L. Non-compliant hazardous work condition – any hazard that is considered to be non-compliant with State or Federal safety and health regulations, City specifications, or any inconsistency with generally accepted work practices.

M. Personnel – all Contractor employees, contractors, sub-contractors and agents providedaccess to City property or facilities.

N. Recordable Incident – any injury or illness resulting in death, days away from work, restricted work or transfer to another job, medical treatment beyond first aid, or loss of consciousness per OSHA Section 1904.7(a).

O. Safety Tailgate – informal safety meeting generally conducted at the job site prior to the commencement of a job or work shift.

P. Services – any and all, labor, duties, functions and activities required to be performed by the Contractor under the contract and any subsequent addenda.

V. Responsibilities

RISK MANAGEMENT
A. Update, maintain, and administer this CSP;
B. Maintain centralized records of training, site visit data, written programs, tailgate meetings, permits, and all other necessary contractor relateddocumentation;
C. Provide technical assistance to Engineeringpersonnel; D. Attend Pre-construction meetings and progress meetings asneeded; E. Provide assistance on safety inspections as needed;
F. Review safety submittals;
G. Provide guidance on pre-qualification determination; and H. Provide training to affected city personnel with responsibilities under thisprogram.

Redlands Regular Meeting of 03-04-2025 1079 of 1100
5 PROJECT MANAGER (CITY)
The Project Manager has the authority to delegate any or all portions of this CSP to subordinates, but the Project Manager will be held accountable for their compliance. The Project Manager shall contact Risk Management, as necessary, for assistance in relation to this CSP.

A. Ensure safety hazards are addressed in a timelymanner; B. Communicate safety concerns during pre-construction meetings and progressmeetings; C. Inform impacted employees of construction activities scheduled in their workarea; D. Enforce pre-qualification procedures in bidding process; and E. Ensure this CSP is properly executed.

INSPECTOR (CITY)
The City of Redlands construction inspector is not a safety professional and will only provide “Notice of NonCompliance” for obvious and serious non-compliant conditions.

A. To the best of their abilities, inspect work sites for safetyhazards; B. Communicate safety concerns to Contractor;
C. Provide Contractor with “Notice of Non-Compliance” when serious conditions occur or repeatviolations; D. Collect documentation needed for construction worksites; E. Submit documentation to Risk Management forrecordkeeping; F. Maintain photo documentation of safety hazards;
G. Never enter situations that can harm or endanger himself/herself; H. Never use personal protective equipment (PPE) or enter situations, which they are not trainedfor; I. Contact Emergency Medical Services (911) and Risk Management in case of emergency;and J. Attend and communicate safety concerns in progressmeetings.

EMPLOYEES (CITY)
A. Immediately notify the Project Manager, inspector, or Risk Management of any safety related concerns at a Contractor job site; and
B. Contact Emergency Medical Services (911) and Risk Management in case ofemergency.

CONTRACTOR
Where relevant and applicable, the Contractor’s responsibilities shall include:

A. Compliance with requirements and responsibilities detailed within the Contractor Safety Program; B. Ensure all local regulatory requirements are met and all necessary permits are obtained before conducting work on behalf of the City;
C. Designate a Project Safety Official by name who shall be available at all times to abate safety hazards; D. Ensure all personnel have the appropriate qualifications and training to perform the contracted work (Copies of current training documentation and certifications must be on file with theCity); E. Inform City Project Manager or inspector of any job site safety hazards orconcerns; F. Inform City Project Manager if any suspected asbestos-containing material islocated; G. Conduct and submit Job Hazard Analysis (JHA) before work and as required by change of tasks; H. Conduct and submit Safety Tailgates on a bi-weekly basis; I. Provide all required PPE necessary to conduct work safely and in accordance with required local regulations;
J. The safety of all individuals who enter work site;
K. Spill cleanup;
L. Immediately report any incidents, accidents, near misses, unsafe conditions, or unsafe acts involving any jobsite personnel;
Redlands Regular Meeting of 03-04-2025 1080 of 1100
6 M. Arrange for the proper storage and removal of waste generated prior to the completion of job, and provide confirmation that the materials have been removed or disposed of in a manner compliant with all applicable environmental regulations;
N. Removing all equipment used during work activities and ensuring proper housekeeping of designated work area at the end of each workday and upon completion of the job; O. Contact Emergency Services (911) and Project Manager in the event of an emergency; and P. For the actions of their subcontractors, as they may pertain to this CSP, including their adherence to its contents and review of this document.

