shall include the following information:

1. Type of work under way during the time frame of the report (e.g., earthwork, concrete work, structural steel erection, equipment manufacturing, component installation).

D. Miscellaneous Submittals
CONTRACTOR shall prepare a Daily Construction Report recording the following information concerning events at the job-site and submit original copies to the ENGINEER at weekly intervals for approval:

1. List of Subcontractors and Sub-Subcontractors at the site, types of works and job location.

2. Count of CONTRACTOR’S personnel at the site, name, type of work, hours completed and job location.

3. Construction equipments at the site.

4. High and low temperatures, general weather conditions.

END OF SECTION
CONSTRUCTION STATUS REPORTS 01323-2
Redlands Regular Meeting of 03-04-2025 997 of 1100
SECTION 01330 SUBMITTALS

1.1 THE REQUIREMENT
A. The CONTRACTOR shall furnish a schedule and list of all required submittals to the ENGINEER, including required submittals by all Subcontractors.

B. Wherever called for in these Specifications or on the plans, or where required by the ENGINEER, the CONTRACTOR shall furnish to the ENGINEER for review, two (2) hard copies and one electronic (PDF) copy of each submittal.

The term "submittal" as used herein shall be understood to include detail design calculations, design drawings, shop drawings, fabrication and installation drawings, erection drawings, lists, graphs, operating instructions, catalog sheets, data sheets, samples, and similar items. Unless otherwise required, said submittals shall be submitted to the ENGINEER at a time sufficiently early to allow review of same by the ENGINEER and to accommodate the rate of Construction Progress required under the Contract without delaying the Contract Work and with due regard for the possibility of resubmittals. All submittals shall be in English.

C. All design or shop drawings or other submittals shall be accompanied by a transmittal form for each submittal. Any submittal not accompanied by such a form may be returned, at the ENGINEER'S discretion, for resubmittal.

D. Normally, a separate transmittal form shall be used for each specific item or class of material or equipment for which a submittal is required. Transmittal of a submittal of various items using a single transmittal form will be permitted only when the items taken together constitute a manufacturer's "package" or are so functionally related that expediency indicates a review of the group or package as a whole. A multiple-page submittal shall be collated into sets, and each set shall be stapled or bound, as appropriate, prior to transmittal to the ENGINEER.

E. Shop Drawings shall show in detail the size, sections, and dimensions of all the member(s); the arrangement and construction of all connections and joints; all holes, straps, and other fittings required for attaching work and other pertinent details. When required, engineering computations shall be submitted. The CONTRACTOR shall be responsible for delivering reviewed copies of shop Drawings to all others whose work is dependent thereon. The CONTRACTOR shall maintain at the site of the Project, at all times, a complete file of approved Shop Drawings and manufacturers' data for this Project.

F. Except as may otherwise be provided herein, the ENGINEER will return prints of each submittal to the CONTRACTOR, with its comments noted thereon, within twenty (20) calendar days following their receipt by the ENGINEER. It is considered reasonable that the CONTRACTOR shall make a complete and acceptable submittal to the ENGINEER by the second submission of a submittal SUBMITTALS 01330-1
Redlands Regular Meeting of 03-04-2025 998 of 1100
item. The CITY reserves the right to withhold moneys due the CONTRACTOR to cover additional costs of the ENGINEER'S review beyond the second submittal. Submittal will be returned to the CONTRACTOR with one of four (4) markings:

1. If a submittal is returned to the Contractor marked "NO EXCEPTIONS," formal revision and resubmission of said submittal will not be required.

2. If a submittal is returned to the Contractor marked "EXCEPTIONS NOTED," formal revision and resubmission of said submittal will not be required, unless specifically requested.

3. If a submittal is returned to the Contractor marked "RETURNED FOR CORRECTION," the Contractor shall revise said submittal and shall resubmit the originally required number of copies of said revised submittal to the Engineer.

4. If a submittal is returned to the Contractor marked "NOT ACCEPTABLE," the Contractor shall revise said submittal and shall resubmit the originally required number of copies of said revised submittal to the Engineer.

G. All Work for which Shop Drawings are required shall be performed in accordance with the reviewed and approved copies. Fabrication of an item shall not commence before the ENGINEER has reviewed the pertinent submittal and returned the copies to the CONTRACTOR marked either "NO EXCEPTIONS TAKEN," or "MAKE CORRECTIONS NOTED“. Revisions indicated on submittals shall be considered as changes necessary to meet the requirements of the Contract Documents and shall not be taken as the basis for claims for extra work.

H. All CONTRACTOR submittals shall be carefully reviewed by an authorized representative of the CONTRACTOR prior to submission to the ENGINEER.

Each submittal shall be dated, signed, and certified by the CONTRACTOR as being correct and in strict conformance with the Contract Documents. No consideration for review by the ENGINEER of any CONTRACTOR’S submittal will be made for any items which have not been so certified by the CONTRACTOR. All noncertified submittals will be returned to the CONTRACTOR without action taken by the ENGINEER, and any delays caused thereby shall be the total responsibility of the CONTRACTOR.

I. Should the Shop Drawings or manufacturers data (for submittals required by the Standard Specifications or the specifications) show variations from the Contract requirements, the CONTRACTOR shall make specific mention of such variations in the letter of transmittal, in order that, if acceptable, suitable action may be taken for proper adjustment of the Contract; otherwise the SUBMITTALS 01330-2
Redlands Regular Meeting of 03-04-2025 999 of 1100
CONTRACTOR will not be relieved of the responsibility for executing the work in accordance with the Contract Documents, and the approved submittals.

J. The ENGINEER’S review of CONTRACTOR’S submittal shall not relieve the CONTRACTOR of the entire responsibility for the correctness of details and dimensions and conformance to the Specifications. The CONTRACTOR shall assume all responsibility and risk for any misfits due to any errors in the submittal. Any fabrication or other work performed in advance of the receipt of accepted submittals shall be entirely at the CONTRACTOR’S risk and expense.

The CONTRACTOR shall be responsible for the dimensions and the design of adequate connections and details.

K. CONTRACTOR’S Coordination:

1. ENGINEER will return and will not review unrelated submittals.

2. The CONTRACTOR may be required to provide drawings, setting diagrams and similar information necessary for proper coordination of Contracted Work. Such data shall remain between the CONTRACTOR and CONTRACTOR’S Subcontractor and will not be reviewed by the ENGINEER unless specifically called for in the Contract Documents.

3. ENGINEER will not review any required Structural Shop Drawings, Structural Calculations, etc., not prepared or signed by a State of California licensed ENGINEER.

4. ENGINEER will return and will not review any submittal requiring coordination with other submittals until such other submittals or required information is received by the Consultant or ENGINEER.

L. CONTRACTOR’S Submittals: CONTRACTOR’S submittals required for performance of Contracted Work, shall include, but are not limited to, the following:

1. Schedule of Values for all Lump Sum items within the Proposal.

2. Construction Schedule and Notification to ENGINEER of completion of each milestone or percentage increment of the Work as required.

3. Submittal Schedule

4. Daily Construction Reports

5. Shop Drawings and Structural Calculations.

6. Manufacturer’s Data and Specifications.

SUBMITTALS 01330-3
Redlands Regular Meeting of 03-04-2025 1000 of 1100

7. Samples

8. Templates

9. Certificate of Compliance

10. Construction Photographs

11. Substitutions

12. Record Drawings and Record Project Manual

13. Operation & Maintenance Manuals

14. Stock Materials, Spare parts, tools

15. Material Testing Results

16. Maintenance Logs and Maintenance Schedule.

M. CONTRACTOR shall conform to the provisions of the Contract Document and as may be specifically directed by the ENGINEER.

1. Preparation and processing of submittals shall be coordinated with Contracted Work operations, which include fabrication, purchasing and delivery of work items so as not to delay Contracted Work operations.

2. In each copy of the Submittal, mark every applicable material, product, equipment, manufacturer’s data, product information, color samples, rating or values, part and model numbers, etc. by red color circle. Each of the submittal items must be clearly distinguishable from other unrelated or similar items listed in the Manufacturer’s Catalog or Technical Specifications, Manuals, etc.

N. Coordination and Submittals:

1. Carefully review and coordinate all aspects of each item being submitted.

2. Carefully review contract drawings and technical sections, verify all work as laid out or indicated meeting the applicable codes and standards.

3. Ensure ample time for reviewing and processing of the submittals by the CITY or other authorized agencies, delays resulting from improper and untimely submittals shall be the responsibility of the CONTRACTOR.

SUBMITTALS 01330-4
Redlands Regular Meeting of 03-04-2025 1001 of 1100

4. Verify that all such submittal items conform to the Project Manual requirements noted in the Technical Sections.

5. Verify all site conditions and provide all required dimensions and measurements in Shop Drawings.

6. Where necessary, review the CITY’S comments, make changes and resubmit to local governing agencies for approval. Furnish the ENGINEER copies of the approved plans or drawings for review.

O. CONTRACTOR shall affix to each submittal, the CONTRACTOR’S signature certifying that required coordination has been performed and include on an attached label for processing and recording action taken, noting the following:

1. Name of the Project

2. Date of the Submittal

3. Name and address of Consultant

4. Name and address of the CONTRACTOR

5. Name and address of the Subcontractor(s)

6. Name and address of the Supplier

7. Name and address of the Manufacturer

8. Reference to Specification Section Number and Title

9. Reference to Drawing Sheet Number and detail(s)

10. Submittal Number

11. Priority Number and expected return date.

END OF SECTION
SUBMITTALS 01330-5
Redlands Regular Meeting of 03-04-2025 1002 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
SUBMITTALS 01330-6
Redlands Regular Meeting of 03-04-2025 1003 of 1100
SUBMITTALS 01330-7
Redlands Regular Meeting of 03-04-2025 1004 of 1100
SUBMITTALS 01330-8
Redlands Regular Meeting of 03-04-2025 1005 of 1100
SECTION 01572 EROSION CONTROL PLAN
Contractor shall comply with all laws, codes, ordinances and requirements of governing agencies regarding the discharge of pollutants, air and water pollution control and any other requirements for this project. Within 5 days of the Notice to Proceed, Contractor shall submit two (2) hardcopies of the draft Erosion Control Plan to the City for review. Any corrections or changes shall be made to the Erosion Control Plan, approved by the Engineer and implemented prior to any construction work on this project. The plan shall be updated as necessary or required for compliance purposes.

Payment for work on this item shall be made as a percentage of work completed at each monthly payment. All work under this item shall be as shown on the approved drawing accepted by the City prior to any work on the project. The Contractor shall have all work installed and inspected by the City prior to any work on the project.

Full compensation for this item shall be in accordance with all state and federal NPDES rules, regulations, requirements and laws and shall constitute all work for providing, installing, maintaining and removing all work as required for all excavations, earthwork, grading, grinding, paving, concrete, runoff containment, and any other work performed within the project boundaries.