PROJECT SAFETY OFFICIAL (CONTRACTOR)
A. Shall be at the work site at all times;
B. Must be thoroughly familiar with the Contractor’s Injury and Illness Prevention Program (IIPP) and Code of Safe Practices;
C. Shall be available at all times to abate any potential safety hazards;and D. Shall have the authority and responsibility to shut down an unsafe operation, if necessary.

VI. Program

SAFETY PREQUALIFICATION PROCESS
A. The safety prequalification process is intended to:
• Provide the City with knowledge of past and current safety performance of Contractors working on City construction projects;
• Improve Contractor compliance with City safety rules, including safe work practices required by applicable regulations and laws; and
• Improve safety during Contractor activities.

B. A copy of the SPQ shall be provided to each person or entity bidding on a project, as part of the bidding process.

C. The completed questionnaire shall be returned and reviewed prior to awarding contract work, with supporting information provided as indicated by responses onquestionnaire.

D. The SPQ shall be submitted to: 35 Cajon St., Suite 4 Redlands Ca, 92373
Attention: Project Name-Contractor Name-SPQ
E. The following criteria and information relating to the Contractor will be reviewed prior to awarding contract:
• Contractor License;
• Incident Rates;
• OSHA Citations;
• Safety Policies;
• Safety Programs and Procedures;
• Compliance History on City Projects; and
• Certification Statement.

F. Contractor must qualify in each section to be approved for award of acontract.

G. If a Contractor fails to pass prequalification procedure, the City has the right to disqualify the Contractor’s proposal.

Redlands Regular Meeting of 03-04-2025 1081 of 1100
7 H. All costs associated with compliance with City of Redlands prequalification requirements shall be at the sole expense of the Contractor.

I. If a Contractor provides information that is later determined to be false, or improperly withholds information, the Contractor will be immediatelydisqualified.

J. Any questions or information relating to filing this questionnaire may be answered by reaching:
• Engineering: (909) 798-7698; or
• Risk Management: (909) 798-7514

DISQUALIFICATION APPEAL PROCESS
This provision is established pursuant to Public Contract Code section 20101(d) which requires every public agency that requires prospective bidders to prequalify pursuant to the law to establish “a process that will allow prospective bidders to dispute their proposed prequalification rating prior to selection of an alternate bidder.” If the City intends to disqualify a bidder based upon the bidder’s safety record, the City will notify the bidder in writing and provide the bidder with any supporting evidence that has been received from others or adduced as a result of an investigation by the City. The notice of intention shall be sent by certified mail with return receipt requested or by overnight mail via a delivery service that provides online tracking which identifies the date of the prospective bidder’s receipt of the notice, and shall include notice that the bidder has the right to, and may request a hearing to rebut any evidence used as a basis for disqualification and to present evidence to the City as to why the prospective bidder should be found qualified. Requests for a hearing must be made by written request to the City within ten calendar days of the date of the prospective bidder’s receipt of the City’s notice of intention. If the bidder does not request a hearing within the time allowed, the City’s determination shall stand unchallenged and become final.

Within seven calendar days of receiving the bidder’s request for a hearing, the City shall notify the bidder in writing of the date, time and place of the hearing. The hearing shall be held no sooner than ten (10) calendar days and no later than fifteen (15) calendar days after the notice is given. The notice shall inform the bidder of its right to present testimony and documents in support of its position.

The hearing shall be conducted before the Redlands City Manager, which may be continued from time to time as reasonably determined by the City Manager, but shall not exceed forty five (45) days. At the conclusion of the hearing, and after considering all testimony and documentation presented, the City Manager shall issue a written decision no later than five calendar days following the hearing. The City Manager’s decision shall be final and is not subject to further appeal to the City.

The bidder shall not be entitled to bid on any contracts with the City until it has met the safety pre-qualification standards. If the City Manager approves an appeal, the contractor will have been deemed to meet the qualification standards and it will be valid for one year. The bidder shall have the right to withdraw its application for prequalification or its appeal at any time before the City Manager’s decision becomes final. Such withdrawal will not preclude the bidder from re-applying for prequalification.

CONSTRUCTION PROJECTS
A. After a contract is awarded, the Contractor shall maintain, throughout the duration of the project, safety measures as necessary to protect the public and workers within, or in the vicinity of, the designated work zone. This includes an evaluation of the work to be performed and the hazards likely to be encountered.

Contractors are expected to follow, at a minimum, all pertinent laws, rules and regulations for the location in which they will be working. Where applicable, Contractor Safety Programs will meet or exceed City programs/ procedures and are subject to review and approval by the City prior to contractexecution.

Redlands Regular Meeting of 03-04-2025 1082 of 1100
B. Job Hazard Analysis(“JHA”)

1. Prior to a notice to proceed a JHA must be completed utilizing the City’s form, or equivalent, to assess the hazards present in the designated work area. Any information requested on the City’s form, but not stated on the equivalent form utilized, shall be provided separately with the original submission.

2. All members of the construction unit must sign the JHA to acknowledge hazard abatement procedures.

3. JHA must be kept at job site accessible to all impactedpersonnel.

4. Failure to follow JHA procedures may lead to termination of thecontract.

C. Personal Protective Equipment (“PPE”)

1. All required PPE must be worn at all times during work activities.

2. All mandatory PPE must be highlighted in the JHA.

3. PPE shall be provided by the Contractor.

4. Failure to follow PPE guidelines may lead to termination of thecontract.

D. Safety Tailgates

1. Safety Tailgate Meetings must be held on a biweekly basis for all constructionprojects.

2. The first meeting shall take place on Day 1, Week 1 and every other weekthereafter.

3. Tailgates shall be signed by all personnel and submitted to Construction Inspector for recordkeeping.

4. Tailgate topics should be specific to the scope of work of theproject.

E. Injury Reporting

1. Contractors shall immediately report injuries or accidents to the Project Manager (regardless of severity). Additionally, contractors are responsible for and must also conduct accident investigations of any injuries that occur on site and provide results to the ProjectManager.

2. Use the City Incident Investigation Form (Attachment E), or equivalent, to meetthis requirement.

F. Spill Prevention

1. The Contractor is responsible for any spill within the confines of the project and those outside of the construction limits caused by the Contractor’s defective equipment, containers, or personnel.

2. Secondary spill containment systems shall be used to prevent contamination of theenvironment.

G. Construction in Occupied Buildings

1. When building occupants are present during construction projects additional safeguards must be implemented to eliminate exposures and complaints. Dust/ particulates from demolition, sanding and other construction activities must be controlled by adequate ventilation, or containment and negative air ventilation systems based upon the specific type of activity and particle. Similar controls must be utilized for odorous activities including, but not limited to, carpet adhesive, painting, welding, and coatings.

2. The Contractor shall ensure that the HVAC system is protected in order to prevent contamination.

If an HVAC system is unprotected and contaminated by any construction/demolition materials, the Contractor shall be held responsible for the cost of cleaning the system and any subsequent repairs therein.

3. Negative air ventilation systems shall have appropriate filtration and be exhausted outside of the building.

INSPECTIONS
A. Follow up inspections will be executed to enforce compliance with safety and health requirements.

B. Follow up inspections will be conducted as part of routine site inspections by construction inspector and Risk Management employees.

Redlands Regular Meeting of 03-04-2025 1083 of 1100
C. The SPQ aims to provide the City with knowledge of Contractor safety history and safety practices. This minimizes the need for increased frequency of inspections. In addition, the City will take the following guidelines into consideration when determining frequency ofinspections.

1. Scale of project;

2. The frequency with which the number and types of hazards change as the workprogresses;

3. More frequent inspections will be implemented in the beginning of the project;and

4. When the Contractor has never worked for the City.

TRAINING/DOCUMENTATION
A. Contractor will ensure that all personnel are properly trained for the scope of work they are assigned, as well as the equipment they will be utilizing.