END OF SECTION
WATER POLLUTION CONTROL PROGRAM 01572-1
Redlands Regular Meeting of 03-04-2025 1006 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1007 of 1100
SECTION 01721 MOBILIZATION

1.1 THE REQUIREMENT
A. General
Whether Mobilization is included as a Contract Bid Item in the Bid Proposal Form or specified as part of the lump sum in the Contract Documents, the cost of labor, equipment, materials and incidentals for doing all the work in mobilization (in advance of construction operations and not directly attributable to any specific bid item) shall be included in the Contract Price Breakdown and progress payment estimate. If there is no mobilization bid item the CONTRACTOR shall submit to the INSPECTOR for approval the Contract Price Breakdown with the amount established for mobilization.

Mobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:

1. Obtaining all permits, licenses, insurance, and bonds. Providing copies to the ENGINEER.

2. Moving onto the Jobsite all of CONTRACTOR’S plant and equipment as required.

3. Erecting temporary buildings and other construction facilities.

4. Installing temporary construction power and wiring.

5. Establishing fire protection system for its temporary facilities.

6. Developing construction water supply.

7. Providing field office trailers for the CONTRACTOR, complete with all specified equipment, furnishings, utility services and required approvals from the CITY.

8. Providing sanitary facilities or connecting to onsite sanitary facilities as specified.

9. Providing for potable water facilities as specified. This includes a means by which all on site CONTRACTOR, Subcontractor or supplier personnel can wash their hands with soap.

10. Arranging for, and erection of, CONTRACTOR’S work and storage yards and sheds.

MOBILIZATION 01721-1
Redlands Regular Meeting of 03-04-2025 1008 of 1100

11. Submitting all required Subcontractor insurance certificates and bonds.

12. Posting all CAL/OSHA required notices and establishment of safety programs.

13. Furnishing of Construction Schedule, Contract Price Breakdown and Submittal Schedules.

14. Erecting all temporary fencing, including removal and disposal of existing temporary fencing.

END OF SECTION
MOBILIZATION 01721-2
Redlands Regular Meeting of 03-04-2025 1009 of 1100
SECTION 01732 POTHOLING

1.1 THE REQUIREMENT
A. The CONTRACTOR shall conduct exploratory excavations by potholing to verify or to discover the actual locations and the size of existing underground utilities and improvements. The CONTRACTOR shall take care not to damage existing facilities during potholing operations. Any utility or existing facility (including those located by Underground Service Alert - USA) within 3 feet of any trench or excavation shall be potholed prior to starting the contract work in the vicinity.

Potholing shall be done in each given area where excavation work is to occur at least fourteen (14) calendar days in advance of any excavation or construction in that area, to avoid possible delay in the progress of the Work.

B. Potholing shall consist of excavations at the locations of utilities or other underground facilities indicated on the Drawings, located by USA, or as directed by the ENGINEER. All costs of potholing operations for the utilities indicated on the Drawings shall be included in the CONTRACTOR’S Bid.

C. If an allowance for “Additional Potholing” has been established and included in the SCHEDULE OF WORK AND PRICES, this allowance shall only be used to reimburse the CONTRACTOR for potholing utilities not shown or otherwise referenced on the drawings, or as directed by the ENGINEER. If the total cost of the Work directed under the Additional Potholing allowance differ from the amount set forth in the SCHEDULE OF WORK AND PRICES, the Contract Price shall be adjusted by a Change Order. The adjustment shall be the difference between the total actual costs and the amount included in the Bid, as an additional amount due to the CONTRACTOR or a credit to the CITY, as appropriate.

D. In addition to the potholes indicated on the Drawings, or directed by the ENGINEER, the CONTRACTOR may opt to do further potholing deemed necessary at no additional cost to the CITY.

E. Potholing operations shall conform to all applicable requirements as to sidewall slopes, sheeting and shoring, and all other excavation and trenching provisions specified herein.

F. Potholes shall be identified and protected in accordance with the Engineer’s instructions, the California Manual on Uniform Traffic Control Devices (MUTCD) and Work Area Traffic Control Handbook (WATCH) Standards.

G. The CONTRACTOR’S proposed method of potholing and schedule for potholing shall be submitted to the ENGINEER for approval, at least thirty (30) days prior to the commencement of operation. Any utilities damaged during potholing shall POTHOLING 01732-1
Redlands Regular Meeting of 03-04-2025 1010 of 1100
be immediately reported to the ENGINEER and INSPECTOR and repairs made immediately in accordance with the specifications.

H. A complete log of all potholes shall be kept by the CONTRACTOR, showing specific locations and dimensions of trenches. The log shall be verified by the INSPECTOR prior to the backfilling of the potholes. The verified log will be submitted to the ENGINEER and the INSPECTOR within two (2) working days after completion of potholing in each area. Payment for potholing utilities not shown or otherwise referenced on the drawings, or as directed by the ENGINEER will not be made unless these potholes are listed on the verified log.

I. The CONTRACTOR shall record the coordinates, elevations and dimensions of all utilities and improvements verified or discovered by potholing. The records shall be submitted to the ENGINEER within two (2) working days after the completion of potholing in each area. The records shall also include dates of the potholing operations and any additional discovered information or pertinent data.

J. Upon completion of potholing in each area, and after verification of the logs by the INSPECTOR, potholes shall be immediately backfilled and compacted in accordance with the specifications, or restored as directed by the ENGINEER.

END OF SECTION
POTHOLING 01732-2
Redlands Regular Meeting of 03-04-2025 1011 of 1100
DEMOBILIZATION 01740-1
SECTION 01740 DEMOBILIZATION

1.1 THE REQUIREMENT
A. General
Whether Demobilization is included as a Contract Bid Item in the Bid Proposal Form or specified as part of the lump sum in the Contract Documents, the cost of labor, equipment, materials and incidentals for doing all the work in demobilization (upon completion of all contract work and not directly attributable to any specific bid item) shall be included in the Contract Price Breakdown and progress payment estimate. If there is no demobilization bid item the CONTRACTOR shall submit to the INSPECTOR for approval the Contract Price Breakdown with the amount established for demobilization.

Demobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:

1. Moving off of the Jobsite all of CONTRACTOR’S plant and equipment as required.

2. Dismantling and removing all temporary buildings and other construction facilities.

3. Dismantling and removing all temporary construction power and wiring.

4. Removing all sanitary facilities from the work site.

5. Remove all waste, debris, and rubbish caused by construction operations within the work area, adjacent properties and public roads.

6. Materials and equipment shall be removed from the site as soon as they are no longer necessary. Before the final inspection, the site shall be cleared of equipment, unused materials and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the CONTRACTOR’S Bid.

7. Dismantling and removal of all temporary fencing.

8. Provide City with all required As-Built drawings.

9. All required Corner Records have been filed with the County and all copies provided to the City per Section 01722 Surveying.

10. All items noted within the final inspection (“Punchlist”) have been completed to the satisfaction of the City.

Redlands Regular Meeting of 03-04-2025 1012 of 1100
DEMOBILIZATION 01740-2

11. All project photographs as required within Section 01322 Construction Progress Photography have been provided.

12. Notice of Completion (NOC) will not be filed until all work is complete per this Section 01740.

END OF SECTION
Redlands Regular Meeting of 03-04-2025 1013 of 1100

TECHNICAL SPECIFICATIONS
Redlands Regular Meeting of 03-04-2025 1014 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1015 of 1100
SECTION 02222 PROTECTING EXISTING UNDERGROUND UTILITIES PART 1 - GENERAL
A. Description
This section includes materials and procedures for protecting existing underground utilities.

B. Related Work Specified Elsewhere

1. General Conditions
PART 2 - MATERIALS
A. Replacement in Kind
Except as indicated below or as specifically authorized by the Owner's Representative, reconstruct utilities with new material of the same size, type, and quality as that removed.

B. Vitrified Clay Sewer Pipe and Couplings
For sewer pipe 8 inches in diameter or under, replacement shall consist of plain-end pipe conforming to ASTM C 700. Compression couplings shall conform to ASTM C 594, band seal couplings or equal. Use at least two lengths of pipe in crossing the trench section as shown on the details in the drawings.

PART 3 - EXECUTION
A. General

1. Replace in kind street improvements, such as curbs and gutters, barricades, traffic islands, signalization, fences, signs, etc., that are cut, removed, damaged, or otherwise disturbed by the construction.

2. Where utilities are parallel to or cross the construction but do not conflict with the permanent work to be constructed, follow the procedures given below and as indicated in the drawings. Notify the utility owner 48 hours in advance of the crossing construction and coordinate the construction schedule with the utility owner's requirements. For utility crossings not shown in the drawings, refer to the General Conditions and the instructions of the Owner's Representative for guidance.

PROTECTING EXISTING UNDERGROUND UTILITIES 02222-1
Redlands Regular Meeting of 03-04-2025 1016 of 1100

3. Determine the true location and depth of utilities and service connections which may be affected by or affect the work. Determine the type, material, and condition of these utilities. In order to provide sufficient lead time to resolve unforeseen conflicts, order materials and take appropriate measures to ensure that there is no delay in work.

4. Expose utilities 1,300 feet in advance of the pipeline construction.

B. Procedures

1. Protect in Place: Protect utilities in place, unless abandoned, and maintain the utility in service, unless otherwise specified in the drawings or in the specifications.

2. Cut and Plug Ends: Cut abandoned utility lines and plug the ends. Plug storm drains and sewers with an 8-inch wall of brick and mortar. Cap waterlines with a cast-iron cap or install a 3-foot-long concrete plug. Dispose of the cut pipe as unsuitable material.

3. Remove and Reconstruct: Where so indicated in the drawings or as required by the Owner's Representative, remove the utility and, after passage, reconstruct it with new materials. Provide temporary service for the disconnected utility.

C. Compaction

1. Utilities Protected in Place: Backfill and compact under and around the utility so that no voids are left.

2. Utilities Reconstructed: Prior to replacement of the utility, backfill the trench and compact to an elevation 1 foot above the top of the ends of the utility. Excavate a cross trench of the proper width for the utility and lay, backfill, and compact.

3. Alternative Construction--Sand Slurry: Sand slurry consisting of one sack (94 pounds) of portland cement per cubic yard of sand and sufficient moisture for workability may be substituted for other backfill materials to aid in reducing compaction difficulties. Submit specific methods and procedures for the review of the Owner's Representative prior to construction.

4. The protection of the utility during construction.

D. Thrust Blocks on Waterlines
Note that restrained joints is the required method of controlling thrust restraint on this project except where shown on the plans or as approved otherwise by the City of Redlands.

1. The Contractor's attention is called to thrust blocks delineated in the drawings for waterlines throughout the project whose thrust is in the direction of the new excavation and, therefore, may be affected by the construction. These waterlines are PROTECTING EXISTING UNDERGROUND UTILITIES 02222-2
Redlands Regular Meeting of 03-04-2025 1017 of 1100
owned and operated by the Owner. Protect thrust blocks in place or shore to resist the thrust by a means approved by the Owner and reconstruct. If the thrust blocks are exposed or rendered to be ineffective in the opinion of the Owner's Representative, reconstruct them to bear against firm unexcavated or backfill material.

2. Provide firm support by backfilling that portion of the trench for a distance of 2 feet on each side of the thrust block to be reconstructed from the pipe bedding to the pavement subgrade, with either:
a. Sand-cement slurry (94 pounds of cement per cubic yard). b. The native material compacted to a relative compaction of 95%.

3. Then excavate the backfill material for construction of the thrust block.

4. Test compaction of the backfill material before pouring any concrete thrust block.

Use Class 560-C-3250 concrete for reconstruction.