B. Documentation shall be on file with the City prior to projectstart.

C. Personnel missing training documentation shall not be permitted to work on awarded City projects.

D. Training requirements are mandated by Federal and State Regulations. This may include, but is not limited, to the programs listed in the SPQ.

NON-COMPLIANCE
A. Contractor compliance issues shall be documented on the “Notice of Non-Compliance” form. A copy of this form shall be provided to Contractor for completion.

B. Upon receipt of the completed “Notice of Non-Compliance” form, the Project Manager and Risk Management will evaluate, based on the incident, and identify, as appropriate, any additional corrective and/or preventive actions for completion.

C. If immediate correction is not feasible, the project will be temporarily stopped until the issue is adequately resolved.

D. City staff with authority to stop work are:

1. Construction Inspector;

2. City Project Manager;

3. City Manager; and

4. Risk Management staff.

E. Any violation or deviation from safety rules, procedures, or regulations, based on evaluation, may be subject to any and all disciplinary actions listed asfollows:

1. Verbal warning

2. Written warning-Notice ofNon-Compliance (work may not continue until approved corrections are implemented);

3. Dismissal of non-complying personnel; and/or

4. Termination of Contract.

The City of Redlands maintains the right to terminate any contract for the violation of safety issues without liability to the City.

CITY PERSONNEL
A. All affected City employees will be informed in advance of any construction related work or other contract work which has the potential for impacting their workplace. Notifications will be made to all affected employees via e-mail or written memo by the Project Manager or designee. Notifications must include the following information:

1. Start and end dates of the work to be completed;

2. Work areas to be affected;
Redlands Regular Meeting of 03-04-2025 1084 of 1100

3. Description of work to be completed;

4. Name and phone number of Project Manager;

5. Name and phone number of Construction Inspector; and

6. Name and phone number of Risk Management.

B. Employees should be instructed to notify Project Manager regarding logistical issues or other concerns.

Safety and Health concerns should be directed to either the Project Manager, Inspector, or Safety Specialist.

VII. Recordkeeping
The City’s Human Resources / Risk Management Department will maintain all records prepared in association with this CSP, with copies also place on file with the office of the City Clerk.

VIII. Additional References
https://www.dir.ca.gov/title8/336_10.html
Redlands Regular Meeting of 03-04-2025 1085 of 1100
11 City of Redlands
Acknowledgment of Receipt Statement
I acknowledge by signing this document, that I have received and reviewed the City of Redlands’ Contractor Safety Program and understand that it contains important information on the City’s policies and procedures regarding employee safety as it pertains to Contractor activities. Furthermore, I acknowledge that failure to comply with any of these procedures may lead to termination of the contract with the City.
____________________________ ______________________________ Contractor Signature Contractor Title:
______________________________________ ________________________________________ Contractor Name (Print) Date Signed
If you have any questions regarding this document, please contact the Risk Management Division at (909) 798-7514.

Attachment A
Redlands Regular Meeting of 03-04-2025 1086 of 1100
12 CITY OF REDLANDS

SAFETY PREQUALIFICATION QUESTIONNAIRE
SECTION 1 – GENERAL INFORMATION
Company Name:

Contractor License #: Expiration Date:

Address:

City: State: Zip Code:

Name of Person Submitting Application:

Title: Telephone #:

Email Address:

Identify the highest ranking Safety/Health Professional in your Company:

Name:

Title: Telephone #:

Omitting or reporting false information on this questionnaire may result in disqualification of bid.

The City of Redlands reserves the right to conduct random or for-cause audits of information stated in this questionnaire. If deemed necessary, additional documentation may be requested by the City to verify responses on this questionnaire.

Attachment B
Redlands Regular Meeting of 03-04-2025 1087 of 1100
13 SECTION 2 – INCIDENT RATES & WORKER’S COMPENSATION INFORMATION

INCIDENT RATES
Provide your actual injury and illness data below:

Provide the NAICS Code Number that best represents
your Firm:_____________________________
Provide any additional numbers here:
______________________________________
(Provide three full years of data) Last Calendar 2 Years Ago 3 Years Ago Number of hours worked by all employees:

Total Recordable Incident Rate*:

D.A.R.T. Rate*:

Total Number of Fatalities:

Incident Rate = [(Total Recordable Cases X 200,000 hours)/ Number of hours worked by all employees] D.A.R.T. Rate = [(Total Number of entries for Days Away, Restricted and Job Transfer X 200,000 hours)/ Number of hours worked by all employees]
If your latest incident rates and D.A.R.T. rates are greater than 100% of the industry average for all your NAICS code Numbers Listed, your bid may be disqualified.

The industry average can be found at www.bls.gov
WORKERS’ COMPENSATION INFORMATION

1. Provide your Workers’ Compensation Experience Modification Rate (EMR) Data:

Policy Year EMR
* If your current EMR is greater than 1.25, initialing here certifies that you will provide a competent, full- time person or representative responsible for safety for all City projects:____________
Current EMR*
* lnitialing here certifies that your firm does not have an EMR:___________ (Submit a copy of your firm's Loss Run Reports for the last three years if your firm does not have an EMR.)
1 Year Ago:
2 Years Ago: Name of your firm’s Workers’ Compensation carrier:
3 Years Ago: Phone Number of Workers’ Compensation carrier

2. Is your firm self-insured for Workers' Compensation claims? Yes  No  (If yes, please attach a copy of the latest Annual Report to the State of California Department of Industrial Relations and/or State of California Certificate of Self-Insurance.) SECTION 3– CITATION HISTORY

1. Has your firm received any regulatory citations in the last threeyears? Yes  No  If yes, please answer the question below.

Redlands Regular Meeting of 03-04-2025 1088 of 1100
14 2. Were any of the confirmed (Closed) citations classified as Serious, Willful, Repeat, or Failure to abate?
Yes  No 

3. If yes, please explain:

4. Have you abated all of the citations issued to you in the last threeyears Yes  No  If no, please explain abatement action plan:

SECTION 4 – SAFETY POLICIES
Questions (Please check YES or NO) YES NO*

1. Does your company provide and adhere to a written Illness Prevention Program (IIPP) (CCR Title 8 §3203(a))? If yes, a copy of the program will be required on-hand at the job site throughout the duration of the contract. Please attach a copy to your bid proposal.  

2. Does your company provide and conduct Tailgate Meetings, or equivalent with employees at least every 10 working days. (CCR Title 8 §1509(e))
 

3. Does your company have a policy for disciplinary action for unsafe behavior ensuring employee compliance with safe and healthy work practices? (CCR Title 8 §3203(a)(2))  

4. Does your company provide and abide by a written Code of Safe Practices that relates to your firm’s operations. (CCR Title 8 §1509(b)) If yes, a copy of the Code of Safe Practices will be required on-hand at the job site throughout the duration of the contract. Please attach a copy with your bid proposal.  

5. Does your company perform JHAs? (CCR Title 8 §1511(b)  

6. Does your company provide training and retraining programs for ensuring employee compliance with safe and healthy work practices? (CCR Title 8 §3203 (a)(2), (a)(7)  

7. Does your company provide training and retraining programs for ensuring employee compliance   *Please provide reason(s) for NO answer in the box below or on a separate sheet of paper.

Failure to provide the above-referenced documents will result in the contractor’s bid being disqualified.

SECTION 5 – SAFETY PROGRAMS AND PROCEDURES

PLEASE ANSWER ALL QUESTIONS BY CHECKING YES OR NO, AND ATTACHING APPROPRIATE DOCUMENTS THAT MAY APPLY OR AS REQUESTED.

Redlands Regular Meeting of 03-04-2025 1089 of 1100
15 YES NO

1. Is Confined Space work anticipated in the scope of the work awarded? (If no, please proceed to Question 2)  
If yes, please attach the following: Attached?
Copy of written Confined Space Entry Procedure  
List of personnel authorized on jobsite to work in confined space(s)   List of personnel authorized on jobsite to serve as Rescue Team   Verification of personnel training (copies of certs, cards, etc.)  