E. Adjacent Parallel Utilities

1. The Contractor's attention is called to utilities throughout the project that are parallel to the proposed utility.

2. The position of these utilities is just outside the new construction. Protect these utilities from any disturbances and repair the lines and associated vaults and appurtenances if they are damaged in any way. All costs incurred for protection of these lines or any costs incurred due to the presence of the lines, whether or not they lie within the new construction, shall be borne in full by the Contractor.

END OF SECTION
PROTECTING EXISTING UNDERGROUND UTILITIES 02222-3
Redlands Regular Meeting of 03-04-2025 1018 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1019 of 1100

APPENDIX
Redlands Regular Meeting of 03-04-2025 1020 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1021 of 1100

APPENDIX A

CHECKLIST OF LABOR LAW REQUIREMENTS
Redlands Regular Meeting of 03-04-2025 1022 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1023 of 1100

CHECKLIST OF LABOR LAW REQUIREMENTS

TO REVIEW AT JOB CONFERENCE MEETINGS
Name (print) Date
Company Project
The Federal and State labor law requirements applicable to the contract are composed of, but not limited to, the following:

1. Payment of Prevailing Wage Rates
The contractor to whom the contract is awarded and its subcontractors hired for the public works project are required to pay not less than the specified general prevailing wage rates to all workers employed in the execution of the contract. The contractor is responsible for ascertaining and complying with all current general prevailing wage rates for crafts and any rate changes that occur during the life of the contract.

Information on all prevailing wage rates and all rate changes are to be posted at the job site for all workers to view.

2. Apprentices
It is the duty of the contractor and subcontractors to employ registered apprentices on the public works project under Labor Code Section 1777.5.

3. Penalties
There are penalties required for contractor's/subcontractor's failure to pay prevailing wages and for failure to employ apprentices, including forfeitures and debarment under Labor Code Sections 1775; 1776; 1777.1; 1777.7 and 1813.

4. Certified Payroll Reports
Under Labor Code Section 1776, contractors and subcontractors are required to keep accurate payroll records showing the name, address, social security number and work classification of each employee and owner performing work; also the straight time and overtime hours worked each day and each week, the fringe benefits, and, the actual per diem wage paid to each owner, journey person, apprentice worker or other employee hired in connection with the public works project. Employee payroll records shall be certified and shall be made available for inspection at all reasonable hours at the principal office of the contractor/subcontractor, or shall be furnished to any employee, or his/her authorized representative on request, pursuant to Labor Code Section 1776. Each contractor and subcontractor shall submit its weekly certified payroll reports to the LCR from the agency no less than weekly or within ten days of request. In the event that there has been no work performed during a given week, the certified payroll report shall be annotated: "No work" for that week. Under Labor Code Section 1776(h) there are penalties required for contractor's/ subcontractor's failure to maintain and submit copies of certified payroll records on request. **For projects bidding after April 1, all contractors will need to upload their certified payroll to the Department of Labor Standards Enforcement website. Effective Jan. 1, 2016, ALL projects will require contractors to upload all certified payroll. This requirement is in addition to the request for payrolls by the City of Redlands;

5. Nondiscrimination in Employment
There exist prohibitions against employment discrimination under Labor Code Sections 1735 and 1777.6, the Government Code, the Public Contracts Code, and Title VII of the Civil Rights Act of 1964.

6. Kickbacks Prohibited
Contractors and subcontractors are prohibited from recapturing wages illegally or extracting "kickbacks" from employee wages under Labor Code Section 1778.

Redlands Regular Meeting of 03-04-2025 1024 of 1100

7. Acceptance of Fees Prohibited
There exists a prohibition against contractor/subcontractor acceptance of fees for registering any person for public work under Labor Code Section 1779; or for filling work orders on public works contracts pursuant to Labor Code Section 1780.

8. Listing of Subcontractors
All prime contractors are required to list properly all subcontractors hired to perform work on the public works projects covering more than one-half of one percent, pursuant to Government Code 4100 et seq.

9. Properly Licensed and Registered
Contractors are required to be licensed properly and to require that all subcontractors be properly licensed.

Penalties are required for employing workers while unlicensed under Labor Code Section 1021 and under the California Contractor License Law found at Business and Professions Code Section 7000 et seq.

Contractors and subcontractors are also required to be registered with the Division of Labor Standards Enforcement to work on public works projects in California. Requirements for registration and penalties for not being registered are found in Labor Code 1773.3.

10. Unfair Competition Prohibited
Contractors and subcontractors are prohibited from engaging in unfair competition as specified under Business and Professions Code Sections 17200 to 17208.

11. Workers Compensation Insurance
Labor Code 1861 requires contractors and subcontractors be insured properly for workers compensation.

12. OSHA
Contractors and subcontractors are required to abide by the Occupational, Safety and Health laws and regulations that apply to the particular construction project.

13. Undocumented Workers
Contractors and subcontractors are prohibited by the Federal government against hiring undocumented workers, and must secure proof of eligibility/citizenship from all workers.

14. Itemized Wage Statements
Contractors and subcontractors must provide itemized wage statements to employees per Labor Code 226.

In accordance with Federal and State laws and with the awarding agency contract documents, the undersigned prime contractor wishes to assure the City of Redlands that it intends to comply with the above-referenced labor law requirements, fully understanding that failure to comply with the above requirements may subject it to penalties as provided above.

Contractor City of Redlands
Name Printed Name Printed
Signature Signature
Title Title
Date Date
Redlands Regular Meeting of 03-04-2025 1025 of 1100

IMPORTANT NOTICE
New Requirements for Contractors Working on California
Public Works / Prevailing Wage Projects
Significant changes in prevailing wage law have recently been made that affect all contractors working on Public Works Projects within California. Please note the following important information:

CONTRACTOR REGISTRATION REQUIREMENT
By April 1, 2015, all contractors must be registered with the Division of Labor Standards Enforcement (DLSE) to work on public works projects in California.

WHO must register?
All contractors and subcontractors working on public works projects in California must be registered. This includes prime contractors, subcontractors and sole owner/operators- everyone performing labor on a public works project.

WHEN is registration required?
Contractors must be registered with the DLSE to bid on all public works projects that bid after March 1, 2015.

All contractors working on public works projects must be registered by April 1, 2015. Registration is valid until June 30 of each year and may be renewed annually. Registrations are currently being accepted.

WHERE do I register?
Registration is done online at:
https://efiling.dir.ca.gov/PWCR/ActionServlet?action=displayPWCRegistrationForm HOW MUCH is the fee?
Contractor registration fee is currently set at $300 but may increase each year. This fee shall be paid during the initial registration and each annual renewal.

DO I qualify for registration?
Contractors will need to meet minimum qualification standards to be registered. These include:
• Be properly licensed with the Contractors State License Board for your trade. • Provide evidence of workers compensation insurance (if applicable). • Be in good standing (Have no outstanding liabilities for wages, damages, penalties due to an employee or the State, may not be under State or Federal debarment).

Redlands Regular Meeting of 03-04-2025 1026 of 1100
WHAT happens if I don’t register?
Unregistered contractors working on or bidding for public works projects will be subject to an immediate $2,000 fine and the $300 registration fee to continue working on the project. Unregistered contractors may be removed from the project by the Awarding Agency. Contractors found working on public works projects without being registered also risk not being approved for registration by DLSE.

ELECTRONIC CERTIFIED PAYROLL REPORTING REQUIREMENTS
Prevailing wage law has been changed to require contractors to submit certified payrolls electronically to the DLSE.

WHO is required to submit certified payrolls?
All contractors, subcontractors and sole owner/operators will be required to submit certified payrolls electronically to the DLSE.

WHEN do I need to submit certified payrolls electronically? If your project is awarded after April 1, 2015, electronic payroll submission is required immediately.

Otherwise, electronic payroll submission will be required for all projects awarded on or after January 1, 2016.

WHERE do I submit my certified payrolls?
For now, certified payrolls can be submitted by contractors to the DLSE at:
https://apps.dir.ca.gov/ecpr/DAS/AltLogin This website address will change when the DLSE implements their online electronic database system which still has not been developed. Alliant will notify contractors when this system is available.

DO I still need to submit hard copy certified payrolls? The City of Redlands will still require hard copy submission of certified payroll reports per your contract. The requirement to submit certified payrolls electronically to the DLSE does not replace the requirement for contractors to submit payrolls to the City of Redlands.

Contact the City of Redlands regarding any questions you may have regarding the new requirements for contractor registration or online submission of certified payroll: (909) 798-7698.

Redlands Regular Meeting of 03-04-2025 1027 of 1100
PUBLIC WORKS CONTRACT AWARD INFORMATION (DAS-140)
This is not a request for dispatch of apprentices.

Contract award information must be sent to your Apprenticeship Committee if you are approved to train. If you are not approved to train, you must send the information (which may be this form) to ALL applicable Apprenticeship Committees in your craft or trade in the area of the site of the public work.

Go to: http://www.dir.ca.gov/das/PublicWorksForms.htm for information about programs in your area and trade. The information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.

Do not send this form to the Division of Apprenticeship Standards.

NAME OF YOUR COMPANY CONTRACTORS STATE LICENSE NO.

MAILING ADDRESS-NUMBER & STREET, CITY, ZIP CODE AREA CODE & TELEPHONE NO.

NAME AND ADDRESS OF PUBLIC WORKS PROJECT DATE YOUR CONTRACT WAS EXECUTED

DATE OF EXPECTED/ACTUAL START OF PROJECT

NAME & ADDRESS OF PUBLIC AGENCY AWARDING CONTRACT ESTIMATED NUMBER OF JOURNEYMAN HOURS

OCCUPATION OF APPRENTICE

THIS FORM IS BEING SENT TO: (NAME AND ADDRESS OF APPRENTICESHIP PROGRAM(S) ESTIMATED NUMBER OF APPRENTICE HOURS

APPROXIMATE/ACTUAL DATES TO BE EMPLOYED

This is not a request for dispatch of apprentices.
*Contractors must make a separate request for actual dispatch, in accordance with Section 230.1(a) California Code of Regulations* Check One of the Boxes Below

1. We are already approved to train apprentices by the
Apprenticeship Committee. We will employ and train under their standards. (Enter name of Committee)

2. We will comply with the standards of
Apprenticeship Committee for the duration of this job only. (Enter name of Committee)

3. We will employ and train apprentices in accordance with the California Apprenticeship Council regulations, including § 230.1 (c) which requires that apprentices employed on public projects can only be assigned to perform work of the craft or trade to which the apprentice is registered and that the apprentices must at all times work with or under the direct supervision of journeyman/men.

Signature Date

Typed Name

Title
Redlands Regular Meeting of 03-04-2025 1028 of 1100
2J
DAS-140 FORM - PUBLIC WORKS CONTRACT AWARD INFORMATION
(Title 8, California Code of Regulations, Section 230)
(California Labor Code, Section 1777.5 (e))

SUBMIT CONTRACT AWARD INFORMATION
Prior to commencing work on a contract for Public Works every Contractor shall provide contract award information to the apprenticeship committee for each applicable apprenticeable craft or trade in the area of the site of the public works project that has approved the contractor to train apprentices. Contractors who are not already approved to train by an apprenticeship program sponsor shall provide contract award information to all of the applicable apprenticeship committees whose geographic area of operation includes the area of the public works project. This contract award information shall be in writing on a DAS Form 140, Public Works Contract Award Information or a letter which includes the following information:
(1) Contractor's name, address, telephone number and state license number; (2) The full name and address of the public work awarding agency; (3) The exact location of the public work site;
(4) Date of the contract award;
(5) Expected start date of the work;
(6) Estimated journeyman hours;
(7) Occupation of Apprentice;
(8) Approximate number of apprentices to be employed; and (9) Approximate dates apprentices will be employed.

This information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.

Failure to provide contract award information, which is known by the awarded contractor, shall be deemed to be a continuing violation for the duration of the contract, ending when a Notice of Completion is filed by the Awarding Body, for the purpose of determining the accrual of penalties under Labor Code Section 1777.7.

THE TOP SECTION OF THE FORM COMPLETELY FILLED OUT will provide the information required pursuant to California Labor Code Section 1777.5 and California Code of Regulations Section 230.1.

LOWER SECTION OF THE FORM Check an appropriate box (#1, 2 or 3) for your status.

In addition to the “ORIGINAL(S)” mailed to all applicable Apprenticeship Committees, a copy of this information shall also be submitted to the City of Redlands.

NOTE: The filing of a DAS 140 is not a request for the dispatch of registered apprentices Redlands Regular Meeting of 03-04-2025 1029 of 1100

CONTRACTOR FRINGE BENEFIT STATEMENT
Project Name: Project Location: Today’s Date:

Contractor / Subcontractor Name: Business Address:

In order that the proper Fringe Benefit rates can be verified when checking payrolls on the above contract, the hourly rates for fringe benefits, subsistence and/or travel allowance payment made for employees by the employer on the various classes of work are tabulated below. Please Include Apprentice Rates.

Classification: Effective Date:

Subsistence or Travel Pay:
$________________________

EMPLOYER PAID FRINGE BENEFITS
Health & Welfare
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Pension

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Vacation/Holiday
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Training

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Other
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Classification: Effective Date:

Subsistence or Travel Pay:
$________________________

EMPLOYER PAID FRINGE BENEFITS
Health & Welfare
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Pension

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Vacation/Holiday
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Training

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Other

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Supplemental statements must be submitted during the progress of the work should there be an increase or change in rates. Use additional sheets as necessary. (Attach a copy of your most recent premium transmittal (including copy of check submitted) into each of the above plans/funds/programs or a letter from the above plans/funds/programs reflecting current payment status).

I certify under penalty of perjury that fringe benefits are paid to the approved plans, funds or programs as listed above.

Print Name and Title Signature and Date (Wet Signature Required) Redlands Regular Meeting of 03-04-2025 1030 of 1100
S = STRAIGHT TIME *OTHER – Any other deductions, contributions and/or payments whether or not included or required by prevailing CERTIFICATION MUST be completed Form A-1-131 (New 2-80) O = OVERTIME wage determinations must be separately listed. Use extra sheet(s) if necessary (See reverse side) SDI = STATE DISABILITY INSURANCE
California Department of
Industrial Relations
Page ______ of ______
NAME OF CONTRACTOR: CONTRACTOR'S LICENSE NO.: ADDRESS:

OR SUBCONTRACTOR: SPECIALITY LICENSE NO.:

PAYROLL NO.: FOR WEEK ENDING: SELF-INSURED CERTIFICATE NO.: PROJECT OR CONTRACT NO.:
(4) DAY (5) (6) WORKERS' COMPENSATION POLICY NO.: PROJECT AND LOCATION:
(2) M T W TH F S S (9)
DATE
(1)

NAME, ADDRESS AND

SOCIAL SECURITY NUMBER

OF EMPLOYEE
NO. OF WITHHOLDING

EXEMPTIONS
(3)
WORK

CLASSIFICATION

HOURS WORKED EACH DAY
TOTAL
HOURS
HOURLY
RATE
OF PAY
(7)

GROSS AMOUNT
EARNED
(8)

DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS

NET WGS

PAID FOR
WEEK
CHECK
NO.

THIS

PROJECT
ALL

PROJECTS
FED.

TAX
FICA
(SOC. SEC.)
STATE

TAX SDI
VAC/

HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS

PROJECT
ALL

PROJECTS
FED.

TAX
FICA
(SOC. SEC.)
STATE

TAX SDI
VAC/

HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS

PROJECT
ALL

PROJECTS
FED.

TAX
FICA
(SOC. SEC.)
STATE

TAX SDI
VAC/

HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS

PROJECT
ALL

PROJECTS
FED.

TAX
FICA
(SOC. SEC.)
STATE

TAX SDI
VAC/

HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O

PUBLIC WORKS PAYROLL REPORTING FORM
Redlands Regular Meeting of 03-04-2025 1031 of 1100
Statement of Compliance
Date:______________
I __________________, the undersigned, am the ________________________________ with the authority to act for and on (Print Name) (Position in Business)
behalf of _______________________ certify under penalty of perjury that the records commencing on ______________ and ending on _______________ submitted herein and consisting of ____ pages are the originals, full and corrected documents, which depict the payroll record(s) of actual disbursements by way of cash, check, or whatever form to the individual or individuals names, (1) That this employer has complied with the requirements of the California Labor Code Sections. 1771, 1811, and 1815 for all performed on this public works project, and that the classifications set forth therein for each trade rate conform with the work Performed.
(2) That any apprentices employed in the above period are duly registered to a bona fide apprenticeship program registered with the State of California’s Division of Apprenticeship Standards.

PAYROLL/OTHER DEDUCTIONS

1. I herein certify the full and complete Prevailing Wages were paid as currently published and posted by the Director of Industrial Relations, State of California and only deductions as authorized under the laws of the State of California or the laws of United States of America have been made from these sums.

2. All other deductions are clearly listed for each employee on an attachment as required by the Director of Industrial Relations, State of California.

OPTIONAL BENEFIT PLANS
I herein certify that all employee deductions for benefit plans are authorized and the employee(s) are signed up for the plan(s) and are receiving the benefit(s) of the plan(s) listed.
 WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above payroll, payment of fringe benefits as listed in the contract have or will be made to the appropriate programs for the benefit of such employees, except as noted below.
 WHERE FRINGE BENEFITS ARE PAID IN CASH
Each laborer or mechanic listed in the above payroll has been paid as indicated on the payroll, an amount not less the sum of the applicable basic hourly rate plus the amount of the required fringe benefits as listed in the determination for the craft, except as noted below,
Exception(s)
________________________________________________________________________________________________________ Craft Explanation
________________________________________________________________________________________________________ Craft Explanation
________________________________________________________________________________________________________ Craft Explanation
I herein certify under the penalty of perjury all of the above is true and correct as submitted. ________________________________________________________________________________________________________ Name Signature
________________________________________________________________________________________________________ Date Payroll #
Remarks
____________________________________________________________________________________________________ Redlands Regular Meeting of 03-04-2025 1032 of 1100
2N

CONTRACTOR INFORMATION SHEET
Job Name: _________________________________________ Category: ____________________________________ Prime Contractor: ___________________________________________________________________________________ Subcontractor: ______________________________________ License#: _____________________________________ Address: ____________________________________________________________________________________________ Phone #: ___________________________________________ Payroll Report Contact: _______________________ Email Address: _____________________________________________________________________________________ Fax #: ______________________________________________ Contract Amount: ____________________________ Estimated Start Date: _______________________________ Estimated End Date: _________________________ ANTICIPATED TRADES/CLASSIFICATIONS:
______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ SUB-CONTRACTORS (if applicable)
Name: License #: Phone/ Fax #: Contact:
______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ Redlands Regular Meeting of 03-04-2025 1033 of 1100

APPENDIX B

CITY OF REDLANDS WORKDAY CONSTRUCTION

SCHEDULE
Redlands Regular Meeting of 03-04-2025 1034 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1035 of 1100

CITY OF REDLANDS
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT 2024 APPENDIX B

CONSTRUCTION WORKDAY CALENDAR

JANUARY FEBRUARY MARCH

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 1 2 3 1 2
1 2 3 4 5 6 32 33 34 61 62
7 8 9 10 11 12 13 4 5 6 7 8 9 10 3 4 5 6 7 8 9
7 8 9 10 11 12 13 35 36 37 38 39 40 41 63 64 65 66 67 68 69 14 15 16 17 18 19 20 11 12 13 14 15 16 17 10 11 12 13 14 15 16 14 15 16 17 18 19 20 42 43 44 45 46 47 48 70 71 72 73 74 75 76 21 22 23 24 25 26 27 18 19 20 21 22 23 24 17 18 19 20 21 22 23 21 22 23 24 25 26 27 49 50 51 52 53 54 55 77 78 79 80 81 82 83 28 29 30 31 25 26 27 28 29 24 25 26 27 28 29 30
28 29 30 31 56 57 58 59 60 84 85 86 87 88 89 90
31 91

APRIL MAY JUNE

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 1 2 3 4 1
92 93 94 95 96 97 122 123 124 125 153
7 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8
98 99 100 101 102 103 104 126 127 128 129 130 131 132 154 155 156 157 158 159 160 14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 15 105 106 107 108 109 110 111 133 134 135 136 137 138 139 161 162 163 164 165 166 167 21 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 22 112 113 114 115 116 117 118 140 141 142 143 144 145 146 168 169 170 171 172 173 174 28 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29
119 120 121 147 148 149 150 151 152 175 176 177 178 179 180 181 30 182

JULY AUGUST SEPTEMBER

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 7
183 184 185 186 187 188 214 215 216 245 246 247 248 249 250 251 7 8 9 10 11 12 13 4 5 6 7 8 9 10 8 9 10 11 12 13 14
189 190 191 192 193 194 195 217 218 219 220 221 222 223 252 253 254 255 256 257 258 14 15 16 17 18 19 20 11 12 13 14 15 16 17 15 16 17 18 19 20 21 196 197 198 199 200 201 202 224 225 226 227 228 229 230 259 260 261 262 263 264 265 21 22 23 24 25 26 27 18 19 20 21 22 23 24 22 23 24 25 26 27 28 203 204 205 206 207 208 209 231 232 233 234 235 236 237 266 267 268 269 270 271 272 28 29 30 31 25 26 27 28 29 30 31 29 30
210 211 212 213 238 239 240 241 242 243 244 273 274

OCTOBER NOVEMBER DECEMBER

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 1 2 1 2 3 4 5 6 7
275 276 277 278 279 306 307 336 337 338 339 340 341 342 6 7 8 9 10 11 12 3 4 5 6 7 8 9 8 9 10 11 12 13 14
280 281 282 283 284 285 286 308 309 310 311 312 313 314 343 344 345 346 347 348 349 13 14 15 16 17 18 19 10 11 12 13 14 15 16 15 16 17 18 19 20 21 287 288 289 290 291 292 293 315 316 317 318 319 320 321 350 351 352 353 354 355 356 20 21 22 23 24 25 26 17 18 19 20 21 22 23 22 23 24 25 26 27 28 294 295 296 297 298 299 300 322 323 324 325 326 327 328 357 358 359 360 361 362 363 27 28 29 30 31 24 25 26 27 28 29 30 29 30 31
301 302 303 304 305 329 330 331 332 333 334 335 364 365 366 City Holiday
Closed
Redlands Regular Meeting of 03-04-2025 1036 of 1100