2. Is work requiring Lockout/Tagout protocols anticipated in the scope of the work awarded? (If no, please proceed to Question 3)  
If yes, please attach the following: Attached?
Copy of written Lockout/Tagout (LOTO) Procedure  
List of personnel authorized on jobsite to perform LOTO   Verification of personnel training (copies of certs, cards, etc.)  

3. Is work requiring a personal lift anticipated in the scope of the work awarded? (If no, please proceed to Question 4)  
If yes, please attach the following: Attached?
List of personnel authorized on jobsite to use lifts   Verification of personnel training (copies of certs, cards, etc.)  

4. Is work requiring a forklift anticipated in the scope of the work awarded? (If no, please proceed to Question 5)  
If yes, please attach the following: Attached?
List of personnel authorized on jobsite to use a forklift   Verification of personnel training (copies of certs, cards, etc.)  

5. Is work requiring a crane anticipated in the scope of the work awarded? (If no, please proceed to Question 6)  
If yes, please attach the following: Attached?
Copy of written Crane Program  
Copy of all expected Crane operators’ Certifications   List of personnel designated as Competent under Crane program   Verification of personnel training (copies of certs, cards, etc.)   NOTE: If awarded bid, more documentation may be required Redlands Regular Meeting of 03-04-2025 1090 of 1100
16 6. Is Hot Work (as defined by OSHA) anticipated in the scope of the work awarded? (If no, please proceed to Question 7)  
If yes, please attach the following: Attached?
Copy of written Hot Work Procedure  
List of personnel authorized on jobsite to perform Hot Work   Verification of personnel training (copies of certs, cards, etc.)  

7. Is Trenching/ Excavation work anticipated in the scope of the work awarded? (If no, proceed to Question 8)  
Is a plan in place for the disposal of all material that cannot be returned to the trench/ excavation?   Are appropriate materials for barricading or securing work area at jobsite?   Has a permit from the Department of Industrial Relations for excavations deeper than 5 feet been obtained?  
If yes, please attach the following: Attached?
Copy of written Trenching/ Excavation Procedure  
Copy of Permit if trench is to exceed depth of 5 feet   List of personnel designated as Competent under Trenching/ Excavation Program   Verification of personnel training (copies of certs, cards, etc.)   NOTE: If awarded bid, more documentation may be required

8. Is electrical work anticipated in the scope of the work awarded? (If no, proceed to Question 9)   If yes, please attach the following: Attached?
Copy of written Electrical Safety Program  
List of personnel designated as Competent under Electrical Safety Program   Verification of personnel training (copies of certs, cards, etc.)  

9. Is work that may have an arc flash potential anticipated in the scope of the work awarded? (If no, proceed to Question 10)  
Are all materials required to safely perform arc flash present?   If yes, please attach the following: Attached?
Copy of Arc Flash Procedure  
List of personnel designated as Competent under Arc Flash Program   Verification of personnel training (copies of certs, cards, etc.)   Redlands Regular Meeting of 03-04-2025 1091 of 1100
17 10. Is work involving chemicals anticipated in the scope of the work awarded? (If no, proceed to Question 11)?  
If yes, please attach the following: Attached?
Copy of written Hearing Conservation Program  
List of personnel working in high noise areas  
Verification of personnel training (copies of certs, cards, etc.)  

11. Is work involving chemicals anticipated in the scope of the work awarded? (If no, proceed to Question 12)?  
* Copies of SDS for Chemicals used must be kept at jobsite Please attach the following: Attached?
Copy of written Hazard Communication Program  
List of personnel performing work with chemicals  
Verification of personnel training (copies of certs, cards, etc.)   List trade names of all hazardous materials which you will be using on site:

12. Is work on or adjacent to public roadways anticipated in the scope of the work awarded. (If no, proceed to Question 13)

 
Do you have the appropriate provisions (signs, devices, barricades/)   Please attach the following: Attached?
Please provide a list of personnel working in traffic areas.   Verification of personnel training (copies of certs, cards, etc.)   NOTE: If awarded bid, more documentation may be required