CITY OF REDLANDS
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT 2025 APPENDIX B

CONSTRUCTION WORKDAY CALENDAR

JANUARY FEBRUARY MARCH

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 1 1
1 2 3 4 32 60
5 6 7 8 9 10 11 2 3 4 5 6 7 8 2 3 4 5 6 7 8
5 6 7 8 9 10 11 33 34 35 36 37 38 39 61 62 63 64 65 66 67 12 13 14 15 16 17 18 9 10 11 12 13 14 15 9 10 11 12 13 14 15 12 13 14 15 16 17 18 40 41 42 43 44 45 46 67 69 70 71 72 73 74 19 20 21 22 23 24 25 16 17 18 19 20 21 22 16 17 18 19 20 21 22 19 20 21 22 23 24 25 47 48 49 50 51 52 53 75 76 77 78 79 80 81 26 27 28 29 30 31 23 24 25 26 27 28 23 24 25 26 27 28 29 26 27 28 29 30 31 54 55 56 57 58 59 82 83 84 85 86 87 88 30 31
89 90

APRIL MAY JUNE

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 1 2 3 1 2 3 4 5 6 7
91 92 93 94 95 121 122 123 152 153 154 155 156 157 158
6 7 8 9 10 11 12 4 5 6 7 8 9 10 8 9 10 11 12 13 14
96 97 98 99 100 101 102 124 125 126 127 128 129 130 159 160 161 162 163 164 165 13 14 15 16 17 18 19 11 12 13 14 15 16 17 15 16 17 18 19 20 21 103 104 105 106 107 108 109 131 132 133 134 135 136 137 166 167 168 169 170 171 172 20 21 22 23 24 25 26 18 19 20 21 22 23 24 22 23 24 25 26 27 28 110 111 112 113 114 115 116 138 139 140 141 142 143 144 173 174 175 176 177 178 179 27 28 29 30 25 26 27 28 29 30 31 29 30
117 118 119 120 145 146 147 148 149 150 151 180 181

JULY AUGUST SEPTEMBER

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 1 2 1 2 3 4 5 6
182 183 184 185 186 213 214 244 245 246 247 248 249
6 7 8 9 10 11 12 3 4 5 6 7 8 9 7 8 9 10 11 12 13
187 188 189 190 191 192 193 215 216 217 218 219 220 221 250 251 252 253 254 255 256 13 14 15 16 17 18 19 10 11 12 13 14 15 16 14 15 16 17 18 19 20 194 195 196 197 198 199 200 222 223 224 225 226 227 228 257 258 259 260 261 262 263 20 21 22 23 24 25 26 17 18 19 20 21 22 23 21 22 23 24 25 26 27 201 202 203 204 205 206 207 229 230 231 232 233 234 235 264 265 266 267 268 269 270 27 28 29 30 31 24 25 26 27 28 29 30 28 29 30
208 209 210 211 212 236 237 238 239 240 241 242 271 272 273 31 243

OCTOBER NOVEMBER DECEMBER

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 1 1 2 3 4 5 6
274 275 276 277 305 335 336 337 338 339 340
5 6 7 8 9 10 11 2 3 4 5 6 7 8 7 8 9 10 11 12 13
278 279 280 281 282 283 284 306 307 308 309 310 311 312 341 342 343 344 345 346 347 12 13 14 15 16 17 18 9 10 11 12 13 14 15 14 15 16 17 18 19 20 285 286 287 288 289 290 291 313 314 315 316 317 318 319 348 349 350 351 352 353 354 19 20 21 22 23 24 25 16 17 18 19 20 21 22 21 22 23 24 25 26 27 292 293 294 295 296 297 298 320 321 322 323 324 325 326 355 356 357 358 359 360 361 26 27 28 29 30 31 23 24 25 26 27 28 29 28 29 30 31
299 300 301 302 303 304 327 328 329 330 331 332 333 362 363 364 365 30 334
City Holiday
Closed
Redlands Regular Meeting of 03-04-2025 1037 of 1100

REDLANDS UNIFIED SCHOOL DISTRICT

STUDENT ATTENDANCE CALENDAR
2024-2025

ALL REDLANDS SCHOOLS
1 2 3 4 5 6/7 8 9 10 11 12 13/1415 16 17 18 19 20/2122 23 24 25 26 27/2829 30 31 1 2 3/4 5 6 7 8 9 10/1112 13 14 15 16 17/1819 20 21 22 23 24/2526 27 28 29 30 31/1 2 3 4 5 6 7/8 9 10 11 12 13 14/1516 17 18 19 20 21/2223 24 25 26 27 28/29 30 H 9 P P 4 H
H P P 5 H
1 2 3 4 5/6 7 8 9 10 11 12/1314 15 16 17 18 19/2021 22 23 24 25 26/2728 29 30 31 1 2/3 4 5 6 7 8 9/10 11 12 13 14 15 16/1718 19 20 21 22 23/2425 26 27 28 29 30/1 2 3 4 5 6 7/8 9 10 11 12 13 14/1516 17 18 19 20 21/2223 24 25 26 27 28/29 30 31

P X H M M M M M H H H H H H H H H H H H

P H H H H H H X H H H H H H H
1 2 3 4/5 6 7 8 9 10 11/1213 14 15 16 17 18/1920 21 22 23 24 25/2627 28 29 30 31 1/2 3 4 5 6 7 8/9 10 11 12 13 14 15/1617 18 19 20 21 22/2324 25 26 27 28 1/2 3 4 5 6 7 8/9 10 11 12 13 14 15/1617 18 19 20 21 22/2324 25 26 27 28 29/30 31

H H H H H H H H H H M H H H H H H

H H H H H H H H H H H H H H H H
1 2 3 4 5/6 7 8 9 10 11 12/1314 15 16 17 18 19/2021 22 23 24 25 26/2728 29 30 1 2 3/4 5 6 7 8 9 10/1112 13 14 15 16 17/1819 20 21 22 23 24/2526 27 28 29 30 31/1 2 3 4 5 6 7/8 9 10 11 12 13 14/1516 17 18 19 20 21/2223 24 25 26 27 28/29 30

H H H H H M M P

H H H H H M P
End of Quarter and Semester Dates - Grades TK/K and 6-12 Quarter 1 - October 4 H - Holidays - NO ATTENDANCE
Elementary 42 days
Secondary Quarter 2 / Semester 1 - December 19 LABOR DAY September 2 47 days Quarter 2 VETERANS DAY November 11
P Staff Professional Day (No Students In Attendance) 89 days Semester 1 THANKSGIVING RECESS November 25 - 29 M Minimum Day - Conferences/Report Card Preparation Quarter 3 - March 21 WINTER RECESS December 23 - January 10 H Holiday (No Students In Attendance) 48 days MARTIN LUTHER KING DAY January 20 X Report Card Day (No Students In Attendance) Quarter 4 / Semester 2 / End of year - June 5 PRESIDENTS' DAY February 17 43 days Quarter 4 SPRING BREAK March 24 - April 4
91 days Semester 2 MEMORIAL DAY May 26
Student Attendance Days - 180 End of Trimester Dates - Grades 1-5 Teacher Attendance Days - 185 Trimester 1 - November 1
61 days
Trimester 2 - February 28
61 days
Trimester 3 - June 5
58 days
Board Approved: January 9, 2024
July August September
October November December
January February March
April May June
Redlands Regular Meeting of 03-04-2025 1038 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1039 of 1100

APPENDIX C

PERMITS
Redlands Regular Meeting of 03-04-2025 1040 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1041 of 1100
…
…
.

YES NO
.
…
…
…
.

YES NO
YES NO
Application for Road / Encroachment Permit
City of Redlands - Municipal Utilities & Engineering Department Name: Phone:

Address: City: Zip:

Contractor: USA ID No.:

Contractor License No.: Type: Cal OSHA No.:

I hereby request permission to construct/install improvements/facilities within the City of Redlands road right-of-way at the following location:

Construction Start Date: Anticipated Completion Date:

Development No.: Plan No.:

Street Name:

Cross Streets:

Address:
and for the purpose of performing the following work:

Applicant/Agent Signature: Date:

In accordance with Plans approved by the Municipal Utilities & Engineering Director and/or the Standard Specifications and Detail Drawings of the City of Redlands for the quantity and type of improvements listed below:

SHADED AREA FOR OFFICIAL USE ONLY
EA Driveway Appr, Res/Comm……………… $ 49.00 / EA =$ Truck Route Permit Required:

SF Sidewalk…………………………………… $ 0.09 / SF =$ YES NO
SF Cross Gutter/Spandrel…………………… $ 0.58 / SF =$
LF Curb & Gutter…………………………… $ 2.19 / LF =$ Closure Permit With LF Curb/Berm………………………………… $ 2.62 / LF =$ Traffic Plan Required:

SF Asphalt Pavement…………………………$ 0.04 / SF =$
SF Crushed Aggregate Base……………… $ 0.04 / SF =$
EA Street Light…………………………………$ 81.00 / EA =$ Water Shutdown Required:

EA Traffic Signal - New………………………. $ 2,152.00 / EA =$
EA Traffic Signal - Modification………………$ 1,737.00 / EA =$ CY Reinforced Concrete…………………… $ 89.00 / CY =$ Bond Required:

LF Storm Drain Pipe…………………………. $ 8.00 / LF =$
EA Curb Inlet/Outlet Structures………………$ 67.00 / EA =$
EA Storm Drain Manhole/Junction Box…….. $ 67.00 / EA =$ EA Curb Core…………………………………. $ 62.00 / EA =$
LF Sewer Main……………………..………… $ 0.95 / LF =$
EA Sewer Manhole…………………..………. $ 67.00 / EA =$ Conduit Material:

EA Sewer Cleanout……………………………$ 134.00 / EA =$
EA Sewer Lateral…………………………… $ 67.00 / EA =$
LF Water Main - Potable…………………….. $ 1.09 / LF =$ Conduit Size:

LF Water Main - Non-Potable……...……….. $ 1.09 / LF =$
EA Fire Hydrant Assembly……………………$ 66.00 / EA =$
EA Water Service Lateral……………………. $ 26.00 / EA =$
EA Water Shutdown………………………….. $ 67.00 / EA =$
EA Fire Service……………………………… $ 58.00 / EA =$
LF Excavation/Utility Trench………..….…….$ 1.25 / LF =$
SF Street Patch……………………………….. $ 0.67 / SF =$
SF Warranty Fee (Street Cut)……………..…$ / SF =$
$ / =$ Calculated By
$ / =$
SUBTOTAL PERMIT FEE $
PERMIT FEE work complete within specified date from issuance = Inspected by $ 219.00 fee. $219.00
Municipal Utilities & Engineering
PENALTY FEE 25% of total permit fee if issued after commencement of work $ ($250.00 minimum fee)
(Effective 06/02/09) TOTAL ENCROACHMENT PERMIT FEE $ Approved By Redlands Regular Meeting of 03-04-2025 1042 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1043 of 1100

APPENDIX D

CITY OF REDLANDS MUED GENERAL PERMIT

CONDITIONS AND TRENCH SPECIFICATIONS
Redlands Regular Meeting of 03-04-2025 1044 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1045 of 1100

CITY OF REDLANDS

MUNICIPAL UTILITIES AND

ENGINEERING DEPARTMENT

GENERAL PERMIT CONDITIONS

AND TRENCH SPECIFICATIONS
January 2023 Edition
Redlands Regular Meeting of 03-04-2025 1046 of 1100
Redlands Regular Meeting of 03-04-2025 1047 of 1100
i

TABLE OF CONTENTS
1 - GENERAL

1.1 Standards and Specifications

1.2 Changes or Additions to Permit

1.3 Relocation

1.4 Utility Construction

1.5 Licensed Contractor

1.6 Permit Possession

1.7 Permittee Responsibility

1.8 Hold Harmless

1.9 Notification

1.10 Inspection

1.11 Failure to Comply
2 – PUBLIC CONVENIENCE & SAFETY

2.1 Traffic and Access

2.2 Traffic Control

2.3 Working Hours

2.4 Dewater Operations

2.5 Closing Roads
3 - PRESERVATION OF PROPERTY

3.1 Protection of Property

3.2 City Facilities

3.3 Traffic Signals

3.4 Survey Monuments

3.5 Underground Service Alert Markings
4 - PROJECT SITE MAINTENANCE

4.1 Clean-up and Dust Control

4.2 Truck Routes

4.3 Storage in City Roads

4.4 Emergency Response

4.5 Maintenance of Trenches
5 - MATERIALS AND EQUIPMENT

5.1 Pavement Traffic Markings & Striping

5.2 Asphalt Concrete

5.3 Rubberized Asphalt Concrete

5.4 Base Material

5.5 Grading Equipment

5.6 Track Equipment

5.7 Paving Equipment
6 - TRENCHING

6.1 Definition of Trenching

6.2 Cal OSHA

6.3 New Roads

6.4 Pavement Removal

6.5 Open Trench

6.6 Trench Bridging

6.7 Protective Fencing

6.8 Trench Backfill

6.9 Bedding Zone

6.10 Narrow Trench

6.11 Inclement Weather
7 - COMPACTION

7.1 Relative Compaction (RC)

7.2 Compaction Frequency and Location

7.3 Test Reports

7.4 Mechanical Compaction

7.5 Water Densification
8 - TRENCH CONSTRUCTION & REPAIR

8.1 Temporary Pavement

8.2 Trench Pavement Repair - General

8.3 Permanent AC Paving Repair

8.4 Overlay Paving

8.5 Excessive Pavement Removal

8.6 Pavement Resurfacing

8.7 Driveway Approaches

8.8 Portland Cement Concrete

8.9 Trench Failure and Repair

STANDARD DRAWINGS

TITLE NUMBER
Trench Repair General Notes……………. 190
T-Cut Trench Repair………………………191
Butt Joint Trench Repair…………………..192
Trench Overlay Detail……………………..193
Plate Bridging Detail………………………194
Redlands Regular Meeting of 03-04-2025 1048 of 1100
ii

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1049 of 1100
1 1 - GENERAL

1.1 Standards and Specifications -- The work shall be done in accordance with the current City of Redlands Standards, Standard Specifications for Public Works Construction (Greenbook), latest edition, and these Conditions and Specifications. Any deviation from said requirements must be approved in writing by the City Engineer.

1.2 Changes or Additions to Permit -- The City reserves the right to make any changes or additions to a permit after issuance if such changes or additions are believed necessary for the protection of roads or for the health and safety of the public.

1.3 Relocation -- If any part of an installation interferes with the present use of roads by the general public or is in conflict with future or current City improvement projects, it shall be removed or relocated as directed by the City at the expense of the Permittee or his successor in interest.

1.4 Utility Construction -- Permits for utility trenching, including utility service trenching, within City right-of-way, shall be issued to the respective utility purveyor or a California licensed contractor. The Permittee shall warranty the trench repair in perpetuity.

1.5 Licensed Contractor -- All excavation, repair and restoration in City road right-of-way shall be performed by a contractor with the appropriate license issued by the State of California Contractors License Board or by utility purveyor's regular employees.

1.6 Permit Possession -- Other than emergency repairs, there shall be no work performed in City road right-of-way until an encroachment permit is issued. A copy of this permit, a set of approved plans and permits required by any other legally constituted authority shall be on site at all times construction is in progress. Permits that require excavation shall be valid only after an Underground Service Alert (USA) inquiry identification number is issued if an excavation is to take place.

1.7 Permittee Responsibility -- In addition to all conditions herein, the Permittee is responsible for safety and construction requirements within the limits of the project. The Permittee and his employees shall abide by all the regulations of any legally constituted authority.

1.8 Hold Harmless -- The Permittee shall preserve and save harmless the City and each officer and employee thereof, from any liability or responsibility for any accident, loss or damage to persons or property happening or occurring as a proximate result of Permittee’s negligence or the negligence of Permittees' agents, servants, employees or contractors in the design or performance of any work undertaken under any permit granted to Permittee pursuant to the application.

1.9 Notification -- Except in emergencies, the Permittee shall notify the City one working day, excluding weekends and holidays, prior to starting a project and for each phase of construction.

In addition, the Permittee shall notify USA 48 hours prior to any excavation.

1.10 Inspection -- All construction performed in relation to a road permit shall be inspected prior to and during installation by City personnel. Construction performed without inspection Redlands Regular Meeting of 03-04-2025 1050 of 1100
2 may be subject to removal and replacement. The entire cost of removal and replacement shall be borne by the Permittee, regardless of whether the installation removed was found to be defective.

1.11 Failure To Comply -- Should a Permittee fail to comply with the provisions of the encroachment permit or the requirements of any legally constituted authority, the City Engineer may order the Permittee to stop work, wholly or in part, until the discrepancies have been resolved to the City's satisfaction. Upon satisfactory completion of corrections, written approval from the City shall be required before work may resume. Failure to comply with this requirement shall result in revocation of permits. The City may perform work required or arrange for the work to be done and the entire cost of the required work shall be borne by the Permittee. 2 - PUBLIC CONVENIENCE AND SAFETY

2.1 Traffic and Access -- The Permittee's operation shall cause no unnecessary inconvenience to the public. The access rights of the public shall be considered at all times and unless otherwise authorized, traffic shall be permitted to pass through the work area at all times. Safe and adequate pedestrian and vehicular access shall be provided and maintained to fire hydrants, residences, commercial and industrial establishments, churches, schools, parking lots, service stations, motels, fire and police stations, hospitals, and establishments of similar nature. Access to these facilities shall be continuous and unobstructed unless otherwise approved by the City Engineer.

2.2 Traffic Control -- Traffic Control shall conform to the current Work Area Traffic Control Handbook (WATCH) or other traffic control manuals may be used with approval of the City Engineer.

2.3 Working Hours -- Except for emergency repairs, no work shall be performed within City road right-of-way on weekends, City holidays, before 7 AM or after 4 PM unless authorized by the City Engineer.

2.4 Dewater Operations -- Release of, or the directing of water onto City roads shall be authorized only by the City and shall include traffic control per Section 2.2, clean-up per Section

4.1 and erosion control. If erosion occurs, grading shall be as required in Section 5.4. Discharges shall comply with the National Pollutant Discharge Elimination System (NPDES) and with federal law, state law and local ordinance.

2.5 Closing Roads -- No road shall be closed without authorization from the City Engineer except in the case of an emergency. An authorized road closure will allow the detour of through traffic only. The Permittee shall provide a smooth dust controlled route that allows unimpeded access for emergency vehicles and residents at all times. A minimum of ten (10) working days are required to process the application.

To apply for a road closure authorization, submit the following to the City of Redlands One Stop Permit Center, 35 Cajon Street Suite 15A, Redlands, CA 92373. • Written request for the closure with the time schedule included. • Detour route and sign locations, a detour plan designed by a Registered Civil or Traffic Engineer, if required by the City.

Redlands Regular Meeting of 03-04-2025 1051 of 1100
3 3 - PRESERVATION OF PROPERTY

3.1 Protection of Property -- The Permittee shall be responsible for the protection of public and private property adjacent to the work and shall exercise due caution to avoid damage to such property.

The Permittee shall repair or replace all existing improvements damaged within the right-of-way which are not designated for removal on the approved plans to match the original in finish and dimension. Trees, lawns and shrubbery that are not designated for removal on the plans shall be protected from damage or injury. If damaged or removed because of the Permittee operations, they shall be restored or replaced in as nearly the original condition and location as is reasonably possible as approved by City personnel. The Permittee shall give seven (7) days notice to occupants or owners of adjacent property to allow them to salvage or relocate plants, trees, fences, sprinklers and other improvements within the right-of-way which are designated for removal on the plans and would be destroyed because of the work.

3.2 City Facilities -- Prior to construction, the Permittee shall assess the condition of City facilities within project limits and report to the inspector all damaged, defaced or missing pavement, sidewalk, curb, gutter, traffic signs, pavement markings or hazardous conditions that may exist before work is started. Prior to final acceptance of the project, all City facilities shall be in the same or better condition as determined by City personnel.

3.3 Traffic Signals -- Traffic signal detector loops, wiring or appurtenant facilities damaged by the Permittee's operation shall be reported immediately to the City. Any damage shall be repaired immediately at no expense to the City as directed by the City.

3.4 Survey Monuments -- The Permittee shall locate, protect or tie-out all survey monuments which may be disturbed or destroyed. Survey monuments shall be located, referenced and a Corner Record filed with the County Surveyor prior to the start of construction. Following completion of the work, the monuments shall be reset in the surface of the new construction, a suitable monument box placed thereon, or permanent witness monuments set and a Corner Record filed with the County Surveyor prior to final project notice of completion issued by the City. All work shall be performed under the direction of a licensed Land Surveyor or registered Civil Engineer at no expense to the City.

3.5 Underground Service Alert Markings -- All Underground Service Alert (USA) markings shall be accomplished by the use of marking chalk only. It shall be the responsibility of the Permittee to verify the use of marking chalk when requesting USA services. Any USA markings resulting from Permittee activity shall be removed by sandblasting, sodablasting or water blasting ensuring all NPDES regulations are complied with. Markings must be removed by the Permittee within thirty (30) days from the completion of construction at no expense to the City.

If the Permittee fails to remove the markings within the 30 days, the City will remove the markings. The Permittee will be responsible for all costs incurred by the City in accordance with Section 12.20.170 of the City of Redlands Municipal Code. If damage to existing improvements occurs during the removal of USA markings, it shall be repaired to the original condition by the Permittee and approved by the City. Utilizing paint to cover over markings will not be accepted.

Redlands Regular Meeting of 03-04-2025 1052 of 1100
4 4 - PROJECT SITE MAINTENANCE
Surplus dirt, debris, rocks or building materials shall be contained during permit work and the site broomed daily to reduce possibility of being carried by runoff into a storm drain, stream or natural drainage course or lake. At the completion of the permit work, the previous drainage patterns must be restored. Material shall not be placed in such a manner which might result in the blockage of any drainage structure at either the inlet or outlet.