13. Is it anticipated in the scope of the work awarded that exposure to asbestos is possible? (If no, proceed to Question 14)  
Please attach the following: Attached?
Copy of written procedure(s)  
List of personnel working with potential exposure to asbestos   Verification of personnel training (copies of certs, cards, etc.)   Redlands Regular Meeting of 03-04-2025 1092 of 1100
18 14. Is it anticipated in the scope of the work awardedthat exposure to silica is possible? (i.e. sandblasting, concrete demolition, concrete saw cutting, surface grinding, etc.) (If no, proceed to Question 15)
 
Please attach the following: Attached?
Copy of Silica Control Plan  
List of personnel working with potential exposure to silica   Verification of personnel training (copies of certs, cards, etc.)  

15. Is work at heights anticipated in the scope of the work awarded? (If no, proceed to Question 16)   Please attach the following: Attached?
Copy of written Fall Protection Program  
List of personnel designated as Competent under Fall Protection Program   Verification of personnel training (copies of certs, cards, etc.)  

16. Is work requiring the use of respirators anticipated in the scope of the work awarded? (If no, proceed to Question 17)  
Please attach the following: Attached?
Copy of written Respiratory Protection Program  
List of personnel using respirators  
Verification of personnel training (copies of certs, cards, etc.)  

17. If the scope of work to be performed is not adequately represented by questions (1-16), please list any additional Health & Safety concerns below.

SECTION 6 – COMPLIANCE HISTORY ON CITY PROJECTS
In addition to the previous sections, Contractors that have previously been awarded work by the City, will be equally evaluated on their compliance history in relation to City projects.

Redlands Regular Meeting of 03-04-2025 1093 of 1100
19 SECTION 7 – CERTIFICATION STATEMENT
I Certify under penalty of perjury that:
a. the information contained herein is true and correct to the best of my knowledge,and b. no attempt has been made to give false or misleading information or to withhold any information.

Signature of Authorized Representative: Title of Authorized Representative Printed Name of Authorized Representative Date Signed:

Redlands Regular Meeting of 03-04-2025 1094 of 1100
20 NOTICE OF NON-COMPLIANCE
Project:

Contractor:

Notice of Non-Compliance was issued to Contractor’s representative, , Name on at .

The following unsafe behaviors were observed at the Contractor’s job site:

If the unsafe condition is not immediately corrected, the City of Redlands may take disciplinary action in accordance with the Contractor Safety Program guidelines. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ To be completed by Contractor
Corrective action plan to abate hazards:

Unsafe Condition Resolved: Date: Time:

Remarks:

Attachment C
Redlands Regular Meeting of 03-04-2025 1095 of 1100
21 Job Hazard Analysis
Signatures of Employees On-Site this JHA is applicable to:

Project:

Company: Project Safety Official: Project Manager (City):

Scope of Work: Location: Date:

Tasks Potential Safety
Risks/Hazards
Safety
Controls/Mitigat
Required PPE
Hard Hat
Safety Vest
Safety Glasses/Goggles
Safety Boots
Respirator
Safety Gloves
Face Shield
Fall Protection
Other:

Employee Signature: Print Name: Date:

Attachment D
Redlands Regular Meeting of 03-04-2025 1096 of 1100
22 INCIDENT INVESTIGATION FORM
Date of Incident: Time of Incident: Date Reported:

Lead Investigator: Contact Information:

Contractor: Employee Name:

Witness 1 Name: Telephone:

Witness 2 Name: Telephone:

Incident Site/ Location
Incident Summary:

Near Miss Yes No Incident Severity: Minor Significant Major Critical Root Cause(s):

Corrective Actions:

Attachment E
Redlands Regular Meeting of 03-04-2025 1097 of 1100

APPENDIX F

LIST OF EXISTING TEMPORARY PATCHES TO BE

PROVIDED AT THE PRE-CONSTRUCTION MEETING

AND SUBSEQUENT WEEKLY MEETING
Redlands Regular Meeting of 03-04-2025 1098 of 1100

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 03-04-2025 1099 of 1100
Redlands Regular Meeting of 03-04-2025 1100 of 1100

← All documents from this meeting