4.1 Clean-up and Dust Control -- Throughout all phases of construction, including suspension of work, the Permittee shall keep the work site clean and free from rubbish and debris. The Permittee shall also abate dust nuisance by cleaning, sweeping and sprinkling with water or other means as necessary. The use of water resulting in mud on roads or drainage facilities will not be allowed as a substitute for sweeping or other cleaning methods. All soil and construction material shall be removed prior to that portion of the road being made available to traffic.

4.2 Truck Routes -- When required by the City, obtain a truck route permit before beginning work. Permits are issued approximately five (5) working days after filing of proper plans, fees and application to the City. Care shall be exercised to prevent spillage on, or damage to City roads. Any such spillage or damage shall be removed or repaired immediately. Dust control and traffic control shall be provided for all hauling operations.

4.3 Storage in City Roads -- There shall be no equipment or materials stored or stockpiled in road right-of-way. Equipment and materials shall be removed from road right-of-way when not in use and at the end of each working day, except as approved by the City Engineer. Offsite storage locations must be approved by City and property owner prior to occupation of the site.

4.4 Emergency Response -- Before work is started, the Permittee shall furnish names and telephone numbers of persons on-call if emergency work is required by the City. The City, at its sole discretion, may elect to perform emergency work if it is judged as necessary for the protection of the roads or for the health and safety of the public. All emergency work shall be accomplished at no expense to the City.

4.5 Maintenance of Trenches -- Permittee shall perform continuing maintenance of all trenches, including periods of suspension of work, during the course of construction and shall maintain the trench for the life of the installation.
5 - MATERIALS AND EQUIPMENT

5.1 Pavement Traffic Markings and Striping – All damaged or removed pavement traffic markings and striping shall be replaced in kind within calendar 14 days from the completion of resurfacing operations. If the Permittee fails to replace damaged striping or markings within calendar 14 days, the City will complete the work and the Permittee will be responsible for all costs incurred by the City in accordance with Section 12.20.10 of the City of Redlands Municipal Code.

Visual uniformity, as determined by City personnel, may require that adjacent markings, additional length of marking on each side or all markings within an intersection be replaced by Redlands Regular Meeting of 03-04-2025 1053 of 1100
5 the Permittee at no cost to the City. Partial replacement of transverse markings (i.e. stop bars, crosswalks) will not be allowed and must be replace in entirety.

5.2 Asphalt Concrete -- Paving asphalt shall be C2 or D1 – PG 64-10 (1/2” or 3/8”) for finish paving, depending on overlay thickness, and B – PG 64-10 (3/4”) for base paving. Asphalt concrete for Type D1 or Type D2 curb shall be D2 - PG 70-10.

5.3 Rubberized Asphalt Concrete – Rubberized asphalt concrete shall be Asphalt Rubber Hot Mix (ARHM) Wet Process per City of Redlands Standards and Standard Specifications for Public Works Construction (Greenbook), latest edition.

5.4 Base Material -- Base material shall be Crushed Aggregate Base (CAB), Crushed Miscellaneous Base, Fine Mix (CMB) per Greenbook, latest edition or Class 2 Base (3/4” Max,) per 2010 Caltrans Specifications or as approved by City personnel.

5.5 Grading Equipment -- Grading of soil roads or soil shoulders may be accomplished by any means that will provide a smooth, compacted and uniform surface that varies less than 0.1 foot in 10 feet for line or grade up to 300 feet. Projects greater than 300 feet in length will require grading be performed by an approved motor grader.

5.6 Track Equipment -- Track equipment and outriggers used on paved surfaces shall be equipped with street pads and be operated so as not to mar the surface or cause damage to any City facility. If pavement is marred, it shall be resurfaced over the entire width as required in Section 8, Trench Resurfacing. If City facilities are damaged, they shall be replaced or repaired as specified in Section 3, Preservation of Property.

5.7 Equipment -- Paving 6 feet wide or wider in a driving lane shall be accomplished by use of a paving machine approved by City personnel. Shoulder paving and miscellaneous paving shall be as approved by the City.
6 – TRENCHING

6.1 Definition of Trenching -- Trenching shall be defined as any operation in which asphalt pavement, concrete pavement, earth, or other material on the surface is moved, removed, or otherwise displaced by means of hands, tools, or equipment in any of the following ways:
trenching, digging, ditching, drilling, augering, tunneling, cutting or any other method not specified.

6.2 CalOSHA -- All excavations shall conform to the requirements of the State of California Division of Occupational Safety and Health. The applicant for a road permit shall possess a permit to excavate from the Division of Industrial Safety, Department of Industrial Relations, State of California.

6.3 New Roads – Per Section 12.20.030 of the City of Redlands Municipal Code, there shall be no trenching activity on streets paved or resurfaced within the previous 5 years unless otherwise authorized by the City Engineer. If authorized, the Permittee shall be required to overlay the roadway to restore it to its original condition per Standard Drawing Number 193, Trench Overlay Detail or complete repair improvements as determined by City Engineer. To determine Redlands Regular Meeting of 03-04-2025 1054 of 1100
6 if a street is subject to a moratorium, visit https://www.cityofredlands.org/post/encroachmentpermits and access the Moratorium Streets Map. The map is updated regularly, however if conflicts or questions arise please contact the One Stop Permit Center at (909) 798-7551.

6.4 Pavement Removal -- Paving shall be cut for removal and excavated in a manner that does not disturb the adjacent pavement. Paving shall be sawcut or cold planed for permanent repair as specified in Section 8. Remnant strips of paving less than 5 feet wide shall be removed and included in the replacement paving. Replacement paving along the edge of paving that does not have curb and gutter, AC dike or AC berm shall be a minimum of 5 feet wide. When sidewall slippage occurs within the trench under the pavement, the pavement in the affected area shall be removed and the area of slippage shall be recompacted, paving of this area shall be included in the replacement paving. Any voids under the pavement shall be filled by an appropriate method approved by the inspector.

6.5 Open Trench -- The maximum length of open trench (excavation or backfill not resurfaced) allowed during construction shall be the distance of construction which can be reasonably installed in a single day. An open trench shall be attended by contractor's personnel at all times.

Where pavement has been removed, a minimum of 2 inches of temporary paving shall be placed before that area is made available to traffic. Before leaving the project and at the end of each day, all areas of pavement removal, including sidewalk, drainage courses and driveway approaches shall be backfilled, compacted and surfaced with temporary asphalt. Upon approval of the City, appropriate areas of the trench may be protected by plate bridging or protective fencing.

6.6 Trench Bridging -- Plate bridging in the traveled way shall be per Standard Drawing Number 194, Plate Bridging Detail detail herein with traffic control per Section 2.2, Traffic Control.

6.7 Protective Fencing -- When protective fencing is used to secure an area, it shall be constructed of 6 foot high, pipe framed chain link panels or equal material, secured into position and placed in a manner that there are no gaps larger than 3 inches. Fencing shall be placed a minimum of 4 feet from the nearest driving lane and shall be protected by appropriate signing and barriers per Section 2.2, Traffic Control.

6.8 Trench Backfill -- Unless otherwise specified by the City, the trench shall be backfilled with Base Material, as defined within Section 5.4. Native soil backfill will not be allowed as backfill material and shall be disposed of at the cost of the Permitee. The backfill shall be installed per Standard Drawing Number 191, T-Cut Trench Repair.

Any trenching that involves bundled conduits of more than five (5) 2 inch conduits shall be slurry backfilled with 1-1/2 sack slurry.

6.9 Bedding Zone -- Unless otherwise specified by the City, imported sand shall be used backfill within the bedding zone area as defined on the attached surface restoration and trench backfill detail. Select native soil from excavation may be used as a suitable backfill if the material is determined to provide a sand equivalent greater than 30 by use of California Test 217 (ASTM D2419-09).

Redlands Regular Meeting of 03-04-2025 1055 of 1100
7 6.10 Narrow Trench -- Unless otherwise authorized, trenches in paved areas, 1-foot or less in width, shall be backfilled to pavement subgrade with 1-1/2 sack aggregate/cement slurry. The slurry shall be protected until cured and pavement placed per Section 8, Trench Resurfacing.

6.11 Inclement Weather -- Other than emergency repairs or as directed by the City, there shall be no excavation within the traveled way of City roads during periods of inclement weather. 7 - COMPACTION

7.1 Relative Compaction (RC) -- RC of 95% minimum shall be required for asphalt pavement, paving base material and backfill material. RC of 90% minimum shall be required for all backfill within the bedding zone as defined in Section 6.9. All compaction shall be in accordance with California Test No. 216 or No. 231 (ASTM D-1556 or D-1557-70). Use of an alternate compaction test method (e.g. Dynamic Cone Penetrometer) must be approved in advance and will be approved on a case-by-case basis.

7.2 Compaction Testing Frequency and Location -- Trench backfill testing shall be at 250 foot maximum intervals. One test shall be performed for each 4 feet of depth or fraction thereof.

Pavement subgrade and pavement base material shall be tested at 500 foot intervals. Tests for backfill shall be taken at mid-depth of each 4 feet of backfill starting at the top of the installation. 20% of laterals and 100% of manholes shall be tested independently of the main line. Failure of a compaction test will result in the entire area represented by that test being uniformly reworked and retested at a random location.

7.3 Test Reports -- Tests shall be certified by a registered California Civil or Geotechnical Engineer or testing laboratory in accordance with the State of California test requirements. Test locations shall be determined by City personnel. Test reports shall be listed individually for each trench or for each type and phase of construction that includes an accurate description of the test location. Compaction reports shall be submitted to Inspector prior to permanent paving. If an alternate compaction method is approved per Section 7.1, alternate test reports specified at time of permit issuance shall be submitted.

7.4 Mechanical Compaction -- Backfill shall be placed in horizontal layers of thickness compatible to the material being placed and the type of equipment being used. Each layer shall be evenly spread then tamped or rolled until the specified relative compaction is attained.

7.5 Water Densification -- Densifying by ponding and jetting will not be allowed within 4-feet of finish grade unless confined to the pipe zone and approved by the Inspector. Water densification may be allowed when, as determined by City personnel, the base and backfill materials have a sand equivalent of 20 or greater (California Test No. 217) and are of such character that they will be self-draining when compacted and the foundation material will not soften, or otherwise be damaged by the applied water. For authorization to use water densification, submit request and test reports representing the foundation soils and backfill material, at a maximum of 1000 foot intervals to the Inspector five (5) working days prior to starting work.

Redlands Regular Meeting of 03-04-2025 1056 of 1100
8 8 - TRENCH RESURFACING

8.1 Temporary AC Pavement -- Temporary asphalt compacted to 2 inches thick shall be placed and maintained in a smooth and compacted condition at all locations where paving has been removed and before traffic is allowed to pass over areas of pavement removal. Temporary asphalt shall be removed for permanent repair.

8.2 Pavement Repair-General – Any damaged paving shall be replaced in kind. Permittee shall ensure any areas with existing rubberized asphalt concrete are repaired with rubberized asphalt concrete, independent of the amount of repairs necessary. Damaged paving adjacent to the trench edges shall be sawcut and removed in rectangular sections. Remnant strips of paving 5 feet wide or less will be removed and that area included in the paving repair. Asphalt paving shall be placed in a minimum of two lifts and be a minimum of 95% RC. The repaired section shall be 1 inch thicker than the existing paving but not less than 3 inches thick. Paving shall be placed within thirty (30) days of completion of the subsurface installation in accordance with Section 1.5. Areas to be joined with asphalt paving shall be cleaned of all soil and foreign material and tacked 100% coverage of asphaltic emulsion or paint binder.

8.3 Permanent Pavement Repair -- Base paving will be in compacted lifts a minimum of 2 inches and a maximum of 3 inches thick and shall be B – PG 64-10 (3/4”). Finish course shall be a minimum of 1 inch and a maximum of 2 inches thick of C2 or D1– PG 64-10 (1/2” or 3/8”), depending on overlay thickness, flush with the existing paving. In areas requiring rubberized asphalt concrete pavement repair the entire pavement section shall be replaced with ARHM Wet Process, per Section 5.3. Trench sections over 6 feet in width shall utilize a self-propelled vibrating screed paving machine (Barber-Greene or equivalent) and may be subject to additional requirements.

8.4 Overlay Paving -- An overlay will be required for any roads paved or resurfaced within the previous 5 years per Section 6.3, New Roads. Any roads with trenches that are classified as excessive pavement removal, as defined in Section 8.5, will also be required to provide an overlay per Standard Drawing Number 193, Trench Overlay Detail. The determination of the overlay shall be made by the City at the prebid/preconstruction meeting or prior to issuance of the permit. Substantial damage to the roadway beyond the trench excavation as a result of negligence by the Permittee or their contractor shall meet or exceed prior street conditions and will be determined by the City. The overlay, when required, shall be a minimum of 1 inch or 1- 1/2 inches of C2 or D1 – PG 64-10 (1/2” or 3/8”), depending on overlay thickness, placed with a paving machine per Section 5.6 and shall extend beyond pavement removal a minimum of 18 inches laterally and 18 inches longitudinally from the sawcut edge and shall cover the driving lane or shoulder full width. Roads that have a superelevation or tilt cross section may require full road width overlay in the area of the superelevation or tilt section. When paving occurs where striping exists the paving joint shall be centered on the striping and all damaged striping replaced per Section 5.1, unless otherwise noted.

8.5 Excessive Pavement Removal -- Any road subjected to removal of six or more separate areas of pavement, or the removal of 15% of the total area of a lane or shoulder, by a Permittee within a 300 foot length of street, shall be classified as excessive pavement removal and require an overlay per Section 8.4 and Standard Drawing Number 193, Trench Overlay Detail. Any trenching activities performed within 1 year, within a 300 foot length, by the same Permittee, Redlands Regular Meeting of 03-04-2025 1057 of 1100
9 shall be evaluated by City staff to determine if the trenching activities classifies as excessive pavement removal.

8.6 Pavement Surfacing -- Where there are existing surface coats on the existing paving, open graded paving, slurry seal, chip seal or any type of surfacing that has been removed, the surfacing and paving shall be replaced in kind to the extents of the pavement repair.

8.7 Driveway Approaches -- Driveway approaches constructed of asphalt concrete shall be repaired as required and shall also be overlaid with a 1-1/2 inch thick full width overlay to the property line or slurry sealed.

8.8 Portland Cement Concrete -- Potholes or trenches in PCC shall be repaired by sawcutting or grinding and removed in full panels at the score lines or as directed by City personnel.

8.9 Trench Failure and Repair -- When the City notifies Permittee of a failure of the trench (settlement, excessive cracking or alligatoring, etc.) Permittee shall coordinate the proposed trench repair method and schedule with the City. If the Permittee fails to repair the trench within calendar 14 days from the date of written notice, the City will complete the repair and the Permittee will be responsible for all costs incurred by the City in accordance with Section

12.20.170 of the City of Redlands Municipal Code.

Redlands Regular Meeting of 03-04-2025 1058 of 1100
10 THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1059 of 1100
11 STANDARD DRAWINGS
Std. Dwg. No. Title
190 Trench Repair General Notes
191 T-Cut Trench Repair
192 Butt Joint Trench Repair
193 Trench Overlay Detail
194 Plate Bridging Detail
Redlands Regular Meeting of 03-04-2025 1060 of 1100
12 THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1061 of 1100

TRENCH REPAIR GENERAL NOTES

TRENCH REPAIR GENERAL NOTES
190

CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Redlands Regular Meeting of 03-04-2025 1062 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1063 of 1100

T-CUT TRENCH REPAIR
191

CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT NOTES

GRIND AND OVERLAY THICKNESS
Redlands Regular Meeting of 03-04-2025 1064 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1065 of 1100

BUTT JOINT TRENCH REPAIR
192

CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT NOTES
Redlands Regular Meeting of 03-04-2025 1066 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1067 of 1100

TRENCH OVERLAY DETAIL
193

CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT

SINGLE LANE/SHOULDER OVERLAY

MULTIPLE LANE/SHOULDER OVERLAY
NOTES
Redlands Regular Meeting of 03-04-2025 1068 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1069 of 1100

PLATE BRIDGING DETAIL
194

CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT NOTES
Redlands Regular Meeting of 03-04-2025 1070 of 1100
NOTES

PLATE BRIDGING DETAIL
194

CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Redlands Regular Meeting of 03-04-2025 1071 of 1100
Redlands Regular Meeting of 03-04-2025 1072 of 1100
Redlands Regular Meeting of 03-04-2025 1073 of 1100

APPENDIX E

CITY OF REDLANDS

CONTRACTOR SAFETY PROGRAM
Redlands Regular Meeting of 03-04-2025 1074 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1075 of 1100

THE CITY OF REDLANDS

CONTRACTOR SAFETY

PROGRAM
Rev. June 15, 2021
Redlands Regular Meeting of 03-04-2025 1076 of 1100

TABLE OF CONTENTS
I. POLICY......................................................................................................................3 II. AUTHORITY..............................................................................................................3 III. SCOPE.....................................................................................................................3 IV. DEFINITIONS...........................................................................................................3 V. RESPONSIBILITIES ....................................................................................................4 RISK MANAGEMENT... …………………………………………………………………………………………………………4 PROJECT MANAGER (CITY)……………………………………………………………………………………………………..5 INSPECTOR (CITY)………………………………………………………………………………………………………………..5 EMPLOYEES (CITY)……………………………………………………………………………………………………………….5 CONTRACTOR…………………………………………………………………………………………………………………….5 PROJECT SAFETY OFFICIAL……………………………………………………………………………………………………..6 VI. PROGRAM ..............................................................................................................6 SAFETY PREQUALIFICATION QUESTIONNAIRE……………………………………………………………………………..6 APPEAL PROCESS…………………………………………………………………………………………………………………7 CONSTRUCTION PROJECTS (TIER I AND TIER II)…………………………………………………………………………….8 INSPECTIONS……………………………………………………………………………………………………………………..9 TRAINING/DOCUMENTATION………………………………………………………………………………………………...9 NON-COMPLIANCE………………………………………………………………………………………………………………9 CITY PERSONNEL………………………………………………………………………………………………………………….9 VII. RECORDKEEPING………………………………………………………………………………………………….10 VIII. ADDITIONAL REFERENCES ...................................................................................10 ACKNOWLEDGMENT OF RECEIPT (A)……………………………………………………………………………………….11 SAFETY PREQUALIFICATION QUESTIONNAIRE (B)………………………………………………………………………..12 NOTICE OF NONCOMPLIANCE (C)…………………………………………………………………………………………..13 JOB HAZARD ANALYSIS (D)……………………………………………………………………………………………………14 INCIDENT INVESTIGATION FORM (E)………………………………………………………………………………………..15 Redlands Regular Meeting of 03-04-2025 1077 of 1100
3 I. Policy

CONTRACTOR SAFETY PROGRAM
The purpose of this Contractor Safety Program (“CSP”) is to ensure, as best as reasonably possible, the protection and safety of all persons and property during construction activities undertaken by private contractors on behalf of the City of Redlands (“City”). The City has a comprehensive and structured approach in outsourcing services performed on City facilities by third-party persons and entities (“Contractor(s)”). The first phase of this comprehensive approach includes actively screening Contractors based on safety records, safety performance, and safety compliance. After the qualified Contractor is awarded a contract, the Contractor must then ensure compliance with all local, state, federal and Cal/OSHA regulations applicable to the contracted scope of work, and requirements set forth within this CSP. The Contractor, its agents, and personnel must adhere to the policies and procedures set forth by this CSP and all applicable laws and regulations.

II. Authority
California Code of Regulations, Title 8, Section 336.10 “Determination of Citable Employer” California Code of Regulations, Title 8
“Greenbook” Standard Specifications for Public Works Construction Redlands Municipal Code
California Building Code
III. Scope
This CSP applies to all Contractors who provide or render construction or improvement services for Cityowned property and facilities.

The Contractor services covered under this CSP include, but are not limited to, the following:

A. New construction;
B. Remodeling;
C. Facility maintenance orrepair;
D. Equipment installation or maintenance; and
E. Services (i.e. janitorial, fleet operations, landscaping,etc.) Consultants/ Professional service providers are exempt from having to submit a Safety Prequalification Questionnaire (“SPQ”), prior to the beginning of work, but they are expected to be compliant with industry best practices with regards to maintaining a safe work environment for their employees and others.

IV. Definitions
A. Contract – any written agreement between the City of Redlands and a Contractor, to perform a specified scope of work on City facilities. With respect to this policy, a contract includes, but is not limited to: awarded purchase orders, bids, and/ or project contracts.

B. Construction Work – construction, alteration, and/or repair, including painting anddecorating.

C. Contractor – a person or entity (including all personnel) awarded a contract to perform work on City property or facilities.

D. D.A.R.T Rate – Injuries and illnesses severe enough to warrant: Days Away, Restrictions and Transfers. The DART rate is calculated using the following formula: Number of OSHA Recordable injuries and illnesses that resulted in Days Away x 200,000/divided by total hours worked by all employees during the year covered.

Redlands Regular Meeting of 03-04-2025 1078 of 1100
4 E. Designated Work Area – an area where it is necessary to restrict or limit entry or access of nonessential personnel or the public. Examples include work areas involving remediation abatement, demolition, excavation, and overheadlifting.

F. Facilities – any building or property owned by the City of Redlands.

G. Hazard – source or situation with a potential for harm in terms of injury or health, damage to property, damage to workplace environment, or a combination ofthese.

H. Job Hazard Analysis (“JHA”) – a technique that focuses on job tasks as a way to identify hazards before they occur. It focuses on the relationship between the worker, the task, the tools, and the work environment. The objective is to eliminate the risk or to utilize control measures to reduce the risk.

I. North American Industry Classification System (“NAICS”) – is the standard used by Federal statistical agencies in classifying business establishments for the purpose of collecting, analyzing, and publishing statistical data related to the U.S. businesseconomy.

J. Non-compliance – any deviation from standards, practices, processes, procedures, regulations etc. that could either directly or indirectly lead to injury or illness, property damage, damage to the workplace environment, or any combination of thesecriteria.

K. Notice of non-compliance – form provided to the Contractor by the City alerting the contractor of non-compliance with City specifications, Cal/OSHA regulations, or any other generally accepted safe work practice.